Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout168-0321a. Well Status:Oil SPLUG Other Abandoned Suspended
1b. Well Class:
20AAC 25.105 20AAC 25.110 Development Exploratory
GINJ WINJ WDSPL No. of Completions: _0 Service Stratigraphic Test
2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry:
Aband.:
3. Address: 7. Date Spudded: 15. API Number:
4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number:
Surface:
Top of Productive Interval: 9. Ref Elevations: KB: 17. Field / Pool(s):
GL: N/A BF: N/A
Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation:
4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number:
Surface: x- y- Zone- 4
TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD:
Total Depth: x- y- Zone- 4
5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD:
Submit electronic information per 20 AAC 25.050 92' (ft MSL)
22.Logs Obtained:
N/A
23.
BOTTOM
20"604
13-3/8" J-55 1,977
9-5/8" S-95 &
N-80
9,357
7" S-95 10,168
24. Open to production or injection? Yes No 25.
26.
Was hydraulic fracturing used during completion? Yes No
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27.
Date First Production: Method of Operation (Flowing, gas lift, etc.):
Hours Tested: Production for Gas-MCF:
Test Period
Casing Press: Calculated Gas-MCF: Oil Gravity - API (corr):
Press. 24-Hour Rate
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date perf'd or liner run):
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
CASING, LINER AND CEMENTING RECORD
List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion,
TUBING RECORD
10,120 / 9,798
9,310
10,106
2-7/8"
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Hilcorp Alaska, LLC
WAG
Gas
6/8/2023 168-032 / 322-602
50-733-20104-00-00
S MGS Unit 11
ADL0018746
696' FSL, 1876' FWL, Sec 35, T8N, R13W, SM, AK
N/A
4/17/1968
10,508 / 10,174
(LS) Surface (SS) 2' / 2'
100'
3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503
229322.8215 2463868.3185
N/A
2585' FSL, 2459' FWL, Sec 35, T8N, R13W, SM, AK
CASING WT. PER
FT.GRADE
7/10/1968
CEMENTING RECORD
N/A
N/A
SETTING DEPTH TVD
2465742.9158
TOP HOLE SIZE AMOUNT
PULLED
N/A
229947.0323
TOP
SETTING DEPTH MD
suspension, or abandonment; or within 90 days of acquisition of the log, whichever occurs first. Types of logs to be listed include, but are not limited to: mud
log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing
collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page only if necessary.
N/A
BOTTOM
SIZE DEPTH SET (MD)
9,320 / 9,003
PACKER SET (MD/TVD)
3-1/2"
Surf
23
Surf
9,429
2,001Surf
Surf
43.5 & 40
10,502
Surf
9,111
85 & 95
54.5
605
Surf 9,676
N/A
N/A
Gas-Oil Ratio:Choke Size:
Per 20 AAC 25.283 (i)(2) attach electronic information
Sr Res EngSr Pet GeoSr Pet Eng
Middle Ground Shoal / MGS Oil
N/A
Oil-Bbl: Water-Bbl:
Water-Bbl:
PRODUCTION TEST
N/A
Date of Test: Oil-Bbl:
Flow Tubing
Form 10-407 Revised 10/2022 Due within 30 days of Completion, Suspension, or Abandonment
By Grace Christianson at 11:38 am, Jun 29, 2023
Abandoned
6/8/2023
JSB
RBDMS JSB 062923
xGBJM 8/10/23
DSR-7/19/23
Conventional Core(s): Yes No Sidewall Cores:
30.
MD TVD
N/A N/A
N/A N/A
Top of Productive Interval N/A N/A
N/A N/A
31. List of Attachments:
Wellbore schematic, Well operations summary
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name: Aras Worthington
Digital Signature with Date:Contact Email:Aras.Worthington@hilcorp.com
Contact Phone: 907 564-4763
Operations Manager
General:
Item 1a:
Item 1b:
Item 4b:
Item 9:
Item 15:
Item 19:
Item 20:
Item 22:
Item 23:
Item 24:
Item 27:
Item 28:
Item 30:
Item 31:
Yes No
Well tested? Yes No
28. CORE DATA
If Yes, list intervals and formations tested, briefly summarizing test results for
each. Attach separate pages if needed and submit detailed test info including
reports and Excel or ASCII tables per 20 AAC 25.071.
NAME
Permafrost - Top
Permafrost - Base
29. GEOLOGIC MARKERS and POOL BOUNDARIES: (list all encountered) FORMATION TESTS
INSTRUCTIONS
Formation Name at TD:
If Yes, list formations and intervals cored (MD/TVD, From/To), and briefly summarize lithology and presence of oil, gas or water (submit separate pages if
needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071 no matter when acquired.
Authorized Title:
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, as-built, core
analysis, paleontological report, production or well test results, per 20 AAC 25.070.
Authorized Name and
Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion,
suspension, or abandonment; or 90 days after log acquisition, whichever occurs first.
Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345),
and/or Easement (ADL 123456) number.
The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a current well schematic
diagram with each 10-407. Submit 10-407 and attachments in PDF format to aogcc.permitting@alaska.gov. All laboratory analytical reports from
a well must be submitted to the AOGCC, no matter when the analyses are conducted per 20 AAC 25.071.
Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
TPI (Top of Producing Interval).
Form 10-407 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Digitally signed by Dan
Marlowe (1267)
DN: cn=Dan Marlowe (1267)
Date: 2023.06.29 11:24:47 -
08'00'
Dan Marlowe
(1267)
Updated by JLL 06/22/23
Dillon Platform
Di-11
Dillon Platform
Well DI-11
Last Completed 1/18/81
Oil Well>Injector
Dual String Jewelry Detail
# Depth (RKB) Length ID OD Item
Long String
1 33’ 1.0’ Cameron Type DC-B Tubing Hanger
2 9,272’ 3-1/2” Butt Tubing
3 9,273’ 1.12’ 2.750” Baker F Seating nipple
4 9,306’ 1.20’ 3-1/2” x 2-7/8” Butt crossover
5 9,312’ 1.50’ 8.125” Baker Parallel Flowhead
6 9,320’ 2.10’ 6.00” Baker Model F-1 Packer w/6” Bore
7 9,320’ 4.875” 6.00” Baker seal assembly
8 9,320’ Seal locator, sub, 6” Baker
9 10,105’ 1.05’ 2.25 Baker Model F seating nipple
10 10,106’ 1.17’ XO 2 7/8” EUE to 2 7/8” pin w/collar
11 10,107’ 0.94’ 3.00 Baker G-22 Locator (turned down to 4” OD
12 10,120’ 1.87’ 4.00” Baker Model 7”, F-1 Packer
13 10,127’ 20.45’ 3.00” 4.00” Seal assembly
14 10,128’ 0.8’ Bull nose shear out sub
Short String
A 33’ 1.0’ Cameron Type DC-B Tubing Hanger
B 9,308’ 1.13’ 3-1/2” x 2-7/8” Butt crossover
C 9,271’ 1.15’ 2.197” Baker F-seating nipple
Fish Details:
# Date Comments
Fish 1 06/02/82 Eline Fish in long string @9938’: spent gun and 9700’ of 7/32” EL.
Fish 2 05/01/02
Pollard left tool string stuck @2442’SLM in LS, Go Devil and two cutter
bars on top. Wire cut and recovered 1250’ of wire, 1192’ of .125 wire
and BHA, top of wire left in hole unknown.
Fish 3 10/09/2022
SL toolstring and D&D Holefinder stuck in SS @ 9200’ SLM (suspect
split tubing @ bottom)
Casing and Tubing Detail
Size Type Wt/ Grade Top Btm CONN / ID Cement / Other
20” Conductor 85 & 95# Surface 605 Vetco 1250 sx, Cmt at surface
13-3/8”
Surface
54.5#, J-55 Surface
2,001’
19.3°
ST&C /
12.615”
1600 sx (328bbls), CBL
TOC = 940’, (940’ to surface
has 50% bond)
9-5/8” Intermediate
43.5#,
S95,40#, N80 Surface 9,676 8RD / 8.755”,
Butt / 8.835”
1150 sxs, Calc TOC = 7712’
(20% washout)
7” Liner 23#, S-95 9,429’
10,502
’8RD / 6.366”180 sxs, Calc TOC = 9812’
(20% washout)
Tubing
3-1/2” Production 9.2#, N-80
33’ 9,306’Butt / 2.992”Long String
33’ 9,308’ Short String
2-7/8” Production 6.4#, N-80
9,306’ 10,106’Butt / 2.441”Long String
9,308’ 9,310’ Short String
TD =10,508’ PBTD = 10,448’
MAX HOLE ANGLE = 23.8O @ 3,700’MD
1
13-3/8”
@ 2,001’
Perfs
10,140’- 10,310’
Perfs
9920’-10,110’
RT-THF: 33’ KB
7” @ 10,502’
9-5/8” @
9,676’
Sqzd 9-5/8”
csg hole @
2330’
G&G OIL TOP
9,625’ MD
TOC
Tagged @
30’ CBL =
940’
(above
940’ ~50%
bond)
A
3
4
5
TOL
9,429’
8
2
B
C
Pkr @
10,120’
7
Pkr @
9,320’
9
Calc TOC
9812’
Calc TOC:
7712’
1110
13
14
20”
@ 605’
ADL: 18746 PTD: 168-032
Leg 2, Slot 2 API: 50-733-20104-00
Notes:
x 1974 & 1981 – Squeeze casing holes at 2330’, tested after resqueezed to 1500 psi, bled to 500 psi in 15 min.
x Failed MIT in 1986. Casing would not hold pressure over 1250 psi.
x LS: no runs since tool stuck in 2002.
A1
Cement Plug #3:
OOA: Cemented to surface, squeezed
from 530’ MD
OA: 530’ MD to surface
IA: 530’ MD to surface
LS: 500’ MD to surface
SS: 530’ MD to 2’ MD
Cement plug #1:
IA: 9074’ to ~7000’ MD (Est’d)
SS: 9074’ to 6718’ MD (Tag 10/23/22)
LS: 9074’ to ~7000’ MD (Est’d)
33333333333333333333333333333333
22222222222222222222
Cement plug #2:
IA: 3000’ to 895’ (Est.) MD
SS: 3000’ to 1,048’ MD (Tag 5/27/23)
LS: 3000’ to 594’ MD (Tag 6/1/23)
Rig Start Date End Date
SL / Cmt
Pump 10/21/22 6/21/23
Daily Operations:
Hilcorp Alaska, LLC
Well Operations Summary
API Number Well Permit NumberWell Name
S MGS Unit 11 50-733-20104-00-00 168-032
11/04/22 - Friday
10/21/22 - Friday
10/22/22 - Saturday
PJSM, R/U circulating lines, check circ. paths SS t/LS, SS t/IA good. Mix & pump 50 bbls Mud flush down SS up IA. Pump
443bbls 9.8 brine down SS out IA. R/U, inject displacement fluids Down Di-17
PTSM, Cont. inject displacement from Di09 cmt job. While pumping had a leak on fluid end of pump, troubleshoot &
repair same & test good. Build 65 bbls 9.8 Brine for cmt job. R/U pump lines, build mix water. PJSM. HCU pump 5 bbls
water, P/T lines t/5000 good, open & pump 79 bbls 14ppg class G cmt down SS taking returns up LS, hold 200-400psi,
backpressure. Continue pumping down SS taking returns up IA, (144bbls total ) launch wiper ball & chase w/43bbls 9.8
brine taking returns up IA, then swap taking returns up LS while pumping remaining 18bbls 9.8 brine. Shut down monitor
& shut in well. Had full displacement from pumping job.
10/23/22 - Sunday
R/U W/L with 2 1/4" bailer. PT lubricator t/2500psi good, RIH tag cmt at 6718'. Tag witnessed by AOGCC inspector Brian
Bixby. POOH R/d W/L for leg move. Secure well. No Recovery
CMIT LSxSS with state inspector Guy Cook witnessing
Pre Test 8psi
Initial 2753psi
15mins 2724psi
30mins 2701psi
11/06/22 - Sunday
R/u E/L, M/u 1.69" weight bar, 2.16" CCL and 2" 60deg perf gun. RIH tagged @ 1,140'elm. POOH L/d Gun and CCL,
reconfigured tool string. RIH w/1.69" x2 wt bars, 1.69" CCL. RIH w/tagged 1140' W/t and stuck at 1143'elm. Cont
working and pulled wire out of the rope socket. POOH with wire and confirmed pulling out of the head.
Lost tool detail, Rope socket (1" fish neck), weight bars x2, CCL (max OD 1.69", AOL 12.6'). Found EL R/u on LS, R/d and
moved to SS, Re-head and R/u EL on SS, RIH w/1.69" 2" 60deg phase perf gun and perforated SS, LS and 9-5/8" @ 3000-
06'. POOH confirmed all shots fired, R/d EL. Released EL crew. R/u Circ eq. Verified circulation down SS up IA @
3bpm/500psi, Verified circulation down SS up LS @ 3bpm/600psi. R/d circulation eq.
RIH tag cmt at 6718'.
pump 79 bbls 14ppg class G cmt down SS taking returns up LS
Continue pumping down SS taking returns up IA, (144bbls total ) launch wiper ball & chase w/43bbls 9.8
brine taking returns up IA, then swap taking returns up LS while pumping remaining 18bbls 9.8 brine
Verified circulation down SS up IA @
3bpm/500psi, Verified circulation down SS up LS @ 3bpm/600psi.
Tag witnessed by AOGCC inspector Brian
Bixby.
moved to SS, perforated SS, LS and 9-5/8" @ 3000-
06'
Cement job pumped according to plan in sundry. -bjm
RIH w/tagged 1140' W/t and stuck at 1143'elm
CMIT LSxSS with state inspector Guy Cook witnessing
Rig Start Date End Date
SL / Cmt
Pump 10/21/22 6/21/23
Daily Operations:
Hilcorp Alaska, LLC
Well Operations Summary
API Number Well Permit NumberWell Name
S MGS Unit 11 50-733-20104-00-00 168-032
05/19/2023 - Friday
Finish up DI-16. Rig up cement package, make up KCL water, spot cuttings bin to receive cement returns, mix gel,
prepare to cement in am.
05/27/2023 - Saturday
05/20/2023 - Saturday
Safety Meeting- Cementing and Injecting fluid downhole. Mix Spacer, line cuttings tank get ready for cement returns.
Safety Meeting- Cementing operations. Test lines to 2200, found leak on SS crown valve, remove valve install blank,
retest to 2200, good test. Start displacing down SS, up LS with 9.8 brine, Pump 20 bbl. got returns @ 18 bbl. Swap to
pump down LS up SS pumped 21 bbl. pressure climbed to 1700. Stop pumping discuss job with Aras. Swap to Pump
down SS up LS Pump 12 bbl. got returns @ 8 bbl. 500 psi on pump truck. Pump down SS out IA, to ensure we can still
pump without high pressure. Well took 18 bbl to fill from SS to LS to displace freeze protect. Start pumping 10 bbl. 9.8#
spacer down SS in IA, follow with 130 bbl 14 ppg Class A +4% FCG+.3%FFL, close IA, switch from IA to pump out LS. Pump
57 bbl, drop wiper ball displace with 9 bbl. of 9.8 brine, with 480 psi on cement pump. Total cement pumped 187 bbl. Est
cement top in IA 895', Est top of LS 1390', Total cement loss while pumping out LS- 47 bbl. behind LS. Well took 7.5 bbls
of spacer to get returns back. Close all wellhead valve, open block valves to wash cement from lines.
05/21/2023 - Sunday
Safety Meeting- Injecting well fluids, working with crane. Rig down cement lines, move to North Corner, rig up to Inject
well fluid from DI-11 into DI-17. Safety Meeting -Injecting into well, Inject 201 bbl. well fliud from DI-11 into DI-17, 2200
on IA, 2200 on LS 1.4 bpm.
R/U E-line on LS. P/U tool string= FN, weight bar, swivel, CCL, 2" sample bailer = 12' CCL to end of tool string=4', RIH tag
@ 594' CCL = 598'. Pick up & re-tag same, POOH, recovered small amount of cmt from bailer. R/D e-line.
06/01/2023 - Thursday
Run in the SS with E line, tag bottom @ 1048', attempt to get cement sample, POOH no sample came back, to Pressure
test, Rig up to test LS/SS @ 1625 starting psi 2761 @ 1640- 2546 psi = 215 psi loss, @ 1640 to 1655 pressure went from
2546 psi to 2428 psi =118 loss, wait on further instruction.
Move back to DI-16 to set charges.
05/28/2023 - Sunday
Rig up to test LS/SS/IA, double check all connections, valves, start 2773 psi @ 15 min 2400 psi loss of 373 psi, stop test,
wait for further instructions move on to test DI-4.
R/U E-line on LS
Run in the SS with E line, tag bottom @ 1048
47 bbls cement lost, likely through holes in 9-5/8" casing at 3000' MD. -bjm
follow with 130 bbl 14 ppg Class A +4% FCG+.3%FFL, close IA, switch from IA to pump out LS Pump
57 bbl, drop wiper ball displace with 9 bbl Total cement pumped 187 bbl
Start pumping
RIH tag
@ 594' CCL = 598'. Pick up & re-tag same, POOH, recovered small amount of cmt from bailer
down SS in IA,
Total cement loss while pumping out LS- 47 bbl
Rig Start Date End Date
SL / Cmt
Pump 10/21/22 6/21/23
Daily Operations:
Hilcorp Alaska, LLC
Well Operations Summary
API Number Well Permit NumberWell Name
S MGS Unit 11 50-733-20104-00-00 168-032
06/02/2023- Friday
P&A work on Di-09. R/U E-line on Di-11 on NE leg. Perf. LS tbg, run 3ft perf gun with 6 shots/ft between collars @
515'md and 482'md, per's from 500'-503', good indication of firing. Zeroed tool at grating walk around in well room as
before. R/D e-line. R/U to circulate down the LS tbg x SS tbg @.5bpm pressured up no returns, 250psi, IA=0psi,
OA=225psi, OOA=0psi, (communication verified to OA). Pump down SS tbg x LS tbg @ .5bpm- pressured up no returns
600psi, IA=0psi, OA=0psi, OOA=0psi. No communication thru SS tbg. R/U E-line, run 2.88" drift thru SS tbg to 600'md
with bobble @ perf area and slight over pull coming up thru perf. Decision made to perf SS tbg a jt lower to establish
communication between SS tbg x LS tbg x IA. Perf. SS tbg-run 2ft gun with 6 shots/ft between collars @ 550'md and
518'md, per's from 530'-532', good indication of firing. Zeroed tool at grating walk around in well room as before. R/D e-
line. R/U to circulate down the SS tbg x LS tbg, pump @2bpm/200psi, IA=60psi, OA=0psi, OOA=0psi, (communication
verified to IA). Pump down SS tbg and shut in LS tbg, pump @ .5bpm- pressured up 500psi, IA=440psi, OA=400psi,
OOA=0psi, (communication verified to IA and OA). Bleed down and shut in well for the night. Rest crew.
06/08/2023 - Thursday
Strapped tanks prior to starting- Frac tank= 210 BBLS, Diffuser= 0 BBLS. Lined up and pumped 45 BBLS of 14 PPG cement
down SS and up OA @ 2 BPM, 220 PSI. At 25 BBLS away slowed rate down to 1.5 BPM, 350-450 PSI. Good returns
observed at 45 BBLS pumped 1.5 BPM, 330 PSI. Shut down and close in OA. Lined up to pump down SS and up IA.
Pumped 31 BBLS of 14 PPG cement at 2 BPM, 200 PSI observing good cement at surface. Shut down and close IA. Line up
to LS and pump 6 BBLS of 14 PPG down SS and up LS observing good cement at surface 2 BPM, 210 PSI. Shut in LS.
Squeezed 2.2 BBLS in OOA at .5 BPM shutting down at 520 PSI. Pressure bled to 420 in 5 min. Pumped .3 BBLS to 500 PSI
squeezing a total of 2.5 BBLS. Pumped a total of 84.5 BBLS of cement for the job. Total fluid back from cement job was
82 BBLS of that 6 BBLS was cement. Squeezed a total of 2.5 BBLS in OOA.
Frac tank=270 BBLS, Diffuser tank= 22 BBLS. Performed sheen test on CMT- good test. Overboard wash water and
cement during clean up. R/u circ eq. on Di-17. PT lines to 2500psi, Injected 256bbls Diesel/FIW/Brine returns from Di-11
@ 2.3bpm/2500psi. SD pump blow lines dry and R/d eq.
06/06/2023 - Tuesday
Rig up on Di-11. Hold PJSM. Fill lines and PT to 1100 PSI. Line up and attempt to circulate through OOA pressuring up to
500 PSI and holding for 3 min bleeding down to 400 PSI. Bled off and pumped 2x's BU in OA, IA and LS through SS at 2.5
BPM, 200 PSI. Spot FIW/Surfactant in OA, IA and LS. Observed cement in the bottom of the diffuser tank ranging from 16-
24 inches deep. R/U vac and cleaned out bottom of diffuser tank filling up 4 cutting totes with cement. Put sugar in each
totes. Rest Crew
Squeezed 2.2 BBLS in OOA at .5 BPM shutting down at 520 PSI
Perf. SS tbg-run 2ft gun with 6 shots/ft between collars @ 550'md and
518'md, per's from 530'-532
up to pump down SS and up IA.
R/U E-line on Di-11
No communication thru SS tbg.
Pump down SS tbg and shut in LS tbg, pump @ .5bpm- pressured up 500psi, IA=440psi, OA=400psi,
OOA=0psi, (communication verified to IA and OA).
Good returns
observed at 45 BBLS pumped 1.5 BPM, 330 PSI. Shut down and close in OA
Perf. LS tbg,
Line up
to LS and pump 6 BBLS of 14 PPG down SS and up LS observing good cement at surface
Bled off and pumped 2x's BU in OA, IA and LS through SS at 2.5
BPM, 200 PSI
Total fluid back from cement job was
82 BBLS of that 6 BBLS was cement. Squeezed a total of 2.5 BBLS in OOA
Pumped 31 BBLS of 14 PPG cement at 2 BPM, 200 PSI observing good cement at surface.
per's from 500'-503
Pumped .3 BBLS to 500 PSI
squeezing a total of 2.5 BBLS. Pumped a total of 84.5 BBLS of cement for the job
L
R/U to circulate down the SS tbg x LS tbg, pump @2bpm/200psi, IA=60psi, OA=0psi, OOA=0psi, (communication
verified to IA).
Lined up and pumped 45 BBLS of 14 PPG cement
down SS and up OA
Rig Start Date End Date
SL / Cmt
Pump 10/21/22 6/21/23
Daily Operations:
Hilcorp Alaska, LLC
Well Operations Summary
API Number Well Permit NumberWell Name
S MGS Unit 11 50-733-20104-00-00 168-032
06/21/2023 - Wednesday
Verified TOC; OOA-visual cement at surface, OA-visual cement at surface, IA-visual cement at surface, SS-tag cement 2'
down, LS-visual cement at surface.
Verified TOC; OOA-visual cement at surface, OA-visual cement at surface, IA-visual cement at surface, SS-tag cement 2'
down, LS-visual cement at surface
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE:
P.I. Supervisor
SUBJECT:
FROM:
Petroleum Inspector
Section:35 Township:8N Range:13W Meridian:Seward
Drilling Rig:N/A Rig Elevation:N/A Total Depth:10508 ft MD Lease No.:ADL 0018746
Operator Rep:Suspend:P&A:X
Conductor:20"O.D. Shoe@ 605 Feet Csg Cut@ Feet
Surface:13 3/8"O.D. Shoe@ 2001 Feet Csg Cut@ Feet
Intermediate:O.D. Shoe@ Feet Csg Cut@ Feet
Production:9 5/8"O.D. Shoe@ 9676 Feet Csg Cut@ Feet
Liner:7"O.D. Shoe@ 10502 Feet Csg Cut@ Feet
SS Tubing:3 1/2" x 2 7/8"O.D. Tail@ 9310 Feet Tbg Cut@ Feet
LS Tubing:3 1/2" x 2 7/8"O.D. Tail@ 10106 Feet Tbg Cut@ Feet
Type Plug Founded on Depth (Btm)Depth (Top)MW Above Verified
LS Tubing Fullbore Bottom 10508 ft
SS Tubing Fullbore Bottom 10508 ft 1048 ft Wireline tag
Initial 15 min 30 min 45 min Result
Tubing 2761 2546 2428
IA 0 0 0
OA 0 0 0
Remarks:
Attachments:
Walter Waite
Casing/Tubing Data (depths are MD):
Plugging Data (depths are MD):
Could not get down to tag top of cement in LS because of stringers (cement dribbles) in tubing. No cement sample in bailer of
SS. Cement was to hard to capture.
May 27, 2023
Sully Sullivan
Well Bore Plug & Abandonment
S MSG Unit Dillon 11
Hilcorp Alaska LLC
PTD 1680320; Sundry 322-602
Photo of MIT setup
Test Data:
F
Casing Removal:
rev. 11-28-18 2023-0527_Plug_Verification_SMSG_Di-11_ss
Plug Verification - SMGS Dillon 11 (PTD 1680320)
5/27/2023
MIT Setup
Kyle Wiseman Hilcorp Alaska, LLC
Geotechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 777-8337
E-mail: Kyle.Wiseman@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 11/21/2022
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20221121
Well API #PTD #Log Date Log
Company Log Type AOGCC
Eset#
CLU 05RD2 50133204740200 222092 10/18/2022 AK E-Line Perf_GPT
MGS S MGS
Unit 11 50733201040000 168032 10/11/2022 AK E-Line LDL
SRU 241-33 50133206630000 217047 8/29/2022 AK E-Line TTBP_Perf
SRU 32A-33 50133101640100 191014 9/23/2022 AK E-Line GPT
SCU 344-33 50133202930100 218054 9/11/2022 AK E-Line Punch
BCU 18RD 50133205840100 222033 9/10/2022 AK E-Line GPT
BCU 18RD 50133205840100 222033 9/18/2022 AK E-Line Stim
BRU 233-23 50283201360100 222050 11/1/2022 AK E-Line Perf
BRU 233-23 50283201360100 222050 9/12/2022 AK E-Line CIBP
Please include current contact information if different from above.
T37280
T37281
T37282
T37283
T37284
T37285
T37285
T37286
T37286
By Meredith Guhl at 2:54 pm, Nov 21, 2022
MGS S MGS 50733201040000 168032 10/11/2022 AK E-Line LDLUnit 11
Meredith Guhl Digitally signed by Meredith Guhl
Date: 2022.11.21 14:55:38 -09'00'
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE:
P.I. Supervisor
SUBJECT:
FROM:
Petroleum Inspector
Section:35 Township:8N Range:13W Meridian:Seward
Drilling Rig:N/A Rig Elevation:N/A Total Depth:10508 ft MD Lease No.:ADL 0018746
Operator Rep:Suspend:P&A:X
Conductor:20"O.D. Shoe@ 605 Feet Csg Cut@ Feet
Surface:13 3/8"O.D. Shoe@ 2001 Feet Csg Cut@ Feet
Intermediate:O.D. Shoe@ Feet Csg Cut@ Feet
Production:9 5/8"O.D. Shoe@ 9676 Feet Csg Cut@ Feet
Liner:7"O.D. Shoe@ 10502 Feet Csg Cut@ Feet
SS Tubing:3 1/2" x 2 7/8"O.D. Tail@ 9310 Feet Tbg Cut@ Feet
LS Tubing:3 1/2" x 2 7/8"O.D. Tail@ 10106 Feet Tbg Cut@ Feet
Type Plug Founded on Depth (Btm)Depth (Top)MW Above Verified
Initial 15 min 30 min 45 min Result
Tubing 2753 2724 2711
IA 0 0 0
OA 5 5 5
OOA 0 0 0
Initial 15 min 30 min 45 min Result
Tubing
IA
OA
Remarks:
Attachments:
MIT-T only. The tag was witnessed on an earlier date by AOGCC Petroleum Inspector Brian Bixby.
November 4, 2022
Guy Cook
Well Bore Plug & Abandonment
S MSG Unit Dillon 11
Hilcorp Alaska LLC
PTD 1680320; Sundry 322-602
none
Test Data:
P
Casing Removal:
Wade Hudgens
Casing/Tubing Data (depths are MD):
Plugging Data (depths are MD):
rev. 11-28-18 2022-1104_Plug_Verification_SMSG_Di-11_gc
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
From:Aras Worthington
To:McLellan, Bryan J (OGC)
Subject:RE: [EXTERNAL] SMGS 11 (PTD 168-032) P&A sundry
Date:Wednesday, October 19, 2022 1:48:41 PM
Attachments:image001.png
image003.png
Bryan,
These are all of the records I have found (IADC reports) on the 9-5/8” cement job (see snapshots below). It doesn’t note any lost returns or other issues.
I’m unsure how the calculations on the schematic were made. Assuming 20% washout, and using a standard ~1.1 cu-ft per sack, I calculate a TOC of ~6400’ MD.
That said, I’m unfamiliar with the additives listed below. Usually additives give you more yield on the cement so would make for a shallower cement top, so using
1.1 give a conservative estimate.
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
Aras Worthington
Hilcorp Alaska LLC
Senior Technical Advisor for Alaska Operations
Aras.worthington@hilcorp.com
907-564-4763
907-440-7692 mobile
From: McLellan, Bryan J (OGC) <bryan.mclellan@alaska.gov>
Sent: Wednesday, October 19, 2022 10:47 AM
To: Aras Worthington <Aras.Worthington@hilcorp.com>
Subject: [EXTERNAL] SMGS 11 (PTD 168-032) P&A sundry
Aras,
What do you know about the 9-5/8” primary cement job? Did it go according to plan? Were there losses, packoffs, other issues? What is estimated TOC and how
was it determined?
Thanks
Bryan McLellan
Senior Petroleum Engineer
Alaska Oil & Gas Conservation Commission
333 W 7th Ave
Anchorage, AK 99501
Bryan.mclellan@alaska.gov
+1 (907) 250-9193
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have
received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email ortelephone if the sender's phone number is listed above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will notadversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
By Anne Prysunka at 2:25 pm, Oct 26, 2022
605 1250 sx, Cmt at surface
7\SHRI5HTXHVW $EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:HOO 2SHUDWLRQVVKXWGRZQ
6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDP
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HHQWHU6XVS:HOO $OWHU&DVLQJ 2WKHUBBBBBBBBBBBBBBBBBBB
2SHUDWRU1DPH &XUUHQW:HOO&ODVV 3HUPLWWR'ULOO1XPEHU
([SORUDWRU\ 'HYHORSPHQW
$GGUHVV6WUDWLJUDSKLF 6HUYLFH
$3,1XPEHU
,ISHUIRUDWLQJ:HOO1DPHDQG1XPEHU
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ" <HV 1R
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU )LHOG &XUUHQW3RROV
0LGGOH*URXQG6KRDO
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0'
6HHVFKHPDWLF
&DVLQJ &ROODSVH
6WUXFWXUDO
&RQGXFWRU
6XUIDFH SVL
,QWHUPHGLDWH
3URGXFWLRQ SVL
/LQHU SVL
3DFNHUVDQG66697\SH 3DFNHUVDQG66690'IWDQG79'IW
$WWDFKPHQWV 3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF :HOO&ODVVDIWHUSURSRVHGZRUN
'HWDLOHG2SHUDWLRQV3URJUDP %236NHWFK ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
(VWLPDWHG'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN
&RPPHQFLQJ2SHUDWLRQV 2,/ :,1- :'63/6XVSHQGHG
9HUEDO$SSURYDO 'DWH *$6 :$* *6725 63/8*
$2*&&5HSUHVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG
&RQWDFW1DPH$UDV:RUWKLQJWRQ
'DQ0DUORZH &RQWDFW(PDLO$UDV:RUWKLQJWRQ#KLOFRUSFRP
&RQWDFW3KRQH
$XWKRUL]HG7LWOH
2SHUDWLRQV
0DQDJHU
&RQGLWLRQVRIDSSURYDO1RWLI\$2*&&VRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
3OXJ,QWHJULW\ %237HVW 0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"<HV 1R
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG
$33529('%<
$SSURYHGE\ &200,66,21(5 7+($2*&& 'DWH
&RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ
66 /6
3HUIRUDWLRQ'HSWK0'IW
SVL
0'
SVL
/HQJWK 6L]H
3URSRVHG3RROV
79' %XUVW
35(6(17:(//&21',7,216800$5<
a 1$
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
$'/
&HQWHUSRLQW'ULYH6XLWH$QFKRUDJH$.
+LOFRUS$ODVND//&
1$
60*68QLW
()DQG*2LO0LGGOH*UQG6KRDO2LO 1$
SVL
7XELQJ*UDGH 7XELQJ0'IW
0'79'0'
79' 1$
3HUIRUDWLRQ'HSWK79'IW 7XELQJ6L]H
1 1
%DNHU0RGHO)3DFNHU[ 1$
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$2*&&86(21/<
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQYDOLGIRUPRQWKVIURPGDWHRIDSSURYDO6XEPLW3')WRDRJFFSHUPLWWLQJ#DODVNDJRY
By Anne Prysunka at 9:00 am, Oct 14, 2022
'LJLWDOO\VLJQHGE\'DQ0DUORZH
'1FQ 'DQ0DUORZH
RX 8VHUV
'DWH
'DQ0DUORZH
;
3URYLGH KUV QRWLFH IRU $2*&& RSSRUWXQLW\ WR ZLWQHVV FHPHQW SOXJ SUHVVXUH WHVWV DQG 72& WDJV
'65
;
%-0
'/%
$WWHPSW WR VTXHH]H XS WR EEOV RI FHPHQW RXWVLGH FDVLQJ GXULQJ LQWHUPHGLDWH FHPHQW MRE
*&:
Jessie L.
Chmielowski
Digitally signed by Jessie
L. Chmielowski
Date: 2022.10.20 11:51:35
-08'00'
RBDMS JSB 102422
3 $6XQGU\
:HOO'L
37'
tĞůůEĂŵĞ͗ŝͲϭϭ W/EƵŵďĞƌ͗ϱϬͲϳϯϯͲϮϬϭϬϰͲϬϬͲϬϬ
ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^ŚƵƚͲ/ŶWƌŽĚƵĐĞƌ ZŝŐ͗^>͕>͕&
ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗KĐƚŽďĞƌϮϬϮϮ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϮǁĞĞŬƐ
ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛Ě͍zĞƐ͗ϭϬͲϰϬϯ Wd͗ϭϲϴͲϬϯϮ
ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗:ƵĂŶŝƚĂ>ŽǀĞƚƚ
&ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ƌĂƐtŽƌƚŚŝŶŐƚŽŶ ϵϬϳͲϱϲϰͲϰϳϲϯ;KͿ
^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗<ĂƚŚĞƌŝŶĞKĐŽŶŶŽƌ ϵϬϳͲϳϳϳͲϴϯϳϲ;KͿ
ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ;ĞƐƚͿ͗ϯϳϱϬƉƐŝΛϵϮϬϬ͛ds;ĞƐƚ͘Ϳ
DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϯϴϬϬƉƐŝ
DĂdžŝŵƵŵWŽƚĞŶƚŝĂů^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϮϴϴϬƉƐŝ 'ĂƐŽůƵŵŶ'ƌĂĚŝĞŶƚ;Ϭ͘ϭƉƐŝͬĨƚͿ
ƵƌƌĞŶƚWƌĞƐƐƵƌĞƐd;>^Ϳͬd;^^Ϳͬ/ͬKͬKK͗ϬͬϮϱͬϭϭϬͬϯϬͬϬ
+LVWRU\
'ULOOHGDQGFRPSOHWHGLQDVDQRLOZHOODV6RXWK0LGGOH*U RXQG6KRDO8QLW1R7KHZHOO
ZDVFRQYHUWHGLQWRDZDWHULQMHFWLRQZHOOLQ'HFHPEHU,Q2FWREHUWKHZHOOZDV
UHFRPSOHWHGLQWRDGXDOVWULQJLQMHFWRU
$OHDNLQFDVLQJDW¶ZDVVTXHH]HGZLWKFHPHQWEXWDQ0,7,$IDLOHGDWSVL
7KHZHOOZDV6KXW,QLQGXHWRWXELQJ[,$FRPPXQLFDWLRQ
&XUUHQW6WDWXV
6KXWLQ
/6KDVPXOWLSOH(/6/ILVK/,+
´FRQGXFWRUVHWDW¶ZLWKFHPHQWUHWXUQVWRVXUIDFH7HVWHGWRSVLIRUPLQXWHV
´VXUIDFHFDVLQJVHWDW¶FHPHQWHGZLWKVDFNVRIFODVV*72&WDJJHGWKURXJK
WKH22$YDOYH#a¶0'
´LQWHUPHGLDWHVHWDW¶FHPHQWHGZLWKVDFNVFODVV*SSJPXGLQKROH1R
SUHVVXUHWHVWVUHFRUGHGDIWHUSULPDU\MRE/HDNLQFDVLQJDW¶0,7,$IDLOHGDWSVL
3 $6XQGU\
:HOO'L
37'
3UH3 $GLDJQRVWLFZRUNFRPSOHWHG
%OHG´[´DQQXOXV2$WRSVL
%OHGWKH´[´DQQXOXV22$WRSVL
%OHGWKH,$WRSVL
37¶GWKH/6DQG66WRSVL373DVV
&LUFXODWHGRZQ,$DQGRXW/6ESPSVLEXWFDQQRWFLUFXODWHGRZQ/6DQGRXW,$
6637¶GWRSVLDQGQRFRPPXQLFDWLRQZLWK/6RU,$
37¶G,$WRSVLDQGLQMHFWVDWESPSVL
37¶GWKH2$WRSVL1RLQMHFWLYLW\
37¶GWKH22$WRSVL1RLQMHFWLYLW\
66WDJJHG#¶6/0Z´*5
3XPS'\HGSLOOLQ5,:GRZQ,$ZLWKUHWXUQVIURP/63XPSEEOVVSDFHUDQGEEOG\HG
SLOO#ESP*RWUHWXUQVIURP/6#EEOVDZD\DQGFDXJKWSUHVVXUHESPSVL
3XPSHGEEOVDQGORVWEEOVWRWDO1RG\HUHWXUQHG/HDNLVGHHSHUWKDQa¶0'
)LVKHGWKUHHFXWWHUEDUVIURPWKH66DQGEURNHWKHZLUHRIIWKHWRSRIWKHVWXFN6/WRROVWULQJ
ZLWKDEOLQGER[$WWHPSWHGWRILVK6/ZLWKZLUHILQGHUDQGURSHVSHDUZLWKRXWVXFFHVV
6WUDS72&LQ22$#a¶0'
&7PLOOHGVFDOHLQ66DQGUHWULHYHGDOO6/FXWWHUEDUVDQG6/WRROVWULQJ0LOOHGVFDOHGRZQ
WR¶&70$WWHPSWWRSXPSGRZQ66ZLWKUHWXUQVIURP/61RUHWXUQVXS/6LQMHFWLQJ
#ESP#SVL&LUFXODWHGRZQ66ZLWKUHWXUQVIURP,$#ESP#SVL
5DQEDVHOLQH(/WHPSORJGRZQ66WRWDJ#a¶0'7RROVVWXFNRQERWWRP3XPS
GRZQ,$ZLWKUHWXUQVIURP66WRIUHHWRROV7ULHGWRLQMHFWLQWR,$EXWZLOOQRWLQMHFWDQ\PRUH
#SVL322+
5DQ´*5RQ6/LQ66WR¶ZQRLVVXHV
6HW´' '+ROHILQGHULQ66#a¶6/037IDLOHGDQGWRROVVWXFN/RVWVSDQJV
DQGF\FOHGRLOMDUVXQWLOF\FOHGRXW3XPSHGGRZQ,$ZUHWXUQVIURP66WRIUHHWRROV1R
VXFFHVV'URSSHGFXWWHUEDUDQGFXW6/DWWRSRIWRROV5HFRYHUHGDOO6/DQGFXWWHUEDU
1RWHWKH66PD\EHVSOLWDWERWWRPFDXVLQJWRROVWULQJVWRJHWVWXFNWKHUH
58(/DQGSHUIRUPEDVHOLQHSDVVWR¶0'VWLFN\ERWWRPHOHFWQRWWRJRGHHSHUGXHWR
VWXFNWRROULVN$WWHPSWWRLQMHFWLQWR,$#SVLQRLQMHFWLRQ3XPSGRZQ66ZLWK
UHWXUQVIURP,$DQGYHULI\WHPSHUDWXUHVKLIW#¶0'&LUFXODWLRQLVJRLQJGRZQ66
EHORZWRROVDQGXS,$/RJ22+DQGVHHQRRWKHUDQRPDOLHV
3HUIRUDWH66DQGLQWR/6#a¶(/0DVGHHSDVSRVVLEOHZLWKRXWVWLFNLQJWRROV
$6)
9HULI\FLUFXODWLRQIURP66WR/6ESP#SVL3XPSHGEEOVRI),:GRZQWKH66
ZLWKUHWXUQVIURPWKH/6ERWWRPVXSLVEEOV
2EMHFWLYH
3OXJDQGDEDQGRQWKHZHOOWRVXUIDFH7KH66LVSHUIRUDWHG#¶0'DQGFLUFXODWLRQGRZQ
WKH66DQGXSWKH,$KDVEHHQYHULILHGWREHEHORZ¶0'ZLWK(/WHPSHUDWXUHORJ
3UHYLRXVO\WKHUHZDVLQMHFWLYLW\GRZQWKH66DQGWKH,$EXWFXUUHQWO\WKHUHLVQRLQMHFWLYLW\LQWR
HLWKHU7KHSHUIRUDWLRQV#¶KDYHFUHDWHGFLUFXODWLRQGRZQWKH66DQGXSWKH/67KHUHLV
QRLQMHFWLYLW\LQWRWKH2$RU22$7KLVZHOOLVDJRRGFDQGLGDWHIRUDWKURXJKWXELQJIXOOERUH
3 $
3 $6XQGU\
:HOO'L
37'
+LOFRUSUHTXHVWVDYDULDQFHWR$$&F(+LOFRUSUHTXHVWVWKHH[LVWLQJSDFNHU
#a¶0'WREHXVHGLQSODFHRIDPHFKDQLFDOEULGJHSOXJDWDVHWKHLJKWRIIHHWDERYH
WKHH[LVWLQJORZHUSHUIRUDWHGLQWHUYDO&HPHQWZLOOEHSODFHGDERYHWKHSDFNHULQWKH7XELQJ[
,$7KHEDVHRIWKHSURSRVHG3 $SOXJLVDW¶0'7KHUHLVRQO\RQH3RROEHWZHHQWKDW
GHSWKDQGWKHWRSRISHUIRUDWLRQVDW¶0',WLVWKH0LGGOH*URXQG6KRDO() *2LO3RRO
+LOFRUSUHTXHVWVDYDULDQFHWR$$&G+LOFRUSUHTXHVWVWKDWWKHVXUIDFH
FHPHQWSOXJVH[WHQGXSWRWKHZHOOKHDGDQGWUHHYDOYHV7KLVLVWRHQVXUHWKHZHOOLVSURSHUO\
FHPHQWHGDQGWRDYRLGDQ\XQFHUWDLQW\DVWRWKHFHPHQWWRS7KHSODWIRUPOHJVDQGZHOOVZLOO
QHHGWREHVHYHUHGFRPSOHWHO\DWRUQHDUWKHVHDIORRUWRUHPRYHWKHOHJVHYHQWXDOO\DQGWKH
H[WUDFHPHQWLQWKHFDVLQJVVKRXOGQRWLPSHGHWKLVRSHUDWLRQVLJQLILFDQWO\
9DULDQFH DSSURYHG EMP
3URSRVHG EDVH RI FHPHQW SOXJ LV
DERYH WRS SHUI
3 $6XQGU\
:HOO'L
37'
3URFHGXUH
)XOOERUH
9HULI\FLUFXODWLRQGRZQWKH66DQGRXWWKH/6DQG,$
3XPS66[/6[,$[5HVHUYRLUFHPHQWSOXJDVIROORZV
¾ EEOV5,:Z6XUIDFWDQW:DVKGRZQ66DQGRXW,$
¾ EEOVSSJEULQHGRZQ66DQGRXW,$
¾ EEOVSSJ&ODVV*FHPHQWGRZQ66WDNLQJUHWXUQVIURPWKH/6
L :KHQEEOVRIFHPHQWDUHDZD\VZDSWRWDNHUHWXUQVIURPWKH,$
LL /DXQFKIRDPZLSHUEDOOEHKLQGFHPHQWDQGFKDVHZLWKEEOVSSJ
EULQHFRQWLQXHWRWDNHUHWXUQVIURPWKH,$
LLL :KHQEEOVEULQHDUHDZD\VZDSWRWDNLQJUHWXUQVIURPWKH/6
1RWHEEOVRISSJEULQHGLVSODFHPHQWSXWV72&LQ66#a¶
HTXLYDOHQWZLWK,$DQG/6
9ROXPHV
¾ /6YROXPHIURPSHUIRUDWLRQVWR¶0'ESI
¶¶ EEOV
¾ ,$YROXPHIURPSHUIRUDWLRQVWR¶0'ESI
¶±¶ EEOV
¾ 66YROXPHIURPSHUIRUDWLRQVWR¶0'ESI
¶¶ EEOV
7RWDO&HPHQW9ROXPHEEOV
¾ 66YROXPHIURPSHUIRUDWLRQVWRVXUIDFHESI
¶ EEOV
¾ ,$YROXPHIURP¶0'WRVXUIDFHESI
¶ EEOV
¾ /6YROXPHIURP¶0'WRVXUIDFHESI
¶ EEOV
¾ 66YROXPHIURP¶0'WRVXUIDFHESI
¶ EEOV
)XOOERUH6OLFNOLQH(OLQH
&0,7/6[66WRSVL$2*&&:LWQHVVHG
1RWH$Q0,7RIWKH,$ZLOOQRWSDVVGXHWRWKHFDVLQJOHDN#a¶0'
7DJ72&LQ66$2*&&:LWQHVVHG
3HUIRUDWHWKH66/6DQG´FDVLQJ#a¶0'
)XOOERUH
9HULI\FLUFXODWLRQGRZQWKH66RXWWKH,$DQG/6
3XPS66[,$[/6LQWHUPHGLDWHFHPHQWSOXJ
¾ EEOVSSJ&ODVV*FHPHQWGRZQWKH66ZLWKUHWXUQVIURPWKH,$
L :KHQEEOVRIFHPHQWDUHDZD\VZDSWRWDNLQJUHWXUQVIURPWKH/6
LL &LUFXODWHRXWWKH/6XQWLOJRRGFHPHQWUHWXUQVWRVXUIDFH
LLL /DXQFKIRDPEDOODQGGLVSODFHZLWKEEOVSSJEULQH
9ROXPHV
¾ /6YROXPHIURPSHUIRUDWLRQVWRVXUIDFHESI
¶ EEOV
¾ ,$YROXPHIURPSHUIRUDWLRQVWR¶0'ESI
¶±¶ EEOV
¾ 66YROXPHIURPSHUIRUDWLRQVWR¶0'ESI
¶¶ EEOV
7RWDO&HPHQW9ROXPHEEOV
¾ 66YROXPHIURPSHUIRUDWLRQVWRVXUIDFHESI
¶ EEOV
¾ 66YROXPHIURP¶0'WRVXUIDFHESI
¶ EEOV
7DJ 72& LQ /6 DOVR EMP
LY $SSO\ VTXHH]H SUHVVXUH RI SVL WR ,$ 'R QRW GLVSODFH PRUH WKDQ EEOVEMP
3 $6XQGU\
:HOO'L
37'
)XOOERUH6OLFNOLQH(OLQH
&0,766[,$WRSVL$2*&&:LWQHVVHG
7DJ72&LQ66
3HUIRUDWHWKH66/6´DQG´FDVLQJ#a¶0'
)XOOERUH
9HULI\FLUFXODWLRQGRZQWKH66RXW,$2$22$DQG/622$PD\QRWFLUFXODWHVLQFH
72&LQ22$WDJJHG#a¶0'DQG/6PD\QRWFLUFXODWHEHFDXVHLWZDVFHPHQWHGWR
VXUIDFHLQVWHS
3XPS66[,$[2$[22$[/6FHPHQWSOXJ
¾ EEOV),:Z6XUIDFWDQW:DVKGRZQ66WDNLQJUHWXUQVIURPWKH22$LI
FLUFXODWLRQHVWDEOLVKHGRXW22$
L &LUFXODWHEEOVLQWR22$LIFLUFXODWLRQHVWDEOLVKHG
LL &LUFXODWHEEOVLQWR2$
LLL &LUFXODWHEEOVLQWR,$
¾ &LUFXODWH[ERWWRPVXSZLWK),:IURP22$2$DQG,$
¾ EEOVSSJ&ODVV*FHPHQW
L &LUFXODWHRXWWKH22$XQWLOJRRGFHPHQWUHWXUQVLIFLUFXODWLRQ
HVWDEOLVKHG
LL &LUFXODWHRXWWKH2$XQWLOJRRGFHPHQWUHWXUQVDUHREVHUYHGDWVXUIDFH
LLL &LUFXODWHRXWWKH,$XQWLOJRRGFHPHQWUHWXUQVDUHREVHUYHGDWVXUIDFH
LY &LUFXODWHRXWWKH/6XQWLOJRRGFHPHQWUHWXUQVLIFLUFXODWLRQHVWDEOLVKHG
¾ 6,DOODQQXOLH[FHSWWKH22$DQGVTXHH]HWRSVL
9ROXPHV
¾ 22$IURP¶WRVXUIDFH¶[ EEOV
¾ 2$IURP¶WRVXUIDFH¶
ESI EEOV
¾ ,$IURP¶0'WRVXUIDFH¶[ESI EEOV
¾ 66IURP¶0'WRVXUIDFH¶[ESI EEOV
¾ /6IURP¶0'WRVXUIDFH¶[ESI EEOV
¾7RWDO&HPHQW9ROXPHEEOV
$WWDFKPHQWV
&XUUHQW6FKHPDWLF
3URSRVHG6FKHPDWLF
/RJRI&RQILQLQJ=RQHV
3 $6XQGU\
:HOO'L
37'
'L&XUUHQW
3 $6XQGU\
:HOO'L
37'
'L3URSRVHG
3 $6XQGU\
:HOO'L
37'
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE:
P.I. Supervisor
SUBJECT:
FROM:
Petroleum Inspector
Section: 35 Township: 8N Range: 13W Meridian: Seward
Drilling Rig: N/A Rig Elevation: N/A Total Depth: 10508 ft MD Lease No.: ADL 0018746
Operator Rep: Suspend: P&A: XXX
Conductor: 20" O.D. Shoe@ 605 Feet Csg Cut@ Feet
Surface: 13 3/8" O.D. Shoe@ 2001 Feet Csg Cut@ Feet
Production 9 5/8" O.D. Shoe@ 9676 Feet Csg Cut@ Feet
Liner 7" O.D. Shoe@ 10502 Feet Csg Cut@ Feet
SS Tubing: 3 1/2" x 2 7/8" O.D. Tail@ 9310 Feet Tbg Cut@ Feet
LS Tubing: 3 1/2" x 2 7/8" O.D. Tail@ 10106 Feet Tbg Cut@ Feet
Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified
Fullbore Balanced 9074 ft SS 6718 ft 9.8 ppg Wireline tag
Pre-Test Initial 15 min 30 min 45 min Result
Tubing
IA
OA
OOA
Remarks:
Attachments:
Harold Soule
Casing/Tubing Data (depths are MD):
Plugging Data (depths are MD):
Hilcorp decided to wait and let the cement set up more as it was just pumped yesterday. No Long String tubing tag required per
email from AOGCC dated 10/21/2022.
September 23, 2022
Brian Bixby
Well Bore Plug & Abandonment
S MSG UNIT Dillon 11
Hilcorp Alaska LLC
PTD 1680320; Sundry 322-602
none
Test Data:
Casing Removal:
rev. 11-28-18 2022-1023_Plug_Verification_SMGS_Di-11_bb
'LOORQUHTXLUHVWHVWIRUSOXJYHULILFDWLRQMEU
9
9
9 9 9 9
99
9
9
9
9
9
9
9
9
let the cement set up more as it was just pumped yesterday.
James B. Regg Digitally signed by James B. Regg
Date: 2022.10.27 16:04:42 -08'00'
By Anne Prysunka at 9:11 am, Sep 19, 2022
7\SHRI5HTXHVW$EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:HOO 2SHUDWLRQVVKXWGRZQ
6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDP
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HHQWHU6XVS:HOO $OWHU&DVLQJ
2SHUDWRU1DPH&XUUHQW:HOO&ODVV 3HUPLWWR'ULOO1XPEHU
([SORUDWRU\ 'HYHORSPHQW
$GGUHVV6WUDWLJUDSKLF 6HUYLFH
$3,1XPEHU
,ISHUIRUDWLQJ:HOO1DPHDQG1XPEHU
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ"<HV 1R
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU)LHOG3RROV
7RWDO'HSWK0'IW7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0'
6HHVFKHPDWLF
&DVLQJ &ROODSVH
6WUXFWXUDO
&RQGXFWRU
6XUIDFH SVL
,QWHUPHGLDWH
3URGXFWLRQ SVL
/LQHU SVL
3DFNHUVDQG66697\SH3DFNHUVDQG66690'IWDQG79'IW
$WWDFKPHQWV3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF :HOO&ODVVDIWHUSURSRVHGZRUN
'HWDLOHG2SHUDWLRQV3URJUDP %236NHWFK ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
(VWLPDWHG'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN
&RPPHQFLQJ2SHUDWLRQV2,/ :,1- :'63/6XVSHQGHG
9HUEDO$SSURYDO'DWH *$6 :$* *6725 63/8*
$2*&&5HSUHVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG
&RQWDFW1DPH $UDV:RUWKLQJWRQ
&RQWDFW(PDLO
&RQWDFW3KRQH
$XWKRUL]HG7LWOH
&RQGLWLRQVRIDSSURYDO1RWLI\$2*&&VRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
3OXJ,QWHJULW\%237HVW 0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"<HV 1R
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG
$33529('%<
$SSURYHGE\ &200,66,21(5 7+($2*&& 'DWH
&RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ
aSVL 1$
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$2*&&86(21/<
'DQ0DUORZH2SHUDWLRQV0DQDJHU
$UDVZRUWKLQJWRQ#KLOFRUSFRP
SVL
7XELQJ*UDGH7XELQJ0'IW3HUIRUDWLRQ'HSWK79'IW7XELQJ6L]H
%DNHU0RGHO)3DFNHU[ 1$0'79'0'79' 1$
66 /6
35(6(17:(//&21',7,216800$5<
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
$'/
60*68QLW
0LGGOH*URXQG6KRDO)LHOG()DQG*2LO0LGGOH*UQG6KRDO2LO3RROV
1$
&HQWHUSRLQW'ULYH6XLWH
$QFKRUDJH$.
+LOFRUS$ODVND//&
2WKHU3UH3 $'LDJQRVWLFV&7&2
/HQJWK 6L]H
1 1
79'%XUVW
SVL
0'
SVL
3HUIRUDWLRQ'HSWK0'IW
3 2
W
V
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO
By Samantha Carlisle at 9:24 am, Sep 12, 2022
'LJLWDOO\VLJQHGE\'DQ0DUORZH
'1FQ 'DQ0DUORZH
RX 8VHUV
'DWH
'DQ0DUORZH
'65
;
'/%
&7 %23 WHVW WR SVL
;
%-0
GWV -/&
Jeremy Price Digitally signed by Jeremy Price
Date: 2022.09.16 12:40:26 -08'00'
3 $6XQGU\
:HOO'L
37'
tĞůůEĂŵĞ͗ŝͲϭϭW/EƵŵďĞƌ͗ϱϬͲϳϯϯͲϮϬϭϬϰͲϬϬͲϬϬ
ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^ŚƵƚͲ/ŶWƌŽĚƵĐĞƌZŝŐ͗^>͕>͕d
ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗^ĞƉƚĞŵďĞƌϮϬϮϮƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϮǁĞĞŬƐ
ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛Ě͍zĞƐ͗ϭϬͲϰϬϯWd͗ϭϲϴͲϬϯϮ
ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗:ƵĂŶŝƚĂ>ŽǀĞƚƚ
&ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ƌĂƐtŽƌƚŚŝŶŐƚŽŶϵϬϳͲϱϲϰͲϰϳϲϯ;KͿ
^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗<ĂƚŚĞƌŝŶĞKĐŽŶŶŽƌϵϬϳͲϳϳϳͲϴϯϳϲ;KͿ
ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ;ĞƐƚͿ͗ϯϳϱϬƉƐŝΛϵϮϬϬ͛ds;ĞƐƚ͘Ϳ
DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϯϴϬϬƉƐŝ
DĂdžŝŵƵŵWŽƚĞŶƚŝĂů^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϮϴϴϬƉƐŝ 'ĂƐŽůƵŵŶ'ƌĂĚŝĞŶƚ;Ϭ͘ϭƉƐŝͬĨƚͿ
ƵƌƌĞŶƚWƌĞƐƐƵƌĞƐd;>^Ϳͬd;^^Ϳͬ/ͬKͬKK͗ϬͬϮϱͬϭϭϬͬϯϬͬϬ
+LVWRU\
'ULOOHGDQGFRPSOHWHGLQDVDQRLOZHOODV6RXWK0LGGOH*URXQG6KRDO8QLW1R7KHZHOO
ZDVFRQYHUWHGLQWRDZDWHULQMHFWLRQZHOOLQ'HFHPEHU,Q2FWREHUWKHZHOOZDV
UHFRPSOHWHGLQWRDGXDOVWULQJLQMHFWRU
$OHDNLQFDVLQJDW¶ZDVVTXHH]HGZLWKFHPHQWEXWDQ0,7,$IDLOHGDWSVL
7KHZHOOZDV6KXW,QLQGXHWRWXELQJ[,$FRPPXQLFDWLRQ
&XUUHQW6WDWXV
6KXWLQ
/6DQG66KDYHPXOWLSOH6/DQG(/ILVKVWXFNLQWKHWXELQJ
´FRQGXFWRUVHWDW¶ZLWKFHPHQWUHWXUQVWRVXUIDFH7HVWHGWRSVLIRUPLQXWHV
´VXUIDFHFDVLQJVHWDW¶FHPHQWHGZLWKVDFNVRIFODVV*72&WDJJHGWKURXJK
WKH22$YDOYH#a¶0'
´LQWHUPHGLDWHVHWDW¶FHPHQWHGZLWKVDFNVFODVV*SSJPXGLQKROH1R
SUHVVXUHWHVWVUHFRUGHGDIWHUSULPDU\MRE/HDNLQFDVLQJDW¶0,7,$IDLOHGDWSVL
66ILVKFXUUHQWO\/,+DVIROORZV
¾ ¶RI´6/
¾
;¶''EDLOHU
ILVKQHFN
;
ER[;SLQ[RYHU´ILVK
QHFN;
VSDQJMDUV
ILVKQHFN;
RLOMDUV
ILVKQHFN
;
NQXFNOHMRLQW
ILVKQHFN;
VWHP
ILVKQHFN;
VWHP
ILVKQHFN;
URSHVRFNHW
ILVKQHFN
2EMHFWLYH
&OHDUVFDOHIURP66DQGUHFRYHU6/DQG6/WRROVWULQJ&OHDUVFDOHWRSDUDOOHOMHWSXPSFDYLW\WR
DOORZIRU3 $GLDJQRVWLFVDQG3 $
3 $6XQGU\
:HOO'L
37'
3UH3 $GLDJQRVWLFZRUNFRPSOHWHG
%OHG´[´DQQXOXV2$WRSVL
%OHGWKH´[´DQQXOXV22$WRSVL
%OHGWKH,$WRSVL
37¶GWKH/6DQG66WRSVL373DVV
&LUFXODWHGRZQ,$DQGRXW/6ESPSVLEXWFDQQRWFLUFXODWHGRZQ/6DQGRXW,$
6637¶GWRSVLDQGQRFRPPXQLFDWLRQZLWK/6RU,$
37¶G,$WRSVLDQGLQMHFWVDWESPSVL
37¶GWKH2$WRSVL1RLQMHFWLYLW\
37¶GWKH22$WRSVL1RLQMHFWLYLW\
66WDJJHG#¶6/0Z´*5
3XPS'\HGSLOOLQ5,:GRZQ,$ZLWKUHWXUQVIURP/63XPSEEOVVSDFHUDQGEEOG\HG
SLOO#ESP*RWUHWXUQVIURP/6#EEOVDZD\DQGFDXJKWSUHVVXUHESPSVL
3XPSHGEEOVDQGORVWEEOVWRWDO1RG\HUHWXUQHG/HDNLVGHHSHUWKDQa¶0'
)LVKHGWKUHHFXWWHUEDUVIURPWKH66DQGEURNHWKHZLUHRIIWKHWRSRIWKHVWXFN6/WRROVWULQJ
ZLWKDEOLQGER[$WWHPSWHGWRILVK6/ZLWKZLUHILQGHUDQGURSHVSHDUZLWKRXWVXFFHVV
1R SOXJV ZHUH VHW 37
G DJDLQVW ILVK DQG GHEULV LQ WEJ SHU $ :RUWKLQJRQ
EMP
3 $6XQGU\
:HOO'L
37'
3URFHGXUH
&RLOHG7XELQJ
)XQFWLRQ3UHVVXUH7HVW%23(WRSVLORZSVLKLJKXQOHVVD%23WHVWKDVEHHQ
SHUIRUPHGLQWKHSUHYLRXVVHYHQGD\VRQD'LOORQZHOOWRDQHTXLYDOHQWSUHVVXUH
5,+Z0RWRUDQG´PLOOLQWRVKRUWVWULQJ0LOOVFDOHGRZQWRWRSRI6/ZLUH#a¶
6/0322+
5XQZLUHILQGHUDQGURSHVSHDUWREDOOXSZLUHDQGILVK22+
5XQ0RWRUDQG´PLOODQGPLOOVFDOHGRZQWR6/76322+
5,+ZILVKLQJWRROVIRU6/WRROVWULQJDQGUHFRYHU6/76
5XQ0RWRUDQG´PLOODQGPLOOVFDOHGRZQWR;2#¶0'
&KHFNIRUFLUFXODWLRQGRZQ66DQGRXW/6
5'02&7
6OLFNOLQH
6HW´' '+ROHILQGHULQ66#a¶6/0
3766WRSVLIRUPLQXWHV
3XOO+ROHILQGHUDQG5'026/
(OLQH
3XQFK66#a¶(/0DVGHHSDVSRVVLEOH
3HUIRUDWH66DQGLQWR/6#a¶(/0DVGHHSDVSRVVLEOHLIFLUFXODWLRQZDVQRW
HVWDEOLVKHGIURPWKH66WRWKH/6LQVWHS
9HULI\FLUFXODWLRQIURP66WR,$DQG66WR/6
$WWDFKPHQWV
&XUUHQW6FKHPDWLF
&7%23('LDJUDP
)OXLG)ORZ'LDJUDP
$WWHPSW WR HVWDEOLVK LQMHFWLYLW\ 66 LQWR SHUIV EMP
3 $6XQGU\
:HOO'L
37'
'L&XUUHQW
3 $6XQGU\
:HOO'L
37'
3 $6XQGU\
:HOO'L
37'
7\SHRI5HTXHVW $EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:HOO 2SHUDWLRQVVKXWGRZQ
6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDP
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HHQWHU6XVS:HOO $OWHU&DVLQJ
2SHUDWRU1DPH &XUUHQW:HOO&ODVV3HUPLWWR'ULOO1XPEHU
([SORUDWRU\ 'HYHORSPHQW
$GGUHVV6WUDWLJUDSKLF 6HUYLFH
$3,1XPEHU
,ISHUIRUDWLQJ:HOO1DPHDQG1XPEHU
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ" <HV 1R
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU)LHOG3RROV
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0'
6HHVFKHPDWLF
&DVLQJ &ROODSVH
6WUXFWXUDO
&RQGXFWRU
6XUIDFH SVL
,QWHUPHGLDWH
3URGXFWLRQ SVL
/LQHU SVL
3DFNHUVDQG66697\SH 3DFNHUVDQG66690'IWDQG79'IW
$WWDFKPHQWV 3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF :HOO&ODVVDIWHUSURSRVHGZRUN
'HWDLOHG2SHUDWLRQV3URJUDP %236NHWFK ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
(VWLPDWHG'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN
&RPPHQFLQJ2SHUDWLRQV 2,/ :,1- :'63/6XVSHQGHG
9HUEDO$SSURYDO 'DWH *$6 :$* *6725 63/8*
$2*&&5HSUHVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG
&RQWDFW1DPH $UDV:RUWKLQJWRQ
&RQWDFW(PDLO
&RQWDFW3KRQH
$XWKRUL]HG7LWOH
&RQGLWLRQVRIDSSURYDO1RWLI\$2*&&VRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
3OXJ,QWHJULW\ %237HVW 0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"<HV 1R
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG
$33529('%<
$SSURYHGE\ &200,66,21(5 7+($2*&& 'DWH
&RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ
1$
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$2*&&86(21/<
'DQ0DUORZH2SHUDWLRQV0DQDJHU
$UDVZRUWKLQJWRQ#KLOFRUSFRP
SVL
7XELQJ*UDGH 7XELQJ0'IW3HUIRUDWLRQ'HSWK79'IW 7XELQJ6L]H
%DNHU0RGHO)3DFNHU[ 1$ 0'79'0'79' 1$
0D\
66 /6
35(6(17:(//&21',7,216800$5<
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
$'/
60*68QLW
0LGGOH*URXQG6KRDO)LHOG()DQG*2LO0LGGOH*UQG6KRDO2LO3RROV
1$
&HQWHUSRLQW'ULYH6XLWH
$QFKRUDJH$.
+LOFRUS$ODVND//&
2WKHU3UH3 $'LDJQRVWLFV
/HQJWK 6L]H
1 1
79' %XUVW
SVL
0'
SVL
3HUIRUDWLRQ'HSWK0'IW
U\
6WDWX
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO
By Meredith Guhl at 3:36 pm, May 06, 2022
'LJLWDOO\VLJQHGE\'DQ0DUORZH
'1FQ 'DQ0DUORZH
RX 8VHUV
'DWH
'DQ0DUORZH
'/%
;
%-0
/LPLW LQMHFWLRQ YROXPH LQWR 2$ WR EEOV DQG 22$ WR EEO DIWHU OLTXLGSDFNLQJ WKH DQQXOL EMP
'65
JLC 5/17/2022
Jeremy Price
Digitally signed by Jeremy
Price
Date: 2022.05.18 11:01:54
-08'00'
RBDMS SJC 052322
3 $6XQGU\
:HOO'L
37'
tĞůůEĂŵĞ͗ŝͲϭϭ W/EƵŵďĞƌ͗ϱϬͲϳϯϯͲϮϬϭϬϰͲϬϬͲϬϬ
ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^ŚƵƚͲ/ŶWƌŽĚƵĐĞƌ ZŝŐ͗^>͕&
ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗DĂLJϮϬϮϮ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϭǁĞĞŬ
ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛Ě͍zĞƐ͗ϭϬͲϰϬϯ Wd͗ϭϲϴͲϬϯϮ
ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗:ƵĂŶŝƚĂ>ŽǀĞƚƚ
&ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ƌĂƐtŽƌƚŚŝŶŐƚŽŶ ϵϬϳͲϱϲϰͲϰϳϲϯ;KͿ
^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗dŽĚĚ^ŝĚŽƚŝ ϵϬϳͲϳϳϳͲϴϰϰϯ;KͿ
ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ;ĞƐƚͿ͗ϯϳϱϬƉƐŝΛϵϮϬϬ͛ds;ĞƐƚ͘Ϳ
DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϯϴϬϬƉƐŝ
DĂdžŝŵƵŵWŽƚĞŶƚŝĂů^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϮϴϴϬƉƐŝ 'ĂƐŽůƵŵŶ'ƌĂĚŝĞŶƚ;Ϭ͘ϭƉƐŝͬĨƚͿ
ƵƌƌĞŶƚWƌĞƐƐƵƌĞƐd;>^Ϳͬd;^^Ϳͬ/ͬKͬKK͗ϬͬϮϱͬϭϭϬͬϯϬͬϬ
+LVWRU\
'ULOOHGDQGFRPSOHWHGLQDVDQRLOZHOODV6RXWK0LGGOH*URXQG6KRDO8QLW1R7KHZHOO
ZDVFRQYHUWHGLQWRDZDWHULQMHFWLRQZHOOLQ'HFHPEHU,Q2FWREHUWKHZHOOZDV
UHFRPSOHWHGLQWRDGXDOVWULQJLQMHFWRU
$OHDNLQFDVLQJDW¶ZDVVTXHH]HGZLWKFHPHQWEXWDQ0,7,$IDLOHGDWSVL
7KHZHOOZDV6KXW,QLQGXHWRWXELQJ[,$FRPPXQLFDWLRQ
&XUUHQW6WDWXV
6KXWLQ
/6DQG66KDYHPXOWLSOH6/DQG(/ILVKVWXFNLQWKHWXELQJ
2EMHFWLYH
3UH3 $GLDJQRVWLFV
3URFHGXUH
6OLFNOLQH)XOOERUH
%OHHG´[´DQQXOXV2$1RWHIOXLGVJDVUHWXUQHGDQGEXLOGXSUDWHDIWHU6,
%OHHGWKH´[´DQQXOXV22$1RWHIOXLGVJDVUHWXUQHGDQGEXLOGXSUDWHDIWHU6,
%OHHGWKH/666DQG,$1RWHIOXLGVJDVUHWXUQHGDQGEXLOGXSUDWHDIWHU6,
9HULI\FLUFXODWLRQGRZQ/6DQGRXW,$0D[WXELQJSUHVVXUHSVL
9HULI\FLUFXODWLRQGRZQ/6DQGRXW660D[WXELQJSUHVVXUHSVL
9HULI\FLUFXODWLRQGRZQ66DQGRXW,$0D[WXELQJSUHVVXUHSVL
37WKH/6[66[,$WRSVLIRUILYHPLQXWHV3HUIRUPLQMHFWLYLW\WHVWWRSVLLI37IDLOV
3XPSGRZQ´[´2$DQQXOXVZLWKGLHVHOWRHVWDEOLVKLQMHFWLYLW\0D[SUHVVXUH
SVL
3XPSGRZQWKH´[´22$DQQXOXVZLWKGLHVHOWRHVWDEOLVKLQMHFWLYLW\0D[
SUHVVXUHSVL
'ULIW WDJWRSRIILVKLQ/6 66
3XPSG\HGSLOORI),:GRZQ/6WDNLQJUHWXUQVIURP660D[LPXP/6SUHVVXUHSVL
&KDVHG\HGSLOOZLWKaEEOV),:9HULI\ZKHQG\HGSLOOLVUHWXUQHGWRVXUIDFHWRHVWLPDWH
FRPPXQLFDWLRQGHSWK
9ROXPHV
/LPLW LQMHFWLRQ YROXPH LQWR 2$ WR EEOV DQG 22$ WR EEO DIWHU OLTXLGSDFNLQJ WKH DQQXOL EMP
3 $6XQGU\
:HOO'L
37'
¾ /6VXUIDFHWRSDFNHU¶[ESI EEOV
¾ 66VXUIDFHWRSDFNHU¶[ESI EEOV
¾ ,$VXUIDFHWRSDFNHU¶[ESI EEOV
$WWDFKPHQWV
&XUUHQW6FKHPDWLF
3 $6XQGU\
:HOO'L
37'
')
,"
~r~~E :i IÆ~!Æ~~«!Æ
A.I~A.SKA. OILAlWD GAS
CONSERVATION COMMISSION
Mr. Dave Cole
Oil Team Manager
UNOCAL
P.O. Box 196247
Anchorage, AK 99516-6247
Re:
Middle Ground Shoal Unit
Platforms Dillon and Baker
Dear Mr. Cole:
)
FRANK H. MURKOWSK/, GOVERNOR
333 W. "JTH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
.~
" ."",'""'"f1:.",,,,,"", x,.,.,." 0
\:~~
This letter confinns your conversation with Commission Engineer Tom Maunder last week regarding the
multiple Applicatìons for Sundry Approval (Form 403) you submitted in mid October regarding changing
the monitoring frequency on the 16 wells on Dillon Platform and 23 wells on Baker Platform. Production
and injection operations were halted on these platforms in 4th Q 2002 and 2nd Q 2003 respectively.
Attached, please fmd the Sundry Applications, which are being returned without approval~ because the
relief you request needs to be sought through a different procedure.
The intent of submitting sundry notices for each well was to establish a monthly pressure and general
monitoring frequency for all wells on Dillon and Baker. There is a requirement in place for some of the
water injection wells that pressures and rates are to be monitored daily and reported monthly. Since the
platforms are unmanned and not operating, it is not possible to obtain daily information. When
operations were curtailed, a monthly monitoring frequency was established in the Plans of Development
(POD) annually filed with the Division of Oil and Gas and Unocal desires to assure that this monitoring
scheme is accepted by the Commission.
As noted in the conversation, changing the monitoring frequency where presently in place and
establishing a monthly monitoring frequency in general is not an action that is best accomplished with
multiple sundry notices. A letter application requesting the desired monitoring schedule should be made
under the applicable Area Injection Orders (AlO 7 for Baker and AIO 8 for Dillon) and Conservation
Orders (CO 44 and CO 54) for the platforms/unit. The Commission looks forward to receiving your letter
applications. If prior monthly monitoring information has not been submitted to the Commission, that
information should be ubmitted forthwith.
¡:, Sincere~~
. No an Daniel T. Seamount, Jr.
Commissioner
BY ORDER OF THE COMMISSION
DATED this _day of November, 2004
S'"'C'A' N' ,~iEn l'ln\! ~~ å. '20[\[1
~~ J ~ '\i £"..." ì OJ t..J,' ,~I ~ J ~
Ene!.
, '
l'
...
Abandon U
Alter casing 0
Change approved program 0
2. Operator Name: Union Oil of California
aka Unocal
BakerMod. 'F1'
Baker seal assembly
12. Attachments: Description Summary of Proposal ~
Detailed Operations Program 0 BOP Sketch 0
14. Estimated Date for
1. Type of Request:
3. Address:
7. KB Elevation (ft):
110' KB ABOVE MSL
8. Property Designation:
Dillon
11.
Total Depth MD (ft):
10,508'
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation Depth MD (ft):
10,140 to 10,310'
Packers and SSSV Type:
Commencing Operations:
16. Verbal Approval:
605' 20"
2,501' 13-3/8"
9,676' 9-5/8"
1,073' 7"
Perforation Depth TVD (ft):
9,817 to 9,983'
P. O. Box 196247
Anchorage, Ak. 99519-6247
Total Depth TVD (ft):
10,170'
Length
') STATE OF ALASKA --") RE EIVED
ALAS!'",", OIL AND GAS CONSERVATION COMMI~v(ON 004
APPLICATION FOR SUNDRY APPROVAL OCT 1 2 2
20 AAC 25.280
Operational shutdown U
Plug Perforations 0
Perforate New Pool 0
4. Current Well Class:
Suspend U
Repair well 0
Pull Tubing 0
1M. ,t n:t &.S:i~ ~~ ~. CnmmissÎcm
Perforate ~ë5~\\i4 VI waiver, Annular Dispos. U
Stimulate 0 Time Ext~qfJ~!j e Other 0
Re-enter Suspended Well 0 Monitor Frequency
5. Permit to Drill Number:
Development
Stratigraphic
0
0
Exploratory 0 68-32
Service 0 6. API Number:
50-733-20104-00
9. Well Name and Number:
Di-11
10. Field/Pools(s):
Middle Ground Shoal/"G"
PRESENT WELL CONDITION SUMMARY T'
Effective Depth MD (ft): Effective Depth TVD (ft): Plu (measured):
10,325' 9,996'
Size MD TVjÝ Burst
/
/
/
/
j
9,676' / 9,356'
9,429-10,5,92' 9,110'-10,164'
Tubing Size:/ ITubing Grade: ITUbing MD (ft):
31/2" N-80 Dual to 9,272' 27/8" N-80 Single to 10,128'
Packers and SSSV MD (ft): 9,320'
10,127
Junk (measured):
Fish @ 9,938'
Collapse
605'
604'
2,001'
1,975'
13. Well Class after proposed work:
Exploratory 0 Development
15. Well Status after proposed work:
Oil 0 Gas 0
WAG 0 GINJ 0
0
Service
0
0
0
Abandoned
0
0
Plugged
WINJ
Date:
WDSPL
Commission Representative:
17. I hereby certify that the foregoing is true and correct
Printed Nam¡/) ~,"Ie
Signature #d(/~~
the best of my knowledge. Contact
Title Oil Team Supervisor
907-263-7805 Date
COMMISSION USE ONLY
28-Sep-2004
Conditions of approval: Notify Commission so that a representative may witness
Plug Integrity
Other:
Subsequent Form Required:
Approved by:
0
BOP Test 0
Sundry Number:
--
2">l.J '-1- 4,;J-':J
Mechanical Integrity Test
0
Location Clearance
0
,<BDMS BFL NOV 2 2 2DD4 0 RIG I N A L
I.{ 0'3
Form 10-462rRevised 12/2003
APPLICATION RETURNED 11/17/04
NOT APPROVED BY COMMISSION
COMMISSIONER
BY ORDER OF
THE COMMISSION
Date:
Submit in Duplicate
STATE OF ALASKA t~~,(;Ervl'-'
ALASKA OIL AND GAS CONSERVATION COMMISSION ?i:q 2 6 2004
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon
Performed: Alter Casing D
Change Approved Program D
2. Operator Union Oil of California
Name: aka Unocal
Suspend
Repair Well D
Pull Tubing D
Operation Shutdown
Plug Perforations D
Perforate New Pool D
4. Current Well Class:
Development D
Stratigraphic D
3. Address:
P. O. Box 196247
Anchorage, Ak. 99519-6247
7. KB Elevation (ft):
110' KB ABOVE MSL
8. Property Designation:
Dillon
11. Present Well Condition Summary:
Total Depth measured 10,508' feet
true vertical 10,170' feet
Effective Depth measured 10,325' feet
true vertical 9,996' feet
Casing Length Size MD
Structural
Conductor 60S' 20" 60S'
Surface 2,501' 13-3/8" 2,001'
Intermediate
Production 9,676' 9-5/8" 9,676'
Liner 1,073' 7" 9,429-10,502'
Perforation depth:
Measured depth: (See Attached Well bore Schematic)
True Vertical depth:
Tubing: (size, grade, and measured depth)
3 1/2" N-80 Dual to 9,272'
27/8" N-80 Single to 10,128'
BakerMod. 'F1' @ 9,320'
BakerMod. 'F1' @ 10,105'
Packers and SSSV (type and measured depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13.
Perforate Waiver Other J
Stimulate D Time Extension D Shut in and secure
Re-enter Suspended Well D
5. Permit to Drill Number:
Exploratory D 68-32
Service 0 6. API Number:
50-733-20104-00
9. Well Name and Number:
Di-11
10. Field/Pool(s):
Middle Ground Shoall"G"
Plugs (measured)
Junk (measured) fish @ 9,938'
TVD
Burst
Collapse
604'
1,975'
9,356'
9,110'-10,164'
Oil-Bbl
Representative Daily Average Production or Injection Data
Gas-Mcf W~ter-Bbl Casing Pressure
Tubing Pressure
Prior to well operation:
Subsequent to operation: This well was shut in prior to and subsequent to operations
14. Attachments: 15. Well Class after proposed work:
Copies of Logs and Surveys Run Exploratory D Development D
Daily Report of Well Operations 16. Well Status after proposed work:
'OirE]'~"" Gas D WAG D
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact
Printed Name P. M. Ayer
Service 0
GINJ D WINJ 0 WDSPL 0
Sundry Number or N/A if C.O. Exempt:
ï II 1$ 2004
Title Petroleum Engineer
Phone 263-7620
Signature
fl
Date 18-Feb-2004
Form 10-404 Revised 12/2003
FEB 2 7 1ÐB4'
8Ft
P~~lIIIt O.~~
Spud O~
Surfcc. LocCltlon:
Sub~urlocc Location:
E!avat!on:
1t>:
PBD:
ea.tng: .
PerforotJO~:
InitioI' Potentia!:
InttJaI StfmulctJon:
R...-votr Ckd~-
Cered Intervals:
DST Interval.
ond Rewtb~
Lot I".,."tmy.
Short Strfng:
A. ;) 1/2" ButtrÞa pup Jts
B. :) 112" N-80 8uttru8 tubing
C. SoQr UockJ ~ s.atfng Nfpp!e
O. 3 1.1r Buttran pup it
E. 2 718" Y.O GI'Icf 3 112" Buttreu V(/cOllar
f". 2. 7~" N-8f1 pup ]t
'*
(As nut ~---_._.-..- --_.' '--'--,
'.' //u' ,?3.,
~ '731-97:58', cut 19'. rec:avwed 11'; 2) 8758-t783',' cut 25.. rec0Y8red 2305' //¡/¿ r,t¡-tG'ø 9~?..1 ,-,/.ri.,(t':#'t_-~
3 8850-8890", cut 40'. NCG\r8Nd 40':.) 88So-a902'. cut 12.. recoYUU 10.5" ; /... <12,,"- --- .__0---'"
5 91101.-9821', cut 19', ~ 18.5'; I) 9S21-9948', cut 27" n:COY8Rd 25. ~~"/ .) .. ,J__'_~_h'''-
"-t8-8876", cut 2r. ~ 28': 8~ 11976-"96'. cut 20., na~red 14' ~-_..-' -/_,
51 8991-10002', cut 8'. r'8CCVeNd S': 10 10002-42'. cut .w, recovered 39.S' r¡~¡" 8 I
1 1 l' 0042-5-4', cut 12'. rwoavered T: 12 10054-58', cut 4', recover.d 2...5' " e qq 3
13 10058-87", cut 29', NCCV8Nd 29': 14) 10081-99', cut 1:r. re, covered S' / ,., ,,-f
15 10099-128". cut 27". reCOY8nld 2Ø' (2' of prriOU8 cor.) / f-..J ¡/~L.l '; .
18 10'28-38'. cut. 12'. NCCN8I"8d 10.5': 17) 1Q1~8-ti,.. cut: 29", ~cS 25' / or- oc.-IJ>
18 10167-97". cut:serf I'8COVVed 30': 19) 10187-218', cut 19'. J"OCOII8red 18", ,;>.
20 10216-34', cut 18'. recovered 13.5': 21) 1023+-80', cut 26°. recovered 24' /
22 102:55-79', out 24'. rucw...d 22' /
',1 î- ~lY
'1 ;.~,: / )J.J -
:; '''', ' ,;;. .--,f"./
,) í,) 1..,.- '
SOUTH MIDDLE GROUND SHOAL
ADL 18746 WELl NO 1 1
HEMLOCK CONGlOlAERATE
PLATFORM DILLON
_~mpl.tlon R.cCl~-
-4/17/68
L.g 2, Slct 2. SUGS Platform DIJ:Ion
705' ~ 1874' FWL. Sea. 3S, raN. R13W
10 - ~7a' F'SL. 2.w5e' fW4 Se=. :S5. T!lN, R1 'JW
1 10' KB-I.ISL
'~O8' 1VO: 1017Q'
'032~' 'TW: 104t7"
20". 85 Ci."ld 8~ Ca.tng ..t crt' aos' with t 205 ax, cement
13 J.I8", $4.51 Caaln,9 Nt at 200" wtth 1800 Þ. cem.nt
9 518", ~ and 43.51 5-9S and N-80 Ccl8lng act at
9876" wltb " SO JX. cement .
-r'. 231 S-8~ Unv set crt 8429-10502' with 210 IX. cement
Long String:
1. Tubtng Hanger
2. 3 1/2" Suttnsu pup.
3. ;) 1/'2" N-80 auttreaa tubing
4. Bcker J.Iodel 'P SeatIng Ntppt.
S. 27/818 Butt. \CO x 3 112"" Butt. XO w/collar
8. 27/8" Buttress pup
1. Bck... 194-D-'-80 Paraltel flowfMatI
8. Bcker 8" Sea! locator aub
9. Bc:1cer Seal AlMmbly
'\ O. 2 7/8" Buttraa pup
, 1. 2 71811 auttra. pup
, 2, Bck.,. Uo4el 'F" Seating NIpple
13. 2 7/P1' EUE XO x 2 718" pfn WI'cottar
, 4. Boker G-22 lOcator {tu",.d to (U c.d.)
15.' Bker Seal AaMmbI)'
16. ~ out sub
G-3B:
11920-10000'
10010-10030'
, ~0-1008O'
10090-10110"
1D140-10220"
10240-10310'
1 S73 SCPO. sa BWPO. 432 LfCFD
C--4:
Non.
Won.
1E.l./SP. BHCIGR (6120168); 4-Arm Clpmet.-. OR (7/10168): Or (1/17/68)
Trocw-Temperature (6I2J170): Tracar (3124/72)
Spfn".,. Tracer (8124173. 916/73): Tracer (r2/12/7J)
Tracer- T unperatur'8 (11/2/7 4): tracer- Shcrt String (J/6I80)
:>'pt..,
34'
48'
9272'
8273'
9306'
931 cr
9312'
9312"
9:324'
9357'
10104'
10105'
10,Oß'
10107'
10127'
10128'
51' 8-.
8288'
9271'
9307'
930e'
8310'
-' f!'
I": : i ..
PSTD 10J2S'
1D 10508'
j
2
A
l
J
B
20-' 8S &
Sil4f CSA.
80:S'
1 3 :118"'54.51
CSA 2001"
7" 231 liner
Top at 9429'
14
1
DILLON PLATFORM
API # 50-733-201 04-00
S. MGS UNIT # 11
WELL HISTORY
Well #11
DATE COMPLETED
EVENT
1968
8/26
1969
12/21
1972
7/21
1973
6/29
12/21
1974
8/16
1975
12/10
1977
10/4
1980
9/15
1982
6/29
Completed as an Oil Well.
Completed as a Water Injection Well.
Perf, Clean out, Acidize, perf
Supplement Cement squeeze
Repair tubing leak
Repai r/squeeze/stimulation
Reperf G3-B zone
Convert to dual injector
Remove junk in hole
Reperf
2002
12/10/2002 This well was shut in and isolated at the surface with multiple
flanges to isolate the well from surface flow lines.
Di-11 Hist 12-21-69.doc, last revised 2/18/2004
page 1
Don Sta
dual
LEG ROOM #1 2O"x 13 3/8" 13318" x 9 5/8. 9518" x 3 1/'Z'
1 bbIs 28 bbIs 22 bbIs
4 bbIs 15.5bb1s 30 bbIs
~
~
01- 13
LEG ROOM #2 E
01-18 20bbIs
01-17 15.5bbIs 20 bbls
01-16 15 bbIs 20bbIs
01-11 5 bbIs 7;4bbIs
01-8 25 bbIs
01-7
ABN-6
~
LEG ROOM #4
01" 5 -:= ¡abbls ~
01-3
12 bbIs 25 bbls
20 x 13 SI8 0.1815 300 54.45 31/2 tbg. 0.0087 300
185/8 x 13 3/8 0.1291 300 38.73 2 7/8 tbg. 0.00579 300
133/8 x 9 5/8 ,0.0671 300 20.13 I". 858 334
9 5/8 x dual31/2 0.0507 300 15.21 355
9 518 x dual 2 7/8 0.0571 300 17.13 pump limit 21 psi
9 5/8 x 3 1/2 0.0626 300 18.78
wen #2
welll4
wen #9
wen # 10
wen #13
wen #7
wen #8
Well #11
wen #16
wen 17
wen # 18
wen #3
wen #5
wen # 12
wen #14
wen #15
WELL BAY # 1
Pumped down tbg.tbg on vac, bled down 9 5/8 x tbg. Pumped 28 bbls. Gas still at sudace. Pumped down 20x 135/8 2bbb 100 psi. 20 bbls in 13 3/8, Try to pull eclipse paker with wire
line could not get out.
Well had 180 on annulus and ISO on tbg would not bleed down, Tryied pumping down short side old pump In hole could not pump. Put 30 bbls of 9.8 in annulur 9 5/8x tbg. Pumped
down I.s. tbg. Retumed up short side 100 bbIs. Put 15 bbls In 13 5/8x9 5/8. 4 bbls in 20" ann.
Hook up to 20" took approx 1 bbl with charge press on ann. 13 3.8}( ~ 5/8 RumP and bleed 3 bþ~s i~ an~. 9 5/8xtbg fluid packed with oil. 14.4 bblsin tbg.
well 10 is abondoned
Fill 20" ann 2 bbls, tbg on vac 7bbls in 13 3/8 x 9 5/8 28 bbls 9 5/8 x tbg. 5 1.5. 5 s.s.bbls down short side did tbg. And ann same time
WELL BAY # 2
20" fluid packed, 13 3/8 x 9 5/8 2 bbls and started getting diesel fluid back to sudace. Pumped Sbbls in tbg.' 20 bbls in 9 5/8 ann.Annulus and tbg. Have oil returns 0 press on well.
20" fluid packed,13 3/8 x 9 5/8 2 bbls and started getting diesel fluid back to surface. Pumped Sbbls in tbg.' 20 bbls in 9 5/8 ann.Annulus and tbg.
Press up to SOO psi. on both tbg. Strings had oil to top no press on tbg. Pumped and bled 7bbls in tbg. Annulus. When annulus was fluid packed. Oil at sudace.5 bbls In 13518 x 9 5/8
press limit. .5 bbls in 20"
Well had SOpsf. On 13 3/8x 9 5/8 bleed down to 20psi put bbls of 9.8 fluid, 95/8onn. 20 bbls fluid, tbg.5bbls each, wells 185/8 has 110 psi. bled off and fluid packed with press limit of
50 psi..75 of a bbl.
Well had loopsi. On 13 3/8x 9 5/8 bleed down to 20psf put TSbbIs of 9.8 fluid, 95/8onn. 20 bbls fluid, tbg.5bbls each, wells 185/8 has 60 psi. bled off and fluid packed ann with .75
bbls.
Well had 150psi. On 13 3/8x 9 5/8 bleed down to 20psi put 2Obb1s of 9.8 fluid, 95/8onn. 20 bbls fluid, tbg.5bb1s each, wells 185/8 has25 psi bled off and fluid packed with 9.8 san took
1.2 bbls.
WELL BAY # 4
Rig up pump 4 bbls I.s. 4 bbl 5.5. 9 5/8 x tbg. 25 bbls, 13318 x 9518 fluid packed wI 12 bbls, 20" ann. 2 bbls. Fluid packed
Pumped 4 bbls I.s. tbg. 4 bblss.s.R¡u to 9 5/8 x 3 1/2 ann. Pumped 15 bbls fluid packed oil to sudace.
Pumped 4bbls down tbg Is, 4 bbls s.s. both went on vac. Pumped 15 bbls 95/8 x31/2. WIfh50 psi press limit 0 bbls in 13 3/8x 95/8
Fluid packed 20x 133/8 2 bbls, Auld packed 13 3/8x9 5/8 12 bbls press up to 200 psi and held.
Rig up pump 5 bbls 1.5. 25 bbl s.s. & 9 5/8 x tbg. 8 bbls fluid packed 011 to surface 13 5/8x9 5/8, RIU to 20" ann fluid pack 5 bbls. Press limit 20 psi.
Unocal Corporation
P.O. Box 196247
Anchorage, AK 99501
Telephone (907) 263-7805
UNOCAL )
-Alaska
June 25, 2002 0RIGIN~tL
State of Alaska
Alaska Oll and Gas Conservation Commission
333 W 7th Ave # 100
Anchorage, Alaska 99501-3539
Attn: Tom Maunder
Re: South Middle Ground Shoals Dillon - 11
Dear Mr. Maunder:
A temperature survey was run on 5/3/02 which demonstrates that Dillon -11 (Permit # 1680320, S
MGS 18746-11) is in static equilibrium and is not flowing.
The Dillon 11 has been shut in since 1987, when tubing-to-casing communication developed. The
long string is unusable because of wire and wireline tools lost in the hole beginning at a depth of
approximately 1,500'. The temperature survey was run in the short string, but bacterial sludge
buildup over the years prevented access below 8,000' (7,581 TVDSS). Attached is a plot of the
temperature data versus depth. The data shows a smoothly varying temperature gradient from
near surface to 8,000'. From 8,000' to the packer at 9,312' are the Tyonek B,C,D,E and F sands,
which are wet, non-producing sands in the Dillon area. We conclude that the well is in static
equilibrium above the production reservoirs and presents no danger to any fresh water aquifers or
shallower reservoirs. We have also attached the well schematic.
The water flood system on the Dillon Platform has been disassembled and we are not currently
planning to resume further injection on this platform.
Enclosed is a 10-403 for your approval. If you have any questions regarding this, please contact
myself at 263-7807 or Hal Martin at 263-7675.
Enclosures
Sincerely,
Jeffery J Dolan
Waterflood Technician
Cook Inlet Waterflood Management
Aogcc SMGS Dillon - 11 Apphcat]on for SI MIT rev 1 doc jjd
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
I Type of Request Abandon Suspend Operabon shutdown Re-enter suspended well
Alter casing Repmr well Plugging T~me extension Sbmulate
Change approved program Pull tubing Vanance X Perforate Other
2 Name of Operator 5 Type of well 6 Datum elevation (DF or KB)
Union Oil Company of California (Unocal) Development 100' KB ABOVE MSL feet
3 Address Exploratory 7 Unit or Property name
Strabgraph~c
PO BOX 190247 ANC, AK. 99519 Service X South Middle Ground Shoal
4 Location of well at surface 8 Well number
699' FSL, 1872' FWL, Sec. 35-T8N-R13W-SM No. 11
At top of producbve ~nterval 9 Permit number
2512' FSL, 2537' FWL, Sec. 35-T8N-R13W-SM 68-32
At effecbve depth 10 APl number
2560' FSL, 2482' FWL, Sec. 35-T8N-R13W-SM 50-733-20104-00
At total depth 11 F~eld/Pool
2578' FSL, 2466' FWL, Sec. 35-T8N-R13W-SM Middle Ground Shoal/"G"
12 Present well cond~bon summary
Total depth measured 10,508' feet Plugs (measured) 10,325'
true vertical 10,170' feet 10,417'
Effective depth measured 10,325' feet Junk (measured) None
true verbcal 9,996' feet
Casing Length S~ze Cemented Measured depth True verbcal depth
Structural
Conductor 605' 20" 1205 sx 605' 604'
Surface 2501' 13-318" 1600 sx 2001' 1975'
Intermediate
Producbon 9676' 9-518" 1150 sx 9676' 9356'
L,ner 1073' 7" 210sx 9429-10502'
Perforation depth measured
(See Attached Wellbore Schematic)
true vertical JUL 01 2002
Tubing (s~ze, grade, and measured depth) 3 112" N-80 Dual to 9272'
2 718" N-80 Single to 10128' AlaCk8 0il & Gas Cons
Packers and SSSV (type and measured depth) BakerMod. 'Fl' ~ 9320' Anchora~.
BakerMod. 'Fl' ~ 10120'
13 Attachements Descnpbon summary of proposal Detaded operabons program BOP sketch
Well bore schemabc Temperature Survey
14 Esbmated date for commencing operabon 15 Status of well class~ficabon as
16 If proposal well verbally approved Od Gas Suspended
Name of approver Date approved Service X
17 I hereby certify th.,,at-t~orego~ng ~s true and correct to the best of my knowledge
S~gned T~tle Water flood techmc~an Date 6/25/2002
FOR COMMISSION USE ONLY
Conditions OfPlugapproval, ntegntyNot,fy CommlsslOnBopSO representatlVeTest may wltneSSLocatlon clearance~ IApproval No ,~1~-- C:~
'~-Mechamcal Integrity Test ~_ Subsequent form reqmred 10-
Ong~nal S~gned By
Approved by order of the Commissioner Comm~sstoner Date
Form 10-403 Rev 06/15/88
ORIGINAL
i
SUBMIT IN TRIPLICATE
Dillon 11 Temperature Survey- May 3 2002
Temp F.
20 40 60 80 1 O0 120
140
160
1000
2OOO
3000
4000
5000
600O
7000
8000
9000
~-~ Temperature
Ob~,truction
8,000'
Packer 9,320'
6/25/2002 9:31 AM Jeff Dolan Dillsqt.20020503.xls Log Run
Spud D.~'e:
Sur~c~ toc~lom
C~$In~:
perfofatlonm
tnltlal Sttmutatlm:
DST h~m~mtB
and R~rdl~
SOUTH MIDDLE GROUND SHOAL
ADL 1874.6 WELL NO 11
HEMLOCK CONGLOUERATE
PLATFORM DIL.t. ON
_C?mpleUon Record
1..ag 2, $lcL. 2, SMGS Platform
705' ~ 1874' ~ ~, 35, ~, RI~
10'
10325' ~: 10417'
20", ~ ~d ~ ~ ~t ~ e05' ~ 1205 ~.
7'. 23~ ~85 ~r ~t ~ 9429-10~2' ~I~ 210 ~.
1~01~I~
1~9~I011~
~4: 1014~1~2~
15,"3 B(~. O B~D. ~2 LICK)
N(xle
Long String: ~pt~
1. Tubing Hangs' 34'
· . 3 1/2" guttr.~ pupe ~'
3. 3 1~" N-80 g~o ~g 0272'
4. g~ ~ '~ ~g ~ 9273'
6. 27~" ~~ 931~
7. ~ 19~60 Pa~eI tie. ad 9312'
8. ~k~ 8" ~ I~ ~b g312'
9. ~ ~ ~~ 9324'
10. 2 7,~" b p~ ~
11. 2 7~" ~ ~ 10104'
12. B~ M~ '~ ha~g ~h 10105'
1~, 2 7~' ~E XO x 2 7~" ~ ~'~l~r 101~'
14. B~ ~22 ~c~r (~d ~ 4" o.d.) 10107'
15. ~ ~ ~ 10127'
16. ~r o~ ~ t 0128'
~ous-~o~. ~ s.. ~d ~: lo) ~0~2-42'. ~ ~. ~ 30.5
1) 1G~2--~, ~ 12, ~d 7': 12)_ ~5~58'. ~ 4', ~ ~'
~~~3 1G~, Q~ 2~,.~d 29': 1~) 100B7-99', ~ 12', ~c~ G'
18 10~87-G~, ~ ~, ~d ~'; 18) .~01G7-2~8', ~ 10', ~d ~r
~Tr, ~ 24% ~d 22'
IlS
Short Stag:
A. 3 1/2" But'minG pup Jt.s
B. 3 1/2- N-a0 Buttruo tub~g 92eo.
c. i~.r Mod~d 'r' So(ring Mpp~e 027'~'
D. 3, 1/2' Buttruoo pup .It 0307'
F. 2 7/B** ~0 a~l 3 1/2'* Buttre~ w/'collor 9308'
F'. '2 7/B" ~-$~ pup ]% 9310'
?~ .....
~ 10325'
10508'
L
20" 8~ &
o4,JJ csA
~05'
~SA 2001'
7'. 2Ns Uflr
Top at 0429'
43.fl~ CSA 9~76'
0020'
10110'
10140'
10310'
MGS DILLON 1 1
10C
8(
40
2£
0
1000 ~,
100
10
Water Cut
Oil Rate PD/f %bbl/d
Gas Rate PD/( Mcf/d
Water Rate PUli bbl/d
Gas / Oil Rat :f/bt
10:
10
1968 69 70
10
-- Gas Inj Rate (CD) ( Mcf/d )
8
MGS DILLON 11
21
5OOO
4000 ! j
Water Inj Rate (CD) ( bbl/d )
3000 I
2000
1000 J
1968 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87
MGS DILLON
Platform
Well Pad
Alias
PTDNO
DATE
Days
On
Prod
011
Rate
(PD)
bbl/d
Cum
Oil
Prod
Mbbl
Days
On
WaterIn]
Dally
Win]
Rate
bbl/d
Cum
Water
In]
Mbbl
MGS DILLON
_
MGS DILLON
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
MGS DILLON
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
19680831
19680930
19681031
19681130
19681231
19690131
19690228
19690331
19690430
19690531
19690630
19690731
19690831
19690930
19691031
19691130
19691231
19700131
19700228
19700331
19700430
19700531
19700630
19700731
19700831
19700930
19701031
19701130
19701231
19710131
19710228
19710331
19710430
19710531
19710630
19710731
19710831
19710930
19711031
19711130
19711231
19720131
19720229
19720331
19720430
19720531
19720630
19720731
19720831
19720930
19721031
19721130
19721231
19730131
19730228
19730331
19730430
19730531
8
28
31
30
31
30
28
31
29
31
29
29
31
28
.
.
.
.
.
.
.
.
.
1220
411
630
641
541
633
741
617
573
526
512
332
463
482
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
10
21
41
60
77
96
117
136
152
169
183
193
207
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
7
31
28
31
30
31
30
31
31
30
25
30
31
31
28
31
3O
31
3O
8
7
31
30
30
31
29
31
18
31
30
30
31
27
31
30
31
31
24
31
30
29
3365
4009
3158
4547
4804
4976
4778
4489
4973
4924
1302
1459
1606
1271
1172
1427
1732
1006
916
1855
.
2222
3454
4267
2407
3380
3821
3796
2119
3022
3426
2985
2883
2851
3291
3832
3452
2976
2570
2655
2419
2337
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
24
148
236
377
521
676
819
958
1112
1260
1293
1336
1386
1426
1458
1503
1555
1586
1613
1628
1628
1644
1751
1879
1951
2056
2167
2284
2322
2416
2519
2608
2698
2775
2877
2992
3099
3191
3253
3335
3407
3475
Page 1
MGS DILLON
_
Platform
Well Pad
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
MGS DILLON
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS--DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
Allas
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
PTDNO
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
DATE
.....
19730731
19730831
19730930
19731031
19731130
19731231
19740131
19740228
19740331
19740430
19740531
19740630
19740731
19740831
19740930
19741031
19741130
19741231
19750131
19750228
19750331
19750430
19750531
19750630
19750731
19750831
19750930
19751031
19751130
19751231
19760131
19760229
19760331
19760430
19760531
19760630
19760731
19760831
19760930
19761031
19761130
19761231
19770131
19770228
19770331
19770430
19770531
19770630
19770731
19770831
19770930
19771031
19771130
19771231
19780131
19780228
19780331
19780430
Days
On
Prod
Oll
Rate
(PD)
bbl/d
Cum
Oil
Prod
Mbbl
Days
On
WaterIn]
Dally
Win]
Rate
bbl/d
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
31
31
30
31
30
13
.
9
.
.
.
23
29
31
31
28
31
28
31
30
31
29
25
31
30
31
2
.
31
30
31
28
31
31
30
31
30
29
31
21
8
28
21
26
31
30
30
30
2
3
.
.
.
Ctun
Water
In3
Mbbl
4159
3328
4768
4332
3651
4109
.
2290
.
.
.
.
3525
3464
3403
3231
2428
2722
3406
3053
2805
2908
3037
2348
2863
2750
2808
1945
3247
3295
3395
3613
3061
3373
3483
3838
3594
3487
3715
3331
4164
3503
3736
3274
2803
2785
2886
3797
4486
92
.
.
.
.
3673
3776
3919
4054
4163
4217
4217
4237
4237
4237
4237
4237
4237
4237
4237
4318
4419
4524
4624
4692
4777
4872
4967
5051
5141
5229
5288
5377
5459
5546
5550
5550
5651
5750
5855
5956
6051
6155
6260
6379
6487
6588
6703
6773
6806
6904
6983
7068
7155
7238
7325
7439
7448
7448
7448
7448
7448
7448
Page 2
MGS DILLON
_
Platform
Well Pad
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
MGS--DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
Alzas
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
PTDNO
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
DATE
Days
On
Prod
0~1
Rate
(PD)
bbl/d
CL%m
Oll
Prod
Mbbl
Days
On
WaterIn3
Dally
Win]
Rate
bbl/d
19780630
19780731
19780831
19780930
19781031
19781130
19781231
19790131
19790228
19790331
19790430
19790531
19790630
19790731
19790831
19790930
19791031
19791130
19791231
19800131
19800229
19800331
19800430
19800531
19800630
19800731
19800831
19800930
19801031
19801130
19801231
19810131
19810228
19810331
19810430
19810531
19810630
19810731
19810831
19810930
19811031
19811130
19811231
19820131
19820228
19820331
19820430
19820531
19820630
19820731
19820831
19820930
19821031
19821130
19821231
19830131
19830228
19830331
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
221
8
29
30
31
29
31
28
26
29
27
27
30
31
31
25
29
30
26
31
29
29
30
31
30
30
31
29
28
13
.
31
28
31
30
31
30
31
31
23
31
30
31
31
26
31
30
31
29
28
28
30
31
30
31
31
28
29
777
1532
1737
1608
2430
2625
2160
2334
1874
2586
2621
3585
3514
3497
3593
3133
3637
3486
3700
3605
3663
3069
3164
3179
3180
3685
3678
3494
2993
.
384
1392
1680
1650
1465
1784
1842
1851
1821
2105
2208
2096
2340
2001
2089
2171
2147
2276
2596
2297
2606
2565
2568
2662
2807
2718
2991
Cum
Water
Inj
Mbbl
7448
7454
7499
7551
7601
7671
7753
7813
7874
7928
7998
8069
8176
8285
8394
8483
8574
8683
8774
8889
8993
9099
9191
9290
9385
9480
9595
9701
9799
9838
9838
9850
9889
9941
9990
10036
10089
10146
10204
10246
10311
10377
10442
10515
10567
10631
10697
10763
10829
10902
10966
11044
11124
11201
11283
11370
11447
11533
Page 3
MGS DILLON
Platform
Well Pad
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
MGS--DILLON
_
MGS DILLON
MGS--DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
MGS DILLON
_
MGS DILLON
_
MGS DILLON
MGS DILLON
MGS DILLON
_
Alzas
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
PTDNO
DATE
Days Ozl Cum Days
On Rate Ozl On
Prod (PD) Prod WaterIn]
bbl/d Mbbl
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
* * 221
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
1680320
19830531
19830630
19830731
19830831
19830930
19831031
19831130
19831231
19840131
19840229
19840331
19840430
19840531
19840630
19840731
19840831
19840930
19841031
19841130
19841231
19850131
19850228
19850331
19850430
19850531
19850630
19850731
19850831
19850930
19851031
19851130
19851231
19860131
19860228
19860331
19860430
19860531
19860630
19860731
19860831
19860930
19861031
19861130
19861231
19870131
19870228
19870331
19870430
19870531
Da~ly Cum
W~n] Water
Rate In]
bbl/d Mbbl
.........
31 3310 11740
30 3269 11838
30 3347 11939
31 3251 12039
30 3436 12142
31 3393 12248
28 3573 12348
30 2784 12431
31 2511 12509
29 1984 12567
31 2413 12641
30 1500 12686
31 2306 12758
30 2140 12822
31 2186 12890
31 1922 12949
29 1938 13006
31 2203 13074
30 2336 13144
31 2222 13213
31 2103 13278
24 1983 13326
31 2294 13397
30 1209 13433
29 1358 13472
30 1578 13520
31 1746 13574
31 1833 13631
30 1760 13684
31 1160 13719
30 1484 13764
31 2148 13831
31 2129 13897
28 2190 13958
31 2013 14020
30 2798 14104
31 2674 14187
30 2322 14257
31 2568 14336
31 2574 14416
25 2806 14486
26 3795 14585
29 4003 14701
26 3637 14796
28 3543 14895
27 3684 14994
31 2976 15087
30 3283 15185
12 3463 15227
Page 4
(
Unocal Corporation
909 West 9~ Avenue, P.O. Box 196247
Anchorage, Alaska 99519-6247
UNOCALe
December 11, 2001
Tom Maunder
State of Alaska
Alaska Oil and Gas Conservation
Commission
333 W 7th Ave # 100
Anchorage, Alaska 99501-3539
Re: Dillon Shut-in Injection Well, Di-ll
Dear Tom:
We are asking for a time extension until June 31, 2002 on the MIT for Well 11 while we
run temperature survey which is intended to demonstrate the well is in static equilibrium
and is not flowing.
We ran pressure tests (5/1/01) similar to the tests run in 1997 and obtained ambiguous
results. I believe a temperature survey will demonstrate this well's condition. I have
attached the pressure surveys, a schematic and 10-403 for your approval.
The water flood system on the Dillon Platform has been disassembled and we are not
currently planning to resume further injection on this platform.
Therefore we ask that you approve the 10-403 granting a time extension for this well.
Sincerely,
Christopher A. Ruff
Senior Reservoir Engineer
Cook Inlet Waterflood Management
RECEIVED
DEC 3 1 2001
\~k-Anchorage\Groups~OGCC\Correspondences\Aogcc Dillon - D1-11 Time Extension for Temp
Survey doc
car
· ' ( STATE OF ALASKA ('~ ,~ ~.L~~I ~~//~"~~ .~
ALASKA OIL AND GAS CONSERVATION COMMISSION~P(r~/ , iz.z~l~
APPLICATION FOR SUNDRY APPROVALS
I Type of Request Abandon Suspend. Operabon shutdown Re-enter suspended well
Alter casing Repair well Plugging T~me extension X Sbmulate
Chan~le approved pro~lrarr Pull tubing. Vanance Perforate ObSer
2 Name of Operate 5 Type of well 6 Datum elevabon (DF or KB
Union Oil Company of California {Unocal', Development 100' KB ABOVE MSL feet
3 Address Exploratory 7 Umt or Property name
Strabgraphm
PO BOX 190247 ANC, AK. 9951,~ Se~ce X South Middle Ground Shoal
4 Locabon of well at surface 8 Well number
699' FSI., 1872' FWL, Sec. 35-TSN-R13W-SIV No. 11
At top of producbve mterve 9 Permit numbe~
2512' FSI., 2537' FWL, Sec. 35-TSN-R13W-SIV 68-32
At effecbve deplf 10 APl numbel
2560' FSI., 2482' FWL, Sec. 35-T8N-R13W-SIV 50-733-2010400
At total deptl- 11 F~eld/Poo
2578' FSI_, 2466' FWL, Sec. 35-T8N-R13W-SIV Middle Ground Shoal/"G"
12 Present well cond~bon summar
Total depth measured 10,508' feel Plugs (measured', 10,325'
true verbca 10,170' feet 10,417'
Effecbve depth measured 10,325' feet Junk (measured', None
true vert~ca 9,996' feet
Casing Length S~ze Cementer Measured deptl' True verbcal deptl'
Structural
Conductor 605' 20" 1205 sx 605' 604'
Surface 2501' 13-318" 1600 sx 2001' 1975'
Intermediate
Producbon 9676' 9-518" 1150 sx 9676' 9356'
L~ner 1073' 7" 210 sx 9429-10502' 9110'-10164'
Perforabon depth measured
(See Attached Wellbore Schematic',
true vertlca
Tubing (raze, grade, and measured deptl' 3 1/2" N-80 Dual to 9272
2 718" N-80 Single to 10128
Packers and SSSV (type and measured deptl' BakerMod. 'Fl' @ 9320'
BakerMod, 'Fl' @ 10120
13 Attachement.~ Descnpbon summary of proposal X Detaded operabons prograrr BOP sketch
14 Esbmated date for commencing operabo 15 Status of well class~hcabon as
16 If proposal well verbally approve( Od Gas Suspended
Name of approver Date approved Service X
17 I hereby cerbfy tha~the, forego~n~g ~:~true and correct to the best of my knowled.(
S~gned T~tle Semor Reservoir En~l~nee Date 12/20/2001
"'"' ' FOR COMMISSION USE ONLY
Cond,t, ons of approval Notify Commlss,on so representative may witness IApproval No ~,~0
Plug ~nteg nty~ BOP Test Locabon clearance /',
Mechamcal Integnty Test Subse...quent form required 10- ~ - - -
Original Signed By
Oechsli
Approved by order of the Comm,ss,oner Cammy Comm,ss, oner Date ...~/~'7
Form 10-403 Rev 06/15/88
RECEIVED
DEC 3 1 2001
Alaska 0il & Gas Cons. Commission
A~chorage
SUBMIT IN TRIPLICATE
SOUTH UIODLE OROUND SHOAL
ADL 1874.6 ~ NO 11
HBULOCK CONOLOMF. RATE
PLATFORM DILLON
4./q 7/8B
Leg 2, Slet 2. ~ Platfon~ DWon
TD -- 257B' PSt.. 2488' rWl.. Sen. 3~, TBN, RI 3W
110' KB--USL
1QSGS' TVO~
10325' I~/D: 104~ 7'
~, ~ ~85 ~ ~ ~ 942~-10~2' ~ 210 ~.
~ ~2~1~
1~1~1~
1~1011~
~4: 101~1~
1573 BC~D, g BWPD, 4~2 LK:FD
Non4
~C~). repletion Record
Long String: ~pth
1. Tlublng Hanger 34'
~. 3 I/2" Buttr. l~ pup~ 48'
4. B~ ~ ~ ~g ~ 9273'
S. 2 7~
7. ~k~ 19~e0 Po~I flo~ad g312'
8. ~k~ ~ ~ I~ ~ g312'
9. ~ ~ ~~ 9224'
10. 2
11. 2 7~' ~ ~ 10104'
12. B~ M~ ~ ~o~g ~le 101~'
13. 2 7~'
14. ~ ~22 ~e~r (~d h 4' o.d.) I010~
15. ~ ~ ~ 1012~
le. ~ ~ ~ 10128'
uu44-~u?r_._ out 2~_.. ~ 2r: 8) IgTS-~gr. L. ut 20'. reom~md 14'
~1~ ~__~u~_?_o~_', ~ 1_~_, reoavw~ 7: 12}_ 10054-S8', ,ut 4: reeova~ ~.~' //
13 1OOiB--B7', cut 2~', rMWvffml 29': 1.4) I0087-g9', cut 12,
18 10187--07', aut 30, memvamd 30';, 1~) .10197-21~', cut 19; reooveNd lB'
10218--~4', out 18', flaevmfsd 13..S'~ 21] 1~80', mJt 2~', r~c~vered 24'
10~q5-71; ,ut 24'. ~wered 22'
..,.
/2/'.2 ,
_~plrm,r_'rm=,r (e/2~. ~/~7~. ); rro~
,rm:~r-.T~ntmratur, (1't/2/74.)~ ~Shcrt Stdng
~ 3 1/2" B,,t~ pup ~ ~1'
B. 3 1/2" I,,t-80 Buttr.e.~ t,.,dd.g 0289'
C. Boker Mod~d 'F' Sooting 1,4fp~e 9271'
O. 3 1/2" Buttr8oo pup ,It g307'
F.. 2 7,/8" ~0 and 3 1,/'2" Bu~ w/collar 9308'
F. 2 ?/~" H-SO pup Jt 9310'
al,, lis .......... --
PBTD 1O325'
'IT) 1O508'
20' 85 &
CSA 2001'
7" 2NI UMr
Top a~ 9429'
4:~..~F cs,
10110'
I0140'
10~I0'
HFtY 13 '81
·
P.4
Proced.u.~ for MIT on Dillon_Di.11 Shut-in Iniector
!
,
1. Record daily tubing, casing, and outer casing pressures for a consecutive
three day period.
,
Increase casing pressure by 200 ~si. Continue recording daily tubing, casing.
and out~- casiIt$.,pressures [or an additional, consecutive, four-~ay period.
·
D~te Tubing. Pressure Casing Pre.ute Outer Casing Pressure
C~ z.. ]j ~,,,,'/11~ ~.~i~, -,5'~ ~ ~ - ~ ~ '
; ,
Spud
Sub~uHoc'~ Locotlon:
perfomtlon.:
InlUal PotenfJM:
tnttlai S~mulo~Jom
_R_e~wolr Do~o:.
Cemd Intewals:
SOUTH MIDDLE OROUND SHOAL
ADL 187¢6 WELL NO 11
HEMLOCK CONGLOMERATE
PLATFORM DILLON
4/1 7/68
leg 2, $1e~ 2. SU(~ Pleffon~ Dtiton
705' ~ 1874' ~ ~. 35, ~ R13W
~ - 257a' ~ 2466' ~. ~0. 35, ~N, RI 3W
110' KB--IdSL
10508' 1M:): 10170'
10325' 'rVD: 10417'
20", 85 and 9_4~1 Caring
13 ~". 54.5~ C~ng
9 ~", ~ ~d ~~95 and N--80 ~lng
9~76' ~ 1150 ~.
7'. 23~ ~95 M~r
~39: 9920-1~0'
1~9~10110'
1D14~1~0'
102~ 1 ~ 1
1573 BCPD. 9 B~I:'D. 432 UCI~
None
_O_o_ mple'don Record
Long $~,'lng: Depth
1. Tubing Hanger
P-,. 3 1/2" Buttree. pupe 48'
3. 3 1/2" N-BO Buttre# tubing 9272'
4. B~ker ldodel 'F' scoring Nipple 9273'
5. 2 7/B" Butt. XO x 3 1/2" ~ XO w/collar 9306*
8. 2 7/8" Buflz~ pup 9310'
7. Bakee 194--DA--80 Parallel tie,head
8. l~ker 6" Seal I~catm. tub 9352'
9. Beker Seal A~embly 9324'
10. 2 7/~" ~ pup 9357'
11. 2 7/8" Bu~r..~ ~ 10104'
12. Baker Model' '~' 5e~tlng Nipple
13. 2 7/8" E'UE XO x 2 7/~" ~ ~,'~l.<zr
14,. B~k~r Q.-.22 Loc~ar (tumid ta ¢. o.d.) 10107'
15. B~ker ~ Ar~nb~y 10127'
16. S~ar out tub 10128'
51'
9289'
9271'
9307'
9308'
931 O'
run
I~ 1032~'
'1~ 105o8'
20' 85 &
~05'
CSA
LIn,r
9429'
10110'
10310'
/ ~///~_-
Procedure for MIT on Shut-in Dillon Injector D-11
,
Record daily Long & Short string tubing, casing, and outer casing pressures
for a consecutive three day period.
Increase casing pressure 100 psi. Continue recording daily tubing, casing,
and outer casing pressures for a consecutive four day period.
IWell #: ID-11
Tubing Pressure
Date LS SS Casing Pressure Outer Casing Pressure
12/15~97 0 0 0 36
12/16/97 0 0 0 36
12/17/97 0 0 0 36
12/18~97 0 0 120 40
12/19/97 0 0 75 40
12~20~97 0 0 72 40
12/21/97 0 0 70 40
Pressures Recorded By
DEO-C~-97 THU 17:54
UNO~' ~$SET G~S GRP
NO, 90~37874
P, 04/05
Procedure for MIT on Shut-in Dillon Iniector D-11
.
.
Record daily Long & Short string tubing, casing, and outer casing pressures
for a consecutive three day period.
Increase casing pressure 100 psi. Continue recording daily tubing, casing,
and outer casing pressures for a consecutive four day period.
Tubing Pressure ?~ ie / 3 ~ ~
Date LS SS Casing P ssure Outer Cas!ng Pressure
,,
_
1'
~ ,,
Pressures Recorded By:
I STATE OF ALASKA
A ,<A OIL AND GAS CONSERVATION COM _ .,ION
APPLICATION FOR SUNDRY APPROVALS
1 Type of Request Abandon __ Suspend __ Operabon shutdown Alter casing __ Repair well __ Plugging __
Change approved program __ Pull tubing __ Vanance __
2 Name of Operator J 5 Tvoe of Well
Union Oil Company of California (UNbent__
! Exploratory
3 Address ~w c~ (:[ ~ '~ c~- 6 ~t~raph~c
P.O. BOX 196247, Anch. , ~', Jl~J Sew.ce
/
Re-enter suspended well __
Time extension __ Sbm ulate __
Perforate __ Other.
6 Datum elevate9 (l~r I~,.~T,
7 Unit or Prej~jl~a~it
4 Locat.on of well at sudace Leg #2, Slot 2, Platform Dillon
699' FSL, 1872' FWL, Sec. 35, T8N, R13W, SM
At top of producbve ~nterval
2512' FSL, 2537' FWL, Sec. 35, T8N, R13W, SM
At effecbve depth
2560' FSL, 2482' FWL, Sec. 35, T8N, R13W, SM
At total depth
2578' FSL, 2466 FWL, Sec. 35, T8N, R13W, SM
8 Well number
11
9 Permit number
68-32
10. APl number
50-- 733-20104
11 Reid/Pool
SMGS/Hemlock
feet
12 Present well condition summary
Total depth measured
true vertical
10508 ' feet Plugs (measured) 10,325 '
10170' feet 10,417'
Effechve depth measured
true vertical
10325' feet
9996 ' feet
Junk (measured)
Cas, ng Length S~ze
Structural
Conductor 5 6 4 ' 2 0"
Surface 1966 ' 13-3/8"
Intermediate
Production 9647 ' 9-5/8"
1073 ' 7"
Liner
Perforabon depth measured
true vertical
See
Cemen~d Measureddepth ~uevert,calde~h
1205 SX 605' 605'
1600 SX 2001' 1975'
1150 SX 9676' 9356'
210 SX 9429'-10502' 9110'-10164'
attachment
Tubing (s~ze, grade, and measured depth)
Packers and SSSV (type and measured depth)
3-1/2", 9.2#, N-80, Dual @ 9272'
2-7/8", 6.5#, N-80, Single @ 10,128'
Baker Model F-1 @ 9,320'
Baker Model F-1 @ 10,120' ECEIV£D
13 Attachments
Descnpt~on summary of proposal __
14. Estimated date for commencing operation
October 281 1991
16. If proposal was verbally approved
Name of approver
Date approved
Detaded operations program
BOP sketch __
DEC - 9 1991
15 Status of well classtf,cahon as AIaska 0ii & Gas Cons. C0mrr
Od __ Gas __ Suspendec~7~ Anchorage
Service Y
'"17. I hereby certify,t4~t the foregoing is tru__e, and correct to the best of my knowledge.
S~gned '~.~Y~. BUSH Title REGIONAL DRILLING
MAN;a~ER
(J %_.3 FOR COMMISSION USEONLY
Conditions of apP~ov'al' Notify Commission so representative may witness
Plug mtegnty ~ BOP Test ~ Locabon clearance ~
Mechanical Integnty Test ~ Subsequent form required 10-
Approved by order of the Commissioner
ORIGINAL SIGNED BY
LOr~NtF C, RMITH
ssi0t~
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
~ Perforation Record' Platform Dillon
[South Middle Ground Shoal # 1 1
.,
".'.'....T...O~".'..-'...!! .... ~.o.~..o'...m. ".i[i ....... T.O.~".'.".i .... i~.'. ~.'0'~.o..~i'"'i iLC....on.d..~t!..o...n..
9920 10,000 9622 9702 Open
,.
10,010 ...10.:030 9712 9732 . .. Open
10,050 . 10,080 9751 9781 Open
10.090 10,110 = 9791 9811 Open
................................................... G...-....4.. Sand
......... M..e.a..s.d.'~'.'.d..Dep...t..h. .... ~..Tr.u..e~..v...ei~ii~i~b...~F..~ii~i~;~:.ser~{~::~
............. T~5i5 ....... ii ..... ~ftOi~ ..... ~! ..... TSI5 ........ !! ..... BS~m .... i! Condition
10,140 10,..220 ..... 9840 9919 .... Open ....
10,240 10,310 9938 ~ 0,007 Open
P._erUnent D.ata:
Spud Date:
Surface Location:
Subsurface LoBation:
Elevation:
TD:
PBD:
Cooing:
PerforaUonl:
Initial Potential:
Initial Stimulation:
]~_eeervolr Data:_
Cored Intervals:
DST Intervalo
and Reoulto:
Log Inventory=
SOUTH MIDDLE GROUND SHOAL
ADL 18746 WELL NO 11
HEMLOCK CONGLOMERATE
PLATFORM DILLON
4/17/"68
Leg 2, Slot 2, SIdGS Platform Dillon
705' FSI., 1874' FWL, Sec. 35, TBN, R13W
TI) - 2:570' FSI., 24ce' IrWL, See. 35, TaN. R13W
11 O' KB-IdSL
10508' 1¥D; 10170'
10320' 'rVD: 10417'
20", 85 end 04~ Cooing eot at 805' with 1205 ox. cement
13 3,/9", :54.:51ll Caoln~g Get at 2001' with 1800 ox. cement
g 5/B", 40 and 43.:5f S-OS and N-80 Caring oct at
g876' with 11S0 ex. cement
7". 23~1 S-G,5 Uner Get at 9429-10502' w!th 210 ex. cement
O- 3B: 0920-10000'
10010-10030'
100:50-10080'
I0000-10110'
G-4: 10140-10220'
10240-10310'
1573 BOPD, g BY,~=D, 432 UCF13
None
._~?mpletlon Record
Long String:
I. Tubing Hanger
8. 3 1/2" Buttmia pupa
3. 3 1/2" N-BO Buttrees tubing
`1. Baker Model 'ir. Seating Nipple
:5. 2 7/8" Butt. XO x 3 I/2" Butt. XO w/collar
6. 2 7/8" Buttreso pup
?. Baker l g,I--DA-60 Parallel flowhead
6. Baker 6" Seal Iocator aub
g. Baker Seal Aosembly
10. 2 7/1" Buttraos pup
11. 2 7/8" Buttraoo pup
12. Baker Idodel 'F' Seating Nipple
13. 2 7/8" EUE XO x 2 7/8" pln w,'c,o,!~ar
1,1. Baker 0--22 Locator (turned to 4 o.d.)
1:5. Baker Seal Aosembly
16. Shear out sub
Short String:
A. 3 1/2" Buttraso pup its
B. ;3 1/2" N-BO Buttreae tubing
C. Baker Model 'F' Seating Nipple
D. 3 1/2" Buttreeo pup Jt
E. 2 7/8" Y.O and 3 1/2" Buttress w/collar
F'. 2 7/8" N-80 pup Jt
i! 0730-075B*, cut lg', recovered lg*; 2
~ oa:5o-oo.o:, out 40:. recovered 40'; 4
0002-0021/cut lO.. rocMred 18.5';
0046-0076 ,, cut 28/recovered 28';
_ ggge-loo02, cut S, recovered 5*; 10
I 10042-54;, cut 12', recovered
13 10058-87.,cut 2g***recovered 2g';. 1
1000g-127. cut 27. recovered 2g (
18 10128-38, cut 12', recovered
18 10187-g7', cut :30** recovered 50*; 1
20 10218-34** cut 18', recovered
22 10255-79', out 24** recovered 22'
g75B-g783', cut 2:5'. recovered 23.5'
0800--0002% ,cut 12', ,recovered 10.5'
B) 9921-99,4..8. cut ,2,7. recovered 2:5.
gg?6-ggg8, cut 20, recovered 14'
10002-42', cut 40', recovered 29.5'
I0054-58', out 4', recovered 2.5'
.) lOOB7-gg', cut 12% recovered 9'
'7~)f previous ogre)
1013B-67', cut 20', reaoverad 25'
g 10197-216', Gut 10', recovered 19'
1) 10234--60', cut 26', moovered 24'
None
il~P. _BHC,/GR .(e/2 .o/Be); 4-_Arm Dlpm. eter, OR_ (7/10/68): Or (7/17/68)
cer'-Lempera, mre (6/23/70): Tracer (3/24/'/2)
nn,r..lraeer (.B/24~/._3, 0/8~_ 3); Traeer (12/12/73)
cer~-iemperature (11/2/74); Tracer-Short String (3/6/90)
run 1/1B/81)
Depth
34' ·
48'
9272'
0273'
9306'
931 O'
0312'
0312'
0324'
0357'
10104'
10105'
10106'
10107'
10127'
10128'
51' 8.
9200'
9271' j
9307'
0308'
0310'
14---
15'-
PBTD 10325'
113 10508'
[
20" 8~ &
m4~ csx-
605'
:_~.~~ 10110'
~10140'
10310'
/-////. / ~1'
7" 23dl Liner
LTop at g42g'
g :~B" 40 &
43.0f CSA gO7e'
South Middle Ground Shoal
ADL 18746 Well No. 11
Procedure for suspending and freeze protecting well:
1)
2)
3)
4)
5)
Run temperature survey from 9312' to surface.
Bullhead power oil down both strings to 100'. Both tubing strings will be protected
against freezing by power oil at this point.
Run hose to 100' inside 9 5/8" casing X tubing annulus. Circulate power oil into
9 5/8" casing X tubing annulus taking returns up hose. The 9 5/8" casing X tubing
annulus will be freeze protected at this point.
Install blind flanges on all wellhead outlets.
Install gauges on the tubing and 9 5/8" casing X tubing annulus.
RECEIVED
~ EO - 9 ~,991
Alaska Oil & Gas Cons, CommissiO~
Anchora(~e
Amoco Production Company
May 24, 1989
M. A. Golas
Anchorage, Alaska
File: KJO-209-WF
Workover Procedure
Middle Ground Shoal Well No. 11
Please perform the following workover for the above
mentioned well. The authorized gross cost is $50,000 and
should be charged to repair well expense. Also, fill out
the attached Acid Stimulation Quality Control checklist
and return to Denver, following the completion of the
workover procedure.
1. Circulate out the pump with a pump extension catcher.
Once the pump is in the catcher, circulate an
additional 125 barrels of power oil down the short
string and up the long string. The wellbore tubular
volumes are as follows:
Long string to bottomhole assembly: 53 barrels
Short string to bottomhole assembly: 62 barrels
2. Rig up a wireline and lubricator and pull standing
valve.
3. Pump in a dummy acidizing pump.
4. Mix 61 drums (3360 gallons) of Welchem Super A-Sol
with 840 gallons of 35% HCl. This is a 80% Super
A-Sol and 20% acid volume mixture resulting in a 7%
HC1 acid strength in the stimulation fluid. The acid
is to contain 5 gallons of inhibitor and 20 pounds of
citric acid sequestering agent. Test the strength of
the acid by titration. Circulate the tank thoroughly
before pumping the acid/A-Sol mixture.
5. Mix 70 barrels of fresh water with 140 pounds of
tetrasodium EDTA. Circulate the tank thorough~
before pumping the acid. ~V~D
Al~sl~ Oil & Gas Cons.
Anchorage
(
Page 2
6. Close the short string and leave the annulus on
choke.
7. Pump 100 barrels of the acid/A-sol mixture down the
long string. Do not exceed 1 BPM or 3000 psig.
8. Pump 70 barrels of the EDTA mixture. Do not exceed 1
BPM or 3000 psig.
9. Rig down service company.
10. Rig up wireline company and pull dummy acidizing
pump. Run standing valve into the hole. Rig down the
wireline company.
11. Pump in a jet pump with a 9A throat/nozzle
configuration and return the well to production.
12. Obtain the pH of the produced fluid when the well is
initially returned to production and hourly for the
first 6 hours the well is produced after the worker.
Continue to check the pH of the produced fluid every
six hours thereafter or until the pH is above 5. Send
these results to Tom Harting in Denver.
13. After the well has cleaned up, circulate out the jet
pump and install a piston pump.
89131DEN0069
cc: K. J. Overcash
R. J. Conner
J. A. Krein
K. F. Baun
R. L. Grainger
C. D. Geisert
D. J. Rhodes
R. W. Brooks
T. A. Harting
J. L. Hampton
Well File
Rrr..C J¥
Alaska Oil & Gas Cons. Commission
Anchorage
STATE OF ALASKA {
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1 Type of Request. Abandon__ Suspend __
Alter casing __ Repair well
Change approved program __
Operahon shutdown __ Re-enter suspended well __
Pluggmg __ Time exlenmon ~ Stimulate _Z._
Pull tubng __ Vanance ~ Perforate __ Other __
2 Name of Operator / 5 Type of Well
Amoco Product ion Company Development X__
Exploratory __
3 Address Strabgraph~c __
P.O. Box 800 Room 1846 Denver, CO 802 1 Serwce__
4 Location of well at sudace
699' FSL X 1872' FWL Sec. 35 T8N-R13W
At top of producbve interval
2512' FSL X 2537' FWL Sec. 35 T8N-R13W
At effecbve depth
2560' FSL X 2482' FWL Sec. 35-T8N-R13W
At total depth
2578' FSL X 2466' FWL Sec. 35-T8N-R13W
6. Datum elevahon (DF or KB)
100' KB
7. UnR or Property name
SMGS
8 Well number
11
9. Permit number
68-32
10. APl number
50-- 733-20104
11. Reid/Pool
Hemlock
feet
12. Present well cond~bon summary
Total depth: measured 10,508 '
true vertical 10,170 '
feet Plugs (measured)
feet
10,325'
10,417'
Effective depth, measured 10,3 25 '
true verbcal 9,996 '
feet Junk (measured)
feet
Casing Length
Structural
Conductor 605 '
Surface 2501 '
Intermediate
Production 9676 '
Liner 1073'
Perforabon depth: measured
true vedical
See
Tubng (raze, grade, and measured depth)
Packers and SSSV (type and measured depth)
Size
20"
13 3/8"
9 5/8"
7"
attached
Cemented
1205 sx
1600 sx
1150 sx
210 sx
Measureddepth
605'
2001'
9676'
9429'-10,502
1/2" N-80 Dual to 9272'
7/8" N-80 single to 10,128'
Baker Model F-1 @ 9320'
Baker Model F-1 @ 10120'
~ueved~caldepth
604'
1975'
9356'
9110' - 10,164
RECEIVED
'JUN 12 i989
Alaska.011 & Gas Cons, C0mr~lst
', N~ch0rage
13 Attachments Oescrlpbon summary of proposal _X_
Wellbore d-ia§ram
Detaded operabons program X_
BOP sketch __
14 Esbmated date for commencing operabon
Upon approval
16 tf proposal was verbally approved
Name of approver
Date approved
15. Status of well class~flcahon as
Oil ~ Gas __ Suspended __
Service
17. I hereby cedCy that the.f~egoing is true and correct to the best of my knowledge
S,gned ~~¥/~~ J T,tle Sr. admin. Supv.
/z/~- / '-j (' L. ,_~St En ~ FOR COMMISSION USE ONLY
Conditi~ of approval No~'i~y Comm~'ss~on so represenlaWe may w~tness
Plug ~ntegnty __ BOP Test __ Location clearance __
M echamcal lnteg,ty Test __
Approved by order of the Commission
Date 6/1/89
I Approval N o. f.._ ,~'~,
Subsequent form required 10- Co/-] '
~pproved CoPY
~'"", ' )- ./'2,~Returned
ORiGiNAl- SIGNED BY
IONNIE C SMITH Comm,ss, oner Date
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
011
P_.ertinent Data'..
Spud Date:
Surface location:
Submarface locafJon:
TD:
PBD:
Ca,lng:
Peflora~onm:
Initial Pof. entla):
InlUal Stimulation:
R..~e,ervplr. Data:
Cored Interval,:
DST Interval,
and
Lc)g [nventory~
MIDDLE GROUND SHOAL
ADL 17595 WELL NO. 11
KENAI ~ LOWER KENAI CONGLOMERATE
PLATFORM BAKER
5/14/87
Lag 1, Slot 4
1940' FNL. 543' ~ Sea 31. TgN, R12W. S.U.
~ -- 1892' ~ 847' ~ SEe 31. TgN,
7g' RK5
9543'
9428'
20", g4tl Ca,lng set at 822' wl~ 1345 sx cement
13 3/8", 54.5 and 81J Casing ,et at 2975' wt~ 31Z50 mx cement
9 5/8", 40 and 43.5~ Ca,lng ~et at 9541'; 1,t ,toga: 1300 mx
cement. 2nd ~tage: 7035' with 1000 ax cement
7", 2g~l User met. at 5712-9¢74' wlth 700 mc cement
A: 5840-5850' 6580--8590' EFQ: 7780-78D0' ·
5895-5905' 6645--6655' 7860-7920'
BCD: 8105-6115' fl760-6770' 7950-8035°
8180-6190' 6795- 6800' 8060-8070'
621 O- 6220' 8840- 8850' 8120-8140'
8255-6655' ~=0:7105--7115° 8170--8215'
8297--S307' 7145--7155' 8240--831 O'
8340--6350' 7415-7425' * 8350--8470'
6450--6480' 7440-7450' * 8505-a555'
6480-6490' 7680-7745' · 8815-8680'
6535-6545' 7750-7765' , 8685-8720'
A zone: 1048 BOPO. OOE 1969
BCD zones: 1515 50PD. OOR 388
EFO zonem: 82~ BOPD. P~)R 526
· Cement squeezed
Completion Record
long S~n9: Depth
I. Cameron 10" NO}J Dual tubing hanger 32'
2. 3 1/2" Buttre,e end 2 7/8" Buttr~,e XO 33'
3. 2 7/8" Buttres, N-SO 6.4~ tubing 9040'
4. 2 7/8" But+,m.. pup 9047'
5. 2 7/8" Buttres, and 2 7/8" 8RD XO 9048'
6. 2 7/8" 8RD pup g054'
7. Notional Type 'V' covlty 907.5'
B. 2 7/8" RUE 8RD tallplp~ 9106'
g. 2 7/8" Guided Muleahoe 9107'
Short String:
A. 3 1/2" Buttr~** N-80 g.2~ tubing 5547'
B. 3 1/2" Buttrey, and 2 :~/B" Buttr~m, XO 5548'
C. 2 3/8" ButLre,, N-BO 4.8~ tubing 9045'
D. 2 ~" Bu~e~, and 1 1/4" 10~ XO 9048'
~ I 1/4" lORD pup 9058'
8740-8770'
8800-8920°
89D5-8988o
8975-9000°
g020-g050'
run
EFO zones -- 8685--8898', B825-8834'
None
IF.S, Sonl~ and Dlpmef~r
RECEIVED
12
Alas~ Oil & Gas Con~ C0mmL~d0n
' ~chorage
I~D g428'
'iD g543'
W G. Smith
District Manager
Amoco Production Company
Post Office Box 100779
Anchorage, Alaska 99510
907-562-2147
March 13, 1987
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention' C. V. Chatterton, Chairman
File- FEW-O48-WF
Report of Sundry Well Operations
SMGS 18746 Well No. 11
Platform Dillon, Cook Inlet, Alaska
Attached for your records is a State Form 10-404 reporting the results of
a tubing/packer to annulus integrity test run on the subject well. This
well failed the State annulus test of November 25, 1986, and on
February 10, 1987, Amoco performed tests to demonstrate that there was
good integrity from the tubing to the annulus. The results of the test
were not conclusive, and on March 6, 1987, Amoco did additional testing
which indicated there was direct communication between the short string,
long string, and annulus. A State form 10-403 will be sent under separate
cover requesting approval to repair the well. Amoco proposes to keep the
well active until repairs are made.
Very truly yours,
./->.:
W. G. Smith
Di strict Manager
Attachments
JCB/dds
048/jcb
RECEIVED
MAR 2 0 [987
Alaska Oil & Gas Cons. Commission
Anchorage
Annulus Pressure Test
SMGS 18746 Well No. 11
February 10, 1987
Time
12:55
13:00
13:05
13:10
13:15
13:30
13:45
14:00
15:00
16:00
19:00
22:00
01:00
07:00
13:00
~ t
Short String Long String
Tubi nq Tubi nc~ Annul us
1,650 psi
1,600 psi 870 psi
0 1,650 1,600 870
5 Min 875 600 770
10 Min 750 400 700
15 Min 700 350 670
30 Min 650 300 640
45 Min 550 200 580
1 Hour 500 100' 550
2 Hours 360 25 460
3 Hours 360 0 460
6 Hours 200 0 360
9 Hours 150 0 325
12 Hours 100 0 300
18 Hours 100 0 300
24 Hours 100 0 300
Comments
S.S. Injecting at 1,777 BPD
L.S. Injecting at 2,502 BPD
Shut- i n wel 1
Annulus Pressure Test
SMGS 18746 Well No. 11
March 6, 1987
Time .~, t
12'45
12'55 0
13'00 5 Min
13'30 35 Min
14'00 1 Hr 5 Min.
14:30 1 Hr 35 Min
15'00 2 Hrs 5 Min
Short String
Tubin_q
1,500 psi.
1,500
950
60O
500
4OO
4OO
Long String
Tubinq
1,600 psi
1,600,
400
110
25
0
0
Annulus Comments
900 psi S.S. Shut-in since 02/27/87
L.S. Injecting @3,000 B~D
900 S.I. Long String
800
675
625
590
590
STATE OF ALASKA l
ALAS¢ OIL AND GAS CONSERVATION COM .SION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown ~ Stimulate [] Plugging [] Perforate [] Pull tubing ~
Alter Camng ~. Other []
2 Name of Operator 5
Amoco Production Comoanv
3 Address 6
P.0. Box 100779, Anchorage, Alaska 99510
4. Locahon of well at surface 7
699' FSL, 1872' FWL, Sec. 35, T8N, R13W
At top of produchve ~nterval
2512'FSL, 2537' FWL, Sec. 35, T8N, R13W
At effective depth
2560' FSL, 2482' FWL, Sec. 35, T8N, R13W
At total depth
2578' FSL, 2466' FWL, Sec. 35, T8N, R13W
Datum elevation (DF or KB)
100' KB
Umt or Property name
SMGS
Well number
8 Approval number
7-72
9 APl number
50-- 733-20104
10 Pool
Heml oc k
Feet
11. Present well condition summary
Total depth, measured '.~'0~508 feet
true vertical 10,170 feet
Effective depth measured 10,325 feet
true vertical 9,996 feet
Casing Length
Structural
Conductor 605 '
Surface 2,501 '
Intermediate
Production 9,676 '
Liner 1,073'
Perforation depth' measured
Plugs (measured)
Junk (measured)
S~ze Cemented
10,325 Feet
10,417 Feet
Measured depth
20" 1205 sx 605'
13 3/8" 1600 sx 2,001'
9 5/8" 1150 sx
7" 210 sx
9,676'
9,429' - 10,502'
(See Attached Perforation Record Page)
true vertical
3½" N-80 Dual to
2 7/.8" N-80 Single't021feet 927
Tubing (s~ze, grade and measured depth) 0,128 feet
True Verhcal depth
604'
1,975'
9,356'
9,110'-10,164'
Packers and SSSV (type and measured depth) Baker' Model F-1 at 9,320 feet
Baker Model F-1 at 107120
12 St,mulat,on or cement squeeze summaryK~
Intervals treated (measured)
MAR 2
Treatment descnphon including volumes used and hnal pressure
Alaska 0il & Gas Cons. Commission
An~hnr~IA
13
Representative Da~ly Average Produchon or Injechon Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation
4200 1650 870
Subsequent to operahon 3000 1600
14 Attachments
Da~ly Report of Well Operahons [] Cop~es of Logs and Surveys Run
15 I hereby certify that the foregoing ~s true and correct to the best of my knowledge ..._~1~ ~' -.,~...~ -.~,
Signed
Form 10-404 Rev 12-1-85
Submit ~n Duplicate
Annulus Pressure Test
SMGS 18746 Well No. 11
February 10, 1987
Time
12:55
13:00
13:05
13:10
13:15
13:30
13:45
14:00
15:00
16:00
19:00
22:00
01:00
07:00
13:00
~ t
Short String
Tubing
1,650 psi
Long String
Tubinq
1,600 psi
Annulus
870 psi
0 1,650 1,600 870
5 Min 875 600 770
10 Min 750 400 700
15 Min 700 350 670
30 Min 650 300 640
45 Min 550 200 580
I Hour 500 100 550
2 Hours 360 25 460
3 Hours 360 0 460
6 Hours 200 0 360
9 Hours 150 0 325
12 Hours 100 0 300
18 Hours 100 0 300
24 Hours 100 0 300
Comments
S.S. Injecting at 1,777 BPD
L.S. Injecting at 2,502 BPD
Shut- i n wel 1
Annulus Pressure Test
SMGS 18746 Well No. 11
March 6, 1987
Time
12'45
12'55 0
13'00 5 Min
13- 30 35 Mi n
14'00 1 Hr 5 Min
14:30 1 Hr 35 Min
15:00 2 Hrs 5 Min
Short String
Tubinq
1,500 psi
1,500
950
600
500
400
400
Long String
Tubinq
1,600 psi
1,600
400
110
25
0
0
Annulus Comments
900 psi S.S. Shut-in since 02/27/87
L.S. Injecting @3,000 BPD
900 S.I. Long String
800
675
625
590
590
Perforation Data Sheet
SMGS 18746 Well No. 11
Measured Depth
(Feet)
True Vertical Depth
(Feet)
9,920 - 10,000
10,010 - 10,030
10,050 - 10,080
10,090 - 10,110
10,140 - 10,220
10,240 - 10,310
9,598 - 9,678
9,786 - 9,816
9,727 - 9,756
9,766 - 9,786
9,815 - 9,894
9,913 - 9,982
Amoco Production Company
Post Off~ce Box 100779
Anchorage, Alaska 99510
907-562-2147
D~str~ct Manager
Alaska 0J~ and Gas Conse~va[~on Com~ssJon
300[ Po~cupJne D~Jve
File: FEW-O18-WF
Application for~Approval
SMGS 18746 Well~
Platform Dillon, Cook Inlet, Alaska
Attached for your approval is a State Form 10-403 for performing a
tubing/packer to annulus integrity test on the subject well. The well is
presently injecting and Amoco proposes to maintain injections into the well
if it passes the test.
Very truly yours,
W. G. Smith
District Manager
Attachments
JCB/dds
031/jcb
(, STATE OF ALASKA I~,
AL A OIL AND GAS CONSERVATION CO ,~ISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend [] Operat,on Shutdown [] Re-enter suspended well [] Alter casing E]
TIme extensmn ~ Change approved program [] Plugging [] Shmulate [] Pull tubing [] Amend order [] Perforate [] Other
2. Name_ of Operator
Amoco Production Company
3'AddrepS.So. BOX 100779, Anchorage, Alaska 99510
4. Location of well at surface
699' FSL, 1872' FWL, Sec. 35, T8N, R13W
At top of produchve ~nterval
2512' FSL, 2537' FWL, Sec. 35, T8N, R13W
At effective depth
2560' FSL, 2482' FWL, Sec. 35, T8N, R13W
At total depth
2578' FSL~ 2466' FWL~ Sec. 35~ TSN~ R13W
11 Present well condition summary
Total depth measured
true verhcal
10,508 feet
10,170 feet
Effechve depth measured 10,325 feet
true vertical 9,996 feet
5. Datum elevation (DF or KB)
100' (KB)
6. Unit_or Property name
SMGS
7. Well number
11
8. Permit number
68-32
9. APl number
50-- 7RR-?(ll ~4
10. Pool
Heml oc k
feet
Casing Length S~ze
Structural
Conductor 605' 20"
Surface 2,501' 13 3/8"
Intermediate
Production 9,676' 9 5/8"
L~ner 1,073' 7"
Plugs (measured)
Junk(measured)
10,325 feet
10,417 feet
Cemented Measured depth True Vertical depth
1205 sx 605' 604'
1600 sx 2,001' 1,975'
1150 sx 9,676' 9,356'
210 sx 9,429'-10,502 9,110-10,164'
Perforahon depth' measured
(See Attached Perforation Record Page)
true vertical
Tubing (s~ze, grade and measured depth)
3½" N-80 Duod to 9,272 feet
2 7/8" N-80 Single to 10,128 feet
Packers and SSSV (type and measured depth)
12.Attachments
RECEIVED
JA?-j 2 7 1 87
Alaska Oil & Gas C-ms. Commission
Baker Model F-1 at 9,320 feet Anchorage
Baker Model F-] at ]0:120 fePt
Descnphon summary of proposal ~ Detmled operahons programJ~ BOP sketch []
13 Eshmated date for commencing operahon
February 10, 1987
14 If proposal was verbally approved
Name of approver
Date approved
15. I hereby c~tif~j that t_,~,fore~;>ing is true.,~nd correct to the best of my knowledge
_~'/~"~ ,~,~..~ Title District Manager
Signed
Commission Use Only
Date 01/23/87
Conditions of approval
Approved by
Notify commission so representative may witness ! Approval No.
[] Plug integrity [] BOP Test [] Location clearance~
Approve,~ ap?
Returned
Commissioner
Subsequent Wor'~,~ Re~oz'te¢]
by order of )'
the commission Date
Submit i~-- "t rip'Jicate
Form 10-403 Rev 12-1-85
Perforation Data Sheet
SMGS 18746 No. 11
Measured DePth
(Feet)
9,920 - 10,000
10,010- 10,030
10,050- 10,080
10,090- 10,110
10,140 - 10,220
10,240- 10,310
True Vertical Depth
(Feet)'
9,598 - 9,678
9,786 - 9,816
9,727 - 9,756
9,766 - 9,786
9,815 - 9,894
9,913- 9,982
RECEIVED
JA~'J 2 ? !,907
Oil & Gas C-,ns. Oommission
Anchorage
Description Summary of Proposal
Amoco Production Company proposes to demonstrate good tubing/packer to
annulus integrity on SMGS 18746 Well No. 11. Referencing telecon between
Lonnie Smith and Jeff Blagg on January 20, 1987 and between Blair Wondzell
and Jeff Blagg on January 16 1987, and referencing our correspondence dated
January 2, 1987, File: FEW-O01-986.511, it is Amoco's understanding that
the AOGCC desires this testing in order to ensure that fluids injected are
confined to injection strata. The portion of aquifers beneath Cook Inlet
described by a one-quarter (1/4) mile area beyond and lying directly below
the South Middle Ground Shoal Field are exempt for Class II injection
activities by 40 CFR 147.102(b)(2)(B) and 20 AAC 25.440(c) and no fresh
water aquifers are effected by injection activities into Well No. 11.
/~t~oco proposes to demonstrate that there is no communication from the
bing to the annulus by shutting in the injections and monitoring the
pressure response of both the tubing and the annulus. If this information
is not conclusive, then pressure will be applied to the annulus and the
pressure response of the tubing will be measured. If the tests indicate
poor tubing/packer to annulus integrity, then Amoco will apply for approval
to continue injections until corrective action can take place.
Detailed Operations Pro~)ram
1. Record the injecting operating pressure on the tubing and the static
pressure on the annulus.
2. Shut in the injections down the tubing for a minimum of 24 hours and
monitor the tubing and casing pressure.
3. If the annulus pressure remains constant as the tubing pressure falls
off, good tubing/packer to annulus integrity will have been
demonstrated.
4. If the annulus pressure does not remain constant or if the tubing and
annulus equalize at the same pressure, then pressure will be applied
to the annulus and the tubing will be monitored. If the tubing does
not respond, good tubing/packer to annulus integrity will have been
demonstrated.
5. Return the well to injection.
L A Darsow
D~st.ct Supenntendent
April 2, 1981
Fi le: LAD-435-WF
( I
Amoco Production uompan?~,
Post Ofhce Box 779
Anchorage. Alaska 99510
907 - 272-8471
~ONFER: __
FtLF: -
Mr. Hoyle H. Hamilton, Commissioner
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
(~Subsequent Report_]of Repair Work
"'"'- ~e]l No. 11
Platform Dillon, Cook Inlet, Alaska
Attached in duplicate is our State of Alaska Form 10-403, Sundry Notices
and Reports on Wells, outlining the recent repair work. The work was
completed January 17, 1981, and the subject well operates as a dual
string water injection well.
Yours very truly,
L. A. Darsow
District Superintendent
Attachment
KEO/klt
STATE OF ALASKA ~
ALASKAL~L AND GAS CONSERVATION C ,vlMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL [] COMPLETED WELL rXI OTHER I-I
2 Name of Operator 7 Permit No
Amoco Production Company 68-32
3 Address 8 APl Number
P. 0. Box 779, Anchorage, Alaska 99510 5o- 7332010400
4 Location of Well
Leg 2, Slot 2, SMGS Platform Dillon
2578' FSL, 2466' FWL, Section 35, T8N, R13W, S.M.
5 Elevauon ~n feet (~nd~cate KB, DF, etc )
110' KB
Lease Demgnat,on and Ser,al No
SMGS 18746
12
9. Un,t or Lease Name
South Middle Ground Shoal
10. Well Number
ll
11 F,eld and Pool
South Middle Ground Shoal
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF:
(Submit m Tr,pl~cate) (Submit m Duplmate)
Perforate [] Alter Casing [] - Perforations ~ Altering Cas,ng I-'l
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made )~]] Other []
Pull Tubing [] Other [] Pulhng Tubing ~
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13 Describe Proposed or Completed Operations (Clearly state all perunent detads and g~ve pert,rent dates, ~nclud~ng estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
The following work was performed during the period December 21, 1980 to
January 17, 1981'
·
·
.
.
.
Pulled dual 3-1/2" tubing strings.
Removed junk at 10,312' MD.
Cement squeezed G-1 and G-2 zones, 9630-9670' MD and 9738-9805' MD,
respectively.
Cement squeezed casing leak at 2329' MD.
Reperforated G-3B and G-4 zones, 9920-10,110' MD and 10,140-10,310' HD,
respectively.
Reran dual tubing strings and returned well to water inject~D~,~t~,a-
14 I hereby certify that the foregoing ~s true and correct to the best of my knowledge
The space below for Commission uso
Date April 2. 1981
Conditions of Approval, ~f any
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10°403
Rev 7-1-80
Submit "lntent,ons" ,n Tr~phcate
and "Subsequent Reports" ~n Duphcate
L A Darsow
District Supenntendent
November 7, 1980
Fi 1 e' LAD-1148-WF
Mr. Hoyle H. Hamilton, Commissioner
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Amoco Production Company
Post Ofhce Box 779
Anchorage, Alaska 995,10
I
1 ,
/ 'I 1 EN~,..,',.
- I 2 EN~
~ 3 ENG
~ 4 ENG ~
~ 3
STAT TEC
STAT TEC
I
CONFER:
Dear Si r:
Notice of Intent to Perform Work
SMGS Unit Well No. ll
Platform Dillon, Cook Inlet, Alaska
Attached in triplicate for your approval is our State of Alaska Form
10-403, Sundry Notices and Reports on Wells. We intend to perform
repair and cement squeeze work on the subject well. The purpose of this
work is to cease injections into the G-2 zone and increase injections
into the G-3B and G-4 zones.
Yours very truly,
L. A. Darsow
District Superintendent
Attachment
KEO/klt NOV
AL STATE OF ALASKA (
ALASK ,L AND GAS CONSERVATION C . .MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL [] COMPLETED WELL I~ OTHER I-I
2 Name of Operator 7 Permit No.
Amoco Production Company 68-32
3 Address 8 APl Number
P. O. Box 779, Anchorage, Alaska 99510 50- 133-20104
4 Location of Well
Leg 2, Slot 2, SMGS Platform Dillon
2578' FSL, 2466' FWL, Section 35, T8N, R13W, S.M.
5 Elevat,on in feet (indicate KB, DF, etc )
110' KB
12
Lease Designation and Serial No
SMGS 18746
9. Umt or Lease Name
South Middle Ground Shoal
10. Well Number
11 Field and Pool
South Middle Ground Shoal
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF.
(Submit m Tnphcate) (Submit m Duplicate)
Perforate [] Alter Casing [] - Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well FX] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulhng Tubing []
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
Amoco plans to repair the subject well and cease injections in the
previously cement squeezed G-2 zone as follows'
·
2.
3.
4.
5.
Pull both strings of tubing and mill out packers.
Recover fish at 10,312' MD.
Cement squeeze the G-2 zone perforations (9755'-9805' MD).
Reperforate the G-3B and G-4 zones.
Return to dual injection with the long string injecting into the
G-4 zone and the short string injecting into the G-3B zone.
14 I hereby certify that the foregoing is true and correct to the best of my knowledge
S,gned ~..~C--~ ~"~~.~ .... T,tle District Superintendent
lhe space below for Commission us~
Date 11/7/80
Cond,tlons of Approval, if any ~
,.. By Order of
Approved by /' ~,~ COMMISSIONER the Commission Date
Form 10-403 ~ ~ Submit "lntent,ons" ~m Tr~phcate
Rev 7-1-80 and "Subsequent Reports" Im Duplicate
SCHLUMBERGER OFF'.-';.,HORE SER~'CES
( D,vls,on of Schlumberger L,m,ted ~, J~ P'.',
ous 'oN. .o
APRIL 9, 1980 .;..........o,,..o.,,,..,../~]~' ~,-
500 W INTERNATIONAL AIRPORT
ANCHORAGE' A~SKA 99502
STATE OF ALASKA ~ ~: 2c,'
ALASKA OIL AND GAS CONSERVATION COMMISSION
JO01 PORCUPINE DRIVE ANCHORAGE, ALASKA D9501 " /
AHention:
I
Gentlemen: 1 RFOLDED SEPI A - CONFE~
Common. AMOCO PRODUCT ION CO , Well SMGS 1 5, D-_3 D-4, D '8 RD
Field[ ~OUTH MIDDLE GROUND SHOAL,Coun~ KENAI grote. ALA~ '
Additional prints are being sent to:
prints
prints
. prints prints
prints prints
prints prints
The film is RETURNED TO AMOCO
We appreciate the privilege of serving you.
/./R E C E I VED
, DATE- ~.~4;/~'~
Ve~ truly yours,
SCHLUMBERGER OFFSHORE SERVIC~
[ ~r'ik,r~P9
DIST~ |~T &4A~AG~
D,v,s~on of Schlumberg:
_ ~ 3 EN ~ ~ce~sr REPLY TO
MARCH 26, 19~0
W. I NT~RNAT IONAL
AMOCO PRODUCTION COMPANY
P.O. BOX 779
ANCHORAGE, ALASKA 99501
Attention' RANDI ROSENBURG
1 ,'(,
_ I_COMM/ _
I COMNK.
__I-STAT
_ I STATTE.C
I
cONFER` ....
Gentlemen:
Enclosed orc=~ L 2 prints of the
Company AMOCO PRODUCT I ON , Well
Field SOUTH MIDDLE GROUND SHOAL .,County
ENGINEERED PRODUCTION LOG
SOUTH MIDDLE GROUND
KENAI
SHOAL ~11
State ALASKA
AIRPORT F
on:
Additional prints ore being sent to:
LB_L_prints
DIVISION PRODUCTION MANAGER
DENVER DIVISION
SECURITY LIFE BLDG.
DENVER, COLORADO 80202
~_~L__prints
CHEVRON U S.A. ; INC_
P.O. BOX ~ 839
ANCHORAGE, ALASKA
ATT -MR. KIRKVOLD
1 B L prints
DIVISION GEOLOGIST
SECURITY LIFE BLDG.
EX PLO IT AT ION
D:-NVER, COLORADO 80202
1 BL prints
GETTY OIL COMPANY
T_HREE PARK CENTRAL, SUITE 700
1_.515 ARAPAHOE ST.
DENVER, COLORADO 80202
1 B L nrints
DEPARTMENT OF NATURAL RESOURCES
DIVISION'OF OIL & GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501
ATT- HOYLE HAMILTON
1 B L prints
ATLANTIC RICHFIELD
P.O. BOX 360
COMPANY
ANCHORAGE, ALASKA 99501
The film is RETURNED TO AHOCO
DENVER
We appreciate the privilege of serving you.
1 B L prints
PHILLIPS PETROLEUM COMPANY
7800 EAST DORADO PLACE
ENGLEWOOD,.COLORADO 80111
ATT- MR. DENNY
prints
DATE
Very truly yours,
SCHLUMBERGER OFFSHORE SERVICES
DISTRICT MANAGER
L A Darsow
Area Superintendent
August 31, 1978
File: LAD-840-WF
Mr. Hoyle H. Hamilton
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Amoco Production Company
P 0 Box 779
Anchorage, Alaska 99510 --~
Dear Mr. Hamilton:
Subsequent Report of Workover
SMGS Unit Well No. 11
Platform Dillon~ Cook Inlet~ Alaska
Attached in duplicate is a Form l0-403 submitted as a subsequent report
of a workover conducted on SMGS Unit Well No. 11.
Yours very truly,
L. A. Darsow
Area Superintendent
RECEIVED
Attachments
WEN:sis
Divi~,ton of 0~1 and Gas Conservation
Forr~ ! 0-403
REV. 1-10-73
Submit "1 ntentlons" In Triplicate
& "SubseQuent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
0 n
WELLL.--] OTHER Water Injection Weii
NAME OF OPERATOR
AMOCO Production Company
5. APl NUMERICAL CODE
50-133-20104
6. LEASE DESIGNATION AND SERIAL NO.
ADL 18746
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
South M.iddle Ground Shoal Unit
3. ADDRESS OF OPERATOR 9. WELL NO.
P. O. Box 779, Anchorage, Alaska 99510 il
4. LOCATION OF WELL
At surface Leg 2, Slot 2, SMGS Platform Dillon
699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M.
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
110'- MSt KB
Check Appropriate Box To Indicate Nature of Notice, Re
14.
10. FIELD AND POOL, OR WILDCAT
South Middle Ground Shoal
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 35, T8N, R13W, S.M.
12. PERMIT NO.
68-32
3ort, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
PULL OR ALTER CASING
MULTI PLE COMPLETE
ABANDON*
CHA~IG E PLANS
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTER lNG CAS lNG
SNOOTING OR ACIDIZING ABANDONMENT*
(Other) Semre~ate Injection I~gerv. p~S
(NOTE: Report results of multiple completion on Well
Completion or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent cletalls, and give pertinent dates, including estimated date of
starting any proposed work.
SMGS Unit Well No. 11 was worked over from June 12, 1978 to July 7,1978 to cease
injections into the G-1 and G-2 zones of the Hemlock Conglomerate and segregate
injections into the G-3 and G-4 zones as follows:
Injection rate before workover:
1. Killed well with filtered Inlet water and pulled 3-1/2" tubing.
2. Drilled out permanent packer at 9365' and cleaned out to 10417' PBD.
3. Set bridge plug (closed retainer) at 10325'.
4. Tested for communication between G-3 and G-4 perle. No communication.
5. Squeezed G-2 perfs 9735-9805' with 300 ex.
6. Squeezed G-1 perle 9630-9670' with lO0 ex. ~
7. Set 7" permanent packer at 10116' between G-3 zone and G-4 zone.
8. Set 9-5/8" permanent packer at 9315'.
9. Ran dual tubing strings and returned well to injection.
4348 BWPD, 3640 psi (10-77)
Injection rate after workover: Short String (G-3 zone) 1532 BWPD, 3650 psi (8-28-78)
Long String (G-4 zone) 287 BWPD, 3650 psi (8-28-78)
16. I hereby certify that ~ing is true and correct
TITLE ,A_rea Superintendent
DATE AU~USt 31. ~978
(This space for State office use)
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY.'
TITLE DATE
See Instructions On Reverse Side
L A Darsow
Area Supenntendent
June 2, 1978
File: LAD-577-WF
Mr. O. K. Gilbreth, Director
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Amoco Production Compan'
P o Box 779
Anchorage, Alaska 99,510
Dear Sir:
Sundry Notice
SMGS Unit Well No. 11
Platform Dillon, Cook Inlet, Alaska
Attached in triplicate for your approval is a Form 10-403 for a proposed
workover on SMGS Unit Well No. 11 to shut off water injections into the
G-1 and G-2 zones and segregate G-3 and G-4 zone injections. This
sundry is a replacement for that submitted to you with our letter of
November 9, 1977, File: LAD-918-WF, for the referenced well.
Yours very truly,
L. A. Darsow
Area Superintendent
Attachments
WEN:klt
RECEIVED
JUN - 5 1978
D. vision of C,I ~nd C;a,s {;ons~,wetion
Anchora~
REV. 1-10-73
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
Submit "Iht.nil ,~.s" I. 1 flpllcale
& "Subsequent I ' ports" In Duplicate
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such 13roposals.)
WELLI--J OTHER Water Injection Well
NAME OF OPERATOR
Amoco Production Company
ADDRESS OF OPERATOR
P. O. Box 779, Anchorage, Alaska 99510
4. LOCATION OF WELL
At surface
Leg 2, Slot 2, SMGS Platform Dillon
699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M.
13. ELEVATIONS (Show whether DF, RT, GR, et~)
110' MSL KB
14.
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-133-20104
6. LEASE DESIGNATION AND SERIAL NO
ADL 18746
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
South Middle Ground Shoal Unit
9. WELL NO.
10 FIELD AND POOL, OR WILDCAT
South Middle Ground Shoal
11. SEC., T., R., M.. (BOTTOM HOLE OBJECTIVE)
Sec. 35, T8N, R13W, S.M.
12. PERMIT NO
68-32
)ort, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT.OFF [___] PULL OR ALTER CASING k___J
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT OR ACIDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other) Segregate in~ection intervals
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other) ,
(NOTE= Report results of multiple completion on Well
Coml31etlon or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent Gl.tails, and give pertinent dates, Including estimated date
starting any proposed work.
This proposed procedure replaces that proposed in Amoco Production Company's
Sundry Notice for the referenced well dated November 9, 1977.
Amoco proposes to cease injections into the watered-out G-1 and G-2 intervals
and segregate injections into the G-3 and G-4 intervals as follows:
.
Be
.
5.
6.
7.
Se
Pull tubing string and drill out permanent packer at 9365' MD.
Set permanent bridge plug at 10,330' MD to stop injections below
G-4 interval.
Test for communication between G-3 and G-4 intervals and squeeze if
communication present.
Squeeze G-2 perforations 9738-9805' MD with 100 sacks. !~ E C E I~ E D
Squeeze G-1 perforations 9630-9670' MD with 100 sacks.
Clean out to 10,330' MD. ~Ui~ ~ 5
Reperforate G-3 interval (9920-10,110' MD) and G-4 interval
(10,140-10,310'MD) as required.
Set single packer at 10,116' MD and dual packer at 9350' ~i~ el ~l ~,¢t Gas
A~h~a~
Run dual injection strings and initiate injections into the C-3
and G-4 intervals.
16. I hereby certify that the foregoing Is true and correct
TITLE Area Superintendent June 2 1978
DATE '
(This space for State office use)
CONDITIONS OF APPROVAL, IF AN~j~
Pet rD leum En Binee r
See Instructions On Reverse Side
DATE June 7, 1978
Copy
L A Darsow
Area Supermtenden!
November 9, 1977
File: LAD-918-WF
Mr. O. K. Gilbreth, Director
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Amoco Production Company
Anchorage, Alaska 99510
Dear Sir:
Notice of Intent to Perform Well Work
SMGS 18746 Well No. 11
Platform Di!lon~ Cook Inlet~ Alaska
Please find attached in triplicate for your approval our State F_~rm 10-403~.:
to perform injection profile improvement work on the subject wel~%~_~~~
purpose of this work is two fold: (1) reduce water cycling through the
more permeable G-1 and G-2 benches by restricting water injection volumes
into these pay intervals and (2) increase injections into the tighter
G-3 and G-4 benches by increasing the surface injection pressure for
these intervals. The anticipated starting date for this work is December 7,
1977.
Yours very truly,
L. A. Darsow
Area Superintendent
Attachment
JSD:klt
Form 10-403
REV. 1-10-73
Submit "intentions" In Triplicate [
& "Subsequent Reports" In Duplloa~
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT---" for such proposals.)
o,L F--1 GAs ~
WELLL-J WELL OTHER Water Injector
NAME OF OPERATOR
Amoco Production Company
5. APl NUMERICAL CODE
50-133-20104
LEASE DESIGNATION AND SERIAL NO.
ADL 18746
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
SMGS Unit
[ ADOR~SOFOPERATOR 9. WELL NO.
P. O. Box 779, Anchorage, Alaska 99510 11
4. LOCATION OF WELL
Atsurface Leg 2, Slot 2, SMGS Platform "D"
699' FSL, 1872' FWL, Sec. 35, T8N,
R13W, S.M.
13. ELEVATIONS (Show whether DF, RT, GR, et~)
ll0' MSL - KB
Check Appropriate Box To Indicate Nature of Notice, Re
14.
10. FIELD AND POOL, OR WILDCAT
South Middle Ground Shoal
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 35, T8N, R13W, S.M.
12. PERMIT NO.
68-32
)ort, or Other Data
NOTICE OF INTENTION TO*'
TEST WATER SHUT-OFF r'~ PULL OR ALTER CASING
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT OR AClDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other) Segregate injection intervals
SUBSEQUENT REPORT OF:
WATER SHUT-OFF : REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR AClDIZING ABANDONMENT*
(Other)
(NOTE= Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all I~ertlnent details, and give pertinent dates, Includ,ng estimated date of
starting any proposed work.
Operator proposes to segregate the G-1 and G-2 benches of the Lower
Kenai Conglomerate from the less permeable G-3 and G-4 benches as follows:
1. Pull present tubing (single string).
2. Recover present injection packer.
3. Clean to PBTD.
4. Test for behind-pipe communication between G-2 and G-3 intervals
and cement squeeze if necessary.
5. Install dual packers (one between G-2 and G-3 and one above G-&).
6. Run dual tubing strings with one string extending between
packers for injection into lower intervals (G-3 and G-4).
7. Return well to injection.
Anticipated starting date for this work is December 7, 1977. ~ ~
16. I I~ereby certify that tt~.~ re.~.~n_g Is true and correct
Area
DATE November 9, 1977
(This space for State office use)
· TITLE
CONDITIONS OF/A~PROVAL, IF ANY:
See Instructions On Reverse Side
Apl~m~d
Form 10-403
REV. 1-10-~,? 3
Submit "lntentlo,,," In Triplicate
& "Subsequent i:,'uports" In Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proPosals.)
OIL I---I GAs [~
WELLL.-J WELL OTHER Water Injector
NAME OF OPERATOR
Amoco ;Production Company
5. APl NUMERICAL CODE
50-133-20104
6. LEASE DESIGNATION AND SERIAL NO.
ADL 18746
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
SMGS Unit
ADDRESS OF OPERATOR 9. WELL NO.
P. O. Box 779, Anchorage, Alaska 99510 11
4. LOCATION OF WELL
At surface Leg 2, Slot 2, SMGS Platform "D"
699' FSL, 1872' FWL, Sec. 35, T8N,
R13W, S.M.
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
110' MSL - KB
Check Appropriate Box To Indicate Nature of Notice, Re
14.
10. FIELD AND POOL, OR WILDCAT
South Middle Ground Shoal
11. SEC., T., R., M., (BO~-TOM HOLE OBJECTIVE)
Sec. 35, T8N, R13W, S.M.
12. PERMIT NO.
68-32
~ort, or Other Data
NOTICE OF INTENTION TO:
TEST WA~ER SHUT-OFF ~ PULL OR ALTER CASING
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT OR ACIDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other) Segregate injection intervals
SUBSEQUENT REPORT OF
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
{NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, anti give pertinent dates, Including estimated date of
starting any proposed work.
Operator proposes to segregate the G-1 and G-2 benches of the Lower
Kenai Conglomerate from the less permeable G-3 and G-4 benches as follows:
le
2.
3.
4.
e
e
Anticipated starting date for this work is December 7, 1977.
Pull present tubing (single string).
Recover present injection packer.
Clean to PBTD.
Test for behind-pipe communication between G-2 and G-3 intelvals
and cement squeeze if necessary.
Install dual packers (one between G-2 and G-3 and one above G-l).
Run dual tubing strings with one gtring extending between
packers for injection into lower intervals (G-3 and G-4).
Return well to injection.
~ ,
16. I hereby certify that th~..forego?g is true and correct
SIGNED '~Lz'%(' TITLE Area Superintendent
DATE November 9, 1977
(This space for State office use)
APPROVED By~ C ~/~ __i
CONDITIONS O~APPROVAL, IF ANY:
See Instructions On Reverse Side
DATE
Approved Copy
Form No P--4
]?~J~r a- I-?0
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
OIL []
WELL WELL Water Injection
NAME OF OPERATOR
Amoco Production Company
ADD~ or OPn%ATOR
P. 0. Box 779, Anchorage, Alaska
LOCATION OF
Leg 2, Slot 2, SMGS Platform "D,"
699' FSL, 1872' F~L, Sec. 35, TSN,
R13W, $.H.
SUBMrT l~ DUPLICA~
99510
APl NL~i~K/CAL CODE
50-133-20104
LEJkSE DESIGNATION AND S~RIAL NO
ADL-18746
IF INDiA~ AL,Of i~1-- OR TRIBE
8 L~IT F)J{A4 OR LEASE NA~E
SMG S Un! t
11
l0 F~D ~D P~L OR WILDCAT
~outh Middle Gro~d Shoal
h S~ T R M (~OM HO~
O~~
_Sec. 35, T8N, R13W, S.M.
. 68-32
REPORT TOTAL D~-'rl~ AT END OF MONTH CHA~N'G~S IN HOLE SIZE CARING AND C~WIF~NT/NG JOBS INCLUDING DEPTH
SET AND VOLI3%VIES USED PEP,.FOHATIONS. TESTS ANT) RESULTS FISHING JOBS JLq~IK IAI HOLE AND SIDE-TI~ACKED HOLE
AND ANY OTHiEI% SIGNIFICANT CHANGES IN HOLE CONDITIONS
~S~ummary .of. Operations for the Month of October 1974:
October 1-3:
October 4-6:
Set bridge plug at 10,122', spotted 28 sacks Class G
cement containing .4% R-5 on top of bridge plug, set
packer at 9480' and cement squeezed into perforations
10,090-10,110' with 2000 psi surface pressure.
Drilled out cement from 10,115' through 10,122'.
Pushed bridge plug to bottom of the hole and set packer
at 10,040'. Acidized the following perforations:
10,050-10,080'; 10,090-10,110'; 10,140-10,220'; and
10,240-10,310' with 417 barrels of 12-10 mud acid at
4000 psi and had communication. Displaced annulus with
filtered inlet water.
October 7-8:
Set 9-5/8" Model "D" packer at 9350'. Tested seal
assembly and ran 3-1/2" Buttress tubing. Hydrotested
to 5000 psi. Displaced annulus with treated water and
landed tubing. Installed the tree and tested to 3000 psi
and started in3ection.
October 17:
Injecting at 3870 BWPD with 3400 psi pressure.
Final Report.
Area Superintendent
November 13, 1974
oil Ond gOS conservation committee bytho 15th of the succeeding month, unle~ otherwise d~rocted.
~ ~o ~-.~ STATE
ALASKA
~ ~- 1-70
OIL AND GAS CONSERVATION COMMITTEE
SUBMrT I~ D[~LICAT~
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
I
OIL l"'] o,, ~ o~,,,-, Water Injection
WELL WELL
2 NAM~ OF OPerATOR
Amoco Production Company
3 ~DR~SS or o~~
P. O. Box 779, Anchorage, Alaska 99510
4 ~CA~ON OF w~
Leg 2, Slot 2, SMGS Platform "D" 699' FSL
1872' FWL, Sec. 35, T8N, R13W, S.M.
AP1 NL'~.{ERICAL CODE
50-133-20104
LEASE DE~:GNA?ION A.%'D SEIRIAL NO
ADL-18746
IF INDiA~ A~7~ O~ TRIBE
L~IT F.~ OR LEASE
SMGS Unit
W~ NO
11
l0 FLELD A_ND i~OOL OR WILDCAT
South Middle Ground Shoal
11 SEC T R M (BO'I~I'OM HOL,~
o~
Sec. 35, T8N, R13W, S.M.
12 PER.MIT ~0
68-32
13 REPORT TOTAL DEl>TH AT END OF MONTH CHANGES IN HOLE SIZE CA,~ING AND C~/IENTING JOBS INCLUDING DEPTH
SET AND VOL~ USED PERFORATIONS. ?ESTS A.ND RESULTS FISHI~TG JOB~ JL~"NK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CI-'LA. NGES IN HOLE CONDITIONS
Summary ._of Op.erations During, ..September 1974:
September 14-17:
Pulled the tubing and cleaned out the hole to
9459'. Milled over and retrieved the packer
at 9530'.
September 17-19:
Set cement retainer at 2188' and bridge plug at
2403'. Cement squeezed casing leak with 185 sacks
of Class "G" cement.
September 20-22:
Drilled out cement from 2188-2390' and pressure
tested the annulus to 1000 psi. Held okay. Cleaned
out the hole to PBD.
September 23-27:
Cement squeezed G-3A zone from 9820-9927' with
200 sacks of Class "G" cement under 3000 psi pres-
sure. Drilled out the cement and pressure tested
to 2000 psi. Bled to 1150 psi in 15 minutes.
Cleaned out the hole to 10,417'.
September 28-30:
Ran bridge plug and packer for acid st/mulation of
the G-4 zone and found communication between the
zones. Presently PreParing to cement squeeze to
shut off communication. ~ ~ ~ ~ ~ ~ ~ ~
OCT 9 i : 74
SmN~D - ~ Area Superintendent DA~ October 4, 1974
NOTE--Report on this form ii required for each calendar moflth~ regardless of the status of al)orations, and must bo filed in duplicate with the
oil and gas conservation committee bythe 15th of the euoceecling month, u~le~ otherwise d,rected.
Amoco Production Company
P. O. Box 779
Anchorage, Alaska
99510
September 17, 1974
Pile: GJR-638-WF
Mr. Homer L. Burrell, Director
Division of Oil and Gas
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
Re: Sundry Notices and Reports on Wells
South Middle Ground Shoal Unit Well No. 11
Attached is a State of Alaska Form 10-403 requesting permission
for a workover of SMGS 18746 Well No. 11 as described herein.
Yours very truly,
George J. Ross
Area Superintendent
CONFER:
FILE:
Attachment
SF..f' t 9 'i974
Form 10-403
REV I
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
~bmit "Intentions'* in Trtplio~t~ ~'~ ~
& 'Subsequent Reports" m Ouphcmte
~ AP1 NUlV~FA~ACAL CODE
50-133-20104
6 LEASE DEff~IGNA~ION A-ND SERIAL NO
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use th~s form for proposals to drill or to deepen
Use APPLICATION FOR PER~II'-2-'' for such pro~o~als )
oil ~ OAS ~--I
WELL ~__ WELL~ OTHEE
Water Injection
2 NAME OF OPERATOR
Amoco Production Company
3 ADDRESS OF OPERATOR
P. O. Box 779, Anchora~e~ Alaska 99510
4 LOCATION OF WELL
At sut face
Leg 2, Slot 2, SMGS Platform "D"
699' FSL, 1872' FWL, Sec. 35, TEN, R13W, S.M.
13 ELEVATIONS (Show whether DF, RT, GR, etc
Check Appropriate Box To I,nclicate Nature of N~tice, Re
ADL-18746
? IF INDIAN, ~TTEE OR TRIBE NAME
UNIT, F2A{NI OR LEASE NA/YIE
SMGS Unit
g. %NELL NO
11
10 FIELD A~D POOL, OR WILDCAT
South Middle Ground Shoal
11 SEC , T , R , M , (BOTTOM HOL~
OBJECTIVE)
Sec. 35, T8N, R13W,
12 Pr~M2~IIT NO
68-32
mrtorO~h~Da~o
S.Mo
EUBIEQ~ENT RBPOIT OF:
NOTICE OF INTENTION ~0:
~ CHANGE PLANE
__
FRACTLRE TREAT MULTIPLE COMPI,ETE FRACTURE TREATMENT ALTERING CASING
SHOOT OR ACIDIZE ABANDONs SHOOTING OR ACIDIZING ABANDONMENTs
REPAIR V, ELL (Other)
~Other) (NOTE: Report results of multiple completion on Well
Completion or Reeompletion Report and Los form.)
~ scans Pnoeoss, os C0~t*L~D 0PZ~aTmxS (Clea~l~ state all pertinent details, and giv~ pertinent dRtes, includln~ estimated dRte 0f startin$ an>
proposed work.
We propose to repair a casing leak at about 2300' by cement squeezing
the leak with 150 sacks Class G cement.
Perforate G-3A zone from 9870-9900' with 2 JSPF, and cement squeeze the
G-3A perforations 9870-9900' and the top ten feet, 9920-9930' of the
G-3B perforations with 200 sacks of Class G cement.
Acidize the G-4 zone perforations:
Perforations
Treatment
10,240-10,310' 7000 gallons 12-10 Ultra Mud Acid~
10,140-10,220' 7000 gallons 12-10 Ultra Mud Acid
Reinstall downhole equipment and tubing and put on injection.
Work is anticipated to begin September 14, 1974.
Area Superintendent
na?~September 17, 1974
!,
CONDITIONS 0'F ~PPROVAL, IF ANal:
TITLE
See Instructions On Reverse Side
~proved Co,. y
_ Rot~rne .d i
Amoco Production Company
P. O. Box 779
Anchorage, Alaska
99510
October 10, 19 73
File: WMJ-540-WF
Mr. Homer L. Burrell, Director
Division of Oil and Gas
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99504
Dear Sir:
Re: Monthly Report of Drilling and Workover Operations
SMGS Unit Well No. 11
SMGS Unit Well No. 12
MGS 17595 Well No. 4
--'j-'-I GFOL_i~I
t 2 GEOL
--I 3 GEOL
REV
DRAFT
SEC
CONFER:
FILE.
Attached are State of Alaska Forms P-4 reporting workover operations
on the above wells for the month of September 1973.
Yo~s very t~ul~
Dis trict (;~uction Superintendent
Attachments
ANCh <.4:i;,--,O'-:,
~Fm'm Ho P--4
~ S- I-?0
,STATE O~F ALASKA
OIL AND GAS CONSERVATION COMAAI'I-i'EE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
On.~.~LL [--'] O*,,.,~.L [--'J 0'~"," Water In~ection
~ N~ OF OPhiR
~oco Production Com~an7
3 ~D~S OF OPhiR
P. O. Box 779~ Anchorage~ Alaska
4 ~CA~ON OF W~
At Surface:
SUBMIT IN I~ol~LICA'I~:
99510
Leg 2, Slot 2, SMGS Platform "D,"
699' FSL, 1872' FWL, Sec. 35,
T8N, Ri3W, S.M.
APl NI~{ERICAL CODE
50-133-20104
6 LE~SE DESiGNAT'ION A\-D S~RIAL NO
~ ADL-18746
I ';
IFINDIA]~ AIADTTEE OR TRIBE NAME
8 L.~IT F.~:LM OR LEASE NAME
SMGS Unit
9 w~ NO
11
lO iu'k!~r~ AND POOL OR WILDCAT
South Middle Ground Shoal
n sm: T ~, ~ (~o~-o~,~ ~OL~
oa,mc-rzv~
Sec. 35, T8N, R13W, S.M.
12 PEP.MIT NO
68-32
13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE CASING AND C~--'~F_.NTING JOBS INCLUDING DEPTH
SET AND VOLLtMES USED PERFORATIONS, 'rESTS AND RESULTS FISHING JOB~ JUNK IN HOLE AND SIDE-'FROCKED HOLE
AND A.NY OTHER SIGNIFICANT CliANGES IN HOLE CONDITIONS
Summary of Operations for September 1973:
September 1 - 5:
September 6 - 7:
Injecting water.
Ran spinner and radioactive tracer surveys and
lost tools and wireline in hole. Recovered
survey tools and wireline and returned well
to water injection service. Operations complete
September 7, 1973. Final Report.
~!'l!$lC~ 0i~ Ot~ ~b~'D GAS
Ab!CHORAG~
14 I hereby cert oorr~,et ~
NOTE ~Report on this fo~4quired for eO~ calendar ~ths regardless of the status of operations, Qnd must ~ filed In duplicate with the
oil and gas con~.a~n ¢ommiHee bythe IS~ of the suQ=~ing ~n~, ~le~ otherwise d~rected.
Amoco Production Company
P. O. Box 779
Anchorage, Alaska
99510
October 10, 19 73
File: WMJ-541-WF
Mr. Homer L. Burrell, Director
Division of Oil and Gas
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99504
Dear Sir:
Re: Sundry Notices
SMGS Unit Well No. 11
SMGS Unit Well No. 12
Attached are State of Alaska Forms 10-403 transmitting our subsequent
reports of workovers to improve water injection profiles in the sub-
j ect wells.
~rs very true,
w.
District ~r0duction Superintendent
Attachments
Form I0 -403
I~EV I - t0-75
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
I~abmlt "Intentions" in Trtplimte f
& 'Sul~equent Reports" m Duphc~t~
'5 AP1 NUMEI~CAL CODE '
50-133-20104
S LEASE DESIGNATION A.ND S~ NO
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not u~e this form for proposals to dlHl or to deepen
Use APPLICATION FOR f~ll'-2" for such pro~als )
oil ~ GAS
WiLL , ' WELL~ OTHER
Water Injection
NAME OF OPERATOR
Amoco Production Compan7
ADDRESS OF OPERATOR
P. 0. Box 779, Anchorase, Alaska 99510
4 LOCATION OF WELL
^tsu, face Leg 2, Slot 2, SMGS Platform "D," 699' FSL,
1872' FWL, Sec. 35, T8N, R13W, S.M.
13 ELEVATIONS (Show whether DF, RT, GR, etc
RKB 100' above MSL
14 Check Appropriate Box To I,ndicate N~ture of I~tice, Re
NOTICe 0F IN~N~ION TO:
PULL oa ALTEa CA*IN6
MCLTIPL[ COMPI,~T~
ABANDONs
CHANG~ PLANS
TEST WATER SHUT-OFF
FRACT~ RE TREAT
SHOOT oa ACID~ZJJ
REPAIR 1% ELL
ADL-18746
~ IF INDIA2~, ~J~bO'~-r~ OH THJBE N~
8 UNIT, FA. Ih~ OR LEASE NAME
SMGS Unit
9. WELL NO
11
10 FIELD AND POOL, OR WILDCAT
South l~ddle Ground Shoal
11 SEC , T , R , M , (BOTTOM HOL~E
OBJECTIVE)
Sec. 35, T8N~ R13W~ S.M.
12 PER/VI~T NO
68-32
~, or Other
~UBIEQUENT RBPOIT OF:
WaTeR SHUT-Orr J RBPAZa~NO W~LL
raacTca~ TR~AT~r~N~ ! ~LT~aXNG C*SZNG
SHOOTING OR ACIDIZING ABANDONMENT*
(O~heF)
(NOT~: Report re,ults of multiple completion on Well
~Other) ComDletion or Recompletion RePOrt and Log form.)
15 DI',qCRIBEI'ROPOSED OR COMPLETED OPERATIO.~S (Clearly stats'all pertlneut details, and ~tv~ pertinent dates, including estimated date of starting an}
proposed work,
Operations to improve the water injection profile of this well commenced August 20,
1973. Pulled injection tubing and milled out permanent packers at 9549' and 9570'.
Cleaned out interval 9908-10,050' with bit and casing scraper. Ran retrievable
packer and set at 9840'. Performed spinner and radioactive tracer surveys of
perforated intervals 9870 - 9900' and 9920 - 10,000'. Confirmed no communication
between these intervals. Cleaned out to 10,445' with bit and circulated hole.
Ran Gamma-Ray Collar Correlation Log 9450- 10,445'. Perforated 9630-9670';
9930-10,000'; 10,010- 10,030'; 10,050-10,080'; 10,090-10,110'; 10,140-10,220';
and 10,240-10,310' with 2 JSPF. Set permanent packer on wireline at 9530' and
ran injection tubing and commenced water injections at 11:00 p.m., 8-27-73. In-
jection rate 8-28-73, 5679 BWPD at 2950 psig. Performed spinner and radioactive
tracer survey 9-6-73 and lost survey tools and wireline in hole. Recovered survey
tools and wireline 9-7-73 and resumed water injections. Operations complete 9-7-73.
Water injection rate prior to workover: 4414 BWPD at 3000 psig on 8-14-73.
Rate subsequent to workover: 5005 BWPD at 2850 psig on 9-11-73. Final Report.
16 I hereby and correct
SIGNED TITLE Dist. Production Supt.
(This ,pace for S~~,~r~ ~' ~
APPROVED BY--~-~*'"~ TITLE
CONDITIONS OF IF ANY:
~ IntruSions ~ Reve~ Side
DaTZ October 10, 1973
I/~
OCT
~ s- ,-?o ,STATE ,' ALASKA
OIL AND GAS CONSERVATION COMMITrEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
OIL
WgLL ~ GAB
w,LL [~ o~,,,,j Water Injection
~oco Production Comply
P. O. Box 779, ~chora~Al~ka
4 LOCA~ON OF WF~
At Surface:
STJBMrr II~ ~LICA'r~
99510
Leg 2, Slot 2, SMGS Platform "D,"
699' FSL, 1872' FWL, Sec. 35, T8N,
R13W, S.M.
^P~ ~{~mc~ c6D~' " '
50-133-20104
ADL-18746
SMGS Unit
11
_ Sq.uth Middle Ground Shoal
1I SEC T, R , 1%{ (~%"7~M HOL~
o~
_Sec~ 35, T8N, R13W, S.M.
~ ~[T NO
13 REPORT TOTAL DEPTH AT ~ND OF MON~VH CI~\'GES IN HOLE SiZe, CASING A~ C~NG JOBS INCLUDING DEP~
SET ~ VOL~ UiD P~O~TIONS, ~TS ~ ~SUL~ FISHING JO~ J~K ~ HO~ ~D SIDE-~CK~ HO~
~D ~Y O~ SIGNIFIC~T ~G~ ~ HO~ ~ITIONS
Sum~.ary of OPe.rations During August 1973:
August 20 - 23:
Shut in well August 20. Pulled injection tubing and milled
out permanent packers at 9549' and 9570'. Cleaned out
interval 9908 - 10,050'.
Aug ust 24-27:
Ran retrievable packer and set at 9840' and ran spinner
and radioactive tracer surveys across perforated intervals
9870- 9900' and 9920- 10,000' and confirmed no communica-
tion between these intervals. Cleaned out to 10,445' and
ran Gamma-Ray Collar-Correlation log 9450 - 10,445'. Per-
forated following intervals with 2 JSPF: 9630- 9670';
9930-10,000'; 10,010-10,030'; 10,050-10,080'; 10,090-
10,110'; 10,140-10,220'; and 10,240-10,310'. Set perman-
ent packer on wireline at 9530'. Ran injection tubing and
returned well to water injection service.
August 28- 31: Injecting water.
(
Mm No p~ STATE OF ALASKA
~ B- I-?0
OIL AND GAS CONSERVATION COMMITTEE
SUBMIT IN DUPLICATE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0XLWZLL ~--~ G,O.=LL ~] OTnZ, Water Injection
NAME OF OP~%ATOR
Amoco Production Com~an7
ADDRESS OF OPERATOR
P. O. Box 779~ Anchorage: Alaska 99510
4 LOCATION OF WElL
Surface: Leg 2, Slot 2, SMGS Platform "D,"
699' FSL, 1872' FWL, Sec. 35, T8N,
R13W, S.M.
~ APl NU~fERICAL CODE
50-133-20104
LEASE DF~iGNATION A\-D S~IAL NO
~L-18746
IF I~IA~ A~T~ O~ TRIBE NAME
8 L~IT F.%~{ OR LEASE
SMGS Unit
9 WELL NO
11
10 FLF-~ A_ND POOL OR WILDCAT
South Middle Ground Shoal
11 SEC T R, M (BOI'TOM HOLE
Sec. 35, T8N, R13W, S.M.
12 PER.MIT NO
68-32
13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMI~ USED PERFORATIONS, TESTS ~ RESULTS FISHING JOI~ JLrNK IH HOLE AND SIDE-TRACKED HOLE
A_ND ANY OTHER SIGNIFICANT CHANGES IN HOL~ CONDITIONS
S~mmary of operations During July 1973:
Workover deferred due to revisions to procedure; revised notice of
intent submitted for approval August 14, 1973.
14 I hereby ce _ true and eor~
smx~v/,4 ~// ~//~~~ TXT~ District Production Supt,,~ August 22, 1973
oil Q~nle~commi~ee by the 15~ of the eucc~ding ~n~, ~le. Otherwise &rected.
August 14, 1973
File: WMJ-438-WF
Mr. Homer L. Burrell, Director
Division of Oil and Gas
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99504
Dear Sir:
Amoco Production Company
P. O. Box 779
Anchorage, Alaska
99510
REV
- DRAPT
_
_
-FILE=
Re: Sundry Notice of Intent
Perforating SMGS Unit Well No. 11
Attached for your approval is a State of Alaska Form 10-403 reporting
our intent to clean out, cement squeeze a thief zone if necessary, and
perforate selected intervals in this well to improve the water injec-
tion profile. This is a change of plans from our original sundry dated
May 21, 1973. We expect to begin about August 27, 1973.
w.
Distri~oduction Superintendent
Attachment
AtJ 5
D?i!_"-.ICN OF OIL Al,ID GAS
ANCHORAG~
Form I 0
REV. I - 10-7'J~_
~bmit "Int~ntions" in Triplicate
& "Sub~eq-ent Reports" in Duplic~te
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON wLq. Ls
(Do not use this form /or proposals to drill or to deepen
Use "APP-LICATION 'FOR ~'EB~I'i'---'" 'for such 'p~o~osah[)
OIL ~ GAS
~,.~. ~ELL [] OT~ER Water Injection
2. NAME OF OPERATOR
Amoco Production Company
3. ADDRESS OF OPERATOR
P. 0. Box 779, Anchorage, Alaska ~9~;I-0
4. LOCATION OF WELL
^t ~u,-~.~ce Leg 2, Slot 2, SMGS Platform "D," 699' FSL,
1872' ~'~L, Sec. 35, T8N, R13W, S.M.
13. ELEVATIONS (Show whether DF, RT, GR, etc.
RKB 100' above MSt
14. Check Appropriate l~X To I,ncJlcate Nature of N~tice, Re
5. APl NUiVLF22CAL CODE
50-133-20104
$. LEASE DESIGNATION A.ND SERIAL NO,
ADL-18746
7. IF INDIA.N, ALLOTTEE OR TRIBE N,MVI. E
8. UNIT, FA/~VI OR LEASE NAME
SMGS Unit
9. WELL NO.
11
10. FIELD AND POOL, OR WILDCAT
South Middle Ground Shoal
11. SEC., T., R., M., (BOTTOM HOL~
OBJECTIVE)
Sec. 35, T8N, R13W, S.M.
12. PEI~T NO.
68-32.
~, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF ~ PULL OR ALTER CASING
BUBSEQUENT R2PORT OF:
REPAIRING WELL
WATER SIIUT-OFF' '
FRACTURE TREAT J--I MULTIPLE COMPI,ETE FRACTURE TREATMENT ALTERING CASING
SHOOT OR ACIDIZE ~ ABANDON~ SHOOTING OR ACIDIZINO ABANDONMENT*
REPAIR WELL CHANOg PLANS -- (Other) ,
~Other) (No~: Report results of multiple eom~letion on Well
Completion or Reeompletion Report and Log form.)
O~:Sc~[Bg Pm~POSED OR CO~fPLg~gD OPERATION8 (Clearly stat. all p~rtinent details, and gtv~ pertinent dates, lncludin$ estimated date of starting any
proposed work,
~o~kove~ plans have been revised for ~he ~ubjeck well subsequen~ ~o approval of ou~
~n~al pl~ on Form 10-403 da~ed ~ay 21, 1973. ~e now propose ~o perform ~he follow-
,nE s~eps ~o ~mp~ove khe wa~er ~njec~o~ profEle of ~h~s
1. Pull tubing, drill out permanent packers at 9549' and 9570' and clean out to 10,050'.
2. Run a retrievable packer to set at 9840', resume water.injections and run radioactive
tracer profile survey across perforated intervals 9870-9900' and 9920-10,000'. If
tracer survey indicates an excessive volume of water is being injected into thief zone
interval 9870- 9900', then that interval will be cement squeezed with 120 sacks Class
"g" cement.
3. Clean out to 10,445' PBTD with bit.
4. Perforate following intervals at 2JSPF: 9630-9670', 9930 10,000', 10,010-10,030',
10,050-10,080' 10,090 10,110' 10 140-10,220' and 10,240-10,310'
, -- ,, , ·
5. Set a permanent packer at 9530', run water injection tubing i
6. Return well to ~ ~ injection service.
anticipa~ th~ wc '~will begin about August 27, 1973·
SIGNED !~/' Z~'~ ~'~~ 'TITLE District Production ~ · DATE u-I~73
:;:: .......
(This .pace fo~ State o~ ' "
See Instructions On Reverse Side
OIL []
WKLL
STATE 0~,AiASKA
OIL AND GAS CONSERVATION COMMIY~EE
MONTHLY REPORT O'F DRILLING
AND WOR'KOVER OPERATIONS
GA.,~LL [] OT.~, Water Injection
2. NAME OF OP~.ATOR
Amoco Production Compan7
8. ADDRESS OF
P. O. Box 779~ Anchorage, Alaska
4. ~OCA~ON O~ w~U~
SUBMIT ~ DUPLICA~
99510
Surface: Leg 2, Slot 2, SMGS Platform "D,"
699' FSL, 1872' FWL, Sec. 35, T8N,
R13W, S.M.
APl NUiV/ERICAL CODE
50-133-20104
LEASE DESIGNATION AN'D SEIRIAL NO.
ADL-18746
? IF INDIAN. ALOTTEE OR TRIBE NAME
8 L~NIT FA_riM OR LEASE NAME
SMGS Unit
I0 FL~J~D A-ND POOL Om WILDCAT
~outh Middle Ground Shoal
I1 SEC T.. R, M. (BOTTOM HOLE
Sec. 35, T8N, R13W, S.M.
1~. P~MIT NO
68-32
13. RF-~ORT TOTAL DEPTH AT END OF MONTH CHANGF,~ IN HOLE SIZE. CASING ANtD CEMENTING JOBS INCLUDING DEPTH
SET ANE~ VOLLrM]~ USED, PEi~FOI~ATIONS. TESTS A_N-D HESULTS 'FISHING JOB//; JUnK Ilq HOLE AND SIDE-TI~ACKED BOLE
A~D A~Y OTI-IE~ SIGNIFIC~T CI-IA_~3ES IN HOLE C~ON~ITION$
Summary.of. Operations Durin~:Uune 1973.:
Workover deferred due to revisions to procedure, revised notice
of intent will be submitted.
JUl. g 4 lg?
DIVISION OF OIL AND GAS
ANCHORAGE
.,~x~'-~(~ Vl-'~'lf~'~=r~ Supervisor in Charge DA" July.23' 1973
NC~ --Report on this form Is required fo~i~ch oolendor moflth~ regQrdless of the utotue of operations, end mutt I)e filed In dupli~ate with the
oil Grid gas ~oneervatbn Qommittee b~ the 15th of the suuQeedlng month, unless otherwise directed.
June 14, 1973
File: WMJ-329-~
P. O. Box 779
Anchorage ,- Alaska
Mr. Homer L. Burrell, Director
Division of Oil and Gas
Department of Natural Resources
State of Alaska
3001 Porcupine D~ive
Anchorage, Alaska 99504
Dear Sir:
Re: Monthly Report of Drilling and Workover Operations
MGS 17595 Well No. 4
MGS 17595 Well No. 6
SMGS Unit Well No. 11
Attached are State of Alaska Forms P-4 reporting workover operations
on the subject wells for the month of May 1973.
Yours very truly,
W. M. Jones
District Production Superintendent
At tachments
¢
~ ~" ~'-~ STATE oF ALASKA
~ ~- 1-70
OIL AND GAS CONSERVATION CONU~II-rEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
ox,. I~ o,, [~ oTa=, Water Injection
WKLL ~VI~LL
SUBMIT IN DIJPLICAT~
NAME OF OPEi~ATOR
Amoco Production Company
A~DRESS OF OPERATOR
P. O. Box 779, Anchorage, Alaska
LOCATION OF WELL
Surface:
99510
Leg 2, Slot 2, SMGS Platform "D,
699' FSL, 1872' FWL, Sec. 35,
T8N, R13W, S.M.
API N~IEPACAJ~ ~ODE
50-133-20104
LEASE DF~iGNAT'ION AND SE1RIAL NO
ADL-18746
IF INDIA)~ ALOTiEE O)~ TRIBE
8 L-~IT F.a.I~f OR LEASE NAME
SMGS Unit
g w~ NO
11
10 FLEI~ A_X~D I:NZK)L OR WILDCAT
South M/ddl~ Ground Shoal
I1 SEC T, R, M (BO'FTOM HOLE
Sec. 35~ T8N~ R13W~ S.M.
1~ PEP, JVIIT N'O
,, 68-32
"13R'EPORT TOTAL DEPTH AT END OF MONTH CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEP~H
SET AND VOLI/MES USED PERFORATIONS TESTS AND RESULTS FISHING JOBS JIINK IN HOLE AND SIDE-TRACKED HOLE
A.N'D ANY OTHER SIGNIFICANT CHANGES IN HOL,~ CONDITIONS
Summary of Operations During May 1973:
Workover deferred; plans are being revised. Appropriate notice of
intent will be submitted as soon as workover revisions are finalized.
JUN ! 5 19/3
DIViSi-~, r ,..h. AND GAS
ANCHORAGE
~ i ,
14 I hereby certify that the forego/~] m true and correct
S,G~ "~D~ ~77, ~~ =TLE District Prod. Supt. DA~ June 14, 1973
, ,, - ~ - ~.~ ......
May 18, 1973
File: WMJ-272-WF
Mr. Homer L. Burrell, Director
Division of Oil and Gas
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99504
Dear Sir:
Re: Sundry Notice of Intent
Perforating SMGS Unit Well No. 11
Amoco Production Company
P. O. Box 779
Anchorage, Alaska
99510
Attached for your approval is a State of Alaska Form 10-403 reporting
our intent to clean out and perforate selected intervals in the subject
well to improve the water injection profile. We expect to begin about
May 23, 1973.
Yours v~ly,
District P~oduc~'ion Superintendent
At t achmen t s
MAY 21. I9;'3
1'4 t- C, li. AIqD OAS
ANCHORAGE
Form I0 -403
R~V ! - Io-?~
STATE OF ALA$KA
OIL AND GAS CONSERVATION COMMII'I'EE
~brnit "Intentions" in Trtpltmte~
~ 'Su~quent ~" ~ Duph~
5 APl N~C~ CODE
50-133-20104
'8 ~E D~GNA~ON ~D S~ NO
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use thru form for proposals to dzdl or to deepen
Use APPLICATION FOR ~EI~I]~---'" for such pro~o~ls )
1
o,,.~ELL ~.~ OAS~ELL [] OTHEa Water Injection
2 NAME OF OPE/~TOR
Amoco Production Compan7
3 ADDRESS OF OPERATOR
P. 0. Box 779, Anchorage, Alaska
4 nOCAT~ON OF W~-'-n
^tsurf~¢e Leg 2, Slot 2, SMGS Platform "D,"
699' FSL, 1872' FWL, Sec. 35,
T8N, R13W, S.M.
99510
Check Appropriate Box To Indicate Nature of I~otice, Rel
13 ELEVATIONS (Show whether DF, RT. GR, etc
RKB 100' above MSL
14
ADL-18746
'/ IF IN'DIA_N, ALI.,O-l-r~:~- OR TI~IBE NA/VL~
8 UNIT, FARM OR LEASE NAME
SMGS Unit
9. WELL NO
11
10 FlmLm, ~tD POOL, OR WILDCAT
South Middle Ground Shoal
11 SEC , T , R , M , (BOTTOM HOL~
OBJECTIVE)
Sec. 35, T8N, R13W, S.M.
12 Pl!IN.lv~ NO
68-32
)oct, or Other
NOTICB OF INTENTION TO:
TEST WATI~R SHUT-OFF
FRACTL RE TREAT
SHOOT OR ACIDIZE
REPAIR ~ ELL
PULL OR ALTER CASINO
MULTIPLE COMPI,ETE
ABANDONs
CHANGE PLANS
FRACTURE TREATMENT --[ ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMEN'Te
(Other)
(NOTE Report results of multiple completion on Well
~Other) Completion or Recompletion Report and Log form.)
IS D~SCRIBE PROPOSED OR COMPLETF-D oPZaATIOWS (Clearly state all pertinent details, and gi~ pertinent dates, including estimated date of starting
proposed work,
We propose to perform the following work to improve the water injection
profile of this well:
.
Pull tubing, drill out permanent packers at 9549' and 9570' and
clean out to 10,445'.
.
Perforate following intervals at 2JSPF: 9630-9670' 9920-10,000'
10,010-10,030' 10,050-10,080' 10 090-10 110' 10 140-10 220'
and 10,240-10,310 '.
Be
.
We anticipate this work will begin about May 23, 1973.
APPROVED BY wil~ w - m ~ TI~
Set a permanent packer at 9530', run water injection tubing and
sting into packer.
Return well to water injection service.
I iAY 'fl ! ig'/3
TITLE District Production Supt.
i~ ,_ i- CtL ~:,I',,~D GAS
ANCHORAGE
See Instructions On Reverse Side
APproved C~y
Returned
l~rm N'o P--4
~ ~- 1-70
STATE ~r ALASKA
OIL AND GAS CONSERVATION CONV~I~EE
SUBMrT IN DIYPLICATE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
AP1 NL~.IEHICAL CODE
50-133--20104
LEASE DESIGNATION AND SERIAL NO
ADL-18746
1 ~ IF INDIA]~ ALOT'FEE OR TRIBE NAME
OXL [] o,,. ['--] or-ri Water Injection
WELL W~LL
8 L.~IT F.~{ OR LEASE NAME
SHGS Unit
NAME OF OPERATOR
A~oco Production Company
ADDRESS OF OPERATOR
P. O. Box 779, Anchorage, Alaska
99.510
4 LOCATION OF WELL
Surface:
Leg 2, Slot 2, SMGS Platform "D,
699' FSL, 1872' l~L, Sec. 35,
T8N, R13W, S.M.
9 WELL NO
11
10 FiF-i~D ~ND POOL OR WILDCAT
South Middle Ground Shoal
11 SEC T, R, M (BO~'TOM HOI~E
ommcTnr~
Sec. 35, TSN, R13W, S.M.
12 PE~V[IT NO
68-32
13 REPORT TOTAL DEPTH AT END OF MONTH CHANGES IN HOLE SIZE. CASING AND C~VIF~NTING JOBS INCLUDING DEPTH
SET AND VOLU1VIES USED PERFORATIONS. TESTS ~ HEiULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
Story of .Opera_t_ions._ ...During A. prl..1.1972:
April 1- 8, 1972
April 8- 14, 1972
PBTD 10,445'. Shut well in and prepared to
pull and repair leak in tubing.
Kill ~ell. Nipple up and test BOP. Pull tubing.
Found collar washed out 277 Joints do~m. Rerun
3-1/2 in. tubing and hydrotest. Load annulus
with inhibited water. Land tubing, nipple up
and test wellhead. Resigned water injections.
Final Report.
14 I hereby certify that ~n~~~olTect Supervisor in Charge May 12, 1972
SXGN~D JOHN C. -~CHIr v?_._?=__~. ~ DA~
NOTE--Report on this f~m is required for eo~ calendar ~nth% regardless of the status of operati0ns~ and must ~ filed in duplicate with the
oil and gas conservatbn eommiffee b~the 15~ of the suec~4mg mn~,~le~ otherwme d~rected.
( (
A RICA PETnOLEUM CORPORATION
P. O. Box 779
A~uchorage, Alaska 99501
December 23, 1969
HLB __ , -
TRM .... -
KtV
HW'(
REL
_
File:
FKK- 8ZZ-WF FIL~ _ -
Re:
Commencement of Water
Injections - South Middle
Ground Shoal Unit Well No, 11
Mr, Homer L. Burrell, Director
Division of Oil and Gas
Department of Natural Resources
State o£ Alaska
3001 Porcupine Drive
Anchorage, Alaska 99504
Dear Sir:
Transmitted herewith is a sundry notice of water injection
commencement at SMGS Unit Well No. 11, Injections began on
December 21, 1969.
Yours very truly,
F. ~. ~z'ebill
Area Superintendent
Attachment
DIVISION OF OIL AND. GAS
Submit "Intentlons" in Triplicate
& "Subsequent Reports" LU Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to dltll or to deepen or plug back to a dif£1erent reservoir
Use "APPLICATION FOR PEr{A~IT--" for such proposals )
API NU/VIERICAL CODE
50-133-2.0104
LEASE DESIGNATION A_ND SERIAL NO -~
AJDL- 18746
2 NAME OF OPEP~ATOR
Pan American Petroleum Corporation
ADDRESS OF OPI~RATOR
P. O. Box 779, Anchorage, Alaska 99501
LOC*T~O~ OF W~L
At surface Leg Z, Slot Z SMGS Platform "D" 699' FSL,
1872' FWL, Section 35, T8N, R13W, S.M.
13 ELEVATIONS (Show whether DF, RT, GR, etc
RKB 100' above MSL
Check Appropriate Box To Indicate Nature of N~oti'ce, Re
8 UNIT, FAR~ OR LEASE NAME
South Middle Ground Shoal Unit
WELL NO
11
10 FIELD A~FD POOL, OR WILDCAT
South Middle Ground Shoal
11 SEC , T , R , M , (BqYI'rOM HOLE OBJECTIVE)
Sec. 35, T8N, R13W, S.M.
12 PERM. IT 1~O
68-32
:~rt, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF ~ PULL OR ALTER CASING
SUBSEQUENT REPORT OF:
FRACTURE TREAT [__[ MULTIPLE COMPI,ETE FRACTURE TREATMENT ALTERING CASING
SHOOT OR ACIDIZE ~__~ ABANDONs SHOOTING OR ACIDIZING [_.__J ABANDONMENTS { I
REPAIR WELL CHANOE PLA~S (Other) CommenceInjections ~-
(Other) (NOTE. Report results of multiple completion on'Well
Completion or Recompletlon Report and Log form.)
15 DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an~
proposed work.
Water injections commenced on December 21, 1969. The initial injection
rate was 1640 BWPD at 2000 psig wellhead pressure.
DJYJSION OF OIL ANQ O~
16 I hereby certify that the foregoin~ is true and correct
TITLE Area Superintendent
DATE Dec. 23, 1969
(This apace for State office use)
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY:
TITLE
DATE
See l~nstructions On Reverse Side
Approved Copy
Returned
Form No P--4
s. sv ~-~0-s: STATE O~ ALASI~
O~L AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
SUBMIT IN DEPLICA~E
i
OIL ~ GAS ~-~ OTHER
W~;LL -- wELL
2 NA2d~ OF 01~ERAToR
Pan American Petroleum Corporation
~ AD~3RESS OF OPhiR
P. 0. Box 779
'4 ~A~ON ~
Leg 2, Slot 2, SMGS Platform "D"; 699' FSL, 1872' FWL,
Section 35, T8N, R13W, S.M.
50-133- 20104 KLV ----
L~SE D~iGNAiION AXD S~ ~ ~ ~
REt :
? IF INDI ~,N, ALOTTEE OR
FILE
8 Lr~*IT,F.a-B-M OR LEASE NA_%IE
SMGS Unit
9 WELJ~ NO
I1
10' FL~ML.D A-ND POOL OR WILDCAT
South Middle Ground Shoal
11 SEC, T, R, M (BO~I~I'OM HOLE
OBJECTIVE~
Sec. 35, T8N, R13W, S.M.
12 PEB2VIIT N'O
68-32
"'13 RE~ORT TOTAL DEPT~-I AT END OF MONTH, CHANG~ IN HOLE SI~E, CASING A2qD CEMENTING JOBS INCLUDING DEPTH
~ET AND VOLUMES USED, PERFORATIONS, TESTS AND HESULTS, FISHING JOB//;, JUNK IN HOLE AND SIDE-TRACKED HOLE
AaxlD ANY OTHER SIGNIFICANT C'HA. NGES IN HOL~ CONDITIONS
9-29-69 - 10-1-69
PBTD 10445. Pulled tandem Kobe pump and standing valve.
Ran 48-hour BHP survey.
10-2-69 - 10-6-69
Killed well. Nippled up BOP and tested. Pulled dual tubing;
ran single string of 2-3/8" tubing and reverse circulated at
10,439. Pulled tubing and ran injection BHA. Loaded annulus
with inhibited fresh water. Nippled up wellhead and tested.
Hooked up filtered injection water to tubing, pressured to
2,000 PSI and pumped at 2 BPM. No pressure or flow on annulus.
Pumped 175 BW. Nippled down and installed tree. Waiting on
injection water.
SZGN~D r~TLE Asst. Area Admin. Supvr. DA'~ November 6~ 1969,
NOTE~'Report on this form ~s reqmred for each calendar month, regardless of the status of operat,ons, and must be filed ~n duphcate
w~th the Dwmmn of M~nes & M~nerals by the 15th of the succeeding menth, unless otherwise d~rected
Form P--S
REV 9-3047
Subrmt "Intentions" in Triplicate
& "Subsequent Reports" m Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMrrI'EE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use th~s form for proposals to drill or to deepen or plug back to a dffflerent reservoir
Use "APPLICATION FOR P~IT--" for such proposals )
OIL ~. GAB [-'-]
WELL WmLL OTHER
2 NAME OF OPEKATOR
Pan American Petroleum Corporation
3 ADDRESS OF OPERATOR
P. 0. Box 779, Anchorage, Alaslm 99501
4 LOCATION OF WELL
Ars.race Leg 2, Slot 2, SMGS Platform "D", 699' FSL,
1872' FWL, Sec. 35, TSN, R13W, S.M.
5 AP1 BT~CAL CODE
50-133- 20104 K£V .....
6 LEASE DESIGNATION AND SER~kL
. .
~ 18746 REL
? IF INDIA-~T, ,A. LL~O'I".I,'~:~: OR TftIBE NA_M]E
8 UNIT. FARi~ OR LEASE NAME
South Middle Cround Shoal
9. VFELL NO
11
10 F~T,n A/ND POOL, OR WILDCAT
South Middle Ground Shoal
11 SEC , T , R , M., (BOTT~)M
O~VE)
Sec. 35, TSN, R13W, S.M.
13 ELEVATIONS (Show whether DF, RT, GR, etc 12 PEB/VIIT i~O
RKB 100' above MSL 68-32
Check Appropriate Box To I,ndi'cate Natrure of NOtice, Re ~ort, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF t I PULL OR ALTER CASING
FRACTLRE TREAT j j MULTIPLE COMPI,ETE
SHOOT OR ACIDIZE ~ ABANDONs
REPAIR WELL CHANGE PLANS
(Other) Convert to injection well
SUBEEQUENT REPORT OF:
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT~
(Other)
NoTE: Report results of multiple completion on Well
ompletion or Recompletion Report and Log form )
15 DESCRIBE PROPOSED OR CO~fFLETED OPERATION'S (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an~
proposed work.
We plan to convert this producing well to water injection as per our application
of April 16, 1969, File: AMR-967-986.511 and state approval of April 23, 1969.
JIJLI?I
16SIGNEDI hereby certify that~,~ · ~ : (~,the fore;oin~, ~ correct TITLE
(Thi..paeeforStateKffie~W]use)/ .~ J ~
APPROVED By/~,- ._~//~~~I~ITLE
CONDITIONS OF APPROVAL, IF ANY:
Area Admin. Supervisor
DATE
DATE
See Instructions On Reverse Side
Ai~P, roved Cop~
i~eturned
7/16/69
', .
Form P--7
r SUBMIT IN DUPLIC
STATE OF ALASKA ~Se~ other
st ructions on
OIL AND GAS CONSERVATION COMMITTEE ~,,~,,~
WELL cOMPLETION OR RECOMPLETION REPORT AND LOG.*
la TYPE OF WELL: O~L ['~
',%ELL__ WELL [] DaY ['~ Other
b. TYPE OF COMPLETION:
,~Ew t~ w°n~E3 DEE~'r--I ~L~I--1 ""' I--1
~ ELL OVER EN BACK RESVR Other
2 NAME OF OPERATOR
Pan American Petrole,,m Corooration
3 ADDEESS o~ oPz~s~'Oz
P. 0. Box 779 - AnchoraKe~ Alaska 99501
~-.LOCATION OF WELL (Report location cD. ri# and in accordance with any State requ:rements)*
At surface
Le~ 2. Slot 2. SMGS Platform D; 699' FSL, 1872 FWL, Sec. 35
At Top p~od. interval ~eported below
T8N, R13W S.M.
2z~(~olf,'l ~]~, 2570' FWL, Sec. 35, T8N, R13W, S.M. '
2578' FSL, 2466' FWL, Sec. 35, T8N, R13W, S. M.
ORIGIN
5. API NUMERICAL CODE
50-133-20104
s Z~^SE D~d~k~oN AXO SEmiS NO
ADL- 18746
9. IF INDIA.H, A.LJ-~TTEE OR TI~IBE NA.M~
S. U~Wr,FAP. M OR LEASE NAME
South Middle Ground Shoal
~.L NO
11
I0. i~-i~:,.n A}]I) I~)OL, OR WILDCAT
South Middle Ground Shoal
11. SEC., T , R . M . (Bo~rOM HOLE
OBJI~-'rlVE) ~
Sec. 35, T8N, R13W, S.M.
12 PlieR.MIT 1~0.
13 DATE SP%IDDED
4-17-68
I-~W 1VIA~Y* ROTARY TOOLS
10508 H.D. 10~445 M. D. 0 - TD
22 PRODUCING I_h'r~!atVAL(S), OF ~ ~P~TIO~--~, ~M, N~E (~ AND ~)*
?32
7-10-68 8-26-68 RKB 100' above MSL J 59.4' MSL
9630 - 10~310' (md): Lower Kenai Conglomerate
TYPE ELEc'rii/C AND O'rn~t LOGS RUN
IES GR Sonic Dipmeter, Density~ Collar Locater
-- CASING RECORD (Report all ~trings set in well)
*,'20" /85 a '94 BAH-40 I 605 '; .
,,~, ~.~-_~/8". l, .~.5 Ij-55 i 2oo1'
';?~ 9-5/8", [40 &,43.5, [S-95&J 9676',.
~ I~-8° i ~,,
26 LINER
INTERVALS DRILLED BY
CABLE TOOLS
23 "WAS DIRECTIONAL
SURVEY 1W_AD E
i yes
7"[[ 94,59' 10,}02'[ 210
I
28 PEP,~OP,~TIONS OPF_~ TO PRODUc;fIOI~T (Interval, szze and number)
~9630-70, }J738-43, '9755-9805, 9870-9900, 9920
10,000, 10,010-30, 10,050-80, 10,090-110,
10,140-220, 10,240-310, all with 4 jspf
HOLE S~E CEIiL~NG RECOl%D A1VIOUNT PULLED
26" 1~0 sacks
17~" [ 1600 sa~k~
J 1150 sacks
i
30 PRODUCTION
27 TUBING I~I~COI%D
S~ (MD) SIZE I DEPTH SET (M.D) PACKER SET (MD)
3~ 9554 ' 9540 '
2~ ACID, SI-lOT, r~CI'~l~. CE~IgT S~U~, ~C
, DMI ~V~ (~) ~ &~O~7 a ~I~ OF ~~ U~
2210~2612~ . 300 sacks squeeze
2210-~12i~' 220 sacks resqueeze
2210-2612~. 250 sacks resqueeze
lype o£ purnp/ WELL
DATE FIRST Pr~oDucTION I PRODUCTION ME'ii{OD (Flowmg, gas hit, pumpmg~s~.ze and [ - ' STATUS (Produchng or
[ ~nut-m)
8-8-68 J P-mnin~- Kobe TYpe "B". 3 x 2-.t.~8 x 1-7/8 x 1~7/8 Producing
DATE OF TEST. !iKOnS T~ [J~OXE~IZE I~STJ~OD'~p~OD~OR , OI~BBL "I G~CF WA~B~ IJ G~-O~ ~O
__8-25-68, [ 24 !124/64 ] ~ J 1573 1414 J 9 1275
FLOW.~ ~BING ll~m~ ~s~ I~-aoualC~"'~ 'OI~BBL} ' o.~ W.~B~. J om o~v~-~ '(c~.)
J TEST WITNESSED BY
",Used for fuel and flared
~2. List OF ATTACHMENTS ~'
1ES Log, Directional Data (2), Core Data, Well History
"' 33 I hereb~ c~rt'lfy that the foregoing aC~,tached information is complete and correct as, determined from all-available records
-
SI~NmD --' /%~/~ ~.~ TIT~.mAsst. Area Ad'tin. Supervisor V~T~, October 17 1968
_ ' c.K. m:a~,, ~ -~, "' i '
*(See Instructions and Spaces ~or Additional Data on Reverse Side)
INSTRUCTIONS
General Th~s form is designed for submitting a complete and correct well completion report end log on
all types of lands and leases ~n Alaska ,
Item: 16: Indicate which elevahon ~s used as reference (where not otherwise shown) for depth r{'~easure-
ments given ~n other spaces on th~s form and ~n any att0chments
Items 20, and 22:: If th~s well ~s completed for separatc production from mor~e than one ~nterval zone
(multiple complehon), so state ,n ~tem 20, and ~n ~tem 22 show the prcJuc~ng ~nterval, or ~ntervals,
top(s), bottom(s) and name (s) (,f any) for only the ~nterval reported tn ~tem 30 Submit a separate report
(page] on th~s form, adequately ~denhf~ed, for each ad&tlonal tnte~val to be seperately produced, show-
~ng the ackt~t~ona) data pertinent to such ~nterval
Item26: "Sacks Cement". Attached supplemental records for th~s well should show the details of any mul-
tiple 'stage cement~n0 and the location of the cemenhng ~o61
Item 28: Submit a separate completion report on this form for each interval to be separately produced
(See Instrucl~or~ for dems 20 and 22 above)
A.I'~Y ~p i,"OR.M'ATION .l'F...~'l.h INCLUI)IN(, IN1 EI[VA~ 'r~D lq~UR~ DATA ~ ~OV~ ~Y OIL, GAS, "
WAT~ AND MUD
NA~
~CJ S~and ~n~t 5073~ 4860
Lower Kena~ Con-
glomerate 9598
DATA. A~ACI[ BRIE~ D~CRIPI~ONS OF LITHOLOGY POROSITY, FRAC~RB APP~NT DIPS
AND DETECTEI) StlOWS OF OIL, G~ OR WA~
See at~achmenc~ ~'Core Data~'
CORE DA'IA
Core #1
Core #2
Core #3
Core #4
Core #5
Core #6
Core #7
Core #8
Core #9
Core # 10
Core #11
9739-58' Sandstone, conglomerate, fair porosity, oil bearing.
9758-83' Conglomerate and sandstone, mica, poor-fair porosity,
oil bearing ~
9850-90' Conglomerate and sandstone, mica, few fractures, fair
porosity, oil bearing.
9890-9902' Conglomerate and sandstone, poor porosity, poor oil show.
9902-21' Conglomerate and sandstone, fair porosity, oil bearing.
9921-48' Conglomerate and sandstone, mica, poor-fair porosity,
oil bearing.
9948-76' Conglomerate and sandstone, mica, poor-fair porosity,
oil bearing.
9976-96' Conglomerate and sandstone, poor-fair porosity, oil bearing.
9996-10,002' Conglomerate, argill., poor porosity, spotty oil stain.
10,002-42' Sandstone and some conglomerate, mica., poor porosity,
poor oil show.
10,042-54' Conglomerate, argill., poor porosity, oil bearing.
Core #12
Core #13
Core #14
Core #15
Core #16
Core #17
Core #18
Core #19
Core #20
Core #21
Core #22
10,054-58' Conglomerate, argill., mica, t±te-poor porosity, poor
oil show.
10,058-87' Sandstone and conglomerate with thin bed siltstone,
tite-poor porosity, poor oil show.
10,087-97' Siltstone, carb., with thin bed conglomerate, tite, no show.
10,097-126' Sandstone, mica., silty, poor-fair porosity, oil bearing.
10,126-38' Sandstone and conglomerate, fair porosity, oil bearing.
10,141-167' Conglomerate and sandstone, fair-good porosity, oil bearing.
10,167-97' Sandstone and conglomerate, fair porosity, oil bearing.
10,197-216' Sandstone and conglomerate, mica., argill., poor porosity,
poor oil show.
10,216-234' Conglomerate, argill., poor porosity., very poor oil show
10,234-257' Sandstone and conglomerate, poor-fair porosity, very poor
oil show.
10,257-279' Conglomerate and sandstone, tite-poor porosity, very poor
oi 1 show.
CHRONOLOGICAL WELL HISTORY
SMGS Unit Well #11
6/22 - 7/13
7/14 - 7/20
7/21 - 7/30
7131 - 811
812
8/3- 6
817 - 13
8/14- 19
8~20
8/21
8/22- 23
8/24- 25
8~26
Spudded
Drilled 17½" hole to 630', opened to 26", and set 20" casing at 605'
with 1250 sacks.
Drilled 12~" hole 630-2030', opened to 17~", and set 13-3/8" casing
at 2001' with 1600 sacks
Temporarily Suspended
Drilled 12~" hole 2030-9684', logged, and set 9-5/8" casing at 9676'
with 1150 sacks.
Drilled and cored 9684-10,508', logged and set 7" liner 9459-10,502'
with 210 sacks. Cleaned out to 10,445'.
Ran-t~ng and packer and perforated 10,140'-220' and 10,240-310'
Installed surface Kobe equipment.
Rolled casing and set BP at 2412' with 13 sackssand above. Set ~
packer at 2210' and cemented with 300 sacks cement. Squeezed last
10 bbls at 600 psi. Instant SIP 400 psi; 15 minute SIP 50 psi.
WOC 18 hours and drilled firm cement 2244-2362'. 500 psi squeeze
broke down cement.
Set packer at 2210' and squeezed 220 sacks with final squeeze pressure
of 5000 psi. WOC 24 hours, drilled firm cement 2268-2395'. 700 psi
test pumped in. Reset packer at 2210' and squeezed 250 sacks. WOC
24 hours, drilled cement 2214-2330' and tested to 1500 psi. Drilled
cement 2330-2395' and tested 800 psi for 30 minutes. Recovered BP
and cleaned out to 10,445'.
Landed dual tubing and perforating gun stopped at 9408' at Kobe
cavity. Pulled and reran tubing and swabbed.
Temporarily 'suspended for rig to work on another well.
Landed tubing at 9572' in packer, perforated intervals between 9860'
and 10,110' and ran BHP test.
Perforated intervals between 9630' and 9960'.
Circulated and shifted packer to 9540'. Ran Kobe pump and released
rig.
Pump t~sted.
Completed as a pumping oil well.
PAN AMERICAN PETROLEUM CORPORATION
SOUTH MIDDLE GROUND SHOAL 1874~ UNIT
SOUTH ~IDDLE GROUND SHOAL
ALASKA
11
VERTICAL
JULY 17 1968
SECTION,COMPUTED
PAGE
SURVEY DATE
ALONG CLOSURE
; 4
SPERRY-SUN WELL
RECORD
SURVEYING COMPANY
OF SURVEY
SU-3-16328
MEASURED
DEPTH
~,50.
2000.
2100.
2200.
2300.
2400.
2500.
2600.
2700.
2800.
2900.
3000.
00.
3200.
3300.
TRUE
VERTICAL
DEPTH
1926.06
1974.12
2068.53
INCLINATION DIRECTION
DEG MIN DEG
SU-3-16275
16 O. N 80 E
19 15 N 82 E
DOG-LEG
SEVERITY
DEG/IO0
O.CO
3.30
2161.73 21 15 N 79 E 2.25
2255.55 20 15 N 72 E 2.67
2350.92 17 30 N 55 E 6.12
2447.16 15 45 N 49 E 2.44
2544.50 13 15 N 47 E 2.54
2641.84 13 I5 N 46 E 0.22
N 43 E
N 3i E
N 20 E
19
19
22
2739.18
2835.99
2933.02
3029.61
3124.72
3218.08
13 15
14 30
14 0
15 0
18 0
21 0
0.68
3.13
2.74
1.03
2.99
3.16
VERTICAL
SECTION
166.43
180.67
i98.01
218.15
242.04
265.20
285.i7
305.33
326.03
350.39
374.56
400.43
431.32
467.05
REC
NORTH
89.96
92.35
96.94
103.85
114.55
131.80
149.60
165.24
181.16
197.92
242.11
266.59
295.80
329.03
TANGULAR
SOUTH
CCORDINATES
EAST
WEST
245.91
259.48
292.13
327
360
385
4O5
422
438
454
467
475
.7O
.62
.25
.74
.50
.99
.b2
.52
.79
484.22
494.28
507.70
3400.
3500.
3600.
3700.
3800.
3900.
3310
3402
3493
3585
3676
3768
.13
.71
.25
.78
.31
23
23
23
23
23
23
0
15
30
45
45
45
N 22 E
N 23 E
N 23 E
N 22 E
N 22 E
N 2i E
2.00
0.46
0.24
0.47
0.00
0.40
506.01
545.31
585.01
62b.16
665.32
705.52
365
401
438
475
512
550
.26
.60
.30
.64
.99
.58
522
537
553
568
583
597
.34
.76
.34
.43
.52
..95
4000.
4100.
4200.
3859
3951
4043
.84
.37
.08
23 45
23 45
23 30
N 21.
N 22
N 21
0.00
0.40
0.47
745.72
785.88
825.68
588
625
662
.18
.53
.75
612.38
627.47
641.76
P~N AMERICAN
SOUTH MIDDLE
SOUTH MIDDLE
ALASKA
PETROLEUM CORPORATION
GROUND SHOAL 18742 UNIT
GROUND SHOAL
11
SPERRY-SUN WELL
RECORD
MEASURED
DEPTH
300.
4400,
4500.
TRUE
VERTICAL
DEPTH
4134.96
4227,18
4319.73
INCLINATION
DEG MIN
23 15
22 45
22 15
DIRECTION
DEG
N 21 E
N 20 E
N 19 E
4600.
4700.
4800.
4412
4505
4598
.28
.64
.84
22
21
21
15
0
15
N 19 E
N 17 E
N 18 E
4900.
5000.
5100.
4693
4787
4882
.11
.80
.21
19
18
19
30
45
15
N 16 E
N 16 E
N 17 E
5200.
5300.
5400.
4977
5073
5168
.84
.21
.84
17
17
17
0
3O
0
N 14
N 15
N 13
"--'500.
9600.
5700.
5264.47
5360.72
5457.31
17
15
15
0
45
0
N 12 E
N 10 E
N 9E
5800.
5900.
6000.
5554
5651
5748
.34
.37
.50
14
14
13
0
0
45
7 E
7 E
7 E
6100.
6200.
6300.
5845
5942
6039
.53
.67
.80
14
13
13
0
45
45
5 E
5 E
4 E
6400.
6500.
6600,
6136
6233
6329
.72
.32
.44
14
15
16
15
0
0
5 E
3 E
1 E
VERTICAL
JULY 17 1968
SECTION COMPUTED
PAGE 2
SURVEY DATE
ALONG CLOSURE
DO
SE
D
SURVEYING COMPANY
OF SURVEY
G-LEG
VERITY
EG/iO0
VERTICAL
SECTION
0.24
0.63
0.62
865.09
903.72
941.58
SU-3-16328
RECTANGULAR COORDINATES,,
NCRTH SOUTH EAST WEST
699.61 655.91
735.94 669.13
771.75 tx/ 681.46
0.00 979.43 807.55 693.79
1.45 1015.26 841.82 704.27
0.43 1051.51 876.29 715.47
1.88
0.74
0.59
1084.88
1117.01
1149.97
2.43
0.58
0.77
1179.15
1209.19
1238,34
0.29
1.37
0.79
1267.44
1294.34
1319.93
1.11
0.00
0.24
1343.71
1367.50
1390.86
0.54
0.24
0.23
1414.47
1437.67
1460.77
0,55
0.90
1.13
1484.79
1509.84
1536.26
908.38
939.28
970.80
999.17
1028.22
1056.71
724.67
733.53
743.17
750.24
758.02
764.60
1085.30
1112.04
1137.60
770.68
775.39
779.44
1161.61
1185.62
1209.21
782.39
785.34
788.23
1233.31
1256.99
1280.70
790.34
792.41
794.07
1305.22
1331.07
1358.63
796.22
797.57
798.05
P~N AMERICAN
SOUTH MIDDLE
SOUTH MIDDLE
ALASKA
PETROLEUM CORPORATION
GROUND SHOAL 18742 UNIT
GROUND SHOAL
11
VERTICAL
SPERRY-SUN WELL SURVEYING CCFPANY
RECORD OF SURVEY
~EASURED
DEPTH
~700.
6800.
6900.
TRUE
YERTICA
DEPTH
6425.07
6521.20
6617.44
INCLINATION
DEG MIN
17 0
16 .0
15 45
DIRECTION
DEG
N 1 W
N 2 W
N 6 W
DOG-LEG
SEVERITY
DEG/iO0
1.14
1.03
1.12
VERTICAL
SECTION
1563.97
1589.94
1614.82
7000
7100
7200
6713
6809
6905
.69
.82
.06
15 45
16 0
17 45
8 W
8 W
9 W
0.54
0.25
1.77
1639.
1664.
1691.
30
16
42
7300
7400
7500
7001.53
7099.44
7197.76
15
11
10
15
45
30
N 5 W
N 6 W
N 10 W
2.74
3.50
1.46
i715.
1734.
I750.
7I
37
52
7600
7700
7800
""7900
8000
8100
. 7296.53
. 7395.30
· 7494.00
. 7592.25
· 7690.15
· 7788.31
10
11
11
0
0
15
45
45
0
N 13 W
N 16 W
N 7W
N 3 E
N 9 E
N 9 E
1.58
0.46'
1.44
2.28
1.53
0.75
I763.
1777.
i79I.
1809.
1829.
1848.
99
02
64
69
83
69
8200
8300
8400
7886
7985
8085
.80
.76
.07
10 0 8 15
6 45
9 E
3 E
2 W
1.00
1.98
1.63
1865.
1879.
1890.
86
75
82
850O
86O0
8700
8184.56
8284.22
8383.88
5 45
4 45
4 45
N 12 W
N 20 W
N 32 W
1.47
1.23
0.99
1899.
1906.
1911.
54
10
47
8800
8900
9000
8483.60
8583.33
8683.02
4 15
4 15
4 30
N 37 W
N 48 W
N 58 W
0.63
0.81
0.80
1915.
1918.
1920.
76
82
78
JULY 17 196B
SECTION COMPUTED
PAGE 3
SURVEY DATE
ALONG CLOSURE
SU-3-16328
RECTANGULAR
NORTH SOUTH
1387.86
1415.41
1442.41
1469.29
1496.58
1526.69
1552.90
1573.15
1591.09
1606.34
1621.37
1637.33
1655.96
1676.07
1694.92
1712.07
1726.40
1738.14
1747.94
1755.72
1762.75
1768.66
1773.62
1777.78
CCORDINATES
EAST WEST
797.54
796.58
793.74
789.97
786.13
781 · 36
779.07
776.94
773.77
770.26
765.94
163.98
764.96
768.15
771.13
773.85
774.60
774.19
772.11
769.27
764.89
760.43
754.92
748.26
Z
0
PAN AMERICAN PETROLEUM CORPORATION
SOUTH PIDDLE GROUND SHOAL 18742 UNIT
SOUTH PIDDLE GROUND SHOAL
ALASKA
11
SPERRY-SUN WELL
RECORD
TRUE INCLINATION DIRECTION
MEASURED VERTICAL
DEPTH DEPTH DEG MIN DEG
VERTICAL
9100. 8782.64 5 0 N 58 W
9200. 8882.36 A 15 N 60 W
9300. 8982.02 4 45 N 68 W
9400. 9C81.38 6 30 N 66 W
9500. 9180.92 5 30 N 70 W
9600. 9280.41 5 45 N 69 W
S700. 9379.72 6 45 N 76 W
9800. 9479.26 5 30 N 68 W
9900. 9578.71 6 0 N 64 W
lO000. 9678.07 6 30 N 66 W
10100. 9776.70 9 30 N 54 W
10200. 9874.78 11 15 N 47 W
10300. 9972.01 13 30 N 42 W
10400. 1C067.77 16 45 N 43 W
**~* THE CALCULATION PRCCEDURES ARE BASED ON
HORIZONTAL DISPLACEPENT = 1969.79
SURVEYING COMPANY
OF SURVEY
DOG-LEG
SEVERITY VERTICAL
DEG/IO0 SECTION
0.49 1922.95
0.76 1924.54
0.80 1925.18
JULY 17 1968
SECTION COMPUTED
PAGE 4
SURVEY DATE
ALONG CLOSURE
SU-3-16328
RECTANGULAR COORDI
NORTH SOUTH EAS
1782.40 740.8
1786.11 734.4
1789.21 ~ 726.7
1.76 1926.44 1793.81
1.08 1926.84 1797.09
0.26 1927.44 1800.68
1.25 1926.71 1803.52
1.51 1927.44 1807.11
0.64 1928.97 1811.70
0.54 1930.24 1816.30
3.41 1935.45 1R26.00
2.15 1943.82 1839.31
2.49 1955.64
3.26 1969.79
THE USE OF THE
FEET AT NORTH
NAIES
T WEST
716.44
707.43
698.08
686 · 67
677.7e
658.05
630.43
1856.66 ' 614.8
1877.73 595.1
TANGENTIAL OR CHORD HETH
17 DEG. 35 kiN. EAST(TRUE)
l'~rm No P--4
REV 9-~4~.~
,
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUBMIT IN DUPLICATg
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
r5 AP1 NLrNiEKICAL CODE
50-133-20104
6 LEASE D~iGNA~ON AND S~IAL NO
ADL - 18746
1 T IF INDIA)X, ALOT IE~ OR TRIBE NAME
O,L [~ GA8 F-~ OTHER
WKLL WELL
2 N~E OF OP~R 8 L~IT,F.~I OR LEASE
Pan American Petroleum Corporation S~GS Unit
9 xv~ NO
3 ADDR~S O~ OPEP..A. TOR
P. O. Box 779 - Anchora~e~ Alaska 99501
4 LOCA~N OF WELL
Leg 2, Slot 2, SMGS Platform 'D'; 699' FSL,
1872' FWL, Section 35, T8N, R13W, S.M.
11
I0 F}~:}.~ A_ND PC)OL OR WILDCAT
South Middle Ground Shoal
n s~c. ?. R, ~ mO~OX~ HO=
Sec. 35, T8N, R13W, S.M.
12 PERMIT NO
68-32
13 REPORT TOTAL DEPTH AT END OF MONTH, CI-I3kNGES IN HOLE SIZE. CASING A_ND CE!ViENTING JOBS INCLUDING DEPTH
SET AND VOLUiViES USED, PERFORATIONS. TESTS A.N/) RESULTS. FISHING JOBS. JUNK iN HOLE AND SIDE-TRACE.ED HOLE
A3qT) A_NY OTI-I~R SIGNIFICA/~r CHA/NTGES iN HO~ CONDITIONS
8/26
- PBTD 10,445'. Completed as a pumping oil well.
8/i
8/2
8/3-6
8/7-13
8/14-19
s/2o
8/21
8/22-23
8/24-25
Rolled casing and set BP at 2412' with 13 sx sand above. Set
packer at 2210' and cemented with 300 sx cement. Squeezed last
10 bbls at 600 psi. Instant SIP 400 psi; 15 minute SIP 50 psi.
WOC 18 hours and drilled firm cement 2244-2362'. 500 psi squeeze
broke down cement.
Set packer at 2210' and squeezed 220 sx with final squeeze pres-
sure of 5000 psi. WOC 24 hours, drilled firm cement 2268-2395'.
700 psi test pumped in. Reset packer at 2210' and squeezed 250 sx.
WOC 24 hours, drilled cement 2214-2330' and tested to 1500 psi.
Drilled cement 2330-2395' and tested 800 psi for 30 minutes.
Recovered BP and cleaned out to 10,448'.
Landed dual tubing and perforating gun stopped at 9408' at Kobe
cavity. Pulled and reran tubing and swabbed.
Temporarily suspended for rig to work on another well.
Landed tubing at 9572' in packer, perforated intervals between
9860' and 10,110' and ran BHP test.
Perforated intervals between 9630' and 9960'.
Circulated and shifted packer to 9540'. Ran Kobe pump and
released rig.
Pump tested.
~4 i hereby certl£y that ~reg~g~ c~rrect
mGN~D ~ . ~TL~ASst. Area Admin. Supvr. DA~ 9-12-68
N01E~Report on thru form eqmred for each calendar month, r e~ardle~ of the ~tatu~ o~ o~eraUon% an~ mu,t ~ flle~ m duphcat~
w,th the Dtvmon of M~nes & M~nerals by the 15th of the succeed,ng month, unless othe~,se d~rected
Form No P--4
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUBMIT IN DUPLICATE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
2 NAME OF OP~tA. TOR
Pan American Petroleum Corporation
3 ADDRESS OF OPERATOR
P. 0. Box 779 - Anchorage, Alaska 99501
4 LOCATION OF WTM
Leg 2, Slot 2, SMGS Platform 'D'; 699' FSI.,
1872' ~WI., Section 35, TSN, R13W, SoM.
AP1 NL~IEHICAL ~ODE
50-133- 20104
LEASE DESiGN'Ai'ION AND SE-~IAL NO
AD1- 18746
IF INDIA]~, ALOTTEE OR TRIBE HAME
8 L,~IT,F.M~I OR LEASE NaME
SMGS Unit
9 WELL NO
11
10 FIF~ A_%ID POOL OR WILDC~kT
South Middle Ground Shoal
11 SEC , T . R, M (BO'I'FOM HOLE
om,rr, c--rn~
Sec. 35, T8N, R13W, S.M.
12 PERMIT NO
68-32
/
13 REPORT TOTAL DEPTH AT END OF MONTH, CH.A-N'GES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PEP,,FOH. ATIONS, TESTS A/N-D HESULTS FISHING JOBS, JUNK IN HOLE A.ND SIDE-TRACKED HOLE
AND ANY O'I~IER SIGNIFICANT CH. ANGES IN HOI.~ CONDITIONS
7/31
PBTD 10,448'. Preparing to repair split in 9-5/8" casing
at 2329'.
7/1-13
7/14-20
7/21-30
Drilled and cored 8-5/8" hole 10~002-1q, 508', logged and
set 7" liner 9459-10,502' with 210 sx. Cleaned out to
10,448'.
Ran tubing and packer and perforated 10,140-220',
10,240-310'.
Installed surface Kobe equipment.
14 I hereby ce~ th~~~rrect '
S~GN~D . · ~, 'n'n.z Asst. Area Admin. Supvr. DATE 8-8-68
NOTl:--Report on this form m ~mred for each calendar month, regardless of the status of ol~erauon$, an~ must ~ f~e{I m duphcate
with the Diw$1on of Mines & Minerals by the 15th of the succeeding month~ unless otherwise d~rected
Form No P--4
REV 9-30-6';
STATE OF ALASKA
O]L AND GAS CONSERVATION COMMII-I'EE
SUB.%IIT L~q DIgPLICATE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
OIL ~ GAB ~
WELL ~ WELL ---J OTHER
2 NAME OF OP]~TOR
Pan .american Petroleum Corporation
3 ADDRESS OF OPERATOR
P 0 Box 779- Anchorage, Alaska 99501
4 LOCATION OF WELL
Leg 2, Slot 2, SMGS Platform 'D'; 699' FSL,
1872' FWL, Section 35, T8N, R13W, S.M.
AP1 NL~.IERICAL CODE
50-133- 20104
6 LEASE DESiGNAYION A\'D SERIAL
ADL- 18746
IF INDi AN %LOT,-I'EE OR TRIBE NAAIE
8 L.~X'IT, F.kl~_M OR LE &SE N
SMGS Unit
9 WELL NO
11
10 FI~-I.~ A_\'D POOL OR %% ILDCAT
South Middle Ground Shoal
11 SEC, T, R, M t BOT'TO.'%I HOI_,E
OBJEC~IV'E ~
Sec. 35, T8N, R13W, S.M.
12 P]~qlVIIT NO
68-32
13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SI~E, CASING ANT) C~VIENTING JOBS INCLUDING DEPTH
SET A_N'D VOLLrMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK LNT HOLE AND SIDE-TRACKED HOLE
AND AllY OTHER SIGNIFICANT CHANG~ IN HOI.~ CONDITIONS
6/30
6/1-21
6/22-30
TD 10,002' Coring.
Drilled 12-1/4" hole 7171-9684'
casing at 9676' with 1150 sx.
Cored 9739-10,002'.
, logged and set 9-5'/8"
RECEIVED
JUL 15 1968
DIVISION OF MINES & MINERALS
ANCHORAGE
14 I hereby ee~~ ct
SIGNED ~ TITLmAss't. Area Admin. Supvr. DA'I/ 7-10-68
NOTE--Report on this form ~s tared for each calendar month, regardless of the status of operat,ons, and must be filed m duphcate
w~th the D~ws~on of Mines & Minerals by the 15th of the succeeding month, unless otherwIse d~rected
Form No P--4
HEV 9-30-6;
(
STATE OF ALASKA
O]L AND GAS CONSERVATION COMMITTEE
SUBMIT k~ DE~LICATE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
W~'LL ~ WZLL
NA_ME OF OP~ATOR
Pan American Petroleum Corporation
ADDRESS OF oPm~roa
P. 0. Box 779 - Anchorage, Alaska 99501
LOCATION &F WmTJT.
Leg 2, Slot 2, SMGS Platform 'D'; 699' FSL,
1872' FWL, Section 35, TSN, R13W, S.M.
AP1 NL-AIERICA_L CODE
50-133-20104
LE~SE DESiGNAilON' A\-D SERIAL XO
ADL- 18746
IF INDi ~X %LOTTEE OR TRIBE NAME
8 L--NIT,F.a.i:L.M OR LEASE N
SMGS Unit
9 WELL NO
11
10 FIEJ~D AND POOL OR WILDCAT
South Middle Ground Shoal
11 SEC T R, M ~BO'I~I'O.M HOLE
OBJECTrVE ~
Sec. 35, TSN, R13W, S.M.
12 PER2vlIT NO
68-32
13 REPORT TOTAL DKPTH AT END OF MONTH, CI-I.A-NGES IN HOLE SI~.E, CASING AND CEi~IENTING JOBS INCLUDING DEPTH
SET AND VOLLrMt~ USED, PER~ORATIONS, TESTS AND RESULTS, FISHING JOBI$, JLrNK IN HOLE AND SIDE-TI:LACKED HOLE
AND ANY OTHER SIGNIFICANT CHAIN'G-ES IN HOL~ CONDITIONS
5/31 TD 7171'. Drilling.
5/1-18 TD 2030'. Temporarily suspended.
5/19-31 Moved drilling rig on and drilled 12-1/4" hole 2030-7171'
DIVISION OF ~INES
ANCHORAGE
·
14 I hereby
SIGNED T~TLEAs s ' t .Area Admin. Supvr. mA'am: 6-11- 68
NOTE--Report on th~s form ;s r~red for each calendar month, regardless of the status of operat,ons, ancl must be fflea m duphcate
wfth the D~wsmn of Mines & Mmeral~ by the 15th of the succeeding month, unless otherwise dfrected
l%rm No P---4
~ 9-30-6';
STATE OF ALASKA
SUBMIT 1/~ DEPLICATE
~ APl NL~,.IEHIC.%L CODE
O~L AND GAS CONSERVATION COMMITTEE 50-133-20104
MONTHLY REPORT OF DRILLING ~ L~,SE OES:G.','A~ION A',-O S~IAL ~o
~- 187~6
AND WORKOVER OPERATIONS
T IF I~Di eX k~T~E O~ TRIBE
0IL ~ GAB
WELL~ WELL ~ OTHER
N~E OF OP~TOR 8 L~'IT,F.~M OR LEASE N.~ME
Pan ~erican Petroleum Corporation S~GS Unit
ADDR~S OF OPhiR 9 %VE~ NO
P. 0. Box 779- Anchorage, Alaska 99501 11
~CA~ON OF w~ 10 Fr~D ~ND ~L OR WILDCAT
South Middle Ground Shoal
11 SEC, T, R M ~BOT'FOM HOLE
OBJECTIVE ~
Sec. 35, T8N, R13W, S.M.
12 P]/IB2VIITNO
68-32
Leg 2, Slot 2, SMGS Platform 'D'; 699' FSL,
1872' FWL, Section 35, T8N, R13W, S.M
13 REPORT TOTAL DEPTH AT END OF MONTH, CH.A~GES IN HOLE SI~E, CASING A_N'D CEMENTING JOBS INCLUDING DEPTH
SET A_N'D VOL~ USED, PERFORATIONS, TESTS A_ND RESULTS, FISHING JOBS, JUNK Id~' HOLE A_ND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CI-IANGES IN HOI..~ COI~DITIONS
4/24
4/17
4/18-19
4/20-23
4/24-29
TD 2030'. Temporarily suspended.
Spudded from surface with workover rig.
Drilled 12-1/4" hole to 630', opened to 26" and set 20"
casing at 605' with 1250 sx.
Drilled 17-1/2" hole to 2030' and set 13-3/8" casing at
2001' with 1600 sx.
Moved off workover rig and temporarily suspended.
14 I hereby certify thai the forfgomgys .true ~ correct
s~amm ~'/~,~~ UTn~Ass't. Area Admin. Supvr.DA.~, 5/7/68
NOTE--Report on th~s form ~s required for each calendar month, regardless of the status of operaUons, and must be fdecl m duplicate
w~th the D~ws~on of Mmes & M~nerals by the 15th of the succeedmg month, unless otherwise d~rected
FORM 470 2-57
o. RECEIVED
Anchorage, Alaska 99501
April 18, 1968 APR ~ :~ lg$1l
DIVISION
OF
~N~S &
File: FliK- 498-WF
Re:
Spud New Well -
SMGS Unit No. 11
Director
Division of Lands
Department of Natural Resources
State of Alaska
344 Sixth Avenue
Anchorage, Alaska
Dear Sir:
This is to notify you that the subject well was spudded on
State Lease ADL-18746 at 1400 hours on 4/17/68. The surface lo-
cation of this well is at SE/4 SW/4, Section 35, TSN, R13W, S.M.
We plan to drill this well directionally to a bottom hole
location of NW/4 SE/4, Section 35, T8N, R13W, S.M.
Yours very truly,
F. K. ~rebill
Area Superintendent
April 18, 1968
l~e: Sou~b ~Lddle Crom,l Shoal
~rator
~'. O. aox779
~or~, ~ 99501
Eue~oaed pieaae f~d tim ipprav~ app:Lteatton for
to tirol! t~ referenced yell. ~bl! smpl~o and core eJLtp, ere
not req~trod o
Very truly youros
ILar1 L. VouderAhe
aer~ns ~atro~eum guperv~
~V:my
i~cl~oure
FORM SA - I B
125.5M 8/67
MEMORANDUM
State of Alaska
TO:!--
Di'reetor
FROM:
DATE :
SUBJECT:
South ~ddle Gro~ ,,~oal il!
Operator
i~ ~'t~e ~mtn~ ot ~50,00 ~o~ fila. tee:.
FORM SA - i B
125.5M 8/67
MEMORANDUM
State of Alaska
TO:I-
FROM:
DATE :
SUBJECT:
~th ~ddle Cro~u~ ~uoal ill
Pan Ame~ica~ P~Zrol.eu~ Co~ration,
Form
~ 9°30-6';
SUBMIT IN TRIP(' TE
(Other instructions o,~
reverse side)
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK
TYPE OF WORK
DRILL [k-I DEEPEN [-] PLUG BACK [--J
01L ~] OAS r~ 8INGLE {'---I M[ITIPLE ~_~
WELL WELL OTHER ZONE ZONE
2 NAME OF OPERATOR
Pan American Petroleum Corporation
3 ADDREC~ O~ OPEH.~TOR
P. O. Box 779 - Anchorage, Alaska 99501
4 LOCATION OF WELL At surface
699' FSL, 1872' FWL, Section 35, T8N, R13W, S.M.
At proposed prod zone
2140' FSL, 2140' FEL, Section 35, T8N, R13W, S.M.
API 50-133-20104
5.
6. LF~ASE DESIGNATION Ad%rD SE/~LAL NO
/~L- 18746
IF INDIAN, ALLO'i-r~ OR ~ NAME
8 UNIT. FARM OR LEASE NAME
SMGS Unit
9 WELL NO
11
10 FIELD AND POOL, OR WILDCAT
South Middle Ground Shoal
11 SEC , T , R , M , (BOTTOM
HOLE OBJECTIVE)
Sec. 35, T8N, R13W, S.M.
13 DISTANCE IN MILES AND DIRECT.~ON FAOM NEAREST TOWN OR POST OFFICE* 12
15-1/2 miles NNW of Kenai, Alaska
14 BOND INFORMATION
Blanket bond in force
TYPE Surety and/or No
15 DISTANCE FROM PROPOSED*
LOCATION TO NEAREST 3140.'. from North
PROPERTY OR LEASE LINE, FT or west line oi
(Also tO nearest drlg, unit, if any) A'DT. - ] RT/,~
18 DISTANCE FROM PROPOSED LOCATION*
TO NEAREST WELL DRILLING, COMPLETED,
OR APPLIED FOR, FT
1646' E of b~C~ Unit ~)10
21 ELEVATIONS (Show whether DF, RT, CR, etc )
RKB 100 ' above MSL
16 NO. OF ACRES IN LEASE
4160
AZ~O, mt
19 PROPOSED DEPTH
11~000'
I? NO ACRES ASSIGNED
TO THiS WELL
80
20 ROTARY OR CABLE TOOLS
Rotary
~ APPROX DATE WORK WILL START*
April 20, 1968
23 PROPOSED CASING AND CEMENTING PROGRAM
i
SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRAI~E S]~FTING DEPTH QUANTITY 0F CEMEN~
26" 20" 85~) & 94~) B&H-40 600' Circulate to surface
17-1/2" 13-3/8" 54.5-~) J-55 2000' Circulate to surface
] ?- 1 /l" q- ~/R" APW~ & A3. M~ S- 95 11000 ' Minim:_,.m 500 Sx. ,
& N-gO
1. Deviation required to reach BHL from permanent platform.
2. There are no affected operators.
3. BOP specifications attached.
4. Intervals of interest will be perforated and may be stimulated.
IN ABOVE SPACE DESCRIBE PROPOSED PROGRA2Vi If proposal is to deepen or plug back, g~ve data on present productive zone and
proposed new productive zone If pro,posal ~s to drill or deepen d~rect_onally, gzve pertinent data on s~bsurface l~mtwns and measu~(t and
true vertical depths G~ve blow~ut preventer program
24 I hereby c~~t y~mg ~e. and C_~orrect~/~/ ~-'~
SIGNED , ' ~)~-~ DA~ - April 15, 1968
(This space for S~te ~~ { ~ ~/ [~ CONDI~ONS OF ~PROV~, IF A~:
~_mAss't.Area Admin. Supvr.
DIRECTIONAL SURVEY
b~ YES
PERMIT NO_
tA P I NTJMERICAL CODE
APPROVAL DATE
'-:"- /
/
//
/
///
.~ iii
~ ill [
1765'
SEWARD MERIDIAN
I i
I
TSN
ALASKA T 7 N
i
SCALE' I"= I000' 2
'"25
I
LEG NO. I LEG NO 2 LEGNO ;5 LEG NO. 4
LAT 60044' 08.16" LAT 60o44' 0772" . LAT 60,° 44' 0708" LAT 60° 44' 0752"
LONG 151050'4585'' LONG 151°$0'd,478'' I_ONG 151030'4586'' LONG 151° 30' 46 94"
Y = ,?.,463,917 Y = 2,46:5,871 Y = 2,465)807 Y = 2,463)855
X = 229,266 X = 229,3,19 X = 229,263 X = 229,211
FROM S W COR FROM SW COR FROM S W COB FROM S W COB
745' NORTH 8' 699' NORTH ~ 653' NORTH 8, 678' NORTH
1818' EAST 1872' EAST 1818' EAST 1765' EAST
CERTIFICATE OF SURVEYOR
I hereby certify that ! am properly registered end I~censed
to practice land surveying in the State of Alaska and
that th~s plat represents a rocat~on survey made by me
or under my supervision end tho! oll d~mens~ons and
other details ere correcf.
Dote ' Surv~'yor ~
SURVEYORS NOTE
II il
The Iocot~on of S.M.G S. Plotform D wos accomplished
"Co
by use of U.S C & G.S stations st", "East Fore,and
Light",and "Boulder" and C.E.T. 18 (Offset 2)
FINAL PLAT OF
S.M.G.S. PLATFORM "D"
LOCATED IN
I/4 SW t/4, PROTRACTED SEC 35, T 8N,RISW,S M
SURVEYED FOR
PAN AMERICAN PETROLEUM CORP.
BO. BOX 779 ANCHORAGEs ALASKA
SURVEYED BY
E M. LINDSEY & ASSOC.
LAND SURVEYORS 8~ CIVIL ENGINEERS
3201 ARCTIC BLVO
ANCHORAGE, ALAS KA
S~s
~q
b
--+----Pipe Rams
2" Check Vaive
Spool
2"Plu~.~' '~
2" Plug or Ga~e Valve
.
side outlet
Zquipment below this
furnished by Pan A.m.
p~ug v~ ive
4" line w/shop
made s::,2ep x:/no
lank
~-~------ " i ne
' O~I
2" plug valve
~ ~ 2" line
!" choke
i. All preventors ~o be hydraulically operoted from an accumulator which x,i]i open and
close hydrll a~ teas~ ~hree ~imes'wi~houa recharging.
2. All equipment thru which bit must pass to have at least as large ID as casing being
drglied ' ° ,' .
3. Kelly cock to be on Kelly from ~iAile Of Spud.
4. Drill pipe safety valve equivalent to Sheller' ~fod. 55 or OMSCO, ~:ith proper connections,
~o b~. on rig floor at all r_imes.
5. All equipment m2~tione~ above lifo be 5000~-~ WP or stronger.
6. All connections to be flanged.
7. Operating manifold to be in easy reach of drillers station w/l remote operating