Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout168-0321a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: _0 Service Stratigraphic Test 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: Top of Productive Interval: 9. Ref Elevations: KB: 17. Field / Pool(s): GL: N/A BF: N/A Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y- Zone- 4 TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y- Zone- 4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 92' (ft MSL) 22.Logs Obtained: N/A 23. BOTTOM 20"604 13-3/8" J-55 1,977 9-5/8" S-95 & N-80 9,357 7" S-95 10,168 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MCF: Test Period Casing Press: Calculated Gas-MCF: Oil Gravity - API (corr): Press. 24-Hour Rate If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date perf'd or liner run): ACID, FRACTURE, CEMENT SQUEEZE, ETC. CASING, LINER AND CEMENTING RECORD List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, TUBING RECORD 10,120 / 9,798 9,310 10,106 2-7/8" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Hilcorp Alaska, LLC WAG Gas 6/8/2023 168-032 / 322-602 50-733-20104-00-00 S MGS Unit 11 ADL0018746 696' FSL, 1876' FWL, Sec 35, T8N, R13W, SM, AK N/A 4/17/1968 10,508 / 10,174 (LS) Surface (SS) 2' / 2' 100' 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 229322.8215 2463868.3185 N/A 2585' FSL, 2459' FWL, Sec 35, T8N, R13W, SM, AK CASING WT. PER FT.GRADE 7/10/1968 CEMENTING RECORD N/A N/A SETTING DEPTH TVD 2465742.9158 TOP HOLE SIZE AMOUNT PULLED N/A 229947.0323 TOP SETTING DEPTH MD suspension, or abandonment; or within 90 days of acquisition of the log, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page only if necessary. N/A BOTTOM SIZE DEPTH SET (MD) 9,320 / 9,003 PACKER SET (MD/TVD) 3-1/2" Surf 23 Surf 9,429 2,001Surf Surf 43.5 & 40 10,502 Surf 9,111 85 & 95 54.5 605 Surf 9,676 N/A N/A Gas-Oil Ratio:Choke Size: Per 20 AAC 25.283 (i)(2) attach electronic information Sr Res EngSr Pet GeoSr Pet Eng Middle Ground Shoal / MGS Oil N/A Oil-Bbl: Water-Bbl: Water-Bbl: PRODUCTION TEST N/A Date of Test: Oil-Bbl: Flow Tubing Form 10-407 Revised 10/2022 Due within 30 days of Completion, Suspension, or Abandonment By Grace Christianson at 11:38 am, Jun 29, 2023 Abandoned 6/8/2023 JSB RBDMS JSB 062923 xGBJM 8/10/23 DSR-7/19/23 Conventional Core(s): Yes No Sidewall Cores: 30. MD TVD N/A N/A N/A N/A Top of Productive Interval N/A N/A N/A N/A 31. List of Attachments: Wellbore schematic, Well operations summary 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Aras Worthington Digital Signature with Date:Contact Email:Aras.Worthington@hilcorp.com Contact Phone: 907 564-4763 Operations Manager General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: Yes No Well tested? Yes No 28. CORE DATA If Yes, list intervals and formations tested, briefly summarizing test results for each. Attach separate pages if needed and submit detailed test info including reports and Excel or ASCII tables per 20 AAC 25.071. NAME Permafrost - Top Permafrost - Base 29. GEOLOGIC MARKERS and POOL BOUNDARIES: (list all encountered) FORMATION TESTS INSTRUCTIONS Formation Name at TD: If Yes, list formations and intervals cored (MD/TVD, From/To), and briefly summarize lithology and presence of oil, gas or water (submit separate pages if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071 no matter when acquired. Authorized Title: Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, as-built, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Authorized Name and Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment; or 90 days after log acquisition, whichever occurs first. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a current well schematic diagram with each 10-407. Submit 10-407 and attachments in PDF format to aogcc.permitting@alaska.gov. All laboratory analytical reports from a well must be submitted to the AOGCC, no matter when the analyses are conducted per 20 AAC 25.071. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. TPI (Top of Producing Interval). Form 10-407 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Digitally signed by Dan Marlowe (1267) DN: cn=Dan Marlowe (1267) Date: 2023.06.29 11:24:47 - 08'00' Dan Marlowe (1267) Updated by JLL 06/22/23 Dillon Platform Di-11 Dillon Platform Well DI-11 Last Completed 1/18/81 Oil Well>Injector Dual String Jewelry Detail # Depth (RKB) Length ID OD Item Long String 1 33’ 1.0’ Cameron Type DC-B Tubing Hanger 2 9,272’ 3-1/2” Butt Tubing 3 9,273’ 1.12’ 2.750” Baker F Seating nipple 4 9,306’ 1.20’ 3-1/2” x 2-7/8” Butt crossover 5 9,312’ 1.50’ 8.125” Baker Parallel Flowhead 6 9,320’ 2.10’ 6.00” Baker Model F-1 Packer w/6” Bore 7 9,320’ 4.875” 6.00” Baker seal assembly 8 9,320’ Seal locator, sub, 6” Baker 9 10,105’ 1.05’ 2.25 Baker Model F seating nipple 10 10,106’ 1.17’ XO 2 7/8” EUE to 2 7/8” pin w/collar 11 10,107’ 0.94’ 3.00 Baker G-22 Locator (turned down to 4” OD 12 10,120’ 1.87’ 4.00” Baker Model 7”, F-1 Packer 13 10,127’ 20.45’ 3.00” 4.00” Seal assembly 14 10,128’ 0.8’ Bull nose shear out sub Short String A 33’ 1.0’ Cameron Type DC-B Tubing Hanger B 9,308’ 1.13’ 3-1/2” x 2-7/8” Butt crossover C 9,271’ 1.15’ 2.197” Baker F-seating nipple Fish Details: # Date Comments Fish 1 06/02/82 Eline Fish in long string @9938’: spent gun and 9700’ of 7/32” EL. Fish 2 05/01/02 Pollard left tool string stuck @2442’SLM in LS, Go Devil and two cutter bars on top. Wire cut and recovered 1250’ of wire, 1192’ of .125 wire and BHA, top of wire left in hole unknown. Fish 3 10/09/2022 SL toolstring and D&D Holefinder stuck in SS @ 9200’ SLM (suspect split tubing @ bottom) Casing and Tubing Detail Size Type Wt/ Grade Top Btm CONN / ID Cement / Other 20” Conductor 85 & 95# Surface 605 Vetco 1250 sx, Cmt at surface 13-3/8” Surface 54.5#, J-55 Surface 2,001’ 19.3° ST&C / 12.615” 1600 sx (328bbls), CBL TOC = 940’, (940’ to surface has 50% bond) 9-5/8” Intermediate 43.5#, S95,40#, N80 Surface 9,676 8RD / 8.755”, Butt / 8.835” 1150 sxs, Calc TOC = 7712’ (20% washout) 7” Liner 23#, S-95 9,429’ 10,502 ’8RD / 6.366”180 sxs, Calc TOC = 9812’ (20% washout) Tubing 3-1/2” Production 9.2#, N-80 33’ 9,306’Butt / 2.992”Long String 33’ 9,308’ Short String 2-7/8” Production 6.4#, N-80 9,306’ 10,106’Butt / 2.441”Long String 9,308’ 9,310’ Short String TD =10,508’ PBTD = 10,448’ MAX HOLE ANGLE = 23.8O @ 3,700’MD 1 13-3/8” @ 2,001’ Perfs 10,140’- 10,310’ Perfs 9920’-10,110’ RT-THF: 33’ KB 7” @ 10,502’ 9-5/8” @ 9,676’ Sqzd 9-5/8” csg hole @ 2330’ G&G OIL TOP 9,625’ MD TOC Tagged @ 30’ CBL = 940’ (above 940’ ~50% bond) A 3 4 5 TOL 9,429’ 8 2 B C Pkr @ 10,120’ 7 Pkr @ 9,320’ 9 Calc TOC 9812’ Calc TOC: 7712’ 1110 13 14 20” @ 605’ ADL: 18746 PTD: 168-032 Leg 2, Slot 2 API: 50-733-20104-00 Notes: x 1974 & 1981 – Squeeze casing holes at 2330’, tested after resqueezed to 1500 psi, bled to 500 psi in 15 min. x Failed MIT in 1986. Casing would not hold pressure over 1250 psi. x LS: no runs since tool stuck in 2002. A1 Cement Plug #3: OOA: Cemented to surface, squeezed from 530’ MD OA: 530’ MD to surface IA: 530’ MD to surface LS: 500’ MD to surface SS: 530’ MD to 2’ MD Cement plug #1: IA: 9074’ to ~7000’ MD (Est’d) SS: 9074’ to 6718’ MD (Tag 10/23/22) LS: 9074’ to ~7000’ MD (Est’d) 33333333333333333333333333333333 22222222222222222222 Cement plug #2: IA: 3000’ to 895’ (Est.) MD SS: 3000’ to 1,048’ MD (Tag 5/27/23) LS: 3000’ to 594’ MD (Tag 6/1/23) Rig Start Date End Date SL / Cmt Pump 10/21/22 6/21/23 Daily Operations: Hilcorp Alaska, LLC Well Operations Summary API Number Well Permit NumberWell Name S MGS Unit 11 50-733-20104-00-00 168-032 11/04/22 - Friday 10/21/22 - Friday 10/22/22 - Saturday PJSM, R/U circulating lines, check circ. paths SS t/LS, SS t/IA good. Mix & pump 50 bbls Mud flush down SS up IA. Pump 443bbls 9.8 brine down SS out IA. R/U, inject displacement fluids Down Di-17 PTSM, Cont. inject displacement from Di09 cmt job. While pumping had a leak on fluid end of pump, troubleshoot & repair same & test good. Build 65 bbls 9.8 Brine for cmt job. R/U pump lines, build mix water. PJSM. HCU pump 5 bbls water, P/T lines t/5000 good, open & pump 79 bbls 14ppg class G cmt down SS taking returns up LS, hold 200-400psi, backpressure. Continue pumping down SS taking returns up IA, (144bbls total ) launch wiper ball & chase w/43bbls 9.8 brine taking returns up IA, then swap taking returns up LS while pumping remaining 18bbls 9.8 brine. Shut down monitor & shut in well. Had full displacement from pumping job. 10/23/22 - Sunday R/U W/L with 2 1/4" bailer. PT lubricator t/2500psi good, RIH tag cmt at 6718'. Tag witnessed by AOGCC inspector Brian Bixby. POOH R/d W/L for leg move. Secure well. No Recovery CMIT LSxSS with state inspector Guy Cook witnessing Pre Test 8psi Initial 2753psi 15mins 2724psi 30mins 2701psi 11/06/22 - Sunday R/u E/L, M/u 1.69" weight bar, 2.16" CCL and 2" 60deg perf gun. RIH tagged @ 1,140'elm. POOH L/d Gun and CCL, reconfigured tool string. RIH w/1.69" x2 wt bars, 1.69" CCL. RIH w/tagged 1140' W/t and stuck at 1143'elm. Cont working and pulled wire out of the rope socket. POOH with wire and confirmed pulling out of the head. Lost tool detail, Rope socket (1" fish neck), weight bars x2, CCL (max OD 1.69", AOL 12.6'). Found EL R/u on LS, R/d and moved to SS, Re-head and R/u EL on SS, RIH w/1.69" 2" 60deg phase perf gun and perforated SS, LS and 9-5/8" @ 3000- 06'. POOH confirmed all shots fired, R/d EL. Released EL crew. R/u Circ eq. Verified circulation down SS up IA @ 3bpm/500psi, Verified circulation down SS up LS @ 3bpm/600psi. R/d circulation eq. RIH tag cmt at 6718'. pump 79 bbls 14ppg class G cmt down SS taking returns up LS Continue pumping down SS taking returns up IA, (144bbls total ) launch wiper ball & chase w/43bbls 9.8 brine taking returns up IA, then swap taking returns up LS while pumping remaining 18bbls 9.8 brine Verified circulation down SS up IA @ 3bpm/500psi, Verified circulation down SS up LS @ 3bpm/600psi. Tag witnessed by AOGCC inspector Brian Bixby. moved to SS, perforated SS, LS and 9-5/8" @ 3000- 06' Cement job pumped according to plan in sundry. -bjm RIH w/tagged 1140' W/t and stuck at 1143'elm CMIT LSxSS with state inspector Guy Cook witnessing Rig Start Date End Date SL / Cmt Pump 10/21/22 6/21/23 Daily Operations: Hilcorp Alaska, LLC Well Operations Summary API Number Well Permit NumberWell Name S MGS Unit 11 50-733-20104-00-00 168-032 05/19/2023 - Friday Finish up DI-16. Rig up cement package, make up KCL water, spot cuttings bin to receive cement returns, mix gel, prepare to cement in am. 05/27/2023 - Saturday 05/20/2023 - Saturday Safety Meeting- Cementing and Injecting fluid downhole. Mix Spacer, line cuttings tank get ready for cement returns. Safety Meeting- Cementing operations. Test lines to 2200, found leak on SS crown valve, remove valve install blank, retest to 2200, good test. Start displacing down SS, up LS with 9.8 brine, Pump 20 bbl. got returns @ 18 bbl. Swap to pump down LS up SS pumped 21 bbl. pressure climbed to 1700. Stop pumping discuss job with Aras. Swap to Pump down SS up LS Pump 12 bbl. got returns @ 8 bbl. 500 psi on pump truck. Pump down SS out IA, to ensure we can still pump without high pressure. Well took 18 bbl to fill from SS to LS to displace freeze protect. Start pumping 10 bbl. 9.8# spacer down SS in IA, follow with 130 bbl 14 ppg Class A +4% FCG+.3%FFL, close IA, switch from IA to pump out LS. Pump 57 bbl, drop wiper ball displace with 9 bbl. of 9.8 brine, with 480 psi on cement pump. Total cement pumped 187 bbl. Est cement top in IA 895', Est top of LS 1390', Total cement loss while pumping out LS- 47 bbl. behind LS. Well took 7.5 bbls of spacer to get returns back. Close all wellhead valve, open block valves to wash cement from lines. 05/21/2023 - Sunday Safety Meeting- Injecting well fluids, working with crane. Rig down cement lines, move to North Corner, rig up to Inject well fluid from DI-11 into DI-17. Safety Meeting -Injecting into well, Inject 201 bbl. well fliud from DI-11 into DI-17, 2200 on IA, 2200 on LS 1.4 bpm. R/U E-line on LS. P/U tool string= FN, weight bar, swivel, CCL, 2" sample bailer = 12' CCL to end of tool string=4', RIH tag @ 594' CCL = 598'. Pick up & re-tag same, POOH, recovered small amount of cmt from bailer. R/D e-line. 06/01/2023 - Thursday Run in the SS with E line, tag bottom @ 1048', attempt to get cement sample, POOH no sample came back, to Pressure test, Rig up to test LS/SS @ 1625 starting psi 2761 @ 1640- 2546 psi = 215 psi loss, @ 1640 to 1655 pressure went from 2546 psi to 2428 psi =118 loss, wait on further instruction. Move back to DI-16 to set charges. 05/28/2023 - Sunday Rig up to test LS/SS/IA, double check all connections, valves, start 2773 psi @ 15 min 2400 psi loss of 373 psi, stop test, wait for further instructions move on to test DI-4. R/U E-line on LS Run in the SS with E line, tag bottom @ 1048 47 bbls cement lost, likely through holes in 9-5/8" casing at 3000' MD. -bjm follow with 130 bbl 14 ppg Class A +4% FCG+.3%FFL, close IA, switch from IA to pump out LS Pump 57 bbl, drop wiper ball displace with 9 bbl Total cement pumped 187 bbl Start pumping RIH tag @ 594' CCL = 598'. Pick up & re-tag same, POOH, recovered small amount of cmt from bailer down SS in IA, Total cement loss while pumping out LS- 47 bbl Rig Start Date End Date SL / Cmt Pump 10/21/22 6/21/23 Daily Operations: Hilcorp Alaska, LLC Well Operations Summary API Number Well Permit NumberWell Name S MGS Unit 11 50-733-20104-00-00 168-032 06/02/2023- Friday P&A work on Di-09. R/U E-line on Di-11 on NE leg. Perf. LS tbg, run 3ft perf gun with 6 shots/ft between collars @ 515'md and 482'md, per's from 500'-503', good indication of firing. Zeroed tool at grating walk around in well room as before. R/D e-line. R/U to circulate down the LS tbg x SS tbg @.5bpm pressured up no returns, 250psi, IA=0psi, OA=225psi, OOA=0psi, (communication verified to OA). Pump down SS tbg x LS tbg @ .5bpm- pressured up no returns 600psi, IA=0psi, OA=0psi, OOA=0psi. No communication thru SS tbg. R/U E-line, run 2.88" drift thru SS tbg to 600'md with bobble @ perf area and slight over pull coming up thru perf. Decision made to perf SS tbg a jt lower to establish communication between SS tbg x LS tbg x IA. Perf. SS tbg-run 2ft gun with 6 shots/ft between collars @ 550'md and 518'md, per's from 530'-532', good indication of firing. Zeroed tool at grating walk around in well room as before. R/D e- line. R/U to circulate down the SS tbg x LS tbg, pump @2bpm/200psi, IA=60psi, OA=0psi, OOA=0psi, (communication verified to IA). Pump down SS tbg and shut in LS tbg, pump @ .5bpm- pressured up 500psi, IA=440psi, OA=400psi, OOA=0psi, (communication verified to IA and OA). Bleed down and shut in well for the night. Rest crew. 06/08/2023 - Thursday Strapped tanks prior to starting- Frac tank= 210 BBLS, Diffuser= 0 BBLS. Lined up and pumped 45 BBLS of 14 PPG cement down SS and up OA @ 2 BPM, 220 PSI. At 25 BBLS away slowed rate down to 1.5 BPM, 350-450 PSI. Good returns observed at 45 BBLS pumped 1.5 BPM, 330 PSI. Shut down and close in OA. Lined up to pump down SS and up IA. Pumped 31 BBLS of 14 PPG cement at 2 BPM, 200 PSI observing good cement at surface. Shut down and close IA. Line up to LS and pump 6 BBLS of 14 PPG down SS and up LS observing good cement at surface 2 BPM, 210 PSI. Shut in LS. Squeezed 2.2 BBLS in OOA at .5 BPM shutting down at 520 PSI. Pressure bled to 420 in 5 min. Pumped .3 BBLS to 500 PSI squeezing a total of 2.5 BBLS. Pumped a total of 84.5 BBLS of cement for the job. Total fluid back from cement job was 82 BBLS of that 6 BBLS was cement. Squeezed a total of 2.5 BBLS in OOA. Frac tank=270 BBLS, Diffuser tank= 22 BBLS. Performed sheen test on CMT- good test. Overboard wash water and cement during clean up. R/u circ eq. on Di-17. PT lines to 2500psi, Injected 256bbls Diesel/FIW/Brine returns from Di-11 @ 2.3bpm/2500psi. SD pump blow lines dry and R/d eq. 06/06/2023 - Tuesday Rig up on Di-11. Hold PJSM. Fill lines and PT to 1100 PSI. Line up and attempt to circulate through OOA pressuring up to 500 PSI and holding for 3 min bleeding down to 400 PSI. Bled off and pumped 2x's BU in OA, IA and LS through SS at 2.5 BPM, 200 PSI. Spot FIW/Surfactant in OA, IA and LS. Observed cement in the bottom of the diffuser tank ranging from 16- 24 inches deep. R/U vac and cleaned out bottom of diffuser tank filling up 4 cutting totes with cement. Put sugar in each totes. Rest Crew Squeezed 2.2 BBLS in OOA at .5 BPM shutting down at 520 PSI Perf. SS tbg-run 2ft gun with 6 shots/ft between collars @ 550'md and 518'md, per's from 530'-532 up to pump down SS and up IA. R/U E-line on Di-11 No communication thru SS tbg. Pump down SS tbg and shut in LS tbg, pump @ .5bpm- pressured up 500psi, IA=440psi, OA=400psi, OOA=0psi, (communication verified to IA and OA). Good returns observed at 45 BBLS pumped 1.5 BPM, 330 PSI. Shut down and close in OA Perf. LS tbg, Line up to LS and pump 6 BBLS of 14 PPG down SS and up LS observing good cement at surface Bled off and pumped 2x's BU in OA, IA and LS through SS at 2.5 BPM, 200 PSI Total fluid back from cement job was 82 BBLS of that 6 BBLS was cement. Squeezed a total of 2.5 BBLS in OOA Pumped 31 BBLS of 14 PPG cement at 2 BPM, 200 PSI observing good cement at surface. per's from 500'-503 Pumped .3 BBLS to 500 PSI squeezing a total of 2.5 BBLS. Pumped a total of 84.5 BBLS of cement for the job L R/U to circulate down the SS tbg x LS tbg, pump @2bpm/200psi, IA=60psi, OA=0psi, OOA=0psi, (communication verified to IA). Lined up and pumped 45 BBLS of 14 PPG cement down SS and up OA Rig Start Date End Date SL / Cmt Pump 10/21/22 6/21/23 Daily Operations: Hilcorp Alaska, LLC Well Operations Summary API Number Well Permit NumberWell Name S MGS Unit 11 50-733-20104-00-00 168-032 06/21/2023 - Wednesday Verified TOC; OOA-visual cement at surface, OA-visual cement at surface, IA-visual cement at surface, SS-tag cement 2' down, LS-visual cement at surface. Verified TOC; OOA-visual cement at surface, OA-visual cement at surface, IA-visual cement at surface, SS-tag cement 2' down, LS-visual cement at surface MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section:35 Township:8N Range:13W Meridian:Seward Drilling Rig:N/A Rig Elevation:N/A Total Depth:10508 ft MD Lease No.:ADL 0018746 Operator Rep:Suspend:P&A:X Conductor:20"O.D. Shoe@ 605 Feet Csg Cut@ Feet Surface:13 3/8"O.D. Shoe@ 2001 Feet Csg Cut@ Feet Intermediate:O.D. Shoe@ Feet Csg Cut@ Feet Production:9 5/8"O.D. Shoe@ 9676 Feet Csg Cut@ Feet Liner:7"O.D. Shoe@ 10502 Feet Csg Cut@ Feet SS Tubing:3 1/2" x 2 7/8"O.D. Tail@ 9310 Feet Tbg Cut@ Feet LS Tubing:3 1/2" x 2 7/8"O.D. Tail@ 10106 Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm)Depth (Top)MW Above Verified LS Tubing Fullbore Bottom 10508 ft SS Tubing Fullbore Bottom 10508 ft 1048 ft Wireline tag Initial 15 min 30 min 45 min Result Tubing 2761 2546 2428 IA 0 0 0 OA 0 0 0 Remarks: Attachments: Walter Waite Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): Could not get down to tag top of cement in LS because of stringers (cement dribbles) in tubing. No cement sample in bailer of SS. Cement was to hard to capture. May 27, 2023 Sully Sullivan Well Bore Plug & Abandonment S MSG Unit Dillon 11 Hilcorp Alaska LLC PTD 1680320; Sundry 322-602 Photo of MIT setup Test Data: F Casing Removal: rev. 11-28-18 2023-0527_Plug_Verification_SMSG_Di-11_ss                Plug Verification - SMGS Dillon 11 (PTD 1680320) 5/27/2023 MIT Setup Kyle Wiseman Hilcorp Alaska, LLC Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: Kyle.Wiseman@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 11/21/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20221121 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# CLU 05RD2 50133204740200 222092 10/18/2022 AK E-Line Perf_GPT MGS S MGS Unit 11 50733201040000 168032 10/11/2022 AK E-Line LDL SRU 241-33 50133206630000 217047 8/29/2022 AK E-Line TTBP_Perf SRU 32A-33 50133101640100 191014 9/23/2022 AK E-Line GPT SCU 344-33 50133202930100 218054 9/11/2022 AK E-Line Punch BCU 18RD 50133205840100 222033 9/10/2022 AK E-Line GPT BCU 18RD 50133205840100 222033 9/18/2022 AK E-Line Stim BRU 233-23 50283201360100 222050 11/1/2022 AK E-Line Perf BRU 233-23 50283201360100 222050 9/12/2022 AK E-Line CIBP Please include current contact information if different from above. T37280 T37281 T37282 T37283 T37284 T37285 T37285 T37286 T37286 By Meredith Guhl at 2:54 pm, Nov 21, 2022 MGS S MGS 50733201040000 168032 10/11/2022 AK E-Line LDLUnit 11 Meredith Guhl Digitally signed by Meredith Guhl Date: 2022.11.21 14:55:38 -09'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section:35 Township:8N Range:13W Meridian:Seward Drilling Rig:N/A Rig Elevation:N/A Total Depth:10508 ft MD Lease No.:ADL 0018746 Operator Rep:Suspend:P&A:X Conductor:20"O.D. Shoe@ 605 Feet Csg Cut@ Feet Surface:13 3/8"O.D. Shoe@ 2001 Feet Csg Cut@ Feet Intermediate:O.D. Shoe@ Feet Csg Cut@ Feet Production:9 5/8"O.D. Shoe@ 9676 Feet Csg Cut@ Feet Liner:7"O.D. Shoe@ 10502 Feet Csg Cut@ Feet SS Tubing:3 1/2" x 2 7/8"O.D. Tail@ 9310 Feet Tbg Cut@ Feet LS Tubing:3 1/2" x 2 7/8"O.D. Tail@ 10106 Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm)Depth (Top)MW Above Verified Initial 15 min 30 min 45 min Result Tubing 2753 2724 2711 IA 0 0 0 OA 5 5 5 OOA 0 0 0 Initial 15 min 30 min 45 min Result Tubing IA OA Remarks: Attachments: MIT-T only. The tag was witnessed on an earlier date by AOGCC Petroleum Inspector Brian Bixby. November 4, 2022 Guy Cook Well Bore Plug & Abandonment S MSG Unit Dillon 11 Hilcorp Alaska LLC PTD 1680320; Sundry 322-602 none Test Data: P Casing Removal: Wade Hudgens Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): rev. 11-28-18 2022-1104_Plug_Verification_SMSG_Di-11_gc              CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Aras Worthington To:McLellan, Bryan J (OGC) Subject:RE: [EXTERNAL] SMGS 11 (PTD 168-032) P&A sundry Date:Wednesday, October 19, 2022 1:48:41 PM Attachments:image001.png image003.png Bryan, These are all of the records I have found (IADC reports) on the 9-5/8” cement job (see snapshots below). It doesn’t note any lost returns or other issues. I’m unsure how the calculations on the schematic were made. Assuming 20% washout, and using a standard ~1.1 cu-ft per sack, I calculate a TOC of ~6400’ MD. That said, I’m unfamiliar with the additives listed below. Usually additives give you more yield on the cement so would make for a shallower cement top, so using 1.1 give a conservative estimate. CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders. Aras Worthington Hilcorp Alaska LLC Senior Technical Advisor for Alaska Operations Aras.worthington@hilcorp.com 907-564-4763 907-440-7692 mobile From: McLellan, Bryan J (OGC) <bryan.mclellan@alaska.gov> Sent: Wednesday, October 19, 2022 10:47 AM To: Aras Worthington <Aras.Worthington@hilcorp.com> Subject: [EXTERNAL] SMGS 11 (PTD 168-032) P&A sundry Aras, What do you know about the 9-5/8” primary cement job? Did it go according to plan? Were there losses, packoffs, other issues? What is estimated TOC and how was it determined? Thanks Bryan McLellan Senior Petroleum Engineer Alaska Oil & Gas Conservation Commission 333 W 7th Ave Anchorage, AK 99501 Bryan.mclellan@alaska.gov +1 (907) 250-9193 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email ortelephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will notadversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. By Anne Prysunka at 2:25 pm, Oct 26, 2022 605 1250 sx, Cmt at surface 7\SHRI5HTXHVW $EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:HOO 2SHUDWLRQVVKXWGRZQ 6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDP 3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HHQWHU6XVS:HOO $OWHU&DVLQJ 2WKHUBBBBBBBBBBBBBBBBBBB 2SHUDWRU1DPH &XUUHQW:HOO&ODVV 3HUPLWWR'ULOO1XPEHU ([SORUDWRU\ 'HYHORSPHQW $GGUHVV6WUDWLJUDSKLF 6HUYLFH $3,1XPEHU ,ISHUIRUDWLQJ:HOO1DPHDQG1XPEHU :KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO" :LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ" <HV 1R 3URSHUW\'HVLJQDWLRQ /HDVH1XPEHU  )LHOG &XUUHQW3RROV 0LGGOH*URXQG6KRDO  7RWDO'HSWK0' IW  7RWDO'HSWK79' IW  (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363 SVL  3OXJV 0'  -XQN 0'   6HHVFKHPDWLF &DVLQJ &ROODSVH 6WUXFWXUDO &RQGXFWRU 6XUIDFH SVL ,QWHUPHGLDWH 3URGXFWLRQ SVL /LQHU SVL 3DFNHUVDQG66697\SH 3DFNHUVDQG66690' IW DQG79' IW  $WWDFKPHQWV 3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF :HOO&ODVVDIWHUSURSRVHGZRUN 'HWDLOHG2SHUDWLRQV3URJUDP %236NHWFK ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH (VWLPDWHG'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN &RPPHQFLQJ2SHUDWLRQV 2,/ :,1- :'63/6XVSHQGHG 9HUEDO$SSURYDO 'DWH *$6 :$* *6725 63/8* $2*&&5HSUHVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG &RQWDFW1DPH$UDV:RUWKLQJWRQ 'DQ0DUORZH &RQWDFW(PDLO$UDV:RUWKLQJWRQ#KLOFRUSFRP &RQWDFW3KRQH  $XWKRUL]HG7LWOH 2SHUDWLRQV 0DQDJHU &RQGLWLRQVRIDSSURYDO1RWLI\$2*&&VRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU 3OXJ,QWHJULW\ %237HVW 0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH 2WKHU 3RVW,QLWLDO,QMHFWLRQ0,75HT G"<HV 1R 6SDFLQJ([FHSWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG $33529('%< $SSURYHGE\ &200,66,21(5 7+($2*&& 'DWH &RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ        66   /6       3HUIRUDWLRQ'HSWK0' IW  SVL 0' SVL       /HQJWK 6L]H 3URSRVHG3RROV 79' %XUVW 35(6(17:(//&21',7,216800$5<    a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y Anne Prysunka at 9:00 am, Oct 14, 2022  'LJLWDOO\VLJQHGE\'DQ0DUORZH  '1FQ 'DQ0DUORZH   RX 8VHUV 'DWH  'DQ0DUORZH  ; 3URYLGH  KUV QRWLFH IRU $2*&& RSSRUWXQLW\ WR ZLWQHVV FHPHQW SOXJ SUHVVXUH WHVWV DQG 72& WDJV '65 ; %-0  '/% $WWHPSW WR VTXHH]H XS WR  EEOV RI FHPHQW RXWVLGH  FDVLQJ GXULQJ LQWHUPHGLDWH FHPHQW MRE *&:  Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2022.10.20 11:51:35 -08'00' RBDMS JSB 102422 3 $6XQGU\ :HOO'L 37' tĞůůEĂŵĞ͗ŝͲϭϭ W/EƵŵďĞƌ͗ϱϬͲϳϯϯͲϮϬϭϬϰͲϬϬͲϬϬ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^ŚƵƚͲ/ŶWƌŽĚƵĐĞƌ ZŝŐ͗^>͕>͕& ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗KĐƚŽďĞƌϮϬϮϮ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϮǁĞĞŬƐ ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛Ě͍zĞƐ͗ϭϬͲϰϬϯ Wd͗ϭϲϴͲϬϯϮ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗:ƵĂŶŝƚĂ>ŽǀĞƚƚ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ƌĂƐtŽƌƚŚŝŶŐƚŽŶ ϵϬϳͲϱϲϰͲϰϳϲϯ;KͿ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗<ĂƚŚĞƌŝŶĞKĐŽŶŶŽƌ ϵϬϳͲϳϳϳͲϴϯϳϲ;KͿ ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ;ĞƐƚͿ͗ϯϳϱϬƉƐŝΛϵϮϬϬ͛ds;ĞƐƚ͘Ϳ DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϯϴϬϬƉƐŝ DĂdžŝŵƵŵWŽƚĞŶƚŝĂů^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϮϴϴϬƉƐŝ 'ĂƐŽůƵŵŶ'ƌĂĚŝĞŶƚ;Ϭ͘ϭƉƐŝͬĨƚͿ ƵƌƌĞŶƚWƌĞƐƐƵƌĞƐd;>^Ϳͬd;^^Ϳͬ/ͬKͬKK͗ϬͬϮϱͬϭϭϬͬϯϬͬϬ +LVWRU\ 'ULOOHGDQGFRPSOHWHGLQDVDQRLOZHOODV6RXWK0LGGOH*U RXQG6KRDO8QLW1R7KHZHOO ZDVFRQYHUWHGLQWRDZDWHULQMHFWLRQZHOOLQ'HFHPEHU,Q2FWREHUWKHZHOOZDV UHFRPSOHWHGLQWRDGXDOVWULQJLQMHFWRU $OHDNLQFDVLQJDW¶ZDVVTXHH]HGZLWKFHPHQWEXWDQ0,7,$IDLOHGDWSVL 7KHZHOOZDV6KXW,QLQGXHWRWXELQJ[,$FRPPXQLFDWLRQ &XUUHQW6WDWXV 6KXWLQ /6KDVPXOWLSOH(/6/ILVK/,+ ´FRQGXFWRUVHWDW¶ZLWKFHPHQWUHWXUQVWRVXUIDFH7HVWHGWRSVLIRUPLQXWHV ´VXUIDFHFDVLQJVHWDW¶FHPHQWHGZLWKVDFNVRIFODVV*72&WDJJHGWKURXJK WKH22$YDOYH#a¶0' ´LQWHUPHGLDWHVHWDW¶FHPHQWHGZLWKVDFNVFODVV*SSJPXGLQKROH1R SUHVVXUHWHVWVUHFRUGHGDIWHUSULPDU\MRE/HDNLQFDVLQJDW¶ 0,7,$IDLOHGDWSVL 3 $6XQGU\ :HOO'L 37' 3UH3 $GLDJQRVWLFZRUNFRPSOHWHG  %OHG´[´DQQXOXV 2$ WRSVL  %OHGWKH´[´DQQXOXV 22$ WRSVL  %OHGWKH,$WRSVL  37¶GWKH/6DQG66WRSVL373DVV  &LUFXODWHGRZQ,$DQGRXW/6ESPSVLEXWFDQQRWFLUFXODWHGRZQ/6DQGRXW,$  6637¶GWRSVLDQGQRFRPPXQLFDWLRQZLWK/6RU,$ 37¶G,$WRSVLDQGLQMHFWVDWESPSVL 37¶GWKH2$WRSVL1RLQMHFWLYLW\ 37¶GWKH22$WRSVL1RLQMHFWLYLW\ 66WDJJHG#¶6/0Z´*5 3XPS'\HGSLOOLQ5,:GRZQ,$ZLWKUHWXUQVIURP/63XPSEEOVVSDFHUDQGEEOG\HG SLOO#ESP*RWUHWXUQVIURP/6#EEOVDZD\DQGFDXJKWSUHVVXUHESPSVL 3XPSHGEEOVDQGORVWEEOVWRWDO1RG\HUHWXUQHG/HDNLVGHHSHUWKDQa¶0' )LVKHGWKUHHFXWWHUEDUVIURPWKH66DQGEURNHWKHZLUHRIIWKHWRSRIWKHVWXFN6/WRROVWULQJ ZLWKDEOLQGER[$WWHPSWHGWRILVK6/ZLWKZLUHILQGHUDQGURSHVSHDUZLWKRXWVXFFHVV 6WUDS72&LQ22$#a¶0' &7PLOOHGVFDOHLQ66DQGUHWULHYHGDOO6/FXWWHUEDUVDQG6/WRROVWULQJ0LOOHGVFDOHGRZQ WR¶&70$WWHPSWWRSXPSGRZQ66ZLWKUHWXUQVIURP/61RUHWXUQVXS/6LQMHFWLQJ #ESP#SVL&LUFXODWHGRZQ66ZLWKUHWXUQVIURP,$#ESP#SVL 5DQEDVHOLQH(/WHPSORJGRZQ66WRWDJ#a¶0'7RROVVWXFNRQERWWRP3XPS GRZQ,$ZLWKUHWXUQVIURP66WRIUHHWRROV7ULHGWRLQMHFWLQWR,$EXWZLOOQRWLQMHFWDQ\PRUH #SVL322+ 5DQ´*5RQ6/LQ66WR¶ZQRLVVXHV 6HW´' '+ROHILQGHULQ66#a¶6/037IDLOHGDQGWRROVVWXFN/RVWVSDQJV DQGF\FOHGRLOMDUVXQWLOF\FOHGRXW3XPSHGGRZQ,$ZUHWXUQVIURP66WRIUHHWRROV1R VXFFHVV'URSSHGFXWWHUEDUDQGFXW6/DWWRSRIWRROV5HFRYHUHGDOO6/DQGFXWWHUEDU 1RWHWKH66PD\EHVSOLWDWERWWRPFDXVLQJWRROVWULQJVWRJHWVWXFNWKHUH 58(/DQGSHUIRUPEDVHOLQHSDVVWR¶0' VWLFN\ERWWRPHOHFWQRWWRJRGHHSHUGXHWR VWXFNWRROULVN $WWHPSWWRLQMHFWLQWR,$#SVLQRLQMHFWLRQ3XPSGRZQ66ZLWK UHWXUQVIURP,$DQGYHULI\WHPSHUDWXUHVKLIW#¶0'&LUFXODWLRQLVJRLQJGRZQ66 EHORZWRROVDQGXS,$/RJ22+DQGVHHQRRWKHUDQRPDOLHV 3HUIRUDWH66DQGLQWR/6#a¶(/0 DVGHHSDVSRVVLEOHZLWKRXWVWLFNLQJWRROV  $6) 9HULI\FLUFXODWLRQIURP66WR/6ESP#SVL3XPSHGEEOVRI),:GRZQWKH66 ZLWKUHWXUQVIURPWKH/6 ERWWRPVXSLVEEOV  2EMHFWLYH 3OXJDQGDEDQGRQWKHZHOOWRVXUIDFH7KH66LVSHUIRUDWHG#¶0'DQGFLUFXODWLRQGRZQ WKH66DQGXSWKH,$KDVEHHQYHULILHGWREHEHORZ¶0'ZLWK(/WHPSHUDWXUHORJ 3UHYLRXVO\WKHUHZDVLQMHFWLYLW\GRZQWKH66DQGWKH,$EXWFXUUHQWO\WKHUHLVQRLQMHFWLYLW\LQWR HLWKHU7KHSHUIRUDWLRQV#¶KDYHFUHDWHGFLUFXODWLRQGRZQWKH66DQGXSWKH/67KHUHLV QRLQMHFWLYLW\LQWRWKH2$RU22$7KLVZHOOLVDJRRGFDQGLGDWHIRUDWKURXJKWXELQJIXOOERUH 3 $ 3 $6XQGU\ :HOO'L 37' +LOFRUSUHTXHVWVDYDULDQFHWR$$& F    ( +LOFRUSUHTXHVWVWKHH[LVWLQJSDFNHU #a¶0'WREHXVHGLQSODFHRIDPHFKDQLFDOEULGJHSOXJDWDVHWKHLJKWRIIHHWDERYH WKHH[LVWLQJORZHUSHUIRUDWHGLQWHUYDO&HPHQWZLOOEHSODFHGDERYHWKHSDFNHULQWKH7XELQJ[ ,$7KHEDVHRIWKHSURSRVHG3 $SOXJLVDW¶0'7KHUHLVRQO\RQH3RROEHWZHHQWKDW GHSWKDQGWKHWRSRISHUIRUDWLRQVDW¶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¾ EEOV5,:Z6XUIDFWDQW:DVK GRZQ66DQGRXW,$ ¾ EEOVSSJEULQH GRZQ66DQGRXW,$ ¾ EEOVSSJ&ODVV*FHPHQW GRZQ66WDNLQJUHWXUQVIURPWKH/6  L :KHQEEOVRIFHPHQWDUHDZD\VZDSWRWDNHUHWXUQVIURPWKH,$ LL /DXQFKIRDPZLSHUEDOOEHKLQGFHPHQWDQGFKDVHZLWKEEOVSSJ EULQHFRQWLQXHWRWDNHUHWXUQVIURPWKH,$ LLL :KHQEEOVEULQHDUHDZD\VZDSWRWDNLQJUHWXUQVIURPWKH/6 1RWHEEOVRISSJEULQHGLVSODFHPHQWSXWV72&LQ66#a¶ HTXLYDOHQWZLWK,$DQG/6 9ROXPHV ¾ /6YROXPHIURPSHUIRUDWLRQVWR¶0'ESI  ¶¶  EEOV ¾ ,$YROXPHIURPSHUIRUDWLRQVWR¶0'ESI ¶±¶  EEOV ¾ 66YROXPHIURPSHUIRUDWLRQVWR¶0'ESI  ¶¶  EEOV 7RWDO&HPHQW9ROXPHEEOV ¾ 66YROXPHIURPSHUIRUDWLRQVWRVXUIDFHESI ¶ EEOV ¾ ,$YROXPHIURP¶0'WRVXUIDFHESI ¶ EEOV ¾ /6YROXPHIURP¶0'WRVXUIDFHESI ¶ EEOV ¾ 66YROXPHIURP¶0'WRVXUIDFHESI ¶ EEOV )XOOERUH6OLFNOLQH(OLQH  &0,7/6[66WRSVL $2*&&:LWQHVVHG  1RWH$Q0,7RIWKH,$ZLOOQRWSDVVGXHWRWKHFDVLQJOHDN#a¶0'  7DJ72&LQ66 $2*&&:LWQHVVHG   3HUIRUDWHWKH66/6DQG´FDVLQJ#a¶0' )XOOERUH  9HULI\FLUFXODWLRQGRZQWKH66RXWWKH,$DQG/6  3XPS66[,$[/6LQWHUPHGLDWHFHPHQWSOXJ ¾ EEOVSSJ&ODVV*FHPHQWGRZQWKH66ZLWKUHWXUQVIURPWKH,$ L :KHQEEOVRIFHPHQWDUHDZD\VZDSWRWDNLQJUHWXUQVIURPWKH/6 LL &LUFXODWHRXWWKH/6XQWLOJRRGFHPHQWUHWXUQVWRVXUIDFH LLL /DXQFKIRDPEDOODQGGLVSODFHZLWKEEOVSSJEULQH 9ROXPHV ¾ /6YROXPHIURPSHUIRUDWLRQVWRVXUIDFHESI  ¶  EEOV ¾ ,$YROXPHIURPSHUIRUDWLRQVWR¶0'ESI ¶±¶  EEOV ¾ 66YROXPHIURPSHUIRUDWLRQVWR¶0'ESI  ¶¶  EEOV 7RWDO&HPHQW9ROXPHEEOV ¾ 66YROXPHIURPSHUIRUDWLRQVWRVXUIDFHESI ¶ EEOV ¾ 66YROXPHIURP¶0'WRVXUIDFHESI ¶ EEOV 7DJ 72& LQ /6 DOVR  EMP LY $SSO\ VTXHH]H SUHVVXUH RI  SVL WR ,$ 'R QRW GLVSODFH PRUH WKDQ  EEOVEMP 3 $6XQGU\ :HOO'L 37' )XOOERUH6OLFNOLQH(OLQH  &0,766[,$WRSVL $2*&&:LWQHVVHG   7DJ72&LQ66 3HUIRUDWHWKH66/6´DQG´FDVLQJ#a¶0' )XOOERUH 9HULI\FLUFXODWLRQGRZQWKH66RXW,$2$22$DQG/6 22$PD\QRWFLUFXODWHVLQFH 72&LQ22$WDJJHG#a¶0'DQG/6PD\QRWFLUFXODWHEHFDXVHLWZDVFHPHQWHGWR VXUIDFHLQVWHS  3XPS66[,$[2$[22$[/6FHPHQWSOXJ ¾ EEOV),:Z6XUIDFWDQW:DVKGRZQ66WDNLQJUHWXUQVIURPWKH22$ LI FLUFXODWLRQHVWDEOLVKHGRXW22$ L &LUFXODWHEEOVLQWR22$ LIFLUFXODWLRQHVWDEOLVKHG LL &LUFXODWHEEOVLQWR2$ LLL &LUFXODWHEEOVLQWR,$ ¾ &LUFXODWH[ERWWRPVXSZLWK),:IURP22$2$DQG,$ ¾ EEOVSSJ&ODVV*FHPHQW L &LUFXODWHRXWWKH22$XQWLOJRRGFHPHQWUHWXUQV LIFLUFXODWLRQ HVWDEOLVKHG LL &LUFXODWHRXWWKH2$XQWLOJRRGFHPHQWUHWXUQVDUHREVHUYHGDWVXUIDFH LLL &LUFXODWHRXWWKH,$XQWLOJRRGFHPHQWUHWXUQVDUHREVHUYHGDWVXUIDFH LY &LUFXODWHRXWWKH/6XQWLOJRRGFHPHQWUHWXUQV LIFLUFXODWLRQHVWDEOLVKHG ¾ 6,DOODQQXOLH[FHSWWKH22$DQGVTXHH]HWRSVL 9ROXPHV ¾ 22$IURP¶WRVXUIDFH¶[ EEOV ¾ 2$IURP¶WRVXUIDFH¶ ESI EEOV ¾ ,$IURP¶0'WRVXUIDFH¶[ESI EEOV ¾ 66IURP¶0'WRVXUIDFH¶[ESI EEOV ¾ /6IURP¶0'WRVXUIDFH¶[ESI EEOV ¾7RWDO&HPHQW9ROXPHEEOV $WWDFKPHQWV &XUUHQW6FKHPDWLF 3URSRVHG6FKHPDWLF /RJRI&RQILQLQJ=RQHV 3 $6XQGU\ :HOO'L 37' 'L&XUUHQW 3 $6XQGU\ :HOO'L 37' 'L3URSRVHG 3 $6XQGU\ :HOO'L 37' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 35 Township: 8N Range: 13W Meridian: Seward Drilling Rig: N/A Rig Elevation: N/A Total Depth: 10508 ft MD Lease No.: ADL 0018746 Operator Rep: Suspend: P&A: XXX Conductor: 20" O.D. Shoe@ 605 Feet Csg Cut@ Feet Surface: 13 3/8" O.D. Shoe@ 2001 Feet Csg Cut@ Feet Production 9 5/8" O.D. Shoe@ 9676 Feet Csg Cut@ Feet Liner 7" O.D. Shoe@ 10502 Feet Csg Cut@ Feet SS Tubing: 3 1/2" x 2 7/8" O.D. Tail@ 9310 Feet Tbg Cut@ Feet LS Tubing: 3 1/2" x 2 7/8" O.D. Tail@ 10106 Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Fullbore Balanced 9074 ft SS 6718 ft 9.8 ppg Wireline tag Pre-Test Initial 15 min 30 min 45 min Result Tubing IA OA OOA Remarks: Attachments: Harold Soule Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): Hilcorp decided to wait and let the cement set up more as it was just pumped yesterday. No Long String tubing tag required per email from AOGCC dated 10/21/2022. September 23, 2022 Brian Bixby Well Bore Plug & Abandonment S MSG UNIT Dillon 11 Hilcorp Alaska LLC PTD 1680320; Sundry 322-602 none Test Data: Casing Removal: rev. 11-28-18 2022-1023_Plug_Verification_SMGS_Di-11_bb 'LOORQUHTXLUHVWHVWIRUSOXJYHULILFDWLRQMEU 9 9 9 9 9 9 99 9 9 9 9 9 9 9 9 let the cement set up more as it was just pumped yesterday. James B. Regg Digitally signed by James B. Regg Date: 2022.10.27 16:04:42 -08'00' By Anne Prysunka at 9:11 am, Sep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a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y Samantha Carlisle at 9:24 am, Sep 12, 2022  'LJLWDOO\VLJQHGE\'DQ0DUORZH  '1FQ 'DQ0DUORZH   RX 8VHUV 'DWH  'DQ0DUORZH  '65 ; '/% &7 %23 WHVW WR  SVL ; %-0    GWV -/&  Jeremy Price Digitally signed by Jeremy Price Date: 2022.09.16 12:40:26 -08'00'  3 $6XQGU\ :HOO'L 37'   tĞůůEĂŵĞ͗ŝͲϭϭW/EƵŵďĞƌ͗ϱϬͲϳϯϯͲϮϬϭϬϰͲϬϬͲϬϬ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^ŚƵƚͲ/ŶWƌŽĚƵĐĞƌZŝŐ͗^>͕>͕d ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗^ĞƉƚĞŵďĞƌϮϬϮϮƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϮǁĞĞŬƐ ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛Ě͍zĞƐ͗ϭϬͲϰϬϯWd͗ϭϲϴͲϬϯϮ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗:ƵĂŶŝƚĂ>ŽǀĞƚƚ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ƌĂƐtŽƌƚŚŝŶŐƚŽŶϵϬϳͲϱϲϰͲϰϳϲϯ;KͿ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗<ĂƚŚĞƌŝŶĞKĐŽŶŶŽƌϵϬϳͲϳϳϳͲϴϯϳϲ;KͿ  ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ;ĞƐƚͿ͗ϯϳϱϬƉƐŝΛϵϮϬϬ͛ds;ĞƐƚ͘Ϳ     DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϯϴϬϬƉƐŝ  DĂdžŝŵƵŵWŽƚĞŶƚŝĂů^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϮϴϴϬƉƐŝ 'ĂƐŽůƵŵŶ'ƌĂĚŝĞŶƚ;Ϭ͘ϭƉƐŝͬĨƚͿ ƵƌƌĞŶƚWƌĞƐƐƵƌĞƐd;>^Ϳͬd;^^Ϳͬ/ͬKͬKK͗ϬͬϮϱͬϭϭϬͬϯϬͬϬ  +LVWRU\ 'ULOOHGDQGFRPSOHWHGLQDVDQRLOZHOODV6RXWK0LGGOH*URXQG6KRDO8QLW1R7KHZHOO ZDVFRQYHUWHGLQWRDZDWHULQMHFWLRQZHOOLQ'HFHPEHU,Q2FWREHUWKHZHOOZDV UHFRPSOHWHGLQWRDGXDOVWULQJLQMHFWRU  $OHDNLQFDVLQJDW¶ZDVVTXHH]HGZLWKFHPHQWEXWDQ0,7,$IDLOHGDWSVL  7KHZHOOZDV6KXW,QLQGXHWRWXELQJ[,$FRPPXQLFDWLRQ  &XUUHQW6WDWXV 6KXWLQ  /6DQG66KDYHPXOWLSOH6/DQG(/ILVKVWXFNLQWKHWXELQJ  ´FRQGXFWRUVHWDW¶ZLWKFHPHQWUHWXUQVWRVXUIDFH7HVWHGWRSVLIRUPLQXWHV  ´VXUIDFHFDVLQJVHWDW¶FHPHQWHGZLWKVDFNVRIFODVV*72&WDJJHGWKURXJK WKH22$YDOYH#a¶0'  ´LQWHUPHGLDWHVHWDW¶FHPHQWHGZLWKVDFNVFODVV*SSJPXGLQKROH1R SUHVVXUHWHVWVUHFRUGHGDIWHUSULPDU\MRE/HDNLQFDVLQJDW¶ 0,7,$IDLOHGDWSVL   66ILVKFXUUHQWO\/,+DVIROORZV  ¾ ¶RI´6/ ¾  ;¶''EDLOHU  ILVKQHFN  ; ER[;SLQ[RYHU ´ILVK QHFN ; VSDQJMDUV  ILVKQHFN ; RLOMDUV  ILVKQHFN  ; NQXFNOHMRLQW  ILVKQHFN ; VWHP  ILVKQHFN ; VWHP  ILVKQHFN ; URSHVRFNHW  ILVKQHFN   2EMHFWLYH &OHDUVFDOHIURP66DQGUHFRYHU6/DQG6/WRROVWULQJ&OHDUVFDOHWRSDUDOOHOMHWSXPSFDYLW\WR DOORZIRU3 $GLDJQRVWLFVDQG3 $   3 $6XQGU\ :HOO'L 37'   3UH3 $GLDJQRVWLFZRUNFRPSOHWHG   %OHG´[´DQQXOXV 2$ WRSVL  %OHGWKH´[´DQQXOXV 22$ WRSVL  %OHGWKH,$WRSVL  37¶GWKH/6DQG66WRSVL373DVV  &LUFXODWHGRZQ,$DQGRXW/6ESPSVLEXWFDQQRWFLUFXODWHGRZQ/6DQGRXW,$  6637¶GWRSVLDQGQRFRPPXQLFDWLRQZLWK/6RU,$ 37¶G,$WRSVLDQGLQMHFWVDWESPSVL 37¶GWKH2$WRSVL1RLQMHFWLYLW\ 37¶GWKH22$WRSVL1RLQMHFWLYLW\ 66WDJJHG#¶6/0Z´*5 3XPS'\HGSLOOLQ5,:GRZQ,$ZLWKUHWXUQVIURP/63XPSEEOVVSDFHUDQGEEOG\HG SLOO#ESP*RWUHWXUQVIURP/6#EEOVDZD\DQGFDXJKWSUHVVXUHESPSVL 3XPSHGEEOVDQGORVWEEOVWRWDO1RG\HUHWXUQHG/HDNLVGHHSHUWKDQa¶0' )LVKHGWKUHHFXWWHUEDUVIURPWKH66DQGEURNHWKHZLUHRIIWKHWRSRIWKHVWXFN6/WRROVWULQJ ZLWKDEOLQGER[$WWHPSWHGWRILVK6/ZLWKZLUHILQGHUDQGURSHVSHDUZLWKRXWVXFFHVV  1R SOXJV ZHUH VHW 37 G DJDLQVW ILVK DQG GHEULV LQ WEJ SHU $ :RUWKLQJRQ EMP  3 $6XQGU\ :HOO'L 37'   3URFHGXUH  &RLOHG7XELQJ  )XQFWLRQ3UHVVXUH7HVW%23(WRSVLORZSVLKLJKXQOHVVD%23WHVWKDVEHHQ SHUIRUPHGLQWKHSUHYLRXVVHYHQGD\VRQD'LOORQZHOOWRDQHTXLYDOHQWSUHVVXUH  5,+Z0RWRUDQG´PLOOLQWRVKRUWVWULQJ0LOOVFDOHGRZQWRWRSRI6/ZLUH#a¶ 6/0322+  5XQZLUHILQGHUDQGURSHVSHDUWREDOOXSZLUHDQGILVK22+  5XQ0RWRUDQG´PLOODQGPLOOVFDOHGRZQWR6/76322+  5,+ZILVKLQJWRROVIRU6/WRROVWULQJDQGUHFRYHU6/76  5XQ0RWRUDQG´PLOODQGPLOOVFDOHGRZQWR;2#¶0'  &KHFNIRUFLUFXODWLRQGRZQ66DQGRXW/6  5'02&7  6OLFNOLQH  6HW´' '+ROHILQGHULQ66#a¶6/0 3766WRSVLIRUPLQXWHV 3XOO+ROHILQGHUDQG5'026/  (OLQH 3XQFK66#a¶(/0 DVGHHSDVSRVVLEOH  3HUIRUDWH66DQGLQWR/6#a¶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y Meredith Guhl at 3:36 pm, May 06, 2022  'LJLWDOO\VLJQHGE\'DQ0DUORZH  '1FQ 'DQ0DUORZH   RX 8VHUV 'DWH  'DQ0DUORZH   '/% ; %-0  /LPLW LQMHFWLRQ YROXPH LQWR 2$ WR  EEOV DQG 22$ WR  EEO DIWHU OLTXLGSDFNLQJ WKH DQQXOL  EMP '65  JLC 5/17/2022 Jeremy Price Digitally signed by Jeremy Price Date: 2022.05.18 11:01:54 -08'00' RBDMS SJC 052322 3 $6XQGU\ :HOO'L 37' tĞůůEĂŵĞ͗ŝͲϭϭ W/EƵŵďĞƌ͗ϱϬͲϳϯϯͲϮϬϭϬϰͲϬϬͲϬϬ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^ŚƵƚͲ/ŶWƌŽĚƵĐĞƌ ZŝŐ͗^>͕& ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗DĂLJϮϬϮϮ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϭǁĞĞŬ ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛Ě͍zĞƐ͗ϭϬͲϰϬϯ Wd͗ϭϲϴͲϬϯϮ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗:ƵĂŶŝƚĂ>ŽǀĞƚƚ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ƌĂƐtŽƌƚŚŝŶŐƚŽŶ ϵϬϳͲϱϲϰͲϰϳϲϯ;KͿ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗dŽĚĚ^ŝĚŽƚŝ ϵϬϳͲϳϳϳͲϴϰϰϯ;KͿ ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ;ĞƐƚͿ͗ϯϳϱϬƉƐŝΛϵϮϬϬ͛ds;ĞƐƚ͘Ϳ DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϯϴϬϬƉƐŝ DĂdžŝŵƵŵWŽƚĞŶƚŝĂů^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϮϴϴϬƉƐŝ 'ĂƐŽůƵŵŶ'ƌĂĚŝĞŶƚ;Ϭ͘ϭƉƐŝͬĨƚͿ ƵƌƌĞŶƚWƌĞƐƐƵƌĞƐd;>^Ϳͬd;^^Ϳͬ/ͬKͬKK͗ϬͬϮϱͬϭϭϬͬϯϬͬϬ +LVWRU\ 'ULOOHGDQGFRPSOHWHGLQDVDQRLOZHOODV6RXWK0LGGOH*URXQG6KRDO8QLW1R7KHZHOO ZDVFRQYHUWHGLQWRDZDWHULQMHFWLRQZHOOLQ'HFHPEHU,Q2FWREHUWKHZHOOZDV UHFRPSOHWHGLQWRDGXDOVWULQJLQMHFWRU $OHDNLQFDVLQJDW¶ZDVVTXHH]HGZLWKFHPHQWEXWDQ0,7,$IDLOHGDWSVL 7KHZHOOZDV6KXW,QLQGXHWRWXELQJ[,$FRPPXQLFDWLRQ &XUUHQW6WDWXV 6KXWLQ /6DQG66KDYHPXOWLSOH6/DQG(/ILVKVWXFNLQWKHWXELQJ 2EMHFWLYH 3UH3 $GLDJQRVWLFV 3URFHGXUH 6OLFNOLQH)XOOERUH  %OHHG´[´DQQXOXV 2$ 1RWHIOXLGVJDVUHWXUQHGDQGEXLOGXSUDWHDIWHU6,  %OHHGWKH´[´DQQXOXV 22$ 1RWHIOXLGVJDVUHWXUQHGDQGEXLOGXSUDWHDIWHU6,  %OHHGWKH/666DQG,$1RWHIOXLGVJDVUHWXUQHGDQGEXLOGXSUDWHDIWHU6,  9HULI\FLUFXODWLRQGRZQ/6DQGRXW,$0D[WXELQJSUHVVXUHSVL  9HULI\FLUFXODWLRQGRZQ/6DQGRXW660D[WXELQJSUHVVXUHSVL 9HULI\FLUFXODWLRQGRZQ66DQGRXW,$0D[WXELQJSUHVVXUHSVL 37WKH/6[66[,$WRSVLIRUILYHPLQXWHV3HUIRUPLQMHFWLYLW\WHVWWRSVLLI37IDLOV 3XPSGRZQ´[´ 2$ DQQXOXVZLWKGLHVHOWRHVWDEOLVKLQMHFWLYLW\0D[SUHVVXUH SVL 3XPSGRZQWKH´[´ 22$ DQQXOXVZLWKGLHVHOWRHVWDEOLVKLQMHFWLYLW\0D[ SUHVVXUHSVL 'ULIW WDJWRSRIILVKLQ/6 66 3XPSG\HGSLOORI),:GRZQ/6WDNLQJUHWXUQVIURP660D[LPXP/6SUHVVXUHSVL &KDVHG\HGSLOOZLWKaEEOV),:9HULI\ZKHQG\HGSLOOLVUHWXUQHGWRVXUIDFHWRHVWLPDWH FRPPXQLFDWLRQGHSWK 9ROXPHV /LPLW LQMHFWLRQ YROXPH LQWR 2$ WR  EEOV DQG 22$ WR  EEO DIWHU OLTXLGSDFNLQJ WKH DQQXOL  EMP 3 $6XQGU\ :HOO'L 37' ¾ /6VXUIDFHWRSDFNHU¶[ESI EEOV ¾ 66VXUIDFHWRSDFNHU¶[ESI EEOV ¾ ,$VXUIDFHWRSDFNHU¶[ESI EEOV $WWDFKPHQWV &XUUHQW6FKHPDWLF 3 $6XQGU\ :HOO'L 37' ') ," ~r~~E :i IÆ~!Æ~~«!Æ A.I~A.SKA. OILAlWD GAS CONSERVATION COMMISSION Mr. Dave Cole Oil Team Manager UNOCAL P.O. Box 196247 Anchorage, AK 99516-6247 Re: Middle Ground Shoal Unit Platforms Dillon and Baker Dear Mr. Cole: ) FRANK H. MURKOWSK/, GOVERNOR 333 W. "JTH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 .~ " ."",'""'"f1:.",,,,,"", x,.,.,." 0 \:~~ This letter confinns your conversation with Commission Engineer Tom Maunder last week regarding the multiple Applicatìons for Sundry Approval (Form 403) you submitted in mid October regarding changing the monitoring frequency on the 16 wells on Dillon Platform and 23 wells on Baker Platform. Production and injection operations were halted on these platforms in 4th Q 2002 and 2nd Q 2003 respectively. Attached, please fmd the Sundry Applications, which are being returned without approval~ because the relief you request needs to be sought through a different procedure. The intent of submitting sundry notices for each well was to establish a monthly pressure and general monitoring frequency for all wells on Dillon and Baker. There is a requirement in place for some of the water injection wells that pressures and rates are to be monitored daily and reported monthly. Since the platforms are unmanned and not operating, it is not possible to obtain daily information. When operations were curtailed, a monthly monitoring frequency was established in the Plans of Development (POD) annually filed with the Division of Oil and Gas and Unocal desires to assure that this monitoring scheme is accepted by the Commission. As noted in the conversation, changing the monitoring frequency where presently in place and establishing a monthly monitoring frequency in general is not an action that is best accomplished with multiple sundry notices. A letter application requesting the desired monitoring schedule should be made under the applicable Area Injection Orders (AlO 7 for Baker and AIO 8 for Dillon) and Conservation Orders (CO 44 and CO 54) for the platforms/unit. The Commission looks forward to receiving your letter applications. If prior monthly monitoring information has not been submitted to the Commission, that information should be ubmitted forthwith. ¡:, Sincere~~ . No an Daniel T. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this _day of November, 2004 S'"'C'A' N' ,~iEn l'ln\! ~~ å. '20[\[1 ~~ J ~ '\i £"..." ì OJ t..J,' ,~I ~ J ~ Ene!. , ' l' ... Abandon U Alter casing 0 Change approved program 0 2. Operator Name: Union Oil of California aka Unocal BakerMod. 'F1' Baker seal assembly 12. Attachments: Description Summary of Proposal ~ Detailed Operations Program 0 BOP Sketch 0 14. Estimated Date for 1. Type of Request: 3. Address: 7. KB Elevation (ft): 110' KB ABOVE MSL 8. Property Designation: Dillon 11. Total Depth MD (ft): 10,508' Casing Structural Conductor Surface Intermediate Production Liner Perforation Depth MD (ft): 10,140 to 10,310' Packers and SSSV Type: Commencing Operations: 16. Verbal Approval: 605' 20" 2,501' 13-3/8" 9,676' 9-5/8" 1,073' 7" Perforation Depth TVD (ft): 9,817 to 9,983' P. O. Box 196247 Anchorage, Ak. 99519-6247 Total Depth TVD (ft): 10,170' Length ') STATE OF ALASKA --") RE EIVED ALAS!'",", OIL AND GAS CONSERVATION COMMI~v(ON 004 APPLICATION FOR SUNDRY APPROVAL OCT 1 2 2 20 AAC 25.280 Operational shutdown U Plug Perforations 0 Perforate New Pool 0 4. Current Well Class: Suspend U Repair well 0 Pull Tubing 0 1M. ,t n:t &.S:i~ ~~ ~. CnmmissÎcm Perforate ~ë5~\\i4 VI waiver, Annular Dispos. U Stimulate 0 Time Ext~qfJ~!j e Other 0 Re-enter Suspended Well 0 Monitor Frequency 5. Permit to Drill Number: Development Stratigraphic 0 0 Exploratory 0 68-32 Service 0 6. API Number: 50-733-20104-00 9. Well Name and Number: Di-11 10. Field/Pools(s): Middle Ground Shoal/"G" PRESENT WELL CONDITION SUMMARY T' Effective Depth MD (ft): Effective Depth TVD (ft): Plu (measured): 10,325' 9,996' Size MD TVjÝ Burst / / / / j 9,676' / 9,356' 9,429-10,5,92' 9,110'-10,164' Tubing Size:/ ITubing Grade: ITUbing MD (ft): 31/2" N-80 Dual to 9,272' 27/8" N-80 Single to 10,128' Packers and SSSV MD (ft): 9,320' 10,127 Junk (measured): Fish @ 9,938' Collapse 605' 604' 2,001' 1,975' 13. Well Class after proposed work: Exploratory 0 Development 15. Well Status after proposed work: Oil 0 Gas 0 WAG 0 GINJ 0 0 Service 0 0 0 Abandoned 0 0 Plugged WINJ Date: WDSPL Commission Representative: 17. I hereby certify that the foregoing is true and correct Printed Nam¡/) ~,"Ie Signature #d(/~~ the best of my knowledge. Contact Title Oil Team Supervisor 907-263-7805 Date COMMISSION USE ONLY 28-Sep-2004 Conditions of approval: Notify Commission so that a representative may witness Plug Integrity Other: Subsequent Form Required: Approved by: 0 BOP Test 0 Sundry Number: -- 2">l.J '-1- 4,;J-':J Mechanical Integrity Test 0 Location Clearance 0 ,<BDMS BFL NOV 2 2 2DD4 0 RIG I N A L I.{ 0'3 Form 10-462rRevised 12/2003 APPLICATION RETURNED 11/17/04 NOT APPROVED BY COMMISSION COMMISSIONER BY ORDER OF THE COMMISSION Date: Submit in Duplicate STATE OF ALASKA t~~,(;Ervl'-' ALASKA OIL AND GAS CONSERVATION COMMISSION ?i:q 2 6 2004 REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon Performed: Alter Casing D Change Approved Program D 2. Operator Union Oil of California Name: aka Unocal Suspend Repair Well D Pull Tubing D Operation Shutdown Plug Perforations D Perforate New Pool D 4. Current Well Class: Development D Stratigraphic D 3. Address: P. O. Box 196247 Anchorage, Ak. 99519-6247 7. KB Elevation (ft): 110' KB ABOVE MSL 8. Property Designation: Dillon 11. Present Well Condition Summary: Total Depth measured 10,508' feet true vertical 10,170' feet Effective Depth measured 10,325' feet true vertical 9,996' feet Casing Length Size MD Structural Conductor 60S' 20" 60S' Surface 2,501' 13-3/8" 2,001' Intermediate Production 9,676' 9-5/8" 9,676' Liner 1,073' 7" 9,429-10,502' Perforation depth: Measured depth: (See Attached Well bore Schematic) True Vertical depth: Tubing: (size, grade, and measured depth) 3 1/2" N-80 Dual to 9,272' 27/8" N-80 Single to 10,128' BakerMod. 'F1' @ 9,320' BakerMod. 'F1' @ 10,105' Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Perforate Waiver Other J Stimulate D Time Extension D Shut in and secure Re-enter Suspended Well D 5. Permit to Drill Number: Exploratory D 68-32 Service 0 6. API Number: 50-733-20104-00 9. Well Name and Number: Di-11 10. Field/Pool(s): Middle Ground Shoall"G" Plugs (measured) Junk (measured) fish @ 9,938' TVD Burst Collapse 604' 1,975' 9,356' 9,110'-10,164' Oil-Bbl Representative Daily Average Production or Injection Data Gas-Mcf W~ter-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: This well was shut in prior to and subsequent to operations 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory D Development D Daily Report of Well Operations 16. Well Status after proposed work: 'OirE]'~"" Gas D WAG D 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name P. M. Ayer Service 0 GINJ D WINJ 0 WDSPL 0 Sundry Number or N/A if C.O. Exempt: ï II 1$ 2004 Title Petroleum Engineer Phone 263-7620 Signature fl Date 18-Feb-2004 Form 10-404 Revised 12/2003 FEB 2 7 1ÐB4' 8Ft P~~lIIIt O.~~ Spud O~ Surfcc. LocCltlon: Sub~urlocc Location: E!avat!on: 1t>: PBD: ea.tng: . PerforotJO~: InitioI' Potentia!: InttJaI StfmulctJon: R...-votr Ckd~- Cered Intervals: DST Interval. ond Rewtb~ Lot I".,."tmy. Short Strfng: A. ;) 1/2" ButtrÞa pup Jts B. :) 112" N-80 8uttru8 tubing C. SoQr UockJ ~ s.atfng Nfpp!e O. 3 1.1r Buttran pup it E. 2 718" Y.O GI'Icf 3 112" Buttreu V(/cOllar f". 2. 7~" N-8f1 pup ]t '* (As nut ~---_._.-..- --_.' '--'--, '.' //u' ,?3., ~ '731-97:58', cut 19'. rec:avwed 11'; 2) 8758-t783',' cut 25.. rec0Y8red 2305' //¡/¿ r,t¡-tG'ø 9~?..1 ,-,/.ri.,(t':#'t_-~ 3 8850-8890", cut 40'. NCG\r8Nd 40':.) 88So-a902'. cut 12.. recoYUU 10.5" ; /... <12,,"- --- .__0---'" 5 91101.-9821', cut 19', ~ 18.5'; I) 9S21-9948', cut 27" n:COY8Rd 25. ~~"/ .) .. ,J__'_~_h'''- "-t8-8876", cut 2r. ~ 28': 8~ 11976-"96'. cut 20., na~red 14' ~-_..-' -/_, 51 8991-10002', cut 8'. r'8CCVeNd S': 10 10002-42'. cut .w, recovered 39.S' r¡~¡" 8 I 1 1 l' 0042-5-4', cut 12'. rwoavered T: 12 10054-58', cut 4', recover.d 2...5' " e qq 3 13 10058-87", cut 29', NCCV8Nd 29': 14) 10081-99', cut 1:r. re, covered S' / ,., ,,-f 15 10099-128". cut 27". reCOY8nld 2Ø' (2' of prriOU8 cor.) / f-..J ¡/~L.l '; . 18 10'28-38'. cut. 12'. NCCN8I"8d 10.5': 17) 1Q1~8-ti,.. cut: 29", ~cS 25' / or- oc.-IJ> 18 10167-97". cut:serf I'8COVVed 30': 19) 10187-218', cut 19'. J"OCOII8red 18", ,;>. 20 10216-34', cut 18'. recovered 13.5': 21) 1023+-80', cut 26°. recovered 24' / 22 102:55-79', out 24'. rucw...d 22' / ',1 î- ~lY '1 ;.~,: / )J.J - :; '''', ' ,;;. .--,f"./ ,) í,) 1..,.- ' SOUTH MIDDLE GROUND SHOAL ADL 18746 WELl NO 1 1 HEMLOCK CONGlOlAERATE PLATFORM DILLON _~mpl.tlon R.cCl~- -4/17/68 L.g 2, Slct 2. SUGS Platform DIJ:Ion 705' ~ 1874' FWL. Sea. 3S, raN. R13W 10 - ~7a' F'SL. 2.w5e' fW4 Se=. :S5. T!lN, R1 'JW 1 10' KB-I.ISL '~O8' 1VO: 1017Q' '032~' 'TW: 104t7" 20". 85 Ci."ld 8~ Ca.tng ..t crt' aos' with t 205 ax, cement 13 J.I8", $4.51 Caaln,9 Nt at 200" wtth 1800 Þ. cem.nt 9 518", ~ and 43.51 5-9S and N-80 Ccl8lng act at 9876" wltb " SO JX. cement . -r'. 231 S-8~ Unv set crt 8429-10502' with 210 IX. cement Long String: 1. Tubtng Hanger 2. 3 1/2" Suttnsu pup. 3. ;) 1/'2" N-80 auttreaa tubing 4. Bcker J.Iodel 'P SeatIng Ntppt. S. 27/818 Butt. \CO x 3 112"" Butt. XO w/collar 8. 27/8" Buttress pup 1. Bck... 194-D-'-80 Paraltel flowfMatI 8. Bcker 8" Sea! locator aub 9. Bc:1cer Seal AlMmbly '\ O. 2 7/8" Buttraa pup , 1. 2 71811 auttra. pup , 2, Bck.,. Uo4el 'F" Seating NIpple 13. 2 7/P1' EUE XO x 2 718" pfn WI'cottar , 4. Boker G-22 lOcator {tu",.d to (U c.d.) 15.' B ker Seal AaMmbI)' 16. ~ out sub G-3B: 11920-10000' 10010-10030' , ~0-1008O' 10090-10110" 1D140-10220" 10240-10310' 1 S73 SCPO. sa BWPO. 432 LfCFD C--4: Non. Won. 1E.l./SP. BHCIGR (6120168); 4-Arm Clpmet.-. OR (7/10168): Or (1/17/68) Trocw-Temperature (6I2J170): Tracar (3124/72) Spfn".,. Tracer (8124173. 916/73): Tracer (r2/12/7J) Tracer- T unperatur'8 (11/2/7 4): tracer- Shcrt String (J/6I80) :>'pt.., 34' 48' 9272' 8273' 9306' 931 cr 9312' 9312" 9:324' 9357' 10104' 10105' 10,Oß' 10107' 10127' 10128' 51' 8-. 8288' 9271' 9307' 930e' 8310' -' f!' I": : i .. PSTD 10J2S' 1D 10508' j 2 A l J B 20-' 8S & Sil4f CSA. 80:S' 1 3 :118"'54.51 CSA 2001" 7" 231 liner Top at 9429' 14 1 DILLON PLATFORM API # 50-733-201 04-00 S. MGS UNIT # 11 WELL HISTORY Well #11 DATE COMPLETED EVENT 1968 8/26 1969 12/21 1972 7/21 1973 6/29 12/21 1974 8/16 1975 12/10 1977 10/4 1980 9/15 1982 6/29 Completed as an Oil Well. Completed as a Water Injection Well. Perf, Clean out, Acidize, perf Supplement Cement squeeze Repair tubing leak Repai r/squeeze/stimulation Reperf G3-B zone Convert to dual injector Remove junk in hole Reperf 2002 12/10/2002 This well was shut in and isolated at the surface with multiple flanges to isolate the well from surface flow lines. Di-11 Hist 12-21-69.doc, last revised 2/18/2004 page 1 Don Sta dual LEG ROOM #1 2O"x 13 3/8" 13318" x 9 5/8. 9518" x 3 1/'Z' 1 bbIs 28 bbIs 22 bbIs 4 bbIs 15.5bb1s 30 bbIs ~ ~ 01- 13 LEG ROOM #2 E 01-18 20bbIs 01-17 15.5bbIs 20 bbls 01-16 15 bbIs 20bbIs 01-11 5 bbIs 7;4bbIs 01-8 25 bbIs 01-7 ABN-6 ~ LEG ROOM #4 01" 5 -:= ¡abbls ~ 01-3 12 bbIs 25 bbls 20 x 13 SI8 0.1815 300 54.45 31/2 tbg. 0.0087 300 185/8 x 13 3/8 0.1291 300 38.73 2 7/8 tbg. 0.00579 300 133/8 x 9 5/8 ,0.0671 300 20.13 I". 858 334 9 5/8 x dual31/2 0.0507 300 15.21 355 9 518 x dual 2 7/8 0.0571 300 17.13 pump limit 21 psi 9 5/8 x 3 1/2 0.0626 300 18.78 wen #2 welll4 wen #9 wen # 10 wen #13 wen #7 wen #8 Well #11 wen #16 wen 17 wen # 18 wen #3 wen #5 wen # 12 wen #14 wen #15 WELL BAY # 1 Pumped down tbg.tbg on vac, bled down 9 5/8 x tbg. Pumped 28 bbls. Gas still at sudace. Pumped down 20x 135/8 2bbb 100 psi. 20 bbls in 13 3/8, Try to pull eclipse paker with wire line could not get out. Well had 180 on annulus and ISO on tbg would not bleed down, Tryied pumping down short side old pump In hole could not pump. Put 30 bbls of 9.8 in annulur 9 5/8x tbg. Pumped down I.s. tbg. Retumed up short side 100 bbIs. Put 15 bbls In 13 5/8x9 5/8. 4 bbls in 20" ann. Hook up to 20" took approx 1 bbl with charge press on ann. 13 3.8}( ~ 5/8 RumP and bleed 3 bþ~s i~ an~. 9 5/8xtbg fluid packed with oil. 14.4 bblsin tbg. well 10 is abondoned Fill 20" ann 2 bbls, tbg on vac 7bbls in 13 3/8 x 9 5/8 28 bbls 9 5/8 x tbg. 5 1.5. 5 s.s.bbls down short side did tbg. And ann same time WELL BAY # 2 20" fluid packed, 13 3/8 x 9 5/8 2 bbls and started getting diesel fluid back to sudace. Pumped Sbbls in tbg.' 20 bbls in 9 5/8 ann.Annulus and tbg. Have oil returns 0 press on well. 20" fluid packed,13 3/8 x 9 5/8 2 bbls and started getting diesel fluid back to surface. Pumped Sbbls in tbg.' 20 bbls in 9 5/8 ann.Annulus and tbg. Press up to SOO psi. on both tbg. Strings had oil to top no press on tbg. Pumped and bled 7bbls in tbg. Annulus. When annulus was fluid packed. Oil at sudace.5 bbls In 13518 x 9 5/8 press limit. .5 bbls in 20" Well had SOpsf. On 13 3/8x 9 5/8 bleed down to 20psi put bbls of 9.8 fluid, 95/8onn. 20 bbls fluid, tbg.5bbls each, wells 185/8 has 110 psi. bled off and fluid packed with press limit of 50 psi..75 of a bbl. Well had loopsi. On 13 3/8x 9 5/8 bleed down to 20psf put TSbbIs of 9.8 fluid, 95/8onn. 20 bbls fluid, tbg.5bbls each, wells 185/8 has 60 psi. bled off and fluid packed ann with .75 bbls. Well had 150psi. On 13 3/8x 9 5/8 bleed down to 20psi put 2Obb1s of 9.8 fluid, 95/8onn. 20 bbls fluid, tbg.5bb1s each, wells 185/8 has25 psi bled off and fluid packed with 9.8 san took 1.2 bbls. WELL BAY # 4 Rig up pump 4 bbls I.s. 4 bbl 5.5. 9 5/8 x tbg. 25 bbls, 13318 x 9518 fluid packed wI 12 bbls, 20" ann. 2 bbls. Fluid packed Pumped 4 bbls I.s. tbg. 4 bblss.s.R¡u to 9 5/8 x 3 1/2 ann. Pumped 15 bbls fluid packed oil to sudace. Pumped 4bbls down tbg Is, 4 bbls s.s. both went on vac. Pumped 15 bbls 95/8 x31/2. WIfh50 psi press limit 0 bbls in 13 3/8x 95/8 Fluid packed 20x 133/8 2 bbls, Auld packed 13 3/8x9 5/8 12 bbls press up to 200 psi and held. Rig up pump 5 bbls 1.5. 25 bbl s.s. & 9 5/8 x tbg. 8 bbls fluid packed 011 to surface 13 5/8x9 5/8, RIU to 20" ann fluid pack 5 bbls. Press limit 20 psi. Unocal Corporation P.O. Box 196247 Anchorage, AK 99501 Telephone (907) 263-7805 UNOCAL ) -Alaska June 25, 2002 0RIGIN~tL State of Alaska Alaska Oll and Gas Conservation Commission 333 W 7th Ave # 100 Anchorage, Alaska 99501-3539 Attn: Tom Maunder Re: South Middle Ground Shoals Dillon - 11 Dear Mr. Maunder: A temperature survey was run on 5/3/02 which demonstrates that Dillon -11 (Permit # 1680320, S MGS 18746-11) is in static equilibrium and is not flowing. The Dillon 11 has been shut in since 1987, when tubing-to-casing communication developed. The long string is unusable because of wire and wireline tools lost in the hole beginning at a depth of approximately 1,500'. The temperature survey was run in the short string, but bacterial sludge buildup over the years prevented access below 8,000' (7,581 TVDSS). Attached is a plot of the temperature data versus depth. The data shows a smoothly varying temperature gradient from near surface to 8,000'. From 8,000' to the packer at 9,312' are the Tyonek B,C,D,E and F sands, which are wet, non-producing sands in the Dillon area. We conclude that the well is in static equilibrium above the production reservoirs and presents no danger to any fresh water aquifers or shallower reservoirs. We have also attached the well schematic. The water flood system on the Dillon Platform has been disassembled and we are not currently planning to resume further injection on this platform. Enclosed is a 10-403 for your approval. If you have any questions regarding this, please contact myself at 263-7807 or Hal Martin at 263-7675. Enclosures Sincerely, Jeffery J Dolan Waterflood Technician Cook Inlet Waterflood Management Aogcc SMGS Dillon - 11 Apphcat]on for SI MIT rev 1 doc jjd STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS I Type of Request Abandon Suspend Operabon shutdown Re-enter suspended well Alter casing Repmr well Plugging T~me extension Sbmulate Change approved program Pull tubing Vanance X Perforate Other 2 Name of Operator 5 Type of well 6 Datum elevation (DF or KB) Union Oil Company of California (Unocal) Development 100' KB ABOVE MSL feet 3 Address Exploratory 7 Unit or Property name Strabgraph~c PO BOX 190247 ANC, AK. 99519 Service X South Middle Ground Shoal 4 Location of well at surface 8 Well number 699' FSL, 1872' FWL, Sec. 35-T8N-R13W-SM No. 11 At top of producbve ~nterval 9 Permit number 2512' FSL, 2537' FWL, Sec. 35-T8N-R13W-SM 68-32 At effecbve depth 10 APl number 2560' FSL, 2482' FWL, Sec. 35-T8N-R13W-SM 50-733-20104-00 At total depth 11 F~eld/Pool 2578' FSL, 2466' FWL, Sec. 35-T8N-R13W-SM Middle Ground Shoal/"G" 12 Present well cond~bon summary Total depth measured 10,508' feet Plugs (measured) 10,325' true vertical 10,170' feet 10,417' Effective depth measured 10,325' feet Junk (measured) None true verbcal 9,996' feet Casing Length S~ze Cemented Measured depth True verbcal depth Structural Conductor 605' 20" 1205 sx 605' 604' Surface 2501' 13-318" 1600 sx 2001' 1975' Intermediate Producbon 9676' 9-518" 1150 sx 9676' 9356' L,ner 1073' 7" 210sx 9429-10502' Perforation depth measured (See Attached Wellbore Schematic) true vertical JUL 01 2002 Tubing (s~ze, grade, and measured depth) 3 112" N-80 Dual to 9272' 2 718" N-80 Single to 10128' AlaCk8 0il & Gas Cons Packers and SSSV (type and measured depth) BakerMod. 'Fl' ~ 9320' Anchora~. BakerMod. 'Fl' ~ 10120' 13 Attachements Descnpbon summary of proposal Detaded operabons program BOP sketch Well bore schemabc Temperature Survey 14 Esbmated date for commencing operabon 15 Status of well class~ficabon as 16 If proposal well verbally approved Od Gas Suspended Name of approver Date approved Service X 17 I hereby certify th.,,at-t~orego~ng ~s true and correct to the best of my knowledge S~gned T~tle Water flood techmc~an Date 6/25/2002 FOR COMMISSION USE ONLY Conditions OfPlugapproval, ntegntyNot,fy CommlsslOnBopSO representatlVeTest may wltneSSLocatlon clearance~ IApproval No ,~1~-- C:~ '~-Mechamcal Integrity Test ~_ Subsequent form reqmred 10- Ong~nal S~gned By Approved by order of the Commissioner Comm~sstoner Date Form 10-403 Rev 06/15/88 ORIGINAL i SUBMIT IN TRIPLICATE Dillon 11 Temperature Survey- May 3 2002 Temp F. 20 40 60 80 1 O0 120 140 160 1000 2OOO 3000 4000 5000 600O 7000 8000 9000 ~-~ Temperature Ob~,truction 8,000' Packer 9,320' 6/25/2002 9:31 AM Jeff Dolan Dillsqt.20020503.xls Log Run Spud D.~'e: Sur~c~ toc~lom C~$In~: perfofatlonm tnltlal Sttmutatlm: DST h~m~mtB and R~rdl~ SOUTH MIDDLE GROUND SHOAL ADL 1874.6 WELL NO 11 HEMLOCK CONGLOUERATE PLATFORM DIL.t. ON _C?mpleUon Record 1..ag 2, $lcL. 2, SMGS Platform 705' ~ 1874' ~ ~, 35, ~, RI~ 10' 10325' ~: 10417' 20", ~ ~d ~ ~ ~t ~ e05' ~ 1205 ~. 7'. 23~ ~85 ~r ~t ~ 9429-10~2' ~I~ 210 ~. 1~01~I~ 1~9~I011~ ~4: 1014~1~2~ 15,"3 B(~. O B~D. ~2 LICK) N(xle Long String: ~pt~ 1. Tubing Hangs' 34' · . 3 1/2" guttr.~ pupe ~' 3. 3 1~" N-80 g~o ~g 0272' 4. g~ ~ '~ ~g ~ 9273' 6. 27~" ~~ 931~ 7. ~ 19~60 Pa~eI tie. ad 9312' 8. ~k~ 8" ~ I~ ~b g312' 9. ~ ~ ~~ 9324' 10. 2 7,~" b p~ ~ 11. 2 7~" ~ ~ 10104' 12. B~ M~ '~ ha~g ~h 10105' 1~, 2 7~' ~E XO x 2 7~" ~ ~'~l~r 101~' 14. B~ ~22 ~c~r (~d ~ 4" o.d.) 10107' 15. ~ ~ ~ 10127' 16. ~r o~ ~ t 0128' ~ous-~o~. ~ s.. ~d ~: lo) ~0~2-42'. ~ ~. ~ 30.5 1) 1G~2--~, ~ 12, ~d 7': 12)_ ~5~58'. ~ 4', ~ ~' ~~~3 1G~, Q~ 2~,.~d 29': 1~) 100B7-99', ~ 12', ~c~ G' 18 10~87-G~, ~ ~, ~d ~'; 18) .~01G7-2~8', ~ 10', ~d ~r ~Tr, ~ 24% ~d 22' IlS Short Stag: A. 3 1/2" But'minG pup Jt.s B. 3 1/2- N-a0 Buttruo tub~g 92eo. c. i~.r Mod~d 'r' So(ring Mpp~e 027'~' D. 3, 1/2' Buttruoo pup .It 0307' F. 2 7/B** ~0 a~l 3 1/2'* Buttre~ w/'collor 9308' F'. '2 7/B" ~-$~ pup ]% 9310' ?~ ..... ~ 10325' 10508' L 20" 8~ & o4,JJ csA ~05' ~SA 2001' 7'. 2Ns Uflr Top at 0429' 43.fl~ CSA 9~76' 0020' 10110' 10140' 10310' MGS DILLON 1 1 10C 8( 40 2£ 0 1000 ~, 100 10 Water Cut Oil Rate PD/f %bbl/d Gas Rate PD/( Mcf/d Water Rate PUli bbl/d Gas / Oil Rat :f/bt 10: 10 1968 69 70 10 -- Gas Inj Rate (CD) ( Mcf/d ) 8 MGS DILLON 11 21 5OOO 4000 ! j Water Inj Rate (CD) ( bbl/d ) 3000 I 2000 1000 J 1968 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 MGS DILLON Platform Well Pad Alias PTDNO DATE Days On Prod 011 Rate (PD) bbl/d Cum Oil Prod Mbbl Days On WaterIn] Dally Win] Rate bbl/d Cum Water In] Mbbl MGS DILLON _ MGS DILLON MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON MGS DILLON MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 19680831 19680930 19681031 19681130 19681231 19690131 19690228 19690331 19690430 19690531 19690630 19690731 19690831 19690930 19691031 19691130 19691231 19700131 19700228 19700331 19700430 19700531 19700630 19700731 19700831 19700930 19701031 19701130 19701231 19710131 19710228 19710331 19710430 19710531 19710630 19710731 19710831 19710930 19711031 19711130 19711231 19720131 19720229 19720331 19720430 19720531 19720630 19720731 19720831 19720930 19721031 19721130 19721231 19730131 19730228 19730331 19730430 19730531 8 28 31 30 31 30 28 31 29 31 29 29 31 28 . . . . . . . . . 1220 411 630 641 541 633 741 617 573 526 512 332 463 482 * * * * * * * * * * * * * * * * * * * * * * * * * 10 21 41 60 77 96 117 136 152 169 183 193 207 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 7 31 28 31 30 31 30 31 31 30 25 30 31 31 28 31 3O 31 3O 8 7 31 30 30 31 29 31 18 31 30 30 31 27 31 30 31 31 24 31 30 29 3365 4009 3158 4547 4804 4976 4778 4489 4973 4924 1302 1459 1606 1271 1172 1427 1732 1006 916 1855 . 2222 3454 4267 2407 3380 3821 3796 2119 3022 3426 2985 2883 2851 3291 3832 3452 2976 2570 2655 2419 2337 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24 148 236 377 521 676 819 958 1112 1260 1293 1336 1386 1426 1458 1503 1555 1586 1613 1628 1628 1644 1751 1879 1951 2056 2167 2284 2322 2416 2519 2608 2698 2775 2877 2992 3099 3191 3253 3335 3407 3475 Page 1 MGS DILLON _ Platform Well Pad MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON MGS DILLON MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON MGS--DILLON MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ Allas 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 PTDNO 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 DATE ..... 19730731 19730831 19730930 19731031 19731130 19731231 19740131 19740228 19740331 19740430 19740531 19740630 19740731 19740831 19740930 19741031 19741130 19741231 19750131 19750228 19750331 19750430 19750531 19750630 19750731 19750831 19750930 19751031 19751130 19751231 19760131 19760229 19760331 19760430 19760531 19760630 19760731 19760831 19760930 19761031 19761130 19761231 19770131 19770228 19770331 19770430 19770531 19770630 19770731 19770831 19770930 19771031 19771130 19771231 19780131 19780228 19780331 19780430 Days On Prod Oll Rate (PD) bbl/d Cum Oil Prod Mbbl Days On WaterIn] Dally Win] Rate bbl/d 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 31 31 30 31 30 13 . 9 . . . 23 29 31 31 28 31 28 31 30 31 29 25 31 30 31 2 . 31 30 31 28 31 31 30 31 30 29 31 21 8 28 21 26 31 30 30 30 2 3 . . . Ctun Water In3 Mbbl 4159 3328 4768 4332 3651 4109 . 2290 . . . . 3525 3464 3403 3231 2428 2722 3406 3053 2805 2908 3037 2348 2863 2750 2808 1945 3247 3295 3395 3613 3061 3373 3483 3838 3594 3487 3715 3331 4164 3503 3736 3274 2803 2785 2886 3797 4486 92 . . . . 3673 3776 3919 4054 4163 4217 4217 4237 4237 4237 4237 4237 4237 4237 4237 4318 4419 4524 4624 4692 4777 4872 4967 5051 5141 5229 5288 5377 5459 5546 5550 5550 5651 5750 5855 5956 6051 6155 6260 6379 6487 6588 6703 6773 6806 6904 6983 7068 7155 7238 7325 7439 7448 7448 7448 7448 7448 7448 Page 2 MGS DILLON _ Platform Well Pad MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON MGS--DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON Alzas 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 PTDNO 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 DATE Days On Prod 0~1 Rate (PD) bbl/d CL%m Oll Prod Mbbl Days On WaterIn3 Dally Win] Rate bbl/d 19780630 19780731 19780831 19780930 19781031 19781130 19781231 19790131 19790228 19790331 19790430 19790531 19790630 19790731 19790831 19790930 19791031 19791130 19791231 19800131 19800229 19800331 19800430 19800531 19800630 19800731 19800831 19800930 19801031 19801130 19801231 19810131 19810228 19810331 19810430 19810531 19810630 19810731 19810831 19810930 19811031 19811130 19811231 19820131 19820228 19820331 19820430 19820531 19820630 19820731 19820831 19820930 19821031 19821130 19821231 19830131 19830228 19830331 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 221 8 29 30 31 29 31 28 26 29 27 27 30 31 31 25 29 30 26 31 29 29 30 31 30 30 31 29 28 13 . 31 28 31 30 31 30 31 31 23 31 30 31 31 26 31 30 31 29 28 28 30 31 30 31 31 28 29 777 1532 1737 1608 2430 2625 2160 2334 1874 2586 2621 3585 3514 3497 3593 3133 3637 3486 3700 3605 3663 3069 3164 3179 3180 3685 3678 3494 2993 . 384 1392 1680 1650 1465 1784 1842 1851 1821 2105 2208 2096 2340 2001 2089 2171 2147 2276 2596 2297 2606 2565 2568 2662 2807 2718 2991 Cum Water Inj Mbbl 7448 7454 7499 7551 7601 7671 7753 7813 7874 7928 7998 8069 8176 8285 8394 8483 8574 8683 8774 8889 8993 9099 9191 9290 9385 9480 9595 9701 9799 9838 9838 9850 9889 9941 9990 10036 10089 10146 10204 10246 10311 10377 10442 10515 10567 10631 10697 10763 10829 10902 10966 11044 11124 11201 11283 11370 11447 11533 Page 3 MGS DILLON Platform Well Pad MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON MGS--DILLON _ MGS DILLON MGS--DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON MGS DILLON _ MGS DILLON _ MGS DILLON MGS DILLON MGS DILLON _ Alzas 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 PTDNO DATE Days Ozl Cum Days On Rate Ozl On Prod (PD) Prod WaterIn] bbl/d Mbbl * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 * * 221 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 1680320 19830531 19830630 19830731 19830831 19830930 19831031 19831130 19831231 19840131 19840229 19840331 19840430 19840531 19840630 19840731 19840831 19840930 19841031 19841130 19841231 19850131 19850228 19850331 19850430 19850531 19850630 19850731 19850831 19850930 19851031 19851130 19851231 19860131 19860228 19860331 19860430 19860531 19860630 19860731 19860831 19860930 19861031 19861130 19861231 19870131 19870228 19870331 19870430 19870531 Da~ly Cum W~n] Water Rate In] bbl/d Mbbl ......... 31 3310 11740 30 3269 11838 30 3347 11939 31 3251 12039 30 3436 12142 31 3393 12248 28 3573 12348 30 2784 12431 31 2511 12509 29 1984 12567 31 2413 12641 30 1500 12686 31 2306 12758 30 2140 12822 31 2186 12890 31 1922 12949 29 1938 13006 31 2203 13074 30 2336 13144 31 2222 13213 31 2103 13278 24 1983 13326 31 2294 13397 30 1209 13433 29 1358 13472 30 1578 13520 31 1746 13574 31 1833 13631 30 1760 13684 31 1160 13719 30 1484 13764 31 2148 13831 31 2129 13897 28 2190 13958 31 2013 14020 30 2798 14104 31 2674 14187 30 2322 14257 31 2568 14336 31 2574 14416 25 2806 14486 26 3795 14585 29 4003 14701 26 3637 14796 28 3543 14895 27 3684 14994 31 2976 15087 30 3283 15185 12 3463 15227 Page 4 ( Unocal Corporation 909 West 9~ Avenue, P.O. Box 196247 Anchorage, Alaska 99519-6247 UNOCALe December 11, 2001 Tom Maunder State of Alaska Alaska Oil and Gas Conservation Commission 333 W 7th Ave # 100 Anchorage, Alaska 99501-3539 Re: Dillon Shut-in Injection Well, Di-ll Dear Tom: We are asking for a time extension until June 31, 2002 on the MIT for Well 11 while we run temperature survey which is intended to demonstrate the well is in static equilibrium and is not flowing. We ran pressure tests (5/1/01) similar to the tests run in 1997 and obtained ambiguous results. I believe a temperature survey will demonstrate this well's condition. I have attached the pressure surveys, a schematic and 10-403 for your approval. The water flood system on the Dillon Platform has been disassembled and we are not currently planning to resume further injection on this platform. Therefore we ask that you approve the 10-403 granting a time extension for this well. Sincerely, Christopher A. Ruff Senior Reservoir Engineer Cook Inlet Waterflood Management RECEIVED DEC 3 1 2001 \~k-Anchorage\Groups~OGCC\Correspondences\Aogcc Dillon - D1-11 Time Extension for Temp Survey doc car · ' ( STATE OF ALASKA ('~ ,~ ~.L~~I ~~//~"~~ .~ ALASKA OIL AND GAS CONSERVATION COMMISSION~P(r~/ , iz.z~l~ APPLICATION FOR SUNDRY APPROVALS I Type of Request Abandon Suspend. Operabon shutdown Re-enter suspended well Alter casing Repair well Plugging T~me extension X Sbmulate Chan~le approved pro~lrarr Pull tubing. Vanance Perforate ObSer 2 Name of Operate 5 Type of well 6 Datum elevabon (DF or KB Union Oil Company of California {Unocal', Development 100' KB ABOVE MSL feet 3 Address Exploratory 7 Umt or Property name Strabgraphm PO BOX 190247 ANC, AK. 9951,~ Se~ce X South Middle Ground Shoal 4 Locabon of well at surface 8 Well number 699' FSI., 1872' FWL, Sec. 35-TSN-R13W-SIV No. 11 At top of producbve mterve 9 Permit numbe~ 2512' FSI., 2537' FWL, Sec. 35-TSN-R13W-SIV 68-32 At effecbve deplf 10 APl numbel 2560' FSI., 2482' FWL, Sec. 35-T8N-R13W-SIV 50-733-2010400 At total deptl- 11 F~eld/Poo 2578' FSI_, 2466' FWL, Sec. 35-T8N-R13W-SIV Middle Ground Shoal/"G" 12 Present well cond~bon summar Total depth measured 10,508' feel Plugs (measured', 10,325' true verbca 10,170' feet 10,417' Effecbve depth measured 10,325' feet Junk (measured', None true vert~ca 9,996' feet Casing Length S~ze Cementer Measured deptl' True verbcal deptl' Structural Conductor 605' 20" 1205 sx 605' 604' Surface 2501' 13-318" 1600 sx 2001' 1975' Intermediate Producbon 9676' 9-518" 1150 sx 9676' 9356' L~ner 1073' 7" 210 sx 9429-10502' 9110'-10164' Perforabon depth measured (See Attached Wellbore Schematic', true vertlca Tubing (raze, grade, and measured deptl' 3 1/2" N-80 Dual to 9272 2 718" N-80 Single to 10128 Packers and SSSV (type and measured deptl' BakerMod. 'Fl' @ 9320' BakerMod, 'Fl' @ 10120 13 Attachement.~ Descnpbon summary of proposal X Detaded operabons prograrr BOP sketch 14 Esbmated date for commencing operabo 15 Status of well class~hcabon as 16 If proposal well verbally approve( Od Gas Suspended Name of approver Date approved Service X 17 I hereby cerbfy tha~the, forego~n~g ~:~true and correct to the best of my knowled.( S~gned T~tle Semor Reservoir En~l~nee Date 12/20/2001 "'"' ' FOR COMMISSION USE ONLY Cond,t, ons of approval Notify Commlss,on so representative may witness IApproval No ~,~0 Plug ~nteg nty~ BOP Test Locabon clearance /', Mechamcal Integnty Test Subse...quent form required 10- ~ - - - Original Signed By Oechsli Approved by order of the Comm,ss,oner Cammy Comm,ss, oner Date ...~/~'7 Form 10-403 Rev 06/15/88 RECEIVED DEC 3 1 2001 Alaska 0il & Gas Cons. Commission A~chorage SUBMIT IN TRIPLICATE SOUTH UIODLE OROUND SHOAL ADL 1874.6 ~ NO 11 HBULOCK CONOLOMF. RATE PLATFORM DILLON 4./q 7/8B Leg 2, Slet 2. ~ Platfon~ DWon TD -- 257B' PSt.. 2488' rWl.. Sen. 3~, TBN, RI 3W 110' KB--USL 1QSGS' TVO~ 10325' I~/D: 104~ 7' ~, ~ ~85 ~ ~ ~ 942~-10~2' ~ 210 ~. ~ ~2~1~ 1~1~1~ 1~1011~ ~4: 101~1~ 1573 BC~D, g BWPD, 4~2 LK:FD Non4 ~C~). repletion Record Long String: ~pth 1. Tlublng Hanger 34' ~. 3 I/2" Buttr. l~ pup~ 48' 4. B~ ~ ~ ~g ~ 9273' S. 2 7~ 7. ~k~ 19~e0 Po~I flo~ad g312' 8. ~k~ ~ ~ I~ ~ g312' 9. ~ ~ ~~ 9224' 10. 2 11. 2 7~' ~ ~ 10104' 12. B~ M~ ~ ~o~g ~le 101~' 13. 2 7~' 14. ~ ~22 ~e~r (~d h 4' o.d.) I010~ 15. ~ ~ ~ 1012~ le. ~ ~ ~ 10128' uu44-~u?r_._ out 2~_.. ~ 2r: 8) IgTS-~gr. L. ut 20'. reom~md 14' ~1~ ~__~u~_?_o~_', ~ 1_~_, reoavw~ 7: 12}_ 10054-S8', ,ut 4: reeova~ ~.~' // 13 1OOiB--B7', cut 2~', rMWvffml 29': 1.4) I0087-g9', cut 12, 18 10187--07', aut 30, memvamd 30';, 1~) .10197-21~', cut 19; reooveNd lB' 10218--~4', out 18', flaevmfsd 13..S'~ 21] 1~80', mJt 2~', r~c~vered 24' 10~q5-71; ,ut 24'. ~wered 22' ..,. /2/'.2 , _~plrm,r_'rm=,r (e/2~. ~/~7~. ); rro~ ,rm:~r-.T~ntmratur, (1't/2/74.)~ ~Shcrt Stdng ~ 3 1/2" B,,t~ pup ~ ~1' B. 3 1/2" I,,t-80 Buttr.e.~ t,.,dd.g 0289' C. Boker Mod~d 'F' Sooting 1,4fp~e 9271' O. 3 1/2" Buttr8oo pup ,It g307' F.. 2 7,/8" ~0 and 3 1,/'2" Bu~ w/collar 9308' F. 2 ?/~" H-SO pup Jt 9310' al,, lis .......... -- PBTD 1O325' 'IT) 1O508' 20' 85 & CSA 2001' 7" 2NI UMr Top a~ 9429' 4:~..~F cs, 10110' I0140' 10~I0' HFtY 13 '81 · P.4 Proced.u.~ for MIT on Dillon_Di.11 Shut-in Iniector ! , 1. Record daily tubing, casing, and outer casing pressures for a consecutive three day period. , Increase casing pressure by 200 ~si. Continue recording daily tubing, casing. and out~- casiIt$.,pressures [or an additional, consecutive, four-~ay period. · D~te Tubing. Pressure Casing Pre.ute Outer Casing Pressure C~ z.. ]j ~,,,,'/11~ ~.~i~, -,5'~ ~ ~ - ~ ~ ' ; , Spud Sub~uHoc'~ Locotlon: perfomtlon.: InlUal PotenfJM: tnttlai S~mulo~Jom _R_e~wolr Do~o:. Cemd Intewals: SOUTH MIDDLE OROUND SHOAL ADL 187¢6 WELL NO 11 HEMLOCK CONGLOMERATE PLATFORM DILLON 4/1 7/68 leg 2, $1e~ 2. SU(~ Pleffon~ Dtiton 705' ~ 1874' ~ ~. 35, ~ R13W ~ - 257a' ~ 2466' ~. ~0. 35, ~N, RI 3W 110' KB--IdSL 10508' 1M:): 10170' 10325' 'rVD: 10417' 20", 85 and 9_4~1 Caring 13 ~". 54.5~ C~ng 9 ~", ~ ~d ~~95 and N--80 ~lng 9~76' ~ 1150 ~. 7'. 23~ ~95 M~r ~39: 9920-1~0' 1~9~10110' 1D14~1~0' 102~ 1 ~ 1 1573 BCPD. 9 B~I:'D. 432 UCI~ None _O_o_ mple'don Record Long $~,'lng: Depth 1. Tubing Hanger P-,. 3 1/2" Buttree. pupe 48' 3. 3 1/2" N-BO Buttre# tubing 9272' 4. B~ker ldodel 'F' scoring Nipple 9273' 5. 2 7/B" Butt. XO x 3 1/2" ~ XO w/collar 9306* 8. 2 7/8" Buflz~ pup 9310' 7. Bakee 194--DA--80 Parallel tie,head 8. l~ker 6" Seal I~catm. tub 9352' 9. Beker Seal A~embly 9324' 10. 2 7/~" ~ pup 9357' 11. 2 7/8" Bu~r..~ ~ 10104' 12. Baker Model' '~' 5e~tlng Nipple 13. 2 7/8" E'UE XO x 2 7/~" ~ ~,'~l.<zr 14,. B~k~r Q.-.22 Loc~ar (tumid ta ¢. o.d.) 10107' 15. B~ker ~ Ar~nb~y 10127' 16. S~ar out tub 10128' 51' 9289' 9271' 9307' 9308' 931 O' run I~ 1032~' '1~ 105o8' 20' 85 & ~05' CSA LIn,r 9429' 10110' 10310' / ~///~_- Procedure for MIT on Shut-in Dillon Injector D-11 , Record daily Long & Short string tubing, casing, and outer casing pressures for a consecutive three day period. Increase casing pressure 100 psi. Continue recording daily tubing, casing, and outer casing pressures for a consecutive four day period. IWell #: ID-11 Tubing Pressure Date LS SS Casing Pressure Outer Casing Pressure 12/15~97 0 0 0 36 12/16/97 0 0 0 36 12/17/97 0 0 0 36 12/18~97 0 0 120 40 12/19/97 0 0 75 40 12~20~97 0 0 72 40 12/21/97 0 0 70 40 Pressures Recorded By DEO-C~-97 THU 17:54 UNO~' ~$SET G~S GRP NO, 90~37874 P, 04/05 Procedure for MIT on Shut-in Dillon Iniector D-11 . . Record daily Long & Short string tubing, casing, and outer casing pressures for a consecutive three day period. Increase casing pressure 100 psi. Continue recording daily tubing, casing, and outer casing pressures for a consecutive four day period. Tubing Pressure ?~ ie / 3 ~ ~ Date LS SS Casing P ssure Outer Cas!ng Pressure ,, _ 1' ~ ,, Pressures Recorded By: I STATE OF ALASKA A ,<A OIL AND GAS CONSERVATION COM _ .,ION APPLICATION FOR SUNDRY APPROVALS 1 Type of Request Abandon __ Suspend __ Operabon shutdown Alter casing __ Repair well __ Plugging __ Change approved program __ Pull tubing __ Vanance __ 2 Name of Operator J 5 Tvoe of Well Union Oil Company of California (UNbent__ ! Exploratory 3 Address ~w c~ (:[ ~ '~ c~- 6 ~t~raph~c P.O. BOX 196247, Anch. , ~', Jl~J Sew.ce / Re-enter suspended well __ Time extension __ Sbm ulate __ Perforate __ Other. 6 Datum elevate9 (l~r I~,.~T, 7 Unit or Prej~jl~a~it 4 Locat.on of well at sudace Leg #2, Slot 2, Platform Dillon 699' FSL, 1872' FWL, Sec. 35, T8N, R13W, SM At top of producbve ~nterval 2512' FSL, 2537' FWL, Sec. 35, T8N, R13W, SM At effecbve depth 2560' FSL, 2482' FWL, Sec. 35, T8N, R13W, SM At total depth 2578' FSL, 2466 FWL, Sec. 35, T8N, R13W, SM 8 Well number 11 9 Permit number 68-32 10. APl number 50-- 733-20104 11 Reid/Pool SMGS/Hemlock feet 12 Present well condition summary Total depth measured true vertical 10508 ' feet Plugs (measured) 10,325 ' 10170' feet 10,417' Effechve depth measured true vertical 10325' feet 9996 ' feet Junk (measured) Cas, ng Length S~ze Structural Conductor 5 6 4 ' 2 0" Surface 1966 ' 13-3/8" Intermediate Production 9647 ' 9-5/8" 1073 ' 7" Liner Perforabon depth measured true vertical See Cemen~d Measureddepth ~uevert,calde~h 1205 SX 605' 605' 1600 SX 2001' 1975' 1150 SX 9676' 9356' 210 SX 9429'-10502' 9110'-10164' attachment Tubing (s~ze, grade, and measured depth) Packers and SSSV (type and measured depth) 3-1/2", 9.2#, N-80, Dual @ 9272' 2-7/8", 6.5#, N-80, Single @ 10,128' Baker Model F-1 @ 9,320' Baker Model F-1 @ 10,120' ECEIV£D 13 Attachments Descnpt~on summary of proposal __ 14. Estimated date for commencing operation October 281 1991 16. If proposal was verbally approved Name of approver Date approved Detaded operations program BOP sketch __ DEC - 9 1991 15 Status of well classtf,cahon as AIaska 0ii & Gas Cons. C0mrr Od __ Gas __ Suspendec~7~ Anchorage Service Y '"17. I hereby certify,t4~t the foregoing is tru__e, and correct to the best of my knowledge. S~gned '~.~Y~. BUSH Title REGIONAL DRILLING MAN;a~ER (J %_.3 FOR COMMISSION USEONLY Conditions of apP~ov'al' Notify Commission so representative may witness Plug mtegnty ~ BOP Test ~ Locabon clearance ~ Mechanical Integnty Test ~ Subsequent form required 10- Approved by order of the Commissioner ORIGINAL SIGNED BY LOr~NtF C, RMITH ssi0t~ Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE ~ Perforation Record' Platform Dillon [South Middle Ground Shoal # 1 1 ., ".'.'....T...O~".'..-'...!! .... ~.o.~..o'...m. ".i[i ....... T.O.~".'.".i .... i~.'. ~.'0'~.o..~i'"'i iLC....on.d..~t!..o...n.. 9920 10,000 9622 9702 Open ,. 10,010 ...10.:030 9712 9732 . .. Open 10,050 . 10,080 9751 9781 Open 10.090 10,110 = 9791 9811 Open ................................................... G...-....4.. Sand ......... M..e.a..s.d.'~'.'.d..Dep...t..h. .... ~..Tr.u..e~..v...ei~ii~i~b...~F..~ii~i~;~:.ser~{~::~ ............. T~5i5 ....... ii ..... ~ftOi~ ..... ~! ..... TSI5 ........ !! ..... BS~m .... i! Condition 10,140 10,..220 ..... 9840 9919 .... Open .... 10,240 10,310 9938 ~ 0,007 Open P._erUnent D.ata: Spud Date: Surface Location: Subsurface LoBation: Elevation: TD: PBD: Cooing: PerforaUonl: Initial Potential: Initial Stimulation: ]~_eeervolr Data:_ Cored Intervals: DST Intervalo and Reoulto: Log Inventory= SOUTH MIDDLE GROUND SHOAL ADL 18746 WELL NO 11 HEMLOCK CONGLOMERATE PLATFORM DILLON 4/17/"68 Leg 2, Slot 2, SIdGS Platform Dillon 705' FSI., 1874' FWL, Sec. 35, TBN, R13W TI) - 2:570' FSI., 24ce' IrWL, See. 35, TaN. R13W 11 O' KB-IdSL 10508' 1¥D; 10170' 10320' 'rVD: 10417' 20", 85 end 04~ Cooing eot at 805' with 1205 ox. cement 13 3,/9", :54.:51ll Caoln~g Get at 2001' with 1800 ox. cement g 5/B", 40 and 43.:5f S-OS and N-80 Caring oct at g876' with 11S0 ex. cement 7". 23~1 S-G,5 Uner Get at 9429-10502' w!th 210 ex. cement O- 3B: 0920-10000' 10010-10030' 100:50-10080' I0000-10110' G-4: 10140-10220' 10240-10310' 1573 BOPD, g BY,~=D, 432 UCF13 None ._~?mpletlon Record Long String: I. Tubing Hanger 8. 3 1/2" Buttmia pupa 3. 3 1/2" N-BO Buttrees tubing `1. Baker Model 'ir. Seating Nipple :5. 2 7/8" Butt. XO x 3 I/2" Butt. XO w/collar 6. 2 7/8" Buttreso pup ?. Baker l g,I--DA-60 Parallel flowhead 6. Baker 6" Seal Iocator aub g. Baker Seal Aosembly 10. 2 7/1" Buttraos pup 11. 2 7/8" Buttraoo pup 12. Baker Idodel 'F' Seating Nipple 13. 2 7/8" EUE XO x 2 7/8" pln w,'c,o,!~ar 1,1. Baker 0--22 Locator (turned to 4 o.d.) 1:5. Baker Seal Aosembly 16. Shear out sub Short String: A. 3 1/2" Buttraso pup its B. ;3 1/2" N-BO Buttreae tubing C. Baker Model 'F' Seating Nipple D. 3 1/2" Buttreeo pup Jt E. 2 7/8" Y.O and 3 1/2" Buttress w/collar F'. 2 7/8" N-80 pup Jt i! 0730-075B*, cut lg', recovered lg*; 2 ~ oa:5o-oo.o:, out 40:. recovered 40'; 4 0002-0021/cut lO.. rocMred 18.5'; 0046-0076 ,, cut 28/recovered 28'; _ ggge-loo02, cut S, recovered 5*; 10 I 10042-54;, cut 12', recovered 13 10058-87.,cut 2g***recovered 2g';. 1 1000g-127. cut 27. recovered 2g ( 18 10128-38, cut 12', recovered 18 10187-g7', cut :30** recovered 50*; 1 20 10218-34** cut 18', recovered 22 10255-79', out 24** recovered 22' g75B-g783', cut 2:5'. recovered 23.5' 0800--0002% ,cut 12', ,recovered 10.5' B) 9921-99,4..8. cut ,2,7. recovered 2:5. gg?6-ggg8, cut 20, recovered 14' 10002-42', cut 40', recovered 29.5' I0054-58', out 4', recovered 2.5' .) lOOB7-gg', cut 12% recovered 9' '7~)f previous ogre) 1013B-67', cut 20', reaoverad 25' g 10197-216', Gut 10', recovered 19' 1) 10234--60', cut 26', moovered 24' None il~P. _BHC,/GR .(e/2 .o/Be); 4-_Arm Dlpm. eter, OR_ (7/10/68): Or (7/17/68) cer'-Lempera, mre (6/23/70): Tracer (3/24/'/2) nn,r..lraeer (.B/24~/._3, 0/8~_ 3); Traeer (12/12/73) cer~-iemperature (11/2/74); Tracer-Short String (3/6/90) run 1/1B/81) Depth 34' · 48' 9272' 0273' 9306' 931 O' 0312' 0312' 0324' 0357' 10104' 10105' 10106' 10107' 10127' 10128' 51' 8. 9200' 9271' j 9307' 0308' 0310' 14--- 15'- PBTD 10325' 113 10508' [ 20" 8~ & m4~ csx- 605' :_~.~~ 10110' ~10140' 10310' /-////. / ~1' 7" 23dl Liner LTop at g42g' g :~B" 40 & 43.0f CSA gO7e' South Middle Ground Shoal ADL 18746 Well No. 11 Procedure for suspending and freeze protecting well: 1) 2) 3) 4) 5) Run temperature survey from 9312' to surface. Bullhead power oil down both strings to 100'. Both tubing strings will be protected against freezing by power oil at this point. Run hose to 100' inside 9 5/8" casing X tubing annulus. Circulate power oil into 9 5/8" casing X tubing annulus taking returns up hose. The 9 5/8" casing X tubing annulus will be freeze protected at this point. Install blind flanges on all wellhead outlets. Install gauges on the tubing and 9 5/8" casing X tubing annulus. RECEIVED ~ EO - 9 ~,991 Alaska Oil & Gas Cons, CommissiO~ Anchora(~e Amoco Production Company May 24, 1989 M. A. Golas Anchorage, Alaska File: KJO-209-WF Workover Procedure Middle Ground Shoal Well No. 11 Please perform the following workover for the above mentioned well. The authorized gross cost is $50,000 and should be charged to repair well expense. Also, fill out the attached Acid Stimulation Quality Control checklist and return to Denver, following the completion of the workover procedure. 1. Circulate out the pump with a pump extension catcher. Once the pump is in the catcher, circulate an additional 125 barrels of power oil down the short string and up the long string. The wellbore tubular volumes are as follows: Long string to bottomhole assembly: 53 barrels Short string to bottomhole assembly: 62 barrels 2. Rig up a wireline and lubricator and pull standing valve. 3. Pump in a dummy acidizing pump. 4. Mix 61 drums (3360 gallons) of Welchem Super A-Sol with 840 gallons of 35% HCl. This is a 80% Super A-Sol and 20% acid volume mixture resulting in a 7% HC1 acid strength in the stimulation fluid. The acid is to contain 5 gallons of inhibitor and 20 pounds of citric acid sequestering agent. Test the strength of the acid by titration. Circulate the tank thoroughly before pumping the acid/A-Sol mixture. 5. Mix 70 barrels of fresh water with 140 pounds of tetrasodium EDTA. Circulate the tank thorough~ before pumping the acid. ~V~D Al~sl~ Oil & Gas Cons. Anchorage ( Page 2 6. Close the short string and leave the annulus on choke. 7. Pump 100 barrels of the acid/A-sol mixture down the long string. Do not exceed 1 BPM or 3000 psig. 8. Pump 70 barrels of the EDTA mixture. Do not exceed 1 BPM or 3000 psig. 9. Rig down service company. 10. Rig up wireline company and pull dummy acidizing pump. Run standing valve into the hole. Rig down the wireline company. 11. Pump in a jet pump with a 9A throat/nozzle configuration and return the well to production. 12. Obtain the pH of the produced fluid when the well is initially returned to production and hourly for the first 6 hours the well is produced after the worker. Continue to check the pH of the produced fluid every six hours thereafter or until the pH is above 5. Send these results to Tom Harting in Denver. 13. After the well has cleaned up, circulate out the jet pump and install a piston pump. 89131DEN0069 cc: K. J. Overcash R. J. Conner J. A. Krein K. F. Baun R. L. Grainger C. D. Geisert D. J. Rhodes R. W. Brooks T. A. Harting J. L. Hampton Well File Rrr..C J¥ Alaska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA { ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1 Type of Request. Abandon__ Suspend __ Alter casing __ Repair well Change approved program __ Operahon shutdown __ Re-enter suspended well __ Pluggmg __ Time exlenmon ~ Stimulate _Z._ Pull tubng __ Vanance ~ Perforate __ Other __ 2 Name of Operator / 5 Type of Well Amoco Product ion Company Development X__ Exploratory __ 3 Address Strabgraph~c __ P.O. Box 800 Room 1846 Denver, CO 802 1 Serwce__ 4 Location of well at sudace 699' FSL X 1872' FWL Sec. 35 T8N-R13W At top of producbve interval 2512' FSL X 2537' FWL Sec. 35 T8N-R13W At effecbve depth 2560' FSL X 2482' FWL Sec. 35-T8N-R13W At total depth 2578' FSL X 2466' FWL Sec. 35-T8N-R13W 6. Datum elevahon (DF or KB) 100' KB 7. UnR or Property name SMGS 8 Well number 11 9. Permit number 68-32 10. APl number 50-- 733-20104 11. Reid/Pool Hemlock feet 12. Present well cond~bon summary Total depth: measured 10,508 ' true vertical 10,170 ' feet Plugs (measured) feet 10,325' 10,417' Effective depth, measured 10,3 25 ' true verbcal 9,996 ' feet Junk (measured) feet Casing Length Structural Conductor 605 ' Surface 2501 ' Intermediate Production 9676 ' Liner 1073' Perforabon depth: measured true vedical See Tubng (raze, grade, and measured depth) Packers and SSSV (type and measured depth) Size 20" 13 3/8" 9 5/8" 7" attached Cemented 1205 sx 1600 sx 1150 sx 210 sx Measureddepth 605' 2001' 9676' 9429'-10,502 1/2" N-80 Dual to 9272' 7/8" N-80 single to 10,128' Baker Model F-1 @ 9320' Baker Model F-1 @ 10120' ~ueved~caldepth 604' 1975' 9356' 9110' - 10,164 RECEIVED 'JUN 12 i989 Alaska.011 & Gas Cons, C0mr~lst ', N~ch0rage 13 Attachments Oescrlpbon summary of proposal _X_ Wellbore d-ia§ram Detaded operabons program X_ BOP sketch __ 14 Esbmated date for commencing operabon Upon approval 16 tf proposal was verbally approved Name of approver Date approved 15. Status of well class~flcahon as Oil ~ Gas __ Suspended __ Service 17. I hereby cedCy that the.f~egoing is true and correct to the best of my knowledge S,gned ~~¥/~~ J T,tle Sr. admin. Supv. /z/~- / '-j (' L. ,_~St En ~ FOR COMMISSION USE ONLY Conditi~ of approval No~'i~y Comm~'ss~on so represenlaWe may w~tness Plug ~ntegnty __ BOP Test __ Location clearance __ M echamcal lnteg,ty Test __ Approved by order of the Commission Date 6/1/89 I Approval N o. f.._ ,~'~, Subsequent form required 10- Co/-] ' ~pproved CoPY ~'"", ' )- ./'2,~Returned ORiGiNAl- SIGNED BY IONNIE C SMITH Comm,ss, oner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE 011 P_.ertinent Data'.. Spud Date: Surface location: Submarface locafJon: TD: PBD: Ca,lng: Peflora~onm: Initial Pof. entla): InlUal Stimulation: R..~e,ervplr. Data: Cored Interval,: DST Interval, and Lc)g [nventory~ MIDDLE GROUND SHOAL ADL 17595 WELL NO. 11 KENAI ~ LOWER KENAI CONGLOMERATE PLATFORM BAKER 5/14/87 Lag 1, Slot 4 1940' FNL. 543' ~ Sea 31. TgN, R12W. S.U. ~ -- 1892' ~ 847' ~ SEe 31. TgN, 7g' RK5 9543' 9428' 20", g4tl Ca,lng set at 822' wl~ 1345 sx cement 13 3/8", 54.5 and 81J Casing ,et at 2975' wt~ 31Z50 mx cement 9 5/8", 40 and 43.5~ Ca,lng ~et at 9541'; 1,t ,toga: 1300 mx cement. 2nd ~tage: 7035' with 1000 ax cement 7", 2g~l User met. at 5712-9¢74' wlth 700 mc cement A: 5840-5850' 6580--8590' EFQ: 7780-78D0' · 5895-5905' 6645--6655' 7860-7920' BCD: 8105-6115' fl760-6770' 7950-8035° 8180-6190' 6795- 6800' 8060-8070' 621 O- 6220' 8840- 8850' 8120-8140' 8255-6655' ~=0:7105--7115° 8170--8215' 8297--S307' 7145--7155' 8240--831 O' 8340--6350' 7415-7425' * 8350--8470' 6450--6480' 7440-7450' * 8505-a555' 6480-6490' 7680-7745' · 8815-8680' 6535-6545' 7750-7765' , 8685-8720' A zone: 1048 BOPO. OOE 1969 BCD zones: 1515 50PD. OOR 388 EFO zonem: 82~ BOPD. P~)R 526 · Cement squeezed Completion Record long S~n9: Depth I. Cameron 10" NO}J Dual tubing hanger 32' 2. 3 1/2" Buttre,e end 2 7/8" Buttr~,e XO 33' 3. 2 7/8" Buttres, N-SO 6.4~ tubing 9040' 4. 2 7/8" But+,m.. pup 9047' 5. 2 7/8" Buttres, and 2 7/8" 8RD XO 9048' 6. 2 7/8" 8RD pup g054' 7. Notional Type 'V' covlty 907.5' B. 2 7/8" RUE 8RD tallplp~ 9106' g. 2 7/8" Guided Muleahoe 9107' Short String: A. 3 1/2" Buttr~** N-80 g.2~ tubing 5547' B. 3 1/2" Buttrey, and 2 :~/B" Buttr~m, XO 5548' C. 2 3/8" ButLre,, N-BO 4.8~ tubing 9045' D. 2 ~" Bu~e~, and 1 1/4" 10~ XO 9048' ~ I 1/4" lORD pup 9058' 8740-8770' 8800-8920° 89D5-8988o 8975-9000° g020-g050' run EFO zones -- 8685--8898', B825-8834' None IF.S, Sonl~ and Dlpmef~r RECEIVED 12 Alas~ Oil & Gas Con~ C0mmL~d0n ' ~chorage I~D g428' 'iD g543' W G. Smith District Manager Amoco Production Company Post Office Box 100779 Anchorage, Alaska 99510 907-562-2147 March 13, 1987 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention' C. V. Chatterton, Chairman File- FEW-O48-WF Report of Sundry Well Operations SMGS 18746 Well No. 11 Platform Dillon, Cook Inlet, Alaska Attached for your records is a State Form 10-404 reporting the results of a tubing/packer to annulus integrity test run on the subject well. This well failed the State annulus test of November 25, 1986, and on February 10, 1987, Amoco performed tests to demonstrate that there was good integrity from the tubing to the annulus. The results of the test were not conclusive, and on March 6, 1987, Amoco did additional testing which indicated there was direct communication between the short string, long string, and annulus. A State form 10-403 will be sent under separate cover requesting approval to repair the well. Amoco proposes to keep the well active until repairs are made. Very truly yours, ./->.: W. G. Smith Di strict Manager Attachments JCB/dds 048/jcb RECEIVED MAR 2 0 [987 Alaska Oil & Gas Cons. Commission Anchorage Annulus Pressure Test SMGS 18746 Well No. 11 February 10, 1987 Time 12:55 13:00 13:05 13:10 13:15 13:30 13:45 14:00 15:00 16:00 19:00 22:00 01:00 07:00 13:00 ~ t Short String Long String Tubi nq Tubi nc~ Annul us 1,650 psi 1,600 psi 870 psi 0 1,650 1,600 870 5 Min 875 600 770 10 Min 750 400 700 15 Min 700 350 670 30 Min 650 300 640 45 Min 550 200 580 1 Hour 500 100' 550 2 Hours 360 25 460 3 Hours 360 0 460 6 Hours 200 0 360 9 Hours 150 0 325 12 Hours 100 0 300 18 Hours 100 0 300 24 Hours 100 0 300 Comments S.S. Injecting at 1,777 BPD L.S. Injecting at 2,502 BPD Shut- i n wel 1 Annulus Pressure Test SMGS 18746 Well No. 11 March 6, 1987 Time .~, t 12'45 12'55 0 13'00 5 Min 13'30 35 Min 14'00 1 Hr 5 Min. 14:30 1 Hr 35 Min 15'00 2 Hrs 5 Min Short String Tubin_q 1,500 psi. 1,500 950 60O 500 4OO 4OO Long String Tubinq 1,600 psi 1,600, 400 110 25 0 0 Annulus Comments 900 psi S.S. Shut-in since 02/27/87 L.S. Injecting @3,000 B~D 900 S.I. Long String 800 675 625 590 590 STATE OF ALASKA l ALAS¢ OIL AND GAS CONSERVATION COM .SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~ Stimulate [] Plugging [] Perforate [] Pull tubing ~ Alter Camng ~. Other [] 2 Name of Operator 5 Amoco Production Comoanv 3 Address 6 P.0. Box 100779, Anchorage, Alaska 99510 4. Locahon of well at surface 7 699' FSL, 1872' FWL, Sec. 35, T8N, R13W At top of produchve ~nterval 2512'FSL, 2537' FWL, Sec. 35, T8N, R13W At effective depth 2560' FSL, 2482' FWL, Sec. 35, T8N, R13W At total depth 2578' FSL, 2466' FWL, Sec. 35, T8N, R13W Datum elevation (DF or KB) 100' KB Umt or Property name SMGS Well number 8 Approval number 7-72 9 APl number 50-- 733-20104 10 Pool Heml oc k Feet 11. Present well condition summary Total depth, measured '.~'0~508 feet true vertical 10,170 feet Effective depth measured 10,325 feet true vertical 9,996 feet Casing Length Structural Conductor 605 ' Surface 2,501 ' Intermediate Production 9,676 ' Liner 1,073' Perforation depth' measured Plugs (measured) Junk (measured) S~ze Cemented 10,325 Feet 10,417 Feet Measured depth 20" 1205 sx 605' 13 3/8" 1600 sx 2,001' 9 5/8" 1150 sx 7" 210 sx 9,676' 9,429' - 10,502' (See Attached Perforation Record Page) true vertical 3½" N-80 Dual to 2 7/.8" N-80 Single't021feet 927 Tubing (s~ze, grade and measured depth) 0,128 feet True Verhcal depth 604' 1,975' 9,356' 9,110'-10,164' Packers and SSSV (type and measured depth) Baker' Model F-1 at 9,320 feet Baker Model F-1 at 107120 12 St,mulat,on or cement squeeze summaryK~ Intervals treated (measured) MAR 2 Treatment descnphon including volumes used and hnal pressure Alaska 0il & Gas Cons. Commission An~hnr~IA 13 Representative Da~ly Average Produchon or Injechon Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 4200 1650 870 Subsequent to operahon 3000 1600 14 Attachments Da~ly Report of Well Operahons [] Cop~es of Logs and Surveys Run 15 I hereby certify that the foregoing ~s true and correct to the best of my knowledge ..._~1~ ~' -.,~...~ -.~, Signed Form 10-404 Rev 12-1-85 Submit ~n Duplicate Annulus Pressure Test SMGS 18746 Well No. 11 February 10, 1987 Time 12:55 13:00 13:05 13:10 13:15 13:30 13:45 14:00 15:00 16:00 19:00 22:00 01:00 07:00 13:00 ~ t Short String Tubing 1,650 psi Long String Tubinq 1,600 psi Annulus 870 psi 0 1,650 1,600 870 5 Min 875 600 770 10 Min 750 400 700 15 Min 700 350 670 30 Min 650 300 640 45 Min 550 200 580 I Hour 500 100 550 2 Hours 360 25 460 3 Hours 360 0 460 6 Hours 200 0 360 9 Hours 150 0 325 12 Hours 100 0 300 18 Hours 100 0 300 24 Hours 100 0 300 Comments S.S. Injecting at 1,777 BPD L.S. Injecting at 2,502 BPD Shut- i n wel 1 Annulus Pressure Test SMGS 18746 Well No. 11 March 6, 1987 Time 12'45 12'55 0 13'00 5 Min 13- 30 35 Mi n 14'00 1 Hr 5 Min 14:30 1 Hr 35 Min 15:00 2 Hrs 5 Min Short String Tubinq 1,500 psi 1,500 950 600 500 400 400 Long String Tubinq 1,600 psi 1,600 400 110 25 0 0 Annulus Comments 900 psi S.S. Shut-in since 02/27/87 L.S. Injecting @3,000 BPD 900 S.I. Long String 800 675 625 590 590 Perforation Data Sheet SMGS 18746 Well No. 11 Measured Depth (Feet) True Vertical Depth (Feet) 9,920 - 10,000 10,010 - 10,030 10,050 - 10,080 10,090 - 10,110 10,140 - 10,220 10,240 - 10,310 9,598 - 9,678 9,786 - 9,816 9,727 - 9,756 9,766 - 9,786 9,815 - 9,894 9,913 - 9,982 Amoco Production Company Post Off~ce Box 100779 Anchorage, Alaska 99510 907-562-2147 D~str~ct Manager Alaska 0J~ and Gas Conse~va[~on Com~ssJon 300[ Po~cupJne D~Jve File: FEW-O18-WF Application for~Approval SMGS 18746 Well~ Platform Dillon, Cook Inlet, Alaska Attached for your approval is a State Form 10-403 for performing a tubing/packer to annulus integrity test on the subject well. The well is presently injecting and Amoco proposes to maintain injections into the well if it passes the test. Very truly yours, W. G. Smith District Manager Attachments JCB/dds 031/jcb (, STATE OF ALASKA I~, AL A OIL AND GAS CONSERVATION CO ,~ISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operat,on Shutdown [] Re-enter suspended well [] Alter casing E] TIme extensmn ~ Change approved program [] Plugging [] Shmulate [] Pull tubing [] Amend order [] Perforate [] Other 2. Name_ of Operator Amoco Production Company 3'AddrepS.So. BOX 100779, Anchorage, Alaska 99510 4. Location of well at surface 699' FSL, 1872' FWL, Sec. 35, T8N, R13W At top of produchve ~nterval 2512' FSL, 2537' FWL, Sec. 35, T8N, R13W At effective depth 2560' FSL, 2482' FWL, Sec. 35, T8N, R13W At total depth 2578' FSL~ 2466' FWL~ Sec. 35~ TSN~ R13W 11 Present well condition summary Total depth measured true verhcal 10,508 feet 10,170 feet Effechve depth measured 10,325 feet true vertical 9,996 feet 5. Datum elevation (DF or KB) 100' (KB) 6. Unit_or Property name SMGS 7. Well number 11 8. Permit number 68-32 9. APl number 50-- 7RR-?(ll ~4 10. Pool Heml oc k feet Casing Length S~ze Structural Conductor 605' 20" Surface 2,501' 13 3/8" Intermediate Production 9,676' 9 5/8" L~ner 1,073' 7" Plugs (measured) Junk(measured) 10,325 feet 10,417 feet Cemented Measured depth True Vertical depth 1205 sx 605' 604' 1600 sx 2,001' 1,975' 1150 sx 9,676' 9,356' 210 sx 9,429'-10,502 9,110-10,164' Perforahon depth' measured (See Attached Perforation Record Page) true vertical Tubing (s~ze, grade and measured depth) 3½" N-80 Duod to 9,272 feet 2 7/8" N-80 Single to 10,128 feet Packers and SSSV (type and measured depth) 12.Attachments RECEIVED JA?-j 2 7 1 87 Alaska Oil & Gas C-ms. Commission Baker Model F-1 at 9,320 feet Anchorage Baker Model F-] at ]0:120 fePt Descnphon summary of proposal ~ Detmled operahons programJ~ BOP sketch [] 13 Eshmated date for commencing operahon February 10, 1987 14 If proposal was verbally approved Name of approver Date approved 15. I hereby c~tif~j that t_,~,fore~;>ing is true.,~nd correct to the best of my knowledge _~'/~"~ ,~,~..~ Title District Manager Signed Commission Use Only Date 01/23/87 Conditions of approval Approved by Notify commission so representative may witness ! Approval No. [] Plug integrity [] BOP Test [] Location clearance~ Approve,~ ap? Returned Commissioner Subsequent Wor'~,~ Re~oz'te¢] by order of )' the commission Date Submit i~-- "t rip'Jicate Form 10-403 Rev 12-1-85 Perforation Data Sheet SMGS 18746 No. 11 Measured DePth (Feet) 9,920 - 10,000 10,010- 10,030 10,050- 10,080 10,090- 10,110 10,140 - 10,220 10,240- 10,310 True Vertical Depth (Feet)' 9,598 - 9,678 9,786 - 9,816 9,727 - 9,756 9,766 - 9,786 9,815 - 9,894 9,913- 9,982 RECEIVED JA~'J 2 ? !,907 Oil & Gas C-,ns. Oommission Anchorage Description Summary of Proposal Amoco Production Company proposes to demonstrate good tubing/packer to annulus integrity on SMGS 18746 Well No. 11. Referencing telecon between Lonnie Smith and Jeff Blagg on January 20, 1987 and between Blair Wondzell and Jeff Blagg on January 16 1987, and referencing our correspondence dated January 2, 1987, File: FEW-O01-986.511, it is Amoco's understanding that the AOGCC desires this testing in order to ensure that fluids injected are confined to injection strata. The portion of aquifers beneath Cook Inlet described by a one-quarter (1/4) mile area beyond and lying directly below the South Middle Ground Shoal Field are exempt for Class II injection activities by 40 CFR 147.102(b)(2)(B) and 20 AAC 25.440(c) and no fresh water aquifers are effected by injection activities into Well No. 11. /~t~oco proposes to demonstrate that there is no communication from the bing to the annulus by shutting in the injections and monitoring the pressure response of both the tubing and the annulus. If this information is not conclusive, then pressure will be applied to the annulus and the pressure response of the tubing will be measured. If the tests indicate poor tubing/packer to annulus integrity, then Amoco will apply for approval to continue injections until corrective action can take place. Detailed Operations Pro~)ram 1. Record the injecting operating pressure on the tubing and the static pressure on the annulus. 2. Shut in the injections down the tubing for a minimum of 24 hours and monitor the tubing and casing pressure. 3. If the annulus pressure remains constant as the tubing pressure falls off, good tubing/packer to annulus integrity will have been demonstrated. 4. If the annulus pressure does not remain constant or if the tubing and annulus equalize at the same pressure, then pressure will be applied to the annulus and the tubing will be monitored. If the tubing does not respond, good tubing/packer to annulus integrity will have been demonstrated. 5. Return the well to injection. L A Darsow D~st.ct Supenntendent April 2, 1981 Fi le: LAD-435-WF ( I Amoco Production uompan?~, Post Ofhce Box 779 Anchorage. Alaska 99510 907 - 272-8471 ~ONFER: __ FtLF: - Mr. Hoyle H. Hamilton, Commissioner Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: (~Subsequent Report_]of Repair Work "'"'- ~e]l No. 11 Platform Dillon, Cook Inlet, Alaska Attached in duplicate is our State of Alaska Form 10-403, Sundry Notices and Reports on Wells, outlining the recent repair work. The work was completed January 17, 1981, and the subject well operates as a dual string water injection well. Yours very truly, L. A. Darsow District Superintendent Attachment KEO/klt STATE OF ALASKA ~ ALASKAL~L AND GAS CONSERVATION C ,vlMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL rXI OTHER I-I 2 Name of Operator 7 Permit No Amoco Production Company 68-32 3 Address 8 APl Number P. 0. Box 779, Anchorage, Alaska 99510 5o- 7332010400 4 Location of Well Leg 2, Slot 2, SMGS Platform Dillon 2578' FSL, 2466' FWL, Section 35, T8N, R13W, S.M. 5 Elevauon ~n feet (~nd~cate KB, DF, etc ) 110' KB Lease Demgnat,on and Ser,al No SMGS 18746 12 9. Un,t or Lease Name South Middle Ground Shoal 10. Well Number ll 11 F,eld and Pool South Middle Ground Shoal Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO SUBSEQUENT REPORT OF: (Submit m Tr,pl~cate) (Submit m Duplmate) Perforate [] Alter Casing [] - Perforations ~ Altering Cas,ng I-'l Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made )~]] Other [] Pull Tubing [] Other [] Pulhng Tubing ~ (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all perunent detads and g~ve pert,rent dates, ~nclud~ng estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) The following work was performed during the period December 21, 1980 to January 17, 1981' · · . . . Pulled dual 3-1/2" tubing strings. Removed junk at 10,312' MD. Cement squeezed G-1 and G-2 zones, 9630-9670' MD and 9738-9805' MD, respectively. Cement squeezed casing leak at 2329' MD. Reperforated G-3B and G-4 zones, 9920-10,110' MD and 10,140-10,310' HD, respectively. Reran dual tubing strings and returned well to water inject~D~,~t~,a- 14 I hereby certify that the foregoing ~s true and correct to the best of my knowledge The space below for Commission uso Date April 2. 1981 Conditions of Approval, ~f any By Order of Approved by COMMISSIONER the Commission Date Form 10°403 Rev 7-1-80 Submit "lntent,ons" ,n Tr~phcate and "Subsequent Reports" ~n Duphcate L A Darsow District Supenntendent November 7, 1980 Fi 1 e' LAD-1148-WF Mr. Hoyle H. Hamilton, Commissioner Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Amoco Production Company Post Ofhce Box 779 Anchorage, Alaska 995,10 I 1 , / 'I 1 EN~,..,',. - I 2 EN~ ~ 3 ENG ~ 4 ENG ~ ~ 3  STAT TEC STAT TEC I CONFER: Dear Si r: Notice of Intent to Perform Work SMGS Unit Well No. ll Platform Dillon, Cook Inlet, Alaska Attached in triplicate for your approval is our State of Alaska Form 10-403, Sundry Notices and Reports on Wells. We intend to perform repair and cement squeeze work on the subject well. The purpose of this work is to cease injections into the G-2 zone and increase injections into the G-3B and G-4 zones. Yours very truly, L. A. Darsow District Superintendent Attachment KEO/klt NOV AL STATE OF ALASKA ( ALASK ,L AND GAS CONSERVATION C . .MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL I~ OTHER I-I 2 Name of Operator 7 Permit No. Amoco Production Company 68-32 3 Address 8 APl Number P. O. Box 779, Anchorage, Alaska 99510 50- 133-20104 4 Location of Well Leg 2, Slot 2, SMGS Platform Dillon 2578' FSL, 2466' FWL, Section 35, T8N, R13W, S.M. 5 Elevat,on in feet (indicate KB, DF, etc ) 110' KB 12 Lease Designation and Serial No SMGS 18746 9. Umt or Lease Name South Middle Ground Shoal 10. Well Number 11 Field and Pool South Middle Ground Shoal Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO SUBSEQUENT REPORT OF. (Submit m Tnphcate) (Submit m Duplicate) Perforate [] Alter Casing [] - Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well FX] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulhng Tubing [] (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) Amoco plans to repair the subject well and cease injections in the previously cement squeezed G-2 zone as follows' · 2. 3. 4. 5. Pull both strings of tubing and mill out packers. Recover fish at 10,312' MD. Cement squeeze the G-2 zone perforations (9755'-9805' MD). Reperforate the G-3B and G-4 zones. Return to dual injection with the long string injecting into the G-4 zone and the short string injecting into the G-3B zone. 14 I hereby certify that the foregoing is true and correct to the best of my knowledge S,gned ~..~C--~ ~"~~.~ .... T,tle District Superintendent lhe space below for Commission us~ Date 11/7/80 Cond,tlons of Approval, if any ~ ,.. By Order of Approved by /' ~,~ COMMISSIONER the Commission Date Form 10-403 ~ ~ Submit "lntent,ons" ~m Tr~phcate Rev 7-1-80 and "Subsequent Reports" Im Duplicate SCHLUMBERGER OFF'.-';.,HORE SER~'CES ( D,vls,on of Schlumberger L,m,ted ~, J~ P'.', ous 'oN. .o APRIL 9, 1980 .;..........o,,..o.,,,..,../~]~' ~,- 500 W INTERNATIONAL AIRPORT ANCHORAGE' A~SKA 99502 STATE OF ALASKA ~ ~: 2c,' ALASKA OIL AND GAS CONSERVATION COMMISSION JO01 PORCUPINE DRIVE ANCHORAGE, ALASKA D9501 " / AHention: I Gentlemen: 1 RFOLDED SEPI A - CONFE~ Common. AMOCO PRODUCT ION CO , Well SMGS 1 5, D-_3 D-4, D '8 RD Field[ ~OUTH MIDDLE GROUND SHOAL,Coun~ KENAI grote. ALA~ ' Additional prints are being sent to: prints prints . prints prints prints prints prints prints The film is RETURNED TO AMOCO We appreciate the privilege of serving you. /./R E C E I VED , DATE- ~.~4;/~'~ Ve~ truly yours, SCHLUMBERGER OFFSHORE SERVIC~ [ ~r'ik,r~P9 DIST~ |~T &4A~AG~ D,v,s~on of Schlumberg: _ ~ 3 EN ~ ~ce~sr REPLY TO MARCH 26, 19~0 W. I NT~RNAT IONAL AMOCO PRODUCTION COMPANY P.O. BOX 779 ANCHORAGE, ALASKA 99501 Attention' RANDI ROSENBURG 1 ,'(, _ I_COMM/ _ I COMNK. __I-STAT _ I STATTE.C I cONFER` .... Gentlemen: Enclosed orc=~ L 2 prints of the Company AMOCO PRODUCT I ON , Well Field SOUTH MIDDLE GROUND SHOAL .,County ENGINEERED PRODUCTION LOG SOUTH MIDDLE GROUND KENAI SHOAL ~11 State ALASKA AIRPORT F on: Additional prints ore being sent to: LB_L_prints DIVISION PRODUCTION MANAGER DENVER DIVISION SECURITY LIFE BLDG. DENVER, COLORADO 80202 ~_~L__prints CHEVRON U S.A. ; INC_ P.O. BOX ~ 839 ANCHORAGE, ALASKA ATT -MR. KIRKVOLD 1 B L prints DIVISION GEOLOGIST SECURITY LIFE BLDG. EX PLO IT AT ION D:-NVER, COLORADO 80202 1 BL prints GETTY OIL COMPANY T_HREE PARK CENTRAL, SUITE 700 1_.515 ARAPAHOE ST. DENVER, COLORADO 80202 1 B L nrints DEPARTMENT OF NATURAL RESOURCES DIVISION'OF OIL & GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501 ATT- HOYLE HAMILTON 1 B L prints ATLANTIC RICHFIELD P.O. BOX 360 COMPANY ANCHORAGE, ALASKA 99501 The film is RETURNED TO AHOCO DENVER We appreciate the privilege of serving you. 1 B L prints PHILLIPS PETROLEUM COMPANY 7800 EAST DORADO PLACE ENGLEWOOD,.COLORADO 80111 ATT- MR. DENNY prints DATE Very truly yours, SCHLUMBERGER OFFSHORE SERVICES DISTRICT MANAGER L A Darsow Area Superintendent August 31, 1978 File: LAD-840-WF Mr. Hoyle H. Hamilton Division of Oil and Gas Conservation Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Amoco Production Company P 0 Box 779 Anchorage, Alaska 99510 --~ Dear Mr. Hamilton: Subsequent Report of Workover SMGS Unit Well No. 11 Platform Dillon~ Cook Inlet~ Alaska Attached in duplicate is a Form l0-403 submitted as a subsequent report of a workover conducted on SMGS Unit Well No. 11. Yours very truly, L. A. Darsow Area Superintendent RECEIVED Attachments WEN:sis Divi~,ton of 0~1 and Gas Conservation Forr~ ! 0-403 REV. 1-10-73 Submit "1 ntentlons" In Triplicate & "SubseQuent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 0 n WELLL.--] OTHER Water Injection Weii NAME OF OPERATOR AMOCO Production Company 5. APl NUMERICAL CODE 50-133-20104 6. LEASE DESIGNATION AND SERIAL NO. ADL 18746 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME South M.iddle Ground Shoal Unit 3. ADDRESS OF OPERATOR 9. WELL NO. P. O. Box 779, Anchorage, Alaska 99510 il 4. LOCATION OF WELL At surface Leg 2, Slot 2, SMGS Platform Dillon 699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M. 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 110'- MSt KB Check Appropriate Box To Indicate Nature of Notice, Re 14. 10. FIELD AND POOL, OR WILDCAT South Middle Ground Shoal 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 35, T8N, R13W, S.M. 12. PERMIT NO. 68-32 3ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTI PLE COMPLETE ABANDON* CHA~IG E PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTER lNG CAS lNG SNOOTING OR ACIDIZING ABANDONMENT* (Other) Semre~ate Injection I~gerv. p~S (NOTE: Report results of multiple completion on Well Completion or Recompletlon Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent cletalls, and give pertinent dates, including estimated date of starting any proposed work. SMGS Unit Well No. 11 was worked over from June 12, 1978 to July 7,1978 to cease injections into the G-1 and G-2 zones of the Hemlock Conglomerate and segregate injections into the G-3 and G-4 zones as follows: Injection rate before workover: 1. Killed well with filtered Inlet water and pulled 3-1/2" tubing. 2. Drilled out permanent packer at 9365' and cleaned out to 10417' PBD. 3. Set bridge plug (closed retainer) at 10325'. 4. Tested for communication between G-3 and G-4 perle. No communication. 5. Squeezed G-2 perfs 9735-9805' with 300 ex. 6. Squeezed G-1 perle 9630-9670' with lO0 ex. ~ 7. Set 7" permanent packer at 10116' between G-3 zone and G-4 zone. 8. Set 9-5/8" permanent packer at 9315'. 9. Ran dual tubing strings and returned well to injection. 4348 BWPD, 3640 psi (10-77) Injection rate after workover: Short String (G-3 zone) 1532 BWPD, 3650 psi (8-28-78) Long String (G-4 zone) 287 BWPD, 3650 psi (8-28-78) 16. I hereby certify that ~ing is true and correct TITLE ,A_rea Superintendent DATE AU~USt 31. ~978 (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY.' TITLE DATE See Instructions On Reverse Side L A Darsow Area Supenntendent June 2, 1978 File: LAD-577-WF Mr. O. K. Gilbreth, Director Division of Oil and Gas Conservation Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Amoco Production Compan' P o Box 779 Anchorage, Alaska 99,510 Dear Sir: Sundry Notice SMGS Unit Well No. 11 Platform Dillon, Cook Inlet, Alaska Attached in triplicate for your approval is a Form 10-403 for a proposed workover on SMGS Unit Well No. 11 to shut off water injections into the G-1 and G-2 zones and segregate G-3 and G-4 zone injections. This sundry is a replacement for that submitted to you with our letter of November 9, 1977, File: LAD-918-WF, for the referenced well. Yours very truly, L. A. Darsow Area Superintendent Attachments WEN:klt RECEIVED JUN - 5 1978 D. vision of C,I ~nd C;a,s {;ons~,wetion Anchora~ REV. 1-10-73 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE Submit "Iht.nil ,~.s" I. 1 flpllcale & "Subsequent I ' ports" In Duplicate SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such 13roposals.) WELLI--J OTHER Water Injection Well NAME OF OPERATOR Amoco Production Company ADDRESS OF OPERATOR P. O. Box 779, Anchorage, Alaska 99510 4. LOCATION OF WELL At surface Leg 2, Slot 2, SMGS Platform Dillon 699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M. 13. ELEVATIONS (Show whether DF, RT, GR, et~) 110' MSL KB 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-133-20104 6. LEASE DESIGNATION AND SERIAL NO ADL 18746 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME South Middle Ground Shoal Unit 9. WELL NO. 10 FIELD AND POOL, OR WILDCAT South Middle Ground Shoal 11. SEC., T., R., M.. (BOTTOM HOLE OBJECTIVE) Sec. 35, T8N, R13W, S.M. 12. PERMIT NO 68-32 )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT.OFF [___] PULL OR ALTER CASING k___J FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) Segregate in~ection intervals SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) , (NOTE= Report results of multiple completion on Well Coml31etlon or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent Gl.tails, and give pertinent dates, Including estimated date starting any proposed work. This proposed procedure replaces that proposed in Amoco Production Company's Sundry Notice for the referenced well dated November 9, 1977. Amoco proposes to cease injections into the watered-out G-1 and G-2 intervals and segregate injections into the G-3 and G-4 intervals as follows: . Be . 5. 6. 7. Se Pull tubing string and drill out permanent packer at 9365' MD. Set permanent bridge plug at 10,330' MD to stop injections below G-4 interval. Test for communication between G-3 and G-4 intervals and squeeze if communication present. Squeeze G-2 perforations 9738-9805' MD with 100 sacks. !~ E C E I~ E D Squeeze G-1 perforations 9630-9670' MD with 100 sacks. Clean out to 10,330' MD. ~Ui~ ~ 5 Reperforate G-3 interval (9920-10,110' MD) and G-4 interval (10,140-10,310'MD) as required. Set single packer at 10,116' MD and dual packer at 9350' ~i~ el ~l ~,¢t Gas A~h~a~ Run dual injection strings and initiate injections into the C-3 and G-4 intervals. 16. I hereby certify that the foregoing Is true and correct TITLE Area Superintendent June 2 1978 DATE ' (This space for State office use) CONDITIONS OF APPROVAL, IF AN~j~ Pet rD leum En Binee r See Instructions On Reverse Side DATE June 7, 1978 Copy L A Darsow Area Supermtenden! November 9, 1977 File: LAD-918-WF Mr. O. K. Gilbreth, Director Division of Oil and Gas Conservation Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Amoco Production Company Anchorage, Alaska 99510 Dear Sir: Notice of Intent to Perform Well Work SMGS 18746 Well No. 11 Platform Di!lon~ Cook Inlet~ Alaska Please find attached in triplicate for your approval our State F_~rm 10-403~.: to perform injection profile improvement work on the subject wel~%~_~~~ purpose of this work is two fold: (1) reduce water cycling through the more permeable G-1 and G-2 benches by restricting water injection volumes into these pay intervals and (2) increase injections into the tighter G-3 and G-4 benches by increasing the surface injection pressure for these intervals. The anticipated starting date for this work is December 7, 1977. Yours very truly, L. A. Darsow Area Superintendent Attachment JSD:klt Form 10-403 REV. 1-10-73 Submit "intentions" In Triplicate [ & "Subsequent Reports" In Duplloa~ STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT---" for such proposals.) o,L F--1 GAs ~ WELLL-J WELL OTHER Water Injector NAME OF OPERATOR Amoco Production Company 5. APl NUMERICAL CODE 50-133-20104 LEASE DESIGNATION AND SERIAL NO. ADL 18746 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME SMGS Unit [ ADOR~SOFOPERATOR 9. WELL NO. P. O. Box 779, Anchorage, Alaska 99510 11 4. LOCATION OF WELL Atsurface Leg 2, Slot 2, SMGS Platform "D" 699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M. 13. ELEVATIONS (Show whether DF, RT, GR, et~) ll0' MSL - KB Check Appropriate Box To Indicate Nature of Notice, Re 14. 10. FIELD AND POOL, OR WILDCAT South Middle Ground Shoal 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 35, T8N, R13W, S.M. 12. PERMIT NO. 68-32 )ort, or Other Data NOTICE OF INTENTION TO*' TEST WATER SHUT-OFF r'~ PULL OR ALTER CASING FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR AClDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) Segregate injection intervals SUBSEQUENT REPORT OF: WATER SHUT-OFF : REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR AClDIZING ABANDONMENT* (Other) (NOTE= Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all I~ertlnent details, and give pertinent dates, Includ,ng estimated date of starting any proposed work. Operator proposes to segregate the G-1 and G-2 benches of the Lower Kenai Conglomerate from the less permeable G-3 and G-4 benches as follows: 1. Pull present tubing (single string). 2. Recover present injection packer. 3. Clean to PBTD. 4. Test for behind-pipe communication between G-2 and G-3 intervals and cement squeeze if necessary. 5. Install dual packers (one between G-2 and G-3 and one above G-&). 6. Run dual tubing strings with one string extending between packers for injection into lower intervals (G-3 and G-4). 7. Return well to injection. Anticipated starting date for this work is December 7, 1977. ~ ~ 16. I I~ereby certify that tt~.~ re.~.~n_g Is true and correct Area DATE November 9, 1977 (This space for State office use) · TITLE CONDITIONS OF/A~PROVAL, IF ANY: See Instructions On Reverse Side Apl~m~d Form 10-403 REV. 1-10-~,? 3 Submit "lntentlo,,," In Triplicate & "Subsequent i:,'uports" In Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proPosals.) OIL I---I GAs [~ WELLL.-J WELL OTHER Water Injector NAME OF OPERATOR Amoco ;Production Company 5. APl NUMERICAL CODE 50-133-20104 6. LEASE DESIGNATION AND SERIAL NO. ADL 18746 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME SMGS Unit ADDRESS OF OPERATOR 9. WELL NO. P. O. Box 779, Anchorage, Alaska 99510 11 4. LOCATION OF WELL At surface Leg 2, Slot 2, SMGS Platform "D" 699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M. 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 110' MSL - KB Check Appropriate Box To Indicate Nature of Notice, Re 14. 10. FIELD AND POOL, OR WILDCAT South Middle Ground Shoal 11. SEC., T., R., M., (BO~-TOM HOLE OBJECTIVE) Sec. 35, T8N, R13W, S.M. 12. PERMIT NO. 68-32 ~ort, or Other Data NOTICE OF INTENTION TO: TEST WA~ER SHUT-OFF ~ PULL OR ALTER CASING FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) Segregate injection intervals SUBSEQUENT REPORT OF WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) {NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, anti give pertinent dates, Including estimated date of starting any proposed work. Operator proposes to segregate the G-1 and G-2 benches of the Lower Kenai Conglomerate from the less permeable G-3 and G-4 benches as follows: le 2. 3. 4. e e Anticipated starting date for this work is December 7, 1977. Pull present tubing (single string). Recover present injection packer. Clean to PBTD. Test for behind-pipe communication between G-2 and G-3 intelvals and cement squeeze if necessary. Install dual packers (one between G-2 and G-3 and one above G-l). Run dual tubing strings with one gtring extending between packers for injection into lower intervals (G-3 and G-4). Return well to injection. ~ , 16. I hereby certify that th~..forego?g is true and correct SIGNED '~Lz'%(' TITLE Area Superintendent DATE November 9, 1977 (This space for State office use) APPROVED By~ C ~/~ __i CONDITIONS O~APPROVAL, IF ANY: See Instructions On Reverse Side DATE Approved Copy Form No P--4 ]?~J~r a- I-?0 ( STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS OIL [] WELL WELL Water Injection NAME OF OPERATOR Amoco Production Company ADD~ or OPn%ATOR P. 0. Box 779, Anchorage, Alaska LOCATION OF Leg 2, Slot 2, SMGS Platform "D," 699' FSL, 1872' F~L, Sec. 35, TSN, R13W, $.H. SUBMrT l~ DUPLICA~ 99510 APl NL~i~K/CAL CODE 50-133-20104 LEJkSE DESIGNATION AND S~RIAL NO ADL-18746 IF INDiA~ AL,Of i~1-- OR TRIBE 8 L~IT F)J{A4 OR LEASE NA~E SMG S Un! t 11 l0 F~D ~D P~L OR WILDCAT ~outh Middle Gro~d Shoal h S~ T R M (~OM HO~ O~~ _Sec. 35, T8N, R13W, S.M. . 68-32 REPORT TOTAL D~-'rl~ AT END OF MONTH CHA~N'G~S IN HOLE SIZE CARING AND C~WIF~NT/NG JOBS INCLUDING DEPTH SET AND VOLI3%VIES USED PEP,.FOHATIONS. TESTS ANT) RESULTS FISHING JOBS JLq~IK IAI HOLE AND SIDE-TI~ACKED HOLE AND ANY OTHiEI% SIGNIFICANT CHANGES IN HOLE CONDITIONS ~S~ummary .of. Operations for the Month of October 1974: October 1-3: October 4-6: Set bridge plug at 10,122', spotted 28 sacks Class G cement containing .4% R-5 on top of bridge plug, set packer at 9480' and cement squeezed into perforations 10,090-10,110' with 2000 psi surface pressure. Drilled out cement from 10,115' through 10,122'. Pushed bridge plug to bottom of the hole and set packer at 10,040'. Acidized the following perforations: 10,050-10,080'; 10,090-10,110'; 10,140-10,220'; and 10,240-10,310' with 417 barrels of 12-10 mud acid at 4000 psi and had communication. Displaced annulus with filtered inlet water. October 7-8: Set 9-5/8" Model "D" packer at 9350'. Tested seal assembly and ran 3-1/2" Buttress tubing. Hydrotested to 5000 psi. Displaced annulus with treated water and landed tubing. Installed the tree and tested to 3000 psi and started in3ection. October 17: Injecting at 3870 BWPD with 3400 psi pressure. Final Report. Area Superintendent November 13, 1974 oil Ond gOS conservation committee bytho 15th of the succeeding month, unle~ otherwise d~rocted. ~ ~o ~-.~ STATE ALASKA ~ ~- 1-70 OIL AND GAS CONSERVATION COMMITTEE SUBMrT I~ D[~LICAT~ MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS I OIL l"'] o,, ~ o~,,,-, Water Injection WELL WELL 2 NAM~ OF OPerATOR Amoco Production Company 3 ~DR~SS or o~~ P. O. Box 779, Anchorage, Alaska 99510 4 ~CA~ON OF w~ Leg 2, Slot 2, SMGS Platform "D" 699' FSL 1872' FWL, Sec. 35, T8N, R13W, S.M. AP1 NL'~.{ERICAL CODE 50-133-20104 LEASE DE~:GNA?ION A.%'D SEIRIAL NO ADL-18746 IF INDiA~ A~7~ O~ TRIBE L~IT F.~ OR LEASE SMGS Unit W~ NO 11 l0 FLELD A_ND i~OOL OR WILDCAT South Middle Ground Shoal 11 SEC T R M (BO'I~I'OM HOL,~ o~ Sec. 35, T8N, R13W, S.M. 12 PER.MIT ~0 68-32 13 REPORT TOTAL DEl>TH AT END OF MONTH CHANGES IN HOLE SIZE CA,~ING AND C~/IENTING JOBS INCLUDING DEPTH SET AND VOL~ USED PERFORATIONS. ?ESTS A.ND RESULTS FISHI~TG JOB~ JL~"NK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CI-'LA. NGES IN HOLE CONDITIONS Summary ._of Op.erations During, ..September 1974: September 14-17: Pulled the tubing and cleaned out the hole to 9459'. Milled over and retrieved the packer at 9530'. September 17-19: Set cement retainer at 2188' and bridge plug at 2403'. Cement squeezed casing leak with 185 sacks of Class "G" cement. September 20-22: Drilled out cement from 2188-2390' and pressure tested the annulus to 1000 psi. Held okay. Cleaned out the hole to PBD. September 23-27: Cement squeezed G-3A zone from 9820-9927' with 200 sacks of Class "G" cement under 3000 psi pres- sure. Drilled out the cement and pressure tested to 2000 psi. Bled to 1150 psi in 15 minutes. Cleaned out the hole to 10,417'. September 28-30: Ran bridge plug and packer for acid st/mulation of the G-4 zone and found communication between the zones. Presently PreParing to cement squeeze to shut off communication. ~ ~ ~ ~ ~ ~ ~ ~ OCT 9 i : 74 SmN~D - ~ Area Superintendent DA~ October 4, 1974 NOTE--Report on this form ii required for each calendar moflth~ regardless of the status of al)orations, and must bo filed in duplicate with the oil and gas conservation committee bythe 15th of the euoceecling month, u~le~ otherwise d,rected. Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 September 17, 1974 Pile: GJR-638-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Re: Sundry Notices and Reports on Wells South Middle Ground Shoal Unit Well No. 11 Attached is a State of Alaska Form 10-403 requesting permission for a workover of SMGS 18746 Well No. 11 as described herein. Yours very truly, George J. Ross Area Superintendent CONFER: FILE: Attachment SF..f' t 9 'i974 Form 10-403 REV I ( STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE ~bmit "Intentions'* in Trtplio~t~ ~'~ ~ & 'Subsequent Reports" m Ouphcmte ~ AP1 NUlV~FA~ACAL CODE 50-133-20104 6 LEASE DEff~IGNA~ION A-ND SERIAL NO SUNDRY NOTICES AND REPORTS ON WELLS (Do not use th~s form for proposals to drill or to deepen Use APPLICATION FOR PER~II'-2-'' for such pro~o~als ) oil ~ OAS ~--I WELL ~__ WELL~ OTHEE Water Injection 2 NAME OF OPERATOR Amoco Production Company 3 ADDRESS OF OPERATOR P. O. Box 779, Anchora~e~ Alaska 99510 4 LOCATION OF WELL At sut face Leg 2, Slot 2, SMGS Platform "D" 699' FSL, 1872' FWL, Sec. 35, TEN, R13W, S.M. 13 ELEVATIONS (Show whether DF, RT, GR, etc Check Appropriate Box To I,nclicate Nature of N~tice, Re ADL-18746 ? IF INDIAN, ~TTEE OR TRIBE NAME UNIT, F2A{NI OR LEASE NA/YIE SMGS Unit g. %NELL NO 11 10 FIELD A~D POOL, OR WILDCAT South Middle Ground Shoal 11 SEC , T , R , M , (BOTTOM HOL~ OBJECTIVE) Sec. 35, T8N, R13W, 12 Pr~M2~IIT NO 68-32 mrtorO~h~Da~o S.Mo EUBIEQ~ENT RBPOIT OF: NOTICE OF INTENTION ~0: ~ CHANGE PLANE __ FRACTLRE TREAT MULTIPLE COMPI,ETE FRACTURE TREATMENT ALTERING CASING SHOOT OR ACIDIZE ABANDONs SHOOTING OR ACIDIZING ABANDONMENTs REPAIR V, ELL (Other) ~Other) (NOTE: Report results of multiple completion on Well Completion or Reeompletion Report and Los form.) ~ scans Pnoeoss, os C0~t*L~D 0PZ~aTmxS (Clea~l~ state all pertinent details, and giv~ pertinent dRtes, includln~ estimated dRte 0f startin$ an> proposed work. We propose to repair a casing leak at about 2300' by cement squeezing the leak with 150 sacks Class G cement. Perforate G-3A zone from 9870-9900' with 2 JSPF, and cement squeeze the G-3A perforations 9870-9900' and the top ten feet, 9920-9930' of the G-3B perforations with 200 sacks of Class G cement. Acidize the G-4 zone perforations: Perforations Treatment 10,240-10,310' 7000 gallons 12-10 Ultra Mud Acid~ 10,140-10,220' 7000 gallons 12-10 Ultra Mud Acid Reinstall downhole equipment and tubing and put on injection. Work is anticipated to begin September 14, 1974. Area Superintendent na?~September 17, 1974 !, CONDITIONS 0'F ~PPROVAL, IF ANal: TITLE See Instructions On Reverse Side ~proved Co,. y _ Rot~rne .d i Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 October 10, 19 73 File: WMJ-540-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Re: Monthly Report of Drilling and Workover Operations SMGS Unit Well No. 11 SMGS Unit Well No. 12 MGS 17595 Well No. 4 --'j-'-I GFOL_i~I t 2 GEOL --I 3 GEOL REV DRAFT SEC CONFER: FILE. Attached are State of Alaska Forms P-4 reporting workover operations on the above wells for the month of September 1973. Yo~s very t~ul~ Dis trict (;~uction Superintendent Attachments ANCh <.4:i;,--,O'-:, ~Fm'm Ho P--4 ~ S- I-?0 ,STATE O~F ALASKA OIL AND GAS CONSERVATION COMAAI'I-i'EE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS On.~.~LL [--'] O*,,.,~.L [--'J 0'~"," Water In~ection ~ N~ OF OPhiR ~oco Production Com~an7 3 ~D~S OF OPhiR P. O. Box 779~ Anchorage~ Alaska 4 ~CA~ON OF W~ At Surface: SUBMIT IN I~ol~LICA'I~: 99510 Leg 2, Slot 2, SMGS Platform "D," 699' FSL, 1872' FWL, Sec. 35, T8N, Ri3W, S.M. APl NI~{ERICAL CODE 50-133-20104 6 LE~SE DESiGNAT'ION A\-D S~RIAL NO ~ ADL-18746 I '; IFINDIA]~ AIADTTEE OR TRIBE NAME 8 L.~IT F.~:LM OR LEASE NAME SMGS Unit 9 w~ NO 11 lO iu'k!~r~ AND POOL OR WILDCAT South Middle Ground Shoal n sm: T ~, ~ (~o~-o~,~ ~OL~ oa,mc-rzv~ Sec. 35, T8N, R13W, S.M. 12 PEP.MIT NO 68-32 13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE CASING AND C~--'~F_.NTING JOBS INCLUDING DEPTH SET AND VOLLtMES USED PERFORATIONS, 'rESTS AND RESULTS FISHING JOB~ JUNK IN HOLE AND SIDE-'FROCKED HOLE AND A.NY OTHER SIGNIFICANT CliANGES IN HOLE CONDITIONS Summary of Operations for September 1973: September 1 - 5: September 6 - 7: Injecting water. Ran spinner and radioactive tracer surveys and lost tools and wireline in hole. Recovered survey tools and wireline and returned well to water injection service. Operations complete September 7, 1973. Final Report. ~!'l!$lC~ 0i~ Ot~ ~b~'D GAS Ab!CHORAG~ 14 I hereby cert oorr~,et ~ NOTE ~Report on this fo~4quired for eO~ calendar ~ths regardless of the status of operations, Qnd must ~ filed In duplicate with the oil and gas con~.a~n ¢ommiHee bythe IS~ of the suQ=~ing ~n~, ~le~ otherwise d~rected. Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 October 10, 19 73 File: WMJ-541-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Re: Sundry Notices SMGS Unit Well No. 11 SMGS Unit Well No. 12 Attached are State of Alaska Forms 10-403 transmitting our subsequent reports of workovers to improve water injection profiles in the sub- j ect wells. ~rs very true, w. District ~r0duction Superintendent Attachments Form I0 -403 I~EV I - t0-75 ( STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE I~abmlt "Intentions" in Trtplimte f & 'Sul~equent Reports" m Duphc~t~ '5 AP1 NUMEI~CAL CODE ' 50-133-20104 S LEASE DESIGNATION A.ND S~ NO SUNDRY NOTICES AND REPORTS ON WELLS (Do not u~e this form for proposals to dlHl or to deepen Use APPLICATION FOR f~ll'-2" for such pro~als ) oil ~ GAS WiLL , ' WELL~ OTHER Water Injection NAME OF OPERATOR Amoco Production Compan7 ADDRESS OF OPERATOR P. 0. Box 779, Anchorase, Alaska 99510 4 LOCATION OF WELL ^tsu, face Leg 2, Slot 2, SMGS Platform "D," 699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M. 13 ELEVATIONS (Show whether DF, RT, GR, etc RKB 100' above MSL 14 Check Appropriate Box To I,ndicate N~ture of I~tice, Re NOTICe 0F IN~N~ION TO: PULL oa ALTEa CA*IN6 MCLTIPL[ COMPI,~T~ ABANDONs CHANG~ PLANS TEST WATER SHUT-OFF FRACT~ RE TREAT SHOOT oa ACID~ZJJ REPAIR 1% ELL ADL-18746 ~ IF INDIA2~, ~J~bO'~-r~ OH THJBE N~ 8 UNIT, FA. Ih~ OR LEASE NAME SMGS Unit 9. WELL NO 11 10 FIELD AND POOL, OR WILDCAT South l~ddle Ground Shoal 11 SEC , T , R , M , (BOTTOM HOL~E OBJECTIVE) Sec. 35, T8N~ R13W~ S.M. 12 PER/VI~T NO 68-32 ~, or Other ~UBIEQUENT RBPOIT OF: WaTeR SHUT-Orr J RBPAZa~NO W~LL raacTca~ TR~AT~r~N~ ! ~LT~aXNG C*SZNG SHOOTING OR ACIDIZING ABANDONMENT* (O~heF) (NOT~: Report re,ults of multiple completion on Well ~Other) ComDletion or Recompletion RePOrt and Log form.) 15 DI',qCRIBEI'ROPOSED OR COMPLETED OPERATIO.~S (Clearly stats'all pertlneut details, and ~tv~ pertinent dates, including estimated date of starting an} proposed work, Operations to improve the water injection profile of this well commenced August 20, 1973. Pulled injection tubing and milled out permanent packers at 9549' and 9570'. Cleaned out interval 9908-10,050' with bit and casing scraper. Ran retrievable packer and set at 9840'. Performed spinner and radioactive tracer surveys of perforated intervals 9870 - 9900' and 9920 - 10,000'. Confirmed no communication between these intervals. Cleaned out to 10,445' with bit and circulated hole. Ran Gamma-Ray Collar Correlation Log 9450- 10,445'. Perforated 9630-9670'; 9930-10,000'; 10,010- 10,030'; 10,050-10,080'; 10,090-10,110'; 10,140-10,220'; and 10,240-10,310' with 2 JSPF. Set permanent packer on wireline at 9530' and ran injection tubing and commenced water injections at 11:00 p.m., 8-27-73. In- jection rate 8-28-73, 5679 BWPD at 2950 psig. Performed spinner and radioactive tracer survey 9-6-73 and lost survey tools and wireline in hole. Recovered survey tools and wireline 9-7-73 and resumed water injections. Operations complete 9-7-73. Water injection rate prior to workover: 4414 BWPD at 3000 psig on 8-14-73. Rate subsequent to workover: 5005 BWPD at 2850 psig on 9-11-73. Final Report. 16 I hereby and correct SIGNED TITLE Dist. Production Supt. (This ,pace for S~~,~r~ ~' ~ APPROVED BY--~-~*'"~ TITLE CONDITIONS OF IF ANY: ~ IntruSions ~ Reve~ Side DaTZ October 10, 1973 I/~ OCT ~ s- ,-?o ,STATE ,' ALASKA OIL AND GAS CONSERVATION COMMITrEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS OIL WgLL ~ GAB w,LL [~ o~,,,,j Water Injection ~oco Production Comply P. O. Box 779, ~chora~Al~ka 4 LOCA~ON OF WF~ At Surface: STJBMrr II~ ~LICA'r~ 99510 Leg 2, Slot 2, SMGS Platform "D," 699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M. ^P~ ~{~mc~ c6D~' " ' 50-133-20104 ADL-18746 SMGS Unit 11 _ Sq.uth Middle Ground Shoal 1I SEC T, R , 1%{ (~%"7~M HOL~ o~ _Sec~ 35, T8N, R13W, S.M. ~ ~[T NO 13 REPORT TOTAL DEPTH AT ~ND OF MON~VH CI~\'GES IN HOLE SiZe, CASING A~ C~NG JOBS INCLUDING DEP~ SET ~ VOL~ UiD P~O~TIONS, ~TS ~ ~SUL~ FISHING JO~ J~K ~ HO~ ~D SIDE-~CK~ HO~ ~D ~Y O~ SIGNIFIC~T ~G~ ~ HO~ ~ITIONS Sum~.ary of OPe.rations During August 1973: August 20 - 23: Shut in well August 20. Pulled injection tubing and milled out permanent packers at 9549' and 9570'. Cleaned out interval 9908 - 10,050'. Aug ust 24-27: Ran retrievable packer and set at 9840' and ran spinner and radioactive tracer surveys across perforated intervals 9870- 9900' and 9920- 10,000' and confirmed no communica- tion between these intervals. Cleaned out to 10,445' and ran Gamma-Ray Collar-Correlation log 9450 - 10,445'. Per- forated following intervals with 2 JSPF: 9630- 9670'; 9930-10,000'; 10,010-10,030'; 10,050-10,080'; 10,090- 10,110'; 10,140-10,220'; and 10,240-10,310'. Set perman- ent packer on wireline at 9530'. Ran injection tubing and returned well to water injection service. August 28- 31: Injecting water. ( Mm No p~ STATE OF ALASKA ~ B- I-?0 OIL AND GAS CONSERVATION COMMITTEE SUBMIT IN DUPLICATE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 0XLWZLL ~--~ G,O.=LL ~] OTnZ, Water Injection NAME OF OP~%ATOR Amoco Production Com~an7 ADDRESS OF OPERATOR P. O. Box 779~ Anchorage: Alaska 99510 4 LOCATION OF WElL Surface: Leg 2, Slot 2, SMGS Platform "D," 699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M. ~ APl NU~fERICAL CODE 50-133-20104 LEASE DF~iGNATION A\-D S~IAL NO ~L-18746 IF I~IA~ A~T~ O~ TRIBE NAME 8 L~IT F.%~{ OR LEASE SMGS Unit 9 WELL NO 11 10 FLF-~ A_ND POOL OR WILDCAT South Middle Ground Shoal 11 SEC T R, M (BOI'TOM HOLE Sec. 35, T8N, R13W, S.M. 12 PER.MIT NO 68-32 13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMI~ USED PERFORATIONS, TESTS ~ RESULTS FISHING JOI~ JLrNK IH HOLE AND SIDE-TRACKED HOLE A_ND ANY OTHER SIGNIFICANT CHANGES IN HOL~ CONDITIONS S~mmary of operations During July 1973: Workover deferred due to revisions to procedure; revised notice of intent submitted for approval August 14, 1973. 14 I hereby ce _ true and eor~ smx~v/,4 ~// ~//~~~ TXT~ District Production Supt,,~ August 22, 1973 oil Q~nle~commi~ee by the 15~ of the eucc~ding ~n~, ~le. Otherwise &rected. August 14, 1973 File: WMJ-438-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 REV - DRAPT _ _ -FILE= Re: Sundry Notice of Intent Perforating SMGS Unit Well No. 11 Attached for your approval is a State of Alaska Form 10-403 reporting our intent to clean out, cement squeeze a thief zone if necessary, and perforate selected intervals in this well to improve the water injec- tion profile. This is a change of plans from our original sundry dated May 21, 1973. We expect to begin about August 27, 1973. w. Distri~oduction Superintendent Attachment AtJ 5 D?i!_"-.ICN OF OIL Al,ID GAS ANCHORAG~ Form I 0 REV. I - 10-7'J~_ ~bmit "Int~ntions" in Triplicate & "Sub~eq-ent Reports" in Duplic~te STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON wLq. Ls (Do not use this form /or proposals to drill or to deepen Use "APP-LICATION 'FOR ~'EB~I'i'---'" 'for such 'p~o~osah[) OIL ~ GAS ~,.~. ~ELL [] OT~ER Water Injection 2. NAME OF OPERATOR Amoco Production Company 3. ADDRESS OF OPERATOR P. 0. Box 779, Anchorage, Alaska ~9~;I-0 4. LOCATION OF WELL ^t ~u,-~.~ce Leg 2, Slot 2, SMGS Platform "D," 699' FSL, 1872' ~'~L, Sec. 35, T8N, R13W, S.M. 13. ELEVATIONS (Show whether DF, RT, GR, etc. RKB 100' above MSt 14. Check Appropriate l~X To I,ncJlcate Nature of N~tice, Re 5. APl NUiVLF22CAL CODE 50-133-20104 $. LEASE DESIGNATION A.ND SERIAL NO, ADL-18746 7. IF INDIA.N, ALLOTTEE OR TRIBE N,MVI. E 8. UNIT, FA/~VI OR LEASE NAME SMGS Unit 9. WELL NO. 11 10. FIELD AND POOL, OR WILDCAT South Middle Ground Shoal 11. SEC., T., R., M., (BOTTOM HOL~ OBJECTIVE) Sec. 35, T8N, R13W, S.M. 12. PEI~T NO. 68-32. ~, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF ~ PULL OR ALTER CASING BUBSEQUENT R2PORT OF: REPAIRING WELL WATER SIIUT-OFF' ' FRACTURE TREAT J--I MULTIPLE COMPI,ETE FRACTURE TREATMENT ALTERING CASING SHOOT OR ACIDIZE ~ ABANDON~ SHOOTING OR ACIDIZINO ABANDONMENT* REPAIR WELL CHANOg PLANS -- (Other) , ~Other) (No~: Report results of multiple eom~letion on Well Completion or Reeompletion Report and Log form.) O~:Sc~[Bg Pm~POSED OR CO~fPLg~gD OPERATION8 (Clearly stat. all p~rtinent details, and gtv~ pertinent dates, lncludin$ estimated date of starting any proposed work, ~o~kove~ plans have been revised for ~he ~ubjeck well subsequen~ ~o approval of ou~ ~n~al pl~ on Form 10-403 da~ed ~ay 21, 1973. ~e now propose ~o perform ~he follow- ,nE s~eps ~o ~mp~ove khe wa~er ~njec~o~ profEle of ~h~s 1. Pull tubing, drill out permanent packers at 9549' and 9570' and clean out to 10,050'. 2. Run a retrievable packer to set at 9840', resume water.injections and run radioactive tracer profile survey across perforated intervals 9870-9900' and 9920-10,000'. If tracer survey indicates an excessive volume of water is being injected into thief zone interval 9870- 9900', then that interval will be cement squeezed with 120 sacks Class "g" cement. 3. Clean out to 10,445' PBTD with bit. 4. Perforate following intervals at 2JSPF: 9630-9670', 9930 10,000', 10,010-10,030', 10,050-10,080' 10,090 10,110' 10 140-10,220' and 10,240-10,310' , -- ,, , · 5. Set a permanent packer at 9530', run water injection tubing i 6. Return well to ~ ~ injection service. anticipa~ th~ wc '~will begin about August 27, 1973· SIGNED !~/' Z~'~ ~'~~ 'TITLE District Production ~ · DATE u-I~73 :;:: ....... (This .pace fo~ State o~ ' " See Instructions On Reverse Side OIL [] WKLL STATE 0~,AiASKA OIL AND GAS CONSERVATION COMMIY~EE MONTHLY REPORT O'F DRILLING AND WOR'KOVER OPERATIONS GA.,~LL [] OT.~, Water Injection 2. NAME OF OP~.ATOR Amoco Production Compan7 8. ADDRESS OF P. O. Box 779~ Anchorage, Alaska 4. ~OCA~ON O~ w~U~ SUBMIT ~ DUPLICA~ 99510 Surface: Leg 2, Slot 2, SMGS Platform "D," 699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M. APl NUiV/ERICAL CODE 50-133-20104 LEASE DESIGNATION AN'D SEIRIAL NO. ADL-18746 ? IF INDIAN. ALOTTEE OR TRIBE NAME 8 L~NIT FA_riM OR LEASE NAME SMGS Unit I0 FL~J~D A-ND POOL Om WILDCAT ~outh Middle Ground Shoal I1 SEC T.. R, M. (BOTTOM HOLE Sec. 35, T8N, R13W, S.M. 1~. P~MIT NO 68-32 13. RF-~ORT TOTAL DEPTH AT END OF MONTH CHANGF,~ IN HOLE SIZE. CASING ANtD CEMENTING JOBS INCLUDING DEPTH SET ANE~ VOLLrM]~ USED, PEi~FOI~ATIONS. TESTS A_N-D HESULTS 'FISHING JOB//; JUnK Ilq HOLE AND SIDE-TI~ACKED BOLE A~D A~Y OTI-IE~ SIGNIFIC~T CI-IA_~3ES IN HOLE C~ON~ITION$ Summary.of. Operations Durin~:Uune 1973.: Workover deferred due to revisions to procedure, revised notice of intent will be submitted. JUl. g 4 lg? DIVISION OF OIL AND GAS ANCHORAGE .,~x~'-~(~ Vl-'~'lf~'~=r~ Supervisor in Charge DA" July.23' 1973 NC~ --Report on this form Is required fo~i~ch oolendor moflth~ regQrdless of the utotue of operations, end mutt I)e filed In dupli~ate with the oil Grid gas ~oneervatbn Qommittee b~ the 15th of the suuQeedlng month, unless otherwise directed. June 14, 1973 File: WMJ-329-~ P. O. Box 779 Anchorage ,- Alaska Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine D~ive Anchorage, Alaska 99504 Dear Sir: Re: Monthly Report of Drilling and Workover Operations MGS 17595 Well No. 4 MGS 17595 Well No. 6 SMGS Unit Well No. 11 Attached are State of Alaska Forms P-4 reporting workover operations on the subject wells for the month of May 1973. Yours very truly, W. M. Jones District Production Superintendent At tachments ¢ ~ ~" ~'-~ STATE oF ALASKA ~ ~- 1-70 OIL AND GAS CONSERVATION CONU~II-rEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS ox,. I~ o,, [~ oTa=, Water Injection WKLL ~VI~LL SUBMIT IN DIJPLICAT~ NAME OF OPEi~ATOR Amoco Production Company A~DRESS OF OPERATOR P. O. Box 779, Anchorage, Alaska LOCATION OF WELL Surface: 99510 Leg 2, Slot 2, SMGS Platform "D, 699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M. API N~IEPACAJ~ ~ODE 50-133-20104 LEASE DF~iGNAT'ION AND SE1RIAL NO ADL-18746 IF INDIA)~ ALOTiEE O)~ TRIBE 8 L-~IT F.a.I~f OR LEASE NAME SMGS Unit g w~ NO 11 10 FLEI~ A_X~D I:NZK)L OR WILDCAT South M/ddl~ Ground Shoal I1 SEC T, R, M (BO'FTOM HOLE Sec. 35~ T8N~ R13W~ S.M. 1~ PEP, JVIIT N'O ,, 68-32 "13R'EPORT TOTAL DEPTH AT END OF MONTH CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEP~H SET AND VOLI/MES USED PERFORATIONS TESTS AND RESULTS FISHING JOBS JIINK IN HOLE AND SIDE-TRACKED HOLE A.N'D ANY OTHER SIGNIFICANT CHANGES IN HOL,~ CONDITIONS Summary of Operations During May 1973: Workover deferred; plans are being revised. Appropriate notice of intent will be submitted as soon as workover revisions are finalized. JUN ! 5 19/3 DIViSi-~, r ,..h. AND GAS ANCHORAGE ~ i , 14 I hereby certify that the forego/~] m true and correct S,G~ "~D~ ~77, ~~ =TLE District Prod. Supt. DA~ June 14, 1973 , ,, - ~ - ~.~ ...... May 18, 1973 File: WMJ-272-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Re: Sundry Notice of Intent Perforating SMGS Unit Well No. 11 Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 Attached for your approval is a State of Alaska Form 10-403 reporting our intent to clean out and perforate selected intervals in the subject well to improve the water injection profile. We expect to begin about May 23, 1973. Yours v~ly, District P~oduc~'ion Superintendent At t achmen t s MAY 21. I9;'3 1'4 t- C, li. AIqD OAS ANCHORAGE Form I0 -403 R~V ! - Io-?~ STATE OF ALA$KA OIL AND GAS CONSERVATION COMMII'I'EE ~brnit "Intentions" in Trtpltmte~ ~ 'Su~quent ~" ~ Duph~ 5 APl N~C~ CODE 50-133-20104 '8 ~E D~GNA~ON ~D S~ NO SUNDRY NOTICES AND REPORTS ON WELLS (Do not use thru form for proposals to dzdl or to deepen Use APPLICATION FOR ~EI~I]~---'" for such pro~o~ls ) 1 o,,.~ELL ~.~ OAS~ELL [] OTHEa Water Injection 2 NAME OF OPE/~TOR Amoco Production Compan7 3 ADDRESS OF OPERATOR P. 0. Box 779, Anchorage, Alaska 4 nOCAT~ON OF W~-'-n ^tsurf~¢e Leg 2, Slot 2, SMGS Platform "D," 699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M. 99510 Check Appropriate Box To Indicate Nature of I~otice, Rel 13 ELEVATIONS (Show whether DF, RT. GR, etc RKB 100' above MSL 14 ADL-18746 '/ IF IN'DIA_N, ALI.,O-l-r~:~- OR TI~IBE NA/VL~ 8 UNIT, FARM OR LEASE NAME SMGS Unit 9. WELL NO 11 10 FlmLm, ~tD POOL, OR WILDCAT South Middle Ground Shoal 11 SEC , T , R , M , (BOTTOM HOL~ OBJECTIVE) Sec. 35, T8N, R13W, S.M. 12 Pl!IN.lv~ NO 68-32 )oct, or Other NOTICB OF INTENTION TO: TEST WATI~R SHUT-OFF FRACTL RE TREAT SHOOT OR ACIDIZE REPAIR ~ ELL PULL OR ALTER CASINO MULTIPLE COMPI,ETE ABANDONs CHANGE PLANS FRACTURE TREATMENT --[ ALTERING CASING SHOOTING OR ACIDIZING ABANDONMEN'Te (Other) (NOTE Report results of multiple completion on Well ~Other) Completion or Recompletion Report and Log form.) IS D~SCRIBE PROPOSED OR COMPLETF-D oPZaATIOWS (Clearly state all pertinent details, and gi~ pertinent dates, including estimated date of starting proposed work, We propose to perform the following work to improve the water injection profile of this well: . Pull tubing, drill out permanent packers at 9549' and 9570' and clean out to 10,445'. . Perforate following intervals at 2JSPF: 9630-9670' 9920-10,000' 10,010-10,030' 10,050-10,080' 10 090-10 110' 10 140-10 220' and 10,240-10,310 '. Be . We anticipate this work will begin about May 23, 1973. APPROVED BY wil~ w - m ~ TI~ Set a permanent packer at 9530', run water injection tubing and sting into packer. Return well to water injection service. I iAY 'fl ! ig'/3 TITLE District Production Supt. i~ ,_ i- CtL ~:,I',,~D GAS ANCHORAGE See Instructions On Reverse Side APproved C~y Returned l~rm N'o P--4 ~ ~- 1-70 STATE ~r ALASKA OIL AND GAS CONSERVATION CONV~I~EE SUBMrT IN DIYPLICATE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS AP1 NL~.IEHICAL CODE 50-133--20104 LEASE DESIGNATION AND SERIAL NO ADL-18746 1 ~ IF INDIA]~ ALOT'FEE OR TRIBE NAME OXL [] o,,. ['--] or-ri Water Injection WELL W~LL 8 L.~IT F.~{ OR LEASE NAME SHGS Unit NAME OF OPERATOR A~oco Production Company ADDRESS OF OPERATOR P. O. Box 779, Anchorage, Alaska 99.510 4 LOCATION OF WELL Surface: Leg 2, Slot 2, SMGS Platform "D, 699' FSL, 1872' l~L, Sec. 35, T8N, R13W, S.M. 9 WELL NO 11 10 FiF-i~D ~ND POOL OR WILDCAT South Middle Ground Shoal 11 SEC T, R, M (BO~'TOM HOI~E ommcTnr~ Sec. 35, TSN, R13W, S.M. 12 PE~V[IT NO 68-32 13 REPORT TOTAL DEPTH AT END OF MONTH CHANGES IN HOLE SIZE. CASING AND C~VIF~NTING JOBS INCLUDING DEPTH SET AND VOLU1VIES USED PERFORATIONS. TESTS ~ HEiULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS Story of .Opera_t_ions._ ...During A. prl..1.1972: April 1- 8, 1972 April 8- 14, 1972 PBTD 10,445'. Shut well in and prepared to pull and repair leak in tubing. Kill ~ell. Nipple up and test BOP. Pull tubing. Found collar washed out 277 Joints do~m. Rerun 3-1/2 in. tubing and hydrotest. Load annulus with inhibited water. Land tubing, nipple up and test wellhead. Resigned water injections. Final Report. 14 I hereby certify that ~n~~~olTect Supervisor in Charge May 12, 1972 SXGN~D JOHN C. -~CHIr v?_._?=__~. ~ DA~ NOTE--Report on this f~m is required for eo~ calendar ~nth% regardless of the status of operati0ns~ and must ~ filed in duplicate with the oil and gas conservatbn eommiffee b~the 15~ of the suec~4mg mn~,~le~ otherwme d~rected. ( ( A RICA PETnOLEUM CORPORATION P. O. Box 779 A~uchorage, Alaska 99501 December 23, 1969 HLB __ , - TRM .... - KtV HW'( REL _ File: FKK- 8ZZ-WF FIL~ _ - Re: Commencement of Water Injections - South Middle Ground Shoal Unit Well No, 11 Mr, Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State o£ Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Transmitted herewith is a sundry notice of water injection commencement at SMGS Unit Well No. 11, Injections began on December 21, 1969. Yours very truly, F. ~. ~z'ebill Area Superintendent Attachment DIVISION OF OIL AND. GAS Submit "Intentlons" in Triplicate & "Subsequent Reports" LU Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to dltll or to deepen or plug back to a dif£1erent reservoir Use "APPLICATION FOR PEr{A~IT--" for such proposals ) API NU/VIERICAL CODE 50-133-2.0104 LEASE DESIGNATION A_ND SERIAL NO -~ AJDL- 18746 2 NAME OF OPEP~ATOR Pan American Petroleum Corporation ADDRESS OF OPI~RATOR P. O. Box 779, Anchorage, Alaska 99501 LOC*T~O~ OF W~L At surface Leg Z, Slot Z SMGS Platform "D" 699' FSL, 1872' FWL, Section 35, T8N, R13W, S.M. 13 ELEVATIONS (Show whether DF, RT, GR, etc RKB 100' above MSL Check Appropriate Box To Indicate Nature of N~oti'ce, Re 8 UNIT, FAR~ OR LEASE NAME South Middle Ground Shoal Unit WELL NO 11 10 FIELD A~FD POOL, OR WILDCAT South Middle Ground Shoal 11 SEC , T , R , M , (BqYI'rOM HOLE OBJECTIVE) Sec. 35, T8N, R13W, S.M. 12 PERM. IT 1~O 68-32 :~rt, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF ~ PULL OR ALTER CASING SUBSEQUENT REPORT OF: FRACTURE TREAT [__[ MULTIPLE COMPI,ETE FRACTURE TREATMENT ALTERING CASING SHOOT OR ACIDIZE ~__~ ABANDONs SHOOTING OR ACIDIZING [_.__J ABANDONMENTS { I REPAIR WELL CHANOE PLA~S (Other) CommenceInjections ~- (Other) (NOTE. Report results of multiple completion on'Well Completion or Recompletlon Report and Log form.) 15 DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an~ proposed work. Water injections commenced on December 21, 1969. The initial injection rate was 1640 BWPD at 2000 psig wellhead pressure. DJYJSION OF OIL ANQ O~ 16 I hereby certify that the foregoin~ is true and correct TITLE Area Superintendent DATE Dec. 23, 1969 (This apace for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See l~nstructions On Reverse Side Approved Copy Returned Form No P--4 s. sv ~-~0-s: STATE O~ ALASI~ O~L AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS SUBMIT IN DEPLICA~E i OIL ~ GAS ~-~ OTHER W~;LL -- wELL 2 NA2d~ OF 01~ERAToR Pan American Petroleum Corporation ~ AD~3RESS OF OPhiR P. 0. Box 779 '4 ~A~ON ~ Leg 2, Slot 2, SMGS Platform "D"; 699' FSL, 1872' FWL, Section 35, T8N, R13W, S.M. 50-133- 20104 KLV ---- L~SE D~iGNAiION AXD S~ ~ ~ ~ REt : ? IF INDI ~,N, ALOTTEE OR FILE 8 Lr~*IT,F.a-B-M OR LEASE NA_%IE SMGS Unit 9 WELJ~ NO I1 10' FL~ML.D A-ND POOL OR WILDCAT South Middle Ground Shoal 11 SEC, T, R, M (BO~I~I'OM HOLE OBJECTIVE~ Sec. 35, T8N, R13W, S.M. 12 PEB2VIIT N'O 68-32 "'13 RE~ORT TOTAL DEPT~-I AT END OF MONTH, CHANG~ IN HOLE SI~E, CASING A2qD CEMENTING JOBS INCLUDING DEPTH ~ET AND VOLUMES USED, PERFORATIONS, TESTS AND HESULTS, FISHING JOB//;, JUNK IN HOLE AND SIDE-TRACKED HOLE AaxlD ANY OTHER SIGNIFICANT C'HA. NGES IN HOL~ CONDITIONS 9-29-69 - 10-1-69 PBTD 10445. Pulled tandem Kobe pump and standing valve. Ran 48-hour BHP survey. 10-2-69 - 10-6-69 Killed well. Nippled up BOP and tested. Pulled dual tubing; ran single string of 2-3/8" tubing and reverse circulated at 10,439. Pulled tubing and ran injection BHA. Loaded annulus with inhibited fresh water. Nippled up wellhead and tested. Hooked up filtered injection water to tubing, pressured to 2,000 PSI and pumped at 2 BPM. No pressure or flow on annulus. Pumped 175 BW. Nippled down and installed tree. Waiting on injection water. SZGN~D r~TLE Asst. Area Admin. Supvr. DA'~ November 6~ 1969, NOTE~'Report on this form ~s reqmred for each calendar month, regardless of the status of operat,ons, and must be filed ~n duphcate w~th the Dwmmn of M~nes & M~nerals by the 15th of the succeeding menth, unless otherwise d~rected Form P--S REV 9-3047 Subrmt "Intentions" in Triplicate & "Subsequent Reports" m Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMrrI'EE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use th~s form for proposals to drill or to deepen or plug back to a dffflerent reservoir Use "APPLICATION FOR P~IT--" for such proposals ) OIL ~. GAB [-'-] WELL WmLL OTHER 2 NAME OF OPEKATOR Pan American Petroleum Corporation 3 ADDRESS OF OPERATOR P. 0. Box 779, Anchorage, Alaslm 99501 4 LOCATION OF WELL Ars.race Leg 2, Slot 2, SMGS Platform "D", 699' FSL, 1872' FWL, Sec. 35, TSN, R13W, S.M. 5 AP1 BT~CAL CODE 50-133- 20104 K£V ..... 6 LEASE DESIGNATION AND SER~kL . . ~ 18746 REL ? IF INDIA-~T, ,A. LL~O'I".I,'~:~: OR TftIBE NA_M]E 8 UNIT. FARi~ OR LEASE NAME South Middle Cround Shoal 9. VFELL NO 11 10 F~T,n A/ND POOL, OR WILDCAT South Middle Ground Shoal 11 SEC , T , R , M., (BOTT~)M O~VE) Sec. 35, TSN, R13W, S.M. 13 ELEVATIONS (Show whether DF, RT, GR, etc 12 PEB/VIIT i~O RKB 100' above MSL 68-32 Check Appropriate Box To I,ndi'cate Natrure of NOtice, Re ~ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF t I PULL OR ALTER CASING FRACTLRE TREAT j j MULTIPLE COMPI,ETE SHOOT OR ACIDIZE ~ ABANDONs REPAIR WELL CHANGE PLANS (Other) Convert to injection well SUBEEQUENT REPORT OF: FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT~ (Other)  NoTE: Report results of multiple completion on Well ompletion or Recompletion Report and Log form ) 15 DESCRIBE PROPOSED OR CO~fFLETED OPERATION'S (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an~ proposed work. We plan to convert this producing well to water injection as per our application of April 16, 1969, File: AMR-967-986.511 and state approval of April 23, 1969. JIJLI?I 16SIGNEDI hereby certify that~,~ · ~ : (~,the fore;oin~, ~ correct TITLE (Thi..paeeforStateKffie~W]use)/ .~ J ~ APPROVED By/~,- ._~//~~~I~ITLE CONDITIONS OF APPROVAL, IF ANY: Area Admin. Supervisor DATE DATE See Instructions On Reverse Side Ai~P, roved Cop~ i~eturned 7/16/69 ', . Form P--7 r SUBMIT IN DUPLIC STATE OF ALASKA ~Se~ other st ructions on OIL AND GAS CONSERVATION COMMITTEE ~,,~,,~ WELL cOMPLETION OR RECOMPLETION REPORT AND LOG.* la TYPE OF WELL: O~L ['~ ',%ELL__ WELL [] DaY ['~ Other b. TYPE OF COMPLETION: ,~Ew t~ w°n~E3 DEE~'r--I ~L~I--1 ""' I--1 ~ ELL OVER EN BACK RESVR Other 2 NAME OF OPERATOR Pan American Petrole,,m Corooration 3 ADDEESS o~ oPz~s~'Oz P. 0. Box 779 - AnchoraKe~ Alaska 99501 ~-.LOCATION OF WELL (Report location cD. ri# and in accordance with any State requ:rements)* At surface Le~ 2. Slot 2. SMGS Platform D; 699' FSL, 1872 FWL, Sec. 35 At Top p~od. interval ~eported below T8N, R13W S.M. 2z~(~olf,'l ~]~, 2570' FWL, Sec. 35, T8N, R13W, S.M. ' 2578' FSL, 2466' FWL, Sec. 35, T8N, R13W, S. M. ORIGIN 5. API NUMERICAL CODE 50-133-20104 s Z~^SE D~d~k~oN AXO SEmiS NO ADL- 18746 9. IF INDIA.H, A.LJ-~TTEE OR TI~IBE NA.M~ S. U~Wr,FAP. M OR LEASE NAME South Middle Ground Shoal ~.L NO 11 I0. i~-i~:,.n A}]I) I~)OL, OR WILDCAT South Middle Ground Shoal 11. SEC., T , R . M . (Bo~rOM HOLE OBJI~-'rlVE) ~ Sec. 35, T8N, R13W, S.M. 12 PlieR.MIT 1~0. 13 DATE SP%IDDED 4-17-68 I-~W 1VIA~Y* ROTARY TOOLS 10508 H.D. 10~445 M. D. 0 - TD 22 PRODUCING I_h'r~!atVAL(S), OF ~ ~P~TIO~--~, ~M, N~E (~ AND ~)* ?32 7-10-68 8-26-68 RKB 100' above MSL J 59.4' MSL 9630 - 10~310' (md): Lower Kenai Conglomerate TYPE ELEc'rii/C AND O'rn~t LOGS RUN IES GR Sonic Dipmeter, Density~ Collar Locater -- CASING RECORD (Report all ~trings set in well) *,'20" /85 a '94 BAH-40 I 605 '; . ,,~, ~.~-_~/8". l, .~.5 Ij-55 i 2oo1' ';?~ 9-5/8", [40 &,43.5, [S-95&J 9676',. ~ I~-8° i ~,, 26 LINER INTERVALS DRILLED BY CABLE TOOLS 23 "WAS DIRECTIONAL SURVEY 1W_AD E i yes 7"[[ 94,59' 10,}02'[ 210 I 28 PEP,~OP,~TIONS OPF_~ TO PRODUc;fIOI~T (Interval, szze and number) ~9630-70, }J738-43, '9755-9805, 9870-9900, 9920 10,000, 10,010-30, 10,050-80, 10,090-110, 10,140-220, 10,240-310, all with 4 jspf HOLE S~E CEIiL~NG RECOl%D A1VIOUNT PULLED 26" 1~0 sacks 17~" [ 1600 sa~k~ J 1150 sacks i 30 PRODUCTION 27 TUBING I~I~COI%D S~ (MD) SIZE I DEPTH SET (M.D) PACKER SET (MD) 3~ 9554 ' 9540 ' 2~ ACID, SI-lOT, r~CI'~l~. CE~IgT S~U~, ~C , DMI ~V~ (~) ~ &~O~7 a ~I~ OF ~~ U~ 2210~2612~ . 300 sacks squeeze 2210-~12i~' 220 sacks resqueeze 2210-2612~. 250 sacks resqueeze lype o£ purnp/ WELL DATE FIRST Pr~oDucTION I PRODUCTION ME'ii{OD (Flowmg, gas hit, pumpmg~s~.ze and [ - ' STATUS (Produchng or [ ~nut-m) 8-8-68 J P-mnin~- Kobe TYpe "B". 3 x 2-.t.~8 x 1-7/8 x 1~7/8 Producing DATE OF TEST. !iKOnS T~ [J~OXE~IZE I~STJ~OD'~p~OD~OR , OI~BBL "I G~CF WA~B~ IJ G~-O~ ~O __8-25-68, [ 24 !124/64 ] ~ J 1573 1414 J 9 1275 FLOW.~ ~BING ll~m~ ~s~ I~-aoualC~"'~ 'OI~BBL} ' o.~ W.~B~. J om o~v~-~ '(c~.) J TEST WITNESSED BY ",Used for fuel and flared ~2. List OF ATTACHMENTS ~' 1ES Log, Directional Data (2), Core Data, Well History "' 33 I hereb~ c~rt'lfy that the foregoing aC~,tached information is complete and correct as, determined from all-available records - SI~NmD --' /%~/~ ~.~ TIT~.mAsst. Area Ad'tin. Supervisor V~T~, October 17 1968 _ ' c.K. m:a~,, ~ -~, "' i ' *(See Instructions and Spaces ~or Additional Data on Reverse Side) INSTRUCTIONS General Th~s form is designed for submitting a complete and correct well completion report end log on all types of lands and leases ~n Alaska , Item: 16: Indicate which elevahon ~s used as reference (where not otherwise shown) for depth r{'~easure- ments given ~n other spaces on th~s form and ~n any att0chments Items 20, and 22:: If th~s well ~s completed for separatc production from mor~e than one ~nterval zone (multiple complehon), so state ,n ~tem 20, and ~n ~tem 22 show the prcJuc~ng ~nterval, or ~ntervals, top(s), bottom(s) and name (s) (,f any) for only the ~nterval reported tn ~tem 30 Submit a separate report (page] on th~s form, adequately ~denhf~ed, for each ad&tlonal tnte~val to be seperately produced, show- ~ng the ackt~t~ona) data pertinent to such ~nterval Item26: "Sacks Cement". Attached supplemental records for th~s well should show the details of any mul- tiple 'stage cement~n0 and the location of the cemenhng ~o61 Item 28: Submit a separate completion report on this form for each interval to be separately produced (See Instrucl~or~ for dems 20 and 22 above) A.I'~Y ~p i,"OR.M'ATION .l'F...~'l.h INCLUI)IN(, IN1 EI[VA~ 'r~D lq~UR~ DATA ~ ~OV~ ~Y OIL, GAS, " WAT~ AND MUD NA~ ~CJ S~and ~n~t 5073~ 4860 Lower Kena~ Con- glomerate 9598 DATA. A~ACI[ BRIE~ D~CRIPI~ONS OF LITHOLOGY POROSITY, FRAC~RB APP~NT DIPS AND DETECTEI) StlOWS OF OIL, G~ OR WA~ See at~achmenc~ ~'Core Data~' CORE DA'IA Core #1 Core #2 Core #3 Core #4 Core #5 Core #6 Core #7 Core #8 Core #9 Core # 10 Core #11 9739-58' Sandstone, conglomerate, fair porosity, oil bearing. 9758-83' Conglomerate and sandstone, mica, poor-fair porosity, oil bearing ~ 9850-90' Conglomerate and sandstone, mica, few fractures, fair porosity, oil bearing. 9890-9902' Conglomerate and sandstone, poor porosity, poor oil show. 9902-21' Conglomerate and sandstone, fair porosity, oil bearing. 9921-48' Conglomerate and sandstone, mica, poor-fair porosity, oil bearing. 9948-76' Conglomerate and sandstone, mica, poor-fair porosity, oil bearing. 9976-96' Conglomerate and sandstone, poor-fair porosity, oil bearing. 9996-10,002' Conglomerate, argill., poor porosity, spotty oil stain. 10,002-42' Sandstone and some conglomerate, mica., poor porosity, poor oil show. 10,042-54' Conglomerate, argill., poor porosity, oil bearing. Core #12 Core #13 Core #14 Core #15 Core #16 Core #17 Core #18 Core #19 Core #20 Core #21 Core #22 10,054-58' Conglomerate, argill., mica, t±te-poor porosity, poor oil show. 10,058-87' Sandstone and conglomerate with thin bed siltstone, tite-poor porosity, poor oil show. 10,087-97' Siltstone, carb., with thin bed conglomerate, tite, no show. 10,097-126' Sandstone, mica., silty, poor-fair porosity, oil bearing. 10,126-38' Sandstone and conglomerate, fair porosity, oil bearing. 10,141-167' Conglomerate and sandstone, fair-good porosity, oil bearing. 10,167-97' Sandstone and conglomerate, fair porosity, oil bearing. 10,197-216' Sandstone and conglomerate, mica., argill., poor porosity, poor oil show. 10,216-234' Conglomerate, argill., poor porosity., very poor oil show 10,234-257' Sandstone and conglomerate, poor-fair porosity, very poor oil show. 10,257-279' Conglomerate and sandstone, tite-poor porosity, very poor oi 1 show. CHRONOLOGICAL WELL HISTORY SMGS Unit Well #11 6/22 - 7/13 7/14 - 7/20 7/21 - 7/30 7131 - 811 812 8/3- 6 817 - 13 8/14- 19 8~20 8/21 8/22- 23 8/24- 25 8~26 Spudded Drilled 17½" hole to 630', opened to 26", and set 20" casing at 605' with 1250 sacks. Drilled 12~" hole 630-2030', opened to 17~", and set 13-3/8" casing at 2001' with 1600 sacks Temporarily Suspended Drilled 12~" hole 2030-9684', logged, and set 9-5/8" casing at 9676' with 1150 sacks. Drilled and cored 9684-10,508', logged and set 7" liner 9459-10,502' with 210 sacks. Cleaned out to 10,445'. Ran-t~ng and packer and perforated 10,140'-220' and 10,240-310' Installed surface Kobe equipment. Rolled casing and set BP at 2412' with 13 sackssand above. Set ~ packer at 2210' and cemented with 300 sacks cement. Squeezed last 10 bbls at 600 psi. Instant SIP 400 psi; 15 minute SIP 50 psi. WOC 18 hours and drilled firm cement 2244-2362'. 500 psi squeeze broke down cement. Set packer at 2210' and squeezed 220 sacks with final squeeze pressure of 5000 psi. WOC 24 hours, drilled firm cement 2268-2395'. 700 psi test pumped in. Reset packer at 2210' and squeezed 250 sacks. WOC 24 hours, drilled cement 2214-2330' and tested to 1500 psi. Drilled cement 2330-2395' and tested 800 psi for 30 minutes. Recovered BP and cleaned out to 10,445'. Landed dual tubing and perforating gun stopped at 9408' at Kobe cavity. Pulled and reran tubing and swabbed. Temporarily 'suspended for rig to work on another well. Landed tubing at 9572' in packer, perforated intervals between 9860' and 10,110' and ran BHP test. Perforated intervals between 9630' and 9960'. Circulated and shifted packer to 9540'. Ran Kobe pump and released rig. Pump t~sted. Completed as a pumping oil well. PAN AMERICAN PETROLEUM CORPORATION SOUTH MIDDLE GROUND SHOAL 1874~ UNIT SOUTH ~IDDLE GROUND SHOAL ALASKA 11 VERTICAL JULY 17 1968 SECTION,COMPUTED PAGE SURVEY DATE ALONG CLOSURE ; 4 SPERRY-SUN WELL RECORD SURVEYING COMPANY OF SURVEY SU-3-16328 MEASURED DEPTH ~,50. 2000. 2100. 2200. 2300. 2400. 2500. 2600. 2700. 2800. 2900. 3000. 00. 3200. 3300. TRUE VERTICAL DEPTH 1926.06 1974.12 2068.53 INCLINATION DIRECTION DEG MIN DEG SU-3-16275 16 O. N 80 E 19 15 N 82 E DOG-LEG SEVERITY DEG/IO0 O.CO 3.30 2161.73 21 15 N 79 E 2.25 2255.55 20 15 N 72 E 2.67 2350.92 17 30 N 55 E 6.12 2447.16 15 45 N 49 E 2.44 2544.50 13 15 N 47 E 2.54 2641.84 13 I5 N 46 E 0.22 N 43 E N 3i E N 20 E 19 19 22 2739.18 2835.99 2933.02 3029.61 3124.72 3218.08 13 15 14 30 14 0 15 0 18 0 21 0 0.68 3.13 2.74 1.03 2.99 3.16 VERTICAL SECTION 166.43 180.67 i98.01 218.15 242.04 265.20 285.i7 305.33 326.03 350.39 374.56 400.43 431.32 467.05 REC NORTH 89.96 92.35 96.94 103.85 114.55 131.80 149.60 165.24 181.16 197.92 242.11 266.59 295.80 329.03 TANGULAR SOUTH CCORDINATES EAST WEST 245.91 259.48 292.13 327 360 385 4O5 422 438 454 467 475 .7O .62 .25 .74 .50 .99 .b2 .52 .79 484.22 494.28 507.70 3400. 3500. 3600. 3700. 3800. 3900. 3310 3402 3493 3585 3676 3768 .13 .71 .25 .78 .31 23 23 23 23 23 23 0 15 30 45 45 45 N 22 E N 23 E N 23 E N 22 E N 22 E N 2i E 2.00 0.46 0.24 0.47 0.00 0.40 506.01 545.31 585.01 62b.16 665.32 705.52 365 401 438 475 512 550 .26 .60 .30 .64 .99 .58 522 537 553 568 583 597 .34 .76 .34 .43 .52 ..95 4000. 4100. 4200. 3859 3951 4043 .84 .37 .08 23 45 23 45 23 30 N 21. N 22 N 21 0.00 0.40 0.47 745.72 785.88 825.68 588 625 662 .18 .53 .75 612.38 627.47 641.76 P~N AMERICAN SOUTH MIDDLE SOUTH MIDDLE ALASKA PETROLEUM CORPORATION GROUND SHOAL 18742 UNIT GROUND SHOAL 11 SPERRY-SUN WELL RECORD MEASURED DEPTH 300. 4400, 4500. TRUE VERTICAL DEPTH 4134.96 4227,18 4319.73 INCLINATION DEG MIN 23 15 22 45 22 15 DIRECTION DEG N 21 E N 20 E N 19 E 4600. 4700. 4800. 4412 4505 4598 .28 .64 .84 22 21 21 15 0 15 N 19 E N 17 E N 18 E 4900. 5000. 5100. 4693 4787 4882 .11 .80 .21 19 18 19 30 45 15 N 16 E N 16 E N 17 E 5200. 5300. 5400. 4977 5073 5168 .84 .21 .84 17 17 17 0 3O 0 N 14 N 15 N 13 "--'500. 9600. 5700. 5264.47 5360.72 5457.31 17 15 15 0 45 0 N 12 E N 10 E N 9E 5800. 5900. 6000. 5554 5651 5748 .34 .37 .50 14 14 13 0 0 45 7 E 7 E 7 E 6100. 6200. 6300. 5845 5942 6039 .53 .67 .80 14 13 13 0 45 45 5 E 5 E 4 E 6400. 6500. 6600, 6136 6233 6329 .72 .32 .44 14 15 16 15 0 0 5 E 3 E 1 E VERTICAL JULY 17 1968 SECTION COMPUTED PAGE 2 SURVEY DATE ALONG CLOSURE DO SE D SURVEYING COMPANY OF SURVEY G-LEG VERITY EG/iO0 VERTICAL SECTION 0.24 0.63 0.62 865.09 903.72 941.58 SU-3-16328 RECTANGULAR COORDINATES,, NCRTH SOUTH EAST WEST 699.61 655.91 735.94 669.13 771.75 tx/ 681.46 0.00 979.43 807.55 693.79 1.45 1015.26 841.82 704.27 0.43 1051.51 876.29 715.47 1.88 0.74 0.59 1084.88 1117.01 1149.97 2.43 0.58 0.77 1179.15 1209.19 1238,34 0.29 1.37 0.79 1267.44 1294.34 1319.93 1.11 0.00 0.24 1343.71 1367.50 1390.86 0.54 0.24 0.23 1414.47 1437.67 1460.77 0,55 0.90 1.13 1484.79 1509.84 1536.26 908.38 939.28 970.80 999.17 1028.22 1056.71 724.67 733.53 743.17 750.24 758.02 764.60 1085.30 1112.04 1137.60 770.68 775.39 779.44 1161.61 1185.62 1209.21 782.39 785.34 788.23 1233.31 1256.99 1280.70 790.34 792.41 794.07 1305.22 1331.07 1358.63 796.22 797.57 798.05 P~N AMERICAN SOUTH MIDDLE SOUTH MIDDLE ALASKA PETROLEUM CORPORATION GROUND SHOAL 18742 UNIT GROUND SHOAL 11 VERTICAL SPERRY-SUN WELL SURVEYING CCFPANY RECORD OF SURVEY ~EASURED DEPTH ~700. 6800. 6900. TRUE YERTICA DEPTH 6425.07 6521.20 6617.44 INCLINATION DEG MIN 17 0 16 .0 15 45 DIRECTION DEG N 1 W N 2 W N 6 W DOG-LEG SEVERITY DEG/iO0 1.14 1.03 1.12 VERTICAL SECTION 1563.97 1589.94 1614.82 7000 7100 7200 6713 6809 6905 .69 .82 .06 15 45 16 0 17 45 8 W 8 W 9 W 0.54 0.25 1.77 1639. 1664. 1691. 30 16 42 7300 7400 7500 7001.53 7099.44 7197.76 15 11 10 15 45 30 N 5 W N 6 W N 10 W 2.74 3.50 1.46 i715. 1734. I750. 7I 37 52 7600 7700 7800 ""7900 8000 8100 . 7296.53 . 7395.30 · 7494.00 . 7592.25 · 7690.15 · 7788.31 10 11 11 0 0 15 45 45 0 N 13 W N 16 W N 7W N 3 E N 9 E N 9 E 1.58 0.46' 1.44 2.28 1.53 0.75 I763. 1777. i79I. 1809. 1829. 1848. 99 02 64 69 83 69 8200 8300 8400 7886 7985 8085 .80 .76 .07 10 0 8 15 6 45 9 E 3 E 2 W 1.00 1.98 1.63 1865. 1879. 1890. 86 75 82 850O 86O0 8700 8184.56 8284.22 8383.88 5 45 4 45 4 45 N 12 W N 20 W N 32 W 1.47 1.23 0.99 1899. 1906. 1911. 54 10 47 8800 8900 9000 8483.60 8583.33 8683.02 4 15 4 15 4 30 N 37 W N 48 W N 58 W 0.63 0.81 0.80 1915. 1918. 1920. 76 82 78 JULY 17 196B SECTION COMPUTED PAGE 3 SURVEY DATE ALONG CLOSURE SU-3-16328 RECTANGULAR NORTH SOUTH 1387.86 1415.41 1442.41 1469.29 1496.58 1526.69 1552.90 1573.15 1591.09 1606.34 1621.37 1637.33 1655.96 1676.07 1694.92 1712.07 1726.40 1738.14 1747.94 1755.72 1762.75 1768.66 1773.62 1777.78 CCORDINATES EAST WEST 797.54 796.58 793.74 789.97 786.13 781 · 36 779.07 776.94 773.77 770.26 765.94 163.98 764.96 768.15 771.13 773.85 774.60 774.19 772.11 769.27 764.89 760.43 754.92 748.26 Z 0 PAN AMERICAN PETROLEUM CORPORATION SOUTH PIDDLE GROUND SHOAL 18742 UNIT SOUTH PIDDLE GROUND SHOAL ALASKA 11 SPERRY-SUN WELL RECORD TRUE INCLINATION DIRECTION MEASURED VERTICAL DEPTH DEPTH DEG MIN DEG VERTICAL 9100. 8782.64 5 0 N 58 W 9200. 8882.36 A 15 N 60 W 9300. 8982.02 4 45 N 68 W 9400. 9C81.38 6 30 N 66 W 9500. 9180.92 5 30 N 70 W 9600. 9280.41 5 45 N 69 W S700. 9379.72 6 45 N 76 W 9800. 9479.26 5 30 N 68 W 9900. 9578.71 6 0 N 64 W lO000. 9678.07 6 30 N 66 W 10100. 9776.70 9 30 N 54 W 10200. 9874.78 11 15 N 47 W 10300. 9972.01 13 30 N 42 W 10400. 1C067.77 16 45 N 43 W **~* THE CALCULATION PRCCEDURES ARE BASED ON HORIZONTAL DISPLACEPENT = 1969.79 SURVEYING COMPANY OF SURVEY DOG-LEG SEVERITY VERTICAL DEG/IO0 SECTION 0.49 1922.95 0.76 1924.54 0.80 1925.18 JULY 17 1968 SECTION COMPUTED PAGE 4 SURVEY DATE ALONG CLOSURE SU-3-16328 RECTANGULAR COORDI NORTH SOUTH EAS 1782.40 740.8 1786.11 734.4 1789.21 ~ 726.7 1.76 1926.44 1793.81 1.08 1926.84 1797.09 0.26 1927.44 1800.68 1.25 1926.71 1803.52 1.51 1927.44 1807.11 0.64 1928.97 1811.70 0.54 1930.24 1816.30 3.41 1935.45 1R26.00 2.15 1943.82 1839.31 2.49 1955.64 3.26 1969.79 THE USE OF THE FEET AT NORTH NAIES T WEST 716.44 707.43 698.08 686 · 67 677.7e 658.05 630.43 1856.66 ' 614.8 1877.73 595.1 TANGENTIAL OR CHORD HETH 17 DEG. 35 kiN. EAST(TRUE) l'~rm No P--4 REV 9-~4~.~ , STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUBMIT IN DUPLICATg MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS r5 AP1 NLrNiEKICAL CODE 50-133-20104 6 LEASE D~iGNA~ON AND S~IAL NO ADL - 18746 1 T IF INDIA)X, ALOT IE~ OR TRIBE NAME O,L [~ GA8 F-~ OTHER WKLL WELL 2 N~E OF OP~R 8 L~IT,F.~I OR LEASE Pan American Petroleum Corporation S~GS Unit 9 xv~ NO 3 ADDR~S O~ OPEP..A. TOR P. O. Box 779 - Anchora~e~ Alaska 99501 4 LOCA~N OF WELL Leg 2, Slot 2, SMGS Platform 'D'; 699' FSL, 1872' FWL, Section 35, T8N, R13W, S.M. 11 I0 F}~:}.~ A_ND PC)OL OR WILDCAT South Middle Ground Shoal n s~c. ?. R, ~ mO~OX~ HO= Sec. 35, T8N, R13W, S.M. 12 PERMIT NO 68-32 13 REPORT TOTAL DEPTH AT END OF MONTH, CI-I3kNGES IN HOLE SIZE. CASING A_ND CE!ViENTING JOBS INCLUDING DEPTH SET AND VOLUiViES USED, PERFORATIONS. TESTS A.N/) RESULTS. FISHING JOBS. JUNK iN HOLE AND SIDE-TRACE.ED HOLE A3qT) A_NY OTI-I~R SIGNIFICA/~r CHA/NTGES iN HO~ CONDITIONS 8/26 - PBTD 10,445'. Completed as a pumping oil well. 8/i 8/2 8/3-6 8/7-13 8/14-19 s/2o 8/21 8/22-23 8/24-25 Rolled casing and set BP at 2412' with 13 sx sand above. Set packer at 2210' and cemented with 300 sx cement. Squeezed last 10 bbls at 600 psi. Instant SIP 400 psi; 15 minute SIP 50 psi. WOC 18 hours and drilled firm cement 2244-2362'. 500 psi squeeze broke down cement. Set packer at 2210' and squeezed 220 sx with final squeeze pres- sure of 5000 psi. WOC 24 hours, drilled firm cement 2268-2395'. 700 psi test pumped in. Reset packer at 2210' and squeezed 250 sx. WOC 24 hours, drilled cement 2214-2330' and tested to 1500 psi. Drilled cement 2330-2395' and tested 800 psi for 30 minutes. Recovered BP and cleaned out to 10,448'. Landed dual tubing and perforating gun stopped at 9408' at Kobe cavity. Pulled and reran tubing and swabbed. Temporarily suspended for rig to work on another well. Landed tubing at 9572' in packer, perforated intervals between 9860' and 10,110' and ran BHP test. Perforated intervals between 9630' and 9960'. Circulated and shifted packer to 9540'. Ran Kobe pump and released rig. Pump tested. ~4 i hereby certl£y that ~reg~g~ c~rrect mGN~D ~ . ~TL~ASst. Area Admin. Supvr. DA~ 9-12-68 N01E~Report on thru form eqmred for each calendar month, r e~ardle~ of the ~tatu~ o~ o~eraUon% an~ mu,t ~ flle~ m duphcat~ w,th the Dtvmon of M~nes & M~nerals by the 15th of the succeed,ng month, unless othe~,se d~rected Form No P--4 ( STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUBMIT IN DUPLICATE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 2 NAME OF OP~tA. TOR Pan American Petroleum Corporation 3 ADDRESS OF OPERATOR P. 0. Box 779 - Anchorage, Alaska 99501 4 LOCATION OF WTM Leg 2, Slot 2, SMGS Platform 'D'; 699' FSI., 1872' ~WI., Section 35, TSN, R13W, SoM. AP1 NL~IEHICAL ~ODE 50-133- 20104 LEASE DESiGN'Ai'ION AND SE-~IAL NO AD1- 18746 IF INDIA]~, ALOTTEE OR TRIBE HAME 8 L,~IT,F.M~I OR LEASE NaME SMGS Unit 9 WELL NO 11 10 FIF~ A_%ID POOL OR WILDC~kT South Middle Ground Shoal 11 SEC , T . R, M (BO'I'FOM HOLE om,rr, c--rn~ Sec. 35, T8N, R13W, S.M. 12 PERMIT NO 68-32 / 13 REPORT TOTAL DEPTH AT END OF MONTH, CH.A-N'GES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PEP,,FOH. ATIONS, TESTS A/N-D HESULTS FISHING JOBS, JUNK IN HOLE A.ND SIDE-TRACKED HOLE AND ANY O'I~IER SIGNIFICANT CH. ANGES IN HOI.~ CONDITIONS 7/31 PBTD 10,448'. Preparing to repair split in 9-5/8" casing at 2329'. 7/1-13 7/14-20 7/21-30 Drilled and cored 8-5/8" hole 10~002-1q, 508', logged and set 7" liner 9459-10,502' with 210 sx. Cleaned out to 10,448'. Ran tubing and packer and perforated 10,140-220', 10,240-310'. Installed surface Kobe equipment. 14 I hereby ce~ th~~~rrect ' S~GN~D . · ~, 'n'n.z Asst. Area Admin. Supvr. DATE 8-8-68 NOTl:--Report on this form m ~mred for each calendar month, regardless of the status of ol~erauon$, an~ must ~ f~e{I m duphcate with the Diw$1on of Mines & Minerals by the 15th of the succeeding month~ unless otherwise d~rected Form No P--4 REV 9-30-6'; STATE OF ALASKA O]L AND GAS CONSERVATION COMMII-I'EE SUB.%IIT L~q DIgPLICATE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS OIL ~ GAB ~ WELL ~ WELL ---J OTHER 2 NAME OF OP]~TOR Pan .american Petroleum Corporation 3 ADDRESS OF OPERATOR P 0 Box 779- Anchorage, Alaska 99501 4 LOCATION OF WELL Leg 2, Slot 2, SMGS Platform 'D'; 699' FSL, 1872' FWL, Section 35, T8N, R13W, S.M. AP1 NL~.IERICAL CODE 50-133- 20104 6 LEASE DESiGNAYION A\'D SERIAL ADL- 18746 IF INDi AN %LOT,-I'EE OR TRIBE NAAIE 8 L.~X'IT, F.kl~_M OR LE &SE N SMGS Unit 9 WELL NO 11 10 FI~-I.~ A_\'D POOL OR %% ILDCAT South Middle Ground Shoal 11 SEC, T, R, M t BOT'TO.'%I HOI_,E OBJEC~IV'E ~ Sec. 35, T8N, R13W, S.M. 12 P]~qlVIIT NO 68-32 13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SI~E, CASING ANT) C~VIENTING JOBS INCLUDING DEPTH SET A_N'D VOLLrMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK LNT HOLE AND SIDE-TRACKED HOLE AND AllY OTHER SIGNIFICANT CHANG~ IN HOI.~ CONDITIONS 6/30 6/1-21 6/22-30 TD 10,002' Coring. Drilled 12-1/4" hole 7171-9684' casing at 9676' with 1150 sx. Cored 9739-10,002'. , logged and set 9-5'/8" RECEIVED JUL 15 1968 DIVISION OF MINES & MINERALS ANCHORAGE 14 I hereby ee~~ ct SIGNED ~ TITLmAss't. Area Admin. Supvr. DA'I/ 7-10-68 NOTE--Report on this form ~s tared for each calendar month, regardless of the status of operat,ons, and must be filed m duphcate w~th the D~ws~on of Mines & Minerals by the 15th of the succeeding month, unless otherwIse d~rected Form No P--4 HEV 9-30-6; ( STATE OF ALASKA O]L AND GAS CONSERVATION COMMITTEE SUBMIT k~ DE~LICATE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS W~'LL ~ WZLL NA_ME OF OP~ATOR Pan American Petroleum Corporation ADDRESS OF oPm~roa P. 0. Box 779 - Anchorage, Alaska 99501 LOCATION &F WmTJT. Leg 2, Slot 2, SMGS Platform 'D'; 699' FSL, 1872' FWL, Section 35, TSN, R13W, S.M. AP1 NL-AIERICA_L CODE 50-133-20104 LE~SE DESiGNAilON' A\-D SERIAL XO ADL- 18746 IF INDi ~X %LOTTEE OR TRIBE NAME 8 L--NIT,F.a.i:L.M OR LEASE N SMGS Unit 9 WELL NO 11 10 FIEJ~D AND POOL OR WILDCAT South Middle Ground Shoal 11 SEC T R, M ~BO'I~I'O.M HOLE OBJECTrVE ~ Sec. 35, TSN, R13W, S.M. 12 PER2vlIT NO 68-32 13 REPORT TOTAL DKPTH AT END OF MONTH, CI-I.A-NGES IN HOLE SI~.E, CASING AND CEi~IENTING JOBS INCLUDING DEPTH SET AND VOLLrMt~ USED, PER~ORATIONS, TESTS AND RESULTS, FISHING JOBI$, JLrNK IN HOLE AND SIDE-TI:LACKED HOLE AND ANY OTHER SIGNIFICANT CHAIN'G-ES IN HOL~ CONDITIONS 5/31 TD 7171'. Drilling. 5/1-18 TD 2030'. Temporarily suspended. 5/19-31 Moved drilling rig on and drilled 12-1/4" hole 2030-7171' DIVISION OF ~INES ANCHORAGE · 14 I hereby SIGNED T~TLEAs s ' t .Area Admin. Supvr. mA'am: 6-11- 68 NOTE--Report on th~s form ;s r~red for each calendar month, regardless of the status of operat,ons, ancl must be fflea m duphcate wfth the D~wsmn of Mines & Mmeral~ by the 15th of the succeeding month, unless otherwise dfrected l%rm No P---4 ~ 9-30-6'; STATE OF ALASKA SUBMIT 1/~ DEPLICATE ~ APl NL~,.IEHIC.%L CODE O~L AND GAS CONSERVATION COMMITTEE 50-133-20104 MONTHLY REPORT OF DRILLING ~ L~,SE OES:G.','A~ION A',-O S~IAL ~o ~- 187~6 AND WORKOVER OPERATIONS T IF I~Di eX k~T~E O~ TRIBE 0IL ~ GAB WELL~ WELL ~ OTHER N~E OF OP~TOR 8 L~'IT,F.~M OR LEASE N.~ME Pan ~erican Petroleum Corporation S~GS Unit ADDR~S OF OPhiR 9 %VE~ NO P. 0. Box 779- Anchorage, Alaska 99501 11 ~CA~ON OF w~ 10 Fr~D ~ND ~L OR WILDCAT South Middle Ground Shoal 11 SEC, T, R M ~BOT'FOM HOLE OBJECTIVE ~ Sec. 35, T8N, R13W, S.M. 12 P]/IB2VIITNO 68-32 Leg 2, Slot 2, SMGS Platform 'D'; 699' FSL, 1872' FWL, Section 35, T8N, R13W, S.M 13 REPORT TOTAL DEPTH AT END OF MONTH, CH.A~GES IN HOLE SI~E, CASING A_N'D CEMENTING JOBS INCLUDING DEPTH SET A_N'D VOL~ USED, PERFORATIONS, TESTS A_ND RESULTS, FISHING JOBS, JUNK Id~' HOLE A_ND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CI-IANGES IN HOI..~ COI~DITIONS 4/24 4/17 4/18-19 4/20-23 4/24-29 TD 2030'. Temporarily suspended. Spudded from surface with workover rig. Drilled 12-1/4" hole to 630', opened to 26" and set 20" casing at 605' with 1250 sx. Drilled 17-1/2" hole to 2030' and set 13-3/8" casing at 2001' with 1600 sx. Moved off workover rig and temporarily suspended. 14 I hereby certify thai the forfgomgys .true ~ correct s~amm ~'/~,~~ UTn~Ass't. Area Admin. Supvr.DA.~, 5/7/68 NOTE--Report on th~s form ~s required for each calendar month, regardless of the status of operaUons, and must be fdecl m duplicate w~th the D~ws~on of Mmes & M~nerals by the 15th of the succeedmg month, unless otherwise d~rected FORM 470 2-57 o. RECEIVED Anchorage, Alaska 99501 April 18, 1968 APR ~ :~ lg$1l DIVISION OF ~N~S & File: FliK- 498-WF Re: Spud New Well - SMGS Unit No. 11 Director Division of Lands Department of Natural Resources State of Alaska 344 Sixth Avenue Anchorage, Alaska Dear Sir: This is to notify you that the subject well was spudded on State Lease ADL-18746 at 1400 hours on 4/17/68. The surface lo- cation of this well is at SE/4 SW/4, Section 35, TSN, R13W, S.M. We plan to drill this well directionally to a bottom hole location of NW/4 SE/4, Section 35, T8N, R13W, S.M. Yours very truly, F. K. ~rebill Area Superintendent April 18, 1968 l~e: Sou~b ~Lddle Crom,l Shoal ~rator ~'. O. aox779 ~or~, ~ 99501 Eue~oaed pieaae f~d tim ipprav~ app:Lteatton for to tirol! t~ referenced yell. ~bl! smpl~o and core eJLtp, ere not req~trod o Very truly youros ILar1 L. VouderAhe aer~ns ~atro~eum guperv~ ~V:my i~cl~oure FORM SA - I B 125.5M 8/67 MEMORANDUM State of Alaska TO:!-- Di'reetor FROM: DATE : SUBJECT: South ~ddle Gro~ ,,~oal il! Operator i~ ~'t~e ~mtn~ ot ~50,00 ~o~ fila. tee:. FORM SA - i B 125.5M 8/67 MEMORANDUM State of Alaska TO:I- FROM: DATE : SUBJECT: ~th ~ddle Cro~u~ ~uoal ill Pan Ame~ica~ P~Zrol.eu~ Co~ration, Form ~ 9°30-6'; SUBMIT IN TRIP(' TE (Other instructions o,~ reverse side) STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK TYPE OF WORK DRILL [k-I DEEPEN [-] PLUG BACK [--J 01L ~] OAS r~ 8INGLE {'---I M[ITIPLE ~_~ WELL WELL OTHER ZONE ZONE 2 NAME OF OPERATOR Pan American Petroleum Corporation 3 ADDREC~ O~ OPEH.~TOR P. O. Box 779 - Anchorage, Alaska 99501 4 LOCATION OF WELL At surface 699' FSL, 1872' FWL, Section 35, T8N, R13W, S.M. At proposed prod zone 2140' FSL, 2140' FEL, Section 35, T8N, R13W, S.M. API 50-133-20104 5. 6. LF~ASE DESIGNATION Ad%rD SE/~LAL NO /~L- 18746 IF INDIAN, ALLO'i-r~ OR ~ NAME 8 UNIT. FARM OR LEASE NAME SMGS Unit 9 WELL NO 11 10 FIELD AND POOL, OR WILDCAT South Middle Ground Shoal 11 SEC , T , R , M , (BOTTOM HOLE OBJECTIVE) Sec. 35, T8N, R13W, S.M. 13 DISTANCE IN MILES AND DIRECT.~ON FAOM NEAREST TOWN OR POST OFFICE* 12 15-1/2 miles NNW of Kenai, Alaska 14 BOND INFORMATION Blanket bond in force TYPE Surety and/or No 15 DISTANCE FROM PROPOSED* LOCATION TO NEAREST 3140.'. from North PROPERTY OR LEASE LINE, FT or west line oi (Also tO nearest drlg, unit, if any) A'DT. - ] RT/,~ 18 DISTANCE FROM PROPOSED LOCATION* TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT 1646' E of b~C~ Unit ~)10 21 ELEVATIONS (Show whether DF, RT, CR, etc ) RKB 100 ' above MSL 16 NO. OF ACRES IN LEASE 4160 AZ~O, mt 19 PROPOSED DEPTH 11~000' I? NO ACRES ASSIGNED TO THiS WELL 80 20 ROTARY OR CABLE TOOLS Rotary ~ APPROX DATE WORK WILL START* April 20, 1968 23 PROPOSED CASING AND CEMENTING PROGRAM i SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRAI~E S]~FTING DEPTH QUANTITY 0F CEMEN~ 26" 20" 85~) & 94~) B&H-40 600' Circulate to surface 17-1/2" 13-3/8" 54.5-~) J-55 2000' Circulate to surface ] ?- 1 /l" q- ~/R" APW~ & A3. M~ S- 95 11000 ' Minim:_,.m 500 Sx. , & N-gO 1. Deviation required to reach BHL from permanent platform. 2. There are no affected operators. 3. BOP specifications attached. 4. Intervals of interest will be perforated and may be stimulated. IN ABOVE SPACE DESCRIBE PROPOSED PROGRA2Vi If proposal is to deepen or plug back, g~ve data on present productive zone and proposed new productive zone If pro,posal ~s to drill or deepen d~rect_onally, gzve pertinent data on s~bsurface l~mtwns and measu~(t and true vertical depths G~ve blow~ut preventer program 24 I hereby c~~t y~mg ~e. and C_~orrect~/~/ ~-'~ SIGNED , ' ~)~-~ DA~ - April 15, 1968 (This space for S~te ~~ { ~ ~/ [~ CONDI~ONS OF ~PROV~, IF A~: ~_mAss't.Area Admin. Supvr. DIRECTIONAL SURVEY b~ YES PERMIT NO_ tA P I NTJMERICAL CODE APPROVAL DATE '-:"- / / // / /// .~ iii ~ ill [ 1765' SEWARD MERIDIAN I i I TSN ALASKA T 7 N i SCALE' I"= I000' 2 '"25 I LEG NO. I LEG NO 2 LEGNO ;5 LEG NO. 4 LAT 60044' 08.16" LAT 60o44' 0772" . LAT 60,° 44' 0708" LAT 60° 44' 0752" LONG 151050'4585'' LONG 151°$0'd,478'' I_ONG 151030'4586'' LONG 151° 30' 46 94" Y = ,?.,463,917 Y = 2,46:5,871 Y = 2,465)807 Y = 2,463)855 X = 229,266 X = 229,3,19 X = 229,263 X = 229,211 FROM S W COR FROM SW COR FROM S W COB FROM S W COB 745' NORTH 8' 699' NORTH ~ 653' NORTH 8, 678' NORTH 1818' EAST 1872' EAST 1818' EAST 1765' EAST CERTIFICATE OF SURVEYOR I hereby certify that ! am properly registered end I~censed to practice land surveying in the State of Alaska and that th~s plat represents a rocat~on survey made by me or under my supervision end tho! oll d~mens~ons and other details ere correcf. Dote ' Surv~'yor ~ SURVEYORS NOTE II il The Iocot~on of S.M.G S. Plotform D wos accomplished "Co by use of U.S C & G.S stations st", "East Fore,and Light",and "Boulder" and C.E.T. 18 (Offset 2) FINAL PLAT OF S.M.G.S. PLATFORM "D" LOCATED IN I/4 SW t/4, PROTRACTED SEC 35, T 8N,RISW,S M SURVEYED FOR PAN AMERICAN PETROLEUM CORP. BO. BOX 779 ANCHORAGEs ALASKA SURVEYED BY E M. LINDSEY & ASSOC. LAND SURVEYORS 8~ CIVIL ENGINEERS 3201 ARCTIC BLVO ANCHORAGE, ALAS KA S~s ~q b --+----Pipe Rams 2" Check Vaive Spool 2"Plu~.~' '~ 2" Plug or Ga~e Valve . side outlet Zquipment below this furnished by Pan A.m. p~ug v~ ive 4" line w/shop made s::,2ep x:/no lank ~-~------ " i ne ' O~I 2" plug valve ~ ~ 2" line !" choke i. All preventors ~o be hydraulically operoted from an accumulator which x,i]i open and close hydrll a~ teas~ ~hree ~imes'wi~houa recharging. 2. All equipment thru which bit must pass to have at least as large ID as casing being drglied ' ° ,' . 3. Kelly cock to be on Kelly from ~iAile Of Spud. 4. Drill pipe safety valve equivalent to Sheller' ~fod. 55 or OMSCO, ~:ith proper connections, ~o b~. on rig floor at all r_imes. 5. All equipment m2~tione~ above lifo be 5000~-~ WP or stronger. 6. All connections to be flanged. 7. Operating manifold to be in easy reach of drillers station w/l remote operating