Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout189-006Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 12/04/2025 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20251204 Well API #PTD #Log Date Log Company Log Type AOGCC E-Set# PBU 05-04A 50029201520100 196089 10/30/2025 BAKER RPM PBU F-18B 50029206360200 225099 11/4/2025 BAKER MRPM END 1-39A 50029218270100 206187 11/20/2025 READ PressTempSurvey END 1-55 50029217880000 188021 11/26/2025 READ PressTempSurvey END 1-57 50029218730000 188114 11/18/2025 READ CaliperSurvey END 1-63 50029219050000 189006 11/23/2025 READ PressTempSurvey END 1-65A 50029226270100 203212 11/29/2025 READ PressTempSurvey END 2-18 50029220320000 190043 11/19/2025 READ PressTempSurvey END 2-20 50029220480000 190060 11/24/2025 READ PressTempSurvey END 2-32 50029220840000 190119 11/30/2025 READ PressTempSurvey END 2-46B 50029219210200 197137 11/21/2025 READ PressTempSurvey NCI A-13 50883200870000 192106 11/27/2025 READ Caliper Survey NS-33A 50029233250100 208189 5/22/2025 READ EVCamera Please include current contact information if different from above. T41175 T41176 T41177 T41178 T41179 T41180 T41181 T41182 T41183 T41184 T41185 T41186 T41187 END 1-63 50029219050000 189006 11/23/2025 READ PressTempSurvey Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.12.05 11:03:29 -09'00' 1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Wellhead treatment Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 13,196 feet 12,905 feet true vertical 10,540 feet 12,739' (Fill)feet Effective Depth measured 12,905 feet 11,251' & 11,356'feet true vertical 10,356 feet 9,215' & 9,288'feet Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# / 13Cr-80 / Vam Top 11,370' 9,298' HES TNT 1,524' MD Packers and SSSV (type, measured and true vertical depth)ZXP LTP HXO SVLN See Above 1,519' TVD 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: Same 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title:Operations Manager Contact Phone: NA Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG 3621 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Ryan Thompson ryan.thompson@hilcorp.com 907-564-5005 N/A measured true vertical Packer MD 2,500' Size 2,490' 8,398' Length Liner 1,647' 1,593' 9-5/8" 1,769' Intermediate Intermediate Liner 10,021'4,760psi NA NA Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) NA Gas-Mcf 1800 NA 1800NA 93 3026130 307 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 189-006 50-029-21905-00-00 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 3. Address: Hilcorp Alaska LLC NA 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: ADL0034633, ADL0034636 ENDICOTT / ENDICOTT OIL DUCK IS UNIT MPI 1-63 Plugs Junk measured measured TVD 7" 4-1/2" 10,540' 10,384' 13,196' 12,949' 10,021' 9-5/8"11,790' 9,603' 7,500psi 6,870psi 8,150psi 11,220psi 8,430psi 5,090psi Conductor 107'30"107' 107' Burst 5,020psi Collapse 2,260psiSurface 13-3/8"2,500' Casing 8,530psi Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Grace Christianson at 2:30 pm, Mar 17, 2025 Digitally signed by Justus Hinks (3691) DN: cn=Justus Hinks (3691) Reason: I attest to the accuracy and integrity of this document Date: 2025.03.17 13:17:48 -08'00' Justus Hinks (3691) DSR-3/25/25JJL 4/8/25 RBDMS JSB 060325 Well Name Rig API Number Well Permit Number Start Date End Date END 1-63 Well Diagnostics 50-029-21905-00-00 189-006 2/23/2025 2/23/2025 Hilcorp Alaska, LLC Weekly Operations Summary 2/23/2025 - Sunday T/I/O = 1780/0/0. Temp = SI. Re-Greenstick-IC. ALP = 2160 psi, SI @ CV. Purged IC Packing void with Semi-Fluid Greenstick taking returns out SBS until returns were clean. Used 3/4 packing gun of Semi-Fluid Greenstick to pack secondary seal to 3500 psi. Held pressure for 1 hr. Attempted to purge IC test void w/out success. Used 1/2 packing gun of Semi-Fluid Greenstick to 3500 psi.SBS. Held pressure for 1 hr. Released to Ops for POP. SV, WV, = C. SSV, MV = O. IA, OA = OTG. 16:00 _____________________________________________________________________________________ Revised By: TDF 5/2/2016 SCHEMATIC Duck Island Unit Well: END 1-63 Last Completed: 3/28/2013 PTD: 189-006 TD = 13,196’ (MD) / TD =10,540’(TVD) 30” Initial KB Elev.: 55.25’/ BF Elev.: 16.5 7” 6 10 11 12 18 15 14 9-5/8” 1 4 13 16 & 17 PBTD = 12,905’(MD) / PBTD =10,356’(TVD) 8 TOF @ 12,739’MD 3/20/2016 7” Marker Jt @ 12,110’ 13-3/8” 9 19 2 3 5 7 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 30" Conductor N/A / N/A / N/A N/A Surface 107’ N/A 13-3/8” Surface 68/ NT80/ CYHE 12.415 Surface 2,500 0.150 9-5/8" Intermediate 47 / NT80 / NSCC 8.681 Surface 10,021 0.0732 9-5/8" Intermediate 47/ NT95HS/ NSCC 8.681 10,021 11,790’ 0.0732 7" Liner 29/ SM-110/ Btrs 6.184 11,549’ 13,196’ 0.0372 4-1/2” Liner 12.6/13CR-80/NSCT-TKC 3.958 11,356’ 12,949’ 0.0152 TUBING DETAIL 4-1/2" Tubing 12.6/13CR-80/Vam Top 3.958 Surface 11,370’ 0.0152 JEWELRY DETAIL No Depth Item 1 1,524’ 4-1/2” HES XXO Nipple, ID= 3.813 – Control Cable Installed GLM Detail –MMG w/RK Latch (Sta. 8 has RKP Latch) 2 3,834’ST 8: Port= 16, Dev.= 15, VLV= DOME, TVD= 3,811’, 4/8/2013 3 5,485’ST 7: Port= 20 Dev.= 37, VLV= SO, TVD= 5,232’, 4/8/2013 4 6,853’ST 6: Port= 0, Dev.= 45, VLV= DMY, TVD= 6,213’, 3/25/2013 5 7,716’ST 5: Port= 0, Dev.= 48, VLV= DMY, TVD= 6,810’, 3/25/2013 6 8,581’ST 4: Port= 0, Dev.= 47, VLV= DMY, TVD= 7,398’, 3/25/2013 7 9,448’ST 3: Port= 0, Dev.= 45, VLV= DMY, TVD= 7,993’, 3/25/2013 8 10,357’ST 2: Port= 0, Dev.= 49, VLV= DMY, TVD= 8,625’, 3/25/2013 9 11,139’ST 1: Port= 0, Dev.= 47, VLV= DMY, TVD= 9,138’, 3/25/2013 10 11,217’ 4-1/2” HES X Nipple, ID= 3.813” 11 11,251’ 9-5/8” x 4-1/2” HES TNT Packer, ID= 3.903” 12 11,281’ 4-1/2” X Nipple, ID= 3.813” 13 11,356’ 9-5/8” x 7” Baker C-2 ZXP, ID= 6.24” 14 11,357’ 4-1/2” HES XN Nipple,ID= 3.725” 15 11,369’ 4-1/2” Wireline Entry Guide,Bottom @ 11,370 ~ TVD= 9,298’ 16 11,372’ 9-5/8” x 7” HMC Liner Hanger, ID= 6.210” 17 11,378’ 7” x 4-1/2” XO, ID=3.920” 18 11,549’ 9-5/8” x 7” TIW Hydro Hanger 19 13,020’ 3-3/8”Baker IBP ( Tagged 7/8/2007) PERFORATION DETAIL END Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Shot Date Current Size FV 12,300’ 12,324’ 9,966’ 9,982’ 24 8/7/07 Squeezed 2-7/8” 12,314’ 12,324’ 9,975’ 9,982’ 10 5/15/93 Squeezed 2-1/8” 12,305’ 12,325’ 9,969’ 9,982’ 20 5/7/13 Open 2-7/8” FIV 12,389’ 12,422’ 10,025’ 10,046’ 33 2/27/89 Squeezed 5” 12,391’ 12,411’ 10,026’ 10,039’ 20 7/23/07 Squeezed 2-7/8” 12,392’ 12,422’ 10,027’ 10,046’ 30 5/7/13 Open 2-7/8” 12,400’ 12,420’ 10,032’ 10,045’ 20 2/26/89 Squeezed 5 FIII 12,484’ 12,528’ 10,087’ 10,115’ 44 2/27/89 Squeezed 5 12,485’ 12,505’ 10,088’ 10,101’ 20 5/6/13 Open 2-7/8 12,495’ 12,515’ 10,094’ 10,107’ 20 2/26/89 Squeezed 5 12,505’ 12,530’ 10,101’ 10,117’ 25 5/6/13 Open 2-7/8 FII 12,578’ 12,600’ 10,148’ 10,162’ 22 2/27/89 Squeezed 5 12,580’ 12,600’ 10,149’ 10,162’ 20 5/6/13 Open 2-7/8 12,580’ 12,600’ 10,149’ 10,162’ 20 2/26/89 Squeezed 5 FI 12,679’ 12,699’ 10,213’ 10,225’ 20 3/30/16 Open 2-7/8 12,704’ 12,724’ 10,228’ 10,241’ 20 3/30/16 Open 2-7/8 Ref Log: DLL-GR on 2/21/1989 / Angle at the top perf= 48 Deg. @ 12,350’ OPEN HOLE / CEMENT DETAIL 13-3/8” 3,729 cu/ft Permafrost in 17.5” Hole 9-5/8" 575 cu/ft Class ‘G’ in a 12-1/4” Hole 7” 331 cu/ft Class “G” in 8-1/2” Hole WELL INCLINATION DETAIL Max Hole Angle = 51 deg. @ 12,754’ TREE & WELLHEAD Tree MCEVOY 4-1/16” Model ‘C’ Wellhead MCEVOY 13-5/8” x 4-1/2” DX2 Adapter GENERAL WELL INFO API: 50-029-21905-00-00 Initial Completion by Doyon 15- 3/2/1989 RWO by Doyon 15 – 2/7/1997 RWO by Doyon 14 – 3/31/2013 Perf Add – 3/29/2016 NOTE: MINIMUM ID= 3.725 @ 11,357’ 4-1/2 XN Nipple SAFETY NOTE H2S Reading Average 230 to 260 PPM on A/L & Gas Injections.Well requires SSSV. 4-1/2” Chrome Tubing. Casing Flange Rated to 3,000’ psi. 1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Seal Wellhead Packoff Void Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 13,196 feet 12,905 feet true vertical 10,540 feet 12,739' (Fill)feet Effective Depth measured 12,905 feet 11,251' & 11,356'feet true vertical 10,356 feet 9,215' & 9,288'feet Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# / 13Cr-80 / Vam Top 11,370' 9,298' HES TNT 1,524' MD Packers and SSSV (type, measured and true vertical depth)ZXP LTP HXO SVLN See Above 1,519' TVD 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: Same 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title:Operations Manager Contact Phone: Conductor 107'30"107' 107' Burst 5,020psi Collapse 2,260psi 4,760psi NA NA 8,530psi 7,500psi 6,870psi 8,150psi 11,220psi 8,430psi 5,090psi Surface 10,540' 10,384' 13,196' 12,949' 1,769' 10,021'Intermediate Intermediate Liner 13-3/8" 9-5/8" 2,500' 10,021' 11,790' 9,603' ENDICOTT / ENDICOTT OIL DUCK IS UNIT MPI 1-63 Plugs Junk measured measured TVD 7" 4-1/2" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 189-006 50-029-21905-00-00 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 3. Address: Hilcorp Alaska LLC NA 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: ADL0034633, ADL0034636 Casing Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 103 Gas-Mcf 1850 6347 18503678 81 3046112 311 N/A measured true vertical Packer MD 2,500' Size 2,490' 8,398' Length Liner 1,647' 1,593' 9-5/8" NA Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG 3434 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Ryan Thompson ryan.thompson@hilcorp.com 907-564-5005 Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Grace Christianson at 2:28 pm, Jun 20, 2024 Digitally signed by Sara Hannegan (2519) DN: cn=Sara Hannegan (2519) Date: 2024.06.20 13:37:29 - 08'00' Sara Hannegan (2519) RBDMS JSB 062724 DSR-6/25/24WCB 12-3-2024 Well Name Rig API Number Well Permit Number Start Date End Date END 1-63 Well Diagnostics 50-029-21905-00-00 189-006 5/22/2024 6/7/2024 T/I/O = 300/1830/30. Temp = 175°. Greenstick IC test void (eval IAxOA). ALP = 2320 psi, online. RU packing gun to test port and pumped 1 gun of greenstick. Will return to resume pumping more greenstick (job not completed). SV = C. WV, SSV, MV = O. IA, OA = OTG. 13:30 6/5/2024 - Wednesday 6/7/2024 - Friday T/I/O = 300/1830/40. Temp = 175°. Greenstick IC test void (eval IAxOA). ALP = 2320 psi, online. RU packing gun to test port and pumped 1/2 gun of greenstick. Held pressure for 1 hr to produce a good pack. SV = C. WV, SSV, MV = O. IA, OA = OTG. 13:30 5/21/2024 - Tuesday T/I/O = SSV/0/0. Temp = SI. Green stick IC test void/packoff RU PKG gun to PKG port Hoke valve. pump Greenstick, got returns of J-stick & hydr. fluid from off side port, pumped 2 gun loads.RD, secure well. 6/4/2024 - Tuesday T/I/O = 300/1830/720. Temp = 175°. Greenstick IC test void (eval IAxOA). ALP = 2320 psi, online. Bled OAP to BT to 0 psi in 1 hr and held open bleed for duration of job. RU packing gun to test port and pumped 3 1/2 guns of greenstick (job not complete) 5/22/2024 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary T/I/O = SSV/0/0. Temp = SI. Green stick IC test void/packoff RU PKG gun to PKG port Hoke valve. Pumped Greenstick, got returns of Greenstick from offside port, pumped 4 gun loads total, held pressure for 1 hr. to ensure good pack. RU to TEST port Hoke valve, pumped greenstick into test void, got returns of hyd. fluid & J-stick from offside port. RD, secure well 5/23/2024 - Thursday T/I/O = SSV/0/0. Temp = SI. Green stick IC test void/packoff RU PKG gun to TEST port Hoke valve, pumped Greenstick, good returns from off side port. Held pressure for 1 hr to ensure good pack. Pumped 4 gun loads total into TEST void. RD, secure well. Pumped Greenstick, got returns of Greenstick from offside port, pumped 4 gun loads total, RU PKG gun to TEST port Hoke valve, pumped Greenstick, good returns from off side port. Held pressure for 1 hr to ensure good pack. Pumped 4 gun loads total into TEST void. RU PKG gun to PKG port Hoke valve. pump Greenstick, got returns of J-stick & hydr. fluid from off side port, pumped 2 gun loads.RD, RU packing gun to test port and pumped 1/2 gun of greenstick. Held pressure for 1 hr to produce a good pack _____________________________________________________________________________________ Revised By: TDF 5/2/2016 SCHEMATIC Duck Island Unit Well: END 1-63 Last Completed: 3/28/2013 PTD: 189-006 TD = 13,196’ (MD) / TD =10,540’(TVD) 30” Initial KB Elev.: 55.25’/ BF Elev.: 16.5 7” 6 10 11 12 18 15 14 9-5/8” 1 4 13 16 & 17 PBTD = 12,905’(MD) / PBTD =10,356’(TVD) 8 TOF @ 12,739’MD 3/20/2016 7” Marker Jt @ 12,110’ 13-3/8” 9 19 2 3 5 7 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 30" Conductor N/A / N/A / N/A N/A Surface 107’ N/A 13-3/8” Surface 68/ NT80/ CYHE 12.415 Surface 2,500 0.150 9-5/8" Intermediate 47 / NT80 / NSCC 8.681 Surface 10,021 0.0732 9-5/8" Intermediate 47/ NT95HS/ NSCC 8.681 10,021 11,790’ 0.0732 7" Liner 29/ SM-110/ Btrs 6.184 11,549’ 13,196’ 0.0372 4-1/2” Liner 12.6/13CR-80/NSCT-TKC 3.958 11,356’ 12,949’ 0.0152 TUBING DETAIL 4-1/2" Tubing 12.6/13CR-80/Vam Top 3.958 Surface 11,370’ 0.0152 JEWELRY DETAIL No Depth Item 1 1,524’ 4-1/2” HES XXO Nipple, ID= 3.813 – Control Cable Installed GLM Detail –MMG w/RK Latch (Sta. 8 has RKP Latch) 2 3,834’ST 8: Port= 16, Dev.= 15, VLV= DOME, TVD= 3,811’, 4/8/2013 3 5,485’ST 7: Port= 20 Dev.= 37, VLV= SO, TVD= 5,232’, 4/8/2013 4 6,853’ST 6: Port= 0, Dev.= 45, VLV= DMY, TVD= 6,213’, 3/25/2013 5 7,716’ST 5: Port= 0, Dev.= 48, VLV= DMY, TVD= 6,810’, 3/25/2013 6 8,581’ST 4: Port= 0, Dev.= 47, VLV= DMY, TVD= 7,398’, 3/25/2013 7 9,448’ST 3: Port= 0, Dev.= 45, VLV= DMY, TVD= 7,993’, 3/25/2013 8 10,357’ST 2: Port= 0, Dev.= 49, VLV= DMY, TVD= 8,625’, 3/25/2013 9 11,139’ST 1: Port= 0, Dev.= 47, VLV= DMY, TVD= 9,138’, 3/25/2013 10 11,217’ 4-1/2” HES X Nipple, ID= 3.813” 11 11,251’ 9-5/8” x 4-1/2” HES TNT Packer, ID= 3.903” 12 11,281’ 4-1/2” X Nipple, ID= 3.813” 13 11,356’ 9-5/8” x 7” Baker C-2 ZXP, ID= 6.24” 14 11,357’ 4-1/2” HES XN Nipple,ID= 3.725” 15 11,369’ 4-1/2” Wireline Entry Guide,Bottom @ 11,370 ~ TVD= 9,298’ 16 11,372’ 9-5/8” x 7” HMC Liner Hanger, ID= 6.210” 17 11,378’ 7” x 4-1/2” XO, ID=3.920” 18 11,549’ 9-5/8” x 7” TIW Hydro Hanger 19 13,020’ 3-3/8”Baker IBP ( Tagged 7/8/2007) PERFORATION DETAIL END Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Shot Date Current Size FV 12,300’ 12,324’ 9,966’ 9,982’ 24 8/7/07 Squeezed 2-7/8” 12,314’ 12,324’ 9,975’ 9,982’ 10 5/15/93 Squeezed 2-1/8” 12,305’ 12,325’ 9,969’ 9,982’ 20 5/7/13 Open 2-7/8” FIV 12,389’ 12,422’ 10,025’ 10,046’ 33 2/27/89 Squeezed 5” 12,391’ 12,411’ 10,026’ 10,039’ 20 7/23/07 Squeezed 2-7/8” 12,392’ 12,422’ 10,027’ 10,046’ 30 5/7/13 Open 2-7/8” 12,400’ 12,420’ 10,032’ 10,045’ 20 2/26/89 Squeezed 5 FIII 12,484’ 12,528’ 10,087’ 10,115’ 44 2/27/89 Squeezed 5 12,485’ 12,505’ 10,088’ 10,101’ 20 5/6/13 Open 2-7/8 12,495’ 12,515’ 10,094’ 10,107’ 20 2/26/89 Squeezed 5 12,505’ 12,530’ 10,101’ 10,117’ 25 5/6/13 Open 2-7/8 FII 12,578’ 12,600’ 10,148’ 10,162’ 22 2/27/89 Squeezed 5 12,580’ 12,600’ 10,149’ 10,162’ 20 5/6/13 Open 2-7/8 12,580’ 12,600’ 10,149’ 10,162’ 20 2/26/89 Squeezed 5 FI 12,679’ 12,699’ 10,213’ 10,225’ 20 3/30/16 Open 2-7/8 12,704’ 12,724’ 10,228’ 10,241’ 20 3/30/16 Open 2-7/8 Ref Log: DLL-GR on 2/21/1989 / Angle at the top perf= 48 Deg. @ 12,350’ OPEN HOLE / CEMENT DETAIL 13-3/8” 3,729 cu/ft Permafrost in 17.5” Hole 9-5/8" 575 cu/ft Class ‘G’ in a 12-1/4” Hole 7” 331 cu/ft Class “G” in 8-1/2” Hole WELL INCLINATION DETAIL Max Hole Angle = 51 deg. @ 12,754’ TREE & WELLHEAD Tree MCEVOY 4-1/16” Model ‘C’ Wellhead MCEVOY 13-5/8” x 4-1/2” DX2 Adapter GENERAL WELL INFO API: 50-029-21905-00-00 Initial Completion by Doyon 15- 3/2/1989 RWO by Doyon 15 – 2/7/1997 RWO by Doyon 14 – 3/31/2013 Perf Add – 3/29/2016 NOTE: MINIMUM ID= 3.725 @ 11,357’ 4-1/2 XN Nipple SAFETY NOTE H2S Reading Average 230 to 260 PPM on A/L & Gas Injections.Well requires SSSV. 4-1/2” Chrome Tubing. Casing Flange Rated to 3,000’ psi. STATE OF ALASKA ' AOKA OIL AND GAS CONSERVATION CO SION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon U Plug Perforations U Fracture Stimulate ❑ Pull Tubing[J Operations shutdown LI Performed: Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing❑ Change Approved Program ❑ Plug for Redrill ❑ arforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Name: 4.Well Class Before Work: 5.Permit to Drill Number: Hilcorp Alaska LLC Development 0 Exploratory ❑ 189-006 3.Address: Stratigraphic El Service ❑ 6.API Number: 3800 Centerpoint Dr,Suite 1400 50-029-21905-00-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0034633/ADL0034636 DUCK IS UNIT MPI 1-63 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A ENDICOTT/ ENDICOTT OIL MAY 0 2 2016 11.Present Well Condition Summary: ((�� Total Depth measured 13,196 feet Plugs measured 12,905 fe OGCC true vertical 10,540 feet Junk measured 12,739'(Fill) feet Effective Depth measured 12,905 feet Packer measured 11,251'&11,356' feet true vertical 10,356 feet true vertical 9,215'&9,288' feet Casing Length Size MD TVD Burst Collapse Conductor 107' 30" 107' 107' N/A N/A Surface 2,500' 13-3/8" 2,500' 2,490' 5,020psi 2,260psi Intermediate 10,021' 9-5/8" 10,021' 8,398' 6,870psi 4,760psi Intermediate 1,769' 9-5/8" 11,790' 9,603' 8,150psi 5,090psi Liner 1,647' 7" 13,196' 10,540' 11,220psi 8,530psi Liner 1,593' 4-1/2" 12,949' 10,384' 8,430psi 7,500psi Perforation depth Measured depth See Attached Schematic R JUN alb SCANK True Vertical depth See Attached Schematic Tubing(size,grade,measured and true vertical depth) 4-1/2" 12.6#/13Cr-80/Vam Top 11,370' 9,298' HES TNT 1,524'MD Packers and SSSV(type,measured and true vertical depth) ZXP LTP HXO SVLN See Above 1,519'TVD 12.Stimulation or cement squeeze summary: N/A Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 47 1,644 1,462 1,600 730 Subsequent to operation: 129 4,020 3,644 1,650 289 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory Development ID Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run El 16.Well Status after work: Oil 0 Gas El WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ El WAG ❑ GINJ El SUSP❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 316-152 Contact Taylor Wellman 'rill Email twellman(a�hilcorp.com Printed Name7/A Mike Du Title Operations Manager Signature ,,,d Phone 777-8382 Date 5/2/2016 Form 10-404 Revised 5/2015 /s Ste'f_`4- / 074 RBDMS LV MAI 0 3 2016 Submit Original Only , 13 H . • Duck Island Unit Well: END 1-63 SCHEMATIC Last Completed: 3/28/2013 Hi!carp Alaska,lit PTD: 189-006 TREE&WELLHEAD OPEN HOLE/CEMENT DETAIL Initial KB Elev.:55.25'/BF Elev.:16.5 Tree MCEVOY 4-1/16"Model'C' _ 13-3/8" 3,729 cu/ft Permafrost in 17.5"Hole .,,,,,..,„ Wellhead MCEVOY 13-5/8"x 4-1/2"DX2 Adapter 9-5/8" 575 cu/ft Class'G'in a 12-1/4"Hole3„41 ,' ,' 7" 331 cu/ft Class"G"in 8-1/2"Hole .: CASING DETAIL w 1 Size Type Wt/Grade/Conn ID Top Btm BPF 133/8"4'' 30" Conductor N/A/N/A/N/A N/A Surface 107' N/A 13-3/8" Surface 68/NT80/CYHE 12.415 Surface 2,500 0.150 gm 2 9-5/8" Intermediate 47/NT80/NSCC 8.681 Surface 10,021 0.0732 9-5/8" Intermediate 47/NT95HS/NSCC 8.681 10,021 11,790' 0.0732 11121 3 7" Liner 29/SM-110/Btrs 6.184 11,549' 13,196' 0.0372 4-1/2" Liner 12.6/13CR-80/NSCT-TKC 3.958 11,356' 12,949' 0.0152 iii 4 TUBING DETAIL 4-1/2" Tubing 12.6/13CR-80/Vam Top 3.958 Surface 11,370' 0.0152 leg 5 WELL INCLINATION DETAIL Max Hole Angle=51 deg. @ 12,754' el 6 JEWELRY DETAIL No Depth Item 7 1 1,524' 4-1/2"HES XXO Nipple,ID=3.813-Control Cable Installed GLM Detail-MMG w/RK Latch(Sta.8 has RKP Latch) Ind 8 2 3,834' ST 8:Port=16,Dev.=15,VLV= DOME,TVD= 3,811',4/8/2013 i l...1 ' NOTE: 3 5,485' ST 7:Port=20 Dev.=37,VLV=SO,TVD= 5,232',4/8/2013 w MINIMUM ID= 4 6,853' ST 6:Port=0,Dev.=45,VLV=DMY,TVD= 6,213', 3/25/2013 m 9 3.725 @ 11,357' 5 7,716' ST 5:Port=0,Dev.=48,VLV=DMY,TVD= 6,810',3/25/2013 10 4-1/2 XN Nipple 6 8,581' ST 4:Port=0,Dev.=47,VLV=DMY,TVD= 7,398',3/25/2013 Ill 6�4 7 9,448' ST 3:Port=0,Dev.=45,VLV=DMY,TVD= 7,993',3/25/2013 j-. �_ 11 8 10,357' ST 2:Port=0,Dev.=49,VLV=DMY,TVD= 8,625', 3/25/2013 9 11,139' ST 1:Port=0,Dev.=47,VLV=DMY,TVD= 9,138',3/25/2013 =r 12 10 11,217' 4-1/2"HES X Nipple,ID=3.813" `'' 11 11,251' 9-5/8"x 4-1/2"HES TNT Packer,ID=3.903" I I I~. 12 11,281' 4-1/2"X Nipple,ID=3.813" `r r 1 14 13 13 11,356' 9-5/8"x 7"Baker C-2 ZXP,ID=6.24" 15 �. 16&17 .R 14 11,357' 4-1/2"HES XN Nipple,ID=3.725" ''il\ 15 11,369' 4-1/2"WirelineEntryGuide,Bottom@11,370"TVD=9,298' 16 11,372' 9-5/8"x 7"HMC Liner Hanger,ID=6.210" 17 11,378' 7"x 4-1/2"XO,ID=3.920" f.-1,. 18 11,549' 9-5/8"x 7"TIW Hydro Hanger }' ";'"' 19 13,020' 3-3/8"Baker IBP(Tagged 7/8/2007) PERFORATION DETAIL ` END Sands Top(MD) Btm(MD) Top(TVD) Btm(TVD) FT Shot Date Current Size 18 12,300' 12,324' 9,966' 9,982' 24 8/7/07 Squeezed 2-7/8" 1* FV 12,314' 12,324' 9,975' 9,982' 10 5/15/93 Squeezed 2-1/8" 12,305' 12,325' 9,969' 9,982' 20 5/7/13 Open 2-7/8" 12,389' 12,422' 10,025' 10,046' 33 2/27/89 Squeezed 5" 9-5/8"a ' Il FIV 12,391' 12,411' 10,026' 10,039' 20 7/23/07 Squeezed 2-7/8" 12,392' 12,422' 10,027' 10,046' 30 5/7/13 Open 2-7/8" 7"Markerit 12,400' 12,420' 10,032' 10,045' 20 2/26/89 Squeezed 5 @12,110 12,484' 12,528' 10,087 10,115' 44 2/27/89 Squeezed 5 FIll 12,485' 12,505' 10,088' 10,101' 20 5/6/13 Open 2-7/8 12,495' 12,515' 10,094' 10,107' 20 2/26/89 Squeezed 5 TOF@12739 ND 12,505' 12,530' 10,101' 10,117' 25 5/6/13 Open 2-7/8 3/2D/2016 12,578' 12,600' 10,148' 10,162' 22 2/27/89 Squeezed 5 FII 12,580' 12,600' 10,149' 10,162' 20 5/6/13 Open 2-7/8 ,1� 12,580' 12,600' 10,149' 10,162' 20 2/26/89 Squeezed 5 Y' 12,679' 12,699' 10,213' 10,225' 20 3/30/16 ✓ Open 2-7/8 f Fl 12,704' 12,724' 10,228' 10,241' 20 3/30/16 " Open 2-7/8 7" '7 ," 4*i1 Ref Log:DLL-GR on 2/21/1989/Angle at the top perf=48 Deg.@ 12,350' TD=13,196'(MD)/TD=10,540'(TVD) SAFETY NOTE GENERAL WELL INFO PBTD=12,905'(MD)/PBTD=10,356'(TVD) H2S Reading Average 230 to 260 PPM API:50-029-21905-00-00 on A/L&Gas Injections.Well requires Initial Completion by Doyon 15-3/2/1989 SSSV.4-1/2"Chrome Tubing.Casing RWO by Doyon 15-2/7/1997 Revised By:TDF 5/2/2016 Flange Rated to 3,000'psi. RWO by Doyon 14-3/31/2013 Perf Add-3/29/2016 • • Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date END 1-63 50-029-21905-00-00 189-006 3/2/16 4/2/16 Daily Operations: 3/2/2016-Wednesday BEGIN R/U .125" SS WIRE,T/S=10'x2-1/8", OJS, LSS(oal=25.42' R/U COMPLETE, PT PCE TO 250psi LOW, 2,050psi HIGH. RIH W/2'x1-7/8", 3.8. OOH, SIBD, C/O TOOLS RIH W/4-1/2" GS (3/8" brass) 8' PRONG, LATCH UP @ 1,995' SLM,JAR UP FOR 60 MIN CANT PULL SCSSSV, NEVER LOST CONTROL LINE INTEGRITY. SHEAR OFF TO CUT 100' OF WIRE. POOH OOH,SIBD, INSTALL TREE CAP, SECURE WELL, C/O TOOLS, CUT 100' OF WIRE. 3/3/2016-Thursday PJSM, LIFT PLAN, BEGIN R/U .125" SS,T/S=8'x2-5/8, OJS, KJ, LSS "R/U COMPLETE, P/T PCE TO 250PSI LOW, 2,050PSI HIGH, TAKE CONTROL OF SSV&SCSSSV RIH WI 4-1/2" GS (3/8" brass) 8' PRONG, LATCH UP @ 1,995' SLM,JAR UP FOR 40 MIN AND TOOLS COME FREE 100 LBS OVER PUW. POOH WI 4-1/2" QOS SCS. OOH SIBD C/O TOOL, SWAP BACK TO 10'x2-1/8". RIH WI 4-1/2" GR, KEYLESS X-LOCK W/XN CATCHER SUB,TAGGED XN NIP @ 11,321' SLM 11,362' ELMD (CORRECTION TO ELMD=41')OOH, SIBD, C/O TOOLS,SWAP TO 5'x2-1/8" RIH W/ 16' OF 3" DRIFT,TOOLS FALL FREELY TO TOP OF FILL @ 12,662' SLM, 12,703' ELMD.THIS IS 37'ABOVE TARGET DEPTH IN THE JOB PROCEDURE, NOTIFY REP THAT BAILER RUNS ARE NEEDED. OOH, SIBD, C/O TOOLS, SWAP TO 8'x 1-7/8", M/U 10'x3" PUMP BAILER W/FLAPPER MULE SHOE BTM RIH W/10'X3" PUMP BAILER WI FLAPPER MULE SHOE BTM, S/D @ 12,662' SLM, WORK PUMP FILL IS NOT STICKY, 15 MINUTES AND PUMP STOPS WORKING. POOH MAYBE 2' GAINED HARD TO TELL. OOH SIBD, 3" BAILER RECOVERY SECTION COMPLETELY FULL OF SAND, CLEAN UP BAILER AND BEGIN R/D FOR THE NIGHT. R/D COMPLETE, MOVE UNIT TO EDGE OF PAD SO THAT LOADER CAN CLEAR LARGE DRIFTS IN OUR WORK AREA. END TICKET. 3/4/2016- Friday No activity to report. 3/5/2016-Saturday No activity to report. 3/6/2016-Sunday No activity to report. 3/7/2016- Monday No activity to report. 3/8/2016-Tuesday No activity to report. • • Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date END 1-63 Slickline 50-029-21905-00-00 189-006 3/2/16 4/2/16 Daily Operations: "' 3/9/2016-Wednesday No activity to report. 3/10/2016-Thursday No activity to report. 3/11/2016- Friday No activity to report. 3/12/2016-Saturday No activity to report. 3/13/2016-Sunday RU AND P/T SURFACE EQUIPMENT TO 250 PSI LOW 2,050 PSI HIGH. MADE 6 PUMP BAILER RUNS TO REMOVE SAND FROM 12,662' SLM TO 12,673'SLM. TOP OF FILL IS NOW 12,714' ELMD. 3/14/2016- Monday RU AND P/T SURFACE EQUIPMENT TO 250psi LOW 2,050psi HIGH. MADE 7 PUMP BAILER RUNS w/ 15' x 3.50 PUMP BAILER TO REMOVE FRAC SAND FROM 12,673'SLM TO 12,682' SLM,TOP OF FILL IS NOW 12,723'. 17' OF SAND STILL NEEDS TO BE REMOVED TO GET TO TARGET DEPTH OF 12,740' ELMD FOR ADPERF JOB. 3/15/2016-Tuesday RU AND PIT SURFACE EQUIPMENT TO 250 LOW 2050 HIGH CORRECTION TO ELMD=41' FROM WSR 3-3-16. RUN 15' 3"" BAILER& SIT DOWN @ 12,682' SLM, WORK BAILER TO 12,684' SLM, RECOVERED 6' OF FRAC SAND. RUN 15' 3"" BAILER & SIT DOWN @ 12,688' SLM,WORK BAILER TO 12,690' SLM, POOH... RECOVERED 5' OF FRAC SAND. RUN 15' 3"" BAILER &SIT DOWN @ 12,691' SLM, WORK BAILER TO 16,693'SLM, RECOVERED 7' OF FRAC SAND. CONTINUE JOB ON 03/16/2016 . • Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date END 1-63 Slickline 50-029-21905-00-00 189-006 3/2/16 4/2/16 Daily Operations: 3/16/2016-Wednesday PT 250/2,500 PSI (GOOD TESTS). RUN A 4.5" X-LINE,4.5" X-LOCK (NO PACKING),4.5" PLUG BOTTOM, OAL=50", LOCATE AND SIT DOWN @ X-NIPPLE 11,244' SLM (11,285' MD)41' CORRECTION. RUN 5' DRIVE DOWN BAILER AND SIT DOWN @ 12,693' SLM,JAR DOWN 25 MINUTES, BAILER CAME BACK EMPTY. RUN 3.5" LIB AND TAG HARD FRAC SAND @ 12,693' SLM. 12,734' CORRECTED DEPTH. 3/17/2016-Thursday RUN 10' 3" PUMP BAILER (FLAPPER BOTTOM), BAILER EMPTY. RUN 5' 1-7/8" STEM, KJ, 2.70" CENT, 3.0" CENTER SPEAR. OAL=103", SIT DOWN @ 12,691' SLM WORK TOOLS TO 12,692' SLM. RUN 2" DD BAILER (BALL BOTTOM) FILL 1/2 THE BAILER WITH SAND. RUN 5' 1-7/8" STEM, KJ, 2.70" CENT, 3.0" CENTER SPEAR. OAL=103", SIT DOWN @ 12,691'SLM WORK TOOLS TO 12,692' SLM. 12,733' MD. 3/18/2016- Friday PT 250/2,500 PSI (GOOD TESTS)41' CORRECTION. RUN 5' 2.5" DD BAILER (BALL BOTTOM). SIT DOWN @ 12,691' SLM, WORK TOOLS DOWN TO 12,692.5' SLM, BAILER EMPTY. RUN 10' 2.5" PUMP BAILER (BALL BOTTOM),SIT DOWN @ 12,691' SLM, WORKED BAILER 20 MINUTES, BAILER EMPTY. RUN QC, 5' 1 7/8" STEM, 2.70" CENT, 3.0" CENTER SPEAR AND SIT DOWN @ 12,691' SLM, WORK TOOLS DOWN TO 12,693' SLM, GOT STUCK A FEW TIMES AND PULLED FREE WITH 600#OJ LICKS. RUN 5' 2.25" DD BAILER (FLAPPER BOTTOM), SIT DOWN @ 12,693' SLM, BAILER CAME BACK EMPTY. RUN 10' 2.5" PUMP BAILER (BALL BOTTOM), SIT DOWN @ 12,693' SLM, WORK TOOLS DOWN TO 12,694', RECOVERED 2' OF SAND. 3/19/2016-Saturday 41' CORRECTION, PT 250/2,500 PSI (GOOD TESTS). RUN QC, 5' 1 7/8" STEM, 2.70" CENT, 3.0" CENTER SPEAR AND SIT DOWN @ 12,693'SLM, WORK TOOLS DOWN TO 12,696' SLM. RUN A 10' 2.5" PUMP BAILER ( BALL BOTTOM), SIT DOWN @ 12,694' SLM, BAILER EMPTY. RUN A 10' 3" PUMP BAILER (FLAPPER BOTTOM), SIT DOWN @ 12,694' SLM, BAILER EMPTY. RUN QC, 5' 1 7/8" STEM, 2.70" CENT, 3.0" CENTER SPEAR AND SIT DOWN @ 12,696' SLM, WORK TOOLS DOWN TO 12,697' SLM. RUN 10' 2.5" PUMP BAILER (FLAPPER BOTTOM), SIT DOWN @ 12,692, WORK TOOLS DOWN TO 12,696' SLM, 12,737' MD. BAILER EMPTY. 3/20/2016-Sunday PT 250/2,500 PSI (GOOD TESTS),41' CORRECTION. RUN 5FT 1 7/8 STEM, 2.5" CENT, 2.04" GUAGE RING OAL: 86", SIT DOWN @ 12,695'SLM, WORK TOOLS DOWN TO 12,697' SLM. RUN 5' 2.25" DD BAILER (FLAPPER BOTTOM), SIT DOWN @ 12,697' SLM,JARRED BAILER DOWN TO 12,698.5' SLM. RUN 10' 3" PUMP BAILER (FLAPPER BOTTOM), SIT DOWN @ 12,697' SLM, MADE IT DOWN TO 12,698' SLM, 12,739' MD. BAILER EMPTY. RDMO. 3/21/2016- Monday No activity to report. 3/22/2016-Tuesday No activity to report. • yn ; Hi corpAlaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date END 1-63 Slickline 50-029-21905-00-00 189-006 3/2/16 4/2/16 Daily Operations: � i' 3/23/2016-Wednesday No activity to report. 3/24/2016-Thursday No activity to report. 3/25/2016 - Friday No activity to report. 3/26/2016-Saturday No activity to report. 3/27/2016-Sunday No activity to report. 3/28/2016- Monday No activity to report. 3/29/2016-Tuesday LOW PT AT 250PS1 (5 MIN). HIGH PT AT 4,200PSI (10 MIN). RIH WITH HEAD (11X3 WP)/ERS/GR-CCL/20' X 2.88". HSD LOADED 2906 POWERJET OMEGA. OAL= 31'/OAW=30014/ Max OD =3.16" (SWELL AFTER SHOOTING) PERFORATE INTERVAL 12,7023241, CCL TO TOP SHOT=3.44', CCL STOP DEPTH = 12700.56'. PERFORATED INTERVAL 12,679' - 12,699', CCL TO TOP SHOT=3.44', CCL STOP DEPTH = 1275.56'. • I Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date END 1-63 Slickline 50-029-21905-00-00 189-006 3/2/16 4/2/16 Daily Operations: ",i 3/30/2016-Wednesday No activity to report. 3/31/2016-Thursday "***WELL S/I ON ARRIVAL*** (set scsssv). RU AND P/T SURFACE EQUIPMENT TO 250 LOW 2,050 HIGH. DRIFTED TO XXO NIPPLE @ 1,495' SLM, 1,524' MD W/3.79" G-RING, BLB AND 3.84" NO GO CENT. WE REALIZED THAT A BBE SSSV WILL NOT WORK IN AN XXO NIPPLE, NOTIFED COMPLETIONS SHOP TO GET 4-1/2" QOS READY 4/1/2016- Friday No activity to report. 4/2/2016-Saturday "***WELL FLOWING ON ARRIVAL*** CONTINUED FROM WSR 3-31-16 (set scsssv). RU AND P/T SURFACE EQUIPMENT TO 250 LOW 2,050 HIGH. SET 4-1/2" CONTROL OPERATED Q05 ser#(HQ05-43) IN XXO NIPPLE @ 1,495' SLM, 1,524' MD. RDMO TO END 4-14A. 4/3/2016-Sunday No activity to report. 4/4/2016- Monday No activity to report. 4/5/2016 Tuesday No activity to report. • • 0,'"s'1///>..,_-4',5.,OFTHE STATE Alaska Oil and Gas ' o Conservation Commission fALAs A t€Sri 333 West Seventh Avenue I. GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 OFA S� Fax: 907.276.7542 www.aogcc.alaska.gov Mike Dunn Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 NEa MAS 16 Z Anchorage, AK 99503 %W ED Endicott Field, Endicott Oil Pool, DIU MPI 1-63 Permit to Drill Number: 189-006 Sundry Number: 316-152 Dear Mr. Dunn: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster Chair DATED this 2Aay of February, 2016. RBDMS LL rEg 2 6 2016 • • RECEIVEU STATE OF ALASKA FEB 2 2 2016 • ALASKA OIL AND GAS CONSERVATION COMMISSION arS Z/ 24. (( to APPLICATION FOR SUNDRY APPROVALS Anocr 20 AAC 25.280 1.Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate 0 • Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑ 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: Hilcorp Alaska LLC Exploratory ❑ Development ❑✓ • 189-006 - 3.Address: ❑ 6.API Number: Stratigraphic ❑ Service 3800 Centerpoint Dr,Suite 1400 50-029-21905-00-00 - 7.If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? C.O. 462 ' Will planned perforations require a spacing exception? Yes ❑ No 0 DUCK IS UNIT MPI 1-63 - 9. Property Designation(Lease Number): 10.Field/Pool(s): ADL0034633/ADL0034636 • ENDICOTT/ENDICOTT OIL • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 13,196' - 10,540' • 12,905' 10,356' 3,805 12,905' N/A Casing Length Size MD TVD Burst Collapse Conductor 107' 30" 107' 107' N/A N/A Surface 2,500' 13-3/8" 2,500' 2,490' 5,020psi 2,260psi Intermediate 10,021' 9-5/8" 10,021' 8,398' 6,870psi 4,760psi Intermediate 1,769' 9-5/8" 11,790' 9,603' 8,150psi 5,090psi Liner 1,647' 7" 13,196' 10,540' 11,220psi 8,530psi Liner 1,593' 4-1/2" 12,949' 10,384' 8,430psi 7500 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attached Schematic See Attached Schematic 4-1/2" 12.6#/13Cr-80/Vam Top 11,370' Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): HES TNT Pkr&Bkr ZXP LTP and HXO SVLN 11,251'MD/9,215'TVD&11,356'MD/9,288"TVD and 1,524'MD/ 1,519'TVD 12.Attachments: Proposal Summary ❑ Wellbore schematic ❑ 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development 0 Service ❑ 14. Estimated Date for 15.Well Status after proposed work: 3/7/2016 Commencing Operations: OIL 0 • WINJ ❑ WDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Taylor Wellman TTil B Email twellmane,hilcorp.com Printed Name i:. W +�' ' r Title Operations Manager Signature ,/// Phone 777-8345 Date 7/244 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number\ \S Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Post Initial Injection MIT Req'd? Yes ❑ No ❑ RBDMS \.'v E 2016 Spacing Exception Required? Yes ❑ No lig Subsequent Form Required: 10•_ 41 Opti APPROVED BY Approved by: f.!/..441COMMISSIONER THEeCOMMISSIONpDate: Z,...L4 Rn 1 1 , l \ Submit n FormDuplicate ate Form 10-403 Rsed 11/2015 Approved application is vali f r t r h a of approval. Attachments in Duplicate e- 2�Z3-rL z 2-.3-/6' �tf • • Add Perf Well: END 1-63 PTD: 189-006 Hdcorp Alaska,LIG API: 50-029-21905-00-00 Well Name: END 1-63 API Number: 50-029-21905-00-00 Current Status: Flowing w/Gas Lift Rig: SL+ EL Estimated Start Date: March 7, 2016 Estimated Duration: 3 Reg.Approval Req'std? YES Date Reg.Approval Rec'vd: Regulatory Contact: Tom Fouts 777-8398 Permit to Drill Number: 189-006 First Call Engineer: Taylor Wellman (907) 777-8449 (0) (907)947-9533 (M) Second Call Engineer: Wyatt Rivard (907) 777-8547 (0) (509) 670-8001 (M) Current Bottom Hole Pressure: 3606 psi @ 10,000' TVD (Based on SBHPS on 5/14/14) Maximum Expected BHP: 4805 psi @ 10,000' TVD (Based on UPSZFIV/FV Virgin Press Gradient) Max. Proposed Surface Pressure: 3805 psi (Based on: MPSP= Max BHP-(0.1 psi/ft x 10,000 TVD) Reference Log: SLB Slim Cement Mapping Tool Log (SCMT) dated 05May2013 Brief Well Summary: The well is currently flowing steady with the assistance of gaslift.This well was originally drilled and completed in the Upper Subzone F2, F3, & F4 in 1989.The FV perfs were added in 1993 and is likely contributing most gas production through time.A RWO in 1997 upsized the tubing from 3-1/2" to 4-1/2" tubing. An HCI acid stim occurred in 2003.This was followed by a plugback Isolating all but FIV& FV perfs in 2007.The well had several sand production issues from 2007 to 2013, when a RWO to cement in place a 4-1/2" chrome scab liner inside 7" casing. All original zones were re-opened at that time (FII, FIII, FIV, & FV).These zones were acidized in 2014. The Fl targets are likely accessible with some slickline bailing of sand/scale and are likely laminated pay, as seen in the 2-26 perf job in Jan 2016. This well currently flows 107bopd,4,364bwpd (97.6%WC)with the assistance of"4MMcfd gaslift. Current SSSV in well: 4-1/2"QOS SSSV(SER#QOS-17, steel secondary lockdown, control operated, 3 sets std pkg w/ o-ring center, oal=91"w/lock open) set on 07/22/14. Objective: Using E-Line add perforations to the UPSZ Fl in the following intervals: Gun Run# UPSZ Perf Top Perf Bottom Perf Length 1 I 12,708 12,728 20 2 I 12,684 12,704 20 Total 40 Table 1:END 1-63 Proposed Gun Runs Procedure: Slick Line 1. MIRU SL unit and pressure test to 250psi low and ^'2050 psi high. 2. RIH and pull 4-1/2" QOS SSSV, POOH. v 3. Drift for 2-7/8" dummy gun. a. Target depth to achieve is 12,760' md. b. Note the depth correction between the SLB SCMT 05May2013 and the tubing tally dated is "'5' (add 5' to the tubing tally depths). 4. Contingency: If tag depth is above 12,740' md, MU bailer assembly and attempt to clean fill to gain depth in well. • • Add Perf Well: END 1-63 PTD: 189-006 Hacurp.va•ka,LL, API: 50-029-21905-00-00 5. RD slick line. Eline 6. RU EL unit and pressure test to 250 psi low 4000 psi high. 7. MU perforating tool string with 2-7/8" guns. 8. RIH, correlate and perforate 1st gun run (±12,708' to ±12,728'md) as per Table 1: END 1-63 Proposed Gun Runs. POOH. a. Contact Ops Engineer: Taylor Wellman (907) 947-9533 or Wyatt Rivard (509) 670-8001 prior to RIH and for confirmation of tie-in prior to perforating. b. Note any tubing pressure change in WSR. c. Reference log: SLB Slim Cement Mapping Tool Log (SCMT) dated 05May2013. 9. Repeat steps 6-8 for gun run #2 (±12,684' to ±12,704'md) as per Table 1: END 1-63 Proposed Gun Runs. 10. RD Eline. Slick Line 11. MIRU SL unit and pressure test to 250psi low and 2050/4000 psi high. a. High pressure test to be determined by WHP post perforating. 12. MU 4-1/2" QOS (control line operated) SSSV and set in nipple @1,524'. POOH. 13. RD SL Attachments: As-built/ Proposed Well Schematic • • Duck Island Unit II Well: END 1-63 SCHEMATIC Last Completed: 3/28/2013 flacon,Alaska.LI.0 PTD: 189-006 TREE&WELLHEAD OPEN HOLE/CEMENT DETAIL Initial KB Elev.:55.25'/BF Elev.:16.5 Tree MCEVOY 4-1/16"Model'C' 13-3/8" 3,729 cu/ft Permafrost in 17.5"Hole Wellhead MCEVOY 13-5/8"x 4-1/2"DX2 Adapter 9-5/8" _ 575 cu/ft Class'G'in a 12-1/4"Hole l.4 7" 331 cu/ft Class"G"in 8-1/2"Hole 3 or At: v..L . I CASING DETAIL 14. Size Type Wt/Grade/Conn ID Top Btm BPF 30" Conductor N/A/N/A/N/A N/A _ Surface 107' N/A 13-3/8",21 13-3/8" Surface 68/NT80/CYHE 12.415 Surface 2,500 0.150 2 9-5/8" Intermediate 47/NT80/NSCC 8.681 Surface 10,021 0.0732 111 9-5/8" Intermediate 47/NT95HS/NSCC 8.681 10,021 11,790' 0.0732 3 7" Liner 29/SM-110/Btrs 6.184 11,549' 13,196' 0.0372 II 4-1/2" Liner 12.6/13CR-80/NSCT-TKC 3.958 11,356' 12,949' 0.0152 4 TUBING DETAIL 4-1/2" Tubing 12.6/13CR-80/Vam Top 3.958 Surface 11,370' 0.0152 5 WELL INCLINATION DETAIL Max Hole Angle=51 deg. @ 12,754' 6 JEWELRY DETAIL No Depth Item II 1 1,524' 4-1/2"HES XXO Nipple,ID=3.813-Control Cable Installed GLM Detail-MMG w/RK Latch(Sta.8 has RKP Latch) 8 2 3,834' ST8:Port=16,Dev.=15,VLV= DOME,TVD= 3,811',4/8/2013 'l NOTE: 3 5,485' ST 7:Port=20 Dev.=37,VLV=SO,TVD= 5,232',4/8/2013 MINIMUM ID= 4 6,853' ST 6:Port=0,Dev.=45,VLV=DMY,TVD= 6,213', 3/25/2013 9 3.725 @ 11,357' 5 7,716' ST 5:Port=0,Dev.=48,VLV=DMY,TVD 6,810',3/25/2013 iii 10 4-1/2 XN Nipple 6 8,581' ST 4:Port=0,Dev.=47,VLV=DMY,TVD= 7,398',3/25/2013 7 9,448' ST 3:Port=0,Dev.=45,VLV=DMY,TVD= 7,993',3/25/2013 11 8 10,357' ST 2:Port=0,Dev.=49,VLV=DMY,TVD= 8,625', 3/25/2013 . -r• 9 11,139' ST 1:Port=0,Dev.=47,VLV=DMY,TVD= 9,138',3/25/2013 1,,a 12 j 10 11,217' 4-1/2"HES X Nipple,ID=3.813" li.§ 11 11,251' 9-5/8"x 4-1/2"HES TNT Packer,ID=3.903" sii 12 11,281' 4-1/2"X Nipple,ID=3.813" -. 14 sa 13 . j'-,k 16&17 13 11,356' 9-5/8"x 7"Baker C-2 ZXP,ID=6.24" {,4,; 14 11,357 4-1/2"HES XN Nipple,ID=3.725" l -*'" 15 11,369' 4-1/2"Wireline Entry Guide,Bottom @ 11,370-TVD=9,298' s •C li 16 11,372' 9-5/8"x 7"HMC Liner Hanger,ID=6.210" 4% k} 17 11,378' 7"x 4-1/2"XO,ID=3.920" i , 18 11,549' 9-5/8"x 7"TIW Hydro Hanger '44,° 4 d,, 19 13,020' 3-3/8"BakerIBP(Tagged 7/8/2007) k ` '� PERFORATION DETAIL t; 7, END Sands Top(MD) Btm(MD) Top(ND) Btm(ND) FT Shot Date Current Size »T,. ,.. 118 12,300' 12,324' 9,966' 9,982' 24 8/7/07 Squeezed 2-7/8" a FV 12,314' 12,324' 9,975' 9,982' 10 5/15/93 Squeezed 2-1/8" ,i ''i , FE 12,305' 12,325' 9,969' 9,982' 20 5/7/13 Open 77/8" i 12,389' 12,422' 10,025' 10,046' 33 2/27/89 Squeezed 5" 95/8 FIV 17391' 12,411' 10,026' 10,039' 20 7/23/07 Squeezed 77/8" tir12,392' 12,422' 10,027' 10,046' 30 5/7/13 Open 2-7/8" i - 7"Marker Jt 12,400' 12,420' 10,032' 10,045' 20 2/26/89 Squeezed 5 a9 +r@12,110 12,484' 12,528' 10,087' 10,115' 44 2/27/89 Squeezed 5 12,485' 12,505' 10,088' 10,101' 20 5/6/13 Open 2-7/8 : FIll 12,495' 12,515' 10,094' 10,107' 20 2/26/89 Squeezed 5 tw�a q sa.wx 12,505' 12,530' 10,101' 10,117' 25 5/6/13 Open 2-7/8 7°' 12,578' 12,600' 10,148' 10,162' 22 2/27/89 Squeezed 5 e FII 12,580' 12,600' 10,149' 10,162' 20 5/6/13 Open 77/8 12,580' 12,600' 10,149' 10,162' 20 2/26/89 Squeezed 5 " r 5i t9 Ref Log:DLL-GR on 2/21/1989/Angle at the top perf=48 Deg.@ 12,350' Y, r N SAFETY NOTE GENERAL WELL INFO H2S Reading Average 230 to 260 PPM API:50-029-21905-00-00 TD=13,196'(MD)/TD=10,540'(TVD) on A/L&Gas Injections.Well requires Initial Completion by Doyon 15-3/2/1989 PBTD=12,905'(MD)/PBTD=10,356'(TVD) SSSV.4-1/2"Chrome Tubing.Casing RWO by Doyon 15-2/7/1997 Flange Rated to 3,000'psi. RWO by Doyon 14-3/31/2013 GLV C/O-4/8/2013 Revised By:TDF 2/17/2016 • H H . . Duck Island Unit Well: END 1-63 PROPOSED Last Completed: 3/28/2013 'favor!).Alaska.Lu : PTD: 189-006 TREE&WELLHEAD OPEN HOLE/CEMENT DETAIL Initial KB Elev.:55.25'/BF Elev.:16.5 Tree MCEVOY 4-1/16"Model'C' 13-3/8" 3,729 cu/ft Permafrost in 17.5"Hole Wellhead MCEVOY 13-5/8"x 4-1/2"DX2 Adapter 9-5/8" 575 cu/ft Class'G'in a 12-1/4"Hole t. 7" 331 cu/ft Class"G"in 8-1/2"Hole 30°alt.," CASING DETAIL [,, IA 1 Size Type Wt/Grade/Conn ID Top Btm BPF 133/8 30" Conductor N/A/N/A/N/A N/A Surface 107' N/A 13-3/8" Surface 68/NT80/CYHE 12.415 Surface 2,500 0.150 2 9-5/8" Intermediate 47/NT80/NSCC 8.681 Surface 10,021 0.0732 9-5/8" Intermediate 47/NT95HS/NSCC 8.681 10,021 11,790' 0.0732 3 7" Liner 29/SM-110/Btrs 6.184 11,549' 13,196' 0.0372 4-1/2" Liner 12.6/13CR-80/NSCT-TKC 3.958 11,356' 12,949' 0.0152 -11,z 4 TUBING DETAIL 4-1/2" Tubing 12.6/13CR-81 Top 3.958 Surface 11,370' 0.0152 f 5 WELL INCLINATION DETAIL Max Hole Angle=51 deg. @ 12,754' 6 JEWELRY DETAIL No Depth Item 7 1 1,524' 4-1/2"HES XXO Nipple,ID=3.813-Control Cable Installed GLM Detail-MMG w/RK Latch(Sta.8 has RKP Latch) 8 2 3,834' ST 8:Port=16,Dev.=15,VLV= DOME,TVD= 3,811',4/8/2013 NOTE: 3 5,485' ST 7:Port=20 Dev.=37,VLV=SO,TVD= 5,232',4/8/2013 I. MINIMUM ID= 4 6,853' ST 6:Port=0,Dev.=45,VLV=DMY,TVD= 6,213', 3/25/2013 9 3.725 @ 11,357 5 7,716' ST 5:Port=0,Dev.=48,VLV=DMY,TVD= 6,810',3/25/2013 " �` 110 4-1/2 XN Nipple 6 8,581' ST 4:Port=0,Dev.=47,VLV=DMY,TVD= 7,398',3/25/2013 t' i. . , 7 9,448' ST 3:Port=0,Dev.=45,VLV=DMY,TVD= 7,993',3/25/2013 t 8 10,357' ST 2:Port=0,Dev.=49,VLV=DMY,TVD= 8,625', 3/25/2013 s ! 11 9 11,139' ST 1:Port=0,Dev.=47,VLV=DMY,TVD= 9,138',3/25/2013 . 12 10 11,217' 4-1/2"HES XNipple,ID=3.813" 11 11,251' 9-5/8"x 4-1/2"HES TNT Packer,ID=3.903" V 12 11,281' 4-1/2"X Nipple,ID=3.813" moi; 111141 14 13 13 11,356' 9-5/8"x 7"Baker C-2 ZXP,ID=6.24" 16&17 1 14 11,357' 4-1/2"HES XN Nipple,ID=3.725" 15 11,369' 4-1/2"Wireline Entry Guide,Bottom @ 11,370"TVD=9,298' 16 11,372' 9-5/8"x 7"HMC Liner Hanger,ID=6.210" s • 17 11,378' 7"x 4-1/2"XO,I D=3.920" t, 18 11,549' 9-5/8"x7"TIW Hydro Hanger 19 13,020' 3-3/8"Baker IBP(Tagged 7/8/2007) PERFORATION DETAIL END Sands Top(MD) Btm(MD) Top(ND) Btm(ND) FT Shot Date ` Current Size " 18 12,300' 12,324' 9,966' 9,982' 24 8/7/07 Squeezed 2-7/8" k;: ° FV 12,314' 12,324' 9,975' 9,982' 10 5/15/93 Squeezed 2-1/8" It i 12,305' 12,325' 9,969' 9,982' 20 5/7/13 Open 2-7/8" `' 12,389' 12,422' 10,025' 10,046' 33 2/27/89 Squeezed 5" 9-5/8"A - FIV 12,391' 12,411' 10,026' 10,039' 20 7/23/07 Squeezed 2-7/8" 12,392' 12,422' 10,027' 10,046' 30 5/7/13 Open 2-7/8" 7"Marker lt 12,400' 12,420' 10,032' 10,045' 20 2/26/89 Squeezed 5 r@12,110 12,484' 12,528' 10,087' 10,115' 44 2/27/89 Squeezed 5 FIll 12,485' 12,505' 10,088' 10,101' 20 5/6/13 Open 2-7/8 12,495' 12,515' 10,094' 10,107' 20 2/26/89 Squeezed 5 12,505' 12,530' 10,101' 10,117' 25 5/6/13 Open 2-7/8 12,578' 12,600' 10,148' 10,162' 22 2/27/89 Squeezed 5 f', FII 12,580' 12,600' 10,149' 10,162' 20 5/6/13 Open 2-7/8 12,580' 12,600' 10,149' 10,162' 20 2/26/89 Squeezed 5 19 Fl ±12,684' ±12,704' ±10,216' ±10,228' 20 Future Future 2-7/8 ±12,708' ±12,728' ±10,231' ±10,244' 20 Future Future 2-7/8 7„ Ref Log:DLL-GR on 2/21/1989/Angle at the top perf=48 Deg.@ 12,350' TD=13,196'(MD)/TD=10,540'(1VD) SAFETY NOTE GENERAL WELL INFO PBTD=12,905'(MD)/PBTD=10,356'(TVD) H2S Reading Average 230 to 260 PPM API:50-029-21905-00-00 on A/L&Gas Injections.Well requires Initial Completion by Doyon 15-3/2/1989 SSSV.4-1/2"Chrome Tubing.Casing RWO by Doyon 15-2/7/1997 Revised By:TDF 2/17/2016 Flange Rated to 3,000'psi. RWO by Doyon 14-3/31/2013 GLV C/O-4/8/2013 • • • U __, 5/22/16-964-1-7. 3/1N•^:9 9/20/1986 :\\, -"N, �� 4/30/198791 . � � 1/27/1 2-46 - 2-62x15 1• 9/2/1995 7/31/1998 V 8/22/1988 -313A3 4/2/1': 4\11 r -3B 7/11/19:: 2-6$ 2/3/199 7/10/19: 9 1 ,1 �.. 1-59 • •,: .0 • 19,36 1-' \ 1. 1-2 1-65 11/13/1989 10/19/1988 9/16/1988 S A 1-677 4/2. 1993 ?y` 1/4/1995 1 1-43 1-15 1 2-40 --- i \ 1 1989 3/21/1993 / / % 1-4 1 v27ns8s HILCORP ALASKA LLC 1 3/14/1988 _."."^P,,.�.,a. -- 1 1!3 ALASKA NORTH SLOPE:ENDICOTT % �/ 1-'5 3/16/1988 %UPPER SUBZONE FI AOR MAP \ 4-0i POSTED WELL DATA — 5/7/1994 WELL-SPUD_D Well Number 3-19 WELL SYMBOLS 8/17/1989 • Active Oil f Shu In St 4-04 X PEA Oil Al Abandoned Injector Toarily Abandoned • INJempWeIIr(Water Flood) Shut n lnlector Water Shot In Injector Gas REMARKS Well symbol at top of UPSZ Fl Sand Red Dashed Circle=1,000ft radius from the proposed Fl perforations in END 1-63 Active/Open perfs in Black Proposed perfs in red 3/23/200• — 0 X00 2,1300 FEET 4-04A Febmary I,2016 7 i • Post Office Box 244027 Anchorage,AK 99524-4027 Hilcorp Alaska,LLC JUL 3 0 2615 3800 Centerpoint Drive Suite 100 CCC Anchorage,AK 99503 Phone: 907/777-8300 July 29, 2015 Fax: 907/777.-8301 Commissioner Cathy Foerster Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 1 ,,. (P3 Anchorage, AK 99501 Re: Duck Island Unit Well Renaming Request Dear Commissioner Foerster, Hilcorp Alaska, LLC (HAK) requests a change to the naming convention of Duck Island Unit wells to remove the unused suffixes at the end of each well name. Well names currently include a forward slash "I" followed by an obsolete bottom hole location designator. HAK would like to retain the well number as well as the "A, B, C...." sidetrack designations but remove the "/suffix". For example, "DUCK IS UNIT SDI 1-09A/L21" would become "DUCK IS UNIT SDI 1-09A". The attached spreadsheet includes original and new names for all Duck Island wells. While performing the review of Duck Island well names, HAK found a single well, "DUCK IS UNIT SDI 4-20/M35" (PTD# 1861730), that should also be modified to include an "A" label to reflect the fact that the well is a sidetrack from the original "DUCK IS UNIT SDI 4-20/T34" (PTD# 1861500). The original wellbore, abandoned 10/13/1986, was sidetracked to a new bottom hole location completed on 9/9/1987. This well appears to be one of the first sidetracks performed at Endicott. While the bottom hole code was changed, no letter was added to reflect the sidetrack. "DUCK IS UNIT SDI 4-20A" is also included on the attached spreadsheet. Sincerely, Wyatt Rivard Well Integrity Engineer Hilcorp Alaska, LLC CC Dave Roby Victoria Loepp Orig New API_WeliNo PermitNumber WellName WellNumber WellNumber 50029218010000 1880370 DUCK IS UNIT MPI 1-01/119 1-01 50029226010000 1951500 DUCK IS UNIT MPI 1-03/P16 1-03 50029216050000 1861060 DUCK IS UNIT MPI 1-05/020 1-05 50029217430000 1870810 DUCK IS UNIT MPI 1-09/J18 1-09 50029217430100 1970290 DUCK IS UNIT MPI 1-09A/L21 1-09A 50029221070000 1901570 DUCK IS UNIT MPI 1-11/SN4 1-11 50029223610000 1930560 DUCK IS UNIT MPI 1-15/P25 1-15 50029221000000 1901500 DUCK IS UNIT MPI 1-17/SN2 1-17 50029221000100 1961990 DUCK IS UNIT MPI 1-17A/117 1-17A 50029225690000 1950930 DUCK IS UNIT MPI 1-19/118 1-19 50029220050000 1900020 DUCK IS UNIT MPI 1-21/K25 1-21 50029225100000 1941280 DUCK IS UNIT MPI 1-23/015 1-23 50029217220000 1870420 DUCK IS UNIT MPI 1-25/N22 1-25 50029217220100 1970750 DUCK IS UNIT MPI 1-25A/K22 1-25A 50029216930000 1870090 DUCK IS UNIT MPI 1-27/P20 1-27 50029216690000 1861810 DUCK IS UNIT MPI 1-29/M25 1-29 50029225620000 1950720 DUCK IS UNIT MPI 1-31/M21 1-31 50029225770000 1951070 DUCK IS UNIT MPI 1-33/M23 1-33 50029225770100 1980870 DUCK IS UNIT MPI 1-33A/L24 1-33A 50029225770200 1982550 DUCK IS UNIT MPI 1-33B/L24 1-33B 50029225770300 2050040 DUCK IS UNIT MPI 1-33C/M24XX 1-33CXX 50029216720000 1861840 DUCK IS UNIT MPI 1-35/025 1-35 50029217480000 1870900 DUCK IS UNIT MPI 1-37/P24 1-37 50029218270000 1880630 DUCK IS UNIT MPI 1-39/P17 1-39 50029218270100 2061870 DUCK IS UNIT MPI 1-39A/N-16 1-39A 50029217130000 1870320 DUCK IS UNIT MPI 1-41/023 1-41 50029218640000 1881050 DUCK IS UNIT MPI 1-43/P26 1-43 50029219910000 1891240 DUCK IS UNIT MPI 1-45/026 1-45 50029216250000 1861310 DUCK IS UNIT MPI 1-47/Q21 1-47 50029216250100 1972030 DUCK IS UNIT MPI 1-47A/M20 1-47A 50029218410000 1880780 DUCK IS UNIT MPI 1-49/P21 1-49 50029223040000 1921190 DUCK IS UNIT MPI 1-51/V20 1-51 50029225010000 1941120 DUCK IS UNIT MPI 1-53/Q20 1-53 50029217880000 1880210 DUCK IS UNIT MPI 1-55/R25 1-55 50029218730000 1881140 DUCK IS UNIT MPI 1-57/R23 1-57 50029226440000 1960220 DUCK IS UNIT MPI 1-59/024 1-59 50029225200000 1941420 DUCK IS UNIT MPI 1-61/Q20 1-61 50029219050000 1890060 DUCK IS UNIT MPI 1-63/T22 1-63 50029226270000 1951880 DUCK IS UNIT MPI 1-65/N25 1-65 50029226270100 2032120 DUCK IS UNIT MPI 1-65A/N27 1-65A 50029219850000 1891140 DUCK IS UNIT MPI 1-67/T20 1-67 50029220200000 1900290 DUCK IS UNIT MPI 1-69/V19 1-69 50029215680000 1860630 DUCK IS UNIT MPI 2-02/P18 2-02 50029215850000 1860820 DUCK IS UNIT MPI 2-04/M19 2-04 50029216990000 1870180 DUCK IS UNIT MPI 2-06/J22 2-06 50029217710000 1880040 DUCK IS UNIT MPI 2-08/K16 2-08 50029223020000 1921170 DUCK IS UNIT MPI 2-12/016 2-12 50029216390000 1861490 DUCK IS UNIT MPI 2-14/016 2-14 50029218850000 1881340 DUCK IS UNIT MPI 2-16/M16 2-16 50029220320000 1900430 DUCK IS UNIT MPI 2-18/L16 2-18 50029220480000 1900600 DUCK IS UNIT MPI 2-20/L15 2-20 50029219310000 1890340 DUCK IS UNIT MPI 2-22/L14 2-22 COMMENTS: ❑ TO RE -SCAN Notes: Scanned by: Beverly Bren Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /q—de.5c File Number of Well History File PAGES TO DELETE Complete RESCAN ❑ Color items - Pages: ❑ Grayscale, halftones, pictures, graphs, charts - Pages: ❑ Poor Quality Original - Pages: ❑ Other - Pages: DIGITAL DATA ❑ Diskettes, No. ❑ Other, No/Type OVERSIZED ❑ Logs of various kinds ❑ Other Nathan Lowell Date: Re- Scanned by: Beverly Bren Vincent Nathan Lowell Date: /s/ 75 /s/ $ NOTScanned.wpd UNSCANNED, OVERSIZED MATERIALS AVAILABLE: 8�1 O FILE # ( 0,14 ,S 1_ 1 Vim' rA� To request any /all of the above information, please contact: Alaska Oil & Gas Conservation Commission 1333 W. 7th Ave., Ste. 100 Anchorage, Alaska 99501 Voice (907) 279 -1433 Fax (907) 276 -7542 1. Operations Performed: • Abandon _∎ Repair Well 0 Plug Perforations 0 Perforate • Re -Enter Suspended Well 0 Alter Casing ■■ Pull Tubing • Stimulate - Frac • Waiver • Other • Change Approved Program • Operation Shutdown • Stimulate - Other • Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. . 4. Well Class Before Work: • Exploratory • Stratigraphic Development' • Service 5. Permit To Drill Number: 189 - 006 • 3. Address: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 6. API Numbe 50 029 - 21905 - 00 - 00 . 7. Property Designation (Lease Number): ADL 034633 & 034636 8. Well Name and Number: 1 63/T - 22 • 9. Logs (list logs and submit electronic and printed data per 20AAC25.071): 10. Field / Pool(s): Endicott Field / Endicott Pool . 11. Present well condition summary: Total depth: measured 13196' feet • Plugs:(measured) 13020' feet true vertical 10540' feet Junk: (measured) None feet Effective depth: measured 12905' feet Packer: (measured) 11251' feet true vertical 10356' feet Packer: (true vertical) 9215' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 71' 30" 39' - 110' 39' - 110' Surface 2461' 13 -3/8" 39' - 2500' 39' - 2490' 5020 2270 Intermediate 11751' 9 -5/8" 39' - 11790' 39' - 9603' 6870 4760 Production Liner 1647' 7" 11549' - 13196' 9427' - 10540' 11220 8510 Scab Liner 1593' 4 -1/2" 11356' - 12949' 9288' - 10384' 8430 7500 SCANN JUN 0 4 Z 3. Perforation Depth: Measured Depth: 12305' - 12600' feet a — " True Vertical Depth: 9969' - 10162' feet Tubing (size, grade, measured and true vertical depth): 4 - 1/2 ", 12.6# 13Cr85 11370' 9298' Packers and SSSV (type, measured and true vertical depth): 9 - 5/8" x 4 - 1/2" HES TNT Packer 11251' 9215' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: Cut and Pull 4 -1/2" Tubing at 11481', Mill, Clean, and Fish to 12950', Run 4 -1/2 ", 12.6#, L- 80/13Cr80 Scab Liner from 11356' to 12949', Cement Scab Liner w/ 62 Bbls (298 sx) Class 'G', Run 4 -1/2 ", 12.6#, 13Cr85 Tubing to 11370', Perforate Post -Rig from 12305' to 12600'. 13 Representative Dai y Average Production or Injection Data Prior to well operation: Subsequent to operation: Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure 106 2577 1688 1350 294 152 2822 1683 1400 254 14. Attachments: 0 Copies of Logs and Surveys run 0 Daily Report of Well Operations 0 Well Schematic Diagram 15. Well Class after work: • • Exploratory ■ Stratigraphic 0 Development • Service 16. Well Status after work: 0 Oil ' • Gas • WDSPL • GSTOR • WINJ • WAG • GINJ • SUSP • SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Sean McLaughlin, 564-4387 Sean.McLaughlin @bp.com Sundry Number or N/A if C.O. Exempt: 313 - 019 Email: Printed N Joe La ufka Title: Drilling Technologist Signature A �� Phone: 564 -4091 Date: 5/2-5// Form 10-404 R Red 10)201 STATE OF ALASKA SA SKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS RECEIVED MAY 2 3 2013 CC 3) I) 3 �31$DMS MAY 2 8 201M it O riginal Only • • END 1 -63, Well History (Pre Rig Workover) Date Summary 02/10/13 PULLED 4 -1/2" PX PLUG FROM X -NIP @ 11520' SLM/ 11550' MD. SET 4 -1/2" PX PLUG IN X -NIP @ 11520' SLM/ 11550' MD. RAN CHECK SET TO CONFIRM GOOD SET ON PLUG BODY. LRS ATTEMPTED MIT -T, PUMPED 2 BBLS METH & 58 BBLS DIESEL DOWN TBG, WELL WENT ON VAC. PULL PX PLUG AND PRONG FROM 11520' SLM/11550' MD. 02/10/13 MIT -T to 2500 psi in progress. Assist Slickline (RWO Expense) Pumped 15 bbls 10* diesel down TBG to test plug set. TBG went on vac. SL to pull & re -set plug. / Pumped 2 bbls meth followed by 58 bbls 60* DSL down TBG in attempt to test plug. TBG went on vac. SL to pull & re -set plug. 02/11/13 Assist Slickline (RWO Expense) Pumped 9 bbls of DSL down TBG to assist SL setting plug. Pumped 55 bbls DSL down TBG to attempt to catch pressure. Established LLR of 5 bpm on Vac. Pumped 98 bbls DSL for LDL. 02/11/13 SET 4 -1/2" PXN PLUG @ 11541' SLM/ 11571' MD. LRS ATTEMPTED MIT -T, PUMPED 45 BBLS DIESEL DOWN TBG, WELL WENT ON STRONGER VAC. RAN SLB LDL PER PROGRAM FROM 11522' SLM TO 11050' SLM. 02/12/13 PULLED P PRONG FROM 11,534' SLM. PULL PX PLUG BODY FROM 11,541' SLM/ 11,550' MD. 02/12/13 Assist Slickline. MIT -OA to 2000 psi ** *FAIL *** (RWO Expense) MIT -OA to 2000 psi Pumped 3.8 bbls of 0* DSI down OA to perform 4 MIT -OA tests. All failed. 4 th MIT -OA took .1 bbls to pressure up to 2013 psi. 15 mins IA gained 3 psi / OA lost 32 psi. 30 mins IA gained 1 psi / OA lost 31 psi. Total Test IA gained 4 psi /OA lost 63 psi. FAIL. Bled back OA pressure to 16 psi. FWHP's= vac/343/16 SV,SSV,WV =C MV =O CV's =OTG. 02/15/13 T /I /O =SSV /60/70. Temp =SI. T & IA FL (Slickline request). Well is disconnected from system. Well house removed. Unable to get T FL @ this time. IA FL @ surface. SV, WV, SSV =C. MV =O. IA &OA =OTG. NOVP. 2053. 02/17/13 T /I /0 =0 +/60/70. Temp =SI. T FL (E -line request). T FL near surface. SV, WV =C. SSV, MV =O. IA &OA =OTG. NOVP. 0355. 02/17/13 INITIAL T /I /O = VAC /350/0 PSI. SET WEATHERFORD 4 -1/2" CIBP MID ELEMENT SET AT 11485.5' - PLUG LENGTH = 1.1' TOP OF PLUG = 11485'. CORRELATED TO TT DATED02/06/1996 - CCL TO ME = 7'. LAYED DOWN EQUIPMENT ON LOCATION AND WILL CONTINUE WITH JET CUT TOMORROW. FINAL T /I /O = VAC /350/0 PSI. 02/17/13 T /I /O= - 6/347/20 Temp= SI Assist SEL MITxT to 2500 psi PASSED (Obj: Pre -RWO) Pumped 12.3 bbls of 40 *f to catch pressure up to 300 psi. then shut down to monitor for 5 min prior to bringing up to full test pressure. (Tbg was on a vac) Pumped addiotional 2.7 bbls of 40* diesel down Tbg to reach test pressure of 2500 psi. Tbg lost 69 psi @ 15 min and lost 17 psi @ 30 min for a total 86 psi in test. Bled back 2 bbls of fluid. SSV, AWV, SV, DBV in kill line at WH = closed (IN THAT ORDER) MV, IA, OA= open Kill line DBV on ground= closed Tags hung. DSO notified at departure. Permit returned to SEL engineer cab. FWHP= 500/340/10. 02/18/13 INITIAL T /I /O = 100/350/0 PSI. CORRELATED TO TT DATED02/06/1996 - CCL TO CUTTER = 24.3; CUT DEPTH = 11480.5', CCL STOP DEPTH = 11456.2'. PRESSURE UP TUBING PRIOR TO CUT - T /1 /O PRIOR = 800/350/0 PSI, AFTER CUT = 450/370/0 PSI. TUBING CUT AT 11480.5'. FINAL T /I /O = 450/370/0 PSI. WELL SI UPON DEPARTURE. 02/20/13 T /I /O= 441/346/40 Temp= SI Rigged up to Kill line and pumped 23 bbls of -20 *f meth down Tbg to CMITTxIA. SD ran out of fluid, ordered up some more. Page 1 of 3 i END 1 -63, Well History (Pre Rig Workover) Date Summary 02/21/13 CMIT -TxIA to 1000 psi PASSED - -5th attempt -- (Pre -RWO) Post SEL jet -cut. Pumped 29 bbls of 50 *f diesel (23 bbls meth prior to Midnight) down Tbg to reach test pressure. TxIA gained 2/2 psi in 1st 15 mins and 1/1 psi in 2nd 15 mins for a total gain of 3/3 psi in 30 min test. Final WHPs 500/420/0 SV,WV,SSV= Shut MV =Open. 03/02/13 T /I /O= 551/507/0 Temp =S /I Circ -Out (Pre- Rig Work Over) Pumped a 5 bbl meth spear followed by 1080 bbls of 120 *F seawater down the tubing taking returns up the IA to surface tanks. Pumped 5 bbls met and 35 bbls of warm diesel freeze protect down tubing. U -Tube TxIA to freeze protect. SV, WV= C SSV= Turned over to DSO (Frozen) MV= 0 IA, OA= OTG FWHP's= 65/65/270 psi. 03/04/13 T /I /0 = SSV /60/0 +. Temp = SI. Samples TBG,IA (Pre RWO) Unable to get TBG sample (Frozen), IA sample turned over to END OPS. SV, WV, SSV = C. MV = 0. IA, OA = OTG. 1100. 03/04/13 T /I /O= xxx/26 /31 Temp =S /I Re- freeze protect TBG & IA & surface lines (Post -circ) Pump 6 bbls MEOH thru surface lines to both tanks for FP. Pump 10 bbls MEOH followed by 70 bbls 100* diesel down IA taking returns up TBG thru surface lines to surface tank then line up to TBG & pump 5 bbls MEOH followed by 16 bbls 100* diesel down TBG taking returns up IA to surface tank. S/I well @ TBG & IA & line up to surface lines & pump 5 bbls MEOH down lines to both tanks to FP surface lines. Open well & U- tube TBG & IA for 1 hour to place FP. FWHP's= xxx/xxx/xxx Upon departure DSO notified of SWV,SSV's,IAV to hardline & TBG jumper =S /I Idy\4A,OA =OTG. 03/05/13 T /I /0= 2/26/31 Temp =S /I Re- freeze protect TBG & IA & surface lines (Post -circ) Pump 6 bbls MEOH thru surface lines to both tanks for FP. Pump 10 bbls MEOH followed by 70 bbls 100* diesel down IA taking returns up TBG thru surface lines to surface tank then line up to TBG & pump 5 bbls MEOH followed by 16 bbls 100* diesel down TBG taking returns up IA to surface tank. S/I well @ TBG & IA & line up to surface lines & pump 5 bbls MEOH down lines to both tanks to FP surface lines. Open well & U -tube TBG & IA for 1 hour to place FP. FWHP's= 0/20/0 Upon departure DSO notified of SWV,SSV's,IAV to hardline & TBG jumper =S /I IAV= OTG,OA =OTG. 03/05/13 T /I /0= SSV /0/0 Temp= SI PPPOT-IC (PASS) Energize secondary seals Pre RWO. PPPOT-IC: DHD bled IAP and OAP to 0 psi. and held open bleeds. Bled test void to 0 psi. with SBS. RU elephant gun on packing port. Energize secondary seals. Remove 1" NPT from test port and install alamite fitting. pump through void, good returns. Pressured test void to 3000 psi. for 30 min. test. Lost 0 psi. in 30 min. (PASS). Bled void to 0 psi. Removed internal check, reinstalled alamite fitting pressured test void to 3000 psi. no leaks on alamite threads. Bled void to 0 psi. 03/05/13 T /I /0 = SSV/48/32. Temp =SI. Assist Cameron w/ PPPOT -IC. No AL, WH, or FL. IA & OA FLs @ surface. Bled OAP to 0 psi in 5 min, fluid. Bled IAP to 0 psi in 5 min. Held open bleed, to bucket, on IA & OA for T seal re- energizing , then swapped to BT for duration of PPPOT -IC for a total of 7 gal of fluid returned. IAP =4 psi, OAP =4 psi. SI bleed. Monitor for 30 min. IAP & OAP unchanged. Job complete. Final WHPs = SSV /4/4. SV= Unreachable. WV,SSV= Closed. MV =Open. IA,OA =OTG. NOVP. (1630 hrs). 03/06/13 T /I /0= 0 +/4/6. Temp= SI. Bleed WHPs to 0 psi (Pre RWO). No AL, FL or WH. Hardline circ -out rigged to Tbg & IA. Tbg, IA & OA FL @ surface. Bled TP to 0 psi in <1 min through hardline. Bled IA to 0 psi in <1 min through hardline & held open for 5 mins. Blew down hardline w/ gas. Monitored for 1.5 hrs (hardline rig- down). IAP increased 1 psi. Bled IA to 0 psi to bonded bucket ( -1/2 pint fluid). Bled OA from 6 psi to 0 psi ( -1/2 gal) to bonded bucket in 2 mins. TP on vac. Bled IA to bonded bucket ( -2 gals fluid) with Tbg open to atmosphere. Tbg & IA balanced in !10 mins. Monitored for 30 mins. WHPs unchanged. Job complete. Final WHPs= 0/0/0. Page 2 of 3 • END 1 -63, Well History (Pre Rig Workover) Date Summary 03/07/13 T /I /O = TWCNAC /3. Temp = SI. Bleed IAP & OAP to 0 psi. (Pre RWO). IA & OA FL @ surface. Bled OAP from 3 psi to 0 psi in < 1 minute. (1 quart fluid). Held open bleed on IA and OA for 3 hours while Cameron changed out LDS. Monitored for 30 minutes. TP, IAP, and OAP unchanged. Job Complete. Final WHPs = TWC /0/0. SV, MV = C. No SSV or WV. IA, OA = OTG. NOVP. 1300 hrs. 03/07/13 T /I /O= 0/0/0 Temp= SI Remove and replace Seized LDS Pre RWO. DHD bled WHP's to 0 psi. and held open bleeds. Stung into test void (0+ psi.). Bled void to 0 psi. Freed up and removed stuck LDS. Replaced with new LDS assembly. Pressured test void to 3000 psi. No leaks. Bled void to 0 psi. 03/07/13 T /I /O= 0/0/0 Conduct PJSM w /crew; Start barrier list; Barriers= SSV & MV; Installed lubricator & P.T. (charted) to 300 psi /3500 psi (passed); Set 4" CIW "H" TWC #286 @ 106" w/1 -2' ext.; P.T. topside of TWC & MV independently to 500 psi (passed); Removed upper tree & installed SV & torqued to spec.(Dryhole Tree); P.T. (charted) TWC & flange connection to 300 psi /4000 psi (passed); Pre Doyon 14. 03/09/13 T /I /O= 0/0/0 Conduct PJSM w /crew; Start barrier list; Barriers= VR Plug (OA) & IA valve for IA; Installed 2- 1/16" FMC 120 on backside of OA, P.T. (charted) to 300 psi /3500 psi (passed); Pulled 2' VR Plug; Installed second IA (piggy back) on backside IA valve, P.T. (charted) to 300 psi /3500 psi (passed); All flanges torqued to API spec.; Pre Doyon 14. 03/11/13 T /I /O= SI /0/0 Conducted PJSM w /crew; Start Barrier list; Barriers= VR plug & Gate valve; Installed VR Lubricator & P.T. (charted) to 300 psi /3500 psi (passed); Set 2" FMC VR plug; Tested (charted) plug to 300 psi /3500 psi (passed); Installed new 2" FMC 120 gate valve on front side O/A (Torqued to spec.) rolled it up 1 bolt hole per Doyon 14; P.T. (charted) connection to 300 psi /3500 psi (passed); pulled VR plug; Pre Doyon 14. 03/12/13 T /I /O= SI /0/0 Conducted PJSM w /crew; Start Barrier list; Barriers= VR plug & Gate valve; Installed VR Lubricator on backside O/A & P.T. (charted) to 300 psi /3500 psi (passed); Set 2" FMC VR plug O /A; Tested (charted) plug to 300 psi /3500 psi (passed); Rolled O/A 1 bolt hole per Doyon 14, torqued to API spec.; P.T. (charted) connection to 300 psi /3500 psi (passed); pulled VR plug; Pre Doyon 14. Page 3 of 3 s • • North America - ALASKA - B Operation Sum - : Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4 -00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00 Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/13/2013 14:30 - 15:30 1.00 MOB P PRE PREP FOR RIG MOVE. -SKID RIG FLOOR INTO MOVING POSITION. * NOTICE TO WITNESS BOP TEST SENT TO AOGCC @ 18:45 3 -13-13 FOR TEST TO BE CONDUCTED AT 19:00 3- 14 -13 *. -`,JOHN CRISP WAIVED WITNESS RIGHTS TO BOP TEST VIA EMAIL 19:18 3-13 -2013* 15:30 - 16:00 0.50 MOB P PRE ` P4SM, MOVE OFF WELL. -MOVE RIG OFF END 3-19. 16:00 - 18:00 2.00 MOB P PRE MOVE RIG. -ROLL RIG 70 FIRST INTERSECTION. 18:00 - 20:30 2.50 MOB P PRE MOVE RIG. -MOVE FROM FIRST INTERSECTION TO DIU -MPI. 20:30 - 21:30 1.00 MOB P PRE SPOT Rae. - CONTACTED PAD OPERATOR, WITNESSED RIG SPOTTING. ' - SPOTTED RIG OVER WELL END 1-63. 21:30 - 22:30 1.00 MOB _ P PRE ._ LEVEL RIG. -SHIM REAR OF RIG. 22:30 - 23:00 0.50 MOB - `'- PRE ° -PJSM - REVIEWED RIG FLOOR SKID PROCEDURE. 23:00 - 00:00 1.90 MOB P PRE SKID RIG FLOOR. -SKID RIG FLOOR INTO DRILL POSITION. -SET RIG MATS, LAY HERCULITE FOR ROCK WASHER. 3/14/2013 00:00 - 06:00 6.00 RIGU P - _ PRE RIG UP -SPOT ROCK WASHER AND BERM AROUND ROCKWASHER -RIG UP RIG FLOOR -SPOT ROCKWASHER AND FUEL TRAILER - EXTENDED CONVEYOR TO ROCK WASHER -DEMOB RIG EQUIPMENT FROM END 3 -19 CONT. -SET UP LOCATION. * *RIG ACCEPTED AT 04:00 AM, 3- 16 -13 ** 06:00 - 12:00 6.00 RIGU P PRE RIG UP CONT. - CONDUCTED ATP MEETING. -RIG CREW WORK ON HOUSE KEEPING. - INSPECT PITS VALVE HANDLES AND RUBBER SEALS FOR WEAR. - ELECTRICIAN HOOK UP TOP DRIVE. - MECHANIC PERFORM MP LEVEL 2 (MAINTENANCE PREVENTION) ON TOP DRIVE 12:00 - 13:00 1.00 RIGU P PRE RIG UP CONT. -RIG CREW WORK ON HOUSE KEEPING. - DOUBLE CHECK WORK AREA'S, POST RIG MOVE INSPECTION. -TAKE ON 580 BBLS OF 120 DEGREE 8.8 PPG BRINE. 13:00 - 13:30 0.50 RIGU P PRE WELL BORE PRESSURES VERIFIED. - TUBING PRESSURE= 0 PSI. -INTER ANNULUS PRESSURE= 0 PSI. -OUTER ANNULUS PRESSURE= 0 PSI. Printed 5/20/2013 10:03:49AM • • "J-46A1,„ America - ALASKA - BP ' ;AM' YAM A ''''AAA /102Ai:AN?.:f'044,AackW12,44;1figrai;4741 1 Operation Summary Report Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4 -00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901 "W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 15:30 2.00 RIGU P PRE PJSM, WORKING ON TREE. - INSTALL SECOND ANNULUS VALVE ON OUTER ANNULUS. - MOBILIZE TOOLS FOR UP COMING CELLAR OPERATIONS. 15:30 - 16:30 1.00 RIGU P PRE H2S RIG EVACUATION DRILL. "- EVACUATED THE RIG, 4:10 TIME RESPONSE TIME, ALL PERSONNEL ACCOUNTED FOR. -RIG PERSONNEL TEST RIG EMERGENCY SHUT DOWN SYSTEM, TEST GAS ALARMS, TEST GOOD. - NOTIFY PAD OPERATOR OF EVACUATION DRILL -EVACUATION TO PRIMARY MUSTER AREA (BLAST SHACK) - - FORKLIFT BLOCKED OFF ENTRANCE TO PAD HELD AAR WITH RIG CREWAFTER DRILL 16:30 - 17:00 0.50 RIGU P PRE PJSM, WORKING ON TREE. , '- -CONDUCTED MEETING WITH CAMERON -- PERSONNEL ON WORKING IN CELLAR. 17:00 - 18:30 1.50 RIGU P " PRE - __..NIPPLE DOWN TREE. _ R OFF CONTROL LINES. _ -BLED OFF HANGER VOID. -BROKE FLANGES, PICKED TREE UP - CRIMPED CONTROL LINES, CUT CONTROL LINES. -STOOD TREE BACK IN CELLAR, SECURED TREE. - INSTALL PLUGS ON CONTROL LINES. - PRESSURE TEST HARD LINES TO SLOP TANK, 250 PSI LOW/ 3500 PSI HIGH FOR 5 MINUTES. 18:30 - 23:00 4.50 BOPSUR P PRE NIPPLE UP BOP STACK. -PICK UP ADAPTER FLANGE, SET. -PICK UP BOP STACK SET. - NIPPLE UP STACK. - SECURE TURN BUCKLES. - INSTALL PITCHER NIPPLE AND FLOW LINE. 23:00 - 00:00 1.00 BOPSUR P PRE RIG DOWN SAFETY JOINT. -BREAK OFF CROSS OVERS ON SAFETY JOINT. - DERRICK INSPECTION. 3/15/2013 00:00 - 01:00 1.00 BOPSUR P PRE MAKE UP SAFETY JOINT. -CONT. MAKING UP SAFETY JOINT WITH CROSS OVERS. - DERRICK INSPECTION CONT. 01:00 - 02:30 1.50 BOPSUR P PRE BOP EQUIPMENT TEST. -MAKE UP CROSS OVER ON 4" TEST JOINT AND HEAD PIN. -BOP DRILL, TOOK 6 BBLS TO FILL GAS BUSTER. -DRAIN GAS BUSTER . Printed 5/20/2013 10:03:49AM s • ° North America - ALA ‹ r� r Operation Summary Re r Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4 -00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.O0usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 03:30 1.00 BOPSUR P PRE BOP EQUIPMENT TEST -TEST BOP EQUIPMENT AS PER STATE OF ALASKA REQUIREMENTS AND DOYON PROCEDURES. -3 1/2" X 6" VARIABLE BORE RAMS ON UPPER AND LOWER PIPE RAMS -TEST BOP WITH 4" AND 4 1/2" TEST JOINTS. -TEST TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 CHARTED MINUTES EACH. 03:30 - 04:00 0.50 BOPSUR P PRE EVAC DRILL - CONDUCTED EVAC DRILL WITH CREW ON BOARD -ALL PERSONNELACCOUNTED FOR -NOTIFY PAD OPERATOR OF EVACUATION DRILL - EVACUATION TO PRIMARY MUSTER AREA (BLAST SHACK) -CREW RESPONSE TIME -05:00 MINUTES - FORKLIFT BLOCKED OFF ENTRANCE TO PAD HELD AAR WITH RIG CREWAFTER DRILL 04:00 - 09:30 5.50 BOPSUR P PRE BOP EQUIPMENT TEST CONT. -TEST BOP EQUIPMENT AS PER STATE OF ALASKA REQUIREMENTS AND DOYON PROCEDURES. -TEST BOP WITH 4" AND 4 1/2" TEST JOINTS. -TEST TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 CHARTED MINUTES EACH. - PERFORMED KOOMEY DRAW-DOWN TEST AS PER DOYON PROCEDURES 09:30 - 12:00 2.50 BOPSUR P -. PRE PULL TWO WAY CHECK. -RIG UP DUTCH RISER AND LUBRICATOR. - PRESSURE TEST TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 CHARTED MINUTES. -OUTER ANNULUS PRESSURE = O PSI 12:00 - 13:00 1.00 WHSUR P DECOMP PULL TWO CHECK CONT. -PULL TWO WAY CHECK. - FLOW CHECK, CONFIRMED THE WELL IS DEAD. -LAY DOWN LUBRICATOR AND EXTENSIONS. -LAY DOWN DUTCH RISER. 13:00 - 13:30 0.50 PULL P DECOMP CHANGE OUT BAILS. - REMOVE SHORT BAILS, INSTALL LONG BAILS ON TOP DRIVE. - VACUUM FLUIDS FROM BOP STACK 13:30 - 15:30 2.00 PULL P DECOMP RIG UP TO CIRCULATE. - RIG UP TO CIRCULATE OUT FREEZE PROTECT FROM 4.5 TUBING AND INNER ANNULUS TO OPEN TOP TANK 15:30 - 17:30 2.00 CLEAN P DECOMP TEST HARD LINES. -PJSM, TESTING HARD LINES WITH DIESEL. -TEST 250 PSI. LOW/ 3500 PSI. HIGH FOR 5 CHARTED MINUTES. 17:30 - 19:00 1.50 CLEAN P DECOMP CIRCULATE OUT FREEZE PROTECT. -PJSM, CIRC. OUT FREEZE PROTECT FROM TUBING AND IA. -TAKE RETURNS TO OPEN TOP TANK -CIRC 26 BBLS OF 8.8 BRINE DOWN IA @ 5 BPM (50 SPM), 210 GPM WITH 650 PSI. -LINE UP AND PUMP 111 BBLS OF 8.8 PPG BRINE DOWN THE TUBING @ 5 BPM (50 SPM), 210 GPM WITH 210 PSI. Printed 5/20/2013 10:03:49AM • • � ,%/ o j ii o h o/ , / North Amer - '� i ii // Operation Summary Report Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4 -00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. , UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table ©58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 20:00 1.00 CLEAN P DECOMP 1U-TUBE FOR 60 MINUTES. -BLOW DOWN LINES TO OPEN TOP TANK -LINE UP TO LET 8.8 PPG BRINE U -TUBE FOR 60 MINUTES. - SIM -OPS: PJSM WITH CAMERON, PREP WELL HEAD TO PULL HANGER. 20:00 - 21:00 1.00 CLEAN P DECOMP FLOW CHECK. -FLOW CHECK WELL FOR 10 MINUTES, WELL STATIC. -PJSM, RIG DOWN AND BLOW DOWN LINES. -RIG DOWN , BLOW DOWN. _ 21:00 - 21:30 0.50 PULL P DECOMP I BACK OUT LOCK DOWN SCREWS. 1-CAMERON REP. BACK OUT LOCK DOWN 1 SCREWS. -OUTER ANNULUS PRESSURE = 0 PSI _ 21:30 - 22:00 0.50 PULL P DECOMP PJSM, PULLING HANGER. -PULL TUBING HANGER TO RIG FLOOR. - HANGER BROKE FREE @ 165K, FINAL PULL WEIGHT= 170K. 22:00 - 22:30 0.50 PULL P DECOMP SLB REP. CUT CONTROL LINE ON HANGER. -PULL HANGER UP 30', CUT TUBING AND RE BAND. -DRAIN AND DISPOSE OF CONTROL LINE. 1 -RUN IN HOLE WITH HANGER AND TUBING, SET HANGER BELOW ROTARY TABLE, ABOVE FLOW LINE. - _ -SLACK OFF WEIGHT= 144K. 22:30 - 00:00 1.50 PULL.: P DECOMP PJSM, DISPLACING FLUIDS. _ - DISPLACE OUT 8.5 PPG SEAWATER WITH 8.8 PPG BRINE. -PUMP 40 BBLS 8.8 PPG BRINE (WITH 1 BBL OF SAFE SURF 0) SWEEP, FOLLOWED BY 8.8 PPG BRINE. - CIRCULATING RETURNS THRU THE CHOKE TO GAS BUSTER, TAKING RETURNS TO ROCKWASHER. - CIRCULATE 6 8PM (60 SPM) WITH 300 PSI. _OUTER ANNULUS PRESSURE = 0 PSI 3/16/2013 00:00 - 02:00 2.00 PULL P DECOMP PJSM, DISPLACING FLUIDS, CONTINUED - DISPLACE OUT 8.5 PPG SEAWATER WITH 8.8 PPG BRINE. - CIRCULATE RETURNS THRU THE CHOKE TO GAS BUSTER, TAKE RETURNS TO ROCKWASHER. - CIRCULATE 6 BPM (60 SPM) WITH 300 PSI. (800 BBLS TOTAL BRINE PUMPED (8000 STROKES). -NO GAS OBSERVED DURING CIRCULATION Printed 5/20/2013 10:03:49AM • • North America - ALASKA - BP �� % ''�� ��� ���� Operation Summary Report Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) I Start Date: 3/13/2013 End Date: 3/31/2013 X4 OOXSP -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 03:00 1.00 PULL I P DECOMP ' FLOW CHECK. - FLOW CHECK WELL FOR 10 MINUTES, WELL STATIC. -OPEN ANNULAR PREVENTOR. -SLOW PUMP RATES -BLOW DOWN LINES. -RIG UP CASING EQUIPMENT -RIG UP SCHLUMBERGER TUBING SPOOLER SPR @ 11481' MUD WEIGHT= 8.8 PPG PUMP #1- 20 SPM= 30 PSI, 30 SPM= 70 PSI. PUMP #2- 20 SPM= 30 PSI, 30 SPM= 70 PSI. 03:00 - 03:30 0.50 PULL P DECOMP PJSM, PREP SAFETY JOINT -PULL HANGER TO ABOVE RIG FLOOR - BREAK OUT HANGER AND LANDING JOINT FROM STRING -BREAK OUT HANGER FROM LANDING JOINT -BREAK APART CROSSOVERS FROM LANDING JOINT -PREP LANDING JOINT FOR SAFETY JOINT WITH CROSSOVERS AND FOSV AND STAGE IN PIPE SHED 03:30 - 06:00 2.50 PULL P DECOMP PULL COMPLETION TUBING - PULL4.5" 12.6# 13CR NSCT TUBING -USE AIR CHISEL TO BREAK SS BANDS HOLDING SS CONTROL LINES ON TUBING -SPOOL CONTROL LINES ON SPOOLER WITH SCHLUMBERGER I- REMOVE CONTROL LINES AT HXO SVLN ASSEMBLY AT 1536'. -LAY DOWN CONTROL LINE SPOOLER AND TOOLS. - RECOVERED 21 BANDS FROM THE TUBING AND CONTROL LINES -TESTED CONTROL LINES FOR NORM- TESTED OK 06:00 - 12:00 6.00 PULL P DECOMP PULL COMPLETION TUBING, CONTINUED -PULL 4.5" 12.6# 13CR NSCT TUBING FROM 1536' -OUTER ANNULUS PRESSURE = 100 PSI 12:00 - 15:00 3.00 PULL P DECOMP PULL COMPLETION TUBING, CONTINUED -PULL 4.5" 12.6# 13CR NSCT TUBING FROM JOINT # 220 TO # 280. - CUT JOINT= 3.38' OF 9.63' PUP JOINT. TUBING STUB LOOKING UP IN HOLE IS 6.25' ABOVE PACKER -FLARE OUT OD ON CUT JOINT= 4.7/8" -TOTAL OF 282 TUBING JOINTS RECOVERED PLUS ASSOCIATED JEWELRY 15:00 - 18:00 3.00 PULL P DECOMP MOBILIZE DRESS OFF BHA. -FLOW CHECK WELL FOR 10 MINUTES, WELL STATIC. -PJSM, LAY DOWN TUBING TOOLS AND EQUIPMENT. - MOBILIZE TUBING STUMP DRESS OFF BHA TOOLS TO RIG FLOOR. I- CHANGE OUT LONG BAILS TO SHORT BAILS. Printed 5/20/2013 10:03:49AM • 4110 110 North America - ALASKA B Operation Summary Repoq Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4 -00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name/No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat 070 °21'07.268 "8 Long: 0147°57'25.901 "W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 18:30 0.50 PULL P DECOMP INSTALL WEAR BUSHING. -RUN IN HOLE AND SET WEAR BUSHING. (ID= 12.25 ") -RUN IN 4 LOCK DOWN SCREWS, SECURE BUSHING. 18:30 - 19:00 0.50 PULL P DECOMP PJSM, MAKE UP BHA. - -PJSM, MAKE UP DRESS OFF ASSEMBLY BHA #1. 19:00 - 22:30 3.50 PULL N RREP DECOMP 'OBSERVED OIL LEAK ON TOP DRIVE -LAY DRESS OFF ASSEMBLY BHA IN PIPE SHED. -TAKE OFF SHORT BAILS. -CLEAN UP TORQUE TUBE. REMOVED SHOCK COLLAR AND SPLIT RING FROM QUILL FOR INSPECTION OF SEALS. - MECHANIC INSPECT TOP DRIVE ROTATING ASSEMBLY. 22:30 - 23:30 1.00 PULL N RREP DECOMP REASSEMBLE •TOP DRIVE, TEST. -PUNT SHORT BACK ON TOP DRIVE. -TIE WIRE SHOCK COLLAR. - INSPECT TOP DRIVE GEAR BOX SEAL FOR LEAKS. 23:30 - 00:00 0.50 _ PULL P DECOMP RiG UP TO HANDLE DRESS OFF BHA. -PREP FOR UPCOMING OPERATION, PICKING UP BHA #1 -CLEAR RIG FLOOR OF ALL TOOLS -OUTER ANNULUS PRESSURE @ 23:00 = 110 PSI. 3/17/2013 00:00 - 00:30 0.50 FISH ; P DECOMP PJSM, PICKUP DRESS OFF BH #1. -PICK UP DRESS OFF ASSEMBLY FROM PIPE SHED (8 3/8" X 4 1/2" DRESS OFF TOOL. 00:30 - 01:00 0.50 FISH P DECOMP RIG SERVICE. - LUBRICATE RIG. 01:00 - 02:00 1.00 FISH P DECOMP MAKEUP DRESS OFF BHA. -PICK UP AND RUN IN HOLE WITH DRILL COLLARS AND CROSSOVER SUBS. -FIRE DRILL= 1:45 RESPONSE. 02:00 - 12:00 10.00 FISH P DECOMP RUN IN HOLE. -RIH ON 4" DRILL PIPE, PICKING UP SINGLES FROM PIPE SHED. *PAD OPERATOR CONNECTED ESD ON WELL END 1 -57 TO ESD CONTROL STATION ON RIG FLOOR AND DOYON TOOLPUSHER WITNESSED FUNCTION TESTING OF ESD ON WELL END 1 -57. TEST GOOD, WELL SHUT IN. -OUTER ANNULUS PRESSURE = 0 PSI 12:00 - 12:30 0.50 FISH P DECOMP INSPECT RIG EQUIPMENT. - CHECKED THE DRAW WORKS, TOP DRIVE, BRAKES. 12:30 - 13:30 1.00 FISH P DECOMP RUN IN HOLE CONT. -RIH FROM 1059' TO 11009', PICKING UP SINGLES FROM SHED. 13:30 - 16:30 3.00 FISH N RREP DECOMP CHANGE OIL IN TOP DRIVE. -PJSM, DRAINED HYDRAULIC OIL ON TOP DRIVE AND ADD RED HYDRAULIC FLUID. - FUNCTION TEST TOP DRIVE CONTROLS. Printed 5/20/2013 10:03:49AM • • North America ALASKA - BP , 4 ,, Operation Summary Report 4 y Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date. 3/31/2013 X4 -00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147 °57'25.901 "W Active datum: Kelly Bushing / Rotary Table t58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 17:30 1.00 FISH P DECOMP RUN IN HOLE CONT. -RIH FROM 11009' TO 11452', PICKING UP SINGLES FROM SHED. -SLOW PUMP RATES AT 11448' MD, WITH 8.8 PPG BRINE. -PUMP # 1 - 20 SPM= 100 PSI./ 30 SPM= 160 PSI. -PUMP #2- 20 SPM= 80 PSI./ 30 SPM= 150 PSI. 17:30 - 18:00 0.50 FISH P DECOMP TAG TUBING STUB, DRESS OFF. -I*IH AND TAG TUBING STUB AT 11471'. -PULL UP AND ESTABLISH PARAMETERS. -PICK UP WEIGHT= 220K, SLACK OFF WEIGHT= 185K, ROTATE WEIGHT= 205K -TAKE SLOW PUMP RATES - CIRCULATE 5 BPM (50 SPM) 207 GPM WITH 440 PSI: 50 RPM WITH 4K TORQUE. - ROTATE DOWN OVER STUB WITH 7K TORQUE, WASH DOWN TO 11,474'. -TURN OFF ROTARY AND WORK OVER TUBING STUB TWO TIMES WITH NO PROBLEM. 18:00 - 19:00 1.00 FISH._ P DECOMP 'FLOW CHECK, CIRCULATE. -FLOW CHECK WELL FOR 10 MINUTES, WELL STATIC. -LINE UP AND PUMP A DRY JOB. -BLOW DOWN TOP DRIVE. -HAD 117 STANDS AND A DOUBLE IN THE HOLE. -PICK UP 1 LAST JOINT OF 4" DRILL PIPE FROM SHED TO MAKE UP STAND # 118. -SPILL DRILL. 19:00 - 23:00 4.00 FISH P DECOMP PJSM, PULL OUT OF HOLE WITH TUBING STUB DRESS OFF ASSEMBLY -POOH FROM 11,421' TO 2967'. -SIM- OPS: SET TUBING SPOOL IN CELLAR. -GET TOOLS READY FOR SLIP AND CUT DRILLING LINE. 23:00 - 00:00 1.00 FISH P DECOMP PJSM, SLIP AND CUT. - START SLIP AND CUT DRILLING LINE OPERATIONS. -OUTER ANNULUS PRESSURE = 0 PSI 3/18/2013 00:00 - 01:30 1.50 FISH P DECOMP SERVICE RIG. -SLIP AND CUT 59.5' DRILLING LINE CONT. - LUBRICATE RIG. 01:30 - 03:30 2.00 FISH P DECOMP PULL OUT OF HOLE CONT. - CONTINUE TO POOH FROM 2967' TO 310'. Printed 5/20/2013 10:03:49AM • North America - ALASKA - BP Operation Summary Report Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X400X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM 1 Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 014757'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 04:30 1.00 FISH P DECOMP MAKE UP BHA #2 (PACKER MILLING ASSEMBLY) -FLOW CHECK WELL FOR 10 MINUTES, WELL STATIC. -RACK BACK DRILL COLLARS IN DERRICK -BREAK OUT AND LAY DOWN DRESS OFF BHA -EMPTY BOOT BASKET (2 GALLONS OF SCALE AND 1 PIECE OF METAL (HALF MOON SHAPED) IN BOOT BASKET) -MAKE UP MASTER MILL(8 1/2" X 6 5/8" SHOE) AND WASHPIPE (16') AND RUN IN HOLE -ADD 2 BOOT BASKETS TO BHA 04:30 - 09:00 4.50 FISH P DECOMP RUN IN HOLE WITH BHA #2. 1 -PICK UP 12 SINGLES FROM PIPE SHED. -RIH FROM 339' WITH MILL SHOE BHA TO 5560'. - 09:00 - 11:00 2.00 FISH P DECOMP SET RTTS. -PICK UP HES 9 5/8" STORM PACKER -SET STORM PACKER AT 107'. -BACK OUT 21 TURNS TO RELEASE FROM RUNNING TOOL. -PULL OUT OF HOLE WITH RUNNING TOOL AND RACK 1 STAND BACK IN DERRICK -TEST 250 PSI LOW AND 2500 PSI. HIGH FOR _ 4 5 CHARTED MINUTES EACH -GOOD TEST. 11:00 - 11:30 0.50 FISH P DECOMP I PULL WEAR BUSHING. -BLOW DOWN CHOKE AND KILL LINE. — - -PULL WEAR BUSHING. _ 11:30 - 12:00 0.50 FISH N RREP DECOMP RIG DOWN TOP DRIVE. -PREP WORK ON TOP DRIVE TO CHANGE OUT ROTATING LINK ADAPTER ASSEMBLY. -OUTER ANNULUS PRESSURE = 0 PSI 12:00 - 15:00 3.00 FISH N RREP DECOMP PJSM, DISCONNECT TOP DRIVE ASSEMBLY. - DISCONNECTED TORQUE TUBE, LINK TILT, AND [BOP ASSEMBLY. 15:00 - 00:00 9.00 WHSUR P DECOMP PJSM, CHANGE OUT TUBING SPOOL. - NIPPLE DOWN BOP STACK AND STAND BACK ON PEDESTAL. - REMOVE OLD TUBING SPOOL AND SECONDARY SEALS (9 5/8" YBT SEAL). l -COULD NOT GET OLD PRIMARY SEAL (12" X 9 5 /8" SB -3) OUT DUE TO CAP SCREWS ON SLIPS NOT BACKING OUT. - CONSULTED WITH TOWN AND DECIDED TO INSTALL NEW TUBING SPOOL AND SECONDARY SEALS AND TEST. - INSTALL NEW TUBING SPOOLAND NEW SECONDARY SEAL (9 5/8" YBT SEAL). 1- PACKED OFF VOID. -TEST VOID TO 250 PSI. LOW FOR 5 MINUTES, AND 3000 PSI HIGH FOR 30 MINUTES. -SIM- OPS: CONTINUE WORK ON TOP DRIVE ! ROTATING LINK ADAPTER. -DRIFT AND STRAP 4.5 SCAB LINER IN PIPE SHED. -OUTER ANNULUS PRESSURE = 0 PSI _ Printed 5/20/2013 10:03:49AM • North America - ALASKA - BP r ; r� 4 gration Summary Report Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4- 00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time. 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147 °57'25.901 "W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/19/2013 00:00 - 01:00 1.00 WHSUR P DECOMP TEST TUBING SPOOL VOID. -PJSM, TEST VOID TO 250 PSI. LOW FOR 5 MINUTES, AND 3000 PSI HIGH FOR 30 MINUTES. CHARTED BOTH SUCCESSFUL TEST. -RIG DOWN TEST EQUIPMENT. *_ SIMOPS- INSTALL NEW ROTATING LINK ADAPTER ASSEMBLY TO TOP DRIVE. 01:00 - 03:00 2.00 BOPSUR P DECOMP NIPPLE UP BOPE. - F;JSM, PICK UP BOPE STACK OFF OF STUMP AND ASSEMBLE TO TUBING SPOOL - NIPPLE UP OUTER VALVE ON IA. * SIMOPS- INSTALLING COMPONENTS AND HOSES ON NEW ROTATING LINK ADAPTER ASSEMBLY. 03:00 - 05:00 2.00 WHSUR P DECOMP TEST OUTER VALVE ON IA -PJSM, TEST OUTER VALVE ON IA TO 250 LOW /3500 HI FOR 5 MINUTES EACH ON CHART. *SIMOPS- DRESSING TOP DRIVE OUT FROM REPLACING ROTATING LINK ADAPTER ASSEMBLY. 05:00 - 08:30 3.50 WHSUR N RREP DECOMP REPAIR TOP DRIVE. -PJSM, DRESS OUT TOP DRIVE WITH HOSES AND COMPONENTS. - FUNCTION TEST TOP DRIVE. 08:30 - 09:30 1.00 WHSUR , P DECOMP CONTINUE TO NIPPLE UP BOPE. / 09:30 - 12:00 2.50 WHSUR ' P DECOMP SHELL TEST ON BOP BREAKS. V - CONDUCT SHELL TEST ON BREAKS ON BOP STACK. -TEST 250 PSI. LOW/ 3500 PSI. HIGH FOR 5 CHARTED MINUTES EACH. -HAD TO CHANGE 0-RING IN DUTCH RISER LOCK DOWN SCREW. - ISOLATE LEAK, FOUND THAT THE TEST PLUG WAS LEAKING. -RUN IN LOCK DOWN SCREWS ON TEST PLUG. -TEST BREAKS ON STACK TO 250 PSI. LOW/ 3500 PSI. HIGH, TESTED GOOD. -OUTER ANNULUS PRESSURE = 0 PSI. 12:00 - 13:00 1.00 WHSUR P DECOMP SHELL TEST ON BOPE BREAKS. -PJSM, CONTINUE SHELL TEST ON BREAKS ON BOPE STACK. -TEST 250 PSI. LOW/ 3500 PSI. HIGH FOR 5 CHARTED MINUTES EACH. -RIG DOWN TEST EQUIPMENT AND PULL TEST PLUG. 13:00 - 13:30 0.50 WHSUR P DECOMP INSTALL WEAR BUSHING. -PJSM, RIH AND INSTALL WEAR BUSHING, ID= 12.25" / OD= 13.625" -RUN IN 4 LOCK DOWN SCREWS TO SECURE WEAR BUSHING. -PJSM, BLOW DOWN CHOKE AND KILL LINE. Printed 5/20/2013 10:03:49AM • • North America - ALASKA B / ' 1 Operation Summary Repo Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4 -00X5P -E:RIG (4,632,000.00 ) Project: Endicott I Site: End MPI Rig Name /No.: DOYON 14 I Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table l58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 14:00 0.50 WHSUR P DECOMP . RETRIEVE RTTS, -PJSM ON RTTS RETRIEVAL PROCEDURE WITH HALLIBURTON REPRESENTATIVE. 14:00 - 15:30 1.50 WHSUR N RREP ED COMP TOP DRIVE REPAIR. -PJSM, TROUBLE SHOOT TOP DRIVE. - REPLACE HYDRAULIC CARTRIDGE AND FUNCTION TEST, GOOD. 15:30 - 17:00 1.50 WHSUR P DECOMP RETRIEVE RTTS. -PJSM, CHANGE OUT BAILS. -RIH 1 STAND AND MAKE UP FULL OPEN SAFETY VALVE ON STAND. -SCREW IN RTTS RETRIEVAL TOOL, 20 1/2 TURNS TO THE RIGHT. -CHECK FOR PRESSURE ON DRILL PIPE WITH FULL OPENING SAFETY VALVE, NO PRESSURE. -SHUT IN ANNULAR, PULL TO PICK UP WEIGHT AND CHECK FOR PRESSURE, NO PRESSURE. -FLOW CHECK WELL FOR 10 MINUTES, WELL STATIC. -PULL OUT OF HOLE WITH RTTS AND LAY DOWN. 17:00 - 18:30 1.50 WHSUR P DECOMP I CIRCULATE BOTTOMS UP. -BLOW DOWN CHOKE LINE. I -CIRC BOTTOMS UP, PUMP 6 BARRELS PER MINUTE WITH 350 PSI. 18:30 - 19:30 1.00 WHSUR P j DECOMP FLOW CHECK. -FLOW CHECK WELL FOR 10 MINUTES, WELL STATIC. -BLOW DOWN TOP DRIVE. I -PREP FOR CASING TEST. 19:30 - 20:30 1.00 WHSUR P DECOMP INNER ANNULUS CASING TEST WITH DRILL 'PIPE IN HOLE AT 5562'MD. -PJSM, CLOSE ANNULAR AND DOUBLE CHECK VALVE ALIGNMENT. - PRESSURE UP TO 250 PSI. LOW FOR 5 MINUTES AND CHART SAME, GOOD. 3000 PSI. HIGH FOR 30 CHARTED MINUTES. - PRESSURE HELD 3000 PSI FOR 4 MINUTES I THEN BLED OFF QUICKLY TO 0 PSI. -10.2 BARRELS TO PRESSURE UP. - DOUBLE CHECKED EVERYTHING INCLUDING OUTER ANNULUS. -HAD A VACUUM ON THE DRILL PIPE AND INNER ANNULUS. *CALLED FOR TWO VAC TRUCKS TO TAKE ON HEATED WATER AND GO TO MI MUD PLANT 'AT 20:30 HOURS. *CONTACTED MUD ENGINEER FOR NOTICE I OF NEEDING TWO LOADS INSTEAD OF ONE. Printed 5/20/2013 10:03:49AM • • North America - ALASKA - BP Operation Summary Report , ,, , � ,; Common Well Name. 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 1 End Date: 3/31/2013 X4 -00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901 "W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 21:00 0.50 WHSUR P DECOMP FILL HOLE. - ATTEMPT TO FILL THE HOLE PUMPING DOWN THE DRILL PIPE AND DOWN ANNULUS THROUGH KILL LINE. -PUMP 5 BARRELS PER MINUTE WITH 0 PSI. -TOOK 84 BARRELS TO FILL THE HOLE. - ESTABLISH LOSS RATE. - FLUID LOSS RATE OF 18 BARRELS EVERY 15 MINUTES WHICH EQUATES TO 216 BARRELS PER HOUR. -RIG DOWN TEST EQUIPMENT, BLOW DOWN CEMENT LINE. -PREP FOR RUNNING IN HOLE WITH BHA #2 MASTER MILL ASSEMBLY. *CONTACTED DAY WSL, RWO SUPERINTENDENT AND TOWN ENGINEER. *AGREED TO KEEP HOLE FILL RATE AT 60 , BARRELS PER HOUR. 21:00 - 23:30 2.50 FISH P DECOMP RUN IN HOLE WITH MILLASSEMBLY BHA. -PJSM, RUN IN HOLE FROM 5562' TO 11,450'. -FILL INNER ANNULUS 60 BARRELS EVERY HOUR, 15 BARRELS EVERY 15 MINUTES. 23:30 - 00:00 0.50 FISH_ P DECOMP LOCATE PACKER. - OBTAIN PARAMETERS AT 11,450'. -PICK UP WEIGHT= 230K, SLACK OFF WEIGHT= 186K, ROTATE WEIGHT= 210K, 30 RPM WITH 4K TORQUE. -RUN IN HOLE AND TAGGED PACKER AT 11'480'. - CONTINUE TO FILL INNER ANNULUS WITH 15 BARRELS EVERY 15 MINUTES. - 384 BBLS FLUID LOST TO FORMATION FROM 20:30 UNTIL MIDNIGHT. -LOSS RATE AT 110 BARRELS PER HOUR. -TOTAL FLUID LOSSES TO WELL PAST 24 HRS. = 384 BARRELS. -OUTER ANNULUS PRESSURE = 0 PSI. 3/20/2013 00:00 - 01:00 1.00 FISH N FLUD DECOMP WAIT FOR VOLUME IN PITS. - DISPATCH SECOND VAC TRUCK FROM MI MUD PLANT TO RIG TO MIX BRINE ON LOCATION. -TALK WITH ENGINEER AT MUD PLANT AND NOT COMPLETE WITH FIRST LOAD. - CONTACT TRUCK DISPATCHER TO HAVE TRUCK WAITING AT MUD PLANT TO COME TO RIG. * TABLETOP KICK WHILE TRIPPING DRILL. 01:00 - 03:30 2.50 FISH N FLUD DECOMP MIX 8.8 BRINE IN PITS. -PJSM, OFFLOAD 283 BARRELS OF 120 DEGREE WATER. - WEIGHT UP TO 8.8 NACL BRINE. - CONFIRM SECOND TRUCK EN -ROUTE FROM MUD PLANT. -580 BARRELS ON LOCATION OF 8.8 BRINE. Printed 5/20/2013 10:03:49AM • i , me a'a North America - ALA'', �' e , Operation Summary Report Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4- 00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table ©58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT % NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 07:00 3.50 FISH P DECOMP MILL ON PACKER... � - OBTAIN PARAMETERS. -PICK UP WEIGHT =230K, SLACK OFF WEIGHT =186K, ROTATING WEIGHT =210K, PUMP PRESSURE IS 30 PSI AT 2 BARRELS PER MINUTE, ROTATIONS PER MINUTE =80, TORQUE OFF BOTTOM =5K FOOT POUNDS, TORQUE ON BOTTOM =7K TO 9K FOOT POUNDS. -MILL FROM 11,481'MD AT 3 BARRELS PER MINUTE FOR 30 MINUTES WITH NO INDICATION OF HOLE FILLING AFTER PUMPING 90 BARRELS AWAY SLOW PUMP RATE TO 2 BARRELS PER MINUTE AND !CONTINUE TO MILL TO A DEPTH OF 11,482'MD. - PARTIAL MINIMAL RETURNS AND PUMP PRESSURE INCREASED TO 150 PSI. AT 06:00 HOURS FOR 5 MINUTES. - PERFORMED FLOW CHECK AND VERIFIED WELL STILL ON VACUUM. - CONTACT TRUCK DISPATCH FOR THIRD TRUCK AT 06:00 HOURS. -TRUCK AVAILABLE AT 07:00 HOURS. 07:00 - 09:00 2.00 FISH FLUD DECOMP MIX 8.8 BRINE IN PITS. -WEIGHT UP TO 8.8 NACL BRINE. -CONTINUE TO FEED HOLE ATA RATE OF 60 BARRELS PER HOUR. 09:00 - 12:00 3.00 FISH P _ DECOMP CONTINUE TO MILL ON PACKER. - RESUME MILLING ON PACKER WITH PARAMETERS, PICK UP WEIGHT =230K, SLACK OFF WEIGHT =186K, ROTATING WEIGHT =210K, PUMP PRESSURE IS 30 PSI AT I2 BARRELS PER MINUTE, ROTATIONS PER MINUTE =80, TORQUE OFF BOTTOM =5K FOOT POUNDS, TORQUE ON BOTTOM =7K TO 9K FOOT POUNDS. -NO FLUID RETURNS. -MILL FROM 11,482' MEASURED DEPTH TO 11,484' MEASURED DEPTH. -FLUID LOSSES FROM MIDNIGHT TO NOON= 1448 BBLS. !-ESTIMATED FLUID LOSSES AT 120.6 BARRELS PER HOUR. -OUTER ANNULUS PRESSURE = 250 PSI. 12:00 - 12:30 0.50 FISH P DECOMP CONTINUE TO MILL ON PACKER. - PACKER CAME FREE AT 12:10 PM. - PUSHED DOWN TO 11,532' MEASURED DEPTH. -SHUT IN ANNULAR AND BULLHEAD 75 BARRELS DOWN DRILL PIPE AND INNER ,ANNULUS. -PUMP AT 8 BARRELS PER MINUTE WITH 30 PSI. PUMP PRESSURE. Printed 5/20/2013 10:03:49AM • • • u4,4 North America - ALASKA BP l ''' O peration Summary Rep Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4 -00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147 °57'25.901 "W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 12:45 0.25 FISH P DECOMP FLOW CHECK. - MONITOR CHOKE MANIFOLD FOR PRESSURE FOR 10 MINUTES, 0 PRESSURE OBSERVED. - CONFIRM WELL ON VACUUM THROUGH NEEDLE VALVE ON CHOKE. -BLOW DOWN CHOKE AND KILL LINES. - RECONFIRM WELL ON VACUUM. -OPEN ANNULAR. *OUTER ANNULUS PRESSURE UP TO 450 PSI. 'BLEED OUTER ANNULUS TO FLOWBACK TANK *BLED OFF LESS THAN 1 MINUTE. *CONFIRM FLUID AND NOT GAS AT NEEDLE VALVE. *BLOW OUT HARDLINE TO FLOWBACK TANK 12:45 - 13:00 0.25 FISH P DECOMP ATTEMPTTQ WASH DOWN PACKER. -PUMP DOWN DRILL PIPE AT 8 BARRELS PER MINUTE 30 PSI. PUMP PRESSURE. - - PACKER NOT MOVING FROM 11, 532'. 13:00 - 18:30 5.50 FISH P DECOMP' - PULL OUT OF HOLE WITH MILLING ASSEMBLY. -PJSM, PULL OUT OF HOLE FROM 11,450' TO 340'. - ADDING 60 BARRELS PER HOUR DOWN INNER ANNULUS PLUS PIPE DISPLACEMENT. 18:30 - 21:00 2.50 FISH "' P DECOMP BREAK AND LAY DOWN MILL BHA. -FLOW CHECK WELL FOR 10 MINUTES, WELL ON VACUUM. -PJSM, STAND BACK LAST STAND OF DRILL PIPE AND STAND BACK DRILL COLLARS IN DERRICK. - PULLED REMAINING ASSEMBLY TO FLOOR, COVERED HOLE AND USING A MIRROR AND FLASHLIGHT OBSERVED PACKER PARTS IN BARREL OF WASH PIPE. -PARTS APPEAR TO BE RINGS FROM TOP OF PACKER ASSEMBLY. -LAY DOWN WASH PIPE AND BOOT BASKETS FROM MOUSE HOLE. - RECOVERED APPROXIMATELY 50 POUNDS OF METAL FROM BOOT BASKETS. -METAL WAS FINE GROUND THEIR WERE 3 GALLONS RECOVERED. 21:00 - 23:30 2.50 FISH P DECOMP MAKEUP OVERSHOT BHA -PJSM, MAKE UP BHA #3 OVERSHOT ASSEMBLY TO RETRIEVE PACKER. - OVERSHOT HAS A 8-3/8" GUIDE WITH A 4-1/2" BASKET GRAPPLE ( MCP IS 4-5/8" ) Printed 5/20/2013 10•03:49AM • • ir s Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4-00X5P-E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 10147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date 1 From - To Hrs Task I Code NPT 1 NPT Depth Phase Description of Operations (hr) (usft) _ 23:30 - 00:00 0.50 FISH P DECOMP RUN IN HOLE WITH OVERSHOTASSEMBLY. -PJSM, RUN IN HOLE FROM DERRICK FROM 324' MEASURED DEPTH TO 2032' MEASURED 1DEPTH. -FLUID LOSSES FROM NOON TO MIDNIGHT= 931 BBLS. -TOTAL FLUID LOSS FOR THE PAST 24 HOURS= 2379 BBLS - ESTIMATED FLUID LOSSES AT 99.125 BARRELS PER HOUR. -OUTER ANNULUS PRESSURE = O PSI. 3/21/2013 00:00 - 03:30 3.50 FISH P DECOMP CONTINUERUNNING IN HOLE WITH ;OVERSHOT ASSEMBLY. -PJSM, E 2632' MEASURED RUN IN DEPTH HOLE OUT TO OF 11D,430' RRICK FROM (MEASURED DEPTH. -MAKE UP TOP DRIVE AND RESET DEPTH ON TOTCO AT CONNECTION. 03:30 - 05:00 1.50 FISH P DECOMP LOCATE AND LATCH PACKER. - OBTAIN PARAMETERS. -PICK UP WEIGHT =240K, SLACK OFF WEIGHT =185K, ROTATING WEIGHT WITHOUT PUMPING =212K. -LOWER IN HOLE TO 11,530' MEASURED DEPTH AND SET 5K WEIGHT ON FISH. -PICK UP AND SEE NO INDICATION OF DRAG OR WEIGHT GAIN. -530' RED DEPTH LOWER AND IN SET HOLE 12K TO WEIGHT 11, ON MEASU FISH. 1 -PICK UP AND SEE NO INDICATION OF DRAG OR WEIGHT GAIN. -LOWER IN HOLE TO 11,530' MEASURED DEPTH AND SET 30K WEIGHT ON FISH. 1-PICK UP TO 11,480' MEASURED DEPTH WITH II NO INDICATION OF DRAG OR WEIGHT GAIN. -LOWER STRING TO 11,530' MEASURED E -T DEPTH URN OFF AND HOLE SET FILLAND 5K WIGHT LINE ON UP FISH. TO PUMP DOWN DRILL PIPE. -PUMP AT 6 BARRELS PER MINUTE WITH 20 PSI. PUMP PRESSURE, AFTER 19 BARRELS AWAY PRESSURED UP TO 700 PSI. SHUT PUMPS DOWN AND PRESSURE HELD AT 500 PSI. -PULL OUT OF HOLE FROM 11,530' MEASURED DEPTH TO 11,460' MEASURED DEPTH CONFIRMING FISH LATCHED UP. -BLEED PRESSURE OFF, BREAK OUT AND STAND BACK STAND, DROP BALL AND ROD TO SHEAR PUMP OUT SUB. -BLOW DOWN TOP DRIVE AND PULL OUT AND LAY DOWN SINGLE FROM 11,460' MEASURED DEPTH TO 11,429' MEASURED DEPTH. -SHEAR PUMP OUT SUB. j -PUMP DOWN DRILL PIPE AT 2 BARRELS PER MINUTE AND PRESSURE UP TO 2500 PSI. 1 PUMP PRESSURE AND SHEAR PUMP OUT SUB. Printed 5/20/2013 10:03:49AM S % r orth America - ALASKA f ,' Operation Summary Rep Common Well Name: 1 -63 ' AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4 -00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name/No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 10:00 5.00 FISH P DECOMP PULL OUT OF HOLE WITH OVERSHOT AND FISH. -PJSM, PULL OUT OF HOLE FROM 11,429' MEASURED DEPTH TO 418' MEASURED DEPTH. -FLOW CHECK WELL FOR 10 MINUTES, WELL - -STILL ON VACUUM. - CONTINUE TO FEED HOLE AT A RATE OF 60 BARRELS PER HOUR. *SPILL DRILL. 10:00 - 10:30 0.50 FISH P DECAMP LAY DOWN OVERSHOT BHA. -PJSM, WITH NON - SHEARABLES ACROSS STACK. - DISCUSSED SOP FOR PUNCH HOLES IN TAIL PIPE. - BEAVER SLIDE OPERATIONS: MOBILIZE 4-1/2" HANDLING EQUIPMENT TO RIG FLOOR. *NOTIFICATION OF BOP TEST SENT TO AO 3CC AT 10:14 AM 3-21 -2013* ** WITNESS OF BOP TEST WAIVED BY -A©GCC INSPECTOR CHUCK SCHEVEAT 10:54 — AM 3-21- 2013 ** 10:30 - 12:00 1.50 FISH P DECOMP CONTINUE TO LAY DOWN OVERSHOT BHA. -STAND BACK LAST STAND OF DRILL PIPE. -STAND BACK DRILL COLLARS. -PULL AND LAY DOWN JARS, BUMPER SUB AND OVERSHOT. - RECOVERED 6' 8" OF THE TUBING STUB AND TOP OF PACKER ASSEMBLY. -FLUID LOSSES FROM MIDNIGHT TO NOON= 845 BARRELS. - ESTIMATED FLUID LOSSES AT 70.41 BARRELS PER HOUR. -OUTER ANNULUS PRESSURE = 0 PSI. 12:00 - 12:30 0.50 FISH P DECOMP RIG SERVICE. - GREASE AND INSPECT TOP DRIVE AND DRAW WORKS. 12:30 - 14:00 1.50 FISH P DECOMP MAKE UP SPEAR BHA # 4. -PJSM, MAKE UP BHA #4 WITH 3 -1/4" ITCO SPEAR ASSEMBLY. -SPEAR DRESSED WITH 3.947" GRAPPLE. 14:00 - 17:00 3.00 FISH P DECOMP RUN IN HOLE WITH SPEAR FISHING ASSEMBLY. -RIH FROM 325' TO 7921'. - FILLING INNER ANNULUS WITH 60 BARRELS OF 1% KCL PER HOUR. *KICK WHILE TRIPPING DRILL- D1 17:00 - 19:30 2.50 FISH P DECOMP SLIP AND CUT DRILL LINE. -PJSM, SLIP AND CUT 59' OF DRILL LINE. - GREASE AND INSPECT TOP DRIVE. 19:30 - 21:30 2.00 FISH P DECOMP CONTINUE RUN IN HOLE. - CONTINUE RIH FROM 7921' TO 11471' - CONTINUE FILLING INNER ANNULUS AT 60 BARRELS PER HOUR. Printed 5/20/2013 10:03:49AM • • North America A Operation Summa Common Well Name: 1-63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4 -0OX5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code I NPT NPT Depth I Phase Description of Operations (hr) (usft) 21:30 - 23:30 2.00 FISH P DECOMP OBTAIN PARAMETERS, ENGAGE FISH AND PULL FREE. -PICK UP 4" DRILL PIPE SINGLE (31.56') FROM PIPE SHED AND ADD TO STAND # 117. -RUN IN HOLE TO 11,467' MEASURED DEPTH AND OBTAIN PARAMETERS. -PICK UP WEIGHT= 248K, SLACK OFF WEIGHT= 176K. PJSM WITH CREW COMING ON TOUR. -TAG FISH AT 11,533' MEASURED DEPTH AND OBSERVED 3K DRAG THROUGHOUT SWALLOW. I- TAGGED NO-GO AT 11,538' MEASURED IDEPTH. -SET DOWN 10K ON FISH. -WORK STRING AND SPEAR SEVERAL TIMES AND OBSERVED 5K DRAG AND OVER PULL. -SET DOWN. ON FISH WITH 3K WEIGHT ON FISH AND TURNED STRING TO LEFT 1 TURN SET DOWN 15K WEIGHT ON FISH, WORK STRING SETTING 5K TO 15K WEIGHT ON FISH. -PULL OUT OF HOLE FROM 11,538' MEASURED DEPTH TO 11,438' MEASURE DEPTH. - PICKED UP AND OBSERVED 20K TO 25K INCREASE IN WEIGHT AT 11,478' MEASURED DEPTH. H. -STAND BACK STAND AND LAY DOWN WORKING SINGLE. -BLOW DOWN TOP DRIVE. 23:30 - 00:00 0.50 FISH P DECOMP I PULL OUT OF HOLE WITH FISH. PULLED FROM 11,438' MEASURED DEPTH TO 11,055' MEASURED DEPTH. -LIMIT PULLING SPEED TO 100 FEET PER MINUTE. - CONTINUE FILLING INNER ANNULUS AT 60 ' BARRELS PER HOUR. -FLUID LOSSES FROM MIDNIGHT TO NOON= 840 BARRELS. - ESTIMATED FLUID LOSSES AT 70 BARRELS PER HOUR. -OUTER ANNULUS PRESSURE = 0 PSI. 3/22/2013 00:00 - 05:00 5.00 FISH P DECOMP PULL FISH OUT OF HOLE WITH SPEAR ASSEMBLY. -PULL FROM 11,055' MEASURED DEPTH TO 418' MEASURED DEPTH. - PULLING AT A SPEED OF 100 FEET PER MINUTE MAXIMUM. - CONTINUE FILLING INNER ANNULUS AT 60 BARRELS PER HOUR. Printed 5/20/2013 1 0:03:49AM • • ®_ Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4 -0OX5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) _ Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 08:30 3.50 FISH P DECOMP I LAY DOWN FISH AND SPEAR FISHING ASSEMBLY. 1 -PJSM ON NON SHEARABLES ACROSS BOPE STACK, PUNCHING TAIL PIPE AND LAYING `DOWN FISH. -STAND BACK LAST STAND OF DRILL PIPE 1AND DRILL COLLARS. -LAY DOWN JARS, BUMPER SUB WITH SPEAR TO PIPE SHED. -PUNCH AND LAY DOWN PACKER AND TAIL PIPE. ( 100% FISH RECOVERY ) -PICK UP JARS, BUMPER SUB AND SPEAR. -BREAK APART AND LAY DOWN SAME. - CONTINUE FILLING INNER ANNULUS AT 60 BARRELS PER HOUR. 08:30 - 10:00 1.50 FISH P DECOMP LAY DOWN 6.25" DRILL COLLARS. -PJSM, RUN IN THE HOLE TO 277 FEET. -PULL OUT OF HOLE LAYING DOWN 6.25" DRILL COLLARS TO PIPE SHED. 10:00 - 11:00 1.00 FISH P DECOMP CLEAN AND CLEAR RIG FLOOR. - -PJSM BEAVER SLIDE OPERATIONS. - REMOVE ALL OF BAKER TOOLS FROM RIG FLOOR. 11:00 - 11:30 0.50 WHSUR P DECOMP PULL WEAR BUSHING. -PJSM, PICK UP RETRIEVING TOOL AND LATCH SAME INTO BUSHING. -BACK OUT LOCK DOWN SCREWS AND PULL WEAR BUSHING TO FLOOR. 11:30 - 12:00 0.50 BOPSUR P -- DECOMP lBOPE TESTING. -PJSM,MAKE UP CROSSOVER ON TOP DRIVE FOR TESTING. - INSTALL TEST PLUG AND RUN IN THE LOCK I DOWN SCREWS TO ENGAGE TEST PLUG. -FILL 60 BARRELS PER HOUR DOWN THE INNER ANNULUS THROUGH THE INJECTION I LINE. `930 BBLS LOST FOR TOUR. *OUTER ANNULUS PRESSURE = 0 PSI. _ 12:00 - 12:30 0.50 BOPSUR P DECOMP RIG UP FOR TESTING BOPE. PJSM, RIG DOWN SAFETY JOINT AND PREPARE FULL OPENING SAFETY VALVES FOR TESTING. Printed 5/20/2013 10:03:49AM • • Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) , Start Date: 3/13/2013 End Date: 3/31/2013 X4 -00X5P -E:RIG (4,632,000.00 ) Project: Endicott I Site: End MPI Rig Name/No.: DOYON 14 'I Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. i UWI: / Lat: 070 °21'07.268 "8 Long: 1 0147 °57'25.901 "W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 12:30 - 00:00 11.50 BOPSUR P I DECOMP TESTING BOPE'S WITH 4" AND 4 -1/2" TEST JOINTS, WITH 3 -1/2" x 6" VBR'S IN TOP AND BOTTOM RAMS. -PJSM, PRESSURE TEST 250 PSI LOWAND 3500 PSI HIGH FOR 5 MINUTES EACH. - BEFORE SWAPPING TEST JOINTS FROM 4" TO 4-1/2" ATTEMPTED TO PERFORM DRAW DOWN ON ACCUMULATOR. -OBSERVED DURING TEST AIR PUMP NOT FUNCTIONING. - NOTIFIED DAY WELL SITE LEADER AND WORKOVER SUPERINTENDENT OF SITUATION. - SWAPPED TEST JOINTS FROM 4" TO 4 -1/2" AND FINISHED TESTING STACK WHILE MECHANIC WAS MOBILIZED. -FILL 60 BARRELS PER HOUR DOWN THE INNER ANNULUS THROUGH THE INJECTION LINE. ' *WITNESS OF BOPE TESTING WAIVED BY STATE AOGCC INSPECTOR CHUCK SCHEVE. *LOSS FOR TOUR 910 BBLS, LOSS FOR 24 HOURS 1840 BBLS. *AVERAGE LOSS PER HOUR IS 77 BARRELS. *OUTER ANNULUS PRESSURE = 0 PSI. 3/23/2013 100:00 - 04:30 4.50 SOPSUR N RREP DECOMP REPAIR ACCUMULATOR. -PJSM, PULL TEST JOINT FROM STACK. -CLOSE BLIND RAMS. -CLOSE CHOKE HCR, CHOKE MANUAL, KILL HCR AND KILL MANUAL VALVES ON MUD CROSS. - -PJSM, REPAIR AIR PUMP ON ACCUMULATOR. -FILL 60 BARRELS PER HOUR DOWN THE INNER ANNULUS THROUGH THE INJECTION LINE. 04:30 - 05:00 0.50 BOPSUR P DECOMP OPEN BLIND SHEARS, ACCUMULATOR DRAW DOWN TEST. -PJSM, VERIFY NO PRESSURE UNDER BLIND SHEARS AT CHOKE MANIFOLD AND MUD MANIFOLD FROM KILL LINE. -OPEN BLIND SHEARS. I- INSTALL 4" TEST JOINT AND MAKE UP TO ' TEST PLUG. - PERFORM ACCUMULATOR DRAW DOWN TEST. 05:00 - 06:30 1.50 BOPSUR P DECOMP PULL TEST PLUG AND INSTALL WEAR BUSHING. -PJSM, STOP HOLE FILL PUMP AND FLOW CHECK INNER ANNULUS. -BACK OUT LOCK DOWN SCREWS. -PULL TEST PLUG AND LAY DOWN SAME. -BLOW DOWN CHOKE AND KILL LINES. -PJSM, INSTALL WEAR BUSHING. 06:30 - 07:00 0.50 DHB P DECOMP PICK UP HALLIBURTON 9 -5/8" RTTS. PJSM, MAKE UP TEST PACKER TO DRILL PIPE. Printed 5/20/2013 10:03:49AM • • North America - ALASKA z � ,19;;S,/ Operation Summary Report Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 1X4 - 00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147 °57'25.901 "W _ Active datum: Kelly Bushing / Rotary Table ©58.00usft (above Mean Sea Level) Date From - To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 12:00 5.00 DHB P DECOMP RUN IN THE H OLE WITH 9-5/8" RTTS ON 4" I DRILL PIPE. -PJSM, RUN IN HOLE WITH TEST PACKER FROM 16' MEASURED DEPTH TO 11,411' MEASURED DEPTH. *KICK WHILE TRIPPING DRILLAND MR HELD, RESPONSE TIME 1:17 MINUTES -PICK UP WEIGHT 240 K, SLACK OFF WEIGHT 1165K. 1- CONTINUE TO RUN IN THE HOLE TO 11,475' MEASURED DEPTH. 12:00 - 14:00 2.00 DHB P DECOMP -SET 9 -5/8" RTTS AT 11,475' MEASURED DEPTH. - PUMP 80 BARRELS AN HOUR DOWN THE DRILL PIPE. - ATTEMPT TO FILL INNER ANNULUS AT 6 BARRELS PER MINUTE WITH 540 PSI. PUMP PRESSURE. -PUMP 250 BARRELS DOWN THE INNER AANNULUS. -NO RETURNS RECEIVED BACK. *OUTER ANNULUS BUILT UP TO 100 PSI. -BLEED SAME TO FLOWBACK TANKAT 14:00 I HOURS. 14:00 - 15:30 1.50 DIES P L DECOMP RACK BACK ONE STAND OF DRILL PIPE AND � PULL UP TO 11,375' MEASURED DEPTH. -MAKE UP TOP DRIVE AND CONTINUE PUMPING 80 BARRELS AN HOUR DOWN DRILL PIPE. - SET 9 -5/8" RTTS AT 11,375' ATTEMPT TO FILL INNER ANNULUS AT 6 BARRELS PER MINUTE WITH 540 PSI. , -PUMP 70 BARRELS AND OBSERVED HOLE FILL AT SURFACE. -SHUT DOWN AND LET AIR MIGRATE OUT OF INNER ANNULUS FOR CASING TEST. 15:30 - 17:30 2.00 DHB P DECOMP MECHANICAL INTEGRITY TEST OF INNER ANNULUS. -PJSM ON TESTING INNER ANNULUS. -SHUT ANNULAR AND PRESSURE TEST CASING TO 250 PSI LOW FOR 5 MINUTES AND 3000 PSI HIGH FOR 30 MINUTES. - CONTINUE PUMPING 80 BBLS DOWN THE DRILL PIPE DURING THE TEST. I -TOOK 7 BBLS TO PRESSURE UP TO 3000 PSI. RECEIVED 7 BBLS BACK AFTER TEST WAS OVER AND BLED OFF. - TEST APPROVED FROM RIG WORKOVER TEAM LEED JIM WILLINGHAM AT 17:10 HOURS. PJSM BLOW DOWN CHOKE, KILL AND TOP DRIVE. *FIRE DRILL HELD. 17:30 - 23:30 6.00 DHB P DECOMP PULL OUT OF HOLE WITH TEST PACKER. -PJSM, PULL OUT OF THE HOLE FROM 11,411' MEASURED DEPTH TO 16' MEASURED DEPTH. - FEEDING THE INNER ANNULUS 80 BARRELS AN HOUR PLUS PIPE DISPLACEMENT. Printed 5/20/2013 10:03:49AM • • North America - ALASKA - B: f Operation Summary Report ' • Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4 -00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 DHB P DECOMP FLOW CHECK WELL AND LAY DOWN TEST PACKER. -10 MINUTE FLOW CHECK. -LAY DOWN RTTS. *OUTER ANNULUS PRESSURE = 0 PSI. 3/24/2013 00:00 - 00:30 0.50 FISH P DECOMP BRING UP CLEAN OUT TOOLS THROUGH BEAVER SLIDE. -PJSM, MOBILIZE CLEAN OUT BOTTOM HOLE ASSEMBLY TO RIG FLOOR. 00:30 - 02:30 2.00 CLEAN N RREP DECOMP REPAIR HYDRAULIC LINE. -PJSM, SECURE WELL. - REPAIR HYDRAULIC LINE UNDER RIG FLOOR. - MONITOR WELL FOR TEN MINUTES AND OPEN SAME. -FEED THE INNER ANNULUS 80 BARRELS AN HOUR. 02:30 - 05:30 3.00 CLEAN P DECOMP MAKE UP CLEAN OUT ASSEMBLY. -PJSM, PICK UP AND MAKE UP 6" JUNK MILL ASSEMBLY WITH 8 -1/2" STRING MILL TO 1465'. 05:30 - 06:00 0.50 CLEAN P T DECOMP SERVICE RIG. h -PJSM, SERVICE AND INSPECT TOP DRIVE, k DRAW WORKS AND BLOCKS. 06:00 - 11:00 5.00 CLAN P DECOMP RUN IN HOLE WITH DRILL PIPE FROM I DERRICK. -PJSM, RUN IN HOLE WITH STANDS OF DRILL PIPE FROM 1465' TO 11,530'. -PUMP 8.5 PPG. 1% KCLAT 80 BARRELS PER HOUR THROUGH KILL LINE. -PICK UP WEIGHT 240 K, SLACK OFF WEIGHT 165 K, ROTATING WEIGHT AT 30 RPM 7K. 1-WASH DOWN FROM 11,530' TO 11,625' AT 7 BARRELS PER MINUTE WITH 540 PSI. -O DRAG NOTED GOING THROUGH TOP OF 7" LINER. -TOOK 35 BARRELS TO FILL PIPE. - CONTINUE TO RUN IN THE HOLE FROM 11,625' TO 12,000'. 11:00 - 13:00 2.00 CLEAN P DECOMP PUMP FLUID DOWN HOLE THROUGH BLEEDER AND DRILL STRING IN PREPARATION TO PUMPING FLO PRO PILL. - PREPARE PITS FOR FLO -PRO AND DISPLACEMENT TO 8.8 PPG BRINE. -CONTINUE FILLING THE INNER ANNULUS WITH 80 BARRELS PER HOUR. *OUTER ANNULUS PRESSURE = 0 PSI. 13:00 - 15:00 2.00 CLEAN P DECOMP DISPLACEMENT OF DRILLING FLUIDS. -PJSM, PUMP 100 BARRELS 8.8 PPG FLO PRO FOLLOWED BY 105 BARRELS 8.8 PPG BRINE. '- CIRCULATE FLO PRO AT4 BARRELS PER MINUTE WITH 40 PSI. PUMP PRESSURE. - CIRCULATE 8.8 BRINE AT 5 BARRELS PER MINUTE WITH 30 PSI. PUMP PRESSURE. 15:00 - 16:00 1.00 CLEAN P DECOMP PULL OUT OF HOLE FROM 12,000' TO 11,150' TO CHANGE OVER WELLBORE FLUID TO 8.8 1 BRINE. 1 -PJSM, BLOW DOWN TOP DRIVE. -PJSM, PULL OUT OF THE HOLE. -PULL FROM 12,000' TO 11,150' AT 1 -1/2 MINUTES PER STAND. Printed 5/20/2013 10:03:49AM • • --„/ 4 4 ." . , x14 „ Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 , End Date: 3/31/2013 X4- 00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147 °57'25.901 "W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code r NPT NPT Depth ! Phase Description of Operations (hr) _ (usft) 16:00 - 16:30 0.50 CLEAN P DECOMP CIRCULATE 8.8 PPG BRINE DOWN UNTIL RETURNS WERE SEEN AT SURFACE. -CIRCULATE AT 6 BARRELS PER MINUTE WITH 40 PSI. PUMP PRESSURE. -AFTER 45 BARRELS PUMPED PRESSURE INCREASED TO 210 PSI. PUMP PRESSURE. I -FINAL CIRCULATION WAS 6 BARRELS PER MINUTE WITH 430 PSI. -95 BARRELS PUMPED, RETURNS SEEN AT SURFACE. - CALCULATED STATIC FLUID LOSS AT 46 BARRELS AN HOUR. 16:30 - 17:00 0.50 CLEAN P DECOMP MONITOR WELL FOR 15 MINUTES. -PUMP UNTIL RETURNS TO SURFACE AGAIN. -10.5 BARRELS PUMPED TO OBTAIN RETURNS. -CALCULATED STATIC FLUID LOSS AT 42 BARRELS AN HOUR. 17:00 - 19:00 2.00 CLEAN P DECOMP DISPLACEMENT. - PJSM, PUMP 100 BARRELS OF 8.8 PPG FLO -PRO AND DISPLACE WITH 95 BARRELS OF 8.8 BRINE. CIRCULATE FLO PRO AT 2 BARRELS PER MINUTE WITH 300 PSI. PUMP PRESSURE. - CIRCULATE BRINE AT 6 BARRELS PER MINUTE WITH 750 PSI. PUMP PRESSURE. 19:00 - 20:00 1.00 EVAL P DECOMP MONITOR WELL. - PJSM, BLOW DOWN TOP DRIVE. -LINE UP AND CIRCULATE OVER HOLE WITH 8.5 PPG 1% KCL . -AFTER 44 BBLS PUMPED INTO ANNULUS RETURNS SEEN AT SURFACE. 20:00 - 23:30 3.50 CLEAN P DECOMP DISPLACEMENT . - PJSM,CONTINUE PUMPING 8.8 PPG BRINE DOWN HOLE TAKING RETURNS TO PITS. -CIRCULATE AT 4 BARRELS PER MINUTE WITH 200 PSI. PUMP PRESSURE. - PUMPED 592 BBLS. -SPOT CHECK ON DISPLACEMENT WAS 18 BARRELS DIFFERENCE. BLOW DOWN THE TOP DRIVE. -PJSM, BLOW DOWN. 23:30 - 00:00 0.50 CLEAN P DECOMP RUN IN THE HOLE. -PJSM, RUN IN THE HOLE FROM 11,150' TO 12,357'. -TAGGED UP AT 12,357'. *48' FEET EARLIER THAN PLANNED. -PICK UP TO 12,347'. 'OUTER ANNULUS PRESSURE = 0 PSI. Printed 5/20/2013 10:03:49AM • North America - ALASKA BP Operation Summary Report Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4 -OOX5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 10147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.O0usft (above Mean Sea Level) Date From - To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 3/25/2013 00:00 - 05:00 5.00 CLEAN P DECOMP CLEAN OUT 7" LINER TO 12,950'. - OBTAIN PARAMETERS. � -PICK UP WEIGHT =225K, SLACK OFF WEIGHT =190K, ROTATING WEIGHT =21 OK, TORQUE OFF =5K, RPM =60 -BREAK CIRCULATION AT 5 BARRELS PER MINUTE WITH 540 PSI. PUMP PRESSURE. -WASH DOWN AND TAG PACKER REMAINS AT 12,537'. -PICK BACK UP TO 12,347' AND REAM DOWN AT 60 RPM'S. -TAG AT 12,357' AND MILL FROM 12,537' TO 12,398'. -MILL UP PACKER REMAINS AND CEMENT WITH 60 TO 90 RPM'S, 3 TO 7.5 BARRELS PER MINUTE WITH PUMP PRESSURE FROM 540 PSI. TO 1000 PSI., WEIGHT ON MILL FROM 5K TO 10K. OBSERVED UP TO 60K OVERPULL AND TOP DRIVE STALL OUT SEVERAL TIMES WORKING JUNK. -BROKE THROUGH JUNK AT 12,375' AND CONTINUED MILLING THROUGH CEMENT WITH PUMP RATE INCREASED TO 7.5 BARRELS PER MINUTE WITH 1000 PSI. PUMP PRESSURE RUNNING 10K TO 15K WEIGHT ON MILL AND RPM'S AT 90 TOA DEPTH OF 12, 398' AND BROKE THROUGH CEMENT . 05:00 - 06:00 1.00 CLEAN P i DECOMP BULLHEAD 30 BARRELS. l - -PICK UP OFF BOTTOM FROM 12,398' TO 12,380'. -CLOSE ANNULAR AND PUMP DOWN DRILL PIPE AT 5 BARRELS PER MINUTE WITH 800 PSI PUMP PRESSURE. 1 -PUMP 30 BARRELS AND MONITOR DRILL PIPE AND ANNULUS. 1 -OBSERVED NO PRESSURE ON WELL AND OPENED SAME. 06:00 - 11:00 5.00 CLEAN P DECOMP WASH CARBOLITE FROM 7" CASING. -WASH DOWN FROM 12,398' TO 12,403. TAGGED UP ON CEMENT WITH 10 K DOWN. - PICKED UP ON DRILL STRING AND OBTAIN PARAMETERS. -FREE TORQUE AT 5K, ROTATE WEIGHT AT 210K, PICK UP WEIGHT 225K, SLACK OFF WEIGHT 190K, WEIGHT ON BIT 10 -15K. -MILL FROM 12,403' TO 12,425' WITH 70 RPM, BROKE THROUGH AT 12,425'. - CONTINUE TO WASH DOWN FROM 12,425' TO 12,950'. *LOSSES PRIOR TO BULLHEAD AT 30 BPH, LOSSES AFTER BULL HEADING AT 50 BPH. *OBTAINED SLOW PUMP RATES AT 06:45. Printed 5/20/2013 10:03:49AM • • North America - ALASKA BP ; Operation Summary Re orb Common Well Name: 1 -63 AFE No Event Type: WORKOVER MO) Start Date: 3/13/2013 End Date: 3/31/2013 X4- 00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table ©58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 13:45 2.75 CLEAN P DECOMP PUMP HIGH VIS SWEEP SURFACE TO SURFACE. -7 BARRELS PER MINUTE AT 1180 PSI AT 70 RPM ROTATING. *LOSSES FOR TOUR 533 BARRELS. *OUTER ANNULUS PRESSURE = 0 PSI AT '11:00. - CIRCULATE 7 BARRELS A MINUTE WITH 1060 PSI AT 70 RPM WITH 5 -7k TORQUE. BLOW DOWN TOP DRIVE. -PJSM AND PREPARE FOR PULLING OUT OF THE HOLE. -DROP HOLLOW 2.09 OD RABBIT WITH 105' TAIL. 13:45 - 14:30 0.75 CLEAN P DECOMP PULL OUT OF THE HOLE. -PJSM PULL OUT OF THE HOLE FROM 12,860' TO 12,290'. -PICK UP WEIGHT 235K, SLACK OFF WEIGHT 190K, GOT 30K OVERPULL. - SLACKED OFF AND CIRCULATE. 14:30 - 15:30 1.00 CLEAN P DECOMP PUMP OUT OF THE HOLE. - -PULL OUT AT 5 BARRELS A MINUTE WITH 360 - -PSI FROM 12,290' TO 11,530'. EXITED LINER TOP. 15:30 - 18:30 3.00 GLEAN P DECOMP PUMP HIGH -VIS SWEEP. -PUMP 30 BARRELS HIGH VIS SWEEP AT 6 BARRELS PER MINUTE AT 670 PSI. -RPM AT 30 WITH 5 -6K TORQUE. - CIRCULATE SURFACE TO SURFACE 777 BARRELS. 809 BARRELS PUMPED. *FIRE DRILL. BLOW DOWN TOP DRIVE. -PJSM, LINE UP TO RUN IN THE HOLE. 18:30 - 20:30 2.00 CLEAN P DECOMP WASH DOWN FROM 12,275 TO 12,950. - CIRCULATING 4-1/2 BARRELS PER MINUTE AT 430 PSI. 20:30 - 00:00 3.50 CLEAN P DECOMP PUMP HIGH VIS SWEEP. -PUMP SURFACE TO SURFACE AT 9 BARRELS PER MINUTE AT 1650 PSI AT 20 RPM WITH 5K TORQUE ROTATING PIPE. *SWEEP RETURNED WITH HIGH AMOUNT OF CARBOLITE AND SAND. - PUMPED 30 BARRELS OF HIGH VIS SWEEP SURFACE TO SURFACE. - CIRCULATED 11 BARRELS PER MINUTE AT 2010 PSI. *2ND SWEEP ON BOTTOM ALSO UNLOADED A HIGH AMOUNT OF CARBOLITE AND SAND. *784 BARRELS LOST IN HOLE FOR 24 HOURS. *OUTER ANNULUS PRESSURE = 0 PSI AT 23:00. Printed 5/20/2013 10:03:49AM i • North America - ALA i-� Operation Summary Report Common Well Name: 1 -63 ; AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4- 00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 I Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147 °57'25.901 "W Active datum: Kelly Bushing / Rotary Table ©58.00usft (above Mean Sea Level) Date From - To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 3/26/2013 00:00 - 03:30 3.50 CLEAN P ' DECOMP CONTINUE TO CIRCULATE CARBOLITES OUT OF THE HOLE AT 11 BARRELS PER MINUTE WITH 1600 PSI. PUMP PRESSURE. *2ND SWEEP ON BOTTOM ALSO UNLOADED A HIGH AMOUNT OF CARBOLITE AND SAND. -MIX UP AND PUMP THIRD HI -VIS SWEEP SURFACE TO SURFACE AT 12 BARRELS PER MINUTE WITH 1800 PSI. PUMP PRESSURE. *3RD SWEEP INDICATED HOLE CLEAN BRINGING LESS THAN HALF OF THE RESULTS OF FIRST 2 SWEEPS. - ROTATING WEIGHT 210 K, 30 RPM WITH 6K OF FREE TORQUE. PICK UP WEIGHT 235K, SLACK OFF WEIGHT 190K. - MONITOR WELL FOR 10 MINUTES 03:30 - 04:30 1.00 CLEAN P DECOMP PULL OUT OF HOLE ON ELEVATORS FROM 12,950' TO 235 ( -UP WEIGHT 235K 04:30 - 06:30 2.00 CLEAN P DECOMP I PUMP REMAINING FLO -PRO. I -PJSM, BREAK CIRCULATION AND PUMP AT 7 BARRELS PER MINUTE WITH 800 PSI. PUMP PRESSURE. -LINE UP TRUCKAND PUMP 90 BARRELS OF 8.8 FLO -PRO AND CHASE WITH 100 BARRELS OF 8.8 BRINE. -PUMP FLO -PRO FROM TRUCK AT 3 I BARRELS PER MINUTE WITH 200 PSI. PUMP PRESSURE. -CHASE WITH 100 BARRELS OF 8.8 BRINE AT 7 BARRELS PER MINUTE WITH 2000 PSI. PUMP PRESSURE. -BLOW DOWN TOP DRIVE AND MONITOR I WELL FOR 10 MINUTES. 06:30 - 10:00 3.50 CLEAN P DECOMP PULL OUT OF THE HOLE WITH CLEAN OUT I ASSEMBLY. -PJSM, PULL OUT OF THE HOLE FROM 11,245' TO 1,464'. -LAY DOWN CROSSOVERS AND WATER MELON MILL LEAVING DRILL PIPE ACROSS I STACK. -- - - -- - - -- -- 10:00 - 12:00 2.00 CLEAN P DECOMP I SLIP AND CUT DRILL LINE. -PJSM, INSTALL FULL OPENING SAFETY VALVE AND MAKE UP TOP DRIVE. -CUT AND SLIP 30' OF DRILLING LINE. - SERVICE AND INSPECT THE TOP DRIVE, i BLOCKS AND DRAW WORKS. -BREAK OUT TOP DRIVE AND FULL OPENING SAFETY VALVE. *OUTER ANNULUS PRESSURE = 0 PSI 12:00 - 15:30 3.50 CLEAN P DECOMP LAY DOWN BHA. -PJSM LAY DOWN (35) JOINTS OF 4" DRILL I PIPE AND (9) JOINTS OF 4 -3/4" DRILL COLLARS. -LAY DOWN FISHING JARS, BOOT BASKETS AND MILL. 15:30 - 16:00 0.50 CLEAN P DECOMP HANDLE BHA. -CLEAN OUT BOOT BASKETS "15 LBS OF METAL RECOVERED FROM STRING MAGNETS. *JUNK MILL GAUGED AT 5.25" FROM 6 ". * WATERMELON MILL GAUGED AT 6 ". Printed 5/20/2013 10:03:49AM • • North America - ALASKA BP a �/i /ii %/ i /� i i Operation Summary Report � �% ��. - ; . /7 7 7 Di -ii ;�� Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 I End Date: 3/31/2013 I X4 -OOX5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) - 1 16:00 - 19:30 3.50 CLEAN P DECOMP BEAVER SLIDE OPERATIONS, CLEAN AND CLEAR RIG FLOOR OF BAKER TOOLS. -PJSM, LAY DOWN BAKER TOOLS THROUGH BEAVERSLIDE. -PICK UP LINER RUNNING TOOLS TO RIG FLOOR. 19:30 - 21:00 1.50 RUNCOM P RUNCMP RIG UP TO RUN 38 JTS4- 1/212.6# 1_8 TOP SC PJSM, WITH DOYON CASING CREW ON RIGGING UP FOR LINER RUN. - REVISE TALLY AND DISCUSS WITH CREW AND BAKER COMPLETIONS REPRESENTATIVE. *RECEIVED INSTRUCTIONS FROM WELL ODE TO ADD 1 JOINT TO LINER RUNNING TALLY. 21:00 - 22:30 1.50 RUNCOM P RUNCMP PICK UP 4 -1/2" 12.6# 13 -CR VAM TOP SCAB LINER WITH DOYON CASING CREW. -PJSM, PICK UP FLOAT SHOE, FLOAT COLLAR AND LANDING COLLAR. -BAKERLOK FIRST TWO CONNECTIONS. *FILLED AND CHECKED FLOATS, FLOATS GOOD. 22:30 - 23:00 0.50 RUNCOM N SFAL 126.86 RUNCMP . HAVING ISSUES WITH BACKUP ASSEMBLY ON POWER TONGS. -BACK UPS NOT BITING PROPERLY ALLOWING THE PIPE TO SLIP AND GIVE BAD RESULTS ON TORQUE -N -TURN COMPUTER. -TROUBLE SHOOT, UNABLE TO REMEDY. 23:00 - 00:00 1.00 RUNCOM N SFAL 126.86 RUNCMP MAKE DECISION TO CHANGE OUT TONGS. -PJSM, RIG DOWN POWER TONGS ON RIG FLOOR. -SPOT SPARE POWER TONGS AT BEAVER SLIDE. `OUTER ANNULUS PRESSURE = 0 PSI 3/27/2013 00:00 - 01:30 1.50 RUNCOM N SFAL RUNCMP CONTINUE SWAPPING HYDRAULIC TONGS. I -PJSM, BEAVER SLIDE OPERATIONS. -LOWER BAD SET OF TONGS AND BRING IN BACKUP SET. -WARM UP AND FUNCTION TEST TONGS. 01:30 - 02:30 1.00 RUNCOM N SFAL RUNCMP PULL JOINT # 4 AND CHECK TORQUE WITH BACKUP TONGS. - CONNECTION OVERTORQUED AND EGG SHAPED AT COUPLING AND LOWER JOINT. - BACKED OUT JOINT # 4 AND LAYED DOWN. - PULLED JOINT # 3 OUT OF HOLE AND LAYED DOWN. 02:30 - 05:30 3.00 RUNCOM P RUNCMP CONTINUE RUNNING IN HOLE WITH 35 JOINTS OF 4-1/2" SCAB LINER. -RUN IN HOLE PICKING UP SINGLES FROM PIPE SHED OF 4 -1/2 ", 12.6 #, 13CR -80 CHROME LINER WITH VAM TOP CONNECTIONS FROM -240' TO -1558' FILLING PIPE EVERY 10 JOINTS. Printed 5/20/2013 10:03:49AM • • /. :boa North America - ALASKA - BP, 7/7, Operation Summary Report Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) I Start Date: 3/13/2013 End Date: 3/31/2013 1X4- 00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Let: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 07:30 2.00 RUNCOM P RUNCMP REMOVE COMPENSATOR EQUIPMENT. 1 -PJSM, REMOVE COMPENSATOR SUB FROM TOP DRIVE SWAP OUT BALES AND ELEVATORS. -PJSM, REMOVE 4 -1/2" ELEVATORS AND CASING BALES. - INSTALL TRIPPING BALES AND 5" DRILL PIPE ELEVATORS. MIX PALL MIX AND LET SET FOR 30 MINUTES. CLEAR RIG FLOOR OF ALL TOOLS AND EQUIPMENT NOT NEEDED. *FIRE DRILL HELD, RESPONSE TIME; 1 MINUTE AND 50 SECONDS. 07:30 - 12:00 4.50 RUNCOM P RUNCMP RUN IN THE HOLE WITH 4" DRILL PIPE. -PJSM, RUN IN THE HOLE FROM 1,600' TO 9,200'. -FILL PIPE ON THE FIRST STAND OF DRILL PIPE AT 4 BARRELS PER MINUTE AT 100 PSI. -FILL PIPE EVERY 20 STANDS. - OBTAIN PARAMETERS ON STAND #60, PICK - UP WEIGHT 150 K, SLACK OFF WEIGHT. -PUMP 4 BARRELS PER MINUTE AT 160 PSI. *AVERAGE RUNNING SPEED AT 1 TO 1 -1/2 MINUTES PER STAND. *FLUID LOSS FOR 12 HOUR TOUR 20 BARRELS. `OUTER ANNULUS PRESSURE = 0 PSI 12:00 - 16:30 4.50 RUNCOM P RUNCMP RUN IN THE HOLE WITH LINER, PJSM - BLOW DOWN THE TOP DRIVE. -CONTINUE RUNNING IN THE HOLE WITH DRILL PIPE AND 4.5 12.6 13 -CR VAM TOP LINER FROM 9,200' TO 12,937'. *TOP OF SCAB LINER ASSEMBLY AT 11,345' *FILLING PIPE EVERY 20 STANDS. 16:30 - 18:00 1.50 RUNCOM P RUNCMP MAKE UP CEMENT HEAD. -PJSM, MAKE UP CEMENT HEAD IN MOUSE HOLE. -PICK UP 1 JOINT OF 4" DRILL PIPE AND 15' PUP. -MAKE UP TO CEMENT HEAD WITH 10' PUP WITH CROSSOVER, FOSV, CEMENT HEAD, FOSV, CROSSOVER AND 15' PUP. * *CH2 TRUCK DRIVER TO ENDICOTT MEDIC FOR PAIN IN LOWER BACK @17:50. DRIVER WAS RELEASED BACK TO WORK WITH NO LIMITATIONS AND GIVEN OVER THE COUNTER MEDICATION. 18:00 - 21:00 3.00 RUNCOM P RUNCMP OBTAIN OPERATIONAL PARAMETERS. - CIRCULATE AT 3 BARRELS PER MINUTE WITH 120 PSI. -PICK UP WEIGHT 215 K, SLACK OFF WEIGHT 182 K. - INCREASE PUMP RATE TO 4 BARRELS A MINUTE WITH 450 PSI. Printed 5/20/2013 10:03:49AM • • Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X400X5P -E:RIG (4,632,000.00 ) Project: Endicott I Site: End MPI Rig Name /No.: DOYON 14 ' Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 014757'25.901"W Active datum: Kelly Bushing / Rotary Table ©58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:00 - 00:00 3.00 RUNCOM P RUNCMP CEMENTING SCAB LINER. -PJSM, PRESSURE TEST CEMENT LINES TO 1 250/4500 PSI CHARTED FOR 5 MINUTES EACH -BATCH UP 65 BARRELS OF 15.8PPG CLASS G CEMENT. - SCHLUMBERGER PUMPED 62BBLS OF 15.8PPG CLASS G CEMENT. *RETURNS OBSERVED AFTER 14 BARRELS PUMPED AWAY. *FULL RETURNS OBSERVED DURING REMAINING CEMENT JOB. -FLUSH CEMENT LINES AND DROP DRILLPIPE WIPER PLUG. - SCHLUMBERGER CONTINUE PUMPING 8.8 PPG BRINE AT 6 BARRELS PER MINUTE AT 200 PSI. AT 93 PUMPED PRESSURE INCREASED TO 700PSI. -DRILLPIPE WIPER PLUG LATCHES INTO LINER WIPER PLUG AT 114.5 BARRELS _ PUMPED. - PLUG SHEARED AT 1700 PSI. - SCHLUMBERGER PUMPED ADDITIONAL 22.7 - BARRELS TO BUMP PLUG. TOTAL 137.2 BARRELS TO BUMP LINER WIPER PLUG. *CEMENT IN PLACE AT 23:22 HOURS ON 3/27/2013. *ESTIMATED CALCULATED TOP OF CEMENT AT 10,894'. -SET 40K DOWN AND SET HANGER. - PRESSURE UP TO 4000 PSI AND HOLD FOR 1 MINUTE. -BLEED OFF PRESSURE (1.75 BARRELS BLED). -SET 40K DOWN SECOND TIME TO SET HANGER. - PRESSURE UP TO 4000 PSI AND HOLD FOR 1 MINUTE. -BLEED OFF PRESSURE (1.75 BARRELS BLED). -SET 70K DOWN TO CONFIRM HANGER SET -GOOD. - CONFIRM 0 PRESSURE ON CEMENT LINES, RIG DOWN HOSE TO CEMENT HEAD, BLOW BACK AIR TO SCHLUMBERGER TO CLEAR LINE TO CEMENT UNIT. *OUTER ANNULUS PRESSURE = 0 PSI 3/28/2013 00:00 - 00:15 0.25 RUNCOM P RUNCMP SET "ZXP" PACKER. - ROTATE STRING AT 25 RPM'S AND LOWER TO 70K DOWN TO SET PACKER. - OBSERVED PACKER SHEAR WITH 45K DOWN. -UNSTING FROM LINER. Printed 5/20/2013 10:03:49AM • • North America - ALASKA - B v ' Operation Summary Repo" " F Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4- 00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI -------- - - - - -= Rig Name /No.: DOYON 14 Spud Date/Time. 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:15 - 01:30 1.25 RUNCOM P RUNCMP CIRCULATE OUT CEMENT. -BRING RIG PUMPS UP TO 12 BPM WITH 2000 PSI. AND CLEAN WELLBORE FROM LINER TOP. -AFTER 400 BARRELS PUMPED AWAY SHUT DOWN PUMPS AND SHUT LOWER PIPE RAMS AND OPENED INNER ANNULUS VALVE CONNECTED TO INJECTION LINE ROUTED TO ROCK WASHER. - BRING PUMPS BACK UP TO 10 BPM WITH 1750 PSI. AND CIRCULATE ALL CEMENT FROM WELLBORE UNTIL CLEAN. - VERIFY 0 PSI ON ANNULUS AND DRILL PIPE. -OPEN LOWER PIPE RAMS. *NEW ESTIMATED TOP OF CEMENT AND TOP OF LINER AT 11,345'. 01:30 - 02:30 1.00 RUNCOM P RUNCMP REMOVE CEMENT HEAD. -BREAK OUT SINGLE, TWO PUPS AND CEMENT HEAD USED FOR SPACING OUT LINER. -LAY DOWN SAME TO PIPE SHED. 02:30 - 04:30 2.00 RUNCOM P RUNCMP CIRCULATE BOTTOMS UP TO CONFIRM ALL CEMENT REMOVE FROM WELLBORE. -MAKE UP TOP DRIVE AND BRING PUMPS UP TO 10 BPM WITH 850 PSI. -ICP AT 10 BPM AT 1000 PSI. FCP AT 10 BPM AT 900 PSI. - CIRCULATE AND REMOVE REMAINING CARBOLITE FROM WELL WITH NO MORE CEMENT OBSERVED. -PJSM, BLOW DOWN THE TOP DRIVE. - MONITOR WELL FOR TEN MINUTES. - INSTALL STRIPPING RUBBER, AIR SLIPS. *OBTAIN SLOW PUMP RATES. 04:30 - 08:30 4.00 RUNCOM P RUNCMP PULL OUT OF HOLE WITH LINER RUNNING TOOL LAYING DOWN DRILL PIPE. -PJSM, LAY DOWN DRILL PIPE FROM 11,312' TO 7,513'. 08:30 - 09:30 1.00 RUNCOM N RREP 7,513.00 RUNCMP REPAIR CHAIN ON PIPE SKATE. 09:30 - 10:00 0.50 RUNCOM P ■- RUNCMP RIG SERVICE. -PJSM, SERVICE AND INSPECT BLOCKS, DRAW WORKS AND TOP DRIVE. 10:00 - 18:30 8.50 RUNCOM P RUNCMP RUN IN THE HOLE FROM 7,513' TO 7,800'. -PJSM, PULL OUT OF THE HOLE. -LAY DOWN DRILL PIPE SINGLES TO PIPE SHED FROM 7,800' TO LINER RUNNING TOOL. -LAY DOWN LINER RUNNING TOOL AND INSPECT. -LINER RUNNING TOOL CLEAN AND DOGS INDICATED ASSEMBLY FUNCTIONED PROPERLY. -CLEAN AND CLEAR RIG FLOOR AND PREPARE FOR UPCOMING CASING PRESSURE TEST. 'OUTER ANNULUS PRESSURE = 15 PSI AT 13:00 Printed 5/20/2013 10:03:49AM • • North America - ALASKA :W Operation Summary Report ' , % % Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 IX4- 00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 20:30 2.00 RUNCOM P RUNCMP PRESSURE TEST CASING. -PJSM, PRESSURE TEST CASING AGAINST BLIND SHEARS. - PRESSURE UP TO 250 PSI LOW FOR 5 MINUTES AND 3000 PSI HIGH FOR 30 MINUTES. -TOOK 8.9 BARRELS TO PRESSURE UP TO 1 3000 PSI. -BLED BACK 8.6 BARRELS DURING BLEED OFF. SIM -OPS, LOAD PIPE SHED WITH 4-1/2" TUBING JEWELRY. -MAKE UP TCII LANDING JOINT WITH THE HANGER FOR UPCOMING TEST RUN. -MAKE UP TEST JOINT FOR PULLING WEAR RING. *CONTACT WTLAND OBTAIN AUTHORIZATION , TO PROCEED WITH RESULTS OF WELLBORE INTEGRITY TESTING CRITERIA CALCULATOR. * PRESSURED UP TO 3200 PSI., AFTER 15 MINUTES PRESSURE AT 3190 PSI, AFTER 30 MINUTES PRESSURE AT 3185 PSI. 20:30 - 21:00 0.50 RUNCOM P ■ - I RUNCMP RIG DOWN TEST EQUIPMENT PJSM, BLOW DOWN CHOKE AND KILL LINES. PJSM, PULL WEAR RING. 21:00 - 00:00 3.00 RUNCOM P RUNCMP MOBILIZE TOOLS AND EQUIPMENT TO THE RIG FLOOR. -PJSM, BEAVER SLIDE OPERATIONS. i- MOBILIZE HANGER TO RIG FLOOR, HANGER TEST RUN MARKED OFF WITH TAPE. - CAMERON WELLHEAD PERSSONEL VERIFIED HANGER GOOD. -PICK UP TUBULAR HANDLING EQUIPMENT; LONG BAILS, HYDRAULIC TONGS WITH INTRICAL BACK -UPS. - MOBILIZE SCHLUMBERBER SPOOL TO RIG FLOOR. - VERIFIED WITH HALLIBURTON THAT SINGLE LINE ONLY NEEDED FOR "XXO" TYPE SSSV. 'OUTER ANNULUS PRESSURE = 15 PSI AT 22:00 3/29/2013 00:00 - 02:00 2.00 RUNCOM P RUNCMP CONTINUE TO RIG UP TO RUN 4-1/2" VAM TOP COMPLETION. 02:00 - 02:30 0.50 RUNCOM P RUNCMP PJSM WITH NEW CREW COMING ON TOUR WITH ALL THIRD PARTY HANDS. Printed 5/20/2013 10:03:49AM • • • / ice / /e -/% :�i .�i / i iii .*moo % %: %�Z 1 I 8 : ® 8 Common Well Name: 1 -63 A No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4 00XSP -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date I From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 20:30 18.00 RUNCOM P RUNCMP RUN 4 -1/2" 12.6# CR -85 VAM TOP COMPLETION USING COMPENSATOR AND TORQUE -N -TURN. - BAKER -LOK ALL CONNECTIONS UNDER HES "TNT" PACKER. - CHANGE OUT COMPENSATOR CONTROL PANEL. - CHANGE OUT DUMP VALVE ON HYDRAULIC TONGS. RUN IN HOLE PICKING UP SINGLES FROM PIPE SHED AS PER PROGRAM T/ 11,378'. -LAY DOWN JOINT # 11 DUE TO GALLING AND CHANGE OUT COUPLING ON JOINT # 10. - REPLACED JOINT # 11 WITH JOINT # 284. -LAY DOWN JOINT # 186 DUE TO GALLING AND CHANGE OUT COUPLING ON JOINT # 287. - REPLACED JOINT # 186 WITH JOINT # 287. 'OUTER ANNULUS PRESSURE = 15 PSI AT 11:30 - TAGGED NO -GOAT 11,378.30'. 20:30 - 21:00 0.50 RUNCOM P RUNCMP LAY DOWN (3) JOINTS OF TUBING AND PICK UP 19' PUP JOINT. -PICK UP 1 JOINT OF TUBING AND THEN PICK UP THE HANGER. - - TERMINATE THE CONTROL LINE THROUGH THE HANGER. USED 39 STAINLESS STEEL BANDS TOTAL WIRELINE ENTRY GUIDE 14 FEET BELOW TOP OF LINER. -LAND TUBING AT 11369.86 FINAL PICKUP WEIGHT 173K WITH 50K BLOCK WEIGHT FINAL SLACK OFF WEIGHT 143K WITH 50K BLOCK WEIGHT. 21:00 22:00 1.00 RUNCOM P RUNCMP LAND HANGER. t-RUN IN LOCK DOWN SCREWS IN HANGER. -BACK OUT LANDING JOINT. -RIG UP TO PUMP DOWN INNER ANNULUS TAKING RETURNS THROUGH CHOKE MANIFOLD. 22:00 - 00:00 2.00 RUNCOM P RUNCMP PUMP CORROSION INHIBITOR. -PJSM, PUMP DOWN IA WITH 175 BARRELS OF 120 DEGREE 8.8 POUND PER GALLON BRINE AT 5 BARRELS PER MINUTE AT 550 PSI. -PUMP DOWN IA WITH 630 BARRELS OF 120 DEGREE CORROSION INHIBITED 8.8 POUND PER GALLON BRINE. _ 3/30/2013 00:00 - 03:00 3.00 RUNCOM P RUNCMP CONTINUE CIRCULATING CORROSION INHIBITED 8.8 PPG. BRINE. - CONTINUE PUMPING 3 TO 4.5 BBLS/ PER MINUTE WITH 210 PSI. TO 450 PSI. -PUMP 5 BARRELS DOWN TUBING TO FLUSH SEAT FOR BALL AND ROD. -CHECK FOR PRESSURE AND OPEN BLIND SHEARS. - INSTALL LANDING JOINT, DROP BALLAND LROD, LAY DOWN LANDING JOINT. Printed 5/20/2013 10:03:49AM • North America - ALASK Operation Summary Report Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 X4- 00X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor: DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147°57'25.901"W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 03:00 - 05:00 2.00 RUNCOM P RUNCMP PRESSURE TEST TUBING AND CASING. -PJSM, RIG UP AND PRESSURE TEST TUBING TO 3200 PSI. FOR 30 MINUTES. -2 BARRELS PUMPED TO ACHIEVE PRESSURE. -3100 PSI MINIMUM NEEDED TO COMPLETELY SET "TNT" PACKER. -BLEED TUBING PRESSURE TO 1500 PSI. - PRESSURE UP ON AFThtULU.SJ 3 29.0?SL FQR 30 CHARTED MINUTES, - 1 -7 BARRELS PUMPED TO ACHIEVE PRESSURE. *RUN NUMBERS IN TESTING CRITERIA CALCULATOR AND CALL "WTL ". *JIM WILLINGHAM CONTACTED AND APPROVED TO CONTINUE WITH OPERATIONS AT 04:50 HOURS. 05:00 - 05:30 0.50 RUNCOM P RUNCMP BLEED PRESSURE FROM TUBING AND SHEAR "DCR" VALVE. -BLED BACK 6.5 BARRELS. " -CHART INDICATES THAT VALVE HAS SHEARED.-GOOD. -LINED UP AND PUMPED 5 BARRELS DOWN INNER ANNULUS AND OBSERVED RETURNS THROUGH TUBING AT PITS. -LINED UP AND PUMPED 5 BARRELS DOWN TUBING AND OBSERVED RETURNS THROUGH ANNULUS AT PITS. _ 05:30 - 06:30 1.00 RUNCOM P RUNCMP INSTALL TWO WAY CHECK. -PJSM, TEST FROM BELOW TO 1,000 PSI FOR 10 MINUTES, 2.6 BARRELS TO TEST. -TEST FROM ABOVE TO 3,000 PSI FOR 10 MINUTES, .5 BARRELS TO TEST. 06:30 - 08:00 1.50 BOPSUR P RUNCMP PJSM, BLOW DOWN INJECTION LINE, VACUUM OUT THE STACK. -BLOW DOWN THE CHOKE AND KILL LINE. -BLOW DOWN THE MUD PUMPS. 08:00 - 14:00 6.00 BOPSUR P RUNCMP OPEN DOORS TO INSPECT RAMS. -PJSM, CHANGE BOTTOM RAMS TO 2 -7/8" x 5 " - REPLACE TOP RAMS RUBBER ELEMENTS ON 3-1/2" x 6 ". - INSERTS AND TOP SEALS ON BOTH SIDES. - BUTTON UP RAM DOORS. 14:00 - 16:00 2.00 BOPSUR P RUNCMP 1 NIPPLE DOWN BOPE -PJSM, NIPPLE DOWN BOPE STACK. I -PULL MOUSE HOLE, REMOVE FLOW LINE. -PULL PITCHER NIPPLE AND STAND BACK. 16:00 - 18:00 2.00 WHSUR P RUNCMP NIPPLE UP TREE. -PJSM, PICK UP ADAPTER FLANGE. 1 -CAMERON AND SLB SERVICE HANDS RUN CONTROL LINE THROUGH FLANGE AND TERMINATE. - CONTROL LINE TESTED GOOD. - TORQUE ADAPTER FLANGE TO WELLHEAD. _ 18:00 - 20:00 2.00 WHSUR P RUNCMP PRESSURE TEST HANGER VOID. - PRESSURE TEST VOID TO 250 PSI. LOW FOR 5 CHARTED MINUTES AND 5,000 PSI HIGH FOR 30 CHARTED MINUTES -GOOD. - TORQUE UP TREE. Printed 5/20/2013 10:03:49AM • • • North America - ALASKA BP Operation Summary Report / Common Well Name: 1 -63 AFE No Event Type: WORKOVER (WO) Start Date: 3/13/2013 End Date: 3/31/2013 5(4- o0X5P -E:RIG (4,632,000.00 ) Project: Endicott Site: End MPI Rig Name /No.: DOYON 14 Spud Date/Time: 1/27/1989 12:00:00AM Rig Release: 3/31/2013 Rig Contractor DOYON DRILLING INC. UWI: / Lat: 070 °21'07.268 "8 Long: 0147 °57'25.901 "W Active datum: Kelly Bushing / Rotary Table @58.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 21:00 1.00 WHSUR P RUNCMP TEST TREE. -TEST TREE TO 250 PSI LOWAND 5,000 PSI HIGH FOR 5 MINUTES. *BOTH TESTS GOOD AND CHARTED. 21:00 22:30 1.50 WHSUR P RUNCMP I PULL TWO WAY CHECK WITH LUBRICATOR. -PJSM, WITH VALVE CREWAND PICK UP LUBRICATOR AND TEST 250 LOWAND 3,000 PSI HIGH. *BOTH TESTS CHARTED AND GOOD. PULL TWO WAY CHECK. 1 22:30 - 00:00 1.50 WHSUR P RUNCMP FREEZE PROTECT. -PJSM WITH LITTLE RED SERVICES, RIG UP. -LINE UP TO PUMP DOWN INNER ANNULUS AND TO U -TUBE THE DIESEL FREEZE PROTECT BETWEEN IAAND TUBING. - PRESSURE TEST LINES TO 3,000 PSI. 3/31/2013 00:00 - 01:00 1.00 WHSUR , P RUNCMP FREEZE PROTECT. -PJSM, PUMP 140 BARRELS OF FREEZE PROTECTION AT 5 BARRELS PER MINUTE AT 700 PSI, 70 DEGREE DIESEL. -WELL FREEZE PROTECTED WITH DIESEL TO 2036'. 01:00 - 02:30 1.50 -- WHSUR P RUNCMP ALLOW WELL TO U -TUBE. -AFTER 1 HOUR WELL HAD 230 PSI. GAVE IT 15 MORE MINUTES AND STILL HAD 230 PSI. -BLED BACK .8 BARREL TO LITTLE RED I SERVICES. 02:30 - 04:30 2.00 WHSUR P RUNCMP I INSTALL BACK PRESSURE VALVE. -PJSM, INSTALL LUBRICATOR AND TEST TO 250 PSI. & 3000 PSI. FOR 5 CHARTED MINUTES EACH. -RIG DOWN LUBRICATOR AND REMOVE FROM FLOOR. 04:30 - 05:30 1.00 WHSUR P RUNCMP TEST BACK PRESSURE VALVE. -PJSM, TEST BACK PRESSURE VALVE FROM BELOW THROUGH ANNULUS WITH LITTLE RED SERVICES. -TEST TO 1000 PSI. AND CHART FOR TEN MINUTES. -TOOK 3.7 BARRELS TO PRESSURE UP AND 3.5 BARRELS TO BLED DOWN. 05:30 - 07:30 2.00 WHSUR P RUNCMP DRESS TREE AND SECURE. - SECURE CELLAR AND PREP FOR MOVE. -BLOW DOWN ALL LINES, RIG DOWN ALL CIRCULATING LINES, TEE'S AND VALVES. * DOYON 14 RIG RELEASED FROM ENDICOTT 1 -63/ T -22 ON 3/31/2013 AT 07:30. Printed 5/20/2013 10:03:49AM • • END 1 -63, Well History (Post Rig Sidetrack) Date Summary 04/03/13 T /I /O= 120/0/0 Conducted PJSM w /crew; Start barrier list; Barriers= SV & SSV; Installed Lubricator & P.T. to 300 psi /3500 psi for 5 min. each (passed); Pulled 4" CIW "H" BPV #141 @ 114"; Post Doyon 14. 04/08/13 PULLED 4 -1/2" DSSSV FROM HXO SVLN AT 1,500' SLM (1,524' MD). PULLED BALL &ROD FROM RHC @ 11338' SLM. PULLED STA. #7 RK -DGLV FROM 5,474' SLM (5,485' MD). PULLED STA. #8 RKP -SHEAR VLV FROM 3,817' SLM (3,834' MD). SET STA. # 8 RK -LGLV AT 3,817' SLM (3,834' MD). SET STA. #7 SET RK -OGLV AT 5,474' (5,485' MD). PULLED 4 -1/2" RHC PLUG BODY FROM XN NIP AT 11,344' SLM (11,357' MD). DRIFTED TBG & LINER W/ 20' OF 3 -3/8" DMY GUNS & S. BAILER TO POSSIBLE DOG LEG AT 12,757' SLM (recovered 1 cup of what appears to be cement/sand). 05/02/13 T /I /O = 240/110/10. Temp = SI. T & IA FL (eline call in). No AL. Kill line rigged up to top of swab valve. T FL near surface. IA FL @ surface. SV, WV, SSV, MV = C. IA, OA OTG. NOVP. 2130. 05/05/13 INITIAL T /I /O = 100/100/0. RIH W/ PBMS /SCMT TOOL. LOG SCMT FROM TD TO 11,300'. PERFOMED REPEAT PASS FROM 11,600' - 11,200'. POOH AND LAY DOWN FOR THE NIGHT WELL SECURED UPON DEPARTURE. DSO NOTIFIED. 05/06/13 PERFORATING WITH 2.875" PJO 2906, HMX GUNS, 6 SPF, 60 DEG PHASING, PENETRATION = 36" ENTRANCE HOLE = 0.34 ". RUN 1: RIH W/ UPCT/ 20' GUN. SHOT INTERVAL FROM 12580' - 12600'. CCL TO TOP SHOT = 3.5'. CCL STOP DEPTH = 12576.5'. RUN 2: RIH W/ UPCT/ 25' GUN. SHOT INTERVAL FROM 12505' - 12530'. CCL TO TOP SHOT = 4.3'. CCL STOP DEPTH = 12500.7' RUN 3: RIH W/ UPCT/ 20' GUN. SHOT INTERVAL FROM 12485' - 12505'. CCL TO TOP SHOT = 3.5'. CCL STOP DEPTH = 12481.5'. CORRELATED TIE -IN LOG TO REFERENCE LOG HALLIBURTON DUAL LATEROLOG DATED 21 -FEB -1989 OVER INTERVAL 11850' - 12050'. 05/07/13 PERFORATING WITH 2.875" PJO 2906, HMX GUNS, 6 SPF, 60 DEG PHASING, PENETRATION = 36" ENTRANCE HOLE = 0.34 ". RUN 4: RIH W/ HEAD /ERS /SWIVEUUPCT/ 30' GUN SHOT INTERVAL 12392' - 12422', CCL STOP DEPTH = 12387.7'. RUN 5: RIH W/ HEAD /ERS /SWIVEUUPCT/ 20' GUN SHOT INTERVAL 12305' - 12325', CCL STOP DEPTH = 12301.5'. CORRELATED TIE -IN LOG TO REFERENCE LOG SCHLUMBERGER SCMT LOG DATED 05- MAY -2013. 05/08/13 RAN 2' STEM,3.85 NO- GO,SAT DOWN @ 1495'SLM. RAN 4 1/2 QOS SER #QOS- 1,CONTROL OPERATED,SET @ 1495'SLM. RAN 4 1/2 CHECK SET,SAT DOWN @ 1495'SLM,TOOL SHEARED,RDMO. Page 1 of 1 MC 411 EN D1 —63 s.,—... NOTES:1425 READINGS AV 5' - GE 230 - 260 MEE= EVOY VVELLHFAD = MCEVOY PIPIIPIA/L & GAS INJECTORS. WELL REQUIRES A ACTUATOR = BAKER C SSSV"" CHROME TBG "*" CSG FLANGE RATE) INITIAL KB. EI_EV = 55.25 ZI 1 TO 3000 PSI *** BF FLEV = 16.5 J (i."..' I 1524" HXO SVLN , KJ= 3.813" Max Angle = 51* @ 12754' NIN0 GAS LET MANDRELS _ _ . Datum MD= 12435 ST V Rm DEV VLV LATCH FORT DATE Datum TV D = 10000 SS L 8 3834 3811 15 DONE RKP 16 04/08/13 m 7 5485 5232 37 SO RK 20 04/08/13 13-3/8" CSG, 68#, N T80 CY HE, 0= 12.415'1-1 2500' 1 6 6853 6213 45 MAY RK 0 03/25/13 5 7716 6810 48 CMY RK 0 03/25/13 Minimum ID = 3.725" @ 11357' 4 8581 7398 47 DMY Pi< 0 03/25/13 4-112 HES XN NIPPLE 3 9448 7993 45 CMY RI< 0 03/25/13 2 10357 8625 49 CMY I RK 0 03/25/13 19-5/8" CSG, 47#, NT80 X0 TO NT95-FIS NSCC — 10021' X 1 11139 9138 47 CMY 1 FE 0 03/25/13 11217' H4-1/2" HES X NIP, 0 = 3.813" I 11251" H9-5/8" X 4-112" HES 'TNT PKR, 0=3.903' IIIMI OM.1 11281' —14-1/2" HES X fiAP, 13 = 3 813" I 11357' H 4-112" HES XN MP, ID , s , 3.725' 4-1/2' TBG, 12 8#, 13CR-85 VAM TOP, H 11369' 11356' — 9-5/8' X 7" BKRZXP LTP" 0152 bpf, ID= 3.958" I w/ 10' TEBACK SLV, 0 = 6.24 TOP OF 7" LIIR I—L 11549' L e ..., 'AO 11370' H 4-i ir VVLEG, 0= 3.958" , i .,..- .14 9-5(8" CSG, 47#, NT95HS NSCC, 0 = 8.681" — 11790" 0.. re.■ 1-1ELIV011 NOT LOGGED I 1 4. 1 4' I'',40 Fiiipli I ik 4'4 libli,.. 1.10% t Ai r A+ 11372' — 9-5/8" X 7" BKR HMC HGR, ID =- 6.21" PERFORATION Slit/M 3 ARY P5 11378' Hr X 4-1/2" XO, 0= 3_920" :::111, A REF LOG: DLL-GR on 02/21/89 , ■ ,,ii IP lir IVI/ HY RO ANGLE AT TOP FERE; 48* @ 12350' e A , ..., Note. Refer to Production 1)6 for historical pert data . a rit e lir SIZE _SW _CUM/At_ • i - iz , 6T ti Ilir 11414 A i .41 ri r2-7/8 6 12300- 12324 S 08107/07 03/28/1 FIGR, 0 =4 ? IC X 7' T D ■• A IP '2-1/8 , 14 - 324 05/15/93 1 E" 07 IV IC I. IA ' R '2-7/8 6 12305 -12325 0 "05/07/13 12110 Hr MARKE JOINT . A ir ! i Or 5' 4 12389 - 12422 S '02/27/89 "07/09/07 V' IV '4 '2-7/8 6 12391 - 12411 S "07/23/07 "03/28/13 1 . a 1 C 4 , A 0 "2-7/8 6 12392 - 12422 0 '05/07/13 !Iir . 5" 5 12400 - 12420 S "02/26/89 '07/09/07 h. 4 5" 4 12484 - 12528 S "02/27/89 '07/10/07 IV 1. Ap II '2-7/8 6 12485-12505 0 '05/06/13 1 IV 1. 1471 I.,, 5' 5 12495 - 12515 S "02/26189 '07/10/07 ,0 IV 01 1 0 "2-7/8 6 12505 - 12530 0 "05/06/13 trl ■.„, tirl ifi 5" 4 12578 - 12600 S "02/27/89 '07/10/07 it IIii "2-7/8 6 12580 - 12600 0 "05/06/13 Iii7.91 l'I 5" 5 12580 - 12600 S "02/26/89 r07/10/07 14711 I t 4 I. AI J 'X ' 4 12905* PBTO (FLOAT COLLAR) I I I ' # 1 i i P ri ( --I NA lii'llii Air It "i 1 ,44,4 6. 44,444, 4-1/2" SCAB LNR, 12.6#, 13CR-80 VAM TOP — 12822' ' Inreq XO TO L-80 IBT-M Ili 1 Cc i 4 4 13020' SLM H3-3/8" BKR IBP (TAGGED 07/08/07) __„.......__ 4-1/2' SCAB LNR, 12.6#, L-80 BT, -4 12949' .0158 bpf, 0 = 3_958' PBTD H 13109' 7" LNR, 29#, SM-110 SIRS-TKC, .0371 bpf, ID = 6.184"H 13196' DA IE REV BY COMNINTS DATE REV BY CONVENTS 1301COTT UNIT "03/02189 D15 INITIAL COMPLETION 04/23/13 COSJ/VID GLV C/O (04/08/13) Vial: 1-63 / T-22 02/07/97 D15 RWO 05/16/13 AA/ PJC PERFORATIONS (05/07113) FERNIT No: '1890060 02/07/97 1)15 RWO 05/23/13 JU R3C PEFF DEPTH CORRECTION API No: 50-029-21905-00 03/31/13 014 RVVO SEC 36, T12N, R16E, 2213' Fht. & 2213' FE_ 04101/13 PJC CRLG HO CORRECTIONS 04/04/13 SIMMD CORRECTED PKR TYPE BP Exploration (Alaska) ._ , THE STATE °'ALASKA David Reem Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 GOVERNOR SEAN PARNELL Re: Endicott Field, Endicott Oil Pool, 1- 63/T -22 Sundry Number: 313 -019 Dear Mr. Reem: Encl. DATED this day of January, 2013. • Alaska Oil and Gas Conservation Commission %pNNEp FEB 2 6 2913 lgy -oo,6 Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 333 West Seventh Avenue Anchorage, Alaska 99501 -3572 Main: 907.279.1433 Fax: 907.276.7542 1. Type of Request: �'% T...01 N.,, N... • Abandon • Plug for Redrill • Perforate New Pool 0 Repair Well ' • Change Approved Program • Suspend 0 Plug Perforations • 0 Perforate ■ 0 Pull Tubing • Time Extension • Operations Shutdown • Re -Enter Suspended Well • Stimulate 0 Alter Casing • Other 2. Operator Name BP Exploration (Alaska) Inc. 4. Current Well Class • Exploratory • Stratigraphic • Service 5. Permit To Drill Number 189 - 006 . 6. API Numbe 50.029 21905 - 00 - 00 ' 3. Address: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 0 Development 7. If perforating: What Regulation or Conservation Order governs well spacing in this pool? 462 • 8. Well Name and Number: 1- 63/T -22 . Will planned perforations require a Spacing Exception? • Yes 0 No . 9. Property Designatior ADL 034633 & 034636 ' 10. Field / Pool(s): Endicott Field / Endicott Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): 13196' • Total Depth TVD (ft): 10540' • Effective Depth MD (ft): 13109' Effective Depth TVD (ft): 10485' Plugs (measured): 12425', 12440', 13020' Junk (measured): None Casing Length Size MD TVD Burst Collapse Structural Conductor 71' 30" 110' 110' Surface 2461' 13 -3/8" 2500' 2490' 5020 2270 Intermediate 11751' 9 -5/8" 11790' 9603' 6870 4760 Production Liner 1647' 7" 11549' - 13196' 9427' - 10540' 11220 8510 Perforation Depth MD (ft): 12300' - 12422' Perforation Depth TVD (ft) 9966' - 10046' Tubing Size: 4 -1/2 ", 12.6# Tubing Grade: 13Cr80 Tubing MD (ft): 11583' Packers and SSSV Type: 9 -5/8" x 4 -1/2" TIW HBBP -T Packer Packers and SSSV 11488' / 9383' MD (ft) and TVD (ft): 12. Attachments: 0 Description Summary of Proposal 0 BOP Sketch • Detailed Operations Program 13. Well Class after proposed work: • Exploratory • Stratigraphic Development ■ Service 14. Estimated Date for Commencing Operation March 10, 2013 15. Well Status after proposed work: Oil • • WINJ ■ WDSPL • Plugged • Gas • GINJ • GSTOR • Abandoned • WAG • SPLUG • Suspended 16. Verbal Approval: Date Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: David Bjork, 564 -5683 Printed Name: Da Reem Title: Engineering Team Leader Email: David.Bjork@bp.com Signature: / Z � Phone: 564 -5743 Date: /_ /‘ _2 Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 1 Oi q • Plug Integrity tri3op Test • Mechanical Other: E 0 p 1-1-5 .F -i-0 Spacing Exception Required? • Yes • Approved By: A� Sf f�� Integrity Test • Location Clearance Sb p RBDMS JAN 2 8 201 ( / No Subsequent Form Required: /0 _ 4 Q 4. APPROVED MM S Z ' COMMISSIONER THE COMMISSION Date: � " [ 3 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 FTYR1 GTN1 2 L • STATE OF ALASKA • Approved application is valid for 12 months from the date of approval V1-) ! /7_/, 3 REC1 'VED JAN 72013 11 Submit In Duplicate ,4) 1 SBHPS with 3 -hr stop at 11500'md and 1 -hr stop at 11350'md. Set PXX plug in "X" nipple @ 11550'md. 2 CMIT -T x IA to 3,500 psi. MIT -OA to 2,000psi. Record LLR as necessary. 3 Check the tubing and casing hanger lock down screws for free movement. Completely back out LDS and check each lock down screw for breakage (check one at a time). PPPOT -T & IC. 4 Power Jet cut the 4 - / 12.6# chrome tubing 2 ft above the HBBP -T packer (this packer will be milled up during RWO). (Reference Doyon -15 tubing tally of 2/6/96) Post cut CMIT -TxIA to 1,000 -psi 5 Circulate well with KWF (as determined by RWO engineer). FP with diesel through the cut. 6 Set a BPV in the tubing hanger. Secure well. 7 Remove the well house & flow line. Level the pad as needed for the rig. Will likely require two well houses on either side of.End1 -63 to be removed as well ... Doyon-14's Tool- pusher and WSL to confirm. Pre -Rig Work Request: END 1 -63 Expense Rig Workover MASP: 2744 psi Well Type: Producer Estimated Start Date: March 10th, 2013 Intervention Engineer: Noel Nocas 564 -4667 Pad Engineer: Josiah Igwe 564 -4753 Well Objective: Perform a rig work over to install a scab liner to reduce flow line erosion risk and allow the lower flow units within the Kekiktuk K3B and K3C to flow in well END1- 63/T -22. Well History: END1 -63 was originally drilled and completed in January 1988 in the SDI Kekiktuk upper subzones. In February 1997 a rig workover was performed to replace the 3 -1/2" tubing that was in poor condition and restricting flow. It was completed with 4 -1/2" 13 chrome tubing. To date the well remains operable. However, corrosion /erosion of the 7" liner was detected in 2007 and the well currently produces through a sand screen Proposed Procedure 1. MIRU. Pull BPV. Install TWC. Nipple down tree and adapter flange. 2. NU 4 preventer BOP consisting of annular, 3 -1/2" x 6" VBR's, blind shear rams, flow cross and 2 -7/8" x 5" VBRs. Pressure test BOPE 3,500psigh / 250psi low. Test the annular to 3,500 psi. 3. Pull and lay down 4 -1/2" 12.6# 13CR -80 tubing to cut. 4. Mill and retrieve 9- 5/8 "x4 -1/2" TIW HBBP -T Packer 5. Mill and clean to a Target depth of 12950' MD. 6. Run 4 -1/2" 13Cr VamTop Scab Liner and fully cement liner in place °' 7. Change out 9 -5/8" casing hanger packoff 8. Run 4 -1/2" 13Cr -85 VamTop Tubing 9. Set TWC. ND BOPE. NU and test tree. Pull TWC, Freeze Protect, Install BPV. RDMO. 1 Pull BPV, Ball and Rod, RHC plug, Pull SVLN sleeve, install generic gas lift design. 2 Drift and tag 3 Run jewelry log from PBTD through X Nipple in tubing tail 4 Perforate: 12484' ELMD to 12528' ELMD in the F3 12578' ELMD to 12600" ELMD in the F2 5 Install SCSSSV in SVLN Post-rig work: PERFORATION SUMMARY REF LOG: DLL -GR on 02/21/89 ANGLE AT TOP PERF: 48° © 12300' Note: Refer to Production DB for historical pert data ENDICOTT UNIT WELL: 1 -63 / T -22 PERMIT No: '1890060 API No: 50- 029 - 21905 -00 SEC 36, T12N, R16E, 2213' FNL & 2213' FEL DATE REV BY COMMENTS DATE REV BY COMMENTS '03/02/89 D15 INITIAL COMPLETION 08/14/11 WEC/PJC RESET SAND SCRN (7/30/11) 02/07/97 D15 RINO 11/08/11 WRR/ PJC C/O SAND SCREEN (11/02/11) 11/17/10 SDC/JMD REFORMAT WBS (07/11/12) 02/03/12 PJC LEGEND CORRECTIONS 02/16/11 MBIJMO ADDED SSSV SAFETY NOTE 07/10/12 SDC/JMD ADDED ELMD DATE 03/26/11 TA /PJC RESET SAND SCREEN (3/18/1' 07/18/12 DAS /JMD RESET SAND SCRN (7/11/12) BP Exploration (Alas ka) 08/12/11 DW/ JMO H2S SAFETY NOTE )7/10107 11/20/02 12578 - 12579 PERFORATION SUMMARY REF LOG: DLL -GR on 02/21/89 ANGLE AT TOP PERF: 48° © 12300' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn /Sqz DATE 2 -7/8 DATE 12300 - 12324 OU)C i f)8/07I07 r 2-1/8 12314 - 12324 T37/09/07 5 51' 12389 - 12399 67/09/07 2 -718 1: 12391 - 12411 'b7124/07 10000 SS 8118 12400 - 12420 67/09/07 16 12421 - 12422 9131 7773 12484 - 12494 'b7110/07 0 05/06/04 12495 - 12515 t b7/10/07 8484 47 12516 - 12528 )7/10107 11/20/02 12578 - 12579 877/10/07 47 12580 - 12600 1)7/10/07 ST MD TVD DEV VLV LATCH PORT DATE 55.25 3846 3823 16 CC?Cf?§C7C 16 06/08/09 51' 5938 5570 47 1: 0 06/08/09 10000 SS 8118 7080 47 16 06/08109 9131 7773 47 0 05/06/04 10145 8484 47 0 11/20/02 11173 9162 47 24 06/08/09 wa.LHEAD = MCEVOY ACTUATOR= BAI KB EV = 55.25 EV = Angle = 51' @1: Datum MD = 1: Cetum TVD = 10000 SS MCEVOY CONDI I13-3/8" CSG, 68#, L - B 2.415" • -j 2500' j Minimum ID = 3/25" @ 11571' 4 -1/2" HES XN NIPPLE TOP OF 7" LNR 4-1/2" TBG, 12.6#, 13CR - NSCT, 0152 bpf, ID = 3.958" I9 -5/8" CSG, 47 #, NT95HS, ID = 8.681" I I PBTD I 7" LNR, 29 #, SM -110 BTRS -TKC, 0371 bpf, ID = 6.184" 11549' 11583' 11790 13109 13196 END1 -63 SAFETY NOTES: H2S READINGS AVERAGE 230 - 260 PPM ON A/L & GAS INJECTORS. WELL REQUIRES A SSSV. "M -1/2" CHROME TBG 1536' 11488' 11571' I 11583' 12425' • 4-1/7' HXO SVLN, ID= 3.813" ` —ILA RC CMT (07/08/07) 1 GAS LIFT MANDRELS —14-1/2" HES X NIP, ID = 3.813" 9 -5/8" X 4 -1/2" TIW HBBP -T PKR, ID = 3.952" 11550' H4-1/2" HES X NIP, ID = 3.813" I 11571' H 4-1/2" HES XN NIP, ID = 3.725" 4 -1/2" (CHROME) BKR EXCLUDER SAND SCREEN (07/11/12) H4 -112" WLEG, ID = 3.958" I 11585' H ELMO LOGGED 07/23/07 1 12440' H20/40 CARBOLfTE (07/08/07) I 13047' — I FILL (TAGGED 07 /04/07) L1 3020' SLM - - I3 -3/8" BKR IBP (TAGGED 07 /08/07) PERFORATION SU ARY REF LOG: DLL -GR on 02/21/89 ANGLE AT TOP PERF: 48° @ 12300' Note: Refer to Production DB for historical perf data ENDICOTT UT IT VVE L: 1 -63 / T -22 PERMIT No: '1890060 AR No: 50- 029 - 21905 -00 SEC 36, T12N, R16E, 2213' Ffst & 2213' FEL DATE REV BY COMMENTS DATE REV BY COMMENTS x 03102/89 D15 IMTIAL COMPLETION 08/14/11 WEC/PJC RESET SAND SCRN (7/30/11) 02/07/97 D15 RWO 11/08/11 WRR/ PJC CJO SAND SCREEN (11/02/11) 11/17/10 SDC/JMD REFORMAT WBS (07 /11/12) 02/03/12 PJC LEGEND CORRECTIONS 02/16 /11 N13/JMD ADDED SSSV SAFETY NOTE 07/10/12 SDC/JM) ADDED ELK) DATE 03/26/11 TA/PJC RESET SAM) SCREEN (3/18/11 07/18/12 DAS/JfvtD RESET SAND SCRN (7/11/12) BP Exploration (Alaska) 08/12/11 CM// JMD I-12S SAFETY NOTE '07/10/07 12578- 12579 PERFORATION SU ARY REF LOG: DLL -GR on 02/21/89 ANGLE AT TOP PERF: 48° @ 12300' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE x 2 -7/8 DATE 12300 - 12324 0 v)cn0u)OCn(ncoNN 38107/07 ' 2-1/8 12314 - 12324 '07/09/07 ' 5 5462 12389 - 12399 07/09/07 ' 2 -7/8 12 12391 - 12411 '07/24/07 D U) M N 6834 12400 - 12420 707/09/07 12421 - 12422 7706 6800 12484 - 12494 07/10/07 12495 - 12515 '07/10/07 7400 12516 - 12528 '07/10/07 12578- 12579 '07/10/07 12580 - 12600 737/10/07 ST MD TVD DEV VLV LATCH PORT DATE 5 3826 3800 Max ogle = 5462 5200 CkatumM3 12 Datum 7VD= D U) M N 6834 6200 7706 6800 8584 7400 9451 8000 10327 8600 11220 9200 VVELLFEAD = MCEVOY ACTUATOR= BAKER EV = 5 EV = Max ogle = 51 ° @1F CkatumM3 12 Datum 7VD= 10000 SS NEEVOY CSG, 68#, L -80 Bl 2.415" 4-1/2" HES X NIP, I1:3.813" 1 9-5/8" HES TNT Packer 1 .0152 bpf, D = 3.958' corn TOP OF 7" LNR 9 -5/8" CSG, 47 #, NT95HS, 13 = 8.681" FBTD 7" LNR, 29#, SM-110 BTRS -TKC, .0371 bpf, D = 6.184" • 1/0` 2500' (1].398' I 1 11413' 4 - 1/2' TBG, 12.6#, 13CR 85 VamTop:j 11478' 11549' 11790' 13109' 13196' END1 -63 • SAFETY NOTES: H2S READINGS AVERAGE 230 - 260 PPM ON A/L & GAS INJECTORS. WELL REQUIRES A SSSV. "'4 -1/2" CHROME TBG "" 1500' 11428' 11463' 11488' 12800' 13020' SLM • H4-1/2 "SVLN, D= 3.813" GAS LFT MANDRELS H4-1/2" HES X NP, D = 3.813" H4 -1/2" HES XN NP, D = 3.725" 1 9 -5/8" ZXP BAKER C2 LTP & Flexlock 11 Liner Hanger & PBR Minimum ID = 3.725" @ 11571' 4 -1/2" HES XN NIPPLE 4 -1/2" 12.6# 1367 -80 H3-3/8" BKR IBP (TAGGED 07/08/07) • • -- M MINIMUM is °Q 41 NIMMONS mommolor 1110 3 1/8' 5000 PSI 510E OUTLET . 41 13 5/8', 5000 P51, 14' MPL OPERATORS, HYDPoL BOND SHEAR RAA1 STUDDED BOTTOM 8X 160 ■ �- 3 1/8' 5000 P51 HCR VALVE 3 1/8" 5000 PSI GATE VALVE 2' KLL LINE III,I 4 II j1III /ILL A, /II 3 I/8 50D0 P51 HCA VALVE 3 I /5' 5000 PSI GATE VALVE 3 CHOKE UNE RIG FLOOR 33.7 AGL BOP STACK ELEVATION 16' 150 P51 HYOR. OPERATED KNIFE GATE VALVE SURFACE DIVERTER CONFIGURATION 13 5/8', 5000 P51, HYORIL ANNULAR BOP, STUDDED TOP /RNICED BOTTOM FLANGED TOP 13 5/8', 5000 P51, 10' MPL OPERATORS, HYDRA. PIPE PAM SINGLE 13 5/8 5000 P5I, 10' MPL OPERATORS, 1RDPoL PPE RAM STUDDED BOTTOM / FLANGED TOP 8X 180 21 1/4', 2000 PSI, MSP 14Y0RIL BOP/ONERTER STUDDED TOP /FANGED BOTTOM FLANGE/RANGE RX 73 ACCUMULATOR: NL SHAFFER, 180 GAL, 6 STATION TRIPLEX PUMP 575 VAC, 30 HP AIR PUMP: 1, NL SHAFFER ACCUMULATOR MANIFOLD 18 BOTTLES, 10 GALLONS EACH NITROGEN BACKUP BOTTLES 01/15/08 5 OMB LEA MAZE BOP STAN 03/05/01 4 OMB 13A UPDATE BOP STOCK 01/31/00 3 DM LTA MO,F CN00ANL INS 12 -20-0C 2 OMB LTA IP0A1E BOP STYX 11 -25 -91 1 4111 LEA MUM 10 51110020 9•0 Wr CESOP1101 VALVE LEGEND 1 2 3 4 5 6 7 BYPASS KILL CHOKE BOTTOM RAMS BLIND RAMS TOP PIPE RAMS ANNULAR O O O BY PASS • • 1500 3000 IP Ma,. 11 iY!;la OPLN CLUS6 • • CHOKE OPEN 6105E • • 1011 REMOTE PANEL IN DOGHOUSE AND UTILITY MODULE 0 RPIRAW NM7IEN cra on PROEM RIG 14 BOP SYSTEM AND CONTROL DATE CIFCMD BY *PROM BY 11/28/98 RPR LEA SCALE OMAN BY OM 1X1. NT5 JTH R14BOPSYS&CONTROL REV. 5 90. BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 22, 2012 Mr. Jim Regg Alaska Oil and Gas Conservation Commission 333 West 7"' Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of Endicott Row 1 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from Endicott Row 1 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my altemate, Gerald Murphy, at 659 -5102. • • Mehreen Vazir BPXA, Well Integrity Coordinator IU i iqq- c)os &VT-, Well Name PTD # API # Initial top of cement Vol. of cement pumped Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na gal END1 -01 /J -19 1880370 50029218010000 1.5 0.3 0.5 9/2/2010 0.85 9/23/2010 END1 -03 / P -16 1951500 50029226018000 4.0 3.5 0.5 9/2/2010 5.10 9/23/2010 END1- 05/0 -20 1861060 50029216050000 0.3 NA 0.3 NA 1.70 9/23/2010 END1 -09 / L -21 1970290 50029217430100 6.0 5.0 0.5 8/28/2010 3.40 9/23/2010 END1 -15 / P -25 1930560 50029223610000 4.0 3.0 0.5 9/2/2010 6.80 9/23/2010 END1 -17 /1-17 1961990 50029221000100 8.0 4.3 0.5 9/2/2010 2.55 9/23/2010 END1- 19/1 -18 1950930 50029225690000 7.0 9.3 0.5 9/2/2010 4.25 9/23/2010 END1 -21 / K-25 1900020 50029220050000 2.5 1.5 0.5 9/2/2010 1.70 9/23/2010 END1 -23 / 0 -15 1941280 50029225100000 12.0 12.5 0.5 9/2/2010 1.70 9/23/2010 END1 -25 / K -22 1970750 50029217220100 5.0 1.5 0.5 9/2/2010 5.10 9/23/2010 END1-27 / P -20 1870090 50029216930000 8.0 4.3 0.5 9/2/2010 2.55 9/23/2010 END1 -29 / M -25 1861810 50029216690000 2.0 1.3 0.5 9/2/2010 1.70 9/23/2010 END1 -31 / M -21 1950720 50029225620000 5.0 1.8 0.5 9/2/2010 13.60 9/23/2010 END1 -33 / L -24 1982550 50029225770200 1.5 0.3 0.5 9/2/2010 3.40 9/23/2010 END1 -35 / 0 -25 1861840 50029216720000 8.0 4.8 0.5 9/2/2010 3.40 9/23/2010 END1 -37 / P -24 1870900 50029217480000 0.5 NA 0.5 NA 4.25 9/23/2010 END1 -39A / N -16 2061870 50029218270100 0.5 NA 0.5 NA 6.80 9/23/2010 END1 -41 / 0 -23 1870320 50029217130000 8.0 5.2 0.5 9/2/2010 4.25 9/23/2010 END1 -43 / P -26 1881050 50029218640000 2.0 0.5 _ 0.5 9/2/2010 3.40 9/23/2010 END1 -45 / 0 -26 1891240 50029219910000 1.5 0.3 0.5 9/2/2010 1.70 9/24/2010 END1 -47A / M -20 1972030 50029216250100 1.0 0.1 0.5 9/2/2010 3.40 9/24/2010 END1 -49 / P -21 1880780 50029218410000 1.0 0.8 0.5 9/2/2010 3.40 9/24/2010 END1-51 / V -20 1921190 50029223040000 1.5 0.3 0.5 9/2/2010 1.70 9/24/2010 END1 -53 / 0 -20 1941120 50029225010000 9.0 4.2 0.5 9/2/2010 1.70 9/24/2010 END1 -55 / R -25 1880210 50029217880000 1.3 0.1 0.5 912/2010 1.70 9/24/2010 END1 -57 / R -23 1881140 50029218730000 3.0 1.3 0.5 9/2/2010 5.10 9/24/2010 END1 -59 / 0 -24 1960220 50029226440000 3.0 1.3 0.5 9/2/2010 0.85 9/24/2010 END1 -61 /0 -20 1941420 50029225200000 8.0 6.8 0.5 9/2/2010 2.55 9/24/2010 9 END1 -63 / T -22 1890060 50029219050000 8.0 4.1 0.5 9/2/2010 2.55 9/24/2010 END1 -65A / N -27 2032120 50029226270100 8.0 5.8 0.5 9/2/2010 3.40 9/24/2010 END1 -67 / T -20 1891140 50029219850000 0.5 NA 0.5 NA 1.70 9/24/2010 EN01 -69 / V -19 1900290 50029220200000 15.0 10.3 0.5 9/2/2010 0.85 9/24/2010 Endicott Row 1 BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) • Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Friday, August 17, 2007 2:16 PM To: 'Preble, Gary B (SAIC)' Subject: RE: Endicott 1- 63/T -22 (189 -006) Gary, Thanks for your call and message. It does appear that something is way wrong with the database. Good luck finding the gremlins. I also appreciate your note to those up north. Accurately entering the information is very important. I look forward to the resolution of the issues. Do you have a suggestion as to how far back the 404s should be checked for accuracy? When did you start using the database? Call or message with any questions. Tom Maunder, PE AOGCC From: Preble, Gary B (SAIC) [mailto:Gary.Preble @bp.com] Sent: Friday, August 17, 2007 2:11 PM To: Maunder, Thomas E (DOA) Subject: RE: Endicott 1- 63/T -22 (189 -006) Tom, I have contacted and requested the people on the slope to qc their entries into the database that I create the Daily Report of Well Operations from. Also I am going to return to creating the Sundries without the aid of the database that I have been using. It seems to have some major problems in downloading the data which in turn is causing everyone needless delays in completing their work. Again 1 am sorry for the inconvenience this has caused. Gary Preble Petroleum Data Management Engineer 5AIC 907 -564 -4944 preb/egbc'bp. com From: Maunder, Thomas E (DOA) [mailto:tom.maunder @alaska.gov] Sent: Friday, August 17, 2007 10:11 AM To: Preble, Gary 6 (SAIC) Cc: Arthur C Saltmarsh Subject: Endicott 1- 63/T -22 (189 -006) 8/20/2007 • Vs) kV\ O> Ccit-rtk44.-e'cr-SQ TVZ;A %■A */■NZ ° Ot ' - q CAS-3a— - CA CO Page 1 of 2 Gary, 1 am reviewing the sundry you submitted for the perforating on this well. You have listed the perforated interval as 12300 -12600 and and 9956 -10162 tvd. This is a gross interval. The perfs added in this work report were 12300 -12324 with 2 runs. I looked back to the most recent work report in our file which was for a "sand back" and squeeze conducted in early July of this year. From that job summary it appears that the two deepest perforated intervals 12484 -12528 and 12578 -12600 were covered by the carbolite with a tagged top at about 12440 pre squeeze. The remaining perforations 12314 -12324 and 12389 -12422 were squeezed with the report indicating that 20 bbls of cement squeezed behind pipe of the 40 bbls pumped. The well was cleaned out wit coil to - 12425 and then some bailing runs were conducted to -14415 (corrected). The work summary in the file ends at that point. Final report date is 7/15/07. A couple of observations /questions. 1. Was there further work conducted in July? Was the well re- perforated then? If so, could you please provide the additional information? I did see the 404 around 7/21, but it appears I did not dig into the detail then. • • Page 2 of 2 2. It appears that the perforation detail is not correct if the perforations were indeed squeezed in July. Regardless of re -pert, it appears that the 2 deeper intervals were not recovered. 3. I don't know the process used to "fill in the boxes" on the 404s. Is it automated and selects the shallowest and deepest pert depth to put on the form? It would appear that some adjustment is needed in order to provide correct information. It is my opinion that the discrete open perforated intervals should be listed. Although it appears that the 404 for this well will need to be resubmitted, let's talk first. Call or message back and we can discuss this. Tom Maunder, PE AOGCC 8/20/2007 1. Operations Abandon Repair Well Plug Perforations Performed: Alter Casing Pull Tubing Perforate New Pool Change Approved Program jJ Operat. Shutdown Perforate Stimulate Waiver Other • Time Extension -enter Suspended Well . Q ueS CO AS on nc ora ae .i Re 2. Operator BP Exploration (Alaska), Inc. Name: 4. Current Well Class: Development Exploratory r Stratigraphic r Service r 5. Permit to Drill Number: 189 -0060 3. Address: P.O. Box 196612 Anchorage, AK 99519 -6612 6. API Number: 50- 029 - 21905 -00 -00 - 7. KB Elevation (ft): 55.3 KB 9. Well Name and Number: 1- 63/T -22 - 8. Property Designation: ADLO- 034636 10. Field /Pool(s): ENDICOTT Field/ ENDICOTT OIL Pool . 11. Present Well Condition Summary: Total Depth measured true vertical Effective Depth measured true vertical Casing Length Conductor 71' Surface 2461' Intermediate 11751' Liner 1647' Perforation depth: Measured depth: True Vertical depth: Tubing: (size, grade, and measured depth) Packers and SSSV (type and measured 13196 - feet Plugs (measured) Junk (measured) MD TVD Surface - 110' Surface - 110' Surface - 2500' Surface - 2490' Surface - 11790' Surface - 9603' 11549' - 13196' 9427' - 10540' - _ 4 -1/2" 12.6# 13CR80 9 -5/8" Packer tiw 0 o 0 None Collapse 2260 4760 8510 10539.51 ; feet None 13109 feet Burst 5020 6870 11220 Surface - 11583' 11488' 0 o 0 10484.67 feet Size 30" 13 -3/8" 68# L -80 9 -5/8" 47# nt80s 7" 29# SM -110 12300 - 12600 9956 - 10162 depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure 149 4596 767 0 273 0 0 0 0 0 14. Attachments: Copies of Logs and Surveys Run 15. Well Class after proposed work: Exploratory r Development 17 Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil I Gas r WAG r GINJ r WINJ r WDSPL 17. I hereby certify that the foregoing is true and correct to the best Contact Gary Preble of my knowledge. Title Data Management Engineer Sundry Number or N/A if C.O. Exempt: N/A Printed Name Gary Pre; e , / Signature AK // Phone 564 -4944 Date 8/13/2007 STATE OF ALASKA ALAS IL AND GAS CONSERVATION COMMI•N AUG 6 OF SUNDRY WELL OPERATIONS Alaska �;, 2007 Form 10 -404 Revis tl 04/2006 (1 r ((1 t 1 A 1 ',_ AS n 2009 ,,,,geo7 RECEIVED C-ttuk� Submit Original Only 1- 63/T -22 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY • • 8/6/2007 ***Perforate from 12,300 - 12,324 w 2 -7/8" PJ at 6 SPF * ** WELL SHUT -IN ON ARRIVAL. PJSM. MIRU. ** WSR CONTINUED ON 08/07/07 AWGRS * ** 8/6/2007'' * ** WELL FLOWING ON ARRIVAL. * ** (pre adperf) PULLED 4 1/2" QOS (SER# QOS -16) FROM SVLN @ 1,536' MD. RAN 2 7/8" x 10' DUMMY GUN, T.E.L., S- BAILER LOC. TT @ 11,560' SLM + 25' CORRECTION TO 11,585' ELMD TAGGED TD @ 12,360' SLM + 25' CORR TO 12,385' ELMD, S- BAILER (empty) ** *LEFT WELL S /I, NOTIFIED WELL TENDER * ** 8/7/2007 * ** CONTINUED FROM 6- AUG -07 * ** * * *REPERFORATE AFTER SQUEEZE * ** INITIAL T /I /O = 2400/1320/75 RE -PERF IN 2 RUNS INTERVAL 12,300- 12,324 FT WITH 2 -7/8" HSD 6 SPF 60 DEG PHASING POWERJET HMX GUN. RUN 1: PERFORATED 12304 -12324 FT. RUN 2: PERFORATED 12300 - 12304 !' FT. API PENETRATION 27.7 ", ENTRANCE HOLE .36 ", DEVIATION AT PERFORATIONS 48 DEGREES SOFT TAG TD - 13,380 FT AND STICKY UP TO - 13,360'. NO FILL IN BETWEEN GUN RUNS. GRITTY CEMENT ON GUNS. BOTTOM SET OF PERFS FROM 13,391' TO 13,411' APPEARS TO BE COVERED UP. FINAL T /I /O = 2350/1320/75 * ** *JOB COMPLETE * * ** FLUIDS PUMPED BBLS 1 1 DIESEL TOTAL 1. Operations Abandon Repair Well Plug Perforations Stimulated , °ther Q SQUEEZE Performed: Alter Casing Pull Tubing Perforate New Pool Waiver Time Ektension Change Approved Program Operat. Shutdown Perforate Re -enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. Name: 4. Current Well Class: Development Exploratory r Stratigraphic r Service r 5. Permit to Drill Number: 189 -0060 - 6. API Number: 50- 029 - 21905 -00 -00 ' 3. Address: P.O. Box 196612 Anchorage, AK 99519 -6612 7. KB Elevation (ft): 9. Well 55.3 KB ' Name and Number: 1- 63/T -22 8. Property Designation: ADLO- 034636 ' 10. Field /Pool(s): ENDICOTT Field/ ENDICOTT OIL Pool 11. Present Well Condition Summary: Total Depth measured 13196 ' feet Plugs (measured) None true vertical 10539.51 - feet Junk (measured) None Effective Depth measured 13069 feet true vertical 10459.45 feet Casing Length Size MD TVD Burst Collapse Conductor 71' 30" Surface - 110' Surface - 110' Surface 2461' 13 -3/8" 68# L -80 Surface - 2500' Surface - 2490' 5020 2260 Intermediate 11751' 9 -5/8" 47# NT 80S Surface - 11790' Surface - 9603' 6870 4760 Liner 1647' 7" 29# sm -110 11549' - 13196' 9427' - 10540' 11220 8510 Perforation depth: Measured depth: 12314 - 12600 CANNED JUL 2 3 2007 True Vertical depth: 9975 - 10162 - Tubing: (size, grade, and measured depth) 4 -1/2" 12.6# 13CR80 Surface - 11583' Packers and SSSV (type and measured depth) 9 -5/8" packer tiw 11488' 0 0 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): RBDMS BFL JUL 2 3 NV Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure 504 9664 8648 0 391 SHUT IN 0 0 0 0 14. Attachments: Copies of Logs and Surveys Run 15. Well Class after proposed work: Exploratory r Development Service r Daily Report of Well Operations X 16. Well Status after proposed work: Oil IV Gas r WAG r GINJ r WINJ r WDSPL E ' 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: AlVi9 Contact Joe Turak Printed Name Joe Turak Title Geologist Signature Phone 564 -4204 Date 7/17/2007 STATE OF ALASKA {� `' ALASKA OIL AND GAS CONSERVATION COM *t A ` " REPORT OF SUNDRY WELL OPERATIONS r .. Form 10 -404 Revised 04/2006 iHirwAi NECH IED ;33( r Q l � l u�r i rigjnal Only 1- 63/T -22 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY UMI 7/6/2007 T/1/0= 2050/2100/20 Temp= S/I Assist Slick line as directed, MIT IA * *PASSED ** to 1500 psi. Pumped down IA, 5 bbls. neat meth spear followed by 534 bbls. 1°/0 KCL capped with 80 bbls. diesel for freeze protect. Pressured up IA to 1500 psi w/ 14 bbls diesel. IA lost 0 psi in 30 min test. Unable to bleed due to gas. Final WHP's= 1920/1500/40 7/6/2007 ** *CONTINUED FROM 7 -5 -07 WSR * ** (pre sqz) SET RM- DGLV's IN ST# 5 @ 5,938' MD AND ST. #4 @ 8118' MD. LRS LOADED AND F/P IA WITH, 534 BBLS 1 % KCL, AND 80 BBLS OF DIESEL. PULLED 4 1/2" S.S. CATCHER (empty) FROM 8187' SLM. 'WELL LEFT S/I ON DEPARTURE, NOTIFIED PAD OPERATOR. * ** 7/8/2007! MIRU CTU #5. ** *Job scope: Sand back, acid, cement squeeze * ** MU MHA w/ 3" BDN. Kill well w. 346 bbls 2% KCL while RIH Tag TD @ 13031' CTM +16' correction = 13047' ** *Continue job on 7/9/2007 * ** 7/9/2007 CTU #5 ** *Continue job from 7/8/2007 * ** Load backside of CT w/ 65 bbls of Diesel. Lay in 13052 Ibs of 20/40 carbolite from 13,027'. Park CT and wait 2 hrs. RIH and tag sand top @ 12,540'. Pump additional 1785 Ibs of carbolite. Wait 2 hours. Final tag at 12,440' (20' high). Unable to reverse out due to low bottom hole pressure. Contacted APE to discuss options. OK to proceed. Perform acid stim per procedure. Re -tag carbolite PUH 10' and paint flag at 12,430'. Perform cement squeeze per procedure. 48 bbls LARC cement pumped. Squeezed 20 bbls behind pipe and held 2500 differential. Grease port on hydraulic actuator on '. wing started to leak and caused problems during time to hold 2500 psi on cement. All looked good down hole and bled WHP to 300 psi /565 psi over on formation. Cleaned out cement down to 12425' and laid in TEA across perfs. POOH @ 80% washing jewelry on way out. ** *Continue job on 7/9/2007 * ** 7/10/2007 "; CTU #5 ** *Continue job from 7/9/2007 * ** POOH @ 80 % washing GLM's Freeze protected well from 200' w. Diesel leaving 523 psi on wellhead. ** *Job Complete * ** 7/14/2007' * ** WELL S/I ON ARRIVAL. * ** (post sqz) RAN 3 3/8" X 11' DUMMY GUN, T.E.L, S- BAILER TO 12,389' SLM + 26' CORR. TO 12,415' CORRECTED ELMD (S- BAILER FULL OF WHAT APPEARS TO BE FORMATION SAND) (TARGET DEPTH = 12,420') RIH W/ 3" X 10' P- BAILER IN PROGRESS ** *CONTINUED ON 7 -15 -07 WSR * ** 7/15/2007; ** *CONTINUED FROM 7 -14 -07 WSR * ** (post sz) RAN 3" X 10' PUMP BAILER SD @ 12,392' SLM, RECOVERED ABOUT 1 GALLON OF WHAT APPEARS TO BE CEMENT SET 4 1/2" SLIPSTOP CATCHER SUB @ 5998' SLM. PULLED RM- DGLV's FROM ST. #6 & 5 .SET (GENERIC DESIGN) LGLV ST. #6 @ 3846' MD & S/O GLV ST. #5 @ 5938' MD. PULL SLIPSTOP CATCHER (empty) @ 5,998' SLM RAN 3" X 10' P- BAILER SD @ 12,394' SLM, BAILED ABOUT 1 1/2 GALLONS OF WHAT APPEARS TO BE CEMENT TO 12,395' SLM IH W/ 3" X 10' P- BAILER IN PROGRESS BBLS 346 XS 2% KCL 91 DIESEL 447 TOTAL 1- 63/T -22 FLUIDS PUMPED DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 1. Operations performed: Operation shutdown_ Stimulate _X Plugging _ Perforate _ ACID STIMULATION Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator BP Exploration (Alaska), Inc. 5. Type of Well: Development_ Exploratory _ Stratigraphic Service_ 6. Datum elevation (DF or KB feet) RKB 55 feet 3. Address P. O. Box 196612 Anchorage, AK 99519 -6612 7. Unit or Property name Duck Island Unit / Endicott 4. Location of well at surface 2213' FNL, 2213' FEL, Sec. 36, T12N, R16E, UM (asp's258985, 5982204) At top of productive interval 2965' FNL, 880' FEL, Sec. 01, T11N, R16E, UM (asp's 260125, 5976132) At effective depth 3454' FNL, 860' FEL, Sec. 01, T11N, R16E, UM (as (asp's 260131, 5975674) At total depth 3501' FNL, 856' FEL, Sec. 01, T11N, R16E, UM (asp's 260132, 5975596) 8. Well number 1- 63/T -22 9. Permit number / approval number 189 -006 10. API number 50- 029 - 21905 -00 11. Field / Pool Endicott Field / Endicott Oil Pool 12. Present well condition summary Total depth: measured 13196 feet Plugs (measured) Tagged TD @ 13069' (01/21/2003) true vertical 10522 feet Effective depth: measured 13069 feet Junk (measured) true vertical 10459 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 71' 30" Driven 110' 110' Surface 2461' 13 - 3/8" 3529 c.f. Permafrost 2500' 2490' Intermediate 11751' 9 -5/8" 575 c.f. Class 'G' 11790' 9603' Liner 1647' 7" 845 c.f. Class 'G' 11549' - 13196' 9427' - 10540' Perforation depth: measured Open Perfs 12314'- 12324', 12389'- 12422', 12484'- 12528', 12578'- 12600' true vertical Open Perfs 9975'- 9982', 10025'- 10046', 10087'- 10115', 10148'- 10162' V f = Tubing (size, grade, and measured depth) 4-1/2", 12.6 #, 13CR-80 NSCT TBG @ 11583' MD. t v Packers & SSSV (type & measured depth) 9 -5/8" x 4 -1/2" TIW 'HBBP' PKR @ 11488'. '� 03 2 4 -1/2" HXO SSSV Landing Nipple CO 1536' MD. 13. Stimulation or cement squeeze summary Aiasks fir � G�� �;��s. �;u��l►`nfs Anc110ra $ Intervals treated (measured) (see attached) t Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data Oil - Bbl Gas - Mcf Water - Bbl Casing Pressure Tubing Pressure Prior to well operation 01/15/2003 573 2873 7326 337 Subsequent to operation 02/02/2003 693 2669 8298 345 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended _ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. `2' Q C Title: Technical Assistant DeWayne R Schnorr lam.._ _ __"�`T! Date February 06, 2003 Prepared by DeWayne R. Schnorr 564 -5174 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS SCANNED MAR (; 7 2003 ``9f1MS BFL Form 10 -404 Rev 06/15/88 • SUBMIT IN DUPLICATE Fluids Pumped 80 METHANOL WATER 505 SEAWATER 85 2% KCL WATER 10 INHIBITED WATER FOR FLOW LINE 75 12% HCL ACID 12 HEC WITH 20/40 MESH WAX BEADS 767 TOTAL 1- 63/T -22 Description of Work Completed NRWO OPERATIONS 01/21/2003 ACID: DRIFT /TAG; SSSV C/O OR STROKE 01/29/2003 ACID: ACID TREATMENT SUMMARY 01/21/03 ( WELL FLOWING ON ARRIVAL) ( FT 152 DEG. ) DRIFT W/ 3.795 SWAGE, 2' X 1 -7/8" STEM & 3.84" GAUGE RING. SD @ 598' SLM. WORK PAST. SD @ 1501' SLM. RIH W/ 4 1/2" GS & BBE PULLING PRONG. LATCH 4 1/2" BBE SSSV, SN# NBB -41 @ 1508' SLM. POOH. OOH W/ 4 1/2" BBE SSSV. D/T W/ 1' X 2 1/8" STEM, 3.625" SWAGE, TEL & SB FL 2200' SLM ). LOC TTL @ 11542' SLM + 43' = 11585' CORR TO ELMD. TAG TD @ 13026' SLM + 43' = 13069' CORR TO ELMD. 490' RATHOLE. HIT DOWN. POOH. (SB EMPTY ). RIG DOWN. NOTIFIED DSO OF WELL STATUS. WELL PUT ON PRODUCTION. 01/29/03 PERFORM WEEKLY BOP TEST. PUMPED 400 BBLS SW DOWN B/S TO LOAD AND COOL WELL. RU DS ACID PUMPERS. RECIP ACROSS PERFS (12294'- 12620') WITH 37 BBLS 10% HCL (TITRATION = 10.4% IRON LESS THAN 50 PPM), 12 BBLS 30# HEC (500 #20/40 WAX BEADS 170 DEGREE MELT POINT), AND 37 BBLS 10% HCL.. FLUSH WITH 50 BBLS 2% KCL OVERFLUSH. AT SURFACE, PUMPED 10 BBLS INHIBITED 2% KCL WATER DOWN FLOWLINE. WELL WILL REMAIN SHUT -IN UNTIL - 4 AM BEFORE BEGINNING THE FLOWBACK. «< JOB COMPLETED »> 6t ,NNED NAR 0 7 200:3 Page 1 MEMORANDUM TO: Julie Heusser, Commissioner THRU: Tom Maunder, P. L Superviso FROM: John Crisp, Petroleum Inspector Attachments: SVS DIU 5 -20-09 jc NON- CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission A DATE: May 20, 2001 SUBJECT: Safety Valve Tests Duck Island Unit Endicott MPI 1 & 2 May 20 , 2001: I traveled to BP's Duck Island Unit Endicott Field to witness Safety Valve System tests. Mark Souve was BP's Rep. in charge of SVS testing. Testing was conducted in a safe & efficient manner. I witnessed one failure, the SSSV on well 1 -19 failed to pass the DP test. The AOGCC test report is attached for reference. I inspected 25 well houses on MPI Row 1 & 2 w/ no problems witnessed. SUMMARY: I witnessed SVS testing in BP's Endicott Field. 17 wells, 51 components tested.1 failure witnessed. 1.96% failure rate. 25 well houses inspected. SVS DIU 5 -20 -01 jc .fix ^3 ; � al,Pi' :cRa ...._ .� Well Number � s t 3 a s w.: m" L"s f: : f ¢ S 1�$ e'^iT� K - �- X"S� *3. Permit Number °ry '-5 "� : �' sF""" 'a�T�-"t4�c Separ PSI . Fa - .. ...L.p Set PSI w.: Y . ? 3f'C .�+.., r �_i`ea.3.- ..?2�..,. Test Code y^ . ' z + vt , y Test Code '�i ,, •, d5'. ,, Test Code .T..:J V...i..`. Date Passed oil, WAG, GINJ, GAS or CYCLE 1- 01/J19 1880370 235 150 125 P P P OIL 1- 03/P16 1951500 235 150 135 P P P OIL 1- 05/020 1861060 1- 09A/L2 1970290 235 150 130 P P P OIL 1- 15/P25 1930560 1- 17A/I1 1961990 _ 1- 19/118 1950930 235 150 125 P P I 9 OIL 1- 21/K25 1900020 1- 25A/K2 1970750 235 150 150 P P P OIL 1- 27/P20 1870090 235 150 135 P P P OIL 1- 29/M25 1861810 1- 31/M21 1950720 235 150 125 P P P OIL 1- 33B/L2 1982550 235 150 145 , P P P OIL 1- 35/025 1861840 235 150 135 P P P OIL 1- 39/P17 1880630 1- 45/Q26 1891240 1- 47A/M2 1972030 1- 49/P21 1880780 235 150 130 P P P OIL 1- 55/R25 1880210 235 150 145 P P P OIL 1- 57/R23 1881140 235 150 140 P P P OIL 1- 61/Q20 1941420 235 150 135 . P P P OIL 1- 63/T22 1890060 235 150 145 P P P OIL 1- 65/N25 1951880 235 150 150 P P P OIL 2-04/M19 1860820 2- 06/J22 1870180 2- 08/106 1880040 2- 12/Q16 1921170 2- 14/016 1861490 2-18/L16 1900430 2- 20/L15 1900600 2- 26/N14 1880550 _ 2-28/P19 1880860 2- 30A/E1 1981880 2- 32/SN3 1901190 2 36/014 1900240 2- 38 /SN1 1901290 _ 2 -�i. 1941520 _ Operator: BPX Operator Rep: Mark Souve AOGCC Rep: John Crisp Alaska Oil and Gas Conservation Commis n Safety Valve System Test Report Submitted By: John Cris p Date: 5/20/01 Field/Unit/Pad: Endicott DIU MPI Pad Separator psi: LPS 235 HPS Wells: Remarks: RJF 1 /16 /01 17 Components: 51 Failures: 1 Failure Rate: 1.96% ❑ 90 Day Page 2 of 2 SVS DIU 5 -20 -01 jc - ,.�� � .. `l+ -� ;�� 3 = "�'T.i+.""' ra +Ha - 1 � %+ '?3+is- '�'�,y� � .�� �.. ... vY-,. { .. i,2~rs.�-Z.`�'s" �, z =:'ice F..:- �. -` v ~ x C _.s; � i �.: ` '' 5' te �e �s�" 7; - �#.. E9 3 .� ' r �4 � .. . .,3 t Sa: r - SV r'. Well Number Permit Number Separ PSI Set PSI L/P Trip Test Code Test Code Test Code Date Passed oil, WAG, GINJ, GAS or CYCLE 2-42/P13 1881450 _ 2-44A/Q1 1970710 2-46B/S1 1971370 2- 48/013 1951660 2- 50/U08 1930670 235 150 145 P P P OIL 2-52/S14 1870920 _ 2- 56A/EI 1980580 2- 58/S09 1900520 2- 60/1J13 1930830 235 150 130 P P P OIL 2- 62/Q17 1861580 2-68/S17 1880970 5- 01 /SD7 1801200 - Wells: Remarks: RJF 1 /16 /01 17 Components: 51 Failures: 1 Failure Rate: 1.96% ❑ 90 Day Page 2 of 2 SVS DIU 5 -20 -01 jc 1. Operations performed: ❑ Operation Shutdown ❑ Stimulate ❑ Alter Casing ❑ Plugging ❑ Perforate ■ Pull Tubing ■ Repair Well ❑ Other 2. Name of Operator BP Exploration (Alaska) Inc. 5. Type of well: 6. Datum Elevation (DF or KB) KBE = 55.25' // Development ❑ Exploratory ❑ Stratigraphic ❑ Service 7. Unit or Property Name Duck Island Unit /Endicott 3. Address P.O. Box 196612, Anchorage, Alaska 99519 -6612 4. Location of well at surface 2213' SNL, 2213' WEL, SEC. 36, T12N, R16E At top of productive interval 2965' SNL, 880' WEL, SEC. 1, T11N, R16E At effective depth 3454' SNL, 857' WEL, SEC. T11N, R16E At total depth 3524' SNL, 854' WEL, SEC. 1, T11N, R16E 8. Well Number 1- 63/T -22 9. Permit Number / Approval No. 89 -06 10. API Number 50- 029 -21905 11. Field and Pool Endicott Field / Endicott Pool 12. Present well condition summary Total depth: measured 13196 feet Plugs (measured) true vertical 10565 BKB feet Effective depth: measured 13109 feet Junk (measured) true vertical 10485 BKB feet Casing Length Size Cemented MD TVD Structural BKB BKB Conductor 71' 30" Driven 110' 110' Surface 2461' 13 -3/8" 3529 c.f. Permafrost 2500' 2490' Intermediate 11751' 9 -5/8" 575 c.f. Class 'G' 11790' 9603' Production Liner 1647' 7" 845 c.f. Class 'G' 11549'- 13196' 9427'- 10565' RECEIV 12314'- 12324' 12389'- 12422' 12484'- 12528' 12578'- 12600' Perforation depth: measured . true vertical (Subsea) 9920'- 9926', 9970'- 9991', 10032'- 10060', 10093'- 10107' JUL 21 19 Alaska Oil & Gas Cons Commtssl Tubing (size, grade, and measured depth) 4 -1/2" 12.6 # /ft 13CR80 tubing to 11583' 1 Mchoro Packers and SSSV (type and measured depth) 4 -1/2" HXO SVLN at 1536'; 9 -5/8" TIW HBBPT Packer at 11487' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure N A L 14. Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure Oil -Bbl Gas -Mcf Water -Bbl Prior to well operation: Subsequent to operation: 15. Attachments ❑ Copies of Logs and Surveys run 16. Status of well classifications as: ❑ Suspended Service ►� Oil ❑ Gas 4 Daily Report of Well Operations 17. I hereby certify that the for- . • ing is t : Signed _ Steve Shultz 4 � t L _ 4Pk and orrect to the best of my knowledge ► �4 17 Title Senior Drilling Engineer Date 7 Prepared By Name /Number: Kathy Cam oam r, 564 -5122 T STATE OF ALASKA ALASKA' JIB. AND GAS CONSERVATION COh iISSION REPORT OF SUNDRY WELL OPERATIONS Form 10 -404 Rev. 06/15/88 Submit In Duplicate Facility End MPI Well 1- 63/T -22 Rig Doyon 15 Progress Report Page 1 Date 19 May 97 Date/Time Duration Activity 28 Jan 97 19:00 -06:00 11 hr Repaired Draw works 29 Jan 97 06:00 -06:30 1/2 hr Held safety meeting 06:30 -13:30 7 hr Rig moved 100.00 % 13:30 -14:30 1 hr Rigged up Fluid system 14:30 -16:00 1 -1/2 hr Rigged up Drillfloor / Derrick 16:00 -16:30 1/2 hr Rigged up Lubricator 16:30 -17:00 1/2 hr Removed Hanger plug 17:00 -18:00 1 hr Rigged up Choke manifold 18:00 -18:30 1/2 hr Held safety meeting 18:30 -19:30 1 hr Rigged up High pressure lines 19:30 -23:00 3 -1/2 hr Circulated at 11462.0 ft 23:00 -00:00 1 hr Installed Hanger plug 30 Jan 97 00:00 -02:00 2 hr Removed Xmas tree 02:00 -05:30 3 -1/2 hr Rigged up All functions 05:30 -06:00 1/2 hr Installed BOP test plug assembly 06:00 -06:30 1/2 hr Held safety meeting 06:30 -10:00 3 -1/2 hr Tested All functions 10:00 -11:00 1 hr Removed Hanger plug 11:00 -12:00 1 hr Rigged up Tubing handling equipment 12:00 -12:30 1/2 hr Removed Tubing hanger 12:30 -15:30 3 hr Laid down 1500.0 ft of Tubing 15:30 -16:00 1/2 hr Serviced Draw works 16:00 -18:00 2 hr Laid down 11462.0 ft of Tubing 18:00 -18:30 1/2 hr Held safety meeting 18:30 -00:30 6 hr Laid down 11462.0 ft of Tubing 31 Jan 97 00:30 -01:00 1/2 hr Rigged down Tubing handling equipment 01:00 -01:30 1/2 hr Installed Wear bushing 01:30 -03:30 2 hr Made up BHA no. 1 03:30 -06:00 2 -1/2 hr R.I.H. to 3900.0 ft 06:00 -06:30 1/2 hr Held safety meeting 06:30 -07:30 1 hr Serviced Block line 07:30 -11:30 4 hr Singled in drill pipe to 8017.0 ft 11:30 -13:00 1 -1/2 hr R.I.H. to 11454.0 ft 13:00 -13:30 1/2 hr Fished at 11454.0 ft 13:30 -15:00 1 -1/2 hr Circulated at 11454.0 ft 15:00 -18:00 3 hr Pulled out of hole to 415.0 ft 18:00 -18:30 1/2 hr Held safety meeting 18:30 -20:00 1 -1/2 hr Pulled BHA 20:00 -20:30 1/2 hr Made up BHA no. 2 20:30 -23:30 3 hr R.I.H. to 11481.0 ft 23:30 -00:00 1/2 hr Fished at 11481.0 ft 01 Feb 97 00:00 -00:30 1/2 hr Flow check 00:30 -04:00 3 -1/2 hr Pulled out of hole to 415.0 ft 04:00 -05:00 1 hr Pulled BHA 05:00 -06:00 1 hr Made up BHA no. 3 06:00 -06:30 1/2 hr Held safety meeting 06:30 -07:30 1 hr Serviced Block line 07:30 -10:30 3 hr R.I.H. to 11460.0 ft 10:30 -11:00 1/2 hr Serviced Draw works 11:00 -12:30 1 -1/2 hr Circulated at 11493.0 ft 12:30 -20:00 7 -1/2 hr Milled Permanent packer at 11496.0 ft 20:00 - 21:00 1 hr Circulated at 11496.0 ft 21:00 -23:30 2 -1/2 hr Milled Permanent packer at 11496.0 ft 23:30 -01:00 1 -1/2 hr Circulated at 11539.0 ft Facility End MPI Well 1- 63/T -22 Rig Doyon 15 Progress Report Page 2 Date 19 May 97 Date/Time Duration Activity 02 Feb 97 01:00 -04:00 3 hr Pulled out of hole to 398.0 ft 04:00 -05:00 1 hr Pulled BHA 05:00 -06:00 1 hr Made up BHA no. 4 06:00 -06:30 1/2 hr Held safety meeting 06:30 -08:30 2 hr R.I.H. to 11540.0 ft 08:30 -09:30 1 hr Fished at 11540.0 ft 09:30 -10:00 1/2 hr Flow check 10:00 -13:00 3 hr Pulled out of hole to 399.0 ft 13:00 -13:30 1/2 hr Pulled BHA 13:30 -14:00 1/2 hr Serviced Top drive 14:00 -15:00 1 hr Made up BHA no. 5 15:00 -16:30 1 -1/2 hr R.I.H. to 4695.0 ft 16:30 -17:30 1 hr Serviced Block line 17:30 -18:00 1/2 hr R.I.H. to 6000.0 ft 18:00 -18:30 1/2 hr Held safety meeting 18:30 -19:30 1 hr R.I.H. to 11540.0 ft 19:30 -20:00 1/2 hr Fished at 11540.0 ft 20:00 -23:00 3 hr Pulled out of hole to 401.0 ft 23:00 -23:30 1/2 hr Pulled BHA 23:30 -00:30 1 hr Made up BHA no. 6 03 Feb 97 00:30 -03:00 2 -1/2 hr R.I.H. to 11540.0 ft 03:00 -03:30 1/2 hr Fished at 11540.0 ft 03:30 -04:30 1 hr Circulated at 11540.0 ft 04:30 -06:00 1 -1/2 hr Pulled out of hole to 7100.0 ft 06:00 -06:30 1/2 hr Held safety meeting 06:30 -08:00 1-1/2 hr Pulled out of hole to 399.0 ft 08:00 -09:30 1 -1/2 hr Laid down fish 09:30 -11:00 1 -1/2 hr Pulled BHA 11:00 -11:30 1/2 hr Serviced Draw works 11:30 -14:30 3 hr Made up BHA no. 7 14:30 -15:30 1 hr Serviced Block line 15:30 -18:00 2 -1/2 hr R.I.H. to 11500.0 ft 18:00 -18:30 1/2 hr Held safety meeting 18:30 -19:00 1/2 hr R.I.H. to 12981.0 ft 19:00 - 20:00 1 hr Washed to 13099.0 ft 20:00 -06:00 10 hr Filter Brine 04 Feb 97 06:00 -06:30 1/2 hr Held safety meeting 06:30 -08:00 1 -1/2 hr Filter Brine 08:00 -08:30 1/2 hr Flow check 08:30 -12:00 3 -1/2 hr Pulled out of hole to 1575.0 ft 12:00 -13:30 1 -1/2 hr Pulled BHA 13:30 -14:00 1/2 hr Rigged down sub - surface equipment - Retrievable packer 14:00 -17:00 3 hr Ran Drillpipe in stands to 11541.0 ft 17:00 -18:00 1 hr Tested Casing 18:00 -18:30 1/2 hr Held safety meeting 18:30 -20:30 2 hr Laid down 3895.0 ft of Drillpipe 20:30 -23:30 3 hr Pulled Drillpipe in stands to -0.0 ft 23:30 -00:00 1/2 hr Rigged down sub - surface equipment - Retrievable packer 05 Feb 97 00:00 -00:30 1/2 hr Removed Wear bushing 00:30 -01:30 1 hr Rigged up Completion string handling equipment 01:30 -06:00 4 -1/2 hr Ran Tubing to 1100.0 ft (4 -1 /2in OD) 06:00 -06:30 1/2 hr Held safety meeting 06:30 -18:00 11 -1/2 hr Ran Tubing to 5160.0 ft (4 -1 /2in OD) 18:00 -18:30 1/2 hr Held safety meeting Facility End MPI Well 1- 63/T -22 Rig Doyon 15 Progress Report Page 3 Date 19 May 97 Date/Time 18:30 -02:00 06 Feb 97 02:00 -03:00 03:00 -06:00 06:00 -06:30 06:30 -08:00 08:00 -11:30 11:30 -14:00 14:00 -14:30 14:30 -17:00 17:00 -18:00 18:00 -18:30 18:30 -20:30 20:30 -21:00 21:00 -23:00 23:00 -01:30 07 Feb 97 01:30 -02:30 Duration 7 -1/2 hr 1hr 3hr 1/2 hr 1 -1/2 hr 3 -1/2 hr 2 -1/2 hr 1/2 hr 2 -1/2 hr 1hr 1/2 hr 2hr 1/2 hr 2hr 2 -1/2 hr 1hr Activity Ran Tubing to 10057.0 ft (4 -1 /2in OD) Installed SCSSSV nipple assembly Ran Tubing to 11583.0 ft (4 -1 /2in OD) Held safety meeting Installed Hanger assembly Reverse circulated at 11583.0 ft Set packer at 11487.5 ft with 4000.0 psi Installed Hanger plug Rigged down BOP stack Installed Xmas tree Held safety meeting Tested Xmas tree Retrieved Hanger plug Freeze protect well - 35.000 bbl of Diesel Rigged down Fluid system Skid rig 1. Type of Request: Abandon Suspend Operation Plugging Shutdown Re -enter suspended well Stimulate Alter casing Repair well Time extension Change approved program Pull tubing Variance x Perforate Other 2. Name of Operator BP Exploration (Alaska) Inc. 5. Type of Well: Development 6. Datum elevation (DF or KB) KBE = 55.25 feet Exploratory 3. Address P. O. Box 196612, Anchorage, Alaska 99519 -6612 Stratigraphic 7. Unit or Property name Duck Island Unit/Endicott Service 4. Location of well at surface 2213' SNL, 2213' WEL, Sec. 36, T12N, R16E At top of productive interval 2965' SNL, 880' WEL, Sec. 1, T11 N, R16E At effective depth 3454' SNL, 857' WEL, Sec. 1, N11 N, R16E At total depth 3524' SNL, 854' WEL, Sec. 1, Ti 1N, R16E 8. Well number 1- 63/T -22 MPI 9. Permit number 89 -06 10. API number 50-029-21905 11. Field/Pool Endicott Oil Pool 12. Present well condition summary Total depth: measured 13196 feet Plugs (measured) true vertical 10565 BKB feet Effective depth: measured 13109 feet Junk (measured) ORIGINAL true vertical 10485 BKB feet Casing Length Size Cemented Measured 10 True vertical depth BKB Structural Conductor 71' 30" Driven 110' 110' Surface 2461' 13 3/8" 3529 c.f. Permafrost 2500' 2490' Intermediate 11751' 95/8" 575 c.f. Class G 11790' 9603' Production Liner 1647' 7" 845 c.f. Class G 11549' - 13196' 9427' - 10565' Perforation depth: measured 12314' - 12324' ; 12389' - 12422; 12484' - 12528; 12578' - 12600, true vertical (Subsea) 9920' - 9926; 9970' - 9991; 10032' - 10060; 10093' - WE Utill Tubing (size, grade, and measured depth) 3 1/2' 9.2# L -80 TDS tubing with 2 7/8" tailpipe to 11609' JAN 1 5 1997 Packers and SSSV (type and measured depth) 9 5/8" Packer at 11495; 3 1/2 " SSSV at 1565' Alaska Oil & Gas Cons. Commission 13. Attachments Description summary of proposal x Detailed operations program : ■'= l adtch 14. Estimated date for commencing operation January 1997 15. Status of well classification Oil x Gas as: Suspended 16. If proposal was verbally approved Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Uti )'J,;oj421li J Date 01/13/97 FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may Plug integrity BOP Test Location witness clearance required Signea w .I.wN,p I Approval No. t 5, 7_ Mechanical Integrity Test Subsequent form u 10- 4 D Date LI 7 Approved by order of the Commission Original Wawa By Commissioner STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS Form 10 -403 Rev 06/15/88 Approved copy Returned SUBMIT IN TRIPLICATE January 13, 1997 Attn: Mr. B. Wondzell Dear Mr. Wondzell Sincerely, e -mail: D. Szabo D. Wood E. Goebel K. Coyne E.P.C. END PE -Sup BP EXPLORATION Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Mark Sauve Endicott Development Group attachments (2) MAS /mas Attached please find an Application for Sundry Approval for Endicott SDI production well 1- 63/T -22. The well is diagnosed as having a tubing leak causing tubing - inner annulus communication. BP requests that the well be allowed to remain on production until the tubing is replaced via a rig - workover. The intent is to move to 1- 63/T -22 once operations on the current well, 2- 46/R -10 are completed. This is expected to occur before the end of January 1997. Please feel free to contact myself at 564 -5407 or Darrell Wood at 564 -4026 if you require additional information regarding the proposed course of action. xc: 1- 63/T -22 Well File tUCi V. � H01 1 5 1997 Alaska Oil & Gas Cons. Commission Anchorage Background Remedial Actions Recommendation SUNDRY APPLICATION FOR VARIANCE ENDICOTT POOL WELL 1- 63/T -22 January 13, 1997 Well 1- 63/T -22 was drilled and completed in March 1989 as an SDI area subzone 3B /3C producer. The well has a cumulative recovery of 5.7 mm barrels of oil as of January 1997, when tubing - IA communication was first suspected. Current production from well 1- 63/T -22 is approximately 1900 bopd, 47% WC and 9450 GOR, with an estimated 4 mm bbls of oil left to recover. 1- 63/T -22 has not required artificial lift to maintain production at any time during it's production history and the last static pressure measurement (12/12/96) indicated a shut -in bottom hole pressure of 4983 psig @ 10,000' TVDSS. During routine prep -work for a production logging run on January 10, 1997 it was found that pressure on the IA would not bleed off. During the ensuing production logging operations a leak hunt was performed and a tubing leak at about 10,620' MD was discovered. After the logging operations were concluded well 1- 63/T -22 was left on production. At the time the tubing leak was discovered well 1- 63/T -22 was already on the drilling rig backlog, scheduled for a tubing change -out for optimization of wellbore hydraulics. With a confirmed tubing leak the well has now been moved up the drilling rig schedule and will be worked -over after the operations have been completed on the current well. This is expected to occur before end of January 1997. We request well 1- 63/T -22 be allowed to remain on production until workover operations commence. The inner and outer annulus pressures will be monitored on a daily basis. We believe the well may remain in it's current state without compromising safety. Your concurrence is sought. JAN 1 5 1997 Alaska Oil & Gas Cons. Commission Anchorage CO. GUN SPF INTERVAL ATLAS 21 /8" Nt• , t LO cr 1 LO mt •41 II) 12314' - 12324' SOS 5" DPC 12389' - 12399' 12400'- 12420' 12421' - 12422' 12484' - 12494' 12495' - 12515' 12516' - 12528' 12578' - 12579' 12580'- 12600' R.T. ELEV = 55.25' B.F. ELEV = 16.5' MAX. DEV. = 50:1 12600' MD 13 -3/8 ", 68 # /ft, L -80, Btrs Csg I 2500' 1 9 -5/8 ", 47 #/ft NT8OS XO to NT95HS 1 9982' I Mid -joint Tubing leak @ 10,620' TOP OF 7" LINER I 11549' I 9 -5/8 ", 47 # /ft, NT95HS, NSCC 11790' I PERFORATING SUMMARY Ref. Log: DLL -GR (2/21/89) PBTD 7 ", 29 # /ft, SM -110, Btrs -TKC Date 01/13/88 03/9/89 5/15/93 1/12/97 By FH JLH JLH MAS I 13109' I I 13196' I Comments PROPOSED COMPLETION INITIAL COMPLETION ADD PERF LEAK HUNT 1 1 Ir ti 4 ti t t TREE: 4- 1/16" / 5000 psi / McEvoy WELLHEAD: 13 -5/8" / 5000 psi / McEvoy SSSV LANDING NIPPLE OTIS (2.750" I.D.) 3 -1/2 ", 9.2 # /ft, L -80, TDS GLM's (Camco), (1 -1/2 ", "RK ") Latch No. TVDSS MD -BKB #1 #2 #3 #4 #5 #6 3000' 6157' 7955' 8869' 9118' 9223' 3067' 6852' 9474' 10818' 11190' 11342' SLIDING SLEEVE Camco CB -1 (2.813" I.D.) 3 - 1/2" "X" NIPPLE OTIS (2.750" I.D. TIW SBR (12' long) 9 -5/8" PACKER TIW (HBBP) 2 -7/8 ", 6.5#/ft, L -80, TAILPIPE 2 -7/8" 'X' NIPPLE PARKER (2.313" I.D.) 2- 7/8 " 'X' NIPPLE PARKER (2.313" I.D.) 2 -7/8" WLEG Tbg Vol = 100 Bbls. Tailpipe Vol = .66 Bbls. Liner to Top Perf Vol = 26 Bbls. I 1565' I I 11432' I I 11479' I I 11495' 1 1 11539' I I 11571' I 1 11609' 1 ENDICOTT WELL: 1- 63/T -22 API NO. 50 -029- 21905 COMPLETION DIAGRAM STANDARD ALASKA PRODUCTION '1. Operations performed: Operation shutdown Stimulate Plugging Perforate Pull tubing Alter casing Repair well Other_X_ 2. Name of Operator BP Exploration (Alaska) Inc. 5. Type of Well: D evelopment 6. Datum elevation (DF or KB) KBE = 55.25 feet 3. Address P. O. Box 196612, Anchorage, Alaska 99519 -6612 Stratigraphic Property 7. Un it or Pro name p Duck Island Unit/Endicott Service 4. Location of well at surface 2213' SNL, 2213' WEL, Sec. 36, T12N, R16E At top of productive interval 2965' SNL, 880' WEL, Sec. 1, T11N, R16E At effective depth ORIGINAL 4 3 54 SNL, 857' WEL, Sec. 1, N 11 N, R 16E At total depth 3524' SNL, 854' WEL, Sec. 1, Ti 1 N, R16E 8. Well number 1- 63/T -22 MPI 9. Permit number /approval number 89 -06 /Not required 10. API number 50 029-21905 50- 11. Field/Pool Endicott Oil Pool 12. Present well condition summary Total depth: measured 13196 feet Plugs (measured) true vertical 10565 BKB feet Effective depth: measured 13109 feet Junk (measured) true vertical 10485 BKB feet Casing Length Size Cemented Measured depth True v erti_8 l depth Structural /C Conductor 71' 30" Driven 110' 110' Surface 2461' 13 3/8" 3529 c.f. Permafrost 2500' 2490' Intermediate 11751' 9 5/8" 575 c.f. Class G 11790' 9603' Production Liner 1647' 7" 845 c.f. Class G 11549' - 13196' 9427' - 10565' Perforation depth: measured 12314' - 12324'; 12389' - 12422; 12484' - 12528; 12578' - 12600, true vertical (Subsea) 9920' - 9926; 9970' - 9991; 10032' - 10060; 10093' - 10107; FrF1 _ -- .:. k.,, ,., Y Tubing (size, grade, and measured depth) 3 1/2' 9.2# L -80 TDS tubing with 2 7/8" tailpipe to 11609' NOV 2 2 1995 Packers and SSSV (type and measured depth) 9 5/8" Packer at 1 1495; 3 1/2 " SSSV at 1565' ' 1-'3',,,:i Oil & GDS Cons. COMMiSs 1}ni :3nrAge 13. Stimulation or cement squeeze summary Scale Inhibitor Treatment (9/16/95) Intervals treated (measured) 12314' - 12324'; 12389' - 12422; 12484' - 12528; 12578' - 12600, Treatment description including volumes used and final pressure 92 Bbls(9 Bbls scale inh/b + b/s st), 658 Bbis seawater with .2% NE -18 127 Bbls seawater 83 for B tubing eawa plac FWHP = 1700 psia 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation 2233 17933 957 0 724 Subsequent to operation 2317 18890 1042 0 758 15. Attachments Copies of Logs and Surveys run 16. Status of well classification as: Oil X Gas Suspended Service Daily Report of Well Operations 17. I hereby certify that the foregoing is tru d correct Signed c— 'Z - t to the best of my knowledge. Title Senior Technical Assistant II( Date // / Vq,5 Form 10 -4 4 Rev 06/15/88 n ALAbrvA OIL AND GAS CONSERVATION COMMISSI(i STATE OF ALASKA REPORT OF SUNDRY WELL OPERATIONS SUBMIT IN DU'PLIG'ATE LARRY GRANT Date: 10 October 1995 Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE RE: Transmittal of Data ANCHORAGE AK, 99501. Dear Sir /Madam, Enclosed, please find the data as described below: WELL 1- 63/T -22 1- 31/M -21 9 i0 1 ' 1- 33/M -23 9 {J1 # DESCRIPTION Sent by: HAND CARRY 1 GR /CCL FINAL BL +RF Run # 1 1 PLS FINAL BL +RF Run # 1 1 PFC /PERF FINAL BL +RF Run # 1 1 PFC /PERF FINAL BL +RF Run # 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 O� Or F:. to (907) 563443 ' d Received b /� ` Dt :44 .: 4u/, I . ift'Ec 6/ I/ 4f) ECC No. 5958.02 6446.05 6483.03 1. Operations performed: Operation shutdown Stimulated Plugging Perforate `'"� Pull tubing Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc. 5. Type of Well: Development 6. Datum elevation (DF or KB) KBE = 55.25 fee Exploratory 3. Address P. O. Box 196612, Anchorage, Alaska 99519 -6612 sVabSe 7. Unit or Pro name Duck Island U 't/Endicott n 4. Location of well at surface 2213' SNL, At top of productive interval RECEIVED T12N, R16E R 2965' SNL, 880' WEL, Sec. 1, T 11 N, R16E At effective depth AUG 2 5 1993 3454' SNL, 857' WEL, Sec. 1, N11N, R16E At total depth Alaska Oil & Gas Cons. Commissia' 3524' SNL, 854' WEL, Sec. 1, T11N, R16E Anchorage 8. Well number 1-63/T22 MP1 9. Permit umber /approval number 89 -06 /Not required 10. API number 50- 029 -21905 11. Field /Pool Endicott Oil Pool 12. Present well condition summary Total depth: measured 13196 feet Plugs (measured) true vertical 10565 BKB feet Effective depth: measured 13109 feet Junk (measured) true vertical 10485 BKB feet Casing Length Size Cemented Measured depth True via l depth Structural Conductor 71' 30" Driven 110' 110' Surface 2461' 13 3/8" 3529 c.f. Permafrost 2500' 2490' Intermediate 11751' 9 5/8" 575 c.f. Class G 11790' 9603' Production Liner 1647' 7" 845 c.f. Class G 11549' - 13196' 9427' - 10565' Perforation depth: measured 12314' - 12324'; 12389' - 12422; 12484' - 12528; 12578' - 12600', true vertical (Subsea) 9920' - 9926; 9970' - 9991; 10032' - 10060; 10093' - 10107', Tubing (size, grade, and measured depth) 3 1/2' 9.2# L -80 TDS tubing with 2 7/8" tailpipe to 11609' Packers and SSSV (type and measured depth) 9 5/8" Packer at 11495; 31/2 " SSSV at 1565' 13. Stimulation or cement squeeze summary Scale Inhibitor Treatment Intervals treated (measured) 12314' - 12324'; 12389' - 12422; 12484' - 12528; 12578' - 12600', Treatment description including volumes used and final pressure 1 S ur f 345 B ac t an t bIs. seawater with Scale inhibitor, Spacer, 2% CaCI mix and 2% m FWHP = SI 14. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation 2255 3467 967 0 399 Subsequent to operation 2051 l 2920 1057 0 394 15. Attachments Copies of Logs and Surveys run 16. Status of well classification as: Oil � Gas Suspended Service Daily Report of Well Operations - 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Title Senior Technical Assistant ll( Dat Form 04 Rev 06/15/88 H� anN vii AND GAS CONSERVATION ivn wpnmi:.... �ry STATE OF ALASKA A- .. KA OIL AND GAS CONSERVATION COMML....JN REPORT OF SUNDRY WELL OPERATIONS / P/, SUBMIT IN DUPLICA 1. Operations performed: Operation shutdown Stimulate Plugging Perforate_X,_ - -/ !/ Pull tubing Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc. 5. Type of Well: Development _X Exploratory 6. Datum elevation (DF or KB) KBE = 55.25 feet 3. Address P. O. Box 196612, Anchorage, Alaska 99519 -6612 Stradgraphic 7 Property name 7. U o r Duck Island Unit/Endicott Service 4. Location of well at surface 2213' SNL, 2213' WEL, Sec. 36, T12N, R16E At top of productive interval 2965' SNL, 880' WEL, Sec. 1, T11 N, R16E At effective depth 3454' SNL, 857' WEL, Sec. 1, N1 IN, RICE At total depth 3524' SNL, 854' WEL, Sec. 1, T11N, R16E 8. Well number 1- 63/T -22 MPI 9. Permit number /approval number 89 -06 10. API number 50- 029 -21905 11. Field/Pool Endicott Oil Pool 12. Present well condition summary Total depth: measured true vertical 10565 Effective depth: measured true vertical 10485 Casing Length Structural Conductor 71' Surface 2461' 133/8" Intermediate 11751' Production Liner 1647' Perforation depth: measured 12389' - 12422; true vertical (Subsea) 9970' Tubing (size, grade, and measured depth) 3 Packers and SSSV (type and measured depth) 13196 feet Plugs (measured) BKB feet 13109 feet Junk (measured) BKB feet Size Cemented Measured depth True v l depth 30" Driven 110' 110' 3529 c.f. Permafrost 2500' 2490' 9 5/8" 575 c.f. Class G 11790' 9603' 7" 845 c.f. Class G 11549' - 13196' 9427' - 10565' 12484' - 12528; 12578' - 12600, 12314' - 12324' - 9991; 10032' - 10060; 10093' - 10107; 9920' - 9926' 1/2' 9.2# L -80 TDS tubing with 2 7/8" tailpipe to 11609' 9 5/8" Packer at 11495; 31/2 " SSSV at 1565' RECEIVE D JUN 2 41993 Alaska Oil & Gas Cons. Commission and final pressure Anchorage 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation 2181 2297 891 0 347 Subsequent to operation 2355 / 3128 827 0 373 15. Attachments Copies of Logs and Surveys run 16. Status Oil ..X._ of well classification as: Gas Suspended Service Daily Report of Well Operations _g... 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed `;. � 24, a Title Senior Technical Assistant II( DateI & / , Form 10 ,4 4 Rev 06/15/88 STATE OF ALASKA A .. ...)KA OIL AND GAS CONSERVATION COMMIS_.N REPORT OF SUNDRY WELL OPERATIONS / SUBMIT IN D PLICATE 1 DATE /TIME OPERATIONS SUMMARY 0730 MIRU. Post radio silence signs at the entrance to island and next to well site. 0945 Install SSV fusible cap. FWHP = 341 psig. FWHT = 131 deg F. IAP = 1580 psig. OAP = 0 psig. Choke = 104 Beans. Gas lift = 1.9 MMCFPD 0 1597 psi. 1015 Pressure test lubricator to wellhead pressure. 0930 ESTABLISH RADIO SILENCE AND ARM GUNS (Notify security). 0940 SI Well. 1020 RIH with Gun #1 (10 feet). SIWHP = 1350 psig. 1110 Open wing valve and set production choke to 65 beans. 1125 Tie in to CBL dated 2/26/89. All of the depths listed below are from the open hole reference log. FWHP = 420 -520 psig 0 65 /104 bean choke. 1135 Hang gun #1 Top Shot at 12314' MDBKB. 1139 Shoot gun #1 from 12314 - 12324' MDBKB and flow well for 20 -30 minutes. FWHP = 520 psig. 1205 SI well and log collars through sliding sleeve while POH. 1315 OOH. Confirm all shots fired. 1330 A End radio silence. 1340 RDMO. POP. _s3P.;( DATE: 5/15/93 WELL N 1- 63/T -22 BP EXPLORATION REP: Luedke -Chan SERVICE COMPANY: PERFORATION SUMMARY: All intervals were shot using degree phasing and orientated Additional Perforations AWS (Brunner) Endicott Production Engineering Department NOTE: INSURE THAT THE WELL SITE AREA, WELL HOUSE AND PRODUCTION TREE ARE KEPT FREE OF CRUDE OIL, EQUIPMENT LEAKS OR TRASH. CLEAN UP ANY CRUDE /HYDRAULIC OIL LEAKS BEFORE LEAVING THE JOB SITE. GUN INTERVAL(DLL) CBL DEPTH FEET 1 12314 -12324 12314 -12324 10 SUBZONE 3C5 2-1/8" Jumbo Jet III guns at 4 spf, 0 along the low side of the hole. RECEIVED JUN 241993 Alaska Oil & Gas Cons. Comm'ss' Anr.hnnrl@ BP EXPLORATION June 10, 1993 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear AOGCC Representative, Attached in duplicate is detailed information regarding the enclosed well logs for the Endicott Field. Please contact me at 564 -5225 if you have any questions. Sincerely, cd. xjg_Jazi) 4 J = nne L. Haas enior Technical Assistant 11 NOI JLH Enclosures xc: File 06.10 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box • 196812 Anchorage, Alaska 99519-6612 (907) 561-5111 EIVED j SUN 1 1 189,3 Alaska O . a Gas Cons. Co 3- 03/J -33 5/23/93 .111p 3- 41/K -39 5/15/93 - �D - 3- 35/L -36 5/22/93 ▪ 1- 29/M -25 5/24/93 • St 3- 45/M -39 5/20/93 r 2- 14/0 -16 6/1/93 6/4/93 -56 1- 15/P -25 5/14/93 5/14/93 5/17/93 5/17/93 61 4- 08/P -27 5/19/93 • ► 1 - '1 2- 12/0 -16 5/27/93 5/27/93 1 - 63/T - 5/26/93 5/26/93 5/15/93 ��119 1 - 51N - 5/16/93 5/18/93 WELL NAME DATE INTERVALS 13400'- 13670' 13200'- 13655' 11900'- 12264' 13100'- 14071' 29'- 11848' 10350'- 10578' 10350'- 10800' 11950' - 12960' 11950' - 12960' 11700' 12897' 11700' 12897' 13000'- 13676' 10000'- 10300' 9950'- 10318' 12100'- 12700' 11400' - 12200' 11300'- 12500' 12350' - 12600' 12350'- 12600' LOG NAME PFC/CCL PRODUCTION LOGGING PRODUCTION LOGGING PDK - 100 PRODUCTION LOGGING PRODUCTION LOGGING PRODUCTION LOGGING DUAL LATEROLOG - MSFL DLL- MSFL -GR SSTVD LOG CNUGR $EVIGR/CCL PRODUCTION LOGGING PRODUCTION LOGGING PRODUCTION LOGGING PRODUCTION LOGGING GR/CCL PFC/CCL PFC/CCL PFC /CCL RUN NO COMPANY NAME 1 ATLAS 1 ATLAS 1 ATLAS 1 ATLAS 1 ATLAS 1 ATLAS 1 ATLAS 1 SCHWMBERGER 1 SCHUJMBERGER ATLAS 1 ATLAS 1 ATLAS 1 ATLAS 1 ATLAS 1 ATLAS 1 ATLAS 1 ATLAS 1 ATLAS 1 ATLAS It BP EXPLORATION February 10, 1993 Mr. George Wilson Alaska Department of Environmental Conservation Pipeline Coordinator Regional Office 411 W. 4th Ave - Suite 2C Anchorage, Alaska 99501 Annular Injection Permit Permit no. 9240 -DB002 -7H Request for Annular Injection Dear Mr. Wilson: BP Exploration (Alaska) Inc. Post Office Box 196612 Anchorage, Alaska 99519 -6612 Telephone (907) 561 -5111 Effective this date, Prudhoe Bay Drilling would like to add the following Endicott wells to the list of those approved for annular injection in 1993: MPI 2- 16/M -16 $a-1 4 MPI 1- 63/T -22 Asa- Ot' MPI 2-38/SN-01 Rb— )?- MPI 1- 17/SN -02 9 o— l t 0 MPI 2- 32/SN -03 MPI.. 1- 11 /SN -04 C o -151 Enclosed is an updated injection table showing previous injection volumes in these well. Thank you for you consideration in this matter. Please call Karen Thomas as 564 -4305 if you have any questions concerning this report. Sincerely, Erica A. Denman HSE Coordinator, Prudhoe Bay Drilling Co- Operators, Prudhoe Bay Unit ARLJ Alaska, Inc. Ir r RECEI MAR 0 1 199 Alaska 01 & 3 Gas Cons, Commission G' 1 1/4 0 : 1- 3R ENC. ST EN 'SST SR = CL GEC" Ass GEC .. H � STA CHI 'ILE ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510 -0360 Telephone (907) 276 -1215 1993 Annt Tnjection 2 -10 -93 Page 2 KMT /EAD Attachments cc: Leigh Griffin, AOGCC RECEIVED MAR 0 i 1993 Alaska Oil & Gas Cons. Commission Anchorage c_6-0k JOHN BOYLE July 10, 1991 Page 2 WELL 1- 63/T -22 12100' - 13088' STATIC TEMPERATURE SURVEY C,AM00 WELL 2- 04/M -19 9800' - 10680' TDT SCHLUMBERGER WELL 2- 08/K -16 11670' -12038 TEMPERATURE SURVEY HAS WELL 3- 01/N -29 11650'- 12931' PRODUCTION PROFILE GAIVA00 WELL 3- 11/M -30 12695' - 13395' TDT SCHLUMBERGER WELL 3- 21/L -34 12200' - 12850' PRODUCTION PROFILE CAIIAOO WELL 3- 27/M -33 11550' - 12070' STATIC TEMPERATURE SURVEY GMvtO 11500' - 12071' PRODUCTION PROFILE CAV O WELL 3- 33/K -37 12100' - 13284' PRODUCTION PROFILE G A00 2063 /JLH /clt 6/1 0/91 RUN ONE 6/29/91 RUN FIVE 5/24/91 RUN ONE 6/5/91 RUN ONE 6/30/91 RUN THREE 6/1 7/91 RUN ONE 6/11/91 RUN ONE 6/9/91 RUN ONE 6/6/91 RUN ONE 3ittYv0P) t 1 21`)1 •or J��- Com�r�ss� Car s. aska C Gas BP EXPLORATION November 20, 1990 John Boyle Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Boyle: Enclosed please find one sepia and one blueline print for the well logs run in the following Endicott wells: WELL 1- 27/P -20 8/22/90 PERF RUN ONE 9688'- 10690' SCHLUMBERGER WELL 1- 27/P -20 10/20/90 PROD -F RUN ONE 10350' - 10942' CA CO WELL 1- 63/T -22 t0/19/90 PROD -F RUN ONE 12200' - 13098' C,AMK; D WELL 2- 28/P -19 10/26/90 PROD -F RUN ONE 9900'- 10443' GAIVCo WELL 2- 36/0 -14 11/13/90 TUBING CUTTER RWONE 10140'- 10270' SCHLUMBERGER BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519 -6612 (907) 561 -5111 RECEIVED NOV 2 8 1990 Alaska Oil & Gas Cons. Commission Anchorage COLLAR 10140' - 10261' ATLAS WIREUNE WELL 2- 68/S -17 STATIC 10650'- 11100' HRS CAPACITANCE 10295' - 10895' HRS WELL 3- 17/J -30 PROD -R 13300' - 14000' HRS WELL 3- 21/L -34 DUAL STATIC 12625.5'- 12632' SCHLUMBERGER WELL 3- 33/K -37 DUAL STATIC 12944.5' - 12957' SCHLUMBERGER WELL 3- 39/J -39 11/3/90 PROD -R RUN ONE 14000' - 14425' SCHLUMBERGER W LL 4- 20/M -35 10/3/90 PROD -R RUN ONE 11535' - 11850' HRS Sincerely, ,a2e. X/-.687 J aas JLH /Ims cc: File 06.10 11/4/90 RUN ONE 10/1/90 RUN ONE 10/1/90 RUN ONE 10/7/90 RUN ONE 11/10/90 RUN ONE 10/21/90 RUN ONE RECEIVED NOV 2 8 1990 Alaska 011 & Gas Cons. Commission Anchorage WELL 1- 55/R -25 8/12/90 RADIOACTIVE TRACER SURVEY 12950' - 13550' RUN ONE SCHLUMBERGER J STATIC PRESSURE SURVEY 8/12/90 12950' - 13550' RUN ONE SCHLUMBERGER WELL 1- 57/R -23 8/14/90 /TEMPERATURE SURVEY 11486' - 11972' RUN ONE HALLIBURTON LOGGING SERVICES WEL 1- 63/T -22 4 STATIC PRESSURE SURVEY 12436'- 12436' SCHLUMBERGER 4 RADIOACTIVE TRACER SURVEY 12300'- 13082' SCHLUMBERGER 8/13/90 - RUN ONE 8/13/90 RUN ONE WELL 1- 67/T -20 8/12/90 "TEMPERATURE SURVEY 11120'- 11650' RUN ONE HALLIBURTON LOGGING SERVICES WELL 2- 26/N -14 8/12/90 v/ STATIC TEMPERATURE SURVEY 11500' - 12000' RUN ONE CAMCO WELL 2- 28/P -19 8/22/90 V PERFORATION RECORD 10070' - 10436' RUN ONE SCHLUMBERGER WELL 2- 34/P -14 8/1/90 J INJECTION PROFILE WARM BACK 10770'- 10990' RUN ONE CAMCO *TMD 12750' - 14222' Halliburton WELL 1- 63/T -22 *TEMPERATURE SURVEY 12180' - 13093 Run No. 1 Camco WELL 1- 67/T -20 *PRODUCTION PROFILE' 11275' - 11800' RunNo.2 Camco WELL 1- 69N -19 *DUAL LATEROLOG , 11521' - 12994' Run No. 1 0 Halliburton t 4 *SPECTRAL DENSITY ` '14 11524' - 12994' Run No. 1 d Halliburton 9. OW *RFT `t Run No. 1 N Halliburton *CET 3100' - 12898' Run No. 1 Schlumberger *CBT 3100' - 12872' Run No. 1 Schlumberger *PERFORATING RECORD 11125' - 12874 Run No. 1 Schlumberger WELL 2- 04/M -19 *PRODUCTION PROFILE 10300' 10685' Run No. 1 Camco WELL 2- 14/0 -16 *PRODUCTION PROFILE 10300' - 10998' Camco WELL 2- 18/L -16 *DUAL LATEROLOG 10100' - 11428' Atlas Run No. 1 Run No. 1 Run No. 1 N,� BP EXPLORATION July 24, 1989 Dear Mr. Boyle: John Boyle Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519 -6612 (907) 561 -5111 Enclosed please find one sepia and one blueline print for the well logs run in the following Endicott wells: WELL 1- 63/T -22 API No 50 029 21 905 Run No. 2 *PRODUCTION PROFILE 12000'- 12660' 6/7/89 5 inch log scale cased hole well logged by Camco WELL 3-41/K-39 API No 50 029 21 878 Run No.1 *COLLAR LOG 13300' -136 38' 6/12/89 5 inch log scale cased hole well logged by Atlas Wireline Services "•) WELL 3- 01/N -29 API 50 029 21678 Run No.1 *SPINNER HP PRESSURE TEMPERATURE LOG 12280' - 12730' 4/23/89 5 inch log scale cased hole well logged by Halliburton WELL 2- 70/U -15 API 50 029 21899 Run No.2 *PERFORATING RECORD 11190;=12050' 6/19/89 5 inch log scale cased hole well logged by Schlumberger E 1 Oil & teas Cons. Come A� fi O WELL 2- 68/S -17 API 50 029 21858 .. Run No.1 --..._)*PRESSURE BUILD UP SURVEY 10023'- 11200' 3/24/89 no log scale cased hole well PRODUCTION LOG 10600' - 11000' 6/11/89 5 inch log scale cased hole well logged by Schlumberger WELL 1- 27/P -20 API 50 029 21693 Run No.1 ----- *PRODUCTION PROFILE LOG 9900'- 10850' 6/27/89 5 inch log scale cased hole well logged by Camco WELL 2- 22/L -14 API 50 029 21931 Run No.1 '*INJECTION PROFILE LOG 11748' - 12100' 6/14/89 5 inch log scale cased hole well logged by Camco IA/..L 2- 04/M -19 API 50 029 21586 Run No.1 TEMPERATURE LOG 10100'- 10660' 6/13/89 5 inch log scale cased hole well logged by Camco WELL, 2- 08/K -16 API 50 029 21676 Run No.1 PRODUCTION PROFILE LOG 11700' - 12200' 6/9/89 5 inch log scale cased hole well logged by Camco WELL 3- 17/J -30 API 50 029 21946 Run No.1 - --- , *CEMENT EVALUATION LOG 13040' - 14004' 7/3/89 5 inch log scale cased hole well CEMENT BOND LOG 103040' - 14004' 7/3/89 5 inch log scale cased hole well GAMMA RAY - CCL 13100' - 13700' 7/5/89 5 inch log scale cased hole well logged by Schlumberger JIJL Alaska Oil & Gas Cons. Commission Anchorage Sincerely, GD /Ims WELL 4- 50/K -41 API 50 029 21940 Run No.1 & 2 '"'PERFORATING RECORD 13553' - 13564' 6/22/89 Run 1 5 inch log scale cased hole well *PERFORATING RECORD 13260' - 13820' 7/8/89 Run 2 5 inch log scale cased hole well logged by Schlumberger WELL 2- 46/Q -15 API 50 029 21921 Run No.1 *PRODUCTION PROFILE 10600'- 11000' 6/21/89 2 & 5 inch log scale cased hole well - ' *TEMPERATURE SURVEY 10600' - 11100' 6/24 & 25/89 2 inch log scale logged by Otis WELL 3- 17/J -30 API 50 029 21946 Run No.1 *DUAL LATEROLOG MICROSPHERICALLY FOCUSED LOG 13382'- 14102' 3/8/89 2 & 5 inch log scale open hole well *COMPENSATED SONIC LOG 13382' - 14080' 6/29/89 2 & 5 inch log scale open hole well - INDUCTION LATEROLOG 13382' - 14105' 6/29/89 2 & 5 inch log scale open hole well *SPECTRAL DENSITY DUAL SPACED NEUTRON LOG 13382' - 14103' 6/29/89 2 & 5 inch log scale open hole well *FORMATION TEST LOG no depths 6/29/89 no log scale open hole well logged by Halliburton cc: File 06.10 Ejy E D UJL Alaska Oil & Gas Cons. COMMISSIOD AlithOlaie BP EXPLORATION July 5, 1989 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sirs: Enclosed are Bottom Hole Pressure Reports for the following wells in the Endicott Reservoir: Well Name Sincerely, eanne L. Haas Endicott Field - Bottom -Hole Pressure Reports 1- 09/J -18 (Lower) 1- 09/J -18 (Upper) 1 - 09/J - 18 (Flowing Gradient) 1- 63/T -22 2- 04/M -19 2- 14/0 -16 (Lower) 2- 14/0 -16 (Upper) 2- 68/S -17 3- 27/M -33 3- 41/K -39 Date 06 -07 -89 06 -07 -89 06 -07 -89 06 -07 -89 06 -13 -89 05 -13 -89 05 -13 -89 06 -12 -89 05 -23 -89 05 -25 -89 A . k:I & ,: { �^�".� mil �,' �J "4 r -r�. t ., /} �:. • UN�.ifi i•JJ1 i BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519 -6612 (907) 561 -5111 If there are any questions regarding this data, please contact Dave MacDonald at 564 -4697. BP EXPLORATION March 9, 1989 John Boyle Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Boyle: BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519 -6612 (907) 561 -5111 Enclosed please find one sepia and one blueline print for the open hole well logs run in the following Endicott wells: WELL 1- 63/T -22 Sincerely, *DUAL LATEROLOG 11350' - 13044' Run No. 1 *SPECTRAL LITHO - DENSITY COMPENSATED NEUTRON LOG 11790' - 13046' Run No. 1 *FORMATION TESTER WITH REPEAT PRESSURE TEST 12588' - 13196' Run No. 1 Logged by Halliburton Logging Services. t ctf-t ' Gregory N. Dillard G) `r 1-1 \k-v-;(‘ F 10TH �o�,m�s Gas Goo. 1aS a ��1 & AttaloCage BP EXPLORATION April 14,1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Enclosed, in duplicate, is form 10 -407, our Report of Well Completion. This information reflects the current condition and status of the well. Also enclosed are two copies each of daily drilling reports, directional and gyroscopic surveys. The open hole Togs were sent under separate cover on March 9, 1989. R. H. Reiley Drilling Manager RHR /KTH Enclosures (4) Well 1- 63/T -22 MPI (Endicott) cc: John Oldenberg (MB 7 -1) Endicott WIO's w/4 Well File BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519 -6612 (907) 561 -5111 RKO\I E� APFt 1 r (),Q r` Gas Cons. GommissIon Kaska 0�1 fochoraga 1. Status of Well Classification of Service Well OIL ® GAS ❑ SUSPENDED ❑ ABANDONED ❑ SERVICE ❑ 2. Name of Operator BP Exploration 7. Permit Number 89 -06 3. Address P. O. Box 196612, Anchorage, Alaska 99519 -6612 8. API Number 50- 029 -21905 4. Location of well at surface 2213' SNL, 2213' WEL, SEC. 36, T12N, R16E At Top Producing Interval 2965' SNL, 880' WEL, SEC. 1, T11N, R16E At Total Depth LOCATIONS VERIFIED lust 9. Unit or Lease Name Duck Island Unit /Endicott 10. Well Number 1- 63/T -22 MPI 11. Field and Pool Endicott Field /Endicott Pool � ft 3524' SNL, 854' WEL, SEC. 1, T1 1 N, R16E ` 5. Elevation in feet (indicate KB, DF, etc.) KBE - 55.25' 6. Lease Designation and Serial No. ADL 34636 12. Date Spudded 01/27/89 13. Date T.D. Reached 02/22/89 14. Date Comp., Susp. or Aband. 03/01/89 15. Water Depth, if offshore 6 - 12 feet MSL 16. No. of Completions One 17. Total Depth (MD +TVD) 13196' MD / 10540' TVD 18. Plug Back Depth (MD +TVD)19. 13109' MD / 10485' TVD Directional Survey YES ® NO ❑ 20. Depth where SSSV set 1565' feet MD 21. Thickness of Permafros t 1466' 22. Type Electric or Other Logs Run MSFL/DLL/GR, LDT /CNT /GR, RFT 23. CASING, LINER AND CEMENTING RECORD CASING SIZE WT. PER FT. GRADE SETTING TOP DEPTH MD BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 30" Structural Drive Pipe Surface 110' 13 -3/8" 68# NT -80 Surface 2500' 17 -1/2" 3529 cu ft Permafrost 9 -5/8" 47# NT8OS Surface 10021' 12 -1/4" 9 -5/8" 47# NT95HS 10021' 11790' 12 -1/4" 575 cu ft Class G 7" 29# SM110 11549' 13196' 8 -1/2" 845 cu ft Class G 24. Perforations open to Production (MD +TVD of Top and Bottom and interval, size and number) Schlumberger 5" 0 4 spf MD TVDss 12389' - 12422' 9970' - 9991' 12484' - 12528' 10032' - 10060' 12578' - 12600' 10093' - 10107' 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) 3 -1/2" 9.3# 11609' 11495' TDS W/tallpiipe 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 13 -3/8" x 9 -5/8" Down Squeezed Annulus with 120 BBLS Dry Crude. 27. PRODUCTION TEST Date First Production February 27, 1989 Method of Operation (Flowing, gas lift, etc.) Flowing Date of Test Hours Tested PRODUCTION FOR TEST PERIOD • OIL -BBL GAS -MCF WATER -BBL CHOKE SIZE GAS -OIL RATIO Flow Tubing Press. Casing Pressure CALCULATED 24 -HOUR RATE w OIL -BBL GAS -MCF WATER -BBL OIL GRAVITY -API (corr) 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RKO °)4 A Alaska 0it & Gas Cos. GommiSSIOD STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION VI C OMPLET I O N O R RECOMPLE REPORT AND LOG Form 10 -407 Rev. 7 -1 -80 CONTINUED ON REVERSE SIDE 29. GEOLOGIC MARKERS 30. rORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. MEAS. DEPTH TRUE VERT. DEPTH TOP HRZ PUT RIVER TOP KEKIKTUK 11427' ABSENT 12243' 9284' 9872' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Endicott Drilling Engineering Signed / __- - , ±�` I Title Supervisor D ate f INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in -situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24 : If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut -in, Other - explain. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 28: If no cores taken, indicate "none ". Rig: DOYON 15 Well: 1- 63/T -22 Daily Drilling Report -- ENDICOTT January 27, 1989 at 0600 hrs AFE # 717564 API: 50- 029 -21905 0600 Depth: 0' Day: -1 24 - Hour Ftg: 0' Current Operation: Rigging up. Move rig to slot 1 -63. Rig up. Take on spud mud. kL AFE Amount: Current Amount: STANDARD ALASKA PRODUCTION Mud Type: Spud WT: VIS: PV: YP: FL: Solids: Temp: T SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS ‘k...a Gas G© fis. Coo �d� � 0 '‘ . & fis►ctl°iage Rig: DOYON 15 Well: 1- 63/T -22 (MPI) Daily Drilling Report -- ENDICOTT January 30, 1989 at 0600 hrs AFE # 717564 AFE Amount: API: 50- 029 -21905 Current Amount: 0600 Depth: 2,510' Day: 3 72 - Hour Ftg: 2,510' STANDARD ALASKA PRODUCTION Current Operation: POH. Accept rig on Well 1- 63/T -22 @ 0600 hrs. on 1/27/89. Spud well @ 1400 hrs. Drill and survey 17 -1/2" hole to 2,510'. Circulate and condition hole. POH. Run and cement 13 -3/8" casing; shoe @ 2,500'. Mud Type: FW/Lig WT: 9.5 VIS:90 PV: 14 YP: 18 FL: 18 Solids: 10 Temp: 60 cF SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS APL Rig: DOYON 15 Well: 1- 6351 -22 (MPI) Current Operation: POH for motor. Daily Drilling Report -- ENDICOTT January 31, 1989 at 0600 hrs AFE # 717564 API: 50- 029 -21905 0600 Depth: 3,200' Day: 4 24 - Hour Ftg: 690' AFE Amount: Current Amount: STANDARD ALASKA PRODUCTION Rig down casers. Install split speedhead. N/U BOP and test to 3000 psi - OK. RIH with 12 -1/4" BHA. Test casing to 3000 psi - OK. Drill out shoe. Perform leak -off test to 12.0 ppg EMW. Drill and survey 12 -1/4" hole to KOP @ 3,200'. Mud Type: FW/Lig WT: 9.0 VIS: 36 PV: 7 YP: 6 FL: 24 Solids: 4 Temp: 62 T SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS p.sya ijil & has C,01 e 1\,a�ha�a9 Rig: DOYON 15 Well: 1- 63/T -22 (MPI) Daily Drilling Report -- ENDICOTT February 1, 1989 at 0600 hrs 0600 Depth: 3,799' Day: 5 24 - Hour Ftg: 599' AFE # 717564 AFE Amount: API: 50- 029 -21905 Current Amount: Current Operation: Working on top drive. RIH with Dyna -drill motor. Drill with motor to 3,799'. POH. STANDARD ALASKA PRODUCTION Mud Type: Ligno WT: 9.2 VIS: 38 PV: 7 YP: 6 FL: 14.2 Solids: 5 Temp: 72 °F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 14 3688 13.2 S 19E 3671 314 S314 E34 2.3 4 ��� ' fit . P�°���'�a�� Rig: DOYON 15 Well: 1- 63/I' -22 (MPI) Daily Drilling Report -- ENDICOTT February 2, 1989 at 0600 hrs AFE# 717564 API: 50- 029 -21905 0600 Depth: 4,450' Day: 6 24 - Hour Ftg: 651' AFE Amount: Current Amount: STANDARD ALASKA PRODUCTION Current Operation: Drilling 12 -1/4" hole with Dyna -drill motor. Work on top drive. RIH with rotary BHA. Drill to 4,081'. POH. RIH with motor. Mud Type: Ligno WT: 9.2 VIS: 37 PV: 7 YP: 7 FL: 12.9 Solids: 5 Temp: 68 ° SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 17 4017 17° S 10E 3988 402 S398 E56 1.3 19 4228 22.6 S 15E 4186 473 S468 E72 2.9 Rig: DOYON 15 Well: 1- 63/T -22 (MPI) Current Operation: Drilling 12 -1/4" hole. Daily Drilling Report -- ENDICOTT February 3, 1989 at 0600 hrs AFE # 717564 AFE Amount: API: 50- 029 -21905 Current Amount: 0600 Depth: 5,260' Day: 7 24 - Hour Ftg: 810' Drill with motor to 4,876'. POH. RIH with Rotary BHA. Ream motor run. STANDARD ALASKA PRODUCTION Mud Type: Ligno WT: 9.3 VIS: 37 PV: 9 YP: 6 FL: 12.2 Solids: 6 Temp: 70 cF SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 23 5087 36.8 S 12E 4916 921 S903 E184 0.6 BP EXPLORATION Rig: DOYON 15 Well: 1- 63/T -22 (MPI) Current Operation: Drilling 12 -1/4" hole. Drill and survey to 8,315'. Daily Drilling Report -- ENDICOTT February 6, 1989 at 0600 hrs AFE # 717564 API: 50 -029 -21905 0600 Depth: 8,315' Day: 10 72 - Hour Ftg: 775' AFE Amount: Current Amount: Mud Type: Ligno WT: 9.8 VIS: 38 PV: 14 YP: 9 FL: 6.0 Solids: 9 Temp: 72 F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 27 5851 45.6 S 17E 5511 1397 S1363 E310 3.1 35 7394 46.5 S 16E 6592 2494 S2420 E617 0.2 38 8028 47.7 S 13E 7020 2961 S2873 E732 0.1 BP EXPLORATION Rig: DOYON 15 Well: 1- 63/T -22 (MPI) Current Operation: Drilling 12 -1/4" hole. Drill and survey to 8,989'. Mud Type: Ligno WT: 9.9 VIS: 39 PV: 15 SURVEY MD ANGLE DIRECTION 42 8880 47.1 S 17E Daily Drilling Report -- ENDICOTT February 7, 1989 at 0600 hrs AFE # 717564 API: 50- 029 -21905 0600 Depth: 8,980' Day: 11 24 - Hour Ftg: 665' AFE Amount: Current Amount: YP:11 FL: 5.6 Solids:10 Temp: 82 `F TVD SECTION COORDINATES ]BLS 7602 3582 S3477 E882 0.9 Rig: DOYON 15 Well: 1- 63fT -22 (MPI) Current Operation: Drilling 12 -1/4" hole. BP EXPLORAI1ON Drill and survey to 9,320'. Daily Drilling Report -- ENDICOTT February 8, 1989 at 0600 hrs AFE # 717564 AFE Amount: API: 50- 029 -21905 Current Amount: 0600 Depth: 9,320' Day: 12 24 - Hour Ftg: 340' Mud Type: Ligno WT: 9.8 VIS: 37 PV: 10 YP: 6 FL: 5.4 Solids: 9 Temp: 80 P SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 42 9016 47.4 S 15E 7.695 3682 S3574 E904 0.3 BP EXPLORATION Rig: DOYON 15 Well: 1- 63/T -22 (MPI) Current Operation: Drilling 12 -1/4" hole. Drill and survey to 9,740'. Daily Drilling Report -- ENDICOTT February 9, 1989 at 0600 hrs AFE # 717564 API: 50 -029 -21905 0600 Depth: 9,740' Day: 13 24 - Hour Ftg: 420' AFE Amount: Current Amount: Mud Type: FW/Lig WT: 9.9 VIS: 36 PV: 8 YP: 8 FL: 5.4 Solids: 9 Temp: °F SURVEY IVMD ANGLE DIRECTION TVD SECTION COORDINATES DLS 45 9606 44.5 S16E 8103 4106 S3983 E1020 - . 0*J6 BP EXPLORAT)ON Rig: DOYON 15 Well: 1- 63[F -22 (MPI) Current Operation: Drilling 12 -1/4" hole. Drill and survey to 10,010'. Daily Drilling Report -- ENDICOTT February 10, 1989 at 0600 hrs AFE # 717564 AFE Amount: API: 50 -029 -21905 Current Amount: 0600 Depth: 10,010' Day: 14 24 - Hour Ftg: 270' Mud Type: FW/Lig WT: 9.9 VIS: 36 PV: 9 YP: 8 FL: 5.4 Solids: 9 Temp: 92 °F SURVEY ANGLE DIRECTION TVD SECTION COORDINATES DLS 46 9775 44.5 S 16E 8224 4224 S4097 E 105 3 0 r•eA9 BP EXPLORATION Rig: DOYON 15 Well: 1- 63rI' -22 (MPI) Daily Drilling Report -- ENDICOTT February 13, 1989 at 0600 hrs AFE # 717564 API: 50- 029 -21905 0600 Depth: 11462' Day: 17 72 - Hour Ftg: 1452' Current Operation: RIH with bit. Drill & survey 12 -1/4" hole to 11462'. AFE Amount: Current Amount: Mud Type: FW/LIG WT: 10.2 VIS: 42 PV: 16 YP: 14 FL: 4 Solids: 11 Temp: 106 C SURVEY M, ANGLE DIRECTION _ ..TVD SECTION COORDINATES. DLS 49 10309' 48.7 S13E 8591' 4610 S4472 E1153 1.2 51 10743' 49.4 S 12E 8874' 4939 S4793 E1223 0.1 54 11278' 46 SO9E 9232' 5337 S5184 E1298 0.9 Mud Type: FW/LIG SURVEY MD 58 11803 BP EXPLORATION Rig: DOYON 15 Well: 1- 63/T -22 (MPI) ANGLE DIRECTION ' 42.1 SO4E Daily Drilling Report -- ENDICOTT February 14, 1989 at 0600 hrs AFE # 717564 API: 50- 029 -21905 0600 Depth: 11803' Day: 18 24 - Hour Ftg: 341' Current Operation: Rig up to run 9 -5/8" casing. Drill and survey 12 -1/4" hole to 11803'. Circulate and condition hole. POH. WT: 10.2 VIS:40 PV: 14 AFE Amount: Current Amount: YP: 14 FL: 4.2 Solids: 12 Temp: 106 °F TVD SECTION COORDINATES DLa 9611' 5699 S5545 E1335 0.8 BP EXPLORAIIION Rig: DOYON 15 Well: 1- 63a -22 (MPI) Current Operation: RIH. kQ� Daily Drilling Report -- ENDICOTT February 15, 1989 at 0600 hrs AFE # 717564 AFE Amount: API: 50- 029 -21905 Current Amount: 0600 Depth: 11803' Day: 19 24 - Hour Ftg: 0 Run and cement 9 -5/8" casing; shoe @ 11790. P/U 8 -1/2" BHA. Mud Type: LIGNO WT: 9.6 VIS: 38 PV: 8 YP: 6 FL: 5.6 Solids: 8 Temp: cF SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS BP EXPLORATION Rig: DOYON 15 Well: 1- 63/T -22 (MPI) Current Operation: Drilling 8 -1/2" hole. Daily Drilling Report •- ENDICOTT February 16, 1989 at 0600 hrs AFE # 717564 API: 50- 029 -21905 0600 Depth: 11914' Day: 20 24 - Hour Ftg: 111' AFE Amount: Current Amount: RIH. Drill cement in 9 -5/8" casing. Test casing to 3000 psi -OK. Drill out shoe. Mud Type: LIGNO WT: 9.6 VIS: 36 PV: 9 YP: 6 FL: 5.8 Solids: 8 Temp: 94 eF ANGLE DIRECTION TV D SECTION COORDINATES BP !EXPLORATION Rig: DOYON 15 Well: 1- 63/T -22 (MPI) L Current Operation: Drilling 8 -1/2" hole. Trip for bit. Drill to 12100'. Daily Drilling Report -- ENDICOTT February 17, 1989 at 0600 hrs AFE # 717564 AFE Amount: API: 50- 029 -21905 Current Amount: 0600 Depth: 12100' Day: 21 24 - Hour Ftg: 186' Mud Type: LIGNO WT: 9.6 VIS: 36 PV: 9 YP: 6 FL: 5.8 Solids: 8 Temp: `F ,SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS Rig: DOYON 15 Well: 1- 63/T -22 (MPI) Current Operation: Drilling 8 -1/2" hole. BP EXPLORATION Drill and survey to 13000'. Daily Drilling Report -- ENDICOTT February 20, 1989 at 0600 hrs AFE # 717564 AFE Amount: API: 50- 029 -21905 Current Amount: 0600 Depth: 13000' Day: 24 72 - Hour Ftg: 900' Mud Type: LIGNO WT: 9.6 VIS: 36 PV: 11 YP: 8 FL: 5.8 Solids: 8 Temp: 106 P SURVEY MD ANGLE, DIRECTION TVD SECTION COORDINATES DLS BP EXPLORATION Rig: DOYON 15 Well: 1- 63,T -22 (MPI) Current Operation: Conditioning hole. Daily Drilling Report -- ENDICOTT February 21, 1989 at 0600 hrs AFE # 717564 API: 50- 029 -21905 0600 Depth: 13196' Day: 25 24 - Hour Ftg: 196' Drill 8 -1/2" hole to TD @ 13196'. AFE Amount: Current Amount: Mud Type: LIGNO WT: 9.8 VIS: 37 PV: 11 YP: 11 FL: 5.9 Solids: 10 Temp: 104 °F SURVEY ID ANGLE DIRECTION TVD SECTION COORDINATES DLS BP EXPLORAflON Rig: DOYON 15 Well: 1- 63/T -22 (MPI) Current Operation: POH w/RFT. Daily Drilling Report -- ENDICOTT February 22, 1989 at 0600 hrs AFE # 717564 API: 50 -029 -21905 0600 Depth: 13196' Day: 26 24 - Hour Ftg: 0 AFE Amount: Current Amount: Condition hole. Run open hole logs: DLL/MSFL /GR, LDT /CTN /GR, RFT. Mud Type: LIGNO WT: 9.8 VIS: 40 PV: 13 YP: 11 FL: 5.9 Solids: 10 Temp: `F SURVEY iD ANGLE DIRECTION TVD SECTION COORDINATES al Y�L BP EXPLORATION Rig: DOYON 15 Well: 1- 631r -22 (MPI) Current Operation: RIH w/7" liner. Daily Drilling Report -• ENDICOTT February 23, 1989 at 0600 hrs AFE # 717564 API: 50- 029 -21905 0600 Depth: 13196' Day: 27 24 - Hour Ftg: 0 Make wiper trip. Circulate and condition hole for 7" liner. AFE Amount: Current Amount: Mud Type: FW/LIG WT: 10.0 VIS: 39 PV: 12 YP: 13 FL: 6.4 Solids: 12 Temp: 104 °F SURVEY hg2 ANGLE DIRECTION TVD SECTION COORDINATES BP EXPLORATION Rig: DOYON 15 Well: 1- 63/T -22 (MPI) Daily Drilling Report -- ENDICOTT February 24, 1989 at 0600 hrs AFE # 717564 AFE Amount: API: 50- 029 -21905 Current Amount: 0600 Depth: 13196' Day: 28 24 - Hour Ftg: 0 Current Operation: Drill cement to top of liner. Run and cement 7" liner, shoe @ 13196'. POH. RIH w/ 8 -1/2" bit & 9 -5/8" casing scraper. Mud Type: FW/LIG WT: 10.0 VIS: 34 PV: 12 YP: 5 FL: 6.4 Solids: 11 Temp: °F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES Id BP EXPLORATION DOYON 15 Well: 1- 63/I' -22 (MPI) Daily Drilling Report -- ENDICOTT February 27, 1989 at 0600 hrs AFE # 717564 AFE Amount: API: 50- 029 -21905 Current Amount: 0600 Depth: 13109' Day: 31 72 - Hour Ftg: 0 Current Operation: Position perforating guns. Drill cement out of 7 "liner. Test liner to 3000 psi - OK. Displace well to 9.1 ppg brine. Filter brine. Run cased hole logs: Gyro and CET /CBT. RIH with drill pipe conveyed perforating guns. Mud Type: NACL WT: 9.1 VIS: PV: YP: FL: Solids: Temp: cF SURVEY VID ANGLE DIRECTION TVD SECTION COORDINATES 1)LS BP EXPLORATION ig: DOYON 15 Tell: 1- 63/T -22 (MPI) Daily Drilling Report -- ENDICOTT February 28, 1989 at 0600 hrs AFE # 717564 API: 50- 029 -21905 0600 Depth: 13109' Day: 32 24 - Hour Ftg: 0 AFE Amount: Current Amount: 'urrent Operation: Running 3 -1/2" tubing. Perforate well and flow fluids to surface. Kill well. POH and lay -down perf guns. R/U to run tubing. It'd Type: NaCL WT: 9.1 VIS: PV: YP: FL: Solids: Temp: T ;U RVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS Rig: DOYON 15 Well: 1- 63[T -22 (MPI) Current Operation: Closing sliding sleeve. Run 3 -1/2" tubing and land. N/D BOPE and N/U tree. Test tree - OK. R/U slickline and set packer. Test tubing and annulus - OK. Displace annulus to 9.6 ppg inhibited brine and 40 bbl. diesel through sliding sleeve. RIH to close sleeve. Mud Type: NaCL WT: 9.6 VIS: PV: YP: FL: Solids: Temp: P SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS BP EXPLORATION Daily Drilling Report -- ENDICOTT March 1, 1989 at 0600 hrs 0600 Depth: 13109' PBTD Day: 33 24 - Hour Ftg: 0 AFE # 717564 AFE Amount: API: 50 -029 -21905 Current Amount: Rig: DOYON 15 Well: 1- 63fI' -22 (MPI) Current Operation: Rig released. Mud Type: 1G BP EXPLORATION Daily Drilling Report -- ENDICOTT March 2, 1989 at 0600 hrs AFE # 717564 API: 50- 029 -21905 0600 Depth: Day: 34 24 - Hour Ftg: AFE Amount: Current Amount: RIH and shut sliding sleeve. Install BPV. Release rig at 0800 hours on 3/1/89. Moving to slot 2 -46. WT: VIS: PV: YP: FL: Solids: Temp: SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS cii D Job Reference No. 73158 Locoed Bv; WARNER UIDANCE ONTINUOUS OOL SU8-SURFA CE DIRECTIONAL SURVEY 011 MED Date..-1L4 Company BP EXPLORATION Well Name 1- 63/T -22 MPI(2213' SNL,2213' WEL,SEC 36,T12N,R16E Field/Location, NORTH SLOPE, ALASKA Date 25 FEB - 89 Computed Bv: KRUWELL cx _„c * ** * * * ** * * * * * * * * * * ** # # # # * SCHLUMBERGER * # # # # # # # ## # * * # # * * * * ** ## GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR BP EXPLORATION 1 -63 / T -22 MPI ENDICOTT NORTH SLOPE, ALASKA SURVEY DATE: 25- FEB -89 ENGINEER: D. WARNER METHODS OF COMPUTATION TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 11 DEG 59 MIN EAST BP EXPLORATION 1 -63 / 7-22 MPI ENDICOTT NORTH SLOPE, ALASKA TRUE SUB -SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH CG MIN DEG MIN 100.00 10 200.00 200.00 300.00 300.00 400.00 400.00 500.00 499.99 600.00 599.89 700.00 699.54 800.00 799.05 900.00 898.52 1000.00 998.02 1100.00 1097.54 1200.00 1197.05 1300.00 1296.55 1400.00 1396.03 1500.00 1495.44 1600.00 1594.83 1700.00 1694.17 1800.00 1793.53 1900.00 1892.92 2000.00 1992.36 2100.00 2091.83 2200.00 2191.32 2300.00 2290.86 2400.00 2390.43 2500.00 2490.02 2600.00 2589.67 2700.00 2689.29 2800.00 2788.90 2900.00 2888.56 3000.00 2988.22 3100.00 3087.94 3200.00 3187.68 3300.00 3287.33 3400.00 3386.71 3500.00 3485.62 3600.00 3584.01 3700.00 3681.69 3800.00 3778.44 3900.00 3874.80 INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH -55.250 44.75 244.75 344.75 444.74 544.64 644.29 743.80 843.27 942.77 1042.29 1141.80 1241.30 1340.78 1440.19 1539.58 1638.92 1738.28 1837.67 1937.11 2036.58 2136.07 2235.61 2335.18 2434.77 2534.42 2634.04 2733.65 2833.31 2932.97 3032.69 3132.43 3232.08 3331.46 3430.37 3528.76 3626.44 3723.19 3819.55 COMPUTATION DATE: 1- MAR -89 N 0 0 E S 27 49 E S 14 35 E S 64 12 W '0 24 S 5 38 E 1 16 S 18 56 E 3 5 S 11 10 8 E 5 54 S 5 46 E 5 38 S 4 28 E 5 34 S 2 6 E 5 46 S 1 45 W 6 0 S 2 25 W 6 14 4 S 2 16 W 6 40 S 1 40 W 6 22 S 2 4 W 6 22 S 2 50 W 5 54 S 3 25 W 5 31 S 3 47 W 5 22 9 S 6 59 W 5 4 S 8 45 W 4 45 S 10 44 W 4 50 S 9 47 W 4 53 S 9 59 W 4 10 S 7 36 W 4 21 S 8 32 W 7 24 4 S 0 41 E 9 21 11 16 S 17 0 56 E 13 37 S 17 44 E 15 6 1 S 13 58 E VERTICAL SECTION FEET 0.00 0.33 0.57 0.64 1.01 2.21 6.39 14.69 24.58 34.77 44.76 54.44 64.13 73.78 83.73 94.24 104.94 116.05 126.99 137.68 147.90 157.88 167.64 176.77 185.52 194.08 201.86 209.92 218.05 225.84 233.48 240.60 247.38 255.37 266.31 280.96 298.63 319.84 345.00 371.68 DOGLEG SEVERITY DEG /100 DATE OF SURVEY: KELLY BUSHING ELEVATION: PAGE 1 25- FEB -89 55.25 FT ENGINEER: D. WARNER RECTANGULAR COORDINATES HORIZ. DEPARTURE NORTH /SOUTH EAST /WEST DIST. AZIMUTH FEET FEET FEET DEG MIN 0.00 0.00 N 0.00 E 0.09 0.37 S 0.15 W 0.40 S 22 41 W 0.15 0.60 S 0.07 W 0.60 S 6 45 W 0.28 0.69 S 0.17 W 0.71 S 14 3 W 0.66 1.10 S 0.29 W 1.13 S 14 48 W 1.97 2.25 S 0.05 E 2.25 S 1 22 E 2.79 6.30 S 1.06 E 6.39 S 9 33 E 1.51 14.46 5 2.64 E 14.70 S 10 21 E 0.11 24.29 S 3.93 E 24.61 S 9 11 E 0.25 34.48 S 5.05 E 34.84 S 8 19 E 0.30 0.45 0.10 0.47 0.61 0.22 0.22 0.88 0.22 0.59 0.50 0.74 0.47 0.36 0.24 1.47 0.58 0.30 0.94 0.31 1.20 0.39 1.47 1.92 2.95 1.90 1.76 2.73 0.78 1.46 44.49 S 5.99 E 44.89 S 7 39 E 54.26 S 6.56 E 54.65 S 6 53 E 64.15 S 6.68 E 64.49 S 5 56 E 74.05 S 6.47 E 74.33 S 4 59 E 84.30 S 6.12 E 84.52 S 4 9 E 95.11 S 5.76 E 95.29 S 3 27 E 106.14 S 5.39 E 106.28 S 2 54 E 117.59 S 4.94 E 117.69 S 2 24 E 128.85 S 4.60 E 128.93 S 2 2 E 139.87 S 4.15 E 139.93 S 1 41 E 150.42 S 3.63 E 150.47 S 1 22 E 160.74 S 3.11 E 160.77 5 1 6 E 170.84 S 2.56 E 170.86 S 0 51 E 180.36 S 1.66 E 180.37 S 0 31 E 189.53 S 0.59 E 189.53 S 0 10 E 198.54 S 0.63 W 198.54 S 0 10 W 206.76 S 1.90 W 206.77 S 0 31 W 215.33 S 3.44 W 215.36 S 0 54 W 223.96 S 4.96 W 224.02 S 1 16 W 232.20 S 6.24 W 232.28 S 1 32 W 240.25 S 7.38 W 240.37 S 1 45 W 247.75 S 8.40 W 247.89 S 1 56 W 254.90 S 9.45 W 255.08 S 2 7 W 263.19 S 10.02 W 263.39 S 2 10 W 274.17 S 9.04 W 274.32 S 1 53 W 288.36 S 5.34 W 288.41 S 1 3 W 305.15 S 0.69 E 305.15 S 0 7 E 325.33 S 7.76 E 325.42 S 1 21 E 349.41 S 15.44 E 349.76 S 2 31 E 375.17 S 22.61 E 375.85 S 3 26 E MEASURED DEPTH 4000.00 4100.00 4200.00 4300.00 4400.00 4500.00 4600.00 4700.00 4800.00 4900.00 5000.00 5100.00 5200.00 5300.00 5400.00 5500.00 5600.00 5700.00 5800.00 5900.00 6000.00 6100.00 6200.00 6300.00 6400.00 6500.00 6600.00 6700.00 6800.00 6900.00 7000.00 7100.00 7200.00 7300.00 7400.00 7500.00 7600.00 7700.00 7800.00 7900.00 BP EXPLORATION 1 -63 / T -22 MPI ENDICOTT NORTH SLOPE, ALASKA TRUE VERTICAL DEPTH 3970.71 4066.00 4159.66 4251.44 4341.41 4429.67 4516.20 4600.71 4683.34 4764.08 4844.39 4924.72 5004.52 5084.27 5164.15 5244.03 5323.62 5400.50 5473.87 5543.83 5612.44 5681.46 5751.05 5821.02 5891.08 5961.73 6032.65 6103.80 6175.08 6246.16 6317.02 6387.16 6456.79 6526.11 6595.13 6663.81 6731.45 6798.75 6865.87 6932.95 SUB -SEA VERTICAL DEPTH 3915.46' 4010.7 4104.41 4196.19 4286.16 4374.42 4460.95 4545.46 4628.09 4708.83 4789.14 4869.47 4949.27 5029.02 5108.90 5188.78 5268.37 5345.25 5418.62 5488.58 5557.19 5626.21 5695.80 5765.77 5835.83 5906.48 5977.40 6048.55 6119.83 6190.91 6261.77 6331.91 6401.54 6470.86 6539.88 6608.56 6676.20 6743.50 6810.62 6877.70 COMPUTATION DATE: 1- MAR -89 INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH COURSE VERTICAL IATION AZIMUTH SECTION S IN DEG MIN FEET S 11 6 E S 12 31 E S 12 47 E 5 14 9 E 24 5 S 13 56 E 31 11 S 10 36 E 35 12 5 12 43 E 36 34 S 12 25 E 36 37 S 12 29 E 37 12 S 12 33 E 37 1 S 12 49 E 37 0 S 12 54 E 36 59 4 5 13 18 E 41 26 • 8 S 13 23 E 46 35 S 13 34 E 46 32 S 13 53 E 45 46 S 15 29 4 E 45 • 26 5 15 25 0 E 44 44 39 S 15 58 E 44 33 S 16 16 E 44 36 5 16 25 E 44 49 S 16 22 E 44 59 S 16 16 E 45 45 S 15 47 E 45 59 S 15 35 E 46 • 12 S 15 30 E 46 52 5 15 25 E 47 47 S 15 5 13 E 47 59 S 15 5 E 47 48 S 15 0 E 399.98 430.27 465.27 504.94 548.55 595.50 645.61 699.04 755.35 814.34 873.92 933.47 993.73 1054.06 1114.21 1174.36 1234.90 1298.79 1366.70 1438.11 1510.83 1583.14 1654.87 1726.19 1797.41 1868.03 1938.38 2008.46 2078.38 2148.52 2218.88 2289.98 2361.60 2433.54 2505.76 2578.31 2651.84 2725.68 2799.69 2873.75 DOGLEG SEVERITY DEG /100 1.45 4.17 3.27 2.69 2.40 2.65 3.11 2.42 2.20 0.61 0.09 0.58 0.31 0.22 0.31 0.19 2.53 3.01 2.73 0.76 0.49 0.69 0.42 0.34 0.90 0.19 0.54 0.72 0.13 0.36 0.87 0.50 0.31 0.15 0.39 1.31 0.30 0.73 0.98 1.11 RECTANGULAR COORDINATES HORIZ. DEPARTURE NORTH /SOUTH EAST /WEST GIST. AZIMUTH FEET FEET FEET DEG MIN 402.79 432.64 466.96 505.66 548.08 593.56 642.54 695.09 750.14 807.71 865.91 924.06 982.90 1041.75 1100.39 1159.00 1217.96 1280.14 1346.23 1415.69 1486.37 1556.53 1625.96 1694.88 1763.65 1831.78 1899.59 1967.09 2034.38 2101.85 2169.56 2238.06 2307.17 2376.61 2446.35 2516.40 2587.40 2658.73 2730.28 2801.90 DATE OF SURVEY: KELLY BUSHING ELEVATION: S 28.76 S 34.00 S 40.88 S 49.59 S 71.68 S 82.26 S 92.00 S 103.84 S 116.70 5 129.48 S 142.34 S 155.40 S 168.66 S 182.11 S 195.66 S 209.43 S 224.24 S 239.94 S 256.62 S 273.84 S 291.56 S 309.89 5 328.72 5 347.74 5 366.87 S 386.21 S 405.71 S 425.49 S 445.38 S 465.22 S 484.93 S 504.31 5 523.61 S 542.92 S 562.29 S 581.88 S 601.46 S 620.82 S 640.09 E E E E E E E E E E E E E E E E E F. E E E PAGE 2 25- FEB -89 55.25 FT ENGINEER: D. WARNER 403.82 433.98 468.75 508.09 551.33 597.87 647.78 701.15 757.30 816.10 875.54 934.96 995.10 1055.31 1115.36 1175.40 1235.83 1299.63 1367.44 1438.76 1511.38 1583.60 1655.23 1726.46 1797.61 1868.16 1938.45 2008.50 2078.39 2148.52 2218.88 2290.00 2361.65 2433.61 2505.87 2578.46 2652.03 2725.91 2799.97 2874.08 S 4 5 E S 4 29 E S 5 36 E S 6 13 3 E 5 7 32 E 5 7 52 3 E S 8 30 E 5 8 45 E S 8 59 E 5 9 23 E 5 9 34 E S 9 45 E S 9 56 E S 10 16 E S 10 26 E S 10 36 E S 10 47 E S 10 58 E S 11 19 E S 11 29 E S 11 48 E S 11 57 E S 12 13 E S 12 19 E S 12 25 E S 12 30 E S 12 40 E S 12 44 E S 12 48 S 12 52 E 8P EXPLORATION 1-63 / T -22 MPI ENDICOTT NORTH SLOPE, ALASKA 8000.00 7000.41 6945.16 810 7067.98 7012.7 8200.00 7135.85 7080.60' 8300.00 7204.24 7148.99 `51 8400.00 7272.73 7217.48`:; 46 23 8500.00 7341.76 7286.51 46 30 8600.00 7410.52 7355.27 46 37 8700.00 7479.33 7424.08 46.42 8800.00 7547.92 7492.67 46 41 8900.00 7616.12 7560.87 47 0 9000.00 7684.10 7628.85 47 10 9100.00 7751.91 7696.66 47 18 9200.00 7819.96 7764.71 46 44 9300.00 7888.79 7833.54 46 15 9400.00 7958.32 7903.07 45 37 9500.00 8028.67 7973.42 44 59 9600.00 8099.72 8044.47 44 26 9700.00 8171.45 8116.20 44 4 9800.00 8243.11 8187.86 44 36 9900.00 8313.65 8258.40 45 32 10000.00 8383.40 8328.15 46 1 10100.00 8452.42 8397.17 46 41 10200.00 8520.45 8465.20 47 38 10300.00 8587.20 8531.95 48 35 10400.00 8652.74 8597.49 49 26 10500.00 8717.53 8662.28 49 32 10600.00 8782.40 8727.15 49 43 10700.00 8847.15 8791.90 49 29 10800.00 8912.47 8857.22 48 57 10900.00 8978.44 8923.19 48 37 111000.00 9044.61 8989.36 48 23 11100.00 9111.53 9056.28 47 29 11200.00 9179.59 9124.34 46 40 11300.00 9248.83 9193.58 45 42 11400.00 9319.39 9264.14 44 25 11500.00 9391.38 9336.13 43 45 11600.00 9463.72 9408.47 43 26 11700.00 9536.57 9481.32 42 55 11800.00 9610.39 9555.14 42 2 11900.00 9684.04 9628.79 43 10 COMPUTATION DATE: 1- MAR -89 S 15 0 E 2947.46 S 15 7 E 3021.07 S 15 17 E 3094.40 S 15 15 E 3167.24 S 15 17 E 3239.97 S 15 31 E 3312.20 S 15 59 E 3384.66 S 16 19 E 3457.02 S 16 17 E 3529.58 S 16 11 E 3602.52 S 16 15 E 3675.66 S 16 17 E 3748.95 S 16 28 E 3822.01 S 16 35 E 3894.33 S 16 30 E 3965.97 S 16 30 E 4036.82 S 16 37 E 4106.96 S 16 46 E 4176.41 S 16 23 E 4245.92 S 16 3 E 4316.62 S 15 28 E 4388.12 S 14 47 E 4460.36 S 13 56 E 4533.59 S 13 18 E 4608.02 S 12 33 E 4683.54 S 12 29 E 4759.71 S 12 59 E 4835.80 S 13 0 E 4912.00 S 12 43 E 4987.70 S 12 4 E 5062.85 S 12 1 E 5137.83 S 11 10 E 5212.13 S 10 10 E 5285.37 S 9 19 E 5357.47 S 8 21 E 5428.23 S 6 45 E 5497.42 S 5 50 E 5566.11 S 5 5 E 5634.17 S 4 10 E 5701.07 S 3 59 E 5768.04 0.12 0.34 0.57 0.49 0.41 0.29 0.69 1.02 0.98 0.33 0.47 0.47 0.87 0.55 0.84 0.69 0.79 0.30 1.38 0.73 0.77 0.92 1.11 1.04 0.77 1.06 0.59 0.58 0.83 0.40 0.56 1.33 0.98 1.11 1.84 1.09 0.71 9.83 0.83 2.03 PAGE 3 DATE OF SURVEY: 25- FEB -89 KELLY BUSHING ELEVATION: 55.25 FT INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB -SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. MEASURED VERTICAL VERTICAL D VI,ATION AZIMUTH SECTION SEVERITY NORTH /SOUTH EAST/WEST DIST. DEPTH DEPTH DEPTH N DEG MIN FEET DEG /100 FEET FEET FEET 2873.20 S 2944.39 S 3015.26 S 3085.64 S 3155.92 S 3225.69 S 3295.58 S 3365.25 S 3435.09 S 3505.31 S 3575.73 S 3646.29 S 3716.59 S 3786.14 S 3855.02 S 3923.17 S 3990.62 S 4057.35 S 4124.18 S 4192.25 5 4261.21 S 4331.04 S 4402.04 S 4474.42 S 4548.03 5 4622.43 S 4696.66 S 4770.89 S 4844.69 S 4918.09 S 659.16 E 678.34 E 697.61 E 716.84 E 736.03 E 755.21 E 774.88 E 795.16 E 815.60 E 836.03 E 856.52 877.11 897.75 918.41 938.90 959.07 979.11 999.17 1019.12 1038.90 4991.42 S 1228.94 5064.17 S 1244.08 5136.19 S 1257.51 5207.30 S 1269.75 5277.29 S 1280.76 5346.10 S 1289.84 5414.73 S 1297.32 5482.92 S 1303.85 5550.16 S 1309.28 5617.64 S 1313.91 ENGINEER: D. WARNER 2947.85 $ 12 55 E 3021.52 S 12 58 E 3094.90 S 13 1 E 3167.81 S 13 4 E 3240.61 S 13 7 E 3312.91 S 13 10 E 3385.46 S 13 13 E 3457.92 S 13 17 E 3530.58 S 13 21 E 3603.63 5 13 24 E E 3676.89 E 3750.30 E 3823.48 E 3895.94 E 3967.71 E 4038.70 E 4108.98 E 4178.57 E 4248.23 E 4319.06 1058.40 E 4390.68 5 13 56 E 1077.31 E 4463.02 S 13 58 E 1095.50 E 4536.31 S 13 58 E 1113.00 E 4610.77 S 13 58 E 1129.92 E 4686.28 S 13 57 E 1146.26 E 4762.43 S 13 55 E 1162.99 E 4838.51 S 13 54 E 1180.27 E 4914.72 S 13 53 E 1197.17 E 4990.42 S 13 52 E 1213.31 E 5065.55 S 13 51 E E 5140.48 E 5214.74 E 5287.89 E 5359.87 E 5430.48 E 5499.50 E 5567.98 E 5635.82 E 5702.50 E 5769.25 DEPARTURE AZIMUTH DEG MIN S 13 28 E S 13 31 E S 13 38 E $ 13 44 E S 13 50 E S 13 55 E S 13 49 E S 13 45 E S 13 42 E S 13 33 E S 13 28.E S 13 16 E S 13 9 E BP EXPLORATION 1 -63 / T -22 MPI END NORTH SLOPE, ALASKA MEASURED DEPTH 12000.00 12100.00 12200.00 12300.00 12400.00 12500.00 12600.00 12700.00 12800.00 12900.00 13000.00 13100.00 13196.00 TRUE SUS -SEA VERTICAL VERTICAL DEPTH DEPTH 9756.29 9701.04 9827.20 9771.95: 9897.11 9841.86 9965.31 9910.06 4 S 10031.75 9976.50,E ' 48 58 100 96.94 10041.69 49'29 29 10161 .64 10106.39 50 1 102 25.60 10170.35 50 25 10289.14 10233.89 50 3 10353.54 10298.29 50 54 10416.59 10361.34 50 54 10479.64 10424.39 50 54 10540.17 10484.92 50 54 INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH COURSE VERTICAL DOGLEG RECTANGULAR VIATION AZIMUTH SECTION SEVERITY NORTH /SOUTH IN DEG MIN FEET DEG/100 FEET COMPUTATION DATE: 1- MAR -89 S 3 34 E 5836.49 S 2 46 E 5906.17 S 2 34 E 5976.71 S 2 41 E 6048.86 S 2 40 E 6122.61 S 2 30 E 6197.43 S 2 33 E 6272.63 S 2 41 E 6348.48 S 2 36 E 6424.68 S 2 21 E 6500.04 S 2 21 E 6576.57 S 2 21 E 6653.09 S 2 21 E 6726.56 2.35 5686.62 S 0.95 5757.02 S 1.30 5828.45 S 0.60 5901.50 S 0.82 5976.15 S 0.27 .6 6128.07 S 0.57 6204.87 S 0.07 6282.00 S 0.00 6358.44 S 0.00 6435.99 S 0.00 6513.55 S 0.00 6588.00 S 1318.63 E 5837.50 1322.53 E 5906.98 1325.79 E 5977.33 1329.12 E 6049.32 1332.61 E 6122.93 1336.06 E 6197.62 1339.39 E 6272.74 1342.89 E 6348.52 1346.54 E 6424.69 1349.38 E 6500.04 1352.57 E 6576.58 1355.77 E 6653.15 1358.84 E 6726.67 PAGE 4 DATE OF SURVEY: 25- FEB -89 KELLY BUSHING ELEVATION: 55.25 FT ENGINEER: D. WARNER COORDINATES HORIZ. EAST /WEST DIST. FEET FEET DEPARTURE AZIMUTH DEG MIN S 13 3 E S 12 56 E 3 12 48 E S 12 41 E S 12 34 E S 12 19 E S 12 12 E S 11 58 E S 11 45 E S 11 39 E MEASURED DEPTH 0.00 1000.00 2000.00 3000.00 4000.00 5000.00 6000.00 7000.00 8000.00 9000.00 BP EXPLORATION 1 -63 / T-22 MPI ENDICOTT NORTH SLOPE, ALASKA 10000.00 11000.00 12000.00 13000.00 13196.00 TRUE VERTICAL DEPTH 0.00 998.02 1992.36 2988.22 3970.71 4844.39 5612.44 6317.02 7000.41 7684.10 SU8 -SEA COURSE VERTICAL EVIA ION AZIMUTH DEPTH N DEG MIN - 5.25 94z.77' 1937.11 2932.97 3915.46 16 52 4789.14 36 31 5557.19 46 32 6261.77 44 59 6945.16 47 36 7628.85 47 10 8383.40 8328.15 46 1 9044.61 8989.36 48 23 9756.29 9701.04 44 5 10416.59 10361.34 50 54 10540.17 10484.92 50 54 COMPUTATION DATE: 1- MAR -89 INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH VERTICAL SECTION FEET N 0 28 E 0.00 S 3 25 W 147.90 5 7 35 W 233.48 S 11 6 E 399.98 S 12 24 E 873.92 S 13 53 E 1510.83 S 16 16 E 2218.88 5 15 0 E 2947.46 S 16 15 E 3675.66 5 15 28 E 4388.12 S 12 1 E 5137.83 S 3 34 E 5836.49 S 2 21 E 6576.57 S 2 21 E 6726.56 DOGLEG SEVERITY DEG/100 RECTANGULAR COORDINATES HORIZ. NORTH /SOUTH EAST /WEST DIST. FEET FEET FEET PAGE 5 DATE OF SURVEY: 25- FEB -89 KELLY BUSHING ELEVATION: 55.25 FT ENGINEER: D. WARNER • DEPARTURE AZIMUTH DEG MIN 0.00 0.00 N 0.00 E 0.00 N 0 0 E 0.30 44.49 S 5.99 E 44.89 S 7 39 E 0.50 150.42 S 3.63 E 150.47 S 1 22 E 1.20 240.25 S 7.38 W 240.37 S 1 45 W 1.45 402.79 S 28.76 E 403.82 S 4 5 E 0.09 865.91 5 129.48 E 875.54 S 8 30 E 0.49 1486.37 S 273.84 E 1511.38 S 10 26 E 0.87 2169.56 S 465.22 E 2218.88 S 12 6 E 0.12 2873.20 S 659.16 E 2947.85 S 12 55 E 0.47 3575.73 S 856.52 E 3676.89 S 13 28 E 0.77 4261.21 S 1058.40 E 4390.68 S 13 56 E 0.56 4991.42 S 1228.94 E 5140.48 S 13 49 E 2.35 5686.62 S 1318.63 E 5837.50 S 13 3 E 0.00 6435.99 S 1352.57 E 6576.58 S 11 52 E 0.00 6588.00 S 1358.84 E 6726.67 S 11 39 E BP EXPLORATION 1-63 / T -22 MPI ENDICOTT NORTH SLOPE, ALASKA MEASURED DEPTH 0.00 55.25 155.25 255.25 355.25 455.26 555.29 655.52 755.97 856.49 957.02 1057.51 1157.99 1258.49 1359.00 1459.57 1560.17 1660..81 1761.48 1862.10 1962.69 2063.23 2163.76 2264.23 2364.68 2465.09 2565.47 2665.84 2766.21 2866.58 2966.92 3067.22 3167.49 3267.79 3368.30 3469.24 3570.70 3672.83 3775.99 3879.67 TRUE YERTICAL DEPTH 0.00 155.25 255.25 355.25 455.25 555.25 655.25 755.25 855.25 955.25 1055.25 1155.25 1255.25 1355.25 1455.25 1555.25 1655.25 1755.25 1855.25 1955.25 2055.25 2155.25 2255.25 2355.25 2455.25 2555.25 2655.25 2755.25 2855.25 2955.25 3055.25 3155.25 3255.25 3355.25 3455.25 3555.25 3655.25 3755.25 3855.25 2900.00 3000.00 3100.00 3200.00 3300.00 3400.00 3500.00 3600.00 3700.00 3800.00 COMPUTATION DATE: 1- MAR -89 INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB -SEA DEPTH SUB -SEA COURSE VERTICAL DEVIATION AZIMUTH DEPTH IN DEG MIN N 0 0 E 0.00 ��� 100.0Q� S 17 41 E 200.00 4 S 70 25 W 300.00 15 S 15 27 W 400.00 0 38 S 17 26 E 500.00 2'27 S 14 10 E 600.00 4 56 S 11 15 E 700.00 5 45 S 7 19 E 800.00 5 54 S 6 5 E 900.00 5 45 S 5 19 E 1000.00 5 36 S 3 15 E 1100.00 5 43 S 0 39 E 1200.00 5 39 S 1 20 W 1300.00 5 54 S 1 58 W 1400.00 6 14 S 1 31 W 1500.00 6 20 5 1 58 W 1600.00 6 38 S 2 27 W 1700.00 6 24 S 1 48 W 1800.00 6 18 5 2 19 W 1900.00 5 53 S 3 5 W 2000.00 5 53 S 2 47 W 2100.00 5 44 S 3 28 W 2200.00 5 33 S 5 51 W 2300.00 5 16 S 6 38 W 2400.00 5 13 5 7 52 W 2500.00 4 42 S 9 0 W 2600.00 4 57 S 9 20 W 2700.00 5 9 S 10 6 W 2800.00 4 47 S 9 21 W 4 22 S 8 14 W 4 7 S 8 32 W 4 6 39 S 6 45 E 8 49 S 16 10 E 10 44 S 19 46 E 12 5 S 18 37 14 47 S 17 10 E 15 47 S 14 33 E VERTICAL SECTION FEET 0.00 0.19 0.46 0.63 0.76 1.51 3.96 10.64 20.15 30.31 40.55 50.34 60.03 69.77 79.62 89.99 100.65 111.60 122.82 133.65 144.21 154.23 164.18 173.52 182.50 191.11 199.23 207.24 215.28 223.22 230.95 238.30 245.16 252.55 262.44 276.11 293.09 313.64 338.83 366.11 DOGLEG SEVERITY DEG /100 0.00 1.76 0.05 0.26 0.54 0.73 2.66 1.78 0.38 0.53 0.76 0.33 0.48 0.25 0.07 0.48 0.18 0.84 0.13 0.38 0.'28 0.13 0.62 0.72 0.85 0.23 0.74 1.78 0.68 1.23 0.38 0.59 0.22 1.66 2.23 2.10 2.05 3.19 1.09 1.51 PAGE 6 DATE OF SURVEY: 25- FEB -89 KELLY BUSHING ELEVATION: 55.25 FT RECTANGULAR NORTH /SOUTH FEET 0.00 N 0.24 S 0.50 S 0.66 S 0.83 S 1.59 S 3.94 S 10.47 5 19.88 S 30.01 S 40.26 S 50.11 S 59.95 S 69.92 S 80.06 S 90.74 S 101.71 5 113.00 S 124.55 S 135.71 S 146.61 S 156.97 S 167.26 S 176.97 S 186.37 S 195.41 S 203.97 5 212.49 5 221.02 S 229.44 S 237.59 S 245.33 S 252.56 S 260.30 S 270.33 S 283.70 S 299.89 S 319.40 S 343.51 S 369.77 S ENGINEER: D. WARNER COORDINATES HORIZ. DEPARTURE EAST /WEST DIST. AZIMUTH FEET FEET DEG MIN 0.00 E 0.00 N 0 0 E 0.19 W 0.31 S 39 19 W 0.10 W 0.51 S 11 33 W 0.08 W 0.67 S 6 58 W 0.28 W 0.88 5 18 27 W 0.18 W 1.60 S 6 26 W 0.55 E 3.97 S 7 55 E 1.89 E 10.64 S 10 12 E 3.39 E 20.16 S 9 40 E 4.58 E 30.36 S 8 40 E 5.63 E 40.65 S 7 57 E 6.37 E 50.52 S 7 14 E 6.69 E 60.32 S 6 21 E 6.58 E 70.23 S 5 22 E 6.28 E 80.31 S 4 29 E 5.88 E 90.94 S 3 42 E 5.56 E 101.86 S 3 7 E 5.11 E 113.12 S 2 35 E 4.75 E 124.64 S 2 10 E 4.35 E 135.78 S 1 50 E 3.84 E 146.66 S 1 30 E 3.30 E 157.01 S 1 12 E 2.77 E 167.28 S 0 56 E 2.01 E 176.98 S 0 39 E 0.97 E 186.37 S 0 17 E 0.17 W 195.41 5 0 2 W 1.41 W 203.98 S 0 23 W 2.97 W 212.51 S 0 48 W 4.45 W 221.07 S 1 9 W 5.83 W 229.51 S 1 27 W 7.01 W 237.69 S 1 41 W 8.08 W 245.47 S 1 53 W 9.10 W 252.72 S 2 3 W 9.97 W 260.49 S 2 11 W 9.58 W 270.50 S 2 1 W 6.76 W 283.78 S 1 21 W 1.22 W 299.89 S 0 14 W 5.82 E 319.45 S 1 2 E 13.55 E 343.77 S 2 15 E 21.23 E 370.37 S 3 17 E BP EXPLORATION 1 -63 / T -22 MPI ENDICOTT NORTH SLOPE, ALASKA MEASURED DEPTH 3983.85 4088.64 4195.25 4304.20 4415.52 4529.37 4645.97 4765.77 4889.02 5013.51 5138.13 5263.65 5388.85 5514.04 5640.44 5774.16 5916.65 6062.12 6206.03 6348.83 6490.84 6631.74 6772.15 6912.81 7054.33 7197.79 7342.13 7487.51 7635.33 7784.08 7933.13 8081.17 8228.50 8374.63 8519.61 8665.00 8810.70 8957.52 9104.93 9251.36 INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB -SEA DEPTH TRUE SUB -SEA COURSE VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH N DEG MIN 3955.25 3900.0 „'; S 11 37 E 4055.25 4000.0 S 9 34 E 4155.25 4100.01 28 E 0 S 12 51 4255.25 4200.00-:, . �� 4355.25 4300.00 1 S 14 22 E 4455.25 4400.00 29 42 5 12 55 E 4555.25 4500.00 32' S 10 23 E 4655.25 4600.00 34,33 S 12 27 E 4755.25 4700.00 36 34 S 12 25 E 4855.25 4800.00 36 31 S 12 25 E 4955.25 4900.00 37 2 S 12 29 E 5055.25 5000.00 37 3 S 12 45 E 5155.25 5100.00 37 0 5 12 53 E 5255.25 5200.00 37 1 S 13 3 E 5355.25 5300.00 39 22 S 13 24 E 5455.25 5400.00 43 24 S 13 21 E 5555.25 5500.00 46 42 S 13 36 E 5655.25 5600.00 46 18 S 14 15 E 5755.25 5700.00 45 46 S 15 5 E 5855.25 5800.00 45 34 S 15 27 E 5955.25 5900.00 44 56 S 15 50 E 6055.25 6000.00 44 37 S 16 1 E 6155.25 6100.00 44 34 S 16 25 E 6255.25 6200.00 44 52 S 16 22 E 6355.25 6300.00 45 32 S 16 2 E 6455.25 6400.00 45 59 S 15 36 E 6555.25 6500.00 46 14 S 15 29 E 6655.25 6600.00 46 43 5 15 26 E 6755.25 6700.00 47 38 S 15 23 E 6855.25 6800.00 47 57 S 15 5 E 6955.25 6900.00 47 33 S 14 58 E 7055.25 7000.00 47 24 S 15 6 E 7155.25 7100.00 46 54 S 15 17 E 7255.25 7200.00 46 35 S 15 16 E 7355.25 7300.00 46 32 $ 15 35 E 7455.25 7400.00 46 27 S 16 17 E 7555.25 7500.00 46 46 S 16 16 E 7655.25 7600.00 47 15 S 16 13 E 7755.25 7700.00 47 17 S 16 17 E 7855.25 7800.00 46 31 S 16 32 E COMPUTATION DATE: 1-MAR -89 VERTICAL SECTION FEET 395.31 426.59 463.51 506.71 555.58 609.92 669.84 735.79 807.81 881.96 956.32 1032.18 1107.50 1182.81 1260.09 1348.79 1450.22 1555.81 1659.19 1760.96 1861.58 1960.60 2058.90 2157.52 2257.38 2360.02 2463.91 2569.24 2677.90 2787.85 2898.21 3007.22 3115.23 3221.62 3326.40 3431.70 3537.35 3644.56 3752.57 3859.22 DOGLEG SEVERITY DEG /100 1.28 4.13 3.22 2.66 2.74 1.95 1.99 0.55 0.09 1.27 0.41 0.25 0.23 4.11 3.08 0.37 0.64 0.46 0.19 0.22 0.30 0.09 0.59 0.77 0.31 0.36 0.61 0.31 1.18 0.71 0.23 1.12 1.01 0.17 0.97 1.03 0,40 0.44 46 946.37 1020.41 1093.84 1167.23 1242.47 1328.80 1427.46 1530.03 1630.14 1728.45 1825.56 1921.00 2015.63 2110.51 2206.64 2305.64 2405.94 2507.64 2612.57 2718.83 2825.56 2931.00 3035.39 3138.18 3239.39 3340.88 3442.57 3545.80 3649.77 3752.38 DATE OF SURVEY: KELLY BUSHING ELEVATION: RECTANGULAR COORDINATES HORIZ. DEPARTURE NORTH /SOUTH EAST/WEST DIST. AZIMUTH FEET FEET FEET DEG MIN 398.21 429.01 465.25 507.39 554.91 607.58 666.39 731.06 801.34 873.76 27.84 33.39 40.51 49.98 61.52 75.04 86.59 99.53 115.29 131.21 147.27 163.80 180.62 197.56 215.26 235.79 259.46 284.77 311.01 337.99 365.10 392.35 419.96 447.92 475.97 503.88 531.74 559.87 588.82 617.73 646.42 674.72 703.12 731.19 759.02 788.03 817.79 847.79 878.12 908.37 PAGE 7 25-FEB -89 55.25 FT ENGINEER: 0. WARNER ` E 430.31 E 467.01 E 509.8 E 558.31 E 612.20 E 671.99 E 737.81 E 809.59 E 883.56 E 957.76 E 1033.47 E 1108.66 E 1183.84 E 1260.98 E 1349.55 E 1450.85 E 1556.30 E 1659.54 E 1761.19 E 1861.71 E 1960.66 E 2058.91 E 2157.52 E 2257.39 E 2360.06 E 2464.00 E 2569.38 E 2678.10 E 2788.13 E 2898.56 E 3007.66 E 3115.76 E 3222.24 E 3327.13 E 3432.56 E 3538.37 E 3645.74 E 3753.92 E 3860.76 27 E 5 5 37 E 4 58 5 6 19 E S 7 24 E S 7 4 E S 8 8 11 32 E S 8 50 E 5 9 7 E 5 9 3 6 E S 10 49 3 E S 10 18 E S 10 32 E S 10 48 E S 11 3 E S 11 18 E S 11 32 E S 11 58 E S 12 10 E S 12 19 E S 12 27 E S 12 35 E S 12 48 E S 12 53 E S 12 57 E S 13 2 E S 13 11 E S 13 16 E 5 S 13 21 6 E S 13 31 E S 13 36 E l BP EXPLORATION 1-63 / T -22 MPI ENDICOTT NORTH SLOPE, ALASKA MEASURED DEPTH 9395.61 9537.50 9677.47 9817.11 9959.55 10104.12 10251.91 10403.86 10558.02 10712.48 10864.90 11016.01 11164.44 11309.20 11449.95 11588.32 11725.46 11860.71 11998.56 12139.83 TRUE VERTICAL DEPTH 7955.25 8055.25 8155.25 8255.25 8355.25 8455.25 8555.25 8655.25 8755.25 8855.25 8955.25 9055.25 9155.25 9255.25 9355.25 9455.25 9555.25 9655.25 9755.25 9855.25 12285.02 9955.25 12435.90 10055.25 12590.06 10155.25 12746.60 10255.25 13196.00 10540.17 SUB -SEA COURSE VERTICAL DEVIATION AZIMUTH DEPTH Deg MIN DEG MIN 7900.00 8000.00 8100.0C 8200.00 8300.00 8400.00 8500.00 8600.00 8700.00 8800.00 8900.00 9000.00 9100.00 9200.00 9300.00 9400.00 9500.00 9600.00 9700.00 9800.00 9900.00 10000.00 10100.00 10200.00 10484.92 47 45 47 46 48 49 28 49 35 49 25 48 39 48 18 46 59 45 37 43 53 43 30 42 40 42 43 44 45 31 47 38 49 12 49 58 50 30 50 54 COMPUTATION DATE: 1- MAR -89 INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB -SEA DEPTH VERTICAL SECTION FEET S 16 30 E 3962.83 S 16 31 E 4063.18 S 16 46 E 4160.80 S 16 19 E 4257.94 S 15 43 E 4359.12 S 14 44 E 4463.35 S 13 35 E 4572.09 S 12 31 E 4686.47 S 12 42 E 4803.79 S 12 58 E 4921.49 S 12 18 E 5036.50 S 11 59 E 5149.80 S 10 24 E 5259.46 S 9 14 E 5364.06 S 7 28 E 5462.90 S 5 55 E 5558.11 S 4 49 E 5651.35 S 3 53 E 5741.57 S 3 35 E 5835.51 S 2 36 E 5934.07 S 2 38 E 6037.91 S 2 39 E 6149.39 S 2 32 E 6265.12 S 2 44 E 6383.96 S 2 21 E 6726.56 DOGLEG SEVERITY DEG /100 0.79 0.42 0.30 1.18 0.66 0.92 1.02 0.74 0.79 0.61 0.67 0.63 1.15 1.09 1.30 0.80 1.47 0.93 2.25 1.65 1.89 0.65 0.45 0.48 0.00 DATE OF SURVEY: 25- FEB -89 KELLY BUSHING ELEVATION: 55.25 FT RECTANGULAR COORDINATES HORIZ NORTH /SOUTH EAST /WEST GIST. FEET FEET FEET 3852.01 S 3948.52 S 4042.36 S 4135.75 S 4233.22 S 4333.94 S 4439.46 S 4550.89 S 4665.46 S 4780.14 S 4892.33 5 5003.13 5 5110.68 S 5213.80 S 5311.72 S 5406.73 S 5500.17 S 5590.97 S 5685.63 S 5785.27 S 938.01 E 3964.57 966.59 E 4065.11 994.65 E 4162.93 1022.50 E 4260.28 1050.59 E 4361.64 1078.07 E 4466.01 1104.65 E 4574.83 1130.55 E 4689.22 1155.86 E 4806.51 1182.40 E 4924.21 1207.77 E 5039.21 1231.44 E 5152.45 1252.88 E 5262.01 1270.82 E 5366.44 1285.55 E 5465.07 1296.49 E 5560.00 1305.36 E 5652.95 1312.08 E 5742.87 1318.57 E 5836.52 1323.83 E 5934.80 5890.41 S 1328.60 E 6038.39 6003.26 S 1333.88 E 6149.66 6120.47 S 1339.05 E 6265.24 6240.77 S 1344.62 E 6383.98 6588.00 S 1358.84 E 6726.67 PAGE 8 ENGINEER: D. WARNER . DEPARTURE AZIMUTH DEG MIN S 13 41 E S 13 45 E 5 13 49 E S 13 56 E S 13 58 E S 13 57 E S 13 54 E S 13 53 E S 13 49 E S 13 46 E 5 13 41 E S 13 36 E S 13 29 E S 13 21 E S 13 12 E S 12 53 E S 12 42 E S 12 31 E S 12 20 E S 12 9 E S 11 39 E BP EXPLORATION 1-63 / 7 -22 MPI ENDICOTT NORTH SLOPE, ALASKA MARKER LAST GCT READING PBTD DRILLERS DEPTH COMPUTATION DATE: 1- MAR -89 INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = 2213' FNL E 2213' WEL, SEC36, T12N, R16E ASURED DEPTH BELOW KB 12891.20 13109.00 13196.00 FROM KB 10347.99 10485.31 10540.17 TVD SUB-SEA 10292.74 10430.06 10484.92 DATE OF SURVEY: KELLY BUSHING ELEVATION: PAGE 9 25- FE8 -89 55.25 FT ENGINEER: D. WARNER RECTANGULAR COORDINATES NORTH /SOUTH EAST /WEST 6351.62 S 1349.10 E 6520.53 S 1356.06 E 6588.00 S 1358.84 E BP EXPLORATION 1 / T -22 MPI ENDICOTT NORTH SLOPE, ALASKA MARKER LAST GCT READING P8T0 DRILLERS DEPTH FINAL WELL LOCATION AT TO MEASURED DEPTH TRUE VERTICAL DEPTH 13196.00 10540.17 # # # # # * # # # # ## STRATIGRAPHIC SUMMARY # # # # # # # # # # ## SUB -SEA VERTICAL DEPTH 10484.92 COMPUTATION DATE: 1- MAR -89 MEASURED DEPTH BELOW KB 12891.20 ''13109.00 13196.00 SURFACE LOCATION = 2213' FNL FROM KB 10347.99 10485.31 10540.17 TVD HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 6726.67 S 11 39 E SUB -SEA 10292.74 10430.06 10484.92 DATE OF SURVEY: KELLY BUSHING ELEVATION: PAGE 10 25- FEB -89 55.25 FT ENGINEER: D. WARNER E 2213' WEL, SEC36, T12N, R16E RECTANGULAR COORDINATES NORTH /SOUTH EAST /WEST 6351.62 S 6520.53 S 6588.00 S 1349.10 E 1356.06 E 1358.84 E REFERENCE 73158 SCHLUMBERGER DIRECTIONAL.SURVEY COMPANY BP EXPLORATION WELL 1 -63 / T -22 MPI FIELD ENDICOTT COUNTRY USA RUN ONE DATE LOGGED 25 - FEB - 89 .!O 000 FIT, II r-� i :...:_.t-:......: - •1.•.4- 4-- -i- «4+4- ..4_4••- 4••ti•_ +.4...." .f ••• { •• » .._.. .,... {_:_.,••• . • '_. ... ... ; ......j... .;.. .. «. t_. - . ...,... y .t... } 1. • 1 ! - h-4-4-4-4- V -d ;••••... - 4 ...- l-•: -•i -• ' ;-- - • - f - i -. -: - -; .- , • -- t - .. . * i T ._ - •+•••.••. ... i ... i . «i...� ? : I t �.. ..._.i...:....... i11 [..1 1 i i I .. ...;... _N•• ... - •:.. ..:..�._�... +...t_.y._� Y ... ; _.,... ; .... . •. " • •••. • - i_•i... .... w+• . ._._._ T .._. .« _. .... f , � i t ' 1 i t 1 : • : , • ' ; I I i i i i 1 • I i i i t"' I • i • i .. 4.4 • "T "r i! i -i-- 4-}......,...... r .,_. i i i i r r .-- 4 - 4.- ,_. + ... t ... r ..,...,. -.... _ »..- _.i•• {- .«•.y- 4--- 4 - ._ -•._ - •, ?«• -. •:.i_i_.i_._.i.- ;...i_ w ' - 4-4-1--r ... . .« .... -._ l i . t ] ii t i.4-. i , � f . 4... • .. • i ...}. - f.. ? - i } .. : :... i i l ;iii- i : ---•« i , t i i..«.. �- i .._«_ -. t F 1 }--- �-}- r ! ! e ! • . ! : -+ + .., i i 1 -. -!--1- •:•••_ -r• •i + y- :•• ...- ... «.« » .. .• ... !! I Z t 1 _ i., : i ti 1 ! i f i ! ..!! ,•••:�� '1 ! ... !ii : i--i- is -� i- I+ • i ! i i, ; ; e..,.,.v eewt _AMA _7NY1 n 2a0 4000 6000 8 WELL: 1- 63/T -22 MPI (2213' SNL, 2213' WEL, SEC 36, T12N, R16E) NORTH 4 0 -4 SOUTH -1 WEST SCALE = 1/2000 I N /FT HORIZONTAL PROJECTION EAST WELL: 1- 63/T -22 MPI (2213' SNL, 2213' WEL, SEC 36, T12N, R16E) r .. +.+. 4- T N$U**UN�NN■ MTh NUM MOM •NN111NN11111I•N111WIIS ^ -�- :.;.. N1fNNN1<NN MUM KIM 11111111 •� *111 SWUM /N0i• MUM WN 111111111111WHIIINIISHIMUll �NN MINIM ■NNN MIN SU N t 111111111111111111118111111111111111111111111111111101111111111111511 PROJECTION ON VEI1T!cp. PLANE 168. - 348. SCALED IN VERTICAL DEPTHS VERTICAL PROJECTION HOR I 2 SCALE = 1/2000 IN/FT PAGE NO. 1 *em*m***** COMPANY BPEXPLORAII]N E- P 1-63/T-22 LOCATION 1 �ENDICOTT MPI LOCATION 2 NORTH SLOPE ALASKA MAGNETIC DECLINATION 31.05 DATE 14-FEB-89 WELL NUMBER 63 AZIMUTH FROM ROTARY TABLE TO TARGET 13 168.93 TIE IN POINT(TIP) MEASURED DEPTH 0.00 TRUE VERT DEPTH 0.00 INCLINATION 0^00 AZIMUTH 0.00 LA3IIUDE(N/-3) 0^00 D3PARTURS(E/-W) 0.00 O FILMED � �� Date o WELL HEAD LOCATION: LAT(N/-S) 0^00 DEP(E/-W) 0^00 ********* ********** *********'* ANADRILL ********** ********* S[HLUM8ERGEH ********** ********* ` ********** SURVEY PRO;RA ********** PAGE NO. 2 MF'I 1- 63 /T-k2 '` * * * ** - # * * *** A34ADP'ILI. * * * *** # * ***** SURVEY CALCULATIONS **** RADIUS CF CURVATURE ME WID * **i►* ** MEASURED INTERVAL E'ER ICAL TARGET STATION AZIMUTH LATITUDE DEPARTURE DISPLACEMENT at AZIMUTH DLS DEPTH DEPTH SECTION INCLM, `4i -3 E/- i deg/ ft ft ft it peg deg ft ft ft deg IOOft 0.00 0.0 0.00 0.00. 0.00 0.00 0 +00 0.00 0.00 0.00 0.00 ��r ,a +! { r +!. 158.00 n 195 1 *_0.00 450.0 450.00 0.26 0.25 158.' 0 -0.13 0.68 0.70 101.00 0.05 t 82.0 5 99 1 51 1 50 1 -1.35 1.64 + 4 46 , 532.00 l.rl. . . .i 9.,1e1 -1 ,�5 0.`�3 1114 1 .!♦ 1.55 rnr n r el r-k + ':i 1 5.27 r ,fin 623.00 91.0 622.91 .26 3.25 169.00 -5.10 1.33 5.27 165.43 • 1.97 w A A r a ., r{ .' � 41.43 r 5.75 r i . n { r1 1084.'00 461.0 . 1082.45 5.7 5 16 9.00 - 40.60 3.23 41.43 163.55 0.54 rt r "+ r { C ror ,t r n r � a -* r n i �� { C '1A ' r°► ^� i'�i! � 1 LL 1 1559!00 475 +0 1554.73 ,2.01 6.50 175.00 -90.77 15.28 92.0 170.45 0. 2063 0 4 2055.74 7 ' 46 52 6.00 7, j� ,n ` T 172,33 0,10 Lv 1,196 J4 '� _.7 L1.r -.� 1 . « ,. 1. 7`120 -145.47 11.5 145.79 1! .,n niro, n r. A � C !e . r •+n 4n a1C 247 6.00 413.0 246 •.33 185.66 5 t 00 17 9.00 - 135.01 21.31 186.23 17 3.43 0.25 2711.00 235.0 2700+95 205.15 4.90 190.00 -205.19 19.72 206.13 174.51 0.41 3120.00 409.0 3108.69 235.39 4.10 187.00 -236.92 14.98 237.40 176.38 0.20 3308.00 188.0 3296.00 251.25 5.70 178.00 - 252.95 15.68 253.43 176.45 0.94 3402.00 95.0 3390.36 262.13 7.50 168.00 -263.77 17.01 264.32 176.31 2.24 r , 95.0 3 35 r,.,_ f 9 6 � _2.6.09 " 85 1:5.,5 2.01 5' 277 - 98.04 348 e�:l5 ;: 3.8� > +24 1 e +: ,.: + 7 c + ! c. . 3593.00 95.0 3577+86 292.42 11.10 158.00 - 292.82 26 +30 294.00 174+87 2.13 3683.00 95.0 3670.72 312.14 13.20 161.00 - 311.54 33.30 313.32 173,90 2.31 nro ro 69.0 nZn ro +1r'1fl 't { r r n r n +T � +'If / 37 5! .00 69.0 397 37 . 66 328.7 3 14.90 161.00 -327 .38 38.75 32 r .67 173.25 2 . 46 3390 00 1 33 0 3865 8 363.88 15 70 166.00 _361 2 -361.24 1 364.51 1.2 n a ,. .,+ + +1 1_ . .2'? 48 78 7 L +,� 1.25 -. a 2ro nr 7 f r 4017 +0�.� 127 +0 ,:'�87 +68 3�: +83 17.00 170.40 - 316.41 56}26 400.38 171.92 1124 4133.00 116.0 4097 + 426.53 19.90 167 +00 - 432.37 63.57 437.02 171.64 2.63 4228.00 95.0 4186.24 4709 22 60 i 4 '� -46 .7p 71.90 2 .ri v . � ._ i_Ctl4 � `O 1 +9L� 471.27 2.94 nr n {n 1 r Cr •�. r {r { L',' r C -C rC, n _ _ _ ti 4354.00 126 +0 4301+0_ 522.7 4 24.10 165..0 51_.95 85.35 522.96 170.6 2,73 ror ! a, r,r { 6 91{1 n a s "• -� r1 1 .� n a ii i '! n +'1 4576.08 222.► 44 6.1 28.23 ,.'4x.30 166.00 '_ 18.31 111.82 + 28.34 169.; : 2,13 4796.00 220.0 4680.51 7 +01 35.30 105.00 - 734.44 11.35 748.01 169.07 2.06 n r, ?, s w 36.80 � r i C +'I n' i { r 5087.00 291.0 4915.77 919.02 167.00 - 900:59 183.28 919.05 166.50 0.66 5276.00 189.0 5066.72 1032.70 37.20 167.00 - 1011.42 2 03.87 1032.76 163.33 0,21 r � � n n + { a a ! • rt +s•* . ! n . +�, r rI+ t 4 5465.00 189.0 5217.36 1146.63 37.10 164.00 - 1121.91 237.44 1146.76 168.05 0.96 r »» 5348.25 2 n 3 r 2 i 2r ` r{ 55 1.09 `6� �8 C +'41 �`:Ii i2'�b.i1 .tr',1 • 162.00 - 1G1�. 266.43 1248.55 �. +' 5631.a�JU 1�.� 0 •.:9 5 85. 00 22 \ ; 5511.13 1 r 0 00 1361 03 309 41 1395 30 16� 18 3.09 1V11tw1� LL4tti� 1:.•+5.21 45 }bar 163.00 -1J ...�v. v. t.. + +•' t �» ` n { w +r,� a -r r r :n {!• +, { •( n� . ar /'+ . n n 600 .00 150.0 5615.14 1502.7 5 46.60 ._ - .00 -1464.66 3 0.31 1503.67 166. 0.32 r� ry R ! n !'. r r . r r4fv n r •� » i . " 1�► t a � t ^ror '�/' r'� S 166.63 ,pro 619.1.00 190, 0 5746.65 1639.26 45.80 163.00 - 159..14 37 9.26 1.0.58 0.57 6381.00 190 +0 5879.47 1774.52 45.50 164.00 -1726.41 417.84 1776.26 166.39 0.41 6571.00 190.0 6013.35 1908.54 44.90 164.00 - 1856.01 455.00 .97 166.23 0 +32 . n� { 0 0 j . 2 2 s e 0 4 + . 5O { 9� t9. %5 2044 16!61 a fv �7613=J,.� 19•l.�J 6163.25. 2042,20 ,�!'ti0 1:_ ::a .7 -1984.90 '1.0 +. 166.11 0.40 f,`: ! n frC +" : + "T +1 7 i r+ i f r'; n na U C n 1 C f � ro 6956.00 195.0 6234. 7 217 8.96 44.90 163. `00 - 2116, :'6 528.59 2181.86 1 6 5.98 0.74 r +r nn r� al + 720F.00 249.0 6461.29 2255.7 , 46,10 164.00 -2287.14 8 17 9.03 2359.30 165.79 0.56 row` A n r� r% i , » ! C n a r. ati al a► +. + , iC 7» 7394 +00 139.0 6591.87 2491.90 46.50 164.00 - 2418.49 616.69 2495.88 165.! 0 0,21 �r n w � -r r r -. -� ro � n .v n r r+ n r , � !+ t'i L 7647.00 253 +0 6764.09 2676.67 47.70 165.00 - 2597.08 666.22 2681.17 165.61 0.56 7838.00 191.0 6892.38 2817.97 47.90 167.00 - 2734.36 700,44 2822.64 165.63 0.78 3028.00 190,0 7020.01 2958.64 47.70 167.00 - 2871.50 732.10 2963.35 165.70 0.10 8216.00 138.0 7147. 3096.98 47+10 168.00 - 3006.60 762.06 3101+67 165.78 0.50 PAGE NU. 3 MPI 1- 63/T -22 ***,- ,*** *** ANADEILL * * * * **** * * * * ** SURVEY CALCULATIONS * * * ** RADIUS OF CURVATURE METHOD * * *** *** MEASURED INTERVAL VERTICAL TARGET STATION AZIMUTH LATITUDE DEPARTURE DISPLACEMENT at AZIMUTH DLS DEPTH DEPTH SECTION It4"LN. N / -S E7r -W deg/ f ft ft ft dam. , deg ft ±t ft deg 100; t ri r iCrr n, � nn h e r „ r r t r .'4 rri '� hK.T A r nr'S /I11 7 3 159.0 7256.00 3212.91 46.60 166.00 -3119.62 788,15 3217.64 165 +82 0.97 3629.00 4 25 0 /4130 = 2 33 ( 9 7 1 2 y .r .. d 5 00 325 j }�� /29 ry3 3t + 3402.19 ' 5 i � 2 :..r .4 ! IL �'}.1i 'JJI.� .�.:� �t .l �t�1 + - :IV •J {��.J +LJ �J� . +Vr� ���.�.�a �.�I 9016.00 387.0 7694.46 3679.49 47 ►40 165.00 - 3571.68 907.61 3685.19 165.74 0 +21 9227.00 211 +0 7838.09 2833.59 46.80 164.00 - 3720 +62 9 3839.72 165.69 0.45 rt A n '� ?rr 3'7 cn r1t� � r n , K C h r h,' + r � 9414.00 187 .0 r 967 .52 3x63.06 45.60 164.00 - 3350.36 986.12 3974,63 165 +63 0.64 9 00 9n 7'� 7 0^ 1 ;, 4i 03 i3 44.50 i '}0 -3980+97 i n� 5 . 0 4 L 1 i �• 8 p , 7r, til:�t },f :� I rd.. +51 'll vvias.� .�. vsJ.'iJ 4�+.�+% 164.00 �y,.4.r7 1023.57 4110.46 1��5.1Q �..%7 9775.00 169.0 8223.70 4221.45 44.50 164.00 - 4094 +84 1056.22 4228.87 165 +54 0.00 9923.00 i r1 1 t •'• t s r � a: rC '� f• nh C C 148.0 83' 28.08 4 325.98 45.80 164 +00 - 4195 +; 0 1085.14 4333.75 165.50 0.88 10110.00 187.0 8457.15 4460.88 46.90 165.00 -4326.08 1121.30 4469.03 165.47 0.70 10309.00 199.0 8590 +82 4608.10 48.70 167.00 - 4469 +11 1156.96 4616.44 165.49 1 ►17 10522.00 213 +0 8730.14 4769.16 49.60 163.00 - 4626.40 1191 +83 4777.45 165.55 0 +55 '7 r5 r \. � i ! f i rKT r r r `� - . -� n+4 �'! r � 1 C r t0i 43.00 221 +u 8872.66 4937.19 49.40 168 ►30 - 4790.78 1226,77 4 45.35 i 6 y.44 0.09 10900 +00 157.0 8976.66 5055.67 48.60 169.00 - 4906.88 1250.37 5063.69 165 +70 0.70 11088.00 188.0 9102.09 5195.71 47.70 169.00 - 5044.35 1277.12 5203.51 165.19 0.48 11278.00 190.0 9232.03 5334.29 46.00 171.00 - 5180 +85 1301.18 5341.75 165.90 1.18 11463.00 185 +0 9363+18 5464.48 43.70 174.30 - 5310.18 1318.21 5471.35 166.06 1.69 t + f 5'4'4 ^r CCh r1 K Z . T I �r1 r{ r1h ^r'1 K r, ., , r , •�•+ 11.E 6 +� 93.0 9430.53 X523.31 43.50 175.00 -5374.02 1324.36 5534.;0 166.16 0.77 1 n r r r r1 '-C � .i h i t .� • n r a n-r G ,. h •� r 1 64 93.0 9498 +21 5591.74 43.10 17 5.00 -5437 +56 1329.92 5597.33 1 66.26 0.43 11803.00 154.0 9611.57 5695.29 42.10 176.00 - 5541.47 1338.10 5700.7; 166.42 0.78 ** * * *** ** ** * * * *:i *. * *** *** ** ` PAGE NO. 1 *me**** *******##* ********* ANAURI1L ********** ********* SCHLUMBERCER ********** ******** ********** **************o******************»************************* ****me**** SURVEY 4ALYSIS COMPANY BP EXPLORATION WELL NAME MPI 1-63/T-22 LOCATION 1 SNDICO?T MPI LOCATION 2 NORTH SLOPE ALASKA DATE: 14-FEB-89 MAGNETIC DECLINATION 31^05 WELL NUMBER 63 PAGE N0. 2 1 • * * * * *. -! *** ANADRILL * * * * * *** *** * ** SURVEY ANALYSIS ** *** RADIUS OF CURVATURE METHOD******** r. rrl ,off fTLt . -� r=. rar. , f!f „I -,. , r w r CLOSURE , Mn � •' •, w.• r' S MD `I �0 :.NC CHG i_JIT . 0HG RA r+7I'!_f_�zG i�JI"t L.n CHG TURN RATE � LOSURE OOL FHCE _ :.;� z+LSRT ft ft deg deg deg /100ft deg deg deg/10Oft ft deg deg /10Oft deg/100f t * *2 0.0 0.00 0.000 0. 00 0.00 0.00 0.0 0.00 0.00 0.00 0.00 0.00 450.0 450+00 0.25 0.25 0 ►06 158.00 158.00 35.11 0.64 0.00 0,05 0.01 532.0 521.99 1.25 1.50 1.52 21.00 179.00 25.61 0.65 2 24.45 1.55 1.32 623.0 622.91 1.75 3. 1.92 -10.00 169.00 - 10.99 0.32 18.30 1.97 0.' 1084.0 1082.45 2.50 5.71 0.54 10.00 169.00 0.00 0.00 0 +00 0.54 0.31 1559.0 1554.73 0.75 6.50 0.16 6.00 175.00 1.26 -2.44 43.48 0.21 0.07 +'4 � rV ' 7 •7 1 fi r• n r i • 7 r. ''4 A /" 2063.0 i 1_ +7 4 -0.50 6.00 -0.10 1.00 17 :.00 0.20 C. 1'68 +40 0.10 0.02 2476.0 2466.83 -1.00 5.00 -0.24 3.00 179.00 0,73 -14.61 165.46 0.25 0.04 2711.0 2700.95 -0.10 4.90 -0.04 11.00 190.00 4.68 - 20.04 101.47 0.41 0.07 31250 +0 3108.69 -0.80 4.10 -0.20 -3.00 187.00 -0.73 0.28 0.00 0.20 0.05 3308.0 3266.00 1+60 5.70 0.85 -9.00 178.00 -4.79 -• 3 ►18 30 ►16 0.94 0.39 3403.0 3390.36 1.80 7.50 1.89 - 10.00 168 +00 -10.53 -33.96 37.58 2.24 1.37 3498.0 348 1+70 9.2 1., ? -6.00 162 +00 -6.32 -33.01 30.13 .2.31 0.24 0 592 0 3577 'St' 1 702 11.10 2 5 i 5 F n n ? n >11 ,}.L ,:�. 7 r� _' .. ,t 11.18 2.00 -4.00 L.tu. �U `4.21 -30.41 22.31 2.13 0.13 3688.0 3670.73 2.10 13.20 2+21 3.00 161.00 3.16 -30.74 165.19 2.31 0.18 375/.0 373/ +66 1.70 14.90 2.46 0 +00 161.00 0.00 -24.83 0.00 2.46 0.23 3890.0 3864 8 00 15,90 5.00 166.00 3 +76 -21.49 35.43 1.25 0.91 4017.0 3987.68 1.101 17.00 0.87 4.00 170.00 3.15 - 20.90 47.76 1.24 0.00 i��,'."! 1i / S ( ' S i i i n '1 t 4 t ' -2 'i •' n ♦ r, t' n 4133.0 409 +71 2.7• 1 .50 -3.00 168.00 _.59 -20. .E 17.55 2.63 1 ♦20 :! ^ ^.� ! tF•j C r ., „ •.n �2 h 2 , nn 2 f i _'} 1 n n2 4228.0 4186.24 2.70 22.60 +84 -2.00 165.00 -2.11 -27.14 118.19 2.94 0.33 4354.0 4341..02 3.50 26.10 2,7 8. 0.00 165.00 0.00 -15.31 0.00 2.78 0.13 4576.0 4496.15 4.70 30.30 2.12 1.00 166.00 0.45 -8.98 6.22 2.13 0.29 'Yr�! ^ �- �i 4.50 n r.r .� n t a +�• C ,} 1 � n 111 4i n.0 46 0.51 4.50 35.30 2.05 -1.00 - 145.00 -0.45 -1.80 7433 2.36 0.03 r� '�•t e C n n en • •, 38.93 _ 8/.0 4:15.77 1.50 36 +80 0.52 2.00 167.00 0.69 6.95 38.93 0.66 0.48 5276.0 5046 +72 0.40 37. 0+21 0.00 167+00 0.00 -18.87 15.95 0.21 0.23 5 44 + 5217.36 -0 10 37+10 � _3 } . 0 -' 59 17 .6 1 0.96 J J +L . 0 -J.'<5 -3.00 1344 vO 1. Jt at r r 4 ►�J 0.40 C 1 e-rt � r. -r , s nr� i '1 + =n n r „ =17 �! , 5':31 +0 5348.25 1 �0 33 0 1.02 -1.00 162.00 -0 60 _7 7 20 r7 1 509 048 5851.0 5511.13 6.80 45 +60 3.09 0+00 1 63 . 00 0.00 42.52 0.00 3.09 0.91 6001.0 561 1.00 46.60 0.67 1.00 16.4.00 0 +67 52.75 36.10 0.82 1.51 � r �.? / .0 - i t n e x + 6 91. 57 46.65 -0.80 4 }.80 -3.42 -1 +00 163.00 - 0.53 10.78 1.05 0.57 0.13 6181 +0 5879.47 -0.30 45.50 -0.16 1.00 164 +00 0.53 78.58 113.12 0.41 0.08 6571+0 601%35 35 -0.60 44.90 - 0 .32 0.00 164.00 0.00 90.17 0.00 0 +32 0.05 6761.0 6148 +28 -0+30 44.60 -0.16 1.00 - 165 +00 0.53 100.50 113.45 0.40 0.05 6956.0 6286.77 0.30 44.90 0.15 -2.00 163.00 -1.03 112.30 78.68 0.74 0.17 7205.0 6461.29 1.20 46.10 0.4"1 1.00 164.00 0.40 65.73 138+32 0.56 0+07 7394.0 6591.87 0.40 46.50 0.21 0.00 164.00 0.00 140.84 0.00 0.21 0.18 7 6764.89 1.20 47 0 47 1 ' � 65.00 0. 155 16 21 73 5 .56 + 1 + 1.00 1 40 74,41. .� ./ •� 0 0 4 7838.0 6392.38 0.20 47.90 0.10 2.00 167.00 1.05 162.39 82.98 0,78 0.12 n nr �,r.n t �n w n 6028.0 7 01.0.;;1 -0.20 47.70 -0.11 0.00 167.00 0.00 167.3 0.00 0.10 0.36 8216.0 71 -0.60 47.10 -0.32 1 +00 168.00 0.53 129.10 31.0E 0.50 0.21 PAGE 14O. 3 LSD 9606 +0 8103.16 8223.70 9! 1 - , r 9 +0 832°.05 10110.0 8457.15 10309.0 8590.82 TV6 IMC CHG ft deg 3375.0 7256.00 -0.50 8629.0 7430+52 0.00 016.0 769=++'6 0.80 922..0 7833.09 -0 +60 a i/ n �rtt�� � i 1�] -1,20 9414 .0 796 .52 4-r t� - t'��•; r• 10522.0 8, :i0 +a.4 0.90 10743.0 8873,66 -0420 10900.0 89'6 + 66 -0.30 j a ^u'� t err rrr i.+3 1108 .0� :102,0: -0.'0 11278.0 9222.03 -1.70 11463.0 9 363.18 -2.30 11576.0 0 9 30 t: 3 -0.20 11649.0 9498.21 -0.40 11803.0 9611 +57 -1 +00 l„, *****,m****** ANADRI *** * * * * ** *� * ** SURVEY ANALi3IS .f * * ** RADIUS OF CURVATURE METHOD * * * * * * ** CUMIK_CHG IRATE AZM CHG OUMAL;t CHG TURN RATE CLOSURE TOOL FACE )LS DLSRT lea lea /100ft deg lea 1dag /100ft ft :tea dea /100ft de+ /100ft * *2 4 6.60 -0;31 -2.00 146,00 -1,26 46.60 0.00 -1+00 165.00 -0.39 47.40 0.21 0.00 165.00 0.00 46.80 -0.28 1.00 164.00 -0.47 0.00 n 4 -0 + 64 1..001 64.0 f 0.00 - 1.10 44.50 -0.57 0.00 164.00 0 +00 0.00 44 +50 0.00 0.00 164.00 0.00 1.30 45.80 0.88 0.00 164.00 0.00 1 +11 48 0 4 0.59 1.00 165.00 0 +53 1.80 48.70 0.90 2.00 147.00 1.01 49,r0 0s42 1.00 168.00 '1.'t! 49 +40 -0.09 0 +00 165.00 0.00 4 3,60 0. 1.00 1 69.00 0.6 47.70 0 -0.48 0.00 169.00 0.00 A6.00 -0.39 2.00 1 1.1f 43+70 -1.24 3.41• 174 +J0 1.62 43,70 -0 +22 1.00 175.01 1.08 43.10 -0.43 0.00 175.00 0 0.00 �r3 � -0.65 i ? n C 42,10 -0.65 1.00 1: . 00 0.65 IFI 1- 63 /T -rL 174.49 109.60 185.53 90.34 204.93 040 216.87 129.67 170.56 129.53 2240.15 h 7 259.34 269.79 228.47 281.35 284.08 284.9! 284.80 277.33 it i rn 179.93 90.00 0.00 32.66 179.46 40.35 0.00 137.01 0.00 40.13 27 4.08 138+45 267.86 106.54 261.11 175.83 249.19 146 +28 0.97 0.29 0.21 i 0.45 0.,;4 0,29 0.27 0.02 0.11 0.10 0.57 0.04 0 +00 0.34 0.38 0.59 0.70 0.09 1.17 0.23 0.35 0 +29 0.09 0.21 0.70 :! 0. 9 0.48 0.12 1 +18 0.37 1.69 0,28 0.77 0.99 0 0 +43 0.37 0 +78 0.23 *ice* ** ***.X#***** *: * ** ** * * * * * * ******4 *l * * **** ** :* * * ** **** * * * ** * *** ***** ****** *** * *********** * *** ****** ** *** **** GREAT LAND DIRECTIONAL DRILLING INC. REPORT OF SUB - SURFACE DIRECTIONAL SURVEY BP EXPLORATION COMPANY MPI # 1- 63/T -22 WELL NAME ENDICOTT LOCATION AL189 -D2 SINGLE SHOT & MWD 2/17/89 JOB NUMBER BRIAN WEST NAME DEPTH INTERVAL CROF1LMED TYPE SURVEY DIRECTIONAL SUPERVISOR DATE TITLE SIGNATURE 450 FT 11803 FT FROM TO 1/25/89 2/14/89 DATE SURVEY TAKEN FROM TO THIS IS A RECORD OF A SUB - SURFACE SURVEY OF YOUR WELL WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE AND ARE HELD IN STRICTEST CONFIDENCE. 1 yasla & z'.s GAS e coov' 1559 2063 2476 2711 3120 3308 3403 3498 3593 3688 3757 3890 4017 4133 4228 4354 4576 4796 5087 5276 GREAT LAND DIRECTIONAL. DRILLING,INC STANDARD ALASKA PRODUCTION CO. - MPJ 11 1-63/T-22 5 11.07 E 31 deg 18 min E B:MT22D.DAT Client Well Vertlea] Section at.: Magnetic Declination: Data file name MEAS DRIFT TRUVFRT SUBSEA DEPTH DG MN DEPTH DEPTH 0 00 450 0 15 53? 1 30 623 3 15 1048 5 45 6 30 60 50 4 54 46 0.00 -56.00 450.00 394.00 531.99 475.99 622.91 566.91 1046.56 990.56 1554.64 1498.64 2055.64 1999.64 2466.74 2410.74 2700.86 2644.86 3108.60 3052.60 5 42 3295.90 3239.90 7 30 3390.27 3334.27 9 12 3484.26 3428.26 11 6 3577.77 3521.77 13 12 3670.64 3614.64 14 54 15 54 17 0 19 54 22 36 3737.57 3681..57 3865.79 3809.79 3987.59 3931.59 4097.62 4041.62 4186.15 4130.15 26 6 4300.92 4244.92 30 48 4496.06 4440.06 35 18 4680.41 4624.41 36 48 4915.68 4859.68 37 12 5066.62 5010.62 RECORD OF SURVEY (Well assumed vertical to MO of SECTION 01 ST 0.00 0.96 2.21 5.96 39.30 93.72 148.23 187.37 206.87 237.44 253.17 264.05 277.79 294.31 314.03 330.62 365.77 401.72 438.42 472.80 524.62 630.16 749.89 920.91 1034.59 DIRECTION ANGLE S 0.00 E S 22.00 E 5 1.00 E S 11.00 E 5 11.00 E .9 5.00 F S 4.00 E S 1.00 E .9 10.00 W 3 3.00 W 5 5 2.00 12.00 19.00 22.00 19.00 19.00 14.00 10.00 13.00 15.00 15.00 14.00 15.00 13.00 13.00 RELATIVE COORDINATES CLOSURE FROM WELL-HEAD DISTANCE 0.00 ('1 0.91 5 2.13 S 5.88 S 38.61 S 92.57 5 147.27 S 186.81 S 207.00 S 238.86 S E 254.91 E 265.74 E 279.02 F 294.70 F 313.43 E 329.26 F 363.12 E 398.29 E 434.25 E 467.66 E 517.83 E 620.19 E 736.32 F 902.47 E 1013.30 Computation: RADIUS OF CURVATURE Survey date: 1/30/89 Method - SINGLE SHOT & MWD RKB Height.: 56.0 ft 0.0) 0.00 E 0.37 E 0.62 F 1.01 F 7.37 F 14.96 E 19.26 F 20.99 E 19.40 E 15.77 F • 15.63 F • 16.96 F .9 20.64 F S 26.50 F 5 33.51. F S 38.96 F S 48.99 E 5 56.46 E S 63.78 E S 72.11 E S 85.55 F 5 112.02 F S 142.06 F 3 183.48 F 5 209.07 F 0.00 0.98 2.22 5.96 39.30 93.77 148.53 187.99 207.90 239.38 255.39 266.28 279.78 295.89 315.21. 331.56 366.41 402.27 438.91 473.18 524.85 630.23 749.90 920.93 1034.64 2/17/85 DOG LEE DG MN S deg/10C S 0 0 OE 0.000 522 0 0 E 0.05 S 16 7 38 E 1.524 S 9 45 1E 1.922 5 10 48 38 F 0.58F 5 9 10 39 F 0.14P S 7 27 4E 0.095 S 6 24 36 F 0.24F S 5 21 14 F 0.05F S 3 46 37 F 0.196 S 3 30 30 F 0.851 S 3 39 SE 1.903 .9 4 13 52 E 1.795 S 5 8 21 F 2.003 3 6 6 6F 2.21 S 6 44 52 E 2.464 S 7 40 59 E 0.803 5 8 4 7E 0.907 5 8 21 19 E 2.5119 S 8 45 55 F 2.859 S 9 22 52 E 2.778 5 10 14 20 F 2.120 S 10 55 11 E 2.051 S 11 29 3? F 0.571 5 11 39 29 F 0.21 MPI V 1-63/T-22 MFAS DRIFT TRUVERT SURSFA SECTION DEPTH DG MN DEPTH DEPTH DIST 5465 37 6 5217.27 5161.27 5631 38 48 5348.16 5292.16 5851 45 36 5511.04 5455.04 6001 46 36 5615.05 5559.05 6191 45 48 5746.56 5690.56 6381 45 30 5879.38 5823.38 6571 44 54 6013.26 5957.26 6761 44 36 6148.19 6092.19 6956 44 54 6286.68 6230.68 7205 46 6 6461.20 6405.20 7394 46 30 6591.78 6535.78 7647 47 42 6764.00 6708.00 7838 47 54 6892.29 6836.29 8028 47 42 7019.92 6963.92 8216 47 6 7147.17 7091.17 9606 44 30 8103.07 8047.07 9775 44 30 8223.61 81.67.61 9923 45 48 8327.98 8271.98 1011.0 46 54 8457.06 8401.06 10309 48 42 8590.73 8534.73 10522 49 36 8730.04 8674.04 10743 49 24 8873.57 8817.57 10900 48 36 8976.57 8920.57 1.1.088 47 42 9102.00 9046.00 11278 46 0 9231.94 9175.94 1148.51 1250.13 1397.03 1504.63 1641.14 1776.40 1910.72 2044.08 2180.84 2357.64 2494.08 2679.22 2820.52 2961.19 3099.53 8375 46 36 7255.91 7199.91 3215.46 5 14.00 F 8629 46 36 7430.43 7374.43 3399.77 5 14.00 E h.„ 9016 47 24 7694.37 7638.37 3682.29 5 15.00 E 9227 46 48 7838.00 7782.00 3836.39 5 16.00 E 9414 45 36 7967.43 7911.43 3970.86 5 16.00 F 4106.24 4224.25 4328.79 4463.69 4610.90 4771.97 4939.99 5058.48 5198.52 5337.10 RECORD OF SURVEY DIRECTION ANGLE • 16.00 E • 17.00 E .9 17.00 E S 16.00 E • 17.00 F • 16.00 E • 16.00 E .9 15.00 F S 17.00 E • 16.00 F 5 12.00 E S 15.00 E • 13.00 F • 13.00 E S 12.00 E • 1.6.00 E S 16.00 F S 1.6.00 F • 15.00 F 5 13.00 E 5 12.00 F • 12.00 E 5 11.00 E S 11.00 F • 9.00 E RELATIVE COORDINATES FROM WELL-HEAD 1123.79 S 1221.66 S 1362.90 S 1466.53 1598.02 1728.28 5 1857.88 S 1986.78 S 2118.73 S 2289.01 2421.57 5 2601.76 S 2739.04 2876.19 3011.29 3124.31 3303.38 S 3577.39 .5 3726.34 5 3856.07 S 237.64 F 266.64 E 309.82 E 340.51 E 379.46 E 418.05 F 455.21 F 490.96 E 528.79 E 579.23 F 612.28 E 655.54 E 689.77 E 721.43 E 751.39 E 777.48 E 822.13 E 892.99 F 934.30 F 971.50 E 3986.69 S 1008.95 E 4100.56 S 1041.60 F 4201.41 S 1070.52 E 4331.80 5 1106.68 F 4474.83 5 1142.34 E 4632.1.2 5 1177.21 E 4796.50 S 1212.15 F 4912.61 5 1235.77 E 5050.07 S 1262.50 E 5186.57 S 1286.56 E CLOSURE DISTANCE DG MN S 1148.64 5 1.1 56 25 E 1250.42 S 12 18 44 F 1397.67 S 12 48 25 F 1505.54 S 1.3 4 19 F 1642.45 S 13 21 29 E 1778.13 3 13 35 52 F 1912.83 5 1.346 2 E 2046.54 5 13 52 49 F 2183.73 5 1.4 0 49 F 2361.16 S 1.4 12 2 E 2497.78 S 14 11 23 F 2683.07 5 1.4 8 31 F 2824.56 S 14 8 5 F 2965.29 S 14 4 52 F 3103.62 5 14 0 38 E 3219.60 5 13 58 27 E 3404.15 5 1.3 58 32 F 3687.16 5 14 0 57 F 3841.68 S 14 4 32 F 3976-97 5 14 8 27 E 4112.38 5 14 12 8 F 4230.78 5 14 15 9 F 4336.65 S 14 17 41 F 4470.93 S 14 19 53 E 4618.33 3 14 19 15 F 4779.37 5 14 15 34 E 4947.29 5 1.4 10 57 E 5065.65 3 14 7 12 E 5205.49 5 1.4 2 10 E 5343.76 5 13 55 53 E 2/17/89 DOG L.EC deq/100 0.580 1.051 3.091 0.754 0.500 0.311 0.316 0.304 0.534 0.525 1.134 0.804 0.586 0.105 0.428 0.735 0.000 0.250 0.380 0.642 0.573 0.000 0.878 0.654 1.068 0.503 0.090 0.623 0.479 1.047 MPJ # 1-63/T-22 2/17/89 11463 43 42 9363.09 9307.09 11556 43 54 9430.21 9374.21 1.1649 43 6 9497.67 9441.67 1.1803 42 6 9611.03 9555.03 MFAS DRIFT TRUVERT SUBSEA SECTION DIRECTION RELATIVE COORDINATES CLOSURE DEPTH DG MN DEPTH DEPTH DIST 5467.29 .9 5531.36 S 5595.02 .9 5698.57 S RECORD OF SURVEY ANGLE FROM WELL-HEAD DISTANCE DG MN S 6.00 E 5315.90 S 5.00 E 5379.98 5 5.00 F 5443.75 S 4.00 E 5547.66 5 1303.59 F 1309.76 F 1315.34 F 1323.5? F 5473.41 S 13 46 42 F 5537.11 S 13 40 57 F 5600.40 5 13 35 1 F 5703.36 5 13 25 6 F DOG LEC deg/100 1.46F 0.560 0.860 0.71F MPI # 1-63/T-22 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH MEAS. TRU VERT SUR SFA MD-TVO VERTICAL RELATIVE COORDINATES DFPTH DFPTH DEPTH DIFF. CORRFCT FROM WELL-HEAD 56 56 0 0 0 0.11 5 0.05 F 156 156 100 0 0 0.32 S 0.13 F 256 256 200 0 0 0.52 S 0.21 F 356 356 300 0 0 0.72 5 0.29 E 456 456 400 0 0 1.00 S 0.39 F 556 556 500 0 0 3.12 5 0.72 F 656 656 600 0 0 8.43 S 1.51 E 757 756 700 1 1 16.16 S 3.01 F 857 856 800 1 0 23.88 5 4.51 F 957 956 900 1 0 31.61 S 6.01 E 1057 1056 1000 1 0 39.61 5 7.51 F 1158 1156 3.100 2 1. 50.23 S 9.01 E 1259 1256 1200 3 1 60.85 5 • 10.50 F 1359 1356 1300 3 0 71.475 11.99 F 1460 1456 1400 4 1. 82.10 S 13.48 F 1560 1556 1500 4 0 92.72 5 14.97 E 1661 1656 1600 5 1 103.64 5 15.83 F 1762 1756 1700 6 1 114.56 5 1.6.69 F 1862 1856 1800 6 0 125.47 S 1.7.55 F 1963 1956 1.900 7 1 136.39 5 18.40 E 2063 2056 2000 7 0 147.31 S 19.26 F 2164 2156 2100 8 1 156.92 5 19.68 F 2264 2256 2200 8 0 166.54 5 20.10 F 2365 2356 2300 9 1 176.16 5 20.52 E 2465 2456 2400 9 0 185.78 S 20.94 E 2566 2556 2500 10 1. 194.51 5 20.38 F 2666 2656 2600 10 0 203.13 5 19.70 F 2766 2756 2700 10 0 211.31 5 18.91. F 2867 2856 2800 11 1 219.12 5 18.02 F 2967 2956 2900 11 0 226.94 5 1.7.13 E 2/17/89 MPJ # 1-63/T-22 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH MEAS. TRU VFRT SUR SFA MO-TVD VERTICAL RELATIVE COORDINATES DEPTH DFPTH DEPTH DIFF. CORRECT FROM WELL-HEAD 3067 3056 3000 11 0 234.75 S 16.24 F 3168 3156 3100 12 1 242.92 5 15.73 F 3268 3256 3200 12 0 251.49 S 1.5.66 F 3368 3356 3300 12 0 261.81 .9 16.47 F 3469 3456 3400 13 1 275.03 S 19.53 F 3571 3556 3500 15 2 291.05 S 25.14 F 3673 3656 3600 17 2 310.47 5 32.40 F 3776 3756 3700 20 3 334.13 S 40.40 F 3880 3856 3800 24 4 360.53 S 48.22 F 3984 3956 3900 28 4 389.16 S 54.52 F 4089 4056 4000 33 5 420.65 S 61.01 F 4196 4156 4100 40 7 456.28 5 69.27 F 4305 4256 4200 49 9 498.19 S 80.29 F 4417 4356 4300 61 12 546.72 5 93.02 E 4530 4456 4400 74 13 599.18 5 106.59 E 4648 4556 4500 92 18 657.95 .9 121.79 F 4767 4656 4600 111 19 720.94 S 138.08 E 4889 4756 4700 133 n x 789.70 5 3.55.37 F 5013 4856 4800 157 24 860.32 3 172.97 E 5137 4956 4900 181 24 932.07 5 190.32 F 5263 5056 5000 207 26 1005.50 3 207.27 F 5388 5156 5100 232 25 1078.85 S 226.02 E 5514 5256 5200 258 26 1152.75 3 246.22 F 5642 5356 5300 286 28 1228.46 8 268.71 F 5777 5456 5400 321 35 1315.17 S 295.23 E 5916 5556 5500 360 39 1407.70 3 323.09 E 6060 5656 5600 404 44 1507.47 S 352.64 E 6205 5756 5700 449 45 1607.28 S 382.20 E 6348 5856 5800 492 43 1705.36 S 43.1.26 F 6490 5956 5900 534 42 3.802.46 5 439.32 F 2/17/89 MPJ if 1-63/T-22 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH MEAS. TRU VERT SUB SFA MD-TVD VERTICAL RELATIVE COORDINATES DEPTH DEPTH DEPTH OJFF. CORRECT FROM WELL-HEAD 6631 6056 6000 675 41 1898.71 S 466.63 E 6772 6156 6100 616 41 1994.22 S 493.09 F 6913 6256 6200 657 41 2089.50 S 520.41 F 7055 6356 6300 699 42 2186.37 S 548.83 F 7198 6456 6400 742 43 2283.94 S 577.73 E 734? 6556 6500 786 44 2385.25 S 603.23 F 7488 6656 6600 832 46 2488.77 S 628.42 F 7635 6756 6700 879 47 2593.39 S 653.53 F 7784 6856 6800 928 49 2700.21 S 680.09 E 7933 6956 6900 977 49 2807.50 S 705.58 E 8081. 7056 7000 1025 48 2914.49 S 729.93 F 8229 7156 7100 1073 48 3020.47 S 753.50 F 8375 7256 7200 1119 46 3124.40 S . 777.50 E 8521. 7356 7300 1.165 46 3227.01 S 803.08 F 8666 7456 7400 1210 45 3329.92 S 828.99 F 8813 7556 7500 1257 47 3433.74 S 855.84 F 8960 7656 7600 3.304 47 3537.56 S 882.69 F 9107 7756 7700 1351 47 3641.31 S 910.71 E 9253 7856 7800 1397 46 3744.38 S 939.47 E 9397 7956 7900 1441 44 3844.62 3 968.21 E 9539 8056 8000 3.483 42 3941.37 S 995.95 F 9680 8156 8100 1524 41. 4036.69 S 1023.29 F 9821 8256 8200 1665 41 4131.86 S 1050.58 E 9964 8356 8300 1608 43 4229.71 S 1078.37 E 10108 8456 8400 1662 44 4330.73 S 1106.38 F 10257 8556 8500 1.701 49 4437.67 S 1133.08 F 1 8656 8600 1.753 52 4548.52 S 1158.68 F 1056? 8756 8700 3.806 53 4661.85 S 1183.53 F 10716 886 8800 1860 54 4776.37 S 1207.87 F 10869 8956 8900 1913 53 4889.42 5 1231.06 E 2/17/89 MPI # 1-63/T-22 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH MEAS. TRU VERT SUB SEA MO-TVD VERTICAL RELATIVE COORDINATES DEPTH DEPTH DEPTH DJFF. CORRECT FROM WELL•HEAD 11019 9056 9000 1963 50 4999.66 S 1252.70 E 11167 9156 9100 2011 48 5106.80 S 1272.50 E r 11312 9256 9200 2056 45 5210.30 S 1289.69 E , 1.1.453 9356 9300 2097 41 5308.92 S 1302.67 F 11.592 9456 9400 2136 39 5404.36 S 1311.89 E 1 9556 9500 2172 36 5497.22 5 1319.55 F 2/17/89 MPI # 1-63/T-22 2/17/89 DATA INTERPOLATED FOR EVEN 1000 FFFT OF MEASURED DFPTH MEAS. TRU VFRT SUB SFA RELATIVE COORDINATES DEPTH DEPTH DEPTH FROM WELL-HEAD 3 999 943 34.91 S 6.65 F 2000 1993 1937 140.43 S 18.72 F 3000 2989 2933 229.51 S 16.83 F 4000 3971 3915 393.58 5 55.46 F 5000 4845 4789 852.80 S 171.10 F 6000 5614 5558 1465.84 S 340.31 F 7000 6318 6262 21.48.82 S 537.71 E 8000 7001 6945 2855.98 S 716.77 E 9000 7683 7627 3566.06 5 890.06 F 10000 8381 8325 4255.10 5 1085.41 E 11000 9043 8987 4985.73 3 1249.99 F 6?8,1` to'/7f!'81 ief/`IO1 el .Z71.j.fJ& VERTICAL SECTION BP EXPLORATION MPI # 1- 63/T -22 SECTION AT S 11.07 E TVO SCALE : 1 inch = 1200 feet DEP SCALE : 1 inch a 1200 feet DRAWN : 2/17/89 600 1.200 1600 2400 3000 3600 4200 T 4800 5400 D 6000 6600 7200 7800 8400 9000 9600 10200 10800 1 Marker Identification MO TVO DEPRT 8) TO 11803 9611 5699 ----. -.- —600 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 6600 Departure 6?8,1` to'/7f!'81 ief/`IO1 el .Z71.j.fJ& 500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 500 Marker Identification Al KB 14 TD 0 500 1000 ducat id /g, J'taci`J 87WJJ »g MD TVD DEPRT 0 0 0 11803 9611 5699 1500 2000 2500 3000 3500 HORIZONTAL VIEW BP EXPLORATION MPI # 1- 63/T-22 CLOSURE: 5703 ft S 13,4 E DECLINATION: 31.30 deg E SCALE : 1 inch = 1000 feet DRAWN : 2/17/69 4000 4500 5000 5500 t t t t t t t I t t t t t t I t 1 t t t t t S t t t 1 t t , 8 t t it t 500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 500 Marker Identification Al KB 14 TD 0 500 1000 ducat id /g, J'taci`J 87WJJ »g MD TVD DEPRT 0 0 0 11803 9611 5699 1500 2000 2500 3000 3500 HORIZONTAL VIEW BP EXPLORATION MPI # 1- 63/T-22 CLOSURE: 5703 ft S 13,4 E DECLINATION: 31.30 deg E SCALE : 1 inch = 1000 feet DRAWN : 2/17/69 4000 4500 5000 5500 BP EXPLORATION March 15, 1989 John Boyle Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: Endicott Well Log Information Dear Mr. Boyle: Enclosed please find one L.I.S. (data format) tape and computer read -out sheet for the open hole run in the following Endicott wells: Sincerely, n n '-r r � i -63/ i -22 1 50 029 21905 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519 -6612 (907) 561 -5111 15 MAR 2 1 198 Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION March 9, 1989 John Boyle Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Boyle: Enclosed please find one sepia and one blueline print for the open hole well logs run in the following Endicott wells: WELL 1- 63/T -22 Sincerely, *DUAL LATEROLOG 11350' - 13044' Run No. 1 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519 -6612 (907) 561 -5111 *SPECTRAL LITHO - DENSITY COMPENSATED NEUTRON LOG 11790' - 13046' Run No. 1 *FORMATION TESTER WITH REPEAT PRESSURE TEST 12588' - 13196' Run No. 1 Logged by Halliburton Logging Services. J??,-tg Gregory N. Dillard 8 Alaska oil & Gas Cons. Commission Anchorage BP EXPLORATION March 8, 1989 Dear Mr. Boyle: WELL 1- 63/T -22 n John Boyle Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Enclosed please find one sepia and one blueline print for the cased hole well logs run in the following Endicott well: *CEMENT EVALUATION LOG (CET) 11448' - 13106' Run No. 1 *CEMENT BOND LOG (CBT) 11448' - 13087' Run No. 1 Logged By Schlumberger Sincerely, Gregory N. Dillard BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519 -6612 (907) 561 -5111 THRU: 02 -001A (Rev. 8/85) MEMCRAtJ DU M SKA OIL A TO: Lonnie C Smith Commissioner Michael T Minder 0 Sr Petroleum Engineer FROM: Bobby D Foster Petroleum Inspector In summary, I witnessed the Attachment DATE: FILE NO: TELEPHONE NO: SUBJECT State of Alaska GAS CONSERVATION COMMISSION February 23, 1989 D.BDF.169 BOP Test SAPC DIU 1- 63/T -22 Permit #89 -06 Endicott Field Monday, January 30, 1989: The test began at 5:00 p.m. and was completed at 7 :00 p.m. As the attached BOP test report shows, there were no failures. p test on SAPC 1- 63/T -22. 0 &G 04 5/84 Inspector Reserve Pit Mud Systems Test Results: Trip Tank Pit Gauge Flow Monitor Gas Detectors BOPE Stack Annular Preventer Pipe Rams Blind Rams Choke Line Valves H.C.R. Valve Kill Line Valves Check Valve Operator 5 6p Well 1 - N// Failures 0 Distribution orig. — A0 &GCC cc — Operator cc — Supervisor 1 STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.E. Inspection Report Date Representative Permit !1 49 Location: Sec T /;. 4 M O // Casing Set @ ,'►jnt2 f Drilling Contractor) y ,1J . Rig #1 Location, General J Well Sign General Housekeeping C_- Rig Visual Audio Test Pressure 3o60 380-0 Zoo ms • Re Upper Kell / Lower Kell Ball Type Inside BO Choke Manifold No. Valves /7 No. flanges _ 3(2y Adjustable Chokes resentative ACCUMULATOR SYSTEM Full Charge Pressure �6 e- �J psig Pressure After Closure /...54—t psig Pump incr. clos. pres. 200 psig -- min2c/ sec. Full Charge Pressure Attained: 3 mint? sec. N ° .7d- 3 :� 3 CV psig Controls: Master 1 e_ Remote 67 �?$_ Blinds switch coverl� e��- -- Kelly and Floor Safety Valves / Kelly Test Pressure Kelly Test Pressure Test Pressure BOP Test Pressure Hydrauically operated choke / Test Time hrs. Repair or Replacement of failed equipment to be made within ' days and Commission office notified. Remarks: arPob 30-0 toe) Test Pressure 5 Inspector/ January 17, 1989 J Grant Vidrine Endicott Drilling Engineering Supervisor Standard Alaska Production Company P.Q. Box 196612 Anchorage, Alaska 99519-6612 Re: Duck Island Unit/Endicott 1-63/T-22 MPI Standard Alaska Production Company Permit No. 89-06 Sur. Loc. 2213'SNL, 2213'WEL, Sec. 36, T12N, R16E, UM. Btmhole Loc. 3709'SNL, 914'WEL, Sec. 1, T11N, R16E, UM. Dear Mr. Vidrine: Enclosed is the approved application for permit to drill the above referenced well The permit to drill does not indemnify you from the probable need to obtain additional permits required by law from other governmental agencies prior to commencing operations at the well site. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. C. V. Chat t n Chairman of Alaska Oil and Gas Conservation Commission BY ORDER OF THE COMMISSION dlf Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Telecopy: (907)276-7542 1 a. Type of work Drill E Redrill • Re -Entry • Deepen • lb. Type of well. Exploratory • Stratigraphic Test D Development Oil Service • Development Gas • Single Zone in Multiple Zone 0 2. Name of Operator Standard Alaska Production Company 5. Datum Elevation (DF or KB) BKB =56 feet 10. Field and Pool Endicott Field /Endicott Pool 3. Address P. O. Box 196612, Anchora_ge,Alaska 99519 -6612 6. Property Designation ADL 34636 4. Location of well at surface 2213' SNL, 2213' WEL, SEC. 36, T12N, R16E At top of productive interval 2875' SNL, 1050' WEL, SEC. 1, T11 N, R16E At total depth 3709' SNL, 914' WEL, SEC. 1, Ti 1 N, R16E 7. Unit or property Name Duck Island Unit/Endicott 11. Type Bond(see 20 AAC 25.025) Number K00683449 -G -14 Amount $200,000.00 8. Well number 1- 63 /T-22 MPI 9. Approximate spud date January 24,1989 12. Distance to nearest property line ADL 47502 914 feet 13. Distance to nearest well 1-57/R-23 30 feet 14. Number of acres in propertyl5. 2560 Proposed depth (MD and TVD) 13708' MD 10906' TVDfe et 16. To be completed for deviated wells Kicko depth 3200 feet Maximum hole angle 45.7° 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Maximum surface 3900 psig At total depth (TVD)985574840 prig 18. Ca 'ng program size Specifications Setting Depth Quantity of cement Top Bottom Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" Struct. Drive \ Pipe 75 Surface 131' 131' Drive 17 -1/2" 13 -3/8" 68# NT -80 Butt 2444 Surface 2500' 2500' 2700 cu ft Permafrost 12 -1/4" 9 -5/8" 47# NT8OS NSCC 10209 Surface 10265' 8500' 12 -1/4" 9 -5/8" 47# NT95H NSCC 1554 10265' 8500' 11819' 9586' 575 cu ft Class G 8-1/2" 7" 29# SM110 Butt 2139 11569' 9411' 13708' 10906' 644 cu ft Class G 19. To be completed for Redrill, Re- entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface Intermediate RECEIV Production Liner . r• " z Perforation depth: measured is; 1 1 ) a; .1.; true vertical i CO Commission 20. Attachments Filing fee in Property plat © BOP Sketch l Diverter Sketch • 1 r•; •7 Drilling fluid program © Tim- vs epth plot • Refraction analysis • Seabed report • 20 AAO i -,'• ►'- 4 uirements • 21. 1 hereby certify p. , 1 o e i is true and correct to the best of my knowledge Signed 1 9 Si � � ` Drilling Engineering Supervisor Date ,!" g � � I Title Endicott 9 .g , g Dt P ��Q/ Commission Use Only Permit Number / 06 API number 5 0- OZg — 2 / 7c5 Approval date 01 /17/ 8 9 See cover letter for other requirements Conditions of approval Samples required • Yes XNo Mud log required • Yes Hydrogen sulfide me sures 0 Yes 0 No Directional survey required Yes • No Required worki pre s for : • ' A • 2 ; ■_13M; p5M; •10M; •15M; Other: + by Approved by j /Z��''� Commissioner the No order of commission Date ` Tali Cnrm , stn, Dell/ 10_1 _s2� Submit n ate 0 AAC 25.005 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL Objective Operation PROPOSED DRILLING AND COMPLETION PROGRAM WELL 1- 63/T -22 (MPI) Well 1- 63/T -22 will be drilled as an oil production well. Zone 3C is the primary objective. The completion will be run at the time of drilling and will consist of a simple assembly. Execute a rig move to slot 1 -63 and rig -up. Vertically drill 17 -1/2" hole to 2500 ft. and cement 13 -3/8" 68 # /ft., NT- 80CYHE Buttress casing to surface. Pressure test casing. Install BOPE. Maximum BHP is 4840 psi at 9855 ft. TVDss. Maximum possible surface pressure is 3900 psi based on a full gas column. Drill out casing and 5 ft. of new hole and conduct a formation leak -off test. Vertically drill 12 -1/4" hole to 3200 ft., then directionally drill to the intermediate casing point above the Kekiktuk formation. Run and cement 9-5/8" 47 # /ft., NT8OS and NT95HS, NSCC casing. No abnormal pressures are expected in the 12 -1/4" hole section. Pressure test casing. Drill out casing shoe. Drill 8-1/2" hole to TD. Run open hole logs. Run and cement 7" 29 # /ft, SM -110 buttress (TKC) liner to TD with approximately 250 ft. of lap in the 9 -5/8" casing. Clean out to float collar. Test casing and lap to 3000 psi. Change over to NaC1 packer fluid. Run CET /CBT/VDL /GR /CCL in 7" liner and gyroscopic survey from PBTD to surface. Perforate well under balance utilizing drill pipe conveyed guns. Flow well for simple clean -up. Kill well and complete with a simple completion. Perform MIT on completion. A sub- surface safety valve will be installed below base of permafrost. Nipple down BOPE. Install tree on wellhead and release rig. Freeze protect the 13 -3/8" x 9 -5/8" annulus with a non - freezing fluid once rig is off location. ENDICOTT PROPOSED DIAGRAM WELL 1- 63/T -22 (MPI) NON - FREEZING FLUID 30" DRIVE PIPE BASE PERMAFROST SSSV KOP ( DIR: S 11.2° E ; ANGLE: 45.7 DEG ) 3 -1/2" SLIDING SLEEVE 9 -5/8" PACKER 7" LINER TOP PLUG BACK TD 7" 29 ' /FT SM -1 10 BUTT LINER TVD (BKB) JID (BKB) 131 FT 131 FT 1466 FT 1466 FT 1550 FT 1550 FT 13 -3/8" 68"/FT NT- 80CYHE BTC 2500 FT 2500 FT BOTTOM OF FREEZE PROTECTION (ESTIMATED) 3000 FT 3200 FT REC ! \I 3 -1/2 ", 9.2 " /FT L -80 TDS TUBING • W/ 2 -7/8" TAILPIPE .1 1 : ) 1aslcaa 0i1 & Gas Cons. Commission anchorage TOP OF 9 -5/8" CEMENT (ESTIMATED) 10019 FT 9 -5/8" 47' /FT NT80S NSCC 8500 FT 10265 FT 9376 FT 1 151 9 FT 941 1 FT 11569 FT 9 -5/8" 47"/FT NT95HS NSCC 9586 FT 1 181 9 FT 10906 FT 13708 FT KRL /1 - 4 - 89 13628 FT 2 IN. KILL LINE CHECK HAND HAND • GATE GATE B.O.P. STACK CONFIGURATION 13 -5/8 IN. TRIPLE RAM STACK 5000 PSI WP DRILLING ANNULAR PREVENTER PIPE RAMS DRILLING SPOOL PIPE RAMS BLIND, 4 IN. CHOKE LINE HAND HYD. ASST. GATE GATE /CiN/ - 36 31 32 33 in Productkw Island (MPI) 1 T.12 N. 1 5 4 1 DRW NO. 116 85 SHEET 1 of 10 REV. 0 PLAT OF PROPOSED WELL LOCATIONS MPI Wells Located In See.38,T.12 E.,Untiot M. 3 DI Wells Located la $4fre. , T.11 N., R.17E., Ulai•lit M. PREPARED FOR SOHIO ALASKA PETROLEUM CO. PREPARED SY F.R. BELL • ASSOC. PRUDHOE BAY OFFICE PRUDHOE BAY, ALAS** 'MTV NOV.13,1,35 !MALE*. 1 I NILE 3 52 ) 61 62 \. 64 \.O 68 36 Oreojde �i 491'1 • ♦ 1 . ; � Gory IA. Steffens ; t I � � Ne. 4919$ , ay ‘14‘) + t mss t hlh ° �ESS�otat A dir 38 4 40 40 0 0 1) 47 5 O 53 0� 59 6561, 0 O 68670 0 O CERTIFICATE OF SURVEYOR 1 bearby certify that 1 ow properly registered and licensed to practice land surveying In the State of Alaska and that this plat represents an proposed location for the Well numbers shown above- All surveying was done by ins or under y supervision and that ell dimensions and details •re correct. DRW. 116 - 65 SHEET 2 of 10 REV. 0 *0 it 12 % 16 16 0 2 22 lb 0 0 2 ,,0 2�� j`F 34 �0 0 U O 30 41 4rt 430 0 35 3 700 1 133 0 19 23 Z0 0 27 2 ) 0 0 33 1 0 O NOTES: PREPARED FOR PREPARED BY F.R. BELL & ASSOC. PRUDHOE BAY OFFICE PRUDHOE BAY, ALASKA O Indicates well Indicates Calculated Section Corner Position Indicates Perpendicular Offset Distance Indicates Perpendicular Offset Distance ( perpendicular destoncs varies tor each well ) SCALE% I *0' h 36 PLAT Of MP1 PROPOSED WELL LOCATIONS LOCATED IN SEC. 34, T.I2 N., R. It E. UNIAT M. S O HIO ALASKA PETROLEUM CO. DATE: NO V.13, 045 DRAWN SY RAN. CHECKED SY: S.E. MELL ASP IONI 3 UTE M LATITUDE L1l 1 DI 8T ® IIIST 1 7• 5982482.37 Na 7105324.31 70°21'10.0670' 147 1920.40 2026.44 X = 2,9180.75 E= 464137.36 2 Y. 5982579.88 N 7805353.52 70 0 21'10.9814' 147 °57'24.6257• 1135.43 2168.94 X. 259041.49 E■ 464094.45 3 Y= 5982474.18 Na 7805321.98 70c21'09.9846° 147"57'20.6258" 1936.77 2032.11 X= 259175.01 E= 464135.65 4 Y= 5982571.69 N= 7805350.99 70°21'10.8991" 14757'24.7856" 1843.80 2174.41 X= 259035.76 E= 464092.74 5 Y= 5982465.99 Na 7805319.46 70c21 147c57•20.78 " 1 1 = X= 259169.27 E 464133.95 b Y= 5982563.50 N= 7805348.47 70°21'10.8168" 147 °57'24.9454" 1852.17 2179.88 X= 259030.02 E= 464091.04 7 Y= 5982457.80 Na 7805316.94 70 °21'09.8200" 147 °57'20.9455' 1953.52 2043.06 X= 259163.54 E= 464132.24 8 Y. 5982555.30 Na 7805345.94 70 °21'10.7344" 147°57'25.1053° 1860.54 2185.35 X= 259024.29 E= 464089.33 9 Y= 5982449.61 Ma 7805314.41 70 °21'09.7376' 147 °57'21.1054' 1961.89 2048.53 259157.50 E. 464130.53 10 Y. 5982547.11 M= 7805343.42 70 °21'10.6521' 147 °57'25.2651' 1868.91 2190.83 X. 259018.55 E= 46t087.62 11 Y 5982441.42 M= 7805311.89 70 °21'09.6553" 147 °57'21.2653' 1970.26 2054.00 X= 259152.07 E• 464128.83 12 Y 5982538.92 N= 7805340.90 70 °21'10.5697" 147°57'25.4250' 1877.28 2196.30 259012.82 E 464085.92 13 Y 5982433.23 4 = 7805309.36 70 °21'09.5730" 147 °57'21.4251' 1978.63 2059.47 X 259146.33 E. 464127.12 14 Y 5982530.73 N= 7805338.37 70 °21'10.4874" 147 °57'25.5849' 1885.66 2201.77 X= 259007.08 E 464084.21 15 Y= 5982425.03 Na 7805306.84 70°21'09.4906' 14757 1987.00 2064.94 X= 259140.60 E. 464125.42 16 Y. 5982522.54 N= 7805335.85 70 0 21'10.4051' 147 °57'25.7447' 1894.03 2207.24 X■ 259001.35 E■ 464082.50 17 Y. 5982416.84 M■ 7805304.31 70 °21'09.4083' 147 °57'21.7449' 1995.38 2070.41 X= 259134.16 E. 464123.71 18 Y. 5982514.35 N 7805333.32 70 °21'10.3227' 147 °57'25.9046' 1902.40 2212.71 X= 258995.61 E. 464080.80 19 Y= 5982408.65 N 7805301.79 7021'09.3260' 147°57'21.9047° 2003.75 2075.89 X= 259129.13 E= 464122.00 20 Y= 5982506.16 Na 7805330.80 70c21'10.2404" 147 °57'26.0644' 1910.77 2218.18 X= 258989.87 E= 464079.09 21 Y 5982400.46 M= 7805299.27 70 °21'09.2436' 147 °57'22.0646' 2012.12 2081.36 X= 259123.39 E= 464120.30 ` ♦�„� *, API PROPOSED WELL LOCATION LIST a: t ��� LOCATED IN SEC. 311•,T. 12 N., RAGE. UM TAT M. A . , * - * O1 PREPARED FOR ♦ » j 49TH ... I. acp, # SOHIO ALASKA PETROLEUM CO. 0 t • Gorr + p r • i No.69194 '. I DRW. NO- 11 6 - 85 PREPARED BY DATE NOV. 13, 1985 1 s j e o . n' /» -, dr ,,i;� � + SHEET HE ET 3 of 10 F.R. BELL $ ASSOC. PRUDHOE BAY OFFICE PRUDHOE BAY, ALASKA SCALE: N/A REV. 0 DRAWN CH ECKED O B R.E. eY � I.E. • 1. ASP 1011 1 YT SAT1TYYt lQ ^ TV INTO 11P 22 Y. 5982497.97 4= 251984.14 N. 7105321.27 Es 464077.38 70°21'10.1381' 147°57'26.2243 1919.15 2223.65 _ 23 Y. 5982392.27 X= 259117.65 Na 7805296.74 E. 464118.59 70 0 21'09.1613' 147 °57'22.2244' 2020.49 2006.13 24 Y 5982489.77 X= 258978.40 N= 7805325.75 . 70c21'10.0757' E= 464075.68 147c57'26.3842" 14757'22.3843" 1927.53 2229.13 2628.86 2 25 Y= 5982384.08 N= 7805294.22 70L21 0 X= 259111.92 E= 464116.88 i 26 Y= 5982481.58 X= 258972.67 4= 7805323.23 70(21'09.9934" E= 464073.97 147'57'26.5440' 1935.90 ' 2234.60 27 Y= 5982375.89 X= 259106.18 N= 7805291.69 E= 464115.18 70c21'08.9966" 147 °57'22.5442' 2037.24 2097.77 28 Y= 5982473.39 X 258966.93 ^ M= 7805320.70 E= 464072.27 70°21'09.9111" 147°57'26.7039° 1944.27 2240.07 29 Y 5982367.70 X= 259100.45 Na 7805289.17 E= 464113.47 70 0 21'08.9143' 147 °57'22.7040' 2045.61 2103.24 30 Y 5982465.20 X 258961.20 N= 7105318.10 E= 464070.56 170°21'09.1287' 147° 57' 26.1637' 1952.64 2245.54 31 'Y 5982359.50 X= 259094.71 Na 7805286.65 E= 464111.76 70°21'08.1320° 147°57'22.1639° 2053.90 2101.72 32 Y. 5982457, 01 X. 258955.46 N= 7805315.65 E= 464068.85 70°21'09.7464° 147°57'27.0236° 1961.01 2251.01 33 Y 5982351.31 X= 259088.98 N= 7805284.12 E= 464110.06 70°21'08.7496° . 147 °57'23.0237' 2062.35 2114.19 34 Y 5982448.82 X= 258949.73 N= 7805313.13 E= 464067.15 70 °21'09.6641' 147 °57'27.1834' 1969.38 2256.49 35 Y= 5982318.55 X 259066.03 Na 7805274.02 70 °21'08.4203' Ea 464103.23 147 °57'23.6632' 2095.14 2136.07 36 Y= 5982416.05 X 258926.78 N. 7805303.03 17 °21'09.3347" E= 464060.32 147 °57 2002.07 2270.37 37 Y= 5982310.36 X= 259060.30 N= 7805271.50 E■ 464101.53 70 °21'08.3379' 147 °57'23.8230' 2104.21 2141.55 38 Y 5982407.86 X= 258921.05 N. 7805300.51 E= 464058.61 70 °21'09.2524" 147 °57'27.9127' 2011.24 2283.84 39 Y. 5902302.17 X= 259054.56 N= 7805268.98 E= 464099.82 70°21'08.2556° 147°57'23.9121° 2112.51 2147.02 40 Y= 5982399.67 X= 258915.31 N. 7805297.98 Ea 464056.91 70 °21'09.1700' 147 °57'28.1426' 2019.62 2289.31 41 Y 5982293.97 X= 259048.83 N= 7805266.45 E= 464098.11 70°21'08.1733° 147°57'24.1427° 2120.95 2152.49 42 Y= 5902391.48 Na 7805295.46 X= 258909.58 Ea 464055.20 70 °21'09.0877" 147 °57'28.3024' 2027.99 2294.79 i ��." 7, .�� ....( 44+11/11 � f*f � , B ' ' 5 g... w - # 4 sa 1 M P I PROPOSED WELL LOCATION LIST LOCATED IN SEC. 36, T.I2N., R.16 E. UMIAT M. • PRE PAED FOR SOHIO ALASKA PETROLEUM CO. ,' ;�1l�i f of s + �1 � �► 1 . ' DRW. 140. 116 -85 PREPARED BY F R BELL & ASSOC F.R. ELL . PRUDHOE BAY OFFICE PRUDHOE BAY, ALASKA DATE: NOV.13, 1985 SCALE : N /A SHEET 4 of 10 DRAWN 111' R.G. NECKED 8Y: B. E. REV 0 NELL ASP ZONE 3 UT1 0 , 6 LATITUDE L0► T ■ $IST 4 * MITI 43 Y• 3912223.78 N. 7803263.93 ' 70(.21'01.0,09' 147°37'24.3826 3129.33 2187.96 X= "239043.09 E■ 464096.41 44 Y 5982383.29 N= 7805292.93 70c21'09.0054 147 °37'28.4623 2036.36 2300.26 X= 258903.84 E. 464053.50 _ _ 45 Y= 5982277.59 7805261.40 70=21'08.0086 147c57 2137.70 2163.43 X= 259037.36 E■ 464094.70 46 Y= 5982375.10 N= 7805290.41 70= 21'08.9230" j147 ( .57'28.6221" 2044.73 2305.73 X= 258898.11 E= 464051.79 ' 47 Y= 5982269.40 N= 7805258.88 .70c21'07.9263" 14757'24.6223" 2146.07 2168.91 X= 259031.62 E= 464092.99 48 Y= 5982366.91 M= 7805287.89 70 °21'08.8407" 147 °57'28.7820' 2053.10 2311.20 X= 258892.37 E 464050.08 49 Y= 5982261.21 N= 7805256.35 70 °21'07.8439" 147 °57'24.7822' 2154.44 2174.38 X= 259025.89 E= 464091.29 50 Y 5982358.71 N= 7805285.36 70 °21'08.7584' 147 ° 57'28.9418' 2061.47 2316.67 X 258886.63 E= 464048.38 51 Y= 5982253.02 M= 7805253.83 70 °21'07.7616' 147 °57'24.9420' 2162.81 2179.86 X= 259020.15 E 464089.58 52 Y 5982350.52 N 7805282.84 70°21'08.6760' 147°57'29.1017' 2069.85 2322.14 X= 258880.90 E= 464046.67 53 Y= 5982244.83 N 7805251.31 70 °21'07.6793" 147 °57'25.1019• 2171.19 2185.33 X■ 259014.41 E= 464087.88 54 Y= 5982342.33 Na 7805280.31 70 °21'08.5937' 147°57'29.2615' 2078.22 2327.62 X= 258875.16 E= 464044.96 55 Y= 5982236.64 N= 7805248.78 70°21'07.5969 147 °57'25.2617" 2179.56 2190.80 X 259008.68 E= 464086.17 56 Y= 5982334.14 N= 7805277.79 70 °21'08.5113' 147°57'29.4214' 2086.59 2333.09 X 258869.43 E= 464043.26 37 Y 5982228.44 M= 7805246.26 70 °21'07.5146' 147 °57'25.4216" 2187.93 2196.27 X 259002.94 E= 464084.46 58 Y= 5982325.95 N= 7805275.27 70 °21'08.4290" 147 °57'29.5112' 2094.96 2338.56 X= 258863.69 E■ 464041.55 59 Y 5982220.25 M= 7805243.73 70 °21'07.4323' 147°57'25.5814' 2196.30 2201.74 X• 258997.21 E= 464082.76 60 Y= 5982317.76 N 7805272.74 70°21'08.3467' 147°57'29.7411' 2103.33 2344.03 X= 258857.96 E 464039.85 61 Y= 5982212.06 N= 7805241.21 70 °21'07.3499' 147°57'25.7413" 2204.67 2207.21 X= 258991.47 E= 464081.05 62 Y= 5982309.57. M= 7805270.22 7021'08.2643' 147 °57'29.9009' 2111.71 2349.50 X= 258852.22 E= 464038.14 63 Y= 5982203.87 N= 7805238.69 70 °21'07.2676' 147 °57'25.9011' 2213.05 2212.69 X= 258985.74 E= 464079.34 + �.� N>> � ' MPI PROPOSED WELL LOCATION LIST ,�1E a 4 4 % / LOCATED I N SEC. 36 , T. 1 2 N.. R. 16 E. U M I A T M. r f rtf 4 9 � # • j � PREPARED F0 t / ` J '4 . • v. Gary At, ' No. 691,.3 J � � j � - ' SOHIO ALASKA PETROLEUM CO. ' DRW. NO. 116- 83 PREPARED BY DATE: NOV•13.I1$5 � ,, � OF stooi� SHEET 5 of 10 F. R. BELL A ASSOC. SCALE : N/A Vuinim i' PRUDHOE BAY OFFICE REV. 0 PRUDHOE BAY ALASKA • DRAWN •Y : R.G.T CHECKED SY: I.E. ilEU ASP 201E 3 P. 1E r LATIUM L4. ust OI1T m J iIiT tI 64 Y• 5912301.30 No 7105267.69 70 147°57'20.0601' 2120.04 2354.77 Xs 251146.41 E. 464036.43 65 Y 5982195.68 N■ 7905236.16 70 0 21'07.1852" 147 °57'26.0610' 2221.43 2218.16 • X• 258980.00 E. 464077.64 66 ;Y= 5982293.18 N 7805265.17 70=21'08.0997" 147-57'30.2206" 2128.45 2360.45 X= 258840.75 E =_464034.73 67 Y= 5982187.49 N= 1805233.64 70 147-57'26.2208" 2229.80 2223.63 X= 258974.26 E= 464075.93 68 Y= 5982284.99. N= 7805262.64 70=21'08.0173 "' 147c-57'30.3805" 2136.82 2365.92 X= 258835.01 E= 464033.02 69 Y= 5982179.30 Na 7805231.11 70 1 14757'26.3807" 2238.17 2229.10 ,X■ 258968.33 E= 464074.23 70 Y• 5982276.80. N= 7805260.12 70 0 21'07.9350' 147 0 57'30.5403' 2145.19 2371.39 X= 258829.28 E■ 464031.31 MPI PROPOSED WELL. LOCATION LIST � � ..� �pF q� LOCATED IN SEC. 36T. 12N. R.16 E. UMIAT M. y fi * .. :491t1 PRE PARED FOR l .„„,•i SO H IO A LAS1CA PETROLEUM CO. N. N. r ', � , 5 j• e 111 S , ° f q ••• » �'' " 4. 11�� ORW. NO. 116 -85 PREPARED BY F.R. BELL S ASSOC DATE: NOV.13, 1685 S 6 of 10 SCALE : N/A =�.� _ REV. 0 _ PRUDHOE BAY OFFICE PRUDHOE BAY ALASKA RAwN Y: R T o • .�.. CHECKED 8Y1 B.E• TRUE NORTH GRID S 11° 14' E DEPARTURE TO TARGET: 6056 FT 12527 FT MD 10081 FT TVD BKB ENDICOTT DEVELOPMENT WELL 1- 63/T -22 (MPI) SLOT 1 -63 SURFACE LOCATION X = 258,986 FT ; Y = 5,982,204 FT 2213 FT SNL ; 2213 FT WEL SEC 36 , T12N , R16E RECEIVED JAN 1 r 1939 Alaska 011 & Gas Cons. Commission 11nchorage DEPARTURE TO BHL: 6900 FT 13708 FT MD 10906 FT TVD BKB NOTE: THE NEAREST WELL TO 1- 63/T -22 IS 1- 57/R -23 LOCATED 30 FT NORTHEAST AT SLOT 1 -57. KR V 1 -4 -89 Search Radius= 200 COURSE LINE For proposed well: 1- 63/T -22 [43- 1- 11 -16] Location = W -E S -N TVD(SBS) Top 258986.00 5982204.00 -56.00 Bottom 260093.55 5975393.49 10850.00 Note: All depths in feet Below Kelly Bushing (BKB) WELL IDENT A000- 0000083 MI -33 A000- 0000119 MI -69 A000- 0000120 MI -70 A029- 2064000 MISD10 A029- 2160500 MI -020 A029- 2162500 MI -Q21 A029- 2164800 MI -Q17 A029- 2166900 MI -M25 A029- 2167200 MI -025 A029- 2169300 MI -P20 A029- 2171300 MI -023 A029- 2172200 MI -N22 A029- 2174800 MI -P24 A029- 2175000 MI -S14 A029- 2176700 MI -R12 A029- 2178800 MI -R25 A029- 2182700 MI -P17 A029- 2184100 MI -P21 A029- 2184700 MI -P19 A029- 2185800 MI -S17 A029- 2186400 MI -P26 A029- 2187300 MI -R23 Closest Approach Vertical Intersection /PROPOSED\ /NEARBY\ CLOSEST /PROPOSED\ /NEARBY\ VERTICAL TVD DEPART TVD DEPART DISTANCE TVD DEPART TVD DEPART DISTANCE NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW 1600.6 2104.5 3200.0 2800.7 1900.9 2900.3 2000.8 900.7 500.3 2301.0 400.9 3399.6 1394.2 3100.7 3200.0 3300.0 642.9 0.0 1599.9 0.0 2103.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.7 0.0 0.0 0.0 2.2 0.0 0.9 0.0 - -- Closest Approach Analysis - -- Date: 4- JAN -89 Time: 10:21:02 3200.9 2799.8 1899.9 2899.8 2000.0 900.0 499.8 2300.0 400.0 3399.1 1393.3 3099.7 3199.9 3302.2 641.8 0.0 0.0 18.3 301.5 81.9 23.1 4.4 13.2 15.7 18.4 6.5 1.8 8.4 5.0 0.7 30.0 27.2 11.8 34.8 28.3 15.7 166.9 194.0 131.0 190.5 102.3 218.6 126.2 176.7 196.6 29.6 118.3 61.0 256.2 148.3 98.7 29.4 3600.8 5795.0 35.4 1668.5 2449.9 8387.0 107.8 1726.2 - 1150.0 2592.9 The well which comes closest to the proposed well is: A029- 2162500 MI —Q21 Closest approach distance = 23.1 feet KICK OFF for this run = 3200.0 feet Search Radius= 200 7 DEGREE LEAD LINE For proposed well: 1- 63/T -22 [43- 1- 11 -16] Location = W -E S -N TVD(SBS) Top 258986.00 5982204.00 -56.00 Bottom 260915.29 5975579.23 10850.00 Note: All depths in feet Below Kelly Bushing (BKB) WELL IDENT A000- 0000083 MI -33 A000- 0000119 MI -69 A000- 0000120 MI -70 A029- 2064000 MISD10 A029- 2160500 MI -020 A029- 2162500 MI -Q21 A029- 2164800 MI -Q17 A029- 2166900 MI -M25 A029- 2167200 MI -025 A029- 2169300 MI -P20 A029- 2171300 MI -023 A029- 2172200 MI -N22 A029- 2174800 MI -P24 A029- 2175000 MI -S14 A029- 2176700 MI -R12 A029- 2178800 MI -R25 A029- 2182700 MI -P17 A029- 2184100 MI -P21 A029- 2184700 MI -P19 A029- 2185800 MI -S17 A029- 2186400 MI -P26 A029- 2187300 MI -R23 SUMMARY Closest Approach Vertical Intersection /PROPOSED\ /NEARBY\ CLOSEST /PROPOSED\ /NEARBY\ VERTICAL TVD DEPART TVD DEPART DISTANCE TVD DEPART TVD DEPART DISTANCE NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW 3189.5 1600.6 2104.5 3200.0 2800.7 1900.9 2900.3 2000.8 900.7 500.3 2301.0 400.9 3399.7 1394.2 3100.7 3200.0 3300.0 642.9 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.7 0.0 0.0 0.0 2.2 0.0 0.0 - -- Closest Approach Analysis - -- Date: 4- JAN -89 Time: 10:22:56 3182.0 1599.9 2103.6 3200.9 2799.8 1899.9 2899.8 2000.0 900.0 499.8 2300.0 400.0 3399.1 1393.3 3099.7 3199.9 3302.2 641.8 1243.5 18.3 81.9 4.4 13.2 15.7 18.4 6.5 1.8 8.4 5.0 0.7 30.0 27.2 11.8 34.8 28.3 15.7 0.0 0.0 1390.2 301.5 23.1 166.9 194.0 131.0 190.5 102.3 218.6 126.2 176.7 196.6 28.6 118.3 61.0 256.2 148.5 98.7 29.4 3575.1 31.3 2376.2 102.1 - 1198.0 The well which comes closest to the proposed well is: A029- 2162500 MI —Q21 Closest approach distance = 23.1 feet KICK OFF for this run = 3200.0 feet Mud Weight Interval p 0 -2500 8.8 -9.8 2,500- 9.2 -10.2 11,819 11,819- 9.6 -10.2 13,708 ENDICOTT MUD PROGRAM MAIN PRODUCTION ISLAND WELL 1- 63/T -22 Viscosity (sec /qt), 100 -200 Set 13 -3/8" casing 40 -45 15 -16 Set 9 -5/8" casing 40 -45 Hang 7" Liner Fluid Loss (ml /30min) 20 -15 9.0 -9.5 Mud Type/ pH Components Generic Mud #5 Seawater Fresh water Gel Soda Ash 9.0 -10.5 Generic Mud #7 Seawater Fresh water Gel Caustic Soda Soda Ash Barite Lignosulfonate Drispac Lignite Newdrill 6-8 9.0 -11.0 Generic Mud #7 Seawater Fresh water Gel Caustic Soda Soda Ash Barite Lignosulfonate Drispac Lignite Newdrill kieL DOYON DRILLING, INC. RIG NO. 15 MUD AND SOLIDS CONTROL EQUIPMENT Nominal Equipment Manufacturer Model Capacity Shaker Brandt Dual Double 1000 gpm Desander Demco 2 -12" cones 700 gpm (each) Mudcleaners Tri Flow Double 400 gpm 8 each - 4" (each) cones Centrifuge Pioneer Mark I I , 150 gpm Decanting Degasser Drilco Vacuum 1000 gpm Agitators Brandt 8 each - 25 h.p. Hoppers Geosource Dual Sidewinders 1000 gpm The trip tank and mud tank sections have one vertical pit level float indicator which are connected to the drilling recorder system that contains visual and audio warning devices located in the driller's console. 3T • ASK!, 1K CC P0 6:o vdrannof /7-0 2e =o' e -o e: /G - 0 . Ms% LAC ar5fk 7A J Mu0 VDU/.4C LANK /I - G it • G' ►.LL 2G. E W - A 07 • • v 59 AAA/ Vfw Le vat OAI sr: 6: r -6', D9 =0 IF IN DOUBT ... ASKII r@ -C' 0 C 1. : O ; 13 -5 /8" API -3000# CONTROL LINE WELLHEAD ASSEMBLY,ENOICOTT SKSI 13 -3 / 8"x 9 - 5 /8 "x 4 FIGURE I (3) 9 -5/8" -- CONTROL LINE 4 - /Z" I I . 3. 9 -5/8" CASING AND WELLHEAD EQUIPMENT 3.1 TESTING R.0.P. STACK 1. After 8.0.P.'s are nippled up to split speedhead, make up - 13" x 4 -1/2 Internal Flush R.O.P. test plug, Accessories Item 7, Part No. 538116. 2. Lower plug into head (it will land on lower step). Tighten 4 lockscrews 90 apart. 3. After 8.0.P. test, hack out lockscrews and retrieve test plug. CAUTION: It is very important not to have the lockscrews protruding into the bore of the head while either running or pulling the B.O.P. test plug. Always check them if in doubt. (29) ) n rID - .t� li ..k14 � yS. - ''.:tTI'lw� Ai i . � : •1 i SPLIT SPEEOHEA° TEST PLUG 13-3/8" O.O. CASING • ACCESSORIES LIEN 6 1 131.7 DIA 1. -1r IF FE`. ALP TI-40 1? CAP :K , 210 ACCESSORIES ITE11 / —/— — ) / x 11 it x2.o*m^ ^'1n /FFEMALE THO '� o . | o « o / 8 1 . 11 ' ^ . . _ _" � — _ _ —/ __ ' �'�� E 7 LDwERBJvvL - • , ,�� "- oc-t;~, 7 ^ mu II. 4. 4 -1/2 TUBING AND WELLHEAD EQUIPMENT 4.1 TESTING B.O.P.'s 1. After 9 -5/8" has been set and tested, run in B.O.P. test plug, Accessory Item 6, Part Number 538117, which lands in upper bowl of the split speedhead. Run in 4 lockscrews lightly, 90 apart to keep plug from moving. 2. After test, retract lockscrews and pull plug. 3. Run in short bowl protector, Accessory Item 8, Part Number 538114, using the same running tool, Accessory Item 5, Part Number 538115, that was used for the long protector. 4. After bowl protector is in place, run in 4 lockscrews lightly to hold protector in place. CAUTION: Upper lockscrews must be retracted when the bowl protector or B.O.P. test plug is either run or pulled. PACKING PORT LOCKSCREW CASING HANGER SPLIT SPEEDHEAD �erm.a.o� POOL CLASS STATUS AREA NO. SHORE t20 /6s OGV / o / g70 /c3'7'� OJV CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE (1) Fee "A- (2) Loc PC. I/2E5_ (2 thru 8) �X10e /-/Z-89 (8) (3) Admin / 'jO (9 thru 13) C/ / (10 and 13) (6) Add: eolo RP LCS BEW MTM rev: 01/10/89 6.011 (4) Casg NY /-/z.-89 (5) BOPE _ _- _ _ / (23 thru 28) (14 thru 22) (6) OTHER PC / (29 thru 31) Hz-87 ineering: BEW 2 ',,, RAD ,, Company S4 c 1. Is the permit fee attached 2. Is well to be located in a defined pool 3. Is well located proper distance from property line 4. Is well located proper distance from other wells 5. Is sufficient undedicated acreage available in this pool 6. Is well to be deviated and is wellbore plat included 7. Is operator the only affected party 8. Can permit be approved before fifteen -day wait 9. Does operator have a bond in force 10. Is a conservation order needed 11. Is administrative approval needed 12. Is the lease number appropriate 13. Does the well have a unique name and number 14. Is conductor string provided 15. Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water 16. Is enough cement used to circulate on conductor and surface /AV 17. Will cement tie in surface and intermediate or production strings 18. Will cement cover all known productive horizons 'At ?� 19. Will all casing give adequate safety in collapse, tension and burst 20. Is this well to be kicked off from an existing wellbore 21. Is old wellbore abandonment procedure included on 10 -403 22. Is adequate wellbore separation proposed 23. Is a diverter system required 24. Is the drilling fluid program schematic and list of equipment adequate L 25. Are necessary diagrams and descriptions of diverter and BOPE attached. /At 26. Does BOPE have sufficient pressure rating - Test to 3 o psig /01/4 27. Does the choke manifold comply w /API RP -53 (May 84) 28. Is the presence of H gas probable For exploratory and Stratigraphic wells: 29. Are data presented on potential overpressure zones? 30. Are seismic analysis data presented on shallow gas zones 31. If an offshore loc., are survey results of seabed conditions presented 32. Additional requirements /lkl GEO Lease & Well No. YES NO -Of k qj, oi _b/z //1_.4 Additional Remarks: 7 a2 , GI ' P 21 3 ?ao' / - 63/7:Z.2_ /tier REMARKS koPA 310.o to ;v&-d Vzss/ 'LG Pw J; ► ; /�! 2 .x ,0 CA CO ' .M Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history.file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. D/ T . 026c? c424/1...ww_, 4/as DIRECT IGITAL LOGGING 4 CP s/fr et) 4980 44 0 8 0r e P s - co -go oi $8104 COMPUTER PROCESSED ANALYSIS LLLLLLLLLL LLLLLLLLLL �22�222222 :2222222222 22 22 22 22 . �2 2 2 2 � 22222 22222 22222 11 111 1111 11 11 11 11 11 11 11111i1111 1111111111 444 4444 44 44 44 44 44 44 4444444 444 44444444 444 44 44 44 44 44 SSSSSSSS SSSSS8SS3S .0SS8 SSSSS8SS SS S 8S SSSS8SS8SS SSSSSSSS FFFFFFFFFFFF FFFFFFFFFFFF FF FF FF FFFFFFFF FF FF FF FF FF 2222222222 2222222222 22 22 22 22 �Z2 22 22 2 2�22�2�22 22222�2�2� EEEEEEEEEEEE EEEELL.LLEEE EE EE EE LE,ELL EEEEEEEE EE EE EE EEEEEEEEEEEE EEEEEEEEEEEE DDDDDDDDD DDDDDDDDDD DD vD DD •DD DD DD DD DD DD DD DD DD DD DD DD DD DDDDDDDDDD DDDDDDDDD 444 4444 44 44 44 44 4444444 444 444444444444 44 44 44 44 44 BbEWUULibb6B eeeeeeeeeeee BB BB BB BB BB BB ebbGB6bbbbb BBBBBBBBBBB BB se BB ee ee BB B8BBBBBQ8BBB BBBBBBBBBBB UU UU UU UU UUUUUUUUUUUU UUUUUUUUUU MM MM • M MMM • MM MMMM MM MM MM MM • MMMM MM MM MM M M MM MM MN NM MM MM MM MM MM MM AA AAAA AA AA AA AA AA AA AA AA AAAAAAAAAAA A AAAAAAAAA AA A AA AA •AA AA AA AA 8888888080 888888808888 88 88 �8 88 88 8 88888888 88888888 88 8 88 8 88 88 888888888888 8888888888 PPPPPPPPPPf PPPPPPPPPPf PP PP PP { • PPPPP9PP/ • PPPPPPPP{ PP PP PP PP PP MM MMM M MMMM MM MM MM MM MM MMMM MM MM • MM MM MM MM MM MM 99999999 9999999999 99 99 9999999999 9999999999 9 9999999999 999999999 ********m************* *** REEL HEADER **** ********************** Service name: &n5F01 Previous reel: Comments: *********************w *** TAPE HEADER • **** ********************** Service namel &G5F81 Previous tape/ Comments; •********************** *** FILE HEADER **** .********************** File name: Date� 89/02/24 Origin: Date: 89/02/24 Origin: .001 Service name: ---- ---~-- HEADER RE:ORDS Maximum Iength: 1024 File type/ LO Previous file/ Reel name: Tape name: Version #: Date/ 135025 Continuation #: 01 135025 Continuation #: 01 P aoe 1 _ 1[ NFORMAT ON RECORDS MNEM CONTENTS UNIT TYPE C . EXPLORATION . . . . .. . . .. .. .. . WN 1-763/T-22 MPI API NIM; 50-029-21905. . . . . . . . . . .. .. . FN ENDICOTT DATE LOQQED; 02-21-89. . . . , . . . . . .. .. . CCUN NORTH SLOPE .. . . . . .. .. .. .. .. .. .. . . . . .. .. . . .. .. . STAT ALASKA 22 . . . . .. .. .. . . . . ,. . . .. . ' . . . . . . ' ' '. 42 CTRY . . . . . . k. .. . . . . . . . ^ . . . . . . . . ^ ` . . ' . 44 14 AP IN 21905. 000 . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . ' ' . . . . LATI 0 De. 0 Mi n. U. 0 Sec. N 2224 .. . . . . . . . . . . 44 .. .. . . LONG 0 Deg. 0 Min 0. 0 Sc e. W . . .. . . . . . . . . . . . . . . .. .. SECT ,f 88 . . .. .. . . . . . . . . .. .. . , .. .. . . . . .. .. . . . . . . . . 44 4814 .. . TQ WN 1 2N . ..,.............^.....,..'^''.^..'^.....'..'..'',''' RANG 16E . . . . . . . . .. . . . . . . .. .. . . ^ . .. .. . . .. .. . . . . . . . . . . . . .. ' . . . EKB 55. 250 . . .. .. .. .. ,. .. .^ ., .. It .. .. .. .. ., .. ,. . . .. .. .. .. .. . . FT F . 00O 4 . . . . . . . . . . . . . . 48 . . . . . . . . . . . . . . . . . . , . . . . . . . 48 41 . . . . FT GL 4.50u . . . . . . .. . . . . . . . . .. . . .. .. .. IS . . .. .. . . . . . . 42 . . .. .. . . FT PD MS . . . . . . . ' 0144 ' . . . . ' . . . ' . . . . ,' ' . ., ' . 22 33 23 . . ' . 22 23 .. .. . . F B. . . . . . . . ' . . . . . , . . . . ' . . . . . . .. . . . . .. 22 at at ,4 . . . . . . . . ' ^ . ^ DMF KB .. .. . . .. .. .. . . .. . . . . .. . . .. .. . . . . .. Al .. .. . . .. . . .. .. . . . RUN ' '. .. ^ . ^. .. '' .^ 22 '. .' .^ ' . '. .. '. .. .' '. .' . . . . ' . .. . . .. '' . . TIME 1 8 1 3 . O 0 0 . . .. .. .. .. . . .. .. 42 .. . . .. .. .. .. .. . . . ' . ' .^ .. .. is . . DATE 21/ 2/89. . . . . . . . . . . . . . . . . . .. .. . . . . .. . . . . . . . . . . . . .. .. . . . . LCC . . . , .. .. . . . . . . . . . . . . . . . . . . . . 32 .. . . . . . . . . . . 32 . . . . . . . . SON 1 7 502 5 .. .. .. . . . . . . .. . . . . .. Sr .. .. ^. .. .. . . ' . . . ' ' .' . . . . LUN 7611 .. .. .. . . . . .. .. . . .. .. .. .. .. .. .. . . . . . . . . .. .. .. FL O T SLOPE .. . . . . . . .. .. . . . . . . . . . . . . . . . . , . .. .. . LUL NORT SLOPE . . .. , . .. 4388 .. .. . . . . . . . . . ' . . . ' '. '. . ENGI PRESSLEY SR .. . . 4148 .. .. .. .. . . . . . . . , . . . . .. .. Ts WITM ZARNDT . .. . . ., .. .. .. .. .. .. . . . . . . . . . . .. .. . . DD 13196.0O0. . . .. 32 . . . . . ' . . . . .' '. . ' .. '. 22 '' . ' ' ' fa . . . . . . ' ' . . FT DL 0.000 FT CBD1 1 1 7 9 0 . 0 0 0 . . . . . . . . . . . . . . . . . . . . . . . . . ' . . . . . . . . . . . . . ' . . . ' . . FT CBL1 11790.O0 . . . . . . . . . 37 . . . . . . Si . . . . . . . . ' . ' . . . . . . . . . . . . ' . . . FT TLI 11 358.000. .. . . . . . . . . . . 22 22 3; . . . . . . . . . . . . . . . . . . ' . . . .. . . ' FT BL I 1304 000. � '' ' ' ' ' 2/ 42 '' '' ' ` '' ' ' ' '' '' ' ' '' ' ' ' ' ' ' ' ' '' '' '' ' ' FT TC 10.3 . . . HR T B 22 000. . .. ,. 3343 3142 .. .. ' . .. 2142 .. .. .. ' . . . . . .. . . . . .. .. . ' HR BHT 19 .000. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DEGF MRT 196 ,000 . . . .. . . . . . . 04 . . .. . . . . .. .. .. .. Si 24 24 . . . . . . 22 02 . . . . DEGF MT • LIQNOSULF. 13 . . . . . ' .' ' ' ' . .. . ' ' . . . . . ' . . . ' . . . . ' . . MSS CIRCULATED .. 24 :3 . . .. .' .. . . ' . . . . . . . . . . . . . .. .' ' . DFD 9.80 . . . . . 44 . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . 22 . . . . . . . . . . . . LB/G MYIS 37 .0OU. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ,. . . . . . . . . . . . . . . . CP DFPH I0.500. 4233 .. .. .. .. .. .. . . .. . . .. .. .. .. .. .. .. .. .. .. .. .' DFL . 9 0 0 . . . . . . . . . . . . . . . . . . . . . .' .. .. ' . .' ^ . . . . . . . . . . . . . .. . . . ' RM • .360. . . . . . . . . . . . . /3 32 . . . . . . .. .. .. .. . . . . . . OH MM RMF 9 2 0 . . . . .. .. . . . . . . . . 22 72 22 .. 3412 . . .. .. . . . . . . . . .. .. .. .. . OHMM MFST 68. U00. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DEGF MFSS MEAS. . . . . ' . . . . . . . . . . . .. .. .' 7 ^ . .' . . . . . . . . ' . if .' it RMC 1 .470. . . .. . 3132223 . . . . . . . . . . . . 222312 2222122312 . . .. .. .. . . OHMM CATG SIZE CODE ERROR 0 0 40 65 0 0 40 A5 0 0 0 0 20 0 0 0 2 0 0 4 68 0 0 34 65 0 0 34 0 3 4 68 0 3 4 68 0 3 4 68 0 3 2 65 0 0 10 65 0 0 10 65 0 0 20 65 0 0 20 69 0 0 20 65 0 0 20 65 4 68 0 3 4 68 0 4 4 68 0 1 4 68 0 2 20 0 2 20 4 68 0 2 4 6 0 2 4 6 0 2 4 68 0 4 68 0 2 4 68 0 2 4 A8 0 2 12 65 0 2 4 6O p 2 CONTENTS �[ �������������� l� ���� �������������� � U�� ��0'O� U � �8� ���������� UNIT TYPE CA TG i �� �.080. . . . .. .. . . .. .. .. . . . . /414 /API .. .. . . . . . . . . . . .. .. . ^ DEGF 0 4 ME AS .. . . . . . . .. .. . . .. . . . . . . . . . . . . 44 . . . . . 0 1 9 .625. . . .. .. .. . . . . .. .. .. . . . .. .. .. .. .. .. . ^ .. .. . . .. .. . . . 0 3 4 68 8 .500. . . . . .. .. . . . . .. .. . . . . . . . 1111144 . . . . . . . . . . . . .. it 41 0 3 4 68 Page 3 CODE ERROR Well Well Well Well Well Well Well Well MMENT RECORDS Location Comment 1: SURFACE: 2213' FNL & 2213' FEL Location Comment 21 Location Comment 3: BP EXPLORATION 1-63/T-22 MPI Location Comment • 4; File Comment 1/ DLL/MSFL TOOL STUCK AT 12689' File Comment File Comment File Comment 2� 3: 4: CLOSED CALIPER/POWER LOCKOUT ON LATEROLOG FROM 12614' - 12672'. GLD/CNS TOOL PULLED TIGHT AT 12816', CLOSED CALIPER TO GET FREE, REOPENED CALIPER AT 12788'. DID NOT LOG T.D. AT CUSTOMER REQUEST. ******************************************************************************** **************************************w*w*************************************** * LIS tape written by: ANCHORAGE COMPUTING CENTER ** All curve and tool mnemonics used are those which most closely match ** :4; :f. Gearhart curve and tool mnemonics. ******************************************************************************** ******************************************************************************** GEARHART MNEM SERVICE UNIT DEPTH TEN DLLMSF SP DLLMSF GR DLLMSF CALI DLLMSF LLD DLLMSF LLS DLLMSF MSFL DLLMSF TEN1 SLDCNS GRI SLDCNS FT LBS MV API IN OHMM OHMM OHMM LBS API TO SCHLUM8ERGER MNEM SERVICE UNIT DEPTH DEPT FT TEN DLLMSF LBS SP DLLMSF MV GR DLLMSF API CALI DLLMSF IN LLD DLLMSF OHMM LLS DLLMSF OHMM MSFL DLLMSF OHMM TEN SLDCNS LBS GR SLDCNS API TOP 11344.00 11785.50 11785.50 11785,50 11785.50 11785.50 11785.50 11785.50 11785.50 11785.50 BOTTOM DEPTH 13865.00 13065.00 13065.00 13065.00 13065.00 17.065.00 13065.O0 13O65.O0 17 13065.00 * * ** Page CALI1 SLDCNS IN RHOB1 SLDC G/C3 QRHO1 SLDCNS G/C3 FCNL1 SLDCNS CPS NCNL1 SLDCNS CPS LSDP1 SLDCNS CHAN CUPE1 GLDCNS CPS SSDPt SLDCNS CH QUAL1 SLDCNS ---' FSLD1 .SLDCNS CPS NSLD1 SLDCNS CpS LPCT1 SLDCHS CPS LCCT1 SLDCN!:3 CPS SCCTY SLDCNS CPS PEF1 SLDCNS 8/2L NPSSt SLDCNS SSPU DPHI1 SLDCNS ~ PU RAT1 SLDCNS CPS CALI RHOB DRHO FCNL NCNL LSDP CUPE SSDP QUAL FSLD NGLD LPCT L CC T SCCT PEF NPSS DPHI RAT SLDCNS SLDCHS SLDCNS SLDCNS SLDCNS .SLDCNG SLDCN8 GLDCNG SLDCNS SLDCNS SLDCHS SLDCNS SLDCNS SLDCNS SLDCNS SLDCNS SLDCNS SLDCNG IN 13/C3 G/C3 CPS CPS CHAN CPS CHAN CPS CPS CPS CPS CPS B/EL SSPU PU CPS 11785.50 11785,50 11785,50 11785.50 11785.50 11785.50 11785.50 11785.50 11785.50 11785,50 11785.50 11785.50 11785.50 11785.50 11785.50 11785.50 11785.50 11785.50 13065.00 13065.88 13065.00 13065 .00 13065.00 13065.00 13065.00 13065.00 13065.0U 13065.U8 13065,00 13065.00 13065 00 13065,00 13065.00 }3065.O0 13065.00 13065.0O `*********************** '*** ENTRY BLOCKS. **** '*********************** ENTRY 1 . . , ' . . . . . . . . ^ . . . . , ' .. . . is ' , , . . . . . U FO; Ft , . .. . . .. .. .. .. .. .. .^ .. .. tit/ ******* '*** ENTRY BLOCK LEGEND **** `***************************** TYPE DESCRIPTION 16 Datum specification block sub-type 0 Terminator ( no more entries ) DATA FORMHT RPECIFICATION' TYPE SIZE CODE 16 0 66 66 * ** :iAT€ iM •:3PEC F ICA •:ION BLOCKS * * ** SERVICE S . RV I C E API A P I API •AHEM ID ORDER UNIT LOG iG TYPE CLASS DEPT _ 1 35 04� 5 FT 0 tt 0 0 1 4 0 1 68 TEN L,., L". L.. r =1: Lw 1 3 5 0 2 Lr B. 94 675 0 i 0 4 € i 1 68 SP DLLMSF 135025 MV 94 1 u 1 1 € 4 tt 1 68 GF [ T••.. ". ''1:w E 1 025 € -` I 94 310 i 1 0 4 0 1 68 C L I L . a L — L _ r 1 : . � $ = 175025 I N 94 28.0 2 1 0 4 €0 1 68 LLD DLL..M F 1350st5 t_tH.LeiM 94 ::.tI 10 1 0 4 0 1 68 L ._S L'3._LiI3! ~' 135025 OHrIti 94 220 9 1 0 4 0 1 6 MS isLLr SE i .35 0 .5 OHNP1 94. 270 4 1 0 4 0 1 68 TEN SL.U3.w•N.,r 135_025 LBE 4 5 11 1 3� 4 0 1 68 €3 ; LL 3Y H: 1 35, E + 0 °, API 94 310 1 1 0 4 0 1 68 CALI SLDCNS 1 i ;3 :"".f •I` ':.'�4 280 2 1 18 4 0 1 68 pi:iy••..'oP_: •1 c H } 3 1 35 ii2 .,� 4 G:�'tM .:� `• 35 0 1 1 €1 4 U 1 6 L PH3m€ 5LDCF93. 175025 G/ f.3 94 756 1 1 t.3 4 Lt 1 68 FCNL SLD3M HS 135 CPS 94 334 31 1 0 4 0 1 68 NC t L 'E_LD €_: j H: 135025 CPS j 4 334 30 1 t t~r 4 0 1 68 LS DP i^LuC1`FS 135.025 CH €••3N 4 0 61 1 0 4 0 1 68 CU PE '. L E CI4S 135025 1.:P 4 0 0 1 0 4 0 1 68 33DP SLEJC.WS 1 3wF025 CH3~AN 94 0 0 1 0 4 0 1 68 t U -1L :L.DcHC 135025 ---- 94 u 0 1 0 4 0 1 68 F :LD '-: ,• :yC,Hc 1" CPS 94 0 .t 1 0 4 t€ 1 68 NSLD sL' 3F:NS 1 35u :` CPS 94 0 0 1 #t 4 • £t 1 68 LL-•'C 1 SLt^.at=:ytic S N _ 175025 CPE 94 t 0 ti 1 0 4 i3 1 68 L L• C T ��t L # C f 'f 135.025 a { i 1. 4 0 0 ' 0 4 0 1 68 SCOT SLDCNS 135025 (PS 94 0 0 1 ti 4 0 1 6.8 PEi- SLDONS 175025 F aL 94 0 0 1 0 4 0 1 68 NP.: NPSS S i....D3M•i s 1 3:" •.J 0 Iw �5 '•' •r� �� Pt 94 8° 0 3 1 0 4 l€ 1 68 J D .r? I 4 €_.DC,t4S 135:025 94 890 1::' 1 0 4 0 1 6 RAT L_L.'L l'I 135025 C P :, 94 420 1 1 0 4 0 1 68 D ATA FORMAT SPECIFICATIONS API FILE PRC MOD # SIZE L.YL SMPL RC PROCESS INDICATORS 00E €000 00000 000000€ 000000 :000000 000000 000000 000000 000000 0013E €1313 133. €01300 €, €00000 00113 000 00) 0088j 0€j0 €I€06€ 000000 0€ 0 0! i €0 '0 000000 000000 .000000 000000 000000 000000 €000000 000000 0000130 0000.€0 000000 0 0 0 0 0 0t 000000 000000 0013000 000000 000000 0 0 0 000 000000 000000 0000E30 001 €000 - 000000 003,3000 000 €000 00€0000 000 €00 000000 00E €0E30 000000 000000 000000 000000 00E30E30 00 €0000 000000 000000 000000 000000 0 E3 E 3 00 €0 0 000000 000000 00.30E €0 000000 000000 000000 000000 0 0 f€ 0 0 0 000000 00001 €0 00 €00011 0013000 000000 000000 000000 000080 000000 000000 0000130 000000 000000 000000 0 0 0 0 0 0 000000 000000 0 0 0 0 1 1 0 000000 Page 6 DEPT TEN P GR CALI TEN CALI RHOS DR HO FCNL NCNL LSDP CUPE :SSDP QUAL - SLD NSLD LPCT LCCT SCCT PEP' NPSS DPHI RAT 13065,000 2576,000 0.008 0.008 DATA _REC RDS -999 .2 -999.250 -999. -999,250 -99 .� -999.250 -99 . 5 .0 0 0 O. 0 00 1. 956 0.000 0.000 0.000 111.350 110.7�0 1.058 1.880 1,000 0.000 0.000 0.000 0.000 41.885 -999.250 13000-000 5146,000 25,20.0 67,700 8.030 48.641 41.115 27.040 5114,000 69,700 8,880 2,50:". .021 171.10O 302.588 110. 1.04/ 11U.090 1.090 8128.301 17701.086 1109.000 2097.000 13164.000 2.110 26.840 8.632 1,957 12900 .•000 5196.000 68,800 79,3.00 8,570 20,045 . . 5216,000 83,5..00 9,710 2,344 ,.082 83.300 203.300 109.360 .80::: 109.970 1.06U 6441.687 18879.906 842.000 1742.000 14292.000 2.680 .2 5.910 18.298 ,e.806 . 1280 0 , 0 00 5594,000 75,000 98.9 9,1 11,324 10,495 17,865 0.00 0.0 O. 0 O0 U.0 Ct 8 0,000 0.000 U.000 0.000 0.000 O.000 0.008 1.0 0ft 1.8U0 0.0O8 0.000 0,000 0.000 3.188 160.798 0.000 12700.000 5072.()00 A0,500 50.700 8.870 16.78P 18,323 . : 19.231 50746,U00 52.700 9,220 2,501 .024 210.800 340.000 109.090 . 957 1O9.190 1.090 7998.347 18923.422 1043.008 2249.000 14325.008 2,300 19.088 8,754 1.589 12600,000 4932.000 63, 7 0 . 60O 8. 0 46,881 55,081 . 3 4987.0 00 47 , '900 8,880 .29 .U2 400.000 480.008 109.088 1.708 109.160 1.860 11534.520 19498.438 1932.000 3340.000 14890.000 2. 260 18.733 21.277 1.451 12500.800 4916,000 47,500 24,300 8,170 87,498 90.573 17.8 5036,000 25.400 8.510 2.2 .012 243.300 374.100 109.000 i.495 109.290 1.100 18046.150 18535.301 1546.000 295i.000 13916.000 2.180 21.790 24.255 1.641 12400.000 4957,000 75,7;00 40.400 8,0A0 86,099 .9 63.973 4909.000 58.600 8.350 2.463 .875 215.800 345.500 108.72O .669 109.220 1.050 6776.414 19142.543 625.008 1987.000 14521.000 2.950 23.110 11.064 1,719 Page 7 DATA RECORDS DEPT TEN SP GR CALI TEN GR CALI RHO@ DRHO FCNL NCNL LSDP CUPE SSDP QUAL FSLD NSLD LPCT LCCT 8CCT PEP NPSS DPHI RAT 12300.080 5085.000 80.400 114.1 00 720 514R.000 127.100 9,980 2,649 .073 .699 189.130 1.090 5623.409 17258.355 2.680 24.490 -.243 1.859 15,740 14.825 . 1 /91.600 312.200 108.750 704.000 1611.000 12881.000 122O8.0 0 1 4999,000 86.500 81,900 10.1 . 12.274 5270.0O0 83.300 10.550 2.6 93 .037 122.500 256.600 .468 109.070 1.000 4886.521 16595.840 440.000 1356.000 3.480 29.870 -2,918 2,159 12100. 5212,000 98.100 66,4 9,990 29,648 5299. 6 2 . 2 0 0 18. 640 2,65 .0O2 2O4.400 .482 108.970 1.060 4591.976 15667.504 479.000 3.930 16.495 -.3U4 1.551 12080.0 4940,000 90. 87,8:00 14,710 5.093 ' 6763.O00 91,000 14,680 . .329 93.300 208.00.0 1.135 109.150 .950 10256.516 2466O.7.2O 1161.000 3243.000 3.920 36.980 7,964 2.610 11900. 5.053,000 83,300 50,44:10 10.3 0 14.388 11.912 497T.000 43,900 10,920 2;681 .007 250.800 400.800 .531 108.698 1.070 4886.521 15205.494 538.008 1311.000 2.920 19.296 -2.188 1.568 11800.000 4799.000 90.400 69.600 14.820 .617 7,211 5260'00 78,300 15,010 2,591 .052 157.700 292.500 .620 108.800 1.080 5610.479 17i00.129 635.U00 1605.000 3 .O30 25.810 3.483 2.105 11,376 108,470 1;23i9.O08 32.810 ' 317.700 108.260 11 88.0O0 11548.008 2,328 108.490 19111.000 14,289 108,210 11312,000 3.899 188.160 |2745.00U '*********************** '*** FILE TRAILER **** '*********************** File name: &Q5F81.081 Maximum length: File name: Maximum length: ____ 102 '********************** '*** FILE HEADER **** '********************** .002 ce name/ TRAILER R File type; LO Next file: Service name; 1024 File type: LO Previous file: ELORDS Version #/ Version #: Date/ Date: 7� tiFn Rtel ���� = 11 RECORDs MN EM CONTENTS UNIT TYPE CATG SIZE CODE ERROR CN B.p. EXPLORATION WN 1-63/T-22 MPI API HIM 5O-O29-21905. . . . . . .. . . .. .. . FN NDICOTT DATE LOGGED: 82-21-89. . . . . . . . . . .. .. . ^ COHN IA O TH SLOPE .. .. et . . . . . . .. .' ' . . . ' ' . . . . ' . '. .' .. 23 STAT ALASKA 12 . . . . It '. . ' II .. se ' ' ' . . ' as at a; '' at '' CTRY USA as la . . It la . . . . . . .. ' . . . ^ . ' . . . . ' It .' . ' APIN 219O5.000. .. ,. . . . . . . ,. .. . . .. .. .. .. .. .. .. ' . . . '' . . . . .. . . . . LATI 0 Q 0 Man. 8. 0 Sec. N . . .. . . . . . . . . .. .. .. .. .. . . LONG O Deg. 0 Min. 0, 0 Sec. W 44 .. . . . . . . . . . . .. . . .. .. . . SECT . . . . . at . . ^ . ^ . . . .. . . . . . . . . . . .. ' . . . . . ' . . , ^ . . . . . It 20 . ' 22 TOWN 12N---; . .. .. . ' tit, ^^ ' . .. .. .' .^ '. '. . . ma . . '' .. .. It ' . .' RANG 16E—, . .. it it . . . . la . . , . . . , . . . . . '. 44 . . , ' . . . ' . . . ^ it '' .' . . EKB 55,250.--„,,,,...— . . ,. .. . .. .. .. . . . . . ^ .. . . . ' '. . . . ' FT EDF 0, 0001 11 4141111112 ................ ....,............^ FT EGL 14,50.0 . . It . , . . ^. . ^ . . *2 . , . . .. .. . . . . .. .. . . . . . . . . . . 22 22 .. . FT PD MS 24 . . . . . . . . . . . . . . ft It .. . . . . .. ., IS .. 42 .. . . . . . . . . . . .. .. . , F B. . . . . . . . it . . . . . . . . .. . ' . . ', . . .. IS ., . ^ . . . . . . . . . . 2.4 .. . . . ' F KB. . . . . . .. .. .. . . . . ' . ." . . t2 .. at Vita ft '' ^ . . . . ' . . . ' . ' '' ' ' . . RUN 1. . . . . At .. 3322 Pt .. .. .. ' ' ^^ .' .. .' '. ', . . ^ . . ' ^ . '. . . '. art* TIME 1813.U00..........,......... DATE 1/ 2/89 , .. .. .. .. . . . . . . . . .. .' .. .. .. . . . . . . . . ' . . . . ' .^ . . . Lee ' . . ' . '. . . .. . . . . , . . . . . ^. . . ' ' ' ' . . ' . . . . ' . . . . . . . . . .. ' ^ ~^ 135025 ' ' '' '' '' ' ' ' ' ' ' ' ' ' ' '' ' ' ' ' '' '' '' •'' ' ' ' ' ' ' ' ' '' '' ^ ' ' ' ^-~' ' ' ^ ' ' '' it '' '' ^ ' ' ' '' ^' ^' '' '' '' ' ' ' ' ' ' ' ' ' ' ^ ' '' '' la FL NUR 1 8L PE LUL HORT SLOPE . . . ' . ' . . ' ' . . ' . . . ' . ' . ' ' .' ' . ' . . ' . ' . ' . ' ENGI PRESSLEY .. .. . . .. .. .. '' '' '' '. '' ^ ' .' '' '' '' '' '' WITH ZARNDT It . . . ' .. at at . . .. 21 .. . ^ . . . . . . . . .. . ' . . DD 1 3 1 1000. . . .. . . . . . . is r: . . .. .■ . . " . ^ . . . '. .^ . . '. . . . . .. '. . ' FT DL 0 , 000, 421224111414 . . . . . . . . ft . . . ' ' . . . ' . . . . . . . . ' . . . . . . FT CBDI 1 1 7 . 00.0 . . . . . . . . . . . . . . . . . .. . . . . . . . . . . It . . . . . . . . . . . ' . . . ' FT CBL1 11790-000, . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • . . . . . . . . . " . . la FT TL 11350. 000 FT EIL I 130 4.800. . . 47 .. .. . . 7144 . . . . .. .. .. .. .. .. . . . . . . . 324 2324 2I FT TCG 0 . 3 0 0 . . . . . . . . . . . . . . . . . . . . . , . , . . . . . . . . . . . . . . , . . . . . . . , . . . HP TLAB 22.000 HP BHT 196.000 . . . . . . . . . . . al It . . . . . . . . lb . . . . . . . . . . . . . . . . . . . . . . . DEGF MR 196 .000. . . . . . . . . . . . . . . 24 . . . . . . 22 . . . . . . . . . . . . . . 42 . . . . . . al DEQF MT L IQNOSULF. . . .. . . . . . . . .. .. .. . ^ . . . . . . . . . . '' 22 . . MSS CIRCULATED .. . . . . . . .. ' . ' . . . ' . . . . ' . . . . ' . '. .. ' . ' . DFD 8 U 0 . . . . . . . . . . . . . . . .. . . . . . . .. .. . . .. .. . . . . 42 .. . . . . .. . . . . LB/G MYIS 4 4 4 4 4 1 1 1 4 1 1 1 1 1 4 4 4 1 a 41 13 . . . CP DFPH 1 0,500 at .. .. .. .. .. . . .. .. . . . . .. is 41 .. .. '. ' . .' ' . ' ' '' '' .' '' DEL 5 .900,--- . . . . . . . . .. 24 ' . . ^ .. . . .. .. . . ' . . ' . ' ' ' ' ' . ' '' ' ' ' ' RM 1 .3 0 . .. .. .. .. . . . . . . .. . . . . .. .. . . .. . . .. . . . . . . . . .. .. .. .. . . OHMM RME .92U. . . . .. .. .. . . .. . . .. .. .. .. .. .. .. .. .. .. . OHMM MFST 68.000., .. .. . . .. . . . . . . .. .. .. to .. . . .. .. . . . . . . 44 . . .. .. .. DEGF MESS MEAS. . . . . . . .. .. . . .. . . . ' ' . .' .. ' . .. . . . ' . ' . . . ' .' '' ' ' RMC . 4 7 0 . . . . . .. . . .. . . . . .. .. . . . . .. .. St :3 .. .. . . . . . . .. . . 2114 24 OHMM 22 '' '' '' '' '' '' ^' 0 0 40 65 0 0 40 65 0 0 40 65 0 0 20 0 0 2 0 0 20 0 0 4 bti 0 0 34 65 0 0 34 65 0 0 2 65 0 0 3 65 0 0 8 65 0 0 10 A5 0 0 20 A5 0 0 20 65 0 0 20 65 0 0 20 A5 0 3 4 68 0 3 4 68 0 3 4 8 0 3 4 68 0 3 4 68 0 2 4 68 4 4 6 0 1 4 68 0 1 4 68 0 2 20 65 0 2 2O 65 0 2 4 68 0 2 4 68 0 2 4 68 0 2 4 68 0 2 4 0 2 4 68 0 2 4 68 0 2 12 65 0 2 4 68 Page 10 MEM CONTENTS MCST .68 , 0 . 73a MCSS MEAS CS - 9625 „ t•tt10 , BS 8,500, aCia ta INFORMATION RECORDS V01011;010700110 004ittl$00114$ 41170110000 010t101004*400404140144 at C440 aillIatal Aa talts1.77070tti0 lAtillittt0,00.0t40■11%00 t0100010.031 tx re to .404 al 0304 ta al Pr 4 Page 11 UNIT TYPE CATG SIZE CODE ERROR DECF 0 2 ,... 4 68 0 4 12 65 • • t■ 0 3 4 68 Ir a 0 '7 ,,..,, 4 68 Well Location Comment 1 SURFACE: 2213' FHL & 2213 FEL Well Loc.Rtion Comment 2; Well Location Comment 3: BP EXPLORATION 1 -1;3/'-22 MPI Well Location Comment 4 Well File Comment 1 DLL/MSFL TOOL STUCK AT 12689'. CLOSED CALIPER/POWER LOCKOUT Well File Comment 2 OH LATEROLOG FROM 12614' - 12672'. SLD/CHS TOOL PULLED TIGHT Well File Comment 3 AT 12816', CLOSED CALIPER TO GET FREE, REOPENED CALIPER AT Well File Comment 4 12788', DID NOT LOG T,D. AT CUSTOMER REQUEST, ******************************************************************************** ******************************************************************************** ** LIS tape written by: ANCHORAGE COMPUTING CENTER ** All curve and tool mnemonics used are those which most closely match 4:4: Gearhart curve and tool mnemonics. ******************************************************************************** ******************************************************************************* GEARHART ;1NEM SERVICE UNIT DEPTH TEN2 DLLMSF CHLI2 DLLMSF SP2 DLLMSF LLD2 DLLMSF LLS2 DLLMSF MSFL2 DLLMSF GR2 DLLMSF TEN3 SLDCNS GR3 SLDCHS FT LBS IN MV OHMM OHMM OHMM API LBS API ultIMENT RECORDS TO SCHLUMBERGER TOP BOTTOM MHEM SERVICE UNIT DEPTH DEPTH DEPT TEN CALI SP LLD LLS MSFL GR TEN GR DLLMSF DLLMSF DLLMSF DLLMSF DLLMSF DLLMSF DLLMSF SLDCNS 3 LDCNS FT LBS IN MV OHMM OHMM OHMM API Les API 11344.00 12259 00 12259 00 12259. 00 12259 00 12259 00 12259 . 00 12'. 12259,00 12259 . 00 13065.00 12482.00 12482.00 12482.00 12482.00 12482,00 12482.00 12482.00 12482.00 12482.00 :44:44 * * Page 12 CAL 3 SLDCHS IN RHOB3 SLDCNS Q/C3 DRHO3 SLDCHS G/C3 FCNL3 SLDCNS CPS NCNL3 SLDCNS CPS LSDP3 9LDC1-4S "CHAN CUPE3 SLDCHS CPS SSDP3 SLDCNS CHAN QUAL3 SLDCHS FSLD3 SLDCNS CPS NSLD3 SLDCNS CPS LPCT3 SLDCNS CPS LCCT3 SLDCNS CPS SCCT3 SLDCNS CPS PEF3 SLDCNS B/EL NP3S3 SLDCNS SSPU •PHI3 SLDCHS PU RAT3 SLDCNS CPS CALI RHOB DRHO FCNL NCNL LSDP CUPE GSDP .C4 UAL FSLD NSLD LPCT L CC T SCCT PEF NPGS DPHI RAT SLDCNS GLDCNS SLDCNS SLDCNG SLDCNS SLDCNS SLDCNS SLDCNS SLDCNS 3LDCNS SLDCNS SLDCNS SLDCN3 SLDCNS SLDCNS SLDCNS SLDCNS SLDCNS IN Q/C3 G/C3 CPS CPS CHAN CPS CHAN CP s CPS CPS CPS CPS B/EL SSPU PU CPS 12259,00 12259,00 12259.00 12259,00 12259.00 12259.00 12259.00 12259.00 122S9.08 12259.00 12259.00 12259,00 12259,00 12259,00 12259.00 12259.00 12259.00 12259,00 12482.00 12482.00 12482,00 12482.8O 12482.00 12482.00 12482.00 12482,00 12482,00 12482.00 12482.00 12482,00 12482.00 12482,00 12482.80 12482.00 12482.00 12482.00 .*********************** :*** ENTRY 8L8CKS ***m '*********************** ENTRY TYPE SIZE CODE ----- --~- ---- ---- 1 . .. . . . . .. .. .. .. .. ,. 0................".' .***************************** *** ENTRY BLOCK LEGEND **** .************************+**** TYPE DESCRIPTION 16 Datum specification block sub-type 0 Terminator ( no more entries ) ������ FORMAT ��� � �� � ���� � ���� ���� U � � ����'U�� 8 �� ��� � � � ��� � ���U�� ~' '' "" 11 . . . .. ,, .. . . 16 1 66 0 1 66 DEPT TEN C: A L I SP LLD LL :3 iSF L LR TEN 1 CALI R H O B DRH1 'CNL t4C t4 L LtiDP CUPE 990 P Q Ui A L Fey L0 1 9 L0 LPCT LCCT S t :1_: T N P 3 0PH I RAT DL.LM3E 0LLM3E 0LLM9F 0LLM9F 0 L L 11 9 E 0 L L M 9 F DLLM3F 1 � p ... 0 C H :3 DCNS ::;LbCN9 SLDCNS 3LDCH SLDCt4 9LDC 1 SL0p r 1� 1 4:_S SLDCHS SL DONS 1 143 : LDC 149 9LDC143 SL j D ry C 1 :3 3 L 0 1.: 14 5 3 L D C N SL D C �i 1 '= w � 'SLDFw P4S LDCH3 :3LDC14 135025 135025 135025 135025 135025 135025 135025 135025 135025 135025 135025 135 025 135025 135025 13 025 135025 135025 135025 135025 135025 135025 135025 135025 135025 135025 135025 135025 135025 DATA FO *****-*****************+.************* * ** DATUM SPECIFICATION FLOCK; **** : +:* * * * * * * * *f **,F ds**** * * * ** *:}:* *:gyp **::+: :4: * * *** SERVICE SERVICE AP I API API API F I L E MNEII I D ORDER * UNIT LOG TYPE CLASS MOD FT 0 00 0 0 LBS 94 635 0 3 IN 94 280 2 3 MY 94 10 1 •, .OHMM 94' 22:0 10 3 OHM 94 22.0 9 3 OHMM 94 2 7 0 4 • API 94 y3101 1 L 8S 94. 6 3 5 0 3 API 94 31 -0 1 3 IN 94 280 2 74 G/C3 94 350 1 3 C/ C3 94 356 1 3 CPS 94 334 7c 3 CPS 94 334 30 3 CHAN 94 - 0 0 3 CPS 94 - 0 0 1:HAN 94 0 0 ____ 94 0 0 CPS 94 ,0 0 CPS' 94 0 0 CPS 94 0 0 CPS 94 0 0 CPS 94 0 0 94 4 0 0 S° P 194 890 7 PU 94 890 12 CPS 94 420 1 E P E bAS yy R FICATIONS PRC S I Z E L.YL SMPL 2 4 0 1 68 1 4 0 1 68 1 4 0 1 68 i 4 0 1 68 1 4 0 1 68 1 4 0 1 6A 4 0 1 68 1 4 0 1 68 1 4 0 1 .6 1 4 0 1, 8 1 4 0 1 68 1 4 0 1 68 1 4 0 1 68 1 4 0 1 68 1 4 0 1 68 1 4 0 1 6 r�1 1 4 0 1 68 1 4 0 1 68 1 4 0 1 AR 4 0 1 6 i 1 4 0 1 6 8 1 4 0 1 6 A 1 4 0 1 6 8 1 4 0 1 68 1 4 0 1 68 1 4 0 1 68 1 4 0 1 68 1 4 0 1 68 R C PROCESS INDICATOR: 000000 000000 000000 0000011 000000 000000 000000 000000 0.1„10000 000000 000000 000000 000000 000000 11!13100,0 000000 000000 000000 000000 000000 000000 0100000 000000 000000 000000 000000 0000011 000000 000000 - 000000 000000 000000 000000 00Iltj00 .000000 0001J110 000000 00000.0 000000 000000 000000 .000000 000000 .000000 000000 0001100 000000 000000 0.00000 00000.0 00000.0 000000 000000 000000 000000 000000 0000011 1,11. 111.E 1113 0001_130 000000 111301100 i l 0 1_f i t 01 0 1311131)00 1)13111)1, !1 131) 0131113 0130000 0000013 000000 00010011 000000 0110001,1 000000 000000 0130000 000000 000000 000000 1111013110 000000 000000 001,11111 000000 000000 1 4 CHI RECORDS DEPT TEN C AL I SP LLD L LS MSFL GR TEN GR CAL RHOB DRHO FCNL NCNL LS */P CUPE SS DP ..:Qf if:IL FS L D NS L. D Lt'( T LCC T SCCT PEF HP SS DP H I :RAT ...0*...........*,......... **.........1.40....* ..w...rv.....*.rv.. 4** _ 12482 . 000 2369 . .0.00 0.000 0.000 1.000 1.000 1.000 0.000 250 -999 . 250 -999 . 250 -999 , 250 _ , 251) -999.250 -999 . 250 -999 . ;250 - , 250 -999 , 250 -999 , 250 -999 . 250 -999 , 250 -999 , 250 -999 . 250 -999 , 250 -999.250 -999.250 -999.250 -999.250 1 2400 . 000 5009 , 00.0 8.020 67.000 77.983 74.473 A2 . 951 48.500 2 , 422 . 088 209,100 337 . 700 i 08 -700 1 . .022 1:08 , 67..0 1 , 0.00 7943 , 281 18663 . 793 1110 . 00.0 ;2363 . 000 14074 . 000 2 . 68.0 22.590 13.556 1.673 1 23.0 .0 . 000 511.0 ..000 9.500 60.200 15.812 14.555 17.579 117.800 5143, 000 90, 6.0.0 10 .. .09.0 2 . 622 . .022 - 70 -800 317 , ,.9 0 0 103 . 120 . 602 108 , 350 1 .110 4965 , 91A t64..1 , 617 693 , 000 1345 , 000 12U7 , 000 2.570 23.490 1.398 1.841 P 15 FILE — TRAILER **** File name: &C.45E01,002 Service name: Maximum lengt 1(124 :*** FILE HEADER **** File name: Maximum length: 1024 Service name: TRAILER R File type: LO Next file: File type: LO Previous file: C IR Version *: Date: Version it: Date: MNEM CN WN FN OUN STAT CTRY APIN L-ATI LONG SECT TOWN RANG EKB EDF EGL PD LMF DMF RUN TIME DATE LCC SON LUN FL LUL ENGI WITN DD DL CBDi TLI BLI TCS TLAB BHT MRT MT MSS DFD MYIS DFPH DFL RM RMF MFST MFSS RMC CONTENTS ^��8��� ~� ���U RECORDS � 0�� ���U'U U � �U� EXPLORATION . . . . .. . . .. .. .. . . 1-63/T-22 MPI API NIM/ 50-029-21905. . . . . . . . of .. . . . . EN I OTT DATE LOGGED: 02-21-89. . . . .. .. .. .. .. .. NORTH SLOPE .. .. Zr .' .. .. .^ .. .. t. rd . . .. '. .. .. .. '' ALASKA . .. . . . . .. $0 . . . ^ . . . . 00 $0 00 . ` .. .. . . . . USA . .. . . .. .. .. . . . . . . . . . . . . . . . . Se .. . . . . 21905 .000. .. .. .. . . . . . . . . . . '. . . .. Ft .. .. ' . . . . . . ' . . CS .. . . . ^ UNIT TYPE CATG SIZE CODE ERROR 0 0 40 65 0 0 40 65 0 0 20 65 0 0 20 A5 0 0 20 65 0 0 Min, O. 0 Sec. N . . .. .. . . .. . . .. . . . . .. .. .. 0 0 34 A5 0 Deg. .0 M i n , 0 , O Sec, W . . .. it . . . . . . . . .. .. .^ .. . . 0 0 34 65 F FT 0 3 4 FT 4 0 2 65 8 3 2 65 4 65 146 . 1 ' . . . . . . . ' ' . . . ^ ' . . . ' . . . ' . . . ' . . ^ . . . . . . . . . , . . . . . . . . . . . 12N ^ . . . . ^ .. ^. ' . . . ' . . . .. . . .' .. '' '. ." .. . . ' . . . . . . . . . .. ,. ^ . 16E 01t$400X020200$042Ci$47240$220210101222020110024tft$2 F .;5. 8 . ^ , . .. .. ^ . . . .. .. .. , . , . .. .. , . .. .. . . . . . . . . .0 . . .. . . . . 0 2 . 000t0SPIR00$0002400,0901 . 07324104000/1101i0r410f1 2 1/02001 14 25004012/02/7,212701010461,224001404024201101$4220124fAt MS 000f$1001211$0112.204$1140S117$02010,111SliCt2100211S11120 ~°' ' ' ' ^ ' ' ' ' ' ' ' ' ^ ' ' ' ' ' ' ` ' ^ ' ' ' ' ' ' ' ' ' ' ' ' ' '' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ... . .. . . . . .. . . . . . . .. .. .. . . .. .. .. . . . . .. . . , . . . . . . . . . .. . . . 1 . . . . . . . . . .. .. . , . . . . .. .. . . .' .' .. . . .. .. . . . . . . . . . . . . .. .. . . 0 79 0 0 4 68 0 0 65 1813 .0O0..........^...'........'.........'.......'.....' 21/ 2/89. . .. .. .. . . . . .. .. . . . . .. .. .. .. .. . . .^ . . . . ' . . . .. .. . . 3 O . . .. . . . . .. . . .. .. .. .. .. . . . . .. .. .. .. .. . . . . . . .. . . . . .. .. . . 0 0 2 79 025 . . . . .. . . . . .. .. .. . . .. .. .. .. .. . . . . .. . . . . .. .. . . .. .. 0 10 7611 .. . . . . . . . . . . . . . . . . . . .. . . .. . . . . . . . . . . , . . . .. . . . . 0 0 10 MORTPE . . .. . . . ^ . . . . . . . . .. . . . . . . . . . . .. .. . . . ' 0 HORT SLOPE 0 20 P R E S S L E Y .. .. . . .. .. .. .. .. .. . . .. . . . . .. .. .. . . . . U 0 20 65 ZARNDT .. . . . . .. .. , . . . . . . . . . . . . . . . . . . . . . .. . . O 0 20 A5 1 3 1 6.800. .. .. ^ .. . . .. .. . . .. . . .. .. .. .. . . . . . . . . .. .. .. . . . . FT 0 4 0 -800. . . . .. . . . . . . . . . . it . . .. .. .. .. to .. It ii . ■ Is to a; . . . . . . F 4 68 11790A00 , .. .. . . . . .. . . .. . . . . .. .. . . .. .. . . . . . . .. . . . . .. .. . . FT 4 68 i 1 W . . .. .. .. . . . . . . .. . . . . .. .. . . . . . . . . . . . . . . .. . . .. . . . . 4 68 1 3 0 . O U 0 . .. .. . . . . . . . . .. . . .. .. . . .. .. .. . . . . . . . . .. .. .. . . . . 4 6 1 044.00Q. . . .. . . 06 .. . . . . . . .. .. . . . . . . . . . . . . . . . . . . . . .. .. . . FT 0 7 4 6 10 .300. . . . .. .. . . .. .. .. .. . . .. .. .. .. .. .. . . . . . . . . . . . . .. .. . . HR 0 4 68 22 .08 . . . . . . . . . . . . . . . . . . . . . . . . .. .. .. .. . . . . . . . . . . . . . . . . . . HR 0 4 4 68 19 .8 0 . . . .. . .. . . . .. . . . . . . . .. .. .. DEGF 0 i 4 68 . . . . ' . ' . .. . . . ' . . . . . �. '' 1 . . . .. .. . . . . .. . . .. . . .. .. .. .. . . .. . . . . . . . . . . . . .'. . . . . DEQF 0 LI NOSULF. 0 20 65 CIRCULATED . . .. . . .. . . . . .. . . . . . . . . . . . . . . . . .. .. . . 0 20 A5 9.80 . . . . . .. .. . . . . . . . . . . . . .. .. . .. .. .. . . . . . . . . . . . . . . . LB/G 0 68 7 . U O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CP 0 8 10 .5 . 00 , . .. . . .. . . . . . . . . .. . . .. .. .. .. . . .. . . . . . . .. . . .. .. .. .. U 4 68 5,900 . . . . . . . . . .. . . 20 0 4 68 1 360. . . . . .. .. al .. .. .. .. . . .. .. .. .. It .. .. . . . .. . . .. .. . .. O H M M 0 4 ' 9 2 O . . . . . . .. . . . . . . . . .. .. . . .. .. . . . . .. .. . . . . . .. . . . . .. . . . . OHMM 0 2 4 68 68.O08 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DEQF 0 2 4 68 MEAS. . . .. .. . . . . .. . . .. . . .. . . .. .. . . . . . . .. . . . . . . . . . . 0 2 12 65 1.470,— . .. .. .. .. . . . . . . .. . . .. .. .. .. .. .. . . . . . . . . . . . . .. .. . . OHMM 0 2 4 68 Page 17 CONTENTS 1� �������������� l� ���� �������������� �0�� ���U'8� U � �U� ��������� 68 .00 0. . .. .. .. .. . . ^ . . . . . ' . .^ .' .. ', ^' .. . . . ^ .^ .. . . . . . . '. .' KEAS . . ' ^ . ^ . . '. ' ^ .. .. .. .. .. . . ' ' ' . '. . . ' . to .. .. . ' �.��.. . . . . . . .. .. .. . . . . .. . . .. It . . . . *8 DI . . . . . . . . . . .. .. . . 8 .508 . ' . . It . . . . . ' ^ ' . . ^ . 20 4788 78 ' . . . . . . . . . ` . ' . . ' . ' et ' . ' . UNIT TYPE CATG S1 DEGF 0 12 0 3 4 0 4 Page 18 CODE ERROR --~- ----- Well Location Comment 1 t SURFACE; 2213 FNL & 22'3' FEL Well Location Comment 2; Well Location Comment 3: BP EXPLORATION -63/T-22 MPI Well Location Comment 4 Well File Comment 1 DLL/MSFL TOOL STUCK AT 12A89', CLOSED CALIPER/POWER LOCKOUT Well File Comment 2: ON LATEROLOG FROM 12614' - 12672', SLD/CNS TOOL PULLED TIGHT Well File Comment 3: AT 12816. CLOSED CALIPER TO GET FREE. REOPENED CALIPER AT Well File Comment 4! 12788', DID HOT LOG T,D, AT CUSTOMER REQUEST, ******************************************************************************** ** LIS tape written by: ANCHORAGE. COMPUTING CENTER ** All curve and tool mnemonics used are those which most closely match ** Gearhart curve and tool mnemonics, ******************************************************************************** GEARHART TO SCHLUMBERGER TOP BOTTOM MNEM SERVICE • UNIT' MNEM SERVICE UNIT DEPTH DEPTH DEPTH GR4 TEN4 MMENT RECORD FT DEPT FT 11344,00 13065.00 DLLMSF API GR DLLMSF API 11344.50 11848.00 DLLMSF LBS TEN DLLMSF LBS 11344,50 11848,00 * * * * ** *********************** *** ENTRY BLOCKS **** *********************** ENTRY ***************************** *** ENTRY BLOCK LEGEND **** ***************************** TYPE DESCRIPTION 16 Datum specification block sub-type 0 Terminator ( no more entries ) DATA FOR AT SPECIFICATIONS TYPE SIZE CODE i lAttiOttA4Ittigtit, ,tt7tait114 16 1 A6 4r417.4tli 1 66 Page CHTA 1:13 .************************************* • '*** DATUM •SPECIFICATIQW BLOCKS **** 'w***********www****************w***** ^U AT SPECIFICATION SERVICE SERVICE API API API API FILE PRC # MNEM ID ORDER * UNIT LOG TYPE CLASS MOD * SIZE LYL SMPL RC PROCESS INDICATORS __________________ DEPT 1 U 0 4 0 1 68 .000000 100000 000 (74R DLLMSF 135125 API 94 '31.0 1 2 � 4 0 1 68 000000 000000 000000 TEN 0LLMSF 135025 LDS 94 635 0 .7) 2 4 0 1 68 000000 000000 000000 Page DEPT GR TEN 11848.0OO 11800.800 11700.0O0 1160O.0U0 11.500.000 11400.0O0 0.0O0 63.70O 91.90U 98.98U 126.800 67.100 4783.008 4752.000 4652.0U8 4636.000 4614.000 4555.000 CHTH . RECn 'DS ^*********************** '*** FILE TRAILfZR **** *********************** File name: &Q5F01.003 Maximum length: __________ '*********************** '*** REEL TRAILER **** '********+************** Service name: &G5FO1 Next reel/ Comments; '*********************** '*** TAPE TRAILER **** '*********************** Service name: &G5F01 Next tape: Comments; Service name: TRAILER ECO 1024 File type: LO Next file: Date/ 89/02/24 Origin: Date: 89/02/24 Origin: Version #: Real name: Tape name: Date: 135025 Continuation #; 01 Page 23 135025 Continuation #/ 01