Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout221-011CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Rixse, Melvin G (OGC) To:Ryan Lewis Subject:20251203 1115 APPROVAL FOR lighter fluid MP L-06 PTD:221-011 Date:Wednesday, December 3, 2025 11:17:02 AM Ryan, Hilcorp is approved to perform work on Sundry 325-704 with the two tested mechanical barriers on the IA as you described. If for some unforeseen reason, loss of integrity of one of the mechanical barriers is observed, Hilcorp should notify AOGCC for an approved plan forward and possible circulation of a KWF in T x IA. Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-297-8474 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov). From: Ryan Lewis <ryan.lewis@hilcorp.com> Sent: Tuesday, December 2, 2025 6:17 PM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Subject: MP L-06 PTD:221-011 Mel- In Sundry 325-704, step 5 I said we were going to circulate KWF as 1 of our barriers. We set and tested an EVO-trieve in the tubing tail @ 10,396’ and tested the tubing to 2500 psi and it passed. In the tubing we will have the EVO-trieve and BPV for 2 mechanical barriers and in the IA with the packer and casing we will have 2 mechanical barriers. I am requesting to circulate source water and FP in the tubing and IA before I close the SS, instead of KWF since I was able to get a 2nd mechanical barrier on the tubing side. Thanks, Ryan Lewis Hilcorp Alaska – Operations Engineer (303) 906-5178 Ryan.lewis@hilcorp.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Cut Conductor Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Weld External Casing Patch 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number): 10. Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 12,671' N/A Casing Collapse Conductor N/A Surface 2,020psi Production 5,410psi Solid Liner 7,820psi Slotted Liner 11,780psi Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Wells Manager Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng 7” x 4-1/2” Premier Production Pkr and N/A 10,356 MD/ 6,881 TVD and N/A Ryan Lewis ryan.lewis@hilcorp.com 303-906-5178 12,492' Perforation Depth MD (ft): 10,775' See Schematic 2,073' See Schematic 4-1/2" 7,165'2-3/8" 115' 13-3/8" 9-5/8" 7" 6,314' 3-1/4"345' 11,068' MD N/A 8,620psi 3,520psi 7,240psi 4,590' 7,299' 7,067' 6,314' 10,564' Length Size Proposed Pools: 115' 115' 12.6# / L-80 / TXP BTC TVD Burst 10,472' 11,200psi STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025509, ADL0047434 221-011 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22003-01-00 Hilcorp Alaska LLC C.O. 816 AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): 11/25/2025 Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY MILNE PT UNIT L-06A MILNE POINT KUPARUK RIVER OIL N/A 7,174' 12,505' 7,166' 2,866 N/A Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2025.11.17 16:21:35 - 09'00' Taylor Wellman (2143) 325-704 By Grace Christianson at 7:34 am, Nov 18, 2025 SFD 11/18/2025 DSR-11/19/25 * AOGCC to witness surface casing repiar before replacing conductor pieces. MGR21NOV25 10-404 11/21/25 Surface Casing Leak Repair Well: MPL-06A PTD: 221-011 Well Name:MPL-06A API Number: 50-029-22003-01-00 Current Status:SI Jet Pump Producer Rig:SL + WSS Estimated Start Date:November 25, 2025 Estimated Duration:28 days Reg.Approval Req’std? Date Approval Rec’vd: Regulatory Contact: Permit to Drill Number:221-011 First Call Engineer:Ryan Lewis Second Call Engineer:Jessica Worthington Current Bottom Hole Pressure: Max Bottom Hole Pressure: Max. Proposed Surface Pressure: Recent SI Tubing Pressure: Min ID: 3551 psi @ 6,848’ TVD 3551 psi @ 6,848’ TVD 2866 psi 2050 psi 3.813” SS at 10,228’ (Based on BH Gauge on 2/09/24) (Based on BH Gauge on 2/09/24) (Based on .1psi/ft gas gradient) (Taken on 07/24/24) Brief Well Summary: MPU L-06 is a jet pump producer with suspected surface casing leak. The OA was tested with returns observed to surface at 120 psi. Multiple attempts were made to strap the surface casing leak with non-conclusive results of 24’10” and 21’10”. A surface casing excavation repair is being planned to repair the well. Conventional shoring materials and methods will be used to safely excavate around the well. Once shoring is in place, the conductor will be cut and casing patch welded over the leak. Objective: Excavate and weld external surface casing patch to restore OA integrity. Notes On Wellbore Condition: PX Plug Set at 10,288’ MD on 01/09/2024 CMIT-TxIA to 3150 psi on 01/10/2024, pass-well secure OA test at 120 psi on 01/08/2024, returned fluids to surface MIT-OA to 2000 psi on 01/10/2012, pass Leak depth evaluation on 01/11/2024, returned straps at 24’10” and 21’10”; inconclusive leak depth Procedure: Prep work: 1. RU SL. Pressure test PCE. 2. Pull prong and PX plug in the SS. 3. Open the SS. 4. RIH and get a SBHPS. 5. Based on the result, confirm with OE, circulate KWF around the tubing and IA. Confirm the KWF freeze point is below 20 degree F and Spot 2 bbls of FP on the IA. Bullhead KWF down to the slotted liner. Spot 2 bbls of FP on the tubing. The FP is just to protect the surface wellhead from freezing. Call with OE questions. 6. Close SS. 7. Set the PX plug and prong in the SS. 8. RD SL 9. Test the tubing to 1500 psi. 10. Bleed off 11. Test the IA to 1500 psi. 12. Bleed off Surface Casing Leak Repair Well: MPL-06A PTD: 221-011 Well Repair Procedure: 13. Complete ACWR 14. Confirm 0 psi on the T/I/O. Install BPV. 15. Remove and cut away cellar 16. Excavate to full shoring depth, up to 25’ below grade, (depending on allowable soil conditions for shoring) Well head prep: 17. Secure well 18. Nipple down tree and master 19. Nipple down master 20. Nipple up cross-overs to tubing head adapter and connect to well support structure knuckle flange 21. Sniff cellar and adjacent area with multi-gas meter for LEL, CO, H2S and 02. Ensure confined space, egress and ventilation is adequate for operations Sundry Work (Approval required to proceed) Surface Casing Repair 22. Install OA purge and LEL/gas monitoring equipment a. Install required ventilation b. Pump 1-2 barrels of either 60/40 KCl or glycol to flush hydrocarbons through holes c. Install OA purge equipment with either compressed air or N2 d. Purge with accurate gas readings and fluid returns observed e. Prior to drilling holes in the conductor, install continuous gas monitoring for LEL’s from the conductor 23. Investigate Leak Depth a. Drill holes at 3,6,9 and 12 o’clock positions (cold cutting drill bit) in the conductor 18” above bottom of excavation b. Pressure up OA with compressed air or N2 and observe for fluids through holes i. If fluid is observed to be actively coming from the hole at that depth, call engineer ii. If fluid is not observed to be actively coming from the holes, move 2’ up and repeat steps a and b, until fluid returns are observed through the conductor c. Flush conductor with water through holes until clean returns are observed 24. Rig up well support structure a. Level gravel foundation b. Place structural rig mats c. Install shims between girder and foundation beam to level structure (Do not use jacks to level the structure) d. Nipple up Wellhead Support Structure using the adjustable vertical post and haunches for proper height placement and compression loading 25. Cut away conductor a. Primary cutting option is to use an air arc torch but the Hot Work Permit for this portion of the job will dictate if an alternative cutting method will be required b. Cut conductor into manageable lengths (usually a mamixum of 10’ lengths) i. Two horizontal cuts and two vertical cuts will be required to remove the conductor i c. Chip away excess cement from the surface casing Surface Casing Leak Repair Well: MPL-06A PTD: 221-011 26. Inspect surface casing a. Buff and prepare surface casing for inspection b. Continue to clean out material between bottom of conductor cut and surface casing until well bonded cement is found 27. Weld surface casing patch a. At hole location, straddle rings/patch over hole and weld i. UT surface casing in patch area, inspecting for areas of casing wear ii. Mark and UT wedding band/ring locations on a grid to ensure sufficient thickness for welding and structural integrity iii. Fabricate sleeves in 5’ lengths 1. Suggest 4 rings/bands for fabrication a. Suggest fit up of beveled band directly to mandrel hanger 2. Suggest 3 ea, 5’ long sleeves for fabrication 3. Details for rings/sleeves included iv. Notify AOGCC opportunity to inspect repair 28. Test casing patch a. NDE: 100% VT, 100% MT b. OA test to 500psi and observe for leaks 29.*Contingency* if lowermost SC leak cannot be reached to directly repair by external casing patch: a. Clean out surface casing by existing conductor annulus to furthest extent possible (if not already done in step 25). b. Annulus should be cleaned with steam, surfactant (Halliburton Musol A-1 tote) and solvent wash (Halliburton Duel B-1 tote) followed by steam/hot water wash. c. Cement surface casing by conductor annulus to cut line (use FineCem mixing calculator to calculate how many Halliburton FineCem sacks) d. Weld conductor from cut to surface e. Perform second stage cement between surface casing and new conductor, bringing cement within 1ft of conductor top (use FineCem mixing calculator to calculate how many Halliburton FineCem sacks) f. Wait until cement develops 500 psi compressive strength per chart below before proceeding to next step g. Notify AOGCC for opportunity to inspect repair 30. Nipple down the WSS 31. Reinstall tree 32. Remove BPV and install TWC a. Pressure test tree to 5000psi 33. Backfill excavation and reinstall cellar and well house. 34. Re-install flowline and instrumentation 35. Pull TWC Slickline 36. MIRU SL unit and PT 37. Pull PX Plug Attachments: -Wellbore Schematics -Shoring Diagram * Replace and weld conductor from cut to surface. - mgr * Spaghetti string to be picked up and run in Conductor x SC annulus for circulation path. - mgr Weld conductor from cut to surface Surface Casing Leak Repair Well: MPL-06A PTD: 221-011 _____________________________________________________________________________________ Revised By: TDF 4/26/2023 PROPOSED Milne Point Unit Well: MPU L-06A Last Completed: 2/19/2021 PTD: 221-011 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8" Conductor 48# / H-40 / Weld 12.715 Surface 115' 0.157 9-5/8" Surface 36# / J-55 / BTC 8.921 Surface 6,314’ 0.0773 7" Production 26# / L-80 / BTC 6.276 Surface 10,564’ 0.0383 3-1/4” Solid Liner 6.6 # / L-80 / TCII 2.850 10,430’ 10,775’ 2-3/8” Solid/ Slotted Liner 4.7# / L-80 / Hyd 511 1.995 10,425’ 12,492’ TUBING DETAIL 4-1/2” Tubing 12.6# / L-80 / TXP BTC 3.958 ±10,310’10,472’ 0.0152 2-7/8” Tubing 6.5# / L-80 / EUE 8rd 2.441 Surface ±10,256 0.0058 JEWELRY DETAIL No Depth Item 1 ±200’ 2-7/8" x 1" GLM, 1/4" OV 2 ±9,998’ 2-7/8" x 1" GLM, DV installed 3 ±10,086’ 2-7/8” XN-nipple – 2.313 ID 4 ±10,138’ Ported Discharge Head: 5 ±10,139’ Pump: 6 ±10,196’ Gas Separator: 7 ±10,204’ Upper Tandem Seal: 8 ±10,211’ Lower Tandem Seal: 9 ±10,218’ Motor: 10 ±10,252’ Intake Sensor w/ Centralizer -Btm @ ±10,256’ 11 10,356’ 7” x 4-1/2” Premier Production Packer 12 10,425’ X Nipple, 3.813” 13 10,434’ WELG, bottom at 10,472’ 14 10,564’ 1st Whipstock 15 10,775’ 2nd Whipstock OPEN HOLE / CEMENT DETAIL 30" 485 sks Permafrost ‘C’ 12-1/4" 1469 sx Permafrost ‘E’, 410 sx Class ‘G’ 8-1/2” 328 sx Class ‘G’ 4-1/16” Uncemented Solid Liner 3” Uncemented Solid / Slotted Liner WELL INCLINATION DETAIL KOP @ 700’ Max Hole Angle = 100° @ 11,390’ A Top of Window @ 10,564’ TREE & WELLHEAD Tree 4-1/16” 5K CIW (dry hole) Wellhead FMC 11"x 4-1/2" Hanger, 4.5" TCII top/btm w/ 2- 3/8'' ports TD =12,671’(MD) /TD =7,174’(TVD) Halliburton HOS Cementer at 1,881’ Orig. KB Elev. = 56.0’ Ground Elev. = 21.0’ RKB-THF: 23.95’ (Doyon 16) 3 14 11 13 Cement Retainer @12,505’, 3” OH to TD Est. TOC at 8,820’ 9-5/8” Top of 3-1/4” Liner @ 10,430’ Est. TOC at 2,000’ 12 PBTD =12,505’(MD) /PBTD=7,166’(TVD) 3-1/2” XO 2-7/8” @10,952’ 2-7/8” @10,982’ 15 RA Tag at 10,304’ Arctic Pack Baker Flow Guard Liner Top Packer 10,419’ Top of Window @10,775’ Failed Whipstock @10,583’ Top of 2-3/8” Liner @ 10,425’ 4 2 1 PB2 @11,886’ 4-1/16” OH Top of Window @10,564’ Window @10,583’ PB1 @11,440’ 4-1/16” OH PB1 Billet @10,710’ 2-3/8” @12,492’ PB3 @12,133’ 3” OH PB3Billet @11,535’ Tubing Cut @ ±10,310’ 5 6 7 & 8 9 10 ` PLUGBACK DETAIL PB1: 10,710’ MD – 11,440’ MD – Billet set @10,710’ – 4-1/16” OH PB2: 10,775’ MD – 11,886’ MD – Whipstock set @10,775’ – 3-1/4” x 2-7/8” liner to 10,982’, 4-1/16” OH PB3: 11,535’ MD – 12,133’ MD – Billet set @ 11,535’ – 3” OH SLOTTED LINER DETAIL KUP Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup A2/A3 11,340’ 12,212’ 7,092’ 7,125’ 872’ 1/18/2022 Open Kup A2 12,304’ 12,492’ 7,141’ 7,165’ 188’ 1/18/2022 Open GENERAL WELL INFO API: 50-029-22003-01-00 Drilled and Completed by Pool Rig 102 - 11/27/1990 Pull ESP, set CIBP, Run Killstring by Doyon 16 - 5/21/2012 RWO Tubing Swap: 2/19/2021 A Sidetrack Completed: 1/20/2022Fish-Mill 1.78" x .55' (1.55" top of mill body)11,190' CTMD 4/21/22 TOP OF GROUND AND MODULARTRENCH SHIELDING SYSTEM8'X8' 4-SIDED BOX"BUILD-A-BOX" MODULARTRENCH SHIELDING SYSTEMAPPROXIMATE LOCATIONOF HOLE IN OA CASING13'-0"13'-0"12'-0"12'-0"8'-0"7'-0"8'-0"7'-0"8'X8' 4-SIDED BOX"BUILD-A-BOX" MODULARTRENCH SHIELDING SYSTEM7'X7' 4-SIDED BOX"BUILD-A-BOX" MODULARTRENCH SHIELDING SYSTEMPERMAFROST, TYPE A, B, OR C-60 SOILPERMAFROST, TYPE A, B, OR C-60 SOIL24'-10"L-06SURFACECASINGL-06 SURFACECASING8'X8' 4-SIDED BOX"BUILD-A-BOX" MODULARTRENCH SHIELDING SYSTEM7'X7' 4-SIDED BOX"BUILD-A-BOX" MODULARTRENCH SHIELDING SYSTEM7'-0"8'-0"7'X7' 4-SIDED BOX"BUILD-A-BOX" MODULARTRENCH SHIELDING SYSTEMCLEAR DISTANCE BETWEEN BOX AND GROUNDSHALL NOT EXCEED 6 INCHES, BACKFILL WITHANGULAR GRAVEL AS NEEDED.BENCHING REQUIRED IF FURTHEREXCAVATION IS MADE.NO MORE THAN 2 FEET EXCAVATIONBELOW THE BOTTOM OF BOX. 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Surface Casing Repair 2.Operator Name: 4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number): 10. Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 12,671'N/A Casing Collapse Conductor N/A Surface 2,020psi Production 5,410psi Solid Liner 7,820psi Slotted Liner 11,780psi Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Wells Manager Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng MILNE POINT KUPARUK RIVER OIL N/A 7,174' 12,505' 7,166' N/A N/A Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY MILNE PT UNIT L-06A AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): 9/1/2024 Subsequent Form Required: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025509, ADL0047434 221-011 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22003-01-00 Hilcorp Alaska LLC C.O. 432E Length Size Proposed Pools: 115' 115' 12.6# / L-80 / TXP BTC TVD Burst 10,472' 11,200psi MD N/A 8,620psi 3,520psi 7,240psi 4,590' 7,299' 7,067' 6,314' 10,564' 115' 13-3/8" 9-5/8" 7" 6,314' 3-1/4"345' 11,068' 10,775' See Schematic 2,073' See Schematic 4-1/2" 7,165'2-3/8" 7” x 4-1/2” Premier Production & Baker Guard LTP and N/A 10,356 MD/ 6,881 TVD & 10,419 MD/ 6,917 TVD and N/A Ryan Lewis ryan.lewis@hilcorp.com 303-906-5178 12,492' Perforation Depth MD (ft): No Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 8:12 am, Aug 20, 2024 Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2024.08.19 21:47:47 - 08'00' Taylor Wellman (2143) 324-476 10-404 DSR-8/21/24 2866 PX at 10,288 MGR11SEP24 SFD 8/20/2024*&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2024.09.13 21:01:20 -04'00'09/13/24 RBDMS JSB 091724 Surface Casing Leak Repair Well: MPL-06A PTD: 221-011 Well Name:MPL-06A API Number: 50-029-22003-01-00 Current Status:SI Jet Pump Producer Rig:SL + WSS Estimated Start Date:September 1, 2024 Estimated Duration:28 days Reg.Approval Req’std? Date Approval Rec’vd: Regulatory Contact: Permit to Drill Number:221-011 First Call Engineer:Ryan Lewis Second Call Engineer:Jessica Worthington Current Bottom Hole Pressure: Max Bottom Hole Pressure: Max. Proposed Surface Pressure: Recent SI Tubing Pressure: Min ID: 3551 psi @ 6,848’ TVD 3551 psi @ 6,848’ TVD 2866 psi 2050 psi 3.813” SS at 10,228’ (Based on BH Gauge on 2/09/24) (Based on BH Gauge on 2/09/24) (Based on .1psi/ft gas gradient) (Taken on 07/24/24) Brief Well Summary: MPU L-06 is a jet pump producer with suspected surface casing leak. The OA was tested with returns observed to surface at 120 psi. Multiple attempts were made to strap the surface casing leak with non-conclusive results of 24’10” and 21’10”. A surface casing excavation repair is being planned to repair the well. Conventional shoring materials and methods will be used to safely excavate around the well. Once shoring is in place, the conductor will be cut and casing patch welded over the leak. Objective: Excavate and weld external surface casing patch to restore OA integrity. Notes On Wellbore Condition: x PX Plug Set at 10,288’ MD on 01/09/2024 x CMIT-TxIA to 3150 psi on 01/10/2024, pass-well secure x OA test at 120 psi on 01/08/2024, returned fluids to surface x MIT-OA to 2000 psi on 01/10/2012, pass x Leak depth evaluation on 01/11/2024, returned straps at 24’10” and 21’10”; inconclusive leak depth Procedure: Pre-Sundry Work Prep Work 1. Secure well 2. Install BPV 3. Nipple down tree and master 4. Nipple down master 5. Nipple up cross-overs to tubing head adapter and connect to well support structure knuckle flange 6. Sniff cellar and adjacent area with multi-gas meter for LEL, CO, H2S and 02. Ensure confined space, egress and ventilation is adequate for operations Well Repair Procedure: 1. Complete ACWR 2. Remove and cut away cellar 3. Excavate to full shoring depth, up to 17’ below grade, (depending on allowable soil conditions for shoring) Surface Casing Leak Repair Well: MPL-06A PTD: 221-011 Sundry Work (Approval required to proceed) Surface Casing Repair 4. Install OA purge and LEL/gas monitoring equipment a. Install required ventilation b. Pump 1-2 barrels of either 60/40 KCl or glycol to flush hydrocarbons through holes c. Install OA purge equipment with either compressed air or N2 d. Purge with accurate gas readings and fluid returns observed e. Prior to drilling holes in the conductor, install continuous gas monitoring for LEL’s from the conductor 5. Investigate Leak Depth a. Drill holes at 3,6,9 and 12 o’clock positions (cold cutting drill bit) in the conductor 18” above bottom of excavation b. Pressure up OA with compressed air or N2 and observe for fluids through holes i. If fluid is observed to be actively coming from the hole at that depth, call engineer ii. If fluid is not observed to be actively coming from the holes, move 2’ up and repeat steps a and b, until fluid returns are observed through the conductor c. Flush conductor with water through holes until clean returns are observed 6. Rig up well support structure a. Level gravel foundation b. Place structural rig mats c. Install shims between girder and foundation beam to level structure (Do not use jacks to level the structure) d. Nipple up Wellhead Support Structure using the adjustable vertical post and haunches for proper height placement and compression loading 7. Cut away conductor a. Primary cutting option is to use an air arc torch but the Hot Work Permit for this portion of the job will dictate if an alternative cutting method will be required b. Cut conductor into manageable lengths (usually a mamixum of 10’ lengths) i. Two horizontal cuts and two vertical cuts will be required to remove the conductor i c. Chip away excess cement from the surface casing 8. Inspect surface casing a. Buff and prepare surface casing for inspection b. Continue to clean out material between bottom of conductor cut and surface casing until well bonded cement is found 9. Weld surface casing patch a. At hole location, straddle rings/patch over hole and weld i. UT surface casing in patch area, inspecting for areas of casing wear ii. Mark and UT wedding band/ring locations on a grid to ensure sufficient thickness for welding and structural integrity iii. Fabricate sleeves in 5’ lengths 1. Suggest 4 rings/bands for fabrication a. Suggest fit up of beveled band directly to mandrel hanger 2. Suggest 3 ea, 5’ long sleeves for fabrication 3. Details for rings/sleeves included iv. Notify AOGCC opportunity to inspect repair Surface Casing Leak Repair Well: MPL-06A PTD: 221-011 7. Test casing patch a. NDE: 100% VT, 100% MT b. OA test to 500psi and observe for leaks 8.*Contingency* if lowermost SC leak cannot be reached to directly repair by external casing patch: a. Clean out surface casing by existing conductor annulus to furthest extent possible (if not already done in step 25). b. Annulus should be cleaned with steam, surfactant (Halliburton Musol A-1 tote) and solvent wash (Halliburton Duel B-1 tote) followed by steam/hot water wash. c. Cement surface casing by conductor annulus to cut line (use FineCem mixing calculator to calculate how many Halliburton FineCem sacks) d. Weld conductor from cut to surface e. Perform second stage cement between surface casing and new conductor, bringing cement within 1ft of conductor top (use FineCem mixing calculator to calculate how many Halliburton FineCem sacks) f. Wait until cement develops 500 psi compressive strength per chart below before proceeding to next step g. Notify AOGCC for opportunity to inspect repair 9. Nipple down the WSS 10. Reinstall tree 11. Remove BPV and install TWC a. Pressure test tree to 5000psi 12. Backfill excavation and reinstall cellar and well house. 13. Re-install flowline and instrumentation 14. Pull TWC Slickline 15. MIRU SL unit and PT 16. Pull PX Plug Attachments: -Wellbore Schematic Surface Casing Leak Repair Well: MPL-06A PTD: 221-011 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Surface Casing Repair 2.Operator Name: 4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number): 10. Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 12,671'N/A Casing Collapse Conductor N/A Surface 2,020psi Production 5,410psi Solid Liner 7,820psi Slotted Liner 11,780psi Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Wells Manager Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng MILNE POINT KUPARUK RIVER OIL N/A 7,174' 12,505' 7,166' N/A N/A Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY MILNE PT UNIT L-06A AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): 2/10/2024 Subsequent Form Required: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025509, ADL0047434 221-011 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22003-01-00 Hilcorp Alaska LLC C.O. 432E Length Size Proposed Pools: 115' 115' 12.6# / L-80 / TXP BTC TVD Burst 10,472' 11,200psi MD N/A 8,620psi 3,520psi 7,240psi 4,590' 7,299' 7,067' 6,314' 10,564' 115' 13-3/8" 9-5/8" 7" 6,314' 3-1/4"345' 11,068' 10,775' See Schematic 2,073' See Schematic 4-1/2" 7,165'2-3/8" 7” x 4-1/2” Premier Production & Baker Guard LTP and N/A 10,356 MD/ 6,881 TVD & 10,419 MD/ 6,917 TVD and N/A Todd Sidoti todd.sidoti@hilcorp.com 777-8443 12,492' Perforation Depth MD (ft): No Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2024.01.19 09:48:17 - 09'00' Taylor Wellman (2143) 324-023 By Grace Christianson at 11:58 am, Jan 22, 2024 10-404 DSR-1/26/24SFD 1/29/2024MGR01MAR24*&: Brett W. Huber, Sr.Digitally signed by Brett W. Huber, Sr. Date: 2024.03.04 10:39:39 -09'00'03/04/24 RBDMS JSB 030524 MPU L-06A Surface Casing Leak Repair 1/16/2024 Well Name: MPU L-06A API Number: 50-029-22003-01-00 Current Status: Producer Pad: L-Pad Estimated Start Date: February 10, 2024 Rig: N/A Regulatory Contact: Tom Fouts Permit to Drill Number: 221-011 First Call Engineer: Todd Sidoti (907) 777-8420 (O) (907) 632-4113 (M) Second Call Engineer: Taylor Wellman (907) 777-8449 (O) (907) 947-9533 (M) Brief Well Summary & Objective: MPL-06A is a Kuparuk producer with a CTD lateral in the Kuparuk A2/A3 sands. A workover was completed in 2021 swapping the tubing. A CTD sidetrack was completed in 2022 after a previous failure in 2021. Later in 2022 service coil was used to pump cement to isolate potential solids from the parent bore. The well failed an MIT-OA in January 2024 with fluid surfacing from the conductor by surface casing anulus. Current well condition: 1. PX plug installed in SSD profile at 10,288’. 2. CMIT T-IA passed to 3000 psi on 1/9/2024. 3. Leak depth determination has been inconclusive, we are only able to establish that the maximum depth is 22’ below grade. From experience (similar situation in PBU W-205) we anticipate the leak to be at a shallower depth of ~10-12’. Well Repair Procedure: 1. Begin to document daily work with a high level activity log. Include 1-2 photos and a one sentence summary of each day’s activities. The log will be submitted to the AOGCC with the 10-404 at job completion. 2. RD well house and flowlines. 3. Complete an ACWR (Area Civil Work Request) which includes a location for all utilities, thermosyphons, and any underground infrastructure. 4. Dig out and remove cellar. 5. Excavate 10’ below grade. a. Qualified person must be on-site for daily sign off on excavation per OSHA requirements, every 24 hours. b. Install sump area and dewater as necessary. c. In instances of excessive ground water inflow, previous excavation repairs have benefited from placing a sump pump in a hole in front of or adjacent to well. 6. Install Build-A-Box shoring system as required. a. Assume class B soils (frozen ground). b. Maintain top of box minimum 1 feet above grade. c. Install ventilation fans and heater trunks (excavation is over 8 feet); follow approved ventilation plan. 7. Egress. OSHA requires one form of egress; install Davit winch on top box section, Davit to remain above grade at all times. fluid surfacing from the conductor by surface casing anulus. MPU L-06A Surface Casing Leak Repair 1/16/2024 8. Drill test hole with cold-cutting drill bit in conductor at ~9.5’ below grade and sniff for LELs. 9. Circulate water into OA taking returns from the conductor until clean. a. If fluid or soft, broken cement is observed, continue to excavate and test in 1’ intervals until deepest allowable excavation depth is reached: 17’ in frozen soil using the Build- A-Box system. b. Once no fluid and hard, good cement is observed behind hole, proceed to next step. 10. Clear and level pad area around well. a. The well support structure will be used to support the wellhead. The positions where the support legs will be placed need to all be level and at the same elevation. 11. Spot rig mats and containment for support structure. 12. RU crane. Set BPV. ND tree and RD Crane. 13. MIRU well support structure and secure to tubing head adapter. 14. Transfer 50,000# of wellhead load to the well support structure per operating manual. a. Monitor wellhead during load transfer and stop if any movement is observed. 15. Cut and remove 13-3/8” (non-insulated) conductor. a. Two horizontal cuts in the 13-3/8” conductor (one below the slips and one at deepest drilled hole) and two vertical cuts will be required for removal. b. Primary cutting option is to use an air arc torch but the Hot Work Permit for this portion of the job will dictate if an alternative cutting method will be required. c. Use of a N2 cap/purge will be determined on site prior to proceeding. 16. Remove outer 13-3/8” conductor and cement. a. Remove the cement between 13-3/8” conductor and surface casing to the furthest extent possible, until clean, hard bonded cement is observed. i. This can require steaming and a vac truck. 17. Prep well for repair. a. Evacuate fluid level in 9-5/8” surface casing below bottom welding location to avoid heat sink from casing to fluid on backside. b. Buff and prepare the surface casing for inspection and welding. c. UT inspection of the exposed surface casing. d. Sleeve wedding band locations to be identified, marked and UT’d on a grid for nominal wall thickness verification. e. If UT shows wall thickness <80% nominal, deepen the excavation and remove more 13- 3/8” conductor to ensure the corrosion has been straddled. i. Note that maximum excavation depth is 17’ in frozen soil for the Build-A-ox system. If unable to uncover good pipe contact OE for further discussion. f. Once UT shows wall thickness >80% nominal, continue to Weld Surface Casing Sleeve steps. g. Surfactant/solvent wash the annulus between the casing and conductor, steam rinse. h. Apply 2-part Belzona to seal any observable holes in the 9-5/8” surface casing and let cure for recommended time. Weld Surface Casing Sleeve: MPU L-06A Surface Casing Leak Repair 1/16/2024 18. Notify AOGCC inspector for opportunity to inspect surface casing condition and casing sleeve welding operations. 19. Weld casing sleeve. a. Ensure welder qualifications. i. WPS/PQR: 4130 to X52 for welding top band to starting head. ii. WPS/PQR: J-55 to X52 for welding bands to surface casing. iii. WPS/PQR: X52 to X52 for welding bands and sleeve. b. Dry fit casing sleeve/banding to ensure compatibility and positioning. c. Maintain open bleed on OA. d. Verify air movers/ventilation and establish a fire watch. e. Install N2 purge equipment i. N2 cap/purge above leak. ii. Prior to welding, install continuous four-way gas meter for LEL’s and N2 on downstream side of purge. f. Install wedding bands and sleeve in accordance with sleeve design and weld package, continuously monitoring weld temperatures. i. Melting sticks are not permitted. g. NDE weld. h. Leak check casing with 100 psi N2. 20. Fit up and weld 13-3/8” conductor back together. a. Do not re-install conductor “dust-cover”. 21. Cement surface casing by conductor annulus to within 1” of conductor top. 22. Pull shoring while backfilling around the conductor and re-install cellar. 23. RDMO well support structure. 24. RU crane and NU production tree. 25. Test tree to 500 psi low/5,000 psi high. Pull BPV. 26. RD crane. 27. RU well house and flowlines. MPU L-06A Surface Casing Leak Repair 1/16/2024 Excavation Example Schematic _____________________________________________________________________________________ Revised By: TDF 1/16/2024 SCHEMATIC Milne Point Unit Well: MPU L-06A Last Completed: 2/19/2021 PTD: 221-011 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8" Conductor 48# / H-40 / Weld 12.715 Surface 115' 0.157 9-5/8" Surface 36# / J-55 / BTC 8.921 Surface 6,314’ 0.0773 7" Production 26# / L-80 / BTC 6.276 Surface 10,564’ 0.0383 3-1/4” Solid Liner 6.6 # / L-80 / TCII 2.850 10,430’ 10,775’ 2-3/8” Solid/ Slotted Liner 4.7# / L-80 / Hyd 511 1.995 10,425’ 12,492’ TUBING DETAIL 4-1/2” Tubing 12.6# / L-80 / TXP BTC 3.92 Surface 10,472’ 0.0152 JEWELRY DETAIL No Depth Item 1 31’ 4-1/2” Tubing Hanger 2 10,280’ Gauge Carrier 3 10,288’ HES X-line Sliding Sleeve w/ PX Plug Installed 4 10,296’ Ported Pressure Sub 5 10,356’ 7” x 4-1/2” Premier Production Packer 6 10,425’ X Nipple, 3.813” 7 10,434’ WELG, bottom at 10,472’ 8 10,564’ 1 st Whipstock 9 10,775’ 2 nd Whipstock OPEN HOLE / CEMENT DETAIL 30" 485 sks Permafrost ‘C’ 12-1/4" 1469 sx Permafrost ‘E’, 410 sx Class ‘G’ 8-1/2” 328 sx Class ‘G’ 4-1/16” Uncemented Solid Liner 3” Uncemented Solid / Slotted Liner WELL INCLINATION DETAIL KOP @ 700’ Max Hole Angle = 100° @ 11,390’ A Top of Window @ 10,564’ TREE & WELLHEAD Tree 4-1/16” 5K CIW (dry hole) Wellhead FMC 11"x 4-1/2" Hanger, 4.5" TCII top/btm w/ 2- 3/8'' ports TD =12,671’(MD) / TD =7,174’(TVD) Halliburton HOS Cementer at 1,881’ Orig. KB Elev. = 56.0’ Ground Elev. = 21.0’ RKB-THF: 23.95’ (Doyon 16) 3 8 5 7 Cement Retainer @12,505’, 3” OH to TD Est. TOC at 8,820’ 9-5/8” Top of 3-1/4” Liner @ 10,430’ Est. TOC at 2,000’ 6 PBTD =12,505’(MD) / PBTD=7,166’(TVD) 3-1/2”XO 2-7/8” @10,952’ 2-7/8” @10,982’ 9 RA Tag at 10,304’ Arctic Pack Baker Flow Guard Liner Top Packer 10,419’ Top of Window @10,775’ Failed Whipstock @10,583’ Top of 2-3/8” Liner @ 10,425’ 4 2 1 PB2 @11,886’ 4-1/16” OH Top of Window @10,564’ Window @10,583’ PB1 @11,440’ 4-1/16” OH PB1 Billet @10,710’ 2-3/8” @12,492’ PB3 @12,133’ 3” OH PB3 Billet @11,535’ ` PLUGBACK DETAIL PB1: 10,710’ MD – 11,440’ MD – Billet set @10,710’ – 4-1/16” OH PB2: 10,775’ MD – 11,886’ MD – Whipstock set @10,775’ – 3-1/4” x 2-7/8” liner to 10,982’, 4-1/16” OH PB3: 11,535’ MD – 12,133’ MD – Billet set @ 11,535’ – 3” OH SLOTTED LINER DETAIL KUP Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup A2/A3 11,340’ 12,212’ 7,092’ 7,125’ 872’ 1/18/2022 Open Kup A2 12,304’ 12,492’ 7,141’ 7,165’ 188’ 1/18/2022 Open GENERAL WELL INFO API: 50-029-22003-01-00 Drilled and Completed by Pool Rig 102 - 11/27/1990 Pull ESP, set CIBP, Run Killstring by Doyon 16 - 5/21/2012 RWO Tubing Swap: 2/19/2021 A Sidetrack Completed: 1/20/2022 Fish-Mill 1.78" x .55' (1.55" top of mill body)11,190' CTMD 4/21/22 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Cut Tubing Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Convert to ESP 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address: Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes No 9. Property Designation (Lease Number): 10. Field: Current Pools: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 12,671'N/A Casing Collapse Conductor N/A Surface 2,020psi Production 5,410psi Solid Liner 7,820psi Slotted Liner 11,780psi Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Operations Manager Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Post Initial Injection MIT Req'd? Yes No Spacing Exception Required? Yes No Subsequent Form Required: APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: AOGCC USE ONLY scott.pessetto@hilcorp.com 907-564-4373 Scott Pessetto Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): Tubing Size: 12.6# / L-80 / TXP BTC 10,472' 5/29/2023 7” x 4-1/2” Premier Production Pkr and N/A 10,356 MD/ 6,881 TVD and N/A See Schematic See Schematic 4-1/2" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025509, ADL0047434 221-011 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22003-01-00 Hilcorp Alaska LLC KUPARUK RIVER OIL N/A C.O. 432E MILNE PT UNIT L-06A Length Size Proposed Pools: TVD Burst PRESENT WELL CONDITION SUMMARY 7,174' 12,505' 7,166' 2,218 N/A MILNE POINT MD N/A 8,620psi 3,520psi 7,240psi 4,590' 7,299' 7,067' 6,314' 10,564' 10,775' Perforation Depth MD (ft): 3-1/4"345' 2,073'11,200psi7,165'12,492' 13-3/8"115' 115'115' 2-3/8" 9-5/8" 7" 6,314' 11,068' Form 10-403 Revised 10/2022 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov By Kayla Junke at 9:13 am, Apr 26, 2023 323-257 Digitally signed by David Haakinson (3533) DN: cn=David Haakinson (3533) Date: 2023.04.26 08:38:31 - 08'00' David Haakinson (3533) MGR19MAY23 MDG 4/28/2023 DSR-4/26/23 * BOPE test to 2500 psi. 2,218 10-404 * Approved for ESP packerless completion with reservoir pressure less than 8.55 PPGE. GCW 05/24/23JLC 5/24/2023 05/24/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.05.24 12:35:31 -05'00' RBDMS JSB 052523 Well: MPL-06A PTD: 221-011 API: 50-029-22003-01-00 Well Name:MPL-06A API Number:50-029-22003-01-00 Current Status:Jet Pump Producer Rig:ASR Estimated Start Date:5/29/2023 Estimated Duration:6 days Regulatory Contact:Tom Fouts Permit to Drill Number:221-011 First Call Engineer:Scott Pessetto (907) 564-4373 (O) (801) 822-2203 (M) Second Call Engineer:Taylor Wellman (907) 777-8449 (O) (907) 947-9533 (M) Current Bottom Hole Pressure: 2,902 psi @ 6,836’ TVD Gauge Sensor |8.16 PPGE Max Potential Surface Pressure: 2,218 psi Gas Column Gradient (0.1 psi/ft) Max Angle: 56° @ 10,500’ MD Prior to CTD lateral Brief Well Summary: MPL-06A is an online Kuparuk producer with a CTD lateral in the Kuparuk A2/A3 sands. A workover was completed in 2021 swapping the tubing. A CTD sidetrack was completed in 2022 after a previous failure in 2021. Later in 2022 service coil was used to pump cement to isolate potential solids from the parent bore. The well is currently online and producing. Objectives: Pull jet pump completion. Run new ESP completion for greater drawdown. Notes Regarding Wellbore Condition: - Mill stuck in lateral at 11,190’ CTMD Pre-Rig Procedure Slickline 1. RU slickline, pressure test PCE to 250psi low / 2,500psi high. 2. Pull jet pump from sleeve at 10,288’ MD. 3. Close sliding sleeve at 10,288’ MD. 4. MIT-IA to 2,500 psi for 30 minutes. 5. Open sliding sleeve at 10,288’ MD. 6. Run memory caliper from 10,356’ to surface. 7. RDMO. E-Line 1. RU E-line, pressure test PCE to 250psi low / 2,500psi high. 2. PU mechanical cutter. 3. Cut tubing 5’ below collar on first full joint above the packer at 10,310’ MD. 4. RDMO Pumping & Well Support 1. Clear and level pad area in front of well. Spot rig mats and containment. 2. RD well house and flowlines. Clear and level area around well. 3. RU Little Red Services. RU reverse out skid and 500 barrel returns tank. 4. Pressure test lines to 3,000 psi. 5. Circulate at least one wellbore volume with produced water down tubing, taking returns up casing to 500 barrel returns tank. Well: MPL-06A PTD: 221-011 API: 50-029-22003-01-00 6. Confirm well is dead. Contact operations engineer if freeze protection is needed prior to ASR arrival. 7. RD Little Red Services and reverse out skid. 8. Set BPV. ND tree. NU BOPE. Brief RWO Procedure 1. MIRU Hilcorp ASR #1 WO Rig, ancillary equipment, and lines to 500 bbl returns tank. 2. Check for pressure and if 0 psi set CTS plug. If needed, bleed off any residual pressure off tubing and casing. a. If needed, kill well with produced water prior to setting CTS. 3. Test BOPE to 250 psi low/ 2,500 psi high. Test annular to 250 psi low/ 2,500 psi high (hold each ram/valve and test for 5-min). Record accumulator pre-charge pressures and chart tests. a. Perform test per ASR 1 BOP Test Procedure b. Notify AOGCC 24 hours in advance of BOP test. c. Confirm test pressures per the Sundry conditions of approval. d. Test VBR rams on 2-7/8” and 4-1/2” test joint. e. Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 4. Bleed any pressure on casing to the returns tank. Pull CTS plug. Bleed any pressure off tubing to the returns tank. Kill well with produced water as needed. Pull BPV. a. If indications show pressure underneath BPV, lubricate out BPV. 5. MU landing joint or spear, BOLDS, PU on the tubing hanger. a. Tubing hanger is a FMC 11” x 4-1/2”, TCII top/btm with 2-3/8” ports b. Doyon 14 PUW 152k, SO 85k. (Block weight 40k) 6. Confirm hanger free, lay down tubing hanger. 7. POOH and lay down the 4-1/2” tubing. Number all joints. a. Based on caliper results, joints to be kept will be reported to rig. Trash visibly bad joints. b. Clamp Totals i. Canon Clamps: 134 ii. 1 ea on first five joints above gauge, then one every other joint. 8. Call out ESP toolhand 9. RIH with new 2-7/8” 6.5# L-80 ESP completion to +/- 10,250’ and obtain string weights. a. Check electrical continuity every 1000’. b. Confirm top of ESP is below 10,000’ MD to avoid high DLS across pump set depth. c. Note PU and SO weights on tally. d. Install ESP clamps per ESP toolhand, and cross coupling clamps every other joint e. Run single 3/8” cap string the length of the completion, clamping with cable. underneath BPV, lubricate out BPV. Well: MPL-06A PTD: 221-011 API: 50-029-22003-01-00 Nom. (OD)Length Item Lb/ft Material Notes 5.85 2 Centralizer 4 4.5 2 Intake Sensor 30 5.62 34 Motor 80 5.2 7 Lower Tandem Seal 38 5.2 7 Upper Tandem Seal 38 5.2 8 Gas Separator 52 5.38 57 Pump 45 1 Ported Discharge Head 13 L-80 2-7/8" 10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 30 2-7/8" EUE 8rd L-80 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8"2 2-7/8” XN-nipple 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 60 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8"8 2-7/8" x 1" GLM, DV installed 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" ~9,770 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8"8 2-7/8" x 1" GLM, 1/4" OV 6.5 L-80 ~200 MD 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 150 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8" 10 Space out pup 6.5 L-80 2-7/8" 30 Tubing Hanger with full joint 6.5 L-80 10. Land tubing hanger. Use extra caution to not damage cable. 11. Lay down landing joint. 12. Set BPV. 13. RDMO ASR. Post-Rig Procedure: Well Support 1. RD mud boat. RD BOPE house. Move to next well location. 2. RU crane. ND BOPE, set CTS plug, and NU tree. 3. Test tubing hanger void to 500 psi low/5,000 psi high. Pull CTS and BPV. 4. RD crane. Move 500 bbl returns tank and rig mats to next well location. 5. RU well house and flowlines. Approved to produce with packerless completion per CO390A Allows ESP packerless completions for BHP less than 8.55 ppg equivalent fluid gradient #8 Findings: Packerless ESP completions (Kuparuk Oil Pool) have multiple casing strings w/ monitorable annulus at the surface shoe OA #12 Findings: Hilcorp voluntarily agreed by letter to manage reservoir pressures to seawater gradient equivalent of 8.55 ppg CO390A requires packers on ESP completions where BHP > 8.55 ppg equivalent fluid gradient - mgr Well: MPL-06A PTD: 221-011 API: 50-029-22003-01-00 Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 3. BOPE Schematic _____________________________________________________________________________________ Revised By: TDF 8/23/2022 SCHEMATIC Milne Point Unit Well: MPU L-06A Last Completed: 2/19/2021 PTD: 221-011 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8" Conductor 48# / H-40 / Weld 12.715 Surface 115' 0.157 9-5/8" Surface 36# / J-55 / BTC 8.921 Surface 6,314’ 0.0773 7" Production 26# / L-80 / BTC 6.276 Surface 10,564’ 0.0383 3-1/4” Solid Liner 6.6 # / L-80 / TCII 2.850 10,430’ 10,775’ 2-3/8” Solid/ Slotted Liner 4.7# / L-80 / Hyd 511 1.995 10,425’ 12,492’ TUBING DETAIL 4-1/2” Tubing 12.6# / L-80 / TXP BTC 3.92 Surface 10,472’ 0.0152 JEWELRY DETAIL No Depth Item 1 31’ 4-1/2” Tubing Hanger 2 10,280’ Gauge Carrier 3 10,288’ HES X-line Sliding Sleeve, 3.813” Seal Bore ID 4 10,296’ Ported Pressure Sub 5 10,356’ 7” x 4-1/2” Premier Production Packer 6 10,425’ X Nipple, 3.813” 7 10,434’ WELG, bottom at 10,472’ 8 10,564’ 1 st Whipstock 9 10,775’ 2 nd Whipstock OPEN HOLE / CEMENT DETAIL 30" 485 sks Permafrost ‘C’ 12-1/4" 1469 sx Permafrost ‘E’, 410 sx Class ‘G’ 8-1/2” 328 sx Class ‘G’ 4-1/16” Uncemented Solid Liner 3” Uncemented Solid / Slotted Liner WELL INCLINATION DETAIL KOP @ 700’ Max Hole Angle = 100° @ 11,390’ A Top of Window @ 10,564’ TREE & WELLHEAD Tree 4-1/16” 5K CIW (dry hole) Wellhead FMC 11"x 4-1/2" Hanger, 4.5" TCII top/btm w/ 2- 3/8'' ports TD = 12,671’ (MD) / TD =7,174’(TVD) Halliburton HOS Cementer at 1,881’ Orig. KB Elev. = 56.0’ Ground Elev. = 21.0’ RKB-THF: 23.95’ (Doyon 16) 3 8 5 7 Cement Retainer @12,505’, 3” OH to TD Est.TOC at 8,820’ 9-5/8” Top of 3-1/4” Liner @ 10,430’ Est. TOC at 2,000’ 6 PBTD =12,505’(MD) / PBTD=7,166’(TVD) 3-1/2”XO 2-7/8” @10,952’ 2-7/8” @10,982’ 9 RA Tag at 10,304’ Arctic Pack Baker Flow Guard Liner Top Packer 10,419’ Top of Window @10,775’ Failed Whipstock @10,583’ Top of 2-3/8” Liner @ 10,425’ 4 2 1 PB2 @11,886’ 4-1/16” OH Top of Window @10,564’ Window @10,583’ PB1 @11,440’ 4-1/16” OH PB1 Billet @10,710’ 2-3/8” @12,492’ PB3 @12,133’ 3” OH PB3 Billet @11,535’ ` PLUGBACK DETAIL PB1: 10,710’ MD – 11,440’ MD – Billet set @10,710’ – 4-1/16” OH PB2: 10,775’ MD – 11,886’ MD – Whipstock set @10,775’ – 3-1/4” x 2-7/8” liner to 10,982’, 4-1/16” OH PB3: 11,535’ MD – 12,133’ MD – Billet set @ 11,535’ – 3” OH SLOTTED LINER DETAIL KUP Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup A2/A3 11,340’ 12,212’ 7,092’ 7,125’ 872’ 1/18/2022 Open Kup A2 12,304’ 12,492’ 7,141’ 7,165’ 188’ 1/18/2022 Open GENERAL WELL INFO API: 50-029-22003-01-00 Drilled and Completed by Pool Rig 102 - 11/27/1990 Pull ESP, set CIBP, Run Killstring by Doyon 16 - 5/21/2012 RWO Tubing Swap: 2/19/2021 A Sidetrack Completed: 1/20/2022 Fish-Mill 1.78" x .55' (1.55" top of mill body)11,190' CTMD 4/21/22 _____________________________________________________________________________________ Revised By: TDF 4/26/2023 PROPOSED Milne Point Unit Well: MPU L-06A Last Completed: 2/19/2021 PTD: 221-011 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8" Conductor 48# / H-40 / Weld 12.715 Surface 115' 0.157 9-5/8" Surface 36# / J-55 / BTC 8.921 Surface 6,314’ 0.0773 7" Production 26# / L-80 / BTC 6.276 Surface 10,564’ 0.0383 3-1/4” Solid Liner 6.6 # / L-80 / TCII 2.850 10,430’ 10,775’ 2-3/8” Solid/ Slotted Liner 4.7# / L-80 / Hyd 511 1.995 10,425’ 12,492’ TUBING DETAIL 4-1/2” Tubing 12.6# / L-80 / TXP BTC 3.958 ±10,310’10,472’ 0.0152 2-7/8” Tubing 6.5# / L-80 / EUE 8rd 2.441 Surface ±10,256 0.0058 JEWELRY DETAIL No Depth Item 1 ±200’ 2-7/8" x 1" GLM, 1/4" OV 2 ±9,998’ 2-7/8" x 1" GLM, DV installed 3 ±10,086’ 2-7/8” XN-nipple – 2.313 ID 4 ±10,138’ Ported Discharge Head: 5 ±10,139’ Pump: 6 ±10,196’ Gas Separator: 7 ±10,204’ Upper Tandem Seal: 8 ±10,211’ Lower Tandem Seal: 9 ±10,218’ Motor: 10 ±10,252’ Intake Sensor w/ Centralizer -Btm @ ±10,256’ 11 10,356’ 7” x 4-1/2” Premier Production Packer 12 10,425’ X Nipple, 3.813” 13 10,434’ WELG, bottom at 10,472’ 14 10,564’ 1st Whipstock 15 10,775’ 2nd Whipstock OPEN HOLE / CEMENT DETAIL 30" 485 sks Permafrost ‘C’ 12-1/4" 1469 sx Permafrost ‘E’, 410 sx Class ‘G’ 8-1/2” 328 sx Class ‘G’ 4-1/16” Uncemented Solid Liner 3” Uncemented Solid / Slotted Liner WELL INCLINATION DETAIL KOP @ 700’ Max Hole Angle = 100° @ 11,390’ A Top of Window @ 10,564’ TREE & WELLHEAD Tree 4-1/16” 5K CIW (dry hole) Wellhead FMC 11"x 4-1/2" Hanger, 4.5" TCII top/btm w/ 2- 3/8'' ports TD =12,671’(MD) / TD =7,174’(TVD) Halliburton HOS Cementer at 1,881’ Orig. KB Elev. = 56.0’ Ground Elev. = 21.0’ RKB-THF: 23.95’ (Doyon 16) 3 14 11 13 Cement Retainer @12,505’, 3” OH to TD Est. TOC at 8,820’ 9-5/8” Top of 3-1/4” Liner @ 10,430’ Est. TOC at 2,000’ 12 PBTD =12,505’(MD) / PBTD=7,166’(TVD) 3-1/2”XO 2-7/8” @10,952’ 2-7/8” @10,982’ 15 RA Tag at 10,304’ Arctic Pack Baker Flow Guard Liner Top Packer 10,419’ Top of Window @10,775’ Failed Whipstock @10,583’ Top of 2-3/8” Liner @ 10,425’ 4 2 1 PB2 @11,886’ 4-1/16” OH Top of Window @10,564’ Window @10,583’ PB1 @11,440’ 4-1/16” OH PB1 Billet @10,710’ 2-3/8” @12,492’ PB3 @12,133’ 3” OH PB3 Billet @11,535’ Tubing Cut @ ±10,310’ 5 6 7 & 8 9 10 ` PLUGBACK DETAIL PB1: 10,710’ MD – 11,440’ MD – Billet set @10,710’ – 4-1/16” OH PB2: 10,775’ MD – 11,886’ MD – Whipstock set @10,775’ – 3-1/4” x 2-7/8” liner to 10,982’, 4-1/16” OH PB3: 11,535’ MD – 12,133’ MD – Billet set @ 11,535’ – 3” OH SLOTTED LINER DETAIL KUP Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup A2/A3 11,340’ 12,212’ 7,092’ 7,125’ 872’ 1/18/2022 Open Kup A2 12,304’ 12,492’ 7,141’ 7,165’ 188’ 1/18/2022 Open GENERAL WELL INFO API: 50-029-22003-01-00 Drilled and Completed by Pool Rig 102 - 11/27/1990 Pull ESP, set CIBP, Run Killstring by Doyon 16 - 5/21/2012 RWO Tubing Swap: 2/19/2021 A Sidetrack Completed: 1/20/2022Fish-Mill 1.78" x .55' (1.55" top of mill body)11,190' CTMD 4/21/22 Updated 8/11/2020 Milne Point ASR Rig 1 BOPE 2022 11” BOPE 4.48' 4.54' 2.00' CIW-U 4.30'Hydril GK 11" - 5000 VBR or Pipe Rams Blind11'’- 5000 DSA, 11 5M X 7 1/16 5M (If Needed) 2 1/16 5M Kill Line Valves 2 1/16 5M Choke Line Valves HCRManualManualHCR Stripping Head 2-7/8” x 5” VBR DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22003-01-00Well Name/No.MILNE PT UNIT L-06ACompletion Status1-OILCompletion Date1/20/2022Permit to Drill2210110OperatorHilcorp Alaska, LLCMD12671TVD7174Current Status1-OIL8/19/2022UICNoWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:MWD/GR/RES mainbore + 3 plugbacksNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScale0 0 Replaced with renamed data in T36340.35301LogLog Header ScansDF6/30/202110200 11440 Electronic Data Set, Filename: MPU L-06APB1 GAMMA RES.las35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 2MD Final Log.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 2TVDSS Final Log.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 5MD Final Log.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 5TVDSS Final Log.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 01 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 02 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 03 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 04 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 05 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 06 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 07 PWD.cgm35302EDDigital DataFriday, August 19, 2022AOGCC Page 1 of 12PB1PB2PB3MPU L-06APB1 GAMMA RES.las DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22003-01-00Well Name/No.MILNE PT UNIT L-06ACompletion Status1-OILCompletion Date1/20/2022Permit to Drill2210110OperatorHilcorp Alaska, LLCMD12671TVD7174Current Status1-OIL8/19/2022UICNoDF6/30/2021 Electronic File: MPU L-06APB1 Run 08 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 09 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 10 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 11 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 12 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 13 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 14 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 15 PWD.cgm35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 GAMMA RES.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 01.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 02.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 03.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 04.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 05.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 06.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 07.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 08.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 09.ASC35302EDDigital DataFriday, August 19, 2022AOGCC Page 2 of 12 DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22003-01-00Well Name/No.MILNE PT UNIT L-06ACompletion Status1-OILCompletion Date1/20/2022Permit to Drill2210110OperatorHilcorp Alaska, LLCMD12671TVD7174Current Status1-OIL8/19/2022UICNoDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 10.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 11.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 12.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 13.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 14.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1_PWD Log Run 15.ASC35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 2MD Final.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 2TVDSS Final.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 5MD Final.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 5TVDSS Final.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 01 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 02 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 03 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 04 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 05 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 06 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 07 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 08 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 09 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 10 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 11 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 12 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 13 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 14 PWD.pdf35302EDDigital DataFriday, August 19, 2022AOGCC Page 3 of 12 DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22003-01-00Well Name/No.MILNE PT UNIT L-06ACompletion Status1-OILCompletion Date1/20/2022Permit to Drill2210110OperatorHilcorp Alaska, LLCMD12671TVD7174Current Status1-OIL8/19/2022UICNoDF6/30/2021 Electronic File: MPU L-06APB1 Run 15 PWD.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Survey Listing.txt35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Surveys.txt35302EDDigital DataDF6/30/2021 Electronic File: MPU_L-06APB1_Definitive Surveys.pdf35302EDDigital DataDF6/30/2021 Electronic File: MPU_L-06APB1_Definitive Surveys.xlsx35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 2MD Final Log.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 2TVDSS Final Log.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 5MD Final Log.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 5TVDSS Final Log.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 01 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 02 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 03 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 04 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 05 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 06 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 07 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 08 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 09 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 10 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 11 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 12 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 13 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 14 PWD.tif35302EDDigital DataDF6/30/2021 Electronic File: MPU L-06APB1 Run 15 PWD.tif35302EDDigital Data0 0 2210110 MILNE PT UNIT L-06A LOG HEADERS35302LogLog Header ScansDF2/15/202210304 12671 Electronic Data Set, Filename: MPU L-06A DEPTH.las36339EDDigital DataFriday, August 19, 2022AOGCC Page 4 of 12MPU L-06ADEPTH.las DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22003-01-00Well Name/No.MILNE PT UNIT L-06ACompletion Status1-OILCompletion Date1/20/2022Permit to Drill2210110OperatorHilcorp Alaska, LLCMD12671TVD7174Current Status1-OIL8/19/2022UICNoDF2/15/2022################Electronic Data Set, Filename: MPU L-06A PWD Log Run 02.las36339EDDigital DataDF2/15/2022################Electronic Data Set, Filename: MPU L-06A PWD Log Run 03.las36339EDDigital DataDF2/15/2022################Electronic Data Set, Filename: MPU L-06A PWD Log Run 04.las36339EDDigital DataDF2/15/2022################Electronic Data Set, Filename: MPU L-06A PWD Log Run 05.las36339EDDigital DataDF2/15/2022################Electronic Data Set, Filename: MPU L-06A PWD Log Run 06.las36339EDDigital DataDF2/15/2022################Electronic Data Set, Filename: MPU L-06A PWD Log Run 07.las36339EDDigital DataDF2/15/2022################Electronic Data Set, Filename: MPU L-06A PWD Log Run 08.las36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A 2MD Final Log.cgm36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A 2TVDSS Final Log.cgm36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A 5MD Final Log.cgm36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A 5TVDSS Final Log.cgm36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 02 PWD.cgm36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 02 PWD.cgm.meta36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 03 PWD.cgm36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 03 PWD.cgm.meta36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 04 PWD.cgm36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 04 PWD.cgm.meta36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 05 PWD.cgm36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 05 PWD.cgm.meta36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 06 PWD.cgm36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 06 PWD.cgm.meta36339EDDigital DataFriday, August 19, 2022AOGCC Page 5 of 12 DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22003-01-00Well Name/No.MILNE PT UNIT L-06ACompletion Status1-OILCompletion Date1/20/2022Permit to Drill2210110OperatorHilcorp Alaska, LLCMD12671TVD7174Current Status1-OIL8/19/2022UICNoDF2/15/2022 Electronic File: MPU L-06A Run 07 PWD.cgm36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 07 PWD.cgm.meta36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 08 PWD.cgm36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 08 PWD.cgm.meta36339EDDigital DataDF2/15/2022 Electronic File: wellname Run xx PWD.cgm36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A DEPTH.ASC36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A PWD Log Run 02.ASC36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A PWD Log Run 03.ASC36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A PWD Log Run 04.ASC36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A PWD Log Run 05.ASC36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A PWD Log Run 06.ASC36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A PWD Log Run 07.ASC36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A PWD Log Run 08.ASC36339EDDigital DataDF2/15/2022 Electronic File: MPU_L-06A_Definitive Surveys.pdf36339EDDigital DataDF2/15/2022 Electronic File: MPU_L-06A_Definitive Surveys.xlsx36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A 2MD Final Log.PDF36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A 2TVDSS Final Log.pdf36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A 5MD Final Log.PDF36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A 5TVDSS Final Log.PDF36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 2 PWD.pdf36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 3 PWD.pdf36339EDDigital DataFriday, August 19, 2022AOGCC Page 6 of 12 DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22003-01-00Well Name/No.MILNE PT UNIT L-06ACompletion Status1-OILCompletion Date1/20/2022Permit to Drill2210110OperatorHilcorp Alaska, LLCMD12671TVD7174Current Status1-OIL8/19/2022UICNoDF2/15/2022 Electronic File: MPU L-06A Run 4 PWD.pdf36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 5 PWD.pdf36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 6 PWD.pdf36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 7 PWD.pdf36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 8 PWD.pdf36339EDDigital DataDF2/15/2022 Electronic File: wellname Run xx PWD.pdf36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A 2MD Final Log.tif36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A 2TVDSS Final Log.tif36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A 5MD Final Log.tif36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A 5TVDSS Final Log.tif36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 02 PWD.tif36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 03 PWD.tif36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 04 PWD.tif36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 05 PWD.tif36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 06 PWD.tif36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 07 PWD.tif36339EDDigital DataDF2/15/2022 Electronic File: MPU L-06A Run 08 PWD.tif36339EDDigital DataDF2/15/2022 Electronic File: wellname Run xx PWD.tif36339EDDigital Data0 0 2210110 MILNE PT UNIT L-06A LOG HEADERS36339LogLog Header ScansDF2/17/2022 Electronic File: MPU L-06A 2MD Final Log.cgm36339EDDigital DataDF2/17/2022 Electronic File: MPU L-06A 2TVDSS Final Log.cgm36339EDDigital DataDF2/17/2022 Electronic File: MPU L-06A 5MD Final Log.cgm36339EDDigital DataDF2/17/2022 Electronic File: MPU L-06A 5TVDSS Final Log.cgm36339EDDigital DataDF2/17/2022 Electronic File: MPU L-06A 2MD Final Log.PDF36339EDDigital DataDF2/17/2022 Electronic File: MPU L-06A 2TVDSS Final Log.pdf36339EDDigital DataDF2/17/2022 Electronic File: MPU L-06A 5MD Final Log.PDF36339EDDigital DataFriday, August 19, 2022AOGCC Page 7 of 12 DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22003-01-00Well Name/No.MILNE PT UNIT L-06ACompletion Status1-OILCompletion Date1/20/2022Permit to Drill2210110OperatorHilcorp Alaska, LLCMD12671TVD7174Current Status1-OIL8/19/2022UICNoDF2/17/2022 Electronic File: MPU L-06A 5TVDSS Final Log.PDF36339EDDigital DataDF2/17/2022 Electronic File: MPU L-06A 2MD Final Log.tif36339EDDigital DataDF2/17/2022 Electronic File: MPU L-06A 2TVDSS Final Log.tif36339EDDigital DataDF2/17/2022 Electronic File: MPU L-06A 5MD Final Log.tif36339EDDigital DataDF2/17/2022 Electronic File: MPU L-06A 5TVDSS Final Log.tif36339EDDigital Data0 0 2210110 MILNE PT UNIT L-06A PB2 LOG HEADERS36340LogLog Header ScansDF2/15/202210200 11886 Electronic Data Set, Filename: MPU L-06APB2 GAMMA RES.las36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 2MD Final Log.cgm36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 2TVDSS Final Log.cgm36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 5MD Final Log.cgm36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 5TVDSS Final Log.cgm36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 Run 16 PWD.cgm36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 Run 17 PWD.cgm36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 Run 18 PWD.cgm36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 GAMMA RES.ASC36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2_PWD Log Run 16.ASC36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2_PWD Log Run 17.ASC36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2_PWD Log Run 18.ASC36340EDDigital DataDF2/15/2022 Electronic File: MPU_L-06APB2_Definitive Surveys.pdf36340EDDigital DataFriday, August 19, 2022AOGCC Page 8 of 12MPU L-06APB2 GAMMA RES.las DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22003-01-00Well Name/No.MILNE PT UNIT L-06ACompletion Status1-OILCompletion Date1/20/2022Permit to Drill2210110OperatorHilcorp Alaska, LLCMD12671TVD7174Current Status1-OIL8/19/2022UICNoDF2/15/2022 Electronic File: MPU_L-06APB2_Definitive Surveys.xlsx36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 2MD Final Log.PDF36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 2TVDSS Final Log.PDF36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 5MD Final Log.PDF36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 5TVDSS Final Log.PDF36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 Run 16 PWD.pdf36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 Run 17 PWD.pdf36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 Run 18 PWD.pdf36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 2MD Final Log.tif36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 2TVDSS Final Log.tif36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 5MD Final Log.tif36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 5TVDSS Final Log.tif36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 Run 16 PWD.tif36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 Run 17 PWD.tif36340EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB2 Run 18 PWD.tif36340EDDigital DataDF2/15/202210304 12134 Electronic Data Set, Filename: L-06APB3 GAMMA RES.las36341EDDigital DataDF2/15/2022################Electronic Data Set, Filename: MPU L-06APB3_PWD Log Run 02.las36341EDDigital DataDF2/15/2022################Electronic Data Set, Filename: MPU L-06APB3_PWD Log Run 03.las36341EDDigital DataDF2/15/2022################Electronic Data Set, Filename: MPU L-06APB3_PWD Log Run 04.las36341EDDigital DataDF2/15/2022################Electronic Data Set, Filename: MPU L-06APB3_PWD Log Run 05.las36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 2MD Final Log.cgm36341EDDigital DataFriday, August 19, 2022AOGCC Page 9 of 12L-06APB3GAMMA RES.las DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22003-01-00Well Name/No.MILNE PT UNIT L-06ACompletion Status1-OILCompletion Date1/20/2022Permit to Drill2210110OperatorHilcorp Alaska, LLCMD12671TVD7174Current Status1-OIL8/19/2022UICNoDF2/15/2022 Electronic File: MPU L-06APB3 2TVDSS Final Log.cgm36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 5MD Final Log.cgm36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 5TVDSS Final Log.cgm36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 Run 02 PWD.cgm36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 Run 03 PWD.cgm36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 Run 04 PWD.cgm36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 Run 05 PWD.cgm36341EDDigital DataDF2/15/2022 Electronic File: L-06APB3 GAMMA RES.ASC36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3_PWD Log Run 02.ASC36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3_PWD Log Run 03.ASC36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3_PWD Log Run 04.ASC36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3_PWD Log Run 05.ASC36341EDDigital DataDF2/15/2022 Electronic File: MPU_L-06APB3_Definitive Surveys.pdf36341EDDigital DataDF2/15/2022 Electronic File: MPU_L-06APB3_Definitive Surveys.xlsx36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 2MD Final Log.PDF36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 2TVDSS Final Log.PDF36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 5MD Final Log.PDF36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 5TVDSS Final Log.PDF36341EDDigital DataFriday, August 19, 2022AOGCC Page 10 of 12 DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22003-01-00Well Name/No.MILNE PT UNIT L-06ACompletion Status1-OILCompletion Date1/20/2022Permit to Drill2210110OperatorHilcorp Alaska, LLCMD12671TVD7174Current Status1-OIL8/19/2022UICNoWell Cores/Samples Information:ReceivedStart Stop CommentsTotalBoxesSample SetNumberNameIntervalINFORMATION RECEIVEDCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYMud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYDF2/15/2022 Electronic File: MPU L-06APB3 Run 02 PWD.PDF36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 Run 03 PWD.PDF36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 Run 04 PWD.PDF36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 Run 05 PWD.PDF36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 2MD Final Log.tif36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 2TVDSS Final Log.tif36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 5MD Final Log.tif36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 5TVDSS Final Log.tif36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 Run 02 PWD.tif36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 Run 03 PWD.tif36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 Run 04 PWD.tif36341EDDigital DataDF2/15/2022 Electronic File: MPU L-06APB3 Run 05 PWD.tif36341EDDigital Data0 0 2210110 MILNE PT UNIT L-06A PB3 LOG HEADERS36341LogLog Header ScansFriday, August 19, 2022AOGCC Page 11 of 12 DATA SUBMITTAL COMPLIANCE REPORTAPI No.50-029-22003-01-00Well Name/No.MILNE PT UNIT L-06ACompletion Status1-OILCompletion Date1/20/2022Permit to Drill2210110OperatorHilcorp Alaska, LLCMD12671TVD7174Current Status1-OIL8/19/2022UICNoComments:Compliance Reviewed By:Date:Date CommentsDescriptionCompletion Date:1/20/2022Release Date:1/27/2021Friday, August 19, 2022AOGCC Page 12 of 12M.Guhl8/19/2022 By Samantha Carlisle at 2:18 pm, Aug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y Samantha Carlisle at 10:48 am, Mar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ƒ52+6 DWISP5DWHLQESP5DWHRXWESP&LUFXODWLQJSUHVVXUHSVLWRSVL0:LQSSJ0:RXWSSJ:LQGRZ(&'SSJ:2% NWRN%DFNUHDPƒOHIWRIDVPLOOHG%DFNUHDPƒULJKWRIDVPLOOHG5DWHLQESP5DWHRXWESP&LUFXODWLQJSUHVVXUHSVLWRSVL0:LQ SSJ0:RXWSSJ:LQGRZ(&'SSJ:2%N2YHUSXOORQODVWƒ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a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ƒ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ƒEHQGPRWRU5,+/RJWLHLQZKLOHGLVSODFLQJFRLOWRGULOOLQJPXG FRUUHFWLRQGLVSODFHZHOOWRPXG:HOOGLVSODFH FORVHWKH('&DQG5,+WRWDJDQGVWDUWGULOOLQJEXLOG2QERWWRPGULOOLQJDW 38:7 N)UHH6SLQ%30DWSVL:2% ,Q5DWH ESP 2XW5DWH ESP0:,Q SSJ0:2XW SSJ(&' ,$3 SVL2$3 SVL$W DYJƒ'/6'ULOODKHDGIURP :2% N,Q5DWH ESP2XW5DWH ESP0:,Q SSJ0:2XWSSJ(&' ,$3 2$3 SVL$YHUDJHƒ'/6/DQGEXLOG VHFWLRQDW 3XPSEEO+L/RYLVVZHHS'LVSODFHFRLODQGZHOOWRSSJ.:)DQGOD\LIIURP NRYHUSXOOQRWHGSXOOLQJWKURXJKZLQGRZDWESP $W 2SHQ('&DQGILQLVKGLVSODFHPHQWWR.:)322+WRVXUIDFH,10: SSJ2870: SSJ22+/'%XLOG%+$ELWJUDGH08DQG5,+ ZLWKODWHUDO%+$ZLWKƒPRWRU5,+ZLWK/DWHUDO%+$ZLWKƒPRWRUDQGUHUXQ+\FDORJELFHQWHUELW%HJLQGLVSODFLQJWRSSJGULOOLQJV\VWHP/RJWLH LQSDVVDW &RUUHFW 5,+WRULJKWDERYHZLQGRZDQGILQLVKGLVSODFLQJWRSSJGULOOLQJV\VWHP$WERWWRPXSSSP+6QRWHG'LYHUWEEOV RXWVLGH&RQWLQXHGLVSODFLQJWRSSJGULOOLQJV\VWHP&ORVH('&DQGORJ&&/SDVVIURP WR   &&/ORJIURP WR &ORVH('&DQG5,+WDJDW 7U\VHWWLQJGRZQOLJKWZHLJKWDQGRULHQWƒ/ 5QRJR38 RQOLQHZLWKSXPSDWESP 5,+WDJDJDLQZLWKSVLGLIISUHVVXUH6KXWGRZQSXPS38DQGRULHQWWRƒ52+6WDJRULHQWWRƒ/2+6WDJ2ULHQWWRƒWDJ1RWDEOHWRJHWSDVWWKH 72:6322+IRU7DSHUHG 6WULQJ0LOOV22+VSDFHRXWVKXWGRZQSXPSWUDSSLQJSVL:+3/LQHXSRQ03/WRPDLQWDLQSVL:+3 (&' DWWKH ZLQGRZ6WDUWSUHVVXUHXQGHSOR\FKHFNOLVW&DQ WJHWDWHVWRQWKH476IRXQGWKH1R*R3ODWHLVWRRWKLFNDQGLVFRYHULQJWKHWHVWSRUW37WKHFRQQHFWLRQZLWKWKH PXGSXPSEHORZ*RRG37FRQWLQXHXQGHSOR\LQJWKH%+$%+$22+IRXQGRIWKHZDWHUFRXUVHVRQWKHSLORWPLOORIWKHELWSDFNHGRIZLWKIRUPDWLRQ38WKH PLOOLQJFOHDQRXW%+$DQGSUHVVXUHGHSOR\%+$GHSOR\HG5,+ZLWKVWUDLJKWPRWRUDQGPLOOV7LHLQ FRUUHFWLRQFORVHWKH('&8S:7 N5,+DWPLQUDWH PDGHLWWRWKHERWWRPRIWKHZLQGRZ38DERYHWKH:6DQGEULQJSXPSRQDWIXOOUDWH5,+VORZPDGHLWGRZQWR DQGVWDUWHGVWDFNLQJ:738+VORZWRWKH 775,+DQGUHDPDFURVV:67UD\'U\GULIWWKURXJKZLQGRZIURP  ZLWKRXWDQ\VHWGRZQ38+DQGSXPSESPXSDQGGRZQWKURXJKVHFWLRQ 3XPSILQDOKLORVZHHSRIIERWWRP322+,QUDWH ESP2XWUDWH ESP00LQ SSJ00RXW SSJ5HYHUVHMRJDW 0HWDO VKDYLQJVSLHFHVQRWHGDWVKDNHURQERWWRPVXS5HWXUQ00DSSHDUHGWREHSOXJJLQJ%ORZRXWDWVXUIDFH22+3-60DQGSUHSDUHWRSUHVVXUHXQGHSOR\6WDUW SUHVVXUHXQGHSOR\FKHFNOLVWIRUFOHDQRXW%+$$OOQR]]OHVRQPLOOFOHDU3UHVVXUHGHSOR\%+$/DWHUDO%+$ZLWKGHJUHHEHQGDQG+\FELFHQWHU ELW5,+ZLWKODWHUDO%+$/DWHUDO%+$ZLWKGHJUHHPRWRUEHQGDQG+\FELFHQWHUELW0:,Q SSJ0:2XW SSJ(&'SSJ5DWH ,Q ESP5DWH2XW ESP/RJWLHLQSDVVIURP &RUUHFW &RQW5,+WRZLQGRZ&ORVH('&:7&.DW  N7DJDW DWGULOOLQJUDWH 'URSWRPLQUDWHDQGDWWHPSWWR5,+WRERWWRP,QUDWHESP2XWUDWHESP0:LQ SSJ0:RXW SSJ(&' SSJ$WWHPSWLQJWRUXQSDVW  WR   &RQWLQXH5,+WR7'DW DWPLQUDWH7DNLQJ:7DW  VWDUWRIWKHEXLOGZLWKƒ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ƒ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a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ƒ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a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a%3+ORVVUDWH 322+WR WRSDLQWDIODJIRUWKH3URWHFWLRQ6WULQJWKHQFRQWLQXH322+22+IORZFKHFNZHOOJRRGQRIORZ38LQMHFWRUDQG/'WKH %+$%+$22+SUHSWRUHVW3DFNRIIWKDWVDZSUHVVXUHZKLOHPRQLWRULQJWKHZHOO3DFNRIIWHVWHGWRSVLORZDQGSVLKLJK3UHSULJIORRUWRUXQSURWHFWLRQVWULQJ 083URWHFWLRQ6WULQJDVSHUVXPPDU\3URWHFWLRQVWULQJ085,+6WRSDWWKH)ODJ%27'HSWK (23 &RUUHFWGHSWK WR DQG 5,+38:7 N5,+WDJDW WKHQ WDJ[a RIIERWWRP38NDQGEULQJSXPSRQOLQHWRMHWGRZQ1RWPDNLQJDQ\KHDGZD\SXPSRIIWKHOLQHU DQG38+WRWLHLQNXS:7ORRNVOLNHZHDUHRIIWKHOLQHU38+WRORJWLHLQSXPSLQJDWESPMXVWLQFDVHZHDUHVWLOORQWKHOLQHU&RUUHFWGHSWK WR OLQHULVRQERWWRP5,+WR MXVWDERYHWKH72/DQGGLVSODFHWKHSSJ%ULQHRXWZLWK.&O5HPRYHWKHOLQHUOHQJWKIURPWKH%+$IRU7RP.DWWRUHDG SURSHU(&' VIRUWKLVGHSWK6ZDSZHOOWR.&OIURP DERYHOLQHUWRS:LWKEEOV.&ORXWVWDUW322+.HHS(&'ZKLOH322+$W VZDSWRIUHH]H SURWHFWIOXLG&KDVH)3ZLWK.&OZDWHUOD\LQ)3WRVXUIDFH7DJVWULSSHUXQGHSOR\%+$5HPRYH%+,84&,QVWDOOERRWRQFDEOH0DNHXSQR]]OHDQGJHW RQZHOO3XPSEEOVIUHVKZDWHUEEOVLQKLELWRUEEOV0H2+IROORZHGE\1SXUJH$OORZ1WREOHHGRIIWRWLJHUWDQN3XUJHVXUIDFHOLQHVZLWKDLU6WDUW 5'02FKHFNOLVWV  &RQWLQXHZLWK5'022SV&XWRII&7&DQGERRWHOLQH5HPRYH5HHO,URQDQG3UHVVXUH%XONKHDG,QVWDOO*UDSSOHWRXQVWDEFRLO8QVWDEFRLODQGVHFXUHDWWKH UHHO2IIORDG5HHO&RQWLQXHZLWK5'022SVDQGVZDSWR5:2FRQILJXUDWLRQ5LJGRZQDQGGLVDVVHPEOHERWK3'/V5HPRYHK\GUDXOLFKRVHVDQGZLQFKIURP 3'/V5'FKRNHDQGNLOOOLQH03'OLQH,QVWDOOFDSRQ03'OLQH%OHHG.RRPH\DQGUHPRYHK\GUDXOLFKRVHVIURP%23V5HPRYH%23VIURPWUHH3XUJHZDWHUDQG VWHDPOLQHVZLWKDLU5'LQWHUFRQQHFWLRQDUHDKRVHV&RQWLQXHZLWK5'02FKHFNOLVWV5LJ5HOHDVHGDW BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB ZĞǀŝƐĞĚLJ͗:E>ϯͬϭϬͬϮϬϮϮ ^,Dd/ DŝůŶĞWŽŝŶƚhŶŝƚ tĞůů͗DWh>ͲϬϲʹ ZEDWϮ >ĂƐƚŽŵƉůĞƚĞĚ͗ϮͬϭϵͬϮϬϮϭ Wd͗ϮϮϭͲϬϭϭ 63(&,$/127( 7KLVVFKHPDWLFGHSLFWVWKHZHOOERUHFRQILJXUDWLRQDWWKHWLPHRI 2SHUDWLRQV6KXWGRZQRQ7KLVZHOOERUHZDVODWHUSOXJJHG EDFNZLWKDZKLSVWRFNVHWDW¶LQWKH´OLQHUDQG DEDQGRQHGSULRUWRIXUWKHUGULOOLQJRSHUDWLRQV)RUFODULW\LWZDV UHQDPHGWR3% 'EZ>t>>/E&K W/͗ϱϬͲϬϮϵͲϮϮϬϬϯͲϬϭͲϬϬ ƌŝůůĞĚĂŶĚŽŵƉůĞƚĞĚďLJWŽŽůZŝŐϭϬϮͲϭϭͬϮϳͬϭϵϵϬ WƵůů^W͕ƐĞƚ/W͕ZƵŶ<ŝůůƐƚƌŝŶŐďLJŽLJŽŶϭϲͲϱͬϮϭͬϮϬϭϮ ZtKdƵďŝŶŐ^ǁĂƉ͗ϮͬϭϵͬϮϬϮϭ ^ŝĚĞƚƌĂĐŬKƉĞƌĂƚŝŽŶƐ^ŚƵƚĚŽǁŶ͗ϲͬϭϮͬϮϬϮϭ ^/E'd/> ^ŝnjĞ dLJƉĞ tƚͬ'ƌĂĚĞͬŽŶŶ / dŽƉ ƚŵ W& ϭϯͲϯͬϴΗ ŽŶĚƵĐƚŽƌ ϰϴηͬ,ͲϰϬͬtĞůĚ ϭϮ͘ϳϭϱ ^ƵƌĨĂĐĞ ϭϭϱΖ Ϭ͘ϭϱϳ ϵͲϱͬϴΗ ^ƵƌĨĂĐĞ ϯϲηͬ:Ͳϱϱͬd ϴ͘ϵϮϭ ^ƵƌĨĂĐĞ ϲ͕ϯϭϰ͛ Ϭ͘Ϭϳϳϯ ϳΗ WƌŽĚƵĐƚŝŽŶ Ϯϲηͬ>ͲϴϬͬd ϲ͘Ϯϳϲ ^ƵƌĨĂĐĞ ϭϬ͕ϱϲϰ͛ Ϭ͘Ϭϯϴϯ ϯͲϭͬϰ͟ ^ŽůŝĚ>ŝŶĞƌ ϲ͘ϲηͬ>ͲϴϬͬd// ϭϬ͕ϰϯϬ͛ ϭϬ͕ϵϱϮ͛ ϮͲϳͬϴ͟ ^ŽůŝĚ>ŝŶĞƌ ϲ͘ϱηͬ>ͲϴϬͬ^dͲ> ϭϬ͕ϵϱϮ͛ ϭϬ͕ϵϴϮ͛ dh/E'd/> ϰͲϭͬϮ͟ dƵďŝŶŐ ϭϮ͘ϲηͬ>ͲϴϬͬdyWd ϯ͘ϵϮ ^ƵƌĨĂĐĞ ϭϬ͕ϰϳϮ͛ Ϭ͘ϬϭϱϮ :t>Zzd/> EŽ ĞƉƚŚ /ƚĞŵ ϭ ϯϭ͛ ϰͲϭͬϮ͟dƵďŝŶŐ,ĂŶŐĞƌ Ϯ ϭϬ͕ϮϴϬ͛ 'ĂƵŐĞĂƌƌŝĞƌ ϯ ϭϬ͕Ϯϴϴ͛ ,^yͲůŝŶĞ^ůŝĚŝŶŐ^ůĞĞǀĞ͕ϯ͘ϴϭϯ͟^ĞĂůŽƌĞ/ ϰ ϭϬ͕Ϯϵϲ͛ WŽƌƚĞĚWƌĞƐƐƵƌĞ^Ƶď ϱ ϭϬ͕ϯϱϲ͛ ϳ͟džϰͲϭͬϮ͟WƌĞŵŝĞƌWƌŽĚƵĐƚŝŽŶWĂĐŬĞƌ ϲ ϭϬ͕ϰϮϱ͛ yEŝƉƉůĞ͕ϯ͘ϴϭϯ͟ ϳ ϭϬ͕ϰϯϰ͛ t>'͕ďŽƚƚŽŵĂƚϭϬ͕ϰϳϮ͛ ϴ ϭϬ͕ϱϲϰ͛ ϭ ƐƚtŚŝƉƐƚŽĐŬ KWE,K>ͬDEdd/> ϯϬΗ ϰϴϱƐŬƐWĞƌŵĂĨƌŽƐƚ͚͛ ϭϮͲϭͬϰΗ ϭϰϲϵƐdžWĞƌŵĂĨƌŽƐƚ͚͕͛ϰϭϬƐdžůĂƐƐ͚'͛ ϴͲϭͬϮ͟ ϯϮϴƐdžůĂƐƐ͚'͛ ϰͲϭͬϭϲ͟ hŶĐĞŵĞŶƚĞĚ^ŽůŝĚ>ŝŶĞƌ t>>/E>/Ed/KEd/> <KWΛϳϬϬ͛ DĂdž,ŽůĞŶŐůĞсϭϬϬΣΛϭϭ͕ϯϵϬ͛ dŽƉŽĨtŝŶĚŽǁΛϭϬ͕ϱϲϰ͛ dZΘt>>, dƌĞĞ ϰͲϭͬϭϲ͟ϱ</t;ĚƌLJŚŽůĞͿ tĞůůŚĞĂĚ &DϭϭΗdžϰͲϭͬϮΗ,ĂŶŐĞƌ͕ϰ͘ϱΗd//ƚŽƉͬďƚŵǁͬϮͲϯͬϴΖΖƉŽƌƚƐ dсϭϭ͕ϴϴϲ͛;DͿͬdсϳ͕ϭϬϮ͛;dsͿ +DOOLEXUWRQ+26 &HPHQWHUDW ¶ KƌŝŐ͘<ůĞǀ͘сϱϲ͘Ϭ͛'ƌŽƵŶĚůĞǀ͘сϮϭ͘Ϭ͛ Z<Ͳd,&͗Ϯϯ͘ϵϱ͛;ŽLJŽŶϭϲͿ     ´2+WR7' (VW72&DW¶ ϵͲϱͬϴ͟ 7RSRI´ /LQHU# ¶ (VW72&DW¶  WdсϭϬ͕ϵϴϮ͛;DͿͬWdсϳ͕ϭϯϯ͛;dsͿ ´;2´ #¶ 5$7DJDW ¶ $UFWLF3DFN )DLOHG :KLSVWRFN #¶    7RSRI:LQGRZ #¶ :LQGRZ #¶ 3% #¶ ´2+ 3%%LOOHW #¶ ´ #¶ C W>h'<d/> Wϭ͗ϭϬ͕ϳϭϬ͛Dʹϭϭ͕ϰϰϬ͛DʹŝůůĞƚƐĞƚΛϭϬ͕ϳϭϬ͛ʹϰͲϭͬϭϲ͟K, ^>Kdd>/EZd/> <hW^ĂŶĚƐ dŽƉ;DͿ ƚŵ;DͿ dŽƉ;dsͿ ƚŵ;dsͿ &d ĂƚĞ ^ƚĂƚƵƐ 1a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: _1 Service Stratigraphic Test 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: Top of Productive Interval: 9. Ref Elevations: KB: 17. Field / Pool(s): GL: 21.0' BF: Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y- Zone- 4 TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y- Zone- 4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 (ft MSL) 22.Logs Obtained: 23. BOTTOM 13-3/8" H-40 115' 9-5/8" J-55 4,590' 7" L-80 7,299' 3-1/4" L-80 7,067' 2-3/8" L-80 7,165' 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MCF: Test Period Casing Press: Calculated Gas-MCF: Oil Gravity - API (corr): Press. 24-Hour Rate ACID, FRACTURE, CEMENT SQUEEZE, ETC. CASING, LINER AND CEMENTING RECORD List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, Uncemented Solid Liner4-1/16" TUBING RECORD Uncemented Solid / Slotted Liner 10,472'4-1/2" 12.6# L-80 SIZEIf Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): 12,492' 328 sx Class 'G' 6,917' 10,430' 30" 4.7# Surface 6,314'1469 sx PF 'E', 410 sx Class 'G' 3" 485 sx PF 'C' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Hilcorp Alaska, LLC WAG Gas 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 1/20/2022 2119' FNL, 318' FWL, Sec. 08, T13N, R10E, UM, AK 2016' FNL, 2581' FWL, Sec. 04, T13N, R10E, UM, AK 221-011 Milne Point Field / Kuparuk Oil Pool 56.0' 12,505' / 7,166' HOLE SIZE AMOUNT PULLED 50-029-22003-01-00 MPU L-06A 544920 6031351 2299' FSL, 1496' FWL, Sec. 04, T13N, R10E, UM, AK CEMENTING RECORD 6035811 SETTING DEPTH TVD 6036782 BOTTOM TOP 8-1/2" Surface 12-1/4"Surface CASING WT. PER FT.GRADE 6.6# 551336 552411 TOP SETTING DEPTH MD Surface Per 20 AAC 25.283 (i)(2) attach electronic information 26# 10,775' Surface 6,924' DEPTH SET (MD) 10,356' / 6,881' PACKER SET (MD/TVD) 10,419' 48# 36# 115' Surface 11,068' Gas-Oil Ratio:Choke Size:Water-Bbl: PRODUCTION TEST February 3, 2022 Date of Test: 3172 2/8/2022 24 Flow Tubing 948 182 Oil-Bbl: suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary 552182 Flowing 4-1/2" Slotted Liner 1/18/2022 11340' - 12212' 7092' - 7125' 12304' - 12492' 7141' - 7165' 330 PB 1: MWD / GR / RES PB2: MWD / GR / RES PB3: MWD / GR / RES A: MWD / GR / RES Sr Res EngSr Pet GeoSr Pet Eng N/A Oil-Bbl: Water-Bbl: 330 948426 1/16/2022 5/29/2021 ADL 025509 & 047434 88-002 1800' (Approx.) 10,564' / 7,000'N/A None 12,671' / 7,174' Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment By Meredith Guhl at 12:24 pm, Mar 14, 2022 Completion Date 1/20/2022 MDG RBDMS 03/14/2022 MDG DSR-3/14/22 GDLB 03/23/2022 MGR18AUG2022 Conventional Core(s): Yes No Sidewall Cores: 30. MD TVD Top of Productive Interval 11194' 7095' 11194' 7095' Kup A 11194' 7095' 31. List of Attachments: 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Joe Lastufka Contact Email:joseph.lastufka@hilcorp.com Authorized Contact Phone: 777-8400 General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment, whichever occurs first. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Formation at total depth: Drilling and Completion Report, Definitive Directional Surveys, Wellbore Schematic Signature w/Date: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. INSTRUCTIONS Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. TPI (Top of Producing Interval). Yes No Well tested? Yes No 28. CORE DATA If yes, list intervals and formations tested, briefly summarizing test results. Attach separate pages to this form, if needed, and submit detailed test information, including reports, per 20 AAC 25.071. NAME Kuparuk A (Fault) This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. Authorized Name: Monty Myers Authorized Title: Drilling Manager Permafrost - Base 29. GEOLOGIC MARKERS (List all formations and markers encountered): FORMATION TESTS Permafrost - Top Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment 3.14.2022Digitally signed by Monty M Myers DN: cn=Monty M Myers, c=US, o=Hilcorp Alaska, LLC, ou=Technical Services - AK Drilling, email=mmyers@hilcorp.com Reason: I am approving this document Date: 2022.03.14 09:05:38 -08'00' Monty M Myers _____________________________________________________________________________________ Revised By: JNL 3/10/2022 SCHEMATIC Milne Point Unit Well: MPU L-06A Last Completed: 2/19/2021 PTD: 221-011 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8" Conductor 48# / H-40 / Weld 12.715 Surface 115' 0.157 9-5/8" Surface 36# / J-55 / BTC 8.921 Surface 6,314’ 0.0773 7" Production 26# / L-80 / BTC 6.276 Surface 10,564’ 0.0383 3-1/4” Solid Liner 6.6 # / L-80 / TCII 2.850 10,430’ 10,775’ 2-3/8” Solid/ Slotted Liner 4.7# / L-80 / Hyd 511 1.995 10,425’ 12,492’ TUBING DETAIL 4-1/2” Tubing 12.6# / L-80 / TXP BTC 3.92 Surface 10,472’ 0.0152 JEWELRY DETAIL No Depth Item 1 31’ 4-1/2” Tubing Hanger 2 10,280’ Gauge Carrier 3 10,288’ HES X-line Sliding Sleeve, 3.813” Seal Bore ID 4 10,296’ Ported Pressure Sub 5 10,356’ 7” x 4-1/2” Premier Production Packer 6 10,425’ X Nipple, 3.813” 7 10,434’ WELG, bottom at 10,472’ 8 10,564’ 1 st Whipstock 9 10,775’ 2 nd Whipstock OPEN HOLE / CEMENT DETAIL 30" 485 sks Permafrost ‘C’ 12-1/4" 1469 sx Permafrost ‘E’, 410 sx Class ‘G’ 8-1/2” 328 sx Class ‘G’ 4-1/16” Uncemented Solid Liner 3” Uncemented Solid / Slotted Liner WELL INCLINATION DETAIL KOP @ 700’ Max Hole Angle = 100° @ 11,390’ A Top of Window @ 10,564’ TREE & WELLHEAD Tree 4-1/16” 5K CIW (dry hole) Wellhead FMC 11"x 4-1/2" Hanger, 4.5" TCII top/btm w/ 2- 3/8'' ports TD =12,671’(MD) /TD =7,174’(TVD) Halliburton HOS Cementer at 1,881’ Orig. KB Elev. = 56.0’ Ground Elev. = 21.0’ RKB-THF: 23.95’ (Doyon 16) 3 8 5 7 Cement Retainer @12,505’, 3” OH to TD Est. TOC at 8,820’ 9-5/8” Top of 3-1/4” Liner @ 10,430’ Est. TOC at 2,000’ 6 PBTD =12,505’(MD) /PBTD=7,166’(TVD) 3-1/2”XO 2-7/8” @10,952’ 2-7/8” @10,982’ 9 RA Tag at 10,304’ Arctic Pack Baker Flow Guard Liner Top Packer 10,419’ Top of Window @10,775’ Failed Whipstock @10,583’ Top of 2-3/8” Liner @ 10,425’ 4 2 1 PB2 @11,886’ 4-1/16” OH Top of Window @10,564’ Window @10,583’ PB1 @11,440’ 4-1/16” OH PB1 Billet @10,710’ 2-3/8” @12,492’ PB3 @12,133’ 3” OH PB3 Billet @11,535’ ` PLUGBACK DETAIL PB1: 10,710’ MD – 11,440’ MD – Billet set @10,710’ – 4-1/16” OH PB2: 10,775’ MD – 11,886’ MD – Whipstock set @10,775’ – 3-1/4” x 2-7/8” liner to 10,982’, 4-1/16” OH PB3: 11,535’ MD – 12,133’ MD – Billet set @ 11,535’ – 3” OH SLOTTED LINER DETAIL KUP Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup A2/A3 11,340’ 12,212’ 7,092’ 7,125’ 872’ 1/18/2022 Open Kup A2 12,304’ 12,492’ 7,141’ 7,165’ 188’ 1/18/2022 Open GENERAL WELL INFO API: 50-029-22003-01-00 Drilled and Completed by Pool Rig 102 - 11/27/1990 Pull ESP, set CIBP, Run Killstring by Doyon 16 - 5/21/2012 RWO Tubing Swap: 2/19/2021 A Sidetrack Completed: 1/20/2022 Activity Date Ops Summary 5/21/2021 Move rig to MPL-06A. Finish location prep in well cellar. Stage rig for backing over well Back rig over well and set down. Install cribbing and herculite in cellar area Accept rig at 21:30. Prep and lower 2" reel from rig. Install scaffolding in cellar area to access tree. Close in cellar and begin warming up Load and secure 2-3/8" reel onto rig. Install saddle clamps. Install Managed Pressure line in cellar. ND tree cap and prep to NU BOPE. 5/22/2021 Nipple up BOPE. PJSM with crane operator. Swap goosenecks from 2.0" to 2-3/8". RU pressure bulkhead and inner reel iron. Swap out gripper blocks. Swap risers on injector. On highline power at 09:15. RU Flowback tank. Dress stripper with correct brass and packoff. Pull coil across and stab. Test LEL and H2S alarms. MU CTC. Pull test to 50K. MU BHI, Grease and service all valves. Complete valve alignment checklist. Repair leak on Koomey (NPT fitting). Fluid pack all surface lines, coil reel and BOPE stack with 85 bbls fresh water Begin required BOPE test. BOP test witness was waived by AOGCC rep Lou Laubenstein on 5-22-2021. Test #1: IRV, Pack-off, C7, C9, C10, C16. 250/3500 psi Pass. Test #2: Blind/Shear, R2, BL2 and C15 Bleed off and tighten 7" R46 flange at bottom of BOP. Re- test. Pass. Test #3: Ann, TIW #1, B4, B3 Test #4: Upper 2-3/8" Pipe/Slips, TIW #2, B2, B3. Test #5: Lower 2-3/8" Pipe/Slips, C5, C6, C8, Test Valve 2. Test #6: Choke A, Choke C Drawdown Test on Accumulator. Test #7 Annular (3.0") C1, C4, TV1. Test #8 3" Pipe /Slips C2, C3 Clean and clear rig floor. RD BOPE test equipment and prep to PU window milling BHA. 5/23/2021 Clean and clear rig floor. Pressure test PDL's. Install floats in UQC. PT to 3500#. Good test. Load reel with 14 bbls 60/40 Methanol followed by 1% Slick KCL. Open well to closed choke. Well had 650# trapped pressure. Bled off. Perform 30 min no-flow check. Well static Make up window milling BHA. with 3.80" NoGo / 3.81 Go on both string reamer and window mill. Rih circulating 1% Slick KCL (120 deg). Rate in: 0.25 bpm, Rate out: 0.53 bpm. MW in: 8.33 ppg, MW out: 7.50 ppg Taking returns to tiger tank. Log tie in from 10300' to 10441.78' MD with a -22' Inadvertently opened sliding sleeve running in hole. Swap to 9.0 ppg Black mud. Free Spin: 2.68 bpm @ 3610 psi. Rate in: 2.68 bpm, Rate out: 2.72 bpm Circulating pressure: 3610 psi to 3702# . MW in : 9.04 ppg, MW out: 8.86 ppg Window ECD: 11.86 ppg. Mill Window f/10582' t/10583.6' Continue Milling Window f/10583.6 t/10589.6'. Rate in 2.7 bpm, Rate out 2.7 bpm. Circulating pressure 3810 psi to 3840 psi. MW in: 9.00 ppg, MW out: 8.78 ppg. Window ECD: 11.81 ppg. WOB - 1.5k to 3k Continue Milling Window f/10589.6' t/10600'. Decrease in WOB and Differential pressure noted. Light formation sand noted in bottoms up sample. Rate in 2.7 bpm, Rate out 2.7 bpm. Circulating pressure 3750 psi to 3760 psi. MW in: 9.00 ppg, MW out: 8.78 ppg. Window ECD: 11.82 ppg. WOB - 1.6k to 2k Finish milling 10' rat hole to 10600'. Backream with as-milled TF(25° ROHS) at 1fpm. Rate in 2.7 bpm, Rate out 2.83 bpm. Circulating pressure 3615 psi to 3700 psi. MW in: 9.00 ppg, MW out: 8.78 ppg. Window ECD: 11.80 ppg. WOB - 1.6k to 2k Backream 15° left of as-milled. Backream 15° right of as milled. Rate in 2.69 bpm, Rate out 2.83 bpm. Circulating pressure 3583 psi to 3647 psi. MW in: 9.00 ppg, MW out: 8.79 ppg. Window ECD: 11.83 ppg. WOB - .3k Over pull on last 15° right backream pass at 10582'. Pull over 4k. Attempt to RIH and tag with 10k down. PU to neutral weight and establish milling parameters. Mill back through window with as milled TF and .4k WOB. Backream with as milled TF Continue reaming passes through window as milled TF. .2k to .3k WOB as we pass 10589'. Little to no motor noted as we pass bottom of window at 10589'. Rate in 2.67 bpm, Rate out 2.78 bpm. Circulating pressure 3561 psi to 3580 psi. MW in: 8.99 ppg, MW out: 8.83 ppg. Window ECD: 11.82 ppg Continue milling/reaming top of window from 10585' . Dry drift down and get hung up at 10582' with 8k set down and 5k overpull. Position coil at neutral weight and bring pumps back on. RIH to continue reaming passes. Call Drilling Foreman to inform. Pump 9 bbl HiVis sweep and chase to tubing tail Continue reaming and back reaming window f/10582' t/10590'. Rate in 2.67 bpm, Rate out 2.78 bpm. Circulating pressure 3561 psi to 3580 psi. MW in: 8.93 ppg, MW out: 8.83 ppg. W indow ECD: 11.95 ppg. Minor motor work and WOB at ~ 10589'. Work coil at 10582' Unable to move. 5/24/2021 Detained at top of window. Work coil at 10582' Unable to move. Multiple weights from 12K down to -17K Multiple renditions at neutral. All cycling pumps. Observe HOT torque up every time. Good indication we are bit stuck. Pressure up and dump pressure on well multiple times. -Pressure up annular to equalize pressure across EDC. Open EDC. Circulate 10 bbl lube pill down to EDC. Close EDC. Squeeze lube pill by rotor and stator. Cycle pipe while circulating by stator. Discuss plan forward with drilling engineer Circulate KWF around. Pump 10 bbl HiVis Spacer followed by 11.8 ppg NaBr. Once spacer at EDC. Close and circulate around and up to tubing tail. Open EDC and finish circulation to surface. Flow check well. Well dead. Paint flag 10580.3' (10478.39' EOP) TOP of fish 10495.53' MD Disconnect. Cycle EDC. Lost weight. Tool disconnected. Rate in : 1.05 bpm, 0.92 bpm out. MW in: 11.74 ppg, MW out: 11.77 ppg. POOH No Flow well. Well Static. Inspect last 50' of pipe. No damage noted. L/D remainder of BHA #1 Pump forward at max rate to move eline downhole. Rig back and cut 361' eline. MU BOT external coil. Pull test to 50k Pressure test to 3500 psi. Prepare to pump 3/4" drift ball. Pump and recover 3/4" ball through coil. Begin MU fishing BHA. RIH with BHA #2. 3" GS Spear, Rupture Disc(5k), 3/4" Disconnect. G-Force Up/Down Jar, Wt Bars, G-Force Accelerator, 4 jts of 2-3/8" PH-6. Correct depth -22' at 10300.22 'to 10278.22' based on previous run correction. RIH to 10400' WT CK. PUW = 42k, RIH = 18k. RIH and set down 3K @ 10498.6. PU and confirm fish latched with 46k up weight(4k overpull). Jar fish free with first down jar. RIH 3' and pick up. Jar free and see 1.5k weight. POOH keeping hole full across the top. 5/25/2021 At surface, flow check well. Good no flow, PU the injector and LD the fish. Fish OOH, string mill has some gouges on the gauge. Pump slack back, cut 447' of coil to find wire , reel has 2.43% slack. MU CTC, pull test to 50k, good pull test, MU stinger and nozzle to pump slack forward Head up BHI UQC & PT. Good PT, Install floats, change packoffs and PT. Good PT, PU injector and remove the nozzle & stinger. MU 3.1° motor to the BHA and see if it will drift the BOPE & Tree - if we swap to mud to clean , this will tell us if we need to swap back to KWF to PU the build BHA Drift failed, MU the milling BHA and RIH. Close the EDC and log tie in. Online with pumps, 2.7 bpm 1:1 returns at 12:58 ECD at the window, we will stay on KWF to dress the window Correct depth -20.5', Up WT = 39k. Start working down at 10573' at 1 fpm. Stacking WT at 10592', stall PU and bit stuck, 52k Pull free. Begin time milling at 10588'. Repeated stalls at 10591.7 ' to 10592'. - 2.6 bpm in 2.7 bpm out Continue time milling at different speeds. .1' per minute to .1' per 10 minutes. Mill to 10591.7' with repeated stalls. Pull up hole and repeat passes. Repeated hard stalls at 10591.7'. No overpulls noted while PU. Rate 2.63 in/2.73 out. 11.83 ppg in/11.62 ppg out. Circ pressure 3800 - 3900 psi. POH POOH. 5/26/2021 Not able to clean up the bottom of the window, POOH to inspect mills and discuss a plan forward. OOH, flow check the well, good no flow, PU the injector to inspect the pipe and LD the BHA BHA OOH, tapered mill does not have any more wear on it than when it went in. The string mill has a lot of wear above the gauge on the up hole end. Call OE and discuss plan forward. Decision made to caliper the window & 7" to see if we can get a 3-1/4" liner through the window or set another WS RIH with READ 40 arm caliper logging BHA. Log Tie-In pass from 10330'. Correct - 21.5'. RIH and tag @ 10583'. PU and RIH again. RIH and tag @ 10594.4'. Repeat and confirm tag. Wait for timed caliper arms to open. Log pass up @ 50fpm to 10,000'. POOH to surface OOH. Flow check well and confirm no flow. LD caliper tools and check for data. Heavy mud/shcmoo on BHA. Confirm good data and wait on processing from READ Houston Continue to wait on final processed logs from READ Houston. Final logs received. Discuss forward plan with CTD team. 5/27/2021 Processed Caliper Data and found the Whipstock released and was on bottom. Decision made to wait for and run the Northern Solutions Whipstock. Perform equipment maintenance and housekeeping while waiting for Whipstock to be delivered to the slope. 50-029-22003-01-00API #: Well Name: Field: County/State: MP L-06A Milne Point Hilcorp Energy Company Composite Report , Alaska 5/23/2021Spud Date: Mill Window f/10582' t/10583.6' 5/28/2021 Continue equipment maintenance & housekeeping while waiting on Whipstock Northern Solutions on location with Medium Expansion Wedge whipstock. Prep tool in pip shed and hold PJSM for PU MU NS whipstock to Inteq BHA RIH with BHA #5. NS 4 1/2" x 7" Whipstock with EDC in open position. Log tie-in pass from 10315' @ 5 fpm. Correct - 23.5'. RIH to setting depth of 10574' (BOWS). Close EDC. Orient WS 5 degrees LOHS. Pressure up coil to 3100 psi and see good indications of set. Set down 5k on whipstock POOH w/NS whipstock setting tool. Rate in .85 bpm Rate out .36 bpm. MW in 11.75 ppg. MW out 11.70 ppg OOH with Whipstock setting tool. Hold PJSM and flow check well. Confirm no-flow and LD setting tool. MU Northern Solutions window milling BHA with straight motor and 3.80" diamond window mill RIH with BHA #6. Northern Solutions 2 7/8" straight motor, 3.80" string reamer, 3.80" diamond window mill. RIH at 5000' at report time. MW in 11.76 ppg/MW out 11.69 ppg. Rate in .72 bpm/Rate out 1.21 bpm. 5/29/2021 Continue RIH with Window Milling BHA. Displace coil to drilling mud while logging tie in. Correct depth -23', displace well to Drilling Mud Well swapped to mud, close EDC and RIH to tag the pinch point. Dry tag at 10562.6'. Start milling window at 10564.9'. PU WT = 38k. Free Spin 2.5 BPM at 3600psi, WOB = 0.5-2.9k. In Rate = 2.5 bpm, Out Rate = 2.5 bpm. MW In = 9.08 ppg, MW Out = 9.06ppg. ECD = 11.9, IAP = 1383psi, OAP = 23psi 11:07. 10567.34' PU above the WS pump #1 liner gasket is leaking (pump 2 had to be shut down just after we started milling to replace a fluid end). Trap 12.1 ECD while pumps are off line to repair pumps. RU test pump to pump in sub on the lubricator to maintain ECD above 11.8 ECD Pump #1 back online, continue milling window from 10567.34' to 10571.7' (possible btm of window). In 2.5 bpm, Out 2.5 bpm. WOB falling off as we exit window 3.8k - .6k. Mill rat hole to 10582'. Ream window three times at 1 fpm. Dry drift clean. 85% sand noted in sample from 10,574' Open EDC and begin displacing to 9.0 ppg black mud to 11.8 ppg NaBr KWF. POOH f/10550' t/surface. 11.72 ppg NaBr In. 11.62 ppg NaBr Out OOH - PJSM. Flow Check Well - No Flow. LD BHA #6 Window mill and reamer. Window mill gauged 3.79" no go. Jet BOP stack with jet swirl nozzle. MU BOP test joint and function test BOP's. Clean and clear rig floor. 5/30/2021 Function test BOPE, MU Build BHA with a 3.1° bend motor, RIH. Log tie in while displacing coil to drilling mud, -20' correction, displace well to mud. Well displace, close the EDC and RIH to tag and start drilling build On bottom drilling at 10584'. PU WT = 38k. Free Spin 2.85 BPM at 400psi, WOB = 1-3.25. In Rate = 2.85 bpm, Out Rate = 2.95 bpm. MW In = 9.14 ppg, MW Out = 9.07ppg. ECD = 11.80, IAP = 1345psi, OAP = 53psi. At 10725' avg 41° DLS Drill ahead from 10976'. WOB = .8 - 2.5k. In Rate = 2.82 bpm, Out Rate = 2.97 bpm. MW In = 9.27ppg, MW Out 9.09ppg. ECD = 11.95, IAP = 1384, OAP = 338 psi. Average 41° DLS. Land build section at 10985' Pump 5 bbl Hi/Lo vis sweep Displace coil and well to 11.8 ppg KWF and lay if from 10985'. 3k over-pull noted pulling through window at .5 bpm. At 10549' Open EDC and finish displacement to KWF. POOH to surface. IN MW = 11.8 ppg OUT MW = 11.8 ppg. OOH LD Build BHA bit grade 1:1. MU and RIH with lateral BHA with 1.1° motor RIH with Lateral BHA with 1.1° motor and 4 1/16" re-run Hycalog bi-center bit. Begin displacing to 9.1 ppg drilling system. Log tie in pass at 10330' Correct -21.5'. RIH to right above window and finish displacing to 9.1 ppg drilling system. At bottom up 1.5 ppm H2S noted. Divert 30+ bbls outside . Continue displacing to 9.1 ppg drilling system. Close EDC and log CCL pass from 10250' to 10560'. 5/31/2021 CCL log from 10250' to 10560'. Close EDC and RIH, tag at 10562'. Try setting down light weight and orient 20° L&R, no go. PU 10', online with pump at 0.5 bpm RIH, tag again with 50psi diff pressure. Shut down pump, PU and orient to 90° ROHS, tag, orient to 90° LOHS, tag. Orient to 180°, tag Not able to get past the TOWS, POOH for Tapered & String Mills. OOH, space out, shut down pump trapping 946psi WHP. Line up on MPL to maintain 946psi WHP (11.8ECD) at the window Start pressure un-deploy checklist. Can't get a test on the QTS, found the No-Go Plate is too thick and is covering the test port. PT the connection with the mud pump below. Good PT, continue undeploying the BHA BHA OOH, found 1 of the water courses on the pilot mill of the bit packed of with formation. PU the milling clean out BHA and pressure deploy BHA deployed, RIH with straight motor and mills. Tie in, -25' correction, close the EDC. Up WT = 35.5k. RIH at min rate, made it to the bottom of the window. PU above the WS and bring pump on at full rate, RIH slow , made it down to 10585' and started stacking WT. PUH slow to the TT RIH and ream across WS Tray. Dry drift through window from 10550' - 10575' without any set down. PUH and pump 3.0 bpm up and down through 7" section. Pump final hi/lo sweep off bottom POOH. In rate = 3.0 bpm. Out rate = 2.69 bpm. MM in = 9.34 ppg. MM out = 9.17 ppg. Reverse jog at 250' - Metal shavings/pieces noted at shaker on bottoms up. Return MM appeared to be plugging. Blow out at surface. OOH - PJSM and prepare to pressure un-deploy Start pressure un-deploy checklist for clean out BHA #9. All nozzles on mill clear. Pressure deploy BHA #10. Lateral BHA with 1.1 degree bend and 4 1/16" Hyc bi-center bit. RIH with lateral BHA #10. -Lateral BHA with 1.1 degree motor bend and 4 1/16" Hyc bi-center bit. MW In = 9.19 ppg MW Out = 9.14 ppg. ECD 11.8 ppg. Rate In = .5 bpm Rate Out = .97 bpm Log tie in pass from 10330'. Correct -30'. Cont RIH to window. Close EDC. WT CK at 10545' = 38k Tag at 10915' at drilling rate. Drop to min rate and attempt to RIH to bottom. In rate 2.85 bpm. Out rate 2.87 bpm. MW in = 9.2 ppg. MW out = 9.15 ppg. ECD = 11.85 ppg. Attempting to run past 10915' to 10918'. 6/1/2021 Continue RIH to TD at 10985' at min rate. Taking WT at 10584' (start of the build with 3.1° bend motor). Tag at 10915', PU and ran past then tagged at 10921' continue working through shale at reduced rates and speeds. PU, increase rate to clean up behind us then RIH at a reduced rate to work back to TD Almost packed off 2-3 times while cleaning up the OH. RIH at min rate and tagged at 10916, PU and increase rate to 2.0 bpm, RIH at 8 fpm. Tag at 10915' with WOB and motor work, shut down pump and PU. RIH at 2 bpm at 5 fpm, tag at 10516', shut down pump and PU PUH slow circulating while discussing current conditions with the Town Team in the Morning Call. Continue PUH to the 7" pumping pills to clean up the 7". Verify BOT has an OH billet Decision made to drill drill ahead, if we side track keep going and see where we come out once we drill past the fault. RIH. Tagging at 10555', PU clean, tag at 10550', PU is clean and tag at 10546' we are losing ground in the 7" and it should be clean, check counter wheel Counter wheels are clean, PUH and tie in to make sure we are on depth with the window, correct depth -4'. RIH and tag at 10555', online at 1.0 bpm made it down to 10574' then stacked out, shut down pump and PU to up WT. RIH tag at 10567', looks like we have dragged up a lot of shale into the 7", Decision made to POOH for clean out BHA, flow check and POOH. 700' from surface the drilling choke is cycling to keep from packing off with cuttings OOH Start pressure un-deploy. BHA OOH, MU Clean Out BHA with a 3.76 D331 mill & 2.2° motor and deploy BHA deployed, RIH. Keep 11.8# ECD at window while RIH. After 10000' go to max pump rate (3.4 bpm) through open EDC pump 1 tubing B/U while tie in depth. Correct -27.5'. After B/U close EDC. Exit WLEG pumping 3 bpm. RIH to just above top window slowly. Pump 10 bbls hi-vis sweep around. Some counter wheel slippage, pick up 10310' and tie-in again. Correct +18.5'. Run back to just above top window, pump another 10 bbls hi-vis sweep at 3 bpm. Try window at 1 bpm, tag at 10573'. Try window at 1.7 bpm, pass window with 1k DWOB then go to full pump rate. RIH slowly, short pickup at 10620' is clean. Clean pass down to 10655' takes 1.8k DWOB there then falls off. Short pickups at 10700', 10800', 10900' are clean. MW 9.1+ In / Out. 2.97 / 3.1 bpm In / Out at 4130 psi. Continue RIH. Pump another 8 bbls hi-vis. Stack wt at 10910'. About 4k overpull with slight packoff. Pick up hole until cleans up. RIH, stack wt same spot twice. Push past to 10920' at lower ROP and pick up 4k over, some packoff seen reduce pump and pull through. Pull wiper trip. RIH to 10928'. Short wiper trip from 10928' to above shale, slight overpulls. RIH. Pickup at 10950' is clean. RIH and tag TD at 10985'. Wiper trip back to window. Clean pass. Pull through window at 1.5 bpm, no issues. Go back to full rate, continue wiper. Start packing off in the 4-1/2" tubing. Reduce rate and try to run back in, can't move up or down. Work pipe and pump for about 15 min to free up CT, regain circulation and movement. Pump 10 bbls hi-vis sweep. Inspect depth counter wheel while circulating. RIH and tie into RA marker. Pass window at 1 bpm, no issues. Correct -3'. Pick back up through window and go to full rate. Pull BHA partially into the tubing, no issues. RIH back through window at 1 bpm, no issues. Go to full rate, RIH. Tag TD 10985'. No issues going to bottom. POOH. Pump 10 bbls hi-vis sweep. Clean pass to window. Pull through window at 1.5 bpm. Perform jog across whipstock tray with open EDC at 3.3 bpm while dry drifting window. Pump 10 bbls hi-vis sweep. Reciprocate 2 times across 7" casing. Choke is partially plugging. POOH pump 3.3 bpm. 6/2/2021 Continue POOH with clean out BHA chasing pills Tag up, RIH 1.2' to start pressure un-deploy. BHA OOH, mill gauged 3.76 Go 3.75 No Go. MU and run drilling BHA RIH with the drilling BHA. Correct depth -8', close the EDC and RIH at min rate. Bobble at 10863' (gamma spike), another at 10924 but passed through Tag at 10989' PU and bring pumps up to rate. On bottom drilling at 10988'. PU WT = 35k. Free Spin 2.80 BPM at 4100psi, WOB = 2-3.25. In Rate = 2.80 bpm, Out Rate = 2.90 bpm. MW In = 9.19 ppg, MW Out = 9.02ppg. ECD = 11.81, IAP = 761psi, OAP = 56psi. Ran into something hard at 11,048', ROP 90+ to 5 fph Drill to 11152'. Pull wiper back through shale at drilling rate, clean pass. RIH to bottom at 0.5 bpm, stack wt at 10922'. Up wt is 40k. Pulll short wiper, try to pass at 30 ft/min, 1 bpm stack at 10924'. Up wt is 42k. Try to pass at 1.5 bpm, no go. Up wt is 48k. Ream past at 2 bpm. RIH to bottom. Drill from 11153' to 11305'. MW 9.1+ In / Out. Rate = 2.75 / 2.81 bpm In / Out. Pump 10 bbls hi-vis sweep Short wiper from 11305'. Clean pass up and down. Drill from 11305' to 11440'. MW 9.24 / 917 In / Out. Rate = 2.68 / 2.75 bpm In / Out. Abrupt slowdown in ROP at 11408'. Reduce inc in case this is the D-shale. Pump 10 bbls hi-vis. Long wiper trip from 11440'. 6/3/2021 Continue long wiper trip from TD at 11441'. Had over pulls with negative WOB starting at 11200' for ~100'. Saw the same at the B-Shale at 10924' and just below the window before pulling through. Got above the window and started cleaning up the 7" while having discussions with the town team Continue reciprocating the 7" with pill pulling up into the TT to make sure it's clean while town team discusses our plan forward. Bottoms up brought up a lot of nickel & dime size rocks, still getting a lot of rocks back, choke is cycling a lot to clear the rocks coming back Packed off, shut down pump, ECD at 12.3 and holding, still able to move coil up and down so our surface lines are packed off. Line up to blow down surface lines. Lines are clear, online and packing off again but cleared, continue circulating pills out and back to surface while WOO Decision made to clean out to the fault to prep for liner and don't get stuck. Quick tie in to RA, +2' and RIH at min rate. Stacked out at 10921', PU WT = 37k, set down again, online at 1.7 bpm and clean out B-Shale to 10930' Stacked out again, PU, RIH at full rate and try working down Set down at 10915' PU and pulling heavy, packed off, shut down the pump, relaxed and pulled free. PUH to the window while calling OE. Continue POOH to the window, pull into the 7" and circulate until clean Drift to 10860' for possible Billet Set at 10840'. Drift was clean, a couple small bobbles at 10725' & 10848'. POOH to the 7", open the EDC and POOH pumping at max rate Undeploy BHA #12 lateral drilling BHA. Deploy BHA #13 billet. RIH with BHA #13 billet. Keep 11.8 ppg at window. Slow down RIH across jewelry. Log tie-in at 10330', correct -5' Stop and close EDC. RIH carefully to window. Stack weight at 10572'. Pick up and try different orientations in case slips are hanging on window lip. Use MPD line to keep ECD while trying to pass window. Try 6 times at various orientations and WHP, not able to pass POOH with billet BHA. Keep 11.8# ECD on well Tag stripper and spaceout. Undeploy BHA #13 billet BHA and inspect. No scrapes, gouges or other markings to indicate a mechanical hang-up in the window Clean and clear rig floor. M/U new BHA configuration for cleanout of window area. 6/4/2021 MU a Cleanout Milling BHA and RIH. Log tie in, correct depth -10', close the EDC and RIH to clean out the window to the billet set depth. PU WT = 35k, online with pumps at 2.95 bpm. Pass through the window was clean and clean down to 10755'. PUH chasing 10x10 pills to the TT RIH pumping pills back to 10750'. POOH from 10750' chasing pills to the TT. RIH pumping pills to 10780' (below the window). POOH chasing pills to 500' inside the TT. Stop at 10555', shut down pump and trap 11.8 ECD, drift to 10750'. Window to 10750' is clean, POOH pumping into the 7" POOH pumping another set of pills for the 7" and chase up to the TT then POOH pumping through the motor. OOH, undeploy the cleanout BHA BHA OOH, deploy the Billet BHA RIH with BHA #15 billet. Tie-in depth at 10330' correct -12'. RIH to 11525 and close EDC. Up weight here is 36k RIH to window, stack 4.3k at 10573' sit there a moment then push through. Keep 180R TF while RIH to set depth. RIH to 10722.3' (leaves top billet at 10710') get up weight then pressure up CT to shear off. Pressure up several times and wait, shears off at 4600 psi after 10 min. Set 5k down to confirm Billet is set with top at 10710' oriented for a low-side kickoff. POOH keep 11.8# ECD at window Tag stripper and spaceout. Undeploy BHA #15 billet setting tool. Tools have functioned normally. Offload and prep rig floor for BOP test Pull checks from UQC. Install nozzle. Jet stack, displace reel to water backwards, then forwards for slack management. Cable is heard moving both ways Change out packoffs. Line up valves for BOP test Test BOPs. Witness waived by AOGCC Inspector Guy Cook. 6/5/2021 Continue testing BOPE. BOP & Draw Down Tests completed 4.5-hr test RD Test Equipment. Swap lubricators, install BHI Floats & PT connection. PT floats & Lubricators, good PT, displace coil to drilling mud MU the drilling BHA with 1.2° AKO and new bit. Pressure deploy and RIH. Tie in, correct depth -11', RIH to tag Tag TOB at 10711', PU and bring pumps online. Tag at 10710.25', auto drill off billet at 1 fph for 1' then 2 fph for 1', then 3 fph for 1' then 1k WOB Off the billet. Drill from 10713' to 10850'. MW 9.1+ ppg In / Out. 2.69 / 2.73 bpm In / Out at 4150 psi free spin Wiper trip from 10850' past billet to 10650'. Pull past billet at 0.5 bpm, clean pass. RIH past billet at 0 pump, about 2k weight loss seen running past. Continue drilling from 10850' to 11000'. MW 9.1+ ppg In / Out. ROP is from 25 - 60 ft/hr with 1-3k DWOB. 150' wiper from 11000' is clean both ways Drill from 11000 to 11150'. After 11020 ROP increase is likely A3 sand. Start new mud down CT. Mud WT is 8.86 / 8.78 ppg In / Out Wiper trip from 11150' to window. Pump 5 bbls lo / hi vis around. Jog just below window. Build section is ratty, some overpulls and packing off pulling through there. Pump sweeps to surface and tie-in, correct +2'. 6/6/2021 Continue wiper trip, circulating bottoms up above the window, choke cycling a lot to clear cuttings and shale coming back. Returns have cleaned up, close the EDC and RIH to continue drilling Back on bottom drilling. Free Spin 2.91 BPM at 3900psi, WOB = 1.5 - 2.75k. In Rate = 2.91 bpm, Out Rate = 3.04 bpm. MW In = 8.88 ppg, MW Out = 8.67ppg. ECD = 11.76, IAP = 897psi, OAP = 400psi. Perform BHA wipers every 150' Drilled 425', poor WT transfer, wiper to window. Packing off and overpulls at window area. Reciprocate pipe below window, pull through and jog above window. Pump 10 bbls lo / hi vis sweeps. Pick up to 10000' pump 3.5 bpm Well unloads dime and nickel size rocks for 20 min. Pump another 5 bbls lo / hi vis sweeps. After well cleans up correct depth -2'. Close EDC and RIH. No issues through window. Drill from 11575' to 11660'. MW 8.8 ppg In / Out. 2.95 / 2.99 bpm In / Out. Slow ROP pump 5 bbls lo / hi vis, frequent pickups. ROP better after 11610' Short wiper from 11660'. Clean pass up and down. Drill from 11660'. MW 8.9 / 8.8 ppg In / Out. ECD is 11.82# at window with 660 psi WHP. ROP is 40 - 60 ft/hr with 1.5 - 3k DWOB. At 11700' pump 5 bbls lo / hi vis sweeps. 6/7/2021 Continue drilling lateral to TD at 11885 Drilled to TD at 11885', allow WOB to drill off and wiper trip to the window chasing pills. Pulled clean to 10640, went to jog in hole and we are packing off at same depth on every trip. Pulled into the 7", low side the bit and pump to clean up the low side of the hole to the tubing tail 30' from the tubing tail, pulled a little weight then packed off and got stuck in the tubing tail. We can orient the motor but able to see any changes in annular pressure. Work pipe down a few times with no movement. PU to 55k (20k over) no movement Pull to 55k a couple more times and able to move up 35' then stuck again, RIH and stacked out, pulled free while picking up at ~50k. PUH until clean, log tie in while circulating a bottoms up then RIH to clean up the tubing, 7", build section and pass through the fault to 11200'. Correct depth +3' RIH to the window at max rate then PU to the TT. Clean, RIH to TD to check the build section, B-Shale and fault. Tag TD, PUH pumping 120k LSRV Pill. Tag at 11436', transition from left to right in the A2 Shale, PU then passed through. Tagged 11886, POOH to the window chasing 120k LSRV pill Packing off at 10985', work pipe up and down to clean up the debris. 10679, packed off, shut down pump, pull 50k, broke free, with returns online with pump. Packed off at 10660', made it into the 7", PUH and we are packed off in the 7". Worked free, we have good circulation, shut down the pump Open the EDC and POOH for the D331 clean out BHA. Pump 3.4 bpm. POOH 15 ft/min. At 10219 choke B plugs off completely. Switch to choke A and clear choke B. Continue POOH slowly. Pump 5 bbls lo 10 bbls hi vis sweeps. Well flows back rocks for about 40 min then quits. Continue POOH swap back to choke B. Continue POOH some minor choke plugging periodically. More choke plugging near surface, do 200' jog then tag stripper Undeploy BHA #16 lateral drilling. Bit is 1-1. Deploy BHA #17 cleanout BHA with 3.71" D331 mill. Blow down chokes A, B while changing BHA RIH BHA #17 cleanout. Pump 3.1 / 3.7 bpm through open EDC Tie-in depth from 10320' correct -13'. Close EDC. Clean 7" lowside toolface from tubing tail to just above window. Reciprocate 7" twice then pass window. Pump 5 bbls lo 10 bbls hi vis sweeps. (leaves top billet at 10710') get 6/8/2021 Continue cleaning out the 7" to run liner. 7" is clean, RIH to clean out the build. Tag at 10640', PU slow, packing off a little then cleared. Returns are 1:1, clean out to 10700'. Made it to 10695' PU to the 7" and chase up into the 4-1/2. Pulled into the TT, packed off and got stuck then worked free Pump a bottoms up then RIH. RIH to the window clean, PUH to the 4-1/2 to verify the 7" is clean. 7" is clean, RIH to clean out the build section. Stop RIH and shut down pump #1 Cracked fluid end needs to be replaced. Circulate with Pump #2 above the window while repairing PT Pump #1. PT pump #1 to 4700psi Good PT drift to tag to clean out the build section. Tag at the bottom of the window 2x, PU and bring the pumps on and clean out in 50' bites. Worked down to a tag at 10979', PU and packing off a little, PUH to the 7". Trip clean all the way up to the 4-1/2" tubing, RIH. Cleaned out to 11150' PUH to TBG Clean trip to the TBG, circ bottoms up with pills. RIH through window at 0.3 bpm, try to drift to bottom. Set down 10657', 2x. Go to 2.5 bpm ream past to 10700' nothing seen. Pull wiper back to window. Pump 5 bbls hi-vis sweep. Pull back to 10500' to verify TT has clean entry. Drop rate to 0.4 bpm and try drift again. No go tag at 10656'. Pick up and ream past at 2 bpm. Continue drifting at 0.4 bpm tag at 10980', 2x. Pick up and try to ream past at 2 bpm as drilled TF, no go Pull wiper trip back to window. Clean pass. RIH past window clean. RIH try to drift to TD at 0 pump, 40 ft/min. Set down at 10946' 2x then past. Set down at 10978'. Go back to 2 bpm. Set down at 10978' Pick up and try to ream past 10978' at 2.1 bpm. Setting down, go to 2.8 bpm as drilled TF, 5 ft/min. No go, stack 4.7k can't get past. Try again 3 ft/min, No go. Turn to 0L and back to as drilled TF (85L) while sitting on it 3-4k DWOB. No-go. Increase rate to 2.9 bpm try at 0L TF. Try at 0l, 2.9 bpm. Stacking wt at 10970'. Pump 5 bbls hi-vis. Try again at 85L tag 10978'. Stack 5k wt try and push through. Try to orient while sitting on it. No progress. Pull 100' wiper. Clean pass up and down Try reaming at 0L TF. Stack 4-5k DWOB rotate TF 360 deg see if there is any preferred direction. At 180L start to make progress, push through to 10990' and DWOB falls off. Pull short wiper, 2k overpull then clean. RIH past 11150. Get 50' increments then pull back 50' each time. Stacking at 11208' Turn around and stack wt at 11200', pickup is 43k. Pull 150' wiper. RIH, stack wt at 11215' pickup 4k over. Pump 5 bbls hi vis pull short wiper. Try to work down past 11205' Stacking wt pulling 7k over. Pull wiper to 11000'. RIH 2.5 bpm stack wt to 11240' Pickup from 11240 pull 5k over. Try to get back down, difficult to get back to 11240'. Make it to 11245' clean pickup for 50'. Continue working down not making much progress, stacking repeatedly. Pickup at 11255' is 55k with -8k DWOB and packoff, pump trip Wiper trip to window. Periodic overpull with packing off in lateral. Just below window pulling over, cycle pump and CT to break loose. Pull into 4-1/2" slowly and lose returns. Work pipe and pump to break loose. Continue picking up. Well unloads rocks for about 10 min. Pump 5 bbls hi-vis RIH to 11550' and open EDC. Clean 7" from bottom of whipstock to WLEG. Clean entry into WLEG. Sweep doesn't bring much additional cuttings. RIH to 10550' close EDC Pass through window clean go to 2.5 bpm. Pass billet clean. Tag 10935' then pass. Tag 10977'. Rotate while stacking weight and push through. Tag at 11200' up weight is 49k with -7k DWOB, packoff and pump trip. Pull back to window. Packing off and losing returns just below window. Cycle pipe and choke to regain circulation. Pulll through window go to 2.7 bpm. Pull into tubing slowly circulate 5 bbls hi-vis sweep around. 6/9/2021 Continue circulating the wellbore clean. Log tie in, correct +8'. RIH to see where we tag for a potential protection string. Tag at 10959' with 8k WOB. PU and ran past then tagged at 10982, PU tag at same depth with 7k WOB. PU and tag same depth with 15k WOB, pretty solid right here, POOH to 7" Decision made to run a 3-1/4' Protection string to come back later and set a WS and re-drill. Close the EDC and make 1 more drift to tag 10982' for hard bottom for liner. Solid tag at 10982', moving fluids from and to the pits to pump KWF Online with KWF, RIH to TD. Spacer & 2 bbls out, POOH laying in the 11.8 Liner Pill. Above the window, displace the well to 11.8 KWF. PUH, log tie in, correct depth +2'. Paint a Flag - EOP = 9869.20' (Bit = 9939.84'). Well displaced, shut down and flow check well Well appears to be charged up, close the bleed valve, pressure came up to 30psi. In and out densities at 11.77 ppg. ECD at the window = 11.74. ECD on the BHI Tool = 11.78 Bled back 1.2 bbls in 15 min. bled back 0.5 bbls next 15 min. bled back another 0.5 bbls in 15 min. Bled back 2.2 bbls in 1-hr. RIH and circulate a bottoms up Tag 10892', pump 5 bbls and POOH slow. 20 bbls from bottoms up we are getting back crude cut brine. Divert returns to the Tiger Tank. Sent 30 bbls out side, Out Density at 11.8ppg, bring returns back inside. In and out densities look good, shut down and flow check the well. Well slowly built up and leveled off at 16psi. 16psi is equivalent to 0.04ppg that we lack to be balanced with the formation. Notified the Drilling Manager and Engineer Wait on 12.0# fluid from Deadhorse.. Continue circulating 1 bpm keep 12# ECD at window with 60 psi choke pressure. Well is taking about 2 - 3 bbls/hr. Tie-in depth, no correction. Start 12.0# brine down the CT. Pass through window and past billet with no issues. Lay in 12.0# brine from 10980'. About 40 bbls from surface returns getting light, divert to tiger tank. 6/10/2021 Continue circulating 12.0ppg brine around. Good 12.0 brine to surface, shut down and flow check the well. Good 20 min flow check, well took 1 bbl to get fill the hole (~3 BPH loss rate) POOH to 9939.84' to paint a flag for the Protection String then continue POOH. OOH, flow check well, good no flow, PU injector and LD the BHA BHA OOH, prep to rest Packoff that saw pressure while monitoring the well Packoff tested to 250psi low and 3500psi high. Prep rig floor to run protection string MU Protection String as per summary Protection string MU, RIH. Stop at the Flag, BOT Depth = 10,488.93 EOP = 9888.4. Correct depth -20.2' to 10,468.73' and RIH. PU WT = 45k, RIH, tag at 10966' then 10975', tag 2x, ~7-8' off bottom. PU 50k and bring pump online to jet down Not making any headway, pump off the liner and PUH to tie in, 44k up WT looks like we are off the liner. PUH to log tie in pumping at 0.5 bpm just in case we are still on the liner. Correct depth +8' to 10874.86, liner is on bottom RIH to 10970' just above the TOL and displace the 12.0ppg Brine out with 1% KCl. Remove the liner length from the BHA for TomKat to read proper ECD's for this depth. Swap well to KCl from 10' above liner top. With 10 bbls KCl out start POOH. Keep 12# ECD while POOH. At 2800' swap to freeze protect fluid. Chase FP with KCl water, lay in FP 1:1 to surface. Tag stripper, undeploy BHA #18. Remove BHI UQC. Install boot on cable. Make up nozzle and get on well. Pump 50 bbls fresh water, 30 bbls inhibitor, 10 bbls MeOH, followed by N2 purge. Allow N2 to bleed off to tiger tank. Purge surface lines with air. Start RDMO checklists. 6/11/2021 Continue with RDMO Ops. Cut off CTC and boot eline. Remove Reel Iron and Pressure Bulkhead. Install Grapple to un-stab coil. Un-stab coil and secure at the reel. Offload Reel Continue with RDMO Ops and swap to RWO configuration. Rig down and disassemble both PDLs. Remove hydraulic hoses and winch from PDLs. R/D choke and kill line, MPD line. Install cap on MPD line Bleed Koomey and remove hydraulic hoses from BOPs. Remove BOPs from tree. Purge water and steam lines with air. R/D interconnection area hoses. Continue with RDMO checklists. Rig Released at 06:00 6/12/2021. RIH to 10970' just above the TOL a Protection string MU, RIH. Stop at the Flag, BOT Depth = 10,488.93 EOP = 9888.4. Correct depth -20.2' to 10,468.73' and RIH. PU WT = 45k, RIH, tag at 10966' then 10975' Activity Date Ops Summary 1/10/2022 Accept Rig at 14:00, start Well Ops, hold Pre-Spud with Crew, load 10 bbls of neat meth in coil followed by fresh water for initial trip in hole. Pressure up to 1450 psi, open up well to a closed choke, WHP = 1325psi, RIH taking returns art 1450psi to the tiger tank. Nabors will be credited 20-hrs for work they performed while under the Pressure Upgrade that was for MP L-06A, loading the reel, stabbing pipe, MIRU Checklist, Continue RIH with 2.75" nozzle to displace well. Keep ~1450 psi WHP while RIH. Stop at 10850' and circ remaining KCl water around followed by 8.7# drilling mud. Mud at nozzle, pump 20 bbls out then start POOH. When clean mud is back bring returns inside. MW is 8.7# In / Out. Adjust gooseneck while POOH. At surface, trap 1400 psi and shut swab. PJSM for changing packoffs and installing mouseholes. Lift injector off and change packoffs. PT to 250 / 4500 psi, good. Lift off well and remove nozzle. PJSM then pressure deploy BHA #2, whipstock BHA. RIH with BHA #2. 05:10 - Stop and check saddle bolts on reel. Continue RIH. 1/11/2022 Continue RIH with WS BHA maintaining 12.1 ECD at the window, log tie in from 10250', correct depth -14', PUH to 10300' and log CCL for liner top placement and WS set. CCL Log shows a collar 1' above the bottom of the window. Call OE and discuss moving the WS up 10' to TOWS at 10775'. OE Agrees, discuss with Geo and DD, all good. Verify depths and RIH to set TOWS at 10775'. PU WT = 32k, PU to 27k, stop and set WS, bit depth at 10786.69' at 27k up WT WS sheared at 4800psi, set down 5k WOB to ensure its set, no movement, POOH following pressure schedule. OOH, lost 4.5 bbls on TOOH, tag up, RIH 1.1' to start pressure un- deploy procedure to pull WS setting BHA BHA OOH, work on HMI to rename a couple channels Hold PJSM to Pressure deploy the milling BHA, deploy BHA RIH with the 2.74" milling BHA and 0.6° bend motor. Tie-in depth from 10300'. Correct -13'. RIH to 10700' and close EDC. Light tag at 10776'. Pick up and bring pumps to 1.8 bpm. Ease down and engage whipstock tray at 10777'. Mill window at 1.8 / 1.8 bpm at 4200 psi FS. ECD is 12.15 ppg with 1150 psi WHP. Pann = 4460 psi. Mill to 10781'. Continue milling window from 10781'. 1.8 / 1.8 bpm at 4250 psi Free Spin. ECD is 12.11 ppg with WHP = 1150 psi. MW 8.56 / 8.72 ppg In / Out. Pann = 4448 psi. Mill to 10782'. After 10782' start drilling rathole at 20 ft/hr. Drill to 10792'. Perform 3 reaming passes at 0, 15L, 15R. Pump 5 bbls hi-vis sweep around. Dry drift is clean. Open EDC and POOH. Pump 2.1 bpm / 4000 psi while POOH. Perform short jog at surface. Tag stripper and space out BHA. PJSM then undeploy BHA #3. 1/12/2022 BHA OOH, gauge mills 2.74" go 2.73" no go MU Lateral BHA with 0.9° bend motor and Duraforce XD Bit RIH with lateral BHA, test agitator, open EDC continue RIH. Log tie in at 10300', correct depth -16', close EDC and RIH to TD Tag TD on depth at 10792' and start drilling, Gamma came in at 10780' confirming TOWS at 10775' where we set it. Free spin = 4750psi Circ Pressure = 5193psi. In Rate = 1.90 bpm Out Rate = 1.88 bpm. ECD = 12.15 at the window. MW In = 8.63 ppg MW Out = 8.79 ppg. ROP = 50-60 fph. IAP = 614psi OAP = 0psi 100' wiper trip from 10958'. Clean pass up and down. 1.8 / 1.8 bpm at 4900 psi FS. MW in = 8.64 ppg MW out = 8.81 ppg. ECD = 12.29 ppg at window. 100' wiper trip from 11100'. Clean pass up and down. Drill to 11170' Continue drilling from 11170'. ROP is 60 - 80 ft/hr with 2-3K DWOB. ECD at window is 12.12 ppg with WHP = 995 psi. Pann = 4498 psi. 1.8 / 1.8 bpm at 5220 psi drilling. Cross fault at 11194' stall and GR change. Pump 5 bbls lo / hi vis sweeps followed by new mud. Drill to 11250'. Swap to new mud without black products. Wiper trip from 11250'. Pull through window and jog, then open EDC, pump B/U at 2..4 bpm. Tie-in depth, correct +3'. Close EDC and log RA tie-in. Continue RIH to bottom. Drill from 11250'. ECD at window is 12.08 ppg with WHP =1078 psi. Pann = 4484 psi. 1.85 / 1.85 bpm at 5000 psi drilling. 100' wiper at 11400', clean pass up and down. At 11420 pump 5 bbls lo / hi vis sweeps. Drill to 11500'. 1/13/2022 Continue drilling ahead at 11543'. 1.8 / 1.8 bpm at 4500 psi FS. MW in = 8.64 ppg MW out = 8.80 ppg. ECD = 12.2 ppg at window 11700' - Drilled 450' POOH chasing pills to the window, at the window, looks like we have a cuttings bed building up in the 3-1/4" liner above the window. Pulled heavy pulling through the window and 10-15 past the TOW where the weight started dropping off. Wash down from 10710' to 10760' 10' above the window then open the EDC and PU to 10430' above the TOL, pump a bottoms up while tie then RIH to the WS and wash across the WS with an open EDC until clean, clean pass across the WS. PUH above the window was clean, close the EDC and RIH Back on bottom drilling at 11700' in the A3 Sand. 1.85 / 1.88 bpm at 4550 psi FS. MW in = 8.64 ppg MW out = 8.82 ppg. ECD = 12.23 ppg at window Drilled out of the A3 at 11730' and into the B-Shale, dropped down but are still drilling B-Shale at 11900'. Plan forward is to drop down aggressively at 80° to find the top and bottom of the A3 then condition the OH and tubing for a billet. TD @ 12134' Confirm A2. Clean and condition hole from TD @ 12134' to window. Confirm billet setting depth of ~ 11500' - 11550' clean with three passes. Had to drop pump rate to 1 bpm to work back through fault area. Pump Hi/Lo sweep off bottom for wiper trip to window. Open EDC @ window and jet window clean. 2.43 bpm, 5316 psi. POOH jetting tubing @ max rate to 2000'. RIH f/2000' pumping 2.4 bpm, 5312 psi. Tie in and correct +4'. Jet window @ 2.42 bpm, 5108 psi. Pump final Hi/Lo vis sweep. Dry drift through window from 10751' - 10790' . Clean drift. POOH pumping max rate. 2.40 in/1.96 out. 5160 psi. OOH. PJSM and begin pressure un-deploying lateral BHA. 1/14/2022 BHA OOH, LD tools bit grade = 1-1, prep to MU the billet BHA, set billet single slip to HS and pressure deploy. 1502 Hardline rubber failed at the reel manifold. Knock hardline loose to inspect rubber. Rubber is split, replace and PT. Good PT, finish PD. Billet BHA deployed, RIH. Log tie in, correct depth -14.5' RIH, passed through window clean, saw some WOB and annular pressure spike going through the fault at 11194'. Ran past set depth, PU WT = 35k, RIH to 11546.77' placing the TOB at 11535'. PU 32k, stop and set billet. Billet setting tool sheared at at 4709psi WOB increased to 3.2k, set down 4k, good set, PU and we are released, POOH OOH, pressure un-deploy the Billet setting BHA. Replace motherboard card in pump #2. Raise HZ limits for strokes to raise output on both pumps. Test both pumps strokes and faults. No issues noted. Pressure test SR manifold to 7200 psi. Test good. Billet setting tool recovered. Pressure deploy lateral drilling BHA #6. 2-3/8" xtreme motor with 2.70' x 3.0" Hycalog SRFX3408M bi-center bit. RIH with lateral drilling BHA #6 while maintaining ECD schedule. Log Tie In pass. Correct -15'. Continue RIH to billet depth. Tag billet while pumping min rate @ 11536'. PUH and bring pumps on full rate. 1.89 bpm Time mill/sidetrack off billet @ 1' per hour from 11535'. TF = 150 LOHS. 1.90 BPM, 4955 psi. Continue sidetracking off of billet. Stall at 11541'. PUH and attempt to resume sidetrack. Setting weight down with coil. No WOB noted on BHA. Continue working coil. Stacking 10k down @ 11176'. Well Name: Field: County/State: MP L-06A Milne Point Hilcorp Energy Company Composite Report , Alaska 50-029-22003-01-00API #: RIH to 11546.77' placing the TOB at 11535'. 1/15/2022 Not making any headway coming up, the billet cuttings just keeps trying to pack off around the BHA and the pressure surges are not doing the B-Shale any favors. Reduce pump rate and see if we can make our way up to the window, clean up the tubing then RIH to clean out the OH from the top down Made it up to the window without any issues, clean up the tubing then clean up the OH from the top down in 50' increments to 11350'. Made it down to 10931' then set down WT, PU and try to work down, still taking WT, reduce rate to 1bpm and RIH past, online and PUH to clean up obstruction Made it down to 11370' had to clean up several area starting at 10850, make a final pass up to the cased hole, above the window pump a bottoms up to clean out Billet Aluminum cuttings then go back to drilling Back on bottom drilling at 11541'. 1.83 bpm In/1.89 bpm Out. MW In = 8.69ppg/MW Out = 8.87ppg. 5530 psi circ. 1-2.25k WOB. Continue drilling ahead from 11800'. 1.85 bpm In/1.89 bpm Out. MW In = 8.69ppg/MW Out = 8.87ppg. 5764 psi circ. 1-2.25k WOB. Drill to 12,000'. Wiper trip to window - overpull noted at 11140'. 1.87 bpm In/1.84 bpm Out. MW In = 8.71ppg/MW Out = 8.89ppg. 5366 psi circ. Pull through window and open EDC. 2.73 bpm IN/2.76 bpm Out. 6200 psi circ. Back on bottom drilling at 12,002'. 1.84 bpm In/1.83 bpm Out. MW In = 8.73ppg/MW Out = 8.87ppg. 5485 psi circ. 1-2.25k WOB. 1/16/2022 Continue drilling as per plan from 12137'. Rate in = 1.86 bpm Rate Out = 1.84 bpm. MW In = 8.71 ppg, MW Out = 8.91 ppg. Circ PSI = 5520 psi, WOB = 1.5k - 2.0k. Drilled to 12450', perform wiper trip to the window. Jog below the window then pull through, open EDC and was across the WS Tray. PUH to the top of the 3- 1/4" liner. RIH at max rate and log tie in, correct depth +2', close EDC and RIH Drill ahead from 12513'. Rate In = 1.85 bpm Rate Out = 1.82 bpm. MW In = 8.60 ppg MW Out = 8.73 ppg. Circ = 5522 psi, WOB = 1.5k - 2.2k. Drilling ahead at 12620' and encountered 100% losses. PU and notify Foreman and Engineer. Drill ahead to 12671' with continuing losses. Wiper to window while maintaining ECD. Fluid level appears to be at surface. Drop rate to 1 bpm and have .75 bpm returns Circulate in cased hole while waiting on additional fluid. Rate In = .96 bpm Rate Out = .75 bpm. MW In = 8.6p ppg MW Out = 8.74 ppg. Circ = 2416 psi. Log Tie In - correct +1'. 1/17/2022 Geo's have called TD, clean out OH for plug set above thief zone Trip to 12600 was clean in and out. Pull through window, open EDC and jet WS tray then POOH cleaning out the 4-1/2" tubing at a reduced pulling speed for losses OOH, start pressure un-deploy drilling BHA. Call out BOT to bring CMT Retainer to location BHA OOH, bit grade = 1-1. Load BOT CMT Retainer on the rig and prep to MU the BHA. Function test BOPE RU and pressure deploy BHA# 7, Baker 2.13" OH retainer. RIH. Log Tie-In from 10,300' Correct -15.5'. Close EDC and RIH through OH. Ensure valving is open at surface on reel(ball on seat to activate plug setting sequence) Log plug setting depth and correct +6'. Pull up to setting depth and set plug @ 12505'. Pressure up in 1000 psi increments per Baker rep to set plug. Plug appears to set ~ 3000psi. Able to inject through plug @ .5 bpm and 1800 psi. Set down 2k and confirm set. PUH and shear off plug @ 42k up weight. Pump .5 bpm, 1.0bpm, 1.5 bpm and confirm returns are 1:1. Good plug set. Prepare to pump liner running pill. Dust up KWF from 12.1 ppg to 12.2 ppg. Mix Alpine glass beads in liner running pill Begin pumping 20 bbl liner running pill with Alpine glass beads. In Rate 1.5 bpm Out Rate 1.5 bpm. Lay in liner running pill from 12495' @ .3 bpm and 30 fpm. Lay in 12.2 KWF from 10970'. POOH laying in and pumping 80%. 1/18/2022 Continue POOH displacing well to 12.2ppg Formate at 4700' with the CMT Retainer setting BHA, OOH, flow check well for 10 min, good no flow, circ across top to check for losses, no losses, LD the setting BHA Prep rig floor to run liner Hold a PJSM to MU Liner, verify safety joint, hand slips, dog collar, joint count, fill hole every 10 joints to verify the hole is staying full. Perform KWT Drill with Safety Joint. MU and RIH with liner BHA. RIH through window without issue. Work liner through the following depths: 11725', 11770', 11781'. Hard bottom at 12459' without any further progress. Log tie-in pass. Log GR and correct -7'. Log CCL and find tubing on depth as well. Continue to work liner to bottom from 12452.9' to 12492'. Repeat tag and confirm hard tag on liner top with deployment sleeve. TOL = 10424.9'. Pump off liner and begin swapping well to 1% KCL. Pump 20 bbl Hi-vis spacer and swap well bore over to 1% KCL. Recover 12.2 KWF at surface. POOH. Stop at 2800' for freeze protect. Wait on LRS(Pump truck needed on ASR). Resume pumping diesel freeze protect. 1/19/2022 Continue waiting for LRS pump truck and diesel. Line up and pressure test standing iron to reel. POOH pumping 55 bbls of diesel and freeze protect well from 2800' md. OOH OOH - pressure un-deploy liner running BHA. Begin RDMO. RU Top drive to BOP stack. Remove MPD line and secure. RU and PT tree with MeOH to 3500 psi. Good test ND BOP's. Clean and organize cellar. Blow down water and RD Putz Install tree cap. Test to 4000 psi with MeOH. Good test. Chain off and secure reel. Disconnect flowline. Disconnect tiger tank return line. 1/20/2022 Rig released @ 02:30. Secure cellar and BOP's. Check final torque on tree flange connections. Bleed down Koomey. Blow down steam lines. RIH with liner BHA. RIH through window without issue. Work liner through the following depths: 11725', 11770', 11781'. Hard bottom at 12459' without any further progress. Log tie-in pass. Log GR and correct -7'. Log CCL and find tubing on depth as well. Continue to work liner to bottom from 12452.9' to 12492'. Repeat tag and confirm hard tag on liner top with deployment sleeve. TOL = 10424.9'. In Rate 1.5 bpm Out Rate 1.5 bpm. Drilling ahead at 12620' and encountered 100% losses. Pull up to setting depth and set plug @ 12505'. Well Name Rig API Number Well Permit Number Start Date End Date MP L-06A Slickline 50-029-22003-01-00 221-011 1/23/2022 1/24/2022 No operations to report. WELL S/I ON ARRIVAL, DSO NOTIFIED, PT PCE 250L/2500H*** (post rig). RAN KJ, 3'x1-1/2" STEM, 2-7/8" BLB, 1.8" GAUGE RING & BRUSH & FLUSH NIP IN PACKER W/ LRS ASSIST @ 10,451' SLM, PUMPED TOTAL OF 15bbls 60/40 CREISEL. SET 2-7/8" XX PLUG (oal: 23") IN X-NIP IN PACKER @ 10,449' SLM, GOOD PULL TEST, SHEARED OFF CLEAN, ALL PINS ON X-LINE RECOVERED. LRS ATTEMPTED TO PRESSURE TEST TUBING FROM 1500 TO 2500psi, LOSE 700psi IN 4min, MADE 4 ATTEMPTS W/ SAME RESULTS, TAKES ~7/10ths bbls TO PRESSURE UP EACH TIME. WELL S/I ON DEPARTURE, DSO NOTIFIED. 1/25/2022 - Tuesday 1/23/2022 - Sunday WELL S/I ON ARRIVAL, DSO NOTIFIED, PT PCE 250L/2500H (post rig). DRIFTED TUBING W/ 4-1/2" DKBP W/ STINGER (oal: 115"), TOOLS TRY TO S/D @ 2,600' SLM, PULL BACK THROUGH W/ 350lb OVERPULL, S/D ON DEPLOYMENT SLEEVE @ 10,443' SLM, HIT DOWN 10 TIMES & DROP 3' DOWN TO 10,446' SLM, ALL TATTLE TALE PINS SHEARED, CLEAR RING ON STINGER BRASS. RAN 2.5" DPU & BAKER FLOW GUARD TOP LINER PACKER (30k shear release, 8pins @ 11,320lbs, oal: 131") & S/D IN DEPOLYMENT SLEEVE @ 10,451' SLM, HIT DOWN 20 TIMES W/ NO MOVEMENT, DPU STROKED @ 15:40, P/U CLEAN, GOOD SET. PRESSURED UP TUBING FROM 1500 TO 2500psi W/ TRIPLEX, PRESSURE FALLS TO 1700psi IN 2 - 3 MIN, MADE 3 ATTEMPTS W/ SAME RESULTS, LRS PRESSURED UP TUBING FROM 1500 TO 2500psi 2 TIMES, LOST 703psi IN 4min ON FIRST TEST & 799psi ON SECOND. RAN 5'x1-7/8" STEM, 2.1" CENT, 11" EXT, 2-7/8" X-EQ PRONG & EQ PLUG IN PACKER @ 10,450' SLM, FAINT RING ON EQ PRONG, TATTLE TAIL PIN SHEARED. PULLED 2-7/8" XX PLUG FROM PACKER @ 10,449' SLM, ALL PACKING & PINS RECOVERED. WELL S/I ON DEPARTURE, DSO NOTIFIED. CONTINUE ON 1-24-22 WSR. 1/24/2022 - Monday Hilcorp Alaska, LLC Weekly Operations Summary Vert Uncert 1sd[ft]0.000.00Start MDEnd MDSurvey Date[ft][ft]56.00 10500.0003/19/2110500.00 10700.6806/01/2110700.68 10760.1306/07/2110760.13 11520.4001/13/2211520.4012671.0001/19/22MDInclinationAzimuthTVDTVDSSNorthEastGrid EastGrid NorthLatitudeLongitudeDLSToolfaceBuild RateTurn RateVert SectMajor SemiMinor SemiVert SemiMinor AzimComments[ft][°][°][ft][ft][ft][ft][US ft][US ft][°/100ft][°][°/100ft][°/100ft][ft][ft][ft][ft][°]0.00 0.00 181.10 0.00 -56.00 0.00 0.00 544919.97 6031350.91 70°29'47.4683"N149°37'57.6454"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.0056.00 0.00 181.10 56.00 0.00 0.00 0.00 544919.97 6031350.91 70°29'47.4683"N149°37'57.6454"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00100.00 0.35 181.10 100.00 44.00 -0.13 0.00 544919.97 6031350.78 70°29'47.4670"N149°37'57.6455"W0.80 -162.706 0.80 0.00 -0.08 0.13 0.08 1.32 271.10200.00 0.28 176.58 200.00 144.00 -0.68 0.01 544919.98 6031350.23 70°29'47.4616"N149°37'57.6452"W0.07 85.94 -0.07 -4.52 -0.39 0.41 0.25 1.33 89.83300.00 0.30 193.93 300.00 244.00 -1.18 -0.04 544919.93 6031349.73 70°29'47.4567"N149°37'57.6467"W0.09 -178.325 0.02 17.35 -0.72 0.67 0.43 1.36 271.74400.00 0.23 193.42 400.00 344.00 -1.63 -0.15 544919.83 6031349.28 70°29'47.4523"N149°37'57.6499"W0.07 154.392 -0.07 -0.51 -1.07 0.93 0.60 1.40 275.06500.00 0.15 209.32 500.00 444.00 -1.94 -0.26 544919.72 6031348.97 70°29'47.4492"N149°37'57.6531"W0.10 -137.834 -0.08 15.90 -1.34 1.19 0.78 1.44 278.67600.00 0.13 122.25 600.00 544.00 -2.12 -0.23 544919.75 6031348.79 70°29'47.4475"N149°37'57.6522"W0.19 -82.213 -0.02 -87.07 -1.42 1.41 0.95 1.50 95.58700.00 2.77 42.70 699.96 643.96 -0.40 1.50 544921.48 6031350.52 70°29'47.4644"N149°37'57.6011"W2.75 1.339 2.64 -79.55 0.99 1.63 1.22 1.56 102.09800.00 4.82 43.27 799.73 743.73 4.44 6.02 544925.97 6031355.38 70°29'47.5119"N149°37'57.4681"W2.05 -2.357 2.05 0.57 7.48 2.17 1.47 1.63 124.33900.00 7.38 42.45 899.16 843.16 12.24 13.24 544933.13 6031363.22 70°29'47.5886"N149°37'57.2557"W2.56 16.469 2.56 -0.82 17.89 2.57 1.65 1.71 129.531000.00 9.12 45.67 998.12 942.12 22.51 23.24 544943.07 6031373.56 70°29'47.6897"N149°37'56.9612"W1.80 8.141 1.74 3.22 32.00 2.99 1.83 1.80 132.001100.00 11.95 47.62 1096.42 1040.42 35.03 36.56 544956.32 6031386.16 70°29'47.8128"N149°37'56.5692"W2.85 4.541 2.83 1.95 50.12 3.31 2.03 1.90 134.041200.00 13.85 48.25 1193.89 1137.89 49.98 53.14 544972.80 6031401.21 70°29'47.9599"N149°37'56.0812"W1.91 10.087 1.90 0.63 72.30 3.73 2.25 2.01 135.821300.00 15.85 49.55 1290.55 1234.55 66.81 72.47 544992.02 6031418.15 70°29'48.1254"N149°37'55.5124"W2.03 6.514 2.00 1.30 97.81 4.00 2.46 2.13 136.921400.00 20.53 51.07 1385.53 1329.53 86.70 96.51 545015.95 6031438.19 70°29'48.3210"N149°37'54.8046"W4.70 58.894 4.68 1.52 128.94 4.43 2.72 2.29 138.251500.00 20.78 52.22 1479.10 1423.10 108.59 124.17 545043.47 6031460.24 70°29'48.5362"N149°37'53.9904"W0.48 -0.475 0.25 1.15 164.18 5.06 3.00 2.54 139.471600.00 21.67 52.20 1572.32 1516.32 130.77 152.78 545071.94 6031482.59 70°29'48.7544"N149°37'53.1482"W0.89 -13.085 0.89 -0.02 200.35 5.20 3.29 2.64 139.901700.00 25.33 50.22 1664.01 1608.01 155.78 183.82 545102.83 6031507.79 70°29'49.0004"N149°37'52.2345"W3.74 8.889 3.66 -1.98 240.15 5.43 3.60 2.79 320.351800.00 26.62 50.67 1753.90 1697.90 183.67 217.59 545136.43 6031535.88 70°29'49.2746"N149°37'51.2405"W1.30 3.182 1.29 0.45 283.84 5.83 3.94 3.02 320.721900.00 27.97 50.83 1842.77 1786.77 212.68 253.10 545171.76 6031565.10 70°29'49.5600"N149°37'50.1951"W1.35 -6.017 1.35 0.16 329.60 6.00 4.30 3.15 321.132000.00 30.37 50.33 1930.08 1874.08 243.64 290.75 545209.21 6031596.28 70°29'49.8644"N149°37'49.0870"W2.41 1.046 2.40 -0.50 378.23 6.20 4.68 3.31 321.592100.00 35.10 50.48 2014.17 1958.17 278.09 332.41 545250.66 6031630.98 70°29'50.2032"N149°37'47.8607"W4.73 19.576 4.73 0.15 432.16 6.53 5.11 3.58 321.972200.00 37.18 51.70 2094.93 2038.93 315.12 378.30 545296.32 6031668.28 70°29'50.5673"N149°37'46.5096"W2.20 2.799 2.08 1.22 491.03 6.97 5.58 3.97 322.192300.00 39.80 51.90 2173.19 2117.19 353.60 427.21 545344.99 6031707.05 70°29'50.9457"N149°37'45.0699"W2.62 4.17 2.62 0.20 553.20 7.18 6.08 4.18 322.822400.00 42.10 52.15 2248.72 2192.72 393.92 478.87 545396.41 6031747.68 70°29'51.3423"N149°37'43.5491"W2.31 -14.857 2.30 0.25 618.68 7.40 6.61 4.42 323.802500.00 44.90 51.10 2321.25 2265.25 436.66 532.82 545450.09 6031790.74 70°29'51.7626"N149°37'41.9610"W2.89 -8.824 2.80 -1.05 687.43 7.60 7.16 4.66 326.462600.00 47.12 50.63 2390.70 2334.70 482.07 588.62 545505.61 6031836.48 70°29'52.2091"N149°37'40.3183"W2.25 2.959 2.22 -0.47 759.23 7.83 7.72 4.93 351.052700.00 49.17 50.77 2457.42 2401.42 529.25 646.26 545562.95 6031884.00 70°29'52.6730"N149°37'38.6216"W2.05 8.665 2.05 0.14 833.55 8.37 7.97 5.16 43.792800.00 51.27 51.18 2521.40 2465.40 577.63 705.96 545622.35 6031932.74 70°29'53.1488"N149°37'36.8640"W2.12 3.267 2.10 0.41 910.26 9.01 8.14 5.40 47.562900.00 53.67 51.35 2582.31 2526.31 627.25 767.82 545683.90 6031982.72 70°29'53.6367"N149°37'35.0430"W2.40 118.796 2.40 0.17 989.44 9.67 8.30 5.65 48.803000.00 53.32 52.15 2641.80 2585.80 677.01 830.94 545746.72 6032032.86 70°29'54.1260"N149°37'33.1847"W0.73 144.952 -0.35 0.80 1069.73 10.35 8.45 5.90 49.493100.00 52.53 52.85 2702.09 2646.09 725.58 894.23 545809.71 6032081.81 70°29'54.6037"N149°37'31.3212"W0.97 108.521 -0.79 0.70 1149.47 11.04 8.58 6.07 50.013200.00 52.30 53.73 2763.08 2707.08 772.95 957.76 545872.95 6032129.56 70°29'55.0694"N149°37'29.4510"W0.73 35.182 -0.23 0.88 1228.70 11.73 8.71 6.25 50.443300.00 53.20 54.52 2823.61 2767.61 819.59 1022.26 545937.16 6032176.58 70°29'55.5281"N149°37'27.5520"W1.10 84.239 0.90 0.79 1308.30 12.43 8.85 6.44 50.843400.00 53.27 55.35 2883.46 2827.46 865.62 1087.83 546002.44 6032223.00 70°29'55.9806"N149°37'25.6216"W0.67 47.746 0.07 0.83 1388.40 13.14 8.99 6.64 51.213500.00 53.80 56.07 2942.90 2886.90 910.92 1154.27 546068.60 6032268.70 70°29'56.4261"N149°37'23.6654"W0.78 135.812 0.53 0.72 1468.80 13.86 9.13 6.83 51.583600.00 53.47 56.47 3002.19 2946.19 955.64 1221.24 546135.29 6032313.81 70°29'56.8657"N149°37'21.6937"W0.46 -84.507 -0.33 0.40 1549.29 14.58 9.27 7.03 51.923700.00 53.60 54.92 3061.63 3005.63 1000.96 1287.67 546201.44 6032359.53 70°29'57.3114"N149°37'19.7379"W1.25 112.21 0.13 -1.55 1629.68 15.30 9.42 7.23 52.173800.00 53.45 55.38 3121.07 3065.07 1046.91 1353.66 546267.14 6032405.88 70°29'57.7632"N149°37'17.7950"W0.40 17.949 -0.15 0.46 1710.09 16.03 9.56 7.43 52.343900.00 54.43 55.77 3179.94 3123.94 1092.61 1420.34 546333.54 6032451.97 70°29'58.2125"N149°37'15.8317"W1.03 -88.551 0.98 0.39 1790.91 16.77 9.71 7.65 52.524000.00 54.50 53.45 3238.06 3182.06 1139.73 1486.67 546399.58 6032499.49 70°29'58.6758"N149°37'13.8787"W1.89 -42.959 0.07 -2.32 1872.28 17.51 9.86 7.87 52.634100.00 55.28 52.57 3295.58 3239.58 1188.95 1552.01 546464.61 6032549.10 70°29'59.1597"N149°37'11.9549"W1.06 91.286 0.78 -0.88 1954.05 18.27 10.01 8.09 52.644200.00 55.27 53.20 3352.54 3296.54 1238.55 1617.55 546529.85 6032599.09 70°29'59.6473"N149°37'10.0251"W0.52 75.469 -0.01 0.63 2036.21 19.03 10.17 8.31 52.644300.0055.4554.033409.383353.381287.351683.79546595.786032648.2870°30'0.1272"N149°37'8.0748"W0.7133.4110.180.832118.4819.8010.328.5352.68WellboreLog Name / CommentPositional Uncertainty ModelBH CoilTrak (2019) (Standard) MPU L-06A CoilTrak<11520.40-12671> MPU L-06ABH CoilTrak (2019) (Standard) MPU L-06APB2 CoilTrak <10710-11886> MPU L-06APB2BH CoilTrak (2019) (Standard) MPU L-06APB3 CoilTrak<10778-12133> MPU L-06APB3BH Generic gyro - continuous (Standard) L-06 Gyro CT <0-10832.1> MPU L-06BH CoilTrak (2019) (Standard) MPU L-06APB1 CoilTrak <10562-11440> MPU L-06APB1149°37'57.6454"W149°37'57.6454"W149°31'31.8215"WHoriz Uncert 1sd[ft]0.000.00[US ft]6031350.916031350.916027347.71Latitude70°29'47.4683"N70°29'47.4683"N70°29'7.2002"N[ft]0.00Grid East[US ft]544919.97544919.97558058.04Slot LocationFacility Reference PtField Reference PtLocal North[ft]0.0054.40°included50-029-22003-01Local East Grid North LongitudeSection AzimuthSurface Position UncertaintyAPI#NAD27 / TM Alaska SP, Zone 4 (5004), US feetTrue0.9999020.35 EastSlotRig on MPU L-06 (RT)Rig on MPU L-06 (RT)Mean Sea Level56.00 ft56.00 ft56.00 ftE 0.00 ftN 0.00 ftMagnetic North is 15.36 degrees East of True North2.00Std DevWA_ANC_DefnProjection SystemNorth ReferenceScaleConvergence at SlotHorizontal Reference PointVertical Reference PointMD Reference PointField Vertical ReferenceRig on MPU L-06 (RT) To Facility Vertical DatumRig on MPU L-06 (RT) To Mean Sea LevelRig on MPU L-06 (RT) to Ground Level at Slot (MPU L-06)Section Origin XSection Origin YDeclinationEllipse Confidence LimitDatabase01/19/22 at 16:08 using WellArchitect 6.0Hilcorp Alaska, LLCNorth Slope, AlaskaMilne PointMPU L PadMPU L-06MPU L-06AMPU L-06AMPU L-06A01/19/2022MPU L-06APB3 at 11520.40 MDUlricardMinimum curvatureWellpathWellbore last revised Sidetrack fromUserCalculation methodFieldFacilitySlotWellWellboreActual Wellpath Geographic Report - including Position UncertaintyReport by Baker HughesOperatorAreaPage 1 of 3 4400.00 56.08 54.53 3465.64 3409.64 1335.62 1750.91 546662.60 6032696.95 70°30'0.6017"N 149°37'6.0985"W 0.75 10.722 0.63 0.50 2201.15 20.58 10.478.7652.754500.00 57.28 54.80 3520.57 3464.57 1383.94 1819.07 546730.47 6032745.68 70°30'1.0768"N 149°37'4.0913"W 1.22 72.735 1.20 0.27 2284.71 21.37 10.639.0052.834590.00 57.46 55.48 3569.10 3513.10 1427.27 1881.27 546792.39 6032789.38 70°30'1.5027"N 149°37'2.2599"W 0.67 71.298 0.20 0.76 2360.50 22.09 10.779.2252.924600.00 57.48 55.55 3574.48 3518.48 1432.04 1888.22 546799.31 6032794.19 70°30'1.5496"N 149°37'2.0553"W 0.62 168.496 0.20 0.70 2368.93 22.17 10.78 9.24 52.934700.00 53.23 56.63 3631.32 3575.32 1477.94 1956.47 546867.27 6032840.50 70°30'2.0009"N 149°37'0.0457"W 4.34 158.363 -4.25 1.08 2451.14 22.96 10.97 9.52 53.054800.00 52.55 56.97 3691.65 3635.65 1521.61 2023.19 546933.73 6032884.56 70°30'2.4302"N149°36'58.0808"W0.73 102.009 -0.68 0.34 2530.82 23.73 11.21 9.90 53.174900.00 52.47 57.45 3752.51 3696.51 1564.58 2089.90 547000.17 6032927.93 70°30'2.8526"N149°36'56.1166"W0.39 105.766 -0.08 0.48 2610.07 24.50 11.39 10.13 53.315000.00 52.32 58.13 3813.54 3757.54 1606.81 2156.93 547066.93 6032970.56 70°30'3.2677"N149°36'54.1429"W0.56 135.231 -0.15 0.68 2689.16 25.27 11.56 10.36 53.475100.00 51.62 59.02 3875.14 3819.14 1647.88 2224.14 547133.89 6033012.03 70°30'3.6714"N149°36'52.1637"W0.99 -14.214 -0.70 0.89 2767.71 26.04 11.74 10.59 53.635200.00 52.72 58.67 3936.47 3880.47 1688.74 2291.73 547201.22 6033053.30 70°30'4.0731"N149°36'50.1734"W1.13 145.983 1.10 -0.35 2846.46 26.82 11.92 10.82 53.805300.00 51.70 59.55 3997.75 3941.75 1729.31 2359.54 547268.78 6033094.28 70°30'4.4719"N149°36'48.1765"W1.23 -53.137 -1.02 0.88 2925.22 27.60 12.10 11.07 53.975400.00 54.82 54.63 4057.59 4001.59 1772.88 2426.74 547335.71 6033138.25 70°30'4.9002"N149°36'46.1978"W5.03 -38.015 3.12 -4.92 3005.22 28.40 12.30 11.33 54.065500.00 55.70 53.80 4114.57 4058.57 1820.94 2493.39 547402.07 6033186.70 70°30'5.3726"N149°36'44.2348"W1.11 163.659 0.88 -0.83 3087.39 29.23 12.50 11.64 54.065600.00 54.18 54.35 4172.01 4116.01 1868.96 2559.67 547468.05 6033235.12 70°30'5.8447"N149°36'42.2828"W1.59 -4.215 -1.52 0.55 3169.24 30.05 12.68 11.89 54.065700.00 55.07 54.27 4229.91 4173.91 1916.53 2625.90 547533.98 6033283.08 70°30'6.3123"N149°36'40.3326"W0.89 32.773 0.89 -0.08 3250.78 30.88 12.87 12.15 54.065800.00 55.30 54.45 4287.00 4231.00 1964.37 2692.62 547600.40 6033331.32 70°30'6.7825"N149°36'38.3676"W0.27 128.727 0.23 0.18 3332.88 31.71 13.05 12.40 54.075900.00 54.65 55.45 4344.39 4288.39 2011.40 2759.66 547667.15 6033378.75 70°30'7.2448"N149°36'36.3934"W1.05 146.873 -0.65 1.00 3414.76 32.55 13.23 12.64 54.096000.00 53.75 56.18 4402.89 4346.89 2056.97 2826.75 547733.95 6033424.72 70°30'7.6928"N149°36'34.4175"W1.08 149.653 -0.90 0.73 3495.84 33.39 13.41 12.88 54.146100.00 52.88 56.82 4462.63 4406.63 2101.24 2893.62 547800.55 6033469.38 70°30'8.1278"N149°36'32.4482"W1.01 5.099 -0.87 0.64 3575.98 34.22 13.60 13.13 54.206200.00 53.42 56.88 4522.60 4466.60 2145.00 2960.61 547867.27 6033513.54 70°30'8.5579"N149°36'30.4751"W0.54 -12.321 0.54 0.06 3655.93 35.06 13.79 13.38 54.276300.00 54.20 56.67 4581.65 4525.65 2189.22 3028.12 547934.51 6033558.17 70°30'8.9925"N149°36'28.4868"W0.80 -11.531 0.78 -0.21 3736.56 35.90 13.98 13.62 54.336400.00 54.68 56.55 4639.80 4583.80 2233.99 3096.05 548002.15 6033603.34 70°30'9.4326"N149°36'26.4863"W0.49 5.577 0.48 -0.12 3817.85 36.76 14.17 13.87 54.396500.00 55.10 56.60 4697.32 4641.32 2279.05 3164.32 548070.15 6033648.81 70°30'9.8754"N149°36'24.4755"W0.42 -34.423 0.42 0.05 3899.60 37.63 14.36 14.12 54.446600.00 55.28 56.45 4754.40 4698.40 2324.34 3232.81 548138.35 6033694.51 70°30'10.3205"N149°36'22.4584"W0.22 -14.781 0.18 -0.15 3981.65 38.50 14.54 14.37 54.496700.00 55.75 56.30 4811.02 4755.02 2369.98 3301.44 548206.70 6033740.56 70°30'10.7691"N149°36'20.4370"W0.49 -117.525 0.47 -0.15 4064.03 39.38 14.73 14.62 54.546800.00 55.60 55.95 4867.41 4811.41 2416.01 3370.01 548274.98 6033787.00 70°30'11.2215"N149°36'18.4174"W0.33 -174.333 -0.15 -0.35 4146.57 40.27 14.92 14.87 54.576900.00 54.13 55.77 4924.96 4868.96 2461.91 3437.69 548342.38 6033833.30 70°30'11.6726"N149°36'16.4239"W1.48 -12.262 -1.47 -0.18 4228.32 41.16 15.11 15.13 54.607000.00 54.58 55.65 4983.24 4927.24 2507.69 3504.83 548409.24 6033879.48 70°30'12.1225"N149°36'14.4463"W0.46 -1.594 0.45 -0.12 4309.57 42.05 15.31 15.39 54.637100.00 55.17 55.63 5040.77 4984.77 2553.85 3572.35 548476.47 6033926.04 70°30'12.5762"N149°36'12.4576"W0.59 -8.62 0.59 -0.02 4391.34 42.94 15.50 15.64 54.657200.00 55.77 55.52 5097.46 5041.46 2600.42 3640.31 548544.13 6033973.02 70°30'13.0339"N149°36'10.4560"W0.61 -4.754 0.60 -0.11 4473.70 43.85 15.70 15.90 54.677299.00 56.27 55.47 5152.79 5096.79 2646.93 3707.96 548611.50 6034019.93 70°30'13.4910"N 149°36'8.4633"W 0.51 0 0.51 -0.05 4555.78 44.76 15.89 16.16 54.697300.00 56.28 55.47 5153.34 5097.34 2647.40 3708.64 548612.18 6034020.41 70°30'13.4956"N 149°36'8.4432"W 1.00 -171.588 1.00 0.00 4556.61 44.77 15.89 16.16 54.697400.00 54.68 55.18 5210.01 5154.01 2694.27 3776.40 548679.65 6034067.68 70°30'13.9562"N 149°36'6.4473"W 1.62 -6.814 -1.60 -0.29 4638.99 45.69 16.09 16.42 54.707500.00 55.23 55.10 5267.43 5211.43 2741.07 3843.58 548746.53 6034114.88 70°30'14.4161"N 149°36'4.4685"W 0.55 1.482 0.55 -0.08 4720.86 46.61 16.29 16.69 54.717600.00 55.87 55.12 5324.00 5268.00 2788.23 3911.22 548813.88 6034162.45 70°30'14.8796"N 149°36'2.4761"W 0.64 -8.281 0.64 0.02 4803.31 47.54 16.49 16.94 54.727700.00 56.27 55.05 5379.82 5323.82 2835.72 3979.26 548881.62 6034210.34 70°30'15.3463"N 149°36'0.4719"W 0.40 -23.961 0.40 -0.07 4886.28 48.48 16.68 17.20 54.737800.00 56.42 54.97 5435.24 5379.24 2883.46 4047.45 548949.52 6034258.48 70°30'15.8154"N149°35'58.4631"W0.16 -24.196 0.15 -0.08 4969.51 49.43 16.88 17.46 54.737900.00 56.55 54.90 5490.45 5434.45 2931.35 4115.69 549017.46 6034306.79 70°30'16.2861"N149°35'56.4529"W0.14 -173.977 0.13 -0.07 5052.88 50.39 17.07 17.72 54.748000.00 56.00 54.83 5545.97 5489.97 2979.22 4183.71 549085.18 6034355.06 70°30'16.7565"N149°35'54.4492"W0.55 -19.639 -0.55 -0.07 5136.05 51.35 17.27 17.98 54.748100.00 56.35 54.68 5601.64 5545.64 3027.16 4251.55 549152.73 6034403.40 70°30'17.2276"N149°35'52.4506"W0.37 -22.062 0.35 -0.15 5219.12 52.31 17.47 18.25 54.748200.00 56.68 54.52 5656.81 5600.81 3075.47 4319.54 549220.42 6034452.12 70°30'17.7023"N149°35'50.4478"W0.36 -122.642 0.33 -0.16 5302.53 53.28 17.67 18.51 54.748300.00 56.10 53.42 5712.17 5656.17 3124.46 4386.89 549287.46 6034501.51 70°30'18.1837"N149°35'48.4637"W1.08 -35.13 -0.58 -1.10 5385.80 54.26 17.87 18.77 54.728400.00 56.42 53.15 5767.71 5711.71 3174.17 4453.55 549353.81 6034551.62 70°30'18.6722"N149°35'46.4999"W0.39 180 0.32 -0.27 5468.94 55.24 18.07 19.04 54.708500.00 54.77 53.15 5824.21 5768.21 3223.65 4519.57 549419.53 6034601.49 70°30'19.1584"N149°35'44.5549"W1.65 -11.246 -1.65 0.00 5551.43 56.22 18.27 19.30 54.678600.00 55.10 53.07 5881.66 5825.66 3272.78 4585.03 549484.69 6034651.01 70°30'19.6412"N149°35'42.6263"W0.34 9.679 0.33 -0.08 5633.26 57.20 18.48 19.57 54.648700.00 55.73 53.20 5938.42 5882.42 3322.17 4650.90 549550.25 6034700.80 70°30'20.1266"N149°35'40.6857"W0.64 8.476 0.63 0.13 5715.56 58.19 18.69 19.84 54.628800.00 56.12 53.27 5994.45 5938.45 3371.75 4717.25 549616.29 6034750.77 70°30'20.6137"N149°35'38.7308"W0.39 -6.942 0.39 0.07 5798.38 59.19 18.90 20.10 54.598900.00 56.60 53.20 6049.85 5993.85 3421.58 4783.95 549682.68 6034800.99 70°30'21.1034"N149°35'36.7658"W0.48 169.561 0.48 -0.07 5881.61 60.20 19.10 20.37 54.579000.00 55.35 53.48 6105.80 6049.80 3471.07 4850.43 549748.85 6034850.88 70°30'21.5896"N149°35'34.8070"W1.27 -0.731 -1.25 0.28 5964.48 61.22 19.31 20.64 54.559100.00 56.00 53.47 6162.19 6106.19 3520.22 4916.80 549814.91 6034900.42 70°30'22.0726"N149°35'32.8517"W0.65 -7.38 0.65 -0.01 6047.05 62.23 19.52 20.91 54.539200.00 56.58 53.38 6217.69 6161.69 3569.79 4983.60 549881.41 6034950.39 70°30'22.5596"N149°35'30.8835"W0.58 -20.581 0.58 -0.09 6130.22 63.26 19.73 21.17 54.519300.00 56.87 53.25 6272.55 6216.55 3619.73 5050.64 549948.15 6035000.73 70°30'23.0504"N149°35'28.9080"W0.31 174.095 0.29 -0.13 6213.81 64.30 19.93 21.44 54.499400.00 55.83 53.38 6327.97 6271.97 3669.46 5117.40 550014.59 6035050.86 70°30'23.5390"N149°35'26.9412"W1.05 -176.914 -1.04 0.13 6297.04 65.34 20.14 21.71 54.479500.00 54.62 53.30 6385.00 6329.00 3718.51 5183.29 550080.18 6035100.30 70°30'24.0209"N149°35'24.9997"W1.21 161.097 -1.21 -0.08 6379.16 66.38 20.36 21.98 54.459600.00 54.43 53.38 6443.04 6387.04 3767.13 5248.62 550145.21 6035149.31 70°30'24.4986"N149°35'23.0748"W0.20 -77.962 -0.19 0.08 6460.59 67.41 20.58 22.25 54.449700.00 54.82 51.25 6500.93 6444.93 3816.97 5313.14 550209.42 6035199.54 70°30'24.9884"N149°35'21.1737"W1.78 -8.585 0.39 -2.13 6542.06 68.44 20.79 22.52 54.409800.00 55.53 51.12 6558.04 6502.04 3868.43 5377.10 550273.06 6035251.37 70°30'25.4940"N149°35'19.2889"W0.72 -5.89 0.71 -0.13 6624.02 69.49 21.01 22.78 54.359900.00 56.50 51.00 6613.94 6557.94 3920.54 5441.59 550337.23 6035303.87 70°30'26.0060"N149°35'17.3885"W0.98 170.462 0.97 -0.12 6706.80 70.56 21.22 23.06 54.3010000.00 53.95 51.53 6670.97 6614.97 3971.94 5505.66 550400.98 6035355.65 70°30'26.5111"N149°35'15.5006"W2.59 101.74 -2.55 0.53 6788.81 71.62 21.45 23.33 54.2610100.00 53.90 51.83 6729.85 6673.85 4022.05 5569.07 550464.08 6035406.14 70°30'27.0035"N149°35'13.6320"W0.25 130.042 -0.05 0.30 6869.54 72.67 21.68 23.62 54.2210200.00 53.63 52.23 6788.96 6732.96 4071.68 5632.65 550527.36 6035456.15 70°30'27.4910"N149°35'11.7583"W0.42 80.289 -0.27 0.40 6950.13 73.73 21.90 23.89 54.1910300.00 53.72 52.87 6848.20 6792.20 4120.67 5696.61 550591.01 6035505.52 70°30'27.9724"N 149°35'9.8735"W 0.52 36.806 0.09 0.64 7030.66 74.79 22.13 24.15 54.1610400.00 54.85 53.90 6906.57 6850.57 4169.09 5761.79 550655.88 6035554.32 70°30'28.4481"N 149°35'7.9530"W 1.41 43.865 1.13 1.03 7111.83 75.87 22.35 24.42 54.1510500.00 55.60 54.77 6963.61 6907.61 4216.98 5828.52 550722.32 6035602.61 70°30'28.9185"N 149°35'5.9865"W 1.04 109.435 0.75 0.87 7193.97 76.97 22.57 24.69 54.1510562.00 55.43 55.36 6998.71 6942.71 4246.24 5870.41 550764.03 6035632.12 70°30'29.2060"N 149°35'4.7519"W 0.83 7.726 -0.27 0.95 7245.07 77.31 23.89 24.62 54.1310582.27 59.50 56.00 7009.61 6953.61 4255.87 5884.53 550778.09 6035641.84 70°30'29.3006"N 149°35'4.3361"W 20.25 13.129 20.08 3.16 7262.15 77.3223.91 24.63 54.1310612.24 71.85 59.00 7021.94 6965.94 4270.49 5907.53 550801.00 6035656.59 70°30'29.4442"N 149°35'3.6582"W 42.20 36.747 41.21 10.01 7289.36 77.3523.9624.6654.1310640.23 80.58 65.51 7028.61 6972.61 4283.10 5931.56 550824.95 6035669.34 70°30'29.5680"N 149°35'2.9501"W 38.49 112.179 31.19 23.26 7316.25 77.39 24.01 24.73 54.1310670.38 76.04 77.57 7034.73 6978.73 4292.45 5959.50 550852.83 6035678.86 70°30'29.6597"N 149°35'2.1272"W 41.95 103.743 -15.06 40.00 7344.40 77.46 24.04 24.77 54.1510700.68 73.43 90.16 7042.74 6986.74 4295.59 5988.49 550881.80 6035682.17 70°30'29.6903"N 149°35'1.2732"W 40.99 92.016 -8.61 41.55 7369.80 77.56 24.09 24.80 54.2010710.00 73.33 94.40 7045.41 6989.41 4295.23 5997.41 550890.72 6035681.87 70°30'29.6868"N 149°35'1.0105"W 43.61 -151.997 -1.07 45.49 7376.85 78.21 23.77 24.34 53.6310730.30 70.17 92.61 7051.77 6995.77 4294.05 6016.65 550909.96 6035680.81 70°30'29.6750"N 149°35'0.4439"W 17.68 -102.38 -15.57 -8.82 7391.81 78.23 23.80 24.35 53.6410760.13 69.58 89.62 7062.03 7006.03 4293.50 6044.65 550937.96 6035680.43 70°30'29.6694"N149°34'59.6193"W9.62 -94.024 -1.98 -10.02 7414.26 78.27 23.87 24.36 53.68 Tie on to MPU L-06APB210778.00 69.45 87.44 7068.29 7012.29 4293.93 6061.38 550954.69 6035680.96 70°30'29.6735"N149°34'59.1264"W11.45 -5.398 -0.73 -12.20 7428.11 78.23 24.01 24.50 53.75 Top of WS10805.98 73.93 87.00 7077.07 7021.07 4295.22 6087.91 550981.21 6035682.41 70°30'29.6860"N149°34'58.3452"W16.08 -38.312 16.01 -1.57 7450.43 78.27 24.07 24.51 53.78 Interpolated Az10830.42 76.40 85.00 7083.33 7027.33 4296.87 6111.47 551004.76 6035684.20 70°30'29.7020"N149°34'57.6511"W12.83 -60.92 10.11 -8.18 7470.56 78.32 24.14 24.52 53.81 Interpolated Az10860.57 78.33 81.50 7089.93 7033.93 4300.33 6140.68 551033.94 6035687.84 70°30'29.7358"N149°34'56.7908"W13.01 -39.776 6.40 -11.61 7496.32 78.39 24.23 24.53 53.87 Interpolated Az10890.48 81.31 79.00 7095.21 7039.21 4305.32 6169.69 551062.92 6035693.00 70°30'29.7846"N149°34'55.9363"W12.92 -36.919 9.96 -8.36 7522.81 78.48 24.33 24.54 53.93 Interpolated Az10920.49 84.90 76.30 7098.82 7042.82 4311.69 6198.79 551091.97 6035699.55 70°30'29.8471"N149°34'55.0792"W14.93 -17.156 11.96 -9.00 7550.18 78.58 24.44 24.56 54.0110950.48 88.40 75.22 7100.57 7044.57 4319.06 6227.80 551120.94 6035707.09 70°30'29.9192"N149°34'54.2246"W12.21 -32.695 11.67 -3.60 7578.06 78.71 24.54 24.58 54.0910980.56 90.80 73.68 7100.78 7044.78 4327.12 6256.77 551149.86 6035715.33 70°30'29.9983"N149°34'53.3710"W9.48 -84.959 7.98 -5.12 7606.31 78.84 24.64 24.60 54.1811010.60 91.10 70.26 7100.28 7044.28 4336.41 6285.33 551178.36 6035724.79 70°30'30.0895"N149°34'52.5297"W11.43 -98.162 1.00 -11.38 7634.94 79.00 24.74 24.62 54.2811040.48 90.68 67.34 7099.82 7043.82 4347.22 6313.18 551206.14 6035735.76 70°30'30.1955"N149°34'51.7091"W9.87 -84.312 -1.41 -9.77 7663.88 79.17 24.83 24.64 54.3711070.58 90.95 64.62 7099.39 7043.39 4359.47 6340.67 551233.55 6035748.18 70°30'30.3157"N149°34'50.8993"W9.08 -101.257 0.90 -9.04 7693.36 79.36 24.91 24.66 54.4611100.57 90.28 61.26 7099.07 7043.07 4373.11 6367.37 551260.17 6035761.98 70°30'30.4496"N149°34'50.1125"W11.42 -36.975 -2.23 -11.20 7723.01 79.56 24.97 24.68 54.5511130.64 92.92 59.27 7098.23 7042.23 4388.01 6393.47 551286.17 6035777.04 70°30'30.5960"N149°34'49.3435"W10.99 -88.27 8.78 -6.62 7752.91 79.78 25.02 24.71 54.6311160.5393.0156.147096.687040.684403.966418.70551311.306035793.1470°30'30.7526"N149°34'48.6000"W10.46-76.5560.30-10.477782.7180.0025.0624.7454.70Page 2 of 3 11190.48 93.78 52.89 7094.91 7038.91 4421.31 6443.04 551335.53 6035810.63 70°30'30.9231"N149°34'47.8827"W11.13 -103.836 2.57 -10.85 7812.60 80.24 25.08 24.76 54.7611220.44 92.95 49.54 7093.15 7037.15 4440.04 6466.35 551358.73 6035829.50 70°30'31.1071"N149°34'47.1957"W11.50 -101.819 -2.77 -11.18 7842.46 80.48 25.09 24.80 54.8111250.69 92.09 45.46 7091.82 7035.82 4460.46 6488.63 551380.88 6035850.05 70°30'31.3077"N149°34'46.5391"W13.77 -120.117 -2.84 -13.49 7872.45 80.73 25.09 24.83 54.8411282.05 91.08 43.72 7090.95 7034.95 4482.78 6510.63 551402.75 6035872.50 70°30'31.5270"N149°34'45.8904"W6.41 -141.224 -3.22 -5.55 7903.34 80.99 25.07 24.87 54.8511310.51 89.20 42.21 7090.88 7034.88 4503.60 6530.03 551422.01 6035893.44 70°30'31.7317"N149°34'45.3186"W8.47 -128.597 -6.61 -5.31 7931.23 81.23 25.06 24.91 54.8611340.50 86.89 39.31 7091.90 7035.90 4526.30 6549.59 551441.44 6035916.26 70°30'31.9547"N149°34'44.7417"W12.36 -43.983 -7.70 -9.67 7960.35 81.49 25.04 24.95 54.8511370.54 88.86 37.41 7093.02 7037.02 4549.84 6568.22 551459.92 6035939.90 70°30'32.1860"N149°34'44.1925"W9.11 116.382 6.56 -6.32 7989.20 81.75 25.01 25.00 54.8311400.45 87.42 40.32 7093.99 7037.99 4573.11 6586.98 551478.54 6035963.29 70°30'32.4148"N149°34'43.6395"W10.85 93.012 -4.81 9.73 8018.00 82.02 25.00 25.04 54.8111430.55 87.20 44.65 7095.40 7039.40 4595.28 6607.28 551498.70 6035985.57 70°30'32.6326"N149°34'43.0409"W14.39 70.448 -0.73 14.39 8047.41 82.31 24.99 25.09 54.7911460.39 88.49 48.27 7096.52 7040.52 4615.82 6628.89 551520.19 6036006.24 70°30'32.8344"N149°34'42.4039"W12.87 71.488 4.32 12.13 8076.94 82.64 25.00 25.14 54.7911490.42 89.57 51.49 7097.03 7041.03 4635.16 6651.85 551543.02 6036025.72 70°30'33.0244"N149°34'41.7272"W11.31 59.269 3.60 10.72 8106.87 82.98 25.01 25.19 54.8011520.40 91.81 55.26 7096.67 7040.67 4653.04 6675.90 551566.97 6036043.74 70°30'33.2001"N149°34'41.0183"W14.63 94.989 7.47 12.58 8136.83 83.35 25.04 25.25 54.83 Tie on to MPU L-06APB311535.00 91.66 56.97 7096.23 7040.23 4661.18 6688.01 551579.03 6036051.95 70°30'33.2800"N149°34'40.6613"W11.75 -142.88 -1.03 11.71 8151.42 83.47 26.38 25.33 55.54 Top of Billet11560.32 88.62 54.67 7096.17 7040.17 4675.40 6708.96 551599.89 6036066.30 70°30'33.4197"N149°34'40.0440"W15.05 -99.2 -12.01 -9.08 8176.72 83.62 26.41 25.34 55.5611590.42 88.31 52.75 7096.97 7040.97 4693.21 6733.21 551624.03 6036084.25 70°30'33.5946"N149°34'39.3293"W6.46 -93.683 -1.03 -6.38 8206.81 83.82 26.43 25.34 55.5711620.20 88.10 49.44 7097.91 7041.91 4711.90 6756.37 551647.07 6036103.08 70°30'33.7782"N149°34'38.6466"W11.13 -102.54 -0.71 -11.11 8236.52 84.03 26.46 25.35 55.5811650.37 87.30 45.82 7099.12 7043.12 4732.21 6778.64 551669.21 6036123.52 70°30'33.9778"N149°34'37.9902"W12.28 -76.311 -2.65 -12.00 8266.45 84.25 26.48 25.36 55.5811680.28 88.10 42.55 7100.32 7044.32 4753.64 6799.46 551689.91 6036145.08 70°30'34.1883"N149°34'37.3762"W11.25 -63.373 2.67 -10.93 8295.86 84.48 26.49 25.37 55.5611710.30 89.39 39.98 7100.98 7044.98 4776.20 6819.26 551709.56 6036167.75 70°30'34.4100"N149°34'36.7927"W9.58 -76.277 4.30 -8.56 8325.08 84.71 26.51 25.38 55.5311740.31 90.15 36.87 7101.10 7045.10 4799.71 6837.90 551728.07 6036191.37 70°30'34.6410"N149°34'36.2428"W10.67 -76.644 2.53 -10.36 8353.93 84.95 26.52 25.40 55.4911775.45 91.07 32.99 7100.72 7044.72 4828.51 6858.02 551748.00 6036220.29 70°30'34.9241"N149°34'35.6495"W11.35 -72.274 2.62 -11.04 8387.05 85.23 26.54 25.42 55.4211800.35 92.09 29.79 7100.04 7044.04 4849.75 6870.98 551760.84 6036241.61 70°30'35.1329"N149°34'35.2671"W13.48 124.594 4.10 -12.85 8409.96 85.43 26.55 25.43 55.3611830.29 90.06 32.73 7099.47 7043.47 4875.34 6886.51 551776.21 6036267.28 70°30'35.3844"N149°34'34.8089"W11.93 140.165 -6.78 9.82 8437.48 85.68 26.57 25.45 55.2911860.32 87.21 35.11 7100.19 7044.19 4900.24 6903.26 551792.81 6036292.29 70°30'35.6292"N149°34'34.3149"W12.36 113.955 -9.49 7.93 8465.60 85.94 26.60 25.48 55.2111890.98 85.92 38.03 7102.03 7046.03 4924.82 6921.50 551810.89 6036316.97 70°30'35.8707"N149°34'33.7772"W10.40 104.909 -4.21 9.52 8494.73 86.22 26.64 25.51 55.1411920.72 84.87 42.03 7104.42 7048.42 4947.52 6940.56 551829.81 6036339.78 70°30'36.0937"N149°34'33.2152"W13.86 113.221 -3.53 13.45 8523.44 86.52 26.68 25.54 55.0711950.29 83.91 44.29 7107.31 7051.31 4968.98 6960.69 551849.81 6036361.36 70°30'36.3046"N149°34'32.6217"W8.27 78.602 -3.25 7.64 8552.30 86.82 26.72 25.57 55.0111980.27 84.75 48.40 7110.27 7054.27 4989.57 6982.27 551871.26 6036382.08 70°30'36.5069"N149°34'31.9855"W13.93 79.6 2.80 13.71 8581.83 87.15 26.76 25.60 54.9712010.26 85.46 52.22 7112.83 7056.83 5008.65 7005.26 551894.13 6036401.30 70°30'36.6943"N149°34'31.3078"W12.91 52.497 2.37 12.74 8611.63 87.50 26.80 25.64 54.9312040.27 87.45 54.81 7114.69 7058.69 5026.46 7029.33 551918.10 6036419.25 70°30'36.8692"N149°34'30.5981"W10.87 84.424 6.63 8.63 8641.57 87.86 26.83 25.67 54.9112070.33 87.82 58.55 7115.93 7059.93 5042.95 7054.43 551943.09 6036435.89 70°30'37.0312"N149°34'29.8585"W12.49 95.486 1.23 12.44 8671.58 88.24 26.86 25.71 54.9112100.63 87.57 61.18 7117.14 7061.14 5058.15 7080.61 551969.18 6036451.25 70°30'37.1805"N149°34'29.0869"W8.71 81.049 -0.83 8.68 8701.71 88.63 26.89 25.76 54.9212130.12 88.25 65.46 7118.22 7062.22 5071.38 7106.94 551995.42 6036464.63 70°30'37.3103"N149°34'28.3111"W14.69 130.421 2.31 14.51 8730.82 89.02 26.91 25.80 54.9512160.23 86.50 67.52 7119.60 7063.60 5083.38 7134.51 552022.93 6036476.80 70°30'37.4280"N149°34'27.4984"W8.97 144.357 -5.81 6.84 8760.23 89.44 26.93 25.84 55.0012190.32 83.33 69.81 7122.27 7066.27 5094.28 7162.43 552050.77 6036487.87 70°30'37.5350"N149°34'26.6760"W12.98 149.996 -10.54 7.61 8789.27 89.86 26.95 25.89 55.0612220.40 80.26 71.61 7126.56 7070.56 5104.11 7190.52 552078.80 6036497.87 70°30'37.6315"N149°34'25.8482"W11.80 -107.09 -10.21 5.98 8817.84 90.29 26.98 25.95 55.1412255.47 79.23 68.14 7132.80 7076.80 5115.98 7222.92 552111.12 6036509.94 70°30'37.7479"N149°34'24.8935"W10.17 -85.27 -2.94 -9.89 8851.10 90.80 27.02 26.01 55.2312286.37 79.55 64.47 7138.50 7082.50 5128.19 7250.72 552138.85 6036522.31 70°30'37.8677"N149°34'24.0742"W11.72 -58.254 1.04 -11.88 8880.81 91.27 27.05 26.07 55.2912315.38 81.10 61.95 7143.37 7087.37 5141.08 7276.25 552164.30 6036535.35 70°30'37.9942"N149°34'23.3220"W10.09 -111.144 5.34 -8.69 8909.07 91.72 27.09 26.12 55.3412350.34 79.70 58.22 7149.20 7093.20 5158.26 7306.12 552194.06 6036552.71 70°30'38.1629"N149°34'22.4416"W11.26 -51.679 -4.00 -10.67 8943.36 92.28 27.13 26.19 55.3712380.43 82.03 55.26 7153.98 7097.98 5174.56 7330.96 552218.80 6036569.15 70°30'38.3229"N149°34'21.7096"W12.42 -22.578 7.74 -9.84 8973.04 92.77 27.17 26.25 55.3912415.26 85.39 53.86 7157.80 7101.80 5194.63 7359.16 552246.87 6036589.39 70°30'38.5200"N149°34'20.8783"W10.44 -97.236 9.65 -4.02 9007.65 93.34 27.21 26.33 55.3912445.48 85.05 51.13 7160.32 7104.32 5212.96 7383.05 552270.65 6036607.87 70°30'38.7001"N149°34'20.1742"W9.07 -101.734 -1.13 -9.03 9037.75 93.85 27.24 26.39 55.3712475.40 84.28 47.35 7163.10 7107.10 5232.41 7405.61 552293.09 6036627.45 70°30'38.8911"N149°34'19.5090"W12.84 -102.756 -2.57 -12.63 9067.41 94.35 27.27 26.46 55.3412500.44 83.60 44.29 7165.74 7109.74 5249.76 7423.46 552310.83 6036644.90 70°30'39.0616"N149°34'18.9826"W12.45 -80.546 -2.72 -12.22 9092.03 94.77 27.30 26.52 55.3012530.46 84.09 41.38 7168.96 7112.96 5271.64 7443.75 552330.99 6036666.91 70°30'39.2766"N149°34'18.3843"W9.77 -52.379 1.63 -9.69 9121.27 95.26 27.33 26.58 55.2312560.40 86.25 38.58 7171.48 7115.48 5294.50 7462.92 552350.01 6036689.88 70°30'39.5012"N149°34'17.8191"W11.78 -75.423 7.21 -9.35 9150.16 95.74 27.36 26.66 55.1512590.49 87.30 34.57 7173.18 7117.18 5318.62 7480.81 552367.76 6036714.11 70°30'39.7383"N149°34'17.2912"W13.76 -36.595 3.49 -13.33 9178.75 96.21 27.39 26.73 55.0512622.03 90.09 32.50 7173.90 7117.90 5344.90 7498.23 552385.02 6036740.49 70°30'39.9965"N149°34'16.7774"W11.01 0 8.85 -6.56 9208.21 96.70 27.43 26.81 54.9212671.0090.0932.507173.827117.825386.207524.54552411.086036781.9470°30'40.4025"N149°34'16.0011"W0.00N/A0.000.009253.6497.4527.4926.9454.72Projection to TDPage 3 of 3 Vert Uncert 1sd[ft]0.000.00Start MDEnd MDSurvey Date[ft][ft]56.0010500.0003/19/2110500.0011440.0006/01/21MDInclinationAzimuthTVDTVDSSNorthEastGrid EastGrid NorthLatitudeLongitudeDLSToolfaceBuild RateTurn RateVert SectMajor SemiMinor SemiVert SemiMinor AzimComments[ft][°][°][ft][ft][ft][ft][US ft][US ft][°/100ft][°][°/100ft][°/100ft][ft][ft][ft][ft][°]0.00 0.00 181.10 0.00 -56.00 0.00 0.00 544919.97 6031350.91 70°29'47.4683"N149°37'57.6454"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.0056.00 0.00 181.10 56.00 0.00 0.00 0.00 544919.97 6031350.91 70°29'47.4683"N149°37'57.6454"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00100.00 0.35 181.10 100.00 44.00 -0.13 0.00 544919.97 6031350.78 70°29'47.4670"N149°37'57.6455"W0.80 -162.706 0.80 0.00 -0.08 0.13 0.08 1.32 271.10200.00 0.28 176.58 200.00 144.00 -0.68 0.01 544919.98 6031350.23 70°29'47.4616"N149°37'57.6452"W0.07 85.94 -0.07 -4.52 -0.37 0.41 0.25 1.33 89.83300.00 0.30 193.93 300.00 244.00 -1.18 -0.04 544919.93 6031349.73 70°29'47.4567"N149°37'57.6467"W0.09 -178.325 0.02 17.35 -0.68 0.67 0.43 1.36 271.74400.00 0.23 193.42 400.00 344.00 -1.63 -0.15 544919.83 6031349.28 70°29'47.4523"N149°37'57.6499"W0.07 154.392 -0.07 -0.51 -1.02 0.93 0.60 1.40 275.06500.00 0.15 209.32 500.00 444.00 -1.94 -0.26 544919.72 6031348.97 70°29'47.4492"N149°37'57.6531"W0.10 -137.834 -0.08 15.90 -1.28 1.19 0.78 1.44 278.67600.00 0.13 122.25 600.00 544.00 -2.12 -0.23 544919.75 6031348.79 70°29'47.4475"N149°37'57.6522"W0.19 -82.213 -0.02 -87.07 -1.35 1.41 0.95 1.50 95.58700.00 2.77 42.70 699.96 643.96 -0.40 1.50 544921.48 6031350.52 70°29'47.4644"N149°37'57.6011"W2.75 1.339 2.64 -79.55 1.04 1.63 1.22 1.56 102.09800.00 4.82 43.27 799.73 743.73 4.44 6.02 544925.97 6031355.38 70°29'47.5119"N149°37'57.4681"W2.05 -2.357 2.05 0.57 7.47 2.17 1.47 1.63 124.33900.00 7.38 42.45 899.16 843.16 12.24 13.24 544933.13 6031363.22 70°29'47.5886"N149°37'57.2557"W2.56 16.469 2.56 -0.82 17.78 2.57 1.65 1.71 129.531000.00 9.12 45.67 998.12 942.12 22.51 23.24 544943.07 6031373.56 70°29'47.6897"N149°37'56.9612"W1.80 8.141 1.74 3.22 31.78 2.99 1.83 1.80 132.001100.00 11.95 47.62 1096.42 1040.42 35.03 36.56 544956.32 6031386.16 70°29'47.8128"N149°37'56.5692"W2.85 4.541 2.83 1.95 49.78 3.31 2.03 1.90 134.041200.00 13.85 48.25 1193.89 1137.89 49.98 53.14 544972.80 6031401.21 70°29'47.9599"N149°37'56.0812"W1.91 10.087 1.90 0.63 71.84 3.73 2.25 2.01 135.821300.00 15.85 49.55 1290.55 1234.55 66.81 72.47 544992.02 6031418.15 70°29'48.1254"N149°37'55.5124"W2.03 6.514 2.00 1.30 97.22 4.00 2.46 2.13 136.921400.00 20.53 51.07 1385.53 1329.53 86.70 96.51 545015.95 6031438.19 70°29'48.3210"N149°37'54.8046"W4.70 58.894 4.68 1.52 128.23 4.43 2.72 2.29 138.251500.00 20.78 52.22 1479.10 1423.10 108.59 124.17 545043.47 6031460.24 70°29'48.5362"N149°37'53.9904"W0.48 -0.475 0.25 1.15 163.37 5.06 3.00 2.54 139.471600.00 21.67 52.20 1572.32 1516.32 130.77 152.78 545071.94 6031482.59 70°29'48.7544"N149°37'53.1482"W0.89 -13.085 0.89 -0.02 199.45 5.20 3.29 2.64 139.901700.00 25.33 50.22 1664.01 1608.01 155.78 183.82 545102.83 6031507.79 70°29'49.0004"N149°37'52.2345"W3.74 8.889 3.66 -1.98 239.12 5.43 3.60 2.79 320.351800.00 26.62 50.67 1753.90 1697.90 183.67 217.59 545136.43 6031535.88 70°29'49.2746"N149°37'51.2405"W1.30 3.182 1.29 0.45 282.65 5.83 3.94 3.02 320.721900.00 27.97 50.83 1842.77 1786.77 212.68 253.10 545171.76 6031565.10 70°29'49.5600"N149°37'50.1951"W1.35 -6.017 1.35 0.16 328.25 6.00 4.30 3.15 321.132000.00 30.37 50.33 1930.08 1874.08 243.64 290.75 545209.21 6031596.28 70°29'49.8644"N149°37'49.0870"W2.41 1.046 2.40 -0.50 376.70 6.20 4.68 3.31 321.592100.00 35.10 50.48 2014.17 1958.17 278.09 332.41 545250.66 6031630.98 70°29'50.2032"N149°37'47.8607"W4.73 19.576 4.73 0.15 430.43 6.53 5.11 3.58 321.972200.00 37.18 51.70 2094.93 2038.93 315.12 378.30 545296.32 6031668.28 70°29'50.5673"N149°37'46.5096"W2.20 2.799 2.08 1.22 489.11 6.97 5.58 3.97 322.192300.00 39.80 51.90 2173.19 2117.19 353.60 427.21 545344.99 6031707.05 70°29'50.9457"N149°37'45.0699"W2.62 4.17 2.62 0.20 551.10 7.18 6.08 4.18 322.822400.00 42.10 52.15 2248.72 2192.72 393.92 478.87 545396.41 6031747.68 70°29'51.3423"N149°37'43.5491"W2.31 -14.857 2.30 0.25 616.41 7.40 6.61 4.42 323.802500.00 44.90 51.10 2321.25 2265.25 436.66 532.82 545450.09 6031790.74 70°29'51.7626"N149°37'41.9610"W2.89 -8.824 2.80 -1.05 684.96 7.60 7.16 4.66 326.462600.00 47.12 50.63 2390.70 2334.70 482.07 588.62 545505.61 6031836.48 70°29'52.2091"N149°37'40.3183"W2.25 2.959 2.22 -0.47 756.51 7.83 7.72 4.93 351.052700.00 49.17 50.77 2457.42 2401.42 529.25 646.26 545562.95 6031884.00 70°29'52.6730"N149°37'38.6216"W2.05 8.665 2.05 0.14 830.57 8.37 7.97 5.16 43.792800.00 51.27 51.18 2521.40 2465.40 577.63 705.96 545622.35 6031932.74 70°29'53.1488"N149°37'36.8640"W2.12 3.267 2.10 0.41 907.02 9.01 8.14 5.40 47.562900.00 53.67 51.35 2582.31 2526.31 627.25 767.82 545683.90 6031982.72 70°29'53.6367"N149°37'35.0430"W2.40 118.796 2.40 0.17 985.95 9.67 8.30 5.65 48.803000.00 53.32 52.15 2641.80 2585.80 677.01 830.94 545746.72 6032032.86 70°29'54.1260"N149°37'33.1847"W0.73 144.952 -0.35 0.80 1066.02 10.35 8.45 5.90 49.493100.00 52.53 52.85 2702.09 2646.09 725.58 894.23 545809.71 6032081.81 70°29'54.6037"N149°37'31.3212"W0.97 108.521 -0.79 0.70 1145.58 11.04 8.58 6.07 50.013200.00 52.30 53.73 2763.08 2707.08 772.95 957.76 545872.95 6032129.56 70°29'55.0694"N149°37'29.4510"W0.73 35.182 -0.23 0.88 1224.68 11.73 8.71 6.25 50.443300.00 53.20 54.52 2823.61 2767.61 819.59 1022.26 545937.16 6032176.58 70°29'55.5281"N149°37'27.5520"W1.10 84.239 0.90 0.79 1304.19 12.43 8.85 6.44 50.843400.00 53.27 55.35 2883.46 2827.46 865.62 1087.83 546002.44 6032223.00 70°29'55.9806"N149°37'25.6216"W0.67 47.746 0.07 0.83 1384.25 13.14 8.99 6.64 51.213500.00 53.80 56.07 2942.90 2886.90 910.92 1154.27 546068.60 6032268.70 70°29'56.4261"N149°37'23.6654"W0.78 135.812 0.53 0.72 1464.66 13.86 9.13 6.83 51.583600.00 53.47 56.47 3002.19 2946.19 955.64 1221.24 546135.29 6032313.81 70°29'56.8657"N149°37'21.6937"W0.46 -84.507 -0.33 0.40 1545.18 14.58 9.27 7.03 51.923700.00 53.60 54.92 3061.63 3005.63 1000.96 1287.67 546201.44 6032359.53 70°29'57.3114"N149°37'19.7379"W1.25 112.21 0.13 -1.55 1625.59 15.30 9.42 7.23 52.173800.00 53.45 55.38 3121.07 3065.07 1046.91 1353.66 546267.14 6032405.88 70°29'57.7632"N149°37'17.7950"W0.40 17.949 -0.15 0.46 1705.96 16.03 9.56 7.43 52.343900.00 54.43 55.77 3179.94 3123.94 1092.61 1420.34 546333.54 6032451.97 70°29'58.2125"N149°37'15.8317"W1.03 -88.551 0.98 0.39 1786.78 16.77 9.71 7.65 52.524000.00 54.50 53.45 3238.06 3182.06 1139.73 1486.67 546399.58 6032499.49 70°29'58.6758"N149°37'13.8787"W1.89 -42.959 0.07 -2.32 1868.09 17.51 9.86 7.87 52.634100.00 55.28 52.57 3295.58 3239.58 1188.95 1552.01 546464.61 6032549.10 70°29'59.1597"N149°37'11.9549"W1.06 91.286 0.78 -0.88 1949.72 18.27 10.01 8.09 52.644200.00 55.27 53.20 3352.54 3296.54 1238.55 1617.55 546529.85 6032599.09 70°29'59.6473"N149°37'10.0251"W0.52 75.469 -0.01 0.63 2031.71 19.03 10.17 8.31 52.644300.00 55.45 54.03 3409.38 3353.38 1287.35 1683.79 546595.78 6032648.28 70°30'0.1272"N 149°37'8.0748"W 0.71 33.411 0.18 0.83 2113.86 19.80 10.328.5352.684400.00 56.08 54.53 3465.64 3409.64 1335.62 1750.91 546662.60 6032696.95 70°30'0.6017"N 149°37'6.0985"W 0.75 10.722 0.63 0.50 2196.45 20.58 10.478.7652.754500.00 57.28 54.80 3520.57 3464.57 1383.94 1819.07 546730.47 6032745.68 70°30'1.0768"N 149°37'4.0913"W 1.22 72.735 1.20 0.27 2279.96 21.37 10.639.0052.834590.0057.4655.483569.103513.101427.271881.27546792.396032789.3870°30'1.5027"N149°37'2.2599"W0.6771.2980.200.762355.7222.0910.779.2252.92BH Generic gyro - continuous (Standard) L-06 Gyro CT <0-10832.1> MPU L-06BH CoilTrak (2019) (Standard) MPU L-06APB1 CoilTrak <10562-11440> MPU L-06APB1Positional Uncertainty Model Log Name / CommentWellbore149°37'57.6454"W149°37'57.6454"W149°31'31.8215"WHoriz Uncert 1sd[ft]0.000.00[US ft]6031350.916031350.916027347.71Latitude70°29'47.4683"N70°29'47.4683"N70°29'7.2002"N[ft]0.00Grid East[US ft]544919.97544919.97558058.04Slot LocationFacility Reference PtField Reference PtLocal North[ft]0.0056.00 ft56.79°included50-029-22003-70Local East Grid North LongitudeSection AzimuthSurface Position UncertaintyDeclinationEllipse Confidence LimitDatabaseMilne PointNAD27 / TM Alaska SP, Zone 4 (5004), US feetTrue0.9999020.35 EastSlotRig on MPU L-06 (RT)Rig on MPU L-06 (RT)Mean Sea LevelMinimum curvature56.00 ft56.00 ftE 0.00 ftN 0.00 ftMagnetic North is 15.60 degrees East of True North2.00Std DevWA_ANC_DefnProjection SystemNorth ReferenceScaleConvergence at SlotHorizontal Reference PointVertical Reference PointMD Reference PointField Vertical ReferenceRig on MPU L-06 (RT) To Facility Vertical DatumRig on MPU L-06 (RT) To Mean Sea LevelRig on MPU L-06 (RT) to Ground Level at Slot (MPU L-06)Section Origin XSection Origin Y06/09/21 at 10:10 using WellArchitect 6.0Hilcorp Alaska, LLCNorth Slope, AlaskaActual Wellpath Geographic Report - including Position UncertaintyReport by Baker HughesOperatorAreaAPI#WellpathWellbore last revised Sidetrack fromUserCalculation methodFieldFacilitySlotWellWellboreMPU L PadMPU L-06MPU L-06APB1MPU L-06APB1MPU L-06APB106/07/2021MPU L-06_awp at 10500.00 MDUlricardPage 1 of 3 4600.00 57.48 55.55 3574.48 3518.48 1432.04 1888.22 546799.31 6032794.19 70°30'1.5496"N 149°37'2.0553"W 0.62 168.496 0.20 0.70 2364.15 22.17 10.78 9.24 52.934700.00 53.23 56.63 3631.32 3575.32 1477.94 1956.47 546867.27 6032840.50 70°30'2.0009"N 149°37'0.0457"W 4.34 158.363 -4.25 1.08 2446.39 22.96 10.97 9.52 53.054800.00 52.55 56.97 3691.65 3635.65 1521.61 2023.19 546933.73 6032884.56 70°30'2.4302"N149°36'58.0808"W0.73 102.009 -0.68 0.34 2526.14 23.73 11.21 9.90 53.174900.00 52.47 57.45 3752.51 3696.51 1564.58 2089.90 547000.17 6032927.93 70°30'2.8526"N149°36'56.1166"W0.39 105.766 -0.08 0.48 2605.48 24.50 11.39 10.13 53.315000.00 52.32 58.13 3813.54 3757.54 1606.81 2156.93 547066.93 6032970.56 70°30'3.2677"N149°36'54.1429"W0.56 135.231 -0.15 0.68 2684.69 25.27 11.56 10.36 53.475100.00 51.62 59.02 3875.14 3819.14 1647.88 2224.14 547133.89 6033012.03 70°30'3.6714"N149°36'52.1637"W0.99 -14.214 -0.70 0.89 2763.42 26.04 11.74 10.59 53.635200.00 52.72 58.67 3936.47 3880.47 1688.74 2291.73 547201.22 6033053.30 70°30'4.0731"N149°36'50.1734"W1.13 145.983 1.10 -0.35 2842.35 26.82 11.92 10.82 53.805300.00 51.70 59.55 3997.75 3941.75 1729.31 2359.54 547268.78 6033094.28 70°30'4.4719"N149°36'48.1765"W1.23 -53.137 -1.02 0.88 2921.31 27.60 12.10 11.07 53.975400.00 54.82 54.63 4057.59 4001.59 1772.88 2426.74 547335.71 6033138.25 70°30'4.9002"N149°36'46.1978"W5.03 -38.015 3.12 -4.92 3001.39 28.40 12.30 11.33 54.065500.00 55.70 53.80 4114.57 4058.57 1820.94 2493.39 547402.07 6033186.70 70°30'5.3726"N149°36'44.2348"W1.11 163.659 0.88 -0.83 3083.48 29.23 12.50 11.64 54.065600.00 54.18 54.35 4172.01 4116.01 1868.96 2559.67 547468.05 6033235.12 70°30'5.8447"N149°36'42.2828"W1.59 -4.215 -1.52 0.55 3165.24 30.05 12.68 11.89 54.065700.00 55.07 54.27 4229.91 4173.91 1916.53 2625.90 547533.98 6033283.08 70°30'6.3123"N149°36'40.3326"W0.89 32.773 0.89 -0.08 3246.70 30.88 12.87 12.15 54.065800.00 55.30 54.45 4287.00 4231.00 1964.37 2692.62 547600.40 6033331.32 70°30'6.7825"N149°36'38.3676"W0.27 128.727 0.23 0.18 3328.73 31.71 13.05 12.40 54.075900.00 54.65 55.45 4344.39 4288.39 2011.40 2759.66 547667.15 6033378.75 70°30'7.2448"N149°36'36.3934"W1.05 146.873 -0.65 1.00 3410.58 32.55 13.23 12.64 54.096000.00 53.75 56.18 4402.89 4346.89 2056.97 2826.75 547733.95 6033424.72 70°30'7.6928"N149°36'34.4175"W1.08 149.653 -0.90 0.73 3491.67 33.39 13.41 12.88 54.146100.00 52.88 56.82 4462.63 4406.63 2101.24 2893.62 547800.55 6033469.38 70°30'8.1278"N149°36'32.4482"W1.01 5.099 -0.87 0.64 3571.86 34.22 13.60 13.13 54.206200.00 53.42 56.88 4522.60 4466.60 2145.00 2960.61 547867.27 6033513.54 70°30'8.5579"N149°36'30.4751"W0.54 -12.321 0.54 0.06 3651.88 35.06 13.79 13.38 54.276300.00 54.20 56.67 4581.65 4525.65 2189.22 3028.12 547934.51 6033558.17 70°30'8.9925"N149°36'28.4868"W0.80 -11.531 0.78 -0.21 3732.59 35.90 13.98 13.62 54.336400.00 54.68 56.55 4639.80 4583.80 2233.99 3096.05 548002.15 6033603.34 70°30'9.4326"N149°36'26.4863"W0.49 5.577 0.48 -0.12 3813.94 36.76 14.17 13.87 54.396500.00 55.10 56.60 4697.32 4641.32 2279.05 3164.32 548070.15 6033648.81 70°30'9.8754"N149°36'24.4755"W0.42 -34.423 0.42 0.05 3895.74 37.63 14.36 14.12 54.446600.00 55.28 56.45 4754.40 4698.40 2324.34 3232.81 548138.35 6033694.51 70°30'10.3205"N149°36'22.4584"W0.22 -14.781 0.18 -0.15 3977.84 38.50 14.54 14.37 54.496700.00 55.75 56.30 4811.02 4755.02 2369.98 3301.44 548206.70 6033740.56 70°30'10.7691"N149°36'20.4370"W0.49 -117.525 0.47 -0.15 4060.27 39.38 14.73 14.62 54.546800.00 55.60 55.95 4867.41 4811.41 2416.01 3370.01 548274.98 6033787.00 70°30'11.2215"N149°36'18.4174"W0.33 -174.333 -0.15 -0.35 4142.85 40.27 14.92 14.87 54.576900.00 54.13 55.77 4924.96 4868.96 2461.91 3437.69 548342.38 6033833.30 70°30'11.6726"N149°36'16.4239"W1.48 -12.262 -1.47 -0.18 4224.62 41.16 15.11 15.13 54.607000.00 54.58 55.65 4983.24 4927.24 2507.69 3504.83 548409.24 6033879.48 70°30'12.1225"N149°36'14.4463"W0.46 -1.594 0.45 -0.12 4305.86 42.05 15.31 15.39 54.637100.00 55.17 55.63 5040.77 4984.77 2553.85 3572.35 548476.47 6033926.04 70°30'12.5762"N149°36'12.4576"W0.59 -8.62 0.59 -0.02 4387.64 42.94 15.50 15.64 54.657200.00 55.77 55.52 5097.46 5041.46 2600.42 3640.31 548544.13 6033973.02 70°30'13.0339"N149°36'10.4560"W0.61 -4.754 0.60 -0.11 4470.00 43.85 15.70 15.90 54.677299.00 56.27 55.47 5152.79 5096.79 2646.93 3707.96 548611.50 6034019.93 70°30'13.4910"N 149°36'8.4633"W 0.51 0 0.51 -0.05 4552.07 44.76 15.89 16.16 54.697300.00 56.28 55.47 5153.34 5097.34 2647.40 3708.64 548612.18 6034020.41 70°30'13.4956"N 149°36'8.4432"W 1.00 -171.588 1.00 0.00 4552.91 44.77 15.89 16.16 54.697400.00 54.68 55.18 5210.01 5154.01 2694.27 3776.40 548679.65 6034067.68 70°30'13.9562"N 149°36'6.4473"W 1.62 -6.814 -1.60 -0.29 4635.27 45.69 16.09 16.42 54.707500.00 55.23 55.10 5267.43 5211.43 2741.07 3843.58 548746.53 6034114.88 70°30'14.4161"N 149°36'4.4685"W 0.55 1.482 0.55 -0.08 4717.10 46.61 16.29 16.69 54.717600.00 55.87 55.12 5324.00 5268.00 2788.23 3911.22 548813.88 6034162.45 70°30'14.8796"N 149°36'2.4761"W 0.64 -8.281 0.64 0.02 4799.53 47.54 16.49 16.94 54.727700.00 56.27 55.05 5379.82 5323.82 2835.72 3979.26 548881.62 6034210.34 70°30'15.3463"N 149°36'0.4719"W 0.40 -23.961 0.40 -0.07 4882.47 48.48 16.68 17.20 54.737800.00 56.42 54.97 5435.24 5379.24 2883.46 4047.45 548949.52 6034258.48 70°30'15.8154"N149°35'58.4631"W0.16 -24.196 0.15 -0.08 4965.66 49.43 16.88 17.46 54.737900.00 56.55 54.90 5490.45 5434.45 2931.35 4115.69 549017.46 6034306.79 70°30'16.2861"N149°35'56.4529"W0.14 -173.977 0.13 -0.07 5048.99 50.39 17.07 17.72 54.748000.00 56.00 54.83 5545.97 5489.97 2979.22 4183.71 549085.18 6034355.06 70°30'16.7565"N149°35'54.4492"W0.55 -19.639 -0.55 -0.07 5132.12 51.35 17.27 17.98 54.748100.00 56.35 54.68 5601.64 5545.64 3027.16 4251.55 549152.73 6034403.40 70°30'17.2276"N149°35'52.4506"W0.37 -22.062 0.35 -0.15 5215.14 52.31 17.47 18.25 54.748200.00 56.68 54.52 5656.81 5600.81 3075.47 4319.54 549220.42 6034452.12 70°30'17.7023"N149°35'50.4478"W0.36 -122.642 0.33 -0.16 5298.48 53.28 17.67 18.51 54.748300.00 56.10 53.42 5712.17 5656.17 3124.46 4386.89 549287.46 6034501.51 70°30'18.1837"N149°35'48.4637"W1.08 -35.13 -0.58 -1.10 5381.66 54.26 17.87 18.77 54.728400.00 56.42 53.15 5767.71 5711.71 3174.17 4453.55 549353.81 6034551.62 70°30'18.6722"N149°35'46.4999"W0.39 180 0.32 -0.27 5464.66 55.24 18.07 19.04 54.708500.00 54.77 53.15 5824.21 5768.21 3223.65 4519.57 549419.53 6034601.49 70°30'19.1584"N149°35'44.5549"W1.65 -11.246 -1.65 0.00 5547.00 56.22 18.27 19.30 54.678600.00 55.10 53.07 5881.66 5825.66 3272.78 4585.03 549484.69 6034651.01 70°30'19.6412"N149°35'42.6263"W0.34 9.679 0.33 -0.08 5628.68 57.20 18.48 19.57 54.648700.00 55.73 53.20 5938.42 5882.42 3322.17 4650.90 549550.25 6034700.80 70°30'20.1266"N149°35'40.6857"W0.64 8.476 0.63 0.13 5710.84 58.19 18.69 19.84 54.628800.00 56.12 53.27 5994.45 5938.45 3371.75 4717.25 549616.29 6034750.77 70°30'20.6137"N149°35'38.7308"W0.39 -6.942 0.39 0.07 5793.51 59.19 18.90 20.10 54.598900.00 56.60 53.20 6049.85 5993.85 3421.58 4783.95 549682.68 6034800.99 70°30'21.1034"N149°35'36.7658"W0.48 169.561 0.48 -0.07 5876.60 60.20 19.10 20.37 54.579000.00 55.35 53.48 6105.80 6049.80 3471.07 4850.43 549748.85 6034850.88 70°30'21.5896"N149°35'34.8070"W1.27 -0.731 -1.25 0.28 5959.33 61.22 19.31 20.64 54.559100.00 56.00 53.47 6162.19 6106.19 3520.22 4916.80 549814.91 6034900.42 70°30'22.0726"N149°35'32.8517"W0.65 -7.38 0.65 -0.01 6041.78 62.23 19.52 20.91 54.539200.00 56.58 53.38 6217.69 6161.69 3569.79 4983.60 549881.41 6034950.39 70°30'22.5596"N149°35'30.8835"W0.58 -20.581 0.58 -0.09 6124.82 63.26 19.73 21.17 54.519300.00 56.87 53.25 6272.55 6216.55 3619.73 5050.64 549948.15 6035000.73 70°30'23.0504"N149°35'28.9080"W0.31 174.095 0.29 -0.13 6208.27 64.30 19.93 21.44 54.499400.00 55.83 53.38 6327.97 6271.97 3669.46 5117.40 550014.59 6035050.86 70°30'23.5390"N149°35'26.9412"W1.05 -176.914 -1.04 0.13 6291.36 65.34 20.14 21.71 54.479500.00 54.62 53.30 6385.00 6329.00 3718.51 5183.29 550080.18 6035100.30 70°30'24.0209"N149°35'24.9997"W1.21 161.097 -1.21 -0.08 6373.35 66.38 20.36 21.98 54.459600.00 54.43 53.38 6443.04 6387.04 3767.13 5248.62 550145.21 6035149.31 70°30'24.4986"N149°35'23.0748"W0.20 -77.962 -0.19 0.08 6454.64 67.41 20.58 22.25 54.449700.00 54.82 51.25 6500.93 6444.93 3816.97 5313.14 550209.42 6035199.54 70°30'24.9884"N149°35'21.1737"W1.78 -8.585 0.39 -2.13 6535.92 68.44 20.79 22.52 54.409800.00 55.53 51.12 6558.04 6502.04 3868.43 5377.10 550273.06 6035251.37 70°30'25.4940"N149°35'19.2889"W0.72 -5.89 0.71 -0.13 6617.62 69.49 21.01 22.78 54.359900.00 56.50 51.00 6613.94 6557.94 3920.54 5441.59 550337.23 6035303.87 70°30'26.0060"N149°35'17.3885"W0.98 170.462 0.97 -0.12 6700.12 70.56 21.22 23.06 54.3010000.00 53.95 51.53 6670.97 6614.97 3971.94 5505.66 550400.98 6035355.65 70°30'26.5111"N149°35'15.5006"W2.59 101.74 -2.55 0.53 6781.87 71.62 21.45 23.33 54.2610100.00 53.90 51.83 6729.85 6673.85 4022.05 5569.07 550464.08 6035406.14 70°30'27.0035"N149°35'13.6320"W0.25 130.042 -0.05 0.30 6862.37 72.67 21.68 23.62 54.2210200.00 53.63 52.23 6788.96 6732.96 4071.68 5632.65 550527.36 6035456.15 70°30'27.4910"N149°35'11.7583"W0.42 80.289 -0.27 0.40 6942.75 73.73 21.90 23.89 54.1910300.00 53.72 52.87 6848.20 6792.20 4120.67 5696.61 550591.01 6035505.52 70°30'27.9724"N 149°35'9.8735"W 0.52 36.806 0.09 0.64 7023.10 74.79 22.13 24.15 54.1610400.00 54.85 53.90 6906.57 6850.57 4169.09 5761.79 550655.88 6035554.32 70°30'28.4481"N 149°35'7.9530"W 1.41 43.865 1.13 1.03 7104.15 75.87 22.35 24.42 54.1510500.00 55.60 54.77 6963.61 6907.61 4216.98 5828.52 550722.32 6035602.61 70°30'28.9185"N 149°35'5.9865"W 1.04 109.435 0.75 0.87 7186.21 76.97 22.57 24.69 54.15 Tie On Point to MPU L-0610562.00 55.43 55.36 6998.71 6942.71 4246.24 5870.41 550764.03 6035632.12 70°30'29.2060"N 149°35'4.7519"W 0.83 7.726 -0.27 0.95 7237.29 77.31 23.89 24.62 54.13 Top of WS10582.27 59.50 56.00 7009.61 6953.61 4255.87 5884.53 550778.09 6035641.84 70°30'29.3006"N 149°35'4.3361"W 20.25 13.129 20.08 3.16 7254.37 77.3223.91 24.63 54.13 Int Az10612.24 71.85 59.00 7021.94 6965.94 4270.49 5907.53 550801.00 6035656.59 70°30'29.4442"N 149°35'3.6582"W 42.20 36.747 41.21 10.01 7281.62 77.35 23.96 24.66 54.13 Int Az10640.23 80.58 65.51 7028.61 6972.61 4283.10 5931.56 550824.95 6035669.34 70°30'29.5680"N 149°35'2.9501"W 38.49 112.179 31.19 23.26 7308.64 77.39 24.01 24.73 54.1310670.38 76.04 77.57 7034.73 6978.73 4292.45 5959.50 550852.83 6035678.86 70°30'29.6597"N 149°35'2.1272"W 41.95 103.743 -15.06 40.00 7337.13 77.46 24.04 24.77 54.1510700.68 73.43 90.16 7042.74 6986.74 4295.59 5988.49 550881.80 6035682.17 70°30'29.6903"N 149°35'1.2732"W 40.99 92.069 -8.61 41.55 7363.11 77.56 24.09 24.80 54.2010730.40 73.40 103.67 7051.26 6995.26 4292.17 6016.69 550910.02 6035678.92 70°30'29.6565"N 149°35'0.4428"W 43.56 92.824 -0.10 45.46 7384.83 77.65 24.19 24.82 54.2810760.45 73.20 117.09 7059.93 7003.93 4282.17 6043.60 550936.98 6035669.09 70°30'29.5580"N149°34'59.6505"W42.77 99.44 -0.67 44.66 7401.87 77.73 24.36 24.84 54.3910790.39 71.61 129.65 7069.02 7013.02 4266.52 6067.39 550960.86 6035653.59 70°30'29.4039"N149°34'58.9503"W40.33 91.267 -5.31 41.95 7413.20 77.78 24.59 24.86 54.5010820.32 71.77 142.45 7078.45 7022.45 4246.11 6087.06 550980.65 6035633.30 70°30'29.2030"N149°34'58.3715"W40.60 98.935 0.53 42.77 7418.48 77.80 24.87 24.89 54.6010850.43 70.29 155.51 7088.28 7032.28 4221.78 6101.70 550995.44 6035609.07 70°30'28.9636"N149°34'57.9407"W41.30 100.099 -4.92 43.37 7417.41 77.79 25.19 24.91 234.6610880.33 68.57 169.00 7098.83 7042.83 4195.21 6110.23 551004.13 6035582.54 70°30'28.7022"N149°34'57.6903"W42.62 72.955 -5.75 45.12 7409.98 77.77 25.49 24.95 234.6910910.27 72.43 180.83 7108.85 7052.85 4167.16 6112.69 551006.76 6035554.51 70°30'28.4263"N149°34'57.6185"W39.40 71.097 12.89 39.51 7396.68 77.75 25.75 24.98 234.6710940.69 76.90 193.15 7116.92 7060.92 4138.11 6109.09 551003.34 6035525.45 70°30'28.1407"N149°34'57.7251"W41.71 73.901 14.69 40.50 7377.77 77.74 25.95 25.01 234.6310971.05 80.01 203.42 7123.01 7067.01 4109.92 6099.76 550994.18 6035497.20 70°30'27.8635"N149°34'58.0006"W34.68 82.952 10.24 33.83 7354.52 77.75 26.09 25.05 234.5711000.70 81.10 211.56 7127.89 7071.89 4084.00 6086.27 550980.84 6035471.20 70°30'27.6087"N149°34'58.3985"W27.33 74.13 3.68 27.45 7329.03 77.77 26.17 25.09 234.5111030.68 82.30 215.74 7132.22 7076.22 4059.31 6069.83 550964.56 6035446.42 70°30'27.3660"N149°34'58.8832"W14.37 62.424 4.00 13.94 7301.76 77.81 26.20 25.12 234.4511060.41 84.10 219.18 7135.74 7079.74 4035.88 6051.88 550946.75 6035422.89 70°30'27.1358"N149°34'59.4125"W12.99 63.013 6.05 11.57 7273.91 77.86 26.23 25.16 234.3911090.29 86.13 223.15 7138.28 7082.28 4013.48 6032.29 550927.30 6035400.36 70°30'26.9156"N149°34'59.9900"W14.88 49.446 6.79 13.29 7245.24 77.92 26.23 25.19 234.3411119.46 88.10 225.45 7139.75 7083.75 3992.63 6011.94 550907.08 6035379.40 70°30'26.7107"N 149°35'0.5897"W 10.37 33.969 6.75 7.88 7216.80 78.0026.24 25.23 234.2911150.22 91.07 227.45 7139.97 7083.97 3971.44 5989.65 550884.92 6035358.07 70°30'26.5025"N 149°35'1.2466"W 11.64 100.156 9.66 6.50 7186.55 78.09 26.23 25.28 234.2411180.23 90.49 230.68 7139.57 7083.57 3951.78 5966.99 550862.38 6035338.28 70°30'26.3093"N 149°35'1.9146"W 10.93 71.874 -1.93 10.76 7156.82 78.20 26.22 25.33 234.2011210.86 91.50 233.77 7139.03 7083.03 3933.03 5942.78 550838.29 6035319.38 70°30'26.1250"N 149°35'2.6279"W 10.61 -75.467 3.30 10.09 7126.30 78.33 26.20 25.37 234.1611240.46 91.87 232.34 7138.16 7082.16 3915.24 5919.14 550814.75 6035301.46 70°30'25.9503"N 149°35'3.3247"W 4.99 -82.549 1.25 -4.83 7096.77 78.48 26.18 25.42 234.1311270.07 92.24 229.49 7137.10 7081.10 3896.59 5896.17 550791.90 6035282.67 70°30'25.7671"N 149°35'4.0015"W 9.70 -94.726 1.25 -9.63 7067.34 78.63 26.16 25.46 234.0911300.3091.99226.507135.997079.993876.375873.73550769.586035262.3270°30'25.5684"N149°35'4.6630"W9.9253.91-0.83-9.897037.4978.7926.1625.51234.04Page 2 of 3 11330.56 93.19 228.15 7134.62 7078.62 3855.89 5851.50 550747.48 6035241.70 70°30'25.3671"N 149°35'5.3179"W 6.74 85.991 3.97 5.45 7007.67 78.97 26.15 25.57 233.9911360.58 93.38 230.92 7132.90 7076.90 3836.44 5828.70 550724.80 6035222.11 70°30'25.1760"N 149°35'5.9898"W 9.23 86.626 0.63 9.23 6977.95 79.16 26.14 25.62 233.9411390.11 93.59 234.61 7131.10 7075.10 3818.60 5805.24 550701.45 6035204.14 70°30'25.0008"N 149°35'6.6812"W 12.49 0 0.71 12.50 6948.55 79.37 26.12 25.68 233.9011440.0093.59234.617127.987071.983789.775764.65550661.046035175.0670°30'24.7175"N149°35'7.8773"W0.00N/A0.000.006898.7979.7626.0825.77233.85Projected to TDPage 3 of 3 Vert Uncert 1sd[ft]0.000.00Start MDEnd MDSurvey Date[ft][ft]56.0010500.0003/19/2110500.0010700.6806/01/2110700.6811886.0006/07/21MDInclinationAzimuthTVDTVDSSNorthEastGrid EastGrid NorthLatitudeLongitudeDLSToolfaceBuild RateTurn RateVert SectMajor SemiMinor SemiVert SemiMinor AzimComments[ft][°][°][ft][ft][ft][ft][US ft][US ft][°/100ft][°][°/100ft][°/100ft][ft][ft][ft][ft][°]0.00 0.00 181.10 0.00 -56.00 0.00 0.00 544919.97 6031350.91 70°29'47.4683"N149°37'57.6454"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.0056.00 0.00 181.10 56.00 0.00 0.00 0.00 544919.97 6031350.91 70°29'47.4683"N149°37'57.6454"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00100.00 0.35 181.10 100.00 44.00 -0.13 0.00 544919.97 6031350.78 70°29'47.4670"N149°37'57.6455"W0.80 -162.706 0.80 0.00 -0.08 0.13 0.08 1.32 271.10200.00 0.28 176.58 200.00 144.00 -0.68 0.01 544919.98 6031350.23 70°29'47.4616"N149°37'57.6452"W0.07 85.94 -0.07 -4.52 -0.39 0.41 0.25 1.33 89.83300.00 0.30 193.93 300.00 244.00 -1.18 -0.04 544919.93 6031349.73 70°29'47.4567"N149°37'57.6467"W0.09 -178.325 0.02 17.35 -0.72 0.67 0.43 1.36 271.74400.00 0.23 193.42 400.00 344.00 -1.63 -0.15 544919.83 6031349.28 70°29'47.4523"N149°37'57.6499"W0.07 154.392 -0.07 -0.51 -1.07 0.93 0.60 1.40 275.06500.00 0.15 209.32 500.00 444.00 -1.94 -0.26 544919.72 6031348.97 70°29'47.4492"N149°37'57.6531"W0.10 -137.834 -0.08 15.90 -1.34 1.19 0.78 1.44 278.67600.00 0.13 122.25 600.00 544.00 -2.12 -0.23 544919.75 6031348.79 70°29'47.4475"N149°37'57.6522"W0.19 -82.213 -0.02 -87.07 -1.42 1.41 0.95 1.50 95.58700.00 2.77 42.70 699.96 643.96 -0.40 1.50 544921.48 6031350.52 70°29'47.4644"N149°37'57.6011"W2.75 1.339 2.64 -79.55 0.99 1.63 1.22 1.56 102.09800.00 4.82 43.27 799.73 743.73 4.44 6.02 544925.97 6031355.38 70°29'47.5119"N149°37'57.4681"W2.05 -2.357 2.05 0.57 7.48 2.17 1.47 1.63 124.33900.00 7.38 42.45 899.16 843.16 12.24 13.24 544933.13 6031363.22 70°29'47.5886"N149°37'57.2557"W2.56 16.469 2.56 -0.82 17.89 2.57 1.65 1.71 129.531000.00 9.12 45.67 998.12 942.12 22.51 23.24 544943.07 6031373.56 70°29'47.6897"N149°37'56.9612"W1.80 8.141 1.74 3.22 32.00 2.99 1.83 1.80 132.001100.00 11.95 47.62 1096.42 1040.42 35.03 36.56 544956.32 6031386.16 70°29'47.8128"N149°37'56.5692"W2.85 4.541 2.83 1.95 50.12 3.31 2.03 1.90 134.041200.00 13.85 48.25 1193.89 1137.89 49.98 53.14 544972.80 6031401.21 70°29'47.9599"N149°37'56.0812"W1.91 10.087 1.90 0.63 72.30 3.73 2.25 2.01 135.821300.00 15.85 49.55 1290.55 1234.55 66.81 72.47 544992.02 6031418.15 70°29'48.1254"N149°37'55.5124"W2.03 6.514 2.00 1.30 97.81 4.00 2.46 2.13 136.921400.00 20.53 51.07 1385.53 1329.53 86.70 96.51 545015.95 6031438.19 70°29'48.3210"N149°37'54.8046"W4.70 58.894 4.68 1.52 128.94 4.43 2.72 2.29 138.251500.00 20.78 52.22 1479.10 1423.10 108.59 124.17 545043.47 6031460.24 70°29'48.5362"N149°37'53.9904"W0.48 -0.475 0.25 1.15 164.17 5.06 3.00 2.54 139.471600.00 21.67 52.20 1572.32 1516.32 130.77 152.78 545071.94 6031482.59 70°29'48.7544"N149°37'53.1482"W0.89 -13.085 0.89 -0.02 200.34 5.20 3.29 2.64 139.901700.00 25.33 50.22 1664.01 1608.01 155.78 183.82 545102.83 6031507.79 70°29'49.0004"N149°37'52.2345"W3.74 8.889 3.66 -1.98 240.14 5.43 3.60 2.79 320.351800.00 26.62 50.67 1753.90 1697.90 183.67 217.59 545136.43 6031535.88 70°29'49.2746"N149°37'51.2405"W1.30 3.182 1.29 0.45 283.83 5.83 3.94 3.02 320.721900.00 27.97 50.83 1842.77 1786.77 212.68 253.10 545171.76 6031565.10 70°29'49.5600"N149°37'50.1951"W1.35 -6.017 1.35 0.16 329.60 6.00 4.30 3.15 321.132000.00 30.37 50.33 1930.08 1874.08 243.64 290.75 545209.21 6031596.28 70°29'49.8644"N149°37'49.0870"W2.41 1.046 2.40 -0.50 378.22 6.20 4.68 3.31 321.592100.00 35.10 50.48 2014.17 1958.17 278.09 332.41 545250.66 6031630.98 70°29'50.2032"N149°37'47.8607"W4.73 19.576 4.73 0.15 432.15 6.53 5.11 3.58 321.972200.00 37.18 51.70 2094.93 2038.93 315.12 378.30 545296.32 6031668.28 70°29'50.5673"N149°37'46.5096"W2.20 2.799 2.08 1.22 491.02 6.97 5.58 3.97 322.192300.00 39.80 51.90 2173.19 2117.19 353.60 427.21 545344.99 6031707.05 70°29'50.9457"N149°37'45.0699"W2.62 4.17 2.62 0.20 553.19 7.18 6.08 4.18 322.822400.00 42.10 52.15 2248.72 2192.72 393.92 478.87 545396.41 6031747.68 70°29'51.3423"N149°37'43.5491"W2.31 -14.857 2.30 0.25 618.67 7.40 6.61 4.42 323.802500.00 44.90 51.10 2321.25 2265.25 436.66 532.82 545450.09 6031790.74 70°29'51.7626"N149°37'41.9610"W2.89 -8.824 2.80 -1.05 687.41 7.60 7.16 4.66 326.462600.00 47.12 50.63 2390.70 2334.70 482.07 588.62 545505.61 6031836.48 70°29'52.2091"N149°37'40.3183"W2.25 2.959 2.22 -0.47 759.21 7.83 7.72 4.93 351.052700.00 49.17 50.77 2457.42 2401.42 529.25 646.26 545562.95 6031884.00 70°29'52.6730"N149°37'38.6216"W2.05 8.665 2.05 0.14 833.53 8.37 7.97 5.16 43.792800.00 51.27 51.18 2521.40 2465.40 577.63 705.96 545622.35 6031932.74 70°29'53.1488"N149°37'36.8640"W2.12 3.267 2.10 0.41 910.24 9.01 8.14 5.40 47.562900.00 53.67 51.35 2582.31 2526.31 627.25 767.82 545683.90 6031982.72 70°29'53.6367"N149°37'35.0430"W2.40 118.796 2.40 0.17 989.42 9.67 8.30 5.65 48.803000.00 53.32 52.15 2641.80 2585.80 677.01 830.94 545746.72 6032032.86 70°29'54.1260"N149°37'33.1847"W0.73 144.952 -0.35 0.80 1069.71 10.35 8.45 5.90 49.493100.00 52.53 52.85 2702.09 2646.09 725.58 894.23 545809.71 6032081.81 70°29'54.6037"N149°37'31.3212"W0.97 108.521 -0.79 0.70 1149.45 11.04 8.58 6.07 50.013200.00 52.30 53.73 2763.08 2707.08 772.95 957.76 545872.95 6032129.56 70°29'55.0694"N149°37'29.4510"W0.73 35.182 -0.23 0.88 1228.67 11.73 8.71 6.25 50.443300.00 53.20 54.52 2823.61 2767.61 819.59 1022.26 545937.16 6032176.58 70°29'55.5281"N149°37'27.5520"W1.10 84.239 0.90 0.79 1308.27 12.43 8.85 6.44 50.843400.00 53.27 55.35 2883.46 2827.46 865.62 1087.83 546002.44 6032223.00 70°29'55.9806"N149°37'25.6216"W0.67 47.746 0.07 0.83 1388.38 13.14 8.99 6.64 51.213500.00 53.80 56.07 2942.90 2886.90 910.92 1154.27 546068.60 6032268.70 70°29'56.4261"N149°37'23.6654"W0.78 135.812 0.53 0.72 1468.78 13.86 9.13 6.83 51.583600.00 53.47 56.47 3002.19 2946.19 955.64 1221.24 546135.29 6032313.81 70°29'56.8657"N149°37'21.6937"W0.46 -84.507 -0.33 0.40 1549.26 14.58 9.27 7.03 51.923700.00 53.60 54.92 3061.63 3005.63 1000.96 1287.67 546201.44 6032359.53 70°29'57.3114"N149°37'19.7379"W1.25 112.21 0.13 -1.55 1629.66 15.30 9.42 7.23 52.173800.00 53.45 55.38 3121.07 3065.07 1046.91 1353.66 546267.14 6032405.88 70°29'57.7632"N149°37'17.7950"W0.40 17.949 -0.15 0.46 1710.06 16.03 9.56 7.43 52.343900.00 54.43 55.77 3179.94 3123.94 1092.61 1420.34 546333.54 6032451.97 70°29'58.2125"N149°37'15.8317"W1.03 -88.551 0.98 0.39 1790.89 16.77 9.71 7.65 52.524000.00 54.50 53.45 3238.06 3182.06 1139.73 1486.67 546399.58 6032499.49 70°29'58.6758"N149°37'13.8787"W1.89 -42.959 0.07 -2.32 1872.25 17.51 9.86 7.87 52.634100.00 55.28 52.57 3295.58 3239.58 1188.95 1552.01 546464.61 6032549.10 70°29'59.1597"N149°37'11.9549"W1.06 91.286 0.78 -0.88 1954.03 18.27 10.01 8.09 52.644200.00 55.27 53.20 3352.54 3296.54 1238.55 1617.55 546529.85 6032599.09 70°29'59.6473"N149°37'10.0251"W0.52 75.469 -0.01 0.63 2036.19 19.03 10.17 8.31 52.644300.00 55.45 54.03 3409.38 3353.38 1287.35 1683.79 546595.78 6032648.28 70°30'0.1272"N 149°37'8.0748"W 0.71 33.411 0.18 0.83 2118.45 19.80 10.328.5352.684400.00 56.08 54.53 3465.64 3409.64 1335.62 1750.91 546662.60 6032696.95 70°30'0.6017"N 149°37'6.0985"W 0.75 10.722 0.63 0.50 2201.13 20.58 10.478.7652.754500.0057.2854.803520.573464.571383.941819.07546730.476032745.6870°30'1.0768"N149°37'4.0913"W1.2272.7351.200.272284.6921.3710.639.0052.83BH CoilTrak (2019) (Standard) MPU L-06APB2 CoilTrak <10710-11886> MPU L-06APB2BH Generic gyro - continuous (Standard) L-06 Gyro CT <0-10832.1> MPU L-06BH CoilTrak (2019) (Standard) MPU L-06APB1 CoilTrak <10562-11440> MPU L-06APB1Positional Uncertainty Model Log Name / CommentWellbore149°37'57.6454"W149°37'57.6454"W149°31'31.8215"WHoriz Uncert 1sd[ft]0.000.00[US ft]6031350.916031350.916027347.71Latitude70°29'47.4683"N70°29'47.4683"N70°29'7.2002"N[ft]0.00Grid East[US ft]544919.97544919.97558058.04Slot LocationFacility Reference PtField Reference PtLocal North[ft]0.0054.43°not included50-029-22003-71Local East Grid North LongitudeSection AzimuthSurface Position UncertaintyAPI#NAD27 / TM Alaska SP, Zone 4 (5004), US feetTrue0.9999020.35 EastSlotRig on MPU L-06 (RT)Rig on MPU L-06 (RT)Mean Sea Level56.00 ft56.00 ft56.00 ftE 0.00 ftN 0.00 ftMagnetic North is 15.36 degrees East of True North2.00Std DevWA_ANC_DefnProjection SystemNorth ReferenceScaleConvergence at SlotHorizontal Reference PointVertical Reference PointMD Reference PointField Vertical ReferenceRig on MPU L-06 (RT) To Facility Vertical DatumRig on MPU L-06 (RT) To Mean Sea LevelRig on MPU L-06 (RT) to Ground Level at Slot (MPU L-06)Section Origin XSection Origin YDeclinationEllipse Confidence LimitDatabase01/19/22 at 16:02 using WellArchitect 6.0Hilcorp Alaska, LLCNorth Slope, AlaskaMilne PointMPU L PadMPU L-06MPU L-06APB2MPU L-06APB2MPU L-06APB201/06/2022MPU L-06APB1 at 10700.68 MDUlricardMinimum curvatureWellpathWellbore last revised Sidetrack fromUserCalculation methodFieldFacilitySlotWellWellboreActual Wellpath Geographic Report - including Position UncertaintyReport by Baker HughesOperatorAreaPage 1 of 3 4590.00 57.46 55.48 3569.10 3513.10 1427.27 1881.27 546792.39 6032789.38 70°30'1.5027"N 149°37'2.2599"W 0.67 71.298 0.20 0.76 2360.48 22.09 10.779.2252.924600.00 57.48 55.55 3574.48 3518.48 1432.04 1888.22 546799.31 6032794.19 70°30'1.5496"N 149°37'2.0553"W 0.62 168.496 0.20 0.70 2368.90 22.17 10.78 9.24 52.934700.00 53.23 56.63 3631.32 3575.32 1477.94 1956.47 546867.27 6032840.50 70°30'2.0009"N 149°37'0.0457"W 4.34 158.363 -4.25 1.08 2451.12 22.96 10.97 9.52 53.054800.00 52.55 56.97 3691.65 3635.65 1521.61 2023.19 546933.73 6032884.56 70°30'2.4302"N149°36'58.0808"W0.73 102.009 -0.68 0.34 2530.80 23.73 11.21 9.90 53.174900.00 52.47 57.45 3752.51 3696.51 1564.58 2089.90 547000.17 6032927.93 70°30'2.8526"N149°36'56.1166"W0.39 105.766 -0.08 0.48 2610.05 24.50 11.39 10.13 53.315000.00 52.32 58.13 3813.54 3757.54 1606.81 2156.93 547066.93 6032970.56 70°30'3.2677"N149°36'54.1429"W0.56 135.231 -0.15 0.68 2689.14 25.27 11.56 10.36 53.475100.00 51.62 59.02 3875.14 3819.14 1647.88 2224.14 547133.89 6033012.03 70°30'3.6714"N149°36'52.1637"W0.99 -14.214 -0.70 0.89 2767.70 26.04 11.74 10.59 53.635200.00 52.72 58.67 3936.47 3880.47 1688.74 2291.73 547201.22 6033053.30 70°30'4.0731"N149°36'50.1734"W1.13 145.983 1.10 -0.35 2846.44 26.82 11.92 10.82 53.805300.00 51.70 59.55 3997.75 3941.75 1729.31 2359.54 547268.78 6033094.28 70°30'4.4719"N149°36'48.1765"W1.23 -53.137 -1.02 0.88 2925.20 27.60 12.10 11.07 53.975400.00 54.82 54.63 4057.59 4001.59 1772.88 2426.74 547335.71 6033138.25 70°30'4.9002"N149°36'46.1978"W5.03 -38.015 3.12 -4.92 3005.20 28.40 12.30 11.33 54.065500.00 55.70 53.80 4114.57 4058.57 1820.94 2493.39 547402.07 6033186.70 70°30'5.3726"N149°36'44.2348"W1.11 163.659 0.88 -0.83 3087.38 29.23 12.50 11.64 54.065600.00 54.18 54.35 4172.01 4116.01 1868.96 2559.67 547468.05 6033235.12 70°30'5.8447"N149°36'42.2828"W1.59 -4.215 -1.52 0.55 3169.23 30.05 12.68 11.89 54.065700.00 55.07 54.27 4229.91 4173.91 1916.53 2625.90 547533.98 6033283.08 70°30'6.3123"N149°36'40.3326"W0.89 32.773 0.89 -0.08 3250.76 30.88 12.87 12.15 54.065800.00 55.30 54.45 4287.00 4231.00 1964.37 2692.62 547600.40 6033331.32 70°30'6.7825"N149°36'38.3676"W0.27 128.727 0.23 0.18 3332.86 31.71 13.05 12.40 54.075900.00 54.65 55.45 4344.39 4288.39 2011.40 2759.66 547667.15 6033378.75 70°30'7.2448"N149°36'36.3934"W1.05 146.873 -0.65 1.00 3414.75 32.55 13.23 12.64 54.096000.00 53.75 56.18 4402.89 4346.89 2056.97 2826.75 547733.95 6033424.72 70°30'7.6928"N149°36'34.4175"W1.08 149.653 -0.90 0.73 3495.83 33.39 13.41 12.88 54.146100.00 52.88 56.82 4462.63 4406.63 2101.24 2893.62 547800.55 6033469.38 70°30'8.1278"N149°36'32.4482"W1.01 5.099 -0.87 0.64 3575.97 34.22 13.60 13.13 54.206200.00 53.42 56.88 4522.60 4466.60 2145.00 2960.61 547867.27 6033513.54 70°30'8.5579"N149°36'30.4751"W0.54 -12.321 0.54 0.06 3655.92 35.06 13.79 13.38 54.276300.00 54.20 56.67 4581.65 4525.65 2189.22 3028.12 547934.51 6033558.17 70°30'8.9925"N149°36'28.4868"W0.80 -11.531 0.78 -0.21 3736.56 35.90 13.98 13.62 54.336400.00 54.68 56.55 4639.80 4583.80 2233.99 3096.05 548002.15 6033603.34 70°30'9.4326"N149°36'26.4863"W0.49 5.577 0.48 -0.12 3817.85 36.76 14.17 13.87 54.396500.00 55.10 56.60 4697.32 4641.32 2279.05 3164.32 548070.15 6033648.81 70°30'9.8754"N149°36'24.4755"W0.42 -34.423 0.42 0.05 3899.59 37.63 14.36 14.12 54.446600.00 55.28 56.45 4754.40 4698.40 2324.34 3232.81 548138.35 6033694.51 70°30'10.3205"N149°36'22.4584"W0.22 -14.781 0.18 -0.15 3981.64 38.50 14.54 14.37 54.496700.00 55.75 56.30 4811.02 4755.02 2369.98 3301.44 548206.70 6033740.56 70°30'10.7691"N149°36'20.4370"W0.49 -117.525 0.47 -0.15 4064.02 39.38 14.73 14.62 54.546800.00 55.60 55.95 4867.41 4811.41 2416.01 3370.01 548274.98 6033787.00 70°30'11.2215"N149°36'18.4174"W0.33 -174.333 -0.15 -0.35 4146.57 40.27 14.92 14.87 54.576900.00 54.13 55.77 4924.96 4868.96 2461.91 3437.69 548342.38 6033833.30 70°30'11.6726"N149°36'16.4239"W1.48 -12.262 -1.47 -0.18 4228.32 41.16 15.11 15.13 54.607000.00 54.58 55.65 4983.24 4927.24 2507.69 3504.83 548409.24 6033879.48 70°30'12.1225"N149°36'14.4463"W0.46 -1.594 0.45 -0.12 4309.57 42.05 15.31 15.39 54.637100.00 55.17 55.63 5040.77 4984.77 2553.85 3572.35 548476.47 6033926.04 70°30'12.5762"N149°36'12.4576"W0.59 -8.62 0.59 -0.02 4391.34 42.94 15.50 15.64 54.657200.00 55.77 55.52 5097.46 5041.46 2600.42 3640.31 548544.13 6033973.02 70°30'13.0339"N149°36'10.4560"W0.61 -4.754 0.60 -0.11 4473.70 43.85 15.70 15.90 54.677299.00 56.27 55.47 5152.79 5096.79 2646.93 3707.96 548611.50 6034019.93 70°30'13.4910"N 149°36'8.4633"W 0.51 0 0.51 -0.05 4555.78 44.76 15.89 16.16 54.697300.00 56.28 55.47 5153.34 5097.34 2647.40 3708.64 548612.18 6034020.41 70°30'13.4956"N 149°36'8.4432"W 1.00 -171.588 1.00 0.00 4556.62 44.77 15.89 16.16 54.697400.00 54.68 55.18 5210.01 5154.01 2694.27 3776.40 548679.65 6034067.68 70°30'13.9562"N 149°36'6.4473"W 1.62 -6.814 -1.60 -0.29 4639.00 45.69 16.09 16.42 54.707500.00 55.23 55.10 5267.43 5211.43 2741.07 3843.58 548746.53 6034114.88 70°30'14.4161"N 149°36'4.4685"W 0.55 1.482 0.55 -0.08 4720.86 46.61 16.29 16.69 54.717600.00 55.87 55.12 5324.00 5268.00 2788.23 3911.22 548813.88 6034162.45 70°30'14.8796"N 149°36'2.4761"W 0.64 -8.281 0.64 0.02 4803.31 47.54 16.49 16.94 54.727700.00 56.27 55.05 5379.82 5323.82 2835.72 3979.26 548881.62 6034210.34 70°30'15.3463"N 149°36'0.4719"W 0.40 -23.961 0.40 -0.07 4886.28 48.48 16.68 17.20 54.737800.00 56.42 54.97 5435.24 5379.24 2883.46 4047.45 548949.52 6034258.48 70°30'15.8154"N149°35'58.4631"W0.16 -24.196 0.15 -0.08 4969.52 49.43 16.88 17.46 54.737900.00 56.55 54.90 5490.45 5434.45 2931.35 4115.69 549017.46 6034306.79 70°30'16.2861"N149°35'56.4529"W0.14 -173.977 0.13 -0.07 5052.89 50.39 17.07 17.72 54.748000.00 56.00 54.83 5545.97 5489.97 2979.22 4183.71 549085.18 6034355.06 70°30'16.7565"N149°35'54.4492"W0.55 -19.639 -0.55 -0.07 5136.05 51.35 17.27 17.98 54.748100.00 56.35 54.68 5601.64 5545.64 3027.16 4251.55 549152.73 6034403.40 70°30'17.2276"N149°35'52.4506"W0.37 -22.062 0.35 -0.15 5219.13 52.31 17.47 18.25 54.748200.00 56.68 54.52 5656.81 5600.81 3075.47 4319.54 549220.42 6034452.12 70°30'17.7023"N149°35'50.4478"W0.36 -122.642 0.33 -0.16 5302.53 53.28 17.67 18.51 54.748300.00 56.10 53.42 5712.17 5656.17 3124.46 4386.89 549287.46 6034501.51 70°30'18.1837"N149°35'48.4637"W1.08 -35.13 -0.58 -1.10 5385.81 54.26 17.87 18.77 54.728400.00 56.42 53.15 5767.71 5711.71 3174.17 4453.55 549353.81 6034551.62 70°30'18.6722"N149°35'46.4999"W0.39 180 0.32 -0.27 5468.95 55.24 18.07 19.04 54.708500.00 54.77 53.15 5824.21 5768.21 3223.65 4519.57 549419.53 6034601.49 70°30'19.1584"N149°35'44.5549"W1.65 -11.246 -1.65 0.00 5551.43 56.22 18.27 19.30 54.678600.00 55.10 53.07 5881.66 5825.66 3272.78 4585.03 549484.69 6034651.01 70°30'19.6412"N149°35'42.6263"W0.34 9.679 0.33 -0.08 5633.26 57.20 18.48 19.57 54.648700.00 55.73 53.20 5938.42 5882.42 3322.17 4650.90 549550.25 6034700.80 70°30'20.1266"N149°35'40.6857"W0.64 8.476 0.63 0.13 5715.57 58.19 18.69 19.84 54.628800.00 56.12 53.27 5994.45 5938.45 3371.75 4717.25 549616.29 6034750.77 70°30'20.6137"N149°35'38.7308"W0.39 -6.942 0.39 0.07 5798.38 59.19 18.90 20.10 54.598900.00 56.60 53.20 6049.85 5993.85 3421.58 4783.95 549682.68 6034800.99 70°30'21.1034"N149°35'36.7658"W0.48 169.561 0.48 -0.07 5881.61 60.20 19.10 20.37 54.579000.00 55.35 53.48 6105.80 6049.80 3471.07 4850.43 549748.85 6034850.88 70°30'21.5896"N149°35'34.8070"W1.27 -0.731 -1.25 0.28 5964.48 61.22 19.31 20.64 54.559100.00 56.00 53.47 6162.19 6106.19 3520.22 4916.80 549814.91 6034900.42 70°30'22.0726"N149°35'32.8517"W0.65 -7.38 0.65 -0.01 6047.05 62.23 19.52 20.91 54.539200.00 56.58 53.38 6217.69 6161.69 3569.79 4983.60 549881.41 6034950.39 70°30'22.5596"N149°35'30.8835"W0.58 -20.581 0.58 -0.09 6130.22 63.26 19.73 21.17 54.519300.00 56.87 53.25 6272.55 6216.55 3619.73 5050.64 549948.15 6035000.73 70°30'23.0504"N149°35'28.9080"W0.31 174.095 0.29 -0.13 6213.81 64.30 19.93 21.44 54.499400.00 55.83 53.38 6327.97 6271.97 3669.46 5117.40 550014.59 6035050.86 70°30'23.5390"N149°35'26.9412"W1.05 -176.914 -1.04 0.13 6297.04 65.34 20.14 21.71 54.479500.00 54.62 53.30 6385.00 6329.00 3718.51 5183.29 550080.18 6035100.30 70°30'24.0209"N149°35'24.9997"W1.21 161.097 -1.21 -0.08 6379.16 66.38 20.36 21.98 54.459600.00 54.43 53.38 6443.04 6387.04 3767.13 5248.62 550145.21 6035149.31 70°30'24.4986"N149°35'23.0748"W0.20 -77.962 -0.19 0.08 6460.58 67.41 20.58 22.25 54.449700.00 54.82 51.25 6500.93 6444.93 3816.97 5313.14 550209.42 6035199.54 70°30'24.9884"N149°35'21.1737"W1.78 -8.585 0.39 -2.13 6542.06 68.44 20.79 22.52 54.409800.00 55.53 51.12 6558.04 6502.04 3868.43 5377.10 550273.06 6035251.37 70°30'25.4940"N149°35'19.2889"W0.72 -5.89 0.71 -0.13 6624.02 69.49 21.01 22.78 54.359900.00 56.50 51.00 6613.94 6557.94 3920.54 5441.59 550337.23 6035303.87 70°30'26.0060"N149°35'17.3885"W0.98 170.462 0.97 -0.12 6706.79 70.56 21.22 23.06 54.3010000.00 53.95 51.53 6670.97 6614.97 3971.94 5505.66 550400.98 6035355.65 70°30'26.5111"N149°35'15.5006"W2.59 101.74 -2.55 0.53 6788.80 71.62 21.45 23.33 54.2610100.00 53.90 51.83 6729.85 6673.85 4022.05 5569.07 550464.08 6035406.14 70°30'27.0035"N149°35'13.6320"W0.25 130.042 -0.05 0.30 6869.53 72.67 21.68 23.62 54.2210200.00 53.63 52.23 6788.96 6732.96 4071.68 5632.65 550527.36 6035456.15 70°30'27.4910"N149°35'11.7583"W0.42 80.289 -0.27 0.40 6950.12 73.73 21.90 23.89 54.1910300.00 53.72 52.87 6848.20 6792.20 4120.67 5696.61 550591.01 6035505.52 70°30'27.9724"N 149°35'9.8735"W 0.52 36.806 0.09 0.64 7030.64 74.79 22.13 24.15 54.1610400.00 54.85 53.90 6906.57 6850.57 4169.09 5761.79 550655.88 6035554.32 70°30'28.4481"N 149°35'7.9530"W 1.41 43.865 1.13 1.03 7111.82 75.87 22.35 24.42 54.1510500.00 55.60 54.77 6963.61 6907.61 4216.98 5828.52 550722.32 6035602.61 70°30'28.9185"N 149°35'5.9865"W 1.04 109.435 0.75 0.87 7193.96 76.97 22.57 24.69 54.1510562.00 55.43 55.36 6998.71 6942.71 4246.24 5870.41 550764.03 6035632.12 70°30'29.2060"N 149°35'4.7519"W 0.83 7.726 -0.27 0.95 7245.06 77.31 23.89 24.62 54.1310582.27 59.50 56.00 7009.61 6953.61 4255.87 5884.53 550778.09 6035641.84 70°30'29.3006"N 149°35'4.3361"W 20.25 13.129 20.08 3.16 7262.14 77.3223.91 24.63 54.1310612.24 71.85 59.00 7021.94 6965.94 4270.49 5907.53 550801.00 6035656.59 70°30'29.4442"N 149°35'3.6582"W 42.20 36.747 41.21 10.01 7289.35 77.3523.9624.6654.1310640.23 80.58 65.51 7028.61 6972.61 4283.10 5931.56 550824.95 6035669.34 70°30'29.5680"N 149°35'2.9501"W 38.49 112.179 31.19 23.26 7316.23 77.39 24.01 24.73 54.1310670.38 76.04 77.57 7034.73 6978.73 4292.45 5959.50 550852.83 6035678.86 70°30'29.6597"N 149°35'2.1272"W 41.95 103.743 -15.06 40.00 7344.40 77.46 24.04 24.77 54.1510700.68 73.43 90.16 7042.74 6986.74 4295.59 5988.49 550881.80 6035682.17 70°30'29.6903"N 149°35'1.2732"W 40.99 92.016 -8.61 41.55 7369.80 77.56 24.09 24.80 54.2010710.00 73.33 94.40 7045.41 6989.41 4295.23 5997.41 550890.72 6035681.87 70°30'29.6868"N 149°35'1.0105"W 43.61 -151.997 -1.07 45.49 7376.85 78.21 23.77 24.34 53.6310730.30 70.17 92.61 7051.77 6995.77 4294.05 6016.65 550909.96 6035680.81 70°30'29.6750"N 149°35'0.4439"W 17.68 -102.38 -15.57 -8.82 7391.81 78.23 23.80 24.35 53.6410760.13 69.58 89.62 7062.03 7006.03 4293.50 6044.65 550937.96 6035680.43 70°30'29.6694"N149°34'59.6193"W9.62 -93.965 -1.98 -10.02 7414.27 78.27 23.87 24.36 53.6810790.26 69.38 85.94 7072.60 7016.60 4294.60 6072.84 550966.15 6035681.69 70°30'29.6799"N149°34'58.7890"W11.46 -85 -0.66 -12.21 7437.83 78.33 23.96 24.38 53.7210820.32 69.75 81.98 7083.09 7027.09 4297.56 6100.85 550994.13 6035684.83 70°30'29.7089"N149°34'57.9641"W12.41 -50.002 1.23 -13.17 7462.34 78.39 24.06 24.39 53.7810850.42 72.18 78.97 7092.91 7036.91 4302.27 6128.90 551022.15 6035689.71 70°30'29.7550"N149°34'57.1377"W12.43 -87.112 8.07 -10.00 7487.90 78.47 24.16 24.40 53.8410880.33 72.44 74.58 7102.01 7046.01 4308.79 6156.63 551049.84 6035696.39 70°30'29.8189"N149°34'56.3208"W14.01 -90.51 0.87 -14.68 7514.24 78.57 24.27 24.42 53.9110910.16 72.44 71.20 7111.01 7055.01 4317.16 6183.81 551076.96 6035704.92 70°30'29.9009"N149°34'55.5202"W10.80 -98.725 0.00 -11.33 7541.22 78.69 24.37 24.43 53.9910940.21 71.95 67.62 7120.20 7064.20 4327.21 6210.59 551103.68 6035715.14 70°30'29.9996"N149°34'54.7313"W11.46 -90.602 -1.63 -11.91 7568.85 78.82 24.45 24.45 54.0610970.03 71.99 61.28 7129.44 7073.44 4339.44 6236.15 551129.17 6035727.52 70°30'30.1196"N149°34'53.9780"W20.22 -29.523 0.13 -21.26 7596.75 78.96 24.53 24.48 54.1411000.47 74.29 59.93 7138.27 7082.27 4353.74 6261.53 551154.46 6035741.97 70°30'30.2600"N149°34'53.2302"W8.67 14.169 7.56 -4.43 7625.71 79.12 24.58 24.50 54.2011030.28 77.15 60.67 7145.62 7089.62 4368.05 6286.62 551179.46 6035756.43 70°30'30.4006"N149°34'52.4908"W9.89 2.171 9.59 2.48 7654.45 79.29 24.64 24.52 54.2711060.41 81.59 60.84 7151.17 7095.17 4382.51 6312.46 551205.20 6035771.05 70°30'30.5426"N149°34'51.7297"W14.75 1.22 14.74 0.56 7683.87 79.48 24.70 24.55 54.3411090.45 86.28 60.94 7154.35 7098.35 4397.04 6338.55 551231.20 6035785.73 70°30'30.6852"N149°34'50.9608"W15.62 16.611 15.61 0.33 7713.55 79.69 24.76 24.59 54.4111120.35 90.34 62.15 7155.23 7099.23 4411.28 6364.82 551257.38 6035800.12 70°30'30.8250"N149°34'50.1868"W14.17 -28.891 13.58 4.05 7743.20 79.91 24.81 24.63 54.4811150.19 93.38 60.47 7154.26 7098.26 4425.59 6390.98 551283.45 6035814.60 70°30'30.9656"N149°34'49.4160"W11.64 -85.318 10.19 -5.63 7772.80 80.14 24.86 24.67 54.5611180.39 93.60 57.73 7152.42 7096.42 4441.07 6416.84 551309.22 6035830.23 70°30'31.1176"N149°34'48.6538"W9.09 -32.845 0.73 -9.07 7802.84 80.39 24.91 24.71 54.6311210.27 96.92 55.57 7149.68 7093.68 4457.42 6441.69 551333.97 6035846.73 70°30'31.2782"N149°34'47.9215"W13.24 -106.843 11.11 -7.23 7832.57 80.65 24.94 24.74 54.6911240.3595.6051.257146.407090.404475.246465.69551357.866035864.6970°30'31.4533"N149°34'47.2142"W14.93-92.81-4.39-14.367862.4580.9124.9624.7854.75Page 2 of 3 11270.41 95.38 47.05 7143.52 7087.52 4494.81 6488.32 551380.36 6035884.39 70°30'31.6455"N149°34'46.5472"W13.93 -71.692 -0.73 -13.97 7892.24 81.18 24.96 24.82 54.7811300.36 96.52 43.55 7140.42 7084.42 4515.76 6509.49 551401.41 6035905.47 70°30'31.8514"N149°34'45.9231"W12.23 -40.24 3.81 -11.69 7921.65 81.44 24.95 24.86 54.7911330.31 99.44 41.04 7136.26 7080.26 4537.69 6529.45 551421.23 6035927.52 70°30'32.0669"N149°34'45.3348"W12.80 -81.204 9.75 -8.38 7950.64 81.71 24.93 24.90 54.7911360.44 99.97 37.44 7131.18 7075.18 4560.69 6548.23 551439.87 6035950.63 70°30'32.2929"N149°34'44.7809"W11.91 -81.755 1.76 -11.95 7979.30 81.97 24.90 24.95 54.7711390.38 100.40 34.32 7125.88 7069.88 4584.56 6565.50 551456.99 6035974.60 70°30'32.5275"N149°34'44.2717"W10.36 -93.851 1.44 -10.42 8007.23 82.22 24.87 24.99 54.7411420.44 100.16 30.96 7120.52 7064.52 4609.46 6581.45 551472.79 6035999.60 70°30'32.7723"N149°34'43.8013"W11.03 90.894 -0.80 -11.18 8034.69 82.48 24.84 25.04 54.6911450.31 100.09 34.37 7115.27 7059.27 4634.21 6597.32 551488.51 6036024.44 70°30'33.0156"N149°34'43.3332"W11.24 90.282 -0.23 11.42 8062.00 82.73 24.82 25.09 54.6311480.38 100.03 39.28 7110.01 7054.01 4657.91 6615.06 551506.10 6036048.24 70°30'33.2484"N149°34'42.8101"W16.08 96.569 -0.20 16.33 8090.21 83.02 24.81 25.14 54.5811510.49 99.47 43.93 7104.91 7048.91 4680.09 6634.76 551525.67 6036070.54 70°30'33.4664"N149°34'42.2293"W15.33 106.115 -1.86 15.44 8119.14 83.34 24.81 25.19 54.5511540.23 97.84 49.48 7100.43 7044.43 4700.24 6656.15 551546.93 6036090.81 70°30'33.6644"N149°34'41.5987"W19.25 129.128 -5.48 18.66 8148.26 83.69 24.82 25.24 54.5311570.27 94.43 53.66 7097.22 7041.22 4718.79 6679.54 551570.21 6036109.51 70°30'33.8467"N149°34'40.9093"W17.89 -128.322 -11.35 13.91 8178.08 84.07 24.84 25.30 54.5411600.12 92.92 51.75 7095.31 7039.31 4736.84 6703.24 551593.79 6036127.70 70°30'34.0240"N149°34'40.2109"W8.15 -107.287 -5.06 -6.40 8207.85 84.46 24.87 25.37 54.5511630.25 91.93 48.58 7094.03 7038.03 4756.12 6726.35 551616.79 6036147.12 70°30'34.2134"N149°34'39.5296"W11.01 -91.47 -3.29 -10.52 8237.87 84.86 24.88 25.43 54.5611660.24 91.84 45.20 7093.04 7037.04 4776.61 6748.23 551638.54 6036167.73 70°30'34.4146"N149°34'38.8847"W11.27 -144.943 -0.30 -11.27 8267.58 85.26 24.89 25.49 54.5411690.34 88.96 43.18 7092.83 7036.83 4798.18 6769.21 551659.38 6036189.43 70°30'34.6266"N149°34'38.2662"W11.69 -80.893 -9.57 -6.71 8297.20 85.66 24.90 25.56 54.5111720.25 89.85 37.65 7093.14 7037.14 4820.95 6788.59 551678.63 6036212.31 70°30'34.8503"N149°34'37.6947"W18.73 133.872 2.98 -18.49 8326.20 86.05 24.90 25.64 54.4611750.39 88.86 38.68 7093.48 7037.48 4844.64 6807.21 551697.10 6036236.11 70°30'35.0832"N149°34'37.1456"W4.74 146.061 -3.28 3.42 8355.13 86.43 24.91 25.71 54.3911780.44 87.02 39.92 7094.56 7038.56 4867.88 6826.23 551715.98 6036259.46 70°30'35.3116"N149°34'36.5848"W7.38 100.269 -6.12 4.13 8384.12 86.83 24.92 25.78 54.3311810.35 86.22 44.40 7096.33 7040.33 4890.01 6846.27 551735.88 6036281.71 70°30'35.5290"N149°34'35.9940"W15.19 93.961 -2.67 14.98 8413.29 87.25 24.94 25.86 54.2711840.26 85.85 50.03 7098.40 7042.40 4910.27 6868.15 551757.64 6036302.10 70°30'35.7280"N149°34'35.3488"W18.82 94.32 -1.24 18.82 8442.88 87.71 24.96 25.94 54.2411850.72 85.67 52.47 7099.17 7043.17 4916.79 6876.29 551765.74 6036308.67 70°30'35.7922"N149°34'35.1090"W23.33 0 -1.72 23.33 8453.30 87.88 24.97 25.97 54.2311886.0085.6752.477101.837045.834938.236904.19551793.506036330.2770°30'36.0027"N149°34'34.2867"W0.00N/A0.000.008488.4688.4625.0026.0654.23Projection to TDPage 3 of 3 Vert Uncert 1sd[ft]0.000.00Start MDEnd MDSurvey Date[ft][ft]56.0010500.0003/19/2110500.0010700.6806/01/2110700.6810760.1306/07/2110760.1312133.0001/13/22MDInclinationAzimuthTVDTVDSSNorthEastGrid EastGrid NorthLatitudeLongitudeDLSToolfaceBuild RateTurn RateVert SectMajor SemiMinor SemiVert SemiMinor AzimComments[ft][°][°][ft][ft][ft][ft][US ft][US ft][°/100ft][°][°/100ft][°/100ft][ft][ft][ft][ft][°]0.00 0.00 181.10 0.00 -56.00 0.00 0.00 544919.97 6031350.91 70°29'47.4683"N149°37'57.6454"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.0056.00 0.00 181.10 56.00 0.00 0.00 0.00 544919.97 6031350.91 70°29'47.4683"N149°37'57.6454"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00100.00 0.35 181.10 100.00 44.00 -0.13 0.00 544919.97 6031350.78 70°29'47.4670"N149°37'57.6455"W0.80 -162.706 0.80 0.00 -0.08 0.13 0.08 1.32 271.10200.00 0.28 176.58 200.00 144.00 -0.68 0.01 544919.98 6031350.23 70°29'47.4616"N149°37'57.6452"W0.07 85.94 -0.07 -4.52 -0.39 0.41 0.25 1.33 89.83300.00 0.30 193.93 300.00 244.00 -1.18 -0.04 544919.93 6031349.73 70°29'47.4567"N149°37'57.6467"W0.09 -178.325 0.02 17.35 -0.72 0.67 0.43 1.36 271.74400.00 0.23 193.42 400.00 344.00 -1.63 -0.15 544919.83 6031349.28 70°29'47.4523"N149°37'57.6499"W0.07 154.392 -0.07 -0.51 -1.08 0.93 0.60 1.40 275.06500.00 0.15 209.32 500.00 444.00 -1.94 -0.26 544919.72 6031348.97 70°29'47.4492"N149°37'57.6531"W0.10 -137.834 -0.08 15.90 -1.35 1.19 0.78 1.44 278.67600.00 0.13 122.25 600.00 544.00 -2.12 -0.23 544919.75 6031348.79 70°29'47.4475"N149°37'57.6522"W0.19 -82.213 -0.02 -87.07 -1.42 1.41 0.95 1.50 95.58700.00 2.77 42.70 699.96 643.96 -0.40 1.50 544921.48 6031350.52 70°29'47.4644"N149°37'57.6011"W2.75 1.339 2.64 -79.55 0.99 1.63 1.22 1.56 102.09800.00 4.82 43.27 799.73 743.73 4.44 6.02 544925.97 6031355.38 70°29'47.5119"N149°37'57.4681"W2.05 -2.357 2.05 0.57 7.48 2.17 1.47 1.63 124.33900.00 7.38 42.45 899.16 843.16 12.24 13.24 544933.13 6031363.22 70°29'47.5886"N149°37'57.2557"W2.56 16.469 2.56 -0.82 17.89 2.57 1.65 1.71 129.531000.00 9.12 45.67 998.12 942.12 22.51 23.24 544943.07 6031373.56 70°29'47.6897"N149°37'56.9612"W1.80 8.141 1.74 3.22 32.01 2.99 1.83 1.80 132.001100.00 11.95 47.62 1096.42 1040.42 35.03 36.56 544956.32 6031386.16 70°29'47.8128"N149°37'56.5692"W2.85 4.541 2.83 1.95 50.13 3.31 2.03 1.90 134.041200.00 13.85 48.25 1193.89 1137.89 49.98 53.14 544972.80 6031401.21 70°29'47.9599"N149°37'56.0812"W1.91 10.087 1.90 0.63 72.32 3.73 2.25 2.01 135.821300.00 15.85 49.55 1290.55 1234.55 66.81 72.47 544992.02 6031418.15 70°29'48.1254"N149°37'55.5124"W2.03 6.514 2.00 1.30 97.84 4.00 2.46 2.13 136.921400.00 20.53 51.07 1385.53 1329.53 86.70 96.51 545015.95 6031438.19 70°29'48.3210"N149°37'54.8046"W4.70 58.894 4.68 1.52 128.97 4.43 2.72 2.29 138.251500.00 20.78 52.22 1479.10 1423.10 108.59 124.17 545043.47 6031460.24 70°29'48.5362"N149°37'53.9904"W0.48 -0.475 0.25 1.15 164.20 5.06 3.00 2.54 139.471600.00 21.67 52.20 1572.32 1516.32 130.77 152.78 545071.94 6031482.59 70°29'48.7544"N149°37'53.1482"W0.89 -13.085 0.89 -0.02 200.38 5.20 3.29 2.64 139.901700.00 25.33 50.22 1664.01 1608.01 155.78 183.82 545102.83 6031507.79 70°29'49.0004"N149°37'52.2345"W3.74 8.889 3.66 -1.98 240.18 5.43 3.60 2.79 320.351800.00 26.62 50.67 1753.90 1697.90 183.67 217.59 545136.43 6031535.88 70°29'49.2746"N149°37'51.2405"W1.30 3.182 1.29 0.45 283.88 5.83 3.94 3.02 320.721900.00 27.97 50.83 1842.77 1786.77 212.68 253.10 545171.76 6031565.10 70°29'49.5600"N149°37'50.1951"W1.35 -6.017 1.35 0.16 329.65 6.00 4.30 3.15 321.132000.00 30.37 50.33 1930.08 1874.08 243.64 290.75 545209.21 6031596.28 70°29'49.8644"N149°37'49.0870"W2.41 1.046 2.40 -0.50 378.28 6.20 4.68 3.31 321.592100.00 35.10 50.48 2014.17 1958.17 278.09 332.41 545250.66 6031630.98 70°29'50.2032"N149°37'47.8607"W4.73 19.576 4.73 0.15 432.22 6.53 5.11 3.58 321.972200.00 37.18 51.70 2094.93 2038.93 315.12 378.30 545296.32 6031668.28 70°29'50.5673"N149°37'46.5096"W2.20 2.799 2.08 1.22 491.10 6.97 5.58 3.97 322.192300.00 39.80 51.90 2173.19 2117.19 353.60 427.21 545344.99 6031707.05 70°29'50.9457"N149°37'45.0699"W2.62 4.17 2.62 0.20 553.27 7.18 6.08 4.18 322.822400.00 42.10 52.15 2248.72 2192.72 393.92 478.87 545396.41 6031747.68 70°29'51.3423"N149°37'43.5491"W2.31 -14.857 2.30 0.25 618.76 7.40 6.61 4.42 323.802500.00 44.90 51.10 2321.25 2265.25 436.66 532.82 545450.09 6031790.74 70°29'51.7626"N149°37'41.9610"W2.89 -8.824 2.80 -1.05 687.51 7.60 7.16 4.66 326.462600.00 47.12 50.63 2390.70 2334.70 482.07 588.62 545505.61 6031836.48 70°29'52.2091"N149°37'40.3183"W2.25 2.959 2.22 -0.47 759.32 7.83 7.72 4.93 351.052700.00 49.17 50.77 2457.42 2401.42 529.25 646.26 545562.95 6031884.00 70°29'52.6730"N149°37'38.6216"W2.05 8.665 2.05 0.14 833.65 8.37 7.97 5.16 43.792800.00 51.27 51.18 2521.40 2465.40 577.63 705.96 545622.35 6031932.74 70°29'53.1488"N149°37'36.8640"W2.12 3.267 2.10 0.41 910.37 9.01 8.14 5.40 47.562900.00 53.67 51.35 2582.31 2526.31 627.25 767.82 545683.90 6031982.72 70°29'53.6367"N149°37'35.0430"W2.40 118.796 2.40 0.17 989.55 9.67 8.30 5.65 48.803000.00 53.32 52.15 2641.80 2585.80 677.01 830.94 545746.72 6032032.86 70°29'54.1260"N149°37'33.1847"W0.73 144.952 -0.35 0.80 1069.85 10.35 8.45 5.90 49.493100.00 52.53 52.85 2702.09 2646.09 725.58 894.23 545809.71 6032081.81 70°29'54.6037"N149°37'31.3212"W0.97 108.521 -0.79 0.70 1149.60 11.04 8.58 6.07 50.013200.00 52.30 53.73 2763.08 2707.08 772.95 957.76 545872.95 6032129.56 70°29'55.0694"N149°37'29.4510"W0.73 35.182 -0.23 0.88 1228.83 11.73 8.71 6.25 50.443300.00 53.20 54.52 2823.61 2767.61 819.59 1022.26 545937.16 6032176.58 70°29'55.5281"N149°37'27.5520"W1.10 84.239 0.90 0.79 1308.43 12.43 8.85 6.44 50.843400.00 53.27 55.35 2883.46 2827.46 865.62 1087.83 546002.44 6032223.00 70°29'55.9806"N149°37'25.6216"W0.67 47.746 0.07 0.83 1388.53 13.14 8.99 6.64 51.213500.00 53.80 56.07 2942.90 2886.90 910.92 1154.27 546068.60 6032268.70 70°29'56.4261"N149°37'23.6654"W0.78 135.812 0.53 0.72 1468.93 13.86 9.13 6.83 51.583600.00 53.47 56.47 3002.19 2946.19 955.64 1221.24 546135.29 6032313.81 70°29'56.8657"N149°37'21.6937"W0.46 -84.507 -0.33 0.40 1549.40 14.58 9.27 7.03 51.923700.00 53.60 54.92 3061.63 3005.63 1000.96 1287.67 546201.44 6032359.53 70°29'57.3114"N149°37'19.7379"W1.25 112.21 0.13 -1.55 1629.80 15.30 9.42 7.23 52.173800.00 53.45 55.38 3121.07 3065.07 1046.91 1353.66 546267.14 6032405.88 70°29'57.7632"N149°37'17.7950"W0.40 17.949 -0.15 0.46 1710.20 16.03 9.56 7.43 52.343900.00 54.43 55.77 3179.94 3123.94 1092.61 1420.34 546333.54 6032451.97 70°29'58.2125"N149°37'15.8317"W1.03 -88.551 0.98 0.39 1791.02 16.77 9.71 7.65 52.524000.00 54.50 53.45 3238.06 3182.06 1139.73 1486.67 546399.58 6032499.49 70°29'58.6758"N149°37'13.8787"W1.89 -42.959 0.07 -2.32 1872.38 17.51 9.86 7.87 52.634100.00 55.28 52.57 3295.58 3239.58 1188.95 1552.01 546464.61 6032549.10 70°29'59.1597"N149°37'11.9549"W1.06 91.286 0.78 -0.88 1954.17 18.27 10.01 8.09 52.644200.00 55.27 53.20 3352.54 3296.54 1238.55 1617.55 546529.85 6032599.09 70°29'59.6473"N149°37'10.0251"W0.52 75.469 -0.01 0.63 2036.33 19.03 10.17 8.31 52.644300.00 55.45 54.03 3409.38 3353.38 1287.35 1683.79 546595.78 6032648.28 70°30'0.1272"N 149°37'8.0748"W 0.71 33.411 0.18 0.83 2118.60 19.80 10.328.5352.684400.0056.0854.533465.643409.641335.621750.91546662.606032696.9570°30'0.6017"N149°37'6.0985"W0.7510.7220.630.502201.2720.5810.478.7652.75BH CoilTrak (2019) (Standard) MPU L-06APB2 CoilTrak <10710-11886> MPU L-06APB2BH CoilTrak (2019) (Standard) MPU L-06APB3 CoilTrak<10778-12133> MPU L-06APB3BH Generic gyro - continuous (Standard) L-06 Gyro CT <0-10832.1> MPU L-06BH CoilTrak (2019) (Standard) MPU L-06APB1 CoilTrak <10562-11440> MPU L-06APB1Positional Uncertainty Model Log Name / CommentWellbore149°37'57.6454"W149°37'57.6454"W149°31'31.8215"WHoriz Uncert 1sd[ft]0.000.00[US ft]6031350.916031350.916027347.71Latitude70°29'47.4683"N70°29'47.4683"N70°29'7.2002"N[ft]0.00Grid East[US ft]544919.97544919.97558058.04Slot LocationFacility Reference PtField Reference PtLocal North[ft]0.0054.30°included50-029-22003-72Local East Grid North LongitudeSection AzimuthSurface Position UncertaintyAPI#NAD27 / TM Alaska SP, Zone 4 (5004), US feetTrue0.9999020.35 EastSlotRig on MPU L-06 (RT)Rig on MPU L-06 (RT)Mean Sea Level56.00 ft56.00 ft56.00 ftE 0.00 ftN 0.00 ftMagnetic North is 15.36 degrees East of True North2.00Std DevWA_ANC_DefnProjection SystemNorth ReferenceScaleConvergence at SlotHorizontal Reference PointVertical Reference PointMD Reference PointField Vertical ReferenceRig on MPU L-06 (RT) To Facility Vertical DatumRig on MPU L-06 (RT) To Mean Sea LevelRig on MPU L-06 (RT) to Ground Level at Slot (MPU L-06)Section Origin XSection Origin YDeclinationEllipse Confidence LimitDatabase01/19/22 at 16:06 using WellArchitect 6.0Hilcorp Alaska, LLCNorth Slope, AlaskaMilne PointMPU L PadMPU L-06MPU L-06APB3MPU L-06APB3MPU L-06APB301/14/2022MPU L-06APB2 at 10760.13 MDUlricardMinimum curvatureWellpathWellbore last revised Sidetrack fromUserCalculation methodFieldFacilitySlotWellWellboreActual Wellpath Geographic Report - including Position UncertaintyReport by Baker HughesOperatorAreaPage 1 of 3 4500.00 57.28 54.80 3520.57 3464.57 1383.94 1819.07 546730.47 6032745.68 70°30'1.0768"N 149°37'4.0913"W 1.22 72.735 1.20 0.27 2284.83 21.37 10.639.0052.834590.00 57.46 55.48 3569.10 3513.10 1427.27 1881.27 546792.39 6032789.38 70°30'1.5027"N 149°37'2.2599"W 0.67 71.298 0.20 0.76 2360.61 22.09 10.779.2252.924600.00 57.48 55.55 3574.48 3518.48 1432.04 1888.22 546799.31 6032794.19 70°30'1.5496"N 149°37'2.0553"W 0.62 168.496 0.20 0.70 2369.04 22.17 10.78 9.24 52.934700.00 53.23 56.63 3631.32 3575.32 1477.94 1956.47 546867.27 6032840.50 70°30'2.0009"N 149°37'0.0457"W 4.34 158.363 -4.25 1.08 2451.25 22.96 10.97 9.52 53.054800.00 52.55 56.97 3691.65 3635.65 1521.61 2023.19 546933.73 6032884.56 70°30'2.4302"N149°36'58.0808"W0.73 102.009 -0.68 0.34 2530.92 23.73 11.21 9.90 53.174900.00 52.47 57.45 3752.51 3696.51 1564.58 2089.90 547000.17 6032927.93 70°30'2.8526"N149°36'56.1166"W0.39 105.766 -0.08 0.48 2610.17 24.50 11.39 10.13 53.315000.00 52.32 58.13 3813.54 3757.54 1606.81 2156.93 547066.93 6032970.56 70°30'3.2677"N149°36'54.1429"W0.56 135.231 -0.15 0.68 2689.24 25.27 11.56 10.36 53.475100.00 51.62 59.02 3875.14 3819.14 1647.88 2224.14 547133.89 6033012.03 70°30'3.6714"N149°36'52.1637"W0.99 -14.214 -0.70 0.89 2767.79 26.04 11.74 10.59 53.635200.00 52.72 58.67 3936.47 3880.47 1688.74 2291.73 547201.22 6033053.30 70°30'4.0731"N149°36'50.1734"W1.13 145.983 1.10 -0.35 2846.53 26.82 11.92 10.82 53.805300.00 51.70 59.55 3997.75 3941.75 1729.31 2359.54 547268.78 6033094.28 70°30'4.4719"N149°36'48.1765"W1.23 -53.137 -1.02 0.88 2925.27 27.60 12.10 11.07 53.975400.00 54.82 54.63 4057.59 4001.59 1772.88 2426.74 547335.71 6033138.25 70°30'4.9002"N149°36'46.1978"W5.03 -38.015 3.12 -4.92 3005.26 28.40 12.30 11.33 54.065500.00 55.70 53.80 4114.57 4058.57 1820.94 2493.39 547402.07 6033186.70 70°30'5.3726"N149°36'44.2348"W1.11 163.659 0.88 -0.83 3087.44 29.23 12.50 11.64 54.065600.00 54.18 54.35 4172.01 4116.01 1868.96 2559.67 547468.05 6033235.12 70°30'5.8447"N149°36'42.2828"W1.59 -4.215 -1.52 0.55 3169.29 30.05 12.68 11.89 54.065700.00 55.07 54.27 4229.91 4173.91 1916.53 2625.90 547533.98 6033283.08 70°30'6.3123"N149°36'40.3326"W0.89 32.773 0.89 -0.08 3250.82 30.88 12.87 12.15 54.065800.00 55.30 54.45 4287.00 4231.00 1964.37 2692.62 547600.40 6033331.32 70°30'6.7825"N149°36'38.3676"W0.27 128.727 0.23 0.18 3332.92 31.71 13.05 12.40 54.075900.00 54.65 55.45 4344.39 4288.39 2011.40 2759.66 547667.15 6033378.75 70°30'7.2448"N149°36'36.3934"W1.05 146.873 -0.65 1.00 3414.81 32.55 13.23 12.64 54.096000.00 53.75 56.18 4402.89 4346.89 2056.97 2826.75 547733.95 6033424.72 70°30'7.6928"N149°36'34.4175"W1.08 149.653 -0.90 0.73 3495.88 33.39 13.41 12.88 54.146100.00 52.88 56.82 4462.63 4406.63 2101.24 2893.62 547800.55 6033469.38 70°30'8.1278"N149°36'32.4482"W1.01 5.099 -0.87 0.64 3576.02 34.22 13.60 13.13 54.206200.00 53.42 56.88 4522.60 4466.60 2145.00 2960.61 547867.27 6033513.54 70°30'8.5579"N149°36'30.4751"W0.54 -12.321 0.54 0.06 3655.96 35.06 13.79 13.38 54.276300.00 54.20 56.67 4581.65 4525.65 2189.22 3028.12 547934.51 6033558.17 70°30'8.9925"N149°36'28.4868"W0.80 -11.531 0.78 -0.21 3736.59 35.90 13.98 13.62 54.336400.00 54.68 56.55 4639.80 4583.80 2233.99 3096.05 548002.15 6033603.34 70°30'9.4326"N149°36'26.4863"W0.49 5.577 0.48 -0.12 3817.87 36.76 14.17 13.87 54.396500.00 55.10 56.60 4697.32 4641.32 2279.05 3164.32 548070.15 6033648.81 70°30'9.8754"N149°36'24.4755"W0.42 -34.423 0.42 0.05 3899.61 37.63 14.36 14.12 54.446600.00 55.28 56.45 4754.40 4698.40 2324.34 3232.81 548138.35 6033694.51 70°30'10.3205"N149°36'22.4584"W0.22 -14.781 0.18 -0.15 3981.66 38.50 14.54 14.37 54.496700.00 55.75 56.30 4811.02 4755.02 2369.98 3301.44 548206.70 6033740.56 70°30'10.7691"N149°36'20.4370"W0.49 -117.525 0.47 -0.15 4064.03 39.38 14.73 14.62 54.546800.00 55.60 55.95 4867.41 4811.41 2416.01 3370.01 548274.98 6033787.00 70°30'11.2215"N149°36'18.4174"W0.33 -174.333 -0.15 -0.35 4146.57 40.27 14.92 14.87 54.576900.00 54.13 55.77 4924.96 4868.96 2461.91 3437.69 548342.38 6033833.30 70°30'11.6726"N149°36'16.4239"W1.48 -12.262 -1.47 -0.18 4228.32 41.16 15.11 15.13 54.607000.00 54.58 55.65 4983.24 4927.24 2507.69 3504.83 548409.24 6033879.48 70°30'12.1225"N149°36'14.4463"W0.46 -1.594 0.45 -0.12 4309.56 42.05 15.31 15.39 54.637100.00 55.17 55.63 5040.77 4984.77 2553.85 3572.35 548476.47 6033926.04 70°30'12.5762"N149°36'12.4576"W0.59 -8.62 0.59 -0.02 4391.33 42.94 15.50 15.64 54.657200.00 55.77 55.52 5097.46 5041.46 2600.42 3640.31 548544.13 6033973.02 70°30'13.0339"N149°36'10.4560"W0.61 -4.754 0.60 -0.11 4473.69 43.85 15.70 15.90 54.677299.00 56.27 55.47 5152.79 5096.79 2646.93 3707.96 548611.50 6034019.93 70°30'13.4910"N 149°36'8.4633"W 0.51 0 0.51 -0.05 4555.76 44.76 15.89 16.16 54.697300.00 56.28 55.47 5153.34 5097.34 2647.40 3708.64 548612.18 6034020.41 70°30'13.4956"N 149°36'8.4432"W 1.00 -171.588 1.00 0.00 4556.60 44.77 15.89 16.16 54.697400.00 54.68 55.18 5210.01 5154.01 2694.27 3776.40 548679.65 6034067.68 70°30'13.9562"N 149°36'6.4473"W 1.62 -6.814 -1.60 -0.29 4638.97 45.69 16.09 16.42 54.707500.00 55.23 55.10 5267.43 5211.43 2741.07 3843.58 548746.53 6034114.88 70°30'14.4161"N 149°36'4.4685"W 0.55 1.482 0.55 -0.08 4720.83 46.61 16.29 16.69 54.717600.00 55.87 55.12 5324.00 5268.00 2788.23 3911.22 548813.88 6034162.45 70°30'14.8796"N 149°36'2.4761"W 0.64 -8.281 0.64 0.02 4803.29 47.54 16.49 16.94 54.727700.00 56.27 55.05 5379.82 5323.82 2835.72 3979.26 548881.62 6034210.34 70°30'15.3463"N 149°36'0.4719"W 0.40 -23.961 0.40 -0.07 4886.25 48.48 16.68 17.20 54.737800.00 56.42 54.97 5435.24 5379.24 2883.46 4047.45 548949.52 6034258.48 70°30'15.8154"N149°35'58.4631"W0.16 -24.196 0.15 -0.08 4969.48 49.43 16.88 17.46 54.737900.00 56.55 54.90 5490.45 5434.45 2931.35 4115.69 549017.46 6034306.79 70°30'16.2861"N149°35'56.4529"W0.14 -173.977 0.13 -0.07 5052.85 50.39 17.07 17.72 54.748000.00 56.00 54.83 5545.97 5489.97 2979.22 4183.71 549085.18 6034355.06 70°30'16.7565"N149°35'54.4492"W0.55 -19.639 -0.55 -0.07 5136.02 51.35 17.27 17.98 54.748100.00 56.35 54.68 5601.64 5545.64 3027.16 4251.55 549152.73 6034403.40 70°30'17.2276"N149°35'52.4506"W0.37 -22.062 0.35 -0.15 5219.09 52.31 17.47 18.25 54.748200.00 56.68 54.52 5656.81 5600.81 3075.47 4319.54 549220.42 6034452.12 70°30'17.7023"N149°35'50.4478"W0.36 -122.642 0.33 -0.16 5302.49 53.28 17.67 18.51 54.748300.00 56.10 53.42 5712.17 5656.17 3124.46 4386.89 549287.46 6034501.51 70°30'18.1837"N149°35'48.4637"W1.08 -35.13 -0.58 -1.10 5385.77 54.26 17.87 18.77 54.728400.00 56.42 53.15 5767.71 5711.71 3174.17 4453.55 549353.81 6034551.62 70°30'18.6722"N149°35'46.4999"W0.39 180 0.32 -0.27 5468.91 55.24 18.07 19.04 54.708500.00 54.77 53.15 5824.21 5768.21 3223.65 4519.57 549419.53 6034601.49 70°30'19.1584"N149°35'44.5549"W1.65 -11.246 -1.65 0.00 5551.40 56.22 18.27 19.30 54.678600.00 55.10 53.07 5881.66 5825.66 3272.78 4585.03 549484.69 6034651.01 70°30'19.6412"N149°35'42.6263"W0.34 9.679 0.33 -0.08 5633.23 57.20 18.48 19.57 54.648700.00 55.73 53.20 5938.42 5882.42 3322.17 4650.90 549550.25 6034700.80 70°30'20.1266"N149°35'40.6857"W0.64 8.476 0.63 0.13 5715.54 58.19 18.69 19.84 54.628800.00 56.12 53.27 5994.45 5938.45 3371.75 4717.25 549616.29 6034750.77 70°30'20.6137"N149°35'38.7308"W0.39 -6.942 0.39 0.07 5798.36 59.19 18.90 20.10 54.598900.00 56.60 53.20 6049.85 5993.85 3421.58 4783.95 549682.68 6034800.99 70°30'21.1034"N149°35'36.7658"W0.48 169.561 0.48 -0.07 5881.60 60.20 19.10 20.37 54.579000.00 55.35 53.48 6105.80 6049.80 3471.07 4850.43 549748.85 6034850.88 70°30'21.5896"N149°35'34.8070"W1.27 -0.731 -1.25 0.28 5964.46 61.22 19.31 20.64 54.559100.00 56.00 53.47 6162.19 6106.19 3520.22 4916.80 549814.91 6034900.42 70°30'22.0726"N149°35'32.8517"W0.65 -7.38 0.65 -0.01 6047.04 62.23 19.52 20.91 54.539200.00 56.58 53.38 6217.69 6161.69 3569.79 4983.60 549881.41 6034950.39 70°30'22.5596"N149°35'30.8835"W0.58 -20.581 0.58 -0.09 6130.22 63.26 19.73 21.17 54.519300.00 56.87 53.25 6272.55 6216.55 3619.73 5050.64 549948.15 6035000.73 70°30'23.0504"N149°35'28.9080"W0.31 174.095 0.29 -0.13 6213.81 64.30 19.93 21.44 54.499400.00 55.83 53.38 6327.97 6271.97 3669.46 5117.40 550014.59 6035050.86 70°30'23.5390"N149°35'26.9412"W1.05 -176.914 -1.04 0.13 6297.04 65.34 20.14 21.71 54.479500.00 54.62 53.30 6385.00 6329.00 3718.51 5183.29 550080.18 6035100.30 70°30'24.0209"N149°35'24.9997"W1.21 161.097 -1.21 -0.08 6379.17 66.38 20.36 21.98 54.459600.00 54.43 53.38 6443.04 6387.04 3767.13 5248.62 550145.21 6035149.31 70°30'24.4986"N149°35'23.0748"W0.20 -77.962 -0.19 0.08 6460.59 67.41 20.58 22.25 54.449700.00 54.82 51.25 6500.93 6444.93 3816.97 5313.14 550209.42 6035199.54 70°30'24.9884"N149°35'21.1737"W1.78 -8.585 0.39 -2.13 6542.07 68.44 20.79 22.52 54.409800.00 55.53 51.12 6558.04 6502.04 3868.43 5377.10 550273.06 6035251.37 70°30'25.4940"N149°35'19.2889"W0.72 -5.89 0.71 -0.13 6624.04 69.49 21.01 22.78 54.359900.00 56.50 51.00 6613.94 6557.94 3920.54 5441.59 550337.23 6035303.87 70°30'26.0060"N149°35'17.3885"W0.98 170.462 0.97 -0.12 6706.83 70.56 21.22 23.06 54.3010000.00 53.95 51.53 6670.97 6614.97 3971.94 5505.66 550400.98 6035355.65 70°30'26.5111"N149°35'15.5006"W2.59 101.74 -2.55 0.53 6788.84 71.62 21.45 23.33 54.2610100.00 53.90 51.83 6729.85 6673.85 4022.05 5569.07 550464.08 6035406.14 70°30'27.0035"N149°35'13.6320"W0.25 130.042 -0.05 0.30 6869.58 72.67 21.68 23.62 54.2210200.00 53.63 52.23 6788.96 6732.96 4071.68 5632.65 550527.36 6035456.15 70°30'27.4910"N149°35'11.7583"W0.42 80.289 -0.27 0.40 6950.18 73.73 21.90 23.89 54.1910300.00 53.72 52.87 6848.20 6792.20 4120.67 5696.61 550591.01 6035505.52 70°30'27.9724"N 149°35'9.8735"W 0.52 36.806 0.09 0.64 7030.71 74.79 22.13 24.15 54.1610400.00 54.85 53.90 6906.57 6850.57 4169.09 5761.79 550655.88 6035554.32 70°30'28.4481"N 149°35'7.9530"W 1.41 43.865 1.13 1.03 7111.89 75.87 22.35 24.42 54.1510500.00 55.60 54.77 6963.61 6907.61 4216.98 5828.52 550722.32 6035602.61 70°30'28.9185"N 149°35'5.9865"W 1.04 109.435 0.75 0.87 7194.02 76.97 22.57 24.69 54.1510562.00 55.43 55.36 6998.71 6942.71 4246.24 5870.41 550764.03 6035632.12 70°30'29.2060"N 149°35'4.7519"W 0.83 7.726 -0.27 0.95 7245.13 77.31 23.89 24.62 54.1310582.27 59.50 56.00 7009.61 6953.61 4255.87 5884.53 550778.09 6035641.84 70°30'29.3006"N 149°35'4.3361"W 20.25 13.129 20.08 3.16 7262.21 77.3223.91 24.63 54.1310612.24 71.85 59.00 7021.94 6965.94 4270.49 5907.53 550801.00 6035656.59 70°30'29.4442"N 149°35'3.6582"W 42.20 36.747 41.21 10.01 7289.41 77.3523.9624.6654.1310640.23 80.58 65.51 7028.61 6972.61 4283.10 5931.56 550824.95 6035669.34 70°30'29.5680"N 149°35'2.9501"W 38.49 112.179 31.19 23.26 7316.29 77.39 24.01 24.73 54.1310670.38 76.04 77.57 7034.73 6978.73 4292.45 5959.50 550852.83 6035678.86 70°30'29.6597"N 149°35'2.1272"W 41.95 103.743 -15.06 40.00 7344.43 77.46 24.04 24.77 54.1510700.68 73.43 90.16 7042.74 6986.74 4295.59 5988.49 550881.80 6035682.17 70°30'29.6903"N 149°35'1.2732"W 40.99 92.016 -8.61 41.55 7369.81 77.56 24.09 24.80 54.2010710.00 73.33 94.40 7045.41 6989.41 4295.23 5997.41 550890.72 6035681.87 70°30'29.6868"N 149°35'1.0105"W 43.61 -151.997 -1.07 45.49 7376.84 78.21 23.77 24.34 53.6310730.30 70.17 92.61 7051.77 6995.77 4294.05 6016.65 550909.96 6035680.81 70°30'29.6750"N 149°35'0.4439"W 17.68 -102.38 -15.57 -8.82 7391.78 78.23 23.80 24.35 53.6410760.13 69.58 89.62 7062.03 7006.03 4293.50 6044.65 550937.96 6035680.43 70°30'29.6694"N149°34'59.6193"W9.62 -94.024 -1.98 -10.02 7414.20 78.27 23.87 24.36 53.68 Tie on to MPU L-06APB210778.00 69.45 87.44 7068.29 7012.29 4293.93 6061.38 550954.69 6035680.96 70°30'29.6735"N149°34'59.1264"W11.45 -5.398 -0.73 -12.20 7428.04 78.23 24.01 24.50 53.75 Top of WS10805.98 73.93 87.00 7077.07 7021.07 4295.22 6087.91 550981.21 6035682.41 70°30'29.6860"N149°34'58.3452"W16.08 -38.312 16.01 -1.57 7450.33 78.27 24.07 24.51 53.78 Interpolated Az10830.42 76.40 85.00 7083.33 7027.33 4296.87 6111.47 551004.76 6035684.20 70°30'29.7020"N149°34'57.6511"W12.83 -60.92 10.11 -8.18 7470.43 78.32 24.14 24.52 53.81 Interpolated Az10860.57 78.33 81.50 7089.93 7033.93 4300.33 6140.68 551033.94 6035687.84 70°30'29.7358"N149°34'56.7908"W13.01 -39.776 6.40 -11.61 7496.17 78.39 24.23 24.53 53.87 Interpolated Az10890.48 81.31 79.00 7095.21 7039.21 4305.32 6169.69 551062.92 6035693.00 70°30'29.7846"N149°34'55.9363"W12.92 -36.919 9.96 -8.36 7522.64 78.48 24.33 24.54 53.93 Interpolated Az10920.49 84.90 76.30 7098.82 7042.82 4311.69 6198.79 551091.97 6035699.55 70°30'29.8471"N149°34'55.0792"W14.93 -17.156 11.96 -9.00 7549.98 78.58 24.44 24.56 54.0110950.48 88.40 75.22 7100.57 7044.57 4319.06 6227.80 551120.94 6035707.09 70°30'29.9192"N149°34'54.2246"W12.21 -32.695 11.67 -3.60 7577.84 78.71 24.54 24.58 54.0910980.56 90.80 73.68 7100.78 7044.78 4327.12 6256.77 551149.86 6035715.33 70°30'29.9983"N149°34'53.3710"W9.48 -84.959 7.98 -5.12 7606.08 78.84 24.64 24.60 54.1811010.60 91.10 70.26 7100.28 7044.28 4336.41 6285.33 551178.36 6035724.79 70°30'30.0895"N149°34'52.5297"W11.43 -98.162 1.00 -11.38 7634.69 79.00 24.74 24.62 54.2811040.48 90.68 67.34 7099.82 7043.82 4347.22 6313.18 551206.14 6035735.76 70°30'30.1955"N149°34'51.7091"W9.87 -84.312 -1.41 -9.77 7663.61 79.17 24.83 24.64 54.3711070.58 90.95 64.62 7099.39 7043.39 4359.47 6340.67 551233.55 6035748.18 70°30'30.3157"N149°34'50.8993"W9.08 -101.257 0.90 -9.04 7693.08 79.36 24.91 24.66 54.4611100.57 90.28 61.26 7099.07 7043.07 4373.11 6367.37 551260.17 6035761.98 70°30'30.4496"N149°34'50.1125"W11.42 -36.975 -2.23 -11.20 7722.73 79.56 24.97 24.68 54.5511130.64 92.92 59.27 7098.23 7042.23 4388.01 6393.47 551286.17 6035777.04 70°30'30.5960"N149°34'49.3435"W10.99 -88.27 8.78 -6.62 7752.62 79.78 25.02 24.71 54.6311160.53 93.01 56.14 7096.68 7040.68 4403.96 6418.70 551311.30 6035793.14 70°30'30.7526"N149°34'48.6000"W10.46 -76.556 0.30 -10.47 7782.41 80.00 25.06 24.74 54.7011190.4893.7852.897094.917038.914421.316443.04551335.536035810.6370°30'30.9231"N149°34'47.8827"W11.13-103.8362.57-10.857812.3180.2425.0824.7654.76Page 2 of 3 11220.44 92.95 49.54 7093.15 7037.15 4440.04 6466.35 551358.73 6035829.50 70°30'31.1071"N149°34'47.1957"W11.50 -101.819 -2.77 -11.18 7842.17 80.48 25.09 24.80 54.8111250.69 92.09 45.46 7091.82 7035.82 4460.46 6488.63 551380.88 6035850.05 70°30'31.3077"N149°34'46.5391"W13.77 -120.117 -2.84 -13.49 7872.17 80.73 25.09 24.83 54.8411282.05 91.08 43.72 7090.95 7034.95 4482.78 6510.63 551402.75 6035872.50 70°30'31.5270"N149°34'45.8904"W6.41 -141.224 -3.22 -5.55 7903.06 80.99 25.07 24.87 54.8511310.51 89.20 42.21 7090.88 7034.88 4503.60 6530.03 551422.01 6035893.44 70°30'31.7317"N149°34'45.3186"W8.47 -128.597 -6.61 -5.31 7930.97 81.23 25.06 24.91 54.8611340.50 86.89 39.31 7091.90 7035.90 4526.30 6549.59 551441.44 6035916.26 70°30'31.9547"N149°34'44.7417"W12.36 -43.983 -7.70 -9.67 7960.10 81.49 25.04 24.95 54.8511370.54 88.86 37.41 7093.02 7037.02 4549.84 6568.22 551459.92 6035939.90 70°30'32.1860"N149°34'44.1925"W9.11 116.382 6.56 -6.32 7988.96 81.75 25.01 25.00 54.8311400.45 87.42 40.32 7093.99 7037.99 4573.11 6586.98 551478.54 6035963.29 70°30'32.4148"N149°34'43.6395"W10.85 93.012 -4.81 9.73 8017.78 82.02 25.00 25.04 54.8111430.55 87.20 44.65 7095.40 7039.40 4595.28 6607.28 551498.70 6035985.57 70°30'32.6326"N149°34'43.0409"W14.39 70.448 -0.73 14.39 8047.20 82.31 24.99 25.09 54.7911460.39 88.49 48.27 7096.52 7040.52 4615.82 6628.89 551520.19 6036006.24 70°30'32.8344"N149°34'42.4039"W12.87 71.488 4.32 12.13 8076.73 82.64 25.00 25.14 54.7911490.42 89.57 51.49 7097.03 7041.03 4635.16 6651.85 551543.02 6036025.72 70°30'33.0244"N149°34'41.7272"W11.31 59.269 3.60 10.72 8106.67 82.98 25.01 25.19 54.8011520.40 91.81 55.26 7096.67 7040.67 4653.04 6675.90 551566.97 6036043.74 70°30'33.2001"N149°34'41.0183"W14.63 94.983 7.47 12.58 8136.63 83.35 25.04 25.25 54.8311550.46 91.50 58.78 7095.80 7039.80 4669.40 6701.10 551592.07 6036060.25 70°30'33.3607"N149°34'40.2756"W11.75 90.946 -1.03 11.71 8166.64 83.74 25.07 25.31 54.8711580.66 91.44 62.25 7095.03 7039.03 4684.25 6727.38 551618.25 6036075.26 70°30'33.5066"N149°34'39.5013"W11.49 -73.024 -0.20 11.49 8196.65 84.15 25.11 25.36 54.9311610.48 92.61 58.40 7093.97 7037.97 4699.01 6753.27 551644.05 6036090.17 70°30'33.6514"N149°34'38.7384"W13.49 -80.932 3.92 -12.91 8226.28 84.56 25.15 25.42 55.0011640.29 93.10 55.30 7092.49 7036.49 4715.28 6778.19 551668.87 6036106.59 70°30'33.8113"N149°34'38.0038"W10.52 -81.691 1.64 -10.40 8256.02 84.98 25.19 25.48 55.0511670.21 93.50 52.53 7090.77 7034.77 4732.88 6802.33 551692.90 6036124.33 70°30'33.9841"N149°34'37.2924"W9.34 -76.741 1.34 -9.26 8285.89 85.41 25.21 25.55 55.0811700.38 94.52 48.14 7088.65 7032.65 4752.08 6825.49 551715.94 6036143.67 70°30'34.1727"N149°34'36.6097"W14.90 -123.45 3.38 -14.55 8315.90 85.84 25.22 25.61 55.0911730.56 93.45 46.52 7086.56 7030.56 4772.48 6847.62 551737.95 6036164.21 70°30'34.3732"N149°34'35.9572"W6.42 -173.696 -3.55 -5.37 8345.79 86.26 25.22 25.68 55.0811761.31 90.28 46.17 7085.56 7029.56 4793.70 6869.86 551760.05 6036185.55 70°30'34.5816"N149°34'35.3018"W10.37 -178.311 -10.31 -1.14 8376.22 86.70 25.23 25.75 55.0611790.66 87.23 46.08 7086.19 7030.19 4814.03 6891.01 551781.08 6036206.01 70°30'34.7814"N149°34'34.6783"W10.40 -165.515 -10.39 -0.31 8405.26 87.13 25.23 25.83 55.0411820.72 84.34 45.33 7088.40 7032.40 4834.97 6912.46 551802.40 6036227.07 70°30'34.9871"N149°34'34.0458"W9.93 -80.605 -9.61 -2.50 8434.90 87.58 25.24 25.91 55.0211850.53 84.83 42.40 7091.22 7035.22 4856.36 6933.03 551822.83 6036248.59 70°30'35.1973"N149°34'33.4395"W9.92 -81.908 1.64 -9.83 8464.08 88.02 25.24 25.99 54.9811880.63 85.30 39.14 7093.81 7037.81 4879.07 6952.61 551842.27 6036271.41 70°30'35.4205"N149°34'32.8622"W10.90 -75.115 1.56 -10.83 8493.23 88.45 25.24 26.06 54.9211910.54 86.25 35.59 7096.01 7040.01 4902.77 6970.70 551860.23 6036295.22 70°30'35.6534"N149°34'32.3284"W12.26 -138.186 3.18 -11.87 8521.76 88.87 25.24 26.14 54.8511940.42 83.62 33.22 7098.65 7042.65 4927.32 6987.52 551876.89 6036319.87 70°30'35.8947"N149°34'31.8325"W11.83 -142.331 -8.80 -7.93 8549.75 89.28 25.24 26.23 54.7611970.57 80.71 30.94 7102.76 7046.76 4952.63 7003.38 551892.60 6036345.27 70°30'36.1434"N149°34'31.3645"W12.22 -137.778 -9.65 -7.56 8577.39 89.68 25.24 26.32 54.6612001.20 78.94 29.30 7108.17 7052.17 4978.70 7018.51 551907.57 6036371.43 70°30'36.3997"N149°34'30.9182"W7.82 -150.118 -5.78 -5.35 8604.90 90.07 25.24 26.41 54.5512031.93 75.74 27.40 7114.91 7058.91 5005.08 7032.75 551921.65 6036397.90 70°30'36.6590"N149°34'30.4981"W12.03 -95.667 -10.41 -6.18 8631.85 90.46 25.26 26.50 54.4312060.59 75.58 25.67 7122.00 7066.00 5029.92 7045.15 551933.90 6036422.81 70°30'36.9032"N149°34'30.1320"W5.87 105.052 -0.56 -6.04 8656.42 90.80 25.27 26.59 54.3112090.34 74.73 29.04 7129.63 7073.63 5055.46 7058.36 551946.95 6036448.42 70°30'37.1542"N149°34'29.7422"W11.32 81.166 -2.86 11.33 8682.05 91.17 25.30 26.68 54.1812100.04 74.99 30.73 7132.16 7076.16 5063.58 7063.03 551951.57 6036456.57 70°30'37.2340"N149°34'29.6046"W17.03 0 2.68 17.42 8690.58 91.30 25.31 26.71 54.1412133.0074.9930.737140.707084.705090.947079.30551967.676036484.0370°30'37.5030"N149°34'29.1247"W0.00N/A0.000.008719.7691.7425.3426.8154.01Projection to TDPage 3 of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´[´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y Samantha Carlisle at 1:17 pm, Mar 11, 2022  'LJLWDOO\VLJQHGE\'DYLG +DDNLQVRQ  '1FQ 'DYLG+DDNLQVRQ   RX 8VHUV 'DWH  'DYLG+DDNLQVRQ  0*50$5  '656)'  GWV -/&  Jeremy Price Digitally signed by Jeremy Price Date: 2022.03.31 09:56:31 -08'00' RBDMS SJC 040522 d&KΘŵƚ^Ƌnj tĞůů͗DWh>ͲϬϲ ĂƚĞ͗ϬϯͬϬϵͬϮϬϮϮ tĞůůEĂŵĞ͗DWh>ͲϬϲW/EƵŵďĞƌ͗ϱϬͲϬϮϵͲϮϮϬϬϯͲϬϭͲϬϬ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗KŝůtĞůů΀WůƵŐŐĞĚ>ĂƚĞƌĂů΁ WĂĚ͗>ͲWĂĚ ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗DĂƌĐŚϮϭ͕ϮϬϮϮ ZŝŐ͗ŽŝůdƵďŝŶŐ ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛Ě͍zĞƐ ĂƚĞZĞŐ͘ƉƉƌŽǀĂůZĞĐ͛ǀĚ͗ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗dŽŵ&ŽƵƚƐ WĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗ϮϮϭͲϬϭϭ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗dĂLJůŽƌtĞůůŵĂŶ ;ϵϬϳͿϳϳϳͲϴϰϰϵ;KͿ ;ϵϬϳͿϵϰϳͲϵϱϯϯ;DͿ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗dĞĚ<ƌĂŵĞƌ ;ϵϬϳͿϳϳϳͲϴϰϮϬ;KͿ ;ϵϴϱͿϴϲϳͲϬϲϲϱ;DͿ &XUUHQW%RWWRP+ROH3UHVVXUH SVL#¶79' '+*DXJHGD\VKXWLQSSJ(0: 0D[LPXP([SHFWHG%+3SVL#¶79' '+*DXJHGD\VKXWLQSSJ(0: 0363SVL SVLIWJDVJUDGLHQW ƌŝĞĨtĞůů^ƵŵŵĂƌLJ͗ DWh>ͲϬϲƐŝĚĞƚƌĂĐŬĞĚǁŝƚŚdŝŶEŽǀĞŵďĞƌϮϬϮϭ͘dŚĞŝŶŝƚŝĂůƐŝĚĞƚƌĂĐŬĂƚƚĞŵƉƚƐǁĞƌĞƉĞƌĨŽƌŵĞĚŝŶ:ƵŶĞ ϮϬϮϭĂŶĚƚĂƌŐĞƚĞĚƚŽƚŚĞƐŽƵƚŚĞƌŶĨĂƵůƚďůŽĐŬďƵƚƉƌŽǀĞĚƚŽďĞǁĞƚ͘dŚĞϮŶĚĂƚƚĞŵƉƚǁĞŶƚƚŽƚŚĞŶŽƌƚŚĞƌŶ ĨĂƵůƚďůŽĐŬĂŶĚƌĞƐƵůƚĞĚŝŶůĞĂǀŝŶŐĂϯͲϭͬϰ͟ƐŽůŝĚůŝŶĞƌƚŽƌĞƉůĂŶƚŚĞĨĂƵůƚƐ͘ZͲϮǁĂƐƉƵƚďĂĐŬŽŶƚŚĞǁĞůůŝŶ EŽǀĞŵďĞƌϮϬϮϭĂŶĚƐƵĐĐĞƐƐĨƵůůLJƐŝĚĞƚƌĂĐŬĞĚŽƵƚŽĨƚŚĞϯͲϭͬϰ͟ůŝŶĞƌĂŶĚƉůĂĐĞĚĂŚŽƌŝnjŽŶƚĂůĂĐƌŽƐƐƚŚĞ<ƵƉĂƌƵŬ ϯ͕ϮĂŶĚϭƐĂŶĚƐ͘dŚĞϭƐĂŶĚƐǁĞƌĞǁĞƚĂŶĚƉůƵŐŐĞĚďĂĐŬ͘dŚĞǁĞůůǁĂƐĨƌĞĞĨůŽǁĞĚĨŽƌĂƐŚŽƌƚƉĞƌŝŽĚŽĨ ƚŝŵĞƉƌŝŽƌƚŽƐĞƚƚŝŶŐĂůŝŶĞƌƚŽƉƉĂĐŬĞƌĂŶĚĂũĞƚƉƵŵƉ͘dŚĞ>dWĚŝĚŶŽƚƉĂƐƐĂƚĞƐƚĂŶĚǁĂƐƉƵůůĞĚͬƌĞƉůĂĐĞĚ͘ dŚĞǁĞůůǁĂƐďƌŽƵŐŚƚďĂĐŬŽŶůŝŶĞǁŝƚŚĂũĞƚƉƵŵƉĂŶĚƚŚĞůŝŶĞƌƉĂĐŬĞĚŽĨĨǁŝƚŚƐŽůŝĚƐ͘DƵůƚŝƉůĞĂƚƚĞŵƉƚƐƚŽ ĐůĞĂƌƚŚĞůŝŶĞƌƵƐŝŶŐĚŝĨĨĞƌĞŶƚŝĂůƉƌĞƐƐƵƌĞĂŶĚďĂŝůŝŶŐŚĂǀĞďĞ ĞŶƉĞƌĨŽƌŵĞĚ͘ EŽƚĞƐZĞŐĂƌĚŝŶŐtĞůůďŽƌĞŽŶĚŝƚŝŽŶ x dŚĞĨĂƵůƚďůŽĐŬǁŝƚŚƚŚĞŵŽƚŚĞƌďŽƌĞĂŶĚƚŚĞƐŽůŝĚůŝŶĞƌƐĞĐƚŝŽŶƐŽĨƚŚĞƐŝĚĞƚƌĂĐŬƐŝƐŽǀĞƌƉƌĞƐƐƵƌĞĚĂƚ ϯ͕ϵϬϬƉƐŝ͘dŚĞŶŽƌƚŚĞƌŶĨĂƵůƚďůŽĐŬŝƐĂƚΕϮ͕ϰϬϬƉƐŝ͘ x ƉŽƐƐŝďůĞƐŽůŝĚƐƉƌŽĚƵĐƚŝŽŶƉĂƚŚĞdžŝƐƚƐŝŶƚŚĞŽƉĞŶŚŽůĞƐĞĐƚŝŽŶ͘dŚĞƉŽƐƐŝďůĞĨůŽǁƉĂƚŚŝƐƵƉĂƌŽƵŶĚ ƚŚĞǁŚŝƉƐƚŽĐŬ͕ŽƵƚƐŝĚĞƚŚĞƐŽůŝĚůŝŶĞƌĨůŽǁŝŶŐĚŽǁŶƚŚĞƐŝĚĞƚƌ ĂĐŬƚŽĞŶƚĞƌƚŚĞƐůŽƚƚĞĚůŝŶĞƌ͘ x DŝŶ/сϭ͘ϵϵϱ͟ x ϭ͘ϱ͟dZĞƋƵŝƌĞĚĨŽƌƚŚŝƐũŽď͘ KďũĞĐƚŝǀĞ͗ ϭ͘ ůĞĂŶŽƵƚƚŚĞůĂƚĞƌĂůĨƌŽŵƐŽůŝĚƐ͘ Ϯ͘ WƵŵƉĐĞŵĞŶƚƚŽŝƐŽůĂƚĞƐŽůŝĚƐƉƌŽĚƵĐƚŝŽŶ͘ ^ůŝĐŬůŝŶĞ;EŽŶͲƐƵŶĚƌŝĞĚƐƚĞƉƐͿ͗ ϭ͘ Zh^>ƵŶŝƚĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚWƚŽϮϱϬƉƐŝͬϮ͕ϱϬϬƉƐŝŚŝŐŚ͘ Ϯ͘ WƵůů:WĨƌŽŵϭϬ͕Ϯϴϴ͛ŵĚ͘ ϯ͘ ƌŝĨƚͬƚĂŐĂŶĚŽďƚĂŝŶƐĂŵƉůĞŽĨƐŽůŝĚƐ͘ ϰ͘ ^ŚŝĨƚ^^ĐůŽƐĞĚĂƚϭϬ͕Ϯϴϴ͛ŵĚ͘ ϱ͘ Z^>hŶŝƚ͘ ŽŝůdƵďŝŶŐ͗ ϲ͘ D/ZhdƵŶŝƚĂŶĚƐƵƉƉŽƌƚĞƋƵŝƉŵĞŶƚ͘&ŝůůƵƉƌŝŐŚƚƐǁŝƚŚƐŽƵƌĐ ĞǁĂƚĞƌ͘ d&KΘŵƚ^Ƌnj tĞůů͗DWh>ͲϬϲ ĂƚĞ͗ϬϯͬϬϵͬϮϬϮϮ ϳ͘ WƌĞƐƐƵƌĞƚĞƐƚKWƚŽ ϯ͕ϱϬϬƉƐŝ,ŝϮϱϬ>Žǁ͕ϭϬŵŝŶ,ŝŐŚ͕ϱŵŝŶ>ŽǁĞĂĐŚƚĞƐƚ͘ Ă͘ /ĨKWƚĞƐƚŚĂƐŶŽƚďĞĞŶĐŽŵƉůĞƚĞĚŝŶůĂƐƚϳĚĂLJƐ͕ƚĞƐƚWƚŽϮϱϬƉƐŝŐůŽǁͬϯ͕ϱϬϬƉƐŝŐŚŝŐŚ͘ ď͘ EŽK'ŶŽƚŝĨŝĐĂƚŝŽŶƌĞƋƵŝƌĞĚ͘ Đ͘ ZĞĐŽƌĚKWƚĞƐƚƌĞƐƵůƚƐŽŶϭϬͲϰϮϰĨŽƌŵ͘ Ě͘ /ĨǁŝƚŚŝŶƚŚĞƐƚĂŶĚĂƌĚϳͲĚĂLJƚĞƐƚKWƚĞƐƚƉĞƌŝŽĚ͕ĂĨƵůůďŽĚLJƚĞƐƚĂŶĚĨƵŶĐƚŝŽŶƚĞƐƚŽĨƚŚĞ ƌĂŵƐŝƐƐƵĨĨŝĐŝĞŶƚƚŽŵĞĞƚǁĞĞŬůLJKWƚĞƐƚƌĞƋƵŝƌĞŵĞŶƚ͘ Ğ͘ ĂĐŚƐƵďƐĞƋƵĞŶƚƚĞƐƚŽĨƚŚĞůƵďƌŝĐĂƚŽƌǁŝůůďĞƚŽ ϯ͕ϱϬϬƉƐŝ,ŝϮϱϬ>ŽǁƚŽĐŽŶĨŝƌŵŶŽůĞĂŬƐ͘ ϴ͘ Dh&K,ƚŽΕϭϬ͕ϱϬϬ͛ŵĚ͘KďƚĂŝŶWhǁĞŝŐŚƚƐĂŶĚZ/,ƚŽĚƌLJƚĂŐ͘ ϵ͘ ƌŝŶŐƉƵŵƉƐŽŶůŝŶĞĂŶĚďĞŐŝŶ&K͘ Ă͘ ,ŽůĚΕϵϱϬƉƐŝŽŶƚŚĞĐŚŽŬĞƌĞƚƵƌŶůŝŶĞƚŽƚŚĞƚĂŶŬƐƚŽƉƌĞǀĞŶƚǁĞůůĨƌŽŵĨůŽǁŝŶŐĂŶĚ ŝŶĨůƵdžŝŶŐĂĚĚŝƚŝŽŶĂůƐŽůŝĚƐ͘ĚũƵƐƚďĂĐŬƉƌĞƐƐƵƌĞŚĞůĚĂƚt^DĚ ŝƐĐƌĞƚŝŽŶ͘ ď͘ DĂŬĞƐŚŽƌƚƚƌŝƉƐĂƐŶĞĞĚĞĚďĂĐŬŽƵƚĂďŽǀĞƚŚĞ>dWƚŽĐůĞĂƌƐŽůŝĚƐ͘ Đ͘ DŽŶŝƚŽƌƌĞƚƵƌŶƐĂŶĚƚĂŬĞƐĂŵƉůĞƐĚƵƌŝŶŐ&KƚŽĐŚĞĐŬĨŽƌǁŚĞŶůŝŶĞƌĂƉƉĞĂƌƐĐůĞĂƌ͘ WƌŽĚƵĐƚŝŽŶůŽŐƐǁŝůůďĞĞdžƚƌĞŵĞůLJĚŝĨĨŝĐƵůƚ;ĂƚƚŚŝƐŚŽůĞĂŶŐůĞĂŶĚǁŝƚŚϭ͘ϱ͟dŝŶƐŝĚĞŽĨϮͲ ϯͬϴ͟ůŝŶĞƌͿ͘dŚŝƐŵĂLJďĞƚŚĞďĞƐƚŝŶĚŝĐĂƚŽƌŽĨƐŽŝůĚƐĞŶƚƌLJƉŽ ŝŶƚŝŶƚŽǁĞůůďŽƌĞ͘ ϭϬ͘ KŶĐĞƐŽůŝĚƐĨƌĞĞƐĞĐƚŝŽŶŽĨůŝŶĞƌƌĞĂĐŚĞĚŽƌWdĂƚϭϮ͕ϱϬϱ͛ŝƐƌĞĂĐŚĞĚ͕ƉƵŵƉĨŝŶĂůƐǁĞĞƉĂŶĚ ĐŚĂƐĞKK,ĂƚϴϬй͘ ϭϭ͘ tĂƐŚ>dWĂŶĚ^^ŽŶǁĂLJŽƵƚŽĨŚŽůĞ͘ Ă͘ /ĨĐŽŶƚŝŶŐĞŶĐLJƉůĂŶďĞůŽǁŝƐŶŽƚƚŽďĞĞdžĞĐƵƚĞĚ͕ĨƌĞĞnjĞƉƌŽƚĞĐƚǁĞůůŽŶǁĂLJŽƵƚŽĨŚŽůĞ͘ ŽŶƚŝŶŐĞŶĐLJ ;ƉƉƌŽǀĞĚ^ƵŶĚƌLJZĞƋƵŝƌĞĚͿ ʹ/ĨĐůĞĂƌƐĂŶĚĞŶƚƌLJƉŽŝŶƚŝƐĂƚƚŚĞƚŽƉŽĨƚŚĞƐůŽƚƚĞĚůŝŶĞƌƐĞĐƚŝŽŶŝƐ ŝĚĞŶƚŝĨŝĞĚ͘ ϭϮ͘ DhĚƌŝĨƚĨŽƌϮͲϯͬϴ͟/WǁͬŵĞŵŽƌLJ'Zͬ>ůŽŐŐŝŶŐƚŽŽůƐ͘ƌŝĨƚƚŽΕϭϭ͕ϮϱϬ͛ŵĚ͘>ŽŐĨƌŽŵϭϭ͕ϮϱϬ͛ ʹϭϬ͕ϲϬϬ͛ŵĚĂƚϯϬĨƉŵĂŶĚƉĂŝŶƚĨůĂŐĂƚϭϬ͕ϴϱϬ͛ŵĚ͘ Ă͘ ŽǁŶůŽĂĚĚĂƚĂĂŶĚƐĞŶĚůŽŐƚŽ'ĞŽůŽŐŝƐƚ:ŽŚŶ^ĂůƐďƵƌLJĂƚ ũƐĂůƐďƵƌLJΛŚŝůĐŽƌƉ͘ĐŽŵ ;ϵϬϳͿϯϱϬͲϭϬϴϴĂŶĚdĂLJůŽƌtĞůůŵĂŶĂƚ ƚǁĞůůŵĂŶΛŚŝůĐŽƌƉ͘ĐŽŵ;ϵϬϳͿϵϰϳͲϵϱϯϯĨŽƌĚĞƉƚŚ ĐŽƌƌĞůĂƚŝŽŶ͘ ϭϯ͘ Z/,ǁͬϮͲϯͬϴ͟/WĂŶĚĚĞƉƚŚĐŽƌƌĞĐƚĂƚĨůĂŐĚĞƉƚŚ͘^Ğƚ/WĂƚцϭϬ͕ϵϯϬ͛ŵĚ͘dĂŐƉůƵŐƚŽĐŽŶĨŝƌŵ ƐĞƚĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚƉůƵŐƚŽϭ͕ϱϬϬƉƐŝĨŽƌϱŵŝŶƚŽĐŚĞĐŬĨŽƌŐŽŽĚƐĞƚ͘ ϭϰ͘ Z/,ǁͬϮ͛ŽĨƚƵďŝŶŐƉƵŶĐŚĐŚĂƌŐĞƐ͘dĂŐ/W͘WhĂŶĚƉƵŶĐŚƚƵďŝŶŐĨƌŽŵцϭϬ͕ϵϮϬ͛ͲϭϬ͕ϵϮϱ͛ŵĚ͘ WƵŵƉĚŽǁŶĐŽŝůƚŽĐŽŶĨŝƌŵŝŶũĞĐƚŝǀŝƚLJŝŶƚŽĨŽƌŵĂƚŝŽŶ͘dĂƌŐĞƚƌĂƚĞŝƐĂŵŝŶŝŵƵŵŽĨϬ͘ϱďƉŵ͘ ϭϱ͘ DhĐĞŵĞŶƚŝŶŐ,͘ZhĂŶĚƚŝĞŝŶĐĞŵĞŶƚŝŶŐƵŶŝƚ͘Z/,ƚŽƚĂŐ/WĂŶĚWhƚŽцϭϬ͕ϵϭϱ͛ŵĚ͘ ϭϲ͘ DŝdžĂŶĚƉƵŵƉϭ͘ϳϱďďůƐ;ƉƵŵƉĂďůĞͿŽĨϭϱ͘ϴƉƉŐĐůĂƐƐ'ĐĞŵĞŶƚ͘ Ă͘ sŽůƵŵĞĂƐƐƵŵƉƚŝŽŶƐ͗ ŝ͘ ϯ͟ŽƉĞŶŚŽůĞdžϮͲϯͬϴ͟KůŝŶĞƌ͗Ϭ͘ϬϬϯϮϲďƉĨ ŝŝ͘ K,ǀŽůƵŵĞĨƌŽŵƉƵŶĐŚĞƐƚŽƐůŽƚƚĞĚůŝŶĞƌ͗ϭ͘ϯϱďďůƐ ŝŝŝ͘ ^ĞĞůŽŐƐĞĐƚŝŽŶďĞůŽǁƚŽƐĞĞ/W͕ůŝŶĞƌƉƵŶĐŚĞƐĂŶĚƐůŽƚƚĞĚůŝŶĞƌƚŽƐĞĞĂdsƉůŽƚ ŽĨĂůůŝŶƌĞůĂƚŝŽŶƐŚŝƉƚŽĞĂĐŚŽƚŚĞƌ͘ ϭϳ͘ ŝƌĐƵůĂƚĞϮďďůƐŽĨĐĞŵĞŶƚĚŽǁŶƚŚĞĐŽŝůǁŚŝůĞƚĂŬŝŶŐƌĞƚƵƌŶƐĨƌŽŵƚŚĞddždďŐĂŶŶƵůƵƐ͘ƚцϭ͘ϳϱďďůƐ ďĞĨŽƌĞĐĞŵĞŶƚĞdžŝƚƐd͕ďůŽĐŬŝŶĂŶĚďĞŐŝŶŝŶũĞĐƚŝŶŐƚŽĨŽƌŵĂƚŝŽŶ͘ ϭϴ͘ WůĂĐĞϭ͘ϱďďůƐŽĨĐĞŵĞŶƚŽƵƚƐŝĚĞƚŚĞůŝŶĞƌĂŶĚůĂLJŝŶƚŚĞƌĞŵĂŝŶŝŶŐϬ͘ϮϱďďůƐŝŶƚŚĞůŝŶĞƌ͘ ϭϵ͘ Wh,ƚŽƐĂĨĞƚLJĂŶĚĐŝƌĐƵůĂƚĞĐŽŝůĐůĞĂŶ͘ Ă͘ ,ŽůĚďĂĐŬƉƌĞƐƐƵƌĞŽŶǁĞůůǁŚŝůĞĐŝƌĐƵůĂƚŝŶŐƚŽƉƌĞǀĞŶƚǁĞůůĨ ƌŽŵĨůŽǁŝŶŐ͘ ď͘ WKK,ĂŶĚtK͘ŽŶĨŝƌŵĐĞŵĞŶƚĐƵƌĞƚŝŵĞǁŝƚŚĐĞŵĞŶƚŝŶŐĐŽŵƉĂŶLJ͘ ƉƵŶĐŚƚƵďŝŶŐĨƌŽŵцϭϬ͕ϵϮϬ͛ͲϭϬ͕ϵϮϱ͛ŵĚ͘ d&KΘŵƚ^Ƌnj tĞůů͗DWh>ͲϬϲ ĂƚĞ͗ϬϯͬϬϵͬϮϬϮϮ ϮϬ͘ Z/,ǁͬцϭ͘ϴϬKŵŝůůĂŶĚϭͲϭϭͬϭϲ͟ŵŽƚŽƌ͘Z/,ĂŶĚĚƌLJƚĂŐƚŚĞ dK͘ĞŐŝŶŵŝůůŝŶŐĐĞŵĞŶƚĂŶĚ/W͘ WƵƐŚĂůůƚŽWd͘ Ϯϭ͘ WKK,ĂŶĚĨƌĞĞnjĞƉƌŽƚĞĐƚǁĞůůŽŶǁĂLJŽƵƚŽĨŚŽůĞ͘ ϮϮ͘ ZdƵŶŝƚ͘ ^ůŝĐŬůŝŶĞ͗ Ϯϯ͘ Zh^>ƵŶŝƚĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚWƚŽϮϱϬƉƐŝͬϮ͕ϱϬϬƉƐŝŚŝŐŚ͘ Ϯϰ͘ ^ŚŝĨƚ^^ĐůŽƐĞĚĂƚϭϬ͕Ϯϴϴ͛ŵĚ͘ Ϯϱ͘ ^Ğƚϯ͘ϴϭϯ͟ϭϮ:WŝŶ^^ĂƚϭϬ͕Ϯϴϴ͛ŵĚ͘ Ϯϲ͘ Z^>hŶŝƚ͘ ƚƚĂĐŚŵĞŶƚƐ͗ ϭ͘ ^ĐŚĞŵĂƚŝĐ Ϯ͘ WƌŽƉŽƐĞĚ^ĐŚĞŵĂƚŝĐ ϯ͘ DWh>ͲϬϲ>ŽŐ^ĞĐƚŝŽŶ ϰ͘ ^ŝĚĞƚƌĂĐŬtŝŶĚŽǁƌĂǁŝŶŐ d&KΘŵƚ^Ƌnj tĞůů͗DWh>ͲϬϲ ĂƚĞ͗ϬϯͬϬϵͬϮϬϮϮ d&KΘŵƚ^Ƌnj tĞůů͗DWh>ͲϬϲ ĂƚĞ͗ϬϯͬϬϵͬϮϬϮϮ d&KΘŵƚ^Ƌnj tĞůů͗DWh>ͲϬϲ ĂƚĞ͗ϬϯͬϬϵͬϮϬϮϮ DWh>ͲϬϲ>ŽŐ^ĞĐƚŝŽŶ d&KΘŵƚ^Ƌnj tĞůů͗DWh>ͲϬϲ ĂƚĞ͗ϬϯͬϬϵͬϮϬϮϮ >ͲϬϲ^ŝĚĞƚƌĂĐŬtŝŶĚŽǁƌĂǁŝŶŐ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB ZĞǀŝƐĞĚLJ͗d&ϯͬϭϬͬϮϬϮϮ ^,Dd/ DŝůŶĞWŽŝŶƚhŶŝƚ tĞůů͗DWh>ͲϬϲ >ĂƐƚŽŵƉůĞƚĞĚ͗ϮͬϭϵͬϮϬϮϭ Wd͗ϮϮϭͲϬϭϭ ^/E'd/> ^ŝnjĞ dLJƉĞ tƚͬ'ƌĂĚĞͬŽŶŶ / dŽƉ ƚŵ W& ϭϯͲϯͬϴΗ ŽŶĚƵĐƚŽƌ ϰϴηͬ,ͲϰϬͬtĞůĚ ϭϮ͘ϳϭϱ ^ƵƌĨĂĐĞ ϭϭϱΖ Ϭ͘ϭϱϳ ϵͲϱͬϴΗ ^ƵƌĨĂĐĞ ϯϲηͬ:Ͳϱϱͬd ϴ͘ϵϮϭ ^ƵƌĨĂĐĞ ϲ͕ϯϭϰ͛ Ϭ͘Ϭϳϳϯ ϳΗ WƌŽĚƵĐƚŝŽŶ Ϯϲηͬ>ͲϴϬͬd ϲ͘Ϯϳϲ ^ƵƌĨĂĐĞ ϭϬ͕ϱϲϰ͛ Ϭ͘Ϭϯϴϯ ϯͲϭͬϰ͟ ^ŽůŝĚ>ŝŶĞƌ ϲ͘ϲηͬ>ͲϴϬͬd// Ϯ͘ϴϱϬ ϭϬ͕ϰϯϬ͛ ϭϬ͕ϳϳϱ͛ ϮͲϯͬϴ͟ ^ŽůŝĚͬ^ůŽƚƚĞĚ>ŝŶĞƌ ϰ͘ϳηͬ>ͲϴϬͬ,LJĚϱϭϭ ϭ͘ϵϵϱ ϭϬ͕ϰϮϱ͛ ϭϮ͕ϰϵϮ͛ dh/E'd/> ϰͲϭͬϮ͟ dƵďŝŶŐ ϭϮ͘ϲηͬ>ͲϴϬͬdyWd ϯ͘ϵϮ ^ƵƌĨĂĐĞ ϭϬ͕ϰϳϮ͛ Ϭ͘ϬϭϱϮ :t>Zzd/> EŽ ĞƉƚŚ /ƚĞŵ ϭ ϯϭ͛ ϰͲϭͬϮ͟dƵďŝŶŐ,ĂŶŐĞƌ Ϯ ϭϬ͕ϮϴϬ͛ 'ĂƵŐĞĂƌƌŝĞƌ ϯ ϭϬ͕Ϯϴϴ͛ ,^yͲůŝŶĞ^ůŝĚŝŶŐ^ůĞĞǀĞ͕ϯ͘ϴϭϯ͟^ĞĂůŽƌĞ/ ϰ ϭϬ͕Ϯϵϲ͛ WŽƌƚĞĚWƌĞƐƐƵƌĞ^Ƶď ϱ ϭϬ͕ϯϱϲ͛ ϳ͟džϰͲϭͬϮ͟WƌĞŵŝĞƌWƌŽĚƵĐƚŝŽŶWĂĐŬĞƌ ϲ ϭϬ͕ϰϮϱ͛ yEŝƉƉůĞ͕ϯ͘ϴϭϯ͟ ϳ ϭϬ͕ϰϯϰ͛ t>'͕ďŽƚƚŽŵĂƚϭϬ͕ϰϳϮ͛ ϴ ϭϬ͕ϱϲϰ͛ ϭ ƐƚtŚŝƉƐƚŽĐŬ ϵ ϭϬ͕ϳϳϱ͛ Ϯ ŶĚtŚŝƉƐƚŽĐŬ KWE,K>ͬDEdd/> ϯϬΗ ϰϴϱƐŬƐWĞƌŵĂĨƌŽƐƚ͚͛ ϭϮͲϭͬϰΗ ϭϰϲϵƐdžWĞƌŵĂĨƌŽƐƚ͚͕͛ϰϭϬƐdžůĂƐƐ͚'͛ ϴͲϭͬϮ͟ ϯϮϴƐdžůĂƐƐ͚'͛ ϰͲϭͬϭϲ͟ hŶĐĞŵĞŶƚĞĚ^ŽůŝĚ>ŝŶĞƌ ϯ͟ hŶĐĞŵĞŶƚĞĚ^ŽůŝĚͬ^ůŽƚƚĞĚ>ŝŶĞƌ t>>/E>/Ed/KEd/> <KWΛϳϬϬ͛ DĂdž,ŽůĞŶŐůĞсϭϬϬΣΛϭϭ͕ϯϵϬ͛ dŽƉŽĨtŝŶĚŽǁΛϭϬ͕ϱϲϰ͛ dZΘt>>, dƌĞĞ ϰͲϭͬϭϲ͟ϱ</t;ĚƌLJŚŽůĞͿ tĞůůŚĞĂĚ &DϭϭΗdžϰͲϭͬϮΗ,ĂŶŐĞƌ͕ϰ͘ϱΗd//ƚŽƉͬďƚŵǁͬϮͲϯͬϴΖΖƉŽƌƚƐ dсϭϮ͕ϲϳϭ͛;DͿͬdсϳ͕ϭϳϰ͛;dsͿ +DOOLEXUWRQ+26 &HPHQWHUDW ¶ KƌŝŐ͘<ůĞǀ͘сϱϲ͘Ϭ͛'ƌŽƵŶĚůĞǀ͘сϮϭ͘Ϭ͛ Z<Ͳd,&͗Ϯϯ͘ϵϱ͛;ŽLJŽŶϭϲͿ     &HPHQW 5HWDLQHU #¶´ 2+WR7' (VW72&DW¶ ϵͲϱͬϴ͟ 7RSRI´ /LQHU# ¶ (VW72&DW¶  WdсϭϮ͕ϱϬϱ͛;DͿͬWdсϳ͕ϭϲϲ͛;dsͿ ´;2´ #¶´ #¶  5$7DJDW ¶ $UFWLF3DFN %DNHU)ORZ *XDUG/LQHU 7RS3DFNHU ¶ 7RS RI :LQGRZ #¶ )DLOHG :KLSVWRFN #¶ 7RSRI´ /LQHU# ¶    3% #¶ ´2+ 7RSRI:LQGRZ #¶ :LQGRZ #¶ 3% #¶ ´2+ 3%%LOOHW #¶ ´ #¶ 3% #¶ ´2+ 3% %LOOHW #¶ C W>h'<d/> Wϭ͗ϭϬ͕ϳϭϬ͛Dʹϭϭ͕ϰϰϬ͛DʹŝůůĞƚƐĞƚΛϭϬ͕ϳϭϬ͛ʹϰͲϭͬϭϲ͟K, WϮ͗ϭϬ͕ϳϳϱ͛Dʹϭϭ͕ϴϴϲ͛DʹtŚŝƉƐƚŽĐŬƐĞƚΛϭϬ͕ϳϳϱ͛ʹϯͲϭͬϰ͟džϮͲϳͬϴ͟ůŝŶĞƌƚŽϭϬ͕ϵϴϮ͕͛ϰͲϭͬϭϲ͟K, Wϯ͗ϭϭ͕ϱϯϱ͛DʹϭϮ͕ϭϯϯ͛DʹŝůůĞƚƐĞƚΛϭϭ͕ϱϯϱ͛ʹϯ͟K, ^>Kdd>/EZd/> <hW^ĂŶĚƐ dŽƉ;DͿ ƚŵ;DͿ dŽƉ;dsͿ ƚŵ;dsͿ &d ĂƚĞ ^ƚĂƚƵƐ <ƵƉϮͬϯ ϭϭ͕ϯϰϬ͛ ϭϮ͕ϮϭϮ͛ ϳ͕ϬϵϮ͛ ϳ͕ϭϮϱ͛ ϴϳϮ͛ ϭͬϭϴͬϮϬϮϮ KƉĞŶ <ƵƉϮ ϭϮ͕ϯϬϰ͛ ϭϮ͕ϰϵϮ͛ ϳ͕ϭϰϭ͛ ϳ͕ϭϲϱ͛ ϭϴϴ͛ ϭͬϭϴͬϮϬϮϮ KƉĞŶ 'EZ>t>>/E&K W/͗ϱϬͲϬϮϵͲϮϮϬϬϯͲϬϭͲϬϬ ƌŝůůĞĚĂŶĚŽŵƉůĞƚĞĚďLJWŽŽůZŝŐϭϬϮͲϭϭͬϮϳͬϭϵϵϬ WƵůů^W͕ƐĞƚ/W͕ZƵŶ<ŝůůƐƚƌŝŶŐďLJŽLJŽŶϭϲͲϱͬϮϭͬϮϬϭϮ ZtKdƵďŝŶŐ^ǁĂƉ͗ϮͬϭϵͬϮϬϮϭ ^ŝĚĞƚƌĂĐŬŽŵƉůĞƚĞĚ͗ϭͬϮϬͬϮϬϮϮ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB ZĞǀŝƐĞĚLJ͗d&ϯͬϭϬͬϮϬϮϮ WZKWK^ DŝůŶĞWŽŝŶƚhŶŝƚ tĞůů͗DWh>ͲϬϲ >ĂƐƚŽŵƉůĞƚĞĚ͗ϮͬϭϵͬϮϬϮϭ Wd͗ϮϮϭͲϬϭϭ ^/E'd/> ^ŝnjĞ dLJƉĞ tƚͬ'ƌĂĚĞͬŽŶŶ / dŽƉ ƚŵ W& ϭϯͲϯͬϴΗ ŽŶĚƵĐƚŽƌ ϰϴηͬ,ͲϰϬͬtĞůĚ ϭϮ͘ϳϭϱ ^ƵƌĨĂĐĞ ϭϭϱΖ Ϭ͘ϭϱϳ ϵͲϱͬϴΗ ^ƵƌĨĂĐĞ ϯϲηͬ:Ͳϱϱͬd ϴ͘ϵϮϭ ^ƵƌĨĂĐĞ ϲ͕ϯϭϰ͛ Ϭ͘Ϭϳϳϯ ϳΗ WƌŽĚƵĐƚŝŽŶ Ϯϲηͬ>ͲϴϬͬd ϲ͘Ϯϳϲ ^ƵƌĨĂĐĞ ϭϬ͕ϱϲϰ͛ Ϭ͘Ϭϯϴϯ ϯͲϭͬϰ͟ ^ŽůŝĚ>ŝŶĞƌ ϲ͘ϲηͬ>ͲϴϬͬd// Ϯ͘ϴϱϬ ϭϬ͕ϰϯϬ͛ ϭϬ͕ϳϳϱ͛ ϮͲϯͬϴ͟ ^ŽůŝĚͬ^ůŽƚƚĞĚ>ŝŶĞƌ ϰ͘ϳηͬ>ͲϴϬͬ,LJĚϱϭϭ ϭ͘ϵϵϱ ϭϬ͕ϰϮϱ͛ ϭϮ͕ϰϵϮ͛ dh/E'd/> ϰͲϭͬϮ͟ dƵďŝŶŐ ϭϮ͘ϲηͬ>ͲϴϬͬdyWd ϯ͘ϵϮ ^ƵƌĨĂĐĞ ϭϬ͕ϰϳϮ͛ Ϭ͘ϬϭϱϮ :t>Zzd/> EŽ ĞƉƚŚ /ƚĞŵ ϭ ϯϭ͛ ϰͲϭͬϮ͟dƵďŝŶŐ,ĂŶŐĞƌ Ϯ ϭϬ͕ϮϴϬ͛ 'ĂƵŐĞĂƌƌŝĞƌ ϯ ϭϬ͕Ϯϴϴ͛ ,^yͲůŝŶĞ^ůŝĚŝŶŐ^ůĞĞǀĞ͕ϯ͘ϴϭϯ͟^ĞĂůŽƌĞ/ ϰ ϭϬ͕Ϯϵϲ͛ WŽƌƚĞĚWƌĞƐƐƵƌĞ^Ƶď ϱ ϭϬ͕ϯϱϲ͛ ϳ͟džϰͲϭͬϮ͟WƌĞŵŝĞƌWƌŽĚƵĐƚŝŽŶWĂĐŬĞƌ ϲ ϭϬ͕ϰϮϱ͛ yEŝƉƉůĞ͕ϯ͘ϴϭϯ͟ ϳ ϭϬ͕ϰϯϰ͛ t>'͕ďŽƚƚŽŵĂƚϭϬ͕ϰϳϮ͛ ϴ ϭϬ͕ϱϲϰ͛ ϭ ƐƚtŚŝƉƐƚŽĐŬ ϵ ϭϬ͕ϳϳϱ͛ Ϯ ŶĚtŚŝƉƐƚŽĐŬ KWE,K>ͬDEdd/> ϯϬΗ ϰϴϱƐŬƐWĞƌŵĂĨƌŽƐƚ͚͛ ϭϮͲϭͬϰΗ ϭϰϲϵƐdžWĞƌŵĂĨƌŽƐƚ͚͕͛ϰϭϬƐdžůĂƐƐ͚'͛ ϴͲϭͬϮ͟ ϯϮϴƐdžůĂƐƐ͚'͛ ϰͲϭͬϭϲ͟ hŶĐĞŵĞŶƚĞĚ^ŽůŝĚ>ŝŶĞƌ ϯ͟ hŶĐĞŵĞŶƚĞĚ^ŽůŝĚͬ^ůŽƚƚĞĚ>ŝŶĞƌ t>>/E>/Ed/KEd/> <KWΛϳϬϬ͛ DĂdž,ŽůĞŶŐůĞсϭϬϬΣΛϭϭ͕ϯϵϬ͛ dŽƉŽĨtŝŶĚŽǁΛϭϬ͕ϱϲϰ͛ dZΘt>>, dƌĞĞ ϰͲϭͬϭϲ͟ϱ</t;ĚƌLJŚŽůĞͿ tĞůůŚĞĂĚ &DϭϭΗdžϰͲϭͬϮΗ,ĂŶŐĞƌ͕ϰ͘ϱΗd//ƚŽƉͬďƚŵǁͬϮͲϯͬϴΖΖƉŽƌƚƐ dсϭϮ͕ϲϳϭ͛;DͿͬdсϳ͕ϭϳϰ͛;dsͿ +DOOLEXUWRQ+26 &HPHQWHUDW ¶ KƌŝŐ͘<ůĞǀ͘сϱϲ͘Ϭ͛'ƌŽƵŶĚůĞǀ͘сϮϭ͘Ϭ͛ Z<Ͳd,&͗Ϯϯ͘ϵϱ͛;ŽLJŽŶϭϲͿ     &HPHQW 5HWDLQHU #¶´ 2+WR7' (VW72& DW ¶ ϵͲϱͬϴ͟ 7RSRI´ /LQHU# ¶ (VW72&DW¶  WdсϭϮ͕ϱϬϱ͛;DͿͬWdсϳ͕ϭϲϲ͛;dsͿ ´;2´ #¶´ #¶  5$7DJDW ¶ $UFWLF3DFN %DNHU)ORZ *XDUG/LQHU 7RS3DFNHU ¶ 7RS RI :LQGRZ #¶ )DLOHG :KLSVWRFN #¶ 7RSRI´ /LQHU# ¶    3% #¶ ´2+ 7RSRI:LQGRZ #¶ :LQGRZ #¶ 3% #¶ ´2+ 3%%LOOHW #¶ ´ #¶ 3% #¶ ´2+ 3% %LOOHW #¶ 3URSRVHG 7XELQJ3XQFK DQG&HPHQW 6TXHH]H C W>h'<d/> Wϭ͗ϭϬ͕ϳϭϬ͛Dʹϭϭ͕ϰϰϬ͛DʹŝůůĞƚƐĞƚΛϭϬ͕ϳϭϬ͛ʹϰͲϭͬϭϲ͟K, WϮ͗ϭϬ͕ϳϳϱ͛Dʹϭϭ͕ϴϴϲ͛DʹtŚŝƉƐƚŽĐŬƐĞƚΛϭϬ͕ϳϳϱ͛ʹϯͲϭͬϰ͟džϮͲϳͬϴ͟ůŝŶĞƌƚŽϭϬ͕ϵϴϮ͕͛ϰͲϭͬϭϲ͟K, Wϯ͗ϭϭ͕ϱϯϱ͛DʹϭϮ͕ϭϯϯ͛DʹŝůůĞƚƐĞƚΛϭϭ͕ϱϯϱ͛ʹϯ͟K, ^>Kdd>/EZd/> <hW^ĂŶĚƐ dŽƉ;DͿ ƚŵ;DͿ dŽƉ;dsͿ ƚŵ;dsͿ &d ĂƚĞ ^ƚĂƚƵƐ <ƵƉϮͬϯ ϭϭ͕ϯϰϬ͛ ϭϮ͕ϮϭϮ͛ ϳ͕ϬϵϮ͛ ϳ͕ϭϮϱ͛ ϴϳϮ͛ ϭͬϭϴͬϮϬϮϮ KƉĞŶ <ƵƉϮ ϭϮ͕ϯϬϰ͛ ϭϮ͕ϰϵϮ͛ ϳ͕ϭϰϭ͛ ϳ͕ϭϲϱ͛ ϭϴϴ͛ ϭͬϭϴͬϮϬϮϮ KƉĞŶ 'EZ>t>>/E&K W/͗ϱϬͲϬϮϵͲϮϮϬϬϯͲϬϭͲϬϬ ƌŝůůĞĚĂŶĚŽŵƉůĞƚĞĚďLJWŽŽůZŝŐϭϬϮͲϭϭͬϮϳͬϭϵϵϬ WƵůů^W͕ƐĞƚ/W͕ZƵŶ<ŝůůƐƚƌŝŶŐďLJŽLJŽŶϭϲͲϱͬϮϭͬϮϬϭϮ ZtKdƵďŝŶŐ^ǁĂƉ͗ϮͬϭϵͬϮϬϮϭ ^ŝĚĞƚƌĂĐŬŽŵƉůĞƚĞĚ͗ϭͬϮϬͬϮϬϮϮ d&KΘŵƚ^Ƌnj tĞůů͗DWh>ͲϬϲ ĂƚĞ͗ϬϯͬϬϴͬϮϬϮϮ DWh>ͲϬϲ>ŽŐ^ĞĐƚŝŽŶ d&KΘŵƚ^Ƌnj tĞůů͗DWh>ͲϬϲ ĂƚĞ͗ϬϯͬϬϴͬϮϬϮϮ >ͲϬϲ^ŝĚĞƚƌĂĐŬtŝŶĚŽǁƌĂǁŝŶŐ David Douglas Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or fax to 907 564-4422. Received By: Date: Date: 02/15/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL WELL: MPU L-06APB3 PTD: 221-011 API: 50-029-22003-72-00 FINAL LWD FORMATION EVALUATION LOGS (01/11/2022 to 01/14/2022) x Multiple Propagation Resistivity & Gamma Ray (2” & 5” MD/TVD Color Logs) x Final Definitive Directional Surveys SFTP Transfer - Data Folders: Please include current contact information if different from above. 37' (6HW Received By: 02/15/2022 By Abby Bell at 2:46 pm, Feb 15, 2022 David Douglas Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or fax to 907 564-4422. Received By: Date: Date: 02/15/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL WELL: MPU L-06APB2 PTD: 221-011 API: 50-029-22003-71-00 FINAL LWD FORMATION EVALUATION LOGS (05/23/2021 to 06/08/2021) **** REDISTRIBUTION CHANGE NOTICE**** Previously distributed on 06/29/2021 as: MPU L-06A and API: 50-029-22003-01-00 Redistributed on 02/11/2022 as: MPU L-06APB2 and API: 50-029-22003-71-00 x Multiple Propagation Resistivity & Gamma Ray (2” & 5” MD/TVD Color Logs) x Final Definitive Directional Surveys SFTP Transfer - Data Folders: Please include current contact information if different from above. 37' (6HW Received By: 02/15/2022 By Abby Bell at 2:46 pm, Feb 15, 2022 David Douglas Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or fax to 907 564-4422. Received By: Date: Date: 02/15/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL WELL: MPU L-06A PTD: 221-011 API: 50-029-22003-01-00 FINAL LWD FORMATION EVALUATION LOGS (05/23/2021 to 01/17/2022) **** DISTRIBUTION CHANGE NOTICE**** Previous Log Package (submitted 06/29/2021) with the same well name and API is being replaced. This Log Package supersedes the 2021 submission. x Multiple Propagation Resistivity & Gamma Ray (2” & 5” MD/TVD Color Logs) x Final Definitive Directional Surveys SFTP Transfer - Data Folders: Please include current contact information if different from above. Received By: 02/17/2022 5HVXEPLWWDOIURP37' (6HW By Abby Bell at 1:52 pm, Feb 17, 2022 David Douglas Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or fax to 907 564-4422. Received By: Date: Date: 02/15/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL WELL: MPU L-06A PTD: 221-011 API: 50-029-22003-01-00 FINAL LWD FORMATION EVALUATION LOGS (01/11/2022 to 01/17/2022) **** DISTRIBUTION CHANGE NOTICE**** Previous Log Package (submitted 06/29/2021) with the same well name and API is being replaced. This Log Package supersedes the 2021 submission. x Multiple Propagation Resistivity & Gamma Ray (2” & 5” MD/TVD Color Logs) x Final Definitive Directional Surveys SFTP Transfer - Data Folders: Please include current contact information if different from above. 37' (6HW ceived By: 02/15/2022 By Abby Bell at 2:47 pm, Feb 15, 2022 P.I. SupvComm:Rig Coil Tubing Unit? yesRig Contractor Rig RepresentativeOperator Contractor RepresentativeWell Permit to Drill # 2210110 Sundry # 321-289Operation Inspection LocationWorking Pressure, W/H Flange P Pit Fluid Measurement P Working Pressure PP Flow Rate Sensor P Operating Pressure PP Mud Gas Separator P Fluid Level/Condition PP Degasser P Pressure Gauges PP Separator Bypass P Sufficient Valves PP Gas Detectors FP Regulator Bypass PP Alarms Separate/Distinct P Actuators (4-way valves) PP Choke/Kill Line Connections PBlind Ram Handle Cover PP Reserve Pits P Control Panel, Driller PP Trip Tank P Control Panel, Remote PPFirewallPPRIG FLOOR2 or More Pumps PP Kelly or TD Valves NA Independent Power Supply PP Floor Safety Valves P N2 Backup PP Driller's Console Condition of Equipment PP Flow Monitor PFlow Rate Indicator PPit Level Indicators P Valves PPPE P Gauges P Remote Hydraulic Choke PWell Control Trained P Gas Detection Monitor P FOV Upstream of Chokes PHousekeeping P Hydraulic Control Panel P Targeted Turns PWell Control Plan P Kill Sheet Current P Bypass Line PFAILURES:1CORRECT BY:COMMENTSLou Laubenstein1/9/2022During the Gas detection test, the H2S detector in the pits had to be recalibrated. Sundry 321-289 for June2021 operations shutdown.INSPECT DATEAOGCC INSPECTORNabors CDR2ACNaborsHilcorp Alaska LLCPipe RamsBlind RamsMedina / WilliamsIgtanloc / KavanaughLocking Devices, RamsBOP STACKCLOSING UNITMISCELLANEOUSFlange/Hub ConnectionsDrilling Spool OutletsFlow NippleControl LinesWorking Pressure, BOP StackStack AnchoredChoke LineKill LineTargeted TurnsCHOKE MANIFOLDMilne Point MUD SYSTEMMPU L-06ADrillingALASKA OIL AND GAS CONSERVATION COMMISSIONRIG INSPECTION REPORTHCR Valve(s)Manual ValvesAnnular Preventer2022-0109_Rig_Nabors_CDR2_MPU_L-06A_ll rev. 5-16-169999999-%5 STATE OF ALASKA Reviewed By: OIL AND GAS CONSERVATION COMMISSION P,I, Suprv'_'�'� BOPE Test Report for: MILNE PT UNIT L -06A Comm Contractor/Rig No.: Nabors CDR2AC PTD#: 2210110 - DATE: 1/9/2022 - Inspector Lou Laubenstein - Insp Source Operator: Hilcorp Alaska, LLC Operator Rep: Igtanloc/Kavanaugh Rig Rep: Medina/Williams Inspector Type Operation: DRILL Sundry No: Test Pressures: Inspection No: bopLOL220112065636 Rams: Annular: Valves: MASP: Type Test: UNIT 321-289Related Insp No: 250/5000 ' 250/3500 ' 250/5000 3333 ' TEST DATA MISC. INSPECTIONS: MUD SYSTEM: ACCUMULATOR SYSTEM: Upper Kelly __-- 0 ___-NA_ P/F Lower Kelly Visual Alarm Time/Pressure P/F Location Gen.: P Trip Tank P P System Pressure 3000----- P - Housekeeping: - P Pit Level Indicators P - P Pressure After Closure _ 2225 P PTD On Location P Flow Indicator P _ P 200 PSI Attained 18 P Standing Order Posted P Meth Gas Detector P FP Full Pressure Attained 48 P Well Sign P H2S Gas Detector P - P Blind Switch Covers: -- P Drl. Rig P MS Misc NA NA Nitgn. Bottles (avg): 10 (&, 1900 - P Hazard Sec. P - ACC Misc 0 NA Mise NA FLOOR SAFTY VALVES: BOP STACK: Quantity P/F Upper Kelly __-- 0 ___-NA_ Stripper Lower Kelly - 0 -'----NA-, -- P -_- _- Ball Type 2 -__ P I Inside BOP 0 NA - FSV Misc 0 _ - NA_ BOP STACK: Quantity Size P/F Stripper 1 - 2" -_ -- P -_- _- Annular Preventer 1 7 1/16" _ P #1 Rams 1 " Blind/Shear - P #2 Rams 1" 2' Slips P #3 Rams 1 2-3/8" Slams "_--P- _ #4 Rams 1 2" S_ lips_- P - #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 - 2-1/16" P HCR Valves 2 2-1/16" P Kill Line Valves 1 2-1/16" P Check Valve 0 NA BOP Misc 3 Slip blind flan FP CHOKE MANIFOLD: Quantity P/F No. Valves -12_ _ P Manual Chokes 1 P Hydraulic Chokes 1 P CH Misc 0 NA INSIDE REEL VALVES: (Valid for Coil Rigs Only) Quantity P/F Inside Reel Valves I P Number of Failures: 2 Test Results Test Time 8 Remarks: Test completed with 2" and 2-3/8" test joints, H2S monitor in the pits failed audible and was recalibrated. The slip blind that was between the tree and stack leaked mid test and was tightened. 61 14t �G21 David Douglas Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or fax to 907 564-4422. Received By: Date: Date: 06/29/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU L-06A + PB1 (PTD 221-011) FINAL LWD FORMATION EVALUATION LOGS (05/23/2021 to 06/08/2021) •Multiple Propagation Resistivity & Gamma Ray (2” & 5” MD/TVD Color Logs) •Final Definitive Directional Surveys SFTP Transfer - Well Folders: SFTP Transfer - Data Folders: Please include current contact information if different from above. 06/30/2021 PTD: 2210110 E-Set: 35301 David Douglas Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or fax to 907 564-4422. Received By: Date: Date: 06/29/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU L-06A + PB1 (PTD 221-011) FINAL LWD FORMATION EVALUATION LOGS (05/23/2021 to 06/08/2021) •Multiple Propagation Resistivity & Gamma Ray (2” & 5” MD/TVD Color Logs) •Final Definitive Directional Surveys SFTP Transfer - Well Folders: SFTP Transfer - Data Folders: Please include current contact information if different from above. 06/30/2021 PTD: 2210110 E-Set: 35302 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: 2.Operator Name:4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3.Address:Stratigraphic Service 6. API Number: 7. If perforating:8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception?Yes No 9.Property Designation (Lease Number):10.Field/Pool(s): 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD): 11,886'None Casing Collapse Conductor Surface 3,090 psi Intermediate 5,410 psi Liner Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13.Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14.Estimated Date for 15. Well Status after proposed work: Commencing Operations:OIL WINJ WDSPL Suspended 16.Verbal Approval:Date:GAS WAG GSTOR SPLUG Commission Representative: GINJ Op Shutdown Abandoned Sean McLaughlin Contact Name:Trevor Hyatt Sr. Drilling Engineer Contact Email:trevor.hyatt@hilcorp.com Contact Phone: 777-8396 Date: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Post Initial Injection MIT Req'd? Yes No Spacing Exception Required? Yes No Subsequent Form Required: APPROVED BY Approved by:COMMISSIONER THE COMMISSION Date: Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng 10,567'10,567'7,002' Authorized Signature: 6,314' June 11, 2021 4-1/2", 12.6# Perforation Depth MD (ft): None 7" Perforation Depth TVD (ft): 4-1/2" Premier Production Packer 10,356' / 6,881' Tubing MD (ft): 13-3/8" 9-5/8" 115' 6,314'5,750 psi 115' 4,590' 115' 3,333 None C.O. 432D PRESENT WELL CONDITION SUMMARY MPU L-06A L-80 TVD Burst 10,472' 7,240 psi Tubing Size:Tubing Grade: Length Size 7,102'10,982'7,133' MD STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL 025509 & 047434 221-011 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 Milne Point Field / Kuparuk Oil Pool 50-029-22003-01-00 Hilcorp Alaska LLC COMMISSION USE ONLY Authorized Name: Mel Rixse June 11, 2021 Authorized Title: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. 552'3-1/4" x 2-7/8" 10,430' - 10,982'6,930' - 7,133' mmary Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval. By Samantha Carlisle at 11:10 am, Jun 11, 2021 321-289 Digitally signed by Sean McLaughlin (4311) DN: cn=Sean McLaughlin (4311), ou=Users Date: 2021.06.11 10:41:53 -08'00' Sean McLaughlin (4311) 10-404 DSR-6/11/21MGR11JUN21DLB 06/14/2021 X  dts 6/14/2021 JLC 6/14/2021 Jeremy Price Digitally signed by Jeremy Price Date: 2021.06.14 14:19:20 -08'00' RBDMS HEW 6/16/2021 To: Alaska Oil & Gas Conservation Commission From: Trevor Hyatt Drilling Engineer Date: June 11, 2021 Re: MPU L-06A Sundry We are planning on stopping drilling operations (Operations Shutdown) for MPU L-06A (PTD #211-011) within the next 24-48 hours due to hole instability and lack of equipment to proceed further. Our plan is to re-access the target and re-plan completion within the next 6-8 months. MPU L-06A (PTD #221-011) Summary of events: 1. MIRU and test BOPE 2. Mill 3.80” single string window (out of 7”) plus 10’ of rathole. 3. Run caliper and discover whipstock fell, thus failed window. 4. Set second whipstock 5. Mill second window 3.80” single string window (out of 7”) plus 10’ of rathole. 6.Drill L-06A Build Section 7. Had fill and had to perform cleanout run 8. Drill L-06APB1 Lateral Section across fault to the south into the Kuparuk D shale a. Fault has larger throw than expected b. Determined that could not cross fault without crossing problematic shale MPU L-06A (PTD #211-011 Revised) Summary of events: 9. Obtained revised PTD to drill to a northern target 10. Set billet in build section 11. Drill L-06A with lateral BHA to the north 12. Crossed the fault from the A3 sand into the lower A1 shale a. Fault has larger throw than expected b. Drilled up into A1, A2 and A3 sands to TD 13. Unable to clean wellbore for running liner (B and A1 shales unstable) 14. No open hole anchored billets available, unable to open hole sidetrack wellbore MPU L-06A (PTD #211-011) Summary of Operations Shutdown: 15. Run 3-1/4” liner from 10,430’ MD (4-1/2” tubing) to 10,982’ MD (set down on collapsed Kuparuk B shale) 16. Swap to KCl and freeze protect. 17. RDMO 18. Develop plan to come back in future to sidetrack out of 3-1/4” liner and drill to northern target above B shale. _____________________________________________________________________________________ Revised By: JNL 6/10/2021 SCHEMATIC Milne Point Unit Well: MPU L-06A Last Completed: 2/19/2021 PTD: 211-011 GENERAL WELL INFO API: 50-029-22003-01-00 Drilled and Completed by Pool Rig 102 - 11/27/1990 Pull ESP, set CIBP, Run Killstring by Doyon 16 - 5/21/2012 RWO Tubing Swap: 2/19/2021 A Sidetrack: Operations Shutdown 6/10/2021 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8" Conductor 48# / H-40 / Weld 12.715 Surface 115' 0.157 9-5/8" Surface 36# / J-55 / BTC 8.921 Surface 6,314’ 0.0773 7" Production 26# / L-80 / BTC 6.276 Surface 10,567’ 0.0383 3-1/4” Solid Liner 6.6 # / L-80 / TCII 10,430’ 10,952’ 2-7/8” Solid Liner 6.5# / L-80 / ST-L 10,952’ 10,982’ TUBING DETAIL 4-1/2” Tubing 12.6# / L-80 / TXP BTC 3.92 Surface 10,472’ 0.0152 JEWELRY DETAIL No Depth Item 1 31’ 4-1/2” Tubing Hanger 2 10,280’ Gauge Carrier 3 10,288’ HES X-line Sliding Sleeve, 3.813” Seal Bore ID 4 10,296’ Ported Pressure Sub 5 10,356’ 7” x 4-1/2” Premier Production Packer 6 10,425’ X Nipple, 3.813” 7 10,434’ WELG, bottom at 10,472’ SLOTTED LINER DETAIL KUP Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kuparuk A OPEN HOLE / CEMENT DETAIL 30" 485 sks Permafrost “C” 12-1/4" 316 bbl Permafrost E, 67 bbl Class ‘G’ 8-1/2” 65 bbl Class “G” 4-1/16” Uncemented Solid Liner WELL INCLINATION DETAIL KOP @ 700’ Max Hole Angle = 100° @ 11,390’ A Top of Window @ 10,564’ TREE & WELLHEAD Tree 4-1/16” 5K CIW (dry hole) Wellhead FMC 11"x 4-1/2" Hanger, 4.5" TCII top/btm w/ 2- 3/8'' ports TD =11,886’ (MD) /TD =7,102’(TVD) Halliburton HOS Cementer at 1,881’ Orig. KB Elev. = 56.0’ Ground Elev. = 17.0’ RKB-THF: 23.95’ (Doyon 16) 3 5 7 Est. TOC at 8,820’ 9-5/8” Top of 3-1/4” Liner @ 10,430’ Est. TOC at 2,000’ 6 PBTD = 10,982’(MD) / PBTD=7,133’(TVD) Bottom of 2-7/8” Liner @10,982’ RA Tag at 10,304’ Arctic Pack Top of Window @10,564’ 4 3-1/4” x 2- 7/8 XO @ 10,952’ 2 1 ` TD 11,091' MD cement retainer ~10,590; MD Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Monty M Myers Drilling Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Milne Point Field, Kuparuk Oil Pool, MPU L-06A Hilcorp Alaska, LLC Permit to Drill Number: 221-011 revised Surface Location: 2119' FNL, 318' FWL, Sec. 08, T13N, R10E, UM, AK Bottomhole Location: 2007' FNL, 2540' FEL, Sec. 04, T13N, R10E, UM, AK Dear Mr. Myers: Enclosed is the approved application for the permit to drill the above referenced well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jeremy M. Price Chair DATED this ___ day of June, 2021.  Jeremy Price Digitally signed by Jeremy Price Date: 2021.06.07 16:39:08 -08'00' 1a. Type of Work: 1b. Proposed Well Class: Exploratory - Gas Service - WAG Service - Disp 1c. Specify if well is proposed for: Drill Lateral Stratigraphic Test Development - Oil Service - Winj Single Zone Coalbed Gas Gas Hydrates Redrill Reentry Exploratory - Oil Development - Gas Service - Supply Multiple Zone Geothermal Shale Gas 2.Operator Name: 5. Bond: Blanket Single Well 11.Well Name and Number: Bond No. 3. Address:6. Proposed Depth:12. Field/Pool(s): MD: 12,800' TVD: 7,200' 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: Top of Productive Horizon:8.DNR Approval Number:13.Approximate Spud Date: Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10.KB Elevation above MSL (ft): 56.0'15.Distance to Nearest Well Open Surface: x-544920 y- 6031351 Zone- 4 17.0' to Same Pool: 1,675' 16.Deviated wells: Kickoff depth: 10561 feet 17.Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: Surface: Hole Casing Weight Grade Coupling Length MD TVD MD TVD 4-1/4" 3-1/4" 6.6# L-80 TCII 970' 10,430' 6,869' 11,400' 7,100' 3" 2-3/8" 6.5# L-80 STL/Hyd511 2,380' 10,420' 6,863' 12,800' 7,200' 19.PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Junk (measured): 10,582' TVD 115' 4,590' 7,299' None None Hydraulic Fracture planned? Yes No 20. Attachments: Property Plat BOP Sketch Drilling Program Time v. Depth Plot Shallow Hazard Analysis Diverter Sketch Seabed Report Drilling Fluid Program 20 AAC 25.050 requirements Contact Name: Trevor Hyatt Monty Myers Contact Email:trevor.hyatt@hilcorp.com Drilling Manager Contact Phone:777-8396 Date: Permit to Drill API Number: Permit Approval Number:Date: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Samples req'd: Yes No Mud log req'd: Yes No H2S measures: Yes No Directional svy req'd: Yes No Spacing exception req'd: Yes No Inclination-only svy req'd: Yes No Post initial injection MIT req'd: Yes No APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng 50-029-22003-01-00 20 AAC 25.005 PERMIT TO DRILL REVISED: Change Bottom hole by over 500' June 4, 2021 10,612' 21. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Surface Perforation Depth TVD (ft): GL / BF Elevation above MSL (ft): Perforation Depth MD (ft): 6,314' 485 sx Permafrost 'C' 115' 6,314'9-5/8" 316 Bbls PF 'E', 67 Bbls Class 'G' Effect. Depth MD (ft): Effect. Depth TVD (ft): Authorized Title: Authorized Signature: 65 Bbls Class 'G'Production Liner 11,068' Intermediate Authorized Name: Conductor/Structural 13-3/8"80' 11,091'7,313' LengthCasing 10,561', 10600' Cement Volume MDSize Plugs (measured): (including stage data) Uncemented Solid Liner Uncemented Solid / Slotted Liner 10,561' 6,998' 5093 18.Casing Program: Top - Setting Depth - BottomSpecifications 4033 Total Depth MD (ft): Total Depth TVD (ft): 22224484 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 3033 2127' FSL, 926' FWL, Sec. 04, T13N, R10E, UM, AK 2007' FNL, 2540' FEL, Sec. 04, T13N, R10E, UM, AK 88-002 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 Hilcorp Alaska, LLC 2119' FNL, 318' FWL, Sec. 08, T13N, R10E, UM, AK ADL 025509 & 047434 MPU L-06A Milne Point Field Kuparuk Oil Pool Cement Quantity, c.f. or sacks Commission Use Only See cover letter for other requirements.221-011 (Revised) 11,068'7" kt oo oo oo oo oo oo Form 10-401 Revised 3/2021 This permit is valid for 24 months from the date of approval per 20 AAC 25.005(g) 6.3.2021 By Samantha Carlisle at 7:27 am, Jun 04, 2021 Digitally signed by Monty M Myers DN: cn=Monty M Myers, c=US, o=Hilcorp Alaska, LLC, ou=Technical Services - AK Drilling, email=mmyers@hilcorp.com Reason: I am approving this document Date: 2021.06.03 19:19:08 -08'00' Monty M Myers X X DSR-6/7/21MGR04JUN2021 1/27/21 Verbal given to Hilcorp on 06/04/2021 to proceed with revised plan by DLB. XBOPE test to 3500 psi. Annular to 3500 psi. X X X DLB X DLB 06/07/2021 3333  dts 6/7/2021 JLC 6/7/2021 Jeremy Price Digitally signed by Jeremy Price Date: 2021.06.07 16:38:40 -08'00' To: Alaska Oil & Gas Conservation Commission From: Trevor Hyatt Drilling Engineer Date: June 3, 2021 Re: MPU L-06A REVISED Permit to Drill Approval is requested for drilling a CTD sidetrack lateral from well MPU L-06 with the Nabors CDR2 Coiled Tubing Drilling rig on or around June 2021. Proposed plan for MPU L-06A Producer: Prior to drilling activities, the wellbore was prepped for a sidetrack (see L-06 Sundry request). The 2-7/8” kill string was pulled, cement milled, and a 4-1/2” production string ran. An E-line unit set a 4-1/2” x 7” CTD whipstock in the Kuparuk interval. Past Ops: The CDR2 rig has moved in, tested BOPE and killed the well. A single string window exit + 10’ of rathole was milled out of the 7”. This window failed (whipstock fell) and a second whipstock had to be set and window milled in the Kuparuk C sand. The lateral (L-06A) kicked off in the Kuparuk C, built through the B and landed in the A to cross a fault into the Kuparuk D to the south. We were not able to get back into existing lateral with the Kuparuk B shale collapsing in the build section. The fault crossing, to get to the original target to the south, has a larger throw than anticipated, meaning drilling Kuparuk D shale. This is not an option, and the team has devised a plan to drill to the north for a Kuparuk A sand target. Plan Forward: Set a billet in the build section (above the B shale) and kick off to the north. The lateral (L-06A) will kick off in the Kuparuk B silt, build through the B and land in the A to cross a fault into the Kuparuk A to the north. If determined necessary (problematic shales open), intermediate TD will be called once confirmed in the Kuparuk A sand and a 3-1/2” x 3-1/4” solid protection liner will be run. The rig will downsize from 2-3/8” to 2” coil and mill out the bottom shoe of the protection string. The well will then continue in the Kuparuk A to TD in this fault block to the north. The lateral will then be completed with 2-3/8" L-80 solid/slotted liner with a liner top inside the 4-1/2” tubing. If it is determined that problematic shale is not crossed at the fault crossing, the lateral will be drilled as originally planned bighole (2-3/8” coil) 4.06” - 4.25” hole and 3-1/4” x 2-7/8” solid/slotted liner ran. The following describes the work planned. A wellbore schematic of the current well and proposed sidetrack is attached for reference. Pre-Rig Work: 1. Reference MPU L-06 Sundry submitted in concert with this request 2.General work scope of Pre-Rig work: a.Rig: Pull kill string b.Rig: Mill cement and retainer to 10,600’ MD c. Rig: Run 4-1/2” production string d.E-line: Set 4-1/2” x 7” whipstock top at ~10,577’ MD, 25 deg ROHS Rig Work: Past Ops: 3.MIRU and test BOPE to 3500 psi. MASP with gas (0.10 psi/ft) to surface is 3333 psi a.Give AOGCC 24hr notice prior to BOPE test b.Test against swab and master valves (No TWC) c. Load pits with drilling fluid d.Open well and ensure zero pressure g Past Ops: 4. Mill 3.80” single string window (out of 7”) plus 10’ of rathole. a. Top of window (whipstock pinch point) at 10,582’ MD. b. Mill window with 0.6° bend motor c. Pressure deployment is required for the window milling run i.SBHPS 04/10/12 4,033 psi at 7,001’ TVD (11.1 ppg EMW) d.Hold 11.8 ppg MPD while milling window 5.Failed Window (whipstock fell) - Set second whipstock at 10,561’ MD, high side 6. Mill second window 3.80” single string window (out of 7”) plus 10’ of rathole. a. Top of planned window (whipstock pinch point) at 10,564’ MD, high side. b. Mill window with 0° bend motor c. Pressure deployment is required for the window milling run i. SBHPS 04/10/12 4,033 psi at 7,001’ TVD (11.1 ppg EMW) d.Hold 11.8 ppg MPD while milling window 7.Drill L-06A Build – Protection String Section a.3” BHA with GR/RES / Bi-center Bit (4.06” - 4.25”) b.40° DLS build section – TD 10,985’ MD c. 12° DLS lateral section – TD 11,406’ MD (past fault) d.Drill through Kuparuk C, B, A and land in A sand on other side of fault e.Drill with a constant bottom hole pressure for entire sidetrack f. Pressure deployment will be utilized g.After TD and on the last trip out of hole lay in completion/kill weight fluid in preparation for liner run h.No flow test prior to laying down drilling BHA ***Current well plan has been drilled to the south to the large fault and we are unable to get past the B shale (in the build section) in the original L-06A plan. Plan to set a billet above the B shale (in the build) and sidetrack to the north to following the plan below. *** Plan Forward: 8.Drill L-06A Build – Protection String Section a.3” BHA with GR/RES / Bi-center Bit (4.06” - 4.25”) b.12° DLS lateral section – 690’ MD / Billet at ~10,710’ MD and Planned TD 11,400’ MD (past fault) c. Drill through Kuparuk C, B, A and land in A sand on other side of fault d.Drill with a constant bottom hole pressure for entire sidetrack e. Pressure deployment will be utilized f. After TD and on the last trip out of hole lay in completion/kill weight fluid in preparation for liner run g.No flow test prior to laying down drilling BHA h. ***If determined no problematic shale crossed at fault, continue to L-06A TD (12,800’ MD) with bighole and don’t run protection string. Then go to step 15. 9.Run 3-1/4” L-80 solid liner (protection string) with bullnose shoe a.Top of liner left inside 4-1/2” tubing b.Have 2-3/8” safety joint with TIW valve ready to be picked up while running liner 10.Swap equipment and reel from 2-3/8” to 2” coil 11. Test BOPE 250 psi low and 3,500 psi high for rams / 3,500 psi high for annular (MASP of 3,333 psi) a.Provide 24-hour notice to AOGCC to witness b.Test against swab and master valves (No TWC) 12.Mill out 3-1/4” shoe with 2.74” Mill + 10’ of rathole 13.Drill – Lateral (L-06A) a. 2-3/8” BHA with GR/RES / Bi-center Bit (3”) b.12° DLS lateral section – 1,400’ MD / Planned TD 12,800’ MD c. Drill with a constant bottom hole pressure for entire sidetrack d.Pressure deployment will be utilized e.After TD and on the last trip out of hole lay in completion/kill weight fluid in preparation for liner run f.No flow test prior to laying down drilling BHA Plan Forward: 14. Run 2-3/8” L-80 solid/slotted liner (L-06A) a. Have 2-3/8” safety joint with TIW valve ready to be picked up while running liner b. Liner may be run in two sections if weight transfer or hole conditions is poor c. After releasing from the liner swap the well over to 2% KCl d.Freeze protect well from ~2200’ MD (min) e. RDMO 15.***If no problematic shale is crossed at fault continue with lateral on bighole as follows. 16. Run 2-7/8” L-80 solid/slotted liner (L-06A) a. Have 2-3/8” safety joint with TIW valve ready to be picked up while running liner b. Liner may be run in two sections if weight transfer or hole conditions is poor c. After releasing from the liner swap the well over to 2% KCl d. Freeze protect well from ~2200’ MD (min) e. RDMO Post Rig: 1.V: Tree work as necessary 2. S: Install LTP Managed Pressure Drilling: The history of CTD at KRU in the Kuparuk reservoir, has demonstrated the benefits of a managed pressure drilling technique. Due to uncertainties about the bottom hole pressures to be encountered as this sidetrack is drilled, managed pressure drilling techniques will be employed on this well. The intent is to provide constant bottom hole pressure by using minimum 8.7 ppg drilling fluid in combination with annular friction losses and applied surface pressure. Constant BHP will be utilized to reduce pressure fluctuations to help with hole stability. Applying annular friction and choke pressure also allow use of lighter drilling fluid and minimizes fluid losses and/or fracturing at the end of the long well bores. A MPD choke for regulating surface pressure is located between the WC choke manifold and the mud pits and will be independent of the WC choke. Deployment of the BHA under trapped wellhead pressure will be necessary. Pressure deployment of the BHA will be accomplished utilizing 3” (bighole) & 2-3/8” (slimhole) pipe/slip rams (see attached BOP configurations). The annular preventer will act as a secondary containment during deployment and not as a stripper. Operating parameters and fluid densities will be adjusted based on real-time bottom hole pressure measurements while drilling and shale behavior. The following scenario is expected for MPL-06A: x Latest reservoir pressure in the parent well: 4033 psi (11.1 ppg) MPD Pressure at the MPU L-06 Planned Window (10562’ MD - 7001’ TVD) Pumps On Pumps Off A Target BHP at Window (ppg)4,296 psi 4,296 psi 11.8 B Annular friction - ECD (psi/ft)634 psi 0 psi 0.06 (slimhole) C Mud Hydrostatic (ppg)3,167 psi 3,167 psi 8.7 B+C 3,801 psi 3,167 psi (no choke pressure) A-(B+C)Choke Pressure Required to Maintain 495 psi 1,129 psi Target BHP at window and deeper NOTE: MPD with CTD. DLB Operation Details: Reservoir Pressure: x The maximum reservoir pressure for L-06A is expected to be 4033 psi at 7001’ TVD (11.1 ppg equivalent). x Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 3333 psi. Mud Program: x Drilling: Minimum MW of 8.6 ppg KCL with Geovis for drilling. Managed pressure used to maintain constant BHP. x KWF will be stored on location. The tankage will contain 1.5 wellbore volumes of KWF (11.3 ppg expected) to exceed the maximum possible BHP to be encountered as the lateral is drilled. Adjust with real time BHP monitoring. x Completion: A minimum MW 11.3 ppg KWF to be used for liner deployment. Will target 11.8 ppg to match managed pressure target. Disposal: x All cuttings & mud generated during drilling operations will be hauled to the Milne Point “B” pad G&I facility. Hole Size: x 4.06” - 4.25” bicenter hole for build and lateral to cross fault (potential to drill both laterals with this size if no protection string is ran). x 3” bicenter hole after 3-1/4” protection string is ran across fault. Liner Program: Protection String and downsize to 2” coil (slimhole) scenario L-06A x 3-1/4” 6.6#, L-80 solid liner: 10,430’ MD – 11,400’ MD x 2-3/8”, 6.5#, L-80 solid/slotted liner: 10,420’ MD – 12,800’ MD No Protection String and stay on 2-3/8” coil (bighole) scenario L-06A x 3-1/4” 6.6#, L-80 solid liner: 10,430’ MD – 10,800’ MD x 2-7/8”, 6.5#, L-80 slotted liner: 10,800’ MD – 12,800’ MD x No Cement. A liner top packer will be run post rig to facilitate production from the new fault block. x The primary barrier for this operation: Kill Weight Fluid to provide overbalance as necessary x A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: x Two BOP diagrams are attached. MPD and pressure deployment is planned. x Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. x The annular preventer will be tested to 250 psi and 3,500 psi. x An X-over shall be made up to a 2-3/8” safety joint including a TIW valve for all tubulars ran in hole. x 1.5 wellbore volumes of KWF will be on location at all times during drilling operations. x Exemption request to 20 AAC 25.036 - Liner rams in the BOPE. A 2-3/8” safety joint will be utilized while running 2-3/8” slotted liner, 3-1/4” solid liner (protection string) or 2-7/8” solid/slotted liner (no protection string scenario). The desire is to keep the same standing orders for the entire liner run and not change shut in techniques (run safety joint with pre-installed TIW valve). When closing on a 2-3/8” safety joint 2 sets of rams will be available, above and below the flow cross providing better well control option. Directional: x Directional plan attached. Maximum planned hole angle is 90° x Inclination at kick off point is 56°. x Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. x Distance to nearest property line – 10,612’ x Distance to nearest well within pool – 1,675’ (C-17) Logging: x MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. x Real time bore pressure to aid in MPD and ECD management. Perforating: x No perforating, slotted liner. Anti-Collision Failures: x No failures for L-06A Hazards: x MPU L-pad is considered a high H2S pad. The highest recorded H2S well on the pad was from MPU L-32 (410 ppm) in 2009. The maximum recorded value on L-06 is 3 ppm (12/17/2009). Drilling L-06A into a new fault block has a low H2S risk. x Fault crossing. Potential to go from an 11.1 ppg EMW to 8.5 ppg EWM. Use mud viscosity to mitigate differential sticking and losses. x Medium lost circulation risk. Trevor Hyatt CC: Well File Drilling Engineer Joseph Lastufka 907-223-3087 NOTE DLB MPU L-pad is considered a high H2S pad. The highest recorded H2S well on the pad was from MPU L-32pgpg p (410 ppm) in 2009. The maximum recorded value on L-06 is 3 ppm (12/17/2009). D 6WDQGDUG3URSRVDO5HSRUW -XQH 3ODQ038/$ZS +LOFRUS$ODVND//& 0LOQH3RLQW 03W/3DG 03/ 038/$ 362537503875400041254250437545004625475048755000512552505375South(-)/North(+) (250 usft/in)5500 5625 5750 5875 6000 6125 6250 6375 6500 6625 6750 6875 7000 7125 7250 7375 7500 7625 7750 7875West(-)/East(+) (250 usft/in)7 0 0 0 7 1 3 1 M P U L -0 6 A P B 1 67507 2 5 0 7 3 1 9 M P L -0 62 7/8" x 3 1/4"7200M PU L-06A wp08KOP : Start Dir 18º/100' : 10710' MD, 7045.41'TVD : 0° RT TFStart Dir 11.99º/100' : 10730' MD, 7050.54'TVDStart Dir 12º/100' : 10760.68' MD, 7056.86'TVDStart Dir 12.01º/100' : 11800' MD, 7114.25'TVDStart Dir 12º/100' : 11850.79' MD, 7116.52'TVDStart Dir 11.13º/100' : 12440.68' MD, 7168.57'TVDStart Dir 11.47º/100' : 12590.68' MD, 7181.48'TVDTotal Depth : 12800' MD, 7199.62' TVDCASING DETAILSTVDTVDSS MDSize Name7199.62 7143.62 12800.00 2-7/8 2 7/8" x 3 1/4"Project: Milne PointSite: M Pt L PadWell: MPL-06Wellbore: MPU L-06APlan: MPU L-06A wp08WELL DETAILS: MPL-06Ground Level: 17.00+N/-S +E/-W Northing Easting Latittude Longitude0.00 0.006031350.91 544919.9770° 29' 47.468 N 149° 37' 57.645 WREFERENCE INFORMATIONCo-ordinate (N/E) Reference:Well MPL-06, True NorthVertical (TVD) Reference:MPL-06 Ref Elevation @ 56.00usftMeasured Depth Reference:MPL-06 Ref Elevation @ 56.00usftCalculation Method:Minimum Curvature 66006800700072007400True Vertical Depth (300 usft/in)6600 6800 7000 7200 7400 7600 7800 8000 8200 8400 8600 8800 9000 9200 9400Vertical Section at 54.92° (300 usft/in)105001 1 0 0 0 11390MPU L-06APB110000105001100011091MPL-062 7/8" x 3 1/4"1100011500120001250012800MPU L-06A wp08KOP : Start Dir 18º/100' : 10710' MD, 7045.41'TVD : 0° RT TFStart Dir 11.99º/100' : 10730' MD, 7050.54'TVDStart Dir 12º/100' : 10760.68' MD, 7056.86'TVDStart Dir 12.01º/100' : 11800' MD, 7114.25'TVDStart Dir 12º/100' : 11850.79' MD, 7116.52'TVDStart Dir 11.13º/100' : 12440.68' MD, 7168.57'TVDStart Dir 11.47º/100' : 12590.68' MD, 7181.48'TVDTotal Depth : 12800' MD, 7199.62' TVDWELL DETAILS: MPL-06 NAD 1927 (NADCON CONUS) Alaska Zone 04Ground Level:17.00+N/-S +E/-W Northing EastingLatittude Longitude0.00 0.00 6031350.91 544919.9770° 29' 47.468 N149° 37' 57.645 WCASING DETAILSTVD TVDSS MD Size Name7199.62 7143.62 12800.00 2-7/8 2 7/8" x 3 1/4"Project: Milne PointSite: M Pt L PadWell: MPL-06Wellbore: MPU L-06ADesign: MPU L-06A wp08SECTION DETAILSSec MD Inc Azi TVD +N/-S +E/-W Dleg TFace VSect Target Annotation1 10710.00 73.33 94.40 7045.41 4295.18 5997.41 0.00 0.00 7376.51 KOP : Start Dir 18º/100' : 10710' MD, 7045.41'TVD : 0° RT TF2 10730.00 76.93 94.40 7050.54 4293.70 6016.68 18.00 0.00 7391.43 Start Dir 11.99º/100' : 10730' MD, 7050.54'TVD3 10760.68 79.31 91.53 7056.86 4292.15 6046.66 11.99 -49.94 7415.07 Start Dir 12º/100' : 10760.68' MD, 7056.86'TVD4 10845.41 86.00 83.81 7067.70 4295.61 6130.51 12.00 -49.41 7485.675 11188.00 86.99 42.63 7089.59 4446.41 6429.17 12.00 -90.00 7816.756 11380.00 87.23 65.70 7099.40 4557.91 6583.57 12.00 90.00 8007.197 11590.00 87.49 40.47 7109.23 4682.90 6749.93 12.00 -90.01 8215.168 11700.00 88.70 27.32 7112.91 4773.95 6811.10 12.00 -84.98 8317.559 11800.00 89.77 39.27 7114.25 4857.38 6865.90 12.00 84.98 8410.34 Start Dir 12.01º/100' : 11800' MD, 7114.25'TVD10 11850.79 85.10 43.20 7116.52 4895.52 6899.32 12.01 140.02 8459.62 Start Dir 12º/100' : 11850.79' MD, 7116.52'TVD11 12150.79 85.10 79.33 7143.02 5036.81 7157.03 12.00 91.60 8751.7112 12440.68 85.10 44.42 7168.57 5170.84 7407.77 12.00 -91.54 9033.93 Start Dir 11.13º/100' : 12440.68' MD, 7168.57'TVD13 12590.68 85.10 61.17 7181.48 5260.88 7526.38 11.13 90.72 9182.74 Start Dir 11.47º/100' : 12590.68' MD, 7181.48'TVD14 12800.00 85.10 37.08 7199.62 5396.34 7682.90 11.47 -91.04 9388.68 Total Depth : 12800' MD, 7199.62' TVDSURVEY PROGRAMDate: 2021-06-03T00:00:00 Validated: Yes Version: Depth FromDepth To Survey/PlanTool100.00 10500.00 1 : Schlumberger GCT multishot (MPL-06) 3_Gyro-CT_pre-1998_Csg10562.00 10710.00 Survey #1 (MPU L-06APB1) 3_MWD10710.00 12800.00 MPU L-06A wp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ƒ6ORW5DGLXV    ƒ 1 ƒ : :HOO :HOO3RVLWLRQ /RQJLWXGH /DWLWXGH (DVWLQJ 1RUWKLQJ XVIW (: 16 3RVLWLRQ8QFHUWDLQW\ XVIW XVIW XVIW*URXQG/HYHO 03/03/ XVIW XVIW     :HOOKHDG(OHYDWLRQXVIW ƒ 1 ƒ : :HOOERUH 'HFOLQDWLRQ ƒ )LHOG6WUHQJWK Q7 6DPSOH'DWH 'LS$QJOH ƒ 038/$ 0RGHO1DPH0DJQHWLFV %**0     3KDVH9HUVLRQ $XGLW1RWHV 'HVLJQ 038/$ZS 3/$1 9HUWLFDO6HFWLRQ 'HSWK)URP 79' XVIW 16 XVIW 'LUHFWLRQ ƒ (: XVIW 7LH2Q'HSWK  ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 7RRO)DFH ƒ 16 XVIW 0HDVXUHG 'HSWK XVIW 9HUWLFDO 'HSWK XVIW 'RJOHJ 5DWH ƒXVIW %XLOG 5DWH ƒXVIW 7XUQ 5DWH ƒXVIW 3ODQ6HFWLRQV 79' 6\VWHP XVIW               30 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W/3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03/ 038/$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 03/5HI(OHYDWLRQ#XVIW 'HVLJQ038/$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH03/5HI(OHYDWLRQ#XVIW 1RUWK5HIHUHQFH :HOO03/ 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                                                                                                                                                                           30 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W/3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03/ 038/$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 03/5HI(OHYDWLRQ#XVIW 'HVLJQ038/$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH03/5HI(OHYDWLRQ#XVIW 1RUWK5HIHUHQFH :HOO03/ 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                                                                                                                                                                30 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W/3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03/ 038/$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 03/5HI(OHYDWLRQ#XVIW 'HVLJQ038/$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH03/5HI(OHYDWLRQ#XVIW 1RUWK5HIHUHQFH :HOO03/ 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                                              .236WDUW'LUž  0' 79'ƒ577)               6WDUW'LUž  0' 79'               6WDUW'LUž  0' 79'                                                                              30 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W/3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03/ 038/$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 03/5HI(OHYDWLRQ#XVIW 'HVLJQ038/$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH03/5HI(OHYDWLRQ#XVIW 1RUWK5HIHUHQFH :HOO03/ 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                                                                                                      6WDUW'LUž  0' 79'               6WDUW'LUž  0' 79'                                           30 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W/3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03/ 038/$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 03/5HI(OHYDWLRQ#XVIW 'HVLJQ038/$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH03/5HI(OHYDWLRQ#XVIW 1RUWK5HIHUHQFH :HOO03/ 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                               6WDUW'LUž  0' 79'                             6WDUW'LUž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ž  0' 79'ƒ577)     6WDUW'LUž  0' 79'     6WDUW'LUž  0' 79'     6WDUW'LUž  0' 79'     6WDUW'LUž  0' 79'     6WDUW'LUž  0' 79'     6WDUW'LUž  0' 79'     7RWDO'HSWK 0' 79' 30 &203$66%XLOG(3DJH &OHDUDQFH6XPPDU\$QWLFROOLVLRQ5HSRUW-XQH+LOFRUS$ODVND//&0LOQH3RLQW03W/3DG03/038/$038/$ZS5HIHUHQFH'HVLJQ03W/3DG03/038/$038/$ZS&ORVHVW$SSURDFK'3UR[LPLW\6FDQRQ&XUUHQW6XUYH\'DWD +LJKVLGH5HIHUHQFH :HOO&RRUGLQDWHV1( ƒ 1ƒ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eparation Factor10750 10875 11000 11125 11250 11375 11500 11625 11750 11875 12000 12125 12250 12375 12500 12625 12750 12875 13000 13125Measured Depth (250 usft/in)MPC-17MPU L-06APB1No-Go Zone - Stop DrillingCollision Avoidance RequiredCollision Risk Procedures Req.WELL DETAILS:MPL-06 NAD 1927 (NADCON CONUS)Alaska Zone 04Ground Level: 17.00+N/-S +E/-W Northing Easting Latittude Longitude0.000.006031350.91 544919.9770° 29' 47.468 N149° 37' 57.645 WREFERENCE INFORMATIONCo-ordinate (N/E) Reference:Well MPL-06, True NorthVertical (TVD) Reference: MPL-06 Ref Elevation @ 56.00usftMeasured Depth Reference:MPL-06 Ref Elevation @ 56.00usftCalculation Method:Minimum CurvatureSURVEY PROGRAMDate: 2021-06-03T00:00:00 Validated: Yes Version: Depth From Depth To Survey/PlanTool100.00 10500.00 1 : Schlumberger GCT multishot (MPL-06) 3_Gyro-CT_pre-1998_Csg10562.00 10710.00 Survey #1 (MPU L-06APB1) 3_MWD10710.00 12800.00 MPU L-06A wp08 (MPU L-06A) 3_MWD0.0030.0060.0090.00120.00150.00180.00Centre to Centre Separation (60.00 usft/in)10750 10875 11000 11125 11250 11375 11500 11625 11750 11875 12000 12125 12250 12375 12500 12625 12750 12875 13000 13125Measured Depth (250 usft/in)MPL-06NO GLOBAL FILTER: Using user defined selection & filtering criteria10710.00 To 12800.00Project: Milne PointSite: M Pt L PadWell: MPL-06Wellbore: MPU L-06APlan: MPU L-06A wp08CASING DETAILSTVD TVDSS MD Size Name7199.62 7143.62 12800.00 2-7/8 2 7/8" x 3 1/4" _____________________________________________________________________________________ Revised By: JNL 6/3/2021 SCHEMATIC Milne Point Unit Well: MPU L-06 Last Completed: 2/18/2021 PTD: 190-010 TD =11,091’ (MD) /TD = 7,313’(TVD) Halliburton HOS Cementer at 1,881’ Baker 4-1/2”x7”WS fell to 10,582’ Orig. KB Elev. = 35’ Ground Elev. = 21’ RKB-THF: 23.95’ (Doyon 16) 7” 3 5 7 Est. TOC at 8,820’ 9-5/8” TOC @10,600’ Est. TOC at 2,000’ 6 PBTD =10,561’(MD) / PBTD =6,998’(TVD) KUP C/B Sands KUP A Sands Arctic Pack RA Tag at 10,304’ Top of window @ 10564’ 4 Baker 4 1/2x7” WS set @ 10561’ 2 1 ` CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8" Conductor 48# / H-40 / Weld 12.715 Surface 115' 0.157 9-5/8" Surface 36# / J-55 / BTC 8.921 Surface 6,314’ 0.0773 7" Production 26# / L-80 / BTC 6.276 Surface 11,068’ 0.0383 TUBING DETAIL 4-1/2” Tubing 12.6# / L-80 / TXP BTC 3.92 Surface 10,472’ 0.0152 JEWELRY DETAIL No Depth Item 1 31’ 4-1/2” Tubing Hanger 2 10,280’ Gauge Carrier 3 10,288’ HES X-line Sliding Sleeve, 3.813” Seal Bore ID 4 10,296’ Ported Pressure Sub 5 10,356’ 7” X 4-1/2” Premier Production Packer 6 10,425’ X Nipple, 3.813” 7 10,434’ WLEG, bottom at 10,472’ PERFORATION DETAIL KUP Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status KUP C1/B6 10,566’ 10,593’ 7,001’ 7,016’ 27 11/21/1990 Closed KUP B6 10,632’ 10,662’ 7,039’ 7,056 30 11/20/1990 Closed KUP B6 10,678’ 10,693’ 7,065’ 7,074’ 15 11/20/1990 Closed KUP B6 10,714’ 10,724’ 7,086’ 7,092’ 10 11/20/1990 Closed KUP A3 10,800’ 10,821’ 7,137’ 7,150’ 21 11/20/1990 Closed KUP A2 10,834’ 10,878’ 7,158’ 7,184’ 44 11/20/1990 Closed KUP A1 10,900’ 10,904’ 7,197’ 7,200’ 4 11/20/1990 Closed OPEN HOLE / CEMENT DETAIL 13-3/8" 485 sks Permafrost “C”in 30” Hole 9-5/8" 316 bbl Permafrost E, 67 bbl Class ‘G’ in 12-1/4” Hole 7” 65 bbl Class “G” in 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 700’ Max Hole Angle = 57° @ 4,600’ Max Hole Angle through perforations = 55° TREE & WELLHEAD Tree 4-1/16” 5K CIW (dry hole) Wellhead FMC 11"x 4-1/2" Hanger, 4.5" TCII top/btm w/ 2- 3/8'' ports GENERAL WELL INFO API: 50-029-22003-00-00 Drilled and Completed by Pool Rig 102 - 11/27/1990 ESP RWO by Rig 4 – 9/25/1993 ESP RWO by Nabors 4ES – 11/21/1998 ESP RWO by Nabors 4ES – 4/9/2001 ESP RWO by Nabors 4ES – 6/17/2005 ESP RWO by Nabors 4ES- 7/9/2007 ESP RWO by Nabors 3S- 11/28/2008 Pull ESP, set CIBP, Run Killstring by Doyon 16 - 5/21/2012 RWO by Doyon 14 – 2/19/2021 _____________________________________________________________________________________ Revised By: JNL 6/3/2021 PROPOSED Milne Point Unit Well: MPU L-06A Last Completed: TBD PTD: 211-011 2-3/8” Solid to Slotted Liner @11,400’ GENERAL WELL INFO API: 50-029-22003-01-00 Drilled and Completed by Pool Rig 102 - 11/27/1990 Pull ESP, set CIBP, Run Killstring by Doyon 16 - 5/21/2012 RWO Tubing Swap: 2/19/2021 A Sidetrack: TBD CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8" Conductor 48# / H-40 / Weld 12.715 Surface 115' 0.157 9-5/8" Surface 36# / J-55 / BTC 8.921 Surface 6,314’ 0.0773 7" Production 26# / L-80 / BTC 6.276 Surface 10,567’ 0.0383 3-1/4” Solid Liner 6.6 # / L-80 / TCII 10,430’ 11,400’ 2-3/8” Slotted Liner 6.5# / L-80 / Hyd511 10,420’ 12,800’ TUBING DETAIL 4-1/2” Tubing 12.6# / L-80 / TXP BTC 3.92 Surface 10,472’ 0.0152 JEWELRY DETAIL No Depth Item 1 31’ 4-1/2” Tubing Hanger 2 10,280’ Gauge Carrier 3 10,288’ HES X-line Sliding Sleeve, 3.813” Seal Bore ID 4 10,296’ Ported Pressure Sub 5 10,356’ 7” x 4-1/2” Premier Production Packer 6 10,425’ X Nipple, 3.813” 7 10,434’ WELG, bottom at 10,472’ SLOTTED LINER DETAIL KUP Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kuparuk A OPEN HOLE / CEMENT DETAIL 30" 485 sks Permafrost “C” 12-1/4" 316 bbl Permafrost E, 67 bbl Class ‘G’ 8-1/2” 65 bbl Class “G” 4-1/4” Uncemented Solid Liner 3” Uncemented Solid / Slotted Liner WELL INCLINATION DETAIL KOP @ 700’ Max Hole Angle = 90° @ 11,775’ A Top of Window @ 10,564’ TREE & WELLHEAD Tree 4-1/16” 5K CIW (dry hole) Wellhead FMC 11"x 4-1/2" Hanger, 4.5" TCII top/btm w/ 2- 3/8'' ports TD =12,800’ (MD) /TD =7,200’(TVD) Halliburton HOS Cementer at 1,881’ Orig. KB Elev. = 56.0’ Ground Elev. = 17.0’ RKB-THF: 23.95’ (Doyon 16) 3 5 7 2-3/8” Est. TOC at 8,820’ 9-5/8” Top of 3-1/4” Liner @10,430’ Est. TOC at 2,000’ 6 PBTD = 12,800’(MD) / PBTD=7,200’(TVD) Top of 2-3/8” Liner @10,420’ RA Tag at 10,304’ Arctic Pack Top of Window @10,564’ 4 2 1 ` 7" to 10,561 Well Bighole Date Quick Test Sub to Otis -1.1 ft Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular 6.0 ft Top of Annular Element 6.7 ft Bottom Annular 8.0 ft CL Blind/Shears 9.3 ft CL 2-3/8" Pipe/Slips 10.1 ft B1 B2 B3 B4 Choke Line Kill Line CL 3" Pipe/Slips 12.6 ft CL 2-3/8" Pipe/Slips 13.4 ft CL of Top Swab 16.0 ft Swab Test Pump Hose T1 T2 Swab 1 CL of Flow Cross 17.4 ft Master CL of Master 18.8 ft LDS IA OA LDS Ground Level CDR2-AC 4 Ram BOP Schematic 15-Jan-21 CDR2 Rig's Drip Pan 7-1/16" 5k Flange X 7" Otis Box Hydril 7 1/16" Annular 2-3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2-3/8"Pipe/Slips Blind/Shear 7-1/16" 5 Mud Cross 3" Pipe/Slips Otis 0.0 ft from top of riser quick-test sub nular 6.0 ft nular Element 6.7 ft nular 8.0 ft hears 9.3 ft Slips 10.1 ft B1 B2 B3 B4 Choke Line Kill Line ipe/Slips 12.6 ft Slips 13.4 ft CL of Top Swab 16.0 ft Swab Test Pump Hose T1 T2 Swab 1 CL of Flow Cross 17.4 ft Master CL of Master 18.8 ft LDS IA OA LDS Ground Level CDR2 Rig's Drip Pan 7-1/16" 5k Flange X 7" Otis Box Hydril 7 1/16" Annular 2" Pipe/Slips 2" Pipe/Slips Blind/Shear 7-1/16" 5 Mud Cross 2-3/8" Pipe/Slips Revised 2/2015 TRANSMITTAL LETTER CHECKLIST WELL NAME: ______________________________________ PTD: _____________________________________________ ___ Development ___ Service ___ Exploratory ___ Stratigraphic Test ___ Non-Conventional FIELD: ____________________________ POOL: ______________________________________ Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL (If last two digits in API number are between 60-69) The permit is for a new wellbore segment of existing well Permit No. _____________, API No. 50-_______________________. Production should continue to be reported as a function of the original API number stated above. Pilot Hole In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name (_______________________PH) and API number (50-_____________________) from records, data and logs acquired for well (name on permit). Spacing Exception The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. (_____________________________) as Operator assumes the liability of any protest to the spacing exception that may occur. Dry Ditch Sample All dry ditch sample sets submitted to the AOGCC must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non- Conventional Well Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for well ( ) until after ( ) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (________________________) must contact the AOGCC to obtain advance approval of such water well testing program. Well Logging Requirements Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (_______________________________) in the attached application, the following well logs are also required for this well: Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Milne Point Unit X MPU L-06A X X Kuparuk Oil 221-011 (Revised) WELL PERMIT CHECKLISTCompanyHilcorp Alaska, LLCWell Name:MILNE PT UNIT L-06AInitial Class/TypeDEV / 1-OILGeoArea890Unit11328On/Off ShoreOnProgramDEVField & PoolWell bore segAnnular DisposalPTD#:2210110MILNE POINT, KUPARUK RIVER OIL - 525100NA1 Permit fee attachedYes2 Lease number appropriateYes3 Unique well name and numberYes4 Well located in a defined poolYes5 Well located proper distance from drilling unit boundaryYes6 Well located proper distance from other wellsYes7 Sufficient acreage available in drilling unitYes Directional plan view included, no land plat.8 If deviated, is wellbore plat includedYes9 Operator only affected partyYes10 Operator has appropriate bond in forceYes11 Permit can be issued without conservation orderYes12 Permit can be issued without administrative approvalYes13 Can permit be approved before 15-day waitNA14 Well located within area and strata authorized by Injection Order # (put IO# in comments) (For servNA15 All wells within 1/4 mile area of review identified (For service well only)NA16 Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)NA This is a CTD sidetrack exiting an existing wellbore. All drilling within the reservoir.18 Conductor string providedNA This is a CTD sidetrack exiting an existing wellbore. All drilling within the reservoir.19 Surface casing protects all known USDWsNA This is a CTD sidetrack exiting an existing wellbore. All drilling within the reservoir.20 CMT vol adequate to circulate on conductor & surf csgNA This is a CTD sidetrack exiting an existing wellbore. All drilling within the reservoir.21 CMT vol adequate to tie-in long string to surf csgYes This is a CTD sidetrack exiting an existing wellbore. All drilling within the reservoir.22 CMT will cover all known productive horizonsYes Solid by slotted uncemented production liner.23 Casing designs adequate for C, T, B & permafrostYes CDR 2 has adequate pits. 1-1/2 wellbore volume of KWF will be stored on location.24 Adequate tankage or reserve pitYes Sundry 321-042 for cemented perfs approved.25 If a re-drill, has a 10-403 for abandonment been approvedYes No collision risks for planned wellbore.26 Adequate wellbore separation proposedNA This is a CTD sidetrack exiting an existing wellbore. All drilling within the reservoir.27 If diverter required, does it meet regulationsYes Dynamically overbalanced drilling, pressure deployment/undeployment of BHA. KWF for liner running.28 Drilling fluid program schematic & equip list adequateYes 1 CT packoff, 1 annular, 1 flow cross, 4 ram CT stack. Lubricator and double ball valves in BHA.29 BOPEs, do they meet regulationYes 5M 7-1/16" stack tested to 3500 psi.30 BOPE press rating appropriate; test to (put psig in comments)Yes31 Choke manifold complies w/API RP-53 (May 84)Yes CDR 2 will be in ongoing operations32 Work will occur without operation shutdownYes MPU L-Pad is an H2S pad. H2S montoring will be provided.33 Is presence of H2S gas probableNA34 Mechanical condition of wells within AOR verified (For service well only)No H2S measures required. Potential exists to encounter H2S in this mature reservoir.35 Permit can be issued w/o hydrogen sulfide measuresYes36 Data presented on potential overpressure zonesNA37 Seismic analysis of shallow gas zonesNA38 Seabed condition survey (if off-shore)NA39 Contact name/phone for weekly progress reports [exploratory only]ApprDLBDate1/25/2021ApprMGRDate1/26/2021ApprDLBDate1/26/2021AdministrationEngineeringGeologyGeologic Commissioner:DTSDate:1/26/2021Engineering Commissioner:JLCDate1/27/2021Public CommissionerJMPDate1/27/2021 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: 2.Operator Name:4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception?Yes No 9.Property Designation (Lease Number):10.Field/Pool(s): 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD): ~12,121 None Casing Collapse Conductor Surface 3,090 psi Intermediate 5,410 psi Liner Liner Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13.Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14.Estimated Date for 15. Well Status after proposed work: Commencing Operations:OIL WINJ WDSPL Suspended 16.Verbal Approval:Date:GAS WAG GSTOR SPLUG Commission Representative: GINJ Op Shutdown Abandoned Monty Myers Contact Name:Trevor Hyatt Drilling Manager Contact Email:trevor.hyatt@hilcorp.com Contact Phone: 777-8396 Date: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Post Initial Injection MIT Req'd? Yes No Spacing Exception Required? Yes No Subsequent Form Required: APPROVED BY Approved by:COMMISSIONER THE COMMISSION Date: Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng 2-3/8"10,420' - 12,121'6,863' - 7,410' ~870'3-1/4"10,430' - 11,300'6,869' - 7,104' COMMISSION USE ONLY Authorized Name: Authorized Title: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL 025509 & 047434 221-011 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 Milne Point Field / Kuparuk Oil Pool 50-029-22003-01-00 Hilcorp Alaska LLC Length Size ~7,410' ~12,121' ~7,410' MD C.O. 432D PRESENT WELL CONDITION SUMMARY MPU L-06A L-80 TVD Burst 10,472' 7,240 psi Tubing Size: Tubing Grade: ~1,701' 5,750 psi 115' 4,590' 115' 3,333 None 7" Perforation Depth TVD (ft): 4-1/2" Premier Production Packer 10,356' / 6,881' Tubing MD (ft): 13-3/8" 9-5/8" 115' 6,314' 10,567'10,567' 7,002' Authorized Signature: 6,314' May 22, 2021 4-1/2", 12.6# Perforation Depth MD (ft): ~11,621' - 12,141' ~7,156' - 7,410' ory Statu Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval. 5.18.2021 By Samantha Carlisle at 3:33 pm, May 18, 2021 321-246 Digitally signed by Monty M Myers DN: cn=Monty M Myers, c=US, o=Hilcorp Alaska, LLC, ou=Technical Services - AK Drilling, email=mmyers@hilcorp.com Reason: I am approving this document Date: 2021.05.18 14:18:44 -08'00' Monty M Myers 10-407 BOPE test to 3500 psi. Annular to 3500 psi. MGR18MAY21 SFD 5/18/2021 DSR-5/18/21  dts 5/19/2021 JLC 5/20/2021 Jeremy Price Digitally signed by Jeremy Price Date: 2021.05.20 13:27:06 -08'00' RBDMS HEW 6/2/2021 To: Alaska Oil & Gas Conservation Commission From: Trevor Hyatt Drilling Engineer Date: May 18, 2021 Re: MPU L-06A & AL1 Permit to Drill Request Approval is requested for drilling a CTD sidetrack lateral from well MPU L-06 with the Nabors CDR2 Coiled Tubing Drilling rig on or around May 2021. Proposed plan for MPU L-06A & AL1 Producer: Prior to drilling activities, the wellbore will be prepared for a sidetrack (see L-06 Sundry request). The 2-7/8” kill string has been pulled, cement milled, and a 4-1/2” production string run. An E-line unit will set a 4-1/2” x 7” CTD whipstock in the Kuparuk interval. A ~2,133’ MD coil tubing drilling, dual lateral, sidetrack will be drilled with the Nabors CDR2 rig. The rig will move in, test BOPE and kill the well. A single string window exit + 10’ of rathole will be milled out of the 7”. The first lateral (L-06A) will kick off in the Kuparuk C, build through the B and land in the A to cross a major fault into the Kuparuk C to the south. If determined necessary (problematic shales open), intermediate TD will be called once confirmed in the Kuparuk C sand and a 3-1/2” x 3-1/4” solid protection liner will be run. The rig will downsize from 2-3/8” to 2” coil and mill out the bottom shoe of the protection string. The well will then continue in this new fault block down into the Kuparuk A to TD. The lateral will then be completed with 2-3/8" L-80 slotted liner with a liner top billet set in the C sand. The second lateral (L-06AL1) will then kick off the liner top billet and drill a lateral in the Kuparuk C to the south. The lateral will then be completed with a 2-3/8” L-80 solid/slotted liner from liner top to TD. If it is determined that problematic shale is not crossed at the fault crossing, the two laterals will be drilled as originally planned bighole (2-3/8” coil) 4.06” - 4.25” hole and 2-7/8” solid/slotted liner ran in both laterals. The following describes the work planned. A wellbore schematic of the current well and proposed sidetrack is attached for reference. Pre-Rig Work: 1. Reference MPU L-06 Sundry submitted in concert with this PTD request 2. General work scope of Pre-Rig work: a. Rig: Pull kill string b. Rig: Mill cement and retainer to 10,600’ MD c. Rig: Run 4-1/2” production string d. E-line: Set 4-1/2” x 7” whipstock top at ~10,562’ MD, 25 deg ROHS Rig Work: 3. MIRU and test BOPE to 3500 psi. MASP with gas (0.10 psi/ft) to surface is 3333 psi a. Give AOGCC 24hr notice prior to BOPE test b. Test against swab and master valves (No TWC) c. Load pits with drilling fluid d. Open well and ensure zero pressure 4. Mill 3.80” single string window (out of 7”) plus 10’ of rathole. a. Top of planned window (whipstock pinch point) at 10567’, 25 ROHS. b. Mill window with 0.6° bend motor c. Pressure deployment is required for the window milling run i. SBHPS 04/10/12 4,033 psi at 7,001’ TVD (11.1 ppg EMW) d. Hold 11.8 ppg MPD while milling window g (11.1 ppg EMW) 5. Drill L-06A Build – Protection String Section a. 3” BHA with GR/RES / Bi-center Bit (4.06” - 4.25”) b. 40° DLS build section – 437’ MD / Planned TD 11,004’ MD c. 12° DLS lateral section – 296’ MD / Planned TD 11,300’ MD (past fault) d. Drill through Kuparuk C, B, A and land in C sand on other side of fault e. Drill with a constant bottom hole pressure for entire sidetrack f. Pressure deployment will be utilized g. After TD and on the last trip out of hole lay in completion/kill weight fluid in preparation for liner run h. No flow test prior to laying down drilling BHA i. If determined no problematic shale crossed at fault, continue to L-06A TD (12,120’ MD) with bighole and don’t run protection string. Then go to step 14. 6. Run 3-1/4” L-80 solid liner (protection string) with bullnose shoe a. Top of liner left inside 4-1/2” tubing b. Have 2-3/8” safety joint with TIW valve ready to be picked up while running liner 7. Swap equipment and reel from 2-3/8” to 2” coil 8. Test BOPE 250 psi low and 3,500 psi high for rams / 3,500 psi high for annular (MASP of 3,333 psi) a. Provide 24-hour notice to AOGCC to witness b. Test against swab and master valves (No TWC) 9. Mill out 3-1/4” shoe with 2.74” Mill + 10’ of rathole 10. Drill – First Lateral (L-06A) a. 2-3/8” BHA with GR/RES / Bi-center Bit (3”) b. 12° DLS lateral section – 821’ MD / Planned TD 12,121’ MD c. Drill with a constant bottom hole pressure for entire sidetrack d. Pressure deployment will be utilized e. After TD and on the last trip out of hole lay in completion/kill weight fluid in preparation for liner run f. No flow test prior to laying down drilling BHA 11. Run 2-3/8” L-80 solid/slotted liner (L-06A) a. Have 2-3/8” safety joint with TIW valve ready to be picked up while running liner b. Liner top billet (top of liner to be ~11,621’ MD) c. Liner may be run in two sections if weight transfer or hole conditions is poor 12. Drill – Second Lateral (L-06AL1) a. 2-3/8” BHA with GR/RES / Bi-center Bit (3”) b. 12° DLS lateral section – 579’ MD / Planned TD 12,200’ MD c. Drill with a constant bottom hole pressure for entire sidetrack d. Pressure deployment will be utilized e. After TD and on the last trip out of hole lay in completion/kill weight fluid in preparation for liner run f. No flow test prior to laying down drilling BHA 13. Run 2-3/8” L-80 solid/slotted liner (L-06AL1) a. Have 2-3/8” safety joint with TIW valve ready to be picked up while running liner b. Liner may be run in two sections if weight transfer or hole conditions is poor c. After releasing from the liner swap the well over to 2% KCl d. Freeze protect well from ~2200’ MD (min) e. RDMO 14. ***If no problematic shale is crossed at fault continue with lateral on bighole as follows. 15. Run 2-7/8” L-80 slotted liner (L-06A) a. Have 2-3/8” safety joint with TIW valve ready to be picked up while running liner b. Liner top billet (top of liner to be ~11,621’ MD) c. Liner may be run in two sections if weight transfer or hole conditions is poor PTD for L-06L1 Sundry 321-246/PTD221-011 if no shale problems in step 5. End or sundry 321-246/PTD221-011 if shale problems in step 5. PTD for L-06L1 16. Drill – Second Lateral (L-06AL1) a. 3” BHA with GR/RES / Bi-center Bit (4.06” - 4.25”) b. 12° DLS lateral section – 579’ MD / Planned TD 12,200’ MD c. Drill with a constant bottom hole pressure for entire sidetrack d. Pressure deployment will be utilized e. After TD and on the last trip out of hole lay in completion/kill weight fluid in preparation for liner run f. No flow test prior to laying down drilling BHA 17. Run 2-7/8” L-80 solid/slotted liner (L-06AL1) a. Have 2-3/8” safety joint with TIW valve ready to be picked up while running liner b. Liner may be run in two sections if weight transfer or hole conditions is poor c. After releasing from the liner swap the well over to 2% KCl d. Freeze protect well from ~2200’ MD (min) e. RDMO Post Rig: 1. V: Tree work as necessary 2. S: Install LTP Managed Pressure Drilling: The history of CTD at KRU in the Kuparuk reservoir, has demonstrated the benefits of a managed pressure drilling technique. Due to uncertainties about the bottom hole pressures to be encountered as this sidetrack is drilled, managed pressure drilling techniques will be employed on this well. The intent is to provide constant bottom hole pressure by using minimum 8.7 ppg drilling fluid in combination with annular friction losses and applied surface pressure. Constant BHP will be utilized to reduce pressure fluctuations to help with hole stability. Applying annular friction and choke pressure also allow use of lighter drilling fluid and minimizes fluid losses and/or fracturing at the end of the long well bores. A MPD choke for regulating surface pressure is located between the WC choke manifold and the mud pits and will be independent of the WC choke. Deployment of the BHA under trapped wellhead pressure will be necessary. Pressure deployment of the BHA will be accomplished utilizing 3” (bighole) & 2-3/8” (slimhole) pipe/slip rams (see attached BOP configurations). The annular preventer will act as a secondary containment during deployment and not as a stripper. Operating parameters and fluid densities will be adjusted based on real-time bottom hole pressure measurements while drilling and shale behavior. The following scenario is expected for MPL-06A & AL1: x Latest reservoir pressure in the parent well: 4033 psi (11.1 ppg) MPD Pressure at the MPU L-06 Planned Window (10562’ MD - 7001’ TVD) Pumps On Pumps Off A Target BHP at Window (ppg)4,296 psi 4,296 psi 11.8 B Annular friction - ECD (psi/ft)634 psi 0 psi 0.06 (slimhole) C Mud Hydrostatic (ppg)3,167 psi 3,167 psi 8.7 B+C 3,801 psi 3,167 psi (no choke pressure) A-(B+C)Choke Pressure Required to Maintain 495 psi 1,129 psi Target BHP at window and deeper 8.7 ppg drilling fluid p 4033 psi (11.1 ppg) qp managed pressure drilling techniques will be employed on this well. qpy Operation Details: Reservoir Pressure: x The maximum reservoir pressure for L-06A & AL1 is expected to be 4033 psi at 7001’ TVD (11.1 ppg equivalent). x Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 3333 psi. Mud Program: x Drilling: Minimum MW of 8.6 ppg KCL with Geovis for drilling. Managed pressure used to maintain constant BHP. x KWF will be stored on location. The tankage will contain 1.5 wellbore volumes of KWF (11.3 ppg expected) to exceed the maximum possible BHP to be encountered as the lateral is drilled. Adjust with real time BHP monitoring. x Completion: A minimum MW 11.3 ppg KWF to be used for liner deployment. Will target 11.8 ppg to match managed pressure target. Disposal: x All cuttings & mud generated during drilling operations will be hauled to the Milne Point “B” pad G&I facility. Hole Size: x 4.06” - 4.25” bicenter hole for build and lateral to cross fault (potential to drill both laterals with this size if no protection string is ran). x 3” bicenter hole after 3-1/4” protection string is ran across fault. Liner Program: Protection String and downsize to 2” coil (slimhole) scenario L-06A x 3-1/4” 6.6#, L-80 solid liner: 10,430’ MD – 11,300’ MD x 2-3/8”, 6.5#, L-80 slotted liner: 11,621’ MD – 12,121’ MD L-06AL1 x 2-3/8”, 6.5#, L-80 solid liner: 10,420’ MD – 11,550’ MD x 2-3/8”, 6.5#, L-80 slotted liner: 11,550’ MD – 12,200’ MD No Protection String and stay on 2-3/8” coil (bighole) scenario L-06A x 2-7/8”, 6.5#, L-80 slotted liner: 11,621’ MD – 12,121’ MD L-06AL1 x 2-7/8”, 6.5#, L-80 solid liner: 10,420’ MD – 11,550’ MD x 2-7/8”, 6.5#, L-80 slotted liner: 11,550’ MD – 12,200’ MD x No Cement. A liner top packer will be run post rig to facilitate production from the new fault block. x The primary barrier for this operation: Kill Weight Fluid to provide overbalance as necessary x A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: x Two BOP diagrams are attached. MPD and pressure deployment is planned. x Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. x The annular preventer will be tested to 250 psi and 3,500 psi. x An X-over shall be made up to a 2-3/8” safety joint including a TIW valve for all tubulars ran in hole. x 1.5 wellbore volumes of KWF will be on location at all times during drilling operations. x Exemption request to 20 AAC 25.036 - Liner rams in the BOPE. A 2-3/8” safety joint will be utilized while running 2-3/8” slotted liner, 3-1/4” solid liner (protection string) or 2-7/8” solid/slotted liner (no protection string scenario). The desire is to keep the same standing orders for the entire liner run and not change shut in techniques (run safety joint with pre-installed TIW valve). When closing on a 2-3/8” safety joint 2 sets of rams will be available, above and below the flow cross providing better well control option. (11.1 ppg Directional: x Directional plan attached. Maximum planned hole angle is 97° x Inclination at kick off point is 56°. x Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. x Distance to nearest property line – 10,612’ x Distance to nearest well within pool – 1,675’ (C-17) Logging: x MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. x Real time bore pressure to aid in MPD and ECD management. Perforating: x No perforating, slotted liner. Anti-Collision Failures: x No failures for L-06A or AL1 Hazards: x MPU L-pad is considered a high H2S pad. The highest recorded H2S well on the pad was from MPU L-32 (410 ppm) in 2009. The maximum recorded value on L-06 is 3 ppm (12/17/2009). Drilling L-06A into a new fault block has a low H2S risk. x Fault crossing. Potential to go from an 11.1 ppg EMW to 8.5 ppg EWM. Use mud viscosity to mitigate differential sticking and losses. x Medium lost circulation risk. Trevor Hyatt CC: Well File Drilling Engineer Joseph Lastufka 907-223-3087 g Medium lost circulation risk. Fault crossing. Potential to go from an 11.1 ppg EMW to 8.5 ppg EWM. MPU L-pad is considered a high H2S pad. 6WDQGDUG3URSRVDO5HSRUW 0D\ 3ODQ038/$ZS +LOFRUS$ODVND//& 0LOQH3RLQW 03W/3DG 03/ 038/$ 6667683370007167733375007667True Vertical Depth (250 usft/in)5667 5833 6000 616763336500 6667 6833 7000 7167 7333 7500 7667 7833Vertical Section at 56.79° (250 usft/in)MPU L-06A wp06 PolygonMPL-06A wo05 tgt710000105001100011091MPL-061 1 0 0 0 115001200012121MPU L-06A wp06KOP : Start Dir 9º/100' : 10567' MD, 7001.55'TVD : 30° RT TFStart Dir 40º/100' : 10587' MD, 7012.68'TVDStart Dir 12º/100' : 11004.33' MD, 7126.6'TVDTotal Depth : 12120.95' MD, 7409.9' TVDWELL DETAILS: MPL-06 NAD 1927 (NADCON CONUS) Alaska Zone 04Ground Level:17.00+N/-S +E/-W Northing EastingLatittude Longitude0.00 0.006031350.910544919.97070° 29' 47.468 N149° 37' 57.645 WCASING DETAILSTVD TVDSS MD Size Name7409.90 7353.90 12120.95 2-3/8 2 3/8" x 3 1/4"FORMATION TOP DETAILSNo formation data is availableProject: Milne PointSite: M Pt L PadWell: MPL-06Wellbore: MPU L-06ADesign: MPU L-06A wp06SECTION DETAILSSec MD Inc Azi TVD +N/-S +E/-W Dleg TFace VSect Target Annotation1 10567.00 55.41 55.41 7001.55 4248.53 5873.80 0.00 0.00 7241.37 KOP : Start Dir 9º/100' : 10567' MD, 7001.55'TVD : 30° RT TF2 10587.00 56.98 56.49 7012.68 4257.83 5887.57 9.00 30.00 7257.99 Start Dir 40º/100' : 10587' MD, 7012.68'TVD3 10655.17 82.00 68.19 7036.45 4286.70 5943.80 40.00 26.00 7320.854 11004.33 84.72 210.00 7126.60 4093.91 6108.17 40.00 108.00 7352.78 Start Dir 12º/100' : 11004.33' MD, 7126.6'TVD5 11054.33 80.89 214.65 7132.86 4052.00 6081.66 12.00 130.00 7307.656 11254.33 85.30 238.42 7157.25 3916.60 5938.51 12.00 81.00 7113.737 11369.33 91.20 225.93 7160.77 3846.27 5847.95 12.00 -65.00 6999.438 11519.33 91.14 243.94 7157.68 3760.47 5725.70 12.00 90.00 6850.169 11594.33 91.13 234.94 7156.19 3722.38 5661.20 12.00 -90.00 6775.3310 12120.95 27.93 234.94 7409.90 3474.65 5308.22 12.00 180.00 6344.32 MPL-06A wo05 tgt7 Total Depth : 12120.95' MD, 7409.9' TVDSURVEY PROGRAMDate: 2021-01-21T00:00:00 Validated: Yes Version: Depth FromDepth To Survey/PlanTool100.00 10567.00 1 : Schlumberger GCT multishot (MPL-06) 3_Gyro-CT_pre-1998_Csg10567.00 12120.95 MPU L-06A wp06 (MPU L-06A) 3_MWD 330034003500360037003800390040004100420043004400450046004700South(-)/North(+) (200 usft/in)4900 5000 5100 5200 5300 5400 5500 5600 5700 5800 5900 6000 6100 6200 6300 6400 6500 6600 6700 6800West(-)/East(+) (200 usft/in)MPL-06A wo05 tgt7MPU L-06A wp06 Polygon6 25 0650067507000 7 2 5 0 7 3 1 9 M P L -0 6 2 3/8" x 3 1/4"7 2 5 0 7 4 1 0 M P U L -0 6 A w p 0 6KOP : Start Dir 9º/100' : 10567' MD, 7001.55'TVD : 30° RT TFStart Dir 40º/100' : 10587' MD, 7012.68'TVDStart Dir 12º/100' : 11004.33' MD, 7126.6'TVDTotal Depth : 12120.95' MD, 7409.9' TVDCASING DETAILSTVDTVDSS MDSize Name7409.90 7353.90 12120.95 2-3/8 2 3/8" x 3 1/4"Project: Milne PointSite: M Pt L PadWell: MPL-06Wellbore: MPU L-06APlan: MPU L-06A wp06WELL DETAILS: MPL-06Ground Level: 17.00+N/-S +E/-W Northing EastingLatittudeLongitude0.00 0.006031350.910544919.970 70° 29' 47.468 N149° 37' 57.645 WREFERENCE INFORMATIONCo-ordinate (N/E) Reference:Well MPL-06, True NorthVertical (TVD) Reference: MPL-06 Ref Elevation @ 56.00usftMeasured Depth Reference:MPL-06 Ref Elevation @ 56.00usftCalculation Method:Minimum Curvature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ƒ6ORW5DGLXV    ƒ 1 ƒ : :HOO :HOO3RVLWLRQ /RQJLWXGH /DWLWXGH (DVWLQJ 1RUWKLQJ XVIW (: 16 3RVLWLRQ8QFHUWDLQW\ XVIW XVIW XVIW*URXQG/HYHO 03/03/ XVIW XVIW     :HOOKHDG(OHYDWLRQXVIW ƒ 1 ƒ : :HOOERUH 'HFOLQDWLRQ ƒ )LHOG6WUHQJWK Q7 6DPSOH'DWH 'LS$QJOH ƒ 038/$ 0RGHO1DPH0DJQHWLFV %**0     3KDVH9HUVLRQ $XGLW1RWHV 'HVLJQ 038/$ZS 3/$1 9HUWLFDO6HFWLRQ 'HSWK)URP 79' XVIW 16 XVIW 'LUHFWLRQ ƒ (: XVIW 7LH2Q'HSWK  ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 7RRO)DFH ƒ 16 XVIW 0HDVXUHG 'HSWK XVIW 9HUWLFDO 'HSWK XVIW 'RJOHJ 5DWH ƒXVIW %XLOG 5DWH ƒXVIW 7XUQ 5DWH ƒXVIW 3ODQ6HFWLRQV 79' 6\VWHP XVIW           30 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W/3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03/ 038/$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 03/5HI(OHYDWLRQ#XVIW 'HVLJQ038/$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH03/5HI(OHYDWLRQ#XVIW 1RUWK5HIHUHQFH :HOO03/ 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                                                                                                                                                                                                                        30 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W/3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03/ 038/$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 03/5HI(OHYDWLRQ#XVIW 'HVLJQ038/$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH03/5HI(OHYDWLRQ#XVIW 1RUWK5HIHUHQFH :HOO03/ 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                                                                                                                                                                                                          30 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W/3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03/ 038/$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 03/5HI(OHYDWLRQ#XVIW 'HVLJQ038/$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH03/5HI(OHYDWLRQ#XVIW 1RUWK5HIHUHQFH :HOO03/ 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                         .236WDUW'LUž  0' 79'ƒ577)         6WDUW'LUž  0' 79'                                                                                                                                                                         30 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W/3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03/ 038/$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 03/5HI(OHYDWLRQ#XVIW 'HVLJQ038/$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH03/5HI(OHYDWLRQ#XVIW 1RUWK5HIHUHQFH :HOO03/ 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                                         6WDUW'LUž  0' 79'                                                                                                                                                                         30 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W/3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03/ 038/$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 03/5HI(OHYDWLRQ#XVIW 'HVLJQ038/$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH03/5HI(OHYDWLRQ#XVIW 1RUWK5HIHUHQFH :HOO03/ 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                                                                                         7RWDO'HSWK 0' 79'[ 30 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W/3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03/ 038/$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 03/5HI(OHYDWLRQ#XVIW 'HVLJQ038/$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH03/5HI(OHYDWLRQ#XVIW 1RUWK5HIHUHQFH :HOO03/ 7UXH 7DUJHW1DPH KLWPLVVWDUJHW 6KDSH 79' XVIW 1RUWKLQJ XVIW (DVWLQJ XVIW 16 XVIW (: XVIW 7DUJHWV 'LS$QJOH ƒ 'LS'LU ƒ 03/$ZRWJW     SODQKLWVWDUJHWFHQWHU 3RLQW 038/$ZS3RO\JRQ      SODQKLWVWDUJHWFHQWHU 3RO\JRQ 3RLQW   3RLQW   3RLQW   3RLQW   3RLQW   3RLQW   3RLQW   3RLQW   3RLQW   3RLQW   3RLQW   3RLQW   3RLQW   3RLQW   9HUWLFDO 'HSWK XVIW 0HDVXUHG 'HSWK XVIW &DVLQJ 'LDPHWHU  +ROH 'LDPHWHU  1DPH &DVLQJ3RLQWV [  0HDVXUHG 'HSWK XVIW 9HUWLFDO 'HSWK XVIW (: XVIW 16 XVIW /RFDO&RRUGLQDWHV &RPPHQW 3ODQ$QQRWDWLRQV     .236WDUW'LUž  0' 79'ƒ577)     6WDUW'LUž  0' 79'     6WDUW'LUž  0' 79'     7RWDO'HSWK 0' 79' 30 &203$66%XLOG(3DJH &OHDUDQFH6XPPDU\$QWLFROOLVLRQ5HSRUW0D\+LOFRUS$ODVND//&0LOQH3RLQW03W/3DG03/038/$038/$ZS5HIHUHQFH'HVLJQ03W/3DG03/038/$038/$ZS&ORVHVW$SSURDFK'3UR[LPLW\6FDQRQ&XUUHQW6XUYH\'DWD +LJKVLGH5HIHUHQFH :HOO&RRUGLQDWHV1( ƒ 1ƒ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eparation Factor10575 10650 10725 10800 10875 10950 11025 11100 11175 11250 11325 11400 11475 11550 11625 11700 11775 11850 11925 12000Measured Depth (150 usft/in)MPC-17MPL-06No-Go Zone - Stop DrillingCollision Avoidance RequiredCollision Risk Procedures Req.WELL DETAILS:MPL-06 NAD 1927 (NADCON CONUS)Alaska Zone 04Ground Level: 17.00+N/-S +E/-W Northing Easting Latittude Longitude0.000.006031350.910544919.970 70° 29' 47.468 N149° 37' 57.645 WREFERENCE INFORMATIONCo-ordinate (N/E) Reference:Well MPL-06, True NorthVertical (TVD) Reference: MPL-06 Ref Elevation @ 56.00usftMeasured Depth Reference:MPL-06 Ref Elevation @ 56.00usftCalculation Method: Minimum CurvatureSURVEY PROGRAMDate: 2021-01-21T00:00:00 Validated: Yes Version: Depth From Depth To Survey/PlanTool100.00 10567.00 1 : Schlumberger GCT multishot (MPL-06) 3_Gyro-CT_pre-1998_Csg10567.00 12120.95 MPU L-06A wp06 (MPU L-06A) 3_MWD0.0030.0060.0090.00120.00150.00180.00Centre to Centre Separation (60.00 usft/in)10575 10650 10725 10800 10875 10950 11025 11100 11175 11250 11325 11400 11475 11550 11625 11700 11775 11850 11925 12000Measured Depth (150 usft/in)NO GLOBAL FILTER: Using user defined selection & filtering criteria10567.00 To 12120.95Project: Milne PointSite: M Pt L PadWell: MPL-06Wellbore: MPU L-06APlan: MPU L-06A wp06CASING DETAILSTVD TVDSS MD Size Name7409.90 7353.90 12120.95 2-3/8 2 3/8" x 3 1/4" _____________________________________________________________________________________ Revised By: JNL 5/18/2021 PROPOSED Milne Point Unit Well: MPU L-06A / AL1 Last Completed: TBD PTD: 211-011 / TBD L-06AL1 TD = 12,200’ (MD) / TD = 7,138’ (TVD) PBTD = 12,200’ (MD) / PBTD = 7,138’ (TVD)2-3/8” Solid to Slotted Liner @11,550’ AL1 Billet set @11,621’ GENERAL WELL INFO API: 50-029-22003-01-00 & 50-029-22003-60-00 Drilled and Completed by Pool Rig 102 - 11/27/1990 Pull ESP, set CIBP, Run Killstring by Doyon 16 - 5/21/2012 RWO Tubing Swap: 2/19/2021 A & AL1 Sidetrack: TBD TD =12,121’ (MD) /TD =7,410’(TVD) Halliburton HOS Cementer at 1,881’ Orig. KB Elev. = 56.0’ Ground Elev. = 17.0’ RKB-THF: 23.95’ (Doyon 16) 7” 3 5 7 2-7/8” Est. TOC at 8,820’ 9-5/8” Top of 3-1/4” Liner @10,430’ Est. TOC at 2,000’ 6 PBTD = 12,121’(MD) / PBTD=7,410’(TVD) Top of 2-3/8” Liner @10,420’ RA Tag at 10,304’ Arctic Pack Top of Window @10,567’ 4 2 1 ` CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8" Conductor 48# / H-40 / Weld 12.715 Surface 115' 0.157 9-5/8" Surface 36# / J-55 / BTC 8.921 Surface 6,314’ 0.0773 7" Production 26# / L-80 / BTC 6.276 Surface 10,567’ 0.0383 3-1/4” Solid Liner 6.6 # / L-80 / TCII 10,430’ 11,300’ A:2-3/8” Slotted Liner 6.5# / L-80 / Hyd511 11,621’ 12,121’ AL1:2-3/8” Solid/Slotted Liner 6.5# / L-80 / STL & Hyd511 10,420’ 12,200’ TUBING DETAIL 4-1/2” Tubing 12.6# / L-80 / TXP BTC 3.92 Surface 10,472’ 0.0152 JEWELRY DETAIL No Depth Item 1 31’ 4-1/2” Tubing Hanger 2 10,280’ Gauge Carrier 3 10,288’ HES X-line Sliding Sleeve, 3.813” Seal Bore ID 4 10,296’ Ported Pressure Sub 5 10,356’ 7” x 4-1/2” Premier Production Packer 6 10,425’ X Nipple, 3.813” 7 10,434’ WELG, bottom at 10,472’ SLOTTED LINER DETAIL KUP Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status L-06A: L-06AL1: OPEN HOLE / CEMENT DETAIL 30" 485 sks Permafrost “C” 12-1/4" 316 bbl Permafrost E, 67 bbl Class ‘G’ 8-1/2” 65 bbl Class “G” 4-1/4” Uncemented Solid Liner A: 3” Uncemented Solid / Slotted Liner AL1: 3” Uncemented Solid / Slotted Liner WELL INCLINATION DETAIL KOP @ 700’ Max Hole Angle = 57° @ 4,600’ Max Hole Angle through perforations = 55° A Top of Window @10,567 AL1 Top of Window @ 11,621’ Max Holengle through perforations = 55° TREE & WELLHEAD Tree 4-1/16” 5K CIW (dry hole) Wellhead FMC 11"x 4-1/2" Hanger, 4.5" TCII top/btm w/ 2- 3/8'' ports Well Bighole Date Quick Test Sub to Otis -1.1 ft Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular 6.0 ft Top of Annular Element 6.7 ft Bottom Annular 8.0 ft CL Blind/Shears 9.3 ft CL 2-3/8" Pipe/Slips 10.1 ft B1 B2 B3 B4 Choke Line Kill Line CL 3" Pipe/Slips 12.6 ft CL 2-3/8" Pipe/Slips 13.4 ft CL of Top Swab 16.0 ft Swab Test Pump Hose T1 T2 Swab 1 CL of Flow Cross 17.4 ft Master CL of Master 18.8 ft LDS IA OA LDS Ground Level CDR2-AC 4 Ram BOP Schematic 15-Jan-21 CDR2 Rig's Drip Pan 7-1/16" 5k Flange X 7" Otis Box Hydril 7 1/16" Annular 2-3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2-3/8"Pipe/Slips Blind/Shear 7-1/16" 5 Mud Cross 3" Pipe/Slips Well Slimhole Date Quick Test Sub to Otis -1.1 ft Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular 6.0 ft Top of Annular Element 6.7 ft Bottom Annular 8.0 ft CL Blind/Shears 9.3 ft CL 2" Pipe/Slips 10.1 ft B1 B2 B3 B4 Choke Line Kill Line CL 2-3/8" Pipe/Slips 12.6 ft CL 2" Pipe/Slips 13.4 ft CL of Top Swab 16.0 ft Swab Test Pump Hose T1 T2 Swab 1 CL of Flow Cross 17.4 ft Master CL of Master 18.8 ft LDS IA OA LDS Ground Level CDR2-AC 4 Ram BOP Schematic 21-Nov-17 CDR2 Rig's Drip Pan 7-1/16" 5k Flange X 7" Otis Box Hydril 7 1/16" Annular 2" Pipe/Slips 7-1/16" 5k Mud Cross 2" Pipe/Slips Blind/Shear 7-1/16" 5 Mud Cross 2-3/8" Pipe/Slips Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Monty M Myers Drilling Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Milne Point Field, Kuparuk Oil Pool, MPU L-06A Hilcorp Alaska, LLC Permit to Drill Number: 221-011 Surface Location: 2119' FNL, 318' FWL, Sec. 08, T13N, R10E, UM, AK Bottomhole Location: 1522' FSL, 600' FWL, Sec. 04, T13N, R10E, UM, AK Dear Mr. Myers: Enclosed is the approved application for the permit to drill the above referenced well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jeremy M. Price Chair DATED this ___ day of January, 2021. Sincerely, 27 1a. Type of Work: 1b. Proposed Well Class: Exploratory - Gas Service - WAG Service - Disp 1c. Specify if well is proposed for: Drill Lateral Stratigraphic Test Development - Oil Service - Winj Single Zone Coalbed Gas Gas Hydrates Redrill Reentry Exploratory - Oil Development - Gas Service - Supply Multiple Zone Geothermal Shale Gas 2. Operator Name: 5. Bond: Blanket Single Well 11. Well Name and Number: Bond No. 3. Address: 6. Proposed Depth: 12. Field/Pool(s): MD: 11,808' 7,411' 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 56.0' 15. Distance to Nearest Well Open Surface: x-544920 y- 6031351 Zone-4 17.0' to Same Pool: 1,730' 16. Deviated wells: Kickoff depth: 10567 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 87 degrees Downhole: Surface: Hole Casing Weight Grade Coupling Length MD TVD MD TVD 4-1/4" 2-7/8" 6.5# L-80 STL 1,388' 10,420' 6918' 11,808' 7,411' 19.PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Junk (measured): None TVD 115' 4,590' 7,240' None None Hydraulic Fracture planned? Yes No 20. Attachments: Property Plat BOP Sketch Drilling Program Time v. Depth Plot Shallow Hazard Analysis Diverter Sketch Seabed Report Drilling Fluid Program 20 AAC 25.050 requirements Contact Name: Contact Email: Contact Phone: Date: Permit to Drill API Number: Permit Approval Number: 50-029-22003-Date: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Samples req'd: Yes No Mud log req'd: Yes No H2S measures: Yes No Directional svy req'd: Yes No Spacing exception req'd: Yes No Inclination-only svy req'd: Yes No Post initial injection MIT req'd: Yes No APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: Sr Pet Eng Sr Pet Geo Sr Res Eng May 1, 2021 Authorized Name: Monty Myers Authorized Title: Drilling Manager Sean McLaughlin sean.mclaughlin@hilcorp.com 18. Casing Program: Top - Setting Depth - BottomSpecifications 4033 MPU L-06A Milne Point Field Kuparuk Oil Pool 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 Hilcorp Alaska, LLC 2119' FNL, 318' FWL, Sec. 08, T13N, R10E, UM, AK ADL 025509 & 047434 022224484 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 3333 2127' FSL, 926' FWL, Sec. 04, T13N, R10E, UM, AK 1522' FSL, 600' FWL, Sec. 04, T13N, R10E, UM, AK 88-002 5093 10,830' Cement Quantity, c.f. or sacks Cement Volume MDSize Plugs (measured): (including stage data) Effect. Depth TVD (ft): 10,390' Effect. Depth MD (ft): 6,901'11,091'7,313' LengthCasing 10,390' Total Depth MD (ft): Total Depth TVD (ft): Liner Intermediate 11,068'7" Surface Conductor/Structural 13-3/8"80' 6,314'6,314' 11068' 9-5/8" Authorized Signature: 65 Bbls Class 'G'Production See cover letter for other requirements.01-00 Perforation Depth MD (ft): 21. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Commission Use Only Perforation Depth TVD (ft): GL / BF Elevation above MSL (ft): 316 Bbls PF 'E', 67 Bbls Class 'G' 485 sx Permafrost 'C' 115' Uncemented Solid / Slotted Liner Form 10-401 Revised 3/2020 This permit is valid for 24 months from the date of approval per 20 AAC 25.005(g) 1.22.2021 By Samantha Carlisle at 10:15 am, Jan 22, 2021 Digitally signed by Monty M Myers DN: cn=Monty M Myers, c=US, o=Hilcorp Alaska, LLC, ou=Technical Services - AK Drilling, email=mmyers@hilcorp.com Reason: I am approving this document Date: 2021.01.22 08:51:48 -09'00' Monty M Myers X Concur. DLB DSR-1/22/21 Variance to 20 AAC 25.112(i) : Alternate plug placement approved. BOPE test to 3500 psi. DLB 01/26/2021 3333 X X MGR26JAN2021 X 221-011 X X X R26J6666666666666AN2021 1/27/21 1/27/21 To: Alaska Oil & Gas Conservation Commission From: Sean McLaughlin Drilling Engineer Date: January 21, 2021 Re: MPU L-06A Permit to Drill Request Approval is requested for drilling a CTD sidetrack lateral from well MPU L-06 with the Nabors CDR2 Coiled Tubing Drilling rig on or around May 2021. Proposed plan for MPU L-06A Producer: Prior to drilling activities the wellbore will be prepared for a sidetrack (see L-06 Sundry request). The 2-7/8” kill string will be pulled, cement milled to 10,600’, and a 4-1/2” production string run. An E-line unit will set a CTD whipstock in the Kuparuk interval at 10562’. CDR2 will mill a 3.80” window through 7” casing and into the C1/B6 sand. A lateral with be drilled into a neighbouring fault block to 11,809’. This lateral will be completed with a 2-7/8” solid/slotted liner brought back to the tubing. A liner top packer will help ensure production from the new fault block. The following describes the work planned. A wellbore schematic of the current well and proposed sidetrack is attached for reference. Pre-Rig Work: 1. Reference MPU L-06 Sundry submitted in concert with this PTD request 2. General work scope of Pre-Rig work: a. Rig: Pull kill string b. Rig: Mill cement and retainer to 10600’ c. Rig: Run 4-1/2” production string d. E-line: Set 4-1/2” x 7” whipstock at 10562, 15 deg ROHS Rig Work: 3. MIRU and test BOPE to 3500 psi. MASP with gas (0.10 psi/ft) to surface is 3333 psi a. Give AOGCC 24hr notice prior to BOPE test b. Test against swab and master valves (No TWC) c. Load pits with 9.3 ppg mud d. Open well and ensure zero pressure 4. Mill 3.80” single string window plus 10’ of rathole. a. TOWS at 10562’, 15 ROHS. b. Mill window with straight motor c. Pressure deployment is required for the window milling run i. SBHPS 04/10/12 4,033 psi at 7,001’ TVD (11.1 ppg EMW) 5. Drill and complete the sidetrack a. 3.0” BHA with GR/RES b. Drill with bicenter bit (4.25”) i. Target constant bottom hole pressure of 11.8 ppg for entire sidetrack ii. Pressure deployment will be required c. 40 deg build section – 463’ d. 12 deg lateral section - 784’ e. Planned fault crossing at 11320’. i. Transition from an 11.1 ppg to 8.5 ppg reservoir. f. Planned TD 11,809’ g. After TD and on the last trip out of hole lay in KWF in preparation for liner run h. No flow test prior to laying down drilling BHA i. Run 2-7/8” solid/slotted liner with liner top placed in the tubing tail PTD 221-011 Sundry 321-042 i. Soild liner run to 200’ past fault location/Slotted to TD ii. Have 2-3/8” safety joint with TIW valve ready to be picked up while running liner iii. Liner may be run in two sections if weight transfer or hole conditions is poor j. After releasing from the liner swap the well over to 2% KCl i. Expect 985 psi on the wellhead after the fluid swap. k. Freeze protect well from 2000’ Post Rig: 1. V: Tree work as necessary 2. S: Install LTP Managed Pressure Drilling: The history of CTD at KRU in the Kuparuk reservoir, has demonstrated the benefits of a managed pressure drilling technique. Due to uncertainties about the bottom hole pressures to be encountered as this sidetrack is drilled, managed pressure drilling techniques will be employed on this well. The intent is to provide constant bottom hole pressure by using 9.3 ppg drilling fluid in combination with annular friction losses and applied surface pressure. Constant BHP will be utilized to reduce pressure fluctuations to help with hole stability. Applying annular friction and choke pressure also allow use of lighter drilling fluid and minimizes fluid losses and/or fracturing at the end of the long well bores. A MPD choke for regulating surface pressure is located between the WC choke manifold and the mud pits and will be independent of the WC choke. Deployment of the BHA under trapped wellhead pressure will be necessary. Pressure deployment of the BHA will be accomplished utilizing 3” pipe/slip rams (see attached BOP configurations). The annular preventer will act as a secondary containment during deployment and not as a stripper. Operating parameters and fluid densities will be adjusted based on real-time bottom hole pressure measurements while drilling and shale behavior. The following scenario is expected for MPL-06A: x Latest reservoir pressure in the parent well: 4033 psi (11.1 ppg) MPD Pressure at the MPU L-06 Planned Window (10562’ MD - 7001’ TVD) Pumps On Pumps Off A Target BHP at Window (ppg) 4,296 psi 4,296 psi 11.8 B Annular friction - ECD (psi/ft) 634 psi 0 psi 0.06 C Mud Hydrostatic (ppg) 3,386 psi 3,386 psi 9.3 B+C 4,019 psi 3,386 psi (no choke pressure) A-(B+C) Choke Pressure Required to Maintain 276 psi 910 psi Target BHP at window and deeper with CTD MPD technique. DLB Note: BHP's will be monitored Operation Details: Reservoir Pressure: x The maximum reservoir pressure for L-06A is expected to be 4033 psi at 7001’ TVD (11.1 ppg equivalent). x Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 3333 psi. Mud Program: x Drilling: Minimum MW of 9.3 ppg KCL with Geovis for drilling. Managed pressure used to maintain constant BHP. x KWF will be stored on location. The tankage will contain 1.5 wellbore volumes of KWF (11.3 ppg expected) to exceed the maximum possible BHP to be encountered as the lateral is drilled. Adjust with real time BHP monitoring. x Completion: A minimum MW 11.3 ppg KWF to be used for liner deployment. Disposal: x All cuttings & mud generated during drilling operations will be hauled to the Milne Point “B” pad G&I facility. Hole Size: x 4.25”bicenter hole for entirety of the sidetrack. Liner Program: x L-06A: 2-7/8”, 6.5#, L-80 solid liner: 10420’ MD – 11520’ MD x L-06A: 2-7/8”, 6.5#, L-80 slotted liner: 11520’ MD – 11808’ MD (from 200’ past fault to TD) x No Cement. A liner top packer will be run post rig to facilitate production from the new fault block. Well Control: x 1.5 wellbore volumes of KWF will be on location at all times during drilling operations. x 4 Ram BOP diagram is attached. MPD and pressure deployment is planned. x Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. x The annular preventer will be tested to 250 psi and 3,500 psi. x An X-over shall be made up to a 2-3/8” safety joint including a TIW valve for all tubulars ran in hole. o Exemption request to 20 AAC 25.036 - Liner rams in the BOPE. A 2-3/8” safety joint will be utilized while running 2-7/8” slotted liner. The desire is to keep the same standing orders for the entire liner run and not change shut in techniques (run safety joint with pre-installed TIW valve). When closing on a 2-3/8” safety joint 2 sets of rams will be available, above and below the flow cross providing better well control options. Directional: x Directional plan attached. Maximum planned hole angle is 87° x Inclination at kick off point is 56°. x Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. x Distance to nearest property line –10830’ x Distance to nearest well within pool – 1730’ (C-17) Logging: x MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. x Real time bore pressure to aid in MPD and ECD management. Perforating: x No perforating, slotted liner. Anti-Collision Failures: x No failures for L-06A Hazards: x MPU L-pad is considered a high H2S pad. The highest recorded H2S well on the pad was from MPU L-32 (410 ppm) in 2009. The maximum recorded value on L-06 is 3 ppm (12/17/2009). Drilling L-06A into a new fault block has a low H2S risk. x Fault crossing. Potential to go from an 11.1 ppg EMW to 8.5 ppg EWM. Use mud viscosity to mitigate differential sticking and losses. x Medium lost circulation risk. Sean McLaughlin CC: Well File CTD Engineer Joseph Lastufka 907-223-6784 _____________________________________________________________________________________ Revised By: TDF 1/6/2021 SCHEMATIC Milne Point Unit Well: MPU L-06 Last Completed: 5/21/2012 PTD: 190-010 TD = 11,091’ (MD) / TD = 7,313’(TVD) Halliburton HOS Cementer @ 1,881’ Orig. KB Elev. = 35’ Ground Elev. = 21’ RKB-THF: 23.95’ (Doyon 16)- 7” Est. TOC @ 8,820’ 9-5/85”88 Cast iron cement retainer set @ 10,400’ w/24 bbls cements below and 10 bbls cement above Top of Cement @ 10,390’ tagged 3/29/2020 Di esel Est. TOC @ 2,000’ PBTD = 10,983’(MD) / PBTD = 7,248’(TVD) KUP A Sands Arctic Pack RA Tag @ 10,304’ 2 1 11.5 ppg brine ` CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8"Conductor48#/ H-40 / Weld 12.715 Surface 115'0.157 9-5/8"Surface 36#/ J-55 / BTC 8.921 Surface 6,314’0.0773 7"Production 26#/ L-80 /BTC 6.276 Surface 11,068’0.0383 TUBING DETAIL 2-7/8"Killstring 6.5#/ L-80 /EUE 8rd 2.441 Surface 10,031’0.0058 JEWELRY DETAIL No Depth Item 1 23.95’4-1/2” Hanger 2 10,054’2-7/8” Mule Shoe –Min ID=2.441” PERFORATION DETAIL KUP Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status KUP C1/B6 10,566’10,593’ 7,001’7,016’27 11/21/1990 Closed KUP B6 10,632’10,662’ 7,039’7,056 30 11/20/1990 Closed KUP B6 10,678’10,693’ 7,065’7,074’15 11/20/1990 Closed KUP B6 10,714’10,724’7,086’7,092’10 11/20/1990 Closed KUP A3 10,800’10,821’ 7,137’7,150’21 11/20/1990 Closed KUP A2 10,834’10,878’ 7,158’7,184’44 11/20/1990 Closed KUP A1 10,900’10,904’ 7,197’7,200’4 11/20/1990 Closed OPEN HOLE / CEMENT DETAIL 13-3/8"485 sks Permafrost “C”in 30” Hole 9-5/8"316 bbl Permafrost E,67 bbl Class ‘G’in 12-1/4” Hole 7”65 bbl Class “G”in 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 700’ Max Hole Angle = 57° @ 4,600’ Max Hole Angle through perforations = 55° TREE & WELLHEAD Tree 2-9/16”5M WKM Wellhead 11”5M WKM,4-1/2” CIW BPV profile , 4-1/2” IBT Lift Threads x 4-1/2” Vam Top Hanging Threads GENERAL WELL INFO API: 50-029-22003-00-00 Drilled and Completed by Pool Rig 102 -11/27/1990 ESP RWO by Rig 4 –9/25/1993 ESP RWO by Nabors 4ES –11/21/1998 ESP RWO by Nabors 4ES –4/9/2001 ESP RWO by Nabors 4ES –6/17/2005 ESP RWO by Nabors 4ES-7/9/2007 ESP RWO by Nabors 3S-11/28/2008 Pull ESP, set CIBP, Run Killstring by Doyon 16 -5/21/2012 _____________________________________________________________________________________ Revised By: IAT 1/13/2021 PROPOSED Post Sundry w/ whipstock Milne Point Unit Well: MPU L-06 Last Completed: 5/21/2012 PTD: 190-010 TD =11,091’ (MD) /TD = 7,313’(TVD) Halliburton HOS Cementer at 1,881’ Orig. KB Elev. = 35’ Ground Elev. = 21’ RKB-THF: 23.95’ (Doyon 16) 7” 3 5 7 Est. TOC at 8,820’ 9-5/8” TOC at ±10,600’ Est. TOC at 2,000’ 6 PBTD =10,983’(MD) / PBTD = 7,248’(TVD) KUPC/B Sands (squeezed) KUP A Sands (squeezed Arctic Pack RA Tag at 10,304’ Top of Whipstock @10,562’ 4 2 1 ` CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8" Conductor 48# / H-40 / Weld 12.715 Surface 115' 0.157 9-5/8" Surface 36# / J-55 / BTC 8.921 Surface 6,314’ 0.0773 7" Production 26# / L-80 / BTC 6.276 Surface 11,068’ 0.0383 TUBING DETAIL 4-1/2” Tubing 12.6# / L-80 / TXPM 3.958 Surface ±10,462’ 0.0058 JEWELRY DETAIL No Depth Item 1 ±24’ 4-1/2” Tubing Hanger 2 ±10,269’ Gauge Carrier 3 ±10,279’ Sliding Sleeve 4 ±10,289’ Ported Pressure Sub 5 ±10,347’ Retrievable Packer 6 ±10,409’ Nipple, 3.813” X 7 ±10,461’ WELG, bottom at ±10,462’ PERFORATION DETAIL KUP Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status KUP C1/B6 10,566’ 10,593’ 7,001’ 7,016’ 27 11/21/1990 Closed KUP B6 10,632’ 10,662’ 7,039’ 7,056 30 11/20/1990 Closed KUP B6 10,678’ 10,693’ 7,065’ 7,074’ 15 11/20/1990 Closed KUP B6 10,714’ 10,724’ 7,086’ 7,092’ 10 11/20/1990 Closed KUP A3 10,800’ 10,821’ 7,137’ 7,150’ 21 11/20/1990 Closed KUP A2 10,834’ 10,878’ 7,158’ 7,184’ 44 11/20/1990 Closed KUP A1 10,900’ 10,904’ 7,197’ 7,200’ 4 11/20/1990 Closed OPEN HOLE / CEMENT DETAIL 13-3/8" 485 sks Permafrost “C”in 30” Hole 9-5/8" 316 bbl Permafrost E, 67 bbl Class ‘G’ in 12-1/4” Hole 7” 65 bbl Class “G” in 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 700’ Max Hole Angle = 57° @ 4,600’ Max Hole Angle through perforations = 55° TREE & WELLHEAD Tree 2-9/16” 5M WKM (dry hole) Wellhead 11” 5M WKM, 4-1/2” CIW BPV profile , 4-1/2” IBT Lift Threads x 4-1/2” Vam Top Hanging Threads GENERAL WELL INFO API: 50-029-22003-00-00 Drilled and Completed by Pool Rig 102 - 11/27/1990 ESP RWO by Rig 4 – 9/25/1993 ESP RWO by Nabors 4ES – 11/21/1998 ESP RWO by Nabors 4ES – 4/9/2001 ESP RWO by Nabors 4ES – 6/17/2005 ESP RWO by Nabors 4ES- 7/9/2007 ESP RWO by Nabors 3S- 11/28/2008 Pull ESP, set CIBP, Run Killstring by Doyon 16 - 5/21/2012 _____________________________________________________________________________________ Revised By: JNL 1/20/2021 PROPOSED Milne Point Unit Well: MPU L-06A Last Completed: TBD PTD: TBD TD =11,808’ (MD) /TD =7,411’(TVD) Halliburton HOS Cementer at 1,881’ Orig. KB Elev. = 56.0’ Ground Elev. = 17.0’ RKB-THF: 23.95’ (Doyon 16) 7” 3 5 7 2-7/8” Est. TOC at 8,820’ 9-5/8” Est. TOC at 2,000’ 6 PBTD = 11,808’(MD) / PBTD=7,411’(TVD) Top of Liner @10,420’ XO solid to Slotted @ ~11525’ Arctic Pack Top of Window @10,567’ 4 2 1 ` CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8" Conductor 48# / H-40 / Weld 12.715 Surface 115' 0.157 9-5/8" Surface 36# / J-55 / BTC 8.921 Surface 6,314’ 0.0773 7" Production 26# / L-80 / BTC 6.276 Surface 11,068’ 0.0383 2-7/8” Solid/Slotted Liner 6.5 / L-80 / STL 10,420’ 11,809’ TUBING DETAIL 4-1/2” Tubing 12.6# / L-80 / TXPM 3.958 Surface ±10,462’ 0.0058 JEWELRY DETAIL No Depth Item 1 ±24’ 4-1/2” Tubing Hanger 2 ±10,269’ Gauge Carrier 3 ±10,279’ Sliding Sleeve 4 ±10,289’ Ported Pressure Sub 5 ±10,347’ Retrievable Packer 6 ±10,409’ Nipple, 3.813” X 7 ±10,461’ WELG, bottom at ±10,462’ SLOTTED LINER DETAIL KUP Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status OPEN HOLE / CEMENT DETAIL 30" 485 sks Permafrost “C” 12-1/4" 316 bbl Permafrost E, 67 bbl Class ‘G’ 8-1/2” 65 bbl Class “G” 4-1/4” Uncemented Solid / Slotted Liner WELL INCLINATION DETAIL KOP @ 700’ Max Hole Angle = 57° @ 4,600’ Max Hole Angle through perforations = 55° A Top of Window @10,567 TREE & WELLHEAD Tree 2-9/16” 5M WKM (dry hole) Wellhead 11” 5M WKM, 4-1/2” CIW BPV profile , 4-1/2” IBT Lift Threads x 4-1/2” Vam Top Hanging Threads GENERAL WELL INFO API: 50-029-22003-00-00 Drilled and Completed by Pool Rig 102 - 11/27/1990 Pull ESP, set CIBP, Run Killstring by Doyon 16 - 5/21/2012 RWO Tubing Swap: TBD A Sidetrack: TBD 7" to 11,091' 22 January, 2021 Plan: MPU L-06A wp03 Milne Point M Pt L Pad MPL-06 MPU L-06A Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt L Pad Standard Proposal Report Well: Wellbore: MPL-06 MPU L-06A Survey Calculation Method:Minimum Curvature MPL-06 Ref Elevation @ 56.00usft Design:MPU L-06A wp03 Database:NORTH US + CANADA MD Reference:MPL-06 Ref Elevation @ 56.00usft North Reference: Well MPL-06 True Map System: Geo Datum: Project Map Zone: System Datum:US State Plane 1927 (Exact solution) NAD 1927 (NADCON CONUS) Milne Point, ACT, MILNE POINT Alaska Zone 04 Mean Sea Level Using Well Reference Point Using geodetic scale factor Site Position: From: Site Latitude: Longitude: Position Uncertainty: Northing: Easting: Grid Convergence: M Pt L Pad, TR-13-10 usft Map usft usft °0.34Slot Radius:"0 6,029,799.280 544,529.550 0.00 70° 29' 32.230 N 149° 38' 9.412 W Well Well Position Longitude: Latitude: Easting: Northing: usft +E/-W +N/-S Position Uncertainty usft usft usftGround Level: MPL-06, MPL-06 usft usft 0.00 0.00 6,031,350.910 544,919.970 17.00Wellhead Elevation:usft0.00 70° 29' 47.468 N 149° 37' 57.645 W Wellbore Declination (°) Field Strength (nT) Sample Date Dip Angle (°) MPU L-06A Model NameMagnetics BGGM2020 1/21/2021 15.75 80.87 57,362.76064208 Phase:Version: Audit Notes: Design MPU L-06A wp03 PLAN Vertical Section: Depth From (TVD) (usft) +N/-S (usft) Direction (°) +E/-W (usft) Tie On Depth:10,567.00 56.720.000.0039.00 Inclination (°) Azimuth (°) +E/-W (usft) Tool Face (°) +N/-S (usft) Measured Depth (usft) Vertical Depth (usft) Dogleg Rate (°/100usft) Build Rate (°/100usft) Turn Rate (°/100usft) Plan Sections TVD System usft 0.000.000.000.005,873.804,248.537,001.5555.4155.4110,567.00 6,945.55 30.005.377.829.005,887.574,257.837,012.6856.4956.9810,587.00 6,956.68 25.0016.5536.9540.005,943.314,286.787,036.2967.6982.0010,654.72 6,980.29 104.0040.381.5840.006,111.744,088.947,109.81210.0087.5511,007.18 7,053.81 135.009.03-8.2112.005,954.283,906.677,165.20232.5867.0311,257.18 7,109.20 90.0012.960.7912.005,832.183,842.687,222.77252.0268.2211,407.18 7,166.77 -90.00-12.830.8612.005,690.853,763.477,286.27229.5669.7311,582.18 7,230.27 180.000.00-12.0012.005,549.243,642.787,411.00229.5642.6011,808.29 7,355.00 1/22/2021 12:23:01AM COMPASS 5000.15 Build 91E Page 2 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt L Pad Standard Proposal Report Well: Wellbore: MPL-06 MPU L-06A Survey Calculation Method:Minimum Curvature MPL-06 Ref Elevation @ 56.00usft Design:MPU L-06A wp03 Database:NORTH US + CANADA MD Reference:MPL-06 Ref Elevation @ 56.00usft North Reference: Well MPL-06 True Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft) Planned Survey Vertical Depth (usft) TVDss usft DLS -17.00 Vert Section 39.00 0.00 39.00 0.00 0.000.00 544,919.9706,031,350.910-17.00 0.000 0.00 100.00 0.35 100.00 -0.19 0.00181.10 544,919.9686,031,350.72444.00 0.574 -0.11 200.00 0.28 200.00 -0.74 0.01176.58 544,919.9806,031,350.175144.00 0.074 -0.40 300.00 0.30 300.00 -1.23 -0.04193.93 544,919.9346,031,349.676244.00 0.090 -0.71 400.00 0.23 400.00 -1.68 -0.15193.42 544,919.8276,031,349.226344.00 0.070 -1.05 500.00 0.15 500.00 -1.99 -0.26209.32 544,919.7186,031,348.916444.00 0.095 -1.31 600.00 0.13 600.00 -2.17 -0.23122.25 544,919.7516,031,348.742544.00 0.193 -1.38 700.00 2.77 699.96 -0.45 1.5042.70 544,921.4766,031,350.468643.96 2.749 1.01 800.00 4.82 799.73 4.38 6.0243.27 544,925.9656,031,355.330743.73 2.050 7.44 900.00 7.38 899.16 12.18 13.2442.45 544,933.1336,031,363.172843.16 2.561 17.75 1,000.00 9.12 998.12 22.46 23.2445.67 544,943.0746,031,373.509942.12 1.800 31.76 1,100.00 11.95 1,096.42 34.98 36.5647.62 544,956.3166,031,386.1071,040.42 2.852 49.76 1,200.00 13.85 1,193.89 49.93 53.1448.25 544,972.8036,031,401.1551,137.89 1.905 71.82 1,300.00 15.85 1,290.55 66.76 72.4649.55 544,992.0226,031,418.1011,234.55 2.027 97.21 1,400.00 20.53 1,385.53 86.65 96.5151.07 545,015.9456,031,438.1341,329.53 4.704 128.23 1,500.00 20.78 1,479.10 108.54 124.1752.22 545,043.4716,031,460.1841,423.10 0.476 163.37 1,600.00 21.67 1,572.32 130.72 152.7852.20 545,071.9436,031,482.5391,516.32 0.890 199.46 1,700.00 25.33 1,664.01 155.73 183.8250.22 545,102.8286,031,507.7361,608.01 3.744 239.13 1,800.00 26.62 1,753.90 183.62 217.5950.67 545,136.4266,031,535.8241,697.90 1.305 282.67 1,900.00 27.97 1,842.77 212.63 253.1050.83 545,171.7586,031,565.0471,786.77 1.352 328.27 2,000.00 30.37 1,930.08 243.59 290.7550.33 545,209.2116,031,596.2251,874.08 2.412 376.73 2,100.00 35.10 2,014.17 278.04 332.4150.48 545,250.6586,031,630.9251,958.17 4.731 430.46 2,200.00 37.18 2,094.93 315.07 378.3051.70 545,296.3256,031,668.2252,038.93 2.201 489.15 2,300.00 39.80 2,173.19 353.55 427.2151.90 545,344.9946,031,706.9982,117.19 2.623 551.15 2,400.00 42.10 2,248.72 393.87 478.8752.15 545,396.4076,031,747.6282,192.72 2.306 616.47 2,500.00 44.90 2,321.25 436.61 532.8251.10 545,450.0906,031,790.6902,265.25 2.892 685.02 2,600.00 47.12 2,390.70 482.02 588.6250.63 545,505.6086,031,836.4322,334.70 2.246 756.59 2,700.00 49.17 2,457.42 529.19 646.2550.77 545,562.9526,031,883.9482,401.42 2.053 830.66 2,800.00 51.27 2,521.40 577.58 705.9651.18 545,622.3556,031,932.6862,465.40 2.123 907.12 2,900.00 53.67 2,582.31 627.19 767.8151.35 545,683.9056,031,982.6712,526.31 2.404 986.06 3,000.00 53.32 2,641.80 676.96 830.9452.15 545,746.7206,032,032.8102,585.80 0.732 1,066.13 3,100.00 52.53 2,702.09 725.53 894.2352.85 545,809.7146,032,081.7582,646.09 0.967 1,145.70 3,200.00 52.30 2,763.08 772.90 957.7653.73 545,872.9476,032,129.5062,707.08 0.734 1,224.80 3,300.00 53.20 2,823.61 819.54 1,022.2654.52 545,937.1586,032,176.5342,767.61 1.098 1,304.32 3,400.00 53.27 2,883.46 865.56 1,087.8355.35 546,002.4416,032,222.9472,827.46 0.669 1,384.39 3,500.00 53.80 2,942.90 910.87 1,154.2756.07 546,068.6046,032,268.6492,886.90 0.785 1,464.80 3,600.00 53.47 3,002.19 955.58 1,221.2456.47 546,135.2956,032,313.7632,946.19 0.461 1,545.32 3,700.00 53.60 3,061.63 1,000.91 1,287.6754.92 546,201.4426,032,359.4843,005.63 1.253 1,625.73 3,800.00 53.45 3,121.07 1,046.86 1,353.6655.38 546,267.1466,032,405.8273,065.07 0.399 1,706.11 3,900.00 54.43 3,179.94 1,092.56 1,420.3455.77 546,333.5456,032,451.9233,123.94 1.029 1,786.93 4,000.00 54.50 3,238.06 1,139.68 1,486.6753.45 546,399.5846,032,499.4423,182.06 1.889 1,868.24 4,100.00 55.28 3,295.58 1,188.90 1,552.0152.57 546,464.6176,032,549.0523,239.58 1.061 1,949.87 4,200.00 55.27 3,352.54 1,238.50 1,617.5553.20 546,529.8496,032,599.0373,296.54 0.518 2,031.88 4,300.00 55.45 3,409.38 1,287.30 1,683.7854.03 546,595.7816,032,648.2363,353.38 0.706 2,114.03 4,400.00 56.08 3,465.64 1,335.57 1,750.9154.53 546,662.6026,032,696.9013,409.64 0.754 2,196.63 1/22/2021 12:23:01AM COMPASS 5000.15 Build 91E Page 3 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt L Pad Standard Proposal Report Well: Wellbore: MPL-06 MPU L-06A Survey Calculation Method:Minimum Curvature MPL-06 Ref Elevation @ 56.00usft Design:MPU L-06A wp03 Database:NORTH US + CANADA MD Reference:MPL-06 Ref Elevation @ 56.00usft North Reference: Well MPL-06 True Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft) Planned Survey Vertical Depth (usft) TVDss usft DLS 3,464.57 Vert Section 4,500.00 57.28 3,520.57 1,383.89 1,819.0754.80 546,730.4706,032,745.6343,464.57 1.221 2,280.14 4,590.00 57.46 3,569.10 1,427.22 1,881.2755.48 546,792.3936,032,789.3293,513.10 0.663 2,355.90 9 5/8" 4,600.00 57.48 3,574.48 1,431.99 1,888.2155.55 546,799.3136,032,794.1443,518.48 0.663 2,364.33 4,700.00 53.23 3,631.32 1,477.89 1,956.4656.63 546,867.2756,032,840.4533,575.32 4.342 2,446.57 4,800.00 52.55 3,691.65 1,521.56 2,023.1956.97 546,933.7336,032,884.5193,635.65 0.732 2,526.32 4,900.00 52.47 3,752.51 1,564.53 2,089.8957.45 547,000.1686,032,927.8873,696.51 0.389 2,605.66 5,000.00 52.32 3,813.54 1,606.76 2,156.9258.13 547,066.9356,032,970.5163,757.54 0.559 2,684.87 5,100.00 51.62 3,875.14 1,647.83 2,224.1459.02 547,133.8916,033,011.9873,819.14 0.991 2,763.60 5,200.00 52.72 3,936.48 1,688.69 2,291.7358.67 547,201.2266,033,053.2543,880.48 1.134 2,842.53 5,300.00 51.70 3,997.75 1,729.27 2,359.5459.55 547,268.7856,033,094.2333,941.75 1.234 2,921.48 5,400.00 54.82 4,057.59 1,772.84 2,426.7354.63 547,335.7096,033,138.2044,001.59 5.026 3,001.56 5,500.00 55.70 4,114.57 1,820.89 2,493.3953.80 547,402.0696,033,186.6544,058.57 1.113 3,083.66 5,600.00 54.18 4,172.01 1,868.92 2,559.6754.35 547,468.0516,033,235.0764,116.01 1.585 3,165.42 5,700.00 55.07 4,229.91 1,916.48 2,625.8954.27 547,533.9796,033,283.0404,173.91 0.892 3,246.89 5,800.00 55.30 4,287.00 1,964.32 2,692.6254.45 547,600.4056,033,331.2764,231.00 0.273 3,328.92 5,900.00 54.65 4,344.39 2,011.35 2,759.6555.45 547,667.1496,033,378.7064,288.39 1.046 3,410.77 6,000.00 53.75 4,402.89 2,056.93 2,826.7456.18 547,733.9566,033,424.6784,346.89 1.077 3,491.86 6,100.00 52.88 4,462.63 2,101.19 2,893.6156.82 547,800.5506,033,469.3404,406.63 1.010 3,572.05 6,200.00 53.42 4,522.60 2,144.95 2,960.6156.88 547,867.2746,033,513.4984,466.60 0.542 3,652.07 6,300.00 54.20 4,581.65 2,189.17 3,028.1256.67 547,934.5116,033,558.1224,525.65 0.798 3,732.78 6,400.00 54.68 4,639.80 2,233.94 3,096.0456.55 548,002.1566,033,603.2974,583.80 0.490 3,814.13 6,500.00 55.10 4,697.32 2,279.00 3,164.3256.60 548,070.1516,033,648.7664,641.32 0.422 3,895.93 6,600.00 55.28 4,754.40 2,324.29 3,232.8056.45 548,138.3556,033,694.4624,698.40 0.218 3,978.04 6,700.00 55.75 4,811.02 2,369.93 3,301.4456.30 548,206.7066,033,740.5164,755.02 0.486 4,060.46 6,800.00 55.60 4,867.41 2,415.96 3,370.0155.95 548,274.9876,033,786.9564,811.41 0.326 4,143.04 6,900.00 54.13 4,924.96 2,461.86 3,437.6955.77 548,342.3876,033,833.2544,868.96 1.477 4,224.81 7,000.00 54.58 4,983.24 2,507.64 3,504.8355.65 548,409.2436,033,879.4374,927.24 0.460 4,306.06 7,100.00 55.17 5,040.77 2,553.80 3,572.3555.63 548,476.4746,033,926.0014,984.77 0.590 4,387.84 7,200.00 55.77 5,097.46 2,600.37 3,640.3055.52 548,544.1396,033,972.9805,041.46 0.607 4,470.20 7,299.00 56.27 5,152.78 2,646.88 3,707.9655.47 548,611.5046,034,019.8895,096.78 0.512 4,552.28 7" 7,300.00 56.28 5,153.34 2,647.35 3,708.6455.47 548,612.1866,034,020.3645,097.34 0.512 4,553.11 7,400.00 54.68 5,210.01 2,694.22 3,776.4055.18 548,679.6536,034,067.6405,154.01 1.618 4,635.48 7,500.00 55.23 5,267.43 2,741.02 3,843.5855.10 548,746.5416,034,114.8355,211.43 0.554 4,717.32 7,600.00 55.87 5,324.00 2,788.19 3,911.2255.12 548,813.8876,034,162.4075,268.00 0.640 4,799.75 7,700.00 56.27 5,379.81 2,835.68 3,979.2655.05 548,881.6296,034,210.3025,323.81 0.404 4,882.69 7,800.00 56.42 5,435.23 2,883.41 4,047.4554.97 548,949.5276,034,258.4415,379.23 0.164 4,965.89 7,900.00 56.55 5,490.45 2,931.31 4,115.6954.90 549,017.4716,034,306.7465,434.45 0.142 5,049.22 8,000.00 56.00 5,545.97 2,979.17 4,183.7154.83 549,085.1916,034,355.0175,489.97 0.553 5,132.35 8,100.00 56.35 5,601.64 3,027.11 4,251.5554.68 549,152.7396,034,403.3615,545.64 0.372 5,215.37 8,200.00 56.68 5,656.81 3,075.43 4,319.5454.52 549,220.4236,034,452.0805,600.81 0.356 5,298.72 8,300.00 56.10 5,712.16 3,124.41 4,386.8953.42 549,287.4706,034,501.4665,656.16 1.084 5,381.90 8,400.00 56.42 5,767.70 3,174.12 4,453.5553.15 549,353.8226,034,551.5775,711.70 0.391 5,464.91 8,500.00 54.77 5,824.21 3,223.60 4,519.5753.15 549,419.5356,034,601.4495,768.21 1.650 5,547.26 1/22/2021 12:23:01AM COMPASS 5000.15 Build 91E Page 4 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt L Pad Standard Proposal Report Well: Wellbore: MPL-06 MPU L-06A Survey Calculation Method:Minimum Curvature MPL-06 Ref Elevation @ 56.00usft Design:MPU L-06A wp03 Database:NORTH US + CANADA MD Reference:MPL-06 Ref Elevation @ 56.00usft North Reference: Well MPL-06 True Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft) Planned Survey Vertical Depth (usft) TVDss usft DLS 5,825.66 Vert Section 8,600.00 55.10 5,881.66 3,272.74 4,585.0353.07 549,484.6936,034,650.9725,825.66 0.336 5,628.94 8,700.00 55.73 5,938.42 3,322.13 4,650.9053.20 549,550.2546,034,700.7555,882.42 0.639 5,711.11 8,800.00 56.12 5,994.45 3,371.70 4,717.2553.27 549,616.3026,034,750.7275,938.45 0.394 5,793.79 8,900.00 56.60 6,049.84 3,421.53 4,783.9553.20 549,682.6876,034,800.9545,993.84 0.484 5,876.89 9,000.00 55.35 6,105.80 3,471.02 4,850.4353.48 549,748.8636,034,850.8356,049.80 1.271 5,959.62 9,100.00 56.00 6,162.19 3,520.17 4,916.7953.47 549,814.9236,034,900.3826,106.19 0.650 6,042.07 9,200.00 56.58 6,217.69 3,569.74 4,983.6053.38 549,881.4206,034,950.3496,161.69 0.585 6,125.12 9,300.00 56.87 6,272.55 3,619.69 5,050.6453.25 549,948.1566,035,000.6956,216.55 0.310 6,208.58 9,400.00 55.83 6,327.96 3,669.42 5,117.4053.38 550,014.6026,035,050.8236,271.96 1.046 6,291.67 9,500.00 54.62 6,385.00 3,718.46 5,183.2953.30 550,080.1896,035,100.2576,329.00 1.212 6,373.67 9,600.00 54.43 6,443.03 3,767.08 5,248.6253.38 550,145.2166,035,149.2706,387.03 0.201 6,454.97 9,700.00 54.82 6,500.93 3,816.92 5,313.1451.25 550,209.4266,035,199.4976,444.93 1.780 6,536.26 9,800.00 55.53 6,558.04 3,868.38 5,377.1051.12 550,273.0706,035,251.3336,502.04 0.718 6,617.96 9,900.00 56.50 6,613.93 3,920.49 5,441.5951.00 550,337.2416,035,303.8316,557.93 0.975 6,700.48 10,000.00 53.95 6,670.96 3,971.89 5,505.6651.53 550,400.9866,035,355.6086,614.96 2.587 6,782.24 10,100.00 53.90 6,729.85 4,022.01 5,569.0751.83 550,464.0886,035,406.1016,673.85 0.248 6,862.75 10,200.00 53.63 6,788.96 4,071.63 5,632.6552.23 550,527.3676,035,456.1066,732.96 0.421 6,943.14 10,300.00 53.72 6,848.19 4,120.62 5,696.6152.87 550,591.0246,035,505.4766,792.19 0.523 7,023.49 10,400.00 54.85 6,906.57 4,169.04 5,761.7853.90 550,655.8956,035,554.2856,850.57 1.406 7,104.54 10,500.00 55.60 6,963.61 4,216.93 5,828.5254.77 550,722.3316,035,602.5706,907.61 1.036 7,186.61 10,567.00 55.41 7,001.55 4,248.53 5,873.8055.41 550,767.4196,035,634.4416,945.55 0.839 7,241.81 KOP : Start Dir 9º/100' : 10567' MD, 7001.55'TVD : 30° RT TF 10,587.00 56.98 7,012.68 4,257.83 5,887.5756.49 550,781.1306,035,643.8276,956.68 9.000 7,258.43 Start Dir 40º/100' : 10587' MD, 7012.68'TVD 10,590.00 58.06 7,014.29 4,259.22 5,889.6957.08 550,783.2396,035,645.2266,958.29 40.000 7,260.96 10,600.00 61.71 7,019.30 4,263.80 5,897.0358.98 550,790.5486,035,649.8466,963.30 40.000 7,269.60 10,610.00 65.39 7,023.76 4,268.29 5,904.7760.75 550,798.2636,035,654.3856,967.76 40.000 7,278.54 10,620.00 69.08 7,027.63 4,272.68 5,912.8862.42 550,806.3446,035,658.8196,971.63 40.000 7,287.72 10,630.00 72.79 7,030.89 4,276.93 5,921.3164.00 550,814.7536,035,663.1276,974.89 40.000 7,297.11 10,640.00 76.51 7,033.54 4,281.04 5,930.0465.53 550,823.4496,035,667.2886,977.54 40.000 7,306.66 10,650.00 80.24 7,035.56 4,284.98 5,939.0067.01 550,832.3896,035,671.2836,979.56 40.000 7,316.32 10,654.72 82.00 7,036.29 4,286.78 5,943.3167.69 550,836.6856,035,673.1066,980.29 40.000 7,320.90 10,660.00 81.49 7,037.04 4,288.67 5,948.1769.76 550,841.5386,035,675.0296,981.04 40.000 7,326.01 10,670.00 80.57 7,038.60 4,291.77 5,957.5573.70 550,850.8966,035,678.1816,982.60 40.000 7,335.55 10,680.00 79.68 7,040.32 4,294.21 5,967.0977.66 550,860.4246,035,680.6756,984.32 40.000 7,344.86 10,690.00 78.85 7,042.18 4,295.97 5,976.7681.64 550,870.0756,035,682.4986,986.18 40.000 7,353.91 10,700.00 78.07 7,044.18 4,297.06 5,986.4985.65 550,879.8036,035,683.6426,988.18 40.000 7,362.64 10,710.00 77.34 7,046.31 4,297.46 5,996.2589.67 550,889.5596,035,684.1006,990.31 40.000 7,371.02 10,720.00 76.68 7,048.56 4,297.17 6,005.9993.72 550,899.2986,035,683.8706,992.56 40.000 7,379.00 10,730.00 76.08 7,050.92 4,296.19 6,015.6697.79 550,908.9706,035,682.9556,994.92 40.000 7,386.55 10,740.00 75.55 7,053.37 4,294.54 6,025.21101.88 550,918.5296,035,681.3576,997.37 40.000 7,393.63 10,750.00 75.09 7,055.91 4,292.21 6,034.59105.99 550,927.9296,035,679.0866,999.91 40.000 7,400.20 10,760.00 74.70 7,058.51 4,289.22 6,043.77110.11 550,937.1236,035,676.1517,002.51 40.000 7,406.23 10,770.00 74.39 7,061.18 4,285.58 6,052.69114.25 550,946.0676,035,672.5687,005.18 40.000 7,411.69 10,780.00 74.15 7,063.89 4,281.31 6,061.32118.40 550,954.7176,035,668.3547,007.89 40.000 7,416.56 1/22/2021 12:23:01AM COMPASS 5000.15 Build 91E Page 5 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt L Pad Standard Proposal Report Well: Wellbore: MPL-06 MPU L-06A Survey Calculation Method:Minimum Curvature MPL-06 Ref Elevation @ 56.00usft Design:MPU L-06A wp03 Database:NORTH US + CANADA MD Reference:MPL-06 Ref Elevation @ 56.00usft North Reference: Well MPL-06 True Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft) Planned Survey Vertical Depth (usft) TVDss usft DLS 7,010.64 Vert Section 10,790.00 74.00 7,066.64 4,276.44 6,069.61122.55 550,963.0316,035,663.5297,010.64 40.000 7,420.81 10,800.00 73.92 7,069.40 4,270.98 6,077.51126.72 550,970.9696,035,658.1167,013.40 40.000 7,424.42 10,810.00 73.93 7,072.17 4,264.96 6,085.00130.88 550,978.4916,035,652.1437,016.17 40.000 7,427.38 10,820.00 74.01 7,074.93 4,258.41 6,092.03135.04 550,985.5626,035,645.6387,018.93 40.000 7,429.66 10,830.00 74.18 7,077.67 4,251.36 6,098.57139.20 550,992.1476,035,638.6337,021.67 40.000 7,431.27 10,840.00 74.42 7,080.38 4,243.86 6,104.59143.34 550,998.2136,035,631.1627,024.38 40.000 7,432.18 10,850.00 74.75 7,083.04 4,235.92 6,110.07147.48 551,003.7316,035,623.2627,027.04 40.000 7,432.40 10,860.00 75.14 7,085.64 4,227.60 6,114.96151.60 551,008.6756,035,614.9707,029.64 40.000 7,431.92 10,870.00 75.61 7,088.16 4,218.93 6,119.25155.71 551,013.0206,035,606.3287,032.16 40.000 7,430.76 10,880.00 76.15 7,090.60 4,209.96 6,122.92159.79 551,016.7456,035,597.3787,034.60 40.000 7,428.90 10,890.00 76.76 7,092.95 4,200.72 6,125.96163.86 551,019.8326,035,588.1627,036.95 40.000 7,426.37 10,900.00 77.44 7,095.18 4,191.27 6,128.33167.90 551,022.2656,035,578.7267,039.18 40.000 7,423.17 10,910.00 78.17 7,097.29 4,181.65 6,130.04171.93 551,024.0346,035,569.1177,041.29 40.000 7,419.32 10,920.00 78.96 7,099.28 4,171.91 6,131.08175.93 551,025.1296,035,559.3807,043.28 40.000 7,414.84 10,930.00 79.80 7,101.12 4,162.09 6,131.44179.91 551,025.5456,035,549.5637,045.12 40.000 7,409.74 10,940.00 80.69 7,102.82 4,152.24 6,131.11183.86 551,025.2806,035,539.7157,046.82 40.000 7,404.07 10,950.00 81.62 7,104.35 4,142.41 6,130.11187.80 551,024.3356,035,529.8827,048.35 40.000 7,397.84 10,960.00 82.59 7,105.73 4,132.65 6,128.43191.72 551,022.7156,035,520.1137,049.73 40.000 7,391.08 10,970.00 83.60 7,106.93 4,123.01 6,126.08195.62 551,020.4286,035,510.4567,050.93 40.000 7,383.82 10,980.00 84.63 7,107.96 4,113.53 6,123.08199.50 551,017.4846,035,500.9577,051.96 40.000 7,376.11 10,990.00 85.69 7,108.80 4,104.25 6,119.44203.37 551,013.9006,035,491.6637,052.80 40.000 7,367.98 11,000.00 86.77 7,109.46 4,095.23 6,115.18207.23 551,009.6906,035,482.6207,053.46 40.000 7,359.46 11,007.18 87.55 7,109.81 4,088.94 6,111.74210.00 551,006.2946,035,476.3057,053.81 39.998 7,353.14 Start Dir 12º/100' : 11007.18' MD, 7109.81'TVD 11,025.00 86.04 7,110.81 4,073.65 6,102.64211.52 550,997.2896,035,460.9637,054.81 12.000 7,337.14 11,050.00 83.93 7,113.00 4,052.67 6,089.23213.65 550,984.0086,035,439.9027,057.00 12.000 7,314.42 11,075.00 81.82 7,116.10 4,032.28 6,075.10215.80 550,970.0046,035,419.4337,060.10 12.000 7,291.42 11,100.00 79.73 7,120.11 4,012.55 6,060.29217.98 550,955.3146,035,399.6127,064.11 12.000 7,268.21 11,125.00 77.65 7,125.01 3,993.52 6,044.84220.18 550,939.9796,035,380.4937,069.01 12.000 7,244.85 11,150.00 75.58 7,130.80 3,975.25 6,028.79222.42 550,924.0426,035,362.1297,074.80 12.000 7,221.41 11,175.00 73.54 7,137.45 3,957.79 6,012.19224.71 550,907.5466,035,344.5707,081.45 12.000 7,197.95 11,200.00 71.53 7,144.96 3,941.19 5,995.08227.04 550,890.5356,035,327.8647,088.96 12.000 7,174.53 11,225.00 69.54 7,153.29 3,925.48 5,977.50229.42 550,873.0586,035,312.0577,097.29 12.000 7,151.22 11,250.00 67.59 7,162.43 3,910.73 5,959.51231.87 550,855.1606,035,297.1937,106.43 12.000 7,128.08 11,257.18 67.03 7,165.20 3,906.67 5,954.28232.58 550,849.9506,035,293.1047,109.20 12.000 7,121.48 11,275.00 67.05 7,172.15 3,896.96 5,941.05234.90 550,836.7806,035,283.3217,116.15 12.000 7,105.09 11,300.00 67.13 7,181.88 3,884.27 5,921.84238.16 550,817.6536,035,270.5107,125.88 12.000 7,082.07 11,325.00 67.28 7,191.57 3,872.67 5,901.93241.41 550,797.8126,035,258.7957,135.57 12.000 7,059.06 11,350.00 67.49 7,201.19 3,862.21 5,881.36244.65 550,777.3136,035,248.2087,145.19 12.000 7,036.13 11,375.00 67.77 7,210.71 3,852.90 5,860.20247.88 550,756.2126,035,238.7797,154.71 12.000 7,013.33 11,400.00 68.11 7,220.10 3,844.79 5,838.51251.10 550,734.5676,035,230.5337,164.10 12.000 6,990.74 11,407.18 68.22 7,222.77 3,842.68 5,832.18252.02 550,728.2586,035,228.3877,166.77 12.000 6,984.30 11,425.00 68.23 7,229.38 3,837.26 5,816.55249.72 550,712.6596,035,222.8707,173.38 12.000 6,968.25 11,450.00 68.31 7,238.64 3,828.60 5,795.01246.49 550,691.1706,035,214.0807,182.64 12.000 6,945.49 11,475.00 68.45 7,247.85 3,818.73 5,773.97243.26 550,670.1946,035,204.0887,191.85 12.000 6,922.49 1/22/2021 12:23:01AM COMPASS 5000.15 Build 91E Page 6 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt L Pad Standard Proposal Report Well: Wellbore: MPL-06 MPU L-06A Survey Calculation Method:Minimum Curvature MPL-06 Ref Elevation @ 56.00usft Design:MPU L-06A wp03 Database:NORTH US + CANADA MD Reference:MPL-06 Ref Elevation @ 56.00usft North Reference: Well MPL-06 True Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft) Planned Survey Vertical Depth (usft) TVDss usft DLS 7,201.00 Vert Section 11,500.00 68.65 7,257.00 3,807.69 5,753.49240.05 550,649.7886,035,192.9207,201.00 12.000 6,899.31 11,525.00 68.91 7,266.05 3,795.49 5,733.64236.84 550,630.0096,035,180.6087,210.05 12.000 6,876.02 11,550.00 69.23 7,274.98 3,782.18 5,714.46233.65 550,610.9116,035,167.1837,218.98 12.000 6,852.68 11,575.00 69.61 7,283.77 3,767.79 5,696.00230.47 550,592.5466,035,152.6857,227.77 12.000 6,829.36 11,582.18 69.73 7,286.27 3,763.47 5,690.85229.56 550,587.4146,035,148.3287,230.27 12.000 6,822.67 11,600.00 67.59 7,292.75 3,752.70 5,678.21229.56 550,574.8496,035,137.4877,236.75 12.000 6,806.20 11,625.00 64.59 7,302.88 3,737.88 5,660.82229.56 550,557.5486,035,122.5607,246.88 12.000 6,783.53 11,650.00 61.59 7,314.20 3,723.42 5,643.86229.56 550,540.6726,035,108.0017,258.20 12.000 6,761.41 11,675.00 58.59 7,326.66 3,709.36 5,627.36229.56 550,524.2686,035,093.8477,270.66 12.000 6,739.91 11,700.00 55.59 7,340.24 3,695.75 5,611.39229.56 550,508.3806,035,080.1407,284.24 12.000 6,719.09 11,725.00 52.59 7,354.90 3,682.62 5,595.98229.56 550,493.0526,035,066.9157,298.90 12.000 6,699.00 11,750.00 49.59 7,370.60 3,670.00 5,581.18229.56 550,478.3266,035,054.2107,314.60 12.000 6,679.70 11,775.00 46.59 7,387.30 3,657.93 5,567.02229.56 550,464.2426,035,042.0597,331.30 12.000 6,661.25 11,800.00 43.59 7,404.95 3,646.45 5,553.55229.56 550,450.8406,035,030.4957,348.95 12.000 6,643.68 11,808.29 42.60 7,411.00 3,642.78 5,549.24229.56 550,446.5546,035,026.7987,355.00 12.000 6,638.06 Total Depth : 11808.29' MD, 7411' TVD Vertical Depth (usft) Measured Depth (usft) Casing Diameter (") Hole Diameter (")Name Casing Points 2 3/8" x 3 1/4"7,411.0011,808.29 2-3/8 3-1/4 Measured Depth (usft) Vertical Depth (usft) +E/-W (usft) +N/-S (usft) Local Coordinates Comment Plan Annotations 10,567.00 7,001.55 4,248.53 5,873.80 KOP : Start Dir 9º/100' : 10567' MD, 7001.55'TVD : 30° RT TF 10,587.00 7,012.68 4,257.83 5,887.57 Start Dir 40º/100' : 10587' MD, 7012.68'TVD 11,007.18 7,109.81 4,088.94 6,111.74 Start Dir 12º/100' : 11007.18' MD, 7109.81'TVD 11,808.29 7,411.00 3,642.78 5,549.24 Total Depth : 11808.29' MD, 7411' TVD 1/22/2021 12:23:01AM COMPASS 5000.15 Build 91E Page 7 22 January, 2021Milne PointM Pt L PadMPL-06MPU L-06A5002922003MPU L-06A wp03Reference Design: M Pt L Pad - MPL-06 - MPU L-06A - MPU L-06A wp03Closest Approach 3D Proximity Scan on Current Survey Data (Highside Reference)Well Coordinates: 6,031,350.91 N, 544,919.97 E (70° 29' 47.47" N, 149° 37' 57.65" W)Datum Height: MPL-06 Ref Elevation @ 56.00usftScan Range: 10,567.00 to 11,808.29 usft. Measured Depth.Geodetic Scale Factor AppliedVersion: 5000.15 Build: 91EScan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,500.00 usftNO GLOBAL FILTER: Using user defined selection & filtering criteriaScan Type:Scan Type:25.00 Milne PointHilcorp Alaska, LLCAnticollision Report for MPL-06 - MPU L-06A wp03Comparison Well Name - Wellbore Name - Design@MeasuredDepth(usft)MinimumDistance(usft)EllipseSeparation(usft)@MeasuredDepthusftClearanceFactorScan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,500.00 usftSite NameScan Range: 10,567.00 to 11,808.29 usft. Measured Depth. Closest Approach 3D Proximity Scan on Current Survey Data (Highside Reference)Reference Design: M Pt L Pad - MPL-06 - MPU L-06A - MPU L-06A wp03MeasuredDepth(usft)Summary Based on MinimumSeparation WarningM Pt C PadMPC-17 - MPC-17 - MPC-17 1,201.67 10,917.00 923.55 11,461.00 4.32110,917.00Clearance Factor Pass - MPC-17 - MPC-17 - MPC-171,123.83 11,092.00 881.00 11,461.00 4.62811,092.00Ellipse Separation Pass - MPC-17 - MPC-17 - MPC-17 1,117.65 11,166.74 884.73 11,461.00 4.79811,166.74Centre Distance Pass - M Pt L PadMPL-06 - MPL-06 - MPL-06165.16 10,867.00 160.67 10,767.00 36.80710,867.00Clearance Factor Pass - MPL-07 - MPL-07 - MPL-071,636.87 10,567.00 1,367.99 10,100.00 6.08810,567.00Ellipse Separation Pass - MPL-07 - MPL-07 - MPL-071,661.11 10,692.00 1,387.01 10,204.95 6.06010,692.00Clearance Factor Pass - MPL-07 - MPL-07PB1 - MPL-07PB11,636.87 10,567.00 1,367.88 10,100.00 6.08510,567.00Ellipse Separation Pass - MPL-07 - MPL-07PB1 - MPL-07PB11,661.11 10,692.00 1,386.91 10,204.95 6.05810,692.00Clearance Factor Pass - Survey tool programFrom(usft)To(usft)Survey/Plan Survey Tool100.00 10,567.003_Gyro-CT_pre-1998_Csg10,567.00 11,808.29 MPU L-06A wp03 3_MWDEllipse error terms are correlated across survey tool tie-on points.Separation is the actual distance between ellipsoids.Calculated ellipses incorporate surface errors.Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation).Distance Between centres is the straight line distance between wellbore centres.All station coordinates were calculated using the Minimum Curvature method.22 January, 2021- 0:28COMPASSPage 2 of 4 Well Bighole Date Quick Test Sub to Otis -1.1 ft Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular 6.0 ft Top of Annular Element 6.7 ft Bottom Annular 8.0 ft CL Blind/Shears 9.3 ft CL 2-3/8" Pipe/Slips 10.1 ft B1 B2 B3 B4 Choke Line Kill Line CL 3" Pipe/Slips 12.6 ft CL 2-3/8" Pipe/Slips 13.4 ft CL of Top Swab 16.0 ft Swab Test Pump Hose T1 T2 Swab 1 CL of Flow Cross 17.4 ft Master CL of Master 18.8 ft LDS IA OA LDS Ground Level CDR2-AC 4 Ram BOP Schematic 15-Jan-21 CDR2 Rig's Drip Pan 7-1/16" 5k Flange X 7" Otis Box Hydril 7 1/16" Annular 2-3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2-3/8"Pipe/Slips Blind/Shear 7-1/16" 5 Mud Cross 3" Pipe/Slips Revised 2/2015 TRANSMITTAL LETTER CHECKLIST WELL NAME: ______________________________________ PTD: _____________________________________________ ___ Development ___ Service ___ Exploratory ___ Stratigraphic Test ___ Non-Conventional FIELD: ____________________________ POOL: ______________________________________ Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL (If last two digits in API number are between 60-69) The permit is for a new wellbore segment of existing well Permit No. _____________, API No. 50-_______________________. Production should continue to be reported as a function of the original API number stated above. Pilot Hole In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name (_______________________PH) and API number (50-_____________________) from records, data and logs acquired for well (name on permit). Spacing Exception The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. (_____________________________) as Operator assumes the liability of any protest to the spacing exception that may occur. Dry Ditch Sample All dry ditch sample sets submitted to the AOGCC must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non- Conventional Well Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for well ( ) until after ( ) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (________________________) must contact the AOGCC to obtain advance approval of such water well testing program. Well Logging Requirements Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (_______________________________) in the attached application, the following well logs are also required for this well: Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Milne Point X 221-011 X X Kuparuk Oil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dts 1/26/2021JLC 1/27/2021