Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout204-192CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: Operable: PWI MPG-19 (PTD #2041920)-Return to injection Date:Tuesday, December 16, 2025 8:26:04 AM Attachments:image001.png From: Chris Casey - (C) <chris.casey@hilcorp.com> Sent: Tuesday, December 9, 2025 10:59 AM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Taylor Wellman <twellman@hilcorp.com>; Alaska NS - Wells Integrity <AKNSWellsIntegrity@hilcorp.com>; Ryan Thompson <Ryan.Thompson@hilcorp.com> Subject: Operable: PWI MPG-19 (PTD #2041920)-Return to injection Mr. Wallace, PWI MPG-19 (PTD #2041920) was made Not Operable after being shut in for its 4-year MIT-IA due in September 2025. The well is re-classified as OPERABLE, an AOGCC witnessed MIT-IA will be performed once the well is on stable injection. Please respond with any questions. Chris CaseyHilcorp Alaska LLCField Well IntegrityAKI/MPU/WNS chris.casey@hilcorp.com O: (907) 685-1494 C: (907) 242-1021Alt: Steve Soroka Hilcorp North Slope, LLC The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: NOT OPERABLE: PWI MPG-19 (PTD #2041920) Missed 4-year MIT-IA Date:Tuesday, September 30, 2025 3:19:20 PM From: Stephen Soroka <steve.soroka@hilcorp.com> Sent: Tuesday, September 30, 2025 2:09 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Ryan Thompson <Ryan.Thompson@hilcorp.com> Subject: NOT OPERABLE: PWI MPG-19 (PTD #2041920) Missed 4-year MIT-IA Mr. Wallace PWI MPG-19 (PTD # 2041920) is currently shut in and was not brought online for its scheduled 4-year MIT-IA that was due in September. The well is now classified as NOT OPERABLE and will remain shut in. A witnessed MIT-IA will be scheduled once the well is returned to injection. Please respond with any questions. Thank You. Steve Soroka Hilcorp Alaska LLC Field Well Integrity Steve.Soroka@hilcorp.com P: (907) 830-8976 Alt: Chris Casey The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate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´[´%DNHU3UHPLHU ´[´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y Samantha Carlisle at 10:56 am, Jan 25, 2022 322-034 'LJLWDOO\VLJQHGE\'DYLG +DDNLQVRQ  '1FQ 'DYLG+DDNLQVRQ   RX 8VHUV 'DWH  'DYLG+DDNLQVRQ  '650*5-$1  6)'  dts 1/26/2022 JLC 1/26/2022 Jeremy Price Digitally signed by Jeremy Price Date: 2022.01.26 10:53:36 -09'00' RBDMS HEW 1/26/2022 DdƌĞĂƚŵĞŶƚK tĞůů͗DWh'Ͳϭϵ tĞůůEĂŵĞ͗DWh'Ͳϭϵ W/EƵŵďĞƌ͗ϱϬͲϬϮϵͲϮϯϮϮϴͲϬϬ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗tĂƚĞƌ/ŶũĞĐƚŽƌ WĂĚ͗DŝůŶĞWŽŝŶƚ'ͲWĂĚ ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗&Ğď͘ϱƚŚ ZŝŐ͗Eͬ ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛Ě͍zĞƐ ĂƚĞZĞŐ͘ƉƉƌŽǀĂůZĞĐ͛ǀĚ͗ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗dŽŵ&ŽƵƚƐ WĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗ϮϬϰͲϭϵϮ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ĂǀŝĚ'Žƌŵ ;ϵϬϳͿϳϳϳͲϴϯϯϯ;KͿ ;ϱϬϱͿϮϭϱͲϮϴϭϵ;DͿ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗dĂLJůŽƌtĞůůŵĂŶ ;ϵϬϳͿϳϳϳͲϴϰϰϵ;KͿ ;ϵϬϳͿϵϰϳͲϵϱϯϯ;DͿ &XUUHQW%RWWRP+ROH3UHVVXUHSVL#¶79' *UDGLHQW 0D[LPXP([SHFWHG%+3SVL#¶79' SSJ 0363SVL SVLIWJDVJUDGLHQW ƌŝĞĨtĞůů^ƵŵŵĂƌLJ͗ DWh'ͲϭϵǁĂƐĚƌŝůůĞĚŝŶϮϬϬϰĂƐĂĚĞǀŝĂƚĞĚŝŶũĞĐƚŽƌŝŶƚŚĞ^ĐŚƌĂĚĞƌůƵĨĨE͕K͕ĂŶĚKƐĂŶĚƐĂŶĚ ƉƌŽǀŝĚĞƐƐƵƉƉŽƌƚĨŽƌŽĨĨƐĞƚƉƌŽĚƵĐĞƌDWh'Ͳϭϲ;WdϮϬϯͲϮϭϬͿ͘ EŽƚĞƐZĞŐĂƌĚŝŶŐtĞůůďŽƌĞŽŶĚŝƚŝŽŶ x 'ͲϭϵŝƐĂĚĞǀŝĂƚĞĚǁĂƚĞƌŝŶũĞĐƚŽƌ;ŵĂdžŚŽůĞĂŶŐůĞϳϬΣΛϲ͕Ϭϭϲ͛DͿ͘ x >ĂƐƚD/dͲ/ƚŽϭ͕ϱϬϬƉƐŝŽŶϵͬϮϴͬϮϬϮϭ͘ x ŽŶĨŝƌŵĞĚDďĞƚǁĞĞŶDWh'Ͳϭϲ;:WKŝůWƌŽĚƵĐĞƌͿďĂƐĞĚŽŶƌĞĚĚLJĞƚĞƐƚ͘ KďũĞĐƚŝǀĞ͗ dŚĞƉƵƌƉŽƐĞŽĨƚŚŝƐǁŽƌŬͬƐƵŶĚƌLJŝƐƚŽƉƵŵƉĂDƚƌĞĂƚŵĞŶƚĂŶĚƉůĂĐĞǁĞůůďĂĐŬŽŶǁĂƚĞƌŝŶũĞĐƚŝŽŶ͘ WƌĞͲ^ƵŶĚƌLJ^ůŝĐŬůŝŶĞtŽƌŬ͗ ϭ͘ ZhƐůŝĐŬůŝŶĞ͘WdWƚŽϮϱϬƉƐŝŐ>ͬϮ͕ϱϬϬƉƐŝŐ,͘ Ϯ͘ Z/,ǁŝƚŚϮΗďĂŝůĞƌ͕ďĂŝůƚŽĂĐĐĞƐƐ^dηϮƉŽĐŬĞƚĂƚϴ͕ϭϲϱ͛D͘ ϯ͘ Z/,ĂŶĚƐĞƚĂDsŝŶ^dηϮĂƚϴ͕ϭϲϱΖD͘ ϰ͘ Z/,ƉƵůůDsŝŶ^dηϰĂƚϳ͕ϵϴϳΖD͕>ĞĂǀĞWŽĐŬĞƚŵƉƚLJ͘ ϱ͘ Z^> DdƌĞĂƚŵĞŶƚWƵŵƉŝŶŐWƌŽĐĞĚƵƌĞ;^ƵŶĚƌLJZĞƋƵŝƌĞĚͿ͗ ϭ͘ /ŶŝƚŝĂƚĞ/ŶũĞĐƚŝŽŶŽŶ'ͲϭϵĂŶĚŚĂǀĞŽĨĨƐĞƚƉƌŽĚƵĐĞƌ'ͲϭϲŽŶůŝŶĞϰϴŚƌƐ͘ƉƌŝŽƌƚŽƐƚĂƌƚŝŶŐƚƌĞĂƚŵĞŶƚ͘ ;EŽƚĞ͗ƚƚĞŵƉƚŝŶŐƚŽŝŶŝƚŝĂƚĞƚŚĞƉƌĞƐƐƵƌĞĚƌĂǁĚŽǁŶƉĂƚŚƚŽƚŚĞƉƌŽĚƵĐĞƌͿ͘>ĞĂǀĞƚŚĞWƌŽĚƵĐĞƌ'Ͳϭϲ ŽŶůŝŶĞƵŶƚŝůƐƚĂƌƚŝŶŐƚŽƉƵŵƉDdƌĞĂƚŵĞŶƚ͘ Ϯ͘ D/ZhĞŵĞŶƚWƵŵƉŝŶŐhŶŝƚĂŶĚ>ŝƚƚůĞZĞĚWƵŵƉŝŶŐhŶŝƚ͘WdůŝŶĞ ƐƚŽϰ͕ϬϬϬƉƐŝ͘ Ă͘ ^ĞƚƵƉĨůƵŝĚŵĂŶŝĨŽůĚƚŽĂůůŽǁŝŶŐƐǁŝƚĐŚŝŶŐŽǀĞƌĨƌŽŵĞŵĞŶƚhŶŝƚƚŽ>ŝƚƚůĞZĞĚ͘ ϯ͘ WĞƌĨŽƌŵŝŶũĞĐƚŝǀŝƚLJƚĞƐƚǁͬƐŽƵƌĐĞǁĂƚĞƌ͘ Ă͘ ^ŚƵƚŝŶKĨĨƐĞƚƉƌŽĚƵĐĞƌ'Ͳϭϲ͘ ď͘ /ŶũĞĐƚĂƚϭ͘ϬďƉŵŽƌĂŵĂdžϴϱϬƉƐŝĨŽƌŝŶũĞĐƚŝǀŝƚLJƚĞƐƚ͘ DdƌĞĂƚŵĞŶƚK tĞůů͗DWh'Ͳϭϵ ϰ͘ DŝdžĂŶĚďƵůůŚĞĂĚƚŚĞĨŽůůŽǁŝŶŐĨůƵŝĚƐǁŝƚŚƚŚĞĞŵĞŶƚŝŶŐhŶŝƚ͗ Ă͘ нͬͲϱďďůŽĨůĞĂĚƐƉĂĐĞƌƉŝůů͘ ď͘ нͬͲϯďďůŽĨϭϱ͘ϴƉƉŐĂĐŝĚƐŽůƵďůĞĐĞŵĞŶƚ͘ Đ͘ нͬͲϭďďůŽĨƚĂŝůƐƉĂĐĞƌƉŝůů͘ ϱ͘ DŝdžĂŶĚďƵůůŚĞĂĚƚŚĞĨŽůůŽǁŝŶŐĨůƵŝĚƐǁŝƚŚƚŚĞ>ŝƚƚůĞZĞĚWƵŵƉŝŶŐhŶŝƚ͗ Ă͘ нͬͲϰϮ͘ϬďďůŽĨϭй<>ǁĂƚĞƌ͘ ď͘ нͬͲϯϬ͘ϬďďůŽĨĚŝĞƐĞů;ĨƌĞĞnjĞƉƌŽƚĞĐƚŝŽŶͿ͘ ŝ͘ sŽůƵŵĞƐĂďŽǀĞǁŝůůŽǀĞƌͲĚŝƐƉůĂĐĞĐĞŵĞŶƚŝŶƚŽĨŽƌŵĂƚŝŽŶďLJϭ͘Ϭďďů͘ ŝŝ͘ d'sŽůƵŵĞƚŽ'>Dηϰʹϲϵ͘ϱ> ŝŝŝ͘ /sŽůƵŵĞ&ƌŽŵ'>DηϰʹdDWĞƌĨŽƌĂƚŝŽŶ;ϴ͕ϬϴϬ͛DͿʹϮ͘ϱ> ŝǀ͘ /ŶũĞĐƚŝŽŶƉƌĞƐƐƵƌĞŵĂLJďĞŝŶĐƌĞĂƐĞĚƚŽƉƌĞǀĞŶƚůĞĂǀŝŶŐĐĞŵĞŶƚŝŶƚƵďŝŶŐ;ŵĂdžϭϬϬϬƉƐŝͿ͘ ϲ͘ ^WƵŵƉƐ͘ ϳ͘ DŽŶŝƚŽƌǁĞůůŚĞĂĚƉƌĞƐƐƵƌĞƐĨŽƌϭϱŵŝŶ;dͬ/ͬKͿ͘ ϴ͘ ZDKĞŵĞŶƚWƵŵƉŝŶŐhŶŝƚĂŶĚ>ŝƚƚůĞZĞĚWƵŵƉŝŶŐhŶŝƚ͘ ϵ͘ tKϰĚĂLJƐůĞĂǀŝŶŐ'ͲϭϵĂŶĚ'ͲϭϲƐŚƵƚŝŶ͘ ϭϬ͘ D/Zh>ŝƚƚůĞZĞĚWƵŵƉŝŶŐhŶŝƚ͘WdůŝŶĞƐƚŽϰ͕ϬϬϬƉƐŝ͘ ϭϭ͘ DŝdžĂŶĚďƵůůŚĞĂĚƚŚĞĨŽůůŽǁŝŶŐĨůƵŝĚƐ͗ Ă͘ нͬͲϱďďůŽĨϲϬͬϰϬDĞK,ͬŝĞƐĞů;ƚŽĞŶƐƵƌĞŝŶũĞĐƚŝǀŝƚLJͿ͘ ď͘ нͬͲϰϬďďůŽĨƐŽƵƌĐĞͬƉƌŽĚƵĐĞĚǁĂƚĞƌŽƌƵŶƚŝůŝŶũĞĐƚŝŽŶƌĂƚĞƐƚĂďŝůŝnjĞƐ;ƐĂŵĞƌĂƚĞĂƐŝŶũĞĐƚŝǀŝƚLJƚĞƐƚͿ͘ ϭϮ͘ ZDK>ŝƚƚůĞZĞĚWƵŵƉŝŶŐhŶŝƚ͘ ϭϯ͘ ŽŶƚĂĐƚKƚŽƌĞǀŝĞǁŝŶũĞĐƚŝŽŶƌĞƐƵůƚƐ͘ ϭϰ͘ dƵƌŶǁĞůůŽǀĞƌƚŽƉƌŽĚƵĐƚŝŽŶ͘ ƚƚĂĐŚŵĞŶƚƐ͗ ϭ͘ ƵƌƌĞŶƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB ZĞǀŝƐĞĚLJ͗d&ϭͬϭϵͬϮϬϮϮ ^,Dd/ DŝůŶĞWŽŝŶƚhŶŝƚ tĞůů͗DW'Ͳϭϵ >ĂƐƚŽŵƉůĞƚĞĚ͗ϭͬϬϭͬϮϬϬϱ Wd͗ϮϬϰͲϭϵϮ ^/E'd/> ^ŝnjĞ dLJƉĞ tƚͬ'ƌĂĚĞͬŽŶŶ / ƌŝĨƚ dŽƉ ƚŵ W& ϮϬΗ ŽŶĚƵĐƚŽƌ ϵϭ͘ϭͬ,ͲϰϬͬEͬ ϭϵ͘ϭϮϰ͟ ϭϴ͘ϵϯϲ͟ ^ƵƌĨĂĐĞ ϭϭϰΖ Ϭ͘ϯϱϱ ϵͲϱͬϴΗ ^ƵƌĨĂĐĞ ϰϬͬ>ͲϴϬͬd ϴ͘ϴϯϱ͟ ϴ͘ϲϳϵ͟ ^ƵƌĨĂĐĞ ϯ͕ϵϳϵ͛ Ϭ͘Ϭϳϱϵ ϳΗ WƌŽĚƵĐƚŝŽŶ Ϯϲͬ>ͲϴϬͬd ϲ͘Ϯϳϲ͟ ϲ͘ϭϱϭ͟ ^ƵƌĨĂĐĞ ϴ͕ϰϰϯ͛ Ϭ͘Ϭϯϴϯ dh/E'd/> ϯͲϭͬϮ͟ dƵďŝŶŐ ϵ͘ϯͬ>ͲϴϬͬhϴƌĚ Ϯ͘ϵϵϮ͟ Ϯ͘ϴϲϳ͟ ^ƵƌĨĂĐĞ ϴ͕Ϯϲϰ͛ Ϭ͘ϬϬϴϳ :t>Zzd/> EŽ ĞƉƚŚ /ƚĞŵ ϭ Ϯ͕Ϭϯϱ͛ ϯ͘ϱ͟,^yͲEŝƉƉůĞ;Ϯ͘ϴϭϯ͟WƌŽĨŝůĞͿ ϮϮ͕ϭϮϬ͛^ƚĂηϵ͗sĂůǀĞͲƵŵŵLJͬĂƚĞͲϭͬϬϭͬϮϬϬϱĂŵĐŽ<h'ͲDͬϭ͘ϱ͟<>ĂƚĐŚ '>Dd/>͗ϯ͘ϱ͟džϭ͘ϱ͟ĂŵĐŽDD'ǁͬϭ͘ϱ͟Z<>ĂƚĐŚ ϯ ϳ͕ϱϮϱ͛ ϯ͘ϱ͟,^yͲEŝƉƉůĞ;Ϯ͘ϴϭϯ͟WƌŽĨŝůĞͿ ϰ ϳ͕ϱϰϱ͛ ϳ͟džϯ͘ϱ͟ĂŬĞƌWƌĞŵŝĞƌWĂĐŬĞƌ ϱϳ͕ϱϳϭ͛^ƚĂηϴ͗sĂůǀĞͲƵŵŵLJͬĂƚĞͲϱͬϭϳͬϮϬϭϭ ϲϳ͕ϲϯϭ͛^ƚĂηϳ͗sĂůǀĞͲƵŵŵLJͬĂƚĞͲϭͬϬϭͬϮϬϬϱ ϳ ϳ͕ϳϱϭ͛ ϳ͟džϯ͘ϱ͟ĂŬĞƌWƌĞŵŝĞƌWĂĐŬĞƌ ϴϳ͕ϳϳϳ͛^ƚĂηϲ͗sĂůǀĞͲƵŵŵLJͬĂƚĞͲϱͬϭϳͬϮϬϭϭ ϵϳ͕ϴϯϴ͛^ƚĂηϱ͗sĂůǀĞͲƵŵŵLJͬĂƚĞͲϭͬϬϭͬϮϬϬϱ ϭϬ ϳ͕ϵϲϬ͛ ϳ͟džϯ͘ϱ͟ĂŬĞƌWƌĞŵŝĞƌWĂĐŬĞƌ ϭϭ ϳ͕ϵϴϳ͛^ƚĂηϰ͗sĂůǀĞͲƵŵŵLJͬĂƚĞϭϮͲϲͲϮϭ ϭϮ ϴ͕Ϭϰϳ͛^ƚĂηϯ͗sĂůǀĞͲƵŵŵLJͬĂƚĞͲϭϬͬϯϬͬϮϬϬϳ ϭϯ ϴ͕ϭϰϬ ϳ͟džϰ͘ϱ͟ĂŬĞƌ^ͲϯWĂĐŬĞƌ ϭϰ ϴ͕ϭϲϱ͛^ƚĂηϮ͗sĂůǀĞͲ ŵƉƚLJƉŽĐŬĞƚϭϮͲϮϮͲϮϬ ϭϱ ϴ͕ϮϮϰ͛^ƚĂηϭ͗sĂůǀĞͲƵŵŵLJͬĂƚĞͲϮͬϬϱͬϮϬϬϳ ϭϲ ϴ͕Ϯϱϭ͛ ϯ͘ϱ͟,^yEͲEŝƉƉůĞ;Ϯ͘ϴϭϯ͟WƌŽĨŝůĞͬϮ͘ϳϱϬEŽ'ŽͿWyEƉůƵŐͬƉƌŽŶŐ^ĞƚϯͬϬϭͬϬϱ ϭϳ ϴ͕Ϯϲϯ͛ ϯͲϭͬϮ͟t>'ʹŽƚƚŽŵΛϴ͕Ϯϲϰ͛ dZΘt>>, dƌĞĞ ϯͲϭͬϴ͟ͲϱDĂŵĞƌŽŶ tĞůůŚĞĂĚ ϭϭ͟džϯͲϭͬϴ͟ϱD&D'ĞŶϱǁͬϯ͘ϱ͟dͲ//dΘdŚƌĞĂĚ &DdƵďŝŶŐ,ĂŶŐĞƌϯ͘Ϭ͟/t͞,͟WsWƌŽĨŝůĞ 'EZ>t>>/E&K W/͗ϱϬͲϬϮϵͲϮϯϮϮϴͲϬϬͲϬϬ ƌŝůůĞĚΘĂƐĞĚďLJŽLJŽŶϭϰʹϭϭͬϭϭͬϮϬϬϰ dWWĞƌĨΘZĂŶŽŵƉůĞƚŝŽŶďLJEĂďŽƌƐϰ^ʹϭͬϬϭͬϮϬϬϱ KWE,K>ͬDEdd/> ϮϬ͟ ϮϲϬƐdžƌĐƚŝĐ^Ğƚ;ƉƉƌŽdž͘ͿŝŶĂϰϮ͟,ŽůĞ ϵͲϱͬϴ͟ ϰϲϴƐdžƌĐƚŝĐ^Ğƚ>ŝƚĞ͕ϰϬϱƐdž͚ůĂƐƐ'͕͛ŝŶĂϭϮͲϭͬϰ͟,ŽůĞ ϳ͟ ϱϬϲƐdžůĂƐƐ͚'͛ŝŶĂϴͲϯͬϰ͟ WZ&KZd/KEd/> ^ĂŶĚƐ dŽƉ;DͿ ƚŵ;DͿ dŽƉ;dsͿ ƚŵ;dsͿ &d ^W& ^ŝnjĞ ĂƚĞ ^ƚĂƚƵƐ E ϳ͕ϲϱϬ͛ ϳ͕ϲϴϬ͛ ϰ͕Ϯϯϰ͛ ϰ͕Ϯϰϲ͛ ϯϬ ϱ ϰ͘ϱ͟ ϭϮͬϮϵͬϮϬϬϰ KƉĞŶ E ϳ͕ϳϴϯ͛ ϳ͕ϴϮϯ͛ ϰ͕Ϯϴϱ͛ ϰ͕ϯϬϬ͛ ϰϬ ϱ ϰ͘ϱ͟ ϭϮͬϮϵͬϮϬϬϰ KƉĞŶ Kϴ͕ϬϬϰ͛ ϴ͕ϬϮϰ͛ ϰ͕ϯϲϳ͛ ϰ͕ϯϳϰ͛ ϮϬ ϱ ϰ͘ϱ͟ ϭϮͬϮϵͬϮϬϬϰ KƉĞŶ ϴ͕ϬϰϬ͛ ϴ͕ϬϴϬ͛ ϰ͕ϯϴϭ͛ ϰ͕ϯϵϲ͛ ϰϬ ϱ ϰ͘ϱ͟ ϭϮͬϮϵͬϮϬϬϰ KƉĞŶ K ϴ͕ϭϴϯ͛ ϴ͕Ϯϭϯ͛ ϰ͕ϰϯϲ͛ ϰ͕ϰϰϴ͛ ϯϬ ϱ ϰ͘ϱ͟ ϭϮͬϮϵͬϮϬϬϰ KƉĞŶ ZĞĨ>ŽŐ͗^ůŝŵĞŵĞŶƚDĂƉƉŝŶŐdŽŽůʹϭϭͬϮϰͬϮϬϬϰʹWĞƌĨ'ƵŶƐϰ͘ϱͬ͟dW'ƵŶƐ t>>/E>/Ed/KEd/> <KWΛϱϬϬ͛ DĂdžŚŽůĞĂŶŐůĞсϳϬĚĞŐ͘Ăƚϲ͕Ϭϭϲ͛D ,ŽůĞĂŶŐůĞƚŚƌƵƉĞƌĨƐсϲϴĚĞŐĂƚϳ͕ϴϯϵ͛D dс ϴ͕ϰϱϱ͛ ;DͿͬdсϰ͕ϱϰϳ͛;dsͿ ϮϬ ´ KƌŝŐ͘<ůĞǀ͗͘ϲϯ͘ϳϰ͛ͬKƌŝŐ͘'>ůĞǀ͗͘Ϯϵ͘Ϯ͛ Z<ʹ>^͗ϯϬ͘Ϯϳ͛ ϳ͟         ϵͲϱͬϴ͟  Wdс ϴ͕ϯϱϳ͛;DͿͬWdсϰ͕ϭϵϯ͛;dsͿ   2%6DQGV 2$6DQGV 1( 6DQGV 72&#¶5.% 86,7 5$7DJ¶  7DJZ´ &HQW DW¶0'       1%6DQGV 5$7DJ¶ DŝŶŝŵƵŵ/сϮ͘ϳϱϬ͟ Λϴ͕Ϯϱϭ͛ WĂĐŬĞƌ/сϯ͘ϴϳϱ͟ Λϴ͕ϭϰϬ͛ WĂĐŬĞƌ/сϮ͘ϴϳϱ͟ Λ ϳ͕ϵϲϬ͛ WĂĐŬĞƌ/сϮ͘ϴϳϱ͟ Λϳ͕ϳϱϭ͛ WĂĐŬĞƌ/сϮ͘ϴϳϱ͟ Λϳ͕ϱϰϱ͛ MEMORANDUM To: Jim Regg per `loll, I c t>z 1 P.I. Supervisor � FROM: Lou Laubenstein Petroleum Inspector Well Name MILNE PT UNIT G-19 Insp Num: mitLOL210928111803 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday, October 5, 2021 SUBJECT: Mechanical Integrity Tests Hilcorp Alaska, LLC G-19 MILNE PT UNIT G-19 Src: Inspector Reviewed By: P.I. Supry J�1>IZ Comm API Well Number 50-029-23228-00-00 Inspector Name: Lou Laubenstein Permit Number: 204-192-0 Inspection Date: 9/28/2021 Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well G-19 e -- . Tubing — - ---- : !Type J I w-1TVDp j� Tubin 6so - 6s1 " �— 6a9- -� -- - PTD 2041920 I{ BBL Pumped , 1.3 T e BBL Returned psi I 13 OA i 216 I 381 345 328 1500 IA 470 2040 - 1973 � 1954 Interval 4YPTST IPF p - �!-- -- -- ----- Notes: Tuesday, October 5, 2021 Page 1 of 1 MEMORANDUM TO: Jim Regg P.I. Supervisor FROM: Lou Laubenstein Petroleum Inspector Well Name MILNE PT UNIT G-19 Insp Num: mitLOL210928111512 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday, October 5, 2021 SUBJECT: Mechanical Integrity Tests Mleorp Alaska, LLC G-19 MILNE PT UNIT G-19 Sre: Inspector Reviewed By: P.I. Supry Comm API Well Number 50-029-23228-00-00 Inspector Name: Lou Laubenstein Permit Number: 204-192-0 Inspection Date: 9/27/2021 Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well G-19 Type Ind W "TVD 4196 Tubing 736 736 736 733 - 734 PTD 2041920 - Type Test'psi, — --- - 9 - 1 P ' 1500 jA � 1391 � 2015 ,, 1980 1991 -I 2016. BBL Pumped 0.6 - IBBi L Returned: 06 - OA 217 1 269 239 234 237 Interval -- --- - 4YRTST - - iPIF I - Notes: Test inconclusive due to plant upset, cancelled test and rescheduled for tomorrow. f Tuesday, October 5, 2021 Page 1 of 1 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday,September 13,2017 TO: Jim Regg P.I.Supervisor fedi e( ,'i SUBJECT: Mechanical Integrity Tests "( HILCORP ALASKA LLC G-I9 FROM: Jeff Jones MILNE PT UNIT G-19 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT G-19 API Well Number 50-029-23228-00-00 Inspector Name: Jeff Jones Permit Number: 204-192-0 Inspection Date: 9/9/2017 ' Insp Num: mitJJ170911104555 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well G-19 Type Inj W 'TVD 4196 Tubing 793 - 796 - 798 - 800 • PTD 2041920 ' Type Test SPT Test psi 1500 " IA 89 2035 - 1953 - 1939 - BBL Pumped: 1.6 BBL Returned: 1.6 OA 216 - 438 - 415 - 395 - Interval 4YRTST P/F P ✓ Notes: 1 well inspected,no exceptions noted. SCANNED -EBI 3 2U Wednesday,September 13,2017 Page 1 of 1 AP“ 4-t i Plt Regg, James B (DOA) �4 t qw From: AK, D&C Well Integrity Coordinator[AKDCWeIIlntegrityCoordinator @bp.com] Sent: Tuesday, October 01, 2013 9:45 PM To: Regg, James B (DOA); Wallace, Chris D (DOA); Brooks, Phoebe L (DOA); DOA AOGCC Prudhoe Bay Cc: AK, D&C Well Integrity Coordinator tfjq 01/13 Subject: September 2013 AOGCC MIT Forms ll Attachments: September 2013 MIT Forms.zip All, Please find the attached MIT forms for September 2013. WELL PTD# NOTES SCANNED ;, MPE-12 2050670 MPE-26 2002060 MPE-29 2010370 MPG-05 1910230 MPG-19 2041920 ✓ k06cc_ ,:ly■e_sS MPS-15 2012450 NK-18 1931770 NK-65A 2050630 09-22 1831730 14-21A 2051070 GNI-02A 2061190 EPA AND AOGCC FORM GNI-03 1971890 EPA AND AOGCC FORM GNI-04 2071170 EPA AND AOGCC FORM OWDW-NW 1002400 EPA AND AOGCC FORM OWDW-SE 1002390 EPA AND AOGCC FORM N-23 1970120 NGI-01 1750480 P-03A 1972280 U-05A 2090700 X-29 1931390 Please contact us with any questions. Thank you, Jack Disbrow BP Alaska-Well Integrity Coordinator Global Wells Organization Office: 907.659.5102 WIC Email:AKDCWelllntegrityCoordinatorPbp.com 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Submit to: jim.regq @alaska.gov; doa.aogcc.prudhoe.bay©alaska.00v; phoebe.brooks(caalaska.gov; tom.maunderI alaska.aov OPERATOR: BP Exploration(Alaska),Inc. 2 10j7(13 FIELD/UNIT/PAD: Prudhoe Bay/MPU/G-Pad "�z 1 DATE: 09/09/13 OPERATOR REP: Laurie Climer AOGCC REP: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well MPG-19 ' Type Inj. W TVD 4,196' Tubing 1608' '1611 '1600 '1595 Interval 4 P.T.D. 2041920 Type test P Test psi -1500 Casing 196 • '2300 _ 2230' 2210 - . P/F P ' Notes: Standard 4 year MITIA OA 224 426' 350 - 336' _Took 1.6 bbls to reach test pressure Well Type Inj. TVD Tubing Interval P.T.D. Type test_ Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD , Tubing Interval - P.T.D. Type test Test psi Casing P/F - - Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA TYPE INJ Codes TYPE TEST Codes INTERVAL Codes D=Drilling Waste M=Annulus Monitoring I=Initial Test G=Gas P=Standard Pressure Test 4=Four Year Cycle I=Industrial Wastewater R=Internal Radioactive Tracer Survey V=Required by Variance N=Not Injecting A=Temperature Anomaly Survey T=Test during Workover W=Water D=Differential Temperature Test 0=Other(describe in notes) Form 10-426(Revised 06/2010) MIT ACT MPG-19 09-09-13.xIs Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator[AKDCWelllntegrityCoordinator@bp.com] Sent: Thursday, September 12, 2013 9:37 PM To: AK, OPS MPU Fac O&M TL; AK, OPS MPU Field Ops TL; AK, OPS MPU OSM; AK, OPS MPU OSS; AK, OPS MPU Well Ops Coord; AK, D&C MPU WSL; Cismoski, Doug A; Daniel, Ryan; Weiss, Troy D; Regg, James B (DOA); Wallace, Chris D(DOA); Wood, Alecia; Redmond, Randy Cc: AKD&CDHDWelllntegri@bp.com; AK, D&C Projects Well Integrity Engineer; Climer, Laurie A Subject: OPERABLE: Injector MPG-19(PTD#2041920)Passing 4 yr compliance MIT-IA All, Injector MPG-19 (PTD#2041920) passed a AOGCC MIT-IA to 2300 psi,verifying two competent barriers. At this time the well is reclassified as Operable and may remain online as needed. Thank you, Laurie Climer �.ihL'rnuuc .lack hcsbroii) BPP Alaskaf - Well Integrity Coordinator SatItiECI MAX ry��� �7 V V la's a:'dve'�s Gita iza:C:1 WIC Office: 907.659.5102 WIC Email: AKDCWelllntegrityCoordinator@BP.com From: AK, D&C Well Integrity Coordinator Sent:Thursday, September 05, 2013 12:16 PM To: AK, OPS MPU Fac O&M TL; AK, OPS MPU Field Ops TL; AK, OPS MPU OSM; AK, OPS MPU OSS; AK, OPS MPU Well Ops Coord; AK, D&C MPU WSL; Cismoski, Doug A; 'Daniel, Ryan'; 'Weiss,Troy D'; 'jim.regg@alaska.gov'; 'chris.wallace@alaska.gov'; Wood, Alecia; Redmond, Randy Cc: AK, D&C DHD Well Integrity Engineer(AKD&CDHDWellIntegrk)bp.com); 'AK, D&C Projects Well Integrity Engineer; Climer, Laurie A; Bixby, Brian D Subject: UNDER EVALUATION: Injector MPG-19 (PTD #2041920) Due for 4 Year Compliance Testing All, Produced Water Injector MPG-19 (PTD#2041920) is available for an AOGCC witnessed MIT-IA.At this time the well is reclassified as Under Evaluation. Regards, Laurie Climer lharnaic Jack Dishrmi BP Alaska - Well Integrity Coordinator GINaot,a:w as Cic arri!at 0 1 1 WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator@BP.com From: AK, D&C Well Integrity Coordinator Sent: Friday, March 15, 2013 5:28 PM To: AK, OPS MPU Fac O&M TL; AK, OPS MPU Field Ops TL; AK, OPS MPU OSM; AK, OPS MPU OSS; AK, OPS MPU Well Ops Coord; AK, D&C MPU WSL; Cismoski, Doug A; 'Daniel, Ryan'; 'Weiss,Troy D'; 'jim.regg@alaska.gov'; 'chris.wallace@alaska.gov'; AK, D&C Well Integrity Coordinator; Wood, Alecia Cc: AK, D&C DHD Well Integrity Engineer(AKD&CDHDWellIntegri( bp.com); 'Ryan P Holt(Ryan.Holt@bp.com)'; Walker, Greg (D&C); Clingingsmith, Mike 3 Subject: NOT OPERABLE: Injector MPG-19 (PTD #2041920) Due for 4 Year Compliance Testing All, PWI Injector MPG-19(PTD#2041920) is due for its 4 year AOGCC compliance MITIA on 3/17/2013. The well is currently shut in, and will not be placed on injection prior to the AOGCC MITIA due date. The well is reclassified as Not Operable and will be added to the quarterly AOGCC not operable injector report. Plan forward: 1. Fullbore: Prior to returning the well to injection, MITIA to 2000 psi 2. Fullbore:Once on injection,AOGCC MITIA to 2000 psi when well is thermally stable Please call if you have any questions. Thank you, Jack Disbrow BP Alaska-Well Integrity Coordinator GWGlobal Wells Organlzatlor Office: 907.659.5738 WIC Email:AKDCWelIIntegrityCoordinator@bp.com 2 Wallace, Chris D (DOA) From: Regg, James B (DOA) Sent: Monday, September 09, 2013 10:26 AM To: Wallace, Chris D(DOA) Subject: FW: MPG-19 Op w/o Current MIT FollowFlag: Follow Up ag up Flag Status: Flagged Satisfied with this approach or should we do somethingmore formal? pp Jim Regg AOGCC Ng) SAY �. � 20IS 333 W.7th Ave,Suite 100 Anchorage,AK 99501 907-7934236 From: Redmond, Randy [mailto:RedmonRF@BP.com] Sent:Thursday, September 05, 2013 5:47 PM To: Regg,James B (DOA) Cc: Price, Bruce; AK, OPS MPU OSM; AK, OPS MPU Field Ops TL; Daniel, Ryan; Youngmun, Greg L; Williams, Bruce 3; AK, OPS FF Well Ops Comp Rep; O'Riordan, Colm J; Kiorpes, Steve T Subject: MPG-19 Op w/o Current MIT Dear Mr. Regg, As a follow up to my voice mail message today; On September 3rd of this year BPXA had discovered and shut in Milne Point Unit (MPU) Produced Water Injection Well, MPG-19, operating at minimum flow of 200-250 BPD with a WHIP of approximately 800 psig. This incident occurred as a result of misunderstanding of well status during a well work hand over. Wells Slickline began and completed well work activity during the period of August 30 to September 1st of this year. Operations received the well but did not understand that it was classified as "not operable" based on a non-current mechanical integrity test (MIT), ref. 20 AAC 25.402(e) and 25.412(c), and began flowing the well at minimum rate and pressure for a period of approximately two days prior to discovery. An MIT is being coordinated with the AOGCC Site Inspectors for the current month. BPXA has taken immediate action in initiating personnel progressive disciplinary action in not following procedures and practices, and to roll out additional training to clarify roles and responsibilities that ensure well status is verified and validated prior to flowing a well to prevent a re-occurrence. If you have any questions, please contact me 907-564-4889. Sincerely, Randy Redmond Randy Redmond, PE BPXA, Operations Full Field OSM 1 RedmonRF(c�BP.com 907-564-4889 cell 907-529-2689 2 bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 - ' :1 -'FEB 2 4 ral Mr. Tom Maunder Alaska Oil and Gas Conservation Commission Q04'1'7'9- 333 West 7 Avenue Anchorage, Alaska 99501 iv\ Subject: Corrosion Inhibitor Treatments of MPG -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPG -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) MPG -Pad 10/10/2011 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft gal MPG -01 1890290 50029219270000 Tanko conductor NA NA NA NA NA MPG -02 1890280 50029219260000 Tanko conductor NA NA NA NA NA MPG -03A 2042190 50029219420100 Tanko conductor NA NA NA NA NA MPG -04 1890450 50029219410000 Tanko conductor NA NA NA NA NA MPG -05 1910230 50029221380000 1.1 NA 1.1 NA 5.1 8/14/2011 MPG -07 1910250 50029221400000 0.1 NA 0.1 NA 3.4 9/4/2011 MPG -08A 1930480 50029221410100 0.2 NA 0.2 NA 2.6 10/10/2011 MPG -09 1971170 50029227790000 1.3 NA 1.3 NA 15.3 10/30/2009 MPG -10 1971180 50029227800000 2.1 NA 2.1 NA 20.4 10/30/2009 MPG -11 1971190 50029227810000 0.8 NA 0.8 NA 5.1 8/14/2011 MPG -12 1971420 50029227920000 1.3 NA 1.3 NA 8.5 8/14/2011 MPG -13 1971200 50029227820000 1.2 NA 1.2 NA 10.2 10/30/2009 MPG -14 2011330 50029230310000 0.8 NA 0.8 NA 4.3 9/4/2011 MPG -15 1971220 50029227840000 2.9 NA 2.9 NA 34.0 10/30/2009 MPG -16 2032100 50029231890000 1.8 NA 1.8 NA 17.0 8/15/2011 MPG -17 2040130 50029231920000 1.6 NA 1.6 NA 14.5 8/15/2011 MPG -18 2040200 50029231940000 1.6 NA 1.6 NA 13.6 8/15/2011 " MPG -19 2041920 50029232280000 1.6 NA 1.6 NA 13.6 8/15/2011 • • f___ ,, S WELL LOG TRANSMITTAL PROACTIVE DIAGNOSTIC SERVICES, INC. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793 -1225 RE : Cased Hole /Open Hole /Mechanical Logs and/or Tubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt b 9 g p by returning a signed copy of this transmittal letter to the following : BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2 - 1 900 Benson Blvd. Anchorage, Alaska 99508 and UT a q A D ProActive Diagnostic Services, Inc. Attn: Robert A. Richey a09 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245 -8952 &L AINED MAY 2 3 2011 1) Injection Profile 17 Apr MPU G BL / EDE 50 - 029 - 23228 - 00 2) _;, ,._- °, - ;' 1 ` ' ._f J _� -l_ Signed : D---- Date : ; vI 11 _ , v .�,J..£ Print Name: -_,,, .gi s, PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245 -8951 FAx: (907)245 -88952 E-MAIL: Asanc`1cr ti. e. {7men ort!o .corn WEBSITE : b" ww.memonvaoq.com C:1Documents and Settings\Diane Williams \Desktop\BP_Transmit.docx WELL LOG TRANSMITTAL lAL PROACTIVE Di ACINOS& SIM ACES, INC. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907] 793 -1225 RE: Cased Hole /Open Hole /Mechanical Logs and /or Tubing Inspection(Caliper/ MTTJ The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2 -1 900 Benson Blvd. Anchorage, Alaska 99508 and I ProActive Diagnostic Services, Inc. _ Attn: Robert A. Richey LT"r C-9OS -tG3 ad 3�C� 130 West International Airport Road Suite C Nov Anchorage, AK 99518 Fax: (907) 245 -8952 11 )1 Injection Profile 14 -Aug -10 MPU G-1 8L / ED 50 -029- 23228 -00 2) Injection Profile 14-Aug-1 O MPU C-28A EIL / EDE Signed: Date 3 Print Name: °;l ' c- x. PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245 -8951 FAX: (907)24548952 E- MAIL : gdsanchorageaa memoryloO com WESSiTE : www.memorylog.com CADocuments and Settinp\Diane WWiams\Desktop \Transmit_BP.docx MEMORANDUM To: Jim Regg ~~ ~ j ~ Z-7 ~D 1 P.I. Supervisor i,RONI: Bob Noble Petroleum Inspector State of Alaska ~laslia Oil and Gas Conservation Commission DATE: Tuesday, March 24, 2009 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC G-19 MILNE PT UNIT SB G-19 Src: Inspector NON-CONFIDENTIAL Reviewed Bye P.I. Suprv ~ B'~ Comm Well Name: MILNE PT UNIT SB G-19 Insp Num: mitRCN090321143858 Rel Insp Num: API Well Number: 50-029-23228-00-00 Permit Number: 204-I92-0 ~ Inspector Name• Bob Noble Inspection Date: 3!17/2009 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well G-19 Type Illy. W TVD 4196 ~ 140 2010 1930 1910 i P.T. 2041920 TypeTest sPT Test psi 2010 QA 250 300 300 300 Interval 4YRTST P/F P Tubing 900 900 900 900 Notes: ~"I~n ~S~ ~`~Su~~ 1~Si ,~~ ~~,yy CC~~ [ i~'~ Tuesday, March 24, 2009 Page 1 of 1 • • „v-, .~ MICROFILMED 03/01/2008 DO NOT PLACE .s•~ V P~ Sd~+ w T~_. _ ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs_Inserts\Microfilm Marker.doc Permit to Drill 2041920 ----~~ MD 8455 ........../ TVD ~~ J ~ ~ ì DATA SUBMITTAL COMPLIANCE REPORT 12/11/2006 Well NamelNo. MILNE PT UNIT SB G-19 4547 ré;~Pletion Date 12/29/2004 REQUIRED INFORMATION .,- Mud Log No DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, GYRO, IFR/CASANDRA, eel Well Log Information: Log/ Data Digital Typ~ Med/Frmt (2iJD'Asc ~ ." I'~ ~---~-------~----- Electr Dataset Number Tap Name Directional Survey Directional Survey Directional Survey Directional Survey C'9r;R9Rt ~\l2IM~tign ì)~l[~~~~ Cement Evaluation 13166 I nd u ction/Resistivity 13166 LIS Verification 13520 Induction/Resistivity Well Cores/Samples Information: Name Interval Start Stop ADDITIONAL INFORMATION Well Cored? Y ~ - Chips Received? Y / N Analysis Received? ~ ~---"-,--- -~--~--~ Operator BP EXPLORATION (ALASKA) INC Completion Status 1WINJ Current Status 1WINJ --~--_._~- -~----------,. - -----~-,-,-,-~ API No. 50-029-23228-00-00 ~- -~"'- '._-~--~---_._---- ----_._-~ --_._---~-,_. ---.--. -~~_._-~ Directional surv~. Samples No (data taken from logs Portion of Master Well Data Maint Log Log Scale Media Interval Start Stop 0 8455 0 8455 0 8455 0 8455 2888 8378 2000 8370 2/28/2005 Run No OH/ CH Received 12/21/2004 12/21/2004 12/21/2004 12/21/2004 & 131i: Oeae 5 Col 72 8418 Open 6/10/2005 72 8418 Open 6/10/2005 114 8455 2/22/2006 Sample Set Sent Received Number Comments Daily History Received? ~: Formation Tops --~-_._---------- ~,- -----~-,._._~_.._-_.~ ~~- Comments IIFR IIFR MWD MWD . ----~l I OCMCtn MAr 8. IMAGC ~oc, SLIM CCMDJT MArriNG TOOL cement map & image log/slim cement mapping tool MWD:GRlEWR4/ROP MWD:GRlEWR4/ROP ROP DGR EWR plus Graphics . - ---~ Permit to Drill 2041920 MD 8455 TVD 4547 Comments: DATA SUBMITTAL COMPLIANCE REPORT 12/11/2006 Well Name/No. MILNE PT UNIT 5B G-19 Compliance Reviewed By: Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23228-00-00 Completion Date 12/29/2004 Completion Status 1WINJ Current Status 1WINJ UIC Y F ----~ Date: ---D J.Jv- .uro 7'- . . . . WELL LOG TRANSMITTAL UIL 804~ ¡qº- To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West ih Ave., Suite 100 Anchorage, Alaska 99501 February 16, 2006 135~O RE: MWD Formation Evaluation Logs MPG-19, The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500 MPG-19: LAS Data & Digital Log Images: 50-029-23228-00 1 CD Rom ~ ~19010(ç . 202-()~ ,;2.tf) - I fé :< ó /-1 .f?;;' ftD i;~2-.1 2.0""- OJ· A-o 1-02 .;2.or- I <g . 02122105 Schlumberger NO. 3346 Schlumberger-DCS 2525 Gambell S~ Suite 400 Anchorage, AK 99503-2838 A TTN: Beth Company: Alaska Oil & Gas Cons Comm Attn: Helen Wannan 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Milne Point Midnight Sun Well Job# Log Description Date Color BL CD MPS-21 10670013 MEM CBL 05/03/04 1 MPE-25 L 1 10687675 CBL 03/30/04 1 - MPG-19 10900120 SCMT 11/25/04 1 f/ PB·27 10964102 SCMT 11/30/04 1 MPE-25A 10703992 SCMT 04/18/04 1 MPC-42 10830797 SCMT 05/01/04 1 ~ E-102 10672379 RST 05/01/04 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2~ 1 900 E Benson Blvd. Anchorage AK 99508-4254 , / 2jz,~'0 ) V' I Schlumberger DCS 3940 Arctic Blvd Suite 300 Anchorage AK 99503-5789 /' ^TI'~jd . -~_/ ÎJ'~ Date Delivered: · STATE OF ALASKA _ ALASKA AND GAS CONSERVATION COM~ION WELL COMPLETION OR RECOMPLETION REPORT AND LOGRECEIVED RevisiMÅ'ff/~11f52ß~ Injection 1a. Well Status: D Oil DGas D Plugged D Abandoned D Suspended DWAG 1b. Well Class: 20AAC 25.105 20AAC 25.110 AblIk&61ûr8fl&' CiJ.~ion DGINJ BWINJ D WDSPL No. of Completions One Other D Stratigrap rvice 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Num er BP Exploration (Alaska) Inc. 12/29/2004 204-192-00 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 11/1/2004 50- 029-23228-00-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 11/8/2004 MPG-19i 1576' NSL, 3338' WEL, SEC. 27, T13N, R10E, UM 8. KB Elevation (ft): 15. Field I Pool(s): Top of Productive Horizon: 3464' NSL, 3550' WEL, SEC. 26, T13N, R10E, UM (NB) KBE = 63.74' Milne Point Unit I Schrader Bluff Total Depth: 9. Plug Back Depth (MD+ TVD) 3428' NSL, 2793' WEL, SEC. 26, T13N, R10E, UM 8357 + 4506 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: 557269 6014012 Zone- ASP4 8455 + 4547 Ft ADL 025518 x- y- .. 11. Depth where SSSV set 17. Land Use Permit: TPI: x- 562318 y- 6015941 Zone- ASP4 ~-- -~-- N/A MD Total Depth: x- 563075 y- 6015911 Zone- ASP4 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey DYes BNo N/A MSL 1800' (Approx.) 21. Logs Run: MWD , GR , GYRO, IFR/CASANDRA , CCL 2. CASING, liNER AND CEMENTING RECORD CASING SE1TING DI;F'TIi MD :;jETTING UEPTH TVD HO!..!; PÓtL~b SIZE WT. PER FT. GRADE TOP BOTTOM TOP I BOTTOM SIZE CEMENTINGRECORQ 20" 94# H-40 35' 114' 35' 114' 42" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 35' 3979' 35' 2911' 12-1/4" 468 sx AS Lite, 405 sx Class 'G' 7" 26# L-80 32' 8443' 32' 4542' 8-3/4" 506 sx Class 'G' 23. Perforations open to Production (MD + TVD of Top and 24. TUBING RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Gun Diameter, 5 SPF 3-1/2", 9.3#, L-80 8264' 7545,7751', MD TVD MD TVD 7960' & 8140' NB Sands NB Sands OA Sands OA Sands 25. ACIO,·. FRACTURE, CEMENfsOUEEZE,¥TC. 7650' - 7680' 4235' - 4246' 8004' - 8024' 4367' - 4375' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 8040' - 8080' 4381' - 4396' NE Sands NE Sands Freeze Protected with 70 Bbls of Diesel OB Sands OB Sands 7783' - 7823' 4285' - 4300' 8183' - 8213' 4417' - 4448' 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): March 4, 2005 Water Injection Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD .. Flow Tubing Casing Pressure CALCULATED .. OIL-BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR) Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None RBDMS 8Fl MAR 2 3 2005 (;~ . I Form 10-407 Revised 12/2003 CONTINUED ON R~~R$È\Slqè! ß\ 1 28. GEOLOGIC MARKERS 29. NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". SBF2-NA SBF21 SBF24-MF SBF1-NB SBF12 SBE4-NC SBE41 SBE3-ND SBE2-NE SBE1-NF TSBD-OA TSBC TSBB-OB SBA5 7554' 7575' 7622' 7635' 7695' 7707' 7720' 7747' 7766' 7896' 7980' 8074' 8160' 8223' 4199' 4207' 4224' 4229' 4252' 4256' 4261' 4271' 4278' 4327' 4358' 4394' 4427' 4452' None 30. List of Attachments: Well Schematic Diagram and a Post Rig Work Summary. 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ f) T tl T h· I A . t t Sd(¡dra Stewmaþ -Z/t i e ec mea 5515 an Date 03 - 7J -0 S- MPG-19i Well Number 204-192-00 Permit No. I A roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Prepared By Name/Number: Drilling Engineer: Sandra Stewman, 564-4750 Skip Coyner, 564-4395 ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only Tree:Cameron 3 1/8" 5 Wellhead: FMC 11" X 3.5 gen 5 tbg hanger. TC-II T & B thread. 3.5 CIW 'H' BPVT 20" 91.1 ppf H-40 ~ 9 S/8" Weatherford Float Collar 3894' 9 S/8" Weatherford Float Shoe 3979' RA Tag 7490' * KOP @ 500' Max. hole angle = 70 deg @ 6000' Hole angle thru' perfs = . 3.5", 9.3 ppf, L-80 TC-II Tbg (cap. = 0.0087 bpf, drift = 2.867") 7" 26#, L-80, BTRC Casing (drift ID = 6.151, cap.= .0383 bpf) RA Tag 7842' * Perforation Summary SWS Slim Cement bond log dated; 11/24/04 Size Spf Interval (TVD) N8 Sands 4.S" S 7,6S0' - 7,680' 4,234' - 4,246' NE Sands 4.S" S 7,783' - 7,823' 4,28S' - 4,300' OA Sands 4.S" S 8,004' - 8,024' 4,367' - 4,374' 4.S" S 8,040' - 8,080' 4,381' - 4,396' 08 Sands 4.S" S 8,183' - 8,213' 4,436' - 4,448' DATE 11/10/04 01/01/0S MPG-19i REV. BY COMMENTS Lee Hulme Drilled & Cased by Doyon 14 MOO Perforate & Complete Nabors 4-es orige Elev. = 59.30' (D-14) Orig. RT-LDS Elev. = 30.27' (D-14) 3.S" HES X-Nipple (2.813" pkg.) 2,035' 3.S" x 1" Camco KBUG-M GLM 2,120' 3.S" HES X-Nipple (2.813" pkg.) I 7,525' 7" x 3.S" Baker Premier Packer I 7,545' 3.S" x 1.S" Camco MMG-W GLM I 7,571' 3.S" x 1.S" Cameo MMG GLM 7,631' 7" x 3.S" Baker Premier Packer 7,751' 3.S" x 1.S" Cameo MMG-W GLM 7,777' 3.S" x 1.S" Camco MMG GLM 7,838' 7" x 3.S" Baker Premier Packer I 7,960' 3.S" x 1.S" Cameo MMG-W GLM I 7,987' 3.S" x 1.S" Camco MMG GLM 8,047' 7" x 3.S" Baker S-3 Packer 8,140' 3.S" x 1.S" Cameo MMG-W GLM 8,165' 3.S" x 1.S" Cameo MMG GLM 8,224' 3.S" HES XN-Nipple (2.813" pkg.) I 8,251' 2.7S0" No-Go ID I 8,264' 3.S" WLEG 7" Weatherford Float Collar ~ 7" Weatherford Float Shoe ~ MILNE POINT UNIT WELL No.: MPG-19i API: 50-029-23228-00 BP EXPLORATION (AK) .. " . . Well: MPG-19i Field: Milne Point Unit I Schrader Bluff API: 50-029-23228-00-00 POST-RIG WORK 02/22/05 PULLED BPV, CHASER BAR, ROLLER BALL AND ROD AND PULLED DCK. SET DGLV IN SPM (2120' MD) ALSO PULLED RHC-M. 02/23/05 PERFORMED "OB" SBHP AT 7698' MD & 8198' MD (MID PERF) PT IA WI TRIPLEX TO 1000#, HELD, BLED BACK TO 0# TAG TD AT 8358' MD, 16' CORR OFF XN NIPPLE. 94' RATHOLE BELOW WLEG DRIFTED TUBING WI 2.8" CENT, BLB. ATTEMPTED TO PUMP WI LRS. COULD NOT ESTABLISH A BENEFICIAL RATE FOR BRUSH AND FLUSH. BRUSHED TROUBLE AREAS. BRUSH COVERED WITH TAR LIKE SUBSTANCE. ATTEMPTED TO SET PXN BODY. FIGHTING ALL THE SPM'S AND TIGHT SPOTS GOING IN. PRESET IN SPM @ 8047' MD. PULLED PXN BODY FROM SPM. WILL NEED PUMP ASSISTANCE TO GET DOWN THE HOLE. PUMP 8 BBLS DIESEL DOWN TBG TO ASSIST SLlCKLlNE. 02/28/05 MADE ONE ATTEMPT TO SET PLUG, COULD NOT MAKE DEPTH, METAL MARKS ON PXN BODY AND METAL IN PACKING DRIFTED WI BLB, 2.81" GAUGE RING WHILE LRS PUMPED 1 1/4 BBLSIMIN DOWN TUBING (PUMPED 51 BBLS DIESEL) SET 2.81" PXN PLUG BODY. PUMPED 26 BBLS OF DIESEL @ 1 BBUMIN WHILE SETTING 03/01/05 SET "P" PRONG (PRONG HAS 2.4" CENT BUILT IN) PT TUBING WI LRS TO 3000#, PLUG HELD MADE SEVERAL ATTEMPT AT PULLING DGLV FROM SPM @ 7987' MD. SHEARED ONE TOOL, COULD NOT LATCH AGAIN. LIB POCKET. VALVE DROPPED IN WELLBORE PRESSURE TEST PLUG TO 3000 PSI, PASSED, TOOK .6 BBLS DIESEL TO PRESSURE UP. 03/02/05 FISHED 1 112" DGLV FROM TOP OF PLUG SET 1 1/2" CV (1/2" PORT) IN SPM @ 7987' MD PERFORMED "OA" ONLY SBHP, STOPS AT 7542' MD (4195' TVD) AND 8042' MD (4381' TVD) a STATE OF ALASKA __ ALAS~L AND GAS CONSERVATION COM-.sION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: 0 Oil o Gas o Plugged o Abandoned o Suspended o WAG 1 b. Well Class: 20AAC 25.105 20AAC25.110 o Development o Exploratory OGINJ aa WINJ o WDSPL No. of Completions One Other o Stratigraphic aa Service 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 12/29/2004 .. 204-192-00 3. Address: 6. Date SPuddedt.Æ> Þ . iJ'; 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 11 2004 .J....,. 50- 029-23228-00-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: . 11/8/2004 MPG-19i 1576' NSL, 3338' WEL, SEC. 27, T13N, R10E, UM 8. KB Elevation (ft): 15. Field I Pool(s): Top of Productive Horizon: 3464' NSL, 3550' WEL, SEC. 26, T13N, R10E, UM (NB) KBE = 63.74' Milne Point Unit I Schrader Bluff Total Depth: 9. Plug Back Depth (MD+ TVD) 3428' NSL, 2793' WEL, SEC. 26, T13N, R1OE, UM 8357 + 4506 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 557269 . y- 6014012 / Zone- ASP4 8455 + 4547 Ft ADL 025518 --. 11. Depth where SSSV set 17. Land Use Permit: TPI: x- 562318 y- 6015941 Zone- ASP4 Total Depth: x- 563075 . y- 6015911 ' Zone- ASP4 N/A MD -- ~- .. .. .. .. 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey aa Yes ONo NI A MSL 1800' (Approx.) 21. Logs Run: MWD , GR , GYRO, IFR/CASANDRA , CCL 122. CASING, LINER AND CEMENTING RECORD CASING ~ETT1NG DEPTH Me SETTING EPTH TVD HOLE ....... ~~~ SIZE Wt. PEFlFT. GRAPE TOP ~íTOM TOP BOíTOM SIZE PULLEQ 20" 94# H-40 35' 114' 35' 114' 42" 60 sx Arctic Set (Approx.) 9-5/8" 40# L-80 35' 3979' 35' 2911' 12-1/4" 68 sx AS Lite, 405 sx Class 'G' 7" 26# L-80 32' 8443' 32' 4542' 8-3/4" 06 sx Class 'G' 23. Perforations open to Production (MD + TVD of Top and 24. ·.luBINS"" \ ......... Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Gun Diameter, 5 SPF 3-1/2",9.3#, L-80 8264' 7545,7751', MD TVD MD TVD 7960' & 8140' NB Sands N8 Sands OA Sands OA Sands 25. ·,6,CIQ.... E"rç; < \..iEMENT < 7650' - 7680' 4235' - 4246' 8004' - 8024' 4367' - 4375' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 8040' - 8080' 4381' - 4396' NE Sands N E Sands Freeze Protected with 70 Bbls of Diesel 08 Sands 08 Sands 7783' - 7823' 4285' - 4300' 8183' - 8213' 4417' - 4448' 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test Hours Tested PRODUCTION FOR Oll-BBl GAs-McF WATER-BBl CHOKE SIZE I GAS-Oil RATIO TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Oll-Bsl GAs-McF WATER-BBl Oil GRAVITy-API (CORR) Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate she~t,if necessary). Submit core chips; if none, state "none". .~."'_."--~'"."-"-'-"'.""'-'.,..-.....~"'-:" ~ {X:}.,::;JJ,::TjDN ~ None RBDMS 8Ft FEB 0 4 2005 ~ 1~/iJj. 01 L \AJF- t GF \_Z,..,..l......'""~~~t Form 1 0-407 Revised 12/2003 CONTINUED ON REVERSE SIDE G 28. . GEOLOGIC MARKER 29. RMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". SBF2-NA SBF21 SBF24-MF SBF1-NB SBF12 SBE4-NC SBE41 SBE3-ND SBE2-NE SBE1-NF TSBD-OA TSBC TSBB-OB SBA5 7554' 7575' 7622' 7635' 7695' 7707' 7720' 7747' 7766' 7896' 7980' 8074' 8160' 8223' 4199' 4207' 4224' 4229' 4252' 4256' 4261' 4271' 4278' 4327' 4358' 4394' 4427' 4452' None 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys, Leak-Off Test Summary. 31. I hereby certify that the foregoing is true an orrect to the best of my knowledge. Signed Title Technical Assistant Date Œ-03--0S- MPG-19i Well Number Prepared By Name/Number: Drilling Engineer: Sondra Stewman, 564-4750 Skip Coyner, 564-4395 204-192-00 Permit No. / A roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 1 0-407 Revised 12/2003 Submit Original Only Tree:Cameron 3 1/S" 5 Wellhead: FMC 11" X 3. en 5 tbg hanger. TC-II T & B thread. 3.5 CIW 'H' BPVT 20" 91.1 ppf H-40 ~ 9 S/8" Weatherford Float Collar ~ 9 S/8" Weatherford Float Shoe ~ RA Tag 7490' * KOP @ 500' Max. hole angle = 70 deg @ 6000' Hole angle thru' perfs = . 3.5", 9.3 ppf, L-SO TC-II Tbg (cap. = 0.00S7 bpf, drift = 2.867") 7" 26#, L-80, BTRC Casing (drift ID = 6.151, cap.= .0383 bpf) RA Tag 7842' * Peñoration Summary SWS Slim Cement bond log dated: 11/24/04 Size Spf Interval (TVD) NB Sands 4.5" S 7,650' - 7,680' 4,234' - 4,246' NE Sands 4.S" S 7,783' - 7,823' 4,28S' - 4,300' OA Sands 4.S" S 8,004' - 8,024' 4,367' - 4,374' 4.S" S 8,040' - 8,080' 4,381' - 4,396' OB Sands 4.S" S 8,183' - 8,213' 4,436' - 4,448' DATE 11/10/04 01/01/05 MPG-19i REV. BY COMMENTS Lee Hulme Drilled & Cased by Doyon 14 MDO Perforate & Complete Nabors 4-es or¡g. Elev. = 59.30' (D-14) Orig. RT-LDS Elev. = 30.27' (D-14) 3.S" HES X-Nipple (2.813" pkg.) 2,035' 3.S" x 1" Cameo KBUG-M GLM 2,120' 3.S" HES X-Nipple (2.813" pkg.) 7,525' 7" x 3.S" Baker Premier Packer 7,545' 3.S" x 1.5" Camco MMG-W GLM 7,571' 3.5" x 1.S" Cameo MMG GLM 7,631' 7" x 3.S" Baker Premier Packer 7,751' 3.S" x 1.S" Cameo MMG-W GLM 7,777' 3.S" x 1.5" Cameo MMG GLM 7,838' 7" x 3.S" Baker Premier Packer I 7,960' 3.5" x 1.S" Cameo MMG-W GLM I 7,987' 3.S" x 1.5" Cameo MMG GLM 8,047' 7" x 3.S" Baker S-3 Packer 8,140' 3.S" x 1.S" Cameo MMG-W GLM 8,165' 3.S" x 1.5" Cameo MMG GLM 8,224' 3.S" HES XN-Nipple (2.813" pkg.) I 8,251' 2.7S0" No-Go ID I 8,264' 3.S" WLEG 7" Weatherford Float Collar ~ 7" Weatherford Float Shoe ~ MILNE POINT UNIT WELL No.: MPG-19i API : 50-029-23228-00 BP EXPLORATION (AK) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPG-19 M PG-19 ORIG DRILLING DOYON DRILLING INC. DOYON 14 Start: 10/30/2004 Rig Release: 11/11/2004 Rig Number: Spud Date: 11/2/2004 End: 11/1/2004 12:00 - 13:00 1.00 MOB P PRE PJSM - Skid rig floor from drlg position to move position 13:00 - 18:00 5.00 MOB P PRE PJSM - Move rig from well MPH-16 to MPG-19i - Shim up rig 18:00 - 20:00 2.00 RIGU P PRE PJSM - Skid rig foor from move position to drlg position - Build berm for rockwasher - spot rockwasher - Accept rig at 20:00 hrs on 11/1/2004 20:00 - 22:30 2.50 DRILL P SURF PJSM - Nipple up diverter - diverter line - Load pipe shed with Ip 4" DP - Perform derrick inspection 22:30 - 00:00 1.50 DRILL SURF PJSm - Pick up 4" dp from pipe shed and stand back in derrick 11/2/2004 00:00 - 08:00 8.00 DRILL P SURF Pick up 4" dp - 5" HWT from pipe shed and stand back in derrick - 08:00 - 09:00 1.00 DRILL P SURF Moblize BHA - Rig up Gyro equipement 09:00 - 09:30 0.50 EVAL P SURF Conduct diverter function test - Accumulator test - John Crisp with AOGCC wavied witness of test 09:30 - 10:00 0.50 DRILL P SURF Pre Spud meeting 10:00 - 11 :00 1.00 DRILL P SURF Make up BHA 11 :00 - 11 :30 0.50 DRILL P SURF Fill conductor with mud - circ through system - Check out mud circulation system for leaks 11 :30 - 00:00 12.50 DRILL P SURF Drill from 114' to 1091' - WOB 20 to 35 - RPM 60 to 80 - TO on 5 - off 2 - GPM 381 - PP on 1260 - off 810 - PU 94 - SO 92- ROT 94 11/3/2004 00:00 - 13:30 13.50 DRILL P SURF Directional Drill from 1091' to 2535' - WOB 5 to 20 - RPM 80 - TO on 5.5 - off 3 - GPM 460 - PP on 2130 - off 1950 - PU 110- SO 92 - ROT 116 13:30 - 14:30 1.00 DRILL P SURF CBU 2 X - Pump at 460 GPM - PP 1920 14:30 - 17:30 3.00 DRILL P SURF Pump out from 2535' to HWT @ 710' - Pump at drlg rate - Lots of sand across shakers - Circ at 710' at 250 to 300 gpm - Stage in hole from 710' to 1096' - GPM 350 @ 1300 psi - RPM 60 17:30 - 18:00 0.50 DRILL P SURF RIH from 1096' to 2440' 18:00 - 19:00 1.00 DRILL P SURF Precauctionary wash from 2440' to 2535' - CBU 1 X - Lots sand over shakers - 2100 strokes - Shakers cleaned up 19:00 - 00:00 5.00 DRILL P SURF Directional Drill from 2535' to 3205' - WOB 20 - RPM 75 - TO on 6 - off 4 - GPM 500 - PP on 2500 - off 2200 - PU 110 - SO 85 - ROT 100 11/4/2004 00:00 - 06:30 6.50 DRILL P SURF Directional Drill from 3205' to 3988' - TD 12.25" Surface Hole - WOB 5 to 35 - RPM 70 -80 -TQ on 6 - off 4 - GPM 500 - PP on 2570 - OFF 2450 - PU 120 - SO 80 - ROT 100 06:30 - 09:00 2.50 CASE P SURF CBU 3 X - RPM 80 - TO 4 - GPM 500 - PP 2530 09:00 - 11 :30 2.50 CASE P SURF Flow check - Well static - Pump out to 1300' - Pump out 400 gpm - Pull with out pump to 710' 11 :30 - 13:00 1.50 CASE P SURF RIH from 710' to 3988' - No Problems 13:00 - 15:30 2.50 CASE P SURF CBU 3 X - RPM 80 - TQ 7 - GPM 500 - PP 2730 psi 15:30 - 19:00 3.50 CASE P SURF Pump out fron 3988 to 1100' - Con't POH to HWT - Stand back HWT - Jars 19:00 - 21 :00 2.00 CASE P SURF Lay down Flex DC's - MWD - Motor - Clear and clean rig floor 21 :00 - 22:30 1.50 CASE P SURF PJSM - Rig up casg tools - Moblize casg tools - Change bails- MU franks fill up tool - Rig up casg power tongs - Slip - elevators 22:30 - 00:00 1.50 CASE P SURF Pick up float equipment - Check float equipment - Con't pick up and run 9 5/8" 40# L-80 - BTC casing to 1025' 11/5/2004 00:00 - 03:00 3.00 CASE P SURF Run 9 5/8" 40# L-80 BTC-M - from 1025' to 3938' - Break circulation last joint ran - Circulate joint down - Good returns - No Problems 03:00 - 03:30 0.50 CASE P SURF Pick up landing joint - Make up hanger - RIH from 3938' to Printed: 11/15/2004 9:54: 13 AM Legal Well Name: MPG-19 Common Well Name: MPG-19 Spud Date: 11/2/2004 Event Name: ORIG DRILLING Start: 1 0/30/2004 End: Contractor Name: DOYON DRILLING INC. Rig Release: 11/11/2004 Rig Name: DOYON 14 Rig Number: Date 11/5/2004 03:00 - 03:30 0.50 CASE P SURF 3978' -land casing on landing ring - Total Joints ran 96 03:30 - 04:00 0.50 CASE P SURF Break and lay down Franks fill up tool - Make up Schlumberger cementing head - Cementing line 04:00 - 07:00 3.00 CASE P SURF Break circulation - Stage up pump from 3.4 bm @ 220 psi to 9.5 bpm @ 350 PSI 07:00 - 09:00 2.00 CEMT P SURF Give to Schlumberger Pump 5 bbls water T est lines to 3000 psi Pump 10 bbls fresh water @ 5 bpm - 50 psi Pump 20 bbls CW100 @ 5 bpm - 50 psi Pump 75 bbls 10.5 ppg Mud Push @ 5 bpm - 40 psi - (one gallon dye in 1 st 5 bbls of slurry) Drop bottom plug Pump 468 sxs 372 bbls Type "ASL" Yield 4.44 cf/sx mixed at 10.7 ppg @ 7 bpm - 100 psi Pump 406 sxs 85 bbls Class G Yield 1.21 cflsx mixed at 15.8 ppg @ 5 bpm - 150 psi Kick out top plug with 30 bbls fresh water @ 7 bpm - 80 psi Give to rig for displacement 09:00 - 10:00 1.00 CEMT P SURF Displace cement with 265 bbls mud - 5 bpm @ 250/830 psi last 15 bbls slow pump to 3 bpm @ 800 - Bump plug with 1800 psi 1000 psi over pumping pressure - Check floats - Floats holding - CIP @ 09:55 hrs - (Cement to surface 177 bbls) 10:00 - 11 :30 1.50 CASE P SURF ND Cement head - Flush stack with water - Lay down landing joint 11 :30 - 12:30 1.00 CASE P SURF Clear rig floor of all casg / cementing tools 12:30 - 14:00 1.50 CASE P SURF ND Diverter system 14:00 - 16:30 2.50 CASE P SURF Install wellhead - Test metal to metal seal to 1000 psi for 10 min - good test 16:30 - 20:00 3.50 CASE P SURF NU BOP's - Run Gyro survey while tighten up bolts - Nipple up choke - kill lines on stack - Depth of survey 2000' 20:00 - 21 :00 1.00 CASE P SURF Install test plug - Open annulus valves 21 :00 - 00:00 3.00 CASE P SURF Test Annular to 250 low 2500 high for 5 mins - Test Pipe rams - Blind rms - Choke manifold - HCR Kill / Choke - Manual Kill 1 Choke - Upper / Lower IBOP - Floor safety valves to 250 low 3500 high for 5 mins each test 11/6/2004 00:00 - 01 :30 1.50 CASE P SURF Con't test BOP's - Perform Accumlulator test - Test good - John Spaulding with AOGCC waived witness of BOP test 01 :30 - 02:00 0.50 CASE P SURF Rig down test equipment - Pull test plug - Install wear ring - Close annulus valves 02:00 - 02:30 0.50 CASE P SURF Moblize BHA to rig floor 02:30 - 04:30 2.00 CASE P SURF Make up 8 3/4" BHA - RIH with 5" HWT - Jars - Surface test MWD GPM 343 @ 740 psi 04:30 - 05:30 1.00 CASE P SURF RIH from 710' to 3880' 05:30 - 06:00 0.50 CASE P SURF Circulate drill pipe vol 8.3 bpm @ 1360 psi 06:00 - 07:00 1.00 CASE P SURF Rig up test equipment - Test casing to 2000 psi for 30 mins 07:00 - 08:30 1.50 DRILL P SURF Drill float collar @ 3894' - Float shoe 3976' - Rat hole to 3988' and 20' new hole to 4008 - 8 bpm @ 1400 psi - 50 RPM TO 5 - WOB5t010 08:30 - 09:30 1.00 CASE P SURF Displ well to 9.2 LSND mud - 8 bpm @ 1270 psi - RPM 50 - TO 5 09:30 - 10:00 0.50 EVAL P SURF FIT - Surface pressure 317 - MW 9.2 - TVD 2910 - MD 3978 = EMW 11.3 Printed: 11/15/2004 9:54:13 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPG-19 MPG-19 ORIG DRILLING DOYON DRILLING INC. DOYON 14 Start: 10/30/2004 Rig Release: 11/11/2004 Rig Number: Spud Date: 11/2/2004 End: 11/6/2004 10:00 - 00:00 14.00 DRILL P INT1 Directional Drill from 4008' to 5696' - WOB 10 to 30 - RPM 80 - TQ on 7to 9 - off 5 - GPM 475 - PP on 3280 - off 3100 - PU 140 - SO 80 - ROT 100 11/7/2004 00:00 - 00:30 0.50 DRILL P INT1 Circ - Clean up hole - Drlg trends increasing - GPM 500 - PP 3050 - RPM 90 - TQ 6.5 00:30 - 04:00 3.50 DRILL P INT1 Directional Drill From 5696' to 6175' - WOB 10 to 20 - RPM 80 - TQ on 8 - off 7 - GPM 500 - PP on 3270 - off 3170 - PU 145 - SO 80 - ROT 105 04:00 - 06:00 2.00 DRILL P INT1 CBU 2 X - GPM 500 - RPM 90 - TQ 7.5 - PP 3200 06:00 - 08:00 2.00 DRILL P INT1 Pump out to shoe from 6175' to 3960' - Pump at 400 gpm 08:00 - 08:30 0.50 DRILL P INT1 CBU 1 X - 425 gpm - @ 2200 psi - RPM 50 - TQ 4 08:30 - 09:30 1.00 DRILL P INT1 Cut drlg line - Rig Service 09:30 - 10:30 1.00 DRILL P INT1 RIH from 3960' to 6175' 10:30 - 11 :30 1.00 DRILL P INT1 Directional Drill from 6175' to 6287' - WOB 10 to 20 - RPM 80 - TQ on 8 - off 7 - GPM 500 - PP on 3270 - off 3170 - PU 145- SO 80 - ROT 105 11 :30 - 12:30 1.00 DRILL N FLUD INT1 Shaker screens blinding off - Max pump rate 3 to 5 bpm @ 500 to 800 psi - Screen down shakers - Circ condition mud 12:30 - 00:00 11.50 DRILL P INT1 Directional Drill from 6287' to 7422' - WOB 5 to 20 - RPM 90 - TQ on 11 - off 9 - GPM 500 - PP on 3850' - off 3650' - PU 180- SO 85 - ROT 115 11/8/2004 00:00 - 12:00 12.00 DRILL P INT1 Directional Drill from 7422' to 8455' - TD 83/4" Hole - WOB 5 to 25 - RPM 90 - TQ on 11 - off 10 - GPM 490 - PP on 3940 - off 3800 - PU 170 - SO 85 - ROT 115 12:00 - 14:30 2.50 CASE P INT1 CBU 3 X - RPM 90 - TQ 9 - GPM 483 - PP 3700 - Flow check - Well static 14:30 - 17:00 2.50 CASE P INT1 Pump out from 8455' to 6082' - Pump at 400 gpm - Flow check - Well static 17:00 - 18:00 1.00 CASE P INT1 RIH from 6082' to 8380' - Precauctionary wash from 8380' to 8455' 18:00 - 20:30 2.50 CASE P INT1 CBU 3 X - RPM 90 - TQ 8.5 - GPM 483 - PP 3570 - Flow check - Well static 20:30 - 00:00 3.50 CASE P INT1 Pump out to shoe from 8455' to 3975 ' - Pump at 400 GPM - No Problems - Flow check - Well static 11/9/2004 00:00 - 00:30 0.50 CASE P INT1 CBU 1 X - GPM 494 - PP 2300 - RPM 40 - TQ 5 - (Lots of cuttings back) - Flow check - Well static - Pump dry job 00:30 - 02:30 2.00 CASE P INT1 POH from 3975' to BHA @ 710' 02:30 - 04:00 1.50 CASE P INT1 Lay down BHA - 5" HWT - Jars - Flex DC's - MWD - Motor - Bit 04:00 - 04:30 0.50 CASE P INT1 Pull wear ring - Install test plug 04:30 - 06:00 1.50 CASE P INT1 Change rams to 7" and test ram doors to 1500 psi- Moblize casg equipmrent to rig floor- 06:00 - 07:00 1.00 CASE P INT1 Held prejob safety meeting on running 7" casing. 07:00 - 11 :00 4.00 CASE P INT1 Made up 7" float equipment and ran in hole slowly monitoring returns and breaking circulation with fill up tool every 25 jts. Ran in hole to 9-5/8" casing shoe at 3978'. 11 :00 - 11 :30 0.50 CASE P INT1 Circulated one casing volume at 5 bpm at 450 psi. PU 145 SO 90 11 :30 - 15:00 3.50 CASE P INT1 Continued running in hole with casing to 8440'. Broke circulation with fill up tool and washed last joint to bottom. PU 245K SO 90K. 15:00 - 16:00 1.00 CASE P INT1 Rigged down fill up tool. Blew down topdrive and rigged up Dowell cementing head and cementing line. Broke circulation Printed: 11/15/2004 9:54:13 AM Legal Well Name: MPG-19 Common Well Name: MPG-19 Spud Date: 11/2/2004 Event Name: ORIG DRILLING Start: 10/30/2004 End: Contractor Name: DOYON DRILLING INC. Rig Release: 11/11/2004 Rig Name: DOYON 14 Rig Number: Date 11/9/2004 I at 2.6 bpm at 470 psi. Attempted to work pipe. Worked pipe up to 300k and down to block weight of 55k. Worked up 350K and . down to 55k. Increased pull up to 400k and down to 55k. Pipe I stuck at 8442.81. 16:00 - 19:30 3.50 CASE P INT1 Increased pump rate to 5.5 bpm at 720 psi and conditioned . hole for cement job. Have full returns. Set all of pipe weight down while circulating. Worked pipe up to 400k every 30 minutes., PJSM on cementing 19:30 - 22:00 2.50 CEMT P INT1 Cement with Schlumberger pump 5 bbls water, test lines with 4,000 psi, pump 25 bbls CoW 100,40 bbls Mud push @ 10.5, drop bottom plug, pump 108 bbls 506 sxs. Class G yield 1.20 I mixed @ 15.8, flush lines, drop top plug, displace with 320 bbls 9.6 brine, didn't bump plug, check cement head top plug was I gone, pressure back up pumped 2 bbls plug pumped, , pressuring up to 1800 psi when pressure got to 1650 psi it broke over, shut down pressure bleed to 950 psi, checked floats they held. we use Weatherford plugs. Think the plug came apart., good return thru out job, cement and displacement was pumped @ 5 bbls min. 100-800 psi, worked pipe thru out cement job but it stayed stuck, no movment. cement in place @ 2200 hrs. 22:00 - 23:00 1.00 CEMT P INT1 Lay down cement head, flush lines and stack with 40 bbls water, blow down kill lines and choke lines 23:00 - 00:00 1.00 CASE P INT1 Nipple down flow lines, service lines, turn buckles, break well head and tubing spool 11/10/2004 00:00 - 01 :00 1.00 CASE P INT1 Pull 290K on 7" csg string, set Csg slips, 240k on slips, Block wt 50K 01 :00 - 02:00 1.00 CASE P INT1 Blow Brine out of landing jt., cut off csg with CIW csg cutter 02:00 - 02:30 0.50 CASE P INT1 Install packoff, RILD 02:30 - 03:30 1.00 CASE P INT1 Nipple up BOPS, test packoff to 4,300 psi 03:30 - 04:30 1.00 CASE P INT1 Change Top rams to 2.875 X 5" 04:30 - 05:00 0.50 CASE P INT1 Rig up, Test top rams 250/3500 psi 5 min. per test 05:00 - 05:30 0.50 CASE P INT1 Pull test plug, Install wear ring 05:30 - 06:00 0.50 CASE P INT1 Pick up BHA # 3 06:00 - 10:00 4.00 CASE P INT1 Pick up 13 jts Drill pipe and trip in to 8,141 tag up on plug, 216 ft high 10:00 - 10:30 0.50 CASE P INT1 Circ @ 8052 with 400 gals min. 2200 psi 10:30 - 11 :30 1.00 CASE P INT1 Rig up and test csg to 2000 psi for 30 min. 11 :30 - 14:30 3.00 CASE N DPRB INT1 POH 14:30 - 15:00 0.50 CASE N DPRB INT1 Lay down BHA # 3 15:00 - 15:30 0.50 CASE N DPRB INT1 Pick up BHA # 4,61/8 bit 6- 4 3/4 DC 15:30 - 18:30 3.00 CASE N DPRB INT1 RIH to 8048 wash to 8141 18:30 - 23:30 5.00 CEMT N DPRB INT1 Drill cement 8141 to 8357' with 10K, 75 rpms, 440 gals per min. 2600 psi, Tq. 6-7k, P/U 150k, S/o 75K, RTW 105K, Vis up 9.6 brine 23:30 - 00:00 0.50 CASE N DPRB INT1 Circ bottoms up, with 75 rpms, 440 gals min., 2600 psi 11/11/2004 00:00 - 01 :00 1.00 CASE N DPRB INT1 Rig up, Test Csg to 3000 psi for 30 min. 01 :00 - 03:00 2.00 CASE N DPRB INT1 Displace well with 30 bbl Hi- Vis pill, 200 bbls sea water, 300 bbls 9.6 Brine, 100 rpms 400-200 gals per min. 03:00 - 04:00 1.00 CASE P INT1 Slip and cut Drilling line, service top drive 04:00 - 04:30 0.50 CASE P INT1 Spot 2 bbls E-P mud lub. 04:30 - 09:30 5.00 CASE P INT1 POH, standing back 40 stands of drill pipe in derrick, laying down excess pipe Printed: 11/15/2004 9:54: 13 AM Legal Well Name: MPG-19 Common Well Name: MPG-19 Event Name: ORIG DRILLING Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 Date I From - To 11/11/20041~9~;~~-¿:30·· 1.00 CASE P I 110:30 - 12:30 2.00 CASE P 112:30 - 13:00 0.50 CASE 13:00 - 13:30 0.50 CASE 113:30 - 14:30 1.00 CASE 14:30 - 17:30 3.00 CASE 117:30 - 19:00 1.50 CASE P 119:00 - 20:30 1.50 CASE P I ! I I Start: 10/30/2004 Rig Release: 11/11/2004 Rig Number: Spud Date: 11/2/2004 End: P P P P INT1 INT1 Rig up to run 3.5 tubing, pull wear ring PJSM, picking up 3.5 9.3# L-80 TC-II tubing kill string, 63 jts to 2047' P/u wt 65K, S/O wt 65K Pick up tubing hanger, land tubing, RILDS Test TWC to 1000 psi, lay down landing jt. Nipple down BOPS Nipple up tubing adapter and CIW 31/8 tree, test metal to metal seals to 5000 psi, shell test tree to 5,000 psi, pull TWC Rig up and freeze protect tubing and annulus with 70 bbls diesel to 2000' Secure Tree, suck out cellar, remove double annulus valve, Rig release for rig move @ 2030 hrs. 11/11/2004 INT1 INT1 INT1 INT1 INT1 INT1 Printed: 11/15/2004 9:54: 13 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPG-19 MPG-19 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES Start: 12/28/2004 Rig Release: 1/1/2005 Rig Number: Spud Date: 11/2/2004 End: 1/1/2005 12/28/2004 00:00 - 02:30 2.50 RIGD P RUNCMP Layover Derrick. Move off Sub Base, Mud Pits, Pipe Shed @ MPC-41. 02:30 - 06:00 3.50 RIGD P RUNCMP Move 4ES to MPG-19i. 06:00 - 10:00 4.00 RIGD P RUNCMP Lay Herculite and Rig Mats. Spot Sub, Pits and Pipe Shed. Raise and Scope Derrick. Spot Camp 10:00 - 13:00 3.00 RIGD P RUNCMP Accep Rig at 10:00 hrs. Take on 9.6 Ib/gal Brine in Pits. Spot Tiger Tank and lay line. Blow steam down line and re-check all connections. Rig up Hard Line to Tree and test. Pick-up Lubricator and pull BPV. Lay down same. 13:00 - 14:30 RUNCMP PJSM with All. Circulate out Diesel Freeze Protect with 9.6 Iblgal Brine. Recycle Diesel to MPU ORT. 14:30 - 15:00 0.50 WHSUR P RUNCMP Set & test TWC 15:00 - 16:00 1.00 WHSUR P RUNCMP N/D tree. 16:00 - 17:30 1.50 BOPSU P RUNCMP N/U DSA & BOPE. 17:30 - 20:30 3.00 BOPSU P RUNCMP R/U test equip. Test BOP as per BP/AOGCC requirements. LP 250 psi, HP 4000 psi. AOGCC notified (24 hr and 3 hr call-outs) of test. No response. 20:30 - 21 :00 RUNCMP Blow down lines. RID test equip. 21 :00 - 22:00 RUNCMP M/U lubricator & pull TWC. UD same. P/U landing jt & M/U into hanger. BOLDS. Pull hanger to floor wi 26K. UD hanger & landing jt. 22:00 - 00:00 RUNCMP POOH & UD 31/2" kill $tring. 12/29/2004 00:00 - 00:30 RUNCMP Finish POOH & UD 31/2" kill string. Recovered 64 jts TCII tubing, X nipple & WLEG. 00:30 - 01 :30 RUNCMP Clear & clean rig floor. Prepare to P/U 3 1/2" DP. Schlumberger TCP service is unavailable, committed to job on Rig 9. 01 :30 - 07:30 6.00 RUNCMP P/U muleshoe on 31/2" DP & RIH 1x1. 07:30 - 09:30 2.00 RUNCMP SWS Gun Hand arrives on location from Rig 9 Job. TOH with 31/2" Drill Pipe and stand back in Derrick (71 Stds). 09:30 - 10:00 0.50 RUNCO RUNCMP Clear and Clean Floor. Load Guns in Pipe Shed in proper order. Rig up to handle 41/2" Guns. 1 0:00 - 12:00 2.00 RUNCO RUNCMP P/U handling tools for TCP equip. Hold PJSM wi all hands on TCP gun safety. M/U TCP guns & RIH. 12:00 - 16:00 4.00 RUNCO RUNCMP TIH wi stands of 31/2" DP to 7340'. P/U singljts of 31/2" Dp to 8238'. 16:00 - 17:00 1.00 RUNCO RUNCMP Wait on Schlumberger personnel. 17:00 - 19:00 2.00 RUNCO RUNCMP R/U E-line equip. 19:00 - 19:30 0.50 RUNCO RUNCMP RIH wi CCUGr tool to 2000'. Check tool, has short, not working. POOH. 19:30 - 20:30 1.00 RUNCO RUNCMP Repair tool & check same. 20:30 - 23:00 2.50 RUNCO RUNCMP RIH wi CCUGR. Correlate depth of guns. Space out DP. 23:00 - 00:00 1.00 RUNCO RUNCMP PJSM. Fire guns. Took 12 min to fire after pressuring up to 2500 psi. Good indication on surface. Perf'ed 7650-7680', 7783-7823',8004-8024',8040-8080',8183-8213'. All intervals shot 5 spf. Fluid level dropped. Circulate bottoms up. 12/30/2004 00:00 - 00:30 0.50 RUNCO RUNCMP Finish circulating bottoms up. 5 BPM @ 1000 psi. Pumped 335 Bbbls. Lost 20 Bbls while CBU. Had some gas to surface from guns firing. 00:30 - 03:30 3.00 RUNCO RUNCMP POOH wi TCP guns & stand back 3 1/2" DP. 03:30 - 04:00 0.50 RUNCO RUNCMP Hold PJSM wi all hands on laying down guns safely. R/U to UD TCP guns & equip. 04:00 - 12:00 8.00 RUNCO RUNCMP Break out & UD TCP guns. All shots fired but one shot. See Printed: 1/4/200S 9:S3:03 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From MPG-19 MPG-19 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES Start: 12/28/2004 Rig Release: 1/1/2005 Rig Number: Spud Date: 11/2/2004 End: 1/1/2005 12/30/2004 ---_.-- 12:00 - 12:30 12:30 - 15:30 15:30 - 18:00 2.50 RUNCO 118:00 - 19:30 1.50 RUNCO 19:30 - 00:00 4.50 RUNCO 12/31/2004 00:00 - 01 :00 1.00 RUNCO 01 :00 - 03:00 2.00 RUNCO 03:00 - 03:30 0.50 RUNCO 03:30 - 05:00 1.50 RUNCO 05:00 - 05:30 0.50 RUNCO 05:30 - 20:30 15.00 RUNCO 20:30 - 21 :00 0.50 RUNCO 21 :00 - 23:00 2.00 RUNCO 23:00 - 00:00 1.00 RUNCO 1/1/2005 00:00 - 00:30 0.50 RUNCO 00:30 - 02:00 1.50 RUNCO 02:00 - 02:30 0.50 RUNCO 02:30 - 05:30 3.00 RUNCO 05:30 - 10:30 5.00 RUNCO RUNCMP î remarks section. An excessive amount of time was required to Ilay down Guns due to the LARGE volume of a EP Mud Lube II type product left in the Wellbore from the Drilling Rig (???). Guns had to be steam cleaned. Also had to becareful of ! "trapped pressure" due to the thick fluid inside all Guns. Rig I Floor also had to be cleaned up several times RUNCMP '[ Make-up BHA #1 as follows: 6 1/8" Bit, 2 ea Boot Baskets, Casing Scraper, Bit Box, Jars. RUNCMP I! TIH with BHA and 263 Jts 3 1/2" Drill Pipe. Tagged PBTD at 8,357'. RUNCMP Reverse Circulate at 3 bpm/500 psi. No fluid loss. Increase rate to 5 bpm/1000 psi. RUNCMP Cut & slip 84' of drilling line. RUNCMP POOH & UD 3 1/2" DP. RUNCMP Finish POOH & UD 31/2" DP, bit, scraper, jars & junk baskets. 10:30 - 11 :30 11 :30 - 12:30 12:30 - 13:00 13:00 - 00:00 1.00 RUNCO 1.00 RUNCO 0.50 RUNCO 11.00 RIGD P 'RUNCMP Clear & clean rig floor. R/U completion tools & torq turn equip. RUNCMP Hold PJSM. Review completion running order & procedure. RUNCMP M/U tailpipe assy & packer assys & RIH. RUNCMP Hang blocks & tighten wraps on drum. RUNCMP Con't to RIH w/3 1/2" completion. Ran total of 247 jts 3 1/2' tubing. torq turned all connections to opt. of 2300 ft-Ibs. RUNCMP M/U tubing hanger & landing jt. Land completion string. RILDS, I UD landing jt. P/U Wt = 52K, S/O Wt = 35K. RUNCMP Set & test TWC. Blow down lines. Drain BOP stack. Clear & clean rig floor. RUNCMP N/D BOPE. RUNCMP Finish N/D BOPE. RUNCMP N/U adapter flange & tree. Test same to 5000 psi, OK. RUNCMP P/U lubricator & pull TWC. UD lubricator. R/U hot oilers. RUNCMP Hold PJSM. Test lines to 4200 psi. Displace well down annulus w/ 90 Bbls of hot 9.6 ppg Brine. Pump 2.1 BPM @ 750 psi. Displace well w/200 Bbls of heated inhibited 9.6 ppg Brine. RUNCMP Drop Roller Setting Ball/Rod to set Packer. WO Setting Ball/Rod to fall. Bring Pump on line to pressure up and set Packers... No-Joy. Wait again. Pump again...still No-Joy. Dropped a Roller Blind/Box to knock Setting Ball/Rod down hole. Wait 30 minutes. Bring Pump on line and pressure up...with Joy. Set Packers a test tubing at 4,000 psi/30 Mins. Bleed tubing pressure down to 2,000 psi and shut in. Pressure test Annulus to 4,000 psi/30 mins. Bleed Tubing down until DCK-SV sheared. Recorded tests on chart. RUNCMP Freeze Protect Well with 80 bbls diesel. Rig down Lil' Red. RUNCMP Blow down Lines. rig down same. RUNCMP Secure Cellar. Prep to rig down. Released rig at 13:00 hrs. RUNCMP Lower and layover Derrick. RDMO. Printed: 1/4/200S 9:S3:03 AM 11/6/2004 FIT Test Depth (TMD) 3,978.0 (ft) Test Depth (TVD) 2,910.0 (ft) AMW 9.20 (ppg) Surface Pressure 317 (psi) I Leak Off Pressure (BHP) I I 1,708 (psi) I Page 1 of 1 EMW 11.30 (ppg) ( Printed: 11/15/2004 9:54:07 AM Halliburton Sperry-Sun Milne Point Unit BPXA MPG-19 Job No. AKZZ3361723, Surveyed: 8 November, 2004 Survey Report 29 November, 2004 Your Ref: API 500292322800 Surface Coordinates: 6014011.83 N, 557269.08 E (70026' 56.0965" N, 149031' 58.0485" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Kelly Bushing Elevation: 63.74ft above Mean Sea Level SP'E!r-'r-'V-5UI! CA'ILLING seRVices A Halliburton Company DEFINITI E Survey Ref: svy1501 DrillQuest 3.03.06.006 Page 2 of5 29 November, 2004 - 15:44 Halliburton Sperry-Sun Survey Report for MPG-19 Your Ref: API 500292322800 Job No. AKZZ3361723, Surveyed: 8 November, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 0.00 0.000 0.000 -63.74 0.00 0.00 N 0.00 E 6014011.83 N 557269.08 E 0.00 BP High Accuracy Gyro - GYO-C OMS 112.00 0.250 311.120 48.26 112.00 0.16 N 0.18W 6014011.99 N 557268.89 E 0.223 -0.13 171.00 0.110 327.370 107.26 171.00 0.29 N 0.31 W 6014012.12 N 557268.77 E 0.250 -0.21 259.00 0.210 289.240 195.26 259.00 0.42 N 0.51 W 6014012.24 N 557268.57 E 0.160 -0.36 ( 357.00 0.560 128.650 293.26 357.00 0.18 N 0.30W 6014012.01 N 557268.77 E 0.777 -0.24 442.00 2.640 132.080 378.22 441.96 1.39 S 1.47 E 6014010.45 N 557270.56 E 2.449 0.98 MWO+IIFR+MS 560.15 5.980 128.830 496.02 559.76 7.08 S 8.29 E 6014004.82 N 557277.42 E 2.833 5.74 621.79 7.490 117.380 557.23 620.97 10.94 S 14.36 E 6014001.00 N 557283.52 E 3.267 10.34 649.79 8.180 109.700 584.97 648.71 12.45 S 17.85 E 6013999.52 N 557287.03 E 4.473 13.21 747.83 9.150 103.820 681.90 745.64 16.66 S 31.99 E 6013995.41 N 557301.20 E 1.339 25.39 795.84 8.620 104.180 729.33 793.07 18.46 S 39.19 E 6013993.67 N 557308.41 E 1.110 31.70 845.09 8.930 103.450 778.00 841.74 20.25 S 46.48 E 6013991.94 N 557315.72 E 0.669 38.10 891.90 9.690 103.840 824.20 887.94 22.04 S 53.84 E 6013990.21 N 557323.09 E 1.629 44.57 940.77 11 .400 103.810 872.24 935.98 24.17 S 62.52 E 6013988.14 N 557331.79 E 3.499 52.19 1034.93 12.720 91.390 964.33 1028.07 26.65 S 81.93 E 6013985.81 N 557351.21 E 3.084 69.91 1134.24 13.170 86.610 1061 .12 1124.86 26.24 S 104.15 E 6013986.39 N 557373.43 E 1.169 91.20 1229.37 14.020 72.890 1153.61 1217.35 22.21 S 125.99 E 6013990.59 N 557395.24 E 3.497 113.23 1324.98 15.060 66.780 1246.16 1309.90 13.91 S 148.48 E 6013999.06 N 557417.66 E 1.937 137.18 1420.93 19.000 67.970 1337.89 1401.63 3.13 S 174.42E 6014010.04 N 557443.52 E 4.122 165.17 1516.06 21.210 70.080 1427.22 1490.96 8.54 N 204.96 E 6014021.95 N 557473.97 E 2.445 197.82 1612.46 22.420 68.790 1516.71 1580.45 21.14 N 238.49 E 6014034.80 N 557507.40 E 1.350 233.59 ( 1708.70 22.830 70.780 1605.55 1669.29 33.92 N 273.23 E 6014047.85 N 557542.04 E 0.902 270.58 1803.84 25.750 71.320 1692.26 1756.00 46.62 N 310.25 E 6014060.83 N 557578.96 E 3.078 309.70 1899.48 27.390 68.680 1777.80 1841.54 61.27 N 350.43 E 6014075.80 N 557619.03 E 2.113 352.43 1995.35 31 .440 67.210 1861.29 1925.03 78.99 N 394.04 E 6014093.84 N 557662.50 E 4.291 399.37 2090.75 33.660 67.380 1941 .70 2005.44 98.79 N 441.39 E 6014114.01 N 557709.70 E 2.329 450.50 2186.72 40.270 67.430 2018.34 2082.08 120.95 N 494.64 E 6014136.58 N 557762.77 E 6.888 507.97 2283.52 43.280 66.560 2090.52 2154.26 146.17 N 553.99 E 6014162.25 N 557821.93 E 3.167 572.18 2379.09 48.300 68.090 2157.14 2220.88 172.53 N 617.19 E 6014189.10 N 557884.92 E 5.376 640.41 2475.26 48.140 67.360 2221.22 2284.96 199.71 N 683.55 E 6014216.79 N 557951.07 E 0.590 711.90 Halliburton Sperry-Sun Survey Report for MPG-19 Your Ref: API 500292322800 Job No. AKZZ3361723, Surveyed: 8 November, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 2572.15 52.820 68.110 2282.86 2346.60 228.01 N 752.70 E 6014245.61 N 558020.01 E 4.867 786.38 2667.55 55.480 70.330 2338.73 2402.47 255.41 N 824.99 E 6014273.57 N 558092.09 E 3.366 863.59 2764.09 62.880 72.130 2388.16 2451.90 282.02 N 903.45 E 6014300.78 N 558170.33 E 7.830 946.42 2860.15 66.390 71.670 2429.30 2493.04 308.99 N 985.94 E 6014328.38 N 558252.61 E 3.679 1033.20 2956.62 67.250 68.580 2467.28 2531.02 339.14 N 1069.32 E 6014359.18 N 558335.76 E 3.076 1121.81 ( 3052.99 66.560 67.560 2505.08 2568.82 372.24 N 1151.55E 6014392.91 N 558417.74 E 1.209 1210.22 3148.24 67.830 64.420 2542.01 2605.75 407.97 N 1231.74 E 6014429.26 N 558497.65 E 3.318 1297.48 3245.52 67.680 64.710 2578.84 2642.58 446.65 N 1313.05E 6014468.55 N 558578.66 E 0.316 1386.71 3340.01 67.880 62.900 2614.57 2678.31 485.26 N 1391.54 E 6014507.77 N 558656.85 E 1.786 1473.22 3436.21 67.800 61.760 2650.86 2714.60 526.63 N 1470.44 E 6014549.74 N 558735.43 E 1.101 1560.98 3532.67 68.220 61.960 2686.98 2750.72 568.81 N 1549.31 E 6014592.53 N 558813.97 E 0.476 1648.95 3627.32 69.130 62.580 2721.40 2785.14 609.84 N 1627.35 E 6014634.15 N 558891.70 E 1.139 1735.79 3723.40 69.140 62.130 2755.62 2819.36 651.49 N 1706.88 E 6014676.42 N 558970.91 E 0.438 1824.23 3819.50 69.280 62.010 2789.73 2853.4 7 693.57 N 1786.26 E 6014719.11 N 559049.96 E 0.187 1912.65 3915.86 69.190 62.260 2823.89 2887.63 735.69 N 1865.91 E 6014761.83 N 559129.29 E 0.260 2001 .35 3930.42 68.880 62.180 2829.10 2892.84 742.02 N 1877.94 E 6014768.26 N 559141.27 E 2.190 2014.74 4006.93 67.330 62.440 2857.63 2921.37 775.01 N 1940.80 E 6014801.73 N 559203.87 E 2.050 2084.66 4102.71 69.650 63.530 2892.75 2956.49 815.48 N 2020.18 E 6014842.81 N 559282.94 E 2.643 2172.60 4197.92 69.110 63.410 2926.28 2990.02 855.28 N 2099.91 E 6014883.22 N 559362.36 E 0.579 2260.66 4294.14 67.500 64.600 2961.85 3025.59 894.47 N 2180.26 E 6014923.03 N 559442.41 E 2.030 2349.13 4388.70 69.370 62.720 2996.61 3060.35 933.49 N 2259.06 E 6014962.65 N 559520.90 E 2.707 2436.07 4483.48 69.050 62.990 3030.25 3093.99 973.92 N 2337.91 E 6015003.68 N 559599.44 E 0.430 2523.49 4579.56 69.740 62.560 3064.06 3127.80 1015.06 N 2417.88 E 6015045.44 N 559679.09 E 0.831 2612.20 4675.59 69.550 62.310 3097.46 3161.20 1056.73 N 2497.69 E 6015087.72 N 559758.58 E 0.314 2700.91 4771.06 69.700 61.770 3130.70 3194.44 1098.69 N 2576.74 E 6015130.28 N 559837.30 E 0.553 2788.98 4867.94 69.700 62.580 3164.31 3228.05 1141.10N 2657.10 E 6015173.31 N 559917.33 E 0.784 2878.44 4963.89 69.480 62.210 3197.78 3261.52 1182.77 N 2736.79 E 6015215.59 N 559996.70 E 0.428 2967.04 5059.35 69.500 62.040 3231.22 3294.96 1224.57 N 2815.82 E 6015258.00 N 560075.41 E 0.168 3055.05 5155.49 69.290 61.580 3265.06 3328.80 1267.08 N 2895.14 E 6015301.12 N 560154.40 E 0.498 3143.55 5251.64 68.530 63.670 3299.66 3363.40 1308.33 N 2974.79 E 6015342.98 N 560233.73 E 2.177 3231.99 5346.40 67.670 63.400 3335.00 3398.74 1347.51 N 3053.50 E 6015382.77 N 560312.14 E 0.945 3318.89 5442.29 68.910 63.240 3370.47 3434.21 1387.51 N 3133.10 E 6015423.38 N 560391.43 E 1.302 3406.89 5538.50 68.930 63.940 3405.08 3468.82 1427.44 N 3213.50 E 6015463.92 N 560471.52 E 0.679 3495.64 5631.73 69.440 63.850 3438.20 3501.94 1465.79 N 3291.76 E 6015502.87 N 560549.48 E 0.554 3581.86 5730.03 69.070 63.340 3473.02 3536.76 1506.67 N 3374.10 E 6015544.38 N 560631.50 E 0.614 3672.73 29 November, 2004 - 15:44 Page 3 of 5 Dri/lQuest 3.03.06.006 HalJiburlon Sperry-Sun Survey Report for MPG-19 Your Ref: API 500292322800 Job No. AKZZ3361723, Surveyed: 8 November, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Inct. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 5824.38 69.420 64.220 3506.46 3570.20 1545.65 N 3453.24 E 6015583.97 N 560710.35 E 0.948 3759.99 5921.17 69.680 64.220 3540.28 3604.02 1585.09 N 3534.91 E 6015624.04 N 560791.70 E 0.269 3849.79 6016.10 70.030 63.760 3572.97 3636.71 1624.17N 3615.00 E 6015663.73 N 560871.50 E 0.586 3937.99 6111.99 68.280 62.790 3607.09 3670.83 1664.47 N 3695.04 E 6015704.64 N 560951.22 E 2.055 4026.50 6209.27 68.240 62.670 3643.12 3706.86 1705.87 N 3775.36 E 6015746.66 N 561031.22 E 0.122 4115.61 6303.47 68.590 63.190 3677.78 3741.~2 1745.73 N 3853.36 E 6015787.12 N 561108.91 E 0.634 4202.05 6399.34 69.300 66.960 3712.23 3775.97 1783.42 N 3934.48 E 6015825.43 N 561189.74 E 3.744 4290.79 6495.60 68.900 69.170 3746.57 3810.31 1817.01 N 4017.89 E 6015859.66 N 561272.89 E 2.185 4380.47 6591.75 69.760 72.790 3780.52 3844.26 1846.32 N 4102.92 E 6015889.62 N 561357.69 E 3.634 4470.39 6687.85 68.440 75.910 3814.81 3878.55 1870.54 N 4189.35 E 6015914.51 N 561443.93 E 3.329 4560.09 6783.19 68.970 80.340 3849.45 3913.19 1888.81 N 4276.25 E 6015933.44 N 561530.69 E 4.365 4648.43 6880.40 69.080 83.370 3884.26 3948.00 1901.67 N 4366.09 E 6015946.99 N 561620.43 E 2.913 4737.92 6976.19 68.650 87.500 3918.81 3982.55 1908.78 N 4455.13 E 6015954.79 N 561709.41 E 4.046 4824.89 7070.34 67.580 90.340 3953.91 4017.65 1910.43N 4542.47 E 6015957.11 N 561796.73 E 3.021 4908.58 7166.84 67.640 90.050 3990.67 4054.41 1910.13 N 4631.69 E 6015957.49 N 561885.96 E 0.285 4993.46 7263.11 67.500 93.610 4027.41 4091.15 1907.29 N 4720.62 E 6015955.34 N 561974.90 E 3.421 5077.29 7359.37 67.990 94.000 4063.86 4127.60 1901.38 N 4809.51 E 6015950.11 N 562063.84 E 0.632 5160.16 7455.04 68.630 92.840 4099.22 4162.96 1896.08 N 4898.24 E 6015945.49 N 562152.61 E 1.310 5243.06 7550.21 68.500 92.360 4134.00 4197.74 1892.06 N 4986.74 E 6015942.15 N 562241.13 E 0.489 5326.12 7646.27 68.040 93.090 4169.57 4233.31 1887.82 N 5075.87 E 6015938.59 N 562330.30 E 0.853 5409.72 7741.28 67.700 92.790 4205.36 4269.10 1883.30 N 5163.77 E 6015934.76 N 562418.22 E 0.462 5492.06 7838.85 68.310 92.980 4241.90 4305.64 1878.75 N 5254.12 E 6015930.90 N 562508.61 E 0.651 5576.73 ( 7933.96 68.250 92.180 4277.10 4340.84 1874.77 N 5342.39 E 6015927.60 N 562596.90 E 0.784 5659.59 8029.47 67.660 91.840 4312.95 4376.69 1871.67N 5430.86 E 6015925.17 N 562685.40 E 0.700 5742.91 8125.31 66.910 92.200 4349.96 4413.70 1868.55 N 5519.21 E 6015922.74 N 562773.77 E 0.856 5826.11 8219.17 66.760 93.200 4386.88 4450.62 1864.49 N 5605.41 E 6015919.33 N 562859.99 E 0.992 5906.97 8313.29 65.950 92.430 4424.63 4488.37 1860.25 N 5691.52 E 6015915.76 N 562946.14 E 1.141 5987.70 8392.71 65.560 92.510 4457.24 4520.98 1857.13 N 5763.87 E 6015913.19 N 563018.50 E 0.500 6055.65 8455.00 65.560 92.510 4483.01 4546.75 1854.65 N 5820.52 E 6015911.15N 563075.18 E 0.000 6108.85 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 72.260° (True). 29 November, 2004 - 15:44 Page 4 of 5 DrillQuest 3.03.06.006 Halliburton Sperry-Sun Survey Report for MPG-19 Your Ref: API 500292322800 Job No. AKZZ3361723, Surveyed: 8 November, 2004 BPXA Milne Point Unit Based upon Minimum Curvature type calculations, at a Measured Depth of 8455.00ft., The Bottom Hole Displacement is 61 08.86ft., in the Direction of 72.326° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 8455.00 4546.75 1854.65 N 5820.52 E Projected Survey Survey toollJroQram for MPG-19 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 442.00 0.00 441.96 442.00 8455.00 441.96 BP High Accuracy Gyro - GYD-CT-DMS 4546.75 MWD+/lFR+MS ( 29 November, 2004 - 15:44 Page 5 of 5 DrillQuest 3.03.06.006 Halliburton Sperry-Sun Milne Point Unit BPXA MPG-19 MWD Job No. AKMW3361723, Surveyed: 8 November, 2004 Survey Report 29 November, 2004 Your Ref: API 500292322800 Surface Coordinates: 6014011.83 N, 557269.08 E (70026' 56.0965" N, 149031' 58.0485" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Kelly Bushing Elevation: 63.74ft above Mean Sea Level ( =p:E!!:r"'r"')J-SUI! DR ILL ING .'$1$ A V [ c: e 5 A Halliburton Company Survey Ref: svy1503 DrillQuest 3.03.06.006 Page 2 of5 29 November, 2004 - 15:44 Halliburton Sperry-Sun Survey Report for MPG-19 MWD Your Ref: API 500292322800 Job No. AKMW3361723, Surveyed: 8 November, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 0.00 0.000 0.000 -63.74 0.00 0.00 N 0.00 E 6014011.83 N 557269.08 E 0.00 BP High Accuracy Gyro - GYO-C1 OMS 112.00 0.250 311 .120 48.26 112.00 0.16 N 0.18W 6014011.99 N 557268.89 E 0.223 -0.13 171.00 0.110 327.370 107.26 171.00 0.29 N 0.31 W 6014012.12 N 557268.77 E 0.250 -0.21 259.00 0.210 289.240 195.26 259.00 0.42 N 0.51 W 6014012.24 N 557268.57 E 0.160 -0.36 357.00 0.560 128.650 293.26 357.00 0.18 N 0.30W 6014012.01 N 557268.77 E 0.777 -0.24 442.00 2.640 132.080 378.22 441.96 1.39 S 1.47 E 6014010.45 N 557270.56 E 2.449 0.98 MWO Magnetic 560.15 5.980 129.180 496.02 559.76 7.11 S 8.26 E 6014004.79 N 557277.40 E 2.832 5.71 621.79 7.490 117.660 557.23 620.97 11.00 S 14.31 E 6014000.94 N 557283.48 E 3.276 10.28 649.79 8.180 109.990 584.97 648.71 12.53 S 17.80 E 6013999.44 N 557286.98 E 4.469 13.14 747.83 9.150 104.070 681.90 745.64 16.81 S 31.92 E 6013995.27 N 557301.13 E 1.343 25.28 795.84 8.620 104.410 729.33 793.07 18.63 S 39.11 E 6013993.50 N 557308.33 E 1.109 31.57 845.09 8.930 103.450 778.00 841 .74 20.44 S 46.40 E 6013991.75 N 557315.63 E 0.696 37.96 891.90 9.690 104.080 824.20 887.94 22.24 S 53.75 E 6013990.00 N 557323.00 E 1.638 44.42 940.77 11 .400 104.010 872.24 935.98 24.41 S 62.43 E 6013987.90 N 557331.69 E 3.499 52.02 1034.93 12.720 91.720 964.33 1028.07 26.98 S 81.82 E 6013985.48 N 557351.11 E 3.058 69.71 1134.24 13.170 87.000 1061.12 1124.86 26.71 S 104.05 E 6013985.92 N 557373.33 E 1.157 90.96 1229.37 14.020 73.270 1153.61 1217.35 22.83 S 125.91 E 6013989.97 N 557395.17 E 3.499 112.97 1324.98 15.060 66.860 1246.16 1309.90 14.61 S 148.43 E 6013998.36 N 557417.62 E 2.002 136.92 1420.93 19.000 68.210 1337.89 1401.63 3.91 S 174.41 E 6014009.26 N 557443.51 E 4.127 164.92 1516.06 21.210 70.340 1427.22 1490.96 7.63 N 204.99 E 6014021.03 N 557474.01 E 2.447 197.57 1612.46 22.420 68.520 1516.71 1580.45 20.23 N 238.52 E 6014033.89 N 557507.44 E 1 .438 233.34 ( 1708.70 22.830 70.560 1605.55 1669.29 33.16 N 273.21 E 6014047.09 N 557542.03 E 0.920 270.32 1803.84 25.750 70.950 1692.26 1756.00 46.05 N 310.16 E 6014060.26 N 557578.87 E 3.074 309.44 1899.48 27.390 68.430 1777.80 1841.54 60.92 N 350.26 E 6014075.44 N 557618.86 E 2.080 352.16 1995.35 31 .440 66.820 1861.29 1925.03 78.88 N 393.77 E 6014093.73 N 557662.23 E 4.304 399.08 2090.75 33.660 67.080 1941.70 2005.44 98.97 N 441.00 E 6014114.19 N 557709.30 E 2.332 450.18 2186.72 40.270 66.650 2018.34 2082.08 121 .65 N 494.03 E 6014137.27 N 557762.16 E 6.893 507.60 2283.52 43.280 65.930 2090.52 2154.26 147.59 N 553.06 E 6014163.66 N 557820.99 E 3.149 571.73 2379.09 48.300 67.120 2157.14 2220.88 174.84 N 615.89 E 6014191.39 N 557883.60 E 5.328 639.87 2475.26 48.140 66.810 2221.22 2284.96 202.90 N 681.88 E 6014219.96 N 557949.38 E 0.292 711.28 Halliburton Sperry-Sun Survey Report for MPG-19 MWD Your Ref: API 500292322800 Job No. AKMW3361723, Surveyed: 8 November, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 2572.15 52.820 68.420 2282.86 2346.60 231.32 N 750.98 E 6014248.91 N 558018.26 E 4.997 785.75 2667.55 55.480 70.700 2338.73 2402.47 258.29 N 823.43 E 6014276.44 N 558090.50 E 3.395 862.98 2764.09 62.880 71.900 2388.16 2451.90 284.82 N 901.92 E 6014303.58 N 558168.78 E 7.739 945.82 2860.15 66.390 71.230 2429.30 2493.04 312.28 N 984.25 E 6014331.66 N 558250.90 E 3.708 1032.59 2956.62 67.250 68.250 2467.28 2531.02 342.99 N 1067.43 E 6014363.01 N 558333.84 E 2.976 1121.18 3052.99 66.560 67.630 2505.08 2568.82 376.28 N 1149.58 E 6014396.93 N 558415.74 E 0.929 1209.57 3148.24 67.830 63.750 2542.01 2605.75 412.43 N 1229.57 E 6014433.69 N 558495.45 E 3.985 1296.77 3245.52 67.680 65.060 2578.84 2642.58 451.33 N 1310.78 E 6014473.21 N 558576.35 E 1.256 1385.97 3340.01 67.880 62.810 2614.58 2678.32 489.76 N 1389.35 E 6014512.25 N 558654.62 E 2.214 1472.51 3436.21 67.800 61.980 2650.87 2714.61 531.04 N 1468.30 E 6014554.14 N 558733.25 E 0.803 1560.29 3532.67 68.220 61.840 2686.98 2750.72 573.16 N 1547.20 E 6014596.86 N 558811.83 E 0.456 1648.27 3627.32 69.130 62.670 2721 .40 2785.14 614.20 N 1625.24 E 6014638.50 N 558889.55 E 1.262 1735.10 3723.40 69.140 62.350 2755.63 2819.37 655.64 N 1704.88 E 6014680.55 N 558968.87 E 0.311 1823.58 3819.50 69.280 61.990 2789.74 2853.48 697.58 N 1784.33 E 6014723.11 N 559048.00 E 0.379 1912.03 3915.86 69.190 62.070 2823.90 2887.64 739.84 N 1863.91 E 6014765.97 N 559127.25 E 0.121 2000.70 3930.42 68.880 62.450 2829.11 2892.85 746.17 N 1875.94 E 6014772.39 N 559139.23 E 3.236 2014.09 4006.93 67.330 62.600 2857.64 2921.38 778.92 N 1938.92 E 6014805.63 N 559201.96 E 2.034 2084.06 4102.71 69.650 63.680 2892.76 2956.50 819.17 N 2018.41 E 6014846.49 N 559281.14 E 2.640 2172.04 4197.92 69.110 63.550 2926.29 2990.03 858.77 N 2098.24 E 6014886.70 N 559360.66 E 0.581 2260.13 4294.14 67.500 64.600 2961.85 3025.59 897.86 N 2178.64 E 6014926.41 N 559440.76 E 1.956 2348.62 4388.70 69.370 62.960 2996.61 3060.35 936.72 N 2257.52 E 6014965.87 N 559519.34 E 2.552 2435.59 4483.48 69.050 62.950 3030.25 3093.99 977.01 N 2336.44 E 6015006.77 N 559597.95 E 0.338 2523.04 ( 4579.56 69.740 62.830 3064.07 3127.81 1017.99 N 2416.49 E 6015048.36 N 559677.68 E 0.728 2611.77 4675.59 69.550 62.560 3097.47 3161.21 1059.29 N 2496.50 E 6015090.28 N 559757.36 E 0.330 2700.55 4771.06 69.700 61.990 3130.71 3194.45 1100.93N 2575.72 E 6015132.52 N 559836.26 E 0.581 2788.69 4867.94 69.700 62.750 3164.32 3228.06 1143.07 N 2656.22 E 6015175.28 N 559916.44 E 0.736 2878.20 4963.89 69.480 62.450 3197.78 3261.52 1184.45 N 2736.05 E 6015217.27 N 559995.95 E 0.372 2966.85 5059.35 69.500 62.220 3231.23 3294.97 1225.97 N 2815.24 E 6015259.39 N 560074.82 E 0.227 3054.92 5155.49 69.290 61.850 3265.06 3328.80 1268.16 N 2894.72 E 6015302.20 N 560153.97 E 0.421 3143.48 5251.64 68.530 63.800 3299.66 3363.40 1309.14 N 2974.52 E 6015343.78 N 560233.46 E 2.051 3231.97 5346.40 67.670 63.620 3335.01 3398.75 1348.08 N 3053.35 E 6015383.33 N 560311.98 E 0.925 3318.92 5442.29 68.910 63.540 3370.48 3434.22 1387.72 N 3133.13 E 6015423.58 N 560391.46 E 1.295 3406.98 5538.50 68.930 64.110 3405.08 3468.82 1427.32 N 3213.70 E 6015463.80 N 560471.72 E 0.553 3495.78 5631.73 69.440 64.150 3438.21 3501.95 1465.34 N 3292.11 E 6015502.42 N 560549.83 E 0.549 3582.05 5730.03 69.070 63.580 3473.03 3536.77 1505.83 N 3374.64 E 6015543.55 N 560632.05 E 0.660 3672.99 29 November, 2004 - 15:44 Page 3 of 5 DrillQuest 3.03.06.006 Halliburton Sperry-Sun Survey Report for MPG-19 MWD Your Ref: API 500292322800 Job No. AKMW3361723, Surveyed: 8 November, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 5824.38 69.420 64.510 3506.46 3570.20 1544.44 N 3453.97 E 6015582.77 N 560711.08 E 0.994 3760.31 5921.17 69.680 64.510 3540.28 3604.02 1583.47 N 3535.83 E 6015622.43 N 560792.64 E 0.269 3850.18 6016.10 70.030 64.170 3572.97 3636.71 1622.07 N 3616.16E 6015661.63 N 560872.67 E 0.499 3938.45 6111.99 68.280 62.940 3607.10 3670.84 1661.97N 3696.39 E 6015702.15 N 560952.59 E 2.183 4027.03 6209.27 68.240 62.320 3643.13 3706.87 1703.51 N 3776.64 E 6015744.31 N 561032.52 E 0.593 4116.11 6303.47 68.590 62.380 3677.78 3741.52 1744.16 N 3854.23 E 6015785.55 N 561109.79 E 0.376 4202.40 6399.34 69.300 66.340 3712.24 3775.98 1782.86 N 3934.87 E 6015824.87 N 561190.14 E 3.925 4291.00 6495.60 68.900 67.910 3746.58 3810.32 1817.81 N 4017.72 E 6015860.46 N 561272.72 E 1.579 4380.56 6591.75 69.760 72.610 3780.53 3844.27 1848.18 N 4102.37 E 6015891.47 N 561357.13 E 4.660 4470.43 6687.85 68.440 75.920 3814.82 3878.56 1872.53 N 4188.76 E 6015916.49 N 561443.33 E 3.498 4560.14 6783.19 68.970 80.780 3849.47 3913.21 1890.45 N 4275.73 E 6015935.08 N 561530.16 E 4.782 4648.43 6880.40 69.080 84.840 3884.28 3948.02 1901.81 N 4365.76 E 6015947.13 N 561620.10 E 3.901 4737.64 6976.19 68.650 90.970 3918.84 3982.58 1905.08 N 4454.99 E 6015951.09 N 561709.30 E 5.985 4823.63 7070.34 67.580 92.110 3953.94 4017.68 1902.74 N 4542.32 E 6015949.41 N 561796.65 E 1.598 4906.09 7166.84 67.640 91 .560 3990.70 4054.44 1899.88 N 4631.50 E 6015947.24 N 561885.85 E 0.531 4990.16 7263.11 67.500 97.730 4027.46 4091.20 1892.68 N 4720.14 E 6015940.72 N 561974.54 E 5.926 5072.39 7359.37 67.990 95.340 4063.92 4127.66 1882.54 N 4808.65 E 6015931.27 N 562063.12 E 2.354 5153.60 7455.04 68.630 94.000 4099.28 4163.02 1875.31 N 4897.24 E 6015924.72 N 562151.77 E 1 .463 5235.78 7550.21 68.500 93.930 4134.06 4197.80 1869.18N 4985.62 E 6015919.27 N 562240.19 E 0.153 5318.08 7646.27 68.040 92.640 4169.62 4233.36 1864.07 N 5074.70 E 6015914.84 N 562329.31 E 1.336 5401.37 7741.28 67.700 91.720 4205.42 4269.16 1860.72 N 5162.65 E 6015912.17 N 562417.28 E 0.966 5484.12 7838.35 68.310 92.870 4241.77 4305.51 1857.11 N 5252.58 E 6015909.25 N 562507.23 E 1.266 5568.67 7933.96 68.250 92.110 4277.16 4340.90 1853.26 N 5341.32 E 6015906.07 N 562596.00 E 0.741 5652.02 8029.47 67.660 92.170 4313.00 4376.74 1849.95 N 5429.78 E 6015903.45 N 562684.49 E 0.620 5735.27 8125.31 66.910 92.070 4350.01 4413.75 1846.68 N 5518.13E 6015900.86 N 562772.85 E 0.788 5818.41 8219.17 66.760 92.850 4386.93 4450.67 1842.98 N 5604.34 E 6015897.82 N 562859.09 E 0.781 5899.40 8313.29 65.950 91.770 4424.68 4488.42 1839.50 N 5690.49 E 6015895.00 N 562945.26 E 1.358 5980.39 8392.71 65.560 92.020 4457.30 4521.04 1837.10 N 5762.86 E 6015893.16 N 563017.65 E 0.569 6048.59 ...-.. 8455.00 65.560 92.510 4483.07 4546.81 1834.86 N 5819.52 E 6015891.36 N 563074.33 E 0.716 6101.88 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 72.260° (True). 29 November, 2004 - 15:44 Page 4 of 5 DrillQuest 3.03.06.006 Halliburton Sperry-Sun Survey Report for MPG-19 MWD Your Ref: API 500292322800 Job No. AKMW3361723, Surveyed: 8 November, 2004 BPXA Milne Point Unit Based upon Minimum Curvature type calculations, at a Measured Depth of 8455.00ft., The Bottom Hole Displacement is 61 01.93ft., in the Direction of 72.500° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 8455.00 4546.81 1834.86 N 5819.52 E Projected Survey Survey tool proQram for MPG-19 MWD From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 442.00 0.00 441.96 442.00 8455.00 441.96 BP High Accuracy Gyro - GYD-CT -DMS 4546.81 MWD Magnetic 29 November, 2004 - 15:44 Page 5 of 5 DrillQuest 3.03.06.006 '-" 05-Dec-04 AOGCC Robin Deason 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well MPG-19 Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 8,455.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date-2J Ik.~~ ~ Signed ~J ûiLJ Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) .~ 05-Dec-04 AOGCC Robin Deason 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPG-19 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Su rvey: 0.00' MD 0.00' MD 8,455.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services AUn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date~ (U~Lf 1k f¡ rllj Signed ' f\f1Vve.'J..) kL ' I Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ß.t::. IVlrv-V.JJ-\., IVlrV-l7 UVllU lVb;) ~ '"-,, Subject: Re: MPG-03A, MPG-19 Bond logs From: Thomas Maunder <tom _ maunder@admin.state.ak.us> Date: Mon, 06 Dec 2004 09:30:03 -0900 To: "Green, Matt D" <GreenMD@BP .com> CC: Dave Reem <reemdc@bp.com>, John Cubbon <CubbonJR@BP.com> Matt, You did send me the correct diagrams, what I was referring to were the drawings the Schlumberger included in their SCMT presentations. I understand that the correct drawings are the proposed completions and there will be some minor differences in final depths. I have completed my review of the bond logs you sent over. I conclude that the isolation in each well is acceptable and you may proceed to complete the wells as planned. Please be sure that the inner annulus pressure test is held for 30 minutes when 4ES completes the wells. This test should also be documented using the AOGCC MIT test reporting form. Please contact John Cubbon at Milne for an e-copy. John, after the wells have been placed in service and are thermally stable please make arrangements for an Inspector to witness a MIT. Please call or message with any questions. Tom Maunder, PE AOGCC Green, Matt D wrote: Hi Tom, I must have sent you the wrong completion diagrams! Those were the status that Doyon 14 left the wells with a kill string. Nabors 4ES will do the final completion. Those diagrams are also not the official final diagrams, so please excuse the inaccuracies - some data would still be planned data I would think. Here are the planned completion diagrams again. My apologies for the confusion. Cheers, Matt. From: Thomas Maunder [mailto:tom maunder@admin.state.ak.us] Sent: Monday, December 06, 20048:11 AM To: Green, Matt D Subject: Re: MPG-03A, MPG-19 Bond logs Matt, 10f2 12/6/2004 9:30 AM Ke: lVU'U--UJ1\, lVU'\"'}-l ':J tlOna lOgS '''-'". \~ I just had a look at the bond logs and they look pretty good. I am curious regarding the completion drawings. It appears that there is just a tubing string hung in the wells. Will 4 ES be doing the final completions?? Also, on the drawing in MPG-03, the correct name should be MPG-03A (the log header is correct) and the 7" casing setting depth noted on the front is actually the float collar depth. Similar information on MPG-19 is correct listing the shoe depth. Thanks, Tom Green, Matt D wrote: Hi Tom, One of those was a 2.4Mb zipped file! However, I just had copies of the logs delivered to my desk from another source and they are now in the mail and you should get them tomorrow anyway. Cheers, Matt. From: Thomas Maunder [mailto:tom maunder@admin.state.ak.us] Sent: Thursday, December 02, 2004 3: 15 PM To: Green, Matt D Subject: Re: MPG-03A, MPG-19 Bond logs Hi Matt, They won't even come zipped?? I just checked I have some 800 k compressed files from CP AI that are 4.2 m uncompressed. But, if they won't go they won't go. Tom Green, Matt D wrote: Tom. Those files are too big to send for us, so I'll have to get some more prints and mail them to you. It will probably be next week if that is OK. Cheers, Matt. 20f2 12/6/20049:30 AM c...o~ \tt-\\-o-. ~~ V\.C> \- Ç-, \~'G..~ o~";)-I ~ '~ ~ ·dOL\-\~~. . . MECHANICAL INTEGRITY REPORT' '.. :. I G R E L E;. S::: = OPER & FIELD ß \> N\.~\6\ ~ k~LL NUMBER M\7G-\S =?UD DA!~: ~~1,:LL DATA TD : .liD.. Ca.sing:~ Shoe: Sj'-\,"\:;). HD :':':1er: N:>~ ~"'t>~~:'t4.+ !ill :ubi!:"!g: Packer HD TVD; ?BTD: <i(3S~ MJ? TVD TVD¡ DV: ~~. MD ~~'T\lD TVD¡ ""'''''T''! .:..lJ..t' : HD -:VD TVD¡ See ët (>~~cs.C2.à ,\" '-\ \"~~'«> to . <6\1->- anå ~~ Perfs ::ole Size ~ ~~5C-~t)-\ '3 ~C?'..ANIC;'~ INTEGRITY - PART 11 Annulus Press Test: iP ; 15 min 30 min CO[lj!¡lents: ,..- ~CR.þ...NICÞ.~ I:NTEGRITY - PART i 2 Csg DV Cement Volumes:' .Amt. Line.r C~t ~ol to cover perfs The.oretical Toe ~ ~c.. \-.{, Cement Bond Logf~or No) ; In AOGCC File \\/~S-O~ CBL Evaluation, =one above perfs ~-.LS-«\.~.s.-\ot>~~ ~~~~ 4;~Q ~~~'-,"d'\..~~\s ¥\O<"'o,"\ \o~ ~ "-\<;.00' P roàuc..tion La g : Typ e ¡Evaluation CONCLUSIONS: ? art : 1 : ?ar-:: :Z: ~~ \":> ,~~~ 1J2.~ , . \ \"'"'1 .. . çr- G:. ,..,.Ò~ lVlt..U-V-.f\. anu IVlrU-l ':I rta lU1 dl1Ull~ dllU r d\,,1\.Ca .ul;;pUl~ "-"' Subject: MPG-03A and MPG-19 Perforations and Packer Depths From: "Green, Matt D" <GreenMD@BP.com> Date: Thu, 02 Dec 2004 14:40:44 -0900 To: tom _ maunder@admin.state.ak.us CC: "David Reem (Reem, David C)" <ReemDC@BP.com> Tom and Dave, Here are the planned perforations and packer depths for MPG-03A and MPG-19. All depths are referenced to pertinent bond logs. Attached are the planned completion diagrams. Also attached are the bond logs for your perusal. Cement is good on both wells. We plan complete the wells in the next week or so. MPG-03A Packer NB Perfs NC Perfs Packer NE Perfs Packer OA Perfs OA Perfs Packer OB Perfs GR Marker Short Joint MPG-19 Packer N B Perfs Packer N E Perfs Packer OA Perfs OA Perfs Packer OB Perfs GR Marker GR Marker Cheers, 10f2 5890- ft 5942 to 5952-ft (10-ft) 5962 to 5977-ft (15-ft) 5992-ft 6010 to 6050-ft (40-ft) 6100-ft 6157 to 6172-ft (15-ft) 6187 to 6217-ft (30-ft) 6244- ft 6277 to 6317-ft (40-ft) 5860-ft 5860 to 5880-ft 7570-ft 7650 to 7680-ft (30-ft) 7740-ft 7783 to 7823-ft (40-ft) 7946-ft 8004 to 8024-ft (20-ft) 8040 to 8D80-ft (40-ft) 8130-ft 8183 to 8213-ft (3D-ft) 7502-ft 7855-ft 12/2/2004 3: 11 PM lVU'\...}-U..)f\ ana !YlrU-! '1 r~nUn:lllUWS eUlU n:ll;K~l Ut:pLWS "'-" Matt. «MPG-03A Proposed v2.0.Zrp» «MPG-19i Proposed v2.0.ZIP» Bond logs to follow (too big!) Content-Description: MPG-03A Proposed v2.0.ZIP Content-Type: application/x-zip-compressed Content-Encoding: base64 MPG-19i Proposed Content-Description: MPG-19i Proposed v2.0.ZIP Content-Type: application/x -zip-compressed Content-Encoding: base64 20f2 12/2/20043:11 PM Tree: 3-1/8" - 5M ,MPG-19i Proposed Wellhead: 11" 5M FMC Gen \s-j 20" 91.1 ppf, H-40 DJ:Ð KOP = 275 ft Max. hole angle = 70 deg @ 6016' MO Max dog leg = 7.8 deg/100-ft @ 2764' MO 3-1/2" 9.2 ppf L-80 TCII Tubing (Orift 10 = 2.867, Cap. = 0.0087 bpf) NB Perforations: (MWD log only) 6 spf 7635-7665' MD NE Perforations: (MWD log only) 6 spf 7770-7810' MD OA Perforations: (MWD log only) 6 spf 7990-8010' MD 8025-8065' MD OB Perforations: (MWD log only) 6 spf 8170-8200' MD 7" 26 ppf, L~80, BTC-MOO Casing (drift 10 = 6.151", cap. = 0.0383 bpf: DATE REV. BY 09/22/04 S Coyner 17Nov04 M Green Orig. OF Elev. = 59.3' "-'" Orig. GL Elev. = 29.2' HES X-Nipple (2.813") I 500' MOl 31/2' X 1 1/2" MMG GLM 12100' Mol 9-5/8"40#/ft L-80 BTC-M 13978' Mol Planned Top of Cement 15649' Mol HES X-Nipple (2.813") 17470' Mol 7" X 3 1/2" Baker Premier PKR 17550' Mol 3 1/2' X 1 1/2" MMGW GLM 3 1/2' X 1 1/2" MMG GLM 7" X 3 1/2" Baker Premier PKR 17725' MDI 3 1/2' X 1 1/2" MMGW GLM 3 1/2' X 1 1/2" MMG GLM 7" X 3 1/2" Baker Premier PKR 17930' MD 3 1/2' X 1 1/2" MMGW GLM 3 1/2' X 1 1/2" MMG GLM 7" X 3 1/2" Baker S-3 Packer 18120' Mol 31/2' X 1 1/2" MMGW GLM 3 1/2' X 1 1/2" MMG GLM HES XN-Nipple 2.75" Min. 10 3 1/2" WLEG 18285' Mol 7" float shoe 18442' MOl COMMENTS Proposed Selective Injector Added 4th packer and mandrels MILNE POINT UNIT WELL MPG-19i BP EXPLORATION (AK) ""-/ STATE OF ALASKA .~' 1/28/04 OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Submit to: ¡¡m rem:¡@admín.state.ak.HS aOQCG prudhoe bav@adm¡n.state.ak.us bob f;eckenste¡n@admín.state.ak.us Contractor: Doyon Rig No.: 14 DATE: 11/5/2004 Rig Rep.: Eghlom/Marmon Rig Phone: 670-3270 Rig Fax: 670-3269 Operator: BP Op. Phone: 670-3268 Op. Fax: 670-3269 Rep.: Vaughn / Brown Field/Unit & Well No.: MP G-19i PTD # 204-192 Meridian: UM Location: Section: 27 Township: 13N Range: 10E Operation: Drlg: Workover: Explor. : Test: Initial: XXXXX Weekly: Other: Test Pressure: Rams: 250/3000 Annular: 250/2500 Valves: 250/3000 TEST DATA MISC. INSPECTIONS: FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.: P Well Sign P Upper Kelly 1 P Housekeeping: P Drl. Rig p Lower Kelly 1 P PTD On Location P Hazard Sec. p Ball Type 1 P Standing Order Posted P Inside BOP 1 P BOP STACK: Quantity Size Test Result CHOKE MANIFOLD: Annular Preventer 1 13 5/8 P Quantity Test Result Pipe Rams 1 2 7/8 x 5 P No. Valves 14 P Lower Pipe Rams 1 3 1/2 x 6 P Manual Chokes 1 P Blind Rams 1 Blind P Hydraulic Chokes 1 P Choke Ln. Valves 1 3 1/8 P HCR Valves 2 31/8 p ACCUMULATOR SYSTEM: Kill Line Valves 1 3 1/8 p Time/Pressure Test Result Check Valve 0 NA System Pressure 3100 P Pressure After Closure 1900 P MUD SYSTEM: Visual Test Alarm Test 200 psi Attained 36 sec P Trip Tank P P Full Pressure Attained 3 min 15 sec P Pit Level Indicators P P Blind Switch Covers: All stations P Flow Indicator P P Nitgn. Bottles (avg): 4 @ 2300 Meth Gas Detector P P H2S Gas Detector P P Test Results Number of Failures: º Test Time: 4.5 Hours Components tested Repair or replacement of equipment will be made within the same days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Superviser at: Bm reQQ@admín.state.ak.us Remarks: 24 HOUR NOTICE GIVEN YES X NO Waived By John Spaulding Date 11/04/04 Time 6:00 AM Witness Nick Marmon Test start 21:00 Finish 1:30 BOP Test (for rigs) BFL 1/28/04 BOP Doyon 14 11-05-04.xls :~ ~1ffA\lTŒ mìr~ -..-1 J rT\\ \ I UlJ FRANK H. MURKOWSK/, GOVERNOR AT¡ASIiA. ORAND GAS CONSERVATION COMMISSION 333 W. PH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Milne Point MPG-19i BP Exploration (Alaska) Inc. Permit No: 204-192 Surface Location: 1576' NSL, 3338' WEL, SEC. 27, TI3N, RI0E, UM Bottomhole Location: 3441' NSL, 2779' WEL, SEC. 26, TI3N, RI0E, UM Dear Mr. Archey: Enclosed is the approved application for permit to drill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25, of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659- (pager). BY ORDER OJ THE COMMISSION DATED this1 day of October, 2004 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. A 1....11... n¡\~; ~jJ,¡~ Guns. om " 1a. Type of work II Drill o Redrill rb. Current Well Class o Exploratory g Deveropmen~filltiPle Zone ORe-Entry o Stratigraphic Test II Service 0 Developmen gle Zone 2. Operator Name: 5. Bond: a Blanket o Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 2S 100302630-277 MPG·19i 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519-6612 MD 8449' ,/ TVD 4532' , Milne Point Unit / Schrader Bluff 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: ADL 025518 ,/ 1576' NSL, 3338' WEL, SEC. 27, T13N, R10E, UM -" Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 3466' NSL, 3565' WEL, SEC. 26, T13N, R10E, UM (NB) , 1 0/30/04 Total Depth: ~ 9. Acres in Property: 14. Distance to Nearest Property: 3441' NSL, 2779' WEL, SEC. 26, T13N, R10E, UM 2560 11100' 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation KBE= 15. Distance to Nearest Well Within Pool Surface: x- 557269 .~ y- 6014012 , Zone- ASP4 (Height above GL): 59.3' feet 352' away from MPG-11 16. Deviated Wells: Kickoff Depth:J...~¡ .fJ fee!1~./)~ 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 68.84 _ Downhole: 21 00 ~ Surface: 1657' I~< -'--;:"~;i;;;7'f"' .. -. - .. A>k¡-~;¿ · C .,,';_ ..... / .> " ...'.'.".....: '~,·Ui"""<,··,·'./,·/.."··t Hole Casina Weiaht Grade Coupling Length MD TVD MD TVD (includina staae data 42" 20" 92# H-40 Welded 80' 34' 114' 34' 114' 1260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC-M 4024' 30' 4054' 30' 2029' 383 sx AS Lite, 408 sx Class 'G' 8-3/4" 7" 26# L-80 BTC-M 8419' 30' 8449' 30' 4532' 525 sx Class 'G' 19.',. PReSEN"fWEL..L.ë<i>N(¡)I"[IQI\IL~M. - Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): Qa$ing . ......., ',... I...engtþ.·,...., "i 'ii.)... .., --- , ~trLJr.tlJral Conductor ~lIrf;:¡r.P. I . . .. Production Liner Perforation Depth MD (ft): rerforation Depth TVD (ft): 20. Attachments a Filing Fee, $100 o BOP Sketch a Drilling Program o Time vs Depth Plot o Shallow Hazard Analysis o Property Plat o Diverter Sketch o Seabed Report a Drilling Fluid Program a 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: " Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Skip Coyner, 564-4395 Printed Name Pat Archey Title Senior Drilling Engineer p ç J/\fJ Prepared By Name/Number: ~- ~~ ,...., ,'~ "'>/'(.,:."',' . ,", ' . .'.... '.. " ' ,.. Permit To Drill." t.( -" . 9~ API Number: q~3~~" Permit Approval /t. See cover letter for Number: 2CJ I 50- 6~ "'"'"CO Date: / vi/¿? t:' Lf otherrequirements Conditions of Approval: Samples Required 0 Yes ~)l0 Mud Log Required 0 Yes ~ No Hydrogen Sulfide Measures 0 Yes .1521 No Directional Survey Required J& Yes 0 No Other: ~\\* UL~ ~\,~\ty;:::)" 3>0(j)~c:;\\3C)~\cL~~; t3()\>~~\-\~~(t~ \ ~ \ L-\. fu't~. o~' I '" c..o......~ Ü<:3-"'Ck v.J l A. \. 0 '0 ß" AODroved Bv: ~ ~ OR I GINA L APPROVED BY /tJ# (of' - i THE COMMISSION Date Form 10-401 Re~d 06/2 ~ SLbrmt In E5uplicate STATE OF ALASKA '.",- DECEIVED ALASKA õrt AND GAS CONSERVATION COMMI1SSIOI'J' ,,' .,.,,- , . PERMIT TO DRILL SEP 2 4 2.004 20 MC 25 005 emission ',-" bp IWell Name: I MPG-19i Schrader Bluff: NB, OA, OB Selective Injector Drill and Complete Plan Summary I Type of Well: I Schrader Bluff: Selective Injector Surface Location: 1576IFSL,3704'FNL,3338IFEL,1942'FVVL .,. (As Staked) Section 27, T13N, R10E UM E = 557,269' N = 6,014,012' Top NB Sand at 7603' MD 34661 FSL, 1814' FNL,35651 FEL, 1715'FVVL Section 26, T13N, R10E UM E = 562,303' N = 6,015,942' Z = 4222' TVD Top OA Sand at 7971' MD 34551 FSL, 1825'FNL,3222IFEL,2058'FVVL Section 26, T13N, R10E UM E = 562,646' N = 6,015,934' Z = 4357' TVD Top OB Sand at 8176' MD 34491 FSL, 1831'FNL,3033IFEL,2247'FVVL Section 26, T13N, R10E UM E = 562,836' N = 6,015,930' Z = 4432' TVD BHL at 8449' MD 34411 FSL, 1839'FNL,2779IFEL,2501'FVVL /'" Section 26, T13N, R10E UM E = 563,090' N = 6,015,924' Z = 4532' TVD Distance to Property line 11 , 1 00' Distance to nearest well 352' from MPG-11 AFE Number: Estimated Start Date: 30 Oct 04 Ri Ri 10 1 "",-,. ."'-" LSND 10 - 11 9.0 - 9.5 < 6 8-3/4" Intermediate Hole 4054 - 8449' : Densi 9.4-9.6 Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 05-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R. Recommended Bit Program: BHA HoleSize 1 12.25 in 2 8.75 in Surf - 4,054' 4,054' - 8,449' MXC1 1-1-7 450 - 600 400 - 550 3,940' 4,395' .75 - .90 .50 - .75 Casingrrubing Program Hole Size 42-in 12.25 in 9.625-in 8.75 in 7-in 92# 40# 26# H-40 Welded L-80 BTC-M L-80 BTC-M 80' 4,024' 8,419' 114' /114' 4,054' / 2,029' 8,449' / 4,532' 34' 30' 30' Cement Program: 9-5/8", 40#, L-80, BTC Surface Casing at 4054' MD Excess from B/Permafrost to Suñace = 1000/0 over gauge hole. Use 400/0 excess below the B/Permafrost. Tail cement = 1000' MD. Wash 10 bbl water 25 bbl CW 100 Spacer 75 bbl of MudPush Lead 303 bbl, 383 sx of Arctic Set Lite: 10.7 ppg and 4.44 ft\j/sx Tail 85 bbl, 408 sx "G" mixed at 15.8 Ib/gal & 1.17 ft"/sx Temp Casing Point BHST 450 F (estimated by Dowell) i'. .". ·'.i >j>i\i 7",26#, L-80, BTC-M Intermediate Casing at 8449' MD Top of cement to be 500' MD above Ugnu sands: 400/0 excess. Shoe Joint = 85 ft, TOC = 5649' MD Total Cement 5-bbl water Volume: 108.5 bbl Wash 25 bbl CW 100 Spacer 40 bbl of MudPush Tail 108.5 bbl, 525 sx "G" mixed at 15.8 Ib/gal & 1.16 ft"/sx Temp BHST =80°F from SOR Casing Size Basis Total Cement Volume: 388 bbl Casing Size Basis 2 ~/ Evaluation Program: '~~ 12-1/4" Section Open Hole: MWD/GR IFRlCASANDRA Sperry InSite " ."., ..:>:/<. .. .'./ 8-3/4" Section Open Hole: MWD/GRlRES IFRlCASANDRA Sperry InSite Cased Hole: GR I USIT I CCL Formation Markers: Formation Tops MD TVD (ft) Pore Pressure EMW (ft) (psi) (Ib/gal)* BPRF 1,926 1,859 782 8.35 TUZC 6,149 3,665 1566 8.35 Ugnu-MA 6,853 3,927 1680 8.35 Ugnu-MB1 6,894 3,945 1687 8.35 Ugnu-MB2 7,016 3,993 1708 8.35 Ugnu-MC 7,402 4,144 1774 8.35 SBF2-NA 7,517 4,187 1984 9.12 SBF1-NB 7,603 4,222 1999 9.12 SBE4-NC 7,676 4,249 2012 9.12 SBE2-NE 7,744 4,274 2024 9.12 SBE1-NF 7,878 4,323 2048 9.12 TSBD-Top OA 7,971 4,357 2064 9.12 TSBC-Base OA 8,070 4,393 2081 9.12 TSBB-Top OB 8,176 4,432 2100 9.12 SBAS-Base OB 8,253 4,460 2114 9.12 NB owe 4,163 OA owe 4,189 OB owe 4,167 ..... Well Control: Intermediate/Production hole: · Maximum anticipated BHP: 2,100 psi at 4,432' TVD (Top of the OB sand) - · Maximum surface pr.essurê:·l~65'ipšr~~.laased on a full column of gas at 0.1 psi/ft) ./ · Planned BOP test Press.ure:.-3-,eoo,wpsr · Integrity tests: FIT to 11.3 Ib/gaI20' below the 9-5/8" shoe. Kick tolerance: 26.5-bbl with 9.6Ib/gal mud at below the 9-5/8" shoe. · Planned completion fluid: MOBM in Laterals with 9.6 ppg Brine and Diesel above. Drilling Hazards & Contingencies: · Hydrates have not been reported on G-Pad however G-8 reporter gas-cut mud at 2020' TVD. · Tight hole and packing off due to clays and poor hole cleaning has occurred on G Pad wells. · The Schrader Bluff sands underlying G Pad are expected to be slightly over-pressured from to offset injection wells. 3 Lost Circulation · We do not expect losses while drilling this well if there is good hole cleaning. · Offset wells have reported losses while running and cementing surface casing. If seepage and/or losses occur, follow the LOST CIRCULATION DECISION MATRIX in the well plan. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Condition the mud before POOH to run casing and watch surge pressures. ......~' '-"" Expected Pressures · The Schrader Bluff sands are slightly elevated (9.2 ppg) due to offset injectors (MPG-03i). .~ Pad Data Sheet · Please Read the G-Pad Data Sheet thoroughly. Breathing Hazards · Not expected or predicted. Hydrocarbons · Hydrocarbons will be encountered in the Ugnu through the Schrader Bluff. Faults · One (1) fault is mapped in the surface hole section. This fault will be cut at ± 3211' MD. The surface casing will be set below this fault to ensure wellbore integrity to TD. Hydrogen Sulfide · MPG Pad is not designated as an H2S Pad. There are no Kuparuk wells on MPG Pad. ,... Anti-collision Issues · MPG-19i passes the Major Risk Criteria in the Mother Bore and all laterals. Gyro surveys will be required for close approach issues and magnetic interference down to ± 1400 ft MD. Distance to Nearest Property · MPG-19i is 11,100 ft from the nearest Milne Point property line. Distance to Nearest Well Within Pool · MPG-19i is 352 ft from the nearest Schrader Bluff sand penetration in MPG-11 4 DRILL & COMPLETION PROCEDURE ~ Pre-Ria ODerations 1. The 20" conductor will be installed pre-rig. Drillina 1. MIRT and NU Diverter. 2. Function T~ªt[)iYe~r, PU 4" DP and BHA. 3. Drill 12.25" surface hole. 4. Run and cement 9.625" surface casing. 5. ND diverter, install wellhead and NUfTest BOP. ('" 6. Drill 8.75" intermediate hole. 7. Run and cement 7" production casing. 8. Make a bit and scraper run. 9. Displace the well with completion fluid. 1 O. Run a GR I USIT I eel (or scmt). 11. Perforate the NB, OA and OB. ./ 12. Run the selective injection completion (see diagram). 13. ND BOP/NU Tree. 14. Freeze Protect. 15. RDMO Doyon 14. 5 a. u... () o I- w ?-v .'<1- ~n,§~ ~vg -~- I 20 L___________________________________...., N2800 ~ 1 ~ j G-18 . G-8 . G-15. G-7 . G-14 . G-16 . A G-6 (Abandoned) G-13. G-5 . G-17. G-4 . G-12. G-3 . G-11 . G-2 . G-10. G-1 . G-9 . .. G-19 LEGEND VICINITY MAP N.T.S. . EXISTING CONDUCTOR .. PROPOSED CONDUCTOR A ABANDONED CONDUCTOR I I I I I I I I I I I ~ W ¡ a. \ I \ J: ,--__________________ ____________ o} 2000 ~ í g ¡ - It) ex¡ MPU G-PAD NOTES 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, ALASKA, NAD 27. 2. PAD SCALE FACTOR IS 0.999903725. 3. HORIZONTAL AND VERTICAL CONTROL IS BASED ON MPU G-PAD MONUMENTS G-1 AND G-2. 4. ELEVATIONS ARE BPX MILNE POINT DATUM M.S.L. 5. GEODETIC COORDINATES ARE NAD 27. LOCA TED WITHIN PROTRACTED SEC. 27, T. 13 N., R. 10 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC PAD SECTION NO. COORDINA TES COORDINATES POSITION(DMS) POSITION(D.DD) ELEVATION OFFSETS MPG-19 y= 6,014,011.91 N 2,140.00 70'26'56.097" 70.4489158" N/A 1,576' FSL ,/ X= 557,268.97 E 1,185.00 149'31'58.052" 149.5327922" 3,338' FEL /' o 8 25 04 ISSUE FOR INFORMAllON NO. DA'IE REVISION F. Robert DRAWN: ObP JACOBS ~ CHECKED: ALLISON DATE: 8/25/04 DRAWING: SHEET: FRB04 MPG 02-00 MILNE POINT UNIT G-PAD ¡ fÐ~~ŒJœD JOB NO: SCALE: PROPOSED CONDUCTOR 1 OF 1 JJ RFA ENGINEERS AND LAND SUR\£YORS WELL MPG-19 aot WEST fJREVIEED LJ.NE '"==200' BY CHK ANCHORAGE. AlASKA n503 BP EXPLORATION (AK) MILNE POINT UNIT WELL MPG-19i 18449' MO I 7" float shoe 18285' MOl 3 1/2" WLEG 3 1/2' X 1 1/2" MMG GLM 18140' Mol 31/2' X 1 1/2" MMG GLM 18200' MOl HES XN-Nipple 2.75" Min. 10 18240' Mol 7" X 31/2" Baker S-3 Packer 18095' Mol 18025' MOl 3 1/2' X 1 1/2" MMG GLM 3 1/2' X 1 1/2" MMG GLM /7965' Mol 7" X 31/2" Baker Premier PKR 17695' Mol 17620' Mol 3 1/2' X 1 1/2" MMG GLM 31/2' X 1 1/2" MMG GLM 17565' Mol HES X-Nipple (2.813") 17470' MOl 7" X 31/2" Baker Premier PKR 7510'Mol Planned Top of Cement 15649' MOl 9-5/8"40#/ft L-80 BTC-M 14054' Mol 12100' Mo 3 1/2' X 1 1/2" MMG GLM I 500' Mol HES X-Nipple (2.813") COMMENTS Proposed Selective Injector DATE REV. BY 09/22/04 S Coyner 7" 26 ppf, L-80, BTC-MOD Casing ( drift ID = 6.151 ", cap. = 0.0383 bpf ) 08 Perforations: to be determined 6 spf between 8180' & 8250' MD OA Perforations: to be determined 6 spf between 7975' & 8065' MD NB Perforations: to be determined 6 spf between 7604' & 7674' MD 3-1/2" 9.2 ppf L-80 TCII Tubing (Drift 10 = 2.867, Cap. = 0.0087 bpf) KOP = 275 ft Max. hole angle = 68.53 deg. Max Dog Leg = 4 deg /100 ft 20" 91.1 ppf, H-40 ~ \,-,'! Orig. OF Elev. = 59.3' Orig. GL Elev. = 29.2' Tr'ee: 3-1/8" - 5M \,-" MPG-19i Proposed Wellhead-=- 11" 5M FMC Gen 6 "-"'. ~ bp September 22, 2004 Tom Maunder Alaska Oil & Gas Conservation Commission 333 W. 7th Avenue, Suite 100 Anchorage, AK 99501 Re: Request for a maximum 14-day BOPE test frequency for Doyon 14 MPG-19i Mr. Maunder: BP Exploration (Alaska) Inc. ("BP") hereby to requests an exception to 20 AAC 25.035(e)(10)(A) per 20 AAC 25.035(h)(1) for a maximum14-day BOPE test frequency for the Doyon 14 drilling rig. The requested exception pertains to the drilling of MPG-19i, a build-and-hold injection well in the OB, OA & NB sands. In the first 6 months 2004, Doyon 14 performed 21 successful BOPE tests. In these tests, auxiliary equipment failed on three occasions as previously documented. During the 3rd quarter of 2004, the BOPE has been tested four (5) more times with only one notable failure: that being the HCR valve which was changed out and re-tested. If you have any questions or require any additional information, please contact the undersigned at 564-4395. Sincerely, ~n~ Drilling Engineer BP Exploration (Alaska) Inc. ,",-,c ~ bp I Well Name: MPG-19i Schrader Bluff: NB, OA, DB Injector AOR Scan Data Sperry-Sun has performed an anti-collision scan for MPG-19i at all depths. The radius of the AOR scan was 1320 ft. In the AOR radius at Schrader Bluff depth is only one well: MPG-11. Anticollision Report MPG-19 Wp11 Date Composed: Version: Tied-to: 8/19/2004 53 From Well Ref. Point Yes Summary M Pt C Pad M PC-41 MPC-41L1 V16 Out of range M Pt G Pad MPG-01 MPG-01 V1 398.73 400.00 59.65 9.30 50.35 Pass: Major Risk M Pt G Pad MPG-02 MPG-02 V1 1417.09 1425.00 50.00 40.94 9.07 Pass: Major Risk M Pt G Pad MPG-03 MPG-03 V1 323.39 325.00 180.80 7.41 173.39 Pass: Major Risk M Pt G Pad MPG-03 Plan MPG-03A VO Plan: 323.39 325.00 180.80 7.41 173.39 Pass: Major Risk M Pt G Pad MPG-04 MPG-04 V1 394.83 400.00 241.89 11.21 230.68 Pass: Major Risk M Pt G Pad MPG-04 Plan MPG-04A VO Plan: 394.83 400.00 241.89 11.16 230.73 Pass: Major Risk M Pt G Pad MPG-05 MPG-05 V1 414.23 425.00 363.98 10.77 353.20 Pass: Major Risk M Pt G Pad MPG-06 MPG-06 V1 3119.50 3050.00 134.30 84.83 49.47 Pass: Major Risk M Pt G Pad MPG-09 MPG-09 V2 845.67 850.00 38.66 14.80 23.85 Pass: Major Risk M Pt G Pad MPG-10 MPG-10 V4 299.60 300.00 90.58 6.11 84.48 Pass: Major Risk M Pt G Pad MPG-11 MPG-11 V2 6640.02 6525.00 352.56 312.81 39.76 Pass: Major Risk M Pt G Pad MPG-12 MPG-12 V5 347.24 350.00 210.51 6.50 204.01 Pass: Major Risk M Pt G Pad MPG-16 MPG-16 V6 2055.10 2075.00 273.49 37.43 236.06 Pass: Major Risk M Pt G Pad MPG-16 MPG-16L1 V4 2055.10 2075.00 273.49 37.30 236.19 Pass: Major Risk M Pt G Pad MPG-16 MPG-16PB1 V9 2055.10 2075.00 273.49 37.27 236.22 Pass: Major Risk M Pt G Pad MPG-16 MPG-16PB2 V2 2055.10 2075.00 273.49 37.27 236.22 Pass: Major Risk M Pt G Pad MPG-18 MPG-18 V6 3731.23 3675.00 262.47 1 00.41 162.05 Pass: Major Risk M Pt G Pad MPG-18 MPG-18L 1 V3 3731.23 3675.00 ; 262.47 100.28 162.18 Pass: Major Risk M Pt G Pad MPG-18 MPG-18PB1 V2 3731.23 3675.00 262.47 100.40 162.07 Pass: Major Risk M Pt G Pad MPG-B MPG-B VO 38.83 29.77 149.79 No Offset Stations 5927 SURVEY PROGRAM DepthFm Depth To SwveyiPlan 3430 1500.00 1500.00 8449.14 Plan:MPG~19 Wpl J (Plan MPG~J9iMPG-19) COMPANY DETAILS BP Amooo REFERENCE lNFORM..A.TION Too¡ CB-GYRO..sS MWD+IFR+MS Created By: Troy Jakabosky Che<:ked: Date: 91212004- Date Reviewed: Date w 32 CASING DETAILS No. TVD MD Name Size 2909.27 4054.36 9,625 4532.15 8449.00 7.000 WELL DETAIL"; Nmre +NI·g +El-W Northing Easúng utitude Lougitude Slot Plan MPG~19 2273.89 &89.i3 6014ülL9J 55726K97 10"26'56.091N 149"31'58.052W NlA TARGET DETAILS Nmre TVD +Nl-S +EJ~W -"" EaW:ug Shape Start Dír 2.51/100' ; 1092.79' MD. lillI4.36'fVD ISO) 150) Start Dir L77/IOO' ; 275.03' MD. 275.03'TVD " ~ is ::s t o ~ 24 " > 2 ,... ; 2864.35' MD, 241024' TVD Start Dir 41/100' ; 3164,35' MD, 2586.32'TVD End Di, ; 3294.35' MD. 2634.97' TVD SECTION DETAILS Sec MD Ine Azi TVD +NI-S +EI-W DLeg TFaee VSec Target I 34.30 0.00 0.00 34.30 0.00 0.00 0.00 0.00 0.00 2 275,03 0.00 0,00 275.03 0.00 0,00 0.00 0.00 0,00 3 569.15 5.00 120.00 568.77 -6.41 11.11 1.70 120.00 8.62 4 992.79 13.00 100.00 986,95 ,23.95 74.14 2.00 328.52 63,31 5 1092,79 13,15 91.18 1084.36 -26,14 96.59 2,00 -90,00 84.03 6 1312,79 14,24 68.24 1298.27 -16.61 146,77 2.50 -90.00 134.72 7 1852.79 30.44 68.24 1796.09 59.22 336.72 3.00 0.00 338.75 8 1944.35 30.44 68,24 1875.03 76.42 379,80 0.00 0.00 385,02 9 2864.35 67.24 68.24 2470.24 328.83 1012.02 4.00 0.00 1064,10 10 3164,35 67.24 68.24 2586.32 431.40 1268.94 0.00 0,00 1340,05 II 3294.35 68.84 62.90 2634.97 481.27 1378.64 4.00 -73.00 1459,73 12 6344.35 68.84 62,90 3735.77 1776,87 3910.86 0.00 0.00 4266.35 13 7024.50 66,97 92.24 3996.46 1911.62 4517.38 4.00 99.48 4885.07 14 7564.03 66.97 92.24 4207.51 1892,18 5013.54 0.00 0.00 5351.70 15 7602.58 68.00 91.00 4222.27 189!.!7 5049.13 4.00 -48.43 5385.30 MPG-19TU 16 7623.90 68.53 91.72 4230.1 7 1890.70 5068.93 4,00 51.62 5404,0] 17 8176,10 68.53 91.72 4432.27 1875.29 5582.59 0.00 0.00 5888.54 MPG-19 T2.2 18 8249.14 68.53 91.72 4459,00 1873.25 5650.53 0.00 0.00 5952.62 19 8449,14 68,53 91.72 4532.20 1867.67 5836.57 0.00 0.00 6128.II FORMATION TOP DETAILS No. TVDPatb MDPatb Formation 1 1926.07 2 6149.01 3 6853.08 4 6893,90 5 7016.35 6 7402.36 7 7517.40 8 7602.58 9 7676.10 10 7744.40 II 7878.28 12 7971.18 13 8069.54 14 8176,10 15 8252.61 ; 7024.5' MD, 39%.46' TVD Start Dír 311100'; 1312.79' MD. 1298,27'TVD o 800 1600 2400 3200 4000 [8ooMrt] 4800 5600 7200 SURVEY PROOR..>\M Plan: MPG· 9Wpll (PJanMPG·19IM:PG.!9 Depth Fro Depth To SurveylPhm Tool Created By: Troy Jakabosky Date: 9/2/2004 3430 1500,00 VS3 CB.o):'Ro.ss Checked: Date:_ [500.00 &449.14 V53 MWD+1FR+MS R¢viewed: Date:_ Approved: Date:_ - - WELL DETAILS """" i"N!-8 rE/¥W - -"" Latitude Longitude Slot Plan MPG-I<) 227K89- ,,,,. 70"26'56,097N !49"3!'5K052W NlA JS: 150) TVD +Ni-S +Ei-W DLeg TFace VSec Target MPG-19 n.1 MPG,I9 T2.2 Azi Ine MD See 1 2 3 4 5 6 7 8 9 !{) ¡¡ 12 13 14 15 16 17 18 19 7538 4 FORMA nON TOP DETAILS No. TVDPath 1 2 3 4 5 6 7 8 9 !{) 11 12 13 14 15 West' 2827 Size No. TVD MD Name g +' J5 t: " ~. ~. " 00 Company: BP Amoco Field: Milne Point Site: MPtGPad Well: Plan MPG-19 Wellpath: MPG-19 Plan: MPG-19 Wp11 Principal: Yes . . BP BP Planning Report Date: 9/2/2004 Time: 12:53:59 Page: 1 Co-ordlnate(NE) Reference: Well: Plan MPG-19, True North Vertical (TVD) Reference: 4: 03 8/29/1989 00:00 59.3 Section (VS) Reference: Well (0.ooN,O.ooE.72.26Azi) Survey Calculation Method: Minimum Curvature Db: Oracle Date Composed: Version: Tied-to: 8/19/2004 53 From Well Ref. Point Field: Milne Point North Slope UNITED STATES Map Systent:lS State Plane Coordinate System 1927 Geo DatumNAD27 (Clarke 1866) Sys Datum:Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska. Zone 4 Well Centre bggm2004 Site: M PI G Pad TR-13-10 UNITED STATES: North Slope Site Position: Northing: 6011726.58 ft From: Map Easting: 556397.19 ft Position Uncertainty: 0.00 ft Ground Level: 0.00 ft Wcll: Plan MPG-19 Latitude: 70 Longitude: 149 North Reference: Grid Convergence: 26 33.685 N 32 24.162 W True 0.43 deg Slot Name: Well Position: +N/-S 2278.89 ft Northing: 6014011.91 ft Latitude: +E/-W 889.13 ft Easting: 557268.97 ft Longitude: Position Uncertainty: 0.00 ft Casing Points MD ft 4054.36 8449.00 Formations MD ft 1926.07 6149.01 6853.08 6893.90 7016.35 7402.36 7517.40 7602.58 7676.10 7744.40 7878.28 7971.18 8069.54 8176.10 8252.61 Targets TVD ft 2909.27 4532.15 TVD ft 1859.27 3665.27 3929.27 3945.27 3993.27 4144.27 4189.27 4222.27 4249.27 4274.27 4323.27 4357.27 4393.27 4432.27 4460.27 Diameter in 9.625 7.000 Formations BPRF TUZC Ugnu-MA Ugnu-MB1 Ugnu-MB2 Ugnu-MC SBF2-NA SBF1-NB SBE4-NC SBE2-NE SBE1-NF TSBD-Top OA TSBC-Base OA TSBB- Top OB SBA5-Base OB 70 26 56.097 N 149 31 58.052 W Hole Size in Name 12.250 8.500 9 5/8" 7" Lithology Dip Angle 'Dip Dlr,edion deg d~ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 !\fap Map <-' Latitude ,. -> ,c.... . Lôngitude ~- TV» +N/·S +E/-W Northing Easting Deg Min Sec DegMh~ Sec ft ft ft ft ft 2729.27 1501.94 1215.72 6015523.00 558473.00 70 27 10.868 N 149 31 22.343 W 2729.27 1501.94 1215.72 6015523.00 558473.00 70 27 10.868 N 149 31 22.343 W 2729.27 -175.20 1466.87 6013848.00 558737.00 70 26 54.373 N 149 31 14.977 W 2729.27 1501.94 1215.72 6015523.00 558473.00 70 27 10.868 N 149 31 22.343 W 2729.27 592.26 1595.57 6014616.35 558859.79 70 27 1.920 N 149 31 11.192 W 4214.27 2077.03 4727.58 6016125.00 561980.00 70 27 16.510 N 1492939.182W 4214.27 2077.03 4727.58 6016125.00 561980.00 70 27 16.510 N 149 2939.182 W 4214.27 629.27 4411.42 6014675.00 561675.00 70 27 2.273 N 149 2948.495 W 4214.27 2077.03 4727.58 6016125.00 561980.00 70 27 16.510 N 149 29 39.182 W 4214.27 1891.63 5029.61 6015941.94 562283.42 70 27 14.684 N 149 29 30.314 W 4222.27 1891.17 5049.13 6015941.64 562302.94 70 27 14.680 N 149 2929.741 W Name Description Dip. Dir. MPG-19 Fault 1 -Polygon 1 -Polygon 2 -Polygon 3 -Plan out by 985.80 at MPG-19 Fault 3 -Polygon 1 -Polygon 2 -Polygon 3 -Plan out by 354.39 at MPG-19T1.1 Company: BP Amoco Field: Milne Point Site: M PIG Pad Well: Plan MPG-19 WeUpath: MPG-19 Targets Name Description Dip. Dir. -Circle (Radius: 150) -Plan hit target MPG-19 Fault 2 -Polygon 1 -Polygon 2 -Polygon 3 -Plan out by 1808.92 at MPG-19 T2.2 -Circle (Radius: 150) -Plan hit target MPG-19 Fault 4 -Polygon 1 -Polygon 2 -Polygon 3 -Plan out by 862.88 at Plan Section Information MD ft 34.30 275.03 569.15 992.79 1092.79 1312.79 1852.79 1944.35 2864.35 3164.35 3294.35 6344.35 7024.50 7564.03 7602.58 7623.90 8176.10 8249.14 8449.14 Survey MD ft 34.30 100.00 200.00 275.03 300.00 400.00 500.00 569.15 600.00 700.00 800.00 900.00 992.79 1000.00 1092.79 1100.00 Inc:l deg 0.00 0.00 5.00 13.00 13.15 14.24 30.44 30.44 67.24 67.24 68.84 68.84 66.97 66.97 68.00 68.53 68.53 68.53 68.53 Jnc:l deg 0.00 0.00 0.00 0.00 0.42 Azim deg 0.00 0.00 120.00 100.00 91.18 68.24 68.24 68.24 68.24 68.24 62.90 62.90 92.24 92.24 91.00 91.72 91.72 91.72 91.72 Azim deg 0.00 0.00 0.00 0.00 120.00 2.12 3.82 5.00 5.54 7.36 9.26 11.19 13.00 13.00 13.15 13.15 120.00 120.00 120.00 116.66 109.27 104.85 101.93 100.00 99.36 91.18 TVD ft 34.30 275.03 568.77 986.95 1084.36 1298.27 1796.09 1875.03 2470.24 2586.32 2634.97 3735.77 3996.46 4207.51 4222.27 4230.17 4432.27 4459.00 4532.20 TVD. ft 34.30 100.00 200.00 275.03 300.00 399.97 499.83 568.77 599.50 698.86 797.81 896.22 986.95 993.97 1084.36 . BP BP Planning Report TVD ·ft 4359.27 4359.27 4359.27 4359.27 4359.27 4432.27 4454.27 4454.27 4454.27 4454.27 4454.27 +Nt-S ft 0.00 0.00 -6.41 -23.95 -26.14 -16.61 59.22 76.42 328.83 431.40 481.27 1776.87 1911.62 1892.18 1891.17 1890.70 1875.29 1873.25 1867.67 Sy. TVD ft -24.97 40.73 140.73 215.76 240.73 340.70 440.56 509.50 540.23 639.59 738.54 836.95 927.68 934.70 1025.09 90.38 1091.38 1032.11 . Date: 9/212004 Time: 12:53:59 Co-ordinate(NE) Reference: Well: Plan MPG Vertical (TVD) Reference: 4 : 03 8/29/1 Section (VS) Reference: Well (0.00N,0.00E,72.26Azi) .. Snrvey Calc:ulationMethod: Minimum Curvature . Dbi·· +Nt-S ft 2374.29 2374.29 2418.79 2374.29 1880.85 1875.29 3656.73 3656.73 5414.30 3656.73 5397.06 5582.59 2725.03 2725.03 1999.14 2725.03 1873.61 5778.70 5778.70 7184.30 5778.70 5638.51 +EL-W ft 0.00 0.00 11.11 74.14 96.59 146.77 336.72 379.80 1012.02 1268.94 1378.64 3910.86 4517.38 5013.54 5049.13 5068.93 5582.59 5650.53 5836.57 NtS ft 0.00 0.00 0.00 0.00 -0.05 -1.16 -3.75 -6.41 -7.75 -12.03 -16.21 -20.28 -23.95 -24.22 -26.14 -26.16 +Et-W ft Map Northing ft Map Easting ft 6016414.00 560907.00 6016414.00 560907.00 6016472.00 562664.00 6016414.00 560907.00 6015934.00 562650.90 6015929.86 562836.45 6016781.00 563026.00 6016781.00 563026.00 6016066.00 564437.00 6016781.00 563026.00 6015928.61 562892.37 <-- Latitude --><_:... Longitude -- Deg Min Sec Deg Min Sec 70 27 19.439 N 70 27 19.439 N 70 27 19.866 N 70 27 19.439 N 70 27 14.576 N 70 27 14.520 N 149 30 10.634 W 149 30 10.634 W 149 29 19.003 W 149 30 10.634 W 149 29 19.521 W 149 29 14.072 W 70 27 22.875 N 70 27 22.875 N 70 27 15.724 N 70 27 22.875 N 70 27 14.503 N 149 29 8.292 W 149 29 8.292 W 149 28 27.021 W 149 29 8.292 W 149 29 12.429 W TFO deg 0.00 0.00 120.00 328.52 -90.00 -90.00 0.00 0.00 0.00 0.00 -73.00 0.00 99.48 0.00 -48.43 51.62 0.00 0.00 0.00 DLS Build Turn deg/100ft deg/1 000 deg/1 OOft 0.00 0.00 1.70 2.00 2.00 2.50 3.00 0.00 4.00 0.00 4.00 0.00 4.00 0.00 4.00 4.00 0.00 0.00 0.00 EIW ft 0.00 0.00 0.00 0.00 0.08 2.01 6.50 11.11 13.60 23.96 37.78 55.05 74.14 75.73 96.59 98.23 0.00 0.00 1.70 1.89 0.15 0.49 3.00 0.00 4.00 0.00 1.24 0.00 ·0.28 0.00 2.67 2.49 0.00 0.00 0.00 DLS deg/10OO 0.00 0.00 0.00 0.00 1.70 0.00 0.00 0.00 -4.72 -8.82 -10.43 0.00 0.00 0.00 0.00 -4.10 0.00 4.31 0.00 -3.23 3.37 0.00 0.00 0.00 1.70 1.70 1.70 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.50 6013986.51 Target MPG-19T1.1 MPG-19 T2.2 MapN ft 6014011.91 6014011.91 6014011.91 6014011.91 6014011.86 CB-GYRO-SS CB-GYRO-SS CB-GYRO-SS Start Dir 1.7?/ CB-GYRO-SS 6014010.77 6014008.21 6014005.58 6014004.26 6014000.06 6013996.00 6013992.06 6013988.53 6013988.27 6013986.52 557270.98 CB-GYRO-SS 557275.50 CB-GYRO-SS 557280.12 Start Dir 2?/10 557282.63 CB-GYRO-SS 557293.02 CB-GYRO-SS 557306.87 CB-GYRO-SS 557324.17 CB-GYRO-SS 557343.28 CB-GYRO-SS 557344.88 CB-GYRO-SS 557365.75 Start Dir 2.5?/ 557367.39 CB-GYRO-SS . . BP BP Planning Report 1200.00 13.42 79.55 1188.72 1129.45 -24.13 121.02 2.50 6013988.71 557390.16 CB-GYRO-SS 1300.00 14.12 69.45 1285.86 1226.59 -17.74 143.85 2.50 6013995.27 557412.94 CB-GYRO-SS 1312.79 14.24 68.24 1298.27 1239.00 -16.61 146.77 2.50 6013996.43 557415.85 Start Dir 3?/10 1400.00 16.85 68.24 1382.28 1323.01 -7.95 168.47 3.00 6014005.26 557437.48 CB-GYRO-SS 1500.00 19.85 68.24 1477.18 1417.91 3.72 197.71 3.00 6014017.15 557466.62 MWD+IFR+MS 1600.00 22.85 68.24 1570.31 1511.04 17.22 231.52 3.00 6014030.91 557500.33 MWD+IFR+MS 1700.00 25.85 68.24 1661.40 1602.13 32.51 269.81 3.00 6014046.49 557538.49 MWD+IFR+MS 1800.00 28.85 68.24 1750.21 1690.94 49.54 312.47 3.00 6014063.85 557581.02 MWD+IFR+MS 1852.79 30.44 68.24 1796.09 1736.82 59.22 336.72 3.00 6014073.71 557605.19 End Dir : 1852 1900.00 30.44 68.24 1836.79 1777.52 68.09 358.93 0.00 6014082.75 557627.33 MWD+IFR+MS 1926.07 30.44 68.24 1859.27 1800.00 72.99 371.20 0.00 6014087.74 557639.56 BPRF 1944.35 30.44 68.24 1875.03 1815.76 76.42 379.80 0.00 6014091.24 557648.13 Start Dir 4?/10 2000.00 32.66 68.24 1922.45 1863.18 87.22 406.84 4.00 6014102.24 557675.08 MWD+IFR+MS 2100.00 36.66 68.24 2004.69 1945.42 108.30 459.64 4.00 6014123.73 557727.72 MWD+IFR+MS 2200.00 40.66 68.24 2082.76 2023.49 131.46 517.65 4.00 6014147.33 557785.55 MWD+IFR+MS 2300.00 44.66 68.24 2156.28 2097.01 156.58 580.57 4.00 6014172.93 557848.27 MWD+IFR+MS 2400.00 48.66 68.24 2224.90 2165.63 183.54 648.11 4.00 6014200.41 557915.59 MWD+IFR+MS 2500.00 52.66 68.24 2288.27 2229.00 212.21 719.92 4.00 6014229.63 557987.17 MWD+IFR+MS 2600.00 56.66 68.24 2346.10 2286.83 242.45 795.67 4.00 6014260.45 558062.67 MWD+IFR+MS 2700.00 60.66 68.24 2398.10 2338.83 274.12 874.97 4.00 6014292.71 558141.73 MWD+IFR+MS 2800.00 64.66 68.24 2444.02 2384.75 307.05 957.46 4.00 6014326.27 558223.95 MWD+IFR+MS 2864.35 67.24 68.24 2470.24 2410.97 328.83 1012.02 4.00 6014348.48 558278.34 End Dir : 2864 2900.00 67.24 68.24 2484.04 2424.77 341.02 1042.56 0.00 6014360.90 558308.77 MWD+IFR+MS 3000.00 67.24 68.24 2522.73 2463.46 375.21 1128.19 0.00 6014395.74 558394.14 MWD+IFR+MS 3100.00 67.24 68.24 2561.42 2502.15 409.40 1213.83 0.00 6014430.59 558479.50 MWD+IFR+MS 3164.35 67.24 68.24 2586.32 2527.05 431.40 1268.94 0.00 6014453.01 558534.43 Start Dir 4?/10 3200.00 67.66 66.76 2600.00 2540.73 444.00 1299.35 4.00 6014465.84 558564.75 MWD+IFR+MS 3294.35 68.84 62.90 2634.97 2575.70 481.27 1378.64 4.00 6014503.71 558643.74 End Dir : 3294 3300.00 68.84 62.90 2637.01 2577. 74 483.67 1383.33 0.00 6014506.15 558648.41 MWD+IFR+MS 3400.00 68.84 62.90 2673.10 2613.83 526.15 1466.36 0.00 6014549.26 558731.10 MWD+IFR+MS 3500.00 68.84 62.90 2709.19 2649.92 568.63 1549.38 0.00 6014592.37 558813.79 MWD+IFR+MS 3555.63 68.84 62.90 2729.27 2670.00 592.26 1595.57 0.00 6014616.35 558859.79 MPG-19 Fault 1 3600.00 68.84 62.90 2745.28 2686.01 611.11 1632.40 0.00 6014635.48 558896.47 MWD+IFR+MS 3700.00 68.84 62.90 2781.38 2722.11 653.59 1715.43 0.00 6014678.59 558979.16 MWD+IFR+MS 3800.00 68.84 62.90 2817.47 2758.20 696.06 1798.45 0.00 6014721.71 559061.85 MWD+IFR+MS 3900.00 68.84 62.90 2853.56 2794.29 738.54 1881.48 0.00 6014764.82 559144.53 MWD+IFR+MS 4000.00 68.84 62.90 2889.65 2830.38 781.02 1964.50 0.00 6014807.93 559227.22 MWD+IFR+MS 4054.36 68.84 62.90 2909.27 2850.00 804.11 2009.63 0.00 6014831.36 559272.17 9 5/8" 4100.00 68.84 62.90 2925.74 2866.47 823.50 2047.52 0.00 6014851.04 559309.91 MWD+IFR+MS 4200.00 68.84 62.90 2961.84 2902.57 865.98 2130.55 0.00 6014894.15 559392.60 MWD+IFR+MS 4300.00 68.84 62.90 2997.93 2938.66 908.46 2213.57 0.00 6014937.26 559475.28 MWD+IFR+MS 4400.00 68.84 62.90 3034.02 2974.75 950.94 2296.59 0.00 6014980.37 559557.97 MWD+IFR+MS 4500.00 68.84 62.90 3070.11 3010.84 993.42 2379.62 0.00 6015023.48 559640.66 MWD+IFR+MS 4600.00 68.84 62.90 3106.20 3046.93 1035.89 2462.64 0.00 6015066.60 559723.34 MWD+IFR+MS 4700.00 68.84 62.90 3142.29 3083.02 1078.37 2545.67 0.00 6015109.71 559806.03 MWD+IFR+MS 4800.00 68.84 62.90 3178.39 3119.12 1120.85 2628.69 0.00 6015152.82 559888.72 MWD+IFR+MS 4900.00 68.84 62.90 3214.48 3155.21 1163.33 2711.71 0.00 6015195.93 559971.40 MWD+IFR+MS 5000.00 68.84 62.90 3250.57 3191.30 1205.81 2794.74 0.00 6015239.04 560054.09 MWD+IFR+MS 5100.00 68.84 62.90 3286.66 3227.39 1248.29 2877.76 0.00 6015282.15 560136.78 MWD+IFR+MS 5200.00 68.84 62.90 3322.75 3263.48 1290.77 2960.78 0.00 6015325.26 560219.46 MWD+IFR+MS 5300.00 68.84 62.90 3358.85 3299.58 1333.25 3043.81 0.00 6015368.38 560302.15 MWD+IFR+MS 5400.00 68.84 62.90 3394.94 3335.67 1375.72 3126.83 0.00 6015411.49 560384.84 MWD+IFR+MS 5500.00 68.84 62.90 3431.03 3371.76 1418.20 3209.85 0.00 6015454.60 560467.52 MWD+IFR+MS · e BP BP Planning Report 5600.00 68.84 62.90 3467.12 1460.68 3292.88 0.00 6015497.71 560550.21 MWD+IFR+MS 5700.00 68.84 62.90 3503.21 3443.94 1503.16 3375.90 0.00 6015540.82 560632.90 MWD+IFR+MS 5800.00 68.84 62.90 3539.30 3480.03 1545.64 3458.93 0.00 6015583.93 560715.58 MWD+IFR+MS 5900.00 68.84 62.90 3575.40 3516.13 1588.12 3541.95 0.00 6015627.04 560798.27 MWD+IFR+MS 6000.00 68.84 62.90 3611.49 3552.22 1630.60 3624.97 0.00 6015670.15 560880.96 MWD+IFR+MS 6100.00 68.84 62.90 3647.58 3588.31 1673.08 3708.00 0.00 6015713.27 560963.65 MWD+IFR+MS 6149.01 68.84 62.90 3665.27 3606.00 1693.90 3748.69 0.00 6015734.40 561004.17 TUZC 6200.00 68.84 62.90 3683.67 3624.40 1715.56 3791.02 0.00 6015756.38 561046.33 MWD+IFR+MS 6300.00 68.84 62.90 3719.76 3660.49 1758.03 3874.04 0.00 6015799.49 561129.02 MWD+IFR+MS 6344.35 68.84 62.90 3735.77 3676.50 1776.87 3910.86 0.00 6015818.61 561165.69 Start Dir 4?/10 6400.00 68.49 65.26 3756.02 3696.75 1799.53 3957.48 4.00 6015841.62 561212.13 MWD+IFR+MS 6500.00 67.95 69.53 3793.13 3733.86 1835.21 4043.19 4.00 6015877.96 561297.55 MWD+IFR+MS 6600.00 67.52 73.83 3831.04 3771.77 1864.30 4131.01 4.00 6015907.72 561385.14 MWD+IFR+MS 6700.00 67.20 78.15 3869.56 3810.29 1886.64 4220.53 4.00 6015930.74 561474.47 MWD+IFR+MS 6800.00 66.99 82.49 3908.50 3849.23 1902.13 4311.30 4.00 6015946.93 561565.11 MWD+IFR+MS 6853.08 66.93 84.79 3929.27 3870.00 1907.54 4359.84 4.00 6015952.71 561613.61 Ugnu-MA 6893.90 66.91 86.57 3945.27 3886.00 1910.37 4397.29 4.00 6015955.83 561651.02 Ugnu-MB 1 6900.00 66.91 86.83 3947.66 3888.39 1910.70 4402.89 4.00 6015956.20 561656.62 MWD+IFR+MS 7000.00 66.95 91.18 3986.87 3927.60 1912.29 4494.85 4.00 6015958.50 561748.56 MWD+IFR+MS 7016.35 66.96 91.89 3993.27 3934.00 1911.89 4509.89 4.00 6015958.21 561763.60 Ugnu-MB2 7024.50 66.97 92.24 3996.46 3937.19 1911.62 4517.38 4.00 6015958.00 561771.09 End Dir : 7024 7100.00 66.97 92.24 4025.99 3966.72 1908.90 4586.81 0.00 6015955.81 561840.54 MWD+IFR+MS 7200.00 66.97 92.24 4065.11 4005.84 1905.29 4678.77 0.00 6015952.91 561932.52 MWD+IFR+MS 7300.00 66.97 92.24 4104.23 4044.96 1901.69 4770.73 0.00 6015950.02 562024.49 MWD+IFR+MS 7400.00 66.97 92.24 4143.35 4084.08 1898.09 4862.70 0.00 6015947.12 562116.47 MWD+IFR+MS 7402.36 66.97 92.24 4144.27 4085.00 1898.00 4864.87 0.00 6015947.05 562118.64 Ugnu-MC 7500.00 66.97 92.24 4182.46 4123.19 1894.48 4954.66 0.00 6015944.22 562208.45 MWD+IFR+MS 7517.40 66.97 92.24 4189.27 4130.00 1893.86 4970.66 0.00 6015943.72 562224.45 SBF2-NA 7564.03 66.97 92.24 4207.51 4148.24 1892.18 5013.54 0.00 6015942.37 562267.34 Start Dir 4?/10 7581.48 67.44 91.68 4214.27 4155.00 1891.63 5029.61 4.00 6015941.94 562283.42 MPG-19 Fault 3 7600.00 67.93 91.08 4221.30 4162.03 1891.21 5046.74 4.00 6015941.66 562300.55 MWD+IFR+MS 7602.58 68.00 91.00 4222.27 4163.00 1891.17 5049.13 4.00 6015941.64 562302.94 MPG-19T1.1 7623.90 68.53 91.72 4230.17 4170.90 1890.70 5068.93 4.00 6015941.32 562322.74 End Dir : 7623 7676.10 68.53 91.72 4249.27 4190.00 1889.24 5117.49 0.00 6015940.23 562371.30 SBE4-NC 7700.00 68.53 91.72 4258.02 4198.75 1888.58 5139.72 0.00 6015939.74 562393.53 MWD+IFR+MS 7744.40 68.53 91.72 4274.27 4215.00 1887.34 5181.03 0.00 6015938.82 562434.84 SBE2-NE 7800.00 68.53 91.72 4294.62 4235.35 1885.78 5232.74 0.00 6015937.66 562486.56 MWD+IFR+MS 7878.28 68.53 91.72 4323.27 4264.00 1883.60 5305.56 0.00 6015936.04 562559.39 SBE1-NF 7900.00 68.53 91.72 4331.22 4271.95 1882.99 5325.76 0.00 6015935.59 562579.59 MWD+IFR+MS 7971.18 68.53 91.72 4357.27 4298.00 1881.01 5391.97 0.00 6015934.11 562645.81 TSBD-Top OA 7976.65 68.53 91.72 4359.27 4300.00 1880.85 5397.06 0.00 6015934.00 562650.90 MPG-19 Fault 2 8000.00 68.53 91.72 4367.82 4308.55 1880.20 5418.78 0.00 6015933.51 562672.62 MWD+IFR+MS 8069.54 68.53 91.72 4393.27 4334.00 1878.26 5483.47 0.00 6015932.07 562737.32 TSBC-Base OA 8100.00 68.53 91.72 4404.42 4345.15 1877.41 5511.80 0.00 6015931.44 562765.65 MWD+IFR+MS 8176.10 68.53 91.72 4432.27 4373.00 1875.29 5582.59 0.00 6015929.86 562836.45 MPG-19 T2.2 8200.00 68.53 91.72 4441.02 4381.75 1874.62 5604.82 0.00 6015929.36 562858.68 MWD+IFR+MS 8236.21 68.53 91.72 4454.27 4395.00 1873.61 5638.51 0.00 6015928.61 562892.37 MPG-19 Fault 4 8249.14 68.53 91.72 4459.00 4399.73 1873.25 5650.53 0.00 6015928.34 562904.39 MWD+IFR+MS 8252.61 68.53 91.72 4460.27 4401.00 1873.15 5653.75 0.00 6015928.27 562907.62 SBA5-Base OB 8300.00 68.53 91.72 4477.62 4418.35 1871.83 5697.84 0.00 6015927.29 562951.71 MWD+IFR+MS 8400.00 68.53 91.72 4514.22 4454.95 1869.04 5790.86 0.00 6015925.21 563044.74 MWD+IFR+MS 8449.00 68.53 91.72 4532.15 ~ 4472.88 1867.67 5836.44 0.00 6015924.19 563090.33 7" · - BP BP Planning Report 68.53 91.72 4532.20 4472.93 1867.67 5836.57 0.00 6015924.19 563090.45 Total Depth: 8 COMPANY DETAfLS SURVEY PROGRAM BPA100Cú Depth Fm D<:pth To SurveylPia..n Tool if>t; 34.30 1500.00 CB.QYRQ.SS 1500.00 8449.14 MWD+JFR+MS " .. - - - WELLPATH DETAILS From Colour ToMD Mro~¡9 0 - 250 Rig: 250 500 Ref. Dawm: 4: 03 8/2911989 00:00 5917ft 500 750 Origin Origin. ~::nfvD "'-NI-S +Ef·W 750 1000 72.lff 0.00 0.00 34,30 1000 1250 1250 1500 1750 2000 2250 3250 3500 ANTI.cOLLISION SETTINGS WELL DETAILS """" +Ni-S +f3j¥W Northing ""'""" Latitude Loo¡¡i""" SIQt PlanMPG¥19 2278.&9 889. 6014011.'}1 551268.97 10"2656JJ97N 149°3!'58.052W NiA Wpl SECTION DETAJLS TVD +E!¥W Dleg TF8J;:e vSec Target Ari "'" Mf) "'" I 2 3 4 , 6 7 , 9 10 II 12 13 14 15 16 17 18 19 . BP Anticollision Report Date: 91212004 Company: BP Amoco Field: Milne Point Reference Site: M Pt G Pad , Reference Well: Plan MPG-19 Reference WeUpatlUPG-19 GLOBAL SCAN APPLIED: AU wellpaths within 200'+ 100/1000 of reference Interpolation Method\.1D Interval: 25.00 ft Depth Range: 34.30 to 8449.14 ft Maximum Radius:1041.48 ft Survey Program for Definitive Well path Date: 8/19/2004 Validated: No Planned From To Survey ft ft 34.30 1500.00 Planned: MPG-19Wp11 V52 1500.00 8449.14 Planned: MPG-19Wp11 V52 Casing Points MD ft 4054.36 8449.00 TVD ft 2909.27 4532.15 Diameter in 9.625 7.000 Hole Size in 12.250 8.500 Name 9 5/8" l" Summary <----.-....-.--. Offset Well path ---..-.-.----..> Site Well Wellpath MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPtGPad MPG-01 MPG-02 MPG-03 MPG-03 MPG-04 MPG-04 MPG-06 MPG-09 MPG-10 MPG-11 MPG-12 MPG-16 MPG-16 MPG-16 MPG-16 MPG-18 MPG-18 MPG-18 MPG-B MPG-01 V1 MPG-02 V1 MPG-03 V1 Plan MPG-03A VO Plan: MPG-04 V1 Plan MPG-04A VO Plan: MPG·06 V1 MPG-09 V2 MPG-10 V4 MPG-11 V2 MPG-12 V5 MPG-16 V6 MPG-16L1 V4 MPG-16PB1 V9 MPG-16PB2 V2 MPG-18 V6 MPG-18L 1 V3 MPG-18PB1 V2 MPG-B VO . Time: 12:22:01 Page: 1 Reference: Error Model: Scan Method: Error Surface: Tool Name Co-ordinate(NE) Reference: Well: Plan MPG-19. True North Vertical (TVD) Reference: 4 : 03 8/29/1989 00:00 59.3, Db: Oracle Principal Plan & PLANNED PROGRAM ISCWSA Ellipse Trav Cylinder North Ellipse + Casing Reference MD ft 398.73 1403.34 323.39 323.39 381.19 385.31 3114.47 831.05 300.95 6662.72 354.53 2052.04 2052.04 2052.04 2052.04 3728.78 3728.78 3728.78 38.83 Offset MD ft 400.00 1400.00 325.00 325.00 375.00 400.00 3050.00 825.00 300.00 6575.00 350.00 2075.00 2075.00 2075.00 2075.00 3675.00 3675.00 3675.00 19.90 Camera based gyro single shots MWD + IFR + Multi Station Allowable Devlatioø ft . 50.35 Pass: Major Risk 8.97 Pass: Major Risk 173.39 Pass: Major Risk 173.39 Pass: Major Risk 230.74 Pass: Major Risk 230.76 Pass: Major Risk 48.98 Pass: Major Risk 23.85 Pass: Major Risk 84.47 Pass: Major Risk 40.05 Pass: Major Risk 204.00 Pass: Major Risk 234.60 Pass: Major Risk 234.74 Pass: Major Risk 234.76 Pass: Major Risk 234.76 Pass: Major Risk 161.86 Pass: Major Risk 161.99 Pass: Major Risk 161.88 Pass: Major Risk No Offset Stations Site: MPtGPad Well: MPG-01 Rule Assigned: Major Risk Wellpath: MPG-01 V1 Inter-Site Error: 0.00 ft Reference Offset Semi"Major Axis Ctr-Ctr . No-Go, Allowabl~ .. MD TVD MD TVD Ref Offset TFOfAZI TFO·ØS Casing/HBlstanceArea Devlatlòn . Warni..1 ft ft ft ft ft ft deg deg in ft ft ft 50.00 50.00 50.00 50.00 0.04 0.05 352.52 352.52 60.09 1.31 58.77 Pass 75.00 75.00 75.00 75.00 0.09 0.10 352.66 352.66 59.98 1.90 58.07 Pass 100.00 100.00 100.00 100.00 0.15 0.16 352.91 352.91 59.78 2.49 57.29 Pass 124.99 124.99 125.00 124.99 0.24 0.17 353.20 353.20 59.56 3.05 56.51 Pass 149.99 149.99 150.00 149.99 0.32 0.19 353.48 353.48 59.36 3.60 55.75 Pass 174.99 174.99 175.00 174.99 0.41 0.20 353.74 353.74 59.18 4.16 55.02 Pass 199.99 199.99 200.00 199.99 0.50 0.22 353.99 353.99 59.03 4.71 54.31 Pass 224.99 224.99 225.00 224.99 0.55 0.26 354.23 354.23 58.89 5.24 53.65 Pass 249.98 249.98 250.00 249.98 0.59 0.31 354.50 354.50 58.77 5.76 53.01 Pass 274.98 274.98 275.00 274.98 0.64 0.35 354.79 354.79 58.66 6.28 52.38 Pass 299.73 299.73 300.00 299.98 0.65 0.39 355.02 235.02 58.61 6.68 51.93 Pass 324.49 324.49 325.00 324.98 0.68 0.50 355.13 235.13 58.69 7.34 51.36 Pass 349.24 349.23 350.00 349.98 0.71 0.60 355.11 235.11 58.89 7.99 50.90 Pass 373.99 373.97 375.00 374.97 0.74 0.71 354.96 234.96 59.21 8.65 50.56 Pass Version: 2 Toolcode CB-GYRO-SS MWD+IFR+MS Ctr-Ctr' No·Go DistanceArea ft ft 59.65 9.30 50.17 41.21 180.80 7.41 180.80 7.41 241.58 10.84 241.67 10.90 134.39 85.40 38.39 14.54 90.60 6.13 351.88 311.83 210.63 6.63 273.48 38.87 273.48 38.74 273.48 38.72 273.48 38.72 262.23 100.37 262.23 100.24 262.23 100.35 149.79 I 149 32 00 \Ii Area of Review / MPU G-19 1-WINJ Proposed 2041920 SFD 9/29/2004 550,000 I TERRIE L HUBBLE BP EXPLORATION AK INC PO BOX 196612 MB 7-5 ANCHORAGE, AK 99519-6612 89-6/1252 147 "Mastercard Check" DATE 09·;Z ö-()Cf -CL- $ /GO.DD --- --. ..-...----- .." "====~~--Ð0I::i:AR'S First Natíona Bank Alaska Anchorage, AK 99501 MEMOJ~\ t6 ~ I q; ~ ~~ . "-... ./. i j' /..... , f\L{ ~ . I: ~ 25 2000bOI:gg ~1,1I'b 2 2 711' ~ 55 bill 0 ~l, 7 . . . TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME If/¡/d r; -- /9 PTD# ZD /"- 11' Z- ~evelopment V Service Exploration Stratigraphic CHECK WßA T ADD-ONS ~'CLUE"· APPLIES (OPTIONS) MULTI Tbe permit is for a new weUboresegment of LATERAL existing well . Permit No, API No. . (If API num ber Productionsbould continue to be reponed as last two. (2) digits a function' of tbe origiDal API Dumber. stated are between 60-69) above. PJLOT HOLE ]n accordance witb 2.0 AAC 25.DD5(f), all (PH) records, data and logs acquired for tbe pilot bole must be dearly differentiated in botb name (name on permit plus PH) and API Dum ber (5.0 - 7.0/80) from records, data and logs acquired for well (name on permit). , SPACING The permit is approved subject ·to fuD EXCEPTION compliance witb 2.0 AAC 25.0SS~ Approval to perforate and produce is contingent upon issuance of ~ conservation order approving a spa ciog ex ception. (Company Name) assumes tbe liability of any protest to the spacing .exception tbat may occur. DRY DITCH All dry ditch sample sets submitted to tbe SAMPLE Commission must be in no greater than 3D' sample intervals from below tbe permafrost or from where samples are first caught and 10' sample intervals through target zones. Field & Pool MILNE POINT, SCHRADER BLFF OIL - 525140 Well Name: MILNE PT UNIT SB G-19 Program SER Well bore seg PTD#: 2041920 Company BP EXPLORATION (ALASKA) INC Initial ClasslType SER / PEND GeoArea 890 Unit 11328 On/Off Shore On Annular Disposal 1 P~rmit fee attached , , , , , , , , , , , , , , , , , , _ _ , , , , , , , , , , , , .Y~s, , , , , _ , , , , , , , _ , , _ , , , , , , , , , , , , _ _ , _ , , , , , , , , , , , _ _ _ " ,,"'" _ _ , 2 .Leas~_numberappropriale, ,_", _"", _, _"', Xes"", _Surfaœloça,tioninADL,025906,topprod,iot.a,ndJDjnADLQ2S51.8", ,,'" _", 3 _U,n[que well,n,am~,a[ld oumb,er , , , , , , , , , , , , , , , , , , _ _ , , , , , , , , , , , , , , , _ , , .Y~s , , , , , , , , , , , , , _ _ , , , , , , , , , , , , , _ _ , , , , , , , , , , , , _ , _ , , , , , , , , , , , ' , _ _ , , , , , , , , , , _ _ , , , 4 WelllQcat~d in,a,define~,pool , , , , , , , , , , , , , , , , , , , , , .Y~s, , " ,MiJnePoint Schrader, Sluff Oil PQol (5251<10), gO,verned by CO 4Z7. , , , , , , , , , , , _ , , , , , , , _ , , , , _ , , , 5 WelUQcaled pr,operdistance, from driJling unit.b,ound,aty, , , , , , , , , , , , , , , , , , , , , , , , Xes, , , , , , , , , , , _ , , , , , , , , , , , , , , , , , , , , , , _ , , , , , , , , , _ , , , , 6 WelUQcated proper ,distance, from otlJer wells , _ _ , , , , , , , , , , , .Y~s , , , , , , _ , , , , _ , , , , , , , , _ , , , , _ _ , _ , , , , , , , , , , , , , , _ _ _ , 7 ,Sufficient acreag.e,ayailable indrilJiog unit , , , , , , , , , , , , , " ","" .Y~s , , , , , CO <177' specifiesgove,rr¡mentaJ Qtr-Qtr-Qtu~eçtio,n; proposed well,cooform,s.tQ this requirement., , , , , , 8 Ifd~viated. js, wellbQre platiocJuded , , , , , , , , , , , , , , , , , , , , , , , , , , , .Y~s , , , , , , , , , , , , , , , , , , , , , , , , , , , , _ , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , _ , , , , , _ 90,perator onl~ affected party, , , , , , , , , , , , , , , , , _ , , , , , , ,_ ,," .Y~s , , , , , _ , , , , , , , , , , , _ , , , , , , , , , , _ , _ , , , , , , , , , , , , _ , , , , , , , , , , , , , _ , , , 10 ,O,perator has,appropriateJ:~ond inJorœ , , , , , , , , , , , , , , _ , , _ , , , _ , , , , , , , ' , , _ _Y~s , , , , , , , , , _ , ' , , _ , , _ , , , , , , , , , , , , _ _ _ , , , , , , , , _ ' , _ _ _ , _ , , , , , , , _ _ _ _ , _ , , , , , , , , , _ , , , 11 P~l'TTJil c,ao be issued witlJQut CO,nservation order, , , , , , , , , , , , , , , , , , , .Y~s , , , , , , , , , , , , , , _ , _ , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , Appr Date 12 Permilc.a[l be issued witlJQut actmioistratille,a,pproval , , , , , , , , , _ , , , , , , , , , , , , , , , Xes, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , SFD 9/30/2004 13 Can permit be approved before 15-day wait Yes 14 WelUQcaled within area and,strataauthorized by.lojectioo Ord~r # (putlO# in,cpmm~ots),(ForY~s , , , , , ,8rea Injection Qrder No._1.0oS , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , _ 15 ,AJlwells_within.1l4,mile,area,ofreyiewid~otified(Forservjq:¡.w.elJonl~)." _ _ _ _"""" .Y~s, _"" ,MPUß,.1.1,MPU,G_-1.6J..1"""""" _ _""""""" _ _""", _'" _, _""" _ _, 16 Pre-produced i[ljector; ~uratiQnof pre-,pro~uctioo I~Ss. than_:3 montlJs (For,service well QnJy) , No, , , , , , _ _ Skip Coyner, BP,9/30/2QO,4; well will noLbe pre~prQduce,d, , , , , , _ , , _ , , _ , 17 ACMP,Fïndjngof Con,sisle[lCy,h_as bee,n,is.sued, for.tlJis project. _ , , , , , , , "NA """ Well drilled frQm exjs.tiog pad, , _ _ , , , , , , , , , , , , , , , , , _ _ , , , , , , , , _ , , , Administration Engineering Appr Date TEM 10/5/2004 ~PVJ\.o( +5 Geology Appr SFD Date 9/30/2004 Geologic Commissioner: D"tS - - - - - - - - -- - - - - - - - 18 ,C,oodu,ctor strin.gprQvided , , , , _ _ , , , , , , , , _ , , , , , , , , , .Y~s , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , _ , , , , , , , _ , , _ , , 19 ,S,urf'aq:¡,cas.ingprotects. alLknown, USDWs , , , , , , , , , , , _ _ _ _ , , , , , , , , , , , , , , , _ NA. , , , , , ,811 aquifers ex~mpled.40CFR1<I7.1Q2.(b)(3). , , , , _ , , , , , , , , , , , , _ , , 20 ,CMTvoladequate.to circ,ulate_on,conductor& surfcsg , , _ , , , , _ , , , , , , , , , , , , " ,.Y~s"""", , , , , _ _ _ , , , , , , , , , , _ , , , , , , , _ , , 21 ,CMT v,ol adequate.to tie-inlQng _string to_surf' csg, , , , , , , _ , , , , , , , , , , , , , , , , , No, , , , , , ,All hydr,ocarbQn,z~)I)es,pJanoedto be ço,vered., , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , _ _ , 22 ,CMTwill coyer,a]l Koo.w.n.Pfoductiye hQrizon,s, , , , , , , , , , , , , _ _ , .Y~s , , , , _ _ _ , , , , , , , , , , , , , , , , , _ , , , , , , , , , , , , , , , , , , , , , 23 ,C,asiog desig[lS acteQuate for C,T, B&permafros!. , , , , , , , , , .Y~s _ , , , _ , , , , , , , , , , , , , , , , , , , _ _ , , , , , , , , , , , , , , , , , , _ , , , , , , , , , , , , , , , , 24 ,Mequaletankageor re,serve pit _, ",""""'" _ , , _ , , , _ , _ .Y~s , , Rig is_e,quippe,d.w.ith sleel,pjts. _ NQ rese,rvepjt,planoed, All waste to,approve,d,dispos,al wells. , , , , , , , 25 If.aJe-drilt has,a, 10-403 fQr abandon,ment beeo apprQved , , , , , _ _ _ , _, """"" NA. , , , , , , , , , , , , , , , , , , , , , , , , , _ , _ , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , _ _ , 26 A~equatewe]lbore separatio,n,pro.PQsed, , , , , , , , , , , , , , _ _ _ , , , , , , , , , , , , , , _ _ .Y~s , , , , , , , I?ro~imit~ analysis pertorme,d, ÇJose apprQaçhe,s,identjfj~d., TraveJiog. cylin.der iocluded., Gyros. likely., , _ , , , , , 27 If.diverterrequired, dQes iLmeel regulatioos, , , , , , , , , , , , _ , , , , , , , , , , .Y~s , , , , , , , , , , , , , , , , , _ , , , , , , , , _ _ , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , _ _ 28 ,Drilliogfluidprog.ramschematic&equiplis!.adequale" _""" _""""""", .Y~s, ,ExpectectBHP9.2EMW.,PlannedMW9.4~9.6ppg" """",""" 29 ,B,OPEs"d,o ,they meel regulatioo , , , , , , , , , , _ , , , , , , , Xes , , , , , , , , , , , , , , , , , , , , _ , , , , , , , , , , , , , , , , , , , , , , _ , , _ _ _ , , 30 ,BOPE,press ra,tiog ap,propriate;test lo(put psig in,comments) , , , , , , , , , , , , , , .Y~s , _ CalcuJatedMASP.16S7 psi., Planned BOPtesì press_ure,3,OOQ ps.i. 14,d,ay te,st iotervalrequested,. , , , , , , , _ , , 31 Choke manifold cQmplies. w/API RP-53 (May 84), , , , , , , , , , , , , , , , .Y~s , , , , , , _ , , , _ _ _ _ , , , , , , , , , , , , , , , , , , , , , , , , , , , _, ","'" _ , , 32 WQrk will occ,ur withouLoperationshutdQwn, , , , , , , , , , , _ , , , _ , , , , , , , , _ , , , , , , .Y~s , _ _ _ _ _ , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , _ _ , , 33 Is. pres.ence, Qf H2S gas, prob,able , , , , , , , _ , , , , , , , , , , , No, , , , , , , tl2S is no!.presenLoo MP G pad, .Rig. is equipped with seosorS. and _alarms.. , , , _ " "",""", 34 MeclJa,nicaLcoodilloo of wells within AOR yerified (for, s,ervjce welJ only), , , , , , , _ _ , , .Y~s , , , , , , , MPG~ 16 Jong striOg is bey,ood 1/4 mile., Cement job for MPG-1 '1 is a,cœpta.ble, no bood log available yet.. 35 Permil C.ao be issued w/o, hydrogen sulfide measures, , , , , , , , , , , , , , , , , .Y~s , , , , , , , , , , , , _ , , , , , , , , , , , , , , , , , , , _ _ , , , , , _ _ 36 ,D,atapreseoted on pote,ntial overpres,sure _zones, , , , , , , _ , , , , _ , , , , , .Y~s , , , " ,Expected, reservoir ,pre,ssure is9,2,ppg EMW; will ,be drilled witlJ 9.4,. 9.6 ppg mud., _ , , , , , , , , , , 37 ,Seismic,analysis Qf slJallow gas,zooes, _ _ , , , , , , , , , , _ , , , , , , , , , , , _ , , , , _ _ NA. , , , , , , , , , , , , , , , , , , , , , , _ _ ","""'" _ , , _ , , , , , , , , , _ , , , , , , , , , , , , , , , , 38 ,Seabed ,condjtioo survey (if off-shore) , _ , , , , , , , , , , , , _ , _ _ , , , , ,NA. , , , , , , , , , , , , , , , , , , , , , _ , , , ' , _ , , , , , , , , , , , , , , , , , , , , , , , , , , , , 39 ,CQntact namelphoneJor,weekly progress,reports [exploratotyonly] , , , , , , , , , , , ,NA. , , , , ,_ """ _ , , , , , , , _ , , , , , , , , _ _ , , _ _ , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , Date: Engineering Commissioner: ;;4/'1 Date 10 \.s ) ~ D D . . . . Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. . Sperry-Sun Drilling Services LIS Scan Utility . 0(0£/- /f¿ $Revision: 3 $ LisLib $Revision: 4 $ Thu Apr 14 09:19:11 2005 ttIJ/~' Reel Header Service name...... ..... ..LISTPE Date. . . . . . . . . . . . . . . . . . . . .05/04/14 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name.. ............. . UNKNOWN Continuation Number.... ..01 Previous Reel Name..... ..UNKNOWN Comments............. ....STS LIS Writing Library. Scientific Technical Services Tape Header Service name...... ...... .LISTPE Date. . . . . . . . . . . . . . . . . . . . .05/04/14 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............ ....UNKNOWN Continuation Number.... ..01 Previous Tape Name...... .UNKNOWN Comments....... ......... .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPG-19 500292322800 BP Exploration (Alaska) Inc. Sperry Drilling Services 14-APR-05 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0003361723 T. MCGUIRE E. VAUGHN MWD RUN 2 MW0003361723 T. MCGUIRE E. VAUGHN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 27 l3N 10E 1576 3338 MSL 0) 63.74 29.90 # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE BIT SIZE (IN) 12.250 8.750 CASING SIZE (IN) 20.000 9.625 DRILLERS DEPTH (FT) 114.0 3979.0 # REMARKS: . . 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS. 4. MWD RUN 2 COMPRISED DIRECTIONAL WITH DGR AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER PHONE CONVERSATION BETWEEN DENNIS URBAN (BP GEOSCIENTIST) AND BUSTER BRYANT (SDS) ON 4/13/05. MWD DATA ARE CONSIDERED PDC. 6. MWD RUNS 1 & 2 REPRESENT WELL MPG-19 WITH API#: 50-029-23228-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 8455'MD/4547'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). SLIDE = NON-ROTATED INTERVALS. $ File Header Service name... ......... .STSLIB.001 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .05/04/14 Maximum Physical Record. .65535 File Type........... .....LO Previous File Name. .... ..STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP RPD RPM RPS RPX FET $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 72.0 114.5 3944.0 3944.0 3944.0 3944.0 3944.0 STOP DEPTH 8418.0 8455.0 8410.5 8410.5 8410.5 8410.5 8410.5 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED D~H) 4IÞ --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ BIT RUN NO 1 2 MERGE TOP 72.0 3988.0 MERGE BASE 3988.0 8455.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type.. ..... ...........0 Data Specification Block Type.....O Logging Direction............. ....Down Optical log depth units.... .......Feet Data Reference Point... ......... ..Undefined Frame Spacing.... ................ .60 .1IN Max frames per record......... ... . Undefined Absent value......... ........ .....-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 72 8455 4263.5 16767 72 8455 ROP MWD FT/H 0.36 1865.28 224.698 16682 114.5 8455 GR MWD API 11.58 138.17 70.8345 16693 72 8418 RPX MWD OHMM 1. 28 2000 7.72773 8934 3944 8410.5 RPS MWD OHMM 1.24 2000 8.07734 8934 3944 8410.5 RPM MWD OHMM 0.22 2000 10.2345 8934 3944 8410.5 RPD MWD OHMM 0.03 2000 17.1109 8934 3944 8410.5 FET MWD HOUR 0.12 52.05 1. 02136 8934 3944 8410.5 First Reading For Entire File. ..... ....72 Last Reading For Entire File.......... .8455 File Trailer Service name............ .STSLIB.001 Service Sub Level Name. . . Version Number...... ... ..1.0.0 Date of Generation...... .05/04/14 Maximum Physical Record. .65535 File Type............... .LO Next File Name.... ..... ..STSLIB.002 Physical EOF File Header . Service name........... ..STSLIB.002 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation..... ..05/04/14 Maximum Physical Record..65535 File Type.............. ..LO Previous File Name... ....STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 . header data for each bit run in separate files. 1 .5000 START DEPTH 72.0 114.5 STOP DEPTH 3946.0 3988.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3):' RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ 04-NOV-04 Insite 66.37 Memory 114.0 3988.0 .1 69.3 TOOL NUMBER 061497 12.250 114.0 Water Based 9.20 120.0 8.5 680 9.8 .000 .000 .000 .000 .0 78.8 .0 .0 . . # Data Format Specification Record Data Record Type....... ... ...... ..0 Data Specification Block Type.....O Logging Direction.. ... .......... ..Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.. .................. .60 .1IN Max frames per record.......... ...Undefined Absent value.................. ....-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Service Order Units FT FT/H API Size 4 4 4 Nsam 1 1 1 Code Offset o 4 8 Channel 1 2 3 Name DEPT ROP GR MWD010 MWD010 Rep 68 68 68 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 72 3988 2030 7833 72 3988 ROP MWD010 FT/H 2.99 1461.27 213.92 7748 114.5 3988 GR MWD010 API 17.74 122.18 67.0868 7749 72 3946 First Reading For Entire File......... .72 Last Reading For Entire File.......... .3988 File Trailer Service name....... .... ..STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .05/04/14 Maximum Physical Record..65535 File Type........... .....LO Next File Name......... ..STSLIB.003 Physical EOF File Header Service name........... ..STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation... .., .05/04/14 Maximum Physical Record..65535 File Type... ... ......... .LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET 3 header data for each bit run in separate files. 2 .5000 START DEPTH 3944.0 3944.0 3944.0 3944.0 3944.0 STOP DEPTH 8410.5 8410.5 8410.5 8410.5 8410.5 " GR ROP $ . 3946.5 3988.5 8418.0 8455.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RES IS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction............. ....Down Optical log depth units..... ......Feet Data Reference Point............ ..Undefined Frame Spacing..... ..... .......... .60 .1IN Max frames per record............ . Undefined Absent value................. .....-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD020 GR MWD020 Units FT FT/H API Size 4 4 4 Nsam Rep 1 68 1 68 1 68 Code . 08-NOV-04 Insite 66.37 Memory 3988.0 8455.0 65.6 70.0 TOOL NUMBER 124724 127479 8.750 3979.0 LSND 9.30 56.0 8.5 350 8.0 4.700 3.100 5.100 3.900 71. 0 111. 2 71.0 71.0 Offset o 4 8 Channel 1 2 3 r;· . " . . RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3944 8455 6199.5 9023 3944 8455 ROP MWD020 FT/H 0.36 1865.28 234.044 8934 3988.5 8455 GR MWD020 API 11.58 138.17 74.0815 8944 3946.5 8418 RPX MWD020 OHMM 1. 28 2000 7.72773 8934 3944 8410.5 RPS MWD020 OHMM 1.24 2000 8.07734 8934 3944 8410.5 RPM MWD020 OHMM 0.22 2000 10.2345 8934 3944 8410.5 RPD MWD020 OHMM 0.03 2000 17.1109 8934 3944 8410.5 FET MWD020 HOUR 0.12 52.05 1. 02136 8934 3944 8410.5 First Reading For Entire File......... .3944 Last Reading For Entire File...... .... .8455 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number. ......... .1.0.0 Date of Generation. ......05/04/14 Maximum Physical Record. .65535 File Type.............. ..LO Next File Name.. ........ .STSLIB.004 Physical EOF Tape Trailer Service name. .......... ..LISTPE Date. . . . . . . . . . . . . . . . . . . . .05/04/14 Origin.................. .STS Tape Name.......... ......UNKNOWN Continuation Number..... .01 Next Tape Name..... ..... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .05/04/14 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number.... ..01 Next Reel Name.......... . UNKNOWN Comments.......... .......STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File