From:Josh Tempel
To:Rixse, Melvin G (OGC); Gabriela Keeton
Cc:Guhl, Meredith D (OGC); Roby, David S (OGC)
Subject:RE: PTD 215-007 SMU M-03 10-407 abandonment for redrill
Date:Thursday, April 10, 2025 4:02:30 PM
Some people who received this message don't often get email from josh.tempel@mhllcak.com. Learn why this isimportant
Good afternoon Mel,
Could you please clarify AOGCC’s request regarding the M-03 wellbore? According to
our review of the AOGCC archive, the M-03 wellbore was abandoned by the prior
operator. We also noted a related notice of violation issued to that operator on March 6,
2018.
Given that Mustang Holding did not perform the abandonment and does not possess the
full operational history, is AOGCC requesting that we file the Form 10-407 report to the
best of our knowledge based on the publicly available records?
Thank you for your guidance.
Best regards,
Josh
From: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>
Sent: Monday, April 7, 2025 3:56 PM
To: Josh Tempel <josh.tempel@mhllcak.com>; Gabriela Keeton <Gabriela.K@mhllcak.com>
Cc: Guhl, Meredith D (OGC) <meredith.guhl@alaska.gov>; Roby, David S (OGC)
<dave.roby@alaska.gov>
Subject: PTD 215-007 SMU M-03 10-407 abandonment for redrill
Josh, Gabriela,
AOGCC does not have record of the abandonment 10-407 for well SMU M-03,
PTD(215-007). This report is required per:
20 AAC 25.010. Re-entry of a suspended well.
(a) Before re-entering a suspended well to conduct completion operations, the operator
shall submit and obtain the commission's approval of an Application for Sundry
Approvals (Form 10-403). The Application for Sundry Approvals must set out the current
condition of the well and the proposed program for completion operations.
(b) Before re-entering a suspended well to conduct drilling operations, the operator shall
submit and obtain the commission's approval of an application for a Permit to Drill (Form
10-401) in conformance with 20 AAC 25.005.
(c) The operator shall file with the commission within 30 days after completion,
abandonment, or suspension of the well a Well Completion or Recompletion Report and
Log (Form 10-407) and all information required by 20 AAC 25.070(3) and 20 AAC 25.071.
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-297-8474 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain
confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or
federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the
AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov).
cc. Meredith Guhl, Dave Roby
�ll���el1��� ��D el$De�ort
Suspended _ —Inspection .
|nspecL0u: susGD[210715161430
Date inspected: 7/15/2021 ~
Inspector: Guy Cook Type ofInspection
VVeUName:
SOUTHERN MKUVEA[HUNIT K8-08 ^
Permit Number:
2150070
Suspension Approval:
Sundry ' # 318-112 '
Suspension Date:
4/27/2015 '
Location Verified?
EVI
if Verified, How?
Other (specify in comments)
Offshore?
11
Subsequent
Date AO6L[Notified: 7/22/2021
Operator Mustang Holding, LLC
Operator Rep: Ruo[o|ee
Wellbore Dia�ramAvaU7 E]
Photos Taken? L|
Well Pressures (psi): Tubing: O - Fluid inCellar? 0
|A: 20 BPV|ngaUe6? El
'
OA: U VRP!ug(s) installed? E]
Wellhead Condition
Good condition
Condition ofCellar
Novisible garbage ordebris and dry. ~
Surrounding Surface Condition
Both inside and outside of the wellhouse was well kept with no signs of hyrocarbons or debris.
Comments
Location was verified by several recent visits for wellhead pressure monitoring.
Supervisor Comments
�
Monday, July Z6'l021
Regg, James B (CED)
From: Dan Gleason <DGleason@br cak.com>
p
Sent: Tuesday, January 12, 2021 10:12 AM C
To: Harry Bockmeulen; DOA AOGCC Prudhoe Bay; Colegrove, Dorothy L
Cc: Ind Foreman, AES; NS DOT Pipeline Compliance; Regg, James B (CED)
Subject: Mustang Pad and Pipeline January '21 Surveillance Report.
Attachments: 210111 ASRC Pad Surveillance Report.pdf; Cap on SSSV jpg; Cap Removed from
SSSV jpg; Cap Removed SSSVjpg
W,
Here is the January 2021 Well, Pipeline, and Pump Maintenance and Surveillance Report for your information. The cap
on the SSSV was for Well M-03. Table 5 was modified to include he Rev 6 table that had the correct MAWP for I/A and
O/A on the wells.
Please let me know if you have any questions or comments.
Regards,
VIZ p'-55ws
Daniel Gleason
DJ Gleason Management Services (under contract to BRPC)
Cell Phone: (907) 980-1958
Office Phone: (907) 865-5833
1
0Yv P� 7- fb
&4ie, r5-)
SMU M-03 SSV Actuator
PTD 2150070
Photos courtesy of DJ Gleason Mgt Services
Email dated 1/12/2021
Follow-up to AOGCC Inspection dated 11/15/2020 (observed shipping cap installed on SSV keeping the valve open
araC t ( r
Table 1: Pressure Readings and Notes for Pipeline inspections
y
Tie in Spool Sales 011 Pipeline Seawater Pipeline
Date Ambient
As As Left Date AmbientAs As Left Rate Ambient As As Left
1YIC
Temp Deg. Found Pressure ! Temp Found Pressure iernp Found Pressure
F. ' Pressure psig Deg. F. Pressure psig Deg. F- Pressure psig
psig psigIgo
psig
tatsati - 3° 5 a15 �1,3° S ��1 �1,3
°
i� l l�„`r�t
Notes: (Maintain between 7 to 10 psig. Maximum Pressure is 50 psig, (MAWP of Pipeline is 2.064
1
13 Rev 5
Table 2: Pressure Readings and Notes for LACT Module and On -Pad Piping Inspections
14 Rev 5
LACI Mo u e
On -Pad Piping
1 Date
Ambient
Temp Deg.
F.
As
Found
Pressure
psig
As Left
Pressure
psig
Date
Ambient
Temp
Deg. F.
AsAs
Found
Pressure
psig
Left
Pressure
psig
`
5
`/a
►� s
I
3 0
�,,r--
a e
_ 6
3
-• S�'
C
/ D
S b
D �l
14 Rev 5
Table 3: LACT Module Sampling Skid Pump and Crude Ail Sales Pump flotations, Greasing, and Inspections
LACT Module Sampling Skid Pump
Crude ail Sales Pump
Date Ambient Motor Motor
Date Ambient Motor Motor
i Temp j and j Greased
k Temp and Greased
Deg. F. I Pump j Yes/No?
" Deg. F. Pump Yes/No?
Rotations
Rotations
1p
1g
rox�L
13
E
,
15 Rev 5
. ...
16 Rev
Table 5: Pressure Readings and Notes for Well Inspections
North 'Tarn
1A
M -01A
M-02 M-03
Date
Time
WH
Press.
I/A
Press.
O/A
Press.
Date
Time
WH
Press.
I/A
Press.
O/A
Press.
Date WH
Time Press.
I/A
Press.
O/A Date
Press. Time
WH
Press.
I/A
Press.
O/A
Press.
iq
lCh�
cam}
��q
70
-
-
,afQl0
ISS
l D-lCt2,l
(2oo
_
3'ZO(Dn
`����5
dao
Jioa
rajs
3o
"15
,3Od
a
j 14;
tS _
b
'
ib �(
��o '
`� I6a0
-30
�
17 Rev 5
Table 5 Notes:
(Maximum O/A is 1000 psig and I/A pressures are 2000 psig.)
Page 18 Rev
Suspended WellInspection Review Report
|nspectNo: susGDC201114124839
Date Inspected: 1I/15/2020 '
Inspector: Guy Cook ' Type ofInspection
Well Name:
SOUTHERN M|LUVEACHUNIT K4f]3 -
Permit Number:
2150070 -
Suspension Approval:
^
Sundry ' # 318'112
Suspension Date:
�
4/27/2015 ' �
Location Verified?
141
If Verified, How?
LAT/ LONG ^
Offshore?
El
Subsequent I
Date AOGCINotified: 11/5/20I0
Operator: Brooks Range Petroleum
Operator Rep: Tony]enson
VVe||bn/e Diagram Avail?
Photos Taken?
Well Pressures (psi): Tubing:
U ^
_
Fluid in Cellar?
[]
|A:
60 '
DPV!nsta||ed?
El
OA:
0'
VR Plug(s) Installed?
11
Wellhead Condition
�
The wellhead looked good and was well protected inaweUhoune. Nosigns ofleaking whatsoever. The shipping cap is still ~
installed onthe SSV keeping the valve inthe open position.
Condition ofCellar
The cellarwas empty and dry with no signs of hydrocarbons. Looked good.
/'
Surrounding Surface Condition
There bsmall amounts oftrash inthe weUhuusethat needs disposed of. Outside ofthe weUhnuse'the ground iscovered in-/
snow and cannot beseen.
Comments
_
This well looked the best out ofall four wells onMustang pad. The shipping cap being left onthe SSV baextremely bad ^
habit tnget into. These caps are for shipping use only and should be removed from the SSV after the tree is installed.
Supen/isorComments
Photos(9)attached
�
`5�~k�,-g(
Monday, December 28'202O
•
a
0
O cc
N Pr
rA
vo
L
O
a-�
O
1:
I
M
O
Well: SMU M-03 "Mustang"
END OF WELL REPORT
FOR
CLIENT: Brooks Range Petroleum
Corporation
WELL: SMU M-03
RIG: Nabors #16-E
DATES: March 24th, 2015-April 24th, 2015
JOB NUMBER: 14AKA0184
SERVICES: VISION Resistivity
Directional Drilling
PERFORM – APWD
Continuous Direction & Inclination
Well: SMU M-03 "Mustang"
TABLE OF CONTENTS
1 WELL SPECIFICATIONS .................................................................................. 4
2 SERVICES PROVIDED .................................................................................... 5
3 LOGS PROVIDED ........................................................................................... 6
4 WELL OBJECTIVES ........................................................................................ 7
5 FIELD CREW ................................................................................................. 8
6 SUPPORT STAFF ........................................................................................... 9
7 Run Summary – Schlumberger D&M Run # 1 .......................................... 10
COMMENTS RUN 1 .......................................................................................... 11
Depth Tracking Run 1 .................................................................................. 11
TALLY AND CORRECTIONS RUN 1 ..................................................................... 12
TALLY AND CORRECTIONS, COMMENTS RUN 1 .................................................. 13
TIME/DEPTH PLOT RUN 1 ................................................................................ 13
SURFACE SENSORS CALIBRATION .................................................................... 14
8 Run Summary – Schlumberger D&M Run # 2 .......................................... 16
COMMENTS RUN 2 .......................................................................................... 17
Depth Tracking Run 2 .................................................................................. 17
TALLY AND CORRECTIONS RUN 2 ..................................................................... 18
TALLY AND CORRECTIONS, COMMENTS RUN 2 .................................................. 19
TIME/DEPTH PLOT RUN 2 ................................................................................ 19
Surface Sensors Calibration ......................................................................... 20
9 Run Summary – Schlumberger D&M Run # 3 .......................................... 22
COMMENTS RUN 3 .......................................................................................... 23
Depth Tracking Run 3 .................................................................................. 23
TALLY AND CORRECTIONS RUN 3 ..................................................................... 24
TALLY AND CORRECTIONS, COMMENTS RUN 3 .................................................. 25
TIME/DEPTH PLOT RUN 3 ................................................................................ 25
SURFACE SENSORS CALIBRATION .................................................................... 26
10 Survey List ............................................................................................... 28
Well: SMU M-03 "Mustang"
1 WELL SPECIFICATIONS
Client: Brooks Range Petroleum Corporation
Field: North Tarn
Rig: Nabors #16-E
Contractor: Nabors
Job Number: 14AKA0184
Spud Date: 25-Mar-2015
Total Depth Date: 10-Apr-2015
Water Depth: 0 ft
Drill Floor Elevation: 109.6 ft
Latitude: 70° 14' 57.887" N
Longitude: 150° 16' 45.132” W
Coordinate System: NAD27 Alaska State Plane, Zone 4, US Foot
Northing: 5940851.670 ft
Easting: 465440.760 ft
Depth Reference: Driller’s Depth
Permanent Datum: Mean Sea Level
Depth Measured From: Drill Floor
Rotary Table Elevation: 109.6 ft
GeoMag Reference Values: Total G: 1001.99 mG
Total H: 57545.74 nT
Magnetic Dip: 80.812°
North Reference: True North
Magnetic Declination: 18.6728°
Grid Convergence: 0°
Total Correction: 18.808°
GeoMag Date: 01-Apr-2015
GeoMag Version: BGGM 2014
Well: SMU M-03 "Mustang"
2 SERVICES PROVIDED
MEASUREMENT WHILE DRILLING – TeleScope FROM (ft) TO (ft)
Continuous Survey 0.00 7231
LOGGING WHILE DRILLING FROM (ft) TO (ft)
Phase Shift Resistivity 160 7231
Attenuation Resistivity 160 7231
Natural Gamma Ray 160 7231
APWD 160 7231
SURFACE MEASUREMENTS – MaxWell FROM (ft) TO (ft)
Hole depth 160 7231
Penetration rate 160 7231
Pump pressure 160 7231
Surface weight on bit 160 7231
Surface total flow rate 160 7231
COMMUNICATION – MaxWell FROM (ft) TO (ft)
Company man display 160 7231
Rig floor display 160 7231
Data to InterACT 160 7231
Well: SMU M-03 "Mustang"
3 LOGS PROVIDED
GR-RES FROM (ft) TO (ft)
2 in./100 ft Measured Depth 160 7231
5 in./100 ft Measured Depth 160 7231
2 in./100 ft True Vertical Depth 160 7231
5 in./100 ft True Vertical Depth 160 7231
Drilling Mechanics FROM (ft) TO (ft)
2 in./1 hr Time Log 160 7231
5 in./100 ft Measured Depth 160 7231
Well: SMU M-03 "Mustang"
4 WELL OBJECTIVES
Well: SMU M-03 "Mustang"
5 FIELD CREW
MWD/LWD Engineers:
Theodor Russell
Jeff Ryan
Morgan Evangelesta
Vladislav Tsypin
Directional Drillers:
Michael McNulty
Ted Nevillle
Vance Ferguson
Jason Clegg
Well: SMU M-03 "Mustang"
6 SUPPORT STAFF
Operations Base: Schlumberger
Drilling and Measurements Division
PO Bo 340130
Prudhoe Bay, Alaska 99734-0130
United States
Tel: +1 (907) 659-2157
Operations Manager: Ankur Prakash
Directional Drilling Coordinator: John Burton
Field Service Manager: Carolina Pena
Sales Engineer: Abhishek Bhadoria
Field Quality Champion:
Product Delivery Manager: Carolina Pena
Well: SMU M-03 "Mustang"
7 Run Summary – Schlumberger D&M Run # 1
Sensor Offset from Bit (ft)
MWD D+I 69.29
MWD Vibration 66
ARC Gamma Ray 45
ARC Resistivity 44.83
ARC Pressure 42.5
Date In : 24-Mar-15
Date Out : 30-Mar-15
Hole Size (in.): 12.25
Depth In (ft) : 160
Depth Out (ft) : 2580
Drilled (ft) : 2360
Logged (ft) : 2360
Pumping Hours : 41.8
Drilling Hours : 22
BRT Hours : 114.8
Inclination In : 0.0
Inclination Out : 21.56
Azimuth In : 0
Azimuth Out : 118.84
Mud Type and Weight: WBM 9.1-9.7 ppg
Mud Viscosity (API; PV): 214 s/qt, 32 cP
Signal Strength @TD : 14 psi
Modulator Gap: 0.125
Telemetry: QPSK
Frequency (Hz): 10.5
Bit Rate (bps): 3
Configuration: 5 seconds
Flow range (gpm): 400-800
Pump Pressure (psi) : 1500
Flow Rate (gpm) : 500-700
Total Shocks (k): 0
WOB (klbf): 14.32
RPM : 65
Average ROP (ft/hr): 73
MWD/LWD Tool No : E1904/E5292
Tool MWD /LWD Failure : No
Reason POOH: Section TD
Well: SMU M-03 "Mustang"
COMMENTS RUN 1
The objective of the run was to spud the well and drill to the surface casing point
following the directional plan with a 2.5°/100ft dogleg severity (DLS).
The BHA was composed of a 12 ¼” Hughes VMD-3 bit, 9 ⅝” PDM with
adjustable bent housing set at 1.5°, 12 ⅛” NM stabilizer, ARCvision 825 LWD,
TeleScope MWD, NM UBHO, 12 ⅛” NM stabilizer, Bottleneck XO sub, 3 flex
NMDC, saver sub, 9 joints 5” HWDP, hydraulic drilling jars, and 8 joints 5”
HWDP. The expected DLS yield with the mud motor adjustable bent housing set
at 1.5° was 4° - 8°/100ft for 100% sliding.
The BHA yielded 2.2°-5.8°/100ft MO while sliding in the permafrost and 3.8°-
7.6°/100ft MO while sliding below the permafrost (most being ~6°/100ft) and
showed a slight dropping tendency when rotating. There were no observed
downhole problems, and the directional objectives were successfully
achieved. Low flow rates, below the mud motor specifications, were used to start
drilling below the conductor and were slowly increased to a final rate of 630 gpm
toward total depth of the section. We did not back ream while drilling.
After drilling to total depth for the casing point and circulating the hole clean the
rig back reamed every stand including HWDP. During this process some
surveys were taken to replace old surveys that had magnetic interference due to
solar flaring. The trip went very well with very minimal drag observed so the
decision was made to lay down the BHA and run casing.
The bit was graded 2-2-WT-A-E-1/16-NO-TD.
Casing was run to bottom without any reported issues.
Depth Tracking Run 1
The D&M crew installed a drawworks encoder and received the Hookload
and pump pressure via WITS from Canrig. The crew tracked depth following the
D&M-SQ-S016 Depth Control Standard v2.0 produced August 2, 2014 as per
attached Pipe Tally sheets.
Well: SMU M-03 "Mustang"
TALLY AND CORRECTIONS RUN 1
Schlumberger D&M Depth Tracking
TALLY AND CORRECTIONS, COMMENTS RUN 1
Well: SMU M-03 "Mustang"
All corrections applied to raw depth are documented as per the pipe tally.
TIME/DEPTH PLOT RUN 1
Time vs. Depth
Well: SMU M-03 "Mustang"
SURFACE SENSORS CALIBRATION
DRAWWORKS ENCODER SENSOR
Well: SMU M-03 "Mustang"
Pump Pressure
Well: SMU M-03 "Mustang"
8 Run Summary – Schlumberger D&M Run # 2
Sensor Offset from Bit (ft)
MWD D+I 56.79
MWD Vibration 53.5
ARC Gamma Ray 34.07
ARC Resistivity 33.9
ARC Pressure 31.57
PD Xceed D+I 13.7
Date In : 02-Apr-2015
Date Out : 08-Apr-2015
Hole size (in): 8.75
Depth In (ft) : 2580
Depth Out (ft) : 6365
Drilled (ft) : 3785
Logged (ft) : 3800
Pumping hours : 100.9
Drilling Hours : 46.2
BRT Hours : 159
Inclination In : 21.58
Inclination Out : 64.31
Azimuth In : 118.84
Azimuth Out : 183.97
Mud type and weight: WBM 9.7-10.4 ppg
Mud viscosity (API; PV): 61 s/qt, 17 cP
Signal Strength (psi) @TD : 2.6
Modulator Gap: 0.12
Telemetry: QPSK
Frequency (Hz): 10.5
Bit rate: 3bps
Configuration: 5 seconds
Flow range (gpm): 300-600
Pump Pressure (psi) : 1002
Flow Rate (gpm) : 350-550
Total Shocks: 1
WOB (klbf): 10900
RPM : 130
Average ROP (ft/hr): 31
MWD/LWD Tool No : E6813/E7436/DN490
Tool MWD /LWD Failure : No
Reason POOH: BOP Test
Well: SMU M-03 "Mustang"
COMMENTS RUN 2
The objective of the run was to drill the casing float equipment, cement, shoe and
drill to the intermediate casing point following the directional plan with a tangent
then a 3.0°/100ft dogleg severity (DLS) at the end.
The BHA was composed of a 8 ¾” Hycalog PDC SKH519M-B1C bit, 6 ¾” RSS
Xceed, arcVISION 675 LWD, TeleScope MWD, 8 1/2” NM stabilizer, 3 Flex
NMDC, saver sub, 9 joints 5” HWDP, hydraulic drilling jars, and 8 joints 5”
HWDP.
The BHA performed perfectly directionally, but another severe problem was
encountered: the topdrive would occasionally bounce so severely that WOB
fluctuated from 0 to 12 klbs and the drillpipe would vibrate in a standing wave
with about 6” magnitude. We reduced the problem significantly by dropping the
topdrive torque limit to equal drilling torque. The problem was eliminated
completely in the following run by adding lube to the mud. It was unrelated to
anything happening down hole.
3 or 4 episodes of brief pressure increases of about 100 to 300 psi were
observed. They all cleared up after a few minutes without any effort. Junk was
later found in the bit (black foam rubber like a floor mat and white/black plastic
like a guitar pick).
The bit was graded 1-1-WT-A-X-I-NO-BHA.
Depth Tracking Run 2
The D&M crew installed a drawworks encoder and hookload sensor. The
crew tracked depth following the D&M-SQ-S016 Depth Control Standard v2.0
produced 04-Aug-14 as per attached Pipe Tally sheets.
Well: SMU M-03 "Mustang"
TALLY AND CORRECTIONS RUN 2
Well: SMU M-03 "Mustang"
Schlumberger D&M Depth Tracking
Well: SMU M-03 "Mustang"
TALLY AND CORRECTIONS, COMMENTS RUN 2
All corrections applied to raw depth are documented as per the pipe tally.
TIME/DEPTH PLOT RUN 2
Time vs. Depth
Well: SMU M-03 "Mustang"
Surface Sensors Calibration
DRAWWORKS ENCODER SENSOR
Well: SMU M-03 "Mustang"
PUMP PRESSURE SENSOR
Well: SMU M-03 "Mustang"
9 Run Summary – Schlumberger D&M Run # 3
Sensor Offset from Bit (ft)
MWD D+I 60.42
MWD Vibration 57.13
ARC Gamma Ray 30.55
ARC Resistivity 36.21
ARC Pressure 32.58
PD Xceed D+I 13.7
Date In: 09-Apr-15
Date Out: 11-Apr-15
Hole size (in.): 8.75
Depth In (ft): 6365
Depth Out (ft): 7231
Drilled (ft): 2443
Logged (ft): 2508
Pumping hours: 22.4
Drilling Hours: 13.8
BRT Hours: 59.5
Inclination In: 64.31
Inclination Out: 67.52
Azimuth In: 183.97
Azimuth Out: 189.65
Mud type and weight: WBM 10.3-10.5 ppg
Mud viscosity (API; PV): 45 s/qt, 10 cP
Signal Strength (psi) @TD: 3.81
Modulator Gap: 0.13
Telemetry: QPSK
Frequency (Hz): 10.5
Bit rate (bps): 3
Configuration: 5 seconds
Flow range (gpm): 300-600 gpm
Pump Pressure (psi) : 1023
Flow Rate PDXceed (gpm) : 350-550
Total Shocks (k): 0
WOB (klbf): 15.1
RPM : 130
Average ROP (ft/hr): 65
MWD/LWD Tool No : E7312/52159/DN435
Tool MWD /LWD Failure : No
Reason POOH: Section TD
Well: SMU M-03 "Mustang"
COMMENTS RUN 3
The BHA was composed of a 8 ¾” Hycalog PDC SKH519M-B1C bit, 6 ¾” RSS Xceed,
PeriScope 675 LWD, TeleScope MWD, 8 1/2” NM stabilizer, 3 Flex NMDC, saver sub, 9
joints 5” HWDP, hydraulic drilling jars, and 8 joints 5” HWDP.
The BHA performed perfectly directionally. MO was approximately 2 DLS at 40% when
oriented HS and 3.3 at 40% when oriented at 48 right. Xceed would probably produce 10
to 12 DLS at 100% steer force if oriented lowside, 8 to 10 if oriented left or right, and 6
to 8 if oriented highside.
There was 5% to 10% flow blockage on the top of the MWD tool caused by junk of
unknown nature. We will try to remove the junk in the pipeshed. It appears to be metal
shavings but it might be steel, aluminum or plastic. No junk was found in the bit.
The bit was graded 1-1-WT-A-X-I-NO-TD.
Depth Tracking Run 3
The D&M crew installed a drawworks encoder and hookload sensor. The
crew tracked depth following the D&M-SQ-S016 Depth Control Standard v2.0
produced 04-Aug-14 as per attached Pipe Tally sheets.
Well: SMU M-03 "Mustang"
TALLY AND CORRECTIONS RUN 3
Schlumberger D&M Depth Tracking
Well: SMU M-03 "Mustang"
Tally and Corrections
All corrections applied to raw depth are documented as per the pipe tally.
TIME/DEPTH PLOT RUN 3
Time vs. Depth
Well: SMU M-03 "Mustang"
Surface Sensors Calibration
DRAWWORKS ENCODER SENSOR
Well: SMU M-03 "Mustang"
PUMP PRESSURE SENSOR
HOOKLOAD SENSOR
Well: SMU M-03 "Mustang"
10 Survey List
Survey Quality Index
9 : Manual 28 : Tie-In Point
Survey Correction Index
0 : No Correction
Survey Description Index
0 : Not Flagged Survey 5: GMAG-SAG Corrected Survey 13: Inclination Only Survey
MD Incl Azim TVD V Sec N/-S E/-W DLS Run Tool QI CI ID
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (deg
/100ft)
------- ----- ------ ------- ------- -------- ------- ---- --- --------- -- -- --
0 0 55 0 0 0 0 0 - Other 28 0 0
34.7 0 0 34.7 0 0 0 0 1 Other 9 0 0
112.7 0.31 325.4 112.7 -0.16 0.17 -0.12 0.4 1 TeleScope 2 1 13
202.99 0.23 168.99 202.99 -0.18 0.2 -0.22 0.59 1 TeleScope 2 1 13
297.94 0.43 91.88 297.94 -0.01 0 0.17 0.46 1 TeleScope 2 1 13
387.5 2.56 48.54 387.46 -1.48 1.31 2 2.53 1 TeleScope 2 1 13
478.36 4.95 48.66 478.12 -5.79 5.25 6.47 2.63 1 TeleScope 9 0 5
568.21 6.23 47.77 567.54 -12.17 11.08 12.99 1.43 1 TeleScope 9 0 5
661.79 5.99 51.02 660.59 -19.29 17.57 20.54 0.45 1 TeleScope 9 0 5
759.72 6.47 49.47 757.94 -26.78 24.37 28.71 0.52 1 TeleScope 9 0 5
851.86 7.48 50.44 849.4 -34.69 31.56 37.28 1.1 1 TeleScope 9 0 5
948.95 9.12 55.68 945.47 -44 39.92 48.51 1.86 1 TeleScope 9 0 5
1043.63 11.02 61.24 1038.69 -53.78 48.51 62.64 2.25 1 TeleScope 9 0 5
1138.86 12.78 65.07 1131.87 -64.1 57.33 80.17 2.02 1 TeleScope 9 0 5
1236.42 14.07 59.93 1226.77 -76.3 67.82 100.22 1.8 1 TeleScope 9 0 5
1331.64 13.47 61.57 1319.25 -89.06 78.9 119.99 0.75 1 TeleScope 9 0 5
1427.74 14 61.23 1412.6 -101.69 89.82 140.02 0.56 1 TeleScope 9 0 5
Well: SMU M-03 "Mustang"
1523.57 13.48 63.72 1505.69 -113.93 100.35 160.2 0.82 1 TeleScope 9 0 5
1619.05 13.63 68.35 1598.51 -124.75 109.43 180.63 1.15 1 TeleScope 9 0 5
1713.75 14.14 74.76 1690.45 -133.76 116.58 202.17 1.71 1 TeleScope 9 0 5
1810.03 14.84 85.49 1783.69 -139.87 120.64 225.81 2.88 1 TeleScope 9 0 5
1905.68 16.26 96.48 1875.85 -141.54 120.1 251.33 3.41 1 TeleScope 9 0 5
2001.28 17.01 103.25 1967.46 -139.19 115.38 278.24 2.17 1 TeleScope 9 0 13
2097.93 17.18 106.6 2059.84 -134.29 108.06 305.69 1.03 1 TeleScope 9 0 5
2193.97 19.63 116.11 2150.98 -125.63 96.91 333.77 4.03 1 TeleScope 9 0 5
2290.12 21.11 121.21 2241.12 -112.16 80.82 363.09 2.4 1 TeleScope 9 0 5
2386.27 21.99 119 2330.55 -97.19 63.12 393.64 1.25 1 TeleScope 9 0 5
2479.9 21.64 119.06 2417.48 -83.02 46.24 424.07 0.37 1 TeleScope 9 0 5
2508.91 21.56 118.84 2444.45 -78.69 41.07 433.41 0.39 1 TeleScope 9 0 5
2571.44 21.23 118.16 2502.67 -69.59 30.19 453.46 0.66 2 TeleScope 9 0 13
2668.23 21.74 118.06 2592.74 -55.68 13.48 484.73 0.53 2 TeleScope 9 0 5
2762.72 21.75 117.76 2680.5 -42.05 -2.9 515.66 0.12 2 TeleScope 9 0 5
2858.37 21.47 117.49 2769.43 -28.5 -19.24 546.87 0.31 2 TeleScope 9 0 5
2954.94 21.38 118.43 2859.33 -14.74 -35.77 578.03 0.37 2 TeleScope 9 0 5
3050.02 21.77 112.68 2947.75 -2.49 -50.83 609.54 2.26 2 TeleScope 9 0 5
3145.72 21.45 108.69 3036.73 7.04 -63.28 642.49 1.57 2 TeleScope 9 0 5
3241.83 21.58 110.22 3126.15 15.84 -75.02 675.72 0.6 2 TeleScope 9 0 5
3338.14 21.34 112.87 3215.78 25.87 -87.95 708.49 1.04 2 TeleScope 9 0 5
3433.39 21.52 115.39 3304.45 37.27 -102.18 740.24 0.98 2 TeleScope 9 0 5
3529.64 21.56 119.77 3393.98 50.83 -118.53 771.54 1.67 2 TeleScope 9 0 5
3625.11 21.6 118.2 3482.76 65.1 -135.54 802.26 0.61 2 TeleScope 9 0 5
3719.48 21.44 117.35 3570.55 78.51 -151.67 832.89 0.37 2 TeleScope 9 0 5
3815.79 21.3 118.17 3660.24 92.08 -168.02 863.94 0.34 2 TeleScope 9 0 5
3910.78 21.48 117.44 3748.69 105.51 -184.18 894.58 0.34 2 TeleScope 9 0 5
4006.29 21.71 115.54 3837.5 118.38 -199.85 926.04 0.77 2 TeleScope 9 0 5
Well: SMU M-03 "Mustang"
4101.61 21.69 111.51 3926.07 129.57 -213.91 958.34 1.56 2 TeleScope 9 0 5
4197.09 21.57 111.9 4014.82 139.69 -226.93 991.04 0.2 2 TeleScope 9 0 5
4292.92 21.54 115.97 4103.96 151.11 -241.2 1023.2 1.56 2 TeleScope 9 0 5
4389.41 21.49 118.1 4193.72 164.38 -257.28 1054.72 0.81 2 TeleScope 9 0 5
4485.59 21.39 117.42 4283.25 177.98 -273.66 1085.83 0.28 2 TeleScope 9 0 5
4581.76 21.78 122.6 4372.68 192.94 -291.35 1116.43 2.02 2 TeleScope 9 0 5
4676.28 21.92 129.91 4460.43 211.16 -312.12 1144.74 2.88 2 TeleScope 9 0 5
4772.93 22.52 140.2 4549.94 234.63 -337.92 1170.43 4.07 2 TeleScope 9 0 5
4868.57 24.06 145.17 4637.79 262.6 -368 1193.3 2.61 2 TeleScope 9 0 5
4964.92 25.09 148.32 4725.41 294.07 -401.51 1215.24 1.73 2 TeleScope 9 0 5
5061.44 26.21 154.95 4812.44 328.94 -438.25 1235.02 3.19 2 TeleScope 9 0 5
5157.21 27.16 161.97 4898.03 367.37 -478.2 1250.74 3.44 2 TeleScope 9 0 5
5252.52 28.04 171.19 4982.53 409.17 -521.05 1260.91 4.57 2 TeleScope 9 0 5
5347.6 30.06 177.09 5065.66 454.47 -566.93 1265.55 3.68 2 TeleScope 9 0 5
5443.36 32.94 178.13 5147.3 504.08 -616.91 1267.61 3.06 2 TeleScope 9 0 5
5538.94 33.8 180.47 5227.13 556.39 -669.47 1268.24 1.62 2 TeleScope 9 0 5
5635.19 37.05 180.7 5305.55 612.01 -725.25 1267.67 3.38 2 TeleScope 9 0 5
5731.39 40.69 179.49 5380.44 672.14 -785.61 1267.59 3.87 2 TeleScope 9 0 5
5826.58 43.97 180.24 5450.8 735.98 -849.7 1267.73 3.49 2 TeleScope 9 0 5
5921.67 47.51 181.3 5517.15 803.88 -917.78 1266.8 3.81 2 TeleScope 9 0 5
6017.93 51.11 182.6 5579.9 876.75 -990.71 1264.29 3.88 2 TeleScope 9 0 5
6113.52 54.05 181.82 5637.98 952.57
-
1066.57 1261.38 3.14 2 TeleScope 9 0 5
6209.19 57.73 182.4 5691.62 1031.67
-
1145.71 1258.45 3.88 2 TeleScope 9 0 5
6303.31 60.72 183.97 5739.78 1112.48
-
1226.44 1253.94 3.48 2 TeleScope 9 0 5
6400.48 63.35 186.03 5785.35 1198.29
-
1311.92 1246.44 3.29 3 TeleScope 9 0 5
Well: SMU M-03 "Mustang"
6496.44 65.35 188.09 5826.89 1284.73
-
1397.75 1235.8 2.84 3 TeleScope 9 0 5
6592.45 66.99 190.12 5865.68 1372.32
-
1484.46 1221.89 2.58 3 TeleScope 9 0 5
6688.26 67.34 191.71 5902.86 1460.14
-
1571.16 1205.17 1.57 3 TeleScope 9 0 5
6783.39 67.68 191.92 5939.25 1547.42
-
1657.19 1187.18 0.41 3 TeleScope 9 0 5
6879.63 67.71 191.43 5975.78 1635.85
-
1744.39 1169.16 0.47 3 TeleScope 9 0 5
6976.13 67.55 191.02 6012.5 1724.56
-
1831.92 1151.79 0.43 3 TeleScope 9 0 5
7072.2 67.71 190.08 6049.07 1812.99
-
1919.26 1135.52 0.92 3 TeleScope 9 0 5
7167.09 67.52 189.65 6085.21 1900.41 -2005.7 1120.49 0.46 3 TeleScope 9 0 5
7231 67.52 189.65 6109.64 1959.27
-
2063.92 1110.59 0 4 Other 9 0 7
Technical Report Title
Date
Client: Brooks Range Petroleum
Field: Kuparuk River Unit
Rig: Nabors 16E
Date: April 28, 2015
Surface Data Logging
End of Well Report
SMU M-03
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Days vs. Depth
4. After Action Review
5. Mud Record
6. Bit Record
7. Morning Reports
8. Survey Report
Digital Data to include:
Final Log Files
Final End of Well Report
Final LAS Exports
Halliburton Log Viewer
EMF Log Viewer
GENERAL WELL INFORMATION
Company: Brooks Range Petroleum
Rig: Nabors 16E
Well: SMU M-03
Field: Kuparuk River Unit
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-103-20705-00-00
Sperry Job Number: AK-XX-0902266356
Job Start Date: 23 March 2015
Spud Date: 25 March 2015
Total Depth: 7231’ MD, 6110’ TVD
North Reference: True
Declination: 18.686°
Dip Angle: 80.812°
Total Field Strength: 57546.499 nT
Date Of Magnetic Data: 23 March 2015
Wellhead Coordinates N: North 70° 14’ 57.887”
Wellhead Coordinates W: West 150° 16’ 45.133“
Drill Floor Elevation 109.6’
Ground Elevation: 75.1’
Permanent Datum: Mean Sea Level
SDL Engineers: Todd A. Wilson, Hilary Garney, Michael Sherry,
Sonny Tiger
Company Geologist: Tanya Cunningham, Connie Zarndt
Company Representatives: Charley Henley, Adam Johnston, Ronnie Dalton,
Jerry Haberthur
SSDS Unit Number: 118
DAILY SUMMARY
03/23/2015
SDL arrived on location. Wait on the unit to warm up before rigging up. Began rigging up and
ran gas line to the unit along with network connection with MWD and WITS to Canrig.
03/24/2015
SDL unit is rigged up. Prepped the top drive for 5” drill pipe and nippled up the diverter and
stack. The pits were prepped to take on spud mud while the pumps and agitators were function
tested. Then drill pipe and jars were picked up and racked back.
03/25/2015
Made up bottom hole assembly and drilled from 110’ MD to 220’ MD from which the hole was
circulated clean then began to pull out of the hole to 110’ MD to service the top drive and pick
up remaining drilling bottom hole assembly and drilled to 333’ MD. The drawworks
malfunctioned and decision was made to pull out of the hole to 110’ MD, inside the conductor
casing and wait for parts to repair the drawworks.
Gas: The max gas was 8 units and average gas was 3 units.
Fluids: There were no losses down hole.
03/26/2015
Experienced downtime due to drawworks issues; perform rig maintenance and housekeeping.
Brake for circulation at 1900 hours. NOV and EDS technicians arrived and began repairs at
2100 hours.
Gas: There was no gas observed.
Fluids: There were no losses down hole.
03/27/2015
Continued to experience downtime due to drawworks issues with the rig crew assisting the NOV
technician with breaking down the hub, bearing and water jackets and cleaned water jackets
and housing, replace bearing, reassemble brake. Charged both mud pumps and circulated
through the drill string to prepare to run in the hole.
Gas: There was no gas observed.
Fluids: There were no losses down hole.
03/28/2015
Replaced drawworks encoder then proceeded to drill ahead from 333’ MD to 1979’ MD while
increasing the mud weight to 9.4 pounds per gallon by 2000’ MD.
Gas: The max gas was 582 units and average gas was 56 units.
Fluids: There were no losses down hole.
03/29/2015
Drilled ahead 1979’ MD to 2580’ MD at 620 gallons per minute with a 9.6 pounds per gallon
mud weight. Circulated bottoms up and proceeded to back ream out of the hole. Circulated
bottoms up on first 3 stands out of the hole then continued back ream out of the hole from 2280’
MD to flex collars at 282’ MD. Stood back flex collars and laid down bottom hole assembly. The
top drive and mud pumps were blown down and drained the motor.
Gas: The max gas was 518 units and average gas was 74 units.
Fluids: There were no losses down hole.
03/30/2015
Continued to lay down mud motor and all the crossovers down the beaver slide, then rigged up
to run casing. Casing equipment was rigged up and made dummy run with landing joint, laid
down landing joint and hanger. Started running in the hole with 9.625 inch casing from shoe
track to joint 18 and hit bridge at 725’ MD while washing and working through obstructions then
continued running casing to bottom.
Gas: The max gas was 128 units and average gas was 7 units.
Fluids: There were no losses down hole.
03/31/2015
Landed casing then began to circulated and condition mud to 9.6 pounds per gallon and 100
viscosity for cement job. Blew down the top drive and rigged up cement lines. Pressure tested
cement lines to 3000 pounds per square inch. Began to pump cement job but did not bump
plug however float equipment held and 30 barrels of cement returned to surface. Rigged down
casing running tool and blew down cement lines. Cleaned rig floor and equipment. Rigged
down diverter line and prepared to nipple up blow out preventer.
Gas: The max gas was 86 units of trip gas and average gas was 4 units.
Fluids: There were no losses down hole.
04/01/2015
Continued to rig up blow out preventer and proceeded to test. The top drive and drawworks
were serviced. Picked up 18 joints of 5” drill pipe rack back stands.
Gas: There was no gas observed.
Fluids: There were no losses down hole.
04/02/2015
The top drive was serviced while blocks, wash pipe, and top drive were greased. Continued to
pick up bottom hole assembly while the suction lines were cleaned out. Tripped in the hole and
tagged cement at 2400’ MD. Circulated and conditioned mud. Rigged up to test casing and
circulate one bottoms up the pressure tested casing at 3500 pounds per square inch for 30
minutes which tested good. Washed and reamed from 2400’ MD to 2580’ MD then proceeded
to displace old mud with 9.9 pounds per gallon mud while rotating and reciprocating then
continued to rotary drill from 2580’ MD to 2600’ MD.
Gas: The max gas was 58 units and average gas was 4 units.
Fluids: There were no losses down hole.
04/03/2015
Performed leak off test to 13.24 pounds per gallon. Circulated and conditioned mud then
proceeded to drill ahead from 2620’ MD to 3772’ MD.
Gas: The max gas was 105 units and average gas was 51 units.
Fluids: There were no losses down hole.
04/04/2015
Continued to drill ahead from 3772’ MD to 4076’ MD while stopping to circulate and condition
mud to drop ECD from 11.02 pounds per gallon to 10.6 pounds per gallon. Continued drilling
ahead from 4076’ MD to 4450’ MD then proceeded to make a short trip to 2550’ MD. Circulated
and conditioned mud and circulated bottoms up. Serviced top drive and greased crown.
Proceeded to trip back to bottom; washed and reamed from 4356’ MD to 4450’ MD then
continued drilling ahead from 4450’ MD to 4773’ MD.
Gas: The max gas was 3471 units and average gas was 202 units.
Fluids: There were 301 barrels lost down hole.
04/05/2015
Stopped to circulate out max gas of 3471 units and pump pill for losses; continued to drill ahead
from 4773’ MD to 5120’ MD while encountering a hard spot from 4928’ MD to 4968’ MD then
proceeded to drill ahead from 5120’ MD to 5790’ MD.
Gas: The max gas was 1419 units and average gas was 157 units.
Fluids: There were 303 barrels lost down hole.
04/06/2015
Continued to drill ahead from 5790’ MD to 6365’ MD then proceeded to back ream out of the
hole from 6365’ MD to 5503’ MD. Tripped in hole from 5503’ MD to 6365’ MD, circulated
bottoms up 3 times, and started weighting up mud system.
Gas: The max gas was 556 units and average gas was 117 units.
Fluids: There were 110 barrels lost down hole.
04/07/2015
The top drive was serviced then worked pipe 30’ MD from bottom while building mud weight in
pits and mixing a loss circulation pill. Pumped 43 barrels of loss circulation pill from 4100’ MD to
4900’ MD; lost 41.5 barrels in 12 minutes while pumping at 360 gallons per minute. Continued
to weight up while working pipe then proceeded to trip out of hole from 6365’ MD to 3588’ MD;
pumped at 440 gallons per minute every 10 stands and checked for losses. Circulate bottoms
up and condition mud while building a loss circulation pill. Rigged up head pin and tested chart
recorder.
Gas: The max gas was 48 units and average gas was 2 units.
Fluids: There were 250 barrels lost down hole.
04/08/2015
Continued work on loss circulation pill and rigged up test chart recorder. Pumped 80 barrels of
10.5 pound per gallon FAB pill and 80 barrels of 10.5 pound per gallon LCM pill; chased with
130 barrels of 10.5 pound per gallon mud. Pill assumed to be spotted to 4500’ MD with 25
barrels of LCM left in annulus. Held pressure for 3 hours to let pill soak in; brought pumps up
slowly and check for pressure. Circulated bottoms up and stopped to monitor well. Proceeded
to trip out of the hole on elevators from 2565’ MD to surface to lay down bottom hole assembly.
Rigged up to test blow out preventer; tests passed.
Gas: There was no gas observed.
Fluids: There were 200 barrels lost down hole.
04/09/2015
Laid down testing tool and blew down kill line and choke. Picked up and made up bottom hole
assembly, and tripped in the hole to 2635’ MD. Circulated and conditioned mud; tested MWD
tools. Continued tripping in the hole and stopped to circulate at 5315’ MD. Continued tripping in
the hole to 5905’; hit a tight spot at 5905’ MD and started reaming to 6356’ MD then began to
drill ahead from 6365’ MD to 6464’ MD.
Gas: The max gas was 173 units and average gas was 64 units.
Fluids: There were 198 barrels lost down hole.
04/10/2015
Drilled ahead from 6464’ MD to TD of intermediate section at 7231’ MD while experiencing
downhole losses from which the rig circulated and conditioned mud and proceeded to back
ream out of the hole from 7231’ MD to 4680’ MD
Gas: The max gas was 928 units and average gas was 210 units.
Fluids: There were 2248 barrels lost down hole.
04/11/2015
Continued back reaming out of the hole from 4680’ MD to 2635’ MD then circulated 2 bottoms
up at shoe. Then proceeded to trip out of the hole on elevators from 2635’ MD to surface and
laid down bottom hole assembly. The blow out preventers was tested.
Gas: The max gas was 1136 units and average gas was 34 units.
Fluids: There were 50 barrels lost down hole.
04/12/2015
Rigged down blow out preventer testing equipment and rigged up to run 7” casing. Started to
run casing at 15 feet per minute while filling every joint and breaking circulation every 10 joints,
paused to troubleshoot top drive then continued running casing as before.
Gas: There was no gas observed.
Fluids: There were 213 barrels lost down hole.
04/13/2015
Continued running 7” casing at 15 feet per minute from 3137’ MD encountering tight spots
starting at the top of the HRZ.
Gas: The max gas was 16 units of trip gas and average gas was 4 units.
Fluids: There were 141 barrels lost down hole.
04/14/2015
Experienced trouble getting to bottom and started tripping out of hole with 7” casing from 6870’
MD.
Gas: The max gas was 43 units of trip gas and average gas was 6 units.
Fluids: There were no losses down hole.
04/15/2015
Continued to trip out of the hole with 7" casing at 6-10 feet per minute; experienced swabbing.
Filled every third joint then pumped 28 strokes at 3464' MD with no returns and 240 strokes at
2432' MD with 11.3 barrels lost. Continued to trip out of the hole.
Gas: The max gas was 100 units and average gas was 14 units.
Fluids: There were 57 barrels lost down hole.
04/16/2015
Changed out pipe rams, tripped in the hole open ended and circulating at 1500' MD, 2500' MD,
and 4200' MD bottoms up. Pumped pills and squeezed into formation and monitored well.
Gas: The max gas was 1343 units of trip gas and average gas was 44 units.
Fluids: There were 253 barrels lost down hole.
04/17/2015
Pull out of hole and monitor well. Changed rams and test BOP's. Begin making up BHA.
Gas: There was no gas observed.
Fluids: There were 85 barrels gained.
04/18/2015
Ran in the hole to 2500' MD and circulated bottoms up. Ran in to 4100' MD and circulated
bottoms up. Continued in hole to bottom and circulated and conditioned hole.
Gas: The max gas was 2244 units of trip gas and average gas was 114 units.
Fluids: There were 295 barrels lost down hole.
04/19/2015
Washing and reaming to bottom.
Gas: The max gas was 1893 units and average gas was 154 units.
Fluids: There were 1486 barrels lost down hole.
04/20/2015
Wash and rotate down to 6913' MD. Hole began to pack off and lose mud. Pull out of the hole to
6000' MD. Circulate and pump sweeps at 6000’ MD.
Gas: The max gas was 1417 and average gas was 266 units.
Fluids: There were 1885 barrels lost down hole.
04/21/2015
Circulate sweeps and pull out of the hole. Laid down bottom hole assembly. Begin laying down
drill pipe.
Gas: The max gas was 54 and average gas was 8 units.
Fluids: There were 40 barrels gained.
04/22/2015
Changed top set of rams from 4 1/2 X 7" to 3 1/2 X 6 variables and tested. Trip in hole with 5"
drill pipe to 2392' MD and laydown drill pipe.
Gas: The max gas was 9 and average gas was 3 units.
Fluids: There were 40 barrels lost down hole.
04/23/2015
Tripped in the hole to 2565' MD, circulate and condition. Trip in the hole to 5650' MD, circulate
and condition, establish loss rate. Spot pill at 5632' MD. Pull out of hole to 5590' MD. Increase in
return flow. Shut well in at 13:15. 230 barrels gained between 12:00 and 13:00. Well was flowed
back thru choke and gas buster to pits. Circulate and conditioned mud and spotted another high
viscosity pill.
Gas: The max gas was 5038 and average gas was 93 units.
Fluids: There were 460 barrels lost down hole.
04/24/2015
Pumped cement plug. Trip out of hole from 4966' MD to 2571' MD and wait on cement. Ran into
the hole and tagged cement at 4513' MD. Tripped out of the hole to 2765' MD and spotted high
viscosity pill.
Gas: The max gas was 13 and average gas was 4 units.
Fluids: There were 498 barrels lost down hole.
04/25/2015
Pumped 17 pounds per gallon cement plug. Tripped out of the hole from 2762' MD to 1614' MD
then circulated and conditioned mud while waiting on cement. Reamed and washed from 1614'
MD to 3145' MD with no sign of cement plug. Circulated and conditioned the mud while waiting
on more cement to set another plug. Spotted 35 barrels of high viscosity pill then tripped out of
the hole to the shoe and waited on cement truck.
Gas: The max gas was 8 and average gas was 5 units.
Fluids: There were 12 barrels lost down hole.
04/26/2015
Circulate and condition mud at 2548' MD. Trip in the hole from 2543' MD to 2887' MD and
circulate and condition. Rig up head pin and TIW and cement plug. Trip out of hole to 2123' MD
and wait on cement. Run in hole to 2631' MD, circulate and condition mud then run leak off test.
Gas: The max gas was 4 and average gas was 3 units.
Fluids: There were no losses down hole.
0
1000
2000
3000
4000
5000
6000
7000
8000
0 5 10 15 20 25 30 35 40Measured Depth Rig Days
WELL NAME: SMU M-03
OPERATOR: Brooks Range Petroleum
MUD CO: MI Swaco
RIG: Nabors 16E
SPERRY JOB: AK-XX-0902266356
Days vs. Depth
23 March 2015
Sperry SDL Arrived on Location
LOCATION: Kuparuk River Unit
AREA: North Slope Borough
STATE: Alaska
SPUD: 25-Mar-2015
TD: 10-Apr-2015
Commenced 12.25" Surface Hole Section
On Bot: 03:40 25 Mar 2015
TD Surface Hole Section
2580' MD, 2511' TVD
Off Bot: 10:17 29 March 2015
Landed 9.625" Casing
2565' MD, 2510' TVD
31 March 2015
Commenced 8.75" Intermediate Hole Section
On Bot: 19:01 02 Apr 2015
TD Intermediate Hole Section
7231' MD, 6110' TVD
Off Bot: 16:00 10 April 2015
WELL NAME:LOCATION:
OPERATOR:AREA:
SPERRY JOB:STATE:
RIG:HOLE SECTION:
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
Difficulties experienced:
As with surface section comes trying to keep a consistant flow through the gas trap in the possum
belly by scooping out cuttings from underneath and keeping it at a height that will allow for good data.
It was a challenge to keep that up but it was done to the best of our abilities.
Recommendations:
Stay in communication with the pit watcher with regards to the gas trap so we can make sure that it
says clear of cuttings.
Innovations and/or cost savings:
N/A
Nabors 16E Surface
Hilary Garney 30-Mar-2015
What went as, or better than, planned:
There were no major issues with gas gear or equipment. There was good communication between us
and the rig crew regarding pit volumes and gas readings. The power on the rig went out twice but the
UPS was operable and working so that we could still read data.
SMU M-03 Kuparuk River Unit
Brooks Range Petroleum Corp North Slope Borough
AK-XX-0906622356 Alaska
Surface Data Logging
After Action Review
WELL NAME:LOCATION:
OPERATOR:AREA:
SPERRY JOB:STATE:
RIG:HOLE SECTION:
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
Difficulties experienced:
When conducting cleanout and reamer run H2 generator intermitantly lost external pressure and had
to be reset.
Recommendations:
N/A
Innovations and/or cost savings:
N/A
Nabors 16E Intermediate
Sonny Tiger 21-Apr-2015
What went as, or better than, planned:
Gas gear held up for intermediate section, didn’t have to move the gas trap due to fairly constant flow
rate.
SMU M-03 Kuparuk River Unit
Brooks Range Petroleum Corp North Slope Borough
AK-XX-0906622356 Alaska
Surface Data Logging
After Action Review
SMU M-03
Brooks Range Petroleum
MI Swaco
Nabors 16E
AK-XX-0906622356
Date Depth Wt Vis PV YP Gels Filt
R600/R300/R200/R100/
R6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++
24-Mar 0 8.90 208 21 34 21/36/42 11.0 76/55/48/37/20/19 2/-3.0 -/97 -0.25 9.0 25.0 0.25/0.50 3500 280 P/U BHA, 5" DP
25-Mar 332 8.90 238 17 57 39/41/53 11.0 91/74/62/53/37/34 2/-3.0 -/97 0.25 0.28 9.9 25.0 0.20/0.10 800 240 Rig Maintenance
26-Mar 332 8.80 231 16 52 40/47/56 11.5 84/68/61/53/38/38 2/-3.0 -/97 0.50 0.35 9.6 25.0 0.20/0.90 3200 60 Rig Maintenance
27-Mar 332 8.90 210 17 44 30/47/52 11.5 78/61/52/44/30/30 2/-3.0 -/97 0.50 0.30 9.7 25.0 0.10/0.40 1400 20 RIH
28-Mar 1870 9.40 250 20 64 38/57/61 8.0 104/84/73/60/37/36 2/-5.0 -/95 1.00 0.20 9.0 22.5 0.10/0.40 1000 60 Drlling Ahead in Surface Section
29-Mar 2580 9.60 202 23 58 48/70/82 7.6 104/81/73/60/40/40 2/-9.0 -/91 1.50 0.30 10.1 30.0 0.25/0.15 800 60 TD Surface Section
30-Mar 2580 9.60 265 19 54 50/72/86 8.0 92/73/63/56/39/36 2/-9.0 -/91 1.50 0.30 10.0 30.0 0.25/0.15 600 60 Running Surface Casing
31-Mar 2580 9.60 74 22 12 3/3/8 8.8 56/34/25/16/3/3 2/-8.0 -/92 1.50 0.10 8.4 25.0 0.10/0.30 800 60 N/U BOPE
1-Apr 2580 9.60 42 14 6 2/12/35 8.8 34/20/16/11/3/2 2/-8.0 -/92 1.50 0.10 7.9 25.0 0.10/0.30 800 60 P/U DP, BHA
2-Apr 2580 9.50 42 16 12 5/17/33 9.2 44/28/20/16/4/3 1/-12.0 -/88 1.50 1.00 9.2 -0.90/2.90 800 60 FIT Test
3-Apr 3589 9.90 56 12 25 14/21/23 8.8 49/37/32/27/14/12 1/-10.0 -/90 0.25 0.30 10.0 3.8 0.10/0.60 80000 200 Drilling Ahead in Intermediate
4-Apr 4688 9.90 55 11 22 10/22/25 6.7 44/33/26/21/12/10 1/-10.0 -/90 0.40 0.20 9.6 5.0 0.10/0.60 87000 160 Short Trip to Surface Shoe
5-Apr 5657 9.90 55 14 26 9/25/27 6.0 54/40/34/26/11/9 2/-10.5 -/90 0.50 0.20 9.4 7.5 0.10/0.50 50000 240 Drilling Ahead in Intermediate Section
6-Apr 6366 10.30 58 19 28 11/23/31 6.2 66/47/39/29/12/10 1/-10.5 -/90 0.50 0.20 9.6 8.8 0.10/0.70 52000 240 Increasing Mud Weight
7-Apr 6366 10.5 55 17 20 11/18/26 6.8 54/37/30/24/10/9 2/-12 -/88 0.5 0.1 9.5 8.75 0.20/0.60 52000 180 Building LCM Pill
8-Apr 6366 10.4 57 20 26 12/19/29 6.8 66/46/39/33/13/11 2/-12 -/88 0.5 0.2 10.8 6.125 0.20/0.90 51000 240 BOP Test
9-Apr 6366 10.5 53 17 30 10/16/19 5.7 64/47/40/30/11/9 2/-13 -/87 0.75 0.2 9.5 7.5 0.10/1.00 54000 240 Drilling Ahead
10-Apr 7231 10.5 57 20 21 12/20/33 7.5 61/41/35/29/13/11 2/-14 -/86 0.75 0.2 9.7 10 0.30/1.20 41000 320 Backreaming
11-Apr 7231 10.5 50 13 19 8/11/18 5.7 45/32/27/20/8/6 2/-12 -/88 0.75 0.7 9.7 5 0.20/0.70 36000 240 Testing BOP
12-Apr 7231 10.5 49 15 16 9/14/24 5.9 46/31/24/20/10/8 2/-12 -/88 0.75 0.5 9.5 5 0.20/0.80 37500 240 Running Casing
13-Apr 7231 10.5 44 18 10 7/10/14 6.5 46/28/23/18/8/6 2/-12 -/88 0.75 0.1 9.6 5 0.10/0.60 32000 240 Running Casing
14-Apr 7231 10.5 44 12 18 5/7/12 5.0 42/30/25/21/7/6 2/-13 -/87 0.75 0.1 9.6 5 0.20/1.00 32000 200 TOOH w/ Casing
15-Apr 7231 10.5 44 12 16 5/6/7 4.7 40/28/23/12/6/5 2/-12 -/88 0.75 0.4 9.7 5 0.20/0.80 23000 200 Changing Pipe Rams
16-Apr 7231 10.5 51 16 19 7/10/17 4.8 51/35/29/25/9/8 2/-12 -/88 0.75 0.1 9.5 5 0.20/0.80 28000 200 Squeezing plug
17-Apr 7231 10.5 48 16 17 6/8/12 4.8 49/33/28/25/8/7 2/-12 -/88 0.75 0.1 9.5 5 0.20/1.0 26000 200 Make Up BHA
18-Apr 7231 10.5 52 12 19 6/8/11 4.6 43/31/24/19/13/11 2/-11 -/89 0.75 0.1 9.9 5 0.1/0.8 24000 200 R.I.H.
19-Apr 7231 10.5 59 13 23 7/9/12 4.0 49/36/31/26/8/6 2/-11 -/89 0.75 0.1 9.6 5 0.1/0.8 24000 160 Washing to bottom
20-Apr 7231 10.5 54 11 27 10/12/15 4.6 49/38/32/26/10/9 2/-10 -/90 0.75 0.1 9.5 5 0.1/0.8 4800 160 Circulating
21-Apr 7231 10.5 45 12 18 7/8/10 4.8 42/30/25/19/7/6 2/-9 -/91 1 0.1 9.5 2 0.1/0.8 4400 160 Lay down Drill Pipe
22-Apr 7231 10.5 48 12 20 7/8/9 4.8 44/32/26/21/9/8 2/-9 -/91 1 0.1 9.5 2 0.1/0.6 4200 160 Lay down Drill Pipe
23-Apr 7231 10.5 42 13 12 4/6/8 5.5 38/25/20/16/5/4 1/-9 -/91 1 0.1 9.5 2 0.1/0.6 5500 200 POOH
24-Apr 7231 10.5 48 13 12 5/7/9 5.8 38/25/20/16/6/4 1/-9 -/91 1 0.3 10.1 2 0.3/1.1 5800 320 Cementing plug
25-Apr 7231 10.5 42 12 16 5/6/9 5.8 40/28/23/19/6/5 1/-9 -/91 1 0.3 10.9 2 0.3/1.4 5300 160 Circulating
26-Apr 7231 10.5 42 10 18 6/8/9 6.0 38/28/22/18/6/5 1/-9 -/91 1 0.5 10.9 2 0.4/1.6 5300 160 Testing
Casing Record
WELL NAME:LOCATION:Kuparuk River Unit
OPERATOR:AREA:North Slope Borough
MUD CO:STATE:Alaska
RIG:SPUD:25-Mar-2015
SPERRY JOB:TD:10-Apr-2015
Remarks
20" Conductor @ 110' MD, 110'TVD
9.625" Casing @ 2565' MD, 2510'TVD Water and Oil Based Mud Record
BHA#SDL
RUN #Bit #Bit Type Bit
Size Depth In Depth
Out Footage Bit Hours TFA AVG
ROP
WOB
(max)
RPM
(max)
SPP
(max)
FLOW GPM
(max)Bit Grade Comments
1 100 1 Mill Tooth 12.25"110 2580 2470 22.00 0.942 107.2 20 40 1380 630 2-2-WT-A-E-1/16-NO-TD TD Surface
2 200 2 PDC SKH519M-B1C 8.75"2580 6365 3785 58.60 0.773 100.0 13 130 1100 400 1-1-WT-A-X-I-NO-TD Intermediate
4 200 2rr1 PDC SKH519M-B1C 8.75"6365 7231 866 12.40 0.773 69.9 9 130 1000 380 1-1-WT-A-X-I-NO-TD TD Intermediate
5 250 3 DS70FNPX 8.5" PDC 8.75"7231 7231 0 124.00 0.410 0.0 0 140 0 250 1-1-WT-A-X-I-NO -TD Reamer Run
WELL NAME:SMU M-03 LOCATION:Kuparuk River Unit
OPERATOR:Brooks Range Petroleum AREA:North Slope Borough
MUD CO:
SPERRY JOB:AK-XX-0906622356 TD:10-Apr-2015
MI Swaco STATE:Alaska
RIG:Nabors 16E SPUD:25-Mar-2015
Bit Record
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
38
Set AtSize
385.0
Grade
20"
907-754-9459Unit Phone:
0
Hilary Garney
Maximum
Report By:Logging Engineers:Todd Wilson / Hilary Garney
11
0
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0.942
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
25.0238
C-5n
279'
-
C-2
8
in
0 120'Minimum
Depth
Time:
drive. P/U MWD tools and drilled from 220' MD to 333' MD. Drawworks malfunction so POOH to 110' MD inside conductor and
3
0'
333'
333'
Max @ ft Current
217'73.0
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
161.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
C. Henley / R. Dalton
ShClyst TuffGvlCoal
cP
17
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Rig Maintenance
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
9.90
000
SPUD -332'57
Depth in / out
Mud Type
Lst
Type
Average
N/AN/ABackground
(max)
Trip
0.000.00
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
0'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
0
waiting on parts.
110' MD
ConditionBit #
1
3.0
12.25"
8.90
Mill Tooth
8.90
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0.00
Nabors 16E Report For:
Morning Report Report # 1
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
25-Mar-2015
12:00 AM
Current Pump & Flow Data:
0
Max
0
Chlorides
mg/l
800.00
M/U BHA, drilled from 110' MD to 220' MD, circulated hole clean then POOH from 220' MD to 110' MD to service top
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Experienced downtime due to drawworks issues; perform rig maintenance and housekeeping. Brake for circulation
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
3200
0
26-Mar-2015
12:00 AM
Current Pump & Flow Data:
0
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 2
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0.00
Nabors 16E Report For:
ConditionBit #
1
3.0
12.25"
8.80
Mill Tooth
8.80
Size
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
0
Tools
Telemetry, Resistivity, Gamma
API FL
Chromatograph (ppm)
0'
WOB
Conductor
0.000.00
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
0Background (max)Trip
Average
N/A
Mud Type
Lst
Type
SPUD 11.5332'52
Depth in / out
YP
(lb/100ft2)
9.60
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Repairing Draw works
PV
Footage
C. Henley / R. Dalton
ShClyst TuffGvlCoal
cP
16
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
333'
333'
0'
Max @ ft Current
--
Date:
Time:
at 1900 hours. NOV and EDS technicians arrived and began repairs at 2100 hours.
0
in
0 -Minimum
Depth C-5n
-
-
C-2
0
SPP (psi)
Gallons/stroke
TFABit Type
Depth
25.0231
MBT
333'
pH
0.942
0
0
0
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
00
0
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
Set AtSize
385.0
Grade
20"
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize
385.0
Grade
20"
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
0
0
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
333'
pH
0.942
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
25.0210
C-5n
-
-
C-2
0
in
0 -Minimum
Depth
Time:
jackets. Cleaned water jackets and housing, replace bearing, reassemble brake. Charged both mud pumps and circulated through
0
333'
333'
0'
Max @ ft Current
--
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
C. Henley / R. Dalton
ShClyst TuffGvlCoal
cP
17
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Prepare to RIH
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
9.70
000
SPUD 11.5332'44
Depth in / out
Mud Type
Lst
Type
Average
N/A0Background (max)Trip
0.000.00
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
Telemetry, Resistivity, Gamma
API FL
Chromatograph (ppm)
0'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
0
the drillstring. Prepare to run in the hole.
110' MD
ConditionBit #
1
3.0
12.25"
8.90
Mill Tooth
8.90
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0.00
Nabors 16E Report For:
Morning Report Report # 3
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
27-Mar-2015
12:00 AM
Current Pump & Flow Data:
0
Max
0
Chlorides
mg/l
1400
Experienced downtime due to drawworks issues; assist NOV technician with breaking down hub, bearing and water
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Drilled ahead 333’ MD to 372’ MD; slid from 372’ MD to 432’ MD. Drilled ahead from 432’ MD to 481’ MD; slid from
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
1000
0
28-Mar-2015
12:00 AM
Current Pump & Flow Data:
1330
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 4
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0.00
Nabors 16E Report For:
ConditionBit #
1
5.0
12.25"
9.40
Mill Tooth
9.40
Size
831’ MD to 1979’ MD. Increased mud weight to 9.4 by 2000’ MD.
684’ MD; drilled from 684’ MD to 760’ MD. Slid from 760’ MD to 790’ MD; drilled from 790’ MD to 831’ MD. Continued drilling from
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
0
Tools
Telemetry, Resistivity, Gamma
API FL
Chromatograph (ppm)
0'
WOB
Conductor
0.000.00
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
40Background (max)Trip
Average
N/A
Mud Type
Lst
Type
SPUD 8.01870'64
Depth in / out
YP
(lb/100ft2)
9.00
043060
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Drilling Ahead
PV
Footage
C. Henley / R. Dalton
ShClyst TuffGvlCoal
cP
20
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
350.0 Flow In (gpm)
Flow In (spm)
333'
1982'
1649'
Max @ ft Current
1437'70.0
Date:
Time:
481’ MD to 521’ MD. Continued to drill ahead from 521’ MD to 670’ MD. Replaced drawworks encoder. Slid from 670’ MD to
56
in
0 1290'Minimum
Depth C-5n
1708'
180.0
C-2
582
SPP (psi)
Gallons/stroke
TFABit Type
Depth
22.5250
MBT
1982'
pH
0.942
0
0
0
Siltst
575
135
Units*
Casing
Summary
Lithology (%)
04306
0
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
Set AtSize
385.0
Grade
20"
(max)(current)
0
0
Cly
77582
.
.
*
24 hr Recap:
(max)(current)
475
0
Cly
62725
Set AtSize
385.0
Grade
20"
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
9585
19
-
-
Units*
Casing
Summary
Lithology (%)
2
MBT
2580'
pH
0.942
0
24
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
30.0202
C-5n
2300'
-
C-2
518
in
2 2046'Minimum
Depth
Time:
Circulated bottoms up and proceeded to backream out of the hole. Circulated bottoms up on first 3 stands out of the hole.
74
1982'
2580'
598'
Max @ ft Current
2294'46.0
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
248.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
5 0
(current)
C. Henley / R. Dalton
ShClyst TuffGvlCoal
cP
23
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Laying Down BHA
PV
24 hr Max
Weight
43
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
10.10
000
SPUD 7.62580'58
Depth in / out
Mud Type
Lst
Type
Average
N/A40Background (max)Trip
0.000.00
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
Telemetry, Resistivity, Gamma
API FL
Chromatograph (ppm)
0'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
28
assembly. Blew down top drive and mud pumps, drained motor, and broke bit.
Continue backreaming out of the hole from 2280’ MD to flex collars at 282’ MD. Stood back flex collars and lay down bottom hole
110' MD
ConditionBit #
1
9.0
12.25"
9.60
Mill Tooth
9.60
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0.00
Nabors 16E Report For:
Morning Report Report # 5
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
29-Mar-2015
12:00 AM
Current Pump & Flow Data:
-
Max
3
Chlorides
mg/l
800
Drilled ahead 1979’ MD to 2580’ MD at 620 gallons per minute with a 9.6 pounds per gallon mud weight.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Continued to lay down mud motor and all the crossovers down the beaver slide. Rigged up to run casing; picked up
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
600
0
30-Mar-2015
12:00 AM
Current Pump & Flow Data:
-
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 6
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0.00
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
9.0
12.25"
9.60
Mill Tooth
9.60
Size
obstruction. Continue running casing to bottom.
Started running in hole with 9.625 inch casing from shoe track to joint 18 and hit bridge at 725’ MD; washed and worked through
down landing joint and hanger. Picked up shoe track and baker lock connections. Adjusted torque tube to help line up casing.
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
0
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
0.000.00
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
-Background (max)Trip
Average
N/A
Mud Type
Lst
Type
107.0
SPUD 8.02580'54
Depth in / out
YP
(lb/100ft2)
10.00
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
1
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Running Casing
PV
2360'
Footage
22.00
C. Henley / R. Dalton
ShClyst TuffGvlCoal
cP
19
Gas Summary
0
0 0
(current)
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
2580'
2580'
0'
Max @ ft Current
--
Date:
Time:
casing running tools, changed bails, removed and installed cylinder clamps on bails. Made dummy run with landing joint, laid
7
in
0 -Minimum
Depth C-5n
-
-
C-2
128
SPP (psi)
Gallons/stroke
TFABit Type
Depth
30.0265
MBT
-
pH
0.942
0
0
0
Siltst
-
-
Units*
Casing
Summary
Lithology (%)
0538
0
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
Set AtSize
385.0
Grade
20"
(max)(current)
44
0
Cly
17876
.
.
*
24 hr Recap:
(max)(current)
Surface
42
0
Cly
12429
Set AtSize
385.0
Grade
20"
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
572
0
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT
-
pH
0.942
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
25.074
C-5n
-
-
C-2
86
in
0 -Minimum
Depth
Time:
100 viscosity for cement job. Blew down top drive and rigged up cement line. Pressure tested cement lines to 3000 pounds per
4
2580'
2580'
0'
Max @ ft Current
--
Date:
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
C. Henley / R. Dalton
ShClyst TuffGvlCoal
cP
22
2360'
Footage
22.00
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Running Casing
PV
24 hr Max
40.0
Weight
1
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
8.40
000
107.0
SPUD 8.82580'12
Depth in / out
Mud Type
Lst
Type
Average
860Background (max)Trip
0.000.00
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
3
diverter line and prepared to nipple up blow out preventer.
Rigged down casing running tool and rigged down and blew down cement lines. Cleaned rig floor and equipment. Rigged down
square inch. Pumped cement job but did not bump plug; float equipment held and 30 barrels of cement returned to surface.
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
8.0
12.25"
9.60
Mill Tooth
9.60
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0.00
Nabors 16E Report For:
Morning Report Report # 7
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
31-Mar-2015
12:00 AM
Current Pump & Flow Data:
-
Max
0
Chlorides
mg/l
800
Continued running casing and landed at 0200 hours. Circulated and conditioned mud to 9.6 pounds per gallon and
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Continued to rig up blow out preventer and proceeded to test blow out preventer and test casing. Serviced top drive
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
800
0
1-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 8
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0.00
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
8.0
12.25"
9.60
Mill Tooth
9.60
Size
2565' MD
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
0
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
0.000.00
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
0Background (max)Trip
Average
N/A
Mud Type
Lst
Type
107.0
SPUD 8.82580'6
Depth in / out
YP
(lb/100ft2)
7.90
000
00
CementChtSilt
C-4i C-4n
24 hr Max
40.0
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
PU DP
PV
2360'
Footage
22.00
C. Henley / R. Dalton
ShClyst TuffGvlCoal
cP
14
Gas Summary
0
0 0
(current)
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
2580'
2580'
0'
Max @ ft Current
--
Date:
Time:
and drawworks. Picked up 18 joints of 5” drill pipe rack back stands.
0
in
0 -Minimum
Depth C-5n
-
-
C-2
0
SPP (psi)
Gallons/stroke
TFABit Type
Depth
25.042
L-80
MBT
-
pH
0.942
0
0
0
Siltst
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
00
0
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
Set AtSize
385.0
Grade
20"
(max)(current)
Surface
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
Surface
0
0
Cly
0
Set AtSize
385.0
Grade
20"
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
0
0
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT
2600'
pH
0.942
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
20.042
C-5n
2591'
-
C-2
58
in
0 -Minimum
Depth
Time:
suction lines which were clogged with sand. Tripped in the hole and tagged cement at 2400’ MD. Circulated and conditioned
4
*Chromograph did not initialize for the 20' interval of new footage.
2580'
2599'
19'
Max @ ft Current
2593'35.0
Date:
Avg
to2580'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
126.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
C. Henley / J. Haberthur
ShClyst TuffGvlCoal
cP
16
2360'
8.75 0.773
Footage
22.00
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Leak Off Test
PV
24 hr Max
40.0
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
9.20
000
107.0
Hycalog PDC
SPUD 9.22580'12
Depth in / out
Mud Type
Lst
Type
Average
N/A0Background (max)Trip
0.000.00
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
Rotary steerable, Gamma, Resistivity, Telemetry, PWD
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
0
2
rotating and reciprocating. Rotary drilled from 2580’ MD to 2600’ MD.
minutes; tested good. Washed and reamed from 2400’ MD to 2580’ MD. Displaced old mud with 9.9 pounds per gallon mud while
mud. Rigged up to test casing and circulate one bottoms up. Pressure tested casing at 3500 pounds per square inch for 30
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
12.0
12.25"
9.50
Mill Tooth
9.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0.00
Nabors 16E Report For:
Morning Report Report # 9
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
2-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
0
Chlorides
mg/l
800
Serviced top drive, greased blocks, washpipe, and top drive. Continued to pick up bottom hole assembly. Cleaned
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Performed leak off test to 13.24 pounds per gallon. Circulated and conditioned mud. Rotary drilled from 2620’ MD
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
80000
0
3-Apr-2015
12:00 AM
Current Pump & Flow Data:
1077
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 10
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
10.0
12.25"
9.90
Mill Tooth
9.90
Size
2
Continued drilling ahead to 3772’ MD.
2565' MD
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
0
Tools
Rotary steerable, Gamma, Resistivity, Telemetry, PWD
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
--
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
53Background (max)Trip
Average
N/A
Mud Type
Lst
Type
107.0
Hycalog PDC
FLOPRO 8.82580'25
Depth in / out
YP
(lb/100ft2)
10.00
000
00
CementChtSilt
C-4i C-4n
24 hr Max
40.0
Weight
37
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Drilling Ahead
PV
2360'
8.75 0.773
Footage
22.00
C. Henley / J. Haberthur
ShClyst TuffGvlCoal
cP
12
Gas Summary
0
0 0
(current)
Avg
to2580'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
208.0 Flow In (gpm)
Flow In (spm)
2599'
3772'
1173'
Max @ ft Current
3224'85.0
Date:
Time:
to 2727’ MD at 500 gallons per minute, 1250 pounds per square inch, 5-10K weight on bit, and 120 revolutions per minute.
51
in
0 -Minimum
Depth C-5n
2591'
136.0
C-2
105
SPP (psi)
Gallons/stroke
TFABit Type
Depth
3.856
L-80
MBT
3772'
pH
0.942
0
0
0
Siltst
9 5/8"
440
105
Units*
Casing
Summary
Lithology (%)
08100
0
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
Set AtSize
385.0
Grade
20"
(max)(current)
Surface
55
0
Cly
14939
.
.
*
24 hr Recap:
(max)(current)
Surface
21389
0
Cly
193230
Set AtSize
385.0
Grade
20"
907-754-9459Unit Phone:
1443
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
18127
0
9 5/8"
419
100
Units*
Casing
Summary
Lithology (%)
66
L-80
MBT
4806'
pH
0.942
0
1847
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
5.055
C-5n
4781'
110.0
C-2
3471
in
1 -Minimum
Depth
Time:
Mud Loss/Gain: 301 bbls lost downhole
inch, 5-10K weight on bit, and 140 revolutions per minute. Stopped to circulate and condition mud to drop ECD from 11.02 pounds
202
to 4773’ MD.
3772'
4806'
1034'
Max @ ft Current
3972'85.0
Date:
Avg
to2580'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
203.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
4348 1793
(current)
C. Henley / J. Haberthur
ShClyst TuffGvlCoal
cP
11
2360'
8.75 0.773
Footage
22.00
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Drilling Ahead
PV
24 hr Max
40.0
Weight
1110
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
9.60
4314653
107.0
Hycalog PDC
FLOPRO 6.74688'22
Depth in / out
Mud Type
Lst
Type
Average
N/A80Background (max)Trip
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
Rotary steerable, Gamma, Resistivity, Telemetry, PWD
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
12394
2
Proceeded to trip back to bottom; washed and reamed from 4356’ MD to 4450’ MD. Continued rotary drilling ahead from 4450’ MD
made a short trip to 2550’ MD. Circulated and conditioned mud and circulated bottoms up. Serviced top drive and greased crown.
per gallon to 10.6 pounds per gallon. Continued drilling ahead from 4076’ MD to 4450’ MD. Circulated and conditioned mud, and
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
10.0
12.25"
9.90
Mill Tooth
9.90
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Morning Report Report # 11
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
4-Apr-2015
12:00 AM
Current Pump & Flow Data:
1096
Max
505
Chlorides
mg/l
87000
Continued rotary drilling ahead from 3772’ MD to 4076’ MD at 450 gallons per minute, 1200 pounds per square
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Stopped to circulate out max gas of 3471 units and pump pill for losses. Continued to drill ahead from 4773’ MD to
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
50000
594
5-Apr-2015
12:00 AM
Current Pump & Flow Data:
1165
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 12
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
10.5
12.25"
9.90
Mill Tooth
9.90
Size
2
mud weight; hit hard spot from 4928’ MD to 4968’ MD. Proceeded to drill ahead from 5120’ MD to 5790’ MD.
2565' MD
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
1625
Tools
Rotary steerable, Gamma, Resistivity, Telemetry, PWD
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
--
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
130Background (max)Trip
Average
N/A
Mud Type
Lst
Type
107.0
Hycalog PDC
FLOPRO 6.05657'26
Depth in / out
YP
(lb/100ft2)
9.40
5320263
00
CementChtSilt
C-4i C-4n
24 hr Max
40.0
Weight
1068
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Drilling Ahead
PV
2360'
8.75 0.773
Footage
22.00
C. Henley / J. Haberthur
ShClyst TuffGvlCoal
cP
14
Gas Summary
0
575 306
(current)
Avg
to2580'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
274.0 Flow In (gpm)
Flow In (spm)
4806'
5821'
1015'
Max @ ft Current
5226'44.0
Date:
Time:
Mud Loss/Gain: 303 bbls lost downhole
5120’ MD at 173K revolutions per minute, 450 gallons per minute, and 1040 pounds per square inch, with 9.9 pounds per gallon
157
in
2 5094'Minimum
Depth C-5n
4806'
45.0
C-2
1419
SPP (psi)
Gallons/stroke
TFABit Type
Depth
7.555
L-80
MBT
5821'
pH
0.942
10
244
0
Siltst
9 5/8"
440
105
Units*
Casing
Summary
Lithology (%)
7914990
385
907-754-9459Unit Phone:
189
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
Set AtSize
385.0
Grade
20"
(max)(current)
Surface
2902
21
Cly
25841
.
.
*
24 hr Recap:
(max)(current)
Surface
2290
110
Cly
46464
Set AtSize
385.0
Grade
20"
907-754-9459Unit Phone:
39
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
13558
1261
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
32
L-80
MBT
6365'
pH
0.942
52
72
8
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
8.858
C-5n
5886'
-
C-2
556
in
1 6063'Minimum
Depth
Time:
Mud Loss/Gain: 110 bbls lost downhole
minute, 450 gallons per minute, 1210 pounds per square inch, and 5-10K weight on bit. Proceeded to backream out of the hole
117
5821'
6365'
544'
Max @ ft Current
6187'24.0
Date:
Avg
to2580'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
114.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
172 45
(current)
C. Henley / J. Haberthur
ShClyst TuffGvlCoal
cP
19
2360'
8.75 0.773
Footage
22.00
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Increasing Mud Weight
PV
24 hr Max
40.0
Weight
878
Hours
C-3
624
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
9.60
179122
107.0
Hycalog PDC
FLOPRO 6.26365'28
Depth in / out
Mud Type
Lst
Type
Average
N/A2Background (max)Trip
--
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
Rotary steerable, Gamma, Resistivity, Telemetry, PWD
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
726
2
mud system.
from 6365’ MD to 5503’ MD. Tripped in hole from 5503’ MD to 6365’ MD, circulated bottoms up 3 times, and started weighting up
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
10.5
12.25"
10.30
Mill Tooth
10.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Morning Report Report # 13
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
6-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
318
Chlorides
mg/l
52000
Continued to drill ahead from 5790’ MD to 6365’ MD with a 9.9 pound per gallon mud weight at 140 revolutions per
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Serviced the top drive. Worked pipe 30’ MD from bottom while building mud weight in pits and mixing a loss
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
52000
0
7-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 14
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
12.0
12.25"
10.50
Mill Tooth
10.50
Size
2
while building a loss circulation pill. Rigged up head pin and tested chart recorder.
3588’ MD; pumped at 440 gallons per minute every 10 stands and checked for losses. Circulate bottoms up and condition mud
pumping at 360 gallons per minute. Continued to weight up while working pipe. Proceeded to trip out of hole from 6365’ MD to
2565' MD
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
64
Tools
Rotary steerable, Gamma, Resistivity, Telemetry, PWD
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
--
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
0Background (max)Trip
Average
N/A
Mud Type
Lst
Type
107.0
Hycalog PDC
FLOPRO 6.86365'20
Depth in / out
YP
(lb/100ft2)
9.50
000
00
CementChtSilt
C-4i C-4n
24 hr Max
40.0
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Building LCM Pill
PV
2360'
8.75 0.773
Footage
22.00
C. Henley / J. Haberthur
ShClyst TuffGvlCoal
cP
17
Gas Summary
0
22 3
(current)
Avg
to2580'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
6365'
6365'
0'
Max @ ft Current
--
Date:
Time:
Mud Loss/Gain: 250 bbls lost downhole
circulation pill. Pumped 43 barrels of loss circulation pill from 4100’ MD to 4900’ MD; lost 41.5 barrels in 12 minutes while
2
in
0 -Minimum
Depth C-5n
-
-
C-2
48
SPP (psi)
Gallons/stroke
TFABit Type
Depth
8.855
L-80
MBT
6365'
pH
0.942
0
9
0
Siltst
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
016
0
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
Set AtSize
385.0
Grade
20"
(max)(current)
Surface
161
0
Cly
5396
.
.
*
24 hr Recap:
(max)(current)
Surface
0
0
Cly
0
Set AtSize
385.0
Grade
20"
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
0
0
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT
6365'
pH
0.942
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
6.157
C-5n
-
-
C-2
0
in
0 -Minimum
Depth
Time:
Mud Loss/Gain: 200 bbls lost downhole
FAB pill and 80 barrels of 10.5 pound per gallon LCM pill; chased with 130 barrels of 10.5 pound per gallon mud. Pill assumed to
0
6365'
6365'
0'
Max @ ft Current
--
Date:
Avg
to2580'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
C. Henley / J. Haberthur
ShClyst TuffGvlCoal
cP
20
2360'
8.75 0.773
Footage
22.00
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Testing BOP
PV
24 hr Max
40.0
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
10.80
000
107.0
Hycalog PDC
FLOPRO 6.86365'26
Depth in / out
Mud Type
Lst
Type
Average
N/A0Background (max)Trip
--
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
Rotary steerable, Gamma, Resistivity, Telemetry, PWD
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
0
2
from 2565’ MD to surface. Lay down bottom hole assembly. Rigged up to test blow out preventer; tests passed.
slowly and check for pressure. Circulated bottoms up and stopped to monitor well. Proceeded to trip out of the hole on elevators
be spotted to 4500’ MD with 25 barrels of LCM left in annulus. Held pressure for 3 hours to let pill soak in; brought pumps up
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
12.0
12.25"
10.40
Mill Tooth
10.40
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Morning Report Report # 15
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
8-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
0
Chlorides
mg/l
51000
Continued work on loss circulation pill. Rigged up test chart recorder. Pumped 80 barrels of 10.5 pound per gallon
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Laid down testing tool and blew down kill line and choke. Picked up and made up bottom hole assembly, and
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
54000
237
9-Apr-2015
12:00 AM
Current Pump & Flow Data:
1082
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 16
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
13.0
12.25"
10.50
Mill Tooth
10.50
Size
2
Proceeded to rotary drill ahead from 6365’ MD to 6464’ MD.
circulate at 5315’ MD. Continued tripping in the hole to 5905’; hit a tight spot at 5905’ MD and started reaming to 6356’ MD.
2565' MD
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
434
Tools
Rotary steerable, Gamma, Resistivity, Telemetry, PWD
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
--
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
0Background (max)Trip
Average
139
Mud Type
Lst
Type
107.0
Hycalog PDC
FLOPRO 5.76365'30
Depth in / out
YP
(lb/100ft2)
9.50
46812
00
CementChtSilt
C-4i C-4n
24 hr Max
40.0
Weight
558
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Drilling ahead
PV
2360'
8.75 0.773
Footage
22.00
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
17
Gas Summary
0
120 25
(current)
Avg
to2580'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
122.0 Flow In (gpm)
Flow In (spm)
6365'
6452'
87'
Max @ ft Current
6389'55.0
Date:
Time:
Mud Loss/Gain: 198 bbls lost downhole
tripped in the hole to 2635’ MD. Circulated and conditioned mud; tested MWD tools. Continued tripping in the hole and stopped to
64
in
0 -Minimum
Depth C-5n
6405'
78.0
C-2
173
SPP (psi)
Gallons/stroke
TFABit Type
Depth
7.553
L-80
MBT
6452'
pH
0.942
0
45
0
Siltst
9 5/8"
398
95
Units*
Casing
Summary
Lithology (%)
258735
0
907-754-9459Unit Phone:
16
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
Set AtSize
385.0
Grade
20"
(max)(current)
Surface
1072
0
Cly
17719
.
.
*
24 hr Recap:
(max)(current)
Surface
6308
0
Cly
89777
Set AtSize
385.0
Grade
20"
907-754-9459Unit Phone:
86
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
23984
0
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
69
L-80
MBT
7231'
pH
0.942
0
222
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
10.057
C-5n
6560'
-
C-2
928
in
0 -Minimum
Depth
Time:
Mud Loss/Gain: 2248 bbls lost downhole
losses. Circulated and conditioned mud and proceeded to backream out of the hole from 7231’ MD to 4680’ MD.
210
6452'
7231'
779'
Max @ ft Current
6482'40.0
Date:
Avg
to2580'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
121.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
653 112
(current)
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
20
2360'
8.75 0.773
Footage
22.00
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Backreaming
PV
24 hr Max
40.0
Weight
1783
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
9.70
2117732
107.0
Hycalog PDC
FLOPRO 7.57231'21
Depth in / out
Mud Type
Lst
Type
Average
N/A0Background (max)Trip
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
Rotary steerable, Gamma, Resistivity, Telemetry, PWD
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
2680
2
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
14.0
12.25"
10.50
Mill Tooth
10.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Morning Report Report # 17
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
10-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
699
Chlorides
mg/l
41000
Continued to drill ahead from 6464’ MD to TD of intermediate section at 7231’ MD while experiencing downhole
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Continued backreaming out of the hole from 4680’ MD to 2635’ MD. Circulated 2 bottoms up at shoe. Proceeded
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
41000
-
11-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
1-1-WT-A-X-I-NO-TD
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 18
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
14.0
12.25"
10.50
Mill Tooth
10.50
Size
2
2565' MD
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
-
Tools
Rotary steerable, Gamma, Resistivity, Telemetry, PWD
API FL
Chromatograph (ppm)
9
20.0220' 2580'
WOB
Conductor
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
0Background (max)Trip
Average
1136
Mud Type
Lst
Type
130
107.0
Hycalog PDC
FLOPRO 7.5
2580'
7231'21
7231'
Depth in / out
YP
(lb/100ft2)
9.70
---
--
CementChtSilt
C-4i C-4n
24 hr Max
40.0
Weight
-
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Testing BOP
PV
2360'
8.75 0.773
Footage
58.60 4651'
22.00
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
20
Gas Summary
-
--
(current)
Avg
to2580'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
7231'
7231'
0'
Max @ ft Current
--
Date:
Time:
Mud Loss/Gain: -50 bbls lost downhole
to trip out of the hole on elevators from 2635’ MD to surface. Laid down bottom hole assembly. Tested blow out preventer.
34
in
0 -Minimum
Depth C-5n
-
-
C-2
1136
SPP (psi)
Gallons/stroke
TFABit Type
Depth
10.057
L-80
MBT
7231'
pH
0.942
-
-
-
Siltst
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
--
-
907-754-9459Unit Phone:
-
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
Set AtSize
385.0
Grade
20"
(max)(current)
Surface
-
-
Cly
-
.
.
*
24 hr Recap:
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
(max)(current)
Surface
-
-
Cly
-
Set AtSize
385.0
Grade
20"
7"
907-754-9459Unit Phone:
-
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
-
-
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
-
L-80
MBT
-
pH
0.942
-
-
-
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
5.049
C-5n
-
-
C-2
-
in
--Minimum
Depth
Time:
Mud Loss/Gain: -213 bbls lost downhole
per minute; filling every joint and breaking circulation every 10 joints. Paused to troubleshoot topdrive. Continued running casing
-
7231'
7231'
0'
Max @ ft Current
--
Date:
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
-
--
(current)
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
15
2360'
Footage
22.00
7231' 4651'
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Running Casing
PV
24 hr Max
40.0
Weight
-
Hours
C-3
--
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
9.50
---
107.0
FLOPRO 5.97231'16
Depth in / out
Mud Type
Lst
Type
Average
N/A0Background (max)
Trip
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
-
as before.
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
12.0
12.25"
10.50
Mill Tooth
10.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Morning Report Report # 19
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
12-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
-
Chlorides
mg/l
37500
Rigged down blow out preventer testing equipment and rigged up to run 7” casing. Started to run casing at 15 feet
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Continued running 7” casing at 15 feet per minute from 3137’ MD; hit tight spots starting at the top of the HRZ.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
32000
11
13-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 20
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
12.0
12.25"
10.50
Mill Tooth
10.50
Size
2565' MD
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
47
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
0Background (max)
Trip
Average
16
Mud Type
Lst
Type
107.0
FLOPRO 6.57231'10
Depth in / out
YP
(lb/100ft2)
9.60
050
--
CementChtSilt
C-4i C-4n
24 hr Max
40.0
Weight
13
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Running Casing
PV
2360'
Footage
22.00
7231' 4651'
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
18
Gas Summary
-
20 0
(current)
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
7231'
7231'
0'
Max @ ft Current
--
Date:
Time:
Mud Loss/Gain: -141 bbls lost downhole
4
in
--Minimum
Depth C-5n
-
-
C-2
16
SPP (psi)
Gallons/stroke
TFABit Type
Depth
5.044
L-80
MBT
-
pH
0.942
-
7
-
Siltst
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
0190
-
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
Set AtSize
385.0
Grade
20"
7"
(max)(current)
Surface
82
-
Cly
1516
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
.
.
*
24 hr Recap:
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
(max)(current)
Surface
224
-
Cly
4955
Set AtSize
385.0
Grade
20"
7"
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Hilary Garney
1516
-
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
7
L-80
MBT
-
pH
0.942
-
10
-
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
5.044
C-5n
-
-
C-2
43
in
0 -Minimum
Depth
Time:
Mud Loss/Gain: 0 bbls lost downhole
6
7231'
7231'
0'
Max @ ft Current
--
Date:
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
-
28 0
(current)
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
12
2360'
Footage
22.00
7231' 4651'
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
TOOH w/ Casing
PV
24 hr Max
40.0
Weight
82
Hours
C-3
--
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
9.60
0200
107.0
FLOPRO 5.07231'18
Depth in / out
Mud Type
Lst
Type
Average
160Background (max)
Trip
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
88
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
13.0
12.25"
10.50
Mill Tooth
10.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Morning Report Report # 21
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
14-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
47
Chlorides
mg/l
32000
Experienced trouble getting to bottom; started tripping out of hole with 7” casing from 6870’ MD.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Continued to trip out of the hole with 7" casing at 6-10 feet per minute while swabbing. Filled every third joint.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
23000
0
15-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 22
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
12.0
12.25"
10.50
Mill Tooth
10.50
Size
hole.
2565' MD
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
0
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
0Background (max)
Trip
Average
100
Mud Type
Lst
Type
107.0
FLOPRO 4.77231'16
Depth in / out
YP
(lb/100ft2)
9.70
000
--
CementChtSilt
C-4i C-4n
24 hr Max
40.0
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Changing Pipe Rams
PV
2360'
Footage
22.00
7231' 4651'
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
12
Gas Summary
-
0 0
(current)
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
7231'
7231'
0'
Max @ ft Current
--
Date:
Time:
Mud Loss/Gain: 57 bbls lost downhole
Pumped 28 strokes at 3464' MD with no returns and 240 strokes at 2432' MD with 11.3 barrels lost. Continued to trip out of the
12
in
0 -Minimum
Depth C-5n
-
-
C-2
100
SPP (psi)
Gallons/stroke
TFABit Type
Depth
5.044
L-80
MBT
-
pH
0.942
-
0
-
Siltst
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
00
-
907-754-9459Unit Phone:
0
Michael Sherry
Maximum
Report By:Logging Engineers:Michael Sherry / Sonny Tiger
Set AtSize
385.0
Grade
20"
7"
(max)(current)
Surface
0
-
Cly
0
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
.
.
*
24 hr Recap:
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
(max)(current)
Surface
0
-
Cly
0
Set AtSize
385.0
Grade
20"
7"
907-754-9459Unit Phone:
0
Todd A. Wilson
Maximum
Report By:Logging Engineers:Todd A. Wilson / Sonny Tiger
0
-
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT
-
pH
0.942
-
0
-
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
5.044
C-5n
-
-
C-2
1343
in
0 -Minimum
Depth
Time:
Mud Loss/Gain: 253 bbls lost downhole
Pumped pills and squeezed into formation and monitored well.
44
7231'
7231'
0'
Max @ ft Current
--
Date:
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
-
0 0
(current)
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
12
2360'
Footage
22.00
7231' 4651'
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Squeezing plug
PV
24 hr Max
40.0
Weight
0
Hours
C-3
--
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
9.70
000
107.0
FLOPRO 4.77231'16
Depth in / out
Mud Type
Lst
Type
Average
13430Background
(max)
Trip
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
0
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
12.0
12.25"
10.50
Mill Tooth
10.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Morning Report Report # 23
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
16-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
0
Chlorides
mg/l
23000
Changed out pipe rams, tripped in the hole open ended and circulating at 1500', 2500', and 4200' bottoms up.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Pull out of hole and monitor well. Change rams and test BOP's. Begin making up BHA.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
26000
0
17-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 24
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
12.0
12.25"
10.50
Mill Tooth
10.50
Size
2565' MD
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
0
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
0Background
(max)
Trip
Average
N/A
Mud Type
Lst
Type
107.0
FLOPRO 4.87231'17
Depth in / out
YP
(lb/100ft2)
9.50
000
--
CementCht Silt
C-4i C-4n
24 hr Max
40.0
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Make Up BHA
PV
2360'
Footage
22.00
7231' 4651'
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
16
Gas Summary
-
0 0
(current)
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
7231'
7231'
0'
Max @ ft Current
--
Date:
Time:
Mud Loss/Gain: 85 bbls gained
0
in
0 -Minimum
Depth C-5n
-
-
C-2
0
SPP (psi)
Gallons/stroke
TFABit Type
Depth
5.048
L-80
MBT
-
pH
0.942
-
0
-
Siltst
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
00
-
907-754-9459Unit Phone:
0
Todd A. Wilson
Maximum
Report By:Logging Engineers:Todd A. Wilson / Sonny Tiger
Set AtSize
385.0
Grade
20"
7"
(max)(current)
Surface
0
-
Cly
0
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
.
.
*
24 hr Recap:
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
(max)(current)
Surface
0
-
Cly
0
Set AtSize
385.0
Grade
20"
7"
907-754-9459Unit Phone:
0
Todd A. Wilson
Maximum
Report By:Logging Engineers:Todd A. Wilson / Sonny Tiger
0
-
9 5/8"
147
35
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT
-
pH
0.942
-
0
-
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
5.052
C-5n
-
-
C-2
2244
in
0 -Minimum
Depth
Time:
Mud Loss/Gain: 295 bbls lost down hole
Continued in hole to bottom and circulated and conditioned hole.
114
7231'
7231'
0'
Max @ ft Current
--
Date:
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
-
0 0
(current)
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
12
2360'
Footage
22.00
7231' 4651'
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
R.I.H.
PV
24 hr Max
40.0
Weight
0
Hours
C-3
--
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
9.90
000
107.0
FLOPRO 4.67231'19
Depth in / out
Mud Type
Lst
Type
Average
224476Background
(max)
Trip
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
0
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
11.0
12.25"
10.50
Mill Tooth
10.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Morning Report Report # 25
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
18-Apr-2015
12:00 AM
Current Pump & Flow Data:
300
Max
0
Chlorides
mg/l
24000
Ran in the hole to 2500' MD and circulated bottoms up. Ran in to 4100' MD and circulated bottoms up.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
(max)(current)
Surface
0
-
Cly
0
Set AtSize
385.0
Grade
20"
7"
907-754-9459Unit Phone:
0
Todd A. Wilson
Maximum
Report By:Logging Engineers:Todd A. Wilson / Sonny Tiger
0
-
9 5/8"
38
9
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT
-
pH
0.942
-
0
-
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
5.059
C-5n
-
-
C-2
1893
in
0 -Minimum
Depth
Time:
Mud Loss/Gain: 1486 bbls lost down hole
154
7231'
7231'
0'
Max @ ft Current
--
Date:
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
-
0 0
(current)
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
13
2360'
Footage
22.00
7231' 4651'
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Washing to bottom
PV
24 hr Max
40.0
Weight
0
Hours
C-3
--
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
9.60
000
107.0
FLOPRO 4.07231'23
Depth in / out
Mud Type
Lst
Type
Average
1893245Background
(max)
Trip
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
0
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
11.0
12.25"
10.50
Mill Tooth
10.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Morning Report Report # 26
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
19-Apr-2015
12:00 AM
Current Pump & Flow Data:
150
Max
0
Chlorides
mg/l
24000
Washing and reaming to bottom.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Wash and rotate down to 6913' MD. Hole began to pack off and lose mud. Pull out of the hole to 6000' MD.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
4800
0
20-Apr-2015
12:00 AM
Current Pump & Flow Data:
660
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 27
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
10.0
12.25"
10.50
Mill Tooth
10.50
Size
2565' MD
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
0
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
25Background
(max)
Trip
Average
N/A
Mud Type
Lst
Type
107.0
FLOPRO 4.67231'27
Depth in / out
YP
(lb/100ft2)
9.50
000
--
CementCht Silt
C-4i C-4n
24 hr Max
40.0
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Circulating
PV
2360'
Footage
22.00
7231' 4651'
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
11
Gas Summary
-
0 0
(current)
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
7231'
7231'
0'
Max @ ft Current
--
Date:
Time:
Mud Loss/Gain: 1885 bbls lost down hole
Circulate and pump sweeps at 6000’ MD.
266
in
0 -Minimum
Depth C-5n
-
-
C-2
1417
SPP (psi)
Gallons/stroke
TFABit Type
Depth
5.054
L-80
MBT
-
pH
0.942
-
0
-
Siltst
9 5/8"
253
60
Units*
Casing
Summary
Lithology (%)
00
-
907-754-9459Unit Phone:
0
Todd A. Wilson
Maximum
Report By:Logging Engineers:Todd A. Wilson / Sonny Tiger
Set AtSize
385.0
Grade
20"
7"
(max)(current)
Surface
0
-
Cly
0
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
.
.
*
24 hr Recap:
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
(max)(current)
Surface
0
-
Cly
0
Set AtSize
385.0
Grade
20"
7"
907-754-9459Unit Phone:
0
Todd A. Wilson
Maximum
Report By:Logging Engineers:Todd A. Wilson / Sonny Tiger
0
-
9 5/8"
253
60
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT
-
pH
0.942
-
0
-
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
5.054
C-5n
-
-
C-2
54
in
0 -Minimum
Depth
Time:
Mud Loss/Gain: 40 bbls gained
8
7231'
7231'
0'
Max @ ft Current
--
Date:
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
-
0 0
(current)
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
11
2360'
Footage
22.00
7231' 4651'
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Lay down DP
PV
24 hr Max
40.0
Weight
0
Hours
C-3
--
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
9.50
000
107.0
FLOPRO 4.67231'27
Depth in / out
Mud Type
Lst
Type
Average
N/A3Background
(max)
Trip
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
0
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
10.0
12.25"
10.50
Mill Tooth
10.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Morning Report Report # 28
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
21-Apr-2015
12:00 AM
Current Pump & Flow Data:
660
Max
0
Chlorides
mg/l
4800
Circulate sweeps and pull out of the hole. Laid down BHA . Begin laying down drill pipe.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: Changed top set of rams from 4 1/2 X 7" to 3 1/2 X 6 variables and tested. Tripped in hole with 5" drill pipe
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
4200
0
22-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 29
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
9.0
12.25"
10.50
Mill Tooth
10.50
Size
2565' MD
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
0
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
N/ABackground
(max)
Trip
Average
N/A
Mud Type
Lst
Type
107.0
FLOPRO 4.87231'20
Depth in / out
YP
(lb/100ft2)
9.50
000
--
CementCht Silt
C-4i C-4n
24 hr Max
40.0
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Lay down DP
PV
2360'
Footage
22.00
7231' 4651'
A. Johnston / J. Haberthur
ShClyst TuffGvlCoal
cP
12
Gas Summary
-
0 0
(current)
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
7231'
7231'
0'
Max @ ft Current
--
Date:
Time:
Mud Loss/Gain: 40 bbls lost down hole.
to 2392' MD and laydown drill pipe.
3
in
0 -Minimum
Depth C-5n
-
-
C-2
9
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2.048
L-80
MBT
-
pH
0.942
-
0
-
Siltst
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
00
-
907-754-9459Unit Phone:
0
Todd A. Wilson
Maximum
Report By:Logging Engineers:Todd A. Wilson / Sonny Tiger
Set AtSize
385.0
Grade
20"
7"
(max)(current)
Surface
0
-
Cly
0
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
.
.
*
24 hr Recap:
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
(max)(current)
Surface
0
-
Cly
0
Set AtSize
385.0
Grade
20"
7"
907-754-9459Unit Phone:
0
Todd A. Wilson
Maximum
Report By:Logging Engineers:Todd A. Wilson / Hilary Garney
0
-
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT
-
pH
0.942
-
0
-
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2.042
C-5n
-
-
C-2
5038
in
0 -Minimum
Depth
Time:
Mud Loss/Gain: 460 bbls lost down hole.
loss rate. Spot pill at 5632' MD. Pull out of hole to 5590' MD. Increase in return flow. Shut well in at 13:15. 230 bbls gained between
93
7231'
7231'
0'
Max @ ft Current
--
Date:
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
-
0 0
(current)
C. Henley / R. Dalton
ShClyst TuffGvlCoal
cP
13
2360'
Footage
22.00
7231' 4651'
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
POOH
PV
24 hr Max
40.0
Weight
0
Hours
C-3
--
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
9.50
000
107.0
FLOPRO 5.57231'12
Depth in / out
Mud Type
Lst
Type
Average
4583Background
(max)
Trip
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
0
high vis pill.
12:00 and 13:00. Well was flowed back thru choke and gas buster to pits. Circulate and conditioned mud and spotted another
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
9.0
12.25"
10.50
Mill Tooth
10.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Morning Report Report # 30
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
23-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
0
Chlorides
mg/l
5500
Trip in the hole to 2565' MD. Circulate and condition. Trip in the hole to 5650' MD, circulate and condition, establish
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Pumped cement plug. Tripped out of hole from 4966' MD to 2571' MD. Wait on cement. Run in the hole
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
5800
0
24-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 31
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
9.0
12.25"
10.50
Mill Tooth
10.50
Size
2565' MD
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
0
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
5Background
(max)
Trip
Average
N/A
Mud Type
Lst
Type
107.0
LSND 508.07231'12
Depth in / out
YP
(lb/100ft2)
10.10
000
--
CementCht Silt
C-4i C-4n
24 hr Max
40.0
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Cementing plug
PV
2360'
Footage
22.00
7231' 4651'
C. Henley / R. Dalton
ShClyst TuffGvlCoal
cP
13
Gas Summary
-
0 0
(current)
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
7231'
7231'
0'
Max @ ft Current
--
Date:
Time:
Mud Loss/Gain: 498 bbls lost down hole.
and tagged cement at 4513' MD. Tripped out of the hole to 2765' MD and spotted high viscosity pill.
4
in
0 -Minimum
Depth C-5n
-
-
C-2
13
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2.048
L-80
MBT
-
pH
0.942
-
0
-
Siltst
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
00
-
907-754-9459Unit Phone:
0
Todd A. Wilson
Maximum
Report By:Logging Engineers:Todd A. Wilson / Hilary Garney
Set AtSize
385.0
Grade
20"
7"
(max)(current)
Surface
0
-
Cly
0
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
.
.
*
24 hr Recap:
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
(max)(current)
Surface
0
-
Cly
0
Set AtSize
385.0
Grade
20"
7"
907-754-9459Unit Phone:
0
Todd A. Wilson
Maximum
Report By:Logging Engineers:Todd A. Wilson / Hilary Garney
0
-
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT
-
pH
0.942
-
0
-
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2.042
C-5n
-
-
C-2
8
in
0 -Minimum
Depth
Time:
Mud Loss/Gain: 12 bbls lost down hole.
conditioned mud and wait on cement. Reaming and washing from 1614' MD to 3145' MD with no sign of cement plug.
5
7231'
7231'
0'
Max @ ft Current
--
Date:
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
Gas Summary
-
0 0
(current)
C. Henley / R. Dalton
ShClyst TuffGvlCoal
cP
12
2360'
Footage
22.00
7231' 4651'
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Circulating
PV
24 hr Max
40.0
Weight
0
Hours
C-3
--
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
10.90
000
107.0
LSND 5.87231'16
Depth in / out
Mud Type
Lst
Type
Average
N/A3Background
(max)
Trip
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
100% Gas In Air=10,000 UnitsN/AConnection
0
Trip out of hole to shoe and wait on cement truck.
Circulate and condition while waiting on more cement to set another plug. Spotted 35 barrels of high viscosity pill.
2565' MD
110' MD
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
9.0
12.25"
10.50
Mill Tooth
10.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Morning Report Report # 32
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
25-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
0
Chlorides
mg/l
5300
Pumped 17 pounds per gallon cement plug. Trip out of the hole from 2762' MD to 1614' MD. Circulate and
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Circulate and condition mud at 2548' MD. Trip in the hole from 2543' MD to 2887' MD and circulate and condition.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
5300
0
26-Apr-2015
12:00 AM
Current Pump & Flow Data:
-
Max
ROP
ROP (ft/hr)
4.19 @
Mud Data
Depth
Morning Report Report # 33
Customer:
Well:
Area:
Location:
Rig:
SMU M-03
Brooks Range Petroleum
Kuparuk River Unit
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
95%
Rig Activity:
0
Nabors 16E Report For:
Condition
2-2-WT-A-E-1/16-NO-TD
Bit #
1
9.0
12.25"
10.50
Mill Tooth
10.50
Size
circulate and condition mud then run leak off test.
2565' MD
110' MD
100% Gas In Air=10,000 UnitsN/AConnection
0
Tools
-
API FL
Chromatograph (ppm)
20.0220' 2580'
WOB
Conductor
--
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
3Background
(max)
Trip
Average
N/A
Mud Type
Lst
Type
107.0
LSND 6.07231'18
Depth in / out
YP
(lb/100ft2)
10.90
000
--
CementCht Silt
C-4i C-4n
24 hr Max
40.0
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0902266356
Testing
PV
2360'
Footage
22.00
7231' 4651'
C. Henley / R. Dalton
ShClyst TuffGvlCoal
cP
10
Gas Summary
-
0 0
(current)
Avg
to-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
- Flow In (gpm)
Flow In (spm)
7231'
7231'
0'
Max @ ft Current
--
Date:
Time:
Mud Loss/Gain: 0 bbls lost down hole.
Rig up head pin and TIW and cement plug. Trip out of hole to 2123' MD and wait on cement. Run in hole to 2631' MD,
3
in
0 -Minimum
Depth C-5n
-
-
C-2
4
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2.042
L-80
MBT
-
pH
0.942
-
0
-
Siltst
9 5/8"
-
-
Units*
Casing
Summary
Lithology (%)
00
-
907-754-9459Unit Phone:
0
Todd A. Wilson
Maximum
Report By:Logging Engineers:Todd A. Wilson / Hilary Garney
Set AtSize
385.0
Grade
20"
7"
(max)(current)
Surface
0
-
Cly
0
9 130 1-1-WT-A-X-I-NO-TD2Hycalog PDC 8.75 0.773 58.60 2580'
WELL INFORMATION Created On : May 15 2015
Customer :Brooks Range Petroleum
Well Name :SMU M-03
Job Number :AK-XX-0906622356
Rig Name :Nabors 16E
Field Name :Kuparuk River Unit
Country :USA
Survey Report
SURVEY HEADER
Survey data provided by Schlumberger.
DIRECTIONAL SURVEY DATA
Tie-in
0.00 0.00 0.00 0.00 0.00 N 0.00 E
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
112.70 0.31 325.40 112.70 0.25 N 0.17 W 0.25 0.28
202.99 0.23 168.99 202.99 0.27 N 0.28 W 0.27 0.59
297.94 0.43 91.88 297.94 0.08 N 0.12 E 0.08 0.46
387.50 2.56 48.54 387.46 1.39 N 1.95 E 1.39 2.53
478.36 4.88 48.53 478.13 5.29 N 6.37 E 5.29 2.55
568.21 6.16 48.03 567.56 11.05 N 12.82 E 11.05 1.43
661.79 6.22 51.12 660.59 17.59 N 20.49 E 17.59 0.36
756.67 6.69 49.78 754.87 24.38 N 28.72 E 24.38 0.52
851.86 7.70 50.28 849.31 32.04 N 37.86 E 32.04 1.06
948.95 9.13 55.55 945.35 40.55 N 49.21 E 40.55 1.67
1043.63 11.00 60.92 1,038.57 49.19 N 63.30 E 49.19 2.21
1138.86 12.75 65.05 1,131.76 58.04 N 80.77 E 58.04 2.04
1236.42 14.00 60.02 1,226.68 68.48 N 100.75 E 68.48 1.75
1331.64 13.51 61.89 1,319.17 79.48 N 120.54 E 79.48 0.69
1427.74 13.95 61.17 1,412.52 90.35 N 140.59 E 90.35 0.49
1523.57 13.50 63.88 1,505.62 100.85 N 160.75 E 100.85 0.82
1619.05 13.64 68.29 1,598.43 109.92 N 181.22 E 109.92 1.09
1713.75 14.14 74.90 1,690.37 117.06 N 202.76 E 117.06 1.76
1809.88 14.82 85.42 1,783.46 121.10 N 226.36 E 121.10 2.82
1905.68 16.22 96.92 1,875.79 120.47 N 251.86 E 120.47 3.52
2001.28 16.97 103.83 1,967.41 115.53 N 278.67 E 115.53 2.21
2097.93 17.26 106.60 2,059.79 108.06 N 306.10 E 108.06 0.89
2193.97 19.58 116.11 2,150.92 96.90 N 334.22 E 96.90 3.95
2290.12 21.07 121.21 2,241.09 80.85 N 363.47 E 80.85 2.41
2386.27 21.94 119.00 2,330.55 63.19 N 393.97 E 63.19 1.24
2479.90 21.64 119.06 2,417.49 46.32 N 424.36 E 46.32 0.32
2508.91 21.58 118.84 2,444.46 41.15 N 433.70 E 41.15 0.35
2668.23 21.74 118.06 2,592.53 13.14 N 485.41 E 13.14 0.21
2762.72 21.75 117.76 2,680.29 3.25 S 516.34 E -3.25 0.12
2858.37 21.47 117.49 2,769.22 19.58 S 547.55 E -19.58 0.31
INSITE V8.1.10 Page 1Job No:AK-XX-0906622356 Well Name:SMU M-03 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
2954.94 21.38 118.43 2,859.12 36.12 S 578.71 E -36.12 0.37
3050.02 21.77 112.68 2,947.55 51.17 S 610.22 E -51.17 2.26
3145.72 21.45 108.69 3,036.52 63.62 S 643.17 E -63.62 1.57
3241.83 21.58 110.22 3,125.94 75.36 S 676.41 E -75.36 0.60
3338.14 21.34 112.87 3,215.57 88.29 S 709.17 E -88.29 1.04
3433.39 21.52 115.39 3,304.24 102.52 S 740.92 E -102.52 0.98
3529.64 21.56 119.77 3,393.77 118.87 S 772.23 E -118.87 1.67
3625.11 21.60 118.20 3,482.55 135.89 S 802.94 E -135.89 0.61
3719.48 21.44 117.35 3,570.34 152.02 S 833.57 E -152.02 0.37
3815.79 21.30 118.17 3,660.03 168.36 S 864.62 E -168.36 0.34
3910.78 21.48 117.44 3,748.48 184.52 S 895.27 E -184.52 0.34
4006.29 21.71 115.54 3,837.29 200.20 S 926.72 E -200.20 0.77
4101.61 21.69 111.51 3,925.86 214.26 S 959.02 E -214.26 1.56
4197.09 21.57 111.90 4,014.61 227.27 S 991.72 E -227.27 0.20
4292.92 21.54 115.97 4,103.75 241.55 S 1,023.88 E -241.55 1.56
4389.41 21.49 118.10 4,193.52 257.63 S 1,055.40 E -257.63 0.81
4485.59 21.39 117.42 4,283.04 274.00 S 1,086.51 E -274.00 0.28
4581.76 21.78 122.60 4,372.47 291.69 S 1,117.11 E -291.69 2.02
4676.28 21.92 129.91 4,460.22 312.46 S 1,145.42 E -312.46 2.88
4772.93 22.52 140.20 4,549.73 338.27 S 1,171.11 E -338.27 4.07
4868.57 24.06 145.17 4,637.58 368.35 S 1,193.98 E -368.35 2.61
4964.92 25.09 148.32 4,725.20 401.86 S 1,215.92 E -401.86 1.73
5061.44 26.21 154.95 4,812.23 438.59 S 1,235.70 E -438.59 3.19
5157.21 27.16 161.97 4,897.82 478.55 S 1,251.43 E -478.55 3.44
5252.52 28.04 171.19 4,982.32 521.39 S 1,261.59 E -521.39 4.57
5347.60 30.06 177.09 5,065.45 567.27 S 1,266.23 E -567.27 3.68
5443.36 32.94 178.13 5,147.09 617.26 S 1,268.30 E -617.26 3.06
5538.94 33.80 180.47 5,226.92 669.82 S 1,268.93 E -669.82 1.62
5635.19 37.05 180.70 5,305.34 725.59 S 1,268.35 E -725.59 3.38
5731.39 40.69 179.49 5,380.23 785.95 S 1,268.28 E -785.95 3.87
5826.58 43.97 180.24 5,450.59 850.04 S 1,268.41 E -850.04 3.49
5921.67 47.51 181.30 5,516.95 918.13 S 1,267.48 E -918.13 3.81
6017.93 51.11 182.60 5,579.70 991.06 S 1,264.97 E -991.06 3.88
6113.52 54.05 181.82 5,637.78 1,066.91 S 1,262.06 E -1066.91 3.14
6209.19 57.73 182.40 5,691.42 1,146.05 S 1,259.13 E -1146.05 3.88
6303.31 60.72 183.97 5,739.57 1,226.78 S 1,254.62 E -1226.78 3.48
6400.48 63.35 186.03 5,785.14 1,312.26 S 1,247.13 E -1312.26 3.29
6496.44 65.35 188.09 5,826.68 1,398.10 S 1,236.48 E -1398.10 2.84
6592.45 66.99 190.12 5,865.47 1,484.81 S 1,222.58 E -1484.81 2.58
6688.26 67.34 191.71 5,902.65 1,571.50 S 1,205.86 E -1571.50 1.57
6783.39 67.68 191.92 5,939.04 1,657.54 S 1,187.86 E -1657.54 0.41
6879.63 67.71 191.43 5,975.57 1,744.73 S 1,169.84 E -1744.73 0.47
6976.13 67.55 191.02 6,012.30 1,832.26 S 1,152.47 E -1832.26 0.43
7072.20 67.71 190.08 6,048.86 1,919.60 S 1,136.20 E -1919.60 0.92
7167.09 67.52 189.65 6,085.00 2,006.04 S 1,121.17 E -2006.04 0.46
INSITE V8.1.10 Page 2Job No:AK-XX-0906622356 Well Name:SMU M-03 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
7231.00 67.52 189.65 6,109.43 2,064.26 S 1,111.27 E -2064.26 0.00
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 0.00 degrees (Grid)
- A total correction of 0.00 deg from Magnetic north to Grid north has been applied
- Horizontal displacement is relative to the well head.
- Horizontal displacement (closure) at 7,231.00 feet is 2,344.38 feet along 151.70 degrees (Grid)
WARRANTY
HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION
AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY
SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND
INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS
THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY
RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL
RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC.
MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE
IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES
RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY
PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL
DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY
SERVICES, INC.
INSITE V8.1.10 Page 3Job No:AK-XX-0906622356 Well Name:SMU M-03 Survey Report