Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
217-021
1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Conductor Ext 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address: Stratigraphic Service 6. API Number: 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool?N/A Yes No 9. Property Designation (Lease Number): 10. Field: COLVILLE RIVER ALPINE OIL N/A 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 27,010' N/A N/A Casing Collapse Conductor Surface Intermediate Liner Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: 907-659-7506 Authorized Title: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng 7,413' - 7,492 Brennen Green / Roger Mouser 1/10/2026 27,000'12,178' 4 1/2" 7,494' 78' 7 5/8"14,941' 2,284' Perforation Depth MD (ft): 14,976' 4 1/2" 115' 2,183' 7,414' 115' 2,321' 20" 10 3/4" Size Proposed Pools: L-80 TVD Burst 14,870' MD STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 AA00092344 / AA00092347 / AA00094167 / FEE0NPRA04 217-021 P.O. Box 100630, Anchorage, Alaska 99508 50-103-20755-00-00 ConocoPhillips Alaska Inc. AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): 15,165' - 26,750' Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY N1927@conocophillips.com W.I. Field Supervisor COLVILLE RIV UNIT CD5-314X AA00081817 / 7,494' SSSV: Landing Nipple Packer: "HRD-E" ZXP Liner Top Packer SSSV: 2,126' MD / 2,022' TVD Packer: 14,822' MD / 7,406' TVD Length m n P 2 6 5 6 t N Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov 325-747 By Grace Christianson at 9:22 am, Dec 09, 2025 photo document DSR-12/9/25VTL 12/17/2025 10-404 TS 12/12/25JLC 12/17/2025 12/18/25 P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 December 9th, 2025 Commissioner Jessie Chmielowski Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Dear Commissioner Chmielowski, Please find enclosed the 10-403 application for Sundry Approval from ConocoPhillips Alaska, Inc. for well ALP CD5-314X (PTD 217-021) to extend the conductor. Summary: Conductor has subsided or well has grown ~5. With AOGCC approval we would like to add conductor material to cover the production casing. Please contact Brennen Green or Roger Mouser at 659-7506 if you have any questions. Sincerely, Well Integrity Field Supervisor ConocoPhillips Alaska, Inc. ConocoPhillips Alaska, Inc. P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 Alpine Well CD5-314X (PTD 217-021) SUNDRY NOTICE 10-403 APPROVAL REQUEST December 9th, 2025 This application for Sundry approval for Alpine well CD5-314X is to extend the conductor to original height to stabilize tree and prevent corrosion to the surface casing. At some point during normal operations the conductor subsided, or the well has grown ~5. With approval, the conductor extension will require the following general steps: 1. Remove landing ring from conductor if necessary. 2. Extend the conductor to starter head. 3. File 10-404 with the AOGCC post repair (with photo documentation). Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By LAST TAG: CD5-314X jennalt Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason: Schematic Update CD5-314X 7/27/2023 oberr Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread CONDUCTOR 20 19.12 36.7 115.0 115.0 78.34 H-40 SURFACE 10 3/4 9.95 36.6 2,320.7 2,182.7 45.50 L-80 Hyd 563 INTERMEDIATE 7 5/8 6.88 34.5 14,976.0 7,413.9 29.70 L80 Hyd563 LINER 4 1/2 3.96 14,822.2 27,000.0 7,494.0 12.60 L-80 TXP Tubing Strings: string max indicates LONGEST segment of string Top (ftKB) 31.6 Set Depth 14,869.7 Set Depth 7,409.1 String Ma 4 1/2 Tubing Description Tubing Production Wt (lb/ft) 12.60 Grade L-80 Top Connection TXP ID (in) 3.96 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 31.6 31.6 0.07 HANGER 11.000 FMC 4-1/2" Tubing Hanger TXP FMC TC-EMS 11" 4.500 2,126.0 2,021.9 32.95 NIPPLE 5.000 Landing Nipple,4 1/2",X,3.813",TXP 3.813 4,718.2 3,403.7 64.78 GAS LIFT 6.437 GLM KBMG,4 1/2" X 1",TXP, Camco w/Dummy Valve CAMCO KBMG 3.860 9,778.9 5,597.9 64.32 GAS LIFT 6.437 GLM KBMG,4 1/2" X 1",TXP, Camco w/Dummy Valve CAMCO KBMG 3.860 13,195.7 7,071.4 67.48 GAS LIFT 6.437 GLM KBMG,4 1/2" X 1" TXP, Camco SDCK-2 2500 psi IA - Tubing CAMCO KBMG 3.860 13,465.1 7,169.2 70.37 Gauge / Pump Sensor 4.500 Solid Gauge Mandrel w/ encapsulated I-wire, 4-1/2" 12.6# TXP PxP CAMCO Solid gauge mandrel 3.958 13,521.8 7,187.8 71.48 NIPPLE 5.000 Landing Nipple,4 1/2",X,3.813",TXP 3.813 14,829.5 7,406.4 86.19 LOCATOR 5.380 Locator sub BAKER GHB-22 3.870 14,831.0 7,406.5 86.19 SEAL ASSY 4.730 GBH-22 Seal Assembly BAKER 192-47 3.870 Mandrel Inserts : excludes pulled inserts Top (ftKB) Top (TVD) (ftKB) Top Incl (°) St ati on No /S Serv Valve Type Latch Type OD (in) TRO Run (psi) Run Date Com Make Model Port Size (in) 4,718.2 3,403.7 64.78 1 GAS LIFT GLV BK 1 1,953.0 7/28/2017 KBMG 0.188 9,778.9 5,597.9 64.32 2 GAS LIFT GLV BK 1 2,033.0 7/28/2017 KBMG 0.188 13,195.7 7,071.4 67.48 3 GAS LIFT OV BK 1 0.0 7/28/2017 KBMG 0.250 Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 14,822.2 7,405.9 86.21 PACKER 5.500 "HRD-E" ZXP Liner Top Packer (11" SBE) Baker ZXP-HD 4.820 14,841.9 7,407.2 86.17 NIPPLE 5.500 "RS" Packoff Seal Nipple Baker RS 4.850 14,874.2 7,409.4 86.18 XO REDUCING 5.500 XO, 5.5" HYD563 Box x 4.5" TXP Pin 3.920 14,920.5 7,412.3 86.72 NIPPLE 4.500 Nipple Landing, 4-1/2" "XN", 3.75", TXP 3.750 HORIZONTAL, CD5-314X, 7/27/2023 7:47:23 AM Vertical schematic (actual) LINER; 14,822.2-27,000.0 SHOE; 26,995.6-27,000.0 PERF PUP; 18,881.9-18,886.8 INTERMEDIATE; 34.5-14,976.0 FLOAT SHOE; 14,973.4- 14,976.0 NIPPLE; 14,920.5-14,921.7 XO REDUCING; 14,874.2- 14,875.2 SBE; 14,854.5-14,874.2 SEAL ASSY; 14,831.0 HANGER; 14,844.7-14,854.5 NIPPLE; 14,841.8-14,844.7 PACKER; 14,822.2-14,841.8 LOCATOR; 14,829.5 NIPPLE; 13,521.8 Gauge / Pump Sensor; 13,465.1 GAS LIFT; 13,195.7 GAS LIFT; 9,778.8 GAS LIFT; 4,718.2 SURFACE; 36.6-2,320.7 Float Shoe; 2,318.0-2,320.7 NIPPLE; 2,126.0 CONDUCTOR; 36.7-115.0 Casing Hanger; 36.6-36.8 CASING HANGER; 34.5-35.2 HANGER; 31.6 WNS PROD KB-Grd (ft) 36.55 RR Date 7/24/2017 Other Elev CD5-314X ... TD Act Btm (ftKB) 27,010.0 Well Attributes Field Name NANUQ KUPARUK Wellbore API/UWI 501032075500 Wellbore Status PROD Max Angle & MD Incl (°) 91.98 MD (ftKB) 17,566.83 WELLNAME WELLBORECD5-314X Annotation LAST WO: End DateH2S (ppm) DateComment SSSV: NIPPLE December 16, 2025 Commissioner Jessie Chmielowski Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Commissioner Jessie Chmielowski: Enclosed please find a spreadsheet with a list of wells from the Alpine field. Each of these wells were found to have a void in the conductor. These voids were filled with cement if needed. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. The attached spread sheet presents the well name, top of cement depth prior to filling and volumes used on each conductor. Please call Brennen Green or Roger Mouser at 907-659-7506, if you have any questions. Sincerely, ConocoPhillips Well Integrity Field Supervisor ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement Top-off Report of Sundry Operations (10-404) Alpine Field Well Name API #PTD # Initial top of cement Vol. of cement pumped Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls in gal CD5-314X 50-103-20755-00-00 217-021 6.08'1.4 4"12/15/2025 N/A N/A Date 12/16/25 CD5 From:Daniel Sherwood To:Elgarico, Richard E; Fanny Haroun Cc:Lemke, Sandra D; Hobbs, Greg S Subject:RE: [EXTERNAL] CD5-314 Data Date:Tuesday, February 20, 2024 1:46:53 PM Richard, I have looked through our data archive and cannot find what you are looking for. None of the employees for Surface Data Logging that were employed at that time currently work for Halliburton. I apologize I could not be more help. Regards, Daniel Sherwood SDL Field General / Service Coordinator Halliburton Sperry Drilling Services 6900 Arctic Blvd. Anchorage AK 99518 Cell: 907 362 3498 From: Elgarico, Richard E <Richard.E.Elgarico@conocophillips.com> Sent: Tuesday, February 20, 2024 11:26 AM To: Fanny Haroun <Fanny.Haroun@halliburton.com>; Daniel Sherwood <Daniel.Sherwood@halliburton.com> Cc: Lemke, Sandra D <Sandra.D.Lemke@conocophillips.com>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> Subject: RE: [EXTERNAL] CD5-314 Data Hi Daniel, Just following up if you have any luck finding the data we are looking for? Thank you, Ricky From: Elgarico, Richard E Sent: Tuesday, February 6, 2024 12:52 PM To: Fanny Haroun <Fanny.Haroun@halliburton.com>; Daniel Sherwood <Daniel.Sherwood@halliburton.com> Cc: Lemke, Sandra D <Sandra.D.Lemke@conocophillips.com>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> Subject: FW: [EXTERNAL] CD5-314 Data Fanny and Daniel, Any luck in finding the mudlog LAS file for CD5-314? Thanks, Ricky From: Elgarico, Richard E Sent: Wednesday, January 31, 2024 4:11 PM To: Fanny Haroun <Fanny.Haroun@halliburton.com> Cc: Daniel Sherwood <Daniel.Sherwood@halliburton.com>; Lemke, Sandra D <Sandra.D.Lemke@conocophillips.com> Subject: RE: [EXTERNAL] CD5-314 Data Fanny, Thank you for checking. I did confirm with some of our folks here and we believe that Halliburton did the mudlog but probably just in the surface section. Please see attached PDF. AOGCC is only looking for the LAS. Thanks, Ricky From: Fanny Haroun <Fanny.Haroun@halliburton.com> Sent: Wednesday, January 31, 2024 2:51 PM To: Elgarico, Richard E <Richard.E.Elgarico@conocophillips.com> Cc: Daniel Sherwood <Daniel.Sherwood@halliburton.com> Subject: RE: [EXTERNAL] CD5-314 Data CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Ricky, Daniel tried to look in their archive, it doesn’t seem that they have the data from 2015. Are you sure it was Halliburton mud logging that did the job? Regards, Fanny From: Elgarico, Richard E <Richard.E.Elgarico@conocophillips.com> Sent: Wednesday, January 31, 2024 2:27 PM To: Fanny Haroun <Fanny.Haroun@halliburton.com> Subject: [EXTERNAL] CD5-314 Data External Sender: Use caution with links/attachments. Hi Fanny, I have an urgent request. AOGCC is looking for mud log for CD5-314 and CD5-314PB1 and I don’t think it has been delivered to us or to the State. I don’t have any contact information for the Halliburton mud log team, is this something you can help me please? Thank you in advance, Ricky This e-mail, including any attached files, may contain confidential and privileged information for the sole use of the intended recipient. Any review, use, distribution, or disclosure by others is strictly prohibited. If you are not the intended recipient (or authorized to receive information for the intended recipient), please contact the sender by reply e-mail and delete all copies of this message. DATA SUBMITTAL COMPLIANCE REPORT 1/10/2018 Permit to Drill 2170210 Well Name/No. COLVILLE RIV UNIT CD5-314X Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20755-00-00 MD 27010 TVD 7494 Completion Date 7/22/2017 Completion Status 1 -OIL Current Status 1 -OIL UIC No REQUIRED INFORMATION / Mud Log No J Samples No ✓ Directional Survey Yes DATA INFORMATION List of Logs Obtained: GR/Res (from Master Well Data/Logs) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH ! Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments_ ED C 28535 Digital Data 32 2331 8/22/2017 _ Electronic Data Set, Filename: CD5- _ 314X Scope_Gamma Ray_RM_LAS_LW D001.las ED C 28535 Digital Data 2290 14986 8/22/2017 Electronic Data Set, Filename: CD5- 314X_Scope_Resistivity_RM_LAS _LWD002.las , ED C 28535 Digital Data 14946 17956 8/22/2017 Electronic Data Set, Filename: CD5- - 314X_Scope_Resistivity_RM_LAS_LW D003.las ED C 28535 Digital Data 17916 21430 8/22/2017 Electronic Data Set, Filename: CD5- 314X_Scope_Resistivity_RM_LAS _L W D004.las ED C 28535 Digital Data 21390 27010 8/22/2017 Electronic Data Set, Filename: CD5- 314X_Soope_Resistivity_RM_LAS_LWD005.1as ED C 28535 Digital Data 32 27010 8/22/2017 Electronic Data Set, Filename:: C05- 314X_Scope_Resistivity_RM_LAS.Ias ` ED C 28535 Digital Data 822/2017 Electronic File: CD5- 314X_Scope_Resistivity_RM_LWD002_DLIS.dlis , ED C 28535 Digital Data 8/22/2017 Electronic File: CD5- 314X_Scope_Resistivity_RM_LW0002_DLIS.htm , I ED C 28535 Digital Data 8/22/2017 Electronic File: CD5- 314X_Scope_Resistivity_RM_LWD003_DLIS.dlis ED C 28535 Digital Data 8/22/2017 Electronic File: CD5- 314X_Scope_Resistivity_RM_LW D003_DLIS.htm I ED C 28535 Digital Data 8/22/2017 Electronic File: CD5- 314X_Scope_Resistivity_RM_LWD004_DLIS.dlis AOGCC Page 1 of 3 Wednesday, January 10, 2018 DATA SUBMITTAL COMPLIANCE REPORT 1/1012018 Permit to Drill 2170210 Well Name/No. COLVILLE RIV UNIT C05 -314X Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20755-00-00 MD 27010 TVD 7494 ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data ED C 28535 Digital Data AOGCC Completion Date 7/22/2017 Completion Status 1-0I1 Page 2 of 3 Current Status 1 -OIL UIC No 8/22/2017 Electronic File: CM— 314X_Scope_Resistivity_RM_LW D004_DLIS.htm� I 8/22/2017 Electronic File: CD5- 314X_Scope_Resistivity_RM_LWD005_DLIS.dlis . 8/22/2017 Electronic File: CD5- 314X_Scope_Resistivity_RM_LWD005_DLIS.htm . 1 8/22/2017 Electronic File: CD5- 314X_TeleScope_Gamma_Ray_RM_LW D001_D LIS.dlis 8/22/2017 Electronic File: CD5- 314X_ TeleScope_Gamma_Ray_RM_LWD001 D . LIS.html 8/22/2017 Electronic File: C05- 314X_Scope_Resistivity_RM_DLIS.dlis . 8/22/2017 Electronic File: CD5- 314X_ Scope_Resistivity_RM_DLI S.htm I . 8/22/2017 Electronic File: CD5- 314X_Scope_Resistivity_2MD_RM.PDF . 8/22/2017 Electronic File: CD5- 19 314X_Scope_ResistMty_2T VD_R M. PDF - 8/22/2017 Electronic File: CD5- P 314X_Scope_Resistivity_5MD_RM.PDF 8/22/2017 Electronic File: CD5- 314X_Scope_Resistivity5TVD_RM.PDF' 8/22/2017 Electronic File: CD5-314X NAD27 EOW Compass Surveys.pdf 8/22/2017 Electronic File: CD5-314X NAD27 [Canvas].txt . 822/2017 Electronic File: CD5-314X NAD27 [Macro].txt 8/22/2017 Electronic File: CD5-314X NAD27 [Petrel].txt' 8/22/2017 Electronic File: CD5-314X NAD27 [Surveys].txt . !, 8/22/2017 Electronic File: CD5-314X NAD83 EOW Compass Surveys.pdf 822/2017 Electronic File: CD5-314X NAD83 [Canvas].txt 8/22/2017 Electronic File: CD5-314X NAD83 [Macro].txt Wednesday, January 10, 2018 DATA SUBMITTAL COMPLIANCE REPORT 1/10/2018 Permit to Drill 2170210 Well. Name/No. COLVILLE RIV UNIT CDS-314X Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20755.00-00 MD 27010 TVD 7494 Completion Date 7/22/2017 Completion Status 1-0I1. Current Status 1 -OIL UIC No ED 7C 28535 Digital Data 8/22/2017 Electronic File: CD5-314X NAD83 [Petrel].txt . ED C 28535 Digital Data 8/22/2017 Electronic File: CD5-314X NAD83 [Surveys].txt ED C 28535 Digital Data 8/22/2017 Electronic File: CD5-314X_Final Surveys.csv _ _ Log C 28535 Log Header Scans 0 0 2170210 COLVILLE RIV UNIT CD5-314X LOG HEADERS Well Cores/Samples Information: Name INFORMATION RECEIVED Completion Report Q Production Test Informatio Y / NA Geologic Markers/Tops COMPLIANCE HISTORY Completion Date: 7/22/2017 Release Date: 3/22/2017 Description Comments: Interval Start Stop Directional / Inclination Data QY Mechanical Integrity Test Information Y NN Daily Operations Summary y Date Comments Compliance Reviewed By:�+ Sample Set Sent Received Number Comments Mud Logs, Image Files, Digital Data f^Y19 Composite Logs, Image, Data Files V Cuttings Samples Y NA Core Chips Y / q Core Photographs Y Laboratory Analyses YD NA 1 03 AO(.( ( Page 3 of 3 Wednesday, January 10, 2018 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION RECEIVED AUG 2 3 2011 WELL COMPLETION OR RECOMPLETION REPORT , UGM 1a. Well Status: OIID ` Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended❑ 20AAC 25.105 20AAC 25.110 GINJ❑ WINJ❑ WAG[] WDSPL❑ No. of Completions: 1b. Well Class: Development 0 • Exploratory ❑ Service El Stratigraphic Test [I 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or 7jL2/i9 Abend.: 3/90F49117 14. Permit to Drill Number/ Sundry: 217-021 , 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: 6/11/2017 15. API Number: 50-103.20755-00-00 . 4a. Location of Well (Governmental Section): Surface: 369' FNL, 2694' FEL, Sec 18, T11N, R4E, UM Top of Productive Interval: 515' FNL, 2733' FEL, Sec 25, T11 N, RX, UM Total Depth: 1805' FNL, 1094' FEL, Sec 1, T10N, RX, UM 8. Date TD Reached: 7/16/2017 16. Well Name and Number: CRU CDS-314X 9. Ref Elevations: KB:70.35 GL: 33.8 BF: 17. Field / Pool(s): Colville River Unit/Alpine Oil Pool 10. Plug Back Depth MD/TVD: 27000/7494 18. Property Designation: , ASRC-NPR4, AA092344, AA092347, AADM167, 081817 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 349284 y- 5965844 Zone- 4 TPI: x- 344099 y- 5955243 Zone- 4 Total Depth: x- 345496 y- 5943362 Zone- 4 11. Total Depth MD/TVD: 2701017494 19. DNR Approval Number: 932669,340758,340757,932552,366608 12. SSSV Depth MD/TVD: NIA 20. Thickness of Permafrost MD/TVD: 134211321 5. Directional or Inclination Survey: Yes ❑Q , (attached) No ❑ Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re-drill/Lateral Top Window MD/TVD: N/A 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER GRADE SETTING DEPTH MD SETTING DEPTH ND I HOLE SIZE CEMENTING RECORD AMOUNT FT. TOP BOTTOM TOP BOTTOM PULLED 20 94 H-40 37 115 37 115 42 10 yds 103/4 45.5 L-80 37 2321 37 2183 131/2 1009 sx 11.0 ppg LiteCrete 75/8 29.7 L-80 34 14976 34 7414 9 7/8 x 10.5 230 sx 15.8 ppg Class G 41/2 12.6 L-80 14822 27000 7406 7494 63/4 Liner 24. Open to production or injection? Yes ❑� No ❑ If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): Pre -Perforated Pups @: 15165 - 26750 MD and 7413 - 7492 TVD COMPLETION ATF VERIFIED 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 41/2 1 14869 14822/7406 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No ❑Z Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: 7 /2 912 01 7 Method of Operation (Flowing, gas lift, etc.): FLOWING Date of Test: 7/29/2017 Hours Tested: 83 Production for Test Period Oil -Bbl: 26,733 Gas -MCF: 8,822 Water -Bbl: 439 Choke Size: Gas -Oil Ratio: 1011 Flow Tubing Press. 1707 Casinq Press: 101 Calculated 24 -Hour Rate Oil -Bbl: 7 7 Gas -MCF: 2.551 Water -Bbl: 127 Oil Gravity -API (torr): 4 Form 10-407 Revised 5/2017 Zq � /_' CONTINUED ON PAGE 2 RBDMS k- AUG 2 5 2017 Submit ORIGINIAL oN �lSb !191$ A sC/7 28. CORE DATA Conventional Corals): Yes ❑ No ❑� Sidewall Cores: Yes ❑ No ❑� If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑Q If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1342 1321 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 14976 7414 information, including reports, per 20 AAC 25.071. Formation @ TPI - Kuparuk C C-30 2473 2302 K-3 5522 3750 K-2 6098 3999 Albian 97 6885 4341 HRZ 13642 7224 Kalubik 13908 7293 Kuparuk C 14887 7410 TD 27010 7494 Formation at total depth: Ku aruk C 31. List of Attachments: Daily Operations Summary, Cement Report, Definitive Survey, Schematics Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report. production orwell test results, per 20 AAC 25V0. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: G.L. Alvord Contact Name: Will Earhart Authorized Title: Alaska Drilling Manager Contact Email: William.C.Earhart<(dco.corn Authorized Contact Phone: 265-1077 8(�( Z`� Signature: -'!--�.� Date: INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item tb: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Sall Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vilrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10407 Revised 5/2017 Submit ORIGINAL Only CD5-314X Kuparuk C Sand Producer 20" Conductor to 116' Upper Completion: Length 1) 4-'A' 12.6#/ft TXP 3) X 3.813 2) 4-1%"x 1" Camco KBMG GLM (W) w/ DV 7' 3) 4-1/2"x V Camco KBMG GLM (xx*) w/ DV 7' 4)4-1/Vx 1" Carrico KBMG GLM (xxo)w/DCK2 71 pinned for 2500 psi casing to tbg shear 1 3.813" DB Nipple 5) Downhole Gauge 1.5' 6) X nipple 3.813" ID 7) Seal Assembly 20 10-314" 45.5 ppf L-80 HYD-6631BTCM 2,314' MID Lower Completion: 8) ZXP Liner Top Packer & Flexiock Liner Hanger and Seal Bore 37 9) XO THydril 521 Box X 4-/" TXP pin 10) XN nipple 3.76'ID 1.51 11) 4'/z ,12.6#/ft, L-80 SLHT Slotted Liner 4-1/2" 12.6 ppf L-80 HYD -563 14,880- MID GLM set above packer 4-%" 12.6 ppf L-80 Liner SLHT Slotted Liner 14,a36- - 27,010' MID ........... . - — — — — — — — — — — — — — — — -- — — — — — — — — — — 0 0 0 0 0 0 0 0 0 ------------------------------------- 6-3/4" Hole 7 518" 29.7 ppf L-80 HYD-563/BTCM 14,986' MD CD5-314X Kuparuk C Sand Producer I 20" Conductor to 115' Upper Completion: Lenath 1) 4-'/2" 12.6#/ft TXP 1 3) X 3.813" 1 2) 4-1/2"x 1" Camco KBMG GLM (4718' MD @65° inc) 7' I 3) 4-'/2" x 1" Camoo KBMG GLM (9778' @640 inc) 7' 1 I 4) 4 '/" x 1" Camco KBMG GLM (13196' @ 67° inc) 7' 3.813" X Nipple, 2,125' MD 5) Downhole Gauge 1.5' 1 6) X nipple 3.813" ID 1 I 7) Seal Assembly 20' 10-3/4" 45.5 ppf L-80 HYD-563/BTCM 2.321' MD Lower Completion: 1 8) ZXP Liner Top Packer & Flexlock Liner Hanger and Seal Bore 37, j 9) XO 5" Hydril 521 Box X 4-'/2" TXP pin 1 10) XN nipple 3.75" ID 1.5' I I 11) 4 '/", 12.6#/1ft, L-80 TXP Liner with Perf Pups I I I GLM, 4,718' MD ° I I I 4-1/2" 12.6 ppf L-80 TXP I I I I 14.830' MD I I I 1 I I I 1 I GLM, 9.778MD " I I` 1 `\\\ GLM, 13,195' MD Downhole Gauge, 13,196MD 3.813" X Nipple, 13,521' MD 3.75" X Nipple, 13,521' MD 4-'/" 12.6 ppf L-80 TXP Liner w/ pre-perf pups 14,822' — 27,000' MD k' O O O O O O O --------------------------------- - _______----_---____..._..___ _ ___------_-______.-____ 7 5/8" 29.7 ppf L-80 HYD-563/BTCM 14,976' MD ZXP Liner Top Packer, 14,822' MD 6-3/4" Hole WNS PROD CD5-314X LonoeornmlpS m1mija6limeem Well Attributes Max Angle SMD TD A (�. We114on PPYUWI FWtl Nome 5010320]5500 NANUGKUPARUK Wellnon SlYus PROD ncl l'1 MDIXKB) 91.98 9,Sfifi.83 PCI ell IXKBI 2],0100 SS 1NIPPLE X33Ippm1 0.b LASTO_ Ene 0a4 K&Gw IX) 3855 RIB Oen Rel""1] 4r2017 NORQONTPL-Cp5.31i%, Y/]Q0113'JO'.Si PM ew wwN _. XANc6R:314- M71T TA WpIM1 ItIXe) Ene OeY M RE; Wnalt ey IAST TAG: REV REASON'. NEW WELL, GLV C/O jennal Entl On 022201] _.... _.. asmg Strings oD (In) ID linl TOP IXKBI sn spm 1X 13) Sel pplx fTv01... NNbn P... Gram TOPTnwe CCIADU:nipron CONDUCTOR 20 19.124 36.] 1150 1150 ]8.34 Hd(1 ,esinP ce-ppn Wlnl ID(In)Tep(ftM:) SURFACE 103/4 9.950 368 en-pp'") n-pp'(fl1B SNRPe(1V01^. VNbnIL.. epee 2,320.1 2,102.7 45.50 LA0 Tep Th -d Hy0563 CMDULTOR:361-1154 xIPPLE;1380 F.In80m[nplgn CD(I') ID lln) Tap(XI(B) INTERMEDIATE ]BR 8.8]5 34.5 Sel0.p 14,97 Set C4pN 7.413... WIM1Pn (I... Gntln 14.978.0 ],413.9 29.]0 LBO TOP TnIYe HyE583 CesinB DnaCnptien In) ID lln) TOPI3KB1 LINER 411 3.958 14,822.2 3M DwNIXKB) Set DeWM1 (VD1... Wtlbn ry.. GraG 2),000.0 7'4940 12." LA0 11.p TXP Liner Details SUPfPLE:3a 8$a, Top 1X,1321 rOP(rv7405,1 mp mal l°1 Ilam on com uom1ne ID ..) lint GASUfT:4)14z 14,022.2 ]005.9 M21 PACKER 'HROE-Z PLiner Top Parher(11°SBE) 4.820 14.041.9 7,07.2 86.17 NIPPLE 'RS'Pec Seal Nipple 4.850 GPBufT:9Am9 14,044.7 7,407.4 86.1] HANGER 'OG'Flex-Lock Linerflanger 4.830 14, 54.5 ),408.1 88.15 SBE heel Bole E%lensbn 4.750 vAs uFT'n 3.105.1 14,074.2 74094 86.18 XOREDUCING XO,5WW05MB=x4.STXPPIn 3.920 Loge rPump Seam: 13488.1 149205 74123 86.72 NIPPLE Nipple Lan0in9,4-1/2''XN', 375', TXP 3.750 Tubing Strings xIPPLe 13sz1 a Tubi 0.sStri n senna Ma._ 1D linl TOP IXKeI Stl TUBING 412 3.958 31A CaPln (X.. 5m "en (ryDl 1... w10o12 L-80 TX 14869] ),409.1 12.60 L-80 TXP Conngien Completion Details Top IXK3 TO ( 1 p(TVD)eMBI Top Intl °I Ibm Oes LOm Nmnlnel lD (in) LOLAMR: µ0N.5 3t(l 31.6 007 HANGER FMC4-1.2 HaflgerTXP 4500 2.12&0 2,021.9 32.95 NIPPLE Laftn9 Nipple,41/2',X,3813',W 3.813 sEA Assy 14.w1.D 13.465.1 7,169.2 70.37 Gau9el Pump Soli Gauge MentllelWen.,.4t.di..,4-1292.6M .58 Sensor TXPP 13,518 778].8 ]10 NIPPLE Lalling Nipple,4ll'.X,3.813',TXP 3.813 14,8285 7,4064 .19 LOCATOR L.Wr.b 3.870 14,8310 7,406.5 88.19 SEALASSV GBH -22 Seal Assembly 3.870 INTERMEDIATE U514,976,0 Mandrel Inserts 81 N X T opMW Meeh OD pnl j707I VaIW lelcn PMSI- TRO Rue Sen' TYW Type (In) (.I Run OM Lom CAMCO KBMG 1 GAS LIFT GLV BK 0.188 1,953.0]24201] 2 OAMCO KBMGgm 3 CAMCO KBMG 1 GAS LIFT OV BK 0.250 0.0 )2&209 l® mm Hum mm m mm am t� KIM M3 to JIM lM t� t� uNEfl: f4,033RN,DNO- " Operations Summary (with Timelog Depths) CD5-314X iiii6ll rr. Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stmt Tama End Tima Cur(hr) Phase op Code An,t, Code Time P -T -X opensbon start Depth (rt KB) End Depen (fuC6) 6/11/2017 6/11/2017 0.75 MIRU MOVE RURD P Finished move check list and R/D 0.0 0.0 00:00 00:45 service lines. 6/11/2017 6/11/2017 1.50 MIRU MOVE MOB P Moved pits away from sub. Skidded 0.0 0.0 00:45 02:15 Rig floor, raised cellar wind walls and raised stompers. 6/11/2017 6/11/2017 1.50 MIRU MOVE MOB P Moved sub from CD5-17 and staged 0.0 0.0 02:15 03:45 cellar equipment on CD5-314X. Removed lower wind wall on ODS. 6/11/2017 6/11/2017 2.00 MIRU MOVE MOB P Moved sub over to CD5-314X and 0.0 0.0 03:45 05:45 spotted over conductor. Lowered wind walls and stompers. Skidded rig floor back in to position. 6/11/2017 6/11/2017 1.50 MIRU MOVE MOB P Moved pits into position and spotted 0.0 0.0 05:45 07:15 pipe shed. 6/11/2017 6/11/2017 3.00 MIRU MOVE RURD P Rig up service lines steam lines, 0.0 0.0 07:15 10:15 water, and air. Continue working on pre -accept check list. "Rig on Hi Line at 9:00" 6/11/2017 6/11/2017 1.75 MIRU MOVE RURD P Installed surface riser, flow lines, 0.0 0.0 10:15 12:00 bleeder hole fill, and turnbuckles. Take on 9.6 ppg ddlplex to pits. RKB to GL= 36.55', To LR= 36.66 "Accept rig at 12:00" 6/11/2017 6/11/2017 1.75 MIRU MOVE RURD P Hook up koomy unit, prime pumps and 0.0 0.0 12:00 13:45 load pipe in shed. 6/11/2017 6/11/2017 3.75 MIRU MOVE PULD P P/U and rack back 20 stands of 5" DP 0.0 0.0 13:45 17:30 and 7 stands of 5" HWDP. Tested gas alarms. 6/11/2017 6/11/2017 0.75 MIRU MOVE RURD P Calibrated MWD block height. 0.0 0.0 17:30 18:15 6/11/2017 6/11/2017 1.50 MIRU MOVE BHAH P MIN surface BHA as per SLB to 194'. 0.0 194.0 18:15 19:45 6/11/2017 6/11/2017 0.25 MIRU MOVE SFTY P Held prespud meeting. 194.0 194.0 19:45 20:00 6/11/2017 6/11/2017 0.25 MIRU MOVE SEQP P Pressure tested mud lines to 3500 psi. 194.0 194.0 20:00 20:15 6/11/2017 6/12/2017 3.75 SURFAC DRILL DDRL P Drilled f/ 119'to 295' MD w/ Gyro 194.0 295.0 20:15 00:00 surveys. 50 rpm, 450 gpm, 660 psi, 5- 10 WOB. 6/12/2017 6/12/2017 0.75 SURFAC DRILL DDRL P Drilled f/ 295'to 340' MD 450 gpm, 295.0 340.0 00:00 00:45 632 psi, 5-10 WOB. 6/12/2017 6/12/2017 0.50 SURFAC DRILL OWFF P OWFF, Well static. Cleared drag 340.0 340.0 00:45 01:15 chain of obstructions. 6/12/2017 6/12/2017 3.75 SURFAC DRILL DDRL P Drill V 340'10 610' MD w/ 450 gpm; 340.0 610.0 01:15 05:00 660 psi, 60 rpm, 2.1k TQ. 6/12/2017 6/12/2017 0.75 SURFAC DRILL OWFF P OWFF , P/U 2 jts and installed jars as 610.0 610.0 05:00 05:45 per SLB. P/U= 95, S/0= 92. 6/12/2017 6/12/2017 16.75 SURFAC DRILL DDRL P Drilled 0 660'to 2,331' MD, 2,191' 610.0 2,331.0 05:45 22:30 TVD. 60 rpm, 750 gpm, 2420 psi, 35 WOB, P/U= 136, S/0= 119, ROT= 123. Observed an increase in chlorides and flow at -650' MD and increased MW f/ 9.5 ppg to 10 ppg. Again observed slight flow on connections at -2200' MD and increased MW to 10.1 ppg. Page 1130 Report Printed: 8/16/2017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Tune Eml Tune Dur(hr) Phase Op Code Achviry Colla Time P -T -X O pentb Start Depth (eKB) End Depth (IM) 6/12/2017 6/13/2017 1.50 SURFAC CASING CIRC P Took final survey, pumped a 32 bbl 2,331.0 2,057.0 22:30 00:00 nut plug sweep and started circulating 3x BU f12,331'to 2,057' MD, racking back 1 stand/BU. 750 gpm, 2170 psi, 60 rpm, 2.5-3k TQ. 6/13/2017 6/13/2017 0.25 SURFAC CASING CIRC P Finished circulating BU at 750 gpm, 2,057.0 2,057.0 00:00 00:15 2170 psi, 2.5-3k TQ. 6/13/2017 6/13/2017 0.75 SURFAC CASING OWFF P OWFF, 30 min. Well static. 2,057.0 2,057.0 00:15 01:00 6/13/2017 6/13/2017 0.50 SURFAC CASING TRIP P POOH f/ 2,057'to 1,585'MD. P/U= 2,057.0 1,585.0 01:00 01:30 134, S/0= 115. Observed improper hole fill after 5 stands. , 6/13/2017 6/13/2017 0.50 SURFAC CASING CIRC P Circulated BU while R/B a stand. 750 1,585.0 1,493.0 01:30 02:00 gpm, 2070 psi, 40 rpm, 2.4k TO. 6/13/2017 6/13/2017 2.00 SURFAC CASING PMPO P Pump OOH f/ 1,493'to 557' MD. 500 1,493.0 557.0 02:00 04:00 gpm, 990 psi, P/U= 115, S/O= 109. Reduced rate to 300 gpm, 460 psi at permafrost (1351' MD). Observed clay unload on shackers while coming out. 6/13/2017 6/13/2017 0.50 SURFAC CASING TRIP P POOH on elevators f/ 557'to 191' MD. 557.0 191.0 04:00 04:30 6/13/2017 6113/2017 1.75 SURFAC CASING BHAH P UD surface BHA as per SLB. 191.0 0.0 04:30 06:15 Calculated fill= 29.2 bbl, actual= 59 bbl. 6/13/2017 6/13/2017 1.75 SURFAC CASING RURD P Cleared floor and R/U casing running 0.0 0.0 06:15 08:00 equipment for 10 3/4" casing. 6/13/2017 6/13/2017 5.25 SURFAC CASING PUTB P M/U shoe track and Bakedok first 4 0.0 1,418.0 08:00 13:15 joints, checked floats and dg w/ 10 13/4"45.5# H563 to 1,418' MD. 6/13/2017 6/1312017 0.50 SURFAC CASING CIRC P Circulated and conditioned mud at the 1,418.0 1,418.0 13:15 13:45 base of permafrost w/ 8 bpm, 160 psi. 6/13/2017 6/13/2017 2.25 SURFAC CASING PUTB P Continue RIH with 10 3/4" Csg f/ 1,418.0 2,201.0 13:45 16:00 1,418- to 2,201' MD. 6/13/2017 6/13/2017 0.75 SURFAC CASING HOBO P M/U hanger and landing joint and set 2,201.0 2,321.0 16:00 16:45 at 2,321' MD. 6/13/2017 6/13/2017 2.50 SURFAC CEMENT CIRC P Circulated and conditioned mud. 2,321.0 2,321.0 16:45 19:15 Staged up to 8 bpm, 210 psi. Pumped 37 bbl nut plug marker and saw returns at surface 3200 stk. 6/13/2017 6/13/2017 0.50 SURFAC CEMENT RURD P Rigged up cmt line to Volant tool and 2,321.0 2,321.0 19:15 19:45 B/D TD. 6/13/2017 6/1312017 0.50 SURFAC CEMENT SFTY P Held PJSM for cmt job. SimOps, 2,321.0 2,321.0 19:45 20:15 staged pumps up through the cmt lines. P/U= 140, S/O= 130. 6/13/2017 6/13/2017 2.75 SURFAC CEMENT CMNT P Tested cmt lines to 3000 psi and 2,321.0 2,321.0 20:15 23:00 pumped 75.1 bbl of 10.5 ppg MudPush. Dropped the bottom plug and pumped 261.5 bbl of 11 ppg UghtCREAT cmt, followed by 60 bbl of class G 15.8 ppg cmt. Dropped the bottom plug and chased w/ 20 bbl of H2O. Swapped over to dg pumps and displaced with 198.2 bbl of 10.1 ppg mud at 8 bpm, 600-800 psi. bumped the plug w/ 1050 psi and held for 5 min. Checked floats and held. Full returns w/ 100 bbl of good cmt to surface were observed. "CIP @ 22:47" Page 2/30 ReportPrinted: 8/16/2017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Imre EnCTnna Oua(hd Phase Op code Ac rty Code Tune P -T -X OPeraeon (ft BDe Start e PM ErM Depth (tIK6) 6/13/2017 6/13/2017 0.25 SURFAC CEMENT CIRC P Flushed riser with black water and 2,321.0 2,321.0 23:00 23:15 functioned annular 4 times before closing in at 23:11. 6/13/2017 6/14/2017 0.75 SURFAC CEMENT RURD P Rig down Volant tool and cmt lines. 2,321.0 2,321.0 23:15 00:00 6/14/2017 6/14/2017 1.25 SURFAC CEMENT RURD P Continue to R/D casing running loojs. 2,321.0 2,321.0 00:00 01:15 P/U BHA components to rig floor and B/D lines. 6/14/2017 6/14/2017 12.75 SURFAC CEMENT PULD P PIU and rack back 118 stands of 5" 2,321.0 2,321.0 01:15 14:00 DP from pipe shed while WOC. 6/14/2017 6/14/2017 2.00 SURFAC WHDBOP NUND P Checked pressure under the annular 2,321.0 0.0 14:00 16:00 and opened same. Drained the stack and pulled landing joint. 6/14/2017 6/14/2017 2.50 SURFAC WHDBOP NUND P WD riser, flow lines, and annular. 0.0 0.0 16:00 18:30 6/14/2017 6/14/2017 1.50 SURFAC WHDBOP NUND P N/U wellhead and test hanger seals to 0.0 0.0 18:30 20:00 1 1000 psi for 10 min. 6/14/2017 6/14/2017 0.75 SURFAC WHDBOP NUND P N/U BOP slack. 0.0 0.0 20:00 20:45 1 6/14/2017 6/14/2017 1.50 SURFAC WHDBOP NUND P Installed new seals in the top pipe 0.0 0.0 20:45 22:15 rams. 6/14/2017 6/15/2017 1.75 SURFAC WHDBOP MPDA P N/U MPD equipment, damp, orbit 0.0 0.0 22:15 00:00 valve, flow lines, and flow box. 6/15/2017 6/15/2017 1.25 SURFAC WHDBOP MPDA P N/U MPD equipment, clamp, orbit 0.0 0.0 00:00 01:15 valve, flow lines, and flow box. Service lines and test hoses. 6/152017 6/15/2017 0.50 SURFAC WHDBOP RURD P Install test plug as per FMC. Fill stack 0.0 0.0 01:15 01:45 with water and purge system of air. 6/15/2017 6/15/2017 2.25 SURFAC WHDBOP MPDA T Tested MPD head to 250/1200 psi for 0.0 0.0 01:45 04:00 5 min. Had to change out adapter seals and work air out of the system. 6/15/2017 6/15/2017 1.25 SURFAC WHDBOP RURD P R/U test lines, installed trip nipple and 0.0 0.0 04:00 05:15 flooded lines. 6/152017 6/15/2017 8.25 SURFAC WHDBOP BOPE P Tested BOPE w/5"test joint. Annular 0.0 0.0 05:15 13:30 to 250/2500 psi. Rams, valves 1-14, 4" Demco, choke valves, IBOP, Kill valves, Manual IBOP, needle valve, dart valve, FOSV, and blind rams to 250/3800 psi for 10 min as per BI -M. Koomey test - FSP=2975 psi, PAC=1350 psi, 200 psi reached in 28 sec. Full PSI reached in 188 sec. N2 average= 2150 psi. Drawdown down supper choke and manual to 1100 psi. "Rig on Gen Power @ 11:20" Witness waived by Jessie Chmielowski, BI -M, 6/12/17 9:39AM. Witness waived by Brian Bixby, AOGCC 6/15/2017 6/15/2017 1.00 SURFAC WHDBOP RURD P Pulled test plug and RID testing 0.0 0.0 13:30 14:30 equipment. installed mouse hole. 6/15/2017 6/15/2017 2.25 SURFAC CEMENT BHAH P M/U 9 5/8" x 10 1/2" BHA as per SLB 0.0 815.0 14:30 16:45 to 815' MD. 6/152017 6/15/2017 1.50 SURFAC CEMENT PULD P Singled in the hole w/ 5" DP f/ 815' to 815.0 2,131.0 16:45 18:15 2,131' MD. 6/15/2017 6/15/2017 0.50 SURFAC CEMENT DHEQ P Shallow tested MWD w/550 gpm, 2,131.0 2,131.0 18:15 18:45 1520 psi. Page 3/30 Report Printed: 811 612 01 7 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan Time End Time Our (M) Phase Op Code Atlivi Code H Thne P -T -X O Partition Stan Depth (flKB) End DePtlr (mK6) 6/15/2017 6/15/2017 1.25 SURFAC CEMENT PRTS P Pressure tested 10 3/4" surface casing 2,131.0 2,131.0 18:45 20:00 to 3800 psi and held for 30 min. B/D lines and R/D test equipment. 6/15/2017 6/15/2017 1.00 SURFAC CEMENT SLPC P Slip and Cut 98' of drill line. 2,131.0 2,131.0 20:00 21:00 6/15/2017 6/15/2017 0.50 SURFAC CEMENT SVRG P Serviced TD and drawworks. 2,131.0 2,131.0 21:00 21:30 6/1512017 6116/2017 2.50 SURFAC CEMENT COCFP Calibrated block height and reamed 2,131.0 2,232.0 21:30 00:00 1 down f/ 2,131' to 2,232' MD. 6/16/2017 6/16/2017 1.50 SURFAC CEMENT DRLG P Continue drilling out shoe track from 2,232.0 2,331.0 00:00 01:30 2300' MD to 2320' MD, 450-550 gpm, 1060-1560 psi, 40-60 rpm, 6.1 k ft -lbs Tq. Tag shoe and drillout @ 2316' MD to 2318' MD. Drill cement from 2318' MD to 2331' MD. 6/16/2017 6/16/2017 0.50 SURFAC CEMENT DDRL P Drill 20' of new formation from 2331' 2,331.0 2,351.0 01:30 02:00 MD to 2351' MD, ADT= 0.34 hr. SIMOPS- displace well to 9.6 ppg LSND mud. 6/16/2017 6/16/2017 1.00 SURFAC CEMENT CIRC P Circulate BU and condition mud @ 2,351.0 2,226.0 02:00 03:00 570 gpm for even 9.6 ppg LSND. 1200 psi, P/U= 131 k, S/O= 115k, ROT= 126k. Pull through shoe with reduced pump rate- no overpull seen. 6/16/2017 6/16/2017 0.50 SURFAC CEMENT RURD P Flow check well- static. Rig up test 2,226.0 2,226.0 03:00 03:30 equipment for FIT test. Pressure lest lines to 1200 psi (Good). 6/16/2017 6/16/2017 0.50 SURFAC CEMENT FIT P Perform FIT to 18.1 ppg EMW with 9.6 2,226.0 2,226.0 03:30 04:00 ppg LSND mud. Pumped 1.3 bbl total to 960 psi final pressure. Rig down test equipment. Blow down lines. 6/16/2017 6/16/2017 0.50 INTRMI DRILL REAM P RIH with 5" ddllpipe from 2226' MD to 2,226.0 2,322.0 04:00 04:30 2322' MD. Wash and ream stand down @ 550 gpm, 1180 psi, 50 rpm, 3.5k To, ROT= 126k. 6/16/2017 6/16/2017 1.50 INTRMI DRILL DDRL P Directional drill from 2322' MD to 2,322.0 2,448.0 04:30 06:00 2448' MD with 715 gpm, 1860 psi, 70 rpm, 4.6k TO. 6/16/2017 6/16/2017 0.75 INTRMI DRILL CIRC P Pick up off bottom to 2445' MD. Obtain 2,448.0 2,448.0 06:00 06:45 parameters prior to activating 10-1/2" Rhino undereamer: 700 gpm, 1800 psi, P/U= 131 k, S/O= 118 k, ROT= 126 k, To= 2.8 k, TRPM= 2936. Break connection and drop 1.25" OD activation ball. Pick up to 2435' MD. Pump ball down @ 150 gpm, 130 psi. Once ball on seat @ 405 stk, increase rate to 700 gpm, 1370 psi, TRPM= 2304. Pull test against casing shoe with 1 Ok over P/U- postive confirmation reamer open. Ream back down to 2448' MD to open hole to 10- 1/2" at reduced drilling rate. 6/16/2017 6/16/2017 3.75 INTRM1 DRILL DDRL P Directional drill from 2448' MD to 2,448.0 2,980.0 06:45 10:30 2980' MD. 800gpm, 1850 psi, ECD= 10.59 ppg, P/U= 138k, S/O= 118k, ROT= 125k, 180 rpm, Tq on/off-- n/off=3.5k 3.5k/ 5.5k Page 4130 Report Printed: 8/16/2017 Summary (with Timelog Depths) &L�Operations CD5-314X ... Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Spirt Time Ertl Time Oyu (hr) Phew Op Gone nceviry Cotle Time P -T -x Dpem"On son Depth (RKB) _. EM Depth (MB) 6/16/2017 6/16/2017 0.50 INTRMI DRILL SVRG P Service drawworks and IBOP. 2,980.0 2,980.0 10:30 11:00 6/16/2017 6/16/2017 1.00 INTRMI DRILL DDRL P Directional drill from 2980' MD to 2,980.0 3,072.0 11:00 12:00 3072' MD 12697' TVD. ADT= 4.85 hr, 800gpm, 1850 psi, ECD= 10.59 ppg, P/U= 138k, S/O= 118k, ROT= 125k, 180 rpm, Tq on/off= 5.5k / 3.5k 6/16/2017 6/17/2017 12.00 INTRMI DRILL DDRL P Directional drill from 3072' MD to 3,072.0 4,669.0 12:00 00:00 4669' MD / 3381' TVD. Hole attempting to pack -off at 4360' MO with 350 psi increase in pump pressure. Work string to clear; increase frequency of hi-visc and weighted sweeps. ADT= 8.55hr, 800gpm, 2460 psi, ECD= 11.07 ppg, P/U= 142k, S/O= 113k, ROT= 127k, 180 rpm, Tq on/off= 4k / 7k Note: Rig evacuation drill @ 14:35hr 6/1712017 6/17/2017 12.00 INTRMI DRILL DDRL P Directional drill 9-7/8" x 10-1/2" 4,669.0 6,266.0 00:00 12:00 intermediate hole from 4669' MD to 6266' MD / 4070' TVD. ADT= 9.11 hr, 800gpm, 2810 psi, ECD= 11.17 ppg, P/U= 170k, S/0= 130k, ROT= 142k, 180 rpm, Tq on/off= 12k / 7.5k Note: Rig off generators/ back on Hi Line power @ 11:30 6/17/2017 6/18/2017 12.00 INTRMI DRILL DDRL P Directional drill 9-7/8" x 10-112" 6,266.0 7,965.0 12:00 00:00 intermediate hole from 6266' MD to 7965' MD / 4807' TVD. Adjust parameters to mitigate stick- slip start at 7400' MD. Increase HydraSpeed lube concentration from 0.5% to 1.25%. ADT= 8.87 hr, 800gpm, 2400 psi, ECD= 11.02 ppg, P/U= 192k, S/O= 131k, ROT= 154k, 150-180 rpm, Tq onloff= 16.5k / 9.5k 6/18/2017 6/18/2017 12.00 INTRMI DRILL DDRL P Directional drill 9-7/8" x 10-1/2" 7,965.0 9,751.0 00:00 12:00 intermediate hole from 7965' MD to 9751' MD 15584' TVD. ADT= 8.99 hr, 800gpm, 2870 psi, ECD= 10.88 ppg, P/U= 205k, SIO= 147k, ROT= 172k, 180 rpm, Tq on/off= 18k 112k ' 6/18/2017 6/19/2017 12.00 INTRMI DRILL DDRL P Directional drill 9-7/8"x 10-1/2" 9,751.0 11,632.0 12:00 00:00 intermediate hole from 9751' MD to 11632' MD / 6399' TVD. ADT= 9.09 hr, 800gpm, 3010 psi, ECD= 11.20 ppg, P/U= 235k, S/O= 152k, ROT= 183k, 180 rpm, Tq on/off= 23k / 12k 6/19/2017 6/19/2017 7.75 INTRMI DRILL DDRL P Directional drill 9-7/8"x10-1/2" 11,632.0 12,688.0 00:00 07:45 intermediate hole from 11632' MD to 12688' MD / 6844' TVD. Page 5/30 Report Printed: 811612017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Sint Time End Time Dur(ho Phase op Code Activity Code Time P -T -X Operation Sbd Depth (axe) Eml Depth (ttl(a) 6/19/2017 6/19/2017 1.00 INTRMI DRILL CIRC P CBU x1.5, finishing first circ of black 12,688.0 12,606.0 07:45 08:45 product spike and wt to 10.1 ppg. 800 gpm, 3350-3460 psi, 180-170 rpm, 17.5-15K tq, Observe well static. PUW 250k, SOW 165k, Rot 195k 6/19/2017 6/19/2017 0.50 INTRMI DRILL MPDA P Pulled trip nipple and installed RCD 12,606.0 12,626.0 08:45 09:15 bearing. 6/19/2017 6/19/2017 0.25 INTRMI DRILL MPDA 5 Obtain SPR's, Brk in MDP bearing w/ 12,626.0 12,688.0 09:15 09:30 50-150 RPM 6/19/2017 6/19/2017 2.50 INTRMI DRILL DDRL P Directional drill 9-7/8" x 10-1/2" 12,688.0 12,982.0 09:30 12:00 intermediate hole from 12668' MD to 12982' MD / 6985' TVD. Maintain 11.5 ppg EMW on connections via MPD chokes. ADT= 7.71 hr, 800gpm, 3720 psi, ECD= 11.49 ppg, P/U= 275k, S/0==' 155k, ROT= 200k, 150 rpm, Tq on/off= 28.5k / 24k 6/19/2017 6/20/2017 12.00 INTRMI DRILL DDRL P Directional drill 9-7/8"x10-1/2" 12,982.0 13,988.0 12:00 00:00 intermediate hole from 12982' MD to 13988' MD / 7312' TVD. Maintain 11.5 ppg EMW on connections via MPD chokes. ADT= 8.31 hr, 800gpm, 3950 psi, ECD= 11.50 ppg, P/U= 295k, S/0= 145k, ROT= 191k, 150 rpm, Tq on/off= 26k / 19k 6/20/2017 6/20/2017 12.00 INTRMI DRILL DDRL P Directional drill 9-7/6"x10-1/2" 13,988.0 14,964.0 00:00 12:00 intermediate hole from 13,988' MD to 14,964' MD / 7312' ND. Maintain 11.5 ppg EMW on connections via MPD chokes. ADT= 7.48 hr, 785 gpm, 3750 psi, ECD= 11.53 ppg, P/U= 315k, S/0=144k, ROT= 1851k, 150 rpm, Tq on/off= 26.5k / 20k 6/20/2017 620/2017 1.00 INTRMI DRILL DDRL P Continue drilling to TO @ 14,986' MD, 14,964.0 14,986.0 12:00 13:00 7,414' TVD. ADT= .19 hrs. 6/202017 6/20/2017 2.75 INTRMI CASING CIRC P Obtain on bottom survey, circulate 2 14,986.0 14,986.0 13:00 15:45 bottoms up from 14,986' MD to 14,933' MD @ 800 gpm, 4000 psi, 150 rpm, 18-21k.Tq. Maintaining 11.5 ppg ECD with MPD. 6/20/2017 6/20/2017 0.75 INTRMI CASING OW—FF P Perform formation fingerprint while 14,986.0 14,986.0 15:45 16:30 rotating @ 4 rpm, 19.5k Tq. Shut in chokes, build to 87 psi. Bleed off pressure, re -Gose choke and build to 80 psi in ten minutes. 6/20/2017 6/20/2017 2.50 INTRMI CASING CIRC P Circulate 2 bottoms up @ 800 gpm, 14,986.0 14,986.0 16:30 19:00 3820 psi, 150 rpm, 17-19k Tq. Maintain 11.5 ppg ECD with MPD. 6/20/2017 6/20/2017 0.25 TNTRMI BKRM T Observe packoff @ 14,856' while 14,986.0 14,986.0 19:00 19:15 backreaming stand up. Worked pipe free with downweight and torque. Regain circulation and work area. Page 6130 Report Printed: 8/16/2017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time Ertl Time Dur (hr) Phase Do Code Activity Code Torre P-T-Xs��� Opel (flK8 End OBpN (ftl(a) 6/20/2017 6/20/2017 2.25 INTRMI CASING CIRC P Continue circulation and weight up 14,986.0 14,986.0 19:15 21:30 mud system to 10.6 ppg, 800-710 gpm, 3820-3330 psi, 150 rpm, 19.5- 23k Tq. Maintain 11.5 to 11.8 ppg with MPD. 6/2012017 6/20/2017 1.25 INTRMI CASING CIRC P Close under reamer. Obtain baseline 14,986.0 14,838.0 21:30 22:45 parameters @ 690 gpm, pump pressure=3070 psi, TRPM=2500, Shut down, drop 1.625" Torlon closing ball, ball on seat @ 2096 stks, observed shear @ 2220 psi. Pump pressure=3480. TRPM=2773. Good indication reamer closed. 6/20/2017 6/21/2017 1.25 INTRMI CASING CIRC P Circulate and increase mud weight 14,838.0 14,986.0 22:45 00:00 from 10.6 ppg to 10.8 ppg, reciprocating from 14,838' MD to 14,744' MD. 690-800 rpm, 3480-3980 psi, 150 rpm, 19.5-24k Tq, ECD=11.6- 11.8 ppg EMW. 6/21/2017 6/21/2017 1.25 INTRM1 CASING CIRC P Continue weight up to 10.8 ppg, 675 14,986.0 14,838.0 00:00 01:15 gpm, 3280 psi, 150 rpm, 19K tq, Obtain SPR's and blow down TO 6/21/2017 6/21/2017 0.50 INTRMI CASING OWFF P Observe well static, rotate 5 rpm, 17K 14,838.0 14,838.0 01:15 01:45 tq 6/21/2017 6/21/2017 0.50 INTRMI CASING SMPD P Attempt to SOOH, from 14,838'to 14,838.0 14,722.0 01:45 02:15 14,722', 35K overpull at 14,724', 2X's, 14,722, 3X's, P/U=350k, S/0=120k. Able to break over down without extra drag. Decision made to BROOH 6/21/2017 6/21/2017 9.75 INTRMI CASING BKRM P BROOH from 14,722'to 12,293', 650 14,722.0 12,293.0 02:15 12:00 gpm, 3260-3020 psi, 150-120 rpm, 21- _.—_ _.__.. __ _ __._ 16K tq,. w/ MPDE.holding325 psi AP - on connections. 6/21/2017 6/21/2017 3.50 INTRMI CASING CIRC P Circulate 3.5 bottoms up @ 690 gpm, 12,293.0 12,293.0 12:00 15:30 3250 psi, 120-150 rpm, 15-18k Tq. 6/21/2017 6/21/2017 5.25 INTRMI CASING SMPD P Line up MPD and strip out of hole from 12,293.0 7,118.0 15:30 20:45 12,293' MD to 6,974' MD, holding 380- 350 psi annular pressure pulling and 260 psi in slips to maintain ECD @ 11.5 ppg. Tight spots at 11,905', 9,860', 7,105' and 6,995', able to work through. Tight spot @ 6,974', attempted to pull through 35k over 3X with no movement, able to break over down. RBIH one stand to 7,118' MD. 6/21/2017 6/21/2017 0.75 INTRMI CASING CIRC P Circulate bottoms up @ 690 gpm, 7,118.0 7,118.0 20:45 21:30 2670 psi, 120 rpm, 10k. Heaviest mud out 11.0 ppg. 6/21/2017 6/22/2017 2.50 INTRMI CASING BKRM P Backream out of hole from 7,118' MD 7,118.0 6,261.0 21:30 00:00 to 6,261' MD @ 690 gpm, 2670-2400 psi, 120 rpm 6-12k Tq. Varying pulling speed to maintain 11.6-11.8 ppg ECD. 6/22/2017 6/2212017 1.00 INTRMI CASING BKRM P Backream out of hole from 6,261' MD 6,261.0 5,990.0 00:00 01:00 to 5,990' MD @ 690 gpm, 2400 psi, 120 rpm, 9-12k Tq holding 240 psi annular pressure with MPD in slips. P/U=160k, S10=130k, ROT=140k. Page 7130 Report Printed: 8/16/2017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Starl Time EM Time our (to) PheaeSt Op Code AcpvM1y Code lime P-T-X art Depth (%K13) Er Depth (W) 6/22/2017 6/22/2017 0.25 INTRMI CASING OWFF P Monitor well for Flow, static. 5,990.0 5,990.0 01:00 01:15 6/22/2017 6/22/2017 0.25 INTRMI CASING MPDA P Pull MPD element and strip from 5,990.0 5,990.0 01:15 01:30 stand. Install trip nipple. Fill and leak check good. Flow check static, sligbt drop. 6/22/2017 6/22/2017 7.00 INTRMI CASING BKRM P Continue backreaming out of hole 5,990.0 2,603.0 01:30 08:30 from 5,990' MD to 2,603' MD @ 690 gpm, 2350-2400 psi, 150 rpm, 8k-3k Tq. P/U=130k, S/0=120k, ROT=125k. 6/22/2017 6122/2017 1.00 INTRMI CASING CIRC P Circulate and condition, pump 39 bbl 2,603.0 2,414.0 08:30 09:30 12.8 ppg Nut Plug sweep @ 635-690 gpm, 1980-2280 psi, 150-180 rpm, 2.5 -3k Tq. Circulate total 4.5 bottoms up, rack back 2 stands to 2,414' MD. 6122/2017 6/22/2017 1.00 INTRMI CASING BKRM T Continue baGkream from 2,414' MD to 2,414.0 2,318.0 09:30 10:30 2,318' MD, 690 gpm, 2280 psi, 60 rpm, 1.5k Tit. No rotary pulling bit into shoe, slight packing off as bit entered shoe. into casing 6/22/2017 6122/2017 1.25 INTRMI CASING BKRM T Continue backream from 2,318' MD to 2,318.0 2,037.0 10:30 11:45 2,037' MD, 690 gpm, 2250 psi, 180 rpm, 2.5k Tq. Pump 2 ea 12.8 ppg Nut Plug sweeps around while backreaming. Large clay and siltstone chunks observed at shakers. 6/22/2017 6/22/2017 0.25 INTRMI CASING OWFF P Observe well for flow, static. 2,037.0 2,037.0 11:45 12:00 6/22/2017 6/22/2017 0.75 INTRMI CASING TRIP P POOH on elevators from 2,037' MD to 2,037.0 1,565.0 12:00 12:45 1,565' MD. Improper hole fill, flow check static. ' 6/22/2017 6/22/2017 1.25 INTRMI CASING BKRM T Backream out of hole from 1,565' MD 1,565.0 815.0 12:45 14:00 to 815' MD ® 690 gpm, 2170-1970 psi, 90 rpm, 1-2k Tq. 6/22/2017 6/2212017 0.25 INTRMI CASING OWFF P Flow check, slight flow taper to static 815.0 815.0 14:00 14:15 in 9 minutes. 6/22/2017 6/22/2017 1.75 INTRMI CASING BKRM T Backream out of hole from 815' MD to 815.0 173.0 14:15 16:00 173' MD, lay down HWDP stand with jars, bumper sub not closing. 6/22/2017 6122/2017 1.25 INTRMI CASING BHAH P Flow check static, PJSM and lay down 173.0 0.0 16:00 17:15 BHA #2 per DD/MWD. 6122/2017 6/22/2017 0.50 INTRMI CASING BHAH P Clean and clear rig floor of BHA 0.0 0.0 17:15 1745 components. 6/22/2017 6/22/2017 0.75 INTRMI WHDBOP WWWH P WU stand with stack washer, flush 0.0 0.0 17:45 18:30 stack. Function rams, blow down top drive. 6/22/2017 6/22/2017 1.25 INTRMI WHDBOP RURD P M/U testing sub to top drive, change 0.0 0.0 18:30 19:45 1 out upper rams to 7-5/8" SBR's. 6/22/2017 6/22/2017 0.75 INTRMI WHDBOP RUR- P FMC pull wear ring, pulled 15k on 0.0 0.0 19:45 20:30 elevators no movement. Break testing sub from top drive, WU top drive and pull 38k to free wear ing. 6/22/2017 6/22/2017 0.75 INTRM1 WHDBOP RURD P Set upper test plug on 5" test joint, 0.0 0.0 20:30 21:15 R/U to test BOPE. Fill and bleed air from lines. Page 8/30 Report Printed: 8/16/2017 Operations Summary (with Timelog Depths) 15 , CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log start Time End Tune Our (hr) Phase OD Code Ad gy Cade Time P-T-X O pendinn Start �Dm (n ae End Depth (flKB) 6!22/2017 6/23/2017 2.75 INTRMI WHDBOP BOPE P Test BOPE per BLM requirement, 0.0 0.0 21:15 00:00 witness waived by BLM rep Mutasim Elganzoory 6/22 @ 16:35. AOGCC Chuck Scheve waived witness 6/22 @ 16:38. Tested with 5" TJ annular to 250/2500 psi, Lower 3-1/2'x6" VBR's to 250/3800 psi, 10 minutes per test. Change to 7-5/8" test joint, test annular 250/2500 psi, upper 7-518" SBR's to 250/3800 psi 10 minutes each charted. 6/23/2017 6/23/2017 3.00 INTRMI WHDBOP BOPE P Continue Test BOPE per BLM 0.0 0.0 00:00 03:00 requirement. 7-518" test joint, test 7- 518" SBR's, Choke valves #1-#14, needle valve, Auto/Man IBOP's, FOSV/Dart, 4" Demco kill, Man choke and kill on stack to 250/3800 psi 10 minutes each charted. Witness waived by BLM rep Mutasim Elganzoory 6/22 @ 16:35. AOGCC Chuck Behave waived witness 6/22 @ 16:38. 6/23/2017 6/23/2017 0.25 INTRMI WHDBOP BOPE P Accumulator test: Initial System 0.0 0.0 03:00 03:15 Pressure 3,000 psi, System pressure after function 1,525 psi N2 precharge in accumulator bottles 1,000psi First 200psi in 31 seconds with single electric pump Final 3,000psi 143 ' seconds with electric pump and 3 air pumps., N2 Emergency Back-up Bottles 4@2200 psi. Function remote panel boiler room. 6/23/2017 6/23/2017 0.75 INTRMI WHDBOP BOPE P Test blind rams t/ 25013800 psi f/ 10 0.0 0.0 03:15 04:00 min, tested gas alarms, flow meter & PVT's, monitored wellbore under test plug while testing, lost 4 bbis mud while testing. 6/23/2017 6/2312017 0.50 INTRMI WHDBOP RURD P FMC set 10.375" ID wear ring 0.0 O.0 04:00 04:30 (SIMOPS-Blow dwn lines & RD test equip) 6/23/2017 6/23/2017 0.50 INTRMI CASING RURD P Rig up Volant CRT, bail extensions, 7- 0.0 0.0 04:30 05:00 5/8" elevators and 350T spider slips. P/U shoe joint. 6/23/2017 6/23/2017 7.00 INTRMI CASING PUTS P PJSM, P/U and RIH with 7-5/8" casing 0.0 4,591.0 05:00 12:00 per detail. M/U shoe, Baker Lok joints and float collar. Pump through shoe track and check Floats- good. P/U and RIH with 7-5/8" 29.7# H563 casing to 4,591' MD, 114 jts in hole. 6/23/2017 6/23/2017 2.00 INTRMI CASING PUTB P Continue P/U and RIH with 7-5/8" 4,591.0 6,031.0 12:00 14:00 casing from 4,591' MD to 6,031' MD. 6/23/2017 62312017 1.00 INTRMI CASING CIRC P Establish circulation, stage rate up 61031.0 6,031.0 14:00 15:00 from 2 to 8 bpm, 170 psi. P/U=165k, S/0=140k. Circulate bottoms up, highest mud weight out 10.9+ ppg. 6/232017 623/2017 5.50 INTRMI CASING PUTB P Continue P/U and RIH with 7-5/8" 6,031.0 9,478.0 15:00 20:30 I casing from 6,031' MD to 9,478' MD. S/0=140k. Page 9/30 ReportPrinted: 8116/2017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log elan Time EM Time our (hr) phase op Code Activity Code Time P -T -X Operant Sfart Depth (9,4 EM DepM9,4 (MS) 6/23/2017 6/23/2077 2.50 INTRMI CASING CIRC P Planned circulate and condition, 9,478.0 9,478.0 20:30 23:00 reciprocate pipe 20' strokes. Break circulation @ 1 bpm, 260 psi, stage up to 6 bpm 340 psi, did not exceed 6 bpm due heavy mud in annulus. After 170 bbl pumped, performed 275 bbl mud dilution, dumping returns, saved for contingency. Consistant 11.1 ppg out, brief peak of 11.4 ppg at bottoms up. Circulate total 1.25 bottoms up until MW out 10.9 ppg decreasing. P/U=225k, S/0=160k. 6/23/2017 6/24/2017 1.00 INTRMI CASING PUTS P Continue P/U and RIH with 7-5/8" 9,478.0 10,035.0 23:00 00:00 casing from 9,478' MD to 10,035' MD. S/0=155k, 250 joints in the hole. 6/24/2017 6/24/2017 9.00 INTRMI CASING PUTB P Continue P/U and RIH with 7-5/8" 10,035.0 14,215.0 00:00 09:00 casing from 10,035' MD to 14,215' MD. Losing SOW wt f/ 170K to 75K. 6/24/2017 6/24/2017 3.00 INTRMI CASING PUTS P Continue run Csg, slow going thru • 14,215.0 14,315.0 09:00 12:00 Kalubik, 100-10'/hr. Pulling string in tension to 300K after string stops at 75K to get a little more. 6/24/2017 6/24/2017 0.50 INTRMI CASING PUTS P Continue working casing dawn to 14,315.0 14,328.0 12:00 12:30 14,328' MD lost all SOW Progress diminished to none, decision made to attempt to circulate/ lay down joints. 6/24/2017 6/24/2017 2.50 INTRMI CASING CIRC T Attempt to circulate, stage up pump 14,328.0 14,328.0 12:30 15:00 pressure to 1050 psi while attempt to reciprocate. Work pipe from 65K to 475K, applying pump pressure with no returns 300-1100 psi. 6/24/2017 6/24/2017 2.50 INTRMI CASING PULL T Decision to pull and lay down casing 14,328.0 14,242.0 15:00 17:30 to regain returns. Pull from 14,328' to 14,242' MD with 300 psi on string, string break over @ 475k. Making headway out of hole, none down, no circulation, worked 2 As casing out to 14,242' with 475K to 425K PUW 6/24/2017 6/25/2017 6.50 INTRMI CASING CIRC T Establish circulation @.5 bpm, 600 14,242.0 14,242.0 17:30 00:00 psi. Continue to circulate and stage pumps up to 5.5 bpm, 680 psi, 34% return flow. (Repeated packoffs and restart of circulation in the process) Attemped to reach 6 bpm and packed off. No reciprocation while circulating due packing off, but move string 5-10 feet every 10 minutes. Pipe free, P/U=325k, S/0=155k. Breaking over up @ 355-375k, down @ 85- 90k.Heaviest mud weight out 11.5 ppg. Bleed off, work string and repeat stage up as hole will allow to 2.5 bpm. Circulated total 7700 strokes, 1.1 bottoms up. 10.8+ in, 11.0 ppg out. 6/25/2017 6/25/2017 1.00 INTRMI CASING WASH Wash down casing from 14,242' MD to 14,242.0 14,305.0 00:00 01:00 14,305' MD @ 3 bpm, 390430 psi. IT Packed off to 800 psi. P/U and break over w/450k. Page 110130 ReportPrinted: 8/16/2017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) pFmse Op Code Ac ty Code Tune P-T-xStart Opare6on Dept htK6) End Depth (WS) 6/25/2017 6/25/2017 11.00 INTRMI CASING WASH T Continue washing/working casing 14,305.0 14,371.0 01:00 12:00 down from 14,305' MD to 14,371' MD. Reduce pump rate to .5 bpm, 280-450 psi. Any attempt to increase rate results in packing off. Free string weight P/U=360k, S/0=1 55k. Work casing up to 450k to break over, and slack off to 75k making slow headway. Put 1/2 tum in casing and worked down torque to get through hard spot @ 14,310'. Again put in a couple 1/4 turns @ 14,365' MD, no significant gain. 6/25/2017 6/26/2017 12.00 INTRMI CASING WASH T Continue to wash and work casing in 14,371.0 14,480.0 12:00 00:00 hole @ .5 bpm from 14,371' MD to. 14,480' MD. 'Clean hole' 490 psi, up to 800 psi. Vary pump speed and pipe movement to avoid packoff. P/U=340- 355k, S/0=1 55k, stacking weight to 70k making 1-2' at a time. Breaking over up @ 375430k, down 130k. Removed Volant mud saver @ 14,435'to ensure correct casing/formation presssure. No change. 6/26/2017 6/26/2017 12.00 INTRMI CASING WASH T Continue washing casing down 14,480.0 14,526.0 00:00 12:00 through Kalubik shale from 14,480' MD to 14,526' MD. Wash down @.5 to 1.3 bpm depending on conditions, clean pump pressure470-540 psi, minor packing off, max psi 910 after connection @ 14,490'. Taking 1-2' bites when able, then P/U and break over @ 375420k. (Free pipe U/D= 360k/160k. Work string down to 70- 75k hookload. Put tum in pipe and work down 10k Tq, no noticeable effects. Observe heaviest mud weight out 11.5 ppg, mostly 11+to 11.2 ppg. Total pumped 640 bbl for tour. 6/26/2017 6/27/2017 12.00 INTRMI CASING WASH T Continue washing casing down 14,526.0 14,600.0 12:00 00:00 through Kalubik shale from 14,526" MD to 14,600' MD. Wash down @.5 to 1.3 bpm depending on conditions, clean pump pressure480 psi @.5 bpm, 580 psi @ 1.3 bpm. minor packing off at higher rates. PIU and break over @ 375420k. (Free pipe U/D= 350k1150k. Work string down to 70-75k hookload. Observe heaviest mud weight out 11.4 ppg, mostly 11+ to 11.2 ppg. Total pumped 520 bbl for tour. Page 11/30 Report Printed: 811612017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time our (M) Phase op code AWWy CoteTime P -T -X Qperahon Stan Depth (we) End DOM MiB) 6/27/2017 6/27/2017 12.00 INTRMI CASING WASH T Continue washing casing down 14,600.0 14,639.0 00:00 12:00 through Kalubik shale from 14,600' MD to 14,639' MD @ .5-4 bpm, 460- 560 psi. Some packing off, able to recover quickly. Put turn in pipe and work down 12.3k per wrap several times, 10.7k 1/2 wrap. Came to stopping point at 14,605' MD. Pull joint up high past breakover @ 385k, pgll into second breakover @ 450k. Work through until gone 385k several times. Come back down and begin increasing rate to 6-7 bpm to clean shale from centalizers, some packing off usually on the top of stroke, able to recover quickly. Observe small shale bits on shakers @ fat bottoms up, increase to significant amounts. Started taking small bites on downstroke making 6" to 12" per. P/U and break over @ 375420k. (Free pipe UID= 360k/1 63k. Work string down to 75k hookload. Observe heaviest mud weight out 11.3 ppg, reducing to 10.8 ppg inlout after two bottoms up at higher rates, added fresh Lube 776. Total pumped 2700 bbl for tour. 6/27/2017 6/28/2017 12.00 INTRMI CASING WASH T Continue wash and work casing in 14,639.0 14,672.0 12:00 00:00 hole from 14,639' MD to 14,672' MD. Pumping @ 7 bpm, 420 psi taking small bites to 14,651'. Total of three bottoms up @ 6-7 bpm. Packed off @ 7 bpm, regain circulation @ 2.5 bpm, attempt to increase resulted in packoff. Unable to sustain circulation past 1.5 bpm, continue working in hole, traveling down with 125k. P/U=355k, 8I0=120k, MW inlout 10.8 ppg. Total pumped 1750 bbl for tour. Formation losses for day= 30 bbl, cumulative 83 bbl running casing. 6/28/2017 6/28/2017 12.00 INTRMI CASING WASH T Continue wash and work casing in 14,672.0 14,698.0 00:00 12:00 hole from 14,672' MD to 14,698' MD. Pumping @ 2.5 bpm, reducing to .5 bpm. Packing off attempting to increase rate, circulating pressures 250400 psi. Free pipe P/U=360k, S/0=170k with breakover varying from 365k to 410k up and 150k -130k down depending on activity. Pulling 10-13 feet past breakover, pull up to 475k to free centralizers. MW infout 10.8/10.8+ ppg, Total pumped 635 bbl for tour. Page 12130 Report Printed: 8/16120171 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time Ti EN me Our (hr) Phase Cp Code Activity Code Time P-T-X operetion 3m S)ptlt End Oepm (fe(9) 6/28/2017 6!29/2017 12.00 INTRMI CASING WASH T Continue wash and work casing in 14,698.0 14,745.0 12:00 00:00 hole from 14,698' MD to 14,745' MD. Pumping @ .5 bpm, 300-380 psi ' taking up to 1-2' bites to 14,727'. Traveling down with 50k hook load, pressure increasing to 450-500 psi steady and not making footage. Picked up past intial breakover @ 375k and drag centralizers to dear, made three passes 440k, 410k, 375k. Clean up by pumping 2-3 bpm on upstroke, .5 bpm down until able to sustain .5 bpm 320 psi and continue making l' bites. After connection @ 14,738', able to increase and sustain pump rate of 2 bpm 460-500 psi. Free pipe P/U=360k, S/0=170k, MW in/out 10.8/10.8+ ppg. Total pumped 320 bbl for tour. Formation losses for day= 28 bbl, cumulative 111 bbl running casing 6/29/2017 6/29/2017 12.00 INTRMI CASING WASH T Continue wash and work casing in 14,745.0 14,795.0 00:00 12:00 hole from 14,745' MD to 14,796' MD. Pumping @ 2.0 bpm reducing to .5 bpm. Packing off attempting to increase rate, circulating pressures 280-520 psi. Mud weight in/out 10.8/11.0-11.3 ppg. Free pipe P/U=365k, S/0=170k with breakover varying from 375k to 410k up and 150k-130k down depending on activity. When ROP slows, periodically pulling 10-13 feet past breakover, pull up to 475k to free centralizers then attempt to dean up. Total pumped 408 bbl for tour. 6/29/2017 6/29/2017 1.00 INTRMI CASING WASH T Continue washing casing in hole from 14,795.0 14,801.0 12:00 13:00 14,795' MD to 14,801' MD @ 1-1.5 bpm, 400-550 psi. 6/29/2017 6/29/2017 7.00 INTRMI CASING PUTB T Slack off to 50k without pumps, 14,801.0 14,860.0 13:00 20:00 pumping 200 psi on the upstroke for swab only. Able to make headway from 14,801' MD to 14,860' MD. Begin bleeding off pressure on downstroke to eliminate hydraulic effect. From 14,827'to 14,858' able to RIH with 60- 70k After connection @ 14,858', forward movement all but stopped. 6/29/2017 6/29/2017 3.25 INTRMI CASING CIRC T Attempt to regain circulation @ .1 -.3 14,860.0 14,860.0 20:00 23:15 bpm while moving pipe with consistant packing off. Position string in neutral position @ 14,840', P/U=350k, S/0=155k. Break circulation @.2 bpm, 530-560 psi 15 min, .3 bpm 30 min 535 psi. .4 bpm 600-660 40 min, 5 bpm 650-680 fluctuating for 10 min, .6 bpm climbed to 770 psi in 10 min packing off. Pumped total 65 bbl. - Slack off to 50k no breakover, P/U to 475k and break over. Page 13/30 Report Printed: 8/16/2017 Operations Summary (with Timelog Depths) CD5-314X 16 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Lag Stmt Time End Time our (hr) Phase Op Coe Activity Code Imre P-T-x Operatimi StefixaPM End eph ) 6/29/2017 6/30/2017 0.75 INTRMI CASING WASH T Slack off to bottom while attempting 14,860.0 14,871.0 23:15 00:00 circulation @ .1-.3 bpm, tag 14,860' with 80k hookload. Continue making hole to 14,871' MD pumping on upstroke for swab, and slacking off to 50k. Formation losses for day= 30 bbl, cumulative 141 bbl running casing 6/30/2017 6/30/2017 1.00 INTRMI CASING PUTS T Continue RIH with 7-5/8" casing from 14,871.0 14,938.0 00:00 01:00 14,871' to 14,936' MD. Break over string while pumping @ 385k, slack off to 60k and progress to 14,881', observe string working in hole @ 70k, increasing to 140k slack off weight. 6/30/2017 6/30/2017 0.50 INTRMI CASING HOSO P Make up hanger and landing joint, RIH 14,938.0 14,976.0 01:00 01:30 and land casing @ 14,976' MD with I I5 slack off weight. Total 372 joints in the hole, 24 Centek centralizers, 27 straight blades. 6/30/2017 6/30/2017 10.50 INTRMI CEMENT CIRC T Attempt to establish circulation @ .5 14,976.0 14,976.0 01:30 12:00 bpm, packing off up to 800 psi limit. Bleed off and repeat, working string from hanger up to breakover 375k, and up to 475k at times trying to gain circulation. Establish circulation @ .2 bpm 760 psi stablized. Hold @ .2 untill pressure drops —100 psi and increase to .3, work up to 1.6 bpm 550 psi, observing multiple pressure spikes. Working string up to breakover wt and back to hanger. P/U=350-375k, S/0=115k. 6/30/2017 7/1/2017 12.00 INTRMI CEMENT CIRC T Continue staging up pump rate from 14,976.0 14,976.0 12:00 00:00 1.6 bpm 550 psi to 2.5 bpm 410 psi, Observe several packoff attempts/ pressure cycles, max sustained rate 3 bpm 430 psi for 30 min. Reciprocate string off hanger to breakover weight 350-375k, SIO 150k to hanger and land while circulating. Mud weight out 11.2 ppg. peaking 11.3 ppg @ bottoms up, gas units peaked 2600 @ bottoms up. Total bbl pumped since landed 1725 bbl. Observing good cutting returns for 2 bpm, dark sand/ pulverized shale/ clay mixture. Daily mud lost to formation 28 bbl, cumulative 169 bbl running casing. SIMOPS- UD 56 stands 5" DP with mousehole and tuggers. 7/1/2017 7/1/2017 12.00 INTRMI CEMENT CIRC T Continue to stage up pumps to max 14,976.0 14,976.0 00:00 12:00 4.7 bpm sustained for 10 minutes, pressure up. Bleed off and restart, able to stage back up to 3.4, pressure up again. Continue working pipe to breakover weight, observe string not moving. Attempt to breakover string @ 475k, little movement. Continue working string to 375k, down to hanger. SIMOPS- UD 67 stands 5" DP via mousehole and tuggers. Page 14130 ReportPrinted: 6/16/2017 Operations Summary (with Timelog Depths) AIL CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stars Time End Tuna Our (hr) Phase Op Code A Iy COC. Time P -T -X Opetahm Start Depth (fiKB) EM Depen (td(a) 7/1/2017 7/1/2017 4.00 INTRMI CEMENT CIRC T Continue to work string while 14,976.0 14,976.0 12:00 16:00 attempting to increase circulating rate from 3 bpm, 530-800 psi. Pulling 350- 425k, slack off 120-50k. SIMOPS- UD remaining 20 stands 5" DP. 7/1/2017 7/1/2017 4.50 INTRMI CEMENT CIRC T Land hanger, stage and work pump 14,976.0 14,976.0 16:00 20:30 rate up from 1.5 bpm 380 psi to 4 bpm, 475 psi, able to sustain 4 bpm for up to -30 minutes before pressuring up. Cycle pumps at higher rates up to 5-6 bpm briefly (under 900 psi), allow to bleed down and repeat several times to clear flow path. Resume pumping @ 4 bpm, 400 psi sustained. 7/1/2017 7/2/2017 3.50 INTRMI CEMENT CIRC T Circulate bottoms up from 4 bpm, 410 14,976.0 14,976.0 20:30 00:00 psi, stage up to 6 bpm, 430 psi sustained without packing off. Shakers producing steady cuttings returns, small dark sand/pulverized shale/day. SIMOPS- WU and rack back 23 stands 4" 15.7# DP. (Observe pressure changes @ 6.5 bpm after midnight) 7/2/2017 7/2/2017 6.75 INTRMI CEMENT CIRC T Continue to circulate and condition 14,976.0 14,976.0 00:00 06:45 hole for cementing, stage up to 6.0 bpm max without packing off. 7/2/2017 7/2/2017 2.50 INTRMI CEMENT CIRC P Circulate casing volume @ 5 bpm, 14,976.0 14,976.0 06:45 09:15 400 psi. SIMOPS- PIU 33 stands 4" 15.7# DP via mousehole. 7/2/2017 7/2/2017 0.50 INTRMI CEMENT OWFF P Shut down pumps, observe well for 14,976.0 14,976.0 09:15 09:45 flow, static. SIMOPS:PJSM on cementing with crew. 7/2/2017 7/2/2017 0.25 INTRM1 CEMENT CMNT P Blow down Top Drive. Hook up 2" 14,976.0 14,976.0 09:45 10:00 Cement lines. Break circulation with MP #2 and stage up to 5bpm. No pressure anomalies. Shut down pump and line up to SLB oementers. 7/2/2017 7/2/2017 0.75 INTRMI CEMENT CMNT P SLB pump 1 bbl water to flood lines. 14,976.0 14,976.0 10:00 10:45 Pressure test lines to 3,000psi- Good. Mix and pump 20 bbls of 13 ppb Mud Push It. Drop bottom plug with 300 psi rupture diaphragm. Mix and pump 47 bbls of 15.8# Class "G" slurry with 0.080gal/sack D177 Retarder for a 19 hr pump time. Drop Solid Body Top plug. Push out plug with 20 bbls of 8.33 ppg H2O Page 15/30 Report Printed: 8/16/2017 Operations Summary (with Timelog Depths) LcAhL CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time Dur (hr) PVI Op Coale AGimty Chide Time P -T -X open start Depth We) End Depth (ttKB) 7!2/2017 7/2/2020 177 4.2.2 5 INTRMI CEMENT CMNT P Chase with 10.8 ppg mud with #2 Mud 14,976.0 14,976.0 1045 15:00 Pump Start out at 4.5 bpm for 400stks then reduce to 4bpm. At 4,885 stks, reduce pump rate to 30 spm when the pressure started to rise abruptly. Continue to manage flow rate to keep pressure below 1300psi and 100% returns. Reduce flow rate to 1.8 bpm at 5748 stks, 1.5 bpm at 6073 stks and then 1 bpm unit) bumping the plug at 6594 stks FCP 1,200 psi. Pressure up to 1700 psi for 5 min. Bleed off pressure and check floats- Good. OP 01424 hrs. No Fluid losses during job. 7/2/2017 7/2/2017 2.00 INTRMI CEMENT RURD P Blow down and rig down cement 14,976.0 0.0 15:00 17:00 equipment and Volant CRT, lay down from rig floor. Pull landing joint and lay dawn. Pull thin wall wear bushing. 7/2/2017 7/2/2017 1.00 INTRMI CEMENT W WSP P Set and test 7-5/8" Packoff to 5000 psi 0.0 0.0 17:00 18:00 for 10 minutes CPAI witnessed, good. 7/2/2017 7/212017 1.50 INTRMI WHDBOP RURD P PJSM, Change out upper rams from 7 0.0 0.0 18:00 19:30 -5/8" SBR to 3-1/2" x 6" VBR. SIMOPS- R/U BOP testing equipment. Set test plug. 7/2/2017 7/2/2017 0.50 INTRMI WHDBOP RURD P Fill stack and choke manifold with 0.0 0.0 19:30 20:00 water, purge out air. 7/212017 7/3/2017 4.00 INTRMI WHDBOP BOPE P Test SOPE with 4" test joint to 0.0 0.0 20:00 00:00 250/3800 psi charted 10 minutes each. Test witnessed by AOGCC Brian Bixby, BLM rep Mutasim Elganzoory confirmed 72 hr notice 6/23 10:04 unable to witness. Tested annular, 4" Kill Demco, Upper /BOP. CV #1, 12, 13, 14, Upper 3%:" x 6" VBR, HCR Kill, CV# 9, 11, Manual /BOP. CV# 5, 8, 10, XT -39 Dart, CV# 4, 6, 7, XT -39 FOSV. CV #2, HCR . Choke and Kill, Lower 31/2'x 6" VBR. Tested rig gas/H2S alarm system. 7/3/2017 713/2017 0.50 INTRMI WHDBOP BOPE P Continue Test BOPE witnessed by 0.0 0.0 00:00 00:30 AOGCC Brian Bixby, BLM rep Mulasim Elganzoory confirmed 72 hr notice 6/23 10:04 unable to witness. UD 4" TJ, Install 4%f TJ, Perform accumulator function test. Initial system pressure=3000 psi, Pressure after functioning all rams, annular and HCR's=1400 psi. 200 psi attained=32 sec with electric pump, Full system recovery= 159 sec with electric and air pumps. 4 bottle N2 average=2175 psi. Operate remote stations. Page 16/30 Report Printed: 811612017 Operations Summary (with Timelog uepths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Tme End Tama DN (hr) Phase Op Code Activity Code Time P-T-XStart OpBletiop Depth (MB) End Depth (NCB) 7/3/2017 7/3/2017 3.00 INTRMI WHDBOP ROPE P % With 4' test joint, test Annular 0.0 0.0 00:30 03:30 preventer, 31 ' X 6" Upper and Lower VBR's, CV# 3, 4, 6 to 250/3800 psi for 10 minutes each charted. Pull test It, lest blind rams to 250/3800 psi for 10 minutes each charted. Drawdown test manual and super auto choke to 1100 psi. Function test flow meters/ alarms, PVT alarms. 7/3/2017 7/3/2017 0.75 INTRMI WHDBOP RURD P Drain stack, blow down choke and kill 0.0 0.0 03:30 04:15 lines. Rig down test equipment. Pull test plug, install 7.125" ID wear ring per FMC rep. C/O master) split bushings. 7/3/2017 7/3/2017 2.50 INTRMI CEMENT RURD P PJSM, C/O top drive saver sub to XT- 0.0 0.0 04:15 06:45 39, change out grab heads. 7/3/2017 7/3/2017 0.50 INTRMI CEMENT SHAH P Clean and Gear rig floor, mobilize 0.0 0.0 06:45 07:15 BHA components to rig floor. 7/3/2017 7/3/2017 1.25 INTRMI CEMENT SLPC P PJSM, slip and cut 5 wraps, 105' of 0.0 0.0 07:15 08:30 drilling line. Inspect and grease linkage. Reset block height. 7/3/2017 7/3/2017 0.50 INTRMI CEMENT SVRG P Service topdrive and draw works, 0.0 0.0 08:30 09:00 7/3/2017 7/3/2017 3.00 INTRMI CEMENT PULD P P/U 4" 15.7# DP from pipe shed, 0.0 0.0 09:00 12:00 make up 21 stands and rack back. 7/3/2017 7/3/2017 5.00 INTRMI CEMENT PULD P P/U 4" 15.7# and 14# DP from pipe 0.0 0.0 12:00 17:00 shed, make up 52 stands and rack back. Total in derrick 121 stands 15.7#, 8 stands 14#. 7/3/2017 7/3/2017 2.00 INTRMI CEMENT BHAH P PJSM, M/U BHA #3 per SLB 0.0 309.0 17:00 19:00 DD/MWD to 309' MD. 7/3/2017 7/3/2017 2.25 INTRMI CEMENT PULD P Single in hole with BHA #3, picking up 309.0 2,197.0 19:00 21:15 4" 14# DP from pipe shed from 309' MD to 2,197' MD. S/O=75k. 7/3/2017 7/3/2017 0.50 INTRMI CEMENT DHEQ P Shallow test MWD @ 200 gpm, 950 2,197.0 2,197.0 21:15 21:45 psi -Good. 7/3/2017 7/4/2017 2.25 INTRMI CEMENT PULD P Continue single in hole with 4" 14# 2,197.0 4,500.0 21:45 00:00 DP, filling every 20 stands to 4,500' MD. P/U=115k, S/0=100k. OA pressure @ 22:00 hrs= 125 psi 7/4/2017 7/4/2017 10.50 INTRMI CEMENT PULD P Continue RIH f/ 4500'to 14,584' MD 4,500.0 14,584.0 00:00 10:30 filling pipe every 20 stands. P/U= 200 S/0= 100. 7/4/2017 7/4/2017 2.00 INTRMI CEMENT PRTS P R/U testing equipment and tested 7 14,584.0 14,584.0 10:30 12:30 5/8" Casing to 3800 psi and held for 30 min. Bleed off and rigged down. 7/4/2017 7/4/2017 1.50 INTRMI CEMENT COCF P Washed down f/ 14,584'to 14,844' 14,584.0 14,844.0 12:30 14:00 MD w/ 220 gpm, 2340 psi, 40 rpm, and tagged TOC. 7/4/2017 7/4/2017 2.50 INTRMI CEMENT DRLG P Drill out shoe track f/ 14,844' to 14,844.0 14,967.0 14:00 16:30 14,967' MD w/ 150-230 gpm, 1300- 2410 psi, 60 rpm, 5-18k TQ. 7/4/2017 7/4/2017 0.50 INTRMI CEMENT DRLG P Reamed out shoe and cleaned out rat 14,967.0 14,986.0 16:30 17:00 hole to 14,986' MD. 7/4/2017 7/4/2017 0.50 INTRMI CEMENT DDRL P Drilled 20' of new formation f/ 14,986' 14,986.0 15,006.0 17:00 17:30 MD to 15,006' MD. 7/4/2017 7/4/2017 2.00 INTRMI CEMENT CIRC P Back reamed to the shoe and 15,006.0 14,961.0 17:30 19:30 circulated BU while conditioning mud for FIT. Page 17130 Report Printed: 811612017 - Operations Summary (with Timelog Depths) CD5-314X 6 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time EM Time Dur (hr) Phase Op Code I Acevlry Code Time P-T-X Operation start Depth (RKB) EM Depth (1001) 7/4/2017 7/4/2017 1.00 INTRMI CEMENT FIT P Performed FIT to 13 ppg EMW with 14,961.0 14,961.0 19:30 20:30 10.7 ppg mud, 890 psi, and 7414' ' TVD. Pumped 1.8 bbl and received 1 bbl. 7/4/2017 7/4/2017 1.00 PROD? DRILL MPDA P Removed trip nipple and installed 14,961.0 14,961.0 20:30 21:30 RCD bearing. 7/4/2017 7/4/2017 0.50 PROD1 DRILL REAM P Washed down f/ 14,961' to 15,006' 14,961.0 15,006.0 21:30 22:00 MD w/ 230 gpm, 2350 psi, 60 rpm, and 16k To. 7/4/2017 7/5/2017 2.00 PROD1 DRILL DDRL P Drilled f/ 15,006'to 15,056' MD w/ 230 15,006.0 15,056.0 22:00 00:00 gpm, 2410 psi, 60 rpm, 12-18k To. 8- 18 WOB. P/U= 220, S/O= 112, ROT= 153. 11.6 ECD. 7/5/2017 7/5/2017 1.75 PROD1 DRILL OTHR P Shut in and performed drawdown test. 15,056.0 15,056.0 00:00 01:45 Observed pressure build several times f/ 200 to 350 psi over similar time frames indicating higher than anticipated PP. 7/5/2017 7/5/2017 1.00 PRODi DRILL CIRC P Circulated BU w/ 260 gpm, 2330 psi, 15,056.0 15,056.0 01:45 02:45 60 rpm, and 7k TO. Observed pit gain as gas was circulated to surface. Shut down and lined up to take returns through gas buster before resuming BU. 7/5/2017 7/5/2017 1.75 PRODt DRILL OTHR P Shut in chokes while trapping 346 psi 15,056.0 15,056.0 02:45 04:30 and watched build to 408 psi in 10 min. Bleed off DP and observed floats were not holding. Attempted to surge floats closed several times without, success. 7/5/2017 7/5/2017 2.50 PRODi DRILL CIRC P Circulated out gas through the gas 15,056.0 15,056.0 04:30 07:00 buster w/ 250 gpm, 2290 psi, 60 rpm, and 6k TO. Observed 1718 units of gas on BU. 7/5/2017 7/5/2017 3.00 PROD1 DRILL CIRC P Weighted up f/ 9.5 ppg to 9.8 ppg w/ 15,056.0 15,056.0 07:00 10:00 260 gpm, 2280 psi, 60 rpm, 7k TO. Pumped a 29 bbl nut plug sweep w/ 20 bbl H2O to clean floats and attempted to close by surging 3 times. successfully closed chokes the 4th time by pressuring up to 1000 psi and bleeding back while slacking off. 7/5/2017 7/6/2017 14.00 PROD1 DRILL DDRL P Obtained survey and drilled f/ 15,056' 15,056.0 16,676.0 10:00 00:00 to 16,676' MD w/ 260 gpm, 2640 psi, 160 rpm, 15 WOB, 14.5k Tq, 11.3 ppg ECD. Making dynamic connections holding 270 psi. Weighted up to 10 ppg on the fly at 15,056' MD. Pumped a 115 bbl 10# brine sweep at 16,009' MD to mitigate floats sticking open. 7/6/2017 7/6/2017 9.50 PROD1 DRILL DDRL P Drilled f/ 16,664'to 17,664' MD 16,676.0 17,664.0 00:00 09:30 holding 320 psi on connections. Pumped 40 bbl brine sweeps every 6 hrs. Observed 1000 units of gas and decided to CBU. 7/6/2017 7/6/2017 2.00 PRODi DRILL CIRC P Circulated BU w/ 260 gpm, 2780 psi, 17,664.0 17,664.0 09:30 11:30 100 rpm, 12.5k To. 7/6/2017 7/6/2017 0.50 PROD1 DRILL OTHR P Performed draw down test and 17,664.0 17,664.0 11:30 12:00 determined PP to be —11.1 ppg equivalent MW. Page 18130 Report Printed: 811612017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log sten Time Ens Time our (W) Phase Op Code Activity Code TMe P-T-Xson Opera san cepth (ftKB) EM Depth ( KS8 7/6/2017 7/6/2017 1.50 PROD1 DRILL CIRC P Circulated BU to condition mud and 17,664.0 17,664.0 12:00 13:30 check foras w/ 260 g gpm, 2770 psi, 100 rpm, 12k TQ. 7/6/2017 7/6/2017 5.00 PROD1 DRILL DDRL P Drilled f/ 17,664' to 17,920' MD w/ 260 17,664.0 17,920.0 13:30 18:30 gpm, 2550 psi, 15 WOB, 160 rpm, 17k TQ. P/U= 205, S/O= 110, ROT= 150. Weighted up mud to 10.4 ppg on the fly. 7/6/2017 7/6/2017 2.00 PROD1 DRILL MPDA T RCD bearing failed. P/U and spaced 17,920.0 17,920.0 18:30 20:30 out DP. Closed annular and held 500 psi on the well while installing a new bearing. Washed back to bottom. 7/6/2017 7/612017 0.50 PROW DRILL DDRL P Drilled f/ 17,920'to 17,958' MD, 7,438' 17,920.0 17,958.0 20:30 21:00 TVD, 7/6/2017 7/7/2017 3.00 PROD1 DRILL CIRC T Trouble shot MWD communication 17,958.0 17,958.0 21:00 00:00 failure. 717/2017 7/7/2017 0.75 PROD1 DRILL EQRP T Ramped down pumps, trapping 400 17,958.0 17,958.0 00:00 00:45 psi. Changed out stand pipe transducer for MWD while troubleshooting cause of lost signal. 7/7/2017 7/7/2017 0.75 PROD1 DRILL CIRC T Resumed circulating and attempting to 17,958.0 17,913.0 00:45 01:30 regain MWD sync. attempted manual down links w/ no results. Racked back 1 stand to move circulation point in formation. 7/7/2017 7/7/2017 0.50 PROD1 DRILL CIRC T Continued circulating at 265 gpm, w/ 17,913.0 17,913.0 01:30 02:00 2540 psi when pressure spiked to 3100 psi and held. Derision was made to POOH and replace MWD tools. a final downlink was attempted w/ no success. 7/7/2017 7/7/2017 5.00 PROD1 DRILL WAIT T Circulated and dcipdcated pipe w/ 135 17,913.0 17,913.0 02:00 07:00 gpm, 1250 psi while preparing to displace well to 11.5 kill weight brine. Waited for final loads of brine f/ mud planed and held PJSM. 7f7/2017 7/7/2017 2.25 PROD1 DRILL DISP T Displaced well to 11.5 ppg viscous 17,913.0 17,913.0 07:00 09:15 1 brine w/ 250 gpm, 2300-2750 psi, 100 rpm, 10k TQ. 733 bbl pumped. 7/7/2017 7/7/2017 0.50 PROD1 DRILL OWFF T OWFF, well static. Dropped 2.12" 17,913.0 17,913.0 09:15 09:45 hollow drift and lined up to strip OOH. 7/7/2017 717/2017 3.25 PROD1 DRILL TRIP T POOH on elevators f/ 17,913' to 17,913.0 14,867.0 09:45 13:00 14,867' MD. P/U= 192 7/7/2017 7/7/2017 2.00 PRODt DRILL CIRC T Circulated BU at the shoe w/ 160 gpm, 14,867.0 14,867.0 13:00 15:00 900 psi, 40 rpm, 5.5k TQ. 7/7/2017 7/7/2017 0.50 PROD1 DRILL OWFF T OWFF, well static. 14,667.0 14,867.0 15:00 15:30 7/7/2017 7/8/2017 8.50 PROD1 DRILL TRIP T POOH f/ 14,897' to 3,241' MD. 14,867.0 3,241.0 15:30 00:00 7/8/2017 7/8/2017 1.00 PROD1 DRILL TRIP T POOH f/ 3,241" to 2,007" MD. 3,241.0 2,007.0 00:00 01:00 7/8/2017 7/8/2017 0.75 PRODi DRILL DHEA T Break circulation w/ 210 gpm, 1200 2,007.0 2,007.0 01:00 01:45 psi and attempted to gain communication w/ tools. Received sync after a downlink but no data. 7/8/2017 7/8/2017 0.50 PROD1 DRILL MPDA T Removed RCD bearing and installed 2,007.0 2,007.0 01:45 02:15 I trip nipple. 7/8/2017 7/8/2017 1.25 HHUU1 DRILL TRIP T POOH f/ 2,007'to 400' MD. 2,007.0 400.0 02:15 03:30 Page 19130 Report Printed: 811612017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Litre Our (hr) Phesa Op Cale Achm Cotle N Time P -T- X Operabon Start Depth MKB) Ertl DepN (MB) 7/8/2017 7/8/2017 1.00 PROD1 DRILL BHAH T UD BHA as per SLB. Noted both 400.0 0.0 03:30 04:30 floats were stuck open with marble size debris. Soft in texture, very minor reaction to acid. Would not disolve in water. 7/8/2017 7/8/2017 0.50 PROD1 DRILL SHAH T Cleaned and cleared rig floor. 0.0 0.0 04:30 05:00 7/8/2017 7/8/2017 1.00 PROD1 DRILL BHAH T M/U new BHA to 313' MD. 0.0 313.0 05:00 06:00 7/8/2017 7/8/2017 1.25 PROD1 DRILL TRIP T RIH f/ 313- to 2,201' MD. 313.0 2,201.0 06:00 07:15 7/8/2017 7/8/2017 0.50 PROD? DRILL DHEQ T Shallow test MWD tools w/ 220 gpm, 2,201.0 2,201.0 07:15 07:45 940 psi. Test good. 7/8/2017 7/8/2017 8.00 PRODt DRILL TRIP T RIH f/ 2,201' to 14,871' MD filling pipe 2,201.0 14,871.0 07:45 15:45 every 20 stands. 7/8/2017 7/8/2017 1.00 PROD1 DRILL SLPC T Slip and Cut 60' of drill line. 14,871.0 14,871.0 15:45 16:45 7/8/2017 7/8/2017 0.50 PROD1 DRILL SVRG T Service TD, DW, and flow check. 14,871.0 14,871.0 16:45 17:15 7/8/2017 7/8/2017 0.50 PROD1 DRILL MPDA T Removed trip nipple and installed 14,871.0 14,871.0 17:15 17:45 RCD bearing. 7/8/2017 7/8/2017 2.25 PROD1 DRILL TRIP T RIH f/ 14,871'to 17,822' MD. 14,871.0 17,822.0 17:45 20:00 7/8/2017 7/8/2017 3.25 PROD1 DRILL DISP T Displaced well back to 10.5 ppg 17,822.0 17,822.0 20:00 23:15 FloPro w/ 210 gpm, ICP= 1630 psi, FCP= 1980 psi. 7/8/2017 7/9/2017 0.75 PRODi DRILL REAM T Lined up to make dynamic 17,822.0 17,958.0 23:15 00:00 connections w/ MPD and reamed back to bottom w/ 250 gpm, 2440 psi, 40 rpm, 9.5k TQ. 7/9/2017 719/2017 12.00 PROD1 DRILL DDRL P Drilled f/ 17,985' to 18,966' MD, 7440 17,958.0 18,966.0 00:00 12:00 TVD w/ 260 gpm, 2920 psi, 140 rpm, 8k WOB, 11.93 ppg ECD, 17.5k TO P/U= 218, S/O= 100, ROT= 154. 7/9/2017 7/10/2017 12.00 PROD1 DRILL DDRL P Drilled f/ 18,966'to 20,109' MD, 7444 18,966.0 20,109.0 12:00 00:00 TVD w/ 260 gpm, 3050 psi, 140 rpm, 12k WOB, 12.08 ppg ECD, 17k TO, P/U= 216, S/O= 97, ROT= 152. 7/10/2017 7/10/2017 12.00 PROD1 DRILL DDRL P Drilled f/ 20,109'to 21,100' MD, 7447 20,109.0 21,100.0 00:00 12:00 TVD w/ 260 gpm, 3150 psi, 140 rpm, 5k WOB, 12.03 ppg ECD, 17.5k TO, P/U= 225. 7/10/2017 7/1012017 8.50 PRODt DRILL DDRL P Drilled 1/21,100'to 21,428' MD, 7450 21,100.0 21,428.0 12:00 20:30 TVD w/ 260 gpm, 3180 psi, 140 rpm, 15k WOB, 11.893 ppg ECD, 17.5k TO, P/U= 233. 7/10/2017 7/11/2017 3.50 PROD? DRILL CIRC T Noficed erratic pressure on the stand 21,428.0 21,428.0 20:30 00:00 pipe and started loosing MWD signal. Started troubleshooting at surface w/ no success. Checked pump screens, pumped a brine sweep as well as 2 x 10 ppb nut plug sweeps. 260 gpm, 3000 psi, 70-160 rpm, 10k TQ. 7/11/2017 7/11/2017 0.50 PROD1 DRILL CIRC T Continued to trouble shoot MWD 21,428.0 21,428.0 00:00 00:30 signal loss. pumped 55 bbl nut plug sweep w/ 150 gpm, 1440 psi, 70 rpm, and 9.2k TQ. 7/112017 7/11/2017 0.25 PROD1 DRILL DDRL P Drilled f/ 21,428'to 21,430' MD in an 21,428.0 21,430.0 00:30 00:45 attempt to regain signal w/ on bottom stabilization, no success. Page 20130 Report Printed: 811 612 01 7 Operations Summary (with Timelog Depths) C D5 -314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start TTM EMTns Ow pr) Phase op Code Activity Code Time P -T -X. opershon Seed dptn (flKa Entl Oepih (ttKa) 7/11/2017 7/11/2017 1.75 PROD1 DRILL BKRM T Reamed back and racked back a 21,430.0 21,347.0 00:45 02:30 stand while circulating at 260 gpm, 2910 psi, 100 rpm, 10k TO. SimOps, prep pits for displacement. 7/11/2017 7/11/2017 3.50 PRODt DRILL DISP T Displace well to 11.5 ppg brine w/ 260 21,347.0 21,347.0 02:30 06:00 gpm, 2900 -2220 psi, 100 rpm, 10k To. OWFF, well static, and lined up to strip OOH. 7/11/2017 7/11/2017 6.00 PROD1 DRILL SMPD T SOOH f/ 21,430'to 14,871' MD 21,347.0 14,871.0 06:00 12:00 holding 50-30 psi on the back side. P/U= 195. 7/11/2017 7/11/2017 2.00 PROD1 DRILL CIRC T Circulated BU at the shoe w/ 6 bpm, 14,871.0 14,871.0 12:00 14:00 1830 psi, 50 rpm, 11.92 ECD. 7/11/2017 7/12/2017 10.00 PRODt DRILL SMPD T SOOH f/ 14,871'to 3,725' MD holding 14,871.0 3,725.0 14:00 00:00 150 psi on the back side. Culling wom 14# 4" DP. 7/12/2017 7/12/2017 1.25 PROD1 DRILL SMPD T SOOH f/ 3,725' to 3,053' MD culling 3,725.0 3,053.0 00:00 01:15 worn 14# DP. P/U= 100, 7/12/2017 7/12/2017 0.50 PRODt DRILL MPDA T Pulled RCD bearing and installed trip 3,053.0 3,053.0 01:15 01:45 nipple. 7/12/2017 7/12/2017 3.25 PROD1 DRILL TRIP T - TOOH f/ 3,05310 313' MD, culling 14# 3,053.0 313.0 01:45 05:00 DP on the way. Total 14# culled for HB this trip = 26 AS 7/12/2017 7/12/2017 1.00 PRODt DRILL SHAH T L/D BHA as per SLB. 313.0 0.0 05:00 06:00 7/12/2017 7/12/2017 0.75 PROD1 DRILL WASH T Clean and dear rig floor. P/U stack 0.0 0.0 06:00 06:45 washing tool and flush stack. 7/12/2017 7/12/2017 1.25 PROD1 DRILL BOPE T Drained stack and removed wear ring. 0.0 0.0 06:45 08:00 Set test plug and R/U for BOP test. Filled stack w/ H2O and purged system of air. 7/12/2017 7/12/2017 6.50 PROD1 DRILL BOPE T Tested ROPE, Test witness waived by 0.0 0.0 08:00 14:30 AOGCC Guy Cook. Jessie Chmielowski with BLM "notification recieved" 7/11/17 9:30AM. Tested annular to 250/2500 psi w/ 4" and 4.5" test joints for 5 min. Tested 4" Kill, valves #1-14, manual and auto IBOP, Upper VBR, HCR Kill and Choke, . FOSV, Manual kill and Choke, Lover VBR, and Blind rams to 250/3800 psi for 5 min. Performed Acummulator test: FSP= 3000 psi, PAC= 1300 psi, 200 psi reached in 35 sec, full pressure in 172 sec. N2 average= 2087 psi. Tested rig gas alarms. Performed draw down on manual and supper chokes to 1200 psi. 7/12/2017 7/12/2017 0.50 PROD1 DRILL BOPE T B/D choke and kill lines, pulled test 0.0 0.0 14:30 15:00 plug and set 7.125" ID wear ring. 7/12/2017 7/12/2017 0.50 PROD? DRILL PULD T PIU tools and equipment to rig floor. 0.0 0.0 15:00 15:30 7/12/2017 7/12/2017 1.00 PROD1 DRILL SLPC T Slip and Cut 38' of drill line. 0.0 0.0 15:30 16:30 7/12/2017 7/12/2017 0.75 PRODi DRILL SVRG T Service TD and DW. Calibrated block 0.0 0.0 16:30 17:15 height. 7/12/2017 7/12/2017 1.75 PROD1 DRILL SHAH T M/U new BHA #5 as per SLB. 0.0 312.0 17:15 19:00 7/12/2017 7/12/2017 0.75 PROW DRILL TRIP T RIH f/ 312'to 2,200' MD, PIU 3 joints 312.0 2,200.0 19:00 19:45 I of 4" DP from pipe shed. Page 21130 Report Printed: 8/16/2017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log $tart Time End Time Dia (hr) phage Dp Code Adrviry code Time P-T-X Operation Stan Depth MKB) End Depth (itlCe) 7/12/2017 7/12/2017 0.50 PROD1 DRILL DHEO T Shallow test MWD wl 220 gpm, 1020 2,200.0 2,200.0 19:45 20:15 psi. Test Good. 7112/2017 7/12/2017 0.25 PROD1 DRILL TRIP T RIH f/ 2,200 to 2,768' MD. 2,200.0 2,768.0 20:15 20:30 7/12/2017 7/12/2017 0.50 PROD1 DRILL OWFF T OWFF due to aerated mud. 2,768.0 2,768.0 20:30 21:00 Circulated 4 bpm, 510 psi until aergted mud was clear and well static. 7/12/2017 7/13/2017 3.00 PROD1 DRILL TRIP T RIH f/ 2,768 to 8,214' MD filling pipe 2,768.0 8,214.0 21:00 00:00 1 every 20 stands. 7/13/2017 7/13/2017 4.50 PROD1 DRILL TRIP T RIH f/ 8,214 to 14,871' MD filling pipe 8,214.0 14,871.0 00:00 04:30 every 20 stands. S/O= 125, 7/13/2017 7/13/2017 0.25 PRODt DRILL OWFF T OWFF, well static. 14,871.0 14,871.0 04:30 IN 1 7/13/2017 7/13/2017 0.25 PROD1 DRILL MPDA T Removed trip nipple and installed 14,871.0 14,871.0 04:45 05:00 RCD bearing. 7/13/2017 7/13/2017 5.25 PRODt DRILL TRIP T RIH f/ 14,871 to 21,254' MD filling pipe 14,871.0 21,254.0 05:00 10:15 every 20 stands. Took Survey at 19,631' MD. 7/13/2017 7/13/2017 3.75 PROD1 DRILL DISP T Displaced well back to 10.5 ppg 21,254.0 21,315.0 10:15 14:00 FloPro w/ 250 gpm, 2500-3020 psi, 80 rpm, 9.5k TO, ROT= 155. 7/13/2017 7/13/2017 0.25 PRODi DRILL WASH T Wash back to bottom f/ 21,345'to 21,315.0 21,430.0 14:00 14:15 21,430' MD w/ 260 gpm, 3060 psi, 100 rpm, 11.5k To. 7/13/2017 7/14/2017 9.75 PROD1 DRILL DDRL P Drill f/ 21,430'to 22,630' MD while 21,430.0 22,630.0 14:15 00:00 making dynamic connections w/ MPD. 7,468' TVD. 120 rpm, 16.5k Tq, 260 gpm, 3310 psi, 12.06 ppg ECD, 10k WOB, P/U= 225, ROT= 156. 7/14/2017 7/14/2017 12.00 PROD1 DRILL DDRL P Drill fl 22,630'to 23,694'MD while 22,630.0 23,694.0 00:00 12:00 making dynamic connections w/ MPD. 7,472' TVD. 120 rpm, 16.5k Tq, 260 gpm, 3330 psi, 12.18 ppg ECD, 10k WOB, P/U= 231, ROT= 154. 7/14/2017 7115/2017 12.00 PROD1 DRILL DDRL P Drill f/ 23,694'to 24,515'MD while 23,694.0 24,515.0 12:00 00:00 making dynamic connections w/ MPD. 7,475' TVD. 80 rpm, 15k Tq, 265 gpm, 3710 psi, 12.27 ppg ECD, 10k WOB, P/U= 226, ROT= 156. 7/15/2017 7/15/2017 12.00 PROD1 DRILL DDRL P Drill f/ 24,515'to 25,586' MD while 24,515.0 25,586.0 00:00 12:00 making dynamic connections w/ MPD. 7,481' TVD. 140 rpm, 19k Tq, 260 gpm, 3950 psi, 12.7 ppg ECD, 11k WOB, P/U= 252, ROT= 152. 7/15/2017 7/15/2017 4.25 PRODt DRILL DDRL P Drilled f/ 25,586'to 26,013' MD. 25,586.0 26,013.0 12:00 16:15 Noticed MPD elements failing. 7/15/2017 7/15/2017 1.00 PROD1 DRILL CIRC P Circulated OH volume w/ 260 gpm, 26,013.0 26,013.0 16:15 17:15 3930 psi, 100 rpm, 14k TO. 7/15/2017 7/15/2017 0.75 PROD1 DRILL MPDA P Swapped out RCD bearing for a new 26,013.0 26,013.0 17:15 18:00 one while holding 380 psi on the back side. 7/15/2017 7/16/2017 6.00 PROD1 DRILL DDRL P Drilled f/ 26,013' to 26,567' MD, 7,489' 26,013.0 26,567.0 18:00 00:00 TVD w/ 120 rpm. 260 gpm, 3980 psi, p 11 k WOB, 12.77 ppg ECD, 17.5k TO, P/U= 246, ROT= 151. Page 22130 ReportPrinted: 8/16/2017 -, Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log start Time End rime our Qv) Phese op Code Aa "i Code I mie P -T -X Operalron Siert Depth in e) End Depth QtlB) 7/16/2017 7/16/2017 5.00 PROD1 DRILL DDRL P Drilled f/ 26,967' to TD (c3 27,010' MD, 26,567.0 27,010.0 00:00 05:00 7,494' ND w/ 260 gpm, 4100 psi, 120 rpm, 13k WOB, 12.73 ppg ECD, 21k TQ, P/U= 262, ROT= 155. 7/16/2017 7/16/2017 4.00 PROD1 CASING CIRC P Circulated 1.75 BU w/ 260 gpm, 4050 27,010.0 26,967.0 05:00 09:00 psi, 15k TQ while racking back a stand/BU. 7/16/2017 7/16/2017 2.75 PROD1 CASING OWFF P Fingerprint formation w/ MPD system. 26,967.0 26,967.0 09:00 11:45 Bleed off 3-5 bbl per time opening and dosing chokes. Shut in pressure dropped f/ 420 psi to 370 psi, -11.5 ppg EMW. 7/16/2017 7/16/2017 8.00 PRODi CASING CIRC P Circulated 5x BU w/ 260 gpm, 4070 26,967.0 26,681.0 11:45 19:45 psi, 140 rpm, 15k TQ. BU after the fingerprint showed 2500 gas units and was diverted through the gas buster. 7/16/2017 7/17/2017 4.25 PROD? CASING DISP P Displaced well to 11.6 ppg Brine w/ 26,681.0 26,681.0 19:45 00:00 250 gpm, 3670-2040 psi, 80 rpm, 13k TO. 7/17/2017 7/17/2017 1.00 PROM CASING OWFF P OWFF, Performed draw down test to 26,681.0 26,681.0 00:00 01:00 determine well was breathing. repeatedly bleed off pressure and saw climb to 45 psi over longer time intervals. Opened and observed flow for 15 min. Steady stream with slight reduction over time. Shut in and watched pressure build to 48 psi over 15 min. WELL BREATHING. 7/17/2017 7/17/2017 0.25 PROD1 CASING CIRC P Took SPR w/ 15 and 25 strokes/min. 26,681.0 26,681.0 01:00 01:15 7/17/2017 7/17/2017 3.50 PROD1 CASING BKRM P BROOH f/ 26,681'to 25,441' MD w/ 26,681.0 25,441.0 01:15 04:45 210 gpm, 2280-2190 psi, 100 rpm, 11.5k TQ, holding 60 psi on connections. Obtained SIO of 92 @ 25,645' MD. Dusted MW up to 11.7 ppg on the fly. 7/17/2017 7/17/2017 5.50 PROD1 CASING CIRC P Circulated gas out from fingerprinting 25,441.0 25,441.0 04:45 10:15 and 2X BU in preparation to SOOH w/ 245 gpm, 2930 gpm, 80 rpm, 11.5k TO. Gas peaked at 1055 units w/ 11.4 ppg MW out. 7/17/2017 7/17/2017 1.75 PROD1 CASING OWFF P OWFF, Drawed down formation and 25,441.0 25,441.0 10:15 12:00 opened up to OWFF. Observe well breathing back at diminishing rate. 3.5 bblthr initial to .14 bph over 1 hr WELL BREATHING. Bled back approx 2 bbls total 7/17/2017 7/17/2017 7.00 PROD? CASING BKRM P Attempted to SOOH and encountered 25,441.0 23,059.0 12:00 19:00 30k overpull after 2 stands. Continued to BROOH f/ 25,441' to 23,059' MD w/ 220 gpm, 2500 psi, 80 rpm, 11 k TQ, holding 80 psi on connections. 7/17/2017 7/17/2017 1.50 PROD1 CASING CIRC P Circulated 2X OH volume w/ 225 gpm, 23,059.0 22,963.0 19:00 20:30 2300 psi, 80 rpm, 10k TQ. ' 7/17/2017 7/18/2017 3.50 PRODt CASING BKRM P Attempted to SOOH and encountered 22,963.0 21,790.0 20:30 00:00 30k overpull. BROOH f/ 22,963' to 21,790' MD w/ 225 gpm, 2510 psi, 80 rpm, 10k TQ, holding 80 psi on connections. Page 23/30 Report Printed: 8/16/2017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Siad lime End Time our (hr) Phase Op Code Activity Godo Time P -T -X Operation sw Depth (MB) End Depth.(/MB) 7/18/2017 7/18/2017 1.50 FROM CASING BKRM P Continue BROOH from 21,790' MD to 21,790.0 21,060.0 00:00 01:30 21,060' MD(r$ 225 gpm, 2320 psi, 80- 100 rpm, 9.5-10.5k Tq. ECD= 12.45 ppg EMW. Holding 80- psi annular pressure in slips. 7/18/2017 7/18/2017 0.50 PRODi CASING CIRC P Circulate open hole volume (1750 21,060.0 20,965.0 01:30 02:00 stks) @ 230 gpm, 2400 psi, 100 rpm, 9.5k Tq. ECD= 12.47 ppg EMW. Reciprocate from 21,060'-20,965' MD. 7/18/2017 7/18/2017 6.00 PROD1 CASING SMPD P Strip out with MPD from 20.965' MD to 20,965.0 14,965.0 02:00 08:00 14,965' MD holding 175 psi annular pressure pulling and 80 psi in slips. P/U=185k, S/0=130k, ROT=155k. 7/1812017 7/18/2017 1.50 PROD- CASING CIRC P CBU @ 250 gpm, 2430 psi, 80 rpm, 14,965.0 14,965.0 08:00 09:30 6.5k To, ECD= 12.2-12.3 ppg EMW. No gas observed @ bottoms up. 7/18/2017 7/18/2017 2.00 FROM CASING CIRC P Weight up Visc brine from 11.7 ppg to 14,965.0 14,965.0 09:30 11:30 11.9 ppg with spike Fluid, adding Lube 776 to maintain. 250 gpm, 2430-2120 psi, 80-40 rpm, 6.5-6k Tq. Obtain nbw SPR's with 11.9 ppg fluid. 7/18/2017 7/18/2017 0.50 PROD1 CASING OWFF P OWFF. Close chokes and build 21 psi, 14,965.0 14,965.0 11:30 12:00 open chokes and OWFF, SIMOPS- B/D top drive. Calc fill to shoe= 76 bbl, Actual fill= 157 bbl. OA pressure @ 11:30 hrs= 325 psi 7/18/2017 7/18/2017 0.25 FROM CASING OWFF P Continue OWFF untill static for 10 14,965.0 14,965.0 12:00 12:15 minutes. 7/18/2017 7/18/2017 2.50 PRODt CASING STPD P Strip out with MPD from 14,965' MD to 14,965.0 11,653.0 12:15 14:45 11,653' MD holding 140 psi pulling and 60 psi in slips. 7/18/2017 7/18/2017 0.50 PROD1 CASING OWFF P OWFF, Flow check -static 11,653.0 11,653.0 14:45 15:15 7/18/2017 7/18/2017 7.25 FROM CASING SMPD P Strip out with MPD from 11,653' MD to 11,653.0 1,066.0 15:15 22:30 1,066' MD holding 140 psi pulling and 60 psi in slips. 7/18/2017 7/18/2017 0.25 FROM CASING OWFF P OWFF, Flow check -static 1,066.0 1,066.0 22:30 22:45 PJSM blow down and pull MPD bearing/element, install trip nipple. 7/18/2017 7/18/2017 0.50 PRODi CASING MPDA P Flush MPD lines and chokes with 1,066.0 1,066.0 22:45 23:15 water, blow down system. 7/18/2017 7/18/2017 0.50 FROM CASING MPDA P Remove MPD bearing, install trip 1,066.0 1,066.0 23:15 23:45 nipple. 7/18/2017 7/19/2017 0.25 FROM CASING TRIP P POOH on elevators from 1,066' MD to 1,066.0 403.0 23:45 00:00 403' MD, good hole fill. OA pressure @ 23:00 hrs= 210 psi Total fluid lost to formation today = 51 bbl, Cumulative interval 551 bbl. 7/19/2017 7/19/2017 0.25 FROM CASING OWFF P OWFF, slow drop in annulus. Function 403.0 403.0 00:00 00:15 Annular preventer and upper / lower 314" X 6" VBR's. 7/19/2017 7/19/2017 0.25 FROM CASING TRIP P POOH from 402' MD to 223' MD, lay 403.0 223.0 00:15 00:30 down jars, replace with 1 jt HWDP, rack back 1 stand HWDP. 7/19/2017 7/1912017 0.25 PROD- CASING SFTY P PJSM on UD BHA #5. SIMOPS, 223.0 223.0 00:30 00:45 minitor well, slight drop in annulus. Page 24130 ReportPrinted: 8/16/2017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Mr mr) Phase op Code Activity Code Time P-T-X 0wrahon Depth S ( S) End Depth(8KB) 7/19/2017 7/19/2017 1.00 PRODi CASING SHAH P POOH from 223' MD, rack back stand 223.0 0.0 00:45 01:45 HWDP. L/D BHA #5 per SLB DD/MWD. (Note: observed solids laden paste material in floats and BHA components. Sand, calcuim carbonate, possibly parafin/dope/crosslinked polymer.) Poppet float stuck open with material, one spring broken on flapper, one functional flapper. Observed eccentric wear on pipe and BHA, 1/8"-3/8" under gauge on reamer and stabilizers. Break bit, function blind rams. Total trip Calc Fill=164 bbl, Actual fill=271 bbl. 7/19/2017 7/1912017 0.50 PROD1 CASING SHAH P Clean and clear rig floor of BHA 0.0 0.0 01:45 02:15 components. 7/19/2017 7/19/2017 0.75 COMPZN CASING RURD P Change out elevators to 4Y2" tubing, 0.0 0.0 02:15 03:00 P/U and R/U double stack power tongs and tubing equipment. P/U first joint liner. Monitor well on trip tank, .5 bbl loss. 7/19/2017 7/19/2017 0.50 COMPZN CASING SFTY P PJSM on P/U and run liner. Verify pipe 0.0 0.0 03:00 03:30 count in shed, pert pups on floor, orange peel and XN nipple. 7/19/2017 7/19/2017 8.50 COMPZN CASING PUTS P P/U and RIH with orange peel pert 0.0 8,241.0 03:30 12:00 pup shoe, 4W" TXP liner and pert pups per detail to 8,241' MD, 200 its in hole Torquing TXP to 7400 ft/lbs with Run-NSeal dope. 7/1912017 7/19/2017 4.00 COMPZN CASING PUTS P Continue P/U and RIH with 4W TXP 8,241.0 12,078.0 12:00 16:00 liner and pert pups per detail to 12,078' MD. 7/19/2017 7/19/2017 1.00 COMPZN CASING PUTS P M/U XN nipple, 3.813" with 3.75" No- 12,078.0 12,177.0 16:00 17:00 Go, 1 it 4W TXP, SBE, hanger and packer assembly to 12,177'. M/U PER packoff sub and attempt to sting into SBE, would not go due slip deformation on SBE. Re-position and re-attempt, no-go. 7/19/2017 7/19/2017 1.50 COMPZN CASING PUTS T Lay down ZXP and liner hanger, M/U 12,177.0 12,177.0 17:00 18:30 SBE in mousehole. Made up ported ball seal sub and PBR packoff sub io packer, then to SBE in mousehole. WU Flex lock liner hanger and ZXP liner top packer to SBE, then M/U to tubing string. 7/19/2017 7/19/2017 0.25 COMPZN CASING OTHR P Mix and fill tie-back with ZanPlex 12,177.0 12,177.0 18:30 18:45 7/19/2017 7/19/2017 0.25 COMPZN CASING PUTS P M/U bumper sub and XO to XT-39, 12,177.0 12,291.0 18:45 19:00 RIH with 1 stand 4" 14# DP to 12,291' MD. 7/19/2017 7/1912017 __7N CASING CIRC P Establish circulation through tools, 1 12,291.0 12,291.0 19:00 19:30 bpm 70 psi. Obtain parameters P/U=151k, S/0=112k, ROT=124k, 10 & 20 rpm=3.7k To. 7/19/2017 7/19/2017 1.50 COMPZN CASING RUNL P RIH with from 12,291' MD to 14,845' 12,291.0 14,845.0 19:30 21:00 MD on 4" 14# DP. Page 25/30 Report Printed: 8/1612017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Our (hr) Phase op Code AcWv CodaTime P -T-% Operation start Depen (7tKa) EM Depth (WS) 7/19/2017 7/19/2017 0.25 COMPZN CASING CIRC P Obtain parameters again @ 14,845'. 14,845.0 14,845.0 21:00 21:15 P/U=166k, S/0=124k, ROT= 139k. 4.3k Tq @ 10 and 20 rpm, 1 bpm 80 psi. P/U and SIO unchanged with pumps on. 7/19/2017 7/19/2017 0.25 COMPZN CASING CIRC P R/U headpin to circulate while P/U 14,845.0 14,845.0 21:15 21:30 HWDP. Establish circulation @ 3 bpm, 240-250 psi. 7/19/2017 7/20/2017 2.50 COMPZN CASING PULD P P/U and rack back 20 stands 4" 14,845.0 14,845.0 21:30 00:00 HWDP, SIMOPS CBU @ 3 bpm 240- 250 psi. OA pressure @ 23:00 hrs=240 psi 7/20/2017 7/20/2017 0.50 COMPZN CASING RURD P Rig down 1502 circulating equiipment, 14,845.0 14,845.0 00:00 00:30 clean and clear form P/U HWDP. Observe well static. 7/20/2017 7/20/2017 9.25 COMPZN CASING RUNL P Continue RIH with liner on 4" 14,845.0 27,000.0 00:30 09:45 DP/HWDP from 14,845'MD to 27,000' MD setting depth, topping off pipe every 20 stands. Total trip in Calc Displacement=144.2 bbl, Actual Displacement=123.5 bbl. 7/20/2017 7/20/2017 0.25 COMPZN CASING HOSO P P/U and observe bumper sub @ 215k. 27,000.0 27,000.0 09:45 10:00 P/U= 2451k, S/0=130k. Park string in tension at setting depth. 7/20/2017 7/20/2017 2.00 COMPZN CASING CIRC P Circulate @ 3 bpm, 660 psi (CBU 27,000.0 27,000.0 10:00 12:00 checking for gas) none observed. OA pressure @ 11:00 hrs= 0 psi 7/20/2017 7/20/2017 0.75 COMPZN CASING CIRC P Continue circulate @ 3 bpm, 640 psi 27,000.0 27,000.0 12:00 12:45 (CBU checking for gas), no gas observed @ bottoms up. 7/20/2017 7/20/2017 1.25 COMPZN CASING PACK P Drop 1.625" ball and pump down @ 3 27,000.0 14,857.0 12:45 14:00 bpm, 630 psi. Ball on seat @ 1207 stks. Pressure up to 2500 psi, slack off to 60k setting liner hanger. Pressure up to 4000 psi for 5 minutes, bleed pressure. P/U to 215k, pull up 6.5'. Rotate 14 rpm 6.6k Tq. ROT=185k, Set down with rotation to 100k, observe shear @ 155k setting ZXP. P/U to 215k. 7/20/2017 7/20/2017 0.50 COMPZN CASING PRTS P Rig up and test annulus to 2500 psi for 14,857.0 14,857.0 14:00 14:30 10 minutes, confirming packer set. Bleed off and blow down. 7/20/2017 7/20/2017 0.25 COMPZN WELLPR PMPO P Pump out from 14,857' MD to 14,737' 14,857.0 14,737.0 14:30 1445 MD @ 2 bpm, 290 psi. 7/20/2017 7/20/2017 1.00 COMPZN WELLPR SI -PC P PJSM, Cut and slip 112' drilling line. 14,737.0 14,737.0 14:45 15:45 7/20/2017 7/20/2017 0.50 COMPZN WELLPR SVRG P Service top drive, drawworks and iron 14,737.0 14,737.0 15:45 16:15 roughneck. 7/20/2017 7/20/2017 0.25 COMPZN WELLPR CIRC P Continue pump BU @ 6 bpm, 1630 14,737.0 14,737.0 16:15 16:30 psi. Observe light cuttings load coming over shakers and foamed up Vis Brine, no gas observed or read. 7/20/2017 7/20/2017 0.50 COMPZN WELLPR OWFF P Monitor well for Flow, slight Flow, 14,737.0 14,737.0 16:30 17:00 mostly foam. Diminishing. 7/20/2017 7/20/2017 0.25 COMPZN WELLPR CIRC P Circulate another 50 bbl to dear 14,737.0 14,737.0 17:00 17:15 foam / aired up brine @ 3 bpm, 520 psi. Page 26/30 ReportPrinted: 8116/2017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan Time End Time Dur (hr) Phase op ode Activity Code TimePT -X Operation Start Depth We) EM Depm(RKB) 7/20/2017 7/20/2017 1.25 COMPZN WELLPR OWFF P Fow check well until static 30 minutes. 14,737.0 14,737.0 17:15 18:30 Pump off @ 17:19, slight flow diminishing to static @ 17:56. Monitor static for 30 minutes. 7/20/2017 7/20/2017 2.50 COMPZN WELLPR PMPO P Pump out 20 stands from 14,737' MD 14,737.0 12,896.0 18:30 21:00 to 12,896' MD to offset swab @ 2 bpm, 220-250 psi. Blow down topdrive. 7/20/2017 7/21/2017 3.00 COMPZN WELLPR TRIP P POOH on trip tank from 12,896' MD to 12,896.0 9,189.0 21:00 00:00 9,189' MD. Good hole fill, 3 bbl/5 stands. OA pressure @ 23:00 hrs= 75 psi. 7/21/2017 7/21/2017 4.00 COMPZN WELLPR TRIP P POOH on elevators / Trip Tank from 9,189.0 1,205.0 00:00 04:00 9,189' MD to 1,205' MD racking 4" DP in derrick slowly speeding up from 4,000 fph to 10,000 fph. Good hole fill. 7/21/2017 7/21/2017 1.25 COMPZN WELLPR PULD P Continue POOH, laying down 12 1,205.0 132.0 04:00 05:15 stands 4" DP to pipe shed from 1,205' MD to Baker running tools. Total run Calc Fill= 81 bbl, Actual Fill= 82 bbl. OWFF observe slight drop in annulus @ 132' MD. 7/21/2017 7/21/2017 0.50 COMPZN WELLPR BHAH P Lay down Baker liner running tools, 132.0 0.0 05:15 05:45 bumber sub and XO. 7/21/2017 7/21/2017 0.25 COMPZN WELLPR BOPE P Function Upper and lower 3V x 6" 0.0 0.0 05:45 06:00 VBR's, blind rams and annular, IAW BLM Onshore Oil and Gas order No. 2. 7/21/2017 7/21/2017 0.25 COMPZN WELLPR BHAH P Clean and Gear dg floor. 0.0 0.0 06:00 06:15 , 7/2112017 7/21/2017 0.50 COMPZN RPCOMP TURD T7_ FMC pull 7.125" ID wear ring, orient 0.0 0.0 06:15 06:45 and set 9" ID thin wall retrievable wear ring 7121/2017 7/21/2017 2.00 COMPZN RPCOMP RURD P P/U and R/U tubing tools and I -Wire 0.0 0.0 06:45 08:45 tools and equipment. Stiock up cannon clamps, I -Wire spool, sheave, double stack power tongs, tubing hanger. Monitor well on trip tank, .25 bph loss. 7/21/2017 7/21/2017 0.25 COMPZN RPCOMP SFTY P PJSM on P/U and run completion with 0.0 0.0 08:45 09:00 DDI crew, CPAI, DDI casing, SLB/Camco and Baker completion. Discuss running order, procedure, hazards and mitigations. 7/21/2017 7/21/2017 1.50 COMPZN RPCOMP PUTB P P/U Baker seal easy, locator sub, 32 0.0 1,388.0 09:00 10:30 its 4Yx" TXP tubing, 3.813" landing nipple with RHC plug installed, 1 Jt TXP to 1,388' MD. 7/21/2017 7/21/2017 1.00 COMPZN RPCOMP PUTB P M/U SLB/Camco solid gauge mandrel 1,388.0 1,414.0 10:30 11:30 with encapsulated I -Wire. Terminate I - Wire and test connection to 5k psi 7/21/2017 7/21/2017 0.50 COMPZN RPCOMP PUTB P Continue RIH with 4%" TXP tubing 1,414.0 1,576.0 11:30 12:00 completion from 1,414' MD to 1,576' MD per detail, installing Cannon clamps on each connection. (37 its in hole) P/U and S/O= 77k. OA pressure @ 12:00 hrs= 0 psi. ' Page 27130 ReportPrinted: 811 612 01 7 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start time End Time Dw (hq Phase op Coda Activity Code Time P -T -X ops Start Depth(rt KB) EM Depth (NKB) 7/21/2017 7/22/2017 12.00 COMPZN RPCOMP PUTB P Continue RIH with 4%" TXP tubing 1,576.0 11,649.0 12:00 00:00 completion from 1,576' MD to 11,649' MD per detail, installing Cannon clamps on each connection. (285 jts in hole) S/0= 110k. OA pressure @ 23:00 hrs= 0 psi. 7/22/2017 7/22/2017 4.00 COMPZN RPCOMP PUTB P P/U and run 4Y2" TXP completion with 11,649.0 14,777.0 00:00 04:00 I -Wire per detail from 11,649' MD to 14,777' MD, installing Cannon damps over every coupler. P/U=160k, S/0=115k. 7/22/2017 7/22/2017 1.25 COMPZN RPCOMP HOSO P Wash down @ 1 & 2 bpm to observe 14,777.0 14,839.0 04:00 05:15 seals engage. 2 bpm, 210 psi, observe seals entering packer body, pressure increased to 300 psi but still good return flow 34%. Reduce to 1 bpm, 160 psi then observe seals enter seal bore @ 14,839' MD pressure increase to 420 psi and flow out drop from 24% to 8%. Pump off and open bleeders. 7/22/2017 7/22/2017 0.50 COMPZN RPCOMP HOSO P Slack off and no-go out with 10k @ 14,839.0 14,861.0 05:15 05:45 14,871' MD seal depth. P/U and repeat to confirm. P/U=160k, S/0=15k. P/U 10'. 7/22/2017 7/22/2017 0.25 COMPZN RPCOMP HOSO P Close annular, pump down kill line to 14,861.0 14,861.0 05:45 06:00 pressure test and confirm seals engaged @ 500 psi- Holding. 7/22/2017 7/22/2017 0.25 COMPZN RPCOMP HOSO P POOH to 14,777' MD laying down 14,861.0 14,777.0 06:00 06:15 #366, 365 and 364. 7/22/2017 7/22/2017 0.25 COMPZN RPCOMP HOSO P M/U space out pups 5.85' and 3.86'. 14,777.0 14,786.0 06:15 06:30 7/22/2017 7/22/2017 0.50 COMPZN RPCOMP RURD P M/U landing joint B, BOLDS and pull 14,786.0 14,786.0 06:30 07:00 thin wall wear ring per FMC. 7/22/2017 7/22/2017 0.25 COMPZN RPCOMP THGR P Make up jt #364 and hanger I pup. 14,786.0 14,828.0 07:00 07:15 Align production port. 7/22/2017 7/22/2017 1.00 COMPZN RPCOMP THGR P FMC and SLB/Camoo terminate I -wire 14,828.0 14,828.0 07:15 08:15 to hanger. Test wire - good. FMC test swage lock connection to 5000 psi - good. SIMOPS- Clean and clear rig floor, OWFF slight drop in annulus. 7/22/2017 7/22/2017 0.50 COMPZN RPCOMP CIRC P Establish circulation @ 2 bpm, 250 14,828.0 14,828.0 08:15 08:45 psi. Observe nose seal leaking on landing joint A through production port. Change out nose seal, circulate again no leaks. 7/22/2017 7/22/2017 1.75 COMPZN RPCOMP CRIH P Pump 56.5 bbl 11.9 ppg Corrosion 14,828.0 14,828.0 08:45 10:30 inhibited brine @ 3 bpm 360 psi. Chase with 219 bbl 11.9 Viso brine @ 3 bpm, 330-360 psi. SIMOPS- Rig down and lay down power longs, I -Wire sheave in derrick. Clean out pollution pan and flow box for N/D and rig move. 7/22/2017 7/22/2017 0.25 COMPZN RPCOMP RURD P Drain slack, blow down choke and kill 14,828.01 14,828.0 10:30 10:45 lines, hole fill and bleeder lines. 7122/2017 7/22/2017 0.25 COMPZN RPCOMP HOSO P RIH and land tubing on hanger @ 14,828.0 14,871.0 10:45 11:00 14,869.68' MD shoe depth, 2.21' off fully located. Total 364 jts in hole, 329 full Cannon clamps, 8 Halt clamps, 2 SS bands. Page 28130 Report Printed: 8116/2017 Operations Summary (with Timelog Depths) CD5-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Sgrl Time End Imre Der(hr) Phese Op Code ACliviy Cotle Time P -T -X Gpera iM Start Depth MKa) End Depth (fi") 7/22/2017 7/22/2017 1.00 COMPZN RPCOMP THGR P FMC RILDS, SIMOPS- R/U test 14,871.0 14,871.0 11:00 12:00 equipment, prep 1502 circ equipment for tubing/ IA test and shear out SOV. OA pressure @ 12:00 hrs= 0 psi 7122/2017 7/22/2017 0.50 COMPZN RPCOMP THGR P Test hanger seals to 250/5000 psi for 14,871.0 14,871.0 12:00 12:30 10 minutes CPAI witnessed. Drop 1.875" OD ball and rod w/rollers. Rod length= 9.23'. FN 1.375"11.20". 7/22/2017 712212017 2.50 COMPZN RPCOMP PRTS P R/U and test tubing / IA. PT lines to 14,871.0 14,871.0 12:30 15:00 3500 psi. Prssure up tubing to 500 psi for 5 minutes, increase to 3000 psi for 30 minutes charted. Bleed down tubing to 1500 psi, pressure test IA to 2500 psi for 30 minutes charted. OA pressure cimbed to 350 psi holding, Bleed off IA and tubing. 7/22/2017 7/22/2017 0.50 COMPZN RPCOMP PRTS P With tubing open, pressure up IA to 14,871.0 14,871.0 15:00 15:30 2600 psi to shear out SOV. Bleed down and repeal, observe shear out on third attempt. Circulate freely up. tubing @ 1 bpm 350 psi. 7/22/2017 7/22/2017 0.50 COMPZN RPCOMP OWFF P OWFF static. SIMOPS- Blow down 14,871.0 14,871.0 15:30 16:00 and dg down lines, 7/22/2017 7/22/2017 1.00 COMPZN WHOBOP MPSP P UD landing joint A, FMC install type 14,871.0 0.0 16:00 17:00 HP BPV. RIU landing joint B, test BPV in direction of flow 2500 psi for 15 minutes. UD landing joint B. Verify barriers in place. 7/22/2017 7/2212017 2.00 COMPZN WHDBOP WWWH P R/U stack washer and flush BOP 0.0 0.0 17:00 19:00 stack, blow down top drive. Drain stack. SIMOPS- Lay down spooler and equipment from rig floor. 7/22/2017 7/22/2017 1.00 COMPZN WHDBOP MPDA P PJSM, N/D MPDE, flow box, trip 0.0 0.0 19:00 20:00 nipple, Orbit valve and 1502 equipment. 7/22/2017 7122/2017 1.00 COMPZN WHDBOP NUND P Nipple down BOPE stack, remove kill 0.0 0.0 20:00 21:00 line. 7/22/2017 7/22/2017 1.00 COMPZN WHDBOP NUND P Prep wellhead for tree install. 0.0 0.0 21:00 22:00 Terminate I -wire and commision test for downhole gauge, 4390 psi, 152°F. 7/22/2017 7/2212017 1.00 COMPZN WHDBOP NUND P NIU tree, pressure lest tree adapter 0.0 0.0 22:00 23:00 flange to 5000 psi fr 10 minutes CPAI witnessed - good. 7/22/2017 7/23/2017 1.00 COMPZN WHDBOP PRTS P Fill tree with diesel, pressure up to 500 0.0 0.0 23:00 00:00 psi and cycle valves to fill voids. Pressure test tree to 250/5000 psi for 10 minutes each charted. 7/23/2017 7/2312017 0.25 COMPZN WHDBOP PRTS P Continue pressure testing tree to 5000 0.0 0.0 00:00 00:15 psi for 10 minutes charted. Rig down test equipment. 7/23/2017 7123/2017 0.25 COMPZN WHDBOP MPSP P FMC pull test dart from HP BPV 0.0 0.0 00:15 00:30 7/23/2017 7/23/2017 1.00 DEMOB MOVE RURD P Clean and dear rig floor, install 0.0 0.0 00:30 01:30 mousehole and drain lines in mezzanine for laying down drill pipe. 7/23/2017 7/2312017 10.50 DEMOB MOVE PULD P Lay down 113 stands 4" DP via 30' 0.0 0.0 01:30 12:00 mousehole. Cull out 91 joints 14# DP for hardbanding. Page 29130 ReportPrinted: 8/16120171 Operations Summary (with Timelog uepths) Art, 1WCDS-314X Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Btatl Time End Time our (hr) Phase Op Code Acbvity Cotle Time P -T -X operation Start Depth (ftKB) End Depen (flKB) 7/23/2017 7/24/2017 12.00 DEMOB MOVE PULD P Continue UD 4" DP, 14# and 15.7#, 0.0 0.0 12:00 0000 138 stands. Prep for ng move. 7/24/2017 7/24/2017 6.75 DEMOB MOVE PULD P Continue 10 4" DP and HWDP (60jts 0.0 0.0 00:00 0645 total). Culi out 3 jts HWDP. SIMOPS- Move Ball Mill away @ 00:45 hrs. 7/24/2017 7/24/2017 0.50 DEMOB MOVE TURD P Pull and UD mousehole. RID and UD 0.0 0.0 06:45 07:15 4" DP elevators. P/U and RIC 5"DP elevators. 7/24/2017 7/24/2017 2.25 DEMOB MOVE RURD P Work on rig move checklist. 0.0 0.0 07:15 09:30 Disconnect service lines in pits / sub innerconnect. SIMOPS- PJSM, C/O saver sub from 4"XT39 to 4'/:" NC50 while on generator power. UD 4" subs and equipment, P/U 5" subs... P/U BHA tools/ equipment for CD5-316' surface. RID and move safe house, site control shack and pipe shed @ 08:30 hrs. Blow down water @ 07:30, steam @ 08:00 hrs. Warm up sub genset @ 08:00 for rif move. SIMOPS- C/O pipe shed bridge crane. 7/24/2017 7/24/2017 0.50 DEMOB MOVE RURD P PJSM, continue rig move checklist. 0.0 0.0 09:30 1000 Disconnect choke / flare lines, remove all grating from exterior stairways and jack up stairs for move. Electrician swap to cold start genets @ 09:30. De -energize topdrive and SCR's. Rig down power cables @ pit/sub innerconnect. Rig released @ 10:00 his. Page 30130 ReportPrinted: 8/16/2017 NADConversion Western North Slope CD5 Alpine West Pad CD5-314X CD5-314X Definitive Survey Report 07 August, 2017 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Weil: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 project Western North Slope, North Slope Alaska, United States Nap System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Seo Datum: NAD 1927 (NADCON CONES) Using Well Reference Point Asia Zone: Alaska Zone 04 Using geodetic scale factor well CDS-314X Audit Notes: Nell Position +N/ -S 0.00 usft Northing: 5,965,843.98 usft Latitude: 70° 18'49.610 r ACTUAL +E/ -W 0.00 usft Easting: 349,284.20 usft Longitude: 151' 13'17.464V resition Uncertainty Direction 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 33.80 usfl Welibors CD5-314X Magnetics Model Name Sample Data Declination Dip Angle Field Strength (1) (`) (nT) BGGM2017 6/20/2017 17.12 80.79 57,456.57 Design CD5-314X Data Audit Notes: TO Version: 1.0 Phase: ACTUAL Tie On Depth: 36.55 Vertical Section: Depth From (TVD) +N/ -S +EbW Direction 1,40206 (usft) (usft) (usft) (') 2,344.40 36.55 0.00 0.00 172.00 rvey Program Data From TO (usft) (usft) Survey (Wellbore) Too) Name Description Survey Date 111.48 1,349.79 CD5-314X Srvy 1 - SLB GWD70 (CD5-31 GYD-GCSS Gymdata gyro single shots 6/11/2017 9:42:1 1,40206 2,246.17 CD5.314X Srvy 2-SLB_MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 6/12/201711:03: 2,344.40 14,923.09 CD5-314X Srvy 3- SLB _W MD+GMAG(C MWD+IFR-AK-CAZ-SC MWrD+IFRAKCAZSCC 6/16/2017 9:57:• 14,986.00 17,756.16 CD5-314X Srvy 4- SLB _MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 7/4/2017 1:510 17,855.40 21,285.51 CD5-314X Srvy 5-SLB_MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 7/9/2017 10:110 21,380.19 26,950.13 CD5-314X Srvy 6 -SLB MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 7/13/2017 8:32> Survey Map Map vertical MD Inc Ai TVD TVDSS +NIS +EI -W Northing Easting DLS Section (usft) (1) (1) (usft) (usft) (usft) (usft) (ft) (ft) (o/100) (ft) Survey Tool Name 36.55 0.00 0.00 36.55 -33.80 0.00 0,00 5,965,843.98 349,284.20 0.00 0.00 UNDEFINED 11148 0.24 34.23 11148 41.13 DA3 OD9 5,965,844.11 349,284.29 0.32 -0.12 GYD-GC-SS(1) 14544 0.11 103.81 145.44 75.09 0.18 0.16 5,965,844.16 349,284.36 0.67 -0.16 GYD-GC-SS(1) 155.56 0.18 100.03 155.55 86.21 0.18 0.19 5,965,844.15 349,284.39 0.64 -015 GYD-GC-SS(1) 202.73 0.32 143.31 202.73 132.38 0.06 0.34 5,985,844.03 349,284.54 0.49 -0.01 GYD-GC-SS(1) 270.48 0.93 163.46 27047 200.12 4.62 0.61 5,965,843.35 349,284.79 0.94 0.70 GYD-GC-SS(1) 294.91 1.11 166.61 294.90 224.55 -104 0.72 5,965,842.92 349,284.90 0.77 1.13 GYD-GCSS(1) 344.62 2.14 169.36 344.59 274.24 -2.42 1.00 5,965,841.54 349,285.15 2.08 2.54 GYD-GCSS(1) 386,65 2.17 169.72 386.59 316.24 3.97 1.29 5,965,839.98 349,285.41 0.08 4.12 GYD-GCSS(1) 435.06 2.37 173.43 434.96 36461 -5.87 1.56 5,965,838.08 349,26565 0.51 6.03 GYD-GC-SS(1) 8/72017 9:21: 16AM Page 2 COMPASS 5000 14 Build 85 ConocoPhillips Definitive Survey Report company-, NADConversion Local Co-ordinate Reference: Well CD5-314X Project Western Norm Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) site: CD5 Alpine West Pad MD Reference: CDS-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method; Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey Map Map Vertical MD Inc An TVD TVDSS -N/-S +Ei-W Northing Easting US Section (usft) (1) (') (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 477.89 2.38 179.28 47776 407.41 -7.64 168 5,965,836.31 349,285.72 0.57 7.80 GYD-GC-SS(1) 566.27 3.73 183.66 5WAl 49566 42.34 1.52 5,965,831.61 349,285.47 1.55 12.43 GYD-GC-SS(1) 600.44 3.85 185.16 600.10 529.75 -14.60 1.34 5,965,829.36 349,285.25 0.46 1464 GYD-GC-SS(1) 692.95 5.12 188.02 692.33 621.98 -21.78 0.49 5,955,822.20 349,284.25 1.39 21.63 GYD-GCSS(1) 784.97 7.27 19227 783.81 713.46 -31.53 -1.32 5,965,812.48 349,28225 2.39 31,04 GYD-GC-SS(1) 879.53 11.46 194.22 877.09 806.74 -46.49 4.90 5,965,797.60 349,278.37 4.44 45.36 GYD-GC-SS(1) 973.03 1366 194.89 968.34 897.99 56.17 -10.02 5,965,778.03 349,272.85 2.36 64.13 GYD-GCSS(1) 1,067.15 15.21 194.29 1,059.49 989.14 58.87 -15.93 5,965,755.45 349,266.49 1.65 85.79 GYD-GCSS(1) 1,160.80 17.19 19,te5 1,149.42 1,079.07 -114.17 -22.46 5,965,730.29 349,259.46 2.12 109.93 GYD-GC-SS(1) 1,255.33 19.29 194.86 1,239.19 1,168.84 -142.78 -30.00 5,965,701.84 349,251.35 2.22 137.22 GYD-GC-SS(1) 1,34979 20.36 195.24 1,328.05 1,25770 -173.72 -38.32 5,965,671.08 349,242.41 1.14 166.69 GYD-GC-SS(1) 1,407.06 20.54 195.34 1,381.71 1,311.36 -193.02 -03.60 5.965,651.89 349,236.74 0.32 185.07 MWD+IFR-AK-CAZ-SC (2) 1,501.99 21.71 195.09 1,47026 1,399.91 -226.03 52.57 5,965,619.07 349,227.11 1.24 216.51 MWD+IFR-AK-CAZ-SC(2) 1,595.51 23.90 191.34 1,556.47 1,486.12 -261.31 50.80 5,965,583.96 349,218.17 2.81 250.31 MWD+IFR-AK-CAZSC(2) 1,689.65 25.79 190.74 1,641.89 1,571.54 -300.13 58.37 5,965,545.30 349,209.83 2.03 287.70 MWD+IFR-AK-CAZSC(2) 1,78400 27.43 191.94 1,726.25 1,655.90 -341.56 -76.89 5,965,504.05 349,200.68 1.83 327.57 MWD+IFR-AK-CAZ-SC(2) 1,876.64 28.61 193.03 1,808.03 1,737.68 584.05 56.11 5,965,461.76 349,190.41 1+39 368.33 MWD+IFR-AK-CAZSC(2) 1,971.00 31.08 195.78 1,889.87 1,819.52 -429.51 -97.83 5,965,416.55 $49,177.78 2.99 411.71 MWD+IFR-AK-CAZSC(2) 2,064.35 31.36 196.63 1,969.70 1,899.35 -475.97 -111.33 5,965,370.37 349,163.35 0.56 455.84 MWD+IFR-AK-CAZ-SC(2) 2,159.16 3381 199.72 2,049.59 1,979.24 -524.45 -127.29 5,965,322.23 349,146.42 3.12 50163 MWD+IFR-AK-CAZ-SC(2) 2,246.17 34.31 201.65 2,121.67 2,051.32 -570.03 -144.51 5,965,277.00 349,128.29 1.37 544.37 MWD+IFR-AK-CAZ-SC(2) 2,321.00 35.72 202.20 2,182.96 2,112.61 509.86 -160.54 5,965,23251 349,111A6 1.93 581.58 NOT an Actual Survey 10.3/4" a 13.1/2" - 2,344.40 36.16 202.36 2,201.90 2,131.55 522.57 -165.75 5,965,224.91 349,106.00 1.93 593.44 MWD+IFR-AK-CAZ-SC(3) 2,442.03 39.57 202.34 2,278.97 2,203.62 -67799 -188.53 5,965,169.96 349,082.11 3.49 645.15 MWD+IFR-AK-CAZ-SC(3) 2,537.54 42.30 202.65 2,351.11 2,280.76 -735.60 -212.48 5,965,112.65 349,057.01 2.87 699.06 MWD+IFR-AK-CAZSC(3) 2,633.38 44.93 203.11 2,420.49 2,350.14 -796.70 -238.19 5,965,052.28 349,030.09 2.76 755.79 MWD+IFR-AK-CAZSC(3) 2,727.28 48.07 203.85 2,485.12 2,414.77 559.16 -265.33 5,964,990.38 349,001.70 3.39 813.87 MWD+IFR-AK�WSC(3) 2,821.17 50.92 204.94 2,546.10 2,475.75 -924.16 -294.83 5,964,925.99 348,970.91 3.16 874.13 MWD+IFR-AK-CAZ-SC(3) 2,91506 53.39 206.40 2,603.70 2,533.35 -990.97 -326.95 5,964,859.85 348,937.45 2.90 935.82 MWD+IFR-AK-CAZ-SC(3) 3,008.79 56.10 206.73 2,657.80 2,587.45 -1,059.42 -361.18 5,9 ,792.10 348,901.85 2.91 998.84 MWD+IFR-AK-CAZ-SC(3) 3,102.56 58.34 207.84 2,708.57 2,638.22 -1,129.47 -397.33 5,964,722.79 348,864.31 2.59 1,063.18 MWD+IFR-AK-CAZ-SC(3) 3,196.75 60.72 209.01 2,756.33 2,685.98 -1,200.86 -435.98 5,964,652.20 348,824.24 2.74 1,128.49 MWD+IFR-AK-CAZ-SC(3) 3,289.83 63.27 210.79 2,800.03 2,72968 -1,272.08 -476.95 5,964,581.82 348,781.85 3.22 1,193.32 MWD+IFR-AK-CAZSC(3) 3,385.90 64.78 212,03 2,842.11 2,771.76 -1,345.76 -521.96 5,964,509.04 348,735.37 1.95 1,260.04 MWD+IFR-AK-CAZSC(3) 3,480.68 65.27 212.64 2,882.13 2,811.78 -1,418.38 567.92 5,964,437.39 348,687.97 0.78 1,325.53 MWD+IFR-AK-CAZ-SC(3) 3,574,83 65.31 21348 2,921.48 2,851.13 -1,490.06 514.58 5,964,36667 348,639.89 0.81 1,39002 MWD+IFR-AK-CAZ-SC(3) 3,66994 65.27 214.49 2,961.24 2,890.89 -1,561.70 562.87 5,954,296.01 348,590.17 0.97 1,454.25 MWD+IFR-AK-CAZ-SC(3) 3,763.34 65.34 214.69 3,000.27 2,929.92 -1,631.56 -711.05 5,964,227.14 348,540.60 0.21 1,516.72 MWD+IFR-AK-CAZSC(3) 3,857.31 6527 213.48 3,039.53 2,969.18 -1,702.26 -758.89 5,9 ,157.42 348,491.35 1.17 1,580.08 MWD+IFR-AK-CAZSC(3) 8/72017 9.21:16AM Page 3 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Project: Western North Slope TVD Reference: Site: CD5 Alpine West Pad MD Reference: Well: CD5-314X North Reference: Wellbore: CD5-314X Survey Calculation Method: Design: CD5-314X Database: Well CD5-314X CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) True Minimum Curvature 0AKEDMP2 Survey Map Map Vertical MD Inc AN TVD TVDSS +N/S +E/ -W Northing Easting DSS Section (usft) (% (7) (usft) (usft) (usft) (usft) (ft) Ift) (°/100') (ft) Survey Tool Name 3,951.97 65.20 212.48 3,079.18 3,008.83 -1,774.37 505.68 5,964086.27 348,443.13 0.96 1,644.97 MWD+IFR-AK-CAZ-SC(3) 4,041.97 65.30 212.54 3,116.86 3,046.51 -1,843.29 549.61 5,964,01825 348,397.83 0.13 1,707.11 MWD+IFR-AK-CAZ-SG(3) 4,136.11 65.34 212.15 3,156.17 3,085.82 -1,915.56 595.37 5,963,946.92 348,350.63 0.38 1,772.31 MWD+IFR-AK-CAZSC(3) 4,230.59 64.78 211.07 3,196.01 3,125.66 -1,988.52 -940.27 5,963,874.88 348,304.27 1.19 1,838.30 MWD+IFR-AK-CAZSC(3) 4,324.59 64.89 211.00 3,235.98 3,16563 -2,061.42 -984.14 5,963,802.88 348,258.96 0.14 1,904.39 MWD+IFR-AK-CAZSC(3) 4,416.67 64.76 210.53 3,275.15 3,204.80 -2,133.02 -1,026.76 5,953,732.15 348,214.91 0.48 1,969.37 MWD+IFR-AK-CAZ-SC(3) 4,510.75 64.83 209.88 3,315.21 3,2".86 -2,206.59 -1,069.59 5,963,659.47 348,170.62 0.63 2,036.25 MWD+IFR-AK-CAZ-SC(3) 4,605.09 64.73 210.16 3,355.41 3,285.06 -2,280.49 -1,112.29 5,963,586.45 348,126.45 029 2,103.49 MWD+IFR-AK-CAZSC(3) 4,699.43 64.77 209.78 3,395.65 3,325.30 -2,354.40 -1,154.91 5,963,513.41 348,082.35 0.37 2,170.76 MWD+IFR-AK-CAZSC(3) 4,794.30 64.82 208.77 3,436.06 3,365.71 -2,429.28 -1,196.89 5,963,439.40 348,038.89 0.96 2,239.06 MWD+IFR-AK-CAZ-SC(3) 4,888.22 64.83 207.77 3,476.01 3,405.66 -2,504.13 -1,237.14 5,963,365.37 347,99714 0.96 2,307.59 MWD+IFR-AK-CAZ-SC(3) 4,982.97 6468 207.03 3,516.42 3,446.07 -2,580.22 -1,276.58 5,963,290.09 347,956.18 0.72 2,377.44 MWD+IFR-AK-CAZ-SC(3) 5,077.52 64.24 207." 3,557.18 3,486.83 -2,656.07 -1,31562 5,963,21504 347,915.63 0.61 2,447.12 MWD+IFR-AK-CAZSC(3) 5,170.99 64.22 20895 3,597.82 3,527.47 -2,730.26 -1,355.39 5,963,141.68 347,874.38 1.45 2,515.05 MWD+IFR-AK-CAZSC(3) 5,265.57 64.09 208.60 3,639.05 3,5WJ0 -2,804.87 -1,396.37 5,963,067.91 347,831.92 0.36 2,563.23 MWD+IFR-AK-CAZ-SC(3) 5,360." 64.26 207.72 3,680.38 3,610.03 -2,880.15 -1,436.67 5,962,993.46 347,790.12 0.85 2,652.18 MWD+IFR-AK-CAZ-SC (3) 5,454.65 64.32 207.67 3,721.25 3,650.90 -2,955.31 -1,476.12 5,962,919.11 347,749.17 0.08 2,721.11 MWD+IFR-AK-CAZ-SC(3) 5,54609 64.38 207.83 3,760.83 3,690.48 5,028.26 -1,514.50 5,962,846.95 347,709.34 0.17 2,788.01 MWD+IFR-AK-CAZSC(3) 5,643.94 64.38 208.35 3,80514 3,732.79 -3,106.10 -1,556.04 5,962,769.97 347,666.25 0.48 2,859.31 MWD+IFR-AK-WSC(3) 5,738.52 64.41 208.62 3,844.02 3,773.67 -3,181.06 -1,596.72 5,962,69584 347,624.07 0.26 2,927.88 MWD+IFR-AK-CAZ-SC(3) 5,831.97 64.35 209.89 3,884.43 3,814.08 5,254.57 -1,637.90 5,962,623.18 347,581.43 1.23 2,994.95 MWD+IFR-AK-CAZ-SC(3) 5,926.29 6442 211.94 3,925.21 3,854.86 5,327.59 -1,681.59 5,962,551.11 347,536.29 1.% 3,061.12 MWD+IFR-AK-CAZSC(3) 6,020.35 6438 21377 3,965.85 3,895.50 5,398.79 -1,727.61 5,962,480.80 347,488.85 1.76 3,125.28 MWD+IFR-AK-CAZSC(3) 6,114.75 64.39 215.05 4,006.67 3,936.32 5,469.02 -1,775.71 5,962,411.56 347,439.36 1.22 3,188.12 MWD+IFR-AK-CAZSC(3) 6,209.37 64.28 21523 4,04765 3,977.30 5,538.76 -1,824.80 5,962,342.82 347,388.88 0.21 3,250.36 MWD+IFR-AK-CAZSC(3) 6,303.42 64.32 214.47 4,088.43 4,018.08 -3,608.30 -1,873.22 5,962,274.27 347,339.07 0.73 3,31249 MWDHFR-AK-CAZ-SC(3) 6,398.07 64.29 213.47 4,129.47 4,059.12 5,679.04 -1,920.88 5,962,204.51 347,290.01 0.95 3,375.90 MWD+IFR-AK-CAZ-SC(3) 6,492.00 64.29 212.80 4,170.22 4,099.87 5,749.90 -1,967.14 5,962,134.59 347,242.34 0.64 3,439.64 MWD+IFR-AK-CAZ-SC(3) 6,586.12 64.26 211.74 4,211.07 4,140.72 5,821.60 -2,01241 5,962,063.83 347,19564 1.02 3,504.33 MWD+IFR-AK-CAZ-SC(3) 6,677.13 64.26 210.32 4,25060 4,180.25 5,891.84 -2,054.67 5,961,994.45 347,151.99 1.41 3,568.01 MWD+IFR-AK-CAZ-SC(3) 6,772.15 64.30 209.96 4,291.84 4,221.49 5,965.88 -2,097.65 5,961,921.30 347,107.53 0.34 3,635.34 MWD+IFR-AKCAZ-SC (3) 6,866.80 64.35 210.74 4,332.85 4,262.50 4,039.49 -2,140.75 5,961,848.57 397,062.96 0.74 3,702.24 MWD+IFR-AK-CAZSC(3) 6,960.12 64.29 210.32 4,37329 4,302.94 4,111.93 -2,183.48 5,951,777.01 347,018.80 0.41 3,768.03 MWD+IFR-AK-CAZSC(3) 7,055.03 64.25 209.34 4,414.49 4,344.14 4186.10 -2,226.00 5,961,703.71 346,074.79 0.93 3,635.56 MWD+IFR-AK-CAZSC(3) 7,149.46 64.35 208.10 4,455." 4,385.09 4,250.72 -2,266.89 5,961,629.93 346,932.42 1.19 3,903.77 MWD+IFR-AKCAZ-SC(3) 7,242.82 64.38 207.48 4,495.83 4,425.48 4,335.18 -2,306.13 5,961,556.28 346,891.69 0.60 3,972.04 MWD+IFR-AKCAZ-SC (3) 7,337.74 64.34 206.91 4,536.91 4,466.56 4411.30 -2,345.24 5,961,480.97 346,851.06 0.54 4,041.97 MWD+IFR-AKCAZ-SC(3) 7,432.11 64.36 206.66 4,577.76 450741 4,48724 -2,383.58 5,961,405.82 346,811.21 0.24 4,111.84 MWD+IFR-AK-CAZSC(3) 7,526.59 64.32 206.90 4,618.67 4,548.32 4,563.27 -2,421.95 5,961,330.58 346,771.33 0.23 4,181.79 MWD+IFR-AK-CAZSC(3) 7,621.14 64.32 206.90 4,659.64 4,589.29 4,639.26 -2,460.50 5,961,255.39 346,731.26 0.00 4,251.67 MWD+IFR-AK-CAZSC(3) 8/72017 9:21:16AM Page 4 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-314X Project Western North Slope TVD Reference: CD5-314X: 33,8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Wen: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey _..- Map Map Vertical MD Inc AN TVD TVDSS -N/-S +E1 -W Northing Easting DLS Section (waft) (1) (0) (usft) (usft) (usk) (us8) (ft) (ft) (°1100') (ft) Survey Tool Name 7,713.16 64.35 207.18 4,699.50 4,629.15 4.713.13 -2,498.21 5,961,182.29 346692.08 0.28 4,319.58 MWD+1FR-AK-CAZ-SC(3) 7,80250 64.32 208.66 4,740.35 4,670.01 4,788.26 -2,538.02 5,961,10298 346,650.77 1.41 4,388.44 MWD+IFR-AK-CAZ-SC(3) 7,902.00 64.35 209.66 4,781.29 4,710.94 4,852.64 -2,579.52 5,961,034.45 396,MT79 0.95 4,456.32 MWD+IFR-AK-CAZ-SC (3) 7,996.38 64.35 21065 4,822.14 4,751.79 -0,936.21 -2,622.26 5,960,961.76 346,563.59 0.95 4,523.22 MWD+IFR-AK-CAZSC(3) 8,091.22 64.37 212.72 4,863.19 4,792.84 -5,008.96 -2,667.17 5,960,889.93 346,517.23 1.97 4,589.02 MWD+IFR-AK-CAZSC(3) 8,184.51 64.35 213.00 4,903.55 4,833.20 5,079.61 -2,712.80 5,960,820.22 346,470.19 0.27 4,652.62 MWD+IFR-AK-CAZSC(3) 8,278.78 64.38 212.87 4,944.35 4,87480 -5,150.93 -2,759.01 5,96.749.64 346,422.57 0.12 4,716.83 MWD+IFR-AK-CAZ-SC(3) 8,373.01 64.33 212.73 4,985.15 4,914.80 -5,222.33 -2,805.02 5,960,679.39 346375.14 0.14 4,781.12 MWD+IFR-AK-CAZ-SC(3) 8,467.62 63.80 213.04 5,026.53 4,956.18 -5,293.78 -2851.21 5,960,606.89 346,32252 0.63 4,845.45 MWD+IFR-AK-CA7-SC (3) 8,56148 63.84 212.37 5,067.94 4,997.59 5,364.66 -2,898.73 5,960,538.94 346,280.60 064 4,909.30 MWD+IFR-AK-CAZSC(3) 8,654.80 63.85 210.94 5,109.08 5,038.73 -5,435.96 -2,940.68 5,960,468.54 346,235.22 1.38 4,973.79 MWD+IFR-AK-CAZSC(3) 8,745.10 63.80 210.36 5,148.91 5,078.56 -5,505.67 -2,982.00 5,960,399.67 346,192.52 0.58 5,03].08 MWD+IFR-AK-CAZ-SC(3) 8,838.53 63.99 210.]2 5,190.02 5,119.67 5,577.93 -3,024.63 5,960,328.29 346,148.45 0.40 5,102.70 MWD+IFR-AK-CAZ-SC(3) 8,933.22 64.26 210.10 5,231.34 5,160.99 5,651.41 -3,067.75 5,96.255.70 346,103.86 0.65 5,169.46 MWD+IFR-AK-CAZ-SC(3) 9,027.93 64.29 209.87 5,272.45 5,202.10 -5,725.31 -3,110.40 5,960,182.67 346,059.75 0.22 5,236.71 MWD+IFR-AKCAZSC(3) 9,122.09 64.31 209.17 5,313.29 5,242.94 -5,799.14 5,152.20 5,960,109.70 346,016.47 0.67 5,304.01 MWD+IFR-AK-GSSC(3) 9,216.27 64.42 209.73 5,354.03 5,283.68 -5,873.08 -3,193.95 5,960,036.62 345,973.25 0.55 5,371.41 MWD+IFR-AK-CAZ-SC(3) 9,310.86 64.32 209.62 5,394.95 5,324.60 5,947.18 -3,236.17 5,959,963.39 345,929.56 0.15 6438.91 MWD+IFR-AK-CAZ-SC(3) 9,405.15 64.35 209.68 5,435.79 5,365.44 5,021.04 -3,278.21 5,959,890.40 345,886.09 0.07 5,506.20 MWD+IFR-AK-CAZ-SC(3) 9,499.24 64.28 210.11 5,476.57 5,406.22 5,094.55 -3,320.48 5,959,817.76 345,842.32 0.42 5,573.12 MWD+IFR-AK-CAZ-SC(3) 9,593.15 6425 210.36 5,517.34 5,446.99 5,167.64 3,363.07 5,959,745.54 345,798.26 0.24 5,639.57 MWD+IFR-AKCAZSC(3) 9,687.54 64.28 210.98 5,558.31 5,48].96 5,240.78 5,406.45 5,959,673.29 345,753.43 0.59 5,705.96 MWD+IFR-AKCAZ-SC(3) 9,781.78 64.32 210.80 5,599.18 5,52883 5,313.65 5,450.04 5,959,601.32 345,708.38 0.18 5,772.05 MWD+IFR-AKCAZ-SC(3) 9,874.11 64,32 210.68 5,639.19 5,558.84 5,385.17 5,492.58 5,959,530.67 345,664.43 0.12 6836.95 MWD+IFR-AKCAZ-SC(3) 9,970.58 64.26 210.73 5,681.04 5,610.69 -6,459.90 -3,536.96 5,959,456.85 346618.58 0.08 5,904.78 MND+IFR-AKCAZ-SC(3) 10,065.18 64.31 210.72 5,722.09 5,651.74 5,533.17 -3,580.51 5,959,384.48 345,573.55 0.05 5,971.28 MWD+IFR-AK-CAZSC(3) 10,159.14 6429 210.92 5,76284 5,692.49 5,605.88 -3,623.88 5,959,312.66 345,528.73 0.19 6,037.24 MWD+IFR-AK-CAZSC(3) 10,252.55 U.K 210.84 5,803.34 5,73299 5,678.12 3,667.08 5,959,24130 345,484.09 0.08 6,102.77 MWD+IFR-AK-CAZ-SC(3) 10,347.36 64.33 210.67 5,844.41 5,774.06 5,751.47 -3,710.91 5,956168.85 345,438.80 0.03 8,169.31 MND+IFR-AK-CAZ-SC(3) 10,441.84 &1.29 21055 5,885.37 5,815.02 5,824.67 5,754.39 5,959,096.54 345,393.87 0.31 6,235.75 MND+IFR-AK-CAZ-SC(3) 10,53637 64.33 209.79 5,926.52 5,856.17 5,898.63 3,797.38 5,959,023.47 345,349.40 0.72 6,303.00 MND+IFR-AK-CAZ-SC (3) 10,631,01 64.30 209.14 5,967.37 5,897.02 5,972.57 5,839.16 5,958,950.38 345,306.15 0.62 6,370.41 MND+IFR-AK-CAZ-SC (3) 10,725.09 64.26 209.23 6,008.20 5,937.85 -7,046.57 -3,880.49 5,958,877.23 345,263.35 0.10 6,437.94 MWD+IFR-AK-CAZ-SC(3) 10,818.93 64.29 209.50 6,048.93 5,978.58 -7,120.25 -3,921.94 5,958,804.41 345,220.43 0.26 6,505.13 MN4D+IFR-AKCAZSC(3) 10,91321 64,27 210.16 6,089.85 6,019.50 -7,193.94 -3,964.19 5,958,731.59 345,176.71 0.63 6,572.22 MWD+IFR-AKCAZSC(3) 11,006.27 64.13 210.10 6,130.35 6,060.0 -7,266.40 -4,006.25 5,95665999 345,133.21 0.16 6,638.12 MWD+IFR-AKCAZSC(3) 11,100.40 6422 20913 6,171.35 6,101.00 -7,340.06 4,048.12 5,958,58219 345,089.87 0.93 6,705.24 MWD+IFR-AK-CAZSC(3) 11,194.05 64.35 209.12 6,211.98 6,141.63 -7,413.77 4.089.19 5,958,514.33 345,047.34 0.15 6,772.51 MWD+IFR-AK-CAZSC(3) 11,288.36 00.29 20996 6,252.84 6,182.49 -7,487.72 4,131.09 5,958,441.24 345,003.96 0.81 6,839.91 MWD+IFR-AK-CAZ-SC(3) 11,38307 64.32 21083 6,293.91 6,223.56 -],561.33 4.174.28 5,958,368.62 34,959.31 0.83 6,906.80 MND+IFR-AK-CAZ-SC(3) 8/72017 9:21:16AM Page 5 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-314X Project Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method; Minimum Curvature Design: CDS314X Database: OAKEDMP2 Survey Map Map Vertical MD Inc Axi TVD TIDSS +W.S +E1 -W Northing Easting DLS Section (USM (1) (0) (usft) (us(M (csm (usft) (ft) (ft) (°1100') (el Survey Tool Name 11,475.39 64.26 210.85 6,333.96 6,263.61 -7,632.75 4,216.92 5,958,29797 341,915.25 0.07 6,971.59 MWD+1FR-AK-CAZ-SC(3) 11,570.03 64.22 211.14 6,375.09 6,304.74 -7,705.81 4,260.81 5,958,225.81 34,869.90 0.28 7,037.83 MWD+IFR-AK-CAZ-SC(3) 11,663.84 64.23 211.29 6,415.88 6,345.53 -7,778.06 4,304.59 5,956,154.46 344,824.68 0.14 7,103.28 MWD+IFR-AK-CAZ-SC(3) 11,758.22 64.26 210.96 6,456.89 6,386.54 -7,850.83 4,348.53 5,956,082.60 366,779.29 0.32 7,169.23 MWD+IFR-AK-CAZSC(3) 11,852.63 64.33 21042 6,497.84 6,427.49 -7,923.98 4,391.95 5,958,010.33 344,734.42 0.52 7,235.62 MWD+IFR-AK-CAZSC(3) 11,947.09 64.16 209.88 6,538.89 6,468.54 -7,997.55 4,434.68 5,957,937.65 34,690.23 0.55 7,302.53 MWD+IFR-AK-CAZSC(3) 12,040.41 64.33 210.14 6,57944 6,509.09 5,070.33 4,47612 5,957,865.73 344,646.74 0.31 7,368.75 MND+IFR-AK-CAZ-SC(3) 12,134.74 64.26 210.77 6,620.35 6,550.00 5,143.60 4,519.80 5,957,793.35 344,602.20 0.61 7,435.31 MND+1FR-AK-CAZSC(3) 12,229.70 64.29 210.79 6,661.57 6,59122 5,21209 4,563.57 5,957,720.75 344,556.96 0.04 7,502.00 MWD+1FR-AK-CAZ-SC(3) 12,323.24 64.19 210.88 6,702.22 6,631.87 5,289.43 4,606.75 5,957,649.30 344,512.34 0.14 7,567.62 MWD+IFR-AK-CAZ-SC (3) 12,416.80 6423 211.24 6,74293 6,672.58 5,361.59 4,650.22 5,957,578.03 344,467.44 0.35 7,633.03 MND+IFR-AK-CAZ-SC(3) 12,511.15 64.25 211.54 6,783.92 6,713.57 5,434.13 4,694.48 5,957,506.40 34,421.73 0.29 7,698.71 MWD+IFR-AK-CAZSC(3) 12,605.49 64.27 211.21 6,824.89 6,754.54 5,506.69 4,738.72 5,957,434.75 344,376.04 0.32 7,764.40 MWD+1FR-AK-CAZSC(3) 12,700.22 64.32 210.90 6,865.98 6,795.63 5,579.81 4,782.76 5,957,362.53 344,330.56 0.30 7,830.68 MWD+IFR-AK-CAZ-SC(3) 12,793.91 64.32 210.48 6,906.58 6,836.23 5,652.42 4,825.85 5,957,290.80 344,286.02 0.40 7,896.59 MND+1FR-AK-CAZ-SC (3) 12,888.17 64.73 208.67 6,947.12 6,876.77 5,726.43 4,667.85 5,957,217.66 34,242.55 1.79 7,954.03 MNDAFR-AK-CAZSC (3) 12,982.12 65.52 206.17 6,986.65 6,916.30 5,802.08 4,90209 5,957,142.82 344,201.80 2.56 8,033.48 MWD+IFR-AK-CAZSC(3) 13,076.48 66.59 203.51 7,024.95 6,954.60 5,880.33 4,943.30 5,957,065.31 344,164.02 2.81 8,105.93 MWD+IFR-AK-CAZ-SC(3) 13,171.09 67.34 201.05 7,061.97 6,991.62 5,960.89 4,976.30 5,958,985.44 344,12941 2.52 8,181.12 MWD+IFR-AK-CAZ-SC(3) 13,265.81 67.88 198.01 7,098.06 7,02711 -9,043.42 5,005.57 5,956,90352 344,098.49 3.02 8,258.77 MWD+IFR-AK-CAZ-SC(3) 13,359.66 68.99 193.80 7,132.57 7,052.22 -9,127.34 5,029.47 5,955,820.11 344,072.92 4.34 8,338.54 MWD+IFR-AK-CAZSC(3) 13,454.25 70.16 189.45 7,165.59 7,095.24 -9,214.14 -5,047.32 5,956,733.69 344,053.34 4.48 8,422.02 MWD+IFR-AK-GSSC(3) 13,548.16 72.00 18544 7,196.05 7,12510 -9,302.20 -5,058.81 5,956,845.88 344,040.08 4.49 8,507.62 MWD+IFR-AK-CAZ-SC(3) 13,641.40 73.38 182.54 7,223.80 7,15345 -9,390.99 -5,064.99 5,956,55724 344,032.12 3.32 8,594.69 MND+1FR-AK-CAZ-SC(3) 13,736.10 74.72 180.02 7,249.83 7,179.48 -9,482.01 -5,067.02 5,956,466.28 344,028.26 2.92 8,684.54 MWD+IFR-AK-CAZ-SC(3) 13,830.53 75.60 178.04 7,274.01 7,203.66 -9,573.27 -5,065.47 5,956,375.02 344,027.98 2.23 8,775.13 MWD+IFR-AK-CAZSC(3) 13,924.81 7647 17659 7,296.77 7,226.42 -9,66466 -5,061.18 5,956,283.57 344,030.43 115 8,8%.23 MND+1FR-AK-CAZ-SC(3) 14,019.17 77.89 176.15 7,317.70 7,247.35 -9,755.48 5,055.36 5,956,19L65 344,034.41 1.57 8,9S7.96 MND+IFR-AK-CAZ-SC(3) 14,11360 79.27 175.77 7,336.40 7,266.05 -9,848.81 5,048.83 5,956,099.22 341,039.08 1.51 9,050.30 MWD+IFR-AK-CAZSC(3) 14,208.14 81.60 175.26 7,352.11 7,281.76 -9,941.74 -5,041.54 5,956,006.17 344,044.50 2.52 9,143.34 MWD+1FR-AK-CAZSC(3) 14,303.03 82.90 175.78 7,364.90 7,294.55 -10,035.48 -5,034.20 5,955,912.31 34,049.96 1.47 9,237.19 MWD+IFR-AK-CAZSC(3) 14,397.37 84.61 173.99 7,375.17 7,304.82 -10,128.88 5,025.84 5,955,818.77 34056.45 2.62 9,330.84 MND+IFR-AK-CAZ-SC(3) 14,491.55 85.71 173.95 7,383.11 7,312.76 -10,22220 5,015.98 5,955,725.27 344,064.43 1.17 9,424.63 MND+IFR-AK-CAZ-SC (3) 14,586.25 86.08 173.94 7,389.89 7,319.54 -10,316.13 5,006.02 5,955,631.17 344,072.51 0.39 9,519.03 MWD+IFR-AK-CAZ-SC(3) 14,680.51 85.95 174.17 7,396.44 7,326.09 -10,409.66 4,996.28 5,955,537.47 344,080.37 0.28 9,613.00 MWD+IFR-AK-CAZ-SC (3) 14,774.84 86.28 175.27 7,402.83 7,332.48 -10,503.37 4,987.62 5,955,443.61 344,087.14 1.21 9,707.01 MWD+IFR-AK-CAZSC(3) 14,669.96 86.13 174.71 7,409.13 7,33818 -10,597.92 4,979.33 5,955,348.93 344,093.53 0.61 9,801.79 MN40+IFR-AK-CAZSC (3) 14,923.09 86.75 17534 7,412.43 7,342.08 -10,650.74 4,974.73 5,955,296.02 34,09707 1.66 9,854.74 MWD+1FR-AK-CAZ-SC(3) 14,976.00 90.12 177.95 7,413.87 7,343.52 -10,703.53 4,971.64 5,955,243.19 344,099.10 8.06 9,907.45 NOT an Actual Survey 7518" x 9-7/8 by 10-111 6172017 9: 21: 16AM Page 6 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConvemion Local Coordinate Reference: Well CDS-314X Project: Western North Slope TVD Reference: CDS-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey__ _. Map Map Vertical MD Inc Azl TVD TVDSS +NIS +FJ -W Northing Easting DLS Section (unit) (ry (0) (usft) Nam (usft) Nam (ft) (ft) (0/4007 (ft) Survey Tool Name 14,996.31 91.42 17895 7,41360 7,343.25 -10,723.83 4.971.09 5,955,222.88 344,099.24 8.06 9,927.63 MN13+1FR-AK-CAZ-SC(4) 15,097.72 8982 174.13 7,412.57 7,342.22 -10,819.03 4,965.33 5,955,127.59 344,103.09 5.32 10,022.70 MWD+IFR-AK-CAZ-SC(4) 15,187.23 89.63 16997 7,413.02 7,342.67 -10,913.60 4,952.12 5,955,032.78 344,114.39 4.36 10,118.19 MWD+IFR-AK-CAZSC(4) 15,283.10 8928 167.09 7,413.94 7,343.59 -11,007.54 4,933,05 5,954,938.48 344,131.56 3.03 10,213.87 MWD+IFR-AKCAZ-SC(4) 15,377.17 89.43 163.73 7,415.00 7,344.65 -11,096.56 4,909.37 5,954,84702W.15142 3.58 10,307.30 MWD+IFR-AKCAZ-SC(4) 15,472.80 8939 16343 7,415.98 7,345.63 -11,19028 4,882.34 5,954,75477 344,178.60 0.32 10,401.89 MWD+IFR-AK-CAZSC(4) 15,568.79 89.15 162.87 7,417.20 7,346.85 -11,282.15 4,854.52 5,95,662.38 344,20457 0.63 10,49673 MM+IFR-AK-CAZ-SC(4) 15,664.30 8968 167.20 7,418.18 7,347.63 -11,374.39 4,829.86 5,954,569.67 344,227.37 4.57 10,591.51 MWD+IFR-AKCAZ-SC(4) 15,759.91 89.42 169.32 7,418.93 7,348.58 -11,467.99 4.810.41 5,95,475.70 344,240.94 2.23 10,686.91 MWD+IFR-AK-CAZSC(4) 15,855.22 89.56 172.53 7,419.78 7,349.43 -11,562.09 4,795.38 5,954,381.32 344,258.08 3.37 10,782.18 MM+IFR-AK-CAZSC (4) 15,950.39 8964 174.53 7,420.44 7,350.09 -11,656.65 4.784.66 5,951.286.58 34,266.90 2.10 10,877.31 MWD+IFR-AK-CAZ-SC(4) 16,044.40 89.21 177.77 7,421.39 7,351.04 -11,750.43 4,778.34 5,954,19270 344,271.33 348 10,971.06 MWD+IFR-AKCAZ-SC(4) 16,139.88 89.41 18071 7,422.54 7,352.19 -11,845.88 4.777.08 5,954,097.24 344,270.68 3.09 11,065.76 MWD+IFR-AKCAZSC(4) 16,235.16 89.19 177.48 7,423.70 7,353.35 -11,941.13 4,775.57 5,954,001.99 344,27027 3.40 11,160.29 MWD+IFR-AK-CAZSC(4) 16,329.78 89.39 160.01 7,424.87 7,354.52 -12,03571 -4,773.50 5,953,90739 344,270.44 268 11,254.24 MWD+IFR-AK-CAZ-SC(4) 16,425.63 9023 181.34 7,425.19 7,354.84 -12,131.55 4,774.63 5,953,817.60 344,267.39 1.64 11,348.99 MWD+IFR-AK-CAZ-SC(4) 16,520.37 89.87 181x!) 7,425.11 7,354.76 -12,226.27 4.776.64 5,953,716.95 344,263.48 046 11,442.51 MWD+IFR-AKCAZSC(4) 16,616.42 8978 180.14 7,425.40 7,355.05 -12,322.31 -4,77767 5,953,620.95 344,260.52 099 11,537.47 MWD+IFR-AK-CAZSC(4) 16,711.43 88.78 177.10 7,426.60 7,356.25 -12,417.28 -4,775.38 5,953,525.97 344,260.90 3.37 11,631,83 MVD+IFR-AK-CAZ-SC (4) 16,806.23 90.13 172.00 7,427.50 7,357.15 -12,511.61 .1,766.38 5,953,43148 344,268.01 5.56 11,726.60 MWD+IFR-AKCAZ-SC(4) 16,901.54 90.40 169.33 7,42706 7,35671 -12,605.65 4,750.92 5,953,337.16 34,281,57 2.82 11,82177 MWD+IFR-AKCAZSC(4) 16,996.91 89.09 165.07 7,427.48 7,357.13 -12,698.62 4,729.80 5,953,243.79 344,300.83 4.67 11,916.78 MWD+IFR-AK-CAZ-SC(4) 17,091.59 89.41 160.93 7,428.72 7,358.37 -12,789.14 4,702.13 5,953,152.74 344,326.68 4.39 12,010.27 MWD+IFR-AK-CAZ-SC(4) 17,186.81 88.44 160.14 7,430.51 7,360.16 -12,878.90 4,670.40 5,953,062.37 344,356.59 1.31 12,103.57 MWD+IFR-AKCAZ-SC(4) 17,281,64 89.25 161.55 7,432.42 7,362.07 -12,968.46 4,639.29 5,952,972.21 344,385.89 1.71 12,196.59 MWD+1FR-AKCAZSC(4) 17,377.32 8788 162.49 7,434.82 7,364.47 -13,059.43 -4,609.77 5,952,860.67 341,413.56 1.74 12,290.78 MWD+IFR-AK-CAZ-SC(4) 17,471.33 86.50 167.00 7,439.43 7,369.08 -13,150.00 4,585.07 5,952,789.64 344,436.46 5.01 12,383.90 MWD+IFR-AKCA7-SC(4) 17,566.83 91.98 171.09 7,440.69 7,370.34 -13,243.69 -4,566.94 5,952,69560 34,452.71 7.16 12,479.21 MWD+IFR-AKCAZ-SC(4) 17,662.30 90.94 172.63 7,438.26 7,367.91 -13,338.17 -4,55342 5,952,600.88 344,464.32 1.95 12,57465 MVD+IFR-AKCAZSC(4) 17,756.16 89.68 174.28 7,437.75 7,367.40 -13,431.41 4,542.72 5,952,507.45 344,473.14 2.21 12,668.47 MWD+IFR-AKCAZSC(4) 17,855.40 8924 173.14 7,438.69 7,368.34 -13,530.04 4,531.85 5,952,408.62 344,482.03 1.23 12,767.66 MWD+IFR-AKCAZSC(5) 17,953.11 90.16 171.49 7,439.20 7,368.85 -13,626.87 4,518.79 5,952,317.56 344,493.15 1.93 12,865.36 MWD+IFR-AKCAZSC(5) 18,048.52 90.41 16943 7,438.73 7,368.38 -13,720.96 4,502.98 5,952,217.19 344,507.07 2.17 12,960.73 MWD+IFR-AKCAZ-SC(5) 18,143.27 89.62 165.86 7,438.70 7,363.35 -13,813.50 4,482.71 5,952,12427 344,525.48 386 13,055.19 MWD+IFR-AK-CAZ-SC(5) 18,238.09 90.65 165.02 7,438.48 7,368.13 -13,905.27 4,458.87 5,952,03204 344,547.47 1+40 13,149.39 MWD+IFR-AK-CAZ-SC(5) 18,333.67 88.78 170.43 7,438.95 7,368.60 -13,998.62 4,438.56 5,951,938.30 344,565.90 5.99 13,244.66 MND+IFR-AKCAZSC (5) 18,428.89 89.27 175.25 7,440.57 7,370.22 -14,093.06 -4,426.69 5,951,843.65 344,575.86 5.09 13,339.83 MWD+IFR-AKCAZSC(5) 18,524.01 89.26 176.88 7,441.79 7,371.44 -14,187.94 4,420.17 5,951,748.67 344,58048 1.71 13,434.70 MWD+IFR-AKCAZ-SC(5) 18,619.75 89.42 17893 7,442.90 7,372.55 -14,283.61 4,416.67 5,951,652.96 344,582.06 2.15 13,529.92 MND+IFR-AK-CAZ-SC (5) 18,715.81 90.52 180.26 7,442.95 7,372.60 -14,379.66 4,41599 5,951,5%.92 344,550.81 1.80 13,625.13 MWD+IFR-AK-CAZ-SC(5) 802017 9:21:16AM Page 7 COMPASS 5000 14 Burnt 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usff (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CDS-314X Survey Calculation Method: Minimum Curvature Design: CD&314X Database: OAKEDMP2 Survey map P Map vertical MD Inc Azl TVD TVDSS +N/ -S +E/ -W Eastfng DLS Section (unit) (1) (% (usft) (usft) (usft) (usft) (g) (it) (°/1001 (f) 'Survey Tool Name 18,810.67 9027 18723 7,442.29 7,371.94 -14,474.26 -0,422.18 5,951,462.47 344,57272 7.35 13,717.95 MWD+IFR-AK-CAZSC(5) 18,905.74 90.86 180.61 7,441.35 7,371.00 -14,569.05 -4,428,68 5,951,367.84 344,564.33 6.99 13,810.91 MWD+IFR-AI(-CAZSC(5) 19,000.03 90.33 174.78 7,440.37 7,370.02 -14,663.22 4,424.89 5,951,273.62 344,566.23 6.21 13,904.69 MWD+IFR-AK-CAZ-SC(5) 19,095.60 89.56 173.67 7,440.47 7,370.12 -14,758.30 -0,415.27 5,951,178.37 344,573.93 1.41 14,000.18 MWD+IFR-AK-CAZ-SC(5) 19,190.23 89.56 175.03 7,441.19 7,370.84 44,852.46 4,405.95 5,951,084.04 344,581.35 1.44 14,094.73 MWD+IFR-AK-CAZSC(5) 19,285.14 88.05 174.26 7,443.17 7,372.82 -14,946.94 4,397.10 5,950,989.42 344,588.31 1.79 14,189.52 MWD+IFR-AK-CAZ-SC(5) 19,382.08 90.08 17298 7,444.75 7,37440 -15,043.26 4,386.33 5,950,892.91 344,597.15 2.48 14,286.40 MWD+IFR-AK-CAZSC(5) 19,476.28 89.98 173.18 7,444.70 7,374.35 -15,136.77 4,374.98 5,950,799.19 34,606.61 0.24 14,380.58 MWD+IFR-AK-CAZ-SC(5) 19,571.88 90.21 17169 7,444.55 7,374.20 -15,231.53 4,362.39 5,950,704.20 344,617.29 1.58 14,476.17 MWD+IFR-AK-CAZ-SC(5) 19,666.57 89.94 169.61 7,444.42 7,374.07 -15,324.96 4,347.01 5,950,61049 344,630.80 2.22 14,570.83 MWD+IFR-AK-CAZ-SC(5) 19,761.81 90.13 166.49 7,444.36 7,374.01 -15,418.13 4.327.29 5,950,516.96 344,648.64 3.28 14,505.83 MWD+1FR-AK-CAZSC(5) 19,857.20 90.02 168.03 7,444.24 7,373.89 45,511.16 4,306.26 5,95,423.52 34,667.80 1.62 14,760.90 MWD+IFR-AK-CAZ-SC(5) 19,952.98 89.81 175.05 7,444.38 7,374.03 -15,605.84 4.292.17 5,950,328.59 344,679.98 7.33 14,856.61 MWD+IFR-AK-CAZSC(5) 20,048.10 89.79 176.35 7,444.71 7,374.36 -15,700.69 4,285.04 5,950,233.62 344,685.21 1.37 14,951.53 MWD+IFR-AK-CAZ-SC(5) 20,143.12 89.15 173.73 7,445.59 7,37524 -15,795.34 -0,276.83 5,950,138.83 344,691.52 2.84 15,046.40 MWD+IFR-AK-CAZ-SC(5) 20,239.78 89.09 168.20 7,447.08 7,376.73 -15,890.76 4,26166 5,950,043.14 34,704.77 5.72 15,143.00 MWDNFR-AK-CAZ-SC(5) 20,335.00 89.31 165.66 7,448.41 7,378.06 -15,983.49 4,240.13 5,949,950.00 34,724.43 2.68 15,237.83 MWD+IFR-AK-CAZSC(5) 20,430.11 89.01 168.34 7,449.80 7,379.45 -16,075.77 -0,217.12 5,949,857.29 34,745.58 0.78 15,332.41 MWD+IFR-AK-CAZ-SC(5) 20,525.30 89.68 171.44 7,450.89 7,380.54 -16,169.13 4,198.79 5,949,763.58 34,762.04 5.40 15,42242 MWD+IFR-AK-CAZSC(5) 20,620.15 89.71 177.30 7,451.40 7,381.05 -16,263.48 1,189.49 5,949,65907 344,769.44 6.18 15,522.15 MWD+IFR-AK-CAZ-SC(5) 20,716.18 89.49 181.24 7,452.07 7,381.72 -16,35949 4,188.26 5,949,573.07 344,768.74 4.11 15,617.38 MWD+1FR-AK-CAZ-SC(5) 20,811.09 90.05 182.27 7,452.45 7,382.10 -16,454.35 4.191.17 5,949,47829 34,763.93 1.24 15,710.92 MWD+IFR-AK-CAZSC(5) 20,906.35 90.57 184.74 7,451.93 7,381.58 -16,54942 4,196.99 5,949,38336 34,755.20 2.65 15,804.26 MND+IFR-AK-CAZ-SC(5) 21,001.13 91.38 182.63 7,450.32 7,379.97 -16,643.99 4.203.08 5,949,288.94 344,748.21 2.38 15,897.05 MWD+IFR-AK-CAZ-SC(5) 21,09562 90.40 182.51 7,448.85 7,378.50 -16,738.37 4,207.32 5,949,194.67 34,742.08 1.04 15,989.93 MWD+IFR-AK-CAZSC(5) 21,190.81 89.07 184.08 7,449.29 7,378.94 -16,833.39 4,212.79 5,949,099.78 344,734.71 2.16 16,083.27 MWD+IFR-AK-CAZSC(5) 21,285.51 89.93 179.77 7,450.07 7,379.72 -16,928.01 4,215.97 5,949,005.25 344,729.63 4.65 16,176.52 MND+IFR-AK-CAZ-SC(5) 21,380.19 87.50 178.53 7,452.14 7,381.79 -17,022.65 4,214.57 5,948,910.61 344,729.13 2.94 16,270.43 MWD+IFR-AK-CAZ-SC (6) 21,474.40 88.22 177.21 7,455.66 7,385.31 -17,116.73 -0,21107 5,948,81649 344,730.74 1.60 16,364.08 MWD+IFR-AK-CAZSC(6) 21,569.21 88.87 174.78 7,458.07 7,387.72 -17,211.27 4,204.45 5,948,721.84 344,73546 2.65 16,468.62 MWD+IFR-AK-CAZSC(6) 21,665.25 89.55 173.02 7,459.39 7,389.04 -17,306.75 4,194.24 5,948,626.18 344,743.75 1.96 16,554.60 MWD+IFR-AK-CAZSC (6) 21,759.81 89.93 171.61 7,459.82 7,389.47 -17,400.46 4,181.60 5,948,532.25 344,754.51 1.54 16,649.15 MND+IFR-AK-CAZ-SC (6) 21,855.14 89.62 170.53 7,460.20 7,389.85 -17,494.63 4,16560 5,948,437.80 344,76]41 1.18 16,744.47 MND+IFR-AK-CAZ-SC(6) 21,950.48 89.52 169.64 7,460.91 7,390.56 -17,588.54 4,150.38 5,948,343.59 344,781.94 0.94 16,839.75 MWD+IFR-AK-CAZSC(6) 22,046.23 89.55 169.38 7,46169 7,391.34 -17,682.69 4132.95 5,948,249.12 344,797.47 0.27 16,935.41 MND+IFR-AK-CAZSC(6) 22,141.47 90.15 172.53 7,461.94 7,391.59 -17,776.73 4,117.98 5,948,154.80 344,810.55 3.37 17,030.62 MND+IFR-AK-CAZ-SC(6) 22,236.11 90.03 172.05 7,461]9 7,391.44 -17,870.52 4.105.29 5,948,060.79 344,821.36 0.52 17,125.26 MWD+IFR-AK-CAZ-SC(6) 22,331.54 89.31 170.61 7,462.34 7,391.99 -17,964.85 4,090.90 5,947,966.19 344,833.85 1.69 17,220.68 MWD+IFR-AK-CAZSC (6) 22,426.68 89.11 166.63 7,463.65 7,393.30 -18,058.42 4,073.76 5,947,872.30 344,849.11 209 17,315.72 MND+IFR-AK-CAZ-SC(6) 22,522.18 88.66 165.00 7,465.51 7,395.16 -18,151.37 4,051.99 5,947,778.94 344,869.01 3.83 17,410.80 MWD+IFR-AK-CAZSC(6) 8/72017 9:21:16AM Page 8 COMPASS 5000.14 Build 85 � I ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CDS-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD&314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD&314X Database: OAKEDMP2 ' Survey Map Map Vertical MD Inc AN TVD TVDSS +N/ -S +Cf -W Northing Casting DLS Section (use 0 (0) (usft) (psm (WM (usft) (@) (ft) (°11007 (ft) Survey Tool Name 22,617.56 89.01 164.82 7,467.45 7,397.10 -18,243.44 4,027.16 5,947,68840 344891.98 0.41 17,505.43 MWD+IFR-AK-CAZ-SC(6) 22,71247 88.73 165.04 7,469.32 7,398.97 -18,335.07 -0,002.49 5,947,594.30 344,914.81 0.38 17,599.60 MWD+IFR-AK-CAZSC(6) 22,808.73 89.00 165.37 7,471.23 7,400.88 -18,428.12 -3,977.91 5,947,500.78 344,937.51 0.44 17,695.16 MWD+IFR-AK-CA7-SC(6) 22,903.93 89.97 169.63 7,472.08 7,401.73 -18,521.04 -3,957.31 5,947,40747 344,95624 4.59 17,790.04 MWD+IFR-AK-CAZ-SC(6) 22,998.49 89.68 173.99 7,472.37 7,402.02 -18,614.61 5,943.85 5,947,31166 344,967.82 4.62 17,884.58 MVVD+IFR-AK-CAZSC (6) 23,094.67 8761 174.73 7,474.65 7,404.30 -18,710.29 -3,934.40 5,947,217.81 344,975.35 229 17,980.64 MWD+IFR-AK-CAZSC(6) 23,189.86 9186 174.83 7,475.75 7,40540 -18,805.07 5,92574 5,947,12289 344,982.10 3.63 18,075.70 MWD+IFR-AK-CAZ-SC(6) 23,284.55 91.20 17424 7,473.89 7,403.54 -18,899.31 -3,916.72 5,947,028.49 344,989.23 0.64 18,17028 MWD+1FR-AK-CAZSC(6) 23,380.59 90.75 173.01 7472.25 7,401.90 -18,994.74 -3,90686 5,946,93288 344,99.97 1.36 18,266.26 MWD+IFR-AK-CAZ-SC(6) 23,475.19 90.65 171.62 7,471.10 7,400.75 -19,088.48 5,893.41 5,946,838.91 345,008.73 1.47 18,360.85 MWD+IFR-AK-CAZSC(6) 23,570.80 89.16 165.58 7471.25 7,400.90 -19,182.16 -3,874.52 5,946,744.88 345,025.74 6.51 18,456.25 MWD+IFR-AK-CAZ-SC(6) 23,665.22 89.94 162.32 7,472.00 7,40165 -19,272.88 5,84842 5,946,653.65 345,050.01 3.55 18,54912 MWD+IFR-AK-CAZ-SC(6) 23,761.24 89.59 160.56 7,472.39 7,402.04 -19,363.90 -3,817.85 5,946,562.04 345,078.73 1.87 18,644.11 MWD+IFR-AKCAZSC(6) 23,856.70 89.25 158.89 7,473.36 7,403.01 -19,453.44 -3,784.78 5,946,47187 345,11001 1.79 18,737.38 MWD+rFR-AK-CAZ-SC(6) 23,951.78 89.18 159.40 7,474.66 7,404.31 -19,542.28 5,750.94 5,946,382.37 345,142.06 0.54 18,830.07 MWD+IFR-AK-CAZ-SC(6) 24,046.65 88.82 161.04 7,476.31 7,405.96 -19,631.54 -3,718.84 5,946,292.50 345,172.36 1.77 18,922.92 MWD+IFR-AK-CAZSC(6) 24,140.98 90.39 164.60 7,476.96 7,406.61 -19.721.64 5,690.98 5.946,201.86 345,198.40 4.12 19,016.02 MWD+IFR-AK-CAZ-SC(6) 24,23765 90.34 166.47 7,476.35 7,406.00 -19,815.24 -3,656.84 5,946,107.80 345,22066 1.94 19,112.07 MWD+IFR-AKCAZSC(6) 24,333.20 89.97 166.44 7,476.09 7,405.74 -19,908.13 5,644.46 5,946,014.49 $45,241.17 0.39 19,207.18 MWD+IFR-AKCAZ-SC(6) 24,428.50 90.45 168.78 7,475.74 7,405.39 -20,001.20 5,624.01 5,945,921.03 345,259.74 2.51 19,302.19 MVVD+1FR-AK-CAZ-SC (6) 24,523.55 89.47 173.65 7,475.61 7,405.46 -20,095.11 -3,609.50 5,945,826.86 345,272.36 5.23 19,39720 MWD+IFR-AK-CAZSC(6) 24,618.66 89.73 178.65 7,476.47 7,406.12 -20,189.9 -3,603.12 5,90.5,73189 345,278.84 5.26 19,492.03 MWD+IFR-AKCAZSC(6) 24,713.84 90.06 181.80 7,476.65 7,406.30 -20,285.14 5,603.49 5,945,636.76 345,274.56 3.33 19,586.22 MWD+IFR-AK-CAZ-SC(6) 24,809.61 89.09 180.41 7,477.36 7/107.01 -20,380.88 -3,605.34 5,945,541.08 345,270.79 177 19,680.77 MWD+IFR-AK-CAZ-SC(6) 24,904.73 90.67 17942 7,47756 7,407.21 -20,476.00 -3,605.20 5,945,445.98 345,269.02 1.96 19,774.98 MWD+IFR-AK-CAZ-SC(6) 25,000.07 89.66 177.81 7,477.28 7,406.93 -20,571.31 -3,602.89 5,945,35066 345,269.41 1.99 19,869.68 MWD+IFR-AKCAZSC(6) 25,095.49 9165 173.75 7,476.19 7,405.84 -20,666.44 -3,595.87 5,945,255.41 345,274.52 4.74 19,954.87 MWD+IFR-AK-CAZ-SC(6) 25,191.21 89.68 170.24 7,47508 7,40433 -20,761.20 5,582.55 5,945,160.41 345,285.94 4.20 20,060.56 MWD+IFR-AK-CAZSC(6) 25,285.78 88.62 164.26 7,476.48 7,406.13 -27,853.38 5,561.69 5,945,067.83 345,304.94 6.42 20,15415 MWD+IFR-AK-CAZ8C(6) 25,380.91 89.24 160.24 7,478.26 7,407.91 -20,943.95 5,532.70 5,944,97671 345,332.11 4.28 20,248.47 MWD+IFR-AKCAZSC(6) 25,476.12 89.14 164.17 7,479.61 7409.26 -21,034.58 5,503.61 5,944,885.52 345,359.37 4.13 20,342.26 MWD+IFR-AKCAZ-SC(6) 25,571.30 8921 172.33 7,480.98 7,410.63 -21,127.68 -3,484.24 5,944,792.W 345,376.86 8.57 20,437.15 MWD+IFR-AK-CAZ-SC(6) 25,66794 89.49 177.50 7,48208 7,411.73 -21;223.90 -3,475.68 5,944695.69 345,383.49 5.35 20,533.63 MWD+IFR-AK-CAZSC(6) 25,762.32 90.54 183.31 7,482.05 7,411.70 -21,318.23 5,476.35 5,944,601.40 345,380.93 6.26 20,626.95 MWD+IFR-AKCAZSC(6) 25,857.50 89.69 176.67 7,481,86 7,411.51 -21,413.36 -3,476.33 5,944506.30 345,379.9 7.03 20,721.15 MWD+IFR-AK-CAZ-SC(6) 25,953.72 89.67 169.47 7,48240 7,412.05 -21,59.81 -,46413 5,944410.64 345,388.72 7.48 20,817.29 MWD+1FR-AK-CAZSC(6) 26,048.31 87.91 163.73 7,484.40 7,414.05 -21,60076 5,442.83 5,944,318.27 345,408.77 6.35 20,911.40 MWD+IFR-AKCAZSC(6) 26,143.27 89.98 171.91 7,486.15 7,415.80 -21,693.49 -3,422.81 5,944,225.17 345,426.91 8.88 21,006.00 MWD+IFR-AK-CAZ-SC(6) 26,239.12 89.21 175.58 7,486.83 7,416.48 -21,788.75 5,412.37 5,944,129.73 345,435.44 3.91 21,101.79 MWD+IFR-AK-CAZ-SC(6) 26,333.94 89.43 172.37 7,487.95 7,417.60 -21,883.02 5,402.42 5,944,03528 345,443.50 3.39 21,196.53 MWD+IFR-AKCAZSC(6) 8172017 9:21: 16AM Page 9 COMPASS 5000.14 Build 95 ConocoPhillips Definitive Survey Report Company: NADConversion Lowl Coordinate Reference: Well CD5-314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CDs Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: COS -314X Database: OAKEDMP2 Survey E] Surface Coordinates Ll Declination & Convergence GRS Survey Corrections Survey Tool Codes tgttph'I"I e4 Mara rdon BrandonTemple�emRmm SLB DE: WilliamEarhart��art"` Wil®m Client Representative: w�a,7.0am,4 ,43 aaaa Date: Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E(.W Northing Easting DLS Section (usft) (1) (a) (usft) (usft) (usft) . Wall) (ft) (ft) (°/100') (ft) Survey Toot Name 26,429.61 89.69 175.22 7,488.69 7,418.34 -21,978.12 -3,392.08 5,943,940.00 345,451.92 2.99 21 292.14 MWD+IFR-AK-CAZ-SC (6) 26,52567 89.49 179.26 7,489.37 7,419.02 -22,074.05 3,387.46 5,943,844.01 345,454.62 4.21 21,387.78 MWD+IFR-AK-CAZSC(6) 26,621.83 89.59 178.29 7,490.15 7,419.80 -22,170.18 3,385.40 5,993,747.86 345,454.75 1,01 21,483.27 MWD+IFR-AK-CAZ-SC(6) 26,718.50 89.13 174.98 7,491.20 7,420.85 -22.264.67 3,379.85 5,943,6M 29 345,458.41 3.53 21,577.61 MWD+IFR-AK-CAZSC(6) 26,812.02 89.57 170.16 7,492.29 7,421.94 -22,359.35 -3,367.50 5,993,55838 345,468.85 5.07 21,673.09 MWD+IFR-AK-CAZSC(6) 26,907.58 89.28 170.33 7,493.25 7,422.90 -22,453.53 -3,351.31 5,943,463.91 345,483.14 0.35 21,76860 MWD+IFR-AK-CAZ-SC(6) 26,950.13 89.57 172.03 7,493.67 7,423.32 -22,495.57 5,344.79 5,943,421.75 345,488.82 4.05 21,811.14 MWD+IFR-AK-CAZSC(6) 27,000.00 89.57 172.03 7,494.05 7,423.70 -22,544.96 5,337.87 5,943,372.23 345,494.74 0.00 21,861.01 NOT an Actual Survey 4-1/2'Sr 6374" 27,010.00 89.57 172.03 7,494.12 7,423.77 -22,554.86 -3,336.48 5,943,362.31 345,495.93 0.00 21,87101 PROJECTEDto TD Final Definitive Survey Verified and Signed -off All targets and/or well position objectives have been achieved. QQ yes C No I have checked to the best of my ability that the following data is correct E] Surface Coordinates Ll Declination & Convergence GRS Survey Corrections Survey Tool Codes tgttph'I"I e4 Mara rdon BrandonTemple�emRmm SLB DE: WilliamEarhart��art"` Wil®m Client Representative: w�a,7.0am,4 ,43 aaaa Date: &7/P017 8/7/2017 9:21:16AM Page 10 COMPASS 5000 14 Build 65 Cement Detail Report CD5-314X String: Surface Casing Cement Job: DRILLING ORIGINAL, 6/11/2017 00:00 Cement Details Description Cementing Start Date Cementing Entl Date Wellbore Name Surface Casing Cement 6/13/2017 2015 6/13/2017 2247 CD5-314X Comment Tested cmt lines to 3000 psi and pumped 75.1 bbl of 10.5 ppg MudPush. Dropped the bottom plug and pumped 281.5 bbl of 11 ppg LightCREAT cmt, followed by 60 bbl of class G 15.8 ppg cmt. Dropped the bottom plug and chased w/ 20 bbl of H2O. Swapped over to rig pumps and displaced with 198.2 bbl of 10.1 ppg mud at 8 bpm, 600-800 psi. bumped the plug w/ 1050 psi and held for 5 min. Checked floats and held. Full returns w/ 100 bbl of good cmt to surface were observed. "CIP @ 22:47" Cement Stages Stage # 1 Description Objective Top Depth (RKB) Bottom Depth (RKB) Full Return? Vol Cement... Top Plug? Btm Plug? Surface Casing Cement 36.7 2,320.7 Yes 100.0 Yes Yes Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Sump (psi) Recipe Stroke in) Rotated? - Pipe RPM (rpm) 8 8 8 520.0 1,060.0 No No Tagged Depth (RKB) Tag Method Depth Plug Drilled Out To (MB) Drill Out Diameter (in) Comment Tested cmt lines to 3000 psi and pumped 75.1 bbl of 10.5 ppg MudPush. Dropped the bottom plug and pumped 281.5 bbl of 11 ppg LightCREAT cmt, followed by 60 bbl of class G 15.8 ppg cmt. Dropped the bottom plug and chased w/ 20 bbl of H2O. Swapped over to rig pumps and displaced with 198.2 bbl of 10.1 ppg mud at 8 bpm, 600-800 psi. bumped the plug w/ 1050 psi and held for 5 min. Checked floats and held. Full returns w/ 100 bbl of good clot to surface were observed. "CIP @ 22:47" Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (RKB)Est atm(RKB) Amount (sacks) Class Volume Pumps I (bbl) Lead Cement 36.7 1,820.0 1,009 LightCREAT 281.5 Yield (R /sack) Mix H2O Ratio (gal/n... Free Water (%) Densitypoigal) Plastic Viscosity (Pais) Thickening Time (hr) Cmprstr 1 (psi) 1.91 6.76 11.00 5.00 Additives Additive Type ConcentrationConc Unit label Antifoam D046 0.2 %BWOC Additive Type ConcentrationConc Unit label Fluid Loss Control D167 0.5 %BWOC Additive Type Concentration I Conc Unit label Dispersant D185 0.06 gal/sx Fluid Fluid Type Fluid Description Estimated Top (RKB)Est Btm (kK6) Amount (sacks) Class Volume Pumped (bbl) Tail Cement 1,820.0 2,320.7 270 G 1 60.0 Yield (R /sack) Mix H2O Ratio (gadsa... Free water (%) Density (lbrgal) Plastic Viscosity (Pa-s) Thickening Time (hr) Cmprstr t (psi) 1.16 15.80 5.00 Additives Additive Type Concentration Conc Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Conc Unit label Dispersant D065 0.3 %BWOC Additive Type Concentration Conc Unit label Fluid Loss Control D167 0.4 %BWOC Page 1/1 - Report Printed: 8116/2017 Cement Detail Report CD5-314X String: Intermediate Casing Cement Job: DRILLING ORIGINAL, 6/11/201700:00 Cement Details Description Cementing Starr Date Cementing End Date Wellbore Name Intermediate Casing Cement 7121201 7 1 000 7/2/2017 1500 CD5-314X Comment Mix and pump 20 We of 13 ppb Mud Push II. Drop bottom plug with 300 psi rupture diaphragm. Mix and pump 47 bills of 15.8# Class "G' slurry with 0.080ga1/sack D177 Retarder for a 19 hr pump time. Drop Solid Body Top plug. Push out plug with 20 We of 8.33 ppg H2O. Chase with 10.8 ppg mud with #2 Mud Pump Start out at 4.5 bpm for 400stks then reduce to 4bpm. At 4,885 stks, reduce pump rate to 30 spm when the pressure started to rise abruptly. Continue to manage flow rate to keep pressure below 1300psi and 100% returns. Reduce flow rate to 1.8 bpm at 5748 stks, 1.5 bpm at 6073 stks and then 1 bpm unit) bumping the plug at 6594 stks FCP 1,200 psi. Pressure up to 1700 psi for 5 min. Bleed off pressure and check floats- Good. CIP @1424 hrs. No Fluid losses during job. Cement Stages stage # 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Rsturn? Vol Cement... Top Plug? Btm Plug? Intermediate Casing 14,380.0 14,986.0 No Yes Yes Cement O Pump Init (bbllm... O Pump Final (bbl/... O Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 4 1 4 1,200.0 1,200.0 No No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (MB) Drill Out Diameter (in) Comment Cement intermediate casing Cement Fluids & Additives Fluid Fluid Type Fluitl Description Estimated Top (ftKB) Est Bfm (ftKB) Amount (sacks) Class Volume Pum petl (bbl) Intermediate Cement 14,380.0 14,986.0 230 G 1 47.1 Yield (ft /sack) Mix H2O Ratio (gal/ea... Free Water (%) Density (Ib/ga0 Plastic Viscosity (Pa•s) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.02 15.80 126.0 19.50 Additives Additive Type Conciintration Conc Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Conc Unit label Dispersant D065 0.3 %BWOC Additive Type Concentration Conc Unit label Fluid Loss Control D167 0.4 %BWOC Additive Type Concentration Conc Unit label Retarder D177 0.08 gallsx Page 1/1 Report Printed: 8/16/2017 Page 111 Report Printed: 8/1612017 Cement Detail Report CD5-314X String: Conductor Cement Job: DRILLING ORIGINAL, 6/11/2017 00:00 Cement Details Description Conductor Cement Cementing Start Date 4/1/201700:00 Cementing End Date 4/1/201700:00 Wellbore Name CD5-314X Comment Cement Stages Stage # 1 Description Conductor Cement Objective Top Depth (ftKB) Bottom Depth (ftKB) 36.7 115.0 Full Return? No Vol Cement... I Top Plug? No Btm Plug? No Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) ReciP7 No Stroke (ft) I Rotated? I No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (W/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa-s) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Cone Unit label Page 111 Report Printed: 8/1612017 RECEIVED AUG 2 2017 ergerAOGCC Transmittal#: 22AUG17-SP01 Drilling & Measurements DATA LOGGED Product Delivery a 7_9120 I M K. BENDED Customer: ConocoPhiIlips Alaska Dispatched To: AOGCC: Makana Bender Well Name: CD5-314X Date Dispatched: 22 -Aug -17 Service Order #: 16AKA0041 Dispatched By: Stephanie Pacillo Product Description Handcopy Digital Copy Logging Date Color Log Prints: 4 Contents on CD 19 -Jul -17 Scope Resistivity 2" MD x x 2" TVD x x 5" MD x x 5" TVD x x Digital Data N/A Contents on CD DLIS / LAS Data x Surveys 2 Contents on CD Directional Survey Nad27 x x Directional Survey Nad83 x x CD 1 Contents on CD Data: DLIS/ LAS x Graphics: PDF x Surveys: PDFITXT x Please sign and email a copy to: Please sign and email a copy to: Tom.Osterkamp a(7.conocophillips.com Alaska PTS PrintCenterna.slb.com Attn: Tom Osterkamp Attn: Stephanie Pacillo Received By: 6_..? 21 7021 28535 21 7021 28535 RECEIVED AUG 2 2 2017 FINAL AOGCC NADConversion Western North Slope CD5 Alpine West Pad CD5-314X CD5-314X Definitive Survey Report 07 August, 2017 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CDS-314X Database: OAKEDMP2 'roject Western North Slope, North Slope Alaska, United States Nap System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Seo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Nap Zone: Alaska Zone 04 Using geodetic scale factor Well CD5-314X Tie On Depth: 36.55 Depth From (TVD) Well Position +N/ -S 0.00 call Northing: lush) (1) +EI -W 0.00 usft Easting: Position Uncertainty (usft) Survey (Wellbore) 0.00 usft Wellhead Elevation: 5,965,843.98 usft Latitude: 70° 18'49.610 N 349,284.20 usft Longitude: 151° 13'17,464W 0.00 usft Ground Level: 33.80 usft Wellbore CD5-314X Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1 0 (nT) BGGM2017 6/20/2017 17.12 80.79 57,456.57 Design CD5-314X Audit Notes: Version: 1.0 Vertical Section: Phase: ACTUAL Tie On Depth: 36.55 Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) lush) (1) 36.55 0.00 0.00 172.00 Survey Program Date From To (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 111.48 1,349.79 CD5-314X Srvy 1 -SLB GWD70 (CD5-31 GYD-GC-SS Gyrodata gyro single shots 6/11/2017 9:42.1 1,407.06 2,246.17 CD5-314X Srvy 2 - SLB _MWD+GMAG (C MWD+IFR-AK-CAZ-SC MWD+IFRAK CAZ SCC 6/12/2017 11:03: 2,344.40 14,923.09 CD5-314X Srvy 3-SLB_MWD+GMAG(C Section MWD+IFR-AK-CAZ-SC MWD+IFRAK CAZ SCC 6/16/2017 9:57: 14,986.00 17,756.16 CD5-314X Srvy 4-SLB_MWD+GMAG(C (usft) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 7/4/2017 1510 17,855.40 21,285.51 CD5-314X Srvy 5-SL13 MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 7/9/2017 10: 11:C 21,380.19 26,950.13 CDS-314X Srvy 6 -SLB MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 7/13/2017 8:32: Survey Map Map Vertical MD Inc AN TVD TVDSS +NI -S +E/.W Northing Easting DLS Section (usft) 0 (1 (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 36.55 0.00 0.00 36.55 -33.80 0.00 0.00 5,965,843.98 349,284.20 0.00 0.00 UNDEFINED 111.48 0.24 34.23 111.48 41.13 0.13 0.09 5,965,844.11 349284.29 0.32 -0.12 GYD-GC-SS(1) 145.44 0.11 103.81 145.44 75.09 0.18 0.16 5.965,844.16 349,284.36 0.67 -0.16 GYD-GC-SS(1) 156.56 0.18 100.03 156.56 86.21 0.18 0.19 5.965.844.15 349,284.39 0.64 -0.15 GYD-GC-SS(1) 202.73 0.32 143.31 202.73 132.38 0.06 0.34 5,965,844.03 349,284.54 0.49 -0.01 GYD-GC-SS (1) 27048 0.93 163.46 270.47 200.12 -0.62 0.81 5.965,843.35 349,284.79 0.94 0.70 GYD-GC-SS(1) 294.91 1.11 166.61 294.90 224.55 -1.04 0.72 5,965,842.92 349.284.90 0.77 1.13 GYD-GC-SS(1) 344.62 2.14 169.36 344.59 274.24 -2.42 1.00 5,965,841.54 349,285.15 2.08 2.54 GYD-GC-SS(1) 38685 2.17 169.72 386.59 316.24 -3.97 1.29 5.965,839.98 349,285.41 0.08 4.12 GYD-GC-SS(1) 435.06 2.37 17343 434.96 364.61 -5.87 1.56 5.965,838.08 349.285.65 0.51 6.03 GYD-GC-SS(1) 8/72017 9:21: 15AM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +NIS +E/ -W Northing Easting US Section (usft) (°) (") (usft) (usft) (usft) (usft) (ft) (ft) ("/100') (ft) Survey Tool Name 477.89 2.38 179.28 477.76 407.41 -7.64 1.68 5,965,836.31 349,285.72 0.57 7.80 GYD-GC-SS(1) 566.27 3.73 183.66 566.01 495.66 -12,34 1.52 5,965.83L61 349,285.47 1.55 1243 GYD-GC-SS(1) 600.44 3.85 185.16 600.10 529.75 -14.80 1.34 5,965,829.36 349,285.25 0.46 14.64 GYD-GC-SS(1) 692.95 5.12 18802 692.33 621.98 -21.78 0.49 5,965,822.20 349,284.25 1.39 21.63 GYD-GC-SS(1) 784.97 7.27 192.27 783.81 71346 -31.53 -1.32 5,965,812.48 349.282.25 2.39 31.04 GYD-GC-SS(1) 879.53 11.46 194.22 877.09 806.74 -4649 -4.90 5,965,797.60 349,278.37 4.44 45.36 GYD-GC-SS(1) 973.03 13.66 19489 968.34 897.99 -66.17 -10.02 5,965,778.03 349,272.85 2.36 64.13 GYD-GC-SS(1) 1,067.15 15.21 194.29 1.059.49 989.14 -88.87 -15.93 5,965,755.45 349,266.49 1.65 85.79 GYD-GC-SS(1) 1.160.80 17.19 194.65 1,149.42 1,079.07 -114.17 -22.46 5,965,730.29 349,259.46 2.12 109.93 GYD-GC-SS(1) 1,255.33 19.29 194.86 1,239.19 1.168.84 -142.78 -30.00 5,965,701.84 349,251.35 2.22 137.22 GYD-GC-SS(1) 1,349.79 20.36 195.24 1,328.05 1,257.70 -173.72 -38.32 5.965,671.08 349,242.41 1.14 166.69 GYD-GC-SS (1) 1,407.06 20.54 195.34 1,381.71 1,311.36 -193.02 43.60 5,965,651.89 349,236.74 0.32 185.07 MWD+IFR-AK-CAZ-SC(2) 1,501.99 21.71 195.09 1,470.26 1,399.91 -226.03 -52.57 5.965,619.07 349,227.11 1.24 216.51 MWD+IFR-AK-CAZ-SC(2) 1,595.51 23.90 191.34 1,556.47 1,486.12 -261.31 -60.80 5,965,583.96 349,218.17 2.81 250.31 MWD+IFR-AK-CAZ-SC(2) 1,689.65 25.79 190.74 1,641.89 1,571.54 -300.13 -68.37 5,965,545.30 349,209.83 2.03 287.70 MWD+IFR-AK-CAZ-SC(2) 1.784.00 27.43 191.94 1,726.25 1,655.90 -341.56 -76.69 5,965,504.05 349,200.68 1.83 327.57 MWD+IFR-AK-CAZ-SC(2) 1,876.64 28.61 193.03 1,808.03 1,737.68 -384.05 -86.11 5,965,461.76 349,190.41 1.39 368.33 MWD+IFR-AK-CAZ-SC(2) 1,971.00 31.08 195.78 1,889.87 1,819.52 429.51 -97.83 5,965,416.55 349,177.78 2.99 411.71 MWD+IFR-AK-CAZ-SC(2) 2,064.35 31.36 196.63 1,969.70 1,899.35 -475.97 -111.33 5,965,370.37 349,163.35 0.56 455.84 MWD+IFR-AK-CAZ-SC(2) 2,159.16 33.81 199.72 2,049.59 1,979.24 -524.45 -127.29 5,965,322.23 349,146.42 3.12 $01.63 MWD+IFR-AK-CAZ-SC(2) 2,246.17 34.31 201 AS 2,121.67 2,051.32 -570.03 -144.51 5.965,277.00 349,128.29 1.37 544.37 MWD+IFR-AK-CAZ-SC(2) 2.321.00 35.72 202.20 2,182.96 2,112.61 -609.86 -160.54 5.965.237.51 349.111.46 1.93 581.58 NOT anAchalSlxv4y 10-3/4" x 13-1/2" 2,344.40 36.16 202.36 2.201.90 2,131.55 -622.57 -165.75 5,965,224.91 349,106.00 1.93 593.44 MWD+IFR-AK-CAZ-SC(3) 2,442.03 39.57 202.34 2,278.97 2.208.62 -67799 -188.53 5,965,169.96 349,082.11 3.49 645.15 MWD+IFR-AK-CAZ-SC(3) 2,537.54 42.30 202.65 2,351.11 2,280.76 -735.80 -212A8 5,965,112.65 349,057.01 2.87 69906 MWD+IFR-AK-CAZ-SC(3) 2.633.38 44.93 203.11 2,420.49 2,350.14 -796.70 -238.19 5,965,052.28 349,030.09 2.76 755.79 MWD+IFR-AK-CAZ-SC (3) 2.727.28 48.07 203.85 2,485.12 2.414.77 -859.16 -265.33 5,964.990.38 349,001.70 3.39 813.87 MWD+IFR-AK-CAZ-SC(3) 2,821.17 50.92 204.94 2,546.10 2,475.75 -924.16 -294.83 5,964,925.99 348,970.91 3.16 874.13 MWD+IFR-AK-CAZ-SC(3) 2,915.06 53.39 20640 2,603.70 2,533.35 -990.97 -326.95 5,964,859.85 348.937.45 2.90 935.82 MWD+IFR-AK-CAZ-SC(3) 3,00679 56.10 206.73 2,657.80 2,587.45 -1,059.42 -361.18 5.964,792.10 348,901.85 2.91 998.84 MWD+IFR-AK-CAZ-SC(3) 3,102.56 58.34 207.84 2,708.57 2,638.22 -1,129.47 -397.33 5,964,722.79 348,864.31 2.59 L063.18 MWD+IFR-AK-CAZ-SC(3) 3.196.75 60.72 209.01 2,756.33 2,685.98 -1,200.86 435.98 5,964,652.20 348,824.24 2.74 1,128.49 MWD+IFR-AK-CAZ-SC(3) 3,289.83 6327 210.79 2,800.03 2,729.68 -1,272.08 476.95 6964,581.82 348,781.85 3.22 1,193.32 MWD+IFR-AK-CAZ-SC(3) 3,385.90 64.78 212.03 2.842.11 2,771.76 -1,345.78 -521.96 5,964,509.04 348,735.37 1.95 1,260.04 MWD+IFR-AK-CAZ-SC(3) 3,480.68 65.27 212.64 2,882.13 2,81178 -1,418.38 -567.92 5,964,437.39 348,687.97 0.78 1,325.53 MWD+IFR-AK-CAZ-SC(3) 3,574.83 65.31 213.48 2,921.48 2,851.13 -1,490.06 -614.58 5,964,366.67 348,639.89 0.81 1,390.02 MWD+IFR-AK-CAZ-SC(3) 3,669.94 65.27 214.49 2,961.24 2,890.89 -1,561.70 -662.87 5.964,296.01 348,590.17 0.97 1,454.25 MWD+IFR-AK-CAZ-SC(3) 3,763.34 65.34 214.69 3,000.27 2,929.92 -1,631.56 -711.05 5,964,227.14 348,540.60 0.21 1,516.72 MWD+IFR-AK-CAZ-SC(3) 3,857.31 65.27 213.48 3,039.53 2,969.18 -1.702.26 -758.89 5,964,157.42 348,491.35 1.17 1,580.08 MWD+IFR-AK-CAZ-SC(3) 8/7!2017 9:21:16AM Page 3 COMPASS 5000.14 Build 85 Survey 1 ConocoPhillips � Definitive Survey Report Map Company: NADConversion Local Coordinate Reference: Well CD5-314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey 8/72017 9:21:16AM Page 4 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +El -W Northing Easting DLS Section (usft) V) V) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 3,951.97 65.20 212.48 3,079.18 3,008.83 -1,774.37 -805.68 5,964,086.27 348,443.13 0.96 1,644.97 MWD+IFR-AK-CAZ-SC(3) 4.041.97 65.30 212.54 3.116.86 3,045.51 -1.843.29 -849.61 5,964,018.25 348,397.83 0.13 1,707.11 MWD+IFR-AK-CAZ-SC(3) 4,136.11 65.34 212.15 3,156.17 3,085.82 -1,915.56 -895.37 5,963.946.92 348,350.63 0.38 1,772.31 MWD+IFR-AK-CAZ-SC(3) 4,230.59 64.78 211.07 3,196.01 3.125.66 -1,988.52 -940.27 5,963,874.88 348,304.27 1.19 1,838.30 MWD+IFR-AK-CAZ-SC(3) 4,324.59 64.89 211.00 3,235.98 3.165.63 -2,061.42 -984.14 5,963,802.88 348,258.96 0.14 1,904.39 MWD+IFR-AK-CAZ-SC(3) 4,416.67 64.76 210.53 3,275.15 3,204.80 -2,133.02 -1,026.76 5,963,732.15 348,214.91 0.48 1,969.37 MWD+IFR-AK-CAZ-SC(3) 4.510.75 64.83 209.88 3.315.21 3,244.86 -2,206.59 -1,069.59 5,963,659.47 348,170.62 0.63 2,036.25 MWD+IFR-AK-CAZ-SC(3) 4,605.09 64.73 210.16 3,355.41 3.285.06 -2,280.49 -1,112.29 5,963.586.45 348,126.45 0.29 2,103.49 MWD+IFR-AK-CAZ-SC(3) 4,699.43 64.77 209.78 3,395.65 3.325.30 -2,354.40 -1,154.91 5,963,513.41 348,082.35 0.37 2,170.76 MWD+IFR-AK-CAZ-SC(3) 4.794.30 64.82 208.77 3,436.06 3,365.71 -2,429.28 -1.196.89 5,963.439.40 348,038.89 096 2,239.06 MWD+IFR-AK-CAZ-SC(3) 4,888.22 64.83 207.77 3.476.01 3,405.66 -2,504.13 -1,237.14 5,963,365.37 347,997.14 0.96 2.307.59 MWD+IFR-AK-CAZ-SC(3) 4.982.97 64.68 207.03 3,516.42 3,446.07 -2,580.22 -1,276.58 5.963,290.09 347.956.18 0.72 2,377.44 MWD+IFR-AK-CAZ-SC(3) 5,077.52 64.24 207.44 3.557.18 3,486.83 -2,656.07 -1,31562 5,963,215.04 347,915.63 061 2,47.12 MWD+IFR-AK-CAZ-SC(3) 5,170.99 64.22 208.95 3,597.82 3,527.47 -2,730.26 -1,355.39 5,963,141.68 347,874.38 1.45 2515.05 MWD+IFR-AK-CAZ-SC(3) 5,265.57 64.09 208.60 3,639.05 3,568.70 -2,804.87 -1,396.37 5,963.06791 347,831,92 0.36 2,583.23 MWD+IFR-AK-CAZ-SC(3) 5,360.44 6426 207.72 3.680.38 3.610.03 -2,880.15 -1,43667 5,962,993.46 347,790.12 0.85 2,652.18 MWD+IFR-AK-CAZ-SC(3) 5,454.65 64.32 207.67 3,721.25 3,650.90 -2.955.31 -1,476.12 5,962,919.11 347.749.17 0.08 2,721.11 MWD+IFR-AK-CAZ-SC(3) 5,546.09 64.38 207.83 3,760.83 3.690.48 -3.028.26 -1,514.50 5,962,846.95 347,709.34 0.17 2,788.01 MWD+IFR-AK-CAZ-SC(3) 5,643.94 64.38 208.35 3,803.14 3,732.79 -3,106.10 -1,556.04 5,962,769.97 347,666.25 0.48 2,859.31 MWD+IFR-AK-CA7-SC(3) 5,738.52 64.41 208.62 3.844.02 3.773.67 -3,181.08 -1,596.72 5,962,695.84 347,62407 0.26 2,927.88 MWD+IFR-AK-CAZ-SC(3) 5,831.97 64.35 209.89 3,884.43 3,814.08 -3,254.57 -1,637.90 5,962.823.18 347,581.43 1.23 2,994.95 MWD+IFR-AK-CAZ-SC(3) 5,926.29 64.42 211.94 3,925.21 3,854.86 -3,327.54 -1,681.59 5,962,551.11 347,536.29 1.96 3,061.12 MWD+IFR-AK-CA7-SC(3) 6,020.35 6438 213.77 3,865.85 3,895.50 -3.398.79 -1,727.61 5,962,480.80 347.488.85 1.76 3,125.28 MWD+IFR-AK-CAZ-SC(3) 6114.75 64.39 215.05 4,006.67 3,936.32 -3.469.02 -1.775.71 5,962,411.56 347,439.36 1.22 3.188.12 MWD+IFR-AK-CAZ-SC(3) 6,209.37 64.28 215.23 4,47.65 3,977.30 -3,538.76 -1.824.80 5,962.342.82 347,388.88 0.21 3250.36 MWD+IFR-AK-CAZ-SC(3) 6,30342 64.32 214.47 4,08843 4.018.08 -3,608.30 -1,873.22 5.962,274.27 347,339.07 0.73 3,312.49 MWD+IFR-AK-CAZ-SC(3) 6,398.07 64.29 213.47 4,129.47 4,059.12 -3,679.04 -1,920.88 5,962,204.51 347,290.01 0.95 3,375.90 MWD+IFR-AK-CAZ-SC(3) 6,492.00 64.29 212.80 4,170.22 4,099.87 -3,749.90 -1,967.14 5,962,134.59 347,242.34 0.64 3,439.64 MWD+IFR-AK-CAZ-SC(3) 6,586.12 64.26 211 74 4,211.07 4,140.72 -3,821.60 -2,012.41 5,962,063.83 347,195.64 1.02 3,504.33 MWD+IFR-AK-CAZ-SC (3) 6,677.13 64.26 210.32 4,250.60 4,180.25 -3,891.84 -2,054.67 5.961.994.45 347,151 99 1.41 3,568.01 MWD+IFR-AK-CAZ-SC (3) 6,772.15 64.30 20996 4,291.84 4,221.49 -3,965.88 -2,097.65 5,961,921.30 347,107.53 0.34 3,635.34 MWD+IFR-AK-CAZ-SC(3) 6,866.80 64.35 210.74 4,332.85 4,262.50 -4,039.49 -2,140.75 5,961,848.57 347,062.96 0.74 3,702.24 MWD+IFR-AK-CAZ-SC(3) 6,960.12 64.29 210.32 4,373.29 4,302.94 -4,111.93 -2,183.48 5,961,777.01 347,018.80 0.41 3,768.03 MWD+IFR-AK-CAZ-SC (3) 7,055.03 64.25 209.34 4,414.49 4.344.14 4,186.10 -2,226.00 5,961,703.71 346,974.79 0.93 3,835.56 MWD+IFR-AK-CAZ-SC(3) 7,149.46 64.35 208.10 4,455.44 4,385.09 4,26072 -2,266.89 5,961,629.93 346,932.42 1.19 3,903.77 MWD+IFR-AK-CAZ-SC(3) 7242.82 64.38 207.48 4.495.83 4,425.48 4,335.18 -2.306.13 5,961,556.28 346891.69 0.60 3,972.04 MWD+IFR-AK-CAZ-SC(3) 7,337.74 64.34 206.91 4.536.91 4,466.56 -4,411.30 -2,345.24 5,961,480.97 346,851.06 0.54 4,041.97 MWD+IFR-AK-CAZ-SC(3) 7,432.11 64.36 206.66 4,577.76 4,50741 .4,487.24 -2.383.58 5,961,40582 346,811.21 0.24 4,111.84 MWD+IFR-AK-CAZ-SG(3) 7,526.59 64.32 206.90 4,618.67 4,548.32 -4,563.27 -2,421.95 5,961,330.58 346,771.33 0.23 4,181.79 MWD+IFR-AK-CAZ-SC(3) 7,621.14 64.32 206.90 4,659.64 4,589.29 4,639.26 -2,460.50 5,961,255.39 346,731.26 0.00 4,251.67 MWD+IFR-AK-CAZ-SC(3) 8/72017 9:21:16AM Page 4 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well C05 -314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +NI -S +EI•W Northing Easting DLS Section (usft) V) V) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 7,713.16 64.35 207.18 4,699,50 4,629.15 -4,713.13 -2,498.21 5,961.182.29 346,692.08 0.28 4,319.58 MWD+IFR-AK-CAZ-SC(3) 7,807.50 64.32 208.66 4.740.36 4,670.01 -4,788.26 -2,538.02 5,961,107.98 346,650.77 1,41 4,388.44 MWD+IFR-AK-CAZ-8C (3) 7,902,00 64.35 209.66 4.781.29 4,710.94 -4,862.64 -2,579.52 5,961,034.45 346,607.79 0.95 4,456.32 MWD+IFR-AK-CAZ-SC(3) 7,996.38 6435 210.65 4,822.14 4,751.79 -4,936.21 -2,622.26 5,960.961.76 346,563.59 0.95 4,523.22 MWD+IFR-AK-CAZ-SC(3) 8,091.22 64,37 212.72 4,863,19 4,792.84 -5,008.96 -2,667.17 5,960,889.93 346,517.23 1.97 4,589.02 MWD+IFR-AK-CAZ-SC (3) 8,184.51 64.35 213.00 4,903.55 4,833.20 -5,079.61 -2,712.80 5,960,820.22 346,470.19 0.27 4,652,62 MWD+IFR-AK-CAZ-SC 13) 8,278.78 64.36 212.87 4,944.35 4,874,00 -5,150.93 -2,759.01 5,960,749.84 346,422.57 0.12 4.716.83 MWD+IFR-AK-CAZ-SC(3) 8,373.01 64.33 212.73 4,985.15 4,914.80 -5,222.33 -2,805.02 5,960,679.39 346,375.14 0.14 4,781.12 MWD+IFR-AK-CAZ-SC(3) 8.467.62 63.80 213.04 5,026.53 4,956.18 -5,293.78 -2,851.21 5,960,608.89 346,327.52 0.63 4,845.45 MWD+IFR-AK-CAZ-SC(3) 8,561.48 63.84 212.37 5,067.94 4,997.59 -5,364.66 -2,896.73 5,960,538.94 346,280.60 0.64 4,909.30 MWD+IFR-AK-CAZ-SC (3) 8,654.80 63.85 210.94 5,109.08 5.038.73 -5.435.96 -2,940.68 5,960,46854 346,235.22 1.38 4,973.79 MWD+IFR-AK-CAZ-SC(3) 8,745.10 63.80 210.36 5,148.91 5,078.56 -5,505.67 -2.982.00 5,960.399.67 346,192.52 0.58 5,037.08 MWD+IFR-AK-CAZ-SC(3) 8,838.53 63.99 210.72 5,190.02 5,119.67 -5,577.93 -3,024.63 5,960,328.29 346,148.45 0.40 5,102.70 MWD+IFR-AK-CAZ-SC(3) 8,933.22 64.26 210.10 5,231.34 5,160.99 -5,651.41 -3,067.75 5.960,255.70 346,103.86 0.65 5,169.46 MWD+IFR-AK-CAZ-SC (3) 9,027.93 64.29 209.87 5,272.45 5,202.10 -5.725.31 -3,110.40 5.960,182.67 346,059.75 0.22 5,236.71 MWD+IFR-AK-CAZ-SC(3) 9.122.09 64.31 209.17 5,313.29 5,24294 -5,799,14 -3,15220 5,960.109.70 346,016,47 0.67 5,304.01 MWD+IFR-AK-CAZ-SC(3) 9,216.27 64.42 209.73 5,354.03 5.283.68 -5,873.08 -3,193.95 5,960,036.62 345,973.25. 0.55 5,371,41 MWD+IFR-AK-CAZ-SC(3) 9,310.86 64,32 209.62 5,394,95 5,324.60 -5,947.18 -3,236.17 5,959,963.39 345,929.56 0.15 5,438.91 MWD+IFR-AK-CAZ-SC(3) 9,405.15 64.35 209.68 5,435.79 5,365.44 -6,021.04 -3,278.21 5,959.89040 345,88604 0.07 5,506.20 MWD+IFR-AK-CAZ-SC(3) 9,499.24 64.28 210.11 5,476.57 5,406.22 -6,094.55 -3,320.48 5,959,817.76 345,842.32 0.42 5,573.12 MWD+IFR-AK-CAZ-SC(3) 9,593.15 64.26 21036 5,517.34 5,446.99 .6,167.64 -3,363.07 5,959,745.54 345,798.26 0.24 5,639.57 MWD+IFR-AK-CAZ-SC(3) 9,687.54 6428 210,98 5,55831 5,487.96 -6,240.78 -3,406.45 5,959.673.29 345,75343 0.59 5,705.96 MWD+IFR-AK-CAZ-SC(3) 9,781,78 64.32 210.80 5,599.18 5,52883 -6,31365 -3,450.04 5,959,601.32 345,708.38 0.18 5,772.05 MWD+IFR-AK-CAZ-SC(3) 9,874.11 64.32 210.68 5,639.19 5,568.84 -6,385.17 -3,492.58 5,959,530.67 345.664.43 0.12 5,836.95 MWD+IFR-AK-CAZ-SC(3) 9,970.58 64.26 210.73 5,681.04 5,610.69 -6,459.90 -3,536.96 5,959.456.85 345,618.56 0.08 5,904.78 MWD+IFR-AK-CA2-SC(3) 10,065.18 64.31 210.72 5,722.09 5.651.74 -6,533.17 -3,580.51 5,959,384.48 345,573.55 0.05 5,971.28 MWD+IFR-AK-CAZ-SC(3) 10,159.14 64.29 210.92 5,762.84 5,692.49 -6,605.88 -3,623.88 5,959.312.66 345,528,73 0.19 6,037.24 MWD+IFR-AK-CAZ-SC 13) 10.252.55 64.32 210.84 5,803.34 5,732.99 -6,678,12 -3,667.08 5,959,241.30 345,484.09 0.08 6,102.77 MWD+IFR-AK-CAZ-SC(3) 10,347.36 64.33 210.87 5,844.41 5,774.06 -6,751.47 -3,710.91 5,959,168.85 345,438.80 0.03 6,169.31 MWD+IFR-AK-CAZ-SC(3) 10.441,84 64.29 210.55 5,885.37 5,815.02 -6,824.67 -3,754.39 5.959,096.54 345,393.67 0.31 6,235.75 MWD+IFR-AK-CAZ-SC(3) 10,536.77 64.33 209.79 5,926.52 5,856.17 -6,898.63 -3,797.38 5,959,023.47 345,349.40 0.72 6,303.00 MWD+IFR-AK-CAZ-SC(3) 10,631.01 6430 209,14 5.967.37 5,897.02 -6,972.57 -3,839.16 5,958,9$0.38 345,306.15 062 6,370.41 MWD+IFR-AK-CAZ-SC(3) 10.725.09 64.26 209.23 6,008.20 5,937.85 -7,046.57 -3,880.49 5,958,877.23 345,263.35 0.10 6,437.94 MWD+IFR-AK-CAZ-SC(3) 10.818.93 64.29 209.50 6,048.93 5.978.58 -7,120.25 -3,921.94 5,958,804.41 345,220.43 0.26 6,505.13 MWD+IFR-AK-CAZ-SC(3) 10,913.21 64.27 210.16 6,089.85 6,019.50 -7,193.94 -3,964.19 5,958,731.59 345,176.71 0.63 6,572.22 MWD+IFR-AK-CAZ-SC(3) 11,006.27 64.13 210.10 6.130.35 6.060.00 -7,266.40 -4,006.25 5,958,659.99 345,133.21 0.16 6,638.12 MWD+IFR-AK-CA7-SC(3) 11,100,40 64.22 209.13 6,171.35 6,101.00 -7,340.06 -4,048.12 5,958,587.19 345,089.87 0.93 6,705.24 MWD+IFR-AK-CAZ-SC (3) 11,194,05 64.36 209,12 6.211.98 6,141.63 -7,413.77 4,089.19 5,958,514.33 345,047.34 0.15 6,772.51 MWD+IFR-AK-CAZ-SC(3) 11,288.36 64.29 209.96 6,252.84 6,182.49 -7,487.72 4,131.09 5,958,441.24 345,003.96 0.81 6,839.91 MWD+IFR-AK-CAZ-SC(3) 11,383.07 64.32 210.83 6,293.91 6,223.56 -7,561.33 -4,174.28 5,958,368.52 344,959.31 0.83 6,906.80 MWD+IFR-AK-CAZ-SC(3) 81712017 9:21: 16AM Page 5 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey Map Map Vertical MO Inc AZI TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (it) (°/100') (ft) Survey Tool Name 11,475.39 64.26 210.85 6,333.96 6,263.61 -7,632.75 -4,216.92 5,958,297.97 344,915.25 0.07 6,971.59 MWD+IFR-AK-CAZ-SC(3) 11,570.03 64.22 211.14 6,375.09 6,304.74 -7,705.61 -4,260.81 5,958,225.81 344,869.90 0,28 7,037.83 MWD+IFR-AK-CAZ-SC(3) 11,663.84 64.23 211.29 6,41508 6,345.53 -7,778.06 4.304.59 5,958,154.46 344.824.68 0.14 7,103.28 MWD+IFR-AK-CAZ-SC(3) 11,758.22 64.26 210,96 6,45689 6,386,54 -7,850.83 -4,348.53 5.958,082.60 344,779.29 0.32 7,169.23 MWD+IFR-AK-CAZ-SC(3) 11,852,63 64.33 210.42 6,497.84 6,427.49 -7,923.98 -4,391.95 5,958,010.33 344,734.42 0.52 7,235.62 MWD+IFR-AK-CAZ-SC(3) 11,947.09 64.16 209.88 6,538.89 6,468.54 -7,997.55 -4,434,68 5,957,937.65 344,690.23 0.55 7,302.53 MWD+IFR-AK-CAZ-SC(3) 12.040.41 64.33 210.14 6,579.44 6,509.09 -8,070.33 -4.476.72 5,957,865.73 344,646.74 0.31 7,368.75 MWD+IFR-AK-CAZ-SC(3) 12,134.74 64.26 210.77 6,620.35 6,550,00 -8,14360 -4,519.80 5.957.793.35 344,60220 0.61 7,435.31 MWD+IFR-AK-CAZ-SC(3) 12,229.70 64.29 210,79 6.661.57 6,591.22 -8,217.09 -4,563.57 5,957,720.75 344,556.96 0.04 7,502.00 MWD+IFR-AK-CAZ-SC(3) 12,323.24 64,19 210.88 6,702.22 6,631.87 -8,289.43 -4,606.75 5.957,649.30 344,512.34 0.14 7,567.62 MWD+IFR-AK-CAZ-SC(3) 12.416.80 64.23 211.24 6,742.93 6,672.58 -8,361.59 4,650.22 5,957,578.03 344,467.44 0.35 7.633.03 MWD+IFR-AK-CAZ-SC(3) 12,511.15 64.26 211.54 6,78392 6,713.57 -8,434.13 -4,694.48 5,957.506.40 344,421,73 0.29 7,698.71 MWD+IFR-AK-CAZ-SC(3) 12,605.49 64.27 211.21 6,824,89 6,754.54 -8,50669 -4.738.72 5,957,434.75 344,376.04 0.32 7,764.40 MWD+IFR-AK-CAZ-SC(3) 12,700.22 64.32 210.90 6,865.98 6,795.63 -8,579.81 -4,782.76 5,957,362.53 344,330.56 0,30 7.830.68 MWD+IFR-AK-CAZ-SC 0) 12,793.91 64.32 210.48 6,906.58 6,836.23 -8,65242 4,825.85 5,957,291/_80 344,286.02 0.40 7.896.59 MWD+IFR-AK-CAZ-SC(3) 12,888,17 64.73 208.67 6,947.12 6,876.77 -8.726.43 4,867.85 5.957,217.66 344,242.55 1.79 7,964,03 MWD+IFR-AK-CAZ-SC(3) 12,982.12 65.52 206.17 6,986.65 6,916.30 -8,802.08 -4,907.09 5,957,142.82 344,201.80 2.56 8,033.48 MWD+IFR-AK-CAZ-SC(3) 13,076.48 66.59 203.51 7,024.95 6,954.60 -8,88033 -4,943.30 5,957,065.31 344,164.02 281 8,105.93 MWD+IFR-AK-CAZ-SC(3) 13,171.09 67.34 201,05 7,061.97 6,991.62 -8,960.89 4,976,30 5,956,985.44 344,129.41 2.52 8,181.12 MWD+IFR-AK-CAZ-SC(3) 13,265.81 67.88 198.01 7,098.06 7,027.71 -9,043.42 -5,005.57 5,956,903.52 344,098.49 3.02 8,258.77 MWD+IFR-AK-CAZ-SC(3) 13,359.66 68,99 193.80 7,132.57 7,062.22 -9,127.34 -5,029.47 5,956,820.11 344,072.92 4.34 8,338.54 MWD+IFR-AK-CAZ-SC(3) 13,454.25 70.16 189.45 7,165.59 7,095.24 -9214.14 -5,047.32 5,956.73369 344,053.34 4.48 8,422.02 MWD+IFR-AK-CAZ-SC(3) 13,548.16 72.00 185.44 7,196,05 7,125.70 -9,30220 -5,058.81 5,956,645.88 344,040.08 4.49 8,507.62 MWD+IFR-AK-CA7-SC(3) 13.641.40 73.38 182.54 7,223.80 7,153.45 -9,390.99 -5,064.99 5,956,557.24 344,032.12 3.32 8,594.69 MWD+IFR-AK-CAZ-SC(3) 13,736.10 74.72 180.02 7.249.83 7,179.48 -9,482.01 -5,067.02 5,956,466.28 344,028.26 2.92 8,664.54 MWD+IFR-AK-CAZ-SC(3) 13,830.53 75.60 178.04 7,274.01 7,203.66 -9.573.27 -5,06547 5,956.375.02 344,027.98 2.23 8,775.13 MWD+IFR-AK-CAZ-SC(3) 13,924.81 76.47 176.59 7,296.77 7,226,42 -9.664.66 -5,061.18 5,956,283.57 344,030.43 1.75 8,866.23 MWD+IFR-AK-CAZ-SC(3) 14,019.17 77.89 176.15 7.317.70 7,247.35 -9,756.48 -5,055.36 5.956.191.65 344,03441 1.57 8,957.96 MWD+IFR-AK-CAZ-SC.(3) 14,113.60 79.27 17577 7,338.40 7.266.05 -9,848,81 -5,048.83 5,956,099.22 344,039.08 1.51 9,050.30 MWD+IFR-AK-CAZ-SC(3) 14,208.14 81.60 175.26 7,352.11 7281.76 -9,941.74 -5,041.54 5,956,006.17 344,044.50 2.52 9,143.34 MWD+IFR-AK-CAZ-SC(3) 14,303.03 8290 175.78 7,364.90 7,294.55 -10,035.48 -5,034.20 5,955,912.31 344,049.96 1.47 9,237.19 MWD+IFR-AK-CAZ-SC(3) 14,397.37 84.61 173.99 7,375.17 7,304.82 -10,128.88 -5,025.84 5,955,818.77 344,056.45 2,62 9,330.84 MWD+1FR-AK-CAZ-SC(3) 14,491.55 85.71 173.95 7,383.11 7,312.76 -10.22220 -5,015.98 5,955,725.27 344,064.43 1.17 9,424,63 MWD+IFR-AK-CAZ-SC(3) 14,586.25 86.08 173.94 7,389.89 7,319.54 -10,316.13 -5.006.02 5,955,631.17 344,072.51 0.39 9,519,03 MWD+IFR-AK-CAZ-SC(3) 14.680.51 85.95 174.17 7,396,44 7,326.09 -10,409.66 4,996.28 5,955,537.47 344,080.37 0.28 9,613.00 MWD+IFR-AK-CAZ-SC(3) 14,774.84 86.28 175.27 7,402.83 7,332.48 -10,503.37 4,987.62 5,955,443.61 344,087.14 1,21 9,707.01 MWD+IFR-AK-CAZ-SC(3) 14,869.96 86.13 174.71 7,409.13 7,338.78 -10,597.92 -4,979.33 5,955,348,93 344,093.53 0.61 9,801.79 MWD+IFR-AK-CAZ-SC(3) 14,923.09 86,75 175.34 7,412.43 7,342.08 -10,650,74 4,974.73 5,955,296.02 344,09707 1.66 9.854.74 MWD+1FR-AK-CAZ-SC(3) 14,976,00 90.12 177.95 7,413.87 7,343.52 -10,703.53 -4,971,64 5,955,243.19 344,099.10 8.06 9.907.45 NOT an Actual Survey 7-6/8" x 9-7/8 by 10-1/2 8/72017 9:21:16AM Page 6 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConveision Local Coordinate Reference: Well CD5-314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CDS Alpine West Pad MD Reference: C05 -314X: 33.8+36.55 @ 70.35usfl (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azl TVD TVDSS +N/ -S +E/.W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 14,996.31 91.42 178.95 7,413.60 7,343.25 -10,723.83 4,971.09 5,955,222.88 344,099.24 8.06 9,927.63 MWD+IFR-AK-CAZ-SC(4) 15,091.72 89.82 174.13 7.412.57 7,342.22 -10.819.03 4.965.33 5,955,127.59 344,103.09 5.32 10,022.70 MWD+IFR-AK-CAZ-SC(4) 15,187.23 89.63 169.97 7,413.02 7,342.67 -10,913.60 -4.952.12 5.955,032.78 344,114.39 4.36 10,118.19 MWD+IFR-AK-CAZ-SC(4) 15.283.10 89.28 167.09 7,413.94 7,343.59 -11,OOZ54 -4,933.06 5,954.938.48 344,131.56 3.03 10,213.87 MWD+1FR-AK-CAZ-SC(4) 15,377.17 89.43 163.73 7,415.00 7,344.65 -11,098.56 4,909.37 5,954.847.02 344.153.42 3.58 10,307.30 MWD+IFR-AK-CAZ-SC(4) 15,472.80 89.39 163.43 7.415.98 7,345.83 -11,190.28 4,882.34 5,954,754.77 344,176.60 0.32 10,401.89 MWD+IFR-AK-CAZ-SC(4) 15,568.79 89.15 162.87 7,417.20 7,346.85 -11,282.15 -4,854.52 5,954,662.38 344,204.57 0.63 10,496.73 MWD+IFR-AK-CAZ-SC(4) 15.664.30 89.68 167.20 7,418.18 7,347.83 -11,374.39 -4.82986 5,954,569.67 344,227.37 4.57 10,591.51 MWD+IFR-AK-CAZ-SC(4) 15,759.91 89.42 169.32 7,418.93 7,348.58 -11.467.99 4,810.41 5,954.475.70 344,244.94 2.23 10,686.91 MWD+IFR-AK-CAZ-SC(4) 15,855.22 8956 172.53 7,419.78 7,349.43 -11,562.09 4.795.38 5,954,381.32 344,258.08 3.37 10,782.18 MWD+1FR-AK-CAZ-SC(4) 15,950.39 89.64 174.53 7,420.44 7,350.09 -11,656.65 -4,784.66 5,954,286.58 344,266.90 2.10 10,877.31 MWD+IFR-AK-CAZ-SC(4) 16,044.40 89.21 177.77 7,421.39 7,351.04 -11,750.43 -4.778.34 5,954,192.70 344,271.33 3.48 10.971.06 MWD+IFR-AK-CAZ-SC(4) 16,139.88 89.41 180.71 7.422.54 7,352.19 -11,845.88 -4,777.08 5,954.097.24 344,270.68 3.09 11.065.76 MWD+IFR-AK-CAZ-SC(4) 16,235.16 89.19 177.48 7,423.70 7,353.35 -11,941.13 4,775.57 5,954,001.99 344,270.27 3.40 11,160.29 MM+IFR-AK-CAZ-SC(4) 16.329.78 89.39 180.01 7,424.87 7,354.52 -12,035.71 4,773.50 5,953,907.39 344,270.44 2.68 11,254.24 MWD+IFR-AK-CAZ-8C(4) 18,425.63 90.23 181.34 7.425.19 7,354.84 -12,131.55 4.774.63 5,953,811.60 344,267.39 1.64 11,348.99 MWD+IFR-AK-CAZ-SC(4) 16,520.37 89.87 181.09 7.425.11 7,354.76 -12.226.27 -4,776.64 5,953,716.95 344,263.48 0.46 11.442.51 MWD+IFR-AK-CAZ-SC(4) 16,616.42 89.78 180.14 7,425.40 7,355.05 -12.322.31 4,777.67 5.953,620.95 344,280.52 0.99 11,537.47 MWD+IFR-AK-CAZ-SC(4) 16.711.43 88.78 177.10 7,426.60 7,356.25 -12.417.28 4,775.38 5,953,525.97 344,260.90 3.37 11,631.83 MWD+IFR-AK-CAZ-SC(4) 16,806.23 90.13 172.00 7,427.50 7,357.15 -12,511.61 -4.766.38 5.953.431.48 344,268.01 5.56 11,726.50 MWD+IFR-AK-CAZ-SC(4) 16,901.54 90.40 169.33 7,427.06 7,356.71 -12,605.65 -4.750.92 5,953,337.16 344.281.57 2.82 11,821.77 MWD+IFR-AK-CAZ-SC(4) 16.996.91 89.09 165.07 7,427.48 7,357.13 -12,698.62 -4,729.80 5.953,243.79 344,300.83 4.67 11,916.78 MWD+IFR-AK-CAZ-SC(4) 17,091.59 89.41 160.93 7.428.72 7,358.37 -12,789.14 4,702.13 5,953,152.74 344.326.68 4.39 12,010.27 MWD+IFR-AK-CAZ-SC(4) 17,186.81 88.44 160.14 7,430.51 7,360.16 -12,678.90 -4.670.40 5,953,062.37 344.356.59 1.31 12,103.57 MWD+IFR-AK-CAZ-SC(4) 17,284.64 89.25 161.55 7,432.42 7,362.07 -12,968.46 -4,639.29 5.952,972.21 344.385.89 1.71 12,196.59 MWD+IFR-AK-CAZ-SC(4) 17.377.32 87.88 162.49 7.434.82 7,364.47 -13,059.43 -4,609.77 5,952,880.67 344,413.58 1.74 12,290.78 MWD+IFR-AK-CAZ-SC(4) 17,471.33 86.50 167.00 7,439.43 7,369.08 -13,150.00 -4,585.07 5,952,789.64 344,436.46 5.01 12,383.90 MWD+IFR-AK-CAZ-SC(4) 17,566.83 91.98 171.09 7,440.69 7,370.34 -13,243.69 4,566.94 5.952,695.60 344452.71 7.16 12.479.21 MWD+IFR-AK-CAZ-SC(4) 17,662.30 90.94 172.63 7,438.26 7.367.91 -13,338.17 4.55342 5,952,600.86 344,464.32 1.95 12,574.65 MWD+IFR-AK-CAZ-SC(4) 17,756.16 8988 174.28 7,437.75 7,367.40 -13,43141 -4,542.72 5,952,507.45 344.473.14 2.21 12,668.47 MWD+IFR-AK-CAZ-SC(4) 17,855.40 89.24 173.14 7,438.69 7,368.34 -13,530.04 -4.531.85 5,952,408.62 344,482.03 1.23 12,767.66 MWD+IFR-AK-CAZ-SC(5) 17,953.11 90.16 171.49 7.439.20 7,368.85 -13.626.87 -4,518.79 5952,311.56 344,493.15 1.93 12,865.36 MWD+IFR-AK-CAZ-SC(5) 18,048.52 90.41 169.43 7,438.73 7,368.38 -13,720.96 -4.502.98 5,952,217.19 344,507.07 2.17 12,960.73 MWD+IFR-AK-CAZ-SC(5) 18,143.27 89.62 165.86 7,438.70 7,368.35 -13.81350 4,482.71 5,952,124.27 344,525.48 3.86 13,055.19 MWD+IFR-AK-CAZ-SC(5) 18,238.09 90.65 165.02 7,438.48 7.368.13 -13,905.27 4,458.87 5,952,032.04 344,547.47 1.40 13.149.39 MWD+IFR-AK-CAZ-SC(5) 18,333.67 88.78 170.43 7,438.95 7.368.60 -13,998.62 -4.438.56 5,951,938.30 344,565.90 5.99 13,244.66 MWD+IFR-AK-CAZ-SC(5) 18,428.89 89.27 175.25 7,440.57 7,370.22 -14,093.06 4,426.69 5,951,843.65 344,575.86 5.09 13,339.83 MWD+IFR-AK-CAZ-SC(5) 18,524.01 89.26 176.88 7,441.79 7,371.44 -14,187.94 4,420.17 5,951,748.67 344,580.48 1.71 13,434.70 MWD+IFR-AK-CAZ-SC(5) 18,619.75 89.42 178.93 7,442.90 7,372.55 -14.283.61 4,416.67 5,951,652.96 344,582.06 2.15 13.529.92 MWD+IFR-AK-CAZ-SC(5) 18,715.81 90.52 180.26 7,442.95 7,372.60 -14,379.66 -4,415.99 5,951,556.92 344,580.81 1.80 13,625.13 MWD+IFR-AK-CAZ-SC(5) 8/72017 9:21:16AM Page 7 COMPASS 5000.14 Build 65 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CDS-314X North Reference: True Wellbore: CDS-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +NIS +E/ -W Northing Easting DLS Section (usft) (°) 11 (usft) (usft) (usft) (usft) (ft) (ft) ('1100') (ft) Survey Tool Name 18,810.67 90.27 187.23 7,442.29 7,371.94 -14,474.26 -4,422.18 5,951,462.47 344,572.72 7.35 13,717.95 MWD+IFR-AK-CAZ-SC(5) 18,905.74 90.86 180.61 7,441.35 7,371.00 -14,569.05 4,428.68 5,951,367.84 344,564.33 6.99 13,810.91 MWD+IFR-AK-CAZ-SC(5) 19000.03 90.33 174.78 7,440.37 7,370.02 -14,663.22 4424,89 5.951,273.62 344,566.23 6.21 13,904.69 MWD+IFR-AK-CAZ-SC(5) 19,095.60 89.56 173.67 7,440.47 7,370.12 -14,758.30 4,415.27 5,951,178.37 344,573.93 1.41 14,000.18 MWD+IFR-AK-CAZ-SC(5) 19,190.23 89.56 175.03 7,441.19 7,370.84 -14,85246 -4,405.95 5,951,084.04 344,581.35 1.44 14,094.73 MWD+IFR-AK-CAZ-SC(5) 19,285.14 88.05 174.26 7,443.17 7,372.82 -14,946.94 -4,397.10 5,950,98942 344588.31 1.79 14,189.52 MWD+IFR-AK-CAZ-SC(5) 19,382.08 90.08 172.98 7.444.75 7,374.40 -15,043.26 -4,386.33 5,950,892.91 344.597.15 2.48 14.286.40 MWD+IFR-AK-CAZ-SC(5) 19,476.28 89.98 173.18 7,444.70 7,374.35 -15.136.77 4,374.98 5,950,799.19 344,606.61 0.24 14,380.58 MWD+IFR-AK-CAZ-SC(5) 19,571.88 90.21 171.69 7.444.55 7,374.20 -15,23153 4,362.39 5,950,704.20 344,617.29 1.58 14,476.17 MWD+IFR-AK-CAZ-SC(5) 19,666.57 89.94 169.61 7,444.42 7.374.07 -15,324.96 -4,347.01 5,950,610.49 344630.80 2.22 14,570.83 MWD+IFR-AK-CAZ-SC(5) 19,761.81 90.13 166.49 7,444.36 7,374.01 -15,418.13 -4,32729 5,950,516.96 344648.64 3.28 14665.83 MWD+IFR-AK-CAZ-SC(5) 19,857.20 90.02 16803 7,444.24 7,373.89 -15,511.16 -4,306.26 5,950,423.52 344.667.80 182 14,760.90 MWD+IFR-AK-CAZ-SC(5) 19,952.98 89.81 17505 7.444.38 7,374.03 -15,605.84 -4,292.17 5,950,328.59 344,679.98 7.33 14,856.61 MWD+IFR-AK-CAZ-SC(5) 20,048.10 89.79 176.35 7,444.71 7,374.36 -15,700.69 4,285.04 5,950,233.62 344,685.21 1.37 14,951.53 MWD+IFR-AK-CAZ-SC(5) 20.143.12 89.15 173.73 7,445.59 7,375.24 -15,795.34 4,276.83 5,950,138.83 344,691.52 2.84 15,046.40 MWD+IFR-AK-CAZ-SC(5) 20,239.78 89.09 168.20 7.447.08 7,376.73 -15,890.76 -4,261.66 5,950,043.14 344,704.77 5.72 15,143.00 MWD+IFR-AK-CAZ-SC(5) 20,335.00 89.31 165.66 7,448.41 7,378.06 -15,983.49 -4,240.13 5,949,950.00 344724.43 2.68 15,237.83 MWD+IFR-AK-CAZ-SC(5) 20,430.11 89.01 166.34 7,449.80 7,379.45 -16,075.77 -4,217.12 5,949,857.29 344.745.58 0.78 15,332.41 MWD+IFR-AK-CAZ-SC(5) 20,525.30 89.68 171.44 7,450.89 7,380.54 -16,169.13 -4,198.79 5,949,753.58 344.762.04 5.40 15,427.42 MWD+IFR-AK-CAZ-SC(5) 20,620.15 89.71 177.30 7,451.40 7,381.05 -16,263.48 -4,189.49 5,949,66907 344,769.44 6.18 15,522.15 MWD+IFR-AK-CAZ-SC(5) 20,716.18 89.49 181.24 7,452.07 7,381.72 -16,359.49 4,168.26 5,949,573.07 344,768.74 4.11 15,617.38 MWD+IFR-AK-CAZ-SC(5) 20,811.09 90.05 182.27 7,45245 7,382.10 -16,454.35 4,191.17 5,949,478.29 344,763.93 1.24 15,710.92 MWD+IFR-AK-CAZ-SC(5) 20,906.35 90.57 184.74 7,451.93 7.381.58 -16,549.42 -4,19699 5,949,383.36 344,756.20 2.65 15,804.26 MWD+IFR-AK-CAZ-SC(5) 21,001.13 91.38 182.63 7,450.32 7,379.97 -16,643.99 -4,20308 5,949,28894 344.748.21 2.38 15,897.05 MWD+IFR-AK-CAZ-SC(5) 21,095.62 90.40 182.51 7,448.85 7,378.50 -16,738.37 -4,207.32 5,949,194.67 344,742.08 1.04 15,989.93 MWD+IFR-AK-CAZ-SC(5) 21,190.81 89.07 184.08 7.449.29 7,378.94 -16,833.39 4,212.79 5,949,099.78 344,734.71 2.16 16.083.27 MWD+IFR-AK-CAZ-SC(5) 21,285.51 89.99 179.77 7,450.07 7,379.72 -16,928.01 4,215.97 5,949,005.25 344,729.63 4.65 16,176.52 MWD+IFR-AK-CAZ-SC(5) 21,380.19 87.50 178.53 7,452.14 7,381.79 -17,022.65 4,214.57 5,948,910.61 344,729.13 2.94 16,270.43 MWD+IFR-AK-CAZ-SC(6) 21,474.40 88.22 17721 7,455.66 7,385.31 -17,116.73 4,21107 5,948,816.49 344,730.74 1.60 16,364.08 MWD+IFR-AK-CAZ-SC(6) 21,569.21 88.87 174.78 7,458.07 7,387.72 47,211.27 -4,20445 5,948,721.84 344,735.46 265 16,458.62 MWD+IFR-AK-CAZ-SC(6) 21,665.25 89.55 173.02 7,459.39 7,389.04 -17,306.75 -4,194.24 5,948,626.18 344,743.75 1.96 16,554.60 MWD+IFR-AK-CAZ-SC(6) 21,759.81 89.93 171.61 7,459.82 7,389.47 -17,400.46 -4,181.60 5,948,532.25 344,754.51 1.54 16,649.15 MWD+IFR-AK-CAZ-SC(6) 21,855.14 89.62 170.53 7,460.20 7,389.85 -17,494.63 -4,166.80 5,948,437.80 344,767.41 1.18 16,744.47 MWD+IFR-AK-CAZ-SC(6) 21,950.48 89.52 169.64 7,460.91 7,390.56 47,588.54 4,150.38 5,948,343.59 344,781.94 0.94 16,839.75 MWD+IFR-AK-CAZ-SC(6) 22,046.23 89.55 169.38 7.461.69 7,391.34 -17,682.69 4132.95 5,948.249.12 344,797.47 0.27 16,935.41 MWD+IFR-AK-CAZ-SC.(6) 22,141.47 90.15 172.53 7,461.94 7.391.59 -17,77673 4,11798 5.948,154.80 344,810.55 3.37 17,030.62 MWD+IFR-AK-CAZ-SC(6) 22,236.11 90.03 172.05 7,461.79 7,391.44 -17,870.52 -4,105.29 5,948,060.79 344,821.36 0.52 17,125.26 MWD+IFR-AK-CAZ-SC(6) 22,331.54 89.31 170.61 7,462.34 7,391.99 -17,964.85 -4,090.90 5,947.966.19 344,833.85 1+69 17,220.68 MWD+IFR-AK-CAZ-SC(6) 22,426.68 89.11 168.63 7,463.65 7,393.30 -18,058.42 -4,073.76 5,947,872.30 344.849.11 2.09 17,315.72 MWD+IFR-AK-CAZ-SC(6) 22,522.18 88.66 165.00 7,465.51 7,395.16 -18,151.37 4,051.99 5,947,778.94 344,869.01 3.83 17,410.80 MWD+IFR-AK-CAZ-SC(6) 617/2017 9:21: 16AM Page 8 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N1 -S +E/ -W Northing Easting DLS Section (usft) 0 (1) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 22.617.56 89.01 164.82 7,467.45 7,397.10 -18,243.44 -4.027.16 5,947,686.40 344,891.98 0.41 17,505,43 MWD+IFR-AK-CAZ-SC(6) 22,712,47 88.73 165.04 7,469.32 7.398.97 -18,335.07 .4.002.49 5,947,594.30 344,914.81 0.38 17,599.60 MWD+IFR-AK-CAZ-SC(6) 22,808.73 89.00 165.37 7,471.23 7,400.88 -18,428.12 -3,977.91 5,947,500.78 344,937.51 0.44 17,695.16 MWD+IFR-AK-CAZ-SC(6) 22.903.93 89.97 169.63 7,472.08 7.401.73 -18,521.04 -3.957.31 5,947,40747 344,956.24 4.59 17,790.04 MWD+IFR-AK-CAZ-SC(6) 22.99849 89.68 173.99 7,472.37 7,402.02 -18,614.61 -3.943.85 5,947,313.66 344,967.82 4.62 17,884.58 MWD+IFR-AK-CAZ-SC(6) 23.094.67 87.61 174.73 7,474.65 2404.30 -18,710.29 -3.934.40 5,947,217.81 344,975.35 2.29 17,980.64 MWD+IFR-AK-CAZ-SC (6) 23,189.86 91.06 174.83 7,475.75 7,405.40 -18.805.07 -3,925.74 5,947,122.89 344,982.10 3.63 18,075.70 MWD+IFR-AK-CAZ-SC(6) 23.284.55 91.20 174.24 7,473.89 7,403,54 -18,899.31 -3.916.72 5,947,028.49 344,989.23 0.64 18,170.28 MWD+IFR-AK-CAZ-SC(6) 23.380.59 90.75 173.01 7,472.25 7,401.90 -18,994.74 -3,906.06 5,946,932.88 344,997.97 1.36 18,266.26 MWD+IFR-AK-CAZ-SC(6) 23,475.19 90.65 171.62 7,471.10 7,40075 -19.088,48 -3,893.41 5,946,838.91 345,008.73 1.47 18,360.85 MWD+IFR-AK-CAZ-SC(6) 23,570.80 89.16 165.58 7,471.25 7,400.90 -19,182,16 -3,874.52 5,946,744.88 345.025,74 6.51 18,456.25 MWD+IFR-AK-CAZ-SC(6) 23,665.22 89.94 162.32 7,472.00 7,401.65 -19,272,88 -3,848.42 5,946,653.65 345,050,01 3.55 18,549.72 MW0+IFR-AK-CAZ-SC(6) 23,761.24 89.59 160.56 7,472,39 7,402.04 -19,363.90 -3,817.86 5,946,562.04 345.078.73 1.87 18,644.11 MWD+IFR-AK-CA7-SC(6) 23,856.70 89.25 15889 7,473.36 7,403.01 -19,453,44 -3,784.78 5.946,47187 345,110,01 1.79 18.737.38 MWD+IFR-AK-CAZ-SC(6) 23,951.78 89,18 159.40 7,474.66 7,404.31 -19.542.28 -3,750.94 5,946,382.37 345,142.06 0.54 18,830.07 MWD+IFR-AK-CAZ-SC(6) 24,046,65 88.82 161.04 7,476.31 7,405.96 -19,63154 -3,718.84 5,946,292.50 345,172.36 1.77 18,922.92 MWD+IFR-AK-CAZ-SC(6) 24,140.98 90.39 164.60 7,476.96 7,406.61 -19,721.64 -3,690.98 5946,201.86 345,19840 4.12 19,016.02 MWD+IFR-AK-CAZ-SC(6) 24,237.65 90,34 166.47 7,476.35 7.406.00 -19,815.24 -3,666.84 5.946,107.80 345,220.66 1.94 19,112.07 MWD+IFR-AK-CAZ-SC(6) 24.333.20 89.97 166.44 7,476.09 7,405.74 -19,908.13 -3.644.46 5,946,014.49 345,241.17 0.39 19,207.18 MWD+IFR-AK-CAZ-SC(6) 24,428.50 90.45 168.78 7,475.74 7,405.39 -20,00120 -3,624.01 5,945,921.03 345,259.74 2.51 19,302.19 MWD+IFR-AK-CAZ-SC(6) 24,523.55 89.47 173,65 7,475.81 7,405.46 -20,095.11 -3,609.50 5,945,826.86 345,272.36 5.23 19,397.20 MWD+IFR-AK-CAZ-SC(6) 24,618.66 89.73 178,65 7,476.47 7,406.12 -20,189.97 -3,603.12 5,945,731.89 345,276.84 5.26 19,492,03 MWD+IFR-AK-CAZ-SC(6) 24,713.64 90.06 181.80 7,476.65 7,406.30 -20,285.14 -3.603.49 5,945.636.76 345,274.56 3.33 19,58622 MWD+IFR-AK-CAZ-SC (6) 24,809.61 89.09 18041 7,477.36 7,407.01 -20,380.88 -3.605.34 5,945.541.08 345,270.79 1.77 19,680,77 MWD+IFR-AK-CAZ-SC(6) 24,904.73 90.67 179.42 7,477.56 7,407.21 -20,476.00 -3,605.20 5,945.445.98 345,269.02 1.96 19,774,98 MWD+1FR-AK-CAZ-SC(6) 25,000.07 89.66 177.81 7.47228 7,406.93 -20,571.31 -3.602.89 5,945,350.66 345,269.41 199 19,869.68 MWD+IFR-AK-CAZ-SC(6) 25,095.49 91.65 173.75 7,476.19 7,405.84 -20,66644 -3,59587 5,945,255.41 345.274.52 4.74 19,964.87 MWD+IFR-AK-CAZ-SC(6) 25,191.21 89.68 170.24 7,475.08 7,404.73 -20,761.20 -3.582.55 5,945,160.41 345,285.94 4.20 20,060.56 MWD+IFR-AK-CAZ-SC(6) 25,285.78 88.62 164.26 7,476.48 7,406.13 -20,853.38 -3,561.69 5,945,067.83 345.304.94 6.42 20,154.75 MWD+IFR-AK-CAZ-SC(6) 25,380.91 89.24 160.24 7,478.26 7,407.91 -20,943.95 -3,532.70 5,944,976.71 345,332.11 4.28 20,248.47 MWD+IFR-AK-CAZ-SC(6) 25,476.12 89.14 164,17 7,479.61 7,409.26 -21,03458 -3,503.61 5,944,885.52 345,35937 4.13 20,342.26 MWD+IFR-AK-CAZ-SC(6) 25,571.30 89.21 172.33 7,480.98 7,410.63 -21,127.68 -3,484.24 5,944,792.06 345,376.86 8.57 20,437.15 MWD+IFR-AK-CAZ-SC(6) 25,667.94 89.49 177.50 7,482.08 7,411.73 -21,223.90 -3,475.68 5,944,695,69 345,383.49 5.36 20,533.63 MWD+IFR-AK-CAZ-SC(6) 25,762.32 90.54 183.31 7,482.05 7,411.70 -21,318.23 -3,476.35 5,944,601,40 345,380.93 6.26 20,626.95 MWD+IFR-AK-CAZ-SC(6) 25,857.50 89.69 176.67 7,481.86 7,411.51 -21,413.36 -3,476.33 5,944,506.30 345,379,03 7.03 20,721.15 MWD+IFR-AK-CAZ-SC(6) 25,953.72 89.67 169.47 7,482.40 7,412.05 -21,508.81 -3,464.73 5,944,410.64 345,388,72 7.48 20,817.29 MWD+IFR-AK-CAZ-SC(6) 26,048.31 87.91 163.73 7,484.40 7,414.05 -21,600.76 -3,442.83 5,944,318.27 345.408.77 6.35 20,911.40 MWD+IFR-AK-CAZ-SC(6) 26,143.27 89.98 171.91 7.486.15 7,415.80 -21,693.49 -3,422.81 5,944,225.17 345,426.91 888 21,006.00 MWD+IFR-AK-CAZ-SC(6) 26,239,12 89,21 175.58 7,486.83 7.416.48 -21,788.75 -3,412.37 5,944,129.73 345,435.44 3.91 21,101.79 MWD+IFR-AK-CAZ-SC(6) 26,333.94 89.43 172.37 7,487.95 2417.60 -21,883.02 -3.402.42 5,944,035.28 345,443.50 3.39 21,196.53 MWD+IFR-AK-CAZ-SC(6) 8!72017 921:16AM Page 9 COMPASS 5000.14 Build 85 Survey ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-314X Project: Westem North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CDS-314X : 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DES Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 26,429.61 89.69 175.22 7,488.69 7,418.34 -21,978.12 -3,392.08 5,943,940.00 345,451.92 2.99 21.292.14 MWD+IFR-AK-CAZ-SC (6) 26,525.67 89.49 179.26 7,489.37 7,419.02 -22,074.05 -3,387.46 5,943,844.01 345,454.62 4.21 21,387.78 MWD+IFR-AK-CAZ-SC (6) 26,621.83 89.59 178.29 7,490.15 7,419.80 -22,170.18 -3,385.40 5,943,747.86 345,454.75 1.01 21.483.27 MWD+IFR-AK-CAZ-SC(6) 26,716.50 89.13 174.98 7,491.20 7,420.85 -2226467 -3.379.85 5,943,653.29 345,458.41 3.53 21,577.61 MWD+IFR-AK-CAZ-SC(6) 26,812.02 89.57 170.16 7,492.29 7,421.94 -22,359.35 -3.367.50 5,943,558.38 345,468.85 5.07 21,673.09 MWD+IFR-AK-CAZ-SC(6) 26,907.58 89.28 170.33 7,493.25 7,422.90 -22,453.53 -3,351.31 5,943,463.91 345,483.14 0.35 21,768.60 MWD+IFR-AK-CAZ-SC(6) 26,950.13 89.57 172.03 7,493.67 7,423.32 -22,495.57 -3.344.79 5,943,421.75 345,498.82 4.05 21,811.14 MWD+IFR-AK-CAZ-SC(6) 27.000.00 89.57 172.03 7,494.05 7,423.70 -22,544.96 -3,337.87 5,943,372.23 345,494.74 0.00 21.86101 NOT an Actual Surrey 4-1/2'x 6-3/4" 27,010.00 89.57 172.03 7.494.12 7,423.77 -22,554.86 -3,336.48 5,943,362.31 345,495.93 0.00 21.87101 PROJECTED to TD Final Definitive Survey Verified and Signed -off All targets and/or well position objectives have been achieved. [ Yes [] No I have checked to the best of my ability that the following data is correct Surface Coordinates Declination & Convergence GRS Survey Corrections Survey Tool Codes u9 in IN:geed by Mtdon Brandon Temple �. m SLB DE: 17.o6.mItot.o,-�,�, William Earhart®t�an agiolNsgred try Will6m Client Representative: N0em,'M.m 1414"0800 Data 8/7/2017 81712017 9:21:16AM Page 10 COMPASS 5000.14 Build 85 z11 7021 RECEIVED 28 5 3 5 AUG 2 2 2011 FINAL AOGcc ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad CD5-314X CD5-314X Definitive Survey Report 04 August, 2017 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope She: CD5 Alpine West Pad Well: CDS-314X Wellbore: CD5-314X Design: CD5-314X ConocoPhillips Definitive Survey Report Local Coordinate Reference: Well CD5-314X TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) North Reference: True Survey Calculation Method: Minimum Curvature Database: OAKEDMP2 'roject Western North Slope, North Slope Alaska, United States Map System: US State Plane 1983 System Datum: Mean Sea Level ;so Datum: North American Datum 1983 Using Well Reference Point Map Zone: Alaska Zone 4 Using geodetic scale factor Veil CD5-314X MWD+IFR AK CAZ SCC From To Audit Notes: (usft) Veil Position +N/ -S 0.00 usft Northing: 5,965,589.94 usft Latitude: 70° 18'48A00 1 36.55 +E/ -W 0.00 usft Easting: 1,489,317.35 usft Longitude: 151' 13'28.777 V 'osilion Uncertainty (usft) 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 33.80 usf Vellbore CDS-314X Magnetics Model Name Sample Date Declination Dip Angle Field Strength (*I 1`) (nT) BGGM2016 6/20/2017 17.10 80.81 57,502.79 Design CD5-314X Data 8/4/2017 MWD+IFR AK CAZ SCC From To Audit Notes: (usft) (usft) Survey (Wellbore) Tool Name 111.48 Version: 1.0 Phase: ACTUAL Tie On Depth: 36.55 Vertical Section: Depth From (TVD) +N/ -S +EI -W Direction MWD+IFR-AK-CAZ-SC (usft) (usft) (usft) (•) 26,950.13 CD5-314X Srvy 6 -SLB MWD+GMAG(C 36.55 0.00 0.00 172.00 vey Program Data 8/4/2017 MWD+IFR AK CAZ SCC From To 6/16/2017 9:57: (usft) (usft) Survey (Wellbore) Tool Name 111.48 1,349.79 CD5-314X Srvy 1 - SLB GWD70 (CD5-31 GYD-GC-SS 1,407.06 2,246.17 CD5-314X Srvy 2 -SLB MWD+GMAG(C MWD+IFR-AK-CAZ-SC 2,344.40 14,923.09 CD5-314X Srvy 3-SLBMWD+GMAG(C MWD+IFR-AK-CAZ-SC 14,986.00 17,756.16 CD5-314X Srvy 4-SLB_MWD+GMAG(C MWD+IFR-AK-CAZ-SC 17,855.40 21,285.51 CDS-314X Srvy 5 - SLB MWD+GMAG (C MWD+IFR-AK-CAZ-SC 21,380.19 26,950.13 CD5-314X Srvy 6 -SLB MWD+GMAG(C MWD+IFR-AK-CAZ-SC Survey Description Survey Date Gyrodata gyro single shots 6/11/2017 9:42:: MWD+IFR AK CAZ SCC 6/12/2017 11:03: MWD+IFR AK CAZ SCC 6/16/2017 9:57: MWD+IFR AK CAZ SCC 7/4/2017 1:51:5 MWD+IFR AK CAZ SCC 7/9/2017 10:11:1 MWD+IFRAKCAZSCC 7/13/2017 8:32:. 8/412017 12:49:28PM Page 2 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting OLS Section (usft) (•) (•) (usft) (usft) (usft) (usft) (ft) (ft) (•1100') (ft) Survey Tool Name 36.55 0.00 0.00 36.55 -33.80 0.00 0.00 5,965,589.94 1,489,317.35 0.00 0.00 UNDEFINED 11148 024 34.23 111.48 41.13 0.13 0.09 5,965,590.07 1,489,317.44 0.32 -0.12 GYD-GC-SS(1) 14544 0.11 103.81 145.44 75.09 0.18 0.16 5,965,590.12 1,489,317.51 0.67 -0.16 GYD-GC-SS(1) 156.56 0.18 10003 156.56 86.21 0.18 0.19 5,965,590.11 1,489,317.54 0.64 -0.15 GYD-GC-SS(1) 202.73 0.32 143.31 202.73 132.38 0,06 0.34 5,965,589.99 1,489,317.69 0.49 -0.01 GYD-GC-SS(1) 270.48 0.93 163.46 270.47 200.12 -0.62 0.61 5,965,589.31 1,489,31794 0.94 0.70 GYD-GC-SS(1) 294.91 1.11 166.61 294.90 224.55 -1.04 0.72 5,965,588.89 1,489,318.05 0.77 1.13 GYD-GC-SS(1) 344.62 2.14 169.36 344.59 274.24 -2.42 1.00 5,965,587.50 1,489,318.30 2.08 2.54 GYD-GC-SS(1) 386.65 2.17 169.72 386.59 316.24 -3.97 1.29 5.965.585.94 1.489.318.56 0.08 4.12 GYD-GC-SS(1) 43506 2.37 173.43 434.96 364.61 -5.67 1.56 5,965.584.04 1.489.318.80 0.51 6.03 GYD-GC-SS(1) 8/412017 12:49:28PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -VVNS Local Co-ordinate Reference: Well CD5-314X Project: VVestem North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35us0 (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +Nl-S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 477.89 2.38 179.28 477.76 407.41 -7.64 1.68 5,965,582.27 1,489,318.87 0.57 7.80 GYD-GC-SS (1) 566.27 3.73 183,66 566.01 495.66 -12.34 1.52 5,965,577.57 1,489,318.62 1.55 12.43 GYD-GC-SS (1) 600.44 3.85 185,16 600.10 529.75 -14.60 1,34 5,965,575.32 1,489,318.40 0.46 14.64 GYD-GC-SS(1) 692.95 5,12 188.D2 692.33 621.98 -21.78 0.49 5,965.568.16 1,489,31740 1.39 21.63 GYD-GC-SS(1) 78407 7.27 192.27 783.81 713.46 -31.53 -1.32 5,965,558.44 1,489,315,39 2.39 31.04 GYD-GC-SS(1) 879,53 11.46 194.22 877.09 806.74 46.49 4.90 5,965,543.56 1,489,311.51 4.44 45.36 GYD-GC-SS (1) 973.03 13.66 194.89 968.34 897.99 -66.17 -10.02 5,965.523.99 1,489,306.00 2.36 64.13 GYD-GC-SS(1) 1,067.15 15.21 194.29 1,059.49 989.14 -88.87 -15.93 5,965,501,41 1,489,299.64 1.65 85.79 GYD-GC-SS(1) 1,160.80 17.19 194.65 1,149.42 1,079.07 -114.17 -22.46 5,965,476.25 1,489,292.60 2.12 109.93 GYD-GC-SS(1) 1,255.33 19.29 194.86 1,239.19 1,168.84 -142.78 -30,00 5,965,447.80 1,489,284.49 222 137.22 GYD-GC-SS(1) 1,349.79 2036 195.24 1,328.05 1.257.70 -173.72 -38.32 5,965,417.04 1,489,275.55 1,14 166.69 GYD-GC-SS(1) 1,407.06 20.54 195.34 1,381.71 1,311.36 -19302 -43.60 5,965,397,85 1,489,269.88 0.32 185.07 MWD+IFR-AK-CAZ-SC(2) 1,501.99 21.71 195.09 1,470.26 1,399.91 -226.03 -52.57 5,965,365.03 1,489,260.24 1.24 216.51 MWD+IFR-AK-CAZ-SC(2) 1,595,51 23.90 191.34 1,556.47 1.486.12 -261.31 -60.80 5,965,329.92 1,489,251.31 2.81 250.31 MWD+IFR-AK-CAZ-SC(2) 1,689,65 25.79 190.74 1,641.89 1,571.54 -300.13 -68.37 5,965,291.26 1,489,242.96 2.03 287.70 MWD+IFR-AK-CAZ-SC(2) 1,784.00 27.43 191,94 1.726.25 1,655,90 -341.56 -76.69 5,965,250.01 1,489,233.81 1.83 32757 MWD+IFR-AK-CAZ-SC(2) 1,876.64 28.61 193.03 1,808.03 1,737.68 -384.05 -86.11 5,965,207.73 1,489,223.54 1.39 368.33 MWD+IFR-AK-CAZ-SC(2) 1,971.00 31.08 195.78 1,889.87 1,819.52 -429.51 -9783 5,965,162.52 1,489,210.91 2.99 411.71 MWD+IFR-AK-CAZ-SC(2) 2,064.35 31.36 196.63 1,969.70 1.899.35 475.97 -111.33 5,965.116.34 1,489,196.47 0.56 455.84 MWD+IFR-AK-CAZ-SC(2) 2.159.16 33.61 199.72 2,049.59 1,979.24 -524.45 -127.29 5,965,06920 1,489,179.54 3.12 501,63 MWD+IFR-AK-CA7-SC(2) 2,246.17 34.31 201.65 2,121.67 2.051.32 -570,03 -144.51 5,965,022.97 1,489,16141 1.37 544.37 MWD+1FR-AK-CAZ-SC(2) 2,321.00 35.72 202.20 2,182.96 2,11261 -609.86 -160.54 5,964,98348 1.489.144.58 1.93 581.58 ppTanAdualSurvey 10-3W'x 13-112" 2,344.40 36.16 202.36 2,201.90 2,131.55 -622.57 -165.75 5,964.97088 1,489,139.12 1.93 593.44 MWD+IFR-AK-CAZ-SC(3) 2,442.03 39.57 202.34 2,278.97 2,208.62 -677.99 -188.53 5,964,915,94 1,489,115.22 349 645.15 MWD+IFR-AK-CAZ-SC(3) 2,537.54 42.30 202.65 2,351.11 2,280.76 -735.80 -212.48 5.964,858.62 1,489.090.12 2.87 699.06 MWD+IFR-AK-CAZ-SC(3) 2.633.38 44.93 203.11 2,420.49 2,350.14 -796.70 -238.19 5,964,798.26 1.489,063.20 2,76 755.79 MWD+IFR-AK-CAZ-SC(3) 2,727.28 48.07 203.85 2,485.12 2,414.77 -859.16 -265.33 5,964,73636 1,489,034.80 3.39 81387 MWD+IFR-AK-CAZ-SC(3) 2,821.17 50.92 204.94 2,546.10 2,475.75 -924.16 -294.83 5,964.671.97 1,489,004.01 3.16 874,13 MWD+IFR-AK-CAZ-SC(3) 2,915.06 53.39 206.40 2,603.70 2,533.35 -990.97 -326.95 5,964,605.83 1,488,970,55 2.90 935.82 MWD+IFR-AK-CAZ-SC(3) 3,008.79 56.10 20673 2,657.80 2587,45 -1,059.42 -361.18 5,964,538.08 1.488,934.95 2.91 998.84 MWD+IFR-AK-CAZ-SC(3) 3,102.56 58,34 207.84 2,708.57 2,638.22 -1,129.47 -397.33 5,964,468.77 1,488,897.40 2.59 1,063.18 MWD+IFR-AK-CAZ-SC(3) 3,196.75 6072 209.01 2,756.33 2,685.98 -1,200.86 -435.98 5,964,398.19 1,488,85733 2.74 1,128.49 MWD+IFR-AK-CAZ-SC(3) 3,289.83 63.27 210.79 2,800.03 2,729.68 -1,272.08 -476.95 5,964,327,81 1,488,814.93 3.22 1,193.32 MWD+IFR-AK-CAZ-SC(3) 3,385.90 64.78 212.03 2.842.11 2,771.76 -1,345.78 -521.96 5,964,255.03 1,488,768.45 1.95 1,260.04 MWD+IFR-AK-CAZ-SC(3) 3,480.68 6527 212.64 2,882.13 2,81178 -1,418.38 -567.92 5,964,183.38 1,488,721.05 0.78 1,325.53 MWD+IFR-AK-CAZ.SC(3) 3,574.83 65.31 213.48 2,921.48 2,851.13 -1,490.06 -614.58 5,964,112.66 1,488,672.96 0.81 1,39D.02 MWD+IFR-AK-CAZ-SC(3) 3,669.94 65.27 214.49 2,961.24 2.890.89 -1,561.70 -662.87 5,964,042.01 1,488,623.24 0.97 1.454.25 MWD+IFR-AK-CAZ-SC(3) 3,763.34 65.34 214.69 3,000.27 2,929.92 -1,631.56 -711.05 5,963,973.14 1.488,573.67 0.21 1,516.72 MWD+IFR-AK-CAZ-SC(3) 3,857.31 65.27 213.48 3,039.53 2,969.18 -1,702.26 -758.89 5,963,903.42 1,488,524.41 1,17 1,580.08 MWD+IFR-AK-CAZ-SC(3) 8/412017 12:49:28PM Page 3 COMPASS 5000.14 Build 85 Company: ConomPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-314X Wellbore: CD5-314X Design: CD5-314X Survey ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: Well CD5-314X TVD Reference: CD5-314X: 33.8+36.55 Q 70.35usft (Doyon 19) MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) North Reference: True Survey Calculation Method: Minimum Curvature Database: OAKEDMP2 Map Map MD Inc Azi TVD TVDSS +N/ -S +EI -W Northing Easting DLS (usft) V) (°) (usft) (usft) (usft) (usft) (ft) (it) (-7100•) 3,951.97 65.20 212.48 3,079.18 3,008.83 -1,774.37 -805.68 5,963,832.28 1,488,476.19 0.98 4,041.97 65.30 212.54 3,116.88 3,046.51 -1,843.29 -849.61 5,963,764.25 1,488,430.89 0.13 4,136.11 65.39 212.15 3,156.17 3,085.82 -1,915.56 -895.37 5,963,692.93 1,488,383.68 0.38 4,230.59 64.78 211.07 3,196.01 3,125.66 -1,988.52 -940.27 5,963,620.89 1,488,337.32 1.19 4,324.59 64.89 211.00 3,235.98 3,165.63 -2,061.42 -984.14 5,963,548.90 1,488,29200 0.14 4,416.67 64.76 210.53 3,275.15 3,204.60 -2,13302 -1,026.76 5,963,478.17 1,488,247.95 0.48 4,510.75 64.83 209.88 3,315.21 3,244.86 -2,206.59 -1,069.59 5,963,405.49 1,488,203.65 0.63 4,605.09 64.73 210.16 3,355.41 3,285.06 -2,280.49 -1112,29 5,963,332.47 1,468,159.48 0.29 4,699.43 64.77 209.78 3.395.65 3,325.30 -2,354.40 -1,154.91 5,963,259.43 1,488,115.38 0.37 4.794.30 6482 208.77 3,436.06 3,365.71 -2,429.28 -1.196.89 5,963,18542 1,488,071.91 0.96 4.888.22 64.83 207.77 3,476.01 3,405.66 -2,504.13 -1.237.14 5,963,111.39 1,488,030.16 0.96 4,982.97 64.68 207.03 3,516.42 3,446.07 -2,580.22 -1,276.58 5,963,036.12 1,487,989.20 0.72 5,077.52 64.24 207.44 3,557.18 3,486.83 -2,656.07 -1.315.62 5,982.961.08 1,487,948.64 0.61 5,170.99 64.22 208.95 3,597.82 3,527.47 -2,73026 -1,35539 5,962,88771 1,487,907.39 1.45 5265.57 64.09 20860 3,639.05 3,568.70 -2,804.87 -1,396.37 5,962,813.95 1.487,864.93 0.36 5,360.44 6426 207.72 3,680.38 861003 -2,880.15 -1,436.67 5.962,739.49 1,487,823.12 085 5,454.65 64.32 207,67 3,721.25 3,650.90 -2,955.31 -1,476.12 5,962,665.15 1,482782.17 0.08 5,546.09 64.38 207.83 3.760.83 3,690.48 -3,028.26 -1,514.50 5,962,592.99 1,487,742.33 0.17 5,643.94 64.38 208.35 3,803.14 3,732.79 -3.106.10 -1,556.04 5.962.516.02 1,487,699.24 0.48 5,738.52 64.41 208.62 3,84402 3,773.67 -3,181.06 -1,596.72 5,962,441.89 1,487,657.06 026 5,831.97 64.35 209.89 3,88443 3.814.08 -3,254.57 -1,637.90 5,962,369.22 1,487,614.42 1.23 5,926.29 64.42 211e4 3,92521 3,854.86 -3,327.54 -1,681,59 5,962,297.16 1,487,569.27 1.96 6,020.35 64.38 213.77 3,965.85 3,895.50 -3,39879 -1,727.61 5,962,226.85 1,487,521.83 1.76 8114.75 64.39 215.05 4,006.67 3,936.32 -3,469.02 -1,775.71 5,962,157.62 1.487.472.33 122 6,209.37 64.28 215.23 4,047.65 3,977.30 -3,538.76 -1,824.80 5.962,088.88 1487,421.85 0.21 6,303.42 64.32 214.47 4,08843 4,018.08 -3,608.30 -1,873.22 5,962,020.33 1,487,372,04 0.73 6,398.07 64.29 213.47 4.129.47 4,059.12 -3,679.04 -1,920.88 5,961.950.57 1,487,322.97 0.95 6,492.00 64.29 212.80 4.170.22 4,099.87 -3,749.90 -1,967.14 5,961,880.66 1,487,275.30 0.64 6,586.12 64.26 211.74 4,211.07 4.140.72 .3,821.60 -2,012.41 5,961,809.89 1.487.22860 1.02 6,677.13 64.26 210.32 4,250.60 4,180.25 -3,891.84 -2,054.67 5,961,740.52 1.487.18494 1.41 6,772.15 6430 209.96 4,291.84 4,221.49 -3,965.88 -2,097.65 5,961,667.37 1,487,140.48 0.34 6,866.80 64.35 210.74 4,332.85 4,262.50 4,039.49 -2,14075 5,961,594.65 1,487,095.90 0.74 6,960.12 64.29 210.32 4,373.29 4,302.94 -4,111.93 -2,183.48 5,961,523.08 1,487,051.73 0.41 7,055.03 64.25 209,34 4.414.49 4,34414 -4,186.10 -2,226.00 5.961,449.79 1,487,007.72 0.93 7,149.46 64.35 208.10 4,455.44 4.385.09 -4,260.72 -2,266.89 5,961,376.01 1,486,965.35 1.19 7,242.82 64.38 20748 4,495.83 4,425.48 -4,335.18 -2,306.13 5,961,302.36 1.486,924.62 0.60 7,337.74 64.34 206.91 4,536.91 4,466.56 -4,411.30 -2.345.24 5,961,227.06 1,486,883.99 0.54 7,432.11 64.36 206.66 4,577.76 4.507.41 4,487.24 -2,383.58 5,961,151.91 1.486,844.13 0.24 7,526.59 64.32 20690 4,618.67 4,548.32 -4,563.27 -2,421.95 5,961,076.67 1,486,804.24 0.23 7,621.14 64.32 206.90 4,659.64 4,589.29 -4,639.26 -2,460.50 5,961,001.48 1,486,764.17 0.00 Vertical Section (ft) Survey Tool Name 1,644.97 MWD+IFR-AK-CAZ-SC(3) 1,707.11 MWD+IFR-AK-CAZ-SC(3) 1,772.31 MWD+IFR-AK-CPZ-SC(3) 1,838.30 MWD+IFR-AK-CAZ-SC(3) 1,904.39 MWD+IFR-AK-CAZ-SC(3) 1,969.37 MWD+IFR-AK-CAZ-SC(3) 2,036.25 MWD+IFR-AK-CAZ-SC(3) 2,103.49 MWD+IFR-AK-CAZ-SC(3) 2,170.76 MWD+IFR-AK-CAZ-SC(3) 2,239.06 MWD+IFR-AK-CAZ-SC(3) 2,307.59 MWD+IFR-AK-CAZ-SC(3) 2,377.44 MWD+IFR-AK-CAZ-SC(3) 2,447.12 MWD+IFR-AK-CAZ-SC (3) 2,515.05 MWD+IFR-AK-CAZ-SC(3) 2,583.23 MWD+IFR-AK-CAZ-SC(3) 2,652.18 MWD+IFR-AK-CAZ-SC(3) 2,721.11 MWD+IFR-AK-CAZ-SC(3) 2,788.01 MWD+IFR-AK-CAZ-SC(3) 2,859.31 MWD+IFR-AK-CAZ-SC(3) 2,927.88 MWD+IFR-AK-CAZ-SC(3) 2.994.95 MWD+IFR-AK-CAZ-SC(3) 3,061.12 MWD+IFR-AK-CAZ-SC (3) 3,125.28 MWD+IFR-AK-CAZ-SC(3) 3.188.12 MWD+IFR-AK-CAZ-SC(3) 3250.36 MWD+IFR-AK-CAZ-SC(3) 3,312.49 MWD+IFR-AK-CAZ-SC(3) 3,375.90 MWD+IFR-AK-CAZ-SC(3) 3,439.64 MWD+IFR-AK-CAZ-SC(3) 3,504.33 MWD+IFR-AK-CA7-SC(3) 3,568.01 MWD+IFR-AK-CAZ-SC(3) 3,635.34 MWD+IFR-AK-CAZ-SC(3) 3,702.24 MWD+IFR-AK-CAZ-SC(3) 3,768.03 MW3+IFR-AK-CAZ-SC(3) 3,835.56 MWD+IFR-AK-CAZ-SC(3) 3,903.77 MWD+IFR-AK-CAZ-SC(3) 3,972.04 MWD+IFR-AK-CAZ-SC(3) 4,041.97 MWD+IFR-AK-CAZ-SC(3) 4,111.84 MWD+IFR-AK-CAZ-SC(3) 4,181.79 MWD+IFR-AK-CAZ-SC(3) 4,251.67 MWD+IFR-AK-CAZ-SC (3) 8/4/2017 12:49:28PM Page 4 COMPASS 5000.14 Build 85 Company: ConowPhillips(Alaska) Inc.-WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-314X Wellbore: CDS-314X Design: CD5-314X Survey ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: Well CD5-314X TVD Reference: CD5-314X: 33,8+36.55 Q 70,35usf1(Doyon 19) MO Reference: CD5-314X: 33.8+36.55 @ 70.35usfl (Doyon 19) North Reference: True Survey Calculation Method: Minimum Curvature Database: OAKEDMP2 Map Map MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') 7,713.16 64.35 207.18 4,699.50 4829.15 -4,713.13 -2,498.21 5,960,928.38 1,486.72499 0.28 7,807.50 64.32 208.66 4,740.36 4,670.01 -4,788.26 -2,538.02 5,960,854.07 1,486,683.68 1.41 7,902.00 64.35 209.66 4,781.29 4,710.94 -4,862.64 -2,579.52 5.960,780.55 1,486.640.69 0.95 7,996.38 64.35 210.65 4,822.14 4,751.79 -4,936.21 -2,622.26 5,960.707.86 1,486,596.48 0.95 8,091.22 64.37 212.72 4,863.19 4,792.84 -5,008.96 -2,667.17 5,960,636,04 1,486,550.12 1.97 8,184.51 64.35 213.00 4,903.55 4,833.20 -5.079.61 -2,712.80 5,960.566.33 1466.503.08 0.27 8,278.78 64.36 212.87 4,944.35 4,874.00 -5,150.93 -2,759.01 5,960,495.95 1,486,45545 0.12 8,373.01 64.33 212.73 4,985.15 4,914.80 -5,222.33 -2,805.02 5,960,425.50 1,486,408.02 0.14 8,467.62 63.80 213.04 5,026.53 4,956.18 -5,293.78 -2,851.21 5,960,355.00 1,486,360.40 0.63 8,56148 63.84 212.37 5,067.94 4,997.59 -5,364.66 -2,896.73 5,960,285.06 1,486,313.47 0.64 8,654.80 63.85 21094 5.109.08 5,038.73 -5,435.96 -2,940.68 5,960,214.66 1,486,268.09 1.38 8,745.10 63.80 210.36 5,148.91 5,078.56 -5.505.67 -2.982.00 5,960,145.79 1,486,225.39 0.58 8,838.53 63.99 210.72 5,190.02 5,119.67 -5,577.93 -3.024.63 5,960,074.41 1,486,18131 0.40 8,933.22 64.26 210.10 5.231.34 5,160.99 -5,651.41 -3,067.75 5,960.001.82 1,486,136.72 0.65 9,027.93 64.29 209.87 5.272.45 5,202.10 -5,725.31 -3,110.40 5.959,928.80 1,486,092.60 022 9,122.09 64.31 209.17 5,313.29 5,242.94 -5,799.14 -3,152.20 5,959,855.83 1.486,049.32 0.67 9216.27 64.42 209.73 5,354.03 5.283.68 -5,873.08 -3,193.95 5.959,782.75 1.486,006.10 0.55 9,310.86 64.32 209.62 5,394.95 5,324.60 -5,947.18 -3,236.17 5,959.709.53 1,485,962.40 0.15 9,405.15 64.35 209.68 5,435.79 5,36544 -6,021.04 -3,278.21 5,959,636.53 1,485,918.88 0.07 9,499.24 64.28 210.11 5,476.57 5,406.22 -6,094.55 -3,320.48 5,959,563.89 1,485,875.15 0.42 9,593.15 64.26 210.36 5,517.34 5,446.99 -6.167.64 -3,36307 5,959.491.68 1,485,831.09 0.24 9,687.54 64.28 210.98 5,558.31 5,487.96 -6,240.78 -3.406.45 5,959,41944 1,485,786.26 0.59 9,781.78 64.32 210.80 5,599.18 5,528.83 -6,313.65 -3,450.04 5.959,347.46 1,485,741.21 0.18 9,874.11 64.32 210.68 5,639.19 5,568.84 .6,385.17 -3,492.58 5,959,276.82 1,485,697.25 0.12 9,970.58 64.26 210.73 5,681.04 5,610.69 -6,459.90 -3,536.96 5,959.203.00 1,485,651.38 0.08 10,065.18 64.31 210.72 5,722.09 5,651.74 -6.533.17 -3,580.51 5,959,130.63 1,485,60637 0.05 10,159.14 64.29 210.92 5,762.84 5,692.49 -6,605.88 -3,623.88 5,959,058.81 1,485,561.54 0.49 10252.55 64.32 210.84 5,803.34 5,732.99 -6,678.12 -3,667.08 5,958,987,46 1,485,516.90 0.08 10,347.36 64.33 210.87 5,844.41 5,774.06 -6,751.47 -3,710.91 5,958,915.01 1,485,471.61 0.03 10,441.84 64.29 210.55 5.885.37 5,815.02 -6,82467 -3.754.39 5,958,842.70 1,485,426.67 0.31 10,536.77 64.33 209.79 5.926.52 5,856.17 -6,898.63 -3,797.38 5,958,769.63 1,485,382.20 0.72 10,631.01 64.30 209.14 5,967.37 5,897.02 -6,972.57 -3,839.16 5.958,696.55 1,485,338.95 0.62 10,725.09 64.26 209.23 6,008.20 5,937.85 -7,046.57 -3,880.49 5,958,623.40 1,485,296.14 0.10 10,818.93 64.29 209.50 6,048.93 5.978.58 -7.120.25 -3,921.94 5,958,550.58 1,485,253.21 0.26 10,913.21 64.27 210.16 6,089.85 6,019.50 -7,193.94 -3,964.19 5,958,477.76 1,485.209.49 0.63 11.006.27 64.13 210.10 6,130.35 6,060.00 -7,266.40 -4,00825 5,958,406.17 1,485,165.99 0.16 11.100.40 64.22 209.13 6,171.35 6,101.00 -7,340.06 -4,048.12 5,958,333.37 1,485122.65 093 11.194.05 64.36 209.12 6,211.98 6,141.63 -7,413.77 3,089.19 5.958,260.51 1,485,080.11 0.15 11,288.36 64.29 209.96 6,252.84 6,182.49 -7,487.72 3,131.09 5,958,187.42 1,485,036.72 0.81 11,383.07 64.32 21D.83 6,293.91 6,223.56 -7,561.33 3,174.28 5,958,114.70 1,484,992.07 0.83 Vertical Section (R) Survey Tool Name 4,319.56 MWD+IFR-AK-CAZ-SC(3) 4,388.44 MWD+IFR-AK-CAZ.SC(3) 4,456.32 MWD+I1FR-AK-CAZ-SC(3) 4,52322 MWD+IFR-AK-CAZ-SC(3) 4,589.02 MWD+IFR-AK-CAZ-SC (3) 4,652.62 MWD+IFR-AK-CAZ-SC(3) 4,716.83 MWD+IFR-AK-CAZ-SC(3) 4,781.12 MWD+IFR-AK-CAZ-SC(3) 4,845.45 MWD+IFR-AK-CAZ-SC(3) 4,909.30 MWD+IFR-AK-CAZ-SC(3) 4,973.79 MWD+IFR-AK-CAZ-SC(3) 5,037.08 MWD+IFR-AK-CAZ-SC(3) 5,102.70 MWD+IFR-AK-CAZ-SC(3) 5,169.46 MWD+IFR-AK-CAZ-SC(3) 5,236.71 MWD+IFR-AK-CAZ-SC(3) 5,304.01 MWD+IFR-AK-CAZ-SC(3) 5,371.41 MWD+IFR-AK-CAZ-SC(3) 5,438.91 MWD+IFR-AK-CAZ-SC(3) 5,506.20 MWD+IFR-AK-CAZ-SC(3) 5,573.12 MWD+IFR-AK-CAZ-SC(3) 5,639.57 MWD+IFR-AK-CAZ-SC(3) 5,705.96 MWD+IFR-AK-CAZ-SC(3) 5,772.05 MWD+IFR-AK-CAZ-SC(3) 5,836.95 MWD+IFR-AK-CAZ-SC(3) 5,90478 MWD+IFR-AK-CAZ-SC(3) 5,971.28 MWD+IFR-AK-CAZ-SC(3) 6,037.24 MWD+IFR-AK-CAZ-SC(3) 6,102.77 MWD+IFR-AK-CAZ-SC(3) 6,169.31 MWD+IFR-AK-CAZ-SC(3) 6,235.75 MWD+IFR-AK-CAZ-SC (3) 6,303.00 MWD+IFR-AK-CAZ-SC(3) 6.370.41 MWD+IFR-AK-CAZ-SC(3) 6,437.94 MWD+IFR-AK-CAZ-SC(3) 6,505.13 MWD+IFR-AK-CAZ-SC (3) 6,572.22 MWD+IFR-AK-CAZ-SC (3) 6,638.12 MWD+IFR-AK-CAZ-SC(3) 6,705.24 MWD+IFR-AK-CAZ-SC(3) 6,772.51 MWD+IFR-AK-CAZ-SC(3) 6,839.91 MWD+IFR-AK-CAZ-SC(3) 6,906.60 MWD+IFR-AK-CAZ-SC(3) 8742017 12:49:28PM Page 6 COMPASS 5000.14 Build 85 Company: ConocoPhillips(Alaska) Inc. -VVNS Project: Westem North Slope She: CD5 Alpine West Pad Well: CD5-314X Wellbore: CD5-314X Design: CD5-314X Survey ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: Well CD5-314X TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) North Reference: True Survey Calculation Method: Minimum Curvature Database: OAKEDMP2 Map Map MD Inc Azi TVD TVDSS +N/S +PJ -W Northing Easting DLS (usft) V) V) (usft) (usft) (usft) (usft) (ft) (ft) (`/100') 11,475.39 64.26 210.85 6,333.96 6,263.61 -7,632.75 4,216.92 5,958,044.16 1,484,948.01 0.07 11,570.03 64.22 211.14 6,375.09 6,304.74 -7,705.81 -4,260.81 5,957.972.00 1,484.902.66 0.28 11,663.84 64.23 211.29 6,415.88 6,345.53 -7,778.06 -4.304.59 5.957,900.65 1,484,857.43 0.14 11,758.22 64.26 210.96 6,456.89 6,386.54 -7,850.83 -4,348.53 5,957,828.79 1,484,81204 0.32 11,852.63 64.33 210.42 6,497.94 6,42749 -7.923.98 -4,391.95 5,957,756.53 1,484,767,16 0.52 11.94709 64,16 209.88 6,538.89 6,468.54 -7,997.55 4,434.68 5,957,683.64 1,484,722.97 0.55 12,040.41 64.33 210.14 6,579.44 6,509.09 -8,070.33 4,476.72 5,957,611.93 1,464,679.47 0.31 12,134.74 64.26 210.77 6,620.35 6,550.00 -8,143.60 4,519.80 5,957,539.55 1,484,634.93 061 12229.70 64.29 210.79 6,661.57 6,591.22 -8,217.09 4,563.57 5,957,466.95 1,484,589.69 0.04 12,323.24 64.19 210.88 6,702.22 6.631.87 -8,289.43 -4,606.75 5,957,39550 1,484,545.06 0.14 12,416.60 64.23 211.24 6,742.93 6,672.58 -8,361.59 -4.650.22 5.957.324.24 1.484.500.16 0.35 12,511.15 64.26 211.54 6,783.92 6,713.57 -8,434.13 -4,694.48 5,957,252.61 1,484,454.45 0.29 12,605.49 64.27 211.21 6.824.89 6,754.54 -8.506.69 -4,738.72 5.957,180.96 1,484,408.76 0.32 12,700.22 64.32 210.90 6,865.98 6,79563 -8,579.81 -4,782.76 5,957108.75 1.484,363 27 0.30 12,793.91 64.32 210.48 6,906.58 6,836.23 -8,652.42 -4,825,85 5,957,037.02 1,484.318.72 0.40 12,888.17 6473 208.67 6,947.12 6,876.77 -8,726.43 -4,867.85 5,956,963.88 1,484,275.25 1.79 12,982.12 65.52 206.17 6,986.65 6,916.30 -8,802.08 4,907.09 5,956,88904 1,484,234.50 2.56 13,076.48 66.59 203.51 7,024.95 6,954.60 -8,880.33 4,943.30 5,956,811.54 1,484,196.72 2.81 1317109 67,34 201.05 7,061.97 6,991.62 -8,960.89 4,976.30 5,956,731.67 1,484,162.10 2.52 13,265.81 67.88 198.01 7,098.06 7.027.71 -9,04342 -5,005.57 5,958649.75 1,484.131.18 3.02 13,35966 68.99 193.80 7,132,57 7,062.22 -9,127.34 -5,029.47 5,956,566.33 1.484,10560 4.34 13,454,25 70.16 189.45 7,165.59 7.095.24 -9,214.14 -5,047.32 5,956,479.92 1,484,086.01 448 13,548.16 72.00 185.44 7,196.05 7,125.70 -9,302.20 -5,058.81 5,956,392.11 1,484,072.75 4.49 13,641.40 73.38 182.54 7,223.80 7,153.45 -9,390.99 -5,064.99 5.956,303.47 1.484,064.79 3.32 13,736.10 74.72 180.02 7,249.83 7,179.48 -9,482.01 -5,06]02 5,956,212.51 1,484,060.93 2.92 13,830.53 75.60 17604 7,274.01 7.203.66 -9,573.27 -5,065.47 5,956,121.25 1,484,060.64 2.23 13,924.81 76.47 176.59 7,296.77 7,226.42 4664.66 -5,061.18 5,956,029.80 1,484,06309 1.75 14,019.17 7789 176.15 7,317.70 7,247.35 -9,756.48 -5,05536 5,955,937.88 1,484,067.06 1,57 14,113.60 79.27 175,77 7,336.40 7,266.05 -9,848.81 -5,048.83 5,955,845.45 1,484,071.73 1.51 14,208.14 81.60 175.26 7,352.11 7,281,76 -9,941,74 -5,041,54 5,955,752,40 1,484,077.14 2.52 14,303.03 82.90 175.78 7,364.90 7,294.55 -10,035.48 -5,034.20 5,955.658.54 1,484,082.60 1.47 14,397.37 84.61 173.99 7,375.17 7,304.82 -10,128.88 -5,025.84 5,955,565.00 1,484,089.08 2.62 14,491.55 85.71 173.95 7,383.11 7,312.76 -10,222.20 -5,015.98 5,955,471.50 1,484,097.06 1.17 14,586.25 86.08 173.94 7,389.89 7,319.54 -10,316.13 -5,006.02 5,955,377.40 1,464,105.13 0.39 14,680.51 85.95 174.17 7,396,44 7.326.09 -10,409.66 -4,996.28 5,955,283.70 1,484,112.98 0.28 14,774.84 86.28 175.27 7,402.83 7,332.48 -10,503.37 -4,98762 5,955,189.84 1.484,119.75 1.21 14,869.96 86.13 174.71 7,409.13 7.338.78 -10,597.92 -4,979.33 5.955,095.15 1,484,126.14 0.61 14,923.09 86.75 175.34 7,412.43 7,342.08 -10,650.74 -4,974.73 5,955,042.25 1,484,129.67 1.66 14976.00 90.12 177.95 7,413.87 7.343.52 -10,703.53 -4,971.64 5,954,989.41 1,484,131.70 8.06 Vertical Section (ft) Survey Tool Name 6,971.59 MWD+IFR-AK-CAZ-SC(3) 7.037.83 MWD+IFR-AK-CAZ-SC(3) 7.103.28 MWD+IFR-AK-CAZ-SC(3) 7,169.23 MWD+IFR-AK-CAZ-SC(3) 7,235.62 MWD+IFR-AK-CAZ-SC(3) 7,302.53 MWD+IFR-AK-CAZ-SC(3) 7,368.75 MWD+IFR-AK-CAZ-SC(3) 7,435.31 MWD+IFR-AK-CAZ-SC (3) 7,502.00 MWD+IFR-AK-CAZ-SC (3) 7,567.62 MWD+IFR-AK-CAZ-SC(3) 7,633.03 MWD+IFR-AK-CAZ-SC(3) 7,698.71 MWD+IFR-AK-CAZ-SC(3) 7,764.40 MWD+IFR-AK-CAZ-SC(3) 7,830.68 MWD+IFR-AK-CAZ-SC(3) 7,896.59 MWD+IFR-AK-CAZ-SC(3) 7,964.03 MWD+IFR-AK-CAZ-SC(3) 8,033.48 MWD+IFR-AK-CAZ-SC(3) 8705.93 MWD+IFR-AK-CAZ-SC(3) 8.181.12 MWD+IFR-AK-CAZ-SC(3) 8,258.77 MWD+IFR-AK-CAZ-SC(3) 8,338.54 MWD+IFR-AK-CAZ-SC (3) 8,422.02 MWD+IFR-AK-CAZ-SC (3) 8,507.62 MWD+IFR-AK-CAZ-SC (3) 8,594.69 MWD+IFR-AK-CAZ-SC(3) 8,684.54 MWD+IFR-AK-CAZ-SC(3) 8,775.13 MWD+IFR-AK-CAZ-SC(3) 8,866.23 MWD+IFR-AK-CAZ-SC(3) 8,957.96 MWD+IFR-AK-CAZ-SC (3) 9,050.30 MWD+IFR-AK-CAZ-SC(3) 9.143.34 MWD+IFR-AK-CAZ-SC(3) 9,237.19 MWD+IFR-AK-CAZ-SC(3) 9,330.84 MWD+IFR-AK-CAZ-SC (3) 9,424.63 MWD+IFR-AK-CAZ-SC(3) 9,519.03 MWD+IFR-AK-CAZ-SC(3) 9,613.00 MWD+IFR-AK-CAZ-SC(3) 9,707.01 MWD+IFR-AK-CAZ-SC(3) 9,801.79 MWD+iFR-AK-CAZ-SC(3) 9,854.74 MWD�HFR-AK-CAZ�SC(3) 9,907.45 NAT an AI chwl --- 8/4/2017 12:49:28PM Page 6 COMPASS 5000.14 Build 85 I (, ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Coordinate Reference: Well CDS-314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N1S +E/ -W Northing Easting DLS Section (usft) V) V) (usft) (usft) (usft) (usft) (tt) (ft) (.1100') (ft) Survey Tool Name 14,996.31 91.42 178.95 7.413.60 7,343.25 -10,723.83 -4,971.09 5,954,969.11 1.484,131,84 8.06 9.927.63 MWD+IFR-AK-CAZ-SC(4) 15,091.72 89.82 174,13 7,412.57 7,342.22 -10,819.03 -0,965.33 5,954,87382 1.484,135 68 5.32 10,022.70 MWD+IFR-AK-CAZ-SC(4) 15,187.23 89.63 169.97 7,413.02 7,342.67 -10,913.60 -4,952.12 5,954,779.01 1,484,146.98 4.36 10,118.19 MWD+IFR-AK-CAZ-SC(4) 15,283.10 89.28 16709 7.413.94 7,343.59 -11,007.54 -4,933.06 5,954,684.71 1,484.164.15 3.03 10,213.87 MWD+IFR-AK-CA7-SC(4) 15.377.17 89.43 163.73 7.415.00 7,344.65 -11,098,56 -4,909.37 5,954,593.24 1,484,18600 3.58 10,307.30 MWD+IFR-AK-CAZ-SC(4) 15,472.80 89.39 163.43 7.415.98 7,345.63 -11,190.28 -4,882.34 5,954,501.00 1,484,211.18 0.32 10,401.89 MWD+IFR-AK-CAZ-SC(4) 15,568.79 89,15 162.87 7,417.20 7,346.85 -11,282.15 -4,854.52 5,954,408,60 1484,237.15 0.63 10,496.73 MWD+IFR-AK-CAZ-SC(4) 15,664.30 89.68 167.20 7,418.18 7.347.83 -11,374.39 4,829.86 5,954,315.89 1,484,259.94 4.57 10,591.51 MWD+IFR-AK-CAZ-SC(4) 15,759.91 89.42 169.32 7,418.93 7,348.58 -11,467.99 -4,810.41 5,954,221.92 1,484,277.50 2.23 10,686.91 MWD+IFR-AK-CAZ-SC(4) 15,855.22 89.56 172.53 7,419.78 7,349.43 -11,562.09 -4,795.38 5,954,127.54 1,484,290.63 3.37 10,782.18 MWD+IFR-AK-CAZ-SC(4) 15,950.39 89.64 17453 7,420.44 7,350.09 A1,656.65 -4,784.66 5.954,03280 1,484,299.45 2.10 10,877.31 MWD+IFR-AK-CAZ-SC(4) 16,044.40 89.21 17777 7.421.39 7,351.04 -11,750.43 4,778.34 5,953,938.92 1,484,303.87 3.48 10,971.06 MWD+IFR-AK-CAZ-SC(4) 16,139.88 89.41 180.71 7,422.54 7.352.19 -11,845.88 -4,77708 5,953,84346 1,484,303.22 3.09 11,065.76 MWD+IFR-AK-CAZ-SC(4) 16,235.16 89.19 177.48 7,423.70 7,353.35 -11,941.13 -4,775,57 5,953,748.21 1,484,302,81 3.40 11.160.29 MWD+IFR-AK-CAZ-SC(4) 16,329.78 89.39 180.01 7,424.87 7,354,52 -12,035.71 -4,773.50 5.953,653.61 1,484,302,98 268 11,254.24 MWD+IFR-AK-CAZ-SC(4) 16.425.63 90.23 181.34 7,425.19 7.354.84 -12,131.55 -4,774.63 5,953,557,82 1,484,299.92 1,64 11,348.99 MWD+IFR-AK-CAZ-SC(4) 16,520.37 89.87 181.09 7,425.11 7,354.76 -12,226,27 -4,776.64 5,953,463,17 1.484.296.00 946 11,442.51 MWD+IFR-AK-CAZ-SC (4) 16,616.42 89.78 180.14 7,425.40 7.355.05 -12,322.31 -4,777.67 5,953,367.17 1,484,293.04 099 11.537.47 MWD+IFR-AK-CAZ-SC(4) 16,711.43 88.78 177.10 7,426.60 7.356.25 -12,417.28 -4,775.38 5,953272.19 1,484,293.42 3.37 11,631.83 MWD+IFR-AK-CAZ-SC(4) 16,806.23 90.13 172.00 7,427.50 7,357.15 -12,511.61 -4,766.38 5,953,177.70 1,484,300.52 5.56 11.726,50 MWD+IFR-AK-CAZ-SC(4) 16,901.54 90.40 169.33 7,427.06 7,356.71 -12,605.65 4,750.92 5,953,083.38 1,484.314.08 2.82 11,821.77 MWD+IFR-AK-CAZ-SC (4) 16,996.91 89.09 165.07 7,427.48 7,357.13 -12,69862 4,729.80 5,952.990.00 1,484.333.32 4.67 11.916.78 MWD+IFR-AK-CAZ-SC(4) 17,091.59 89.41 160.93 7,428.72 7,358.37 -12.789.14 -4,702.13 5,952,898.96 1,484,359.17 4.39 12,010.27 MWD+IFR-AK-CAZ-SC(4) 17,186.81 88.44 160.14 7.430.51 7,360.16 -12,878.90 -4,670+40 5,952,808.58 1,484,389,08 1.31 12,103.57 MWD+IFR-AK-CAZ-SC(4) 17,281.64 8925 161.55 7,432.42 7,362,07 -12.968.46 -4,639.29 5,952,718.42 1,484,418.38 1.71 12,196.59 MWD+IFR-AK-CAZ-SC(4) 17,377.32 87.88 162.49 7,434.82 7.364.47 -13,05943 -4,609.77 5,952,626,88 1,484.446.06 174 12,290.78 MWD+IFR-AK-CAZ-SC(4) 17,471,33 86.50 167.00 7,439.43 7.369.08 -13,150,00 -4,585.07 5,952,535.84 1,484,468.93 5.01 12,383.90 MWD+IFR-AK-CAZ-SC(4) 17,566.83 91.98 171 09 7.440.69 7,370.34 -13,243,69 -4,566.94 5,952,441.81 1,484,485.18 7.16 12,479.21 MWD+IFR-AK-CAZ-SC (4) 17,662.30 90.94 172.63 7,438.26 7,367.91 -13,338.17 -4,553,42 5,952,347.09 1,464,496.78 1.95 12,574,65 MWD+IFR-AK-CAZ-SC(4) 17,756.16 89.68 174.28 7,437.75 7,367.40 -13,431.41 -4,542.72 5,952,253.66 1,484.505.60 2.21 12,668.47 MWD+IFR-AK-CAZ-SC(4) 17,855.40 89.24 173.14 7,438.69 7,368.34 -13,530.04 -4,531.85 5,952,154.83 1,484,514.49 1.23 12,767.66 MWD+IFR-AK-CAZ-SC(5) 17,953.11 90.16 171.49 7,439.20 7,368.85 -13,626.87 -4,518.79 5,952,057.77 1,484,525.60 1.93 12.865.36 MWD+IFR-AK-CAZ-SC(5) 18,048.52 9941 169.43 7,438.73 7,368.38 -13,72096 -4,502.98 5,951,963.39 1.484,539,52 2.17 12,960.73 MWD+IFR-AK-CAZ-SC(5) 18,143,27 89.62 165.86 7,438.70 7,368.35 -13,813,50 -4,48271 5,951,870.47 1,484,557.92 3.86 13,055.19 MWD+IFR-AK-CAZ-SC(5) 18,238.09 90.65 165.02 7,438.48 7.368.13 -13,905.27 -4,458,87 5,951,778.24 1,484,579.90 1.40 13,149.39 MWD+IFR-AK-CAZ-SC(5) 18,333.67 88.78 170.43 7,438.95 2368.60 -13,998.62 4.438.56 5,951,684.51 1,484,598.33 5.99 13,244.66 MWD+IFR-AK-CAZ-SC(5) 18.428.89 89,27 175,25 7,440.57 7,370,22 -14,093.06 -4,426.69 5,951,589.86 1,484,608.29 5.09 13,339.83 MWD+IFR-AK-CAZ-SC(5) 18,524.01 89,26 176.88 2441,79 7,371.44 -14,187.94 4420.17 5,951,494.87 1,464,612.90 1.71 13,434.70 MWD+IFR-AK-CAZ-SC(5) 18,619.75 89.42 178.93 7,442.90 7,372.55 -14,283,61 4416.67 5,951,399.16 1,484,614.48 2.15 13,529.92 MWD+IFR-AK-CAZ-SC(5) 18,715.81 90.52 180.26 7,442.95 7,372.60 -14,379.66 -4,415.99 5,951,303,12 1,484,613.22 1,80 13,625.13 MWD+IFR-AK-CAZ-SC(5) 8141201712:49:28PM Page 7 COMPASS 5000.14 Build 86 ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well CD5-314X Project: Western North Slope TVD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CDS-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CDS-314X Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (1) lush) (usft) (usft) (usft) (ft) (ft) (°/100-) (ft) Surrey Tool Name 18,810.67 90.27 187.23 7,442.29 7,371.94 -14,474.26 -4.422.18 5,951,208.67 1,484,605.13 7.35 13,717.95 MWD+IFR-AK-CAZ-SC (5) 18,905.74 90.86 180.61 7,441.35 7,371.00 -14,58905 -4,428.68 5,951,114.04 1,484,596.73 6.99 13,810.91 MW1)+1FR-AK-CAZ-SC(5) 19,000.03 90,33 174.78 7,440.37 7,370.02 -14,663.22 4,424.89 5,951,019.82 1,484,598.62 6.21 13,904.69 MWD+IFR-AK-CAZ-SC(5) 19.095.60 89.56 173.67 7,440.47 7,370.12 -14,758.30 -4.415.27 5,950,924.57 1,484,606.32 1.41 14,000.18 MWD+IFR-AK-CAZ-SC(5) 19,190.23 89.56 175.03 7,441.19 2370.84 -14,852.46 -4.405.95 5,950,830.24 1,484,613.74 1.44 14,094.73 MWD+IFR-AK-CAZ-SC (5) 19.285.14 88.05 174.26 7,443.17 7.372.82 -14,948.94 -4.397.10 5,950.735.62 1,484,620.69 1.79 14,189.52 MWD+IFR-AK-CAZ-SC (5) 19,382.08 90.08 172.98 7,444.75 7,374.40 -15,043.26 4,386.33 5,950,639.11 1,484.629.52 2.48 14,286.40 MWD+1FR-AK-CAZ-SC(5) 19,476.28 89.98 173.18 2444]0 7,374.35 -15,136.77 4.374.98 5,950,545.39 1,464,638.99 0.24 14.380.58 MWD+IFR-AK-CAZ-SC(5) 19,571.88 90.21 171 As 7,444.55 7,374.20 .15,231.53 -4.362.39 5,950,450.40 1,484,649.66 1.58 14,476.17 MWD+IFR-AK-CAZ-SC(5) 19,666.57 89.94 169.61 7,444.42 7,374.07 -15,324.96 -4,347,01 5,950,356.69 1,484,663.16 2.22 14,570.83 MWD+IFR-AK-CAZ-SC(5) 19,761.81 90.13 16649 7,444.36 7,37401 -15,418.13 4,327.29 5,950,263.16 1,484,681.00 3.28 14,665.83 MWD+IFR-AK-CAZ-SC (5) 19,857.20 90.02 168.03 7,444.24 7,373.89 -15,511.16 4,306.26 5,950,169.72 1,484,700.16 1.62 14,760.90 MWD+1FR-AK-CAZ-SC(5) 19,952.98 89.81 175.05 7,444.38 7,374.03 -15.605.84 -4,292.17 5,950,074.78 1,484,712.33 7.33 14,856.61 MWD+IFR-AK-CAZ-SC(5) 20,048.10 89.79 176.35 7,444.71 7,374.36 -15,70069 -4,285.04 5,949,979.62 1,484,717,55 1.37 14,951.53 MWD+IFR-AK-CAZ-SC(5) 20,143.12 89.15 173.73 7,445.59 7,375.24 -15,79534 4,276.83 5,949,885.03 1,484,723.86 2.84 15,046.40 MWD+IFR-AK-CAZ-SC(5) 20,239.76 69.09 168.20 7,447.08 7,376.73 -15,89036 4,261.66 5,949,789,34 1,484,737.10 5.72 15,143.00 MWD+IFR-AK-CAZ-SC (5) 203500 89.31 165.66 7,448.41 7,378.06 -15,983.49 4,240.13 5,949,696,19 1,464,756.76 2.68 15.237.83 MWD+IFR-AK-CAZ-SC(5) 20,430.11 89.01 166.34 7,449.80 7,379.45 -16,075.77 4.217.12 5,949,603.48 1,484,777.90 0.78 15,332.41 MWD+IFR-AK-CAZ-SC(5) 20,525.30 89.68 171.44 7,450.89 7,380.54 -16,169.13 -4.198.79 5,949,509.77 1,484,794.36 5.40 15,427.42 MWD+IFR-AK-CAZ-SC(5) 20,620.15 89.71 177,30 7,451.40 7,381,05 -16,26348 -4,189.49 5,949,41526 1,484,801.76 6.18 15,522.15 MWD+IFR-AK-CAZ-SC(5) 20,716.18 89.49 181.24 7,452.07 7,381.72 -16,35949 -4,168.26 5,949,319.26 1,484,801.05 4.11 15,617.38 MWD+IFR-AK-CAZ-SC(5) 20,811.09 90.05 182.27 7,452.45 7,382.10 -16,454.35 -4,191.17 5,949224.48 1,484,79623 1.24 15,710.92 MWD+IFR-AK-CAZ-SC(5) 20,906.35 90,57 184.74 7.451.93 7,381.58 -16,549.42 -4,196.99 5.949,129.55 1,484,788.50 2.65 15,804.26 MWD+IFR-AK-CAZ-SC(5) 21,001.13 91.38 182.63 7,450.32 7,379.97 -16,64399 4,203.08 5,949,035.14 1,484,780.51 2.38 15,897.05 MWD+IFR-AK-CAZ-SC(5) 21,095.62 90.40 18251 7,448.85 7,378.50 -16,738.37 -4,207.32 5,948.940.86 1,484,774.37 1.04 15,989.93 MWD+IFR-AK-CAZ-SC(5) 21,190.81 89.07 184.08 7,449.29 7,378.94 -16,833.39 -4,212.79 5,948,845.97 1.484,76699 2.16 16,083.27 MWD+IFR-AK-CAZ-SC(5) 21285.51 89.99 179.77 7,450.07 7,379.72 -16,928.01 -4,215.97 5,948,751.44 1,484,761.91 4.65 16,176.52 MWD+IFR-AK-CAZ-SC(5) 21,380.19 87,50 178.53 7,452.14 7,381.79 -17,022.65 -4.214.57 5,948,656.80 1,484,761.41 294 16,270.43 MWD+IFR-AK-CAZ-SC(6) 21,474,40 88.22 17721 7,455.66 7,385,31 -17,116.73 -4,211,07 5,948,662.68 1,484,763.01 1.60 16.364.08 MWD+IFR-AK-CAZ-SC(6) 21,569.21 88.87 174,78 7,458.07 7,387.72 -17,211.27 4,204.45 5.948,468.04 1,484,767.73 2.65 16,458.62 MWD+IFR-AK-CAZ-SC (6) 21,665.25 89.55 173.02 7,459.39 7,389.04 -17,306.75 -4,194.24 5,948,372.37 1,484,776.01 1.96 16,554.60 MWD+IFR-AK-CAZ-SC (6) 21,759.61 89.93 171.61 7,459.82 7.389.47 -17,400.46 -4,181.60 5,948,278.44 1,484,786.76 154 16,649.15 MWD+IFR-AK-CAZ-SC (6) 21,855.14 89.62 170.53 7,460.20 7,389.85 -17,494.63 4,166.80 5,948,183.99 1,480,799.66 1.16 16,744.47 MWD+1FR-AK-CAZ-SC(6) 21,950.48 89.52 169.64 7,460,91 7,390.56 -17,588.54 4,150.38 5,948,089.78 1,484,814.18 0.94 16,839.75 MWD+1FR-AK-CAZ-SC(6) 22,046.23 89.55 169.38 7,461.69 7,391.34 -17,682.69 -4,132.95 5,947.995.31 1,484.829.71 0.27 16,935.41 MWD+IFR-AK-CAZ-SC (6) 22,141.47 90.15 172,53 7,461.94 7,391.59 -17,776.73 4,11298 5,947,900.99 1.484,842.79 3.37 17,030.62 MWD+IFR-AK-CAZ-SC (6) 22,236.11 90.03 172.05 7.461.79 7.391.44 -17,870.52 -4,105.29 5,947,806.97 1,484,853.59 0.52 17,125.26 MWD+IFR-AK-CAZ-SC(6) 22,331.54 89.31 170.61 7,462.34 7,391.99 -17,964.85 4,090,90 5,947,712.38 1,484,866.08 1.69 17,220.68 MWD+IFR-AK-CAZ-SC(6) 22,426.68 89.11 168.63 7,463,65 7,393.30 -18,058.42 4,073.76 5,947,618.49 1,484,881.33 2.09 17,315.72 MWD+1FR-AK-CAZ-SC(6) 22,522.18 88.66 165.00 7,465.51 7,395.16 -18,151.37 -4,051.99 5,947,525.13 1,484,901.23 3.83 17,410.80 MWD+IFR-AK-CAZ-SC (6) 8/42017 12:49:28PM Page 8 COMPASS 5000.14 Build 65 ConocoPhillips Definitive Survey Report Company: Con=Phillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well CD5-314X Project: Western North Slope TVD Reference: C05 -314X: 33.8+36.55 @ 70.35usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) Well: CD5-314X North Reference: True Wellbore: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5-314X Database: OAKEDMP2 Survey 81412017 12:49:28PM Page 9 COMPASS 500014 Build 85 Map Map Vertical MD Inc AN TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 22,617.56 89.01 164.82 7,467.45 7,397.10 -18,243.44 -4,027.16 5,947,432.58 1,484,924.19 0.41 17,505.43 MWD+IFR-AK-CAZ-SC (6) 22,712.47 88.73 165.04 7.469.32 7,398.97 -18,335.07 -4.002.49 5.947,340.48 1.484.947.01 0.38 17,599.60 MWD+IFR-AK-CAZ-SC(6) 22,808.73 89.00 165.37 7.471.23 7,400.88 -18,428.12 -3,977.91 5,947,24696 1,484,969.71 0.44 17,695.16 MWD+IFR-AK-CAZ-SC(6) 22,903.93 89.97 169.63 7,472.08 7.401.73 -18,521.04 -3,957.31 5,947,153.66 1.484.988.43 459 17,790.04 MWD+IFR-AK-CAZ-SC(6) 22,998.49 89.68 173.99 7,472.37 7.402.02 -18,614.61 -3.94385 5,947,059.84 1.485.000.01 4.62 17,884.58 MWD+IFR-AK-CAZ-SC(6) 23.094.67 87.61 174.73 7.474.65 2404.30 -18,710.29 -3.934.40 5,946.963.99 1,485,007.54 2.29 17,980.64 MWD+IFR-AK-CAZ-SC(6) 23.189.86 91.06 174.83 7,475.75 7,405.40 -18,805.07 -3,925.74 5.946.869.07 1,485,014.29 3.63 18,075.70 MWD+IFR-AK-CAZ-SC(6) 23,264.55 91.20 174.24 7,473.89 7.403.54 -18,899.31 -3,916.72 5.946,774.67 1.485,021.40 0.64 18,170.28 MWD+IFR-AK-CAZ-SC(6) 23,360.59 90.75 173.01 7,472.25 7.401.90 -18,994.74 -3,90606 5,946,679.06 1,485,030.14 1.36 18.266.26 MWD+IFR-AK-CAZ-SC(6) 23.475.19 90.65 171.62 7,471.10 7,400.75 -19,088.48 -3,893.41 5.946.585.09 1,485,040.90 1.47 18,360.85 MWD+IFR-AK-CAZ-SC (6) 23.570.80 89.16 165.58 7,471.25 7,400.90 -19.182.16 -3,874.52 5,946.491.06 1,85,057.90 6.51 18,456.25 MWD+IFR-AK-CAZ-SC(6) 23,665.22 89.94 162.32 7,472.00 7,401.65 -19272.88 -3.848.42 5,946,39983 1,485,082.17 3.55 18,549.72 MWD+IFR-AK-CAZ-SC(6) 23,761.24 89.59 160.56 7,472.39 7,402.04 -19,363.90 -3,817.86 5,946,308.22 1,485,110.89 1.87 18,644.11 MWD+IFR-AK-CAZ-SC(6) 23,856.70 89.25 158.89 7.473.36 7.403.01 -19,453.44 -3,784.78 5,946.218.04 1.485,142.15 1.79 18,737.38 MWD+IFR-AK-CAZ-SC(6) 23,951.78 89.18 159.40 7.474.66 7,404.31 -19,542.28 -3,750.94 5.946,128.54 1,485,174.20 0.54 18.830.07 MWD+IFR-AK-CAZ-SC (6) 24.046.65 88.82 161.04 7,476.31 7,405.96 -19,631.54 -3,718.84 5,946,038.67 1,485.204.50 1.77 18,922.92 MWD+IFR-AK-CAZ-SC(6) 24,140.98 90.39 164.60 7,476.96 7.406.61 -19,721.64 -3,690.98 5.945,948.03 1,485,230.53 4.12 19,016.02 MWD+IFR-AK-CAZ-SC(6) 24,237.65 90.34 166.47 7,476.35 7,406.00 -19,815.24 -3,666.84 5,945,853.97 1.485.252.79 1.94 19,112.07 MWD+IFR-AK-CAZ-SC(6) 24,333.20 89.97 166.44 7,476.09 7,405.74 -19,908.13 -3,644.46 5,945,760.65 1,485.273.29 0.39 19,207.18 MWD+IFR-AK-CAZ-SC(6) 24.428.50 90.45 168.78 7.475.74 7,405.39 -20,00120 -3,624.01 5.945,667.19 1,485,291.86 2.51 19,302.19 MWD+IFR-AK-CAZ-SC(6) 24,523.55 89.47 173.65 7,475.81 7,40546 -20.095.11 -3,609.50 5,945.573.02 1,485,304.48 5.23 19,397.20 MWD+IFR-AK-CAZ-SC(6) 24,618.66 89.73 178.65 7,476.47 7,406.12 -20,189.97 -3.603.12 5,945,476.06 1.485,308.95 5.26 19,492.03 MWD+IFR-AK-CAZ-SC Is) 24,71384 90.06 181.80 7.476.65 7,406.30 -20,285.14 -3,603.49 5,945,382.92 1,485,306.66 3.33 19,586.22 MWD+IFR-AK-CAZ-SC(6) 24,809.61 89.09 180.41 7.477.36 7.407.01 -20.380.88 -3,605.34 5,945,287.24 1,485,302.89 1.77 19.680.77 MWD+IFR-AK-CAZ-SC(6) 24,904.73 90.67 179.42 7,477.56 7,407.21 -20,476.00 -3.605.20 5,945,192.15 1.485,301.12 1.96 19,774.98 MWD+IFR-AK-CAZ-SC(6) 25,000.07 89.66 177.81 7,477.28 7,406.93 -20,571.31 -3.602.89 5,945,096.82 1,485.301.50 1.99 19,869.68 MWD+IFR-AK-CAZ-SC (6) 25.095.49 91.65 173.75 7,476.19 7.405.84 -20,666.44 -3,59587 5,945,001.58 1,485.306.60 4.74 19,964.87 MWD+IFR-AK-CAZ-SC(6) 25,191.21 89.68 170.24 7,475.08 7,404.73 -20,761.20 -3,58255 5,944,906.57 1,485,318.02 4.20 20,060.56 MWD+IFR-AK-CAZSC(6) 25,28578 88.62 164.26 7,476.48 7,406.13 -20.853.38 -3,561.69 5.944.813.99 1,485,337.02 6.42 20,154.75 MWD+IFR-AK-CAZ-SC(6) 25,380.91 89.24 160.24 7,478.26 7,407.91 -20,94395 -3,532.70 5.944,722.87 1,485,364.18 4.28 20.248.47 MWD+IFR-AK-CAZ-SC(6) 25,476.12 89.14 164.17 7,479.61 7,409.26 -21,034.58 -3,503.61 5,944,631.68 1,485,391.44 4.13 20.342.26 MWD+IFR-AK-CAZ-SC(6) 25,571.30 89.21 172.33 7.480.98 7,410.63 -21,127.68 -3,484.24 5,944,538.22 1,485.408.92 8.57 20,437.15 MWD+IFR-AK-CAZ-SC(6) 25,667.94 8949 177.50 7,482.08 7.411.73 -21,223.90 -3,475.68 5,944,441.85 1,485,415.54 5.36 20.533.63 MWD+IFR-AK-CAZ-SC(6) 25.762.32 90.54 183.31 7,482.05 7.411.70 -21,318.23 -3.476.35 5,944,347.56 1,485,412.98 6.26 20,626.95 MWD+IFR-AK-CAZ-SC(6) 25,857.50 89.69 176.67 7.481.86 7,411.51 -21.413.36 -3,476.33 5,944.252.46 1,485,411.08 7.03 20,721.15 MWD+IFR-AK-CAZ-SC(6) 25,953.72 89.67 169.47 7,482.40 7,412.05 -21,508.81 -3,464.73 5,944.156.80 1,485,420.76 7.48 20,817.29 MWD+IFR-AK-CAZ-SC(6) 26,048.31 87.91 16373 7,484.40 7,414.05 -21,600.76 -3,442.83 5,944.064.43 1,485,44081 6.35 20,911.40 MWD+IFR-AK-CAZ-SC(6) 26,143.27 89.98 171.91 7,486.15 7,415.80 -21.693.49 -3,422.81 5,943,971.33 1,485,456.95 8.88 21,006.00 MWD+IFR-AK-CAZ-SC(6) 26,239.12 89.21 175.58 7,486.83 7.416.48 -21,788.75 -3,412.37 5,943,875.89 1,485,467.47 3.91 21,101.79 MWD+IFR-AK-CAZ-SC(6) 26,333.94 89.43 172.37 7,487.95 7.417.60 -21,88302 -3.402.42 5.943,781.43 1,485,475.52 339 21,196.53 MW13+IFR-AK-CAZ-SC(6) 81412017 12:49:28PM Page 9 COMPASS 500014 Build 85 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-314X Wellbore: CD5-314X Design: CD5-314X Survey MD Inc (usft) (°) 26,429.61 Wes 26,525.67 89.49 26,621.83 89.59 26,716.50 89.13 26,812.02 89.57 26,907.58 89.28 26.950.13 89.57 27,000.00 89.57 4-112"x 63W' 27,01000 89.57 ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Azi TVD TVDSS +N/ -S +E/ -W (") (usft) (usft) (usft) (usft) 175.22 7,488.69 7,418.34 -21,978.12 -3,392.08 179.26 7,489.37 7,419.02 -22,074.05 -3,387.46 178.29 7,490.15 7.419.80 -22,170.18 -3.38640 174.98 7,491.20 7,420.85 -22,264.67 -3,379.85 170.16 7,492.29 7,421.94 -22,359.35 -3,367.50 170.33 7,493.25 7,422.90 -22,453.53 -3,351.31 172.03 7,493.67 7,423.32 -22,495.57 -3,344.79 172.03 7,494.05 7.423.70 -22,544.96 -3,337.87 172.03 7,494.12 7.423.77 -22,55486 -3,336.48 Well CD5-314X C05 -314X: 33.8+36.55 @ 70.35usft (Doyon 19) CD5-314X: 33.8+36.55 @ 70.35usft (Doyon 19) True Minimum Curvature OAKEDMP2 Map Map Surface Coordinates Vertical Declination & Convergence Northing Easting DLS Section (ft) (ft) (°1700') (ft) Survey Tool Name 5,943,686.16 7.486483.94 299 21,292.14 MWD+IFR-AK-CAZ-SC(6) 5,943,590.16 L485,48684 4.21 21,387.78 MWD+IFR-AK-CAZ-SC(6) 5,943,494.01 1,485,486.76 1.01 21,483.27 MWD+IFR-AK-CAZ-SC(6) 5,943,399.44 1,485,49041 3.53 21.577.61 MWD+IFR-AK-CAZ-SC(6) 5,943,304.54 1,485,500.85 5.07 21.67399 MWD+IFR-AK-CAZ-SC(6) 5,943,210.06 1,485,515.14 0.35 21,768.60 MWD+IFR-AK-CAZ-SC(6) 5,943,167.90 1,485,520.81 4.05 21,811.14 MWD+IFR-AK-CAZ-SC(6) 5,943,118.39 1,485,526.73 0.00 21.861 01 N0T an Actual Survey 5,943,108.46 1,485,527.92 0.00 21,87101 PROJECTED10 TD Final Definitive Survey Verified and Signed -off All targets and/or well posltlon objectives have been achieved. Yes ❑ No 1 have checked to the best of my ability that the following data is correct: Surface Coordinates [] Declination & Convergence GRS Survey Corrections Survey Tool Codes Dilnlb's9 bed by Na Man Brandon Temple Tmft,7.00.W SLB DE: agialNsgred by Willem William Earhart-hon Client Representative. 14140 Gaoo Date: 8l71P017 8/412017 12:49:28PM Page 10 COMPASS 5000.14 Build 85 Loepp, Victoria T (DOA) From: NSK Well Integrity Supv CPF3 and WNS <n2549@conocophillips.com> Sent: Tuesday, August 08, 2017 7:02 AM To: Loepp, Victoria T (DOA) Cc: Senden, R. Tyler Subject: CD5-314X (PTD 217-021) Flowing Water in Conductor Report Follow Up Flag: Follow up Flag Status: Flagged Victoria, Operations reported that CRU CD5-314X (PTD 217-021) has flowing water through the surface casing by conductor annulus. CPAI suspects this water to be from the same shallow source water encountered in the original CDS-314 (PTD 215-039) and CDS-313 (PTD 215-084). We will take initial samples for analysis and collect water at the wellhead to monitor the flow volume. Please let me know if you have any questions or disagree with this plan. Regards, Rachel Kautz/Travis Smith Well Integrity Supervisor, ConocoPhillips Alaska Inc. Office: 907-659-7126 Cell: 907-943-0450 Loepp, Victoria T (DOA) From: Earhart, Will C <William.C.Earhart@conocophillips.com> Sent: Friday, June 30, 2017 3:37 PM To: Loepp, Victoria T (DOA) Subject: CD5-314X Update Follow Up Flag: Follow up Flag Status: Flagged Victoria, To update, we were able to get the 7-5/8" casing to TD. We anticipate following the approved APD with no need for any sundries. Thank you for your assistance with planning our P&A contingency. Have a good weekend, Will Will Earhart Drilling Engineer- ConocoPhillips Alaska, Inc William.C. Earhart(a)conocoohillios.com ATO -1706 Office: +1.907.265.1077 Mobile: +1.540.448.1789 Loepp, Victoria T (DOA) From: Loepp, Victoria T (DOA) Sent: Thursday, June 29, 2017 8:54 AM To: Earhart, Will C Subject: RE: CD5-314X Plugback Proposed Plan (PTD 217-021) Follow Up Flag: Follow up Flag Status: Completed In step 4, a tag will not be necessary if the plug bumps. Otherwise, a tag will be required. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loeoora)alaska gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(sl. It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria. Loeoo@alaska aov From: Earhart, Will C [mailto:William.C.Earhart@conocophillips.com] Sent: Wednesday, June 28, 2017 11:43 AM To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> Subject: CD5-314X Plugback Proposed Plan (PTD 217-021) Victoria, As discussed earlier, we may not be able to get our 7-5/8" casing to TD on CD5-314X (PTD 217-021) but are currently washing down with full returns. In the event we are unable to get down, we would like to plug back the section to avoid having the unstable Kalubik shale open in our production lateral. Below is our proposed abandonment plan if we land high: 1. Circulate and condition annulus in preparation for cement job. 2. Pump cement job to secure the casing shoe using the casing shoe track and top & bottom wiper plugs a. Target 500' MD of cement in the annulus b. Shoe track is 127ft long from shoe to top of float collar will be left full of cement Note: the Kuparuk C sand is the only hydrocarbon bearing reservoir open in this intermediate section 3. WOC 4. Pressure test inside of 7-5/8" casing to 1,850 psi (0.25psift x 7400' TVD) a. We will not physically tag 5. Set CIBP inside 7-5/8" casing at "2900' MD. 6. Cut 7-5/8" casing lit above CIBP 7. Set 17.0ppg cement kick-off plug from top of CIBP to —200ft inside the surface casing shoe a. Tag cement plug with drilling BHA 8. Sidetrack off 17.Oppg cement kick-off plug and re -drill intermediate section 9.78" x 11" Given the mechanical nature of the 7-5/8" float collar and cement wiper plug system, we do not see the need to physically tag the shoe track. Please see the attached PDF for a visual of our current plan. Thanks Will Will Earhart Drilling Engineer- ConocoPhillips Alaska, Inc William. C. Earhart(a`conoconhilli s.com ATO -1706 Office: +1.907.265.1077 Mobile: +1.540.448.1789 Loepp, Victoria T (DOA) From: Alexa, Kurt J <Kurt.J.Alexa@conocophillips.com> Sent: Tuesday, June 20, 2017 12:57 PM To: Loepp, Victoria T (DOA) Subject: CD5-314X (PTD 217-021) Intermediate Casing Location Change Follow Up Flag: Follow up Flag Status: Flagged Good afternoon Victoria, As discussed on the phone, we are currently drilling the intermediate hole section of the CD5-314X (PTD 217-021) and formations have been coming in deeper (15ft TVD) than originally anticipated. This has resulted in the Kuparuk C sand (Intermediate Casing Set Point) being deeper than originally anticipated and due to the fact that we are at 87degrees will put the Intermediate Casing Set Depth greater than the 500' MD deeper/longer than was originally permitted. The TD of the intermediate casing will be at 14,986' MD / 7,410' TVD (PTD 217-021 was 14,326' MD / 7,388' TVD). My interpretation of 20 AAC 25.015 "Changes to a program in a permit to drill" says that we need to submit a new application for a Permit to Drill unless my interpretation is wrong and that it only applies to Total Depth at end of well. Please let me know if you want me to create the new application or if this letter will suffice. Thanks Kurt Alexa Staff Drilling Engineer ConocoPhillips Alaska (907) 263-4933 ( Office) (907) 787-9637 ( Cell ) THE STATE °fALASKA GOVERNOR BILL WALKER Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Colville River Field, Alpine Oil Pool, CRU CD5-314X ConocoPhillips Alaska, Inc. Permit to Drill Number: 217-021 Surface Location: 369' FNL, 2694' FEL, Sec. 18, TI 1N, R4E, UM Bottomhole Location: 1345' FNL, 1184' FEL, Sec. 1, TION, R3E, UM Dear Mr. Alvord: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Enclosed is the approved application for permit to drill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy Foerster Chair DATED this ZZ day of March, 2017. STATE OF ALASKA Al: ;A OIL AND GAS CONSERVATION COMMI ON PERMIT TO DRILL 20 AAC 95 005 IrlG!✓GI V G618 FEB 2 12017 AnGM Ia. Type of Work: 1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well is proposed for: Drill ❑� 'Lateral ❑Stratigraphic Test ❑ Development - Oil Service - Winj ElSingle Zone 2Coalbed Gas ❑ Gas Hydrates E]Redrill F-1Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket ❑� Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 59-52-180 • CRU CD5-314X 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 26327 TVD: 7409 Colville River Unit ' Alpine Pool - 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Surface: 369' FNL 2694' FEL Sec. 18 Tl l N R4E, UM ' ASRC-NPR4, AAMW, AA082844,AA081817, AA054167 Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 5256' FNL 2811' FEL Sec. 24 T11 N R3E, UM 932669,340758,3407 7. 932552, 366608 4/1/2017 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 1345' FNL 1184' FEL Sec. 1 TION R3E, UM 5032.03, 1280, 3122, 2525, 2556 1184' from AA092675 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 70.1 15. Distance to Nearest Well Open Surface: x-349284 y-5965844 Zone- 4 GL Elevation above MSL (ft): 33.8 , to Same Pool: 5800' from CD5-315 16. Deviated wells: Kickoff depth: 350 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 90 degrees • Downhole: 4224 • Surface: 3486 ---- 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD I MD I TVD (including stage data) 42" 20" 94 H-40 Welded 80 36 361 1I66_____11610 yds. 13-1/2" 10-3/4" 45.5 L-80 H-563/BTC 2464 36 36 _24641 2185 1041 sx 11.0 ppg, 271 sx 15.8 ppg G 9-7/8 x 11" 7-5/8" 29.7 L-80 H-563/BTC 14326 36 36 14326 7388 424 sx 15.8 ppg G 6-3/4" 4-1/2" 12.6 L-80 TXP 12227 14100 7364 26327 7409 uncemented pert pup liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: Property Plat ❑ BOP Sketch Drilling Program Q Time v. Depth Plot ❑ Shallow Hazard Analysis❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program [2 20 AAC 25.050 requirements �✓ 21. 21. Verbal Approval: Commission Representative: ©) Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not "David Lee 263-3741 be deviated from without prior written approval. Contact David. L. Lee(akoD. com Email Printed Name Alvord Title Drilling Manager /Chip Signature ..�, Q Phone 265-6120 Date 2-( Z� (Z -o Commission Use Only Permit to Drill API Number:q Permit Approval See cover letter for other Number: a - Q a 50- D3 - b(,O .SS - m -db Date: requirements. Conditions of approval : If box is checked, wellmaynot be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Other: 130P 1'e 5-1 �J rLSSU c / o ✓3,9LY9 pr-' Samples req'd: Yes No14 Mud log req'd: Yes❑ No� YNo❑ Z�p_l7easures:Yes� Nor❑l /jnnVIarprtl!t�7'e-1- j�f Directional svyreq'd:Yes /VCrtl' )'l1Lt/VtY GI I'Q_vz ft SpacingexcF.fptionreq'd: Yes❑ WE Inclination -only svy req'd: Yes❑ Nog/ ) 7 Post initial injection MIT req'd: Yes ❑ No APPROVED BY Approved by COMMISSIONER THE COMMISSION Date: -3 .2-Z-/? 114.0 AAR_ 117E 3 z / l Submit Form and Forth 10-401 (Revised 11/2015) Ip r 1 v id or 4 months from the date of approval (20 AAC 25.005(g)) Attachments in Duplicate of .�i1©71IN�� ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 February 21, 2017 Alaska Oil and Gas Conservation Commission 333 West T1 Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill CRU CD5-314X Dear Sir or Madam: ConocoPhillips RECEIVED FEB 2 12017 Yl,OG` O ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from the CD5 drilling pad with rig Doyon 19.JThe intended spud date for this well is 04/1/17. CD5-314X is planned to be Kuparuk C sand producer' The 13-1/2" surface hole will TD above the C-30 sand and then 10-3/4" casing will be set and cemented to surface. The intermediate section will be drilled with a 9-7/8" x 11" underreamer BHA and Managed Pressure Drilling technology. This hole will be subsequently cased with a 7-5/8" casing string to surface and cemented to 500' above the uppermost hydrocarbon bearing interval. The suface by intermediate casing annulus will then be evaluated for future annular disposal by performing a leak -off test. ✓ The 6-3/4" production section will then be drilled and completed as a Kuparuk C sand producer with a 4-1/2" liner with perf pups tied back to surface with a 4.5" upper completion string. Please find attached the information required by 20 AAC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: I. Form 10-401 Application For Permit to Drill per 20 AAC 25.005 (a) 2. A proposed drilling program 3. A proposed completion diagram 4. A drilling fluids program summary 5. Pressure information as required by 20 AAC 25.035 (d)(2) 6. Directional drilling / collision avoidance information as required by 20 AAC 25.050 (b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 AAC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact David Lee at 263-3741 (David.L.Lee &conocomhillios.com) or Chip Alvord at 265-6120. mcerely, cc: 1 ' CD5-314X Well File/Ann Haggerty -Sherrod ATO 1530 a� Johnson Njoku ATO 1720 Chip Alvord ATO 1570 David Lee Jason McLennan ATO 1712 Drilling Engineer Lanston Chin Kuukpik Corp Applicatio, Permit to Drill, Well CRU CD5-314X Saved: 17 -Feb -17 CD5-314X Application for Permit to Drill Document Table of Contents 1. Well Name (Requirements of 20 AAC 25.005 (0)............................................................ 3 2. Location Summary (Requirements of20AAC 25.005(c)(2)) ............................................ 3 Requirements of 20 AAC 25.050(b)............................................................................................................. 3 3. Blowout Prevention Equipment Information (Requirements of20 AAC 25.005(c)(3)) 3 4. Drilling Hazards Information (Requirements of20AAC25.005 (c)(4)) ........................4 5. Procedure for Conducting Formation Integrity Tests (Requirements of20AAC25.005 (e)(5))......................................................................................................................... 5 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) .......... 5 7. Diverter System Information (Requirements of20AAC 25.005(c)(7)) ......................... 5 8. Drilling Fluid Program (Requirements of20AAC 25.005(c)(8)) ....................................6 9. Abnormally Pressured Formation Information (Requirements of20AAC 25.005 (c)(9)) ................................................................................................................................... 7 10. Seismic Analysis (Requirements of20AAC 25.005 (c)(10)) ......................................... 7 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005 (c)(11)) ........................ 7 12. Evidence of Bonding (Requirements of20AAC25.005(c)(12))...................................7 13. Proposed Drilling Program (Requirements of20AAC 25.005 (e)(13)) .........................7 14. Discussion of Mud and Cuttings Disposal and Annular Disposal ....................... 9 (Requirements of 20 AAC 25.005(e)(14))............................................................................. 9 15. Attachments............................................................................................................. 10 Attachment I Cement Summary............................................................................................................... 10 CD5-314X APD Page 1 of 15 Printed. 17 -Feb -17 ApplicatiT Permit to Drill, Well CRU CD5-314X Saved: 17 -Feb -17 Attachment 2 Drilling Hazards Summary ................................................................................................. 10 Attachment 3 Completion Schematic........................................................................................................ 10 Attachment 4 Directional Plan................................................................................................................ 10 CD5-314X APD Page 2 of 15 Printed., 17 -Feb -17 Application Permit to Drill, Well CRU CD5-314X 1 Saved: 17 -Feb -17 1. Well Name (Requirements of 20 AAC 25.005 (n) The well for which this application is submitted will be designated as CRU CD5-314X. 2. Location Summary (Requirements of20AAC25.005(c)(2)) This well is planned for Location at Surface 369' FNL, 2694' FEL, Sec. 18, TI IN, ME, UM NAD 1927 Northings: 5,965,844 Eastin s: 349,284 RKB Elevation 70.1' AMSL Pad Elevation 33.8' AMSL Top of Productive Horizon eel 5256' FNL, 2811' FEL, Sec. 24, TI IN, ME, UM NAD 1927 Northings: 5,955,783 Eastings: 344,032 Measured De th, RKB: 14,287' Total Vertical Depth, RKB: 7,385' Total Vertical De th, SS: 1 7,315' Total Depth(Foe) 1345' FNL, 1184' FEL, Sec. 1, T10N, R3E, UM NAD 1927 Northings: 5,943,824 Eastings: 345,416 Measured De th, RKB: 26,327' Total Vertical De th, RKB.- 7,409' Total Vertical De th, SS. 7,339' Requirements of 20 AAC 25.050(5) Please see Attachment 4: Directional Plan The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information (Requirements of20AAC25.005(c)(3)) Please reference BOP schematic on file for Doyon 19. CD5-314X APD Page 3 of 15 Printed: 17 -Feb -17 Application - Permit to Drill, Well CRU CD5-314X Saved: 17 -Feb -17 4. Drilling Hazards Information (Requirements of20AAC25.005(c)(4)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size in Csg Setting Depth MD/TVD(ft) Fracture Gradient(psi) Pore pressure ASP Drilling (psi) 20 116/116 10.9 52 54 10.75 2,464 / 2,185 14.5 977 1,429 7.625 14,326 / 7,388 12.5 4,224 3 486 4.5 26,327 / 7,409 12.5 4,063 3,486 PROCEDURE FOR CALCULATING ANTICIPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing sewith a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the sNe as follows: 1) ASP= [(FG x 0.052) - 0.1]'D 22rj �� O -V Where: ASP = Anticipated Surface pressure in psi jq J `I .0 e FG = Fracture gradient at the casing seat in lb/gal i 0.052 = Conversion from ]b./gal to psi/ft 0.1 =Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB M 2) ASP =FPP - (0.1 x D) Where: FPP = Formation Pore Pressure at the next casing point FPP = 0.4525 x TVD 1. ASP CALCULATIONS Drilling below 20" conductor ASP= [(FG x 0.052) - 0.1] D =[(10.9x0.052) -0.1]x 116=54 psi OR ASP = FPP - (0.1 x D) = 977 - (0.1 x 2185') = 759 psi 2. Drilling below 10-3/4" surface casing ASP = [(FG x 0.052) - 0.1] D = [(14.5 x 0.052) - 0.1] x 2185' = 1429 psi OR ASP = FPP - (0.1 x D) = 4224 - (0.1 x 7385') = 3486 psi Drilling below 7-5/8" intermediate casing ASP = [(FG x 0.052) - 0.1] D _ [(12.5 x 0.052) - 0.11 x 7388 = 4063 psi OR ASP = FPP - (0.1 x D) = 4224- (0.1 x 7388') = 3486 psi CD5-314X APD Page 4 of 15 Printed: 17 -Feb -17 Applicatiop" Permit to Drill, Well CRU CD5-314X 11 Saved: 17 -Feb -17 (B) data on potential gas zones, The well bore is not expected to penetrate any gas zones. (C) data concerning potential causes of hole problems such as abnormally geo pressured strata, lost circulation zones, and zones that have a propensity for differential sticking, Please see Attachment 2 - Drilling Hazards Summary 5. Procedure for Conducting Formation Integrity Tests (Requirements of20AAC25.005 (c)(5)) Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT / FIT procedure that ConocoPhillips Alaska has on file with the Commission. 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) Casing and Cementing Program Csglfbg Hole size(lam) Weight Grade Grade Conn. Top MDlfVD Btm MD/TVD Cement Program OD (in) (re) (re) (h) 20 42 94 H-40 Welded 80 36/36 116/116 10 yds HYD Cement to Surface with 10-3/4 13.5 45.5 L-80 563 X 2,464 36/36 2,464 / 2,185 1041 sx DeepCRETE Lead 11.0 ppg, BTCM 271 sx Class "G' Tail Slurry 15.8 ppg 7-5/8 9.875 29.7 L-80 HYD 563 X 14,326 36/36 14,326 / 7,388 424 sx Class G at 15.8 ppg Stage 1 x11 BTCM 4-1/2 6.75 12.6 L-80 TXP 12,227 14,100 / 7,364 26,327 / 7,409 N/A — Perf pup liner 4-1/2 6.75 12.6 L-80 HYP 563 14,100 36/36 14,100 / 7,364 N/A - production tubing 7. Diverter System Information (Requirements of20AAC25.005(c)(7)) It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h) (2) is granted. At CD5, sixteen penetrations have been completed and there has not been a significant indication of shallow gas or gas hydrates above the C30 where casing will be set. , nn �FCs�NL�II CD5-314X APD Page 5 of 15 Printed., 17 -Feb -17 Applicatio' Permit to Drill, Well CRU CD5-314X Saved: 17-Feb-17 8. Drilling Fluid Program(Requirements of20AAC 25.005(c)(8)) Surface Hole: A mixed -metal oxide fresh water drilling fluid (Drilplex) will be used for the surface interval. Keep flow line viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight <10.0 ppg by use of solids control system and dilutions where necessary. Intermediate #1 Pilot Hole: Fresh water polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. Maintain mud weight at or below 9.6 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up to 10.8 — 11.0 ppg before pulling out of the hole. Note: Managed Pressure Drilling (MPD) will be utilized for adding backpressure during connections to mitigate v" - shale shale instability and cycling. Production Hole: The horizontal production interval will be drilled with a water-based mud drill -in fluid (F1oPro) weighted to 10.0 — 11.5 ppg with calcium carbonate and KCl. Diagram of Doyon 19 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033, CD5-314X APD Page 6 of 15 Printed.., 17 -Feb -17 Surface Intermediate Production Hole Size in. 13.5 9.875 x 11 6.75 Casing Size in. 10.75 7.625 4.5 Density PPG 9.0-10.0 9.6-11.1 10.0-11.5 PV cP ALAP ALAP 15-22 YP Ib./100 ftz 30-50 20-26 10-15 Initial Gels Ib./100 ftz 50 10 6 10 Minute Gels ib./100 ftz 60 15 8 API Fluid Loss cc/30 min. N.C. — 15.0 5.0 4.0 HPHT Fluid Loss cc/30 min. n/a 8.0-12.0 10.0 PH 11.0 9.5-10.0 9.0-9.5 Surface Hole: A mixed -metal oxide fresh water drilling fluid (Drilplex) will be used for the surface interval. Keep flow line viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight <10.0 ppg by use of solids control system and dilutions where necessary. Intermediate #1 Pilot Hole: Fresh water polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. Maintain mud weight at or below 9.6 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up to 10.8 — 11.0 ppg before pulling out of the hole. Note: Managed Pressure Drilling (MPD) will be utilized for adding backpressure during connections to mitigate v" - shale shale instability and cycling. Production Hole: The horizontal production interval will be drilled with a water-based mud drill -in fluid (F1oPro) weighted to 10.0 — 11.5 ppg with calcium carbonate and KCl. Diagram of Doyon 19 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033, CD5-314X APD Page 6 of 15 Printed.., 17 -Feb -17 Application Permit to Drill, Well CRU CD5.314X Saved: 17 -Feb -17 9. Abnormally Pressured Formation Information (Requirements of20AAC25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis(Requirements of20AAC25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of20 AAC 25.005 (c)(11)) N/A - Application is not for an offshore well. 12. Evidence of Bonding (Requirements of20 AAC 25.005 (c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program(Requirements of20AAC25.005(c)(13)) The proposed drilling program is listed below. Please refer to Attachment 3: Completion Schematic. 1. MIRU Doyon 19 onto CD5-314X. 2. Rig up and test riser, dewater cellar as needed. 3. Drill 13.5" hole to the surface casing point as per the directional plan (LWD Program: GR). / 4. Run and cement 10-3/4" surface casing to surface. 5. Install BOPE and MPD equipment. 3 900 P"' 6. Test BOPE to 250 psi low /psi high (24 hr. AOGCC notice). 7. Pick up and run in hole with 9-7/8" x 11" drilling BHA to drill the intermediate hole section. 8. Chart casing pressure test to 3500 psi for 30 minutes. 9. Drill out 20' of new hole and perform LOT. Maximum LOT to 18.0 ppg. Minimum LOT required to drill ahead is 14.0 ppg EMW. 10. Drill 9-7/8" x 11" hole to section TD using Managed Pressure Drilling to maintain constant bottom hole pressure on connections (LWD Program: GR/Res). 11. Change out upper pipe rams to 7-5/8" solid bodies and test same to 3,500 psi. 12. Run 7-5/8" casing and cement to 500' above hydrocarbon bearing zones (cementing schematic attached). 13. Change upper pipe rams to 3-1/2" x 6" VBRs,- 14. Test BOPE to 250 psi low psi high (24 hr. AOGCC notice). 15. Pick up and run in hole with 6-3/4" drilling BHA. 16. Chart casing pressure test to 3500 psi for 30 minutes. 17. Drill out shoe track and 20 feet of new formation. Perform LOT to a maximum of 16.0 ppg. Minimum required leak -off value is 12.0 ppg EMW. 18. Drill 6-3/4" hole to section TD (LWD Program: GR/RES). 19. Pull out of hole with drilling BHA. 20. Run in hole with 4.5" Kuparuk C sand lower completion (uncemented perf pup liner) CD5-314X APD Page 7 of 15 Printed.' 17 -Feb -17 Applicatiol Permit to Drill, Well CRU CD5-314X ' Saved: 17 -Feb -17 21. Set liner hanger and release from liner. Set liner top packer. 22. Displace well to kill weight brine. 23. Run 4.5" upper completion. 24. Space out and land hanger. 25. Install BPV and pressure test hanger seals to 5000 psi. Nipple down BOP. 26. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. 27. Test tubing and tubing -casing annulus separately to 3500 psi / 30 mins. 28. Shear circulation valve in GLM. 29. Circulate tubing to diesel and install freeze protection in the annulus. 30. Set BPV and secure well. RDMO. CD5-314X APD Page 8 of 15 Printed.' 17 -Feb -17 Application Permit to Drill, Well CRU CD5-314X Saved: 17 -Feb -17 14. Discussion of Mud and Cuttings Disposal and Annular Disposal (Requirements of20AAC25.005 (c)(14)) Incidental fluids developed from drilling opeions on well CD5-314X will be injected into a permitted surface casing x production casing annulus on CD5. I The CD5-314X surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. Significant hydrocarbon zones include only Kuparuk sand based on pre -drill interpretations. There will be 500' of cement placed above the top of the Kuparuk reservoir. Once CD5-314X has been drilled and completed, consideration may be given to permit this well for annular injection. An application for Sundry Operations form 10403 will then be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation (C -40).V These 450-500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi _ (12.0 ppg) * (0.052) * (2,185') + 1,500 psi = 2864 psi Pore Pressure = 1,049 psi Therefore Differential = 2864 —1049 = 1815 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: OD Wt (ppf) Grade Range Connection Type Collapse 85% of Collapse Burnt 85% of Burst 10-3/4" 45.5 L-80 3 HYD563/BTCM 2470 psi 2100 DSI 5210 psi 4429 psi 7-5/8" 29.7 L-80 3 HYD563/BTCM 4790 psi 4071 DSI 6890 psi 5856 psi CD5-314X APD Page 9 of 15 Printed. 17 -Feb -17 15. Attachments Attachment) Cement Summary Attachment 2 Drilling Hazards Summary Attachment 3 Completion Schematic Attachment 4 Directional Plan Applicatio{-' Permit to Drill, Well CRU CD5-314X Saved: 17 -Feb -17 CD5-314X APD Page 10 of 15 Punted: 17 -Feb -17 ApplicatioF Permit to Drill, Well CRU CD5-314X Saved: 17 -Feb -17 Attachment 1 — Cement Summary CD5-314X Cementing Program: CD5-314X_wp07 Schematic 14,287' MD / 7,385' TVD i 7-5/8" 29.7 L-80 HYD563 X BTCM Casing 14,326' MD / 7,388' TVD @ 86° r i r I 6-3/4" Hole J. _ . 26,327' M D / 7,409. @.90`. CD5-314X APD Page 11 of 15 Printed: 17 -Feb -17 Applicatior Permit to Drill, Well CRU CD5-314X Saved: 17 -Feb -17 10.75" Surface Casing run to 2,464' MD / 2,1851 TVD Cement from 2464' MD to 1964' (500' of tail) with Class G + Adds. @ 15.8 PPG, and from 1964' to surface with 11.0 ppg DeepCrete. Assume 250% excess annular volume in permafrost and 50% excess below the permafrost (1342' MD), zero excess in 20" conductor. Lead slurry from 1,964' MD to surface with Arctic Lite Crete @ 11.0 ppg Conductor (116'- 36� X 1.3645 ft3/ft X 1.0 (0% excess) = 109 ft3 Permafrost to Conductor (1,342'-116) X 0.3637 ft3/ft X 3.5 (250% excess) = 1,561 ft3 Top of Tail to Permafrost (1,964'- 1,342) X 0.3637 ft3/ftX 1.5 (50% excess) = 340 ft3 Total Volume= 109 + 1,561 + 340 = 2010 ft3 => 1041 sx of 11.0 ppg DeepCrete @ 1.93 fl /sk Tail slurry from 2,464' MD to 1,964' MD with 15.8 ppg Class G + additives Shoe to Top of Tail (2,464'-1,964) X 0.3637 ft3/ft X 1.50 (50% excess) = 273 ft3 Shoe Joint (80) X 0.5400 ft3/ft X 1.0 (0% excess) = 43 ft3 Total Volume = 273 + 43 = 316 ft3 => 271 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% 5002 accelerator @ 1.17 ft3/sk 7.625" Intermediate Casing run to 14,326' MD / 7 388' TVD Top of slurry is designed to be at 13,300' MD, which is 1000' above the Kuparuk C. Assume 40% excess annular volume. * 11" Under reamer is 120' above the 9-7/8" bit. Tail slurry from 14,326' MD to 13,300' MD with 15.8 ppg Class G + additives Shoe to top of 9-7/8" Hole (14,326'- 14,206) X 0.2148 ft3/ft X 1.40 (40% excess) = 36 ft3 11" Hole to to Top of Cement (14,206'- 13,300) X 0.3428 ft3/ft X 1.40 (40% excess) = 435ft3 Shoe Joint (801 X 0.2578 ft3/ft X 1.0 (0% excess) = 21 ft3 Total Volume = 36+ 435 + 21 = 492 ft3 => 424 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% 5002 accelerator @ 1.16 ft3/sk CD5-314X APD Page 12 of 15 Printed: 17 -Feb -17 Application Permit to Drill, Well CRU CD5-314X Saved: 17 -Feb -17 Attachment 2 — Drilling Hazards Summary (To be posted in Rig Floor Doghouse Prior to Spud) 13-1/2" Hole / 10-3/4" Casing Interval Event Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low Gyro single shots, traveling cylinder diagrams Abnormal Reservoir Pressure Low Monitor well at base of permafrost, increased mud weight, decreased Gas Hydrates Low mud viscosity, increased circulating times, controlled drilling rates, Abnormal Reservoir Pressure Medium low mud temperatures Running Sands and Gravel Low Maintain planned mud parameters, Increase mud weight, use Hydrogen Sulfide gas Low weighted sweeps. Lost Circulation Low Reduced pump rates, mud rheology, lost circulation material, use of In— densi cement slurries 9-7/8" x 11" Hole / 7-5/8" Casing Interval Event Risk Level Mitigation Strategy Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent Lost circulation Low circulating density (ECD) monitoring, mud rheology, lost circulation Abnormal Reservoir Pressure Low material Hole swabbing on tris Low Annular pressure applied by managed pressure drilling a ui ment. Abnormal Reservoir Pressure Medium Well control drills, increased mud weight. No mapped faults occur across the path of the planned wellbore. Hydrogen Sulfide gas Low 112S drills, detection systems, alarms, standard well control practices, mud scavengers 6-3/4" Open Hole Production Interval Event Risk Level Mitigation Strategy Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material Hole swabbing on tris Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills, increased mud weight. Hydrogen Sulfide gas Low HZS drills, detection systems, alarms, standard well control practices, mud scavengers CD5-314X APD Page 13 of 15 Printed: 17 -Feb -17 Applicatic, Permit to Drill, Well CRU CD5-314X Saved: 17 -Feb -17 Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in the following attachments. Drilling Area Risks: Reservoir Pressure: Offset injection has the potential to increase reservoir pressure over predicted. Although this is unlikely, the rig will be prepared to weight up if required. Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the intermediate section. Lower Shale Stability: HRZ/Kalubik and instability in the production interval will require higher mud weights and managed pressure drilling in order to stabilize the formations. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation if needed. CD5-314X APD Page 14 of 15 Printed: 17 -Feb -17 Applicatior Dennit to Drill, Well CRU CD5-314X Saved: 17 -Feb -17 Attachment 3 — Completion Schematic CD5-314X Kuparuk C Sand Producer GLM set above packer 4-%" 12.6 ppf L-80 TXP Liner with Perf Pups 14,100-26,327' MD 7 5/8" 29.7 ppf L-80 HYD-563/BTCM 14,326 MD 6-3/4" Hole CD5-314X APD Page 15 of 15 Printed: 17 -Feb -17 j 20" Conductor to 116' Upper Completion: Length 1) 4-Y" 12.6#/0 HYD563 3) DB 3.813" 2) 4-W x 1"Camco KBMG GLM (W) w/ DV 7' j 3) 4K" x 1"Camco KBMG GLM (xx°) w/ DV 7' 1 4) 4-%" x 1" Camco KBMG GLM (W) w/DCK2 7' pinned for 2500 psi casing to tbg shear 3.813" DB Nipple 5) X nipple 3.785" ID 1.$' 6) Down Hole Gauge f€ I 10-3/4" 45.5 ppf L50 HYD-563/BTCM 7) WLEG 1.5' I 2,464' MD Lower Completion: I 8) ZXP Liner Top Packer & Flexlock Liner Hanger 37' j XO 5" Hydril 521 Box X 4-%" TXP pin I 9) XN nipple 3.735" ID 1,5' 10) 4 W, 12.6#/ft, L-80 TXP Liner with Perf Pups I I °L Pert pups with swell packers as necessary I I 4-1/2" 12.6 ppf L-80 HYD -563 I I I I I I I I I I I, a 14,100' MD GLM set above packer 4-%" 12.6 ppf L-80 TXP Liner with Perf Pups 14,100-26,327' MD 7 5/8" 29.7 ppf L-80 HYD-563/BTCM 14,326 MD 6-3/4" Hole CD5-314X APD Page 15 of 15 Printed: 17 -Feb -17 CD5-314Xwp07 - mit Pack Plan Summary HRZ HRZ Base .LCU y, 5 as Permafrost 5 0-30 Albian 96 Kupamk C m se C I 3 Sub96 I Li onCK -$r AIN n \ oc0 J o0 0 �0 TODD 12000 18000, 24000 1,O -12'x 421 Measured DGe,epth ]are' x e -6/e" b it 0 20"x32' turn 10-314" x 13-irz DepNBReference: Plan: 33.8+36.3 @ T0.10usft (018) Rig: Dig &t- - ,¢¢' - ] Sre" x 9-6/8'• by 11acI o0 cd o h �r 0ci 0 3000 6000 9000 12000 15000 16000 21000 24000>e '- 350 Horizontal Departure 0 350 - 530 330 anam 530 - 710 ]10 - 890 890 - 10]0 m 80 1070 - 1240 Ac.300 1240 - 1423 m 2620 - 1420 F2 1600 - Mb U 26303450 30 3650 - 4680 2 270 yg 4680 - 5]00 y 5700 - 6730 ds da ,.. na / / 6]30 - ]]50 7750 - 8780 0 D zaoo 4000 6000 8000 10000 2W _ 8)80 - 9800 9800 - ,18]0 1$ 11870 - 13m SURVEY PROGRAM Swhce Location - 13930 - t6 DepN From DeyN To SurveylPlan Tool North /Y: iso 16900 - te0a 36.30 1]00.00 CD5-314X-P07(Plan: CD&314X) GC -SS East X: 13060-20130 1700.00 2464.26 CD&314Xvo06 tPlan: CD&314X) MWD Pad Elevation: 33.80 210 1700.00 2486.26 CD5-314Xwp06(Plan: CD5-31414WD+IFR-AK-C MIND 20130 u2 fit 2464.28 396428 CD&314X"07(Ran: CDS4X MWD CASING DETAILS 1W 22200 - 222fi 2484.26 14326.22 CD&314XAp06 (Plan DDS3i4 D+IFR-AK-DA2-SD - 14326.22 1582822 CDS314Xwp0](Plan: C05314X MWD TVD MD Name 24260 2626] 1432822 26328.88 CO&314Xwp0](Plan: CD&314121WD+IFR-AK-CAZ-SC 11590 115.90 20•'x42" TNJ 14egne8c Model: BDe1420t6 2185.10 2464.28 10-3/4" x 13112' tugrat. lune! Date: maul!] ]388.10 14326.22 6-Sre" x 9-A9•• by 11' Juana Is De "rebon: 17.06- 7409.10 26328.86 4-1rz•'x&3/4'• Tocoovertafugoe=.fion to a True Wedon, And 1/.06°East SECTION DETAILS Sec ]Face VSect Target Annotation Inc Ali TVD +N/ -S +E/ -W Dleg0. 320., 30 1 30.30 0.00 0.00 38.30 0.00 0.00 0.00 0.00 0.00 Do 2 349.80 0 00 0.00 349.80 0.00 0.00 0.00 0.00 0.00 KOP: Start 1 5°/100• DLS, 190" TF, for 250.18' 3 59868 3]5 190.00 599.80 ease Petmafiasl -B.W -1.42 1.50 19000 6.69 Stan 2.5°/100' OLS, 5' TF, for 888.99' 4 1288.]6 20.97 194.14 12]0.10 -150.88 -35.70 2.50 5.00 144.44 5 1395.86 20.50 194.14 Hold for 10].09• d92AO -45.08 0.00 0.00 169.93 2294.1 2185,10 Start 3.5°/100' DLS, 19.7- TF. for 10684' 8 2484.28 5].50 208.18 2185.10 -692.10 -314.15 3.50 19.]0 ]40.6] 6 2484.28 Hold for 20' 50 208.18 2195.65 -806.9] -322.12 0.00 0.00 ]54.29 ca0 62 Start 35'/100 DLS, 8.83° TF, for 148AT 208.08 2289.91 -919.66 -383.]8 3.50 8.83 857,49 8 2632.45 62.64 Hold for 10287.62' 912920.45 82.64 209.08 6988.25 -8904]4 4823.66 0.00 0.00 8146.62 2832.1 Slant 3'/100' DLS, -62.98° TF, for 1405.6]' 1014326.22 86.00 1]224 6388.1610204.25-5043.41 3.00 -62.989403.04 CD&314XOi.Heel OQ416MA Hold for 20' 1114348.22 86.00 192.24 ]389.50-10224.02-5040.]1 ODO 0.00 9422.99 Start 49100' DLS, 0' TFfor 9808' CC -101214444.26 89.92 172.24 ]392.9&10321.10-502].49 4.00 0.009520.96 Hold far 1188259' , 13 26326.86 89.92 162.24 6409.10-220134.94 -3423.68 0.00 O.OT1403.43 CD5-314X 02 Toe 060416 NA TD: 28328.86' MD, ]409.1' TVD 3]3!181 39861 K2 'an 97. SOW Fails AC against CD5-314. TCR Close a required approach with 03]01 CD5-315 & CD5-315PB1 - ----- NRbn 95 ]0 RL 32 @A 8 arpnnp a e n ade paig.ad[o Me proper pWitim and re approve Me scan and cdlmion avoidance plan as snouttin Neaudit Pack. I approve ilea Ne Raab for Ne finel van plan al ...... .. Prepare! by A�............................................. CM1ecketl bY: � eptetl bY: APProved DY . :............................................. B. Temple N. Beck ' i E. Sterk WeROn9 Dai ! Spider View December 08 (4500 usftlin) —CU5-21 CD5 Alpine West Pad CD5-314Xwp07 Clover A CD5-315PB1 Easting (4500 usftlin) CD5-315 CD5-313PB1 CD5-313 CD4 -07 SI NUM CD2 -47 CD5-05 C�D '-n. c �D4-1� ,'r CD2 -60 CD5-99A a Plan View CD5-314Xwp07 Plan View GQ5-12 0� GOy 02P -- -- --- Goy, 13000- 3000 ---------- ----------20" 20"x 42" - ------------ ---------650010-3/4" 16500- 10-3/4"x 13-1/2" y0y� ° 0 31R GQyoe D G. + o 0$11 o S 0 0y 7-5/8" x 9-7/8" by 11�0 01 ONQOR -6500-- -------- G�y2 1�pOR V CD5-316P61wPO4 �2 0 GQy20 Oa�g°l 15Q� 16000 �QOg l0°l O y01 -13000 17000 18000 �' GQy"19 Oy 1� N 616p1 19000 D5-315P 20000 4-1/2 x 6-3/4" OO CD5 316wp03 22000 ° 3 -19500 _, 23000 00 GD5-315 _-------- hQ\ 240 25000 1a�1Np0 y -26000 -19500 -13000 00 0 6500 13000 19500"-'26000 GD5-314Xwp07 West(-)/East(+) (6500 usft/in) Section View I CD5-314Xwp07 Section View -2500 ------ 20" x 42" 0 0° 1000 10-3/4" x 13-1/2" Base Permafrost--------- 0 N 2500-0C-30— a hoop 0 L C-10 — — 000 o oo CD5-314X 01.Heel 040416 A CD5-314X 02.Toe 040416 A CL ° o Sub9797 0 °� 5000 000 0 0 r --- -- ^ 0° > Albian 96 ^^ 00 o 0 0 ,0 0 0 o O ^� 00 O O O O O O o O 0 0 0 0 0. ori O O O O O ON ` ~ ^I1j v0 O O O O CO O Oo 00 o O O O O OM r N Cl) �' NO N N N N N ANN 7500 _ .- --- ------ — 10000 irierA, Alpine C 0 2500 7-5/8" x 9-7/8" by 11" 5000 7500 10000 12500 15000 Vertical Section at 172.00° (2500 usft/in) 4-1/2" x 6-3/4" 17500 20000 Plan Report ConocoPhillips(Alaska) Inc. -WNS Western North Slope C135 Alpine West Pad Plan: CDS-314X Plan: CDS-314X Plan: CD5-314Xwp07 Standard Proposal Report 07 December, 2016 Database: i OAKEDMP2 Company: ConocoPhillips(Alaska) Inc.-WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-314X Wellbore: Plan: CD5-314X Design: CD5-314Xwp07 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well Plan: CD5-314X Plan: 33.8+36.3 @ 70.10usft (D19) Plan: 33.8+36.3 @ 70.10usft (D19) True Minimum Curvature Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Measured Using Well Reference Point Map Zone: TVD Using geodetic scale factor Dogleg Build Turn Depth Inclination Site CD5 Alpine West Pad system +NIS +E/ -W She Position: Rate Northing: Latitude: (usft) From: Map Easting: Longitude: (usft) Position Uncertainty: 0.00 usft Slot Radius: 13-3116" Grid Convergence: -1.15 ° 36.30 0.00 0.00 36.30 -33.80 Well Plan: CD5-314X 0.00 0.00 0.00 Well Position +NI -S 0.00 usft Northing: 5,965,589.94 usft Latitude: 70° 18' 48.400 N 279.50 +FJ -W 0.00 usft Easting: 1,489,317.35 usft Longitude: 151° 13' 28.777 W Position Uncertainty 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 33.80 usft Wellbore Plan: CD5-314X Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) C) (nT) L _ BGGM2016 7/15/2017 17.06 80.80 57,5012 Design CD5-314Xwp07 Audit Notes: Version: Phase: PLAN Tie On Depth: 36.30 Vertical Section: Depth From (TVD) +NI -S +EJ.W Direction (usft) (usft) (usft) (°) 36.30 0.00 0.00 172.00 Plan Sections Measured Vertical TVD Dogleg Build Turn Depth Inclination Azimuth Depth system +NIS +E/ -W Rate Rate Rate Toot Face (usft) (°) V) (usft) usft (usft) (usft) (°/100usft) (°1100usft) (°1100usft) (°) 36.30 0.00 0.00 36.30 -33.80 0.00 0.00 0.00 0.00 0.00 0.00 349.60 0.00 0.00 349.60 279.50 0.00 0.00 0.00 0.00 0.00 0.00 599.78 3.75 190.00 599.60 529.50 -8.07 -1.42 1.50 1.50 0.00 190.00 1,288.77 20.97 194.14 1,270.10 1,200.00 -150.88 -35.70 2.50 2.50 0.60 5.00 1,395.86 20.97 194.14 1,370.10 1,300.00 -188.03 45.06 0.00 0.00 0.00 0.00 2,464.26 57.50 208.18 2,185.10 2,115.00 -792.10 -314.15 3.50 3.42 1.31 19.70 2,484.26 57.50 208.18 2,195.85 2,125.75 -806.97 -322.12 0.00 0.00 0.00 0.00 2,632.73 62.64 209.08 2,269.91 2,199.81 -919,86 -383.78 3.50 3.46 0.60 8.83 12,920.45 62.64 209.08 6,998.25 6,928.15 -8,904.74 4,824.67 0.00 0.00 0.00 0.00 14,326.22 86.00 172.24 7,388.10 7,318.00 -10,204.25 -5,043.41 3.00 1.66 -2.62 -62.98 14,346.22 86.00 172.24 7,389.50 7,319.40 -10,224.02 -5,040.71 0.00 0.00 0.00 0.00 14,444.27 89.92 172.24 7,392.98 7,322.88 -10,321.10 -5,027.49 4.00 4.00 0.00 0.00 26,326.86 89.92 172.24 7,409.10 7,339.00 -22,094,94 -3,423.68 0.00 0.00 0.00 0.00 12/72016 2:17:53PM Page 2 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: CD5-314X Company: ConocoPhiilips(Alaska) Inc. -WNS TVD Reference: Plan: 33.8+36.3 Q 70.10usft (D19) Project: Western North Slope MD Reference: Plan: 33.8+36.3 @ 70.10usft (D19) Site: COS Alpine West Pad North Reference: True Well: Plan: CD5-314X Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-314X Depth Inclination Design: CD5-314Xwp07 TVDss +WS Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +WS +FJ -W Northing Easting DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) (usft) (usft) 53.80 36.30 0.00 0.00 36.30 -33.80 0.00 0.00 5,965,589.94 1,489,317.35 0.00 0.00 100.00 0.00 0.00 100.00 29.90 0.00 0.00 5,965,589.94 1,489,317.35 0.00 0.00 115.90 0.00 0.00 115.90 45.80 0.00 0.00 5,965,589.94 1,489,317.35 0.00 0.00 20" x 42" 200.00 0.00 0.00 200.00 129.90 0.00 0.00 5,965,589.94 1,489,317.35 0.00 0.00 300.00 0.00 0.00 300.00 229.90 0.00 0.00 5,965,589.94 1,489,317.35 0.00 0.00 349.60 0.00 0.00 349.60 279.50 0.00 0.00 5,965,589.94 1,489,317.35 0.00 0.00 KOP: Start 1.5.1100' DLS, 190' TF, for 250.18' 400.00 0.76 190.00 400.00 329.90 -0.33 -0.06 5,965,589.61 1,489,317.29 1.50 0.32 500.00 2.26 190.00 499.96 429.86 -2.92 -0.51 5,965,587.04 1,489,316.78 1.50 2.82 599.78 3.75 190.00 599.60 529.50 -8.07 -1.42 5,965,581.91 1,489,315.77 1.50 7.79 Start 2.5°1100' DLS, 5° TF, for 668.99' 600.00 3.75 190.00 599.82 529.72 -8.08 -1.42 5,965,581.89 1,489,315.76 0.00 7.80 700.00 6.25 192.00 699.43 629.33 -16.64 -3.13 5,965,573.37 1,489,313.89 2.51 16.04 800.00 8.75 192.87 798.57 728.47 -29.38 -5.95 5,965,560.69 1,489,310.81 2,50 28.26 900.00 11.25 193.35 897.04 826.94 -46.29 -9.90 5,965,543.87 1,489,306.52 2.50 44.46 1,000.00 13.75 193.65 994.66 924.56 -67.33 -14.96 5,965,522.93 1,489,301.04 2.50 64.59 1,100.00 16.25 193.87 1,091.25 1,021.15 -92.46 -21.11 5,965,497.93 1,489,294.38 2.50 88.62 1,200.00 18.75 194.03 1,186.62 1,116.52 -121.63 -28.36 5,965,468.91 1,489,286.55 2.50 116.50 1,288.77 20.97 194.14 1,270.10 1,200.00 -150.88 35.70 5,965,439.82 1,489,278.62 2.50 144,44 Hold for 107.09' 1,300.00 20.97 194.14 1,280.59 1,210.49 -154.77 -36.68 5,965,435.95 1,489,277.56 0.00 148.16 1,342.31 20.97 194.14 1,320.10 1,250.00 -169.46 -40.38 5,965,421.34 1,489,273.57 0.00 162.19 Base Permafrost 1,395.86 20.97 194.14 1,370.10 1,300.00 -188.03 45.06 5,965,402.86 1,489,268.52 0.00 179.93 Start 3.5°/100' DLS, 19.7° TF, for 1068.4' 1,400.00 21.10 194.27 1,373.97 1,303.87 -189.48 45.42 5,965,401.43 1,489,268.13 3.50 181.31 1,500.00 24.43 197.11 1,466.17 1,396.07 -226.70 55.95 5,965,364.43 1,489,256.86 3.50 216.70 1,600.00 27.79 199.30 1,555.95 1,485.85 -268.47 -69.74 5,965,322.94 1,489,242.23 3.50 256.16 1,700.00 31.19 201.04 1,642.99 1,572.89 -314.66 -86.74 5,965,277.12 1,489,224.30 3.50 299.52 1,800.00 34.60 202.48 1,726.95 1,656.85 -365.07 -106.90 5,965,227.12 1,489,203.13 3.50 346.64 1,900.00 38.02 203.68 1,807.52 1,737.42 419.52 -130.13 5,965,173.15 1,489,178.81 3.50 397.33 2,000.00 41.46 204.72 1,884.40 1,814.30 477.82 -156.36 5,965,115.40 1,489,151.42 3.50 451.41 2,100.00 44.91 205.62 1,957.30 1,887.20 -539.74 -185.47 5,965,054.08 1,489,121.07 3.50 508.67 2,200.00 48.36 206.42 2,025.96 1,955.86 -605.05 -217.37 5,964,989.44 1,489,087.86 3.50 568.91 2,300.00 51.81 207.14 2,090.12 2,020.02 -673.50 -251.94 5,964,921.69 1,489,051.93 3.50 631.89 2,400.00 55.27 207.79 2,149.53 2,079.43 -744.85 -289.04 5,964,851.11 1,489,013.40 3.50 697.38 2,464.26 57.50 208.18 2,185.10 2,115.00 -792.10 -314.15 5,964,804.38 1,488,987.34 3.50 740.67 Hold for 20' -103/4" x 13412" 2,484.26 57.50 208.18 2,195.85 2,125.75 -806.97 322.12 5,964,789.67 1,488,979.08 0.00 754.29 Start 3.5°1100' DLS, 8.830 TF, for 148.47' 2,500.00 58.04 208.28 2,204.24 2,134.14 -818.70 -328.42 5,964,778.07 1,488,972.55 3.50 765.03 2,600.00 61.50 208.89 2,254.57 2,184.47 -894.56 -369.76 5,964,703.07 1,488,929.69 3.50 834.39 2,632.73 62.64 209.08 2,269.91 2,199.81 -919.86 -383.78 5,964,678.06 1,488,915.17 3.50 857.49 12/72016 2:1753PM Page 3 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: C05 -314X Company: ConomPhillips(Alasks) Inc. -WNS TVD Reference: Plan: 33.8+36.3 @ 70.10usft (1319) Project: Western North Slope MD Reference: Plan: 33.8+36.3 @ 70.10usft (D19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-314X Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-314X Depth Inclination Design: CD5-314Xwp07 TVDss +W -S Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +W -S +EI -W Northing Easting DLS Vert Section (usft) (•) (•) (usft) usft (usft) (usft) (usft) (usft) 2,199.81 2,632.75 62.64 209.08 2,269.91 2,199.81 -919.87 -383.79 5,964,678.05 1,488,915.16 0.00 857.50 Hold for 10287.72' 2,685.38 62.64 209.08 2,294.10 2,224.00 -960.72 -406.50 5,964,637.67 1,488,891.63 0.00 894.79 Cao 2,700.00 62.64 209.08 2,300.82 2,230.72 -972.07 412.82 5,964,626.45 1,488,885.09 0.00 905.15 2,800.00 62.64 209.08 2,346.78 2,276.68 -1,049.68 455.98 5,964,549.72 1,488,840.37 0.00 976.01 2,900.00 62.64 209.08 2,392.74 2,322.64 -1,127.30 499.15 5,964,473.00 1,488,795.65 0.00 1,046.86 3,000.00 62.64 209.08 2,438.70 2,368.60 -1,204.91 -542.32 5,964,396.27 1,488,750.94 0.00 1,117.71 3,100.00 62.64 209.08 2,484.67 2,414.57 -1,282.53 -585.48 5,964,319.55 1,488,706.22 0.00 1,188.56 3,200.00 62.64 209.08 2,530.63 2,460.53 -1,360.14 -628.65 5,964,242.82 1,488,661.50 0.00 1,259.42 3,300.00 62.64 209.08 2,576.59 2,506.49 -1,437.76 -671.82 5,964,166.10 1,488,616.79 0.00 1,330.27 3,400.00 62.64 209.08 2,622.55 2,552.45 -1,515.38 -714.98 5,964,089.37 1,488,572.07 0.00 1,401.12 3,500.00 62.64 209.08 2,668.51 2,598.41 -1,592.99 -758.15 5,964,012.65 1,488,527.35 0.00 1,471.97 3,600.00 62.64 209.08 2,714.47 2,644.37 -1,670.61 -801.32 5,963,935.92 1,488,482.64 0.00 1,542.83 3,700.00 62.64 209.08 2,760.43 2,690.33 -1,748.22 -844.49 5,963,859.19 1,488,437.92 0.00 1,613.68 3,800.00 62.64 209.08 2,806.39 2,736.29 -1,825.84 -887.65 5,963,782.47 1,488,393.20 0.00 1,684.53 3,855.93 62.64 209.08 2,832.10 2,762.00 -1,869.25 -911.80 5,963,739.56 1,488,368.19 0.00 1,724.16 C-10 3,900.00 62.64 209.08 2,852.35 2,782.25 -1,903.45 -930.82 5,963,705.74 1,488,348.49 0.00 1,755.38 4,000.00 62.64 209.08 2,898.32 2,828.22 -1,981.07 -973.99 5,963,629.02 1,488,303.77 0.00 1,826.24 4,100.00 62.64 209.08 2,944.28 2,874.18 -2,058.69 -1,017.15 5,963,552.29 1,488,259.05 0.00 1,897.09 4,200.00 62.64 209.08 2,990.24 2,920.14 -2,136.30 -1,060.32 5,963,475.57 1,488,214.34 0.00 1,967.94 4,300.00 62.64 209.08 3,036.20 2,966.10 -2,213.92 -1,103.49 5,963,398.84 1,488,169.62 0.00 2,038.80 4,400.00 62.64 209.08 3,082.16 3,012.06 -2,291.53 -1,146.65 5,963,322.12 1,488,124.90 0.00 2,109.65 4,500.00 62.64 209.08 3,128.12 3,058.02 -2,369.15 -1,189.82 5,963,245.39 1,488,080.18 0.00 2,180.50 4,600.00 62.64 209.08 3,174.08 3,103.98 -2,446.76 -1,232.99 5,963,168.66 1,488,035.47 0.00 2,251.35 4,700.00 62.64 209.08 3,220.04 3,149.94 -2,524.38 -1,276.15 5,963,091.94 1,487,990.75 0.00 2,322.21 4,800.00 62.64 209.08 3,266.00 3,195.90 -2,602.00 -1,319.32 5,963,015.21 1,487,946.03 0.00 2,393.06 4,900.00 62.64 209.08 3,311.97 3,241.87 -2,679.61 -1,362.49 5,962,938.49 1,487,901.32 0.00 2,463.91 5,000.00 62.64 209.08 3,357.93 3,287.83 -2,757.23 -1,405.65 5,962,861.76 1,487,856.60 0.00 2,534.76 5,100.00 62.64 209.08 3,403.89 3,333.79 -2,834.84 -1,448.82 5,962,785.04 1,487,811.88 0.00 2,605.62 5,200.00 62.64 209.08 3,449.85 3,379.75 -2,912.46 -1,491.99 5,962,708.31 1,487,767.17 0.00 2,676.47 5,300.00 62.64 209.08 3,495.81 3,425.71 -2,990.07 -1,535.16 5,962,631.58 1,487,722.45 0.00 2,747.32 5,400.00 62.64 209.08 3,541.77 3,471.67 -3,067.69 -1,578.32 5,962,554.86 1,487,677.73 0.00 2,818.17 5,500.00 62.64 209.08 3,587.73 3,517.63 -3,145.31 -1,621.49 5,962,478.13 1,487,633.02 0.00 2,889.03 5,600.00 62.64 209.08 3,633.69 3,563.59 -3,222.92 -1,664.66 5,962,401.41 1,487,588.30 0.00 2,959.88 5,700.00 62.64 209.08 3,679.65 3,609.55 -3,300.54 -1,707.82 5,962,324.68 1,487,543.58 0.00 3,030.73 5,800.00 62.64 209.08 3,725.62 3,655.52 -3,378.15 -1,750.99 5,962,247.96 1,487,498.87 0.00 3,101.59 5,827.16 62.64 209.08 3,738.10 3,668.00 -3,399.23 -1,762.71 5,962,227.12 1,487,486.72 0.00 3,120.83 Ka 5,900.00 62.64 209.08 3,771.58 3,701.48 -3,455.77 -1,794.16 5,962,171.23 1,487,454.15 0.00 3,172.44 6,000.00 62.64 209.08 3,817.54 3,747.44 -3,533.38 -1,837.32 5,962,094.51 1,487,409.43 0.00 3,243.29 6,100.00 62.64 209.08 3,863.50 3,793.40 -3,611.00 -1,880.49 5,962,017.78 1,487,364.72 0.00 3,314.14 6,200.00 62.64 209.08 3,909.46 3,839.36 -3,688.62 -1,923.66 5,961,941.05 1,487,320.00 0.00 3,385.00 6,300.00 62.64 209.08 3,955.42 3,885.32 -3,766.23 -1,966.82 5,961,864.33 1,487,275.28 0.00 3,455.85 12172016 2:17.53PM Page 4 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: CD5-314X Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Plan: 33.8+36.3 @ 70.10usft (D19) Project: Western North Slope MD Reference: Plan: 33.8+36.3 @ 70.10usft (D19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-314X Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5314X Depth Inclination Design: CD5314Xwp07 TVDss +WS Punned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +WS +E1 -W Northing Easting DLS VertSection (Usft) C) (0) Nall) usft (usft) (usft) (usft) (usft) 3,916.00 6,366.75 62.64 209.08 3,986.10 3,916.00 -3,818.04 -1,995.64 5,961,813.12 1,487,245.43 0.00 3,503.14 K-2 6,400.00 62.64 209.08 4,001.38 3,931.28 -3,643.85 -2,009.99 5,961,787.60 1,487,230.57 0.00 3,526.70 6,500.00 62.64 209.08 4,047.34 3,977.24 -3,921.46 -2,053.16 5,961,710.88 1,487,185.85 0.00 3,597.55 6,600.00 62.64 209.08 4,093.30 4,023.20 -3,999.08 -2,096.32 5,961,634.15 1,487,141.13 0.00 3,668.41 6,700.00 62.64 209.08 4,139.27 4,069.17 -4,076.69 -2,139.49 5,961,557.43 1,487,096.42 0.00 3,739.26 6,800.00 62.64 209.08 4,185.23 4,115.13 4,154.31 -2,182.66 5,961,480.70 1,487,051.70 0.00 3,810.11 6,900.00 62.64 209.08 4,231.19 4,161.09 -4,231.92 -2,225.82 5,961,403.98 1,487,006.98 0.00 3,880.97 7,000.00 62.64 209.08 4,277.15 4,207.05 4,309.54 -2,268.99 5,961,327.25 1,486,962.27 0.00 3,951.82 7,100.00 62.64 209.08 4,323.11 4,253.01 -4,387.16 -2,312.16 5,961,250.52 1,486,917.55 0.00 4,022.67 7,117.38 62.64 209.08 4,331.10 4,261.00 -4,400.65 -2,319.66 5,961,237.19 1,486,909.78 0.00 4,034.99 Albian 97 7,200.00 62.64 209.08 4,369.07 4,298.97 4,464.77 -2,355.33 5,961,173.80 1,486,872.83 0.00 4,093.52 7,300.00 62.64 209.08 4,415.03 4,344.93 -4,542.39 -2,398.49 5,961,097.07 1,486,828.11 0.00 4,164.38 7,358.89 62.64 209.08 4,442.10 4,372.00 4,588.10 -2,423.91 5,961,051.89 1,486,801.78 0.00 4,206.10 Sub97 7,400.00 62.64 209.08 4,460.99 4,390.89 -4,620.00 -2,441.66 5,961,020.35 1,486,783.40 0.00 4,235.23 7,500.00 62.64 209.08 4,506.95 4,436.85 -4,697.62 -2,484.83 5,960,943.62 1,486,738.68 0.00 4,306.08 7,600.00 62.64 209.08 4,552.92 4,482.82 4,775.23 -2,527.99 5,960,866.90 1,486,693.96 0.00 4,376.93 7,700.00 62.64 209.08 4,598.88 4,528.78 -4,852.85 -2,571.16 5,960,790.17 1,486,649.25 0.00 4,447.79 7,800.00 62.64 209.08 4,644.84 4,574.74 4,930.47 -2,614.33 5,960,713.45 1,486,604.53 0.00 4,518.64 7,900.00 62.64 209.08 4,690.80 4,620.70 -5,008.08 -2,657.49 5,960,636.72 1,486,559.81 0.00 4,589.49 8,000.00 62.64 209.08 4,736.76 4,666.66 5,085.70 -2,700.66 5,960,559.99 1,486,515.10 0.00 4,660.34 8,100.00 62.64 209.08 4,782.72 4,712.62 -5,163.31 -2,743.83 5,960,483.27 1,486,470.38 0.00 4,731.20 8,200.00 62.64 209.08 4,828.68 4,758.58 5,240.93 -2,786.99 5,960,406.54 1,486,425.66 0.00 4,802.05 8,300.00 62.64 209.08 4,874.64 4,804.54 .5,318.54 -2,830.16 5,960,329.82 1,486,380.95 0.00 4,872.90 8,400.00 62.64 209.08 4,920.60 4,850.50 -5,396.16 -2,873.33 5,960,253.09 1,486,336.23 0.00 4,943.76 8,500.00 62.64 209.08 4,966.57 4,896.47 5,473.78 -2,916.49 5,960,176.37 1,486,291.51 0.00 5,014.61 8,600.00 62.64 209.08 5,012.53 4,942.43 -5,551.39 -2,959.66 5,960,099.64 1,486,246.80 0.00 5,085.46 8,700.00 62.64 209.08 5,058.49 4,988.39 -5,629.01 -3,002.83 5,960,022.91 1,486,202.08 0.00 5,156.31 8,800.00 62.64 209.08 5,104.45 5,034.35 -5,706.62 -3,046.00 5,959,946.19 1,486,157.36 0.00 5,227.17 81900.00 62.64 209.08 5,150.41 5,080.31 5,784.24 -3,089.16 5,959,869.46 1,486,112.65 0.00 5,298.02 9,000.00 62.64 209.08 5,196.37 5,126.27 -5,861.85 -3,132.33 5,959,792.74 1,486,067.93 0.00 5,368.87 9,100.00 62.64 209.08 5,242.33 5,172.23 -5,939.47 3,175.50 5,959,716.01 1,486,023.21 0.00 5,439.72 9,200.00 62.64 209.08 5,288.29 5,218.19 5,017.09 -3,218.66 5,959,639.29 1,485,978.50 0.00 5,510.58 9,300.00 62.64 209.08 5,334.25 5,264.15 $,094.70 -3,261.83 5,959,562.56 1,485,933.78 0.00 5,581.43 9,377.99 62.64 209.08 5,370.10 5,300.00 -6,155.23 -3,295.50 5,959,502.72 1,485,898.90 0.00 5,636.69 Albian 96 9,400.00 62.64 209.08 5,380.22 5,310.12 -6,172.32 -3,305.00 5,959,485.84 1,485,889.06 0.00 5,652.28 9,500.00 62.64 209.08 5,426.18 5,356.08 -6,249.93 -3,348.16 5,959,409.11 1,485,844.35 0.00 5,723.13 9,600.00 62.64 209.08 5,472.14 5,402.04 -6,327.55 -3,391.33 5,959,332.38 1,485,799.63 0.00 5,793.99 9,700.00 62.64 209.08 5,518.10 5,448.00 -6,405.16 -3,434.50 5,959,255.66 1,485,754.91 0.00 5,864.84 9,800.00 62.64 209.08 5,564.06 5,493.96 -6,482.78 -3,477.66 5,959,178.93 1,485,710.20 0.00 5,935.69 9,900.00 62.64 209.08 5,610.02 5,539.92 -6,560.40 -3,520.83 5,959,102.21 1,485,665.48 0.00 6,006.55 10,000.00 62.64 209.08 5,655.98 5,585.88 5,638.01 -3,564.00 5,959,025.48 1,485,620.76 0.00 6,077.40 12/72016 2:17:53PM Page 5 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: CD5-314X Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Plan: 33.8+36.3 Q 70.10usft (D19) Project: Western North Slope MD Reference: Plan: 33.8+36.3 Q 70.10usft (D19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: C05 -314X Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD"14X Depth Inclination Design: CD5-314Xwp07 TVDss +WS Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +WS +FJ -W Northing Fasting DILS Vert Section (usft) (1) (1) (usft) usft (usft) (usft) (usft) (usft) 5,631.84 10,100.00 62.64 209.08 5,701.94 5,631.84 -6,715.63 -3,607.16 5,958,948.76 1,485,576.05 0.00 6,148.25 10,200.00 62.64 209.08 5,747.90 5,677.80 -6,793.24 -3,650.33 5,958,872.03 1,485,531.33 0.00 6,219.10 10,300.00 62.64 209.08 5,793.87 5,723.77 -6,870.86 -3,693.50 5,958,795.31 1,485,486.61 0.00 6,289.96 10,400.00 62.64 209.08 5,839.83 5,769.73 -6,948.47 -3,736.67 5,958,718.58 1,485,441.89 0.00 6,360.81 10,500.00 62.64 209.08 5,885.79 5,815.69 -7,026.09 -3,779.83 5,958,641.85 1,485,397.18 0.00 6,431.66 10,600.00 62.64 209.08 5,931.75 5,861.65 -7,103.71 -3,823.00 5,958,565.13 1,485,352.46 0.00 6,502.51 10,700.00 62.64 209.08 5,977.71 5,907.61 -7,181.32 -3,866.17 5,958,488.40 1,485,307.74 0.00 6,573.37 10,800.00 62.64 209.08 6,023.67 5,953.57 -7,258.94 -3,909.33 5,958,411.68 1,485,263.03 0.00 6,644.22 10,900.00 62.64 209.08 6,069.63 5,999.53 -7,336.55 -3,952.50 5,958,334.95 1,485,218.31 0.00 6,715.07 11,000.00 62.64 209.08 6,115.59 6,045.49 -7,414.17 .3,995.67 5,958,258.23 1,485,173.59 0.00 6,785.93 11,100.00 62.64 209.08 6,161.55 6,091.45 -7,491.78 -4,038.83 5,958,181.50 1,485,128.88 0.00 6,856.78 11,200.00 62.64 209.08 6,207.52 6,137.42 -7,569.40 -4,082.00 5,958,104.77 1,485,084.16 0.00 6,927.63 11,300.00 62.64 209.08 6,253.48 6,183.38 -7,647.02 -4,125.17 5,958,028.05 1,485,039.44 0.00 6,998.48 11,400.00 62.64 209.08 6,299.44 6,229.34 -7,724.63 4,168.33 5,957,951.32 1,484,994.73 0.00 7,069.34 11,500.00 62.64 209.08 6,345.40 6,275.30 -7,802.25 4,211.50 5,957,874.60 1,484,950.01 0.00 7,140.19 11,600.00 62.64 209.08 6,391.36 6,321.26 -7,879.86 4,254.67 5,957,797.87 1,484,905.29 0.00 7,211.04 11,700.00 62.64 209.08 6,437.32 6,367.22 -7,957.48 4,297.83 5,957,721.15 1,484,860.58 0.00 7,281.89 11,800.00 62.64 209.08 6,483.28 6,413.18 -8,035.09 4,341.00 5,957,644.42 1,484,815.86 0.00 7,352.75 11,900.00 62.64 209.08 6,529.24 6,459.14 -8,112.71 4,384.17 5,957,567.70 1,484,771.14 0.00 7,423.60 12,000.00 62.64 209.08 6,575.20 6,505.10 -8,190.33 4,427.34 5,957,490.97 1,484,726.43 0.00 7,494.45 12,100.00 62.64 209.08 6,621.17 6,551.07 -8,267.94 4,470.50 5,957,414.24 1,484,681.71 0.00 7,565.30 12,200.00 62.64 209.08 6,667.13 6,597.03 -8,345.56 4,513.67 5,957,337.52 1,484,636.99 0.00 7,636.16 12,300.00 62.64 209.08 6,713.09 6,642.99 -8,423.17 4,556.84 5,957,260.79 1,484,592.28 0.00 7,707.01 12,400.00 62.64 209.08 6,759.05 6,688.95 -8,500.79 4,600.00 5,957,184.07 1,484,547.56 0.00 7,777.86 12,500.00 62.64 209.08 6,805.01 6,734.91 -8,578.40 4,643.17 5,957,107.34 1,484,502.84 0.00 7,848.72 12,600.00 62.64 209.08 6,850.97 6,780.87 -8,656.02 4,686.34 5,957,030.62 1,484,458.13 0.00 7,919.57 12,700.00 62.64 209.08 6,896.93 6,826.83 -8,733.64 -4,729.50 5,956,953.89 1,484,413.41 0.00 7,990.42 12,800.00 62.64 209.08 6,942.89 6,872.79 -8,811.25 4,772.67 5,956,877.17 1,484,368.69 0.00 8,061.27 12,900.00 62.64 209.08 6,988.86 6,918.76 -8,888.87 4,815.84 5,956,800.44 1,484,323.98 0.00 8,132.13 12,920.45 62.64 209.08 6,998.25 6,928.15 -8,904.74 4,824.67 5,956,784.75 1,484,314.83 0.00 8,146.62 12,920.57 62.64 209.08 6,998.31 6,928.21 -8,904.83 4,824.71 5,956,784.66 1,484,314.78 0.00 8,146.70 Start 3°N00' DLS, .62.98° TF, for 1405.77' 13,000.00 63.74 206.71 7,034.14 6,964.04 -8,967.48 4,857.87 5,956,722.69 1,484,280.37 3.00 8,204.13 13,013.52 63.93 206.31 7,040.10 6,970.00 -8,978.35 4,863.29 5,956,711.94 1,484,274.73 3.00 8,214.13 HRZ 13,100.00 65.18 203.79 7,077.25 7,007.15 -9,049.08 4,896.35 5,956,641.89 1,484,240.26 3.00 8,279.58 13,200.00 66.68 200.95 7,118.04 7,047.94 -9,133.51 4,931.08 5,956,558.18 1,484,203.84 3.00 8,358.35 13,300.00 68.23 198.16 7,156.39 7,086.29 -9,220.53 4,961.98 5,956,471.81 1,484,171.20 3.00 8,440.22 13,400.00 69.82 195.44 7,192.19 7,122.09 -9,309.91 4,988.95 5,956,383.00 1,484,142.43 3.00 8,524.98 13,500.00 71.45 192.77 7,225.35 7,155.25 -9,401.40 -5,011.94 5,956,292.00 1,484,117.62 3.00 8,612.37 13,600.00 73.13 190.16 7,255.77 7,185.67 -9,494.74 -5,030.86 5,956,199.06 1,484,096.82 3.00 8,702.18 13,650.62 73.98 188.85 7,270.10 7,200.00 -9,542.62 -5,038.88 5,956,151.36 1,464,087.84 3.00 8,748.48 HRZ Base 13,700.00 74.83 187.59 7,283.38 7,213.28 -9,589.70 -5,045.68 5,956,104.43 1,484,080.10 3.00 8,794.15 13,800.00 76.56 185.06 7,308.09 7,237.99 -9,686.00 -5,056.34 5,956,008.37 1,484,067.50 3.00 8,888.03 12/72016 2:1753PM Page 6 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: CD5.314X Company: ConowPhillips(Alaska) Inc. -WNS TVD Reference: Plan: 33.8+36.3 @ 70.10usft (019) Project: Western North Slope MD Reference: Plan: 33.8+36.3 @ 70.10usft (D19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-314X Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-314X 0 (•) Design: CD5-314Xwp07 (usft) (usft) Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +WS +E1 -W Northing Easting DLS Vert Section (usft) 0 (•) (usft) usft (usft) (usft) (usft) (usft) 7,259.74 13,900.00 78.32 182.57 7,329.84 7,259.74 -9,783.37 -5,062.83 5,955,911.15 1,484,059.05 3.00 8,983.55 14,000.00 80.09 180.11 7,348.57 7,278.47 -9,881.57 -5,065.12 5,955,813.03 1,484,054.79 3.00 9,080.47 14,100.00 81.89 177.68 7,364.23 7,294.13 -9,980.30 -5,063.20 5,955,714.28 1,484,054.72 3.00 9,178.51 14,200.00 83.70 175.26 7,376.77 7,306.67 -10,079.31 -5,057.09 5,955,615.18 1,484,058.84 3.00 9,277.41 14,286.76 85.28 173.19 7,385.10 7,315.00 -10,165.22 -5,048.40 5,955,529.12 1,484,065.80 3.00 9,363.70 Kuparuk C 14,300.00 85.52 172.87 7,386.16 7,316.06 -10,178.33 -5,046.79 5,955,515.99 1,484,067.14 3.00 9,376.89 14,326.22 86.00 172.24 7,388.10 7,318.00 -10,204.25 -5,043.41 5,955,490.00 1,484,070.00 3.00 9,403.04 75/8" x 9.7/8" by 11" 14,326.34 86.00 172.24 7,388.11 7,318.01 -10,204.38 -5,043.39 5,955,489.87 1,484,070.01 0.00 9,403.16 Hold for 20' 14,346.22 86.00 172.24 7,389.50 7,319.40 -10,224.02 -5,040.71 5,955,470.18 1,484,072.29 0.00 9,422.99 14,346.34 86.00 172.24 7,389.50 7,319.40 -10,224.14 -5,040.70 5,955,470.06 1,484,072.31 0.00 9,423.11 Start 4•/100' DLS, 0- TF, for 98.06- 14,395.88 87.99 172.24 7,392.10 7,322.00 -10,273.16 -5,034.02 5,955,420.92 1,484,078.00 4.01 9,472.58 LCU 14,400.00 88.15 172.24 7,392.24 7,322.14 -10,277.24 -5,033.46 5,955,416.83 1,484,078.47 4.00 9,476.70 14,444.27 89.92 172.24 7,392.98 7,322.88 -10,321.10 -5,027.49 5,955,372.86 1,484,083.56 4.00 9,520.96 14,444.40 89.92 172.24 7,392.98 7,322.88 -10,321.22 5,027.47 5,955,372.74 1,484,083.58 0.00 9,521.09 Hold for 11882.59' 14,500.00 89.92 172.24 7,393.06 7,322.96 -10,376.31 -5,019.97 5,955,317.51 1,484,089.97 0.00 9,576.69 14,600.00 89.92 172.24 7,393.19 7,323.09 -10,475.40 -5,006.47 5,955,218.18 1,484,101.47 0.00 9,676.69 14,700.00 89.92 172.24 7,393.33 7,323.23 -10,574.48 -4,992.97 5,955,118.85 1,484,112.97 0.00 9,776.69 14,800.00 89.92 172.24 7,393.47 7,323.37 -10,673.57 -4,979.48 5,955,019.52 1,484,124.47 0.00 9,876.68 14,900.00 89.92 172.24 7,393.60 7,323.50 -10,772.65 -4,965.98 5,954,920.20 1,484,135.97 0.00 9,976.68 15,000.00 89.92 172.24 7,393.74 7,323.64 -10,871.74 -4,952.48 5,954,820.87 1,484,147.47 0.00 10,076.68 15,100.00 89.92 172.24 7,393.87 7,323.77 -10,970.82 -4,938.99 5,954,721.54 1,484,158.97 0.00 10,176.68 15,200.00 89.92 172.24 7,394.01 7,323.91 -11,069.91 -4,925.49 5,954,622.21 1,484,170.47 0.00 10,276.68 15,300.00 89.92 172.24 7,394.14 7,324.04 -11,168.99 -4,911.99 5,954,522.88 1,484,181.97 0.00 10,376.68 15,400.00 89.92 172.24 7,394.28 7,324.18 -11,268.08 -4,898.49 5,954,423.55 1,484,193.46 0.00 10,476.68 15,500.00 89.92 172.24 7,394.41 7,324.31 -11,367.16 4,885.00 5,954,324.22 1,484,204.96 0.00 10,576.68 15,600.00 89.92 172.24 7,394.55 7,324.45 -11,466.25 4,871.50 5,954,224.89 1,484,216.46 0.00 10,676.68 15,700.00 89.92 172.24 7,394.69 7,324.59 -11,565.33 -4,858.00 5,954,125.56 1,484,227.96 0.00 10,776.68 15,800.00 89.92 172.24 7,394.82 7,324.72 -11,664.42 4,844.51 5,954,026.23 1,484,239.46 0.00 10,876.67 15,900.00 89.92 172.24 7,394.96 7,324.86 -11,763.50 -4,831.01 5,953,926.91 1,484,250.96 0.00 10,976.67 16,000.00 89.92 172.24 7,395.09 7,324.99 -11,862.59 4,817.51 5,953,827.58 1,484,262.46 0.00 11,076.67 16,100.00 89.92 172.24 7,395.23 7,325.13 -11,961.67 4,804.01 5,953,728.25 1,484,273.96 0.00 11,176.67 16,200.00 89.92 172.24 7,395.36 7,325.26 -12,060.76 -4,790.52 5,953,628.92 1,484,285.46 0.00 11,276.67 16,300.00 89.92 172.24 7,395.50 7,325.40 -12,159.84 4,777.02 5,953,529.59 1,484,296.96 0.00 11,376.67 16,400.00 89.92 172.24 7,395.64 7,325.54 -12,258.93 4,763.52 5,953,430.26 1,484,308.46 0.00 11,476.67 16,500.00 89.92 172.24 7,395.77 7,325.67 -12,358.01 4,750.03 5,953,330.93 1,484,319.96 0.00 11,576.67 16,600.00 89.92 172.24 7,395.91 7,325.81 -12,457.10 4,736.53 5,953,231.60 1,484,331.46 0.00 11,676.67 16,700.00 89.92 172.24 7,396.04 7,325.94 -12,556.18 4,723.03 5,953,132.27 1,484,342.96 0.00 11,776.67 16,800.00 89.92 172.24 7,396.18 7,326.08 -12,655.27 4,709.53 5,953,032.94 1,484,354.46 0.00 11,876.67 16,900.00 89.92 172.24 7,396.31 7,326.21 -12,754.35 4,696.04 5,952,933.61 1,484,365.96 0.00 11,976.66 12!12016 2:17:53PM Page 7 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: CD5-314X Company: ConocoPhiliips(Alaska) Inc. -WNS TVD Reference: Plan: 33.8+36.3 @ 70.10usft (1319) Project: Western North Slope MD Reference: Plan: 33.8+36.3 @ 70.10usft (D19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-314X Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-314X Depth Inclination Design: CD5-314Xwp07 TVDss +N1 -S Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N1 -S +Ef-W Northing Easting DLS Vert Section (usft) (1) (1) (usft) usft (usft) (usft) (usft) (usft) 7,326.35 17,000.00 89.92 172.24 7,396.45 7,326.35 -12,853.44 -4,682.54 5,952,834.29 1,484,377.46 0.00 12,076.66 17,100.00 89.92 172.24 7,396.59 7,326.49 -12,952.52 -4,669.04 5,952,734.96 1,484,388.96 0.00 12,176.66 17,200.00 89.92 172.24 7,396.72 7,326.62 -13,051.61 -4,655.55 5,952,635.63 1,484,400.46 0.00 12,276.66 17,300.00 89.92 172.24 7,396.86 7,326.76 -13,150.69 -4,642.05 5,952,536.30 1,484,411.96 0.00 12,376.66 17,400.00 89.92 172.24 7,396.99 7,326.89 -13,249.77 -4,628.55 5,952,436.97 1,484,423.45 0.00 12,476.66 17,500.00 89.92 172.24 7,397.13 7,327.03 -13,348.86 -4,615.05 5,952,337.64 1,484,434.95 0.00 12,576.66 17,600.00 89.92 172.24 7,397.26 7,327.16 -13,447.94 -4,601.56 5,952,238.31 1,484,446.45 0.00 12,676.66 17,700.00 89.92 172.24 7,397.40 7,327.30 -13,547.03 -4,588.06 5,952,138.98 1,484,457.95 0.00 12,776.66 17,800.00 89.92 172.24 7,397.53 7,327.43 -13,646.11 -4,574.56 5,952,039.65 1,484,469.45 0.00 12,876.66 17,900.00 89.92 172.24 7,397.67 7,327.57 -13,745.20 -4,561.07 5,951,940.32 1,484,480.95 0.00 12,976.65 18,000.00 89.92 172.24 7,397.81 7,327.71 -13,844.28 -4,547.57 5,951,840.99 1,484,492.45 0.00 13,076.65 18,100.00 89.92 172.24 7,397.94 7,327.84 -13,943.37 -4,534.07 5,951,741.67 1,484,503.95 0.00 13,176.65 18,200.00 89.92 172.24 7,398.08 7,327.98 -14,042.45 -4,520.57 5,951,642.34 1,484,515.45 0.00 13,276.65 18,300.00 69.92 172.24 7,398.21 7,328.11 -14,141.54 -4,507.08 5,951,543.01 1,484,526.95 0.00 13,376.65 18,400.00 89.92 172.24 7,398.35 7,328.25 -14,240.62 -4,493.58 5,951,443.68 1,484,538.45 0.00 13,476.65 18,500.00 89.92 172.24 7,398.48 7,328.38 -14,339.71 -4,480.08 5,951,344.35 1,484,549.95 0.00 13,576.65 18,600.00 89.92 172.24 7,398.62 7,328.52 -14,438.79 -4,466.59 5,951,245.02 1,484,561.45 0.00 13,676.65 18,700.00 89.92 172.24 7,398.76 7,328.66 -14,537.88 -4,453.09 5,951,145.69 1,484,572.95 0.00 13,776.65 18,800.00 89.92 172.24 7,398.89 7,328.79 -14,636.96 4,439.59 5,951,046.36 1,484,584.45 0.00 13,876.65 18,900.00 89.92 172.24 7,399.03 7,328.93 -14,736.05 -4,426.09 5,950,947.03 1,484,595.95 0.00 13,976.64 19,000.00 89.92 172.24 7,399.16 7,329.06 -14,835.13 4,412.60 5,950,847.70 1,484,607.45 0.00 14,076.64 19,100.00 89.92 172.24 7,399.30 7,329.20 -14,934.22 4,399.10 5,950,748.38 1,484,618.95 0.00 14,176.64 19,200.00 89.92 172.24 7,399.43 7,329.33 -15,033.30 4,385.60 5,950,649.05 1,484,630.45 0.00 14,276.64 19,300.00 89.92 172.24 7,399.57 7,329.47 -15,132.39 4,372.11 5,950,549.72 1,484,641.95 0.00 14,376.64 19,400.00 89.92 172.24 7,399.70 7,329.60 -15,231.47 4,358.61 5,950,450.39 1,484,653.45 0.00 14,476.64 19,500.00 89.92 172.24 7,399.84 7,329.74 -15,330.56 4,345.11 5,950,351.06 1,484,664.94 0.00 14,576.64 19,600.00 89.92 172.24 7,399.98 7,329.88 -15,429.64 4,331.62 5,950,251.73 1,484,676.44 0.00 14,676.64 19,700.00 89.92 172.24 7,400.11 7,330.01 -15,528.73 -4,318.12 5,950,152.40 1,484,687.94 0.00 14,776.64 19,800.00 89.92 172.24 7,400.25 7,330.15 -15,627.81 -4,304.62 5,950,053.07 1,484,699.44 0.00 14,876.64 19,900.00 89.92 172.24 7,400.38 7,330.28 -15,726.90 4,291.12 5,949,953.74 1,484,710.94 0.00 14,976.63 20,000.00 89.92 172.24 7,400.52 7,330.42 -15,825.98 4,277.63 5,949,854.41 1,484,722.44 0.00 15,076.63 20,100.00 89.92 172.24 7,400.65 7,330.55 -15,925.07 -4,264.13 5,949,755.08 1,484,733.94 0.00 15,176.63 20,200.00 89.92 172.24 7,400.79 7,330.69 -16,024.15 -4,250.63 5,949,655.76 1,484,745.44 0.00 15,276.63 20,300.00 89.92 172.24 7,400.93 7,330.83 -16,123.24 4,237.14 5,949,556.43 1,484,756.94 0.00 15,376.63 20,400.00 89.92 172.24 7,401.06 7,330.96 -16,222.32 4,223.64 5,949,457.10 1,484,768.44 0.00 15,476.63 20,500.00 89.92 172.24 7,401.20 7,331.10 -16,321.41 4,210.14 5,949,357.77 1,484,779.94 0.00 15,576.63 20,600.00 89.92 172.24 7,401.33 7,331.23 -16,420.49 -4,196.64 5,949,258.44 1,484,791.44 0.00 15,676.63 20,700.00 89.92 172.24 7,401.47 7,331.37 -16,519.58 4,183.15 5,949,159.11 1,484,802.94 0.00 15,776.63 20,800.00 89.92 172.24 7,401.60 7,331.50 -16,618.66 4,169.65 5,949,059.78 1,464,814.44 0.00 15,876.63 20,900.00 89.92 172.24 7,401.74 7,331.64 -16,717.75 4,156.15 5,948,960.45 1,484,825.94 0.00 15,976.62 21,000.00 89.92 172.24 7,401.87 7,331.77 -16,816.83 4,142.66 5,948,861.12 1,484,837.44 0.00 16,076.62 21,100.00 89.92 172.24 7,402.01 7,331.91 -16,915.91 4,129.16 5,948,761.79 1,484,848.94 0.00 16,176.62 21,200.00 89.92 172.24 7,402.15 7,332.05 -17,015.00 -4,115.66 5,948,662.47 1,484,860.44 0.00 16,276.62 21,300.00 89.92 172.24 7,402.28 7,332.18 -17,114.08 4,102.16 5,948,563.14 1,484,871.94 0.00 16,376.62 21,400.00 89.92 172.24 7,402.42 7,332.32 -17,213.17 4,088.67 5,948,463.81 1,484,883.44 0.00 16,476.62 12!72016 2:17:53PM Page 8 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: CD5314X Company: ConocoPhiilips(Alaske) Inc. -WNS TVD Reference: Plan: 33.8+36.3 @ 70.10usft (D19) Project: Western North Slope MD Reference: Plan: 33.8+36.3 @ 70.10usft (D19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-314X Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5314X Depth Inclination Design: CD5314Xwp07 TVDs9 +W -S Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDs9 +W -S +E! -W Northing Easting DLS Vert Section (usft) 0 (1) (usft) usft (usft) (usft) (usft) (usft) 7,332.45 21,500.00 89.92 172.24 7,402.55 7,332.45 -17,312.25 4,075.17 5,948,364.48 1,484,894.93 0.00 16,576.62 21,600.00 89.92 172.24 7,402.69 7,332.59 -17,411.34 -4,061.67 5,948,265.15 1,484,906.43 0.00 16,676.62 21,700.00 89.92 172.24 7,402.82 7,332.72 -17,510.42 4,048.18 5,948,165.82 1,484,917.93 0.00 16,776.62 21,800.00 89.92 172.24 7,402.96 7,332.86 -17,609.51 4,034.68 5,948,066.49 1,484,929.43 0.00 16,876.62 21,900.00 89.92 172.24 7,403.10 7,333.00 -17,708.59 4,021.18 5,947,967.16 1,484,940.93 0.00 16,976.61 22,000.00 89.92 172.24 7,403.23 7,333.13 -17,807.68 4,007.68 5,947,867.83 1,484,952.43 0.00 17,076.61 22,100.00 89.92 172.24 7,403.37 7,333.27 -17,906.76 3,994.19 5,947,768.50 1,484,963.93 0.00 17,176.61 22,200.00 89.92 172.24 7,403.50 7,333.40 -18,005.85 -3,980.69 5,947,669.17 1,484,975.43 0.00 17,276.61 22,300.00 89.92 172.24 7,403.64 7,333.54 -18,104.93 -3,967.19 5,947,569.85 1,484,986.93 0.00 17,376.61 22,400.00 89.92 172.24 7,403.77 7,333.67 -18,204.02 -3,953.70 5,947,470.52 1,484,998.43 0.00 17,476.61 22,500.00 89.92 172.24 7,403.91 7,333.81 -18,303.10 -3,940.20 5,947,371.19 1,485,009.93 0.00 17,576.61 22,600.00 89.92 172.24 7,404.05 7,333.95 -18,402.19 -3.926.70 5,947,271.86 1,485,021.43 0.00 17,676.61 22,700.00 89.92 172.24 7,404.18 7,334.08 -18,501.27 -3,913.20 5,947,172.53 1,485,032.93 0.00 17,776.61 22,800.00 89.92 172.24 7,404.32 7,334.22 -18,600.36 -3,899.71 5,947,073.20 1,485,044.43 0.00 17,876.61 22,900.00 89.92 172.24 7,404.45 7,334.35 -18,699.44 -3,886.21 5,946,973.87 1,485,055.93 0.00 17,976.60 23,000.00 89.92 172.24 7,404.59 7,334.49 -18,798.53 -3,872.71 5,946,874.54 1,485,067.43 0.00 18,076.60 23,100.00 89.92 172.24 7,404.72 7,334.62 -18,897.61 -3,859.22 5,946,775.21 1,485,078.93 0.00 18,176.60 23,200.00 89.92 172.24 7,404.86 7,334.76 -18,996.70 -3,845.72 5,946,675.88 1,485,090.43 0.00 18,276.60 23,300.00 89.92 172.24 7,404.99 7,334.89 -19,095.78 -3,832.22 5,946,576.55 1,485,101.93 0.00 18,376.60 23,400.00 89.92 172.24 7,405.13 7,335.03 -19,194.87 -3,818.73 5,946,477.23 1,485,113.43 0.00 18,476.60 23,500.00 89.92 172.24 7,405.27 7,335.17 -19,293.95 -3,805.23 5,946,377.90 1,485,124.92 0.00 18,576.60 23,600.00 89.92 172.24 7,405.40 7,335.30 -19,393.04 -3,791.73 5,946,278.57 1,485,136.42 0.00 18,676.60 23,700.00 89.92 172.24 7,405.54 7,335.44 -19,492.12 -3,778.23 5,946,179.24 1,485,147.92 0.00 18,776.60 23,800.00 89.92 172.24 7,405.67 7,335.57 -19,591.21 3,764.74 5,946,079.91 1,485,159.42 0.00 18,876.60 23,900.00 89.92 172.24 7,405.81 7,335.71 -19,690.29 -3,751.24 5,945,980.58 1,485,170.92 0.00 18,976.59 24,000.00 89.92 172.24 7,405.94 7,335.84 -19,789.38 3,737.74 5,945,881.25 1,485,182.42 0.00 19,076.59 24,100.00 89.92 172.24 7,406.08 7,335.98 -19,888.46 -3,724.25 5,945,781.92 1,485,193.92 0.00 19,176.59 24,200.00 89.92 172.24 7,406.22 7,336.12 -19,987.55 -3,710.75 5,945,682.59 1,485,205.42 0.00 19,276.59 24,300.00 89.92 172.24 7,406.35 7,336.25 -20,086.63 -3,697.25 5,945,583.26 1,485,216.92 0.00 19,376.59 24,400.00 89.92 172.24 7,406.49 7,336.39 -20,185.72 -3,683.75 5,945,483.94 1,485,228.42 0.00 19,476.59 24,500.00 89.92 172.24 7,406.62 7,336.52 -20,284.80 -3,670.26 5,945,384.61 1,485,239.92 0.00 19,576.59 24,600.00 89.92 172.24 7,406.76 7,336.66 -20,383.88 -3,656.76 5,945,285.28 1,485,251.42 0.00 19,676.59 24,700.00 89.92 172.24 7,406.89 7,336.79 -20,482.97 -3,643.26 5,945,185.95 1,485,262.92 0.00 19,776.59 24,800.00 89.92 172.24 7,407.03 7,336.93 -20,582.05 -3,629.77 5,945,086.62 1,485,274.42 0.00 19,876.59 24,900.00 89.92 172.24 7,407.16 7,337.06 -20,681.14 -3,616.27 5,944,987.29 1,485,285.92 0.00 19,976.58 25,000.00 89.92 172.24 7,407.30 7,337.20 -20,780.22 -3,602.77 5,944,887.96 1,485,297.42 0.00 20,076.58 25,100.00 89.92 172.24 7,407.44 7,337.34 -20,879.31 -3,589.27 5,944,788.63 1,485,308.92 0.00 20,176.58 25,200.00 89.92 172.24 7,407.57 7,337.47 -20,978.39 -3,575.78 5,944,689.30 1,485,320.42 0.00 20,276.58 25,300.00 89.92 172.24 7,407.71 7,337.61 -21,077.48 -3,562.28 5,944,589.97 1,485,331.92 0.00 20,376.58 25,400.00 89.92 172.24 7,407.84 7,337.74 -21,176.56 -3,548.78 5,944,490.64 1,485,343.42 0.00 20,476.58 25,500.00 89.92 172.24 7,407.98 7,337.88 -21,275.65 -3,535.29 5,944,391.32 1,485,354.91 0.00 20,576.58 25,600.00 89.92 172.24 7,408.11 7,338.01 -21,374.73 -3,521.79 5,944,291.99 1,485,366.41 0.00 20,676.58 25,700.00 89.92 172.24 7,408.25 7,338.15 -21,473.82 -3,508.29 5,944,192.66 1,485,377.91 0.00 20,776.58 25,800.00 89.92 172.24 7,408.39 7,338.29 -21,572.90 -3,494.79 5,944,093.33 1,485,389.41 0.00 20,876.58 25,900.00 89.92 172.24 7,408.52 7,338.42 -21,671.99 -3,481.30 5,943,994.00 1,485,400.91 0.00 20,976.57 12/72016 2:17:53PM Page 9 COMPASS 5000.1 Build 74 Database: I OAKEDMP2 Company: ConocoPhillips(Alaska) Inc.-WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-314X Wellbore: Plan: CD5.314X Design: CD5-314XWp07 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well Plan: CD5.314X Plan: 33.8+36.3 Q 70.10usft (1319) Plan: 33.8+36.3 @ 70.10usft (D19) True Minimum Curvature Planned Survey Target Name Measured Vertical -hitimiss target Dip Angle Dip Dir. TVD +N/_S +PJ -W Northing Measured - Shape (") (") (usft) (usft) (usft) Vertical (usft) CD5-314X 01.Heel 052516 DK 0.00 0.00 7,388.10 -10,698.25 4,965.93 Map Map - plan misses target center by 11.44usft at 14826.27usft MD (7393.50 TVD, -10699.60 N, -4975.93 E) 115.90 Depth Inclination Azimuth Depth TVDss +NIS +EI -W Northing Easting DLS Vert Section (usft) (") (0) (usft) usft (usft) (usft) (usft) (usft) 7,338.56 1,484,096.48 26,000.00 89.92 172.24 7,408.66 7,338.56 -21,771.07 -3,467.80 5,943,894.67 1,485,412.41 0.00 21,076.57 26,100.00 89.92 172.24 7,408.79 7,338.69 -21,870.16 -3,454.30 5,943,795.34 1,485,423.91 0.00 21,176.57 26,200.00 89.92 172.24 7,408.93 7,338.83 -21,969.24 -3,440.81 5,943,696.01 1,485,435.41 0.00 21,276.57 26,300.00 89.92 172.24 7,409.06 7,338.96 -22,068.33 -3,427.31 5,943,596.68 1,485,446.91 0.00 21,376.57 26,326.86 89.92 172.24 7,409.10 7,339.00 -22,094.94 -3,423.68 5,943,570.00 1,485,450.00 0.00 21,403.43 TD: 26326.86' MD, 7409.1' TVD .4-1/2" x 6-314" CD5-314X 02.Toe 020816 DK 0.00 0.00 7,430.10 -21,984.52 -9,367.55 5,943,800.00 1,479,510.00 - plan misses target center by 5874.61 usft at 25415.23usft MD (7407.86 TVD, -21191.65 N, -3546.73 E) Targets Target Name Measured Vertical -hitimiss target Dip Angle Dip Dir. TVD +N/_S +PJ -W Northing Pasting - Shape (") (") (usft) (usft) (usft) (usft) (usft) CD5-314X 01.Heel 052516 DK 0.00 0.00 7,388.10 -10,698.25 4,965.93 5,954,994.58 1,484,137.51 - plan misses target center by 11.44usft at 14826.27usft MD (7393.50 TVD, -10699.60 N, -4975.93 E) 115.90 20"x42" 20 - Circle (radius 100.00) 2,464.26 2,185.10 10 -314"x13 -1r2" CD5-314X 01.Heel 020816 DK 0.00 0.00 7,351.10 -13,025.40 -10,528.15 5,952,780.00 1,478,530.00 - plan misses target center by 5815.50usft at 16381.34usft MD (7395.61 TVD, -12240.44 N, 4766.04 E) 7-5/8 11 26,326.86 -Circle (radius 100.00) 4-112"x6-3/4" 4-1/2 6-3/4 CD5-314X 00.1-Kalubik 052516 DK 0.00 0.00 7,355.10 -10,229.29 -5,016.41 5,955,464.42 1,484,096.48 - plan misses target center by 41.99usft at 14352.91 usft MD (7389.95 TVD, -10230.63 N, -5039.81 E) - Circle (radius 100.00) C05 -314X 02.Toe 040416 NA 0.00 0.00 7,409.10 -22,094.94 -3,423.68 5,943,570.00 1,485,450.00 - plan hits target center - Circle (radius 100.00) CD5-314X 01.Heel 022316 DK 0.00 0.00 7,351.10 -12,033.61 -10,656.64 5,953,774.10 1,478,421.51 - plan misses target center by 5808.94usft at 15381.29usft MD (7394.25 TVD, -11249.53 N. -4901.02 E) - Circle (radius 100.00) CD5-314X 01.Heel 040416 NA 0.00 0.00 7,388.10 -10,204.25 -5,043.41 5,955,490.00 1,484,070.00 - plan hits target center - Circle (radius 100.00) CD5-314X 02.Toe 022316 DK 0.00 0.00 7,430.10 -20,992.73 -9,496.03 5,944,794.10 1,479,401.51 - plan misses target center by 5868.06usft at 24415.18usft MD (7406.51 TVD, -20200.75 N. -3681.71 E) - Circle (radius 100.00) CD5-314X 02.Toe 020816 DK 0.00 0.00 7,430.10 -21,984.52 -9,367.55 5,943,800.00 1,479,510.00 - plan misses target center by 5874.61 usft at 25415.23usft MD (7407.86 TVD, -21191.65 N, -3546.73 E) - Circle (radius 100.00) Casing Points Measured Vertical Casing Hale Depth Depth Diameter Diameter (usft) (usft) Name (") (") 115.90 115.90 20"x42" 20 42 2,464.26 2,185.10 10 -314"x13 -1r2" 10-3/4 13-112 14,326.22 7,388.10 7-518" x 9-7/8" by 11" 7-5/8 11 26,326.86 7,409.10 4-112"x6-3/4" 4-1/2 6-3/4 12/72016 2:17:53PM Page 10 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: CD5-314X Company: ConocoPhiilips(Alasks) Inc. -WNS TVD Reference: Plan: 33.8+36.3 Q 70.10usft (D19) Project: Western North Slope MD Reference: Plan: 33.8+36.3 @ 70.10usft (D79) Site: CD5 Alpine West Pad North Reference: True Well; Plan: CD5-314X Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-314X Kupawk C KOP: Start 1.5"/100' DLS, 190° TF, for 250.18' Design: CD5-314Xwp07 K-3 -1.42 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (usft) (usft) Name Lithology 14,395.88 7,392.10 LCU 349.60 14,286.76 7,385.10 Kupawk C KOP: Start 1.5"/100' DLS, 190° TF, for 250.18' 5,827.16 3,738.10 K-3 -1.42 7,358.89 4,442.10 Sub97 -150.88 9,377.99 5,370.10 Albian 96 1,370.10 3,855.93 2,832.10 C-10 2,464.26 13,013.52 7,040.10 HRZ Hold for 20' 6,366.75 3,986.10 K-2 -322.12 2,685.38 2,294.10 C-30 -919.87 13,650.62 7,270.10 HRZ Base 6,998.31 7,117.38 4,331.10 Albian 97 14,326.34 1,342.31 1,320.10 Base Permafrost Hold for 20' Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +EI -W (usft) (usft) lush) (usft) Comment 349.60 349.60 0.00 0.00 KOP: Start 1.5"/100' DLS, 190° TF, for 250.18' 599.78 599.60 -8.07 -1.42 Start 2.5°/100' DLS, 5' TF, for 688.99' 1,288.77 1,270.10 -150.88 35.70 Hold for 107.09' 1,395.86 1,370.10 -188.03 -45.06 Start 3.5°/100' DLS, 19.7° TF, for 1068.4' 2,464.26 2,185.10 -792.10 -314.15 Hold for 20' 2,484.26 2,195.85 -806.97 -322.12 Start 3.5°/100' DLS, 8.83° TF, for 148.47- 2,632.75 2,269.91 -919.87 -383.79 Hold for 10287.72' 12,920.57 6,998.31 -8,904.83 4,824.71 Start 3°/100' DLS,-62.98`TF, for 1405.7T 14,326.34 7,388.11 -10,204.38 -5,043.39 Hold for 20' 14,346.34 7,389.50 -10,224.14 -5,040.70 Start 4°/100' DLS, 0° TF, for 98.06' 14,444.40 7,392.98 -10,321.22 5,027.47 Hold for 11882.59' 26,326.86 7,409.10 -22,094.94 3,423.68 TD: 26326.86' MD, 7409.1' TVD 12!72016 2:17:53PM Page 11 COMPASS 5000.1 Build 74 AC Report ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CDS-314X Plan: CD5-314X 50103xxxxx00 CD5-314Xwp07 Failed Anti -Collision Clearance Summary Anticollision Report 07 December, 2016 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CDS Alpine West Pad - Plan: CDS.314X-Plan: CDS-314X-CD5-314XWP07 Well Coordinates: 5,965,689.94 N, 1,489,317.35 E (70° 18' 48.40" N, 161° 13'28.78" W) Datum Height: Plan: 33.8+36.3 0 70.10usft (D19) Scan Range: 0.00 to 26,326.86 "ft. Measured Depth. Scan Radius is 2,829.06 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Geodetic Scale Factor Applied Version: 6000.1 Build: 74 Scan Type: GLOBAL FILTER APPLIED: All wellpaths wiihin 200'+ 100/1000 of reference Scan Type: 25.00 Anticollision Report for Plan: CD5-314X - CD5-314Xwp07 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Plan: CDS-314X - Plan: CD5314X - CD5314Xwp07 Scan Range: 0.00 to 26,326.86 usft. Measured Depth. Scan Radius is 2,829.06 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Site Name Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Comparison Well Name- Wellbore Name -Design Depth (usft) Distance (usft) Depth Separation Depth Factor Minimum Separation Warning (usft) (usft) usft CD5 Alpine West Pad CD5-02 - CD5-02 - CD5-02 49.19 245.11 49.19 242.35 50.00 88.764 Centre Distance Pass - Major Risk CD5-02 - CD5-02 - CD5-02 397.75 245.65 397.75 238.68 400.00 35.231 Clearance Factor Pass - Major Risk CD5-02 - CD5-02A - CD5-02A 49.19 245.11 49.19 242.74 50.00 103.163 Centre Distance Pass - Major Risk CD5-02-CD5-02A-CD5-02A 397.75 245.65 397.75 238.68 400.00 35.231 Clearance Factor Pass - Major Risk CD5-03 - CD5-03 - CD5-03 373.54 224.60 373.54 218.13 375.00 34.686 Centre Distance Pass - Major Risk CD5-03 - CD5-03 - CD5-03 470.89 225.09 470.89 217.34 475.00 29.059 Clearance Factor Pass - Major Risk CD5-04 - CD5-04 - CD5-04 373.38 204.04 373.38 197.56 375.00 31.478 Centre Distance Pass - Major Risk CD5-04 - CD5-04 - CD5-04 471.00 204.73 471.00 196.90 475.00 26.143 Clearance Factor Pass - Major Risk CD5-05 - CD5-05 - CDS-05 274.10 184.74 274.10 179.78 275.00 37.220 Centre Distance Pass - Major Risk CD5-05 - CD5-05 - CD5-05 398.02 185.50 398.02 178.51 400.00 26.540 Clearance Factor Pass - Major Risk CD5-06 - CD5-06 - CDS-06 299.29 163.38 299.29 158.07 300.00 30.771 Centre Distance Pass - Major Risk CD5-06 - CD5-06 - CD5-06 373.78 163.98 373.78 157.53 375.00 25.430 Clearance Factor Pass - Major Risk CD5-06-CD5-0611-CD5-061.1 299.29 163.38 299.29 158.07 300.00 30.771 Centre Distance Pass - Major Risk CD5-06 - CD5-0611 - CD5-0611 373.78 163.98 373.78 157.53 375.00 25.430 Clearance Factor Pass - Major Risk CD5-07 - CD5-07 - CD5-07 49.13 145.13 49.13 142.37 50.00 52.565 Centre Distance Pass - Major Risk CD5-07 - CD5-07 - CD5-07 422.80 147.09 422.80 139.79 425.00 20.153 Clearance Factor Pass - Major Risk CD5-08 - CD5-08 - CD5-08 374.26 123.94 374.26 117.42 375.00 19.032 Centre Distance Pass - Major Risk CD5-08 - CD5-08 - CD5-08 472.78 124.48 472.78 116.66 475.00 15.915 Clearance Factor Pass - Major Risk CD5-09 - CD5-09 - CD5-09 49.21 105.09 49.21 102.32 50.00 38.049 Centre Distance Pass - Major Risk CD5-09 - CD5-09 - CD5-09 398.40 106.27 398.40 99.29 400.00 15.220 Clearance Factor Pass - Major Risk CD5-1 0 - CD5-1 0 - CD5-1 0 324.40 84.96 324.40 79.42 325.00 15.320 Centre Distance Pass - Major Risk CD5-10 - CD5-10 - CD5-10 547.25 86.40 547.25 77.59 550.00 9.805 Clearance Factor Pass - Major Risk CD5-11 - CD5-11 - CD5-11 274.50 64.58 274.50 59.73 275.00 13.313 Centre Distance Pass - Major Risk CD5-11 - CD5-11 - CD5-11 448.75 65.60 448.75 58.06 450.00 8.696 Clearance Factor Pass - Major Risk CD5-12 - CD5-12 - CD5-12 249.89 44.50 249.89 40.04 250.00 9.977 Centre Distance Pass - Major Risk CDS-12 - CDS-12 - CD5-12 449.39 45.29 449.39 37.70 450.00 5.964 Clearance Factor Pass - Major Risk CD5-21 - CD5-21 - CD5-21 864.22 126.94 864.22 113.53 850.00 9.462 Clearance Factor Pass - Major Risk CD5-313 - CD5-313 - CD5-313 324.40 24.86 324.40 19.45 325.00 4.598 Centre Distance Pass - Major Risk 07 December, 2016 - 14:15 Page 2 of 6 COMPASS Anticollision Report for Plan: CD5-314X - CD5-314Xwp07 Ira v. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Plan: CD5-314X-Plan: CD5J14X-CD5-314Xwp07 Scan Range: 0.00 to 26,326.86 usft. Measured Depth. Scan Radius is 2,829.06 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Site Name Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Comparison Well Name - Wellbore Name - Design Depth lusft Distance (usft) Depth Separation Depth Factor Minimum Separation Warning (usft) (usft) usft CD5-313-CDS-313-CD5-313 648.25 26.57 648.25 16.31 649.95 2.590 Clearance Factor Pass - Major Risk CD5-313-CD5.313PB1-CD5.313PB1 324.40 24.86 324.40 19.45 325.00 4.598 Centre Distance Pass - Major Risk CDS-313 - CD5-313PB1 - CD5-313PB1 648.25 26.57 648.25 16.31 649.95 2.590 Clearance Factor Pass -Major Risk CD5-314-CDS-314-CD5-314 49.21 5.18 49.21 2.42 50.00 1.876 Centre Distance Pass -Major Risk C05-314-CD5.314-CD5-314 11111111111111cs a -__ , 1 .....,.... CD5.315-CD5.315-CD5-315 499.33 12.15 499.33 3.84 500.00 1.462 Centre Distance Pass - Major Risk CD5-315-CD5-315-CD5-315 524.33 12.32 524.33 3.67 525.00 1.424 Clearance Factor Pass - Major Risk CD5-315 - CD5-315PB1 - CD5-315PB1 499.33 12.15 499.33 3.B4 500.00 1.462 Centre Distance Pass - Major Risk CD5-315-CD5-315PB1-CD5-315PB1 524.33 12.32 524.33 3.67 525.00 1.424 Clearance Factor Pass - Major Risk Pian: CD5-17 (6D) - Plan: CDS-17 - CD5-17wp06 (6D) 725.20 48.97 725.20 36.79 725.00 4.023 Clearance Factor Pass - Major Risk Plan: CD5.17 (6D) - Plan: CD5-171-1 - CD5-17Liwp06 725.20 48.97 725.20 36.79 725.00 4.023 Clearance Factor Plan: CDS-19 (8D, formerly 7D) - Plan: CD5-19 - CD5- 1,127.40 77.04 1,127.40 58.98 1,125.00 Pass - Major Risk Plan: CD5-19 (8D, formerly 7D) - Pian: CD5-19 - CD5- 1,200.79 77.64 1,200.79 4.265 Centre Distance Pass - Major Risk Plan: CDS-19 (80, formerly 7D) - Plan: CD5-19L1 - CD 1,127.40 77.04 58.35 1,200.00 4.025 Clearance Factor Pass - Major Risk Plan: CD5.19 (8D, formerly 7D) - Plan: CD5-191-1 - CD 1,200.79 1,127.40 58.98 1,125.00 4.265 Centre Distance Pass - Major Risk 77.64 1,200.79 58.35 1,200.00 4.025 Clearance Factor Pass - Major Risk Plan: CD5-20 - Plan: CD5-20 - CD5-20wp04 703.26 111.26 703.26 99.48 700.00 9.448 Centre Distance Plan: CD5.20 - Plan: CD5-20 - CD5.20wpD4 728.05 111.43 728.05 99.23 Pass - Major Risk Plan: CDS-20 - Plan: CD5-20L1 - CD&20LlwpO4 703.26 111.26 725.00 9.132 Clearance Factor Pass - Major Risk Plan: CD5-20 - Pian: CD5.201-1 - CD5-20LtwpO4 728.05 703.26 99.48 700.00 9.448 Centre Distance Pass - Major Risk Plan: CD5.22-Plan: CD5-22-CD5.22wp01 111.43 728.05 99.23 725.00 9.132 Clearance Factor Pass - Major Risk _ Plan: CD5-22 - Plan: CD5.22 - CD5-22wp01 756.28 149.32 756.28 136.68 750.00 11.807 Centre Distance Pass -Major Risk 805.95 149.75 805.95 136.26 800.DO 11.098 Clearance Factor Pass - Major Risk Plan: CD5-316 - Plan: CD5-316 - CD5-316wp03 524.96 34.24 524.96 25.55 525.00 3.939 Centre Distance Pass - Major Risk Plan: CD5-316 - Plan: CD5-316 - CD5.316wpO3 725.95 35.60 725.95 24.03 725.00 3.078 Clearance Factor Pass - Major Risk Plan: CD5.316-Plan: C05-316PB1-CD5-316PBiwpO 524.96 34.24 524.96 25.55 525.00 Plan: CD5-316 - Plan: CD5-316P81 - CD5-316PB1wpO 725.95 35.60 725.95 3.939 Centre Distance Pass - Major Risk Rig: CD5-18 (7D) - Plan: CD5-181-1 - CD5-18L1wp06 ( 1,310.75 24.03 725.00 3.078 Clearance Factor Pass - Major Risk Rig: CD5-18 (7D) - Plan: CD5-181-1 - CD5.18L1wp06 ( 1,335.46 34.58 1,310.75 13.85 1,300.00 1.668 Centre Distance Pass - Major Risk 34.79 1,335.46 13.77 1,325.00 1.655 Clearance Factor Pass - Major Risk Rig: CD5-18 (7D) - Rig: C05.18 - CD5-18wpO6 (7D) 1,310.75 34.58 1,310.75 13.38 1,300.00 1.631 Centre Distance Pass - Major Risk Rig: CD5-18 (7D) - Rig: CD5.18-CD5.18wp06(7D) 1,335.46 34.79 1,335.46 13.36 1,325.00 1.623 Clearance Factor Pass - Major Risk Rig: CD5-18 (7D) - Rig: C05.18 - Rig: C05.18 1,317.96 57.68 1,317.96 36.95 1,300.00 2.783 Centre Distance Pass - Major Risk 07 December, 2016 - 14:15 Page 3 of 6 COMPASS Anticollision Report for Plan: CD5-314X - CD5-314XwpO7 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Plan: CD5.314X - Plan: CD5314X - CD5314Xwp07 Scan Range: 0.00 to 26,326.86 usft. Measured Depth. Scan Radius is 2,829.06 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Site Name Comparison Well Name - Wellbore Name - Design Rig: CD5-18 (7D) - Rig: CD5-18 - Rig: CD5-18 Survey fool orograut Measured Minimum @Measured Depth Distance Depth (usft) (usft) (usft) 1,342.56 57.90 1,342.56 Ellipse Separation (usft) 36.70 @Measured Clearance Summary Based on Depth Factor Minimum usft 1,325.00 2.731 Clearance Factor From To SurveyfPlan Survey Tool (usft) (usft) 36.30 1,700.00 CD5-314Xwp07 GYD-GC-SS 1,700.00 2,464.26 CD5-314Xwp07 MWD 1,700.00 2,464.26 CD5-314Xwp07 MWD+IFR-AK-CAZ-SC 2,464.26 3,964.26 CD5-314Xwp07 MWD 2,464.26 14,326.22 CD5-314Xwp07 MWD+IFR-AK-CAZ-SC 14,326.22 15,826.22 CD5-314Xwp07 MWD 14,326.22 26,326.86 CD5-314Xwp07 MWD+IFR-AK-CAZ-SC Ellipse error terms are correlated across survey tool tie -on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. Separation Warning Pass - Major Risk 07 December, 2016 - 14:15 Page 4 of 6 COMPASS Ladder View Eq,meianl Mnne Diz — M Ladder View 14:27. Dx r 07 CD 5 -3 1 4Xwp0 7 The Reference Well is along the X-axis. Error Ellipses are the Sum of the Reference and Offset Well Errors. a ss R9. "s s" 300 C J —.._:.+I 1 IIS III III III I III I I III „fill III 03 d 1 V �I N 150 I ) N U I D Equipe May-yc NM w 2000 4000 6000 8000 10000 1200 Displayed interval could be less than entire well:Measured Depth 36.30 To 26326.86 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool TVD MD Name 36.30 1700.00 CD5-314Xwp07 (Plan: CD5-314X)GYD-GC-SS 115.90 115.90 20" x 42" 1700.00 2464.26 CD5-314Xwp07 (Plan: CD5-314X)MWD 2185.1D36426 10-3/4" x 13-1/2" 1700.00 2464.26 CD5-314Xwp07 (Plan: CD5-314X)MWD+IFR-AK-CAZ-SC 7388114826722/8" x 9-7/8" by 11" 2464.26 3964.26 CD5-314XwpO7 (Plan: CD5-314X)MWD 740926826.86 4-1/2" x 6-3/4" 2464.2614326.22 CD5-314XwpO7 (Plan: CD5-314X)MWD+IFR-AK-CAZ-SC 14326.2215826.22 CD5-314Xwp07 (Plan: CD5-314X)MWD 14326.2226326.86 CD5-314XwpO7 (Plan: CD5-314X)MWD+IFR-AK-CAZ-SC s a a so— LlIllng4l J. c 0 m m O m N d a 30 U 0 d ) U 0 0 500 1000 1500 2000 2500 3000 3500 Partial Measured Depth Eq,meianl Mnne Diz — M TC View AC Wells Only December 07 201 AC wells ONLY (NOT a $eider) CD5 Easting (6000 Easting (6000 ustUin) C0D5-170DOOPMD) 'NO CD4 Nanuq Pad C AC Flipbook Casing Details survey Program 16 CDs-314Xwpo7 Depth From 36.30 +)66.6D Depth To Su,FeyCD5-31/Plan 2)60.00 CDS-314Xwyox(Plan: C 296436 CDY3+4%wp6l (Plan: CDS'329X) IDol 55 350 530 ND MD oName ++5.90 n5.90 z "x qzo ne5.m 2464.x6 )388.+0 2q}x6.12 263/4"xp-2/x" 2-5/8"x99/8"by n" 966.66 ,no) x464.26 CD531 % P07 (Plan: CDS9+4%) MWD AAVVD MWDAFR-F -Sc 1700.00 To 26326 86 • )409.26 263x6.96 4.2R"x63/4" x469.26 x969.,6 +4366.x, 3964.x6 CDS Po%(Plan: CD594)0 +43x6.22 CD5'329%wPn7(Man:CD59+4%) CD5314 Pol(PIam MWD MWD.IFR WA- 530 710 +4326.x1 148x632 CD59+4%) x63,6.86 CDp3+4% 6I Plan: - y% MWD MNq.IF0.AK-UZ.SC 710 890 MD Azi 0/360 36.30 0.00 896 1070 349.60 o.00 -30/33 0 599.78 19o.o0� �� �� 1070 1240 1288.77 194.14�,"- 1240 1420 1395.86 194.14 F 60 1420 1600 2464.26 208.18 2484.26 208.18 -6o/300,,���� 6o 1600 2630 2632.73 209.08 2630 3650 12920-45 209.08 -� 30 3650 4680 14326.22 172.24 14346.22 172.24 ��' .... „ 468o 5700 14444.27 172.24 0 / 2]0 5700 6730 26326.86 172.24 go 6730 7750 -" 7750 8780 / 30 8780 9800 9800 11870 -120/240 120 11870 13930 6o 13930 16000 16000 18o6o -150/210 150 18060 20130 go -18o/18o 20130 22200 14:34, December 07 2016 22200 2426o ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CD5-314X Plan: CD5-314X Plan: CD5-314Xwp07 Report 07 December. 2016 Report Company: Con000Phillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well Plan: CD5314X Project Western North Slope TVD Reference: Plan: 33.8+36.3 ® 70.10usft (019) Site: CD5 Alpine West Pad MD Reference: Plan: 33.8+38.3 @ 70.10usft (Dl 9) Well: Plan: CD5314X North Reference: True Wellbore: Plan: CDS-314X Survey Calculation Method: Minimum Curvature Design: CD5-314Xwp07 Database: OAKEDMP2 Project Western North Slope, North Slope Alaska, United States Ground Level: Map System: 0.00 System Datum: Mean Sea Level Geo Datum: MWD -Standard Using Well Reference Point Map Zone: 2,464.26 CD5-314Xwp07 (Plan: CD5-314X) Using geodetic scale factor MWD -IFR AK CAZ SCC 2,464.26 She C05 Alpine West Pad MWD MWD -Standard Site Position: Northing: Latitude: 14,326.22 CD5-314Xwp07(Plan: CD5314X) From: Map Easting: Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13-3116" Grid Convergence: -1.15 ° Well Plan: CD5314X - Audit Notes: Well Position +N/S 0.00 usft Northing: 5,965,589.94 usft Latitude: 70° 18'48.400 N 36.30 +E/4N 0.00 usft Easting: 1,489,317.35 usft Longitude: 151 ° 13'28.777 W Position Uncertainty (usft) 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 33.80 usft Wellbore Plan: CD5314X _ Magneties Abdel Name Sample Date Declination Dip Angle Field Strength (nT) BGGM2016 _ 711512017. 17.06 80.80 57,502 Design CD5314Xwp07 - Audit Notes: From To Version: Phase: PLAN Tie On Depth: 36.30 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usR) (usft) fusit) (°) Gyrodata gyro single shots 36.30 0.00 0.00 172.00 Survey Teol Program Date 12/7/2016 - From To (usm (usR) Survey (INeRbon) Tool Name Description 36.30 1,700.00 CD5-314XWP07 (Plan: CD5-314X) GVD-GC-SS Gyrodata gyro single shots 1,700.00 2,464.26 CD5314XWP07(Plan: CDS-314X) MWD MWD -Standard 1,700.00 2,464.26 CD5-314Xwp07 (Plan: CD5-314X) MWD+IFR-AK-CAZSC MWD -IFR AK CAZ SCC 2,464.26 3,964.28 CD5314Xwp07(Plan: CDS-314X) MWD MWD -Standard 2,464.26 14,326.22 CD5-314Xwp07(Plan: CD5314X) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 14,32622 15,826.22 C05-314XWP07(Plan: CD5-314X) MWD MWD -Standard 14,326.22 26,326.86 CD5.314XWp07(Plan: CD5314X) MWD+IFR-AK-CAZSC MWD+IFR AK CAZ SCC Planned Survey MD Inc Azi (azimuth) TVD TVDSS DLeg TFace LVL Emyr (usft) V) (°) (udq (usR) (°11100uaR) CI (usft) 36.30 0.00 0.00 36.30 -33.80 0.00 0.00 0.00 100.00 0.00 0.00 100.00 29.90 0.00 0.00 0.05 115.90 0.00 0.00 115.90 45.80 0.00 0.00 0.19 20" x 42" 200.00 0.00 0.00 200.00 129.90 0.00 0.00 0.19 300.00 0.00 0.00 300.00 229.90 0.00 0.00 0.34 12/72016 2:19:01PM Page 2 COMPASS 5000.1 Build 74 Report Company: Con000Phillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well Plan: CDS-314X Project: Western North Slope TVD Reference: Plan: 33.8+36.3 @ 70.10usft (D19) Site: CDS Alpine West Pad MD Reference: Plan: 33.8+36.3 @ 70.10usft (D19) Well: Plan: CDS-314X North Reference: True Wellbore: Plan: CD5-314X Survey Calculation Method: Minimum Curvature Design: CD5314Xwp07 Database: OAKEDMP2 Planned Survey MD Inc Azi (azimuth) TVD TVDSS DLeg TFace Let Error (usft) V) ("1 (usft) (-ft) (ry (usft) 349.60 0.00 0.00 349.80 279.50 279.50 0.00 0.00 0.41 KOP: Start 1.5.1100' DLS, 190° TF, for 250.18' 400.00 0.76 190.00 400.00 329.90 1.50 190.00 0.45 500.00 2.26 190.00 499.96 429.86 1.50 0.00 0.49 599.78 3.75 190.00 599.60 529.50 1.50 0.00 0.57 Start 2.5°1100' DLS, 5- TF, for 688.99- 600.00 3.75 190.00 599.82 529.72 0.00 0.00 0.57 700.00 6.25 192.00 699.43 629.33 2.51 5.00 0.67 800.00 8.75 192.87 798.57 728.47 2.50 3.00 0.80 900.00 11.25 193.35 897.04 826.94 2.50 2.15 0.95 1,000.00 13.75 193.65 994.66 924.56 2.50 1.68 1.11 1,100.00 16.25 193.87 1,091.25 1,021.15 2.50 1.38 1.30 1,200.00 18.75 194.03 1,186.62 1,116.52 2.50 1.17 1.51 1,288.77 20.97 194.14 1,270.10 1,200.00 2.50 1.02 1.72 Hold for 107.09' 1,300.00 20.97 194.14 1,280.59 1,210.49 0.00 0.00 1.74 1,342.31 20.97 194.14 1,320.10 1,250.00 0.00 0.00 1.98 Base Permafrost 1,395.86 20.97 194.14 1,370.10 1,300.00 0.00 0.00 1.98 Start 3.5°1100' DLS, 19.7- TF, for 1068A' 1,400.00 21.10 194.27 1,373.97 1,303.87 3.50 19.70 1.99 1,500.00 24.43 197.11 1,466.17 1,396.07 3.50 19.57 2.25 1,600.00 27.79 199.30 1,555.95 1,485.85 3.50 16.96 2.54 1,700.00 31.19 201.04 1,642.99 1,572.89 3.50 14.99 2.85 1,800.00 34.60 202.48 1,726.95 1,656.85 3.50 13.47 3,05 1,900.00 38.02 203.68 1,807.52 1,737.42 3.50 12.26 3.29 2,000.00 41.46 204.72 1,884.40 1,814.30 3.50 11.29 3.78 2,100.00 44.91 205.62 1,957.30 1,887.20 3.50 10.50 4.47 2,200.00 48.36 206.42 2,025.96 1,955.86 3.50 9.84 5.33 2,300.00 51.81 207.14 2,090.12 2,020.02 3.50 9.29 6.31 2,400.00 55.27 207.79 2,149.53 2,079.43 3.50 8.83 7.39 2,464.26 57.50 208.18 2,183.10 2,115.00 3.50 8.44 4.36 Hold for 20'. 10-314" x 13-112" 2,484.26 57.50 208.18 2,195.85 2,125.75 0,00 8,37 4.46 Start 3.6"1100' DLS, 8.83" TF, for 148.47' 2,500.00 58.04 208.28 2,204.24 2,134.14 3.50 8.83 4.54 2,600.00 61.50 208.89 2,254.57 2,184.47 3.50 8.78 5.26 2,632.73 62.64 209.08 2,269.91 2,199.81 3.50 8.47 5.55 2,632.75 62.64 209.08 2,269.91 2,199.81 0.00 0.00 5.55 Hold for 10287.72' 2,685.38 62.64 209.08 $294.10 2,224.00 0.00 0.00 6.19 C-30 2,700.00 62.64 209.08 2,300.82 2,230.72 0.00 0.00 6.19 2,800.00 62.64 209.06 2,346.78 2,276.68 0.00 0.00 7.23 2,900.00 62.64 209.08 2,392.74 2,322.64 0.00 0.00 8.36 12172016 2:19:01PM Page 3 COMPASS 5000.1 Build 74 Report Comparry: ConocoPhillips(Alaska) Inc. -WNS Local Coordinate Reference: Well Plan: CD5-314X Project Westem North Slope TVD Reference: Plan: 33.8+36.3 @ 70.10usft (D19) S11 W C135 Alpine West Pad MD Reference: Plan: 33.8+36.3 0 70.10usft (1319) Wag: Plan: CD5414X North Reference: True Wellbome: Plan: CDS-314X Survey Calculation Method: Minimum Curvature Design: CD5314Xwp07 Database: OAKEDMP2 Phumed Survay MD (waft) Inc CI Azi (azimuth) r) TVD (Wft) TVDSS (usft) DL" (•1100usfq TPece 0 Lat. Emor (uero 3,000.00 62.64 209.08 2,438.70 2,368.60 0.00 0.00 9.53 3,100.00 62.64 209.08 2,484.67 2,414.57 0.00 0.00 10.73 3,200.00 62.64 209.08 2,530.63 2,480.53 0.00 0.00 11.96 3,300.00 62.64 209.08 2,576.59 2,506.49 0.00 0.00 13.21 3,400.00 82.66 209.08 2,622.55 2,552.45 0.00 0.00 14.47 3,500.00 62.64 209.08 2,668.51 2,598.41 0.00 0.00 15.73 3,600.00 62.64 209.08 2,714.47 2,644.37 0.00 0.00 17.01 3,700.00 62.64 209.08 2,760.43 2,690.33 0.00 0.00 18.29 3,800.00 62.64 209.08 2,806.39 2,736.29 0.00 0.00 19.57 3,855.93 62.64 209.08 2,832.10 2,762.00 0.00 0.00 20.86 C-10 3,900.00 62.64 209.08 2,852.35 2,782.25 0.00 0.00 20.86 4,000.00 62.64 209.08 2,898.32 2,828.22 0.00 0.00 10.02 4,100.00 62.64 209.08 2,944.28 2,874.18 0.00 0.00 10.50 4,200.00 62.64 209.08 2,990.24 2,920.14 0.00 0.00 10.98 4,300.00 62.84 209.08 3,036.20 2,966.10 0.00 0.00 11.47 4,400.00 62.64 209.06 3,082.16 3,012.06 0.00 0.00 11.96 4,500.00 62.64 209.08 3,128.12 3,058.02 0.00 0.00 12.46 4,600.00 62.64 209.08 3,174.08 3,103.98 0.00 0.00 12.95 4,700.00 62.64 209.08 3,220.04 3,149.94 0.00 0.00 13.45 4,800.00 62.64 209.08 3,266.00 3,195.90 0.00 0.00 13.95 4,900.00 62.64 209.08 3,311.97 3,241.87 0.00 0.00 14.45 5,000.00 62.64 209.08 3,357.93 3,287.83 0.00 0.00 14.96 5,100.00 62.64 209.08 3,403.89 3,333.79 0.00 0.00 15.46 5,200.00 62.64 209.08 3,449.85 3,379.75 0.00 0.00 15.97 5,300.00 62.64 209.08 3,495.81 3,425.71 0.00 0.00 16.48 5,400.00 62.64 209.08 3,541.77 3,471.67 0.00 0.00 16.99 5,500.00 62.64 209.08 3,587.73 3,517.63 0.00 0.00 17.50 5,600.00 62.64 209.08 3,633.69 3,563.59 0.00 0.00 18.01 5,700.00 62.64 209.08 3,679.65 3,609.55 0.00 0.00 18.52 5,800.00 62.64 209.08 3,725.62 3,655.52 0.00 0.00 1903. 5,827.16 62.64 209.08 3,738.10 3,668.00 0.00 0.00 19.54 K-3 5,900.00 62.64 209.08 3,771.58 3,701.48 0.00 0.00 1934 6,000.00 62.64 209.08 3,817.54 3,747.44 0.00 0.00 20.06 6,100.00 62.64 209.08 3,863.50 3,793.40 0.00 0.00 20.57 6,200.00 62.64 209.08 3,909.46 3,839.36 0.00 0.00 21.09 6,300.00 62.64 209.08 3,955.42 3,885.32 0.00 0.00 21.60 6,366.75 62.64 209.08 3,986.10 3,916.00 0.00 0.00 22.12 K-2 6,400.00 62.64 209.06 4,001.38 3,931.28 0.00 0.00 22.12 6,500.00 62.64 209.08 4,047.34 3,977.24 0.00 0.00 22.63 6,600.00 62.64 209.08 4,093.30 4,023.20 0.00 0.00 23.15 6,700.00 62.64 209.08 4,139.27 4,069.17 0.00 0.00 23.67 6,800.00 62.64 209.08 4,185.23 4,115.13 0.00 0.00 24.18 7w/rm76 2:19:01PM Page 4 COMPASS 5000.1 Build 74 Report Company: ConoocPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well Plan: CD5314X Project Western North Slope TVD Reference: Plan: 33.8+38,3 @ 70+1 Wall (D79) Site: CD5 Alpine West Pad MD Reference: Plan: 33.8+36.3 Q 70.10usft (D19) Well: Plan: CD5-314X North Reference: True Wellbore: Plan: C05 -314X Survey Calculation Method: Minimum Curvature Design: CD5.314XWp07 Database: OAKEDMP2 Planned Survey MD Inc Azi (azimuth) TVD TVDSS DLeg TFace Let Error (usft) C) C1 (usft) (usft) (^1100usft) (°) (usft) 6,900.00 62.64 209.08 4,231.19 4,161.09 0.00 0.00 24.70 7,000.00 62.64 209.08 4,277.15 4,207.05 0.00 0.00 25.22 7,100.00 62.64 209.08 4,323.11 4,253.01 0.00 0.00 25.74 7.117.38 62.64 209.08 4,331.10 4,261.00 0.00 0.00 26.26 Alblan 97 7,200.00 62.64 209.08 4,369.07 4,298.97 0.00 0.00 26.26 7,300.00 62.64 209.08 4,415.03 4,344.93 0.00 0.00 26.77 7,358.89 62.64 209.08 4,442.10 4,372.00 0.00 0.00 27.29 Sub97 7,400.00 62.64 209.08 4,460.99 4,390.89 0.00 0.00 27.29 7,500.00 62.64 209.08 4,506.95 4,436.65 0.00 0.00 27.81 7,600.00 62.64 209.08 4,552.92 4,482.82 0.00 0.00 28.33 7,700.00 62.64 209.08 4,598.88 4,528.78 0.00 0.00 28.85 71800.00 62.64 209.08 4,644.84 4,574.74 0.00 0.00 29.37 7,900.00 62.64 209.08 4,690.80 4,620.70 0.00 0.00 29.89 8,000.00 62.64 209.08 4,736.76 4,666.66 0.00 0.00 30.41 8,100.00 62.64 209.08 4,782.72 4,712.62 0.00 0.00 30.93 8,200.00 62.64 209.08 4,828.68 4,758.58 0.00 0.00 31.45 8,300.00 62.64 209.08 4,874.64 4,804.54 0.00 0.00 31.97 8,400.00 62.64 209.08 4,920.80 4,850.50 0.00 0.00 32.49 8,500.00 62.64 209.08 4,966.57 4,896.47 0.00 0.00 33.01 8,600.00 62.64 209.08 5,012.53 4,942.43 0.00 0.00 33.54 8,700.00 62.64 209.08 5,058.49 4,988.39 0.00 0.00 34.06 8,800.00 62.64 209.08 5,104.45 5,034.35 0.00 0.00 34.58 8,900.00 62.64 209.08 5,150.41 5,080.31 0.00 0.00 35.10 9,000.00 62.64 209.08 5,196.37 5,126.27 0.00 0.00 35.62 9,100.00 62.64 209.08 5,242.33 5,172.23 0.00 0.00 36.14 9,200.00 62.64 209.08 5,288.29 5,218.19 0.00 0.00 38.66 9,300.00 62.64 209.08 5,334.25 5,264.15 0.00 0.00 37.19 9,377.99 62.64 209.08 5,370.10 5,300.00 0.00 0.00 37.71 Albian 96 9,400.00 62.64 209.08 5,38022 5,310.12 0.00 0.00 37.71 9,500.00 62.64 209.08 5,426.18 5,356.08 0.00 0.00 38.23 9,600.00 62.64 209.08 5,472.14 5,402.04 0.00 0.00 38.75 9,700.00 62.64 209.08 5,518.10 5,448.00 0.00 0.00 39.27 9,800.00 62.64 209.08 5,564.06 5,493.96 0.00 0.00 39.80 9,900.00 62.64 209.08 5,610.02 5,539.92 0.00 0.00 40.32 10,000.00 62.64 209.08 5,655.98 5,585.88 0.00 0.00 40.84 10,100.00 62.64 209.08 5,701.94 5,631.84 0.00 0.00 41.36 10,200.00 62.64 209.08 5,747.90 5,677.80 0.00 0.00 41.89 10,300.00 62.64 209.08 5,793.87 5,723.77 0.00 0.00 42.41 10,400.00 62.64 209.08 5,839.83 5,769.73 0.00 0.00 42.93 10,500.00 62.64 209.08 5,885.79 5,815.69 0.00 0.00 43.45 10,600.00 62.64 209.08 5,931.75 5,861.65 0.00 0.00 43.98 10,700.00 62.64 209.08 5,977.71 5,907.61 0.00 0.00 44.50 12/72016 2:19:01PM page 5 COMPASS 5000.1 Build 74 Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Coordinate Reference: Well Plan: CD5-314X Project: Western North Slope TVD Reference: Plan: 33.8+36.3 @ 70.10usft (D19) Site: CD5 Alpine West Pad MD Reference: Plan: 33.8+36.3 @ 70.10usft (DI 9) Well: Plan: CD5314X North Reference: True Wellbore: Plan: CDS314X Survey Calculation Method: Minimum Curvature Design: CD5-314Xwp07 Database: OAKEDMP2 Planned Survey MD Inc Azi (azimuth) ND TVDSS DLeg TFece Lot Error (usft) (•1 NI (usft) (usft) (°I100usft) CI Waft) 10,800.00 62.64 209.08 6,023.67 5,953,57 0.00 0.00 45.02 10,900.00 62.64 209.08 6,069.63 5,999.53 0.00 0.00 45.54 11,000.00 62.64 209.08 6,115.59 6,045,49 0.00 0.00 46.07 11,100.00 62.64 209.08 6,161.55 6,091.45 0.00 0.00 46.59 11,200.00 62.64 209.08 6,207.52 6,137.42 D00 0.00 47.11 11,300.00 62.64 209.08 6,253.48 6,183.38 0.00 0.00 47,64 11,400.00 62.64 209.08 6,299.44 6,229.34 0.00 0.00 48.16 11,500.00 62.64 209.08 6,345.40 6,275.30 0.00 0.00 48.68 11,600.00 62.64 209.08 6,391.36 6,321.26 0.00 0.00 49.21 11,700.00 62.64 209.08 6,437.32 6,367.22 0.00 0.00 49,73 11,800.00 62.64 209.08 6,483.28 6,413.18 0.00 0.00 50.25 11,900.00 62.64 209.08 6,529.24 6,459.14 0.00 0.00 50,78 12,000.00 62.64 209.08 6,575.20 6,505.10 0.00 0.00 51.30 12,100.00 62.64 209.08 6,621.17 6,551.07 0.00 0.00 51.82 12,200.00 62.64 209.08 6,667.13 6,597.03 0.00 0.00 52.35 12,300.00 62.64 209.08 6,713.09 6,642.99 0.00 0.00 52.87 12,400.00 62.64 209.08 6,759.05 6,688.95 0.00 0.00 53.39 12,500.00 62.64 209.08 6,805.01 6,734.91 0.00 0.00 53.92 12,600.00 62.64 209.08 6,850.97 6,780.87 0.00 0.00 54.44 12,700.00 62.64 209.08 6,896.93 6,826.83 0.00 0.00 54,96 12,800.00 62.64 209.08 6,942.89 6,872.79 0.00 0.00 55.49 12,900.00 62.64 209.08 6,988.86 6,918.76 0.00 0.00 56.01 12,920.45 62.84 209.08 6,998,25 6,928.15 0.00 0.00 56.12 12,920.57 62.64 209.08 6,998.31 6,928.21 0.00 0.00 56.12 Start 3°1100' DLS, 62.98° TF, for 1405.7-7- 13,000.00 63.74 206.71 7,034.14 6,964.04 3.00 -62.98 56.42 13,013.52 63.93 206.31 7,040.10 6,970.00 3.00 -61,91 56.58 HRZ 13,100.00 65.18 203.79 7,077.25 7,007.15 3.00 -61.74 56.58 13,200.00 66.68 200.95 7,118.04 7,047.94 3.00 -60.65 56.61 13,300.00 68.23 198.16 7,156.39 7,086.29 3.00 -59.49 56.52 13,400.00 69.82 195.44 7,192.19 7,122.09 3.00 58.43 56.31 13,500.00 71.45 192.77 7,225.35 7,155.25 3.00 -57.45 56.01 13,600.00 73.13 190.16 7,255.77 7,185.67 3.00 -56.57 55.60 13,650.62 73.98 188.95 7,270.10 7,200.00 3.00 -55.77 55.11 HRZ Base 13,700.00 74.83 187.59 7,283.38 7,213.28 3.00 55.40 55.11 13,800.00 76.56 185.08 7,308.09 7,237.99 3.00 -55.06 54.52 13,900.00 78.32 182.57 7,329.84 7,259.74 3.00 -54,44 53,86 14,000.00 80.09 180.11 7,348.57 7,278.47 3.00 -53.89 53.12 14,100.00 81.89 177.68 7,364.23 7,294.13 3.00 -53,43 52.31 14,200.00 83.70 175.26 7,376.77 7,306.67 3,00 -53.05 51.42 14,286.76 85.28 173.19 7,385.10 7,315.00 3.00 52.75 50,46 Kuparuk C 14,300.00 85.52 172.87 7,386.16 7,316.06 3.00 52,55 50,46 urrzu70 2.179.01PM Page 6 COMPASS 5000. I Build 74 Report Company. ConocoPhillips(Alaska) Inc. -VMS Local Coordinate Reference: Well Plan: CD5-314X Project Western North Slope TVD Reference: Plan: 33.8+36.3 70.10usft (D19) Site: CD5 Alpine West Pad MD Reference: Plan: 33.8+36.3 70.10usft (019) Well: Plan: CD5-314X North Reference: True Wellbore: Plan: CDS-314X Survey Calculation Method: Minimum Curvature Deslgm CD5-314Xwp07 Database: OAKEDMP2 Planned Survey MD Inc Azi (azimuth) TVD TVDSS DLeg TFaca Lat Error (Wff) (1) (0) Waft) (uaR) (WousR) C) (usit) 14,326.22 86.00 172.24 7,388.10 7,318.00 3.00 -52.52 50.20 7-5/8"x 9.718" by 11-- 1"14,326.34 14,326.34 86.00 172.24 7,388.11 7,318.01 0.00 0.00 50.20 Hold for 20' 14,346.22 86.00 172.24 7,389.50 7,319.40 0.00 0.00 50.30 14,346.34 86.00 172.24 7,389.50 7,319.40 0.00 0.00 50.30 Start 4.1100' DLS, 0° TF, for 98.06' 14,395.88 87.99 172.24 7,392.10 7,322.00 4.01 0.00 50.68 LCU 14,400.00 88.15 172.24 7,392.24 7,322.14 4.00 0.00 50.68 14,444.27 89.92 172.24 7,392.98 7,322.86 4.00 0.00 51.00 14,444.40 89.92 172.24 7,392.98 7,322.88 0.00 0.00 51.00 Hold for 11882.59' 14,500.00 89.92 172.24 7,393.06 7,322.96 0.00 0.00 51.41 14,600.00 89.92 172.24 7,393.19 7,323.09 0.00 0.00 52.18 14,700.00 89.92 172.24 7,393.33 7,323.23 0.00 0.00 52.97 14,800.00 89.92 172.24 7,393.47 7,323.37 0.00 0.00 53.80 14,900.00 89.92 172.24 7,393.60 7,323.50 0.00 0.00 54.65 15,000.00 89.92 172.24 7,393.74 7,323.64 0.00 0.00 55.54 15,100.00 89.92 172.24 7,393.87 7,323.77 0.00 0.00 56.45 15,200.00 89.92 172.24 7,394.01 7,323.91 0.00 0.00 57.38 15,300.00 89.92 172.24 7,394.14 7,324.04 0.00 0.00 58.34 15,400.00 89.92 172.24 7,394.28 7,324.18 0.00 0.00 59.32 15,500.00 89.92 172.24 7,394.41 7,324.31 0.00 0.00 60.33 15,600.00 89.92 172.24 7,394.55 7,324.45 0.00 0.00 61.35 15,700.00 89.92 172.24 7,394.69 7,324.59 0.00 0.00 62.40 15,800.00 89.92 172.24 7,394.82 7,324.72 0.00 0.00 63.46 15,900.00 89.92 172.24 7,394.96 7,324.86 0.00 0.00 54.07 16,000.00 89.92 172.24 7,395.09 7,324.99 0.00 0.00 54.36 16,100.00 89.92 172.24 7,395.23 7,325.13 0.00 0.00 54.65 16,200.00 89.92 172.24 7,395.36 7,325.26 0.00 0.00 54.95 16,300.00 89.92 172.24 7,395.50 7,325.40 0.00 0.00 55.25 16,400.00 89.92 172.24 7,395.64 7,325.54 0.00 0.00 55.55 16,500.00 89.92 172.24 7,395.77 7,325.67 0.00 0.00 55.86 16,600.00 89.92 172.24 7,395.91 7,325.81 0.00 0.00 56.18 16,700.00 89.92 17224 7,396.04 7,325.84 0.00 0.00 56.49 16,800.00 89.92 172.24 7,396.16 7,328.08 0.00 0.00 56.81 16,900.00 89.92 172.24 7,396.31 7,326.21 0.00 0.00 57.14 17,000.00 89.92 172.24 7,396.45 7,326.35 0.00 0.00 57.47 17,100.00 89.92 172.24 7,396.59 7,326.49 0.00 0.00 57.80 17,200.00 89.92 172.24 7,396.72 7,328.62 0.00 0.00 58.14 17,300.00 89.92 172.24 7,396.86 7,326.76 0.00 0.00 58.48 17,400.00 89.92 172.24 7,396.99 7,326.89 0.00 0.00 58.83 17,500.00 89.92 172.24 7,397.13 7,327.03 0.00 0.00 59.18 17,800.00 89.92 172.24 7,397.26 7,327.16 0.00 0.00 59.53 12/72016 2:19.01PM Page 7 COMPASS 5000.1 Build 74 Report Company: CM=Phillips(Alaska) Inc. -WNS Local Coordinate Reference: Well Plan: CD5-314X Project Western North Slope TVD Reference: Plan: 33.8+38.3 @ 70.10usft (1319) Sae: CD5 Alpine West Pad MD Reference: Plan: 33.8+36.3 @ 70.10usR (D19) Well: Plan: CD5-314X North Reference Tme Wellbore: Plan: CDS-314X Survey Calculation Method: Minimum Curvature Design: CD5-314Xwp07 Database: OAKEOMP2 Planned Survey MD Inc Azi (azimuth) TVD TVDSS DLeg TFace Lat. Ertor (usR) CI CI (Mfg (usR) ('1100usR) CI (wfU 17,700.00 89.92 172.24 7,397.40 7,327.30 0.00 0.00 59.88 17,800.00 89.92 172.24 7,397.53 7,327.43 0.00 0.00 60.24 17,900.00 89.92 172.24 7,397.67 7,327.57 0.00 0.00 60.60 18,000.00 89.92 172.24 7,397.81 7,327.71 0.00 0.00 60.97 18,100.00 89.92 172.24 7,397.94 7,327.84 0.00 0.00 61.34 18,200.00 89.92 172.24 7,398.08 7,327.98 0.00 0.00 61.71 18,300.00 89.92 172.24 7,398.21 7,328.11 0.00 0.00 62.09 18,400.00 89.92 172.24 7,398.35 7,328.25 0.00 0.00 62.46 18,500.00 89.92 172.24 7,398.48 7,328.38 0.00 0.00 62.85 18,600.00 89.92 17224 7,398.62 7,328.52 0.00 0.00 63.23 18,700.00 89.92 172.24 7,398.76 7,328.66 0.00 0.00 63.62 18,800.00 89.92 172.24 7,398.89 7,328.79 0.00 0.00 64.01 18,900.00 89.92 172.24 7,399.03 7,328.93 0.00 0.00 64.40 19,000.00 89.92 172.24 7,399.16 7,329.06 0.00 0.00 64.80 19,100.00 89.92 172.24 7,399.30 7,329.20 0.00 0.00 65.19 19,200.00 89.92 172.24 7,399.43 7,329.33 0.00 0.00 65.60 19,300.00 89.92 17224 7,399.57 7,329.47 0.00 0.00 66.00 19,400.00 89.92 172.24 7,399.70 7,329.60 0.00 0.00 66.41 19,500.00 89.92 172.24 7,399.84 7,329.74 0.00 0.00 66.81 19,600.00 89.92 172.24 7,399.98 7,329.88 0.00 0.00 67.22 19,700.00 89.92 172.24 7,400.11 7,330.01 0.00 0.00 67.64 19,800.00 89.92 172.24 7,400.25 7,330.15 0.00 0.00 66.05 19,900.00 89.92 172.24 7,400.38 7,330.28 0.00 0.00 68.47 20,000.00 89.92 172.24 7,400.52 7,330.42 0.00 0.00 68.89 20,100.00 89.92 172.24 7,400.65 7,330.55 0.00 0.00 69.32 20,200.00 89.92 172.24 7,400.79 7,330.69 0.00 0.00 69.74 20,300.00 89.92 172.24 7,400.93 7,330.83 0.00 0.00 70.17 20,400.00 89.92 172.24 7,401.06 7,330.96 0.00 0.00 70.60 20,500.00 89.92 172.24 7,401.20 7,331.10 0.00 0.00 71.03 20,600.00 89.92 172.24 7,401.33 7,331.23 0.00 0.00 71.46 20,700.00 89.92 172.24 7,401.47 7,331.37 0.00 0.00 71.90 20,800.00 89.92 172.24 7,401.60 7,331.50 0.00 0.0) 72.34 20,900.00 89.92 172.24 7,401.74 7,331.64 0.00 0.00 72.78 21,000.00 89.92 172.24 7,401.87 7,331.77 0.00 0.00 73.22 21,100.00 89.92 172.24 7,402.01 7,331.91 0.00 0.00 73.66 21,200.00 89.92 172.24 7,402.15 7,332.05 0.00 0.00 74.10 21,300.00 89.92 172.24 7,402.28 7,332.18 0.00 0.00 74.55 21,400.00 89.92 172.24 7,402.42 7,332.32 0.00 0.00 75.00 21,500.00 89.92 172.24 7,402.55 7,332.45 0.00 0.00 75.45 21,600.00 89.92 172.24 7,402.69 7,332.59 0.00 0.00 75.90 21,700.00 89.92 172.24 7,402.82 7,332.72 0.00 0.00 76.36 21,800.00 89.92 172.24 7,402,96 7,332.86 0.00 0.00 76.81 21,900.00 89.92 172.24 7,403.10 7,333.00 0.00 0.00 77.27 22,000.00 89.92 172.24 7,403.23 7,333.13 0.00 0.00 77.73 120/1016 2:19:O1PM Page 8 COMPASS SW0.1 Build 74 Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Coordinate Reference: Well Plan: CD5-314X Project: Western Norm Slope TVD Reference: Plan: 33.8+36.3 @ 70.10usft (D19) Site: CD5 Alpine West Pad MD Reference: Plan: 33.8+36.3 @ 70.10usft (D79) Well: Plan: CD5.314X North Reference: True Wellbore: Plan: CDS-314X Survey Calculation Method: Minimum Curvature Design: CD5314Xwp07 Database: OAKEDMP2 Planned Survey MD Inc AN (azimuth) TVD TVDSS 01-e9 TFace Let Error (usft) r) r) (usft) (usft) (WouslU r) (usft) 22,100.00 89.92 172.24 7,403.37 7,333.27 0.00 0.00 78.19 22,200.00 89.92 172.24 7,403.50 7,333.40 0.00 0.00 78.65 22,300.00 89.92 172.24 7,403.64 7,333.54 0.00 0.00 79.11 22,400.00 89.92 172.24 7,403.77 7,333.67 0.00 0.00 79.58 22,500.00 89.92 172.24 7,403.91 7,333.81 0.00 0.00 80.04 22,600.00 89.92 172.24 7,404.05 7,333.95 0.00 0.00 80.51 22,700.00 89.92 172.24 7,404.18 7,334.08 0.00 0.00 80.98 22,800.00 89.92 172.24 7,404.32 7,334.22 0.00 0.00 81.45 22,900.00 89.92 172.24 7,404.45 7,334.35 0.00 0.00 81.92 23,000.00 89.92 172.24 7,404.59 7,334.49 0.00 0.00 62.40 23,100.00 89.92 172.24 7,404.72 7,334.62 0.00 0.00 82.87 23,200.00 89.92 172.24 7,404.88 7,334.76 0.00 0.00 83.35 23,300.00 89.92 172.24 7,404.99 7,334.89 0.00 0.00 83.82 23,400.00 89.92 17214 7,405.13 7,335.03 0.00 0.00 84.30 23,500.00 89.92 172.24 7,405.27 7,335.17 0.00 0.00 84.78 23,600.00 89.92 172.24 7,405.40 7,335.30 0.00 0.00 85.26 23,700.00 89.92 172.24 7,405.54 7,335.44 0.00 0.00 85.74 23,800.00 89.92 172.24 7,405.67 7,335.57 0.00 0.00 86.23 23,900.00 89.92 172.24 7,405.81 7,335.71 0.00 0.00 86.71 24,000.00 89.92 172.24 7,405.94 7,335.84 0.00 0.00 87.20 24,100.00 89.92 172.24 7,406.08 7,335.98 0.00 0.00 87.68 24,200.00 89.92 172.24 7,406.22 7,336.12 0.00 0.00 88.17 24,300.00 89.92 172.24 7,408.35 7,336.25 0.00 0.00 88.66 24,400.00 89.92 172.24 7,406.49 7,336.39 0.00 0.00 89.15 24,500.00 89.92 172.24 7,406.62 7,338.52 0.00 0.00 89,64 24,600.00 89.92 172.24 7,406.76 7,336.66 0.00 0.00 90.13 24,700.00 89.92 172.24 7,406.89 7,336.79 0.00 0.00 90.63 24,800.00 89.92 172.24 7,407.03 7,336.93 0.00 0.00 91.12 24,900.00 89.92 172.24 7,407.18 7,337.06 0.00 0.00 91.61 25,000.00 89.92 172.24 7,407.30 7,337.20 0.00 0.00 92.11 25,100.00 89.92 172.24 7,407.44 7,337.34 0.00 0.00 92.61 25,200.00 89.92 172.24 7,407.57 7,337.47 0.00 0.00 93.10 25,300.00 89.92 172.24 7,407.71 7,337.61 0.00 0.00 93.60 25,400.00 89.92 172.24 7,407.84 7,337.74 0.00 0.00 94.10 25,500.00 89.92 172.24 7,407.98 7,337.88 0.00 0.00 94.60 25,600.00 89.92 172.24 7,408.11 7,338.01 0.00 0.00 95.10 25,700.00 89.92 172.24 7,408.25 7,338.15 0.00 0.00 95.61 25,800.00 89.92 172.24 7,408.39 7,338.29 0.00 0.00 96.11 25,900.00 89.92 172.24 7,408.52 7,338.42 0.00 0.00 96.61 26,000.00 89.92 172.24 7,408.66 7,338.56 0.00 0.00 97.12 26,100.00 89.92 172.24 7,408.79 7,338.69 0.00 0.00 97.62 26,200.00 89.92 17224 7,408.93 7,338.83 0.00 0.00 98.13 26,300.00 69.92 172.24 7,409.06 7,338.96 0.00 0.00 98.63 26,326.86 89.92 172.24 7,409.10 7,339.00 0.00 0.00 98.77 TD: 26326.86' MD, 7409.1' TVD - 4-1/2" x 6-3/4" 1202016 2:19:01PM Page 9 COMPASS 5000 1 Build 74 Company: ConomPhillips(Alaska) Inc.-WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-314X Wellbore: Plan: CD5.314X Design: CD5-314Xwp07 Planned Survey TVD TVDSS MD Inc Azi (azimuth) (usft) 115.90 20" x 47' Report Local Coordinate Reference: Well Plan: CD5.314X TVD Reference: Plan: 33.8+36.3 Q 70.10usft (D19) MD Reference: Plan: 33.8+38.3 @ 70.10usft (019) Norm Reference: True Survey Calculation Method: Minimum Curvature Database: OAKEDMP2 (watt) TVD TVDSS DLeg TFace Lat. Error (usft) (usft) (°1100usft) (°) (usft) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (watt) (usft) Name (") 4") 115.90 115.90 20" x 47' 20 42 2,464.26 2,185.10 10-3/4'x 13-1/2" 10-3/4 131/2 14,326.22 7,388.10 7-518' x 9.7/8" by 11" 7-5/8 11 26,326.86 7,409.10 4-1/2"x6-314' 4-1/2 6-3/4 Fonmations Hold for 107.09' - 1,370.10 Measured Vertical Start 3.5'1100' DLS, 19.7" TF, for 1068.4- Dip Depth Depth Dip Direction (usft) (usft) Name Limolo9y Cl (") 14,395.88 7,392.10 LCU 2,289.91 -919.87 14,286.76 7,385.10 Kuparuk C 12,920.57 6,998.31 5,827.16 3,738.10 K-3 Start 3°/100' DLS, -62.98' TF, for 1405.77- 14,326.34 7,358.89 4,442.10 Sub97 5,043.39 Hold for 20' 9,377.99 5,370.10 Albian 96 -10,224.14 -5,040.70 3,855.93 2,832.10 C-10 7,392.98 -10,321.22 13,013.52 7,040.10 HRZ 26,326.86 7,409.10 6,366.75 3,986.10 K-2 TD: 26326.86' MD, 7409.1' TVD 2,685.38 2,294.10 C-30 13,650.62 7,270.10 HRZ Base 7,117.38 4,331.10 Aibian 97 1,342.31 1,320.10 Base Permafrost Plan Annotations -� Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (ueftj (usft) Comment 349.60 349.60 0.00 0.00 KOP: Start 1.5°/100' DLS, 190° TF, for 250.18' 599.78 599.60 -8.07 -1.42 Start 2.5°1100' DLS, 5' TF, for 688.99' 1,288.77 1,270.10 -150.88 -35.70 Hold for 107.09' 1,395.86 1,370.10 -168.03 45.06 Start 3.5'1100' DLS, 19.7" TF, for 1068.4- 2,464.26 2,185.10 -792.10 -314.15 Hold for 20' 2,484.26 2,195.85 406.97 -322.12 Start 3.5°/100' DLS, 8.83" TF, for 148.47' 2,632.75 2,289.91 -919.87 -383.79 Holo for 10287.72' 12,920.57 6,998.31 -8,904.83 4,824.71 Start 3°/100' DLS, -62.98' TF, for 1405.77- 14,326.34 7,388.11 -10,204.38 5,043.39 Hold for 20' 14,346.34 7,389.50 -10,224.14 -5,040.70 Start 4'/100' DLS, 0° TF, for 98.06' 14,444.40 7,392.98 -10,321.22 -5,027.47 Hold for 11882.59' 26,326.86 7,409.10 -22,094.94 -3,423.68 TD: 26326.86' MD, 7409.1' TVD Checked By: Approved By: Date: 12172016 2: la:01PM Page 10 COMPASS 5000.1 Build 74 Pool Report CDS-314Xwp07 Surface Location I A C3 CPA?Coondinate I -From :— - Datum NAD83 Regierc alaska r Latitude/Longitude' IDecimalDegrees C UTM Zone: I — r- South G Stale Plane Zarre: q Units:.g r Legal Desaption(NAD27 only) - Starting Coordinates: - Datum Nz27 , Regim: a;L r Latitude/Lmgitude IDegreesMinutes Seconds . r UTM Zone: True r South r State Plane Zone: l¢ , Units: us ft r Legal Desmptim (NAD27 ordy) EndingCoardmtes: - Y, 11489317.35 k 349284_200990811 Y' 5965589.94 Y: 5965843.97877467 r--`-- t Quit Help { I Transform Surface Location Q CPAD Cocndinate Converter Datum: INAD83 Region: alaska r Latitude/Longitude jDacimalDegrees r UTM Zme: r— r South G State Plane Zone: F'-] Units: us -fl . r Legal Descriphcr,(Ne.D27 only) Datum: NAD27Regi0n alaska r LatitudeAwgitude IDegnsesMinutesSecondir . r UTM Zone: True r South r State Plane Zone: F----3 Unts: usit r Legal Descrom (NAD27 a*) - Stating Coordnates: Legal Description — X: 1489317.35 Township: 011 IR -_,3 Range: Fu Y 5965569.94 Meridian rLI . Section: I � 16 369.47527 FEL . 26938854 Quit Help CD5-314Xwp07 Surface Cas ® CPA! Cooadinate Converter - From: Datum: NAD83 Region alaska . r Latitude/Longitude IDecirnalDegrees r UTM Zone:I — r" South r State Pore Zone: F-----] Units: urk r Legal Description (NAD27 any] Datum NAD27 Region alaska r Ladlude/Longitude jDegreesMinutesSeconds . r UTM Zone: True r South r State Plane Zone:F4--:-:] Umts: us -`It . r Legal Descdptiw (NAD27 any) Starting Coordinates: _--� - - Endng Coordinates: + X: 1488967.34 X 348954.154167633 Y: 15964804.38 Y: 1 5965058.42394324 1'I ,Trensfarm _. Quit Help CD5-314Xwp07 Surface 4 CPA! Coordinate Corner Rom: — -- Datum: NAD83 Region: jalaslue r Latitude/Longitude Decimal Degrees r UTM Zone: F— r South r State Plane Zone: (q ] Units:.ft i LEI, F Starting Coordnates: X 1489987.34 Y: 5964804.38 Dater NAD27 . Region: alaska r Latitude/Longitude Degrees Minutes Seconds? r UTM Zone: True r South r State Plan Zone: F-':-:1 Units: usk r Legal Description (NAD27 only) r Legal Description Township: 011 Range: 1104 [E-3, Meriden: 1" J Section: l6 FNL . 1161.5501 FEL 3011.1912 Transform Quit Help I C3 j... Z� CD5-314Xwp07 Intermediate Casing & Heel >A From.. DatumNAD83 Region alaska . r Latitude/Longitude DecimalDegrees —� C UTM Zone: r" r South IT State Wane Zone: I' J Units: usft . C Legal Description 9W27 ority] -To: DatumNAD27 _ Region alaska C Latitude/Longitude IDegreesMirvAesSecords . r UTM Zone: True r South R State Plane Zone: 4r7 ] Unit" ,—R r Legal Dwc plim W27 o*) r Starting Coordinates: En*v Coor*ker — Y' 11484070.00 X 344036.369521973 ! Y: 15955490.00 Y: 5955744.15819551 Transform i quit Help Intermediate Q CPA Ccc �dmate Ccn•:erter & Heel @ I �3 From:.. Datain INAD83 J Region alaska C Latitude/Longitude DecimalDegrees r UTM Zone: I — r South G State Wane Zone: f' J Units: us -Ft i LegaDrsro.^IP1�L=%ordpi i Staring coordinates: X 148407Q00 Y: 159549aCO Datum NAD27j Region: alaska f Latitude/Longitude IDegreesMinutesSecorids . f UTM Zone: True r South r State Warne Zone: fq__],3 Units: us -ft 0' Legal Descrption W27 a*) Toi*Witor 011 I"-1 Range: r I` -1 Merman: U Sectim 25 FNL75.037803 FEL 2805.9418 i Transform _ Quit Help ICD5-314Xwp07 Toe ® CPAICoordinate Comrerter - - From Datum NAD83 . Region: alaska !' Latitude/Longitude Decimal Degrees !' UTM zone: I — r South i � G State Plane Zone: I' ---] Units: us -ft r Legal Descrption (NAD27 cmW Datura NAD27j Region alaska r Latitude/Longitude IDegreesMinutesSeconds� * UTM Zone: True r South G State Plane Zane: I' J Unts: us -ft r Legal Description[NAD27 oral ) Starting Cooudnates: ---- — - — - Endurg Coordnalea: X: 11485450.00 X 345415.904332213 Y: 5943570.D YY: 5943824.02644463 -- Translarm Quit Help -314Xwp07 Toe v CPA: Ce. d.^:ate Conatser From: Datum: NAD83 Region: alaska C Latitudekongitude IDecimaiDegrees f UTM Zone: r— r South F State Plane Zone: F-:-:1 Units: Ps -ft 7-1 r Le. =.. Le,criptton JNAD27 only) -- Starling Ccadnates: X: 11485450.00 Y: 15943W.00 Datura: NAD27 Region alazka r LatitudelLongitude jDegieesMinutesSeoonds • UTM Zone: True r South f•Stale Plane Zone: n Units: urft G Legh Description(NAD27 only) -Legal Descrgt M _-- Township: 010 N . Range: Meridan I" D SecBon:Fl FL—_-] '1_345.0738 FEL . 1183.8227 ( Transform i Qua Help 10:08, December 082018 CDS-314Xwp07 Quarter Mile View WELLBORE TARGET nEAll B 11AP COdRDINATEE) Name CDSJ1tX 0.1 HeAdd180uetle, MU 734.10 LDS311% M:T.0 dd18NA 1JBB 10 LDSJ14% 03.T0e LN<k �Redue: 13X.00) Clmb (Re® 100001 MU16 NA LpS31/%OT.T0e dd180uMer ANb 1109.10 AOB.ID LbGe(R.0ue 100.00) C'vde (ReNus. 13M. 0) -9000 - 3 Qe` ' C05-315Pi3 coy9 ?2000- 2000O 0 O `2-1' 5000 .+... Cp5.313 L � I Y 000 8000- 0 O CD5-315 -21000 — - - 05.31 XwP07 i -24000 -15000 -12000 -9000 -6000 -3000 0 3000 6000 9000 West( -)/East(+) (3000 usft/in) I As -built �n 7' —111-11--.. REV DATE BY L APP DESCRIPTION 1 4/24/15 CZ DB C.A. UPDATED PER K150003ACS 2 5/2/16 CZ GD C.A. UPDATED PER K160003ACS ALPINE SATELLITE DEVELOPMENT LOCATION OF - THIS SURVEY n T12 o Q T11 N CD5f CD4 TO ALPINE D „ ACCESS ROAD N CD G' LCWFa m0 AP 9 iD L IT CD1 T r^ VICINITY MAP NOT TO SCALE LEGEND: O PROPOSED CONDUCTOR 0 EXISTING CONDUCTOR SECTION 7, T. 11 N., R. 4 E., U.M. SECTION 18, PPo CD -5 of s��` PAD SN Qoo OE51GN �oQ0, 0%000a'� PLANT N N 0 NOTE: 15•4 sz" � Ln CONDUCTOR CD5-x14 WAS PLUGGED AND ro ABANDONED APRIL 2016. LCMF n O KUUKPIK `n UMIAQ ALPINE SURVEY OFFICE PHONE :907-670-4739 ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD -5 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE NO. 15-03-02-1 04/18/2015 DRAWING NO: 1 CE-CD50-1025 PART: I REV: 1 OF 3 2 Well: CRU CD5-314X <== Data Input Name: CPAI <== Data Input Mud Weight (ppg) 11.50 <== Data Input Weak point or LOT - Measured depth (ft) 2,484' <== Data Input Weak point or LOT True vertical depth (ft) 2,185' <== Data Input Weak point or LOT - Hole angle (deg) 57.50 <== Data Input Weak point or LOT - Hole size (in) 13.500" <== Data Input Weak point pressure or LOT - EMW (ppg) 12.00 <== Data Input _ Zone of interest - Measured depth (ft) 14,100' <== Data Input u Zone of interest - True vertical depth (ft) 7,364' <== Data Input Zone of interest - Hole angle (deg) 63.0° <== Data Input Zone of interest - Hole size (in) 11.000" <== Data Input " Zone of interest - Pore ressure EMW 11.00 <== Data Input v Gas gradient (psilft) 0.10 <== Data Input Bottom hole assembly OD (in) 8.0" <== Data Input Bottom hole assembly length (ft) 151' <== Data Input Drill pipe OD (in) 5.000" <== Data Input BHA annular vol. @ zone of interest (bbl/ft) e 0.0554 _. DP annular vol. zone of interest (bbl/ft) 0.0933 DP annular vol. weak point bbllft F 0.1528 Additional safety margin (psi) 0.00 <== Data Input _ Weak point pressure (psi): Pio 1,363 psi Weak point pressure - Safety margin: Pmax 1,363 psi Pmax EMW 12.00 pp Max anticipated formation pressure (psi): Pf i- Weak Pt to Zone of Interest distance (TVD ft): OH (TVD) 5,179' Weak Pt to Zone of Interest distance (MD ft): OH (MD) 11,636' Maximum influx height at the bit (TVD ft): H (TVD) 499' Maximum influx height at the bit (MD ft): H {MD} 1,098' Calc. volume of {H} around BHA: Vlbha 8.4 bbl Calc. volume of {H} around drill pipe: Vldp 88.3 bbl Calc. volume that H equals @ initial shut in: V1 96.7 bbl Calc. vol. that H equals @ weak point (MD ft): VWp 141.7 bbl Calc. volume of Vwp @ initial shut in: V2 45.9 bbl Kick Tolerance: V2 45.9 bbl NOTE: V Lo3/17/17 TRANSMITTAL LETTER CHECKLIST WELL NAME: ` R(A, C45- - J lI x PTD: Zj o ✓ Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: ( cd Z 6 91 POOL: giy6r Apia/. pia/ d / Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. API No. 50- _ (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - from records, data and logs acquired for well (name on perrm . The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool COLVILLE RIVER, ALPINE OIL - 120100 Engineering Commissio er: PTD#:2170210 Company CONOCOPHILLIPS ALASKA INC — Initial Class/Type Administration 17 Nonconven, gas conforms to AS31,05.030Q,1.A),0.2.A-D) NA 1 Permit fee attached _ NA 2 Lease number appropriate Yes 3 Unique well. name and number Yes 4 Well located in defined pool Yes 5 Well located proper distance from drilling unit boundary Yes 6 Well located proper distance from. other wells Yes 7 Sufficient acreage. available in drilling unit Yes 8 If deviated, is wellbore plat. included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force _ Yes Appr Date 11 Permit can be issued without conservation order Yes PKB 2/23/2017 12 Permit can be issued without administrative approval Yes 13 Can permit be approved before 15 -day wait Yes 14 Well located within area and. strata authorized by Injection Order # (put 10# in. comments) (For. NA 15 All wells within 1/4 mile area of review identified (For service well only). _ _ NA 16 Pre -produced injector: duration. of pre -production less than 3 months. (For service well only) _ NA 18 Conductor string. provided Yes Engineering 19 _ Surface casing. protects all known USDWs Yes 20 CMT. vol adequate to circulate. on conductor $ surf csg Yes 21 CMT vol. adequate to tie-in long string to surf csg No 22 CMT will cover all known. productive horizons _ No 23 Casing designs adequate for C, T B & permafrost Yes 24 Adequate tankage or reserve pit Yes 25 If a re -drill, has a 10-403 for abandonment been approved NA 26 Adequate wellbore separation. proposed Yes 27 If diverter required, does it meet regulations Yes Appr Date 28 Drilling fluid program schematic & equip list adequate Yes VTL 3/16/2017 29 BOPEs,.do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes 31 Choke. manifold complies w/API RP -53 (May 84). Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable _ Yes 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit. can be issued w/o hydrogen sulfide measures No Geology 36 Data. presented on potential overpressure zones Yes Appr Date 37 Seismic analysis of shallow gas. zones NA PKB 2/23/2017 38 Seabed condition survey (if off -shore) _ _ _ _ NA 39 Contact name/phone for weekly. progress reports. [exploratory only] NA Well Name: COLVILLE RIV UNIT tt�D5-314x _ _ _Program DEV Well bore seg _DEV / PEND _ GeoArea 890 —_ — Unit 50380 On/Off Shore On_ - _ Annular Dispc FEEONPRA04, Surf; AA092347, portion, AA092344 Top Prod; AA081817 portion Prod; AA094167, TD. CRU CD5-314X COLVILLE RIVER, ALPINE. OIL - 120100, governed by Conservation Order No. 4438. CO 4438 contains no spacing restrictions with respect to drilling unit boundaries. CO 443B has no intenvell spacing restrictions. 80' conductor set Surface casing will be set to 2464' MD _ 160% excess cement planned TOC is 13300' MD Productive. interval will be completed with. uncemented perf pup liner Rig has steel tanks; all waste to approved disposal wells. Anti -collision analysis complete; no major risk failures Diverter waiver granted per 20 AAC 25.035(h)(2) _ Max formation pressure is 4224 psig(11.0 ppg EMW);will drill w/ 9.0-11.5 ppg EMW MPSP is 3486 psig; will test BOPS to 3600 psig H2S measures required H2S measures required. Expected reservoirpressure is 10.9 ppg EMW; will be drilled using.9.0 to 11.5 ppg mud. Onshore development well to be drilled, _ Geologic Commissioner: Date: 31 Engineering Commissio er: Date 1?- 22_,, Public Co misstoner Date 0rS z? e 7 A,