Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout211-115MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section:2 Township:10N Range:14E Meridian:Umait Drilling Rig:Rig Elevation:Total Depth:12,975 Lease No.:ADL 028311 Operator Rep:Suspend:P&A:X Conductor:20"O.D. Shoe@ 107 Feet Csg Cut@ na Feet Surface:13 3/8"O.D. Shoe@ 2709 Feet Csg Cut@ na Feet Intermediate:9 5/8"O.D. Shoe@ 9696 Feet Csg Cut@ na Feet Production:O.D. Shoe@ Feet Csg Cut@ na Feet Liner:7"O.D. Shoe@ 10868 Feet Csg Cut@ na Feet Liner:3 1/4"O.D. Shoe@ 11533 Feet Csg Cut@ na Feet Liner:2 3/8"O.D. Shoe@ 12787 Feet Csg Cut@ na Feet Tubing:4 1/2"O.D. Tail@ 10645 Feet Tbg Cut@ 3425 Feet Type Plug Founded on Depth (Btm)Depth (Top)MW Above Verified Fullbore Retainer 10855 ft 10237 ft Wireline tag Initial 15 min 30 min 45 min Result Tubing 2755 2690 2660 IA 44 44 44 OA 161 160 160 Remarks: Attachments: I traveled to PBU 06-12B to witness a cement plug tag with slick line and a MIT-T for P&A (plug back for redrill). The wire line tool string consisted of 8 feet of wieght bar, oil jars, long stroke spanges, and a 30 inch sample bailer. Tag string is 210lbs hanging wt. They achieved a solid tag on the top of cement @ 10,223 ft MD and a retag at 10,237 ft MD. Good sample of cement was returned in the bailer. MITT passed. April 2, 2025 Adam Earl Well Bore Plug & Abandonment PBU 06-12B Hilcorp North Slope LLC PTD 2111150; Sundry 325-111 none Test Data: P Casing Removal: Caleb P. Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): rev. 3-24-2022 2025-0402_Plug_Verification_PBU_06-12B_ae                       Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 5/08/2025 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20250508 Well API #PTD #Log Date Log Company Log Type AOGCC E-Set# BRU 241-26 50283201970000 224068 4/15/2025 AK E-LINE Perf BRU 244-27 50283201850000 222038 4/19/2025 AK E-LINE Perf IRU 11-06 50283201300000 208184 4/14/2025 AK E-LINE CIBP PBU S-22B 50029221190200 197051 4/15/2025 AK E-LINE IPROF SRU 231-33 50133101630100 223008 4/13/2025 AK E-LINE CIBP PBU 14-33B 50029210020200 223067 1/22/2025 BAKER MRPM END 1-65A 50029226270100 203312 4/15/2025 HALLIBURTON COILFLAG END 2-72 50029237810000 224016 4/11/2025 HALLIBURTON LDL END 2-72 50029237810000 224016 4/11/2025 HALLIBURTON MFC40 MPU R-105 50029238150000 225017 4/20/2025 HALLIBURTON CAST-CBL NS-19 50029231220000 202207 4/12/2025 HALLIBURTON RBT PBU 06-12B 50029204560200 211115 3/22/2025 HALLIBURTON RBT PBU 07-22A 50029209250200 212085 3/31/2025 HALLIBURTON RBT PBU B-30B 50029215420100 201105 4/9/2025 HALLIBURTON RBT-COILFLAG PBU H-17A 50029208620100 197152 4/10/2025 HALLIBURTON RBT-COILFLAG PBU H-29B 50029218130200 225005 5/1/2025 HALLIBURTON RBT PBU J-10B 50029204440200 215112 4/15/2025 HALLIBURTON RBT PBU M-207 50029238070000 224141 4/21/2025 HALLIBURTON IPROF PBU Z-25 50029219020000 188159 4/23/2025 HALLIBURTON IPROF PBU Z-31 50029218710000 188112 4/25/2025 HALLIBURTON IPROF Please include current contact information if different from above. T40372 T40373 T40374 T40375 T40376 T40377 T40378 T40379 T40379 T40380 T40381 T40382 T40383 T40384 T40385 T40386 T40387 T40388 T40389 T40390 PBU 06-12B 50029204560200 211115 3/22/2025 HALLIBURTON RBT Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.05.08 12:42:44 -08'00' 325-111 By Gavin Gluyas at 9:37 am, Feb 28, 2025 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.02.27 16:42:57 - 09'00' Bo York (1248) X 10-407 AOGCC witnessed tag TOC. AOGCC witnessed MIT-T to 2500 psi post-cement plug. A.Dewhurst 10MAR25 MGR05MAR25 WCB 3-7-2025 DSR-2/28/25 X *&: 3/10/2025Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.03.10 16:05:03 -08'00' RBDMS JSB 031125 RST Res P&A Sundry Well: 06-12B & 06-12BL1 PTD: 211-115, 211-117 Well Name:06-12B & 06-12BL1 PTD 06-12B:211-115 PTD 06-12BL1:211-117 Current Status:Producer, Operable API 06-12B:50-029-20456-02-00 API 06-12BL1:50-029-20456-60-00 Estimated Start Date:3/24/2025 Estimated Duration:14 days Regulatory Contact:Carrie Janowski / Joe Lastufka 907-575-7336 First Call Engineer:Jerry Lau 907-360-6233 Second Call Engineer:Dave Bjork 907-440-0331 Current Bottom Hole Pressure:3175 psi @ 8,800’ TVD 7.1 PPGE Maximum expected BHP:3300 psi @ 8,800’ TVD 7.3 PPGE Max. Anticipated Surface Pressure:2420 psi (based on 0.1 psi/ft gas gradient) Last SI WHP:1975 psi (taken on 1/21/25) Min ID:1.90” @ 11,461’ MD Max Angle:104 deg @ 11,170’ MD Well History: 06-12 was drilled and completed in May 1980 as an Ivishak Z4 producer and yielded 7.1MMBO before being reservoir plug and abandoned. 06-12A rig sidetrack was drilled and completed in July 1992 as an Ivishak Z4 producer and yielded 3.1MMBO until being plug and abandoned. 06-12B was 06-12BL1 were drilled and completed in November 2011 as a CTD multilateral Sag producer with slotted liner, which yielded 0.69 MMBO throughout its life. The well target was a part of the Sag gas drive campaign that placed CTD laterals just south of the Sag gas cap enabling gas-drive pressure support to produce black oil through the relatively tight sag formation. Low oil rates were common over most its life mostly due to higher-than-expected water cuts inflowing via nearby faulting connected to the Ivishak. Justification for Reservoir P&A: 06-12B and 06-12BL1 production rates have become marginal with well test results averaging below 50 IOR for the last year. The Sag gas drive target is no longer economic, and no other viable targets can be reached from the existing wellbore without a sidetrack. Objectives: The intent of this program is to perform a reservoir P&A of both 06-12B and 06-12BL1 per 20 AAC 25.112 and cut TBG in preparation for a 2025 I-rig rotary sidetrack. The plan is to set a plug in CTD liner below TSGR, punch the CTD LNR above liner lap TOC, perform a cement squeeze with coil to ensure a greater than 200’ MD continuous lateral cement plug with its base below TSGR (top of pool). After a slickline TOC D&T and AOGCC witnessed pressure testing are complete, E-line will cut TBG below the planned I-rig KOP of ~3300’ MD. 907-575-7336 907-227-8496 RST Res P&A Sundry Well: 06-12B & 06-12BL1 PTD: 211-115, 211-117 Integrity: PPPOT-T to 5000 psi (passed on 1/11/25) PPPOT-IC to 3500 psi (passed on 1/12/25) MIT-T to 2731 psi (passed on 1/23/25) CMIT-TxIA to 2620 psi (passed on 1/23/25) Procedure: Slickline: Drift for Eline CIBP and punch. Eline: 1. Perform HES CBL/GR/CCL form 10,875’ to 10,500’. Send log to OE for confirmation prior to making up punches. 2. Punch 3-3/16’ liner from 10,845-10,850’ MD. Use punches that avoid penetrating the 7” 26# CSG. 3. Bullhead kill with 230 bbls of SW or 1% KCL followed by 38 bbls crude FP. Max pressure 2650 psi. 4. Set CIBP @ 10,855’ MD. 5. Perform injectivity test to 1200 psi with crude to determine LLR down liner lap. Expect minimal injectivity, if any. This is to verify that a liner lap leak won’t impact the subsequent CTU cement squeeze design. Coiled Tubing: 1. MIRU CTU 2. Perform coil flag logging run with GR/CCL. 3. If injectivity down the liner lap is unmanageable, then swap over the wellbore to DSL from TOL to surface. If manageable injectivity, then KCL/SW are adequate. 4. Set one-trip cement retainer at 10,650’ MD in middle of first full joint of 3-3/16” LNR below deployment sleeve. 5. Establish 1:1 returns with flowpath down CT, thru retainer, into punches with returns up liner lap to CT backside. 6. Volumetrically place 10 bbl (8.1 + 1.9 excess) cement plug inside 3-1/16” liner from retainer to punches and outside in 3-3/16” x 7” liner lap annulus from punches to TOL. Unsting, then lay in 2 bbls of cement from top of retainer. This will leave TOC at ~10,375’. 7. RDMO CT Cement Properties: Cement Type/weight: Class G 14-15.8 ppg Bottom hole temp: 205°F Fluid Loss: 20-200cc/30 min Thickening Time: Minimum 8 hours RST Res P&A Sundry Well: 06-12B & 06-12BL1 PTD: 211-115, 211-117 Cement Volumes: Through Retainer size cap top btm Length vol BPF MD MD MD BBLS ͒ϱ͒ϯ͕͐ГώƄώ͓ϱ͐ϯ͑Г ͏ϟ͏͏͔͓ ͐͏͕͏͒ ͐͏͕͑͒ ͑͏ ͏ϟ͐ ͒ϱ͒ϯ͕͐ГώƄώ͖Г ͏ϟ͏͓͑͗ ͐͏͕͑͒ ͐͏͔͗͏ ͖͑͑ ͕ϟ͓ ͒ϱ͒ϯ͕͐Г ͏ϟ͏͏͖͕ ͐͏͕͔͏ ͐͏͔͗͏ ͑͏͏ ͐ϟ͔ (ƄèôŜŜ ---ϱ͐ϟ͘ Total ---ϱ ͐͏ϟ͏ On top of Retainer size cap top btm Length vol BPF MD MD MD BBLS ͓ϱ͐ϯ͑Г ͏ϟ͏͔͐͑ ͐͏͔͏͏ ͐͏͕͏͒ ͐͏͒ ͐ϟ͕ ͒ϱ͒ϯ͕͐Г ͏ϟ͏͏͖͕ ͐͏͕͏͒ ͐͏͕͔͏ ͓͖ ͏ϟ͓ (ƄèôŜŜ ---ϱ͏ϟ͐ Total ---ϱ ͑ϟ͏ Slickline: 1. WOC 3 days, D&T TOC, MIT-T to 2500 psi target pressure –AOGCC Witnessed. 2. Pull SO from GLM ST#6, leave pocket open. 3. Drift for 4-1/2” E-line cutter to 4000’ Fullbore: 1. RU to circ out down TBG with IA returns to tanks. 2. Pump the following a. 2 bbl 60/40 b. 100 bbls of 160 deg Soapy Water c. 290 bbls of 1% KCL or SW d. 85 bbls of DSL e. S/I returns, U-tube for 30 min to spot DSL in IA. E-Line: 1. Jet cut 4-1/2” TBG at ~3425’ MD. Cut 2’ below a collar. Tie into jewelry with CCL. I-rig will be kicking out at ~3300’ MD. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS RECEIVED By Kayla Junke at 3:51 pm, Apr 10, 2023 1. Operations Susp Well Insp ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing 7 Operations shutdown ❑ Performed: Install Whipstock [l Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Mod Artificial Lift ❑ Perforate New Pool ❑ Repair Well ❑ Coiled Tubing Ops ❑ Other: Pre P&A ❑� 2. Operator Name 4. Well Class Before Work: 5. Permit to Drill Number: ConocoPhillips Alaska, Inc. Development ❑ Stratigraphic ❑ Exploratory ❑� Service ❑ 211-155 3. Address: P.O. Box 100360 6. API Number: Anchorage, AK 99510 50-103-20645-00-00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0025528, ADL355038 Nuna 1 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): NIA Oooguruk Field/ Torok Pool 11. Present Well Condition Summary: Total Depth measured 13840' feet Plugs measured 6910' feet true vertical 5162' feet Junk measured NIA feet Effective Depth measured 6621 feet Packer measured N/A feet true vertical 4687' feet true vertical N/A feet Casing Length Size MD TVD Burst Collapse Conductor 80, 16" 110, 110, Surface 4368' 10-3/4" 4403' 3299' Intermediate 7809' 7-5/8" 7840' 4996' Production Liner *Remaining completion left in hole Perforation depth Measured depth 8189-13744' Cemented True Vertical depth 5022-5164' Cemented Tubing (size, grade, measured and true vertical depth) None Packers and SSSV (type, measured and true vertical depth) None 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13a. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: I Well Remains Shut -In Subsequent to operation: 13b. Pools active after work: NIA 14. Attachments (required per 20 AAC 25.070, 25.071, s 25.263) 15. Well Class after work: Daily Report of Well Operations Exploratory Development ❑ Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑� SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Adam KlDigitally signed byAdam Klem KlemDate: Name and Date: 2023.04.1014:15:18 as'ao' Digital Signature with Date: Contact Name: Adam Klem Contact Email: adann Alem(a.conocoohillios.com Authorized Title: Staff RWO/CTD Engineer Contact Phone: (907) 263-4529 Sr Pet Eng: Sr Pet Geo: I ISr Res Eng: DSI RBDMS JSB 041123 Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov i Y Y 2 W F— <a aUZ Q 2C7Y Sat❑ U0 o WU WSZOLW F O?O 6� m_m � �� u)ZQ �ZLLQ rnQz0z �¢OfCL W aC7owZ N O W m W Y ¢ p a L Y Z w� 0 It -rn 2 o O m rn w❑ v» 0 Y O 00 W❑ z J> p n 2 QOLO LLZ F OONFO Faz2�FUz WC7C7�m�Y F0 LLJ00 o, LLp Z) v¢ip�0 F aao� ¢Q¢O❑za LLOF❑z❑o � d O a O 0 o0d J j J = r 0 Y rn Z z Z O 0 Q= 5 0 m J w= w U� mu)LL �❑ JLLFz�O'_H W �-2W Y❑rnmmFFQ000FJm>U ¢O ¢❑m Z Q NZLU W Ov >F pU UZUdaF WLL- zZLL0FZ w¢ L In ��� O W (DY>Z>o—2LL, J_ooDOLLof m<`O?w W>❑?=>�aa= �LL(/i�>Y > J� >�~LL'QU CA7J ZO)OQJ2 �F- LLZ¢U��IL Z W p LL m m O m w ❑ w a K W 0 N O F Q F O J W 2 m 0 2�¢ Y J J ❑ Y"' MK O U W Km YZ2YZ JF>a❑ W 0�U Cn Ui+)❑j2Od¢ inmm0tn❑ LL °fop OFZLLSS��X ZaJ¢U oc-�ow¢O�}eoOD ��OWOZ CO a Z W a J ❑ Q rn a 2 v_=i p U a z, m 0= U a o w LL, U� Y �"i ri rn m a 0 �LL W JS D Q¢Z W 2UZ� WJ= °��¢XU OOU¢W ZSJp�F-Z �O¢F m U) Q J LL m O W O LL~ LL Mcli M 0 W w 2 v a O¢ O m m> U p 02❑ ¢❑ OFoUO�❑ F'O�QM0a p0Uw X ¢ 0UODLL W WW oa pa❑ OpmN❑N2 =Q?�OO�F¢>� wOw p020 o7}WQ� Ow U W0 o HLLJ"0 W Z)Z ZW,Np❑ w ❑D2WY W W CZ a W OUU1WFQH w¢Um¢LLLLVZmJ=U >>MjUF->L-1 un 0 L rWFcm Q Z¢ OZ❑ E O LL OD W F- U W OLLJ 2¢ mp❑ LL(DO❑:wI— ❑mZJAmONZgF- LL cl) LL Op A7 ¢ W �rnO¢aWZrna J NU_—LL wWHmC0 _ LLwa(9YU¢0¢Fz H gWVuQ _ UO ZZN zj❑J mO 2 J Q 2 O � vi ,pww¢ =�am wJ¢N¢ZJJ ZU¢¢LL>LLp N 0 OFU FUSJCOFS LL W\�JJQ Z�wci>LL ZSdxw IL ZCO❑��>7 WWmm7F�� (7 m02—mO;FY LL �m WZ Y=zmm O>DO Yiz2oKco ZZ02 OQO ❑¢ a¢ w w m pOJ O❑ O O LL coVa m pWo OwF❑ z 2-L w w¢❑ mm❑m❑❑LL❑LLXw0 00ma0022ciUa5a0a -imIL0 F❑F rn»aa Q Q Q Q Q Q Q Q Q Q M M M O O O O O O O N N N N N N N N N C) M M Cl) M M M Cl) M Cl) M N N N N N N N N N N OD 0) CD OD W O N M N N N M Cl) O O O N N N O O O O O O O O O O ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z 0 Q z} U' 0 r � m of a z x ¢¢ zzzp p > �wWmw Zz Lu F-a'q Y w za 0 oxx of-- (1 D� O D mw?a�wZ z>0Z) HHll wQz ¢mY W m0 ZUO¢ JOZ U) Ow¢ W V)m 7200 ?J��x �Jmw�JtOuiW~O_LL M0—= m�ap U DZ WH��wAFn� W maHJ z w co< 0U3aooxU=('Lu wVw O pawCLM=2� U)¢2 0 U)-0 W'�~ xo O ¢0w cOJF ¢zzoszi0zo0OQz�aUF �w�wzmm WO -0U� aWz OLL FW ¢w W W UU)00 z~COLLO(aCp m a aJwW z W o =p�a0aow?�¢ �aZ<pmm�Ka 0=mU)OW Y Y 0¢O2z �W C) M:�oa<U)ww� ooW ro°o0OZ�L " mmo�DFCz 0`0 o�¢ iY?wOww -4) Dawz1 m LL ¢2aw0 v �vDOdW ooQ m0aLLwm ¢wlJV~ MooJ��O POW W �¢J w rO0'� ¢jr -¢x om UQo m aO LLCL JFJOO LL a Y O Q U) Y�� 00zmMw Mz M D FHd Z O LL J ¢ z ¢QF U Z > J 0W,Qa oWMm0U n Q� CL wHF-0N�wu)�WO �LLOF�ZzO0e7 a�oOwwWwU�O O0)� m J�m LLza�pU�mQWw=+ =^d OLU QJ ��U= px7no in a OOwaJ ¢ ' LL LL �0p�Qvz�2¢O 7�(DW�ZO Oz¢m�zZLLvOOZ W ¢=¢WOZ�m<�o01Umm w p Q WUv2 OWir (3z0U� -j o=2z7HO ¢�NwLL— wWmmmoO-2LLZCL m-oxmz0m0LLWama� pm>¢ UnL 0 0 z <wo0 00)LL NOofx Z Q Zz�awLU�oa�ovF-o�zZC�a mJm ¢urn MNw�<)�z=¢ LU =F�=FJ��x~°v~¢om� YQoWw�zW=¢Oa zoCj�H0W�¢�ow oa2o O�X¢ox -W ��0~z Zw O =W�m0U)N azLL ULL~C QZ=-mJ¢w~U)LL�wUZa -aZOOnHO�Q N�� LLW �O�2OmZg� La ~LU OU) <of wwOzZO7 0=WW axZOUO1�O2Z�MZ Wo o (nnQLLo h U w ox CC) CD -JZCD Jo�Jx0Qzxmrxw xmx0� OOJOOOLL0WLLo0 �0 it zxOp~ =OJ¢LL'¢O)FLL LL'LL LL'DLL LL^22DJ LL' OF LL O�Mm a OF¢ O LL m LL a:(nOF� 0 0 0 0 0 0 0 0 . .. .. .. to I 0 M M Cl) M M M M M N N N N N N N N (0Ico 0)N m O O O O O N N N N N N N N N N N O o O O O O O O ¢ ¢ a a a a ¢ ¢ ¢ Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z F H �. c/) Z w O W Q Oar + 0� H� F m oC7 a a W (gyp U) �Q (°+) V CD d(A (a0 W Z ;X `° cOi Ua o ?i O m x U~ H in Yw x� z w 0 m o m 3 m m N Q c Z o c v_ F zw Om0 LLD 0- Uz W (D(D �LL O b u cu o o w 0Li Y ao._ ° capL ¢? m0Q���Hmaz F— apU� �} �H ui ° nN o FOa(7ox�aacn zQ xF0��O m m o Ja co C) c amM_ mao O m x O r- a 0= W 0 Z} W p r 06 a t Y LL O w " °o c a a) 0) W a o 0 0 3 O� 2pP�m�F Zm ZO> Z-U) m � �a U 3 o ox as ° N �nso o � o�0 J Z m Y U- m O p F a Cl) LLi - O z o d N d c s 0 0 0— 0 N= O Z J MQ� Q a m w O U m 0 pLL Y o U o o LL J w o N o_o ca c o� _rn -° F YO aH�C7U(j) LO Z)aa LLW�a @O 00 5 Qo a ° cv mAQ 0 °v�jo of 2QH¢V 2 LLr LLa°S' V O�J wF- W O c/) N Ocn (6 NY a7 .�.+ CND a)M� OZ wO��C) < -D W cnom0 WQ Jim W � w � OF � 3'�IL 0) M 0 0HZQ Qm0w woQ Udza am o a am �°c�L U d) Noa >�z wo >Ou�F- W wnz� Jm0 �m00 m� ° C� aa) 3 o ai-=U) o.w Y w U F F W a Q Z Q J o p N w $ w ~ o> d o o W m U¢ U) ENO m� p 3 a xLL�0 w2 J 0CL JQ 0 W OF O c O O'O O >Q U 6 0 0Q O O ZU am �2mp U Q W m2 H rnt (a 0'Q-o as OH C7 N W Q LL'�LL' w W � H W p_ mQ m "7 Z 1) O N- c O_ rnE(9 '- �� YF W 000QI W am cC l/)Ocn (O 06 ~`� QU W O .� Ol a) c N O c O o(D Oa. mo �((0W- LL ¢w�a Ia0OONmm �m ZO m o m nc00s n2 > ` � E o " o a ° N� W aiaLLH nUZzU 0�mw0�a� W a aoJ nU On m�? W,iE 3tiaM 3 ) LL� ��Ouxicooa� WgLL �w W aQ2LU 2z 0a �U npv o 3 dL ( - ago 2m 3@1� OO O� 7xJ2 2xaFpO W U)0H~UU) OCL r U W NLL a3 a„� - rn° ov cam= Nm�-v(Nn O-MOOH-wZa F¢JO 0 o Fm N} m O c m a> N CL 2 w =~ � c W �LL�0�00o(7� 0H0CLz0 W CD0 �Z UQ �tf E m ma` 0), o o m co c W m vi CO Uzzz awm �� ¢ �w c ds N `mom -oU nov 30 OQw W y W-j-Z JZFn Za-<-M OU' w U))F rn W LLw (D m a) c E Eo i o0'' mci 0 CD z00Uaa0wai11 Zm&o (`�wvwi��ww H QQ Za °Ho0m acid CL o�Q CL w �zZm0M0:i =00� ('Z� aa�amzUJ w¢ O�inO0 ya 3 E o �N ° 5 =o^ �zz E w-l/)Z2 H0JaQJ wg ¢Y p Fa ~O UU c d a NUd N oo a 0) .0 o x w 0-1 2~ m O U Q w a a 00 a 0 z w a Q H co ?¢ w m Z p o o m cr a6 rn rn m o Q m o N m m CO co f..)� (i f..)� �pQp OLL' ¢ 4's a....J ....2 U) a zi m(O_ �J la fn a) (a ELL'LL' O.a_ F 0_a ZZ.� ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ O O O O O O M O O O O O O LO O I O O O CD, O M M M Cl) Cl) M M M Cl) M N N N N N N N N N N V W) (O 1� a0 N (O I— oD N N N N N O O o O O N N N N N M M Cl) Cl) Cl) O O o O O O O O O O Q Q Q Q Q Q Q Q Q Q Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z o o a CL C 3 m C r N d N> o> 0 d o CL a> @ oY Y °— o m m >\ L m c a U Y �• 3 C x N Y Cl) m 3 y m 0 v U a O 0 E ono 0 c z m- `opt cu CL co_'�c) o0 w (� nN O_l6 O (O rn m O c —~ N O CL 0 ai .O 'C a 0 0 4 Q 2 x (O � 'O L D > 3 M N LL N m— LL N_ b m (o O O) O 0 w o� 4) CL E o) 0 w� a ac �� 4) ~m EF d a� (D ca m E a a� ° 0 c n �U x � 0 ma o .N Mm Z a 01m o m Co 00 30'� V 0 O m, o �2'r- c Co x m —cp Y Ia cLia o04 N o f >—mm N -O Z xcm0 �.O<M F °Dm0UL a C mx 01 !' n_ LLLL 'm6� .'9 0 0. c w O C a 0) ^ 0 In m o c 3 O in 0 Q M .m„ m o U x C y m U OZ06 II -= NZ a 4) F V F—'T D d N t; 0 c O F N (6 C N # V N O N 3 0 d L N C, O CJ m E y m N Q m .. N N O IA W Q C 0_ VJ = U 3@ CD In a N (7 N C` C O V 'd F m d C 2 i6 0 COoa) H c c o 5 ° n 0- O a o ID 'u J m N �o c'EYM E 0 OIL/1CN—� dZN m� m U N l6 EO CL NM a c V d @ (D = m t m Oa — N C LL J N � �\ V E U m C� � N m 0 � w 0 mn = (D o �� ("i E 0a x o o _ 3 O m 0 v d� m" Y � m p a w cu CL (i c o N N N 3 N 3 c y N O Q 0 o V N O p_ O) r w 0) O y0 ` N (NO OD C a' C x 2 �_ m >. (0 m L CL d N d a � � T — U) � a) cm LO a) t` 2� d - 0 22� a) � m a� as CL `oZNo� U) c r 3 a� U'a 0 3LL _ O cFamai mM my 0= ccaU� 0 0 3c o?>� 3v04 c#r 3U a� c w N Co co O C N d i0 l6 VJ N > x d? a' O. m f0 x N C f0 @ C O F VJ (n i..) 0_ a C p 0 d) LL U d U Q Q Q Q O O O O O O O O N N N N M M Cl) M N N N N M O O N Cl) O Cl) O Cl) O M O Q Q Q Q Z Z Z Z z z 7 z Z Z Z Z Nuna 1 Proposed Suspended Completion -Actual Depths COMPLETION INFO MD ft RKB TVD ft RKB OD in Nom. ID in Weight IbKt Grade Thread to Thread btm Conductor 110 110 161 15.06 Welded Welded Surface 4403 3299 10.75 9.95 45.5 L80 BTC BTC Production/ Intermediate 7840 4996 7.625 6.875 29.7 L80 BTCM BTCM Conductor Surface Casing Top Coyote: 5607' MD Bottom Coyote: 5755' MD TOC tagged at 6621' MD CIBP (^6910' MD) Jet Cut, assumed hole in 7-5/8" (-6960' MD) 7-5/8" Production Casing C and A -sand perfs 7-5/8" Production Casing 4.5" Liner (P&A'd) PROPOSED COMPLETION 4.5" Completion REMOVED Install two 4-1/16" Gate Valves (Freeze Protect as needed on POOH pulling 3.5" out of hole.) Cement CIBP REMAINING COMPLETION LEFT IN HOLE P&A'd lower Kuparuk (Already done.) RST Res P&A Sundry Well: 06-12B & 06-12BL1 PTD: 211-115, 211-117 Current Wellbore Schematic RST Res P&A Sundry Well: 06-12B & 06-12BL1 PTD: 211-115, 211-117 Proposed Reservoir P&A with TBG cut, TBG punch, DPZ detail, and cement detail included RST Res P&A Sundry Well: 06-12B & 06-12BL1 PTD: 211-115, 211-117 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Operations Manager Date Operations Engineer Date Sundry Application Well Name______________________________ (PTD _________; Sundry _________) Plug for Re-drill Well Workflow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of "Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and initial it on the Form 10-403. Geologist 2 If the “Abandon” box is checked in Box 15 (Well Status after proposed work) the initial reviewer will cross out that checkbox and instead, check the "Suspended" box and initial those changes. Geologist The drilling engineer will serve as quality control for steps 1 and 2. Petroleum Engineer (QC) 3 When the RA2 receives a Form 10-403 with a check in the "Plug for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." Research Analyst 2 4 When the RA2 receives Form 10-407, they will check the History tab in RBDMS for the IPBRD code. If IPBRD is present and there is no evidence that a subsequent re-drill has been completed, the RA2 will assign a status of SUSPENDED to the well bore in RBDMS. The RA2 will update the status on the 10-407 form to SUSPENDED, and date and initial this change. If the RA2 does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. Research Analyst 2 5 When the Form 10-407 for the redrill is received, the RA2 will change the original well's status from SUSPENDED to ABANDONED. Research Analyst 2 6 The first week of every January and July, the RA2 and a Geologist or Reservoir Engineer will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all Plug for Redrill sundried wells have been updated to reflect current status. At this same time, they will also review the list of suspended wells for accuracy and assign expiration dates as needed. Research Analyst 2 Geologist or Reservoir Engineer A.Dewhurst 10MAR25 A.Dewhurst 10MAR25 1'1 o c g a ,- coCV 9 ca 3 co IN f6cop'LJO aZ10 a -6 —a :0N1-6 Ti 0 'O CO C I1.. �O0 CD o X iIN yf �tO EI.9 ce 0 f0 - m O O a 2 1 4- 0 U N = >0 y z 5o Oa 2 F- 2 • i !r Q m o c p j • 211 -H5 • Letter of Transmittal r' u BAKER Date: February 21, 2012 HUGHES To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Bill Michaelson Please find enclosed the directional survey data for the following well(s): U-12AL1 2_\\-\°1 M-17AL1PB1 M-17AL1RECEIVED P-01APB 1 P-01APB2 P-01APB3 P-01A \t-\\ FEB 2 3 2012 106-12B 06-12BL1 Zai-\\51 2\\-\\-I W-21AL1 W-21AL1-01 p� 2,12G3 AOGCC 211 13� 2\\- k 3�- Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: I� , State of Alaska AOGCC DATE: Z1- 15 • EMI BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 06 06-12 - Slot 12 06-12B RECEIVED FEB 2 3 2012 Survey: MWD AOGCC Survey Report - Geographic 08 December, 2011 KAU BAKER ,,... „. b _ HUGHES • Survey •Report- Geographic • INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-12-Slot 12 Project: Prudhoe Bay TVD Reference: 19: 12 7/7/1992 00:00 @ 68.00ft(generic drilling Site: PB DS 06 MD Reference: 19: 12 7/7/1992 00:00 @ 68.00ft(generic drilling Well: 06-12 North Reference: True Wellbore: 06-12B Survey Calculation Method: Minimum Curvature Design: 06-12B Database: EDM .16-ANC Prod-WH24P Project Prudhoe Bay,GPB, PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 06,TR-10-14 Site Position: Northing: 5,941,880.59 ft Latitude: 70° 14'46.529 N From: Map Easting: 684,674.88 ft Longitude: 148°30'29.224 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.40 ° Well 06-12 API No 500292045600 Well Position +NI-S 0.00 ft Northing: 5,940,585.42 ft Latitude: 70° 14'33.638 N +El-W 0.00 ft Easting: 685,317.83 ft Longitude: 148°30' 11.460 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00 ft Wellbore 06-12B API No 500292045602 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2011 11/25/2011 21.34 80.99 57,664 Design 06-12B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,845.87 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 31.00 0.00 0.00 214.27 Survey Program Date: 12/8/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 10,800.10 06-12A GYD-CT-CMS Gyrodata(06-12A) GYD-CT-CMS Gyrodata cont.casing m/s 10,800.10 10,845.87 06-12A MWD Sperry(06-12A) MWD MWD-Standard 10,861.00 12,975.00 MWD(06-12B) MWD MWD-Standard 12/8/2011 10:31:27AM Page 2 COMPASS 2003.16 Build 73 «abAKEit bpHUGHES Survey Report- Geographic f INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-12-Slot 12 Project: Prudhoe Bay TVD Reference: 19: 12 7/7/1992 00:00 @ 68.00ft(generic drilling Site: PB DS 06 MD Reference: 19: 12 7/7/1992 00:00 @ 68.00ft(generic drilling Well: 06-12 North Reference: True Wellbore: 06-12B Survey Calculation Method: Minimum Curvature Design: 06-12B Database: EDM .16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,845.87 38.60 208.65 8,764.18 -4,203.13 -2,237.90 5,936,328.80 683,184.07 70° 13'52.297 N 148°31' 16.483 W TIP 10,861.00 38.36 208.20 8,776.02 -4,211.41 -2,242.38 5,936,320.41 683,179.80 70° 13'52.216 N 148°31'16.613 W KOP 10,885.49 41.13 208.50 8,794.85 -4,225.18 -2,249.82 5,936,306.46 683,172.70 70° 13'52.080 N 148°31'16.829 W 10,900.85 47.43 208.75 8,805.84 -4,234.59 -2,254.95 5,936,296.93 683,167.80 70° 13'51.988 N 148°31'16.978 W 10,930.55 60.01 209.00 8,823.38 -4,255.51 -2,266.49 5,936,275.73 683,156.77 70° 13'51.782 N 148°31'17.313 W 10,960.83 71.92 209.31 8,835.69 -4,279.62 -2,279.95 5,936,251.30 683,143.92 70° 13'51.545 N 148°31' 17.704 W 10,990.39 84.04 207.03 8,841.84 -4,305.06 -2,293.56 5,936,225.53 683,130.94 70° 13'51.294 N 148°31'18.099 W 11,020.11 89.23 207.31 8,843.58 -4,331.45 -2,307.10 5,936,198.82 683,118.05 70° 13'51.035 N 148°31'18.493 W 11,050.15 93.38 207.50 8,842.90 -4,358.11 -2,320.92 5,936,171.84 683,104.89 70° 13'50.773 N 148°31'18.894 W 11,080.07 97.51 207.80 8,840.06 -4,384.48 -2,334.74 5,936,145.13 683,091.72 70° 13'50.513 N 148°31' 19.295 W 11,110.08 101.80 207.36 8,835.03 -4,410.70 -2,348.43 5,936,118.59 683,078.68 70° 13'50.255 N 148°31'19.693 W 11,140.06 102.96 210.77 8,828.60 -4,436.29 -2,362.66 5,936,092.65 683,065.09 70° 13'50.004 N 148°31'20.106 W 11,170.12 103.81 215.45 8,821.63 -4,460.78 -2,378.62 5,936,067.78 683,049.73 70° 13'49.763 N 148°31'20.570 W 11,200.13 102.17 218.63 8,814.89 -4,484.12 -2,396.24 5,936,044.02 683,032.70 70° 13'49.533 N 148°31'21.081 W 11,231.21 102.12 221.46 8,808.35 -4,507.37 -2,415.78 5,936,020.29 683,013.73 70° 13'49.304 N 148°31'21.649 W 11,260.83 101.62 225.91 8,802.25 -4,528.33 -2,435.80 5,935,998.85 682,994.24 70° 13'49.098 N 148°31'22.230 W 11,290.14 101.43 229.28 8,796.39 -4,547.69 -2,457.00 5,935,978.97 682,973.52 70° 13'48.908 N 148°31'22.846 W 11,320.12 99.81 232.56 8,790.87 -4,566.26 -2,479.87 5,935,959.85 682,951.11 70° 13'48.725 N 148°31'23.510 W 11,350.22 98.41 235.39 8,786.10 -4,583.74 -2,503.91 5,935,941.79 682,927.52 70° 13'48.553 N 148°31'24.208 W 11,380.50 95.23 235.88 8,782.51 -4,600.71 -2,528.72 5,935,924.21 682,903.13 70° 13'48.386 N 148°31'24.929 W 11,410.41 91.20 236.05 8,780.83 -4,617.42 -2,553.47 5,935,906.90 682,878.80 70° 13'48.222 N 148°31'25.648 W 11,440.47 93.07 235.83 8,779.71 -4,634.24 -2,578.35 5,935,889.47 682,854.34 70° 13'48.056 N 148°31'26.371 W 11,460.59 95.38 235.44 8,778.23 -4,645.57 -2,594.91 5,935,877.74 682,838.06 70° 13'47.945 N 148°31'26.852 W 11,480.72 97.36 234.97 8,775.99 -4,656.98 -2,611.34 5,935,865.93 682,821.92 70° 13'47.832 N 148°31'27.329 W 11,510.58 93.74 236.60 8,773.11 -4,673.69 -2,635.91 5,935,848.62 682,797.77 70° 13'47.668 N 148°31'28.043 W 11,535.00 90.95 237.93 8,772.11 -4,686.88 -2,656.43 5,935,834.93 682,777.58 70° 13'47.538 N 148°31'28.639 W 2 7/8" 11,540.62 90.31 238.23 8,772.04 -4,689.85 -2,661.20 5,935,831.84 682,772.89 70° 13'47.509 N 148°31'28.777 W 11,571.56 86.41 235.59 8,772.93 -4,706.73 -2,687.11 5,935,814.33 682,747.41 70° 13'47.343 N 148°31'29.530 W 11,600.69 85.80 234.35 8,774.91 -4,723.42 -2,710.91 5,935,797.07 682,724.03 70° 13'47.179 N 148°31'30.221 W 11,630.69 89.26 236.00 8,776.20 -4,740.53 -2,735.51 5,935,779.36 682,699.86 70° 13'47.010 N 148°31'30.936 W 11,660.77 89.85 240.72 8,776.44 -4,756.30 -2,761.11 5,935,762.96 682,674.65 70° 13'46.855 N 148°31'31.679 W 11,691.03 88.99 244.95 8,776.74 -4,770.11 -2,788.02 5,935,748.50 682,648.09 70° 13'46.719 N 148°31'32.461 W 11,721.42 88.65 250.05 8,777.37 -4,781.74 -2,816.08 5,935,736.19 682,620.32 70° 13'46.605 N 148°31'33.276 W 11,751.20 89.08 254.02 8,777.96 -4,790.92 -2,844.40 5,935,726.31 682,592.24 70° 13'46.514 N 148°31'34.099 W 11,785.42 87.55 259.84 8,778.97 -4,798.65 -2,877.70 5,935,717.76 682,559.14 70° 13'46.438 N 148°31'35.066 W 11,813.59 87.02 264.32 8,780.30 -4,802.53 -2,905.57 5,935,713.20 682,531.38 70° 13'46.400 N 148°31'35.876 W 11,845.51 87.49 261.88 8,781.83 -4,806.36 -2,937.22 5,935,708.60 682,499.84 70° 13'46.362 N 148°31'36.795 W 11,878.37 89.85 257.87 8,782.59 -4,812.13 -2,969.55 5,935,702.03 682,467.66 70° 13'46.305 N 148°31'37.735 W 11,903.03 91.13 254.87 8,782.38 -4,817.94 -2,993.51 5,935,695.63 682,443.85 70° 13'46.248 N 148°31'38.431 W 11,930.70 92.21 250.67 8,781.57 -4,826.13 -3,019.92 5,935,686.80 682,417.65 70° 13'46.167 N 148°31'39.198 W 11,960.64 92.21 246.05 8,780.42 -4,837.16 -3,047.72 5,935,675.09 682,390.13 70° 13'46.059 N 148°31'40.005 W 11,990.88 92.12 240.82 8,779.28 -4,850.67 -3,074.74 5,935,660.92 682,363.46 70° 13'45.926 N 148°31'40.790 W 12,020.83 92.39 236.54 8,778.10 -4,866.22 -3,100.30 5,935,644.74 682,338.29 70° 13'45.773 N 148°31'41.533 W 12,050.69 91.63 232.67 8,777.05 -4,883.51 -3,124.62 5,935,626.87 682,314.40 70° 13'45.603 N 148°31'42.239 W 12,080.81 91.41 237.66 8,776.25 -4,900.70 -3,149.33 5,935,609.08 682,290.13 70° 13'45.433 N 148°31'42.957 W 12,110.99 90.25 242.23 8,775.81 -4,915.81 -3,175.44 5,935,593.33 682,264.39 70° 13'45.285 N 148°31'43.715 W 12,140.98 89.85 247.07 8,775.79 -4,928.64 -3,202.53 5,935,579.83 682,237.63 70° 13'45.158 N 148°31'44.502 W 12,170.84 89.36 251.64 8,775.99 -4,939.17 -3,230.47 5,935,568.63 682,209.96 70° 13'45.055 N 148°31'45.314 W 12,200.82 89.36 256.48 8,776.33 -4,947.40 -3,259.28 5,935,559.69 682,181.36 70° 13'44.974 N 148°31'46.151 W 12,231.29 88.47 260.15 8,776.90 -4,953.57 -3,289.11 5,935,552.79 682,151.69 70° 13'44.913 N 148°31'47.017 W 12,258.51 88.01 264.52 8,777.74 -4,957.20 -3,316.07 5,935,548.50 682,124.83 70° 13'44.877 N 148°31'47.800 W 12,291.20 88.71 268.88 8,778.68 -4,959.08 -3,348.68 5,935,545.82 682,092.28 70° 13'44.858 N 148°31'48.748 W 12/8/2011 10:31:27AM Page 3 COMPASS 2003.16 Build 73 NMEr Survey Report Geographic • 0 b - BAKER • INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-12-Slot 12 Project: Prudhoe Bay TVD Reference: 19: 12 7/7/1992 00:00 @ 68.00ft(generic drilling Site: PB DS 06 MD Reference: 19: 12 7/7/1992 00:00 @ 68.00ft(generic drilling Well: 06-12 North Reference: True Wellbore: 06-12B Survey Calculation Method: Minimum Curvature Design: 06-12B Database: EDM .16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 12,321.40 87.36 273.23 8,779.71 -4,958.52 -3,378.85 5,935,545.63 682,062.10 70° 13'44.864 N 148°31'49.624 W I 12,350.63 88.34 277.58 8,780.81 -4,955.77 -3,407.92 5,935,547.67 682,032.97 70° 13'44.891 N 148°31'50.469 W I 12,380.81 92.92 278.77 8,780.48 -4,951.48 -3,437.79 5,935,551.22 682,003.02 70° 13'44.933 N 148°31'51.337 W I 12,411.48 94.30 284.00 8,778.55 -4,945.44 -3,467.78 5,935,556.52 681,972.88 70° 13'44.992 N 148°31'52.208 W I 12,440.90 94.30 288.38 8,776.34 -4,937.26 -3,495.95 5,935,564.00 681,944.53 70° 13'45.072 N 148°31'53.027 W 12,470.78 93.07 286.10 8,774.42 -4,928.43 -3,524.43 5,935,572.14 681,915.84 70° 13'45.159 N 148°31'53.854 W 12,500.67 91.53 282.12 8,773.22 -4,921.15 -3,553.38 5,935,578.70 681,886.72 70° 13'45.230 N 148°31'54.696 W 12,535.17 89.72 278.69 8,772.84 -4,914.92 -3,587.31 5,935,584.09 681,852.65 70° 13'45.292 N 148°31'55.681 W 12,561.11 89.88 274.62 8,772.93 -4,911.91 -3,613.07 5,935,586.46 681,826.83 70° 13'45.321 N 148°31'56.430 W 12,590.88 89.60 270.89 8,773.07 -4,910.48 -3,642.80 5,935,587.16 681,797.07 70° 13'45.335 N 148°31'57.293 W 12,620.80 89.91 266.18 8,773.20 -4,911.25 -3,672.70 5,935,585.66 681,767.20 70° 13'45.327 N 148°31'58.162 W 12,650.98 90.15 262.11 8,773.18 -4,914.33 -3,702.72 5,935,581.85 681,737.27 70° 13'45.297 N 148°31'59.034 W 12,680.96 89.91 257.70 8,773.16 -4,919.58 -3,732.22 5,935,575.87 681,707.90 70° 13'45.245 N 148°31'59.891 W 12,711.15 90.31 253.37 8,773.11 -4,927.12 -3,761.45 5,935,567.62 681,678.87 70° 13'45.171 N 148°32'0.740 W 12,739.23 90.12 249.40 8,773.00 -4,936.08 -3,788.06 5,935,558.00 681,652.50 70° 13'45.082 N 148°32'1.513 W 12,774.37 88.99 244.62 8,773.27 -4,949.80 -3,820.39 5,935,543.49 681,620.51 70° 13'44.947 N 148°32'2.452 W 12,804.46 89.23 240.28 8,773.74 -4,963.71 -3,847.06 5,935,528.93 681,594.19 70° 13'44.810 N 148°32'3.227 W 12,834.32 89.51 243.06 8,774.07 -4,977.88 -3,873.34 5,935,514.12 681,568.27 70° 13'44.671 N 148°32'3.990 W 12,864.38 89.26 247.25 8,774.39 -4,990.51 -3,900.61 5,935,500.83 681,541.32 70° 13'44.547 N 148°32'4.782 W 12,894.21 89.32 251.40 8,774.76 -5,001.04 -3,928.51 5,935,489.62 681,513.69 70° 13'44.443 N 148°32'5.593 W 12,924.17 89.79 255.33 8,775.00 -5,009.61 -3,957.21 5,935,480.34 681,485.21 70° 13'44.358 N 148°32'6.427 W 12,975.00 89.79 255.33 8,775.18 -5,022.48 -4,006.38 5,935,466.27 681,436.37 70° 13'44.232 N 148°32'7.855 W TD-2 3/8" 12/8/2011 10:31:27AM Page 4 COMPASS 2003.16 Build 73 ' '.CEIVED STATE OF ALASKA OECQ11 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT"°iANDDLOaCm.COmmissiat$ la. Well Status: ® Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 1b. Well Class:Art4114fntt 20MC 25.105 20AAC 25.110 ® Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One 0 Service 0 Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Abend.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 12/1/2011 211-115 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 11/10/2011 50-029-20456-02-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 11/18/2011 PBU 06-12B 2'FSL, 1679'FEL, SEC.02,T1ON, R14E, UM 8. KB(ft above MSL): 68' 15.Field/Pool(s): Top of Productive Horizon: 4192' FNL, 3917'FEL, SEC. 11,T1ON, R14E, UM GL(ft above MSL): Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 5020' FNL,412'FEL, SEC. 10,T1ON, R14E, UM 12975' 8,775' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 685318 y- 5940584 Zone- ASP4 12975' 8,775' ADL 028311 &028312 TPI: x- 683188 y- 5936337 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 681434 y- 5935466 Zone- ASP4 None 18. Directional Survey: ® Yes ❑No ' 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD Dir, GR, RES, GR, RES, DEN, NEU, CAL, MICRO-RES 10856' 8772' 23. CASING,LINER AND CEMENTING CORD SETTING DEPTH MD,SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 20" Conductor H-40 ,Surface 73' Surface 73' 30" 281 sx Arcticset II 13-3/8" 72# N-80 Surface 2708' Surface 2708' 17-1/2" 2000 sx Fondu.400 sx Arcticset II 9-5/8" 47# L-80 Surface 9696' Surface 7920' 12-1/4" 500 sx Class'G',300 sx Arcticset I 7" 26# L-80/13cr 9440' 10856' 7724' 8772' 8-1/2" 2667 sx Class'G' f3-3/16" 6.2# L-80 , 10604' 11533' 8582' , 8772' 4-1/8" 48 sx Class'G' 2-3/8" 4.43# L-80 11587' 12787' 8774' Q773' 3" Uncemented Slotted Liner / 24. Open to production or injection? IN Yes 0 No 25. 'TUBING RECORD If Yes,list each interval open (MD+TVD of Top&Bottom;Perforation Size and Number): SIZE DEPTH SET(MD) PACKER SET(MD/ND) 2-3/8"Slotted Section 4-1/2", 12.6#, 13Cr 10645' 10587'/8570' MD TVD MD TVD 11608'-12089' 8775'-8776' 26. ACID,FRACTli1RE,CEMENT SQUEEZE,ETC. 12091'-12786' 8776'-8773' E1'i 'R; p DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED it t 2500' Freeze Protect with 45 bbl's of Diesel S 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): December 23,2011 Gas Lift Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 12/23/2011 6 Test Period 4 215 397 591 128 64ths 1847 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 1020 1100 24-Hour Rate 4 860 1588 2363 Not Available 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? 0 Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RBDMS DEC 3 0 201 Form 10-407 Revised 12/2009 CONTINUED ON REVERSE ubmit Original Only 6 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. E nIATION TESTS NAME MD ND Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Kicked Off in Shublik None Top of Sag River(from 06-12A) 10830' 8752' Top of Shublik(inverted) 11383' 8782' /Base of Sag River Formation at Total Depth(Name): Sag River(entered from Base) 11383' 8782' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. 247.43 [ 1( Signed: Terrie Hubble� 1:1)i)..66&/ Title: Drilling Technologist Date: f PBU 06-128 211-115 Prepared ByName/Number. Terrie Hubble, 564-4628 Well Number Permit No./Approval No. Drilling Engineer: Matt Ross, 564-5782 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift, Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/6/2011 12:00 - 00:00 12.00 MOB P PRE MOB RIG FROM DS 18 TO DS 06. 11/7/2011 00:00 - 01:00 1.00 MOB P PRE MOB RIG FROM DS 18 TO DS 06. RIG ON LOCATION AND SPOTTED OFF TO SIDE OF PAD AT 0100 HRS. GIVE AOGCC 24 HR NOTICE OF BOPE TEST AT 11/07/2011 AT 0645 HRS. 01:00 - 06:00 5.00 MOB N WAIT PRE RIG MAINTENANCE WHILE WAITING ON PAD PREP. FINISH POST MOVE CHECK LIST. 06:00 - 14:00 8.00 MOB N WAIT PRE RIG MAINTENANCE WHILE WAITING ON PAD PREP. CONTINUE TO BLEED WELL TO 0 PSI. 14:00 - 17:00 3.00 MOB N WAIT PRE RIG MAINTENANCE WHILE WAITING ON PAD PREP. PREP PAD AROUND WELL.LEVEL ETC. 17:00 - 20:00 3.00 MOB P PRE SPOT RIG MATS AROUND WELL. SPOT RIG OVER WELL 06-12.ALL PRESSURE 0 PSI. RIG OVER WELL. SHIM AND LEVEL RIG. RIG ACCEPTED AT 20:00 HRS. 20:00 - 00:00 4.00 BOPSUR P WEXIT R/U EQUIPMENT AROUND RIG. R/U 7-1/16"BOP STACK. BOPE CONFIGURED AS:ANNULAR, DBL GATE WITH BLIND/SHEARS AND 2-3/8"PIPE/SLIPS, MUD CROSS, DBL GATE WITH 2-3/8"X 3-1/2" VBR'S AND 2-3/8"PIPE/SLIPS,AND CROSSED OVER TO TOP OF SWAB VALVE. INSPECT TQ OF TREE BOLTS. 11/8/2011 00:00 - 03:30 3.50 BOPSUR P WEXIT FINISH NJU BOPE AND CHECKING TQ ON TREE. R/U LUBRICATOR. SHELL TEST BOP TO 4500 PSI.GOOD TEST. 03:30 - 04:00 0.50 BOPSUR P WEXIT HOLD PRE-SPUD WITH NIGHT CREW. 0315 HRS-NOTIFY AOGCC FOR UPCOMING BOP TEST. CHUCK SHEVE IS IN ROUTE TO WITNESS BOP TEST. 04:00 - 12:00 8.00 BOPSUR P WEXIT TEST BOPS TESTING BOPS TO 250 PSI LOW AND 3500 go-p PSI HIGH. TEST WITNESSED BY CHUCK SHEVE,WSL, AND TOUR PUSHER. 12:00 - 16:00 4.00 BOPSUR P WEXIT INSTALL BHI CABLE HEAD. FILL REEL AND PT INNER REEL VALVE AND CT STRIPPER,GOOD. INSTALL BHI CHECK VALVES AND PT,GOOD. 16:00 - 20:00 4.00 BOPSUR P WEXIT R/U DSM LUBRICATOR AND PRESSURE TEST. PULL TWC WITH NO PRESSURE FROM BELOW. L/D LUBRICATOR OPEN WELL AND MONITOR.STATIC FOUND FLOW BACK TANK HARDLINE PLUGGED. Printed 12/27/2011 12:38:36PM .orth America-ALASKA- BP Page 2 of 21 Operation Summary Report _ Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 20:30 0.50 STMILL P WEXIT PUMP SLACK FORWARD. WORK ON FIXING HARDLINE TO FLOW BACK TANK. MONITOR WELL.STATIC 20:30 - 21:00 0.50 STMILL N RREP WEXIT FINISH REPAIR OF HARDLINE TO FLOW BACK TANK. FILL HARDLINE WITH METHONAL AND PRESSURE TEST TO 4000 PSI. GOOD TEST. MONITOR WELL STATIC. 21:00 - 21:30 0.50 STMILL P WEXIT HOLD UNANNOUNCED RIG EVAC DRILL AAR REVELED THE NEED FOR A EVAC POINT ON DRILLERS SIDE OF RIG. 21:30 - 22:30 1.00 STMILL P WEXIT PJSM FOR P/U WINDOW MILL BHA. R/U SAFETY JOINT AND P/U BHA. BHA TO 121.79' M/U QTS AND TEST. 22:30 - 00:00 1.50 STMILL P WEXIT RIH AT 100 FT/HR. 11/9/2011 00:00 - 01:00 1.00 STMILL P WEXIT RIH TO 5000' BRING PUMPS ONLINE TO DISPLACE FREEZE PROTECTION. PUMP AT 1.4 BPM AND 630 PSI MW IN AT 8.46 PPG AND OUT AT 7.64 PPG () P.c TAKE 84 BBLS TO FLOW BACK TANK. 01:00 - 04:15 3.25 STMILL P WEXIT CLOSE EDC AND RIH .30 BPM WITH 238 PSI. TIE IN. LOG FROM 10450'TO 10795' CORRECTION OF-27' • RIH FROM 10767'TO TAG OF 10856' 04:15 - 06:00 1.75 STMILL P WEXIT MILL AHEAD FROM 10853' DISPLACE TO MILLING FLUID WHILE DRILLING AHEAD.MUD IS AT BIT. RATE OF 2.5 BPM-1780 PSI,OFF BOTTOM AND 1900 PSI ON BOTTOM. Q ECD OF 8.91 PPG,WOB OF 0.26K DRILL 1.42- AHEAD TO 10867'MOTOR STALL. P/U BRING ON PUMPS TO 2.51 BPM 2090 PSI BEGIN TIME DRILLING-100 PSI OF MOTOR WORK. 06:00 - 08:30 2.50 STMILL P WEXIT TAKE 7 STALLS GETTING STARTED. REDUCE ROP TO 0.05 FT/6 MIN. 08:30 - 09:20 0.83 STMILL P WEXIT CONTINUE TIME MILLING WINDOW. STALL AT 10868.2 FT. PICK UP AND RESUME ROP AT 0.05 FT/6 MIN. 09:20 - 10:00 0.67 STMILL P WEXIT 10868.1 FT 2.51/2.53 BPM @ 2270 PSI DWOB=0.31K. 10:00 - 11:00 1.00 STMILL P WEXIT MILLING AT 10868.35 FT. 2.50/2.51 BPM @ 2300 PSI. DWOB=0.65K. ECD=9.85 PPG. 11:00 - 12:00 1.00 STMILL P WEXIT TIME MILLING AT 10868.85 FT. 2.50/2.53 BPM @ 2336 PSI. DWOB=1.34K. 12:00 - 13:30 1.50 STMILL P WEXIT TIME MILLING AT 10869.40 FT. 2.50/2.53 BPM @ 2428 PSI. DWOB=1.98K. INCREASE ROP TO 0.1 FT/6 MIN. 13:30 - 14:40 1.17 STMILL P WEXIT TIME MILLING AT 10870.50 FT. 2.50/2.50 BPM @2510 PSI. DWOB=3.66K. Printed 12/27/2011 12:38:36PM 7 .orth America -ALASKA- BP Page 3 of 21 Operation Summary Report Common Well Name:06-12 I AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: ;X3-010MV-C: (1,776,101.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time: j Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:40 - 16:10 1.50 STMILL P WEXIT TIME MILLING AT 10871.20 FT. 2.50/2.53 BPM @2472PSI. DWOB=3.60K. 16:10 - 19:30 3.33 STMILL P WEXIT TIME MILLING AT 10872.10 FT. 2.49/2.50 BPM @ 2483 PSI. DWOB=3.70K. 19:30 - 20:00 0.50 STMILL P WEXIT TIME MILLING AT 10873.6 FT. 2.49/2.50 BPM 2457 PSI. DWOB=3.16K. 20:00 - 21:00 1.00 STMILL P WEXIT TIME MILLING AT 10873.9 FT. 2.49/2.50 BPM @ 2457 PSI. DWOB.=3.37K. 21:00 - 22:00 1.00 STMILL P WEXIT TIME MILLING AT 10874.2 FT. 2.49/2.50 BPM @ 2457 PSI. DWOB=3.4K. 22:00 - 23:00 1.00 STMILL P WEXIT TIME MILLING AT 10875.1 FT. 2.49/2.50 BPM @ 2498 PSI. DWOB=3.52K. 23:00 - 00:00 1.00 STMILL P WEXIT TIME MILLING AT 10875.5FT. 2.49/2.50 BPM @ 2509 PSI. DWOB=3.33K. 11/10/2011 00:00 - 01:00 1.00 STMILL P WEXIT TIME MILLING AT 10876.2 FT. 2.49/2.50 BPM @ 2483 PSI. DWOB=2.68K. 01:00 - 03:00 2.00 STMILL P WEXIT TIME MILLING AT 10877.97 FT. 2.49/2.50 BPM @ 2344 PSI. DWOB=0.97K WINDOW IS OPEN FROM 10868'TO 10876'.TIME MILLING WINDOW REAMER TO DRESS WINDOW. SAMPLE TAKEN WITH LESS THAN 5%FORMATION IN SAMPLE.TIME MILL TO 10878.5'. MILL OUT OF WINDOW AT 10877.5' 03:00 - 05:30 2.50 STMILL P WEXIT DRILLING AHEAD TO 10886' 2.51 BPM AT 2501 PSI MUD WT IN OF 8.69 PPG OUT OF 8.63 PPG. WOB OF4.00K DRILLING OFF TO 3.0K ECD OF 9.85 PPG.PVT OF 412 BBLS. 05:30 - 08:40 3.17 STMILL P WEXIT BACK REAM WINDOW 2.52 BPM AT 2285 PSI P/U AT 1.0 FT/MIN. MAKE 3 SLOW PASSES UP AND DOWN, NOTHING SEEN. 08:40 - 11:00 2.33 STMILL P WEXIT DRY DRIFT IS SMOOTH, POOH. PERFORM JOG AT SURFACE._ 11:00 - 11:20 0.33 STMILL P WEXIT TAG STRIPPER AND FLOWCHECK WELL. TRIP SHEET IS-3 BBLS. 11:20 - 12:30 1.17 STMILL P WEXIT UD WINDOW MILLING BHA#1 MILL AND STRING REAMER ARE 3.78"NO-GO. 12:30 - 14:00 1.50 STMILL P WEXIT CHECK TREE BOLT TORQUE. SHIFT GOOSENECK FORWARD 1/8". M/U NEW BHA ON CATWALK. ABLE TO TIGHTEN 6 NUTS ON THE BOP/ SWAB FLANGE SLIGHTLY. 14:00 - 16:20 2.33 DRILL P INTI RIH BHA#2-HCC BI-CENTER,3.6 DEG XTREME,3"COILTRAK. 16:20 - 17:40 1.33 DRILL P INTI TIE-IN GR FROM 10600 FT. CORRECTED BY-27'. RIH AND TAG AT 10888'. Printed 12/27/2011 12:38:36PM forth America -ALASKA- BP Page 4 of 21 Operation Summary Report Common Well Name: 06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project: Prudhoe Bay Site:PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:40 - 20:30 2.83 DRILL P INTI DRILL AHEAD TO 10915' 2.50 BPM @ 2500 PSI MUD WT IN 8.72 PPG/ OUT 8.65 PPG. ROP OF 5 FT HR.WOB 5K DRILLING OFF TO 4K ECD OF 9.8 PPG. PVT OF 405 BBLS. 20:30 - 22:45 2.25 DRILL P INTI DRILLED TO GET TOOLS BY RA TAG. RELOG TO CONFIRM DEPTH CORRECTION FROM 10670' CORRECT TO-1.5'. HOLD UNANNOUNCED WELL CONTROL DRILL WITH MAN DOWN DRILL-MAN DOWN BEING THE WSL. DURING AAR IT WAS DECIDED THAT THE TOUR PUSHER WOULD NOTIFY THE DAY WSL OF THE EVENTS. IT WAS ALSO DISCUSSED ABOUT CHECKING EQUIPMENT THAT ONE MAY DEPEND ON.AFTER THE AAR THE HANDS INSPECTED THE TRAMA PACK IN THE DOG HOUSE AND DISCOVERED IT HAD OUT OF DATE ITEMS.THE TOUR PUSHER WAS NOTIFIED.GOOD DRILL AND GOOD RESPONSE TO THE DRILLS. 22:45 - 00:00 1.25 DRILL P INTI DRILL AHEAD TO 10932' 2.50 BPM @ 2292 PSI OFF BOTTOM 2571 PSI ON BOTTOM,MUD WT IN 8.72 PPG/OUT 8.65 PPG. ROP OF 11 FT HR.WOB 3K ECD OF 9.8 PPG. PVT OF 407 BBLS. 11/11/2011 00:00 - 05:00 5.00 DRILL P INTI DRILL AHEAD TO 11000' 2.50 BPM @ 2270 PSI OFF BOTTOM,2510 PSI ON BOTTOM, MUD WT IN 8.7 PPG/OUT 8.66 PPG. ROP OF 9 FT HR.WOB 3K ECD OF 9.8 PPG.PVT OF 406 BBLS. OBTAIN SPRS OF PUMP#1 =1.0 BPM=1245, 0.5 BPM=1033. PUMP#2=1.0 BPM=1240, 0.5 BPM=1044. 05:00 - 07:30 2.50 DRILL P INTI POH TO WINDOW. OPEN EDC FLUSH 7" MONITOR WELL.STATIC. POH FOR LATERAL BHA 07:30 - 10:00 2.50 DRILL P INTI UD BUILD SECTION BHA, BIT IS 1-3. M/U BHA#3-HCC BIT,3.125"MOTOR,3" COILTRAK WITH RES. 10:00 - 12:10 2.17 DRILL P INTI RIH WITH BHA#3. TIE-IN DEPTH AT RA TAG,CORRECT-28 FT. 12:10 - 12:30 0.33 DRILL P INTI RIH TO BOTTOM. GET SPP FOR PUMP#1,2 ON THE WAY DOWN. JUST OFF BOTTOM INCREASE RATE TO 3.5 BPM. 12:30 - 13:40 1.17 DRILL P INTI DRILL FROM 11000 FT. INITIAL ROP IS LOW, 10-20 FT/HR. HOLD OL TF FOR NOW TO BUILD ANGLE. AFTER 11010 FT ROP PICKS UP ABRUPTLY TO AROUND 100+FT/HR. DRILL FROM 11030 FT AT 100-120 FT/HR. 3.50/3.51 BPM @ 3300-3700 PSI. Printed 12/27/2011 12:38:36PM !Orth America -ALASKA- BP Page 5 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:40 - 16:30 2.83 DRILL P INTI DRILL FROM 11080 FT. CONTINUE HOLDING OL TF TO BUILD ANGLE. DRILL TO 11175 FT. 16:30 - 18:30 2.00 DRILL P INTI WIPER TRIP FROM 11175 FT TO WINDOW AND MAD PASS. 18:30 - 22:45 4.25 DRILL P INTI DRILL FROM 11175 FT. 3.54 BPM @ 3500PSI. WOB OF 4.11K, ROP OF 23 FT/HR.PIT VOLUME OF 407 BBL. 22:45 - 00:00 1.25 DRILL P INTI WIPER TO WINDOW. 11/12/2011 00:00 - 01:30 1.50 DRILL P INTI DRILL AHEAD FROM 11350' TO 11420' RATE OF 3.5 BPM AT 3435 PSI. ECD OF 9.62 PPG WT IN 8.78 PPG OUT 8.78 PPG. WOB OF 3.5K ROP OF 26. PVT OF 407 BBLS 01:30 - 03:00 1.50 DRILL P INTI GEO WIPER.TO 11,280' GEO DISCUSS WITH TOWN AND DIRECTIONAL DRILLER.THE SAG CAME IN HIGHER. DISCUSS WITH TOWN ODE THE NEW TD DEPTH THE FACT OF PLAN FOR 06-12BL IS STILL GOOD. NEW TD OF 11535' TO ACHIEVE GOAL. 03:00 - 04:15 1.25 DRILL. P INTI DRILL AHEAD RATE OF 3.55 BPM AT 3516 PSI. ECD OF 9.62 WT IN OF 8.81 PPG WT OUT OF 8.75 PPG REMOVE 40 BBLS FROM ACTIVE SYSTEM. PVT OF 364 BBLS. PRIOR TO LOSSES. WOB OF 3.68K ROP OF 125. LOSS RATE OF .1 BPM. PVT AT 0415 HRS.OF 351 BBLS. TD SECTION AT 11535.6'WHEN LOSS RATE INCREASED TO.40 BPM.BIT AT 90.75* 04:15 - 05:00 0.75 DRILL P INTI WIPER TRIP TO WINDOW. TIE IN TO CONFIRM TD PLUS 3'CORRECTION. LOSS RATE OF.50 BPM AT 0430 HRS. 05:00 - 05:45 0.75 DRILL P INTI RIH TO CONFIRM TD AT 11539.0' LOSS RATE WHILE RIH TO TD IS 0.12 BPM AT 0535 HRS. 05:45 - 09:30 3.75 DRILL P INTI POOH TO WINDOW. OPEN EDC. RUN CCL LOG FROM 10785'TO 10325' LOSS RATE OF 7.2 BPH.CALLED AND NOTIFIED ODE ON LOSS RATE.CONFIRMED TO RUN RETRIEVABLE LINER GUIDE SHOE. 09:30 - 12:30 3.00 DRILL P INTI TAG STRIPPER AND FLOW CHECK WELL. PJSM FOR LID DRILLING BHA. LID DRILLING BHA#3.PREP TO RUN LINER. REMOVE BHI CABLE HEAD AND PUMP 204 FT OF CABLE SLACK OUT,LEAVES 18 FT ACCORDING TO SLB RECORDS. 12:30 - 13:45 1.25 DRILL P INTI DROP 3/4"DRIFT BALL AND PUMP IT AROUND FILL WELL WITH 5.5 BBLS. 13:45 - 15:30 1.75 DRILL P INTI RECOVER 3/4"BALL. FILL WELL WITH 4.0 BBLS. 15:30 - 18:00 2.50 DRILL P INTI PJSM FOR M/U LINER BHA#4 BEGIN RIH WITH 3-3/16"LINER Printed 12/27/2011 12:38:36PM forth America-ALASKA-BP Page 6 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C:(1,776,101.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 20:00 2.00 DRILL X WAIT INTI CREW CHANGE. STOP OPERATIONS AND ATTEMPT TO DRIFT 3-3/16"TUBING WITH A BENT MOTOR ASSYEMBLY.ATTEMPTED A 2.5*BEND- HUNG UP AFTER 4.3'OF A 9'MOTOR AND BIT ASSY.ATTEMPTED A 2.1"BEND AND HUNG UP AT 5'IN.ATTEMPT A 1.6*AND COULD SHOVE IT ALL THE WAY IN. JOINT OF 3-3/16"WAS ON PIPE RACK ON IT SIDED.DISCUSSE RESULTS WITH TOWN ODE. FILL HOLE WITH 3 BBLS LOST. 20:00 - 22:30 2.50 DRILL P INTI CONTINUE TO RIH WITH 3-3/16"LINER AS PER TALLY. RIH WITH 29 JOINTS OF 3-3/16"TUBING. 22:30 - 23:30 1.00 DRILL P INTI M/U CIRCULATION HEAD CIRCULATE LINER VOLUME. PUMP RATE OF.42 BPM TAKING 5 BLLS TO FILL HOLE. PSI OF 626. 23:30 - 00:00 0.50 DRILL P INTI R/U TO RIH WITH CSHYDRILL. 11/13/2011 00:00 - 01:15 1.25 DRILL P INTI PJSM FOR RIH WITH CSH PIPE. M/U DOUBLE PIN RUN TO MAKE UP CSH. RIH WITH 2 STANDS OF CSH. 01:15 - 01:45 0.50 DRILL P INTI HOLD UNANNOUNCED WELL CONTROL DRILL WHILE RUNNING INNER STRING CSH PIPE IN 3-3/16"PIPE. CREW P/U SAFETY JOINT AND SCREWED IN TO HYDRIL PIPE THEN LOWERED XO TO 3-3/16"LINER. P/U AND LOWERED INTO WELL SO RAMS COULD CLOSE AROUND SAFETY JOINT.CLOSED THE RAMS IN WHICH TIME I ANNOUNCED THAT THE RAMS FAILED.THE MOTOR MAN NEUTRALIZED THE WORKING RAMS AND CLOSED ANOTHER SET.THE DRILL WAS SUCCESSFUL.TIME FOR WELL TO BE SECURED WAS 8 MIN. AAR THE HANDS MENTIONED THIS ISA NEW SETUP AND COULD GET BETTER WITH PRACTICE.COMMUNICATIONS WAS COMPLICATED WITH THE NOISE IN THE KUMMY ROOM AND OVER RADIOS.THE TOUR PUSHER IS LOOKING INTO INSTALLING A GIATRONICS NEXT TO KUMMY TO HELP WITH COMMUNICATIONS. 01:45 - 05:00 3.25 DRILL P INTI UD SAFETY JOINT. CONTINUE TO RIH WITH CSH PIPE INNER STRING SPACE OUT. INNER STRING CONSISTS OF FROM BOTTOM TO TOP-4'PUP,14 STANDS,11'PUP,4'PUP, 4'PUP,1'PUP,1'PUP. M/U LINER RUNNING TOOLS AND 4 JOINTS PH-6.M/U TO COIL. M/U QTS. 05:00 - 07:00 2.00 DRILL P INTI TEST QTS RIH WITH LINER ON COIL. Printed 12/27/2011 12:38:36PM lorth America -ALASKA- BP Page 7 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:00 - 07:45 0.75 DRILL P INTI CONTINUE RIH WITH LINER. WT CHECK JUST ABOVE WINDOW IS 47K AT 10 FT/MIN. STOP AT 1ST FLAG AND CORRECT-25 FT, CONSISTENT WITH EARLIER CORRECTIONS. PASS THROUGH WINDOW AND RIH TO BOTTOM. • (. "' TAG BOTTOM AT 11537 FT. V 07:45 - 08:00 0.25 DRILL P INTI WT CHECK AT 10 FT/MIN IS 45K. REPEAT WITH SAME RESULTS. MOVE REEL TO A BALL DROP POSITION. DROP 5/8"STEEL BALL AND LAUNCH WITH 1100 PSI. CHASE AT 2.27 BPM WITH POWER-VIS,BALL IS HEARD ROLLING. 08:00 - 08:50 0.83 DRILL P INTI TRY TO MOVE BACK DOWN TO BOTTOM, CAN'T GO DOWN. CONTINUE PUMPING BALL OVER GOOSENECK. WORK PIPE BACK TO BOTTOM. PUMP BALL TO SEAT AT LOW RATE. BALL ON SEAT AT 31.2 BBLS. SHEAR OUT BALL SEAT AT 3500 PSI. 08:50 - 09:00 0.17 DRILL P INTI PICK UP 10 FT/MIN AT MIN PUMP RATE. UP WT IS 40K, LOSS OF 4K FROM BEFORE. GO BACK DOWN AND PICK UP AGAIN TO SHEAR OUT GUIDE SHOE. PICK UP 10 FT/MIN, NOTHING SEEN ON WT INDICATOR TO INDICATE SHEARING OUT GUIDE SHOE. 09:00 - 12:40 3.67 DRILL P INTI POOH 20 FT/MIN. PUMP 1.07 BPM THROUGH CT WHILE POOH. AT LINER TOP 30 MIN FLOW CHECK IS GOOD. 12:40 - 16:00 3.33 DRILL P INTI TAG STRIPPER AND FLOW CHECK WELL. TRIP SHEET IS EVEN. LID 4 JTS PH6. RECOVER 5/8"STEEL BALL. STAND BACK 14 STDS OF 1.25"CSH. 16:00 - 19:30 3.50 DRILL P INTI INSPECT GUIDE SHOE PULLING TOOL,GUIDE SHOE HAS NOT BEEN RECOVERED. PREP RIG FLOOR FOR NOZZLE RUN. CLEAN PITS FOR KCL. 19:30 - 21:15 1.75 DRILL P INTI PJSM FOR M/U BHA. M/U NOZZLE BHA#5 M/U INJECTOR HEAD, TEST QTS. 21:15 - 23:30 2.25 DRILL P INTI RIH WITH 3.5"NOZZLE TO TOP OF LINER. RATE OF.45 BPM WITH 1000 PSI PARAMETERS OF 42K UP AND 21K DOWN AT 10500'. TAG TOL AT 10630.8'MD. 23:30 - 00:00 0.50 DRILL P INTI DISPLACE WELL FROM 8.7 PPG MUD TO 8.4 PPG KCL. 3.46 BPM @ 2124 PSI. 11/14/2011 00:00 - 00:30 0.50 DRILL C INTI DISPLACE WELL FROM 8.7 PPG MUD TO 8.4 PPG KCL. 3.46 BPM @ 2124 PSI ICP AND 1690 FCP. Printed 12/27/2011 12:38:36PM lorth America -ALASKA- BP Page 8 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:30 - 01:15 0.75 DRILL C INTI OBTAIN SPRS:#1-3.5 BPM AT 1675 PSI,1 BPM AT 231 PSI,0.5 BPM AT 85 PSI. #2 3.5 BPM AT 1685 PSI, 1 BPM AT 212 PSI, 0.5 BPM AT 73 PSI. FILL PITS AND GET STRAPS FOR TRIP SHEET. 10 MIN FLOW CHECK.STATIC. 01:15 - 04:30 3.25 DRILL C INTI POH TO BHA. MONITOR WELL STATIC L/D BHA. 04:30 - 07:00 2.50 DRILL C INTI PJSM FOR R/U SLICK LINE EQUIPMENT. BRING TOOLS AND EQUIPMENT TO FLOOR AND R/U. FULL PRESSURE CONTROL. 07:00 - 10:15 3.25 DRILL C INTI RIG UP SLICKLINE,BRING STUFFING BOX AND TOOLS TO RIG FLOOR. FILL WELL WITH 2.5 BBLS AT 07:15 FUNCTION TEST BOPS FROM DRILLER'S PANEL. 10:15 - 11:00 0.75 DRILL C INTI PUT SLICKLINE BOPS ON WELL. FILL WELL WITH 2.5 BBLS. 11:00 - 12:45 1.75 DRILL C INTI M/U X-LOCK BHA THEN RISER. HOOK UP DIESEL PUMP TO VALVES 17, 18 ON BOP STACK. FILL LUBRICATOR WITH DIESEL FOR PT. PT 350/3500 PSI,GOOD. RECORDED ON SLB WHP GAUGE. 12:45 - 14:00 1.25 DRILL C INTI LEAVE WELL SHUT IN FOR SLICKLINE WORK. RIH WITH X-LOCK. FIND LINER TOP AT 10636 FT, UNCORRECTED. PICK UP AND FIND X NIPPLE AT 10624 FT. WORK LOCK INTO PROFILE AND SET. 14:00 - 15:00 1.00 DRILL C INTI POOH. 15:00 - 15:30 0.50 DRILL C INTI BRING TOOL TO SURFACE. LIFT OFF LUBRICATOR AND INSPECT SETTING TOOL, HAS SET PROPERLY. INDICATOR PIN SHEARED TO CONFIRM FISH NECK PROFILE OF PLUG HAS LOCKED IN PLACE. 15:30 - 16:30 1.00 DRILL C INTI OFFLOAD SLICKLINE EQUIPMENT FROM RIG. FILL WELL WITH 2.5 BBLS. 16:30 - 18:30 2.00 DRILL N INTI PREP RIG FLOOR TO RUN FISHING TOOLS. CREW CHANGE. 18:30 - 21:30 3.00 DRILL N INTI M/U FISHING BHA. STAB INJECTOR TEST QTS. 21:30 - 00:00 2.50 DRILL N INTI RIH WITH FISHING BHA#6 RATE OF.39 BPM AND 425 PSI. 11/15/2011 00:00 - 00:45 0.75 DRILL N DFAL 11,539.00 INTI RIH WITH FISHING BHA#6 OBTAIN PARAMETERS ABOVE X-LOCK AND ABOVE FISH. RIH TO 11566'UNCORRECTED WITH NO PUMP AND STACK 2K ON FISH. P/U WITH A 3K SHEAR. GOOD INDICATION OF HAVING FISH ON. PULL UP HOLE 50'AND RIH SEEING A INCREASE OF 1-2K DRAG RIH. APPLY 200 PSI ON BACK SIDE AND POOH TO TOP OF X-LOCK. Printed 12/27/2011 12:38:36PM forth America-ALASKA- BP Page9 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:45 - 04:00 3.25 DRILL N DFAL 11,539.00 INTI POOH WITH 200 PSI ON BACK SIDE. POOH AT 23 FPM PUMP AT 1.05 BPM WITH 70 PSI AND 223 PSI ON WELL HEAD. MONITOR WELL FOR 10 MIN.STATIC. 04:00 - 05:30 1.50 DRILL N DFAL 11,539.00 INTI LID BHA STAND BACK CSH. RETRIEVED FISH. 05:30 - 07:15 1.75 DRILL P INTI CLEAR AND CLEAN RIG FLOOR. PUMP ACROSS TOP OF WELL. 07:15 - 08:00 0.75 DRILL P INTI SHUT IN WELL. PREP TO PUMP CABLE SLACK BACKWARDS. PUMP CABLE SLACK BACKWARDS AT 3.5 BPM. CABLE IS HEARD MOVING. LIFT INJECTOR OFF WELL,RIG UP HYDRAULIC CUTTER. 08:00 - 09:30 1.50 DRILL P INTI CUT 225 FT OF CT OFF. CABLE ISN'T FOUND. DRESS END OF CT FOR INTERNAL DIMPLE CONNECTOR. INSTALL FLUSH 2-3/8"CONNECTOR. 09:30 - 10:30 1.00 DRILL P INTI PULL TEST CONNECTOR TO 35K,GOOD PUT INJECTOR OVER CIRC HOLE AND PUMP CABLE FORWARD TO FIND IT. PUMPED TOO MUCH CABLE OUT. 10:30 - 12:00 1.50 DRILL N HMAN INTI CUT OFF CT CONNECTOR AND PUMP SLACK BACKWARDS AGAIN. CUT OFF ANOTHER 75 FT OF CT. FILL WELL WITH 3.5 BBLS. M/U CONNECTOR AGAIN AND PULL TEST TO 35K,GOOD. 12:00 - 13:10 1.17 DRILL P INTI GET ON WELL AND PURGE END OF CT WITH AIR TO PREVENT FREEZEUP. LIFT INJECTOR OFF WELL AND REMOVE NOZZLE. INSTALL BHI CABLE HEAD. 13:10 - 14:40 1.50 DRILL P INTI PRESSURE TEST CT CONNECTOR AND BHI CABLE HEAD TO 300/3500 PSI,GOOD. M/U CT RISER TO WELL AND PT CHECK VALVES AND LUBRICATOR TO 300/3500 PSI, GOOD. FILL WELL WITH 0.5 BBLS. 14:40 - 16:00 1.33 DRILL P PROD1 PJSM FOR M/U BHA. M/U BHA#7-HCC BIT,2-3/8"COILTRAK WITH RES. BHA OAL= PT QUICK TEST SUB TO 500/3500 PSI, GOOD. 16:00 - 18:40 2.67 DRILL P PROD1 PUMP 1 REEL VOLUME FORWARD AT 3 BPM TO COMPLETE SLACK MANAGEMENT. RIH TO 10437' 18:40 - 21:30 2.83 DRILL P PROD1 DISPLACE WELL AND MUD SYSTEM TO NEW 8.61 PPG POWER VIS MUD. PVT=399 BBLS. Printed 12/27/2011 12:38:36PM ,orth America -ALASKA- BP I Page 10 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 23:45 2.25 DRILL P PROD1 WITH EDC OPEN- RIH 30 FPM. PUMPING 1.8 BPM 1565 PSI. 10590'P/U WT 42K. AT TOL 10603'ECD=9.59 PPG.AP=4275 PSI PUMPING 1.84 BPM 1432 PSI. I/A 356 PSI.0/A 48 PSI. CONTINUE RIH 20 FPM TO 10851' LOG TIE IN AT 10850'-27.5'CORRECTION. RIH 25 FPM TO 11060' P/U WT 42.5K.RIH TO 11520' PUMPING 1.82 BPM 1500 PSI. ECD=9.65 PPG.ANNULAR PSI=4423 PSI. TAG BOTTOM AT 11536.7' 23:45 - 00:00 0.25 DRILL P PROD1 DRILL AHEAD. F/S 1.6 BPM 1770 PSI.WITH 270 PSI MOTOR WORK. I/0=8.63/8.63 PPG.WHP=57 PSI.DHWOB= p 1.5K. �-174 PVT=405 BBLS.ECD=9.6 PPG.NP=4960 PSI. I/A=376 PSI.O/A=57 PSI. DRILL TO 11546[' 11/16/2011 00:00 - 00:50 0.83 DRILL P PROD1 DRILL AHEAD FROM 11546' F/S 1.6 BPM 1770 PSI.WITH 270 PSI MOTOR WORK. I/0=8.63/8.63 PPG.WHP=66 PSI.DHWOB= 1.5K.ROP=55 FPH PVT=401 BBLS. ECD=9.67 PPG.A/P=4998 PSI. I/A=391 PSI.O/A=61 PSI. DRILLING TO 11590' 00:50 - 01:00 0.17 DRILL P PROD1 WIPER TO 11547' 01:00 - 02:00 1.00 DRILL P PROD1 DRILL AHEAD FROM 11590' F/S 1.6 BPM 1770 PSI.WITH 270 PSI MOTOR WORK. I/0=8.62/8.61 PPG.WHP=66 PSI.DHWOB= 1.5K. ROP=55 FPH. PVT=401 BBLS. ECD=9.64 PPG.A/P=4970 PSI. I/A=391 PSI.0/A=61 PSI. PUMP 10 BBL HI VIS SWEEP. DRILL TO 11650' 02:00 - 02:20 0.33 DRILL P PROD1 WIPER TO 11547' 02:20 - 02:50 0.50 DRILL P PROD1 DRILL AHEAD FROM 11650'TO 11675' 02:50 - 03:00 0.17 DRILL P PROD1 CHASE SWEEP UP HOLE. SPR 1 AND 2 MP. 03:00 - 03:55 0.92 DRILL P PROD1 DRILL AHEAD FROM 11675' F/S 1.64 BPM 1860 PSI.WITH 270 PSI MOTOR WORK. I/0=8.63/8.62 PPG.WHP=66 PSI. DHWOB= 1.5K. ROP=52 FPH. PVT=397 BBLS.ECD=9.68 PPG.A/P=4790 PSI. I/A=474 PSI.O/A=77 PSI DRILL TO 11725' 03:55 - 04:10 0.25 DRILL P PROD1 WIPER TO 11547'-CLEAN. Printed 12/27/2011 12:38:36PM Jorth America -ALASKA- BP Page 11 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C:(1,776,101.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:10 - 07:20 3.17 DRILL P PROD1 DRILL AHEAD FROM 11725' F/S 1.58 BPM 1865 PSI. 350 PSI MOTOR WORK. I/0=8.64/8.62 PPG.WHP=62 PSI. DHWOB= 1.75K. ROP=33 FPH. PVT=391 BBLS. ECD=9.72 PSI.NP=5126 PSI. DRILL TO 11860 FT. 07:20 - 09:00 1.67 DRILL P PROD1 CONTINUE DRILLING FROM 11860 FT, HOLD 60L TF FOR NOW TO TRY AND GAIN ANGLE. ROP IS 40-50 FT/HR WITH AROUND 2K DWOB. PVT=379 BBLS. 09:00 - 11:30 2.50 DRILL P PROD1 CONTINUE DRILLING FROM 11880 FT WITH SLOW ROPS. DRILL AT 30L TF TO TRY AND BUILD ANGLE OUT OF SHUBLIK. PUMP A 10 BBL SWEEP AT 11860 FT. DRILL TO 11900 FT. 11:30 - 13:15 1.75 DRILL P PROD1 WIPER TRIP FROM 11900 FT TO TOP OF LINER. PERFORM 50 FT JOG BELOW BOTTOM OF LINER AND OPEN EDC AT 11550 FT. PULL BACK THROUGH LINER AT 15 FT/MIN PUMPING 3.58 BPM. ECD AROUND 10.30 PPG AT THIS RATE. 13:15 - 14:40 1.42 DRILL P PROD1 TIE-IN DEPTH TO RA TAG AT 10880 FT. CORRECT+2 FT. RIH TO BOTTOM. CLEAN PASS UP AND DOWN. 14:40 - 17:00 2.33 DRILL P PROD1 DRILL FROM 11900 FT. HOLD 90L TF FOR NOW TO CONTINUE LH TURN AND MAINTAIN 92 DEG ANGLE. PVT=314 BBLS,LOST ABOUT 20 BBLS ON TRIP. MUD LOSSES ABOUT 10-12 BBUHR. ECD=10.02 PPG. DRILL TO 12050 FT. PUMP 10 BBL HI VIS SWEEP. 17:00 - 18:00 1.00 DRILL P PROD1 WIPER TRIP FROM 12050 FT.TO 11555 FT. CLEAN 18:00 - 20:00 2.00 DRILL P PROD1 DRILL AHEAD FROM 12050 FT.MAINTAIN 90 DEG INCLINATION FOR NOW. HOLE CONTINUES TAKING 6-7 BBLS HR. F/S= 1.65 BPM 2200 PSI. 150 PSI MOTOR WORK. ROP=70/90 FPH DHWOB=2K.ECD=10.08 PPG.AP=5354 PSI. WHP=60 PSI.PVT=392 BBLS. I/A=593 PSI. O/A=209 PSI PUMP 10 BBL HI VIS SWEEP. DRILLING TO 12200 FT. 20:00 - 21:00 1.00 DRILL P PROD1 WIPER FROM 12200 FT TO 11560 FT.CLEAN. 21:00 - 23:30 2.50 DRILL P PROD1 DRILL AHEAD FROM 12200 FT.CONTINUE 90 DEG INCLINATION TO 8710 FT TVD. F/S=1.67 BPM 2219 PSI.200/225 PSI MOTOR WORK. DHWOB=2K.ROP 75 FPH. ECD=10.24 PPG. AP=5404 PSI. I/0=8.68/8.68 PPG. HOLE CONTINUES TAKING 6-7 BPH. PVT=395 BBLS. I/A=602 PSI.O/A= 197 PSI. WHP=62 PSI. DRILLING TO 12313 FT. 23:30 - 00:00 0.50 DRILL P PROD1 WIPER AS PER GEO FROM 12313 FT. Printed 12/27/2011 12:38:36PM lorth America -ALASKA- BP Page 12 of 21 Operation Summary Report Common Well Name:06-12 1AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/17/2011 00:00 - 03:00 3.00 DRILL P PROD1 WIPER TRIP FROM 12313 FT AS PER GEO TO 11550 FT PERFORM 50 FT JOG.OPEN EDC AT 11550 FT. PUMP 3 BPM 2650 PSI. POH 23 FPM TO 10845 FT. LOG TIE IN. +3 FT CORRECTION.RIH PUMPING 3 BPM TO 11550' CLOSE EDC.RIH.CLEAN 03:00 - 05:30 2.50 DRILL P PROD1 DRILLING FROM 12313 FT.SAMPLE CONFIRMED DRILLING IN SHUBLIK F/S=1.68 BPM 2180 PSI.350 PSI MOTOR WORK. DHWOB=2-3K.ROP 30-40 FPH. ECD=10.26 PPG.AP=5361 PSI. I/0=8.67/8.65 PPG.HOLE TAKING 5 BPH. PVT=395 BBLS. I/A=650 PSI.O/A=255 PSI. WHP=62 PSI. RECORD SPR FOR 1 AND 2 MP. CONTINUE DRILLING TO 12372 FT. GAMMA TOOL FAILURE. 05:30 - 09:30 4.00 DRILL N DFAL 12,372.00 PROD1 PUMP 10 BBL HI VIS SWEEP. POH FOR MWD GAMMA TOOL FAILURE. POH TO 11550 FT, PERFORM 50 FT JOG. OPEN EDC. POH 25 FPM PUMPING 3 BPM 2670 PSI. SHUT OFF PUMP PASSING THROUGH X-LOC 2 10592 FT 09:30 - 09:50 0.33 DRILL N PROD1 BHA AT SURFACE, L/D BHA#7. 09:50 - 10:15 0.42 DRILL N PROD1 UNANNOUNCED KICK DRILL WHILE CHANGING BHA. CUP OF FLUID IS HELD UNDER PIT SENSOR EYE TO SIMULATE A PIT GAIN. DRILLER HAD HIS PIT LEVEL ALARM SET CORRECTLY AND NOTICES THE GAIN. BHA IS PULLED UP ABOVE THE BLIND SHEARS AS PER STANDING ORDERS. TIME FROM PIT GAIN TO READY TO CLOSE THE WELL IN IS 1.5 MIN. FLOOR IS CLEARED, RIG CREW GOES TO THEIR ASSIGNED POSITIONS FOR A WELL CONTROL EVENT. CONDUCT AAR. 10:15 - 11:30 1.25 DRILL N PROD1 PICK UP BHA#8-2.7 x 3.0 HCC BICENTER,1.0 DEG XTREME,2.37 COILTRAK WITH RES. BHA OAL=67.85 FT. 11:30 - 15:20 3.83 DRILL N PROD1 RIH BHA#8. TIE-IN GR,CORRECT-26 FT. CONTINUE RIH THROUGH 3-3/16"LINER WITH OPEN EDC. 15:20 - 17:00 1.67 DRILL P PROD1 GET SLOW PUMP PRESSURES NEAR BOTTOM THEN DRILL FROM 12372 FT. HOLD 94 DEG FOR NOW TO GAIN SEPARATION FROM SHUBLIK BELOW. INITIAL ROP IS 20 FT/HR LATER INCREASING TO 70-80 FT/HR. DRILL TO 12460 FT. 17:00 - 18:30 1.50 DRILL P PROD1 WIPER TRIP FROM 12460 FT AS PER GEO. CLEAN. Printed 12/27/2011 12:38:36PM Jorth America -ALASKA- BP Page 13 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00©68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:30 - 19:15 0.75 DRILL P PROD1 DRILL AHEAD FROM 12460'TO 12500' F/S=1.68 BPM 2200 PSI.WITH 820 PSI MOTOR WORK. DHWOB=2-2.5K. ROP= 100 FPH. I/0=8.65/8.66 PPG. ECD= 10.35 PPG. WHP=60 PSI. I/A=638 PSI.O/A=212 PSI. PVT=346 BBLS. HOLE TAKING ABOUT 6-7 BPH. 19:15 - 20:30 1.25 DRILL P PROD1 WIPER TRIP FROM 12500'TO 11560 FT. CLEAN. 20:30 - 23:10 2.67 DRILL P PROD1 DRILL AHEAD FROM 12500 FT. DROP TO 8705 FT TVD AND LEVEL OFF AT 90 DEG. F/S=1.68 BPM 2250 PSI.250/300 PSI MOTOR WORK. DHWOB=2.1K. ROP 75 FPH.ECD=10.47 PPG. AP=5424 PSI. I/0=8.69/8.65 PPG. HOLE CONTINUES TAKING 6-7 BPH. PVT=341 BBLS. I/A=650 PSI.O/A=210 PSI. WHP=62 PSI. DRILLING TO 12652 FT. PUMP 10 BBL HI VIS SWEEP. 23:10 - 00:00 0.83 DRILL P PROD1 WIPER TRIP FROM 12652 FT. 11/18/2011 00:00 - 00:45 0.75 DRILL P PROD1 WIPER TRIP TO 11560 FT.CLEAN 00:45 - 03:00 2.25 DRILL P PROD1 DRILL AHEAD FROM 12652 FT. F/S= 1.71 BPM 2380 PSI.230 PSI MOTOR WORK. DHWOB=2K.ROP 80 FPH. ECD=10.55 PPG. AP=5444 PSI. I/0=8.7/8.65 PPG.HOLE CONTINUES TAKING 6-7 BPH. / PVT=404 BBLS. I/A=700 PSI.O/A=244 PSI. +/ WHP=62 PSI. DRILL TO 12776 FT.ENCOUNTERED TOTAL LOSSES 03:00 - 04:30 1.50 DRILL P PROD1 NOTIFY FIELD SUPERINTENDANT,ODE AND WTL. DECISION MADE TO CONTINUE DRILLING. CLOSE IN CHOKE. MONITOR FOR WHP. PUMPING 1.7 BPM 1800 PSI.WHP=0 PSI. CONTINUE DRILLING FROM 12776 FT. CURRENTLY 287 BBLS MUD IN PITS WITH 290 BBLS ON LOCATION IN VAC TRUCK. 2ND VAC TRUCK IN ROUTE WITH MORE MUD. NOTIFY MUD MAN TO BUILD MORE 8.6 PPG MUD. DRILL TO 12826 FT. 04:30 - 06:00 1.50 DRILL P PROD1 WIPER TRIP FROM 12826 FT FOR TIE IN. CHOKE REMAINS CLOSED.MONITOR FOR WHP. PUMPING 1.7 BPM HOLE CONTINUES ON TOTAL LOSSES. OPEN EDC AT 11550 FT BEFORE ENTERING LINER. 06:00 - 07:30 1.50 DRILL P PROD1 TIE-IN DEPTH. CORRECT+5 FT. RIH BACK TO BOTTOM WITH CLOSED CHOKE,OPEN EDC IN CASING. ECD=8.90 PPG,WHP=0. Printed 12/27/2011 12:38:36PM Jorth America -ALASKA- BP Page 14`of`21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) _ Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 08:20 0.83 DRILL P PROD1 TAG AT 12810 FT,ABOUT 16 FT OFF BOTTOM. PICK UP AND WORK PAST. START DRILLING FROM 12830 FT. WHP CLIMBS TO 200 PSI,OPEN UP AND GET 0.3 BPM RETURNS. CONTINUE DRILLING, RETURNS AROUND 0.3 BPM. DRILL 20 FT AND PULL BACK TO 12700 FT, CLEAN PICKUP. RETURNS FLUCTUATING BETWEEN 0.2-0.45 BPM DURING SHORT TRIP. NEAR BOTTOM RETURNS<0.1,SHUT IN WELL AND WHP STAYS<0. 08:20 - 09:10 0.83 DRILL P PROD1 DRILL TO 12900 FT AND PICK UP BACK TO 12700 FT. ECD=9.21. SOME 5K OVERPULLS SEEN OFF BOTTOM. ABOVE THE LOSS ZONE WHP INCREASES TO 20 PSI,LEAVE WELL SHUT IN. DRILL TO 12975 FT. WHP HAS INCREASED TO 100 PSI IN THE PAST 20 FT. 09:10 - 10:30 1.33 DRILL P PROD1 WIPER FROM 12975 FT TO SHOE. WHP UP TO 170 PSI AND CLIMBING RAPIDLY JUST OFF BOTTOM,OPEN WELL UP. RETURNS SETTLE OUT<0.2 BPM. ABOVE LOSS ZONE RETURNS FALL TO 0.1 BPM. SHUT IN WELL,WHP<0. CONTINUE WIPER BACK TO 11560 FT. ECD= 9.24 PPG. DURING WIPER TRIP WI-IP SLOWLY INCREASES TO 190 PSI. OPEN WELL AND GET 0.6 BPM RETURNS INITIALLY THEN FALLS TO 0.1. ECD=9.1 PPG. SHUT IN WELL. MOTOR WORK SEEN AT 12120 FT BUT NO OVERPULL. NO EXCESS ANNULAR PRESSURE. RUN BACK DOWN FREELY, NO STACKING. START 10 BBLS VISCOUS SWEEP AROUND. PICK BACK UP SLOWLY. OVERPRESSURE AT 12170 FT,SLOW DOWN PULLING SPEED. SEE 5K OVERPULLS. RIH FREELY. NO RETURNS. SHUT IN WELL. CONTINUE WORK PIPE AT VARYING SPEEDS, 5-10K OVERPULLS AND BREAK FREE. PULL UP TO SHOE. 10:30 - 11:20 0.83 DRILL P PROD1 OPEN EDC AND PULL INTO 3-3/16 LINER. PUMP 2.0/0.4 BPM,CONTINUE WIPER TO ABOVE LINER. 11:20 - 17:00 5.67 DRILL P PROD1 PULL ABOVE X-LOCK AND CLEAN TUBING. WAIT ON ORDERS FROM TOWN. 17:00 - 18:15 1.25 DRILL P PROD1 TIE IN AT 12840 FT.+3.5 FT CORRECTION. 18:15 - 19:45 1.50 DRILL P PROD1 P/U DURING CCL.OPEN EDC AT 11550 FT. PULL INTO CASING ABOVE X-LOC AT 10592 FT. WITH CHOKE OPEN. PUMPING 1.15 BPM 950 PSI.WITH RETURNS OF.28 BPM. Printed 12/27/2011 12:38:36PM ,lorth America -ALASKA- BP Page 15 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00©68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:45 - 00:00 4.25 DRILL P PROD1 WAIT ON PLAN FORWARD FROM TOWN BEFORE CONTINUING. CIRCULATE.77 BPM 700 PSI WITH CHOKE OPEN. .16 BPM RETURNS. CLEAN RIG.CHANGE OIL#3 RIG GENERATOR. 11/19/2011 00:00 - 09:00 9.00 DRILL P PROD1 WAIT ON PLAN FORWARD FROM TOWN BEFORE CONTINUING. WITH EDC OPEN AT 10952 FT. CIRCULATE.77 BPM 680 PSI WITH CHOKE OPEN. .16 BPM RETURNS. FINISH OIL CHANGE#3 RIG GENERATOR. PJSM,CHANGE LINERS AND SWABS ON MP# 2.CHANGE BLEEDER VALVE. CONTINUE CLEANING RIG.TEST#2 MP. 09:00 - 09:40 0.67 DRILL P PROD1 RIH FOR CLEANOUT. AT 11550 STOP AND CLOSE EDC. SHUT IN WELL AT HAND CHOKE. PERFORM CLEANOUT TO TD AGAINST CLOSED CHOKE. 09:40 - 10:45 1.08 DRILL P - PROD1 RIH 15-20 FT/MIN PUMPING 1.7 BPM. WHP INCREASES TO AROUND 200 PSI. CONTINUE RIH PAST 11700 FT PUMP 1.7 BPM, ECD=9.39 PPG,WHP=240 PSI. GIVE AOGCC 24 HR NOTICE OF BOP TEST AT 10:00. RECIEVE CALL FROM JEFF JONES,WAIVED WITNESS. RIH PAST 12000 FT,1.7 BPM, ECD=10.06 PPG,WHP=550 PSI. 12,300 FT,1.7 BPM, ECD=9.95 PPG,WHP= 498 PSI. 12,600 FT,1.7 BPM, ECD=10.02 FT,WHP= 470 PSI. 10:45 - 11:40 0.92 DRILL P PROD1 CLEAN PASS DOWN. AT 12,700 FT TURN AROUND, PULL BACK TO PAINT A FLAG AT 12550 FT EOP. REDUCE PUMP TO 1 BPM TEMPORARILY WHILE PARKED. CONTINUE POOH 20 FT/MIN PUMP 1.7 BPM, ECD= 10.26 PPG,WHP=795 PSI. 11:40 - 12:40 1.00 DRILL P PROD1 STOP AT 11550 FT AND OPEN WELL UP SLOWLY. OPEN EDC. POOH,PUMP 1.52/1.03 BPM THROUGH OPEN EDC INSIDE LINER. TOTAL FLUID INJECTED INTO FORMATION DURING CLEANOUT RUN IS 200 BBLS. 12:40 - 13:10 0.50 DRILL P PROD1 PULL TO 10573 FT AND FLOW CHECK WELL. WELL IS FLOWING SLIGHTLY,STEADY FLOW. SHUT IN WELL. PIT GAIN<1 BBL. RECORD PRESSURES AND TIMES. NOTIFY CTD SUPT OF WELL SHUT IN. GAIN 30 PSI IN 25 MIN ON WHP. 13:10 - 13:20 0.17 DRILL P PROD1 PUMP 4 BBLS TO WARM UP CT,LEAVE WELL SHUT IN. WHP GOES FROM 10 PSI TO 260 PSI THEN BLEEDS OFF. 13:20 - 13:40 0.33 DRILL P PROD1 PERFORM EXHALE TEST. RETURN 0.3 BBLS OF FLUID IN 20 MIN. Printed 12/27/2011 12:38:36PM forth America-ALASKA- BP Page 16 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:40 - 14:05 0.42 DRILL P PROD1 PUMP 2 BBLS TO WARM UP CT THEN SHUT IN WELL AND MONITOR PRESSURE. BUILDS 4 PSI IN 20 MIN. 14:05 - 14:40 0.58 DRILL P PROD1 OPEN WELL AND WARM UP CT. NOTIFY CTD/RWO WTL AND DISCUSS PLAN FORWARD. 14:40 - 17:15 2.58 DRILL P PROD1 CIRC TO WARM UP CT THEN SHUT DOWN FOR FLOW CHECK. FLOW CHECK IS NEGATIVE. POOH.TAG UP. 17:15 - 18:00 0.75 DRILL P PROD1 FLOW CHECK WELL.WELL CONTIUES ON VAC. 18:00 - 18:50 0.83 DRILL P PROD1 PJSM. PUMPING DOWN BACKSIDE. L/D BHA#8, BIT GRADE=2/1/BT/N/X/I/NO/HP. M/U NOZZLE 18:50 - 20:30 1.67 DRILL P PROD1 PJSM.CLOSE SWAB VALVE. STAB INJECTOR.FILL AND SHUT IN CHOKE. PRESSURE TEST PACKOFF AGAINST SWAB VALVE TO 250/3500 PSI 5 MIN EACH. 20:30 - 00:00 3.50 DRILL N PROD1 OPEN SWAB FILL HOLE. PJSM.UNSTAB INJECTOR. M/U LUBRICATOR CAP.CLOSE SWAB.PT CAP TO 250/3500 PSI. OPEN SWAB, PUMP THROUGH KILL LINE KEEPING HOLE FULL. R/U AND PUMP SLACK FORWARD 3 BPM. RECOVERED 212 FT SLACK. INSTALL E-LINE BOOT.M/U CATCHER. PUMP 5/8"STEEL BALL AND DRIFT COIL. 11/20/2011 00:00 - 00:45 0.75 DRILL N PROD1 DRIFT COIL WITH 5/8"STEEL BALL. RECOVER BALL. 00:45 - 02:00 1.25 DRILL N PROD1 PJSM.M/U SAFETY JT. M/U BHA#9,INFLATABLE CEMENT RETAINER,SPOTTING VALVE, XO, HYD DC,X0,4 JTS 2 1/16"CSH,XO, CTC. DRIFT CSH. M/U INJECTOR.PVT=370 BBLS 02:00 - 02:30 0.50 DRILL N PROD1 TEST QTS TO 250/3500 PSI 5 MIN EACH. 02:30 - 06:30 4.00 DRILL N PROD1 SET PUMP TRIP TO 500 PSI. RIH WITH CEMENT RETAINER BHA#9 AS PER OPS NOTE. RIH 60 FPM,#2 MP PUMPING DOWN COIL.3 BPM 300 PSI. #1 MP PUMPING DOWN KILL LINE.5 BPM TO ENSURE HOLE STAYS FULL. SLOWING DOWN 10 FPM RUNNING THROUGH JEWELRY. 06:30 - 08:30 2.00 DRILL N PROD1 RIH WITH INFLATABLE RETAINER. NOTHING SEEN GOING THROUGH LINER. RIH CAREFULLY THROUGH OPEN HOLE,20 FT/MIN. Printed 12/27/2011 12:38:36PM North America -ALASKA- BP Page 17 of 21 Operation Summary Report Common Well Name: 06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:30 - 11:30 3.00 DRILL N PROD1 RIH TO FLAG AND CORRECT-34.2 FT. PICK UP TO SETTING DEPTH AT 12675', WHICH IS ALSO A GOOD BALL DROP POSITION. LAUNCH 1/2"STEEL BALL WITH 1200 PSI. CHASE WITH MUD AT 1.8 BPM. BALL IS NOT HEARD ROLLING. AT 20 BBLS AWAY SLOW PUMP TO 0.4 BPM DOWN THE CT. CONTINUE PUMPING ACROSS TOP TO KEEP THE HOLE FULL. 11:30 - 12:10 0.67 DRILL N PROD1 AFTER 80 BBLS NO SIGN OF BALL ON SEAT. (REEL VOLUME IS 58) SHUT DOWN PUMP AND MOVE PIPE UP 30 FT THEN BACK DOWN TO SETTING DEPTH. PUMP ADDITIONAL 10 BBLS AT 0.5 BPM DOWN THE CT. NO INDICATION OF BALL ON SEAT. 12:10 - 13:00 0.83 DRILL N PROD1 SHUT IN WELL AT CHOKE. PUMP DOWN CT X TBG ANNULUS 0.4 BPM WITH WELL SHUT IN WHILE RECIPROCATING CT. PICK UP 100 FT THEN RUN BACK TO SETTING DEPTH. OPEN WELL BACK UP AND PUMP DOWN CT 0.5 BPM AND ACROSS TOP WITH 2ND PUMP TO KEEP HOLE FULL. / PUMP 10 MORE BBLS AT 0.5 BPM DOWN CT. ✓ START RAMPING PUMP FROM 0 TO 0.75 BPM, UP TO 460 PSI. PUMP 10 MORE BBLS AT 0.75 BPM. PUMPED 115 BBLS SO FAR. 13:00 - 15:00 2.00 DRILL N PROD1 SHUT DOWN AND OPEN BALL DROP PORT, RUN A CABLE PAST"Y"TO ENSURE THE BALL ISN'T HUNG UP THERE. PUMP 10 BBLS HI-VIS MUD AT 0.60 BPM DOWN CT. NO INDICATION OF BALL ON SEAT AFTER ANOTHER 70 BBLS AWAY. 15:00 - 15:20 0.33 DRILL N PROD1 RESET PUMP TRIPS DOWN TO 500 PSI. MAINTAIN 0.4 BPM PUMP RATE AND RECIP PIPE BETWEEN 12660-12680 FT. REPEAT 3 TIMES, NO LUCK. 15:20 - 16:00 0.67 DRILL N PROD1 GET BACK ON DEPTH. USE BAKER CHOKE TO OSCILLATE THE FLOWRATE DOWN THE CT FROM 0 TO 0.7 BPM. SHUT IN WELL AT CHOKE. PUMP DOWN CT X TBG ANNULUS 0.4 BPM, DOWN CT AT 0.3 BPM. MOVE PIPE UPHOLE 200 FT THEN BACK DOWN TO SETTING DEPTH. 16:00 - 18:30 2.50 DRILL N PROD1 PARK AT 12675 FT AND USE A VALVE AT SURFACE TO SURGE THE CT TO 500 PSI. PUMP 10 BBLS 2%KCL WATER AROUND TO TRY AND SHIFT BALL. NO SUCCESS. 18:30 - 19:30 1.00 DRILL N DFAL 12,675.00 PROD1 PJSM.RELEASE CEMENTERS AND CONTAMINATE TRUCK. TAKE ON 290 BBLS 8.6 PPG MUD. PVT=483 BBLS. Printed 12/27/2011 12:38:36PM North America-ALASKA-BP i Page 18 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C:(1,776,101.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:30 - 22:15 2.75 DRILL N DFAL 12,675.00 PROD1 ISOLATE COIL.OPEN BAKER CHOKE. LINE UP AND AND PUMP DOWN KILL LINE- HOLDING WHP WITH THE HAND CHOKE.POH 20 FPM MAINTAINING 200 PSI WHP. SLOW DOWN TO 10 FPM ENTERING SHOE TO 10550 FT JUST ABOVE X-LOC. 22:15 - 22:30 0.25 DRILL N DFAL 12,675.00 PROD1 SHUT OFF PUMP OPEN CHOKE. FLOWCHECK WELL. PVT=440 BBLS.NO FLOW. 1 BBL TO FILL AFTER FLOWCHECK. 22:30 - 00:00 1.50 DRILL N DFAL 12,675.00 PROD1 POH 60 FPM MAINTAINING 50 PSI WHP WITH CHOKE. 11/21/2011 00:00 - 01:20 1.33 DRILL N DFAL 12,675.00 PROD1 POH 60 FPM WITH INFLATABLE CEMENT RETAINER BHA#9. HOLDING 50 PSI WHP WITH CHOKE.PJSM FOR BHA. PREP SAFETY JT. TAG UP. 01:20 - 01:30 0.17 DRILL N DFAL 12,676.00 PROD1 OPEN CHOKE. FLOWCHECK WELL.WELL ON VAC. 01:30 - 02:10 0.67 DRILL N DFAL 12,676.00 PROD1 UNSTAB INJECTOR. PUMP THROUGH KILL LINE TO KEEP HOLE FULL. L/D INFLATABLE CEMENT RETAINER BHA#9. LOOK FOR 1/2"BALL AND INSPECT TOOLS. NO DEBRI OR BALL FOUND.TOOLS CHECK OK. R/U BALL CATCHER. 02:10 - 02:30 0.33 DRILL N DFAL 12,676.00 PROD1 CIRCULATE COIL 2.5 BPM 1430 PSI. HEAR BALL ROLLING.CONFIRMING BALL STILL IN COIL. BALL AT CATCHER IN 12.5 BBLS. RECOVER BALL. CIRCULATE COIL MIN RATE. 02:30 - 03:15 0.75 BOPSUR P PROD1 M/U LUBRICATOR CAP.CLOSE MASTER VALVE. SHELL TEST BOP AGAINST MASTER THEN SWAB VALVE TO 250/3500 PSI 5 MIN EACH. 03:15 - 09:00 5.75 BOPSUR P PROD1 PJSM, LOTO KOOMEY. OPEN BOP DOORS AND INSPECT RAMS. C/O TOP SEALS AND BLADE SEALS ON BLIND RAMS. C/O VARIABLE RAMS. 09:00 - 15:00 6.00 BOPSUR P PROD1 FUNCTION TEST BOPS FROM BOTH REMOTE PANELS. AOP TEST BOPS. TEST WITNESS WAIVED BY • AOGCC JEFF JONES. TEST WITNESSED BY WSL,TOOLPUSHER. TEST CHOKE VALVES,ANNULAR,UPPER AND LOWER 2-3/8"COMBIS,VBR, BLIND/SHEARS,CHOKE HCR AND INSIDE MANUAL VALVE,2 TIW VALVES. ALL COMPONENTS PASS. 15:00 - 15:40 0.67 BOPSUR P PROD1 CHANGE OUT CT STRIPPER ELEMENT. 15:40 - 16:30 0.83 BOPSUR P PROD1 M/U CT RISER AND PRESSURE TEST CT STRIPPER AND INNER REEL VALVE. Printed 12/27/2011 12:38:36PM North America-ALASKA-BP I = Page 19 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:30 - 18:30 2.00 BOPSUR N DFAL 12,676.00 PROD1 LIFT OFF INJECTOR AND MOVE IT ASIDE. INSTALL TREE CAP AND PRESSURE TEST. AGAINST CLOSED CHOKE AND MASTER VALVE.TEST TO 250/3500 5 MIN EACH.OPEN WELL-6BBLS TO FILL. 18:30 - 18:50 0.33 BOPSUR N DFAL 12,676.00 PROD1 FLOWCHECK WELL.CONTINUES ON VAC. PJSM FOR P/U CEMENT RETAINER BHA#10. 18:50 - 20:10 1.33 BOPSUR N DFAL 12,676.00 PROD1 PUMP ACROSS TOP KEEPING HOLE FULL. M/U BHA#10, INFLATABLE CMT RETAINER, SPOTTING VALVE,XO, HDC,XO, 4 JTS 2 1/16"CSH,XO,CTC.WITH 1/2"BALL ON SEAT. M/U INJECTOR.TEST QTS TO 250/3500 PSI. SET PUMP TRIPS TO 500 PSI. 20:10 - 00:00 3.83 LCR N DFAL 12,675.00 PROD1 RIH 60 FPM PUMPING ACROSS TOP TO ENSURE HOLE STAYS FULL. SLOW DOWN TO 10 FPM THROUGH JEWELRY. AT 10500 P/U WT 46K.CONTINUE RIH 10 FPM THROUGH LINER. 11/22/2011 00:00 - 02:30 2.50 LCR N DFAL 12,675.00 PROD1 RIH 10 FPM INSIDE LINER KEEPING HOLE FULL FROM BACKSIDE. EXIT SHOE RIH 10 FPM. 12685 FT P/U WT 50K. CORRECT TO EOP FLAG AT 11500 FT-37.25 FT. P/U TO SETTING DEPTH AT 12675 FT. PVT=511 BBLS. 02:30 - 04:30 2.00 LCR N DFAL 12,675.00 PROD1 CLOSE HCR,CLOSE BAKER CHOKE. SET PUMP TRIP TO 2800 PSI ROLL PUMP 2, PRESSURE UP COIL TO 1200 PSI. PRESSURE UP TO 1700 PSI.SET DOWN 5K. PRESSURE UP-SHEARED AT 2200 PSI. SET DOWN PUSHING RETAINER DOWN HOLE TO 10698 FT. NOTIFY ODE RETAINER WILL MOVE DOWNHOLE. CIRCULATE.23 BPM TO WARM UP RETAINER. ESTABLISH INJECTION RATE 1.34 BPM 930 PSI. FILL ACROSS THE TOP TO CONFIRM ISOLATION ON BACKSIDE. BACKSIDE REMAINS FULL AND NOT LOSING FLUID. 04:30 - 06:00 1.50 LCR N DPRB 12,675.00 PROD1 NOTIFY FIELD SUPERINTENDANT AND ODE OF INFLATABLE RETAINER MOVMENT. WAIT ON DECISION FROM TOWN ON PLAN FORWARD BEFORE CONTINUING OPERATIONS.CIRCULATE MIN RATE DOWN COIL AT.23 BPM. 06:00 - 06:30 0.50 LCR N DPRB 12,675.00 PROD1 CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO CIRCULATE DOWN COIL. 06:30 - 09:00 2.50 LCR N DPRB 12,675.00 PROD1 DISCUSS OPTIONS WITH TOWN TEAM. 09:00 - 10:00 1.00 LCR N DPRB 12,675.00 PROD1 ATTEMPT TO STACK WEIGHT ON RETAINER. HELD SOLID WITH 9K#DOWN WEIGHT. 12,700.8' ORDER HOT KCL AS CONTINGENCY. Printed 12/27/2011 12:38:36PM \forth America -ALASKA- BP Page 20 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 15:00 5.00 LCR N DPRB 12,675.00 PROD1 WAIT ON WSL CHANGE OUT. CONTINUE TO PUMP DOWN COIL AT 0.53 BPM. CIRC PRESSURE SLOWLY CLIMBED FROM+/- 250 PSI TO 595 PSI. 15:00 - 18:00 3.00 LCR N DPRB 12,675.00 PROD1 HOLD PJSM. DISCUSS PUMP SCHEDULE. RU SLB CEMENTERS. MIX ADDITIONAL 2# BIOZAN IN PITS. LOAD ADDITIONAL MUD IN TO PITS. 18:00 - 19:00 1.00 LCR N DPRB 12,675.00 PROD1 WAIT ON CREW CHANGE. SLB COIL,SLB CEMENTERS, NORDIC. 19:00 - 20:00 1.00 LCR P PROD1 PJSM WITH CEMENTERS,RIG CREW,BTT, CH2MHILL TRUCK DRIVERS,SCS. DISCUSS PLAN FORWARD AND PLAN FORWARD CONTINGENCY PLAN. 20:00 - 22:30 2.50 LCR P PROD1 FOLLOW OPS NOTE FROM TOWN. WITH BACKSIDE FULL.PRESSURE UP BACKSIDE TO 100 PSI AND SHUT IN. BATCH UP 10 BBLS CMT.CMT BATCHED AT 20:20.SEND SAMPLE TO SLB LAB.PUMP 5 BBLS 8.4 PPG KCL AND FILL LINES.SHUT IN VALVE AT REEL. PT CEMENT LINES 1000/6500 PSI.CHECK TRIPS AT 1000 PSI.BLEED OFF PRESSURE.OPEN VALVE AT REEL. PUMP ANOTHER 5 BBLS 8.4 PPG KCL.20:50 WHP= , f 95 PSI, PUMP 10 BBLS 15.8 PPG CLASS G v""` CMT 1.6 BPM 1480 PSI TO 1900 PSI.SWAP TO RIG PUMP. PUMP 20 BBLS 8.4 PPG 2%KCL ��L,a WITH 2PPB BIOZAN.SWAP TO 8.5 PPG MUD. INJECT CMT TO CMT RETAINER 1.78 BPM 1650 PSI. AT 49 BBLS AWAY PRESSURE CLIMBING TO 1800 PSI.SLOW PUMP TO.84 BPM 950 PSI BEFORE CMT GOING THROUGH RETAINER.PUMP.78 BPM WITH PRESSURE INCREASING TO 1650 PSI SQUEEZING 9.5 BBLS CMT-PUMPING 67 BBLS TOTAL TO DISPLACE.WHP REMAINS AT 100 PSI.SHUT DOWN PUMP, P/U TO 57K AT 6K OVER- ATTEMPT TO RELEASE FROM RETAINER. BLEED OFF 100 PSI ON BACKSIDE. P/U SLOWLY PUMPING DOWN COIL-NO RETURNS.RETAINER DID NOT RELEASE. PRESSURE UP BACKSIDE 2 TIMES TO 1100 PSI. RELEASED AT 68K P/U ON SECOND TRY, BROKE OVER TO P/U WT 50K.PUMP DOWN COIL.HAVE FULL RETURNS AT SURFACE. TOP OF CMT RETAINER AT 12665 FT. 22:30 - 23:30 1.00 LCR P PROD1 CIRCULATE DOWN COIL 1 BPM. 1/1 RETURNS INCREASE RATE TO 2 BPM 1450 PSI. LOSSES 7/10 BPM PUMPING 2 BPM.REDUCE RATE, PUMPING 1 BPM 700 PSI LOSSES AT.5 BPM. PVT=416 BBLS. 23:30 - 00:00 0.50 LCR P PROD1 POH 25 FPM TO SHOE AT 11539 FT CBU. PAINT WHITE EOP FLAG 11766' POH 18 FPM IN LINER. 11/23/2011 00:00 - 03:00 3.00 LCR P PROD1 POH 18 FPM PUMPING 1 BPM 650 PSI. LOSSES AT.3 BPM INSIDE LINER. POH ABOVE X-LOC.AT 10550 FT. Printed 12/27/2011 12:38:36PM North America ALASKA- BP Page 21 of 21 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/6/2011 End Date: X3-010MV-C: (1,776,101.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00©68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 03:15 0.25 LCR P PROD1 FLOWCHECK WELL. NO FLOW. PVT=320 BBLS. 03:15 - 06:00 2.75 LCR P PROD1 POH 75 FPM PUMPING 1 BPM 600 PSI. 06:00 - 06:30 0.50 LCR P PROD1` CREW CHANGE. DISCUSS RIG STATUS AND CURRENT OPS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO POOH. 06:30 - 07:00 0.50 LCR P PROD1 CONTINUE TO CIRCULATE OUT OF HOLE. 07:00 - 08:00 1.00 LCR P PROD1 AT SURFACE. FLOW CHECK WELL. GET OFF WELL. UNSTAB COIL. STATIC LOSS RATE APPROX 8 BPH. 08:00 - 08:30 0.50 CASING P PROD1 HOLD PJSM TO DISCUSS PLAN FORWARD REGARDING LINER. ALSO DISCUSS PUMPING SLACK. REVIEW HOLE FILL PROCEDURE. 08:30 - 11:00 2.50 CASING P PROD1 REVERSE CIRC SLACK. CUT 240'OF COIL. NO WIRE CUT. RD CUTTER. CONTINUE TO FILL AND MONITOR WELL. LOSS RATE APPORX 10 BBLS/HR. CONTINUE TO CIRC COIL EVERY 30 MIN DUE TO COLD WEATHER. 11:00 - 17:00 6.00 CASING P PROD1 RE-HEAD E-CONNECTOR. SHORT FOUND. TEST CABLE ETC. FOUND NICK IN CONDUCTOR. RE-MAKE UP FLOW TUBE SUB. 17:00 - 18:50 1.83 CASING P PROD1 CUT OFF ANCHOR AND INSTALL NEW BOOT. GOOD TEST-48 OHMS. PULL TEST CTC TO 35K, PT TO 3500 PSI. 18:50 - 20:00 1.17 CASING P PROD1 M/U INJECTOR. PRESSURE TEST DFCV AND QTS. 250/3500 PSI FOR 5 MIN EACH. 20:00 - 21:00 1.00 CASING P PROD1 UNSTAB INJECTOR AND SET ON LEGS. PUMP SLACK FORWARD. FILL PULSATION DAMPER WITH N2 ON MP 2. Printed 12/27/2011 12:38:36PM North America -ALASKA- BP Page 1 of 2 Operation Summary Report Common Well Name:06-12 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/13/2011 End Date: X3-010MV-C: (574,667.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00©68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/23/2011 21:00 - 23:20 2.33 CASING P RUNPRD PJSM FOR RUNNING LINER. R/U AND RUN GUIDE SHOE,23 JTS 2 3/8" SLOTTED LINER,DEPLOYMENT SLEEVE, GS, PJSM-M/U COIL TRAC.BLIND SUB, DGS, DPS, EDC,PC,WS, LQC,UQC,CTC. M/U INJECTOR 23:20 - 23:40 0.33 CASING P RUNPRD TEST QTS TO 250/3500 PSI 5 MIN EACH. PVT=302 BBLS/ 23:40 - 00:00 CASING P RUNPRD RIH 70 FPM WITH BHA#11 PUMPING DOWN COIL.65 BPM 400 PSI. 11/24/2011 00:00 - 04:05 4.08 CASING P RUNPRD RIH WITH 23/8"SLOTTED LINER BHA#11 AT 70 FPM. PUMPING.42 BPM DOWN COIL 366 PSI. PUMP.5 BPM ACROSS BACKSIDE TO KEEP HOLE FULL. RIH TO 10550'P/U WT 42K. RIH 10 FPM BEFORE PASSING X-LOC AND TOL. RIH TO 11535'LOG TIE IN.-30.5 FT CORRECTION. 04:05 - 06:00 1.92 CASING P RUNPRD RIH 10 FPM PUMPING.5 BPM DOWN COIL, 400 PSI TO 12245'. PUMPING.3 BPM DOWN BACKSIDE TO MAINTAIN RETURNS. CLOSE EDC.PUMP.36 BPM 420 PSI. CONTINUE RIH TO 12600'P/U WT 45K. RIH TO 12710 FT.TALK WITH ODE. CONTINUE RIH. 06:00 - 06:30 0.50 CASING P RUNPRD TAG BTM AT 12787'WITH 5K#DN WT. PU TO NETRAL. CIRC AT 1.5 BPM AND RELEASE FROM LINER. CREW CHANGE. 06:30 - 11:00 4.50 CASING P RUNPRD POOH SLOWLY. PUMP 0.67 BPM DN COIL AND 0.5 BPM DN CT ANNULUS. HOLD PJSM WITH CREW TO DISCUSS TRIPPING WITH LOSS PROCEDURE. POOH MONITOR LOSSES. FILL DN COIL AND CT ANNULUS. FLOW CHECK ABOVE TOL. 11:00 - 12:00 1.00 CASING P RUNPRD AT SURFACE. FLOW CHECK. HOLD PJSM. GET OFF WELL. UNSTAB COIL. LD BHI AND BTT TOOLS. 12:00 - 13:00 1.00 CASING P RUNPRD RU FLOOR TO RUN LINER. HOLD DETAILED PJSM. 13:00 - 15:00 2.00 CASING P RUNPRD MU 16 JTS 2-3/8"L-80 SLOTTED ON BHI BHA. SCRIBE TO ANCHOR SLIP. MONITOR HOLE. FILL HOLE EVERY 30 MIN. STAB COIL. TEST TOOLS. GET ON WELL. Printed 12/27/2011 12:38:56PM North America -ALASKA- BP Page 2 of 2 Operation Summary Report Common Well Name:06-12 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/13/2011 End Date: X3-010MV-C:(574,667.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 21:00 6.00 CASING P RUNPRD RIH TO 10550 FT PUMPING THROUGH OPEN EDC.35 BPM 320 PSI.70 FPM. PUMP DOWN BACKSIDE.5 BPM TO KEEP HOLE FULL. P/U WT 43K. RIH 10 FPM PAST X-LOC AND IN LINER. RIH TO 11370',TIE IN LOG.-29.5 FT CORRECTION. RIH,12050 FT P/U WT 47.5K,S/O 22K.CLOSE EDC. 21:00 - 21:15 0.25 CASING P RUNPRD RIH,TAG TOP OF LOWER LINER AT 12087 FT SETTING 5K. P/U TO BREAKOVER+1 FT.AT 12081.5 FT. PRESSURE UP SHEAR 3100 PSI.SET DOWN TO 12087 FT. P/U TO 12080 FT. BREAKOVER 39K. CONFIRMING WITH DHWOB SENSOR. TOP BILLET SET AT 11586.28 FT. BILLET SET AT 90 DEG LHS. PVT=398 BBLS. 21:15 - 22:50 1.58 CASING P RUNPRD POH 10 FPM PUMPING.78 BPM 700PSI. DOWN COIL. CONTINUE FILLING FROM BACKSIDE.37 BPM TO KEEP HOLE FULL. POH ABOVE X-LOC.POH TO 10529 FT. 22:50 - 23:05 0.25 CASING P RUNPRD FLOWCHECK WELL.WELL CONTINUES TAKING. 4 BBLS TO FILL HOLE AFTER FLOW CHECK. 23:05 - 00:00 0.92 CASING P RUNPRD POH 70 FPM PUMPING DOWN COIL.8 BPM 550 PSI. PUMP DOWN BACKSIDE.33 BPM TO KEEP HOLE FULL. Printed 12/27/2011 12:38:56PM 7 e 7 d yea t[ °.� sly'"E�q; �—�� � 168 �.{ �. � _ € ll Cn Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/11/2011 End Date: X3-010MV-C: (3,694,537.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00©68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/25/2011 00:00 - 01:30 1.50 CASING P PROD1 POH WITH LINER RUNNING TOOLS 70 FPM. FILL BACKSIDE.48 BPM, PUMPING DOWN COIL.8 BPM 670 PSI. TAG UP. 01:30 - 01:45 0.25 CASING P PROD1 PJSM FOR BHA FLOWCHECK WELL 01:45 - 03:40 1.92 DRILL P PROD1 UNSTAB INJECTOR. L/D LINER RUNNING TOOLS. M/U BHA#13.BI-CENTER BIT,2 3/8"X-TREME MOTOR WITH 2 DEG AKO, HOT,USR, DGS, DPS, EDC,PC,WS, LQC, UQC, CTC. M/U INJECTOR.TEST TOOLS.TEST QTS. PVT=419 BBLS. 03:40 - 04:00 0.33 DRILL P PROD1 OPEN EDC.RIH PUMPING.65 BPM 85 FPM. TO 1000 FT. NOISE COMMING FROM#2 MP TRACTION MOTOR. SWITCH TO MP#1 04:00 - 04:20 0.33 DRILL P PROD1 CALL OUT RIG ELECTRICIAN TO DIAGNOSE MP#2 TRACTION MOTOR. NOTIFY FIELD SUPERINTENDANT. GET APPROVAL TO RIH TO 10500 FT JUST ABOVE X-LOC AND CIRCULATE THROUGH EDC. 04:20 - 06:00 1.67 DRILL P PROD1 CONTINUE RIH TO TOP OF X-LOC 06:00 - 09:00 3.00 DRILL P PROD1 CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO RIH. CONTINUE TO EVALUATE MP#2 TRACTION MOTOR. 09:00 - 12:00 3.00 DRILL N RREP 10,346.00 PROD1 CIRCULATE COIL AT MIN RATE. 0.59 BPM IN/ 0.18 BPM OUT @ 410 PSI. PVT:403 BBLS. HOLD PJSM TO REMOVE MP#2 ACCESS PLATE. UNABLE TO FIND SOURCE OF UNUSUAL NOISE. CHECK BELTS, BEARINGS, PULLEYS AND ELECTRICS. NO TROUBLE FOUND. REPLACE ACCESS PLATES. 12:00 - 13:00 1.00 DRILL P PROD1 RUN IN HOLE. LOG GR TIE IN. -29.5'CORRECTION. TAG BILLET AT 11,584'. 13:00 - 16:00 3.00 DRILL P PROD2 TIME MILL BILLET AT 1'PER HR. TF:85L. 1582 PSI FS AT 1.64 BPM IN/1.08 BPM OUT. BHP/ECD/TVD:4145 PSI/9.17 PPG/8706'. IA/OA/PVT:21 PSI/38 PSI/294 BBLS. 16:00 - 17:15 1.25 DRILL P PROD2 DRILL AHEAD FROM 11,585'. 1:1 RTNS. CALL FOR FULL MUD SWAP TO 50-55 KLSRV MUD. DRILLING TO 11683' PUMP 20 BBL HI VIS SWEEP. 17:15 - 18:30 1.25 DRILL P PROD2 WIPER TRIP TO 3 3/16"LINER SHOE AT 11555'. PUMP OFF WHEN PASSING BILLET. CLEAN WIPER.CONTINUE WITH 1/1 RETURNS. Printed 12/27/2011 12:39:16PM forth America -ALASKA- BP Page 2 of 7 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/11/2011 ' End Date: X3-010MV-C: (3,694,537.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:30 - 20:45 2.25 DRILL P PROD2 ON BOTTOM DRILLING FROM 11683' F/S= 1.6 BPM 1745 PSI.MOTOR WORK 250 PSI. DHWOB= 1.2K. ROP 50 FPH. ECD=9.69 PPG. PVT=397 BBLS.WHP=33 PSI,AP=4369 PSI. WITH 1/1 RETURNS. HI VIS SWEEP AT SURFACE NOTED SMALL SLIVERS OF ALUM. DRILLING TO 11781'. PUMP 20 BBL HI VIS SWEEP. 20:45 - 21:10 0.42 DRILL P PROD2 WIPER TRIP TO 3 3/16"LINER SHOE AT 11555'. PUMP OFF WHEN PASSING BILLET. CLEAN WIPER.CONTINUE WITH 1/1 RETURNS. 21:10 - 23:00 1.83 DRILL P PROD2 ON BOTTOM DRILLING FROM 11781' F/S=1.62 BPM 1750 PSI.250 PSI MOTOR WORK. DHWOB=1.7K.ROP 60 FPH.ECD=9.73 PPG. PVT=459 BBLS.WHP=44 PSI,AP=5088 PSI. IA=435 PSI.OA=63 PSI. WITH 1/1 RETURNS. PUMP 10 BBLS HI VIS SWEEP. DRILL TO 11881' START MUD SWAP TO 8.5 PPG POWER PRO MUD W/50K LSRV. 23:00 - 00:00 1.00 DRILL P PROD2 WIPER TRIP TO 3 3/16"LINER SHOE AT 11555'. PUMP OFF WHEN PASSING BILLET. OPEN EDC AT 11554' PUMP 2 BPM 1550 PSI. HOLE TAKING.4 BPM. POH 10 FPM FOR TIE IN AT 10855'. 11/26/2011 00:00 - 02:00 2.00 DRILL P PROD2 WIPER TRIP FROM 11881' POH 10 FPM TO 10855'. LOG TIE IN.+2.5'CORRECTION. RIH 10 FPM IN LINER TO 11532'.CLOSE EDC. PUMP OFF THROUGH BILLET. DURING AND AFTER WIPER TRIP LOSSES AT .4 BPM. MUD SWAP COMPLETE. 02:00 - 05:00 3.00 DRILL P PROD2 RECORD SPR 1 AND 2 MP. ON BOTTOM DRILLING FROM 11881' F/S=1.6 BPM 2200 PSI.250 PSI MOTOR WORK. DHWOB= 1.8K. ROP 50 FPH. ECD=9.78 PPG. PVT=459 BBLS.WHP=26 PSI,AP=5068 PSI. IA=430 PSI.OA=78 PSI. LOSS RATE INCREASE TO.7 BPM. _ DRILL TO END OF BUILD SECTION AT 12030' 05:00 - 06:00 1.00 DRILL P PROD2 POH FOR LATERAL BHA. 06:00 - 06:30 0.50 DRILL P PROD2 CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO POOH. 06:30 - 09:30 3.00 DRILL P PROD2 CONTINUE TO POOH. 09:30 - 10:30 1.00 DRILL P PROD2 AT SURFACE. FLOW CHECK WELL. DETERMINE LOSS RATE AT 12 BPH. HOLD PJSM TO GET OFF WELL AND CHANGE AKO TO 1 DEG. BIT GRADE= 1 /1 /NO/A/X/I/NO/BHA. Printed 12/27/2011 12:39:16PM North America -ALASKA - BP Page 3 of 7 Operation Summary Report Common Well Name:06-12 'AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/11/2011 End Date: X3-010MV-C: (3,694,537.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum:19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:30 - 13:00 2.50 BOPSUR P PROD2 WEEKLY FUNCTION TEST OF BOPS. PERFORM DERRICK INSPECTION WITH BP AUDIT TEAM. MODIFY DOG HOUSE PURGE SYSTEM. 13:00 - 16:45 3.75 DRILL P PROD2 HOLD PJSM. MU INTEQ TOOLS. RE-RUN BI-CENTER BIT. STAB COIL.TEST TOOLS. GET ON WELL. RUN IN HOLE 16:45 - 17:00 0.25 DRILL P PROD2 WT CHECK AT 10850'. LOG GR TIE IN FROM 10,875'. 29'CORRECTION. 17:00 - 18:15 1.25 DRILL P PROD2 RUN IN HOLE AT 25 FPM. 18:15 - 19:30 1.25 DRILL P PROD2 ON BOTTOM DRILLING FROM 12030' F/S=1.62 BPM 1900 PSI.250 PSI MOTOR WORK. DHWOB= 1.6K.ROP=90 FPH. ECD=9.85 PPG. PVT=360 BBLS.WHP=26 PSI,AP=4452 PSI. IA=480 PSI.OA= 160 PSI. LOSS RATE= .5 BPM. DRILL TO 12150' 19:30 - 20:25 0.92 DRILL P PROD2 WIPER TRIP FROM 12150'TO SHOE. PVT=330 BBLS.LOST 27 BBLS ON WIPER. 20:25 - 21:45 1.33 DRILL P PROD2 ON BOTTOM DRILLING FROM 12150' F/S= 1.62 BPM 1900 PSI.250 PSI MOTOR WORK. DHWOB= 1.6K.ROP=90 FPH. ECD=9.87 PPG. PVT=297 BBLS.WHP=26 PSI,AP=4452 PSI. IA=480 PSI.OA= 160 PSI. LOSS RATE=.5 BPM. DRILL TO 12250' 21:45 - 23:10 1.42 DRILL P PROD2 WIPER TRIP FROM 12250'TO SHOE. CLEAN WIPER. PVT=261 BBLS. 23:10 - 00:00 0.83 DRILL P PROD2 ON BOTTOM DRILLING FROM 12250' F/S= 1.64 BPM 1890 PSI.350 PSI MOTOR WORK. DHWOB=2K.ROP=95 FPH.ECD=9.87 PPG. PVT=213 BBLS.WHP=33 PSI,AP=4453 PSI. IA=105 PSI.OA=52 PSI. LOSS RATE=.5 BPM DRILL TO 12352' 11/27/2011 00:00 - 01:00 1.00 DRILL P PROD2 WIPER FROM 12352'TO SHOE. CLEAN WIPER. 01:00 - 01:30 0.50 DRILL P PROD2 ON BOTTOM DRILLING FROM 12352' F/S=1.6 BPM 1750 PSI.300 PSI MOTOR WORK. DHWOB=2.1K.ROP=90 FPH.ECD=9.8 PPG. PVT=306 BBLS.WHP=29 PSI,AP=4431 PSI. IA=72 PSI.OA=52 PSI. LOSSES AT.5 BPM. DRILLING TO 12375'-LOSSES INCREASING TO 1.2 BPM. Printed 12/27/2011 12:39:16PM Vorth America -ALASKA- BP Page 4 of 7 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/11/2011 End Date: X3-010MV-C: (3,694,537.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:30 - 02:30 1.00 DRILL P PROD2 NOTIFY ODE,WTL AND FIELD SUPERINTENDANT. WITH ENOUGH DRILLING FLUID ON LOCATION- 580 BBLS 8.5 PPG MUD ON 2-VAC TRUCKS. PVT=300 BBLS. REVIEW RP GUIDLINES FOR LOSS CIRCULATION. DECISION MADE TO DRILL AHEAD. CONTINUE WITH WIPER TRIPS EVERY 100' DRILL TO 12475'. TAKE ON FLUID. PVT=462 BBLS. 02:30 - 06:00 3.50 DRILL P PROD2 WIPER TRIP FROM 12475'FOR TIE IN LOG. REDUCE PUMP TO MIN PASSING BILLET. OPEN EDC AT 11550' POH 10 FPM IN 3 3/16"LINER. PUMPING 1.6 BPM 1300 PSI. TIE IN LOG AT 10850'+5'CORRECTION. RIH.LOSSES 1.3 BPM DURING WIPER TRIP. PUMP OFF WHEN PASSING BILLET. 06:00 - 06:30 0.50 DRILL P PROD2 CREW CHANGE. DISCUSS RIG STATUS AND CURRENT OPS. MAKE OUTSIDE ROUNDS. CONTINUE WIPER TRIP TO BTM. 06:30 - 07:30 1.00 DRILL P PROD2 CONTINUE WIPER TRIP TO BTM. 07:30 - 08:00 0.50 DRILL P PROD2 DRILL AHEAD FROM 12,475' 1800 PSI FS AT 1.6 IN/0.58 BPM OUT. 200-300 PSI MTR WORK. BHP/ECD/TVD:4386 PSI/9.61 PPG/8716' IA/OA/PVT:-7 PSI/48 PSI/211 BBLS (VARIABLE,FLUID XFER TO ISOLATED PIT) DRILL 10 12,575'. 08:00 - 09:30 1.50 DRILL P PROD2 WIPER TRIP TO 11,555'. 1794 PSI FS AT 1.7 BPM IN. HOLE AND WT X-FER SMOOTH. 09:30 - 11:30 2.00 DRILL P PROD2 DRILL AHEAD FROM 12,575'. 2029 PSI FS AT 1.62 BPM IN/0.58 BPM OUT. WEIGHT TRANSFER ADEQUATE. DRILL TO 12,675'. 11:30 - 13:00 1.50 DRILL P PROD2 WIPER TRIP TO WINDOW. 1760 PSI AT 1.62 BPM IN. HOLE SMOOTH. 13:00 - 14:30 1.50 DRILL P PROD2 DRILL AHEAD FROM 12675'. 1800 PSI FS AT 1.61 BPM IN. OUT RATE VARIABLE. LOST ALL RTNS AT 12735'. DISCUSS WITH TOWN. PLAN TO SWAP TO 2%KCL WITH 776. ALSO PUMP SWEEPS EVERY 50'DRILLED AND ON WIPER TRIPS. DRILL AHEAD TO 12,775'. 14:30 - 16:45 2.25 DRILL P PROD2 WIPER TRIP TO SHOE. 1505 PSI FS AT 1.65 BPM IN. NO RTNS. HOLE SMOOTH. Printed 12/27/2011 12:39:16PM North America-ALASKA- BP i Page 5 of 7 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/11/2011 End Date: X3-010MV-C:(3,694,537.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:45 - 18:30 1.75 DRILL P PROD2 DRILL AHEAD FROM 12,775'. F/S=1.63 BPM 1450 PSI.250 PSI MOTOR WORK. .16 BPM RETURNS. DHWOB= 1.5K. ROP=75 FPH. ECD=9.9 PPG. PVT=276 BBLS.WHP=18 PSI, IA=0 PSI.OA=46 PSI. DRILL AHEAD TO 12875' 18:30 - 23:15 4.75 DRILL P PROD2 WIPER FROM 12875'TO SHOE. REDUCE PUMP TO MIN PASSING BILLET. OPEN EDC AT 11550' POH 10 FPM IN 3 3/16"LINER. PUMPING 1.6 BPM 1300 PSI. TIE IN LOG AT 10850'+8.5'CORRECTION. RIH.CLOSE EDC AT 11550'. PUMP OFF WHEN PASSING BILLET.CLEAN WIPER. • CONTINUE PUMPING SWEEPS EVERY 50' DRILLED AND ON WIPER TRIPS. 23:20 - 00:00 0.67 DRILL P PROD2 DRILL AHEAD FROM 12875'TO 12918'. 1.68 BPM IN/23 BPM OUT.WT TRANSFER OK. PVT=341 BBLS. 11/28/2011 00:00 - 01:00 1.00 DRILL P PROD2 DRILL AHEAD FROM 12,918'. F/S= 1.63 BPM 1600 PSI.250 PSI MOTOR WORK. .16 BPM RETURNS. DHWOB= 1.5K. ROP=75 FPH. ECD=9.9 PPG. PVT=385 BBLS.WHP= 15 PSI, IA=0 PSI.OA=46 PSI. DRILL AHEAD TO 12975' CONTINUE PUMPING SWEEPS EVERY 50' DRILLED AND ON WIPER TRIPS. 01:00 - 03:00 2.00 DRILL P PROD2 WIPER TRIP TO SHOE FROM 12975' CLEAN WIPER. PVT=403 BBLS. 03:00 - 04:50 1.83 DRILL P PROD2 DRILL AHEAD FROM 12,975'. F/S= 1.65 BPM 1550 PSI.350 PSI MOTOR WORK. 24 BPM RETURNS. DHWOB= 1.5K. ROP=100 FPH.ECD=9.3 PPG. PVT=248 BBLS.WHP= 15 PSI, IA=0 PSI.OA=46 PSI. RECORD SPR 1 AND 2 MP. PULL TIGHT AT 13047' 04:50 - 06:00 1.17 DRILL P PROD2 TIGHT AT 13045'-WORK PIPE PULLING 90K. PULL FREE. WIPER TO SHOE 06:00 - 06:30 0.50 DRILL P PROD2 CREW CHANGE. DISCUSS CURRENT OPS AND RIG STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE WIPER TRIP BACK TO BTM. 06:30 - 07:30 1.00 DRILL P PROD2 CONTINUE WIPER TRIP. 1183 PSI FS AT 1.57 BPM IN. HOLE MOSTLY SMOOTH. 07:30 - 08:30 1.00 DRILL P PROD2 DRILL AHEAD TO 13167'. PUMP HI-VIS SWEEP EVERY 50'. 08:30 - 09:30 1.00 DRILL P PROD2 WIPER TRIP TO 3-3/16"SHOE. HOLE SMOOTH. 09:30 - 15:00 5.50 DRILL P PROD2 TOWN NOTIFIED RIG TO PULL INTO TUBING AND CIRCULATE. IMT RESPONDING TO H2S INCIDENT AT NORDIC 1 RIG. CLEARED TO RETURN TO WORK BY TOWN. Printed 12/27/2011 12:39:16PM Vorth America -ALASKA- BP Page 6 of 7 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/11/2011 End Date: X3-010MV-C: (3,694,537.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 15:15 0.25 DRILL P PROD2 LOG GR TIE IN. ADD 26'. 15:15 - 17:15 2.00 DRILL P PROD2 CLOSE EDC. RUN IN HOLE. HOLE SMOOTH TO BTM. 17:15 - 18:30 1.25 DRILL P PROD2 DRILL AHEAD FROM 13,167'. 1250 PSI FS AT 1.67 BPM IN. NO RTNS. DRILL TO 13300' NO RETURNS.SHUT IN CHOKE. 18:30 - 20:50 2.33 DRILL P PROD2 WIPER TRIP FROM 13300'TO SHOE. RIH,STACK 3K AT 11800' OTHERWISE CLEAN. 20:50 - 22:30 1.67 DRILL P PROD2 DRILLING AHEAD FROM 13300' CONTINUE PUMPING HI VIS SWEEPS EVERY 50'DRILLED AND ON WIPER TRIPS. NO RETURNS, CHOKE CLOSED. FS=1150 PSI 1.67 BPM.250 PSI MOTOR WORK. DHWOB=3.7K. ROP=70 FPH. ECD=8.82 PPG. PVT=445 BBLS.WHP=0 PSI, IA=0 PSI.OA=40 PSI. DRILLING TO 13400' 22:30 - 00:00 1.50 DRILL P PROD2 WIPER TRIP FROM 13400'TO SHOE. NO RETURNS AND CHOKE REMAINS CLOSED. 11/29/2011 00:00 - 00:50 0.83 DRILL P PROD2 WIPER TRIP FROM 13400'TO SHOE. NO RETURNS AND CHOKE REMAINS CLOSED. CLEAN WIPER. 00:50 - 03:00 2.17 DRILL P PROD2 DRILLING AHEAD FROM 13400' CONTINUE PUMPING HI VIS SWEEPS EVERY 50'DRILLED AND ON WIPER TRIPS. NO RETURNS,CHOKE CLOSED. FS= 1175 PSI 1.7 BPM.250 PSI MOTOR WORK. DHWOB=3K.ROP=80 FPH.ECD=8.83 PPG. PVT=377 BBLS.WHP=0 PSI, IA=0 PSI.OA=40 PSI. DRILLING TO 13500' SHORT WIPERS UP TO 100'TO GET WT TRANSFER TO BIT. 03:00 - 05:30 2.50 DRILL P PROD2 WIPER TRIP FROM 13500'TO SHOE. NO RETURNS AND CHOKE REMAINS CLOSED. 05:30 - 06:00 0.50 DRILL P PROD2 DRILLING AHEAD FROM 13500' 06:00 - 06:30 0.50 DRILL P PROD2 CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO DRILL AHEAD. 06:30 - 09:00 2.50 DRILL P PROD2 DRILL AHEAD FROM 13,535'. 1200 PSI FS AT 1.78 BPM IN/0 BPM OUT.200 PSI MTR WORK. DHWOB:2.3-2.75 K#. BHP/TVD/ECD:3909 PSI/8.63 PPG/8722' IA/OA/PVT:-7 PSI/40 PSI/297 BBLS (VARIABLE). DRILL AHEAD WITH CHOKE SHUT IN. DRILL AHEAD TO 13,630'. 09:00 - 13:00 4.00 DRILL P PROD2 WIPER TRIP TO WINDOW. LOG GR TIE IN. ADD 3'CORRECTION. RIH. SMOOTH TO NEAR TD. Printed 12/27/2011 12:39:16PM North America-ALASKA- BP Page 7;of 7 Operation Summary Report Common Well Name:06-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/11/2011 End Date: X3-010MV-C:(3,694,537.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 16:00 3.00 DRILL P PROD2 DRILL AHEAD FROM 13,630'. DIFFICULT TO GET BHA MOVING SMOOTHLY TO DRILL AHEAD. MAKE SEVERAL SHORT WIPER TRIPS. OPEN CHOKE AND LINE UP TO FILL ACROSS TOP. TOOK 3-4 BBLS TO ESTABLISH RTNS. CONTINUE TO CIRC ACROSS TOP AT 0.34 BPM. 16:00 - 17:30 1.50 DRILL P PROD2 CONTINUE TO DRILL AHEAD FROM 13655'. 1143 PSI FS AT 1.68 BPM IN. 0.17 BPM OUT WITH PUMP#2 CIRC AT 0.38 BPM ACROSS WELL TOP OF WELL. TD CALLED AT 13698'UNCORRECTED. 17:30 - 22:00 4.50 DRILL P PROD2 WIPER TRIP TO TIE IN POINT. CONTINUE TO CIRC 1.62 BPM DOWN COIL, 0.3 TO 0.7 DOWN CT ANN. MAINTAIN BACKSIDE RATE TO KEEP MIN RETURNS. TIE IN AT+7'CORRECTION. 22:00 - 00:00 2.00 DRILL P PROD2 RIH TO CONFIRM DEPTH. Printed 12/27/2011 12:39:16PM North America -ALASKA- BP Page 1 of 2 Operation Summary Report Common Well Name: 06-12 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/20/2011 End Date: 12/1/2011 X3-010MV-C:(574,667.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum:19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/30/2011 00:00 - 01:00 1.00 DRILL P PROD2 RIH AND TAG TD DEPTH OF 13693' 01:00 - 04:15 3.25 DRILL P PROD2 POH TO 10,500' FILLING WITH PUMP 1 DOWN COIL AT 1.4 BPM AND PUMP 2 DOWN ANNULI AT 1.48 BPM OUT RATE OF 1.08 BPM. FLAG EOP AT 11320'AND 9276' 100'ABOVE TD WITH NEXT BHA AND 100'ABOVE BILLET WITH NEXT BHA. 04:15 - 04:45 0.50 DRILL P PROD2 STOP AND MONITOR WELL. BRING PUMP RATE DOWN AND DIAL IN RATE TO MAINTAIN 3650 PSI BHP WITH INTEQ TOOLS. RATE AT 0.5 BPM TO MAINTAIN 3650 PSI BHP ACCORDING TO INTEQ. FILL HOLE AND MONITOR. 04:45 - 06:00 1.25 DRILL P PROD2 POOH TO L/D DRILLING BHA 06:00 - 06:30 0.50 DRILL P PROD2 CREW CHANGE. DISCUSS CURRENT OPS AND RIG STAUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO POOH. 06:30 - 07:30 1.00 DRILL P PROD2 POOH. CIRC 2.13 BPM DOWN COIL. 1.1 BPM DOWN CT ANN. HOLD PJSM NEAR SURFACE. 07:30 - 08:30 1.00 DRILL P PROD2 FLOW CHECK. GET OFF WELL. UNSTAB COIL. LD TOOLS. ATTEMPT TO FILL HOLE. UNABLE TO DO SO AT 4 BPM. DISCUSS WITH TOWN. DECIDE TO FOLLOW ROTARY STANDARD OF FILLING AT 1 BPM WHILE AT SURFACE. 08:30 - 12:00 3.50 CASING P PROD2 HOLD PJSM TO DISCUSS PU OF LINER. COMPLETE RU OF FLOOR. VERIFY SAFETY JOINT READY. MU 73 JTS 2-3/8"4.4#I-80 STL SLOTTED PIPE WITH 0-RING SUB AND SHORT DEPLOYMENT SLEEVE. PU INTEQ TOOLS. STAB PIPE. TEST TOOLS. GET OF WELL. 12:00 - 17:00 5.00 CASING P PROD2 RUN IN HOLE. SMOOTH TO TD AT 13,693'. 52K#UP WT. CLOSE ECD. CIRC AT 1.5 BPM. PU. RELEASED FROM LINER. 17:00 - 21:00 4.00 CASING P PROD2 CIRCULATE OUT OF HOLE. 0.8 BPM DOWN CT. 2.14 BPM DOWN CT ANN. MAINTAIN RTNS WHILE POOH. HOLD PJSM FOR LID BHA. TAG UP.MONITOR WELL.ON A VAC.BREAK OFF INJECTOR. 21:00 - 22:00 1.00 CASING P PROD2 L/D BHA M/U NOZZLE 22:00 - 00:00 2.00 CASING P PROD2 DISPLACE WELL TO 1%KCL PUMP AT 3.6 BPM WITH 190 PSI AND 180 WELL HEAD PSI. R/U LRS. Printed 12/27/2011 12:39:31 PM North America -ALASKA- BP Page 2 of 2 Operation Summary Report Common Well Name:06-12 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/20/2011 End Date: 12/1/2011 X3-010MV-C: (574,667.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI: Active Datum: 19: 12 7/7/1992 00:00 @68.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12/1/2011 00:00 - 01:15 1.25 CASING P PROD2 DISPLACE WELL TO KCL WATER PUMP AT 3.6 BPM AND 187 PSI WELL HEAD PRESSURE. SPOT AND R/U LRS. HOLD PJSM FOR PUMPING DIESEL. 01:15 - 02:15 1.00 CASING P PROD2 PRESSURE TESTE LRS LINES. PUMP 45 BBS OF DIESEL INTO COIL. RIG RESUMES PUMPIG AND PUMPS DIESEL INTO WELL. 02:15 - 02:45 0.50 CASING P PROD2 PJSM FOR INSTALL BPV. MONITOR WELL.VAC. INSTALL BPV WITH CAMERON ON DRY ROD. 02:45 - 03:30 0.75 CASING P PROD2 CLEAR COIL AND BLOW DOWN. 03:30 - 06:00 2.50 CASING P PROD2 CUT 100'COIL FOR COIL MANAGMENT. REHEAD COIL. 06:00 - 06:30 0.50 CASING P PROD2 CREW CHANGE. DISCUSS CURRENT OPERATION AND RIG STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO REHEAD E-COIL. 06:30 - 08:00 1.50 CASING P PROD2 CONTINUE TO RE-HEAD E-COIL. CONTINUE TO PREP FOR MOVE. CLEAN CUTTINGS BOZ WITH SUPERSUCKER. LOAD EQUIPMENT TRAILERS. 08:00 - 14:00 6.00 DEMOB P POST ND BOPS. NU TREE CAP. TEST CAP TO 3500 PSI. CLEAN OUT CUTTINGS BOX. CONTINUE TO LOAD OUT EQUIPMENT. UPDATE SELECTED SLB SOFTWARE IN OPS CAB. 14:00 - 17:00 3.00 DEMOB N RREP POST ACTIVATE RIG MOVE SYSTEM. DISCOVER HYDRAULIC LEAK IN TO JACKING RAM DRIP PAN. RU TIOGA HEATERS TO HEAT SAME. 17:00 - 22:00 5.00 DEMOB N RREP POST CONTINUE TO INPSECT JACKING RAM. CLEAN AND DRY RAM WORK RAM AND MAKE SURE NO LEAKS ARE DETECTED. RAM DEEMED TO BE SERVICABLE. 22:00 - 00:00 2.00 DEMOB P POST MOB RIG OFF OF WELL NOTIFY PAD OPERATOR OF MOB RIG OFF WELL. JACK RIG UP AND MOVE OFF WELL SPOTTING RIG ON PAD. RIG RELEASED AT 23:59 HRS ON 12-1-11 Printed 12/27/2011 12:39:31 PM BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 06 06-12 - Slot 12 06-12B Survey: MWD Survey Report - Geographic 08 December, 2011 EMI 0 bp BAKER HUGHES Survey Report-Geographic INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-12-Slot 12 Project: Prudhoe Bay TVD Reference: 19:12 7/7/1992 00:00 @ 68.00ft(generic drilling Site: PB DS 06 MD Reference: 19:12 7/7/1992 00:00 @ 68.00ft(generic drilling Well: 06-12 North Reference: True Wellbore: 06-12B Survey Calculation Method: Minimum Curvature Design: 06-12B Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 06,TR-10-14 Site Position: Northing: 5,941,880.59ft Latitude: 70°14'46.529 N From: Map Easting: 684,674.8811 Longitude: 148°30'29.224 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.40 ° Well 06-12 API No 500292045600 Well Position +N/-S 0.00 ft Northing: 5,940,585.42 ft Latitude: 70°14'33.638 N +E/-W 0.00 ft Easting: 685,317.83 ft Longitude: 148°30'11.460 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00 ft Wellbore 06-12B API No 500292045602 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (0) (nT) BGGM2011 11/25/2011 21.34 80.99 57,664 Design 06-12B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,845.87 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 31.00 0.00 0.00 214.27 Survey Program Date: 12/8/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 10,800.10 06-12A GYD-CT-CMS Gyrodata(06-12A) GYD-CT-CMS Gyrodata cont.casing m/s 10,800.10 10,845.87 06-12A MWD Sperry(06-12A) MWD MWD-Standard 10,861.00 12,975.00 MWD(06-12B) MWD MWD-Standard 12/8/2011 10:31:27AM Page 2 COMPASS 2003.16 Build 73 I0 rdii b BAKER HUGHES Survey Report-Geographic INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-12-Slot 12 Project: Prudhoe Bay TVD Reference: 19:12 7/7/1992 00:00 @ 68.00ft(generic drilling Site: PB DS 06 MD Reference: 19:12 7/7/1992 00:00 @ 68.00ft(generic drilling Well: 06-12 North Reference: True Wellbore: 06-12B Survey Calculation Method: Minimum Curvature Design: 06-12B Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,845.87 38.60 208.65 8,764.18 -4,203.13 -2,237.90 5,936,328.80 683,184.07 70°13'52.297 N 148°31'16.483 W TIP 10,861.00 38.36 208.20 8,776.02 -4,211.41 -2,242.38 5,936,320.41 683,179.80 70°13'52.216 N 148°31'16.613 W KOP 10,885.49 41.13 208.50 8,794.85 -4,225.18 -2,249.82 5,936,306.46 683,172.70 70°13'52.080 N 148°31'16.829 W 10,900.85 47.43 208.75 8,805.84 -4,234.59 -2,254.95 5,936,296.93 683,167.80 70°13'51.988 N 148°31'16.978 W 10,930.55 60.01 209.00 8,823.38 -4,255.51 -2,266.49 5,936,275.73 683,156.77 70°13'51.782 N 148°31'17.313 W 10,960.83 71.92 209.31 8,835.69 -4,279.62 -2,279.95 5,936,251.30 683,143.92 70°13'51.545 N 148°31'17.704 W 10,990.39 84.04 207.03 8,841.84 -4,305.06 -2,293.56 5,936,225.53 683,130.94 70°13'51.294 N 148°31'18.099 W 11,020.11 89.23 207.31 8,843.58 -4,331.45 -2,307.10 5,936,198.82 683,118.05 70°13'51.035 N 148°31'18.493 W 11,050.15 93.38 207.50 8,842.90 -4,358.11 -2,320.92 5,936,171.84 683,104.89 70°13'50.773 N 148°31'18.894 W 11,080.07 97.51 207.80 8,840.06 -4,384.48 -2,334.74 5,936,145.13 683,091.72 70°13'50.513 N 148°31'19.295 W 11,110.08 101.80 207.36 8,835.03 -4,410.70 -2,348.43 5,936,118.59 683,078.68 70°13'50.255 N 148°31'19.693 W 11,140.06 102.96 210.77 8,828.60 -4,436.29 -2,362.66 5,936,092.65 683,065.09 70°13'50.004 N 148°31'20.106 W 11,170.12 103.81 215.45 8,821.63 -4,460.78 -2,378.62 5,936,067.78 683,049.73 70°13'49.763 N 148°31'20.570 W 11,200.13 102.17 218.63 8,814.89 -4,484.12 -2,396.24 5,936,044.02 683,032.70 70°13'49.533 N 148°31'21.081 W 11,231.21 102.12 221.46 8,808.35 -4,507.37 -2,415.78 5,936,020.29 683,013.73 70°13'49.304 N 148°31'21.649 W 11,260.83 101.62 225.91 8,802.25 -4,528.33 -2,435.80 5,935,998.85 682,994.24 70°13'49.098 N 148°31'22.230 W 11,290.14 101.43 229.28 8,796.39 -4,547.69 -2,457.00 5,935,978.97 682,973.52 70°13'48.908 N 148°31'22.846 W 11,320.12 99.81 232.56 8,790.87 -4,566.26 -2,479.87 5,935,959.85 682,951.11 70°13'48.725 N 148°31'23.510 W 11,350.22 98.41 235.39 8,786.10 -4,583.74 -2,503.91 5,935,941.79 682,927.52 70°13'48.553 N 148°31'24.208 W 11,380.50 95.23 235.88 8,782.51 -4,600.71 -2,528.72 5,935,924.21 682,903.13 70°13'48.386 N 148°31'24.929 W 11,410.41 91.20 236.05 8,780.83 -4,617.42 -2,553.47 5,935,906.90 682,878.80 70°13'48.222 N 148°31'25.648 W 11,440.47 93.07 235.83 8,779.71 -4,634.24 -2,578.35 5,935,889.47 682,854.34 70°13'48.056 N 148°31'26.371 W 11,460.59 95.38 235.44 8,778.23 -4,645.57 -2,594.91 5,935,877.74 682,838.06 70°13'47.945 N 148°31'26.852 W 11,480.72 97.36 234.97 8,775.99 -4,656.98 -2,611.34 5,935,865.93 682,821.92 70°13'47.832 N 148°31'27.329 W 11,510.58 93.74 236.60 8,773.11 -4,673.69 -2,635.91 5,935,848.62 682,797.77 70°13'47.668 N 148°31'28.043 W 11,535.00 90.95 237.93 8,772.11 -4,686.88 -2,656.43 5,935,834.93 682,777.58 70°13'47.538 N 148°31'28.639 W 2 7/8" 11,540.62 90.31 238.23 8,772.04 -4,689.85 -2,661.20 5,935,831.84 682,772.89 70°13'47.509 N 148°31'28.777 W 11,571.56 86.41 235.59 8,772.93 -4,706.73 -2,687.11 5,935,814.33 682,747.41 70°13'47.343 N 148°31'29.530 W' 11,600.69 85.80 234.35 8,774.91 -4,723.42 -2,710.91 5,935,797.07 682,724.03 70°13'47.179 N 148°31'30.221 W 11,630.69 89.26 236.00 8,776.20 -4,740.53 -2,735.51 5,935,779.36 682,699.86 70°13'47.010 N 148°31'30.936 W 11,660.77 89.85 240.72 8,776.44 -4,756.30 -2,761.11 5,935,762.96 682,674.65 70°13'46.855 N 148°31'31.679 W 11,691.03 88.99 244.95 8,776.74 -4,770.11 -2,788.02 5,935,748.50 682,648.09 70°13'46.719 N 148°31'32.461 W 11,721.42 88.65 250.05 8,777.37 -4,781.74 -2,816.08 5,935,736.19 682,620.32 70°13'46.605 N 148°31'33.276 W 11,751.20 89.08 254.02 8,777.96 -4,790.92 -2,844.40 5,935,726.31 682,592.24 70°13'46.514 N 148°31'34.099 W 11,785.42 87.55 259.84 8,778.97 -4,798.65 -2,877.70 5,935,717.76 682,559.14 70°13'46.438 N 148°31'35.066 W 11,813.59 87.02 264.32 8,780.30 -4,802.53 -2,905.57 5,935,713.20 682,531.38 70°13'46.400 N 148°31'35.876 W 11,845.51 87.49 261.88 8,781.83 -4,806.36 -2,937.22 5,935,708.60 682,499.84 70°13'46.362 N 148°31'36.795 W 11,878.37 89.85 257.87 8,782.59 -4,812.13 -2,969.55 5,935,702.03 682,467.66 70°13'46.305 N 148°31'37.735 W 11,903.03 91.13 254.87 8,782.38 -4,817.94 -2,993.51 5,935,695.63 682,443.85 70°13'46.248 N 148°31'38.431 W 11,930.70 92.21 250.67 8,781.57 -4,826.13 -3,019.92 5,935,686.80 682,417.65 70°13'46.167 N 148°31'39.198 W 11,960.64 92.21 246.05 8,780.42 -4,837.16 -3,047.72 5,935,675.09 682,390.13 70°13'46.059 N 148°31'40.005 W 11,990.88 92.12 240.82 8,779.28 -4,850.67 -3,074.74 5,935,660.92 682,363.46 70°13'45.926 N 148°31'40.790 W 12,020.83 92.39 236.54 8,778.10 -4,866.22 -3,100.30 5,935,644.74 682,338.29 70°13'45.773 N 148°31'41.533 W 12,050.69 91.63 232.67 8,777.05 -4,883.51 -3,124.62 5,935,626.87 682,314.40 70°13'45.603 N 148°31'42.239 W 12,080.81 91.41 237.66 8,776.25 -4,900.70 -3,149.33 5,935,609.08 682,290.13 70°13'45.433 N 148°31'42.957 W 12,110.99 90.25 242.23 8,775.81 -4,915.81 -3,175.44 5,935,593.33 682,264.39 70°13'45.285 N 148°31'43.715 W 12,140.98 89.85 247.07 8,775.79 -4,928.64 -3,202.53 5,935,579.83 682,237.63 70°13'45.158 N 148°31'44.502 W 12,170.84 89.36 251.64 8,775.99 -4,939.17 -3,230.47 5,935,568.63 682,209.96 70°13'45.055 N 148°31'45.314 W 12,200.82 89.36 256.48 8,776.33 -4,947.40 -3,259.28 5,935,559.69 682,181.36 70°13'44.974 N 148°31'46.151 W 12,231.29 88.47 260.15 8,776.90 -4,953.57 -3,289.11 5,935,552.79 682,151.69 70°13'44.913 N 148°31'47.017 W 12,258.51 88.01 264.52 8,777.74 -4,957.20 -3,316.07 5,935,548.50 682,124.83 70°13'44.877 N 148°31'47.800 W 12,291.20 88.71 268.88 8,778.68 -4,959.08 -3,348.68 5,935,545.82 682,092.28 70°13'44.858 N 148°31'48.748 W 12/8/2011 10:31:27AM Page 3 COMPASS 2003.16 Build 73 di VER bp BAKER HUGHES Survey Report-Geographic INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-12-Slot 12 Project: Prudhoe Bay TVD Reference: 19:12 7/7/1992 00:00 @ 68.00ft(generic drilling Site: PB DS 06 MD Reference: 19:12 7/7/1992 00:00 @ 68.00ft(generic drilling Well: 06-12 North Reference: True Wellbore: 06-12B Survey Calculation Method: Minimum Curvature Design: 06-12B Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +EI-W Northing Easting (ft) (°) (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 12,321.40 87.36 273.23 8,779.71 -4,958.52 -3,378.85 5,935,545.63 682,062.10 70°13'44.864 N 148°31'49.624 W 12,350.63 88.34 277.58 8,780.81 -4,955.77 -3,407.92 5,935,547.67 682,032.97 70°13'44.891 N 148°31'50.469 W 12,380.81 92.92 278.77 8,780.48 -4,951.48 -3,437.79 5,935,551.22 682,003.02 70°13'44.933 N 148°31'51.337 W 12,411.48 94.30 284.00 8,778.55 -4,945.44 -3,467.78 5,935,556.52 681,972.88 70°13'44.992 N 148°31'52.208 W 12,440.90 94.30 288.38 8,776.34 -4,937.26 -3,495.95 5,935,564.00 681,944.53 70°13'45.072 N 148°31'53.027 W 12,470.78 93.07 286.10 8,774.42 -4,928.43 -3,524.43 5,935,572.14 681,915.84 70°13'45.159 N 148°31'53.854 W 12,500.67 91.53 282.12 8,773.22 -4,921.15 -3,553.38 5,935,578.70 681,886.72 70°13'45.230 N 148°31'54.696 W 12,535.17 89.72 278.69 8,772.84 -4,914.92 -3,587.31 5,935,584.09 681,852.65 70°13'45.292 N 148°31'55.681 W 12,561.11 89.88 274.62 8,772.93 -4,911.91 -3,613.07 5,935,586.46 681,826.83 70°13'45.321 N 148°31'56.430 W 12,590.88 89.60 270.89 8,773.07 -4,910.48 -3,642.80 5,935,587.16 681,797.07 70°13'45.335 N 148°31'57.293 W 12,620.80 89.91 266.18 8,773.20 -4,911.25 -3,672.70 5,935,585.66 681,767.20 70°13'45.327 N 148°31'58.162 W 12,650.98 90.15 262.11 8,773.18 -4,914.33 -3,702.72 5,935,581.85 681,737.27 70°13'45.297 N 148°31'59.034 W 12,680.96 89.91 257.70 8,773.16 -4,919.58 -3,732.22 5,935,575.87 681,707.90 70°13'45.245 N 148°31'59.891 W 12,711.15 90.31 253.37 8,773.11 -4,927.12 -3,761.45 5,935,567.62 681,678.87 70°13'45.171 N 148°32'0.740 W 12,739.23 90.12 249.40 8,773.00 -4,936.08 -3,788.06 5,935,558.00 681,652.50 70°13'45.082 N 148°32'1.513 W 12,774.37 88.99 244.62 8,773.27 -4,949.80 -3,820.39 5,935,543.49 681,620.51 70°13'44.947 N 148°32'2.452 W 12,804.46 89.23 240.28 8,773.74 -4,963.71 -3,847.06 5,935,528.93 681,594.19 70°13'44.810 N 148°32'3.227 W 12,834.32 89.51 243.06 8,774.07 -4,977.88 -3,873.34 5,935,514.12 681,568.27 70°13'44.671 N 148°32'3.990 W 12,864.38 89.26 247.25 8,774.39 -4,990.51 -3,900.61 5,935,500.83 681,541.32 70°13'44.547 N 148°32'4.782 W 12,894.21 89.32 251.40 8,774.76 -5,001.04 -3,928.51 5,935,489.62 681,513.69 70°13'44.443 N 148°32'5.593 W 12,924.17 89.79 255.33 8,775.00 -5,009.61 -3,957.21 5,935,480.34 681,485.21 70°13'44.358 N 148°32'6.427 W 12,975.00 89.79 255.33 8,775.18 -5,022.48 -4,006.38 5,935,466.27 681,436.37 70°13'44.232 N 148°32'7.855 W TD-2 3/8" 12/8/2011 10:31:27AM Page 4 COMPASS 2003.16 Build 73 TREE= 4-1/16"CM/ I WELLHEAD= FMC 06-12B SAFETY i ES: WELL ANGLE<70°@ 10956' *** I ACTUATOR= BAKER C4-1/2"CHrcOME TBG&7"CHROME LNR(10320'- 1 ORIG. KB.ELEV= 68' 11365')*** ORIG. BF.ELEV= ? I KOP= 3861' 20"CONDUCTOR —I —110 I) Max Angle=104°@ 11170' Datum MD= WA 94#,H 40, Datum TV D= 8800'SS ID=19.124" .. .....2.5....._-1 2192' —14-1/2"CAM BAL-O SV LN SSSV NIP,ID=3.813" 9-5/8"CSG,47#,L-80, ID=8.681" —I 2040' j 0 GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2995 2995 1 TE-TGPD DOME RK 16 12/15/11 13-3/8"CSG,72#,N-80 BTC,ID=12.347" —I 2708' I--AI mi, 2 4757 4719 21 TE-TGPD SO RK 20 12/15/11 Minimum ID = 1.90" @ 11461' C3 6991 6226 56 TE-TGPD DMY RK 0 10/11/11 4 8580 7126 49 TE-TGPD DMY RK 0 10/11/11 5 9173 7529 45 TE-TGPD DMY RK 0 07/30/03 1 2.70" DEPLOY SLEEVE 6 9376 7676 42 TE-TGPD DMY RK 0 03/12/08 9440' 9-5/8"X 7"TIEBK SLV w/ISOLATION LTP TOP OF 7"LNR —I 9440' Z T 1&HYFLO II LNR HGR, ID=6.313" • 9-5/8"CSG,47#, L-80 BTC, ID=8.681" —I —9753 SIDETRACK WINDOW(06-12A)9696' 9753' 7"LNR,26#,L-80,NSCC XO TO 13CR-80 FOX —I 10320' 1----XX I ' 10522' —I4-1/2"OTIS X NIP,ID=3.813" S X 10587' —17"X 4-1/2"OTIS MHR PKR, ID=3.875" 10613' H4-1/2"OTIS X NIP,ID=3.813" 10603' ELM —13.7"DEPLOY SLV, ID=3.00" 'PI - 10632' 14-1/2"PARKER SWN NIP,MILLED TO 3.80"(10/25/11) 10613' ELM —13-1/2"X 3-3/16"LNR XO,ID=2.786" 4-1/2"TBG, 12.6#,13CR-80 FOX, H 10645' I----/ ` 1 10645' —4-1/2"WLEG, ID=3.958" I .0152 bpf, ID=3.958" 10623' —I ELMD TT LOGGED 12/04/92 SIDETRACK WINDOW(06-12B) 10868'- 10876' TOP OF CEMENT(11/02/11) — 10840' I 3.625"WHIPSTOCK(11/02/11) — 10860' •• •••• , • 7"LNR,26#, 13CR-80 FOX, — —10876 •• / o.•, / 06-12BL1 0383 bpf, ID=6.276" •4., ...i kiiir,„,• // /— , ••••••�••• / // 2-3/8"LNR, H 13693' • PERFORATION SUMMARY •�v•••f•t• .•�/ // 4.43#,L-80 STL, ••• REF LOG: BKR INTEG GR/RES ON 11/30/11 •••• : ,,••••••. // .0039 bpf, ID=1.992" ANGLE AT TOP PERF:N/A g Note:Refer to Production DB for historical perf data •�•�•�•�•�•�� . ...... SIZE SPF INTERVAL Opn/Sqz DATE 2-3/8"DEPLOY SLV, ID=1.90" 11461' .. .. 06-12B ... �.-. 2-3/8" SLTD 11608- 12089 SLOT 11/23/11 3-3/16"LNR,6.2#, L-80 TC-11, —I 11533' qv 2-3/8" SLTD 12091 - 12786 SLOT 11/23/11 .0076 bpf, ID=2.80" . 06-128 06-12BL1 2.25"BKR OPEN HOLE BILLET, ID=1.00" 11587' 2-3/8" SLTD 11462- 13672 SLOT 11/30/11 2-3/8" LNR,4.43#,L-80 STL, — 12787' .0039 bpf, ID=1.992" ( t DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/14/80 PRK 141 ORIGINAL COMPLETION 12/18/11 MSS/PJC GLV C/O(12/15/11) WELL: 06-12B j 07/29/92 N2ES SIDETRACK(06-12A) PERMIT No: 2111150,2111170 12/01/11 NORDIC 2 CTD SDTRACK M L(06-12B) API No: 50-029-20456-02, (60) 12/07/11 DGD/PJC FINAL DRLG CORRECTIONS SEC 2,T1 ON, R14E, 1679'FEL&2'FSL 12/09/11 MP/PJC DRAWING CORRECTIONS 12/16/11 MSS/PJC PULL MODX LOCK(12/16/11) BP Exploration(Alaska) oF A [Las [rvm J SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 06-12B BP Exploration (Alaska), Inc. Permit No: 211-115 Surface Location: 2' FNL, 1679' FEL, SEC. 02, T1ON, R 14E, UM Bottomhole Location: 4931' FNL, 1322' FEL, SEC. 10, T1ON, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincer- L ry" . . No - .n Co I mi :'oner DATED this -day of September, 2011. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RECEIVED ALA;' OIL AND GAS CONSERVATION COMM 'ON PERMIT TO DRILL SEP 01 2011 20 AAC 25.005 94-x/ 1 a.Type of work: lb.Proposed Well Class: ®Development Oil 0 Service-Willi 0 Single Zone asekbilitiftGassrregos&ummission o Drill ®Redrill 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed( C.gHydrates ❑ Re-Entry 0 Exploratory 0 Service-WAG 0 Service-Disp a Gas 2. Operator Name: 5.Bond: ® Blanket 0 Single Well 11. Well Name and Number: BP Exploration(Alaska)Inc. Bond No. 6194193 PBU 06-12B 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 13883' TVD 8730'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028311 &028312 2'FNL, 1679'FEL, SEC.02,T1ON, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 4196'FNL,3918'FEL,SEC. 11,T1ON, R14E, UM October 20,2011 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 4931'FNL, 1322'FEL,SEC. 10,T1ON, R14E, UM 2560 16,400' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 68' feet 15.Distance to Nearest Well Open Surface: x- 685318 y-5940584 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 570' 16.Deviated Wells: Kickoff Depth: 10880' feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 102 degrees Downhole: 3487 Surface: 2616 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length, MD TVD MD TVD (including stage data) 4-1/4" 3-3/16" 6.2# L-80 TC-II 880' 10620',8526'ss 11500' 8716'ss 41 sx Class'G' 3" 2-3/8" 4.7# L-80 STL 2383' 11500'_8716'ss 13883' 8730'ss Uncemented Slotted Liner 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured): 11400' 921Q' None 11315' 9141' —11382' Casing Length Size Cement Volume MD TVD Conductor/Structural 73' 20" 281 sx Arcticset II 73' 73' Surface 2708' 13-3/8" 2000 sx Fondu.400 sx Arcticset II 2708' 2708' Intermediate 9696' 9-5/8" 500 sx Class'G'.300 sx Arcticset I 9696' 7920' Production Liner 1925' 7" 551 cu ft Class'G' 9440'-11365' 7724'-9182' Perforation Depth MD(ft): 10841'-11110' Perforation Depth TVD(ft): 8760'-8975' 20.Attachments: 0 Property Plat ® BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ®Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Eli Vazquez,564-5918 Printed Name J t,;v,,a("y,,: Title Engineering Team Leader Prepared By Name/Number. Signatu �'` �� Phone 564-4711 Date r / t Teme Hubble,564-4628 r Commission Use Only Permit To Drill API Number: Permit Approval gate: See cover letter for Number: a„vmS 50-029-20456-02-00 C`\a``\ other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: i Other: 350 �st �� 7";;f" Samples Req'd: Yes 6o Mud Log Req'd: ❑yes 'No --2580 far:. Anna f<Sf C'".-.-1 H25 Measures: El Yes 0 • Directional Survey Req'd: lir Yes 0 No (Of// 9�/Z (� APPROVED BY THE COMMISSION Date ,COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 months from the .47 of ap royal(20 AAC 25.. 5(g)) Submit In Duplicate ',11. 7.111( ORIGINAL ,; / To: Alaska Oil &Gas Conservation Commission From: Eli Vazquez CTD Engineer 0 bp Date: August 29th, 2011 Re: 06-12B &06-12B L1 PTD Request Approval is requested for a permit to drill a CTD sidetrack from well 06-12k Well 06-12A was a sidetrack drilled in July 1992. The purpose was to fix integrity problems with the well and provide a profile modification. The well was completed with 4-1/2" chrome tubing and a 7" chrome liner and initially only had pens in Zone 4. The perforations were squeezed and re-perfed in preparation for a Zn 4 frac job which increase oil production in 1993. Later in 1994, the sag was frac'd which increase oil production that steadily dropped to low rates as water cut climbed. The well is in sound mechanical condition. It passed an MIT-IA to 3000 psi and MIT-OA to 2000 psi (April 2011). The March 2010 Caliper shows the 4W tubing to be in good condition, some scale like deposits at -10,030' and to 10,410' and restricting the ID to 3.61" at 10,154' md. With respect to the 7" liner, it appears to be in good/fair condition with max wall penetration of 25% at 10,745' md. This well has been cycled several times with no real recovery converting this well into a low value Ivishak producer. The proposed CTD Sidetrack is a horizontal dual lateral Sag River producer which will provide offtake in a fault block located in Southern Drill Site 6. The multilateral sidetrack, 06-12B & BL1, is scheduled to be drilled by Nordic 2 starting on October 20th, 2011 targeting the Saq River formation. The pre rig includes setting a thru-tubing whipstock, milling XN Nipple, and squeezing perforations. With the whipstock set and perforations abandoned, Nordic 2 will mill a window off of the mechanical whipstock allowing a kick off in the Shublik formation. This sidetrack will make a 41 DLS build to land in the Sag River formation. Then a 3-3/16" protection string will be run (and cemented in place if Zn 4 Ivishaks encountered) to cover the Shublik formation. Then, the 3-3/16" shoe will be drilled out and drilling will continue via 12 DLS to the planned 06-12B TD which will be completed with a 2-3/8" slotted liner with billet on top. Finally, the 06-12B L1 will be drilled by kicking off the 06-12B slotted liner top billet and will be completed with 2-3/8" slotted liner brought back into the 3-3/16" protection string. The following describes the planned work. A schematic diagram of the proposed sidetrack is attached for reference. CTD Sidetrack Summary Pre-CT Rig Work: The pre CTD work is planned to begin September 15th, 2011. 1. W Check tubing hanger LDS. 2. W PPPOT-T to 5000 psi 3. S Drift for 4W x 7" thru-tubing whipstock. 4. E Set 4W x 7"thru-tubing whipstock at 10,860' md. 5. C Mill potential scale at 10,154' and and XN Nipple at 10,362' md. 6. C Abandon perforations in existing well by pumping 37 bbl of 15.8 ppg class G (attempt to down squeeze 10 bbls). a. Cement volume: i. 7" liner volume from PBTD to whipstock: 17 bbl ii. Squeeze: 10 bbl iii. Excess: 10 bbl 7. V PT tree (MV,SV,WV) • 8. D Bleed wellhead pressures down to zero. 9. D Bleed production flow lines and GL lines down to zero and blind flange. 10. 0 Remove wellhouse, level pad. Rig Sidetrack Operations: (Scheduled to begin on October 20th, 2011 using Nordic Rig 2) 190 1. MIRU Nordic Rig 2 /t 2. NU 7-1/16" CT Drilling BOPE and test 5515°P.2:- 3. 5°opZ3. Mill 3.80" single string high side window in 7" 26# 13Cr production liner from mechanical thru-tubing whipstock. 4. Drill 41 DLS build with 41/4' bi-center bit and land well in Sag River. 5. Run 3-3/16"TCII protection string leaving TOL at 10,620' and Pr- a. Ta. This protection string will be cemented in the Ivishak Zn 4 is encountered. '--2" '(w"' 6. Drill 06-128 lateral section with 3" bi-center bit in target Sag River formation to a final TD at 13,883' md. Ff.-0 7. Run triple combo open hole log. 8. Run 23/8" slotted liner with aluminium billet on top and drop at-11,500' and 9. Drill the 06-12B L1 second lateral section with 3" bi-center bit from -11,500' and to 13,470' md. 10. Run 23/8" slotted liner and drop inside 3-3/16" protection string. 11. Freeze protect well to 2200' TVD. 12. Set BPV. ND 7-1/16" BOPE stack. Freeze protect tree and PT tree cap to 3500 psi. 13. RDMO Nordic 2. Mud Program: • Well kill: 8.6 ppg seawater/brine. • Milling/drilling: 8.6 ppg Geo-VIS for milling window and drilling. • Disposal: • All Class II drilling and completion fluids and all other Class II wastes will go to Grind & Inject at DS 4. • All Class I wastes will go to Pad 3 for disposal. Hole sizes: 41/4' hole: 10,860' and- 11,500' and (06-12B Protection String Interval) ' 3" hole: 11,500' and- 13,883' and (06-128) • 3" hole: 11,500' and- 13,470' and (06-128 L1) Casing Program: Slotted Completion • 33/18", L-80 6.2 lb/ft TC-II solid liner, 06-12B Protection String 10,620' and- 11,500' and ■ If the Ivishak Zn 4 is drilled into (water wet), then this protection string will be cemented in place. o A minimum of 8.5 bbl of 15.8 ppg Class G cement will be used for protection liner cementing. (Assuming 41/4" hole size as specified above and 10% excess in open hole). o TOC planned at 10,750' md.✓ • 2-3/8", L-80 4.7 lb/ft STL slotted liner, 06-12B 11,500' and- 13,883' and • 23/8", L-80 4.7 lb/ft STL slotted liner, 06-12B L1 11,500' and- 13,470' and ■ Not cemented. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • • The annular preventer will be tested to 250 psi and 3000 psi. Directional • See attached directional plan. Maximum planned hole angle for 06-12B is 102° at 11,130' and and 90° at 12,215' and for 06-21B L1. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property- 16,160' for 06-12B, 15,770'for 06-12B L1 • Distance to nearest well within pool-570'from 06-12B to 14-26 and 254' from 06-12B L1 to 06-17. • Anti-Collision • 06-12B o 13-24A 220' (ctr—ctr distance) Status: Water injector injecting. This well will be shut it prior to commencing drilling operations on well 06-12B. Close approach occurs in perforated section of 2-7/8" solid and cemented liner in located in the Ivishak Formation. • 06-12B L1 o 13-24A 527' (ctr—ctr distance) Status: Water injector injecting. This well will be shut it prior to commencing drilling operations on well 06-12B. Close approach occurs in non-perforated section of 2- 7/8" solid and cemented liner in located in the Ivishak Formation. Logging • MWD directional, Gamma Ray and Resistivity logs will be run over all of the open hole section while drilling. • Open hole triple combo log: Gamma Ray, Resistivity, Density, Neutron, Caliper, Microresistivity, Hazards • Most recent H2S level on 06-12A is 60 ppm recorded on February 16, 2011. • The maximum recorded H2S level on DS 06 is 300 ppm on well 06-14 (May 12th, 2011). • One possible fault crossing is expected at 12,616' and for well 06-12B. • The lost circulation risk in the 06-12B and 06-12B L1 is considered to be medium to high due to the history of losses in area. Reservoir Pressure • The reservoir pressure is estimated to be: o 06-12B: 3,487 psi at 8,710 TVDss (7.7 ppg equivalent) based on offset pressures. o 06-12B L1: 3,487 psi at 8,710 TVDss(7.7 ppg equivalent) based on offset pressures. • Max expected surface pressure with gas (0.10 psi/ft)to surface is: o 06-12B: 2,616 psi. o 06-12B L1: 2,616 psi. Eli Vazquez Coiled Tubing Drilling Engineer CC: Well File Sondra Stewman/Elizabeth Barker TREE= CAM FLS . NOTES: ***CHROME 4-1/2"TBG AND 7" ACTUATOR= BAKER C 06-1 2 A LNR*** KB.ELEV= 68' BF.ELEV= ? KOP= 3861' Max Angle= 59 @ 8300' Datum MD= 10977' Datum TVD= 8800'SS 9-5/8"CSG,47#, L-80, ID=8.681" — 2040' TOP OF 9-5/8"CSG — 2040' O 2192' —14-1/2"CAM BAL-O SVLN SSSV NIP, ID=3.813" GAS LIFT MANDRELS 13-3/8"CSG,72#,N-80, ID=12.347" — 270$' ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2995 2995 1 TE-TGPD DOME RK 16 05/03/11 2 4757 4719 21 TE-TGPD DOME RK 16 05/03/11 TOP OF 7"LNR —i 9440' ® 3 6991 6226 56 TE-TGPD DOME RK 16 05/03/11 4 8580 7126 49 TE-TGPD SO RK 22 05/03/11 5 9173 7529 45 TE-TGPD DMY RK 0 07/30/03 6 9376 7676 42 TE-TGPD DMY RK 0 03/12/08 TOP OF CEMENT —1 9384' C pi • IA SIDETRACK WINDOW 9696'-9753' 7"LNR,26#,L-80, .0383 bpf, ID=6.276" — 10358' j • 14 14 TOP OF 7"LNR — 10358' 4: 't 94 10522' —14-1/2"OTIS PROFILE NIP, ID=3.813" Minimum ID = 3.725" @ 10632' 1'0 04 111 10587' —17"X 4-1/2"OTIS MHR PKR,ID=3.875" 4-1/2" PARKER SWN PRO. NIPPLE �141 4144����\v'' 10613' 4-1/2"OTIS PROFILE NIP,ID=3.813" 41144 PERFORATION SUMMARY ,1'4'.'4'4, 10632' 4-1/2"PARKER SWN PROFILE NIP, ID=3.725" REF LOG: BHCS ON 07/18/92 .0044.141%14 ANGLE AT TOP PERF:39°@ 10841' 144�4�4�411\ Note:Refer to Production DB for historical perf data 4�4���1�1�04 44444414 SIZE SPF INTERVAL Opn/Sqz DATE 00..0\ 3-3/8" 4 10841 - 10861 0 06/24/93 004104 � 4��������4��014 4444411 1 44 10645' —14-1/2"TBG TAIL,ID=3.958" 2-1/8" 4 10966-10970 0 04/14/96 2-1/8" 4 10978-10982 0 04/14/96 �4�4������������0 2-1/8" 6 10992- 11010 0 04/14/96 ������'�.�����0� 41 10623' H ELMD TT LOGGED 12/04/92 144444.44.1 2-1/8" 6 11023- 11046 0 04/11/96 444.44444* .411.40.41 3-3/8" 6 11051 - 11071 0 03/18/96 0004 041 01000• 3-3/8" 4 11076- 11095 S 10/18/93 .�.�.�.�.�.�.�.�.�..1 11/4 2-1/2" 8 11090- 11110 0 12/02/93 4'4'4'4♦4'.'4♦4'.♦4♦1 ' � 4�.. 0� 44144 3-3/8" 4 11118- 11130 S 10/18/93 *0.4.0414 4444 3-3/8" 4 11140- 11158 S 10/18/93 40444.44.1 ` 11382' —5'X3'BAILER TUBE W/2.3" FN(LOST 03/24/96) 11387' F HES-N15-R-P-RK 4-1/2"TBG, 12.6#, 13-CR-80, .0152 bpf,ID=3.958" —1 10645' (LOST BEFORE 02/12/94) .0. 11392' —PETREDAT GAUGE PBTD --I 11315' , ,;,,��� (LOST 06/18/93) 7"LNR,26#,13-CR,.0383 bpf, ID=6.276" -j 11365' �� DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT r 05/80 ORIGINAL COMPLETION 05/01/11 CDJ/PJC GLV C/O(04/28/11) WELL: 06-12A 07/30/92 SIDETRACKED 05/05/11 MSS/PJC GLV C/O(050/03./11) PERMIT No: 1920640 09/16/01 RN/TLP CORRECTIONS API No: 50-029-20456-01 03/18/10 ?/SV TREE C/O(03/04/10) SEC 11,T10N,R14E,4099.13'FEL&4504.76'FNL 11/15/10 SRD/PJC SET IBP(10/31/10) 12/08/10 JLJ/PJC PULL IBP(11/27/10) BP Exploration(Alaska) TREE= CAM FLS WELLHEAD= FMC SAI ACTUATOR= BAKER C 06-12B5 B L 1 LNR*** NOTES: ***CHROME 4-1/2"TBG AND 7" KB.ELEV= 68' Proposed Pre CTD Work BF.ELEV= ? KOP= 3861' Max Angle= 59 @ 8300' Datum MD= 10977' Datum TVD= 8800'SS 9-5/8"CSG,47#,L-80, ID=8.681" —1 2040' TOP OF 9-5/8"CSG —1 2040' ` O , _ 2192' —14-1/2"CAM BAL-O SVLN SSSV NIP, ID=3.813" GAS LIFT MANDRELS 13-3/8"CSG,72#,N-80, ID=12.347" — 2708' ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2995 2995 1 TE-TGPD DOME RK 16 05/03/11 I I — 2 4757 4719 21 TE-TGPD DOME RK 16 05/03/11 TOP OF 7"LNR H 9440' 1---- L 3 6991 6226 56 TE TGPD DOME RK 16 05/03/11 4 8580 7126 49 TE-TGPD SO RK 22 05/03/11 5 9173 7529 45 TE-TGPD DMY RK 0 07/30/03 TOP OF CEMENT —I 9384' 6 9376 7676 42 TE-TGPD DMY RK 0 03/12/08 SIDETRACK WINDOW 9696'-9753' I I 7"LNR,26#, L-80, .0383 bpf, ID=6.276" H 10358' • I I ■ 10522' —4-1/2"OTIS PROFILE NIP, ID=3.813" Minimum ID= 3.8" @ 10,632' MD Milled Out XN Nipple X a- 10587' —7"X 4-1/2"OTIS MHR PKR,ID=3.875" 10613' —14-1/2"OTIS PROFILE NIP, ID=3.813" I I 10632' —4-1/2"SWN PROFILE NIP Milled Out to 3.80" 4-1/2"TBG, 12.6#,13-CR-80, .0152 bpf, ID=3.958" H 10645' — / • 10645' —14-1/2"TBG TAIL, ID=3.958" PERFORATION SUMMARY REF LOG: BHCS ON 07/18/92 10623' —I ELMD TT LOGGED 12/04/92 ANGLE AT TOP PERF:39"@ 10841' Note:Refer to Production DB for historical perf data j� SIZE SPF INTERVAL Opn/Sqz DATE 40o II 10860' TOC • 3-3/8" 4 10841 - 10861 S 2011 UU 2-1/8" 4 10966 10970 S 2011 10860' H4.5"x 7"whipstock 2-1/8" 4 10978- 10982 S 2011 2-1/8" 6 10992- 11010 S 2011 2-1/8" 6 11023-11046 S 2011 3-3/8" 6 11051 -11071 S 2011 I 3-3/8" 4 11076- 11095 S 10/18/93 2-1/2" 8 11090- 11110 2011 3-3/8" 4 11118- 11130 S 10/18/93 3-3/8" 4 11140- 11158 S 10/18/93 PBTD —{ 11315' 1�•1*1*I���•• 7"LNR,26#, 13-CR, .0383 bpf, ID=6.276" H 11365' 1...1014 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT r 05/80 ORIGINAL COMPLETION 05/01/11 CDJ/PJC GLV C/O(04/28/11) WELL: 06-12B&BL1 PRE RIG 07/30/92 SIDETRACKED 05/05/11 MSS/PJC GLV C/O(050/03./11) PERMIT No: 1920640 09/16/01 RN/TLP CORRECTIONS 06/28/11 EV CTD PLAN PRE RIG API No: 50-029-20456-01 03/18/10 ?/SV TREE C/O(03/04/10) SEC 11,T10N,R14E,4099.13'FEL&4504.76'FNL 11/15/10 SRD/PJC SET IBP(10/31/10) 12/08/10 JLJ/PJC PULL IBP(11/27/10) BP Exploration (Alaska) TREE= CAMELS WELLHEAD= FMC , B L 1 LNR*** NOTES: ***CHROME 4-1/2"TBG AND 7" ACTUATOR= BAKER C 06-12B KB.ELEV= 68' Pr000sed CTD Sidetrack BF.ELEV= ? KOP= 3861' Max Angle= 59 @ 8300' Datum MD= 10977' Datum TVD= 8800'SS 9-5/8"CSG,47#,L-80, ID=8.681" — 2040' TOP OF 9-5/8"CSG 2040' ` O , 2192' —4-1/2"CAM BAL-O SV LN SSSV NIP, ID=3.813" GAS LIFT MANDRELS 13-3/8"CSG,72#,N-80, ID=12.347" —1 2708' ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2995 2995 1 TE-TGPD DOME RK 16 05/03/11 2 4757 4719 21 TE-TGPD DOME RK 16 05/03/11 TOP OF 7"LNR H 9440' I--- I, — 3 6991 6226 56 TE-TGPD DOME RK 16 05/03/11 4 8580 7126 49 TE-TGPD SO RK 22 05/03/11 5 9173 7529 45 TE-TGPD DMY RK 0 07/30/03 TOP OF CEMENT —1 9384' 6 9376 7676 42 TE-TGPD DMY RK 0 03/12/08 I I SIDETRACK WINDOW 9696'-9753' 7"LNR,26#,L-80, .0383 bpf, ID=6.276" — 10358' • e I I 10522' —14-1/2"OTIS PROFILE NIP,ID=3.813" Minimum ID= 1.995' @ 11,400' MD 2-3/8" Slotted Liner $— 10587' -17"X 4-1/2"OTIS MHR PKR,ID=3.875" 11 10613' —14-1/2"OTIS PROFILE NIP, ID=3.813" 3-3/16"L-80 TC-II TOL ID 2.30" —I 10620' 1 l J _ es„.t-04._ c_....(- f C....:,........ 430 I I 10632' H4-1/2"SWN PROFILE NIP Milled Out to 3.80" I 4-1/2"TBG, 12.6#,13-CR-80, .0152 bpf, ID=3.958" 1 10645' — 10645' —4-1/2"TBG TAIL, ID=3.958" 10623' —ELMD TT LOGGED 12/04/92 10800' -1 roc 10860' H 4 5"x 7"w hipstock I 400 2-3/8"L-80 ST-L slotted liner —1 13470' I PERFORATION SUMMARY —�`: 7BL1 REF LOG: ANGLE AT TOP PERE: .-• /" Note:Refer to Production DB for historical perf data 1 ,....... a Slotted Completion,all previous perfs abandonned pre-rig I GST TOL Al billet-11,500' SIZE SPF INTERVAL Opn/Sqz DATE efr55;,(,-. 2-3/8"L-80 ST-L slotted liner —I 13883' PBTD —1 11315' 7"LNR,26#,13-CR, .0383 bpf, ID=6.276" — 11365' 101.0.4 DATE REV BY COMMENTS DATE REV BY COMMENTS I PRUDHOE BAY UNIT 05/80 ORIGINAL COMPLETION 05/01/11 CDJ/PJC GLV C/O(04/28/11) WELL: 06-12B&BL1 07/30/92 SIDETRACKED 05/05/11 MSS/PJC GLV C/O(050/03./11) PERMIT No: Pending 09/16/01 RN/TLP CORRECTIONS EV CTD PLAN SIDETRACK API No: 50-029-20456-02,06 03/18/10 ?/SV TREE C/O(03/04/10) SEC 11,T10N,R14E,4099.13'FEL&4504.76'FNL 11/15/10 SRD/PJC SET IBP(10/31/10) 12/08/10 JLJ/PJC PULL IBP(11/27/10) BP Exploration(Alaska) Q 0 0 m I Q Q 0 J a) Qre co c a) ._ .Q L Qa NcC r om O C III W mt01 2 coN • m a ,' (-11 N U) ,�= o . C a- `�0 Z a` aoo a COco °f m W H Z N- 1)] O O O O O O O O) O O O 0 N.. CV O 0 0 0 0 0 O N. 0 0 0 0 Q o O o 00 0 0 0 0 .- 00 0 05 -o 0) co W W 0) m m m m ' ' to) to) m CO0 C C U ^ IL L- i- .. C) U U ~ 0N U U .; .. 0) 0) C C m co N.. O N W ,- N. O O m N I.-- 0) Q OI CO N- N O N- O 0) V' V' CO N CO = C M W n 6 m N M N m m O V' M n O O M M 4,-) O I,- W No O O U O O a_ W W W co o O O O N N co co V• U m m N N N N N N M M M M M M M M M M CD m 2 N C O O o 0 v CV 0 0 N O 0 0 3 a M N O O O O O O O O O O O O U) Om) Q) z Z W v O O O O O O O O O O O O 3 M N 0I r r r r r r N U Q V V CV CV CV N 'C 0 e0•- 0)) 0)) F w N- co co n CO CO 0) n M N V co O M O O M 0 M CO CO CO N V' M O N V O 7 CO m m M m m N O UI m m N. mM N CO CO M CO M m O U 'O o) ,_ • O 0 O m co m CO CO c Oc _ M M M M M M M M M CV- co N N N N 2t m m m m m m m m co CO co co co y) � CO CO co co CO CO CO CO CO (0 CO co CO CO al a) 2 W ct W C O V.N C d U W s C` c V c 3 O h m W 0 N- N CO CO CO co N co 7 N (Na) - N. V' CD N- U) n N- 9 N w R "I CO Oa; N.: V u') CO C) 6 M N- CO (` O 42a; 4) U O t N N 0 O) N N 0 CO Vo V M 0y Cr T CO O 0) M M M N N N O 0) 0) 0) CO CO C COa) .0 C CO CO CO CO CO CO co- m N In N N U] U 0 Z .10. .N- 2t x 0 co 0) co 0) co co co co co co co co co J > O 1pp F '! z N 0 c? "O 'o O CO CO CO u) N CO CO CO CO CO N CO CO CO D z c 0 C C 8 O m C0 co 120 Q - CD i a O co co N. V' CO M 0) CO m V co R N Q) V "O o o m O O 0 — m O m N- M O O N- 1"- C W N- N m M r N m N N M M y >. M V' V tO O) W I)] O) m 0) V. N M 0) 0 0 2 2 (N N N N N N M M M V' C u) m m _ _ a C 24 _ N N N N N N N N N N N N (ii N m 0 W 1- 0 O V I CO if) V' 0 CO M Csr V N CO CO N - CO O M 0) • CO CO N co N N 0) m c") M O N V N N6 CO N- N N- CO V' y U O N M O • O N m CO CO N co N N N N M M V. 7 V II') CO m ( CO NT E 1 v v c v c c v v v q q v v q a z 0 co) x c6o o z I-- O CO V• N M M CO M n CO O m (0 7. N r- O CO. LO N CO N O N N m CO Q CO N. (Si N CO N CO m O N CO N N 0) O N M r N. CO CO C N N N co n N- N N. N. N. N- N. n s- 7 (p co- m co- CO m co- CO co- m m Co m co- CO 0 o x m m O N >. 7 O m Ov CO CN I co M co co co M N CO CO CO m CO Cn . N N N N N N CO O 0) 0) m 0) , 2 CO DD CO 6 6 CCI CO CO CO O) M M M M • UO 0 0 0 0 0 0 O N M M M M F O_ N N N N N N N N N N N N N N a U m _ O 0 N Q "' a_ .- 3 >-03 n N T < < W Z N N r a- C m 7 COco COm co co co co co co 0 N. N- n N- N 0 0 d m M co N V. 0 O) M N O O N CO CO O CO CO m CO Ni V N O Q d _o W c- co co V' C co co 0) O O O O O) CO CO CD R O CO M U 0 CO C CO Co C o^ CD J E CO o r S 0 0 D 0 < o L L o N COm m o ▪ 215 Z0_ a o o d E o o N- O 0 d 0 0 0 0 0 0 O O 0 0 O o Q O) m o 0 0 o O o 0 0 0 0 0 0 0 o v ■ WI 0 COro N O 0 a) 0 O v o 0 O O O 0 O o CO O. d V CO co o 0) o o co o o V 0 0 CO CO co O 0) 0) O 0 N CO M V LO CO ^O W� T I g c x o o (n 0 - o a 0 0 o . 0 0 c - r mown c .. NL N.�. Y w w of )o N. co Sii c...7"." 0. o .. a m N C N m - C •O v N 0) y 3 . T Z 0 O. to 3 0 CI) 3. _.. CO O O O O N N- O M O � O � n O CO 07 O a) O N- N. O 0 O O W V. 0 W 0 N. 0 W u) 0 N- 4 o co O CO a CI. 0 0 0 0 of a) o a) o o) o o) ai o ai a) o ai ro u) p)p) CO W CO CO 0) CO W W 0 CO 00 W CO CO O) CO W W .- m 0 rn rn m co c c w o ei a O N U U co co c c CD 01 0 n O DI N.- M O W W u) III NV a.N c0 7 u) N V N M M N OO]V M W W O W ai N. a) W W MWO O W W N a) (0 N W (O 1� 0WO O a V V u7 N 1` W a) 0) O O MMWW N o M M M M M M M M 4 7 7 V C V co co i CI) � 0 0 0 0 -a 01 0 0 22 0 0 3 a 9 rnCV CV m 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 u) Si Z Z O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 Q N N N N N N N N N N,_ N N N N N N N N N N N N- n 0 •- •.- r .- r .--rr r r r r re-.- .- r f- n E co O (N ( D J G 13 m co H W p .... N. n O C M M W W O) co N W u) IO LO .- O M O O) co N. O CO W W W O c0 7 n n W W CO M V N u) W O) V M O) u) W W N- 0) W W CU co N O) 0 W W CO N. N. N- n CO CO N co co CO CO N ii c) N. 1` co W u) u) V V M M N ,- ,- O a) 0) CO CO c- W C 0 C _ N N N N N N N N N N N N N N .- .- .- t — co co co co W co co co co co co co W co W W W co co co w N 0 g (O (O cO W W W W W cO W W W W W W W W W W 0 ar W O d iz V 2 o C (dj y O N. N N- C N Q N CO u) M 11] co r W l)') u') O N c N .- O n N N. .1. N.. .4 W co N- M O V u') W O) 4 e .d m d W 1� N- N- 6 W W M N u) M O W v u) O W W V O ud. m 0 co N. (O N W N. N 4 N L- O N- N- M N N co co V 7 0 W te{ N d co N N- N- c.. W c0 W (O CO CO W a) u) u) ca 1f) M) cO W u) V IX p L .� L (W�) 03 't M coccoccam') (�+) (W') (�+) CI (`N7 01 el (��I 0�7 (�+) 01 0) (`N') (`W') COu (`N7 >> p 0) 0) rn rn rn rn CD CD W 0) W m CD rn rn rn m 0) CD 0 JF S Z co 0 z0 ai (n ...6 (a (n N (n (n u) (n U) u-i uD (n ui v) u) (n uD ui 0 Q M (O O N O 7 0) a) co co CO 1- W 1- co co in N () N O u) CO N N W N V W N W W N- 1` (O N O W N 7 V u) N N W N- V uI W 6 R N at N N O C co N. N 1� W 0 N W (0 c0 co u) co co u) co 0) N. N N- N. W 0 O) a) O N N M 4 co D) u] W h MQ. C S2 N N N N N N N N M C) C) C) C) M N M C ) M C) C) W W I- 0 0 a V N. V d' M n W u) W W W N CO CO W (0 N CO CO CO V N n 0) N W N. n a) N u') co co co O V W d, M N O M N- W W NM M W 1f) N- If) W Cr; O O M V 0 o M 7 u) W W W O M M W N. N- CO W (O u) Q) N- N- N- N- CO CO CO CO W W 0) W 0) T Of O) al m 01 W C q .4 q q q o v v v v v v q v ay v zz r u) o co N co u) _ N 7 N R R N .- CO N- W CO u) I- M i- CO T Cl. O u) W CO (o W O (O N O C C C u) 00 m N 7 l!) W W O) co (O W W 1. W N N N N N N co co co co co co co 7 7 7 V 7 4 C CO) N N. N N. n N. N n N N N. n N N. N N N. N N .... CO- 06 OD co- W W co- W c0 a0 ap OD U) aD W W co- W W 00 p E u) 6 co co W co M cO W u) M CO u7 CO CO W 0) W cO 0 CO a) O) O) 1� M a) W W 0) W 0) 0) 0) O) M N- N- M M M O N N- O Co M OD W in W CO in O V in M co M M V u) N in C u) W u) C C (O (O N. W W N. W N N N N N N N N N N N N N N N N N N N N Q C. a COY CO N. N- O W co W N- Of M co O) O N W O) O W R N M M M 4 V V V co u) to (O W 1� 1` N. co V N Q O N6 W W W W 6W W W a0 a0 W W O W W O) O co co co co co co co co W co co W co co co co W co W a) 1 (0 o T N CD co c W Q O CO {n L 10 N N c O 2 o .- d) N z a a 0 a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .— O ' 0 0 N— 0 0 .— 0 •— 0 0 v IP N D, o (ri ao 0 o ao o co o 00 0 o co 0 o ao O ao 0 0 W N O ,- C O O V C) N O ca O O O o O co o N O O ,.�m ` W ul co 1- CO. W O) CD O O N N M 7 u'1 u7 CO f� ^O N (N (N (N N. (N N Di `ND q ti C c r S.T.W ay a o) c o m F o •o r al a) w rn Z 0 a v) 3 0 0 `- op M O V V M O O CO 0 0 (D 0 CO N 0 Ln Ln V O n CO 0 0 N V O O O 0 e- N V Ln D. 0 O N V 0 a Ln O O O O O O O O 0 O 0) 0) 0) O 0 O O 0 '� Q p)0) 00 0) 01 CO 0) 0) Q) 0) CD 0) W CO CO CO 6) 01) W 0) O) m 0 T d CO C C U - N 2-7 LL T... I-- N U U 0 C C CO O) O) OD n LD LO Ln 0) M W O (O V CO M V (D L)) cori. a. N. 0 N O Ln L0 CO 0) (O 61 O N. ,- CO In CO N (O= = N V V O OO O tD V 00 OO M Ln LO 0 O V 00 M M LO OO a (O (O n 0O 00 0) 0) 0) O NM0OW N N V V V V V VLc) LU LnLn o co CI) x O O 0 0 v O O N O 0 0 a 3 DI CI m o o o 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (0 0) 0) Z Z o O 0 o O O O O O o 0 0 0 0 0 0 0 0 0 Q N N N N N N N N N N N N N N N N N N N NN- n 0 e- 1- e- 1- 1- 1- a- .- ,- ,- a- e- .- I N` N E O O aN- N E y co d E J O m 0)2 a W N V 0 0 O 0) CO n CO D. CO Ln N. (D N N CO 0 CO CO Ln CO N (O CO N CO N- N V 0 O O N N M Ln CO M N- N. L[) O) 0) 6 N M M N ii 0) 0) 0) (O co O) LO 0) O) N- 0) O) N 0 0 0 CO N U 70) O LO V CO CO CO N N O O 0) CO CO O n CO Lf) Ln C O C ,- ,- ,- ,- ,- ,- ,- .- ,- ‘- O O O 00 ,50 O d L - (0 O co o co co co co co co W co co cc. co co o 00 co w N Cl) •t...' O O (O CO CO CO CO O CO (O CO O CO O (D CO O O O d W W rt C 2 11:1 O C w, u io 'p C 2 y s 0) O O N� 0 M 0) CO e- N- V (O Ln 0) 0) N- V Ln L M ` C) U N�V LA ,- V O - O M N V V 0) CO LO V CO M 0 4 w N- 6) 0D N- 6 0) O Lt) N LO W (O D 0) V M N a) 0 R N N 0N M V V V CO N N M V Ln V V M ✓ N w rg T A 0) N0 N Ln N LD 0 0 LO LO LO LO LO LO LO Ln Ln LO LD N t ) d C N N N Ln N Ln Ln N Ln N N U) LA Ln N N N 0 N p >0 0 O 7 R t" - M M M M M M M M M M M M M M M M M M M Q) 0) W 0) 0) 0) 0) 0) 0) 0) 01 0) 0) 0) O) 0) 6) 0) co J F 2 2 CO C1 Z Lc Ln Ln O Ln N Ln Ln LL[1 Lc) Ln Ln Ln U6 Ln Ln Ln Lf) LO O 0. N- o N- CO CO N 0 0) 0O CO V 0) O M U) () CO 0) O) CO N. M N. O) V 0 h 00 LO (O 0 N CO LO N- Ct N 61 00 O N 0 V (O M M LN CO co CO W M N V V •V 0_ V LD VCO V V co co co l0 � 00 O co O 0 O N N co co V N CO CO f� CO CO W o x_ M M— r q I Y I 1- Y Y 1. 1. v CO 7 W I— o U a_ .- 0 N M M (D M Ln N- N. V O N N 0) CO M 0 V m co O O N O O (D W CO W V O V 0) Ln M 01 V0 M V CO U) n 0D M W V Ln O Mop N (0 CO N O• N- 00 N- (O Ln V M M M V LO LD CO N ,- e- N M O m 0) 0) 6) CO 0) 6) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) W coco y V V V V V V V V V V V V ' .c V V V V V a 2 O V O) M CO O U1 N- CO CO CO M CO V 00 V CO N 00 (O N N. LO N- CO 0 O) V N N Ln N M D: O Ln M CO N N O O) O) N- (D U V M O ✓ V V V V V V V . co co co co co co co co co co to N. D. n r N. D. N- N N. n n N- N N N- r N ... W o 00 00 co- co- 00 O tD 0D CO OD co- co- 0O O co- co- co - co C ✓ N- N- N. V V .- V .- .- V N. N. V .- e- V V ✓ O O 0 V CO N O N N V (O (D V N N N V CO ✓ N- O V W V 6 N O h (O LD ti V N O N V Ln Ln CO CO CO CO OD N- N- CO Ln (O N. CO CO N- (D LO 0 N N N N N N N N N N N N N N NNNN N Q a m Q Y U) co co M O M M N N N. CO V N (D LO N LO CO N O) 0) 01 co 00 co co co CO N- N- CO O) 0) 0) 0) CO CO CO Q O O O O O O O O O O O O O O O O O O 0 D) O) co 0) O) O O) 0) W W 0) W 0) 0) O) W 0) O) 6) Co U a U a, m C co C a O N m 0 ` 1- ,- C O mN z a. a. o o a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C4 vO O 0 e- o e- 0 0 '- 0 0 e- 0 0 0 ■ N ], CO O O O 00 C) O c6O O ri O O 07 0 O O th vi el ,. j N- O 0 0 N CO O V O O N 0 0 N. 0 0 0 N CO e- O N CO m 0 O 0 .- N CO CO V Ln Ln CO N- CO CO W 4.4 `,de c N N N M co- M co- M M M M M M M M M M M M t6 uW� T y C E. — N. - 0O C) — - O - - Ni co '— 0 i'd Nc „ .O r2 ..- N N N N F S.j1 a o C m o V .0 al N m E-0 6 o m d m a A rn Z t°� a w33a E U) • N8 limoag, o m _ iMs zD. 'A ,m i — I a A ,,, N __N118 Fr t t. '■—_3 N 1 _ N 1, 1 it!! 1111111111m a.' 11. 0 W i ceo W;' ti 11 IVVI, g ■■ :� ■■■ g oz. CO ',,,, MENEM. _ ri A 'a 0 00 J N O8 = < m a u, yNNo v p N = _ v o ,- o - . o o 8 m_ a. • 1...... O 8 8 N N - eo N co I rs J _ s a 1 • I o N . t 55 i a$w` „mmr27EVW�MaRFF1Re v I p v 0 a3o ^n 24 m s� a — 2 se.Was�s$tmesmasR2a��� a8P0! 10V. '4' Iir,ORIMMIMIAHL § 6aogi 1188888888g8888888888.788 -o — 0;6° � uZ F 00088m R8ti8n8,8r88,rr8ry8 �' :. '31 °N3� 8� m n. • o = 38 88.88888 g ' o oo ' rrrrrrrr�rmm s , LAI a a ! at p R,I4F0A AM47,-.4 - ' - - i -. r 0 \ t 0 wv, Ted«p � a�� mmm � � —1 �.. _----- ,, t r m § 444w4 44444444444444 44 , m mryrvr�^ar;rirSmu'�ur4im`��a-v n'�.813ryr�. t � �mm^m1R ;mmI;;mme `mmmm ' / €� m mmm m ^mmmm^� ^ 7 i .20RMMR888m88A28884ZI84Z4$ AMPsAwaaH ERM4AAMVam;A -Q 28"Ro7,rr�8=9408 2S2Rmrea33m = s3a3ssss2mmmZmmmmmmmm8&a2 _ 0 '1-'' 1 9 -88s8888800 0 0 000 y 8 ^g * nr s� m 11112 NV.ar r mmm H «m<mm^mmo=Nmamm^mmm«FNr _ _ = n m b 3 m = m m s - V (ui/U 08) 4TdaU P311-13/1 311-11Mean Sea Level Ill 1101 01 Z Dm 0 43 ■■■■ =/ 1111 I. Z - -■ M ■■ ■■ © ■ 1111■ o i .....iime......LutzsmowNENg : --"millikW7.....7011K% MIIIIMBIllimm"A F-' P Fj 2.2,,,' I A 1111,0116 31A?,-J EITINIMITOpPOPPIP. c2c, . 1.11.111=M t-- -44 . __.2 ' W2'.83 IlMile � a� x - Mi EMil 'A _ IsW _ psi s 3 1 �ra■ilI■■ , is ^ q_110 8 cQo VA �.,M �,■ IFa^ ', ■1111 ENE..■ �� �9L _ o t� 0 I ,0°aoo© a _ I■■■U■■ a. 1111 ,L Q__ . z - -.-r 1......11: N ■11■1 — le I' 4' ■/i■■■■m =-. E. Q $ 1111■ NI CI 1111■■■AI trApi ■ ■ �� ■■■g■ a 1111■ 3�O ■ j-�� 8753 011 , - 6'G' ■■■■ ■ _ • 11.11 ■■■■■31 ■ •■ ■ 11111.1111■ 11.11111. Y1111111 •■■11 m m1• •U•• / Ya ap I ■■■■■■■■■ AG ry ._.. 1 1-,, w a$ ■■■■..■■ - A 8730 a 3n ■■■.. ■■■ iO-1, ■ •11 ' • 8 ■ c c7.1 1111111111 Lg.11. • ; PA■I ■■ , 2 ■ 1, .1111■■ rn Q 1111 AMEN.. 111111 ■■1111■11E■■■1111 4 0 IIIIINIMIIIIIIMIMIIIIIIIIIIIIMInA (uT/8 00Z)(+)quoLU(-)41nos s NM BP BAKER HUGHES Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-12-Slot 12 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 06 MD Reference: 19:12 7/7/1992 00:00©68.00ft(generic drilling rig) Site Error: 0.00ft North Reference: True Reference Well: 06-12 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore 06-12B Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 5 Offset TVD Reference: Offset Datum Reference Plan 5 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 10,845.87 to 13,883.10ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,585.21ft Error Surface: Elliptical Conic Survey Tool Program Date 8/19/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 10,800.10 06-12A GYD-CT-CMS Gyrodata(06-12A) GYD-CT-CMS Gyrodata cont.casing m/s 10,800.10 10,845.87 06-12A MWD Sperry(06-12A) MWD MWD-Standard 10,845.87 13,883.10 Plan 5(06-12B) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 13,883.10 8,730.38 2 7/8" 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 06 06-12-06-12-06-12 10,860.00 10,925.00 465.84 224.76 289.30 Pass-Major Risk 06-12-06-12A-06-12A 10,875.00 10,875.00 0.21 0.60 -0.38 FAIL-Major Risk 06-12-06-12BL1-Plan 3 11,474.85 11,475.00 2.25 0.98 1.29 Pass-Major Risk PB DS 13 13-09-Plan 13-09A-13-09A wp01 Out of range 13-17-13-17-13-17 Out of range 13-23A-13-23A-13-23A 13,808.30 11,000.00 1,527.05 282.13 1,308.25 Pass-Major Risk 13-24-13-24-13-24 12,450.00 10,575.00 946.60 681.15 308.45 Pass-Major Risk 13-24-13-24A-13-24A 12,400.00 11,275.00 219.63 634.43 -349.00 FAIL-Major Risk 13-24-13-24A-Plan#4 12,379.07 11,250.00 227.53 621.88 -332.22 FAIL-Major Risk 13-28-Plan 13-28A-13-28A wp03 Out of range 13-33-Plan 13-33A-13-33A wp01 Out of range 13-37-13-37-13-37 Out of range PB DS 14 14-26-14-26-14-26 13,775.00 11,600.00 865.18 296.88 630.09 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/19/2011 1:56:11PM Page 2 of 15 COMPASS 2003.16 Build 73 S . I•„ --- o MEM c EMIoII •L U • 04,4 • t 4 ; / 1 0 I- p a O E 6] ry n _ _ 0 ... c "w x roa .. J N t • ~ co 0 i.. II �e I. I'ii f/1 x I- O O. c0i g m to L `Uo 'E 0 c .111.11 C m U 111 C C d C 'y a = C ® III c o K (..,111 ;g i4 et11 1I Q L C C n III Q U 0 a I-� m • + a Cl al nA n R y N_ II2 N I Q O S f CO 2 K IiI U O I O1111 I •al O • • LI- 100 Q V o Z • = i2 ° Q • • • f7 C 2 �• g o ^ a c r a c 1.9. = c • J t, MIA _ (13 r O O ff' ••• ••• ► Y Z 0 U a 0 _ m • • .... "IS.• �Z O ! ;: ' • �I ao � 1n 20f— •• u� a 2 p U fillMNa V W co E Et OET. 0 _ U f i Z V c. •U U . W EN c ••• I a U V m 111 111 rem 'i € U\ 1' II I I ' 1 I , • f•• 3 ,IMII i U U I1�1 ' s • 0 L N 111 U Y3 2 i ... N U r O a MEM c - -_ f H C.) I =x U •••••••••••••••..I I ��`r I' O D `• s • N o I II `� ...-- lie Zu. r a � � � ct m 3 2 ; Cl) a a ; `. .- AIL O O U o 2 p 0 Cl. y m • 0 N ill 1 0 I► m � am • om J U J Q_1 Z(7 a U. c U V a U i U 1 V 1 11" m N N ....CI U 0 1 LL . C 111 1111 U 1 Z co m I I ! 1 / V 111 111 V O o ?P♦ X = a Alaska Department of Natural Resources Land Administration System Page 1 of 1 Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources I ting Alaska DNR Case Summary File Type: ADL File Number: 28311 6 Printable Case File Summary See Township,Range,Section and Acreage? Yes No New Search I LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28311 Map Search for Status Plat Updates As of 09/06/2011 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E.BENSON BL ATTN:LAND MANAGER-ALASKA ANCHORAGE AK 995196612 Case Type:784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location:DOG DIV OIL AND GAS Case Status:35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility:DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction:AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 010N Range: 014E Section: 01 Section Acres:640 Search Plats Meridian: U Township: O10N Range: 014E Section: 02 Section Acres:640 Meridian: U Township: 010N Range: 014E Section: 11 Section Acres:640 Meridian: U Township: 010N Range: 014E Section: 12 Section Acres:640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-132 ION 14E UM 1,2,11,12 2560.00 U-3-7 End of Case Summary Last updated on 09/06/2011. Not sure who to contact?Have a question about DNR?Visit the Report technical problems with this page to the Site optimized for Netscape 7, IE 6 or above. This site also requires that all must be accepted. State of Alaska Natural Resources LAS Home Copyright Privacy System Status http://dnr.alaska.gov/projects/las/Case_Summary.cf n?FileType=ADL&FileNumber=28311... 9/6/2011 Alaska Department of Natural Resources Land Administration System Page 1 of 1 'flapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number. 28312 4+Printable Case File Summary See Township,Range,Section and Acreage? Yes No I New Search LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28312 Map Search for Status Plat Updates As of 09/06/2011 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E.BENSON BL ATTN:LAND MANAGER-ALASKA ANCHORAGE AK 995196612 Case Type:784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location:DOG DIV OIL AND GAS Case Status:35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility:DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction:AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 010N Range: 014E Section: 03 Section Acres:640 Search Plats Meridian: U Township: 010N Range: 014E Section: 04 Section Acres:640 Meridian: U Township: 010N Range: 014E Section: 09 Section Acres:640 Meridian: U Township: 010N Range: 014E Section: 10 Section Acres:640 Legal Description 05-28-1965***SALE NOTICE LEGAL DESCRIPTION*** C14-133 T10N,R14E, UM 3, 4,9, 10 2560.00 End of Case Summary Last updated on 09/06/2011. Not sure who to contact?Have a question about DNR?Visit the . Report technical problems with this page to the . Site optimized for Netscape 7, IE 6 or above. This site also requires that all must be accepted. State of Alaska Natural Resources LAS Home Copyright Privacy System Status http://dnr.alaska.gov/projects/las/Case_Summary.cfm?FileType=ADL&FileNumber=28312... 9/6/2011 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME Pei/ c2 -% O' PTD# 4::P // l / 5 V Development Service Exploratory Stratigraphic Test Non-Conventional Well �" FIELD: >,e�/Q�O4",�'�y POOL: P.e�Q 2L )4Y�G Circle Appropriate Letter/ Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 O a o 1- 'a co 0 'a 3 --I R1 O cn 'a o co ° 3 cn ° 3• r O 3 . O (O CO 7 0 N - m O0 N d D D N 0) 7 0 m 7 O 0 O a O (D -, _, _, _, W CO W W W W W W W W N N N N...) N...) N N N N N (o CO V O 01 A W N o n (0 CO V C) 01 A W N - co co co V 0) 0, A W 1J -, 0 (0 CO CO (J) A W N - O V m O 0) 0) 0m CD o OOOa- ° 0 0 0� c� 000) o vDg0mvppo, C CD CD CD 0 0 n O 0 CD (D N 0 CN 7' p p C Q Q co a v C o = n) (D 0 a -0 Q c T o m o X a) 7 (D 7) 0 O o = (D N tl) -1 -1 - o, 7 CD N 7 (D (D 0 N N N 0° 7 co r— m ° m 3 v . v C 'c m m m (0 (D Q m CO SD< < c m o o 3 m v ` (' 0 0 0 o .0. a N = F -o N ii; m o. w = o o 0 c a Heli v 0 0 ? C) n0) C) * 7c 0 7 m -1 co a C N (D O" O o Q < N 0 0 CD 7 N N 0 7. N 0 0- (D < p) N O a a N 0 -• (D 0' 7 7 N ° d n) CD CD CD N 3 N 7 3 (U 7 0' 0 y < N N .N. CD 3 Q 0• O' O" 0 a 0- a Cr 0)) • C- Ti(D E. << (D (D 00 0 0 0 3• 70 N N m j (D 7 '' O- 7 `2 (D 0 0 N N a -O -O = N N N O p (D. 7• 7 N 0 (n Q N `2 a 7 (o 0 O n) (O n) n) N N (O 7 7 -0 (n N -0 �: (D (O N 3 !n D 90a O (n o 7 C .F. (n -' 0 (O 3 0) O- (D _ 0 a - (- D N l0 "O CA A j' '0 C C n Q O N (0D O. (D 7 O O --� 7 C '0 0 O• 3 3 N co 3 "a N O 0 (D 7 (D 0 O N N, N a 7 -0 m w Q 7 (O o a o o m o 3 w o Q a a o < a a . 7 O o Z ° N .C-. "0 a (� o O A C 0 '.,. 0 < .. - < . a coN 7 a s O 0 n o m v m * o m • 1D 0 m 7. o m N - m a m 0 m * * m . N N' m Z 3 7 O 7 ° "O 0 (On O (D 3 N N W (n 7 n O a a) n a . N •On) 73 N , , O- C N 0 0; * 0 s m o m * a co 3 m o m ° ° 7 c w ° c m c o 0 o Q m m c7) c7) ° 3 m x � 3 =. O < a o v' v m 3 0 ° a o co m ° o c c o < 3 ' 0 0 0 0- 0 D C ( `< (n CO (D Q �.O 7 0 b N .0-. O * 7 N Q O C L�2 O O (nom _ 7• 7 .0 s N -o m s D 7 A o Sp o 7 7 7 0 'm 3 7 '7 0 = 3 3 'D O (7(° (0 N 7 N 7 7 CO 13 .�.. (o 0 0 00 0 7 O C '0 'N N Q 7 (D �O a- 7 O a O z— m CO 7 (n CO N c c O o- w o v a Q0 ° o Q 0 0 a �- `.< H N 0 (c o = o n CO o \'7 fit ii .N-. N 7 C O N a 7N. v_' 0 7 v m 3 N C m d °0 7 o N co p nQ -°p mc 7 ,< C co a, m 7 C = (D N O O o l0 (fl (n N n N ND O N 3 0 O co < S O 0 p d 7 O. 7 F w m O 0) o * O N N O 7 O " N 7 0 * 01 3 S 7 O 3m a m `< � c LT _ C 0' TI o" II m -I Z Z Z Z Z Z -< -< -< -< -< -< Z -< -< -< -< -< Z Z Z Z Z Z Z -< -< -< -< -< -< -< -< -< -< -< -< Z Z D D D D o D 2 On N 2 2 N D (on N y N N D D D > D D D can) 2 of 53of of 53532 °n 53 D D 0 —1 m O < CO CD z > K g m w o m (n cn c� Z o X D X m o co = Q a, 4 D 7 COcri 0 m x s r.) m 7 m or a o ^ < 7-0 0 (D 3 V -0 (0- .0Y (D (D 0 0 D) Z co ei N 3 Q `< -0 CO 0 0 N 0 = 0 o) 7 : o m 7 w v ° 0 N CD 3 N N) 0 7 (n (D H. 0 N N N 7 OD co N (n -0 7 '6 N (D O- nl 7 0 (o n co. N .< .». W CO (O (O *k (D (A 7 .(1N 7 D W (� N N 7 N 73 < "' 0) o O 7 � A 0 C co CO 03 O- fin - C co a, ? N v 7 O) O 0 7 0 N (D (D a O '0 7 (D 0 CJ co = CO 0 7 CO W -• co O N 0' (n O D mm j O) 0 p A - Q 7 O O 0o v (A m m n ° D W D -< CO CD co 7 0 (n' -c o a o Cr D °) C w Q w 0) m -0 0 m _, _ ° • Z C O °) o V a , 3 m m D - '0 to CO -7' ° Q OOj °' rn a --a (0 v (n -0 0 0 - a mum_m cn mco _ v a _, N 7 O N CD 0 = 0 O N CO a O 7 CO N 7J co a CA — o < N n co n 0 m 0 3 0 N < a 0 A(n - •O (n m 0 3 m 7, o < C N a 0 n 270 < 7 7 co . 0 m x G) c D 7 m C _ ✓ Q 0 O (D W �o 0 0 c 0) v