Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout185-071 Imag~roject Well History File CoverOge XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. i _5':--- .o_¢.1 v,,e . . . , .' , .e Organizing (done) RESCAN DIGITAL DATA [] Color items: [] Diskettes, No. [] Grayscale items: n Other, No/Type [] Poor Quality Originals: [] Other: ~ NOTES' OVERSIZED (Scannable) [] Maps: [] Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds [] Other BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE.: Is~ Project Proofing BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELl_ DATE: /S/ Scanning Preparation ~ x 30 : ~__~)+ ¢,~) : TOTAbPAGES ~:~;~'0 BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: IS! Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: ~ PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION' ~'~YES NO IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES NO Stage 2 (SCANNING IS COMPLETE ~..1;1111l.~..~ UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY. GRAYSCALE OR COLOR BY, AGES) RESCANNED BY; BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE; ~si General Notes or Comments about this file: Quality Checked (done) 10/25/02Rev3 NOTScanned.wpd 0 WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. November 2, 2010 Attn.: Christine Shartzer 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Plug Setting: 1R -06 Run Date: 10/29/2010 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention o£ Minton Wood, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 1R -06 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50- 029- 21331 -0 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Klinton Wood 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907 - 273 -3527 Fax: 907 - 273 -3535 klinton. wood @halliburton. com Date: Signed: / • :. ~ ~~, PROACTIVE DIACINOSi1C SERVICES INC. ~L~ ~a ~~~~~~~ To: AOGCC Christine Mahnken 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 (907) 659-5102 f, RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C ° °' a x? ? ~~~(t ic; ~,~ ~.. ~ _ .P. Anchorage, AK 99518 ~ ~ ~~ ~~ ~'~ ~~ } ~w, Fax: (907) 245-8952 1 j Caliper Report 16-Jun-10 1 R-06 1 Report / EDE 50-029-21331-00 2J US ~ t~55~-v~'l I `~`~~~~ ~~~, ~', ~ r"' a ~, ;; ' ~ r, Signed : Date ~' ~ ~ ~ . . Print Name: ~` *~` = ®~~, .~~ _r; PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-88952 E-AAAIL : ~~saraes~carSg°Caa~~errlcsrVEC€a.~~rn WEBSITE : ~n~N.~rerssarVlog.cacra C:\Docinnents and Settmgs\Diane Williams\Desktop\Transmit_Conoco.docx • • Memory MuttrFnger Caliper S Log Results Summary Company: ConocoPhillips Alaska, Inc. We11: 1 R-06 Log Date: June 16, 2010 Field: Kuparuk ~, Log No.: 10840 State: Alaska Run No.: 2 API No.: 50-029-21331-00 Pipet Desc.: 3.5" 9.3 Ib. J-55 EUE 8RD Top Log Intvl1.: 8,787 Ft. {MD) Pipet Use: Tubing & Open Hole Bore Bot. Log Intvl1.: 8,$33 Ft. {MD) l Inspection Type ; Whipstock & Mill-Out Window Inspection C(j-MMENTS This caliper data is tied in with gamma Ray to the K1 marker. This log was run to assess the condition of the whipstock tray and mill-out window far understanding of the 2- string window geometry and the location of any possible obstructions. The caliper recordings indicate the whipstock tray is positioned from ~-8,821` to 8,825', the 3.5" x 7" annulus runs from ~-8,825' to _8,826', and the open hole bore runs from 8,826' to 8,833' {end of interva! logged). Slight doglegs in the downward 1 direction are indicated in the open hole bore at -8,827, -8,829', and -8,831'. The caliper recordings indicate no significant LD. restrictions or other possible obstructions throughout the interval logged. 3-D log plots of the centered and off-center caliper recordings highlighting these features are included in this report. This is the second time a PDS caliper has been run in this well and the first time the whipstock tray and mill- outwindow have been logged. Field Engineer: G. Ethertort Analyst: C. Waldrop Witness: J. Newel! & P. Nezaticky ProActive Diagnostic Services, Inc. / P.O. Box 1369, Stafford, T,{ 77497 Phone: (281) or (888) 565-9085 Fax: (~81) 565-1369 E-mail; PDS a~memorylog.com Prudhoe Bay Field Office Phone: (907) 659-2307 Fax: (907} 659-2314 t • • PDS Mu(tifinger Caliper 3D Log Plot ~~, Company : ConocoPhillips Alaska, Inc. Field : Kuparuk Well : 1 R-06 Date : June 16, 2010 Description : Detail of Centered Caliper Recordings Across Whipstock Tray 8 Mill-Out Window. Comments Depth Max. I.D. (ins.) 3-0 Log Image Map (Centered) 1ft:30ft 2.5 3.5 297° 0° 90° 180° 270° 0° Min. I.D. (ins.) _ 2.5 3.5 Nominal I.D. (ins.) 2.5 3.5 8$15 ~- +--~-~-- --t-~--F __ Joint 278 r I 8820 Whipstock Tray with Manufactured tiuide Sbts Joint 279 8825 i I I i 8830 i ._ _ ~,. -:,, -_ ~~, ~.,~. ~:_.,.- l- i • • PDS Multifinger Caliper 3D Log Plot ~~ Company : ConocoPhillips Alaska, Inc. Field : Kuparuk Well : 1R-06 Date : June 16, 2010 ' Description : Detail of Off-Center Caliper Recordings Across Whipstock Tray & Mill-Out Window. Image Map (Off-Center) 0° 90° 180° 270° 0° ip ~ i, F~ I ConocoPhillips Alaska, Inc. • KRU 1 R-06 1 R-06 API: 500292133100 Well T e: INJ An le TS: 39 de 8580 sssv (i9o8-t9o9 SSSV Type: TRDP Orig Com letion: 5/15/1985 Angle @ TD: 22 deg @ 9303 , OD:3.500) Annular Fluid: Last W/O: Rev Reason: TAG FILL Reference L Ref L Date: Last U date: 12/6/2004 Last Ta : 9026 TD: 9303 ftKB Last Ta Date: 1 1 /1 212004 Max Hole An le: 60 de 3100 Cesin Strin -A LL STRINGS Descri tion Size To Bottom ND Wt Grade Thread CONDUCTOR 16.000 0 110 110 65.00 H-40 SUR. CASING 9.625 0 4659 3694 36.00 J-55 PROD. CASING 7.000 0 9278 6975 26.00 J-55 Tubin Strin -TUBING Size To Bottom ND Wt Grade Thread 3.500 0 8932 6662 9.30 J-55 EUE 8RD Perforations Summer Interval ND Zone Status Ft SPF Date T e Comment 8582 - 8588 6379 - 6383 C-4 6 12 6/30/1985 IPERF 5.5" HJ II Csg Gun;120 deg hase 8692 - 8742 6465 - 6505 C-1,UNIT B 50 12 6/30/1985 IPERF 5.5" HJ II Csg Gun;120 deg hase 8860 - 8867 6601 - 6607 UNIT B 7 12 6/30/1985 IPERF 5.5" HJ II Csg Gun;120 deg hase 8976 - 8984 6700 - 6707 A-4 $ 4 6/30/1985 IPERF 4" HJ II Csg Gun' 90 deg. h 8994 - 9024 6715 - 6742 A-3 30 4 6/30/1985 IPERF 4" HJ II Csg Gun' 90 deg. h I 9028 - 9038 6746 - 6755 A-3 10 4 6/30/1985 IPERF 4" HJ II Csg Gun' 90 deg. h Gas Lift M andrels NaNes St MD ND Men Mfr Man Type V Mfr V Type V OD Latch Port TRO Date Run Vlv Cmnt 1 2041 1964 Camco KBUG DMY 1.0 BK 0.000 0 11/9/1987 2 4326 3449 Camco KBUG DMY 1.0 BK 0.000 0 1/10/198 3 5631 4356 Camco KBUG DMY 1.0 BK 0.000 0 1/10/198 PBR aa2t x422 4 6285 4788 Camco KBUG DMY 1.0 BK 0.000 0 6/30/1985 ( - ' OD:3.500) S 6762 5104 Camco KBUG DMY 1.0 BK 0.000 0 1/10/198 6 7198 5396 Camco KBUG DMY 1.0 BK 0.000 0 6!30/1985 PKR 7 7615 5684 Camco KBUG DMY 1.0 BK 0.000 0 1/10/198 (84358436, 8 8061 5996 Camco KBUG DMY 1.0 BK 0.000 0 1/10/198 OD:6.156) 9 8381 6226 Camco MMG-2 DMY 1.5 RK 0.000 0 1/10/198 Prod uction MandretsNalve s St MD ND Man Mfr Man Type V Mfr V Type V OD Latch Port TRO Date Run Vlv Cmnt 10 8473 6295 CAMCO MMG-2 DMY 1.5 RK 0.000 0 1/21/199 11 8544 6349 CAMCO MMG-2 DMY 1.5 RK 0.000 0 1/21/199 12 8890 6626 CAMCO MMG-2 DMY 1.5 RK 0.250 0 4/21/2002 Other lu s ui .etc. -JEWELRY De th ND T Descri lion ID 1908 1850 SSSV Camco 'TRDP-1A' (NOT Locked Out) May hang up on Tool String; MCX Pulled 5/21/95 2.812 8421 6256 PBR Baker 3.000 8435 6266 PKR Baker'FHL' 3.000 8909 6642 PKR Baker'FB-1' 4.000 8924 6655 NIP Camco'D' Ni le NO GO 2.750 8931 6661 SOS Camco 2.992 8932 6662 TTL 2.992 Fish -FISH De th Descri tion Comment PKR 9145 1 1/2" GLV Valve Dro ed• Could Still be in Tubin Strin (asoaas~o, General Notes OD:6.156) Date Note NIP 1/27/1998 NOTE on Schematic: TRDP is NOT Locked Out and may hang up toolstring if control line pressure bleeds down. (89248925, OD:3.500) TUBING (0-8932, OD:3.500, ID:2.992) Pert (89768984) Pert (8994-9024) Pert (902&9038) RECEIVED STATE OF ALASKA ~ ,jU~, ~ J ZQ1O ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPO~I~~~'~C°~"ISSion 1a. Well Status: Oil ^ Gas ^ SPLUG ^ Other ^ Abandoned ^ Suspended ^ 20AAC 25.105 20AAC 25.110 GINJ ^ WINJ ^ WAG ^ WDSPL ^ No. of Completions: 1b. Well Class: Development ^ Exploratory ^ Service ~ Stratigraphic Test ^ 2. Operator Name: ConocoPhillips Alaska, Inc. 5. Date Comp., Susp., or Aband.: June 16, 2010 12. Permit to Drill Number: y 185-071 / 310-146 3. Address: P. O. Box 100360, Anchorage, AK 99510-0360 6. Date Spudded: May 5, 1985 13. API Number: 50-029-21331-00 4a. Location of Well (Governmental Section): Surface: 272' FNL, 222' FEL, Sec. 19, T12N, R10E, UM 7. Date TD Reached: May 13, 1985 14. Well Name and Number: 1R-06 Top of Productive Horizon: 4159' FNL, 3636' FEL, Sec. 19, T12N, R10E, UM 8. KB (ft above MSL): 84' RKB GL (ft above MSL): AMSL 15. Field/Pool(s): Kuparuk River Field Total Depth: 4376' FNL, 3925' FEL, Sec. 19, T12N, R10E, UM 9. Plug Back Depth (MD + ND): 8913' MD / 6649' TVD Kuparuk River Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 539470 y- 5990930 Zone- 4 10. Total Depth (MD + ND): 9303' MD / 6998' TVD 16. Property Designation: ADL 25635 TPI: x- 536091 y- 5987026 Zone- 4 Total Depth: x- 535804 - 5986808 Zone- 4 11. SSSV Depth (MD + ND): 1908' MD ! 1850' TVD 17. Land Use Permit: 2568 18. Directional Survey: Yes ^ No a (Submit electronic and printed information per 20 AAC 25.050) 19. Water Depth, if Offshore: N/A (ft MSL) 20. Thickness of Permafrost MDlTVD: 1550' MD / 1550' TVD 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): none 22. Re-drill/Lateral Top Window MD/TVD not applicable 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE NTING RECORD AMOUNT CASING SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEME PULLED 16" 62.5# H-40 Surf. 110' Surf. 110' 24" 215 sx CS II 9.625" 36# J-55 Surf. 4659' Surf. 3694' 12.25" 1390 sx Permafrost E, 425 sx PF C 7" 26# J-55 Surf. 9278' Surf. 6975' 8.5" 51o sx Class G, 250 sx PFC 24. Open to production or injection? Yes ^ No O If Yes, list each 25. TUBING RECORD Interval open (MD+ND of Top & Bottom; Perforation ize a d Number): SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 9 '-9038' MD 6745'-6754' ~~? 3.5" 8932' 8435' MD / 6266' ND 8582'- 88' MD 6379'-63 ND 8909' MD / 6644' ND ~ ~ 8692'-874 D 6465' 05' TVD ~_~~J ~ / 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 8791'-8803' M 4'-6557' ND ~ PI~IO~ ~~ DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 8819'-8831' M 9'-6579' ND 8582' MD 38 bbls 15.8 Class G 8860'-8867' D 6601 - 07' TVD 8976'- 85' MD 6700'-670 ' TVD 8 4'-9024' MD 6715'-6741' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) plugged with cement Date of Test Hours Tested Production for Test Period --> OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing Press. psi Casing Pressure Calculated 24-Hour Rate -> OIL-BBL GAS-MCF WATER-BBL OIL_GRAVITY -API (corr) 28. CORE DATA Conventional Core(s) Acquired? Yes ^ No ~ Sidewall Cores Acquired? Yes ^ No If Yes to either question, list formations and intervals cored (MD+ND of top and bottom of each), and summarize lithology and presence of oil, gas or water (Submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results perr~20 AAC 25.071. ts~' a~e~r „Ass+ .._ NONE Form 10-407 Revised 12/2009 NTINUED ON REVERSE Submit original only 0~ 7 2 !' /d i~ 28. GEOLOGIC MARKERS (List all formations and markers untered): 29. FORMATION TESTS NAME MD TVD Well tested? ^ Yes ~ No If yes, list intervals and formations tested, Pemlafrost -Top ground surface ground surface briefly summarizing test results. Attach separate sheets to this form, if Permafrost -Bottom 1550' 1550' needed, and submit detailed. test information per 20 AAC 25.071. Top Upper Sand 8581' 6376' Base Upper Sand 8740' 6502' Top Lower Sand 8958' 6682' Base Lower Sand 9088' 6798' N/A Formation at total depth: NA 30. LIST OF ATTACHMENTS Summary of Daily Operations, schematic 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Gary Eller @ 263-4172 Printed Nam V. Ca Title: Alaska Wells Manager ~r ~~ ~ Signature Phone 265-6306 Date / U `~ Sharon Allsup-Drake INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of (ands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelty Bushing and Ground level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 29: Provide a list of intervals tested and the corresponding formation, and a brief summary of this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 ~~~1 ~ KUP _ ~ 1 R-06 ~(~~~~~~~~~~~ ~~ ~' ~ Well Attributes ~~ .~ ~_- - Max Angle 8 MD TD i ~ Wellbore APIIU WI 'Field Name ~ Well Status lncl (") MD (ftKB) Act BM (ftKB) '-""''e'° " " m ~ / ~ 500292133100__ LKUPARUK RIVER UNIT I INJ ~30 ~ 3,100.00 ', 9,303.0 J ~ Comment rH2S (ppm) Date An Cation ~'Entl Date KB-Grd (ft) ;Rig Release Date 3761 5/15/1985 SSSV TRDP I Last WO: N!~cene9 1R-Qa, 8111 - SGUVrlepc (20 Actual , , Annotabon (Depth (k K6) End Date Annotation Last Mod By End Date _ . Last Tag' RKB I 8,584.0 6/8/2010 Rev Reason: Perf, Cmt Sqz, Tag TOC. Mill Imosbor 6/11/2010 Casin Strnn s CONDUCTOR, ,; _ String OD ~ String ID Set Depth Set Depth (ND) String Wt String 110 '. Casing Description (in) (in) l Top (ftKB) (kKB) (ftKB) (Ibs/ft) Gmde String Top Thrd sAFETYVLV, _ _ _ ,, CONDUCTOR t6 15.062 0.0 110.0 110.0 65.00 H-00 WELDED 1'908 SURFACE 9 5/8 8.765 0.0 4,659.0 3,693.3 36.00 J-55 _ - _ _ _- PRODUC710N 7 6-151 0.0 9,2780 6,974.8 26.00 J-55 GAS LIFE. -_..__ _. z.o4, .,. _. ___ _.._.. _-- __ ____. - _. _-_. -. Tubing Stnngs _ - _' _ ___ _ _ _ Str rag OD String ID Set Depth Set Depth (ND) String Wt Str g ' Tubing Descnption (~n) (in) Top (kKB) (kKB) (ftKB) (Ibs/k) G d Str g Top Thrd GAS LIFT, 6,328 - it 1 UBING 3 V2 2 992 0 0 8,932.0 6 662.6 9 30~J 55 _EUE 8RD j - Fish & R t ievabl etc ) H l All J l T bi R Oth I suRFACE. __ 4,659 , r e, . er o ry: u ng un e n e ( ewe _ _ -- - Top Depth 1 (TVD) Top Inc! GAS LIFT, 8831 . - Top (ftKB) (kKB) (°) Description Comment Run Date ID (in) 48 SAFETY VLV Camco'TRDP-IA-SSA (FLAPPER ONLY LOCKED OUT 5/5/2010 2.812 1 908 1 850 2 29 , j]'~ , , . . 5/5/2010) May hang up toolstring if control line pressure ~ bleeds down GAS uFr, . 6.285 `'~° 2,041 1,963.4 _ 33.00 - GAS LIFT ! - -_ ~CAMCO/KBUG/11DMY/BK!// Comment: STA 1 -_ _ 11/9/1987 - 2.875 4,326 3,4494 4326 GAS LIFT ICAMCO/KBUG/1/DMY/BK/I/Comment: STA2 11/10!1987 2.875 GASUFr,_.. s,]s2 5,631 4,355.81 49.37 GAS LIFT ICAMCO/KBUG/1/DMY/BK/// Comment: STA 3 11/10/1987 2.875 p. 3 6,285 4,787.5 _ 48.27 _- GAS LIFT - _. _. _ CAMCO/KBUG/1 /DMYlBK/// Comment: STA S ___ 6/30/1985 - - 2.875 GAS LIFT.__.__ ],1gg ~" 6,762 5,103.8 48.32 GAS LIFT CAMCO/KBUGl1/DMY/BK///Comment: STAS 11/10!1987 2.875 7,198 5,396.3 47.03 GAS LIFT CAMCO/KBUG/1/DMY/6W//Comment STAG 6/30/1985 2.875 GAS uFT, _ _ ~ 7 615 5 683.6 46 05 GAS LIFT CAMCO/KBUG/t/DMYIBK!// Comment: STA 7 11/10/1987 2.875 7.615 }' ~ 3 8 061 5,995.8 __ 44.95 - GAS LIFT - - --__. CAMCOlKBUG/1/DMY;BK/// Comment: STA 8 11/10/1987 _ 2.875 GAS LIFT 8,381 6,225.8 42.60 GAS LIFT CAMCO/MMG-2/1.5/DMY/RK/// Comment: STA 9 11/10/1987 2.922 , _. - 8,061 8,421 6,255.8 41.30 PBR Baker PBR 6!30/1985 3.000 I 8,435 6,266.1 41-09 PACKER IBaker'FHL'PACKER 6/30/1985 3.000 ~ GAS LIFT. _ _ 8,473 6,294 6 ( 40.50 PRODUCTION ~CAMCO/MMG-2l1.S;OPEN//// Comment STA 10 112111993 2.992 8,381 39.40 PRODUCTION _ _ _ _. _ _ CAMCO/MMG-2/1-6/DMY/RK///Comment: STA 11 5/21/2010 2.992 8,8 0 6,626.0 33 19 PRODUCTION CAMCO/MMG-2/t5/OPEN//!/Comment: STA 12 5/21/2010 2 992 PBR. 8,421-- ~ _ 8,909 6,643.9 32 57 PACKER Baker'FB-1' PACKER 6/30!1985 4.000 8,921 6,653.1 3202 CIBP - _ 2.69"CIBP 5/26/2010 0.000 PACKER. e,a3s 8,924 6,656.0 3185 'NIPPLE Camco'D'Nipple NO GO 6/30/1985 2.750 ~ 8,931 6,661.7 31.61 SOS Camco 6/30/1985 29921 PROOUCnDN, _ - ___ - 9,6]3 „ ~ I I 8,932 31.46 6,662 6' ~ TTL 6/30/1985 ' 2.992' " I 9.145 6.852 0 ~. 22 94 FISH ~ 1 1/2" GLV Valve Uroppetl; Could Still be in Tubing Strang 3/15/1986 i PROOUCnoN, ~ '~ i Perfora tions & Slots 8,544 a. - _ - - _ Shol 3 ', Top (TV D) Btm (TV D) 'Dens -- Top (kKB) Btm (ftKB)', (kKB) (kKB) Zone Date (sh-~ Type Comment IPERF, ~ ' 8,582 8 58811 6,378.5 6,383.1!C-0, 1R-06 6/30/1985 12.0 IPERF 5.5" HJ II Csg Gun;120 deg phase i 8582-6.586 - E ' ~~ ~ ' i~, _. ; - _ - _ - __ __. 8,692 8,742 6,465.0 6,505.0'C-1, UNIT B, 6/30/1985 12.0 IPERF S.5" HJ II Csg Gun;120 deg phase , 1 R-O6 IPERF,- _ ___ _ %-`: 8,791 8,803 6,544 4 6,557.1UNIT B, 1R-06 5/29/2010 6.0 APERF 25" Millenium HMX gun, 60 deg sss2g]a2 _ z ~ , phase -' 8,8191 8,831 6,569.2 6,578.5 UNIT B, 1 R-06 5/29/2010 6.0 APERF 25" Millenium HMX gun, 60 deg APERF,_ _ _ _ _ ~ phase 8,]91-8,803 _ _ ~ ', 12 O'~IPERF 5.5" HJ II Csg Gun;120 deg phase 8,860 8,867 6,601.4 6,607.1 UNIT B, 1 R-O6 6/30/1985 APERF, _ _... _ - 8,976 8,9841 6,699.6 6,706.6 A-0, 1R-06 6/30/1985 4.01'IPERF 4" HJ II Csg Gun' 90 tleg. ph 8,61 s-6,631 -. '' :`+ .- - -8,994 9,024 6,715.3 6,741 2~1 A-3, 1 R-06 ,6/30/1985 4.0 IPERF 4" HJ H Csg Gun' 90 tleg. ph 'e ', 6,744.8 6,753 9.~A-3, 1 R-06 6/30/1985 4.0 IPERF 4" HJ II Csg Gun' 90 deg. ph 9,028 9 038 IPERF, c B,e6o-B,BS] ~_~ ~ ~ _. ,. _. __ _. ~ _. _. - _ _ - __. _ Notes: General8 Safety _ ._. End Date Annotabon _ PROOUCnoN, _ 4/232010 NOTE Suspect Tubing leak uenveen 8572' & 8868' fi.ess q Ci ~ - --- - -- - 6/7/2010 NOTE: MIII CIBP aQ 8913' CTMD w!2 69" B-Center Mill PACKER, 8,509 - ~ f CIBP, 6,921- - ~i%. 8p" CMT SOZ, _ 6.584 NIPPLE, 8,524 - _ C -: ;g I' sos, x,531 - -_. TTL, 8,932- - - :": IPERF. _.. _~~_-. 8,5]6-8,986 _ _- - i IPERF, 6,996-9,026 - IPERF, - _-_~„ ~` 5,028-9,038 _ FISH, 9,145- -- - ~~ PRODUCTION, 9,2]8 i TD(1RUS), 9,303 1R-06 Well Events Summary DATE SUMMARY 4/18/10 T-POT (PASSED), T-PPPOT (PASS ), IC-POT (PASSED), IC-PPPOT (PASSE, MITIA (PASSED), MITOA (PASSED) 4/21/10 DISPLACED TBG WITH 290 BBL SW FOLLOWED BY 20 BBL DSL. BRUSHED TBG TO 2.75" NIPPLE @ 8924' RKB WITH BLB AND 2.80" G/R. IN PROGRESS. 4/22/10 TAGGED @ 8986' SLM. SET 2.75" CA-2 PLUG & GAUGES IN D NIPPLE @ 8924' RKB. SET JUNK CATCHER ON PLUG. ATTEMPTED TEST TBG. PUMPED 50 BBL DSL, 1 BPM @ 1700 PSI. IN PROGRESS. 4/23/10 WITH HOLEFINDER IDENTIFIED APPARENT C SAND LEAK IN BLAST RINGS BETWEEN 8868' & 8572' RKB. RETURN IN 3 DAYS FOR C SAND BHP. 4/26/10 MEASURED C SAND BHP @ 8860' RKB: 2545 PSI. PULLED CATCHER @ 8891', PULLED CA-2 PLUG & DUAL PAN EX GAUGES @ 8924' RKB. FINAL A SAND BHP: 2998 PSI. COMPLETE. 4/27/10 (PRE CTD) PT & DD TEST SV, MV, SSV, DD &SSSV. JOB IS ONGOING. 4/28/10 PRE CTD PT SV, MV,SSV (PASSED ), DDT SV, MV, SSV (PASSED ), DDT SSSV FAILED ) 5/3/10 BRUSHED & FLUSHED SSSV; ATTEMPTED CLOSURE TEST, FAILED. DRIFTED TBG TO 2.77" TO D NIPPLE. IN PROGRESS. 5/4/10 RUN PDS CALIPER LOG FROM 8800' SLM TO SURFACE. SET F COLLAR STOP @ 1954' SLM, RUN FLAPPER CHECKER TO SSSV @ 1904' SLM. JOB IN PROGRESS. 5/5/10 LOCKOUT SSSV @ 1908' RKB. JOB IN PROGRESS 5/6/10 DRIFT TBG W/ 2 5/8" X 15' WHIPSTOCK DUMMY TO 8920' SLM. JOB COMPLETE 5/13/10 DRIFT TBG 2.76" TO 2.75" NIPPLE @ 8924' RKB. RE-LOGGED PDS MULTIFINGER CALIPER FROM TBG TAIL TO 7800'. DATA ACQUIRED. 5/21/10 VERIFIED FLAPPER OPEN ON SSSV @ 1908' RKB. PULLED DVs @ 8890' 8~ 8473' RKB. READY FOR CMT RETAINER. 5/26/10 SET HALLIBURTON 2.69" CIBP PLUG AT A DEPTH 8920.5'. CCL STOP DEPTH RECORDED AT8907.5'. CCL TO MID ELEMENT OFFSET MEASURED AT 13'. 5/29/10 PERFORATED USING 2.5" X 12' GUNS WITH 60 DEG PHASING, 6 SPF, MILLENIUM DEEP PENETRATING CHARGES. PERFORATED AT 8819' - 8831'. AND 8791' - 880., DEPTHS CORRELATED TO GAMMA RAY ON SCHLUMBERGER CBL DATED 6/8/85. 6/2/10 PUMPED 38 BBLS 15.8 CLASS G CEMENT, SQUEEZED APPROX 15 BBLS BEHIND PIPE, ACHIEVED 1200 PSI SQUEEZE PRESSURE, JETTED OUT TUBING TO TARGET TOC AT 8582 CTMD, FREEZE PROTECTED & TRAPPED 600 PSI ON WELLHEAD. 6/5/10 TESTED TBG TO 2500# 30 MIN.PASS.BLED TBG TO ZERO. Note: Witness of P/T & tag waived by state inspector Bob Noble. 6/6/10 ASSIST ASRC REPLACE 7" TREE CAP AND 2' RISER WITH 3 1/2" BONNET ON FLOW CROSS.TAGGED TOC @ 8526' SLM WITH 2.5' BAILER,SAMPLE OF CEMENT OBTAINED.EST TOC @ 8554' RKB.BLED TBG TO NO FLOW.READY FOR COIL 6/7/10 MILLED CEMENT FROM TAG AT 8565 CTMD TO STAL~CIBP) AT 8913 CTMD WITH_ WEATHERFORD MOTOR & 2.69 BI-CENTER MILL. PASSED PRESSURE TEST TO 1500 PSI. WELL IS FREEZE PROTECTED, READY FOR S/L. 6/8/10 PERFORM NO FLOW TEST, NO PRESSURE INCREASE/NO RETURNS. TAG STA.#11 AT 8523' SLM (8544' RKB) 21' CORRECTION. DRIFT TBG W/ DMY WHIPSTOCK DRIFT, TAG @ 8584' CORR RKB, UNABLE TO MAKE IT DEEPER. ASSIST CREW IN SETTING BPV. COMPLETE. 6/13/10 Continue to spot and Shim Rig /Test BOPE 6/14/10 Complete Rig, Underream 8320 to 8870, run Dummy whipstock to 8870. Set whipstock 8828.5 TOW=8819 6/15/10 Completed first window mill run 8820 to 88~6_POOH for second string exit BHA. 6/16/10 Completed 2nd mill run to exit casing and into formation to 8840'. RIH with caliper log. • WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. Attn.: Christine Mahnken 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Perforating Record: 1R-06 Run Date: 5/29/2010 June 9, ZO10 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rafael Barreto, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 1R-06 Digital Data in LAS format, Digital Log Image file 50-029-21331-00 P 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Rafael Barreto 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-273-3527 Fax: 907 , ~ $; rafael.bart:e 1 u'fon ~~m Date: ~~~~~ _~ '-°~ ~ ~5-d~( `~ ~ ~ -1 Signed: • WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. Attn.: Christine Mahnken 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Plug Setting Record: 1R-06 Run Date: 5/26/2010 L J May 27, 2010 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of Rafael Barreto, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 1 R-06 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50-029-21331-00 ~~. PLEASE ACKNOWLEDGE RECEII'T BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Rafael Barreto 6900 Arctic Blvd. Anchorage, Alaska 99518 (~~ ~ Office: 907-273-3527 Fax: 907-273-3535 rafael.barreto@halliburton.com .~_ a~ ~ Date: 'ii ~~ ~ fib?`? ~==~~ G V ~ r~ / ~~~c~~- Signed: 'Vi'i -- ~, _~-~ ,j_ PROAcrive DiagNOSriC SERVicES,'IVC. • ~~LL L. 1'R.4/1/~a-IT~~4L To: AOGCC Christine Mahnken 333 West 7th Avenue Suite 100 ~~'" '-~' Anchorage, Alaska 99501 (907] 659-51 D2 ~ .~ _ _ . _ RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Catiper / MTTj The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following ; ProActive Diagnostic Services, fnc. Attn: Robert A. Richey 1 SO West International Airport Road ca ::~ `~f~"~ Suite C ~ ~, ~~~~ ~:;.~' .. r t ~ tt. :::_ ~-~ Anchorage, AK 99518 Fax: (907j 245.8952 1 ~ Caliper Report 2) 4-May-10 & 10-May-10 1 R-06 1 Report / EDE 50-029-21331-00 C~ ~C r ~ 5 ~~~ ~ ~~~.-o~- Signed : - Date Print Name: PROACTIVE DIAGNO9TiG SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCNORAGE, AK 99518 PHONE: (907}245-8951 FAx: (907}245-88952 E-MAIL : ~s~saa~~~€ssagQC~s?~~s~r_,r, ,a~,~~. r~~ WEBSITE : trr+rv~,v.~es~®~ I~~.s;~^n C:11)ocuments and Settings\Diane Williazns\Deskiop\Ttansmik_Conoco.docx Memory MUIti-Finger Caliper Log Results. Summary Company: ConocoPhillips Alaska, Inc. Well: 1 R-06 Log Date: May 4, 2010 ~ May 10, 2010 Field: Kuparuk Log No.: 7404 8 10631 State: Alaska Run No.: 1 API No.: 50-029-21331-00 Pipet Desc.: 3.5" 9.3 Ib. J-55 EUE 8RD Top Log Intvl1.: Surface Pipet Use: Tubing Bot. Log Intvl1.: 8,932 Ft. (MD) Inspection Type : UPDATED Corrosive & Mechanical Damage Inspection COMMENTS : This caliper data is tied into the tubing tail @ 8,932' (Driller's Depth). This report is a combination of two caliper logs run May 4"' (surface - 8,793') and May 10°i (8,000' - 8,932'). These Togs were run to assess the condition of the tubing with respect to corrosive and mechanical damage. The caliper recordings indicate the 3.5" tubing appears to be in good to poor condition, with a maximum recorded wall penetration of 61 % in pup joint 276.1 (8,762'). Recorded damage appears as isolated pitting. No significant areas of cross-sectional wall toss are recorded. While the May 4ih caliper recordings indicate deposits from _8,765' to -8,780', no significant I.D. restrictions are recorded throughout this interval or the remainder of the well logged in the May 10"' log. No significant I.D. restrictions are recorded. MAXIMUM RECORDED WALL PENETRATIONS : Isolated Pitting { 61%) Jt. 276.1 @ 8,762 Ft. (MD) Isolated Pitting { 39%) Jt. 87 @ 2,709 Ft. (MD) Isolated Pitting { 34%) Jt. 94 @ 2,934 Ft. (MD) Corrosion (30%) Jt. 278 @ 8,816 Ft. (MD) Isolated Pitting (25%) Jt. 277 @ 8,787 Ft. (MD) MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS No significant areas of cross-sectional wall loss (> 9%) are recorded. MAXIMUM RECORDED ID RESTRICTIONS No significant I.D. restrictions are recorded. ~~ Field Engineer: Wm. McCrossan & G. Etherton Analyst: C. Lucasan & M. Lawrence Witness: C. Fitzpatrick & P. VanCamp ProActive Diagnostic Services, Inc. J P.O. Box 1369, Stafford, TX 77497 Phone: (281} or (888} 565-9085 Fax: (281} 565-1369 E-mail: FDS~mmemorylog.com Prudhoe Bay Field Office Phone: (907} 659-2307 Fax: (907} 659-2314 ~=c i~5 -o~-l l~~a~ • Correlation of Recorded Damage to Borehole Profile Pipe 1 3.5 in (-5.5' - 8932.3') Well: 1 R-06 Field: Kuparuk Company: ConocoPhillips Alaska, Inc. Country: USA Survey Date: May 4, 2010 May 13, 2010 . Approx. Tool Deviation ^ Approx. Borehole Profile 1 -1 25 ~:, ~ 757 ; 50 •" 1541 ~ GLM 1 75 2335 100 3120 125 3900 GLM 2 150 4685 ~ GLM 3 v 175 5462 E GLM 4 ~ 6247 ~ j c ~ GLM 5 ~ C GLM 6 225 7043 GLM 7 250 7841 G L M 8 ~ ~ t ~~K~1 1~ 275 8696 GLM 12 280.y 8932 0 50 100 Damage Profile (% wall) /Tool Deviation (degrees) Bottom of Survey = 280.9 • • PDS Report Overview __ ~..,. Body Region Analysis Well: 1 R-06 Survey Date: May 4, 2010 & May 13, 2010 Field: Kuparuk Tool Type: UW MFC 24 No. 218527 / 218183 Company: ConocoPhillips Alaska, Inc. Tool Size: 1.69 Country: USA No. of Fingers: 24 Analyst: C Lucasan & M. Lawrence Tubing: Nom.OD Weight Grade & Thread Nom.ID Nom. Upset Upper len. Lower len. 3.5 ins 9.3 f -55 EUE SRD 2.992 ins 3.5 ins 6.0 ins 6.0 ins Penetration and Metal Loss (% wall) penetration body metal loss body 250 200 150 100 50 0 0 to 1 to 10 to 20 to 40 to over 1 °i° 10% 20% 40% 85% 85% Number of'oints anal sed total = 288 pene. 3 210 67 7 1 0 loss 243 45 0 0 0 0 Damage Configuration (body ) 30 20 10 0 isolated general line ring hole /puss pitting corrosion corrosion corrosion ible hole Number of'oints dama ed total = 28 27 1 0 0 0 Damage Profile (% wall) penetration body _ metal loss body 0 50 100 n GLM 1 GI.M 2 GLM 3 GLM 4 GLM 5 GLM 6 GLM 7 GLM 8 GLM 11 GLM 12 Bottom of Survey = 280.9 Analysis Overview page 2 PDS REPORT JOINT TABI, Pipe: 3.5 in 9.3 ppf J-55 EUE 8RD Well: Body Wall: 0.254 in Field: Upset Wall: 0.254 in Company: Nominal I.D.: 2.992 in Country: Survey Date: ELATION SHEET 1R-06 Kuparuk ConocoPhillips Alaska, Inc USA May 4, 2010 May 13, 2010 Joint No. Jt. Depth (Ft.) Pen. t 1Pt<°( tlns.) Pen. Body (Ins.) Pen. Rio Mc~(,~I I oss `;4~ Min. LD• (Ins.) Comments Damage Profile (% wall) 0 50 100 .1 -6 0.01 2 U 2.96 PUP 1 -1 t~ 0.01 5 (1 2.92 2 34 ~) 0.01 _' 1 2.94 3 65 ? 0.01 Z u 2.95 4 97 z ~ 0.02 t3 2.94 5 130 ~. ~ 0.01 5 1 2.95 6 161 i) 0.02 7 1 2.94 7 193 (> 0.01 ? 1 2.90 8 225 O 0.02 d 0 2.94 9 256 t) 0.02 8 U 2.93 10 288 it 0.02 8 ll 2.93 11 319 t ~ 0.01 4 1 2.91 12 351 (~ 0.01 4 1 2.90 ~ 13 383 i) 0.01 5 (~ 2.94 14 414 ~~ 0.01 5 t) 2.89 15 446 t) 0.01 6 U 2.90 16 477 U 0.01 2 i) 2.87 17 507 U 0.01 ~ l) 2.87 18 537 U 0.01 :' 1 2.90 19 569 i) 0.02 Y 2.95 20 600 O 0.01 ~ (1 2.94 21 634 0.01 3 I 2.90 22 665 U 0.03 11 1 2.94 23 695 t) 0.01 4 t) 2.88 24 726 !) 0.01 ~' 2 2.90 ~ 25 757 0.01 5 U 2.87 26 787 i? 0.01 4 ~~ 2.96 27 819 U 0.03 1O (i 2.90 Lt. De osits. 28 850 t) 0.01 3 t) 2.89 29 882 a 0.01 2 U 2.89 30 913 U 0.01 5 I 2.94 31 943 O 0.03 11 l) 2.95 32 975 ~> 0.01 5 l~ 2.90 33 1006 U 0.01 Z O 2.94 34 1038 t~ 0.01 5 t~ 2.93 35 1070 (~ 0.01 4 1 2.96 36 1102 U 0.01 4 O 2.94 37 1133 U 0.01 5 2.95 38 1165 t~ 0.01 t~ I 2.94 39 1197 ti 0.01 4 O 2.93 "'~ 40 1229 (? 0.01 +? 2.90 41 1260 t' 0.04 l~'; 2.90 Shallow ittin . 42 1292 ~) 0.01 6 ~~ 2.93 43 1324 U 0.03 11 ~ ~ 2.91 44 1355 t) 0.01 4 1 2.93 45 1387 i~ 0.01 4 ? .97 46 1418 +? 0.01 2 I 2.96 47 1450 t? 0.02 9 ,' 2.89 48 1481 (? 0.01 `i 2 2.95 "~ 49 1511 !) 0.06 24 1 2.93 Isolated ittin . _ Penetration Body lvletal Loss Body Page 1 • PDS REPORT JOINT TABS Pipe: 3.5 in 9.3 ppf J-55 EUE 8RD Well: Body Wall: 0.254 in Field: Upset Wall: 0.254 in Company: Nominal I.D.: 2.992 in Country: Survey Date: s ELATION SHEET 1R-06 Kuparuk Conoco Phillips Alaska, Inc. USA May 4, 2010 May 13, 2010 Joint No. Jt. Depth (Ft.) I'~~n. UI»et (Ins.) Pen. Body (Ins.) Nen. °i~, ~~~t,rl I o, °-~> Min. LD• (Ins.) Comments Damage Profile (%wall) 0 50 100 50 1541 U 0.01 S U 2.94 51 1573 U 0.04 17 U 2.91 Shallow ittin 52 1605 a 0.03 11 I 2.92 53 1636 i) 0.01 ~~ (! 2.93 54 1668 ~~ 0.02 ~? c! 2.93 55 1698 U 0.02 9 1 2.93 56 1726 U 0.03 13 l) 2.90 Shallow ittin . 57 1755 t~ 0.02 ti Z 2.88 58 1787 i) 0.02 ~) I 2.89 59 1817 t) 0.06 lS 1 2.90 Isolated ittin . 60 1849 t) 0.04 14 _' 2.93 Shallow ittin . 60.1 1881 U 0 O i t 2.81 Camco IRDP-l A SSSV 61 1893 U 0.01 ? _' 2.88 62 1924 U 0.02 t~ ~ 2.89 63 1954 U 0.01 ~ u 2.89 64 1986 l) 0.01 Z I 2.91 64.1 2016 t) 0 U ~~ N A GLM 1 Latch @ 9:00 65 2024 U 0.01 =I _' 2.93 Pittin . 66 2053 U 0.03 C3 U 2.94 Shallow ittin . 67 2085 U 0.01 2 I 2.94 68 2116 U 0.01 2 2 2.94 69 2148 l) 0.01 4 2 2.93 70 2180 l) 0.03 13 l1 2.93 Shallow ittin . 71 2209 t~ 0.03 1 "? ~' 2.93 72 2242 tl 0.02 ~3 ~' 2.95 73 2273 t) 0.02 f3 O 2.94 74 2305 t I 0.01 i ~ 2.92 75 2335 U 0.01 ? ~~ 2.93 76 2367 t~ 0.04 17 I 2.92 Shallow ittin . 77 2397 0 0.01 _' 2.96 Pittin . 78 2429 l) 0.01 -t _' 2.94 79 2458 i).07 0.02 7 t) 2.91 Pittin in u set. 80 490 U 0.02 ~! I 2.95 81 2520 U 0.02 - t7 2.94 Pittin . 82 2552 n 0.03 ! 1 I 2.92 83 2 584 U 0.03 11 I 2.93 84 2616 U 0.03 11 i 2.94 85 2 648 ~) 0.03 I 0 t) 2.92 86 2677 0 0.02 9 1 2.95 87 2708 (~.(~, 0.10 39 2 2.94 Isolated ittin . 88 2 741 t ~ 0.01 4 2 2.93 89 2772 (~ 0.01 z 1 2.92 90 2804 n 0.01 ? 1 2.96 91 2836 t ~ 0.01 4 l? 2.91 92 2868 ! ~ 0.01 2 I 2.95 93 2898 ~ i 0.01 -~ I 2.96 94 2930 ! ~ 0.09 ;4 I 2.88 Isolated ittin . 95 2961 ~ ? 0.01 4 I 2.95 96 2993 t ~ 0.03 12 t) 2.88 97 302 5 t) 0.01 5 Z 2.96 _ Penetration Body Metal Loss Body Page 2 • PDS REPORT JOINT TABI. Pipe: 3.5 in 9.3 ppf J-55 EUE 8RD Well: Body Wall: 0.254 in Field: Upset Wall: 0.254 in Company: Nominal LD.: 2.992 in Country: Survey Date: iLATION SHEET 1R-06 Kuparuk ConocoPhillips Alaska, Inc. USA May 4, 2010 May 13, 2010 Joint No. Jl. Depth (Ft.) t'c•n. Ul~se~f (Ins.) Pen. Body (Ins.) Pen. % Metal Loss % Min. LD• (Ins.) Comments Damage Profile (%wall) 0 50 100 98 3057 U 0.05 20 ? 2.93 Shallow ittin . 99 3089 U 0.02 9 2 2.95 100 3120 U 0.03 12 1 2.92 101 3152 t i 0.03 1 1 1 2.93 102 3184 ~) 0.01 i [> 2.94 103 3212 U 0.00 I i 2.94 104 3244 t! 0.02 ~~ 2.95 105 3276 i) 0.01 ~' 2.96 ' 106 3308 ,) 0.01 _' 1 2.94 107 3337 0 0.02 ~) ~~ 2.96 i 108 3366 l) 0.04 14 U 2.88 Shallow ittin . 109 3397 l) 0.01 5 ~' 2.97 110 3429 O 0.03 10 I 2.96 111 3461 i) 0.03 1 3 2.87 Shallow ittin . 112 3493 i) 0.01 5 2.93 113 352 5 U 0.02 " ~ i 2.88 114 3556 U 0.01 Z ~ 2.95 1 115 3588 i? 0.01 2 ~ i 2.94 116 3619 i) 0.03 1U ~~ 2.91 117 3650 ~) 0.02 t, r ~ 2.94 118 3681 (> 0.03 11 ~ 2.90 119 3711 n 0.02 ~) ti 2.87 120 3742 O 0.01 2 i) 2.95 121 3774 n 0.03 1~ s, 2.91 122 3805 U 0.03 1 1 i i 2.93 123 3837 ~~ 0.03 I I i! 2.88 Lt De osits. 124 3869 a 0.02 9 ~? 2.88 125 3900 l) 0.03 12 i) 2.89 126 3932 t) 0.01 ? i1 2.93 127 3963 ~) 0.03 11 U 2.85 128 3994 O 0.03 13 ri 2.88 Shallow ittin . 129 4027 t) 0.02 7 u 2.93 130 4058 U 0.02 ~) U 2.93 131 4090 ti 0.02 ~) r) 2.89 132 4121 O 0.02 ~! i) 2.91 133 4152 I) 0.01 .' ~i 2.90 134 4182 U 0.01 -1 ~ ? 2.90 135 4214 a 0.03 1 t) 2.87 136 4246 U 0.03 II i) 2.86 137 4277 t) 0.04 I ~ 1 2.92 Shallow ittin . 137.1 4308 U 0 t) i) N A GLM 2 Latch ~ 10:00 138 4315 f) 0.02 7 i) 2.91 139 4347 0 0.03 13 O 2.88 Shallow ittin . Lt. De osits. 140 4379 U 0.01 5 I 2.93 141 4407 r) 0.02 ~i I 2.92 142 4436 r) 0.02 ~) ri 2.89 143 4468 !? 0.02 ~) I 2.90 144 4500 i 7 0.02 ') i) 2.90 145 4533 a 0.03 I t U 2.91 146 4564 ~) 0.02 ~3 1 2.92 Penetration Body Metal Loss Body Page 3 • PDS REPORT JOINT TABI. Pipe: 3.5 in 9.3 ppf J-55 EUE 8RD Well: Body Wall: 0.254 in Field: Upset Wall: 0.254 in Company: Nominal I.D.: 2.992 in Country: Survey Date: • ~EATION SHEET 1R-06 Kuparuk ConocoPhillips Alaska, Inc. USA May 4, 2010 May 13, 2010 Joins No. Jt. Depth (Ft) fern. Ut~SC~t (Ins.) Pen. Body (Ins.) F'~ n. % Metal I oss °r~~ Min. LD• (Ins.} Comments Damage Profile (%wall) 0 50 100 147 4593 (! 0.03 1 1 t ! 2.91 148 462 5 t ! 0.03 1 ~' 1 2.92 149 4655 a 0.02 t! n 2.88 150 4685 t! 0.03 I I ~' 2.91 ~ ~ 151 4714 t) 0.02 i! 2.90 ~ 152 4746 l) 0.01 4 ! 2.92 r~ 153 4777 U 0.00 I i! 2.90 154 4809 U 0.02 ~> +) 2.90 155 4842 t) 0.01 4 1 2.87 ~~' 156 4873 U 0.02 i) t) 2.89 157 4905 t~ 0.03 11 t1 2.86 158 4937 U 0.02 9 +~ 2.90 159 4967 t! 0.03 I ~ ~ 2.90 160 4999 t ! 0.03 1:_' + i 2.88 161 5030 i! 0.01 ? !~ 2.90 162 5062 i! 0.01 ~ ~! 291 163 5092 i) 0.03 1 U t ! 2.92 164 5124 a 0.02 ~~ t! 2.91 165 5156 i) 0.02 ~> ? 2.94 166 5188 U 0.03 ll) U 2.88 167 5218 t! 0.02 t3 1 2.91 168 5248 t! 0.02 ~> 1 .93 169 5278 U 0.02 9 U 2.91 170 5308 (1 0.03 11 1 2.89 171 5337 t) 0.02 £~ ~! 29D 172 5367 t1 0.01 2 (! 2.90 173 5400 ~! 0.01 5 I 2.93 174 5430 (1 0,01 5 I 2.94 175 5462 t!.O- 0.01 4 t? 2.91 Pittin in u set. 176 5494 (! 0.02 8 i! 2.90 177 5524 n 0.02 ~) + ~ 2.90 178 5555 t! 0.01 ~ t! 2.93 179 5586 t! 0.02 ~) -1 2.93 179.1 5616 t? 0 !! t! N A GLM 3 Latch @ 9:30 180 5624 U 0.02 ~) ~! 2.93 181 5655 r! 0.03 11 ~ 2.86 182 5687 U 0.03 11 a 2.86 183 5719 U 0.01 5 t1 2.91 184 5748 a 0.03 1 3 t! 2.89 Shallow ittin . 185 5781 t) 0.02 ~) t) 2.91 186 5812 U 0.03 1 U U 2.85 Lt. De osits. 187 5844 0 0.02 9 U 2.85 188 5875 t! 0.02 t3 0 2.90 189 5906 U 0.01 2 0 2.92 190 5937 t! 0.03 12 t! 2.89 191 5969 U 0.01 5 !! 2.89 192 5997 t! 0.01 ' l! 2.91 193 6029 t) 0.01 4 (! 2.88 194 6060 t! 0.01 4 i1 2.87 195 6091 t ! 0.02 7 1 2.93 Penetration Body Metal Loss Body Page 4 • PDS REPORT JOINT TABI. Pipe: 3.5 in 9.3 ppf J-55 EUE 8RD Well: Body Wall: 0.254 in Field: Upset Wall: 0.254 in Company: Nominal I.D.: 2.992 in Country: Survey Date: ELATION SHEET 1 K-06 Kuparuk ConocoPhillips Alaska, Inc. USA May 4, 2010 May 13, 2010 Joint No. Jt. Depth (Ft.) !'Ern. t ll,~c t (Ins.j Pen. Body (Ins.) Pen. % ~tct.,l I c,sc `%~~ Min. LD• (Ins.) Comments Damage Profile (% wall) 0 50 100 196 6123 t? 0.02 ~? l? 2.93 197 6155 (? 0.01 b t? 2.92 198 6187 U 0.02 ~1 U 2.90 199 6216 t ~ 0.01 i ! 2.92 200 6247 !) 0.01 ' 2.92 200.1 6280 (? 0 t; t! N A GLM 4 Latch @ 2:30 201 6286 i? 0.03 II i? 2.93 ~ 202 6318 (i 0.0.2 h u 2.91 203 6350 U 0.01 4 i ~ 2.90 204 6379 !? 0.01 4 1 2.92 205 6411 ~:? 0.03 1 ~ (? 2.91 206 6444 t i 0.02 '~ U 2.92 207 6474 (? 0.02 9 (? 2.90 208 6505 U 0.00 1 (? 2.91 209 6538 U 0.02 ~? ~? 2.92 210 6569 11 0.03 l:? ~,? 2.89 Shallow ittin . 211 6601 t ? 0.01 Z i :~ 2.92 212 6633 U 0.01 -l ~~ 2.87 213 6664 (? 0.02 ~) t! 2.88 214 6694 t? 0.03 1 Z t? 2.89 215 6725 tt 0.01 2 u 2.90 215.1 6756 U 0 0 (? N' A GLM 5 Latch ~ 12:00 216 6764 t? 0.02 r, 1 2.92 217 6796 (? 0.03 t (? 2.91 Shallow ittin . 218 6828 (? 0. 3 1 U 1 2.92 219 6860 i ? 0.02 ~) ' ? 2.90 220 6890 U 0.02 £9 t ~ 2.89 221 6919 U 0.03 12 ~? 2.92 222 6951 ! ~ 0.01 ~ i ~ 2.92 223 6980 !? 0.03 1 ~ I 2.92 Shallow itfin . 224 7012 a 0.02 ~) !? 2.91 225 7043 !? 0.03 11 a 2.90 226 7071 t) 0.01 2 !~ 2.91 227 7101 t? 0.03 11 (? 2.91 228 7134 t~ 0.01 5 !? 2.92 229 7162 a 0.03 11 a 2.88 229.1 7194 tl 0 0 ~) N A GLM 6 Latch ~ 3:30 230 7202 (? 0.01 -4 !.! 2.92 231 7233 (~ 0.02 ti ti 2.89 232 7264 (> 0.01 ~1 ~, 2.87 t 233 7295 (? 0.02 I 2.93 234 7327 (1 0.03 12 i? 2.90 235 7359 0 0.01 5 I 2.93 236 7390 U 0.03 12 t) 2.89 237 7421 (? 0.01 5 (? 2.92 238 7453 O 0.03 1 U t? 2.92 239 7484 (? 0.02 ~? I 2.91 240 7516 ;? 0.01 6 U 2.90 241 7548 (? 0.03 1 ~) (? 2.90 242 7579 U 0.02 ~) (1 2.89 _ Penetration Body Metal Loss Body Page 5 • • PDS REPORT JOINT TABULATION SHEET Pipe: 3.5 in 9.3 ppf J-55 EUE 8RD Well: 1 R-06 Body Wall: 0.254 in Field: Kuparuk Upset Wall: 0.254 in Company: ConocoPhillips Alaska, Inc. Nominal I.D.: 2.992 in Country: USA Survey Date: May 4, 2010 May 13, 2010 Joint No. Jt. Depth (Ft.) Pen. Ulsc~! (Ins.) Pen. Body (Ins.) Pen. % McG~I Loss `;~~~ Min. LD• (Ins.) Comments Damage Profile (%wall) 0 50 100 242.1 7611 t) 0 0 (~ N A GLM 7 Latch @ 5:00 243 7618 U 0.02 9 1 2.90 244 7650 (~ 0.02 8 U 2.90 245 7682 U 0.01 5 (~ 2.90 246 7713 !~ 0.02 ~) !~ 2.90 247 7745 (l 0.03 i 1 ~ 2.93 248 7777 t) 0.01 4 U 2.89 249 7809 t) 0.02 <~ U 2.92 250 7841 t) 0.03 .1 U 2.89 251 7871 1) 0.03 ll1 U 2.89 252 7903 a 0.03 11 I 2.90 253 7932 U 0.03 1 Z i 2.90 Shallow ittin . 254 7964 !t 0.02 ~~ I 2.92 255 7995 ~~ 0.02 ti a 2.92 256 8027 U 0.04 15 1 2.91 Shallow ~ittin . 256.1 8058 !) 0 0 !~ N A GLM 8 Latch C 6:30 257 8065 U 0.02 9 I 2.89 258 8097 a 0.02 ~3 U 2.89 I_t. De osits. 259 8129 !1 0.02 ~) !1 2.89 260 8161 !? 0.01 5 I 2.90 261 8192 ! ~ 0.02 r3 ! 1 2.90 262 8225 U 0.01 i ~' 2.94 263 8256 a 0.02 9 I 2.92 264 8288 t) 0.03 11 U 2.92 265 8319 O 0.03 1 1 1 2.90 Lt De osits. 266 8348 !~ 0.02 ~ i? 2.87 266.1 8380 U 0 ! ~ t'+ N A GLM 9 Latch @ 9:30 267 838$ (~ 0.04 15 !~ 2.86 Shallow ittin . 267.1 8419 !) 0 O 3.00 Baker PBR 267.2 8433 U 0 U ~~ 3.00 Baker'FHL' PACKER 268 8440 U 0.03 11 !? 2.91 268.1 8470 U 0 U t~ N A GLM 10 Latch @ 12:30 269 8480 l i 0.01 ~ ! i 2.89 270 8511 U 0.02 ~> U 2.90 270.1 8544 !~ 0 U 1) N A GLM 1 1 Latch @ 2:00 2 71 8551 U 0.01 4 U 2.90 2 72 8583 U 0.01 4 ! ! 2.92 272.1 8612 U 0.03 11 -1 2.93 PUP 272.2 8618 U 0.03 11 1 2.95 PUP 273 8633 O 0.02 B ! i 2.86 274 8664 (~ 0.02 ti 2.91 275 8696 !~ 0.02 2.91 276 8727 !? 0.03 _' !? 2.88 276.1 8756 (? 0.16 (> I ~' 2.93 PUP Isolated ittin . 277 8766 U 0.06 25 1 2.92 Isolated ittin . 278 8798 t~ 0.08 3U 1 2.88 Corrosion. 279 8829 U 0.01 Ei 0 2.91 280 8860 !i 0.06 22 9 2.99 Steel Blast oint. Isolated ittin . 280.1 8881 !? 0.02 t3 ~ 2.88 PUP 280.2 8888 !! 0 !) t) N A GI_M 12 Latch @ 3:00 _ Penetration Body Metal Loss Body Page 6 • PDS REPORT JOINT TABI. Pipe: 3.5 in 9.3 ppf J-55 EUE 8RD Well: Body Wall: 0.254 in Field: Upset Wall: 0.254 in Company: Nominal LD.: 2.992 in Country: Survey Date: iLATION SHEET 1R-06 Kuparuk ConocoPhillips Alaska, Inc. USA May 4, 2010 May 13, 2010 Joint No. Jt. Depth (Ft.) I'c~n. lJl~set (InsJ Pen. Body (Ins.) Pen. °i~, Met~~l Loss °~~~ Min. LD• (Ins.) Comments Damage Profile (%wall) 0 50 100 280.3 8897 t) 0.02 ~> _' 2.96 PUP 280.4 8907 u 0 t) i! 2.96 Baker Seal Locator w 5' of Seals 'FB-1' Packer 280.5 8916 n 0.02 ~! ~! 2.93 PUP 280.6 8921 0 ii 2.75 D Ni le 280.7 8924 i; 0.01 ~i 2.95 PUP 280.8 8930 !! 0 U !! N A Shear Out Sub 280.9 8932 ~? 0 (? ~! N A Tubin Tail _ Penetration Body Metal Loss Body Page 7 ~ ~ ~ ~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ PDS Report Cross Sections Well: 1 R-06 Survey Date: May 4, 2010 Field: Kuparuk Tool Type: UW MFC 24 No. 218527 Company: Conoco Phillips Alaska, Inc. Tool Size: 1.69 Country: USA No. of Fingers: 24 Tubin 3.5 ins 9.3 ~ f J-55 EUE 8RD Anal st: C. Lucasan Cross Section for Joint 276.1 at depth 8762.25 ft Tool speed = 43 Nominal ID = 2.992 Nominal OD = 3.500 Remaining wall area = 97 Tool deviation = 35 ° Finger 16 Penetration = 0.155 ins Pup Isolated pitting 0.16 ins = 61 % Wall Penetration HIGH SIDE = UP • Cross Sections page 1 PDS Report Cross Sections Well: 1 R-06 Survey Date: May 4, 2010 Field: Kuparuk Tool Type: UW MFC 24 No. 218527 Company: Conoco Phillips Alaska, Inc. Tool Size: 1.b9 Country: USA No. of Fingers: 24 Tubin 3.5 ins 9.3 f J-55 EUE 8RD Anal st: C. Lucasan Cross Section for Joint 87 at depth 2709.31 ft Tool speed = 43 Nominal ID = 2.992 Upset OD = 3.500 Remaining wall area = 98 In upset region Tool deviation = 60 ° Finger 18 Penetration = 0.099 ins Isolated pitting 0.10 ins = 39% Wall Penetration HIGH SIDE = UP u • Cross Sections page 2 ~\~ KUP ~ 1R-06 ConoeoPhillip s 1 II At tributes An le 8 111 TD WNlbare A RNWI Fldd Name Well Status Ind l°) ND I~B) Act Bhn (f tl(B) AL,v..,. 'n l l 500292133100 KUPARUK RIVER UNIT INJ 60.30 3.100.00 9,303.0 Comment N2S Ippm) Date Amotadon Entl Dle KB-Grd Q[) Rig elea se ale SSSV: TRDP Last WO: 37.61 5/15/1 985 ell Conh -1 -O6 4/2 7/'0`. '. " ch matic- Aa~,a! Attnotatlon Dep th lNB) Fnd Dale Amotatlon Las/ Mod ey End Date Last Tag' SLM 8.986.0 4/22/2010 Rev Reason: Tag, Pull PluglGauges/Leak Imosbor 4/27/2010 - Casin Strin s CONDUCTOR, tt0 Casing D escriplion String O Iln) D String ID Iln) Top (Rtcel Set Depth I~BI Set Depth (ND) I~BI String Wf Pbsnq Strin Q'ad g e String TO p Thrtl CONDUC TOR 1 6 15.062 0.0 110.0 110.0 65.00 H-40 WELDED sAFErr vlv, w SURFACE 95/ 8 8 765 0 0 4 659 0 3 693 3 36 00 J-55 t.sos . . , . . . . PRODUCTION 7 6.151 0.0 9.278.0 6.974.8 26.00 1-55 GASL~F, Tubin Strin s 041 2 String W String W Set Depth Set Depth (TW) string W[ Strin g , TuW Desai on Pnl M) 7o a ItlKBI ItiKBI (IbsI1Q Grad e S< T 7hM TUBING 3 1 /2 2.992 0.0 8,932.0 6,662.6 9.30 J-55 EUE 8RD GASa s Other I n Hole A ll Jewe l .Tubin Run 8 Retrievable Fish etc. Top Depth (ND) Top lnd suRF46 e 70 8 I~BI (°) Desai 'on Comment Run Date ID n 1.908 1,860.2 29.48 S AFEfV VLV Camco TRDP-1 A' (NOT Locked Out) May hang up 5/21/1995 2.812 c v^ L IFr, toolstring if control line pressure bleeds down. 5631 2,041 1,963.4 33.00 G AS LIFT CAMCO/KBUG/1/DMY/BK///Comment STA 1 11/9/1987 2.875 4,326 3,449.4 43.26 G AS LIFT CAMCO/KBUGl1/DMY/BK///Comment: STA2 11/10/1987 2.875 Gns uFT 6 285 5,631 4,355.8 49.37 G AS LIFT CAMCO/KBUG/1/DMY/BWU Comment: STA 3 11/10/1987 2.875 6.285 4,787.5 48.27 G AS LIFT CAMCO/KBUG/1/DMY/BK///Comment: STA5 6/30/1985 2.875 GAS LIFT, 6.762 5.103.8 48.32 G AS LIFT CAMCO/KBUG/1/DMY/BK///Comment: STA5 11/10/1987 2.875 s ~s2 7,198 5,396.3 47.03 G AS LIFT CAMCO/KBUG/t/DMY/BKI// Comment: STA 6 6/30/1985 2.875 7,615 5,6836 46.05 G AS LIFT CAMCOlKBU 1/DMY/BK///Comment: 5TA7 11/10/1987 2875 eASLIFT, 7?se 8,061 5,995.8 44.95 G AS LIFT CAMCO/KBUG/1/DMYlBK/!/Comment STA8 11!10/1987 2.875 8,381 6,225.8 42.60 G AS LIFT CAMCO/MMG2/1.5lDMV/RK/!/Comment: STA9 11/10/1987 2.922 8,421 6,255.8 41.30 P BR Baker PBR 6!30/1985 .000 GAS LIFr 7 sts 8,435 6,266.1 41.09 P ACKER Baker'FHL'PACKER 6/30/1985 3.000 8,473 6,294.6 40.50 P RODUCTION CAMCOlMMG-2/1.5/DMVIRK///Comment: STA 10 11!21/1993 2.992 GAS L IFT 8,544 6,349.1 39.40 P RODUCTION CAMCO/MMG-211.5/DMV/RK///Comment: STA 11 11/21/1993 2.992 , s ost 8,890 6,626.0 33.19 P RODUCTION CAMCOlMMG-2/1.5/DMY/RIV.25//Comment: STA 12 4!21/2002 2.992 8,909 6,643.9 32.57 P ACKER Baker'FB-1' PACKER 6/30/1985 4.000 GAS L IFT. 8,924 6,656.0 31.85 N IPPLE Camco 'D' Nipple NO GO 6/30/1985 2.750 a aat 8.931 6,661.7 31.51 S OS Camco 6/30/1985 2.992 8,932 6.662.6 31.46 T TL 6/30/1985 2.992 145 9 6 852 0 22 94 F ISH 1 1/2" GLV Valve Dropped: Could Stil be in Tubing String 3/15/1986 PaR, 5421 . . . Perfora tions 8 Slots sna PACY,ER.8435 Top ITVD) mte BtmIND) B Dens (sh Top (RKB) etrn INB) ( ) ~ ) Zone Date ... Type ConarleM 8,582 8,588 6,378.5 6,383.1 C-4, 1R-06 6/30/1965 12.0 IPERF 5.5"HJ II Csg Gun;120 deg phase PRODUCTION, $,692 8,742 6,466.0 6,505.0 C-1, UNIT B, 6/30!1985 12.0 IPERF 5.5" HJ II Csg Gun;120 deg phase e pia 1 R-06 8,860 8,867 6,601.4 6.607.1 UNIT B, 1 R-06 6/30/1985 12.0 IPERF 5.5" HJ II Csg Gun;120 deg phase PRODUCTION, s saa 8.976 8,984 6,699.6 6,706.6 A-0, 1R-06 6/30/1985 4.0 IPERF 4" HJ II Csg Gun' 90 deg. ph 8.994 9,024 6,715.3 6,741.2 A-3, 1 R-06 6/30/1985 4.0 IPERF 4" HJ II Csg Gun' 90 deg. Oh 9,028 9.038 6,744.8 6,753.9 A-3, 1R-06 6/30/1985 4.0 IPERF 4" HJ II Csg Gun' 90 deg. ph s.66zPa sss Notes: General 8 Safe Fsd Date Amotatlon _ 4/23/2010 NO TE: Suspect Tubing leak between 8572' 8 8868' IPERF, 8,692 742 IPERF. 8 660-8 86] PRODUCTION B 890 PACKER, 8,909 NIPPLC--,3,924 sos.esxt ~ T7L, 8,932 IPERF, 8,978E,984 IPFRF 3.994-? 024 IPERF 9,028-9 U38 FISH.9146 PRODUCTION, 9 278 TD, 9 303 ~ ~G !TUBING /LINER DES L• ORiLL SITE f ~- '6 ARCQ Alaska, inc. DATE b` 3o-SS Subsidiary of Atl9ntieRichtielCCompany ~ Page ~ of z- pages #lTEMS COMPLETE DISCRIPTION OF EQUIPMENT RUN LENGTH DEPTH L ~~ ~ 0 3, /a' -- a - t' ~ 2 ' " S,PA ELGE l~u. ~/a ` 33 . io' Q S"r° Pu,os uS 60 s 3'~i f' g•3~ ~'SS EGCE 8PD TPA 'T,g /Q~ 70,57 37+ ZO C' D T [~P- SSS1~ 5~ "oD 2 S~z "~ /, OS' 1907t'7'7 s 3' " -7- ~: fps Ado ~- /al, 96 ' 19/~ ~ SS 73~ S 3'~Z~~T6 . S a ~.3i3"OD 2,g7S"2'A ~~7$.S ?0~(, ~D ~'0 M ~Z t t t, t i fj. 59' 3075 9S Z.I~.s 3'/z" its A~o~l~ /2 9$,~ ~ ~33~.53 X1,1 s '/ " -nrr' A~s o~~ 6 .gib 37~'{$ Co LM ~~ r' ~' 6, SS' ASS lZ /s s'/z s ova' a~i~7o c~C ~ << " 6, ss' 676x, t8 Jfs 3'/i ~ ~/E z ~z 7b8.`76 P>r9wrco L~ ~b t- 1 r 6.63' l9$,/S Ce~Fn1CO Ltil ~-` ~ r ~' 6. s9 ~ 6 sa 5` / ./~s 3 /z'' fl"s o E X39, c~z ~,?r.$ ~~Cb CAM ~ ~ << " 6.5~, ' 6 $06'x.8 1 / (~ /lit 'a'' -2 w 6 ~O~PiF ~~ 808 {33$/.Oq /,}~. '/z 7$ i~-l~o1l~ S. 3"oD Z, 29z"=D 3/. 9 8384, ~7 '~~~e " s ZS'~ ~ 3.00 ~ zA) ~3, -7~ ~a ~, r! /3Ax~ie "F,NL" P,~l1 3.00" ~) 6.9b' 3 .$? 4 ~~ ~~~ l'l2''/~'~!v` ~ /2 p ~ ~Iyi~ IC~ ~r/ o ( JT /7+ "J ~r BOTTOM OF TUBING TAIL Remarks ARCO PM 118 OUAIRY LITHO PRINTING -ANCHORAGE __ - ~s ~G /TUBING /LINER DES L• DRILL SITE Jam' ARC©Alaska, Inc. ~ DATE ~o -~s' ` Subsidiary of AtlantkRi¢hlieldCompany Page ~ of ~ pages #ITEMS COMPLETE DISCRIPTION OF EQUIPMENT RUN LENGTH DEPTH C' /.qtr '~/( I ~/2 `~ -2 /~/Z `' 1~ au ~?,~ f3, 09 ~~4/ . 5~ J l" s? . w ~R p~ a ,aa 3 W 6'C' B~XL~ iv ' ~!/° 3'~." 6,0~ ~- i'5', v R) ~l, /6' 8612.6 ~ ~ ~r ,~ ~ 63 ~s' d633.Sr /J , ~ ~ ,~ F~ s P'~ r Bhp F~,r 3a,~ ~ 96, g~ J~ 3't'`7 8 D P ~ FL4/s pM' W 60~ ~i~" 0~9 9S' 87~7~ 2 ~' i K S 3'~2 `r U {~ 10. !0 ` X757. O Jas 3~/L`' ~ ova" 9 ,off' Y17b$,oo 5 T ao as ' X862, o ~~2 ~ p e~..20 ' ~~7~ LA.r ~/Z 1 ~ 2 it~l - 2 / ~ " IJ ~UMr~ ~ ! ~e 4 7 $f3 26 3~~i !0, 08 gS~.33 Lac 'aR u/3 ~- sus c.. /.oo' 8 ~, l o /'' ~fc~E ,BoX ~- 3'/Z ~ ~ R~ ~~~ 0.60' S9/ 3 ~/z '' uP b, 07 ' 1~~ ~ C'~~p ii~,~~ii~j4'~ ~~7S0~~=,a /,~3' 9'Z3,9/ 3 , „ ,OCC P ~ 04 ~ X925; 2~/ P~ e o ,S'~9,2 tic T- su e3. D, 78 3/, 3 3 a76 3 ~ " -~ 2c ~r o~ ~~ ~2 ~ ~ Sg T Z c - j . ~ ~ -- 8S~ 1 S a~~ ks = s3~ / 2 3 - Cis s~z. ~ s ~ ~~~~- g9~ `T _ /1~E7fs /O ~ i~dl ~-~ ~LL 3 ~2 ~~f»Gfy°S' . 3 J SS .20 EZt E- L BOTTOM OF TUBING TAIL Remarks GG i1~lE~SGI.~EJr?E-7VTS 5 ~3DY~ ~E 71-~13tX ~r /19E79s. _ S ARCO PM 118 OUAU7Y L17H0 PRINTING -ANCHORAGE R. SUp@tvlSOf WELL LOG S TRANSM/TTAL PROAcrive DiagNOSric Sertvices, INC. To: AOGCC Christine Mahnken 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 [907) 659-5102 RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907j 245-8952 1) Caliper Report ~ 04May-10 1 R-06 1 Report/ EDE 50-029-21331-00 2) ':~W~,.~1. L. .. -.e.. - ~ ~'; fit'' U1 C ~ VS -~~[ ~~~Co~ _~ I t ..,® r k a `~ '~Ec ~ a, .a `~ 1Yfh01 ,i ~ ~~ I~ Signed : Date ~ cf.9Y..-i' ~ i~.-?:. ....: L ~'.~_ ": Print Name: ^`y..~ PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SURE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-88952 E-MAIL : pdsanchoraae@memoryloa.com WEBSrrE : www.memorvlog.com C:\Documents and Settings\Diane Williams\Desktop\Txansmit_Conoco.docx • Memory MuttrFinger Caliper Latg Results Summary Company: ConocoRhillips Alaska, Inc. Well: 1R-06 Lag Date: May 4, 2010 Field: Kuparuk Log No. ; 7404 State: Alaska Run No.; 1 API No.: 50-029-21331-00 Pipet Desc.: 3.5" 9.3 Ib. J-55 EUE 8RD Top Log Intv11.: Surface Pipet Use: Tubing Bot. Log Intvl1.: 8,793 Ft. (M©} Inspection Type ; Corrosive & Mechanical Damage Inspection ' COMMENTS This caliper data is tied Into the top of GLM 11 ~ 8,544' (Driller's Depth). ' This log was run to assess the condition of the tubing with respect to corrosive and mechanical damage. The caliper recordings indicate the 3.5" tubing logged appears to be in good to poor condition, with a maximum recorded wall penetration of 61% in pup joint 276.1 (8,762'). Recorded damage appears as isolated pitting. No significant areas of cross-sectional wall loss are recorded throughout the tubing logged. ' The caliper recardmgs indicate deposits from 8,765' to8,780', restricting the I.D. to 2.29" at 8,777'. A graph illustrating minimum recorded diameters an a joint-by joint basis is included in this report. MAXIMUM RECORDED WALL PENETRATIONS Isolated Fitting (61%) Jt. 276.1 ~ 8,762 Ft. (MD) Isolated Pitting (39%} Jt. 87 C~ 2,709 Ft. (MD) Isolated Pitting { 34%) Jt. 94 ~ 2,934 Ft. (MD) Isolated Pitting (24%) Jt. 49 @ 1,526 Ft. (MD) Isolated Pitting (23°~) Jt. 59 ~ 1,837 Ft. (MD} MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS No significant areas of cross-sectional wall loss (> 6%) are recorded throughout the tubing logged. MAXIMUM RECORDED ID RESTRICTIONS Deposits Minimum I.D. = 2.29" Jt. 277 C~3 8,777 Ft. (MD) No other significant I.D. restrictions are recorded throughout the tubing logged. Field Engineer: Wm. McCrossan Analyst: C. Lucasan Witness: C, Fitzpatrick ProActive Diagnostic Services, Inc. / P,O. Box, 1369, Stafford, TX 77497 Phone: (281) or (888) 565-9085 Fax: (281) 565-1369 E-mail: PDS@memorylog.com Prudhoe Bay Field Office Phone: (907) 659-2307 t=ax: (907) 659-2314 • Correlation of Recorded Damag Pipe 1 3.5 in (-5.5' - 8792.6') Well: Field: Company: Country: Survey Date: • ;e to Borehole Profile 1R-06 Kuparuk ConocoPhillips Alaska, Inc. USA May 4, 2010 A pprox. T ool De viation ^ A pprox. Borehol e Profil e -1 757 1541 GLM 1 2335 3120 3900 ~ GLM 2 ~ c 4685 n. a~ GLM 3 5462 GLM 4 6247 GLM 5 GLM 6 7043 GLM 7 7841 GLM 8 GLM 9 C~i~ 1.~ 8696 278 8793 0 5 0 1 00 Da mage P rofile (% wall) / Tool D eviatio n (degr ees) Bottom of Survey = 278 1 25 50 75 100 125 v Z 150 c 'o 175 225 250 275 • • ~~ Minimum Diameter Profile Well: 1 R-0E Survey Date: May d, 2010 Field: Kuparuk Tool: UW MFC 24 No. 218527 Company: ConocoPhiltips Alaska, Inc. Tool Sfze: 1.69 inches Country: USA Tubing I.D.: 2.992 inches 1.69 0.1 7 14 Zi 28 35 42 49 56 62 68 75 82 89 96 103 910 117 12d ., 131 E 137 1aa z C 151 •a 158 165 7z 179 185 192 199 205 212 218 225 231 238 244 251 257 264 268 272 277 Minimum Measured Diameters {In.) 1.94 2.19 2.44 2.69 2.94 PDS Report overview 1.___ ~,e. Body Region Analysis Well: 1 R-06 Survey Date: May 4, 2010 Field: Kuparuk Tool Type: UW MFC 24 No. 218527 Company: ConocoPhillips Alaska, Inc. Tool Size: 1.69 Country: USA No. of Fingers: 24 Analyst:___ __ C. Lucasan Tubing: Nom.OD Weight Grade & Thread Nom.ID Nom. Upset Upper (en. Lower len. 3.5 ins 9.3 f •55 EUE SRD 2.992 ins 3.5 ins 6.0 ins 6.0 ins Penetretion and Metal Loss (% wall) ~ penetration body r~ ,- metal loss body 2 50 200 150 100 50 0 0 to 1 to 10 to 20 to 40 to over 1% 10% 20% 40% 85% 85% Number of 'Dints ana sed total = 282 pene. 3 208 66 4 1 0 loss 241 41 0 0 0 0 Damage Configuration (body ) 30 20 10 0 isolated general line ring hole /puss pitting corrosion corrosion corrosion iblehole Number of'oints dama ed total = 25 25 0 0 0 0 Damage Profile (% wall) ~ penetration body -metal loss body 0 50 100 n GLM 1 GLM 2 GLM 3 GLM 4 GLM 5 GLM 6 GLM 7 GLM 8 GLM 11 Bottom of Survey = 2 78 Analysis Overview page 2 • PDS REPORT JOINT TABULATION SHEET Pipe: 3.5 in 9.3 ppf J-55 EUE 8RD Well: 1 R-06 Body Wall: 0.254 in Field: Kuparuk Upset Wall: 0.254 in Company: ConocoPhillips Alaska, Inc. Nominal I.D.: 2.992 in Country: USA Survey Date: May 4, 2010 Joint No. Jt. Depth (Ft.) I'c•n. Ut„et (Ins.) Pen. Body (Ins.) Pen. °4, Metal loss `7~ Min. LD• (Ins.} Comments Damage Profile (%wall) 0 50 100 .1 -6 (t 0.01 2 ~) .96 PUP 1 -1 It 0.01 5 ?t 2.92 2 34 (t 0 01 I 2.94 3 65 U 0.01 ' U 2.95 4 97 U 0.02 t3 2.94 ~ 5 13 U 0.01 5 ( 2.95 6 161 (t 0.02 7 I 2.94 ~' 7 193 tt 0.01 ! 2.90 8 225 a 0.02 £~ (t .94 9 56 U .02 t3 ii 2.93 10 288 U 0.02 t3 i t 2.93 11 319 (1 0.01 d 1 2.91 12 351 a 0.01 4 ~ 2.90 13 383 (? 0.01 5 u 2.94 14 414 +.? 0.01 5 t) 2.89 15 446 U 0.01 t~ a 2.90 16 477 0 0.01 2 ~~ 2.87 17 507 U .O1 (~ i! 2.87 1 537 r) 0.01 2 I 2.90 19 6 i t 0.02 t3 .95 20 600 (? 0.01 5 U 2.94 21 634 c i 0.01 4 1 2.90 22 665 U 0.03 11 2 94 23 695 tt 00 4 (~ 2. 8 24 726 +) 0.01 ~ 2.9 2 757 i t 0.01 5 ? .87 26 787 a 0.01 4 +? 2.96 27 819 O 0.03 1l1 !) 2.90 Lt. De osits. 2 850 ~ t 0.01 (t 2.89 29 882 U 0.01 Z ~) 2.89 30 913 tt 0.01 I 2.94 31 943 (1 0.03 11 (1 2.95 32 97 +t 0. 1 5 i! 2. 0 33 1006 U 0.01 ' i t 2.94 34 1038 !> 0.01 5 + 2.93 35 1070 t? 0.01 4 I 2.96 36 1102 (1 0.01 4 ii 2. 4 37 1133 (t 0.01 5 2.95 38 11 5 n 0.01 6 I 2.94 39 1197 (? 0.01 •~ ~? 2.93 40 1229 ~) 001 ~ ~? 2.90 41 1260 ++ D.04 I i 2.90 Shallow ittin . 4 1292 (? 0. 1 t, ~ + 2.93 43 1324 t t 0.03 1 1 ~) 2.91 44 135 O 0.01 d I 2.93 45 1387 cl 0.01 4 2 2.97 46 1418 c) 0.01 2 I 2.96 47 1450 (t 0.02 9 ~ 2.89 48 14 1 (? 0.01 5 2.95 49 1511 !) 0.06 ~4 1 2.93 Isolated ittin . _ Penetration Body Metal Loss Body Page 1 PDS REPORT JOINT TABI. Pipe: 3.5 in 9.3 ppf )-55 EUE 8RD Well: Body Wall: 0.254 in Field: Upset Wall: 0.254 in Company: Nominal I.D.: 2.992 in Country: Survey Date: • ELATION SHEET 1R-06 Kuparuk ConocoPhillips Alaska, Inc USA May 4, 2010 Joint No. )t. Depth (Ft,) I'e~n. t)l~sc~l (Ins.) Pen. Body (Ins.) Pen. °% :~~•t,~l Loss ",'~~ Min. LD• (Ins.) Comments Damage Profile (%wall) 0 50 100 50 1541 (t 0.01 S tl 2.94 51 1573 l) 0.04 1 i u 2. 1 Shallow itti 52 1 05 U 0. 3 11 I 2.9 53 1636 t? 0.01 4 ~~ .9 54 1668 ! t 0.02 ~~ ~ ~ 2.93 55 1698 a 0.02 ~~ I 2.93 56 1726 l~ 0.03 I , u 2.90 Shallow i in . 57 1755 U 0.0 t3 ? 2.88 5 1787 tl 0.02 ~~ 1 89 18 7 t~ 0.06 2.3 1 2.90 Isola d ittn . 60 1849 i) 0.04 14 Z 2.93 Shallow ittin . 60.1 1881 U 0 0 t) .$1 Camco TRDP-1 A SSSV 61 1893 (~ 0.01 2.88 62 1924 ~ ~ 0.02 t3 2.8 63 1954 U 0.01 ? u 2.89 64 1986 t) 0.01 1 .91 64.1 2016 t~ 0 t) t~ N A GLM 1 Latch ~ 9:00 6S 20 4 t~ 0.01 4 2.93 Pittin . 66 2053 O 0.03 1 "1 c? 2.94 Shallow ittin . 67 2085 t1 0.0 ~' I 2.94 68 2116 0 0.0 2 ? 2.94 69 2148 t ~ 0.01 4 ~' .93 70 2180 tt 0.03 13 U 2.93 Shallo it6n . 71 2209 t~ 0.03 1 ~~ ,' 2 93 72 2242 U 0.02 t? .95 73 273 U 0.02 ti • i 94 74 230 U 0.01 ~' i~ 2.9 75 2335 tt 0.01 2 tt .93 76 2 36 7 l ~ 0.04 1;' I 2.92 Sha low 'tf n 77 2397 (~ 0.01 ~ 2.96 Pittin . 78 2429 t~ 0.01 4 ~ 2.94 79 2458 t~.t)7 0.02 7 i~ 2.91 Pittin in u t. 2490 a 0.0 `) I 2.95 81 2520 (~ 0.02 7 ~ ~ 2.94 Pittin . 8 2552 l) 0.03 1 1 I .9 83 2584 n 0.03 I1 I .93 84 2616 (~ 0.03 11 I 2.94 5 2648 U 0.03 10 l~ 2.92 6 2677 U 0.02 9 I 2.9 87 2708 t~.tt-" 010 ~N Z 2.94 Isol ed i ~n 88 2741 ~ ~ .01 4 ' 2 93 89 2772 ~ ~ 0.01 ~ I 2.92 90 2804 ~' 0.01 I 2.96 91 2836 ~! 0,01 a t~ .91 92 2868 ~ ~ 0.01 Z I 2.95 93 8 U 0 1 I .9 94 2930 U 0.09 ~4 I 2.88 Isolated ittin . 95 961 (~ 0.01 4 I .95 96 2993 tt 0.03 12 ~> 2 88 97 30 5 ~ ~ 0.01 5 .9 _ Penetration Body Metal Loss Body Page 2 • PDS REPORT JOINT TABULATION SHEET Pipe: 3.5 in 9.3 ppf )-55 EUE 8RD Well: 1 R-06 Body WaU: 0.254 in field: Kuparuk Upset Wall: 0.254 in Company: ConocoPhillips Alaska, Inc. Nominal I.D.: 2.992 in Country: USA Survey Date: May 4, 2010 Joint No. )t. Depth (Ft.) N~_,n. UI~sE~I {In,.j Pen. Body (Ins.} f'en. % Metal I <>s: `% Min. LD• (Ins.) Comments Damage Profile {% wall) 0 50 100 98 3057 li .05 21) _' 2. 3 Shall w i tin . 99 308 ~ ~ 0.02 ~) ~' 2. 5 100 31 0 t) 0.03 12 1 2.92 101 3152 t? 0.03 11 1 2.93 0 3184 l) 0.01 5 l? .94 103 3212 U 0. I I 2.94 10 3 44 0 .OZ 4 I 2.95 105 32 76 t ~ 0.01 2 ,' 2.96 10 3 0 I I 0.01 ~ 1 94 107 3337 (~ 0.02 ~ ~ 2.96 108 3366 ~~ 0.04 14 a 2.88 Shallow ittin . 109 3397 U 0.01 5 ? 2.97 110 3429 U 0.03 1O 1 2.96 111 3 1 U 0.0 1 3 _' 2.87 Sh I w 'ttin . 112 3493 n 0.01 5 1 2.93 113 3525 t~ 0.02 9 U 88 114 3 56 ~) 0.01 2.95 115 3588 U 0.0 2 i) 2. 4 116 3619 (~ 0.03 10 i1 2.91 117 36 t ~ 0.02 8 ~ ~ 94 118 3681 U .03 11 4 2.90 119 3711 l~ 0.02 9 t~ 2.87 12D 3742 ~? 0.01 U .95 12l 3774 i) 0.0 12 6 .91 12 805 c~ 0.03 11 ~,I 2.93 1 3 3837 U .0 11 i) ' .88 Lt. e s'ts. 124 3869 ) 0.02 9 ~ ~ 2. 8 125 3900 (~ 0.03 12 E1 ,89 126 39 a 0.01 2 u 2. 127 3963 c? .03 l1 a 2.85 128 3994 l1 .03 13 t1 2.88 allow ittin . 129 4027 U 0.02 7 u 2.93 13 05 U 00 ~~ t~ 3 131 4090 U 0.02 ~) U 2.89 132 4121 t~ 0.02 ~~ i? 2.91 133 4152 ~? .01 ~ U 2.90 134 4182 c ~ 0.01 4 U 2.90 135 4214 (1 0.03 1U (1 2.87 13 4246 a 0.03 11 a 2.86 137 4277 t ~ 0.04 i I 2.9 Sha low ittin . 137.1 430$ U 0 (1 ~ ~ G M Latch ~ 10:00 13$ 4315 ~~ 0.0 7 ~? .91 139 4347 t~ .03 1 3 i1 .88 Sallow ittin Lt. De osits. 140 4379 ~ ~ 0.01 5 i 2.93 141 4407 (~ 0.02 ~~ I 2.92 142 4436 i? 0. 2 9 ~~ .89 143 4468 U 0,02 9 I 2.90 144 4500 i 1 0.0 q 0 .90 145 4533 ~ ~ 0.03 I 1 c I 2.91 146 4564 ~ ~ 0. 2 ~> I 2.92 jPenetration Body Metal Loss Body Page 3 PDS REPORT JOINT TABS Pipe: 3.5 in 9.3 ppf J-55 EUE 8RD Well: Body Wall: 0.254 in Field: Upset Wall: 0.254 in Company: Nominal I.D.: 2.992 in Country: Survey Date: • ELATION SHEET 1R-06 Kuparuk ConocoPhillips Alaska, Inc, usa May 4, 2010 Joint No. Jt. Depth (Ft.) Ncvr. t lln~~t (Ins.) Pen. Body (Ins.) Pen. °k~ Metal I oss °/~ Min. LD• (Ins.) Comments Damage Profile (% wall) 0 50 100 147 4593 t) 0.03 1 1 l1 2 91 148 462 ~.? .03 12 I .92 14 4655 i) 0.0 9 U 2.88 150 4685 ~) 0.03 11 i ~ 2.91 151 4714 U 0. 7 ~ ~ 2.90 15 4746 t) 0.01 4 i 2.92 153 4777 ~) 0.0 1 t) 2.90 154 4809 ~) 0.02 9 l1 90 155 4842 ~) 0.01 4 1 7 156 4873 U 0.02 9 U 2.89 157 4905 i) 0.03 1 1 1 ~ .86 158 493 t~ 0.02 ~) 0 2.90 159 4967 ~! 0.03 12 1 2.90 160 4999 t) 0.03 12 0 2.88 161 5030 ~ ~ 0.01 2 U 2.90 16 5062 I) 0 01 4 ~ ~ 2.91 163 5092 ~ ~ 0.03 1 ~) i! 292 164 5124 !! 0 ~) t, 2.91 165 5156 + ~ 0.02 ~> 2.94 166 5188 t~ 0.03 lU t~ .88 7 521 n 0.02 8 1 2.91 168 5248 t) 0.02 ~) 1 .93 169 5 78 t) 0.02 9 U 2.91 170 5308 t) 0.0 11 1 .89 171 5337 n 0.0 ti U 2.90 172 5367 ~~ 0.01 ? t) .90 173 5400 n 0.01 5 1 2.93 174 5 30 t) 0.01 5 i 2.94 175 546 t).±)' 0,01 4 :) 2.91 Pittin in u set. 176 5494 a 0.02 t3 U 2.90 177 55 4 !) 0.0 9 t) .90 178 5555 a 0.01 ~1 U 2.93 79 5586 U 0.02 ~) a 2. 3 179.1 5616 r> 0 U r) N A CLM 3 Latch ~ 9:30 180 5624 r ~ 0.02 9 i? 2.93 181 5655 ! ~ 0.03 1 I ~ 2.86 18 5687 ~, i 0.03 1 1 ; ~ 2.86 183 5719 ~! 0.01 5 ~) 2.91 184 5748 ~) 0.03 1:3 t) 2.89 Sallow ittin 185 57 1 U 0.02 ~) ;! 291 186 581 Z ~:) 0.03 I U i ? 2.85 L . De osi ts. 187 5844 t i 0.0 4 i I .85 188 5875 0 .02 8 u 2.90 189 5906 l) 0.01 ~ i) 2.9 190 5937 ~! 0.03 12 i ~ 2.89 19 969 !1 001 5 U 9 192 5997 t'• 0.01 Z U 2.91 19 6029 ~) 0.01 4 t) 2.88 194 6060 ! ~ 0.01 4 ~) 2.87 19 6091 ! ~ 0.02 7 I 2.93 _ Penetration Body Metal Loss Body Page 4 • PDS REPORT JOINT TABI. Pipe: 3.5 in 9.3 ppf )-55 EUE 8RD Well: Body Wall: 0.254 in Field: Upset Wall: 0.254 in Company: Nominal I.D.: 2.992 in Country: Survey Date: • ELATION SHEET 1R-06 Kuparuk ConocoPhillips Alaska, Inc. USA May 4, 2010 Joint No. )t. Depth (Ft.) Nen. Upset (Ins.) Pen. Body (Ens.} I'en. % Metal loss ';~, Min. LD• (Ins.) Comments Damage Profile (% wall) 0 50 100 196 6123 t) 0 02 ~) a 2. 3 1 7 6155 (1 001 b U 2.92 1 8 6187 U 0.02 ~~ a 2.90 199 6216 t) 0 01 5 n 2.92 200 6247 U 0.01 ? i i 2.92 200.1 6280 O 0 U i1 N A G M 4 Latch :30 201 6286 U 0.03 ll ii 2.93 02 6318 a 0.02 t3 ! ~ 2.91 03 6350 t? 0.01 d +; 2.90 204 63 9 t) .01 4 I 2.92 205 6411 n 0.03 12 t1 2.91 06 6444 +) 0.02 t) (+ 2.92 207 6474 ii 0.02 9 i~ 2.90 208 650 U 0.00 1 U 2. 1 209 6538 ti 0.02 9 U 2.92 210 6569 tt 0.03 1 3 U 2.89 Shalb 'tin . 211 6601 + i 0.01 t i 2.92 212 6633 U 0.01 ~ u 2.87 213 6664 ~ t 0.02 ~) U .88 214 6694 i 1 0.03 1 ~ 0 .89 215 67 5 ti 0.01 1 U 2.90 15.1 6756 tt 0 U t) A GL 5 Latch 1 0 216 6764 U 0.0 6 I .9 17 6796 !i .03 13 ti 2.91 Shalio ittin . 21 682 +) 0.03 IU i 2.2 219 6860 0.0 ~~ +i 2.90 20 6890 a 0.02 t3 r ~ 2 89 221 6919 i) 0.03 14 + ~ 2.92 22 6.51 ~? 0.01 5 ti 2.92 223 6980 +~ 0.03 13 1 2.92 Shallow it6n . 224 7012 tt 0.02 ~) U .91 225 7043 +~ 0.03 11 U 2.90 2 6 7071 U 0.01 _' U 2.91 227 7101 n 0.03 11 +~ .91 228 7134 (i 0.01 5 ti 2.92 229 716 ii .03 11 ii 2.88 9.1 7194 U 0 l) ! 1 N GI.M 6 Latch ~ 3:3 230 7202 t> 0.01 4 u .92 231 7233 +~ 0.02 £3 U .89 232 72 4 ti 0. 1 4 ~i 2.87 233 295 ! i 0.0 7 1 2.93 234 7327 ii 0.03 11 U 2.90 235 7359 U 0.01 5 I 2.93 236 7390 t1 0.03 1.' .89 237 7421 i i 0.01 5 t i 2.92 2 7453 i i 0.03 1 U U 2.92 239 7484 l i 0.02 9 I 2.91 240 7516 i) 1 G t) 2.90 241 7548 ~~ 0.03 1l) ti 2. 0 242 7579 t i 0.02 ~) i i 2.89 _ Penetration Body Metal Loss Body Page 5 • • PDS REPORT JOINT TABULATION SHEET Pipe: 3.5 in 9.3 ppf J-55 EUE 8RD Well: 1 R-06 Body Wall: 0.254 in Field: Kuparuk Upset Wall: 0.254 in Company: ConocoPhillips Alaska, lnc. Nominal I.D.: 2.992 in Country: USA Survey Date: May 4, 2010 Joint No. Jt. Depth (Ft.) I'~~n. lJpsc~t (Ins.) Pen. Body (Ins.) Pen. % ~~tet.~l Ic~sc °4, Min. LD• (Ins.) Comments Damage Profile (%wall) 0 SO 100 242.1 7611 i? 0 0 t! N A LM 7 a h@ 5:00 243 7618 U 0.02 ') I 2.90 244 7650 t! 0.02 t3 i? 2.90 245 7682 ti 0.01 ~.~ 2.90 246 7713 t) 0.02 '? i! .90 47 7745 U 0.03 I t 2.93 24 7777 U D.O1 ~1 U 2.89 249 7809 a .0 ~> U 2.9 250 7841 i) 0.03 11 t) 2.8 51 7871 n 0.03 10 t) .89 252 7903 i? 0.03 II 1 2.90 253 7932 U 0.03 A 2 1 .90 Sh Ilow ittin . 254 7964 U 0.02 ~? I 2.92 255 7995 U 0.02 8 i) 256 8027 U 0.04 15 1 2.91 Shallow ittin . 256.1 8058 t) U U N A GLM 8 Lac 6: 0 257 8065 l) 0.02 y 1 2.89 258 8097 U 0.02 ~3 U 2. 9 Lt. a sits. 259 81 9 i) 0.02 ~) a 2. 9 60 61 a 0.01 5 2.90 61 8192 t? 0.02 ti i? 2. 0 26 8 25 a 0.01 5 2.94 263 8256 !) 0.0 ~~ I .92 64 8288 t) 0. 3 11 a 2.92 5 831 U 0 3 1 1 1 ' .90 t. De its. 266 8348 U 0.0 7 +! 87 6.1 8 80 U 0 l) U N A G M 9 Latch @ 9:3 267 8388 i t 0.04 1.5 a 2.86 Shallow ittin . 267.1 8419 i ~ 0 l) ~ i 3.00 Bake PBR 267.2 8433 U 0 U ;! 3.00 aker'FHL' PACKER 6 8440 i) 0.03 1 f ~ ! 2.9 26 .1 8470 U 0 1) u N A GLM 10 L tch @ 12:30 269 480 c? 0.01 -4 +? 2.8 270 8511 a 0.02 ~) U 2.90 270.1 544 t) 0 0 t) N A G M 11 atch @ 2:00 271 8551 r? 0.01 4 t~ 2.90 272 8583 U 0.01 4 U .92 272.1 8612 U 0. 3 11 .92 UP 272. 8618 a .02 (~ ~.! .9 PUP 27 8633 0.01 -1 ~ ~ 2.85 74 8664 t! 0.0 (~ t) 2. 2 75 8696 i) 0.0 2.91 27 8727 !! 0.0 I ~ ~? .88 276.1 87 7 U 0.16 61 _' .9 PUP Isolat d iY i 277 8765 U 0.01 5 U 2.29 De osits. 278 8793 i! 0.01 6 O 2.91 _ Penetration Body Metal Loss Body Page 6 - PDS Report dross Sections Well: 1 R-06 Survey Date: May 4, 2010 Field: Kuparuk Tool Type: UW MFC 24 No. 218527 Company: ConocoPhillips Alaska, Inc. Tool Size: 1.69 Country: USA No. of Fingers: 24 Tubin 3.5 ins 9.3 f J-55 EUE SRD Analyst:_ C. Lucasan Cross Section for Joint 276.1 at depth 8762.25 ft Tool speed = 43 Nominal ID = 2.992 Nominal OD = 3.500 Remaining wall area = 97 Tool deviation = 35 ° Finger 1b Penetration = 0.155 ins Pup Isolated pitting 0.16 ins = 61% Wall Penetration HIGH SIDE = UP • • Cross Sections page 1 r ~ r ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~ S PDS Report Cross Sections Well: 1 R-06 Survey Date: May 4, 2010 Field: Kuparuk Tool Type: UW MFC 24 No. 218527 Company: ConocoPhillips Alaska, Inc. Tool Size: 1.69 Country: USA No. of Fingers: 24 Tubin 3.5 ins 9.3 f J-55 EUE 8RD Anal st: C. Lucasan Cross Section for Joint 87 at depth 2709.31 ft Tool speed = 43 Nominal ID = 2.992 Upset OD = 3.500 Remaining wall area = 98 In upset region Tool deviation = 60 ° Finger 18 Penetration = 0.099 ins Isolated pitting 0.10 ins = 39% Wall Penetration HIGH SIDE = UP • i Cross Sections page 2 PDS Report Cross Sections Well: 1 R-06 Survey Date: May 4, 2010 Field: Kuparuk Tool Type: UW MFC 24 No. 218527 Company: ConocoPhillips Alaska, Inc. Tool Size: 1.69 Country: USA No. of Fingers: 24 Tubin 3.5 ins 9.3 f )-55 EUE 8RD Anal st: C. Lucasan Cross Section for Joint 277 at depth 8776.587 ft Tool speed = 44 Nominal ID = 2.992 Nominal OD = 3.500 Remaining wall area = 100 Tool deviation = 33 ° Finger 5 Projection = -0.275 ins Deposits Minimum I.D. = 2.29 ins HIGH 51DE = UP • Cross Sections page 3 ~~ -'~~ KUP 1 R-06 Philli C n ntt-awte~ e ~ ~ Tn ps onoeo WNlbore APINWI eW Name ell Status h (') Act Dtrn (1tl0) "'' I 500292133100 KUPARUK RIVER UNIT INJ 60.30 3,100.00 9,303.0 Cammera H2S Ippm) a[e Amo on Ertl a[e (If) p elease ate - a 1/ 10' 4G °21N1 SSSV: TRDP Last WO: 37.61 5/15/1985 ual on Last Tag: SLM DePtli 8.986 0 ate 4/22n010 on Last Rev Reason: Tag, PuN Plug/Gauges/Leak Imosbor d eh 4n7n010 C i i S corvoucro~ as n tr n s Cagrg Descriptlon Sting O Iln) D Stdng ID Irry Top (NCB Bet Depth ItlKBI t pm ) IttKa 5[ n9 116g1q p'~ Burg Top lied t I o CON OR 1 6 15.062 0.0 110.0 110.0 5.00 H-40 LDED snFErv vlv, j SURFACE 951 8 8 765 0 0 4 659 0 3 693 3 36 00 J•55 1,909 v . . , . , . . PRO UCTION 7 6.151 0.0 9.278.0 6,974.8 26.00 J-55 GA tlFr. Tubin Strin s t O U ~ 6t b ~ ~~ o Oyi Tu Descrl n String O flnl D SMR9ID flnl T Se DeWi IBKBI ep i ( ) ImcB) r ig (lbslq Crad 9 e lbrd TUBING 3 1/ 2 2.992 0.0 8,932.0 6,662.6 9.30 J-55 EUE BRD GA`, "FT A °.16 Other I n Hok All Jewe l . Tubin Run ~ RedteVabie Fish etc. ~ ~ Top kta SURFACE T e 19 Oe n Comment Run Date ID 4,659 1,908 1,850.2 29.48 S AFETY VLV Camoo TRDP-1A' (NOT Locked Out) May hang up 5n111985 2.812 toolstring'rf control fine pressure bleeds down. Guess 2.041 1, 63.4 33.00 G AS LIFT CAMCO/ UGII/DMV/ Kill Cortanent Al ti 1987 2.8 5 4.3 3,419.4 43.2 G AS LI C QI G/1IDMY/BKII/ Conxnent: A 2 11!10/1987 2. 75 cas uFT 6,285 5,631 4,3 5.8 49.37 G AS LI CAMCO/KBUG/t BKll1 Comment: STA 3 11/10/1987 2.875 6,285 4,787.5 48.27 G AS LIFT CAMCO/KB 1lDMYBK//!Comment STA 5 6!30!1985 2.875 6.762 5,103.8 48.32 G AS LI CAMCQ'KBUG/1IDNIY/BKII/Commem: STA 5 111011967 2.575 GAS LIFT, 6.1s2 7,198 .3 47.03 G AS LIFT CAMCO/K911G/1 MYBK///Comment: A6 6/30/ 985 2.8 5 7.615 ,683.6 46.05 G AS LIFT CAMCOIKBUG/t/DMY/BK///Commem: STA7 11/10/1987 2.876 Gas uFr. 8,061 5,995.8 44.9 G AS LI AMCO/KBUG/7!D BKlll Comment STA8 11/10/1987 .875 ? tse 8,381 6, 25.8 42.60 G AS LI CAMCOlMMG-2I1.6/DMYIR //Comment: STA 9 11110/1987 2.922 8,421 6,255.8 41.30 P BR Baker R 6/ 0/1985 3.000 easuFT. J.6IS 8,435 6,266.1 41.09 P AC R Baker'FHL'PACKER 6130!1985 3.000 ,473 6,294.6 40.50 P RO UCTION C O/MMG 1.5/DMV/RK//l Corrwnent: STA 0 ttnl/1993 2.992 8,544 6,349.1 39.40 P RODUCTION CAMCOIMMG-2/1.5lDMV/RKpl Comment STA 11 11n1/1993 2.992 GAS LIFT, s.o61 8,890 6,626. 33.1 P R DUCTION CAMCO/MMG-211.5/DMY/RK/.25ll Commem: A12 amn 2.992 8,909 6.643.9 32.57 P AC R Baker'FB-1' PACKER 8/30/1985 4.000 8. 4 ,656.0 31.85 IPPLE Camco'D' temple NO GO I 985 .750 cAS uFr e,3et 8,931 6,661.7 31.51 S OS Cameo fi/31L1985 2.992 .932 6.662.6 3146 L 6/30/198 2.992 9,145 6,852.0 22.94 F ISH 1 112" GLV Valve Droppetl; Could Sill be in Tubing String 3/1 511 9 8 6 ~ 8d2t Perforations 8 Slots PACKER, B 435 Top (TVD) Btm (ND) Der1t T IBKBI Btm rICB fttKBl (rtK8) Zone Date (sh.. Type Co rranart 8.582 ,588 6,3 8.6 6,383.1 C -0, 1R-06 6/30/1985 12.0 IPERF 5. 'HJII CSg Gu n;120 deg phase PROOUCrroN, 8, 2 8, 42 6,465.0 6, .0 -1, l1NR B, 8/30/1985 12.0 IPERF 5.5" HJ II Csg Gun;120 deg phase eA13 1 R-08 8,880 8,887 6,801.4 6.607.1 U NIT 8. 1 R-O6 6/30/19 5 12.0 IPERF 5.5" HJ II Csg Gu n:120 deg phase PRODUCTION, 8,976 8,984 6,699 6 8,706.6 A -0, 1 R-06 6/30/1985 4.0 1 4" HJ II Csg Gun' 90 deg. ph 9 sea 8,994 9.024 6.715.3 6,741.2 A -3, 1 R-06 6/30/1 5 4.0 IP RF 4" HJ II Csg Gun' 90 deg. ph 9.028 9, 038 6,744.8 6.753.9 A -3. 1 R-06 6/30/1985 4.0 P F 4" HJ II Csg Gun' 90 deg. ph IPERF es92-esae Notes: General D 8 Sate A t tb F1Id ate 4123!2010 NO mo a n T : Suspect Tubing leak between 8572' & 8868' IPERF, 6,6928 742 IPERF, 6,8608,867 PRODUCTION, 6,890 PACKER. 6.909 NIPPLE, 8,926 5115.8 931 TTL. 8,932 IPERF. 8,9168 984 IPERF 8,9845p24 IPERF, 9.028y,038 FISH.9145 PRODUCTION, 9.218 TD. 9 303 +~ ~G !TUBING./ LINER DE7~ L~ DRII_I_ siTE ~~- ~ ARCO Alaska, Inc. DATE ,~-mss Suhsidlaryt of AtbnticRiCh/NldCompsny ~ Page ~ ~ pf _ Z- pag@s ITEMS COMPLETE DISCRIPTION OF EQUIPMENT RUN LENGTH DEPTH L ~K 1~ 4 3.1D' - a - t' ~ ,PAD EGt~' ~/d` 33 ~ l0` s{~ Pups us bo s 3' ~" 4,3'~ ~"ss E'uE 8,~o rPe -~z3 /~ 7o,s7 37r Zo C' D a - SSSt/ S.` `oD ,Siz "te=e /, 08' l~IO X7'7 ~' 3' " -7- t~: il~s Aa~o ~ 1a 96 ` l9/~3 ~ SS 1 N~ l 1 nF UAd L=Z ' ~ .~~ 7~.1 s 3'~2'~ ~:3 i3 "OD Z~ c375" 2'A ,278.5 ~0~(, ~f 0 ~ ~, ~~ , F ~, ~ ~ b, ~`8' 3aS 9S Z fps 3'l ,~ ~i s o~t~ /2 9$. 3 ~33a,~3 co Ltil ~` i' ~' 6, SS' o~BS /Z l s r 3' ot~ a9/~~o ~ c ~ ~~ -~ 6, ss ~ 67da.18 l Jas 3 ~/i s ~Z 768•~f~ Pl1f~Ic ~ ci -~ 663' 1413,15 ! .l~ 'iz ~-s o. 7~ . ~ ~ Coco Lxt ~ cc ~' d , s 6 S, S c~tcb M ~ S ~r a~ $06'n.96 0 ~' 3'~i'' If~OYE . ~' p l.}~. '1 78 A-t3oV~' S; `~ o Z. 2Q ",rD 3/, 9 ~3~`t, / 7 /j~Fi~` MF!/G' Pmt 3.00" ~) 6, 9b ` 3 •8? 3'/a a E" ~/, 6-z ' , ~ 3 C' ~rt~ Rio ~ ~/ „ ya h ~ /~l4o~i ~ ~/~ 8 0 ~4~7~ S~ ~/. BOTTOM OF TUBING TAIL Remarks ARCO PM 118 OUAUri UTHp PRIN77N0 - ANCNORA6E ~G /TUBING / LINER DES` l® GRILL SITE /~~ ~ ARGQ Alaska, fnc. ©ATE 6 X30 --..~s~ Subsidiary of Atl:nikRichflNdCon+paey ~ PagB ~ of ~ QagBs ~fITEMS COMPLETE OISCRiPT10N OF EQUIPMENT RUN LENGTH DEPTH ~ ~ h a ~/~" , vc~ f3 /~ s ~ ~t( I ~/2 ~` _Z i/,~ „ 1~ as P2~ d, 09 ~~ . 5 I Jf : .~~ ~, ~J,Bo' Y~5S2,~6 ~ J . , ., s P- ~ , ~ ~ W 6'P 8~ ,~r ' 3'Z' 6,0~ ~- i~ v Q) ~J, /b' 8612.6 ~, ~ ,. ,~- . 8 v r ' Ft4<s vor r~ bo' ~'~ X9.98 ' 7~?- 2 l~'r s i ~~ 3 2 ~ /0,10 7 o x 3~1L`' av~ 9 ,per f~7:~8,00 s r ao.da i ~~62~ o ~ ~lz ~C A ~..zo ' X37. G!6 LiLI ~1 Z I `~~ - 2 J~ n D t~U,tiyt ,C , 0 7 3/ 10.08 8`~8, 3 3 L -aR Ut3 U 5~ L . J~oO' ~ ~ l ~ „ _ „ P,~,E-. S. 07SvD .~~.z'b 3.30' 89 ~ / 3 ~ x H uP 6, 07 ` t?. ~l ~' " pup ~~ ` 92s C~As~ eo Shy ~r.~ sub. a,78 31~ 33 ~~?6 s r ~ f u f ~;~ 2 89 11 z o - r . . ~ - ~P~ 1 : a~~ W = s3c~a 1 /~ Ess S7~Z .,B s L j~/~" ~~~ e~ •/1tE73 ~~~ %~~ E'~ ,ALL ~' rPcl~'s' , 3 .~' ss ,e® ~ E-- c~ 80TTOM OF TUBING TAIL Remark CG ~ s s ~" E s w r rEa2 Fs , ~//~X ' iDE LAS ihl S w ` YE72 .T'iJ1ec` 4F "C," f~~`,x _ /cr17Y I~O~ M 'l tt [ t ,i ~~ ,. , 3,r ~f~ ARCH PAA 118 QUALITY LITHO PRIHTINO - ANCHORAGE • ~~p~~ 0~ Q~Q~~{Q ~~ ~ottsEa~,~o <o~ss.oN • SEAN PARNELL, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907)276-7542 Gary Eller Wells Engineer ConocoPhillips Alaska, Inc. F., 4~',. b~ I P.O. Box 100360 ~ ~ ~ ~~~~~-~ ~`~ ~~~'~`' Anchorage, AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, 1 R-06 Sundry Number: 310-146 Dear Mr. Eller: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31,.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. Chair DATED this ~ day of May, 2010. Encl. ~~ ~ /\~ v 20 AAC 25.280 ~EC~iv~ MAY Q 6 201QS~~~ 1. Type of Request: Abandon Rug for Redrill ~ Perforate New Pool ~""' Repair well ~ ,j~~~ Suspend Rug F~rforations F~rforate FUII Tubing ""' q~~ion Operational Shutdown J~ Re-enter Susp. Well ~ Stimulate Alter casin g Other: Lock out SSSV ~' 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConocoPhillips Alaska, Inc. Development °°"' Exploratory 185-071 - 3. Address: Stratigraphic ~"'` Service 6. API Number: P. O. Box 100360, Anchora e, Alaska 99510 50-029-21331-00- 7. If perforating, closest approach in pool(s) opened by this operation to nearest property line 8. Well Name and Number: where ownership or landownership changes: Spacing Exception Required? Yes N o 1R-06 , 9. Property Designation: 10. Field/Pool(s): ADL 25635 Kuparuk River Field / Kuparuk River Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total depth MD (ft): Total Depth ND (ft): Effective Depth MD (n): Effective Depth ND (ft): Plugs (measured): Junk (measured): 9303 ~ 6998 - 9188' 6890' 9145' Casing Length Size MD ND Burst Collapse CONDUCTOR 80 16 110' 110' SURFACE 4575 9.625 4659' 3694' PRODUCTION g194 7 9278' 6975' Pertoration Depth MD (8582'-8588', 8692'-8742', Perforation Depth ND (ft): 6379'-6383', 6465'- Tubing Size: Tubing Grade: Tubing MD (ft): 8860'-8867', 8976'-8984', 8994'-9024', 9028'-9038' 6505', 6601'-6607', 6700'-6707', 6715'-6741', 6745'-6754' 3.5 J-55 8932 Packers and SSSV Type: Packers and SSSV MD (ft) and ND (ft) PKR - BAKER'FHL' MD= 8435 ND= 6266 PKR - BAKER'FB-1' MD= 8909 ND= 6642 TRDP - CAMCO 'TRDP-1A' MD= 1908 ND= 1850 12. Attachments: Description Sumrery of Ftoposal ~`°" 13. Well Class after proposed work: Detailed Operations Program BOP Sketch " ExQloratory ~" Development Service 14. Estimated Date for Commencing Operations: 5/11/2010 15. Well Status after proposed work: i Oil Gas WDSPL ~ Suspended ~' 16. Verbal Approval: Date: WINJ ~ GINJ J-'` WAG Abandoned Commission Representative: GSTOR ~ SPLUG ~"" 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Gary Eller @ 263-4172 Printed Name Ga Elle Title: Wells Engineer Signature Phone: 263-4172 Date C mmi i n s nl Sundry Number: 3~ l,~ ~G Conditions of approval: Notify Commission so that a representative may witness P Test ~``; Mechanical Integrity Test ~ Location Clearance ~'°' Plug Integrity B O / ~ Other: ~~ / ~~ w _ 0 ~/ C~~.6,'Cr~ Subsequent Form Required: / b - ~l Q APPROVED BY C ~ /~ Approved by: COMMISSIONER THE COMMISSION Date: J STATE OF ALASKA ALAS~L AND GAS CONSERVATION COMMISSI~ APPLICATION FOR SUNDRY APPROVALS Form 10-403 Revised 1/2010 O R{ G I N A L ~ s Submit in Duplicate /3- /a ~~'~ - KUP ~C?1'}t)CC3~'1l~~lp5 I Well Attributes - ----- Welllwre APl/UWI Field Name Well Status /''`i""" t I~ ~-" 5002921 33 7 00 ~KUPARUK RIVER UNIT IINJ C ent iH2S (ppm) Date (Annotation Entl Date gi_C ng 1R O¢„427n mati6c~a.+ SSSVTRDP ~i Last WO W _ __ Stltemeti AM aI -A tation ' Depth (ftK6) End Date (Annotation Last Tag: SLM 8,986.0 4/22/2010 Rev Reason: Tag Pull PluglGauge~ Ito SAFETY VLV. 1,908 GAS LIFT. 2u4' GAS LIFT, 4.326 SURFACE. 4,659 GAS LIFT, 5,631 GAS LIFT, fi.285 GAS LIFT, s.7sz GAS LIFT, ].198 GAS LIFT, 7.615 GAS LIFT. 8.06: GAS LIFT, 8.381 PBR, 6,621 PACKER, 8,435 -- ~ PRODUCTION. __ -__ 8.473 PRODUCTION, _-__ 8.540 IPERF, _______~ 8,582-8,580 IPERF, 8,692-8.742 IPERF, 8,860-B.B6T- ,_ PACKER.8505 NIPPLE, 8,924 SOS. 8,931 TTL. 8,932 IPERF, 8,9]6-8,986 IPERf, 8,994-9,024 IPERF. - 9.0289,038 FISH.9.145 PRODUCTION, 9,276 TD. 9,303 6,974.8 TUBING I Description Comment Run Date 3.48 SAFETY VLV Camco'TRDP-1 A' (NOT Locked Out) May hang up 5/21/1995 toolsTring if control line pressure bleeds down. 1.00 GAS LIFT CAMCO/KBUGl1/DMY/BK/// Comment: STA 1 111917987 1.26 I GAS LIFT CAMCO/KBUGl1/DMY/BK//l Comment STA2 11/10/1987 3.37 GASLIFT ___.. CAMCOIKBUG/1/DMY/BK/!l CommenCSTA3 __-_- 11/1011987 3.27 GAS LIFT CAMCO/KBUG/1/DMYlBWI/Comment: STA6 6/30/1985 3.32 GAS LIFT CAMCO/KBUG71/DMYBK///Comment STAS 11/10/1987 7.03 GAS LIFT CAMCO/KBUG/1/DMY/BK/// Comment: STA 6 6/30!1985 i.05 GAS LIFT I CAMCO/KBUG/1lDMY/BK///Comment: STA7 11/10/1987 4.95 GAS LIFT CAMCO/KBUG/11DMY18W//Comment: STAS 1117 0/1 98 7 >60 GAS LIFT CAMCO/MMG-2/LS/DMY/RW//Comment STA9 11/10/1987 8 421 41.09 PACKER Baker'FHL' PACKER 40.50 PRODUCTION CAMCOlMMG-2/1.5lDMY/RK/// Comment: STA 10 39.40 PRODUCTION iGAMCG/MMG-211.5/DMYlRK//! Comment STA 11 33.19 PRODUCTION CAMCO/MMG-211_5/DMY/RW.25!/ Comment STA 12 9,145 1 6,852.0( 22 94 1 FISH 1 311 5/1 9 86 1 7!2" GLV Valve Dropped; Could Still be in Tubing String .. rfora tions & Slots __ --- - I snoi Top (TV D) Btm (TVD) ~ Dens (ftK6( 81m (ftK6) (ftK6( (HKB) Zone Date ', (sh... I Type Commetrt $582 , 8,588 6,378 .5 6,383.1 C -0, 1R-06 6/30!1985 12 OIPERF 5.5" HJ II Csg Gun;120 tleg phase 8,692 8,742 6 465 0 6,505.0 C- 1, UNIT B, 6/30/1985 12.0 IPERF 5.6" HJ II Csg Gun;120 deg phase 1 R -06 8,860 8,867 6,601 .4 6,607.1 U NIT 6. 1R-06 6/30/1985 72.0 IPERF S 5" HJ II Csg Gun;120 deg phase 8.976 8,984! 6.699 .6 6,706.6 A -0, 1 R-06 6!30/1985 4.0 IPERF 4" HJ II Csg Gun' 90 deg. ph 8,9941 9 024 ~ 6.715 3 6 741 2 A-3, 1R-06 6/30/1985 4 0 IPERF 4" HJ II Csg Gun' 90 deg. ph - __ - -__ A-3. 1 R-06 6/30/1985 4 O;IPERF 4" HJ II Csg Gun' 90 deg ph 9,028', 9.038' 6,744.8 6 753.9 Ites: General & Safety End Date Annotation 3/2010 '. NO1 E Suspect Tubing leak between 8572' & 8868' 1 R-06 & M D TD_ (8~-. Act Btm (kKB) 100.00 9,303.0 d (ft) Rig Release Dal 37.61 5/15/1985 '.od By ~i End Date 1 R-06 Pre-CTD Schematic MD C-sand perfs -Squeezed 8582' - 8588' MD 8692' - 8742' 8860' - 8867' Tubing perfs at 8791' & 8819' a A-sand perfs -Plugged 8976' - 8984' MD 8994' - 9024' 9026' - 9038' Last Updated: 30-Apr-10 Camco TRDP-tA S: Locked out ~ !10 9.3#! L-80 EUE Srd Tubing to surface !2" Camco KBUG gas lift mandrels @ 2041, 4326, 5631, 6285, 6762, 7198, 7615, & 8061. mco MMG-2 mandrel al 8381 3-112" PBR @ 8421' MD (3" ID) FHL packer @ 8435' MD (4.0" ID) Camco MMG injection mandrels @ 8473, 8545 (OPEN), 8 8890 FB-1 packer @ 8909' MD (4,0" ID) SBE @ 8913' MD 1/2" Camco D landing nipple @ 8924 MD 2.75" min ID, No-Go 1!2" tubing tail @ 8932' MD J • 7" 26# J-55 shoe @ 9278' MD • • 1R-06 Pre-CTD Sidetrack Prep Wells network: not yet available The anticipated spud date for Nabors CDR2-AC to drill four CTD A-sand horizontal laterals from well 1 R-06 is June 2010. Objectives: Prep well for a CTD sidetrack out the 31/Z" x 7" selective o Slickline: RIH with gauge ring and dummy guns. Pull dummy from injection mandrel #11 at 8544'. POOH. o Slickline: Lock out Camco SCSSV at 1908' MD o E-line: Set CIBP in 3'/2" tubing tail at 8920' MD to permanently plug A-sand perfs o E-line: Shoot squeeze perfs through 3'/2" tubing & 7" casing at 8819' & 8791' ELM (correlated with GR log) o Coil: Lay in cement plug from CIBP. Squeeze C-sand perfs. o Slickline: Tag top of cement. Pressure test cement plug o Coil: Drill out cement to the top of the CIBP using special-clearance bi-center bit o Slickline: Run whipstock dummy. Pressure test cement plug. o E-line: Run slimhole CBL to evaluate cement behind the 3 %2" x 7" selective o Coil: Repeat squeeze if necessary Procedure• Plug A-Sand Perfs & Prep Wellbore for Squeeze Update ann-com status (ex: test tree valves & SSSV, MIT-IA, etc.) as per attached generic procedure. 2. MIRU Slickline. RIH with gauge ring and 2'/z" dummy guns to 8900'. Pull dummy from injection mandrel #11 at 8544'. POOH. 3. Permanently lock out the Camco TRDP-lA subsurface safety valve at 1908' MD. POOH, RDMO slickline. 4. MIRU e-line. PU Halliburton EZ-Drill cast iron bridge plug (CIBP) for 3'/2", 9.3 ppf tubing. Running OD of the EZ-Drill CIBP is 2.69". RIH, tie in with CCL. Set CIBP at 8920' MD (i.e. middle of the 6.07' pup joint just above the 2.75" D-nipple in the tailpipe). 5. MU perf guns including GR/CCL. RIH with jet perfs for the 3'/2", 9.3 ppf straddle assembly. Suggest using a 2%" hollow carrier gun loaded 6 spf, 60° phase with Halliburton Millennium II HMX charges (#101418095, 11.1 gm) with 0.32" entrance hole and 24.5" API penetration. Correlate with gamma ray to Schlumberger CBL dated 6/8/85 -can use the K1 marker at 8644' CBL for correlation. Shoot the following intervals, and then POOH: a) 8819'- 8831' GR (12' of guns) b) 8791' - 8803' GR (12' of guns) Apri130, 2010 Page 1 of 8 1R-06 Pre-CTD Sidetrack Pre r~ L Note: If unable to get a good gamma ray tie-in due to scale/NORM, can use a CCL tie-in only after consulting with the CTD En ineer (Gary Eller - 529-1979). Cement Squeeze/Plugback 6. MIRU 2" or 13/4" CT unit. MU standard balldrop nozzle w/jet swirl profile. and 5' stinger to CT. Pump a dart through the coil tubing to calibrate coil reel volume. 7. RIH to CIBP at 8920' MD. Fill the hole with heated seawater or KCl water while waiting on cement to mix. Volume of 3'/2" tubing at 8920' MD is ~78 bbl (0.0087 bbl/ft). Volume of the 3'/2" x 7" annulus from the lower packer to the top of the C-sand perfs (80', 8582' - 8909', 0.0264 bbl/ft) is 8.6 bbl. Establish injection -record this as baseline pressure for remaining squeeze operations. 8. RU cementers. Batch mix a pumpable 35 bbl of 15.8 ppg cement. Cement specs: 15.8 ppg densit thickenin time of 6 hours ~-°~ '~'°°'~ °'-°~+~ and fluid loss of 90-130 ml/30mins. Y, g , a_~ ------- --a=----, Assume BHT (circulating) _ 110° F. See attached cement spec sheet for SLB lab. • Ultimate target TOC is 8582' MD (i.e. top of the C-sand perfs). The 35 bbl of cement can conceivably go as high as 4827' MD in the 3'/2" tubing if none gets placed into the selective or squeezed into the C-sand. Historically, we have averaged 10-15 bbl of cement behind pipe in most C-sand squeezes, but some have required far more. • Bring pod up to weight and shear thoroughly. QC test cement. Send sample to lab for UCA testing. • Cement is cheap compared to the cost of a bad cement job. In 2007 it cost ~$350k to under-ream and re-cement well 1 C-03 from the Nordic #2 rig when that pre-rig cement plug got contaminated. Pump plenty of cement to get the job done, and make sure that the well never gets underbalanced to contaminate the cement. • Expected C-sand reservoir pressure = 2545 psi = 7.4 ppg EMW at 6601' TVD (April 2010). Measured reservoir temperature 120° F. Assume BHT (circulating) _ 110° F. • Expected fracture pressure = 4290 psi (assumes frac gradient = 0.65 psi/ft = 12.5 ppg EMW). Equates to 1380 psi at the surface with seawater in the hole. • Monitor annulus pressures while pumping and bleed off as necessary. Max IA & OA pressure should be 2000 psi & 1000 psi respectively. 9. Pump the following down the coil: a) water spacer for PT (do not use friction reducer, J313 will clabber cement) b) 35 bbl neat 15.8 ppg cement c) 5-10 bbl of spacer water d) 1.5# Biozan gel for cement clean out 10. Position nozzle as deep as possible as cement reaches nozzle. Take returns and allow cement top in casing to rise 50' above nozzle before beginning pulling up hole. Verify getting 1:1 returns in 40 bbl open top tank before moving nozzle. POOH laying in cement 1:1. Apply backpressure as needed to maintain max of 1:1 returns (no excess returns). a) Note: Assume wellbore capacity of 0.0351 bbl/ft to determine POOH speed until up above the open injection mandrel at 8544. Above 8544' assume 0.0087 bbllft capacity. For example, if pumping at 1.0 bpm, POOH at 28 fpm until 8544', and then increase to 115 fpm. April 30, 2010 Page 2 of 8 1 R-06 Pre-CTD Sidetrack Pre 11. When the CT nozzle reaches 8500' MD, close the choke and begin applying squeeze pressure with the choke while continuing to slowly POOH. Stage up hesitation squeeze pressure to a target squeeze pressure of 2000 psi. Use 500 psi or 18 bbl of cement away (whichever comes first) as the increment for the first hesitation, and 500 psi or 5 bbl increments thereafter. Hold ~ each hesitation 10-15 minutes. • If we're unable to achieve minimum 1000 psi squeeze pressure will have to pump another batch of cement, so pump away remaining cement into perfs. • This targeted squeeze pressure of 2000 psi exceeds frac pressure. The only hope of - achieving that pressure is through hesitations, allowing nodes to build upon the perfs. • No need to stop moving pipe or stop pumping while squeezing. Just use the choke to apply squeeze pressure while slowly POOH pumping. 12. If squeeze was successful, POOH laying in remaining cement while continuing to hold squeeze pressure at the choke. Pull up 100' out of the top of cement. Use the choke to maintain final squeeze pressure (target squeeze pressure of 2000 psi, minimum = 1000 psi) for 30 minutes while circulating at minimum rate. 13. After final squeeze pressure is achieved, reduce the surface pressure by 500 psi and maintain this pressure for the rest of the job to keep overbalance on the formation. (Example: If we get a squeeze to 2000 psi, maintain at least 1000 psi on the well for the rest of the job.) Circulate 1.5# Biozan and launch ball. Chase ball to nozzle then RIH at 1:1 jetting/contaminating at max rate down to the target top of cement at 8582' MD. 14. Swap to 0.5# Biozan water. Jet uphole at 80% running speed and max rate, continuing to hold overbalance on the cement. Wash all GLMs and C-sand injection mandrels, particularly those that contacted cement. Freeze protect top 2000' of well bore. Thoroughly wash the tree and BOP stack. 15. Trap pressure at surface to maintain overbalance on partially set cement after coil leaves. RDMO coil tubing. a) Note: May re-squeeze if we were unable to build adequate squeeze pressure the first time. 16. Allow cement to fully cure (72 hours or more recommended). 17. MIRU slickline. Drift tubing, tag top of cement. Pressure test cement plug to 2500 psi while monitoring pressure on IA. Give the AOGCC 24-hour notice to witness the pressure test if they so desire. RDMO slickline. ~,~,+k~yrt Ne (" rG~w;,,-,wQ ~~J-la Drill Out Cement 18. MIRU 13/4" or 2" coiled tubing. Include acirc-sub in the BHA. PU 2-3/8" Weatherford right- hand motor and Hycalog bi-center bit. (Note: Hycalog has specially turned down the OD of one of their bi-center bits to cut a 2.98" hole. Use this bit for drilling out the cement in 1 R-06. It will be mounted on the Weatherford motor at Weatherford's shop prior to the job. Give Weatherford a few days notice so they can get the 2-3/8" motor prepped.) Drill out cement inside the 3'/2" tubing down to the top of the CIBP at 8920' MD. Do not drill out the CIBP at 8920' MD. Drop the ball to open the circ sub, circulate clean, POOH. Freeze protect top 2000'. RDMO coiled tubing. Apri130, 2010 Page 3 of 8 ~, 1R-06 Pre-CTD Sidetrack Pre ~~ a) Don't get in a hurry drilling out the cement with this bi-center. Do not exceed 2 fpm drilling rate to give time for the bi-center to fully clean off the tubing wall. b) Do not break out the bit on location. Send the motor and bit back to Weatherford's shop to be broke out there. Last time we broke out the bit on location we junked a $20,000 bit (we113I-11, December 2009). 19. MIRU slickline. Run whipstock dummy. Pressure test cement to 2500 psi while monitoring pressure on IA. Perform no-flow test on cement plug. 20. MIRU e-line unit. Run slimhole CBL (Halliburton 1-11/16" RCBL) across straddle section to evaluate cement behind the 3'/2" selective. May possibly re-squeeze if the C-sand does not look adequately isolated. Confirm with CTD Engineer before proceeding to final step. 21. If the well did not pass a no-flow test, set a BPV in the tubing hanger. No BPV is needed if the well passed a no-flow test. Prep location for CTD rig. "'~~ S=~~F-l a %~ . API/` ,^ ~..-~~G..D ~'~ i ~~.se . i~~ Apri130, 2010 Page 4 of 8 • Cono P ' ' co hillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 August 31, 2009 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7`~ Avenue, Suite 100 Anchorage, AK 99501 ~ __I SEP 0 2 2009 ~~~~k~ Q~I ~ C~~ ~~nas Corrxnission Anchor~ ~ g~ ~'~ I '~~,- ° ~0 . 1r`r~:,e. i~ y ,~~ . ~ lL.,~ ~..' ~+1 L. i; tiii.k~` - .. Dear Mr. Maunder: Enclosed please find a spreadsheet with a list of wells from the Kuparuk field (KRi~. Each of these wells was found to have a void in the conductor. These voids were filled with cement if needed and corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The cement was pumped August 15~` and 23`a 2009, and the corrosion inhibitor/sealant was pumped August 27~', 28;~ and 29~' 2009. The attached spreadsheet presents the well name, top of cement depth prior to filling, and volumes used on each conductor. Please call Perry Klein or MJ Loveland at 907-659-7043, if you have any questions. Sincerely, .~"'~~ MJ Loveland ConocoPhillips Well Integrity Projects Supervisor , :: ~ .~ A. ~ ~~ , ~-.. . _ • • ~`i~ ~;; ~> ')~';~ ~~~ ~ ~ r ~ _ _.., ~ . e..,. , .~ ConocoPhillips Alaska Inc. Surtace Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Kuparuk Field Date 8/29/09 1 R PAD Well Name API # PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitoN sealant date ft bbls ft al 1 R-01 B 50029214040200 . 2001560 13'7" 2.0 26" S/15/2009 5.1 8/27/2009 1 R-02 50029214050000 1851760 80' 13.30 23" 8/23/2009 4.7 8/28f2009 1 R-03A 50029214060100 2000210 15' 3.00 27" 8/15/2009 5.3 8/28/2009 1 R-04 50029214070000 1851780 15'2" 3.00 26" 8/15/2009 5.1 8/28/2009 1 R-05 50029213300000 1850700 20'9" 2.20 23" 8/15/2009 3.8 8/28/2009 1 R-06 50029213310000 1850710 14' 2.00 23" 8/15/2009 3.8 8/28/2009 1 R-07 50029213320000 1850720 44' S.00 24" 8/15/2009 4 8/28/2009 1R-08 50029213330000 1850730 8' 1.00 21" 8/15/2009 13.7 8/28/2009 1 R-09 50029213500000 1850950 9' 1.20 25" 8/15/2009 4.3 S/28/2009 1 R-10 50029213510000 1850960 32' 5.40 22" 8l15l2009 3.4 8l28/2009 1R-11 50029213520000 1850970 47' 6.00 38" 8/15/2009 13.9 8/28/2009 1R-12 50029213530000 1850980 38' 6.00 24" 8/15/2009 4 8/28/2009 1 R-13 50029213850000 1851500 10' 0.50 25" 8/15/2009 4.3 8/29/2009 1 R-15 50029213870000 1851520 21'4" 4.00 35" 8/15/2009 12 8/29/2009 1R-16 50029213880000 1851530 12'6" 9.00 21" 8/23/2009 3.8 8/29/2009 1 R-17 50029222120000 1911140 20" N/A 20" N/A 4.4 8/28/2009 1R-18 50029221880000 1910870 9'4" 1.20 21" 8/15/2009 3.7 8/28/2009 1 R-19A 50029221850100 1910850 18" N/A 18" N/A 102 S/29/2009 1 R-20 50029222070000 1911080 8'4" 2.00 19" 8/15/2009 11.3 8/29/2009 1 R-22A 50029222060100 1990490 16" N/A 16" NIA 9 8/29/2009 1 R-23 50029222000000 1911010 18'8" 2.30 39" 8/15/2009 13.9 8/29/2009 1 R-25 50029221530000 1910470 7'4" 1.50 26" 8/15/2009 5.1 8/27/2009 1 R-26 50029221930000 1910920 7' 3.50 38" 8/23/2009 13.9 8/28/2009 1R-27 50029222010000 1911020 18" N/A 18" N/A 5.1 8/28/2009 1 R-29 50029221950000 1910940 18" N/A 18" N/A 4.1 8/28/2009 1R-35 50029230500000 2012100 18" N/A 18" N/A 5.3 8/29/2009 1R-36 50029230570000 2012270 19" N/A 19" N/A 5.3 8/29/2009 . . Mike Mooney Wells Group Team Leader Drilling & Wells Conocó'Phillips P. O. Box 100360 Anchorage, AK 99510-0360 Phone: 907-263-4574 August 4, 2006 RECEIVED AUG 1 6 2006 Alaska Oil & Gas Cons. Commission Anchorage Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West ih Avenue Suite 100 Anchorage, Alaska 99501 Subject: Report of Sundry Well Operations for 1 R-06 (APD # 185-071) Dear Commissioner: ConocoPhillips Alaska, Inc. submits the attached Report of Sundry Well Operations for the recent stimulation operation on the Kuparuk well 1 R-06. ' If you have any questions regarding this matter, please contact me at 263-4574. ~."'" ,",\"~\"-ID:':L ....'w."..., ~-- (:, CJ (. G (:: v Sincerely, ~ .fx- M.l c.tIfJ£L fr1oc:WEi M. Mooney Wells Group Team Leader CPAI Drilling and Wells MM/skad · RECEIVED STATE OF ALASKA . AUG 1 6 2006 ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERA TIONlaska Oil & Gas Cons. Convnission 1. Operations Performed: Abandon D Repair Well D Plug Perforations D Stimulate 0 Other Anc~age Alter Casing D Pull Tubing D Perforate New Pool D Waiver D Time Extension D Change Approved Program D Operat. ShutdownD Perforate D Re-enter Suspended Well D 2. Operator Name: 4. Current Well Status: 5. Permit to Drill Number: ConocoPhillips Alaska, Inc. Development D Exploratory D 185-0711 3. Address: Stratigraphic D Service 0 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 50-029-21331-00 . 7. KB Elevation (ft): 9. Well Name and Number: RKB 84' 1 R-06 8. Property Designation: 10. Field/Pool(s): ADL 25635, ALK 2568 Kuparuk River Field 1 Kuparuk Oil Pool 11. Present Well Condition Summary: Total Depth measured 9303' feet true vertical 6998' feet Plugs (measured) Effective Depth measured 9026' feet Junk (measured) 9145' true vertical feet Casing Length Size MD TVD Burst Collapse Structural CONDUCTOR 80' 16" 110' 110' SUR. CASING 4575' 9-5/8" 4659' 3694' PROD. CASING 9194' 7" 9278' 6975' Perforation depth: Measured depth: 8582'-8588',8692'-8742',8860'-8867', 8976'-8984', 8994'-9024', 9028'-9038' true vertical depth: 6379'-6383',6465'-6505',6601'-6607', 6700'-6707', 6715'-6742', 6746'-6755' Tubing (size, grade, and measured depth) 3-1/2" , J-55, 8932' MD. Packers & SSSV (type & measured depth) pkr- BAKER 'FHL'; BAKER 'FB-1' pkr- 8435'; 8909' Cameo TRDP-1A SSSV= 1908' 12. Stimulation or cement squeeze summary: Intervals treated (measured) Treatment descriptions including volumes used and final pressure: 700 bbls slick seawater 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Met Water-Bbl Casino Pressure Tubina Pressure Prior to well operation na na 230 -- Subsequent to operation na na 570 -- 14. Attachments 15. Well Class after proposed work: Copies of Logs and Surveys run _ Exploratory D Development D Service 0 Daily Report of Well Operations _X 16. Well Status after proposed work: OiID GasD WAGD GINJD WINJ0 WDSPL D 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A it C.O. Exempt: Contact Howard Gober @ 263-4220 Printed Name Howard Gober Title Wells Group Engineer g/lS/~"J Signature f::J2 .A~ Phone Date ....~... Prenared bv Sharon A/lsun-DfAk.. 263-4612 Form 10-404 Revised 04/2004 ORIGINAL RBDMS BFL AUG 1 8 2006 !~h, ,Áþ f' -/(, .(!)'- sUbm/Jna'(;~/Pó . 1 R-06 Well Events Summary . DATE Summary 07/14/0606:00 AM PUMP 700 BBLS OF SLICK SEAWATER DOWN TUBING FOR HIGH PRESSURE BREAKDOWN. AVERAGE RATE = 10 BPM AND 4000 PSI. BRING WELL BACK ON INJECTION AFTER PUMPING. . ConocoPhillips Alaska, Inc. . KRU R-06 ",.." -~.,.. 1R-06 API: 500292133100 Well Tvoe: INJ Anqle ((i) TS: 39 deq ((i) 8580 sssv SSSV Type: TRDP Orig 5/15/1985 Angle @ TD: 22 deg @ 9303 (1908-1909, Comoletion: 00:3.500) Annular Fluid: Last W/O: Rev Reason: TAG FILL Reference Loa: Ref LOQ Date: Last UDdate: 12/6/2004 Last Taq: 9026 TD: 9303 ftKB Last Tag Date: 11/12/2004 Max Hole AnQle: 60 deg @ 3100 Casino Strinc - ALL STRINGS Description Size Top Bottom TVD Wt Grade Thread CONDUCTOR 16.000 0 110 110 65.00 H-40 SUR. CASING 9.625 0 4659 3694 36.00 J-55 PROD. CASING 7.000 0 9278 6975 26.00 J-55 TubinQ Strina - TUBING Size Top I Bottom I TVD I Wt I Grade Thread 3.500 0 I 8932 I 6662 I 9.30 I J-55 I EUE 8RD Perforations Summarv Interval TVD Zone Status Ft SPF Date Tyoe Comment 8582 - 8588 6379 - 6383 C-4 6 12 6/30/1985 IPERF 5.5" HJ II Csg Gun;120 deg phase 8692 - 8742 6465 - 6505 C-1,UNIT 50 12 6/30/1985 IPERF 5.5" HJ II Csg Gun;120 deg B ohase 8860 - 8867 6601 - 6607 UNITB 7 12 6/30/1985 IPERF 5.5" HJ II Csg Gun;120 deg phase 8976 - 8984 6700 - 6707 A-4 8 4 6/30/1985 IPERF 4" HJ II Csg Gun' 90 deg. oh 8994 - 9024 6715 - 6742 A-3 30 4 6/30/1985 IPERF 4" HJ II Csg Gun' 90 deg. oh 9028 - 9038 6746 - 6755 A-3 10 4 6/30/1985 IPERF 4" HJ II Csg Gun' 90 deg. oh Gas Lift MandrelsNalves St MD TVD Man Man Type V Mfr V Type VOD Latch Port TRO Date Vlv Mfr Run Cmnt 1 2041 1964 Camco KBUG DMY 1.0 BK 0.000 0 11/9/1987 2 4326 3449 Camco KBUG DMY 1.0 BK 0.000 0 11/10/198 3 5631 4356 Cameo KBUG DMY 1.0 BK 0.000 0 11/10/198 PBR 4 6285 4788 Cameo KBUG DMY 1.0 BK 0.000 0 6/3011985 (8421-8422, 00:3.500) 5 6762 5104 Cameo KBUG DMY 1.0 BK 0.000 0 11/10/198 6 7198 5396 Cameo KBUG DMY 1.0 BK 0.000 0 6/3011985 PKR 7 7615 5684 Cameo KBUG DMY 1.0 BK 0.000 0 11/10/198 (8435-8436, 8 8061 5996 Cameo KBUG DMY 1.0 BK 0.000 0 11/10/198 00:6.156) 9 8381 6226 Cameo MMG-2 DMY 1.5 RK 0.000 0 11/10/198 Production MandrelsNalves St MD TVD Man Man Type V Mfr V Type VOD Latch Port TRO Date Vlv Mfr Run Cmnt 10 8473 6295 CAMCO MMG-2 DMY 1.5 RK 0.000 0 1/21/1993 11 8544 6349 CAMCO MMG-2 DMY 1.5 RK 0.000 0 11/21/199J 12 8890 6626 CAMCO MMG-2 DMY 1.5 RK 0.250 0 4/2112002 Other (I luas. equip., etc.) - JEWELRY - - Depth TVD Tvpe Description ID - - 1908 1850 SSSV Camco TRDP-1A' (NOT Locked Out) May hang up on Tool String; MCX 2.812 = = Pulled 5/21/95 - - 8421 6256 PBR Baker 3.000 - - 8435 6266 PKR Baker 'FHL' 3.000 = = - - 8909 6642 PKR Baker 'FB-1' 4.000 - - 8924 6655 NIP Camco 'D' Nioole NO GO 2.750 8931 6661 SOS Camco 2.992 8932 6662 TTL 2.992 Fish - FISH Deoth I Descriotion I Comment PKR 9145 11 1/2" GLV I Valve Drooped; Could Still be in TubinQ Strino (8909-8910, General Notes 00:6.156) Date I Note 1/27/19981 ~OTE on Schematic: TRDP is NOT Locked Out and may hang up toolstring if control line pressure NIP bleeds down. (8924-8925, 003.500) TUBING (0-8932, 00:3.500, 10:2.992) Perf - - (8976-8984) - - Perf = = (8994-9024) - - Perf = = (9028-9038) - - - - ~ ) ConocóP'hillips ) Mike Mooney Wells Group Team Leader Drilling & Wells P. O. Box 100360 Anchorage, AK 99510-0360 Phone: 907-263-4574 November 22, 2004 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 NOV 2 2004 Subject: Report of Sundry Well Operations for 1 R-06 (APD # 185-071) Dear Commissioner: ConocoPhillips Alaska, Inc. submits the attached Report of Sundry Well Operations for the recent stimulation operations on the Kuparuk well 1 R-06. If you have any questions regarding this matter, please contact me at 263-4574. Sincerely, NIl MOCt~ M. Mooner Wells Group Team Leader CPAI Drilling and Wells MM/skad SCANNED NO\! 2 9 'LDD4 OF~/GINlL ) ) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONStiik' Abandon 0 RepairWell 0 Alter Casing 0 Pull Tubing 0 Change Approved Program 0 Operat. ShutdownO 2. Operator Name: ConocoPhillips Alaska, Inc. 3. Address: P. O. Box 100360, Anchorage, Alaska 7. KB Elevation (ft): RKB 84' 8. Property Designation: ADL 25635, ALK 2568 11. Present Well Condition Summary: 1. Operations Performed: Total Depth Effective Depth Casing Structural CONDUCTOR SUR. CASING PROD. CASING Perforation depth: measured 9303' feet true vertical 6998' feet measured 9035' feet true vertical 6752' feet Length Size MD 110' 16" 110' 45751 9-5/8" 4659' 91941 7" 9278' 2004 Plug Perforations 0 Perforate New Pool 0 Perforate 0 4. Current Well Status: Development 0 Stratigraphic 0 Stimulate 0 Waiver 0 Re-enter Suspended Well Other Exploratory 0 Service 0 5. Permit to Drill Number: 185-071 1 6. API Number: 50-029-21331-00 9. Well Name and Number: 1 R-06 10. Field/Pool(s): Kuparuk River Field 1 Kuparuk Oil Pool Plugs (measured) Junk (measured) 9145' TVD Burst Collapse 110' 3694' 6975' Measured depth: 8582'-8588',8692'-8742',8860'-8867', 8976'-8984', 8994'-9024', 9028'-9038' true vertical depth: 6379'-6383', 6465'-6505', 6601 '-6607', 6700'-6707'. 6715'-6742'. 6746'-675~ 8FL NOV 29 2004 Tubing (size, grade, and measured depth) 3-1/2" , J-55, 8932' MD. Packers & SSSV (type & measured depth) pkr= BAKER 'FHL'; BAKER 'FB-1' 8435'; 8909' Camco'TRDP-1A' 1908' 12. Stimulation or cement squeeze summary: Intervals treated (measured) 8976'-89841, 8994'-9024', 9028'-9038' 13. Treatment descriptions including volumes used and final pressure: 730 bbls of slick seawater Oil-Bbl n/a Prior to well operation Subsequent to operation 14. Attachments Copies of Logs and Surveys run - Daily Report of Well Operations_X Representative Daily Average Production or Injection Data Gas-Met Water-Bbl n/a Casinq Pressure TubinQ Pressure SI 15. Well Class after proposed work: Exploratory 0 Development 0 Service 0 16. Well Status after proposed work: Oil 0 GasO WAG 0 GINJO WINJ 0 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NJA if C.O. Exempt: Contact Printed Name Signature Mike Mooney @ 263-4574 Mike Mooney MJ ;t~. l { vr..--J Form 10-404 Revised 04/2004 WDSPLO Title Phone Kuparuk Wells Team Leader Date JI/Z 5}4 PreDared bv Sharon AI/suo-Drake 263-4612 ORIGINA- Submit Original Only ) PHilliPS Alaska, Inc. A Subsidiary of PHilLIPS PETROLEUM COMPANY 1.[ ":r r 1R-06 ~ i,.d I II I API: 500292133100 r i SSSV Type: TRDP , ~,¡ ¡ 11]-- I M QI: Iii' í it." II 'rl'l_~. ill .1 ~;. ¡' Emil' j~' IIII~):. ~' PKR (8435-8436. OD:6.156) ~I _I =f..,..!..it ~ !J: ~t ~: PKR (8909-8910, OD:6.156) \- -----' ~ -----' . -' ~ ~II. .t ! ¡ "-! I :~ ... 1111 ..::;ø I . 1l I , I I $I' . :1 "--- :~:= .r¡- jÞ . f LII ~ :1r- . -- .- ...~ .- . "-- Q Annular Fluid: Reference Log: Last Tag: 9035 Last Tag Date: 4/21/2002 Casing String - ALL STRINGS Description Size CONDUCTOR 16.000 SUR. CASING 9.625 PROD. CASING 7.000 Tubing String - TUBING Size I Top 3.500 0 Periorations Summary Interval TVD 8582-8588 6379-6383 Zone C-4 8692 - 8742 6465 - 6505 C-1,UNIT B 8860 - 8867 6601 - 6607 UNITB 8976 - 8984 6700 - 6707 A-4 8994 - 9024 6715 - 6742 A-3 9028 - 9038 6746 - 6755 A-3 Gas Lift MandrelsNalves St MD TVD Man Mfr Camco Cameo Camco Cameo Cameo Camco Cameo Cameo Camco 1 2 3 4 5 6 7 8 9 2041 1964 4326 3449 5631 4356 6285 4788 6762 5104 7198 5396 7615 5684 8061 5996 8381 6226 Man Type KBUG KBUG KBUG KBUG KBUG KBUG KBUG KBUG MMG-2 ) KRU 1 R-06 Well Type: INJ Orig 5/15/1985 Completion: Last W/O: Ref Log Date: TD: 9303 ftKB Max Hole Angle: 60 deg @ 3100 Angle ~ TS: 39 deg @ 8580 Angle @ TD: 22 deg @ 9303 Rev Reason: GL V by ImO Last Update: 7/5/2002 Bottom 8932 Top Bottom TVD Wt Grade Thread 0 110 110 65.00 H-40 0 4659 3694 36.00 J-55 0 9278 6975 26.00 J-55 TVD Wt I Grade I Thread 6662 9.30 J-55 EUE8RD Status Ft SPF Date 6 12 6/30/1985 50 12 6/30/1985 7 12 6/30/1985 8 4 6/30/1985 30 4 6/30/1985 10 4 6/30/1985 Type Comment IPERF 5.5" HJ II Csg Gun;120 deg phase ¡PERF 5.5" HJ II Csg Gun;120 deg phase IPERF 5.5" HJ II Csg Gun;120 deg phase IPERF 4" HJ II Csg Gun' 90 deg. ph IPERF 4" HJ II Csg Gun' 90 deg. ph ¡PERF 4" HJ II Csg Gun' 90 deg. ph V Mfr V Type VOD Latch Port TRO Date Vlv Run Cmnt DMY 1.0 BK 0.000 0 11/9/1987 DMY 1.0 BK 0.000 0 11/10/1987 DMY 1.0 BK 0.000 0 11/10/1987 DMY 1.0 BK 0.000 0 6/30/1985 DMY 1.0 BK 0.000 0 11/10/1987 DMY 1.0 BK 0.000 0 6/30/1985 DMY 1.0 BK 0.000 0 11/10/1987 DMY 1.0 BK 0.000 0 11/10/1987 DMY 1.5 RK 0.000 0 11/10/1987 V Mfr V Type VOD Latch Port TRO Date Vlv Run Cmnt DMY 1.5 RK 0.000 0 11/21/1992 DMY 1.5 RK 0.000 0 11/21/1992 DMY 1.5 RK 0.250 0 4/21/2002 St MD TVD Man Man Mfr Type 10 8473 6295 CAMCO MMG-2 11 8544 6349 CAMCO MMG-2 12 8890 6626 CAMCO MMG-2 Other (3Iugs, equip., etc.: - JEWELRY Depth TVD Type 1908 1850 SSSV 8421 6256 8435 6266 8909 6642 8924 6655 8931 6661 8932 6662 PBR PKR PKR NIP SOS TTL ID 2.812 Description Camco'TRDP-1A' (NOT Locked Out) May hang up on Tool String; MCX Pulled 5/21/95 Baker Baker 'FHL' Baker 'FB-1' Cameo 'D' Nipple NO GO Cameo 3.000 3.000 4.000 2.750 2.441 2.441 Depth 9145 Date Note 1/27/1998 NOTE on Schematic: TRDP is NOT Locked Out and may hang up toolstring if control line pressure bleeds down. ) 1 R-06 Well Events Summary ) Date Summary 11/02/04 POOR BOY HPBD COMPLETED. PUMPED 730 BBlS OF 60 DEGREE SLICK SEAWATER. MAX WHTP 4000 PSI & MAX RATE 9.3 BPM. RETURNED WEll TO PW INJECTION POST BREAKDOWN. [HPBD] 11/12/04 TAGGED AT 90261 RKB, EST. 121 FILL. [Tag] MEMORANDUM TO: Dan Seamount Commissioner State of Alaska Alaska Oil and Gas Conservation Commission DATE: September 28, 2000 THRU: BlairWondzell ,¢r20_."_ P.I. Supervisor FROM: John Crisp ~(~,~, ~. Petroleum Inspector NON- CONFIDENTIAL SUBJECT: Mechanical Integrity Tests Phillips Alaska Inc. 1 R Pad 03,06,08,10,15 Kuparuk River Unit Kuparuk River Field Well! 1R-03 P.T.D.I 1851770 Notes: P.T.q'.I 1850710 Notes: WeJII 1R-08 P.T.D.I 1850730 Notes: Packer Depth Pretest Initial 15 Min. 30 Min. · ]Typelnj.I N I T.V.D. I 6403 [.Tubing I 1075 [ 1075 I 1075 I 1075 I lntervall 4 TypetestI P ITestpsil 1601 I Casingl 1150 I 1610 I 1605 I !600! P/F I_pP- Typetes.tI P ITestpsil 1567 I Casingl 121oI 2000 I 19601 1950 I P/F I --P' Type testI P I TestpSil 1595 I CasingI 124~) I 1900 I 1890 I 1875 I P/F I __P- P.T.D.I 1850960 ITypetestl P ITestpsi[ 1564 I Casingl 1000I 2120 I 2080 I 2070 I P/F [ P- Notes: . WellI 1R-15 I Typelnj. I S ] T.V.D. I 6318 I Tubing I '2380 ! 2350 I 2350 I 2350 I lntervall 4 P.T.D.I 1851520 TypetestI P ITestpsil 1580 i Casingl 132.5 [.192.5 I 1925 I 1940t P/F I P Notes: Type INJ. Fluid Codes F: FRESH WATER INJ. G: GAS INJ. S = SALT WATER INJ. N = NOT INJECTING Type 'rest M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Test's Details Interval I= Initial Test 4= Four Year Cycle V= Required by Variance W= Test during Workover 'O= Other (describe in notes) I wimessed 5 successful MIT's on 1R pad in KRU. Testing done in safe & efficient manner by Phillips rep. Jerry_ Dethlefs. .I.T.'s performed: 5_ Attachments: none Number of Failures: 0 Total Time during tests: 2 hrs. cc: MIT report form 5/12/00 L.G. MIT KRU 1Ra 9-28-00jc.xls 10/3/00 STATE Of ALASKA "-~- ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Type of Request: Operation Shutdown __ Stimulate __ Plugging Perforate _ Pull tubing Alter casing Repair well Pull tubing Other ~X 2. Name of Operator ..ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service 4. Location of well at surface 272' FNL, 222' FEL, Sec. 19, T12N, R10E, UM At top of productive interval 4159' FNL, 3636' FEL, Sec. 19, T12N, R10E, UM At effective depth 4339' FNL, 3901' FEL, Sec. 19, T12N, R10E, UM At total depth 4376' FNL~ 3925' FEL, Sec. 19~ T12N, R10E, UM 12. Present well condition summary Total Depth: measured 9 3 0 3' feet true vertical 6996' feet Plugs (measured) 6. Datum elevation (DF or KB) RKB 84 feet 7. Unit or Property name Kuparuk River Unit 8. Well number 1R-06 9. Permit number/approval number 85-71/7-878 10. APl number 50-029-21331-00 11. Field/Pool Kuparuk River Oil Pool Effective depth: measured 91 88' feet Junk (measured) true vertical 6890' feet Casing Length Size Cemented Structural Conductor 1 1 0' 1 6" 250 Sx CS II surface 4659' 9 5/8" 1250 Sx PF"E" !11 & Intermediate 420 Sx PF"C" Production 9279' 7" 250 Sx Class G & Liner 200 Sx PF"C" Measured depth 110' 4659' 9279' True verti~l depth 110' 3692' 6976' 13. Perforation depth: measured 8582-8588, 8692-8742, 8860-8867, 8976-8984, 8994-9024, true vertical 6378-6383, 6463-6502, 6600-6605, 6698-6704, 6713-6738, Tubing (size, grade, and measured depth) 3 1/2" J-55 9.3 #/FT @ 8922' MD-RKB Packers and SSSV (type and measured depth) Baker 'FHL' @ 8899', Baker 'FB-I' @ 8921', Camco TRDP-1A SSSV @ 1897 Stimulation or cement squeeze summary CONVERT FROM OIL PRODUCER TO WATER AND GAS INJECTOR. Intervals treated (measured) MD-RKB TVD-RKB 9028-9038 6741-6750 RECEIVED Treatment description including volumes used and final pressure 14. .Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation I 19 155 51 8 1289 169 3052 230 1709 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service WATER INJ 7. I hereby certify that the foregoing is true and correct to the I~e~st of my knowledge. Si,ned ../~(..,~/'~, /~ Title Form 10-404 Re 06/15/88 ARCO inc. O '~' ~ Drillsite Morning Report ~----~ '-':' CPE r. Date_ I [ - ["l "- ~'7 . Time.._ ~/-"/O ~) Drillsite , ~. r~ Status Production Well Status Gas Lift Status Shut-In WellI P.T. or TP Choke Temp Last H2S CSG Pressure PSI Gas Inj. Rate" I # SI Zone PSI Bean OF WC% PPM 7" 10" Temp MeterTotal MSCFD Hrs Reason t3 iqO - ~0 0 1~ 11~0 qgO NO 37gqd qlq , ,,, Total ~ ~ ~ ~ Well Status Injection Well Status . Shut-In Gl, PW Inject. Pressure PSI Tern[: Choke CSG Pressure PSI Meter Injection Rate # or SW ZoneAllowable Actual°F Bean 7" 10" TotalBBLS/Day MMSCFD Hrs. iReason ~ itu,z-15 b~~ ~oo qq ~1 ~o~ :30  ~ ~11~ ~IIZ ~ ~ 200 0 I0~10~3 lq~ Total SWI Total {.g ~' Ii PWI Total ? E ~3 '~ ~; ~.~. L,-: ' )'-~ Drillsite Coil Temperature OF Coil Pressure PSI Bath Blanket~:' ~c,' ~' '~''~ .... ('ik~, ~& ~;~5 ~.u~b~i~ .................. Heater Prod Test Pr~ Test T~,,Gas PSI R~ Time ~ ~h~E~9 Gal/Day Headers Production Water Injection Gas Inj..,ection ~G'as Lift Drain Pressure ~ B ~ ~. ~ O 1 .~"'OO 1-8: Temperature [ 5 q '9-16: Comments Oper~.ter's Signature Tank: MeohlDiesel Level I Temp, I ARCO -.~ Inc. ~0' O .~..~ O Drillsite Morning Report ~.-..~ --~---~ CPF / Date_ I/- ~'-~ 7 Time. Z~o Drillsite /~ - Status Production Well Status Gas Lift Status·'' Shut-In - , Well P.T. or TP Choke Temp Last H2S CSG Pressure PSI Gas Inj. Rate # SI Zone PSI Bean °F WC% PPM 7" 10" Temp MeterTotal MSCFD Hrs Reason I I° ~ lace Z~I. . ~o 'Zl ?.,1 ..ieee 325 ~i"¢ 110198 '/-/f: ,~' · · .. Total 1 l, ~ ?S .. Status . Injection Well Status Shut-In Well Gl, PW Inject. Pressure PSI Temp Choke ;SG Pressure PSI Meter I Injecti°nRate # or SW 7one Allowable Actual OF Bean 7" 10" Total //J~l-e-.'l'o~li,~l~Z),~ Hrs. Reason I Total 13, SWI Total PWI Total Drillsite Coil Temperature °F Coil Pressure PSI Bath Blanket Heater Prod Test Prod Test Temp. Gas PSI Run Time In IiO 7~ / .T~ /7~ Out /&,o I~'G 12,8 /'/v zgz ;~. ~, z.,,¢' Chemicals Type I Gal/Day Headers } Production Water Injection Gas Injection Gas Lift Drain Pressure ] i..,-,-TO ' 'Z~oo i+~o 1-8: TemperatureJ I10 (~0 ~ 9-16: Comments ~---e,~_ _,J ,,,d 4 ..< c'~ 7.J dO Operater's Signature Y"~.~ ,Re' 0,4- Tank: MeohlOiesel Level Temp. ARCO Alaska, Inc Post office,,~,.,,.~ 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 May 2, 1988 Mr. C. V. Chatterton Alaska Oil and Gas Con~nission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Subject' Kuparuk River Field Water Injection Surveys In compliance with Rule 4 Conservation Order Number 198, Kuparuk River Field Waterflood Rules, we are hereby submitting injectivity surveys for Kuparuk water injection wells for the first quarter of 1988. The data is provided in the form of separate zone surveys as or spinner logs listed in Attachment I. The spinner logs will be sent separately. Injection rates determined by separate zone surveys are also listed in Attachment I. If you have any questions concerning' the information reported, please contact me at (907) 263-4978. Sincerely, ~4. H. Kraly Operations Engineer MHK/SPT:pg:0163 Attachments ARCO Alaska, Inc. II a Sublldlary of AllanllcfllchlleldCompany 3~ .--1o · s.c. ARCO Alaska, In Post Office~ox'~0360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 November 9, 1987 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton' Attached in triplicate listed below: is an intent notice on Kuparuk Well 1R-6 as Well 1R-6 Action Anticipated Start Date November 7, 1987 If you have any questions, please call me at 265-6840. Sincerely, Senior Operations Engineer GBS'pg'0123 Attachments cc' S. P. Twiggs AT0/1130 File KOE1.4-9 RECEIPTED NOV '""7 Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA AL/-t.~,.._~IL AND GAS CONSERVATION COr~?rvh,,...giON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other 2. Name of Operator ARCO Alaska., Inc 3. Address PO Box ]00360. Anchorage: AK 995]0 4. Location of well at surface 272_' FNL, 222' FEL. Sec.19, T12N, RIOE UM A[[op ofpro~luctive interval ~ 5. Datum elevation (DF or KB) RKB 84 4159' FNL, 3636' At effective depth 4339' FNL, 3901' At total depth 4376' FNL, 3925' 6. Unit or Property name Kuparuk River Unit 7. Well number 1R-6 8. Permit number Permit #85-71 9. APl number 50-- 029-21331 FEL, Sec. 19, T12N, RIOE, UM FEL, Sec. 19, T12N, RIOE, UM FEL, Sec.]9. T12N. RIOE. UM 11. Present well condition summary Total depth: measured 9303' ND feet true vertical6996, TVD feet 10. Pool Kuparuk RivPr 0il Pn(ll Plugs (measured~one feet Effective depth: measured 91RR' feet true vertical_-'-"-", ND feet 6890 TVD Casing Length Size XXXXe~L~kXXXX Conductor Surface XX X~t ~:~¢X~C[~te Production xxxx~Ste/xx xx Perforation depth: measured Junk (measured)None Cemented Measured depth True Vertical depth 110' 16" 215 SX CSII 110' MD 110' TVD 4659' 9-5/8" 1390 SX PF"E" & 4659' MD 3692' TVD 425 SX PF"C" 9279' 7" 510 SX CS G & 9279' MD 6976' TVD 250 SX PF"C" 8582'-8588', 8692'-8742', 8860'-8867', 8976'-8984' MD 8994'-9024', 9028'-9038' MD true vertical6378'-6382', 6463'-6502' , 6600'-6605' ,I~~,TVD 6713'-6738' 6741'-6750' TVD Tubing (size, grade and measured depth) o2qz" , 9.3#/Ft, J-55, tubing tail @ 8922 MD .~'~-~,._, _ ~'7 Packers and SSSV (type and measured depth) RnkPr FR-1 13 Rq?I' FIJI 0 RRqq'. r~rn~ TPl3D F~ 1907' Mr) 12.Attachments Description summary of proposal [] Detailed ~)~erations prograr~r~U'-'~l~'*C~ sketch [] Propose conversion from oil producer f.n watpr and 0a~ ~njector_ 13. Estimated date for commencing operation November 7, 1987 14. If proposal was verbally approved Name of approver /';~. /-~ O C)] ~' A..~ Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ,. (?~ /'~ 2/'~¢~c----r,~,, Title Sr. Operations Engineer Commission Use Only Notify commission so representative may witness .! Date11/4/87 Conditions of approval Approved by ~/', ~/. [] Plug integrity [] BOP Test [] Location clearance JApproval No. ........~'//' "_ ~-/C~_.~_..~.._ ~/ by order of ~ , , ~,omm~ss~oner the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate ARCO Alaska, Ir Post O ffice'~l~0360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215' Date: October 2, 1987 Transmittal #:6074 RETURN TO: ARCO Alaska, Inc. Attn: Kuparuk Records Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted herewith are the foliowing items. Please acknowledge receipt and return one signed copy of this transmittal. 3M-17 Kuparuk Well Pressure Report (Otis) 9-13-87 3M-20 Kuparuk Well Pressure Report (Otis) 9-15-87 3M-21 Kuparuk Well Pressure Report (Otis) 9-17-87 3M-22 Kuparuk Well Pressure Report (Otis) 9-16-87 IR-1 Kuparuk Fluid Level Report 8-22-87 1R-2 Kuparuk Flu~ Level Report' 8-22-87 1R-4 Kuparuk Well Pressure Report(Otis) 8-23-87 1R-6 Kuparuk Well' Pressure Report (Camco) 8-23-87 1R-8 Kuparuk FlUid'Level Report 8-22-87 1R-ii Kuparuk Well Pressure Report(Otis) 8-23-87 1R-13 Kuparuk Well PreSsure Report (Otis) 8-22-87 1R-14 Kuparuk Well Pressure Report ~tis) 8-21-87 1R-16 Kuparuk Fluid Level Report 8-22-87 ~_~ ,. .. ., ,, ~ Static Static Static 'A' Sand Static 'C' Sand 'C' Sand 'C' Sand Static ReceiPt Acknowledged: · DISTRIBUTION: Oil a,~ :Cons, Commission Anchorage_ D&M State of Alaska BPAE Chevron Mobil SAPC Unocal ARCO Alaska, Inc. Is a Subsidiary of AllanlicRIchfleldCompany ARCO Alaska, In, Posl Officc~rr6~-T00360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 Date: September 22, 1987 Transmittal #: 6062 RETURN TO: ARCO Alaska, inc. Attn: Kuparuk Records Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted herewith are the following items. Please acknowledge receipt and return one signed copy of this transmittal. 3C-I 3I-1 IR-4 1R-6 3C-14 3I-5 3M-16 3M-18 3M-19 · PBU Bottomhole Pressure Survey 'A' Sand Static BHP Bottomhole Pressure Survey Static BHP Bottomhole Pressure Survey 'A' Sand Static BHP Bottomhole Pressure Survey 'A' Sand PBU Bottomhole Pressure Survey. Kuparuk Well Pressure Report(Otis) 8-20-87 Kuparuk Well Pressure Report(Otis) Static 'C' Sand Kuparuk Well Pressure Report (Otis) Static Kuparuk Well Pressure Report (Otis) 8-15-87 8-27-87 8-20-87 8-21-87 8-16-87 50-029-21413 50-029-21407 50-029-21331 50-029-21425 9-7-87 9-14-87 9-14-87 Receipt Acknowledged: DISTRIBUTION: Date: D&M State of Alaska BPAE Chevron Mobil SAPC Unocal ARCO Alaska, Inc. Is a Subsidiary o! AllanlicRichfieldCompany ARCO Alaska, Inc. Post Office Bc..._~...~360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 December 9, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton. Attached in duplicate are subsequent notices following wells at the Kuparuk River Field' Well Action Date Performed 1B1 Frac 11/6/85 1 E8 Frac 1 2/6/85 1E-1 9 Convers ion 1 0/1 7/85 1E-21 Conversion 8/1/85 1E-23 Convers ion 1 0 ! 23 ! 85 1G-2 Frac 12/6/85 1R1 Frac 11/5/85 1R2 Frac 11/5/85 1R4 Frac 11/6/85 1R6 Frac 11/6/85 1R1 3 Frac 11/1 !85 1R1 4 Frac 11/1 !85 2D-5 Ac idi zed 6/1 8/85 2D-6 Ac idi zed 6!18/85 2V5 Convers i on 7/6/85 on the If you have any questions, please call T. M. Drumm Kuparuk Operations Coordinator TMD/kmc Attachment (Duplicate) me at 263-4212. ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany 1 o J.9 5 Alaska Oil & Gas Co,-,s. Commission ..._~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION C03~11911SSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL I~ OTHER [] 7. Permit No. 2. Na~,°coP"~,I~S KA,'"--'" °"*"" INC. 8 5 - 71 8. APl Number 3. Address O BOX 1 0 036 0 ANCHORAGE ALASKA 9951 0 50- 029- 21 331 · · · · 9. Unit or Lease Name KUPARUK RIVER UNIT 4. Location of Well SURFACE LOCATION' 272' FNL, 222' FEL, SEC. 19, T12N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 84' (RKB) 6. Lease Designation and Serial No. ADL 25635, ALK 2568 10. Well Number 1R-6 11. Field and Pool KUPARUK RIVER FI ELD KUPARUK RIVER OIL POOL 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation {~ Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). On November 6· 1985· the "A" sands of Kuparuk well 1R-6 were hydraul ical ly fractured and propped to improve production. The treatment consisted of 182 BBLS of gel led diesel as pad and carrying fluid and 750# of 100 mesh and 10,250 of 20/40 sand as proppant. 63 BBLS of gel led diesel was used as a flush. Prior to pumping· equipment and lines were tested to 7900 psi. 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ..~,/~o-~,~ ~---~-~*~-- Tit,e KUPARUK The space below for Commission use ~OI:'D ^'1- ~ r~l~ ,",r~r'~r~ ] ~,~ ^'-~t'~r~ conditions of Approval, if any: Date 1 2 / ~ / 85. Approved by By Order of COMMISSIONER the Commission Date Form 10403 Rev. 7-1-80 Submit "1 ntentions" in Triplicate and "Subsequent Reports" in Duplicate RL?Ui414 TO: ARCO Alaska. Inc Post Offic 100360 Anchorage. Alaska 99510-0360 Telephone 907 276 1215 ARCO ALASKA, I[JC. KU P?..L{U K OPE kA?iOI~S RECORDS CLERK ATO-!llS~ P.O. ~0:{ 1003~0 A~ChO~AGi-;, A.K 99510 -DA?E: 10-15-85 i't{A[{SbilTTZ6. ~;O: 5399 i' k'lN Sb: I'='!' LD IlERL';; I'Bt! ~,ECETFT ,~hD kEk'g~-d{ O[~'~ CLL/CET ~"I;JAES/ SChL/ O~'~s * O? -' iU-i4 ~ Cba/VhL 06-02-85 !{UH ~!~i- 6 / ChL/VDL 0t-0~-85 i~U~ 2V-!4 /CsL/VDL 00-02-85 i{Uh x3b-6 ~ CSL/VDL 0o-01-85 RUN ~3~-7/ CL.L/VDL u6-05-S5 ~U ~-~ - 3~-!0w CE? LOG 06-30-85 RU[~ FOLLO%~i[~G I?SkS. PLEASE ACR['qO;IL~£DGE -- 1Tp ) i ; ,,._' .' t r~,m- · COPY 0[' '2h±S 'i.e~.~onI.zaL 5900-8871 6140-9146 5090-7056 5500-7990 5900-8656 "4690-7120 4¥40-7137 :-:ECE I P'i' .:~CRi40¥,.' LEDGED - ARCO Alaska. Inc. ~$ 3 SuDs;d,a~¥ of AllanhcR~chheldCompany ARCO Alaska, Inc. Post Office B~1~0360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 October 9, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 1R-6 Dear Mr. Chatterton' Enclosed is a copy of the 1R-6 Well History (completion details) to include with the Well Completion Report, dated 8/5/85. If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/lt GRU12/L11 Enclosure cc' 1R-6 Well File ARCO Alaska, Inc. is a Subsidiary of AllanticRichfieldCompany ARCO Oi~nd Gas Company Daily Well History-Final Report Inslructione: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged. Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinile or appreciable length of time. On workovers when an official test is not required upon completion, report completion and re'presentative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. District JCounty or Parish Alaska I North Slope Borough Field ~Lease or Unit Kuparuk River I ADL 25635 Auth. or W.O. no. ~Title AFE 604569 I Completion Nordic 1 Operator ARCO Alaska, Inc. Accounting cost center code State Alaska IWell no. 1R-6 Spudded or W.O. begun Complete Date and depth as of 8:00 a.m. API 50-029-21331 A.R.Co. W.I. [rotal number of wells (active or inactive) on this 56.24% cost center prior to plugging and / abandonment of this well I Date Hour l Prior status if a W.O. 6/29/85 0015 hrs. I Complete record for each day reported to crude. Set SSSV @ 1908' ~JO~', set "D" npl @ 8924'. J-55 EUE 8rd IPC tbg. 6/29/85 thru 7/01/85 7/02/85 7" @ 9278' 9188' PBTD, Displ'g w/Crude 7.2 Brine Accept Rig @ 0015 hrs, 6-29-85. NU BOPE& tst. RIH w/3½" tbg to spot lost circ pill. RIH w/3~" tbg. Spot kill pill across perf interval. RU WL. RIH w/4" csg guns, 4 SPF, 90° & perf f/9038'-9028', 9024'-8994', 8984'-8976'. RIH w/5½" csg guns, 12 SPF, 120° & perf f/8867'-8860', 8742'-8692', & 8588'-8582' RIH w/WL pkr & tail pipe assy. RIH w/3½" compl string, Set pkr, spear PBR. Set BPV, ND BOPE, NU tree & tst. Displ well , ret pkr @ 8435' , perm pkr @ Rn 276 jts of 3½" compl, 9.3#, 7" @ 9278' 9188' PBTD, RR Crude Jll~- Displ well to crude, tst SSSV. Set BPV. RR @R-~-hrs, 7-1-85. Old TO New TD Released rig { I J ~ Date ~ hrs. Classifications (oil, gas, etc.) 0il Producing method Flowing Potential test data I PB Depth Kind of rig 7/1/85 Type completion (single, dual, etc.) Single Official reservoir name(s) Kuparuk Sands 9188' PBTD Rotary Well no. Dale Reservoir Producing Interval Oil or gasTeat time Production . Oil on test Gas per day Pump size, SPM X lenglh Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected ~hgen ab°ye i~'c°rlecl k'\ ~ Date// IT,t,e For form preparation and distribution, see Procedures Manual. Section 10, AR3B-459-3-C Number all daily well history forms consecutively as they are prepared for each we . Page no. 1 Division of AllantlcRichfteldCompany ARCO Alaska, Inc. Post Office B~....~0360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 September 10, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Attached in duplicate are subsequent notices following wells at the Kuparuk River Field: Well Action Date Performed 1Q-2 Fracture 9/1/85 1Q-3 Fracture 9/1/85 1R-5 Acidize 8/23/85 1R-6 Acidize 8/24/85 1R-9 Fracture 8/27/85 1R-10 Fracture 8/26/85 1R-11 Fracture 8/26/85 1R-12 Fracture 8/27/85 2C-9 Perforate 8/26/85 2Z-1 Fracture 8/19/85 2Z-2 Perforate 8/25/85 2Z-2 Fracture 9/2/85 2Z-3 Fracture 8/19/85 on the If you have any questions, please ~ M. Drumm Kuparuk Operations Coordinator TMD/kmc Attachment (Duplicate) call me at 263-4212. RECEIVED SEP ! Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AilanticRichfieldCompany STATE OF ALASKA ALASKA Old'AND GAS CONSERVATION COI~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL ~ OTHER [] 7. Permit No. 2. m~)Op~r[t~rs KA, I N C. 85 - 71 8. APl Number 3'A~d~esso. BOX 100360, ANCHORAGE, ALASKA 99510 5o-029-21331 9. Unit or Lease Name KUPARUK RIVER UNIT 4'L~3cot~NI~"LOCATION' 272' FNL, 222' FEL, :SEC. 19, T12N, R10E, UM 5. Elevation in feet, (indicate KB, DF, etc.) 84' (RKB) 6. Lease Designation and Serial No. ADL 25635, AL K 2568 10. Well Number 1R-6 11. Field and Pool KUPARUK RIVER FIELD KUPARUK RIVER OIL POOL 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation X~] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). On August 24, 1985, the "C" sands of Kuparuk well 1R-6 were acidized to improve production. The treatment consisted of 30 BBL of 12% HCL. Diesel was used for flushing and nitrogen to aid well cleanup. Prior to starting job, equipment was pressure tested to 4000 psi. RECEIVED S E P i .3 i 85 Alaska Oil & Gas Cons. Commission Anchorage. 14. l hereby certify that the foregoing is true and correct to the best of rr~'L~)o]~v~Ljg~ The space below for Commission use Conditions of Approval, if any: C00RDTNATO~ 9/9/85 Date Approved by By Order of COMMISSIONER the Commission ' Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, I[ Post Office~e ~ 100360 Anchorage. Alaska 99510-0360 Telephone 907 276 1215 DATE: 08-21-85 TRANSMITTAL NO: 5296 RETURN TO: ARCO ALASKA, INC. KUPARUK OPERATIONS ENGINEERING RECORDS CLERK ATO-1115B P.O. BOX 100360 ANCHORAGE, AK 99510 TRANSMITTED HEREWITH ARE THE FOLLOWING ITEMS. PLEASE ACKNOWLEDGE RECEIPT AND RETU~q ONE SIGNED COPY OF THIS TRANSMITTAL. SEQUENCE OF EVENTS FROM WELL SERVICE REPORTS PRESSURE DATA "~iC- 4 '- 07-23-85 '-~ 1C-5 ' 07-29-85 '~1C-5,-- 07-30-85 '~1C-6 ~ 07-25-85 "'-lC- 6 ' 07-24-85 ~lD-8 -' 07-30-85 --~ 1H- 3' 07-30-85 ----1R-5 07-05-85 -"-1/{-6' 07-06-85 ~'- lB-8 07-U8-85 1Y-10- 07-27-85 1Y-11~ 07-28-85 2A-2 .° 07-04-85 2~-13' 07-30-85 2U-14' 06-30-85 2U-14" 07-01-85 2U-15' 07-08-85 2V-2 07-27-85 2V-2 07-28-85 2W-7- 07-26-85 ~2W-7 ' 07-27-85 2X-15 ' 07-09-85 2X-15" 07-U4-85 2Z-l- 07-05-85 ~-2Z-6' U4-08-85 "3B-7 ~ 06-27-85 3B-8~ 06-28-85 3B-8~ 06-27-85 '~3B-9 -~' ~7-18-85 3B-11 07-20-85 3B-12' 07-21-85 3C-11 -' 07-29-85 STATIC BHP PBU PSU STATIC BHP STATIC BHP STATIC BHP STATIC BHP DHP & MISC. BHP & MISC. STATIC BHP & I~ISC. STATIC BHP END OF PBU 'C' SAND STATIC BHP Pf{E SS UR3S DATA 'A' SAND PBU 'A' SAND PBU PRESSURE TEST & 'A' SAND PBU 'A' SAND PBU 'A' SAND ONLY PBU 'A' SAND PBU FLO%~ING BHP & FLUID I.D. FLOWING BHP & TEMPERATURE BBP SURVEY & MISC. STATIC BHP STATIC BHP & MISC. STATIC BHP & MISC. BHP & MISC. STATIC BHP & MISC. BHP SURVEY & MISC. STATIC BHP & MISC. STATIC BHP ,~ MISC. RECEIPT ACKNOWLF. DGED: BPAE* B. CURRIER CHEVRON* D & ~* DISTRIBUTION: DRILLING W. PASHER L. JOHNSTON EXXON MOBIL* PHILLIPS OIL* NbK CLERK J. RATHMELL* ' ARCO Alaska. Inc. is a Subsidiary of AtlanticRichlieldCompany CAMCO DRESSER ATLAS DRESSER ATLAS CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO DRESSER ATLAS OTIS OTIS OTIS OTIS OTIS OTIS OTIS OTIS OTIS OTIS OTIS OTIS CAMCO CAMCO OTIS CAMCO CAMCO CAMCO CAMCO %_,,-" DAT~-~sk~ p. ~ ~ ..... uuo. COSl~JSSJoD STATE OF "~L'A~SKA* SOHIO* UNION* K.TULIN/VAULT ARCO Alaska, I~,~ Post Office'~' ~x 100360 Anchorage. Alaska 99510-0360 Telephone 907 276 1215 DATE: 08-21-85 TRANSMITTAL NO: 529 2 KETUP~q TO: ARCO aLASKA, INC. KUPARUK OPERATIONS ENGINEERING RECORDS, CLERK ATO-1115B P.O. BOX 100360 ANCHORAGE, AK 99510 TRANSMITTED kkCEIPT AND KUPARUK ' lB-1. lB-2. 05-30-85 '~lB-4. 05-16-85 '- 1C-4 07-24-85 1C-6-' 07-25-85 ~' 1D-8-~ U7-30-8 5 --1H-3 "-07-30-85 ~ lQ-13~''' 06-24-85 "lQ- 14-~ 06-23-85 ~'iQ-15'~ 06-21-85 "lQ-16? 06-21-85 1R-5'~- 07-05-85 1R-6-'~ 07-06-85 .- ~lR-71 07-06-85 "1R- 8 ' 07-08-85 ~2A-2-' ' 07-04-85 --2W-7- 07-26-85 ~2V-3 07-11-8 5 ~-2W- 15" 08-04-85 3B-t 06-14-85 3B-21--" 06-14-85 - 3B-3"' 06-28-~5 "3B-3' 06-15-85 ~3B-4-' 06-15-85 ~3B-5 --' 06-26-85 '3B-6~- 06-26-85 --3B- 7" 06-28-85 3B-7-~ 06-27-85 3B-8~ 06-28-85 -3B-9~' 07-18-85 ~3B- 10-" 07-20-85 ~-3B-11 -- 07-20-85 3B-12 .... 07-21-85 3B-13- 05-29-85 -3B-14 05-29-85 RECEIPT ACKNOWLEDGED: BPAE* B. CORKIER CHEVRON* D & M* HEREWITH ARE THE BLETURN ONE SIGNED COPY OF THIS TRANSMITTAL. WELL PRESSURE REPORT--ENVELQPE FACE DATA 05-30-U5 CAMCO '~3B-15 FOLLOWING ITEMS. PLEASE ACKNOWLEDGE CAMCO 3B-16--'-- CAMCO ~ 3C- 11~ '- CAMCO CAMCO CAMCO C~CO CAMCO CAMCO CAMCO C~ICO CAMCO CAMCO CAMCO CAMCO OTIS DRESSE~ OTIS OTIS CAMCO OTIS CAMCO CAMCO CAMCO CAMCO CAMCO C~ICO OTIS CAMCO C~]CO CAMCO CAMCO OTIS OTIS 05-28-85 OTIS 05-28-85 OTIS 07-29-85 CAMCO DISTRIBUTION: DRILLING W. PAShER L. JOHNSTON EXXON t,13B IL* PHILLIPS OIL* NSK CLERK J. RATHMELL* STATE OF ALASKA* SOH I O* UNION* K.TULIN/VAULT ARCO Alaska. Inc. ~s a Subsidiary of AtlanticRichfieldCompany ARCO Alaska, Inc. Post Office B0~-,.~.00360 Anchorage, Alaska 99510 Telephone 907 276 1215 August 13, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 1R-6 Dear Mr. Chatterton' Enclosed is a Well Completion Report for the subject well. I have not yet received the Well History (completion details). When I do, I will forward a copy to you. If you have any questions, please call me at 263-4944. Sincerely, . Gruber Associate Engineer JG/tw GRU10/L116 Enclosure RECEIVED Alasl(a 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanlicRichfieldCompany - " STATE OF ALASKA ALASKA t~AND GAS CONSERVATION CC,~.~iSSlON WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL I~x GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. . 85-71. 3. Address 8. APl Number P. 0. Box 100:360, Anchorage, AK 99510 50- 029-21:331 · ., 4. Location of well at surface 9. Unit'or Lease Name 272' FNL, 222' FEL, Sec.19, T12N, R10E, UM Kuparuk River Unit At Top Producing Interval 10. Well Number 4159' FNL, :3636' FEL, Sec.19, T12N, R10E, UM 1R-6 At Total Depth 11. Field and Pool 4376' FNL, :3925' FEL, Sec.19, T12N, R10E, UM Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Kuparuk River 0i l Pool 84' RKB ADL 256:35 ALK 2568 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions 05/05/85 05/1:3/85 05/15/85' N/A ,.t MSLI 17. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19, Directional Survey t 20. Depth where SSSV set i 21.Thickness of Permafrost 9:30:3'MD,6996'TVD 9188'MD,6890'TVD YES I-~X NO [] 1908 feet MD 1550' (Approx) 22. Type Electric or Other Logs Run FDC/CNL/Cal , D IL/SFL/SP/GR, Cal/DIL/GR, FDC/CNL, Gyro (GCT), CBL/GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSlZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# H-40 Surf 110' 24" 215 sx CS II 9-5/8" 36.0# J-55 Surf 4659' 12-1/4" 1390 sx Permafrost E & 425 sx Permafrost C 7" 26.0# J-55 Surf 9279' 8-1/2" 510 sx Class G & 250 s; Permafrost C 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 8976' - 8984' 3-1/2" 8932' 8435' & 8909' 8994' - 9004' w/4 spf, 90° phasing 9004' - 9024' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9028' - 9038' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED N/A 8582' - 8588' 8692' - 8742' w/12 spf, 120' phasing 8860' - 8867' 27. N/A PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD I~ Flow Tubing Casing Pressure CALCULATED.1~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None RECEIVED AUG Alasl<a 0il & Gas Cons. C0rnmissJ0r, Anch0ra.~e Form 10-407 * NOTE: Tubing was run and the well perforated 7/1/85. TEMP/WC69 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE , ::'-., ,.....~ .. : GEoLoGi~'MAR'i~-~R'~ i~i~i,:.~'. !,i7 ~" ..t~::. ::.:-~:.~..':.' ;5.;?~'i..~i.?~?~::;.'~ · . · . NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH . GOR, and time of each phase· .. Top Upper Sand 8581' ' 6376' N/A --' Base Upper Sand 8740' 6502'. Top Lower Sand 8958' 6682' : ::' - - :. :' :- ' '.:" -,:, .- Base Lower Sand 9088' 6798' ... ' :i o..- ~ ;' , : - : - · . . · -:.-- . : _; -- .: 31. LIST OF ATTACHMENTS : 32. I hereby certify that the foregoi,ng is true and ,correct to the best of my knowledge -: INSTRUCTIONS General: This form is designed 'for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injectiOn, air injection, salt water disposal, water supply for injection, observatiOn, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 ARCO Alaska, Inc. Post Office Be ~0360 Anchorage, Al~'~a 99510-0360 Telephone 907 276 1215 August 15, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Attached are our notices of intention to field wells 1R-5 and 1R-6, If you have any questions, please call me at acidize Kuparuk 263-4212. T. Mark Drumm Kuparuk Operations Coordinator TMD / kmc Attachment (In Triplicate) ARCO Alaska, Inc. is a Subsidiary of AllanticRichfieldCompany STATE OF ALASKA ALASKAt::r~E AND GAS CONSERVATION cO~ISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator ARCO ALASKA, I NC. 3. Address P. O. BOX 100360, ANCHORAGE, ALASKA 99510 OTHER [] 4. Location of Well SURFACE LOCATION. 272' T12N, R10E, UM FNL, 222' FEL, SEC. 19, 5. Elevation in feet (indicate KB, DF, etc.) 84 ' (RKB) 12. 7. Permit No. 85-71 8. APl Number 50- 029-21331 9. Unit or Lease Name KUPARUK RIVER UNIT 10. Well Number 1R-6 11. Field and Pool KUPARUK RIVER FIELD 6. Lease Designation and Serial No. KUPARUK RI VER O ! L ADL 25635, ALK 2568 POOL Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate ~ Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing [] [] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). It is proposed that the "C" sand in Kuparuk well 1R-6 be acidized to improve production. The treatment will consist of 30 BBLS of 12% HCL with MSR.. The acid is to be pumped by coil tubing nitrogen to aid well cleanup. Prior to be pressure tested to 4000 psi. unit and displaced with starting work, equipment will Fluid Requirements- 30 BBLS 12% HCL w/MSR 100 BBLS Diesel ANTICIPATED START DATE- AUGUST 18, Work ~eportett ' 1985 RECEIVED Alaska Oil & Gas Cons. CommisSion Anchoracje 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. KU PARU K Signed Title OPEP.~.-F. ! Obis COORDI NATOR The space below for Commission use Date 8/15/85 Conditions of Approval, if any: Approved by COMMISSIONER ~lCproved Co¢~ R~turn~,d By Order of the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, In~ Post Office Bo~00360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 DATE:07-23-85 TRANSMITTAL NO:5274 RETURN TO: ARCO ALASKA, INC. KUPARUK OPERATIONS ENGINEERING RECORDS CLERK ATO-1115B P.O. BOX 100360 ANCHORAGE, AK 99510 TRANSMITTED HERE~ITH ARE THE FOLLOWING ITEMS. PLEASE ACKNOWLEDGE RECEIPT AND RETURN ONE SIGNED COPY OF THIS TRANSMITTAL. FINAL PRINTS/SCHL OPEN HOLE (ONE * OF EACH) 1R-8 5" DIL/SFL-GR 06-14-85 RUN $1 4045-8547 2" DIL/SFL-GR 06-14-85 RUN $1 4045-8547 5" DEN/NEU PORO 06-14-85 RUN #1 4045-8521 -'""- 2" DEN/NEU PORO 06-14-85 RUN ~1 4045-8521 5" DEN/NEU RAW 06-14-85 RUN ~1 4045-8521 2" DEN/NEU RAW 06-14-85 RUN #1 4045-8521 CYBERLOOK 06-14-85 RUN $1 7620-8498 1R-6 5" DIL/SFL-GR 2" DIL/SFL-GR 5" DEN/NEU-GR PORO 2" DEN/NEU-GR PORO 5" DEN/NEU-GR RAW 2" DEN/NEU-GR RAW CYBERLOOK 05-14-85 RUN #1 4656-9277 05-14-85 RUN ~1 4656-9277 05-14-85 RUN #1 4656-9256 05-14-85 RUN #I 4656-9256 05-14-85 RUN #1 4656-9256 05-14-85 RUN #1 4656-9256 05-14-85 RUN #1 8360-9233 RECEIPT ACKNOWLEDGED: BPAE B. CURRIER CHEVRON D & M*BL DRILLING*BL L. JOHNSTON MOBIL NSK CLERK*BL DISTRIBUTION: W. PASHER EXXON PHILLIPS OIL J. RATHMELL*BL DATE: A~a__L,i_ ~__L~'.,._c~.~..__C_~lmission ' /:mch.~ra~e STATE OF ALASKA*BL SOHIO /SE UNION K. TULIN/VAULT* FILM ARCO Alaska. Inc. is a Subsidiary of AIlanticRichHeldCompany ARCO Alaska, Inc. Post Office B~_..~0360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 July 30, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Attached in duplicate are subsequent following wells at the Kuparuk River Field: Well Action Date Performed 1G-2 Acidize 7/12/85 1R-5 Fracture 7/16/85 1R-6 Fracture 7/19/85 1 R-7 Fracture 7 / 17 / 85 1 R-8 Fracture 7/17/85 2D-7 Acidize 6/21/85 2D-8 Acidize 6/21/85 2H-3 Acidize 6/21/85 2H-13 Fracture 7/23/85 2 X-5 Perforate 7 / 23 ! 85 3B-1 Acidize 7/22/85 notices on the If you have any questions, please call me at 263-4212. T. M. Drumm Kuparuk Operations Coordinator TMD/kmc Attachment (Duplicate) £CEI VED A o Z985 ~, .Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichlieldCompany STATE OF ALASKA ALASKA OI~AND GAS CONSERVATION CO~rlVIlsSION SUNDRY NOTICES AND REPORTS ON WELLS 1. 2. Na,~ep~,a~SKA' INC. 3. Address O BOX 1 00360 DRILLING WELL [] COMPLETED WELL E~[ OTHER [] 7. Permit No. 85-71 8. APl Number ANCHORAGE, ALASKA 9951 0 50- 029- 21 331 9. Unit or Lease Name FEL, SEC. 19, KUPARUK RIVER UNIT 10. Well Number 1R-6 11. Field and Pool KUPARUK RIVER FIELD 5. Elevatior~i~ ~eet ti~c~c~3t~ KB, DF, etc.) I 6. LeaSeABEDesignation25635,and serialAuKNO. 2568 KUPARUKpooL RIVER O I k 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data 4. LoEr~~~ LOCATION' 272' FNL, 222' T12N, R10E, UM NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation )J~ Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). On July 19, 1985, the "A" sands of Kuparuk well 1R-6 were hydraulical ly fractured and propped to improve production. The treatment consisted of 278 BBLS of gel led diesel as pad and carrying fluid and 1000 LBS of 100 mesh and 10,920 LBS of 20/40 sand as proppant. 77 BBLS of gel led diesel was used as a flush. Prior to pumping, equipment and lines were tested to 8000 psi. RECEIVED AUO o Alaska 0il & Gas Cons. C0rnrniss/0n Anchorage 14.1 hereby certify that the foregoing is true and correct to the best of n~0r~t~k ~./~g~.~__ (~~ Title OPERAT IONS COORDI NAT(3R Signed The space below for Commission use Date 7/29/85 Conditions of Approval, if any: Approved by COMMISSIONER By Order of the Commission Date Form 10-403 Rev. 7-1430 Submit "1 ntentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Al' , Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 DATE: 06-27-85 TRANSMITTAL NO:.5235 URN TO' ARCO ALASKA, INC. KU PARUK OPERATIONS RECORDS CLERK ATO-!!iSB P.O. BOX 100360 ANCiiORACE, AK 99510 ENGINEERING HE.RD.'JITI[ ARE ,~r.,v ~,a FOLLOWING ITEMS. · '," ;i,1 m RETURN ONE SIGNED COPY OF THIS T~NSM~_~AL TAPES PLUS LISTING (ONE COPY OF EACH) TRANSMITTED RECEIPT AND OPEN [!GLE LIS s'c ~i n u>~,~ Z~GER 3C-i2,~ 06-~6-~5 RUN ~ 375~.0-7598.0 3s-a~ oo-o2-85 RUN ~1 3925.5-8516.0 3B-7~ 05-24-85 RUN ~1 3268. 0-7310.5 3B-9~ 06-10-85 RUN ~1 3988.0-8415.0 ~m-5~ 05-1o-85 RUN ~1 3g~7 5-8148 0 2Z-!6~ 06-08-85 RUN 91 4062.5-8163.5 2V-16 ~ 06-0 3-~5 RUN ~! 2973.0-7168.0 2V-15~ 05-24-35 RUN ~2 2873.0-6544.5 2V-14 ~ 05-16-85 RUN ~1 3047.0-7086.5 2V-13 ~ 05-07-85 RUN ~! 3536.5-8710.5 !R-O~ 06-14-85 RUN ~1 4040.5-8576.5 1R-6~ 05-14-85 RUN ~! 4623.5-9332.5 JQ-15~ 05-12-85 RUN ~! 4390.5-8730.0 iQ-14 ~ 05-21-85 RUN ~1 4371.0-9027.5 iQ-13~ 05-30-~5 RUN ~1 3679.0-7772.5 PLEASE ACKNOWLEDGE 03-18-85 RUN ~1 4570 0-9471 0 REF #70506 *ILEV!SED* LQ-4 ~.~ . . PAE DRILLING CUi.-q~Zi' L. JOHNSTON S bl NSK CLERK DiSTRIBUTiON' ~;'.! PAS ...... P[:ILLI ?S OIL J. DC~THMELL Gas Cons. ~ch,0rags DATE - $Oi!iO UNION K . TULIN/,r~ ,-:~ ~ REF :~70547 REP ~70495 REF #70468 REF #70526 REF =704i7 REF #70525 REF ~70496 REF #70470' REF ~70426 REF #70409 REP' i~70546 REP 070422 REF ~70415 REF #70447 REF ~70482 ARCO Alaska, Inc. Post Office Bb..~100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 July 3, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 1R-6 Dear Mr. Chatterton' Enclosed are the Well Completion Report and gyroscopic survey for the subject well. The tubing details will be submitted when the well has been completed. If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRUiO/L50 Enclosures RECEIVED JUL 1 0 ! tt§ Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany .. . STATE OF ALASKA ALASKA .-~..~AND GAS CONSERVATION CO.._..,ISSlON WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [~X ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 85-71 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21331 4. Location of well at surface 9. Unit or Lease Name 272' FNL, 222' FEL, Sec.19, T12N, R10E, UM jLOCATIONS Kuparuk River Unit, At Top Producing Interval I VERIEJ~ED 10. Well Number 4159' FNL, 3636' FEL, SEC.19, T12N, R10E, UM Surf.,/~, _ 1R-6 H._~.___ 11. Field and Pool At Total Depth ~B. r 4376' FNL, 3925' FEL, Sec.19, T12N, R10E, UM Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Kuparuk River 0i 1 Pool 84' RKB ADL 25635 ALK 2568 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions 05/05/85 05/13/85 05/15/85 N/A feet MS LI N/A 17. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19. DirectionalSurvey I 20. Depth where SSSV set i 21. Thickness of Permafrost 9303'MD,6996'TVD 9188'MD,6890'TVD YES []X NO [] N/A feet MD 1550' (Approx) ~2. Type Electric or Other Logs Run FDC/CNL/Cal, D IL/SFL/SP/(]R, Cal/DIL/(]R, FDC/CNL, (lyre ((]CT) 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE ' TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# H-40 Surf 110' 24" 215 sx CS II 9,5/8" 36.0# J-55 Surf 4659' 12-1/4" 1390 sx PermafroSt E & 425 Sx'Permafrost C 7" 26.0# J-55 Surf 9279' 8-1/2" 510 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None N/A 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR :OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATEDi~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE IF 28. CORE DATA , Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None RECEIVED Alaska. 0il & Gas Cons. Commission Anchorage Form 10-407 (]RUlO/WC06 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE _ . . . NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase: ' · - .. Top Upper Sand 8581' ,. 6376' N/A ' Base Upper Sand 8740' 6502' Top Lower Sand : .8958' 6682' ..... Base Lower Sand 9088' 6798' ~ .! :. '- ,. , _ .. . ;. . . . 31. LIST OF ATTACHMENTS Gyroscopic Survey .f2 copies). · 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. . · , : Signed //~-0 ¢,,~ ~-L)~/t~'~ Title Associate Engineer Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL)or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Fnrm 1Cl~.g7 ARCO Alaska, Inc. Post Office B0~-"r00360 · Anchorage, Alaska 99510-0360 Telephone 907 276 1215 June 21, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' 1R-6 Dear Mr. Chatterton' Enclosed is a copy of the 1R-6 Well History to include with the Well Completion Report, dated 05/30/85. If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU9/L98 Enclosure cc' 1R-6 Well File RECEIVED J U N 2 ~ ~85 Alaska Oil & Gas Cons, Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ARco Oil and Gas Company,~, Well History- Initial Report- Daily Inetructlona: Prepare and submit the "Initial Report" on the first Wednesday after a well is spudded or workover operations are started. Daily worl( prior to spudding should be summarized on the form giving inclusive dates only. North Slope Borough IState Alaska IWell no. District Alaska IC°unly'parish or borough Field ILease or Unit Kuparuk River ADL 25635 Auth. or W,O. no, ITM AFE 604569 I Drill Doyon 9 Operator API 50-029-21331 IARCO W.t. Prior status if a W.O. ARCO Alaska, Inc. Spudded or W.O. begun Spudded Date and depth as of 8:00 a.m. 5/06/85 5/07/85 5/08/85 5/09/85 Data 5/5/85 Complete record for each day reported Hour 1045 hrs. 16" @ 110' 2108', (1998'), Drlg Wt. 9.7, PV 24, YP 18, PH 8.5, WL 13.2, Sol 10 Accept rig @ 0800 hrs, 5/5/85. NU diverter sys. 1045 hrs, 5/5/85. Drl 12¼" hole to KOP @ 711'. 1572', POH, chg BHA. RIH & rotary drl to 2108'. 859', 4.4°, S26.6W, 859 TVD, 5 VS, 5S, 3W 1198', 13.7°, S39.5W, 1193 TVD, 59 VS, 50S, 33W 1512', 21.2°, S34.5W, 1492 TVD, 153 VS, 127S, 87W 16"'@ 110' 4600', (2492'), Drlg Wt. 9.9, PV 26, YP 18, PH 8.5, WL 10.8, Sol 10 Drl & surv 12¼" hole to 4600'. 1928', 29.9°, S33.1W, 1869 TVD, 327 VS, 271, 189 2430', 45.2°, S31.5W, 2267 TVD, 629 VS, 529, 348 2684', 51.3°, S32.SW, 2434 TVD, 817 VS, 690, 451 3336', 55°, S36.3W, 2798 TVD, 1352 VS, 1130, 764 3787', 47.6°, S41.1W, 3085 TVD, 1698 VS, 1400, 983 4287', 43°, S43.2W, 3436 TVD, 2054 VS, 1663, 1223 .Spud well @ KO & DD to 9-5/8" @ 4659' 4573' PBTD, (0'), NU BOPE Wt. 9.8, PV 25, YP 17, PH 8.5, WL 10.8, Sol 10 Drl 12¼" hole to 4678', short trip, C&C hole, TOH. RU & rn 111 its, 9-5/8", 36#, J-55 BTC csg to 4659', CBU. M&P 1390 sx PF "E" & 425 sx PF "C". Circ cml to surf. Bump plug. ND diverter. NU starting head. 4538', 42.8°, S42.4W, 3618 TVD, 2223 VS, 1786S, 1339W 4622', 41.9°, S43.8W, 3682 TVD, 2281VS, 1829S, 1378W 9-5/8" @ 4659' 6139' (1461'), Navi-Drl Wt. 8.8, PV 6, YP 8, PH 9.5, WL 11.2, Sol 4 Tst BQPE. TIH-to FC. @ ~573', ts.t csg to 1500 psi. DO cml & flt equiP +.10' new foi-ma-tion'to 4688'; Cond~t'leak-off--tS~ to i2.5 ppg EMW: Drl 8½" hole to 613'9'. - 4813', 44.4°, S44W, 3821.38, 2409.7~,-1923.08S, i468.91W 5541', 48.9°, S44.2W, 4314.57, 2944.69, 2304.72S, 1844.21W 5951', 48.4°, S43.9W, 4585.44, 3252.37, 2525.93S, 2058.21W RE'CE VED 56.24% The above is correct Signature ~,j~l~ ~,,~~ For form preparatlon"-an-d distribution, (2 see Procedures Manual, Section 10, Drilling, Pages 86 and 87. Date 6/12/85 ITitle Dr i~.~,~a$ ~pe r iht end ent ARCO Oil and Gas Company Daily Well History--Interim Inslrucflona: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative lest on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ until completion. District ICounty or Parish IState Alaska North Slope Borough Field JLease or Unit Kuparuk River I ADL 25635 Complete record for each day while drilling or workover in progress Date and deptl~ as of 8:00 a.m. 5/10/85 5/11/85 thru 5/13/85 5/14185 5/15/85 The above is correct Signature For form prepar~'~o~ an~"distr~b~tToilr see Procedures Manual Section Drilling, Pages 86 and 87 Alaska JWell no. 1R-6 9-5/8" @ 4659' 8056' (1917'), Drlg Wt. 9.8+, PV 15, YP 17, PH 9.5, WL 9.4, Sol 12 Drl & surv 8½" hole to 8056'. 6264', 48.1°, S43.5W, 4793.86, 3485.85, 2694.76S, 2219.54W 6670', 48.2°, S43.2W, 5063.29, 3789.51, 2914.59S, 2429.10W 7110', 46.9°, S41.7W, 5358.07, 4116.14, 3154.31S, 2650.95W 9-5/8" @ 4659' 9303', (1247'), Short trip Wt. 10+, PV 18, YP 12, PH 9.0, WL 6.0, Sol 14 Drl 8½" hole f/8056'-8994' w/hi rotary torque. Treat mud to reduce torque. LD 3 jts DP & rm 8865'-8994'; could not rotate on btm. POOH 15 stds, could not rotate. At 33 stds off btm, rotating-freely. Fin TOH, lost 1 cone on-bit & most inserts ' broken off.' PU bit & 7" JB, RIH, could rotate 17 stds off btm w/40-90 RPM. Rm 45' to btm w/hi torque; could not rotate on btm. Pmp pill, POOH 9 stds, LD 27 its DP. Rm back to btm w/hi torque. Mill on junk @ 8994' & drl 8½" hole f/8994'-9000', C&C mud, POH. Rec'd cup full of inserts & pieces of cone. PU new bit, R-IH, wsh f/8994'-9000' & drl to 9303', CBU, 20 std short trip. 9-5/8" @ 4659' 9303' TD, (0'), Wiper trip f/7" csg Wt. 10.0, PV 17, YP 8, PH 9.0, WL 6.4, Sol 14 Fin 20 std short trip, CBU, POOH, no tight spots. RU Schl, RIH w/DIL/SP/SFL/GR/FDC/CNL; could not get logs past 8971', POOH w/logs. PU centralizers & set of wheels, TIH w/logs; unable to get past 8971', POOH w/logs. TIH w/bit/JB, hit bridge @ 8990' DPM, TIH to btm, circ hole cln, POOH. RU Sch, TIH, rn DIL/SFL/SP/GR f/9277'-5000' & ~DC/CNL/CAL f/9277'-8350' & 5000'-4659', RD Schl. TIH f/wiper trip to rn 7" csg. 7" @ 9279' 9188' PBTD, 9303' TD, Tst'g 7" packoff 10.0 NaC1/NaBr Fin TIH, no tight spots, C&C, POOH, LD DP. Rn & lnd 213 jts, 7", 26#, J-55 BTC csg to 9279' w/FC @ 9188'. M&P 510 sx Ci'"G" W/5% KC1, 1% CFR-2, .3% Halad 24A. Good rtns thru out. Displ w/NaCl/NaBr & bump plug.w/3000 psi.. CIP @.0425. hfs, 5/15/85. Press tst..csg w/3000 psi f/15 mins; 'OK. .Fits'held. PU-BOP Stack, set Slips, blow dry'120'.7" csg. Rough cut csg. ND BOPE, make final cut, insti lower pack-off. NU tbg head w/upper tree assy & tst pack, off to 3000 psi; OK. rOate ITitle 6/12/851 Dr i~i~ Anchorage ARCO Oil and Gas Company Daily Well History-Final Report Inslructio.g: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite'or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data. in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. District IC°unty or Parish I Alaska Field ~Lease or Unit I Kuparuk River Auth, or W.O. no, lTitle I AFE 604569 Doyon 9 North Slope Borough ADL 25635 IAccounting cost center code State Alaska J Well no. 1R-6 Drill AP1 50-029-21331 Operator ARCO Alaska, Inc. Spudded or W.O. begun Spudded Date and del~lh as of 8:00 a.m. 5/16/85 A.R.Co. W.I. 56.24% IOate 5/5/85 Complete record for each day reported 7" @ 9279' 9188' PBTD, 9303' TD, RR 10.0 NaC1/NaBr Tst pack-off to 3000 psi. Iotal number of wells (active or inactive) on this DSt center prior to plugging and I bandonment of this well our lPrior status if a W.O. 1045 hrs. I PR @ 0700 hrs, 5/15/85. Old TD Released rig 0700 hrs. Classifications (oil, gas, etc.) 0±1 · Produi;ing method Flowing Potential test data IDate 5/15/85 PB Depth Kind of rig 9188' PBTD Rotary IType completion (single, dual, etc.) ... . Single- - Official reservoir name(s) Kuparuk Sands Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day .,, Pump size, SPM X length Choke size T'.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct For form prepa;ation an~ ii;tradition7 see Procedures Manual, Section 10, Drilling, Pages 86 and 87. Drilling Superintendent ARCO Alaska, Inc. Pos! Office BO~,,_.~J360 Anch6rage, Alaska 99510-0360 Telephone 907 276 1215 June 13, 1985 Mr. C. V. Chatterton Commi s s i oner State of Alaska Alaska Oil & Gas Conservation Commi ss ion 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' State Reports Dear Mr. Chatterton' Enclosed are the May monthly reports for the following wells' 3B-4 1Q-13 1R-6 2V-16 4-9 (workover) 3B-5 1Q-14 1R-7 L1-1 4-13 (workover) 3B-6 1Q-15 2V-13 L1-10 4-30 3B-7 1Q-16 2V-14 L2-24 4-31 3B-8 1R-5 2V-15 L2-28 9-34 9-35 9-16 (workover) 11-13 If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRUg/L56 Enclosures RECEIVED JUN 1 A!aska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRIchfleldCompany STATE OF ALASKA ALASKA (~ND GAS CONSERVATION CO~...~tSSION MONTHLY REI ORT OF DRILLING AND WORKOVER OI ER TION$ · Drilling well I~X Workover operation [] 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 85-71 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21331 4. Location of Well atsurface 272' FNL, 222' FEL, Sec.19, T12N, R10E, UPI 5. Elevation in feet (indicate KB, DF, etc.) 84' RKB 6. Lease Designation and Serial No. ADL 25635 ALK 2568 9. Unit or Lease Name Kuparuk River Unit 10. Well No. 1R-6 11. Field and Pool Kuparuk River Field Kuparuk River Oil Pool For the Month of Ma:y ,19 85 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well ¢ 1045 hfs, 05/05/85. Drld 12-1/4" to 4678'. Ran, cmtd & tStd 9-5/8" csg. Drld 8-1/2" hole to 9303'TD (5/13/85). Ran logs. Ran, cmtd, & tstd 7" csg. PBTD = 9188'. Secured well & RR @ 0700 hfs, 05/15/85. 13. Casing or liner ru.n and quantities of cement, results of pressure tests 16", 62.5#/ft, H-40, weld conductor set ~ 110'. Cmtd w/215 sx CS II. 9-5/8", 36.0#/ft, J-55, BTC esg w/FS @ 4659'. Cmtd w/1390 sx PF "E" & 425 sx PF "C". 7", 26.0#/ft, J-55, BTC csg w/FS @ 9279'. Cmtd w/510 sx Class "G". 14. Coring resume and brief description None 15. Logs run and depth where run FDC/CNL/Cal f/9277' - 8350' DIL/SFL/SP/GR f/9277' - 8350'WLM Cal/DIL/GR f/8350' - 4659'WLM (Cal FDC/CNL f/5000' - 4659'WLM continued to 9277') 6. DST data, perforating data, shows of H2S, miscellaneous data NONE 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Alaska 0il & Gas C0n~, '"m SIGNED _ _ TITLE Associ ate Engi neet DATE ~f',~'~5~ NOTE--Report o~this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 TF. Mp/MRS, 7 Submit in duplicate ARCO Alaska, Inc. Post Office ~iO0360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 May 31, 1985 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commi ss i on 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 1R-6 Dear Mr. Chatterton: Enclosed is the Well Completion Report for 1R-6. I have not yet received a copy of the well history. When I do, I will forward a copy to you. Also, the bottomhole location, geologic markers, TVDs, and tubing details will be submitted when the gyroscopic survey is run and the well completed. If you have any questions, please call me at 263-4944. Sincerely, d. Gruber Associate Engineer JG/tw GRU9/L27 Enclosure Ok/ ARCO Alaska, Inc. is a Subsidiary of AtlanlicRichfieldCompany STATE OF ALASKA ALASKA ~..;AND GAS CONSERVATION CO.~.~.?llSSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [~X ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 85-71 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21331 4. Location of well at surface 9. Unit or Lease Name 272' FNL, 222' FEL, Sec.19, T12N, R10E, UM Kuparuk River Unit At Top Producing Interval 10. Well Number To be submitted when gyro is run. 1R-6 At Total Depth i 1. Field and Pool To be submitted when gyro is run. Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Kuparuk River 0i 1 Pool 84' RKB ADL 25635 ALK 2568 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 05/05/85 05/13/85 05/15/85I N/A feet MSLI N/A 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+I'VD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 9303'MD 9188'MD YES [] NO D]X N/A feet MDI 1550' (Approx) 22. Type Electric or Other Logs Run FDC/CNL/Ca 1 , D I L/SFL/SP/GR, Ca 1/D I L/GR, FDC/CNL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSlZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# H-40 Surf 110' 24" 215 sx CS !! 9-5/8" 36.0# J-55 Surf /+659' 12-1/4" 1390 sx Permafrost E &1425 sx Permafrost C 7" 26.0# J-55 Surf 9279' 8-1/2" 510 sx Class G 24. Perforations open to Production (M D+TV D of Top and Bottom and 25. TUBING R ECOR D interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None N/A 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OI L-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAs-oIL RATIO TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED.k, OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None RECEIVED ,daS~o & Gas Cons, Commismon Anchorage Form 10-407 GRUg/WC12 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE ... ;?~"~. ~.' ,--~'.: ~ r t.:~t.-' : ·FORMATION:TESTS' NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and,time of each phase. .. · N/A N/A : . · \ . . . · . · 31. LIST OF ATTACHMENTS Nnn~ - ' - : - 32. I hereby certify that the foregoing is true and correct to the best of my knowledge - Signed /~ ~)~(d .~~-~ Title Ass°ciate Engi~ee~ Date 5 ',~-~'~.~ INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as referenCe (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 SUB-SURFACE DIRECTIONAL SURVEY F'~'l UIDANCE [~ONTINUOUS ['~"IOOL Company Well Name Field/Location Arn~[c R~C~P~EL~ co.~,,A~ , 1R-6 (272' FNL. 222' FEI,. ,q19. T12N. R, IOE. KUPARUK, NORTH SLOPE, ALASKA I I i Iii t Job Ref,erence Nq; 70565 Lo~3~3ed By: KOZ US KA RECEIVED J U k ~ 0 ~985 Alaska Oil & Gas Oons. Anchorage Date 23-J'UNE- 1985 Computed By: OUDNEY ommissio~ GCT DfRECTIONAL SURVEY CUSTOMER f, IS?ING FOR ARCO AEASKA, INC, ~.R-6 KUPARUK NO~TH SLOPE,ALASKA SUrVeY DATEr 8 ,JUN 85 ~NGINE~R! D.: KOZUSKA METHODS OF' COMPUTAT3[ON TOOb LOC~T]ON{ TANGENTI~IJ- averaqed deviation and azimuth ~NTERPOL,~TYOW: LINEAR VERTICAL SECTyO~ fIORIZ, DIST, PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 42 DEG 38 MIN WEST ARC~ RBRSKA. TNC. 1R-6 KUP~RIIK NORTH SbOPEaA(,ASKA ?RUE 8UR-S£~ COURSE MER$1IRED V~RTICAb VER?)CAG D£VIA?ION A~I~UTH DEPTH DEPTH DEPTH DEG MIN DPG M~N 0,00 lO0,O0 ~00,00 300,0O 400,AO ~00,00 ~00,00 700,00 gO0,O0 900,00 0,00 100,00 2O0 O0 3O0 O0 399 99 499 99 5q9 99 699 98 7n9 95 899~68 1000,00 998 80 100,00 1097 200,00 i194 I~ 0 ~00.00 1291 ~9 400,00 1386 ~00,00 14m0 1600,00 1573 I~ 700,00 ,664 1800 O0 1754 1900~00 1843 CO~PU?ATION DATE.: 27-JUM-85 DATE' OF SURVEY{ 8 JUN 85 KELGY RUSH{NG EbEVATIONI ENGINEEPl D~ KOZUSKA INT~RPOLA?ED VALUES FOR EVEN tO0 FE~T OF MEASURED DEPTH YERT{CRb DOGLEG RECTANGULAR COORDINATES HORIZ' DEPARTURE SECTION SEVERITY NORTH/SOUTH ERST/WEST DI$T, AZIMUTH FEET DE~/IO0 FE~T FEET FEET DE~ -84,00 .0 0 N .0 0 E 0.00 16,00 0 1) N 22 46 W 0.li 116.00 0 20 2i6.00 0 23 315.09 0 28 ~ ~6 40 ~ -1.36 415.99 0 31 ~ 34 42 ~ -2.22 ~15,q9 0 26 ~ 38 10 ~ -3.06 615,98 0 17 S 89 59 W -3,42 715,~5 2 27 ~ 27 54 W -1,49 815,68 5 50 S 30 6 W 5.50 914.M0 8 57 101),18 11 35 1110,69 13 56 I ~07.?0 16 20 ]07,~9 lB 32  396,7! 20 59 489,28 23 10 70,97 ~6 51 18 ~759,~8 29 17 2000 O0 1929 3~ la45.35 ]1 47 2100 O0 ~012 84 1928.84 34 5~ 200 O0 ~093 24 3 0 ))00 00 ~169 75 ~,24,75 B 1 67 O0 2242 O0 2311 O0 2377 O0 24]9 O0 ~499 O0 2554 S 32 31 W 18,39 S 34 16 W 35.98 ~ 39 lq W 57,99 S )7 23 W 84,1'0 A 34 54 W 11],85 S 35 8 W 147,29 S 36 20 W 184,84 ~ ~6 30 W ~24,75 S 34 45 W 267,80 S 33 15 W 314,34 S 31 58 W S 3i 35 W S 31 31 W 41 40 S 3213 W 2158,67 44 3? $ 32 23 W 94 2227,04 47 45 ~ 33 I W 2,4 2293,24 50 23 $ ]3 15 W 8~ 235~,80 ~2 0 S ~3 29 W lq 2415,19 55 ? $ ]4 57 W 39 2470,]9 57 48 S 36 7 W 2400 2800 2600 2700 2800 2900 364.28 41~,~0 47 .60 539.83 607 14 67~ 14 75~ 86 829 75 OOq 37 992 ii $ ]6 44 W 1077.24 $ ]6 5~ ~ 116],48 S 36 30 W 1249.~) S 36 56W 1331.,0 $ 37 37'W 1413,29 ~ 39 32 ~ S 40 18 N 1568,~7 ~ 42 9 ~ 1643.42 S 42 21 W 1717.64 $ 42 31 ~ 1790.90 3000.00 2606 04 2522.04 ~9 39 3100,00 ~655 90 2571,90 60 1~ 00.00 2706 39 2622.39 57 40 3300.00 2762 2~ 2678.~5 ,5 L8 340n,00 281969 273~.69 53 5g 3500 00 28~1 ~2 2797,~2 50 27 3700 O0 3800~00 3078 62 2994,62 47 2~ 3000~00 3146 68 3062,68 46 43 0 O0 0 19 0 12 0 14 0 13 0 12 0 O8 1,28 3.23 3,15 2 61 ~ 70 2 O3 0 ~ 2 56 2 89 ] 03 2 81 2 62 I O1 0 52 0 0 98 0,00 N 0.00 E 0,10 N 0,27 W 0,6' N 0.4~ W. 1,23 N 0,37 W 1,95 V 0,11 W 2,70 ~ O,34 E 3.37 N 0.8~ E 3085 N 0,87 ~ 2,15 N 0,13 W 4,1i S 3.66 W PAGE 1 15 25 S 30 24 $ 47 84 S 68 15 $ 92 54 S 183 O~ S 218 2! 8 257 29 S 84,00 Fl 18 56 S 34 46 W 40 $ 33 50 W 49 S 35 7 W 61 S 36 20 W 58 S 36 8 W 32 S 35 51 W 14 S 35 51 W 26 S 36 0 W 62 S 35 58 W 68 S 35 39 W 300 04 S 211 93 W 367 34 S 35 14 W 346 509 57O 63 '3 699 '765 '833 83 S 240 53 S 271 14 8 305 97 S 342 6R S 3~1 97 S 4~2 15 S 465 77 S 510 53 S 559 85 W 422 87 w 481 89 W 545 46 w 614 34 W 686 91 W 762 63 W 840 83 w 920 37 W 1003 26 S 34 46 W 60 S 34 22 W 90 S 34 4 W 29 S 33 52 W 37 $ 33 45 W 08 S 33 ' O1 $ 33 51 $ 33 W 83 S 33 51 W 902 36 $ 610 30 W 1089 37 S 34 4 W 97 104~ 117t 1234 1292 1349 1404 1458 662 98 862 ~9 $ 91 ! 24 $ 960 14 $ 1010 22 $ 1060 20 W I175 8R W 1262 37 W 1345 90 W 1426 O7 W 1505 03 W 1581 82 W 1656 76 W 1730 19 W 1802 96 S 34 16 W 19 S 34 26 W 06 S 34 34 W 83 S 34 43 W 54 S 34 55 W 54 S 35 tO W 39 $ 35 27 W 10 $ 35 44 W 89 S 36 1W 10,59 W ,27 W 36 80 14 W 84 67 5~ w 114 86 88 w 148 109 04 W 186 133 03 W 226 158 37 w 269 184 6~ W 316 O000 t 95 N 3 5 W 73 N ? 13 E 48 N E 2 16 N S 33 tV 5 50 S 41 41 W ARCh AL, ASKA, ]'NC. 1R-6 N.ORTH SLOPE ~ ALASKA COMPUTATION DATE: 22-JUN-85 PAGE 2 DATE OF SURVE¥~ 8 JUN 85 KELbY BUSHING EbEYATIONI 84,00 FI ENGTNEERI D, KOZUSKA INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASUREO DEPTH TRUE SUR-SK~ COURSF MEASURED V~RTICAL VERTICAb DEVTA?ION AZIMUTH DEPT. D~PTH ~EPTH DEG MIN D~G MTN VERTTCAL hO~EEG RECTANGUbRR COORD~NAT£$ HORZZ, DEPARTURE SECTION SEVERZTY NORTH/SOUTH ER~T/WEST DXST, AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG ~IN ,oo 4500. 3575. . 349~.~9 43 5 4600 O0 3648.90 3564.90 42 15 4700:00 37~3"I~ 3639.12 42 23 420~ O0 3795.99 37~1.~2 44 ~2 4900:00 3866.70 3782.70 45 27 ~ 4255 W 1263.07 $ 43 2 W 1934,30 S 4318 W 2004.55 S 4329 W 2073.77 S 42 57 W 2141.93 $ 43 14 W 2210.47 ~ 43 37 W 2278.~6 $ 44 5 W 2345.25 S 44 27 W 241~.78 S 44 42 W 2484.36 0.59 0.64 0 81 1614 1,36 1664 0,76 1714 1.02 1764 0,92 ~813 1,44 1862 1,96 1911 1.09 196 1.511 21 S 1109 18 W 18;/4 58 $ 36 16 W 1563 32 S 1157 75 W 1945 35 $ 36 31 W 5~ S 1205 85 S 1253 61 $ ~299 71S 1346 90 S 1393 24 $ 1439 33 $ 1487 59 S 1537. 78 w 2015 39 w 2083 97 W 2151 75 w 2219 40,W 2287 81 W 2353 66 w 2422 28W 2492 5000.00 3936 11 3852.11 46 47 5100 O0 4003 70 3919.~0 47 52 ' 4070 50 398~.80 48 17 5200.00 5300.00 4136 88 4052,88 48 28 5400.00 4203 0~ 4119,03 48 4~ 5500.00 4268 84 4t. 84,~4 48 59 5600.00 4334 39 425~.~9 49 9 5700 00 4399 5~ 4315,58 49' 20 5800:00 44~4 66 4380.66 49 16 5900~00 45]0 65 4446.65 48 24 6000 O0 4596 99... 4512 92 48 34 6100~00 4663 10 4579 10 48 27 6200.00 4729 6~ 4645 6300.00 4796 34 4719.. 4862 6o 4778 6400,00 6500.00 4928 6600,00 4994 6700°00 5061 6800,00 5127 6000,00 5194 75 4~44 71 4010 27 4977 79 5043 O~ 5110 68 48 7 34 48 1~ 69 48 32 75 48 44 $ 45 1 w 3380 S 4455 w 3455 S 4444 W 3530 S 4433 W 3604 S 44 23 w 3679 71 48 28 . 8 44 ? W 3754 27 48 15 S 43 48 W 3829 79 48 22 ~ 43 42 W 3904 08 48 36 $ 43 3! W 3979 7000,00 5260 25 5176,25 48 4 7100.00 ~328 08 5244,08 46 52 7200,00 53963~ 531..322 47 1 7300.00 5464 74 5,80.74 46 39 740075 ,00 55~3 50 5449.50 46 25 ~,00 5602 ~' 5'I~.61 4612 76 ,00 5671 4 5~8 ,~4 46 11 7700.00 5741 20 565? 20 45 55 7800,00 5810 90 5726~90 45 46 7900,00 5880 90 5796,90 45 19 S 44 59 W 2556.31 S 45 14 W 2629.03 S 45 22 W 2704.26 $ 45 12 W 2778.97 $ 45 10 W 2,53.89 S 45 3 W 2929,1.1 ~ 44 51 w 3004,56 $ 44 39 W 3080.35 S 44 50 w 3561 S 45 19 W 3231.28 $ 45 9 W 330609 99 54 O3 79. 83 96 57 22 O9 S 43 18 W 4054 05 S 42 41 w 4127 S 42 27 W 4200 S 42 27 W 4)73 S 4234 w 4346 S 42 40 W 4418 S 42 47 W 4490 S ~2 47 W 4562 $ 42 56 W 4634 S 43 11W 4705 52 62 16 44 59 63 34 75 167 056 044 038 030 030 056 028 096 046 21 38 0 3?. 039 0 0 o [ 29 O, 8 o I 90 0 38 0 43 0 35 0 58 0 22 o 0 0 37 0 05 2012 66 $ 1588 02 W 2563 71 S 38 16 W 2064 2116 2169 2222 2275 2328 2382 2436 2489 6] $ 1640 92 $ 1693 52 $ 1746 40 $ ~799 51 S 1852 9] $ 19'06 80 $ 1959 78 S 2013 73 $ ~066 2542 2595 2648 2701 2754 2807 2969 3023 86 12 43 $'24 34 $ 2538 55 $ 2590 3077 96 S 264 313 $ 269~ 3239 39 S 2790 3292 89 S 2840 3346 08' S 28~8 3399 07 S 2937 345 93 $ 298 3556 66 $ 3084 27 W 2636 21, W 2710 39 W 2785 56 w 2859 93 w 2934 30 W 3009 68 W 3085 07 W 3160 39 W 3235 7 W 89 S 38329 78 $ 38 08 S 38 49 W 63 S 3859 W 50 S 39 9 W 64 S 39 18 W 14 S 39 26 W 75 S 3933 W 53 S 3941 w 63 W 50 W 3607 08 W 3682 56 w 3757 32 W 3832 98 W 3906 63 W 3981 55 w 331o o. s 39 48 w 74 S 39 55 W O? 8 40 2 36 S 40 8 94 S 40 t4 W 82 S 40 19 W 80 S 40 2f'' 29 S 40 84 S 40 31 W 61 $ 40 35 w 21 W 4056 49 S 40 38 W 29 W 4129 94 w 97 W 4420 94 W 4492 87 W 4564 63 W 4636 42 w 4707 90 $ 40 41W 96 S 40 43 W S 4 46 W 68 S 40 48 W 79 8 40 50 W 78 S 40 52 W 45 S 40 53 81 S 40 55 W 1~.-6 KUPI~RtlK NORTH SLOPE,ALASKA CONPuTAT[ON DATE: 22'JUN-85 TRUE SUB-SER COURSE MEASURED VER?ICAt VERTTCAb DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG M~N DEG MIN PAGE OA?E OF SURVEY: 8 dUN 85 ~ELGY RUSHING EbEVAT[OM= ENG[NEERI D, KOZUSK~ INT£RPOtATED YALU~$ FOR EVE. ~00 FEET OF ~E~SUR~D DEPTH VERT~CRb ~OGbEG R~CTANGUbRR COORDINATES HOR~Z, DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/NEST Df$T, AZIMUTH FEET DEG/tO0 FE~T FEET FEET DEG MXN 8000.00 5951. 8100.00 6021 8~00 O0 60q3 830o~00 ~165 8400 O0 62]8 8500 O0 6313 8600 O0 63g0 8700 O0 6469 8~00 O0 6549 8900 O0 6632 24 5R67,24 45 13 85 5937,85 44 42 44 6009.44 44 ~ 40 6081,40 44 0 14 6~54.~4 42 1~ 50 6229e50 40 5 87 6306,87 38 32 76 6385,76 37 25 85 6465,~5 35 40 41 6548,41 32 44 9000,00 6718 54 6634 54 28 10 9100 O0 6808 5R 6724 58 23 20 9900~00 6900 91 6816 91 22 28 9300.00 6993 32 6~09 ]2 ~2 28 9303,00 6996 09 6912 09 22 28 S 43 3 W 4776.~3 0,26 S 43 0 W 4~47.R3 1,20 S 43 3 w 40~.45 ~.42 S 43 3~ W 49 ,89 .46 $ 46 36 W 5055,44 2,81 S 50 0 W 5120,82 2,36 S 51 49 W 5383,47 1,48 ~ 51 41 W 5244.~! 0,70 $ 51 5] W 530],23 S 52 9 W 5358.88 3 52'41 W 540~,89 55 24 w 5451.52 56 14 W 5488,87 56 14 W 5526,02 ~6 14 W 5527,13 4 5O 4 41 0 O0 0 O0 0 O0 3608 52 S 3133 04 W 4778 3660 28 S 3181 36 W 4849 3711 3761 3854 3893 3931 3969 4003 33 S 3228 99 S 3276 55 S 3324 23 $ 3374 94 S 3423 92 S 3471 O1 $ 3518 ?~ S 3563 99 W 4919 48 W 4988 95 W 5057 03 W 5122 39 W 5 ~ 67 W 53~9 12 W 53 4034 70 S 3603 4060 46 S 3638 40,81 88 S 3670 S 3701 41 S 7 2 84,00'F~ 32 W 5409e51 S 4i 46 W 28 W 5452,01 S 41 _51 W ~I W 5489,2,~ $ 4157 W W 5526,29 ,9 42 3 W 90 w 5527,40 S 42 ~ W 84 ,9 40 57 W 6i ,9 40 59 W 38 ,9 41 1 W 78 ,9 41 3 W 23 S 41 6 W 42 S 41 1! W 23 16 ,9 41 33 W 64 ,9 41 40 W ARCfl AEASKA, TNC. 1R'6 KUP~RUK NORTH SLOPB.ALASK~ TRUE ~UR=SEA COU~S~ MEASURED V~R?ICA[., VERTTCAL DEVTATION AZIMUTH DEPTH DFPTH ~EPTH DEG MTN DEG MEN COMPUTATION DATEI 22-JUN-85 DATE OF SURVEY 8 JUN 85 KEbbY ~USHING ~bEVATIONI ENG~NEERI D; KOZUSKA IHTERPOLATED VALUES FOR EVEN lO00 F~ET OF MEASURED DEPT VERTTCAb DOGLEG RECTANGUlaR COORDINATES HOR~, DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DXST, A.Z~MUTH FEET PEG/t00 FEET FEET FE~T PEG ~IN 0,00 1000.00 998 2000.00 t929 3000.00 2606 4000.00 3215 5000.00 3936 6~00 O0 4596 7ooo: § 8000, 5951 9000.00 6758 0 O0 -84.00 0 0 80 914.80 8 57 35 1~45 35 31 47 04 2522 04 59 39 9~ 31.3t 90 45 4~ 11 385~ 11 46 49 9~ 4512 92 48 34 86? 54 6634,54 28 10 6996.09 6912.09 22 28 N 0 0 E $ 32 3t W la,39 S 31 58 W 364.28 S 36 44 W 1077 S 42 55 W 1863,07 S 44 59 W 2556.31 S 45 q W 3306.09 S 43 1~ W 4054,05 S 43 3 W 477~,83 S 52 4t W 5408,89 ~ 56 14 W 5527,t3 O0 61 89 O! 52 6'/ 21 90 26 50 0,00 0 1.5 300 902 2542 3077 ~0 O0 N 0 25 S ~0 04 S 21 36 S 6t~ S 1588 49 S 2119 96 S ~642 O0 E 0 59 W t8 ~0 ~ ~0 18 W 1874 02 w 2563 55 w 3310 2t W 40~6 04 ~ 4??8 32 W 5409 PAGE 4 84, O0 F~ 4103,75 $ 3702'90 W 5527i40 S 42 3 W A~CO ~Lh$KA~ TNC. KUPtRUK o.oo o oo -,4 oo o o ,4.00 oo o oo o o :oo oo oo o a .oo oo oo o sa:o oo oo o 48a.01 oo 400 oo 0 584.01 5~4 O0 RO0 O0 0 26 684.02 6~4 O0 600 O0 0 15 784 04 764 O0 700 O0 1 58 684:~4 8~4 O0 RO0 O0 5 lq 98B,02 9~4 O0 900.00 8 33 0 1000 O0 l! 15 108~.~5 10~ ~0 100 O0 1~ 40 118R,98 51 1 150.2 54e oo 1400 o0 ~! 4 4 611.68 1584 O0 1500 O0 23 15 1721.02 1684 O0 1600 O0 25 3 183~.68 1784 O0 1700 O0 27 37 2188 33 2084 O0 2000.00 37 46 )45~ 96 ~ 2~00,00 46 25 2610 60 ~3~4 O0 2~00,00 50 ~5 2773 61 ~4~4 O0 2400,00 54 2~ 2956 68 ~584 O0 2500'00 59 3 3658.31 2984 O0 2000.00 4845 3o 4 oo3ooo.oo47 3054.19 3184 O0 3i00 O0 46 ? ao9 .o9 oo 3 oo:oo 45 5 4237.21 338 O0 3300,00 43 53 4374.60 3484 O0 3400,00 42 55 3500.00 4511.76 3584 O0 42 59 4647.27 3684 O0 3600.00 42 0 478].4.6 3784 O0 3700.00 43 55 4924.69 38R4 O0 3800,00 45 44 CO~iPU?A?ION DATE; 22-JUN-B5 PAGE DATE O~ SURVE¥~ 8 JUN 85 KELLY BUSHING ELEVATION{ ENGINEER; D, KOZUSKI [NTERPO[.A?ED VALUES FOR EVEN 100 FE£~ OF SUB-SE~ DEPTH VERTICAL DO~LEG RECTANGULAR COORDINATES HOR][,~ DEPARTURE SECTION SEVERITY NORTH/SOUTH E~S?/WEST DI~T. AZIMUTH FEET DEG/500 FEET FE~T FE~T DEG MXN N 0 0 K 0.00 ~! 31 41 W 0,i3 ~ 9 6 W -0,09 N 12 22 E -0,56 ~ 24 24 E -1,24 ~ 33 11 E -2,~8 ~ 38 52 ~ -2,93 M 58 40 W -3,45 S 27 25 W '2.08 $ 29 56 W 4,00 16 07 33 37 55 33 8~ 01 i1~ 97 1.48 189 44 233 42 282 65 337 46 $ 32 28 W S 33 44 W $ 39 8 W S 37 44 W $ 34 54 W $ 35 ~0 W 836 3 W S 36 14 W $ 34 10 W S 32 36'W 31 4O W 398.93 31 29 W 469.60 32 16 W 552.51 32 40 W 648.52 33 14 W 760.91 34 31 W 887,99 36 33 W 1040,14 ~6 40 W 1212,41 ]7 10 W 1362,98 ]9 36 W 1495,42 S 41 35 W 1612 S 42 21 W 172) S 42 41 W 1830 S 43 26 W S 42 59 W 2i24 S 4~ 18 W 2218 S 43 48 ~ 2]09 S 44 23 w 2402 S 44 44 ~ 2501 t8 47 18 41 61 48 02 32 97 0.00 0,39 0,17 0 14 0 16 0 O9 0 06 0 90 3 04 3 46 2 6i ~ O~ 3,22 74 27 3,46 20 i,O0 2,38 1 96 0 90 I 25 0 69 0 80 0 63 0 89 0 53 I 62 I 23 0 O0 N 0 05 N 0 52 N I 1l N I 83 N 2 58 N 3 28 ~ 3 8] N 2 6~ N 2785 45 66 91 545 6~0 ! t836 1903 1974 0 O0 E 0 25W 0 42 W 0 40 w 0 16 W 0 26 g 0 77 E 0 93 E 27 S' 03 S 79 8 5O S 81S 6 24 8 81 5* 8 111 02 S 138 60 S 166 98 S 197 9 32 w 48 8~ W' 82 09 W {13 60 W' 41 80 W' 3 W 234 ~2 W 204 37 W 340 04 S 2 0 43 $ 2~8 04 S 312 3 S 365 ~9 S 427 04 S 498 4~ S: 588 10 S 6~1 45 $ 7~2 95 $ 864 03 S 939 1285 80 $ i 156 39 S i22 93 S 12883 80 S ~ ~ 1381 9 11 $ 1549 50 W 40: 14 W 47, O4 W 656 39 W 770 50 W 898 03 W 1.052 77 W 1225 24 W 1376 28 W 1508 70 w 17 80 W 584 33 w 194~} 5B W ~040 215 W 231~ 65 W 241 6~ W 2509 84,00 r~ 0 O0 N 0 0 B 0 25 N 79 40 W 0 67 N 39 17 W I20 N 19 18 W ~ 84 N 8 4~ W 60 N 5 E 3 37 N 270 N 40l $ 46 8 56 21 S 35 5 W 6' 8 W 58 8 38 50 W 76 $ 35 52 W 97 $36 )2~ W 62 S 35 W tt $ 35 W 56 $ 34 85 W 47 $ 34 24 W 78 $ 342 W 31 S 33 47 W 24 $ 33 42 93 4 98 S 3 W 6 ~0 S I~ 46 W 92 $ 9 W ? $ 36 30 W 3 S36 '50 W ~6 $ W 80 $ 37 36 W 66 $37 51W 70 S 38 7 W ARCO AEASKA, TNC. 18'6 KUPARUK NORTH SLOPE,At. ASKR COMPUTATION DATE,: 22-JUN-85 DATE' OF SURVEY{ 8 JUN 85 KELLY BUSHING ELEVATION1 ENGTNEERI D, 'KOZUSKA PAGE 6 84,00 F~ O0 3900.00 47 42 O0 4000,O0 O0 4{00 O0 48 37 O0 4200 O0 49 O0 4300 O0 49 20 O0 4400 O0 48 55 O0 4500 O0 48 33 O0 4600 O0 48 20 O0 4700 O0 48 15 O0 4800 O0 48 36 6583 ~5 4984 O0 4O00,00 48 37 6?34 12 5094 O0 5000,00 48 17 6884 77 5194 7035 33 5284 7181 90 5384 73~8 05 5484 74 ] 10 5584 7617 56 5694 7761 43 5794 7904.41 5884 O0 5100.00 48 33 O0 5200.00 47 26 O0 5300.00 47 2 O0 5400.00 46 35 O0 5~00.00 46 15 O0 5600 O0 46 10 O0 5700~00 45 47 O0 5900,00 45 lg 8046,50 5984 O0 5900.00 45 7 8186.86 6094 O0 6000,00 44 6 0~25 90 6184 oo 6{00 OD a~ 5o 846~:77 62~4 O0 6200:00 AO 49 8591 ~2 63~4 00 6300.00 38 40 8717 93 6484 O0 6400.00 37 18 8841 75 6584 O0 6500.00 34 34 8960 46 66~4 00 6600.00 ~9 58 9073 ~6 67~4 00 6700.00 ~4 36 9181.70 6884.00 6800.00 ~2 28 9280,91 6984,00 6900.00 22 28 9303.00 6996,09 6912.09 22 28 DRG ~IN FEET S 45 11W 2608.19 S 45 20 w 2719,39 S 45 q ~ 2832,26 S 45 1W 2946.55 S 44 40 W 3062 2~ S 45 5 W 3178 59 S 45 10 W 3291 46 ~ 45 0 W 3404 51 S 44 48 W 3516 20 ~ 44 28 w 3628.98 s 44 ~{ w 3742.88 s 43 4~ w 3855,01 $ 43 33 W 3967.67 $ 43 3 W 4080.21 S 42 29 W 4~87.36 ~ a2 30 W 4293.94 S 42 3~ W 4899.02 S 42 47 W 450~.~6 S 42 50 w 4606.69 S 43 11 W 4709.88 $ &3 ~ w 4908.~! S 48 42 W 5095. 89 R 51 46 W 5178,06 S 51 40 W 5254.87 S 51 59 W 5326,92 $' 52 26 W 5389.94 S ~4 16 W 5441.02 ~ 56 ~4 W 5482.08 S 56 14 W 5522.27 S 56 14 W 5527.13 0 86 0 46 0 36 0 18 0 30 1 75 0 28 0 35 0 22 '0 25 1 O8 0 33 0 28 1 95 0 39 0 36 0 24 2o7 s ,7 4 2207 84 $ 1865 28 W 2951 ,369 91S 194694 26! 21 29 W 3408019 S ~ 26 2 S 0 47 W 3632 8 40 t5 W 277 52 S . , 9853 O0 S 24~7 14 W ~745 74 S ~0 R3'W 2933 79 8 ~504 94 W 3857 70 S 40 ~9 W o,5 s s.2 7s w s 40 w 3175 77 S ~732 78 W 4189 71 S 40 42 W 0.26 3408 0.14 '3484 0,07 3558 0 48 0 25 0 ?4 4 65 6 0 o 0.00 0.00 37 $' 2946 5830 55 W 45O5 82 W 4608 57 W 4710 45 $ 40 50 W 82 S 40 53 W 94 S 40 56 W 3632 65 S 3155 55 W 4811 83 $ 40 58 W 3704 64 S 3222 75 W 4910 24 S 41 1 ~ 3775 3837 3890 3938 3983 4022 4054 4077 4100,97 S 4103,75 8 O2 S 3 88 90 $ 3354 56 8 341.9 67 $ 3480 80 S 3537 99 S 3.588 28 S 3629 99 8 ~664 93 W 5006 97 W 5097 08 W ~179 22 w 5255 59 W 5327 06 W 5390 48 W 544~ 36 W 548 78 $ 41 3 W 57 S 41. 9 W 44 $ 41 18 W 96 S 4t 27 W 78 8 41 6O 8 41 4~ 54 S 4~ 50 N 47 $ 41 56 W 3698,74 W 55~,55 $ 42 2 W 3702,90 W 552 040 S 42 ~ W 5070.65 3~8~ 5?20.29 4 8 5371.17 4184 5523.~! 4284 5676.10 4384 5829 58 4484 5980:47 45~4 613~.~8 4684 6281.46 4794 6432.24 4894 INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUE-SEE COURSE VERTTCAL DOGLEG RECTANGULAR COORDINATES HORIZ, DEPARTURE MEASURED VERTICAl. VERT~CAb DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMUTH DEPTH DEPTH DEPTH DEG M~N DEG/IO0 FEET FEET FE~T DEG MXN KUPARUK NORTH SLOPB,ALASKA MARKKR TOP UPPER SAND BASE tIPPER SAND TOP EnW~R SAND BAS~ LOWER ~AND PRTD COMPUTATION DATKI 22-JUN-B5 INTERPOLATED VALUES FOR CHOSEN MEASURED DEPTH BELOW KB 8740 O0 8958 O0 9088 O0 qlfl800 9303 O0 FROM KB 6376.01 6~01.59 6681.fl8 6797.59 6889.82 6996.09 DATE OF SUWVEYt 8' jUN 85 KE~bY BUSH{NG EbEVATION{ 84,00 F~ EMG~NEERI O. KOZUSKA 272' rNb,222' 8UR-SEA 6292 O1 6417 59 6597 88 6713 59 68n5 82 6912 09 SURFACE ~OCA?ZON ~T EL,SEC ig~T{2N.R OE.U M R CTANGUbAR COORDT. ATES ~ORTH/$OUTH EAST/WEST 3886,63 S 3414 06 W 3946,95 $ 3490 68 W 402~.23 ~ 3587 07 W 4057.70 $. 3634]4 ~ 4i~3,3 6 · 75 $ 3702 ARCO AbASKA, INC. KtlPARUK NORTH SLOPEAALASKA ~ARK~R TDP UPPER SAND BRSE UPPER SAND TOP LOWER SAND BRS~ bOWER SAND P~TD TD ************ STRATIGRAPHIC MEASURED DEPTH BELOW KB R581 OD 8740.00 8958.00 9088.00 q188,00 9303.00 DATE OF SURVEY{ 8 JUN 85 ENGI'NF. ERI D, KOZUSK~ SUMMARY FROM KB 6376.01 6501.59 6681.88 6797.59 6889.82 6996.09 ORTGZN= 27~' FNb,2~2' TVD SUB-SEA 6292 O~ 6417 59 6597 88 6713 59 6805 82 6912 09 84.00'F~ SURFACE [,OCATION FEL SEC 19,T12N.~lOE.UM R~CT[NGULRR COOED NATES NORTH/SOUTH ER&T/WEST 3886 63 S 3414 06 ~ 3946 95 $ ~3490 68 W 402~ 93 $3~87 07 w 4057 70 $ :3634 34 w 4079 33 S 3666 ~6{' 410~ 75 $ 3702 90,~ T~UE SUR-SE~ MEASURED VERTICAL VE~T)CAb OEPT~ DFPTH DEPTH 9303,00 6096,09 6912.09 HORIZONTAL DEPARTURE DISTRNCE AZIMUTH FEET DEG MIN 5527.40 S 42 3 W SCHLUMBEROER O I RECT ~ ONAL SURVEY COMPANY ARCO ALASKA INC WELL IR-6 F I ELO KUPARUK COUNTRY USA RUN ONE DATE LOOOEO 8 JUN 8S REFERENCE 000070S6S WELL SURFACE LOCATION: ~-~' FNL, 222' FEL, S19, T12N, R1 UM VERTICAL PROJECTION 42. -]000 0 0 1000 2000 3000 4000 ~000 6000 .... ~-+++.~...~-~-++-. ~..~-4.-~...,-~-~..i ..... ~.++.,;-+~.~.-~-~..~. -~-~--~.a~-~4-~.~4.4-.~-~.~.~-...$4~ .... ~~-~i-.4~2..L~_~.i-.-~i ~ ~ ~ ; .i~.&~...~.Ag~-%-~i%-i ; L~ ~ ~ ~JJ.~._~ ~ ~ ~ ~ ~ ~ ~ ~1~ ~ F~ ~T-~'T'T~ .... ~..~..++. ~..+.++. .+..+-+4-.4-~...~;.+...--4..+4-4-~-+~--~. ~-~.-~+-~-4.-~4.~-~ ~ ~ ~~~ ~ ~ ~ ~ ~ ~~' .... ~--h h?.?-..~---?-? i-*4s~-?.h?.~--. "'?'?'-?"h]'-?"kh?' ";~"-~ r'i'-?h-N-h~" '"h?'~ + ~ hf-~ '~+'H+~+~-'-~'?H :'r"r":":"I'r":'r"r']"':~ ~ -: ~':' ?' ~ :"r: KM'U-r' "':'rr'r~r'~-Fr--':-~ '"F'rT'T-'I'";~"?"'-T'T'T"rT":"rT"r" '!"'rrr-,-r'T-NN'F'T-r'~II-F' "T'~'T-FT"r%I'-F~--l"T%~ i i "T-FT"~ ..... T-~r'"'T"FT-r"[i"%T"r- %-%F'f'T'FFF '-M"%TTT-%"-'~"~%-T"Nr%T- %'~' %h~F' -'~-?--~..--?.. ~ r..,,--?-?-?.-?- -r"~m-~-~-~-'~-T--~-~-~~-~ ~ i i ~~ ~--~-~ i ~ ~ ...... i ~ i i i -.+++.+.+-+...~4.---+..%.-+-~-.-~--+-+.+.+--.++-++~-+~-~-++++.~---~ ..... ~+~-+ ,4~+.~ ~ ~ ~ ~,~ ] : ~ ~ : -'"'~";"'~"': ii! L"4-'~: ........ ~'~[' ' ~-..~.,~..: .-;...~.~-;..~4-~-;-j f i i'~ ~] ~ ..~.~;-~..4..4-~-.~-;-~ { ~ ~ I ~ ~ ~ ~ ~-~-'~'~'~'"~-~-j ~ ~ : ,.4.-- ~-~-~-4-~-- i i i : ~ ~ j ~ : -4.4- ~ i : j i j i !'~'~'-~ '~-; ~'~; ' · "f"~'"~'"~ ...... i'"f'"~"~'"~ "'~-~"'?"~'"~-T"T'+"~"' i"T"~"j-4'"j"{-~'~' -~+-~"~%'{'"?"~'"~ ..... :'-~'?~- ' T~--: -N e'~ ~ -P '-G N~ : : -~- ~ee ~-~ ~..`~..:..~:...~...N..:'s.:~.~...:..~..~.~.~...:.~.:...:...:..:~.~..:...~..~:...~...~...:...~.~ ....... ,-:.: .... ~-+.+.:-..~ ..... ~*.+.¥$-~.,.~-~--N~...~-1..~-;-~-~--~.~... ~..:-,~.~.-~ ..... ~-~..~-~-.~...:.-~..~-. ...h?..f.N..f..~.f~.....?+~N.~.f.~..N...f.1-f.f.N.~hf.??.h.~.hNj.~.??+.~.eN.N..N+:..~+++~%+.N..?.+.N~+~eH.. "+"~'"~'"~'"I--'~"+-'~--~ ..... ~-"~"'~'-+"~"+"~-&"~'" '-'~'":"+"~'"~'"~"'~-~"-~'" '-~"~-'~"'~'~"+"~"'e"~"-;'"%"~'"~'~"'~'--~-~---:---:---..4-:...~..~-j..-~---~..~-¢...-~-.:-.4-:---~--:-~-~-¢- ..4-4...~--~-~-~.-:...~ - : : ; i , - , : : : · . i : : · - : i : , : : ~ ' : : i : : ' ' ~ ' : ' : i : : : : : : : : : : : : : : : : i : : ; : : : : : ~ : : : "j"T"r"{"T"?"{'"?"{ ..... {'"~ ...... rT"r"F'~'"}"' i'"F F'l-"c"r'e~'T-j' :~--r'-F -r'r?f--~---?r--r-rT-{-f-e'-?]-?W-'f'-f'--,~-e-?-e'--'-~---?-~{-t"{~-~-{--' ~'~'~":~-~-{-~ ...,...,...~...~ ~ ~ ~ ~ ~ ~ ~ ~...~.-.4...~ ..... ~ ~ ~ ~. - - 4...,-.,...~ ...... ,...~.~...~...~...%..-~...e..,-..{ ~ ~ ~ ~ ~ ~ ~ ~ ] ~ ~ ~ ~ ~ ~ ~ ...,-4...%- e..~..e..~-4.~-- .--4 -.~----~---%---, -~--.%...e- e- ~~]~[ I~: ~ ~-~'*'"4"4-~-~"~"'%"~ .-.~-.-~..-%...$-4 ..4-.-~.-$-~ ....... %..~-~.~-~.-%-..g~ ~ ~ ] ~ ~ ~ ~ ~"~ ..2...2...~...i...L.l...~...i....~ ..... i..i...i..A.L.i..~_i..i.....-A.L4-..~-.I-L.i..L..~- -A..i-L.~-Li~-L..L- -.L-A-i...L~..~-Li-'.-.L.L.!.g-i-$.~._.L.L..J ..~..3...~-~-L.L-~-L. .... L.;-..L.L.L.;..~...:...~ ...... ;...L.;.-L.L.L.L.~...;.......~...L.L.L.~...:..;-;...;... -;-.i..~...~-]-$.-;..-;...a- .--~;...;-LA--L.L-~-~ ..... L. Li.i~.a.L.L.L.[-$...;...L.L.LL.L~-L.-..L-~.-L4-~4..S...;-LA- :: ;, .. :. ~.:,:.. : ~ :::~ :::~ ........ ~::i,.~.~ ........ [ ............... +-.+.-??f.-e-?..~---~-.....e+-.?.?-+..+.-?--e.~ ....... +--+-'e'+-i-+-+-?f- -+~.+-e-f{-?{..~ ...... +-+-+--{-$--e--e+~- f'"N~'"N'"ffi'"'?"{ ....... {'"9'"9'"{'"~"'{'"{"'h ....... ?"?"?"f'!'i'"hM"' "'?"?'{"'N"!-?'f"~ ...... fi-?'f'T"f-hM ...... ?-?"{ -'-r"?-?-~"-}-"?-c--'}'"~ ....... ~.-.r'-?-'?'t'--t-'?--t'--~ ....... ?.--r-?---?..}---?-r--?-?- -'?-}---?--}-+--~--~---~---~--- ---?--~---?-?- ---?-?-?-~- --~-?--?-?-~---~----r-.?--~ ...... ?.?--?--?-?-~---:-- ~--:--- ---.-?--~--,-- ?.-~.-~- -~-?--. ...:...:..i...:...i.. i...:..3...: ....... :....:....:...i...i....:....L..:.2 ....... L.i...~.. :...Li..-LL-i- -..Li...i...i._l...Li...i...~ ...... LL--LLI.i..:..%.i-..i...L!.i...L.:....:...:._..:i~....:...: ...:...Li..L_:_.. :...L.:...:...i-i .:..i.i.!...L. ...:...:...~...z...~...~...~ ....... ; ......... :..;...:...~..~...:...~_.~ ....... z....:_..;...~...~..~..~_:_~_ ._~, , , +._~.~ _~..~...~..~..~..~..~_.~..~ ...... ~...~-s-~..~"~..~...~-~.i.z...~...~...;...~...~..i...;-~..~.~...~...~...~...~..~-~...~..~..~ : : : J ~ .... , · i , i i : : , ...... , : : , : ,-, , ! . : , - ' .... i ~ i - ; i i i - - J : : · , - - : : : , : : - · :::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::: :::::::i::i::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::: · ..~...:...~...:...N.+.N ...... :...:....;...:...N...-~...N ....... :...:..~...~-~...~...~"~.~..~.~-~--.N.+.:...j...N..:...:..j...~-N-N...N...~.:.~...N...N..4...~...N...N ...~...~...~...~..+.~,,, ;'~"'~"' ..~:~: : :-~- -- - -.,...~...~.... .... .-~....,.~..-~.~..~.~,-,, ~ : :': ~-~-~...-~.::::, ~:~ : -.~-.:::::::::::::::::::::,.--,-~--~ ~..~..~..- -..~.:...~-.4-.:-~-..:....:... j.--~-..-~--.:...~-.-~.~..4-~ ..... ~:,:~ ~:: ~ ~: :j~.-~....:-.~-.~--~.-:-.~- · +.?--~..-:-..N.-+..~.-.~ . +-.:-..-~.-N..4...:++..:-+.-N.+.N-+-N.-.---:---~--.~---~-.~---:---~ ---~+-N---~-+-~-+-?+.~+.N.-N---N-.: ~-:---~---:--+--N.--N-+-N..-N-+~--N--.:.--~---~ .... ?--~.'.?-~-..~--.~ ....... ~-.-~ ...+..~-...:..--~--'~'-'~'"?--.?--.~ ....... ?~-+-'~--?'-~'-+-~-'~- ""~-.+-~-~--~-'~'~-~ - ..~...?..~..~..+..~-~...~...F.+.-:...~..9..~...~+..~...~...j-~..+..9..e..~-e..e..~..+..j-.~...~..~-.P+.~...~...9..t..j .......;...:...~....:....L..i.:: . : . ........ ....... ~...i.: ....... : ......... ....... ::'"i'"L":'"'~"":'"':'"J"';'"~'"':':::::: ~ : ..: .;...i...~...~-~...~-:::::: ....i...L..~...~...~-~-..~...~-~:::: , :~?:::: , ...... ~..~....:...~...L..~...~....~..-~..-j.--~...:...~...-:...~....:..-i....:..-::::: ~ . : : :~: : : : ~ : , : :j-::-...N.~...~..~...-:...S..~-.-~-..:., ~ : : : :j:-~-..~..-~.-.:....h.-.:--~-.-.~.--.Nl::::::: :,":'":"'" :'":': :'" a": ~:~::~: :': :'":" 7:--:": .:..F:..:...:..:..:..:~::...:...:...:..:..j...:..:..:..:..~...:...:...:..:...[..:..:...:.~.:..:..:...:...:..N..::.:..:..:...7:. .... :"':'":-":"'?:";'"": ...... '":':"-:'":"'~'"'?-':":":"':'":'"';"'2'~'":'":":' i: ?'2:":": ~-:'-~'--'2-i-'-~ ':"-';: ?'--:--': ~' :--~': ~--~-":"-:"-: :': '~"I'"'~":": ': ~ :"'"':': ~:: :"i 'i'::: b":'":"':"-?-'-:":'":'": ....... ?:--:--.?.--:-...?.¥.:.T-,--.:-.-:---,--.?:.--:-:.--: J :---:--.:--.:--, ~-~ ~.--:---:---: .:----:, :.--:---:-~--:---: ~ ~---.:---~----,----: ~-: :-.-c-:.-.-a--:: c-:---:-: f:: ~--:-,-:::: -":-":---:'--:.-'r-:'-':'":"-: ..... r'-:-"r-:-'-r-:'-:---:'--:-'~---:'--:'-':'::: :':: ~:::: :i:::: ::::: :': :::' :::'":'"~ E::': :::: :': :"~:: :: ::: i':']:::: ::::: :'":"" ?000 PROJECTION ON VERTICAL PLANE 22;>. - 42. SCALEO IN VERTICAL OEPTHS HORIZ SCALE = 1/1000 IN/FT NO~?H ~000 lO00 -101~ .... WELL NAME: IK-b SURFACE LOCAT ION: R£F O00070~6S ~ -' FNL, 222' FEL, S19, T12N, Ri( UM HORIZONTAL PROJECTION $CCd_E = l/lO00 IN/FT -20~] -9O00 -4000 -SO00 SOUTH -6000 · *--.'-i.-*+-+-+--..f--b--H.b-~-H4-H-. -b4-b.' -4--. -H.' :. i :. [ }: i ! ~ i ..4..-4-i--~4..L..k~_:,_ -LS.k..L2i-.j_ -.Z2,_L4._ .-i-4-1-i-Lk.i-J,--i__ ':-L--L~i_~_~_ --.~.-,....?-?- ..-.~...i-.~~ .~.--.j--.~--~*...,[,~.i...4-.-b-4-- --i--,b-;,--.4.-,..'- ~ ~ i i -'. ! .... -- ---i ~ -~ -~l~-b-4----b,.-z~ -: : : : 4 4--4.--4--4-- ~ : : ' : : : : : : : : ~ : ""Y'T' T"T'"*'"T'T'T%'" -'!:--?-'t'?- '~.'--?'"?-Y-' '-~-.?' :-TRr..-,-.,:-T-r~?-%- --?.--?--r-. - -r..-T'T".'::-, ' .-?-~. ~'-'~~??-r- ~.-,--r.. -,.!-?--,--??- --e--_-:'--.',-t-j--.F~-...H-~---. ~-..' -F-ff.'~-..i~.'--~?--f-: .-.i--:,---.'k-.?'---!..-.t-+~.Ht'--.4-:'b~-.~-H;...Hb.---.'-i.-..'!-+.-!-t-: +-+' .-.-k--.?"-~,."-4-~ .4..+-.~.+., ..4-H..b .-H.b' -~.-i--4-1--.k4-~.4.4-.4--b4..4--.-4.-i....~.4-,,-..~.~..4_.~._....4..4..4...~LL.i_i,...:... ...?"--½...p.-.b.4-i-4--..~--.i-4..4-a~' ..4--k.4--b..-~t-i-.:--.:--4.-.-i-.~' 4...4.....i....~-~4-.k--;-i_a_4._i.4__a4_4.~_i_-.4~i--4-~_L.i..-.L-.~.4_~ -: :' -" ~ "'I':-?"'T'%: ..... '..'"T":*"~-'-- ,-~?'".'r"~-l"~"?"?-?--:--r-.'-?'.'t~ :: .~ i i--+'.-??m.-~+~.' +.',, i i i- ! .-~+-.-4-+-..f-H.~- -b+-t-t'.-!-.-½-k-H ..... ~---kHr+-i-'+'i .... H'-+H"-+-;'-'.:"+:.--H;;+;.-Hr+'...'k-H..'P--.i.:-H.." ..:--~+ l; ii l-~+-.b ~ i il ~-~-t-.b..: ,:"-b: b. -i-f':"t-t-'[.-'i-'t..i-t-. ,--+-?.i-'f--~-i---.'t .-t-t---i:-~--P.-!-e-~: .'t----t:-'t-t-~: y-t--%'H--!-:~ ! ! ! ~ : [ ~ ! ! :. ~ ,, :' ! ! i -,~--~--:, .-" ~ :. i i i ,-,4---..k~i--b-..~-4 :' --' .--.h4--.;.4 .... i.-.{--.:.-..i.-.4..i....i...i.j...i....i.-4-..,~.-..i,-..L..i--; ..... i-.L.4~, '; .i--i-~,---~. 4---L-..i.--[--': .Z. i ..Z J, .i-.-i..~-.J,..--J, ': i '~ ! .~-'.i-.i-~- i ~ ! ~ , .: i -: ~ .: .: ! ! i i i i ...... HH-v'H'H ....... H H.H+H ..... ...~-..t ..... t ........ +.-~...? ..... .:-+..~-..~--t---+.-+.+-.H.-+-~-*+++-~---t--t...?-~--~-~-+.'4-. +-.=~--~z-L~.j-4 ........... k*~.-.~* ..... ~_ -'~-?~-,...-',. ..... *-T---~-~., ---',~-'t'.-.?.?- -.~..-,-----? ..... ~.-?-?-?... -~..?-~--[.----~.~.-,,-,,~.,.~/ ~-..i- i ; -,~4--~---b..4-- .-~-.4-.a : :. .... - .... . ..-4-..i--4..~ .... :::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::: ~Z-T...~ ~ZX.--:~.:-."::..-T-: _TZ,_T~:.; ..i%-~:i ~_z:~¼~; -"i-'+-H.-f++'.H ...... ..:`~...~.....:~.~:.~i~.~.:.~i...~....~.~.:`.-.~....~.~...~..;-.i...|-..4-....;~`y-.~P~+~i-.~4-~-`-~..4-~;~4~4~.~ i i-~-b!.~ '. '.- ..... .~"+'+.-t..-?"-+'+'+- '-?'-+'+'+'T"':"+''i-?' ....... ,:-.-H-.-'.-+,.,-~-.+-?'-t.:,z?"v.:F-½--4.:--t-H+--~-H -4-i --."-?"---Hb4.'- .:~-4---~--4-~-}-4-.;-- H.~.- -4--;-.;.4..+-4-.~4-~. .......... ,.l..,_.,,_.,~ ...... .; ................ L~..~.i..~ ........... .~_; .......... L~..,,L~... _., ..... ~,-..~.-L~-"..~-~.-.:.--.~-.~..:..4..4-L-'/LLz...L:-LLZ'-'-'-'-'-'-'-'-'-~L~LJ...L.".I L.i_.I i-L I. .+H.H.--i--¢--.'.H ...... H---.:.--.f4.H--H ....... H--H-..H.~4---.-+H-H-4-H--t:-- 4-.H-H-4-+-f-+.--.-...-"-f~bi+?+ -+-:.;-~q---~--HZ--+~~- l''4'--~''''~""~'''e''''~--~'''~''''~'l' "':'--'P'''b''~'''l'":'"'~'''~''~' ...... ~'".:,...'~.--~'--'[I.';,X'~'*~'.'4~..--:,l'';'..'~'--4''--.~.~ "4--.~'..'~.. --*;'''~--'~'--'~--''1"''':--"~--':--'--~"i--"~--'k'''~--~--~-- ".'~':"'"~"b'-'i'--'~'"b'"i' ..... ' ..i.~4,--.L..L.,i-- : : : ~ ...{-.}-.H..H'--~.--bb--?.-H-.-H-.-i--l{-.--}--.i ...... i-.-!.-.i/.~-H---.----b;.-hH---b;--f4.- 4--¥.b4-k.i-.-M-¢-.--l..¢-4.4.-:-.li.4.-~4....-.i.'"-;l.4...'k,La;b [ I [ ~ ]" ~ ] ] [ ? I I ~ ..... ~ I I I ? I [ ] ~ ' ] ~ ....... ~ ] ] I ~ ] ] [ ? [ ] ] ? ' [I ~ I [ I ?III ? il I '[ ] ] ] ~ ...... ? ~ ? :.,-l--il.-:---[-~.:-,. "'?--'.?-?"'~'"--.:-T-.1.-.-y--?-.T-T.-?-y-T-.....-.:~..m"''''?'l--F~'''y',"?'"?--ll~'--F''R.--~l. '''~--'~--t'' .1--U'T'T~' '--?--%T~'''i~?.?--~.~- :::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::: "~i::::.:':::~:i:i::: Z:~?:ZtXz-.;::~Y :~:2:t~Z~:.-;:::: ::i::~:t::~Z.t:::;': ::";:±?_:~J:::~:.--::: ..i-.L;..;.4...:...;...:...; ....... ;...;..4...LI...;...;...;...;.~..T..'-'ii4...-L~.4.4......;...;..4..H-~...;...-aL;...;-4-L;-.;...;..~ .4..;.:..'...:LL -~L;..-L_ ..g-.Li...L.I_.i-L-LL-Li.-L i..i..Z*.. * J... · :::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::: ::~::..:-:::!:!:::I:~Z: ~.~Z.~~ ~:.:_.i_:~::~: ::::::::::::::::::::: :~%:~:::i:~:F-',:-,~ -;..b.'.;..b;....H...bb ..-b.;---b-~-..b-?--~---l-4-..:.4-4-.4-~-,-b~ i !'! I ! ! ', ! i ~: ~b~4-- "~-' ~"¢'"~'"i'" ~'"i'" {'"~ ....... {l..~ ...{...~...i ...~... ~ ...?i ... ! ...I ... ! ... ~...~...~... ,~...~.[* ~.~..b..'.~.. ,~ ! ~ .~ [` .~..i~._~..~.[ ..]...~...~._~..~ ..~.~. :_~.~.:l' .~..' _~ .i...¢...~......[...~......l~...~._ ~...~....~._ .~,_4_ .[l~L~...i _...~.~l.._~...{...{._ .~.i.~... ~.- ..4-+.-b--~..-]..--:,..--W,.-.-} ....... 't.--4.-.¢-.'b..?,..-.L4-.-H.',-~---~---:L-::-.-i '.--!~--b~- i :'..F4-+-]-4~ :-bH':--::-4-:'.-b+-.b4-4--F-H.-4-~-4-4--F-b-4-4-~-~4-4-4~."-.u-?:-4-:i-- i....; ....~.-~. .... ~* ....... '&,-.~ .... i,-,~*.,,"~'"'~,-J~-.-'~--~-.,~*'.-'~ .... '~--,---',--~- *'---:,---~ *'--':..-,-4--4---;---~ : ~ : ~_.;.--.; .'.--'_ :_.L.L--~- --~-t--':---:,--+.4..4--='-:"t ']'L: i L .:..--:. ;-_~-.:., -i L.4-4.J.~ ;. ': i ....~ ~.;,....;...~...: ....L..~ ...;......; ... {... ~ ... ;....~....~ ,., .:...-L .~...~;...~....~...: ....... ?...4.,.4-.4....4...4...4.- ....~ ~-.4-4-.1-..}.....~..-.p.-4~-....~ ....~. _.a _ a _i_ ~._.4_..;.....a.. L. ~....;~ -.~ ...;.. - 1 ....~....:;....,-.4 .-1 ..~...~....~... ~ ~.~ ..~;....p...:....;...~t ....~..~....:...-;..4 ..,z..;.....;....; ..../ 7T'T'-i'T":'"!"'i '"?T'7"T":'"~'77"T'T'TT"T'T-'Pi'-'T'T"T'Y -~"T'T"T T":. " ':"F T'T'" '-F'T'T"?'"?: "T T"-'.. -T'' -T'T'-;'"'YTT'T'T'TT'?'T"T".FYF~~-:/'?'i : ....... ;...L~.. [..L.L..;..L.b.L.i..i..; ....... L.'Z..LL.!..L.L.L.L.i....L.LL.[ ....... L.-:.-.._L~.J..L.L..!....L ........ ;..L...L_L.L..L.L.L.L...X..L.L.L.i...L.L.L-:...LL:.....L._L_L.L.~~.:Y.I j ...~....~...i_.t...i...i....L..!...i_Z..L_..:,..i.......L.: _i_.~..i_ ,~ ..L.L..L. :...i...i...L.j, .; ~ ~ i_l i L .:, ...... t ~ ~ ~ I .............. · "t'+"!'"?"i'"H:'+':; ...... H'"i'"H---i ~,~, ~, ~ ~ ~ ~ :,, ~:~ '"l'r, ~ rllrl',?":1 '-r--~-l-r-1.'r-r-'?-:.---?--'?ll-l'?--lr'l:'--~---r-'::--?-F::--k-?-~-?'--?l--?:-lT'-:.:-'':-- ::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: -SO00 -4000 -3000 -2000 - 1000 0 1000 2000 3000 WEST EAST Suggested form to be inserted in 'each "Active" well folder to check for timely compliance with our regulations. OPERATOR, NELL NA~ bLND -NUMBER Reports and Materials'to be received by: Date --. Required Date Received Remarks Completion Report' 7 Samples -- · Core Chips -- Core Description ~ ~~ " , :/5 .e ~,st~,~ ~s~ .... r~y ~,a, Inclination Survey _ ~ ~ .., ~ ~l~ Directional ~urv~ ~ Dr~ll S~t Reports Production Test Reports ARCO Alaska, In¢ Post Office~_"~__ 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 May 20, 1985 Mrs. Elaine Johnson State of A1 aska Alaska Oil & Gas Conservation Commi s s i on 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Conductor As-Built Location Plat Wel 1 s 1-16 Dear Elaine' Enclosed is an as-built location plat for you have any questions, please call me at Sincerely, Gruber Associate Engineer JG/tw GRU6/L115 Enclosure - 1R Pad the subject wells. 263-4944. If ARCO Alaska, Inc. is a Subsidiary o! AtlanticRichfieldCompany N O R T H DRILL SITE iR SCALE:: 1"=300' AS-BUILT CONDUCTOR LOCATIONS WITHIN SECTIONS 17, 18,19 8 20, TI2N,RIOE, U.M. NOTE: COORDINATES ARE ALASKA STATE PLANE, ZONE4. SECTION LiNE DISTANCES ARE TRUE. HORIZONTAL 6 VERTICAL POSITIONS PER L.H.D. SURVEYORS, DOCUMENT NO. 129: N 19'!'69 N 17+25 E 9+56 a E 15+25 EL. 50.39 EL.38.75 WELL Y=5,991,050.09 Lat. = 70°23'!1.$70" X = 539,829.76 Long.= 149040'33.808" SEC. 20 -- 154'FNL, 139'FWL WELL 2 Y = 5,990,990.16 L~t. = 70°23'10.781" X = 539,829.82 Long. = 149°40'$:5.816" SEC. 20-- 214'FNL, l:58'FWL WELL Y = 5,990,930.24 Lot = 70°2:5'10.192" X = 539,829.78 Long. = 149°40'3:5.826'' SEC. 20-- 274'FNL, 1:58'FWL WELL 4 Y = 5~990,870.26 Lot. = 70023'09.602" X = 539,829.77 Long. = 149°40'33.836" SEC. 20-- 3:54' FNL, 1$7'FWL WELL 5 ¥ = 5,990,870.21 Lat. = 70°25'09.620" X= 5:59,469.75 Long.= 149°40'44.$77" SEC. 19 -- $:52' FNL, 22:5' FEL WELL 6 Y=5,990,930.21 Lot. = 70°25'10.210'' X= 539,469.74 Long. = 149°40'44.368" SEC. 19 -- 272' FNL, 222'FEL WELL 7 Y= 5,990,990.2:5 Lot.- = 70°23'10.800'' X = 539,469.76 Long. = 149°40'44.358" SEC. 19 m 212' FNL, 222'FEL WELL 8 Y=5,991,050.20 Lot. = 70°25'11.390" X= 5:59,469.7:5 Long. = 149°40'44.350" SEC. 19 -- 152' FNL, 221' FEL WELL 9 Y = 5,991,600.16 Lat. = 70°25'16.800" X = 559,469.91 Long. = 149040'44.259'' SEC. 18 t 398' FSL, 216'FEL WELL 10 Y=5,991,660.11 Lot. = 70°23'17.389" X = 5:59,469.82 Long.= 149040'44.255" SEC. 18 -- 458' FSL, 216'FEL WELL II Y = 5,991,720.17 Lot. = 70°2:5' 17.980" X = 559,469.81 Long.= 149°40'44.244'' SEC. 18 -- 518' FSL, 215'FEL WELL 12 Y= 5,991,780.16 LOt. = 70°2:5'18.570'' X = 5:59,469.78 Long. = 149°40'44.2:55" SEC. 18 -- 578'FSL, 215'FEL WELL 13 Y = 5,991,780.16 Lot. = 70°2:5'18.551" -X = 539,829.73 Long. = 149°40'33.695'' SEC. 17 -- 576' FSL, 145'FWL WELL 14 Y=5,991,720.13 Lat. = 70°2:5'17.961" X = 5:59,829.71 Long.= 149°40'33.705''' SEC.17 -- 516' FSL, 145'FWL WELL 15 Y=5,991,660.19 Lot. = 70°23'17.371" X= 539,829.71 Long. =. 149°40'33.715" SEC. 17 -- 456' FSL, 144'FWL WELL 16 ¥=5,991,600.20 Lot. = 70°23'16.781" X = 539,829.77 Long.-- 149°40'$3.722'' SEC. 17-- 396'FSL, 144'FWL CERTIFICATE OF SURVEYOR : 18SSDI], I t-iR R EBY CERTII=Y THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA ~k~%l D THAT THIS PLAT REPRESENTS A LOCATION SURVEY MADE BY ME OR UNDER MY SUPERVISION, AND THAT ALL DIMENSIONS AND OTHER DETAILS ~ ARE CORREC'F. ~1~, ................ CHECKED J. HERMAN 3340Arctic 8oulevai'd, Suite 20~, Anchorage, Alaska 99503 JlJ°B NC). 85029 KUPARUK ,- : SURVEYED FOR: Afl¢O Alaska, Inc. MAY 9,19851 .::!':__~..-,. DATE: o.~w. J. oAv~s, ~.~~ ~o~: ALASKA OILFIELD '- _~,ELO .OOK A.0.S. 0~-85! SE£VICES~,~,.'-'!,~ ~:~.,-~ ~. ~:~.::: · . ~ .'.:;~; . , MEMORANDUM State -of Alaska TO: THRU: ALASKA OIL AND GAS CONSERVATION COMMISSION C. V./~~terton Chai~/~~ Lonnie C. Smith Commissioner FROM: Edgar W. Sipple, Jr _/,.~.. SUBJECT: Petroleum Inspectork~,-'/ DATE: FILE NO: TELEPHONE NO: May 13, i985 D.EWS. 35 Witness BOPE Test on ARCO's Kuparuk 1R-6, Sec. 19, T12N,R10E,L~4, Permit No.~ 85-71, Doyon Rig 9. Wednesday, May 8, 1985: I traveled this date from ARCO's Kuparuk 3B-5,' '(subject' of a~0~her report) to ARCO's 1R-6, Doyon Rig 9, to witness a BOPE test. The drilling contractor was im the process of nippling up. The BOPE test commenced at 7:40 am and was concluded at 8:40 am. There were no failures. I filled out the AOGCC BOPE inspection report which is attached to this report. In summary, I witnessed the BOPE test on ARCO's Kuparuk 1R-6, Doyon Rig 9. Attachment 02-O01A(Rev. 10/79) 0go 5/84 STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMbIISSION B.O.P.E. Inspection Report Inspector Operator w~ I f~ Location: Sec / Drilling Contractor Location, General Well Sign if-- 6 Representative..~t /~/~ ~' ~ ~'~J~ Permit ~/ ~_~.// %q~-~ . ,. ~ . 7 w ~as~ng S~t ~ ~$9 ~t~ / .:. ACC~LATOR SYSTEM General Housekeeping ~j Rig Reserve Pit Mud Svstems Visual Trip Tank Pit Gauge Flow Monitor Gas Detectors Audio BOPE Stack Knn~'Prevent er Blind ~ms Choke Line Valves~ H.C.R. Valve 1 Line Valves eck Valve Test Pressure 3~Do o Full Charge Pressure ~~ psi~ ~~~ Pressure After Closure 7~o psig !~o Pump incr. clos. pres. 200 psig ~,~ mzn.&~ sec. Full Charge Pressure Attained: ~.mzn' ~'~sec. ~ ~.~ ~ ~ ~ - ..... Controls: Master ~//~ /~ <~i~. Remote~f Blinds switch cover ~ Kelly and Floor~afety Valves Upper Kelly~ ~ ~Test Pressure r ssure Ball Type ~ ~fest Pressure Inside BOP ~_~ ~r~st Pressure Choke Manifold ~f~Test Pressure No. flanges ~ Adjustable Chokes J A~ Hvdrauically operated choke'/~N ?~ Test Results: Failures ----O ----- Test Time / hrs. ~ ~O. /~% {~ Repair or Replacement of failed equipment to be made within ~IA. days and Inspector/ Commission office notified. Remarks: Distribution orig. - AO&GCC cc - Operator cc - Supervisor Inspector ~~j'~-.~.j~.~ / April 23, 1985 }-fr. Jeffrey B. Kewin Area Drilling Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510-0360 Re: Kuparuk River Unit 1R-6 ARCO Alaska, Inc. Permit No. 85-71 Sur. Loc. 272' F~IL, 222' FEL, Sec. 19, T12N, R10E, 1%i. Btmhole Loc. 1031' FSL, 934' ~qL, Sec. 19, T12N, R10E, UM. Dear Mr. Kewin: Enclosed is the approved application for permit to drill the above referenced well. If coring is conducted, a brief description of each core and a one cubic inch size chip from each foot of recovered core is required. Samples of drill cuttings and a mud log are not required. A continuous directional survey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs,-velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.05.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's Office, Department of Fish and Game. ? Pollution of any waters of the State is prohibitedby AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to commencing operations you may be contacted by a representatiVe of the Department of Environmental COnservation. Mr. Jeffrey B. Kewin Kuparuk River Unit, 1R-6 -2- April 23, 1985 To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Very truly yours, C. V. Cha-t~rtion~ Chairman of Alaska Oil and Gas Conservation Commission BY ORDER OF THE COI.~ISSION lc Enclosure CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Mr. Doug L. Lowery ARCO Alaska, Inc. ~ Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 19, 1985 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Kuparuk 1R-6 Dear Mr. Chatterton: Enclosed are: o An application for Permit to Drill Kuparuk 1R-6, along with a $100 application fee ° Diagrams showing the proposed horizontal and vertical projections of the wellbore o A proximity plat o A diagram and description of the surface hole diverter system ° A diagram and description of the BOP equipment We estimate spudding this well on May 3, 1985. If you have any questions, please call me at 263-4970. Sin rely, · Area Drilling Engineer JBK/HRE/tw PD/L67 Attachments ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA'~;:::~IL AND GAS CONSERVATION CG~iMISSION PERMIT TO DRILL 2O AAC 25.OO5 la. Type of work. DRILL FX]X REDRILL [] DEEPEN [] lb. Type of well EXPLORATORY [] DEVELOPMENT OIL [~X DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC I~ SINGLE ZONE [] MULTIPLE ZONE ~X 2. Name of operator ARCO Alaska, Inc, 3. Address P. 0. Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 272' FNL, 222' FEL, Sec.19, T12N, R10E, UN At top of proposed producing interval 1445' FSL, 1324' FWL, Sec.19, T12N, R10E, UN At total depth 1031' FSL, 934' FWL, Sec.19, T12N, R10E, UN 9. Unit or lease name Kuparuk River Unit 10. Well number 1R-6 11. Field and pool Kuparuk River Field 5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no. RKB 84', PAD /+7' I ADL 25635 ALI( 2568 12. Bond information (see 20 AAC 25:025) Federal Insurance Company Type Statewide Surety and/or number #8088-26-27 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 30 mi. NW of Deadhorse miles 934' ~ TD feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 9088' MD, 6925' TVD feet 2560 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures KICK OFF POINT 750 feet. MAXIMUM HOLE ANGLE 45 O l (see 20 AAC 25.035 (c) (2) 21 SIZE Hole I Casing Weight 24" I 16" 62.5# I /4" 12-1 9-5/8" 36.0# i8-1/2" 7" 26.0# 22. Describe proposed program: Proposed Casing, Liner and Cementing Program CASING AND LINER Grade Coupling/ Length ! MD H-40 Welc~ 80' 35' J-SS HF-ERW J-55 BTC/ 9054' 34' HF-ERW Kuparuk River Oil Pool Amount $500,000 15. Distance to nearest drilling or completed R-5 Well @ 1157'TVD ~-0 feet 18. Approximate spud date 05/03/85 2R70 psig@ 80OF Surface _~_990 psig@ 6600 ft. TD (TVD) SETTING DEPTH I QUANTITY OF CEMENT TOP TVD MD BOTTOM TVD ! (include stage data) I 35' 115' 115' .b~200 cf Poleset I ~ · 35' ~ ~Y' 1390 sx Permafrost, "E" i ~G;5'~'I 3t~O ! 425 sx Permafrost "C" I 34' 9088' I 6925' I 280 sx Class G neat I I , , I ARCO Alaska, Inc., proposes to drill a Kuparuk River Field development well to approximately 9088'MD (6925'TVD). A 20", 2000 psi annular diverter will be installed on the 16" conductor.~hi]e drilling the surface hole. The 9-5/8" casing will be set through the West Sak Sands at approximately J~D (~'TVD). A 13-5/8", 5000 psi, RSRRA DOPE stack will be installed on the 9-5/8" surface pipe. It will be tested upon installation and weekly thereafter. Test pressure will be 3000 psig (3000 psi for annular). Expected maximum surface pressure is 2870 psi. Pressure calculations are based on latest reservoir pressure. Surface pressure is calculated with an unexpanded gas bubble at surface, including temperature effects. Selected intervals will be logged. The well will be completed, using the workover rig, with 2-7/8", 6/5#, J-55, EUE 8rd tbg. Non-freezing fluids will be left in uncemented annuli through the permafrost interval. Selected intervals will be perforated within the Kuparuk formation and reported on subsequent reports. A downhole safety valve will be (see attached sheet) 23. I hereby certi,~y~at the foregoing is true and correct to the best of my knowledge SIGNED TITLE Area Drilling Engineer DATE T h e sP ace~J~w~f~/~,n~ssion us/e j'~ CONDITIONS OF APPROVAL Samples required Mud log required ~ Directional Survey required ~ APl number ~YES ~NO ~YES ~O L ~YES ~NO I 50- ~/~3 / Permit number __ ~ _ . Approval date ~~ ~ ~ 23/85 SEE COVER LETTER FOR OTHER REQUIREMENTS APPROVED BY /'//T/Y ~ ,COMM'SS'ONER DATE April 23, 1985 ~. -/, ~'~~~~ by order of the Commission Form 10~01 (HRE) PD/PD67 ~ ~ Submit in triplicate R~v 7-1 -RQ PERMIT TO DRILL 1R-6 installed and tested upon completion of the job. 1R-6 will be the second well drilled on the pad. It is ±40' away from 1R-5 at 1157'TVD. There are no other close wellbores anywhere downhole. Top of cement for the production string will be placed at 7276'MD, approximately IO00'MD above the top of the Kuparuk Sands. Reserve pit fluids will be disposed of down the 9-5/8" x 7" annulus. The 9-5/8" x 7" annulus will be left with a non-freezing fluid during any interruptions in the disposal process. After the completion rig has moved off location, the well will be fracture stimulated. C E iV E D APR I 9 1.985 Alaska 0ii & 6as Cons. Commission . . 1 --i j t j. . . 1 J j. . . . . ! . j. . . J · J. . . i m Surface Diver:er S~s:em [. [6" - 2000 psi Tankco s:ar~ing head. 2. Tankco quick connect ass¥. 3. 16" x 20" 2000 psi double studded adap:er. ¢. 20" 2000 .psi drilling spool w/lO" side outlets. · 5. 10" ball valves, hydraulically ac:ua:ed, w/lO" lines :o reserve pi:. Valves to open automatically upon closure of annular preventer. 6. 20" 2000 psi annular'proven:er. · 7. 20" bell nipple. · h Maintenance & O:era:ion Upon initial Insl~llation close annular preventer and verify that ball valves have opena properly. Close annular' preventer and blow air through diver:er lines 'every 12 hours. Close annular preventer in the event-that gas or fluid flow to surface is detected. If necessary, manually override and close ball valve to upwind diver:er line. Do not shut in well under any circumstances. Conductor < < J 7 6 > > ACCtJldJLATC~ CAPACITY TEST I. CI-EC3< /NNI) FILL ~TCR ~L ~TH ~IC ~UI~ 2. ~ T~T A~AT~ I~ ~I ~~ ~ T~ ~T~. 3. ~~ TI~ T~ 4. ~ ~ ~ ~T, T~ AC~~ L~ ~I~T IS 4~ ~~ ~I~ TI~ ~ i~ ~I ~I~ 5 4 3 2 !:~-5/8" BOP STACK TEST I, FILL ~ STACK AIND ~ MNNFIF~ WITH AEC'TIC DIESEL. 2. CI.-ECX TI~T ALL LOO< ~ SCl:~ IN t~t~..LFE. AD FLLLY ~'TRACTED. E~AT TEST PLUG IN I~_LLFE_AD W3TH RUNINIING JT /NND ~ IN LOQ<EO~ 3. CLOSE ~ PREVE~ AN) MANJAL KILL AN) O-D<E LIME VALVES ADJACF_NT TO BCP STAC~ ALL 031-ER 4. P~ESSt.I~ UP 'to 250 PSI AND HOLD FOR I0 bEN. IN- C~_ASE PRE~q~___IBE TO 3000 PSI AIND HOLD FOR I0 MIN. BLEED ~RES~B.I~ TO 0 PSI. 5, CPEN ~ PEEVENTE]~ AI~ MANJAL KILL AND LI~E VALVES. CLC6E TQm PIPE P. AM~ AND HCR VALVES CN KILL AND CHO<E 7. CC~IN.E TESTZNS ALL VALV~S~ LI~,S, A~D WITH A 250 PS~ LOW /NND 3000 P~! HI(SN, TEST AS IN STEP 4. DO N3T ~E'~SLI;~E TEST ANY O-E3K~ THAT IS FI~TiON lES1 Q-lO<E5 THA1- DO t~1 FULLY CLOSE. CPEN TCP PIPE RAIVB AhD CLC6E Bo'FrcM PIPE RAI~. TEST BOTTCI~ PIPE RAIvB '[0 250 PS~ ~ 5000 PSI. g. (;PEN BOTTOM PIPE ~ BACK CIJT Rt~NG J'l' A~ I0, O___oE~'_ BLIND ~ ~ TEST TO 250 PSi A~ 3000 PSI. II. CPEN BLII,,D ~ AIND RETRIEVE TEST PLUG, NI~ SURE ~d~IFCLD AI~ LIh~,S ARE FLI..L CF NQN-~EZING FCUICN SET ALL VALV~ IN DRILLING POSITICI~ 12. TEST STANDPIPE VALVES,-I<~LLY, KELLY CCX:]<S, DRILL PIPE SAFETY VALVE, AhD II~IDE BOP TO 250 PSI ~ 13. RECORD TEST It~FORMATIC~ (3g BLO~ PREV~ER TEST FOR1¢, SI(~I, AI~ SEND TO DRILLING St~EVISOR. Y~EEK1.Y TI-~AFTER FLI~ICI~Y OPERATE BOPE DAIL~Y. 510084001 ~EV I IS well located'"proper distance from Other wells ......... · .. i§' suffiCien~~, u~ediCated acreage'aVailable in this ~ool ~ ~. ' ~ ~ -- 2~? I~ well to be ldcated in a' defined?pool .... ..... ~ . :~--.... .... ' .... .~., 3. IS well located,proper distance from prOperty line'~ ...... ;..'.., ..... ~ -~ .... · ;' '.,. .... ~:":V-"-".: ('2 "thru 8) . ~ . .~.-.~ / · ':,. · " .. 8. .._: '(8)'.' - -' t. ,:" :' (3~': Admin '~~ ~--~~ 9 (9 thru 12)',:.',.-. 10. (!0 and 12. (4) Cas~~13~'~'ht ru '(22 thruZ2~) 13. i~. ]5. i. 6. 17. 18. t9. 20. 21. 22. 93. 24. 25' 26° / / 27. Is. well to b~' d~viated and is wellbore plat., included...' .............. ~ Is' operator ~he only affected party ' ;W~ i..~ elle~eee®.e®eee®®®®ee'eeeeee Can permit be approved before ten-day wait ' . ~ .eeeeeee®eee.eee~eeeee..ee · Does operator haVe a bond in force' ..ee®®ee.eeeeeee~eee~ee®®®®ee.eeee .. Is a conservation order needed ' ' · leeeteleeeeeeeeeeeeeeeeeeeee. .eeeee Is administrative approval needed ~ ;~ eeeeeeeeeeeeeeeeeeeeee®eee.eeeeeeee Is the lease number appropriate ~ eele.eleeeeeeeee~eeeeeeee.eeeeeeeeee ~s .conductor strin§ provided ..... ~ ...... , ......... .~ Will cement tie in surface and intermediate or production strings ... /~ Will cement cover all known productive horizons .................. Will surface casing~protect fresh water zones ......... ['1 [ .... ~ ' Will all casing, give'adequate safety in collapse, tension and burst~. Is this well to be kicked off from an existing wellbore ~ ~ .......... , · Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required .......... . .................... ~ ......... Are necessary diagrams of diverter and BOP equipment attached .... Does BOPE have sufficient pressure rating - Test to ~,~9~) ~i~ ..~ - Does,the choke manifold comply w/API RP-53 (Feb.78)..., ............... Is the presence of H2S gas probable ................................. . Additional requirements ' eeeeeeeeee~eeeeee~eeeeee.., eeeeeeeeeeeeeeeee , .. Additional Remarks: ~£AA /~-g ~/~L ,B~' gL5~ ~-'~Z>/~4 //~-~-~/~/~ _.cU/CF,~C~ Tz:, 75b'TZZL9,' C_Z DSE5 7-- e z o $,~' ,O./',°/t' z,,,~,.N ',~w. 0 Geol~ggy: Eng~in..eering: -~ ~ . WVA ~/ '~MTM ~" HJH/~2r~ JAL rev: 03/13/85 6.011 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE , , Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file, To improve the readability of the Well History file and to simplify finding information, information, of this . nature is accumulated at the end of the file under APPENDIX. .. No special 'effort has been made to chronologically organize this category of information. .o * ..... SCh~UM B ER ~R ..... ~ ....................... d L.,~..I .~ .lg85 ************************** Alaska Oil & Gas Cons. C cVP 010.d02 VERifiCATiON LiSTiNG · *- T.APE HE SERVICE NA,~E DATE :85/05! i ~RiG.IN TAPE NAM~ CON'TiNJATi 2N PREVIOUS T~PE : C0 ~M~EN TS : ** FiLE HE.~DER I~E NAM~ :,-.u~.T 00~ ERVIC~ NAME : VERSI~ · : D A 'T E MAXIMUM ~ENGTH EILE T~PE : PREVIOUS FILE MNEM CONTENTS COMMENTS ~:~.- ]JNIT U N_, '~' T 'T Y P .E g A T E S I Z E g 0 gl E Ot,lO 000 015 055 0.0 O 000 0 O ~ 065 OOO 000 007 0615 OOO OOO 003 0,55 000 000 003 000 go0 OOZ 000 OOO 008 0,55 000 0 0,0 0 O l 065 000 OOO 003 0!5'.5 'TYPE CATE S,IZ~ 000 000 001 06.5 LVP 01O.riO2 V~R!,FICAT.I~ON LZ. STiNG PAGE ;2. ~ SCHLbMBER SE2 · · ALASKA COM:PUTI;~G C"NTER '~ COMPANY : ATLANTIC RiC~,FICL3 COMPANY WELL = ~-~ ~iELD : KUPARUK COUNTY = NORTH SWOeE ~OROUGH STAT5 = A:'LASKA J~ NU,M6.SR Al 4CC: 7,34gZ ,RUN .~1, DATE LOGGE'2:1',-MA¥-85 LD~: L.E.CJDN~EY CASING : 9.625" TYPE FLUID = FDLYMSR/WT~. DENSITY = lO.O LB/G VISCDSIT¥ : ,~;,S.O S ~m = 9.0 ~FL'JI~ LOSS : 6.0 C~ 6 Z T S Z Z E : R~ R~'F R~ AT 8H'T 3. 200 ~ 50.0 OF 50.0 DF .~0.0 DF 155. OF MATRIX SANDSTONE LVP 010.~0~ V~RilPiCATiON LISTING PA~i 3 ~,-~-,- YniS DAT,~ ,'iAS NOT 6~r-N,. O,~PTH SiiiFTED - OVERLAYS FIELD,. PRINTS .~,-,-~-'~,-,~ SCHL~M6ERG~'=R LOGS £NCLJDED WZTH THIS MAGNETIC TAPE: ~- DUAL !ND'JCTiON SPHER.iCAL~-¥' FJCjSED LOG (DiL) ~'.: D~TA AVAILABLE: ~555' TS 9Z77" ~ FORM~TiOi~ OENSITY COMPEN,SATE~ LO~ (FON) ~ COMPENSATE~ NE~JT2C, N~ ~ (F~N) LVP OiO.HO2 VERiFISATI~N L.iSTING P43E 4 DATUM SPECZFiCATZCN 5LOCKS MNEM ST-RVi~'E SERVICE UkZT lO O~O~R · OEPT ~T SFLU 2IL 3HMM ILO 3iL 6H,'4M IL~ DIL OHMM GR ~IL -~PI JO ~R FDN &APl CALi PON iN OO RHDB FDN ~/C3 ORHG FON ~/C3 O0 NR~T FDN RNRA FDN O0 NP~i FDN eu OO NCNL FDN CPS FCNL PDN CPS O0 APl AP1 TYPE CL.4SS MOO NO. 000 O0 0 0 220 O1 0 iZO ~6 0 0 .!£0 44 0 0 J i 'J J 1 0 :31'0 O1 O 0 310 Oi 0 0 Z80 O1 0 0 350 02 35-5 01 O ~20 Ol 0 0 ~00 $0 0 0 590 00 0 O 330 31 0 0 330 30 0 SI ZE SPL I 1 i 1 1 I i 1 I 1 R.bLPR ~8 oa 58 PROCESS (OCTAL) O00OO000000000 0000000000000~ O00000000000O~ O0000OO0000OOO O00JOOOOOjOOOJ OOOO000000000O O000000000000J 00000000000000 OJO000000OOOO3 O00000OO000000 0000000000000~ OOO00000000000 00000000000000 00000000000000 OOO000000OO00O OEPT 933.2.. 5000 SFLU SP -6~,. 6z50 GR RHOB -i3:803.0000 ORHO NPHi 3~. 8633 NCNL D~PT 9300.0000 SF~U :SP -68.7500 GR RH05 2.~9Z2 3RHO NPHI 35.05~,6 NCNL O~PT 9200. 0000 SFLU S,P - 5 ,I. ,Z 5 O 0 g R RHOB 2. ~785 DRHO N P Hi 3 9. 2090 NCNL DEPT 9100.0000 SFLU SP -53.3750 GR RHO5 2.,~160 ORHO :N~HI 35.6230 NCNL 9000.0000 SF~U -75.0000 ~R RH'O~ 2 1973 ORHO NPal 30.9570 NCNL D2PT 8~00.0000 SFLU S P -5 ~%. 2 i 8 ? G R RHOB 2.. 4395 ORthO NPHI 30.90,@g NCNL O~.PT 8~00.0000 SF~.U SP -51. 8125 jR ,3.2305 ILD -6:5.187.5 GR -13904.0000 NR~T ,-1~.90. OODO FC?4L 3.Z305 .iL3 -.6,5. ! 8'75 S R 0.1216 ,-1~90.0000 2.24~1 [[LO !13.9375 ~R 0.054T NR~T 211~.OOOO FCNL 2.8789 ILO 1015.5625 GR 0.04.2D NR~T g!O2.O000 FC~L 1!,%.5000 ILO 4,3.7i;B8 GR 0.0093 NRAT Z6~O. ODD0 FC"~iL 5..183~ iLO 2548.00'00 FCNL 6. 0762 £L ~ 102.0000 'f,R 2.~102 -65 .3.04, 4, ;9 --~47.2.50 0 g.0801 -65.i8'~5 3.04~9 1. 9619 113.9375 3~. !891 g.bi33 t0.5. 5625 3.26?6 30'9062 2 .' 8'750 313~.5000 5.08.5 '9 ,2. 9692 163. DO00 ,ILM CAL.I RNRA ILM RNRA ILM CAcI RNRA CALl RNRA iLM CALl RNRA .ILM CALl RNRA ILM CALl Z.?109 0.5000 3.~301 2.7109 3.3301 1. 988.3 0.5859 3,. 85 T4 ~.6953 3.,219 39.Zla7 3.2~ 41 3.33 79 ,5 ,. 300 8 · 5.11'72 NPHi DEPT SP NPHi OEPT SP NPHI OEPT S P RHDB DEPT SP NP Hl DEPT SP RHDB NP HI OEPT SP RHgB NP .H ~ DE P T SP RHDB: NiP HI DEPT SP NP ~I 0 E P T SP RHD~8 N P m.T. gEPT SP RH36 NP HI DEPT 32.9102 NCNL 8100.0000 SFLU -80.5625 SR 3'7.!09e NCNL -6.5.¢375 ~.~395 2.¢.¢1~i NCNL 8500.0000 SFLU -60.6125 GR 2.4082 DRHO 3.~.0620 NCNL B%00.O000 SF~U -513.5938 GR 2.26?6 ORmO 45.,55,~ NCNL 8300.0000 SF=U -59.0000 SR '-999..~500 DRHO -999,.Z500 NCNL 8200.0000 -60.5625 GR -~99.2500 -999~..2500 NCNL - 39 ~. Z500 NC NL 8OOO.OOOO SF~U -999.2500 N£NL 7900.0000 SFLU -6.1. ~0,53 ~R -~'99,. 2500 OR ~0 -399.2500 NCNL 7800.OOOC SFLU -56,.2157 GR · -~99.2500 SRmO -999.2500 NC~L 7700.0000 SFCU 3..t ,499 ,N R ~ T 2136.0000 EC,~L 25.0938 iL2 73.3750 GR -0.0029 NR~T 235!.0000 FCNL 5.2266 85.8125 0.0229 NR4T 2 98,~. 0000 FC Z.i4%5 iLO 123.6875 O..O~lO NR~T 20i5.0000 ~CNL I. 6:516 IL ] !35.'7500 ~R 0.1553 NRAT 16,59.0000 FCNL Z.40~3 12,3..~375 -399.2500 2.5934 ILO i~7.7500 SR -~9~.2500 NR~T -99'9.2500 FCNL 3.77 73 IL D 190.7500 SR -999. !5:00 NR ~T 2.3258 ILO 149.6250 ,3 R ,-999.25~0 NR~T -999.2500 FC~L 3.10:55 ILO i42.0000 SR -999.25D0 NR~'T -999.,Z.500 FCNL 199. 7500 GR -~9'9.2500 NR~T -9'99. 2500 gC~L 3.3125 iLO 2.3023 ~73..0000 21.28i3 73.3750 $.2207 ~87.0000 ~.3281 85.5125 2.5215 123.5875 3-2207 538.0000 I. ,5738 135. 7500 3.58'75 409.25O0, 2.2070 -999. g 500 -'99 '9.2500 -999. 2500 Z. 5645 -399.2500 -99'). 2500 -999- 2500 ..3.,1,599 -~99.ZSgO -999.2500 2.843'7 -999.2500. -999.25D0 -999.2500 2'9590 -999. 2500 -999 - 2500 -99!~,. 2500 3.1074 -999.2500 -~99.1500 -,999.2:500 3.D352 .iLM CAci RNRA CALI RNRA ILM CALi RNRA ,iLM C.ALI RNRA CALl RNRA iLM CALi RNRA IL M CALl RNRA iLM CALI RNRA ILM C AL I RNRA C A,L i RNRA IL M 3.i758 20.3750 9.1~06 3.~2i9 10.3906 2.~252 12.i7i3 3.~258 9. ,~. 0781 2o,1914 -999.2500 -999.2500 2.53 52 -~99..2500 -999.2500 3,.i992 -99'9. 2500 -999.2500 2.7617 -999.2500 2.912i -999..25~0 -999.2.500 -999~2500 -999.2500 LVP OIO.HOZ VERZFiSATI3N LiSTiNG PAGE 6 SF RH~B OEPT S P RHOB NP~I DEPT SP RHOB NPHI OEPT SP RHDB NPHI DEPT SP RHOB N.PHi OEPT SP ~PHI DEPT SP NPHI DEPT SP RHOB NPHi SP RH 0.5 hip HI D~ PT SP -993.£500 NCNL 7500.0000 SFLU -55.1250 GA -393.2500 2RHG -999.2500 NCNL 7500.0000 SFLU -5!5.7500 3R -99'9.2500 ORHO '-~99.Z500 NCNL 7~00.0000 SFLO -55. 1250 -399.2500 -999.Z500 NCNL 7300.0000 SFLU -58.3438 ~3R -999.2500 DRHO -999.2500 NCNL '7ZOO. 0000 5FLU -6B. 8.75-0 ~SR ,-99,3. 2590 DRdO -~99o Z,500 NCNL 7100,0000 -55.062.5 -999.2500 ORHC -.999.Z500 NCmL 5000 GR -',~99. 2500 DRHC ZSO0 NCNL 6900.0000 '-~99.Z500 ORHO -~99.Z500 NCNL 6300.0000 SELij -'09-},. Z.500 JR i, iG '- 999.2,500 NCNL 6?O0. O'OgO SFL,b -5B.7813 GR -399'2500 2R,HO -3~9.2500 NCNL !4 3. i Z 50 3R -~99.2500 NR~T - 999. ? 50 C, : C "4 L i. 34%7 I L 96.06.25 -999.2500 !qR&T -'~913. 2500' FCNL ,Z. 2695 IL 3 I06.56,25 JR -39').,Z500 NR &T -999.2500 FC,~L 2.13.57 iLO 8,~.0625 ~R -9'99.Z500 ~R~T -99'9.2500 FCNL ,Zo,2~22 IL2 89..56Z5 3a -99~..Z500 NR.AT -99~.2500 9C~L 100.0625 GR -99'9.Z590 NR4T -~99, Z.500 FC,~L 3.5,410 ~L~ ,i 1,Z. 7500 GR - '~ 9 ',9.2,500 N R A T -999.Z500 FCNL 2. i~ 6:52 iL2 9,6. 3750 GR -999..~500 NRAT -9'99. 2500 FCNL 3.~375 ~Lg 107.7500 SR -999,.2500 NR;~T -999.Z5~0 FCWL 5. B3:59 ,CL J II5.18 ?5 3R -9g,~.2500 NR'~T -'999.2:500 FCqL 3,.4063 i03./'750 -999.2500 NR-~'T - 399. ;J,SO 0 -'399..Z500 -993.25O0 Z.0137 -999.2500 -999.Z500 1.9717 -~99.2500 -999.2500 Z,.k582 -399.2500 -999.2500 Z.1895 -999..,Z500 -99'9.Z.500 -~99.Z500 -999.2500 -399.Z500 -993.Z500 3. ~3,16 · -99'9. 2500 -'999. ZSO0 -~999. 2500 -9'99. Z500 '-99'9.,2500 -999.2500 3.37'70 -999. Z500 .-999.Z500 3.70'70 -999.2500 -999. E500 -999. Z500 -999.25'00 CA~i RNRA CA~I RNR4 CACI RNRA CA~i RNRA RNRA ,ILM CALI RNRA ILM CA~,i RNRA I~M CALI RNRA .C~L.i RNRA CAL.; RN2.A CALl RNR~ -'39 9. ZSOO i. 95 Si -99.a. 'ZSO0 -999.2500 I. 95 70 -999. ZSO0 -'~9'~. Z5 O0 -999.25'20 ,-99~. 2500 .2.1 .B 36 -99'~. 25'00 -999.2.500 Z.5957 -99'9.Z500 3.%199 -999.2500 -999.Z500 -999.!500 ,-999.a500 3.~1~4 -999..Z500 --999. Z 500 --999. ZSO0 3. 3359 ,-99~.£500 - 39'3. 2500 LVP OiO.HOZ V~RIPICATiON ~iSTING RAgE 7 DEPT SP NP~I OEPT SP RHO6 NPHI DEPT SP RHOB NPHI DEPT SP RHOB NPHi OEPT SP NPHI SP RHOB NPHI DEPT' RH32 N P '~ l DEPT SP OEPT ~H~B NPHT 0 ~E PT SP ~EP'T NPH~ -65.1875 GR -999.2500 DRHG -999.2500 NCNL 6500.0000 SF~O -63.5938 ~R -999. Z500 DRHO -999.2500 NCNL 6~0~.0000 SFLU -63.2500 GR -999.2500 NCNL 6300.0000 3FLU -6w.5000 3R -999.2500 ORHO -999.2500 NCNL 6ZOO.OOO0 .SFLU -6Z.5313 GR -999.2500 .ORHO -999.2500 NCNL 6100.0000 SF:LU -6Z.3750 GR -999.2500 DRHC -~9~.Z500 NCNL 6000.0000 SF~U -63.09~8 GR -999.2500 ORHO -999.2~00 NCNL 59OO.OOOO SFLO -6,Z. 9687 ~R -999' 2500 DRHO - ~ '9 ~ ,. ,Z 500 N £ N.L 5'~00.0000 ,SFCO -6~. 7500 ~R -99'9.2500 ORHO -999.2:500 NCNL 5?oD.g000 SFLU -69.3125 gR -999,.Z500 ORHO -999.2:5~0 NCNL 5500.D0~0 SFLU -69.3750 GR -999.2500 ORhC -~99.2500 NCNL %.1211 102.9375 SR -999.2500 ~R&T -999.2500 FCNL ~.i9i4 I0'~.~375 - ~9 9. 2500 ;.~R.~T -'~99.Z5,00 FC~L 3.~i52 ZLD 101.6250 GR .-99~.Z500 NRAT -999.2500 FC~L 3.3887 IL:2 i0~. 5000 SE -999.2500 NRAT ,-99'~. 2500 FC~L 2.6730 ILO 94.i8'75 2R -'~99oZ500 NRAT -999.2500 ~C~L 2.70,5I ELD iO7.OOOO SR -999.2500 NRAT -999.2500 FCNL 92.87 50 ~gR · - 99 ~..ZSO0 .;4R &T -999.2:500 FCML 3.ZSZO iLO I01..18'75 gR -999. Z500 NRAT -999.2500 F£~.L 2.3691 .ILD i0'7..9~75 GR -999.Z500 NR~'T -999.Z500 FCNL Z.95,31 :iLg -~9~.,2500 NRAT -99~.2,500 FC~L 3.g9,61 ILO 11~.87:50 9R -'999..Z506 ~RAT -999.2500 FCML -999.2500 ,~. 2891 -999.2500 - 999. 2500 3.?1~8 '-~99.Z500 -99:).2500 -:999.Z500 -999.Z500 -99~.Z500 3.07.52 -9~9.250.0 -999.2500 -999.2.500 2.8965 -999.2500 .-999.Z500 -999.2500 -999.2500 -~99.Z500 -99'~.2500 ~,'~668 -999-2500 3.0781 -999.t500 -999-Z500 3-1309 -9'99.2500 -99'9.2500 3.27i5 -999.Z500 -999.2500 -'999.2,50~ ILM CALl iLM CALI RNRA ILM CALI RNRA CALI RNRA iLM CALl RNRA ZLM CALi RN, RA .I LM CALI RNR4 ILM C.AL i RNR A iL M RNRA ,i LM CALI RNRA CA~I RNRA 3.7Z~5 -999.2500 4.Z187 -999.Z500 999 ~500 3.5957 -999.2500 -99~.£500 3.6719 -99'~.Z500 -999.2500 -999. 2500 -999. ZSO& -999.Z500 -999.2500 3.Z3~5 -999.2500 3.30 Z 7 -:}99. Z5 O0 Z. 9 ~5,Z 9 -'99'!~. 2500 -999.2500 -999.2500 -99~.Z500 _ LVP OIO.HOZ VERi:FiCATi3N L.~.S'TiNG PAL;E 5 DEPT 5500.0000 SFLU SP -65o06Z5 RHSB -)99oZ$00 DRHO NPMi -~9i. Z500 NCNL DEPT 5 bOO. 0000 ,SFLU SP -68.B125 GR NPflI -~99o 2500 NCNL DE:PT 5300.00'00 SFLU SP -66.. 7500 GR RHOB -)9~). ZSO0 .~RHC NPHI -~99. Z530 NCNL 3EPT 5ZOO.DO00 SFLU SP -69.5625 GR NP~I -~9~.2500 NCNL ~EPT 5100.0000 SFLU SP -70.8125 JR RHGB -999.2500 NP~I -9'9~.2500 NCNL .OEPT 5000.0000 SFLU SP -65.1250 SR RH~B 2",Z~88 ORSG NPHI 49..2676 NCNL gEPT 4900.0000 SFcU SP -65.o250 GR RH~B 2.Z7')3 gRHO NPHI 3'7,9883 NCNL D!EP'T 4800.0000 :SFLU SP -64.,~375 GR RHiSB 2.Z109 ORHO NPHI ~'7. ,31~5 NCNL OEPT ~?00.0,000 SFLU SP -69.,Z500 R:H~B 2.18'15 9RHO NP i 41. t6,ZI ~CNL DEPT 4523.5000 SFLU :SP -49., 6563 GR NP H I 50.000 O NC NL EILE N~MF£ :iED IT .001 Z..55,~3 IL 3 i05.5750 .GR -99~.Z500 NR,~T - 9'9 g.,'Z5 O0 FC'iL 3.1523 lOl.OO00 jR -~99.Z500 NRAT -999.2500 FCNL 1,89~6 ILD 9£.0625 SR -999,2500 NR.~T -999, Z500 FCNL 3.3008 iLD I0~.2500 -!999.2500 NRAT -9'99.Z$00 FCN.L .3.~453 ILO 93.~375 GR -999.2500 NRAT -999.2500 =CNL ,~ ,, $ Z 03 8,5.3125 ~SR 0.0171 NR.~T 1909.0000 3.2637 ZLD 79.~000 GR 0.0151 NRAT 1:835.0000 F'C~L 7'7.2500 ~R 0.2i27 NR~T 2210.0000 FCNL ,z.)gzz ILO i~l.Z.OOOO FC~'L 3,ZOIZ -999,2500 -999,2500 3.Z71~ -999.Z500 2,1328 -99g,ZSO0 -999,2500 -999,2500 3. S'730 - 999 o 250 O '- 99'}. 2500 -999.2500 .-J99,ZSO0 -9'99,2500 -999,250O 3.3301 8,3. 4375 ~,,. L1156 i. Z 500 86.3125 3.~082 505.7500 3,7891 79.5000 ~23,~000 77,2.500 3,515 6 5~:1,5000 3.9052 529.2500 I'L M CA~.I RNRA CALi RNRA RNRA IL M CAL. I RNRA iLM RNRA ,IL M CALI RNA A iLM CAcI RNRA iL M RNRA i L M ~NR~ ZLM C A L I RNRA 2.8223 -999,2500 -999.2500 3.2158 -993,2500 -999,C5~0 -999,2500 -993,2500 3.~i02 -999.2500 -~9'9.og500 3.2Z66 3.9 3 9,5 ,3'828i !1.i641 3.773~ 10,2969 4°3320 5.5328 10.0313 ~.07.81 LV~ 0.10.oNO'Z '¥~Ri~CATi!3N LISTING SE~V ICE NAME ATE : FI~-E TYPE : N~.~T FiLE ** TAPE 'TRAI~-E~ ~- SERVICE NAME :EDIT DATE :55/05/ 1 gRIGIN TAPE NAME :0~22 CONTiNJATIDN ~ :01 NEXT TAPE NAME COMMENTS : · , RE2L TRAiL~R SE~V,iCE NAME ;DARE :85/05/ gRIG,IN : RE,~L NAME CONTiN'jA'TI 2N ~ NEXT R~EL NAME C,D MM~EN TS :