HomeMy WebLinkAbout203-0851. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: OA Cement
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service
6. API Number:
7. If perforating:8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Yes No
9. Property Designation (Lease Number): 10. Field:
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
16389'None
Casing Collapse
Structural
Conductor
Surface
Intermediate
Production
Open Hole
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
8/1/2025
16389'4260'
3-1/2"
7237'
Packer: Baker SAB-3 Packer
SSSV: Camco TRM-4E SCSSSV- locked out
Perforation Depth MD (ft):
L-80
3019'
11555-11575', 11600-11625',
11650-11675'
12094'
6-1/8"
7064-7076', 7087-7098', 7109-
7120'
7"
Perforation Depth TVD (ft):
114'
3055'
7229'12129'
16"
9-5/8"
77'
11514' MD
MD
114'
2389'
ConocoPhillips Alaska, Inc.
Length Size
Proposed Pools:
PRESENT WELL CONDITION SUMMARY
Alpine Oil Pool
TVD Burst
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL0380075
203-085
P.O. Box 100360, Anchorage, AK 99510 50-103-20457-00-00
Colville River Field Alpine Oil Pool
AOGCC USE ONLY
Tubing Grade: Tubing MD (ft):
11417' MD and 6997' TVD
2305' MD and 1955' TVD
Mark Shulman
Subsequent Form Required:
Suspension Expiration Date:
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi): Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
Mark.Shulman@conocophillips.com
(907) 263-3782
Senior Well Interventions Engineer
CRU CD2-58
7191' 11484' 7032' 11484'
N/A
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
By Grace Christianson at 8:10 am, Jul 17, 2025
Mark Shulman Digitally signed by Mark Shulman
Date: 2025.07.16 16:18:43 -08'00'
325-423
SFD 7/22/2025
7237' * SFD
X
DSR-7/18/25
10-404
VTL 7/28/2025
* Per Sperry Sun Survey Report dated 28 April 2004 (min. curvature) SFD
*&:
Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2025.07.28 15:59:19 -08'00'
07/28/25
RBDMS JSB 073125
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
July 16, 2025
Commissioner Jessie Chmielowski
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
Dear Commissioner Chmielowski,
Please find enclosed the 10-403 Application for Sundry Approval for ConocoPhillips
Alaska, Inc. CRU CD2-58 (PTD 203-085) for OA cementing. The goal of the cementing
is to mitigate the pressure source and potentially repair the surface casing leak.
Please contact me at (907) 263-3782 if you have any questions.
Sincerely,
Mark Shulman
WNS Well Integrity Engineer
ConocoPhillips Alaska Inc.
Mark.Shulman@conocophillips.com
Mark
Shulman
Digitally signed by
Mark Shulman
Date: 2025.07.16
16:22:14 -08'00'
CD2-469 Cement Shoe Page 1
Date: July 16, 2025
Subject: CD2-58 OA Cement Shoe Procedure:
Network #:
Prepared By: Mark Shulman, 263-3782
Objective
Down squeeze 9-5/8”x 7” OA to cement surface casing shoe to surface.
Cement Volume Calculations:
x Volume in 9-5/8”x 7” annulus: (3,056 ft; 2,390’ TVD) x (0.0297bbl/ft) = 88 bbl
x Total volume: 153 bbls mixed (11 and 15.8 ppg) + 100 bbls (dry 15.7 ppg) = 253 bbl
Backup KWF: 12.5 ppg: 100 bbls (OA with KWF is static head of 1,550 psi)
CRU CD2-58 (PTD# 203-085) is a producer that was originally drilled and completed in 2003.
The well is currently shut-in for a surface casing leak and rock production.
CD2-58 needs a surface casing repair. CD2-58’s OA maintains a pressure of +400 psi. Surface
casing LOT was 16 ppg when drilled in 11/2008. The goal of the OA cementing is to control the
OA pressure by pumping an OA cement shoe to surface.
Procedure
1. Verify 10-403 Sundry form has been approved for OA cement job.
2. Contact Cement Pumping Services to schedule the OA cement job and allow time for
pilot testing.
3. Conduct Safety Meeting and Identify Hazards. Inspect wellhead and pad condition to
identify any pre-existing conditions.
4. Install 1502 union and valves on the OA. Rig up hardline to the OA with an option to
divert to open top tank for wash up. (see setup picture #1 below)
5. Ensure Valve crew services OA valves and any additional hardline valves installed for
cementing job.
6. Install containment into cellar to contain any returns from surface casing leak. Ensure
vac truck on location with cement containment to take returns from surface casing leak
from pumping operations.
7. MIRU cement pumping equipment and rig up 2” hardline to the circulation skid. Stage
equipment to minimize pumping stop time between stages.
8. Be sure to monitor around wellhead, wellhouse, and conductor top during OA pumping.
There is a known surface casing leaks near the surface. During the OA injectivity testing
returns were observed at the conductor.
CD2-469 Cement Shoe Page 2
9. PT lines and surface equipment to 3,000 psi.
10. Pumping the OA shoe recommendations:
a. Complete an Injectivity test up to 1500 psi. and ensure that OA will take
injection.
i. Lead with methanol and swap to diesel for injection test.
b. At the beginning of the job, increase the pump pressure as necessary to break
over on injection.
i. Do not exceed 1,000 psi.
c. Once the OA breaks over pump at maximum possible rate without exceeding
maximum pressure of 1,000 psi.
d. When cement gets to the shoe (88 bbls pump total after starting on cement),
slow pumps to a maximum of 1 BPM or 500 psi.
e. With 25 bbls of cement past the shoe (113 bbls after starting cement), shut-
down pumps and watch pressure.
f. Perform a 15-minute hesitation, then attempt to slowly squeeze another 10 bbls
at minimum rate.
g. Continue 15-minute hesitation steps with 10 bbls at minimum rates until well
locks-up.
i. If OA does not catch pressure after 123 bbls are pumped in OA, stop
pumping cement and swap to pump 100 bbls of 12.5 ppg KWF in OA to FP
and keep the shoe open and contact Wells Supervisor, production
engineer and WI engineer.
h. Use cement composition (11 # and 15.7 #) on page #4-5.
11. Pump Schedule:
a. Complete injectivity test with methanol and swap to diesel.
b. 10 bbls hot diesel per Wells Supv.
c. 65 bbls 90oF hot freshwater for flush of the OA.
d. 20 bbls CW100 surfactant wash.
e. 10 bbls freshwater spacer.
f. 15 bbls 15.8# Class G cement (neat).
g. 98 bbls 11# Class G cement with 2 lbs/bbl of CemNet/Artic slurry gas blocker.
i. Perform 15-minute hesitation.
h. 10 bbls of 15.8# Class G cement with 2 lbs/bbl of CemNet/Artic slurry gas
blocker.
i. Repeat 15-minute hesitation step
i. 10 bbls of 15.8# Class G cement with 2 lbs/bbl of CemNet/Artic slurry gas
blocker.
i. Repeat 15-minute hesitation step
j. 10 bbls of 15.8# Class G cement with 2 lbs/bbl of CemNet and gas blocker.
i. Repeat 15-minute hesitation step
k. If well locks up while pumping cement, go to next step.
CD2-469 Cement Shoe Page 3
12. Close annulus, open the cement clean up line, and circulate to tanks to wash up tree and
surface equipment. Top off OA with diesel for freeze protection.
13. Do not bleed the OA. Monitor the conductor top and downspout and vac out fluids if
needed.
14. Wash up cementing equipment, RDMO.
15. Send OA cement shoe field blend UCA results to mark.shulman@conocophillips.com
16. After the cement cures for 72 hours, perform OA drawdown test.
17. If DDT passes DHD to drop string line and verify top of cement.
18. Report well work to AOGCC on 10-404 form.
Volume (bbl):Fluid: Details:
Step 1 Methanol and diesel Complete injectivity test with methanol and swap to diesel.
Step 2 10 Hot diesel 10 bbls hot diesel per Wells Supv.
Step 3 65 Hot Fresh water 65 bbls 90F hot freshwater for flush of the OA.
Step 4 20 CW100 Surfactant 20 bbls CW100 surfactant wash.
Step 5 10 Freshwater 10 bbls freshwater spacer.
Step 6 15 15.8# Cement (neat) 15 bbls 15.8# Class G cement (neat).
Step 7 98 11# Cement gas blocker/CemNet 98 bbls 11# Class G cement with 2 lbs/bbl of CemNet/Artic slurry gas blocker.
Step 8 Perform 15-minute hesitation.
Step 9 10 11# Cement gas blocker/CemNet 10 bbls of 11# Class G cement with 2 lbs/bbl of CemNet/Artic slurry gas blocker.
Step 10 Repeat 15-minute hesitation step (swap to 15.8 # Cement w/CemNet/Gas blocker)
Step 11 10 15.8# Cement gas blocker/CemNet 10 bbls of 15.8# Class G cement with 2 lbs/bbl of CemNet/Artic slurry gas blocker.
Step 12 Repeat 15-minute hesitation step
Step 13 10 15.8# Cement gas blocker/CemNet 10 bbls of 15.8# Class G cement with 2 lbs/bbl of CemNet and gas blocker.
Step 14 Repeat 15-minute hesitation step
Step 15 10 15.8# Cement gas blocker/CemNet 10 bbls of 15.8# Class G cement with 2 lbs/bbl of CemNet and gas blocker.
Step 16 Repeat 15-minute hesitation step
Pump Schedule:
CD2-469 Cement Shoe Page 4
Equipment Setup Picture#1:
Cement Composition: ()
July 16, 20256
Needed on locaƟon:
LRS:
•Pump truck w/25 bbls diesel
NES:
•Transport w/cement mix water
•must be clean with funcƟonal paddles
•With XX bbls of 90-degree freshwater mixed with chemicals
from SLB bulk plant.
•Transport with 75 bbls of PowerVis to be located at K-pad Mud
plant.
Alpine Well Support:
•Dirty vac truck to suck out cellar during job
•Transport with 100 bbls KWF to be loaded at K-pad Mud plant.
•Transport with 290 bbls 90-degree freshwater to be loaded at K-
pad Mud Plant
SLB:
•CemenƟng crew, cement and associated equipment.
CD2-469 Cement Shoe Page 5
Last Tag
Annotation Depth (ftKB) Wellbore End Date Last Mod By
Last Tag: CTMD 12,101.0 CD2-58 9/2/2023 oberr
Last Rev Reason
Annotation Wellbore End Date Last Mod By
Rev Reason: Set RBP CD2-58 8/18/2024 boehmbh
Notes: General & Safety
Annotation End Date Last Mod By
NOTE: (SC REPAIR) SC has a 20' patch covering hole @ ~65" 3/9/2024 bsgreen
Casing Strings
Csg Des OD (in) ID (in) Top (ftKB)
Set Depth
(ftKB)
Set Depth
(TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread
CONDUCTOR
Insulated 40"
16 15.06 37.0 114.0 114.0 62.50 H-40 WELDED
SURFACE 9 5/8 8.92 36.6 3,055.3 2,389.1 36.00 J-55 BTC
PRODUCTION 7 6.28 34.6 12,128.9 7,228.7 26.00 L-80 BTCM
OPEN HOLE 6 1/8 12,129.0 16,389.0 7,237.0
Window L1 6 1/8 12,200.0 12,210.0 7,231.3
Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string
Top (ftKB)
32.8
Set Depth …
11,514.3
Set Depth …
7,047.1
String Max No…
3 1/2
Tubing Description
TUBING
Wt (lb/ft)
9.30
Grade
L-80
Top Connection
EUE MOD
ID (in)
2.99
Completion Details: excludes tubing, pup, space out, thread, RKB...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal
ID (in)
32.8 32.8 0.12 HANGER 10.800 FMC TUBING HANGER 4.500
121.5 121.5 0.46 XO-Reducing 4.500 XO 4.5x3.5" TUBING 3.500
2,305.4 1,954.6 53.90 SAFETY VLV 5.176 CAMCO TRM-4E SCSSSV -
LOCKED OUT 4/8/2012
2.813
5,015.0 3,419.5 58.09 GAS LIFT 5.390 CAMCO KBUG 2.920
9,154.9 5,748.0 56.05 GAS LIFT 5.390 CAMCO KBUG 2.920
11,242.7 6,903.0 57.49 GAS LIFT 5.390 CAMCO KBUG 2.920
11,331.4 6,950.9 57.15 SLEEVE-C 5.390 BAKER CMPA SLIDING SLEEVE
(CMD) w/2.81'X' PROFILE
**CLOSED 7/5/2003**
BAKER CMD 2.813
11,417.5 6,997.4 57.91 PACKER 5.970 BAKER SAB-3 PACKER
w/MILLOUT EXTENSION
3.875
11,503.0 7,041.5 60.39 NIPPLE 3.750 HES 2.81" ID 'XN' NIPPLE w/2.75"
NO GO
2.750
11,513.8 7,046.8 60.83 WLEG 5.000 WIRELINE ENTRY GUIDE 3.875
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ftKB)
Top (TVD)
(ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in)
11,484.0 7,032.0 59.64 RBP 3-1/2" PIIP Packer w/ EQ Sub
(ALPP35021/ ALEQ35004)
8/18/2024 0.000
11,503.0 7,041.5 60.39 SCREEN 2.813" XN-LOCK w/ ROCK
SCREEN (OAL=61.5")
HAL XN Lock
w/
Slotted
Rock
Screen
9/4/2023 0.000
Mandrel Inserts : excludes pulled inserts
Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°)
St
ati
on
No
/S Serv
Valve
Type
Latch
Type
OD
(in)
TRO Run
(psi) Run Date Com Make Model
Port
Size (in)
5,015.0 3,419.5 58.09 1 GAS LIFT GLV BK 1 1,842.0 2/11/2021 0.188
9,154.9 5,748.0 56.05 2 GAS LIFT GLV BK 1 1,776.0 2/11/2021 0.188
11,242.7 6,903.0 57.49 3 GAS LIFT DMY BK 1 0.0 8/11/2024 0.000
Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal ID
(in)
12,129.0 7,228.7 86.19 OPEN HOLE 6.125
Perforations & Slots
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Linked Zone Date
Shot
Dens
(shots/ft)Type Com
11,550.0 11,575.0 7,064.1 7,075.5 8/3/2019 5.0 APERF Fill Bypass perforations
11,600.0 11,625.0 7,086.9 7,098.1 8/2/2019 5.0 APERF Fill Bypass perforations
11,650.0 11,675.0 7,109.3 7,120.2 7/28/2019 5.0 APERF Fill Bypass perforations
Stimulation Intervals
Top (ftKB) Btm (ftKB)
Inter
val
Num
ber Type Subtype Start Date
Proppant
Designed (lb)
Proppant
Total (lb)
Vol Clean
Total (bbl)
Vol Slurry
Total (bbl)
12,129.0 16,389.0 1 FRAC 3/11/2006 0.0 0.00 0.00
CD2-58, 7/16/2025 3:26:38 PM
Vertical schematic (actual)
OPEN HOLE; 12,129.0-16,389.0
FRAC; 12,129.0
Window L1; 12,200.0-12,210.0
PRODUCTION; 34.6-12,128.9
APERF; 11,650.0-11,675.0
APERF; 11,600.0-11,625.0
APERF; 11,550.0-11,575.0
SCREEN; 11,503.0
NIPPLE; 11,503.0
RBP; 11,484.0
PACKER; 11,417.5
SLEEVE-C; 11,331.4
GAS LIFT; 11,242.7
GAS LIFT; 9,154.9
GAS LIFT; 5,015.0
SURFACE; 36.6-3,055.3
SAFETY VLV; 2,305.4
CONDUCTOR Insulated 40";
37.0-114.0
WNS PROD
KB-Grd (ft)
43.99
RR Date
6/9/2003
Other Elev…
CD2-58
...
TD
Act Btm (ftKB)
16,389.0
Well Attributes
Field Name
ALPINE
Wellbore API/UWI
501032045700
Wellbore Status
PROD
Max Angle & MD
Incl (°)
97.14
MD (ftKB)
16,347.01
WELLNAME WELLBORECD2-58
Annotation
Last WO:
End DateH2S (ppm) DateComment
SSSV: LOCKED OUT
Last Rev Reason
Annotation Wellbore End Date Last Mod By
Rev Reason: Set Iso Sleeve CD2-58L1 1/20/2020 boehmbh
Notes: General & Safety
Annotation End Date Last Mod By
NOTE: VIEW SCHEMATIC w/Alaska Schematic9.0 12/3/2009 lmosbor
NOTE: TREE: FMC 4 1/16 5K - TREE CAP CONNECTION: 7" OTIS 6/5/2005 WV5.3
Conversio
n
Casing Strings
Csg Des OD (in) ID (in) Top (ftKB)
Set Depth
(ftKB)
Set Depth
(TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread
L1 OPEN HOLE 6 1/8 6.13 12,200.0 13,550.0 7,299.9
Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal ID
(in)
12,200.0 7,231.3 90.19 OPEN HOLE L1 6.125 6.125
CD2-58L1, 7/16/2025 3:26:39 PM
Vertical schematic (actual)
L1 OPEN HOLE; 12,200.0-
13,550.0
OPEN HOLE; 12,129.0-16,389.0
FRAC; 12,129.0
PRODUCTION; 34.6-12,128.9
APERF; 11,650.0-11,675.0
APERF; 11,600.0-11,625.0
APERF; 11,550.0-11,575.0
SCREEN; 11,503.0
NIPPLE; 11,503.0
RBP; 11,484.0
PACKER; 11,417.5
SLEEVE-C; 11,331.4
GAS LIFT; 11,242.7
GAS LIFT; 9,154.9
GAS LIFT; 5,015.0
SURFACE; 36.6-3,055.3
SAFETY VLV; 2,305.4
CONDUCTOR Insulated 40";
37.0-114.0
WNS PROD
KB-Grd (ft)
43.99
RR Date
6/9/2003
Other Elev…
CD2-58L1
...
TD
Act Btm (ftKB)
13,550.0
Well Attributes
Field Name
ALPINE
Wellbore API/UWI
501032045760
Wellbore Status
PROD
Max Angle & MD
Incl (°)
90.19
MD (ftKB)
12,200.00
WELLNAME WELLBORECD2-58
Annotation
Last WO:
End DateH2S (ppm) DateComment
SSSV: WRDP
Originated: Delivered to:12-Sep-24
Alaska Oil & Gas Conservation Commiss 12Sep24-NR
ATTN: MeredithGuhl
333 W. 7th Ave., Suite 100
600 E 57th Place Anchorage, Alaska 99501-3539
Anchorage, AK 99518
(907) 273-1700 main (907)273-4760 fax
WELL NAME API #
SERVICE ORDER
# FIELD NAME
SERVICE
DESCRIPTION
DELIVERABLE
DESCRIPTION DATA TYPE DATE LOGGED
CD2-58 50-103-20457-00-00 203-085 Colville River WL SBHPS-RBP FINAL FIELD 16-Aug-24
CD2-21 50-103-20504-00-00 204-245 Colville River WL Patch FINAL FIELD 18-Aug-24
CD2-467 50-103-20579-00-00 208-114 Colville River WL Patch FINAL FIELD 20-Aug-24
1B-07 50-029-20616-00-00 181-089 Kuparuk River WL MechCutter FINAL FIELD 24-Aug-24
2A-11 50-103-20057-00-00 186-003 Kuparuk River WL Isealate Patch FINAL FIELD 27-Aug-24
3F-11 50-029-21482-00-00 185-272 Kuparuk River WL IPROF FINAL FIELD 29-Aug-24
2A-20 50-103-20196-00-00 193-151 Kuparuk River WL IPROF FINAL FIELD 30-Aug-24
3F-20 50-029-22947-00-00 199-079 Kuparuk River WL IPROF FINAL FIELD 2-Sep-24
3J-18 50-029-22701-00-00 196-147 Kuparuk River WL Lee-PPROF FINAL FIELD 3-Sep-24
2U-12 50-029-21304-00-00 185-041 Kuparuk River WL PPROF FINAL FIELD 4-Sep-24
1D-39 50-029-22997-00-00 200-216 Kuparuk River WL Punch-Cut FINAL FIELD 9-Sep-24
2P-448A 50-103-20396-01-00 202-005 Kuparuk River WL Punch FINAL FIELD 10-Sep-24
2P-432 50-103-20420-00-00 202-091 Kuparuk River WL Punch FINAL FIELD 11-Sep-24
2P-434 50-103-20467-00-00 203-153 Kuparuk River WL Punch FINAL FIELD 11-Sep-24
Transmittal Receipt
________________________________ X_________________________________
Print Name Signature Date
Please return via courier or sign/scan and email a copy to Schlumberger.
Nraasch@slb.com SLB Auditor -
TRANSMITTAL DATE
TRANSMITTAL #
A Delivery Receipt signature confirms that a package (box, envelope,
etc.) has been received. The package will be handled/delivered per
standard company reception procedures. The package's contents have
not been verified but should be assumed to contain the above noted
media.
# Schlumberger-Private
T39555
T39556
T39557
T39558
T39559
T39560
T39561
T39562
T39564
T39565
T39566
T39567
T39668
T39563
Gavin Gluyas
Digitally signed by Gavin
Gluyas
Date: 2024.09.13 08:31:59
-08'00'
CD2-58 50-103-20457-00-00 203-085 Colville River WL SBHPS-RBP FINAL FIELD 16-Aug-24 T39555
1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program
Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Sc Repair
Cononophillips Alaska inc. Development Exploratory
Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number):8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured 16,389' feet N/A feet
true vertical 7,191' feet N/A feet
Effective Depth measured feet 11,418' feet
true vertical feet 6,997' feet
Perforation depth Measured depth 11,550'-11,675'feet
True Vertical depth 7,064'-7,120'feet
Tubing (size, grade, measured and true vertical depth)3 1/2 L-80 11,514' MD 7,047' TVD
Packers and SSSV (type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.
Prior to well operation:
Subsequent to operation:
13b. Pools active after work:
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Authorized Name and
Digital Signature with Date:Contact Name:Brennan Green/Roger Mouser
Contact Email:N1927@COP.COM
Authorized Title:Well Integrity field supervisor Contact Phone:
907-659-7506
323-601
Sr Pet Eng:Sr Pet Geo:Sr Res Eng:
WINJ WAG
N/A
Water-BblOil-Bbl
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
BAKER SAB-3 W/ MILLOUT EXTENSION, 11,418' MD, 6,997' TVD
N/A
measured
true vertical
Packer
Representative Daily Average Production or Injection Data
Casing Pressure Tubing Pressure
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
N/A
Gas-Mcf
MD
N/A
N/A
Size
114'
N/A N/AN/A
N/A N/AN/A
N/A
measured
TVD
7"
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
203-085
50-103-20457-00-00
Po box 100360, anchorage Alaska 99510-03603. Address:
N/A
5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work:
ADL0380075
COLVILLE RIVER, ALPINE OIL
COLVILLE RIV UNIT CD2-58
Plugs
Junk measured
Length
Production
Open Hole
12,094'
4,260'
Casing
7,229'
6 1/8"
12,129'
16,389'7,237'
114'Conductor
Surface
16"
9 5/8"
77'
3,018'3,055'2,389'
Burst Collapse
p
k
ft
t
Fra
O
s
203
6. A
G
L
PG
,
Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov
Digitally signed by Brennen Green
DN: C=US, O=ConocoPhillips, CN=Brennen Green, E
=n1927@conocophillips.com
Reason: I am the author of this document
Location:
Date: 2024.03.09 08:30:02-09'00'
Foxit PDF Editor Version: 13.0.0
Brennen Green
By Grace Christianson at 8:31 am, Mar 11, 2024
VTL 8/15/2024
RBDMS JSB 031424
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
March 9, 2024
Commissioner Jessie Chmielowski
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
Commissioner Chmielowski,
Please find the enclosed 10-404 from ConocoPhillips Alaska, Inc. for the Surface Casing repair
attempt on ALP CD2-58 (PTD 203-085).
Feel free to contact me or my alternate, Roger Mouser, at 659-7506 if you have any questions.
Sincerely,
Well Integrity Field Supervisor
N1927@conocophillips.com
ConocoPhillips Alaska, Inc.
Digitally signed by Brennen Green
DN: C=US, O=ConocoPhillips, CN=Brennen Green, E=n1927@conocophillips.com
Reason: I am the author of this document
Location:
Date: 2024.03.09 08:29:06-09'00'
Foxit PDF Editor Version: 13.0.0
Brennen Green
Date Event Summary
Executive
Summary
CD2-58 SC Repair -welded 20' sleeve to existing SC to repair SC leak @12'7"'. Second Leak located
greater than 36' , unable to excavate to that depth for repair.
03/06/24 (SC REPAIR) WELD CONDUCTOR (COMPLETE)
03/05/24 (SC REPAIR) SCLD FAILED LEAK BELOW REPAIRABLE DEPTH
03/04/24 (SC REPAIR) FINISH VERTICAL & TOP & BOTTOM CIRCUMFERERNTIAL WELDS , MISTRAS
INSPECTED WELDS OAL OF SC PATCH 240"
03/03/24 (SC REPAIR) RIG HEAT MACHINE DOWN , FIT & FINISHED WELDING A BAND & INSPECTED ,
PLACE SC PATCH SPANNING A & B BANDS , WELDING IN PROGRESS
03/02/24 (SC REPAIR) RIG HEAT MACHINE TO STARTER HEAD PRE HEAT , WELD A BAND
03/01/24 (SC REPAIR) RIG HEAT MACHINE TO STARTER HEAD , WELD B BAND IN PROGRESS
02/29/24
(SC REPAIR) IN PROGRESS VERIFIED OA FL @ 13' BELOW LEAK POINT. SC GAS READINGS
1.6% O2, 0% LELs, 0 PPM CO, 0 PPM H2S.
PRESSURE OA WITH 40 PSI NITROGEN, SHOT OA FL @ 48' (~28) BELOW LOWER MOST
WELD POINT. READY FOR WELDING.
02/28/24
(SC REPAIR) OA FL AT SURFACE, NEED TO EVACUATE OR DEPRESS OA FL TO 26' TO
PROCEED WITH ISWP CRITERIA FOR CD2-58.
WELDERS/FITTERS COMPLETED CLEANING OUT SHORE BOX POST STORM AND
EQUIPMENT COLD WEATHER.
BLED IA & OA TO ZERO.
02/27/24 (SC REPAIR) REPLACED STAIRS, WELDERS OBTAINED FIELD VERIFICATION FOR WELD
PACKAGE. BLED RESIDUAL PRESSURE ON IA & OA.
02/19/24 (SC REPAIR) IN PROGRESS -MISTRAS extended "B" band location per FME request.
02/17/24
(SC REPAIR) IN PROGRESS ASRC WELDERS REMOVED ADDITIONAL 3" of 16" CONDUCTOR.
MEASUREMENT FROM TOP OF FLUTE TO CONDUCTOR = 21` 2.375" OAL.
WAITING FOR COMPLETION OF ISWP AND RETURN FOR FABRICATION.
02/16/24 (SC REPAIR) MISTRAS RELOCATED "A" & "B" BANDS. (COMPLETE)
RE MT/ UT LOCATION FOR "A' BAND TO BE WELDED TO FLUTES, VERSUS 15" BELOW
FLUTES.
IN-SERVICE WELD PACKAGE SIGNED AND FORWARDED THRU BLUE BEAM PROGRAM.
02/15/24 (SC Repair) : Buff "A" & "B" bands (Complete), Mistras UT/MT (Complete).
02/14/24 (SC REPAIR) SCLD (IN PROGRESS)
02/13/24 (SC REPAIR) SCLD (IN PROGRESS)
02/12/24 (SC REPAIR) SCLD (IN PROGRESS)
02/11/24 (SC REPAIR) SCLD (IN PROGRESS)
02/10/24
(SC REPAIR) SCAFFOLDING AND HOOCH (COMPLETE) T DDT (PASS) IA DDT (PASS) OA DDT
(PASS) CUT AND REMOVED 15' 9" OF INSULATED CONDUCTOR AND INSULATION
(COMPLETE)
02/09/24 (SC REPAIR) SCAFFOLDING & HOOCH (IN PROGRESS)
02/08/24 (SC REPAIR) EXCAVATION (COMPLETE) SET SHORING BOX & STAIRS (COMPLETE - NIGHT
SHIFT) SCAFFOLDING / HOOCH (IN PROGRESS)
12/23/23 (SC REPAIR) CUT INSPECTION WINDOWS INTO THE CONDUCTOR (COMPLETE) MISTRAS UT
THE SC INSIDE OF THE WINDOWS (COMPLETE)
12/22/23 (SC REPAIR) OA DDT (PASSED)
12/12/23 (SC REPAIR) T X IA CDDT (PASS) OA DDT (PASS) SBMS PASSED ,T POT PASSED, UPPER AND
LOWER MTM POT PASSED , IC POT PASSED
10/25/23 (AC EVAL) : SCLD, Leak @ 12' 7" (Complete).
Last Tag
Annotation Depth (ftKB) Wellbore End Date Last Mod By
Last Tag: CTMD 12,101.0 CD2-58 9/2/2023 oberr
Last Rev Reason
Annotation Wellbore End Date Last Mod By
Rev Reason: SC Repair CD2-58 3/9/2024 bsgreen
Notes: General & Safety
Annotation End Date Last Mod By
NOTE: (SC REPAIR) SC has a 20' patch covering hole @ ~65" 3/9/2024 bsgreen
Casing Strings
Csg Des OD (in) ID (in) Top (ftKB)
Set Depth
(ftKB)
Set Depth
(TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread
CONDUCTOR
Insulated 40"
16 15.06 37.0 114.0 114.0 62.50 H-40 WELDED
SURFACE 9 5/8 8.92 36.6 3,055.3 2,389.1 36.00 J-55 BTC
PRODUCTION 7 6.28 34.6 12,128.9 7,228.7 26.00 L-80 BTCM
OPEN HOLE 6 1/8 12,129.0 16,389.0 7,237.0
Window L1 6 1/8 12,200.0 12,210.0 7,231.3
Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string
Top (ftKB)
32.8
Set Depth …
11,514.3
Set Depth …
7,047.1
String Max No…
3 1/2
Tubing Description
TUBING
Wt (lb/ft)
9.30
Grade
L-80
Top Connection
EUE MOD
ID (in)
2.99
Completion Details: excludes tubing, pup, space out, thread, RKB...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal
ID (in)
32.8 32.8 0.12 HANGER 10.800 FMC TUBING HANGER 4.500
121.5 121.5 0.46 XO-Reducing 4.500 XO 4.5x3.5" TUBING 3.500
2,305.4 1,954.6 53.90 SAFETY VLV 5.176 CAMCO TRM-4E SCSSSV -
LOCKED OUT 4/8/2012
2.813
5,015.0 3,419.5 58.09 GAS LIFT 5.390 CAMCO KBUG 2.920
9,154.9 5,748.0 56.05 GAS LIFT 5.390 CAMCO KBUG 2.920
11,242.7 6,903.0 57.49 GAS LIFT 5.390 CAMCO KBUG 2.920
11,331.4 6,950.9 57.15 SLEEVE-C 5.390 BAKER CMPA SLIDING SLEEVE
(CMD) w/2.81'X' PROFILE
**CLOSED 7/5/2003**
BAKER CMD 2.813
11,417.5 6,997.4 57.91 PACKER 5.970 BAKER SAB-3 PACKER
w/MILLOUT EXTENSION
3.875
11,503.0 7,041.5 60.39 NIPPLE 3.750 HES 2.81" ID 'XN' NIPPLE w/2.75"
NO GO
2.750
11,513.8 7,046.8 60.83 WLEG 5.000 WIRELINE ENTRY GUIDE 3.875
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ftKB)
Top (TVD)
(ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in)
11,482.0 7,031.0 59.56 CATCHER 2.78" AVA CATCHER 11/7/2023 0.000
11,486.0 7,033.0 59.72 RBP 3-1/2" PIIP Packer w/ EQ Sub
(ALPP35018/ ALEQ35003)
11/7/2023 0.000
11,503.0 7,041.5 60.39 SCREEN 2.813" XN-LOCK w/ ROCK
SCREEN (OAL=61.5")
HAL XN Lock
w/
Slotted
Rock
Screen
9/4/2023 0.000
Mandrel Inserts : excludes pulled inserts
Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°)
St
ati
on
No
/S Serv
Valve
Type
Latch
Type
OD
(in)
TRO Run
(psi) Run Date Com Make Model
Port
Size (in)
5,015.0 3,419.5 58.09 1 GAS LIFT GLV BK 1 1,842.0 2/11/2021 0.188
9,154.9 5,748.0 56.05 2 GAS LIFT GLV BK 1 1,776.0 2/11/2021 0.188
11,242.7 6,903.0 57.49 3 GAS LIFT OPEN 11/7/2023
Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal ID
(in)
12,129.0 7,228.7 86.19 OPEN HOLE 6.125
Perforations & Slots
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Linked Zone Date
Shot
Dens
(shots/ft)Type Com
11,550.0 11,575.0 7,064.1 7,075.5 8/3/2019 5.0 APERF Fill Bypass perforations
11,600.0 11,625.0 7,086.9 7,098.1 8/2/2019 5.0 APERF Fill Bypass perforations
11,650.0 11,675.0 7,109.3 7,120.2 7/28/2019 5.0 APERF Fill Bypass perforations
Stimulation Intervals
Top (ftKB) Btm (ftKB)
Inter
val
Num
ber Type Subtype Start Date
Proppant
Designed (lb)
Proppant
Total (lb)
Vol Clean
Total (bbl)
Vol Slurry
Total (bbl)
12,129.0 16,389.0 1 FRAC 3/11/2006 0.0 0.00 0.00
CD2-58, 3/9/2024 8:14:57 AM
Vertical schematic (actual)
OPEN HOLE; 12,129.0-16,389.0
OPEN HOLE; 12,129.0-16,389.0
FRAC; 12,129.0
Window L1; 12,200.0-12,210.0
L1 WINDOW; 12,200.0-12,210.0
PRODUCTION; 34.6-12,128.9
FLOAT SHOE; 12,127.5-
12,128.9
FLOAT COLLAR; 12,043.8-
12,045.1
APERF; 11,650.0-11,675.0
APERF; 11,600.0-11,625.0
APERF; 11,550.0-11,575.0
WLEG; 11,513.8
SCREEN; 11,503.0
NIPPLE; 11,503.0
RBP; 11,486.0
CATCHER; 11,482.0
PACKER; 11,417.5
SLEEVE-C; 11,331.4
GAS LIFT; 11,242.7
GAS LIFT; 9,154.9
GAS LIFT; 5,015.0
SURFACE; 36.6-3,055.3
FLOAT SHOE; 3,053.1-3,055.3
FLOAT COLLAR; 2,964.5-
2,966.0
SAFETY VLV; 2,305.4
CONDUCTOR Insulated 40";
37.0-114.0
SURFACE CSG HANGER; 36.6-
38.8
PROD HANGER; 34.6-35.9
HANGER; 32.8
WNS PROD
KB-Grd (ft)
43.99
RR Date
6/9/2003
Other Elev…
CD2-58
...
TD
Act Btm (ftKB)
16,389.0
Well Attributes
Field Name
ALPINE
Wellbore API/UWI
501032045700
Wellbore Status
PROD
Max Angle & MD
Incl (°)
97.14
MD (ftKB)
16,347.01
WELLNAME WELLBORECD2-58
Annotation
Last WO:
End DateH2S (ppm) DateComment
SSSV: LOCKED OUT
1. Type of Request:Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing
2. Operator Name:4. Current Well Class: 5. Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service
6. API Number:
7. If perforating:8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?N/A
Yes No
9. Property Designation (Lease Number):10. Field:
11.
Total Depth MD (ft):Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
16,389'N/A
Casing Collapse
Conductor
Surface
Production
Open Hole
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
12. Attachments:Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations:OIL WINJ WDSPL Suspended
16. Verbal Approval:Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
SSSV: 2,305' MD / 1,955' TVD
Packer: 11,418' MD / 6,997' TVD
SSSV: CAMCO TRM-4E (LOCKED OUT)
Brennen Green / Roger Mouser
N1927@conocophillips.com
907-659-7506
COLVILLE RIV UNIT CD2-58
COLVILLE RIVER ALPINE OIL N/A
7,191'N/A
Subsequent Form Required:
Suspension Expiration Date:
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi):Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
PRESENT WELL CONDITION SUMMARY
AOGCC USE ONLY
Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft):Perforation Depth MD (ft):
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL0380075
203-085
Po Box 100360, Anchorage Alaska 99510-0360 50-103-20457-00-00
Conocophillips Alaska Inc.
Other: SC Repair
Length Size
Proposed Pools:
L-80
TVD Burst
11,514'
MD
114'
2,389'
114'
3,055'
7,229'
Packer: BAKER SAB-3 w/MILLOUT EXTENSION
7"
16"
9 5/8"
77'
3,018'
12,129'
W.I. Field Supervisor
11,550' - 11,675'
12,094'
6 1/8"
7,064' - 7,120'
12/6/2023
16,389'4,260'
3 1/2'
7,237'
m
n
P
2
6
5
6
t
N
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
Digitally signed by Brennen Green
DN: C=US, O=ConocoPhillips, CN=Brennen Green, E=n1927
@conocophillips.com
Reason: I am the author of this document
Location:
Date: 2023.11.06 14:48:58-09'00'
Foxit PDF Editor Version: 12.1.2
Brennen Green
323-601
By Grace Christianson at 3:15 pm, Nov 06, 2023
DSR-11/8/23
Photo document repair
10-404
SFD 11/16/2023VTL 11/16/2023*&:JLC 11/17/2023
Brett W. Huber,
Sr.
Digitally signed by Brett W. Huber,
Sr.
Date: 2023.11.17 13:15:17 -09'00'11/17/23
RBDMS JSB 112823
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
November 06, 2023
Commissioner Jessie Chmielowski
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
Dear Commissioner Chmielowski,
Please find enclosed the 10-403 Application for Sundry Approval for ConocoPhillips
Alaska, Inc. well, ALP CD2-58 (PTD 203-085), to repair the Surface Casing.
Please contact Brennen Green or Roger Mouser at 659-7506 if you have any questions.
Sincerely,
Well Integrity Field Supervisor
ConocoPhillips Alaska, Inc.
Digitally signed by Brennen Green
DN: C=US, O=ConocoPhillips, CN=Brennen Green, E=
n1927@conocophillips.com
Reason: I am the author of this document
Location:
Date: 2023.11.06 14:49:22-09'00'
Foxit PDF Editor Version: 12.1.2
Brennen Green
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
ConocoPhillips Alaska, Inc.
ALPINE WELL CD2-58 (PTD 203-085)
SUNDRY NOTICE 10-403 APPROVAL REQUEST
November 6, 2023
This application for Sundry approval for Alpine well CD2-58 is for the inspection and repair of
surface casing with a suspected surface casing leak. Subsequent diagnostics indicate that the leak
is relatively shallow. ConocoPhillips requests approval to inspect and repair the surface casing.
With approval, inspection and repair of the surface casing will require the following general
steps:
1. Secure the well as needed with mechanical plug in the tubing.
2. Remove the floor grate, well house, flow lines, and other equipment as necessary from
around the wellhead.
3. Remove gravel around well head and excavate well.
4. Install nitrogen purge equipment for the conductor and OA (if needed) so that hot work may
be conducted in a safe manner.
5. Cut windows in the conductor casing and remove cement from the outside of the surface
casing for inspection. Remove additional conductor as necessary. Notify AOGCC Inspector
for opportunity to inspect.
6. CPAI Mechanical Engineers will determine type of patch or repair needed to return the
casing to operational integrity.
7. QA/QC will verify the repair for a final integrity check.
8. Perform a pressure test to confirm no fluid to surface.
9. Install anti-corrosion coating as specified by CPAI Corrosion Engineer.
10. Replace the conductor and fill the void with cement and top off with sealant.
11. Backfill as needed with gravel around the wellhead.
12. Remove plug(s) and return the well to production.
13. File 10-404 with the AOGCC post repair.
Last Tag
Annotation Depth (ftKB) Wellbore End Date Last Mod By
Last Tag: CTMD 12,101.0 CD2-58 9/2/2023 oberr
Last Rev Reason
Annotation Wellbore End Date Last Mod By
Rev Reason: SBHP, Set Rock Screen, Set ISO Sleeve CD2-58 9/4/2023 oberr
Casing Strings
Csg Des OD (in) ID (in) Top (ftKB)
Set Depth
(ftKB)
Set Depth
(TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread
CONDUCTOR
Insulated 40"
16 15.06 37.0 114.0 114.0 62.50 H-40 WELDED
SURFACE 9 5/8 8.92 36.6 3,055.3 2,389.1 36.00 J-55 BTC
PRODUCTION 7 6.28 34.6 12,128.9 7,228.7 26.00 L-80 BTCM
OPEN HOLE 6 1/8 12,129.0 16,389.0 7,237.0
Window L1 6 1/8 12,200.0 12,210.0 7,231.3
Tubing Strings: string max indicates LONGEST segment of string
Top (ftKB)
32.8
Set Depth …
11,514.3
Set Depth …
7,047.1
String Ma…
3 1/2
Tubing Description
TUBING
Wt (lb/ft)
9.30
Grade
L-80
Top Connection
EUE MOD
ID (in)
2.99
Completion Details: excludes tubing, pup, space out, thread, RKB...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal
ID (in)
32.8 32.8 0.12 HANGER 10.800 FMC TUBING HANGER 4.500
121.5 121.5 0.46 XO-Reducing 4.500 XO 4.5x3.5" TUBING 3.500
2,305.4 1,954.6 53.90 SAFETY VLV 5.176 CAMCO TRM-4E SCSSSV -
LOCKED OUT 4/8/2012
2.813
5,015.0 3,419.5 58.09 GAS LIFT 5.390 CAMCO KBUG 2.920
9,154.9 5,748.0 56.05 GAS LIFT 5.390 CAMCO KBUG 2.920
11,242.7 6,903.0 57.49 GAS LIFT 5.390 CAMCO KBUG 2.920
11,331.4 6,950.9 57.15 SLEEVE-C 5.390 BAKER CMPA SLIDING SLEEVE
(CMD) w/2.81'X' PROFILE
**CLOSED 7/5/2003**
BAKER CMD 2.813
11,417.5 6,997.4 57.91 PACKER 5.970 BAKER SAB-3 PACKER
w/MILLOUT EXTENSION
3.875
11,503.0 7,041.5 60.39 NIPPLE 3.750 HES 2.81" ID 'XN' NIPPLE w/2.75"
NO GO
2.750
11,513.8 7,046.8 60.83 WLEG 5.000 WIRELINE ENTRY GUIDE 3.875
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ftKB)
Top (TVD)
(ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in)
2,304.5 1,954.1 53.90 ISO-SLEEVE 2.813" ISO Sleeve on 2.813" X
Lock (50" OAL)
HAL X Lock
w/ ISO
Sleeve
9/4/2023 1.750
11,503.0 7,041.5 60.39 SCREEN 2.813" XN-LOCK w/ ROCK
SCREEN (OAL=61.5")
HAL XN Lock
w/
Slotted
Rock
Screen
9/4/2023 0.000
Mandrel Inserts : excludes pulled inserts
Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°)
St
ati
on
No
/S Serv
Valve
Type
Latch
Type
OD
(in)
TRO Run
(psi) Run Date Com Make Model
Port
Size (in)
5,015.0 3,419.5 58.09 1 GAS LIFT GLV BK 1 1,842.0 2/11/2021 0.188
9,154.9 5,748.0 56.05 2 GAS LIFT GLV BK 1 1,776.0 2/11/2021 0.188
11,242.7 6,903.0 57.49 3 GAS LIFT OV BTM 1 11/25/2022 EXT
PKG
0.250
Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal ID
(in)
12,129.0 7,228.7 86.19 OPEN HOLE 6.125
Perforations & Slots
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Linked Zone Date
Shot
Dens
(shots/ft)Type Com
11,550.0 11,575.0 7,064.1 7,075.5 8/3/2019 5.0 APERF Fill Bypass perforations
11,600.0 11,625.0 7,086.9 7,098.1 8/2/2019 5.0 APERF Fill Bypass perforations
11,650.0 11,675.0 7,109.3 7,120.2 7/28/2019 5.0 APERF Fill Bypass perforations
Stimulation Intervals
Top (ftKB) Btm (ftKB)
Inter
val
Num
ber Type Subtype Start Date
Proppant
Designed (lb)
Proppant
Total (lb)
Vol Clean
Total (bbl)
Vol Slurry
Total (bbl)
12,129.0 16,389.0 1 FRAC 3/11/2006 0.0 0.00 0.00
CD2-58, 9/5/2023 5:21:46 AM
Vertical schematic (actual)
OPEN HOLE; 12,129.0-16,389.0
FRAC; 12,129.0
OPEN HOLE; 12,129.0-16,389.0
Window L1; 12,200.0-12,210.0
L1 WINDOW; 12,200.0-12,210.0
PRODUCTION; 34.6-12,128.9
FLOAT SHOE; 12,127.5-
12,128.9
FLOAT COLLAR; 12,043.8-
12,045.1
APERF; 11,650.0-11,675.0
APERF; 11,600.0-11,625.0
APERF; 11,550.0-11,575.0
WLEG; 11,513.8
SCREEN; 11,503.0
NIPPLE; 11,503.0
PACKER; 11,417.5
SLEEVE-C; 11,331.4
GAS LIFT; 11,242.7
GAS LIFT; 9,154.9
GAS LIFT; 5,015.0
SURFACE; 36.6-3,055.3
FLOAT SHOE; 3,053.1-3,055.3
FLOAT COLLAR; 2,964.5-
2,966.0
SAFETY VLV; 2,305.4
ISO-SLEEVE; 2,304.5
CONDUCTOR Insulated 40";
37.0-114.0
SURFACE CSG HANGER; 36.6-
38.8
PROD HANGER; 34.6-35.9
HANGER; 32.8
WNS PROD
KB-Grd (ft)
43.99
RR Date
6/9/2003
Other Elev…
CD2-58
...
TD
Act Btm (ftKB)
16,389.0
Well Attributes
Field Name
ALPINE
Wellbore API/UWI
501032045700
Wellbore Status
PROD
Max Angle & MD
Incl (°)
97.14
MD (ftKB)
16,347.01
WELLNAME WELLBORECD2-58
Annotation
Last WO:
End DateH2S (ppm) DateComment
SSSV: LOCKED OUT
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
)perations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑
Performed: Suspend ❑ Perforate [7] Other Stimulate ❑ Alter Casing ❑
Plug for Redrill ❑ erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑
)perator 4. Well Class Before Work: 5. Per
ne: ConocoPhillips Alaska, Inc.
Development Exploratory ❑
ddress: P. O. Box 100360, Anchors e, Alaska Stratigmphi
99510 g Service E]6. API
[r'7
- =.Operations shutdown ❑
Change Approved Program ❑
Other: ❑
Number:
203-085
8. Well Name and Number:
ADL 3RDD7.r. CRIT Cr)? -FR
9. Logs (List logs and submit electronic and printed data 20AAC25.071)
per
10.: ieldM: ol(s):
N/A
Colville River Field / Alpine Oil Pool
11. Present Well Conddion Summary:
Total Depth measured 16,389
feet Plugs
measured None feet
true vertical 7,237
feet Junk
measured None feet
Effective Depth measured 16,389
feet Packer
measured 11,418 feet
true vertical 7,237
feet
true vertical 6,997 feet
Casing Length Size
MD
TVD Burst Collapse
INSULATED 40" 77 feet 16
114' MD
114' TVD
SURFACE 3,019 feet 9 5/8 "
3,055' MD
2389' TVD
PRODUCTION 12,094 feet 7
12,129' MD
7229' TVD
OPEN HOLE 4,260 feet 6 1/8 "
16,389' MD
7237' TVD
Perforation depth: Measured depth:
12129-16289 feet
open hole True Vertical depth:
7228-7237 feet
Tubing (size, grade, measured and true vertical depth)
3,5 "
L-80
11,514' MD 7,047' TVD
Packers and SSSV (type, measured and true vertical depth)
PACKER -BAKER SAB -3
PACKER W/N 11,418' MD
6,997' TVD
12. Stimulation or cement squeeze summary:
SSSV - CAMCO TRM 4E 2,305' MD 1,955' TVD
Intervals treated (measured): N/A
Treatment descriptions including volumes used and final pressure:
13.
Representative Daily Average Production or Injection Data
Oil -Bbl
Prior to well operation: 297
Gas-Mcf
Water -Bbl Casing Pressure Tubing Pressure
Subsequent to operation: 407
1938
2243
58 519 195
14. Attachments (required per 20 AAC 25.070, 25.071, 8 25.283)
15. Well Class after work:
106636 202
Daily Report of Well Operations 0
Exploratory ❑
Development Q Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work:
Oil
Printed and Electronic Fracture Stimulation Data ❑
Gas ❑ WDSPL ❑
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
SUSP❑ SPLUG❑
Sundry
Number or N/A if C.O. Exempt:
319-319
Authorized Name: Steve Drake
Contact Name: Steve Drake
Authorized Title: Sr. Wells Engineer
Contact Email: steve.g.drake@cop.com
Authorized Signature: F--TGLDate:
Contact Phone: (907) 263-4062
Form 10-4134 Revised 4/2017 /r /
sI �� rRBDMS'' SEP 0 4 2019 Submit Original Only
CD2 -58
PERFORATION
DTTM JOBTYP SUMMARYOPS
8/2/19 PERFORATIONS WELL FLOWING ON ARRIVAL
LRS S/I AND FREEZE PROTECT TUBING & FLOWLINE.
PERFORATED FROM 11,600' - 11,625' RKB WITH 2-3/8" x 25'
CARRIER, LOADED 5 SPF, 90 DEGREE PHASED, 11 GM
CONNEX CHARGES. CORRELATED TO SPERRY-SUN DUAL
GAMMA RAY DATED 24 -MAY -03. IN PROGRESS
8/3/19 PERFORATIONS PERFORATED FROM 11,550'- 11,575' RKB WITH 2-3/8" x 25'
CARRIER, LOADED 5 SPF, 90 DEGREE PHASED, 11 GM
CONNEX CHARGES. CORRELATED TO SPERRY-SUN DUAL
GAMMA RAY DATED 24 -MAY -03. READY FOR SLICKLINE
8/3/19 PERFORATIONS B&F TBG WITH FB-BLB & 2.69" G.RING TO 11520' RKB. IN
PROGRESS.
8/4/19 PERFORATIONS SET 2.81" ROCK SCREEN ASSY (XN-LOCK,XO & SCREEN/ OAL
= 61.5") @ 11503' RKB. SET 2.81" ISO SLEEVE (OAL = 49.51
FRUDENBERG PKG) @ 2305' RKB. "GOOD C/L INTEGRITY".
COMPLETE.
8/13/19 PERFORATIONS PULLED & REPLACED ISO SLEEVE @ 2305' RKB. GOOD
INTEGRITY ON C/L. JOB COMPLETE.
CDNd, Yppeas ZM12 PM
WNS PROD
WELL -NAME
CD2 -58
WELLBORE
CD2 -58
_................_..............__........___.........................._.....
Last Rev Reason
RANGEa aha
Annotation
End.. WeI1EOre LasiMM BV
ConocoPh(lbps
Well Attributes
811312019 CD2 -58 bosnmpn
Max Angle & MO
TD
Alaska im
IAL rvame
ALPINE
IW¢IlWre APRvv
50103204900
Iwelloore status
PRDO
n=IPI m01nxa1
J1d 1 sa]nl
an Orm lnN9
1R )Para
CDNd, Yppeas ZM12 PM
Last Tag
W. sch'sne&ovedep
Ann...n CeFREMS1 I EM Otte milbee IatMo4By
LAST Iag: PIKE 337530 ]IBI2019 CD2 -58 Idayt,
_................_..............__........___.........................._.....
Last Rev Reason
RANGEa aha
Annotation
End.. WeI1EOre LasiMM BV
Rev Reason Swap ISO SIV
811312019 CD2 -58 bosnmpn
Cuing Strings
Colne Dee-ppere ODOnl IDO^I Top (BAR)lel DePln )rant) sal wpt llVol._wnen lL.. AK
SE rnreaa
CONDUCTOR Insulated 18 1506 370 1140 114.0 62.50 H40 WELDED
40"
Ceamp oea"Rent oD Onl Daid Tap Me) sn Depth Inns) sw Death pw)... wuLma.. Grade ropmrwd
SURFACE 95/8 892 36.11 30553 2,389.1 36.00 J-55 BTC
C.11 DeacriPlbn OO III IO (in) ToSet Depth ME) Set OepN RV01... Wtllan ll... GudeTpp T11rw0
PRODUCTION 7 628 34.6 12,128.9 ],228.7 26.00 L-80 BTQh
CONDUCTORIPvudwvd�
Szol+a111,°
CUIne Deamgbn OD ne ID an) Tm(M91 Set Oepta III Set DeWn fiVDl... Wlae, ll... Grade Top Th al
OPEN HOLE 6118 12,129.0 16,3890 ),23)0
Death p Geacriplon pope) IGllnl Top IMBI Set Depnr MOR Set "Oth IND)... VALen p... Gtech Top Thmad
Window Lt 61/8 122000 12,2100 7,231.3
Tubing Strings
ISO SLEEVE: 2.3153
SAFENRV:23�.4
Tub,"Deelhottn taring Me, JID ant TOp IhRBI $et B.P. In,ael.,K IND) I... Wt nawa Gratle Top Connection
TUBING 31/2 2.99 328 11,514.3 ],04].1 9.30 L-80 EUE MOD
Completion Details
Top IND) Topincl Nominal
ToplME) (Ms) 1') Mm Des Co. 1. s')
32.8 328 0.12 HANGER FMC TUBING HANGER 4.500
121.5 121.5 0.46 XO-ReduCng X045113.5"TUBING 3.500
73054 1,954.6 53.90 SAFETYVLV UAMUO I RMAE bCSSV - LOCKED UUT 4B20121SO SI 2.812
SET 3/24/18
SURFACE.."..R..-
11,331.4 6,950.9 51.15 SLEEVE -G BAKER UMPA SUDING SLEEVE .12.81X PRO ILE ICL 2810
]1512(03)
11,417.5 6.9974 57.91 PACKER BAKER SAB -3 PACKER wIMELOUT EXTENSION 3.875
GAS LIFT: 5150
11,503.0 7,041.5 80.39 NIPPLE HES 2,81 ID AN'NIPPLE w/275"NO GO 2.750
11,513.8 T, 046.8 60.83 WLEG WIRELINE ENTRY GUIDE 3.875
Other In Hole (Wireline retrievable plugs,
valves, pumps, fish, etc.)
TopINDI
Topincl
Top MET
Mal
(1)
see
Com
RunOW
1090)
ons -'.%154,
2,3054
1,954.6
53.90
ISOSLEEVE
svXTO IS0 SLEEVE EXT LOW
81132019
1.750
DAL= 4'-2", PKG=FRUEDENBER, ORING & 262 PKG
11,503.0
7,041.5
fi0 99
ROCK SCREEN
2.813"XN-LOCK w/ROCK SCREEN (GATES 1.5')
&42019
I OOOO
Perforations & Slots
Shot
Dena
Top IND) 61m RVo1 One"A"
Tpp1Ms) atm mK9) IRI IM.) them zone sale 1 Type Com
11,550.0 11,5]5.0 ].064.1 7,075.5 IDW019 5. AP Fill By pass perforations
ons LIFT 1i 2427
11,600.0 11,825.0 ],086.9 ],098.1 82/2019 5.0 APERF Fill Bypass pe ro8on6
11,6500 11,6]50 7,1119,) 7,120.2 71282019 50 APERF itnaBypaseperneasuods
Frac Summary
SLEEVEC. 11, 3314
a.. who Proppani Celle^tlp0) Pvd,ed In Forman," lb)
3N 112006
9p•
1
SMOap Tdp DepM(I eat (Me) Link to Fluk syahm Val Ckm 1089 Vol tlurrylbbq
3/112008 112.128.0 16,389.0
Mandrel Inserts
at
SO
114175
on Tap 1ND) Valve IyCh Parts" TRO Run
N Toppea) MER Make MoWI ODP Sere Typa T. V.) (pap Run DO Com
1 5,0150 3,419Z ICAMCO IKBUG 1 1 1 GAS LIFT GLV BK 0186 1,842.0 119200
2 9,1549 5,7480 CAMCD KBUG 111.1 LIFT GLV BK 0168 T]]80 21620P
3 11,2427 6,903.0 CAMCD IKBUO I I I1foPLI1I 11v ibim 0250 00 2/6201]
Notes: General & Safety
N1vPLE: 11"'
ROCKSCRE[µli,en
End Dare Renowned
6182003 NOTE:MULTI-LATERAL WELL: THIS VIEW MAIN LEG
371 003 NOTE: TREE FMC. 1/185K- TREE GAP CONNECTION. T'OTIS
VY.EG: 11 slab
1 009 NOTE'. VIEW SCHEMATIC SIAlaska SEhannutboga
APaaP.ltmGnsnb-
MERF, 11.130DD TS25.o�
APERF; 11.fiW.G1l.s25p�
PRODUCTION; 30.&121m.e
Wvgcx L1: 12pO 612.2100
IIII
FRAC: 121.0
OPEN XOIE', 12,1.618,:♦Wp
)111
ORIGINATED
ALASKA E -LINE SERVICES
42260 Kenai Spur Hwy
PO BOX 1481- Kenai, Alaska 99611
PH: (907) 283-7374 FAX: (907) 283-7378
DELIVERABLE DESCRIPTION
203005
Alpine
31085
BP North Slope
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aids
900 E. Benson Blbd. - Anchorage, AK
0 ( 0 ( 0
Conoco Phillips Alaska Inc. AU6 0 9 2019 1 0 1 0
Attn: NSK-69
700 G Street AOGCC
Anchorage, Alaska 99501
AOGCC 0 1 0 1
ATTN: Natural Resources Technician II
Alaska Oil & Gas Conservation Commision
333 W. 7th Ave, Suite 100 - Anchorage, AK 99501-3539
Attn: Garrett Brown -Geologist I
DNR, Division of Oil & Gas
550 West 7th Ave, Suite #1100 -
AK 99501
11
0 1 1
Print Nam ' S.— ture4
Please return via e-mail a copy to both Alaska E -Line Services and Co 0 0 Phillips Alaska:
THE STATE
°fALASKA
GOVERNOR MIKE DUNLEAVY
Steve Drake
Sr. Wells Engineer
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510
.Re: Colville River Field, Alpine Oil Pool, CRU CD2 -58
Permit to Drill Number: 203-085
Sundry Number: 319-319
Dear Mr. Drake:
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907276.7542
v .aogcc.alaska.gov
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner A
DATED this 9 �d'ay of July, 2019.
4BDMSL'"' JUL 10 2019
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
JUL C 1 2019
A 1'''01f,f'. r.
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑
Suspend ❑ Perforate El Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other. ❑
2. Operator Name:
4. Current Well Class:
5. Permit to Drill Number:
ConocoPhilli sAlaska Inc.
Exploratory ❑ Development El
Stratign is ❑ Service ❑
203-085
3. Address:
6. API Number:
P. O. Box 100360, Anchorage, Alaska 99510
50-103-20457-00-00
7. If perforating:
8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool? N/A
CRU CD2 -58
Will planned pertorations require a spacing exception? Yes ❑ No O
9. Property Designation (Lease Number):
10. Field/Pool(s):
a
ADL 380075
'
Colville River Field /Alpine Oil Pool
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD):
Junk (MD):
16,389' 7,237' 16389 7237 2500psi NONE
NONE
Casing Length Size MD TVD Burst
Collapse
Conductor 77' 16" 114' 114'
Surface 3,019' 95/8 3,055' 2,389'
Production 12,094' 7" 12,129' 7,229'
Perforation Depth MD (ft):
Ilderforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
open hole 12129-16389
7228.7237
3.500"
LA0
11,514'
Packers and SSSV Type:
Packers and SSSV MD (ft) and TVD (ft):
PACKER - BAKER SAB -3 PACKER
MD= 11418 TVD= 6997
SSSV -CAMCO TRM4E
MD=2305 TVD=1955
12. Attachments: Proposal Summary Wellbore schematic
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑
Exploratory ❑ Stratigraphic ❑ Development [D Service ❑
14. Estimated Date for 7/15/2019
15. Well Status after proposed work:
Commencing Operations:
OIL O WINJ ❑ WDSPL ❑ Suspended ❑
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
16. Verbal Approval: Date:
Commission Representative:
GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Authorized Name: Steve Drake Contact Name: Steve Drake
Authorized Title: Sr. Wells Engineer Contact Email: steve.g.drake@cop.com
Contact Phone: (907) 2634062
Authorized Signature: Dale: Z
COM ISSION SE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number: I • �r I
'L✓'
Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑
Other:
RBDMS 41�^ JUL 10 2019
Post Initial Injection MIT ReiYes C1 No
Spacing Exception Required? Yes [:]No Ce Subsequent Form Required: 1,0-40+
APPROVED BY 7
Approved by: COMMISSIONER THE COMMISSION Date
�,3A1111llli'l vTz79`9 ORIGINAL
Submit Form and
m tacos Revised 4/2017 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate
�k *13A
WNS PROD WELLNAME CD2 -58 WELLBORE CD2 -58
Conol:D 1• �' ` Well Attributes Max Angle & MD TD
`�%I r�!��irl l'I'' M Name WeIIEde APUUWI WeIIWre sams nCl lel MOIXKB Act BimHKBI
Naska, Inc. AriPINE 501032045700 PRDN ]ta taaaTnt Inas.
OCKED OUT ISO SLV I 1 h an
"mOW ll/dt9flsuaa M1
Last Tag
Vagica p 'anew,
A -mourn as IsmatI EndWW Welli Lail Mod By
Last Tag: RKB 11pD.0 12019 CD2 -58 Clap9
.......... ..............._.................
.......______..."
Last Rev Reason
HANOER:Ila
Amg G. EM Bah Wdltore LZNModey
Rev Reason'. CUT Paraffin B Tao 41"2019 CO2 -58 Iclayl,
Casing Strings
rip
Caamp De unon Oran) ID (in) Too (Had"sed Depm lXRe) sd Capt.(Tom) WVLen I1... Gra do Top Thmad
CONDUCTOR Insulated 16 15M 37.0 114.0 114.0 62.50 H-00 WELDED
40"
Casing Deal plion OD and IO int TOp IXNBI 9N MpN atl(BI SetDryM rTVpL.. WIMn a.. Grade Top Tbead
SURFACE 9518 8.92 36.6 3,0553 2,389.1 36.W J-55 BTC
CWng Oexdptbn OD (in) ID 1131 TOP (W81 Bd Costa tri as, Earth (NDI... abi II... Gi ToPToread
PRODUCTION 7 6.20 348 12,1289 7,220.7 26.00 LA0 BTCM
CONDUCTOR mamame HE
Casing Dezcriplbn OD (in) ban) TO atllB) Bet OepM IRKBI Se1Deal 1M11... agna a... Gnde Top iareM
OPEN HOLE 6118 12,129.0 16,3090 7,23]0
3..1140
Casing Description OD Hi ID (in) RP(MB) atl repo aMB) ad OepM lN01... Wll h.. and. Top Thmd
Window IT 6118 122W.O 12,2100 7,231.3
Tubing Strings
Tubing Descnptun sbi,p Ma... mliol T1P8mSBI saroapm 1X..43 oepm(11HI...WtaIJN) Grade Top Commotion
TUBING 312 2.99 328 11,514.3 7,0471 9.30 LA0 FILE MOD
Completion Details
ISO SLEEVE'. 2301
&1FE1VKV 200&4
Top Me) Topma Nominal
Top 1348) LI (•1 IRm Des Com IG(m)
32.8 US 012 HANGER FMC TUBING HANGER 4.500
121.5 121.5 046 70-Reducilg SO 4.5x3.5"TUBING 3.500
2,305.4 1,954.6 53.90 SAFETYVLV AMGOTRMA -L KEDOUT41820 ;I L VE 2.812
SET 324118
11,3314 6,9509 57.15 SLEEVEL BAKER CMPA SLIDING SLEEVE wQ 81•X'PROFILE (CLOSED 2.81
71512003)
11,417.5 6.997A 57,91 PACKER BAKER SABA PACKER WIMILLOUT EXTENSION 3.875
aURFACE9....a—G�
',
11,503.0 7,041.5 60.39 NIPPLE HES 2.BVID'XN' NIPPLE .12.75"NOGO 2.750
11,513.8 7,046.8 60.83 WLEG WIRELINE ENTRY GUIDE .75
Other In Hole (Wireline retrievable plugs,
valves, pumps, fish, etc.)
Ge8 11,s.Mir
Top(N(B)
Top pvD)
a1KB1
Tor,""
PI Des
Com
Run Case
IDan)
2,305.0
1,954.4
53.90 ISO6LEEVE
wl L EV EXTLO
9x812018
1.75
JZIH"X�L
DAL= 4'-2", PKG=FRUEDENBER, ORING 8 2.82 PKG
Frac Summary
.UFT', 81519
aYHDNa Proppant CespnMab) pmppentln Fomnlbnabl
31112006
at' sCH-so iop Deplb tual BM (RRBI LInMro Fluil Bysbm Vd Clon 1401 VOIsImrylWp
1 31112006 12.129.0 16.389.0
Mandrel Inserts
w
H Tap[N01 Valve Lath PaXSW —.Us
Tap (XI(B) 411(6) MCMe Madel OO and &ery Type Type that best Run DaM C.
5,0150 3,4195 CANDO KBUG AS LIFT GLV JUN I 01M 1,8420 W7
2 9,154.9 5,.748.0 CANDO KBUG 1 GAS UFT GLV BK 0188 1,7760 2I620T7
3 112427 6.903.0 CAMCO KBUG 1 AS LIFT OV BTM 0250 0.0 21612017
GAS LIR: 11 N 7
Notes: General 8 Safety
EM 0. pnndalun
2003 NOTE:MULTI-LATERAL WELL: THIS VIEW MAIN LEG
3 NOTE:TREE: Fail 411165K- TREE CAP CONNECTION: J' OTIS
TOWN— INUIL VIEWbCHEMATICw/Alaska chemamc90
SLEMI 11,914
PACKER: 11,4175
NIPPLE', 11,590
WLEG; 11.51a!
PRODUCTION:%&12,1al
++33yy
�tIF
Wassi 1230.a1$2's.
1111
FRAC', 12.IMO
O )1
OPEN HOLE; 13,129018,99.0
s
General Well Work Request Form
Well: CD2 -58 Date of Request:
Request SPOC:
Well Type: Producer Req. Written by:
Job Scope: Pert -E -Line Shut -In Reason Code:
Well Shut in Date (if SI)
Prioritization Category
Network Description:
Budget Category: I Alpine Base Expense -CD2 Network:
Job i SAP Comment:
6/13/2019
Alpine PE, 943-0103
Stefan Weingarth, 265-6038
260 Perforate / Pert Support
Opportunity/Rate Adding
10417627
CD2 -58 PERFORATIONS (PROD)
Well Work Justification & Objectives:
CD2 -58 is an Alpine C -Sand producer with a history of sand bridge issues (openhole frac in 2006). The objective of this job will be to perform
logging, then perforate production casing to bypass a fill choke in the production casing and allow for flow bypass.
Well Details:
SSSV: locked out TRMAXX-SE at 2322' RKB with isolation sleeve deployed
Tubing volume to 2305': 20 bbls
Frac'd in 2006. History of inflowing sand - latest fill depth tag at 11,727' in 7" production casing
*Details needing review after logging/drift & tag steps
Slickline/E-line:
1) RU. PT equipment.
2) Drift tubing with gauge ring to 2305' RKB.
- Note any tight spats or high tags. If any solids are recovered on tools, take note in WSR. If wax is tagged - run scratchers, gauge rings & flow as
needed to remove wax.
3) Pull isolation sleeve at 2305' RKB.
4) Drift tubing to tag fill depth in production casing.
5) MU gamma/CBL/CCL toolstring.
6) RIH to depth tag. Log upward at 50k/min from depth to surface
- Logging speed is vital to give sufficient time for gamma rays to absorb into tool.
7) RDMO. Turn well over to DSO to BOL.
Slickline/E-line: (returning after Ions Processed)
1) RU. PT equipment.
2) Drift tubing with with gauge ring to 3500'.
3) Drift tubing with dummy perf guns to verify previous fill tag depth. Scrape wax and flow as needed until tubing is cleared.
4) MU perforating toolstring with following specs:
1. 2" OD Powerlet Omega 2006 gun system
ii.6 shots/ft
iii. 60 degree phasing
5) RIH, using previously run logs for depth correlation to perforate production casing while underbalanced (inclination ^'59°)
a. 11,550-11,575'
b. 11,600-11,625'
c. 11,650-11,675' OR target last perforation run 10' above fill tag depth
L Perforate with well shut in.
ii.Perform X runs with each 25' gun
6) Record WHP before and after perforation.
7) Set isolation sleeve across locked out TRM-4E at 2305' RKB.
8) Coordinate with DSO to verify iso sleeve holds pressure.
9) Hand well over to DSO to BOL.
- Inform board operator to slowly bring online to ensure fill isn't shifted higher up production casing.
CD2 -58 Lagging and Pedante Using 6.13.19.xlsm Pnnted 6/27/2019
Wall Work is not justified via increased production Preventive Maintenance Program Request
Current Well Data
After Well Work Data
Current Oil Rate (BOPD)
260
Post -Job Oil Rate (BOPD)
400
Risked NOB (BOPD)
Enter Rates
Last SBHP
1440
psi Last Tag
11,727'md
H2S (PPM):
50'ppm
SBHP Date
2/5/2017
Tag Date
4/1/2019
Any Fluid Restriction on Well?
No Water
SBHP Datum (TVD/SS?)
7000
SS Max Inclin.
59°
Max Dogleg
7° / 100' and
Min. I.D. (attabove work)
2.75"
Max Ind. Depth
4,300'md
Max Dogleg Depth
1,100'md
Well Work Justification & Objectives:
CD2 -58 is an Alpine C -Sand producer with a history of sand bridge issues (openhole frac in 2006). The objective of this job will be to perform
logging, then perforate production casing to bypass a fill choke in the production casing and allow for flow bypass.
Well Details:
SSSV: locked out TRMAXX-SE at 2322' RKB with isolation sleeve deployed
Tubing volume to 2305': 20 bbls
Frac'd in 2006. History of inflowing sand - latest fill depth tag at 11,727' in 7" production casing
*Details needing review after logging/drift & tag steps
Slickline/E-line:
1) RU. PT equipment.
2) Drift tubing with gauge ring to 2305' RKB.
- Note any tight spats or high tags. If any solids are recovered on tools, take note in WSR. If wax is tagged - run scratchers, gauge rings & flow as
needed to remove wax.
3) Pull isolation sleeve at 2305' RKB.
4) Drift tubing to tag fill depth in production casing.
5) MU gamma/CBL/CCL toolstring.
6) RIH to depth tag. Log upward at 50k/min from depth to surface
- Logging speed is vital to give sufficient time for gamma rays to absorb into tool.
7) RDMO. Turn well over to DSO to BOL.
Slickline/E-line: (returning after Ions Processed)
1) RU. PT equipment.
2) Drift tubing with with gauge ring to 3500'.
3) Drift tubing with dummy perf guns to verify previous fill tag depth. Scrape wax and flow as needed until tubing is cleared.
4) MU perforating toolstring with following specs:
1. 2" OD Powerlet Omega 2006 gun system
ii.6 shots/ft
iii. 60 degree phasing
5) RIH, using previously run logs for depth correlation to perforate production casing while underbalanced (inclination ^'59°)
a. 11,550-11,575'
b. 11,600-11,625'
c. 11,650-11,675' OR target last perforation run 10' above fill tag depth
L Perforate with well shut in.
ii.Perform X runs with each 25' gun
6) Record WHP before and after perforation.
7) Set isolation sleeve across locked out TRM-4E at 2305' RKB.
8) Coordinate with DSO to verify iso sleeve holds pressure.
9) Hand well over to DSO to BOL.
- Inform board operator to slowly bring online to ensure fill isn't shifted higher up production casing.
CD2 -58 Lagging and Pedante Using 6.13.19.xlsm Pnnted 6/27/2019
STATE OF ALASKA
AKA OIL AND GAS CONSERVATION COIV SION
REPORT OF SUNDRY WELL OPERATIONS
1.Operations Abandon r Rug Perforations r" Fracture Stimulate r Pull Tubing r Operations Shutdow n
Performed: Suspend Perforate Other Stimulate Alter Casing Change Approved Program r
Rug for Redrill r Perforate New Pool r Repair Well Re-enter Susp Well r Other:Scale Inhibitor Treatment J
2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number:
ConocoPhillips Alaska, Inc. Development p- Exploratory r 203-085 _
3.Address: 6.API Number:
P. O. Box 100360,Anchorage,Alaska 99510 Stratigraphic Service [` 50-103-20457-00
7.Property Designation(Lease Number): 8.Well Name and Number:
ADL 380075 CRU CD2-58
9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s):
none Colville River Field/Alpine Oil Pool
11.Present Well Condition Summary:
Total Depth measured 16389 feet Plugs(measured) none
true vertical 7237 feet Junk(measured) none
Effective Depth measured 16389' feet Packer(measured) 11418
true vertical 7237' feet (true vertical) 6997
Casing Length Size MD TVD Burst Collapse
CONDUCTOR 77 16 114 114
SURFACE 3019 9.625 3055 2389
PRODUCTION 12094 7 12129 7229'
RECEIVED
AUG 272015
Perforation depth: Measured depth: open hole 12129'-16389' � '- ���
True Vertical Depth: 7228'-7237' Al1( F 7 .,1� .
Tubing(size,grade,MD,and TVD) 3.5, L-80, 11514 MD, 7047 TVD
Packers&SSSV(type,MD,and TVD) PACKER-BAKER SAB-3 PACKER W/MILLOUT EXTENSION @ 11418 MD and 6997 TVD
SAFETY VLV-CAMCO TRM-4E SCSSV, LOCKED OUT/WRDP INSTALLED @ 2305 MD and 1955 TVD
12.Stimulation or cement squeeze summary:
Intervals treated(measured): 12129'-16389'
Treatment descriptions including volumes used and final pressure: see attached summary
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 565 324 101 1535 201
Subsequent to operation 626 66 91 1541 194
14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations 17 Exploratory fl Development ' Service r Stratigraphic r
Copies of Logs and Surveys Run r 16.Well Status after work: Oil pl. Gas r WDSPL
Printed and Bectronic Fracture Stimulation Data r GSTOR r WINJ r WAG r GINJ r SUSP r SPLUG E
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
none
Contact KerryFreedman 265-6579 Email Ker .C.Freedman(a�conocophillips.com
Cad ry
Printed Name Kerry Freedman Title Principal Production Engineer
Signature 4 Phone:265-6579 Date 6 Cv,1
kTL lltie15
/q4 RBDMS UG 2 7 2015
Form 10-404 Revised/5/2015 Submit Original Only
• •
CD2-58 Scale Inhibition Treatment
7/28/15
Hybrid Scale Inhibitor Squeeze Job pumped 7/28/15 from 11:30 to 20:30.
LRS= Little Red Services
- Initial pressure TBG/IA/OA-468/1488/511
- LRS pumped 155 bbls Diesel/M209/WAW5206 pre-flush at 1-2 bpm,TBG/IA/OA-0/1239/555
- LRS pumped 155 bbls Seawater/SCW3001WC scale inhibitor main treatment at 2 bpm,
TBG/IA/OA—0/1112/596
- LRS pumped 1,661 bbls Dead Oil/M209 over-flush at 2—5 bpm,TBG/IA/OA—148/1119/692
Interval treated: 12,129'—16,389'
, , WNS PROD CD2-58
411)
ConocopAh�illips 1' Well Attributes` Max Angle'&,MP TD
Alaska,Inc. �,. �i Wellbore API/UWI Field Name rWeilbore Status nel(°) MD(ftKB) Act Btm(ftKB)
,-,,,,c>o1xn,Pr ` 501032045700 ALPINE PROD 97.14 16,347.01 16,389.0
..- Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date
CD2589/30/2013 2-48'39 PM SSSV:WRDP Last WO: 43.991 6/9/2003
-,. Vert cal schematw(actuap Annotation Depth(ftKB) End Date Annotation Last Mod By End Date
Last Tag Rev Reason:RE-SET WRDP hipshkf 9/26/2013
Casing Strings --------':---Y,-,-3'1,:,,,,,
HANGER,328 e8 Casing Desoription OD(in) ID(in) Top(OKB) Set Depth(RKB) Set Depth(TVD).. Wt/L...e (I...Grade Top Thread
CONDUCTOR Insulated 16 15.062 37.0 114.0 114.0 62.50 H-40 WELDED
40"
Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread
t SURFACE 95/8 8.921 36.6 3,055.3 2,389.1 36.00 J-55 BTC
31 Casing Description OD(i n) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...WtlLen(1...Grade Top Thread
_ PRODUCTION 7 6.276 34.6 12,128.9 7,228.7 26.00 L-80 BTCM
Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(1...Grade Top Thread
OPEN HOLE 61/8 12,129.0 16,389.0 7,237.0
Ca g Description OD lin) ID(In) Top(ftKB) Set Depth1T,11.31)0 Set Depth(TVD) WOL (I...Grade Top Thread
Window Ll 61/8 12200.0 122100 72313
{ Tubing Strings , oaf" 1, t s at
-tI Tubmg Description String Ma...ID(in) Top(RKB) Set Depth(R..'Set Depth(TVD)I.. Wt(Ib/ft) Grade Top Connection
TUBING 312 2.992 32.8 11,514.3 7,047.1 9.30 L-80 EUE MOD
Completion Details _:
CONDUCTOR Insulated 40", -
37.0-114.0 N inl
Top(ftKB) Top(TVD)(ttK8) Top Incl(°) Item Des Com (in)
32.8 32.8 0.12 HANGER FMC TUBING HANGER 4.500
121.5 121.5 0.46 XO-Reducing XO 4.5x3.5"TUBING 3.500
2,305.4 1,954.6 53.90 SAFETY VLV CAMCO TRM-4E SCSSV-LOCKED OUT 4/8/2012; 2.812
WRDP SET 4/9/2012
11,331.4 6,950.9 57.15 SLEEVE-C BAKER CMPA SLIDING SLEEVE w/2.81'X'PROFILE 2.810
SAFETY VRDLVP;2305.51
5.4 - (CLOSED 7/5/2003)
;230 ',<q
11,417.5 6,997.4 57.91 PACKER BAKER SAB-3 PACKER w/MILLOUT EXTENSION 3.875
11,503.0 7,041.5 60.39 NIPPLE HES 2.81"ID'XN'NIPPLE w/2.75"NO GO 2.750
11,513.8 7,046.8 60.83 WLEG WIRELINE ENTRY GUIDE 3.875
1 Other In}foie(Wireline retrievable plugs,velves,ptiM i f sh4 eta. ,i {",^*-
Top(TVD) Top Incl
Top(ftKB) (RKB) (°) Des Com Run Date ID(in)
2,305.5 1,954.7 53.90 WRDP WRDP(HTS 618)SET AFTER SSSV LOCKED OUT 9/26/2013 1.560
4/8/2012
Stimulations&Treatments '! s .
SURFACE;36.6-3,0553-a Min Top Max Btm
Depth Depth Top(TVD) Btm(TVD)
(ftKB) (ftKB) (ftKB) (ftKB) Type Date Com
12,129.0 16,389.0 7,228.7 7237.0 FRAC 3/11/2006 FLUSH W/44 BBLS ow WF-25 and 79 BBLS OF
DIESEL.PUMPED 3080818 16/30 3080751 IN
PERFS ISIP=3407 PSI
GAS LIFT.5,015.0 k
Mandret Details -
at
R c
on Top(TVD) Valve Latch Port Size TRO Run 0
No Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date m
1 5,015.0 3,419.5'CAMCO KBUG 1 GAS LIFT DMY BK 0.000 0.0 3/5/2006
2 9,154.9 5 748 0 CAMCO KBUG 1 GAS LIFT GLV BK 0.188 1,771.0 3/21/2006
GAS LIFT,9,154.9 3 11,242.7 6,903.0 CAMCO KBUG 1 GAS LIFT OV KB 0.156 0.0 12/2/2009
Notes:General&Safety " A, .K.Ax.iwr ,.
End Date Annotation
6/8/2003 NOTE:MULTI-LATERAL WELL:THIS VIEW MAIN LEG
6/9/2003 NOTE:TREE:FMC 4 1/16 5K-TREE CAP CONNECTION:7"OTIS
12/3/2009 NOTE:VIEW SCHEMATIC w/Alaska Schematic9.0
I
GAS LIFT;11,242.7
I
I
I
SLEEVE-"1
I
PACKER.11.4175 ,a7_5:,,
I
NIPPLE;11.503.0 ..a
WLEG;11.513.8
PRODUCTION;34.6-12,126.9
Window L7;12,200.0.12,210.0 4}'.
FRAC;12,129.0
OPEN HOLE;12,129.0-16,369.0 °6 Y T ,
)mage . .bject Well History File C,,- )er Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
d03 - 0 gS Well History File Identifier
Organizing (done)
o Two-sided 11I1111111111111111
Äcan Needed
I
RESCAN
~Ior Items:
o Greyscale Items:
t
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Other, NolType:
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
o Other::
Date: <6 ;).. Lf / (;JS'/sl
, r I
1111)
BY: Helen ~
Project Proofing
BY: Helen ~
BY:
HeleCMaria)
ð x30= qa
+
Date: <ò ~Lf ()S 151 m £)
I a- = ~OTAL PAGES loa-
(CountAoes not inr.lude cover sheet) V\A-LJ
Date: 0 :llf OS Isl , J I
.' . I
Scanning Preparation
Production Scanning
Stage 1
Page Count from Scanned File: I () c:3 (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: ~YES NO
Heie~ Date:,?, 8..4/D0' Isf Y\{D
If NO in stage 1 page(s) discrepancies were found: YES NO
Bÿ:
Stage 1
BY:
Helen Maria
Date: Isl
II! 111/1111111 11111
11I1111111111111111
I
Date: 151
Quality Checked 11I1111111111111111
Scanning is complete at this point unless rescanning is required.
ReScanned
BY: Helen Maria
Comments about this file:
ConocoPhillips •
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510 -0360 RECEIVED
April 01, 2011
Aia ka ail 8 fins Cons. Commission
`;d cnoraga
Commissioner Dan Seamount
Alaska Oil & Gas Commission
333 West 7 Avenue, Suite 100 0 3 , -)
Anchorage, AK 99501 '' APR a
Commissioner Dan Seamount:
Enclosed please find a spreadsheet with a list of wells from the Alpine field (CRU). Each of
these wells was found to have a void in the conductor. These voids were filled with cement and
corrosion inhibitor, engineered to prevent water from entering the annular space. As per
previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the
treatments took place and meets the requirements of form 10 -404, Report of Sundry Operations.
The corrosion inhibitor /sealant was pumped March 13 -15 and March 27 -28, 2011. The attached
spreadsheet presents the well name, top of cement depth prior to filling, and volumes used on
each conductor.
Please call MJ Loveland or Perry Klein at 907 - 659 -7043, if you have any questions.
Sincerely,
MJ Loveland
ConocoPhillips Well Integrity Projects Supervisor
• •
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
Alpine Field
Date 04/01/2011 CD2 PAD
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name API # PTD # cement pumped cement date inhibitor sealant date
ft bbls ft gal
CD2 -14 50103203900000 2011770 4" n/a 16" n/a 5.4 3/14/2011
CD2 -16 50103204260000 2021440 4" n/a 14" n/a 3.6 3/14/2011
CD2 -17A 50103204060100 2051700 4" n/a 14" n/a 3.6 3/14/2011
CD2 -24 50103203770000 2010950 6" n/a 14" n/a 3.4 3/15/2011
CD2 -25 50103204180000 2020740 4" n/a 14" n/a 3.9 3/28/2011
CD2 -26 50103203970000 2012320 4" n/a 16" n/a 2.7 3/27/2011
CD2 -33B 50103203810200 2011250 4" n/a 15" n/a 2.7 3/27/2011
CD2 -41 50103204240000 2021260 4" n/a 14" n/a 4.3 3/28/2011
CD2 -50 50103204150000 2020490 8" n/a 16" n/a 3.5 3/27/2011
CD2 -51 50103204410000 2022490 5'10" 0.80 15" 3/21/2007 3.9 3/27/2011
CD2 -56 50103204980000 2041500 SF n/a 15" n/a 3.8 3/27/2011
* CA2 -58 50103204570000 2030850 6" n/a 6" n/a 3.5 3/28/2011
CD2 -59 50103205050000 2042480 6" n/a 6" n/a 5 3/27/2011
CD2 -60A 50103205110100 2091150 6" n/a 6" n/a 5.25 3/27/2011
CD2 -74 50103205910000 2081970 10'9" 1.20 9" 3/26/2011 1.7 3/27/2011
CD2 -76 50103206030000 2090980 32" n/a 32" n/a 9.7 3/27/2011
CD2 -78 50103206010000 2090660 6" n/a 6" n/a 1.7 3/27/2011
CD2 -466 50103205760000 2080950 8" n/a 17" n/a 3.4 3/27/2011
• •
,. ,-,.._
_~ ~
03/01/2008
DO NOT PLACE
.`~
~r
ANY NEW MATERIAL
UNDER THfS PAGE
F: \LaserFiche\CvrPgs_Inserts\Microfilm_Marker. doc
~
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
April 11, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West ih Avenue, Suite 100
Anchorage, AK 99501
:~CANNED APR 2 '1 2007
aO~- ørP
Dear Mr. Maunder:
Sorry for the inconvenience, however it was observed that a spreadsheet sent to you and dated
3/31/07 was incomplete.
Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). It was
noticed that Alpine well CD2-404 was unintentionally left out of spreadsheet dated 3/31/07.
Please find enclosed updated spreadsheet, and replace. As per previous agreement with the
AOGCC, this letter and spreadsheet serves as notification that the treatments took place and
meets the requirements of form 10-404, Report of Sundry Operations.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
~:l::~~
ConocoPhillips Well Integrity Project Supervisor
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTO# cement pumped cement date inhibitor sealant date
ft bbls ft Qal
C02-1 205-118 4" na 4" na 2 2/18/2007
C02-2 205-1 09 6" na 6" na 2.5 2/18/2007
C02-404 206-054 6" na 6" na 1.8 3/22/2007
C02-7 203-187 16" na 16" na 7.5 2/17/2007
C02-9 202-129 22" na 22" na 10.5 2/17/2007
C02-12 203-073 16" na 16" na 7.5 2/17/2007
C02-14 201-177 4" na 4" na 2 2/17/2007
C02-15 201-159 12" na 12" na 5.7 2/17/2007
CD2-16 202-144 11 '7" 1.6 4" 4/16/2003 1 3/8/2007
C02-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007
C02-18 203-151 36" na 36" na 17 2/17/2007
C02-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007
C02-21 204-245 6" na 6" na 2.5 2/18/2007
C02-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007
C02-24 201-095 6" na 6" na 1 3/8/2007
C02-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007
C02-28 202-217 29" na 29" na 11 3/8/2007
CD2-30 203-135 8" na 8" na 3 3/8/2007
CD2-31 204-082 15" na 15" na 6 3/8/2007
CD2-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007
CD2-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007
CD2-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007
CD2-37 202-211 29" na 29" na 13.8 2/18/2007
CD2-38 202-171 18" na 18" na 8.5 2/18/2007
C02-39 201-160 34" na 34" na 16.2 2/18/2007
CD2-44 202-165 13" na 13" na 6.2 2/18/2007
C02-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007
C02-47 201-205 25" na 25" na 11.9 2/18/2007
C02-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007
C02-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007
CO2-53 204-089 4" na 4" na 2 2/18/2007
CO2-54 204-178 8" na 8" na 3.7 2/18/2007
CO2-55 203-118 13" na 13" na 6 2/18/2007
CO2-57 204-072 8" na 8" na 1 3/8/2007
cœ..ti8 203-085 6" na 6" na 1 3/8/2007
CO2-59 204-248 6" na 6" na 1.5 3/8/2007
C02-60 205-068 6" na 6" na 1 3/8/2007
Alpine Field
March 31,2007
,
.
.
r
~
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
March 31, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
~D-,()qb
Dear Mr. Maunder:
"
-'ft·
¡,..;;;¡
Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). Some of
these wells were found to have a void in the conductor by surface casing annulus. The voids that
were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The
remaining volume of annular void subsequently was filled with a corrosion inhibiter engineered
to prevent water from entering the annular space. As per previous agreement with the AOGCC,
this letter and spreadsheet serves as notification that the treatments took place and meets the
requirements of form 10-404, Report of Sundry Operations.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
s1:;ANNED APR 0 9 2007
~~C
,..- Jerry Dethlefs
ConocoPhillips Well Integrity Proj Supervisor
Attachment
.
.
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTO# cement pumped cement date inhibitor sealant date
ft bbls ft gal
C02-1 205-118 4" na 4" na 2 2/18/2007
C02-2 205-1 09 6" na 6" na 2.5 2/18/2007
C02-7 203-187 16" na 16" na 7.5 2/17/2007
C02-9 202-129 22" na 22" na 10.5 2/17/2007
C02-12 203-073 16" na 16" na 7.5 2/17/2007
C02-14 201-177 4" na 4" na 2 2/17/2007
C02-15 201-159 12" na 12" na 5.7 2/17/2007
C02-16 202-144 11 '7" 1.6 4" 4/16/2003 1 3/8/2007
C02-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007
C02-18 203-151 36" na 36" na 17 2/17/2007
C02-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007
C02-21 204-245 6" na 6" na 2.5 2/18/2007
C02-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007
C02-24 201-095 6" na 6" na 1 3/8/2007
C02-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007
C02-28 202-217 29" na 29" na 11 3/8/2007
C02-30 203-135 8" na 8" na 3 3/8/2007
C02-31 204-082 15" na 15" na 6 3/8/2007
C02-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007
C02-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007
C02-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007
C02-37 202-211 29" na 29" na 13.8 2/18/2007
C02-38 202-171 18" na 18" na 8.5 2/18/2007
C02-39 201-160 34" na 34" na 16.2 2/18/2007
C02-44 202-165 13" na 13" na 6.2 2/18/2007
C02-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007
C02-47 201-205 25" na 25" na 11.9 2/18/2007
C02-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007
C02-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007
CO2-53 204-089 4" na 4" na 2 2/18/2007
CO2-54 204-178 8" na 8" na 3.7 2/18/2007
CO2-55 203-118 13" na 13" na 6 2/18/2007
CO2-57 204-072 8" na 8" na 1 3/8/2007
CO2-58 203-085 6" na 6" na 1 3/8/2007
CO2-59 204-248 6" na 6" na 1.5 3/8/2007
C02-60 205-068 6" na 6" na 1 3/8/2007
Alpine Field
March 31,2007
e
Conoc6Phillips
e
,..-~
Tim Schneider
Staff Production Engineer
Alpine Engineering
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6859
April 4, 2006
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West th Avenue Suite 100
Anchorage, Alaska 99501
<
d¡~ !1N~~~~r\
~'"Vì/'¡":'¡""\'
{,L~
3"QTJ
~
Subject: Report of Sundry Well Operations for C02-58 and C02-58L 1
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Reports of Sundry Well Operations
for the recent stimulation activity on the Alpine wells C02-58 and C02-58L 1.
If you have any questions regarding this matter, please contact me at 265-6859.
Sincerely,
U£
T. Schneider
Staff Production Engineer
CPAI Alpine Engineering
TSS/skad
1. Operations Performed: Abandon 0
Alter Casing 0
Change Approved Program 0
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360, Anchorage, Alaska 99510
7. KB Elevation (ft):
RKB 36.6', 52.5' AMSL
8. Property Designation:
ADL 380075
e
e
RECE'VED
,ô,PR 0 5 2006
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERA TIONSlaska Oil & Gas Cons. Commission
STATE OF ALASKA
Repair Well 0
Pull Tubing 0
Ope rat. ShutdownD
Stimulate []
Waiver 0
Plug Perforations 0
Perforate New Pool 0
Perforate 0
4. Current Well Status:
Development []
Stratigraphic 0
Other
Time Extension 0
o
Service
Re-enter Suspended Well
5. Permit to Drill Number:
203-085 1 306-073
6. API Number:
50-103-20457 -00
Exploratory 0
o
9. Well Name and Number:
CD2-58
11. Present Well Condition Summary:
10. Field/Pool(s):
Colville River Field 1 Alpine Oil Pool
Total Depth
Effective Depth
Casing
Structural
CONDUCTOR
SURFACE
PRODUCTION
OPEN HOLE
Perforation depth:
measured
16389'
7191'
feet
feet
feet
feet
true vertical
Plugs (measured)
Junk (measured)
measured
true vertical
Length
Size
MD
TVD
Burst
Collapse
80'
3019'
12093'
4260'
16"
9-5/8"
109'
3055'
12129'
16389'
109'
2389'
7228'
7237'
7"
6.125"
Measured depth: open hole
true vertical depth: open hole
Tubing (size, grade, and measured depth) 3-1/2" , L-80, 11514' MD.
Packers & SSSV (type & measured depth) Baker SAB-3 pkr@ 11418'
Cameo TRM-4E SSSV @ 2305'
12. Stimulation or cement squeeze summary:
Intervals treated (measured)
12129'-16389' md
see attached summary
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
*shares production with CD2-58L 1 Oil-Bbl Gas-Mef Water-Bbl Casin Pressure Tubin Pressure
Prior to well operation* 1219 2130 0 298
Subsequent to operation* 2824 2400 39 302
14. Attachments 15. Well Class after proposed work:
Copies of Logs and Surveys run _ Exploratory 0 Development [] Service 0
Daily Report of Well Operations _X 16. Well Status after proposed work:
Oil[] GasD WAG 0 GINJD WINJ 0 WDSPLD
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Form 10-404 Revised 04/2004
Contact
Printed Name
Signature
Tim Schneider @ 265-6859
Tim Schneider
Title
Phone
Staff Production Engineer
Date 'f-e( ~o&.
Pre ared b Sharon AlIsu -Drake 263-4612
~\lç
/
R ~.. ~ 1006
.~~~
~ '(~~riginal Only
I~IG r·.JAL
e
e
CD2-58 Stimulation results:
Summary of stimulation job:
3-11-06:
Pump frac stages in stair steps; 2,4, & 7 PP A, 2056 bbls total slurry, 79 bbls diesel for
freeze protect.. AIR-30 BPM, AIP-7200 psi, ISIP-3407 psi. 308,081Ibs. 16/30 White
Sand in perfs. ~
Well test
3/28/06: 2824 bopd, 39 bwpd, 2.4 mmcfpd , 302 psi WHP
e
ConocoPhUlips AI.a, Inc. ALPINE CD2-58
~ ..'i1:! n?ilšR"
TUBING API: 501032045700 Well Tvoe: PROD Anole ((j) TS: deo ((j)
(0-123,
00:4.500, SSSV Type: TRDP Orig 6/9/2003 Angle @ TD: 97 deg @ 16389
10:3.958) Comoletion:
SURFACE Annular Fluid: Last W/O: Rev Reason: FORMAT
(0-3055, UPDATE
00:9.625,
Wt36.00) Reference LOQ: 36' RKB Ref Loa Date: Last Uodate: 4116/2005
TUBING Last Tao: TD: 16389 ftKB
(123-11514, Last Tag Date: Max Hole 97 deg @ 16389
00:3.500, Angle:
10:2.992) Casino c.:;;:; iAII
'ROOUCTION
(0-12129, Descriotion Size Too Bottom TVD Wt Grade Thread
00:7.000, CONDUCTOR 16.000 0 109 109 62.50 H-40 WELDED
Wt26.00) SURFACE 9,625 0 3055 2389 36.00 J-55 BTC
PRODUCTION 7.000 0 12129 7228 26,00 L-80 BTCM
OPEN HOLE 6.125 12129 16389 16389 0.00
L 1 WINDOW 6.125 12200 13550 7288 0,00
Gas Lift yóbing String" TililR I NIt::·
MandrelNalve
1 Size I Too I Bottom I TVD I Wt I Grade I Thread
(5015-5016, 4.500 I 0 I 123 I 123 I 12.60 I L-80 I IBTM
3.500 I 123 I 11514 I 7046 I 9.30 I L-80 I EUEMOD
ea~Cift
St MD TVD Man Mfr Man Type V Mfr V Type VOD Latch Port TRO Date Vlv
Gas Lift Run Cmnt
MandrelNalve 1 5015 3420 CAMCO KBUG GLV 1.0 BK 0.188 1862 11/7/2003
2
(9155-9156, 2 9155 5748 CAMCO KBUG GLV 1.0 BK 0.188 1885 11/6/2003
3 11243 6903 CAMCO KBUG OV 1.0 BK 0.250 0 11/6/2003
Other ñIiiñê.ønii¡h., et(:~)"yl¡::\AJ¡;: ¡a1'J11
Depth TVD Type Descriotion ID
Gas Lift 33 33 HANGER FMC 4.5" TBG HANGER 4.500
MandrelNalve 2305 1954 SSSV CAMCO TRM-4E SSSV 2.812
3 11331 6951 SLEEVE-C BAKER CMPA SLIDING SLEEVE W/2.81" 'X' PROFILE - CLOSED 2.810
11243-11244, 7/9/2003
005.390) 11418 6997 PACKER BAKER SAB-3 PACKER WIMILLOUT EXTENSION W/3.875" ID 3.875
11503 7041 NIP HES 'XN' NO GO NIPPLE 2.750
11514 7046 WLEG 3.875
SLEEVE-C tiJôtes
11331-11332, Date Note
00:5.390) 6/8/2003 MULTI-LATERAL WELL: THIS VIEW MAIN LEG
6/9/2003 TREE: FMC 4 1/16 5K
TREE CAP CONNECTION: 7" OTIS
PACKER
11418-11419,
00:5.970)
NIP
11503-11504,
00:3.750)
OPEN HOLE
12129-16389,
00:6.125)
L 1 WINOOW
12200-13550,
006.125)
(II ·~.:.~Ù.'.. t77~b~·\·'~. t£~:::;j¡ ....,~:.u.'.:.~
~. . I' L~
,1\"11 1 t j ['~.
rü) : ¡ h~'~\" . .....
~,..' "'.;..... ,,-,g ,.J.!. ¡..""t ¡¡'-.-I,..:..:]
rT·
lL
)
!Ø 1 f~, ~~ .~ /ò\
~.J '"\ L..,."J l/ t\ t"_::,,, .,j\~ 1./ ~\.j
)
ALASIiA OIL AM) GAS
CONSERVATION COMMISSION
/
I
1·'/
i
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7TH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279·1433
FAX (907) 276-7542
Tim Schneider
Staff Production Engineer
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage, Alaska 99510
»3/01>5'
Re: Colville River C02-58
Sundry Number: 306-073 ." .. .,"~.,'" .,.. k\. t.)1 if 2.Dnb
"·....If·'.'''.' Jó. \,..~,~b'... \\~:;...t; '\ K.~: "I: t~1 p
\J"'l~"td,!'~~x,... ~. L .'
Dear Mr. Schneider:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
'---
DATED this.21cíay of February, 2006
Encl.
)
)
Tim Schneider
Staff Production Engineer
Alpine Engineering
Conoc6Phillips
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6859
February 24, 2006
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
RECEIVED
FEB 2 1 2006
A'aska Oil &. Gas COO$. Commission
Anchorage
Subject: Application for Sundry Approval for CD2-58 and CD2-58L 1
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Application for Sundry Approval for
the Alpine well CD2-58 and CD2-58L 1.
If you have any questions regarding this matter, please contact me at 265-6859.
Sincerely,
~' i',-,:
...~ . /"..i' ~_."O
,l'., ,.~, /¡1".et.<.%
T. Schneider
Staff Production Engineer
CPAI Alpine Engineering
TSS/skad
ORIGINAL
) f)f ~ Gf <7/( fÁl/V7/7{)/)k; RECEIVED
ALASKA OIL AND ~~;~g~~L:~~ON COMMISSION )/-) '\ FEB 2 7 2006
APPLICATION FOR SUNDRY APPROVlJftüa Oil & Gas Cons. Commission
20 MC 25.280 Anchorage
Operational Shutdown D Perforate D Waiver D
Plug Perforations D Stimulate 0 Time Extension D
Perforate New Pool D Re-enter Suspended Well D
5. Permit to Dri~ber:
203-085
6. API Number:
50-103-20457-00
9. Well Name and Number:
CD2-58
1. Type of Request:
Abandon D
D
D
Suspend D
D
D
Alter casing
Repair well
Change approved program
Pull Tubing
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360, Anchorage, Alaska 99510
7. KB Elevation (ft):
RKB 36.6', 52.5' AMSL
8. Property Designation:
ADL 380075
11.
Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft):
16389' 7191'
Casing Length Size
4. Current Well Class:
Development 0
Stratigraphic D
Exploratory D
Service D
Other 0
10. Field/Pool(s):
Colville River Field 1 Alpine Oil Pool
PRESENT WELL CONDITION SUMMARY
Effective Depth TVD (ft): Plugs (measured): Junk (measured):
MD
TVD
109'
2389'
7228'
7237'
CONDUCTOR
SURFACE
PRODUCTION
OPEN HOLE
16"
80'
3019'
12093'
4260'
1350'
109'
3055'
9-5/8"
7" 12129'
~~~~~.' , 16389'
.ÝftL" 'lþ if;) ""'- 13~50'
~
7288'
Perforation Depth MD (ft):
open hole
Packers and SSSV Type:
Baker SAB-3 pkr @
Camco TRM-4E SSSV @
12. Attachments: Description Summary of Proposal 0
Detailed Operations Program D BOP Sketch 0
14. Estimated Date for
Commencing Operations:
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name~i Schnei1er
Signature (A ( ~'. .¡ J./
~ ~({..., '-4:.~
Perforation Depth TVD (ft):
open hole
Tubing Size:
3-1/2"
Packers and SSSV MD (ft)
11418'
2305'
March 2, 2006
Date:
13. Well Class after proposed work:
Exploratory D Development 0
15. Well Status after proposed work:
Oil 0 Gas 0
WAG D GINJ 0
Contact:
Title:
Phone
Commission Use Only
Conditions of approval: Notify Commission so that a representative may witness
Plug Integrity 0 BOP Test 0
Mechanical Integrity Test 0
Location Clearance D
Other:
Burst
Collapse
Tubing Grade:
L-80
Tubing MD (ft):
11514'
Service 0
Plugged 0
WINJ 0
Abandoned 0
WDSPL 0
Tim Schneider @ 265-6859
Staff Production Engineer
Date ¿ --Z}<o &_
Sundry Number:
~ j'O tP - 0 7 ~
RBDMS 8Ft FEB 282006
COMMISSIONER
APPROVED BY
THE COMMISSION
OR\G\i~AL
Form 10-403 Revised 7/2005 ~
Date 'Z ..1" ,. 0 "
Submit in Duplicate
~LPINE
ConocoPhiUips Ala.n~, Inc.
0[)2';58
lUBING
(0-123,
00:4.500,
10:3.958)
SURFACE
(0-3055,
00:9.625,
Wt:36.00)
lUBING
(123-11514,
00:3.500,
10:2.992)
=>ROOUCTION
(0-12129,
00:7,000,
Wt:26.00)
Gas Lift
MandrelNalve
1
(5015-5016,
Gas Lift
MandrelNalve
2
(9155-9156,
Gas Lift
MandrelNalve
3
11243-11244,
00:5.390)
SLEEVE-C
'11331-11332,
. 00:5,390)
PACKER
:11418-11419,
00:5.970)
NIP
11503-11504,
, 00:3.750)
OPEN HOLE
"12129-16389,
" 00:6.125)
L 1 WINOOW
12200-13550,
" 00:6.125)
j t: I i ~
, '
11
II .
·l·.·
.,"
:'." ". .
.:,.,.
r';'i.~
CD2-58
API: 501032045700
SSSV Type: TRDP
Well Type: PROD
Orig 6/9/2003
Completion:
Last W/O:
Angle @ TS: deg @
Angle @ TD: 97 deg @ 16389
Annular Fluid:
Rev Reason: FORMAT
UPDATE
Last Update: 4/16/2005
Reference Log: 36' RKB
Last Tag:
Last Tag Date:
Ref Log Date:
TD: 16389 ftKB
Max Hole 97 deg @ 16389
~¡:¡sing$triÔg;··.·/&JLS:;rRI·rsJ~S
Description Size
CONDUCTOR 16.000
SURFACE 9.625
PRODUCTION 7.000
OPEN HOLE 6.125
L 1 WINDOW 6.125
Bottom
123
11514
Top Bottom TVD Wt Grade Thread
0 109 109 62.50 H-40 WELDED
0 3055 2389 36.00 J-55 BTC
0 12129 7228 26.00 L-80 BTCM
12129 16389 16389 0.00
12200 13550 7288 0.00
TVD Wt Grade Thread
123 12.60 L-80 IBTM
7046 9.30 L-80 EUEMOD
Top
4.500 0
3.500 123
6åšlllftf..itàhClrêlš/8Zalvêš
St MD TVD Man Mfr Man Type
V Mfr
V Type
VOD
Latch
GLV
GLV
OV
BK
BK
BK
Port TRO Date
Run
0.188 1862 11/7/2003
0.188 1885 11/6/2003
0.250 0 11/6/2003
Vlv
Cmnt
1 5015 3420 CAMCO KBUG
2 9155 5748 CAMCO KBUG
3 11243 6903 CAMCO KBUG
Other 'plugs, equip., etc.) - JEWELRY
Depth TVD Type
33 33 HANGER FMC 4.5" TBG HANGER
2305 1954 SSSV CAMCO TRM-4E SSSV
11331 6951 SLEEVE-C BAKER CMPA SLIDING SLEEVE W/2.81" 'X' PROFILE - CLOSED
7/9/2003
PACKER BAKER SAB-3 PACKER W/MILLOUT EXTENSION W/3.875" ID
NIP HES 'XN' NO GO NIPPLE
WLEG
1.0
1.0
1.0
Description
ID
4.500
2.812
2.810
3.875
2.750
3.875
11418 6997
11503 7041
11514 7046
Gênåral··...Nótês
Date Note
6/8/2003 MULTI-LATERAL WELL: THIS VIEW MAIN LEG
6/9/2003 TREE: FMC 4 1/16 5K
TREE CAP CONNECTION: 7" OTIS
)
')
Overview:
C02-58: A hydraulic fracture treatment will be performed in the open hole horizontal section to
establish communication vertically and longitudinally through the Alpine "C" sand. This will
increase the wells production rate and reserves. A coil cleanout will only be performed should it
be necessary post-frac.
Procedure:
1. MIRU seven clean insulated frac tanks with a berm surrounding the tanks that holds the tank
volume plus 10%. Load tanks with seawater from the injection system (approximately 2500
bbls are required for the treatment) ,_. ,. .. ..
2. Rig up Dowell equipment and stab Tree Saver. (Test tree saver seals to expected pressure
using warm diesel to assure seal integrity in tubing hanger).
3. Pressure test surface lines to 9500 psi
4. Pump the 100 bbl Breakdown with Dowell's YF125ST fluid system. Bring pumps up to
maximum rate ASAP.
5. Pump the following schedule at 30 BPM with a maximum pressure of 9000 psi, add breaker
as per lab results. Maintain 3000 psi on the IA during the treatment.
· 300 bbls YF125ST Pad
· 240 bbls YF125ST w/2 ppa 16/30 White Sand
· 480 bbls YF125ST w/4 ppa 16/30 White Sand
· 1000 bbls YF125ST w/7 ppa 16/30 White Sand
· Flush with linear YF125ST and freeze protect
Total Sand: -310,OOOlbs.
6. Monitor the surface pressure fall-off at the end of the job for 30 min (or until closure is
verified) if the well does not screen out.
7. Rig down equipment, (and prep for next well frac after evaluation by Engineering) move off
location.
FCC if required with slick diesel.
G{ J y( f Î À~ I;;, ~-
DATA SUBMITTAL COMPLIANCE REPORT
7/6/2005
Yfl'" d. ) 0:. ~ ./.\<J
API No. 50-103-20457-00-00
Permit to Drill 2030850
Well Name/No. COLVILLE RIV UNIT CD2-58
Operator CONOCOPHILLlPS ALASKA INC
MD
TVD 7191/
Completion Date 6/912003 /""'
Completion Status 1-01L
16389 /-
--------------
- ---- ._--~---
REQUIRED INFORMATION
Mud Log No
Samples No
- - --- -----
---~
DATA INFORMATION
Types Electric or Other Logs Run: GRlRes
Well Log Information:
Logl Electr
Data Digital Dataset
lype JÞd/Frmt Number Name
~-D-- Asc - --- ~ional SUNey
:--Rpt ^ LIS Verification
Log Log Run
Scale Media No
5
Rpt
. Rpt
1-EÓ
I
; Ef)'
Directional SUNey
Directional SUNey
11823.....ríS Verification
12597 --1nduction/Resistivity
5
o
C' Pdt
-- ------~-
Well Cores/Samples Information:
Name
Interval
Start Stop
Received
Sent
ADDITIONAL INFORMATION
Well Cored? Y 1fE)
Chips Received? . Y I N
Daily History Received?
Formation Tops
Analysis
Received?
~
- --- -- ---
------------
Comments:
--- --
- --------
Compliance Reviewed By:
~
Current Status 1-01L
UIC N
Directional SUNey Yes
(data taken from Logs Portion of Master Well Data Maint)
Interval OHI
Start Stop CH Received Comments
0 16389 2/3/2005 IIFR (Sag Corrected)
3031 16327 Open 6/25/2003
0 16389 Open 7/1/2003
0 16389 Open 7/1/2003 MWD
3031 16327 Open 6/25/2003
3065 16389 Open 4/23/2004 ROP, MWD, DGR, EWR
Sample
Set
Number Comments
&:iN
DIN
Date:
:> lL;~~ ~
)
AOGCC
Helen Warman
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
)
01-Feb-05
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-58(Sag Corrected)
Dear Dear Sir/Madam:
Enclosed is one disk with the *.PTT and *.PDF files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
16,389.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date "] F'u~ À1.ðb¡;- Signed
'.. ),,/ 1
Il! ¡
(~~,
()LJ
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
~ó ") - D g ')-
)
WELL LOG TRANSMITTAL
~c?.3 -()~ s
! ¿)r 7
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West ih Avenue, Suite 100
Anchorage, Alaska 99501-3539
April 20, 2004
RE: MWD Formation Evaluation Logs: CD2-58 & CD2-58 L 1,
AK-MW-2452746
CD2-58:
Digital Log Images:
50-103-20457 -00
1 CD Rom
CD2-58 Ll:
Digital Log Images:
50-103-20457 -60
1 CD Rom
PLEASE ACKN°OWLEDGE RECEIPT BY SIGNING AND RETURNIN°G THE ATTACHED
COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
Date: Yf~(of
RECEIVED
ÞPR 2 3 2004
Alaska Oil & Gas Cons. Commission
Anchorage
')
)
G. C. Alvord
Alpine Drilling Team Leader
Drilling & Wells
ConocJP'hillips
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6120
August 15, 2003
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Subject: Well Completion Report for C02-58 and CD2-58L 1 (APD 203-085/203-101)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Well Completion Reports for the
recent drilling operations on the Alpine wells C02-58 and CD2-58L 1.
If you have any questions regarding this matter, please contact me at 265-6120.
Sincerely,
A L. cY-.
G. C. Alvord
Alpine Drilling Team Leader
CPAI Drilling and Wells
GCA/skad
"' --
I"';
- '- n 'ì
î
STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Gas U
1 a. Well Status: Oil 0
GINJ 0
2. Operator Name:
WINJ 0
WDSPL 0
)
Plugged 0
Abandoned 0
20AAC 25.105
No. of Completions _
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360, Anchorage, AK 99510-0360
4a. Location of Well (Governmental Section):
Surface: 2143' FNL, 1493' FEL, Sec. 2, T11 N, R4E, UM
At Top Productive
Horizon: 339' FNL, 707' FWL, Sec.13, T11 N, R4E, UM
Total Depth:
4285'FNL,2464'FEL,Sec. 13, T11N, R4E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 371742 y-
TPI: x- 373800 y-
Total Depth: x- 375844 .I y-
18. Directional Survey: Yes 0 NoU
21. Logs Run:
GR/Res
22.
CASING SIZE
16"
9.625"
WT. PER FT.
62.5#
36#
26#
GRADE
H-40
J-55
L-80
7"
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
TOP BOTTOM
Surface 115'
Surface 3055'
Surface 12129'
5974214 .
5965423
5961443 I
Zone-4
Zone-4
Zone-4
23. Perforations open to Production (MD + TVD of Top and Bottom
Interval, Size and Number; if none, state "none"):
open hole completion from 12129' to 16389' .
26.
Date First Production
July 25, 2003
Date of Test Hours Tested
7/26/2003 6 hours
Flow Tubing Casing Pressure
press. 274 psi 1015
27.
Suspended D WAG 0
20AAC 25.110
Other
5. Date Comp., Susp.,
or Aband.: June 9, 2003
6. Date Spudded:
May 20, 2003
7. Date TD Reached:
June 5, 2003
8. KB Elevation (ft):
RKB 36.6' I 52.5' AMSL
9. Plug Back Depth (MD + TVD):
16389' MD /7191' TVD
10. Total Depth (MD + TVD):
16389' MD /7191' TVD
11. Depth where SSSV set:
SSSV @ 2305'
19. Water Depth, if Offshore:
N/A feet MSL
HOLE SIZE
1b. Well Class:
Development 0 Exploratory 0
Service D Stratigraphic Test 0
12. Permit to Drill Number:
I
203-085 I
13. API Number:
50-103-20457-00
14. Well Name and Number:
C02-58
/
15. Field/Pool(s):
Colville River Field
Alpine Oil Pool
16. Property Designation:
ADL 380075
17. Land Use Permit:
20. Thickness of
Permafrost:
1672' MD
42"
CEMENTING RECORD
AMOUNT PULLED
13 cu yds Portland Type III
490 sx AS III Lite & 233 sx Class G
185 sx Class G
12.25"
8.5"
24.
SIZE
4.5"
3.5"
TUBING RECORD
DEPTH SET (MD)
123'
11514'
PACKER SET (MD)
11418'
25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
N~ N~
CONTINUED ON REVERSE SIDE
AUG 1 9 100,3 (" ,;
Production for
Test Period -->
Calculated
24-Hour Rate ->
OIL-BBL GAS-MCF
600 571
OIL-BBL GAS-MCF
2157 2539
CORE DATA
W A TER-BBL
o
WATER-BBL
2
ORIGiNAL
Method of Operal
PRODUCTION TEST
Gas Lift Oil (production shared with CD2-58L 1 )
CHOKE SIZE
GAS-OIL RATIO
815
62%
OIL GRAVITY - API (corr)
not available
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if-necessary).
Submit core chips; if none, state "none". " -. _"; i
· I> ¿;'~,;1: ¡
· -..:_]:.~~ ¡
· ~'..' "'r",
ì .'-" ',,:. ,
· )
:-' ~~~ ~:. ..."-~-~~:~:.= j
Form 10-407 Revised 2/2003
\RBDMS BfL
NONE
Submit in duplicate
28.
)
29.
)
GEOLOGIC MARKERS
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested, and
attach detailed supporting data as necessary. If no tests were
conducted, state "None".
C02-58
Seabee Form.
Nanushuk
Gamma Ray Shale
Kalubik
Kuparuk Form.
Miluveach
Top Alpine 0
Top Alpine C
Alpine A
Base Alpine
TO
3091.5' 2399'
5799' 3831'
1 0999' 6742'
11361' 6936'
11437' 6976'
11512' 7013'
11825' 7142'
11906' & 16311' 7163' & 7201'
not available NIA
13941' & 14482' 7268' & 7258'
16389' 7191' ':: I
30. LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey
31, I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact:
Zane Kuenzler @ 265-1308
Printed Name
C. Alvord
Title:
Alpine Drilling Team Leader
l' '5 - (; I L¿1
Date
t31 œ·{Ó~
Signature A- -{ 0;0£...(
Phone
Prepared by Sharon Allsup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water
supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item
23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to
be separately produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other (explain).
Item 27: If no cores taken, indicate "none".
Item 29: list all test information. If none, state "None".
Form 10-407 Revised 2/2003
l.J~IGINAL
.)
)
ConocoPh'illips Alaska
Operations Summary Report
Page 1 of 8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C02-58
C02-58
ROT - DRILLING
doyon1 @ppco.com
Doyon 1 9
Start: 5/14/2003
Rig Release: 6/9/2003
Rig Number:
Spud Date: 5/21/2003
End:
Group:
5/19/2003 18:30 - 00:00 5.50 MOVE MOVE MOVE Move motor and pit complex. Jack rig floor into moving position. Raise
wind wall and feet and move rig from CD2-12 to CD2-58.
5/20/2003 00:00 - 03:30 3.50 MOVE MOVE MOVE Move rig fl CD2-12 to C02-58 - spot over well - move in pit & motor
complexes
03:30 - 04:30 1.00 MOVE RURD RIGUP Rig up service lines - air, steram, water, & electric
04:30 - 06:00 1.50 DRILL OTHR SURFAC Take on spud mud - NU riser - set mouse hole - Accept rig @ 0430
hrs.
06:00 - 09:00 3.00 DRILL PULD SURFAC PU 9 jts. 5" DP & 3 - 8" NM flex DC's - std back in derrick - PU MWD &
motor - MU motor - MWD & bit
09:00 - 10:00 1.00 DRILL OTHR SURFAC Up load MWD
10:00 - 10:30 0.50 DRILL OTHR SURFAC Cut riser & install dip pan to riser
10:30 - 11 :00 0.50 DRILL TRIP SURFAC RIH TO 115' - Fill conductor - check for leaks - test mud lines to 3500
psi
11 :00 - 11 :30 0.50 DRILL SFTY SURFAC Held pre spud meeting
11 :30 - 00:00 12.50 DRILL DRLG SURFAC Spud-in - Drill 12 1/4" hole f/115' to 1365' MD 1308' TVD ./
ADT - 6.6 hrs = ART 3.21 hrs. AST 3.39 hrs.
WOB 25/35 k RPM 60 (208 @ bit) GPM 550 @ 1530 psi
String wt. PU 125 SO 120 Rot 125
Torque onloff btm - 7500/5000 ftltbs
Took gyro surveys @ 170'
Kick off @ 280'
5/21/2003 00:00 - 12:00 12.00 DRILL DRLG SURFAC Drill 12 1/4" hole f/1365' to 2950' MD 2325' TVD
ADT 8.07 hrs. = ART 6.14 AST 1.93
WOB 35/40 k RPM 75 (245 @ bit) GPM 630 @ 2210 psi
String wt. PU 135 SO 120 ROT 135
Torque onloff btm. 8000/6000 Nibs
12:00 - 13:00 1.00 DRILL DRLG SURFAC Drill 12 1/4" hole f/2950' to 3058' MD 2381' TVD
ADT 1.06 hrs.
WOB 40/45k RPM 75 (245 @ bit) GPM 630 @ 2240 psi
String wt. PU 140 SO 125 ROT 135
Torque on/off btm. 8500/6000
13:00 - 14:30 1.50 DRILL CIRC SURFAC Pump sweep & circulate hole clean for wiper trip
630 gpm @ 1950 psi wI 75 RPM
Flow check - static
14:30 - 16:00 1.50 DRILL WIPR SURFAC Wiper trip fl 3058' to 1725' - tight hole f/1941' to 1725'
pulling 35 to 75 over - RIH to 1751'
16:00 - 16:30 0.50 DRILL CIRC SURFAC Circulate btms. up f/1751' 630 gpm @ 1800 psi wI 75 RPM
16:30 - 17:00 0.50 DRILL WIPR SURFAC Continue wiper trip f/1751' to 1275' - no excessive overe pull - hole
took proper fill - flow check - static
17:00 - 18:00 1.00 DRILL TRIP SURFAC RIH f/1275' to 2983'
18:00 - 20:00 2.00 DRILL CIRC SURFAC Break circulation - wash & ream f/2983' to 3058' - pumping sweep-
Circulate hole clean for trip
20:00 - 22:30 2.50 DRILL TRIP SURFAC POOH f/3058' to 989' (top of BHA) - Std back HWDP, jars, & NM flex
DC's - tight spots f/1225' to 989' 25k over
Hole took proper fill
22:30 - 00:00 1.50 DRILL PULD SURFAC Pull up & break bit, down load MWD - LD BHA
5/22/2003 00:00 - 00:30 0.50 DRILL PULD SURFAC Finish LD BHA
00:30 - 01 :00 0.50 DRILL OTHR SURFAC Clean rig floor
01 :00 - 02:00 1.00 CASE RURD SURFAC RU to run 9 5/8" casing - Held pre job safety meeting
02:00 - 03:00 1.00 CASE RUNC SURFAC Run 9 5/8" casing - FS - 2 jts. 9 5/8" 36# J-55 BTC - FC -
2 jts. 9 5/8" 36# J-55 BTC (BakerLoc first 4 connections - pump pipe
volume to check floats) 7 jts. 95/8" 36# J-55 BTC - 11 jts. total - Unable
to pump through Frank's fill up tool - pressured up to 950 psi
Printed: 6/23/2003 1 :39:20 PM
)
)
ConoboPhillips Alaska
Operations Summary Report
Page 2 of 8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C02-58
C02-58
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Start: 5/14/2003
Rig Release: 6/9/2003
Rig Number:
Spud Date: 5/21/2003
End:
Group:
5/22/2003 03:00 - 03:30 0.50 CASE OTHR SURFAC Change lower half of fill up tool
03:30 - 05:00 1.50 CASE RUNC SURFAC Continue running 9 5/8" csg - ran 11 jts (22 jts. total) 95/8" 36# J-55
BTC to 930' - had to spot wash fl 662' to 700' - took wt. @ 930'
05:00 - 05:30 0.50 CASE CIRC SURFAC Circ btms up
05:30 - 06:30 1.00 CASE RUNC SURFAC Continue running csg - Ran 9 jts.(31 jts. total) 9 5/8" 36# J-55 BTC
F/930'to 1265' - taking wt. had to wash down all 9 jts.- hit bridge @
1265'
06:30 - 07:30 1.00 CASE RUNC SURFAC Attempt to work casing through bridge - unable to work through - setting
down solid
07:30 - 13:30 6.00 CASE OTHR SURFAC RU to pull casing - pull & LD 31 jts. 95/8" 36# J-55 BTC casing
RD casing equipment - clean up rig floor - PU drilling bails & 5"
elevators
13:30 - 15:30 2.00 DRILL PULD SURFAC MU BHA - bit - motor - float sub - PDC - Stab - MWD - Orient MWD &
motor - NM flex DC's - test MWD @ 173'
15:30 - 16:30 1.00 DRILL TRIP SURFAC RIH f/173' to 1267' - tagged up on bridge - Wash & ream through
bridge f/1267' to 1270' - wash & ream f/1300' to 1330'
Continue RIH to 1743'
16:30 - 17:00 0.50 DRILL CIRC SURFAC Circulate btms up F/1743' 630 GPM @ 1850 psi 70 RPM
17:00 - 18:00 1.00 DRILL TRIP SURFAC Continue RIH f/1743' to 2984' - hole in good condition
18:00 - 18:30 0.50 DRILL REAM SURFAC Precautionary wash & ream fl 2984' to 3058' - Drill 7' new hole to 3065'
- rat hole for casing
18:30 - 19:30 1.00 DRILL CIRC SURFAC Pump hi vis sweep & circulate hole clean @ 630 GPM @ 2140 psi wI
75 RPM - flow check - static
19:30 - 22:00 2.50 DRILL TRIP SURFAC POOH f/3065' to 986' - hole in good condition - std back HWDP & jars
22:00 - 00:00 2.00 DRILL PULD SURFAC Std back NM flex DC's - LD MWD - motor - float sub - PDC - Stab
bit
5/23/2003 00:00 - 00:30 0.50 DRILL OTHR SURFAC Clean up rig floor - LD last of BHA componets
00:30 - 01 :30 1.00 CASE RURD SURFAC RU to run 9 5/8" csg - Held pre job safety meeting
01 :30 - 05:00 3.50 CASE RUNC SURFAC Run 9 5/8" 36# J-55 BTC casing as follows: FS, 2 jts., FC, 70 jts. (72
jts. total) - PU hanger & landing jt. - Land casing on landing ring wI FMC
fluted mandrel hanger wI shoe @ 3055' FC @ 2964' - Baker-Lac first 4
connections - Attached bow spring centralizers to first 12 jts.- then
every other jt. through # 70 - 41 total - run casing with no problems
* Note - Ran Davis Lynch bullet nose float shoe
05:00 - 06:00 1.00 CASE RURD SURFAC RD casing equipment & fill up tool - Blow dn top drive - RU cement
head
06:00 - 07:30 1.50 CEMENTCIRC SURFAC Circulate hole clean & condition mud for cement job - inital rate 4 bpm
@ 450 psi - final rate 7 bpm @ 320 psi - recripcating pipe 20' stroke -
PU wt. 145 SO wt. 125 - Held pre job meeting for cement job
07:30 - 10:00 2.50 CEMENT PUMP SURFAC Cement 9 5/8" casing as follows: Pumped 40 bbls. biozan water wI nut
plug - 6 bpm @ 200 psi wI rig pump - Switch to Dowell - Pumped 5 bbls
water - test cement lines to 2500 psi - Dropped btm plug - Mixed &
pumped 50 bbls Mudpush XL spacer @ 10.5 ppg - 5.7 bpm @ 470 psi -
Mixed & pumped lead slurry ( ASL "G" wI 30% 0-53, 0.6% 0046, 1.5%
0079,1.5% S001, 43.1% 0124, 9% BWOW 044, 0.5% 0-65) @ 10.7
ppg - 7 bpm @ 800 psi - Observed nut plug marker @ shakers wI 360
bbls lead pumped - cut off lead & pump down surge can - 374 bbls total
lead slurry pumped - switched to tail slurry ( "G" wI 0.2% 046, 0.3%
065, 2% S001) @ 15.8 ppg - 5.7 bpm @ 700 psi - Dropped top plug &
pumped 20 bbls water wI Dowell - Switch to rig pumps - Displaced wI
9.7 ppg mud @ 7 bpm 250 to 670 psi for first 195 bbls - slowed to 4
bpm @ 540 to 670 psi for last 14 bbls. - Bumped plug wI 780 psi - CIP
Printed: 6/23/2003 1 :39:20 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
)
)
Page 3 of 8
Conoc.oPhillips Alaska
Operations Summary Report
C02-58
CD2-58
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
H8Ú.rs:;.,,8?9§;¡~å~~·. .gh~~ß:
5/23/2003 07:30 - 10:00 2.50 CEMENT PUMP SURFAC
10:00 - 10:30 0.50 CEMENT OTHR SURFAC
10:30 - 11 :30 1.00 CEMENT PULD SURFAC
11 :30 - 13:00 1.50 WELCTL NUND SURFAC
13:00 - 14:00 1.00 WELCTL NUND SURFAC
14:00 - 16:00 2.00 WELCTL NUND SURFAC
16:00 - 20:30 4.50 WELCTL BOPE SURFAC
5/24/2003
20:30 - 21 :00
21 :00 - 22:30
22:30 - 00:00
00:00 - 05:00
0.50 DRILL
1.50 DRILL
1.50 DRILL
5.00 DRILL
OTHR SURFAC
PULD SURFAC
PULD SURFAC
PULD SURFAC
05:00 - 05:30 0.50 DRILL OTHR SURFAC
05:30 - 07:30 2.00 DRILL TRIP SURFAC
07:30 - 09:00 1.50 RIGMNT RSRV SURFAC
09:00 - 09:30 0.50 DRILL TRIP SURFAC
09:30 - 11 :30 2.00 CEMENT DSHO SURFAC
11 :30 - 12:30 1.00 DRILL CIRC SURFAC
12:30 - 13:00 0.50 DRILL FIT SURFAC
13:00 - 13:30 0.50 DRILL CIRC INTRM1
13:30 - 00:00 10.50 DRILL DRLG INTRM1
5/25/2003
00:00 - 12:00
12:00 - 14:00
14:00 - 15:30
12.00 DRILL
DRLG INTRM1
2.00 DRILL
DRLG INTRM1
1.50 DRILL
CIRC INTRM1
Start: 5/14/2003
Rig Release: 6/9/2003
Rig Number:
Spud Date: 5/21/2003
End:
Group:
@ 0950 hrs.
Full returns during job wI 120 bbls cement returns to surface -
recripcated pipe until start of tail slurry
Pressure up on casing fl 780 psi to 2500 psi & test casing for 30 mins.
OK - bleed off & check floats - floats held
RD cement head & LD landing jt. - Clean up rig floor
PJSM - NO riser, flow line, turnbuckles, & mouse hole - LD riser &
starting head (slip lock assembly)
Install FMC Unihead wellhead assembly - test seal to 1000 psi for 10
mins.
PJSM - NU BOPE - bell nipple, flowline, turnbuckles, service lines,
mouse hole, & drain lines
Test BOPE - Annular to 250 psi & 3500 psi - Pipe rams, blind rams,
choke & kill lines valves, choke manifold valves, TIW, dart valve,
manual & auto IBOP to 250 psi & 5000 psi - perform accumulator
closure test
AOGCC Chuck Scheve waived wittnessing of test
Pull test plug - install wear bushing
PU drilling bails & elevators - prep to PU 4" drill pipe
PJSM - PU 45 jts. 4" DP fl shed & std. back in derrick
PU BHA # 3 conponets - MU bit & Geo Pilot
PU 8 1/2" BHA - bit - Geo Pilot - NM PDC - NM Stab - LWD - NM Stab
- LWD H-cim - LWD OM Hoc - MWD MPT Pulser - unload MWD - Had
to change out LWD OM Hoc - Unload MWD - PU floats sub - NM Flex
DC's - MM Stab - HWDP - jars - HWDP - XO - Ghost reamer
Shallow test MWD & Geo Pilot
Continue RIH w/8 1/2" BHA to 2554' - PU remaining 4" DP fl shed & #2
ghost reamer
Slip & cut drill line - service TO
RI H fl 2554' to 2841' - Wash down fl 2841' to 2956' - tag top cmt.
Drill cmt. - wiper plugs - FC @ 2964' cmt. to top of FS @ 3053' Drill out
shoe to 3055' - clean out rat hole to 3065' - Drill 20' new hole to 3085'
MD 2395' TVD ADT - .25 hrs.
Circulate hole clean for FIT - 588 gpm wI 150 RPM
RU & perform F.I.T. to 16.0 ppg EMW wI 9.5 ppg mud w/810 psi
surface pressure - TVD shoe @ 2385' - RD
Change well over fl spud mud to 9.5 ppg LSND mud
Drill 8 1/2" hole wI Geo-Pilot f/3085' to 4467' MD 3118' TVD
ADT - 6.79 hrs
WOB - 10/12 k RPM 150 GPM 630 @ 2390 psi
String wt. PU 150 SO 115 ROT 130
Torque on/off btm. 9500/8500 ft/lbs.
Drill 8 1/2" hole wI Geo Pilot fl 4467' to 5612' MD 3727' TVD
ADT - 8.99 hrs
WOB - 5/10 k RPM 180 GPM 546 @ 2750 psi
String wt. PU 160 SO 120 Rot 135
Torque on/off btm. 9500/8000 ft/lbs.
Drill 8 1/2" hole wI Geo Pilot f/5612' to 5803' MD ADT - 1.52 hrs.
WOB 10/15 k RPM 180 GPM 630 @ 3550 psi
String wt. PU 165 SO 120 Rot 140
Torque on/off btm. 10000/9000 ftllbs.
Circ hi vis sweep & circulate hole clean for wiper trip -3X btms. up - 630
GPM 180 RPM 3380 psi - Std back 1 std every 15 mins. to 5516'
Printed: 6/23/2003 1 :39:20 PM
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C02-58
C02-58
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Start: 5/14/2003
Rig Release: 6/9/2003
Rig Number:
Spud Date: 5/21/2003
End:
Group:
. . .' .
. .........
HQÙrß:Øôq~
1.00 DRILL WIPR INTRM1 Monitor well (static) - POOH on trip tank f/5516' to 4658' (8 Stds.)-
improper fill on last 3 stds. - monitor well static - Pump out to 4658' -
1.00 DRILL CIRC INTRM1 Circulate btms up - 588 GPM @ 2760 psi wI 150 RPM - Obseverd all
three shakers running full wI large amount of hockey puck to softball
size clay balls - Circulate clean
Continue POOH on trip tank f/4658' to 3128' - hole took proper fill w/5
to 10 k drag
Pump out last std. & circulate btms. up - 588 GPM @ 2320 psi 150 rpm
- Observed large amount of cuttings @ shakers
Slip & cut drill line 120' (noticed bad spots in line while drilling) - Pull
cover and inspect top drive transmission ( hearing grinding noise while
rotating at low RPM's) change liners in mud pumps to 51/2" while
cutting line & inspecting TO
RIH f/3303' to 3993'
RIH f/ 3993' to 5707'
Break circ - precautionary wash & ream fl 5707' to 5803'
Circulate btms up
Drill 81/2" hole wI Geo Pilot f/5803' to 7045' MD 4556' TVD
ADT - 6.62 hrs.
WOB 10/15 k RPM 175 GPM 630 @ 3060 psi
String wt. PU 185 SO 125 Rot 150
12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole wI Geo Pilot f/7045' to 8681' MD - 5412' TVD
ADT - 7.4 hrs.
WOB 10/15 k RPM 170 GPM 630 @ 3070 psi
String wt. PU 230 SO 130 Rot 165
Torque on/off btm. 14500/13500 ftllbs.
1.50 DRILL DRLG INTRM1 Drill 8 1/2" hole wI GeoPilot f/8681' to 8860' MD 5559' TVD
ADT - .99 hrs
WOB 10/15K RPM 170 GPM 630 @ 3040 psi
String wt. PU 230 SO 130 Rot 165
Torque on/off btm - 14500/13500 ftllbs.
Pump Sweep & circulate hole clean for wiper trip 3X btms. up 630 gpm
@ 2900 psi wI 175 RPM - Std. back 7 stds. to 8191' while circulating (1
std every 15 mins.) - Flow check (static)
POOH on trip tank fl 8191' to 3033' - hole took proper fill W/5 to 10
average drag - 1 tight spot @ 6383' 20 k over
Circ btms up @ 3033' - 630 gpm @ 1880 psi - monitor well (static)
Monitor well on TT - Remove kelly hose - swivel packing - goose neck &
extension - bearing cap - inspect bearings - remove shimes to bring
bearing back into tolerance - reassembly top drive - change oil & filter -
test mud line to 2500 psi - Test TO - still making noise - Pull lower
inspection plate - inspect pinion gear & main bearing - found excess
play on btm bearing of drive shaft - reassemble
RIH f/3033' to 8769' (fill pipe every 20 stds)
Break circ - circulation btms up while wash & reaming fl 8769' to 8860' -
608 gpm @ 3050 psi wI 170 rpm
Drill 8 1/2" hole wI GeoPilot f/8860' to 9242' MD 5771' TVD
ADT - 1.88 hrs.
WOB 15/18K RPM 175 GPM 630 @ 3110 psi
String wt. PU 230 SO 135 Rot 168
Torque on/off btm. - 16000/15000 ft./lbs.
12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole wI GeoPilot f/9242' to 10769' MD 6619' TVD
5/25/2003
15:30 - 16:30
16:30 - 17:30
17:30 - 19:00 1.50 DRILL WIPR INTRM1
19:00 - 19:30 0.50 DRILL CIRC INTRM1
19:30 - 23:30 4.00 RIGMNT RSRV INTRM1
23:30 - 00:00 0.50 DRILL TRIP INTRM1
5/26/2003 00:00 - 01 :00 1.00 DRILL TRIP INTRM1
01 :00 - 02:00 1.00 DRILL REAM INTRM1
02:00 - 12:00 10.00 DRILL DRLG INTRM1
12:00 - 00:00
5/27/2003
00:00 - 01 :30
01 :30 - 04:00 2.50 DRILL CIRC INTRM1
04:00 - 08:00 4.00 DRILL WIPR INTRM1
08:00 - 08:30 0.50 DRILL CIRC INTRM1
08:30 - 17:30 9.00 RIGMNT RGRP INTRM1
17:30 - 20:00 2.50 DRILL TRIP INTRM1
20:00 - 21 :00 1.00 DRILL REAM INTRM1
21 :00 - 00:00 3.00 DRILL DRLG INTRM1
5/28/2003
00:00 - 12:00
Printed: 6/23/2003 1 :39:20 PM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C02-58
C02-58
ROT - DRILLING
doyon1 @ ppco.com
Doyon 19
Start: 5/14/2003
Rig Release: 6/9/2003
Rig Number:
Spud Date: 5/21/2003
End:
Group:
5/28/2003
12.00 DRILL DRLG INTRM1 ADT -7.59 hrs.
WOB 15/20 k RPM 170 GPM 630 @ 3470 psi
String wt. PU 260 SO 140 Rot 180
Torque on/off btm - 17000/15500 ft/lbs.
00:00 - 12:00
*Note - had minor losses @ 10,000' & 10,400'
12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole wi Geo Pilot f/10,769' to 12,147' MD TD-7197' TVD
ADT - 8.24 hrs.
WOB 15/20 RPM 165/170 GPM 600 @ 3550 psi
String wt. PU 280 SO 135 Rot 185
Torque on/off btm. - 18000/17000 ft/lbs.
* Note - Top of Alpine 7165' TVD - 43' TVD high to prog.
Circulate @ 12,147' TO - Prepare & pump lo/hi vis sweep - circulate
sweep out - Pump out f/12,147' to 11,181'
!70 RPM 600 GPM @ 3490 psi
Monitor well (static) - POOH f/11, 181' to 8826' on trip tank - Tight hole
f/11, 150' to 10,300' - pulling 30 to 40 k over
Hole took proper fill
RIH f/8826' to 12,147' - no problem RIH - fill pipe @ 10,800'
Circulate btms up - Pump out 1 std every 15 mins. to 11,151'
175 RPM 600 gpm @ 3410 psi - monitor well (static)
POOH on trip tank f/11,151' to 1891' - LD ghost reamer - Std. back 13
std. 4" DP - LD ghost reamer - std. back HWDP- jars - NM flex DC's
Handle BHA - LD bit, down load MWD - service Geo Pilot - RD Geo
Pilot manifold - LD - MWD - Geo pilot
Clear floor of tools - LD Geo pilot manifold
Pull wear bushing - set test plug - change top pipe rams f/3 1/2"x6"
VBR to 7" pipe ram - test to 250 psi & 5000 psi - pull test plug - set thin
wall wear bushing
RU to run 7" casing
Held pre job safety meeting - running casing
Run 7" 26# L-80 BTCM as follows: FS - 2 jts. - FC - 73 jts. to 3088' -
(Baker Loc 1 st four connections - pump through string on jt. #4 to check
floats) install straight blade centralizers to first 26 jts.
Circulate pipe volume @ 3088' - 5 1/2bbls/min @ 300 psi
PU wt. 135 SO wt 115
Continue running 7" casing - fl 3088' to 7393' (180 jts. total)
Circulate btms up 213 GPM @ 670 psi - PU wt. 215 SO wt. 135
Continue running 7" casing - f/7393' to 10,689' (260 jts. total)
Circulate btms up - 5112 BPM @ 800 psi PU wt 330 SO wt 150
Finish running 7" casing f/1 0,689' to 12093' (294 jts. total)
PU hanger & landing jt. - Land casing wI FMC fluted mandrel hanger in
wellhead wI shoe @ 12,129' FC @ 12,043'
SO wt 150 - Unable to break over PU wt. pulled 395 K
LD fill up tool
1.50 CASE CIRC INTRM1 MU cement head - Establish circ. 2.5 BPM @ 650 psi - final rate
6 bpm @ 810 psi -lower YP to < 20
Held pre job meeting while circulating
2.00 CEMENT PUMP INTRM1 Cement 7" casing as follows: Pumped 5 bbls CW-100 - Test cement
lines to 3500 psi - Pumped 15 bbls CW-100 - Pumped 50 bbls Mud
PushXL @ 12.5 ppg @ 4.5 bbls/min. - Dropped btm plug - Mixed &
pumped 38 bbls slurry ( G wI 046 0.2%, D65 0.3%, S001 2%) @ 15.8
12:00 - 00:00
5/29/2003 00:00 - 04:30 4.50 DRILL CIRC INTRM1
04:30 - 08:00 3.50 DRILL WIPR INTRM1
08:00 - 09:30 1.50 DRILL TRIP INTRM1
09:30 - 13:00 3.50 DRILL TRIP INTRM1
13:00 - 21 :00 8.00 DRILL TRIP INTRM1
21 :00 - 00:00 3.00 DRILL PULD INTRM1
5/30/2003 00:00 - 00:30 0.50 DRILL PULD INTRM1
00:30 - 03:30 3.00 DRILL OTHR INTRM1
03:30 - 04:15 0.75 CASE NUND INTRM1
04:15 - 04:30 0.25 CASE SFTY INTRM1
04:30 - 07:30 3.00 CASE RUNC INTRM1
07:30 - 08:00 0.50 CASE CIRC INTRM1
08:00 - 11 :30 3.50 CASE RUNC INTRM1
11 :30 - 12:00 0.50 CASE CIRC INTRM1
12:00 - 15:00 3.00 CASE RUNC INTRM1
15:00 - 16:00 1.00 CASE CIRC INTRM1
16:00 - 17:30 1.50 CASE RUNC INTRM1
17:30 - 19:00
19:00 - 21 :00
Printed: 6/23/2003 1 :39:20 PM
)
')
. .. .... : ."", .:.
..·H··········· '. · ····0······ d····· ... .·$Üþ; .··.·p·.·.....·h·.·.·..·.·.·.a·.··.····s·.···.:..e·.··.·.····.·.··....
.. ..... oUrs ·...····QØ ...·'Odd&·.
2.00 CEMENT PUMP INTRM1 ppg @ 5 bbls/min
Dropped top plug wI 20 bbls water fl Dowell - switched to rig pumps &
displaced wI 9.8 ppg mud @ 7 bbls/min @ 740 psi to 930 psi for first
412 bbls of dispalcement - slowed pumps to 4 bbls/min @ 640 to 800
psi for remaining displacement 30.7 bbls - total displacment 462.7 bbls
- calc. 461.3 bbls. - Did not bump plug - CIP @ 2100 hrs. - Full returns
during job
Check floats - slight flow back fl casing - LD cmt head - Install
circulating swedge - pressure up on casing to 450 psi - shut in -
observed flow from annulus - shut pipe rams
Monitor well - LD casing equip - clean up rig floor
Well shut in - WOC
Open HCR no pressure on annulus - bleed off casing presssure - open
pipe rams - RU circ. swedge & line - LD landing jt.
Pull thin wall WB - set 7 test pack-off to 5000 psi for 10 mins.
Change top pipe rams f/7" to 3 1/2" x 6" VBR - RU & test BOPE - Hydril
to 250 & 3500 psi - pipe rams, blind rams, kill & choke line valves,
choke manifold valves, auto & manuallBOP, dart & TIW valves to 250
& 5000 psi - perform accumulator closure test
Wittnessing of test waived by Jeff Jones AOGCC - RD test equipment
Cleaning pits for OBM - Repair top drive - remove drive shaft, upper
pinion bearing & seals - replace bearing & seals - replace drie shaft - fill
wI oil - test run OK
PU drilling baile & 4" elevators
PU & MU 6 1/8" BHA - Bit, motor, AGS MWD - up load MWD - RIH wI
NM flex DC's - HWDP , jars fl derrick to 370'
RIH w/6 1/8" BHA - PU 4" drill pipe fl pipe shed to 848' (shallow test
tools @ 400')
Continue RIH w/6 1/8" BHA f/848' to 4858' - picking up 4" DP fl shed-
RIH wI stds. fl derrick f/4858' to 9900' (fill pipe every 200')
PJSM - Slip & cut drill line 90'
Continue RIH f/9900' to 11,730'
Wash & ream f/11 ,730' to 11 ,958'(top of cmt.) 220 gpm @ 1680 psi -
50 RPM
PUW 290 SOW 130 ROT 180
Torque onloff btm. 17000/17000
Circulate btms. up for casing test 220 gpm 1680 psi
RU & test 7" casing to 3500 psi for 30 mins. - RD
Clean out cmt - wiper plugs - FC @ 12,044' - cmt. to FS - Drill out FS @
12,127' to 12,129' - clean out rat hole to 12,147' - drill 15' new hole to
12,162'
Circulate hole clean for F.I.T.
RU & perform F.I.T. to 12.5 ppg EMW @ 7" shoe 12,129'
wI 9.8 ppg mud w/1 01 0 psi surface pressure - RD - Blow down all lines
PJSM - Mix spacer - Displace well to 8.5 ppg OBM - Monitor well while
cleaning surface equip. in pits (static)
Drill61/8A horizontal section f/12,162' to 12,636' MD 7196' TVD
ADT - 5.47 hrs = ART - 3.99 AST - 1.48 hrs
WOB 5/10 k RPM 70 GPM 241 @ 3670 psi
String wt. PU 225 SO 130 Rot. - 170
Torque onloff btm. 13000/12000 ft./lbs.
12.00 DRILL DRLH PROD Drill 6 1/8" horizontal section f/12,636' to 13,402' MD 7239' TVD
WOB - 6/10 k RPM - 0/80 GPM - 240 @ 3500 psi
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C02-58
C02-58
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
5/30/2003
19:00 - 21 :00
21 :00 - 21 :30 0.50 CEMENT PULD INTRM1
21 :30 - 00:00 2.50 CEMENTOTHR INTRM1
5/31/2003 00:00 - 02:00 2.00 DRILL OBSV INTRM1
02:00 - 02:30 0.50 DRILL OTHR INTRM1
02:30 - 03:30 1.00 DRILL OTHR INTRM1
03:30 - 11 :00 7.50 WELCTL BOPE INTRM1
11 :00 - 19:30 8.50 RIGMNT RGRP INTRM1
19:30 - 20:00 0.50 DRILL OTHR INTRM1
20:00 - 23:00 3.00 DRILL PULD INTRM1
23:00 - 00:00 1.00 DRILL TRIP INTRM1
6/1/2003 00:00 - 05:30 5.50 DRILL TRIP INTRM1
05:30 - 06:30 1.00 RIGMNT RSRV INTRM1
06:30 - 07:30 1.00 DRILL TRIP INTRM1
07:30 - 08: 15 0.75 DRILL REAM INTRM1
08:15 - 09:15 1.00 DRILL CIRC INTRM1
09:15 - 10:15 1.00 DRILL OTHR INTRM1
10:15 - 12:15 2.00 CEMENT DSHO INTRM1
12:15 - 13:00 0.75 DRILL CIRC INTRM1
13:00 - 14:00 1.00 DRILL FIT INTRM1
14:00 - 16:00 2.00 DRILL CIRC PROD
16:00 - 00:00 8.00 DRILL DRLH PROD
61212003
00:00 - 12:00
Start: 5/14/2003
Rig Release: 6/9/2003
Rig Number:
Spud Date: 5/21/2003
End:
Group:
Printed: 6/23/2003 1 :39:20 PM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C02-58
C02-58
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
·..HQÙr~rG,øde ....8òu¡~·. .·.F?hªsØ::
6/2/2003
00:00 - 12:00
12.00 DRILL DRLH PROD
12:00 - 00:00
12.00 DRILL DRLH PROD
6/3/2003
00:00 - 14:00 14.00 DRILL DRLH PROD
14:00 - 14:30 0.50 DRILL OTHR PROD
14:30 - 18:30 4.00 DRILL TRIP PROD
18:30 - 00:00 5.50 DRILL TRIP PROD
00:00 - 02:00 2.00 DRILL TRIP PROD
02:00 - 03:30 1.50 DRILL PULD PROD
03:30 - 06:00 2.50 DRILL PULD PROD
06:00 - 06: 15 0.25 DRILL TRIP PROD
06:15 - 14:00 7.75 DRILL TRIP PROD
14:00 - 14:30 0.50 DRILL REAM PROD
14:30 - 00:00 9.50 DRILL DRLH PROD
00:00 - 17:30 17.50 DRILL DRLH PROD
6/4/2003
6/5/2003
17:30 - 21 :00 3.50 DRILL CIRC PROD
21 :00 - 00:00 3.00 DRILL TRIP PROD
6/6/2003 00:00 - 03:00 3.00 DRILL TRIP PROD
03:00 - 03:15 0.25 DRILL CIRC PROD
03: 15 - 04:45 1.50 DRILL OTHR PROD
04:45 - 09:00 4.25 DRILL DRLH PROD
09:00 - 00:00 15.00 DRILL DRLH PROD
61712003 00:00 - 07:30 7.50 DRILL DRLH PROD
07:30 - 09: 15 1.75 DRILL CIRC PROD
09:15 - 09:30 0.25 DRILL OBSV PROD
09:30 - 11 :00 1.50 DRILL CIRC PROD
11 :00 - 13:00 2.00 DRILL TRIP PROD
13:00 - 13:15 0.25 DRILL OBSV PROD
13:15 - 14:00 0.75 RIGMNT RSRV PROD
14:00 - 15:15 1.25 DRILL CIRC PROD
15:15 - 00:00 8.75 DRILL TRIP PROD
6/8/2003 00:00 - 01 :00 1.00 DRILL TRIP PROD
01 :00 - 02:30 1.50 DRILL TRIP PROD
02:30 - 03:00 0.50 DRILL TRIP PROD
03:00 - 04: 15 1.25 DRILL PULD PROD
Start: 5/14/2003
Rig Release: 6/9/2003
Rig Number:
Spud Date: 5/21/2003
End:
Group:
String wt. PU 225 SO 130 Rot 175
Torque on/off btm. 14,500/13,000 ftIlbs.
ADT - 7.31 hrs. = ART - 5.91 hrs. AST - 1.40 hrs.
Drill 6 1/8" horizontal section f/13 402' to 14,118' MD 7265 TVD
WOB - 10/12 RPM - 0/60 GPM - 239 @ 3400 psi
String wt. PU 245 So 125 Rot. 170
Torque on/off btm. 17,000/16,000 ftIlbs.
ADT - 8.08 hrs. = ART - 7.84 hrs. AST - .24
* Note - drilled into base @ 13,937' MD
Drill horizontal section from 14118' to 14866'. TVD= 7236'. ART=4.99,
AST =3.17, ADT =8.16. Rotary= 0/80, WOB= 8/12, 67 spm @ 3450 psi.
Drill string plugged. Attempted to unplug wlo success
POOH wet from 14866' to 12117'
POOH from 12117' to 3797'
POOH. Standback HWDP and D.C's
Break bit, download MWD. Pull probe, check float, AGS plugged, UD
AGS
M/U AGS, install float, M/U probe, upload MWD, M/U bit, adjust motor
and orient
RIH wI d.c.'s and HWDP. Shallow test MWD-OK
RIH from 365' to 14791'
Wash and ream from 14791' to 14866'.
Drill horizontal section from 14866' to 15394'. TVD=7246'. ART=5.04,
AST =1.09, ADt=6.13, rotary=60 rpm, WOB=5/10, Pump pressure=3620
psi @ 67 spm, 240 gpm
Drilled from 15394' to 16389'. TVD=7190'. ART=8.54, AST=1.42, V'
ADT =9.96, PU=245k, SO=115, Rot=170, torque=16000/15000 on/off,
rotary=50 rpm, WOB=8/12, 3640 psi @ 67 spm
Circulate sweep and bottoms up 3x
Pump out of hole from 16389' to 14100'
Pump out of hole from 14100' to 12175'
Establish circulation and orient motor
Trench low side of hole for sidetrack
Time drill from 12200' to 12210'
Drill horizontal section from 12210' to 13068', TVD=7233', ART=9.16,
AST =.88, ADT =10.04, PU=235k, SO=130k, Rot=175k, torque=15.8 onl
15.1 off. Rotary = 60 rpm, wob=8/12, Pump=3350 psi @ 67 spm
Drill from 13068' to 13550'. ART=3.49, AST=.3, ADT=3.79 PU=230,
SO=130, Rot=173, Torque=14500/13500 on/off. Rotary=0/60 rpm,
WOB=8/12, Pump = 3450 psi @ 67 spm
Circ sweep and BU 2x,
Flow and tried to pull pipe wlo pump wlo success
CBU
Pump out of hole from 13550' to 12215'
Flow check
Cut 90' drilling line
Circ casing clean
Pump out of the hole from 12215' to 4667'
Pump out from 4667' to 3160'
Check flow and POOH on trip tank to HWDP
POOH wI HWDP and NMDC's
UD bit, adjust motor, UD BHA
Printed: 6/23/2003 1 :39:20 PM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
"Frc3m'...to·
C02-58
C02-58
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
. . ..c . ..' '.' .·S···.·b~. .
Hpu....·..r. S. i·.··... ¡GA. 9~¡. ·66~~);.··.··.
. .... ." . ."
... . . .. . . ... . . .. ,. . .
Start: 5/14/2003
Rig Release: 6/9/2003
Rig Number:
Spud Date: 5/21/2003
End:
Group:
Rþåê.ß·: '.
.' . '.. ..' . . .. .. "'.. ..
. .' ·······¡····..·.·;·i.;..·.·.·:.~..~·§qriþ~iøh··.·.d.f;¡·9p~.r~~ipr§...·:.·.···.··
6/8/2003 04:15 - 04:30 0.25 CMPL TN OTHR CMPL TN Pull wear ring
04:30 - 05:00 0.50 CMPL TN OTHR CMPLTN Clean rig floor
05:00 - 06:00 1.00 CMPL TN OTHR CMPL TN R/U tubing tongs, slips, elevators for 3-1/2" tubing
06:00 - 18:45 12.75 CMPLTN RUNT CMPL TN Run 3-1/2" completion string
18:45 - 20:00 1.25 CMPL TN RUNT CMPL TN Change tongs and handling tools to 4-1/2" tubing and P/U 2 jts 4-1/2"
tubing, M/U hanger and control line. Test to 5000 psi
20:00 - 21 :00 1.00 CMPL TN NUND CMPL TN Landing tubing. RILDS, Set 2-way check and test 2-way check and
hanger seals to 5000 psi
21 :00 - 22:30 1.50 CMPL TN OTHR CMPL TN M/U stack flusher, flush BOPE. Flush mud pumps and all lines wI hot
water. Blow down lines and top drive. Wash drip pans and vacuum
BOP stack
22:30 - 00:00 1.50 CMPL TN NUND CMPL TN NIO BOPE and set back. C/O saver sub on topdrive. R/U
displacement manifold
6/9/2003 00:00 - 01 :00 1.00 CMPL TN NUND CMPL TN N/U tree and test to 5000 psi
01 :00 - 01 :30 0.50 CMPL TN OTHR CMPL TN Pull 2-way check and drop ball rod. RID lubricator
01 :30 - 02:00 0.50 CMPL TN OTHR CMPL TN R/U circulating line to test manifold
02:00 - 02:15 0.25 CMPL TN SFTY CMPL TN Safety meeting on setting packer, testing tubing and displacing
02:15 - 03:00 0.75 CMPL TN OTHR CMPL TN Fill lines wi mineral and test to 3600 psi
03:00 - 03:45 0.75 CMPL TN DEOT CMPL TN Set packer and test tubing to 3500 psi for 30 min.-OK
03:45 - 04:30 0.75 CMPL TN DEOT CMPL TN Test annulus to 3500 psi for 30 min wI 3500 psi on tubing-OK
04:30 - 05:00 0.50 CMPL TN OTHR CMPL TN Shear sliding sleeve open. Took several attempts. Had to retest lines
to 4000 psi and then sleeve sheared at 3700 psi.
05:00 - 06:30 1.50 CMPL TN FRZP CMPL TN Dowell displaced tubing and annulus wI 40 bbl mineral oil followed by
375 bbl diesel
06:30 - 08:15 1.75 CMPL TN OTHR CMPL TN Vacuumed out lines and RID circulating manifold
08:15 - 16:00 7.75 CMPLTN OTHR CMPL TN UO excess 4" d.p. from derrrick
16:00 - 18:30 2.50 MOVE OTHR DEMOB Cleaning OBM out of drip pans on rig floor
18:30 - 20:00 1.50 MOVE OTHR DEMOB Blow down boiler and water lines while ball mill finishes injecting.
v
,/
Rig released at 20:00 hrs 6/9/03
Printed: 6/23/2003 1 :39:20 PM
ConocoPhillips Alaska, Inc. CD2-58 (Final Surveys) Main Wel
MD Inc Azim. SSTVD TVD N/S X
(ft) (Deg) (Deg) (ft) (ft)
0 0 0 -52.49 0 ON OE 5974214 N 371741.6 E
107.89 0.41 156.35 55.399 1 07.889 0.354 S 0.155 E 5974214 N 371741.7 E
196.42 0.74 156.35 143.924 196.414 1 .167 S 0.511 E 5974213 N 371742.1 E
289.45 2.62 164.68 236.91 289.4 3.769 S 1.314 E 5974210 N 371742.8 E
379.68 5.78 170.63 326.887 379.377 10.242 S 2.599 E 5974204 N 371744 E ~-
470.4 8.35 168.69 416.911 469.401 21.211 S 4.635 E 5974193 N 371745.9 E
559.79 10.69 163.77 505.065 557.555 35.538 S 8.226 E 5974179 N 371749.2 E
648.28 11.78 164.16 591.858 644.348 52.108 S 12.985 E 5974162 N 371753.7 E
738.63 12.32 163.82 680.217 732.707 70.238 S 18.189 E 5974144 N 371758.6 E
828.5 13.84 164.25 767.753 820.243 89.793 S 23.778 E 5974124 N 371763.8 E
918.49 14.89 166.04 854.928 907.418 111.373 S 29.489 E 5974102 N 371769.2 E
1013.22 18.57 167.8 945.634 998.124 137.937 S 35.615 E 5974076 N 371774.9 E
1108.03 25.01 164.35 1033.627 1086.117 172.029 S 44.222 E 5974041 N 371782.9 E
1203.23 29.63 163.71 1118.185 1170.675 214.019 S 56.258 E 5973999 N 371794.2 E
1299.28 32.16 164.26 1200.6 1253.09 261.421 S 69.855 E 5973952 N 371807 E
1394.79 34.33 166.03 1280.475 1332.965 312.03 S 83.254 E 5973901 N 371819.5 E
1489.78 38.03 167.02 1357.136 1409.626 366.555 S 96.297 E 5973846 N 371831.6 E
1585.1 40.68 167.25 1430.833 1483.323 425.478 S 109.751 E 5973787 N 371844.1 E
1680.39 43.04 167.27 1501.798 1554.288 487.496 S 123.772 E 5973725 N 371857 E
1775.02 46.86 167.83 1568.758 1621.248 552.769 S 138.172 E 5973659 N 371870.3 E
1869.72 49.45 167.34 1631.929 1684.419 621.659 S 153.344 E 5973590 N 371884.3 E --
1964.92 50.59 167.28 1693.096 1745.586 692.824 S 169.369 E 5973519 N 371899.1 E
2059.96 52.98 164.99 1751.889 1804.379 765.301 S 187.283 E 5973446 N 371915.8 E
2154.98 53.88 165.74 1808.503 1860.993 839.138 S 206.561 E 5973372 N 371933.8 E
2250.3 54.37 165.16 1864.362 1916.852 913.897 S 225.966 E 5973297 N 371951.9 E
2345.56 54.18 166.25 1919.985 1972.475 988.835 S 245.062 E 5973221 N 371969.7 E
2440.98 54.47 166.43 1975.633 2028.123 1064.156 S 263.367 E 5973146 N 371986.7 E
2536.23 54.69 166.52 2030.836 2083.326 1139.625 S 281.52 E 5973070 N 372003.6 E
2631.65 54.78 167.93 2085.93 2138.42 1215.603 S 298.747 E 5972994 N 372019.5 E
2726.9 54.09 165.76 2141.334 2193.824 1291.045 S 316.372 E 5972918 N 372035.8 E
2821.8 54.07 164.19 2197.01 2249.5 1365.267 S 336.295 E 5972843 N 372054.5 E
2916.61 56.17 164.47 2251.225 2303.715 1440.15 S 357.299 E 5972768 N 372074.2 E
2990.56 56.88 165.21 2292.014 2344.504 1499.686 S 373.428 E 5972708 N 372089.3 E
3060.6 57.2 164.48 2330.119 2382.609 1556.409 S 388.792 E 5972651 N 372103.7 E
3156.36 57.84 164.31 2381.543 2434.033 1634.212 S 410.523 E 5972573 N 372124.1 E
3252.13 58.29 164.53 2432.201 2484.691 1712.5 S 432.352 E 5972495 N 372144.6 E
3347.95 58.67 164.25 2482.295 2534.785 1791.17 S 454.332 E 5972416 N 372165.2 E
3443.68 58.65 164.59 2532.086 2584.576 1869.928 S 476.292 E 5972336 N 372185.8 E
3539.48 58.45 164.7 2582.07 2634.56 1948.737 S 497.933 E 5972257 N 372206.1 E
3635.36 58.66 164.89 2632.089 2684.579 2027.673 S 519.386 E 5972178 N 372226.2 E
3730.87 58.54 165.93 2681.851 2734.341 2106.565 S 539.922 E 5972099 N 372245.4 E
3826.29 58.71 165.46 2731.531 2784.021 2185.506 S 560.052 E 5972019 N 372264.2 E
3921.3 58.43 165.07 2781.074 2833.564 2263.909 S 580.671 E 5971941 N 372283.5 E -
4017.09 58.72 165.83 2831.018 2883.508 2343.027 S 601.205 E 5971861 N 372302.6 E
4112.35 58.35 166.54 2880.742 2933.232 2421.928 S 620.608 E 5971782 N 372320.7 E
4207.88 58.71 167.16 2930.614 2983.104 2501.27 S 639.144 E 5971702 N 372337.9 E
4303.68 59.66 166.82 2979.689 3032.179 2581 .432 S 657.666 E 5971622 N 372355 E
4397.31 57.71 166.58 3028.35 3080.84 2659.273 S 676.066 E 5971544 N 372372.1 E
4492.39 57.4 166.56 3079.359 3131.849 2737.318 S 694.702 E 5971465 N 372389.4 E
4586.99 58.29 167.23 3129.706 3182.196 2815.32 S 712.858 E 5971387 N 372406.2 E
4683.34 58.51 166.73 3180.193 3232.683 2895.274 S 731.347 E 5971307 N 372423.3 E
4780.4 58.64 167.91 3230.799 3283.289 2976.076 S 749.526 E 5971226 N 372440.1 E
4876.06 58.85 167.7 3280.432 3332.922 3056.007 S 766.8 E 5971146 N 372456 E
4971.84 58.86 166.41 3329.972 3382.462 3135.895 S 785.163 E 5971065 N 372473 E
5066.86 57.57 165.68 3380.021 3432.511 3214.279 S 804.638 E 5970987 N 372491.1 E
5163.07 57.72 165 3431.51 3484 3292.906 S 825.207 E 5970908 N 372510.4 E
5258.72 56.82 164.55 3483.226 3535.716 3370.545 S 846.336 E 5970830 N 372530.2 E
5354.32 56.9 164.56 3535.489 3587.979 3447.703 S 867.654 E 5970752 N 372550.2 E
5448.06 57.28 164.53 3586.42 3638.91 3523.554 S 888.625 E 5970676 N 372569.8 E ",-,,'
5545.81 56.95 162.84 3639.496 3691.986 3602.332 S 911.681 E 5970597 N 372591.5 E
5640.8 57.85 162.36 3690.674 3743.164 3678.693 S 935.613 E 5970520 N 372614.2 E
5735.11 55.93 160.83 3742.19 3794.68 3753.645 S 960.541 E 5970445 N 372637.8 E
5828.11 54.64 163.52 3795.159 3847.649 3826.404 S 983.951 E 5970372 N 372660 E
5925.26 54.26 164.71 3851.644 3904.134 3902.424 S 1005.587 E 5970295 N 372680.3 E
6022.08 54.07 166.01 3908.329 3960.819 3978.366 S 1025.426 E 5970219 N 372698.8 E
6116.31 54.02 165.51 3963.657 4016.147 4052.299 S 1044.189 E 5970145 N 372716.3 E
6213.53 54.51 164.95 4020.437 4072.927 4128.606 S 1064.308 E 5970068 N 372735.1 E
6308.4 54.75 164.97 4075.353 4127.843 4203.316 S 1084.383 E 5969993 N 372753.9 E
6403.27 54.29 166.01 4130.418 4182.908 4278.104 S 1103.74 E 5969918 N 372772 E
6498.01 53.98 165.99 4185.924 4238.414 4352.6 S 1122.314 E 5969843 N 372789.3 E
6594.87 54.13 167.04 4242.783 4295.273 4428.853 S 1140.599 E 5969766 N 372806.3 E
6688.04 54.18 167.41 4297.343 4349.833 4502.507 S 1157.299 E 5969693 N 372821.7 E
6786.25 54.43 168.08 4354.646 4407.136 4580.449 S 1174.228 E 5969614 N 372837.3 E
6881.77 54.79 168.72 4409.965 4462.455 4656.728 S 1189.885 E 5969538 N 372851.7 E
6977.23 55.05 168.53 4464.828 4517.318 4733.313 S 1205.293 E 5969461 N 372865.8 E
7072.72 55.63 168.6 4519.133 4571.623 4810.298 S 1220.865 E 5969384 N 372880 E
7168.28 56.02 168.07 4572.812 4625.302 4887.724 S 1236.85 E 5969306 N 372894.7 E
7263.9 56.17 168.32 4626.15 4678.64 4965.407 S 1253.086 E 5969228 N 372909.6 E
7359.58 55.84 168.75 4679.647 4732.137 5043.15 S 1268.854 E 5969150 N 372924 E
7455.28 55.8 167.33 4733.413 4785.903 5120.599 S 1285.26 E 5969072 N 372939.1 E ~/
7550.84 56.11 167.05 4786.911 4839.401 5197.808 S 1302.816 E 5968995 N 372955.3 E
7646.35 56.31 167.49 4840.029 4892.519 5275.234 S 1320.306 E 5968917 N 372971.5 E
7742.18 56.85 167.31 4892.81 4945.3 5353.292 S 1337.755 E 5968839 N 372987.6 E
7837.35 57.03 167.17 4944.727 4997.217 5431.084 S 1355.372 E 5968761 N 373003.9 E
7933.13 57.72 166.5 4996.365 5048.855 5509.63 S 1373.746 E 5968682 N 373020.9 E
8028.61 58.23 166.41 5046.997 5099.487 5588.328 S 1392.705 E 5968603 N 373038.5 E
8124.34 57.93 165.03 5097.615 5150.105 5667.069 S 1412.745 E 5968524 N 373057.2 E
8219.79 57.26 164.63 5148.766 5201.256 5744.847 S 1433.832 E 5968446 N 373077 E
8315.4 56.74 163.4 5200.84 5253.33 5821.93 S 1455.911 E 5968368 N 373097.7 E
8410.68 56.45 162.79 5253.297 5305.787 5898.032 S 1479.039 E 5968292 N 373119.5 E
8505.61 55.82 163.41 5306.196 5358.686 5973.452 S 1501.955 E 5968216 N 373141.2 E
8601.2 55.79 163.95 5359.919 5412.409 6049.331 S 1524.172 E 5968140 N 373162.1 E
8695.17 55.59 164.44 5412.887 5465.377 6124.015 S 1545.313 E 5968065 N 373181.9 E
8790.51 55.57 165.87 5466.781 5519.271 6200.034 S 1565.462 E 5967988 N 373200.8 E
8887.96 56.17 165.94 5521 .457 5573.947 6278.271 S 1585.107 E 5967910 N 373219.1 E
8983.39 56.22 166.92 5574.552 5627.042 6355.352 S 1603.712 E 5967832 N 373236.4 E -~
9078.98 56.11 168.15 5627.778 5680.268 6432.879 S 1620.85 E 5967755 N 373252.2 E
9173.08 56.26 167.55 5680.146 5732.636 6509.309 S 1637.305 E 5967678 N 373267.3 E
9266.15 57.19 167.45 5731.21 5783.7 6585.275 S 1654.147 E 5967602 N 373282.9 E
9365.59 57.26 167.34 5785.04 5837.53 6666.869 S 1672.393 E 5967520 N 373299.7 E
9458.69 57.04 166.71 5835.542 5888.032 6743.084 S 1689.953 E 5967443 N 373316 E
9556.89 57.19 166.17 5888.861 5941.351 6823.25 S 1709.288 E 5967363 N 373333.9 E
9645.38 57.21 165.74 5936.796 5989.286 6895.408 S 1727.339 E 5967290 N 373350.7 E
9743.16 56.68 165.21 5990.13 6042.62 6974.742 S 1747.892 E 5967211 N 373369.9 E
9843.38 56.02 164.87 6045.664 6098.154 7055.341 S 1769.427 E 5967130 N 373390.1 E
9936.71 55.54 164.09 6098.15 6150.64 7129.699 S 1790.075 E 5967055 N 373409.5 E
10033.56 55.18 164.1 6153.201 6205.691 7206.331 S 1811.912 E 5966978 N 373430 E
10127.07 55.13 165.15 6206.63 6259.12 7280.326 S 1832.259 E 5966904 N 373449.1 E
10220.01 55.73 165.21 6259.365 6311.855 7354.31 S 1851.834 E 5966829 N 373467.4 E
10319.06 55.57 166.77 6315.256 6367.746 7433.65 S 1871.631 E 5966750 N 373485.8 E
10401.48 55.66 166.12 6361.803 6414.293 7499.772 S 1887.573 E 5966683 N 373500.6 E
10510.87 56.38 166.26 6422.941 6475.431 7587.859 S 1909.225 E 5966595 N 373520.8 E
10605.74 56.23 167.6 6475.574 6528.064 7664.744 S 1927.075 E 5966518 N 373537.3 E
10701.87 56.76 168.81 6528.64 6581 .13 7743.206 S 1943.457 E 5966439 N 373552.3 E
10797.1 57.57 168.51 6580.275 6632.765 7821.658 S 1959.191 E 5966360 N 373566.7 E
10892.52 57.19 167.91 6631.713 6684.203 7900.331 S 1975.611 E 5966281 N 373581.8 E
10987.93 57.5 167.39 6683.195 6735.685 7978.801 S 1992.793 E 5966202 N 373597.6 E -
11083.45 57.7 167.26 6734.377 6786.867 8057.485 S 2010.489 E 5966123 N 373614 E
11179.05 57.73 167.12 6785.44 6837.93 8136.294 S 2028.409 E 5966044 N 373630.5 E
11274.57 57.64 166.24 6836.503 6888.993 8214.847 S 2047.007 E 5965966 N 373647.8 E
11370 57.12 165.59 6887.946 6940.436 8292.808 S 2066.566 E 5965887 N 373666 E
11465.47 59.09 164.26 6938.388 6990.878 8371.065 S 2087.655 E 5965809 N 373685.8 E
11560.87 62.89 162.79 6984.647 7037.137 8451.047 S 2111.329 E 5965728 N 373708.1 E
11656.58 63.94 162.28 7027.4 79 7079.969 8532.69 S 2137.018 E 5965646 N 373732.4 E
11752.09 68.54 161.92 7065.951 7118.441 8615.849 S 2163.883 E 5965563 N 373757.8 E
11847.49 73.99 160.33 7096.583 7149.073 8701.294 S 2193.117 E 5965477 N 373785.6 E
11943.21 79.14 157.93 7118.818 7171.308 8788.242 S 2226.29 E 5965389 N 373817.2 E
12035.45 82.51 156.33 7133.525 7186.015 8872.127 S 2261.679 E 5965305 N 373851.2 E
12077.54 84.37 155.5 7138.333 7190.823 8910.298 S 2278.742 E 5965266 N 373867.6 E
12163.68 87.53 152.22 7144.418 7196.908 8987.412 S 2316.592 E 5965188 N 373904.1 E
12211 .68 91.05 149.29 7145.012 7197.502 9029.28 S 2340.035 E 5965146 N 373926.9 E
12260.32 91.3 149.17 7144.015 7196.505 9071.064 S 2364.913 E 5965104 N 373951 E
12305.79 91.54 149.89 7142.888 7195.378 9110.242 S 2387.963 E 5965064 N 373973.4 E ~
12355.67 91.48 150.35 7141.574 7194.064 9153.476 S 2412.804 E 5965021 N 373997.5 E
12392.46 90.99 151.14 7140.781 7193.271 9185.566 S 2430.779 E 5964988 N 374014.9 E
12448.94 89.44 150.84 7140.569 7193.059 9234.958 S 2458.169 E 5964939 N 374041.5 E
12497.3 89.01 151 .94 7141.223 7193.713 9277.408 S 2481.323 E 5964896 N 374063.9 E
12545.99 89.01 153.18 7142.064 7194.554 9320.613 S 2503.757 E 5964852 N 374085.6 E
12594.11 89.01 152.76 7142.896 7195.386 9363.47 S 2525.622 E 5964809 N 374106.7 E
12645.08 87.59 153.46 7144.408 7196.898 9408.908 S 2548.664 E 5964763 N 374129 E
12687.04 87.84 153.42 7146.081 7198.571 9446.41 S 2567.41 E 5964725 N 374147.1 E
12740.04 88.46 153.81 7147.792 7200.282 9493.864 S 2590.951 E 5964677 N 374169.8 E
12836.28 88.46 154.59 7150.378 7202.868 9580.478 S 2632.822 E 5964590 N 374210.2 E
12881.34 88.02 154.08 7151.762 7204.252 9621.073 S 2652.329 E 5964549 N 374229 E
12931.87 87.96 153.65 7153.534 7206.024 9666.409 S 2674.573 E 5964503 N 374250.4 E
12978.01 87.78 153.59 7155.249 7207.739 9707.716 S 2695.06 E 5964462 N 374270.2 E
13026.98 86.67 153.19 7157.62 7210.11 9751.447 S 2716.968 E 5964418 N 374291.4 E
13068.28 87.34 153.22 7159.778 7212.268 9788.261 S 2735.561 E 5964381 N 374309.3 E
13120.97 85.1 153.15 7163.251 7215.741 9835.18 S 2759.276 E 5964333 N 374332.3 E
13165.31 84.69 153.04 7167.197 7219.687 9874.564 S 2779.261 E 5964294 N 374351.6 E
13217.71 84.93 153.29 7171.937 7224.427 9921.129 S 2802.819 E 5964247 N 374374.3 E
13262.16 85.18 153.26 7175.768 7228.258 9960.683 S 2822.734 E 5964207 N 374393.6 E
13356.49 85.31 152.73 7183.588 7236.078 10044.44 S 2865.418 E 5964122 N 374434.8 E
13405.1 85.43 151 7187.512 7240.002 10087.16 S 2888.265 E 5964079 N 374456.9 E ~-e/
13452.62 85.68 150.78 7191.195 7243.685 10128.56 S 2911.313 E 5964037 N 374479.2 E
13504.4 7 85.92 151.23 7194.992 7247.482 10173.79 S 2936.379 E 5963992 N 374503.5 E
13545.47 86.17 150.73 7197.82 7250.31 10209.55 S 2956.221 E 5963956 N 374522.8 E
13597.2 86.73 150.34 7201.023 7253.513 10254.5 S 2981.618 E 5963910 N 374547.4 E
13645.51 86.97 150.71 7203.678 7256.168 10296.5 S 3005.353 E 5963868 N 374570.4 E
13691.54 87.35 150.26 7205.959 7258.449 10336.51 S 3028.001 E 5963827 N 374592.4 E
13741.03 87.34 150.57 7208.251 7260.741 10379.5 S 3052.409 E 5963784 N 374616 E
13791.08 87.71 150.66 7210.413 7262.903 10423.07 S 3076.945 E 5963740 N 374639.8 E
13836.19 87.9 150.61 7212.14 7264.63 10462.35 S 3099.049 E 5963700 N 374661.2 E
13886.54 88.21 150.65 7213.849 7266.339 10506.21 S 3123.729 E 5963656 N 374685.2 E
13932.41 88.46 150.84 7215.182 7267.672 10546.21 S 3146.136 E 5963616 N 374706.9 E
13978.34 88.7 150.15 7216.32 7268.81 10586.17 S 3168.749 E 5963575 N 374728.8 E
14024.17 90.37 150.52 7216.692 7269.182 10625.99 S 3191.43 E 5963535 N 374750.8 E
14077.16 90.49 150.47 7216.294 7268.784 10672.11 S 3217.527 E 5963489 N 374776.1 E
14126.57 90.8 150.35 7215.738 7268.228 10715.07 S 3241.923 E 5963445 N 374799.8 E
14172.67 92.84 150.29 7214.274 7266.764 10755.1 S 3264.737 E 5963405 N 374821.9 E --.,~,../-
14215.98 93.15 150.29 7212.011 7264.501 10792.66 S 3286.173 E 5963367 N 374842.7 E
14268.07 92.22 150.13 7209.571 7262.061 10837.82 S 3312.024 E 5963321 N 374867.8 E
14314.64 90.8 150.67 7208.344 7260.834 10878.3 S 3335.018 E 5963280 N 374890.1 E
14363.54 89.94 151.09 7208.028 7260.518 10921.01 S 3358.814 E 5963237 N 374913.1 E
14410.55 90.19 151.47 7207.975 7260.465 10962.24 S 3381 .403 E 5963196 N 374935 E
14459 92.41 151.7 7206.876 7259.366 11004.84 S 3404.451 E 5963153 N 374957.3 E
14502.28 93.27 151.62 7204.731 7257.221 11042.89 S 3424.971 E 5963114 N 374977.2 E
14550.95 94.88 151.5 7201.273 7253.763 11085.57 S 3448.09 E 5963071 N 374999.6 E
14583.06 95.07 151.36 7198.488 7250.978 11113.67 S 3463.388 E 5963043 N 375014.4 E
14649.93 95.19 151.55 7192.509 7244.999 11172.17 S 3495.214 E 5962984 N 375045.2 E
14686.31 94.39 150.95 7189.471 7241.961 11203.96 S 3512.651 E 5962952 N 375062.1 E
14745.22 92.96 150.01 7185.695 7238.185 11255.11 S 3541.617 E 5962900 N 375090.2 E
14786.55 91.79 150.66 7183.983 7236.473 11290.99 S 3562.055 E 5962864 N 375110E
14838.82 91.3 151.04 7182.573 7235.063 11336.63 S 3587.506 E 5962818 N 375134.7 E
14886.48 88.21 151.7 7182.777 7235.267 11378.45 S 3610.339 E 5962776 N 375156.8 E
14934.88 88.33 150.83 7184.238 7236.728 11420.87 S 3633.597 E 5962733 N 375179.3 E
14981.74 88.64 150.69 7185.477 7237.967 11461.75 S 3656.4 79 E 5962692 N 375201.5 E
15032.48 88.52 151.31 7186.735 7239.225 11506.11 S 3681.07 E 5962647 N 375225.3 E
15077.44 89.07 150.59 7187.68 7240.17 11545.41 S 3702.896 E 5962607 N 375246.5 E
15127.42 88.46 150.06 7188.757 7241.247 11588.82 S 3727.635 E 5962563 N 375270.5 E
15173.06 89.01 149.06 7189.765 7242.255 11628.16 S 3750.751 E 5962524 N 375292.9 E "-""
15222.42 89.26 150.26 7190.51 7243 11670.75 S 3775.681 E 5962481 N 375317.1 E
15266.61 89.26 149.97 7191.081 7243.571 11709.06 S 3797.698 E 5962442 N 375338.5 E
15311.86 88.83 152.03 7191.835 7244.325 11748.63 S 3819.631 E 5962402 N 375359.7 E
15350.65 87.71 151.93 7193.006 7245.496 11782.86 S 3837.845 E 5962367 N 375377.3 E
15413.86 88.27 150.11 7195.223 7247.713 11838.12 S 3868.451 E 5962312 N 375407 E
15458.19 89.07 152.2 7196.252 7248.742 11876.94 S 3889.83 E 5962272 N 375427.7 E
15509.22 89.07 152.12 7197.081 7249.571 11922.05 S 3913.658 E 5962227 N 375450.8 E
15552.33 88.76 152.05 7197.897 7250.387 11960.14 S 3933.837 E 5962189 N 375470.3 E
15602.02 90.43 153.21 7198.248 7250.738 12004.27 S 3956.679 E 5962144 N 375492.4 E
15647.17 92.41 154.26 7197.129 7249.619 12044.74 S 3976.652 E 5962103 N 375511.7 E
15700.05 92.1 153.59 7195.049 7247.539 12092.2 S 3999.877 E 5962055 N 375534.1 E
15743.79 92.1 153.32 7193.446 7245.936 12131.3 S 4019.411 E 5962016 N 375552.9 E
15795.5 91.91 153.61 7191.637 7244.127 12177.54 S 4042.498 E 5961969 N 375575.2 E
15840.82 92.22 153.21 7190.004 7242.494 12218.04 S 4062.77 E 5961928 N 375594.8 E
15888.86 92.04 153.35 7188.218 7240.708 12260.92 S 4084.356 E 5961885 N 375615.6 E
15931.98 92.1 153.42 7186.661 7239.151 12299.44 S 4103.661 E 5961846 N 375634.3 E -........-/
15985.44 92.9 153.31 7184.329 7236.819 12347.18 S 4127.604 E 5961798 N 375657.4 E
16032.31 96.12 151.76 7180.643 7233.133 12388.64 S 4149.149 E 5961756 N 375678.2 E
16078.39 96.31 151.66 7175.655 7228.145 12428.97 S 4170.86 E 5961716 N 375699.3 E
16175.39 96.68 151.38 7164.683 7217.173 12513.69 S 4216.817 E 5961630 N 375743.8 E
16273.06 97 150.62 7153.05 7205.54 12598.5 S 4263.831 E 5961545 N 375789.3 E
16347.01 97.31 150.87 7143.839 7196.329 12662.52 S 4299.689 E 5961480 N 375824.1 E
16389 97.31 150.87 7138.497 7190.987 12698.9 S 4319.963 E 5961443 N 375843.7 E
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
)
25-Jun-03
Re: Distribution of Survey Data for Well C02-58
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
'MD
'MD
16,389.00 I MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
d-03.-D85
RECEIVED
J" " 0 ~ n!\ w
UL : LuOJ
AJa..bf\ r"":~ .Q, Q.,.", r·,,",,'"0, r.,.., ...~ . .'
.:~~ V~. ~ .~..:' UV)_~ ~.I~ '..l;r1~,~,"1"~ii"J
. ...t"-'I.h..tI"'J:~.ì
~,jr-..J.¡I ~"."".."
. . .... ,.'".;~
ti]
00
~
!
f\)
~
Sperry-Sun Drilling Services
~
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-58
Job No. AKZZ0002452746, Surveyed: 5 June, 2003
Survey Report
25 June, 2003
;,~.....-
Your Ref: API 501032045700
Surface Coordinates: 5974214.18 N, 371741.60 E (70° 20'16.0287" N, 151002' 26.5445" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 974214.18 N, 128258.40 W (Grid)
Surface Coordinates relative to Structure: 228.28 S, 28.02 E (True)
Kelly Bushing: 52.49ft above Mean Sea Level
Elevation relative to Project V Reference: 52. 49ft
Elevation relative to Structure: 52. 49ft
spe!............y-su.,
DRILLING SERViCeS
A Halliburton Company
):F N T-YE
Survey Ref: svy261
Sperry-Sun Drilling Services
Survey Report for AlpIne CO.2 . CD2·58
Your Ref: API 501032045700
Job No. AKZZ0002452746, Surveyed: 5 June, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
0.00 0.000 0.000 -52.49 0.00 0.00 N 0.00 E 5974214.18 N 371741.60 E 0.00 AK-6 BP .IFR-AK
107.89 0.410 156.350 55.40 107.89 0.35 S 0.15 E 5974213.82 N 371741.75 E 0.380 0.38
196.42 0.740 156.350 143.92 196.41 1.17 S 0.51 E 5974213.00 N 371742.09 E 0.373 1.27
289.45 2.620 164.680 236.91 289.40 3.77 S 1.31 E 5974210.39 N 371742.85 E 2.033 3.94
.- 379.68 5.780 170.630 326.89 379.38 10.24 S 2.60E 5974203.89 N 371744.02 E 3.531 10.26
470.40 8.350 168.690 416.91 469.40 21.21 S 4.63E 5974192.89 N 371745.87 E 2.845 20.89
559.79 10.690 163.770 505.07 557.56 35.54 S 8.23 E 5974178.51 N 371749.22 E 2.769 35.22
648.28 11.780 164.160 591.86 644.35 52.11 S 12.99 E 5974161.86 N 371753.69 E 1.235 52.08
738.63 12.320 163.820 680.22 732.71 70.24 S 18.19 E 5974143.64 N 371758.58 E 0.603 70.53
828.50 13.840 164.250 767.75 820.24 89.79 S 23.78 E 5974123.99 N 371763.84 E 1.695 90.41
918.49 14.890 166.040 854.93 907.42 111.37 S 29.49 E 5974102.32 N 371769.18 E 1.267 112.14
1013.22 18.570 167.800 945.63 998.12 137.94 S 35.62 E 5974075.65 N 371774.85 E 3.921 138.45
1108.03 25.010 164.350 1033.63 1086.12 172.03 S 44.22 E 5974041.42 N 371782.87 E 6.923 172.58
1203.23 29.630 163.710 1118.19 1170.68 214.02 S 56.26 E 5973999.23 N 371794.19 E 4.863 215.29
1299.28 32.160 164.260 1200.60 1253.09 261.42 S 69.85 E 5973951.60 N 371806.97 E 2.650 263.51
1394.79 34.330 166.030 1280.48 1332.97 312.03 S 83.25 E 5973900.77 N 371819.50 E 2.489 314.46
1489.78 38.030 167.020 1357.14 1409.63 366.55 S 96.30 E 5973846.03 N 371831.61 E 3.943 368.70
1585.10 40.680 167.250 1430.83 1483.32 425.48 S 109.75 E 5973786.89 N 371844.06 E 2.784 427.02
1680.39 43.040 167.270 1501.80 1554.29 487.50 S 123.77 E 5973724.64 N 371857.02 E 2.477 488.33
1775.02 46.860 167.830 1568.76 1621.25 552.77 S 138.17 E 5973659.13 N 371870.30 E 4.058 552.69
1869.72 49.450 167.340 1631.93 1684.42 621.66 S 153.34 E 5973589.99 N 371884.29 E 2.762 620.61
~. 1964.92 50.590 167.280 1693.10 1745.59 692.82 S 169.37 E 5973518.56 N 371899.09 E 1.198 690.93
2059.96 52.980 164.990 1751.89 1804.38 765.30 S 187.28 E 5973445.79 N 371915.77 E 3.147 763.31
2154.98 53.880 165.740 1808.50 1860.99 839.14 S 206.56 E 5973371.63 N 371933.78 E 1.140 837.52
2250.30 54.370 165.160 1864.36 1916.85 913.90 S 225.97 E 5973296.55 N 371951.90 E 0.712 912.61
2345.56 54.180 166.250 1919.99 1972.48 988.84 S 245.06 E 5973221.30 N 371969.71 E 0.950 987.71
2440.98 54.470 166.430 1975.63 2028.12 1064.16 S 263.37 E 5973145.68 N 371986.73 E 0.340 1062.77
2536.23 54.690 166.520 2030.84 2083.33 1139.62 S 281.52 E 5973069.91 N 372003.59 E 0.243 1137.89
2631.65 54.780 167.930 2085.93 2138.42 1215.60 S 298.75 E 5972993.65 N 372019.51 E 1.210 1213.03
2726.90 54.090 165.760 2141.33 2193.82 1291.04 S 316.37 E 5972917.91 N 372035.84 E 1.990 1287.88
2821.80 54.070 164.190 2197.01 2249.50 1365.27 S 336.29 E 5972843.36 N 372054.49 E 1.340 1362.74
2916.61 56.170 164.470 2251.22 2303.71 1440.15 S 357.30 E 5972768.13 N 372074.21 E 2.228 1438.69
2990.56 56.880 165.210 2292.01 2344.50 1499.69 S 373.43 E 5972708.33 N 372089.32 E 1.272 1498.80
3060.60 57.200 164.480 2330.12 2382.61 1556.41 S 388.79 E 5972651.35 N 372103.71 E 0.987 1556.08
3156.36 57.840 164.310 2381.54 2434.03 1634.21 S 410.52 E 5972573.19 N 372124.11 E 0.685 1634.94
~-~---_.- --------.--- -_.---------"----- -----
25 June, 2003 - 10:37 Page 20f9 DrillQllest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-58
Your Ref: API501032045700
Job No. AKZZ0002452746, Surveyed: 5 June, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3252.13 58.290 164.530 2432.20 2484.69 1712.50 S 432.35 E 5972494.54 N 372144.60 E 0.509 1714.29
3347.95 58.670 164.250 2482.30 2534.79 1791.17 S 454.33 E 5972415.50 N 372165.23 E 0.468 1794.03
3443.68 58.650 164.590 2532.09 2584.58 1869.93 S 476.29 E 5972336.38 N 372185.84 E 0.304 1873.85
3539.48 58.450 164.700 2582.07 2634.56 1948.74 S 497.93 E 5972257.21 N 372206.13 E 0.231 1953.57
~ 3635.36 58.660 164.890 2632.09 2684.58 2027.67 S 519.39 E 5972177.92 N 372226.23 E 0.277 2033.30
3730.87 58.540 165.930 2681.85 2734.34 2106.56 S 539.92 E 5972098.69 N 372245.41 E 0.938 2112.57
3826.29 58.710 165.460 2731.53 2784.02 2185.51 S 560.05 E 5972019.41 N 372264.19 E 0.457 2191.68
3921.30 58.430 165.070 2781.07 2833.56 2263.91 S 580.67 E 5971940.67 N 372283.46 E 0.458 2270.56
4017.09 58.720 165.830 2831.02 2883.51 2343.03 S 601.21 E 5971861.21 N 372302.64 E 0.742 2350.02
4112.35 58.350 166.540 2880.74 2933.23 2421.93 S 620.61 E 5971781.99 N 372320.69 E 0.745 2428.76
4207.88 58.710 167.160 2930.61 2983.10 2501.27 S 639.14 E 5971702.34 N 372337.87 E 0.670 2507.48
4303.68 59.660 166.820 2979.69 3032.18 2581.43 S 657.67 E 5971621.88 N 372355.02 E 1.037 2586.92
4397.31 57.710 166.580 3028.35 3080.84 2659.27 S 676.07 E 5971543.73 N 372372.08 E 2.094 2664.25
4492.39 57.400 166.560 3079.36 3131.85 2737.32 S 694.70 E 5971465.38 N 372389.38 E 0.327 2741.87
4586.99 58.290 167.230 3129.71 3182.20 2815.32 S 712.86 E 5971387.08 N 372406.20 E 1.116 2819.23
4683.34 58.510 166.730 3180.19 3232.68 2895.27 S 731.35 E 5971306.82 N 372423.32 E 0.497 2898.47
4780.40 58.640 167.910 3230.80 3283.29 2976.08 S 749.53 E 5971225.72 N 372440.11 E 1.046 2978.31
4876.06 58.850 167.700 3280.43 3332.92 3056.01 S 766.80 E 5971145.51 N 372456.02 E 0.289 3056.96
4971.84 58.860 166.410 3329.97 3382.46 3135.89 S 785.16 E 5971065.31 N 372473.01 E 1.153 3136.08
5066.86 57.570 165.680 3380.02 3432.51 3214.28 S 804.64 E 5970986.61 N 372491.14 E 1.506 3214.40
5163.07 57.720 165.000 3431.51 3484.00 3292.91 S 825.21 E 5970907.64 N 372510.36 E 0.617 3293.44
.-- 5258.72 56.820 164.550 3483.23 3535.72 3370.54 S 846.34 E . 5970829.65 N 372530.16 E 1.021 3371.88
5354.32 56.900 164.560 3535.49 3587.98 3447.70 S 867.65 E 5970752.14 N 372550.16 E 0.084 3449.99
5448.06 57.280 164.530 3586.42 3638.91 3523.55 S 888.63 E 5970675.94 N 372569.83 E 0.406 3526.77
5545.81 56.950 162.840 3639.50 3691.99 3602.33 S 911.68 E 5970596.78 N 372591.53 E 1.491 3607.13
5640.80 57.850 162.360 3690.67 3743.16 3678.69 S 935.61 E 5970520.02 N 372614.16 E 1.039 3685.76
5735.11 55.930 160.830 3742.19 3794.68 3753.64 S 960.54 E 5970444.66 N 372637.80 E 2.448 3763.62
5828.11 54.640 163.520 3795.16 3847.65 3826.40 S 983.95 E 5970371.51 N 372659.96 E 2.752 3838.83
5925.26 54.260 164.710 3851.64 3904.13 3902.42 S 1005.59 E 5970295.13 N 372680.29 E 1.071 3916.08
6022.08 54.070 166.010 3908.33 3960.82 3978.37 S 1025.43 E 5970218.86 N 372698.83 E 1.106 3992.41
6116.31 54.020 165.510 3963.66 4016.15 4052.30 S 1044.19 E 5970144.61 N 372716.33 E 0.433 4066.4 7
6213.53 54.510 164.950 4020.44 4072.93 4128.61 S 1064.31 E 5970067.97 N 372735.14 E 0.687 4143.26
6308.40 54.750 164.970 4075.35 4127.84 4203.32 S 1084.38 E 5969992.93 N 372753.93 E 0.254 4218.62
6403.27 54.290 166.010 4130.42 4182.91 4278.10 S 1103.74 E 5969917.82 N 372772.01 E 1.016 4293.71
6498.01 53.980 165.990 4185.92 4238.41 4352.60 S 1122.31 E 5969843.02 N 372789.30 E 0.328 4368.17
---~--~-- - - ---- . ---- ----
25 June, 2003 - 10:37 Page 3 of9 DrillQlIest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-58
Your Ref: AP/501032045700
Job No. AKZZ0002452746, Surveyed: 5 June, 2003
North Slope, A/aska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6594.87 54.130 167.040 4242.78 4295.27 4428.85 S 1140.60 E 5969766.47 N 372806.28 E 0.891 4444.05
6688.04 54.180 167.410 4297.34 4349.83 4502.51 S 1157.30 E 5969692.54 N 372821.72 E 0.326 4516.88
6786.25 54.430 168.080 4354.65 4407.14 4580.45 S 1174.23 E 5969614.32 N 372837.31 E 0.610 4593.61
6881.77 54.790 168.720 4409.97 4462.46 4656.73 S 1189.89 E 5969537.78 N 372851.66 E 0.664 4668.28
,~ 6977.23 55.050 168.530 4464.83 4517.32 4733.31 S 1205.29 E 5969460.94 N 372865.76 E 0.317 4743.09
7072.72 55.630 168.600 4519.13 4571.62 4810.30 S 1220.86 E 5969383.70 N 372880.01 E 0.610 4818.34
7168.28 56.020 168.070 4572.81 4625.30 4887.72 S 1236.85 E 5969306.02 N 372894.67 E 0.614 4894.16
7263.90 56.170 168.320 4626.15 4678.64 4965.41 S 1253.09 E 5969228.07 N 372909.57 E 0.268 4970.34
7359.58 55.840 168.750 4679.65 4732.14 5043.15 S 1268.85 E 5969150.07 N 372924.01 E 0.508 5046.34
7455.28 55.800 167.330 4733.41 4785.90 5120.60 S 1285.26 E 5969072.35 N 372939.09 E 1.228 5122.39
7550.84 56.110 167.050 4786.91 4839.40 5197.81 S 1302.82 E 5968994.85 N 372955.32 E 0.405 5198.77
7646.35 56.310 167.490 4840.03 4892.52 5275.23 S 1320.31 E 5968917.14 N 372971.49 E 0.436 5275.31
7742.18 56.850 167.310 4892.81 4945.30 5353.29 S 1337.75 E 5968838.79 N 372987.60 E 0.585 5352.38
7837.35 57.030 167.170 4944.73 4997.22 5431.08 S 1355.37 E 5968760.71 N 373003.88 E 0.226 5429.30
7933.13 57.720 166.500 4996.37 5048.86 5509.63 S 1373.75 E 5968681.86 N 373020.91 E 0.931 5507.24
8028.61 58.230 166.410 5047.00 5099.49 5588.33 S 1392.71 E 5968602.85 N 373038.52 E 0.540 5585.59
8124.34 57.930 165.030 5097.61 5150.10 5667.07 S 1412.75 E 5968523.78 N 373057.21 E 1.263 5664.49
8219.79 57.260 164.630 5148.77 5201.26 5744.85 S 1433.83 E 5968445.65 N 373076.96 E 0.786 5743.04
8315.40 56.740 163.400 5200.84 5253.33 5821.93 S 1455.91 E 5968368.20 N 373097.72 E 1.208 5821.43
8410.68 56.450 162.790 5253.30 5305.79 5898.03 S 1479.04 E 5968291.71 N 373119.54 E 0.615 5899.46
8505.61 55.820 163.410 5306.20 5358.69 5973.45 S 1501.95 E 5968215.91 N 373141.16 E 0.857 5976.78
~. 8601.20 55.790 163.950 5359.92 5412.41 6049.33 S 1524.17 E 5968139.66 N 373162.08 E 0.468 6054.18
8695.17 55.590 164.440 5412.89 5465.38 6124.02 S 1545.31 E 5968064.63 N 373181.94 E 0.480 6130.02
8790.51 55.570 165.870 5466.78 5519.27 6200.03 S 1565.46 E 5967988.28 N 373200.79 E 1.237 6206.57
8887.96 56.170 165.940 5521 .46 5573.95 6278.27 S 1585.11 E 5967909.72 N 373219.09 E 0.619 6284.84
8983.39 56.220 166.920 5574.55 5627.04 6355.35 S 1603.71 E 5967832.33 N 373236.37 E 0.855 6361.59
9078.98 56.110 168.150 5627.78 5680.27 6432.88 S 1620.85 E 5967754.52 N 373252.18 E 1.075 6438.06
9173.08 56.260 167.550 5680.15 5732.64 6509.31 S 1637.31 E 5967677.82 N 373267.33 E 0.553 6513.23
9266.15 57.190 167.450 5731.21 5783.70 6585.27 S 1654.15 E 5967601.58 N 373282.87 E 1.003 6588.17
9365.59 57.260 167.340 5785.04 5837.53 6666.87 S 1672.39 E 5967519.68 N 373299.72 E 0.117 6668.74
9458.69 57.040 166.710 5835.54 5888.03 6743.08 S 1689.95 E 5967443.18 N 373315.97 E 0.616 6744.24
9556.89 57.190 166.170 5888.86 5941.35 6823.25 S 1709.29 E 5967362.69 N 373333.93 E 0.486 6824.07
9645.38 57.210 165.740 5936.80 5989.29 6895.41 S 1727.34 E 5967290.24 N 373350.75 E 0.409 6896.22
9743.16 56.680 165.210 5990.13 6042.62 6974.74 S 1747.89 E 5967210.56 N 373369.94 E 0.707 6975.89
9843.38 56.020 164.870 6045.66 6098.15 7055.34 S 1769.43 E 5967129.61 N 373390.09 E 0.717 7057.13
._---_._-----~--- ---- ------.------- -- ----- ---,._-- --..--
25 June, 2003 - 10:37 Page 4 of9 Drif/Quest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for AlpIne CD-2 - CD2-58
Your Ref: AP/501032045700
Job No. AKZZ0002452746, Surveyed: 5 June, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9936.71 55.540 164.090 6098.15 6150.64 7129.70 S 1790.08 E 5967054.91 N 373409.47 E 0.861 7132.45
10033.56 55.180 164.100 6153.20 6205.69 7206.33 S 1811.91 E 5966977.91 N 373429.99 E 0.372 7210.33
10127.07 55.130 165.150 6206.63 6259.12 7280.33 S 1832.26 E 5966903.58 N 373449.07 E 0.923 7285.19
10220.01 55.730 165.210 6259.37 6311.86 7354.31 S 1851.83 E 5966829.27 N 373467.37 E 0.648 7359.67
10319.06 55.570 166.770 6315.26 6367.75 7433.65 S 1871.63 E 5966749.61 N 373485.81 E 1.310 7438.98
.~-
10401.48 55.660 166.120 6361.80 6414.29 7499.77 S 1887.57 E 5966683.22 N 373500.62 E 0.660 7504.82
10510.87 56.380 166.260 6422.94 6475.43 7587.86 S 1909.23 E 5966594.78 N 373520.76 E 0.667 7592.72
10605.74 56.230 167.600 6475.57 6528.06 7664.74 S 1927.07 E 5966517.60 N 373537.29 E 1.186 7668.95
10701.87 56.760 168.810 6528.64 6581.13 7743.21 S 1943.46 E 5966438.87 N 373552.33 E 1.186 7745.88
10797.10 57.570 168.510 6580.28 6632.77 7821.66 S 1959.19 E 5966360.16 N 373566.72 E 0.891 7822.50
10892.52 57.190 167.910 6631.71 6684.20 7900.33 S 1975.61 E 5966281.21 N 373581.79 E 0.663 7899.63
10987.93 57.500 167.390 6683.19 6735.68 7978.80 S 1992.79 E 5966202.46 N 373597.63 E 0.562 7976.94
11083.45 57.700 167.260 6734.38 6786.87 8057.49 S 2010.49 E 5966123.49 N 373613.98 E 0.239 8054.69
11179.05 57.730 167.120 6785.44 6837.93 8136.29 S 2028.41 E 5966044.38 N 373630.55 E 0.128 8132.65
11274.57 57.640 166.240 6836.50 6888. 99 8214.85 S 2047.01 E 5965965.52 N 373647.80 E 0.784 8210.70
11370.00 57.120 165.590 6887.95 6940.44 8292.81 S 2066.57 E 5965887.24 N 373666.02 E 0.791 8288.69
11465.47 59.090 164 .260 6938.39 6990.88 8371.06 S 2087.65 E 5965808.63 N 373685.77 E 2.378 8367.65
11560.87 62.890 162.790 6984.65 7037.14 8451.05 S 2111.33 E . 5965728.26 N 373708.07 E 4.205 8449.36
11656.58 63.940 162.280 7027.48 7079.97 8532.69 S 2137.02 E 5965646.19 N 373732.36 E 1.196 8533.48
11752.09 68.540 161.920 7065.95 7118.44 8615.85 S 2163.88 E 5965562.58 N 373757.80 E 4.829 8619.49
11 847.49 73.990 160.330 7096.58 7149.07 8701.29 S 2193.12E 5965476.65 N 373785.57 E 5.927 8708.63
11943.21 79.140 157.930 7118.82 7171.31 8788.24 S 2226.29 E 5965389.14 N 373817.25 E 5.907 8800.95
.-' 12035.45 82.510 156.330 7133.52 7186.01 8872.13 S 2261.68 E 5965304.67 N 373851.20 E 4.035 8891.62
12077.54 84,370 155.500 7138.33 7190.82 8910.30 S 2278.74 E 5965266.21 N 373867.61 E 4.834 8933.33
12163.68 87.530 152.220 7144.42 7196.91 8987.41 S 2316.59 E 5965188.46 N 373904.13 E 5.280 9019.18
1 2211 .68 91.050 149.290 7145.01 7197.50 9029.28 S 2340.03 E 5965146.20 N 373926.86 E 9.541 9067.15
12260.32 91.300 149.170 7144.02 7196.51 9071.06 S 2364.91 E 5965103.99 N 373951.02 E 0.570 9115.73
12305.79 91.540 149.890 7142.89 7195.38 9110.24 S 2387.96 E 5965064.43 N 373973.39 E 1.669 9161.15
12355.67 91.480 150.350 7141.57 7194.06 9153.48 S 2412.80 E 5965020.77 N 373997.49 E 0.930 9210.99
12392.46 90.990 151.140 7140.78 7193.27 9185.57 S 2430.78 E 5964988.38 N 374014.91 E 2.526 9247.76
12448.94 89.440 150.840 7140.57 7193.06 9234.96 S 2458.17 E 5964938.53 N 374041.45 E 2.795 9304.23
12497.30 89.010 151.940 7141.22 7193.71 9277.41 S 2481.32 E 5964895.69 N 374063.88 E 2.442 9352.58
12545.99 89.010 153.180 7142.06 7194.55 9320.61 S 2503.76 E 5964852.11 N 374085.57 E 2.546 9401.26
12594.11 89.010 152.760 7142.90 7195.39 9363.47 S 2525.62 E 5964808.88 N 374106.70 E 0.873 9449.37
12645.08 87.590 153.460 7144.41 7196.90 9408.91 S 2548.66 E 5964763.06 N 374128.96 E 3.106 9500.30
--- --~--------- ------ .---- - - --.---------- ----
25 June, 2003 - 10:37 Page 50f9 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-58
Your Ref: API 501032045700
Job No. AKZZOD02452746, Surveyed: 5 June, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
12687.04 87.840 153.420 7146.08 7198.57 9446.41 S 2567.41 E 5964725.24 N 374147.06 E 0.603 9542.21
12740.04 88.460 153.810 7147.79 7200.28 9493.86 S 2590.95 E 5964677.39 N 374169.79 E 1.382 9595.16
12836.28 88.460 154.590 7150.38 7202.87 9580.48 S 2632.82 E 5964590.07 N 374210.17 E 0.810 9691.29
12881.34 88.020 154.080 7151.76 7204.25 9621.07 S 2652.33 E 5964549.15 N 374228.98 E 1.494 9736.29
~. 12931.87 87.960 153.650 7153.53 7206.02 9666.41 S 2674.57 E 5964503.44 N 374250.45 E 0.859 9786.75
12978.01 87.780 153.590 7155.25 7207.74 9707.72 S 2695.06 E 5964461.79 N 374270.22 E 0.411 9832.84
13026.98 86.670 153.190 7157.62 7210.11 9751.45 S 2716.97 E 5964417.69 N 374291.38 E 2.409 9881.74
13068.28 87.340 153.220 7159.78 7212.27 9788.26 S 2735.56 E 5964380.56 N 374309.34 E 1.624 9922.97
13120.97 85.100 153.150 7163.25 7215.74 9835.18 S 2759.28 E 5964333.24 N 374332.25 E 4.253 9975.53
13165.31 84.690 153.040 7167.20 7219.69 9874.56 S 2779.26 E 5964293.52 N 374351.56 E 0.957 10019.68
13217.71 84.930 153.290 7171.94 7224.43 9921.13 S 2802.82 E 5964246.56 N 374374.32 E 0.660 10071.86
1 3262.16 85.180 153.260 7175.77 7228.26 9960.68 S 2822.73 E 5964206.67 N 374393.55 E 0.566 10116.13
13356.49 85.310 152.730 7183.59 7236.08 10044.44 S 2865.42 E 5964122.20 N 374434.80 E 0.577 10210.12
13405.10 85.430 151.000 7187.51 7240.00 10087.16 S 2888.26 E 5964079.09 N 374456.91 E 3.556 10258.56
13452.62 85.680 150.780 7191.20 7243.69 10128.56 S 2911.31 E 5964037.31 N 374479.25 E 0.700 10305.93
13504.47 85.920 151.230 7194.99 7247.48 10173.78 S 2936.38 E 5963991.66 N 374503.54 E 0.982 10357.64
13545.4 7 86.170 150.730 7197.82 7250.31 10209.55 S 2956.22 E 5963955.56 N 374522.76 E 1.361 10398.54
13597.20 86.730 150.340 7201.02 7253.51 10254.50 S 2981.62 E . 5963910.18 N 374547.39 E 1.318 10450.15
13645.51 86.970 150.710 7203.68 7256.17 10296.50 S 3005.35 E 5963867.78 N 374570.40 E 0.912 10498.37
13691.54 87.350 150.260 7205.96 7258.45 10336.51 S 3028.00 E 5963827.40 N 374592.36 E 1.279 10544.33
13741.03 87.340 150.570 7208.25 7260.74 10379.50 S 3052.41 E 5963783.99 N 374616.03 E 0.626 10593.75
,- 13791.08 87.710 150.660 7210.41 7262.90 10423.07 S 3076.94 E 5963740.01 N 374639.82 E 0.761 10643.74
13836.19 87.900 150.610 7212.14 7264.63 10462.35 S 3099.05 E 5963700.35 N 374661.25 E 0.436 10688.81
13886.54 88.210 150.650 7213.85 7266.34 10506.20 S 3123.73 E 5963656.08 N 374685.17 E 0.621 10739.12
13932.41 88.460 150.840 7215.18 7267.67 10546.21 S 3146.14 E 5963615.70 N 374706.89 E 0.684 10784.96
13978.34 88.700 150.150 7216.32 7268.81 10586.17 S 3168.75 E 5963575.36 N 374728.82 E 1.590 10830.86
14024.17 90.370 150.520 7216.69 7269.18 10625.99 S 3191.43 E 5963535.16 N 374750.82 E 3.732 10876.67
14077.16 90.490 150.470 7216.29 7268.78 10672.11 S 3217.53 E 5963488.60 N 374776.12 E 0.245 10929.64
14126.57 90.800 150.350 7215.74 7268.23 10715.07 S 3241.92 E 5963445.23 N 374799.78 E 0.673 10979.03
14172.67 92.840 150.290 7214.27 7266.76 10755.10 S 3264.74 E 5963404.82 N 374821.90 E 4.427 11025.09
14215.98 93.150 150.290 7212.01 7264.50 10792.66 S 3286.17 E 5963366.89 N 374842.69 E 0.716 11068.32
14268.07 92.220 150.130 7209.57 7262.06 10837.82 S 3312.02 E 5963321.30 N 374867.77 E 1.812 11120.33
14314.64 90.800 150.670 7208.34 7260.83 10878.30 S 3335.02 E 5963280.43 N 374890.07 E 3.262 11166.87
14363.54 89.940 151.090 7208.03 7260.52 10921.01 S 3358.81 E 5963237.31 N 374913.13 E 1.957 11215.76
14410.55 90.190 151.470 7207.97 7260.46 10962.24 S 3381.40 E 5963195.71 N 374935.01 E 0.968 11262.77
-----------------.--- ,--- -- ----------
25 June, 2003 - 10:37 Page 60f9 D,íIIQuesf 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD·' . CD2·58
Your Ref: API 501032045700
Job No. AKZZ0002452746, Surveyed: 5 June, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) eft) eft) eft) (O/100ft)
14459.00 92.410 151.700 7206.88 7259.37 11004.84 S 3404.45 E 5963152.72 N 374957.33 E 4.607 11311.20
14502.28 93.270 151.620 7204.73 7257.22 11042.89 S 3424.97 E 5963114.33 N 374977.19 E 1.996 11354.43
14550.95 94.880 151.500 7201.27 7253.76 11085.57 S 3448.09 E 5963071.25 N 374999.58 E 3.317 11402.97
14583.06 95.070 151.360 7198.49 7250.98 11113.67 S 3463.39 E 5963042.90 N 375014.39 E 0.734 11434.96
14649.93 95.190 151.550 7192.51 7245.00 11172.17 S 3495.21 E 5962983.86 N 375045.21 E 0.335 11501.56
14686.31 94.390 150.950 7189.47 7241.96 11203.96 S 3512.65 E 5962951.78 N 375062.10 E 2.745 11537.81
14745.22 92.960 150.010 7185.70 7238.19 11255.11 S 3541.62 E 5962900.14 N 375090.19 E 2.903 11596.58
14786.55 91 .790 150.660 7183.98 7236.47 11290.99 S 3562.05 E 5962863.91 N 375110.01 E 3.238 11637.86
14838.82 91.300 151.040 7182.57 7235.06 11336.63 S 3587.51 E 5962817.85 N 375134.68 E 1.186 11690.10
14886.48 88.210 151.700 7182.78 7235.27 11378.45 S 3610.34 E 5962775.64 N 375156.79 E 6.630 11737.75
14934.88 88.330 150.830 7184.24 7236.73 11420.87 S 3633.60 E 5962732.83 N 375179.32 E 1.814 11786.13
14981.74 88.640 150.690 7185.48 7237.97 11461.75 S 3656.48 E 5962691.57 N 375201.50 E 0.726 11832.96
15032.48 88.520 151.310 7186.73 7239.22 11506.11 S 3681.07 E 5962646.79 N 375225.33 E 1.244 11883.68
15077.44 89.070 150.590 7187.68 7240.17 11545.41 S 3702.90 E 5962607.13 N 375246.48 E 2.015 11928.62
15127.42 88.460 150.060 7188.76 7241.25 11588.82 S 3727.63 E 5962563.30 N 375270.47 E 1.617 11978.57
15173.06 89.010 149.060 7189.76 7242.25 11628.16 S 3750.75 E 5962523.57 N 375292.91 E 2.500 12024.16
15222.42 89.260 150.260 7190.51 7243.00 11670.75 S 3775.68 E 5962480.55 N 375317.11 E 2.483 12073.48
15266.61 89.260 149.970 7191.08 7243.57 11709.06 S 3797.70 E 5962441.87 N 375338.47 E 0.656 12117.64
15311.86 88.830 152.030 7191.84 7244.33 11748.63 S 3819.63 E 5962401.93 N 375359.72 E 4.650 12162.88
15350.65 87.710 151.930 7193.01 7245.50 11782.86 S 3837.85 E 5962367.40 N 375377.35 E 2.899 12201.65
15413.86 88.270 150.110 7195.22 7247.71 11838.12 S 3868.45 E 5962311.63 N 375407.00 E 3.011 12264.81
~. 15458.19 89.070 152.200 7196.25 7248.74 11876.94 S 3889.83 E 5962272.45 N 375427.72 E 5.047 12309.12
15509.22 89.070 152.120 7197.08 7249.57 11922.05 S 3913.66 E 5962226.93 N 375450.77 E 0.157 12360.14
15552.33 88.760 152.050 7197.90 7250.39 11960.14 S 3933.84 E 5962188.50 N 375470.29 E 0.737 12403.25
15602.02 90.430 153.210 7198.25 7250.74 12004.26 S 3956.68 E 5962144.00 N 375492.38 E 4.092 12452.93
15647.17 92.410 154.260 7197.13 7249.62 12044.74 S 3976.65 E 5962103.19 N 375511.66 E 4.963 12498.04
15700.05 92.100 153.590 7195.05 7247.54 12092.20 S 3999.88 E 5962055.34 N 375534.07 E 1.395 12550.84
15743.79 92.100 153.320 7193.45 7245.94 12131.30 S 4019.41 E 5962015.90 N 375552.93 E 0.617 12594.54
15795.50 91.910 153.610 7191.64 7244.13 12177.54 S 4042.50 E 5961969.28 N 375575.22 E 0.670 12646.20
15840.82 92.220 153.210 7190.00 7242.49 12218.04 S 4062.77 E 5961928.44 N 375594.80 E 1.116 12691.'17
15888.86 92.040 153.350 7188.22 7240.71 12260.92 S 4084.36 E 5961885.20 N 375615.65 E 0.475 12739.46
15931.98 92.100 153.420 7186.66 7239.15 12299.44 S 4103.66 E 5961846.35 N 375634.29 E 0.214 12782.54
15985.44 92.900 153.310 7184.33 7236.82 12347.18 S 4127.60 E 5961798.20 N 375657.41 E 1.510 12835.93
16032.31 96.120 151.760 7180.64 7233.13 12388.64 S 4149.15 E 5961756.39 N 375678.25 E 7.620 12882.65
16078.39 96.310 151.660 7175.65 7228.14 12428.97 S 4170.86 E 5961715.69 N 375699.26 E 0.465 12928.46
~--- ->------ ---- ---.------. -------_._,- ----
25 June, 2003 - 10:37 Page 70'9 DrillQuest 3.03.02.005
Alaska North Slope
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
16175.39 96.680 151.380 7164.68 7217.17
16273.06 97.000 150.620 7153.05 7205.54
16347.01 97.310 150.870 7143.84 7196.33
16389.00 97.310 150.870 7138.50 7190.99
.~.
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-58
Your Ref: AP/501032045700
Job No. AKZZOO02452746, Surveyed: 5 June, 2003
North Slope, Alaska
Local Coordinates Global Coordinates Dogleg Vertical
Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (0/100ft)
12513.69 S 4216.82 E 5961630.20 N 375743.77 E 0.477 13024.83
12598.50 S 4263.83 E 5961544.59 N 375789.32 E 0.839 13121.79
12662.52 S 4299.69 E 5961479.97 N 375824.08 E 0.537 13195.15
12698.90 S 4319.96 E 5961443.25 N 375843.73 E 0.000 13236.79 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.49' MSL. Northings and Eastings are relative to 2133' FNL, 1494' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 2133' FNL, 1494' FEL and calculated along an Azimuth of 151.900° (True).
Magnetic Declination at Surface is 24.595°(19-May-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 16389.00ft.,
The Bottom Hole Displacement is 13413.58ft., in the Direction of 161.213° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
.--.
12698.90 S
4319.96 E Projected Survey
16389.00
7190.99
25 June, 2003 - 10:37
Comment
------
Page 8 0'9
DrillQuest 3.03.02.005
Alaska North Slope
Sperry-Sun Drilling Services
Survey RépOrt for Alpine CD-2 - CD2-58
Your Ref: AP/501032045700
Job No. AKZZ0002452746, Surveyed: 5 June, 2003
North Slope, Alaska
Survey tool program for CD2-58
From
Measured Vertical
Depth Depth
(ft) (ft)
~-
0.00
,--
25 June, 2003 - 10:37
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00 16389.00
7190.99 AK-6 BP _IFR-AK
------~-----
Page 9 of9
DrillQuest 3.03.02.005
')
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
)
25-Jun-03
Re: Distribution of Survey Data for Well C02-58 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
'MD
'MD
16,389.00 I MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
~03-D85
RECEIVED
JUL 0 1 2003
Alaska on & Gas Cons. Commiseion
~&~
([)
00
<J
\
¡
r<)
a
~
Sperry-Sun Drilling Services
-
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-58 MWD
Job No. AKMW0002452746, Surveyed: 5 June, 2003
Survey Report
25 June, 2003
~
Your Ref: API 501032045700
Surface Coordinates: 5974214.18 N, 371741.60 E (70020' 16.0287" N, 151002' 26.5445" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 974214.18 N, 128258.40 W (Grid)
Surface Coordinates relative to Structure: 228.28 S, 28.02 E (True)
Kelly Bushing: 52.49ft above Mean Sea Level
Elevation relative to Project V Reference: 52.49ft
Elevation relative to Structure: 52.49ft
Spa'-''-'Y-5UI!
DRILLING SERVlc:es
A Halliburton Company
Survey Ref: svy262
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-58 MWD
Your Ref: AP/501032045700
Job No. AKMWOO02452746, Surveyed: 5 June, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
0.00 0.000 0.000 -52.49 0.00 0.00 N 0.00 E 5974214.18 N 371741.60E 0.00 MWD M;:¡qnetic
107.89 0.410 156.350 55.40 107.89 0.35S 0.15 E 5974213.82 N 371741.75 E 0.380 0.38
196.42 0.740 156.560 143.92 196.41 1.17 S 0.51 E 5974213.00 N 371742.09 E 0.373 1.27
289.45 2.620 165.260 236.91 289.40 3.78 S 1.29 E 5974210.38 N 371742.82 E 2.034 3.94
~-- 379.68 5.780 171.190 326.89 379.38 10.26 S 2.51 E 5974203.88 N 371743.93 E 3.530 10.23
470.40 8.350 169.000 416.91 469.40 21.24 S 4.47 E 5974192.86 N 371745.70 E 2.848 20.84
559.79 10.690 164.330 505.06 557.55 35.60 S 7.95 E 5974178.45 N 371748.94 E 2.755 35.15
648.28 11 .780 164.590 591.86 644.35 52.21 S 12.56 E 5974161.76 N 371753.27 E 1.233 51.97
738.63 12.320 164.310 680.22 732.71 70.38 S 17.62 E 5974143.51 N 371758.01 E 0.601 70.39
828.50 13.840 164.730 767.75 820.24 89.98 S 23.04 E 5974123.82 N 371763.10 E 1.695 90.23
918.49 14.890 166.570 854.93 907.42 111.61 S 28.56 E 5974102.09 N 371768.25 E 1.272 111.91
1013.22 18.570 168.300 945.63 998.12 138.23 S 34.45 E 5974075.38 N 371773.68 E 3.920 138.17
1108.03 25.010 164.790 1033.63 1086.12 172.39 S 42.78 E 5974041.08 N 371781.43 E 6.927 172.22
1203.23 29.630 164.040 1118.19 1170.68 214.46 S 54.54 E 5973998.82 N 371792.46 E 4.866 214.87
1299.28 32.160 164.420 1200.60 1253.09 261.92 S 67.93 E 5973951.14 N 371805.04 E 2.642 263.04
1394.79 34.330 166.510 1280.48 1332.97 312.60 S 81.05 E 5973900.24 N 371817.29 E 2.569 313.93
1489.78 38.030 167.360 1357.14 1409.63 367.22 S 93.70 E 5973845.41 N 371829.01 E 3.931 368.07
1585.10 40.680 167.620 1430.83 1483.32 426.22 S 106.79 E . 5973786.19 N 371841.08 E 2.785 426.28
1680.39 43.040 167.670 1501.80 1554.29 488.33 S 120.39 E 5973723.86 N 371853.62 E 2.477 487.48
1775.02 46.860 168.280 1568.76 1621.25 553.71 S 134.31 E 5973658.25 N 371866.42 E 4.062 551.71
1869.72 49.450 167.800 1631.93 1684.42 622.72 S 148.93 E 5973589.00 N 371879.86 E 2.761 619.47
,~ 1964.92 50.590 167.690 1693.10 1745.59 694.01 S 164.42 E 5973517.46 N 371894.12 E 1.201 689.64
2059.96 52.980 165.440 1751.89 1804.38 766.62 S 181.79 E 5973444.57 N 371910.25 E 3.128 761.88
2154.98 53.880 166.680 1808.50 1860.99 840.68 S 200.17 E 5973370.20 N 371927.36 E 1.413 835.87
2250.30 54.370 165.590 1864.36 1916.85 915.66 S 218.68 E 5973294.91 N 371944.58 E 1.060 910.73
2345.56 54.180 167.120 1919.99 1972.48 990.81 S 236.92 E 5973219.46 N 371961.54 E 1.319 985.61
2440.98 54.470 167.370 1975.64 2028.13 1066.41 S 254.03 E 5973143.58 N 371977.36 E 0.371 1060.36
2536.23 54.690 167.380 2030.84 2083.33 1142.16 S 271.00 E 5973067.55 N 371993.02 E 0.231 1135.17
2631.65 54.780 168.400 2085.93 2138.42 1218.33 S 287.34 E 5972991.11 N 372008.06 E 0.878 1210.06
2726.90 54.090 166.970 2141.33 2193.82 1294.03 S 303.86 E 5972915.14 N 372023.29 E 1.420 1284.62
2821.80 54.070 165.820 2197.01 2249.50 1368.72 S 321.94 E 5972840.15 N 372040.08 E 0.982 1359.02
2916.61 56.170 163.830 2251.23 2303.72 1443.77 S 342.31 E 5972764.76 N 372059.17 E 2.805 1434.82
2990.56 56.880 164.190 2292.02 2344.51 1503.07 S 359.31 E 5972705.18 N 372075.14 E 1.042 1495.14
3060.60 57.200 164.750 2330.12 2382.61 1559.69 S 375.04 E 5972648.30 N 372089.91 E 0.812 1552.49
3156.36 57.840 164.410 2381.54 2434.03 1637.56 S 396.52 E 5972570.07 N 372110.05 E 0.732 1631.30
-_._--~-- ------.- .--
25 June, 2003 - 10:40 Page 2 of9 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD-I . CD2-58 MWD
Your Ref: API 501032045700
Job No. AKMWOO02452746, Surveyed: 5 June, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3252.13 58.290 164.760 2432.20 2484.69 1715.91 S 418.12 E 5972491.37 N 372130.31 E 0.563 1710.59
3347.95 58.670 164.010 2482.30 2534.79 1794.58 S 440.11 E 5972412.33 N 372150.95 E 0.776 1790.34
3443.68 58.650 163.460 2532.09 2584.58 1873.07 S 463.01 E 5972333.46 N 372172.50 E 0.491 1870.37
3539.48 58.450 164.320 2582.07 2634.56 1951.59 S 485.69 E 5972254.57 N 372193.84 E 0.794 1950.31
~, 3635.36 58.660 164.080 2632.09 2684.58 2030.29 S 507.96 E 5972175.49 N 372214.76 E 0.306 2030.23
3730.87 58.540 165.680 2681.86 2734.35 2108.99 S 529.22 E 5972096.45 N 372234.67 E 1.435 2109.67
3826.29 58.710 164.820 2731.54 2784.03 2187.77 S 549.97 E 5972017.32 N 372254.07 E 0.790 2188.93
3921.30 58.430 164.720 2781.08 2833.57 2266.00 S 571.26 E 5971938.75 N 372274.02 E 0.308 2267.97
4017.09 58.720 165.970 2831.02 2883.51 2345.07 S 591.94 E 5971859.32 N 372293.34 E 1.154 2347.46
4112.35 58.350 166.900 2880.75 2933.24 2424.06 S 611.00 E 5971780.03 N 372311.05 E 0.919 2426.11
4207.88 58.710 168.780 2930.62 2983.11 2503.70 S 628.16 E 5971700.10 N 372326.84 E 1.720 2504.45
4303.68 59.660 168.280 2979.70 3032.19 2584.33 S 644.52 E 5971619.20 N 372341.82 E 1.088 2583.29
4397.31 57.710 166.750 3028.36 3080.85 2662.43 S 661.80 E 5971540.82 N 372357.77 E 2.507 2660.32
4492.39 57.400 166.980 3079.37 3131.86 2740.57 S 680.03 E 5971462.38 N 372374.66 E 0.385 2737.83
4586.99 58.290 169.100 3129.72 3182.21 2818.91 S 696.62 E 5971383.77 N 372389.91 E 2.118 2814.76
4683.34 58.510 167.400 3180.21 3232.70 2899.25 S 713.34 E 5971303.15 N 372405.24 E 1.520 2893.50
4780.40 58.640 168.390 3230.82 3283.31 2980.23 S 730.70 E 5971221.89 N 372421.22 E 0.881 2973.11
4876.06 58.850 168.490 3280.45 3332.94 3060.35 S 747.09 E 5971141.50 N 372436.24 E 0.237 3051.50
4971.84 58.860 166.740 3329.99 3382.48 3140.41 S 764.67 E 5971061.15 N 372452.45 E 1.564 3130.41
5066.86 57.570 166.040 3380.04 3432.53 3218.91 S 783.67 E 5970982.34 N 372470.10 E 1.495 3208.61
5163.07 57.720 165.640 3431.53 3484.02 3297.72 S 803.56 E 5970903.20 N 372488.63 E 0.384 3287.49
r- 5258.72 56.820 166.960 3483.25 3535.74 3375.88 S 822.62 E 5970824.72 N 372506.35 E 1.494 3365.42
5354.32 56.900 166.270 3535.51 3588.00 3453.76 S 841.15E 5970746.54 N 372523.55 E 0.610 3442.84
5448.06 57.280 165.310 3586.44 3638.93 3530.05 S 860.47 E 5970669.93 N 372541.56 E 0.951 3519.24
5545.81 56.950 163.150 3639.52 3692.01 3609.04 S 882.77 E 5970590.57 N 372562.51 E 1.886 3599.42
5640.80 57.850 162.560 3690.70 3743.19 3685.50 S 906.36 E 5970513.71 N 372584.79 E 1.082 3677.99
5735.11 55.930 161.350 3742.21 3794.70 3760.61 S 930.82 E 5970438.20 N 372607.96 E 2.302 3755.76
5828.11 54.640 164.320 3795.18 3847.67 3833.63 S 953.39 E 5970364.80 N 372629.28 E 2.969 3830.81
5925.26 54.260 165.430 3851.67 3904.16 3909.93 S 974.02 E 5970288.16 N 372648.60 E 1.009 3907.83
6022.08 54.070 166.530 3908.35 3960.84 3986.09 S 993.03 E 5970211.69 N 372666.31 E 0.942 3983.96
6116.31 54.020 166.270 3963.68 4016.17 4060.22 S 1010.97 E 5970137.26 N 372682.98 E 0.230 4057.81
6213.53 54.51 0 165.320 4020.46 4072.95 4136.72 S 1030.34 E 5970060.44 N 372701.03 E 0.940 4134.42
6308.40 54.750 165.770 4075.38 4127.87 4211.64 S 1049.65 E 5969985.21 N 372719.06 E 0.462 4209.59
6403.27 54.290 166.380 4130.44 4182.93 4286.62 S 1068.24 E 5969909.92 N 372736.36 E 0.714 4284.49
6498.01 53.980 166.070 4185.95 4238.44 4361.19 S 1086.52 E 5969835.05 N 372753.37 E 0.421 4358.88
____.__________. ____._.__ ____r__ ____________________
25 June, 2003 - 10:40 Page 3 of9 DrillQlIest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for AlplneCD-2 - CD2-58 MWD
Your Ref: AP/501032045700
Job No. AKMW0002452746, Surveyed: 5 June, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
6594.87 54.130 167.010 4242.81 4295.30 4437.45 S 1104.77 E 5969758.49 N 372770.31 E 0.801 4434.75
6688.04 54.1 80 167.310 4297.37 4349.86 4511.08 S 1121.56 E 5969684.57 N 372785.83 E 0.266 4507.61
6786.25 54.430 167.950 4354.67 4407.16 4588.99 S 1138.64 E 5969606.39 N 372801.58 E 0.587 4584.39
6881.77 54.790 168.500 4409.99 4462.48 4665.22 S 1154.53 E 5969529.89 N 372816.17 E 0.602 4659.12
,-. 6977 .23 55.050 168.450 4464.85 4517.34 4741.77 S 1170.14 E 5969453.09 N 372830.46 E 0.276 4733.99
7072.72 55.630 168.41 0 4519.16 4571.65 4818.72 S 1185.89 E 5969375.89 N 372844.90 E 0.608 4809.29
7168.28 56.020 168.030 4572.83 4625.32 4896.11 S 1202.03 E 5969298.23 N 372859.71 E 0.524 4885.16
7263.90 56.170 168.750 4626.17 4678.66 4973.85 S 1218.00 E 5969220.23 N 372874.35 E 0.644 4961.26
7359.58 55.840 168.500 4679.67 4732.16 5051.61 S 1233.65 E 5969142.20 N 372888.67 E 0.407 5037.23
7455.28 55.800 167.610 4733.43 4785.92 5129.07 S 1250.04 E 5969064.48 N 372903.72 E 0.770 5113.27
7550.84 56.110 167.580 4786.93 4839.42 5206.40 S 1267.04 E 5968986.87 N 372919.41 E 0.325 5189.50
7646.35 56.310 166.660 4840.05 4892.54 5283.78 S 1284.74 E 5968909.20 N 372935.78 E 0.827 5266.09
7742.18 56.850 166.140 4892.83 4945.32 5361.52 S 1303.55 E 5968831 .15 N 372953.25 E 0.723 5343.53
7837.35 57.030 165.630 4944.75 4997.24 5438.87 S 1323.00 E 5968753.47 N 372971.38 E 0.487 5420.92
7933.13 57.720 165.640 4996.39 5048.88 5517.02 S 1343.01 E 5968675.00 N 372990.05 E 0.720 5499.29
8028.61 58.230 166.370 5047.02 5099.51 5595.56 S 1362.59 E 5968596.13 N 373008.28 E 0.840 5577.79
8124.34 57.930 164.850 5097.64 5150.13 5674.27 S 1382.78 E 5968517.09 N 373027.12 E 1.384 5656.73
8219.79 57.260 164.930 5148.79 5201.28 5752.07 S 1403.79 E . 5968438.94 N 373046.80 E 0.705 5735.25
8315.40 56.740 164.710 5200.86 5253.35 5829.45 S 1424.78 E 5968361.21 N 373066.4 7 E 0.577 5813.41
8410.68 56.450 162.470 5253.32 5305.81 5905.75 S 1447.25 E 5968284.54 N 373087.62 E 1.986 5891.29
8505.61 55,820 163.540 5306.22 5358.71 5981 .13 S 1470.29 E 5968208.78 N 373109.37 E 1.147 5968.64
.- 8601.20 55.790 164.320 5359.95 5412.44 6057.10 S 1492.18 E 5968132.44 N 373129.96 E 0.676 6045.96
8695.17 55.590 164.930 5412.91 5465.40 6131.94 S 1512.76 E 5968057.26 N 373149.25 E 0.577 6121.68
8790.51 55.570 166.760 5466.81 5519.30 6208.20 S 1531.99 E 5967980.69 N 373167.18 E 1.583 6198.00
8887.96 56.170 166.800 5521.48 5573.97 6286.72 S 1550.43 E 5967901.86 N 373184.28 E 0.617 6275.96
8983.39 56.220 166.370 5574.58 5627.07 6363.86 S 1568.83 E 5967824.42 N 373201.35 E 0.378 6352.67
9078.98 56.110 168.300 5627.81 5680.30 6441.32 S 1586.24 E 5967746.67 N 373217.43 E 1.681 6429.20
9173.08 56.260 167.540 5680.18 5732.67 6517.77 S 1602.60 E 5967669.95 N 373232.49 E 0.690 6504.34
9266.15 57.190 168.950 5731.24 5783.73 6593.95 S 1618.45 E 5967593.52 N 373247.03 E 1.613 6579.00
9365.59 57.260 168.870 5785.07 5837.56 6675.99 S 1634.53 E 5967511.21 N 373261.70 E 0.098 6658.96
9458.69 57.040 168.300 5835.57 5888.06 6752.66 S 1650.01 E 5967434.29 N 373275.87 E 0.566 6733.88
9556.89 57.190 167.960 5888.89 5941.38 6833.36 S 1666.97 E 5967353.31 N 373291.45 E 0.328 6813.05
9645.38 57.210 167.630 5936.83 5989.32 6906.06 S 1682.70 E 5967280.35 N 373305.93 E 0.314 6884.59
9743.16 56.680 166.990 5990.16 6042.65 6986.01 S 1700.70 E 5967200.10 N 373322.56 E 0.771 6963.60
9843.38 56.020 166.300 6045.70 6098.19 7067.18 S 1719.97 E 5967118.61 N 373340.44 E 0.873 7044.27
-------------~-- --~--_._---- "-----
25 June, 2003 - 10:40 Page 4 of9 DrillQlIest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-58 MWD
Your Ref: API 501032045700
Job No. AKMWOO02452746, Surveyed: 5 June, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
9936.71 55.540 165.130 6098.18 6150.67 7141.97 S 1739.01 E 5967043.51 N 373358.19 E 1.157 7119.21
10033.56 55.180 165.780 6153.23 6205.72 7219.09 S 1759.02 E 5966966.06 N 373376.88 E 0.666 7196.67
10127.07 55.130 165.130 6206.66 6259.15 7293.38 S 1778.29 E 5966891.45 N 373394.88 E 0.573 7271.28
10220.01 55.730 166.270 6259.40 6311.89 7367.53 S 1797.19 E 5966816.98 N 373412.51 E 1.199 7345.60
~ 10319.06 55.570 168.510 6315.29 6367.78 7447.33 S 1815.04 E 5966736.90 N 373429.00 E 1.874 7424.40
10401.48 55.660 166.230 6361.84 6414.33 7513.69 S 1829.91 E 5966670.29 N 373442.73 E 2.285 7489.94
10510.87 56.380 168.690 6422.99 6475.48 7602.23 S 1849.60 E 5966581.43 N 373460.90 E 1.977 7577.31
10605.74 56.230 166.710 6475.62 6528.11 7679.34 S 1866.41 E 5966504.04 N 373476.39 E 1.744 7653.26
10701.87 56.760 168.510 6528.69 6581.18 7757.63 S 1883.61 E 5966425.47 N 373492.24 E 1.656 7730.41
10797.10 57.570 168.900 6580.33 6632.82 7836.10 S 1899.28 E 5966346.75 N 373506.57 E 0.918 7807.01
10892.52 57.190 168.620 6631.76 6684.25 7914.92 S 1914.94 E 5966267.66 N 373520.88 E 0.469 7883.93
10987.93 57.500 167.510 6683.24 6735.73 7993.51 S 1931.55 E 5966188.80 N 373536.15 E 1.032 7961.08
11083.45 57.700 167.390 6734.43 6786.92 8072.24 S 1949.08 E 5966109.79 N 373552.33 E 0.235 8038.77
11179.05 57.730 166.050 6785.49 6837.98 8150.89 S 1967.64 E 5966030.83 N 373569.54 E 1.185 8116.90
11274.57 57.640 165.070 6836.56 6889.05 8229.07 S 1987.77 E 5965952.32 N 373588.33 E 0.872 8195.35
11370.00 57.120 164.900 6888.00 6940.49 8306.70 S 2008.60 E 5965874.34 N 373607.82 E 0.565 8273.64
11465.47 59.090 163.350 6938.44 6990.93 8384.65 S 2030.78 E 5965796.02 N 373628.67 E 2.481 8352.85
11560.87 62.890 161.430 6984.70 7037.19 8464.15 S 2056.04 E 5965716.11 N 373652.56 E 4.355 8434.87
11656.58 63.940 162.130 7027.53 7080.02 8545.44 S 2082.79 E 5965634.36 N 373677.93 E 1.277 8519.19
11752.09 68.540 161.290 7066.01 7118.50 8628.42 S 2110.23 E 5965550.93 N 373703.94 E 4.883 8605.30
11847.49 73.990 160.820 7096.64 7149.13 8713.83 S 2139.56 E 5965465.03 N 373731.80 E 5.732 8694.46
11943.21 79.140 159.080 7118.87 7171.36 8801.25 S 2171.48 E 5965377.07 N 373762.22 E 5.663 8786.61
12035.45 82.510 156.490 7133.58 7186.07 8885.53 S 2205.91 E 5965292.22 N 373795.20 E 4.586 8877.17
12077.54 84.370 156.640 7138.39 7190.88 8923.89 S 2222.54 E 5965253.58 N 373811.18 E 4.433 8918.85
12163.68 87.530 151.760 7144.47 7196.96 9001.22 S 2259.92 E 5965175.63 N 37384 7.23 E 6.737 9004.67
12211.68 91.050 147.990 7145.07 7197.56 9042.72 S 2284.00 E 5965133.72 N 373870.60 E 10.744 9052.62
12260.32 91.300 149.140 7144.07 7196.56 9084.21 S 2309.37 E 5965091.80 N 373895.25 E 2.419 9101.16
12305.79 91.540 147.450 7142.94 7195.43 9122.88 S 2333.25 E 5965052.73 N 373918.47 E 3.753 9146.53
12355.67 91 .480 150.170 7141.63 7194.12 9165.53 S 2359.07 E 5965009.64 N 373943.56 E 5.453 91 96.31
12392.46 90.990 150.800 7140.84 7193.33 9197.54 S 2377.19 E 5964977.33 N 373961.13 E 2.169 9233.08
12448.94 89.440 153.350 7140.62 7193.11 9247.44 S 2403.64 E 5964926.99 N 373986.72 E 5.283 9289.55
12497.30 89.010 154.100 7141.28 7193.77 9290.79 S 2425.05 E 5964883.27 N 374007.38 E 1.788 9337.89
12545.99 89.010 155.600 7142.12 7194.61 9334.86 S 2445.74 E 5964838.85 N 374027.31 E 3.080 9386.50
12594.11 89.010 160.430 7142.95 7195.44 9379.46 S 2463.74 E 5964793.95 N 374044.56 E 10.036 9434.33
12645.08 87.590 155.390 7144.46 7196.95 9426.65 S 2482.90 E 5964 7 46.44 N 374062.90 E 10.269 9484.98
-----~---------,~. .. -- --.- - - - - ~_. - - u_
25 June, 2003 - 10:40 Page 50f9 DrillQllest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for AlplneCD-2 - CD2-58 MWD
Your Ref: AP/501032045700
Job No. AKMWOO02452746, Surveyed: 5 June, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
12687.04 87.840 154.620 7146.14 7198.63 9464.65 S 2500.61 E 5964708.14 N 374079.96 E 1.928 9526.84
12740.04 88.460 153.660 7147.85 7200.34 9512.32 S 2523.72 E 5964660.09 N 374102.25 E 2.155 9579.77
12836.28 88.460 156.500 7150.43 7202.92 9599.56 S 2564.25 E 5964572.17 N 374141.28 E 2.950 9675.82
12881.34 88.020 155.800 7151.82 7204.31 9640.75 S 2582.46 E 5964530.67 N 374158.78 E 1.834 9720.73
-., 12931.87 87.960 153,690 7153.59 7206.08 9686.42 S 2604.00 E 5964484.64 N 374179.54 E 4.175 9771.17
12978.01 87.780 153.640 7155.31 7207.80 9727.74 S 2624.46 E 5964442.97 N 374199.29 E 0.405 9817.25
13026.98 86.670 151.400 7157.68 7210.17 9771.13 S 2647.02 E 5964399.20 N 374221.11 E 5.100 9866.16
13068.28 87.340 154.680 7159.84 7212.33 9807.89 S 2665.72 E 5964362.13 N 374239.18 E 8.095 9907.39
13120.97 85.100 154.880 7163.31 7215.80 9855.45 S 2688.12 E 5964314.19 N 374260.76 E 4.268 9959.90
13165.31 84.690 154.910 7167.25 7219.74 9895.44 S 2706.86 E 5964273.89 N 374278.81 E 0.927 10004.00
13217.71 84.930 154.060 7171.99 7224.48 9942.54 S 2729.34 E 5964226.41 N 374300.48 E 1.679 10056.13
13262.16 85.180 153.100 7175.83 7228.32 9982.20 S 2749.04 E 5964186.42 N 374319.50 E 2.224 10100.40
13356.49 85.310 152.570 7183.65 7236.14 10065.83 S 2791.96 E 5964102.07 N 374360.99 E 0.577 10194.39
13405.10 85.430 150.960 7187.57 7240.06 10108.52 S 2814.88 E 5964058.99 N 374383.17 E 3.310 10242.84
13452.62 85.680 151.620 7191.25 7243.74 10150.07 S 2837.64 E 5964017.06 N 374405.22 E 1.481 10290.21
13504.47 85.920 151.700 7195.05 7247.54 10195.58 S 2862.19 E 5963971.13 N 374428.98 E 0.488 10341.92
13545.4 7 86.170 151.330 7197.88 7250.37 10231.53 S 2881.69E 5963934.85 N 374447.87 E 1.087 10382.82
13597.20 86.730 151.090 7201.08 7253.57 10276.78 S 2906.56 E . 5963889.19 N 374471.96 E 1.177 10434.45
13645.51 86.970 150.000 7203.74 7256.23 10318.78 S 2930.28 E 5963846.79 N 374494.96 E 2.307 10482.67
13691.54 87.350 149.260 7206.02 7258.51 10358.45 S 2953.52 E 5963806.73 N 374517.52 E 1.805 10528.61
13741.03 87.340 149.410 7208.31 7260.80 10400.97 S 2978.74 E 5963763.78 N 374542.00 E 0.303 10578.00
--- 13791.08 87.710 150.500 7210.47 7262.96 10444.26 S 3003.77 E 5963720.08 N 374566.29 E 2.298 10627.97
13836.19 87.900 150.060 7212.20 7264.69 10483.40 S 3026.12 E 5963680.55 N 374587.97 E 1.062 10673.03
13886.54 88.210 149.200 7213.91 7266.40 10526.82 S 3051.56 E 5963636.71 N 374612.66 E 1.815 10723.31
13932.41 88.460 150.610 7215.24 7267.73 10566.49 S 3074.55 E 5963596.65 N 374634.97 E 3.121 10769.13
13978.34 88.700 150.390 7216.38 7268.87 10606.45 S 3097.16 E 5963556.31 N 374656.89 E 0.709 10815.03
14024.17 90.370 151.450 7216.75 7269.24 10646.50 S 3119.43 E 5963515.88 N 374678.48 E 4.316 10860.85
14077. 16 90.490 151.170 7216.35 7268.84 10692.98 S 3144.87 E 5963468.97 N 374703.12 E 0.575 10913.84
14126.57 90.800 151.040 7215.80 7268.29 10736.24 S 3168.75 E 5963425.31 N 374726.25 E 0.680 10963.24
14172.67 92.840 151.270 7214.33 7266.82 10776.60 S 3190.97 E 5963384.58 N 374747.78 E 4.453 11009.31
14215.98 93.150 154.500 7212.07 7264.56 10815.09 S 3210.68 E 5963345.76 N 374766.83 E 7.482 11052.55
14268.07 92.220 152.990 7209.63 7262.12 10861.75S 3233.70 E 5963298.71 N 374789.05 E 3.402 111 04.55
14314.64 90.800 150.780 7208.40 7260.89 10902.81 S 3255.64 E 5963257.28 N 374810.28 E 5.639 11151.10
14363.54 89.940 151.540 7208.09 7260.58 10945.64 S 3279.22 E 5963214.05 N 374833.13 E 2.347 11200.00
14410.55 90.190 150.920 7208.03 7260.52 10986.85 S 3301.85 E 5963172.46 N 374855.05 E 1.422 11247.00
---------- ---- ---------.- - --- - -----~---- -- -
25 June, 2003 - 10:40 Page 60f9 Dril/QlIest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for AlpIne CD-2 - CD2-58 MWD
Your Ref: API 501032045700
Job No. AKMWOO02452746, Surveyed: 5 June, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (01100ft)
14459.00 92.410 154.040 7206.93 7259.42 11029.80 S 3324.23 E 5963129.14 N 374876.69 E 7.902 11295.43
14502.28 93.270 153.930 7204.79 7257.28 11068.64 S 3343.19 E 5963089.97 N 374894.98 E 2.003 11338.63
14550.95 94.880 152.180 7201.33 7253.82 11111.92 S 3365.18 E 5963046.33 N 374916.23 E 4.879 11387.16
14583.06 95.070 152.490 7198.54 7251.03 11140.25 S 3380.03 E 5963017.75 N 374930.60 E 1.129 11419.15
/- 14649.93 95.190 151.800 7192.57 7245.06 11199.13 S 3411.15E 5962958.34 N 374960.70 E 1.043 11485.75
14686.31 94.390 151.540 7189.53 7242.02 11231.05S 3428.36 E 5962926.14 N 374977.36 E 2.311 11522.00
14745.22 92.960 150.410 7185.75 7238.24 11282.45 S 3456.88 E 5962874.26 N 375005.00 E 3.091 11580.78
14786.55 91.790 151.340 7184.04 7236.53 11318.52 S 3476.98 E 5962837.84 N 375024.48 E 3.615 11622.07
14838.82 91.300 151.690 7182.63 7235.12 11364.45 S 3501.90 E 5962791.50 N 375048.61 E 1.152 11674.32
14886.48 88.210 151 . 160 7182.83 7235.32 11406.29 S 3524.69 E 5962749.27 N 375070.68 E 6.578 11721.97
14934.88 88.330 151.390 7184.29 7236.78 11448.72 S 3547.94 E 5962706.45 N 375093.20 E 0.536 11770.35
14981.74 88.640 150.670 7185.53 7238.02 11489.70 S 3570.63 E 5962665.09 N 375115.19 E 1.672 11817.18
15032.48 88.520 151.280 7186.79 7239.28 11534.05 S 3595.24 E 5962620.32 N 375139.04 E 1.225 11867.90
15077.44 89.070 150.560 7187.74 7240.23 11573.34 S 3617.09 E 5962580.67 N 375160.21 E 2.015 11912.84
15127.42 88.460 148.760 7188.81 7241.30 11616.46 S 3642.33 E 5962537.12 N 375184.71 E 3.802 11962.77
15173.06 89.010 148.390 7189.82 7242.31 11655.40 S 3666.12 E 5962497.78 N 375207.83 E 1 .452 12008.32
15222.42 89.260 150.050 7190.57 7243.06 11697.80 S 3691.37 E 5962454.96 N 375232.35 E 3.401 12057.62
15266.61 89.260 150.070 7191.14 7243.63 11736.09 S 3713.43 E . 5962416.29 N 375253.75 E 0.045 12101.79
1 5311 .86 88.830 152.000 7191.89 7244.38 11775.67 S 3735.34 E 5962376.34 N 375274.98 E 4.369 12147.02
15350.65 87.710 151.990 7193.06 7245.55 11809.90 S 3753.54 E 5962341.81 N 375292.59 E 2.887 12185.79
15413.86 88.270 155.360 7195.28 7247.77 11866.51 S 3781.55 E 5962284.72 N 375319.63 E 5.401 12248.93
~ 15458.19 89.070 152.650 7196.31 7248.80 11906.34 S 3800.97 E 5962244.57 N 375338.37 E 6.372 12293.21
15509.22 89.070 152.430 7197.14 7249.63 11951.62 S 3824.50 E 5962198.90 N 375361.12E 0.431 12344.23
15552.33 88.760 153.020 7197.95 7250.44 11989.93 S 3844.25 E 5962160.25 N 375380.21 E 1.546 12387.33
15602.02 90.430 153.720 7198.31 7250.80 12034.34 S 3866.52 E 5962115.46 N 375401.72 E 3.644 12437.00
15647.17 92.410 155.100 7197.19 7249.68 12075.05 S 3886.02 E 5962074.43 N 375420.52 E 5.345 12482.09
15700.05 92.100 154.050 7195.11 7247.60 12122.77 S 3908.70 E 5962026.33 N 375442.38 E 2.069 12534.87
15743.79 92.100 153.710 7193.50 7245.99 12162.02 S 3927.95 E 5961986.76 N 375460.95 E 0.777 12578.55
15795.50 91.910 153.560 7191.69 7244.18 12208.32 S 3950.90 E 5961940.07 N 375483.11 E 0.468 12630.21
15840.82 92.220 153.250 7190.06 7242.55 12248.82 S 3971.17 E 5961899.23 N 375502.69 E 0.967 12675.48
15888.86 92.040 153.830 7188.27 7240.76 12291.80 S 3992.56 E 5961855.89 N 375523.34 E 1.263 12723.47
15931.98 92.100 153.710 7186.72 7239.21 12330.45 S 4011.61 E 5961816.92 N 375541.72E 0.311 12766.54
15985.44 92.900 152.900 7184.39 7236.88 12378.17 S 4035.60 E 5961768.80 N 375564.89 E 2.129 12819.93
16032.31 96.120 151.640 7180.70 7233.19 12419.52 S 4057.34 E 5961727.08 N 375585.92 E 7.374 12866.65
16078.39 96.310 151.570 7175.71 7228.20 12459.82 S 4079.12 E 5961686.42 N 375607.01 E 0.439 12912.45
----~-------------_.- - ---------._----
25 June, 2003 - 10:40 Page 70f9 DrillQllest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-58 MWD
Your Ref: API 501032045700
Job No. AKMWOO02452746, Surveyed: 5 June, 2003
Local Coordinates
Northings Eastings
(ft) (ft)
12544.82 S
12630.23 S
12694.29 S
12730.49 S
4124.54 E
4170.46 E
4206.24 E
4226.84 E
Alaska North Slope
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
16175.39 96.680 152.200 7164.74 7217.23
16273.06 97.000 151.270 7153.11 7205.60
16347.01 97.310 150.360 7143.90 7196.39
16389.00 97.310 150.360 7138.55 7191.04
.~
Global Coordinates
Northings Eastings
(ft) (ft)
5961600.65 N
5961514.46 N
5961449.80 N
5961413.26 N
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.49" MSL. Northings and Eastings are relative to 2133' FNL. 1494' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 2133' FNL, 1494" FEL and calculated along an Azimuth of 151.900° (True).
Magnetic Declination at Surface is 24.595°(19-May-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 16389.000.,
The Bottom Hole Displacement is 13413.86ft., in the Direction of 161.633° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
16389.00
7191.04
12730.49 S
4226.84 E Projected Survey
25 June, 2003 - 10:40
Page 8 0'9
375650.97 E
375695.42 E
375730.10 E
375750.08 E
Dogleg Vertical
Rate Section
(0/100ft)
0.750
1.001
1.291
0.000
13008.83
13105.80
13179.16
13220.80
North Slope, Alaska
Comment
Projected Survey
----------~---_. ---- --------..--- _. - - .-~
DrmQuest 3.03.02.005
DrillQllest 3.03.02.005
Page 9 0'9
-~-~-------------
7191.04 MWD Magnetic
0.00 16389.00
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
25 June, 2003 - 10:40
-
0.00
/~.
From
Measured Vertical
Depth Depth
(ft) (ft)
Survey tool program for CD2-58 MWD
North Slope, Alaska
Sperry-Sun Drilling Services
Survey Report for Alpine CD·2 - CD2-58 MWD
Your Ref: AP/501032045700
Job No. AKMWOO02452746, Surveyed: 5 June, 2003
Alaska North Slope
)
)
;1ù3-0~5
Well: CD2-58
Date: 5/23/2003
Casing Detail
95/8" Surface CasinQ
~PHILLlPS Alaska, Inc.
~' A Subsidiary of PHILLIPS PETROLEUM COMPANY
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN
LENGTH
DEPTH
TOPS
Jts 3 to 72
70 Jts
Doyon 19 RKB to LOS
FMC Gen V Hanger
9-5/8" 36# J-55 BTC Csg
Davis Lynch Float Collar
9-5/8" 36# J-55 BTC Csg
Davis Lynch Float Shoe
36.59
2.24
2925.64
1.50
87.10
2.26
36.59
38.83
2964.47
2965.97
3053.07
3055.33
Jts 1 to 2
2 Jts
9- 5/8" shoe @
TO 12 1/4" Surface Hole
3065.00
RUN TOTAL 41 BOWSPRING CENTRALlZERS-
1 per jt on Jt #1 - #12 (On stop rings of Jt #1 & #2)
#14,16,18,20,22,24,26,28,30,32,34,36,38,
40, 42, 44, 46, 48, 50, 52, 54, 56, 58, 60,62,64,66,68,70
boú.:)\M.£.~"" ~«~,".£J
76 joints total in shed - 72 joints total to run
Last 4 joints stay out, # 73 thru # 76.
\U/rJ::j O~ \.ulc\J"ð--S\
~\') ~~-;;~--
Use API Mod Best 0 Life Artie Grade Csg Compound.
Remarks: Up Wt - K Ibs
On Wt - K Ibs
Block Wt 75K Ibs
Supervisor. Don Mickey
')
ConocoPhillips Alaska
Cementing ·Report
Legal Well Name: C02-58
Common Well Name: C02-58
Event Name: ROT - DRILLING
Primary
Hole Size: 12.250 (in)
TMD Set: 3,055 (ft)
Date Set: 5/23/2003
Csg Type: Surface Casing
Csg Size: 9.625 (in.)
Cmtd. Csg: Surface Casing
Cement Co: Dowell Schlumberger
Rot Time Start: :
Rec Time Start:06:00
Report #:
Start:
1
5/14/2003
Cement Job Type: Primary
Squeeze Open Hole
Hole Size:
sa TMD: (ft)
sa Date:
sa Type:
Cmtd. Csg:
Squeeze Casing
Hole Size:
TMD Set:
Date Set:
Csg Type:
sa TMD:
sa Date:
Cmtd. Csg:
Cementer: Steve Doughten
Pipe Movement
Pipe Movement: Reciprocating
Time End: :
Time End: 09:00
RPM:
SPM: 2
Init Torque: (ft-Ibf)
Stroke Length: 20.0 (ft)
Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf)
Drag Up: 145,000 (Ibs) Drag Down: 125,000 (Ibs)
Type: Cement Casing
Volume Excess %: 175.00
Meas. From: 120
Time Circ Prior
To Cementing: 1.50
Mud Circ Rate: 294 (gpm)
Mud Circ Press: 320 (psi)
Stage No: 1 of 1
Start Mix Cmt: 08: 13
Start Slurry Displ: 08:15
Start Displ: 09:14
End Pumping: 09:55
End Pump Date: 5/23/2003
Top Plug: Y
Bottom Plug: Y
Disp Avg Rate:
Disp Max Rate:
Bump Plug:
Press Prior:
press Bumped:
Press Held:
Float Held:
7.00 (bbl/min)
7.00 (bbl/min)
Y
670 (psi)
2,500 (psi)
30 (min)
Y
)
Page 1 of 3
Spud Date: 5/21/2003
Report Date: 5/23/2003
End:
Plug
Hole Size:
Top Set: (ft)
BTM set: (ft)
Plug Date:
Plug Type:
Drilled Out:
Cmtd. Csg:
Returns: 100
Total Mud Lost:
Cmt Vol to Surf:
Ann Flow After: N
Mixing Method:
Density Meas By: densometer
Type: Spud Mud Density: 9.7 (ppg) Visc: 38 (s/qt)
Bottom Hole Circulating Temperature: (OF)
Displacement Fluid Type: Mud
PVIYP: 12 (cp)/10 (lb/100ft2) Gels 10 sec: 3 (lb/100ft2) Gels 10 min: 5 (lb/100ft2)
Bottom Hole Static Temperature: (OF)
Density: 9.7 (ppg) Volume: 229.00 (bbl)
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Stage No: 1 Slurry No: 1 of4
"-
DescriptioíÍ: Bioza~ater
Cmt Yol~ 40.0 (bbl) Density: 8.30 (ppg)
Slurrt Vol: (sk) Water Vol: (bbl)
. .
/
To: (ft)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Class:
Yield: (ft3/sk)
Other Vol: 0
Time
Compressive Strength 1:
Compressive Strength 2:
Purpose: Flush
Mix Water: (gal)
Foam Job: N
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Printed: 10/8/2003 6:53:26 PM
')
)
ConocoPhillips Alaska
Cementing Report
Legal Well Name: C02-58
Common Well Name: C02-58
Event Name: ROT - DRILLING
Page 2 of 3
Report #:
Start:
1
5/14/2003
Spud Date: 5/21/2003
Report Date: 5/23/2003
End:
Stage No: ~/~prry No: 2 of 4
¡
/l
Slurry Data
Fluid Type: Spacer
Slurry Interval: (ft) To: (ft)
Water Source:
." "
Descripti9p,:"'MUDPU$H XL Class:
Cmt v¡Æ' 50....0... (~þl)" Density: 1 0.50 (ppg) Yield: (ft3/sk)
Slur~ Vol: (sk,)/ Water Vol: (bbl) Other Vol: 0
,---,'
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF) ,
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Stage No: 1 Slurry No: 30f 4
Slurry Data
Fluid Type: LEAD
Slurry Interval: 2,555.00 (ft)To: (ft)
Water Source:
Description :..A.S:~Jt~
Cmt VoJ:/á74.0 o)bl)
", ¡/
Slu,~rýVol:~~O"(sk)
/,/.....,
(,--",.,/'
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Class: G
Density: 10.70 (ppg) Yield: 4.28 (fP/sk)
Water Vol: 226.0 (bbl) Other Vol: 0
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Pressure
(psi)
(psi)
Purpose: PRIMARY
Mix Water: (gal)
Foam Job: N
Pressure
(psi)
(psi)
Trade Name
Type
GYPSUM
DEFOAMER
EXTENDER
ACCELERATOR
FILLlTE
ACCELERATOR
DISPERSANT
0-53
0-46
0-79
S1
0-124
0-44
0-65
Concentration Units
30.00 %
0.60%
1.50%
1.50%
43.00 %
9.00 %BWOW
0.50%
Liquid Conc.
Stage No: 1 Slurry No: 4 of 4
Slurry Data
Fluid Type: TAIL Descripton:
Slurry Interval: 3,055.00 (ft)To: 2,555.00 (ft) Cmt Vol: 51.0 (bbl)
Water Source: Slurry Vol233 (sk)
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Class: G
Density: 15.80 (ppg) Yield: 1.16 (ft3/sk)
Water Vol: 31.0 (bbl) Other Vol: 0
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Units
Purpose: PRIMARY
Mix Water: (gal)
Foam Job: N
Pressure
(psi)
(psi)
Printed: 10/8/2003 6:53:26 PM
)
)
ConocoPhillips Alaska
Cementi ngReport
Page 3 of 3
Legal Well Name: C02-58
Common Well Name: C02-58
Event Name: ROT - DRILLING
Report #:
Start:
1
5/14/2003
Spud Date: 5/21/2003
Report Date: 5/23/2003
End:
Stage No: 1 Slurry No: 4 of4 - Additives
Trade Name
Type
DEFOAMER
DISPERSANT
ACCELERATOR
Concentration
0.20%
0.30%
2.00%
Units
Liquid Conc.
. Units
0-46
0-65
S1
Casing Test
Shoe Test
Liner Top Test
Test Press: 2,500 (psi)
For: 30 (min)
Cement Found between
Shoe and Collar: N
Pressure: '16.00 (ppge)
Tool: N
Open Hole: 2,0 (ft)
Hrs Before Ti9St:
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool: N
Tool: N
Tool: N
Log/Survey Evaluation
Interpretation· Summary
CBL Run: N
Under Pressure: (psi)
Bond Quality:
Cet Run: N
Bond Quality:
Temp Survey: N
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient: N
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required: N
Number of Remedial Squeezes:
Remarks
Cement 9 5/8" casing as follows: Pumped 40 bbls. biozan water wI nut plug - 6 bpm @ 200 psi wI rig pump - Switch to Dowell - Pumped
5 bbls water - test cement lines to 2500 psi - Dropped btm plug - Mixed & pumped 50 bbls Mudpush XL spacer @ 10.5 ppg - 5.7 bpm @
470 psi - Mixed & pumped lead slurry ( ASL "G" wI 30% 0-53, 0.6% 0046, 1.5% 0079, 1.5% S001, 43.1 % 0124, 9% BWOW 044,
0.5% D-65) @ 10.7 ppg -7 bpm @ 800 psi - Observej nut plug marker @ shakers wI 360 bbls lead pumped - cut off lead & pump down
surge can - 374 bbls total lead slurry pumped - switched to tail slurry ("G" wI 0.2% 046, 0.3% 065, 2% S001) @ 15.8 ppg - 5.7 bpm @
700 psi - Dropped top plug & pumped 20 bbls water wI Dowell - Switch to rig pumps - Displaced wI 9.7 ppg mud @ 7 bpm 250 to 670 psi
for first 195 bbls - slowed to 4 bpm @ 540 to 670 psi for last 14 bbls. - Bumped plug wI 780 psi - CI P @ 0950 hrs.
Full returns during job wI 120 bbls cement returns to surface - reciprocated pipe until start of tail slurry
Printed: 10/8/2003 6:53:26 PM
L
')
ConocoPhillips Alaska
Daily Drilling Report
WELL NAME
1 JOB NUMBER 1 EVE~TDC~DE 124 HRS PROG
Page 1 of3
SUPERVISOR
Don Mickey
CURRENT STATUS
RIH w/8 1/2" BHA - PU 4" DP fl shed
24 HR FORECAST
RIH - Drill out shoe track - Perform FIT - Drill 8 1/2" hole
LITHOLOGY 1 JAR HRS OF SERVICE 1 BHA HRS SINCE INSP
LAST SURVEY: DATE TMD INC AZIM 1 LAST CASING
5/21/2003 2,990.56 56.880 165.21,0 9.625 (in) @ 3,055.0 (ft)
DENSITY(ppg) 9.80 I PP l I ECD 19.651 MUD DATAl OAILYCOSTI
FV PVNP GELS WUHTHP FCIT.SOL OIUWAT %Sand/MBT Ph/pM
258 30/55 35/57 12.41 31 0.2/22.5 8.61
TMD 1 TVD 1 DFS
3,065.0 2,385.0 4.00
I FIELD NAME I OCS NO. AUTH MD I DAILY TANG
Alpine 16,306.0 0
ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD
o
DATE OF LAST SAFETY MEETING DAILY TOTAL
5/20/2003 391,071
ILEAKOFF AFE
10029371
1 NEXT CASING
7.000 (in) @ 12,306.0 (ft)
o J CUM COST I
Pf/Mf CI Ca·
0.10/0 40
C02-58
I RIG NAME & NO.
doyon1 @ppCO.co
Doyon 19
BHA NO. I 3 BHA I HOLE CONDITIONS
BHA WT. BELOW JARS STRING WT. UP STRING WT. ON STRING WT. ROT TORQUE I UNITS
ITEM DESCRIPTION NO JTS LENGTH 0.0. J.D.
Bit 1 1.50 12.250 3.750
Geo Pilot 1 20.15 7.625 2.000
Drill Collar - NonMag 1 9.20 6.750 2.810
Stabilizer - Non Mag 1 1.96 6.750 2.875
LWD 1 20.96 6.750 1.920
Stabilizer - Non Mag 1 2.20 6.750 2.813
LWD H-Cim 1 6.93 6.750 1.920
LWD OM Hoc 1 9.20 6.750 1.920
MWD MPT Pulser 1 10.00 6.750 1.920
Sub - Float 1 2.39 2.500 3.250
Flex Joint - Non Mag 1 31.10 6.750 2.810
Flex Joint - Non Mag 1 31.08 6.750 2.810
Flex Joint - NonMag 1 30.05 6.750 2.810
Stabilizer - Non Mag 1 5.61 6.750 2.880
Drill Pipe - Heavy Wgt 3 89.53 5.000 3.000
Jars Daily DNT 1 32.80 6.375 2.750
Drill Pipe - Heavy Wgt 11 330.63 5.000 3.000
Crossover 1 1.42 6.380 2.630
GHOST REAMER 1 6.95 8.437 2.190
Drill Pipe 39 1,240.76 4.000 3.240
GHOST REAMER 1 6.93 8.437 2.190
BIT I RUN
21
BITS
JETS OR TFA
15/15/15/15/151
DEPTH IN DATE IN I-O-D-L-B-G-O-R
3,065.0 5/23/2003 1-1-NO-A-D-I-EC- TO
BIT OPERATIONS
GPM I 'PRESS I P BIT I HRS I 24Hr OIST I 24Hr ROP I CUM HRS I CUM DEPTH I CUM ROP
OPERATIONS SUMMARY
PHASE DESCRIPTION
SURFAC Clean up rig floor - LD last of BHA componets
SURFAC RU to run 9 5/8" csg - Held pre job safety meeting
SURFAC Run 95/8" 36# J-55 BTC casing as follows: FS, 2 jts., FC, 70 jts. (72 jts. total)
SIZE MANUF.
8.500 DBS
TYPE
FM2653
SERIAL NO.
10539477
2
BIT I RUN
WOB
RPM
FROM TO
00:00 00:30
00:30 01 :30
01 :30 05:00
HOURS
0.50
1.00
3.50
CODE
DRILL T
CASE T
CASE P
TROUBLE SUB
DH OTHR
DH RURD
RUNC
1 REPT NO. 1 DATE
5 5/23/2003
ICUM. TANGO
CUM INTANG WI MUD
o
CUM COST WI MUD
821,968
AUTH.
LAST BOP PRES TEST
5/23/2003
H2S
o
LIME
ES
BIT NO. I 2
BHALENGTH
1,891.35
CONN SIZE CONN TYPE
Printed: 10/8/2003 6:49: 17 PM
')
')
C02-58
ConocoPhiUips Alaska
Daily DriUingReport
1 JOB NUMBER 1 EVE;TDc~DE 124 HRS PROG 1 T~~065.0
Page 2 of 3
WELL NAME
ITVD IDFS
2,385.0 4.00
I REPT NO. 1 DATE
5 5/23/2003
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
01:30 05:00 3.50 CASE P RUNC SURFAC - PU hanger & landing jt. - Land casing on landing ring wI FMC fluted mandrel
hanger wI shoe @ 3055' FC @ 2964' - Baker-Loc first 4 connections -
Attached bow spring centralizers to first 12 jts.- then every other jt. through #
70 - 41 total - run casing with no problems
* Note - Ran Davis Lynch bullet nose float shoe
05:00 06:00 1.00 CASE P RURD SURFAC RD casing equipment & fill up tool - Blow dn top drive - RU cement head
06:00 07:30 1.50 CEMENT P CIRC SURFAC Circulate hole clean & condition mud for cement job - inital rate 4 bpm @ 450
psi - final rate 7 bpm @ 320 psi - recripcating pipe 20' stroke - PU wt. 145 SO
wt. 125 - Held pre job meeting for cement job
07:30 10:00 2.50 CEMENT P PUMP SURFAC Cement 9 5/8" casing as follows: Pumped 40 bbls. biozan water wI nut plug - 6
bpm @ 200 psi wI rig pump - Switch to Dowell - Pumped 5 bbls water - test
cement lines to 2500 psi - Dropped btm plug - Mixed & pumped 50 bbls
Mudpush XL spacer @ 10.5 ppg - 5.7 bpm @ 470 psi - Mixed & pumped lead
slurry ( ASL "G" wI 30% 0-53, 0.6% 0046, 1.5% 0079, 1.5% S001 43.1 %
0124,9% BWOW 044, 0.5% 0-65) @ 10.7 ppg - 7 bpm @ 800 psi-
Observed nut plug marker @ shakers wI 360 bbls lead pumped - cut off lead &
pump down surge can - 374 bbls total lead slurry pumped - switched to tail
slurry ("G" wI 0.2% 046, 0.3% D65, 2% S001) @ 15.8 ppg - 5.7 bpm @ 700
psi - Dropped top plug & pumped 20 bbls water wI Dowell - Switch to rig
pumps - Displaced wI 9.7 ppg mud @ 7 bpm 250 to 670 psi for first 195 bbls -
slowed to 4 bpm @ 540 to 670 psi for last 14 bbls. - Bumped plug wI 780 psi -
CIP @ 0950 hrs.
Full returns during job wI 120 bbls cement returns to surface - recripcated pipe
until start of tail slurry
10:00 10:30 0.50 CEMENT P OTHR. SURFAC Pressure up on casing f/780 psi to 2500 psi & test casing for 30 mins. OK -
bleed off & check floats - floats held
10:30 11 :30 1.00 CEMENT P PULD SURFAC RD cement head & LD landing jt. - Clean up rig floor
11 :30 13:00 1.50 WELCTL P NUND SURFAC PJSM - NO riser, flow line, turnbuckles, & mouse hole - LD riser & starting
head (slip lock assembly)
13:00 14:00 1.00 WELCTL P NUND SURFAC Install FMC Unihead wellhead assembly - test seal to 1000 psi for 10 mins.
14:00 16:00 2.00 WELCTL P NUND SURFAC PJSM - NU BOPE - bell nipple, flowline, turnbuckles, service lines, mouse
hole, & drain lines
16:00 20:30 4.50 W ELCTL P BOPE. SURFAC Test BOPE - Annular to 250 psi & 3500 psi - Pipe rams, blind rams, choke &
kill lines valves, choke manifold valves, TIW, dart valve, manual & auto IBOP
to 250 psi & 5000 psi - perform accumulator closure test
AOGCC Chuck Scheve waived wittnessing of test
Pull test plug - install wear bushing
20:30 21:00 0.50 DRILL P OTHR SURFAC P_~.9~lIing bails & elevators - prep to PU 4" drill pipe
21:00 22:30 1.50 DRILL P PULD SURFAC PJSM - PU 45 jts. 4" DP fl shed & std. back in derrick
22:30 00:00 1.50 DRILL P PULD SURFAC PU BHA # 3 conponets - MU bit & Geo Pilot
24 HR SUMMARY: RU - Run & cement 9 5/8" csg - NU wellhead & BOPE - Test BOPE - PU 4" DP - Begin MU 8 1/2" BHA
COMPANY
ConocoPhillips Company
Doyon
ACI
Sperry Sun
SERVICE
PERSONNEL DATA
NO. HOURS COMPANY
1 MI
26 Swaco
5 Dowell
4
SERVICE
NO. HOURS
3
4
2
I
Printed: 10/8/2003 6:49:17 PM
WELL NAME
ITEM
Fuel
Water, Drilling
RESERVOIR NAME
CD2-19
OIL
CUM OIL
OIL
CUM OIL
OIL
CUM OIL
C02-58
UNITS
gals
bbls
)
ConocoPhillips Alaska
Daily Drilling Report
JOB NUMBER I EVE~DC~DE 124 HRS PROG I T;~065.0
USAGE
1,475
870
MATERIALS/CONSÜIVIPTION
ON HAND ITEM
-6,830 Water, Potable
-3,880
RESERVOIR AND INTERVAL DATA
ZONE TOP BASE
C02-58 1848 4 1450
H2O 0.00 OTHER 0.00
CUM H2O 0.00 CUM OTHER 0.00
FLUID RECOVERED
H2O 0.00 OTHER 0.00
CUM H2O 0.00 CUM OTHER 0.00
FLUIDS LEFT TO RECOVER
H2O 0.00 OTHER 0.00
CUM H2O 0.00 CUM OTHER 0.00
INPUT FLUID
0.00
0.00
0.00
0.00
0.00
0.00
')
Page 3 of 3
TVD I DFS
2,385.0 4.00
REPT NO. DATE
5 5/23/2003
UNITS
bbls
USAGE
120
ON HAND
-480
COMMENTS
Printed: 10/8/2003 6:49: 17 PM
Well Name:
Drilling Supervisor:
C02-58
I Rig:
Don Mickey
PRESSURE INTEGRITY TEST
PHILLIPS Alaska, Inc.
Doyon 19 I Date: 5/24/2003
I Pump used: I #1 Mud Pump r ...
... Pumping down annulus and DP. ....
Type of Test: Casing Shoe Test LOT/FIT
...
Casing Shoe Depth I I
3,055 Ft-MD 2,385 Ft-TVD
19-5/8" 36#/Ft J-55 BTC
Hole Depth
3,085 Ft-MD 2,395 Ft-TVD
...r
Hole Size: 8-1/2"
RKB-CHF: 36.6 Ft
CasinQ Size and Description:
CasinQ Test
Mud Weight: 9.5 ppg
Mud 10 min Gel: 12.0 Lb/100 Ft2
Test Pressure: 2,500 psi
Rotating Weight: 125,000 Lbs
Blocksffop Drive Weight: 75,000 Lbs
Estimates for Test: 2 bbls
Pressure InteQrityTest
Mud Weight: 9.5 ppg
Mud 10 min Gel: 12.0 Lb/100 Ft2
Rotating Weight: 125,000 Lbs
BlocksITop Drive Weight: 75,000 Lbs
Desired PIT EMW: 16.0 ppg
Estimates for Test: 806 psi
0.7 bbls
I...
...1
EMW = Leak-off Pressure + Mud Weight = 810 + 9.5
0.052 x TVD 0.052 x 2385
EMW at 3055 Ft-MD (2385 Ft-TVD) = 16.0 ppg
PIT 15 Second
Shut-in Pressure, psi
775
3000 .
- Lost 0 psi during test, held
= 100% of test pressure.
"--t__..-::":"~\¡[J 1
w
a:
:J
tJ)
tJ)
W
a:
a.
3 0 5 10 15 20 25 30
Shut-In time, Minutes
o PIT Point
f~ ... ~.'1l
2
Barrels
---CASING TEST
~LEAK-OFF TEST
Comments:
Tested casing after bumping plug on cement job - starting pressure 710 psi - brought up to 2500 psi
Extrapolated 0 psi/O displacement point on casing test
I Volume Input
Volume/Stroke
Pump Rate:
Strokes ... 0.1 000 Bbls/Strk ...
0.2 Bbl/min
...
Casing Test
Pressure Integrity Test
'"
Pumping Shut-in Pumping Shut-in
Strks psi Min psi Strks psi Min psi
0 0 0 2460 0 0 0 800
8 710 1 2460 1 40 0.25 775
9 780 2 2460 2 80 0.5 770
10 920 3 2460 3 ç 0 130 1 760
11 1000 4 2460 4 ~ 190 1.5 7F;0
12 1070 5 2460 5~() 270 2
13 1160 6 2460 6~ê) 360 2.5 7:3€
14 1250 7 2460 7M44O 3 730
15 1320 8 2460 8 -9) 520 3.5 725
16 1400 9 2460 9 lie 570 4 720
17 1490 10 2460 10 610 4.5 720
18 1580 15 2460 11 5u 660 5 715
"3:J
19 1670 20 2460 1240710 5.5 710
20 1760 25 2460 13 750 6 710
21 1850 30 2460 14 50 800 6.5 705
22 1960 151°810 7 700
23 2060 7.5 700
24 2150 8 700
25 2250 8.5 695
26 2350 9 695
27 2500 9.5 690
10 )
.~ -
Volume
Pumped
1.5 Bbls
Volume
Bled Back
1.0 Bbls
Volume
Pumped
2.7 Bbls
Volume
Bled Back
2.8 Bbls
)
')
Cono~hillips
Casing Detail
7" Intermediate Casing
Jt Number Num of Jts
Jts 3 to 294
Jts 1 to 2
Remarks:
COMPLETE DESCRIPTION OF EQUIPMENT RUN
Doyon 19 RKS to LOS
FMC 11" X 7" Hanger
292 Jts 7" 26# L-80 STCM Csg
7" Weatherford Float Collar
2 Jts 7" 26# L-80 STCM Csg
7" Weatherford Float Shoe
1'1 shoe @
8-1/2" TO
1 Straight blade centralizer on first 26 jts.
3 straight blade centraliers 1/jt on jts 220,221,222
35 straight blade centalizers every other jt on jts 224 - 292
Total Centralizers: 64
310 joints on rack -294 total jts. to run 1 16 last joints stay out
Use Best-a-Life 20m) pipe dope
Up Wi =k
On Wi =k Block Wi= 75K
Supervisor: Don Mickey
Well: CD2-58
Date: 5/28/2003
LENGTH
34.60
1.31
12007.91
1.32
82.33
1.46
DEPTH
TOPS
34.60
35.91
12043.82
12045.14
12127.47
12128.93
12147.00
)
)
ConocoPhillips Alaska
Daily Drilling Report
I JOB NUMBER I EVENOTDCRoDE 124 HRS PROG TMD I TVD I DFS
C02-58 12,147.0 7,197.0 11.00
I RIG NAME & NO. I FIELD NAME I OCS NO. AUTH MD I DAILY TANG
doyon1 @ppco.co Doyon 19 Alpine 16,306.0 0
ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD
Testing BOPE 0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL
Finish BOP test - Work on TO - MU 6 1/8" BHA 5/26/2003 376,675
LITHOLOGY I JAR HRS OF SERVICIE I BHA HRS SINCE INSP I LEAKOFF AFE
16.04 10029371
LAST SURVEY: DATE TMD INC AZIM I LAST CASING I NEXT CASING
5/28/2003 12,077.54 84.370 155.500 7.000 (in) @ 12,129.0 (ft) 3.500 (in) @ 11,600.0 (ft)
DENSITY(ppg) 9.80 ) PP I lECD I I MUD DATAl DAILY COST I 0 J CUM COST I
FV. PVIYP GELS WUHTHP FCIT.SOL OIUWAT· %Sand/MBTPh/pM Pf/Mf CI Ca H2S
41 7/19 7/9 5.21 I I 117.0 8.51 I
Page 1 of 2
SUPERVISOR
Don Mickey
CURRENT STATUS
I REPT NO. I DATE
12 5/3012003
ICUM. TANGO
CUM INT ANG WI MUD
o
CUM COST WI MUD
2,171,258
WELL NAME
AUTH.
LAST BOP PRES TEST
5/23/2003
o
LIME
ES
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
00:00 00:30 0.50 DRILL P PULD INTRM1 Clear floor of tools - LD Geo pilot manifold
00:30 03:30 3.00 DRILL P OTHR INTRM1 Pull wear bushing - set test plug - change top pipe rams fl 3 1/2"x6" VBR to 7"
pipe ram - test to 250 psi & 5000 psi - pull test plug - set thin wall wear
bushing
03:30 04:15 0.75 CASE P NUND INTRM1 RU to run 7" casing
04:15 04:30 0.25 CASE P SFTY INTRM1 Held pre job safety meeting - running casing
04:30 07:30 3.00 CASE P RUNC INTRM1 Run 7" 26# L-80 BTCM as follows: FS - 2 jts. - FC - 73 jts. to 3088' - (Baker
Lac 1 st four connections - pump through string on jt. #4 to check floats) install
straight blade centralizers to first 26 jts.
07:30 08:00 0.50 CASE P CIRC INTRM1 Circulate pipe volume @ 3088' - 5 1/2bbls/min @ 300 psi
PU wt. 135 SO wt 115
08:00 11 :30 3.50 CASE P RUNC INTRM1 Continue running 7" casing - fl 3088' to 7393' (180 jts. total)
11:30 12:00 0.50 CASE P CIRC INTRM1 Circulate btms up 213 GPM @ 670 psi - PU wt. 215 SO wt. 135
12:00 15:00 3.00 CASE P RUNC INTRM1 Continue running 7" casing - f/7393' to 10,689' (260 jts. total)
15:00 16:00 1.00 CASE P CIRC INTRM1 Circulate btms up - 5112 BPM @ 800 psi PU wt 330 SO wt 150
16:00 17:30 1.50 CASE P RUNC INTRM1 Finish running 7" casing f/1 0,689' to 12093' (294 jts. total)
PU hanger & landing jt. - Land casing wI FMC fluted mandrel hanger in
wellhead wI shoe @ 12,129' FC @ 12,043'
SO wt 150 - Unable to break over PU wt. pulled 395 K
LD fill up tool
17:30 19:00 1.50 CASE P CIRC INTRM1 MU cement head - Establish circ. 2.5 BPM @ 650 psi - final rate
6 bpm @ 810 psi -lower YP to < 20
Held pre job meeting while circulating
19:00 21 :00 2.00 CEMENT P PUMP INTRM1 Cement 7" casing as follows: Pumped 5 bbls CW-100 - Test cement lines to
3500 psi - Pumped 15 bbls CW-100 - Pumped 50 bbls Mud PushXL @ 12.5
ppg @ 4.5 bbls/min. - Dropped btm plug - Mixed & pumped 38 bbls slurry ( G
wI 046 0.2%, 065 0.3%, S001 2%) @ 15.8 ppg @ 5 bbls/min
Dropped top plug wI 20 bbls water fl Dowell - switched to rig pumps &
displaced wI 9.8 ppg mud @ 7 bbls/min @ 740 psi to 930 psi for first 412 bbls
of dispalcement - slowed pumps to 4 bbls/min @ 640 to 800 psi for remaining
displacement 30.7 bbls - total displacment 462.7 bbls - calc. 461.3 bbls. - Did
not bump plug - CIP @ 2100 hrs. - Full returns during job
21:00 21:30 0.50 CEMENT P PULD INTRM1 Check floats - slight flow back fl casing - LD cmt head - Install circulating
swedge - pressure up on casing to 450 psi - shut in - observed flow from
annulus - shut pipe rams
Printed: 10/8/2003 6:51 :23 PM
)
)
C02-58
ConocoPhillipsAlaska
Daily Drilling Report
I JOB NUMBER I EVENOTDCRODE 124 HRS PROG I TMD I TVD
12,147.0 7,197.0
Page 2 of 2
WELL NAME
IDFS
11.00
I REPT NO. I DATE
12 5/30/2003
FROM TO
21 :30 00:00
HOURS
2.50
CODE TROUBLE
CEMENT P
SUB
OTHR
OPERATIONS SUMMARY
PHASE DESCRIPTION
INTRM1 Monitor well - LD casing equip - clean up rig floor
24 HR SUMMARY: LD BHA - Change rams - RU & run 7" casing - Circ - Cement 7" - Observed flow f/7" csg & annulus - shut in casing & close
pipe rams - monior well
COMPANY
--_...~---_._----- ..-
ConocoPhillips Company
Doyon
ACI
Sperry Sun
SERVICE
PERSONNEL DATA
NO. HOURS COMPANY
._._._---~_._-
1
25
5
4
-- .-.--------...--.... -_..
SERVICE
HOURS
MI
NO.
3
4
2
1
----- --..---.-
Swaco
Dowell
FMC
ITEM
UNITS
gals
bbls
USAGE
1,285
150
MATERIALS I CONSUMPTION
ON HAND ITEM
-16,237 Water, Potable
-10,050
UNITS
bbls
USAGE
120
ON HAND
-1,320
Fuel
Water, Drilling
RESERVOIR NAME
CD2-19
RESERVOIR AND INTERVAL DATA
ZONE TOP BASE
C02-58 20 2 1490
COMMENTS
INPUT FLUID
OIL
CUM OIL
0.00
0.00
H2O 0.00 OTHER 0.00
CUM H2O 0.00 CUM OTHER 0.00
FLUID RECOVERED
H2O 0.00 OTHER 0.00
CUM H2O 0.00 CUM OTHER 0.00
FLUIDS LEFT TO RECOVER
H2O 0.00 OTHER 0.00
CUM H2O 0.00 CUM OTHER 0.00
OIL
CUM OIL
0.00
0.00
OIL
CUM OIL
0.00
0.00
Printed: 10/8/2003 6:51 :23 PM
ConocoPhillips Alaska
Cementing Report
Legal Well Name: C02-58
Common Well Name: C02-58
Event Name: ROT - DRILLING
Primary
Hole Size: 8.500 (in)
TMD Set: 12,129 (ft)
Date Set: 5/30/2003
Csg Type: Production Casing
Csg Size: 7.000 (in.)
Cmtd. Csg: Production Casing
Cement Co: Dowell Schlumberger
Rot Time Start:
Rec Time Start:
Time End:
Time End:
Type: Cement Casing
Volume Excess %: 40.00
Meas. From: 0
Time Circ Prior
To Cementing: 1.50
Mud Circ Rate: 252 (gpm)
Mud Circ Press: 900 (psi)
Report #:
Start:
2
5/14/2003
Cement Job Type: Primary
''ì
,)
Page 1 of 3
Spud Date: 5/21/2003
Report Date: 5/30/2003
End:
Plug
Hole Size:
Top Set: (ft)
BTM set: (ft)
Plug Date:
Plug Type:
Drilled Out:
Cmtd. Csg:
Cmtd. Csg:
Cementer: Jim Thompson
Pipe Movement
Pipe Movement: No movement
Squeeze Casing
Hole Size:
TMD Set:
Date Set:
Csg Type:
sa TMD:
sa Date:
Cmtd. Csg:
RPM:
SPM:
Init Torque: (ft-Ibf)
Stroke Length: (ft)
Avg Torque: (ft-Ibf)
Drag Up: (Ibs)
Max Torque: (ft-Ibf)
Drag Down: (Ibs)
Returns: 100
Total Mud Lost: (bbl)
Cmt Vol to Surf: (bbl)
Ann Flow After: Y
Mixing Method:
Density Meas By: densometer
Squeeze Open Hole
Hole Size:
sa TMD: (ft)
sa Date:
sa Type:
Stage No: 1 of 1
Start Mix Cmt: 19:39
Start Slurry Displ: 19:49
Start Displ: 19:49
End Pumping: 21 :00
End Pump Date: 5/30/2003
Top Plug: Y
Bottom Plug: Y
Disp Avg Rate:
Disp Max Rate:
Bump Plug:
Press Prior:
Press Bumped:
Press Held:
Float Held:
7.00 (bbl/min)
7.00 (bbl/min)
N
800 (psi)
(psi)
(min)
N
Type: Non-Disp. LS Density: 9.8 (ppg) Visc: 41 (s/qt)
Bottom Hole Circulating Temperature: (OF)
Displacement Fluid Type:Mud
PVNP: 7 (cp)/19 (lb/100fF) Gels 10 sec: 7 (lb/100ft2) Gels 10 min: 9 (lb/100fF)
Bottom Hole Static Temperature: (OF)
Density: 9.8 (ppg) Volume: 462.70 (bbl)
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Stage No: 1 Slurry No:·1 of 3
To: (ft)
Description: CW100
Cmt Vol: 20.0 (bbl)
Slurry Vol: (sk)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Density: 8.30 (ppg)
Water Vol: (bbl)
Class:
Yield: (ft3/sk)
Other Vol: 0
Time
Compressive Strength 1:
Compressive Strength 2:
Purpose: PRIMARY
Mix Water: (gal)
Foam Job: N
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Printed: 10/8/2003 6:54:16 PM
)
ConocoPhillips Alaska
Cementing Report
Legal Well Name: C02-58
Common Well Name: C02-58
Event Name: ROT - DRILLING
Report #:
Start:
2
5/14/2003
Stage No: 1 Slurry No: 20f 3
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft) To: (ft)
Water Source:
Description: MUDPUSH XL Class:
Cmt Vol: 50.0 (bbl) Density: 12.50 (ppg) Yield: (fP/sk)
Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Stage No: 1 Slurry No:3 of 3
Slurry Data
Fluid Type: TAIL Description:
Slurry Interval: 12,129.00 (ft)o: 11,045.00 (ftJ:;mt Vol: 38.0 (bbl)
Water Source: Slurry Vol:185 (sk)
)
Page 2 of 3
Spud Date: 5/21/2003
Report Date: 5/30/2003
End:
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Class: G
Density: 15.80 (ppg) Yield: 1.16 (fP/sk)
Water Vol: 50.0 (bbl) Other Vol: 0
Purpose: PRIMARY
Mix Water: (gal)
Foam Job: N
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Casing Test
Shoe Test
Test Press: (psi)
For: (min)
Cement Found between
Shoe and Collar:
Pressure: (ppge)
Tool:
Open Hole: (ft)
Hrs Before Test:
Liner Lap:
Pas Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool:
Log/Survey Evaluation
Interpretation Summary
CBL Run:
Under Pressure: (psi)
Bond Quality:
Cet Run:
Bond Quality:
Temp Survey:
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient:
Job Hating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required:
Number of Remedial Squeezes:
Remarks
MU cement head - Establish circ. 2.5 BPM @ 650 psi - final rate
6 bpm @ 810 psi -lower YP to < 20
Held pre job meeting while circulating
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Liner Top Test
Tool:
Tool:
Printed: 10/8/2003 6:54: 16 PM
)
)
ConocoPhillips Alaska
Cementi ngReport
Page 3 of 3
Legal Well Name: C02-58
Common Well Name: C02-58
Event Name: ROT - DRILLING
Report #:
Start:
2
5/14/2003
Spud Date: 5/21/2003
Report Date: 5/30/2003
End:
Remarks
Cement 7" casing as follows: Pumped 5 bbls CW-100 - Test cement lines to 3500 psi - Pumped 15 bbls CW-100 - Pumped 50 bbls Mud
PushXL @ 12.5 ppg @ 4.5 bbls/min. - Dropped btm plug - Mixed & pumped 38 bbls slurry ( G wI 046 0.2%, 0650.3%, S001 2%) @
15.8 ppg @ 5 bbls/min
Dropped top plug wI 20 bbls water fl Dowell - switchec¡ to rig pumps & displaced wI 9.8 ppg mud @ 7 bbls/min @ 740 psi to 930 psi for
first 412 bbls of dispalcement - slowed pumps to 4 bbls/min @ 640 to 800 psi for remaining displacement 30.7 bbls - total displacment
462.7 bbls - calc. 461.3 bbls. - Did not bump plug - CIP @ 2100 hrs. - Full returns during job
Check floats - slight flow back fl casing - LD cmt head - Install circulating swedge - pressure up on casing to 450 psi - shut in - observed
flow from annulus - shut pipe rams
Printed: 10/8/2003 6:54: 16 PM
Well Name:
Drilling Supervisor:
C02-58
I Rig:
Don Mickey
PRESSURE INTEGRITY TEST
PHILLIPS Alaska, Inc.
Doyon 19 I Date: 5/31/2003
I Pump used: I Cement Unit I'"
Type of Test: Annulus Leak Off Test for Disposal Adequacy
.. Pumping down annulus.
Hole Depth
11,045 Ft-MD 6,767 Ft-TVD
·1
Pressure IntearitvTest
Mud Weight: 9.8 ppg
Inner casing 00: 8.9 In.
125,000
75,000
14.5 ppg
583 psi
Desired PIT EMW:
Estimates for Test:
-0.1 bbls
I·
·1
EMW = Leak-off Pressure + Mud Weight = 646 98
0.052 x TVD 0.052 x 2385 + .
EMW at 3055 Ft-MD (2385 Ft-TVD) = 15.0
1 000 -
w
a:
::»
en 500 .
en
w
a:
D.
o
o 2 4
6
Barrels
---CASING TEST
Comments:
PIT 15 Second
Shut-in Pressure, psi
520
/
~ú~ '\ ~
~ \ '-\ <t: ~'" ~
R~
8 10
12
5 10 15 20 25
Shut-In time, Minutes
o PIT Point
o
---LEAK-OFF TEST
I Volume Input
Barrels T 0.1000 Bbls/Strk T
.. ~
Casing Test
Pumping Shut-in
Bbls psi Min si
o 0
Hole Size: 8-112" · Casing Shoe Depth I I
RKB-CHF: 34.9 Ft 3,055 Ft-MD 2,385 Ft-TVD
CasinQ Size and Description: 19-5/8" 36#/Ft J-55 BTC
ChanQes for Annular AdeQuacy Test
Enter outer casing shoe te~ 9.6 in comments
Casing Description referen( 23.0 casing string.
Hole Size is that drilled bel 2,550 casing.
Use estimated TOC for Ho 125,000
Enter inner casing 00 at right. 75,000
30
Volume
Pumped
0.0 Bbls
Volume
Bled Back
2.8 Bbls
Pump Rate:
0.5 Bbl/min
...
Pressure Integrity Test
Pumping Shut-in
Bbls psi Min psi
0 0 0 535
0.5 46 0.25 520
1 86 0.5 520
1.5 136 1 520
2 187 1.5 ~')O
2.5 237 2 ~
3 288 2.5
3.5 343 3 525
4 389 3.5 525
4.5 434 4 525
5 480 4.5 525
5.5 525 5 520
6 560 5.5 520
6.5 596 6 520
7 631 6.5 520
7.5 646 7 515
8 636 7.5 515
8.5 626 8 510
9 626 8.5 510
9.5 626 9 510
10 626 9.5 505
10.5 626 10 ,)
..~
Volume
Pumped
10.5 Bbls
Volume
Bled Back
1.0 Bbls
Alpine horizontals with OH sidetracks
1:(
,\
~
Subject: Alpine horizontals with OH sidetracks
From: "Brian D Noel" <Brian.Noel@conocophillips.com>
Date: Tue, 1 Jul2003 14:41 :04 -0800
To: tom _ maunder@admin.state.ak.us
CC: "Vernon T Johnson" <VemJohnson@conocophillips.com>, "Chip Alvord"
<Chip.Alvord@conocophillips.com>
~ ~ (') ~(.- ('\
.- ""~'9 """,,I
.'~
<-
.)
\1-0~-\C)'
Tom -
Added requested information to stick drawings for the three other Alpine
wells with open hole sidetracks in the horizontal section.
Closer look at CDl-21 shows first horizontal was out the bottom of sand
from 10,680 - 11,620' and then went out the top at 11,740' md. With
sidetrack point at 9910', there is approx 700' of sand in abandoned hole
that could take fluid (assuming that was reason for L1 designation, see
attached email from 2/26/01 on API suffix numbering) .
(See attached file: Alpine sidetracks.pdf) (See attached file: CDl-21
lateral naming.pdf)
Let me know if you need additional information - Brian 265-6979
----- Forwarded by Brian D Noel/PPCO on 06/30/2003 04:22 PM -----
Brian D Noel
06/16/2003 05:08 PM
To: Tom Maunder <tommauI'J.de:r.'@adm:ì.:n. state, a.k. us>
cc: Vernon T Johnson/PPCO@Phillips
Subject:
Re: CD2-58 and CD2-58L1(Document link: Brian D
Noel)
Tom -
Vern is out until wed 6/18. Did review the logs with geologist and found,
unfortunately that the sidetracks were due to going out the top of sand.
Pulled back to where horizontal was in sand and then resumed drilling
ahead. So don't expect any contribution to production from the abandoned
holes.
The CD2-15 3rd leg start point of 13,410' is correct, but the end of 2nd
leg should be 13,776' (not 13,376' as shown on drawing).
Sharon is compiling the ASP coordinates and tvd's and will send those over.
Thanks - Brian
Tom Maunder <tom maunder@admin.state.ak.us>
.........................-............"................................................................................................................................................
06/12/2003 01:29 PM
1 of3
5/26/2004 11: 18 AM
5/26/2004 11: 18 AM
20f3
Vern,
I checked with Steve and what you propose fits our understanding of a
lateral, so ConPPCo will need to send in a 401 and $100 for CD2-58L1.
You mentioned that there are some other wells where you have also done
OH sidetracks at Alpine. Could you give us a list of these wells and
the "numerology" specifics. Steve and I believe that the L1
To: Vernon T Johnson/PPCO@Phillips
cc: Steve Davies <steve davies@admin.state.ak.u8>,
Steve McMa i ns < steve mcma i ns@admin . s tat e . iik·..:··tiï3·;~""'·-·"··"'·"·"····""'·"'·"'''''''''''''''''·''''''·''''''''''''''...................................................................................
Subject: CD2-58 and CD2-58Ll
06/05/2003 01:34 PM
Tom Maunder <tom maunder@admin.state.ak.us>
Vern Johnson
907-265-6081 (w)
907-265-1515 (fax)
907-748-3906 (Cell)
y..~..~~~~...:...:!g.!:.~:..~..~?E~.~.~.S?!:?:S?..~~..?.P.~~.~..~...~:..~.P'..~....:...~¿.q:~~
The other wells where we have sidetracked at CD2 pad are CD2-13, and
CD2-15. CDl-21 on CD1 pad also had an open hole sidetrack. I am checking
to be sure how the naming was handled, but I think on all of these wells
we
followed the same convention, ie PB1 and -7x API suffix for the
inaccessible hole. See the attached schematic with the depth details.
Let
me know if you have any questions.
(See attached file: Visio-Sidetracks.pdf)
Thanks Tom,
Vernon T Johnson wrote:
I will pass this on to Steve Davies and we will have a look.
Tom Maunder
Vern,
Thanks for the information. Could you please provide a little information
as to why the OH sidetracks were performed?? Was
it a case of rock quality or (gasp) going out of the top of the reservoir??
At first glance the "non accessible" wellbore
sections are much shorter than on CD2-58, although that is not the case on
CDl-21. You might also look at the "take off"
point of the 3rd leg of CD2-15. Should that md be 13140??
Also, was/is there an expectation that the "non accessible" legs will
contribute to the wells production??
Could you also provide the ASP coordinates and TVDs of the various take off
points and TDs??
Re: CD2-58 and CD2-58L1
Subject:
cc: Chip Alvord/PPCO@Phillips, Brian D Noel/PPCO@Phillips
To: Vernon T Johnson/PPCO@Phillips
Alpine horizontals with OH sidetracks
Alpine horizontals with OH sidetracks
, ~
~'
particularly applies in the 2-58 case since you indicated that you "got
back into good rock" and you drilled another 3000'. It is likely, as
you hope, that this wellbore section will contribute to total
production.
If you can get the paperwork in tomorrow, we would appreciate. Since
this is an ongoing operation, we will not hold you up, but the paperwork
should be in a promptly as possible.
Tom Maunder, PE
AOGCC
(See attached file: tom_maunder.vcf)
------------------------------------------------------------------------
Name: Visio-Sidetracks.pdf
Visio-Sidetracks.pdf Type: Acrobat (application/pdf)
Encoding: base64
(See attached file: tom_maunder.vcf)
Content-Type: application/pdf
sidetracks. pdf
Content-Encoding: base64
I
I Content-Type: application/pdf
ICDl-21lateral naming.pdf b 6
I Content-Encoding: ase 4
Content-Type: application/octet-stream
Content-Encoding: base64
30f3
5/26/2004 11:18 AM
'(
9-.D3 - 0'35
\\~~~
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7111 Avenue, Suite 100
Anchorage, Alaska 99501-3539
June 20, 2003
RE: MWD Formation Evaluation Logs - CD2-58,
AK-MW-2452746
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this transmittal letter to the attention of:
Rob Kalish, Sperry-Sun Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
1 LDWG formatted Disc with verification listing.
API#: 50-103-20457-00.
" '
; \,.1 :~
i\ 'iT \ I:, :t J: t\\ _=.If~ ~ _((ffi\
\t ,
.I FRANK H. MURKOWSKI, GOVERNOR
. I· 1
J, \ . .
ALASKA OIL AND GAS ;;
CONSERVATION COMMISSION I
J
Chip Alvord
Drilling Team Leader
ConocoPhillips (Alaska), Inc.
PO Box 100360
Anchorage Alaska 99510-0360
333 w. 7TH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: Colville River Field CD2-58
ConocoPhillips (Alaska), Inc.
Pennit No: 203-085
Surface Location: 2143' FNL' 1493' FEL, Sec. 2, TIIN, R4E, UM
Bottomhole Location: 1065' FSL, 2506' FEL, Sec. 13, TIIN, R4E, UM
Dear Mr. Alvord:
Enclosed is the approved application for pennit to drill the above referenced development well.
This permit to drill does not exempt you from obtaining additional pennits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required pennits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the pennit in the event it was erroneously issued.
You have requested approval of annular disposal for this well. Such approval cannot be
considered until the information required by 20 AAC 25.080 (b) is submitted and evaluated.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the tenns and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
~ f·~vL..
Randy Ruedrich
Commissioner
BY ORDER OF THE COMMISSION
DATED this Il...day of May, 2003
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Exploration, Production and Refineries Section
ALi'
STATE OF ALASKA (
~A OIL AND GAS CONSERVATION COrJ
PERMIT TO DRILL
20 AAC 25.005
1 b Type of Well Exploratory
Service Development Gas
5.
3SION
~¡s
1 a.
Drill
Re-Entry
Name of Operator
ConocoPhillips Alaska, Inc.
Address
Stratigraphic Test Development Oil X
Single Zone X Multiple Zone
10. Field and Pool
Colville River Field
Alpine Oil Pool
Type of Work
X
Redrill
Deepen
2.
Datum Elevation (OF or KB)
OF 52'
Property Designation
ADL 380075
Unit or property Name
3.
6.
4.
P. O. Box 100360, Anchorage, AK 99510-0360
Location of well at surface
7.
2143' FNL, 1493' FEL, Sec. 2, T11 N, R4E, UM (Planned)
At target (=7" casing point)
Colville River Unit
8. Well number
685' FNL, 893' FWL, Sec. 13 T11 N, R4E, UM
At total depth
C02-58
9. Approximate spud date
1065' FSL, 2506' FEL, Sec. 13 T11 N, R4E, UM
12. Distance to nearest 13. Distance to nearest well
Property line C02-51
685'FNL 893'FWL 71' at 275' MD
Sec13T11 NR4E
Unit or property Name
05/21/2003
14. Number of acres in property
feet
11 . Type Bond (see 20 AAC 25.025)
Statewide
Number
#59-52-180
Amount
$200,000
15. Proposed depth (MD and TVD)
16304' MD
7272' TVD
feet
Feet
~ '~17 ~þ
17. Anticipated pressure (see 20 AAC 25.035(e)(2))
Kickoff depth
feet
Maximum ho:e angle
Maximum surface
2563
300
89.7°
18. Casing program Setting Depth
size Specifications Top Bottom
Hole Casing Weight Grade Coupling Length MD TVD MD TVD
42" 16" 62.5# H-40 Weld 77' 37' 37' 114' 114'
12.25" 9.625" 36# J-55 BTC 3067' 37' 37' 3104' 2390'
8.5"
N/A
L-80
L-80
BTC-M
I BT mod
12269'
11480'
37'
32'
12306'
11612'
37'
32'
7"
3.5"
26#
9.3#
19. To be completed for Redrill, Re-entry, and Deeper¡ Operations,
Present well condition summary
Total depth: measured feet
true vertical feet
Plugs (measured)
Effective depth:
feet
feet
Junk (measured)
measured
true vertical
Casing
Length
Size
Cemented
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
measured
true vertical
7227'
7060'
20. Attachments Filing fee X Property plat
Drilling fluid program X Time vs, depth plot
BOP Sketch
Refraction analysis
Diverter Sketch
Seabed report
psig At total depth (TVD)
3268 at psig
7220'
TVD.SS
Quantity of cement
(include stage data)
Pre-installed
551 Sx Arcticset III L &
230 Sx Class G
185 Sx Class G
Tubing
Measured depth
True Vertical depth
Drilling program X
20 AAC 25.050 requirements X
21 . I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~. ~ Ò ~ ~ -C.,. Ch.;r A \"0.....<. Title Dolling Team Leader
Commission Use Only
permit~~e~ _ o~çl ~6-1 n/~ 3 _ 20 ~~- 1 Approval date L/t~ ill? I ~~~e~~~~~:~~~~~~~
Conditions of approval Samples required Yes ~ Mucrl{g¡r~iied Yes 00
Hydrogen sulfide measures Yes (S) Directional survey required éii> No
Required working pressure for BOPE 2M 3M 5M 10M 15M :'\
Other 7:;. SU() \" ~\ "" \ <"\ '\ "" """ ~ í(> ~ > T \)'\;" "-~ .- '-'" <>. ~-.¡~ ~ ~ dO Þ..~~, () )~ \ \. J. )
Approved by ~- ~ ce,. -_~ ~ Commissioner
Form 10-401 Rev. 7-2f§9- ~ / "'-
Date 1'1¡ J, "Z-oa:1
by order of æ~
the comm' · e' I .., ~ c) )
RECEtVf. miti triplicåte
IIIIIo rmt;, ~
:,1 .
r ,~
.. "'\,;¡¡"
-
MAY 082003
Alasita OH & Gas Cons. Camm_n
Anchorage
'~.
CD2-58 Drilling Hazards Summary
(to be posted in Rig Floor Doghouse Prior to Spud)
(See Well Plan Attachment: Detailed Risk Information for further discussion of these risks)
.12-1/4" Hole /9-5/8" Casina Interval
Event Risk Level
Conductor Broach Low
Well Collision medium
Gas Hydrates Low
Running Sands and Gravel
Low
Abnormal Pressure in
Surface Formations
>2000' TVD
Lost Circulation
Low
Low
.8-1/2" Hole /7" Casina Interval
Event Risk Level
Abnormal Pressure in low
Surface Formations
>2000' TVD
Lost circulation Low
Hole swabbing on trips
Moderate
Abnormal Reservoir
Pressure
low
Hydrogen Sulfide gas
Low
M iti~ation Strateqy
Monitor cellar continuously during interval.
Gyro single shots, traveling cylinder diagrams
Monitor well at base of permafrost, increased mud
weight, decreased mud viscosity, increased
circulating times, controlled drilling rates, low mud
temperatures
Maintain planned mud parameters, Increase mud
weight, use weighted sweeps.
Increased mud weight
Reduced pump rates, mud rheology, lost circulation
material, use of low density cement slurries
M iti~ation Strate~y
BOPE drills, Keep mud weight above 9.6 ppg.
Check for flow during connections and if needed,
increase mud weight.
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECO) monitoring, mud
rheology, lost circulation material
Reduced trip speeds, mud properties, proper hole
filling, pumping out of hole, real time equivalent
circulating density (ECD) monitoring, weighted
sweeps.
Well control drills, increased mud weight. No
mapped faults occur within 7001 of the planned
wellbore.
H2S drills, detection systems, alarms, standard well
control practices, mud scavengers
.6-1/8" Hole / Horizontal Production Hole
Event Risk Level
Lost circulation moderate
Hole swabbing on trips
Moderate
Abnormal Reservoir
Pressure
Medium
Hydrogen Sulfide gas
Low
M iti~ation Strateqy
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECD) monitoring, mud
rheology, lost circulation material
Reduced trip speeds, Pump out to 7" shoe, mud
properties, proper hole filling, pumping out of hole,
real time equivalent circulating density (ECD)
monitoring, weighted sweeps.
BOPE drills, Keep mud weight above 9.0 ppg.
Check for flow during connections and if needed,
increase mud weight. Well control drills, increased
mud weight.
H2S drills, detection systems, alarms, standard well
control practices, mud scavengers
1&, h" ~. " ~~ ~ q 1
,,;, .... ..... "; l
fi I ,j \,;i.¡ {ì¡J ¡,.b.
\{
Alpine: CD2-58
Procedure
1. Move on Doyon 19.
2. Drill 12 14" hole to the surface casing point as per the directional plan.
3. Run and cement 9 5/8" surface casing.
4. Install and test BOPE to minimum 5000 psi.
5. Pressure test casing to 2500 psi.
6. Drill out 20' of new hole. Perform leak off test.
7. Drill 8 %" hole to the intermediate casing point in the Alpine Sand. (LWD tools, GR/RES/PWD)
8. Run and cement 7" casing as per program. Top of cement +1- 884 feet MD above Alpine reservoir. Carry
out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the
casing shoe. Freeze protect casing annulus.
9. Run drilling assembly.
10. Pressure test casing to 3500 psi.
11. Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable leak off for drilling
ahead is 11 .5 ppg EMW.
12. Swap fluid to mineral oil based drilling mud.
13. Drill 6-1/8" horizontal section to well TD. (LWD: GR/RES/PWD)
14. Run 3-1/2", 9.3 #, L-80 tubing with SSSV nipple, gas lift mandrels, sliding sleeve and production packer.
Land hanger.
15. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP.
16. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check.
17. Circulate diesel in tubing and annulus.
18. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi 130 mins.
19. Set BPV and secure well. Move rig off.
-:) , - t"':r, .~A
Ii I 1 ,¡ l:i 1 r~¡ i'~L.
<..()~~e
~~ ~(£)
~~..\~\. 7
R,,~Q
'f. '07
~,C(
(
Well Proximity Risks:
Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in
following attachments. C02-51 will be the closest well to C02-58. Well separation is 71.41 ft at 275 ft MD.
Accounting for survey uncertainty, the ellipse-to-ellipse separation is 5.1 ft at 275 ft MD.
Drillina Area Risks:
There are no high-risk events (e.g. over-pressures zones) anticipated.
Lost circulation: Faulting within the Alpine reservoir section is considered the most likely cause of lost
circulation. Standard LCM material has proved effective in dealing with lost circulation in previous
development wells.
Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally
as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed
kicks.
Annular Pumpina Operations:
Incidental fluids developed from drilling operations on well CD2-58 will be injected into a permitted annulus
on C02 pad or the class 2 disposal well on CD1 pad.
The CD2-58 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze
protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there
will be 500' of cement fill above the top of the Alpine as per regulations.
We request that CD2-58 be permitted for annular pumping of fluids occurring as a result of drilling
operations, per regulation 20 AAC 25.080. As stated above, any zones containing significant hydrocarbons
will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or
potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional
drilling plan for other formation markers in this well.
Surface casing will be set near the below the base of the Schrader Bluff Formation (C-40). These 300-4001
thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other
areas.
The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl
without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0
ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of
1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by:
Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi
= (12.0 ppg) * (0.052) * (2390') + 1,500 psi
= 2,990 psi
Pore Pressure = 1,081 psi
Therefore Differential = 2991 - 1081 = 1910 psi.
The internal casing pressure is conservative, since frictional losses while pumping have not been taken into
consideration. The surface and intermediate casing strings exposed to the annular pumping operations
have sufficient strength by using the 85% collapse and burst ratings listed in the following table:
Wt Connection 85% of 85% of
OD (ppf) Grade Range Type Collapse Collapse Bu rst Bu rst
9-5/8" 36 J-55 3 BTC 2,020 psi 1,717 psi 3,520 psi 2.992 psi
7" 26 L-80 3 BTC-Mod 5,410 psi 4.599 psi 7,240 psi 6,154 psi
¡""'R~ 'i Il~ .~
,1 ;;':1 ~v ' ,~
~ JlliJ
#1 '
)¡
a ,!
" 'I~ Æ_
C02-58
DRILLING FLUID PROGRAM
SPUD to Intermediate hole to 7" Production Hole
9-5/8"surface casing casing point - 8 Y2" Section - 6 1 18"
point - 12 1.4"
Density 8.8 - 9.6 ppg 9.6 - 9.8 ppg 9.1 ppg
PV 1 0 - 25 15 -20
YP 20 - 60 15 - 25 18 -25
Funnel Viscosity 100 - 200
Initial Gels 4-8 NA
10 minute gels <18 9-12
API Filtrate NC -10 cc I 30 min 4 - 12 cc/30 min (drilling) NA
HPHT Fluid Loss at 160 4.0-5.5
PH 8.5-9.0 9.0 -10.0 NA
Electrical Stability +800Vts
Oil Iwater ratio 80/20
Surface Hole:
A standard high viscosity fresh water / gel spud mud is recommended for the surface interval. Keep
flowline viscosity at ± 200 seb/qt while drilling and running casing. Reduce viscosity prior to cementing.
Maintain mud weight < 9.6 ppg' by use of solids control system and dilution where necessary.
Intermediate Hole Section:
Fresh water gel I polymer mud system. Ensure good hole cleaning by pumping regular sweeps and
maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is
penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good
filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be
important in maintaining wellbore stability.
Production Hole Section :
The horizontal production interval will be drilled with a 80/20 oil/water ratio M-I Versa-Pro mineral oil based
drill-in fluid. The base fluid will consist of high flashpoint (>200 F) mineral oil with 25% by weight calcium
chloride as the internal phase. Calcium carbonate bridging material will be added to minimize formation
damage.
J ~~ I~ ,!;f-ì f¡'!'J A I
~~ , ': ~q'i ,,"'~ r
I. "l;\~ ø R ", j 1:1,_
{
C02-58
PRESSURE INFORMATION AND CASING DESIGN
(per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2))
The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well :
Csg Setting Fracture Pore
Casing Size Depth Gradient pressure ASP Drilling
(in) MDfTVD(ft) (Ibs. I gal) (psi) (psi)
16 114/114 10.9 52 53
95/8 3104 I 2390 14.5 1081 1563
7" 12306 I 7227 16.0 3270 2563
N/A 16306 I 7272 16.0 3290 N/A
. NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi.
PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP)
ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas
gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as
follows:
1) ASP = [(FG x 0.052) - 0.1]0
Where: ASP = Anticipated Surface pressure in psi
FG = Fracture gradient at the casing seat in Ib/gal
0.052 = Conversion from Ib./gal to psi/ft
0.1 = Gas gradient in psi/ft
D = true Vertical depth of casing seat in ft RKB
OR
2) ASP = FPP - (0.1 x D)
Where; FPP = Formation Pore Pressure at the next casing point
ASP CALCULATIONS
1. Drilling below conductor casing (16")
ASP = [(FG x 0.052) - 0.1] 0
= [(10.9 x 0.052) - 0.1] x 114 = 53 psi
OR
ASP = FPP - (0.1 x D)
= 1081 - (0.1 x 2390') = 842 psi
2. Drilling below surface casing (9 5/8")
ASP = [(FG x 0.052) - 0.1] 0
= [(14.5 x 0.052) - 0.1] x 2390 = 1563 psi
OR
ASP = FPP - (0.1 x D)
= 3270 - (0.1 x 7227') = 2547 psi
3. Drilling below intermediate casing (7")
ASP = FPP - (0.1 x D)
= 3290 - (0.1 x 7272') = 2563 psi
OR; ;¡ I~L
¡'I
"
Colville River Field
CD2-58 Production Well Completion Plan
j"
I-
I
'L
-
-
Updated 5/06/2003
.,~n=a=R~~:¡1 j
-II""
16" Conductor to 114'
3-%" x 4-%" cross-over, 2 jts below 4-%Ohanger
3-1/2" Camco TRM-4E SSSV Nipple (2.813" 10) at 2000' TVD=2395' MD
-2.8·j 3" X-Over
-Single 1j.¡"xO.049" sls control line
...
9-5/8" 36 ppf J-55 BTC
.. Su rface Casing
@ 3104' MD / 2390' TVD
cemented to surface
~J
Camco KBG-2 GLM (2.867" ID)
at 3400' TVD for
E Dummy with 1" BK-2 Latch
3-1/2" 9.3 ppf L-80 1ST Mod. R3
tubing run wjth Jet Lube Run'n'Seal
pipe dope
Gi;.<.J
Camco KBG-2 GLM (2.867" ID)
at 5700' TVD for
E Dummy with 1" BK-2 Latch
Camco KBG-2 GLM (2.867" ID)
2 joints above sliding sleeve
E Dummy with 1" BK-2 Latch
/'
Packer Fluid mix:
Diesel in tubing and annulus
Completion MId. TVD
Tubing Hanger 32' 32'
4-%" 12.6 #/ft 1ST-Mod Tubing (2)
Crossover
3-1/2", 9.3#/ft, 1ST-Mod Tubing
Camco SAL-O SSSV Nipple 2395' 2000'
3-1/2", 9.3#/ft, 1ST-Mod Tubing
Camco KSG-2 GLM (2.867" 10) 4940' 3400'
3-1/2", 9.3#/ft, 1ST-Mod Tubing
Camco KSG-2 GLM (2.867" 10) 9121' 5700'
3-1/2", 9.3#/ft, 1ST-Mod Tubing
Camco KBG-2 GLM (2.867" 10) 11300' 6898'
3-1/2" tubing joints (2)
Baker 3-1/2" CMPA sliding sleeve 11400' 6954'
wI 2.81 " X Profile
3-1/2" tubing joint (2)
Baker S3 Packer 11500' 7008'
with millout extension
3-1/2" tubing joints (2)
HES "XN" (2.75" ID)-62.76º inc 11 600' 7055'
3-1/2" 10' pup joint
WEG 11612' 7060'
Baker 3-%" CMPA sliding sleeve with 2.81 "IXCProfile set 2 joints above SAB3 packer
Pinned for 2865 psi annular shear CW 2.81" X Profile
Baker SAB 3 Packer at +1- 11500' MD
'~, <200 TVD from top of Alpine C
····,·'·'~>"F~·...7~·T~
TOC @ +1- 11204' MD 16845' TVD
(885' MD above top Alpine C)
~
Top Alpine C at 12089' MD 17208' TVD
Well TD at
163061 MD 1
72721 TVD
7" 26 ppf L -80 STC Mod
Production Casing @ 12306' MD 17227' TVD @ 89.01 º
,A ,
r )
,'·,'~"1! '
,j ,,1!flIf)
0.".. R",;!
.~ ì.I g
Alpine, CD2-58 Well Cementing Requirements
95/8" Surface Casine run to 3104' MD 12390' TVD
Cement from 3104' MD to 2604' (500' offill) with Class G + Adds @ 15.8 PPG, and from 2604' to surface with
Arctic Set Lite 3. Assume 300% excess annular volume in permafrost and 50% excess below the permafrost
(1561' MD).
Lead slurry:
System:
Tail slurry:
System:
(2604'-1561') X 0.3132 ft3/ft X 1.5 (50% excess) = 490.0 fe below permafrost
1561' X 0.3132 ft3/ft X 4 (300% excess) = 1955.6 ft3 above permafrost
Total volume = 490.0 + 1955.6 = 2445.7 ft3 => 551 Sx @ 4.44 fe/sk
551 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.44 ft3/sk, Class G + 30% D053 thixotropic additive,
0.6% D046 antifoamer, 1.5% D079 extender, 1.5% SOOI accelerator, 50% D124 extender and 9%
BWOW1 D044 freeze suppressant
500' X 0.3132 felft X 1.5 (50% excess) = 234.9 ft3 annular volume
80' X 0.4341 ft3/ft = 34.7 fe shoe joint volume
Total volume = 234.9 + 34.7 = 269.6 fe => 230 Sx @ 1.17 ft3/sk
230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1 % SOOI accelerator @ 15.8
PPG yielding 1.17 ft3/sk
7" Intermediate Casine run to 12306' MD I 7227' TVD
Cement from 12306'MD to +/-11205' MD (885' MD above top of Alpine formation) with Class G + adds @
15.8 PPG. Assume 40% excess annular volume.
Slurry:
System:
(12306' - 11205') X 0.1268 felft X 1.4 (40% excess) = 195.4 fe annular vol.
80' X 0.2148 ft3/ft = 17.2 ft3 shoe joint volume
Total volume = 195.4+ 17.2 = 174.1 fe => 185 Sx @ 1.15 ft3/sk
185 Sx Class G + 0.2% D046 antifoamer, 0.25% D065 dispersant, 0.25% D800 retarder and 0.18%
D167 fluid loss additive @ 15.8 PPG yielding 1.15 ft31
1 By Weight Of mix Water, all other additives are BWOCUj. ~1·' ..F :{/1~ .:f
. . W·II ",~ /.
, \'.Li
:A L
ii1
"T'I';'·,~ ..
." :::I!..·.)
ß
ConocoPhillips Ala
North Sill'
Colville River Unit (CD2-Pad)
CD2-58 (wp06)
Sperry-Sun Drilling Services
Revis : 6 May, 2003
C>
:T"J
~~-:ò.-__~:]'
Proposal Report
~""~._-:.;---:z.
:~~::
~
r-
6 May, 2003
Your Ref: Generated in Planning Session (4-3-03)
Surface Coordinates: 5974214.32 N, 371741.61 E (70020' 16.0301" N, 151002'26.5443" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
__C',
Kelly Bushing: 52.00ft above Mean Sea Level
spe....l'y-5u.,
q.~..fç..b.Ij\lG·s~~ R\ij c$ 5
A HaUiburton Company
Proposal Ref: pro240
...... ···~Ph···················*II·
Conoco ..... .·1. IPS
sl=le""l'y-sul1
DR I L ~I.III~ ~ EJ=I V 15;: e 5
A Hallîburton Company
-6000 -3000
I I
SHL i2,·n HL & ~¥.3 ;::EL, SEC 2 n . , ,,,-
o------·-~------
Eastings
o
I 30,00
--------------0
End Dir, Start Sail @ 56.63' :
2167.57I1MD,1874.94I1TVD
,,,¡v..zP'ri"
9·5I8n Csg
MD: 3103.911
TVD: 2390.011
Co no coP hill ips Alaska, Inc.
Colville River Unit
Alpine (CD2 Pad)
Begin Dir @ 3.00/1001t (12-1/4' Hole) :
280.00ft MD, 280.00ft TVD
P'~~
,,,¡v..~
-3000 -
- -3000
CD2-58 (wp06)
9-518" Casing Pt... Drill out 8-112" Hole:
3103.900 MD, 2390.00tt TVD
~.p'ri"
SH~_ (;:·~4;~; f:~"-;L [~ -¡·:~~~T FEL SEG 2 - T11N - R¡~E~
¡> Begin Dir @ 3.00/100ft (12-1/4' Hole): 280.00ft ~D, 280.00ft TVD
r~Q
õ
o
o
C')
II
.r:
o
.!:Õ
o ----- --
1500 -
. -6000 - ¡¡¡
ëii
o
(j)
I
~6P'r/^
Begin Dlr @ 4 00/100ft· 114318911 MD, 6971.1011 TVD I ~
Target {Heel¡ End Dlr. Start Smi@89.0'.:.____ tl
12305,57tt MD, 7227,OOft TVD -------- _
-~~--
7" Csg Pt ... Begin 6-1/8" Hole: .
12306,oott MD, 7227.01ft TVD
(685' FNL, 893' FWL, Sec. 13- T11 N-R4E)
o
CJ
'"
&.
CP "
~
-õ
o
~
~.~P',r/^
~ _.,
o
o
g - -600L
II
.r:
o
£ (J)
0>
a; c:
ëii :.ë
o t
(j) 0
Z
C
::l:J
~~--~
-12000 -
Begin Dir @ 3.00/100ft: 12335.5711 MD, 7227.5211 TVD
End Dir, Start Sail @ 89.67": 12357.8411 MD, 7227.78t TVD
Begin Dir @ 3.00/1001t: 14755.1911 MD, 7241.1'611 TVD ,
Target (Mid-Pi) End Dk, Start Sail @ 88.88": 14781.591t M1' 7242.0011 T~/
I ._..----
Target (foe) Total Depth: 16305.88f- MD. 7271.9011 TVD
(1005' FSL. 2500' FEL, Sec. 13-T11N·R4E)
- -9000
-9000 -
~&-'>,:-.::-<,-;~
~-'-
-..~
-~-~
"'--
c_J·.':""':":::a.
r--
::J
en
:2':
N
L{)
II
OJ
~
ç£
..c:
õ..
Q)
o
~ 4500-
t
Q)
>
9-S/8in Csg
MD: 3103_911
TVD: 2390.011
!~":)
3000 -
- -1200C
.,J:'
.·.·.·,v·.,· -.'.
-~.
Reference is True North
I
-6000
I
-3000
o
I
3000
Well:
Current Well Properties
C02-58
o
I
1500
I
3000
I
4500
I
6000
Begin Oir @ 4.0'/100ft: 11431.8911 MD, 6971.1011 TVD
Targ~t (Heel) Enò Dir, Start Sail @ 89.0' : 12305.571t MD, 7227.OOIt TVD
\ 7" Csg Pt ... Begin 6-1/8" Hole: 12306.00tt MD, 7227.01ft TVD
(685' FNL, 893' FWL, Sec. 13-T11N-R4E)
; ~ Begin Dir @ 3 00/1001t: 12335 57ft MO, 7227 521t TVD
\. ~ End Oir, Start Sail @ 8967° 12357 84ft MD, 7227 78ft TVD
; ~ Begin Dir @ 300/1001t 147551911 MD, 7241 66ft TVD
'. Target (Mld-Pt) End Dlr, Start Sail @ 88.88' ;
~ 14781.S9ft MO, 7242.00ft TVO
_~Q \ , !) \'tI><fJ<J.\ ¡!) '1'<p<J.\ ..rPrJ.\/ \<9-rPrJ.\ \.pfJd"
~ ~ ~ ~ ~ ~c
Target (foe) Total Depth: 16305.88ft MD. 7271.90ft TVÓ
(1065' FSL. 2506' FEL, Sec. 13-T11N-R4E)
I I
10500 12000
7in Csg
MO: 12306.011
TVD: 7227.011
6000 -
~
0
0
10
II
.r:
0
.!:
¡¡¡
êij
u
(j) 7500 -
Horizontal Coordinates:
Ref. Global Coordinates :
Ref. Struclu'e :
Ref. Geographical Coordinates :
5974214.32 N, 371741.61 E
228.14 S, 28.03 E
70° 20' 16.0301' N, 151° 02' 26.5443' W
2143' FNL & 1493' FEL, SEC 2 - T11N - R4E
RKB Elevation:
52.00ft above Mean Sea Level
North Refererce :
Units:
True North
Feet (US SLlVey)
APPROVED Plan
I
7500
I
9000
I
13500
Scale: 1 inch = 1500ft
Drill Quest 3.03.02.002
ConocoPhillips Alaska, Inc. CD2-58 (wp06)
MD Inc Azim. SSTVD TVD NIS E/W y X DLS V.S. Comment
(ft) (Deg) (Deg) (ft) (ft) (ft) (ft) (ft) (ft) (0/10Oft) (ft)
0.00 0.00 (LaO -52.00 0.00 0.00 N 0.00 E 5974214.32 N 37174-1.61 E 0.00 0.00 SHL
280.00 0.00 0.00 228.00 280.00 0.00 N 0.00 E 5974214.32 N 371741.61 E 0.00 0.00 Begin Dir @ 3.00/100ft (12-1/4" Hole)
1672.01 41.76 165.93 1500.00 1552.00 470.66 S 117.98E 5973741.71 N 371851.52 E 3.00 470.75 Permafrost (est)
2167.57 56.63 165.93 1822.94 1874.94 833.49 S 208.92 E 5973377.38 N 371936.25 E 3.00 833.65 End Dir; Start Sail
2762.14 56.63 165.93 2150.00 2202.00 1315.11 S 329.65 E 5972893.76 N 372048.72 E 0.00 1315.37 C-40 ~-::..
3103.90 56.63 165.93 2338.00 2390.00 1591.96 S 399.04 E 5972615.77 N 372113.36 E 0.00 1592.27 9-5/8" Casing pt n. Drill out 8-1/2" Hole
3116.63 56.63 165.93 2345.00 2397.00 1602.27 S 401.63 E 5972605.42 N 372115.77 E 0.00 1602.58 C-30
3800.16 56.63 165.93 2721.00 2773.00 2155.96 S 540.41 E 5972049.43 N 372245.07 E 0.00 2156.38 C-20
5747.13 56.63 165.93 3792.00 3844.00 3733.11 S 935.74 E 5970465.75 N 372613.36 E 0.00 3733.82 K-3 Marker
6108.90 56.63 165.93 3991.00 4043.00 4026.15 S 1009.20 E 5970171.49 N 372681.80 E 0.00 4026.92 Basal K-3 SS
6163.43 56.63 165.93 4021 .00 4073.00 4070.33 S 1020.27 E 5970127.13 N 372692.11 E 0.00 4071.11 K-2 Marker
6332.50 56.63 165.93 4114.00 4166.00 4207.28 S 1054.60 E 5969989.62 N 372724.09 E 0.00 4208.09 Base K2 Sequence
9050.26 56.63 165.93 5609.00 5661.00 6408.81 S 1606.43 E 5967778.98 N 373238.19 E 0.00 6410.03 Albian-97
0 10002.84 56.63 165.93 6133.00 6185.00 7180.44 S 1799.85 E 5967004.14 N 373418.38 E 0.00 7181.81 Albian-96
::0 11100.86 56.63 165.93 6737.00 6789.00 8069.89 S 2022.80 E 5966111.02 N 373626.09 E 0.00 8071.43 Top HRZ
~""';.--:.~~ 11335.37 56.63 165.93 6866.00 6918.00 8259.85 S 2070.42 E 5965920.26 N 373670.45 E 0.00 8261.43 Base HRZ
c-} 11411. 72 56.63 165.93 6908.00 6960.00 8321.70 S 2085.92 E 5965858.16 N 373684.89 E 0.00 8323.29 K-1 Marker
~=:o..~~ 11431.89 56.63 165.93 6919.09 6971.09 8338.04 S 2090.02 E 5965841 .76 N 373688.71 E 0.00 8339.63 Begin Dir @ 4.00/100ft
"~:...:-'--~~ 11487.77 58.66 164.82 6949.00 7001.00 8383.71 S 2101.94 E 5965795.89 N 373699.84 E 4.00 8385.53 Kuparuk
~-._~ 11574.40 61.82 163.20 6992.00 7044.00 8455.99 S 2122.67 E 5965723.26 N 373719.34 E 4.00 8459.06 LCU
.""C~ 11883.51 73.24 158.05 7110.00 7162.00 8724.71 S 2217.74 E 5965452.95 N 373809.80 E 4.00 8740.88 Miluveach A
r--- 11954.93 75.90 156.97 7129.00 7181.00 8788.32 S 2244.08 E 5965388.91 N 373835.04 E 4.00 8809.40 Alpine D
12089.31 80.91 154.99 7156.00 7208.00 8908.50 S 2297.67 E 5965267.82 N 373886.57 E 4.00 8940.66 Alpine C
12305.57 89.00 151.90 7175.00 7227.00 9100.99 S 2393.92 E 5965073.72 N 373979.52 E 4.00 9155.79 Target (Heel) ... End Dir; Start Sail
12306.00 89.00 151.90 7175.01 7227.01 9101.37 S 2394.12 E 5965073.33 N 373979.71 E 0.00 9156.23 7" Csg pt ... Begin 6-1/8" Hole
12335.57 89.00 151.90 7175.52 7227.52 9127.45 S 2408.05 E 5965047.02 N 373993.19 E 0.00 9185.79 Begin Dir @ 3.00/100ft
12357.84 89.67 151.90 7175.78 7227.78 9147.10 S 2418.54 E 5965027.19 N 374003.34 E 3.00 9208.06 End Dir; Start Sail
14755.19 89.67 151.90 7189.67 7241.67 11261.79 S 3547.77 E 5962893.50 N 375096.24 E 0.00 11605.37 Begin Dir @ 3.00/100ft
14781.59 88.88 151.90 7190.00 7242.00 11285.08 S 3500.21 E 5962870.00 N 375108.28 E 3.00 11631.77 Target (Mid-Pt) ... End Dir; Start Sail
16305.88 88.88 151.90 7219.90 7271.90 12629.43 S 4278.04 E 5961513.57 N 375803.01 E 0.00 13155.76 Target (Toe) ... Total Depth
OrillQuest 3.03.02.002
Page 2 of 11
6 May, 2003 - 19:15
Sperry-Sun Drilling Services
Proposal Report for Plan: C02-58 - C02-58 (wp06)
Your Ref: Generated in Planning Session (4-3-03)
Revised: 6 May, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastin9s Northin9s Räte Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) fO/1ooft)
0.00 0.000 0.000 -52.00 0.00 0.00 N 0.00 E 5974214.32 N 0.00 SHL (2143' FNL & 1493' FEL, SEC 2
T11 N - R4E)
100.00 0.000 0.000 48.00 100.00 0.00 N 0.00 E 37]741.ö1 t:. 0.000 0.00
200.00 0.000 0.000 148.00 200.00 0.00 N 0.00 E 3717:41.61 E 0.000 0.00
280.00 0.000 0.000 228.00 280.00 0.00 N ,ª,oo 371741.61 E 0.000 0.00 Begin Dir @ 3.0°/1 OOft (12-1/4"~!~)
. 280.00ft MD, 280.00ft TVD
300.00 0.600 165.928 248.00 300.00 0.10 S 0.03 E N 371741.63 E 3.000 0.10
400.00 3.600 165.928 347.92 399.92 0.92 5974210.65 N 371742.46 E 3.000 3.66
500.00 6.600 165.928 447.51 499.51 3.08 E 5974201.99 N 371744.48 E 3.000 12.28
600.00 9.600 165.928 546.50 598.50 6.50 E 5974188.27 N 371747.67 E 3.000 25.95
700.00 12.600 165.928 644.62 696.62 11.18 E 5974169.52 N 371752.03 E 3.000 44.62
800.00 15.600 165.928 741 .60 793.60 17.11 E 5974145.79 N 371757.55 E 3.000 68.26
<::) 900.00 18.600 165.928 837.17 889.17 24.25 E 5974117.16 N 371764.21 E 3.000 96.78
=tJ 1000.00 21 .600 165.928 931.07 983.07 32.61 E 5974083.69 N 371771.99 E 3.000 130.12
1100.00 24.600 165.928 1023.04 1075.04 42.15 E 5974045.48 N 371780.88 E 3.000 168.18
~~::-lE'} 1200.00 27.600 165.928 1112.83 1164.83 52.84 E 5974002.63 N 371790.84 E 3.000 210.85
~·.·h 1300.00 30.600 1200.20 1252.20 64.67 E 5973955.27 N 371801 .85 E 3.000 258.03
~J: :J>
1400.00 33.600 1~f}4.90 1336.90 309.52 S 77.58 E 5973903.52 N 371813.89 E 3.000 309.58
1500.00 36.600 1366.71 1418.71 365.29 S 91 .56 E 5973847.52 N 371826.91 E 3.000 365.36
o}.~ 1600.00 39.600 1445.39 1497.39 425.14 S 106.56 E 5973787.42 N 371840.89 E 3.000 425.22
r-- 1672.01 41.760 1500.00 1552.00 470.66 S 117.98 E 5973741.71 N 371851.52 E 3.000 470.75 Permafrost (est)
1700.00 42.600 1520.74 1572.74 488.89 S 122.55 E 5973723.40 N 371855.78 E 3.000 488.99
·165.928 1592.54 1644.54 556.39 S 139.46 E 5973655.63 N 371871.54 E 3.000 556.49
165.928 1660.61 1712.61 627.44 S 157.27 E 5973584.29 N 371888.13 E 3.000 627.56
165.928 1724.74 1776.74 701 .84 S 175.92 E 5973509.57 N 371905.50 E 3.000 701.98
165.928 1784.78 1836.78 779.40 S 195.37 E 5973431.69 N 371923.62 E 3.000 779.55
165.928 1822.94 1874.94 833.49 S 20a.92 E 5973377.38 N 371936.25 E 3.000 833.65 End Dir, Start Sail @ 56.63° :
2167 .57ftM 0,187 4.94ftTVD
2200.00 56.627 165.928 1840.78 1892.78 859.76 S 215.51 E 5973351.00 N 371942.38 E 0.000 859.92
2300.00 56.627 165.928 1895.79 1947.79 940.76 S 235.81 E 5973269.66 N 371961.30 E 0.000 940.94
2400.00 56.627 165.928 1950.80 2002.80 1021.77 S 256.12 E 5973188.32 N 371980.21 E 0.000 1021.96
2500.00 56.627 165.928 2005.80 2057.80 11 02.77 S 276.42 E 5973106.98 N 371999.13 E 0.000 1102.98
2600.00 56.627 165.928 2060.81 2112.81 1183.78 S 296.73 E 5973025.64 N 372018.05 E 0.000 1184.00
DrillQuest 3.03.02.002
Page 3 of 11
6 May, 2003 - 19:15
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-58 - CD2-58 (wp06)
Your Ref: Generated in Planning Session (4-3-03)
Revised: 6 May, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates DÓg'fi!g Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) ("/100ft)
2700.00 56.627 165.928 2115.82 2167.82 1264.78 S 317.03 E 5972944.30 N <:J.OOO 1265.02
2762.14 56.627 165.928 2150.00 2202.00 1315.11 S 329.65 E 59728~~.76 N 0.000 1315.37 C-40
2800.00 56.627 165.928 2170.83 2222.83 1345.79 S 337.34 E 5972862.96 N 0.000 1346.04
2900.00 56.627 165.928 2225.84 2277.84 1426.79 S 357.64 E 0.000 1427.06
3000.00 56.627 165.928 2280.85 2332.85 1507.80 S 3'4't'¡,,94 0.000 1508.08
3100.00 56.627 165.928 2335.85 2387.85 1588.80 S 372112.63 E 0.000 1589.10
3103.90 56.627 165.928 2338.00 2390.00 1591.96 S 372113.36 E 0.000 1592.27 9-5/8" Casing Pt ... Drill out 8-1/2" HolE
3103.90ft MD, 2390.00ftTVD
9 5/8in Casing
3116.63 56.627 165.928 2345.00 .63 E 5972605.42 N 372115.77 E 0.000 1602.58 C-30
3200.00 56.627 165.928 2390.86 418.55 E 5972537.60 N 372131.54 E 0.000 1670.12
3300.00 56.627 165.928 2445.87 438.86 E 5972456.26 N 372150.46 E 0.000 1751.15
3400.00 56.627 165.928 2500.88 459.16 E 5972374.92 N 372169.37 E 0.000 1832.17
a 3500.00 56.627 165.928 2555.89 479.47 E 5972293.58 N 372188.29 E 0.000 1913.19
:J'j 3600.00 56.627 165.928 2610.90 499.77 E 5972212.24 N 372207.21 E 0.000 1994.21
3700.00 56.627 165.928 2665.90 520.08 E 5972130.90 N 372226.12 E 0.000 2075.23
~.- -. 3800.00 56.627 165.928 2720.91 540.38 E 5972049.56 N 372245.04 E 0.000 2156.25
C":) 5972049.43 N 372245.07 E 0.000 2156.37 C-20
,,,,,,,,,,: ." 3800.16 56.627 165.928 2*e~ .00 2773.00 2155.96 S 540.41 E
5-...:..::-_._ 3900.00 56.627 165.928 2775.92 2827.92 2236.84 S 560.69 E 5971968.22 N 372263.96 E 0.000 2237.27
~.._~
'-'~ 4000.00 56.627 165.928 2830.93 2882.93 2317.85 S 580.99 E 5971886.88 N 372282.87 E 0.000 2318.29
....,-~-
J:_~~ 4100.00 56.627 165.928 2885.94 2937.94 2398.85 S 601.30 E 5971805.54 N 372301 .79 E 0.000 2399.31
;--. 4200.00 56.627 165.928 2940.95 2992.95 2479.86 S 621.60 E 5971724.20 N 372320.70 E 0.000 2480.33
56.627 165.928 2995.96 3047.96 2560.86 S 641.91 E 5971642.86 N 372339.62 E 0.000 2561.35
56.627 165.928 3050.96 3102.96 2641.86 S 662.21 E 5971561.52 N 372358.54 E 0.000 2642.37
56.627 165.928 3105.97 3157.97 2722.87 S 682.52 E 5971480.17 N 372377.45 E 0.000 2723.39
56.627 165.928 3160.98 3212.98 2803.87 S 702.82 E 5971398.83 N 372396.37 E 0.000 2804.41
56.627 165.928 3215.99 3267.99 2884.88 S 723.12 E 5971317.49 N 372415.29 E 0.000 2885.43
4800.00 56.627 165.928 3271.00 3323.00 2965.88 S 743.43 E 5971236.15 N 372434.20 E 0.000 2966.45
4900.00 56.627 165.928 3326.01 3378.01 3046.89 S 763.73 E 5971154.81 N 372453.12 E 0.000 3047.47
5000.00 56.627 165.928 3381.01 3433.01 3127.89 S 784.04 E 5971073.47 N 372472.03 E 0.000 3128.49
5100.00 56.627 165.928 3436.02 3488.02 3208.90 S 804.34 E 5970992.13 N 372490.95 E 0.000 3209.51
5200.00 56.627 165.928 3491 .03 3543.03 3289.90 S 824.65 E 5970910.79 N 372509.87 E 0.000 3290.53
Dri//Quest 3.03.02.002
Page 4 of 11
6 May, 2003 - 19:15
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-58 - CD2-58 (wp06)
Your Ref: Generated in Planning Session (4-3-03)
Revised: 6 May, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates DÓg~Øg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (Y1OOft)
5300.00 56.627 165.928 3546.04 3598.04 3370.91 S 844.95 E 0.000 3371 .55
5400.00 56.627 165.928 3601 .05 3653.05 3451.91 S 865.26 E 0.000 3452.57
5500.00 56.627 165.928 3656.06 3708.06 3532.92 S 885.56 E 0.000 3533.59
5600.00 56.627 165.928 3711.06 3763.06 3613.92 S 905.87 E 0.000 3614.61
5700.00 56.627 165.928 3766.07 3818.07 3694.93 S 926:.17 0.000 3695.63 ~"--
5747.13 56.627 165.928 3792.00 3844.00 3733.11 S N 372613.36 E 0.000 3733.82 K-3 Marker
5800.00 56.627 165.928 3821 .08 3873.08 3775.93 S N 372623.36 E 0.000 3776.65
5900.00 56.627 165.928 3876.09 3928.09 38,~,94 S 5970341.41 N 372642.28 E 0.000 3857.67
6000.00 56.627 165.928 3931.10 3983.1 0 393Ìi~~4 S 5970260.07 N 372661.20 E 0.000 3938.69
6100.00 56.627 165.928 3986.11 4038.11 4018.95 S 5970178.73 N 372680.11 E 0.000 4019.71
6108.90 56.627 165.928 3991 .00 4043.00 4026.15 S 1009.20 E 5970171.49 N 372681 .80 E 0.000 4026.92 Basal K-3 SS
6163.43 56.627 165.928 4021 .00 4073.00 4070.33 S 1020.27 E 5970127.13 N 372692.11 E 0.000 4071.11 K-2 Marker
6200.00 56.627 165.928 4041.12 4093.12 4099.95 S 1027.70 E 5970097.39 N 372699.03 E 0.000 4100.74
0 6300.00 56.627 165.928 4096.12 4148.12 4180.96 S 1048.00 E 5970016.05 N 372717.95 E 0.000 4181.76
::U 6332.50 56.627 165.928 4114.00 4166.00 4207.28 S 1 054.60 E 5969989.62 N 372724.09 E 0.000 4208.09 Base K2 Sequence
~-::"_'- 6400.00 56.627 165.928 4151.13 4203.13 4261 .96 S 1068.30 E 5969934.71 N 372736.86 E 0.000 4262.78
6500.00 56.627 165.928 \i~p6.14' 4258.14 4342.97 S 1088.61 E 5969853.37 N 372755.78 E 0.000 4343.80
6600.00 56.627 165.928 4~J)1 .15 4313.15 4423.97 S 1108.91 E 5969772.03 N 372774.69 E 0.000 4424.82
6700.00 56.627. 165.928 4316.16 4368.16 4504.98 S 1129.22 E 5969690.69 N 372793.61 E 0.000 4505.84
6800.00 56.627 165.928 4371.17 4423.17 4585.98 S 1149.52 E 5969609.35 N 372812.53 E 0.000 4586.86
~ 6900.00 56.627 165.928 4426.17 4478.17 4666.99 S 1169.83 E 5969528.01 N 372831.44 E 0.000 4667.88
7000.00",t,56.)ß7;:/165.928 4481.18 4533.18 4747.99 S 1190.13 E 5969446.67 N 372850.36 E 0.000 4748.90
7100.00", 56.627 165.928 4536.19 4588.19 4829.00 S 1210.44 E 5969365.33 N 372869.28 E 0.000 4829.92
7200.00W? 56.627 165.928 4591 .20 4643.20 4910.00 S 1230.74 E 5969283.99 N 372888.19 E 0.000 4910.94
7300.00 56.627 165.928 4646.21 4698.21 4991 .01 S 1251.05 E 5969202.65 N 372907.11 E 0.000 4991 .96
7400.00 56.627 165.928 4701.22 4753.22 5072.01 S 1271.35 E 5969121.31 N 372926.02 E 0.000 5072.98
7500.00 56.627 165.928 4756.22 4808.22 5153.02 S 1291.66 E 5969039.96 N 372944.94 E 0.000 5154.00
7600.00 56.627 165.928 4811.23 4863.23 5234.02 S 1311.96 E 5968958.62 N 372963.86 E 0.000 5235.02
7700.00 56.627 165.928 4866.24 4918.24 5315.03 S 1332.27 E 5968877.28 N 372982.77 E 0.000 5316.04
7800.00 56.627 165.928 4921 .25 4973.25 5396.03 S 1352.57 E 5968795.94 N 373001 .69 E 0.000 5397.06
OrillQuest 3.03.02.002
Page 5 of 11
6 May, 2003 - 19:15
Sperry-Sun Drilling Services
Proposal Report for Plan: C02-58 - C02-58 (wp06)
Your Ref: Generated in Planning Session (4-3-03)
Revised: 6 May, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates DOgleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Ráte Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) C'/l00ft)
7900.00 56.627 165.928 4976.26 5028.26 5477.04 S 1372.88 E 5968714.60 N 0.000 5478.08
8000.00 56.627 165.928 5031.27 5083.27 5558.04 S 1393.18 E 5968633.26 N 0.000 5559.10
8100.00 56.627 165.928 5086.28 5138.28 5639.05 S 1413.48 E 5968551.92 N 0.000 5640.12
8200.00 56.627 165.928 5141.28 5193.28 5720.05 S 1433.79 E 5968470.58 N 0.000 5721.14
8300.00 56.627 165.928 5196.29 5248.29 5801 .06 S 14fut.D9 0.000 5802.16
8400.00 56.627 165.928 5251 .30 5303.30 5882.06 S 1474.40 E N 373115.19 E 0.000 5883.18
8500.00 56.627 165.928 5306.31 5358.31 5963.07 S 1494.70 E N 373134.10 E 0.000 5964.20
8600.00 56.627 165.928 5361.32 5413.32 6044.07 S 1515.01 E 5968145.22 N 373153.02 E 0.000 6045.22
8700.00 56.627 165.928 5416.33 5468.33 6125¡¡08 S .'\J 535.31 E 5968063.88 N 373171.93 E 0.000 6126.24
8800.00 56.627 165.928 5471.33 5523.33 6206.08 S 'tMiJ555.62 E 5967982.54 N 373190.85 E 0.000 6207.26
8900.00 56.627 165.928 5526.34 5578.34 6287.08 S 1575.92 E 5967901 .20 N 373209.77 E 0.000 6288.28
9000.00 56.627 165.928 5581.35 5633.35 6368.09 S 1596.23 E 5967819.86 N 373228.68 E 0.000 6369.31
9050.26 56.627 165.928 5609.00 5661.00 6408.81 S 1606.43 E 5967778.98 N 373238.19 E 0.000 6410.03 Albian-97
C) 9100.00 56.627 165.928 5636.36 5688.36 6449.09 S 1616.53 E 5967738.52 N 373247.60 E 0.000 6450.33
9200.00 56.627 165.928 5691.37 5743.37 6530.10 S 1636.84 E 5967657.18 N 373266.52 E 0.000 6531.35
~J 9300.00 56.627 165.928 5746.38 5798.38 6611.10 S 1657.14 E 5967575.84 N 373285.43 E 0.000 6612.37
~·~-'i~
£~".,.~~'- 9400.00 56.627 165_928; ii]!, '.01 .38""' 5853.38 6692.11 S 1677.45 E 5967494.50 N 373304.35 E 0.000 6693.39
~.:: .) 9500.00 56.627 165.928 5156.39 5908.39 6773.11 S 1697.75 E 5967413.16 N 373323.26 E 0.000 6774.41
~'-"_.-. .--"- 9600.00 56.627 165.928 5911 .40 5963.40 6854.12 S 1718.06 E 5967331 .82 N 373342.18 E 0.000 6855.43
9700.0g1i .......... 56.627 165.928 5966.41 6018.41 6935.12 S 1738.36 E 5967250.48 N 373361.10 E 0.000 6936.45
ff~- 9800 .OG¡\~~~?7\:165 .928 6021.42 6073.42 7016.13 S 1758.66 E 5967169.14 N 373380.01 E 0.000 7017.47
ç¡ç¡oo .orj'¡5R~B2i7im!¡'¡¡¡ 65.928 6076.43 6128.43 7097.13 S 1778.97 E 5967087.80 N 373398.93 E 0.000 7098.49
,u165.928 6131.44 6183.44 7178.14 S 1799.27 E 5967006.46 N 373417.85 E 0.000 7179.51
165.928 6133.00 6185.00 7180.44 S 1799.85 E 5967004.14 N 373418.38 E 0.000 7181.81 Albian-96
165.928 6186.44 6238.44 7259.14 S 1819.58 E 5966925.12 N 373436.76 E 0.000 7260.53
10200.00 56.627 165.928 6241 .45 6293.45 7340.15 S 1839.88 E 5966843.78 N 373455.68 E 0.000 7341 .55
10300.00 56.627 165.928 6296.46 6348.46 7421.15 S 1860.19 E 5966762.44 N 373474.59 E 0.000 7422.57
10400.00 56.627 165.928 6351.47 6403.47 7502.16 S 1880.49 E 5966681 .10 N 373493.51 E 0.000 7503.59
10500.00 56.627 165.928 6406.48 6458.48 7583.16 S 1900.80 E 5966599.75 N 373512.43 E 0.000 7584.61
10600.00 56.627 165.928 6461 .49 6513.49 7664.17 S 1921.10 E 5966518.41 N 373531.34 E 0.000 7665.63
Sperry-Sun Drilling Services
Proposal Report for Plan: C02-58 - C02-58 (wp06)
Your Ref: Generated in Planning Session (4-3-03)
Revised: 6 May, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dog~g,.Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings EastinašII¡ Ràtê Section Comment
(ft) (ft) (ft) (ft) (ft) (ft)
10700.00 56.627 165.928 6516.49 6568.49 7745.17 S 7746.65
10800.00 56.627 165.928 6571 .50 6623.50 7826.18 S 0.000 7827.67
10900.00 56.627 165.928 6626.51 6678.51 7907.18 S 0.000 7908.69
11000.00 56.627 165.928 6681 .52 6733.52 7988.19 S 0.000 7989.71
11100.00 56.627 165.928 6736.53 6788.53 8069.19 S 0.000 8070.73
8069.89 S --
11100.86 56.627 165.928 6737.00 6789.00 1.01 N 373626.09 E 0.000 8071 .43 Top HRZ
11200.00 56.627 165.928 6791 .54 6843.54 8150.20 S N 373644.84 E 0.000 8151.75
11300.00 56.627 165.928 6846.54 6898.54 8231..20 S 5965949.03 N 373663.76 E 0.000 8232.77
11335.37 56.627 165.928 6866.00 6918.00 825!1H85 S 5965920.26 N 373670.45 E 0.000 8261.43 Base H RZ
11400.00 56.627 165.928 6901 .55 6953.55 8312.21 S 5965867.69 N 373682.67 E 0.000 8313.79
11411 .72 56.627 165.928 6908.00 6960.00 8321.70 S 2085.92 E 5965858.16 N 373684.89 E 0.000 8323.29 K-1 Marker
11431 .89 56.627 165.928 6919.09 6971.09 8338.04 S 2090.01 E 5965841 .75 N 373688.70 E 0.000 8339.63 Begin Oir @ 4.00/100ft: 11431.89ft
MD, 6971.10ft TVD
a 11487.77 58.657 164.821 6949.00 7001100 8383.71 S 2101.94 E 5965795.89 N 373699.84 E 4.000 8385.53 Kuparuk
11500.00 59.103 164.585 6955.32 700'7:1q? 8393.81 S 2104.70 E 5965785.74 N 373702.43 E 4.000 8395.74
::C1 11574.40 61.823 163.195 6992.00 7044.00 8455.99 S 2122.67 E 5965723.26 N 373719.34 E 4.000 8459.06 LCU
--..<::L_-.. 11600.00 62.761 162.734 7003.90 7055.90 8477.65 S 2129.31 E 5965701.49 N 373725.61 E
~- ~ 4.000 8481.30
11700.00 66.443 161.001 7046.79 7098.79 8563.48 S 2157.44 E 5965615.19 N 373752.26 E 4.000 8570.25
11800.00 70.142 159,363 7083.77 7135.77 8650.86 S 2188.95 E 5965527.29 N 373782.27 E 4.000 8662.17
~_¡J. 11883.51 73.242 158.053 7110.00 7162.00 8724.71 S 2217.74 E 5965452.95 N 373809.79 E 4.000 8740.88 Miluveach A
- . 11900.00 73.855 157.799 7114.67 7166.67 8739.37 S 2223.68 E 5965438.19 N 373815.49 E 4.000 8756.61
__~~J
rf~-'~ 11954.93 75.900 156.966 7129.00 7181.00 8788.32 S 2244.07 E 5965388.91 N 373835.04 E 4.000 8809.40 Alpine 0
12000.00 77.580 156.294 7139.34 7191.34 8828.58 S 2261.48 E 5965348.35 N 373851.75 E 4.000 8853.11
12089.31 80.913 154.986 7156.00 7208.00 8908.50 S 2297.67 E 5965267.82 N 373886.57 E 4.000 8940.65 Alpine C -
12100.00 81.313 154.831 7157.65 7209.65 8918.06 S 2302.15 E 5965258.18 N 373890.88 E 4.000 8951.20
12200.00 85.051 153.397 7169.52 7221.52 9007.37 S 2345.49 E 5965168.15 N 373932.70 E 4.000 9050.40
12300.00 88.792 151.979 7174.89 7226.89 9096.08 S 2391.30 E 5965078.67 N 373976.98 E 4.000 9150.23
12305.57 89.000 151.900 7175.00 7227.00 9100.99 S 2393.92 E 5965073.72 N 373979.52 E 4.000 9155.79 Target (Heel) End Dir, Start Sail @
89.0°: 12305.57ft MD, 7227.00ftTVD
Target - C02-58 Heel T1, Current
Target
12306.00 89.000 151.900 7175.01 7227.01 9101 .37 S 2394.12 E 5965073.33 N 373979.71 E 0.000 9156.23 7" Csg Pt ... Begin 6-1/8" Hole:
12306.00ft MD, 7227.01ft TVO (685'
FNL, 893' FWL, Sec. 13-T11 N-R4E)
7in Casing
6 May, 2003 - 19:15 Page 6 of 11 OrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-58 - CD2-58 (wp06)
Your Ref: Generated in Planning Session (4-3-03)
Revised: 6 May, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dog!!g . Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings . Ram Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
12335.57 89.000 151.900 7175.52 7227.52 9127.45 S 2408.05 E 5965047.02 N 373993.19 E '''Q.OOO 9185.79 Begin Dir @ 3.00/100ff : 12335.57ft
MD, 7227.52ft TVD
12357.84 89.668 151.898 7175.78 7227.78 9147.10 S 2418.54 E 59650~Z.19 N E 3.000 9208.06 End Dir, Start Sail @ 89.67° :
12357.84ft MD, 7227.78ft TVD
12400.00 89.668 151.898 7176.03 7228.03 9184.28 S 5964989.67 N 374022.56 E 0.000 9250.22
12500.00 89.668 151.898 7176.61 7228.61 9272.49 S 5964900.67 N 374068.15 E 0.000 9350.22 .-.
12600.00 89.668 151.898 7177.18 7229.18 9360.70 S 5964811.67 N 374113.74 E 0.000 9450.22
12700.00 89.668 151.898 7177.76 7229.76 9448.91 S '''5964722.67 N 374159.33 E 0.000 9550.21
12800.00 89.668 151.898 7178.34 7230.34 S 5964633.66 N 374204.91 E 0.000 9650.21
12900.00 89.668 151.898 7178.92 7230.92 9625.33 S 5964544.66 N 374250.50 E 0.000 9750.21
13000.00 89.668 151.898 7179.50 7231 .50 9713.54 S 5964455.66 N 374296.09 E 0.000 9850.21
13100.00 89.668 151.898 7180.08 7232.08 9801.75 S 5964366.66 N 374341.68 E 0.000 9950.21
13200.00 89.668 151.898 7180.66 7232.66 9889.96 S 5964277.65 N 374387.27 E 0.000 10050.21
13300.00 89.668 151.898 7181.24 7233.24 9978.17 S 5964188.65 N 374432.85 E 0.000 10150.20
c:> 13400.00 89.668 151.898 7181.82 723qi~? 10066.38 S 2909.43 E 5964099.65 N 374478.44 E 0.000 10250.20
=r:) 13500.00 89.668 151.898 7182.40 7234:40 10154.59 S 2956.54 E 5964010.65 N 374524.03 E 0.000 10350.20
13600.00 89.668 151.898 7182.98 7234.98 10242.80 S 3003.64 E 5963921.64 N 374569.62 E 0.000 10450.20
1;;. 13700.00 89.668 151.898 7183.55 7235.55 10331.01 S 3050.74 E 5963832.64 N 374615.20 E 0.000 10550.20
) 13800.00 89.668 151,898 7184.13 7236.13 10419.22 S 3097.85 E 5963743.64 N 374660.79 E 0.000 10650.20
13900.00 89.668 151 .898 7184.71 7236.71 10507.43 S 3144.95 E 5963654.64 N 374706.38 E 0.000 10750.19
14000.00 89.668 151.898 7185.29 7237.29 10595.64 S 3192.05 E 5963565.64 N 374751.97 E 0.000 10850.19
~__ ~ .......:.i 14100.00 89.668 151.898 7185.87 7237.87 10683.85 S 3239.16 E 5963476.63 N 374797.56 E 0.000 10950.19
r~~ 14200.00 89.668 151.898 7186.45 7238.45 10772.06 S 3286.26 E 5963387.63 N 374843.14 E 0.000 11050.19
14300.00 89.668 151.898 71 87.03 7239.03 . 10860.27 S 3333.36 E 5963298.63 N 374888.73 E 0.000 11150.19
~
14400.00 89.668 151.898 7187.61 7239.61 1 0948.48 S 3380.47 E 5963209.63 N 374934.32 E 0.000 11250.19
14500.00 89.668 151.898 7188.19 7240.19 11036.69 S 3427.57 E 5963120.62 N 374979.91 E 0.000 11350.18
14600.00 89.668 151.898 7188.77 7240.77 11124.89 S 3474.68 E 5963031.62 N 375025.50 E 0.000 11450.18
14700.00 89.668 151.898 7189.34 7241 .34 11213.10 S 3521.78 E 5962942.62 N 375071 .08 E 0.000 11550.18
14755.19 89.668 151.898 7189.66 7241 .66 11261.79 S 3547.77 E 5962893.50 N 375096.24 E 0.000 11605.37 Begin Dir @ 3.00/100ft : 14755.19ft
MD, 7241.66ft TVD
14781.59 88.876 151.900 7190.00 7242.00 11285.08 S 3560.21 E 5962870.00 N 375108.28 E 3.000 11631.77 Target (Mid-Pt) End Dir, Start Sail @
88.88° : 14781.59ft MD, 7242.00ft TV
Target - C02-58 (Mid-Pt) T2, Current
Target
14800.00 88.876 151.900 7190.36 7242.36 11301.31 S 3568.88 E 5962853.62 N 375116.67 E 0.000 11650.17
14900.00 88.876 151.900 7192.32 7244.32 11389.50 S 3615.97 E 5962764.63 N 375162.25 E 0.000 11750.15
6 May, 2003 - 19:15 Page 7 of 11 DrillQuest 3.03.02.002
OrillQuest 3.03.02.002
--'
Target (Toe) Total Depth: 16305.88ft
MD, 7271.90ft TVD (1065' FSL, 2506'
FEL, Sec. 13-T11 N-R4E)
6.-1/8" Open Hole
Target - CD2-58 Toe T3, Current Targ
"_/
Comment
13049.90
13149.88
13155.76
12550.00
12649.98
12749.96
12849.94
12949.92
12050.10
12150.08
12250.06
12350.04
12450.02
11850.13
11950.12
Vertical
.. Section
North Slope, Alaska
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Page 8 of 11
6 May, 2003 - 19:15
The Along Hole Displacement is 13419.15ft, the Planned Tortuosity is 1.077°/1 OOft and the Directional Difficulty Index is 6.2.
Based upon Minimum Curvature type calculations, at a Measured Depth of 16305.88ft.,
The Bottom Hole Displacement is 13334.32ft., in the Direction of 161.287° (True).
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 2133' FNL, 1494' FEL and calculated along an Azimuth of 151.900° (True).
¡..----
H
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to AKB = 52' MSL. Northings and Eastings are relative to 2133' FNL, 1494' FEL.
Global Northin9s and EastinQS are relative to NAD27 Alaska State Planes, Zone 4.
Local Coordinates Global Coordinates
Northings Eastings Northings Easti,n
(ft) (ft) (ft)
11477.70 S 3663.06 E 5962675.65 N
11565.90 S 3710.16 E 59625ª§.66 N
11654.09 S 3757.25 E 5962497.67 N 375298.98 E
11742.29 S 3804..34 E 5962408.68 N 375344.56 E
11830.48 S 3851.44 E 5962319.69 N 375390.13 E
11918.68 S 3898.53 E 5962230.71 N 375435.71 E
12006.87 S 3945.62 E 5962141.72 N 375481.29 E
12095107 S E 5962052.73 N 375526.87 E
12183.26 S E 5961963.74 N 375572.44 E
12271.46 S 4086.90 E 5961874.75 N 375618.02 E
12359.65 S 4133.99 E 5961785.77 N 375663.60 E
12447.85 S 4181.09 E 5961696.78 N 375709.18 E
12536.04 S 4228.18 E 5961607.79 N 375754.75 E
12624.24 S 4275.27 E 5961518.80 N 375800.33 E
12629.43 S 4278.04 E 5961513.57 N 375803.01 E
Sperry-Sun Drilling Services
Proposal Report for Plan: C02-58 - C02-58 (wp06)
Your Ref: Generated in Planning Session (4-3-03)
Revised: 6 May, 2003
'7269t82
7271mZ8
7271.90
7260.02
7261.98
7263.94
7265.90
7267.86
7250.21
7252.17
7254.13
7256.09
7258.05
7246.28
7248.25
Vertical
Depth
(ft)
7217.82
7219.78
9.90
7208.02
7209.98
7211.94
7213.90
7215.86
7198.21
7200.17
7202.13
7204.09
7206.05
7194.28
7196.25
Sub-Sea
Depth
(ft)
151.900
151.900
151.900
151.900
151.900
151.900
151.900
151.900
151.900
151.900
151.900
151.900
151.900
151.900
151.900
Azim.
88.876
88.876
88.876
88.876
88.876
88.876
88.876
88.876
88.876
88.876
88.876
88.876
88.876
)
16200.00
16300.00
16305.88
=?:~~~J
~
";~J
15700.00
15800.00
15900.00
16000.00
16100.00
15200.00
15300.00
15400.00
15500.00
15600.00
15000.00 88.876
15100.00 88.876
Incl.
Measured
Depth
(ft)
Alaska North Slope
DrillQuest 3.03.02.002
Page 9 of 11
6 May, 2003 - 19:15
For mat Ion PI a n e Profile Penetration Poi n t
(Below Well Origin) Measured Vertical Sub-Sea
Sub-Sea Dip Up-Dip Depth Depth Depth Northings Eastings Formation Name
(ft) Angle Dirn. (ft) (ft) (ft) (ft) (ft) J
1500.00 0.000 359.020 1672.01 1552.00 1500.00 470.66 S 117.98 E Pennafrost (est)
2150.00 0.000 0.000 2762.14 2202.00 2150.00 1315.11 S 329.65 E C-40
2345.00 0.000 0.000 3116.63 2397.00 2345.00 1602.27 S 401 .63 E C-30
2721 .00 0.000 359.020 3800.16 2773.00 2721.00 2155.96 S 540.41 E C-20
3792.00 0.000 359.020 5747.13 3844.00 3792.00 3733.11 S 935.74 E K-3 Marker
Target (Mid-Pt) End Dir, Start Sail @ 88.88° : 14781.59ft MD, 7242.00ft TVD
Target (Toe) Total Depth: 16305.88ft MD, 7271.90ft TVD (1065' FSL, 2506' FEL, Sec. 13-T11 N-R4E)
t (HeelJEnd Dir, Start Sail @ 89.0° : 12305.57ft MD, 7227.00ft TVD
Pt... Begin 6-1/8" Hole: 12306.00ft MD, 7227.01ft TVD (685' FNL, 893' FWL, Sec. 13-T11 N-R4E)
Dir @ 3.00/100ft: 12335.57ft MD, 7227.52ft TVD
rid Dir, Start Sail @ 89.67° : 12357.84ft MD, 7227.78ft TVD
Begin Dir @ 3.00/100ft : 14755.19ft MO, 7241.66ft TVD
.~.
SHL (2143' FNL & 1493' ÆL, SEC 2 - T1'ïN - R4E)
Begin Dir @ 3.00í100ft (12-1/4" Hole) : 280.00ft MO, 280.00ft TVD
End Dir, Start San @ 56.63° : 2167.57ftMD,1874.94ftTVD
9-5/8" Casing Pt... Drill out8-1/2" Hole: 3103.90ft MO, 2390.00ft TVD
..~ gin Dir~r4.00/100ft: 11431.89ft MD, 6971.10ft TVD
0.00 E
0.00 E
208.92 E
399.04 E
2090.02 E
North Slope, Alaska
Comment
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-58 - CD2-58 (wp06)
Your Ref: Generated in Planning Session (4-3-03)
Revised: 6 May, 2003
0.00 0.00 N
280.00 0.00 N
1874.94 833.49 S
2390.00 1591.96 S
6971.10 8338.04 S
7227.00 9100.99 S
7227.01 9101 .37 S
7227.52 9127.45 S
7227.78 9147.10 S
7241 .66 11261.79 S
7242.00 11285.07 S
7271.90 12629.43 S
Formation Toos
·c_......
~
if'--
"
r=-;
14781.59
16305.88
.~
.J
12305.57
12306.00
12335.57
12357.84
14755.19
c)
0.00
280.00
2167.57
3103.90
11431.89
Measured
Depth
(ft)
Comments
Alaska North Slope
DrillQuest 3.03.02.002
Page 10 of 11
6 May, 2003 - 19:15
9 5/8in Casing
7in Casing
6.-118" Open Hole
2390.00
7227.01
<Run-TO>
3103.90
12306.00
<Run-TO>
<Surface>
<Surface>
7227.01
<Surface>
<Surface>
12306.00
Casing Detail
To
Measured Vertical
Depth Depth
(ft) (ft)
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
-
Casinadetails
Formati on Plane Profile Penetration Poi n t
(Below Well Origin) Measured Vertical Sub-Sea
Sub-Sea Dip Up-Dip Depth Depth Depth Northings
(ft) Angle Dirn. (ft) (ft) (ft) (ft)
3991.00 0.000 359.020 6108.90 4043.00 3991.00 .. Basal K~3 SS ~
4021.00 0.000 359.020 6163.43 4073.00 4021.00 K-2 Marker
4114.00 0.000 359.020 6332.50 4166.00 4114.00 Base K2 Sequence
5609.00 0.000 359.020 9050.26 5661.00 5609.0Q;{\ Albian-97
6133.00 0.000 359.020 10002.84 6185.00 6133.00 Albian-96
6737.00 0.000 359.020 11100.86 6789.00 6737.00 8069.89 S 2022.80 E Top H RZ
6866.00 0.000 359.020 11335.37 6918.00 6?96.OQ 8259.85 S 2070.42 E Base HRZ
6908.00 0.000 359.020 11411.72 6960.00 6908tOO 8321.70 S 2085.92 E K-1 Marker
C"J 6949.00 0.000 359.020 11487.77 700 1 .00 IiiNô949.00 8383.71 S 2101.94 E Kuparuk
6992.00 0.000 359.020 11574.40 7044.00 6992.00 8455.99 S 2122.67 E LCU
'711
.<r;;;::",." 1 7110.00 0.000 359.020 11883.51 7162.00 7110.00 8724.71 S 2217.74 E Miluveach A
r 7129.00 0.000 359.020 11954.93 7181.00 7129.00 8788.32 S 2244.07 E Alpine 0
7156.00 0.000 359.020 12089.31 7208.00 7156.00 8908.50 S 2297.67 E Alpine C
North Slope, Alaska
Formation Toos (Continued)
Alaska North Slope
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-58 - CD2-58 (wp06)
Your Ref: Generated in Planning Session (4-3-03)
Revised: 6 May, 2003
n.f~.--
'-~
--"-:",~
~-:4..-",", ~
-.~~.
-~
~~~
Alaska North Slope
Sperry-Sun Drilling Services
Proposal Report for Plan: C02-58 - C02-58 (wp06)
Your Ref: Generated in Planning Session (4-3-03)
Revised: 6 May, 2003
Tarqets associated with this wel/øath
Target Name
C02-58 Toe T3
C02-58 (Mid-Pt) T2
C02-58 Heel T1
6 May, 2003 - 19:15
Mean Sea LeveVGlobal Coordinates:
Geographical Coordinates:
-..................................................... :-:..........................'.............
Mean Sea ÊeveVGlo8ãFtoordinates:
Geographical Coordinates:
eaTeveVGlobal Coordinates:
Geographical Coordinates:
Page 11 of 11
Target
T\lD
(ft)
7271 .90 12629.43 S 4278.04 E
7-219.90 5961-513.-57 N 375803.01 E
700 18' 11.7984" N 1510 00' 21 .7972" W
7242.00 11285.08 S 3560.21 E
7190.00 5962870.00 N 375108.28 E
700 18' 25.0248" N 151000' 42.7104" W
7227.00 9100.99 S 2393.92 E
7175.00 5965073.72 N 373979.52 E
70018' 46.5116" N 151001'16.7050" W
North Slope, Alaska
Target Target
Shape Type
Point Current Target
-
Point Current Target
Point Current Target
-
OrillQuest 3.03.02.002
DrillQuest
- 1 -
6 May, 2003 - 19:13
a
'~ I MD Delta Inclin. I Azimuth ¡ TVD Northings Eastings I Dogleg ¡ TooIface : VS (153<»
:J~~~J !
I (ft) MD (ft) (0) e>: (ft) (ft) (ft) ¡ (0/100ft) - (O) i (ft)
~ 0.0001
("-C 1 0.00 0.000 -52.00 5974214.32 N 371741.61 E 0.00
¡
2 280.00 280.00 0.000 O.OOO¡ 228.00 5974214.32 N 371741.61 E 0.000 0.000 0.00
3 2167.57 1887.57 56.627 166.908 1822.94 5973377.38 N 371936.25 E 3.000 166.908 833.65 '
4 11431.89 9264.31 56.627 166.908 6919.09 5965841.75 N 373688.70 E 0.000 0.000 8339.631
~ ~
~__ _"':~J 5 12305.57 873.68 89.000 152.880 7175.00 5965073.72 N 373979.52 E 4.000 334.969 9155.79
tr--"~~ I 6 I 12335.571 30.001 89.000! 152.88O 7175.521 5965047.02 N 373993.19 EI 0.0001 0.0001 9185.79
7 12357.84 22.27 89.668 152.878 7175.78 5965027.19 N 374003.34 E 3.000 359.825 9208.06 -~
8 14755.19 2397.34 89.668 152.878 7189.66 5962893.50 N 375096.24 E 0.000 0.000 11605.37
9T 14781.59 26.41 88.876 152.880 7190.00 5962870.00 N 375108.28 E 3.000 179.885 11631.77
10T ¡ 16305.88! 1524.29; 88.876] 152.880: 7219.901 5961513.57 NI 375803.01 E! 0.0001 0.0001 13155.76
MD Delta ¡ Inclin. Azimuth TVD I Northings Eastings Dogleg TooIface VS (152°) ,
(ft) MD (ft) ¡ (0) (0) (ft) ¡ (ft) (ft) (°/1000) (0) (ft) :
1 0.00 0.000 0.000 0.00 0.00 0.00 0.00
2 280.00 280.00 0.000 0.000 280.00 0.00 0.00 0.000 0.000 0.00,
3 2167.57 1887.57 56.627 165.928 1874.94 833.49 S 208.92 E 3.000 165.928 833.65,
4 11431.89 9264.31 56.627 165.928 6971.09 8338.04 S 2090.01 E 0.000 0.000 8339.63 :
5 12305.57 873.68 89.000 151.900 7227.00 9100.99 S 2393.92 E 4.000 334.969 9155.79:
I 12335.57,' 30.001 89.0001 151.9001 7227.521 9127.45 S 2408.05 EI 0.0001 0.0001 -
6 9185.79,
7 12357.84 22.27 89.668 151.898 7227.78 9147.10 S 2418.54 E 3.000 359.825 9208.06 :
8 14755.19 2397.34 89.668 151.898 7241.66 11261.79 S 3547.77 E 0.000 0.000 11605.37:
9T 14781.59 26.41 88.876 151.900 7242.00 11285.08 S 3560.21 E 3.000 179.885 11631.77i
L 10T 116305.8811524.29188.8761 151.900 7271.901 12629.43S! 4278.04Ei O.oooj 0.0001 13155.76
Sperry-Sun Drilling Services
Proposal Data - Plan: C02-58 - C02-58 (wp06)
) SPERRY_SUN HES )
Anticollision Report
Company: Phillips Alaska Inc.
Field: Colville River Unit
Reference Site: Alpine C02
Reference Well: Plan: C02-58
Reference Wellpath: C02-58
NO GLOBAL SCAN: Using user defined selection & scan criteria
Interpolation Method: MO Interval: 25.00 ft
Depth Range: 36.10 to 16306.84 ft
Maximum Radius: 1827.07 ft
Date: 11/4/2003
Time: 19:32:17
Page:
Co-ordinate(NE) Reference:
Vertical (TVD) Reference:
Well: Plan: C02-58, True North
52' MSL 52.0
Reference:
Error Model:
Scan Method:
Error Surface:
Db: Oracle
Principal Plan & PLANNEO PROGRAM
ISCW SA Ellipse
Trav Cylinder North
Ellipse + Casing
Survey Program for Definitive Wellpath
Date: 8/28/2002 Validated: No
Planned From To Survey
ft ft
36.10 500.00
500.00 16306.84
Version: 7
Toolcode
Tool Name
Planned: C02-58 (wp06) V25
Planned: C02-58 (wp06) V25
CB-GYRO-SS Camera based gyro single shot
MWO+IFR-AK-CAZ-SC MWO+IFR AK CAZ SCC
Casing Points
MD TVD Diameter Hole Size Name
1t ft in in
3103.97 2390.00 9.625 12.250· 95/8"
12306.00 7227.00 7.000 8.500 7"
16306.84 7271.90 6.125 6.125 6-1/8" Open Hole
Summary
<---------------------- Offset Wellpath ----------------------> Reference Offset Ctr~Ctr No-Go Allowable
Site Well Wellpath MD MD Distance. Area . Deviation Warning
ft ft ft ft ft
Alpine CO2 C02-35 C02-35 V1 309.77 300.00 229.04 5.29 223.75 Pass: Major Risk
Alpine CO2 CD2-35 C02-35A V1 297.24 300.00 228.96 5.10 223.85 Pass: Major Risk
Alpine CO2 C02-36 C02-36 PB1 V5 387.42 400.00 219.52 5.98 213.54 Pass: Major Risk
Alpine CO2 C02-36 C02-36 V5 387.42 400.00 219.52 5.98 213.54 Pass: Major Risk
Alpine CO2 C02-37 C02-37 V16 297.51 300.00 209.50 5.68 203.82 Pass: Major Risk
Alpine CO2 C02-38 C02-38 V5 320.32 325.00 199.69 5.39 194.30 Pass: Major Risk
Alpine CO2 C02-39 C02-39 V1 411 .91 425.00 187.46 5.98 181.55 Pass: Major Risk
Alpine CO2 C02-39 C02-39PB1 VO 411 .09 425.00 187.45 5.97 181.55 Pass: Major Risk
Alpine CO2 C02-41 C02-41 V9 11615.56 13024.00 189.37 284.29 15.37 Pass: Major Risk
Alpine CO2 C02-42 C02-42 VO 298.42 300.00 159.90 4.89 155.00 Pass: Major Risk
Alpine CO2 C02-42 C02-42PB1 VO 298.42 300.00 159.90 4.89 155.00 Pass: Major Risk
Alpine CO2 C02-44 C02-44 V15 298.18 300.00 140.09 5.48 134.61 Pass: Major Risk
Alpine CO2 C02-45 C02-45 V5 298.06 300.00 131.19 5.24 125.95 Pass: Major Risk
Alpine CO2 C02-46 C02-46 V2 298.25 300.00 119.62 4.98 114.65 Pass: Major Risk
Alpine CO2 C02-47 C02-47 V2 321.98 325.00 109.84 5.28 104.57 Pass: Major Risk
Alpine CO2 C02-48 C02-48 V1 298.77 300.00 100.12 5.61 94.51 Pass: Major Risk
Alpine CO2 C02-49 C02-49 V1 346.20 350.00 88.18 5.36 82.85 Pass: Major Risk
Alpine CO2 CO2-50 C02~50 V2 298.78 300.00 80.78 5.82 74.95 Pass: Major Risk
Alpine CO2 CO2-50 C02-50PB1 V2 298.78 300.00 80.78 5.82 74.95 Pass: Major Risk
Alpine CO2 Plan: C02-43 C02-43 (GR Core Pilot) 298.53 300.00 149.94 5.92 144.02 Pass: Major Risk
Alpine CO2 Plan: C02-43 C02-43 (ST Core) V7 PI 298.55 300.00 150.11 5.96 144.15 Pass: Major Risk
Alpine CO2 Plan: CD2-43 Plan: C02-43 (GR Horz) 298.55 300.00 150.11 5.96 144.15 Pass: Major Risk
Alpine CO2 Plan: C02-43 Plan: C02-43 (ST Horz) 298.53 300.00 149.94 5.92 144.02 Pass: Major Risk
Alpine CO2 Plan: CO2-51 C02-51 (Rig Surveys) V 274.97 275.00 71 .41 5.10 66.31 Pass: Major Risk
Alpine CO2 Plan: CO2-51 C02-51 (WP05) VO Plan: 274.97 275.00 71.41 5.10 66.31 Pass: Major Risk
Alpine CO2 Plan: CO2-51 C02-51 V4 Plan: CO2-51 299.30 300.00 70.05 6.25 63.80 Pass: Major Risk
Alpine CO2 Plan: CO2-52 C02-52 V3 Plan: CO2-52 347.88 350.00 59.70 6.16 53.54 Pass: Major Risk
Alpine CO2 Plan: CO2-54 C02-54 VO Plan: A 15 (p 299.59 300.00 40.27 6.14 34.13 Pass: Major Risk
Alpine CO2 Prelim: C02-40 C02-40 VO Plan: C02-40 298.29 300.00 180.09 6.24 173.85 Pass: Major Risk
Alpine CO2 Prelim: CO2-53 C02-53 VO Plan: CO2-53 299.49 300.00 50.11 6.26 43.85 Pass: Major Risk
Alpine CO2 Prelim: CO2-55 C02-55 PB1 V1 Plan: CO 299.69 300.00 30.10 6.15 23.96 Pass: Major Risk
Alpine CO2 Prelim: CO2-55 C02-55 VO Plan: CO2-55 299.69 300.00 30.10 6.26 23.85 Pass: Major Risk
Alpine CO2 Prelim: CO2-56 C02-56 V1 Plan: CO2-56 299.79 300.00 20.11 6.26 13.85 Pass: Major Risk
Alpine CO2 Prelim: CO2-57 C02-57 VO Plan: CO2-57 299.90 300.00 10.10 6.26 3.84 Pass: Major Risk
Alpine Satellites Nanuq 3 K-33 VO Plan: K-33 V1 Out of range
Alpine Satellites Nanuq 3 NQ-16 VO Plan: NQ-16 V Out of range
OR:
\~¡~~'i
q :', I
" ~
,
',,';.It.'::)
WELLPATHDEf AllS
Cm-58
Rig: Do)'on 19
Ref. DaIUm: 52' MSL 52.00fi
V.Seemn Origin Origin SIaIÛn¡!
Angle +NI-S +EI-W From TVD
161.29' 0.00 0.00 0.00
COMPANY DEfAllS
P~s M<ska Inc.
Engineering
KnparuI:
CaktWoon MeIhod: MinimD:n Cmva_
Error Sysœm: ISCWSA
Scan MeIhod: Tea\' C¡iOOeT North
Error Surn,,:e; EIipIical + Casing
Warning Method: Roh Based
ANTI-COLLISION SETTINGS
25.00
16306.84
Plan: CO2-58
In1erval:
To:
Reference:
Interpolation Method:MD
Depth Range From: 36.10
MaximJrn Range: 1827.07
WElL DEf AILS
Nunc: +NJ.S +EI-W Nönhing EaslÍ1g Latirudc IAngitOOe Sbl
-m.lj:!, -426. 5 5974214. 371741 7lf2O'16.oJON 151'02·26.mW NlA
ToMD
250
500
750
1000
1250
1500
2000
2500
3500
4500
5500
6500
7500
9500
11500
13500
15500
17500
From
o
250
500
750
1000
1250
1500
7000
2500
3500
4500
I'm; CO2-57 (CO~m
Pr~~1 ~;gg
11500
13500
N'" '. '" ", " ., ,"', ", " '. .c). ". "., _., ~ 15" " ."" ' I' 5' 500
;-, '\~/À
~...,----_. '" YX//-"60, " ,
"'.//&~Â.
../ //.....--~
#' ~ ~.iÏIJ!".I- ~---'1
....::=~:=:---\'
\
Colour
(wp06)
~.o-
------- - 50
2/1.11
18lr- I
CD2-58 (wp06)
APPROVED Plan --
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation flOfUin]
-,'
~'
-
90
)
/
Prelim: C02-56 (C02-56)
)
~/
--mo--'
-~.TI
,/
(
,
\
\
27~
-22.
-20.0
-0
-S.O
-15.0
-10.0
-10.0
-15.0
-S.O
ToMD
250
500
750
1000
1250
1500
2000
2500
3500
4500
5500
6500
7500
9500
11500
13500
15500
17500
SURVEY PROGRAM
Depth Fm Depth To SurveyIPlan Tool
36.10 500.00 Planned: C02-58 (wp06) V25 CB-GYRO-SS
500.00 16306.84 Planned: C02-58 (wp06) V25 MWD+IFR-AK-CAZ-SC
0
21
-100 100
-105 lRJ05
SECfION DETAILS
See MD c Azi TVD +N/-S +EJ-W DLeg TFace VSee Target
1 3610 0.00 0.00 36.10 0.00 0.00 0.00 0.00 0.00
2 280.00 0.00 0.00 280.00 0.00 0.00 0.00 0.00 0.00
3 2167.66 56.63 165.93 1874.99 -833.56 208.95 3.00 0.00 856.53
4 11432.59 56.63 165.93 6971.13 -8338.81 2090.30 0.00 0.00 8568.62
5 1230621 89.00 151.90 1227.00 -9101.71 2394.19 4.00 -25.03 9388.69 CD2-58 (Heel New)
6 12336.21 89.00 151.90 1227.52 -9128.17 2408.31 0.00 0.00 9418.28
7 12358.48 89.67 151.90 1227.78 -9147.82 2418.80 3.00 -0.20 9440.26
8 14756.03 89.67 151.90 1241.66 -11262.68 3548.14 0.00 0.00 11805.65
9 14782.44 88.88 151.90 1242.00 -11285.97 3560.58 3.00 179.91 11831.70 CO2-58 (Mid-PI)
10 1630684 88.88 151.90 1271.90 -12630.42 4278.48 0.00 0.00 13335.40 CD2-58 (Toe New)
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [SOfUin]
90
)/
/~
¿J
)
/
-105
-100
-50
~I
~ .
! f':"
-25l r!
~ /-
Q
. 270
:::-! ¡1
~ -4;"
~.- -;,
-75
···-1
.~ -=20
:1----
-75
-20.0
-22.
-I
80.0-=-1
=1
75.0-=- :
-
-
-
^ -
.V _
-
-
.0-=-
-
-
-
^ -
........., -
-
4:: -
L.-..I ^ -
ç:: -
0 -
.- -
....
ro
~ -
p.. -
~
CI') -
Q) -
~
....
s:::: -
Q) -
U 35.0---=:
0 -
.... -
~ 30.0---=: ¡..
Q -
::t~ -
-
-
~."
-
-
f:;---:"'--~""~
j
'.0-
; .0---=-
0.0
Plan: CD2-58/CD2-58
·
:
·
·
,
· ·
·
:
,
·
....... ' : , : . .
.... m ......... ".. ' ,
. .. ..... .... '-"
.....,. .. .
'. .
.' .
. ············.......m
...... ....,.
..
..... . ...
."
. . :
. : :
..... .:.. :...' .
,
.
.
.'
·
· ',' ... ........
. mm ,
· ':'
> .. ...
,
·
· ...
.
" "',' .........
:..
.
.
, :
.'.
..... ..."',...:.... :
·
·
·
·
.
: ·
·
. : '.
:
· ,
:
-
·
--
·
·
.'
........... ..... ...
,
.
, ". .. ,
:
-
-
-
-.,-
-
-
-
II I I II II
I I I I
II II II I I I I I I I
-200
..
I I II II I I
II II
CD2-35 (CD2-35)
CD2-37 (CD2-37)
CD2-41 (CD2-41)
CD2-45 (CD2-45)
CD2-49 (CD2-49)
Plan: CD2-43 (CD2-43 (ST Core)}---
Plan: CD2-51 (CD2-51 (WP05))
Nanuq 3 (K-33)
_____ ___ __"_____ _no. _._
.."
,
. :
,
.: ...... .
, : " :
. .... . ......... .....]m], ......
,
· ........
:: ':
· :
,
· ".
...
.'
.:
:
.
. :
:.'
.-
: '
.
Eff
:
,
.
.
.
. . : :
.
·....r
, ,
: .
:. ...... ·········H ,....
. . . . T
, .
. ..' .... ..........".....:... ........ :.,,'
I i I I i I I i II I II I
.
. .
://
..... ¡. ....... .
........... ¡"T! ....
iT : .....
.. .
. ", '..
,
:
...... . ....:, .:.... "
tBliÞ¡mrP;t~ ,.. ........
:. :.: . .:. :
, .....
: :: ;¡ . ..... : ......, . " '. ..: ....
·[Itlff:'" 'm", .' : ' . . :
....:..,. "m, ....... ... ... :. ." ..........
: .'. .: .:: : .
. . .
L ... :r ...,.. .......... ......... ......} :... .·.·.·.··mT
¡ I i Iii ¡¡I ¡ i II I I I II I i I II II I II
.>',m.. ..'.. ....
,
'..
.
..... .........
. .
·
:
·
.' ...:
: :.:,:'
:",H,m .
: .:
,
..........
:
, '
:
. :
: :
:
:
:
...... . ..... : .'
, :
, :
:....
I
....... .':-:...
, :
:
.:
. ..
, ,
.. ...:..
I I II i
,
·
:I.ªH:IIii . . .
. . . . ::'.
" , ,
;: > ,
, ',:: ,',
: . ' :
.. ,,' ...... . ....,.. .
...... .....L., iT
,. :. - : .
. ," '.' ""::.:. .
...... -. .:.. . :
:: :,: . ,/'
i,m, ", · ..... v..:L
/"'""--;
,. '
:
,
:.... .
.:............
,
.
.
.. .
,
.
/
,
:./
.' /'.
,
V. .:......
:
'] .
: :.::
. :.....,. ,... .... ......
: ' ,..
. . '
""TT' :....:... ¡...,.. V
--
- .
. --l- --- .:... :
. : ,.. .. ....... '..m
,
m . ..'. I: .."...... : :
, .
.
. ' : .
...
.
:..
.
:
,
, :
" . '
,
,
:: :
,
: .
.... . ...:
: ': .
.
--H-:--'--
:
,
,
....... .,,'.. : ......:.
..... .
:: :
, .:,
:"', ....". ...'........
.\j: .: . ..:..
I I I I I" II I I I i I I
, .
.
.m
450
Measured Depth [ft]
CD2-35 (CD2-35A)
CD2-38 (CD2-38)
CD2-42 (CD2-42)
CD2-46 (CD2-46)
CD2-50 (CD2-50)
Plan: CD2-43 (plan: CD2-43 (GR Hðl"Z"})
Plan: CD2-51 (CD2-51)
Nanuq 3 (NQ-16)
.",1
./
. ,...... , "k/'mm
,
. I
, .
... ,
'f
/.
/'
...
,/
./
,
:'
:
:
.
:
...
: ,
: , .
,
, . "
.... . .... 'T
-
.. .
..:. . ....
..
.
......
:
.
; .
.
: ,.. .
,-
.
:
.
, '
,..
: .
r-
..
I ¡Ii
HOO
CD2-36 (CD2-36 PBI)
CD2-39 (CD2-39)
CD2-42 (CD2-42PBl)
CD2-47 (CD2-47)
CD2-50 (CD2-50PBl)
Plan: CD2-43 (plan: CD2-43 (ST HörzJ1
Plan: CD2-52 (CD2-52)
CD2-36 (CD2-36)
CD2-39 (CD2-39PBI)
CD2-44(CD2-44)
CD2-48 (CD2-48)
Plan: CD2-43 (CD2-43 (GR Core Pilot))
Plan: CD2-51 (CD2-51 (Rig Surveys))
Plan: CD2-54 (CD2-54)
GEOLOGIC SUMMARY:
Target 1 :
Formation
ALPINE C (HEEL)
ALPINE_C (MID PT)
ALPINE_C (TOE)
X
373,977
375,108
375,689
Target Shape:
Remarks:
Target 2 :
Formation
Target Shape:
Remarks:
Geological Prognosis:
Formation
C-40
C-30
C-20
K-3 MARKER
BASAL K-3 SS
K-2 MARKER
BASE K2 SEQUENCE
ALBIAN 97
ALBIAN 96
TOP HRZ
BASE HRZ
K-1 MARKER
TOP KUPARUK
LCU
MILUVEACH A
ALPINE 0
ALPINE C
ALPINE C ABOVE SHOE
BASE ALPINE BELOW SHOE
')
x
CD2-58
Resp: Steve Moothart 0 Incomplete
Preferred Tar.
y Z (TVD.SS) Porosity Perm Net Pay Angle
5,965,079 7,175' 0.19 4 46
5,962,870 7,190'
5,961,736 7,215' 3 22
Approx
Stepout:
D Not Applicable
Preferred Tar.
y Z (TVD.SS) Porosity Perm Net Pay Angle
Approx
Stepout:
Responsible: Steve Moothart 0 Incomplete
y Z (TVD.SS) MD Gross Net Pay Net to Gross
Thickness
x
2,150'
2,345'
2,721'
3,792'
3,991'
4,021'
4,114'
5,609'
6,133'
6,737'
6,866'
6,908'
6,949'
6,992'
7,110'
7,129'
7,156'
7,1E8
60'
7,215'
Remarks:
Geological Discussion: Responsible: 0 n Incomplete
C02-58 is the next producer being drilled in the southern row of C02, 1500' east of injector CD2-36. Depositionaly, wells along the
southern row of C02 are targeting the distal margin of the shoreface deposits developed in the core of C02. Intermediate shale beds
develop in the sands to the south and net/gross ratios begin to drop. C02-58 is planned to land in the upper part of the Alpine C to
capture the good quality sand that was seen in the heel portion of CD2-36. We'll attempt to stay in this as long as we can then begin to
drop as the upper sands begin to shale out. A mid-point target is given in addition to the heel and toe targets. Further adjustment may
be made to the targets depending on where the top Alpine C comes in prior to landing or based upon sand quality. No faults have been
mapped along the wellbore, but three areas have been identified as possible small faults at or near our seismic resolution. These are -
13,800' md possible small down to north fault (-10ft), -14,300' md possible small down to north fault (-10ft), and -15,200' md possible
small down to the north south fault (-10ft). These areas should be noted as possible areas of lost circulation while drilling.
t~¡..
~r ~1
,i '
"';\'.'/'
, I)J A L
::,"""1'>0, ,
ConocoPhillips Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
)
)
Conoc6Phillips
May 6, 2003
Alaska Oil and Gas Conservation Commission
333 West ¡th Avenue, Suite 100
Anchorage, Alaska 99501
RECEIVED
Re: Application for Permit to Drill
CD2-58
MAY OB 2003
Alasita ŒI & Gas Coos. CcmmiMn
Anchorage',
Dear Sir or Madam:
ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production
well from the Alpine CD2 drilling pad. The intended spud date for this well is May 21,
2003. It is intended that Doyon Rig 19 drill the well.
The well CD2-58 will be drilled to penetrate the Alpine sand horizontally. 7" casing will
then be run and cemented in place. The 6-1/8" horizontal section will be drilled with oil
based mud using mineral oil as the base fluid. CD2-58 will be completed as an open
hole producer. At the end of the work program the well will be shut in awaiting surface
connection.
Note that it is planned to drill the surface hole without a diverter. There have been 38
wells drilled on CD1 pad and 32 wells drilled on CD2 pad with no significant indication of
gas or shallow gas hydrates.
It is also requested that the packer placement requirement be relaxed to place the
completion packer 200 ft TVD above the Alpine formation. This will place the
completion at maximum inclination of less than 65 degrees and allow access to the
completion with standard wireline tools for future intervention.
Please find attached the information required by 20 ACC 25.005 (a) and (c) for your
review. Pertinent information attached to this application includes the following:
1. Form 1 0-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a).
2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1).
3. A proposed drilling program, including a request for approval of annular pumping
operations.
4. A drilling fluids program summary.
5. Proposed completion diagram.
6. Proposed completion diagram with open hole isolation options.
7. Pressure information as required by 20 ACC 25.035 (d)(2).
8. Directional drilling / collision avoidance information as required by 20 ACC 25.050
(b).
Information pertinent to this application that is presently on file at the AOGCC is:
1. Diagrams of the BOP equipment, diverter equipment and choke manifold layout as
required by 20 ACC 25.035 (a) and (b).
2. A description of the drilling fluids handling system.
3. Diagram of riser setup which replaces diverter.
OR:G~NAl
)
)
If you have any questions or require further information, please contact Zane Kuenzler
at 265-1308 or Chip Alvord at 265-6120.
Sincerely,
- ~lW~ ~
Zane Kuenzler E/;tI~
Drilling Engineer
Attachments
cc:
C02-58 Well File / Sharon Allsup Drake
Chip Alvord
Vern Johnson
Cliff Crabtree
Steve Moothart
Nancy Lambert
Lanston Chin
ATO 1530
A TO 868
ATO 802
ATO 848
ATO 844
Anadarko - Houston
Kuukpik Corporation
e-mail:
Tommy_Thompson @ anadarko.com
O~ G-NA~
)
S. K. ALLSUP-DRAKE
PHILLIPS PETROLEUM COMPANY
700 G ST. ATO 1530
ANCHORAGE AK 99501
1040
DATE Hi 8/2JXJ3 62-14/311
~1~~~~E 971f TG ()r: A LAst ß ! /t·o0cc I $ (ro.oo
......-- 1'), fi I r r I ~ () /<-0 l"", ---= A =~_
(/~__ ~ckv-e-d d-ð ~ /1' DOLLARS I.!J O"o",,'"ook.
..... CHASE Chase Manhattan Bank USA, N.A. Valid Up To 5000 Dollars
'-, 200 Whlto Clay Contor Dr" Nowark. DE 19711
MEMo__~~~:ld_L
I : 0 ~ ¡. ¡. 0 0 ¡....... I: 2 ¡. 8 0 0 0 0... 2 7 2 5 7 II- ¡. 0 ... 0
~
~
~
~
~
#
~
<::)
)
. TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME cea.. {!¡)2~š:B
PTD# 203-ogs
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(H API number
last two (2) digits
are between 60-69)
PILOT
(PH)
"CLUE"
The permit is for a new wellbore segment of
existing well
Permit No, API No.
Production should continue to be reported as
a function' of the original API number. stated
above.
HOLE In accordance with 20 AAC 25.005(1), all
records, data and logs acquired for the pilot
hole must be clearly differentiated . in both
name (name on permit plus PH)
and API Dumber (SO
70/80) from records, data and logs acquired
for well (name on permit).
SPACING
EXCEPTION
DRY DITCH
SAMPLE
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
peñorate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing . exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
\'\G0-s,«: ~~, ~, ~
~. ð0 "c)'~R1:~<è'S.~cJ Q~?\CJ. '-.)Dc\ o~~t;,S'--~\CJ-'~~'S~~~~\ (\
6- \-'\,... \: '" ~Q:. \\. ~ ~'K_ ~ "~\'~'.) "-'-- \ ~()... ~ "",Cy\' \ CC c.. c:) ~<; '- 2J <t~
\..)~~ \ ~(L\"~~'~~ \Cèc:,~ì.~~ "-''i ð-Q.~l\Cd-S' j~)ìR)
~~ \ ~ ~ S-...) ~ ~" ~~ ö.. ~ «'0~\ ~.~ ~"e) ~
Rev: 07/10/02
C\jody\templates
WELL PERMIT CHECKLIST' Company .cç)Nº_~QPH1L"1IP~t~J,,hÂKAJ~..c
PTD#:2030850 Field & Pool 1;-º-I".Yll-_L".~Rt\L~B, ALPINE OIL -120100
Administration
Appr
)
Date
5/8/2003
Engineering
Appr Date
r ~~ J{9/2003
h- V ' rv ~
-- ----_.._--------
Geology
Appr
SFD
Date
5/8/2003
Geologic
Commissioner:
or>
Well Name: kQLYLL_L"J;-'~J.\LUNIT GJ12-58
Initial Class/Type DEV 11-01L GeoArea lt90
Program .DEV
Unit 50360
Well bore seg D
Annular Disposal ~
On/Off Shore .on
1 P~rmit.fee attaçhe'p_ . _ _ . _ . . .. , . . .. .. . .. .. . . . _ . _ _ _ _ _ _ _ _ _ _. _ _ _ _ , .. _ . _ _ _ . Y~s _ . .. _ _ _ _ .. _ , _ ' . _ . _ _ _ _ _ . _ _ . _ . . . _ . _ _ _ _ _ . . _ _ _ _ .. _ _ _ .. - . . - -. - - - - - - . . - -. - ..
2 .L~as~.m.HJ1ber _appropri!3t~_ _ _ . . .. . . . . . _ . . . . . . . . . .. . . . . . . . . . . . . . . . .. _ Y~s . . . . . . . . . .. . . _ . . . . _ . . . . . . . . , . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . - . . . . .. - - .. . - , .. . . - .
3 _U_nlque. well_ n_am~ .aoQ oumb_er . . . . . . . _ .. , _ _ .. . _ _ . _ _ _ . . _ _ . . . . . . . . .. _ _ _ . Y ~s . _ _ . _ _ _ _ _ . _ . . . _ _ . _. _. _ _ _ _ _ _ _ _ . _ . _ _ _ _ - - - . . - . - - - - - . - . . .. . - - - - . - . . . . . . . - . - . - - -
4 .W~IIJQcat~d In.a_d_efine'p,pool_ _ . _ _ _ . _ . . _ _ .. . . . . _ _ . _ . _ . _ . . . _ _ _ _ _ . _ . _ . . Y~s . _ . . . . _ . _ . . _ _ _ _ .. _ _ _ _ . . . _ _ _ .. _ _ _ _ . . _ . . - - - . . - - . - - . - - - - .. . - . . .. - - - . . . - - - . - . - . .
5 _W~II JQC!3t~d. pr_oper .dlstançe_ from qriJling I,Jnit. b.ol,Jndary. _ . . _ . _. _ _ _ _ _ _ _ _ _ . . . _ . _ . Y ~s _ _ _ . . _ . . _ _ _ _ _ . _ .. . . . . _ _ . _ _ _ . _ _ _ _ . _ _ _ _ _ .. _ . . . - - - - - - . . . . - - - - .. - . . . ' . - - - - - - - - - - . -
6 _W~II JQcat~d. pr.oper _dlsta!1c:e..frO.m. QtbeJ w~lIs_ . _ . _ . _ _ . _ . . . _ _ _ .. . . _ _ _ .. . . . . _ _ Y ~$ _ _ _ . . _ . _ . _ _ . _ . . . . . _ _ _ _ _ _ _ . _ _ _ . - - - _ - . . - . - - - . . . . . - - - - - - - - . . . - - - - - . . . - . . . . . . - .
7 .S.ufficient açr~ag(3 _ayailable in_ drilJirm unH _ _ _ , _ . . _ _ . . . . . _ _ . . . . . _ _ _ _ _ _ _ . . . . Y ~s _ _ . _ .. _ _ . . . . . _ _ _ _ _ _ . _ . . . . _ . _ _ _ . . _ _ . . - . . - - - . . - - . . . - - - - . - - . - . - - - . .. . - . . . . - - -
8 Jf..d~viat~q, js. weJI bQre plaUncJu.peq _ .. _ _ . _ .. . _ _ _ _ _ _ _ . . _ _ . . . . _ _ _ _ _ _ . _ _ . . . Y~s . _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ . _ .. . _ _ _ . . . _ _ _ _ _ _ . . . . - . . - -. . . .. . . . . . - - - - - - . - . . . . . . . - .
9 .Qp~r:.ator only- aff.ect~Q party _ _ _ _ . .. _ . _ . _ _ _ _ .. _ _ . . . . . . . _ _ _ . _ _ _ _ . _ _ . _ . . _ Y ~s _ _ _ _ . . . . _ _ _ _ _ . _ _ _ . . _ _ _ _ . _ _ . . . _ _ . . - - . - . . - - . . - - - . . . . . . . - - - - - - .. . - .. .. - - . - . - . - . - .
1 0 _Qp~r:.ator bC!s_approprlate_ QonQ In Jorçe. . _ .. .. .. _ _ . _ _ . .. . . . . . . _ . . _ . _ . . _ . _ _ . _ . ..Y.~s . _ _ _ . . . . . . .. _ _ _ . . . _ . . . _ . . . _ _ . _ _ . _ _ . . . _ _ _ _ _ . . . - - - - . - - . ' . . - - - - - - . . . . - . . - - . . - .. .
11 P~rmit.. c.ao Þe i..ssuep wHbQut ço_nserva_tion order _ . . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . . _ _ _ _ Y~s _ _ . _ . . . _ _ _ _ _ _ . _ _ . _ . _ _ _ _ _ _ _ . _ . . - _ _ - . - - . . . - . .. - - - - - - . - . - . - - - . - . . - - - - - - - - - - - - - -
12 P~rmit.. c_ao Þe. lssuep wjtbQut administrati\le_appr.ovaJ _ _ _ _ _ _ _ . . . . . _ . _ . _ _ _ _ _ _ _ _ _ Y~s . _ _ _ . . . _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ . _ . _ _ _ _ _ _ _ .. .. .. . . . - - - - . - . . . - - - - - - - - . . . . - - . - - . - - -
13 _C_ao permjt Þe apPJQv~d before .15-pay. wait. _ . . . _ . . . . _ . _ _ _ _ _ _ _ _ _ . _ _ . . . _ _ _ _ Y ~$ . _ _ . . . _ . _ _ _ _ .. _ . _ _ . . _ . _ _ _ _ . _ .. _ . - - - - - - - .. .. . - . - . - - - - . . - - - - - - - . - - . . - . - - - - - - - - - - -
14 _W~II JQcat~d wiJhirl areC! an.d.strÇ1ta authori..zeq by_lojeGti.oo Ord~( # (Put..lO# ¡.n.c.olJll.ll~otsUFor_ NA . . . .. _ _ _ _ _ .. _ . _ _ .. . . . _ . _ _ _ _ _ . . _ .. - - - - .. .. - - . . . . - . - - - . . . . - - - - - . - - . . .. - - - - - - - - - - - - - -
15 _AJI wel!s_within_1l4_IlJil..e_are_a_ofreyi~w id~otifieQ (F.or&ervjc~.w.etlor!ly-).. _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ . . _ _ _ . _ _ _ _ _ . . . . _ _ _ . _ _ _ _ _ _ . . _ . _ _ _ _ _ _ _ .. . _ - . _ - - - - - .. - . - - - - - - - . - . . - - - - - - - - - - - - -
16 Pre.-proQu.ced injector; 'puratio.n_of pr~-:pro.PUGtionl~$s_ than_ 3 mon.ths. (For_s~r:.vlce well on.ly). _ NA . . _ _ . . _ _ _ _ . . _ . _ . . . _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ . _ . . . . - . - - - - - . . . - . - - . . . - .. - - - - - - - - - - - - .. - - -
17 _A.cMP..F::in.ding _of Con.si.steOGy.has been J&sued..for..tbi$ pr.oieçt.. _ _ .. _ _ _ _. . _ . . _ _ _ _ _ _ NA . . . . . . . _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ _ . - - - - - - - - . . . . - . . - - - - - . - . . - - - . - - . . . - . - - - - - - . - - - - -
18 _C.oOQu_ctor strin.g_prQvi.d~Q . . . . . . _ . . . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ . _ . _ . . _ _ _ _ _ _ _ Y~s . .. . . _ _ _ _ _ _ _ . _ _ _ . . _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ . . - . . . - - . - - - - . - . . - - - - - . . . . . . . - - - - - - - - - - -
19 _S_urJac~_ca&in.g.PJotec.ts.all_known..USQWs _. _ _ _.. _ _ _ _ _ _ _ _ _.. _.. _. _.. _. _ _ _ _ _ .NA _. _ _. _ _NoUSOWspr_ese.nt,_conc!u.si.oo3AIQ18A_ _ _ _.... _ _ _. _ _ _ _... -. - - - -. -. -.. - - - - -. - - - --
20 .CMT.. v.ol.. ad~quate..to çirc.wlat.e_on _cond.wçtor. & SUJf..CSg _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ Y~s _ _ _ _ _ _ _ . _ . _ _ _ _ . _ _ _ _ . _ _ . _ . . _ _ _ _ _ .. _ _ . . . . _ . - - - - - - - . . . . - - - . . - . - . - . . - - - . - . . . - - - -
21 _CMT..v.ol..adeQu_ate..totie-i..nJQng.st.ri[1gt.o_s!.IIJC&g_ _ _. _ _ _ _ _.. _ _ _ _. _ _ _ _ _ _.. _ _.. _ _ _ No_ _ _ _ _ _ _ _Al1n_ul..arQisp.osall.ll.!3yÞer:.eQue_st.eçJ._ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _ _ _ _.. _ _ _ - _ - -"" -.. - - - - - - - - - - - --
22 _CMT..will coyer.all koo..w..n_pro_duGtiye bQri~on.s_ _ _. _ _ . _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ No. _ . . _ _ _ _ Op~n_h.oIj;!.completLo[1Pl..aone.p.. . _ _ _ _ _ _ _ _ .. _ . . . . . - . - - . - - . - - - - - . .. . . - - . . - . . - - - . - . - - .
23 _C_asiog d~si.90S ad_equa.te. f.or C,.T~ B _&_ permafr.ost. _ . . _ . . . _ _ _ . . _ . _ _ _ _ _ . _ _ .. _ Yj;!s . _ . _ _ _ _ . _ _ _ . _ . _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ , . . - . - - - - . - - - - - - ' . - - - - . . - - . - - - . - - . - . . , . . . - - .
24 AdequateJan.kage.oJ re_serye pit. _ . . _ . _ _ . _ _ _ _ _ . . . . . _. _ _ _ _ . . _ _ _ . . . _ . . . _ Y~s . _ _ _ _ _ _ 8.ig ha& &teeJ pit.s, N.o re.s~r:.ve pit plÇ1n.ned.. Orilllng waste to_appr.ove.d.anoulus.Qr Class IJ well.... . _ _ _ _ _ _ _ . . .
25 Jf..a.re-drill~ bas.a. 1..0:403 fOJ !3ba_ndon.ment. be~o apprQved . _ _ _ _ _ . . _ _ _ . _ . _ _ _ _ _ _ . _ NA _ _ . . _ . . . . _ _ _ _ . _ , . . . . _ . _ _ _ _ .. _ . . . - - - - - - - - - - - - . . , - .. - - - . - . . - - - . .. . . . - - , . . . . . - - . .
26 .Adequate..w:eUbor~ &eparatjon .proposep. _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . . "yj;!s . _ . _ _ _ _ Close.appr:.oaGh..id~ntified ..aoq magn_et.ic. eff.eçt$ çalçuJa.te.d, _ _ _ _ _ , _ . _ . _ _ . - . - _ . - . . - . . - - - . . . - - -
27 Jf.div~cte.r.req!Jire.d, dQes jtmeet.r~gula.tions_ .. . _ . . _ . _ _ .. . . _ _ _ _ . . _ _ _ _ . _ _ . _ . _ . NA . . . _ . _ . Diy~rt.erwaiveJ bas_b_een giv~n..for.Co.2.pad.. . _ _ _ . _ _ _ _ _ _ . _ . _ , . . .. . _ - - . . . - - . . .. . .. - . . - . - . -
28 DrilJiog flujd.program sGh~mati.c.&.e.q!JipJistapequat~. , . . . _ _ . _ _ _ _ _ _ . _ _ , . . . . .. _ _ ..Y~$. . . _ _ _ . Max.imum e)Çp~cted for:.mation. pre&suœ.8,7_EMW.. MW plann~d 9.:1 ppg.. . . . - - - . - .. .. -- . . . . .. . . , - - - . .
29 ..BOPEs,.d.oJhey meet.. reg uJ a.ti on _ .. . . . _ . . . . . . . . _ _ _ _ _ _ . _ _ . _ _ .. . .. .. . . . . . _ .. .y~s .. _ _ _ .. . _ _ . .. _ _ .. _ _ _ _ _ _ . _ _ _ . _ . _ _ , . _ . .. . . . . _ _ . . _ . . . . - - .. . . - . . . , . . . .
30 .BOPE.pre.ss ratiog appropriClte; .test t..o_(pu.t psig in .comments). _ . . . _ _ ' . . , , , . _ _ , _ _ .. 'yj;!s . . _ _ MAS!? çalculate.d_at 2563 psi., 35QO.psi..appr.opriate~ PPCQ us.ually.tes.te.sJo 50.00 psi.. . . , . . . . .
31 _C.hoke.llJC!njfold cQmpJies. wI API. RR-53 (May 84). . . . . _ . . ' _ _ _ . . ., ,.. _ . _ . . .. .. . .y ~s _ . . . . . , . . . . _ _ . . _ . _ _ _ _ _ ., . _ _ - . . , . - . . - - . - . . - . . , , . . . - - - . . . . . . . . . . - .
32 WQrk will occ.ur wit.hout..operation ..sbutdo.wn. _. . _ _ . _ . _ _ . _ . _ _ _ _ _ _ _ _ "yj;!S ,. . . _ _ . . _ _ _ _ _ . _ _ . . _ . . . _ . _ . .. . . . . . . . . . . _ . _ . . . - . - - - - . -
33 1& pres.el'1ce, Qf H2S gas. prob_abl~. . No. . _ _ . . . _ _ . . . _ .. _ . . . . . ..
34 Meçha.nical,cpod.iti..oo .of we.lls wtth,in AOR verified. (For.s.er:vice w~11 QnJy-). . . . . . . _ . . . _ . , NA . . . .. . . . . . . . . _ _ . . . . . . . _ _ . . . . . - - . . . . . . . . . . . .. . . . . . .
----
---------.--.-
35 P~(mit. G.80 Þe i.ssued wfo. h,ydr,ogen. s.ulfide measures. , . . . _ . , . . . .y ~s
36 D.ata.pr~s~rJteq on. potential pverpres.suœ .zones _ . _ .. _ . _ . _ _ _ _ . . . . , .. _ . . _ .. . _ _ . . 'yj;!$ .
37 .S~i.slJlic.analysjs_ Qf shallow gas_ZPrJe.s, . . . _ . . _ _ _ .. .. _ .. _ . . .. _ . _ _. ... NA .
38 .Seabed .conditipD survey (if off.-shPre) . NA.
39 . CQnta.ct. nam..elphone..for..w:e~kly progres.s.reports [exploratory _ooly). . . . .. . . . . . _ . . . . . . NA
- - ~ - . . .
. . . . . . OvefPressur~ not.e.xp~.cted.. _ . . _ , . _ .
- - - - - .
- - - - - - - - . - - - - - - - - - - - - - - - - -
- - - - - - - - - . . - - - - - .
- - - - - - - -
- - - - - - - - - . .
- - - - - - -
.' - - - - . - . - - - - . - - - - . -
- - - - - - -
. - - . - - -
Date:
Engineering
Commissioner:
M
J~~
Public
commiS~ ~~
Plan is to drill surface hole without a diverter. Operator requests that well be permitted for annular pumping of fluids. SFD
Date
or;I¡t(o!?
)
)
Well History File
APPENDIX
Information of detailed nature that is not
particularly gennane to the Well Pennitling Process
but is part of the history file.
To improve the readability of the Well History file and to
sim'plify fìnding information. infomlalion of this
nature is accumulated at the end of the file under APPEN,DIX.
No special effort has been made to chronologically
organize this category of infonnation.
Sperry-Sun Dl )ing Services
LIS Scan Utility
)
¿;}o3 -D'8S
I I -'ð ~3
$Revision: 3 $
LisLib $Revision: 4 $
Fri Jun 20 08:27:04 2003
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/06/20
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/06/20
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Colville River Unit (Alpine)
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
CD2-58
501032045700
ConocoPhillips Alaska, Inc.
Sperry-Sun Drilling Services
20-JUN-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 3
MW0002452746
M. HANIK
D. MICKEY
MWD RUN 4
MW0002452746
R. KRELL
D. MICKEY
MWD RUN 5
MW0002452746
R. KRELL
G. WHITLOCK
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
2
11N
4E
2143
1493
52.49
15.90
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
8.500 9.625 3055.0
6.125 7.000 12128.0
#
1.
) )
ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE ~OTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
REMARKS:
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUNS 1 & 2 WERE DIRECTIONAL ONLY AND ARE NOT
PRESENTED.
4. MWD RUNS 3 - 5 COMPRISED DIRECTIONAL WITH DUAL GAMMA
RAY (DGR)
UTILIZING GEIGER-MUELLER TUBE DETECTORS;
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4); AND PRESSURE WHILE
DRILLING (PWD).
5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
MEG KREMER (CPAI)
DISCUSSION OF REQUIREMENTS 9/26/01. MWD DATA ARE
CONSIDERED PDC.
6. MWD RUNS 1 - 5 REPRESENT WELL CD2-58 WITH API#:
50-103-20457-00.
THIS WELL REACHED A TOTAL DEPTH (TD) OF
16389'MD/7191'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/20
Maximum Physical Record. .65535
File Type....... . . . . . . . . .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
3031.5
3040.0
3040.0
3040.0
3040.0
3040.0
3065.5
STOP DEPTH
16327.0
16334.0
16334.0
16334.0
16334.0
16334.0
16389.0
#
BASELINE CURVE FOR SHIFTS: ) )
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
BIT RUN NO
3
4
5
MERGE TOP
3031.5
12147.0
14866.0
MERGE BASE
12147.0
14866.0
16389.0
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 3031.5 16389 9710.25 26716 3031.5 16389
ROP MWD FT/H 0.78 514.84 165.216 26648 3065.5 16389
GR MWD API 30.01 404.23 99.434 26592 3031.5 16327
RPX MWD OHMM 0.1 2000 7.74785 26589 3040 16334
RPS MWD OHMM 0.06 1923.79 7.65066 26589 3040 16334
RPM MWD OHMM 0.06 2000 11.0745 26589 3040 16334
RPD MWD OHMM 0.02 2000 12.9748 26589 3040 16334
FET MWD HOUR 0.15 123.05 1.25083 26589 3040 16334
First Reading For Entire File. ....... ..3031.5
Last Reading For Entire File.......... .16389
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/20
Maximum Physical Record. .65535
File Type... . . . . . . . . . . . . .LO
Next File Name.......... .STSLIB.002
Physical EOF
)
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/20
Maximum Physical Record. .65535
F i 1 e Type.... . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
2
)
header data for each bit run in separate files.
3
.5000
START DEPTH
3031.5
3040.0
3040.0
3040.0
3040.0
3040.0
3065.5
STOP DEPTH
12112.0
12104.5
12104.5
12104.5
12104.5
12104.5
12147.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
29-MAY-03
Insite
66.37
Memory
12147.0
3065.0
12147.0
53.9
84.3
TOOL NUMBER
155790
136749
8.500
3055.0
LSND
9.60
46.0
9.3
450
.0
1.500
.000
1.900
1.500
70.0
149.0
70.0
70.0
MATRIX DENS ITY : )
HOLE CORRECTION (IN):
)
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............ ..Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 3031.5 12147 7589.25 18232 3031.5 12147
ROP MWD030 FT/H 4.39 376.08 195.017 18164 3065.5 12147
GR MWD030 API 38.64 404.23 117.18 18162 3031.5 12112
RPX MWD030 OHMM 0.1 2000 5.71407 18130 3040 12104.5
RPS MWD030 OHMM 0.06 57.55 5.54908 18130 3040 12104.5
RPM MWD030 OHMM 0.06 2000 6.55107 18130 3040 12104.5
RPD MWD030 OHMM 0.02 2000 9.98574 18130 3040 12104.5
FET MWD030 HOUR 0.15 123.05 0.808666 18130 3040 12104.5
First Reading For Entire File......... .3031.5
Last Reading For Entire File.......... .12147
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/20
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .03/06/20
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . ., Þ
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPM
FET
RPD
RPS
RPX
GR
ROP
$
3
')
header data for each bit run in separate files.
4
.5000
START DEPTH
12094.5
12105.0
12105.0
12105.0
12105.0
12112.5
12147.5
STOP DEPTH
14811.0
14811.0
14811.0
14811.0
14811.0
14804.0
14866.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
03-JUN-03
Insite
66.37
Memory
14866.0
12147.0
14866.0
84.7
95.2
TOOL NUMBER
62456
73634
6.125
12128.0
MOBM
8.60
82.0
.0
35000
.8
.000
.000
.000
.000
.0
160.0
.0
.0
$
)
)
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............ ..Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 12094.5 14866 13480.3 5544 12094.5 14866
ROP MWD040 FT/H 0.78 514.84 102.164 5438 12147.5 14866
GR MWD040 API 30.01 102.33 60.8901 5384 12112.5 14804
RPX MWD040 OHMM 2.39 1594.87 12.9625 5413 12105 14811
RPS MWD040 OHMM 3.09 1923.79 13.1863 5413 12105 14811
RPM MWD040 OHMM 0.08 2000 31.7465 5434 12094.5 14811
RPD MWD040 OHMM 4.55 2000 24.3493 5413 12105 14811
FET MWD040 HOUR 0.47 88.91 2.3671 5413 12105 14811
First Reading For Entire File......... .12094.5
Last Reading For Entire File.......... .14866
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/20
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/20
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header d~ )for each bit run in separate )s.
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 14804.5 16327.0
RPD 14811.5 16334.0
RPM 14811.5 16334.0
RPS 14811.5 16334.0
RPX 14811.5 16334.0
FET 14811.5 16334.0
ROP 14866.5 16389.0
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB!G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
05-JUN-03
Insite
66.37
Memory
16389.0
14866.0
16389.0
87.7
97.3
TOOL NUMBER
62456
73634
6.125
12128.0
MOBM
8.60
93.0
.0
38000
2.6
.000
.000
.000
.000
.0
163.0
.0
.0
Data Reference Point.... )...... . Undefined
Frame spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
service Order
Units
FT
FT/H
API
OHMM
OHMM
OHMM
OHMM
HOUR
size
4
4
4
4
4
4
4
4
Nsam
1
1
1
1
1
1
1
1
Code
Offset
o
4
8
12
16
20
24
28
Channel
1
2
3
4
5
6
7
8
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
MWD050
MWD050
MWD050
MWD050
MWD050
MWD050
MWD050
Rep
68
68
68
68
68
68
68
68
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 14804.5 16389 15596.8 3170 14804.5 16389
ROP MWD050 FT/H 2.17 301.54 100.072 3046 14866.5 16389
GR MWD050 API 37.05 124.2 61.7519 3046 14804.5 16327
RPX MWD050 OHMM 3.82 20.82 10.5862 3046 14811.5 16334
RPS MWD050 OHMM 3.77 18.92 10.3222 3046 14811.5 16334
RPM MWD050 OHMM 3.83 17.19 10.2555 3046 14811.5 16334
RPD MWD050 OHMM 4.04 16.43 10.5522 3046 14811.5 16334
FET MWD050 HOUR 0.42 25.99 1.8989 3046 14811.5 16334
First Reading For Entire File......... .14804.5
Last Reading For Entire File.......... .16389
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/20
Maximum Physical Record. .65535
File Type....... . . . . . . . . . LO
Next File Name.......... .STSLIB.005
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 03/06/20
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name..... . . . . . . . .LISTPE
Date.....................03/06/20
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number.... ..01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
)
)
Physical EOF
End Of LIS File