HomeMy WebLinkAbout185-155STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
FMCEAV,03
)AN 3 0 200
1. Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑
Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑
Plug for Redrill El •erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: CO261 B Whipstock 1A
2. Operator
4. Well Class Before Work:
5. Permit to Drill Number:
Name: ConocoPhillips Alaska, Inc.
Development Q Exploratory ❑
Stratigraphic❑ Service ❑
185-155
3. Address: P. O. Box 100360, Anchorage,
6. API Number:
Alaska 99510
50-029-21390-00
7. Property Designation (Lease Number):
6. Well Name and Number: KRU 3C-0$
ADL 25629, ADL 25634
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pool(s):
N/A
Kuparuk River Field / Kuparuk River Oil Pool
11. Present Well Condition Summary:
Total Depth measured 10,234 feet Plugs measured None feet
true vertical 6839 feet Junk measured 10068, 10084 feet
Effective Depth measured 10,137 feet Packer measured 9652, 9830 feet
true vertical 6,775 feet true vertical 6459, 6575 feet
Casing Length Size MD TVD Burst Collapse
CONDUCTOR 80 feet 16 116' MD 116' TVD
SURFACE 5,171 feet 9 5/8 " 5,206' MD 3732' TVD
PRODUCTION 10,224 feet 7 10,258' MD 6692' TVD
Perforation depth: Measured depth: 9904-9921. 9938-9954. 9976-10004 feet
True Vertical depth: 6623-6634. 6645-6656.6670-6689 feet
Tubing (size, grade, measured and true vertical depth) 3.5 " L-80 9,962' MD 6,661' TVD
Packers and SSSV (type, measured and true vertical depth) PACKER - BAKER PREMIER 9,652' MD 6,459' TVD
PACKER -OWEN LINER TOP PACKER 9,830' MD 6,574' TVD
SSSV - NONE
12. Stimulation or cement squeeze summary:
Intervals treated (measured): N/A
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation: SHUT-IN - - - -
Subsequenttooperation: I SHUT-IN - - - -
14. Attachments (required per 20 AAc 25,070. 25,071, s 25.283)
15. Well Class after work:
Daily Report of Well Operations 121
Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑
GSTOR ❑ WINJ [I WAG ❑ GINJ ❑ SUSPE] SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
318-535
Contact Name: Keith Herring
Authorized Name: James Ohlinger
Contact Email: Keith. E. Herring@cop.com
Authorized Title: Staff CTD Engineer
Authorized Signature:Date: 30 Contact Phone: (907) 263-4321
Form 1V11044,vised 4/2dl'7 VT -Z- x/5/19
�t'�(�Loa t 0 83f"w13ea
Submit Original Only
DTTMST/JOBTYP
1/16/19 DRILLING
SUPPORT
- CAPITAL
1/17/19 DRILLING
SUPPORT
- CAPITAL
1/18/19 DRILLING
SUPPORT
- CAPITAL
3C -08A
Post Rig Report
SUMMARYOPS
MIT TBG TO 6150 PSI WITH DSL
(JOB COMPLETE)
PULLED 2.81" PXX PLUG @ 9681' RKB. DRIFTED 2.25" DMY
PTSA TO LINER TOP @ 9831' RKB. SET 2.716" X -SPAN LINER
TOP PACKER, 2.70" NOGO, 2.25' PTSA @ SAME. MITT TO
4000 (PASS). ATTEMPTED TO PULL R -LOCK ON
RETRIEVABLE SEAL GUIDE IN PTSA. IN PROGRESS.
PULLED RX PLUG IN PTSA @ 9831' RKB. JOB COMPLETE AND
READY FOR FRAC.
KUP PROD WELLNAME 3C•08 WELLBORE 3C.08
ConocoPhillips
Ali 4,
ants a:.ae9 aN
Last Tag
•re
MnoM peishpin ) EMDaM wellown Last Mord ar
Last Tag: RKB (Esc 4bf Fill) 10,000.0 I 121182019 3C -IIB zembae,
I
nalNGHANGERI ffie-
Last Rev Reason
annolalmI
End Daw welllwn
La.I Me4 ar
Rev Reason'. Installed post frac OLD
I 112312019 3C-08
jun,sp
Casing Strings
Lasing Demiaion Do(in) .lint Top Inns) seCOepm hKan satoapdr Ran)-. wNLen p_. Gude TOPThread
CONDUCTOR 16 150fi 360 116.0 1160 62.58 H-00 WELDED
caring Description Do (In) IO um Top(11K01 Set Depur RKEN set Oepm llvia",I.. u-1.1and Tap Tllrted
SURFACE 9518 892 Mb 5,205.8 3,732.1 36.00 J-55 BTC
I
caemg DescXption IM 01) IDlinl TOP ROLE, Rel.1. In., Bet OapM(No)... WIRen 11... GrWe TOP TIIreM
CONDUCTOR; apparent
] 6.28 333 10,258.0 26.00 J-55 BTC
Tubing Strings
GPS LIR:}pi21
40 E
TUWnp OescdpllOn Shing Ma..
TUBING 3112
D (In,
2.99
1'2
TOp (OKE,
29.6
Set DepN lO..
9,961.6
sN DOd's(NO, I...wurrat
6,660)
9.30
Gbde
L-80
TOp COnpartion
EUE Bed Mod
PRODUCTIOry
Completion Details
TOP(N01 Tone. NwnNul
Find K I Inns) f) Ile. xc CO. lours
9,652.1 6,4590 49]2 Packer Packer Baker, Premier 598-287. fUl to release Pan M H]84-63- 2.910
SpRFAe 'sp ira.as.8-
0069
9,680.6 6,4]].5 49.84 NIPPLE Nipple, Halliburton, 2.818' X profile, $X:3902635 2.813
LAS LIFT., 5,M3
9,915.3 6,630.2 4.08 WEDGE A$$Y Wedge Assembly, Northern Solutions 2.992
9,9299 6,8394 48.99 NIPPLE Nipple, Halliburton, 2813" X profile, 2813
9,948.1 8,850.5 8.88 WEOGEA SY Pup Joint, 3-112".93M, L430, EUE 80 Mod Box x Pin 2992
9,950.0 1 48.86 NIPPLE Pup Joint, 3-112", 93X, L-80, CUE Bid Mad Box x Pin 2813
GfS UFi: B,f®.x
(khat In Nole (YVireline retrievable plugs,
valves, pumps, fish, etc.)
Top hinim
Top loot
Tornads)
hka,
fl
Des
Lend
Run Delo
to (in)
9.830.0
6,574b
49.35
LINER TOP
Owen Liner Top Packer with Locator sub and Positive 111]12019
1.781
GAS UFT; 0.1]O$
PACKER
test seat assembly with 1784"R Nipple pmfle. Max OD
2.]16' OAL 14'
%MR
6,5]4.9
49.35
C OLiner or
liner: Erned up law .Liner Top 12/3121
2250
the Alsai
9830.6'. Has a 2.25" ID X IP SBR on top (See 3"M 8
GAS LIF! 9 fir]
Chromate for dei
9,9500
66530
48.86
281 X -lock
2.81"X-bok cal Flow Thm Sub -1277
/
-1 75c
8
10,0680
6.731.1
4841
FISH
11/2'GLV In Rebels 311411996
0000
10,084 0
6.741 ]
48.38
FISH
98" X 114' JDS Skin Lost in Hole 85111989
0.000
GAsuFT:9.e2.4Perforations
& Slots
Peds; B..I
Shot
D®ns
TOP MD)
sM jNO,
IsIwbIR
TOP I0d0ovs,
BOn9210ime)
1OK0)
ortion6,63
LlnktlZane
par198
)
COm
9.5040
9,921,0
6.622.8
6,634.0
AA,Ad,3C-08
82311985
4.0 IPERFdg.
RFTYP
phase, 4" artier
NIPPLE; 9.(ID.6
HJ 11
9,9380
99540
6645.1
6,6553
A-3, 3C-08
WM985
4.0 IPERF
90
car. phase; 4" Carrier
HJ II
9,9760
10004.0
6.6702
6,6883
A -2,3C-08
6123/1985
40 IPERF
deg.phase;4" artier
HJ II
Mandrel Inserts
at
an
LINER TOP PACKER: 8,90
on TOP(rvq valve Lath Fiat TRO Run
NECTO10"Ho moo Mate Madel Odi Sary Typ Type (M, (pill Ron own Lam
1 2,9524 2,514.1 Carbon RK 1112 GAS LIFT GLV RK 0.188 1,241) 1QW019
2 5,268.3 3.765.3 Comes RK 1112 GAS LIFT OV RK 0,250 0.0 lQ2QD19
3 6,9692 4.789.6 Camm RK 112 GAS UFT DMY RK 0.000 0.0 1/102019
4 8.1759 5,538.8 Call RK 112 GAS LIFT DMY RK 0000 0.0 111UM19
5 906)] 6,090.2 Camco RK 1112 GAS UFT DMY RK 0.000 0.0 11102019
6 9,6234 6440.5 Camco RK 11Q GAS LIFT DMY RK 0.000 0.0 1/11/2019
Notes: General & Safety
End Dale i Anowenon
IPERF; 9,m4.ob.8a1.0�
]11412010 1 NOTE: View Schematic cal Alaska Schemafc9.0
111712018 NOTE'. View Schematic w/Ataska Schematic 100
WEDGE P55Y'. 8.815.3
NIPPLE', 8,82.3
IFERF, a93O09,95 O.
WEC(iEA85Y:991a.1
281 X leck;9.9asI.0
MpFLE; 8.0"A.O
IPERF:SMO10,O O.
Feep PUERTO
FISH; 10,0610
PRODUCTION; Mi10.2580
CTp.MnnALMaI:
9.eF6
3C -08A Final CTD Schematic
16" 62# H-40 shoe
@ 116' MD
9-5/8" 36# J-55
shoe @ 5206' MD
I KOP@9,936MD I
A -sand parts
9904'- 8921' MD
9836' - 9954' MD
9976' - 10004' MD
7" 26# J-55 shoe @
10,258' MD
3-1/Z'9.3# L-80 EUE Tubing to surface
3-1/2" x 1-1/2" MMG Cameo gas lift mandrels @ 2955',
5271', 6972', 8179'. 9071 & 9626'MD.
Baker Premier packer @ 9655' MD
3-1/2" X -Nipple @ 9679' MO (2.813" min ID)
Top of Tandem Wedge #1 Ass @ 9910' MD
3-1/2" X -Nipple @ 9928' MD (2.813" min ID)
Top of Tandem Wedge #2 Ass @ 9929' MD
3 -1/2'X -Nipple @ 994T MD (2.813" min ID)
Tubing tail @ 9960' MD
Proused CTO Cornaletion
Run Length
Description
Depth
ID
Ball OD
Post Rig
SST -SPAN Liner T.p
PTSA Tie -Back Seals
1 1.877
1 1.781
10 Seal Bore De 10 ment 5 save
9,830'
2.250
2-3/8" Blank Liner, 4.60ll8, LSO, Hyd511
R Prole Nipple
9,872'
1.781
2A/e" Blank Liner, 4.608, LA0, Hyd511
Stg 4. Ball Dmp Frac Sleeve
10,610'
1.656
1.718
1
23/8" Blank Liner, 4.6#tl( LA0, H d511
Stg 3 Ball Drop Frac Sleeve
11,053'
1.563
1.625
2-318" Blank Liner, 4.6#tt, LA0, Hyd511
St 2: Ball Dro Frac Sleeve
11.302'
1.438
1.500
2S/8" Blank Liner, 4.6#m, LA0, Hyd511
Stg 1: Pert Joint (0.281", 3 SPF, 60')
12,027'
Aluminum Ported Bull Nose
1.000
1.375
3C -OSA TD = 12246 MD
2-3/e" blank liner w/ frac sleeves & pedjoint
TOL = 9,830' MD, BOL = 12,246' MD
-3C-08APB2 TO = 1 O
Anchored billet = 10,490',499 MO
Anchored bklet = 10,510' MD (failetl)
3C-0BAPBi TD = 11,215' MD
Anchored billet = 10,290' MD
Operations Summary (with Timelog Depths)
3C -O8
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
De
Stan�p�
St
Start Time
End Time
Dur(ho
Phase
Op case
Activity code
Time
me P -T -X
Operation
Eno Depth (ftK8)
12/20/2018
12/20/2018
2.00
MIRU
MOVE
RURD
P
Continue RD checklist, breakdown TT
0.0
0.0
09:00
11:00
hard line, secure BOP & reel
12/20/2018
12/20/2018
2.00
MIRU
MOVE
RURD
P
Disconnect PUTZ, move mats away
0.0
0.0
11:00
13:00
from rig exterior, complete RD
checklist, break down tree platform,
Peak trucks arrive on pad
12/20/2018
12/20/2018
1.00
MIRU
MOVE
RURD
P
PJSM, rig up shop & 1/2 -way house
0.0
13:00
14:00
12/20/2018
12/20/2018
1.50
MIRU
MOVE
RURD
P
PJSM, rig up to sows, pull mats, pull
0.0
0.0
14:00
15:30
off well, jeep up
12/20/2018
12/20/2018
2.00
MIRU
MOVE
MOB
P
Move from 1B -Pad to 3C -Pad
0.0
0.0
15:30
17:30
12/20/2018
12/20/2018
1.00
MIRU
MOVE
MOB
P
Hold at the Y for field and rig crew
0.0
0.0
17:30
18:30
change.
12/20/2018
12/20/2018
2.50
MIRU
MOVE
MOB
P
Roll out toward 3C-08,
0.0
0.0
18:30
21:00
Short pause < 5 min @ 1Q to let traffic
by.
20:30 pas CPF3
12/20/2018
12/20/2018
0.40
MIRU
MOVE
MOB
P
On pad - 21:00. Contact DSO, Paul,
0.0
0.0
21:00
21:24
nights lead. Permission obtained to
back over well and RU. S/1 OA, all
other valves closed. IA 1,300 psi, OA
200 psi.
"' Note Well has a BPV installed.
Drop both sub and service mod jeeps.
12/20/2018
12/20/2018
0.75
MIRU
MOVE
RURD
P
Spot Sub over well, leaning tree.
0.0
0.0
21:24
2209
12/20/2018
12/20/2018
0.25
MIRU
MOVE
RURD
P
Tuck in mats around perimeter.
0.0
0.0
22:09
22:24
12/20/2018
12/20/2018
0.30
MIRU
MOVE
RURD
P
Mats in, lifted stack to clear blanking
0.0
0.0
22:24
2242
flange on top of tree.
12/20/2018
12/20/2018
0.30
MIRU
MOVE
RURD
P
Set down sub, DTH started install of
0.0
0.0
22:42
23:00
scaffold well platform. Sot service mod
next to sub
12/20/2018
12/20/2018
0.60
MIRU
MOVE
RURD
P
Service mod in place, tuck mats under
0.0
0.0
23:00
23:36
12/20/2018
12/21/2018
0.40
MIRU
MOVE
RURD
P
Set down Service mod, rig spotted an
0.0
0.0
23:36
00:00
level, drop landings and stairs.
12/21/2018
12/21/2018
5.00
MIRU
MOVE
RURD
P
PJSM, lunch, Start working RU
0.0
0.0
00:00
05:00
checklist. Set stack @ 3:00. Hard line
to tiger tank rigged up and tested to
air.
12/21/2018
1221/2018
2.00
MIRU
MOVE
NUND
P
Continue RU check list, NU BOP
0.0
0.0
05:00
07:00
•' Rig Accepted: 12/21/18 @ 07:00 hrs
12/212018
12/21/2018
1.00
MIRU
MOVE
RURD
P
Complete RU checklist, grease swab,
0.0
0.0
07:00
08:00
tangos, & HCR's
12/21/2018
12/21/2018
0.50
MIRU
WHDBOP
PRTS
P
Fluid pack lines
0.0
0.0
08:00
08:30
12/21/2018
12/21/2018
0.50
MIRU
WHDBOP
PRTS
P
Shell test, good, PT TT line to 2300
0.0
0.0
08:30
09:00
psi (begin bleeding off IA), test gas
alarms
12/21/2018
1221/2018
2.10
MIRU
WHDBOP
BOPE
P
BOPE test
0.0
0.0
09:00
11:06
•' Per PTD, 250 psi low, 4500 psi high
(witness waived by Matt Herrera of
AOGCC)
12/21/2018
12/21/2018
0.60
MIRU
WHDBOP
BOPE
T
Difficulty holding low on test#5, close
0.0
0.0
11:06
11:42
C8, hold on low, grease C7 (fail pass
on C7)
Page 1117 ReportPrinted: 1/21/2019
Operations Summary (with Timelog Depths)
3C-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Start Time
End Time
our (hr)
phase
Op Code
Activity Code
Time P -T -X
Operation
(RKB)
End Depth (WB)
12/21/2018
12/21/2018
3.80
MIRU
WHDBOP
BOPE
P
Continue BOP test, install test joint,
0.0
0.0
11:42
15:30
continue test, check N2 levels, draw
down test, RD test int
(Bled IA down to 850 psi)
12/21/2018
12/21/2018
3.00
MIRU
WHDBOP
MPSP
P
Clear floor, suck out riser, PJSM, rig
0.0
0.0
15:30
18:30
up lubricator, PT lubricator to 2300 psi,
not showing on lubricator gauge,
trouble -shoot, pull BPV, LD
lubricator,crew change
12/21/2018
12/21/2018
1.60
MIRU
WHDBOP
PRTS
P
Test IRV, PT PDLS's
0.0
0.0
18:30
20:06
12/21/2018
12/21/2018
1.80
PROD1
RPEQPT
PULD
P
PU & PD BHA#1, NS whipstock.
0.0
74.0
20:06
21:54
Check packoffs, change.
12/21/2018
12/22/2018
2.10
PRODi
RPEQPT
TRIP
P
RIH,pumping min rate, taking returns
74.0
8,333.0
21:54
00:00
to the tiger tank. WH 1128 psi,
12/22/2018
12/2212018
0.20
PRODt
RPEQPT
TRIP
P
RIH,pumping min rale, taking returns
8,333.0
9,372.0
00:00
00:12
to the tiger tank. WH 1128 psi,
12/22/2018
12/22/2018
0.20
PRODt
RPEQPT
DLOG
P
Tie into the K1 for -3' correction.
9,372.0
9,406.2
00:12
00:24
12/22/2018
12/22/2018
0.30
PROD1
RPEQPT
TRIP
P
RIH to lowest loggin depth (9850')
9,406.2
9,598.0
00:24
00:42
since no WOB when logging W CCL
PU Wt 40 k lbs.
12/22/2018
12/22/2018
0.70
PROD1
RPEQPT
DLOG
P
Log CCL from 9550-9750'@ 16 ft/min.
9,598.0
9,947.0
00:42
01:24
Log appears to be off by 4.
S/D @ 9947',
12/22/2018
12/22/2018
0.30
PROD1
RPEQPT
TRIP
P
PU 40 dips, PUH to relog the K1
9,947.0
9,301.0
01:24
01:42
12/22/2018
12/22/2018
0.80
PROD1
RPEQPT
DLOG
P
Tie into the K1 for no correction
9,301.0
9,429.0
01:42
0230
12/22/2018
12/22/2018
0.80
PROD1
RPEQPT
WPST
P
RBIH, S/D @ 9946' Set 2 k WOB,
9,429.0
9,946.0
02:30
0318
consult with town enginedng. PU 36k
to neutral weight. Close EDC, Pump
0.5 bpm, Sheared at 3300 psi, 4 k
WOB.
`•' TOWS @ 9934'0 'ROHS
12/2212018
12/22/2018
2.80
PROD1
RPEQPT
TRIP
P
PU 40 k lbs, PUH, swap to DuoVis
9,946.0
80.0
03:18
06:06
milling fluid, new mud at the bit @
9899'.
POOH pumping 2.4 bpm holding 11.8
ppg @ the window, 1forl returns,
metal over shakers & packed -off MM
at surface, PJSM
12/22/2018
12/22/2018
1.30
PRODi
RPEQPT
PULD
P
PUD & LD BHA #1 (pumping MP)
80.0
0.0
06:06
07:24
12/22/2018
12/22/2018
1.00
PROD1
WHPST
PULD
P
PD BHA#2 Window Milling Assembly
0.0
74.0
07:24
08:24
(0.6° AKO motor, string reamer, &
window mill), slide in cart, check pack -
offs, MU to coil, tag up
12/22/2018
12/22!2018
1.60
PROD1
WHPST
TRIP
P
RIH w/ BHA#2
74.0
9,385.0
08:24
10:00
12122/2018
12/22/2018
0.20
PRODt
WHPST
DLOG
P
log K1 for -4.5' correction, PUW =
9,385.0
9,410.0
10:00
10:12
34K, close EDC
12122/2018
12/22/2018
0.40
PROD1
WHPST
TRIP
P
Continue RIH, dry tag WS pinch -point
9,410.0
9,935.2
10:12
10:36
@ 9936', PUW = 37K, tag pumping at
9935.2
Page 2117 Report Printed: 1/2112019
. Operations Summary (with Timelog Depths)
3C-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our inn
Phase
Op Cooe
Acfi Aq Code
Tim P -T -x
Operation
(RK8)
End Depth(11KS)
12/22/2018
12/22/2018
1.70
PRODt
WHPST
WPST
P
Milling window per procedure, HS, FS
9,935.2
9,936.6
10:36
12:18
= 460 psi Q 1.9 bpm, CWT = 14.3K,
WOB = 1.1 K, BHP = 4030 psi, WHP =
456 psi, circ = 4433 psi, IA = 891 psi,
milling slows down -1 ft in, avg ROP =
0.82 pfh
12/22/2018
12/22/2018
2.30
PROD1
WHPST
WPST
P
Milling, CWT = 12K, WOB = 2.8K, dp
9,936.6
9,937.4
12:18
14:36
= 677 psi, avg ROP = 0.35 fph
"Preload DS PDL w/ build BHA
12/22/2018
12/22/2018
2.00
PROD1
WHPST
WPST
P
Milling, CWT = 12K, WOB = 2.9K, dp
9,937.4
9,938.5
14:36
16:36
= 676 psi, avg ROP = 0.55 fph
12/22/2018
12/22/2018
1.40
PROD1
WHPST
WPST
P
Milling, CWT =11.7K, WOB =3.OK,
9,938.5
9,939.0
16:36
18:00
circ = 4343 psi, BHP = 4085 psi, WHP
= 397 psi
12/22/2018
12/23/2018
6.00
PROD1
WHPST
WPST
P
Milling, CWT = 15K, WOB = 2.9K, circ
9,939.0
9,141.4
18:00
00:00
= 4524 psi, BHP = 4069 psi, WHP =
377 psi
12/23/2018
12/23/2018
0.90
PRODi
WHPST
WPST
P
Milling, CWT= 11.6K, WOB =2.7K, dp
9,141.4
9,141.6
00:00
00:54
= 657 psi, circ = 4374 psi, BHP = 4086
psi, WHP= 399 psi
12/23/2018
12/23/2018
2.30
PROD1
WHPST
WPST
P
Stall, PU 38 k lbs, RBIH
9,141.6
9,941.7
00:54
0312
CWT =17klbs, WOB =2.7k lbs, dip=
481 psi, circ = 4492 psi, BHP = 4048
psi, WHP = 361 psi
12/23/2018
12/23/2018
2.10
PROD1
WHPST
WPST
P
Stall, PU 41 k lbs pull -5 k WOB, RBIH
9,941.7
9,941.3
03:12
05:18
CWT = 15 k lbs, WOB = 1.2 k lbs, dp
= 517 psi, circ = 4521 psi, BHP = 4031
psi, WHP = 332 psi
Weight not milling off. holdin 2.10
MOB
12/23/2018
12/23/2018
1.90
PROW
WHPST
TRIP
P
Confer w/ town, decision made to
9,941.3
74.0
05:18
07:12
POOH to inspect tools, PJSM
12/23/2018
12/23/2018
0.80
PROD1
WHPST
PULD
P
PUD, pumping MP, string reamer &
74.0
0.0
07:12
08:00
mill gauged 2.79" no-go, pictures of
mill on S: drive, DD inspected motor
which looked good
"SIMOPS: swap out Charlie 7
12/23/2018
12/23/2018
0.80
PROD1
WHPST
PULD
P
PD BHA#3, new window mill (2.80" no
0.0
74.0
08:00
08:48
-go), slide in cart, check pack -offs, MU
Ito
coill, tag up
12/23/2018
12/23/2018
1.70
PROD1
WHPST
TRIP
P
RIH w/ BHA#3, newwindow mill
74.O
9,385.0
08:48
10:30
" Park (03 795', close EDC, FS = 514
psi @ 1.9 bpm, confer w/ town,
continue in-hole
12/23/2018
12/23/2018
0.10
PROD1
WHPST
DLOG
P
Log Kt for +1' correction, PUW = 32K
9,385.0
9,404.0
10:30
10:36
12/23/2018
12/23/2018
0.30
PROD1
WHPST
TRIP
P
Continue RIH, dry tag deepest depth
9,404.0
9,941.6
10:36
10:54
@ 9941.7', PUW = 40K, slight motor
work at 9941.2', easily through, milling
from 9941'6
12/23/2018
12123/2018
1.70
PROD1
WHPST
WPST
P
Milling, FS = 500 psi @ 1.9 bpm, CWT
9,941.6
9,943.5
10:54
12:36
= 13K, WOB = 2K, circ = 4528, BHP =
4041 psi, WHIP = 369 psi, dp = 614
psi, WOB falls off beginning
9942.5' (BOW), control mill @ tfph,
allow string reamer to exit 7"
" TOW & TOWS = 9935.2', BOW =
9942.5', 7.3' window
Page 3117 Report Printed: 1/21/2019
Operations Summary (with Timelog Depths)
3C-08
'
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Time
EtlTm
Dur(nh
Phage
Op Code
Ac9vftyCotleTimeP-T-X
operation
start Depth
(WB)
End Depth (ftKB)
12/23/2018
12/23/2018
1.50
PROD1
WHPST
MILL
P
Milling rat-hole, CWT = 13.SK, WOB =
9,943.5
9,960.0
12:36
14:06
2.4K, BHP = 4055 psi, WHP = 368 psi,
sand in samples
12/23/2018
12/23/2018
2.20
PROD1
WHPST
REAM
P
Perform reaming passes, HS, 30R,
9,960.0
9,960.0
14:06
16:18
30L, & LS (2 passes) @ 1 fpm, dry
drift, clean up & down, tag rat-hole TD,
pump sweeps, PUW = 37K
12/23/2018
12/23/2018
1.70
PROD1
WHPST
TRIP
P
POOH, Crewchange, PJSM,
9,960.0
74.0
16:18
18:00
12/23/2018
12/23/2018
1.50
PRODt
WHPST
TRIP
P
Bump up, PUD & LD BHA#3.
74.0
0.0
18:00
19:30
"`Speed mill 2.80" No Go
12/23/2018
12/23/2018
0.90
PROD1
DRILL
CIRC
P
MU side jet noule, stab on, jet stack.
0.0
0.0
19:30
20:24
12/23/2018
12/23/2018
1.00
PROD1
DRILL
PULD
P
Unstab, PD BHA # 4, 2.2 °AKO w/ BH
0.0
72.2
20:24
21:24
TX19610 rebuilt bit. Inspect pack offs,
-shot, clean everything, reinstall new
with new extrusion rings. Bump up,
space out.
12/23/2018
12/23/2018
1.70
PROD1
DRILL
TRIP
P
RIH. turning coil over to clean duovis
72.2
9.370.0
21:24
23:06
Fluid.
12/23/2018
12/23/2018
0.20
PROD1
DRILL
DLOG
P
Tie into the K1, miss tie in, PU to
9,370.0
9.404.0
23:06
23:18
9354', tie in for +14.5'.
12/23/2018
12/23/2018
0.40
PROD1
DRILL
TRIP
P
Continue to RIH, new mud at the bit
9,404.0
9,56-00-
23:18
23:42
9810', Park. Close EDC, continue to
RIH, window clean.
12/23/2018
12/24/2018
0.30
PROD1
DRILL
DRLG
P
CT 4510 psi @ 1.89 bpm in, 1.80 bpm
9,960.0
9,997.0
23:42
00:00
out, Delta P= 537 psi BHP 4055 psi.
WH 250 psi IA 801 psi, 288 psi.
OBD, CT Wt 13.4 k IDS,
WOB 1.24 k lbs, ROP 100 ftlhr
12/24/2018
12/24/2018
0.90
PROD1
DRILL
DRLG
P
CT 4856 psi @ 1.88 bpm in, 1.88 bpm
9,997.0
10,070.0
00:00
00:54
out, BHP 4093 psi, 11.78 ppg EMW @
the window.
CT Wt 15.7 k lbs, WOB 1.7 k lbs, ROP
144 ft/hr
Ran into something hard @ 10,059',
ROP dropped to - 40 ft/hr
12/24/2018
12/24/2018
1.80
PROD1
DRILL
TRIP
P
PU 41 k lbs, POOH for lal drillig
10,070.0
67.0
00:54
02:42
assembly, neg 1.5k lbs WOB tug
coming throuhg the window - 9944',
Park, open EDC, continue to POOH.
bump up.
12/24/2018
12/24/2018
0.70
PROD1
DRILL
PULD
P
Space out, PUD BHA # 4.
68.2
68.4
02:42
03:24
12/24/2018
12/24/2018
1.70
PRODt
DRILL
PULD
T
DS PDL wire appeared to part when 2-
68.2
0.0
03:24
05:06
3/8" deployment rams were opened.
Close 2-3/8" deployment rams, blow
down lubricator, Pop off lubricator,
confirm wire parted. Appears to be a
couple feet above the rope socket.
Set down PDL. PJSM for change of
scope. Skid injector cart toward PDL
for use as work platform, EDC down
15.2', should be spaced out right
below to lower 2-3/8" deployment ram.
Closed bag for additional barrier from
well. Retrieve wire.
12/24/2018
12/24/2018
0.90
PROD1
DRILL
PULD
T
Slipe wire and begin rehead.
68.2
0.0
05:06
06:00 1
1
Page 4117 Report Printed: 112112019
Operations Summary (with Timelog Depths)
3C-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Depth
Sten(13)
Stan Time
End Imre
Our hr
( )
Phase
Op Code
Activity Code
Time P -T -X
Opefation
(ttKB)
Entl Depth (flKB)
12/24/2018
12/2412018
1.80
PROM
DRILL
PULD
T
Crew change, stand back DS PDL,
0.0
0.0
06:00
07:48
move ODS PDL over mouse -hole,
work to free SL, attach sash cord to
tools & tie -off to riser, payout slack on
SL & PU w/ PDL, BHA moves, add
additional tools to bottom of tools in
PDL (more hanging weight), work SL
up & down, free
LD tools from ODS PDL (2nd window
milling BHA)
12/24/2018
1212412018
0.90
PRODI
DRILL
PULD
P
PUD BHA#4, bit came out a 1-1 (one
0.0
0.0
07:48
08:42
chipped reamer cutter)
12124/2018
12/24/2018
1.30
PROM
DRILL
PULD
P
PD BHA#5 Lateral Assembly (NOV
0.0
78.0
08:42
10:00
Agitator, 0.5° AKO motor, & HYC A3
bit), slide in cart, check pack -offs, MU
to coil, tag up, set counters
12/24/2018
12/24/2018
1.80
PROD1
-DRILL
TRIP
P
RIH w/ BHA #5, close EDC, surface
78.0
9,380.0
10:00
11:48
test agitator, good
Shallow test: 1.9 bpm, rip = 1276 psi,
circ = 5320 psi (transducer currently
down, scavenged parts for MWD)
Begin reheading SL on DS PDL
12/2412018
12/24/2018
0.10
PROD1
DRILL
DLOG
P
Log K1 for -4' correction, PUW = 35K,
9,380.0
9,402.0
11:48
11:54
begin sending PowerPro system #1
12/24/2018
12/24/2018
0.40
PROD1
DRILL
TRIP
P
Continue RIH, log RA @ 9940'
9,402.0
10,070.0
11:54
12:18
TOWS & TOW = 9935.2', BOW =
9942.5'
12/24/2018
12/24/2018
0.70
PROD1
DRILL
DRLG
P
Drilling, 1.86 bpm, CWT= 14K, WOB
10,070.0
10,145.0
12:18
13:00
= 1.3K, BHP = 4113 psi, WHIP = 286
psi, circ = 5274 psi, new mud a bit
10,080', dp = 1459 psi, PUW = 41 K
From 10,145'to get new parameters
12/24/2018
12/24/2018
1.30
PRODI
DRILL
DRLG
P
Drilling. FS = 1264 psi, @ 1.87 bpm,
10,145.0
10,343.0
13:00
14:18
CWT = 14.7K, WOB = 1.1 K, BHP =
4055 psi, WHP = 461 psi, circ = 4982
psi, PUW = 4K from 10,337'
"Agitator transducer functioning again
12/24/2018
12/24/2018
0.80
PRODI
DRILL
WPRT
P
Geo wiper, PUW = 42K, PUH to
10,343.0
10,343.0
14:18
15:06
window (call wiper #1)
12/24/2018
12/242018
3.00
PRODI
DRILL
DRLG
P
Drilling, CWT= 15.51K, WOB = 2.6K,
10,343.0
10,795.0
15:06
18:06
BHP = 4129 psi, WHIP = 424 psi, circ
= 5300 psi, pump 5x5 sweep
12/24/2018
12/24/2018
0.50
PROD1
DRILL
WPRT
P
Wiper up -hole, PUW = 41 K, see a bit
10,795.0
10,095.0
18:06
18:36
of motorwork at 10,425', RIH, stacking
at 10,445', PUW = 52K, dragging to -
3K WOB.
Watch higher gamma interval
('130,330 to 10,500)
1224/2018
12/24/2018
1.10
PROD1
DRILL
WPRT
P
Wiper in-hole, slack weight at 10,350'
10,095.0
9,365.0
18:36
19:42
through to 10,402' (up to —4K WOB),
PUW = 45K, drop rate to 1.5 bpm,
stack 6K WOB @ 10,436', PUH to
window, confer w/ town, agree to
attempt to reduce rate to get through
higher gamma interval
Pump sweeps, pull into cased hole,
circulate bottoms up, PUH to Kt
Page 5/17 Report Printed: 1121/2019
Operations Summary (with Timelog Depths)
3C-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Sten Depth
slaty rune
End Time
Dur (hr)
Phase
Op Code
Activity CMe
Time P -T -X
Operation
(ftKB)
Eq DepM (ftKB)
12/24/2018
12/24/2018
0.20
PROD?
DRILL
DLOG
P
Log Kt for+3' correction
9,365.0
9,995.0
19:42
19:54
12/24/2018
12/24/2018
0.70
PROD1
DRILL
WPRT
P
RBIH, stack weight at 10,463'@ 1.25
9,995.0
10,795.0
19:54
20:36
bpm, PUW = 45K, attempt at 0.5 bpm,
get through clean past 10,525, begin
ramping rate back up to drilling rate
once past high gamma interval, PUW
= 46K from 10,640', annular fluctuates
w/ slight pack -off events, stack weight
at 10,630, PUW = 53K, pump sweeps,
RIH to bottom
12/24/2018
12/24/2018
1.00
PROD1
DRILL
DRLG
P
Drilling, CWT= 13.7K, WOB = 2K,
10,795.0
10,957.0
20:36
21:36
BHP = 4132 psi, WHIP = 260 psi
12/24/2018
12/24/2018
1.30
PROD1
DRILL
WPRT
P
Projections indicate potential of not
10,957.0
10,957.0
21:36
22:54
staying in southern edge of polygon,
confer w/ town, PUH slowly as
decison is made (currently requires
-8° OLS to stay within polygon),
souhern polygon border extended,
return to drilling
12/24/2018
12/25/2018
1.10
PROM
DRILL
DRLG
P
CT 51180 psi @ 1.9 bpm in, 1.9 bpm
10,957.0
11,128.0
22:54
00:00
out, Delta P 1226 psi, BHP 4130 psi
CT Wt 12.8 k WOB 2 k lbs, ROP
average overr interval - 155
12/25/2018
12/25/2018
0.40
PROM
DRILL
DRLG
P
CT 51180 psi @ 1.9 bpm in, 1.9 bpm
11,128.0
11,215.0
00:00
00:24
out, Delta P 1226 psi, BHP 4130 psi
CT Wt 12.8 k WOB 2 k lbs, ROP
average over interval - 155
Launch 5x5 in anticipation of wiper
trip, chase out of hole.
Average ROP over interval 217 ft/hr
12/25/2018
12/25/2018
1.00
PROD1
DRILL
WPRT
P
PU 43 k lbs on wiper #1, send 5x5
11,215.0
9,950.0
00:24
01:24
sweep. CT Wt - 38 k lbs.
10416' , start pulling heavy, up to 50 k,
-5 k Is WOB
RBIH, stack out @ 10420, CT 4 k lbs,
WOB 2k lbs
Work pipe, stack out again 10429, 7.8
k lbs WOB.
PUH Ct 37. k lbs dragging - 1 k lbs,
Cleaned up around 10,300'
Off bottom sweep landed, lots of dirt,
no rocks.
Second sweep similar returns, slightly
larger caving's, very small.
Cuttings ratio climbed from 0.98 pre
trip to 1.0
12/25/2018
12125/2018
0.20
PROD1
DRILL
DLOG
P
Tie into the RA tag for correction.
9,950.0
9,974.7
01:24
0136
Page 6117 ReportPrinted: 112112019
Operations Summary (with Timelog Depths)
3C-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Tune P -T -X
Operabon
(ftKB)
End DepM (MKB)
12/25/2018
12/25/2018
0.50
PROD1
DRILL
WPRT
T
RBIH,
9,974.7
10,535.0
01:36
02:06
Reduce pump rate to 1.5 bpm before
suspect trouble zone, 10300-
10500'.10,402' S/D CT Wt to 7 k WOB
to 5 k Ibs
PU 41 k lbs, pull to 10311', dragging
up to -3 k WOB, RBIH
10,630', Start stacking coil wt and
seeing annular up to 4400 psi, packing
off
PU, 43 k lbs, PUH, to 10,610'
RBIH,start @ 0.6 bpm, ramp up to 1
bpm.
10,640, Annular to 4653, packing off,
13.5 EMW at the window.
Work pipe and vary pump rate trying
to clean up circulation, launch sweep.
12/25/2018
12/25/2018
0.50
PROD1
DRILL
TRIP
T
PUH,
10,535.0
9,918.0
02:06
02:36
10448', start pulling heavy, RBIH, SID
PU, 58 k CT Wt -14 k WOB, 10,436
work pipe.
10,382, Ct 56k lbs, -7 k lbs, send 5x5.
Cleaned up @ 10,290'
Window clean
12/25/2018
12/25/2018
1.00
PRODt
DRILL
TRIP
T
Sweep landed, full of larger sillstone.
9,918.0
10,330.0
02:36
03:36
CR up to 1.05 now.
Pump 5x5 sweep, RBIH on clean out
Fun.
12/25/2018
12/25/2018
2.20
PROD1
DRILL
TRIP
T
POOH chasing sweeps to surface,
10,330.0
72.7
03:36
05:48
window clean.
12/25/2018
12/25/2018
1.90
PROD1
DRILL
PULD
T
Crew change, PJSM, alempl to PUD
72.7
0.0
05:48
07:42
with DS PDL. Frozen. Swap to ODS
PDL, PUD BHA#5. Bit came out 1, 1.
12/25/2018
12125/2018
1.20
FROM
STK
PULD
T
PU & PD BHA #6, open hole anchored
0.0
72.8
07:42
08:54
billet. Verify EDC open,
12/25/2018
12125/2018
1.60
FROM
STK
TRIP
T
RIH
72.8
9,385.0
08:54
10:30
12/25/2018
12/25/2018
0.20
FROM
STK
DLOG
T
Tie into the K1 for a 4 correction.
9,385.0
9,407.1
10:30
10:42
12/25/2018
12/25/2018
0.20
FROM
STK
TRIP
T
PU Wt 35 k lbs, Continue to RIH.
9,407.1
9,900.0
10:42
10:54
Park at 9900
12/25/2018
12/25/2018
0.30
FROM
STK
WAIT
T
Wait on setting depth and slip
9,900.0
9,900.0
10:54
11:12
orientation from town.
12/25/2018
12/25/2018
0.30
FROM
STK
WPST
T
Receive orders from engineering,
9,900.0
10,301.2
11:12
11:30
Close EDC, RIH, window clean,
PU 33k slack, Slips oriented 150
ROHS, CT Wt 33.41 k lbs, WOB 0.37
k lbs, Pump on 0.5 bpm, sheared at
4300 psi, WOB climbed to 3.68 klbs,
SID 5.5 k lbs
12/25/2018
12/25/2018
1.80
PROD1
STK
TRIP
T
PU 36 k lbs, POOH.
10,301.2
72.0
11:30
13:18
12/25/2018
12/25/2018
1.00
FROM
STK
PULD
T
Bumped up, PUD BHA #6.
72.0
0.0
13:18
14:18
12125/2018
12125/2018
1.20
FROM
STK
PULD
T
PU # PD BHA V. A Lateral drilling
0.0
72.0
14:18
15:30
assembly. inspect pack offs, - great.
12/25/2018
12125/2018
1.80
FROM
STK
TRIP
T
RIH W BHA#7-A lateral drilling
72.0
9,380.0
15:30
17:18
assembly, Close EDC, Shallow test
agitator, 1010 psi diff.
12/25/2018
12125/2018
0.20
FROM
STK
DLOG
T
Tie into the K1 for -3.5" correction.
9,380.0
9,399.3
17:18
17:30
Page 7117 Report Printed: 1121/2019
GrnyrOperations Sumary (with Timelog Depths)
3C-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Our (hr)
Phase
Op Code
Activity Code
Time P -T -x
Operation
Drytag@
(WE)
End Depth (WB)
0
,290.0
12/25/2018 72/25/2018
0.30
PROD1
STK
TRIP
,
pump parameters
17:30 17:48
2.25
PROLJ
STK
KOS7
T
Start time milling, 1.9 bpm @ 5,303-1-0,-290.0
10,290.7
12/25/2018
72/25/2018
,
psi, WHPstall BHP2904',,
17:48
20:03
0,290,
OA=304, stall @ 10,290.4', 10,290 44,
10,290.68, and 10,290.68', PUH, PUW
39 k, circulate 5x5 tubed pill down coil.
load
additional lubes from hot shack.
12/25/2018
12/25/2018
0.60
PROD1
STK
KOST
T
Attempt to kickoff billet 1.52 bpm @
10,290.7
10,290.7
4,052 psi FS, WHP=206, BHP=4,147,
2003
20:39
IA=204, OA=303, stall again
10,290-64', PUW 39 k
12/25/2018
12/2512018
0.70
PROD1
STK
KOST
T
Circulate 25 bbl tubed pill 1.8 bpm @
--T—O,-290.7
10,290.8
4,989 psi, WHP=208, BHP=4,148,
20:39
21:21
IA=822, OA=304, stall again
10,290.64'
12/25/2018
12/25/20111
0.70
PROD1
STK
KOST
T
4.1�mp11'It kickoff let b print4,@147,
-T0,2908
10,291.0
BHP
21:21
22:03
IA 822 OA=304, stall again 10,290.8'
12/25/2018
12/25/2018
0.50
PROD1
STK
KOST
T
Circulate 50 bbl beaded drilling fluild
10,291.0
10,291.0
pill, 1.8 bpm @ 5,069 psi FS,
22:03
22:33
WHP=211, BHP=4,147, IA=822,
OA=304
—7-0-291.2
12/25/2018
12/25/2018
—1 35
PR0D1
STK
KOST
T
Time Milling @ 1 ft/hr
--TD--291.0
22:33
12/2512018
23:54
12/26/2018
0.10
PROD1
STK
KOST
T
Time Milling @ 2 ft/hr
---70—,292 .2
10,292.2
23:54
00:00
STK
KOST
T
Time Milling @ 2 ft/hr, 1.8 bpm @
--7--,291.7
10,292.0
12/2612018
12/26/2018
0.30
PROD1
5,069 psi, WHP=202, BHP=4,148,
00:00
00:18
IA=818, OA=303
12/26/2018
12/26/2018
—030
PROD1
STK
KOST
T
Time Milling @ 3 ft/hr, 1.8 bpm @
10,292.0
--1-02-93.0
5,069 psi, WHP=202, BHP=4,148,
00:18
00:36
IA=818, OA=303
72126/2018
-1-2/26/2018
0.30
PR
STK
KOST
T
Time Milling @ 4 ft/m, 1.8 bpm @
10,293.0
10,294.0
5,069 psi, WHP=202, BHP=4,148,
00:36
00:54
IA=818, OA=303
12/26/2018
12/2612018
0.30
PROD1
STK
KOST
T
Control drill ahead, 1.8 bpm @ 5,069
10,294.0
10,303.0
psi, WHP=202, BHP=4,148, IA=818,
00:54
01:12
OA=303
12/26/2018
12/26/2018
0.90
PROD1
DRILL
DRLG
T
Drill Ahead @1.8 bpm @ 51069 psi,
10,303.0
10,437.0
WHP=202, BHP=4,148, IA=818,
01:12
02:06
OA=303
12/26/2018
12/26/2018
0.50
PROD1
DRILL
TRIP
T
Stall Motor, PUW 39 k, bring pump on-
10,437.0
9,907.0
line, seems to be locked up, continue
02:06
02:36
PU slowly, line up across the top,
holding MP schedule continue Pulling
into tubing. Line back up down the
coil, still locked up, bleed pump down.
12/26/2018
12/26/2018
1.00
PR0D
DRILL
TRIP
T
Open EDC, POOH, started plugging
"A",
9,907.0
3,343.0
off choke, swap to choke flush
02:36
03:36
choke "B", looks like we plugged off
choke "A", line back up on choke "B",
both chokes plugged off, park at
3,343', blow down chokes, found there
to be aluminum peices and stator
rubber,
12/26/2018
12/26/2018
0.75
PROD1
DRILL
TRIP
T
Startel
pluflus hch chke oke, swap to
3,343.0
3,343.0
choked looks like
03:36
04:21
we plugged off choke "A", line back up
on choke "B", both chokes plugged off,
park at 3,343', blow down chokes,
found there to be aluminum pieces
and multiple stator rubber pieces,
Page 8117 ReportPrinted: 1121/2019
Operations Summary (with Timelog Depths)
Y-yp
X-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Stan Time
End Time
Dur (hr)
Phase
Op Code
Ae Vdy Code
Tone P -T -X
Operatlon
(WB) I
End Depth (W13)
12/26/2018
12/26/2018
1.00
PROD1
DRILL
TRIP
T
Continue POOH, taking returns back
3,343.0
77.0
04:21
05:21
through choke "B"
12/26/2018
12/2612016
1.50
PRODi
DRILL
PULD
T
Bump up, PUD BHA#7, Crew
77.0
0.0
05:21
06:51
Change, PJSM, Contine to PUD.
12/26/2018
1212612018
1.20
PROD1
DRILL
PULD
T
PU BHA#8, new for us motor, and
0.0
78.2
06:51
08:03
agitator, RB P104 Baker bit.
Stab on, inspect pack offs, bump up,
Pet ounters.
12/26/2018
12/26/2018
1.70
PROD1
DRILL
TRIP
T
RIH, park shallow, close EDC, Shallow
78.2
9,380.0
08:03
09:45
test agtator, deka P @ 1.8 bpm = 1095
psi. Continue to RIH.
1212612018
12/26/2018
0.20
PROD1
DRILL
DLOG
T
Tie into the K1 for +4' correction.
9,380.0
9,427.0
09:45
09:57
Geo, questioned the tie in, will log RA.
12/26/2018
12/26/2018
0.20
PROM
DRILL
TRIP
T
Continue to RIH, Window clean
9,427.0
9,963.0
09:57
10:09
12/26/2018
122612018
0.10
PROM
DRILL
DLOG
T
Tie into the RA tag for a -0.75'
9,963.0
9,975.7
10:09
10:15
correction.
12/26/2018
12/2612018
0.20
PROD1
DRILL
TRIP
T
Continue to RIH, Dry drift billet - clean.
9,975.7
10,437.0
10:15
10:27
12/26/2018
122612018
1.40
PROD1
DRILL
DRLG
T
CT 5218 psi @ 1.88 bpm in, 1.88 out,
10,437.0
10,647.0
10:27
11:51
Delta P 1111 psi, BHP 4162 psi - 11.8
EMW @ the window. OBD, CT Wt 13
k lbs, WOB 2.4 k lbs, ROP -200 ft/hr
Average ROP over interval 150 R/hr
12/26/2018
12/26/2018
0.20
PROD1
DRILL
WPRT
T
PU, BHA wiper -200'
10,647.0
10,647.0
11:51
12:03
RBIH
12/262018
12/26/2018
0.80
PRODt
DRILL
DRLG
T
CT 5189 psi @ 1.86 bpm in 1.85 bpm
10,647.0
10,795.0
12:03
12:51
out, Delta P 1089 psi, BHP 4155 psi.
OBD, CT Wt 13.6 k lbs, WOB 2 k lbs,
ROP 200 ft/hr
Average ROP over interval 193 R/hr
12/26/2018
12/26/2018
0.40
PROM
DRILL
DRLG
T
CT 5189 psi @ 1.86 bpm in 1.85 bpm
10,795.0
10,879.0
12:51
13:15
out, Delta P 1089 psi, BHP 4155 psi.
OBD, CT Wt 13.6 k lbs, WOB 2 k lbs,
ROP 200 R/hr
Average ROP over interval 193 ft/hr
12/26/2018
12/26/2018
0.20
PROD?
DRILL
WPRT
T
PU Wt 38 k lbs. BHA wiper - 280'
10,879.0
10,879.0
13:15
13:27
RBIH
12/26/2018
12/26/2018
1.00
PROW
DRILL
DRLG
T
CT 5189 psi @ 1.86 bpm in 1.85 bpm
10,879.0
11,000.0
13:27
14:27
out, Delta P 1089 psi, BHP 4155 psi.
OBD, CT Wt 13.6 k lbs, WOB 2 k lbs,
ROP 200 ft/hr
Average ROP over interval 121 ft/hr
12/26/2018
12/26/2018
0.40
PROD1
DRILL
WPRT
T
PU Wt 39 k lbs. Wiper #1 - Billet clean
11,000.0
10,FO-5 0
14:27
14:51
12/26/2018
12/26/2018
0.40
PROD1
DRILL
WPRT
T
RBIH, -Billet clean.
10,005.0
11,000.0
14:51
15:15
12/26/2018
12/262018
1.70
PROD1
DRILL
DRLG
T
CT 5335 psi @ 1.86 bpm in 1.85 bpm
11,000.0
11,231.0
15:15
16:57
out, Delta P 1089 psi, BHP 4229 psi.
OBD, CT Wt 10 k lbs, WOB 1.8 k Ibs,
ROP 150 R/hr
Average ROP over interval 136 R/hr
12/26/2018
12/26/2018
0.20
PROD1
DRILL
WPRT
P
PU Wt 39 k lbs. BHA wiper- 132'
11,231.0
11,231.0
16:57
17:09
RBIH
12/26/2018
12/26/2018
1.50
PROD1
DRILL
DRLG
P
CT 5356 psi @ 1.81 bpm in 1.80 bpm
11,231.0
11,465.0
17:09
18:39
out, Delta P 1120 psi, BHP 4197 psi.
OBD, CT Wt 13 k lbs, WOB 1.58 k lbs,
ROP 70 ft/hr
Average ROP over interval XXXX R/hr
12/26/2018
12/26/2018
0.40
PROD1
DRILL
WPRT
P
1,000', Wiper up hole with sweeps,
11,465.0
10,465.0
18:39
19:03
PUW 41 k
Page 9/17 Report Printed: 1121/2019
Operations Summary (with Timelog Depths)
3C-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Stan Time
End Toms
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
12/26/2018
12/26/2018
0.33
PROD1
DRILL
WPRT
P
Wiper back in hole, RIW 12 k
10,465.0
11,465.0
19:03
19:22
12/26/2018
12/26/2018
0.88
PROD1
DRILL
DRLG
P
BOBD, 1.8 bpm at 5,283 psi, Diff--907
11,465.0
11,609.0
19:22
20:15
psi, WHP=136, BHP=4,202, IA=824,
OA=307
12/26/2018
12/26/2018
2.40
PROD1
DRILL
DRLG
P
Stall motor 6 @ 11,609', 11,607',
11,609.0
11,609.0
20:15
22:39
11,606', 11,605', 11,605' and 11,606',
PUW 41-58 k,
12/26/2018
12126/2018
1.00
PROD?
DRILL
WPRT
P
Wiper to the window w/5x5 sweep,
11,609.0
9,955.0
22:39
23:39
PUW 43
12/26/2018
12126/2018
0.15
PROD?
DRILL
DLOG
P
Log the RA marker correction of plus
9,955.0
9,976.0
23:39
23:48
5.0'
12/26/2018
12/27/2018
0.19
PROD1
DRILL
WPRT
P
Continue wiper back in hole, RIW 13 k
9,976.0
11,427.0
23:48
00:00
•`• Note: seen drag from 11,230'-
11,240' with 1.7 k DHWOB
12/27/2018
12/27/2018
0.20
PROD1
DRILL
WPRT
P
Continue wiper back in hole, RIW 13 k
11,427.0
11,608.0
00:00
00:12
12/27/2018
12/27/2018
1.00
PROD1
DRILL
DRLG
P
BOBD, 1.8 bpm at 5,073 psi,
11,608.0
11,608.0
00:12
01:12
Diff--1,055, WHP=151, BHP=4,211,
IA=820, OA=301, unable to drill ahead
"• Note: New Mud at the bit @
11,609'
12/27/2018
12/2712018
0.75
PRODi
DRILL
WPRT
T
POOH
11,608.0
9,916.0
01:12
01:57
12/27/2018
12127/2018
1.90
PROD1
DRILL
TRIP
T
Open EDC, failed position error,
9,916.0
79.1
01:57
03:51
1
1
1reboot system, Open EDC, PJSM
12/2712018
12/27/2018
1.50
PROD1
DRILL
PULD
T
PUD, drilling BHA#8
79.1
0.0
03:51
05:21
•" Note: Inspect Coiled Tubing @ 12'
up from CTC 0.206 avg, 5' up from
CTC 0.148 inch
12/27/2018
12/27/2018
1.50
PRODt
DRILL
PULD
T
PD BHA #9, inspect packoffs - good,
0.0
79.1
05:21
06:51
12/27/2018
12/27/2018
1.60
PROD1
DRILL
TRIP
T
RIH, close EDC, Test agitator 1123 psi
79.1
9,380.0
06:51
08:27
@ 1.88 bpm, LD BHA#8 coilTrak.
12/27/2018
12/27/2018
0.20
PROD?
DRILL
DLOG
T
Tie into to Kt for a -4' correction.
9,380.0
9,398.1
08:27
08:39
12/27/2018
12/27/2018
0.50
PROD?
DRILL
TRIP
T
Continue to RIH, 1 k WOB blip @
9,398.1
11,300.0
08:39
09:09
9940', window and billet clean.
11,197' S/D 8 k Ibs WOB, Pu CT W 39
k lbs, attempt to RBIH,
11,186' S/D 3 k Ibs, PU 37 k lbs,
RBIH, modulate pump, min rate to get
going,
RIH to 13,300', top of A3 silt,
12/27/2018
12/27/2018
0.60
PROD1
DRILL
WPRT
T
PU back through touble zone to
11,300.0
11,400.0
09:09
09:45
11,100, zero for bottoms up, dragging
up to -1.7 k WOB, some motor work.
RBIH 1.2 bpm, clean.
12/27/2018
12/27/2018
0.20
PRODi
DRILL
TRIP
T
RIH
11,400.0
11,608.0
09:45
09:57
Ct RIH Wt 14 k lbs
12/27/2018
12/27/2018
0.20
PROD1
DRILL
DRLG
T
CT 5022 psi @ 1.88 bpm in, 1.88 bpm
11,608.0
11,612.0
09:57
10:09
out, Delt P 1070 psi, BHP 4164 psi
OBD, CT Wt 1O up to 4 k WOB,
driled ahead, ratty.
12/27/2018
12/27/2018
0.40
PROW
DRILL
WPRT
T
PU Wt 50 k lbs, dragging-7 WOB, tell
11,612.0
11,610.0
10:09
10:33
1
1
off to -3 k, Tum around @ 1110, still
showing -3 K WOB, zero WOB RBIH
Page 10/17 Report Printe 1: 112112019
Operations Summary (with Timelog Depths)
3C-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Aa ity Code
Time P -T -X
Operation
(tIKB)
End De" (MKS)
12/27/2018
12/27/2018
3.20
PRODi
DRILL
DRLG
T
CT 5161 psi @ 1.91 bpm in, 1.91 bpm
11,610.0
11,608.0
10:33
13:45
out, Delt P 1119 psi, BHP 4248 psi
OBD, CT Wt 1 O up to 4 k WOB,
driled ahead, ratty.
11610, PU dragging -3 WOB, RBIH,
tagup 10609'
RBIH, find bottom @ 10608', 11 stalls,
lube up pill pits, send 5x5, no
noticable change, roll tool face from
60 to 180, continue to stall @ or very
near 11608' Hole is clean, very low
amount of solids being returned.
12/27/2018
12/27/2018
1.30
PROD1
DRILL
DRLG
T
Restat after a stall, dril ahead from
11,608.0
11,614.0
13:45
15:03
11608.6 to 11613.4' PU
Restart and drill slowly to 11614',
Atempt to pick up for a restart, Bump
against CT Wt trips at 65 k lbs, -14 k
WOB, work pipe up to 70 k Ibs, -17.9
kWOB, pop free on 4th cycle.
12/27/2018
12/27/2018
1.20
PROD1
DRILL
WPRT
T
PUH on wiper trip, drug negative WOB
11,614.0
9,953.0
15:03
16:15
from 11218 - 1181'.
12/27/2018
12/27/2018
0.20
PROD1
DRILL
DLOG
T
Tie into the RA tag +4.5' correction
9,953.0
9,976.7
16:15
16:27
12/27/2018
12/27/2018
1.70
PROD1
DRILL
TRIP
T
Open EDC, POOH for a new bit.
9,976.7
72.0
16:27
18:09
12/27/2018
12/27/2018
1.00
PROD1
DRILL
PULD
T
PUD, Drilling BHA#9, bit grade 3-2
72.0
0.0
18:09
19:09
balled up
12/27/2018
12/2712018
0.85
PROD1
DRILL
PULD
T
PD, Drilling BHA#10
0.0
9,380.0
19:09
20:00
12/27/2018
12/27/2018
1.80
PROD1
DRILL
DLOG
T
Log the K1 marker correction of minus
9,380.0
9,401.0
20:00
21:48
8.0'
12/27/2018
12/27/2018
0.60
PROD1
DRILL
TRIP
T
Continued RIH
9,401.0
11,229.0
21:48
22:24
12/27/2018
12/28/2018
1.60
PROD1
DRILL
TRIP
T
Work down, setting down @ 11,250,
11,229.0
11,277.0
22:24
00:00
11,265',11,225', 11190',11196',
11,259', and 11,277', PUH circulating
BU w/sweep
12/28/2018
12/28/2018
0.80
PROM
DRILL
TRIP
T
Wiper back in hole, work pipe down
11,277.0
11,604.0
00:00
00:48
11,197' seen 2.2 k weight bobble,
continue IH
12/28/2018
12/28/2018
0.30
PROM
DRILL
TRIP
T
Set down weight fell off, continue IH
11,604.0
11,606.0
00:48
01:06
set down 11,606', PUH PUW 49 k
12/28/2018
12/28/2018
1.00
PROM
DRILL
TRIP
T
Continue to work towards bottom, 1.87
11,606.0
11,608.8
01:06
02:06
bpm at 5,388 psi, IA=814, OA=262
11,604'49k minus 3.8k DHWOB
11,606.9'50k, minus 3.3k DHWOB
11,609.5'41k, minus 2.6k DHWOB
11,608.8'60k, minus 10.0k DHWOB
12/28/2018
12/28/2018
1.50
PROD1
DRILL
TRIP
T
Continue working towards bottom,
11,608.8
11,608.8
02:06
03:36
1.87 bpm at 5,410 psi, IA=814,
OA=262
11604.1' minus 1.3k DHWOB
11603.8' minus 4.Ok DHWOB
11,609.1' minus 5.5k DHWOB
11,603' minus 4.5k DHWOB
12/28/2018
12/28/2018
0.20
PROD1
DRILL
TRIP
T
Pull wiper up hole to 11,388'
11,608.8
11,388.0
03:36
03:48
I
12/28/2018
12/28/2018
0.20
PROM
DRILL
TRIP
T
Wiper back in hole, observe WOB @
11,388.0
11,603.0
03:48
04:00
11,603', start time drilling
Page 11117 Report Printed: 112112019
Operations Summary (with Timelog Depths)
3C-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Steri Depth
SUM Time
Ed Mme
our (W)
Phase
Op Cafe
Activity Cade
Time P -T-%
Operation
(ftKe)
End Depth (INKS)
12/28/2018
12/2812018
1.20
PROD1
DRILL
DRLG
T
Observe WOB @ 11,603', start time
11,603.0
11,605.0
04:00
05:12
drilling 1.87 bpm at 5,381 psi,
Diff=1,218 psi, WHP=182,
BHP=4,251, IA=816, OA=268
12/28/2018
12/28/2018
2.20
FROM
DRILL
TRIP
T
PUH on a wiper, PU 48 k lbs -
11,605.0
9,370.0
05:12
07:24
dragging A k WOB.
Pulled -90 lbs WOB thrugh A3 LS -
11,172', some motor work.
12/28/2018
12/2812018
0.20
PROD?
DRILL
DLOG
T
Tie into Kt for a +6' correction
9,370.0
9,408.0
07:24
07:36
12/28/2018
12/28/2018
0.20
PROD1
DRILL
CIRC
T
Circulate bottoms up chasing sweeps
9,408.0
9,918.0
0736
07:48
to surface, no sign of gravel
12/28/2018
12/28/2018
0.30
PRODt
DRILL
TRIP
T
RIH to 11,150 above A&S, time out
9,918.0
11,150.0
07:48
08:06
sweeps,
12/28/2018
12/28/2018
2.50
FROM
DRILL
TRIP
T
Chase sweeps out of hole on swab
11,150.0
73.4
08:06
10:36
wiper trip. Pre load OS PDL.
Sweeps didnt return much in the line
of solids, a few rocks and mostly metal
from 824' bit depth, Jog the hole, little
returns.
12/28/2018
12128/2018
1.00
FROM
DRILL
PULD
T
Bump up, PD BHA#10. Lay down
73.4
0.0
10:36
11:36
bottom half, need to swap HOT.
12/28/2018
12/28/2018
0.50
PROD1
DRILL
BOPE
P
Function test BOPE - Good test
0.0
0.0
11:36
12:06
1.2128/2018
12128/2018
1.60
PROW
STK
PULD
T
PU & PD BHA#11, Anchored billet,
0.0
73.0
12:06
13:42
inspect pack offs, - good, Bump up,
set counters.
12/28/2018
12128/2018
1.60
FROM
STK
TRIP
T
RIH
73.0
9,380.0
13:42
15:16
12/28/2018
12128/2018
0.20
FROM
STK
DLOG
T
Tie into the K1 for -2' correction
9,360.0
9,404.8
15:18
15:30
12/28/2018
12128/2018
1.20
FROM
STK
WPST
T
PU WT 39 k lbs, Close EDC, RIH to
9,404.8
10,522.0
15:30
16:42
setting depth, PU to neutral weight.
Slips oriented 180'ROHS, zero
weight, pump @ 0.25 bpm, sheared at
4400 psi,see 0.72 WOB, attempt to
SID weight, billet pushed down hole
WOB0.9-0.8.
Consult w town.
12/28/2018
12/28/2018
1.90
FROM
STK
TRIP
T
PU Wt 40 k Is, PUH into casing, open
10,522.0
72.0
16:42
18:36
EDC. POOH
12/28/2018
12/28/2018
1.10
FROM
STK
PULD
T
PUD, Billet setting tools, BHA#11
72.0
0.0
16:36
19:42
••• Note: Inspect Coiled Tubing above
CTC w/UT tester 0.148" inch
12/28/2018
12/28/2018
1.30
FROM
STK
PULD
T
PD, OH Anchored billet #2
0.0
73.6
19:42
21:00
12128/2018
12/28/2018
1.67
FROM
STK
TRIP
T
RIH
73.6
9,375.0
21:00
22:40
12/2812018
12/28/2018
0.15
PROD1
STK
DLOG
T
Log the K1 marker cottection of minus
9,375.0
9,405.0
22:40
22:49
4.0'
12/2812018
12128/2018
0.10
PROD1
STK
TRIP
T
Continue IH closer to TOW, function
9,405.0
9,900.0
22:49
22:55
closed EDC, PUW 38 k
12/28/2018
12/28/2018
0.33
FROM
STK
TRIP
T
Continue RIH to setting depth
9,900.0
10,501.8
22:55
23:15
12/28/2018
12/28/2018
0.10
PROD1
STK
WPST
T
PUH 32 k (10,500.8'), bring pump
10,501.8
10,490.0
23:15
23:21
online, 0.5 bpm 1,040 psi to shear @
4,750 psi, Set down 4.3 k (10,503.5'),
PUW 38 k
12/28/2018 11212912018
0.65
FROM
STK
TRIP
T
POOH
10,490.0
6,517.0
23:21
00:00
12129/2018
12/29/2018
1.00
FROM
STK
TRIP
T
Continue POOH
6,517.0
73.6
00:00
01:00
Page 12117
ReportPrinted: 112112019
Operations Summary (with Timelog Depths)
3C -O8
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
stat Depth
stat Time
End Torre
our (hr)
Phase
Op Code
Acbvdy Code
Time P -T -X
Operation
(MB)
End Depth(HKB)
12/29/2018
12/29/2018
0.75
PROD1
STK
PULD
T
At surface, spaceout, PUD & LD
73.6
0.0
01:00
01:45
setting tools BHA#12
12/29/2018
12/29/2018
1.00
PROD1
STK
PULD
T
PD, kickoff/drilling BHA#13, surface
0.0
78.3
01:45
02:45
test BHI CoilTrak tools (good -test)
12/29/2018
12/29/2018
1.66
PROD1
STK
TRIP
T
Tag up reset counters, RIH
78.3
9,380.0
02:45
04:24
Note: Surface test Agitator (0212-
0040) @ 586' (Level 4 vibs)
12/29/2018
12/29/2018
0.10
PROD1
STK
DLOG
T
Log the K1 correction of minis 4.0',
9,380.0
9,399.7
04:24
04:30
PUW 38
12/292018
12/29/2018
0.33
PROD1
STK
TRIP
T
Continue IH, dry lag TOB @ 10,490.3'
9,399.7
10,490.0
0430
04:50
12/29/2018
12/29/2018
0.16
PROW
STK
TRIP
T
PUH, obtain pump parameters, 1.87
10,490.0
10,490.0
04:50
05:00
bpm at 5,684 psi, Diff --1,343 psi,
WHP=116, BHP=4,123, IA=795,
OA=227
12/29/2018
12/29/2018
1.60
PROD!
STK
KOST
T
Time mill off billet @ 10,490'
10,490.0
10,493.0
05:00
06:36
1 fl/hr for a foot MOB -0.7 k lbs - 5:45
2ft/hr for foot - WOB -0.5 k lbs - 6:17
3ft/hr for a foot - WOB 0.1 k lbs,
12/29/2018
1229/2018
0.50
PROD1
STK
KOST
T
Up ROP to 15 ft/hr, Drilling, WOB 0.28
10,493.0
10,502.0
06:36
07:06
k lbs, CT Wt 12.7 k lbs
@10,495'- increase ROP to 25 ft/hr -
12/29/2018
1229/2018
0.90
PROD1
DRILL
DRLG
T
Drill ahead, CT Wt 14 k lbs, OB Ct
10,502.0
10,640.0
07:06
08:00
5840 psi @ 1.87 bpm in 1.83 out, BHP
4174 psi, 11.8 ppg EMW @ the
window, WOB 2 k lbs, ROP 100-200
ft/hr. Pump 5x5 sweep.
Average ROP 153 ft/hr
12/292018
12/29/2018
0.20
PROM
DRILL
WPRT
T
PU 45 k lbs, PUH and dry drift billet,
10,640.0
10,640.0
08:00
08:12
1
1
clean, short wiper 176' RBIH
12/292018
12/29/2018
1.80
PROM
DRILL
DRLG
T
CT 5407 psi, 1.86 bpm in, 1.86 bpm
10,640.0
10,900.0
08:12
10:00
out, Delta P 1240 psi, BHP 4141 psi,
11.8 ppg EMW @ the window, CT Wt
161 lbs, WOB 1-3 k lbs. ROP 50-150
ft/hr
10728, PU W145 k lbs
10839'PU W140 k lbs
Average ROP 144 ft/hr
12/29/2018
12/292018
0.10
PROM
DRILL
WPRT
T
PU 45 k lbs, BHA, w 5x5 sweep, 140'
10,900.0
10,900.0
10:00
10:06
1
RBIH
12/29/2018
12/292018
0.90
PROM
DRILL
DRLG
T
CT 5523 psi, 1.86 bpm in, 1.86 bpm
10,900.0
11,030.0
10:06
11:00
out, Delta P 1290 psi, BHP 4194 psi,
11.8 ppg EMW @ the window, CT Wt
16.51 lbs, WOB 1-3 k lbs
Average ROP 144 ft/hr
12/29/2018
12/29/2018
0.40
PROM
DRILL
WPRT
T
PU 40 k lbs, Wiper #1, to EOB - 960'
11,030.0
9,960.0
11:00
11:24
w 5x5 sweep,
CT Wt 36 k lbs @ billet #2 dean, billet
#1 -clean
Geo discussion turned wiper #1 into a
tie in to be most efficient with time.
12/29/2018
12/29/2018
0.20
PROD1
DRILL
DLOG
T
Tie into RA tag for+1' correction
9,960.0
9,985.0
11:24
11:36
1
I
12/29/2018
12/29/20180.30
PRODi
DRILL
TRIP
T
RBIH,
9,985.0
11,030.0
11:36
11:54
- 0.35 bbls of cutting returned on the
trip, CR climbed from 0.81 to 0.9 Still
- 0.49 bbl cuttings in the hole
Page 13117 Report Printed: 1121/2019
Operations Summary (with Timelog Depths)
3C -O8
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Our (hr)
Phase
Op Code
Activity Code
Time P -T-%
Openvscm
(ftKB)
End Depm(ftKB)
12/29/2018
12/29/2018
1.20
PRODt
DRILL
DRLG
T
Spud twice, PU for restarts
11,030.0
11,156.0
11:54
13:06
CT 5631 psi @ 1.88 bpm in, 1.88 bpm
out, Delta P 1268 psi, BHP 4244 psi,
11.8 ppg EMW @ the window, CT 12 k
lbs, WOB 2.5 k lbs
91 ' Near bit, ROP drop @ 11,117',
95.74° Near bit, estimate 97 ° @ the
bit
Appeared to pop out of the lower
lense @ 11126' bt depth, actual bit inc
was 97" as we entered the A3 LS
Drill ahead, 60 -80 ROP - 3 k WOB,
CT 9 k lbs.
12/29/2018
12/29/2018
0.40
PROD1
DRILL
DRLG
T
Roll tool face from HS to LS, near bit
11,156.0
11,192.0
13:06
13:30
inc, 99 ° near bit depth 11137'.
Targeting 2-3 k WOB, CT Wt 10 k lbs,
12/29/2018
12/29/2018
1.40
PRODi
DRILL
DRLG
T
PU, reduce pump rale to 1.5 bpm,
11,192.0
11,355.0
13:30
14:54
RBIH
Near bit inc fell off to - 97.5° and is
holding, ROP up and down following
Gamma.
Drilled into something hard, inc fell, all
good.
12/29/2018
12/29/2018
0.10
PROD1
DRILL
WPRT
T
PU38 k lbs, Wiper to above hot
11,355.0
11,081.0
14:54
15:00
gamma. - clean
12/29/2018
12/29/2018
0.10
PRODt
DRILL
WPRT
T
RBIH, -clean
11,081.0
11,355.0
15:00
15:06
12/29/2018
12/29/2018
1.60
PRODi
DRILL
DRLG
T
CT 5570 psi, @ 1.85 bpm in 1.85 bpm
11,355.0
11,454.0
15:06
16:42
out, Delta P 1253 psi, BHP 4235 psi,
11.8 ppg EMW @ the window, CT Wt
9.9 k Ibs, 3.8 k WOB,
11443', PU Wt 41 k lbs,
11448' PU Wt 41 k IbsHard stuff
11,442 caught a sampe, Geo says
Ankerhe
12/29/2018
12129/2018
0.40
PROD?
DRILL
DRLG
T
Broke out, Drilled ahead, CT 5897'@
11,355.0
11,505.0
16:42
17:06
1.85 bpm, BHP 4257 psi, WH 216 psi,
11.8 ppg EMW @ the window. IA 816
psi, OA276 psi
12/29/2018
12/29/2018
0.40
PROD1
DRILL
WPRT
T
PU 40 k lbs, wiper #1.
11,505.0
10,505.0
17:06
17:30
12/29/2018
12/29/2018
0.35
PROD1
DRILL
WPRT
T
RBIH
10,505.0
11,505.0
17:30
17:51
12/29/2018
12/29/2018
0.88
PROD1
DRILL
DRLG
T
BOBD, 1.86 bpm @ 5,104 psi, Diff--
11,505.0
11,615.0
17:51
18:43
945 psi, WHP=152, BHP=4,277,
IA=821, OA=284, avg/ROP 92 fph
@ 11,602'spiked up DHWOB 2.1 - 3.2
k
12/29/2018
12/29/2018
1.35
PROD1
DRILL
DRLG
P
BOBD, 1.86 bpm @ 5,104 psi, Diff=
11,615.0
11,725.0
18:43
20:04
945 psi, WHP=152, BHP=4,277,
IA=821, OA=284
12/29/2018
12/29/2018
0.10
PRODt
DRILL
WPRT
P
Stall Motor, PUW 44 k
11,725.0
11,687.0
20:04
20:10
12/29/2018
12/29/2018
0.15
PROD1
DRILL
WPRT
P
RIBH,
11,687.0
11,725.0
20:10
20:19
12/29/2018
12/29/2018
1.80
PROD1
DRILL
DRLG
P
BOBD, 1.87 bpm @ 5,690 psi,
11,725.0
11,905.0
20:19
22:07
Diff -1,101, WHP=140, BHP=4,313,
IA=820, OA=284,
12/29/2018
12/29/2018
0.30
PROD1
DRILL
WPRT
P
Wiper up hole, PUW 38
11,905.0
11,199.0
22:07
22:25
12/29/2018
12/29/2018
0.30
PROD1
DRILL
WPRT
P
Wiper back in hole, RIW 11 k
11,199.0
11,905.0
22:25
22:43
I
I
Page 14117 Report Printed: 112112019
Operations Summary (with Timelog Depths)
X -O8
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Stan Time
End Time
Dur (hr)
Phase
Op Code
Amwy Code
Time P -T -X
Operation
(hKB)
End Depth (flKB)
12/29/2018
12/30/2018
1.27
PRODt
DRILL
DRLG
P
BOBD, 1.87 bpm @ 5,540 psi,
11,905.0
12,078.0
22:43
00:00
Diff --1,354 psi, WHP=146,
BHP=4,290, IA=833, OA=297,
12130/2018
12/30/2018
1.75
PROD1
DRILL
DRLG
P
OBD, 1.86 bpm @ 6,148 psi,
12,078.0
12,197.0
00:00
01:45
Diff=1,342 psi, WHP=96, BHP=4,307,
IA=836, OA=304
12/30/2018
12/30/2018
0.75
PROD1
DRILL
WPRT
P
Wiper up hole to the window
12,197.0
9,955.0
01:45
02:30
1
w/sweeps, PUW 46 k
12/30/2018
12/30/2018
0.15
PROD?
DRILL
DLOG
P
Log the RA marker correction of plus
9,955.0
9,973.0
02:30
02:39
5.0'
12/30/2018
12/30/2018
1.00
PROD1
DRILL
WPRT
P
Wiper back in hole, RIW 15 k
9,973.0
12,197.0
0239
03:39
12/30/2018
12/30/2018
1.10
PROD1
DRILL
DRLG
P
BOBD, Drill ahead, CT Wt -2 k lbs,
12,197.0
12,246.0
03:39
04:45
W08 2.7 k lbs, ROP 58 ft/hr.
Drill into — 150 API gamma. Consult w
town.
12/30/2018
12/3012018
3.70
PROD?
DRILL
WPRT
P
PU, stage TD sweeps to the bit,
12,246.0
78.3
04:45
08:27
POOH on swab wiper.
Uncorrected TD - 12,246'
Jog open hole @ 11,250', -1200 lb
WOB tug @ 10,937', no spike in motor
work.
400 lbs WOB spike @ 10,488', 2nd
billet, 1st billet clean, time out sweeps
to EOB, jog open hole,
Window clean, chase additional
sweep in the tubing.
12/30/2018
12/30/2018
1.80
PROD1
DRILL
TRIP
P
RBIH
78.3
9,385.0
08:27
10:15
12/3012018
12/30/2018
0.20
PROD1
DRILL
DLOG
P
Tie into the Ki for a 45' correction.
9,385.0
9,399.8
10:15
1027
12/30/2018
12/30/2018
0.20
PROM
DRILL
TRIP
P
Continue in hole, Park at 9923.80 MD
9,399.8
9,399.8
10:27
1039
and 6604.01 'TVD
Trap 4155 psi / 12.1 ppg EMW and
monitor BHP
Elapsed time min. BHP
EMW
1 4149 12.08
2 4129 12.02
5 4086 11.89
9 4046 11.76
12/30/2016
12/30/2018
1.00
PROD1
DRILL
TRIP
P
Ct PU Wt 36 k lbs.
9,399.8
12,227.0
10:39
11:39
Continue to RIH, window and both
bilets clean.
Pack off event with no WOB @ 11282,
PU dean and continue to RIH
Two more minor increases in BHP @
11,438 and 11,718', suspect pack off
events near 11117' funel point.
Continue in hole, SID 12199, PU,
reduce rate to 0.9 bpm , RBIH stack
out @ 12,185', PU, 43 k lbs, RBIH,
SID 12,227' PU 52 k lbs, -5 k lbs
WOB.
12/30/2018
12130/2018
1.50
PROD1
DRILL
CIRC
P
Jog and circulate @ 1.5 bpm while
12,227.0
12,216.0
11:39
13:09
building liner running pill and pump to
the bit.
Page 15117 Report Printed: 112112019
Operations Summary (with Timelog Depths)
3C-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Tana
Our that
Phase
Op Corte
A6WyCode
Time P -T -X
Operation
(RKB)
End Depth(fiKB)
12/30/2018
12/30/2018
2.40
FROM
DRILL
DISP
P
PU 42 k lbs, POOH laying in 51 bbl
12,216.0
100.0
13:09
15:33
liner running pill.
Painting flags, TD yellow 9858.26' and
Window, white @ 7478.26'
Top of liner running pill 8700'
Continue out of hole laying in kill
weight.
12/30/2018
12/30/2018
1.50
FROM
DRILL
PULD
P
Bump up, Flow check, LD over a dead
100.0
0.0
15:33
17:03
1
1well.
12/30/2018
12/30/2018
1.50
COMPZI
CASING
PUTB
P
Prep the floor for running liner. PJSM.
0.0
0.0
17:03
18:33
Verify tubing tally with crew and NS
rep
12/30/2018
12/30/2018
4.20
COMPZ1
CASING
PUTB
P
Pick up liner
0.0
2,416.0
18:33
22:45
12/30/2018
12/30/2018
0.75
COMPZ1
CASING
RUNL
P
PU/MU, Seal Bore Assembly, GS
2,416.0
2,460.1
22:45
23:30
(NS), and CoilTrak tools
12/30/2018
12/31/2018
0.50
COMPZI
CASING
RUNL
P
RIH, with Liner assembly BHA#14,
2,460.1
5,148.0
23:30
00:00
hanging weight 5.4 k
12/31/2018
12/31/2018
0.84
COMPZI
CASING
RUNL
P
Continue RIH with bac sleeve liner
5,148.0
9,866.0
00:00
00:50
completion BHA#14
12/31/2018
12/31/2018
0.20
COMPZI
CASING
RUNL
P
Correct to the EOP flag minus 6.11',
9,866.0
9,866.0
00:50
01:02
PUW 40 k, minus 11.9 DHWOB
12/312018
12/31/2018
0.50
COMPZI
CASING
RUNL
P
Continue IH
9,866.0
11,765.0
01:02
01:32
12/31/2018
12/31/2018
0.15
COMPZ1
CASING
RUNL
P
Log the K1 marker minus 0.5', no
11,765.0
12,247.0
01:32
01:41
correction
12/312018
12/31/2018
0.23
COMPZI
CASING
RUNL
P
Liner on bottom, Bring pump on line
12,247.0
9,830.6
01:41
01:55
1.7 bpm at 5,255 psi, Diff=1,749 psi,
PUW
12/31/2018
12/31/2018
0.26
COMPZI
CASING
RUNL
P
Remove liner length from BHA, line up
9,830.6
9,816.0
01:55
02:10
to SW, Open EDC,
*** Note: Check Wellhead bolts, (no
torque needed)
Perform Static Pressure Survey:
Park at 9,816' CTMD and sensor
depth 6,556.25' TVD
Trap 4,130 psi / 12.1 ppg EMW and
monitor BHP
Elapsed time 5 min. BHP
EMW
5 4107 12.2
10 4100 12.05
15 4098 12.02
12/312018
12/31/2018
1.00
COMPZI
CASING
DISP
P
Line up and pump SW down coil
9,816.0
9,816.0
02:10
03:10
12/312018
12/31/2018
1.40
COMPZ1
CASING
DISP
P
POOH, while displacing well to SW,
9,816.0
2,927.6-
03:10
04:34
LRS on location 02:55 am
12/31/2018
12/31/2018
0.90
COMPZI
CASING
DISP
P
Circulate in 30 bbls diesel freeze
2,927.0
70.0
04:34
05:28
protect, diesel from 2927' to surface.
12/31/2018
12/31/2018
1.50
COMPZI
CASING
PULD
P
Bump up, space out, PUD BHA#14.
70.0
0.0
05:28
06:58
'"Left 1,200 psi below the master
12/312018
12/31/2018
2.00
DEMOB
WHDBOP
CIRC
P
Jet stack, Flush lines, blow down,
0.0
0.0
06:58
08:58
12/31/2018
12/31/2018
2.80
DEMOB
WHDBOP
CTOP
P
Cut pipe, rehead, while Bore O
0.0
0.0
08:58
11:46
scoping. Unhappy with initial CC after
re -head. Cut pipe and re re -head.
Pull test to 35 k lbs - good
Bore O Scope found tear in upper 2-
3/8" seal will replace prior to move.
12/31/2018
12/31/2018
0.70
DEMOB
WHDBOP
CTOP
P
DD/MWD rehead and test wire, 400 m
0.0
0.0
11:46
12:28
ohms and 66 ohms.
Page 16/17 Report Printed: 1/21/2019
Operations Summary (with Timelog Depths)
fir
3C-08
Rig:
NABORS CDR3-AC
Job: DRILLING SIDETRACK
Time Log
Stan Depth
Stan Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
0.0
End Depth(RKB)
0.0
12/31/2018
12/31/2018
0.68
DEMOB
WHDBOP
RURD
P
Replce dammaged upper 2-3/8" ram
1228
12/31/2018
13:09
12/31/2018
1.40
DEMOB
WHDBOP
RURD
P
Work RD check list,
0.0
0.0
13:09
14:33
—UN
0.0
0.0
12/31/2018
12/31/2018
1.44
DEMOB
WHDBOP
P
ND BOP
14:33
16:00
"Rig Released: 12/31/16 @ 16:00 hrs
Page 17117
Report Printed: 1/2112019
Lin OS •
Ln L'-
r- _ N N _cc
m ,, F-
1.0 7 CPI cn
0
00 z CSE CNI a,• o L
a, _ 3 0 � h
V Y 47, a
o c N U °; E > ,
.:C3-
a` o a O
41 r-6 CC ayj Q
• xt 0 t u >' c co Q
❑ -I W CO co co co co co co CO CO CO CO CO CO 00 00 }' Q, E O0 6 CO
Q r r r r N ,-
CC
J
Q O a c�a w R ro w m '- � a O N
, h A A t0 h 8 O O N M M 4 Ln 8 0 C
T O C
0 N r r r r r r
N Z Q r U• -1:5N O +-+
Q ❑ N E U
z a, , -0 Q,
ce
g 1- L• O C i
❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ C - Q, N L
W J J J J J J J J J J J J J J J � C 'F O
a -
> W W W W W W W W W W W W W W W N L U 4
F LL LL LL LL LL a LL LL LL LL LL LL LL LL LL y Q, a, al
Q J J J J J J J J J J J J J J J D' S > +�-,
2- Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q (1) 0 C 4- 4-
2 Z Z Z Z Z Z Z Z Z Z Z Z Z Z UtC3 0) N 0 L
LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL K ,-. >
C
4-+• C L O J O
C E U N LCL
_ oN gO c _O ,- r>o
E F- Q, Y u .L C ►►
C E n. T F . > U a ++ .
U O V a) H el" Q Q, D_ Q. OC D, Z
LL LJ-
u c p `t J a J O y a _, a v a 'C c 0 0 ^may
rJ 4 a) ❑ '- ❑ !Y - - N U a) ce re
N �'' a J iC J a 3 T. co 7: J H a 3 a a !'1
v, g m 0 co
a -,, U = 0 m F- a s ,i1
C)
u a) Lr m U
7 C
N
_ O > rr
7.1
--a' it oz � > Y J
O Q
_
YDCRS Q
'' - .0 Qa'O
co —
no Z U
` U z O h 2 w Q -0
a) U . N y' O V F
> Y > C
Z =
() N U � CL J J J J J J J J J J J J J J J tp
t0 M
O _ C a'
G� Q Q Q m Q N ,U ` W
t.")11113....11 W L
Oa
4i _fa
CI a)
/ LYwccixccceLrrtarerewrecer E E
W W W W W W W W W W W W W W W %
L', > > > > > > > > > > > > > > > vi
2 W IY2 CLa reCLCZCLCLCLLY a CC cc ••
Z Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y '
a' R a' a' a' 0 a' a a a' 4-. •
ILL w Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Uu
),, a a a a a a a a a a a a a a a= M0 DDMDDDMDDD o 0
O � Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y o
12519091
N X in = •
W rN M U) N M of U) U) CO h W O
LI Co 0 h h h h 14.- N NNNNNNNNN
C$ 0 0 0 0 0 E E
�.� 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a) CD
w 0 O O O O O O O O O O O O O O
W Y
y- v adddd0000rntnNti� Lnti) c Q,
m m CO Ln Lb o 0 0 0 0 0 0 0 0 0
>*` I- I- I- H H (n (n (n fn fn cn (n V1 (n u) B v,
G w ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ C O I
CON
• O
\ I-
O 0 0 0 0 0 0 0 0 O 0 O 0 00 C
W 0 0 0 0 0 0 O O O O O O O 0 O Op
h C M M N 4 N O O O N N h N N h 'V, E
O) co CO h h U) 0) O) 0 CO N 0 U) It) i_ 0
M . O N h CO O M M t0 40 h a t0 ej ' U
N _ _
N 0 0 0 0 0 0 M M 0 M N N
N "�' N N N N N N N N N N N N N N N L
M M M M 0) 0) M 0) O O) 0) O a) O to ` a) v,
R
O O O ONN ONNNNNNNN 'L
01 r r r r CO 0 r O 0 O O O 0 O O
O O O O O O O O O O O O O O O y.I
•� W C U) U) 4n u) u) u) u) u) u) u) U) u) u) v) in
Q U °• �
aa d C o C
tn - -
Cin
FI-- m ra v _
J > U
'L w Y ,,:.W,a2 E W C C
V L
■ 1 U ar Q r` Q, 3
a 7 2 aj ' Q r Q) a) N - h 9) CO 03 r N a0- h r t0 ar r N
0) Z +L-' m M Z N N N M r 0 c":' 0 r r y' _ E a! H—
ea '� a LA N M i i J r o 2 U U 2 2 2 2 m m E to i_ a
C Q O • W N N N N co co r r °- to -�� Z al ro
OQ.CJ a . C Q. ~r k`----.). L o
Q it a a Q
Image Project Well History File' Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original.file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
9'5-
RESCAN DIGITAL DATA
[] Color items: D Diskettes, No.
[] Grayscale items: [] Other, No/Type
[3 Poor Quality Originals: .~
[] Other: , ,
NOTES:
OVERSIZED (Scannable)
[] Maps:
[] Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
[] Logs of various kinds
[] Other
BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE:
Is~
Project Proofing
BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /S/
Scanning Preparation _c~ x 30 = b_ O + ~ = TOTAL PAGES
Production Scanning
Stage 1 PAGE COUNT FROM SCANNED F,LE'
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION' ~"~YES NO
Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES NO
(SCANNING IS COMPLETE AT ~ POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS
RESCANNEDBY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE:
Is~
General Notes or Comments about this file:
Quality Checked (done)
10/25/02Rev3NOTScanned.wpd
~ f.. ~ ~ . ' ~ . . .
• • ' ~
COI'1 ~ . .
ocoPh~llips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
.
~~~~~~~~
JUL 0 ~ 2009
~las~Ca Qil ~ Gas ~ans. Cflmmissiorg
~archc~ a~~
July 3, 20Q9
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchora.ge, AK 99501
V f ~ ~~
~ ~
~~~ ~ ~
.. ~r~
.,,~ ~} s~~,, ~ r ~ ,~4~
~~;,~, ~~~~: , .~
Dear Mr. Maunder:
Enclosed please find a spreadsheet with a list of wells from the Kuparuk field (KRiJ). Each of
these wells was found to ha.ve a void in the conductor. These voids were filled with cement if
needed and corrosion inhibitor, engineered to prevent water from entering the annular space. As
per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that
the treatments took place and meets the requirements of form 10-404, Report of Sundry
Operations.
The cement was pumped June 16~' & 26~', 2009 and the corrosion inhibitor/sealant was pumped
June 23`d & 30~', 2009. The atta.ched spreadsheet presents the well name, top of cement depth
prior to filling, and volumes used on each conductor.
Please ca11 Perty Klein or MJ Loveland at 907-659-7043, if you have any questions.
Sincerely,
~~f~
MJ Loveland
ConocoPhillips Well Integrity Projects Supervisor
• •
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
Kuparuk Field
Date 7/3/09 3 C PAD
Well Name
API #
PTD #
initial top o
cement
Vol, of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitod
sealant date
ft bbls ft al
3C-01 500292141300 1851870 22' 2.3 28" 6/26/2009 5.9 6/30/2009
3C-02 500292141400 1851880 76' 10.0 22" 6/26/2009 5.1 6/30/2009
3C-03 500292141500 1851890 5' 1.0 21" 6/26/2009 5.1 6l30/2009
3C-04A 500292141601 2020570 4' 1.0 23" 6/26/2009 5.1 6l30/2009
3C-05 500292138900 1851540 24" n/a 24" n/a 4.25 6/23/2009
3C-06 500292109600 1840420 6" n/a 6" Na 7.65 6/23/2009
3C-07 500292139100 1851560 37' 5.00 25" 6/16/2009 5.52 6/23/2009
3C-08 500292139000 185155a 12' 2.00 22" 6/16/2009 3.4 6/23/2009
3C-09 500292135500 1851000 20" n/a 20" n/a 2.55 6/23/2009
3C-10 500292135600 1851010 30' 4.10 24" 6/16/2009 4.25 6/23/2009
3C-12 500292135400 1850990 45' 9.30 26" 6/26/2009 4.3 6/30/2009
3C-13 500292142400 1851980 20" n/a 20" n/a 2.12 6/23/2009
3C-14A 500292142501 2071750 3' Na 3' Na 8.07 6/23/2009
3C-15A 500292142601 2080810 31' 4.40 26" 6/16l2009 2.75 6/23/2009
3C-16 500292142700 1852010 20" n/a 20" n/a 2.12 6/23/2009
3C-17 500292338900 2080590 2'6" n/a 2'6" n/a 8.92 6/23/2009
05/12/09
1
~~
Schlumberger -DCS
2525 Gambell Street, Suite 400 t z,;
Anchora e, AK 99503-2838 ~ ~~ ~~ ~ •' ~ / A'~ ~~'
ATTN: Beth cecradl~6~~+•e•a.. t`' .
Well Job #
f~
~-. ~
~ ~ .~ .
~1 AY ~ ~ 2009
~~85~8 ~!~ C85 ~0~~. ~®g'~p~6B531®[~
Ar~~hor~~~
Log Description
NO. 5228
Company: Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Kuparuk
Date BL Color CD
3A-18 AYS4-00069 PERF/SBHP SURVEY l 04/26/09 1 1
3C-08 B14B-00033 GLS $ = / 04/21/09 1 1
2M-25 B14B-00034 GR/TEMPLOG d~/- 04/22/09 1 1
1 R-19A AYS4-00065 SBHP SURVEY -r t/' `~ 3
~ 04/23/09 1 1
3G-13 AYS4-00067 SBHP SURVEY -
( 04/24/09 1 1
3G-05 AYS4-00066 SBHP SURVEY 04/24/09 1 1
3F-07 8146-00038 SBHP SURVEY - 04/24/09 1 1
3F-08 6148-00037 SBHP SURVEY 04/24/09 1 1
3M-25A B14B-00040 SBHP SURVEY - 3 04/25/09 1 1
3K-08 8146-00039 SBHP SURVEY C/ 04/25/09 1 1
2N-318A AWJt-00026 MEM BHP SURVEY -Q 04/27/09 1 1
2Z-07 8146-00045 SBHP SURVEY L 04/29/09 1 1
2Z-01A 6148-00044 SBHP SURVEY ~-_ ~ (~ 04/29/09 1 1
3K-102 ANHY-00080 GLS 04/30/09 1 1
2W-06 B04C-00036 PRODUCTION PROFILE 05/02/09 1 1
2W-12 B04C-00037 PRODUCTION PROFILE - ~ 05/03/09 1 1
3C-02 B04C-00045 POWERCUTTER W/SBHP SURVEY 05/09/09 1 1
1 J-120 B04C-00043 GLS ~ - ~ Q ® 05/08/09 1 1
31-11 B04C-00044 SMALL TBG PUNCH W/SBHP 05/08/09 1 1
Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you.
~~~
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
January 31, 1996
Mr. David J. Johnston
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject: 3C-08(Permit No. 85-155) Well Completion Report
Dear Mr. Commissioner:
Enclosed is the well completion report for the recent operations on KRU 3C-08.
The original 2-7/8" single packer completion was pulled and the wellbore was
cleaned out. A 3-1/2" single packer completion was re-run.
Sincerely,
W. S. Isaacson
Drilling Engineer
Kuparuk Petroleum Engineering
WSI/skad
STATE OF ALASKA
ALA'~'A OIL AND GAS CONSERVATION COMIV~SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 Status of Well Classification of Service Well
OIL [-~ GAS E~] SUSPENDED E~ ABANDONED [] SERVICE E~]
2 Name of Operator 7 Permit Number
ARCO Alaska, Inc 85-155
3 Address 8 APl Number
P.O. Box 100360, Anchorage, AK 99510-0360 50-029-21390
4 Localion of well at surface 9 Unit or Lease Name
522' FNL, 1013' FEE, Sec. 14, T12N, R9E, UM i ,.fr,~~~ Kuparuk River Unit
I ' ! i: lO Well Number
3C-08
At T o la. Depth "' ~~ 11 Fi eldandPool
1031' FNL, 1110' FEL, Sec. 12, T12N, R9E, UM KUPARUK RIVER
5 Elevalion in feet (Indicate KB, DF, etc.) I 6 Lease Designation and Serial No.
RKB 82'I ADL 25629 ALK 2562
12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp. or Abe. nd. I 15 Water Depth, if offshore 16 No. of Completions
July 13, 1995 July 23, 1985 20-Nov-95 (perfd)I NA feet MSL 2
17 Tolal Deptl'~ (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey'120 Depth where SSSV set I 21 Thickness of permafrost
0234' MD & 6841'TVD 10137'MD & 6775' TVD YES L._J NO X[~JI NA feet MDI = 1380' ss APPROX
22 Type Eleclric or Olher Logs Run
23 CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT GRADE TOP BTM HOLE SIZE ~ RECORD
16" 62.58# H-40 SURF. 116' 24" 213 sx CS II
9.625" 36# J-55 SURF. 5206' 12.25" 1580 sx AS III & 340 sx Class G
7" 26# J-55 SURF. 10219' 8.5" 450 sx Class G & 250 sx AS I
24 Perforalions open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
3.5" 9691' 9663'
9904'- 9921' MD 4 spf
9938' - 9954' M D 4 spf 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
9976' - 10004' M D 4 spf DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9904'-9921 ', 9938'-9954', 224782# behind pipe,2700# 10/14 in wellbore
9976'-10004'
27 PRODUCTION TEST
Date Firsl Production IMelhod of Operation (Flowing, gas lift, etc.)
I
Date of Test Hours Tested TEsTPRODUOTION FOR OIL-BBLpERiOD ¢' GAS-MOF WATER-BBL I CHOKE SIZE I GAS-OIL RATIO
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL tOIL GRAVITY-APl (coif)
I
Press. 24-HOUR RATE ¢
28 CORE DATA
Brief description of lilhology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
FEB 0 1 i~gG
Alaska 0~! & ~_~ 0~n~. Commission
-
Form 10-407 Submit in duplicate
Rev. 7- ~ -80 CONTINUED ON REVERSE SIDE
_;29. 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and 9rarity,
MEAS DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Top Kuparuk C 9705' 6493'
Bottom KuparuK C 9754' 6525'
Top Kuparuk A 9887' 6612'
Bottom Kuparuk A 10024' 6702'
..
·
FEB 0 1 1. 98
Alaska Oil & Gas Cons. Commission
An,~orsge
31. LIST OF A'I-I'ACHMENTS
Daily Drillin9 Histoq/
32. I hereby certify that the foregoing is true and correct to the best of my knowlege.
Signed Title DATE
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
Date: 1/31/96
ARCO ALASKA INCORPORATED
WELL SUMMARY REPORT
Page: 1
REMEDIAL AND COMPLETION OPERATIONS
WELL:3C-08 RIG:NORDIC
WELL ID: 998481 AFC: 998481 TYPE:
STATE:ALASKA
AREA/CNTY: NORTH SLOPE EAST
FIELD: KUPARUK RIVER UNIT
SPUD:07/13/85 START COMP:
BLOCK:
FINAL:
WI: 0% SECURITY:0
AFC EST/UL:$ OM/
API NUMBER: 50-029-21390-00
OM
11/14/95 ( 1)
TD: 0'
PB: 10117'
SUPV: DLW
DAILY:
11/15/95 ( 2)
TD:10234'
PB:10137'
SUPV:dEB
DAILY:
11/16/95 (3)
TD:10234'
PB:10137'
SUPV:dEB
DAILY:
11/17/95 ( 4)
TD:10234'
PB:10137'
SUPV:dEB
DAILY:
11/18/95 ( 5)
TD:10234'
PB:10137'
SUPV:dEB
DAILY'
N/D TREE MW: 9.3 LSND
R/U kill lines open ARCO flow lines, pump sea water down
tbg taking returns from annulus holding back pressure to
kill well. Observe well. N/D tree.
$48,100 CUM: $96,200 ETD: $0 EFC: $96,200
RIH W/CHEM. CUTTER ON E-L MW: 9.6 LSND
Test BOPE to 3500 psi, annulus to 3000 psi. Pull tubing
hanger to floor and LD tubing hanger. Work pipe & circulate,
pulling up to 100K% (94K on tubing), tubing hung up and
won't pull free. RIH with chemical cutter.
$33,440 CUM: $163,080 ETD: $0 EFC: $163,080
RIH W/FTA %I-PU DP MW: 9.6 LSND
RIH w/chemical cutter and tie into tubing string. Cut
tubing @ 9649' MD. POH. Monitor well, dead. POH - LD 2-7/8"
completion assembly. RIH with FTA %1.
$50,384 CUM: $263,848 ETD: $0 EFC: $263,848
RIH W/FTA %2 MW: 9.7 LSND
RIH w/FTA %1. Tag & latch onto tubing stub @ 9636'. Caught
packer & tailpipe. Work packer free & push down hole 2
joints, TOF to 9695', packer to 9799'.Work pipe trying to
circulate, packing off, only slight circulate around packer
or downhole injection. Pulled 2 stands & lost packer, OEJ
(previously sheared) apparently separated. Broke
circulation, normal circulating pressure. Circulate hole @
80 spm, 1200 psi. Gas cut returns at bottoms up, close
annular & continue circulating through open choke to poor
boy degasser until once around. Monitor well, returns still
gas cut. Continue circulating down flowline, 85 spm, 1250
psi. Returns up to 9.6+ ppg after twice around. Monitor
well, no flow. POH with FTA %1. LD fish. Recovered 15' stub
2-7/8" tubing + 1 joint + bottom GLM + 1 joint + OEJ
barrel. Tubing was buckled, particularly the joint between
the GLM & OEJ barrel. RIH w/FTA %2.
$32,222 CUM: $328,292 ETD: $0 EFC: $328,292
CIRCULATE OUT GAS CUT MUD MW: 9.8 LSND
RIH with FTA %2 to 9726'. Tag top of slick stick & latch
onto same @ 9782'. Work packer free. POH w/FTA %2 and fish.
Recovered all packer and tailpipe assembly. RIH with BHA
~1. Tag fill @ 9900'. Break circulation, mud gas cut.
Circulate out gas cut mud. Prepare to clean out fill.
$32,855 CUM: $394,002 ETD: $0 EFC: $394,002
Date: 1/31/96
ARCO ALASKA INCORPORATED
WELL SUMMARY REPORT
Page: 2
11/19/95 ( 6)
TD:10234'
PB:10137'
SUPV:DEB
DAILY:
LOAD 3-1/2" TUBING INTO S MW:10.0 LSND
Wash out very soft fill & ream from 9900' to 10128' PBTD
(10137' Parker RKB) . Circulate 2 hole volumes. Shaking out
frac sand fill. Frac sand kept coming at reduced rate.
Blowdown & standback kelly. Rotate and circulate hole clean
@ 9875' (just above 'A' sand perfs). POH with BHA ~1. Load
3-1/2" tubing and jewelry into pipe shed.
$42,121 CUM: $478,244 ETD: $0 EFC: $478,244
11/20/95 (7)
TD:10234'
PB:10137'
SUPV:DEB
DAILY:
ND BOPE MW:10.1 LSND
Run 3-1/2" single completion assembly. Drop packer setting
ball & circulate down to SOS. Pressure tubing to 2500 psi
and set packer. Held pressure for 30 minute test, OK. Bled
tubing to 500 psi and pressured annulus to 2500 psi for 15
minute test, OK. Set BPV and test to 500 psi, OK. ND BOP
stack.
$147,562 CUM: $773,368 ETD: $0 EFC: $773,368
11/21/95 ( 8)
TD:10234'
PB:10137'
SUPV:DEB
DAILY:
RIG RELEASED MW: 0.0
NU tree. Test packoff to 5000 psi. Test tree to 5000 psi.
Displace well to seawater. Reverse circulate 80 bbls diesel
into annulus, holding back pressure on choke. Connect
annulus to tubing and U-tube diesel into tubing until both
sides equalized. Secure well. Release rig @ 1600 hrs.
11/20/95.
$18,310 CUM: $809,988 ETD: $0 EFC: $809,988
End of WellSummary for We11:998481
FEB 0 ] ]99 ,
ARCO Alaska, Inc., ..... ~ ~
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
RETURN TO:
ARCO ALASKA, INC.
ATTN : Kuparuk Records Clerk
ATO 1119
P. O. Box 100360
Anchorage AK 99510
Transmitted herewith are the following items.
return one signed copy of this transmittal.
Final Prints/ Schl/ One * of each
Date:12-19-85
Transmittal No.: 5484
Please acknowledge receipt and
--'~ 1R-13 /i CBL/ Var. Den. 08-11-85 Run #1 5940-8443
~ ~ 1R-13/ CET/CEL 08-11-85 Run #1 6182-8445
~ 1R-16 ' CET/CEL 08-22-85 Run #1 6836-8318
~ 3C-5 ~ CET/CEL 08-16-85 Run #1 7396-0028
~ ~3C-8/ CET/CEL 08-04-85 Run #1 8300-10112
/
Receipt Acknowledged:
STATE OF AK*BL/$E
NSK CLERK*BL
DRILLING FILES*BL
VAULT*films
Date:
ARCO Alaska. Inc. is a Subsidiary of AllanticRichfieldCompany
1. Type of Request: Abandon _ Suspend _
Alter casing _ Repair well
Change approved program _
'.~_.. STATE OF ALASKA .
ALASKA OIL AND GAS CONSERVATION coMMISSION ~
REPORT OF SUNDRY WELL OPERATIONS
2. Name of Operator
ARCO Alaska. Inc.
3. Address
P. O. Box 100360, Anchorage, AK 99510
Operation Shutdown _ Re-enter suspended well_
_ Plugging _ Time extension _ Stimulate ~
Pull tubing_ Variance _ Perforate _ Other
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
Plugs (measured)
None
6. Datum elevation (DF or KB)
RKB 84'
7. Unit or Property name
Kuparuk River Unit
feet
8. Well number
3C-08
9. Permit number
85-155
10. APl numbe/r
,5o-029-21 390
11. Field/Pool
Kuparuk River Oil Pool
4. Location of well at surface
522' FNL, 1013' FEL, Sec. 14, T12N, R9E, UM
At top of productive interval
1287' FNL, 1464' FEL, Sec. 12, T12N, R9E, UM
At effective depth
1103' FNL, 1211' FEL, Sec. 12, T12N, R9E, UM
At total depth
1031' FNL, 1113' FEL~ Sec. 12, T12N, R9E, UM
12. Present well condition summary
Total Depth: measured 10234' feet
true vertical 6839' feet
Effective depth: measured 1 01 37' feet Junk (measured)
true vertical 677 5' feet Norle
Casing Length
Structural 8 6'
Surface 5 2 3 0'
Intermediate
Production 1 01 8 9'
Liner
Perforation depth: measured
9904'-9921 ',
true vertical
6622'-6633',
Size Cemented Measured depth True vertical depth
1 6" 213 Sx CS II 1 1 6' 1 1 6'
9 5/8" 1580 Sx AS III 5260' 3732'
340 Sx Class G
7" 450 Sx Class G 1 021 9' 6830'
250 Sx AS I
9938'-9954',
6645'-6655',
9976'-1OOO4'
6670'-6688'
£C£1VED
Tubing (size, grade, and measured depth
2 7/8", J-55, 9825'M D
Packers and SSSV (type and measured depth)
Packer: Camco HRP-I-SP @ 9753' MD, SSSV: Camco TRDP-1A @ 1809"WIEfr~
13. Stimulation or cement squeeze summary
Refrac A Sands "~'rlOrage-
Intervals treated (measured) 9904'-10004' MD-RKB
Treatment description includin~ volumes used and final pressure Attached
14. Reoresentative Daily Average Production or In!ection Data
Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 250 125 0 1200 100
Subsequent to operation 425 170 0 1200 100
16. Status of well classification as:
Oil X Gas Suspended Service
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations X
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
_S. igned //~'~ ~,1 ~/'~ ~~,,~ z~_~ Title Sr. Operations Engineer
Form {0-404- R~/'06/15/§8
ARCO Alaska, Ir~ ~
Su,.~sidlary of Atlantic Richfield Company
WELL
~NTRACTOR
Hal l m'h~t +er~
REMARKS
IPBDT
JFIELD - DISTRICT. STATE
IOPERATION AT REPORT TIME
WELL SERVICE REPORT
DATE
E-~'. co,si':a'q o~ooo '
131.~
Iq3O
?.q 7~3
[] CHECK THIS BLOCK IF SUMMARY CONTINUED ON BACK
knots {Signe~ --
Y~ ~_/~ ~.,,~
UC ·
KUPARUK OPERATIONS ENGINEERING
WELL FI.LE
KUPARUK STIMULATION SUMMARY ,~-,,c. ~.~
WELL: :~C..,-
TUO
,MO
HOLE ANGLE
OATE:
CONTR ACTOR:
ARCO REP:
SANO PERI~ INTERUAL
,4 qqq(,-~oo=4
Iq~
ACTUAL
TIME ~ UOLUME
STG/CUM
COMPANY TYPE
g '~ ~1" £o-¢tq+t-'
DENSITY PHASING
-4 sl:~ 90'
4 s P~= cio'
~1 sPw ciO'
RATE PRESSURE PROP. PROP. ANN. UOLUME
~ ,[.~LLT..~]~ ~I~SH CONC. _W..T.,_ PRE.~ STG/CUM
EFF. PRO:
~0 POST
WHTPR: ~6~'c:) / -'-"-
I$1P: ~o / ~
LEAK OFF: 5MIN. ,,
EFF. SLURRY:
SO pOST
FRAC 6RRO: o. S>o / ------
TB6.FRIC: '~<, s"?.~
PERF FRIC: 0 / *-'-
I 0 MIN.
EFF. PROP: G.,~oo ~~,~
LO6 INTERURL:/v'~.
FLUIO TEMP: '~':'~
NOTES:
STATE OFALASKA :'~ '~'
co.s .v^ o, OMM SS O
~,.
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon _ Suspend _ Operation Shutdown _ Re-enter suspended well _
Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate ~
Change approved program _ Pull tubing _ Variance _ Perforate _ Other
2. Name of Operator
ARCO Alaska, In¢,
3. Address
P. O. Box 100360, Anchorage, AK 99510
5. Type of Well:
Development X
Exploratory _
Stratigraphic _
Service
i
4. Location of well at surface
522' FNL, 1013' FEL, Sec. 14, T12N, R9E, UM
At top of productive interval
1287' FNL, 1464' FEL, Sec. 12~ T12N, R9E, UM
At effective depth
1103' FNL, 1211' FEL, Sec. 12, T12N, R9E, UM
At total depth
1031' FNL, 1113' FEL, Sec. 12, T12N, R9E, UM
12. Present well condition summary
Total Depth: measured 10234' feet
true vertical 6839' feet
Plugs (measured)
6. Datum elevation (DF or KB)
RKB 84'
7. Unit or Property name
Kuparuk River Unit
8. Well number
3C-08
9. Permit number
85-155
10. APl number
50-029-21390
11. Field/Pool
Kuparuk River Oil Pool
feet
Effective depth: measured 10137' feet Junk (measured)
true vertical 6775' feet None
13.
Casing Length Size
Structural 8 6' 1 6"
Conductor
Surface 5230' 9
Intermediate
Production 1 01 89' 7"
Liner
Perforation depth: measured
9904'-9921 ',
true vertical
6622'-6633',
Tubing (size, grade, and measured depth
5/8"
Cemented Measured depth True vertical depth
213SXCSII 116' 116'
1580 Sx AS III 5260' 3732'
340 Sx Class G
450 Sx Class G 10219' 6830'
250 Sx AS I
9938'-9954', 9976'-10004'
6645'-6655', 6670'-6688'
2 7/8", J-55, 9825' M D -,..,.~,.¢~, nil & Gas C~n0~C0mmis~j0.P,
Packers and SSSV (type and measured depth)
Packer: Camco HRP-1-SP @ 9753' MD, SSSV: Camco TRDP-1A @ .A~_s~] ~u9 M y"D ~Anch0mg~~' ~u~e
Attachments Description summary of proposal X.~ Detailed operation program ~ BOP sketch _
14. Estimated date for commencing operation
June 30. 1989
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil _ X Gas-~ Suspended
Service
17. I hereby certify that the foreg~oing is true and correct to th¢_,best of my knowledge.
Si~lned //'~/~ 7 '/~ '~ ~ ~''~¢~ '~ '~/'itleFoR COMMISSlON2~¢ ~_,IsE/y~-z'rONLY J ~
Date
Conditions of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test~ Location clearance ~
Mechanical Integrity Test ~ Subsequent form require
Approved by the order of the Commission
ORIGINAL SIGNED BY
LONNIE C. SMITH
Approved Copy
Returned
Commissioner
IApproval No.
Form 10-403 Rev 5/03/89
SUBMIT IN TRIPLICATE
Well 3C-8
Permission to refracture Well 3C-8 in the A Sand is requested. This
well was originally fractured in September, 1985, with 11,000
pounds of sand. The proposed refracture treatment is designed to
more effectively stimulate this interval. BHP is estimated to be
3100 psi. No workover fluids or BOP equipment will be needed
during this job.
ARCO Alaska, Inc.
Date· August 5, 1988
Transmittal #: 7249
RETURN TO:
ARCO Alaska, Inc.
Attn: Brenda K. Miernyk
Kuparuk Records Clerk
ATO-1119
P.O. Box 100360
Anchorage, AK 99510-0360
Transmitted herewith are the following items. Please acknowledge receipt and return
one signed copy of this transmittal·
31-03 Kuparuk Stimulation Summary 7-29-88 #230DS361L
1 A- 1 0 Kuparuk Stimulation Summary 7- 2 7- 8 8 #230DS10AL
3C-08 Kuparuk Fluid Level Report 8- 0 1 - 8 8 Tubing
1 G-06 Kuparuk Fluid Level Report 8- 0 1 - 8 8 Tubing
3 K - 0 6 Kuparuk Fluid Level Report 8 - 0 1 - 8 8 Tubing
2 W- 0 5 Kuparuk Fluid Level Report 8 - 0 2 - 8 8 Tubing
1 C-(~8 Kuapruk Fluid Level Report 8- 0 2- 8 8 Casing
3 K- 3 Kuparuk Well Pressure Report 4- 1 8- 8 8 Amerada
.-
Receipt
Acknowledged:
DISTRIBUTION:
D&M
State of Alaska
SAPC
Mobil
Chevron
1. Status of Well Classification of Service Well
OIL []XX GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
ARCO A]aska, Inc. 85-155
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 029-21390
4. Location of well at surface 9. Unit or Lease Name
522' FNL, 1013' FEL, Sec.14, T12N, R9E, UM Kupaurk River Unit
At Top Producing Interval 10. Well Number
1287' FNL, 1464' FEL, Sec.12, T12N, R9E, UM 3C-8
At Total Depth 11. Field and Pool
1031' FNL, 1113' FEL, Sec.12, T12N, R9E, UM Kuparuk River Field
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Kuparuk River 0il Pool
82' RKBI ADL 25629 ALK 2562
12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116' No' of Completions
07/13/85 07/23/85 07/24/85*I N/A feet MSLI 1
17. Total Depth (MD+TVD) 18. Plug Back Depth(MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost
10234 'MD ,6839 'TVD 10137'MD,6775'TVD YES [~(X NO []I 1809 feetMD 1700' (approx)
22. Type Electric or Other Logs Run
FDC/CNL/GR, D I L/SFL/SP/GR, Gyro
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
16" 62.5# H-40 Surf 116' 24" 213 sx CS II
9-5/8" 36.0# J-55 Surf 5206' 12-1/4" 1580 sx AS Ill & 340 s~ Class G
7" 26.0# J-55 Surf 10219' 8-1/2" 450 sx Class G & 250 s~ AS I
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
9984' - 10,004' 2-7/8" 9825' 9753'
9984' - 9976'
9954' - 9938' w/4 spf, 90° phasing 26. ACID, FRACTURE, CEMENTSOUEEZE, ETC.
9921' - 9904' DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
N/A
27. N/A PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Date of Test Hours Tested PRODUCTION FOR IOIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO
TEST PERIOD ~
1
OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Flow Tubing Casing Pressure CALCULATED
Press. 24-HOUR RATE ~
28. CO R E DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
NON. RECEIVED
FEB 2 8 1986
AlaStOI 0tl & Gas Cons, Gomrni$$ior'
STATE OF ALASKA ~
· ALASKA'~L AND GAS CONSERVATION CO~iWMISSION ~!~q
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
* NOTE: Tubing was run and the well perforated 8/24/85. DAM/WC53 Submit in duplicate V'~
Form
10-407
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29.
NAME
Top Upper Sand
Base Upper Sand
Top Lower Sand
Base Lower Sand
GEOLOGIC MARKERS
MEAS. DEPTH
TRUE ~)ERT. DEPTH
6461 '
6522'
6614 '
.~d
FORMATION TESTS
'Include interval tested, pressure data, all fluids recovered and gravity,
9658'
9752'
9893'
Not Log~
GOR, and time of each phase.
N/A
31. LIST OF ATTACHMENTS
None
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed _ _ ~_~/~ _~ Title
Associate Engineer
Date ~°~-~ '~
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate prOduction from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached sUpplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
ARCO Alaska, Inc.
Post Office B(~"1(~0360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
October 31, 1985
Mr. C. V. Chatterton
Commi ssi oner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: 3C-8
Dear Mr. Chatterton'
Enclosed is a copy of the 3C-8 Well History (completion details) to
include with the Well Completion Report, dated 9/24/85. If you
have any questions, please call me at 263-4944.
Sincerely,
Gruber
Associate Engineer
J G/tw
GRU12/L57
Enclosure
RECEIVED
cc: 3C-8 Well File
iB85
Alaska Oii & Gas Cons. Commission
Anchorage,
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
ARCO Oil and Gas Company
Daily WelT History- Final Report
Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold.
"Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not
required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire
operation if sl3ace is available.
I Accounting
District .ICounty or Parish IState
Alaska North Slope Borough
Field ~Lease or Unit
Kuparuk River I ADL 25629
Auth, or W.O, no. ITitle
AFE 604879 I Completion
Nordic 1 API 50-029-21390
Operator IA.R.Co. W.I. rTotal number of wells (active or inactive) on thisI
AECO Alaska, Inc. 56 24% Icost center prior to plugging and
· Jabandonment of this well
Spudded or W.O, begun J Date IHour J Prior status if a W.O.
Complete I 8/23185 ! 0200 hrs. I
cOSt center code
Alaska
IWell no.
3C-8
Date and depth
as of 8:00 a.m.
Complete record for each day reported
7" @ 10,219'
10,137', RIH to Perf
10.3 Brine (NaCl/NaBr)
Accept ri~ @ 0200 hrs, 8-23-85. NU & tst BOPE; OK.
perf f/9984'-10,004' w/4" gun, @ 4 SPF.
8/23/85
8/24/85
RU SOS,
7" @ 10,219'
10,137' PBTD, RR
Crude/Diesel
Perf w/4" guns, 4 SPF, 90° phasing, f/9976'-9984',
f/9938'-9954', & f/9904'-9921'. RIH w/2-7/8" compl assy.
Retrv pkr @ 9753', "D" nipple @ 9791' SSSV @ 1809', & TT @
9825'. Drop ball, set pkr, tst SSSV; OK. Shear SBR, shear out
Displ well w/diesel & crude. Set BPV.
ball, ND BOPE, NU & tst tree.
RR @ 0200 hrs, 8-24-85.
Old TD New TD
Released rig Date
0200 hrs. 8/24/85
Classifications (oil, gas, etc.)
Oil
RECEIVED
LPB Depth
A~aska 0J~ & C=.a.~ Ct, ns ,..~t~3~' ?BTD
/Kind pf rig ........ ;~,[,,~oo~0~
Ar~CT~0ra~S Rotary
Type completion (single, dual, etc.)
Single
Producing method Official reservoir name(s)
Flowing Kuparuk Sands
Potential test data
Well no. Date Reservoir Producing Interval Oil or gas Test time Production
Oil on test Gas per day
Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date
corrected
The above Is correct
Signature I Date ITitle
~)f~ /0- ~Q-~ Drilling Superintendent
For form prepa 'on and di~ribution,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87.
ARCO Alaska, Inc.
Post Office B~'1C'~00360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
October 9, 1985
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: 3C-8
Dear Mr. Chatterton'
Enclosed is a copy of the 3C-8 Well History to include with the
Well Completion Report, dated 9/18/85. If you have any questions,
please call me at 263-4944.
Sincerely,
J. Gruber
Associate Engineer
JG/tw
GRU11/L143
Enclosure
ARCO Alaska, Inc. is a Subsidiary of AllanticRichfieldCompany
ARCO Oil and Gas Company
Well History - Initial Report - Daily
Inslfuctlona: Prepare and submit the "Initial Report" orr Ihe first Wednesday after a well is spudded or workover operations are started.
Dally wor~ prior to spudding should be summarized on the form giving inclusive dates only.
District
Alaska
Field
ICounty. parish or borough
North Slope Borough
ADL 25629
or
Unit
Title - -
Drill
State
Alaska
Kuparuk River
Auth. or W.O. no.
AFE 604879
Parker 191
AP1 50-029-21390
Well no.
3C-8
Operator
ARCO Alaska, Inc.
Spudded or W.O. begun
Spudded
Date IHour
7/13/85
Date and depth
as of 8:00 a.m.
7/13/85
thru,
7/15/85
7/16/85
7/17/85
7/18/85
7/19/85
Complete record for each day reported
0600 hrs.
IARCO W.I.
Prior status if a W.O.
56.24%
16" @ 116'
3292', (3185'), Drlg
Wt. 9.7, PV 16, YP 19, PR 9.5, WL 10.5, Sol 9
Accept rig @ 1200 hfs, 7/12/85. NU 20" diverter sys. Spud
well @ 0600 hfs, 7/13/85. Drl, DD & surv 12¼" hole to 3292'.
451', Assumed vertical
672', 3.5°, N4OE, 671.86 TVD, 6.68 VS, 5.17N, 4.34E
1064', 15.4°, N49.9E, 1057.37 TVD, 73.57 VS, 53.16N, 51.13E
1550', 27.5°, N48.9E, 1509.53 TVD, 249.27 VS, 170.22N, 182.16E
2208', 42.5°, N47.1E, 2051.61TVD, 618.65 VS, 418.09N, 456.02E
16" @ 116'
5225', (1933'), TOH to log
Wt. 10, PV 23, YP 22, PH 9.5, WL 7.2, Sol 9
Drl to 5225', CBU, short trip, CBU before POH to log.
3600', 55.6°, N45E, 2897.53 TVD, 1720.02 VS, 1199.51, 1234.46
4574', 59.4°, N48.7E, 3427.87 TVD, 2536.48 VS, 1759.71, 1828.64
5179', 59.9°, N48E, 3731.66 TVD, 3059.61VS, 2104.00, 2222.62
9-5/8" @ 5206'
5225', (0'), Prep to rn csg
Wt. 10, PV 18, YP 14, PE 9.5, WL 7.2, Sol 9
TOE. RU Schl, RIH w/ DIL/SFL/SP/GR, hit bridge @ 2460', POH,
RD Schl. RIH f/wiper'trip, rm 2429'-2842', C&C, TOH. RU Schl,
log DIL/SFL/SP/GR f/5160'-surf, POOH, RD Schl. TIH, make
cond'g rn f/9-5/8" csg, TOH.
9-5/8" @ 5206'
5225', (0'), TIE
Wt. 9.1, PV 7, YP 8, PE 10, WL 14, Sol 4
Fin POOH. RU & rn 119 ]ts, 9-5/8", 36# BTC csg. Cmtd 9-5/8"
csg w/1589 sx AS III & 340 sx Class G. FC @ 5116', FS @ 5206',
ND diverter, NU BOPE & tst. PU BHA, TIH.
9-5/8" @ 5206'
6400', (1175'), Drlg
Wt. 9.1, PV 10, YP 5, PR 10, WL 16, Sol 3
TIH, tst csg to 1500 psi. DO FC, cmt, FS + 10'
to 5235'. Conduct LOT to 11.5 ppg EMW. Drl 8½" hole to 5431',
POOH f/turbine, TIH, drl to 6400'.
5414', 52.4°, N48.3E, 3862.56 TVD, 3254.78 VS, 2234.21N, 2368E
5945', 53.3°, N47.aE, 4183.23 TVD, 3678.02 VS, 2517.14N, 2682.77E
The above is
S~a.~ corre%
· X%~~R V,r. G. CONGDON
For form preparation and distribution,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87.
IOateN \ ITM
Drilling Superintendent
ARCO Oil and Gas Company
Daily Well History--Interim
Inatrucllona: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing Work performed.
Number ali drJJ! stem lasts sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final
completion. Report official or representative lest on "Final" form. 1} Submit "lnlerim" sheets when filled out but not less frequently than every 30 days, or (2}
on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion.
District
Field
Date and depth
as of 8:00 a.m.
I County or Parish
Alaska North Slope Borough
I Lease or Unit
Kuparuk River ADL 25629
Complete record for each day while drilling or workover in progress
7/20/85
thru
7/22/85
7/23/85
7/24/85
IState
Alaska
Well no.
3C-8
9-5/8" @ 5206'
9954', (3554'), Drlg
Wt. 10.2, PV 12, YP 6, PH 10, WL 6, Sol 9
Drl & surv 8½" hole to 9954'.
6632', 51.4°, N46.6E, 4602.84 TVD, 4221.91VS, 2886.71N, 3081.87E
7882', 51.2°,
8563', 51.9°,
8944', 51.7°,
9317', 51.2°,
9696', 49.6°,
9868', 49.2°,
N48.3E, 5379.32 TVD, 5201.18 VS, 3560.62N, 3792.79E
N51.4E, 5805.11 TVD, 5732.14 VS, 3899.73N, 4201.94E
N50.6E, 6040.72 TVD, 6031.13 VS, 4088.16N, 4434.63E
N50.2E, 6273.17 TVD, 6322.58 VS, 4274.10N, 4659.40E
N53.9E, 6516.03 TVD, 6612.81 VS, 4453.04N, 4888.84E
N54.4E, 6627.96 TVD, 6742.65 VS, 4529.52N, 4994.69E
9-5/8" @ 5206'
10,051', (97'), RD Schl
Wt. 10.2, PV 12, YP 6, ?H 9.5, WL 6, Sol 10
Drl 8½" hole to 10,051', 7 std short trip, CBU, POOH. RU Schl,
rn FDC/CNL/GR f/10,033' - 9500' WLM & 6275' - 5206' WLM. Rn
DIL/SFL/SP/GR f/10,033'-5206' WLM. RD Schl.
9-5/8" @ 5206'
10,234', (183'), Rn'g 7" csg
Wt. 10.3, PV 14, YP 10, PH 9.0, WL 6.2, Sol 10
TIH, rm f/9948'-10,051', drl 8½" hole to 10,234', 7 std short
trip, CBU, POOH, LD DP. Chg rams to 7" & tst bonnets. RU & rn
7" csg.
The 8hove is correct
For form preparation and distribution
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
[Oal~ , ITitle
Drilling Superintendent
ARCO Oil and Gas company
Daily Well History-Final Report
Inslruclions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold.
"Final Reporl" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an ollicial test is not
required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire
operation if space is available.
Dislrict lCounty or Parish
Alaska
Field ILease or Unit
Kuparuk River
Auth. or W.O. no. ITitle
AFE 604879
IAccounting cost center code
state Alaska
Parker 191
North Slope Borough
ADL 25629
IWell no.
3C-8
Drill
API 50-029-21390
Operator
ARCO Alaska, Inc.
Spudded or W.O. begun
Spudded
Date and depth
as of 8:00 a.m.
7/25/85
JA.R.Co. W.I.
56.24%
Date 7/13/85
Complete record for each day reported
Iotal number of wells (active or inactive) on this
DSt center prior to plugging and I
bandonment of this well
I
our I Prior status if a W.O.
0600 hrs.
I
7" @ 10,219'
10,137' PBTD, RR
Fin rn'g 258 jts + mkr, 7", 26#, J-55 HF-ERW BTC R-3 csg to
10,219', FC @ 10,137'. Cmt w/450 sx C1 "G" w/3% KC1, .8% D-60
& .2% D-46. Full rtns throughout, bump plug. CIP @ 1415 hrs,
7/24/85. ND BOPE, instl tbg spool & tst. Winterize 7" x
9-5/8" ann. RR @ 2130 hfs, 7/24/85.
Old TO New TD I PB Depth
10,234' (7-24-85) 10,137' PBTD
Released rig Date Kind of rig
2130 hrs. 7/24/85 Rotary
Classifications (oil, gas, etc.) Type completion (single, dual, etc.)
Oil Single
Producing method Official reservoir name(s)
Flowing Kuparuk Sands
Potential test data
~/~11 no. Date Reservoir Producing Interval Oil or gas Test time Production
Oil on test Gas per day
Pump size, SPM X length Choke size T.P. C.P. Water % GaR Gravity Allowable Effective date
corrected
The above is correct
.
For form preparation and distribution,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87,
[Oat~ \ [Title
Drilling Superintendent
ARCO Alaska, Inc.
Post Office B't~'~'~0360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
September 24, 1985
Mr. C. V. Chatterton
Commi s s i one r
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: 3C-8
Dear Mr. Chatterton:
Enclosed are the Well Completion Report and gyroscopic survey for
3C-8. I have not yet received copies of the Well Histories. When
I do, I will forward them to you.
If you have any questions, please call me at 263-4944.
Sincerely,
Gruber
Associate Engineer
JG/tw
GRU11/L122
Enclosures
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
. - STATE OF ALASKA
ALASKA~_..- AND GAS CONSERVATION CO..~llSSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well ~,
OIL I~(x GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 85-155
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 029-21390
4. Location of well at surface 9. Unit Lease Name
~ VERJ~E~-! or
522' FNL, 1013' FEL, Sec.14, T12N, R9E, UM_ ~ | Kupaurk River Unit
At Top Producing Interval ~I 10. Well Number
1287' FNL, lZ~64' FEL, Sec.12, T12N, RgE, UN~ 3C-8
At Total Depth 11. Field and Pool
1031' FNL, 1113' FEL, Sec.12, T12N, R9E, UM Kuparuk R~ver F~eld
5. Elevation in feet (indicate KB, DF, etc.) ~ 6. Lease Designation and Serial No. Kuparuk River 0i ] Pool
82' RKBJ ADL 25629 ALK 2562
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. ~ 15. Water Depth, if offshore 16. No. of Completions
07/13/85 07/23/85 07/2~/85'J N/A feet MS L 1
17. Total Depth (MD+TVD) 118.Plug Back Depth (M~D) 19. Directional Survey ~ 20. Depth where SSSV set 21. Thickness of Permafrost
10234'MD,6839'TVD 10137'~,6775'TVD YES ~X NO ~~ 1809 feet MD 1700' (approx)
~2. Type Electric or Other Logs Run
FDC/CNL/GR, D IL/SFL/SP/GR, Gyro
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
16" 62.5~ H-40 Surf 116' 24" 213 sx ~ II
9-5/8" 36.0~ J-55 Surf 5206' 12-1/4" 1580 sx AS III & 340 sx Class "G"
..
7" 26.0~ J-55 Surf 10219' 8-1/2" 450 sx Class "G"
-
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
9984' - 10~004' 2-7/8" 9825' 9753'
9984' - 9976'
9954' - 9938' w/4 spf, 90° phasing 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
9921 ' - 9904' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
N/A
27. N/A PRODUCTION TEST
Date First Production J Method of Operation (Flowing, gas lift, etc.)
DateofTest Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ~GAS-OILRATIO
TEST PERIOD ~
I
, ,
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE ~
28. CORE DATA
,
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips._ ~
Form 10-407 * NOTE: Tubing was run and the well perforated 8/24/85. DRH/WC25 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE -
29. 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and graviiy,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Top Upper Sand 9658' 6461' N/A
Base Upper Sand 9752' 6522'
Top Lower Sand 9893' 6614'
Base Lower Sand Not Logc~d
31. LIST OF ATTACHMENTS
Gyroscopic Survey ~
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed i~ ~ ~~ Title A$$°¢iate Encjineer Date ~-~4-~'
INSTRUCTIONS
General' This form is designed for submitti.ng a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for eaqh additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
NEW PROJECTS ENGINEERING
ZRANS~ITT~t # f] ~ ~ ~
TO:
DATE:
FROM: L. K. SMITH/P. S' BAXTER
WELL NAME
TRANSMITTED HEREWITH ARE THE FOLLOWING:
PLEASE NOTE: BL - BLUELINE, S - SEPIA, F - FILM, T - TAPE, PC - PHOTOCOPY
RECEIPT ACKNOWLEDGED:
PLEASE RETURN RECEIPT TO:
ARCO ALASKA,.INC. 0°'~?~/oo
ATTN: PATSY fi. BAXTER ATO/507
P. O. BOX 100360
ANCHORAGE, AK 99510
ARCO Alaska, Inc.
Post Office B~,..~.J360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
September 23, 1985
Mr. C. V. Chatterton, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mr. Chatterton:
Attached in duplicate are subsequent notices on the
following wells at the Kuparuk River Field:
Well Action
Date Performed
1Y-1 Fracture 9/10/85
1Y-7 Fracture 9/10/85
3C-5 Fracture 9/12/85
3C-7 Fracture 9/12/85
3C-8 Fracture 9/12/85
If you have any questions, please call me at 263-4212.
T. M. Drumm
Kuparuk Operations Coordinator
TMD / kmc
Attachment (Duplicate)
Alask;~ 0it & Gas Cons. commission
Anchorage
ARCO Alaska, Inc. is a Subsidiary of AtlanlicRichfieldCompany
STATE OF ALASKA
ALASKA O'~L AND GAS CONSERVATION C0'I~MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL E~
2. Name of Operator 7. Permit No.
ARCO ALASKA, INC. 85-155
3. Address 8. APl Number
P. O. BOX 100360, ANCHORAGE, ALASKA 99510 50- 029-21390
OTHER []
4. Location of Well
SURFACE LOCATION: 522'FNL, 1013'FEL, Sec. 14,
T12N, R9E, UM
5. Elevation in feet (indicate KB, DF, etc.)
RKB 82' PAD 47'
6. Lease Designation and Serial No.
ADL 25629 ALK 2562
9. Unit or Lease Name
KUPARUK RIVER UNIT
10. Well Number
3C-8
11. Field and Pool
KUPARUK RIVER FIELD
KUPARUK RIVER OIL
POOL
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing
Stimulate [] Abandon [] Stimulation ~] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
On September 12, 1985, the "A" sands of Kuparuk well 3C-8 were
hydraulically fractured and propped to improve production. The
treatment consisted of 283 BBLS of gelled diesel as pad and carrying
fluid and 756 LBS of 100 mesh and 11,051 LBS of 20/40 sand as
proppant. 52 BBLS of gelled diesel was used as a flush.
Prior to pumping, equipment and lines were tested to 5000 psi.
ECE ¥ED
Alaska 0ii & Gas Cons. c0mmissi0-~
ar:ch0rag~
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~, /~,~ ~_~,44,m~l~q~ Title KUPARUK
OPEi~ATIONS COORDINATOR'
The space below for Commission use
Date
9/23/85
Conditions of Approval, if any:
Approved by
By Order of
COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
ARCO Alaska, Inc.
Post Office Bb"~"~00360
Anchorage, Alaska 99510
Telephone 907 276 1215
September 19, 1985
Mr. C. V. Chatterton
Commi ssi oner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: 3C-8
Dear Mr. Chatterton'
Enclosed is the Well Completion Report for 3C-8. The bottomhole
location, TVDs, and geologic markers will be submitted when the
gyroscopic survey is run. Also, I have not yet received the Well
Histories. When I do, I will forward copies to you.
If you have any questions, please call me at 263-4944.
Sincerely,
· Gruber
Associate Engineer
JG/tw
GRU11/L74
Enclosure
RECEIVED
Alaska Oil & Gas Cons. Commission
Anchorage
ARCO Alaska, Inc. is a Subsidiary of AtlanlicRichfieldCompany
STATE OF ALASKA ,
ALASKA ~ AND GAS CONSERVATION CO..~glSSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL E~x GAS [] SUSPENDED [] ABANDONED [] SERVICE []
,.
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 85-155
3. Address 8. APl Number
P. 0, Box 100360, Anchorage, AK 99510 50- 029-21390
4. Location of well at surface 9. Unit or Lease Name
522' FNL, 1013' FEL, Sec. 14, T12N, RgE, UN Kuparuk River Unit
At Top Producing Interval 10. Well Number
To be submitted when gyro is run. 3C-8
At Total Depth 11. Field and Pool
TO be submitted when gyro is run. Kuparuk River Field
5. Elevation82, RKBin feet (indicate KB, DF, etc.)[I,6' ADLLease25629DesignationALKand2562Serial No. Kuparuk River 0i 1 Pool
12. Date Spudded07/13/85 13. Date T.D. Reached07/2:3/85 14' Date C°mp" Susp' °r Aband' I 15' Water Depth' if °fish°re 116' N°' °f C°mpleti°ns07/24/85* N/A feet MS L 1
17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD)~ 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost
10234'MD 10137'MD YES [] NO I~XI 1809 feet MD 1700' (Approx)
22. Type Electric or Other Logs Run
FDC/CNL/GR, D I L/SFL/SP/GR
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASINGSlZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
16" 62.5# H-40 Surf 116' 24" 213 sx CS II
9-5/8" 36.0# J-55 Surf 5206' 12-1/4" 1580 sx AS III & 340 s; Class G
7" 26.0# J-55 Surf 10219' 8-1/2" 450 sx Class G
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
9976' - 10,004' 2-7/8" 9825' 9753'
9938' - 9954' w/4 spf, 90° phasing
9904' - 9921 ! 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
N/A
27. N/A PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
Date of Test Hours Tested .PRODUCTION FOR 'alL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO
TEST PERIOD I~
Flow '~ubing Casing Pressure CALCULATED.~, OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
NONE
kECE!VED
Alaska Oi! a 6as Cons. Co~mission
Anchorago
Form 10407 * NOTE: Well was run and the well perforated 8/24/8~. TEMP2/WC10 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30. .
·
GEOLOGIC MARKERS I FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
To be submitted wh.~n gyro is run. N/A
i'
31. LISTOF ATTACHMFNTS
Nnn~a
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~6 ~ ~ Title Associate Engineer Date 9~/~-~~
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump~ Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
ARCO Alaska, In
Post Office Box 100360
Anchorage. Alaska 99510-0360
Telephone 907 276 1215
DATE: 09-17-85
TRANSMITTAL NO: 5354
RETURN TO:
ARCO ALASKA, INC.
KUPARUK OPE IiATIONS
RECORDS CLERK
ATO-1115B
P.O. BOX 100360
ANCHORAGE, AK 99510
ENGINLERING
TRANSMITTED HEREWITH ARE THE FOLLOWING ITEMS. PL]~ASE ACKNOWLEDGE
RbC~.'IPT AND RETUItN ONE SIGN~JD COPY (JF THIS TRANSMITTA~L.
OPEN HOLE FINALS/ SCHL
(ONE * OF EACH)
3B-12 -"--5" DIL/SFL-GR ~
',J 2" DIL / bFL-GK.--~
~~'"'-~"'-5" DEN/NEUU~'''~ ----~ PORO
~'-2" DEN/N;.: PORO
. DE N/N EU ~.-'~~AW
-~'~'--2" DEN/NEU "- RAW
'------...CYBE~LLOOK./
PORO
PO RO
MAW
PO RO
PORO
RAW
3B-11 DIL/SFL-GR
~"--2" ~- DIL/$FL-GR
~5" _. DEN/Nk~U
, DE N/N
~ 2 "-'"ITL"-N?N E U
~ CYb EITLOOK
2'z-13 ~5" -'- DIL/SFL-GR
%2
"~- DIL/SFL-GR
~5 ,']~'~",~
DEN/NEU-GR
i 2"~" DEN/NEU-GR
~J5''/ DEN/NEU-GR
~2
'~v CYB E KL O OK
07-03-85 RUN #1 4030-8232
07-03-85 RUN #1 4030-8232
07-03-85 RUN #1 5600-8206
07-03-85 RUN #1 -5600-8206
07-03-85 RUN #1 5600-8206
07-03-85 RUN #1 5600-8206
07-03-85 RUN ~1 7500-8183
06-26-85 ~UN #1 4213-9198
06-26-85 RUN #1 4213-919~
06-26-85 RUN ~1 5800-9167
06-26-85 R0N ~1 5800-9167
Ob-2b-85 RUN ~1 5~00-9167
06-26-8 5 RUN ~1 5800-9167
0b-26-85 kUN ~1 8400-9143
07-05-85 RUN #1 4204-8502
07-05-85 RUN #1 4204-8502
07-05-85 RUN #1 4700-8476
07-05-85 RUN #1 4700-8476
07-05-85 RUN #1 4700-8476
07-05-85 RUN #1 4700-8476
07-05-85 RUN #1 7600-8453
3C-8
PORO
PORO
RAW
RAW
07-23-85 RUN
07-23-85 RUN
07-22-85 RUN
07-22-8 5 RUN
07-22-85 RUN
07-22-8 5 RUN
07-23-85 RUN
RECEIPT ACKNOWLEDGED:
BPA~
S. CUR~I~R
CHEVRON
D & M*BL
DRILLING*BL
L. JOHNSTON
i~OBIL
NSK CLERK*DL
DISTRIBUTION:
~. PAbHER
EXXON
PHILLIPS OIL
J. liATHMELL*~L
#2 5207-10024
#2 5207-10024
DATE;
STATE OF ALASKA*BL
SUt~IO /SE
UNION
K.TULIN/VAULT*FILM
ARCO Alaska. Inc. is a Subsidiary of AtlanficRichHeldCompany
ARCO Alaska, Inc.
Post Office a~r~ro0360
Anchorage, Alaska 99510
Telephone 907 276 1215
August 28, 1985
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: 3C-8
Dear Mr. Chatterton:
Enclosed are the Well Completion Report for 3C-8. The bottomhole
location, geologic markers, TVDs, and tubing details will be
submitted when the gyroscopic survey is run and the well completed.
If you have any questions, please call me at 263-4944.
Sincerely,
~Gruber
Associate Engineer
JG/tw
GRU11/L29
Enclosure
· ",...r: CO~i~iSSi,r.}F,'
Alaska Oil & Gas
·
Anchorage
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
STATE OF ALASKA
ALASKA-~..~_ AND GAS CONSERVATION CO..~_~AISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED r-~x ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 85-155
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 103-21390
4. Location of well at surface 9. Unit or Lease Name
522' FNL, 1013' FEL, Sec.14, T12N, RgE, UM Kupaurk River Unit
At Top Producing Interval 10. Well Number
To be submitted when gyro is run. 3C-8
At Total Depth 11. Field and Pool
To be submitted when gyro is run. Kuparuk River Field
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Kuparuk River 0i 1 Pool
82' RKB ADL 25629 ALK 2562
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions
07/13/85 07/23/85 07/24/85 N/A feet MS LI N/A
17. Total Depth (MD+TVD)18. Plug Back Depth(MD+-I-VD)19. Directional Surve.~/10234,MD 10137'MD YES ', .... NO ~,~ 1 20' Depth whereSSSV set [21' Thickness °f Permafr°stN/A feet MD 1700' (approx)
22. Type Electric or Other Logs Run '/
FDC/CNL/GR, D I L/SFL/SP/GR
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. !GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
16" 62.5# H-40 Surf 116' 24" 213 sx CS II
9-5/8" 36.0# J-55 Surf 5206' 12-1/4" 1580 sx AS II! & 340 sx Class "G"
7" 26.0# J-55 Surf 10219' 8-1/2" 450 sx Class "G"
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None N/A
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
N/A
27. N/A PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Date of Test Hours Tested PRODUCTION FOR el L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-el L RATIO
TEST PERIOD I~
Flow Tubing Casing Pressure CALCULATED=1~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE ~
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
,
Alaska 0il & Gas Cons. Commission
Form 10-407 DRH/WC11 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. i 30. . , : ...... ~ ....... ~ ~ ~ l
,,
.
NAME Include interval tested, Pressure data, all fluids recovered and gravity,
.. MEAS. DEPTH TRUEVERT. DEPTH i GOR,.and time of each phase.
To be submitted w~ ;n gyro is recei'~ed. N/A
· .
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
/0 M, j ,. Associate Engineer /-
Signed ~/?Od)(.~; ~' ~/-~-W~/L" Title Date
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from. more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval.reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28' If no cores taken, indicate "none".
Form 10-407
~UB.~URFACE
DIRECTIONAL
~URVEY
['~UIDANCE
[~ONTINUOUS
['~ OOL
Company
Well Name
Field/Location
ARCO ALASKA INCOP~gR4TED
3C-8 (522' FbIL, 1013' FEL, S14._TI2N. ROE.
I~UP~RUK. NORTH SLOPE. AT,AR]fA ,
Jol~ Reference No.
70780
G. JOHNSON
CUSTO~EW blSTI~G
FOR
~i{CO ALASKA, i~lC.
~'NCI.qEF~' ¢:. OI3HMSON
~E*,H~DS nF COr~PU'rATIr',~
TLtOI, LOC~TTO~,!: mA~IGF'~vi~L- avera~od deviation and azlmu~h
V~R~'lca[, sEr')'r~'.'.]~: ,.tn~Iz. DIST. PROJKC'rEn ONTO A T~RGET AZIt. tUTH OF NORTH 47 DEG 58 MIN EI~T
ARCO ;*~6ASVA, TNC.
NnRTn St, OPE, AI, A.qKA
pATE: R-SEP-R5
,LIq~RRPOT, ATED vAt',tiES FoR EV?:N 100 F'EFT OF
CoUPSm VCRTTCAL DOGLEG
DEV?ATInN ^ZluUTh SFC?ION SEVERITY
DEG MIN DFG ZT~ FEET DEG/~O0
TROR SdR-AEA
~EASURFD VRRTlrAL
DEPTN D~PTH DEPTH
O.nO O.On -~?.00
100,00 loO.On 18.00
~00.00 200.00 llg.O0
~O0.nO 3o0.00 2iR,O0
400.00 4no.O0 31R.O0
500.Ou 5oO.~,n 41~.O0
600.00 599.96 517,96
700,nO 6o9.73 ~17.73
RO0.O0 7o8.9~ 716.99
900.nO 8q7.31 R15.33
1.4 12 ~ 43 55 F 6!.71
16 50 N 46 35 ? 68.40
ld 51 ~ 47 41 ~ 1.1e.31
'71 O ~ 47 ~ E 153.63
73 50 ~' 48 59 F 191.~1
~h In ~ 49 27 F ~34.01.
?7 30 N 4~ 24 F~ 279.55
~9 .JO ~: 48 6 F 326.07
t2 & ~' 45 3G E 37P.41
34 28 M 44 3~ F 433.11
1000.00 9q4.77 o12.77
1100.00 !0o1.13 ]000.13
1200,00 1186 27 ]104.22
1~00.00 !2~0:14 1~9~.1.4
140o.00 1372.60 1~90.60
1500.00 ~.463.iq ]~1.19
1600.00 15~2.27 147~.72
l?O0.nO 1640.25 155~.25
1~00.00 1725.99
lgO0,O0 1809.6~ 1~27,63
~l 20 ~ 45 17 F 491..71
~9 57 N 45 4{ F 554.!0
43 7 r.; 4~ 27 E 620.~2
4b 2q ~,i 44 3R ~ 690.~0
49 55 ~! ~4 ~ F 76~.02
~2 5~ M 43 10 E 843.02
53 27 M 43 0 W 922.~3
53 17 ~ 43 n E 1007.~9
K3 19 N 43 17 ~ 108~.73
2000.~0 1.890.50 1~0~.~9
2100,00 1,968.6q 1RU6.&9
2200,00 2043,65. lg61,~5
2300,00 2114.b7 203~.57
2400.0U ~1~1.17 209Q.~7
2KO0.O0 2243.~6 2~61.~6
2600.o0 2303.16 222~.~
2700 O0 23~2.80 2780.~0
2~On~Oo ~a~2.b~
2~UO.OU ~4~2.27 2400.97
53 44 ~! 43 19 F 1~43.02
~3 52 ~,! 43 20 F 1323.43
~4 2~ ~ 4~ 3~ ~ 1404.]4
54 5~ N 43 4~ F 1485.54
55 g N 43 50 E 1567.~9
55 37 N 43 56 F 1640.38
q5 27 ~! 44 I F 173~.68
55 3~ ~! 44 1~ F ~g13,~5
K5 J? N 45 ~ F 1~96,15
~5 5q E 4.5 14 E 197R,73
3000.00 2541.54 245q.54
3100 O0 ~6flO.bO 2518.60
3200:00 2659.31 2577.31
3300.00 27~7.0~ 2635.00
3400.00 ~774,35 269~.~5
3500.00 28~1,1~ 2740,16
3600.00 78~7.67 2805.A7'"
3700.00 2944,~0 2862.~9
3~00.00 3001.00 2910.00
3900.00 3057.25 2q75.25
0,25
0,34
0,52
0,76
0,80
1,95
3.3?
3.63
2.00
2,49
1,98
2.07
3.j7
2.94,
0.60
3,2~
2,70
3,0~
3.24
3.75
3,50
2.~?
0.29
0.71
0,29
0,~9
0,17
0.20
0 2~
0:34
0'27
0'34
PAGE ,1
DaTE OF SUR%EY: 04-AUG-1985
KE~.LY BUSHING EhEVATION{ 82.00 FT
E.L'GTNrER: G, JOHNSON
R~CTANGI{bAR
NORTH/SOUTH
FEE'f
0.00
0.02
0.05
0,03
0,04
1.76
6,72
15.6~
~9.2n
COORDINATES
EAST/WEST
0.00
0.12
0.02
0,14
0.00
0,47
2,3~
6.73
14.72
26.83
45.81N 41
64'46 N 60
~5 4O N 83
108:76 N 108
134 26 N 137
1R1i71. N 169
101 77 N 203
223 2~ ~'~ 238
25~.37 N 276
297.3~ N 315
.80
.9t
.b4
.79
.07
.2~
.50
,94
,56
.10
62.01 h 42 22 E
88,69 N 43 22 E
119,54 N 44 24 g
153.83 N 45 0 E
191,~7 N 45 35 g
234,11 N 46 18 £
279.62 N 46 41 E
327,03 N 46 56 E
378,47 N 46 56 E
433.23 N 46 39 E
338.
382.
428.
478,
531,
5~8.
64'~.
7O5
764i
822
8.~
55
74
57
87
42
89
33
77
356.56
401.15
&48.53
~98.36
5~0.52
604.55
659.2]
713 90
76~1V0
823.76
491.88 N 46 27 E
554,32 N 46 2! E
620,48 N 46 i7 E
690,94 N 46 9 E
765.48 N 4~ ~9 E
881,
940.
998
1058
1117 1
1176 5
1215 8
~2q4 9
1353 6
1411.9
43
2O
99
05
9
0
9
6
0
2
878.95 g 1244.78 N 44 55 E
934,23 E 1325,43 N 44 49 g
989,89 E 1406,37 N 44 44 E
~046,25 E 1487 99 N 44 40 E
1103.00 £ 1569:94 N 44 38 E
1160,05 E 1652;23 N 44 35 E
1217 ~ E 1734 73 N 44 33 E
1274:7! r 1817:o9 a 44 32 E
1332.64 E 1899.52 ~ 44 ~3 E
139i.25 E 1982,19 N 4434 £
APCfl ;~b~SW.a, TaC.
~E~SIJR~D Vw. RTIUAI, VERT.TC~h
DE~TW D~.PTH
4000.OU ]112.89 3030.89
4100.00 ]167.9! JO~5.gl
4300.00 32~3.3R
4400.00 3394.~4 3~4~.~4
450~.~0 337~.~4 3~94.14
4600.~0 ~47~.9~ 3~44.96
4700.00 ~4~7.4~ 339K,42
4R00.O0 3527.41 ~445,41
4000.00 3577.3~ 3495.39
50UO.OU 3697.17 .~545.17
5~00.~0 ]676.92 3~94.q2
5200,00 ~777.1~ 3~4~.~
5300.00 37~0.43 369~.43
5400,00 38~9.0~ 3757.(~9
5500 O0 3900.3~
5&0~00 !9~0,94
5900.00 4.090,9~. 399R.O1
5gO0.O0 4140.57 405H,q')
6000.00 4200,0~ 41 IR.02
6~O0.n0 4259.3& 4177.~o
6~00.o0 431~.50 47j6.50
6400,00 '¢4~6.13 43~4.J. 3
6500 00 44~6,14 4414,!4
6600100 45~8,21 44'1~,?1
6700,~ 46~0.34 4q30,~4
6~00.00 46~2.S~ 4600.5~
6000,00 ~744.5~
7000.00 4606 56 4724.56
7100,00 4868144 4786.44
7~00.00 4930.2?
7~00.00 4901.71 4909.7!
7400.00 5052.9~ 4qTo.q~
7500.00 51~4.~1 5~37.01
7600.00 5177.q5 5095,4'5
7700.00 5240.i0
7800.00 5302.b~ 5720.6~
7900,00 5365,0~
CoU~ 5~' VERTTC.~I,
DEG .,Ila ,)~G a"ra FFET
56 18 t~I 4b 34 F 20o~.74
57 4 ~ 40 11 w 2145.18
58 18 N 40 $l ? 2229.70
58 ,~5 ~,~ 4b 55 F 2~15.06
59 11 ~ 4'7 ? W 240n.79
59 11 ~ 47 20 F 24~&.62
59 3~ ~' 47 26 E 257?.74
59 5~ ~ 47 34 E 2650,~7
60 ? N 47 47 F 2745.6~
K0 7 ~ 07 55 ~ 2~32.30
60 lP ~.: 47 45 F' 29!0.02
60 ? ~r 47 35 F 3005.77
5'~ 5q ~' 47 23 F 3~9~.92
56 7 ~ 47 26 ~ 3176.~4
~2 3a ~ 47 34 F 3~57.~0
~2 20 t.~ t7 .i6 E 3336.86
52 53 ~: 47 ~? F 341&.39
~3 1.? N 4.7 4& w 3496.35
53 1~ ~' 47 4~ E 357~.41
~3 24 ~.! 07 '~ F 3656.67
~3 '~ ~ 47 34 F Ja17.57
5~ 59 ~ 47 13 [: 3898.~0
53 59 ~'~ 4~ 59 ~ 3970.00
53 5~ ~ 40 40 ~ 405~.q3
51 5~ ~, 46 2~ F 4139.~7
5.l 40 r~ 40 34. F 4~1~.~6
~1 20 ~' 4~ 24 F 4~96.59
51 '~7 N 46 ~ F 4374.87
51 3~ N 45 4R W 4453.23
51 47 ~ 4~ 4~ E ~531.66
51 .i7 ~ 45 37 ~ 4610.1.5
51 5~ N 45 2R E ~688.72
52 R ~ 45 22 W ~767.~0
52 .£~ %~ 4b 2? ~ 484~.45
K1 24 ~4 46 30 E' 4924.91
51 10 ~ 40 44 F 500?,93
51 ia ~ 48 14 ~ 5080,8~
51 15 ~ 48 ~ E 515~,90
SI 22 ~ 48 20 ~ 5237.00
]-SEP-R5
PAGE
SURVEY: 04-AUG-1985
'2
DATE OF
KELbY RUSHING
ENGTNMER: G, JOHNSON
OF ~EAS~IH~D ~MPTH
D~JGbEG RECTANGIIhAR COORDINATES HORZZ, DEPARTURE
S~V~PlTY NORTH/SOUTH EAST/WEST DIHX,.. AZIMUTH
DE~/IO0 FEET FEET FE~.... DEG
1.65 1598,51 M 1510,25 £ ~148,*~¥~'N 44 39 E
.
0 65 1586 52 ~ ~511,75 ~ 223] N 44
0,52 1644.84 ~ 1634,1~
0,27 ~?n3.35 ~.! 1696.77 E 2404~25~ N 44 53 E
0.94 1761.6~ N 1759,75 £ ~490'02 N 44 58
0.29 ~916.6! ~ ~950.84
82.00 FT
0,27 3149 25 N 3262,22 E 4534,30 N 46 0 E
0,38 3204111 N 3318,45 E 4612,85 N 46 0 E
0,21 3259,19 N 33?4.57 E 4691.49 N 45 59 E
0.31 3314 54 N 3430.75 ~ 4770,34 N 45 59 E
0,33 34?4.-57 ~! 3543,49 E 4927 8~ N 45 58 $
0,52 3478 08 N 3b00 29 E 5005:9! N 45 59 E
0.~9 3530~78 N 3657~70 E 5083.82 N 46 0 E
0,54 35H2.65 N 3716 02 E 5161,80 N 46 2 E
.'0'.,~1 3634.54 M 3774:38 E 5239,83 N 46 4 E
0,20 ~603 86 ~ 9684 10 E 3739.58 N 45 52 E
0.36 2657199 N 2743167 E 3820.03 I~ 45 54 E
0,43 2712,57 N ~803,02
0,32 2767,58 M 2862 23
0,64 2822,92 N 2921;28 E 4062,36 N 45 58 E
1,79 287~,05 ~.I 2979'23 E 4142,34 N 45 59 ,.m
0,18 2931 93 M 3036.19
0,27 ~985187 N 3093,03
0,30 3040.[)0 N 3149.6~
0,17 3094,53 ~ 3205,96
O.3R 2052.~7 N 2079.42 ~ 2922.02 N 45 22 E
0.39 2111 26 N 2143.56 E 3008'70 N 45 26 E
3,74 21691~8 ~? 2207,29 E 3095,10 N 45 29 E
4,41 2226' 98 N 2269,57 E 3179,69 N 45 32 E
1.15 2281,68 N 7329'26 E 3260,60 N 45 35 E
1,0~ 2334,91N 2387,71 E 3339,6! N 45 ]8 E
0.42 ~3~8.33 N 2446.64 M 3419,09 N 45 4~ E
0.30 2442.07 w ?505,85 E 3499,00 N 45 44 E
0.23 24~5.8g N 2565,12 E 3579 01 N 45 47 £
0,42 2549,85 N' ~6P4,5~ F 3659122 N 45 49 E
TPUr
DEPTU
8000.00 5477.~1
8100.00 54~9,4Q
8300.n0 56!3.5~
8500.nd 57~7.56
86U0.00 57q8.~6
8ROO.OO ~9~2.42
9000.00 &046,16
990n.00 ~170.~7
9300.00
940~.00 &2~5.b7
9600.00
9700.a0 a4~g.O7
9~O0.nu ~blS.l~
10000.~0
10100.00 6750
$[~R-SEA
VF. PTTCAL DEVIATIn;~
DEPTH DEG NT~'.,I DFG ;,~T ~1
5345.31 51 32 ~., 4~ 12 ~
5~07.49 51 4n ~; aB 5 ?
5531.~8 51 45 ? 51 5 F
5~55.46 5~ 56 N 51 20 ~
5716.86 52 15 ? 51 ~ F
577~,49 51 4& ~' 51 17 F
5840,42 51 41 ~ 50 ~q F
5O6a.1~. 51 53 ~' ~0 1a m
615~,nl. 51 I.K ~? 49 1q ~
o777.~5 ~0 17 ? 49 56 ~
n341 . ~U 49 b3 ~'~51 b° ~
n40~.n7 ~9 35 ~: ~3 41 ~'
5a70.~8 49 2~ ~.I53 3° ~
,-)&6R.?3 48 21 ~ 54 11 F
0734,6B -!8 ~1. N 54 il w
6797.77 48 2] ~.? q~)~ t! F
DA L'E:
V~RTTCA. I~ DOGLFG
FFE' DEC/lO0
5315.97 0.50
5393.~9 0.42
b471.Q7 2,58
5550.36 0.37
562~.73 0.29
5707.12 0.6R
57~5.00 0.59
5P6~.51 0,4~
5947.~1 0.2g
§021.33 0,25
~178.35 0.26
o25~.54 0.51
6334.53 0.31
b412.~ 0.48
6480,62 1,64
b5~.~3 1,57
o7 tV. ~9 0.18
679~.P3 0.40
6R6~.22 0.67
694~.5R 0,00
7016,87 0.00
7042.13 0.00
PAGE
DATE OF SURVEY: 04-AUG-lO85
KELLY ~USHTNC ELFVATION: 82.00 MT
ENGTNFEP: (;. JOHNSON
MK~SIIR~D D~PTM
~ECTAM(;UhkR COORDINATES HORIZ, DEPARTURE
NORTH/SOUTH EA$~/WEST DI$T, AZIMUTH
FEET rEFT FEET
3841.24 ~; 4009.94 ~ 5552'90 N 46 13 E
3890,44 M 4071.11 ~ 5631.11 N 46 18 E
3939,53 ~ 4132,39 ~ 5709,34 N 46 22
39~8.~8 ~i 4194,15 E 5787,96 N 46 26 (
4037.78 ~ 4255,72 ~ 5866,4! N 46
4087,17 N ~316.75 E 5944~69 N 46
4136.87 ~: 4377.53 E 6023.00 N %6 37 E
4186.92 M 4438.17 R 6101.45 N 46 40 E
42~7.26 N 4498,43 R 6179,83 N 46 42 E
42~7.B7 N 4558.08 E 6257,95 N 46 44 E
4338,70 N 4617,26 ~ 6335,89 N 46 46 g
43~9,62 N 4676 17 ~ 6413,69 N 46 48 E
4440.13 ~.~ 4734~64 ~ 6490,88 N 46 50 E
44~8 44 M 4794,23 K 6567 40 N 46 53 ~
4534:39 N' 4854,99 F 6643:16 N 46 57 £
4579.37 ~i 491.6.44 ~ 6718.7R N %7 ~ E
4624,08 ~..; 4977.57 ~ 6793.99 N 47 6 E
466~.34 N 5038 64 g 6868.86 N 47 11 E
4712.24 ~.~ 5099:~8 E 6943,1~ N 47 !5 E
4755 97 K? 5159 77 E 7017,30 N 47 19 E
47701~4 N 5180~38 E 7042,53 N %7 21 E
ARCO, ~.L;~SFA, TNC.
F, tlp
N ¢lR'r H 5 f,On- r:, At..AF.- K A
~E A,5~IRr-D V ~q I~, m 1 .t" A T.,
hi:; P'i'N I.,~PTH.
O.f;O O.Of'
2006.00 1 g ~0. '..}~
3000. Ou ~5~I. 54 2454
400~.~0 ~.l 1 2.6Q
5000.00 ~'l. 1~ 3545
6flOn. Oo 420o.0~ ~! iR
700o. f~O ,I~;o6. b6 472~
8000.00 5~97.3! b3,i5
9n00. ~u A046. !6
10~00.(~0 a683.o5 6~01
10734.00 a.R.~9.27 6757
CAb DEVTATi(~a .1,7i'~'i]T~. 5%'Cq'IfIN SEYEP. ITY
,00 0 a " 0 O, F rt..n0 O.OO
.';7 14 17 t,,43 55 ? ~!.71 2.49
.59 37 2o ~ 45 17 E 49~.7! 3.2d
,~4 53 4a ~',43 12 w 12,13.n2 0.i7
.R9 ~6 1~ "~ 45 34 F 2061.74 0.07
,!7 ~0 12 ~ 47 45 W 29!9,02 0,'~
.02 53 Ja ~,~47 ~0 F 3737,na
-)
.~6 51 ~7 ~.. 45 4~ ~ 4531.66 0.,.7
,~ 51 ~? ~,~ 4e I~ ~ b3ZS.~7 0,50
.~6 ~1 53 ~ 50 ia E ~09o.ne 0,42
.95 48 3? 1',t .c;3 59 F, b86R.,'"2 0.67
.77 48 2! N r",4 1.1 F 7042.13 0.0~
PAGE
DATE DF SURVEY: 04-AUG-1985
KELLY BUSHING EI~EVATION:
ENGTNFER: G. JOHNSON
.4
82.00 FT
M .E'. AS U P i:jO DEPT
REC~AM(;i~L~R COORDTNATE8 HORIZ, DEPARTURE
NnRT}I/SOUTd EAST/WEST DIST, AZIMUTH
FLET FEET FEET DEG ~IN
45.81
338.B3
B~.43
1~70.23
?052.~?
9603.86
3149.25
368~,b4
4~6,97
0.00 F 0,00 N 0 0 E
41.80 E 62.0! N 42 22 E
356.56 E 491,88 N 46 27 E
878.95 E ~244,78 N 44 55 E
14~0,44 E 2065.28 N 44 36 E
2079 42 E 2922,02 N 45 22 g
o,
4668,34
4770,8~
}~ 5038,64 E 6868,86 N 47 11 E
~.' 5180.38 E 7042,53 N 47 21 E
C.O ~'iF':J'T A T J' "'~ ~
3C-P
KIJP~RII~
1 ~I,l, pRPO!,, 'n
DA ~F.:
DEPTt?
1090.z~7
1195.54
130?.no
14lO.p7
1521.ol
633748~37
1866.65
l~Sg.?3
2117. m,,.~
2251.~
2401. '~
2564.51
2737.O5
2R9q.q5
3413.40
399o.n0
3766.50
3944.38
4126.n3
4316.63
4'~11
4709. ~ 3
4909.9.7
51 lO.!b
5302. R3
5470.10
TpU.w, SiJR-,c;EA CnbR.jw
VIURTICA1', YE~TICAL DEVIATiF):~
PAGE
nAq'g OP SURVEY: 04-AUG-1985
K~iI, LY RUSHING ~5~VATION:
ENGINFER: G. JOHNSON
SUR-$EA DEFI'H
VEPTICAI, DOGLEG RFCTANG!!L~R
SMCTIn?I SEvEPiTY NORTH/NOUTH
FF,ET DE.~tlO0 FEET
O. q(.) 0,00 O.OO
q.O3 0.43 0.04
n.'O 0.~6 0.09
0.nO 0.50 0.;)1
O.n2 O.(,q 0.,)4
0.24 0.5t 0.03
~.!4 2.03 1.24
7.q~ 2.~2 5.57
P. O0 4.04 13. 'l 6
36.36 2.06 26.~3
43.49
62.58
84.44
109,25
136.98
167.i~2
202. '].2
239.72
28~,
334.25
82.00 ~T
5h~.34 2.5o 390.40
~7.30 3.20 454.90
7h~.O1 3.51 532.59
894.~5 0.48 626.2~
tO'zR.4'I 0,57 7~4,u4
I t b?. ~9 O.4~ 822.
~29R.O4 0.27 971.66
~435.g~ 0.85 1022 05
157~.~0 0.4a 1125:1~
1723.46 O.b~ !229.96
lf16R.59 1.04
201K.fi3 0.40
21~7.n6 1.63
232q.28 0,71
2496.47 0.88
266A.g7 0.61
2~40.33 0,49 .
3014.57 0,26
.31.7q.~0 4,34
3313.~3 0.40
1 334.07
3437,81
1,543,61
I 654,56
1 768.35
1.883,61
2000.03
22?8..".,7
CO0~£)IN~T£S HORIZ,, DEPARTURE
E~ST/WEST DIST, AZIMUTH
FEET FE~T,,: DE~ MIN
39.59 E 58.81 N 42 18 g
58.92 E 85.95 N 43 16 E
82.58 F 11.8,il a 44 21E
109.3~ E 154.56 N 45 1 E
140.2i E 196,02 N 45 39 E
176,3~ ~ 243.46 N 46 25 E
215 16 E 295 21 N 46 ~ E
257101 ~ 351:45 N 46~ E
3o2.oo ~ ll~.se ~ 16 45 s
351.94 E 485.~$ N 46 2S E
409.21 ~ 565.57 N 46 20 E
91b.76 ~ 1299.97 N 44 50{
1011.84 E 1438.20 N 44 42 ~
1110.6~ E 1580.95 N 44 37 E
1.211.60 F ~726.49 N 44 34 E
1313.15 E 1871.92 h 44 32 E
1417.45 E 2019.03 N 44 35 E
1526.09 E 2i70.64 N 44 40 E
164.4.49 E 2332.79 N 44 49 E
1.7~6 9q E 2499.86 N 44 58 E
1892~65 F 2670,22 N 45 8 E
2071.10 E 2843,41 N 45 18 g
~150.06 g 3017,50 N 45 26 E
~271.3! E 3~82,04 N 45 ]2 E
~370.22 E 3315.9~ a 45 37 £
']:P U~i Sd.~-SEA
MB~SURF;D VrP. TimAf, VEP'i'ICAL
n. EpTH D~,PTil D~ZPTH
5634.a7 3982,vn JaO0.O0
5¢101.83 .~(~2 On 4Oun,O0
596~.f3 4J~2~00 't100.00
6138.23 ~2R2.00 i~O0.O0
6~07.~2 4~2.t,~ ~30n.O0
6476.~ a4~2.00 4400.00
6638. ~5 ab~2.uO gqO0.00
679a.~6 40~2.0(, ~600. ¢,0
6960.33 ,~7~2.00 ~70o.00
7~21 .at 48~2.o0 qgOO.O0
C 0 .'.l p s F
DEV T .%m In,..:
DF.G :,l '!' ?i ,)FG
7984.!9 49,92.u0 :taun. ¢,0
7447.~7 ~;OR2.OO 5non.Po
7607.2{~ S182.0r~ ~lo0.no
7767.07 52~2.{~n S?uO,e0
7927,o~ 53~2,00
8~87.93 5492.UO
824~. n5 55a2. uO >qOn.
8410.40 5b~2.0n
8734,77
PAGE
DATE OF SURVEY: 04-AUG-lg85
KELf, Y RUSH/NC, ELEVATION: 92.00 FT
~NGINEEP: G, ,JOHNSON
SUB-SEA DEPTH
bEC~InN SEVERITY Nr]RTH/SOOTH
FFKT DE~t l O0 PEET
~44~.~1 0.2F~
3577.g~ 0.24
3712.63 0.57
3~:4~.~7 0.30
3aB5.33 0.26
41Zl.72 3.22
~qP.33 0.26
437~.?1 0.3~
~5un.52 O. 13
~62",34 0,31
~755.63 0.24
4R~3.&O 2,00
5008.57 0,69
J133.23 0.45
525~.15 0.~7
5384.~2 0.33
b5]0.30 2.12
563&.~7 0.3~
57~4.19 0.55
~01~.~5 0.27
O14~.44
627J.,19 0.~5
0395,~t~ 0.93
6517.11 1.58
6635.06 1,16
~7b~.58 0,30
~66.14 0.80
~97~.~0 0.00
70g~.13 0.00
2407.08
2587.45
2678.80
2771.90
28a5.51
2952.b2
3039.54
3127,b2
321b,i5
COORDINATES NORIZ, DEPARTURE
EAST/WEST DIST,, AZIMUTH
FL~T PEE~', DEG ~IN
2665,97 E 3715i '
27~6.38 E 3850, '
31~9.14 E 4376,75 N 46 0 .
3239.~9 E 450~,14 N 46 0 E
3330,74 E 4630.06 N 46 0 E
3305.77
3396,O~
3481,95
3565,5g
3648.~1
37~2.~0
3835.95
38q5 54
39752~5
4054.90
3a21.~6 ~ 4757.86 N 45 59 E
3513.5] ~ 4886,55 N 45 58 E
3604.40 F 5011,55 N 45 59 E
3696.83 ~ 5136.14 N 46 2 E
37g0.18 E 5260 97 N 46 5 E
3884.06 ~ 5386:86 N 46 8 E
3978.81E 5512.93 N 46 11 E
4077.47 E 5639,23 N 46 18 E
4~77.~ E 57~6.29 N 46 ~5 E
4277.00 F 5893.63 N 46 3! E
4134.~
4216,]3
4297.J5
4378,58
4457°7¢'
4,530 lP
4599 ~2
4667 it
4733 15
4770 84
4375.22 E 6020.02 S 46 37 E
4473.17 E 6146,95 N ~6 41 E
4569.13 F 6272,49 N 46 45 E
4663.48 $ 6396,88 N 46 48 E
4755,8t ~ 65~8.34 N 46 51E
48~9.26 K 6~36.10 N 46 56 ~
4943.73 E 6752.t~ N 47 3(
5036.95 ~ 6866.78 N 47 10 ,.
51~8.15 E 6978,58 N 47 17 E
51~0,38 $ 7042.5~ a 47 21E
'~APi<w,R
~OP
bASF
TOP
BASH'
U
Dr')~FR
SA~D
3-SEP-R5
PAGE
DATE O~ SUPVFY: 04-AUG-1985
ENG]NFED: G. JOHNSON
.7
82. O0 FT
522' FNI,,
SUB-SEA
6378.82
6439.7~
A531.~?
6og2.8~
6757.27
1013'
SURFACE LOCATION
RF, C GUbAR COORDIN
NORTH/~OUTH ~-~$T/WEST
4557.77 N 4~7.0! E
4620.~7 N 4973.28 E
4728.42 N 5121.60
4770.84 N 5180.]8
U~
PAGE
RUSHING F. hEVATION:
EHGINF. EP: G. JONNSON
82.00 FT
:]I:;'£CI.~}= .522' FNL,
!,.~,:T.,~w F~. r':'O"- k'~ SUB-SEA
SU
1013'
RECTA
NORT
RFAC£ LOCATION
AT
SEC 14, TI2N, Rgb, UM
NGULAR · COORDINAT£,S
H/SOUTH EAJ~?/W£ST
TI~P U r'F r'l~
Tn
~55
462
~72
~77
5.34 N 4829.3~ E
7.77 N 48~7.01
0.97 N 4973.~8
~.42 N 5121.60 E(
n.84 N 5180.38 E
FIe!AY,
TV't.,F St
,v~FAF UF'EP V FRq" j ~AT. Vi..'RTT C ~. b
DEPTI.] DFt"TH
7nq?.~j ~ ~7 2! ~
SCHLUMBERGER
D I RECT Ii ONAL SURVEY
COMPANY ARCO ALASKA INC
WELL 3C-8
FIELD KUPARUK
COUNTRY USA
RUN ONE
DATE LOOOEO 04-AU0-1985
REFERENCE 0000?0?80
WELL NAME: 3C-8
SURFACE LOCATION:
522' FNL, 1013' FEL, S14, T12N, R9E, UM
VERTICAL PROJECTION
-40O0 -20OO 0 0
i2000
47,
WELL NAME: 3C-8
SURFACE LOCATION: 522' FNL, 1013' FEL, S14, T12N, R9E, UM
HORIZONTAL PROJECTION
$000 I~F 0000'70?80
SO00
4OOO
~000
~000
I000
-1000
-~000
-lO00
WEST
~C;G~.E = 1/IOOD IN/FT
0 1000 2000 9000 4000 6000 6000 VO00
E~T
Suggested form to be inserted in each "Active" well folder to check
for t-,mely compliance with our regulations.
OPERATOR, WEL~ NAblE AND NUMBER
Reports and Materials to be received by: ~:2:~--~_~
Date
Required Date Received Remarks
Completion Report
.,_~ #~' ~'- :~ ~_.~ -
,
.
Samples
Core Chips ,~
Registered Survey Plat
Inclination Survey
Directional Survey :/~ '
Drill Stem Test Reports
Production Test Reports
RETURN TO:
ARCO Alaska, Inc.
Post Offic _..,100360
Anchorage.~laska 99510-0360
Telephone 907 276 1215
ARCO ALASKA, INC.
KUPARUK OPERATIONS
RECORDS CLERK
ATO-1115B
P.O. BOX 100360
ANCHORAGE, AK 99510
DATE: 09-05-85
TRANSMITTAL NO:5332A
**CONTINUATION
ENGINEERING
TRANSMITTED
RECEIPT AND
SEQUENCE OF
2G-9 ~"- PBU
2G-9~ PBU
2G-11-"~ PBU
2G-16 JSB~ip
HERL%~ITH ARE THE
RETUR1] ONE SIGNED
EVENTS FR~ WELL
2h-1 -~ PBU
2h-l-" PBU
2U-l'~ 'C' SAND PBU
2U-1''~ END 'C' SAND PBU
2W-7 J 'C' SA~qD PBU
2W-7/ 'C' SAND PBU
2W-7/~ 'C' S~qD PSU
2X-11 ~' PBU
2X-ll 'C' SAND PBU
2X-ll/ 'C' SAND PBU
3C-5 --' BhP & M1SC.
3C-7-~ BHP & MISC.
3C-8 / BHP & MISC.
3C-9/" BHP & MISC.
3C-10 /'BHP & MISC.
FOLLOWING ITEMS. PLEASE ACKNOWLEDGE
COPY OF THIS TRANSMITTAL.
SERVICE ~EPORTS/PRESSURE DATA
08-22-85
08-21-85
08-19-85
08-19-85
08-25-85
08-24-85
08-23-85
MISC. 08-24-85
08-17-85
08-23-85
08-22-85
08-24-85
08-25-85
08-26-85
08-29-85
08-30-85
08-31-85
08-09-85
08-10-85
K U PARU K
3C-12/
3C-10.~
3C-9 /
2Z-16-'
2Z-15
2Z-14-'
2Z-'13~
2X-4/
2X-4"
2U_l''~
2A_13'~'
iR-10
1R-9 /'
WELL PRESSURE REPORT
STATIC 'A' SAND
STATIC 'A' SAND
STATIC 'A' SAND
STATIC
STATIC
STATIC
PBU
PBU
STATIC
STATIC
STATIC
'A' SAND
'A' SAND
'A'
'a'
SAND
SAND
ENVELOPE FACES
07-24-85
08-10-85
08-09-85
07-21-85
07-17-85
07-20-85
07-17-85
08-12-85
08-13-85
08-24-85
08-25-85
U8-15-85
0~-14-85
CAMC 0
OTIS
OTIS
OTIS
OTIS
OTIS
OTIS
CAMCO
CAMCO
OTIS
CAMCO
CAMCO
CAMCO
RECEIPT ACKNO~LEDGED:
nPAE*
B. CURRIER
CHEVRON*
'% & M*
DISTRIDUTION:
DRILLING W. PAS~ER
L. JOHNSTON EXXON
MOBIL* PHILLIPS OIL*
NSK CLERK J. RATMMELL*
· } .
· ~. ~ 5" ~-
-,~ ~: ~',-~-.
SOHIO*
UNION*
K. TULIN/VAULT
ARCO Alaska. Inc. is a Subsidiary of AtlanticRichfieldCompany
ARCO Alaska, Inc
Post O Iii c e 't.,,,~'~:i 00360
Anchorago. Alaska 99510-0360
Telephone 907 276 1215
DATE: 08-30-85
TRANSMITTAL NO: 5317
RETURN TO:
ARCO ALAbKA, INC.
KUPAI',UK OPERATIONS ENGINEERING.
RECUKDS CLEKK
~TO- 11
P.O. SOX 100360
ANCtIOkAGE, AK 99510
THANSMITTED IIEkE%{I'£[j AHE Till FOLLOWING
t<ECEIPT AND KETU~ ONE SIGNED COPY OF T
HOLE LIS TAPES AND ~ISTING/SCHL/ON
2Z-9 08-11-85 ~UN #1 3487.0-7357.
2~-10 08-04-85 I<UN #1 3790.0-7~66.
3~-S 07-23-85 ~{UN ~1 5184.0-10065
11t-16 08-19-85 RUN #1 4062.5-8463.
1R-15 08-12-85 RUN #1 3788.0-7442.
1R-14 08-06-85 HUN ~i2 4602.0-915~.
2A-16 08-18-85 RUN ~1 8979.0-9789.
2A-14 -07-28-85 RUN #1 7170.5-7871.
2^-15 0~-0~-85 I~UN #1 7420.0-8142.
ITEMS. PLEASE ACKNOWLEDGE
HIS TRANSMITTAL. -
U COPY OF EACH
0' REF # 70730
0 REF ~ 70712
.5 REF # 70683
5 REF # 70754
5 REF # 70738
0 REF ~ 70726 '
5 REF # 70753
5 R£F # 70705
0 REF # 70731
RECEIPT ACKNOWLEDGED:
DISTRIBUTION:
BPAE DRILLING W. PAStiER
B. CURRIER L. JOIzNSTON EXXON
CHEVRON [,,OB1 L PilILLIPS OIL
b & l,] NSK CLE/~K J. RATIIHELL
At]Cfi Ala~k,~ I.c i~ ;~ R.b$icliarv ol Allanlict~,r'l,l.: ' ' ·
ARCO Alaska, Inc.
Post Office B(~,......0360
Anchorage, Alaska 99510
Telephone 907 276 1215
August 14, 1985
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: State Reports
Dear Mr. Chatterton:
Enclosed are the July monthly reports for the following wells:
2A-13 3C-10 2Z-11 WSP-20 11-11
2A-14 1R-10 2Z-12 9-31 12-3 (workover)
3B-12 1R-11 2Z-13 9-32 12-5 (workover)
3C-8 1R-12 2Z-WS#1 9-33 14-3 (workover)
3C-9 1R-13 WSP-9 (2) 11-10 14-5 (workover)
L1-14
L2-20
If you have any questions, please call me at 263-4944.
Sincerely,
Gruber
Associate Engineer
JG/tw
GRU10/L120
Enclosures
RECEIVED
! ]985
Alaska Oil & Gas Cons. Commission
Anchorage
ARCO Alaska, Inc. is a Subsidiary of AtlanlicRichfieldCompany
STATE OF ALASKA
ALASKA O-~ AND GAS CONSERVATION COi~.~411SSION
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
I. Drilling wel~(~
Workover operation []
2. Name of operator
ARCO Alaska, Inc.
; 7. Permit No.
85-155
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 029-21390
522' FNL, 1013' FEL, Sec.14, T12N, RgE, UM
4. Location of Well
at surface
6. Lease Designation and Serial No.
ADL 25629 ALK 2562
5. Elevation in feet (indicate KB, DF, etc.)
82' RKB
9. Unit or Lease Name
Kuparuk River Unit
10. Well No.
3C-8
11. Field and Pool
Kuparuk River Field
Kuparuk River 0il Pool
For the Month of. July ,19 85
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Spudded w~ll ~ 0600 hfs, 07/13/85. Drld 12-1/4" hole to 5225'. Ran logs. Ran, cmtd, & tstd 9-5/8" csg. Drld
8-'1/2" hole to 10,234'TD (7/23/85). Ran, cmtd, & tstd 7" csg. PBTD = 10,137'. Secured well & RR @ 2130 hfs,
7/24/85.
13. Casing or liner ryn and quantities of cement, results of pressure tests
16", 62.5#/ft, H-40 weld conductor set @ 116'. Cmtd w/213 sx CS II.
9-5/8", 36.0#/ft, J-55, BTC csg w/shoe @ 5206'. Cmtd w/1580 sx AS III & 340 sx Class G.
7", 26.0#/ft, J-55, BTC csg w/shoe @ 10,219'. Cmtd w/450 sx Class "G".
14. Coring resume and brief description
None
15. Logs run and depth where run
FDC/CNL/GR f/10,033' - 9500' & 6275' - 5208'
DIL/SFL/SP/GR f/10,033' - 5206' & f/5160' - surface
6. DST data, perforating data, shows of H2S, miscellaneous data
None
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
NOTE--Repo on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 DRH/MR08
Submit in duplicate
:~:.=-~-~E I~OTE:--BL--" BLUt:LII~, S - SEPIA, ~F - FTTM, T - TA.~E, MC- PEOTOC01~
~ d 2~: / ~7-s-,:,/, e ,e -/z/aa -
1LECE!?T ACKNO~,~LEDG'ZD: '
PLEASE R.ET~ RECEIPT TO: 0 A-LAS'~, ~2'~C. ' 'l;~::.~a 0il & Gas Cons. Commission
/_./ ATTN: PATSY $. BAXTE"i~ ATO/507 Anchorage
P. O. BOX 100360
AN~ORAGE, AX 99.510
MEMORANOUM
TO:
THRU:
FROM:
State of Alaska
Chair _~
Lonnie C. Smith
Commissioner
Edgar W. Sipple,
Petroleum Inspector
DATE: July 23, 1985
FILE NO: D. EWS. 52
TELEPHONE NO:
/~ SUBJECT: BOPE Test
Arco's Kuparuk 3 C-8
Permit No. 85-155,
Kuparuk River Field
Thursday, July 18, 1985: I traveled this date from Arco' s Kuparuk
1R-12 (subject of another report) to Arco's Kuparuk 3C-8, Parker
Rig 191, to witness a BOPE test. The drilling contractor was in
the process of Nippling UP.
The BOPE test commenced at 12:30 A2,:[ and was concluded at 2:15 AI~! .
There were no failures.
I filled out the AOGCC BOPE inspection report which is attached to
this report.
In summary, I witnessed the BOPE test on Arco's Kuparuk 3C-8,
Parker Rig 191.
Attachment
02-00IA(Rev. 10/79)
O&G
5/84
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION COMMISSION
B.O.P.E. Inspection Report
Inspector
Operator
Location: Soc/~ ,
Drillin8 Contractor
Location, General ~
General Housekeeping ~, Rig
Reserve Pit
Mud Systems Visual
,T i~N R~ ~& M
Well Sign
Trip Tank
Pit Gauge
Flow Monitor'
Gas Detectors
Audio
BOPE Stack
Jn~n~,~ a r Preventer~ ~%
Pipe Rams ~
Blind Rjlms
Choke Line Valves dP ~i
H.C.R. Valve D~
Kill Line Valves ~ ~
Check Valve
Test Results: Failures
F
Test Pressure
Representative ~- ~C~-4~O."w'
Permit ~! ~-/SS
f~/~ Casing Set
Representative
ACCUMULATOR SYSTEM
Full Charge Pressure
Pressure After Closure
Pump incr. clos. pres. 200 psig
pSig ~OgPO
psig I Z-/ _5'tD
~ min ~q sec.
Full Chaxge Prgssure_Attained: ~3 min ~O sec.
N2'?~ ~.~ :.z,,o,,i a~r~
psig
Controls: Master ~//, t ' (ot!c
Remote ~J Blinds switch cover O
Kelly and Floor Safety Valves
Upper Kelly~)~f~est Pressure
Lower Kelly D~,~'~est Pressure
Ball Type ~/~ ~"fest Pressure
Inside BOP~-_ &'~est Pressure
Repair or Replacement of failed equipment to-be made within
Commission office notified.
Remarks: ~(Cu~/~]~W~ ~,,l,l~.l~ y.$'j [Z~a~.~
Choke Manifold O~%est Pressure ~oO
No. flanges 3~
Adjustable Chokes ~ //v4~
Hydrauically operated choke I~t~..
~ Test Time / hrs. y~,~% ~/
days and Inspector/
Distribution
orig. - AO&GCC
cc - Operator
cc - Supervisor
July 5, 1985
Mr. J. B. Kewin
Area Drilling Engineer
ARCO Alaska, Inc.
P. O. Box 100360
Anchorage, Alaska 99510-0360
Re: Kuparuk River Unit 3C-8
ARCO Alaska, Inc.
Permit No. 85-155
·
Sur. Loc. 522'FNL, 1013'FEL, Sec. 14, T12N, RgE, I~.
Btmhole LOc. 1070'FNL, 1043'FEL, Sec. 12, T12N, RgE, UM.
Dear Mr. Kewin:
Enclosed is the approved application for permit to drill the
above referenced well.
If coring is conducted, a brief description of each core and a
one cubic inch size chip from each foot of recovered core is
required. Samples of drill cuttings and a mud log are not
required. A continuous directional survey is required as per
20 AAC 25.050(b)(5). If available, a tape containing the
digitized log information shall be submitted on all logs for
copying except experimental logs, velocity surveys and dipmeter
surveys.
Many rivers in Alaska and their drainage systems have been
classified as important for the spawning or migration of
anadromous fish. Operations in these areas are subject to
AS 16.05.870 and the regulations promulgated thereunder (Title 5,
Alaska Administrative Code). Prior to commencing operations you
may be contacted by the Habitat Coordinator's Office, Department
of Fish and Game.
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Article 7 and the regulations promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter 70) and by the
Federal Water Pollution Control Act, as amended. Prior to
commencing operations you may be contacted by a representative of
the Department of Environmental Conservation.
Mr. Jeffrey B. Kewin
Kuparuk River Unit 3C-8
-2- '-~ July 5, 1985
To aid us in scheduling field work, please notify this office 24
hours prior to commencing installation of the blowout prevention
equipment so that a representative of the Commission may be
present to witness testing of the equipment before the surface
casing shoe is drilled. I~here a diverter system is required,
please also notify this office 24 hours prior to commencing
equipment installation so that the Commission may witness testing
before drilling below the shoe of the conductor pipe.
In the event of suspension or abandonment, please give this
office adequate advance notification so that we may have a
witness present.
VerM truly yp~rs, ~
C. V. Chattert:on
Cha±rman of
Alaska Oil and Gas Conservation Comm±ssion
BY ORDER OF THE COMR~ISSION
be
Enclosure
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o enct.
Mr. Doug L. Lowery
ARCO Alaska, Inc.
Post Office Bo-,~J00360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
June 28, 1985
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: Kuparuk 3C-8
Dear Mr. Chatterton:
Enclosed are:
An application for Permit to Drill Kuparuk 3C-8, along
a $100 application fee
Diagrams showing the proposed horizontal and vertical
projections of the wellbore
wi th
o A proximity plot
o A diagram and description of the surface hole diverter
system
o A diagram and description of the BOP equipment
We estimate spudding this Well on July 16, 1985. If you have any
questions, please call me at 263-4970.
Sincerely,
Area uril ling Engineer
JBK/LWK/tw
PD/L117
Enclosures
RECEIVED
jUL 0 1 1~B5
Alask~ 0il & Gas ConS, commission
Anchorage
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
STATE OF ALASKA
ALASKA Crc AND GAS CONSERVATION COf~rCYllSSlON
PERMIT TO DRILL
20 AAC 25.005
la. Type of work.
DRILL E~X
REDRILL []
DEEPEN []
lb. Type of well
EXPLORATORY []
DEVELOPMENT OIL
DEVELOPMENT GAS []
SERVICE []
STRATIGRAPH
SINGLE ZONE [~]X
MULTIPLE ZONE
2. Name of operator
ARCO Alaska, Inc.
3. Address
P. 0. Box 100360, Anchorage, Alaska 99510
4. Location of well at surface
522' FNL, 1013' FEL, Sec.1/+, T12N, RgE, UPI
At top of proposed producing interval
138/+' FNL, 1391' FEL, Sec.12, T12N, RgE, UPI
At total depth
1070' FNL, 1043' FEL, Sec.12, T12N, R9E, UPI
5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no.
RKB 82', PAD 47' ADL 25629 ALK 2562
9. Unit or lease name
Kuparuk River Unit
10. Well number
3C-8
11. Field and pool
Kuparuk River Field
Kuparuk River 0il Pool
12. Bond information (see 20AAC25.025) Federal Insurance Company
Type Statewide Surety and/or number #8088-26-27 Amount $500,000
13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed
30 mi, NW of Deadhorse miles 522 feet 3C-6 well 120' @ surface feet
16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date
10192' MD, 6823' TVD fe~t 2560 07/16/85
19. If deviated (see 20AAC25.050) 120' Anticipated pressures 3005 psig@ ~0°F Surface
KICK OFF POINT 500 feet. MAXIMUM HOLE ANGLE 52 ° l (see 20 AAC 25.035 (c) (2) 34~0 psig@ 670_? ft. TD (TVD)
21
Proposed Casing, Liner and Cementing Program
SETTING DEPTH OUANTITY OF CEMENT
SIZE
i Hole Casing
24" 16"
12-1/4"I 9-5/8"
8-1/2" ] 7"
Weight
62.5#
36.0#
26.0#
22. Describe proposed program:
CASING AND LINER
Grade I couplingl
H-40 / Weldl
"55/HF-EIW BTCI
1-55/HF-E~_ BTCI
Length
MD TOP TVD
80' 36' I 36'
I
5099' 36'I 36'
10110'
I
35' I 35'
MD BOTTOM TVD
1161 116'
51351 3762'
I
10192~ 6823'
I
I
(include stage data)
+ 200 cf
1580 sx Arctic Set III &
340 sx Class G blend
300 sx Class G blend
ARCO Alaska, Inc., proposes to drill a Kuparuk River Field development well to approximately 10,192' MD (6823'
TVD). Selected intervals will be logged. A 20", 2000 psi annular diverter will be installed on the'ld"
conductor while drilling the surface hole. The 13-5/8", 5000 psi, RSRRA BOP stack will be installed on the
9-5/8" surface casing. The stack and related equipment will be tested to 3000 psig upon installation and weekly
thereafter. Expected maximum surface pressure is 3005 psi. Pressure calculations are based on virgin reservoir
pressure. Surface pressure is calculated with an unexpanded gas bubble at surface; including temperature
effects. Casing will be tested to 3000 psi prior to releasing the drilling rig. Non-freezing fluids will be
left in uncemented annuli through the permafrost interval. 3C-8 will be 120' away from 3C-6 at surface. There
are no closer wellbores anywhere downhole. Reserve pit fluids will be disposed of by pumping them down the 7" x
9-5/8" annulus of this well. The 7" x 9-5/8" annulus will be left with a non-freezing fluid during any
interruptions in the disposal process. (continued on attached sheet)
23. I hereby ~f~hat the foregoing is true and correct to the best of my knowledge
SIGNED / L(~C~/ ' //J-~"' --. TITLE
T h e sp ace ~J~'/w'f q~,~m/r~sS,o n u se 7w
Area Dril 1 ing Engineer DATE
CONDITIONS OF APPROVAL
Directional Survey required APl number
~L~ E S I--INO
SEE COVER LETTER FOR OTHER REQUIREMENTS
Samples required ! Mud Icg required
[-]YES [~NO []YES
Permit number ,~ .~_ ,.. ,-- I Approval date
APPROVED BY
Form 10-401
,COMM I SS I O N ER DATE
by order of the Commission
July 5, 1985
Submit in triplicate
PERMIT TO DRILL
3C-8 cont'd
Upon completion of the disposal process, the 9-5/8" x 7" annulus will be sealed with a minimum of 200 sx cement
followed by Arctic Pack. The well will be completed by the workover rig using 3-1/2" or 2-7/8" tubing.
Selected intervals will be perforated within the Kuparuk formation and reported on subsequent reports. A
subsurface safety valve will be installed and tested upon conclusion of the job. After the workover rig has
moved off location, this well will be fracture stimulated.
RECEIVED
J U L 0 1 !985
Alaska Oil & Gas Cons. rdo~mnissJon
Anchorage
-ARCO ALASKA.'" INC. ...... ,~ '
PAD 3C. t4ELL NO, 8 F,.__~POSED
KUPARUK FIELD, NORTH STL-OPE~ ALASKA ~-~
:
EASTIgAN t~HIPSTOCK, INC.
:... 1000.
2000_
_'C'_ .... 3ooo.
m
~ . 4000_
.5000 _
_- 6000_
7000·
SURFACE
KOP TVD-"500 TtlD-500 DEP-O
' 1 5 ..... BU!LD 3 DEG
PER 100 Fr
_
21
22'
3~39" BASE PERHAFROST TVD-170g TI1D-I 809 DEP-431
st EOC TVD-2020 TIED-2258 DEP-754
TOP 14 SAK SNDS TVD-3307 TMD-4384 DEP=2446
· :
TOP UGNU SNDS TVD-2592 TMD"3203 DEP-1506
. _
K-12 TVD=3562 TMD-4805 DEP-2781
CSG PT TVD=3762 TtlD=5135 DEP=3044
AVERAGE ANGLE
52 DEG 44 FIIN
.... TARGET_CNl'R'--;TVD=6539 TPID=g722 DEP=6695
000
K-5 .TvD=5732 TI'ID=83:g' DE
TOP UPPR SNDS. 'TV~)'6466'TI'ID-9602 DEP"6599 - ~
TOP LO14R SNDS TVD=6582 -TMD=g?g3 DEP=6751
BASE KUP SNDS 'TVD-6?02 TMD=ggg2 DEP=6909
TD ·(LOGGING PT)I TVD-6823' TMD=IOtg2 DEP=7068
I I I I I
:'-VERTICAL SECT]ON RECEi
VED
· .
·
.,
J U L 0 ~. 1985
_
Alaska Oil & Gas Cons. Commission
Anchorage
?000
._~_~ - ............... HOR ~ ?ONTAL ..... PROJ~TION_
... $000,.
4000 -
3000
2000 .
b~,~,'~LE1 'IN.. =. 1000 FEET
_
:
ARCO ALASKA; INC. ' .............
KUPAR K FIELD '
EASTMAN WHIPSTOCK. INC.
-WEST-EAST
2000 :3000
4000 5000 6000
lO00 0 lO00
I I
TAROET OF. JITER
TVDm6539
TAROET LOCATIO#t TMD=9722
1320' FNL. 1320' FEL , DFP'669~
SEC. 12. Tt2N. RI;Hi
· NORTH 4.482
EAST 497:3 m
SURFACE LOCATION,
522' F#L. 1013' FEL '
SEC. 14., Tt2N. R9E
_._ 1 ooo ........................... i ..................... '... .................. : ......... ,----~ ...... J_'d_L._O
N. 47 D EG 58 i'1! N
F-Alaska Oi! & Gas Cons. Commission
6695' (T 0 ~T AR GE T) ' Anchorage - ~ -
· ":1 300
4'00 -
..
· .
300.
200 .-
'l 200' !l i O0 :l 000 900
, .-,:. ',..._.i .... ~ .. "ARCO ALASKA' INC.
,-. -
........ : .... ~ ..... " ......... PAD' 3C,'-I/ELL -NO~ 5-7-8
· ' · ; 1890
-.
·
800
!
s~ .............. ~OTE~
-.
. .
PROPOSED
KUPARUK FIELD. NORTH SLOPE. ALASKA
EASTMAN -WHI.P$~OCK. . INC. - '
_
~/ELL' pATHS EXTEND BEYOND
THIS VIEWING WINDOW
7OO
6OO
' , ·, : ~ - ~ /J ~ose
.... ~ ' ' --i t' 15;21' : : ~ / ' '
.. l/'~.~s~,. · _ .. . . .! ; !i~?~ : . .
\,,',,:1'"' ' /'~ ' '
-" ~ '~ ....... .---~ .............. ~ ' -- ~"-~ ...... : ................. ' .... 1"'"' ............ '
._200 ........... ~ ..... , ......... --~re---' .... ~--: ........ ~--'--1741-'--' : ' -
'~oo_ _._' ..... ""5:'.'~ ...... / .... ~'"' '
' ,, ' ~ · 7~- ,/ ~2r~ _
':"' ' : -"/? _/'~' _ RECEI, VED _
....... '."' ...... ~-~': ..... ~-'-": ': ---~'- ~'./ '-: - ~ULO;
5oo .......... '. ~ ..... :'-~- --~.; ..~- ............................. : .........
...... ' / ~0' . Alaska Oil '& Gas Cons. Commission
' . ~ ' . ,oho,
.... ~ . } . ~OJ . -
.
..
-- . .
..
..
· _
.
.... .
·
·
. .
..
..
-.
· .-.-. -' RECEIVED
Alaska Oii& Gas Cons. Commission
Anchorage
5
4
3
:
.>
/
i. 16" - 2COP -'~! TAN(CD START,TNI~ I-EAD
~ 11 · - ~ '! C.,ASZNG I-F, AD
~. 11' - 30DO,....,.~!× ID-'5/8' --
,4. 13.-5/8' - 5000 IDS! PIPE
5. 1,3~5/8' - ~ PS! i::RZLLZN:~ ~ W/'CHC]~-AND
KZLL LZ hF_.S
'7. 1Z~5/8' - 5000 PS! AN'¢.LAR'
ACI1A,t~ATOR - CApAC~[TY T~$'i'
I~ -O-ECX AND FZLL ACC1.F4.LATC~ ~0IR .'TO ~
LEVEL WITH HYDRAU_IC FLUID.
P__. ASSLJ:~ THAT AC3CI__M,.LATC~ ~ IS ~ PSI
OB~ TZNF_, 'T~ O_~ ALL LIMITS
ALL LIMITS A~ Q..CE~ WITH CHA~Ih~ PulVP CFF.
4. RE(I:RD (iN NAI:X::: RE:PC:~o TI-F_ ACCE:FTASLE LONt~ L/MIT
]:S 45 ,.~.(IN:~ O.~ZN~ TIA~. AND 12DO PSZ RE:WAININ~
e
,.
I0.
~1.
. .
14.
13--5/8" SI'ACK TE I'
FILL BCP 5'TACX AhD C~ 'MAhEF~ ~rITH ~C
DIESEL.
OEO< THA'T ALL LDO< DO~W ~ IN t~im i 6EAD
FULLY R~FRACT~D. ~Ag' ~ P~.LIG IN ~ I 6EAD
~rITH ~LIXNING JT AND RLI'J IN L~
LIhE VALV?,.~ ADJAODVT 'FO SO~ ~9'AO<. ALL
-P~SSU~ UP TO 75O PS~ 8~Q HOLD Fm ~0 ~.
~ ~ 'r0-'~O00-~ PS~ AhD HOLD FO~ ~0
~ m:-n ~ T00~-:-.~.
LIhE VALVE~. CI.O~E TOP PIPE RAN~ AND NCR VALVE~
ON KILL AND O-KXE LII~,_.~ '
-WITH A-250 PS! LC~ AND~~PS~> HIGH. TEST_AS ~N
NDT A. FU_L Q._OSIN3 POSITIVE SEAL O-tOKE. CI,4..Y
TErn' Bcrn'C~ PIPE ~ TO 250 PSI ~ 303O PSI.
PSI. -
FLUID. ~ ALL VALVE~ ~N ~LLIh~ PO~ITIOxL
'FEDT;b'TANDPIPE YALVE~, K~;~¥, KELLY 000<$, D~ILL
FO~ $I0hL AhD SD~D TO DRILL~h~S SU:'ERV~Sm.
W~Y ~ FU~:IONALLY O::~TE BO:'F. DAILY,
RECE VED
J U L 0 i 1985
.
Alaska Oil & Gas Cons. Gommissi°n
_
· /":'"J .... ~6 510084~ I REV. 2
MAY 15, I~E
ARCO Alaska, Inc.
Post Office'r"~"~x 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
~iay 20, 1985
Mrs. Elaine Johnson
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: Conductor As-Built Location Plat - 3C Pad
Wells 1-16
Dear Elaine'
Enclosed is an as-built location plat for the subject wells.
you have any questions, please call me at 263-4944.
Sincerely,
Gruber
Associate Engineer
JG/tw
GRU6/L113
Enclosure
If
ARCO Alaska, Inc. is a Subsidiary ol AtlanticRichtieldCompany
N O Fi T H
SEC. II
SEC. 14
pi{ILL SITE $-C
AS- BUILT CONDUCTOR LOCATIONS
WITHIN SECTION 14, TI2N, 'R9E, U.M., ALASKA
NOTE:
COORDINATES ARE ALASKA STATE PLANE ZONE 4.
SECTION LINE DISTANCES ARE TRUE.
HORIZONTAL POSITION PER LHD B ASSOC. MONUMENTS 19-1 8 19-2.
VERTICAL POSITION PER LHD 6 ASSOC. TBM 0PI6, 8 DOC. 125.
eWELL NO. 6 INFORMATION PER DWG. NO. NSK 9.05.$03dl.
;.
'---/ Y = 5,995,835. 1 5
WELL I x= 528,205.68
596"FNL, 1366'FEL
Lot. = 70023'58.955''
Long.= 149°46' 13.622"
Y = 5,995,893.73
WELL 2 x-- 528,~93.~4
557' FNL, 1378'FEL
Lat.-' 70023'59.532"
Long. = 149°46' 15.983'
Y = 5,995,952.45
WELL 3 x= 528,~80.60
478'FNL, 1390'FEL
Lot. = 70024'00. II0"
Long. = 149046' 14. :343"
¥ = 5,996, 011.07
WELL 4 x-- 528,~88.~2
420' FNL, 1402'FEL
Lot. = 70°24'00.687'
Long.= 149°46' 14.703"
Y = 5,996,086.35
WELL 5 x= 528,520.~6
346' FNL, 1050'FEL
Lot. = 70°24'01.414"
Long.= 149046'04.380"
Y = 5,996,027. 76
WELL 6' x= 528,532.83
404' FNL, 1038'FEL
Lot. = 70°24'00.837
Long.= 149°46'04.015
Y= 5,995,969.11 Lot. =
WELL 7 x==528,545.24 Long.=
463'FNL , 1025' FEL
70024'00.260"
149046' 03.658"
Y= 5,995,910.44 Lot. =
WELL 8 x= 528,557.7~ Lo,g.=
522'FNL , 1013' FEL
70023' 59.683"
149°46' 03.299"
Y= 5,995,372.49 Lat. =
WELL 9 x, 5.28,672.61 Long.=
1060'FNL ~ 901' FEL
70o23'54.387"
149°45'59.993''
Y= 5,995,$14.06 Lat. =
WELL 10 x=528,685.04 Long.=
1119'FNL , 889' FEL
700 23' 53.812"
149o45'59.636"
Y: 5,995,255.22 Lot. : 70023'53.233"
WELL '11 x= 528,697.61 Long.= 149°45'59.274"
1177'FNL, 876'FEL
Y = 5,995, 196.51
WELL 12 x= 528,?~0.~9
1236'FNL, 864' FEL
Lat. = 70023'52.655"
Long.== 149°45'58.912"
Y = 5,995,121.33
WELL 13 x= 528,358.~0
1310' FNL ~ 1217' FEL
Lat. = 70°23'51.929"
Long. = 149046'09.235-
Y = 5,995, 180.01
WELL 14 x= 528,345.63
1251'FNL, 1229' FEL
Lot = 70023'52.506"
Long.= 149°46'09.594"
Y = 5,995,238.66
WELL 15 x= 528,333.07
1193'FNL, 1241'FEL
Lot. = 70O23'53.084"
Long. = 149°46'09.956"
Y = 5,995,297.32
WELL 16 x= 528,320.55
1134' FNL, 1253' FEL
Lot. = 70°23'53.66l"
Long.= 149046' 10.316"
CERTIFICATE OF SURVEYOR :
~.~ SURVEYED FOR:
.. DATE MAY 14, 1985
DRAWN J. DAV{S
~ 8SSg0! FIELD BOOK 8501
I HEREBY CERTIFY THAT I AM PROPERLY
REGISTERED AND LICENSED TO PRACTICE LAND
SURVEYING IN THE STATE OF ALASKA AND THAT
THIS PLAT REPRESENTS A LOCATION SURVEY
MADE BY ME OR UNDER MY SUPERVISION, AND
THAT ALL DIMENSIONS AND OTHER DETAILS ' '
ARE CORRECT. ~. -'__. :" ,: "~1~.
114441II ~dl ;mil iillflllllI
3340 Arctic Boulevard, Suite 201, Anchorage, Alaska 99503
ARCO Alaska, Inc. KUPARUK=,:.~, , PROJECT
..~.A.~o Fo.: ALASKA OILFIELD ~'~
SERVICES ~' : '
J. HERMAN ~
l III#1# Illlltll Il ·
IIII
F. ROBERT BELL
No. 3252-5
~~"LIST FoR'~NEW WELI?JPERMITS
,,.. , __.~" :. _/' :. .... .,, .,,:?;
Company
ITEM
(1) Fee 1.
(2) Loc
APPROVE DATE ·
·
? 'l ..:' tf-
~2 thru 8) '
mi
5.
6.
7.
8.
(3) Aamin(~~'~ ~-/'~ 9.
(~ thru 12) ' 10.
' /~..:;~,"~'( . 7"'/-~.(' 11.
(10 and 12) 12.
(4) Ca
('13 thru. 21) '
(22 thru 26).
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.'
25.
26.
27.
YES NO
Is the permit fee attached ...........................................
Is well to be located in a defined pool ........................ .. .~.~
Is weli located proper distance from other wells ....
. .
..
Is 'sufficient undedicated acreage available in this pool ...........,
Is well to be deviated and is wellbore plat included ..... · .' ..'..
Is operator the only affected party .................................
Can permit be approved before ten-day wait ..........................
REMARKS
have bond in force '
Does operator a .................... , .............
Is a conservation order needed ........................ . .............. .
Isadministrative approval needed ...................................
Is the lease number appropriate ................ , .................... ~ ...
Is conductor string provided ........................................ ~
Is enough cement used to circulate on conductor and Surface ......... ~
Will cement tie in surface and intermediate or production strings ...~
Will cement cover all known productive horizons ......... . ............ ~
Will surface casing protect freSh water zones ....... ' . · ..~
Will all Casing give adequate safety in collap;e, tensi;n a~ ~g~;~
e~
Is this well to be kicked off from an existing wellbore .............
Is °ld wellbore abandonment procedure included on 10-403 ............
Is adequate wellbore separation proposed ............................. ~.
Is a diverter system required ....................................... ~
Are necessary diagrams of div. erter and BOP equipment attached ....... ~
Does BOPE have sufficient pressure rating - Test to ~d)d)C~ psig ../~F
Does 'the choke manifold comply w/API RP-53 (Feb.78) ..................
Is the presence of H2S gas probable ............................... '. .
Additional requirements .............................................
Additional Remarks:
t::;i
o
i-.]
~z
H 0
r~ ~--~
Geology: Engineering:
JAL~/~,,_~.
rev: 03/13/85
6.011
INITIAL GEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO. SHORE
,,,
¢',',/ I ,'/ 4¢? o Ii] o /J
,,,
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
****************************
" ~0 ~----.--.--
~FI~ATIO~
LXBTTN~
* TAP~ HEADER **
ERVT'CE .A~!
R~G~N IFS
APE NAME I
DNTI'NUA?ION
REV~OU$ TAPE
O~M£N?8 :
*, FIbE HEADER **
IEeE NAM~AMi~D~:? .00
V~CE ~
A?EERSIO~I # ~
AXIMUM I, EN TH t 1024
I~E TYPE I
REV~OU$ rYb~ I
* INP~RIqA?IrJN RECORDS
NEM ~OUT~NTS
UNtT T'¥PB CA~E SIZE CODE
R~$i ~ OeO 000 OOl 065
COMMENTS **
SCHLUMBERGER *
AbASKA COMPUTING CENTER *
OHPAN¥ = AT~AN?IC RICHfieLD COHP~NY
FP OlO'H02 VERI~ICA?I'ON bIS?lNG PAGE:, 2
I,bb = 3C-O':S,HAbLOw SANDS
~bD =.K, UPARU:K
)UN?¥ =,,NOR?H, S~OPE:BOROUGH
~AT~ =. ALASKA
#ONE, DA?E LOGGEDi ~7~dUb*:~985
~. , e,, 9,.:~ R~C '=, 4,,490.~, 69~0 DF
YP.'o. IO'H02 YEti,FICA?ION b'i~$?ING: PA. OE 3::
ltl?R'Y BLOCK S'
,. ,~ ~ S~OD
bY b'Z: O0 0
~APi O0
oooooo.
,,,~i.ooOo ~:[,,u ,.o
~47~9375
~R .667
P 73 5
EPT 3000'00 8FbU
: OR ,0000
EPT 1469,50~
, ~R 4 09395
40..1094 IbM 4.4531
6.S859 'IbM '6,9180
6.7500 IbM 6.47S6
8.6919 IbM
12.2969 TLM lt,OIS6
69,0625 I~M 54,$000
~ FILE ?RAILER
'ILK NA#~ S~DTT .001
ERVIC~ NAME :
~P 010,~02 VERIFICATION L~$TING PAGE 4
**'*****,*.**EOF
~'TE 195/07/20 '
R:TG~N :FS~A
ONT~NUA?~ON
EXT
OMM~
E~V~CENA~E :~D~T
ATE, ~95/0T/~0
R~G~N
OMMRNTS :
EOF
EOF
Alaska Oil & Gas Cons. Commission
Anchorage
t,' !~'4 ~ ':r %"X P~ CA?E SiZE CODE
m~ ~m ~mm ,m~ ,m~ mm Imm m ~m ,mm Im 4m~ mm m Im Im
. ,: ,. : ~, ;.;," (). z~, ,~ ~.~: .,'.,. I "'(:, 000 000 0!6 065
~, ~ : ~ t:- o 0 0 0 0 ~, O 0 0 4 0 6 5
:'~ .. v. ~ T:~,'. ~ !i,,: r; .T ~ i,_,~ OOO 000 014 065
:~ ~": G: ~i: 000 000 002 065
~,'~,.,~: ~ "", 0~0 000 004 0~5
~aC'l: 1 ..~ 0o0 OeO 002 065
,~- ,,,~ r ~,,:~~' ~'~"T~, ~'r.., ~;~ I3: ~o~ CA~ SIZE CruD5
Pt' O0 nor) O0 0 0 4 1 68 000000000000 0
O ~ ~:~ ~'-', O0 220 O1 0 o 4 1, 68 00000000000000
o~.t~'.~,,':, nO ~ 20 d.b 0 0 .~ I 68 00000000000000
nli'~,~,,,~ no 12n 44 0 0 4 I 68 00000000000000
'V nO nl.r, Ol 0 0 4 1 68 000o0000000000
c ~.~: 0() 310 01 0 n 4 1. 68 00000000000000
aA~ .i~ O0 310 01 t, 0 4 I, 68 00000000000000
't~ no ~n ol 0 o 4 i. fi8 00000000000000
q/C.~ ~0 ]5O n2 0 0 ~ i 68 00000000000000
C;lr' 3 oO 356 O1 0 0 4 1 68 00000000000000
O0 ~2n nl 0 0 ~ 1 68 00000000000000
aO aUo O0 0 0 4 1 6~ 00000000000000
p,,; n() ~9n O0 0 0 4 i 68 OOO00000000000
eps OO '~3~ 31 0 0 4 I 68 00000000000000
~ P
) F; r~ T
~P
2
7
8
2~8
O, 23
7.96
6.16
0, 1,
7.
5.75
9.7'1
7.5(;
~ 35
n nS
24.57 '~"
12,
26.3
1.2
-09
-~9
-~9
!3
-09
-09
~p
)EPT
q P P I'
o
00
95
6 l,
00
n 0
7'3
'! 8
? ().:I 4
9375
5000
'7u~2
2,1~8
021.5
'73 ~ 5
02.'~ 3
?500
1936
66~5
T [,P
¢; R
ThO
r," C:' "J b
T I.: P
vC i>~ L,
TI, O
-99~.2500
2,9846
257.8906
.tS,3457
64'5808
1t, 07.6875
5.6414
95,3398
2,9905
796,817b
898,81~5
~.9670
!1~,g648
2.8440
3,2561
1213,2773
.0803
81?.3125
1. 7784
127~9023
3,8069
4.86,B9~6
1.7217
'g9q,250V
-ggg,2500
-q99.2500
~.310B
-099.2500
-99m.2500
2.4124
-999,2500
-a99.7500
-~9o.75no
· t, 68
A [, l
NRA
CALl
RqI:tA
i
CALl
~N~A
R N R A
T b ~
CALl
CALl
l L, M
~NRA
T, b ,~
CAT., i
CAt, I
PNI~A
!
CALl
O000ooooonooO0
-999 2500
I~i5020
,3 ' 15 0'6
.~410
5.7117
0566
9578
8'6
874
463
94
3.9163
1.7745
-999.2500
-99q,~500
2.3616
-999.~500
-g99.2500
2,3909
-~99.2500
= 9~.7500
- 2 Q. ':': 9"; 1,
·
?.n'7 2 TI.,!?
I 8 t, 1 87 5 ~F,
- q 9 9,2 ,,5,' 0 0 r C ~,~
114.7773
106 ? 7 '73 C ~
-g9o:25o0
- 99 9.9, 5 00 F' C, '~'
- q 9 q. 2500 ,,tT' C, !',: L,
2.57
10!
6q. 4e,,4,5
-o9o.2bnO
1.oyn3 T[,,F'*
-ogq,?Sn¢
2.71~2
-~99.2500
-999,2500
-999.~500
-999.2500
-99g'2500
1,8692
-999.~500
'999,2500
-qgq.?500
'q99, ..... 500
-09g,2500
-99~,~500
-g99 500
-999. 2500
-99q.2500
~.27'?b
'g90,2500
-qgg.2500
-99g.2500
].Olg9
-099.2500
-g99.2500
-qgg.?500
9.5198
-q9g.2500
-999.2500
-999.2500
2.3909
-099.2500
-999.7500
-~9g.7500
(.9571
-o99.2500
-~9~.25no
-~9g.7500
2.6057
-o9q.2500
-qgg.2500
C A 1,, i
CAbI
CALl
CALl
CALI
~,NPA
CALl
T L ~
CALI
CAI.l
~N'RA
'999,~500
~,~9~7
-999,2500
'g99.2500
1,9464
-999.2500
'999,2500
,2,q709
-9:i9,2500
-999,.~500
~. 9944
-0~9,2500
.999. :~5oo
2,~81,5
-g99,2500
-99g.~500
2,8596
-999.2500
-ggg,2500
~,566'7
-99g.2500
-999.2500
?,4182
-999.2500
-ggg,2500
1.9473
-99g.2500
-ggg.2500
2,6057
-0q9.2500
-qgg.~500
R i"; P b': - a 9 ¢'~ "~ q. n 0 D ~.! I4 £,
r)£pT 7 lO~.c~u00
r') t'. o T '~ n~!n, r' L)c.' 0
S t:, - 8 '~ . .',: 2 2 7 ~ !:.'
2.69~5
t, 20.2773 Ge:
-c,. 9c), 2590
96.6523 (; E
-c~gqoTbO0
I 13.9(: 23
-q99,7500 :,f,. al'
.090,250,0 r." C ~.!b
? 0{,70 Tl..h
9n: 2773
-~99. 7500 .~C~L,
1 <":~ 1. r., 7.. 73
-990. ?'.: (; 0 :' i-,: ~. T
-ago ?.brio F(
- ~ . ,
-090. 2500 CALl
-990.2500 R,~RA
=99~.2500
:999,2500 CALl
990,2500 ~NRA
999,2500
2,~-709 IL~
-990'2500 CA:bi
-',99 g 2 t'{ 00
2 7112 Ih~
-999 2500 CA[,I
-999 ~500 RNRA
-999 2500
2.6975 'lbf~
:999,~S00 CAi..,!
~99,2500 PN~A
-990,2500
3.4475 IL~
-m90.2500 CAI, I
-099.2500 RNRA
-o99.2500
3,25?2 lb"
-999.2500 CALl
-99q.~500
3.4690 lh~
-~9o.2500 CAti
-990.2500 RN~A
-990.2500
-99~.2500 CAt, I
?,4729
'999,2500
'999,2500
?..,8108
-099,2500
-~gO,~500
,,.qg,~:4944
'~500
2,6897
-~,19,2560
-999.25oo
2 6838
-~99. 500
2.~31'3
~999, 500
999,2500
3 1.389
-q99;2500
-999.~500
3 4241
9~9.~500
3.2.~7
· 99,2500
3 3616
-n99.2500
3,1.576
-099,~500
~ H 0
~ kt [? 1:.':.,
3 F: P
e 0 ("~ 0 % f:' '!', ),,i
22?7 Ch:
? 5 r) 9 [.) R ~..f
- q 9 q. 2 ..i 0 0 D R :H L~
...a 9 o.,. 9 b 0 0 ,,I C,.,, ~? L
-~1%.r:t i27
2. ?-!: n b
-q9q. 250o
~0 ~
9.2 b 00
.a9o
~7,5'Z73
-q99. 2500
-agq, 2BOO
~, n ? 73
-q99
~ ,
2.52'56
~ 17,714,,8
-09~.~500
2.5775
-~}99.2hOC~
o, 25 n 0
9,46 ~, 2
~7 77'73
-99~: ~ ?500
5, n273
0, n ,',; ~ 9
0.01.07
-999.,2500
3,0862
-999,2500
-999.2500
-~99,2500
2.961.~
-999,2500
.*999,2500
2,,7717
-99g,2500
-999,P500
6838
: $oo
999',2500
'990,2500
2,~049
-~99,2500
-n99~2500
2,7893
-999,2500
2,6799
],~807
640,3125
2.7502
97o559~
3.5999
!12.5898
!.5627
606.g!25
~.~.065
Cg[.,.I.
R~RA
T LM
CALl
' ~ 'I":
CALl
~NRA
CAbI
RN~A
CALl
RNRA
C A I,, .I,
I t,.: ~
~RA
C4~i
RNRA
CA[,I
T
-g99.2500
3,07~5
-g~9,~500
-~99.~S00
2,8069
2~99,~$oo
q'~9,~500
2,691,7
~.6370
-99~500
2,~405
2.6331
-999,~500
-Q99. 500
~,&077
1~.8691
3.6741
2.6807
11 58?9
315374
2,6194
11.5332
3,76a8
lO,~77o
I H r'~ t:,~ ", 'l 362 ni,< 'M U
2! 4, ~, 5 (,,,C 9 F (J Ni' I.,,
0.0327 ~,i R ~ T
2 ~ ,7, 5. S r.,, C:, 0 ? (" F iL,
2 ~ 3 q. % l, n 9 ~ C ?4 ib
2,'.
1721 l; L,r,:'
0.596 ;;,i r: ,~, 1'
5 (': 00 .~" C !',:.[,
2000.6~';75
55,!.{.,55
t P '1 ~. 6675 t,, C: *,f b
106. 527 3
3'7092
595,3125
3, .t596
3,541.. 3
593.3125
2,6213
10~..4023
3,5784
3,~756
92.2773
3,55B~i
644.'8125
? 5627
87:4,023
3,6 3.1 '.l
3.48~7
3"5959
3.4768
80.g023
36741.
597:g!.2b
!?.6973
bl,7305
3.~967
447,64a6
17,B643
C A [., I
F~ N P A
C A !., 11
R
C A L .I
I' bM
CALl
qNRA
I ',!.¢ M
PNRA
T Lf4
C A I., I
1,0,41 0
'6'
3.22 8
11.3613
3.6116
2,4221
1,1660
13,8147
13, 84
~.3889
11.6895
3,8635
3 3342..
0
3.2288
1t,5020
3,8616
2000 6875
9:1348
2000.6875
-e9g.25no
-~9g.2500