Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-003Originated: Delivered to:8-Jul-25Halliburton Alaska Oil and Gas Conservation Comm.Wireline & Perforating Attn.: Natural Resource TechnicianAttn: Fanny Haroun 333 West 7th Avenue, Suite 1006900 Arctic Blvd. Anchorage, Alaska 99501Anchorage, Alaska 99518Office: 907-275-2605FRS_ANC@halliburton.comThe technical data listed below is being submitted herewith. Please address any problems orconcerns to the attention of the sender aboveWELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPEDATA TYPE LOGGING DATE PRINTS # DIGITAL # E SET#1 1B-04 50-029-20595-00 910151309 Kuparuk River Plug Setting Record Field- Final 30-Jun-25 0 12 1B-05 50-029-20237-00 910106098 Kuparuk River Multi Finger Caliper Field & Processed 19-Jun-25 0 13 1B-05 50-029-20237-00 910106098 Kuparuk River Plug Setting Record Field- Final 21-Jun-25 0 14 1B-11 50-029-20657-00 910151309 Kuparuk River Multi Finger Caliper Field & Processed 1-Jul-25 0 15 1B-11 50-029-20657-00 910149873 Kuparuk River Plug Setting Record Field- Final 1-Jul-25 0 16 1B-15A 50-029-22465-01 910106169 Kuparuk River Plug Setting Record Field- Final 20-Jun-25 0 17 1D-101 50-029-22988-00 910151308 Kuparuk River Packer Setting Record Field- Final 6-Jul-25 0 18 1H-103 50-029-23593-00 910082841 Kuparuk River Multi Finger Caliper Field & Processed 21-Jun-25 0 19 1L-24 50-029-22170-00 910151023 Kuparuk River Packer Setting Record Field- Final 28-Jun-25 0 110 2A-16 50-103-20042-00 910150862 Kuparuk River Plug Setting Record Field- Final 27-Jun-25 0 1PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518FRS_ANC@halliburton.comDate:Signed:Transmittal Date:181-065177-001181-136204-256200-183218-003191-066185-147T40642T40643T40643T40644T40644T40645T40646T40647T40648T406497/9/202581H-10350-029-23593-00910082841Kuparuk RiverMulti Finger CaliperField & Processed21-Jun-2501Gavin GluyasDigitally signed by Gavin Gluyas Date: 2025.07.09 09:29:07 -08'00' C:\Users\grgluyas\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\R97USUAM\2025-02-26_22640_KRU_1H-103_CaliperSurvey_LogData_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 22640 KRU 1H-103 50-029-23593-00 Caliper Survey w/ Log Data 26-Feb-25 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ _____________________________________ Date received Signature ______________________________ ______________________________________ PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM 218-003 T40181 3/4/2025 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.03.04 08:43:44 -09'00' 1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Replace tubing Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 13710'feet None feet true vertical 7059' feet None feet Effective Depth measured 13655'feet 7761'feet true vertical 3995'feet 4030'feet Perforation depth Measured depth True Vertical depth Tubing (size, grade, measured and true vertical depth) 4-1/2" L-80 6801' 3796' Packers and SSSV (type, measured and true vertical depth)7761' 4030' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: West Sak Oil Pool 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title:Contact Phone: Slots: 8123-8357', 8548-8620', 8800-9150', 9535-9649', 9798-9950', 10221-11252', 11637-12901', 13296-13610' Slots: 4088-4097', 4100-4099', 4092-4083', 4072-4068', 4059-4054', 4049-4022' 4035-4017', 4006-3996' 323-668 Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. N/A Packer: Baker HRD-E ZXP SSSV: N/A Sydney Long sydney.long@conocophillips.com (907) 265-6312Senior RWO/CTD Engineer 5894' 4-1/2" measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 2300 Gas-Mcf MDSize 119' 2030 1330460 Shut-In 330 measured TVD 7-5/8" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 218-003 50-029-23593-00-00 P.O. Box 100360 Anchorage, AK 99510 3. Address: ConocoPhillips Alaska, Inc. N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: ADL0025638, ADL0025639 Kuparuk River Field/ West Sak Oil Pool KRU 1H-103 Plugs Junk measured Length Liner 8074' Casing 4088'8112' 13655' 3995' 1836' 119'Conductor Surface Intermediate 20' 10-3/4" 80' 1877' 1770' Burst Collapse Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov  By Grace Christianson at 10:23 am, Mar 11, 2024 RBDMS JSB 031424 DSR-3/11/24 Page 1/7 1H-103 Report Printed: 3/8/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/4/2024 14:00 2/5/2024 00:00 10.00 MIRU, MOVE RGRP T Rig repair. C/O LPR. C/O CMV #10. Various welding projects. 0.0 0.0 2/5/2024 00:00 2/5/2024 02:30 2.50 MIRU, MOVE RGRP T Rig repair. C/O LPR. C/O CMV #10. Various welding projects. 0.0 0.0 2/5/2024 02:30 2/5/2024 05:00 2.50 MIRU, MOVE MOB P Move rig F/ 1A T/ KOC 0.0 0.0 2/5/2024 05:00 2/5/2024 06:30 1.50 MIRU, MOVE OTHR P Stand by at KCC for field wide crew change out 0.0 0.0 2/5/2024 06:30 2/5/2024 09:00 2.50 MIRU, MOVE MOB P Continue KCC to 1H-103 0.0 0.0 2/5/2024 09:00 2/5/2024 15:00 6.00 MIRU, MOVE MOB P Arrive on 1H pad, R/U cellar. Much snow removal behind tree. Lay double rig mats. Pick up Stream flo well head and equipment in cellar behind well. 0.0 0.0 2/5/2024 15:00 2/5/2024 16:00 1.00 MIRU, MOVE RURD P PJSM, Spot rig. Safe out rig, Initial WH pressures 180/200/30. Berm cellar. More snow removal for tanks 0.0 0.0 2/5/2024 16:00 2/5/2024 19:00 3.00 MIRU, MOVE RURD P Move snow next to rig observed mouse hole that was installed for D-25 right below cutting shoot. Approximately 22" high. Unable to set cuttings box. Plan forward get welders here to cut off mouse hole. Continue to berm cellar 0.0 0.0 2/5/2024 19:00 2/5/2024 22:00 3.00 MIRU, MOVE RURD P Set Cutting box, Install cuttings chute. Take on fluids, Set TT and open top, R/U hardline, R/U circ manifold Rig accepted @ 22:00 Hrs. 0.0 0.0 2/5/2024 22:00 2/5/2024 23:30 1.50 MIRU, WELCTL RURD P R/U circ manifold. 0.0 0.0 2/5/2024 23:30 2/6/2024 00:00 0.50 MIRU, WELCTL PRTS P PT circ manifold and tiger tank lines T/ 2500 PSI. B/D circ equipment 0.0 0.0 2/6/2024 00:00 2/6/2024 00:30 0.50 MIRU, WELCTL SFTY P PJSM w/ rig crew on bullhead kill well. 0.0 0.0 2/6/2024 00:30 2/6/2024 03:00 2.50 MIRU, WELCTL KLWL P Bleed free gas from TBG F/ 150 PSI T/ 130 PSI. Went straight to fluid. Bleed free gas off IA F/ 175 PSI T/ 140 PSI. Small gas cap, then fluid. Bleed 3 bbls freeze protect back T/ tiger tank. B/D tiger tank lines. Bullhead 28 Bbls heated deep clean pill followed by248 Bbls down IA @ 4 BPM. ICP=257, FCP=97. Bled down T/ O PSI. Pump 31 Bbls heated deep clean pill followed by 130 Bbls seawater down TBG @ 4 BPM, ICP=207. FCP=46, Bleed down T/ 0 PSI. 0.0 0.0 2/6/2024 03:00 2/6/2024 03:15 0.25 MIRU, WELCTL RURD P Shut well in. B/D circ lines & tiger tank. 0.0 0.0 2/6/2024 03:15 2/6/2024 03:45 0.50 MIRU, WELCTL OWFF P OWFF. 30 Min no flow check. Well on vac. 0.0 0.0 2/6/2024 03:45 2/6/2024 04:00 0.25 MIRU, WELCTL MPSP P Set HP BPV 0.0 0.0 2/6/2024 04:00 2/6/2024 04:15 0.25 MIRU, WELCTL PRTS P Rolling PT on BPV @ 3 BPM for 10 min. BPV dry on top. 0.0 0.0 2/6/2024 04:15 2/6/2024 05:00 0.75 MIRU, WHDBOP OWFF P OWFF gas observed coming from IA. Pump 15 Bbls @ 3 BPM. Well back on a vac. 0.0 0.0 2/6/2024 05:00 2/6/2024 06:30 1.50 MIRU, WHDBOP NUND P N/D adaptor spool & tree. Install test dart, function LDS Pumping 15 - 20 BBLS @ 3 BPM every 30 min to keep well on a vac. 0.0 0.0 Rig: NORDIC 3 RIG RELEASE DATE 2/11/2024 Page 2/7 1H-103 Report Printed: 3/8/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/6/2024 06:30 2/6/2024 16:30 10.00 MIRU, WHDBOP NUND P Remove flow box from top of BOP stack, N/U BOP to TBG head, Install flow box on top of stack, center stack up, hook up all lines Pump 15 -20 BBLS every 30 min to keep well on a vac 0.0 0.0 2/6/2024 16:30 2/6/2024 21:30 5.00 MIRU, WHDBOP NUND P Install koomey line fittings on lower single gate, install 2 7/8" x 5 1/2" VBR's in lower pipe rams, re plumb hydraulic lines for koomey lines on single gates, test function rams, grease choke manifold, HCR's, manual valves on stack and test spool valves Pump 15 -20 BBLS every 30 min to keep well on a vac 0.0 0.0 2/6/2024 21:30 2/7/2024 00:00 2.50 MIRU, WHDBOP RURD P Rig up to test BOP, fill stack with water , purge air out of system, change out MM#13 valve 3" Demco kill, tighten gland nuts on TBG head, obtain good shell test Pump 15 -20 BBLS every 30 min to keep well on a vac 0.0 0.0 2/7/2024 00:00 2/7/2024 10:00 10.00 MIRU, WHDBOP BOPE P Test BOPE at 250/2500 PSI for 5 Min each, Test annular, UVBR's with 3 1/2" and 4 1/2" test joints, Test blinds rams. Choke valves #1 to #13, upper/lower top drive IBOP. Test 3 1/2" IF FOSV and dart valve. Test 3 ½” and 4 1/2" EUE FOSV. Test 2" rig floor Demco kill valve MM #13. Test manual/HCR kill valves & manual/HCR choke valves. Test two ea 2 1/6" gate auxiliary valves below LPR. Test hydraulic and manual choke valves to 1500 PSI and demonstrate bleed off. Perform accumulator test. Initial pressure= 2925 PSI, after closure= 1700 PSI, 200 PSI attained = 23 sec, full recovery attained = 122 sec. UVBR's= 4 sec, Annular= 16 sec. Simulated blinds= 5 sec. HCR choke & kill = 1 sec each. 4 back up nitrogen bottles average 1950 PSI. Test gas detectors, PVT and flow show. Witness waived by AOGCC rep Kam StJohn Test BOP breaks on new single gate and choke manifold #10 flange breaks to 250/5000 PSI F/5 min each on test #1 Pump 15 -20 BBLS every 30 min to keep well on a vac 0.0 0.0 2/7/2024 10:00 2/7/2024 11:00 1.00 MIRU, WHDBOP RURD T Test BOPE at 250/2500 PSI for 5 Min each, UVBR's failed initial test. C/O 2 7/8" x 5 1/2" VBR's Test UVBR's with 3 1/2" and 4 1/2" test joints, 0.0 0.0 2/7/2024 11:00 2/7/2024 12:00 1.00 MIRU, WHDBOP RGRP T Trouble shoot hi line problem unsuccessfully. Remain on generator power. 0.0 0.0 2/7/2024 12:00 2/7/2024 13:15 1.25 MIRU, WHDBOP RURD P B/D, R/D testing equipment, B/D, R/D circ hose off of IA. Install mouse hole. 0.0 0.0 Rig: NORDIC 3 RIG RELEASE DATE 2/11/2024 Page 3/7 1H-103 Report Printed: 3/8/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/7/2024 13:15 2/7/2024 13:30 0.25 MIRU, WHDBOP MPSP P Pull test dart, check for pressure under BPV Slight gas breaking out of TBG. 0.0 0.0 2/7/2024 13:30 2/7/2024 14:15 0.75 MIRU, WHDBOP CIRC P Bullhead 106 BBLS down TBG @ 3 BPM, 30 PSI 0.0 0.0 2/7/2024 14:15 2/7/2024 14:45 0.50 COMPZN, RPCOMP OWFF P OWFF 0.0 0.0 2/7/2024 14:45 2/7/2024 15:15 0.50 COMPZN, RPCOMP RURD P M/U landing joint. Set down 10K. BOLDS. 0.0 6,804.0 2/7/2024 15:15 2/7/2024 15:30 0.25 COMPZN, RPCOMP PULL P Pull hanger T/ 6774'. Hanger off seat @ 165K, PUW=93K. 6,804.0 6,774.0 2/7/2024 15:30 2/7/2024 16:00 0.50 COMPZN, RPCOMP PULL P L/D landing joint. 6,774.0 6,774.0 2/7/2024 16:00 2/7/2024 21:45 5.75 COMPZN, RPCOMP PULL P L/D hanger T/6,729'. connect Tec wire to spooling unit POOH L/D 4 1/2" completion F/6,729' T/2,571' Pump 15 BBLS every 30 min down IA 6,774.0 2,571.0 2/7/2024 21:45 2/7/2024 22:30 0.75 COMPZN, RPCOMP RURD P Stop and remove spool of Tec wire from spooling unit, due to cable pushing side plate of spooling unit out and causing pad eye on spool to contact the frame of spooling unit, not allowing spooler to spool up Tec wire 2,571.0 2,571.0 2/7/2024 22:30 2/7/2024 23:15 0.75 COMPZN, RPCOMP PULL P POOH L/D 4 1/2" TBG F/2,571' T/2,171' 2,571.0 2,171.0 2/7/2024 23:15 2/7/2024 23:45 0.50 COMPZN, RPCOMP DISP P R/U circ line and head pin, bullhead in 30 BBLS 8.6 PPG seawater deep clean pill, chase W/10 BBLS 8.6 PPG seawater to clean inside of tubing due to oil draining out Pump @ 4 BPM 45 PSI R/D lines 2,171.0 2,171.0 2/7/2024 23:45 2/8/2024 00:00 0.25 COMPZN, RPCOMP PULL P POOH L/D 4 1/2" TBG F/2,171' T/1,842' 55K UP 2,171.0 1,842.0 2/8/2024 00:00 2/8/2024 02:00 2.00 COMPZN, RPCOMP PULL P POOH laying down 4 1/2" TBG F/1,842' to surface Recover 173 cross collar clamps and one 1/2 clamp 1,842.0 0.0 2/8/2024 02:00 2/8/2024 03:45 1.75 COMPZN, RPCOMP RURD P Clean clear rig floor, rig down Halliburton spooler, remove cannon clamps, remove Tec wire from pipe shed Install 3 1/2" DP elevator's, prep to pick up DP from pipe shed 0.0 0.0 2/8/2024 03:45 2/8/2024 04:15 0.50 COMPZN, RPCOMP BHAH P Pick up single drill pipe M/U BHA #1 Baker GLock plug T/18' 0.0 18.0 2/8/2024 04:15 2/8/2024 10:00 5.75 COMPZN, RPCOMP PULD P P/U 3 1/2" DP. F/18' T/4991', PUW=93K, SOW=76K. 18.0 4,991.0 2/8/2024 10:00 2/8/2024 10:30 0.50 COMPZN, RPCOMP PACK P K/U & set RBP @ 5000' COE. Top @ 4995'. Release from plug. P/U T/ 4991' 4,991.0 4,991.0 2/8/2024 10:30 2/8/2024 11:30 1.00 COMPZN, RPCOMP CIRC P Fill hole. Returns @ 30 Bbls. Circ STS starting @ 3 BPM, 245 PSI. Working up T/ 4 BPM, 450 PSI. Overboard contaminated fluid. 4,991.0 4,991.0 2/8/2024 11:30 2/8/2024 12:00 0.50 COMPZN, RPCOMP RURD P B/D TD. Rack back stand T/ 4926'. R/U testing equipment. 4,991.0 4,926.0 2/8/2024 12:00 2/8/2024 12:15 0.25 COMPZN, RPCOMP PRTS P PT RBP T/ 2500 PSI for 10 Min. 39 strokes to pressure up. 4,926.0 4,926.0 2/8/2024 12:15 2/8/2024 12:30 0.25 COMPZN, RPCOMP RURD P B/D testing equipment. 4,926.0 4,926.0 2/8/2024 12:30 2/8/2024 12:45 0.25 COMPZN, RPCOMP TRIP P POOH F/ 4926' T/ 4560', PUW=93K. 4,926.0 4,560.0 Rig: NORDIC 3 RIG RELEASE DATE 2/11/2024 Page 4/7 1H-103 Report Printed: 3/8/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/8/2024 12:45 2/8/2024 13:15 0.50 COMPZN, RPCOMP BHAH P M/U BHA #2 Storm packer T/4,560'. RIH T/4,680' 4,560.0 4,680.0 2/8/2024 13:15 2/8/2024 13:30 0.25 COMPZN, RPCOMP PACK P Set storm packer @ 100' COE. Top @ 94'. Release from packer. Rack back stand of DP. 4,680.0 0.0 2/8/2024 13:30 2/8/2024 14:00 0.50 COMPZN, RPCOMP PRTS P PT storm packer T/ 2500 for 10 Min. 6 strokes to pressure up. 0.0 0.0 2/8/2024 14:00 2/8/2024 14:30 0.50 COMPZN, RPCOMP RURD P R/D testing equipement. 0.0 0.0 2/8/2024 14:30 2/8/2024 17:00 2.50 COMPZN, RPCOMP NUND P Remove flow box from top of BOP, N/D BOP and rack back on pedistal, install flow box back on top of BOP 0.0 0.0 2/8/2024 17:00 2/8/2024 18:00 1.00 COMPZN, RPCOMP NUND P Remove side outlet valves from Vault TBG head for inspection 0.0 0.0 2/8/2024 18:00 2/8/2024 20:30 2.50 COMPZN, RPCOMP NUND P Check pack off void for pressure, N/D Vault tubing head, install new Orings on pack off, mobilize Stream Flo equipment into cellar Warm up Stream Flo tubing head and clean ring grooves to install on well head 0.0 0.0 2/8/2024 20:30 2/8/2024 21:30 1.00 COMPZN, RPCOMP NUND P N/U Stream Flo tubing head Obtain RKB's 28.04' to hanger profile 0.0 0.0 2/8/2024 21:30 2/8/2024 22:00 0.50 COMPZN, RPCOMP PRTS P Test pack off T/5000 PSI F/10 min, good test 0.0 0.0 2/8/2024 22:00 2/8/2024 22:30 0.50 COMPZN, RPCOMP SFTY P Safety stand down with C crew 0.0 0.0 2/8/2024 22:30 2/8/2024 23:00 0.50 COMPZN, RPCOMP NUND P Install secondary 2 1/16" gate valve on IA 0.0 0.0 2/8/2024 23:00 2/9/2024 00:00 1.00 COMPZN, RPCOMP NUND P Remove flow box from top of BOP stack, N/U BOP 0.0 0.0 2/9/2024 00:00 2/9/2024 01:30 1.50 COMPZN, RPCOMP NUND P N/U BOP, tighten bolts on BOP and TBG head 0.0 0.0 2/9/2024 01:30 2/9/2024 03:00 1.50 COMPZN, RPCOMP NUND P Install flow box on top of BOP's, center up stack, install riser and hook up all lines 0.0 0.0 2/9/2024 03:00 2/9/2024 03:15 0.25 COMPZN, RPCOMP MPSP P Set test plug 0.0 0.0 2/9/2024 03:15 2/9/2024 03:45 0.50 COMPZN, RPCOMP RURD P Rig up to test BOP breaks, fill lines with water, purge air from system 0.0 0.0 2/9/2024 03:45 2/9/2024 04:30 0.75 COMPZN, RPCOMP BOPE P Test BOP breaks to 250/2500 PSI 5 min each 0.0 0.0 2/9/2024 04:30 2/9/2024 05:00 0.50 COMPZN, RPCOMP RURD P Rig down testing equipment, blow down lines 0.0 0.0 2/9/2024 05:00 2/9/2024 05:15 0.25 COMPZN, RPCOMP MPSP P Pull test plug 0.0 0.0 2/9/2024 05:15 2/9/2024 05:30 0.25 COMPZN, RPCOMP RURD P Install wear ring, break off running tool, lay down working joint 0.0 0.0 2/9/2024 05:30 2/9/2024 07:15 1.75 COMPZN, RPCOMP MPSP P Make up retrieving head for storm packer, RIH make up to twin thread, open storm valve, pull TST-3 packer and lay down 0.0 4,560.0 2/9/2024 07:15 2/9/2024 07:45 0.50 COMPZN, RPCOMP TRIP P RIH F/4,560' T/4,995' 4,560.0 4,995.0 2/9/2024 07:45 2/9/2024 08:15 0.50 COMPZN, RPCOMP MPSP P Latch onto G lock plug, set DN 10K open equalizer port, well drinking fluid. Unset packer as per Baker Let elements relax Begin fill cycle 15 Bbls every 30 Min. 4,995.0 5,006.0 2/9/2024 08:15 2/9/2024 08:45 0.50 COMPZN, RPCOMP SFTY P Safety stand down w/ A crew. 5,006.0 5,006.0 Rig: NORDIC 3 RIG RELEASE DATE 2/11/2024 Page 5/7 1H-103 Report Printed: 3/8/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/9/2024 08:45 2/9/2024 13:45 5.00 COMPZN, RPCOMP TRIP P POOH F/5,006' T/18', PUW=93K L/D drill pipe to shed Fill hole with 15 BBLS 8.6 PPG seawater every 30 min 5,006.0 18.0 2/9/2024 13:45 2/9/2024 14:00 0.25 COMPZN, RPCOMP BHAH P L/D G lock plug 18.0 0.0 2/9/2024 14:00 2/9/2024 15:30 1.50 COMPZN, RPCOMP CLEN P Clean & clear RF & pipe shed. Remove 3 1/2" DP elevators and install 4 1/2" TBG elevators Fill hole with 15 BBLS 8.6 PPG seawater every 30 min 0.0 0.0 2/9/2024 15:30 2/9/2024 21:00 5.50 COMPZN, RPCOMP RURD P Pull wear bushing. Mobilize GBR equipment, SLB & HES spooling units & clamps T/ RF. R/U torque turn equipment. Hang sheaves in derrick for chemical and gauge lines Verify joint count and jewelry running order. Fill hole with 15 BBLS 8.6 PPG seawater every 30 min Note: Safety stand down with B crew @ 18:00 HRS 0.0 0.0 2/9/2024 21:00 2/9/2024 21:30 0.50 COMPZN, RPCOMP SFTY P PJSM, run 4 1/2" completion 0.0 0.0 2/9/2024 21:30 2/9/2024 22:30 1.00 COMPZN, RPCOMP PUTB P Run 4 1/2" completion as per detail T/156' TQ turn Vam Top connections to 4400 FT/LBS, use Artic Grade Jet Lube Seal Guard pipe dope on Vam Top TQ turn HYD 563 to 3800 FT/LBS, use BOL 2000 AG pipe dope on HYD 563 Fill hole with 15 BBLS 8.6 PPG seawater every 30 min 0.0 156.0 2/9/2024 22:30 2/9/2024 22:45 0.25 COMPZN, RPCOMP OTHR P Hook up SLB chemical injection line to injection mandrel 156.0 156.0 2/9/2024 22:45 2/9/2024 23:15 0.50 COMPZN, RPCOMP PUTB P RIH W/4 1/2" HYD 563 F/156' T/221' TQ turn HYD 563 connections T/3800 FT/LBS Use BOL 2000 AG pipe dope Fill hole with 15 BBLS 8.6 PPG seawater every 30 min 156.0 221.0 2/9/2024 23:15 2/9/2024 23:45 0.50 COMPZN, RPCOMP OTHR P Hook up Halliburton TEC wire to gauge mandrel Test T/10,000 PSI F/10 Min Intial readings 14.03 PSI, 44.02°F, Max 10.42mA, Min 3.64mA Fill hole with 15 BBLS 8.6 PPG seawater every 30 min 221.0 221.0 2/9/2024 23:45 2/10/2024 00:00 0.25 COMPZN, RPCOMP PUTB P RIH W/4 1/2" HYD 563 F/221' T/304' 44K DN Install cross collar clamps on pipe TQ turn HYD 563 connections T/3800 FT/LBS Use BOL 2000 AG pipe dope Fill hole with 15 BBLS 8.6 PPG seawater every 30 min 221.0 304.0 Rig: NORDIC 3 RIG RELEASE DATE 2/11/2024 Page 6/7 1H-103 Report Printed: 3/8/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/10/2024 00:00 2/10/2024 10:00 10.00 COMPZN, RPCOMP PUTB P RIH W/4 1/2" HYD 563 F/304' T/ 6743'' 95 UP 70 DN Install cross collar clamps on pipe Test Halliburton TEC wire and SLB Injection line every 1000' TQ turn HYD 563 connections T/3800 FT/LBS Use BOL 2000 AG pipe dope Fill hole with 15 BBLS 8.6 PPG seawater every 30 min 304.0 6,743.0 2/10/2024 10:00 2/10/2024 11:00 1.00 COMPZN, RPCOMP PUTB P K/U & wash down F/ 6743' T/ 6794.5' @ 2 BPM, 0 PSI. Unable to see pressure spike due to loss rate. Fill IA, static fluid column. P/U, fluid started falling in stack @ 6780.5'. 6,743.0 6,780.0 2/10/2024 11:00 2/10/2024 12:00 1.00 COMPZN, RPCOMP RURD P L/D joints # 161, #160, #159. M/U space out pups 9.74', 9.73'. M/U joint #159. T/ 6759'. 6,780.0 6,759.0 2/10/2024 12:00 2/10/2024 13:00 1.00 COMPZN, RPCOMP PULD P P/U landing joint M/U T/ hanger. M/U hanger T/ string. K/U. Fill hole w/ 15 Bbls 8.9 PPG seawater every 30 Min. 6,759.0 6,759.0 2/10/2024 13:00 2/10/2024 14:00 1.00 COMPZN, RPCOMP CRIH P Terminate gauge & chem lines through hanger. PT terminations T/ 5000 PSI. Pump 190 Bbls CI seawater down IA. 6,759.0 6,759.0 2/10/2024 14:00 2/10/2024 14:30 0.50 COMPZN, RPCOMP CRIH P RIH & land hanger w/ bottom of seals @ 6800.52' adjusted ORKB. Total of 167 SLB cross collar clamps ran. Drop ball & rod. Fill tubing. 6,759.0 6,800.0 2/10/2024 14:30 2/10/2024 14:45 0.25 COMPZN, RPCOMP PRTS P PT hanger seals T/ 5000 PSI for 10 Min. 6,800.0 6,800.0 2/10/2024 14:45 2/10/2024 17:00 2.25 COMPZN, RPCOMP RURD P Rotate landing joint T/ right engage C3 snap ring on hanger. R/U testing equipment TBG & IA. 6,800.0 6,800.0 2/10/2024 17:00 2/10/2024 17:30 0.50 COMPZN, RPCOMP PRTS P PT TBG T/ 3000 PSI for 30 Min PSI Start TBG/IA 3160/60 15 Min = 3140/60 PSI 30 Min = 3140/60 PSI Bleed TBG DN to 1550 PSI 6,800.0 6,800.0 2/10/2024 17:30 2/10/2024 18:15 0.75 COMPZN, RPCOMP PRTS P Test IA T/2500 PSI F/30 Min PSI at start IA/TBG 2760/1920 15 Min = 2720/1920 PSI 30 Min = 2720/1920 PSI 6,800.0 6,800.0 2/10/2024 18:15 2/10/2024 18:45 0.50 COMPZN, RPCOMP CIRC P Dump TBG PSI, shear out SOV Circulate down IA up TBG @ 2 BPM 875 PSI, pump 10 BBLS total 6,800.0 6,800.0 2/10/2024 18:45 2/10/2024 19:30 0.75 COMPZN, RPCOMP RURD P Blow down lines, Rig down circulating equipment 6,800.0 0.0 2/10/2024 19:30 2/10/2024 20:00 0.50 COMPZN, WHDBOP MPSP P Set HBPV in hanger, test from below T/1000 PSI F/10 Min Blow down lines and rig down 0.0 0.0 2/10/2024 20:00 2/11/2024 00:00 4.00 COMPZN, WHDBOP RURD P C/O lower pipe rams to 7" solid body, clean and clear rig floor, suck oi/seawaterl from inside of stack Remove blind flange on test spool and clean cement out R/D SLB, Halliburton and GBR equipment Call out steam truck to thaw out cuttings tank and suck out for rig move Clean pits 0.0 0.0 Rig: NORDIC 3 RIG RELEASE DATE 2/11/2024 Page 7/7 1H-103 Report Printed: 3/8/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/11/2024 00:00 2/11/2024 02:30 2.50 COMPZN, WHDBOP RURD P Pull riser, remove flow riser from top of BOP 0.0 0.0 2/11/2024 02:30 2/11/2024 04:30 2.00 COMPZN, WHDBOP NUND P N/D BOP, rack back and secure on BOP stump Put flow riser on top of BOP and secure 0.0 0.0 2/11/2024 04:30 2/11/2024 09:30 5.00 COMPZN, WHDBOP NUND P Install CSBS seal in hanger neck, Install test dart N/U TBG head adaptor, Terminate TEC and injection lines at TBG head adaptor Test TBG head adaptor and lines thru TBG head adaptor to 5000 PSI F/10 min. Final gauge readings 1726.15 PSI, 67.9* F. 0.0 0.0 2/11/2024 09:30 2/11/2024 11:30 2.00 COMPZN, WHDBOP NUND P N/U 4 1/16" tree. Install companion flange on production wing valve. Send spool off RF. 0.0 0.0 2/11/2024 11:30 2/11/2024 12:45 1.25 COMPZN, WHDBOP RURD P R/U LRS and circulating lines for freeze protecting and U-tubing well 0.0 0.0 2/11/2024 12:45 2/11/2024 13:30 0.75 COMPZN, WHDBOP PRTS P PT tree T/ 5000 PSI 0.0 0.0 2/11/2024 13:30 2/11/2024 14:00 0.50 COMPZN, WHDBOP MPSP P Pull test dart & BPV 0.0 0.0 2/11/2024 14:00 2/11/2024 15:45 1.75 COMPZN, WHDBOP FRZP P LRS pump 83 Bbls diesel freeze protect @2 BPM. ICP=1200. FCP=1400. Release LRS. U tube well allow PSI to equalize. 0.0 0.0 2/11/2024 15:45 2/11/2024 17:15 1.50 DEMOB, MOVE RURD P B/D, R/D circ equipment. Secure tree. Take final pressures T/IA/OA = 60/50/25. 0.0 0.0 2/11/2024 17:15 2/11/2024 18:00 0.75 DEMOB, MOVE RURD P Clean up tree and around celler area prep for rig move PJSM with crew about prepping to move rig Rig release @ 18:00 HRS 0.0 0.0 Rig: NORDIC 3 RIG RELEASE DATE 2/11/2024 Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By Last Tag: RKB (stalled out due to deviation) 6,863.0 1H-103 2/15/2024 rogerba Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason: Replaced OV 1H-103 2/27/2024 fergusp Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread CONDUCTOR 20 19.12 38.9 119.0 119.0 94.00 B SURFACE 10 3/4 9.95 40.6 1,876.7 1,770.2 45.50 L-80 Hydril 563 INTERMEDIATE 7 5/8 6.88 37.8 8,112.1 4,088.2 29.70 L-80 Hyd 563 LINER 4 1/2 4.00 7,761.0 13,654.8 3,995.4 12.60 L-80 SLHT Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string Top (ftKB) 35.4 Set Depth … 6,800.5 String Max No… 4 1/2 Set Depth … 3,796.4 Tubing Description Tubing – Production Wt (lb/ft) 12.60 Grade L80 Top Connection HYD 563 ID (in) 3.96 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 35.4 35.4 0.00 Hanger 13.475 Stream Flo 13 5/8" 4 1/2" DLMX tubihg hanger. H style BPV - 6.250-4 stub acme lift threads. Steam Flo DMLX 3.900 2,583.6 2,251.1 55.31 Mandrel – GAS LIFT 6.393 4 1/2" x 1" KBMG, GLM SLB KBMG 3.865 3,810.5 2,921.6 63.26 Mandrel – GAS LIFT 6.394 4 1/2" x 1" KBMG, GLM SLB KBMG 3.865 5,777.8 3,554.9 74.15 Mandrel – GAS LIFT 6.252 4 1/2" x 1" KBMG, GLM SLB KBMG 3.865 6,588.7 3,746.2 77.12 Sensor - Discharge Gauge 5.685 HES Opsis Single Ended Gauge Manre HES Opsis Gauge 3.920 6,653.8 3,761.0 76.60 Mandrel – INJ 6.640 SLB Chemical Injection Mandrel SLB Chem Injection Mandrel 3.989 6,715.3 3,775.6 76.00 Nipple - X 5.201 4 1/2" x 3.813 X nipple 13Cr HES X Nipple 3.813 6,768.1 3,788.4 75.88 Seal Assembly 4.750 Baker GBH-22, 192-47 seal assembly w/ spacer tube 5' from fullly located Baker 192-47 Seal Assembl y 3.870 6,798.6 3,795.9 75.85 Locator 5.500 Baker 5 1/2" Locator Baker Locator 3.880 Mandrel Inserts : excludes pulled inserts Top (ftKB) Top (TVD) (ftKB) Top Incl (°) St ati on No /S Serv Valve Type Latch Type OD (in) TRO Run (psi) Run Date Com Make Model Port Size (in) 2,583.6 2,251.1 55.31 1 GAS LIFT GLV BK 1 1,460.0 2/15/2024 SLB KBMG 0.188 3,810.5 2,921.6 63.26 2 GAS LIFT DMY BK 1 2/10/2024 SLB KBMG 0.000 5,777.8 3,554.9 74.15 3 GAS LIFT OV BK 1 2/27/2024 SLB KBMG 0.313 6,653.8 3,761.0 76.60 4 CHEM Chemic al Injectio n Other 2/10/2024 SLB Chemi cal Injecti on Mandr el with 3/8" SS line SLB 41XX 0.375 Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 7,761.0 4,030.5 75.94 PACKER 5.500 Baker HRD-E ZXP 5.5" x 7.63" Flex-Lock Liner top packer TOP @ 7762.77 Baker PN: H296- 45-0131, Control # 106296350- 01 4.880 7,780.9 4,035.3 75.92 NIPPLE 5.500 Baker 5.5" "RS" Packoff Seal Nipple 17# L-80 Hyd 563 box x box Baker PN: H294- 01-0656, Control # 103296385- 03 4.880 7,813.2 4,043.2 75.88 XO 5.500 5.5" Hyd 563 15.5 # box x 4.5" 12.6# TXP- pin Crossover 3.930 8,638.4 4,098.4 91.31 SWELL PACKER 6.340 Baker 6.0" OD Swell Packer #6 SN: 052826-001-36 Baker PN H301-87 -0397, SN: 052826-001 -36 3.970 8,776.4 4,093.7 93.01 SWELL PACKER 6.340 Baker 6.0" OD Swell Packer #5 SN: 052826-001-33 Baker PN H301-87 -0397, SN: 052826-001 -33 3.970 9,169.0 4,082.9 90.79 SWELL PACKER 6.340 Baker 6.0" OD Swell Packer #4 SN: 052826-001-18 Baker PN H301-87 -0397, SN: 052826-001 -18 3.970 9,511.8 4,073.2 93.01 SWELL PACKER 6.340 Baker 6.0" OD Swell Packer #3 SN: 052826-001-27 Baker PN H301-87 -0397, SN: 052826-001 -27 3.970 11,270.7 4,021.5 91.85 SWELL PACKER 6.340 Baker 6.0" OD Swell Packer #2 SN:052826-001-40 Baker PN H301-87 -0397, SN: 052826-001 -40 3.970 11,613.5 4,033.6 85.04 SWELL PACKER 6.340 Baker 6.0" OD Swell Packer #1 SN: 052826-001-13 Baker PN H301-87 -0397, SN: 052826-001 -13 3.970 MULTIPLE LATERALS, 1H-103, 3/8/2024 10:59:17 AM Vertical schematic (actual) LINER; 7,761.0-13,654.8 SLOTS; 13,296.4-13,610.3 SLOTS; 11,637.1-12,900.9 SLOTS; 10,221.5-11,252.1 SLOTS; 9,798.4-9,950.4 SLOTS; 9,535.5-9,648.5 SLOTS; 8,800.2-9,150.3 SLOTS; 8,547.8-8,619.8 SLOTS; 8,122.6-8,356.8 INTERMEDIATE; 37.8-8,112.1 L1 LINER; 7,606.7-15,031.9 L2 LINER; 7,443.3-14,133.3 L3 LINER; 7,216.2-14,903.7 L4 LINER; 6,892.4-14,437.1 NIPPLE; 6,826.0 Seal Assembly; 6,768.1 Nipple - X; 6,715.3 Mandrel – INJ; 6,653.8 Mandrel – GAS LIFT; 5,777.8 Mandrel – GAS LIFT; 3,810.5 Mandrel – GAS LIFT; 2,583.6 SURFACE; 40.6-1,876.7 CONDUCTOR; 38.9-119.0 Hanger; 35.4 KUP PROD KB-Grd (ft) 39.03 RR Date 5/4/2018 Other Elev… 1H-103 ... TD Act Btm (ftKB) 13,710.0 Well Attributes Field Name WEST SAK Wellbore API/UWI 500292359300 Wellbore Status PROD Max Angle & MD Incl (°) 94.46 MD (ftKB) 13,280.96 WELLNAME WELLBORE1H-103 Annotation LAST WO: End Date 2/11/2024 H2S (ppm) 100 Date 6/15/2021 Comment Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft)Type Com 8,122.6 8,356.8 4,088.5 4,096.9 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 8,547.8 8,619.8 4,100.0 4,098.8 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 8,800.2 9,150.3 4,092.4 4,083.2 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 9,535.5 9,648.6 4,072.1 4,067.7 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 9,798.4 9,950.4 4,059.4 4,054.3 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 10,221.5 11,252.1 4,049.1 4,022.1 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 11,637.1 12,900.9 4,035.5 4,017.0 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 13,296.4 13,610.3 4,006.2 3,996.3 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide MULTIPLE LATERALS, 1H-103, 3/8/2024 10:59:18 AM Vertical schematic (actual) LINER; 7,761.0-13,654.8 SLOTS; 13,296.4-13,610.3 SLOTS; 11,637.1-12,900.9 SLOTS; 10,221.5-11,252.1 SLOTS; 9,798.4-9,950.4 SLOTS; 9,535.5-9,648.5 SLOTS; 8,800.2-9,150.3 SLOTS; 8,547.8-8,619.8 SLOTS; 8,122.6-8,356.8 INTERMEDIATE; 37.8-8,112.1 L1 LINER; 7,606.7-15,031.9 L2 LINER; 7,443.3-14,133.3 L3 LINER; 7,216.2-14,903.7 L4 LINER; 6,892.4-14,437.1 NIPPLE; 6,826.0 Seal Assembly; 6,768.1 Nipple - X; 6,715.3 Mandrel – INJ; 6,653.8 Mandrel – GAS LIFT; 5,777.8 Mandrel – GAS LIFT; 3,810.5 Mandrel – GAS LIFT; 2,583.6 SURFACE; 40.6-1,876.7 CONDUCTOR; 38.9-119.0 Hanger; 35.4 KUP PROD 1H-103 ... WELLNAME WELLBORE1H-103 TT RR AA NN SS MM II TT TT AA LL FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 330 W. 7 th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: Schlumberger Wireline Backlog – Kuparuk River Unit DATE: 12/19/2023 Transmitted: North Slope, Kuparuk River Unit Via hard drive data drop _1E-17 50-029-20793-00 182116_1E-17_IPROF_16Jan2023 _1E-20 50-029-20895-00 183005_1E-20_LDL_10Jan2023 183005_1E- 20_PlugSettingRecord_20Aug2023 183005_1E-20_PPROF_29Sep2022 183008_1E-20_RBP_25Feb2023 1F-06 50-029-20820-00 182145_1F-06_Perf_11Jul2022 182145_1F-06_TubingCut_20Feb2022 1G-09 50-029-21001-00 183124_1G-09_IPROF_01Jun2022 1G-103 50-029-20824-00 219110_1G-103_RSTWFL_09Nov2022 1G-11 50-029-21008-00 183131_1G-11_LDL_31May2022 1G-13 50-029-21016-00 183140_1G-13_LDL_09Jul2022 1H-102 50-029-23580-00 217097_1H-102_PPROF_02May2022 1H-103 50-029-23593-00 218003_1H-103_PPROF_06May2022 1H-109 50-029-23595-00 218013_1H-119_IPROF_02JUL2023 3of 12 Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com Receipt: Date: Alaska/IT-Support Services GGRE |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512 T38329 T38330 T38331 T38332 T38333 T38334 T38335 T38336 T38337 T38338 2/29/2024 1H-103 50-029-23593-00 218003_1H-103_PPROF_06May2022 Kayla Junke Digitally signed by Kayla Junke Date: 2024.02.29 11:29:27 -09'00' CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Al Hansen To:Regg, James B (OGC); Brooks, Phoebe L (OGC); DOA AOGCC Prudhoe Bay Cc:Company Man, Nordic 3 Subject:KUP 1H-103 2-7-24 AOGCC Date:Friday, February 9, 2024 9:19:20 AM Attachments:KUP 1H-103 2-7-24 AOGCC.xlsx Al Hansen Rig Manager Rig 3 907-440-6928 Cell This information is intended only for the use of the individual (s) or entity (ies) named above and may contain confidential or privileged information. Any unauthorized disclosure, copying, distribution or the taking of any action in reliance on the contents of this transmitted information is strictly prohibited. If you are not the intended recipient or have received this transmission in error, please immediately delete it and any attachments from your system and send me an email confirming that you have not disclosed, copied, or distributed this message and that you have deleted this message and any attachments from your system. .58+ 37' STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* SSub m itt to :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Rig Owner: Rig No.:3 DATE: 2/7/24 Rig Rep.: Rig Email: Operator: Operator Rep.: Op. Rep Email: Well Name:PTD #22180030 Sundry #323-668 Operation: Drilling: Workover: xxx Explor.: Test: Initial: xxx Weekly: Bi-Weekly: Other: Rams:250/2500 Annular:250/2500 Valves:250/2500 MASP:1206 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result/Type Test Result Quantity Test Result Housekeeping P Well Sign P Upper Kelly 1P Permit On Location P Hazard Sec.P Lower Kelly 1P Standing Order Posted P Misc.NA Ball Type 1P Test Fluid Water Inside BOP 1P FSV Misc 2P BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0NATrip Tank PP Annular Preventer 1 13 5/8"P Pit Level Indicators PP #1 Rams 1 2 7/8" X 5 1/2"FP Flow Indicator PP #2 Rams 1 CSO Rams P Meth Gas Detector PP #3 Rams 0NAH2S Gas Detector PP #4 Rams 0NAMS Misc 0NA #5 Rams 0NA #6 Rams 0NAACCUMULATOR SYSTEM: Choke Ln. Valves 1 3 1/8"P Time/Pressure Test Result HCR Valves 2 3 1/8"P System Pressure (psi)2925 P Kill Line Valves 1 3 1/8"P Pressure After Closure (psi)1700 P Check Valve 0NA200 psi Attained (sec)23 P BOP Misc 2 2 1/16" 5000 P Full Pressure Attained (sec)122 P Blind Switch Covers: All stations Yes CHOKE MANIFOLD:Bottle Precharge:P Quantity Test Result Nitgn. Bottles # & psi (Avg.): 4@1950 P No. Valves 12 P ACC Misc 0NA Manual Chokes 1P Hydraulic Chokes 1P Control System Response Time:Time (sec) Test Result CH Misc 1P Annular Preventer 16 P #1 Rams 4 P Coiled Tubing Only:#2 Rams 5 P Inside Reel valves 0NA #3 Rams NA #4 Rams NA Test Results #5 Rams NA #6 Rams NA Number of Failures:1 Test Time:11.0 HCR Choke 1 P Repair or replacement of equipment will be made within days. HCR Kill 1 P Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 2-5-204 / 19:51 Waived By Test Start Date/Time:2/7/2024 0:00 (date) (time)Witness Test Finish Date/Time:2/7/2024 11:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Kam StJohn Nordic Tested Components with 3 1/2" & 4 1/2" Test Joint.2 7/8" X 5 1/2" VBR's Failed Changed out VBR Packers Retest Pass Hansen/Twedt CPAI Barr/Pickworth KRU 1H-103 Test Pressure (psi): gmanager.rig3@nordic-calista.co c3.Companyman@conocophillips Form 10-424 (Revised 08/2022) 2024-0207_BOP_Nordic3_KRU_1H-103 9 9 9 9 9 9 9 9 9 9 9 9 9 -5HJJ FP VBR's Failed C:\Users\kmjunke\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\H2LGR515\2023-12-10_21175_KRU_1H-103_CaliperSurvey_LogData_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 21175 KRU 1H-103 50-029-23593-00 Caliper Survey w/ Log Data 10-Dec-23 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM PTD: 218-003 T38245 12/28/2023 Kayla Junke Digitally signed by Kayla Junke Date: 2023.12.28 14:59:37 -09'00' 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Pull/Replace Tubing 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number): 10. Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 13710'None Casing Collapse Structural Conductor Surface Intermediate Production Liner Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng (907) 265-6312 Senior RWO/CTD Engineer KRU 1H-103 3995' 13710' 3995' 1206 psi None N/A Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: sydney.long@conocophillips.com AOGCC USE ONLY Tubing Grade: Tubing MD (ft): 7761' MD and 4030' TVD N/A Sydney Long STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025638, ADL0025639 218-003 P.O. Box 100360, Anchorage, AK 99510 50-029-23593-00-00 Kuparuk River Field West Sak Oil Pool ConocoPhillips Alaska, Inc. Length Size Proposed Pools: PRESENT WELL CONDITION SUMMARY West Sak Oil Pool TVD Burst 6805' MD 119' 1770' 4088' 119' 1877' 20" 10-3/4" 80' 7-5/8"8074' 1836' 8112' Slots: 8123-8357', 8548-8620', 8800-9150', 9535-9649', 9798- 9950', 10221-11252', 11637- 12901', 13296-13610' 4-1/2" Slots: 4088-4097', 4100-4099', 4092-4083' 4072-4068', 4059- 4054', 4049-4022', 4035-4017', 4006-3996' Perforation Depth TVD (ft): 1/10/2024 13655'5894' 4-1/2" 3995' Packer: Baker HRD-E ZXP LT Packer SSSV: None Perforation Depth MD (ft): L-80 Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov  By Grace Christianson at 12:39 pm, Dec 13, 2023 323-668 SFD 12/20/2023 DSR-12/14/23 X BOP test to 2500 psig Annular preventer test to 2500 psig VTL 01/04/2023 X 10-404 *&:JLC 1/4/2024 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2024.01.04 13:54:26 -09'00'01/04/24 RBDMS JSB 010924 P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 December 13, 2023 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits an Application for Sundry Approval to work over West Sak Producer 1H-103 (PTD# 218-003). Well 1H-103 was drilled in 2018 as a gas lift producer of the West Sak. Tubing by IA communication was discovered recently after failing a TIFL. Holes in the tubing were confirmed by a caliper log. This well has become a workover candidate. A vertical wellhead configuration is also an objective of the workover to mitigate corrosion concerns. The tubing will be pulled from seals, a new wellhead will be put on the well, then a new 4.5" completion will be run. If you have any questions or require any further information, please contact me at 907-265-6321. Sydney Long Senior Rig Workover Engineer CPAI Drilling and Wells 1H-103 West Sak Producer Pull and Replace Tubing Procedure PTD: 218-003 Page 1 of 2 PPre-Rig Work 1. CMIT to 2,500 PSI - Complete 2. T-PPPOT and T-POT tests. 3. Obtain new SIBHP 4. Set plug at 6,826’ RKB in DB Nipple. Test as barrier. a. Note, if unable to pressure test plug, RWO will proceed without deep plug 5. Dummy off upper GLMs and leave deepest GLM open for circulations 6. Prepare well within 48 hrs of rig arrival. Rig Work MIRU 1. MIRU Nabors Nordic 3 on 1H-103. (No BPV will be installed pre-rig due to internal risk assessment for Nordic 3.) 2. Record shut-in pressures on the T & IA. If there is pressure, bleed off IA and/or tubing pressure and complete 30-minute NFT. Verify well is dead. Circulate KWF as needed. 3. Set BPV and confirm as barrier if needed, ND Tree, NU BOPE and test to 250/2,500 psi. Test annular 250/2,500 psi. Retrieve Tubing 4. Pull BPV, MU landing joint and BOLDS. 5. Pull 4-1/2” tubing down to seals. Install New Wellhead 6. RIH with DP and set G-plug and/or storm packer. Test same to confirm as barrier. 7. ND BOPs. ND horizontal wellhead tubing spool. NU new vertical tubing spool. NU BOPs. Test same. 8. Pull plugs/storm packers from wellbore. Circulate out packer gas as needed. Install new 4-½” Tubing 9. MU 4 ½” completion with seals, gauge, nipples, Chem Injection, and GLMs. 10. RIH with completion. Once on depth, sting into SBE. 11. Space out as needed. Circulate CI brine at opportune time. Land tubing and RILDS. Test packoffs. 12. Pressure test tubing to 3000 psi for 30 minutes and chart. a. Ball and rod will be utilized if no deep plug is installed 13. Pressure test inner annulus to 2500 psi for 30 minutes on chart. ND BOP, NU Tree 14. Confirm pressure tests, then shear out SOV with pressure differential. 15. Install BPV. Test BPV as needed. 16. ND BOPE. NU tree. 17. Pull BPV, freeze protect well if necessary. 18. RDMO. 1H-103 West Sak Producer Pull and Replace Tubing Procedure PTD: 218-003 Page 2 of 2 PPost-Rig Work 19. Pull all plugs from tubing string and install GLD. 20. Turn over to operations. General Well Information: Estimated Start Date: 1/15/2024 Current Operations: Online Well Type: Producer Wellhead Type: VetcoGray MB222A 5M BOP Configuration: Annular / Pipe Rams / Blind Rams Static BHP: 1,556 PSI at 3,500’ TVD on 7/4/2022 MPSP: 1,206 psi using 0.1 psi/ft gradient Scope of Work: Pull the existing 4-1/2” completion from seals. Change wellhead to a vertical configuration. Run new 4-1/2” completion and engage seals. Personnel: Workover Engineer: Sydney Long (265-6321 / Sydney.Long@conocophillips.com) Reservoir Surv. Engineer: Marina Krysinski Production Engineer: Will Parker 1H-103 Proposed RWO Completion COMPLETION INFO MD (ft RKB) TVD (ft RKB) OD (in) Nom. ID (in) Weight (lb/ft)Grade Thread (top) Thread (btm) Conductor 119 119 20 19.12 78.7 B Welded Welded Surface 1876 1770 10.75 9.95 45.5 L80 HYD563 HYD563 Production 8112 4088 7.625 6.88 29.7 L80 HYD563 HYD563 Laterals 13654 3995 4.5 4 11.6 L80 TXP TXP Tubing 6804 3797 4.5 3.96 12.6 L80 HYD563 HYD563 PROPOSED COMPLETION 4-1/2" 12.6# L-80 Hyd 563 Tubing to surface 4-1/2" Camco KBMG gas lift mandrels @ TBD Gauge Mandrel (TEC wire with Clamps to Surface) Chem Injection Mandrel (1/4" Line to Surface) 3.813" X-Nipple 4-1/2" Seals REMAINING COMPLETION LEFT IN HOLE ZXPN Liner Top Packer (6291' RKB) Seal Bore Extension. 4.750" ID (6325' RKB) West Sak Laterals Production Casing Conductor West Sak Liners/Laterals Surface Casing Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By LAST TAG:1H-103 jennalt Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason: ANNOTATE TUBING LEAK 1H-103 12/11/2023 condijw Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread CONDUCTOR 20 19.12 38.9 119.0 119.0 94.00 B SURFACE 10 3/4 9.95 40.6 1,876.7 1,770.2 45.50 L-80 Hydril 563 INTERMEDIATE 7 5/8 6.88 37.8 8,112.1 4,088.2 29.70 L-80 Hyd 563 LINER 4 1/2 4.00 7,761.0 13,654.8 3,995.4 12.60 L-80 SLHT Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string Top (ftKB) 33.2 Set Depth … 6,804.8 Set Depth … 3,797.4 String Max No… 4 1/2 Tubing Description Tubing – Production Wt (lb/ft) 12.60 Grade L80 Top Connection H563 ID (in) 3.96 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 33.2 33.2 0.00 Hanger 10.875 Vetco Grey offset hanger w/ false bowl (w/ bowl 13.375" OD) Vault MB222A offset 3.958 2,674.1 2,302.6 55.40 Mandrel 4.500 Camco 4-1/2" x1" KBMG Mandrel SN 21887-08 Camco KBMG 3.867 4,615.8 3,201.8 71.40 Mandrel 4.500 Camco 4-1/2" x1" KBMG Mandrel SN 21887-05 Camco KBMG 3.867 5,797.2 3,560.2 74.10 Mandrel 4.500 Camco 4-1/2" x1" KBMG Mandrel SOV SN 21887-04 Camco KBMG 3.867 6,657.6 3,761.9 76.57 Sleeve - Sliding 5.480 Baker GOT Nexa-2 CMU with 3.812" DB Baker GOT Nesa-2 CMU 3.813 6,716.4 3,775.8 75.99 Gauge Mandrel 5.500 HES 4 1/2" gauge SN 103094210 HES Gauge 3.958 6,776.9 3,790.6 75.87 Locator 5.480 Baker 5 1/2" Locator Baker Locator 3.958 6,778.8 3,791.0 75.87 Seal Assembly 4.740 Baker 4.75" GBH-22 Seal Assembly 192-47 w/ spacer tubes. 11' From fully located Baker 192-47 Seal Assembl y 3.860 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in) 6,754.0 3,785.0 75.89 LEAK HOLE IN TBG AT 6754', PER CALIPER LOG 12/10/23 12/10/2023 3.980 Mandrel Inserts : excludes pulled inserts Top (ftKB) Top (TVD) (ftKB) Top Incl (°) St ati on No /S Serv Valve Type Latch Type OD (in) TRO Run (psi) Run Date Com Make Model Port Size (in) 2,674.1 2,302.6 55.40 1 GAS LIFT GLV BK 1 1,406.0 6/29/2022 Camco KBMG 0.125 4,615.8 3,201.8 71.40 2 GAS LIFT GLV BK 1 1,497.0 6/29/2022 Camco KBMG 0.188 5,797.2 3,560.2 74.10 3 GAS LIFT OV BK 1 0.0 12/8/2023 Camco KBMG 0.375 Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 7,761.0 4,030.5 75.94 PACKER 5.500 Baker HRD-E ZXP 5.5" x 7.63" Flex-Lock Liner top packer TOP @ 7762.77 Baker PN: H296- 45-0131, Control # 106296350- 01 4.880 7,780.9 4,035.3 75.92 NIPPLE 5.500 Baker 5.5" "RS" Packoff Seal Nipple 17# L-80 Hyd 563 box x box Baker PN: H294- 01-0656, Control # 103296385- 03 4.880 7,813.2 4,043.2 75.88 XO 5.500 5.5" Hyd 563 15.5 # box x 4.5" 12.6# TXP- pin Crossover 3.930 8,638.4 4,098.4 91.31 SWELL PACKER 6.340 Baker 6.0" OD Swell Packer #6 SN: 052826-001-36 Baker PN H301-87 -0397, SN: 052826-001 -36 3.970 8,776.4 4,093.7 93.01 SWELL PACKER 6.340 Baker 6.0" OD Swell Packer #5 SN: 052826-001-33 Baker PN H301-87 -0397, SN: 052826-001 -33 3.970 9,169.0 4,082.9 90.79 SWELL PACKER 6.340 Baker 6.0" OD Swell Packer #4 SN: 052826-001-18 Baker PN H301-87 -0397, SN: 052826-001 -18 3.970 9,511.8 4,073.2 93.01 SWELL PACKER 6.340 Baker 6.0" OD Swell Packer #3 SN: 052826-001-27 Baker PN H301-87 -0397, SN: 052826-001 -27 3.970 11,270.7 4,021.5 91.85 SWELL PACKER 6.340 Baker 6.0" OD Swell Packer #2 SN:052826-001-40 Baker PN H301-87 -0397, SN: 052826-001 -40 3.970 11,613.5 4,033.6 85.04 SWELL PACKER 6.340 Baker 6.0" OD Swell Packer #1 SN: 052826-001-13 Baker PN H301-87 -0397, SN: 052826-001 -13 3.970 MULTIPLE LATERALS, 1H-103, 12/11/2023 9:09:22 AM Vertical schematic (actual) LINER; 7,761.0-13,654.8 SLOTS; 13,296.4-13,610.3 SLOTS; 11,637.1-12,900.9 SLOTS; 10,221.5-11,252.1 SLOTS; 9,798.4-9,950.4 SLOTS; 9,535.5-9,648.5 SLOTS; 8,800.2-9,150.3 SLOTS; 8,547.8-8,619.8 SLOTS; 8,122.6-8,356.8 INTERMEDIATE; 37.8-8,112.1 L1 LINER; 7,606.7-15,031.9 L2 LINER; 7,443.3-14,133.3 L3 LINER; 7,216.2-14,903.7 L4 LINER; 6,892.4-14,437.1 NIPPLE; 6,826.0 Seal Assembly; 6,778.8 LEAK; 6,754.0 Sleeve - Sliding; 6,657.6 Mandrel; 5,797.2 Mandrel; 4,615.8 Mandrel; 2,674.1 SURFACE; 40.6-1,876.7 CONDUCTOR; 38.9-119.0 Hanger; 33.2 KUP PROD KB-Grd (ft) 39.03 RR Date 5/4/2018 Other Elev… 1H-103 ... TD Act Btm (ftKB) 13,710.0 Well Attributes Field Name WEST SAK Wellbore API/UWI 500292359300 Wellbore Status PROD Max Angle & MD Incl (°) 94.46 MD (ftKB) 13,280.96 WELLNAME WELLBORE1H-103 Annotation LAST WO: End Date 6/23/2022 H2S (ppm) 100 Date 6/15/2021 Comment Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft)Type Com 8,122.6 8,356.8 4,088.5 4,096.9 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 8,547.8 8,619.8 4,100.0 4,098.8 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 8,800.2 9,150.3 4,092.4 4,083.2 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 9,535.5 9,648.6 4,072.1 4,067.7 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 9,798.4 9,950.4 4,059.4 4,054.3 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 10,221.5 11,252.1 4,049.1 4,022.1 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 11,637.1 12,900.9 4,035.5 4,017.0 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 13,296.4 13,610.3 4,006.2 3,996.3 WS A2, 1H-103 3/26/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide MULTIPLE LATERALS, 1H-103, 12/11/2023 9:09:23 AM Vertical schematic (actual) LINER; 7,761.0-13,654.8 SLOTS; 13,296.4-13,610.3 SLOTS; 11,637.1-12,900.9 SLOTS; 10,221.5-11,252.1 SLOTS; 9,798.4-9,950.4 SLOTS; 9,535.5-9,648.5 SLOTS; 8,800.2-9,150.3 SLOTS; 8,547.8-8,619.8 SLOTS; 8,122.6-8,356.8 INTERMEDIATE; 37.8-8,112.1 L1 LINER; 7,606.7-15,031.9 L2 LINER; 7,443.3-14,133.3 L3 LINER; 7,216.2-14,903.7 L4 LINER; 6,892.4-14,437.1 NIPPLE; 6,826.0 Seal Assembly; 6,778.8 LEAK; 6,754.0 Sleeve - Sliding; 6,657.6 Mandrel; 5,797.2 Mandrel; 4,615.8 Mandrel; 2,674.1 SURFACE; 40.6-1,876.7 CONDUCTOR; 38.9-119.0 Hanger; 33.2 KUP PROD 1H-103 ... WELLNAME WELLBORE1H-103 Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By LAST TAG:1H-103L1 jennalt Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason:MULTI LAT 1H-103L1 5/31/2018 jennalt Notes: General & Safety Annotation End Date Last Mod By NOTE:jennalt Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread L1 LINER 4 1/2 3.96 7,606.7 15,031.9 3,883.6 12.60 L-80 TXP-m Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string Top (ftKB) 7,545.0 Set Depth … 7,805.4 Set Depth … 4,028.0 String Max No… 4 1/2 Tubing Description Tubing – Production Wt (lb/ft) 12.60 Grade L-80 Top Connection TXP-m BTC ID (in) 3.96 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 7,545.0 3,977.8 75.84 PACKER 6.550 Baker ZXP Liner Top Packer 5.5" x 7.63", 5-1/2" H563 Baker PN H296 -45- 0131, CN 1062950 87-01 4.920 7,565.0 3,982.6 75.87 SBE 6.250 Baker 190-47 Seal Bore Extension, 5-1/2" Baker PN H02- 43317- A1, WO 5170088 6 4.750 7,584.6 3,987.4 75.87 XO 5.500 Reducing Crossover sub 5½" Hyd 563 X 4-1/2" TXP CPAI MM# 1371754 1 3.950 7,603.5 3,992.1 75.86 Triple connect bushing 6.600 Baker 4.5" x 7.63"LEM #1 (Above Hook hanger) SN # 106290791-01 Baker PN H289 -18- 0036, CN 1062907 91-01 3.710 7,606.7 3,992.8 75.86 Triple connect bushing 6.600 Baker 4.5" x 7.63" LEM #1 (Below Hook Hanger @ 7606.69) Baker PN H289 -18- 0036, CN 1062907 91-01 3.688 7,749.9 4,021.0 81.41 NIPPLE 5.200 Camco 4-1/2" x 3.563" DB-6 Nipple, IBT-m box x pin SN# N15N1150 Camco DB 6 SN N15N11 50 3.563 7,802.1 4,027.7 83.98 SEAL ASSY 4.500 Baker 190-47 GBH-22, 4-1/2", L-80 Stright Non-Locating Seal Assy Baker PN H453 -01- 0033, CN 1063006 16 SN02 3.890 Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 7,728.6 4,017.7 80.50 SWELL PACKER 5.990 Baker 6.0" OD Swell Packer #9 "II" SN:054009-010-4 Baker PN: H301- 87-0450, SN:054009- 010-4 3.958 8,522.8 4,041.3 89.28 SWELL PACKER 5.970 Baker 6.0" OD Swell Packer #8 "HH" SN: 054007-010-18 Baker PN: H301- 87-0450, SN: 054007 -010-18 3.958 8,742.6 4,040.4 90.56 SWELL PACKER 5.980 Baker 6.0" OD Swell Packer #7 "GG" SN: 054009-010-12 Baker PN: H301- 87-0450, SN: 054009 -010-12 3.958 9,089.6 4,032.0 90.91 SWELL PACKER 5.960 Baker 6.0" OD Swell Packer #6 "FF" SN: 054007-010-5 Baker PN: H301- 87-0450, SN: 054007 -010-5 3.958 9,557.9 4,007.8 94.21 SWELL PACKER 5.960 Baker 6.0" OD Swell Packer #5 "EE" SN: 054009-010-13 Baker PN: H301- 87-0450, SN: 054009 -010-13 3.958 11,207.2 3,973.4 91.40 SWELL PACKER 5.970 Baker 6.0" OD Swell Packer #4 "DD" SN: 054009-010-9 Baker PN: H301- 87-0450, SN: 054009 -010-9 3.958 11,389.3 3,977.4 86.88 SWELL PACKER 6.000 Baker 6.0" OD Swell Packer #3 "CC" SN: 054009-010-7 Baker PN: H301- 87-0450, SN: 054009 -010-7 3.958 12,277.2 3,953.7 93.28 SWELL PACKER 6.000 Baker 6.0" OD Swell Packer #2 "BB" SN: 054009-010-6 Baker PN: H301- 87-0450, SN:054009- 010-6 3.958 12,705.2 3,923.9 96.11 SWELL PACKER 5.980 Baker 6.0" OD Swell Packer #1 "AA" SN: 054007-010-24 Baker PN: H301- 87-0450, SN:054007- 010-24 3.980 MULTIPLE LATERALS, 1H-103L1, 12/13/2023 10:12:10 AM Vertical schematic (actual) L1 LINER; 7,606.7-15,031.9 SLOTS; 12,711.0-14,989.6 SLOTS; 11,395.3-12,263.1 SLOTS; 10,094.0-11,193.1 SLOTS; 9,563.9-9,892.3 SLOTS; 8,748.7-9,075.5 SLOTS; 7,734.6-8,508.7 NIPPLE; 7,749.9 INTERMEDIATE; 37.8-8,112.1 L2 LINER; 7,443.3-14,133.3 L3 LINER; 7,216.2-14,903.7 L4 LINER; 6,892.4-14,437.1 NIPPLE; 6,826.0 Seal Assembly; 6,778.8 LEAK; 6,754.0 Sleeve - Sliding; 6,657.6 Mandrel; 5,797.2 Mandrel; 4,615.8 Mandrel; 2,674.1 SURFACE; 40.6-1,876.7 CONDUCTOR; 38.9-119.0 Hanger; 33.2 KUP PROD KB-Grd (ft) 39.03 RR Date 5/4/2018 Other Elev… 1H-103L1 ... TD Act Btm (ftKB) 15,103.0 Well Attributes Field Name WEST SAK Wellbore API/UWI 500292359360 Wellbore Status PROD Max Angle & MD Incl (°) 96.31 MD (ftKB) 12,754.99 WELLNAME WELLBORE1H-103 Annotation LAST WO: End Date 6/23/2022 H2S (ppm) 100 Date 6/15/2021 Comment Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft)Type Com 7,734.6 8,508.7 4,018.7 4,041.1 WS A3, 1H- 103L1 4/3/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 8,748.7 9,075.5 4,040.3 4,032.3 WS A3, 1H- 103L1 4/3/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 9,563.9 9,892.3 4,007.4 4,004.9 WS A3, 1H- 103L1 4/3/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 10,094.0 11,193.1 4,000.2 3,973.7 WS A3, 1H- 103L1 4/3/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 11,395.3 12,263.1 3,977.7 3,954.5 WS A3, 1H- 103L1 4/3/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 12,711.0 14,989.6 3,923.3 3,883.2 WS A3, 1H- 103L1 4/3/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide MULTIPLE LATERALS, 1H-103L1, 12/13/2023 10:12:11 AM Vertical schematic (actual) L1 LINER; 7,606.7-15,031.9 SLOTS; 12,711.0-14,989.6 SLOTS; 11,395.3-12,263.1 SLOTS; 10,094.0-11,193.1 SLOTS; 9,563.9-9,892.3 SLOTS; 8,748.7-9,075.5 SLOTS; 7,734.6-8,508.7 NIPPLE; 7,749.9 INTERMEDIATE; 37.8-8,112.1 L2 LINER; 7,443.3-14,133.3 L3 LINER; 7,216.2-14,903.7 L4 LINER; 6,892.4-14,437.1 NIPPLE; 6,826.0 Seal Assembly; 6,778.8 LEAK; 6,754.0 Sleeve - Sliding; 6,657.6 Mandrel; 5,797.2 Mandrel; 4,615.8 Mandrel; 2,674.1 SURFACE; 40.6-1,876.7 CONDUCTOR; 38.9-119.0 Hanger; 33.2 KUP PROD 1H-103L1 ... WELLNAME WELLBORE1H-103 Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By LAST TAG:1H-103L2 jennalt Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason:MULTI LAT 1H-103L2 5/31/2018 jennalt Notes: General & Safety Annotation End Date Last Mod By NOTE:jennalt Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread L2 LINER 4 1/2 3.96 7,443.3 14,133.3 3,881.1 12.60 L-80 TXP-m Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string Top (ftKB) 7,299.0 Set Depth … 7,578.6 Set Depth … 3,974.1 String Max No… 4 1/2 Tubing Description Tubing – Production Wt (lb/ft) 12.60 Grade L-80 Top Connection TXP-m BTC ID (in) 3.96 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 7,299.0 3,917.6 75.96 PACKER 6.560 Baker ZXP Liner Top Packer 5.5" x 7.63", 5-1/2" H563 Baker PN H296 -45- 0131, CN 1062950 87-02 4.900 7,318.9 3,922.5 75.95 SBE 6.250 Baker 190-47 Seal Bore Extension, 5-1/2" Baker PN H02- 43317- A1, WO 5170088 6 4.750 7,338.6 3,927.2 75.94 XO 5.500 Reducing Crossover sub 5½" Hyd 563 X 4-1/2" TXP CPAI MM# 1371754 1 3.950 7,440.1 3,952.0 75.81 Triple connect bushing 6.600 Baker 4.5" x 7.63"LEM #2 (Above Hook hanger) SN # 106290368-01 Baker PN H289 -18- 0037, CN 1062903 68-01 3.710 7,443.3 3,952.8 75.81 Triple connect bushing 6.600 Baker 4.5" x 7.63" LEM #2 (Below Hook Hanger @ 7443.29) Baker PN H289 -18- 0037, CN 1062903 68-01 3.688 7,575.4 3,973.8 85.39 SEAL ASSY 4.500 Baker 190-47 GBH-22, 4-1/2", L-80 Stright Non-Locating Seal Assy Baker PN H453 -01- 0033, CN 1063006 16 SN03 3.870 Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 7,565.5 3,973.0 84.78 SWELL PACKER 6.050 Baker 6.0" OD Swell Packer #5 "PP" SN: 054009-010-17 Baker PN: H301- 87-0450, SN: 054009 -010-17 3.930 9,105.0 3,965.9 91.81 SWELL PACKER 5.990 Baker 6.0" OD Swell Packer #4 "OO" SN: 054009-010-22 Baker PN: H301- 87-0450, SN: 054009 -010-22 3.950 9,533.9 3,943.5 94.14 SWELL PACKER 5.970 Baker 6.0" OD Swell Packer #3 "MM" SN: 054009-010-5 Baker PN: H301- 87-0450, SN: 054009 -010-5 3.950 11,158.8 3,914.2 86.69 SWELL PACKER 6.000 Baker 6.0" OD Swell Packer #2 "LL" SN: 054007-010-17 Baker PN: H301- 87-0450, SN: 054007 -010-17 3.930 11,318.8 3,926.7 86.09 SWELL PACKER 6.000 Baker 6.0" OD Swell Packer #1 "KK" SN: 054009-010-19 Baker PN: H301- 87-0450, SN:054009- 010-19 3.950 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft)Type Com 7,830.9 9,090.9 3,976.7 3,966.3 WS A4, 1H- 103L2 4/12/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 9,539.9 11,144.7 3,943.0 3,913.5 WS A4, 1H- 103L2 4/12/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 11,324.8 12,182.2 3,927.1 3,904.6 WS A4, 1H- 103L2 4/12/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 12,386.1 14,091.6 3,902.0 3,881.1 WS A4, 1H- 103L2 4/12/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide MULTIPLE LATERALS, 1H-103L2, 12/13/2023 10:12:12 AM Vertical schematic (actual) L2 LINER; 7,443.3-14,133.3 SLOTS; 12,386.1-14,091.6 SLOTS; 11,324.8-12,182.2 SLOTS; 9,539.9-11,144.7 SLOTS; 7,830.9-9,090.9 INTERMEDIATE; 37.8-8,112.1 L3 LINER; 7,216.2-14,903.7 L4 LINER; 6,892.4-14,437.1 NIPPLE; 6,826.0 Seal Assembly; 6,778.8 LEAK; 6,754.0 Sleeve - Sliding; 6,657.6 Mandrel; 5,797.2 Mandrel; 4,615.8 Mandrel; 2,674.1 SURFACE; 40.6-1,876.7 CONDUCTOR; 38.9-119.0 Hanger; 33.2 KUP PROD KB-Grd (ft) 39.03 RR Date 5/4/2018 Other Elev… 1H-103L2 ... TD Act Btm (ftKB) 14,165.0 Well Attributes Field Name WEST SAK Wellbore API/UWI 500292359361 Wellbore Status PROD Max Angle & MD Incl (°) 94.19 MD (ftKB) 9,454.49 WELLNAME WELLBORE1H-103 Annotation LAST WO: End Date 6/23/2022 H2S (ppm) 100 Date 6/15/2021 Comment Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By LAST TAG:1H-103L3 jennalt Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason:MULTI LAT 1H-103L3 5/31/2018 jennalt Notes: General & Safety Annotation End Date Last Mod By NOTE:jennalt Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread L3 LINER 4 1/2 3.96 7,216.2 14,903.7 3,830.5 12.60 L-80 IBT-m Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string Top (ftKB) 7,031.2 Set Depth … 7,331.9 Set Depth … 3,917.1 String Max No… 4 1/2 Tubing Description Tubing – Production Wt (lb/ft) 12.60 Grade L-80 Top Connection TXP-m BTC ID (in) 3.96 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 7,031.2 3,852.5 75.92 PACKER 6.560 Baker ZXP Liner Top Packer 5.5" x 7.63", 5-1/2" H563 Baker PN H296 -45- 0131, CN 1062963 84-02 4.900 7,051.1 3,857.4 75.93 SBE 6.240 Baker 190-47 Seal Bore Extension, 5-1/2" Baker PN H02- 43317- A1, WO 5170088 6 4.750 7,070.8 3,862.1 75.95 XO 5.500 Reducing Crossover sub 5½" Hyd 563 X 4-1/2" TXP CPAI MM# 1371754 1 3.950 7,213.1 3,896.8 75.88 Triple connect bushing 5.600 Baker 4.5" x 7.63"LEM #2 (Above Hook hanger) SN # 106291207-01 Baker PN H289 -18- 0038, CN 1062912 07-01 3.710 7,216.3 3,897.5 75.89 Triple connect bushing 6.620 Baker 4.5" x 7.63" LEM #2 (Below Hook Hanger @ 7216.2') Baker PN H289 -18- 0038, CN 1062912 07-01 3.688 7,328.7 3,916.8 84.48 SEAL ASSY 4.500 Baker 190-47 GBH-22, 4-1/2", L-80 Stright Non-Locating Seal Assy Baker PN H453 -01- 0033, CN 1063006 16 SN04 3.890 Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 7,338.2 3,917.7 85.27 SWELL PACKER 6.000 Baker 6.0" OD Swell Packer #4 "JJ" SN: 054009-010-20 Baker PN: H301- 87-0450, SN: 054009 -010-20 3.950 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft)Type Com 7,354.0 8,986.1 3,918.8 3,921.0 WS B, 1H-103L3 4/21/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 9,102.2 10,980.0 3,916.2 3,869.7 WS B, 1H-103L3 4/21/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 11,096.3 14,851.0 3,869.6 3,830.1 WS B, 1H-103L3 4/21/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide MULTIPLE LATERALS, 1H-103L3, 12/13/2023 10:12:13 AM Vertical schematic (actual) L3 LINER; 7,216.2-14,903.7 SLOTS; 11,096.3-14,851.0 SLOTS; 9,102.2-10,980.0 SLOTS; 7,354.0-8,986.1 INTERMEDIATE; 37.8-8,112.1 L4 LINER; 6,892.4-14,437.1 NIPPLE; 6,826.0 Seal Assembly; 6,778.8 LEAK; 6,754.0 Sleeve - Sliding; 6,657.6 Mandrel; 5,797.2 Mandrel; 4,615.8 Mandrel; 2,674.1 SURFACE; 40.6-1,876.7 CONDUCTOR; 38.9-119.0 Hanger; 33.2 KUP PROD KB-Grd (ft) 39.03 RR Date 5/4/2018 Other Elev… 1H-103L3 ... TD Act Btm (ftKB) 14,949.0 Well Attributes Field Name WEST SAK Wellbore API/UWI 500292359362 Wellbore Status PROD Max Angle & MD Incl (°) 94.10 MD (ftKB) 9,173.09 WELLNAME WELLBORE1H-103 Annotation LAST WO: End Date 6/23/2022 H2S (ppm) 100 Date 6/15/2021 Comment Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By LAST TAG:1H-103L4 jennalt Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason:MULTI LAT 1H-103L4 5/31/2018 jennalt Notes: General & Safety Annotation End Date Last Mod By NOTE:jennalt Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread L4 LINER 4 1/2 3.96 6,892.4 14,437.1 3,809.0 12.60 L-80 IBT-m Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string Top (ftKB) 6,767.5 Set Depth … 7,062.7 Set Depth … 3,841.4 String Max No… 4 1/2 Tubing Description Tubing – Production Wt (lb/ft) 12.60 Grade L-80 Top Connection TXP-m BTC ID (in) 3.96 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 6,767.5 3,788.3 75.88 PACKER 6.550 Baker ZXP Liner Top Packer 5.5" x 7.63", 5-1/2" H563 Baker PN H296 -45- 0131, Control # 1062963 84/B#13 97804- 01 4.910 6,787.4 3,793.2 75.86 SBE 6.250 Baker 190-47 Seal Bore Extension, 5-1/2" Baker PN#H02 -43317- A1, WO 5170088 6 4.750 6,807.1 3,798.0 75.84 XO 5.500 Reducing Crossover sub 5½" Hyd 563 X 4-1/2" TXP 3.950 6,826.0 3,802.6 75.84 NIPPLE 4.500 Camco 4-1/2" x 3.750" DB-6 Nipple, TXP BTC SN# 4053-5 Camco DB 6 PN 1017426 46, SN# 4053-5 3.750 6,889.2 3,818.0 75.93 Triple connect bushing 5.590 Baker 4.5" x 7.63"LEM #1 (Above Hook hanger) Baker PN: H289-18 -0039, Control # 1062910 54-01, 1389041 3.710 6,892.4 3,818.8 75.94 Triple connect bushing 6.630 Baker 4.5" x 7.63" LEM #1 (Below Hook Hanger) Hook Hanger top @ 6892.35' Baker PN: H289-18 -0039, Control # 1062910 54-01, 1389041 3.688 7,059.5 3,841.3 88.42 SEAL ASSY 4.740 Baker 190-47 GBH-22, 4-1/2", L-80 Stright Non-Locating Seal Assy Baker PN: H453-01 -0033, Control # 1063006 16, SN01 3.880 Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 7,015.8 3,838.8 84.92 SWELL PACKER 6.000 Baker 6.0" OD Swell Packer # "WW" SN: 054007-010-22 Baker 922 Compond, SN: 054007 -010-22 3.990 10,992.2 3,800.7 82.88 SWELL PACKER 6.000 Baker 6.0" OD Swell Packer # "XX" SN: 054007-010-6 Baker 922 Compond, SN: 054007 -010-6 3.980 11,378.6 3,849.3 85.85 SWELL PACKER 6.000 Baker 6.0" OD Swell Packer # "YY" SN: 054007-010-21 Baker 922 Compond, SN: 054007 -010-21 3.980 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft)Type Com 7,031.6 8,978.2 3,840.0 3,839.8 WS D, 1H-103L4 5/1/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 9,093.8 10,968.3 3,833.0 3,797.7 WS D, 1H-103L4 5/1/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide 11,394.4 14,385.4 3,850.3 3,809.4 WS D, 1H-103L4 5/1/2018 32.0 SLOTS 4 x rows per foot w/ 8 slots per row - each slot is 3" long x 1/8" wide MULTIPLE LATERALS, 1H-103L4, 12/13/2023 10:12:13 AM Vertical schematic (actual) L4 LINER; 6,892.4-14,437.1 SLOTS; 11,394.4-14,385.4 SLOTS; 9,093.8-10,968.2 SLOTS; 7,031.6-8,978.2 INTERMEDIATE; 37.8-8,112.1 NIPPLE; 6,826.0 Seal Assembly; 6,778.8 LEAK; 6,754.0 Sleeve - Sliding; 6,657.6 Mandrel; 5,797.2 Mandrel; 4,615.8 Mandrel; 2,674.1 SURFACE; 40.6-1,876.7 CONDUCTOR; 38.9-119.0 Hanger; 33.2 KUP PROD KB-Grd (ft) 39.03 RR Date 5/4/2018 Other Elev… 1H-103L4 ... TD Act Btm (ftKB) 14,501.0 Well Attributes Field Name WEST SAK Wellbore API/UWI 500292359363 Wellbore Status PROD Max Angle & MD Incl (°) 94.97 MD (ftKB) 8,697.57 WELLNAME WELLBORE1H-103 Annotation LAST WO: End Date 6/23/2022 H2S (ppm) 100 Date 6/15/2021 Comment C:\Users\kmjunke\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\H2LGR515\2023-10-19_22133_KRU_1H-103_CaliperSurvey_LogData_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 22133 KRU 1H-103 50-029-23593-00 Caliper Survey w/ Log Data 19-Oct-23 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM PTD: 218-003 T38104 10/26/2023 Kayla Junke Digitally signed by Kayla Junke Date: 2023.10.26 09:18:45 -08'00' C:\Users\kmjunke\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\H2LGR515\2023-08-26_22556_KRU_1H-103_CaliperSurvey_LogData_Transmittal.docx.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 22556 KRU 1H-103 50-029-23593-00 Caliper Survey w/ Log Data 26-Aug-23 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM PTD: 218-003 T37970 8/31/2023 Kayla Junke Digitally signed by Kayla Junke Date: 2023.08.31 13:47:00 -08'00' C:\Users\kmjunke\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\99RGP1KB\2023-06-29_22148_1H-103_CaliperSurvey_LogData_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 22148 KRU 1H-103 50-029-23593-00 Caliper Survey w/ Log Data 29-Jun-23 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM PTD: 218-003 T37805 Kayla Junke Digitally signed by Kayla Junke Date: 2023.07.05 13:04:18 -08'00' C:\Users\kmjunke\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\99RGP1KB\2023-05-29_22098_KRU_1H-103_CaliperSurvey_LogData_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 22098 KRU 1H-103 50-029-23593-00 Caliper Survey w/ Data 29-May-23 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM PTD: 218-003 T37695 Kayla Junke Digitally signed by Kayla Junke Date: 2023.06.02 12:50:43 -08'00' C:\Users\kmjunke\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\99RGP1KB\2023-04-12_15915_KRU_1H-103_CaliperSurvey_LogData_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 15915 KRU 1H-103 50-029-23593-00 Caliper Survey w/ Log Data 12-Apr-23 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 12-Apr-23 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM PTD: 218-003 T37608 Kayla Junke Digitally signed by Kayla Junke Date: 2023.04.19 14:25:05 -08'00' C:\Users\mdguhl\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\LCF4WGUY\2022-12-07_15890_KRU_1H-103_CaliperSurvey_LogData_Transmittal.docx DELIVERABLE DISCRIPTION Ticket #Field Well #API #Log Description Log Date 15890 KRU 1H-103 50-029-23593-00 Caliper Survey w/ Log Data 07-Dec-22 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE,INC., 4141 B STREET,SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL :READ-Anchorage@readcasedhole.com WEBSITE :WWW.READCASEDHOLE.COM By Meredith Guhl at 7:40 am, Dec 12, 2022 218-003 T37368 Meredith Guhl Digitally signed by Meredith Guhl Date: 2022.12.12 07:40:35 -09'00' C:\Users\mdguhl\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\LCF4WGUY\2022-11-26_21112_KRU_1H-103_CaliperSurvey_LogData_Transmittal.docx DELIVERABLE DISCRIPTION Ticket #Field Well #API #Log Description Log Date 21112 KRU 1H-103 50-029-23593-00 Caliper Survey W/ Log Data 26-Nov-22 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE,INC., 4141 B STREET,SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL :READ-Anchorage@readcasedhole.com WEBSITE :WWW.READCASEDHOLE.COM By Meredith Guhl at 11:34 am, Nov 29, 2022 218-003 T37331 Meredith Guhl Digitally signed by Meredith Guhl Date: 2022.11.29 11:34:40 -09'00' By Anne Prysunka at 10:57 am, Jul 21, 2022  5HJJ-DPHV% 2*& )URP&R]E\.HOO\.HOO\&R]E\#QDERUVFRP! 6HQW7KXUVGD\-XQH30 7R5HJJ-DPHV% 2*& '2$$2*&&3UXGKRH%D\%URRNV3KRHEH/ 2*& 16.5:2&0 &F+HQVRQ-DPHV+ROFRPE6HDQ+REEV*UHJ6.QHDOH0LFKDHO/ 6XEMHFW1DERUV(6 $WWDFKPHQWV1DERUV(6[OV[ dŚĂŶŬƐ͕ <ĞůůLJŽnjďLJ EĂďŽƌƐůĂƐŬĂƌŝůůŝŶŐ ZŝŐϳ^ZŝŐDĂŶĂŐĞƌ KĨĨŝĐĞϵϬϳͲϲϳϬͲϲϭϯϮ ĞůůϵϬϳͲϳϭϱͲϵϬϱϱ ΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎ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ll BOPE reports are due to the agency within 5 days of testing* SSu b m i tt t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Owner/Contractor: Rig No.:7ES DATE: 6/21/22 Rig Rep.: Rig Phone: 670-6132 Operator: Op. Phone:670-6130 Rep.: E-Mail Well Name: PTD #22180030 Sundry #322-346 Operation: Drilling: Workover: x Explor.: Test: Initial: x Weekly: Bi-Weekly: Other: Rams:250/2500 Annular:250/2500 Valves:250/2500 MASP:1105 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.P Well Sign P Upper Kelly 1P Housekeeping P Rig P Lower Kelly 1P PTD On Location P Hazard Sec.P Ball Type 1P Standing Order Posted P Misc.NA Inside BOP 1P FSV Misc 0NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0NATrip Tank PP Annular Preventer 1 13 5/8" T 90 P Pit Level Indicators PP #1 Rams 1 3 1/2" x 5 1/2"P Flow Indicator PP #2 Rams 1 Blinds P Meth Gas Detector PP #3 Rams 1 2 7/8" x 5"NT H2S Gas Detector PP #4 Rams 0NAMS Misc 0NA #5 Rams 0NA #6 Rams 0NA Quantity Test Result Choke Ln. Valves 1 3 1/8" Gate P Inside Reel valves 0NA HCR Valves 2 3 1/8" Gate FP Kill Line Valves 2 3 1/8" & 2"P Check Valve 0NAACCUMULATOR SYSTEM: BOP Misc 0NA Time/Pressure Test Result System Pressure (psi)3000 P CHOKE MANIFOLD:Pressure After Closure (psi)1600 P Quantity Test Result 200 psi Attained (sec)17 P No. Valves 16 P Full Pressure Attained (sec)95 P Manual Chokes 1P Blind Switch Covers: All stations Yes Hydraulic Chokes 1P Nitgn. Bottles # & psi (Avg.): 5@1907 P CH Misc 0NA ACC Misc 0NA Test Results Number of Failures:1 Test Time:5.0 Hours Repair or replacement of equipment will be made within 0 days. Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 6-19-22 7:53PM Waived By Test Start Date/Time:6/21/2022 3:00 (date) (time)Witness Test Finish Date/Time:6/21/2022 8:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Adam Earl Nabors Kill HCR valve FP grease retest- passed. Tested with 41/2" test jnt. Kelly Cozby / Sean Holcomb ConocoPhillips Mark Adams / L. Toussant KRU 1H-103 Test Pressure (psi): nskrwo.cm@conocophillips.com Form 10-424 (Revised 02/2022) 2022-0621_BOP_Nabors7ES_KRU_1H-103 9 9 9 9 9 9 9 99 9 9 9 9 -5HJJ Kill HCR valve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y Samantha Carlisle at 8:35 am, Jun 09, 2022  ; ; '/%'65 %23 WHVW WR  SVLJ $QQXODU SUHYHQWHU WHVW WR  SVLJ  ; 97/   dts 6/14/2022 JLC 6/14/2022 Jeremy Price Digitally signed by Jeremy Price Date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«  :W/HQ OE«  *UDGH % 7RS&RQQHFWLRQ &DVLQJ'HVFULSWLRQ 685)$&( 2' LQ  ,' LQ  7RS IW.%  6HW'HSWK IW.%  6HW'HSWK 79' «  :W/HQ OE«  *UDGH / 7RS&RQQHFWLRQ +\GULO &DVLQJ'HVFULSWLRQ ,17(50(',$7( 2' LQ  ,' LQ  7RS IW.%  6HW'HSWK IW.%  6HW'HSWK 79' «  :W/HQ OE«  *UDGH / 7RS&RQQHFWLRQ +\G &DVLQJ'HVFULSWLRQ /,1(5 2' LQ  ,' LQ  7RS IW.%  6HW'HSWK IW.%  6HW'HSWK 79' «  :W/HQ OE«  *UDGH / 7RS&RQQHFWLRQ 6/+7 /LQHU'HWDLOVH[FOXGHVOLQHUSXSMRLQWVFDVLQJVXEVKRHIORDW 7RS IW.% 7RS 79' IW.% 7RS,QFO ƒ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±3URGXFWLRQ 6WULQJ«  ,' LQ  7RS IW.%  6HW'HSWK IW«  6HW'HSWK 79'«  :W OEIW  *UDGH / 7RS&RQQHFWLRQ 7;3P &RPSOHWLRQ'HWDLOVH[FOXGHVWXELQJSXSVSDFHRXWWKUHDG5.% 7RS IW.% 7RS 79' IW.% 7RS,QFO ƒ ,WHP'HV 1RPLQDO,' LQ 2' 1RPLQDO LQ 0DNH 0RGHO    +$1*(5   9HWFR*UH\ 0%$RIIVHW *$6/,)7   &DPFR .%0*    *$6/,)7   &DPFR .%0*  *$6/,)7   &DPFR .%0*    6OHHYH6OLGLQJ&08   %DNHU 31+ 32     *$8*(   +(6 31    /2&$725   %DNHU 31&1 61    6($/$66<   %DNHU 31&1 61 2WKHU,Q+ROH :LUHOLQHUHWULHYDEOHSOXJVYDOYHVSXPSVILVKHWF 7RS IW.% 7RS 79'  IW.% 7RS,QFO ƒ 'HV &RP 5XQ'DWH ,' LQ 61    /($.78%,1* /'/21)281'78%,1*/($.6$7     $1'      5%3 335%3:),//(;7(16,21$1' 12*2%27720126( 2$/ 0$; 2'  &33&3 (4  ),6+75$&725:+((//267,1+2/(;  6(($77$&+0(176   0DQGUHO,QVHUWVH[FOXGHVSXOOHGLQVHUWV 6W DWL RQ 1 R7RS IW.% 7RS 79' IW.% 7RS ,QFO ƒ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« +  7' $FW%WP IW.%  :HOO$WWULEXWHV )LHOG1DPH :(676$. :HOOERUH$3,8:,  :HOOERUH6WDWXV 352' 0D[$QJOH 0' ,QFO ƒ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«  :W/HQ OE«  *UDGH / 7RS&RQQHFWLRQ 7;3P /LQHU'HWDLOVH[FOXGHVOLQHUSXSMRLQWVFDVLQJVXEVKRHIORDW 7RS IW.% 7RS 79' IW.% 7RS,QFO ƒ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±3URGXFWLRQ 6WULQJ«  ,' LQ  7RS IW.%  6HW'HSWK IW«  6HW'HSWK 79'«  :W OEIW  *UDGH / 7RS&RQQHFWLRQ 7;3P%7& &RPSOHWLRQ'HWDLOVH[FOXGHVWXELQJSXSVSDFHRXWWKUHDG5.% 7RS IW.% 7RS 79' IW.% 7RS,QFO ƒ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« +/  7' $FW%WP IW.%  :HOO$WWULEXWHV )LHOG1DPH :(676$. :HOOERUH$3,8:,  :HOOERUH6WDWXV 352' 0D[$QJOH 0' ,QFO ƒ  0' IW.%  :(//1$0( :(//%25( $QQRWDWLRQ /$67:2 (QG'DWH+6 SSP 'DWH&RPPHQW /DVW7DJ $QQRWDWLRQ 'HSWK IW.% (QG'DWH :HOOERUH /DVW0RG%\ /$677$*+/MHQQDOW /DVW5HY5HDVRQ $QQRWDWLRQ (QG'DWH :HOOERUH /DVW0RG%\ 5HY5HDVRQ08/7,/$7  +/MHQQDOW &DVLQJ6WULQJV &DVLQJ'HVFULSWLRQ //,1(5 2' LQ  ,' LQ  7RS IW.%  6HW'HSWK IW.%  6HW'HSWK 79' «  :W/HQ OE«  *UDGH / 7RS&RQQHFWLRQ 7;3P /LQHU'HWDLOVH[FOXGHVOLQHUSXSMRLQWVFDVLQJVXEVKRHIORDW 7RS IW.% 7RS 79' IW.% 7RS,QFO ƒ ,WHP'HV &RP 1RPLQDO,' LQ    +$1*(5 %DNHU%)ODQJHGKRRNKDQJHU;,QVLGHFDVLQJ     +$1*(5 %DNHU%)ODQJHGKRRNKDQJHU; %2:#   0'     6:(//3$&.(5 %DNHU2'6ZHOO3DFNHU3361     6:(//3$&.(5 %DNHU2'6ZHOO3DFNHU2261     6:(//3$&.(5 %DNHU2'6ZHOO3DFNHU0061     6:(//3$&.(5 %DNHU2'6ZHOO3DFNHU//61     6:(//3$&.(5 %DNHU2'6ZHOO3DFNHU..61  7XELQJ6WULQJVVWULQJPD[LQGLFDWHV/21*(67VHJPHQWRIVWULQJ 7XELQJ'HVFULSWLRQ 7XELQJ±3URGXFWLRQ 6WULQJ«  ,' LQ  7RS IW.%  6HW'HSWK IW«  6HW'HSWK 79'«  :W OEIW  *UDGH / 7RS&RQQHFWLRQ 7;3P%7& &RPSOHWLRQ'HWDLOVH[FOXGHVWXELQJSXSVSDFHRXWWKUHDG5.% 7RS IW.% 7RS 79' IW.% 7RS,QFO ƒ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« +/  7' $FW%WP IW.%  :HOO$WWULEXWHV )LHOG1DPH :(676$. :HOOERUH$3,8:,  :HOOERUH6WDWXV 352' 0D[$QJOH 0' ,QFO ƒ  0' IW.%  :(//1$0( :(//%25( $QQRWDWLRQ /$67:2 (QG'DWH+6 SSP 'DWH&RPPHQW /DVW7DJ $QQRWDWLRQ 'HSWK IW.% (QG'DWH :HOOERUH /DVW0RG%\ /$677$*+/MHQQDOW /DVW5HY5HDVRQ $QQRWDWLRQ (QG'DWH :HOOERUH /DVW0RG%\ 5HY5HDVRQ08/7,/$7  +/MHQQDOW &DVLQJ6WULQJV &DVLQJ'HVFULSWLRQ //,1(5 2' LQ  ,' LQ  7RS IW.%  6HW'HSWK IW.%  6HW'HSWK 79' «  :W/HQ OE«  *UDGH / 7RS&RQQHFWLRQ ,%7P /LQHU'HWDLOVH[FOXGHVOLQHUSXSMRLQWVFDVLQJVXEVKRHIORDW 7RS IW.% 7RS 79' IW.% 7RS,QFO ƒ ,WHP'HV &RP 1RPLQDO,' LQ    +$1*(5 %DNHU%)ODQJHGKRRNKDQJHU;,QVLGHFDVLQJ     +$1*(5 %DNHU%)ODQJHGKRRNKDQJHU; %2:#   0'     6:(//3$&.(5 %DNHU2'6ZHOO3DFNHU--61  7XELQJ6WULQJVVWULQJPD[LQGLFDWHV/21*(67VHJPHQWRIVWULQJ 7XELQJ'HVFULSWLRQ 7XELQJ±3URGXFWLRQ 6WULQJ«  ,' LQ  7RS IW.%  6HW'HSWK IW«  6HW'HSWK 79'«  :W OEIW  *UDGH / 7RS&RQQHFWLRQ 7;3P%7& &RPSOHWLRQ'HWDLOVH[FOXGHVWXELQJSXSVSDFHRXWWKUHDG5.% 7RS IW.% 7RS 79' IW.% 7RS,QFO ƒ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« +/  7' $FW%WP IW.%  :HOO$WWULEXWHV )LHOG1DPH :(676$. :HOOERUH$3,8:,  :HOOERUH6WDWXV 352' 0D[$QJOH 0' ,QFO ƒ  0' IW.%  :(//1$0( :(//%25( $QQRWDWLRQ /$67:2 (QG'DWH+6 SSP 'DWH&RPPHQW /DVW7DJ $QQRWDWLRQ 'HSWK IW.% (QG'DWH :HOOERUH /DVW0RG%\ /$677$*+/MHQQDOW /DVW5HY5HDVRQ $QQRWDWLRQ (QG'DWH :HOOERUH /DVW0RG%\ 5HY5HDVRQ08/7,/$7  +/MHQQDOW &DVLQJ6WULQJV &DVLQJ'HVFULSWLRQ //,1(5 2' LQ  ,' LQ  7RS IW.%  6HW'HSWK IW.%  6HW'HSWK 79' «  :W/HQ OE«  *UDGH / 7RS&RQQHFWLRQ ,%7P /LQHU'HWDLOVH[FOXGHVOLQHUSXSMRLQWVFDVLQJVXEVKRHIORDW 7RS IW.% 7RS 79' IW.% 7RS,QFO ƒ ,WHP'HV &RP 1RPLQDO,' LQ    +$1*(5 %DNHU%)ODQJHGKRRNKDQJHU;,QVLGHFDVLQJ     +$1*(5 %DNHU%)ODQJHGKRRNKDQJHU; %2:#   0'     6:(//3$&.(5 %DNHU2'6ZHOO3DFNHU::61     6:(//3$&.(5 %DNHU2'6ZHOO3DFNHU;;61     6:(//3$&.(5 %DNHU2'6ZHOO3DFNHU<<61  7XELQJ6WULQJVVWULQJPD[LQGLFDWHV/21*(67VHJPHQWRIVWULQJ 7XELQJ'HVFULSWLRQ 7XELQJ±3URGXFWLRQ 6WULQJ«  ,' LQ  7RS IW.%  6HW'HSWK IW«  6HW'HSWK 79'«  :W OEIW  *UDGH / 7RS&RQQHFWLRQ 7;3P%7& &RPSOHWLRQ'HWDLOVH[FOXGHVWXELQJSXSVSDFHRXWWKUHDG5.% 7RS IW.% 7RS 79' IW.% 7RS,QFO ƒ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« +/  7' $FW%WP IW.%  :HOO$WWULEXWHV )LHOG1DPH :(676$. :HOOERUH$3,8:,  :HOOERUH6WDWXV 352' 0D[$QJOH 0' ,QFO ƒ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‹'$7('51%<(5%':*$335,*6&$/(NABORS6+712 2)1$%2565,*(60%2367$&./$<287 (63.0 1760$< 60%(6% 5(9,6('$1',668(')25,1)250$7,21 -81 3.0  '5,//(56,'(2))'5,//(56,'( Originated: Delivered to:20-Jun-22Halliburton Alaska Oil and Gas Conservation Comm.Wireline & Perforating Attn.: Natural Resource TechnicianAttn: Fanny Haroun 333 West 7th Avenue, Suite 1006900 Arctic Blvd. Anchorage, Alaska 99501Anchorage, Alaska 99518Office: 907-275-2605FRS_ANC@halliburton.comThe technical data listed below is being submitted herewith. Please address any problems orconcerns to the attention of the sender aboveWELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPE DATA TYPE LOGGING DATE PRINTS #DIGITAL #1 1D-135 50-029-22816-00 n/a Kuparuk River Packer Setting Record Field- Final 9-Jun-22 0 12 1F-03A 50-029-20853-60 907799903 Kuparuk River Multi Finger Caliper Field & Processed 9-Apr-22 0 13 1H-103 50-029-23593-00 n/a Kuparuk River Leak Detect Log Field- Final 3-Jun-22 0 14 1H-103 50-029-23593-00 n/a Kuparuk River Leak Detect Log Field- Final 4-Jun-22 0 15 1H-103 50-029-23593-00 n/a Kuparuk River Multi Finger Caliper Field & Processed 3-Jun-22 0 16 1H-104 50-029-23610-00 n/a Kuparuk River Leak Detect Log Field- Final 6-Jun-22 0 17 1H-104 50-029-23610-00 n/a Kuparuk River Multi Finger Caliper Field & Processed 7-Jun-22 0 18 2M-33 50-029-22816-00 n/a Kuparuk River Packer Setting Record Field- Final 15-May-22 0 19 3R-107 50-029-23660-00 n/a Kuparuk River Packer Setting Record Field- Final 20-May-22 0 110PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518FRS_ANC@halliburton.comDate:Signed:Transmittal Date: ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 May 6, 2019 Commissioner Hollis French Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Commissioner Hollis French: C�)l I �5-U0.--5 MAY 0 0 2013 AO CC Enclosed please find a spreadsheet with a list of wells from the Kuparuk field (KRU). Each of these wells was found to have a void in the conductor. These voids were filled with cement if needed and corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The attached spread sheet presents the well name, top of cement depth prior to filling and volumes used on each conductor. Please call Roger Winter or Roger Mouser at 907-659-7506, if you have any questions. Sincerely, Roger Winter ConocoPhillips Well Integrity Field Supervisor ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10-404) Kuparuk Field Date 6/6/2019 Well Name API # PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft al U-180 50029233290000 2061500 20'9" 2.80 115" 5/4/2019 5 5/5/2019 11-1-101 50029235850000 2171380 2'10" 0.70 9" 5/4/2019 2.2 5/5/2019 1H-102 50029235800000 2170970 2'9" 0.65 8" 5/4/2019 1.7 5/5/2019 50029235930000 2180030 2'2.5" 0.45 9" 5/4/2019 2.2 5/5/2019 50029236100000 2180840 2'.5" 0.40 9" 5/4/2019 2.2 5/5/2019 -108B 50029236080200 2180820 3'8" 080 10"5/4/2019 2.5 5/5/2019 011H 50029235950000 2180130 2'3" 040 9" 5/4/2019 2.2 5/5/2019 50029236010000 2180310 2'6.5" 0.65 8.5" 5/4/2019 2 5/5/2019 50029235810000 2171330 2' 0.35 9" 5/4/2019 2.2 5/5/2019 50029235880000 2171680 2'1" 0.40 8" 5/4/2019 1.7 5/5/2019 1H-114 50029235840000 2171360 1911" 0.25 7.5" 5/4/2019 1.8 5/5/2019 11-1-115 50029236050000 2180530 2'2.5" 0.35 8.5" 5/4/2019 2 5/5/2019 1H-116 50029235940000 2180120 1'7" 0.25 7" 5/4/2019 1.7 5/5/2019 1H-117 50029236020000 21803201'11" 0.35 7" 5/4/2019 1.7 5/5/2019 1H-118 50029235780000 2170840 2'4" 0.50 8.5" 5/4/2019 2 5/5/2019 1 H-119 50029235910000 2171780 3' 0.80 8" 5/4/2019 1.8 5/5/2019