Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout222-019C:\Users\grgluyas\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\I1OGWE08\2024-05-19_22605_CRU_CD4-597_InjectionProfile_Updated_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 22605 CRU CD4-597 50-103-20839-00 Injection Profile 19-May-24 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC ***This update is to include the final report as well as the Emeraude folder*** Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ _____________________________________ Date received Signature ______________________________ ______________________________________ PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM 222-019 T38874 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.06.05 08:53:36 -08'00' C:\Users\grgluyas\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\I1OGWE08\2024-05-18_22605_CRU_CD4-597_CoilFlag_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 22605 CRU CD4-597 50-103-20839-00 Coil Flag 18-May-24 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM 222-019 T38847 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.05.28 10:14:54 -08'00' C:\Users\grgluyas\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\I1OGWE08\2024-05-19_22605_CRU_CD4-597_InjectionProfile_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 22605 CRU CD4-597 50-103-20839-00 Injection Profile 19-May-24 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM 222-019 T38846 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.05.24 11:27:12 -08'00' PTD: 222-019 T38519 2/21/2024Kayla Junke Kayla Junke Digitally signed by Kayla Junke Date: 2024.02.21 09:50:55 -09'00' PTD: 222-019 T38519 2/21/2024Kayla Junke Kayla Junke Digitally signed by Kayla Junke Date: 2024.02.21 09:48:56 -09'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Wednesday, December 6, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. CD4-597 COLVILLE RIV UNIT CD4-597 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 12/06/2023 CD4-597 50-103-20839-00-00 222-019-0 W SPT 4031 2220190 1500 223 223 221 221 467 566 455 535 INITAL P Bob Noble 10/29/2023 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:COLVILLE RIV UNIT CD4-597 Inspection Date: Tubing OA Packer Depth 1275 2500 2450 2440IA 45 Min 60 Min Rel Insp Num: Insp Num:mitRCN231030162107 BBL Pumped:2.7 BBL Returned:2.7 Wednesday, December 6, 2023 Page 1 of 1           DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 50 - 1 0 3 - 2 0 8 3 9 - 0 0 - 0 0 We l l N a m e / N o . CO L V I L L E R I V U N I T C D 4 - 5 9 7 Co m p l e t i o n S t a t u s 1W I N J Co m p l e t i o n D a t e 9/ 1 7 / 2 0 2 2 Pe r m i t t o D r i l l 22 2 0 1 9 0 Op e r a t o r Co n o c o P h i l l i p s A l a s k a , I n c . MD 18 3 5 0 TV D 43 5 5 Cu r r e n t S t a t u s 1- O I L 9/ 2 2 / 2 0 2 3 UI C Ye s We l l L o g I n f o r m a t i o n : Di g i t a l Me d / F r m t Re c e i v e d St a r t S t o p OH / CH Co m m e n t s Lo g Me d i a Ru n No El e c t r Da t a s e t Nu m b e r Na m e In t e r v a l Li s t o f L o g s O b t a i n e d : GR , R E S , P W D , D I R , A Z I , D E N , N E U , C A L I P E R , S O N I C No No Ye s Mu d L o g S a m p l e s D i r e c t i o n a l S u r v e y RE Q U I R E D I N F O R M A T I O N (f r o m M a s t e r W e l l D a t a / L o g s ) DA T A I N F O R M A T I O N Lo g / Da t a Ty p e Lo g Sc a l e DF 12 / 1 5 / 2 0 2 2 10 0 1 8 3 5 0 E l e c t r o n i c D a t a S e t , F i l e n a m e : C D 4 - 59 7 _ D r i l l i n g _ M e c h a n i c s _ D e p t h _ R T R M _ 1 0 0 f t - 18 3 5 0 f t . l a s 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 11 1 8 3 5 0 E l e c t r o n i c D a t a S e t , F i l e n a m e : C D 4 - 59 7 _ S c o p e _ S e r v i c e _ R T _ 1 0 0 f t - 1 8 3 5 0 f t 0 . l a s 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 11 1 8 3 5 0 E l e c t r o n i c D a t a S e t , F i l e n a m e : C D 4 - 59 7 _ S c o p e _ S e r v i c e _ R M _ 1 0 0 f t - 1 8 3 5 0 f t . l a s 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 44 7 7 4 4 4 7 7 7 E l e c t r o n i c D a t a S e t , F i l e n a m e : C D 4 - 59 7 _ D r i l l i n g _ M e c h a n i c s _ T i m e _ R u n 0 1 . l a s 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 44 7 8 4 4 4 7 9 0 E l e c t r o n i c D a t a S e t , F i l e n a m e : C D 4 - 59 7 _ D r i l l i n g _ M e c h a n i c s _ T i m e _ R u n 0 3 . l a s 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 44 7 9 4 4 4 8 0 2 E l e c t r o n i c D a t a S e t , F i l e n a m e : C D 4 - 59 7 _ D r i l l i n g _ M e c h a n i c s _ T i m e _ R u n 0 4 . l a s 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 44 8 0 7 4 4 8 1 5 E l e c t r o n i c D a t a S e t , F i l e n a m e : C D 4 - 59 7 _ D r i l l i n g _ M e c h a n i c s _ T i m e _ R u n 0 5 . l a s 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 12 1 1 8 3 5 0 E l e c t r o n i c D a t a S e t , F i l e n a m e : 5 0 - 1 0 3 - 2 0 8 3 9 - 0 0 - 00 _ C D 4 - 5 9 7 _ G 5 L A S _ 1 2 1 _ 1 8 3 5 0 f t M D . l a s 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 83 3 0 1 8 3 5 0 E l e c t r o n i c D a t a S e t , F i l e n a m e : 5 0 - 1 0 3 - 2 0 8 3 9 - 0 0 - 00 _ C D 4 - 5 9 7 _ G 8 _ R A W _ L A S _ 8 3 3 0 _ 1 8 3 5 0 f t MD . L A S 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 85 3 5 1 8 3 5 0 E l e c t r o n i c D a t a S e t , F i l e n a m e : 5 0 - 1 0 3 - 2 0 8 3 9 - 0 0 - 00 _ C D 4 - 5 9 7 _ L I T H O L O G Y _ L A S _ 8 5 3 5 _ 1 8 3 5 0 f t MD . l a s 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 80 8 0 1 2 3 5 3 E l e c t r o n i c D a t a S e t , F i l e n a m e : C D 4 - 59 7 _ S o n i c S c o p e 4 7 5 _ R M _ T O C . l a s 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 5 9 7 E O W L e t t e r . d o c 37 3 7 3 ED Di g i t a l D a t a Fr i d a y , S e p t e m b e r 2 2 , 2 0 2 3 AO G C C P a g e 1 o f 4 Su p p l i e d b y Op Su p p l i e d b y Op CD 4 - , 597 _ S c o p e _ S e r v i c e _ R M _ 1 0 0 f t - 1 8 3 5 0 f t . l a s 50 - 1 0 3 - 2 0 8 3 9 - 0 0 - , 00_ C D 4 - 5 9 7 _ G 5 L A S _ 1 2 1 _ 1 8 3 5 0 f t M D . l a s 50 - 1 0 3 - 2 0 8 3 9 - 0 0 - , 00 _ C D 4 - 5 9 7 _ L I T H O L O G Y _ L A S _ 8 5 3 5 _ 1 8 3 5 0 f t _ MD. l as DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 50 - 1 0 3 - 2 0 8 3 9 - 0 0 - 0 0 We l l N a m e / N o . CO L V I L L E R I V U N I T C D 4 - 5 9 7 Co m p l e t i o n S t a t u s 1W I N J Co m p l e t i o n D a t e 9/ 1 7 / 2 0 2 2 Pe r m i t t o D r i l l 22 2 0 1 9 0 Op e r a t o r Co n o c o P h i l l i p s A l a s k a , I n c . MD 18 3 5 0 TV D 43 5 5 Cu r r e n t S t a t u s 1- O I L 9/ 2 2 / 2 0 2 3 UI C Ye s DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 5 9 7 N A D 2 7 E O W C o m p a s s Su r v e y s [ C a n v a s ] . t x t 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 5 9 7 N A D 2 7 E O W C o m p a s s Su r v e y s [ M a c r o ] . t x t 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 5 9 7 N A D 2 7 E O W C o m p a s s Su r v e y s [ P e t r e l ] . t x t 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 5 9 7 N A D 2 7 E O W C o m p a s s Su r v e y s [ S u r v e y s ] . t x t 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 5 9 7 N A D 2 7 E O W C o m p a s s Su r v e y s . p d f 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 5 9 7 N A D 8 3 E O W C o m p a s s Su r v e y s [ M a c r o ] . t x t 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 5 9 7 N A D 8 3 E O W C o m p a s s Su r v e y s [ P e t r e l ] . t x t 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 5 9 7 N A D 8 3 E O W C o m p a s s Su r v e y s [ S u r v e y s ] . t x t 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 5 9 7 N A D 8 3 E O W C o m p a s s Su r v e y s . p d f 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 5 9 7 _ F i n a l F i e l d Su r v e y s _ T D _ 1 8 3 5 0 . x l s x 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 5 9 7 _ S u r v e y s . c s v 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ D r i l l i n g _ M e c h a n i c s _ D e p t h _ R T R M _ 1 0 0 f t - 18 3 5 0 f t . P D F 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ S c o p e _ S e r v i c e _ R T _ 2 M D _ 1 0 0 f t - 18 3 5 0 f t . P D F 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ S c o p e _ S e r v i c e _ R T _ 2 T V D _ 1 0 0 f t - 18 3 5 0 f t . P D F 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ S c o p e _ S e r v i c e _ R T _ 5 M D _ 1 0 0 f t - 18 3 5 0 f t . P D F 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ S c o p e _ S e r v i c e _ R T _ 5 T V D _ 1 0 0 f t - 18 3 5 0 f t . P D F 37 3 7 3 ED Di g i t a l D a t a Fr i d a y , S e p t e m b e r 2 2 , 2 0 2 3 AO G C C P a g e 2 o f 4 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 50 - 1 0 3 - 2 0 8 3 9 - 0 0 - 0 0 We l l N a m e / N o . CO L V I L L E R I V U N I T C D 4 - 5 9 7 Co m p l e t i o n S t a t u s 1W I N J Co m p l e t i o n D a t e 9/ 1 7 / 2 0 2 2 Pe r m i t t o D r i l l 22 2 0 1 9 0 Op e r a t o r Co n o c o P h i l l i p s A l a s k a , I n c . MD 18 3 5 0 TV D 43 5 5 Cu r r e n t S t a t u s 1- O I L 9/ 2 2 / 2 0 2 3 UI C Ye s We l l C o r e s / S a m p l e s I n f o r m a t i o n : Re c e i v e d St a r t S t o p C o m m e n t s To t a l Bo x e s Sa m p l e Se t Nu m b e r Na m e In t e r v a l IN F O R M A T I O N R E C E I V E D DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ S c o p e _ S e r v i c e _ R M _ 2 M D _ 1 0 0 f t - 18 3 5 0 f t . P D F 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ S c o p e _ S e r v i c e _ R M _ 2 T V D _ 1 0 0 f t - 18 3 5 0 f t . P D F 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ S c o p e _ S e r v i c e _ R M _ 5 M D _ 1 0 0 f t - 1 8 3 5 0 f t . p d f 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ S c o p e _ S e r v i c e _ R M _ 5 T V D _ 1 0 0 f t - 18 3 5 0 f t . P D F 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ D r i l l i n g _ M e c h a n i c s _ T i m e _ R u n 0 1 . P D F 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ D r i l l i n g _ M e c h a n i c s _ T i m e _ R u n 0 3 . P D F 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ D r i l l i n g _ M e c h a n i c s _ T i m e _ R u n 0 4 . P D F 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ D r i l l i n g _ M e c h a n i c s _ T i m e _ R u n 0 5 . P D F 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ S c o p e _ S e r v i c e _ R T R M _ 1 0 0 f t - 1 8 3 5 0 f t . d l i s 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ S c o p e _ S e r v i c e _ R T R M _ 1 0 0 f t - 1 8 3 5 0 f t . h t m l 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : 5 0 - 1 0 3 - 2 0 8 3 9 - 0 0 - 0 0 _ C D 4 - 59 7 _ M U D L O G _ 1 8 3 5 0 f t M D 2 i n c h . p d f 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : 5 0 - 1 0 3 - 2 0 8 3 9 - 0 0 - 0 0 _ C D 4 - 59 7 _ M U D L O G _ 1 8 3 5 0 f t M D 5 i n c h . p d f 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ S o n i c S c o p e 4 7 5 _ R M _ T O C . d l i s 37 3 7 3 ED Di g i t a l D a t a DF 12 / 1 5 / 2 0 2 2 E l e c t r o n i c F i l e : C D 4 - 59 7 _ S o n i c S c o p e 4 7 5 _ R M _ T O C _ 8 0 0 0 . P D F 37 3 7 3 ED Di g i t a l D a t a 9/ 2 9 / 2 0 2 2 34 5 0 1 8 3 5 0 5 1 8 1 5 Cu t t i n g s Fr i d a y , S e p t e m b e r 2 2 , 2 0 2 3 AO G C C P a g e 3 o f 4 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 50 - 1 0 3 - 2 0 8 3 9 - 0 0 - 0 0 We l l N a m e / N o . CO L V I L L E R I V U N I T C D 4 - 5 9 7 Co m p l e t i o n S t a t u s 1W I N J Co m p l e t i o n D a t e 9/ 1 7 / 2 0 2 2 Pe r m i t t o D r i l l 22 2 0 1 9 0 Op e r a t o r Co n o c o P h i l l i p s A l a s k a , I n c . MD 18 3 5 0 TV D 43 5 5 Cu r r e n t S t a t u s 1- O I L 9/ 2 2 / 2 0 2 3 UI C Ye s Co m p l e t i o n R e p o r t Pr o d u c t i o n T e s t I n f o r m a t i o n Ge o l o g i c M a r k e r s / T o p s Y Y / N A Y Co m m e n t s : Co m p l i a n c e R e v i e w e d B y : Da t e : Mu d L o g s , I m a g e F i l e s , D i g i t a l D a t a Co m p o s i t e L o g s , I m a g e , D a t a F i l e s Cu t t i n g s S a m p l e s Y / N A Y Y / N A Di r e c t i o n a l / I n c l i n a t i o n D a t a Me c h a n i c a l I n t e g r i t y T e s t I n f o r m a t i o n Da i l y O p e r a t i o n s S u m m a r y Y Y / N A Y Co r e C h i p s Co r e P h o t o g r a p h s La b o r a t o r y A n a l y s e s Y / N A Y / N A Y / N A CO M P L I A N C E H I S T O R Y Da t e C o m m e n t s De s c r i p t i o n Co m p l e t i o n D a t e : 9 / 1 7 / 2 0 2 2 Re l e a s e D a t e : 4 / 4 / 2 0 2 2 Fr i d a y , S e p t e m b e r 2 2 , 2 0 2 3 AO G C C P a g e 4 o f 4 M. G u h l 10 / 3 / 2 0 2 3 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ___________________ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address: Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool?CD4-597 Will planned perforations require a spacing exception? Yes No 9. Property Designation (Lease Number): 10. Field: Current Pools: Kuparuk River Field Colville Delta - Narwhal 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 18350 4360 4360 1550 None None Casing Collapse Structural Conductor Surface 2260 Intermediate 3090 Intermediate 5410, 8530 Liner 7500 Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name:Baskoro Tejo Contact Email:baskoro.tejo@cop.com Contact Phone: 907-265-6462 Authorized Title: Completions Engineer Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Post Initial Injection MIT Req'd? Yes No Spacing Exception Required? Yes No Subsequent Form Required: APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng 4306 4-1/2" 183506062 4-1/2" 4360 7" 20" 13-3/8" 120 2716 Perforation Depth MD (ft): 9-5/8"8324 7240. 11220 MD 5750 5020 120 2385 3447 120 2716 405912476 8324 Length Size Proposed Pools: TVD Burst PRESENT WELL CONDITION SUMMARY 18350 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL380077, ADL384211, ADL380082, ADL388903, ADL391587 222-019 P.O. Box 100360 Anchorage, Alaska, 99510-0360 50-103-20839-00-00 ConocoPhillips 8430 Tubing Grade: Tubing MD (ft): LTP @ 12288' MD / 4031' TVD, Production Packer @12195' MD/4020' TVD Perforation Depth TVD (ft): Tubing Size: L-80 10603 31-May-23 HAL TNT Prod Packer, Baker SLZXP Packer/Hanger, No SSSV 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: AOGCC USE ONLY Perforate Reppair Well Exploratory Stratigraphic Development Service BOP Test Mechanical Integrity Test Location Clearance No No Form 10-403 Revised 10/2022 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov Feb 16, 2023 By Meredith Guhl at 7:44 am, Feb 17, 2023 323-101 DSR-2/22/23SFD 4/19/2023 Undefined Oil SFD 4/19/2023 18,340 4,355 SFD 10-404 X CDW 04/19/2023 VTL 4/20/2023JLC 4/21/2023 04/21/2023 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.04.21 10:32:25 -08'00' RBDMS JSB 042523 Section 1 - Affidavit 10 AAC 25.283 (a)(1) Exhibit 1 is an affidavit stating that the owners, landowners, surface owners and operators within one-half mile radius of the current or proposed wellbore trajectory have been provided notice of operations in compliance with 20 AAC 25.283(a)(1). Section 2 – Plat 20 AAC 25.283 (2)(A) Plat 1: Wells within 1/2 mile Table 1: Wells within 1/2 miles (2)(C) Well Name API Well Type Status Field Name Fluid Type Well in Frac Port 1/2 mi Buffer Open Interval in Frac Port 1/2 mi Buffer CD4-499 501032081000 PROD ACTIVE QANNIK OIL CD4-595 501032077800 PROD ACTIVE NARWHAL OIL YES YES CD4-595PH 501032077870 EXPEND PA NARWHAL <Null> YES N/A CD4-594 501032080700 INJ ACTIVE NARWHAL SW CD4-594PH1 501032080770 EXPEND PA NARWHAL <Null> CD4-318 501032051900 PROD PA NANUQ KUPARUK OIL CD4-318A 501032051901 PROD ACTIVE NANUQ KUPARUK OIL CD4-318PB1 501032051970 EXPEND PA NANUQ KUPARUK <Null> CD4-320 501032053100 PROD ACTIVE NANUQ KUPARUK OIL CD4-320PB1 501032053170 EXPEND PA NANUQ KUPARUK <Null> CD4-319 501032051600 INJ ACTIVE NANUQ KUPARUK MWAG CD4-321 501032053600 INJ ACTIVE NANUQ KUPARUK MWAG CD4-302 501032054500 INJ ACTIVE NANUQ KUPARUK MWAG CD4-306 501032055000 INJ ACTIVE NANUQ KUPARUK MWAG CD4-322 501032055100 INJ ACTIVE NANUQ KUPARUK MWAG CD4-304 501032055500 PROD ACTIVE NANUQ KUPARUK OIL CD4-304PB1 501032055570 EXPEND PA NANUQ KUPARUK <Null> CD4-301 501032055700 PROD PA NANUQ KUPARUK <Null> CD4-301A 501032055701 PROD PA NANUQ KUPARUK <Null> CD4-301B 501032055702 PROD ACTIVE NANUQ KUPARUK OIL CD4-208 501032051700 INJ PA NANUQ MWAG CD4-208PB1 501032051770 EXPEND PA NANUQ <Null> CD4-209 501032053200 INJ ACTIVE NANUQ MWAG NANUQ 3 501032036500 EXPLOR PA NANUQ <Null> CD4-292 501032066900 PROD ACTIVE NANUQ OIL CD4-291 501032067200 INJ ACTIVE NANUQ MWAG CD4-291PB1 501032067270 EXPEND PA NANUQ <Null> CD4-290 501032067400 PROD ACTIVE NANUQ OIL CD4-289 501032069700 INJ ACTIVE NANUQ PW YES YES CD4-210 501032053300 PROD PA NANUQ OIL CD4-214 501032053700 INJ ACTIVE NANUQ MWAG CD4-214L1 501032053760 INJ ACTIVE NANUQ MWAG CD4-211 501032053800 PROD ACTIVE NANUQ OIL CD4-211L1 501032053860 PROD ACTIVE NANUQ OIL CD4-211L1-01 501032053861 PROD ACTIVE NANUQ OIL CD4-215 501032053900 PROD ACTIVE NANUQ OIL CD4-298 501032062300 PROD ACTIVE NANUQ OIL CD4-298PB1 501032062370 EXPEND PA NANUQ <Null> CD4-215L1 501032053960 PROD ACTIVE NANUQ OIL CD4-213 501032054000 INJ PA NANUQ <Null> NANUQ 5 501032041400 EXPLOR PA ALPINE <Null> CD4-208A 501032051701 PROD ACTIVE ALPINE OIL CD4-208AL1 501032051760 PROD ACTIVE ALPINE OIL CD4-208APB1 501032051771 EXPEND PA ALPINE <Null> CD4-12 501032041401 INJ ACTIVE ALPINE MWAG CD4-12PB1 501032041470 EXPEND PA ALPINE <Null> CD4-96 501032067300 PROD PA ALPINE OIL CD4-96A 501032067301 PROD ACTIVE ALPINE OIL CD4-96APB1 501032067370 EXPEND PA ALPINE <Null> CD4-93 501032069000 PROD PA ALPINE <Null> CD4-93A 501032069001 PROD ACTIVE ALPINE OIL CD4-26 501032060000 INJ ACTIVE ALPINE MWAG CD4-24 501032060200 INJ ACTIVE ALPINE MWAG CD4-24PB1 501032060270 EXPEND PA ALPINE <Null> CD4-24PB2 501032060271 EXPEND PA ALPINE <Null> CD4-25 501032060800 PROD ACTIVE ALPINE OIL CD4-25L1 501032060860 PROD ACTIVE ALPINE OIL CD4-25PB1 501032060870 EXPEND PA ALPINE <Null> CD4-210A 501032053301 PROD PA ALPINE <Null> CD4-210B 501032053302 PROD ACTIVE ALPINE OIL CD4-210APB1 501032053370 EXPEND PA ALPINE <Null> CD4-17 501032053400 INJ ACTIVE ALPINE MWAG CD4-16 501032053500 PROD ACTIVE ALPINE OIL CD4-23 501032062100 PROD ACTIVE ALPINE OIL CD4-23PB1 501032062170 EXPEND PA ALPINE <Null> CD4-23PB2 501032062171 EXPEND PA ALPINE <Null> CD4-213A 501032054001 INJ PA ALPINE <Null> CD4-213B 501032054002 INJ ACTIVE ALPINE MWAG CD4-213BPB1 501032054070 EXPEND PA ALPINE <Null> CD4-213BPB2 501032054071 EXPEND PA ALPINE <Null> CD2-77 501032062900 PROD ACTIVE ALPINE OIL CD4-07 501032055300 PROD ACTIVE ALPINE OIL CD4-03 501032064100 INJ ACTIVE ALPINE MWAG CD4-05 501032055800 PROD ACTIVE ALPINE OIL CD4-27 501032064400 INJ ACTIVE ALPINE MWAG CD4-27PB1 501032064470 EXPEND PA ALPINE <Null> CD4-27PB2 501032064471 EXPEND PA ALPINE <Null> CD4-27PB3 501032064472 EXPEND PA ALPINE <Null> Wells within 1/2 mile buffer of well track * Data from SDE layer: AK_WELL_BOTTOM_TD_ATDB_DD83 SECTION 3 – FRESHWATER AQUIFERS 20 AAC 25.283(a)(3) There are no freshwater aquifers or underground sources of drinking water within a one-half mile radius of the current or proposed wellbore trajectory. See Conclusion number 3 of the Area Injection Order AIO 018.000- Colville River Field, Alpine Oil Pool: Enhanced Recovery Project, which states “No underground sources of drinking water (“USDWs”) exist beneath the permafrost in the Colville River Unit area.” SECTION 4 – PLAN FOR BASELINE WATER SAMPLING FOR WATER WELLS 20 AAC 25.283(a)(4) There are no water wells located within one-half mile of the current or proposed wellbore trajectory and fracturing interval. A water well sampling plan is not applicable. SECTION 5 – DETAILED CEMENTING AND CASING INFORMATION 20 AAC 25.283(a)(5) All casing is cemented and tested in accordance with 20 AAC 25.030. See Wellbore schematic for casing details. SECTION 6 – ASSESSMENT OF EACH CASING AND CEMENTING OPERATION TO BE PERFORMED TO CONSTRUCT OR REPAIR THE WELL 20 AAC 25.283(a)(6) Casing & Cement Assessments: 13 & 3/8” casing cement pump report on 08/05/2022 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 11ppg DeepCRETE cement lead, followed by 15.8 ppg class G cement displaced with 8.33 ppg water. Full returns were seen throughout the job. The plug bumped at 869 psi and the floats were checked and they held. 9 & 5/8” casing cement pump report on 08/19/2022 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg class G cement, displaced with 8.33 ppg water. The plug bumped at 939 psi and the floats were checked and they held. The 7” casing cement report on 08/31/2022 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 13.0 ppg Class G cement lead and 15.8 ppg class G cement tail. Full returns were seen throughout the job. The plug bumped at 1062 psi and the floats were checked and they held. Summary All casing is cemented in accordance with 20 AAC 25.030 and each hydrocarbon zone penetrated by the well is isolated. Based on engineering evaluation of the wells referenced in this application, ConocoPhillips has determined that this well can be successfully fractured within its design limits. SECTION 7 – PRESSURE TEST INFORMATION AND PLANS TO PRESSURE-TEST CASINGS AND TUBINGS INSTALLED IN THE WELL 20 AAC 25.283(a)(7) On 08/07/2022 the 13-3/8” casing was pressure tested to 3,000 psi for 30 minutes On 08/22/2022 the 9-5/8” casing was pressure tested to 3,000 psi for 30 minutes. On 09/03/2022 the 7” casing was pressure tested to 3,500 psi for 30 minutes. On 09/16/2022 the 4-1/2” tubing was pressure tested to 3,500 psi for 30 minutes. On 09/16/2022 the 7” casing by 9-5/8” by 4.5 tubing annulus was pressure tested to 3,850 psi for 30 minutes. AOGCC Required Pressures [all in psi] Maximum Predicted Treating Pressure (MPTP) 6,125 Annulus pressure during frac 3,850 Annulus PRV setpoint during frac 3,600 7-5/8" Annulus pressure test 3,850 4-1/2" Tubing pressure Test 3,500 Electronic PRV 7,125 Highest pump trip 6,625 Max IA allowed is 3500 psi. 3,850 Error. CDW 04/19/2023 3,600 SECTION 8 – PRESSURE RATINGS AND SCHEMATICS FOR THE WELLBORE, WELLHEAD, BOPE AND TREATING HEAD 20 AAC 25.283(a)(8) Table 2: Wellbore pressure ratings Size Weight, ppf Grade API Burst, psi API Collapse, psi 13 & 3/8” 68 L-80 5,050 2,260 9 & 5/8” 40 L-80 5,750 3,090 7” 26 L-80 7,240 5,410 7” 29 TN-110S 11,220 8,530 4.5” 12.6 L-80 8,430 7,500 Stimulation Surface Rig-Up Alpine 10K Frac Tree SECTION 9 – DATA FOR FRACTURING ZONE AND CONFINING ZONES 20 AAC 25.283(a)(9) CPAI has formed the opinion, based on seismic, well, and other subsurface information currently available that the fracturing zone consists of Cretaceous Brookian “Narwhal” Topset Sands. The Narwhal interval is approximately 225’ TVD thick at the heel of the lateral, thickening to >700’ TVD at the toe. The Narwhal reservoir is a very fine-grained quartz and lithic rich sand, interbedded with mudstone and siltstone, with a coarsening upward log profile. Top Narwhal was intersected at 12577’ MD, -4014.5’ TVDSS. The estimated fracture gradient for the Narwhal reservoir is 10.9 ppg. The overlying confining zone consists of greater than 1500’ TVD of Seabee Formation (dominantly mudstones beginning at top of C-30, 2789’ MD, -2372’ TVDSS) and approximately 200’ TVD of Albian K3 (dominantly siltstones). The estimated fracture gradient for the Seabee is 16-17 ppg and for the Albian K3 14.2 ppg. The underlying confining zone consists of approximately 250’ TVD of Albian mudstones and siltstones, based on nearby well control (CD4-595PH) and was not penetrated in the CD4-597 wellbore. The estimated fracture gradient for this interval is 16-17 ppg. SECTION 10 – LOCATION, ORIENTATION AND A REPORT ON MECHANICAL CONDITION OF EACH WELL THAT MAY TRANSECT CONFINING ZONE 20 AAC 25.283(a)(10) The plat shows the location and orientation of each well that transects the confining zone. ConocoPhillips has formed the opinion, based on following assessments for each well and seismic, well, and other subsurface information currently available that none of these wells will interfere with containment of the hydraulic fracturing fluid within the one-half mile radius of the proposed wellbore trajectory. Casing & Cement assessments for all wells that transect the confining zone: CD4-595 PH: CD4-595 PH was plugged and abandoned per state regulations on 1/10/2019 CD4-595: The 7” intermediate 2 liner was cemented on 1/28/2019. The primary cement job was pumped with 74.5 bbls of 13.5 ppg Class G cement lead and 21.5 bbls 15.8 ppg class G cement tail. The plugs bumped and floats held during the job, with no losses to formation. A Slim Cement Mapping Tool (SCMT) log was run on May 16th, 2019 and the top of good cement is at 13,353 ftMD. STATUSCasing SizeTop of Oil Pool (MD)Top of Oil Pool (TVDSS)Top of Cement (MD)Top of Cement (TVDSS)Top of Cement Determined ByReservoir Status Zonal IsolationCement Operations SummaryMechanical IntegrityPA 9 5/8" 16,275' 4,034' 14,677' 3,836' Tag PA as per AOGCC regulations4 P&A plugs with TOC @ 14,677'. 7" casing covering abandoned holePlug 1: 304 sx 15.8 ppg class G cement Plug 2: 306 sx 15.8 ppg class G cement Plug 3: 307 sx 15.8 ppg class G cement Plug 4: 328 sx 15.8 ppg class G cement1/27/19, 7" & 9 5/8" casing pressure tested to 2,000 psiACTIVE7" 16,275' 4,034' 13,353' 3,674' log ProducingTOC at 13,353' MD and Packer at 10,528' MD13.5 ppg class G cement lead and 15.8 ppg class G cement tail4/30/2019 9-5/8" intrm1 casing and 7" intrm2 liner test to 3,600 psi for 30 minutes SECTION 11 – LOCATION OF, ORIENTATION OF AND GEOLOGICAL DATA FOR FAULTS AND FRACTURES THAT MAY TRANSECT THE CONFINING ZONES 20 AAC 25.283(a)(11) CPAI has formed the opinion, based on seismic, well, and other subsurface information currently available that two faults or fracture systems transect the confining zone within one half mile radius of the wellbore trajectory for CD4-597. The first faut intersected the CD4-597 well path at 6745’ MD and the second fault intersected at 17148’ MD. Both faults were interpreted from seismic data prior to drilling. The first fault was encountered far above the reservoir interval in the overlying Seabee Formation. The fault was interpreted to be a single plane with 60-90’ of throw. The second fault was encountered as predicted with an estimated throw of 10-15’ within the Narwhal reservoir. Within one half mile radius of the wellbore trajectory for CD4-597, the first fault was also encountered in the CD4-595 at 6630’ MD and CD4-594 at 6297’ MD, and the second fault was encountered in CD4-595 at 16350’ MD. Fracture gradients within the top seal intervals would not be exceeded during fracture stimulation and would therefore confine injected fluids to the pool. CPAI has formed the opinion, based on seismic, well and other subsurface information currently available that the apparent faults will not interfere with containment. We do not expect any of our hydraulic fractures to intersect the faults seen in this wellbore. If there are indications that a fracture has intersected a fault during fracturing operations, ConocoPhillips will go to flush and terminate the stage immediately. Well Name Fault Depth MD (ft) Fault Depth TVDSS (ft) Fault Vertical Displacement (ft) Fluid Losses (bbls/hr) CD4-597 6475 -3162 60-90 0 CD4-597 17148 -4239 10-15 0 CD4-595 6630 -2815 60-90 0 CD4-595 16350 -4174 10-15 0 CD4-594 6297 -2888 60-90 0 SECTION 12 – PROPOSED HYDRAULIC FRACTURING PROGRAM 20 AAC 25.283(a)(12) CD4-597 was completed in 2022 as a horizontal producer in the Narwhal formation. The well was completed with a 4.5” tubing upper completion and a 4.5” liner with a ball actuated sliding sleeve lower completion. The first stage sleeve has already been shifted open for pressure monitoring in November 2022. The first stage will be stimulated without dropping another ball. The 2nd stage will then be pumped and a third ball drop (progressively getting larger) after each remaining stage, these balls will provide isolation from the previous stage and allow fracturing from the toe of the well towards the heel. Proposed Procedure: Halliburton Pumping Services: 1. Conduct Safety Meeting and Identify Hazards. Inspect Wellhead and Pad Condition to identify any preexisting conditions. 2. Ensure all Pre-frac Well work has been completed and confirm the tubing and annulus are filled with a freeze protect fluid to 2,000’ TVD. 3. Pressure test the rig installed frac tree to 10,000 psi. 4. Ensure the 10-403 Sundry has been reviewed and approved by the AOGCC. 5. MIRU 25 clean insulated Frac tanks, with a berm surrounding the tanks that can hold a single tank volume plus 10%. Load tanks with 100º F seawater (approx. 2,200 barrels are required for each stage with breakdown, maximum pad and pumping down the next ball. (450 bbls usable volume per tank). 6. MIRU HES Frac Equipment. 7. PT Surface lines to 10,000 psi using a Pressure test fluid. 8. Test IA Pop off system to ensure lines are clear and all components are functioning properly. 9. Bring up pumps and increase annulus pressure from 2,500 psi to 3,850 psi as the tubing pressures up. 10. Pump the 300 bbl breakdown stage (30# Hybor G) according to the attached excel HES pump schedule. Bring pumps up to maximum rate of 25 BPM as quickly as possible, pressure permitting. Ensure sufficient volume is pumped to load the well with Frac fluid, prior to shut down. 11. Perform a hard shut down, Obtain ISIP and fluid efficiency estimates. 12. Pump the 7 stage Frac job by following attached HES schedule @ ~25 bpm with a maximum expected treating pressure of 6,125 psi. 13. RDMO HES Equipment. Freeze Protect the tubing and wellhead if not able to complete following the flush. 14. Well is ready for Post Frac well prep/production tree installation and flowback (Slickline and possibly CTU). 2,500 psi to 3,850 Max IA allowed is 3500 psi based on 3850 psi IA test. CDW 04/19/2023 SECTION 13 – POST-FRACTURE WELLBORE CLEANUP AND FLUID RECOVERY PLAN 20 AAC 25.283(a)(13) Flowback will be initiated through a de-sander unit until the fluids clean up at which time it will be turned over to production for initial clean up production before conversion to injection WELL NAME API #SERVICE ORDER # FIELD NAMESERVICE DESCRIPTION DELIVERABLE DESCRIPTION DATA TYPE DATE LOGGED CDDirectional SurveyCD4-597 50-103-20839-00-00 222-019 CRU MWD/LWD/DD VISION SERVICES FINAL FIELD 11-Sep-22 1#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!Transmittal Receipt________________________________ X____________________________________________Print Name Signature DatePlease return via courier or sign/scan and email a copy to Schlumberger.VTuong@slb.comSLB Auditor -A Transmittal Receipt signature confirms that a package (box, envelope, etc.) has been received and the contents of the package have been verified to match the media noted above. The specific content of the CDs and/or hardcopy prints may or may not have been verified for correctness or quality level at this point.# Schlumberger-PrivateBy Meredith Guhl at 12:51 pm, Dec 16, 2022222-019T37373Meredith GuhlDigitally signed by Meredith Guhl Date: 2022.12.16 12:51:37 -09'00' TTT RR AA NN SS MM II TT TT AA LL FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 333 W. 7 th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE:: CD4-5977 Permit: 222-019 DATE: 12-14-2022 Transmitted: North Slope, Colville River Unit, Alaska Via SFTP upload Schlumberger log data Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com CC: CD4-597 e-transmittal well folder Receipt: Date: Alaska/IT-GGRE |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512 By Meredith Guhl at 11:54 am, Dec 15, 2022 222-019 T37373 Meredith Guhl Digitally signed by Meredith Guhl Date: 2022.12.15 11:55:40 -09'00' 1a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: __________________ Service Stratigraphic Test 2. Operator Name:6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: 9. Ref Elevations: KB: 17. Field / Pool(s): GL: 18.8 BF: Total Depth: 513' FSL, ' 4990' FEL S33 T11N R5E UM 10. Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y- Zone- 4 TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y- Zone- 4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 N/A (ft MSL) 22. Logs Obtained: GR, RES, PWD, DIR, AZI, DEN, NEU, CALIPER, POROSITY, SONIC 23. BOTTOM 20" H-40 120 10 yrds 13 3/8" L-80 2,387' 9 5/8" L-80 3,450 7" L-80 4,058 4 1/2" L-80 4,355 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MSCF: Test Period Casing Press:Calculated Gas-MSCF:Oil Gravity - API (corr): Press. 24-Hour Rate 8,171' 12,476' 3,428' 8 3/4" Liner 12,288'-18,340' MD to 3,720'-4,355' TVD 2,406' - 2,741' MD 52.5 bbls of Class G 4.5" 12,287' MD/4,031' TVD 167' FSL, 2654 ' FEL, S29 T11N R5E UM 18,340' CASING, LINER AND CEMENTING RECORD 1,268' MD/1,248'TVD SETTING DEPTH TVD 40' 5949897 5944920 94 Sr Res EngSr Pet GeoSr Pet Eng Narwhal/ Undefined Oil Pool Lead: 87 bbls of 13ppg Class G Tail: 22 bbls of 15.8ppg Class G 26 N/A Oil-Bbl:Water-Bbl: Gas-Oil Ratio:Choke Size:Water-Bbl: 24 Flow Tubing INJECTOR Date of Test: Oil-Bbl: Per 20 AAC 25.283 (i)(2) attach electronic information 12.6 3,720' PACKER SET (MD/TVD) TUBING RECORD 6 1/8"12,288' PRODUCTION TEST HOLE SIZE ACID, FRACTURE, CEMENT SQUEEZE, ETC. If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): Lead: 447 bbls of 11ppg G Blend Tail: 73 bbls of 15.8ppg Class G CEMENTING RECORD 12,298' SIZE 40 40' AMOUNT PULLED 40' 2,716' DEPTH SET (MD) 57.9 388625 TOP SETTING DEPTH MD 40' BOTTOM 18,350'MD/4,355'TVD N/A GRADE N/A 68 120' LONS 97-007 CASING CRU/CD4-597 ADL380077, ADL384211, ADL380082, ADL388903 2412' FSL, 12' FEL, S24 T11N R4E UM WT. PER FT. 378233 Top of Productive Interval: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, TOP 385740 8/1/2022 16" 42" P.O. Box 100360, Anchorage, AK 99510-0360 5957540 9/8/2022 40' 50-103-20839-00-00 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ConocoPhillips Alaska, Inc. WAG Gas 9/17/2022 222-019 8,324' 40' 12 1/4" 141 bbls of 15.8ppg Class G WINJ SPLUGOther Abandoned Suspended Stratigraphic Test No No Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment By James Brooks at 3:35 pm, Oct 17, 2022 Completed 9/17/2022 JSB RBDMS JSB 102522 Colville River/Narwhal Undef Oil mudlogs SFD 11/8/2022 DSR-11/3/22 GVTL 10/3/2023 Conventional Core(s): Yes No Sidewall Cores: N/A 30. MD TVD Surface Surface 1268 1246 2421 2200 2789 2430 3525 2750 C10 5335 3014 10978 3839 Top of Productive Interval 12577 4072 (Narwhal ): Formation at total depth 18350 4355 (TD): Narwhal 31. List of Attachments: Cement Report, Directional Survey, Well Schematic, Operations Summary 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Haibin Guo Contact Email:haibin.guo@conocophillips.com Authorized Contact Phone:907-265-1487 General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. TPI (Top of Producing Interval). Signature w/Date: Haibin Guo Drilling Engineer Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. 29. GEOLOGIC MARKERS (List all formations and markers encountered): FORMATION TESTS Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment, whichever occurs first. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. K3 C30 INSTRUCTIONS Authorized Name: Authorized Title: C40 C20 If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. Yes No Well tested? Yes No 28. CORE DATA If yes, list intervals and formations tested, briefly summarizing test results. Attach separate pages to this form, if needed, and submit detailed test information, including reports, per 20 AAC 25.071. NAME Permafrost - Top Permafrost - Base No NoSidewall Cores: Yes No Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment Digitally signed by Haibin Guo DN: OU=CPAI, O=Drilling and Wells, CN=Haibin Guo, E=Haibin.guo@conocophillips.com Reason: I am the author of this document Location: your signing location here Date: 2022.10.17 11:55:49-08'00'Foxit PDF Editor Version: 11.2.1Haibin Guo CD4-597 Horizontal Narwhal Sand Injector Wellbore Schematic Final Conductor Installed: 20" set @ 120' MD / TVD Production Liner: 4-1/2" 12.6# L-80 HYD563 Tubing: 4-½” 12.6# L-80 HYD563 To 12,323' MD 12-1/4" Intermediate 1 Hole 6-1/8" Production Hole 16" Surface Hole Narwhal Left of Lefty Sand Top: 12,975' MD / 4,129' TVD Intermediate 2: 7" 26#, L80, TXPM and 7" 29# TN110SS TS-Blue at 12,476' MD / 4,059' TVD RKB 7" x 9 5/8" Liner hanger at 8,170 MD FMC Big Bore Well Head SLB Single DHG K-3 Sand Top: 10,975' MD / 3,839' TVD Narwhal Central Sand Top: 12,577' MD / 4,073' TVD 4-½” Davis Lynch dual valve float shoe/collar 3.75" SLB DB Nipple 3.813" X CMD 3.813" HAL X Nipple 8-3/4” Intermediate 2 Hole Production TD: 18,350' MD / 4,360' TVD 4-1/2” x 7" ZXP Liner Top Packer 12,288' MD 4-1/2” x 7" Baker Flex Lock Liner hanger DrilPlex WBM 10.5ppg LSND WBM 11ppg LSND WBM 9.2 ppg VersaPro OBM 9.0 ppg Diesel 6.8ppg ~1500' TVD GLMGLM GLM Brine 9.5ppg Frac sleeves Baker FracPoint 5.6"OD Narwhal Lefty Sand 13,041' MD/ 4138' TVD Baker Premier Production Packer SLB KBG 4-5 GLM with SOV SLB KBG 4-5 GLM with Dummy Valve Last Update: 9/30/2022 Doyon 142 RKB = 57.9' MSL Surface Casing: 13-3/8" 68# L-80 HYD563 2,716’ MD / 2,385' TVD RKB 55 deg Inc Int1 TOC @ 6,580' MD / 3,197' TVD RKB 250' TVD above casing shoe Intermediate 1: 9 5/8" 40#, L80, TXPM Set at 8,324' MD / 3,447' TVD RKB 82 deg Inc Int 2 TOC At 9,475' MD / 3,619' TVD RKB 1500'MD above K3 top Casing Strings Casing Description CONDUCTOR OD (in) 20 ID (in) 19.12 Top (ftKB) 38.8 Set Depth (ft… 120.0 Set Depth … 120.0 Wt/Len (lb/ft) 94.00 Grade Top Connection Casing Description SURFACE OD (in) 13 3/8 ID (in) 12.42 Top (ftKB) 38.8 Set Depth (ft… 2,716.4 Set Depth … 2,386.9 Wt/Len (lb/ft) 68.00 Grade L-80 Top Connection Hyd563 Casing Description INTERMEDIATE OD (in) 9 5/8 ID (in) 8.84 Top (ftKB) 36.0 Set Depth (ft… 8,324.0 Set Depth … 3,450.3 Wt/Len (lb/ft) 40.00 Grade L80 Top Connection TXP Casing Description LINER OD (in) 7 ID (in) 6.28 Top (ftKB) 8,170.5 Set Depth (ft… 12,476.0 Set Depth … 4,058.3 Wt/Len (lb/ft) 26.00 Grade L-80 Top Connection 7 Liner Details: excludes liner, pup, joints, casing, sub , shoe , float... Top (ftKB) Top (TVD) (ftKB) Top Incl (°)Item Des Com Make Model Nominal ID (in) 8,192.1 3,431.1 81.66 Nipple - RS Baker RS Nipple and Hyd 563 Pup Baker RS 6.220 Casing Description LINER OD (in) 4 1/2 ID (in) 3.96 Top (ftKB) 12,287.9 Set Depth (ft… 18,340.0 Set Depth … 4,355.1 Wt/Len (lb/ft) 12.60 Grade L-80 Top Connection Hyd 563 Liner Details: excludes liner, pup, joints, casing, sub , shoe , float... Top (ftKB) Top (TVD) (ftKB) Top Incl (°)Item Des Com Make Model Nominal ID (in) 12,330.0 4,037.2 81.63 Crossover Crossover Bushing 4-1/2" Hyd563 pin x 5" VTHT Box Baker 3.980 12,341.1 4,038.8 81.62 Crossover Crossover Bushing 5" VTHT Box x 4- 1/2" Hyd563 pin Baker 3.890 13,018.5 4,134.6 81.74 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#14) Baker 3.980 13,567.8 4,209.7 83.47 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#13) Baker 3.980 13,842.3 4,232.8 85.73 FRAC Sleeve/Port Baker frac sleeve #11, Hyd563 3.438" OD Ball 3.386 14,017.0 4,245.9 85.88 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#12) Baker 3.980 14,250.5 4,255.7 89.50 FRAC Sleeve/Port Baker frac sleeve #10, Hyd563 3.375" OD Ball 3.327 14,426.6 4,257.1 89.65 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#11) Baker 3.980 14,659.2 4,258.4 89.83 FRAC Sleeve/Port Baker frac sleeve #9, Hyd563 3.313" OD Ball 3.256 14,833.3 4,259.0 89.73 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#10) Baker 3.980 15,067.3 4,260.6 89.61 FRAC Sleeve/Port Baker frac sleeve #8, Hyd563 3.250" OD Ball 3.195 15,240.8 4,261.5 89.67 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#9) Baker 3.980 15,465.2 4,263.7 89.31 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#8) Baker 3.980 15,616.4 4,267.3 88.15 FRAC Sleeve/Port Baker frac sleeve #7, Hyd563 3.188" OD Ball 3.119 15,792.3 4,271.3 89.48 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#7) Baker 3.980 16,027.8 4,273.2 89.72 FRAC Sleeve/Port Baker frac sleeve #6, Hyd563 3.125" OD Ball 3.074 16,200.3 4,274.2 89.52 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#6) Baker 3.980 16,433.4 4,276.2 89.43 FRAC Sleeve/Port Baker frac sleeve #5, Hyd563 3.063" OD Ball 3.003 16,607.9 4,277.3 89.68 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#5) Baker 3.980 16,800.5 4,278.3 89.36 FRAC Sleeve/Port Baker frac sleeve #4, Hyd563 3.000" OD Ball 2.958 17,056.6 4,288.8 85.48 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#4) Baker 3.980 17,239.3 4,306.3 83.39 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#3) Baker 3.980 17,470.7 4,336.0 82.75 FRAC Sleeve/Port Baker frac sleeve #3, Hyd563 2.945" OD Ball 2.909 17,645.3 4,352.4 87.03 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#2) Baker 3.980 17,838.1 4,357.5 89.70 FRAC Sleeve/Port Baker frac sleeve #2, Hyd563 2.895" OD Ball 2.855 18,011.1 4,358.2 90.18 Swell Packer Baker 5.6" OD Oil Swell Packer, 4-1/2", 12.6#, L80, H563 (#1) Baker 3.980 18,243.2 4,356.1 90.62 FRAC Sleeve/Port Baker frac sleeve #1, Hyd563 2.845" OD Ball 2.804 Tubing Strings: string max indicates LONGEST segment of string Top (ftKB) 33.6 Set Depth … 4,032.5 String Ma… 4 1/2 Tubing Description Tubing – Completion Upper Set Depth (ftKB) 12,297.8 Wt (lb/ft) 12.60 Grade L-80 Top Connection Hyd563 ID (in) 3.96 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°)Item Des OD Nominal (in)Com Make Model Nominal ID (in) 33.633.60.00 HANGER 11.000 FMC 4-1/2" Tubing Hanger Hydril HYD 563 Min ID 3.92" FMC TC-EMS3.958 1,287.4 1,264.221.34 Nipple - DB, XN, DS, D 4.500 NIPPLE,LANDING,4 1/2","X",3.813", H563 HESSN# 4548838 -3 3.813 3,282.12,671.267.78 INJ 4.500 4-1/2" x 1" Camco KBM4-5 GLM w/ DCK-2 SOV, 12.6# H563 BEK Latch Camco SN# 23288- 10 3.958 11,996.9 3,988.6 81.59 FRAC Sleeve/Port 5.500 Sliding Sleeve,4 1/2","X",3.813" GX, H563 (NEXO-2 CMD) BakerPN# H12610 307 3.813 HORIZONTAL, CD4-597, 10/17/2022 9:29:45 AM Vertical schematic (actual) LINER; 12,287.9-18,340.0 Shoe; 18,337.9-18,340.0 Collar - Float; 18,295.7-18,297.8 FRAC Sleeve/Port; 18,243.2- 18,245.5 Swell Packer; 18,011.1-18,031.1 FRAC Sleeve/Port; 17,838.1- 17,840.5 Swell Packer; 17,645.3-17,665.3 FRAC Sleeve/Port; 17,470.7- 17,473.1 Swell Packer; 17,239.3-17,259.3 Swell Packer; 17,056.6-17,076.6 FRAC Sleeve/Port; 16,800.5- 16,802.8 Swell Packer; 16,607.9-16,627.9 FRAC Sleeve/Port; 16,433.4- 16,435.8 Swell Packer; 16,200.3-16,220.3 FRAC Sleeve/Port; 16,027.8- 16,030.1 Swell Packer; 15,792.3-15,812.3 FRAC Sleeve/Port; 15,616.4- 15,618.8 Swell Packer; 15,465.2-15,485.2 Swell Packer; 15,240.8-15,260.8 FRAC Sleeve/Port; 15,067.3- 15,069.7 Swell Packer; 14,833.3-14,853.3 FRAC Sleeve/Port; 14,659.2- 14,661.5 Swell Packer; 14,426.6-14,446.6 FRAC Sleeve/Port; 14,250.5- 14,252.9 Swell Packer; 14,017.0-14,037.0 FRAC Sleeve/Port; 13,842.3- 13,844.6 Swell Packer; 13,567.8-13,587.8 Swell Packer; 13,018.5-13,038.5 LINER; 8,170.5-12,476.0 Shoe - Float; 12,472.4-12,476.0 Collar - Landing ; 12,345.9- 12,349.3 Crossover; 12,341.0-12,342.8 Hanger; 12,331.7-12,341.0 Crossover; 12,330.0-12,331.7 Coupling; 12,318.7-12,320.2 Packer (Liner Top); 12,287.9- 12,318.7 Mule Shoe; 12,290.1 Mechanical Locator; 12,288.2 VALVE; 12,265.9 Nipple ; 12,215.7 Packer (Tubing); 12,195.1 Gauge / Pump Sensor; 12,131.9 INJ; 12,064.8 FRAC Sleeve/Port; 11,996.9 INTERMEDIATE; 36.0-8,324.0 Shoe - Float; 8,320.1-8,324.0 Collar - Float; 8,237.6-8,240.5 Nipple - RS; 8,192.1-8,199.0 Hanger; 8,170.5-8,192.1 INJ; 3,282.1 SURFACE; 38.8-2,716.4 Shoe - Float; 2,712.1-2,716.4 Collar - Float; 2,623.1-2,626.4 Nipple - DB, XN, DS, D; 1,287.4 CONDUCTOR; 38.8-120.0 Casing Hanger; 38.8-40.1 Casing Hanger; 36.0-37.4 HANGER; 33.6 WNS INJ KB-Grd (ft) 39.10 RR Date Other Elev… CD4-597 ... TD Act Btm (ftKB) 18,350.0 Well Attributes Field Name NARWHAL Wellbore API/UWI 501032083900 Wellbore Status INJ Max Angle & MD Incl (°)MD (ftKB) WELLNAME WELLBORE Annotation End DateH2S (ppm)DateComment Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°)Item Des OD Nominal (in)Com Make Model Nominal ID (in) 12,064.8 3,998.5 81.56 INJ 4.500 4-1/2" x 1" Camco KBM4-5 GLM w/ DV, 12.6# H563 BK Latch Camco SN# 23288- 11 3.865 12,131.9 4,008.4 81.58 Gauge / Pump Sensor 4.500 SLB Metris Evolve DHG + Mandrel, 4-1/2" 12.6# L-80, H563 SLB SN# 43844-1 3.920 12,215.8 4,020.6 81.63 Nipple 4.500 TUBING,4 1/2",12.6#,L80, H563 Tenaris Hydril Hyd563 3.813 12,288.2 4,031.1 81.65 Mechanical Locator 4.920 Mechanical locator (Collar 5.5" OD ( NOGO spaced out 2') Baker Mechani cal Shear Locator 3.860 12,290.1 4,031.4 81.64Mule Shoe 4.500 Mule Shoe - 4 1/2" Hyd 563 Box Baker Mule shoe 3.958 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB)Top Incl (°)Des Com Make Model SN ID (in) 33.633.60.00 BPV 12,265.9 4,027.9 81.65 VALVE HORIZONTAL, CD4-597, 10/17/2022 9:29:51 AM Vertical schematic (actual) LINER; 12,287.9-18,340.0 Shoe; 18,337.9-18,340.0 Collar - Float; 18,295.7-18,297.8 FRAC Sleeve/Port; 18,243.2- 18,245.5 Swell Packer; 18,011.1-18,031.1 FRAC Sleeve/Port; 17,838.1- 17,840.5 Swell Packer; 17,645.3-17,665.3 FRAC Sleeve/Port; 17,470.7- 17,473.1 Swell Packer; 17,239.3-17,259.3 Swell Packer; 17,056.6-17,076.6 FRAC Sleeve/Port; 16,800.5- 16,802.8 Swell Packer; 16,607.9-16,627.9 FRAC Sleeve/Port; 16,433.4- 16,435.8 Swell Packer; 16,200.3-16,220.3 FRAC Sleeve/Port; 16,027.8- 16,030.1 Swell Packer; 15,792.3-15,812.3 FRAC Sleeve/Port; 15,616.4- 15,618.8 Swell Packer; 15,465.2-15,485.2 Swell Packer; 15,240.8-15,260.8 FRAC Sleeve/Port; 15,067.3- 15,069.7 Swell Packer; 14,833.3-14,853.3 FRAC Sleeve/Port; 14,659.2- 14,661.5 Swell Packer; 14,426.6-14,446.6 FRAC Sleeve/Port; 14,250.5- 14,252.9 Swell Packer; 14,017.0-14,037.0 FRAC Sleeve/Port; 13,842.3- 13,844.6 Swell Packer; 13,567.8-13,587.8 Swell Packer; 13,018.5-13,038.5 LINER; 8,170.5-12,476.0 Shoe - Float; 12,472.4-12,476.0 Collar - Landing ; 12,345.9- 12,349.3 Crossover; 12,341.0-12,342.8 Hanger; 12,331.7-12,341.0 Crossover; 12,330.0-12,331.7 Coupling; 12,318.7-12,320.2 Packer (Liner Top); 12,287.9- 12,318.7 Mule Shoe; 12,290.1 Mechanical Locator; 12,288.2 VALVE; 12,265.9 Nipple ; 12,215.7 Packer (Tubing); 12,195.1 Gauge / Pump Sensor; 12,131.9 INJ; 12,064.8 FRAC Sleeve/Port; 11,996.9 INTERMEDIATE; 36.0-8,324.0 Shoe - Float; 8,320.1-8,324.0 Collar - Float; 8,237.6-8,240.5 Nipple - RS; 8,192.1-8,199.0 Hanger; 8,170.5-8,192.1 INJ; 3,282.1 SURFACE; 38.8-2,716.4 Shoe - Float; 2,712.1-2,716.4 Collar - Float; 2,623.1-2,626.4 Nipple - DB, XN, DS, D; 1,287.4 CONDUCTOR; 38.8-120.0 Casing Hanger; 38.8-40.1 Casing Hanger; 36.0-37.4 HANGER; 33.6 WNS INJ CD4-597 ... WELLNAME WELLBORE Page 1/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/3/2022 00:00 5/3/2022 06:00 6.00 MIRU, MOVE DMOB P RIG DOWN SUB AND BOP DECK INTERCONNECTS TO PREP FOR SKIDDING RIG FLOOR,DISASSEMBLE MUD PUMP #2 FOR INSPECTION,CONT. TO CLEAN INSIDE AND OUTSIDE OF CELLAR,STARTED TO BREAK INTERCONNECTS BETWEEN PITS- SUB AND PUMP-PITS,BLEW DOWN TEST PUMP AND FREEZE PROTECTED,STARTED CHECKING TIRE PRESSURES FOR RIG MOVE, 0.0 0.0 5/3/2022 06:00 5/3/2022 12:00 6.00 MIRU, MOVE DMOB P CLEAN AND ORGANIZE IN CELLAR AND BOP DECK, CIRCULATE DEEP CLEAN THROUGH PITS AND ALL MUD LINES, PULL SEATS, DISCHARGE SREENS AND INSPECT SUCTION MANIFOLDS ON BOTH MUD PUMP, PREP TOP DRIVE FOR SERVICING, CHANGE OUT ENCODER ON DRAWWORKS, PREP ST-100 FOR 5 7/8'' DRILL PIPE, CONT. CHECKING RIG TIRES FOR RIG MOVE, GATHER TOOLS FOR REMOVING STAIRS AND LANDING FOR RIG MOVE 0.0 0.0 5/3/2022 12:00 5/3/2022 18:00 6.00 MIRU, MOVE DMOB P REMOVE GAS WATCH SYSTEM FROM FLOW LINE FOR INSPECTION, CLEAN IN PUMP ROOM, RIG DOWN PUMP TO PITS INNERCONNECTS, RIG DOWN TOTCO ANNULUS SENSOR CABLES, CONT CHECKING RIG TIRES FOR RIG MOVE, PRESSURE WASH ON RIG FLOOR, PREP ALL STUDS FOR BOPES, OTECO AND GREY LOCK CONNECTIONS, REMOVE CUTTINGS BOX, EMPTY ALL FLUID FROM MUD PITS TO VAC TRUCK 0.0 0.0 5/3/2022 18:00 5/4/2022 00:00 6.00 MIRU, MOVE DMOB P REMOVE POP OFF LINES @ PUMP- PITS INTERCONNECT, STAGE SPILL KITS AT EACH MODULE FOR RIG MOVE,LOCATE AND CHARGE RADIOS FOR RIG MOVE,SHIP OUT REST OF FLUID FROM PITS, CLEAR SUCTION LINES AND PULL PLUGS ON MIX,CLEANOUT,AND CHARGE PUMPS,WORKING ON PM'S, CONT. HOUSEKEEPING AROUND RIG,MOVE ROUGHNECK HEATER FURTHER AWAY FROM MPD SKID,CLEAN ROCKWASHER PITS,FUCTION AND GREASE POP OFFS,DERRICKHAND WENT UP AND SECURED THE DERRICK FOR RIG MOVE 0.0 0.0 5/4/2022 00:00 5/4/2022 06:00 6.00 MIRU, MOVE DMOB P RAN MOVING HYDRAULIC'S AND FUNCTION TEST STOMPERS, CONT. TO PLUMB IN ROUGHNECK HEATEWR BY MPD SKID, WENT AROUND RIG CLEARED RIG VAC LINES GREASED CHOKE MANIFOLD 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 2/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/4/2022 06:00 5/4/2022 12:00 6.00 MIRU, MOVE DMOB P EMPTY OUT REMAINING FLUID FROM TRIP TANK, CUT AND SLIP DRILL LINE (60 FT.), HOUSE KEEPING ON RIG FLOOR, INVENTORY PARTS AND EQUIPMENT AROUND RIG, PREP SUB STOMPERS FOR RAISING 0.0 0.0 5/4/2022 12:00 5/4/2022 18:00 6.00 MIRU, MOVE DMOB P REMOVE BEAVER SLIDE FOR RIG MOVE AND PLACE IN PIPE SHED, OFF LOAD REMAINING FLUID IN MUD PITS AND ROCK WASHER, MP2'S AROUND RIG, GREASE RIG FLOOR SKIDDING RAILS FOR MOVE, BLOW DOWN AND DISCONNECT STEAM, AIR, VAC, AIR, AND ELECTRICAL GOING TO ROCK WASHER, MODIFY STEAM HEATER STAND IN COLD START ROOM, SECURE SUB RACKS AND AIR SLIP CART ON RIG FLOOR FOR MOVE, SECURE TOOLS AND EQUIPMENT IN PIPE SHED FOR MOVE, CLEAN UP OUT SIDE THE RIG OF ALL LOOSE DEBRIS, MOVE AIR HEATERS FROM AROUND SUB IN PREP FOR SPOTTING CRANE 0.0 0.0 5/4/2022 18:00 5/4/2022 21:00 3.00 MIRU, MOVE DMOB P PLUMB ROUGHNECK HEATER BACK AT MPD PANEL,PREP PIPE SHED STAIRS FOR REMOVAL FOR RIG MOVE,FINISH BLOWING DOWN PRESSURE WASHER AND WATER LINES IN PUMP MODULE,PUT HEATERS ON ICE COVERING POWER LINES TO BE MOVED FOR RIG MOVE, CD4-597 2 04-May-2022 2 0.0 0.0 5/4/2022 21:00 5/5/2022 00:00 3.00 MIRU, MOVE DMOB P CLEAN AND SUCK OUT CELLAR BOX, BLOW DOWN WATER ARCOSS RIG, PREP PINS AND KEEPERS ON PIPE SHED LANDING FOR REMOVAL, HOUSE KEEPING AROUND RIG, DISCONNECT WATER LINES AROUND RIG 0.0 0.0 5/5/2022 00:00 5/5/2022 12:00 12.00 MIRU, MOVE DMOB P ORGINIZING IN MUD PITS, CONT. HOUSE KEEPING AROUND RIG , INVENTORY TOOLS AND EQUIPMENT, REPAIR LIGHTS, MAKE LIST OF LIGHT THAT ELECTRICIAN WILL REPAIR, MOVE CHOKE AWAY FROM WELL TO MOVE SUB OUT. GREASE ALL PINS INSURE ALL HAVE SAFETY PINS 0.0 0.0 5/5/2022 12:00 5/6/2022 00:00 12.00 MIRU, MOVE DMOB P CONT. ORGANIZING IN MUD PITS, CONT. HOUSEKEEPING AROUND RIG, INVENTORY LIGHTS AROUND RIG THAT NEED REPAIR, PLACE PRODUCTION TREE BEHIND WELL (CD4-597),PREP CD4 FOR LAYING RIG MATS,REPAIR BOILER BLOWDOWN LINE. RUN ALL COLD STARTS, ELECTRICIAN UNPLUGS ALL MODS, BLOW DOWN STEAM SYSTEM, PUT POWER MOD, PUMP MOD, AND PIPESHED ON SUSPENSION 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 3/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/6/2022 00:00 5/6/2022 06:00 6.00 MIRU, MOVE DMOB P CONT. PREP CD4-597 RIG MATS. PREP STAGE UP SPOT ON CD1 FOR PIPE SHED. LAY TRANSITION MATS ON PIPE SHED COMPLEX, PUMP COMPLEX, AND MOTOR COMPLEX. GET RIG PAINT INVENTORY. 0.0 0.0 5/6/2022 06:00 5/6/2022 09:00 3.00 MIRU, MOVE DMOB P CONT. PREP CD4-597 RIG MATS. PREP STAGE UP SPOT ON CD1 FOR PIPE SHED. LAY TRANSITION MATS ON PIPE SHED COMPLEX, PUMP COMPLEX, AND MOTOR COMPLEX. GET RIG PAINT INVENTORY 0.0 0.0 5/6/2022 09:00 5/6/2022 09:45 0.75 MIRU, MOVE MOB P MOVE AND STAGE ROCKWASHER 0.0 0.0 5/6/2022 09:45 5/6/2022 11:00 1.25 MIRU, MOVE MOB P MOVE AND STAGE PIPESHED 0.0 0.0 5/6/2022 11:00 5/6/2022 11:45 0.75 MIRU, MOVE MOB P MOVE AND STAGE MOTOR MOD 0.0 0.0 5/6/2022 11:45 5/6/2022 12:00 0.25 MIRU, MOVE MOB P MOVE AND STAGE PUMP MOD 0.0 0.0 5/6/2022 12:00 5/6/2022 12:15 0.25 MIRU, MOVE MOB P CONT. TO MOVE AND STAGE PUMP MOD 0.0 0.0 5/6/2022 12:15 5/6/2022 12:45 0.50 MIRU, MOVE MOB P MOVE AND STAGE PITS 0.0 0.0 5/6/2022 12:45 5/6/2022 14:30 1.75 MIRU, MOVE DMOB P SKID RIG FLOOR 0.0 0.0 5/6/2022 14:30 5/6/2022 15:15 0.75 MIRU, MOVE DMOB P RAISE AND SECURE STOMPERS 0.0 0.0 5/6/2022 15:15 5/6/2022 16:15 1.00 MIRU, MOVE DMOB P INSTALL TONGUE ON SUB. MOVE PIPESHED AND MOTOR MOD FROM CD1 TO CD4 @ 15:30 0.0 0.0 5/6/2022 16:15 5/6/2022 17:30 1.25 MIRU, MOVE DMOB P PICK AIR HEATER OFF PITS ROOF. PIPESHED AND MOTOR MOD ARRIVE @ CD4 @ 16:30 0.0 0.0 5/6/2022 17:30 5/6/2022 18:00 0.50 MIRU, MOVE DMOB P RAISE AND PIN CELLAR DOOR 0.0 0.0 5/6/2022 18:00 5/6/2022 19:00 1.00 MIRU, MOVE MOB P STAGE UP PUMP AND PITS MODS @ EDGE OF CD-1 0.0 0.0 5/6/2022 19:00 5/6/2022 20:30 1.50 MIRU, MOVE MOB P MOVE PUMP & PITS MODS T/ CD-4 AND STAGE. 0.0 0.0 5/6/2022 20:30 5/7/2022 00:00 3.50 MIRU, MOVE MOB P MOVE SUB OFF CD-1 WD-03 AND STAGE @ EDGE OF PAD. MOVE RIG MATS, PULL HERCULITE AND WAIT FOR ALPINE RUNWAY TO OPEN. 0.0 0.0 5/7/2022 00:00 5/7/2022 02:30 2.50 MIRU, MOVE MOB P MOVE SUB AND ROCKWASHER F/ CD-1 T/ CD-4 110.0 110.0 5/7/2022 02:30 5/7/2022 03:30 1.00 MIRU, MOVE RURD P STAGE SUB AND LAY RIG MATS F/ SUB. 0.0 0.0 5/7/2022 03:30 5/7/2022 06:00 2.50 MIRU, MOVE RURD P SPOT SUB AND SET STOMPERS 0.0 0.0 5/7/2022 06:00 5/7/2022 07:00 1.00 MIRU, MOVE RURD P SKID RIG FLOOR, REMOVE TONGUE ON SUB 0.0 0.0 5/7/2022 07:00 5/7/2022 08:00 1.00 MIRU, MOVE RURD P SPOT PITS 0.0 0.0 5/7/2022 08:00 5/7/2022 09:00 1.00 MIRU, MOVE RURD P SPOT PUMP MOD 0.0 0.0 5/7/2022 09:00 5/7/2022 10:00 1.00 MIRU, MOVE RURD P SPOT MOTOR MOD 0.0 0.0 5/7/2022 10:00 5/7/2022 11:00 1.00 MIRU, MOVE RURD P SPOT ROCKWASHER 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 4/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/7/2022 11:00 5/7/2022 12:00 1.00 MIRU, MOVE RURD P SPOT PIPESHED 0.0 0.0 5/7/2022 12:00 5/7/2022 18:00 6.00 MIRU, MOVE RURD P M/U ALL INTERCONNECTS, CHOKE/KILL HOSES ON THE SUB. CHECK LANDINGS AROUND THE RIG, ELECTRICIAN PLUG ALL MODS IN, GET STEAM, WATER, AIR GOING AROUND RIG. WORK ON PRE-ACCEPTANCE CHECK LIST 0.0 0.0 5/7/2022 18:00 5/8/2022 00:00 6.00 MIRU, MOVE RURD P CONT. WORKING ON RIG ACCEPTANCE CHKLIST. CONNECT CHRG PUMP SUCTION/DISCHARGE LINES, CONNECT MPD LINES IN BOP DECK. CHK/KILL LINES, LWR MEZZ. PLATFORM. CLEAN PIN POCKETS ON PIPE SHED STAIR PAD EYES. RIG UP SKATE RIG ACCEPTED FOR MAINTANCE AT 2400HRS 0.0 0.0 8/1/2022 00:00 8/1/2022 01:00 1.00 SURFAC, DRILL SFTY P CONT. TAKING ON MUD TO PITS, PJSM ON PICKING UP BHA AND HANDLING PROCEDURES 0.0 0.0 8/1/2022 01:00 8/1/2022 03:15 2.25 SURFAC, DRILL BHAH P P/U AND M/U PARTIAL DIRECTIONAL BHA AS PER WELL PLAN TIH 100' 0.0 0.0 8/1/2022 03:15 8/1/2022 03:30 0.25 SURFAC, DRILL DRLG P WASH DOWN F/ 100' TO 114'MD @ 630 GPM 517 PSI 55% FLOW 20 RPM 1K TQ CLEAN OUT CONDUCTOR F/ 114' TO 131' @ 630 GPM 633 PSI 55 % 20 RPM 1-3K WOB 1-3 TQ ADT.33 0.0 131.0 8/1/2022 03:30 8/1/2022 03:45 0.25 SURFAC, DRILL TRIP P POOH F/ 131' MDS TO 43' @ 480 GPM P/U WT 53K 131.0 41.0 8/1/2022 03:45 8/1/2022 04:00 0.25 SURFAC, DRILL TRIP P RACK STAND BACK OF HWDP L/D XO 41.0 41.0 8/1/2022 04:00 8/1/2022 06:00 2.00 SURFAC, DRILL BHAH P P/U SURFACE BHA AS PER SLB AND SCIENTIFIC GYRO REPS F/ 43' TO 131' 41.0 131.0 8/1/2022 06:00 8/1/2022 06:45 0.75 SURFAC, DRILL SRVY P SHOOT GYRO SURVEY @ CONDUCTOR 131.0 131.0 8/1/2022 06:45 8/1/2022 12:00 5.25 SURFAC, DRILL DDRL P DRILL 16” SURFACE HOLE TAKING GYRO SURVEYS. F/ 128‘ MD - T/ 464‘ MD 464‘ TVD, WOB = 2-10K, GPM = 625, PSI ON = 855, PSI OFF = 805, RPM = 40, TQ ON = 5, TQ OFF = 3, FLOW OUT = 63%, ECD = 11.62 PPG, P/U WT = 76K, S/O WT = 73K, AST=1.48, ART = .72, ADT =2.20 , TOTAL BIT HRS =2.20, TOTAL JARS = 0 131.0 464.0 8/1/2022 12:00 8/1/2022 18:00 6.00 SURFAC, DRILL DDRL P DRILL 16” SURFACE HOLE TAKING GYRO SURVEYS. F/ 464‘ MD - T/ 834‘ MD 828‘ TVD, WOB = 10-12K, GPM = 625, PSI ON = 1067, PSI OFF = 980, RPM = 40, TQ ON = 6- 8, TQ OFF = 3, FLOW OUT = 65%, ECD = 11.39 PPG, P/U WT = 86K, S/O WT = 84K, ROT= 85 DROP SOAP STICKS AND SAPP EACH CONNECTION 464.0 834.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 5/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/1/2022 18:00 8/2/2022 00:00 6.00 SURFAC, DRILL DDRL P DRILL 16” SURFACE HOLE F/ 834‘ MD - T/ 1,225‘ MD 1,220‘ TVD, WOB = 7- 13K, GPM = 650, PSI ON = 1,139, PSI OFF = 1,028, RPM = 40, TQ ON = 4-8K, FLOW OUT = 57%, ECD = 11.3 PPG, P/U WT = 98K, S/O WT = 98K, RT WT = 95K, AST= 2.59, ART = , ADT = 3.37, TOTAL BIT HRS = 8.16, TOTAL JARS = 3.95 INCREASE IN WOOD CUTTINGS @ 595' MD GRAVEL TO CLAY @ 615' 834.0 1,225.0 8/2/2022 00:00 8/2/2022 06:00 6.00 SURFAC, DRILL DDRL P DRILL 16” SURFACE HOLE F/ 1225' MD - T/ 1774' MD ‘ TVD, WOB = 7-13K, GPM = 725, PSI ON = 1,1459, PSI OFF = 1,258, RPM = 40, TQ ON = 4-8K, FLOW OUT = 57%, ECD = 11.3 PPG, P/U WT = 98K, S/O WT = 98K, RT WT = 95K, AST= 2.59, ART = , ADT = 3.37, TOTAL BIT HRS = 8.16, TOTAL JARS = 3.95 INCREASE IN WOOD CUTTINGS @ 595' MD GRAVEL TO CLAY @ 615' MWD SURVEY START AT 1290' 1,225.0 1,774.0 8/2/2022 06:00 8/2/2022 12:00 6.00 SURFAC, DRILL DDRL P DRILL 16” SURFACE HOLE F/ 1774‘ MD - T/ 2137‘ MD 2010‘ TVD, WOB = 20-25K, GPM = 825, PSI ON = 1830, PSI OFF = 1650, RPM = 55, TQ ON = 6-10K, FLOW OUT = 65%, ECD = 11.32 PPG, P/U WT = 125K, S/O WT = 109K, RT WT = 114K, AST= 1.87, ART = 6.30, ADT = 8.17, TOTAL BIT HRS = 19.76, TOTAL JARS = 15.55 1,774.0 2,137.0 8/2/2022 12:00 8/2/2022 18:00 6.00 SURFAC, DRILL DDRL P DRILL 16” SURFACE HOLE F/ 2137‘ MD - T/ 2415‘ MD 2196‘ TVD, WOB = 25K, GPM = 900 PSI ON = 2113, PSI OFF = 1965, RPM = 55, TQ ON = 7K, FLOW OUT = 66%, ECD = 11.06 PPG, P/U WT = 123K, S/O WT = 112K, RT WT = 113K, PUMP BIT BALLING SWEEPS EVERY 2 STANDS. 2,137.0 2,415.0 8/2/2022 18:00 8/2/2022 18:30 0.50 SURFAC, DRILL CIRC P HOLE UNLOADED, GET PITS AND ROCK CLEANED AND READY TO GO AGAIN 2,415.0 2,415.0 8/2/2022 18:30 8/3/2022 00:00 5.50 SURFAC, DRILL DDRL P DRILL 16” SURFACE HOLE F/ 2,415‘ MD - T/ 2,624‘ MD 2,330‘ TVD, WOB = 23-25K, GPM = 900, PSI ON = 2,147, PSI OFF = 2,100, RPM = 40, TQ ON = 7-9K, FLOW OUT = 68%, ECD = 11.24 PPG, P/U WT = 127K, S/O WT = 111K, RT WT = 118K, AST= 1.47, ART = 7.18, ADT = 8.65, TOTAL BIT HRS = 28.41, TOTAL JARS = 24.20 2,415.0 2,624.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 6/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/3/2022 00:00 8/3/2022 01:00 1.00 SURFAC, DRILL DDRL P DRILL 16” SURFACE HOLE F/ 2624‘ MD - T/ 2,646‘ MD 2,330‘ TVD, WOB = 23-25K, GPM = 900, PSI ON = 2,147, PSI OFF = 2,100, RPM = 40, TQ ON = 7 -9K, FLOW OUT = 68%, ECD = 11.24 PPG, P/U WT = 127K, S/O WT = 111K, RT WT = 118K, 2,624.0 2,646.0 8/3/2022 01:00 8/3/2022 02:00 1.00 SURFAC, DRILL CIRC T CIRCULATED HOLE CLEAN WHILE WAITING ON CPAI GEOLIST FOR FINAL MD AND TVD. PC SOFT WARE FOR GEOLOGIST NOT WORKING PROPERLY. FIXED PC AND CONFIRMED DEPTHS DD AND CPAI REP. 2,646.0 2,646.0 8/3/2022 02:00 8/3/2022 03:00 1.00 SURFAC, DRILL DDRL P DRILL 16” SURFACE HOLE F/ 2,648‘ MD - T/ 2721‘ MD 2,330‘ TVD, WOB = 23-25K, GPM = 900, PSI ON = 2,147, PSI OFF = 2,100, RPM = 40, TQ ON = 7 -9K, FLOW OUT = 68%, ECD = 11.24 PPG, P/U WT = 127K, S/O WT = 111K, RT WT = 118K, AST= 1.47, ART = 8.27, ADT = 9.5, TOTAL BIT HRS = 29.39, TOTAL JARS = 25.18 2,646.0 2,721.0 8/3/2022 03:00 8/3/2022 03:15 0.25 SURFAC, DRILL SRVY P OBTAIN FINAL SURVEY AND TORQUE AND DRAG VALVES 2,721.0 2,721.0 8/3/2022 03:15 8/3/2022 05:00 1.75 SURFAC, CASING CIRC P CIRCULUTE 1 B/U RACK STAND BACK CIRCULATE ANOTHER B/U RACK STAAND BACK 2,721.0 2,258.0 8/3/2022 05:00 8/3/2022 05:15 0.25 SURFAC, CASING OWFF P FLOW CHECK WELL WELL STATIC 2,258.0 2,258.0 8/3/2022 05:15 8/3/2022 12:00 6.75 SURFAC, CASING BKRM P BROOH F/ 2258' MD TO 1675'' MD @ 900 GPM 1507 PSI RPM 40 TQ ECD'S F/O 67 % P/U WT 95k 2,258.0 1,675.0 8/3/2022 12:00 8/3/2022 16:00 4.00 SURFAC, CASING BKRM P BROOH F/ 1675‘ MD - T/ 1307‘ MD, W/ GPM = 900, PSI = 1556, RPM = 40, TQ = 3K. F/O = 67%, ECD = 11.07PPG, P/U WT = 95K. ORIENTATE HIGH SIDE. 1,675.0 1,307.0 8/3/2022 16:00 8/3/2022 16:45 0.75 SURFAC, CASING OWFF P OWFF ATTEMPT TO PULL ON ELEVATORS 30K OVER PULL OBSERVED @ 1286' MD. KELLY UP PUMP OUT OF HOLE 1,307.0 1,307.0 8/3/2022 16:45 8/3/2022 22:30 5.75 SURFAC, CASING TRIP P BROOH F/ 1307' MD T/ 743' MD @ 500 GPM, 660PSI, 60% F/O, P/U 90K 1,307.0 743.0 8/3/2022 22:30 8/3/2022 23:00 0.50 SURFAC, CASING TRIP P POOH ON ELEVATORS F/ 743' MD T/ 188' MD 743.0 188.0 8/3/2022 23:00 8/4/2022 00:00 1.00 SURFAC, CASING OTHR P B/D TOP DRIVE, HOLD PJSM F/ L/D BHA 188.0 188.0 8/4/2022 00:00 8/4/2022 03:00 3.00 SURFAC, CASING BHAH P L/D SURFACE BHA PER SDI AND SLB REP'S 188.0 0.0 8/4/2022 03:00 8/4/2022 05:00 2.00 SURFAC, CASING PUTB P CLEAN AND CLEAR RIG FLOOR R/U CASING EQUIPMENT 0.0 0.0 8/4/2022 05:00 8/4/2022 06:00 1.00 SURFAC, CASING PUTB P P/U AND DUMMY RUN HANGER AND LANDING JT. 0.0 0.0 8/4/2022 06:00 8/4/2022 07:00 1.00 SURFAC, CASING PUTB P PERFORM DUMMY RUN W/ 13 3/8" HANGER AND LANDING JT 0.0 0.0 8/4/2022 07:00 8/4/2022 08:00 1.00 SURFAC, CASING PULD P CONT. R/U CSG RUNNING EQUIPMENT 0.0 0.0 8/4/2022 08:00 8/4/2022 08:15 0.25 SURFAC, CASING SFTY P HOLD PJSM FOR RUNNING 13 3/8" CSG 0.0 0.0 8/4/2022 08:15 8/4/2022 09:00 0.75 SURFAC, CASING PUTB P M/U 13 3/8" 68# L-80 HYD 563 SHOE TRACK F/ SURFACE T/ 179' MD. M/U TQ= 25K FT/LBS 0.0 179.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 7/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/4/2022 09:00 8/4/2022 09:30 0.50 SURFAC, CASING OWFF P TEST FLOATS 179.0 179.0 8/4/2022 09:30 8/4/2022 12:00 2.50 SURFAC, CASING PUTB P CONT. TO RUN 13 3/8" 68# L-80 HYD 563 F/ 179' T/ 863' MD. S/O WT= 75K. M/U TQ= 25K FT/LBS. FILLING ON THE FLY VIA VOLANT, TOPPING OFF EVERY 10 JTS. MONITORING DISPLACEMENT VIA PIT #5. 179.0 863.0 8/4/2022 12:00 8/4/2022 15:00 3.00 SURFAC, CASING PUTB P CONT. TO RUN 13 3/8" 68# L-80 HYD 563 F/ 863' T/ 1413' MD. S/O WT= 110K. M/U TQ= 25K FT/LBS. FILLING ON THE FLY VIA VOLANT, TOPPING OFF EVERY 10 JTS. MONITORING DISPLACEMENT VIA PIT #5. 863.0 1,413.0 8/4/2022 15:00 8/4/2022 16:00 1.00 SURFAC, CASING CIRC P CIRCULATE STRING VOLUME STAGING UP TO 8 BPM ICP 136 PSI FCP 137 PSI, P/U WT=119K. S/O WT=112, 2165 STROKES TOTAL 1,413.0 1,413.0 8/4/2022 16:00 8/4/2022 21:00 5.00 SURFAC, CASING PUTB P CONT. TO RUN 13 3/8" 68# L-80 HYD 563 F/ 1413 T/ 2664' MD. S/O WT= 151K. M/U TQ= 25K FT/LBS. FILLING ON THE FLY VIA VOLANT, TOPPING OFF EVERY 10 JTS. MONITORING DISPLACEMENT VIA PIT #5. 1,413.0 2,664.0 8/4/2022 21:00 8/4/2022 22:00 1.00 SURFAC, CASING CIRC P CIRC B/U AND RECIP. F/ 2,664' MD T/ 2,664' MD, STAGING RATE UP TO 8 BPM, 182 PSI, 48% F/O. TOTAL STKS PUMPED= 1,960 (231 BBLS) 2,664.0 2,664.0 8/4/2022 22:00 8/4/2022 22:45 0.75 SURFAC, CASING PUTB P M/U 10' PUP, HANGER AND LANDING JT F/ 2,664' MD T/ 2,677' MD 2,664.0 2,677.0 8/4/2022 22:45 8/4/2022 23:00 0.25 SURFAC, CASING WASH P WASH DOWN LANDING JT F/ 2,677' MD T/ 2,716' MD @ 3 BPM, 96 PSI, 31% F/O, S/O WT= 160K 2,677.0 2,716.0 8/4/2022 23:00 8/4/2022 23:30 0.50 SURFAC, CASING CIRC P CIRC AND RECIP F/ 2,716' MD T/ 2,710' MD STAGING PUMPS TO 8 BPM, 200 PSI, 45% F/O. TOTAL STKS PUMPED= 2,221 (262 BBLS) 2,716.0 2,710.0 8/4/2022 23:30 8/5/2022 00:00 0.50 SURFAC, CEMENT OTHR P B/D TOP DRIVE, M/U CEMENT HOSE TO VOLANT 2,710.0 2,710.0 8/5/2022 00:00 8/5/2022 01:45 1.75 SURFAC, CEMENT CIRC P CIRC AND RECIP F/ 2716' TO 2710' MD WITH CEMENT HOSE STAGING RATE UP TO 8 BPM 338 PSI 42% F/O TOTAL STROKES 5286 624 BBLS 2,716.0 2,716.0 8/5/2022 01:45 8/5/2022 02:45 1.00 SURFAC, CEMENT PRTS P PRESS TEST CEMENT LINES 500PSI LOW 3500PSI HIGH GOOD TEST, WHILE MOVING REMAIN MUD IN PITS TO TRUCKS FOR CEMENNT JOB 2,716.0 2,716.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 8/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/5/2022 02:45 8/5/2022 07:30 4.75 SURFAC, CEMENT CMNT P CEMENTERS PUMP 99.5 BBLS 10.7# MUD PUSH II, DROP BOTTOM PLUG. PUMP 447 BBLS 11# LEAD CEMENT FOLLOWED BY 73 BBLS 15.8# TAIL CEMENT, DROP TOP PLUG. PUMP 10 BBLS FRESH WATER. SWAP OVER TO RIG PUMP AND CHASE PLUG @ 7 BPM, 515 PSI, 54% F/O. @ 3100 STKS AWAY SLOW PUMPS T/ 3 BPM, 386 PSI, 45% F/O. BUMP PLUG @ 3232 STKS. HOLD 890 PSI FOR 5 MIN, BLEED OFF AND CHECK FLOATS (GOOD). CIP @ 07:30, 201 BBLS CEMENT TO SURFACE 2,716.0 2,716.0 8/5/2022 07:30 8/5/2022 12:00 4.50 SURFAC, WHDBOP CLEN P CLEAN CEMENT VALVES, CLEAN RISER AND DRIP PAN, CLEAN SURFACE LINES IN MUD PITS, AND OFF LOAD AND CLEAN ROCKWASHER, PULL LANDING JOINT, START TO RIG DOWN/ LAY DOWN CASING EQUIPMENT. 0.0 0.0 8/5/2022 12:00 8/5/2022 18:00 6.00 SURFAC, WHDBOP RURD P FINISH RIG DOWN/ LAY DOWN CASING EQUIPMENT. NIPPLE DOWN RISERS AND L/D MOUSEHOLE, OPENED AND PINNED CELLAR DOOR T/ GET WELL HEAD INTO CELLAR T/ RIG UP AND ORIENTATE , SIMOPS CONT. T/ CLEAN SURFACE LINES, EQUIPMENT AND ROCKWASHER, PUT CHOKE FLANGE BACK ON STACK AND ORIENTATE 90 CORRECTLY FOR KILL LINE, REMOVED 4" VALVES FROM CONDUCTER AND CAPPED, GET SPACER SPOOL TO THE CELLAR AND MAKE UP TO WELL HEAD 0.0 0.0 8/5/2022 18:00 8/6/2022 00:00 6.00 SURFAC, WHDBOP NUND P NIPPLE UP BOP STACK, CHOKE, KILL AND MPD EQUIPMENT PER BEYOND REPS SIMOPS- CONT. CLEANING OUT ROCK WASHER AND MUD PITS 0.0 0.0 8/6/2022 00:00 8/6/2022 02:00 2.00 SURFAC, WHDBOP NUND P NIPPLE UP BOP STACK, CHOKE, KILL AND MPD EQUIPMENT PER BEYOND REPS SIMOPS- CONT. CLEANING OUT ROCK WASHER AND MUD PITS 0.0 0.0 8/6/2022 02:00 8/6/2022 03:00 1.00 SURFAC, WHDBOP MPSP P M/U TESTY PLUG AND INSTALL PER FMC REP 0.0 0.0 8/6/2022 03:00 8/6/2022 04:00 1.00 SURFAC, WHDBOP PRTS P FLOOD STACK, TEST MPD RCD HEAD AND ORBIT VALVE T/ 250 1200 PSI 0.0 0.0 8/6/2022 04:00 8/6/2022 05:00 1.00 SURFAC, WHDBOP BOPE P CONT. R/U TO TESTING EQUIP FOR BOPE TEST, PRESSURE UP KUMMY UNIT 0.0 0.0 8/6/2022 05:00 8/6/2022 06:00 1.00 SURFAC, WHDBOP BOPE P PERFORM SHELL TEST ON STACK AND CHOKE MANIFOLD, CKOKE AND KILL LINES 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 9/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/6/2022 06:00 8/6/2022 12:00 6.00 SURFAC, WHDBOP BOPE T PERFORM SHELL TEST ON BOPE PRIOR TO CHARTED TEST, DISCOVERED LEAKS AT CHOKE HOSE OTECO CLAMP SO REMOVED CLAMP AND REPLACED GASKET, ATTEMPTED TO PERFORM SHELL TEST AGAIN AND DISCOVERED LEAK WHERE THE ANNULAR MAKES UP TO UPPER RAMS, THEREFORE WE HAD TO REMOVE STACK YOKE TO SWEENEY WRENCH STUDS TIGHT. 0.0 0.0 8/6/2022 12:00 8/6/2022 15:00 3.00 SURFAC, WHDBOP BOPE T UPON TRYING TO TEST AFTER ADDRESSING LEAKS IT WAS DETERMINED THAT THE ANNULAR, YOKE , AND MPD ROTATING HEAD NEEDED TO BE REMOVED TO CHANGE OUT API RING BELOW ANNULAR, C/O API RING AND RE-INSTALLED ANNULAR, ROTATING HEAD, AND TRIP NIPPLE, 0.0 0.0 8/6/2022 15:00 8/6/2022 16:30 1.50 SURFAC, WHDBOP BOPE T TROUBLESHOOT MPD RCD CLAMP 0.0 0.0 8/6/2022 16:30 8/6/2022 18:00 1.50 SURFAC, WHDBOP BOPE T CONT. TO ADDRESS LEAKS ON STACK AND CHOKE LINE 0.0 0.0 8/6/2022 18:00 8/6/2022 18:30 0.50 SURFAC, WHDBOP BOPE T W/ 5 7/8" TEST JT TEST ANNULAR, CV # 1, 12, 13, 14, RIG FLOOR KILL LINE T/ 250 LOW, 5,000 HIGH FOR 5/5 0.0 0.0 8/6/2022 18:30 8/7/2022 00:00 5.50 SURFAC, WHDBOP BOPE T ADDRESS LEAKS ON CHOKE LINE, AND BOP STACK. OPEN UPPER RAM DOORS AND INSPECT 3 1/2" X 6" RAM SEALS, OBSERVE MINOR DAMAGE ON BOTH RAMS, C/O SEALS FOR NEW ONES. 0.0 0.0 8/7/2022 00:00 8/7/2022 00:30 0.50 SURFAC, WHDBOP BOPE T PERFORM SHELL TEST ON BOP STACK, CHOKE LINES, CHOKE MANIFOILD TO 5000 PSI GOOD TEST. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 10/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/7/2022 00:30 8/7/2022 05:00 4.50 SURFAC, DRILLOUT BOPE P TEST BOPE ALL TESTS T/ 250 LOW 5,000 HIGH FOR 5 CHARTED MIN. W/ EXCEPTION OF MANUAL OPERATED & SUPER CHOKE TESTED T/ 250 LOW & 2,000 PSI FOR 5 CHARTED MIN, W/ 5 7/8" TEST JT TEST ANNULAR, 3 1/2" X 6" UPR, 3 1/2" X 6" LPR, TEST CHOKE VALVES 1-15, MANUAL OPERATED & SUPER CHOKE, CHOKE & KILL MANUALS & HCR'S, 4" VALVE ON KILL LINE, 5 7/8" FOSV X2, 5 7/8" DART VALVE, UPPER & LOWER IBOP; BLIND/ SHEAR RAMS; PERFORM KOOMEY DRAWDOWN, ACC = 3,025 PSI. MANIF. = 1,500 PSI. ACC = 1,800 PSI AFTER ALL FUNCTIONS ON BOTTLES, 8 SEC FOR 200 PSI. BUILD W/ 2 ELEC. PUMPS, 59 SEC T/ BUILD FULL SYS. PRESSURE W/ 2 ELEC. & 2 AIR PUMPS, CLOSING TIMES ANNULAR = 10 SEC. UPR = 7 SEC. BLIND / SHEARS = 7 SEC. LPR = 7 SEC. CHOKE HCR = 2 SEC. KILL HCR = 2 SEC; TEST PVT GAIN/LOSS AND FLOW OUT ALARMS, TEST LEL AND H2S ALARMS; WITNESSED BY AOGCC REP AUSTIN MCLEOD 0.0 0.0 8/7/2022 05:00 8/7/2022 09:00 4.00 SURFAC, DRILLOUT RURD P R/D TESTING EQUIPMENT, PULL TEST PLUG, SET WEAR RING. WEAR RING ID= 12 3/8", LENGTH= 42", SIMOPS BLOWN TESTING EQUIPMENT/ CLEAN/CLEAR FLOOR TO PREP TO PICKUP BHA 0.0 0.0 8/7/2022 09:00 8/7/2022 09:30 0.50 SURFAC, DRILLOUT SFTY P PJSM ON P/U BHA/TRIP IN THE HOLE. 0.0 0.0 8/7/2022 09:30 8/7/2022 12:00 2.50 SURFAC, DRILLOUT BHAH P P/U BHA/ LOAD SOURCE PER SLB REP 0.0 429.0 8/7/2022 12:00 8/7/2022 14:30 2.50 SURFAC, DRILLOUT BHAH P CONT. P/U BHA/ LOAD SOURCE PER SLB REP 429.0 429.0 8/7/2022 14:30 8/7/2022 16:00 1.50 SURFAC, DRILLOUT TRIP P RIH FROM SURFACE TO 429 MD' T/ 2407 MD', SO= 107K 429.0 2,407.0 8/7/2022 16:00 8/7/2022 17:00 1.00 SURFAC, DRILLOUT CIRC P STAGE UP T/ 900 GPM AND WASH F/ 2407' MD' T/ 2497 MD' , PSI= 1490, FO= 65% 2,407.0 2,497.0 8/7/2022 17:00 8/7/2022 18:00 1.00 SURFAC, DRILLOUT RURD P R/U TO TEST CASING, PURGE AIR FROM ALL LINES 2,497.0 2,497.0 8/7/2022 18:00 8/7/2022 18:45 0.75 SURFAC, DRILLOUT PRTS P @ 2,497' MD TEST CASING TO 3,000 PSI FOR 30 MIN. 5 BBLS TO PRESSURE UP, 5 BBLS BLED OFF 2,497.0 2,497.0 8/7/2022 18:45 8/7/2022 19:30 0.75 SURFAC, DRILLOUT RURD P R/D TESTING EQUIPMENT 2,497.0 2,497.0 8/7/2022 19:30 8/7/2022 20:00 0.50 SURFAC, DRILLOUT WASH P WASH DOWN F/ 2,497' MD T/ 2,621.72' MD @ 600 GPM, 740 PSI, 56% F/O, 40 RPM, 4-8K TQ, P/U WT= 125K, S/O WT= 106K, ROT WT= 114K. TAG PLUG @ 2,621.72' MD 2,497.0 2,622.0 8/7/2022 20:00 8/7/2022 21:00 1.00 SURFAC, DRILLOUT DRLG P DRILL PLUGS AND FLOAT COLLAR F/ 2,621.72' MD T/ 2,623.7' MD @ 600 GPM, 741 PSI, 57% F/O, 40 RPM, 5-9K TQ 2,622.0 2,622.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 1. Operations Abandon Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Suspend Perforate Other Stimulate Alter Casing Change Approved Program Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well Other: ______________________ ConocoPhillips Alaska, Inc. Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 18,350 feet feet true vertical 4,360 feet feet Effective Depth measured 18,350 feet 12,288 / 12,195 feet true vertical 4,360 feet 4,031 / 4,020 feet Perforation depth Measured depth N/A feet True Vertical depth N/A feet Tubing (size, grade, measured and true vertical depth) 4.5" 12.6# L80 12,323' MD 4,036' TVD SLZXP LTP 12,288' MD 4,031' TVD Packers and SSSV (type, measured and true vertical depth) HAL TNT 12,195' MD 4,020' TVD 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Contact Name: Contact Email: Authorized Title: Contact Phone: 3090 5410, 8530 5020 5750 7240, 11220 Burst Collapse 2260 120 2385 3447 4059 4-1/2" 8324 12476 18,340 4355 7" measuredPlugs Junk measured 1.633MMlbs 20/40 Wan-Li Ceramic proppant, 51,748 lbs of 100 Mesh, 758 bbls of seawater, and 250 treating pressure/2450 BHG pressure. Length 120 2716 Size Conductor Surface Intermediate 20" 13-3/8" 9-5/8" Intermediate Liner 8324 4306 6062 Casing STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 222-019 50-103-20839-00-00 Job logs attached 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: ADL380077, ADL384211, ADL380082, ADL388903, ADL391587 Colville Delta - Narwhal Undefined Oil P.O. Box 100360 Anchorage, AK 99510-03603. Address: CD4-597 measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 0 5000 0 0 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 0 Gas-Mcf MD 120 2716 15,616' - 18,236' MD 0 Structural TVD 323-101 Sr Pet Eng: 7500 Sr Pet Geo: Sr Res Eng: Authorized Name and Digital Signature with Date: WINJ WAG 0 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 0 369 8430 907-265-6462 Baskoro Tejo baskoro.tejo@cop.com Completions Engineer Development Service GINJ SUSP SPLUG Gas G Form 10-404 Revised 10/2021 Submit Within 30 days of Operations Baskoro Tejo July 31, 2023 g BaBaBaBaaBsksssoro Tejo By Grace Christianson at 9:49 am, Aug 01, 2023 Prepared By: Keegan Lambe Daniel Faur Nannook Crew Intervals 1-7 Notice: Although the information contained in this report is based on sound engineering practices, the copyright owner(s) does (do) not accept any responsibility whatsoever, in negligence or otherwise, for any loss or damage arising from the possession or use of the report whether in terms of correctness or otherwise. The application, therefore, by the user of this report or any part thereof, is solely at the user’s own risk. CD4-597 Conoco Phillips Harrison Bay County, AK Post Job Report Stimulation Treatment API: 50-103-20839 Prepared for: Baskoro Tejo July 23, 2023 A-Sand Formation 30# Delta Frac Table of Contents Section Page(s) Executive Summary Wellbore Information Actual Design Interval Summary Fluid System-Proppant Summary Interval 1 Plots Interval 2 Plots Interval 3 Plots Interval 4 Plots Interval 5 Plots Interval 6 Plots Interval 7 Plots Appendix Well Summary Chemical Summary Planned Design Water Straps 7-21 Water Straps 7-22 Water Straps 7-23 Water Analysis 7-21 Water Analysis 7-22 Water Analysis 7-23 Real-Time QC Event Log 7-21 Event Log 7-22 Event Log 7-23 Prejob Break Test Day 1 Fann 15 Min Test Interval 1 Fann 15 Min Test Interval 2 Fann 15 Min Test Interval 3 Fann 15 Min Test Interval 4 Fann 15 Min Test Interval 5 Fann 15 Min Test Interval 6 Fann 15 Min Test Interval 7 38 - 41 42 - 55 56 - 60 8 - 18 19 20 - 33 34 - 37 61 - 68 69 - 72 73 74 75 76 - 77 78 79 4 5 6 - 7 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 Conoco Phillips - CD4-597 TOC 2 527,953 gallons of 30# Delta 99,774 gallons of 30# Linear 0 gallons of Seawater 6,100 gallons of Freeze Protect 956,200 pounds of Wanli 20/40 Ceramic 35,000 pounds of 100M 514,015 gallons of 30# Delta 108,344 gallons of 30# Linear 2,956 gallons of Seawater 872,804 pounds of Wanli 20/40 Ceramic 36,000 pounds of 100M Thank you, Keegan Lambe Senior Technical Professional Halliburton maintains a continuous quality improvement process and appreciates any comments or suggestions that you may have. Halliburton again thanks you for the opportunity to perform service work on this well. We hope to be your solutions provider for future projects. Engineering Executive Summary On July 21, 2023 a stimulation treatment was performed in the A-Sand formation on the CD4-597 well in Harrison Bay County, AK. The CD4-597 was a 7 stage Horizontal Sleeve Design. The proposed treatment consisted of: The actual treatment fully completed 6 of 7 stages. 0 stages were skipped, 0 stage screened out and 1 stages were cut short of design. The actual treatment consisted of: A more detailed description of the actual treatment can be found in the attached reports. The following comments were provided to summarize events and changes to the proposed treatment: Breaker schedules where adjusted from planned designs based on lab testing performed in the field and in Deadhorse. Planned pumping schedules were adjusted from initial designs by customer. Interval 4 was cut short from design due to all pumps starting to cavitate during the 3ppg proppant stage. Rate could not be regained and the decision was made to flush the well and clean out pumps. After cleaning out pumps Interval 5 was pumped without any complications. Halliburton is strongly committed to quality control on location. Before and after each job all chemicals, proppants, and fluid volumes are measured to assure the highest level of quality control. Tank fluid analysis, crosslink time, and break tests are performed before each job in order to optimize the performance of the treatment fluids. In interval 7, all remaining 100M was placed into the hopper from the castle leaving 0 behind in the castle. Estimating approximatly 38000lbs of 20/40 was left in the castle. This was proppant that was leftover from the stage cut short and design adjustments. Conoco Phillips - CD4-597 Executive Summary 3 Conoco Phillips A-SandCD4-59750-103-20839*Exceeds 80% of burst pressure*Description OD (in) ID (in) Wt (#) GradeFUF (gal/ft)MD Top (ft)MD Btm (ft) Volume (gal)Tubular Burst Pressure (psi)Tubing4.5 3.958 12.6 L-80 0.6392 0 11,417 7,298 8,430Tubing4.5 3.958 12.6 L-80 0.6392 11,417 18,340 4,425 8,430Total18,34011,723ft1.05ft105.8ftft1.05ft105.8ftTop MD (ft)Btm MD (ft)Average TVD (ft)Interval #Formation DescriptorAverage Interval Temperature (F)Ball Drop Time (HH:MM)Ball Hit Time (HH:MM)JSV Drop (bbl)JSV Slow Down (bbl)JSV Hit (bbl)Early (bbl)Surface Seat Pressure (psi)Surface Peak Pressure (psi)Surface Differential (psi)BH Seat Pressure (psi)BH Peak Pressure (psi)BH Differential (psi)Rate at Shift (bpm)Toe18,234 18,236 4,3561Narwhal105.7NA NA NA NA NA NA NA NA NA NA NA NA NA17,838 17,840 4,3572Narwhal105.84:48:00 PM 5:00:00 PM 2,944 3,165 3,20213.51,304 4,162 2,858 2,710 5,627 2,917 10.217,470 17,472 4,3363Narwhal105.56:26:00 PM 6:39:00 PM 5,224 5,440 5,4818.91,258 3,969 2,711 2,659 5,363 2,704 10.116,800 16,802 4,2784Narwhal104.91:25:00 PM 1:43:00 PM 30 236 2814.7808 3,552 2,744 2,244 5,323 3,079 10.216,433 16,435 4,2765Narwhal104.96:00:00 PM 6:19:00 PM 2,493 2,693 2,7367.11,428 4,395 2,967 2,340 5,342 3,002 10.616,027 16,029 4,2736Narwhal104.99:48:00 AM 10:08:00 AM 0 194 2377.21,905 4,854 2,949 2,317 5,117 2,800 10.3Heel15,616 15,618 4,2677Narwhal104.811:15:00 AM 11:27:00 AM 1,778 1,966 2,0141.72,635 4,982 2,347 2,972 5,767 2,795 10.3237.79,98211,167 265.910,73910,50410,244Displacement to Top Sleeve/Perf (gal)(BBLS)11,655 277.511,402 271.5255.7250.1243.9Interval #1Max Pressure (psi)9,000Isolation TypeSwell PackerTreatment TubularsCustomerFormationLeaseAPIDateTemperature DataTemp. Gradient (°F/100 ft)BHST (°F)Directional Data4,3062,23718,340Directional Data2,2377/21/2023KOPTemperature DataSleeve/Perf Depth Sleeves723456Temp. Gradient (°F/100 ft)BHST (°F)TVD at Bottom PerfMD at Bottom Perf4,35718,236KOPAvg. TVDTotal MDConoco Phillips - CD4-597 Wellbore Information 4 CUSTOMERConoco Phillips APIBFD (lb/gal)8.54LAT 70.29217042LEASECD4-597SALES ORDEBHST (°F)106LONG-150.98903FORMATIONA-SandDATE Max Pressure (psi)9000*Exceeds 80% of burst pressure*Prop Slurry Design Clean Actual Clean Actual Clean Calculated Slurry Design Prop Calculated Prop BC-140X2 Losurf-300D MO-67 WG-36 OPTIFLO-HTE BE-6Treatment Stage Fluid Stage Proppant Conc Rate Volume Volume Volume Volume Total TotalCrosslinker Surfactant BufferInterval Number Description Description Description(ppg) (bpm) (gal) (gal) (bbl) (bbl) (lbs) (lbs)(gpt) (gpt) (gpt) (ppt) (ppt) (ppt)1-1 Shut-In Shut-In-1-2 Seawater Prime Up Pressure Test 5.0 1,000 588 14 140.151-3 Shut-In Shut-In-1-4 30# Linear DFIT 10.0 1,680 1,736 41 41 1.00 30.00 1.00 0.151-5 Shut-In Shut-In-1.001-6 30# Linear Step Rate Test 15.0 4,200 2,359 56 56 1.00 30.00 0.151-7 30# Delta Establish Stable Fluid 15.0 8,000 4,926 117 117 0.50 1.00 0.15 30.00 1.00 0.151-8 30# Delta Minifrac 25.0 12,600 13,175 314 314 0.50 1.00 0.15 30.00 1.00 0.151-9 30# Linear Flush 25.0 12,495 12,557 299 299 1.00 30.00 1.00 0.151-10 Shut-In Shut-In-1-11 30# Delta Establish Stable Fluid 25.0 8,000 6,859 163 163 0.50 1.00 0.15 30.00 1.00 0.151-12 30# Delta Pad 25.0 15,000 14,965 356 356 0.50 1.00 0.15 30.00 1.00 0.151-13 30# Delta Proppant Laden Fluid 100M 0.50 25.0 10,000 9,515 227 231 5,000 4,141 0.50 1.00 0.15 30.00 1.00 0.151-14 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 1.00 25.0 14,000 13,979 333 349 14,000 15,077 0.50 1.00 0.15 30.00 1.00 0.151-15 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 2.00 25.0 14,000 13,950 332 364 28,000 29,848 0.50 1.00 0.15 30.00 1.00 0.151-16 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 3.00 25.0 8,000 7,971 190 217 24,000 25,597 0.50 1.00 0.15 30.00 1.00 0.151-17 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 4.00 25.0 5,000 4,968 118 141 20,000 21,264 0.50 1.00 0.15 30.00 1.00 0.151-18 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 5.00 25.0 4,000 3,956 94 115 20,000 19,827 0.50 1.00 0.15 30.00 1.00 0.151-19 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 6.00 25.0 4,000 4,934 117 143 24,000 24,352 0.50 1.00 0.15 30.00 1.00 0.151-20 30# Delta Spacer and Ball Drop 25.0 1,200 1,480 35 35 0.50 1.00 0.15 30.00 1.00 0.152-1 30# Linear Displace Ball to Seat 25.0 11,402 11,641 277 277 1.00 30.00 1.00 0.152-2 30# Delta Establish Stable Fluid 15.0 8,400 5,272 126 126 0.50 1.00 0.15 30.00 1.00 0.152-3 30# Delta Pad 25.0 12,894 12,871 306 306 0.50 1.00 0.15 30.00 1.00 0.152-4 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 0.25 25.0 10,000 9,956 237 239 2,500 1,870 0.50 1.00 0.15 30.00 1.00 0.152-5 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 1.00 25.0 14,000 13,974 333 347 14,000 13,798 0.50 1.00 0.15 30.00 1.00 0.152-6 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 2.00 25.0 14,000 13,974 333 363 28,000 28,328 0.50 1.00 0.15 30.00 1.00 0.152-7 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 3.00 25.0 8,000 7,946 189 215 24,000 24,424 0.50 1.00 0.15 30.00 1.00 0.152-8 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 4.00 25.0 5,000 4,965 118 139 20,000 19,809 0.50 1.00 0.15 30.00 1.00 0.152-9 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 5.00 25.0 4,000 3,968 94 115 20,000 18,870 0.50 1.00 0.15 30.00 1.00 0.152-10 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 6.00 25.0 4,000 4,452 106 128 24,000 20,517 0.50 1.00 0.15 30.00 2.00 0.152-11 30# Delta Spacer and Ball Drop 25.0 1,200 1,030 25 25 0.50 1.00 0.15 30.00 1.00 0.153-1 30# Linear Displace Ball to Seat 25.0 11,167 11,411 272 272 1.00 30.00 1.00 0.153-2 30# Delta Establish Stable Fluid 15.0 8,400 5,189 124 124 0.50 1.00 0.15 30.00 1.00 0.153-3 30# Delta Pad 25.0 10,800 10,786 257 257 0.50 1.00 0.15 30.00 1.00 0.153-4 30# Delta Proppant Laden Fluid 100M 0.50 25.0 10,000 9,414 224 228 5,000 3,349 0.50 1.00 0.15 30.00 1.00 0.153-5 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 1.00 25.0 8,000 7,965 190 197 8,000 6,947 0.50 1.00 0.15 30.00 1.00 0.153-6 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 2.00 25.0 8,000 7,961 190 205 16,000 14,288 0.50 1.00 0.15 30.00 1.00 0.153-7 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 3.00 25.0 10,000 9,977 238 266 30,000 26,902 0.50 1.00 0.15 30.00 1.00 0.153-8 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 4.00 25.0 6,000 5,970 142 166 24,000 22,573 0.50 1.00 0.15 30.00 2.00 0.153-9 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 5.00 25.0 5,000 4,960 118 145 25,000 25,432 0.50 1.00 0.15 30.00 2.00 0.153-10 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 6.00 25.0 4,500 5,890 140 171 27,000 29,126 0.50 1.00 0.15 30.00 2.00 0.153-11 30# Linear Flush 25.0 11,587 11,613 277 277 1.00 30.00 1.00 0.153-12 Shut-In Shut-In-4-1 Shut-In Shut-In-4-2 Seawater Prime Up Pressure Test 5.0 1,000 1,234 29 290.154-3 Shut-In Shut-In-4-4 30# Linear Spacer and Ball Drop 15.0 1,200 1,291 31 31 1.00 30.00 1.50 0.154-5 30# Linear Displacement 15.0 10,739 10,813 257 257 1.00 30.00 1.50 0.154-6 30# Linear DFIT 10.0 1,680 1,691 40 40 1.00 30.00 1.50 0.154-7 Shut-In Shut-In-4-8 30# Delta Establish Stable Fluid 25.0 8,000 8,936 213 213 0.50 1.00 0.15 30.00 1.50 0.154-9 30# Delta Minifrac 25.0 8,820 8,808 210 210 0.50 1.00 0.15 30.00 1.50 0.154-10 30# Linear Flush 25.0 10,739 10,821 258 258 1.00 30.00 1.50 0.154-11 Shut-In Shut-In-4-12 30# Delta Establish Stable Fluid 15.0 8,000 6,290 150 150 0.50 1.00 0.15 30.00 1.50 0.154-13 30# Delta Pad 25.0 10,800 9,930 236 236 0.50 1.00 0.15 30.00 1.50 0.154-14 30# Delta Proppant Laden Fluid 100M 0.50 25.0 10,000 9,332 222 227 5,000 4,710 0.50 1.00 0.15 30.00 1.50 0.154-15 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 1.00 25.0 5,000 4,971 118 123 5,000 4,536 0.50 1.00 0.15 30.00 1.50 0.154-16 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 2.00 25.0 5,000 4,973 118 129 10,000 9,615 0.50 1.00 0.15 30.00 1.50 0.154-17 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 3.00 25.0 8,000 13,680 326 359 24,000 31,132 0.50 1.00 0.15 30.00 1.50 0.154-18 30# Linear Flush 25.0 10,739 10,895 259 259 1.00 30.00 2.00 0.1550-103-208390908735894Liquid Additives Dry AdditivesInterval 1Narwhal@ 18234 - 18236.36 ft 105.7 °FInterval 2Narwhal@ 17838 - 17840.36 ft 105.8 °FInterval 3Narwhal@ 17470 - 17472.36 ft 105.5 °FInterval 4Narwhal@ 16800 - 16802.36 ft 104.9 °FConoco Phillips - CD4-597 Actual Design 5 CUSTOMERConoco Phillips APIBFD (lb/gal)8.54LAT 70.29217042LEASECD4-597SALES ORDEBHST (°F)106LONG-150.98903FORMATIONA-SandDATE Max Pressure (psi)9000*Exceeds 80% of burst pressure*Prop Slurry Design Clean Actual Clean Actual Clean Calculated Slurry Design Prop Calculated Prop BC-140X2 Losurf-300D MO-67 WG-36 OPTIFLO-HTE BE-6Treatment Stage Fluid Stage Proppant Conc Rate Volume Volume Volume Volume Total TotalCrosslinker Surfactant BufferInterval Number Description Description Description(ppg) (bpm) (gal) (gal) (bbl) (bbl) (lbs) (lbs)(gpt) (gpt) (gpt) (ppt) (ppt) (ppt)50-103-208390908735894Liquid Additives Dry Additives5-1 Shut-In Shut-In-5-2 Seawater Prime Up Pressure Test 5.0 1,000 674 16 160.155-3 Shut-In Shut-In-5-4 30# Linear Spacer and Ball Drop 15.0 1,200 - 1.00 30.00 1.50 0.155-5 30# Delta Establish Stable Fluid 25.0 8,000 12,457 297 297 0.50 1.00 0.15 30.00 1.50 0.155-6 30# Delta Pad 25.0 10,739 10,726 255 255 0.50 1.00 0.15 30.00 1.50 0.155-7 30# Delta Proppant Laden Fluid 100M 0.50 25.0 10,000 10,952 261 267 5,000 5,520 0.50 1.00 0.15 30.00 1.50 0.155-8 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 1.00 25.0 5,000 4,969 118 123 5,000 4,710 0.50 1.00 0.15 30.00 1.50 0.155-9 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 2.00 25.0 5,000 4,960 118 129 10,000 10,200 0.50 1.00 0.15 30.00 1.50 0.155-10 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 3.00 25.0 6,500 6,467 154 176 19,500 20,656 0.50 1.00 0.15 30.00 1.50 0.155-11 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 4.00 25.0 6,000 5,943 142 168 24,000 25,000 0.50 1.00 0.15 30.00 1.50 0.155-12 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 5.00 25.0 5,500 5,452 130 160 27,500 28,198 0.50 1.00 0.15 30.00 2.00 0.155-13 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 6.00 25.0 5,000 4,949 118 150 30,000 30,617 0.50 1.00 0.15 30.00 2.00 0.155-14 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 7.00 25.0 2,000 3,869 92 111 14,000 17,856 0.50 1.00 0.15 30.00 2.00 0.155-15 30# Linear Flush 25.0 10,504 10,856 258 258 1.00 30.00 1.50 0.155-16 Shut-In Shut-In-6-1 Shut-In Shut-In-6-2 Seawater Prime Up Pressure Test 5.0 1,000 460 11 110.156-3 Shut-In Shut-In-6-4 30# Linear Spacer and Ball Drop 15.0 1,200 585 14 14 1.00 30.00 1.50 0.156-5 30# Delta Establish Stable Fluid 15.0 8,000 4,211 100 100 0.50 1.00 0.15 30.00 1.50 0.156-6 30# Delta Pad 15.0 9,450 9,605 229 229 0.50 1.00 0.15 30.00 1.50 0.156-7 30# Delta Proppant Laden Fluid 100M 0.50 25.0 10,000 15,339 365 374 5,000 8,394 0.50 1.00 0.15 30.00 1.50 0.156-8 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 1.00 25.0 5,000 4,960 118 123 5,000 4,763 0.50 1.00 0.15 30.00 1.50 0.156-9 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 2.00 25.0 5,000 4,975 118 129 10,000 9,580 0.50 1.00 0.15 30.00 1.50 0.156-10 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 3.00 25.0 6,500 6,466 154 174 19,500 19,078 0.50 1.00 0.15 30.00 1.50 0.156-11 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 4.00 25.0 6,000 5,956 142 168 24,000 24,363 0.50 1.00 0.15 30.00 2.00 0.156-12 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 5.00 25.0 5,500 5,956 142 171 27,500 27,529 0.50 1.00 0.15 30.00 2.00 0.156-13 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 6.00 25.0 5,000 5,956 142 174 30,000 30,054 0.50 1.00 0.15 30.00 2.00 0.156-14 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 7.00 25.0 4,100 4,501 107 128 28,700 19,261 0.50 1.00 0.15 30.00 2.00 0.156-15 30# Delta Spacer and Ball Drop 25.0 1,200 1,403 33 33 0.50 1.00 0.15 30.00 1.50 0.157-1 30# Delta Pad 25.0 9,700 11,520 274 274 0.50 1.00 0.15 30.00 2.00 0.157-2 30# Delta Proppant Laden Fluid 100M 0.50 25.0 10,000 6,206 148 150 5,000 1,870 0.50 1.00 0.15 30.00 1.50 0.157-3 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 1.00 25.0 5,000 4,985 119 124 5,000 4,676 0.50 1.00 0.15 30.00 1.50 0.157-4 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 2.00 25.0 5,000 4,963 118 128 10,000 9,005 0.50 1.00 0.15 30.00 1.50 0.157-5 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 3.00 25.0 6,500 6,472 154 173 19,500 17,709 0.50 1.00 0.15 30.00 1.50 0.157-6 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 4.00 25.0 6,000 5,953 142 166 24,000 22,916 0.50 1.00 0.15 30.00 1.50 0.157-7 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 5.00 25.0 5,500 5,461 130 159 27,500 27,587 0.50 1.00 0.15 30.00 2.00 0.157-8 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 6.00 25.0 5,000 5,461 130 162 30,000 30,299 0.50 1.00 0.15 30.00 2.00 0.157-9 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 7.00 25.0 4,100 4,067 97 127 28,700 28,211 0.50 1.00 0.15 30.00 2.00 0.157-10 30# Delta Proppant Laden Fluid Wanli 20/40 Ceramic 8.00 25.0 2,100 4,737 113 141 16,800 26,404 0.50 1.00 0.15 30.00 2.00 0.157-11 30# Linear Flush 25.0 9,982 10,075 240 240 1.00 30.00 2.00 0.157-12 Shut-In Shut-In-623,016 625,315 14,888 15,846 897,700 900,788Design Total (gal)Actual Total (gal)Design Total (lbs)Calculated Total (lbs)Ticket Total (lbs)BC-140X2 Losurf-300D MO-67 WG-36 OPTIFLO-HTE BE-6527,953 514,015 956,200 872,804 872,804(gal) (gal) (gal) (lbs) (lbs) (lbs)99,774 108,344 35,000 27,984 36,000 Initial Design Material Volume 264.0 627.7 79.2 18,831.8 841.8 94.2-2,956 - - - Actual Design Material Volume 257.0 622.4 77.1 18,670.8 847.6 93.8-6,100 - - - Physical Material Volume Pumped 250 625 80 18140 840 94.34-- - - - - Physical Material Volume Deviance -3% 0% 4% -3% -1% 1%-- -** IFS numbers for proppant are taken from software calculations based on multiple variablesMicroMotion Volume Pumped 253 608 76 18,877 831 --- -** Proppant is billed from Weight Ticket volumesMicroMotion Volume Deviance -2% -2% -2% 1% -2% - -- --Fluid Type30# Delta30# LinearSeawaterFreeze Protect-Proppant TypeWanli 20/40 Ceramic100M-----Interval 6Narwhal@ 16027 - 16029.36 ft 104.9 °FInterval 7Narwhal@ 15616 - 15618.36 ft 104.8 °FInterval 5Narwhal@ 16433 - 16435.36 ft 104.9 °FConoco Phillips - CD4-597 Actual Design 6 7/21/23 12:58 7/21/23 17:00 242 min NA bpm NA psi NA psi NA bbl 25.2 bpm 3,521 psi 3,564 psi 24.0 bpm 2,933 psi 2,988 psi 3,300 psi 1,727 hhp 167 psi 308 psi 743 psi 6.37 ppg 5 5 23 cP 83.8 F 8.7 Minifrac 16.560 bpm 2046 psi 2862 psi 25.17 bpm 3367 psi 3598 psi 135,965 lbs 4,141 lbs 140,106 lbs 140,106 lbs 100,678 gal 2,397 bbls 16,652 gal 396 bbls 588 gal 14 bbls Wanli 20/40 Ceramic Pumped: Proppant Summary Total Proppant Pumped* : Fluid Summary (by fluid description) Average Visc: Average Temp: Initial Rate (Breakdown): Initial Surface Pressure (Breakdown): Max Rate: Max Surface Pressure: Max BH Pressure: Interval Summary CD4-597 - Narwhal - Interval 1 Interval Summary Start Date/Time: End Date/Time: Average Missile Pressure: Open Well Pressure: Initial OA Pressure: Average Surface Pressure: Average Rate: Max OA Pressure: Minifrac Max Surface Pressure: 100M Pumped: Proppant in Formation: 30# Delta Volume: 30# Linear Volume: Seawater Volume: Minifrac Max DH Pressure: Dart/Ball Early : Average pH: Minifrac Average Rate: Diagnostic method Pump Time: Initial BH Pressure (Breakdown): Average BH Pressure: Pumps Ending Stage: Max Proppant Concentration: Minifrac Average Pressure: Minifrac Average DH Pressure: Minifrac Max Rate: Pumps Starting Stage: Average Missile HHP: Conoco Phillips - CD4-597 Interval Summary 7 14,965 gal 356 bbls 59,273 gal 1,411 bbls 1,480 gal 35 bbls 12,557 gal 299 bbls 2,359 gal 56 bbls 11,785 gal 281 bbls 13,175 gal 314 bbls 1,736 gal 41 bbls Completed Comments: Engineer: Treater: Supervisor: Customer Engineer: Customer Rep: Wellhead opened at 12:58 7-21. DFIT was pumped from 12:59 to 13:04 for a total of 41bbl. Max rate was 10.57bpm and average was 8.47bpm. Gel viscosity varried during the start of the stage. After making adjustments held gel loading constant the remainder of the stage. Interval pumped to design. *Values for proppant are taken from software calculations based on multiple variables. Proppant is billed off of weight ticket volumes and may vary slightly from this number. DFIT Volume: Proppant Laden Fluid Volume: Spacer and Ball Drop Volume: Interval Status: Zach Thomas Abdon Gamez Kyle Metzgar Chad Burkett Keegan Lambe Minifrac Volume: Fluid Summary (by stage description) Flush Volume: Step Rate Test Volume: Establish Stable Fluid Volume: Pad Volume: Conoco Phillips - CD4-597 Interval Summary 8 7/21/23 17:00 7/21/23 18:39 99 min 10.2 bpm 4,162 psi 5,627 psi 13 bbl 25.2 bpm 3,486 psi 3,460 psi 23.3 bpm 2,706 psi 2,751 psi 3,107 psi 1,542 hhp NA psi 743 psi 750 psi 6.26 ppg 5 5 23 cP 85.9 F 8.7 127,616 lbs 0 lbs 127,616 lbs 127,616 lbs 78,408 gal 1,867 bbls 11,641 gal 277 bbls 11,641 gal 277 bbls 12,871 gal 306 bbls 59,235 gal 1,410 bbls 1,030 gal 25 bbls 5,272 gal 126 bbls Completed Comments: Engineer: Treater: Supervisor: Customer Engineer: Customer Rep: Interval Status: Proppant was left in hopper prior to starting stage. Pumped 20/40 instead of 100M at 0.25ppg. Started wet proppant in 5.00ppg proppant. Interval pumped to design. *Values for proppant are taken from software calculations based on multiple variables. Proppant is billed off of weight ticket volumes and may vary slightly from this number.Chad Burkett Keegan Lambe Zach Thomas Abdon Gamez Kyle Metzgar Wanli 20/40 Ceramic Pumped: 100M Pumped: Total Proppant Pumped* : 30# Delta Volume: 30# Linear Volume: Pad Volume: Proppant Laden Fluid Volume: Spacer and Ball Drop Volume: Establish Stable Fluid Volume: Average Visc: Average Temp: Average pH: Max Proppant Concentration: Pumps Starting Stage: Interval Summary Start Date/Time: End Date/Time: Pump Time: Initial Rate (Breakdown): Initial Surface Pressure (Breakdown): Initial BH Pressure (Breakdown): Dart/Ball Early : Max Rate: Max Surface Pressure: Max BH Pressure: Average Rate: Average Missile Pressure: Average Surface Pressure: CD4-597 - Narwhal - Interval 2 Average BH Pressure: Average Missile HHP: Open Well Pressure: Initial OA Pressure: Max OA Pressure: Pumps Ending Stage: Proppant Summary Proppant in Formation: Fluid Summary (by fluid description) Fluid Summary (by stage description) Displace Ball to Seat Volume: Conoco Phillips - CD4-597 Interval Summary 9 7/21/23 18:39 7/21/23 20:06 87 min 10.1 bpm 3,969 psi 5,363 psi 9 bbl 25.2 bpm 3,081 psi 3,301 psi 23.7 bpm 2,620 psi 2,666 psi 3,107 psi 1,521 hhp NA psi 755 psi 779 psi 6.49 ppg 5 5 23 cP 85.8 F 8.7 2419 psi 0.558 psi/ft 2346 psi 2319 psi 2300 psi 125,268 lbs 3,349 lbs 128,617 lbs 128,617 lbs 68,112 gal 1,622 bbls 23,024 gal 548 bbls 11,411 gal 272 bbls 10,786 gal 257 bbls 52,137 gal 1,241 bbls 11,613 gal 277 bbls 5,189 gal 124 bbls Completed Fluid Summary (by stage description) Displace Ball to Seat Volume: Pad Volume: ISDP: Final Fracture Gradient: 30# Delta Volume: Interval Status: CD4-597 - Narwhal - Interval 3 End Date/Time: Max BH Pressure: Average Rate: Initial BH Pressure (Breakdown): Dart/Ball Early : Max Rate: Max Surface Pressure: Pump Time: Initial Rate (Breakdown): Initial Surface Pressure (Breakdown): Start Date/Time: Establish Stable Fluid Volume: Max OA Pressure: Wanli 20/40 Ceramic Pumped: Average Missile HHP: Average Temp: Average Missile Pressure: Average Surface Pressure: Average BH Pressure: Pumps Starting Stage: Pumps Ending Stage: Average pH: Final 5 min: 30# Linear Volume: 100M Pumped: Max Proppant Concentration: Open Well Pressure: Interval Summary Proppant Laden Fluid Volume: Initial OA Pressure: Flush Volume: Proppant Summary Total Proppant Pumped* : Proppant in Formation: Fluid Summary (by fluid description) Average Visc: Final 10 min: Final 15 min: Conoco Phillips - CD4-597 Interval Summary 10 Comments: Engineer: Treater: Supervisor: Customer Engineer: Customer Rep: 7/22/23 13:22 7/22/23 17:08 226 min 10.2 bpm 3,552 psi 5,323 psi 5 bbl 24.8 bpm 3,232 psi 3,286 psi 18.2 bpm 2,154 psi 2,167 psi 2,806 psi 960 hhp 206 psi 481 psi 713 psi 3.59 ppg 4 3 24 cP 86 F 8.5 Minifrac 16.240 bpm 1811 psi 2610 psi 24.78 bpm 3125 psi 3025 psi 2402 psi 0.561 psi/ft 2334 psi 2316 psi 2302 psi 45,283 lbs 4,710 lbs 49,993 lbs 49,993 lbs Proppant Summary Wanli 20/40 Ceramic Pumped: Total Proppant Pumped* : Average Surface Pressure: Pumps Starting Stage: Diagnostic method Final Fracture Gradient: Final 5 min: 100M Pumped: Minifrac Max DH Pressure: ISDP: Max OA Pressure: Max Proppant Concentration: Average Visc: Minifrac Average Rate: Minifrac Average DH Pressure: Average Rate: Average Missile Pressure: Average BH Pressure: Average Missile HHP: Pumps Ending Stage: Minifrac Max Surface Pressure: Final 10 min: Final 15 min: Max Surface Pressure: Initial BH Pressure (Breakdown): Pump Time: Open Well Pressure: Initial OA Pressure: Max BH Pressure: Minifrac Average Pressure: Initial Surface Pressure (Breakdown): Keegan Lambe Zach Thomas Abdon Gamez End Date/Time: Interval pumped to design. *Values for proppant are taken from software calculations based on multiple variables. Proppant is billed off of weight ticket volumes and may vary slightly from this number. Kyle Metzgar Chad Burkett CD4-597 - Narwhal - Interval 4 Interval Summary Start Date/Time: Dart/Ball Early : Max Rate: Average Temp: Average pH: Minifrac Max Rate: Initial Rate (Breakdown): Proppant in Formation: Conoco Phillips - CD4-597 Interval Summary 11 66,920 gal 1,593 bbls 35,511 gal 846 bbls 1,234 gal 29 bbls 9,930 gal 236 bbls 32,956 gal 785 bbls 10,813 gal 257 bbls 1,291 gal 31 bbls 21,716 gal 517 bbls 15,226 gal 363 bbls 8,808 gal 210 bbls 1,691 gal 40 bbls Cut Short Comments: Engineer: Treater: Supervisor: Customer Engineer: Customer Rep: Kyle Metzgar Chad Burkett Keegan Lambe Zach Thomas Fluid Summary (by fluid description) Seawater Volume: Fluid Summary (by stage description) Flush Volume: Interval Status: Adjusted designs from origonal pump schedule. DFIT and Minifrac were pumped in this interval. During 3ppg all pumps started to cavitate. Running wet proppant. Cut proppant to clear fluid and attempted to get rate back. Switched to linear to flush well while attempting to get rate back. Stage was called and the well was completely flushed. No tracer was dropped in Abdon Gamez Pad Volume: Minifrac Volume: DFIT Volume: *Values for proppant are taken from software calculations based on multiple variables. Proppant is billed off of weight ticket volumes and may vary slightly from this number. 30# Delta Volume: Establish Stable Fluid Volume: Proppant Laden Fluid Volume: Displacement Volume: Spacer and Ball Drop Volume: 30# Linear Volume: Conoco Phillips - CD4-597 Interval Summary 12 7/22/23 18:00 7/22/23 19:41 101 min 10.6 bpm 4,395 psi 5,342 psi 7 bbl 25.6 bpm 3,016 psi 3,223 psi 22.7 bpm 2,455 psi 2,437 psi 2,958 psi 1,366 hhp 490 psi 659 psi 722 psi 7.61 ppg 5 5 24 cP 89.1 F 8.7 2486 psi 0.581 psi/ft 2443 psi 2428 psi 2409 psi 137,237 lbs 5,520 lbs 142,757 lbs 142,757 lbs 70,744 gal 1,684 bbls 10,856 gal 258 bbls 674 gal 16 bbls 10,726 gal 255 bbls 47,561 gal 1,132 bbls 10,856 gal 258 bbls 12,457 gal 297 bbls Completed Interval Summary Final 10 min: Final 15 min: Proppant Summary Fluid Summary (by fluid description) Fluid Summary (by stage description) Wanli 20/40 Ceramic Pumped: Pad Volume: 30# Linear Volume: 100M Pumped: CD4-597 - Narwhal - Interval 5 Average BH Pressure: Initial OA Pressure: Max Proppant Concentration: Start Date/Time: Average Rate: Proppant in Formation: Seawater Volume: Final 5 min: Flush Volume: Dart/Ball Early : Average Missile HHP: Open Well Pressure: Average Visc: Max Surface Pressure: Pumps Starting Stage: Pumps Ending Stage: Final Fracture Gradient: ISDP: Interval Status: Establish Stable Fluid Volume: 30# Delta Volume: Pump Time: Average Missile Pressure: Max OA Pressure: Initial BH Pressure (Breakdown): Average pH: Initial Surface Pressure (Breakdown): Max Rate: Total Proppant Pumped* : Initial Rate (Breakdown): End Date/Time: Max BH Pressure: Average Surface Pressure: Average Temp: Proppant Laden Fluid Volume: Conoco Phillips - CD4-597 Interval Summary 13 Comments: Engineer: Treater: Supervisor: Customer Engineer: Customer Rep: Keegan Lambe Zach Thomas Abdon Gamez *Values for proppant are taken from software calculations based on multiple variables. Proppant is billed off of weight ticket volumes and may vary slightly from this number.Kyle Metzgar Chad Burkett Ball was dropped from hydraulic master. Establishing crosslink took significantly longer than anticipated. Interval pumped to design. Conoco Phillips - CD4-597 Interval Summary 14 7/23/23 9:48 7/23/23 11:27 99 min 10.3 bpm 4,854 psi 5,117 psi 7 bbl 24.9 bpm 4,859 psi 5,130 psi 20.7 bpm 2,571 psi 2,598 psi 3,042 psi 1,306 hhp 0 psi 436 psi 733 psi 7.55 ppg 5 5 24 cP 85.2 F 8.6 134,628 lbs 8,394 lbs 143,022 lbs 143,022 lbs 69,328 gal 1,651 bbls 585 gal 14 bbls 0 gal 0 bbls 9,605 gal 229 bbls 54,109 gal 1,288 bbls 1,988 gal 47 bbls 4,211 gal 100 bbls Completed Comments: Engineer: Treater: Supervisor: Customer Engineer: Customer Rep: Zach Thomas Abdon Gamez *Values for proppant are taken from software calculations based on multiple variables. Proppant is billed off of weight ticket volumes and may vary slightly from this number. Kyle Metzgar Chad Burkett CD4-597 - Narwhal - Interval 6 Interval Summary Average pH: Proppant Summary Fluid Summary (by fluid description) Fluid Summary (by stage description) Proppant Laden Fluid Volume: Pumps Starting Stage: Max Rate: Average Missile Pressure: Average Rate: Open Well Pressure: Interval Status: Ball was dropped from the Hydraulic Master. Held 100M stage long to fully clean hopper out of 100M. Pumped the wet proppant in 1-3ppg. Rocks were noticed on top of blender screens in 4ppg. 7ppg cut was earlier than anticipated. Interval pumped to design Keegan Lambe Establish Stable Fluid Volume: Max OA Pressure: Proppant in Formation: Wanli 20/40 Ceramic Pumped: Average BH Pressure: Freeze Protect Volume: End Date/Time: Max Surface Pressure: Max BH Pressure: Average Visc: Average Temp: Total Proppant Pumped* : Start Date/Time: Spacer and Ball Drop Volume: 100M Pumped: Pumps Ending Stage: Initial OA Pressure: Pump Time: Initial Surface Pressure (Breakdown): Initial BH Pressure (Breakdown): Dart/Ball Early : 30# Delta Volume: 30# Linear Volume: Max Proppant Concentration: Pad Volume: Average Surface Pressure: Initial Rate (Breakdown): Average Missile HHP: Conoco Phillips - CD4-597 Interval Summary 15 7/23/23 11:27 7/23/23 12:38 71 min 10.3 bpm 4,982 psi 5,767 psi 2 bbl 25.5 bpm 3,472 psi 3,150 psi 23.0 bpm 2,499 psi 2,524 psi 2,953 psi 1,406 hhp NA psi 723 psi 753 psi 8.68 ppg 5 5 23 cP 86.8 F 8.7 2534 psi 0.594 psi/ft 2505 psi 2453 psi 2424 psi 166,807 lbs 1,870 lbs 168,677 lbs 168,677 lbs 59,825 gal 1,424 bbls 10,075 gal 240 bbls 11,520 gal 274 bbls 48,305 gal 1,150 bbls 10,075 gal 240 bbls Completed CD4-597 - Narwhal - Interval 7 End Date/Time: Dart/Ball Early : ISDP: Average pH: Initial OA Pressure: Pumps Starting Stage: Max Proppant Concentration: Average Temp: Average Missile HHP: Average BH Pressure: Average Surface Pressure: Interval Summary Final Fracture Gradient: Interval Status: Fluid Summary (by fluid description) Final 5 min: Proppant Summary Max Rate: Initial BH Pressure (Breakdown): Start Date/Time: Open Well Pressure: Pumps Ending Stage: Final 10 min: Pad Volume: Proppant Laden Fluid Volume: Max OA Pressure: 30# Delta Volume: Max Surface Pressure: Max BH Pressure: Average Rate: Average Missile Pressure: Initial Rate (Breakdown): Initial Surface Pressure (Breakdown): Average Visc: Wanli 20/40 Ceramic Pumped: 100M Pumped: Final 15 min: 30# Linear Volume: Flush Volume: Total Proppant Pumped* : Proppant in Formation: Fluid Summary (by stage description) Pump Time: Conoco Phillips - CD4-597 Interval Summary 16 Comments: Engineer: Treater: Supervisor: Customer Engineer: Customer Rep:Chad Burkett 100M ran out early from castle. Ran wet proppant until castle was empty. Switched at end of 5ppg to the dry proppant. Pumps cavitated in 8ppg. Interval pumped to design. Kyle Metzgar Keegan Lambe Zach Thomas Abdon Gamez *Values for proppant are taken from software calculations based on multiple variables. Proppant is billed off of weight ticket volumes and may vary slightly from this number. Conoco Phillips - CD4-597 Interval Summary 17 CustomerFormationLeaseAPIDateWell SummaryWanli 20/40 Ceramic 100MTotal ProppantSurface Pressure Rate Visc Temp pH Surface Pressure Rate bbl gal bbl gal bbl gal bbl lbs lbs lbs12988 24.0 23 83.8 8.7 3521 25.2 2,397 16,652 396 588 14 117,918 2,808 135,965 4,141 140,106 22751 23.3 23 86 8.7 3486 25.2 1,867 11,641 277 90,049 2,144 127,616 127,616 32666 23.7 23 86 8.7 3081 25.2 1,622 23,024 548 91,136 2,170 125,268 3,349 128,617 42167 18.2 24 86 8.5 3232 24.8 1,593 35,511 846 1,234 29 103,665 2,468 45,283 4,710 49,993 52437 22.7 24 89 8.7 3016 25.6 1,684 10,856 258 674 16 82,274 1,959 137,237 5,520 142,757 62598 20.7 24 85 8.6 4859 24.9 1,651 585 14 460 11 70,373 1,676 134,628 8,394 143,022 72524 23.0 23 87 8.7 3472 25.5 1,424 10,075 240 69,900 1,664 166,807 1,870 168,677 Minimum1424 585 14 460 11 69900 1664 45283 1870 49993 Average1748 15478 369 739 18 89331 2127 124686 4664 128684 Maximum2397 35511 846 1234 29 117918 2808 166807 8394 168677 Wanli 20/40 Ceramic 100M Total ProppantPressure Rate Visc Temp pH Pressure Rate bbl gal bbl gal bbl gal bbl lbs lbs TotalPlanned12,570 99,774 2,376 0 0 633,827 15,091 867,700 30,000 991,200Recorded1511 13.0 14 50 5.05 4859 25.6 12,238 108,344 2,580 2,956 70 625,315 14,888 872,804 27,984 900,788Weight Tickets872,804 36,000 908,804** Proppant is billed from Weight Ticket volumes** IFS numbers for proppant are taken from software calculations based on Total FluidFluids ProppantsFluids ProppantsTotal FluidAverage MaxSeawater30# Delta 30# Linear30# Delta 30# LinearIntervalAverage MaxSeawaterJuly 21, 202350-103-20839CD4-597A-SandConoco Phillips Conoco Phillips - CD4-597 Fluid System-Proppant Summary 18 Hydraulic Fracturing Fluid Product Component Information Disclosure 2023-07-21 Alaska Harrison Bay 50-103-20839 CONOCOPHILLIPS l River Unit CD4-597 -150.9890 70.2921 NAD83 none Oil 4358 625315 Hydraulic Fracturing Fluid Composition: Trade Name Supplier Purpose Ingredients Chemical Abstract Service Number (CAS #) Maximum Ingredient Concentration in Additive (% by mass)** Maximum Ingredient Concentration in HF Fluid (% by mass)** Ingredient Mass lbs Comments Company First Name Last Name Email Phone SEAWATER (SG 8.52) Halliburton Base Fluid Water 7732-18-5 100.00%85.05225%5327684 Density = 8.52 Halliburton BC-140 X2 Halliburton Initiator Listed Below Listed Below 0 BE-6(TM) Bactericide Halliburton Microbiocide Listed Below Listed Below 0 LoSurf-300D Halliburton Non-ionic Surfactant Listed Below Listed Below 0 LVT-200 Baker Hughes Additive Listed Below Listed Below 0 NA MO-67 Halliburton pH Control Listed Below Listed Below 0 OPTIFLO-HTE Halliburton Breaker Listed Below Listed Below 0 NA SP BREAKER Halliburton Breaker Listed Below Listed Below 0 WG-36 GELLING AGENT Halliburton Gelling Agent Listed Below Listed Below 0 Ceramic Proppant - Wanli Wanli Proppant Listed Below Listed Below 0 NA Sand-Common White-100 Mesh, SSA-2 Halliburton Proppant Listed Below Listed Below 0 GPT 3000-3014 ResMetrics Tracer Listed Below Listed Below 0 NA OPT 2000-2050 ResMetrics Tracer Listed Below Listed Below 0 NA WPT 1000-1050 ResMetrics Tracer Listed Below Listed Below 0 NA Ingredients Listed Above Listed Above 1,2,4 Trimethylbenzene 95-63-6 1.00%0.00076%48 2,7-Naphthalenedisulfonic acid, 3- hydroxy-4-[(4-sulfor-1- naphthalenyl) azo] -, trisodium salt 915-67-3 0.10%0.00004%3 2-Bromo-2-nitro-1,3-propanediol 52-51-7 100.00%0.00150%94 C.I. Pigment Red 5 6410-41-9 1.00%0.00013%9 Confidential Proprietary 0.10%0.00000%1 ResMetrics Product Stewardship info@resmetr ics.com 8325921900 Confidential Proprietary 100.00%0.00240%151 ResMetrics Product Stewardship info@resmetr ics.com 8325921900 Corundum 1302-74-5 65.00%9.05686%567323 Crystalline silica, quartz 14808-60-7 100.00%0.57873%36252 Cured acrylic resin Proprietary 1.00%0.00013%9 Denise Tuck, Halliburton, 3000 N. Sam Houston Pkwy E., Houston, TX 77032, 281-871- 6226 Halliburton Denise Tuck Denise.Tuck @Halliburton. com 281-871-6226 Distillates (petroleum), hydrotreated light 64742-47-8 100.00%0.00000%0 Ethanol 64-17-5 60.00%0.04550%2850 Ethylene glycol 107-21-1 30.00%0.01216%762 Glycol Ether Proprietary 0.85%0.00001%1 ResMetrics Product Stewardship info@resmetr ics.com 8325921900 Guar gum 9000-30-0 100.00%0.28959%18140 Heavy aromatic petroleum naphtha 64742-94-5 30.00%0.02275%1425 Hemicellulase 9025-56-3 5.00%0.00067%42 Monoethanolamine borate 26038-87-9 100.00%0.04055%2540 Mullite 1302-93-8 45.00%6.27013%392762 Naphthalene 91-20-3 5.00%0.00379%238 Oxyalkylated nonyl phenolic resin Proprietary 30.00%0.02275%1425 Halliburton Denise Tuck Denise.Tuck @Halliburton. com 281-871-6226 Oxyalkylated phenolic resin Proprietary 10.00%0.00758%475 Halliburton Denise Tuck Denise.Tuck @Halliburton. com 281-871-6226 Poly(oxy-1,2-ethanediyl), alpha-(4- nonylphenyl)-omega-hydroxy-, branched 127087-87-0 5.00%0.00379%238 Polyamine Proprietary 30.00%0.00402%252 Halliburton Denise Tuck Denise.Tuck @Halliburton. com 281-871-6226 Propylene Glycol 57-55-6 0.20%0.00000%1 Sodium chloride 7647-14-5 5.00%4.25275%266393 Sodium hydroxide 1310-73-2 30.00%0.00406%255 Sodium persulfate 7775-27-1 100.00%0.00000%0 Sodium sulfate 7757-82-6 0.10%0.00000%0 Walnut hulls NA 100.00%0.01341%840 Halliburton Denise Tuck Denise.Tuck @Halliburton. com 281-871-6226 Water 7732-18-5 100.00%0.02570%1610 * Total Water Volume sources may include fresh water, produced water, and/or recycled water _ ** Information is based on the maximum potential for concentration and thus the total may be over 100% Note: For Field Development Products (products that begin with FDP), MSDS level only information has been provided.Version web 1.3 All component information listed was obtained from the supplier’s Material Safety Data Sheets (MSDS). As such, the Operator is not responsible for inaccurate and/or incomplete information. Any questions regarding the content of the MSDS should be directed to the supplier who provided it. The Occupational Safety and Health Administration’s (OSHA) regulations govern the criteria for the disclosure of this information. Please note that Federal Law protects "proprietary", "trade secret", and "confidential business information" and the criteria for how this information is reported on an MSDS is subject to 29 CFR 1910.1200(i) and Appendix D. Production Type: True Vertical Depth (TVD): Total Water Volume (gal)*: MSDS and Non-MSDS Ingredients are listed below the green line Well Name and Number: Longitude: Latitude: Long/Lat Projection: Indian/Federal: Fracture Date State: County: API Number: Operator Name: Page 1/1Procedure CloseoutCD4-597Primary Job TypeSUPPORT OTHER OPERATIONSStart Date7/14/2023End Date Final Job StatusIN PROGRESSTotal Time Log Hours (hr)189.20SummaryNetwork/Order Number Project Desc Estimator10450750Start Date ZX Code Time Log Hrs (hr)Cum Time Log (days) Last 24hr Sum7/14/2023 ZX02 Fracturing 12.50 0.52 SPOT TANK FARM7/15/2023 ZX02 Fracturing 12.00 1.02 CONTINUE SPOTTING TANK FARM7/16/2023 ZX02 Fracturing 12.00 1.52 PT DISCHERGE/ LOADING MANIFOLD7/17/2023 ZX02 Fracturing 17.99 2.27 CREW SWAP/ LOAING/HEATING WATER7/18/2023 ZX02 Fracturing 23.98 3.27 LOADING/HEATING WATERFRAC SHACK-> ON LOCATION7/19/2023 ZX02 Fracturing 23.99 4.27 COMPLETE LOADING/HEATING WATERSPOT CASTLES, LOAD CHEMSFRAC SHACK SPOT INLOAD PROPPANT, 1 CASTLE FULL, 2 CASTLES INOPRABLEFINISH SPOTTING EQUIPMENT7/20/2023 ZX02 Fracturing 23.98 5.27 HAL-> REPAIR CASTLES, COMPLETE RIG IN TO WELL, SPOT BALL DROP PUMP, NIPPLE UP GOAT HEADLYNDEN-> CONTINUE PROPPANT LOADING, PRELOADING @MT6, INSTALL RESTRAINTAES-> CRANE WORK TYING ON THE DART LAUNCH TREE AND ROTARY, COMPLETE IRON TIE IN TO LAUNCH PUMPAES-> COMPLETED SCAFFOLD RIG IN AROUND LAUNCH ROTARYGREAT NORTH-> SPOT EQUIPMENT NIPPLE UP LAUNCH TREE AND ROTARY, RIG UP ACCUMULATOR TO LAUNCH TREEFRAC SHACK-> COMPLETED EQUIPMENT TIE IN7/21/2023 ZX02 Fracturing 20.64 6.13 WELL OPENED AT 12:59, OPENING PRESSURE 105, PERFORMED DFIT, STEP RATE TEST AND MINIFRAC, AFTER 30 MIN. SHUTDOWN PUMPED 3 FRAC INTERVALS, INTERVAL ONE, TOTAL PROPPANT 4,141 LB. 100 MESH, 135,965 LB. 20/40, 2,807 BBL CLEAN VOLUMEINTERVAL TWO, TOTAL PROPPANT 127,616 LB. 20/40, 2,144 BBL CLEAN VOLUMEINTERVAL THREE TOTAL PROPPANT 3,349 LB 100 MESH, 125,268 LB 20/40, 2,170 BBL CLEAN VOLUME7/22/2023 ZX02 Fracturing 23.97 7.13 DROPPED BALL 3.003 MEASURED PUMP DFIT, STEP RATE MINIFRAC, COMPLETED INTERVAL 4 INTERVAL 4 BALL DISPLACEMENT 285.7 JSV ACTUAL 281 JSV GOOD SEAT INDICATION, PUMPED 4710LB 100 MESH, 45283 20/40,RUNNING WET PROPPANT MIX, DURING THE 3LB STAGE PUMPS STARTED CAVITATING, CUT PROPPANT TO CLEAR PUMPS, NO RATE RETURN, CALLED FLUSH, CALLED THE STAGE. TOTAL CLEAN VOLUME 2,493 BBLCOMPLETED INTERVAL 5, DROPPED BALL 3.065 MEASURED DISPLACEMENT 2737 JSV, ACTUAL 2730 GOOD BALL SEAT JSV SIGNIFICANT TIME FOR CROSSLINK ESTABLISHMENT; PUMPED 5510 LB 100 MESH, 137,237 LB 20/40 TOTAL CLEAN VOLUME 1942 BBL7/23/2023 ZX02 Fracturing 18.15 7.88 COMPLETED STAGES 6 AND 7 STAGE 6, DROPPED AND SEATED MEASURED 3.126 BALL, DISPLACEMENT VOLUME 244 BBL ACTUAL 237 BBL DIFFERENTIAL PSI 2949, PUMPED 8,394 LB 100 MESH, 143,022 LB 20/40 CLEAN VOLUME 1,671 BBL, MAX PROPPANT PPG 7.55 AVG RATE 20.7 BPMSTAGE 7 DROPPED AND SEATED MEASURED 3.1905 DISPLACEMENT VOLUME 237.6 BBL ACTUAL 235 BBL,TRIPPED PUMPS ON BREAK OVER, DIFFERENTIAL PSI 2800, PUMPED 1,870 LB 100 MESH, 166,807 20/40 TOTAL CLEAN 1,664 BBL MAX PROPPANT PPG 8.68, AVG RATE 23 BPM Page 11/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/7/2022 21:00 8/7/2022 22:00 1.00 SURFAC, DRILLOUT DRLG P DRILL CEMENT F/ 2,623.7' MD T/ 2,711.5' MD @ 600 GPM, 728 PSI, 57% F/O, 60 RPM, 3-10K TQ, 4-6 WOB 2,622.0 2,711.0 8/7/2022 22:00 8/8/2022 00:00 2.00 SURFAC, DRILLOUT DRLG P DRILL SHOE F/ 2,711.5' MD T/ 2,716' MD @ 500 GPM, 513 PSI, 50% F/O, 80 RPM, 3-10K TQ, 1-5 WOB 2,711.0 2,716.0 8/8/2022 00:00 8/8/2022 00:30 0.50 SURFAC, DRILLOUT COCF P DRILL RAT HOLE F/ 2,716' MD T/ 2,721' MD @ 500 GPM, 500 PSI, 58% F/O, 60 RPM, 3-10K TQ, 1-5 WOB 2,716.0 2,721.0 8/8/2022 00:30 8/8/2022 00:45 0.25 SURFAC, DRILLOUT COCF P WORKED THROUGH SHOE 3 TIMES @ 500 GPM, 500 PSI, 58% F/O, 40 RPM, 6-7K TQ. OBSERVED NO TORQUE OR OVERPULL 2,721.0 2,721.0 8/8/2022 00:45 8/8/2022 01:15 0.50 SURFAC, DRILLOUT DDRL P DRILL NEW HOLE F/ 2,721' MD T/ 2,741' MD @ 600 GPM, 700 PSI, 58% F/O, 80 RPM, 3-10K TQ, 10 WOB 2,721.0 2,741.0 8/8/2022 01:15 8/8/2022 02:00 0.75 SURFAC, DRILLOUT CIRC P ROT AND RECIP, CIRC B/U F/ 2,741' MD T/ 2,685' MD @ 600 GPM, 700 PSI, 55% F/O, 40 RPM, 6K TQ. TOTAL STKS= 3,374 (398 BBLS) 2,741.0 2,685.0 8/8/2022 02:00 8/8/2022 02:30 0.50 SURFAC, DRILLOUT FIT P @ 2,685' MD R/U FOR LOT/FIT 2,685.0 2,685.0 8/8/2022 02:30 8/8/2022 03:30 1.00 SURFAC, DRILLOUT FIT T PERFORM LOT/FIT W/ 10.3 PPG DRILLPLEX, PRESSURED UP T/ 524 PSI, ISOLATED WELL, AFTER 10 MIN PRESSURE BLED DOWN TO 220 PSI. PUMPED 2.6 BBLS, BLED 1 BBL BACK TO PITS LOT EQUAL OF 12.4 PPG 2,685.0 2,685.0 8/8/2022 03:30 8/8/2022 04:30 1.00 SURFAC, DRILLOUT FIT T PERFORM LOT/FIT W/ 10.3 PPG DRILLPLEX, PRESSURED UP T/ 568 PSI, ISOLATED WELL, AFTER 10 MIN PRESSURE BLED DOWN TO200 PSI. PUMPED 2.7 BBLS, BLED 1 BBL BACK TO PITS LOT EQUAL OF 12.4 PPG 2,685.0 2,685.0 8/8/2022 04:30 8/8/2022 05:30 1.00 SURFAC, DRILLOUT CIRC T PUMPS UP WELL DATA TO MWD, PJSM DISPLACE WELL WITH 11PPG LSND MUD. 2,685.0 2,685.0 8/8/2022 05:30 8/8/2022 06:30 1.00 SURFAC, DRILLOUT CIRC T DISPLACE WELL F/ 10.3 PPG DRILLPLEX T/ 11.0 PPG LSND. ROT AND RECIP F/ 2,713' MD T/ 2,685' MD @ 400 GPM, 244 PSI, 47% F/O, 20 RPM, 6K TQ, ROT P/U WT= 115K, ROT S/O WT= 120K TOTAL STKS PUMPED= 3487 (412 BBLS TO DISPLACE) 2,685.0 2,685.0 8/8/2022 06:30 8/8/2022 08:30 2.00 SURFAC, DRILLOUT CIRC T ROT / RECIP, F/ 2,710' MD T/ 2,685' MD, 20 RPM, 3-4K TQ, 400 GPM, 300 PSI, 48% FO, PU=115 2,685.0 2,685.0 8/8/2022 08:30 8/8/2022 10:00 1.50 SURFAC, DRILLOUT OWFF T OBTAIN SPR'S OWFF STATIC SPR’S @ 2,685’ MD, MW = 11.0 PPG TIME: 08:30 #1 MP – 30SPM – 83 PSI, 40SPM – 113 PSI #2 MP – 30SPM – 84 PSI, 40SPM – 114 PSI 2,685.0 2,685.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 12/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/8/2022 10:00 8/8/2022 10:30 0.50 SURFAC, DRILLOUT RURD T R/D AND BLOW DOWN TESTING EQUIP 2,685.0 2,685.0 8/8/2022 10:30 8/8/2022 12:00 1.50 SURFAC, DRILLOUT STRP T POOH ON ELEVATORS F/ 2685' TO 524' MD P/U 50K 2,685.0 524.0 8/8/2022 12:00 8/8/2022 12:30 0.50 SURFAC, DRILLOUT OWFF T OWFF @ 524' PRIOR TO L/D BHA (STATIC) 524.0 524.0 8/8/2022 12:30 8/8/2022 13:00 0.50 SURFAC, DRILLOUT TRIP T RACK BACK 1 STD DP AND HWDP IN DERRICK F/ 524' T/ 154' 524.0 154.0 8/8/2022 13:00 8/8/2022 16:00 3.00 SURFAC, DRILLOUT BHAH T L/D BHA PER SLB REP 154.0 0.0 8/8/2022 16:00 8/8/2022 17:00 1.00 SURFAC, DRILLOUT CLEN T CLEAN / CLEAR RIG FLOOR OF ALL BHA TOOLS AND EQUIPMENT 0.0 0.0 8/8/2022 17:00 8/8/2022 18:45 1.75 SURFAC, DRILLOUT WASH T M/U STACK WASHER, WASH STACK @ 900 GPM 0.0 0.0 8/8/2022 18:45 8/8/2022 19:45 1.00 SURFAC, DRILLOUT PULD T PULL WEAR RING AND SET TEST PLUG PER FMC REP 0.0 0.0 8/8/2022 19:45 8/8/2022 20:30 0.75 SURFAC, DRILLOUT RURD T R/U T/ TEST BOP 0.0 0.0 8/8/2022 20:30 8/8/2022 21:00 0.50 SURFAC, DRILLOUT BOPE T W/ 3 1/2" TEST JT, TEST ANNULAR AND UPPER PIPE RAMS (3 1/2" X 6" VBR'S TESAT ANNULAR 250 PSI AND 2500 PSI TEST RAMS 250 PSI AND 3500 PSI 0.0 0.0 8/8/2022 21:00 8/8/2022 21:30 0.50 SURFAC, DRILLOUT PULD T R/D TESTING EQUIPMENT 0.0 0.0 8/8/2022 21:30 8/8/2022 22:30 1.00 SURFAC, DRILLOUT PULD T PULL TEST PLUG, SET WEAR RING 0.0 0.0 8/8/2022 22:30 8/9/2022 00:00 1.50 SURFAC, DRILLOUT CLEN T CLEAN AND CLEAR RIG FLOOR, R/U TO RUN 3 1/2" TBG 0.0 0.0 8/9/2022 00:00 8/9/2022 00:30 0.50 SURFAC, DRILLOUT RURD T CONT. TO CLEAN RIG FLOOR AND CLEAR RIG FLOOR R/U TUBING TONGS TO RUN 3.5" TUBING 0.0 0.0 8/9/2022 00:30 8/9/2022 03:30 3.00 SURFAC, DRILLOUT PUTB T HOLD PJSM P/U AND RUN 3.5" 9+.3# L-80 HYD 563 TUBING AND X/O FROM SURFACE TO 521' MAKE UP CONNECTIONS TO 2900 FT/LBS S/O WT 50K 0.0 521.0 8/9/2022 03:30 8/9/2022 05:00 1.50 SURFAC, DRILLOUT TRIP T TIH OUT OF DERRICK W 5 7/8" DRILL PIPE F/ 521' TO 2687' 521.0 2,687.0 8/9/2022 05:00 8/9/2022 05:30 0.50 SURFAC, DRILLOUT WASH T WASH DOWN F/ 2,687' MD T/ 2,741' MD @ 4 BPM, 103 PSI, 33% F/O, 10 RPM, 2K TQ. TAG BOTTOM @ 2,741.89' MD W/ 3K WOB 2,687.0 2,741.0 8/9/2022 05:30 8/9/2022 12:00 6.50 SURFAC, DRILLOUT CIRC T ROT AND RECIP F/ 2,734' MD T/ 2,687' MD @ 4 BPM, 84 PSI, 33% F/O, 10 RPM, 2K TQ. WHILE WAITING ON CEMENT LABS, SIMOPS - TESTING MPD EQUIPMENT OFFLINE (CHARTED), CLEANING AND ORGANIZINING BOP DECK 2,741.0 2,741.0 8/9/2022 12:00 8/9/2022 14:30 2.50 SURFAC, DRILLOUT CIRC T CONT. T/ ROT AND RECIP F/ 2,734' MD T/ 2,687' MD @ 4 BPM, 72 PSI, 31% F/O, 10 RPM, 2K TQ. WHILE WAITING ON CEMENT LABS, SIMOPS-FINISH TESTING MPD EQUIPMENT OFFLINE (CHARTED), RIG UP PUP JTS,TIW'S, AND CROSSOVERS FOR CEMENT SWIVEL 2,741.0 2,734.0 8/9/2022 14:30 8/9/2022 15:00 0.50 SURFAC, DRILLOUT TRIP T POOH T/ 2,683, RACK BACK STD, P/U 5 7/8" SINGLE (31.57) 2,734.0 2,683.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 13/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/9/2022 15:00 8/9/2022 16:00 1.00 SURFAC, DRILLOUT CIRC T ROT AND RECIP F/ 2,712 MD' T/ 2,682 MD' @ 4BPM, 78 PSI, 32% F/O, 10 RPM, 2KTQ 2,712.0 2,712.0 8/9/2022 16:00 8/9/2022 17:00 1.00 SURFAC, DRILLOUT PULD T BLOW DOWN TOP DRIVE AND RIG UP CEMENT SWIVEL, RIH F/ 2,712' MD T/ 2,741' MD, S/O WT= 99K. BREAK CIRCULATION THROUGH CEMENT LINE @ 4 BPM, 108 PSI, 31% F/O, 10 RPM, 2K TQ 2,712.0 2,741.0 8/9/2022 17:00 8/9/2022 18:15 1.25 SURFAC, DRILLOUT CMNT T HOLD PJSM, CEMENTERS PUMP 25.7 BBLS 12.5 PPG MUDPUSH II, FOLLOWED BY 52.5 BBLS 15.6 PPG TAIL CEMENT, FOLLOWED BY 4.5 BBLS 12.5 MUDPUSH II. SWAP OVER TO RIG PUMP AND CHASE W/ 11.0 PPG LSND @ 6 BPM, 68 PSI, 31% F/O, 20 RPM, 2.4K TQ. @ 318 STKS AWAY SLOW PUMPS TO 3 BPM, 26 PSI, 30% F/O, 20 RPM, 2.4K TQ. PUMPS OFF @ 361 STKS AWAY 2,741.0 2,741.0 8/9/2022 18:15 8/9/2022 19:15 1.00 SURFAC, DRILLOUT RURD T L/D CEMENT SWIVEL, PUP, SINGLE AND POOH ON ELEVATORS RACKING BACK STDS F/ 2,741' MD T/ 2,214' MD PULLING @ 20 FT/MIN, P/U WT= 87K 2,741.0 2,214.0 8/9/2022 19:15 8/9/2022 20:00 0.75 SURFAC, DRILLOUT CIRC T @ 2,214' MD CIRC X2 B/U AND ROTATE @ 700 GPM, 327 PSI, 59% F/O, 10 RPM, 1K TQ. TOTAL STKS PUMPED= 5,254 (621 BBLS). PUMPED DOWN WIPER BALL 2,214.0 2,214.0 8/9/2022 20:00 8/9/2022 22:30 2.50 SURFAC, DRILLOUT SQEZ T PERFORM CEMENT SQUEEZE. SHUT IN UPPER PIPE RAMS, PRESSURE UP TO 200 PSI, AFTER 2 HOURS OBSERVE BLEED OFF TO 116 PSI. BLEED OFF ALL PRESSURE AND LEAVE WELL SHUT IN. PUMPED 11 STKS (1.3 BBLS), BLED 1 BBL BACK TO MUD PITS. 2,214.0 2,214.0 8/9/2022 22:30 8/10/2022 00:00 1.50 SURFAC, DRILLOUT CLEN T PERFORM GENERAL HOUSEKEEPING AROUND THE RIG, WORK ON MP2'S. CLEAN CEMENT VALVES ON MUD MANIFOLD, FLUSH OUT 1502 PIECES. 2,214.0 2,214.0 8/10/2022 00:00 8/10/2022 06:00 6.00 SURFAC, DRILLOUT WOC T WAITING CEMENT TO SET TO 100 PSI COMPRESSIVE STRENGTH. PERFORM GENERAL HOUSEKEEPING AROUND THE RIG, WORK ON MP2'S. CLEAN CEMENT VALVES ON MUD MANIFOLD, FLUSH OUT 1502 PIECES. 2,214.0 2,214.0 8/10/2022 06:00 8/10/2022 09:30 3.50 SURFAC, DRILLOUT WOC T WAITING ON CEMENT TO SET TO 100 PSI COMPRESSIVE STRENGTH. TEST MPD CHOKES. CONT TO WORK RIG PM'S, PREP FOR POOH. STAGE PITS FOR INTERMEDIATE 1 HOLE SECTION. 2,214.0 2,214.0 8/10/2022 09:30 8/10/2022 10:30 1.00 SURFAC, DRILLOUT CIRC T CIRC B/U WHILE R/B STAND F/ 2,214' MD T/ 2,116' MD W/ 700 GPM, 361 PSI, 61% F/O, P/U WT - 85K. TOTAL STKS PUMPED - 4,363. 2,214.0 2,214.0 8/10/2022 10:30 8/10/2022 11:00 0.50 SURFAC, DRILLOUT OWFF T B/D TD. OWFF F/ 15 MIN (STATIC) 2,214.0 2,214.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 14/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/10/2022 11:00 8/10/2022 12:00 1.00 SURFAC, DRILLOUT TRIP T POOH ON ELEVATORS F/ 2,114' MD T/ 521' MD. 2,214.0 521.0 8/10/2022 12:00 8/10/2022 13:00 1.00 SURFAC, DRILLOUT RURD T R/U CSG TONGS AND FLOOR SAFETY VALVE. 521.0 521.0 8/10/2022 13:00 8/10/2022 14:30 1.50 SURFAC, DRILLOUT TRIP T L/D 3½ CEMENT STRING F/ 521' MD. 521.0 0.0 8/10/2022 14:30 8/10/2022 16:00 1.50 SURFAC, DRILLOUT RURD T R/D DOYON CSG RUNNING TOOLS. SIMOPS - P/U INTERMEDIATE BHA VIA BEAVERSLIDE 0.0 0.0 8/10/2022 16:00 8/10/2022 19:00 3.00 SURFAC, DRILLOUT BHAH T PJSM, MAKEUP BHA #2 TO 442' MD 0.0 442.0 8/10/2022 19:00 8/10/2022 20:45 1.75 SURFAC, DRILLOUT TRIP T RIH F/ 442' MD T/ 2,232' MD. MONITOR DISPLACEMENT ON TT. P/U WT - 118K, S/O WT - 108K. 442.0 2,232.0 8/10/2022 20:45 8/10/2022 22:00 1.25 SURFAC, DRILLOUT WASH T WASH DOWN FROM 2,232' MD W/ 84 GPM, 74 PSI 28% F/O T/ TOP OF CEMENT @ 2,390' MD SETTING DN 7- 10K. 2,232.0 2,390.0 8/10/2022 22:00 8/10/2022 22:30 0.50 SURFAC, DRILLOUT REAM T WASH AND REAM DOWN F/ TOP OF CEMENT AT 2,390' MD T/ 2,417' MD W/ 606 GPM, 710 PSI, 58% F/O, 60 RPM, 5K TQ. ROT WT - 108K 2,390.0 2,417.0 8/10/2022 22:30 8/10/2022 23:15 0.75 SURFAC, DRILLOUT CIRC T ROTATE AND RECIPROCATE F/ 2,417' MD T/ 2,354' MD W/ 606 GPM, 730 PSI, 58% F/O, 20 RPM, 5K TQ. TOTAL STKS PUMPED - 5767 2,417.0 2,417.0 8/10/2022 23:15 8/11/2022 00:00 0.75 SURFAC, DRILLOUT PRTS T R/U AND TEST CSG TO 1125 PSI. 26 STKS TO PRESSURE UP (3 BBLS). 2 BBLS BLED BACK. 2,417.0 2,417.0 8/11/2022 00:00 8/11/2022 00:45 0.75 SURFAC, DRILLOUT PRTS T R/D AND B/D TESTING LINES 2,417.0 2,417.0 8/11/2022 00:45 8/11/2022 05:15 4.50 SURFAC, DRILLOUT DRLG T DRILL CEMENT F/ 2,417' MD T/ 2,718' MD W/ 600 GPM, 705 PSI, 60 RPM, 5.5K TQ, 58% F/O, UP WT - 118K, S/O WT - 108K, ROT WT - 117K 2,417.0 2,718.0 8/11/2022 05:15 8/11/2022 06:00 0.75 SURFAC, DRILLOUT CIRC T ROTATE AND RECIPROCATE F/ 2,718' MD T/ 2,672' MD W/ 600 GPM, 719 PSI, 40 RPM, 5-7K TQ, 58% F/O, UP WT - 118K, S/O WT - 108K, ROT WT - 117. TOTAL STKS PUMPED - 4054 2,718.0 2,718.0 8/11/2022 06:00 8/11/2022 07:30 1.50 SURFAC, DRILLOUT FIT T R/U AND FIT TO 13.1 EMW W/ 280 PSI. 5 STKS TO PRESSURE UP AND .7 BBLS BLED BACK. R/D LINES. 2,718.0 2,718.0 8/11/2022 07:30 8/11/2022 08:30 1.00 SURFAC, DRILLOUT DRLG T DRILL CEMENT F/ 2,718' MD T/ 2,741 W/ 600 GPM, 733 PSI, 55% F/O, 10K TQ, 7K WOB, UP WT - 118K, S/O WT - 114K, ROT WT - 113K 2,718.0 2,741.0 8/11/2022 08:30 8/11/2022 10:00 1.50 SURFAC, DRILLOUT CIRC T ROTATE AND RECIPROCATE F/ 2,741' MD T/ 2,609' MD W/ 600 GPM, 732 PSI, 55% F/O, 20 RPM, 6K TQ, TOTAL STKS PUMPED - 11,486 2,741.0 2,609.0 8/11/2022 10:00 8/11/2022 11:30 1.50 SURFAC, DRILLOUT LOT T R/U AND PERFORM LOT. 630 PSI ACHIEVED (15.9 EMW) W/ 1.3 BBLS PUMPED (11 STKS). A 20 MIN BLEED DN OBSERVED PSI FALL TO 85 PSI. BLEED REMAINING PSI OFF AND GAIN .6 BBLS IN TRIP TANK. R/D AND B/D TEST EQUIPMENT. 2,609.0 2,609.0 8/11/2022 11:30 8/11/2022 12:00 0.50 SURFAC, DRILLOUT CLEN T CLEAN AND PREP PITS FOR 300 BBLS DISPLACEMENT. 2,609.0 2,609.0 8/11/2022 12:00 8/11/2022 12:30 0.50 SURFAC, DRILLOUT CLEN T CONT CLEAN AND PREP PITS FOR 300 BBLS DISPLACEMENT. 2,609.0 2,609.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 15/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/11/2022 12:30 8/11/2022 13:30 1.00 SURFAC, DRILLOUT DISP T DISPLACE OUT 300 BBLS OF CEMENT CONTAMINATED MUD T/ 10.9 PPG LSND @ 370 GPM, 311 PSI, 45% F/O. TOTAL STKS PUMPED - 2623 2,609.0 2,609.0 8/11/2022 13:30 8/11/2022 18:00 4.50 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 2,741' MD T/ 3,137' MD – 2,587' TVD, 10K WOB 1000 GPM, 1720 PSI, 130 RPM, 6K TQ, 63% F/O, 11.70 ppg ECD,126K UP WT, 112K DN WT, 117K ROT WT. ADT = 3.36, TOTAL BIT HRS = 3.36 TOTAL JAR HRS = 29.12 2,741.0 3,137.0 8/11/2022 18:00 8/12/2022 00:00 6.00 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 3,137' MD T/ 3,735' MD – 2,800' TVD, 10K WOB 1000 GPM, 1800 PSI, 130 RPM, 8K TQ, 63% F/O, 11.75 ppg ECD, 128 UP WT, 110K DN WT, 115K ROT WT. ADT = 4.52, TOTAL BIT HRS = 7.88 TOTAL JAR HRS = 33.64 3,137.0 3,735.0 8/12/2022 00:00 8/12/2022 06:00 6.00 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 3,735' MD T/ 4,200' MD – 2,857' TVD, 12K WOB 1000 GPM, 1935 PSI, 130 RPM, 8K TQ, 63% F/O, 11.79 ppg ECD, 128 UP WT, 106K DN WT, 114K ROT WT. ADT =4.83 , TOTAL BIT HRS = 12.71 TOTAL JAR HRS = 38.47 3,735.0 4,200.0 8/12/2022 06:00 8/12/2022 12:00 6.00 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 4,200' MD T/ 4,486' MD – 2,895' TVD, 8K WOB 1000 GPM, 2057 PSI, 130 RPM, 8K TQ, 64% F/O, 11.87 ppg ECD, 132 UP WT, 105K DN WT, 115K ROT WT. ADT = 4.21 , TOTAL BIT HRS = 16.92 TOTAL JAR HRS = 42.68 4,200.0 4,886.0 8/12/2022 12:00 8/12/2022 18:00 6.00 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 4,486' MD T/ 4,707' MD – 2,924' TVD, 7K WOB 1000 GPM, 2122 PSI, 130 RPM, 8K TQ, 65% F/O, 11.91 ppg ECD, 136 UP WT, 106K DN WT, 107K ROT WT. ADT = 5.37, TOTAL BIT HRS = 22.29 TOTAL JAR HRS = 48.05 4,886.0 4,707.0 8/12/2022 18:00 8/13/2022 00:00 6.00 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 4,707' MD T/ 5,144' MD – 2,990' TVD, 12K WOB 1000 GPM, 2100 PSI, 130 RPM, 10K TQ, 64% F/O, 11.85 ppg ECD, 140 UP WT, 106K DN WT, 117K ROT WT. ADT = 5.22 , TOTAL BIT HRS = 27.51 TOTAL JAR HRS = 53.27 4,707.0 5,144.0 8/13/2022 00:00 8/13/2022 05:30 5.50 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 5,144' MD T/ 5,616' MD – 3,055' TVD, 10-12K WOB 1000 GPM, 2248 PSI, 130 RPM, 10K TQ, 64% F/O, 11.85 ppg ECD, 140 UP WT, 106K DN WT, 117K ROT WT. ADT - 4.39, BIT HRS - 31.9, JAR HOURS - 57.66 5,144.0 5,616.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 16/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/13/2022 05:30 8/13/2022 12:00 6.50 INTRM1, DRILL BKRM P OBTAIN SPR'S. BROOH F/ 5,616' MD T/ 4,675' MD @ 300 - 450' HR W/ 1000 GPM, 2200 PSI, 64% F/O, 120 RPM, 7K TQ, ECD - 11.65, UP WT WHILE AT FULL RATE - 110K. PUMP BIT BALLING SWEEPS EVERY OTHER STAND 5,616.0 4,675.0 8/13/2022 12:00 8/13/2022 18:00 6.00 INTRM1, DRILL BKRM P CONT TO BROOH F/ 4,675' MD T/ 3458' MD. @ 400 - 450' HR W/ 1000 GPM, 2000 PSI, 64% F/O, 120 RPM, 7K TQ, ECD - 11.65, UP WT WHILE AT FULL RATE - 110K. PUMP BIT BALLING SWEEPS EVERY OTHER STAND 3,900' MD - CAT2 VOLUME - 85% SMALL, LIGHT CLAY CUTTINGS LOAD, INCREASE QUANITIY OF 4-8" SIZE CHUNKS 3,670' MD CAT2 VOLUME - 85% SMALL, LIGHT CLAY CUTTINGS LOAD, OCCASIONAL OF 4-8" SIZE CHUNKS 4,675.0 3,458.0 8/13/2022 18:00 8/13/2022 21:30 3.50 INTRM1, DRILL BKRM P CONT TO BROOH F/ 3,458' MD T/ 2,698' MD. @ 300 - 500' HR W/ 1000 GPM, 1985 PSI, 64% F/O, 120 RPM, 7K TQ, ECD - 11.65, UP WT WHILE AT FULL RATE - 110K. PUMP BIT BALLING SWEEPS EVERY OTHER STAND OWFF WHILE AT THE SHOE (STATIC) SIMOPS - SERVICE THE TOP DRIVE AT THE SHOE. 2,862' MD CAT2 VOLUME - 85% SMALL, LIGHT CLAY CUTTINGS LOAD, INCREASE IN SIZE RATIO 3,458.0 2,698.0 8/13/2022 21:30 8/14/2022 00:00 2.50 INTRM1, DRILL BKRM P CONT TO BROOH F/ 2,698' MD T/ 1,945' MD. @ 600' HR W/ 1000 GPM, 1776 PSI, 64% F/O, 80 RPM, 4K TQ, ECD - 11.33, UP WT WHILE AT FULL RATE - 101K. CONTINUE TO PUMP BIT BALLING SWEEPS EVERY OTHER STAND 2,450' MD, CAT3 VOLUME - 60% SMALL, 20% LARGE, LIGHT CLAY CUTTINGS LOAD, LARGE INCREASE OF MATERIAL ON SWEEP RETURNS. 1,760' MD, CAT3 VOLUME - 40% SMALL, 40% LARGE, LIGHT CLAY CUTTINGS LOAD, LARGE INCREASE OF MATERIAL ON SWEEP RETURNS. 2,698.0 1,945.0 8/14/2022 00:00 8/14/2022 04:00 4.00 INTRM1, DRILL BKRM P CONT TO BROOH F/ 1,945' MD T/ 1,228' MD. @ 600' HR W/ 1000 GPM,1615 PSI, 64% F/O, 80 RPM, 4K TQ, ECD - 11.09 UP WT WHILE AT FULL RATE - 90K. CONTINUE TO PUMP BIT BALLING SWEEPS EVERY OTHER STAND 1,530' MD CAT2 VOLUME - 50% SMALL, 30% LARGE, DECREASING CLAY CUTTINGS LOAD 1,220' MD CAT2 VOLUME - 90% SMALL, MINIMAL CLAY CUTTINGS LOAD 1,945.0 1,228.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 17/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/14/2022 04:00 8/14/2022 07:30 3.50 INTRM1, DRILL TRIP P RIH ON ELEVATORS F/ 1,228' MD T/ 5,503' MD. MONITOR DISP VIA TT. FILL PIPE EVERY 20 STANDS. INCOUNTER OBSTRUCTION @ 5,504' MD. SETTING DOWN 15K. UNSUCCESSFUL ON PASSING BY OBSTRUCTION. 1,228.0 5,503.0 8/14/2022 07:30 8/14/2022 09:00 1.50 INTRM1, DRILL REAM P P/U TO 5,472' MD, KELLY UP AND SUCCESSFULLY REAM THROUGH OBSTRUCTION @ 5,503' MD DOWN T/ 5,516' MD W/ 700 GPM, 1282 PSI, 59% F/O, 80 RPM, 7K TQ, 140K UP WT, S/O WT - 104K, 117K ROT WT, 5,503.0 5,616.0 8/14/2022 09:00 8/14/2022 12:00 3.00 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 5,616' MD T/ 5,870' MD – 3,091' TVD, 7K WOB 1000 GPM, 2218 PSI, 150 RPM, 9K TQ, 64% F/O, 11.74 ppg ECD, 140 UP WT, 110K DN WT, 123K ROT WT. ADT - 2.46, BIT HRS - 34.36, JAR HOURS - 60.12. SIMOPS - DUMP/DILUTE 300 BBLS @ 5,653' MD. CONT WITH BIT BALLING SWEEPS. ADD CUP OF SAPP AT CONNECTIONS 5,616.0 5,870.0 8/14/2022 12:00 8/14/2022 18:00 6.00 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 5,870' MD T/ 6,389' MD – 3,182' TVD, 9K WOB 1000 GPM, 2320 PSI, 150 RPM, 9K TQ, 63% F/O, 11.91 ppg ECD, 143 UP WT, 113K DN WT, 124K ROT WT. ADT - 5.54, BIT HRS - 39.9, JAR HOURS - 65.66. SIMOPS - CONT WITH BIT BALLING SWEEPS. ADD CUP OF SAPP AT CONNECTIONS 5,870.0 6,389.0 8/14/2022 18:00 8/15/2022 00:00 6.00 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 6,389' MD T/ 6,745' MD – 3,228' TVD, 10K WOB 1000 GPM, 2413 PSI, 150 RPM, 9K TQ, 63% F/O, 11.91 ppg ECD, 143 UP WT, 113K DN WT, 124K ROT WT. ADT - 4.2, BIT HRS - 44.1, JAR HOURS - 69.86. SIMOPS - CONT WITH BIT BALLING SWEEPS, ADD CUP OF SAPP AT CONNECTIONS DUMP AND DILUTE 300 BBLS @ 6,744' MD 6,389.0 6,745.0 8/15/2022 00:00 8/15/2022 06:00 6.00 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 6,745' MD T/ 7,215' MD – 3,288' TVD, 9K WOB 1000 GPM, 2425 PSI, 150 RPM, 9K TQ, 63% F/O, 12.05 ppg ECD, 143 UP WT, 113K DN WT, 124K ROT WT. .ADT - 5.05, BIT HRS - 49.15, JAR HOURS - 74.91 SIMOPS - CONT WITH BIT BALLING SWEEPS, ADD CUP OF SAPP AT CONNECTIONS 6,745.0 7,215.0 8/15/2022 06:00 8/15/2022 12:00 6.00 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 7,215' MD T/ 7,551' MD – 3,337' TVD, 4K WOB 1000 GPM, 2448 PSI, 150 RPM, 10K TQ, 63% F/O, 11.93 ppg ECD, 153 UP WT, 113K DN WT, 130K ROT WT. ADT - 5.04, BIT HRS - 54.19, JAR HOURS - 79.95. SIMOPS - CONT WITH BIT BALLING SWEEPS, ADD CUP OF SAPP AT CONNECTIONS 7,215.0 7,551.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 18/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/15/2022 12:00 8/15/2022 18:00 6.00 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 7,551' MD T/ 7,950' MD – 3,395' TVD, 10K WOB 1000 GPM, 2558 PSI, 150 RPM, 10K TQ, 63% F/O, 12.1 ppg ECD, 158 UP WT, 129K DN WT, 129K ROT WT. ADT - 5.34, BIT HRS - 59.53, JAR HOURS - 85.29. SIMOPS - CONT WITH BIT BALLING SWEEPS, ADD CUP OF SAPP AT CONNECTIONS DUMP AND DILUTE 300 BBLS @ 7,880' MD 7,551.0 7,950.0 8/15/2022 18:00 8/15/2022 23:30 5.50 INTRM1, DRILL DDRL P DRILL 12¼ INTERMEDIATE HOLE SECTION #1 FROM 7,950 MD T/ 8,329' MD – 3,450' TVD, 10K WOB 1000 GPM, 2617 PSI, 140 RPM, 10K TQ, 63% F/O, 12.14 ppg ECD, 161 UP WT, 115K DN WT, 129K ROT WT. ADT - 4.53 BIT HRS - 64.06, JAR HOURS - 89.82. SIMOPS - CONT WITH BIT BALLING SWEEPS, ADD CUP OF SAPP AT CONNECTIONS 7,950.0 8,329.0 8/15/2022 23:30 8/16/2022 00:00 0.50 INTRM1, CASING CIRC P OBTAIN FINAL SPR'S AND SURVEY @ 8,329' MD. PREP MUD PITS / ROCKWASHER FOR 600 BBL DUMP AND DILUTE. 8,329.0 8,329.0 8/16/2022 00:00 8/16/2022 06:00 6.00 INTRM1, CASING BKRM P BROOH F/ 8,329' MD T/ 7,123 @ W/ 1000 GPM, 2348 PSI, 63% F/O, 150 RPM, 8K TQ, ECD - 12.11, 118K UP WT AT RATE. SIMOPS - DUMP AND DILUTE 600 BBLS OF 11.0 PPG LSND. 7,870' MD - CAT3 VOLUME - 95% SMALL, MODERATE CLAY CUTTINGS LOAD 7,250' MD - CAT3 VOLUME - 90% SMALL, 5% LARGE, MODERATE CLAY CUTTINGS LOAD, APPERANCE OF LARGER CHUNKS 8,329.0 7,123.0 8/16/2022 06:00 8/16/2022 12:00 6.00 INTRM1, CASING BKRM P BROOH F/ 7,123' MD T/ 5,828' MD W/ 1000 GPM, 2,153 PSI, 63% F/O, 150 RPM, 10K TQ, ECD - 11.59, 111K UP WT AT RATE. SIMOPS. CONT TO PUMP BIT BALLING SWEEPS EVERY OTHER STAND 6,880,' MD CAT3 VOLUME - 90% SMALL, MODERATE CLAY CUTTINGS LOAD MADD PASS AT 6,980' MD T/ 6,800' @ 150 FT/HR 7,123.0 5,828.0 8/16/2022 12:00 8/16/2022 18:00 6.00 INTRM1, CASING BKRM P BROOH F/ 5,828' MD T/ 4,380' MD W/ 1000 GPM, 2020 PSI, 63% F/O, 120 RPM, 8K TQ, ECD - 11.56, 111K UP WT AT RATE. SIMOPS. CONT TO PUMP BIT BALLING SWEEPS EVERY OTHER STAND 5,435,' MD CAT3 VOLUME - 85% SMALL, MODERATE CLAY CUTTINGS LOAD OCCASIONAL 4-6" CHUNKS MADD PASS AT 5,896' MD T/ 5,566' MD @ 150 FT/HR. 5,828.0 4,380.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 19/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/16/2022 18:00 8/17/2022 00:00 6.00 INTRM1, CASING BKRM P BROOH F/ 4,380' MD T/ 2,982' MD W/ 1000 GPM, 1843 PSI, 63% F/O, 80 RPM, 7K TQ, ECD - 11.33, 113K UP WT AT RATE. SIMOPS. CONT TO PUMP BIT BALLING SWEEPS EVERY OTHER STAND 3,770' MD CAT3 VOLUME - 85% SMALL, MODERATER CLAY CUTTINGS LOAD, INCREASED PRESENCE OF 4"-6" CHUNKS 3,220' MD CAT3 VOLUME - 90% SMALL, MODERATER CLAY CUTTINGS LOAD, SLIGHT INCREASED IN LARGER CHUNKS MADD PASS AT 3,530' MD T/ 3,200' MD @ 150 FT/HR. 4,380.0 2,982.0 8/17/2022 00:00 8/17/2022 06:00 6.00 INTRM1, CASING BKRM P BROOH F/ 2,982' MD T/ 446 MD W/ 1000 GPM, 1665 PSI, 63% F/O, 75 RPM, 2K TQ, ECD - 11.32, 73K UP WT AT RATE. SIMOPS. CONT TO PUMP BIT BALLING SWEEPS EVERY OTHER STAND 2,980' MD CAT2 VOLUME - 90% SMALL, LIGHT CLAY CUTTINGS LOAD, DECREASE IN LARGER MATERIAL 2,982.0 1,190.0 8/17/2022 06:00 8/17/2022 12:00 6.00 INTRM1, CASING BHAH P B/D TD, OWFF, PJSM, L/D BHA #2 AS PER SLMB DD/MWD F/ 446' MD. MONITOR DISP VIA TT. CLEAR AND CLEAN RIG FLOOR. 1,190.0 0.0 8/17/2022 12:00 8/17/2022 13:00 1.00 INTRM1, CASING WWWH P M/U STACK FLUSHING TOOL. FLUSH STACK @ 900 GPM, 155 PSI, 60% F/O. PASSING THROUGH STACK 4X. 0.0 0.0 8/17/2022 13:00 8/17/2022 14:00 1.00 INTRM1, CASING RURD P PULL WEAR BUSHING AND INSTALL TEST PLUG PER FMC REP. 0.0 0.0 8/17/2022 14:00 8/17/2022 17:00 3.00 INTRM1, CASING RURD P CLOSE BLIND/SHEAR RAMS. C/O UPPER PIPE RAMS TO 9 5/8". SIMOPS - R/D SQUEEZE JOB CEMENT SWIVEL. PREP RIG FLOOR FOR TESTING RAMS/ANNULAR 0.0 0.0 8/17/2022 17:00 8/17/2022 18:30 1.50 INTRM1, CASING BOPE P TEST 9 5/8" UPPER RAMS, ANNULAR, & 4½ IF FOSV T/ 250 LOW, 3500 HIGH F/ 5/5 CHARTED MIN.(GOOD) R/D & B/D TEST EQUIPMENT. 0.0 0.0 8/17/2022 18:30 8/17/2022 21:30 3.00 INTRM1, CASING RURD P P/U & R/U 9 5/8" 40# L-80 CSG RUNNING EQUIPMENT. SIMOPS - M/U LANDING JT/PUP/9 5/8" HANGER AND MAKE DUMMY RUN. 0.0 0.0 8/17/2022 21:30 8/17/2022 23:45 2.25 INTRM1, CASING PUTB P P/U AND M/U 9 5/8" SHOE TRACK T/ 206' MD. BAKERLOK TO PIN END OF JT #5. CHECK FLOATS (GOOD). MONITOR DISP VIA PIT #5 0.0 206.0 8/17/2022 23:45 8/18/2022 00:00 0.25 INTRM1, CASING PUTB P RIH W/ 9 5/8" 40# L-80 TXP/H563 CSG F/ 206' MD T/ 323' MD. MONITOR DISP VIA PIT #5. 206.0 323.0 8/18/2022 00:00 8/18/2022 05:30 5.50 INTRM1, CASING PUTB P RIH W/ 9 5/8" 40# L-80 TXP/H563 CSG F/ 323' MD T/ 2,710' MD. FILLING ON THE FLY VIA VOLANT CRT. TOPPING OFF EVERY 10 JTS. MONITOR DISP VIA PIT #5. TORQUE TXP CONNECTIONS TO 20,960 FT/LBS 323.0 2,710.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 20/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/18/2022 05:30 8/18/2022 06:45 1.25 INTRM1, CASING CIRC P AT 2,710' MD STAGE PUMPS UP F/ 2 BPM, 84 GPM, ICP - 121 PSI, 28% F/O TO 8 BPM, 336 GPM, FCP - 206, 43% F/O. TORQUE AND DRAG VALUES @ 4 BPM - 146 PSI, 34% F/O - 20 RPM, 4K TQ, UP WT - 122K, S/O WT - 115K, ROT WT - 118K WITH OUT PUMPS - 20 RPM - 4K TQ, UP WT - 127K, S/O WT - 118K, ROT WT - 123K 2,710.0 2,710.0 8/18/2022 06:45 8/18/2022 13:15 6.50 INTRM1, CASING PUTB P RIH W/ 9 5/8" 40# L-80 TXP/H563 CSG F/ 2,710' MD TO 5,375' MD. FILLING ON THE FLY VIA VOLANT CRT. TOPPING OFF EVERY 10 JTS. MONITOR DISP VIA PIT #5. S/O WT - 124K. TORQUE TXP CONNECTIONS TO 20,960 FT/LBS OBSERVE DISPLACEMENT INCORRECT AND 97 VIS RETURNS ON MUD. DECISION MADE TO CIRC 2,710.0 2,710.0 8/18/2022 13:15 8/18/2022 15:45 2.50 INTRM1, CASING CIRC P RECIP PIPE F/ 5,370' MD T/ 5,390' MD STAGING PUMPS UP F/ 94 GPM, 194 PSI, 28% F/O, T/ 300 GPM, 235 PSI, 40% F/O, UP WT - 153K, S/O WT - 120K. TOTAL STKS PUMPED - 6444. 2,710.0 5,390.0 8/18/2022 15:45 8/18/2022 19:00 3.25 INTRM1, CASING PUTB P RIH W/ 9 5/8" 40# L-80 TXP/H563 CSG F/ 5,390' MD TO FINAL TXP XO JT AT 6,394' MD. FILLING ON THE FLY VIA VOLANT CRT. TOPPING OFF EVERY 10 JTS. MONITOR DISP VIA PIT #5. TORQUE TXP CONNECTIONS TO 20,960 FT/LBS 5,390.0 6,394.0 8/18/2022 19:00 8/19/2022 00:00 5.00 INTRM1, CASING PUTB P RIH W/ 9 5/8" 40# L-80 TXP/H563 CSG F/ 6,394' MD TO 8,076' MD. FILLING ON THE FLY VIA VOLANT CRT. TOPPING OFF EVERY 10 JTS. MONITOR DISP VIA PIT #5. TORQUE HYDRILL 563 CONNECTIONS TO 13,000 FT/LBS 6,394.0 8,076.0 8/19/2022 00:00 8/19/2022 00:45 0.75 INTRM1, CASING PUTB P RIH W/ 9 5/8" 40# L-80 TXP/H563 CSG F/ 8,076' MD TO 8,282' MD. FILLING ON THE FLY VIA VOLANT CRT. TOPPING OFF EVERY 10 JTS. MONITOR DISP VIA PIT #5. TORQUE HYDRILL 563 CONNECTIONS TO 13,000 FT/LBS 8,076.0 8,282.0 8/19/2022 00:45 8/19/2022 01:15 0.50 INTRM1, CASING PUTB P P/U LANDING JT. M/U HANGER. RIH F/ 8,282' MD AND WASH DN @ 2 BPM, 118 PSI, 30% F/O. S/O WT - 123K. LAND HANGER ON DEPTH @ 8,324' MD. 8,282.0 8,324.0 8/19/2022 01:15 8/19/2022 03:30 2.25 INTRM1, CEMENT CIRC P RECIP PIPE F/ 8,324' MD TO 8,304' MD CONDITION MUD AS PER SLMB MUD ENGINEER, STAGING PUMPS UP F/ 2 BPM, 84 GPM, ICP - 118, 30% F/O TO 7 BPM, 300 GPM, FCP - 312, 40% F/O. UP WT - 200K, S/O WT - 130K 8,324.0 8,324.0 8/19/2022 03:30 8/19/2022 04:15 0.75 INTRM1, CEMENT RURD P B/D TD. INSTALL CEMENT HOSE AND MANIFOLD TO VOLANT CRT. 8,324.0 8,324.0 8/19/2022 04:15 8/19/2022 06:00 1.75 INTRM1, CEMENT CIRC P CONT TO RECIP PIPE F/ 8,324' MD TO 8,304' MD CONDITION MUD AS PER SLMB MUD ENGINEER, RAMP PUMPS UP TO 7 BPM, 300 GPM, 470 PSI, 40% F/O. UP WT - 200K, S/O WT - 130K 8,324.0 8,324.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 21/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/19/2022 06:00 8/19/2022 09:45 3.75 INTRM1, CEMENT CMNT P SWAP TO CEMENTERS. FLOOD LINES W/ WATER AND PT TO 3500 PSI (GOOD). RECIP PIPE F/ 8,324' MD T/ 8,304' MD. PUMP 63 BBLS 13.0 PPG MUD PUSH @ 4 BPM, 250 PSI, 30% F/O. DROP BTM PLUG. CHASE PLUG WITH 141 BBLS OF 15.8 PPG CEMENT@ 4.4 BPM, 34% F/O 200 PSI. DROP TOP PLUG. CHASE PLUG W/ 20 BBLS OF WATER @ 5.3 BPM, 140 PSI, 25% F/O. SWAP TO RIG PUMPS. PUMP TREATED 11.0 LSND AT 6 BPM, ICP - 250, FCP - 450, 38% F/O. UP WT - 200K, S/O WT - 130K. AT 4700 STKS OBSERVE HOOKLOAD DROP TO 88K SET CSG ON HANGER. REDUCE RATE TO 3 BPM, 380 PSI, 30% F/O. BUMP PLUG AT 5097 STKS. PRESSURE UP T/ 900 PSI. HOLD FOR 5 MIN. BLEED OFF CHECK FLOATS (GOOD). CIP @ 9:45. 8,324.0 8,324.0 8/19/2022 09:45 8/19/2022 13:00 3.25 INTRM1, CEMENT RURD P B/O TOP PUP ON LANDING JT, L/D LANDING JT, R/D CSG RUNNING EQUIPMENT, CLEAR AND CLEAN RIG FLOOR. 8,324.0 8,324.0 8/19/2022 13:00 8/19/2022 14:30 1.50 INTRM1, CEMENT WWSP P P/U AND SET 13 3/8" X 9 5/8" PACKOFF AS PER FMC. TEST TO 5,000 PSI FOR 10 MIN. WITNESSED BY CPAI REP. 8,324.0 8,324.0 8/19/2022 14:30 8/19/2022 17:00 2.50 INTRM1, CEMENT RURD P C/O SAVER SUB TO 4½ IF. SIMOPS - CHANGE UPPER RAMS TO 3½ X 6 VBR'S. 8,324.0 8,324.0 8/19/2022 17:00 8/20/2022 00:00 7.00 INTRM1, CEMENT RURD P PROCESS 5" DP, 4" DP, AND INTERMEDIATE 2 BHA IN PIPESHED. SIMOPS - C/O CHARGE PUMP ON #1 MP. C/O MUD PUMP #2 LINERS TO 5½.. COMPLETE MP2 ON ACCUMULATOR BACK UP BOTTLES. 8,324.0 8,324.0 8/20/2022 00:00 8/20/2022 02:00 2.00 INTRM1, WHDBOP BOPE P INSTALL TEST PLUG. FLOOD LINES AND SHELL TEST BOPE T/ 3500 PSI. (GOOD)TEST BOPE TO 250 LOW, 3500 HIGH F/ 5/5 CHARTED MIN W/ 4 AND 5" TEST JTS. SIMOPS - DRESS #1 PUMP WITH 5½ SWABS/LINERS. 8,324.0 8,324.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 22/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/20/2022 02:00 8/20/2022 11:30 9.50 INTRM1, WHDBOP BOPE P TEST BOPE W/ 5" TEST JT, TEST ANNULAR T/ 250 LOW, 2500 HIGH. TEST UPPER & LOWER VBR'S, CHOKE VALVES 1-14, MEZZ KILL, MUD MANIFOLD KILL, HCR KILL. MAN KILL, 2 EA 4½ IF FOSV AND 1 EA DART, 2EA XT39 FOSV AND 1 EA DART. UPPER IBOP - LOWER IBOP (failed), BLIND/SHEAR RAMS TO 250 LOW, 3500 HIGH, W/ 4" TEST JT TEST ANNULAR TO 250 LOW, 2500 HIGH, UPPER AND LOWER VBR'S, MAN CHOKE, HCR CHOKE TO 250 LOW, 3500 HIGH, MANUAL AND HYD CHOKES TESTED TO 250 LOW, 2000 HIGH, PERFORM ACC DRAWDOWN TEST - ACC-3000 PSI, MANIF - 1500 psi, ACC - 1800 AFTER ALL FUNCTIONS, 10 SEC TO BUILD 200 PSI, 52 SEC TO BUILD FULL SYSTEM PSI W/ 2 AIR PUMPS AND 2 ELECTRICAL PUMPS, TEST PVT GAIN -LOSS, FLOW OUT, & H2S AND LEL. AOCGG REP GUY COOK WAIVED WITNESS TO THE TEST AT 06:49 ON 8-19-22 8,324.0 8,324.0 8/20/2022 11:30 8/20/2022 13:00 1.50 INTRM1, WHDBOP RURD P PULL TEST PLUG C/O MASTER BUSHINGS TO SPLIT MASTER BUSHINGS. R/D & B/D TESTING EQUIPMENT - (4 EA FOSV AND 2 EA DART VALVES.) 8,324.0 8,324.0 8/20/2022 13:00 8/20/2022 18:00 5.00 INTRM1, WHDBOP LOT P ATTEMPT TO ANNULAR INJECT DN 13 3/8" X 9 5/8" ANNULAR W/ 11.0 PPG W/ RIG PUMPS. FAILED (UNABLE TO ACHIEVE LOT) OBSERVE 471 PSI(MAX) AT SURFACE. SIMOPS - REMOVE LOWER IBOP ON TDS-11. 8,324.0 8,324.0 8/20/2022 18:00 8/20/2022 20:30 2.50 INTRM1, WHDBOP RGRP T INSTALL NEW LOWER IBOP ON TDS- 11. RE-INSTALL TQ RINGS(X2). TQ TO 185 FT/LBS. RE-TIE WIRE BOLTS. TEST LOWER IBOP TO 250 LOW, 3500 HIGH F/ 5/5 CHARTED MIN (GOOD). 8,324.0 8,324.0 8/20/2022 20:30 8/20/2022 21:30 1.00 INTRM1, WHDBOP RURD P R/D TEST EQUIPMENT. INSTALL 9” ID SHORTY WEAR BUSHING AS PER FMC. RILDS (X2). 8,324.0 8,324.0 8/20/2022 21:30 8/21/2022 00:00 2.50 INTRM1, DRILLOUT BHAH P P/U AND M/U INTERMEDIATE 2 BHA AS PER SLMB DD T/ 161' MD. MONITOR DISP VIA TT. 0.0 160.0 8/21/2022 00:00 8/21/2022 01:30 1.50 INTRM1, DRILLOUT BHAH P CONT TO P/U BHA F/ 161' MD T/ 620' MD. MONITOR DISP VIA TT. 160.0 620.0 8/21/2022 01:30 8/21/2022 03:15 1.75 INTRM1, DRILLOUT PULD P RIH W/ INTERMEDIATE 2 BHA F/ 620' MD T/ 2075' MD PICKING UP 4" XT39 DP 1X1. MONITOR DISP VIA TT. 620.0 2,075.0 8/21/2022 03:15 8/21/2022 03:45 0.50 INTRM1, DRILLOUT RGRP T BLACK OUT RIG. C-27 UNABLE TO FIRE. CALL ELECTRICIAN TO TROUBLESHOOT. 2,075.0 2,075.0 8/21/2022 03:45 8/21/2022 04:15 0.50 INTRM1, DRILLOUT SVRG P INSPECT AIR SLIP BACK SAVERS AND SKATE. 2,075.0 2,075.0 8/21/2022 04:15 8/21/2022 04:45 0.50 INTRM1, DRILLOUT PULD P CONT TO RIH W/ INTERMEDIATE 2 BHA ON 4" XT39 DP 1X1 FROM PIPESHED F/ 2,075' MD T/ 2,530' MD. MONITOR DISP VIA TT. S/O WT - 74K 2,075.0 2,530.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 23/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/21/2022 04:45 8/21/2022 05:15 0.50 INTRM1, DRILLOUT DHEQ P SHALLOW HOLE TEST MWD @ 2,530' MD AS PER DD W/ 500 GPM, 2111 PSI, 55% F/O. 2,530.0 2,530.0 8/21/2022 05:15 8/21/2022 07:15 2.00 INTRM1, DRILLOUT PULD P CONT TO RIH W/ INTERMEDIATE 2 BHA ON 4" XT39 DP 1X1 FROM PIPESHED F/ 2,530' MD T/ 3,365' MD. MONITOR DISP VIA TT. UP WT - 90K, S/O WT - 98K. 2,530.0 3,365.0 8/21/2022 07:15 8/21/2022 11:00 3.75 INTRM1, DRILLOUT TRIP T OBSERVE INCORRECT RABBIT BEING USED. STOP P/U PIPE AND DROP 2.15 RABBIT INSTRING. POOH ON ELEVATORS F/ 3,365' MD 620' MD STANDING STANDS BACK IN THE DERRICK. MONITOR DISP VIA TT. FIND RABBIT IN FIRST JT OF HWDP. 3,365.0 620.0 8/21/2022 11:00 8/21/2022 13:15 2.25 INTRM1, DRILLOUT TRIP T RIH F/ 620' MD T/ 3,365' MD ON ELEVATORS W/ 4" XT39 DP. MONITOR DISP VIA TT. FILLING PIPE EVERY 20 STDS. 620.0 3,365.0 8/21/2022 13:15 8/21/2022 15:30 2.25 INTRM1, DRILLOUT PULD P CONT TO RIH W/ INTERMEDIATE 2 BHA ON 4" XT39 DP 1X1 FROM PIPESHED F/ 3,365' MD T/ 4,590' MD. MONITOR DISP VIA TT. S/O WT - 94K 3,365.0 4,590.0 8/21/2022 15:30 8/21/2022 16:15 0.75 INTRM1, DRILLOUT CIRC P CIRC B/U W/ 445 GPM, 2082 PSI, 47% F/O. TOTAL STKS PUMPED - 3784. 4,590.0 4,590.0 8/21/2022 16:15 8/21/2022 17:00 0.75 INTRM1, DRILLOUT PULD P CONT TO RIH W/ INTERMEDIATE 2 BHA ON 5"NC50 DP 1X1 FROM PIPESHED F/ 4,590' MD T/ 4,719' MD. MONITOR DISP VIA TT 4,590.0 4,719.0 8/21/2022 17:00 8/21/2022 22:30 5.50 INTRM1, DRILLOUT MPDA P PULL TRIP NIPPLE. INSTALL MPD BEARING AND DRAIN NIPPLE. COMMISION MPD CHOKES AND TRAIN CREW. 4,719.0 4,719.0 8/21/2022 22:30 8/22/2022 00:00 1.50 INTRM1, DRILLOUT MPDA P CONT WITH TRAINING CREW ON MPD OPS. PULL BEARING AND DRAIN NIPPLE, INSTALL TRIP NIPPLE. 4,719.0 4,719.0 8/22/2022 00:00 8/22/2022 01:30 1.50 INTRM1, DRILLOUT LOT P ATTEMPT TO ANNULAR INJECT DN 13 3/8" X 9 5/8" ANNULAR W/ 11.0 PPG W/ RIG PUMP. FAILED (UNABLE TO ACHIEVE LOT) OBSERVE 533 PSI (MAX) AT SURFACE @ 55 STKS PUMPED(4.7 BBLS). BLED DN 10 PSI IN 10 MIN. BLED BACK 1.4 BBLS TO TT. R/D AND B/D SURFACE LINES. 4,719.0 4,719.0 8/22/2022 01:30 8/22/2022 07:00 5.50 INTRM1, DRILLOUT PULD P CONT TO RIH W/ INTERMEDIATE 2 BHA ON 5" NC50 DP 1X1 FROM PIPESHED F/ 4,719' MD T/ 8,082' MD. MONITOR DISP VIA TT. UP WT - 130K, S/O WT - 68K. 4,719.0 8,082.0 8/22/2022 07:00 8/22/2022 09:30 2.50 INTRM1, DRILLOUT SLPC P CUT AND SLIP 60' OF 1.375 DRILL LINE. SIMOPS - CONDITION MUD W/ 6 BPM, 250 GPM, 964 PSI, 36% F/O. TOTAL STKS PUMPED - 8,769 8,082.0 8,082.0 8/22/2022 09:30 8/22/2022 11:00 1.50 INTRM1, DRILLOUT CIRC P ROT AND RECIP PIPE F/ 8,068' MD T/ 8,082' MD W/ 448 GPM, 2,437 PSI, 51% F/O, 20 RPM, 8K TQ, UP WT - 130K, S/O WT - 68K. ROT WT - 103K. TOTAL STKS PUMPED 16,282. 8,082.0 8,082.0 8/22/2022 11:00 8/22/2022 12:30 1.50 INTRM1, DRILLOUT PRTS P R/U AND TEST 9 5/8" CSG TO 3000 PSI FOR 30 CHARTED MIN (GOOD) 8,082.0 8,082.0 8/22/2022 12:30 8/22/2022 12:45 0.25 INTRM1, DRILLOUT PULD P CONT TO RIH W/ INTERMEDIATE 2 BHA ON 5" NC50 DP 1X1 FROM PIPESHED F/ 8,082' MD T/ 8,184' MD. 8,082.0 8,184.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 24/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/22/2022 12:45 8/22/2022 13:15 0.50 INTRM1, DRILLOUT COCF P WASH DN F/ 8,184' MD TO TOP OF PLUGS/CEMENT AT 8,235' MD W/ 400 GPM, 2,214PSI, 47% F/O. SET DN 8K, S/O WT - 79K. 8,184.0 8,235.0 8/22/2022 13:15 8/22/2022 23:00 9.75 INTRM1, DRILLOUT DRLG P DRILL CEMENT PLUGS, FLOAT COLLAR, CEMENT, SHOE, AND RAT HOLE F/ 8,235' MD T/ 8329' MD W/ 500 GPM, 3360 PSI, 52% F/O, 30-60 RPM, 11TQ, 5-6 WOB. 8,235.0 8,329.0 8/22/2022 23:00 8/22/2022 23:15 0.25 INTRM1, DRILLOUT DDRL P DRILL AHEAD F/ 8,329' MD T/ 8,349' MD W/ 500 GPM, 3270 PSI, 52% F/O, 60 RPM, 11.5TQ, 10 WOB. 8,329.0 8,349.0 8/22/2022 23:15 8/23/2022 00:00 0.75 INTRM1, DRILLOUT CIRC P ROT AND RECIP PIPE F/ 8,349' MD T/ 8,183' MD W/ 500 GPM, 3164 PSI, 51% F/O, 40 RPM, 10K TQ, UP WT - 98K, S/O WT - 100K AT DRILLING RATE. 8,349.0 8,183.0 8/23/2022 00:00 8/23/2022 00:45 0.75 INTRM1, DRILLOUT CIRC P ROT AND RECIP PIPE F/ 8,349' MD T/ 8,183' MD W/ 500 GPM, 3186 PSI, 51% F/O, 40 RPM, 10K TQ, UP WT - 98K, S/O WT - 100K AT DRILLING RATE. TOTAL STKS PUMPED - 8618 8,183.0 8,349.0 8/23/2022 00:45 8/23/2022 01:30 0.75 INTRM1, DRILLOUT FIT P AT 8,279' MD FLOOD LINES, CLOSE UPPER VBR'S AND PERFORM FIT W/ 11.0 PPG LSND. ACHIEVE 840 PSI, 15.7 EMW, 2.1 BBLS PUMPED, 2 BBLS BLED BACK. 8,349.0 8,279.0 8/23/2022 01:30 8/23/2022 02:30 1.00 INTRM2, DRILL MPDA P PULL TRIP NIPPLE, INSTALL MPD BEARING AND DRAIN NIPPLE AS PER BEYOND REP. 8,279.0 8,279.0 8/23/2022 02:30 8/23/2022 03:30 1.00 INTRM2, DRILL CIRC P WASH DN F/ 8,279' MD T/ 8,349' MD W/ 500 GPM, 3300 PSI, 50% F/O, 40 RPM, 11K TQ, 99K S/O WT AT RATE. SIMOPS - PJSM ON DISPLACING WELL TO 9.2 PPG LSND 8,279.0 8,349.0 8/23/2022 03:30 8/23/2022 06:30 3.00 INTRM2, DRILL DISP P ROT AND RECIP PIPE F/ 8,349' MD T/ 8,279' MD & DISPLACE 11.0 PPG LSND W/ 9.2 PPG LSND @ 100 GPM, ICP - 605 W/ MPD HOLDING 50 PSI BACK PRESSURE, INCREASE RT TO 500 GPM, 1968 PSI, 60 RPM, 9K TQ, 55% F/O. UP WT - 122K, S/O WT - 77K, ROT WT - 104K. OBTAIN SPR'S. 8,349.0 8,349.0 8/23/2022 06:30 8/23/2022 12:00 5.50 INTRM2, DRILL DDRL P DRILL 8¾ INTERMEDIATE 2 HOLE SECTION F/ 8,349' MD T/ 8,814' MD 3,521' TVD, WOB - 8-15K, GPM, 516, 1975 PSI, RPM, 140, 9K TQ, F/O % 54, ECD - 11.32, UP WT - 128K, S/O WT - 72K, ROT WT - 99K. BIT HRS - 4.32 UNSUCCESSFUL HOLDING 410 PSI ON CONNECTION - WELLBORE BLED DN TO 50. 8,349.0 8,814.0 8/23/2022 12:00 8/23/2022 19:00 7.00 INTRM2, DRILL DDRL P DRILL 8¾ INTERMEDIATE 2 HOLE SECTION F/ 8,814' MD T/ 9,124' MD, 3,566' TVD, WOB - 11K, GPM, 516, 2107 PSI, 140 PM, 12-14K TQ, F/O % 55, ECD - 11.39, UP WT - 148K, S/O WT - 68K, ROT WT - 101K. BIT HRS - 7.92 HOLDING 400 - 410 PSI ON CONNECTION VIA MPD 8,814.0 9,124.0 8/23/2022 19:00 8/23/2022 21:30 2.50 INTRM2, DRILL BKRM T OBSERVE POOR DRILLING PERAMETERS, ie. (PACKOFFS, TQ SWINGS). DECISION MADE TO BROOH F/ 9,124' MD T/ 8,180' MD W/ 509 GPM, 2037 PSI, 57% F/O, 120 RPM, 10K TQ, ECD - 11.18, 104K ROT WT WHILE PULLING. 9,124.0 8,180.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 25/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/23/2022 21:30 8/23/2022 22:45 1.25 INTRM2, DRILL CIRC T ROT AND RECIP PIPE FROM 8,184' MD T/ 8,085' MD. PUMP HI VIS SWEEP S/S W/ 523 GPM, 2088 PSI, 54% F/O, 10.89 ECD, 60 RPM, 7 TQ. UP WT 103K, S/O WT 97K WHILE AT RATE. TOTAL STKS PUMPED - 9873. OBSERVE 124K P/U WT, AND 54K S/O WT. OBSERVE 10% CUTTINGS INCREASE ON SWEEP RETURN. 8,180.0 8,085.0 8/23/2022 22:45 8/24/2022 00:00 1.25 INTRM2, DRILL CIRC T DROP 2.115 OD STEEL BALL AND PUMP DN @ 250 GPM, 886 PSI, 36% F/O. REDUCE RT AT 540 STKS T/ 125 GPM, 640 PSI, 30% F/O. BALL ON SEAT AT 734 STKS. PRESSURE UP TO 1953 PSI AND OBSERVE WELL COMMANDER OPEN. CONT TO CIRC @ 700 GPM, 2078 PSI, 60% F/O. ROT AND RECIP PIPE F/ 8,180' MD T/ 8,085' MD. SIMOPS - PUMP HI VIS SWEEP S/S. 8,085.0 8,180.0 8/24/2022 00:00 8/24/2022 00:45 0.75 INTRM2, DRILL CIRC T CONT TO CIRC @ 700 GPM, 2078 PSI, 60% F/O. ROT AND RECIP PIPE F/ 8,180' MD T/ 8,085' MD. SIMOPS - PUMP HI VIS SWEEP S/S. TOTALS STKS PUMPED - 12,909. OBSERVE MINIMAL RETURNS ON SWEEP. 8,180.0 8,085.0 8/24/2022 00:45 8/24/2022 01:30 0.75 INTRM2, DRILL DHEQ T DROP 2.115 OD STEEL BALL AND PUMP DN @ 250 GPM, 600 PSI, 40% F/O. REDUCE RT AT 540 STKS T/ 135 GPM, 575 PSI, 34% F/O. BALL ON SEAT AT 710 STKS. PRESSURE UP TO 1929 PSI AND OBSERVE WELL COMMANDER CLOSE. CONFIRM CLOSED W/ MWD ACTIVATION AT 500 GPM. 8,085.0 8,180.0 8/24/2022 01:30 8/24/2022 02:30 1.00 INTRM2, DRILL TRIP T LINE UP MPD ON BACK SIDE VIA PUMP #2 LINED UP TO RCD HEAD. TIH F/ 8,180' MD T/ 9,025' MD. UP WT - 124K, S/O WT - 85K. MONITOR DISP VIA ACTIVE PITS. 8,180.0 9,025.0 8/24/2022 02:30 8/24/2022 03:30 1.00 INTRM2, DRILL CIRC T WASH DN AND CIRC B/U F/ 9,025' MD T/ 9,124' MD W/ 500 GPM, 2046 PSI, 55% F/O, 76 RPM, 5K TQ, ECD - 10.8, UP WT @ RATE - 103K, S/O WT AT RATE - 102K. TOTAL STKS PUMPED - 6932 9,025.0 9,124.0 8/24/2022 03:30 8/24/2022 06:00 2.50 INTRM2, DRILL DDRL P DRILL 8¾ INTERMEDIATE 2 HOLE SECTION F/ 9,124' MD T/ 9,335' MD TVD 3,598' MD, WOB - 8K, GPM, 520, 2222 PSI, 120 PM, 9-11K TQ, F/O 55%, ECD - 11.12, UP WT - 148K, S/O WT - 68K, ROT WT - 101K. BIT HRS - 9.69 HOLDING 400 - 410 PSI ON CONNECTION VIA MPD PUMPING NUT PLUG SWEEPS EVERY OTHER STAND 9,124.0 9,335.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 26/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/24/2022 06:00 8/24/2022 10:00 4.00 INTRM2, DRILL DDRL P DRILL 8¾ INTERMEDIATE 2 HOLE SECTION F/ 9,335' MD T/ 9,770' MD, WOB - 9K, GPM, 515, 2140 PSI, 120 PM, 12-14K TQ, F/O % 55, ECD - 11.17, UP WT - 140K, S/O WT - 78K, ROT WT - 104K. HOLDING 410 PSI ON CONNECTION VIA MPD PUMPING NUT PLUG SWEEPS EVERY OTHER STAND. SIMOPS - LRS OPS - TEST #1. LRS SPENT 2.5 HRS ATTEMPTING TO FREEZE PROTECT THE OA. THEY VARIED PERAMETERS AND FLOW RATES TARGETING MAX PSI OF 530. (PUMPED TOTAL OF 2.69 BBLS / BLED BACK 2.34 bbls) 9,335.0 9,770.0 8/24/2022 10:00 8/24/2022 11:30 1.50 INTRM2, DRILL CIRC T OBSERVE 100% PACKOFF AT 9,770' MD. REDUCE RATE TO 40-124 GPM, RPM TO 80-20 AND PICK UP STRING TO 9,690' MD. BLEED PSI TO 0. RETUN RATE TO 42 GPM, 20 RPM AND REGAIN RETURNS. CONT SLACKING OFF T/ 9,770' MD STAGING PUMPS UP TO RATE. OBSERVE HOLE UNLOADING AT B/U. 9,770.0 9,770.0 8/24/2022 11:30 8/24/2022 12:00 0.50 INTRM2, DRILL DDRL P DRILL 8¾ INTERMEDIATE 2 HOLE SECTION F/ 9,770' MD T/ 9,800' MD, WOB - 9K, GPM, 515, 2140 PSI, 120 PM, 12-14K TQ, F/O % 55, ECD - 11.17, UP WT - 140K, S/O WT - 78K, ROT WT - 104K. HOLDING 410 PSI ON CONNECTION VIA MPD PUMPING NUT PLUG SWEEPS EVERY OTHER STAND 9,770.0 9,800.0 8/24/2022 12:00 8/24/2022 17:30 5.50 INTRM2, DRILL DDRL P DRILL 8¾ INTERMEDIATE 2 HOLE SECTION F/ 9,800' MD T/ 10,205' MD, WOB - 6K, GPM, 515, 2222 PSI, 120 PM, 10-15K TQ, F/O 55%, ECD - 11.36, UP WT - 154K, S/O WT - N/A, ROT WT - 108K. HOLDING 410 PSI ON CONNECTION VIA MPD PUMPING 10 bbl NUT PLUG SWEEPS EVERY OTHER STAND. SIMOPS - LRS: TEST #2 LRS 8 HRS ATTEMPTING TO FREEZE PROTECT THE OA.. THEY VARIED PERAMETERS AND FLOW RATES TARGETING MAX PSI OF 530. (PUMPED TOTAL OF 2.78 BBLS / BLED BACK 1.28 BBLS) 9,800.0 10,205.0 8/24/2022 17:30 8/24/2022 19:15 1.75 INTRM2, DRILL CIRC T OBSERVE 100% PACKOFF AT 10,205' MD. REDUCE RATE TO 42 GPM, RPM TO 20-70 AND SLOWLY WORK UP STRING TO 10,164' MD. BLEEDING PSI TO 0 (3X) MAX PSI AT SURFACE - 830. REGAIN RETURNS. CONT TO WORK STRING F/ 10,164' MD T/ 10,250' MD STAGING PUMPS UP TO 512 GPM. TOTAL STKS PUMPED 8224. OBSERVE HOLE UNLOADING AT B/U. 10,205.0 10,250.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 27/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/24/2022 19:15 8/25/2022 00:00 4.75 INTRM2, DRILL DDRL P DRILL 8¾ INTERMEDIATE 2 HOLE SECTION F/ 10,205' MD T/ 10,445' MD, WOB - 10K, GPM, 515, 2468 PSI, 140 PM, 13-17K TQ, F/O 55%, ECD - 11.45, UP WT - 146K, S/O WT - N/A, ROT WT - 103K. BIT HRS - 20.91. HOLDING 410 PSI ON CONNECTION VIA MPD PUMPING 10 bbl NUT PLUG SWEEPS EVERY STAND,AND ADDING SAPP AT CONNECTIONS. 10,250.0 10,445.0 8/25/2022 00:00 8/25/2022 06:00 6.00 INTRM2, DRILL DDRL P DRILL 8¾ INTERMEDIATE 2 HOLE SECTION F/ 10,445' MD T/ 10,825' MD, WOB - 10K, GPM, 515, 2487 PSI, 120 PM, 13-17K TQ, 55% F/O, ECD - 11.44, UP WT - 151K, S/O WT - N/A, ROT WT - 101K. BIT HRS - 25.13. HOLDING 410 PSI ON CONNECTION VIA MPD PUMPING 10 bbl NUT PLUG SWEEPS EVERY STAND AND ADDING SAPP AT CONNECTIONS. 10,445.0 10,825.0 8/25/2022 06:00 8/25/2022 12:00 6.00 INTRM2, DRILL DDRL P DRILL 8¾ INTERMEDIATE 2 HOLE SECTION F/ 10,825' MD T/ 11,183' MD, WOB - 12K, GPM, 519, 2433 PSI, 120 PM, 13-18K TQ, 55% F/O, ECD - 11.49, UP WT - 151K, S/O WT - N/A, ROT WT - 101K. BIT HRS - 29.37. HOLDING 410 PSI ON CONNECTION VIA MPD PUMPING 10 bbl NUT PLUG SWEEPS EVERY STAND AND ADDING SAPP AT CONNECTIONS. 10,825.0 11,183.0 8/25/2022 12:00 8/25/2022 18:00 6.00 INTRM2, DRILL DDRL P DRILL 8¾ INTERMEDIATE 2 HOLE SECTION F/ 11,183' MD T/ 11,570' MD, WOB - 12K, GPM, 519, 2491 PSI, 120 PM, 13-18K TQ, 55% F/O, ECD - 11.49, UP WT - 151K, S/O WT - N/A, ROT WT - 101K. BIT HRS - 33.54 HOLDING 410 PSI ON CONNECTION VIA MPD PUMPING 10 bbl NUT PLUG SWEEPS EVERY STAND AND ADDING SAPP AT CONNECTIONS. 11,183.0 11,570.0 8/25/2022 18:00 8/26/2022 00:00 6.00 INTRM2, DRILL DDRL P DRILL 8¾ INTERMEDIATE 2 HOLE SECTION F/ 11,570' MD T/ 11,891' MD, WOB - 8K, GPM, 520, 2536 PSI, 120 PM, 13-19K TQ, 55% F/O, ECD - 11.34, UP WT - 177K, S/O WT - N/A, ROT WT - 109K. BIT HRS 37.18 HOLDING 410 PSI ON CONNECTION VIA MPD PUMPING 10 bbl NUT PLUG SWEEPS EVERY STAND AND ADDING SAPP AT CONNECTIONS. 11,570.0 11,891.0 8/26/2022 00:00 8/26/2022 06:00 6.00 INTRM2, DRILL DDRL P DRILL 8¾ INTERMEDIATE 2 HOLE SECTION F/ 11891' MD T/ 12,241,' MD, WOB - 6K, GPM- 520, 2343 PSI, 120 PM, 13-19K TQ, 55% F/O, ECD - 11.42 UP WT - 181K, S/O WT - N/A, ROT WT - 109K. BIT HRS - 41.42 HOLDING 410 PSI ON CONNECTION VIA MPD PUMPING 10 bbl NUT PLUG SWEEPS EVERY STAND AND ADDING SAPP AT CONNECTIONS. 11,891.0 12,241.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 28/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/26/2022 06:00 8/26/2022 10:00 4.00 INTRM2, DRILL DDRL P DRILL 8¾ INTERMEDIATE 2 HOLE SECTION F/ 12,241' MD T/ 12,478,' MD, WOB - 11K, GPM - 520, 2510 PSI, 120 PM, 13-19K TQ, 55% F/O, ECD - 11.38 UP WT - 185K, S/O WT - N/A, ROT WT - 111K. BIT HRS - 44.02 HOLDING 410 PSI ON CONNECTION VIA MPD PUMPING 10 bbl NUT PLUG SWEEPS EVERY STAND AND ADDING SAPP AT CONNECTIONS. 12,241.0 12,478.0 8/26/2022 10:00 8/26/2022 12:00 2.00 INTRM2, CASING CIRC P OBTAIN FINAL TQ & DRAG 185K UP WT, NA S/O, 111K ROT WT. SHOOT FINAL MWD SURVEY. CIRC BOTTOMS UP AT DRILLING RATE 520 GPM, 2305 PSI, 120 RPM, 14K TQ, WORK FULL STAND, RACK BACK STAND AND CIRCULATE ANOTHER BOTTOMS UP AT FULL RATE SAME PERAMETERS TO 12,396' MD 12,478.0 12,396.0 8/26/2022 12:00 8/26/2022 18:00 6.00 INTRM2, CASING BKRM P BROOH @ 150-350 FT/HR F/ 12,396' MD T/ 11,736' MD W/ 515 GPM, ICP - 2400, FCP - 2150 56% F/O, 10.98 ECD, GAS UNITS - 39, 120 RPM, 13K TQ, 110K UP WT WHILE AT RATE. MADD PASS F/ 11,974' MD T/ 11,721' MD @ 150 FT/HR. MPD MAINTAINING 11.1 AT CONNECTIONS AND 11.0 WHILE POOH. PUMPING 10 bbl NUT PLUG SWEEPS EVERY OTHER STAND 12,396.0 11,736.0 8/26/2022 18:00 8/27/2022 00:00 6.00 INTRM2, CASING BKRM P BROOH @ 150-350 FT/HR F/ 11,736' MD T/ 10,653' MD W/ 515 GPM, ICP - 2175, FCP - 2,208 56% F/O, 11.39 ECD, GAS UNITS - 62, 120 RPM, 13K TQ, 107K UP WT WHILE AT RATE. INCREASE MPD PSI TO 11.4 AT CONNECTIONS AND 11.3 WHILE POOH. MADD PASS F/ 11,074' MD T/ 10,821' MD & 10,924' MD TO 10,721' MD @ 150 FT/HR. PUMPING 10 bbl NUT PLUG SWEEPS EVERY OTHER STAND 11,736.0 10,653.0 8/27/2022 00:00 8/27/2022 06:00 6.00 INTRM2, CASING BKRM P BROOH @ 350-600 FT/HR F/ 10,653' MD T/ 9,830' MD W/ 520 GPM, ICP - 2,208, FCP - 2178 56% F/O, 11.43 ECD, GAS UNITS - 41, 120 RPM, 11K TQ, 107K UP WT WHILE AT RATE. INCREASE MPD PSI TO 11.4 AT CONNECTIONS AND 11.3 WHILE POOH. MADD PASS F/ 10,674' MD TO 10,421' MD & 10,374' MD TO 10,121' MD & 9,874' MD TO 9,830' MD @ 150 FT/HR. 10,653.0 9,830.0 8/27/2022 06:00 8/27/2022 12:00 6.00 INTRM2, CASING BKRM P BROOH @ 350-600 FT/HR F/ 9,830' MD T/ 8,795' MD W/ 520 GPM, ICP - 2178, FCP - 2166 56% F/O, 11.18 ECD, GAS UNITS - 44, 120 RPM, 11K TQ, 102K UP WT WHILE AT RATE. INCREASE MPD PSI TO 11.4 AT CONNECTIONS AND 11.3 WHILE POOH. MADD PASS F/ 9,830' MD T/ 9,521' MD & 8,984' MD TO 8,871' MD @ 150 FT/HR. PUMPING 10 bbl NUT PLUG SWEEPS EVERY OTHER STAND 9,830.0 8,795.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 29/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/27/2022 12:00 8/27/2022 17:30 5.50 INTRM2, CASING BKRM P BROOH @ 150-350 FT/HR F/ 8,795' MD T/ 8,182' MD W/ 520 GPM, ICP - 2166, FCP - 2058 56% F/O, 11.32 ECD, GAS UNITS - 41, 120 RPM, 11K TQ, 107K UP WT WHILE AT RATE. INCREASE MPD PSI TO 11.4 AT CONNECTIONS AND 11.3 WHILE POOH. PUMPING 10 bbl NUT PLUG SWEEPS EVERY OTHER STAND 8,795.0 8,182.0 8/27/2022 17:30 8/27/2022 20:00 2.50 INTRM2, CASING CIRC P DROP 2.115 OD STEEL BALL AND PUMP DN @ 126 GPM, 500 PSI, 24% F/O. BALL ON SEAT AT 588 STKS. PRESSURE UP TO 1966 PSI AND OBSERVE WELL COMMANDER OPEN. CONT TO CIRC @ 650 GPM, 2,009 PSI, 60% F/O. ROT AND RECIP PIPE @ 60 RPM, 10K TQ F/ 8,182' MD T/ 8,087' MD. TOTAL STKS PUMPED - 24,177. 8,182.0 8,087.0 8/27/2022 20:00 8/27/2022 22:00 2.00 INTRM2, CASING CIRC P DROP 2.115 OD STEEL BALL AND PUMP DN @ 126 GPM, 602 PSI, 24% F/O. BALL ON SEAT AT 602 STKS. PRESSURE UP TO 1946 PSI AND OBSERVE WELL COMMANDER CLOSE. CONT TO CIRC @ 520 GPM, 2125 PSI, 53% F/O. ROT AND RECIP PIPE@ 60 RPM, 10K TQ F/ 8,182' MD T/ 8,087' MD. TOTAL STKS PUMPED - 13,151 SIMOPS - HOLD PJSM FOR DISPLACING WELL TO 11.4 PPG LSND 8,087.0 8,182.0 8/27/2022 22:00 8/28/2022 00:00 2.00 INTRM2, CASING DISP P DISPLACE WELLBORE FROM 9.2 PPG LSND TO 11.4 PPG LSND. FOLLOWING MPD - MUD ENGINEER PUMP SCHEDULE. ROT AND RECIP PIPE F/ 8,182' MD T/ 8,,087' MD. ROT W/ 60 RPM, 6K TQ, PUMP 30 BBLS OF VIS SPACER, FOLLOWED BY 11.4 LSND @ 520 GPM, 2350 PSI, 61% F/O. REDUCE RATE AS PER PLAN. FINAL CIRC RATE OF 280 GPM, 1081 PSI, 42% F/O. ECD - 12.38 TOTAL STKS PUMPED - 8146. OBSERVE 11.2 MW RETURNS. OBTAIN SPR'S. SHUT DOWN. MAKE CALLS. 8,182.0 8,087.0 8/28/2022 00:00 8/28/2022 01:00 1.00 INTRM2, CASING OWFF P STAND BACK STD #80. MONITOR WELL VIA CLOSED CHOKES - 29 PSI. BLED DN TO 20 PSI. OPEN UP AT THE RCD HEAD AND MONITOR (STATIC) SIMOPS - B/D TD 8,087.0 8,087.0 8/28/2022 01:00 8/28/2022 02:30 1.50 INTRM2, CASING COND T WEIGHT UP PIT #5 FROM 11.2 TO 11.4 PPG. INSUFFICIENT MUD WEIGHT RETURNS TO SURFACE DURING DISPLACEMENT. 8,087.0 8,087.0 8/28/2022 02:30 8/28/2022 04:15 1.75 INTRM2, CASING SMPD P STRIP OUT OF THE HOLE F/ 8,087' MD T/ 7,322' MD. MONITOR DISP VIA PIT 5. MPD KEEPING 70 PSI WHILE PULLING AND 25 PSI WHILE IN THE SLIPS. UP WT - 124K, S/O WT - 86K. 8,087.0 7,322.0 8/28/2022 04:15 8/28/2022 05:30 1.25 INTRM2, CASING OWFF T OBSERVE 40K OVERPULL AT 7,322' MD AND INCORRECT HOLE FILL. ATTEMPT TO WORK BY OBSTRUCTION (UNSUCCESSFUL). RIH F/ 7,322' MD TO 7,425' MD AND OWFF. UP WT - 130K, S/O WT - 73K. 7,322.0 7,425.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 30/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/28/2022 05:30 8/28/2022 08:00 2.50 INTRM2, CASING SMPD P STRIP OUT OF THE HOLE F/ 7,425' MD T/ 6,107' MD. MONITOR DISP VIA PIT 5. MPD KEEPING 70 PSI WHILE PULLING AND 25 PSI WHILE IN THE SLIPS. UP WT - 124K, S/O WT - 86K. 7,425.0 6,107.0 8/28/2022 08:00 8/28/2022 09:30 1.50 INTRM2, CASING COND T OBSERVE DISCREPENCIES IN FLUID DISPLACEMENT. STOP. OWFF. DECISION MADE TO BUILD 227 BBLS OF 11.4 LSND IN PITS. 6,107.0 6,107.0 8/28/2022 09:30 8/28/2022 10:30 1.00 INTRM2, CASING MPDA P REMOVE MPD BEARING AND DRAIN NIPPLE. INSTALL TRIP NIPPLE. 6,107.0 6,107.0 8/28/2022 10:30 8/28/2022 14:00 3.50 INTRM2, CASING TRIP P POOH ON ELEVATORS F/ 6,107' MD TO 4,601' MD. MONITOR DISP VIA TT. UP WT - 97K, S/O WT - 80K. 6,107.0 4,601.0 8/28/2022 14:00 8/28/2022 14:45 0.75 INTRM2, CASING CIRC P PUMP SLUG. SIMOPS - C/O HANDLING EQUIPMENT FROM 5" TO 4". 4,601.0 4,601.0 8/28/2022 14:45 8/28/2022 19:30 4.75 INTRM2, CASING TRIP P POOH ON ELEVATORS F/ 4,601' MD TO TOP OF 4" HWDP @ 620' MD. MONITOR DISP VIA TT. UP WT - 78K 4,601.0 620.0 8/28/2022 19:30 8/28/2022 23:00 3.50 INTRM2, CASING BHAH P OWFF. L/D INTERMEDIATE 2 BHA F/ 620' MD AS PER SLMB DD. MONITOR DISP VIA TT. 620.0 0.0 8/28/2022 23:00 8/29/2022 00:00 1.00 INTRM2, CASING BHAH P CLEAR AND CLEAN RIG FLOOR. SIMOPS - P/U 5" TEST JT AND M/U STACK FLUSHING TOOL. 0.0 0.0 8/29/2022 00:00 8/29/2022 00:30 0.50 INTRM2, CASING WWWH P FLUSH STACK W/ 640 GPM, 55 PSI, 54% F/O. WORK THROUGH 3X. B/D TD. R/D STACK FLUSHING TOOL. 0.0 0.0 8/29/2022 00:30 8/29/2022 01:15 0.75 INTRM2, CASING RURD P MT STACK. PULL WEAR BUSHING. INSTALL UPPER TEST PLUG VIA FMC REP. CLOSE BLIND/SHEER RAMS. LINE UP MPD INJECTION LINE TO THE IA TO MONITOR WELL BORE. MONITOR VIA PILL PIT 2 0.0 0.0 8/29/2022 01:15 8/29/2022 03:30 2.25 INTRM2, CASING BOPE P C/O UPPER VBR'S TO 4½" X 7". CONTINUE TO MONITOR WELL BORE VIA MPD LINE ON PILL PIT 2. 0.0 0.0 8/29/2022 03:30 8/29/2022 05:00 1.50 INTRM2, CASING RURD P P/U 5" TEST JT. FLOOD LINES AND SHELL TEST BOPE (GOOD) 0.0 8/29/2022 05:00 8/29/2022 07:00 2.00 INTRM2, CASING BOPE P WITH THE 7" TEST JT TEST ANNUAR TO 250 PSI LOW 2500 PSI HIGH. TEST UPPER 4½" X 7" TO 250 PSI LOW 3500 PSI HIGH F/ 5/5 CHARTED MIN.(GOOD). WITH 5" TEST JT TEST UPPER VBR'S TO 250 PSI LOW 3500 PSI HIGH F/ 5/5 CHARTED MIN (GOOD) 0.0 0.0 8/29/2022 07:00 8/29/2022 07:30 0.50 INTRM2, CASING RURD P PULL TEST PLUG, INSTALL 9.125 ID WEAR BUSHING PER FMC REP. B/D TEST LINES. 0.0 0.0 8/29/2022 07:30 8/29/2022 09:30 2.00 INTRM2, CASING RURD P MOBILIZE 7" CSG EQUIPMENT TO THE RIG FLOOR. R/U DOYON CSG POWER TONGS, TQ TURN EQUIPEMENT, ELEVATORS, CORRECT XO FOR FOSV, AND FILL UP LINE. 0.0 0.0 8/29/2022 09:30 8/29/2022 10:00 0.50 INTRM2, CASING SFTY P PJSM ON RUNNING 7" LINER W/ CPAI RIG SUPERVISOR, DDI TP, DDI CSG REP, AND RIG CREW. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 31/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/29/2022 10:00 8/29/2022 10:45 0.75 INTRM2, CASING PUTB P M/U AND BAKER LOC DAVIS LYNCH 7" TN-110SS TS BLUE SHOE TRAC TO 130' MD(TO PIN END OF JT 4). TQ TURN TS BLUE CONNECTIONS TO OPTIMUM TQ OF 11,600 FT/LBS. CHECK FLOATS (GOOD) 0.0 130.0 8/29/2022 10:45 8/29/2022 14:00 3.25 INTRM2, CASING PULD P RIH W/ 7" TN-110SS TS BLUE X TXP LINER. TQ TURN TS BLUE CONNECTIONS TO OPTIMUM TQ OF 11,600 FT/LBS F/ 130' MD TO 978' MD. MONITOR DISP VIA PIT 5. 130.0 978.0 8/29/2022 14:00 8/29/2022 14:15 0.25 INTRM2, CASING RURD P R/D DDI CSG TQ TURN RUNNING EQUIPMENT. 978.0 978.0 8/29/2022 14:15 8/29/2022 15:00 0.75 INTRM2, CASING PUTB P RIH W/ 7" TXP F/ 978' MD T/ 1,185' MD. TQ TXP CONNECTIONS TO 14,750 FT/LBS. MONITOR DISP VIA PIT 5. 978.0 1,185.0 8/29/2022 15:00 8/29/2022 15:45 0.75 INTRM2, CASING CIRC P FILL PIPE AND CIRCULATE CSG VOLUMEW/ 65 GPM, 84 PSI, 27% F/O, TOTAL STKS PUMPED - 502 1,185.0 1,185.0 8/29/2022 15:45 8/29/2022 23:30 7.75 INTRM2, CASING PUTB P RIH W/ 7" TXP F/ 1,185' MD T/ 4,237' MD. TQ TXP CONNECTIONS TO 14,750 FT/LBS. MONITOR DISP VIA PIT 5. 1,185.0 4,237.0 8/29/2022 23:30 8/30/2022 00:00 0.50 INTRM2, CASING PUTB P P/U & M/U SLZXP LINER HANGER ASSEMBLY TO HYD563 X TXP XO. ADD XAN PLEX D & RIH F/ 4,237' MD T/ 4,316' MD. TQ HYD563 CONNECTIONS TO 9,400 FT/ LBS. UP WT - 109K, S/O WT - 93K. 4,237.0 4,316.0 8/30/2022 00:00 8/30/2022 01:30 1.50 INTRM2, CASING CIRC P M/U 1ST STD OF 5" DP AND RIH F/ 4,316' MD T/ 4,406' MD. CIRC LINER VOLUME (165 BBLS) STAGE PUMPS UP T/ 6 BPM. ICP @ 84 GPM - 333 W/ 25% F/O. FCP @ 252 GPM 490 W/ 39% F/O. OBTAIN T&D VALUES W/ 85 GPM 288 PSI, 27% F/O - UP WT - 101K, S/O WT - 93K, 20 RPM, 3.5K TQ ROT WT - 97K. W/O PUMPS - UP WT - 110K, S/O WT - 98K, ROT WT - 102K, 20 RPM, 3.5K TQ. TOTAL STKS PUMPED - 2441 4,316.0 4,406.0 8/30/2022 01:30 8/30/2022 09:30 8.00 INTRM2, CASING RUNL P RIH W/ 7" LINER ON 5" DP @ 20 FT/MIN F/ 4,406' MD T/ 8,120' MD. FILL PIPE EVERY 10 STDS. MONITOR DISP VIA PIT 5. DRIFT STANDS OUT OF THE DERRICK WITH 2.75 OD RABBIT. UP WT - 125K, S/O WT - 68K 4,406.0 8,120.0 8/30/2022 09:30 8/30/2022 10:00 0.50 INTRM2, CASING MPDA P PULL TRIP NIPPLE, INSTALL DRAIN NIPPLE AND MPD BEARING. 8,120.0 8,120.0 8/30/2022 10:00 8/30/2022 10:45 0.75 INTRM2, CASING RUNL P RIH W/ 7" LINER ON 5" DP @ 20 FT/MIN F/ 8,120' MD T/ 8,273' MD. FILL PIPE EVERY 10 STDS. MONITOR DISP VIA PIT 5. DRIFT STANDS OUT OF THE DERRICK WITH 2.75 OD RABBIT. UP WT - 125K, S/O WT - 68K 8,120.0 8,273.0 8/30/2022 10:45 8/30/2022 12:00 1.25 INTRM2, CASING DISP P AT 8,273 DISPLACE WELL F/ 11.4 PPG TO 9.2 PPG LSND AS PER BEYOND PUMP SCHEDULE @ 21 GPM, 422 PSI, 14% F/O. TOTAL STKS PUMPED - 598 8,273.0 8,273.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 32/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/30/2022 12:00 8/30/2022 18:30 6.50 INTRM2, CASING DISP P CONT T/ DISPLACE OVER TO 9.2 PPG AS PER BEYOND PUMP SCHEDULE. AT 2700 STKS ROT AND RECIP F/ 8,273' MD T/ 8,249' MD SLOWLY STAGING PUMPS UP TO 5 BPM, 199 GPM, ICP - 645 @ 42 GPM, FCP - 552 @ 199 GPM W/ 35% F/O. ROT 20 RPM, 6K TQ, 102K UP WT - 96K S/O WT. TOTAL STKS PUMPED - 9422 8,273.0 8,273.0 8/30/2022 18:30 8/30/2022 19:00 0.50 INTRM2, CASING RUNL P OBTAIN T&D VALUES. WITH 84 BPM, 381 PSI, 23% F/O, 20 RPM, 6K TQ, 120K UP WT, 80K S/O WT, 103K ROT WT. W/O PUMPS - 20 RPM, 7K TQ, UP WT - 130K, 80K S/O, 103K ROT. 8,273.0 8,273.0 8/30/2022 19:00 8/31/2022 00:00 5.00 INTRM2, CASING RUNL P RIH W/ 7" LINER ON 5" DP @ 20 FT/MIN F/ 8,273' MD T/ 11,300' MD. FILL PIPE EVERY 10 STDS. MONITOR DISP VIA PIT 1. DRIFT STANDS OUT OF THE DERRICK WITH 2.75 OD RABBIT. S/O WT - 75K 8,273.0 11,300.0 8/31/2022 00:00 8/31/2022 00:45 0.75 INTRM2, CASING RUNL P RIH W/ 7" LINER ON 5" DP @ 20 FT/MIN F/ 11,300' MD T/ 11869' MD. FILL PIPE EVERY 10 STDS. MONITOR DISP VIA PIT 1. DRIFT STANDS OUT OF THE DERRICK WITH 2.75 OD RABBIT. 11,300.0 11,869.0 8/31/2022 00:45 8/31/2022 02:15 1.50 INTRM2, CASING RUNL P RIH W/ 7" LINER ON 5" HWDP @ 20 FT/MIN F/ 11,869' MD T/ 12,338' MD. FILL PIPE EVERY 10 STDS. MONITOR DISP VIA PIT 1. DRIFT STANDS OUT OF THE DERRICK WITH 2.75 OD RABBIT. S/O WT - 82K 11,869.0 12,338.0 8/31/2022 02:15 8/31/2022 03:00 0.75 INTRM2, CASING RUNL P CIRC DN @ 2 BPM 587 PSI, 30% F/O, F/ 12,388' MD T/12,432.87' MD. P/U SINGLE AND WASH DN TO 12,478' MD AT SAME RATE. P/U 19' PUP WASH DN AT SAME RATE AND TAG BTM AT 12,478' MD W/ 12K. S/O WT = 93K. 12,338.0 12,478.0 8/31/2022 03:00 8/31/2022 11:00 8.00 INTRM2, CEMENT CIRC P CONDITION MUD FOR CEMENT JOB. ROT & RECIP PIPE F/ 12,476' MD T/ 12,454' MD STAGING PUMPS UP TO 6 BPM. ICP - 475 @ 85 GPM, 27% F/O. 20 RPM, 11K TQ. UP WT - 125K, S/O - 129K, ROT WT - 125K. FCP - 730 @ 250 GPM, 40% F/O. 12,478.0 12,478.0 8/31/2022 11:00 8/31/2022 11:45 0.75 INTRM2, CEMENT RURD P RIG UP BAKER CEMENT SWIVEL AND CEMENTERS. SPACE OUT AND OBTAIN FINAL WEIGHTS. ROT WT 134K 196K P/U 10K TQ. 12,478.0 12,478.0 8/31/2022 11:45 8/31/2022 12:00 0.25 INTRM2, CEMENT SFTY P PJSM WITH ALL HANDS ON CEMENT JOB. PT SURFACE LINES T/ 4500 PSI, CHARTED. PUMP 40 BBL OF MUD PUSH @ 5 BPM, 339 PSI, 36% F/O 20 RPM, 10K TQ 12,478.0 12,478.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 33/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/31/2022 12:00 8/31/2022 14:00 2.00 INTRM2, CEMENT CMNT P DROP BTM PLUG AND CHASE WITH 87.1 BBL OF 13PPG LEAD CEMENT @ 5 BPM, 327 PSI, 34% 20RPM, 10K TQ. PUMP 22 BBL OF 15.8 PPG TAIL CEMENT @ 4 BPM, 105 PSI, 33% F/O 11K TQ @ 20 RPM. DROP BTM PLUG AND CHASE WITH 20 BBL OF H20 VIA CEMENTERS. CHASE WITH RIG PUMPS @ 5 BPM 270 PSI, 35% F/O CATCH PRESSURE @ 65 STKS. FIRST PLUG LANDED @ 1309 STKS. STAGE UP T/ 6 BPM, 938 PSI, 34% F/O 20 RPM, 17K MAX TQ SEEN. SLOW DOWN TO 3BPM 577 PSI, 32% F/O, 0 RPM, 2ND PLUG LAND @ 3191 STKS. PRESSURE UP 500 OVER T/ 1100 PSI. HOLD F/ 5 MIN. BLEED OFF AND CHECK FLOATS. FLOATS HELD. 12,478.0 12,478.0 8/31/2022 14:00 8/31/2022 14:45 0.75 INTRM2, CEMENT THGR P SET ZXP LINER HANGER AND PACKER AS PER BAKER REP. @ 12,473' MD PRESS UP T/ 2700 PSI, SET 3 MIN, PRESS TO 4000 PSI, PAKER SET @ 3500 PSI, SET DOWN 80K. BLEED OFF PRESSURE. P/U 140K AND RELEASE F/ LINER HANGER. 12,478.0 12,478.0 8/31/2022 14:45 8/31/2022 15:00 0.25 INTRM2, CEMENT PRTS P PRESSURE TEST PACKER T/ 1500 PSI F/ 10 MIN. 12,478.0 12,478.0 8/31/2022 15:00 8/31/2022 15:15 0.25 INTRM2, CEMENT THGR P PRESSURE UP 500 PSI, AND P/U 8 FEET TO VERIFY LINER IS FREE, PRESSURE BLED TO 0 PSI NEW DEPTH 8170' MD TOL 12,478.0 8,170.0 8/31/2022 15:15 8/31/2022 15:30 0.25 INTRM2, CEMENT CIRC P CIRCULATE @ 275 GPM, 450 PSI, 42 % F/O TO 778 STKS. 8,170.0 8,170.0 8/31/2022 15:30 8/31/2022 17:00 1.50 INTRM2, CEMENT RURD P RIG DWN BAKER CEMENT SWIVEL AND LD PUP JT AND WORKING SINGLE. F/ 8170' MD T/ 8031' MD. P/U 140K 8,170.0 8,031.0 8/31/2022 17:00 8/31/2022 18:00 1.00 INTRM2, CEMENT CIRC P DROP 2 NERF BALLS AND CIRCULATE @ 500 GPM, 810 PSI, 56% F/O. 5112 STKS PUMPED 8,031.0 8,031.0 8/31/2022 18:00 8/31/2022 18:30 0.50 INTRM2, CEMENT CIRC P B/D TD AND LINE UP PUMP ON BACKSIDE TO FILL HOLE 8,031.0 8,031.0 8/31/2022 18:30 8/31/2022 19:15 0.75 INTRM2, CEMENT TRIP P POOH ON ELEVATOR F/ 8031' MD T/ 7563' MD RACKING BACK 5" HWDP, P/U 123K 8,031.0 7,563.0 8/31/2022 19:15 8/31/2022 20:15 1.00 INTRM2, CEMENT MPDA P PJSM REMOVE DRIP NIPPLE AND MPD BEARING. INSTALL TRIP NIPPLE 7,563.0 7,563.0 8/31/2022 20:15 9/1/2022 00:00 3.75 INTRM2, CEMENT TRIP P CONT POOH ON ELEVATORS W/ 5" DP. F/ 7,563' MD T/ 3,173' MD. MONITORING HOLE FILL VIA PIT#5. P/U WT= 97K 7,563.0 3,173.0 9/1/2022 00:00 9/1/2022 02:00 2.00 INTRM2, CEMENT TRIP P CONT POOH ON ELEVATORS W/ 5" DP. F3,173' to 35' MD. MONITORING HOLE FILL VIA PIT#5. P/U WT= 55K 3,173.0 35.0 9/1/2022 02:00 9/1/2022 02:30 0.50 INTRM2, CEMENT BHAH P L/D HANGER RUNNING TOOL AS PER BAKER REP. ALL RUNNING TOOLS ACCOUNTED FOR. DOG SUB SHEARED HRDE WAS HYDRAULIC RELEASED RS PACKER AQLL SEALS ACCOUNTED FOR. 35.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 34/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/1/2022 02:30 9/1/2022 04:30 2.00 INTRM2, WHDBOP CLEN P CLEAN AND CLEAR RIG FLOOR, R/U WASH TOOL WASH BOPE STACK 0.0 0.0 9/1/2022 04:30 9/1/2022 06:00 1.50 INTRM2, WHDBOP NUND P PJSM CHANGE OUT TOP RAMS TO 3- 1/2" X 6" VBR'S. 0.0 0.0 9/1/2022 06:00 9/1/2022 12:00 6.00 INTRM2, WHDBOP CLEN P PERFORM WEEKLY DERRICK INSPECTION, CLEAN/ORGANIZE ON RIG FLOOR, PREP FOR BOP TEST, BRING UP BHA COMPONENTS TO RIG FLOOR, CLEAN SUCTION MANIFOLDS, SUCTION SCREENS AND DISCHARGE SCREENS ON BOTH MUD PUMPS, C/O ALL CAMLOCK GASKETS FROM WATER BASED TO OBM ON TANK FARM SYSTEM, EMPTY AND CLEAN IN MUD PITS, FLUSH AND CLEAN TANK FARM TANKS. 0.0 0.0 9/1/2022 12:00 9/1/2022 21:00 9.00 INTRM2, WHDBOP CLEN P CONT. TO PERFORM WEEKLY DERRICK INSPECTION, CLEAN/ORGANIZE ON RIG FLOOR, PREP FOR BOP TEST, CLEAN SUCTION MANIFOLDS, SUCTION SCREENS AND DISCHARGE SCREENS ON BOTH MUD PUMPS, EMPTY AND CLEAN IN MUD PITS, FLUSH AND CLEAN TANK FARM TANKS. L/D 6 STANDS OF 5" HWDP VIA MOUSEHOLE. MOTORMAN WENT THROUGH ACCUMULATOR BOTTLES AND RECORDED PRESSURES 0.0 0.0 9/1/2022 21:00 9/1/2022 22:30 1.50 INTRM2, WHDBOP CLEN P CONT. TO CLEAN/ORGANIZE ON RIG FLOOR, PREP FOR BOP TEST, CLEAN SUCTION MANIFOLDS, SUCTION SCREENS AND DISCHARGE SCREENS ON BOTH MUD PUMPS, EMPTY AND CLEAN IN MUD PITS 0.0 0.0 9/1/2022 22:30 9/2/2022 00:00 1.50 INTRM2, WHDBOP SLPC P CUT AND SLIP 42' OF DRILL LINE 0.0 0.0 9/2/2022 00:00 9/2/2022 01:00 1.00 INTRM2, WHDBOP BOPE P FILL LINES AND STACK W/ WATER PURGE AIR FROM LINES AND SHELL TEST GOOD TEST. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 35/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/2/2022 01:00 9/2/2022 04:45 3.75 INTRM2, WHDBOP BOPE P TEST BOPE ALL TESTS T/ 250 LOW 3,500 HIGH FOR 5 CHARTED MIN. W/ EXCEPTION OF MANUAL OPERATED & SUPER CHOKE TESTED T/ 250 LOW & 2,000 PSI FOR 5 CHARTED MIN, W/ 4" TEST JT TEST ANNULAR, 2 7/8" X 5 1/2" UPR, 2 7/8" X 5 1/2" LPR, W/ 4 1/2" TEST JT TEST 2 7/8" X 5 1/2" UPR & 2 7/8" X 5 1/2" LPR, TEST CHOKE VALVES 1-15, MANUAL OPERATED & SUPER CHOKE, CHOKE & KILL MANUALS & HCR'S, 4" VALVE ON KILL LINE, 4" FOSV, 4" DART VALVE, UPPER & LOWER IBOP; BLIND/ SHEAR RAMS; PERFORM KOOMEY DRAWDOWN, ACC = 1800 PSI. MANIF. = 3000 PSI. ACC = 1800 PSI AFTER ALL FUNCTIONS ON BOTTLES, 7 SEC FOR 200 PSI. BUILD W/ 2 ELEC. PUMPS, 57 SEC T/ BUILD FULL SYS. PRESSURE W/ 2 ELEC. & 2 AIR PUMPS, CLOSING TIMES ANNULAR = 23 SEC. UPR = 18 SEC. BLIND / SHEARS = 16 SEC. LPR = 16 SEC. CHOKE HCR = 2 SEC. KILL HCR = 2 SEC; TEST PVT GAIN/LOSS AND FLOW OUT ALARMS, TEST LEL AND H2S ALARMS; AOGCC REP KAM P. ST.JOHN WAIVED WITNESS @ 06:30 HRS on 9/1/22 0.0 0.0 9/2/2022 04:45 9/2/2022 07:00 2.25 INTRM2, WHDBOP PULD P PULL TEST PLUG, SET WEAR RING, R/D TESTING EQUIPMENT, CALIBRATE BLOCKS WEAR RING ID= 9 1/8", B/D TESTING EQUPIMENT/ CHOKE,KILL, AND TOP DRIVE 0.0 0.0 9/2/2022 07:00 9/2/2022 10:00 3.00 INTRM2, DRILLOUT RURD P MAKE UP SECTION PIPE TALLY, C/O HANDLING EQUIPMENT FROM 5" TO 4", SLIPS, ELEVATORS, ST-100 DIE BLOCKS, P/U MASTER BUSHINGS FOR SMALLER BHA, ETC 0.0 0.0 9/2/2022 10:00 9/2/2022 12:00 2.00 INTRM2, DRILLOUT BHAH P HOLD PJSM ON P/U BHA, P/U BHA/ LOAD SOURCE F/ 0' T/ 465.01' PER SLB REP. 0.0 0.0 9/2/2022 12:00 9/2/2022 14:00 2.00 INTRM2, DRILLOUT BHAH P P/U BHA/ LOAD SOURCE F/ 0' T/ 465.01' MD PER SLB REP. S/O WT 59K MONITOR VIA TRIP TANK 0.0 465.0 9/2/2022 14:00 9/2/2022 16:30 2.50 INTRM2, DRILLOUT TRIP P RIH W/ 4" DP F/ PIPE SHED, DRIFTING EACH JOINT ON SKATE WITH 2" DRIFT, F/ 465' MD TO 1503' MD, MONITOR DISPLACEMENT VIA TRIP TANK 465.0 1,503.0 9/2/2022 16:30 9/2/2022 17:00 0.50 INTRM2, DRILLOUT DHEQ P @1503' MD, CHECK ALL SURFACE LINES, PERFORM SHALLOW HOLE TEST PER SLB REP. @ 200 GPM, PSI=1030 , RPM= 30 1,503.0 1,503.0 9/2/2022 17:00 9/3/2022 00:00 7.00 INTRM2, DRILLOUT TRIP P RIH W/ 4" DP F/ PIPE SHED, DRIFTING EACH JOINT ON SKATE WITH 2" DRIFT, F/ 1,503' MD TO 6,515' MD, MONITOR DISPLACEMENT VIA TRIP TANK. P/U WT= 89K, S/O WT= 75K 1,503.0 6,515.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 36/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/3/2022 00:00 9/3/2022 01:00 1.00 INTRM2, DRILLOUT TRIP P RIH W/ 4" DP OUT OF DERRICK F/ 6,515' MD T/ 8,121' MD, MONITORING DISPLACEMENT VIA TRIP TANK. P/U WT= 97K, S/O WT= 77K 6,515.0 8,121.0 9/3/2022 01:00 9/3/2022 01:30 0.50 INTRM2, DRILLOUT TRIP P @ 8,121' MD KELLY UP AND CIRC @ 225 GPM, 1,404 PSI, 35% F/O. VERIFY SONICSCOPE CONFIGURATION W/ SLB DD. 8,121.0 8,121.0 9/3/2022 01:30 9/3/2022 03:45 2.25 INTRM2, DRILLOUT DLOG P RIH W/ 4" DP OUT OF DERRICK F/ 8,121' MD T/ 10,486' MD LOGGING CEMENT. MONITORING DISPLACEMENT VIA TRIP TANK. RUNNING SPEED= 1,700'/HR. P/U WT= XK, S/O WT= XK 8,121.0 10,486.0 9/3/2022 03:45 9/3/2022 04:30 0.75 INTRM2, DRILLOUT RURD P M/U 4"X5" X/O, NC50 FLOAT SUB. C/O 4" HANDLING EQUIPMENT T/ 5" HANDLING EQUIPMENT 10,486.0 10,486.0 9/3/2022 04:30 9/3/2022 07:00 2.50 INTRM2, DRILLOUT DLOG P RIH W/ 5" DP OUT OF DERRICK F/ 10,486' MD T/ 12,092' MD LOGGING CEMENT. MONITORING DISPLACEMENT VIA TRIP TANK. RUNNING SPEED= 1,700'/HR. P/U WT= 84K, S/O WT= 108K 10,486.0 12,092.0 9/3/2022 07:00 9/3/2022 07:30 0.50 INTRM2, DRILLOUT WASH P WASH DOWN F/ 12,092' MD T/ 12,233' MD, 210 GPM, PSI= 1623, F/O %=38, 86K S/O, 124K P/U. 12,092.0 12,233.0 9/3/2022 07:30 9/3/2022 10:00 2.50 INTRM2, DRILLOUT CIRC P TOOK WT @ 12,233' MD (10K), RACKED BACK STD 125, KELLY UP T/ STD 124 AND BEGAN TO CIRCULATE AND CONDITION MUD F/ CASING TEST, ROTATE/RECIP. FULL STD WHILE CIRC. @ 220 GPM, 40 RPM, PSI=1604, 36% F/O, 5K TQ, P/U= 103K, S/O= 107K.(6895 TOT. STRKS) 12,233.0 12,138.0 9/3/2022 10:00 9/3/2022 11:30 1.50 INTRM2, DRILLOUT PRTS P BLOW DOWN TOP DRIVE, RIG UP F/ CASING TEST, PERFORM CASING PRESSURE TEST @ 6 SPM TO 3500 PSI (30 MIN. CHARTED), 114 TOT. STRKS, PUMPED 9.6 BLLS, BLED BACK 9.5BBLS. 12,138.0 12,138.0 9/3/2022 11:30 9/3/2022 12:00 0.50 INTRM2, DRILLOUT RURD P RIG DOWN AND BLOW DOWN TESTING EQUPMENT. 12,138.0 12,138.0 9/3/2022 12:00 9/3/2022 13:00 1.00 INTRM2, DRILLOUT DRLG P WASH DOWN F/ 12,138' MD T/ TAG TOP OF LANDING COLLAR PER DD @ 12,345' MD, 220 GPM, PSI=1635 , 33% F/O, 40RPM, 5K TQ, S/O 108K, P/U 111K 12,138.0 12,345.0 9/3/2022 13:00 9/3/2022 13:45 0.75 INTRM2, DRILLOUT DRLG P DRILL OUT LANDING COLLAR F/ 12,345‘ MD - T/ 12,349.26‘ MD , WOB = 9, GPM = 220, PSI= 1650, RPM = 55, TQ = 9-10K, FLOW OUT = 33%, 12,345.0 12,349.0 9/3/2022 13:45 9/3/2022 16:45 3.00 INTRM2, DRILLOUT DRLG P DRILL CEMENT F/ 12,349.26‘ MD - T/ 12,390‘ MD , WOB= 9, GPM= 250, PSI= 1994, RPM= 120, TQ= 9-10K, FLOW OUT = 32%, 12,349.0 12,390.0 9/3/2022 16:45 9/3/2022 17:00 0.25 INTRM2, DRILLOUT DRLG P DRILL OUT FLOAT COLLAR F/ 12,390.‘ MD - T/ 12,396‘ MD , WOB =8K , GPM =250 , PSI=2029 , RPM =55 , TQ =9 K, FLOW OUT = 34% 12,390.0 12,396.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 37/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/3/2022 17:00 9/3/2022 18:30 1.50 INTRM2, DRILLOUT DRLG P DRILL OUT CEMENT F/ 12,396' MD T/ 12,474' MD, WOB= 3K, 250 GPM, 2,050 PSI, 34% F/O, 9K TQ, 12,396.0 12,474.0 9/3/2022 18:30 9/3/2022 19:30 1.00 INTRM2, DRILLOUT DRLG P DRILL OUT SHOE F/ 12,474' MD T/ 12,479' MD @ 250 GPM, 2,099 PSI, 33% F/O, 100 RPM, 12K TQ, WOB= 1-6K 12,474.0 12,479.0 9/3/2022 19:30 9/3/2022 19:45 0.25 INTRM2, DRILLOUT DRLG P REAM THROUGH SHOE X2 F/ 12,479' MD T/ 12,470 @ 250 GPM, 2,099 PSI, 36% F/O, 100 RPM, 10K TQ. 12,479.0 12,470.0 9/3/2022 19:45 9/3/2022 21:30 1.75 INTRM2, DRILLOUT DRLG P ROT AND RECIP, CIRC B/U F/ 12,470' MD T/ 12,373' MD @ 250 GPM, 2,130 PSI, 36% F/O, 100 RPM, 10K TQ, P/U ROT WT= 103K, S/O ROT WT= 107K. TOTAL STKS PUMPED= 6,870 (587 BBLS) 12,470.0 12,373.0 9/3/2022 21:30 9/3/2022 22:30 1.00 INTRM2, DRILLOUT MPDA P @ 12,470' MD FLOW CHECK (STATIC). REMOVE TRIP NIPPLE, INSTALL MPD BEARING PER BEYOND REP. LINE UP MP#2 ON INJ. LINE, BLEED MP#1 DAMPNER T/ 550 PSI. 12,373.0 12,470.0 9/3/2022 22:30 9/3/2022 22:45 0.25 INTRM2, DRILLOUT DDRL P WASH DOWN F/ 12,470' MD T/ 12,479' MD @ 250 GPM, 2,130 PSI, 36% F/O, 100 RPM, 10K TQ DRILL NEW HOLE F/ 12,479' MD T/ 12,498' MD @ 250 GPM, 2,171 PSI, 39% F/O, 100 RPM, 11K TQ, WOB= 7K, ADT = .18, TOTAL BIT HRS = .18, TOTAL JAR HRS = 44.2 12,470.0 12,498.0 9/3/2022 22:45 9/3/2022 23:00 0.25 INTRM2, DRILLOUT RURD P REAM UP F/ 12,498' MD T/ 12,470' @ 250 GPM, 2,099 PSI, 36% F/O, 100 RPM, 10K TQ. L/D WORKING SINGLE 12,498.0 12,470.0 9/3/2022 23:00 9/4/2022 00:00 1.00 INTRM2, DRILLOUT CIRC P ROT AND RECIP, CIRC B/U F/ 12,470' MD T/ 12,373' MD @ 250 GPM, 2,130 PSI, 39% F/O, 100 RPM, 10K TQ, P/U ROT WT= 103K, S/O ROT WT= 107K. 12,470.0 12,373.0 9/4/2022 00:00 9/4/2022 00:30 0.50 INTRM2, DRILLOUT CIRC P CONT. ROT AND RECIP, CIRC B/U F/ 12,470' MD T/ 12,373' MD @ 250 GPM, 2,130 PSI, 39% F/O, 100 RPM, 10K TQ, P/U ROT WT= 103K, S/O ROT WT= 107K. TOTAL STKS PUMPED= 7,086 (605 BBLS) 12,470.0 12,373.0 9/4/2022 00:30 9/4/2022 01:00 0.50 INTRM2, DRILLOUT RURD P R/U FOR LOT 12,470.0 12,373.0 9/4/2022 01:00 9/4/2022 02:00 1.00 INTRM2, DRILLOUT LOT P @ 12,470' MD, PERFORM XLOT PER CPAI. WAITING ON DATA FROM HOUSTON TO RECORD IN IADC. 12,470.0 12,373.0 9/4/2022 02:00 9/4/2022 02:30 0.50 PROD1, DRILL RURD P R/D TESTING EQUIPMENT 12,373.0 12,373.0 9/4/2022 02:30 9/4/2022 03:00 0.50 PROD1, DRILL WASH P REAM F/ 12,470' MD T/ 12,498' MD X3 CHECKING OPEN HOLE INTEGRITY @ 250 GPM, 2,102 PSI, 43% F/O, 120 RPM, 10K TQ NO ISSUES 12,470.0 12,498.0 9/4/2022 03:00 9/4/2022 05:00 2.00 PROD1, DRILL CIRC P ROT AND RECIP F/ 12,470' MD T/ 12,373' MD @ 250 GPM, 2,085 PSI, 39% F/O, 100 RPM, 10K TQ, P/U ROT WT= 103K, S/O ROT WT= 107K. 12,470.0 12,373.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 38/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/4/2022 05:00 9/4/2022 07:00 2.00 PROD1, DRILL RURD P INCREASE PULSATION DAMPNER PRESSURE T/ 950 PSI ON MP#1, SERVICE TOP DRIVE, PREP FOR DISPLACEMENT T/ OBM IN MUD PITS AND ROCKWASHER, OFFLOAD PIT #5 TO UPRIGHTS, TRAP PRESSURE W/ MPD TO DISPLACE OBM THROUGH BOTH MUD PUMPS 12,373.0 12,373.0 9/4/2022 07:00 9/4/2022 10:00 3.00 PROD1, DRILL RURD P DISPLACE WELL F/ 9.3 PPG LSND T/ 9.0 PPG VERSAPRO OBM. @ 225 GPM, 2650 PSI, 34% F/O, TOTAL STRKS PUMPED = 10,772 SIMOPS- PURGE ALL CENTRIFUGALS WITH OBM 12,373.0 12,470.0 9/4/2022 10:00 9/4/2022 10:30 0.50 PROD1, DRILL CIRC P OBTAIN SPR'S 12,470.0 12,470.0 9/4/2022 10:30 9/4/2022 11:00 0.50 PROD1, DRILL WASH P REAM DOWN F/ 12,469' MD T/ TAG BOTTOM @ 12,498' MD, 240 GPM, 120 RM, ROT. S/O 106K, 36% F/O, 2800 PSI. 12,470.0 12,498.0 9/4/2022 11:00 9/4/2022 12:00 1.00 PROD1, DRILL DDRL P DRILL 6 1/8” PRODUCTION HOLE F/ 12,498‘ MD - T/ 12,565‘ MD 4071‘ TVD, WOB = 5K, GPM = 240 PSI ON = 2929, PSI OFF = 2963, RPM = 120, TQ ON = 7, TQ OFF = 6, FLOW OUT = 41%, 12,498.0 12,565.0 9/4/2022 12:00 9/4/2022 18:00 6.00 PROD1, DRILL DDRL P DRILL 6 1/8” PRODUCTION HOLE F/ 12,565‘ MD - T/ 12914‘ MD 4119‘ TVD, WOB = 2, GPM = 230, PSI ON = 2739, PSI OFF = 2713, RPM = 150, TQ ON = 8K, TQ OFF = 7, FLOW OUT = 41%, ECD = 11.02 PPG, P/U WT = 148K, S/O WT = 65K, RT WT = 106K, MPD CONNECTION BACK PSI = 435 12,565.0 12,914.0 9/4/2022 18:00 9/5/2022 00:00 6.00 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F/ 12,914‘ MD - T/ 13,368‘ MD 4,183‘ TVD, WOB = 10K, GPM = 230, PSI ON = 2,599, PSI OFF = 2,563, RPM = 150, TQ ON = 10K, TQ OFF = 8K, FLOW OUT = 44%, ECD = 11.0 PPG, P/U WT = 160K, S/O WT = N/A, RT WT = 110K, ADT = 8.92, TOTAL BIT HRS = 9.95, TOTAL JAR HRS = 53.97, MPD CONNECTION BACK PSI = 435 12,914.0 13,368.0 9/5/2022 00:00 9/5/2022 06:00 6.00 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F/ 13,368‘ MD TO 13806' MD 4,183‘ TVD, WOB = 10K, GPM = 230, PSI ON = 2,599, PSI OFF = 2,563, RPM = 150, TQ ON = 10K, TQ OFF = 8K, FLOW OUT = 44%, ECD = 11.0 PPG, P/U WT = 160K, S/O WT = N/A, RT WT = 110K, ADT = 14.92, TOTAL BIT HRS = 15.95 TOTAL JAR HRS = 56.97, MPD CONNECTION BACK PSI = 435 13,368.0 13,806.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 39/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/5/2022 06:00 9/5/2022 12:00 6.00 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F/ 13,806‘ MD - T/ 14,181‘ MD 4255‘ TVD, WOB = 5K, GPM = 230, PSI ON = 2633, PSI OFF = 2630, RPM = 150, TQ ON = 8K, TQ OFF = 8K, FLOW OUT = 35%, ECD = 10.98 PPG, P/U WT = 165K, S/O WT = 67K, RT WT = 114K, ADT = 9.41, TOTAL BIT HRS = 19.36, TOTAL JAR HRS = 63.38, MPD CONNECTION BACK PSI = 385 SPR’S @ 13,885’ MD, 4,236’ TVD MW = 9.0 PPG TIME: 07:00 #1 MP – 1BPM – 469/371 PSI 2BPM – 716/224PSI 13,806.0 14,181.0 9/5/2022 12:00 9/5/2022 18:00 6.00 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F/ 14,181‘ MD - T/ 14,641‘ MD 4,258‘ TVD, WOB = 3K, GPM = 230, PSI ON = 2504, PSI OFF = 2490, RPM = 150, TQ ON = 9, TQ OFF = 8, FLOW OUT = 41%, ECD = 10.91 PPG, P/U WT = 171K, S/O WT = N/A, RT WT = 114K, MPD CONNECTION BACK PSI = 385 14,181.0 14,641.0 9/5/2022 18:00 9/6/2022 00:00 6.00 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F/ 14,641‘ MD - T/ 15,114‘ MD 4,259‘ TVD, WOB = 3K, GPM = 230, PSI ON = 2,570, PSI OFF = 2,564, RPM = 150, TQ ON = 9K, TQ OFF = 10K, FLOW OUT = 40%, ECD = 10.94 PPG, P/U WT = 174K, S/O WT = N/A, RT WT = 116K, ADT = 9.09, TOTAL BIT HRS = 28.45, TOTAL JAR HRS = 72.47, MPD CONNECTION BACK PSI = 385 SPR’S @ 14,734’ MD, 4,259’ TVD MW = 9.0PPG TIME: 19:15 #1 MP – 2BPM – 880/178PSI 3BPM – 1,120/134PSI LOSSES FOR TOUR= 173 BBLS LOSSES DEPTHS 13979' AND 14737' 14,641.0 15,114.0 9/6/2022 00:00 9/6/2022 06:00 6.00 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F/ 15,114‘ MD T/ 15586' 4,259‘ TVD, WOB = 3K, GPM = 230, PSI ON = 2,570, PSI OFF = 2,564, RPM = 150, TQ ON = 9K, TQ OFF = 10K, FLOW OUT = 40%, ECD = 10.94 PPG, P/U WT = 174K, S/O WT = N/A, RT WT = 116K, ADT = 9.09, TOTAL BIT HRS = 28.45, TOTAL JAR HRS = 72.47, MPD CONNECTION BACK PSI = 385 15,114.0 15,586.0 9/6/2022 06:00 9/6/2022 10:30 4.50 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F/ 15,586‘ MD - T/ 15,871‘ MD 4273‘ TVD, WOB= 8K, GPM= 230, PSI ON= 2564, PSI OFF= 2552, RPM= 150, TQ ON= 11K, TQ OFF= 10K, FLOW OUT= 35%, ECD= 11.20 PPG, P/U WT=179K, S/O WT= N/A, RT WT= 115K, ADT= 8.45, TOTAL BIT HRS= 36.90, TOTAL JAR HRS= 80.92, MPD CONNECTION BACK PSI= 380 15,586.0 15,871.0 9/6/2022 10:30 9/6/2022 11:00 0.50 PROD1, DRILL SVRG P 30 MINUTE RIG SERVICE 15,871.0 15,871.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 40/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/6/2022 11:00 9/6/2022 14:00 3.00 PROD1, DRILL DDRL T WASH OUT ON SUCTION POT ON # 1 MUD PUMP, SWAPPED PUMP # 2 F/ MPD T/ HOLE, ROT./RECIP. F/ 15,871 T/15,776 @ 230 GPM, 130 RPM, 2516 PSI, 32% F/O, 119K P/U, 105 S/O, WHILE REPAIRING PUMP #1. SPR’S @ 15,584’ MD, 4,264’ TVD MW = 9.1PPG TIME: 06:00 #1 MP – 12SPM – 330/310 PSI 24SPM – 630/230PSI TOUR LOSSES= 102 BBLS 15,871.0 15,871.0 9/6/2022 14:00 9/6/2022 18:00 4.00 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F/ 15,871‘ MD - T/ 16,153‘ MD 4,274‘ TVD, WOB= 8K, GPM= 230, PSI ON= 2717, PSI OFF= 2630, RPM= 150, TQ ON= 12K, TQ OFF= 11K, FLOW OUT= 35%, ECD= 11.31 PPG, P/U WT= 191K, S/O WT= N/AK, RT WT= 115K, MPD CONNECTION BACK PSI= 380 15,871.0 16,153.0 9/6/2022 18:00 9/7/2022 00:00 6.00 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F/ 16,153‘ MD - T/ 16,626‘ MD 4,278‘ TVD, WOB= 3K, GPM= 230, PSI ON= 2,580, PSI OFF= 2,582, RPM= 150, TQ ON= 12K, TQ OFF= 11K, FLOW OUT= 33%, ECD= 11.30 PPG, P/U WT= 190, S/O WT= N/A, RT WT= 115K, ADT= 7.39, TOTAL BIT HRS= 44.29, TOTAL JAR HRS= 88.31, MPD CONNECTION BACK PSI= 385 SPR’S @ 16,153’ MD, 4,274’ TVD MW = 9.0PPG TIME: 18:00 #2 MP – 2BPM – 940/194PSI 3BPM – 1,180/153PSI 16,153.0 16,626.0 9/7/2022 00:00 9/7/2022 06:00 6.00 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F/ 16,626‘ MD TO 17099' 4,278‘ TVD, WOB= 3K, GPM= 230, PSI ON= 2,580, PSI OFF= 2,582, RPM= 150, TQ ON= 12K, TQ OFF= 11K, FLOW OUT= 33%, ECD= 11.30 PPG, P/U WT= 190, S/O WT= N/A, RT WT= 115K, ADT= 7.39, TOTAL BIT HRS= 44.29, TOTAL JAR HRS= 88.31, MPD CONNECTION BACK PSI= 385 60/80 BBLS/HRS LOSSES AT 15964' MD 16,626.0 17,099.0 9/7/2022 06:00 9/7/2022 09:00 3.00 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F/ 17,099‘ MD - T/ 17,221‘ MD 4,303‘ TVD, WOB= 3K, GPM= 230, PSI ON= 2517, PSI OFF= 2626, RPM= 150, TQ ON= 12K, TQ OFF= 11K, FLOW OUT= 32%, ECD= 10.92 PPG, P/U WT= 187K, S/O WT= N/A, RT WT= 114K, ADT= 6.37, TOTAL BIT HRS= 50.66, TOTAL JAR HRS= , MPD CONNECTION BACK PSI= 320 17,099.0 17,221.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 41/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/7/2022 09:00 9/7/2022 13:00 4.00 PROD1, DRILL CIRC T ROTATE/ RECIP. WHILE WAITING ON MUD, F/ 17,221 T/ 17,168, @ 200 GPM, 80 RPM, 32% F/O, 2205 PSI, P/U RWT= 119K, S/O RWT= 114K. SPR’S @ 17,190’ MD, 4295’ TVD MW = 9.0 PPG TIME: 08:00 #1 MP – 2BPM – 950/180 PSI 3BPM – 1200/140PSI TOUR FLUID LOSS - 259 BBLS 17,221.0 17,221.0 9/7/2022 13:00 9/7/2022 18:00 5.00 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F/ 17,221‘ MD - T/ 17,535‘ MD 4,342‘ TVD, WOB= 5 K, GPM= 230, PSI ON= 2710, PSI OFF= 2700, RPM= 125, TQ ON= 11K, TQ OFF= 11K, FLOW OUT= 37%, ECD= 11.02 PPG, P/U WT= 193K, S/O WT= N/A, RT WT= 122K, MPD CONNECTION BACK PSI= 340 17,221.0 17,535.0 9/7/2022 18:00 9/8/2022 00:00 6.00 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F/ 17,535‘ MD - T/ 17,935‘ MD 4,360‘ TVD, WOB= 4K, GPM= 230, PSI ON= 2,504, PSI OFF= 2,442, RPM= 125, TQ ON= 13K, TQ OFF= 13K, FLOW OUT= 31%, ECD= 10.54 PPG, P/U WT= 200K, S/O WT= N/A, RT WT= 125K, ADT= 8.93, TOTAL BIT HRS= 59.59, TOTAL JAR HRS= 103.61, MPD CONNECTION BACK PSI= 320 SPR’S @ 17,568’ MD, 4,348’ TVD MW = 9.0PPG TIME: 18:30 #2 MP – 2BPM – 950/204PSI 3BPM – 1,175/167PSI TOTAL MUD LOSS 24 HRS 913 BBLS 17,535.0 17,935.0 9/8/2022 00:00 9/8/2022 06:00 6.00 PROD1, DRILL DDRL P DRILL 6 ǩ” PRODUCTION HOLE F 17,935‘ MD TO 18350' TD 4,360‘ TVD, WOB= 4K, GPM= 230, PSI ON= 2,504, PSI OFF= 2,442, RPM= 125, TQ ON= 13K, TQ OFF= 13K, FLOW OUT= 31%, ECD= 10.54 PPG, P/U WT= 200K, S/O WT= N/A, RT WT= 125K, ADT= 8.93, TOTAL BIT HRS= 59.59, TOTAL JAR HRS= 103.61, MPD CONNECTION BACK PSI= 320 LOSING MUD ON EACH STAND DRILLING 100 BBLS 17,935.0 18,350.0 9/8/2022 06:00 9/8/2022 07:00 1.00 PROD1, CASING CIRC P OBTAIN SPR'S, SHOOT FINAL SURVEY, @ 18,350’ MD, 4354’ TVD MW = 9.0PPG TIME: 06:30 #1 MP – 2BPM – 720/230 PSI 3BPM – 1000/180 PSI #2 MP – 2BPM – 760/200 PSI 3BPM – 1050/165PSI 17,935.0 18,350.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 42/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/8/2022 07:00 9/8/2022 12:00 5.00 PROD1, CASING CIRC P BROOH WHILE CIRCULATE F/ 18,350' MD T/ 18,040' MD, 1 B/U PER STAND, GPM= 230, PSI= 2549, TQ= 13-17K, F/O 34%, ECD= 10.59 PPG, FINAL P/U= 215K, S/O= N/A, RTW= 120K. MPD CONECTION BACK PSI= 320. PUMPING LCM SWEEPS EACH STAND. TOUR FLUID LOSS- 590 BBLS 17,935.0 18,350.0 9/8/2022 12:00 9/8/2022 18:00 6.00 PROD1, CASING BKRM P CONT. BROOH F/ 18,040‘ MD - T/ 16,910‘ MD, W/ GPM = 230, PSI = 2492, RPM = 110, TQ = 10-12K. F/O = 34%, ECD = 10.41PPG, P/U RT WT = 122K. MPD HOLDING 320 PSI IN SLIPS. MONITORING HOLE FILL VIA PITS #2- 5 17,935.0 18,350.0 9/8/2022 18:00 9/9/2022 00:00 6.00 PROD1, CASING BKRM P CONT. BROOH F/ 16,910‘ MD - T/ 15,250‘ MD, W/ GPM = 230, PSI = 2,409, RPM = 80, TQ = 10-12K. F/O = 37%, ECD = 10.40PPG, P/U RT WT = 122K. MPD HOLDING 320 PSI IN SLIPS. MONITORING HOLE FILL VIA PITS #2- 5 TOTALLY FLUID LOSS= 580 BBLS RECIEVED 400 BBLS AT 20:00HRS 17,935.0 18,350.0 9/9/2022 00:00 9/9/2022 06:00 6.00 PROD1, CASING BKRM P CONT. BROOH F 17935 T/ 13389', W/ GPM = 230, PSI = 2,409, RPM = 80, TQ = 10-12K. F/O = 37%, ECD = 10.40PPG, P/U RT WT = 122K. MPD HOLDING 320 PSI IN SLIPS. MONITORING HOLE FILL VIA PITS #2- 5 17,935.0 13,389.0 9/9/2022 06:00 9/9/2022 08:30 2.50 PROD1, CASING BKRM P CONT. BROOH F/ 13,389‘ MD - T/ 12,740‘ MD, W/ GPM = 230, PSI = 2330, RPM = 80, TQ = 10K. F/O = 33%, ECD = 10.25PPG, P/U RT WT = 118K, MPD HOLDING 320 PSI IN SLIPS, MONITORING HOLE FILL VIA PITS #2- 5 13,389.0 12,470.0 9/9/2022 08:30 9/9/2022 10:00 1.50 PROD1, CASING BKRM P @ 12,740 SLOW PULLING SPEED T/ 200 FPH TO PULL BHA THROUGH SHOE,@ 230 GPM, 80 RPM, 30% F/O, 2282 PSI, 112K P/U RT WT, 10.25 ECD, 8-9K TQ, T/ 12,470' MD.(NO OVERPULL SEEN @ SHOE). 12,470.0 12,374.0 9/9/2022 10:00 9/9/2022 12:00 2.00 PROD1, CASING CIRC P CIRC. B/U WHILE ROTATE/RECIP. F/ 12,470' MD T/12,374' MD, @ 230 GPM, 2290 PSI, 80 RPM, 33% F/O, 8K TQ, ECD= 10.19, P/U RT WT= 112K, S/O RT WT= 103K. (7,133 TOTAL STRKS.) TOUR FLUID LOSS- 41 bbls 12,470.0 12,374.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 43/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/9/2022 12:00 9/9/2022 12:30 0.50 PROD1, CASING OWFF P PERFORM 1 DRAWDOWN WITH MPD, HELD STATIC @ 10 PPG 10 ppg = 222 psi 10.21 ppg = 264 psi DRAWDOWN TIME POSITION PSI VOLUME RETURNED MAN TOTCO 0 OPEN 239 0 25.1 22.1 15 OPEN 222 1.98 BBL 23.4 12,374.0 12,374.0 9/9/2022 12:30 9/9/2022 13:15 0.75 PROD1, CASING CIRC P DROP ACTIVATION BALL FOR WELL COMMANDER AS PER DD (1.75"), PUMP DOWN @ 120 GPM, 900 PSI BALL ON SEAT @ 998 STKS, WELL COMMANDER OPEN @ 2466 PSI W/ 320 PSI ON MPD 12,374.0 12,374.0 9/9/2022 13:15 9/9/2022 17:30 4.25 PROD1, CASING CIRC P CIRCULATE 3X BOTTOMS UP THROUGH WELL COMMANDER, ROT & RECIP F/ 12,470‘ MD - T/ 12,374‘ MD, W/ GPM = 320, PSI = 1826, FLOW OUT = 38%, RPM = 80, TQ = 8K, P/U RT WT = 108K, S/O RT WT = 106K, TOTAL PUMPED 21,338 STKS 12,470.0 12,374.0 9/9/2022 17:30 9/9/2022 18:15 0.75 PROD1, CASING CIRC P DROP 1.75" BALL TO CLOSE WELL COMMANDER @ 120 GPM, 550 PSI, 38% F/O, @ 970 STKS AWAY DROP RATE T/ 84 GPM, 465 PSI, 38% F/O. @ 1,008 STKS OBSERVE PUMP PRESSURE INCREASE T/ 2,708 PSI AND THEN SHEAR OUT. WELL COMMANDER CONFIRMED CLOSED PER SLB DD 12,374.0 12,374.0 9/9/2022 18:15 9/9/2022 19:30 1.25 PROD1, CASING CIRC P ROT AND RECIP F/ 12,470' MD T/ 12,374' MD, @ 230 GPM, 2,200 PSI, 80 RPM, 39% F/O, 8K TQ, ECD= 10.06, P/U RT WT= 112K, S/O RT WT= 103K. (4,856 TOTAL STRKS.) PREP IN MUD PITS FOR DISPLACEMENT 12,470.0 12,374.0 9/9/2022 19:30 9/9/2022 21:00 1.50 PROD1, CASING CIRC P PUMP 80 BBLS 9.5 PPG SPACER, SPOT 500' OF THE SPACER F/ 12,470' MD T/ 12,000' MD @ 5 BPM, 1,993 PSI, 32% F/O, 80 RPM, 8K TQ, ROT WT= 123K 12,470.0 12,000.0 9/9/2022 21:00 9/10/2022 00:00 3.00 PROD1, CASING CIRC P DISPLACE 9.0 PPG VERSAPRO W/ 10.0 PPG VERSACLEAN. ROT AND RECIP F/ 12,000' MD T/ 11,904' MD FOLLOWING MPD PUMPING SCHEDULE. ICP= 2,101, 22% F/O, 80 RPM, 8K TQ, ROT P/U WT= 109K, ROT S/O WT= 106K 12,000.0 11,904.0 9/10/2022 00:00 9/10/2022 03:00 3.00 PROD1, CASING CIRC P DISPLACE 9.0 PPG VERSAPRO W/ 10.0 PPG VERSACLEAN. ROT AND RECIP F/ 12,000' MD T/ 11,904' MD FOLLOWING MPD PUMPING SCHEDULE. ICP= 2,101, 22% F/O, 80 RPM, 8K TQ, ROT P/U WT= 109K, ROT S/O WT= 106K 12,000.0 11,904.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 44/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/10/2022 03:00 9/10/2022 03:30 0.50 PROD1, CASING OWFF P OWFF WELL STATIC B/D TANK FARM LINES, FLUSH MP #1 W/ 10 PPG LINE PUMPS BACK UP. 12,000.0 11,904.0 9/10/2022 03:30 9/10/2022 06:30 3.00 PROD1, CASING STRP P SOOH W/ 5" DP F/ 12000'MD T/ 10461' P/U 133K MONITORING HOLE FILL VIA PITS #6 MPD HOLDING 130 PSI = 10.2 PPG 12,000.0 10,461.0 9/10/2022 06:30 9/10/2022 07:30 1.00 PROD1, CASING STRP P MONITOR WELL FOR FLOW PRIOR TO PULLING MPD BEARING (STATIC), PULL BEARING PER MPD REP 12,000.0 10,461.0 9/10/2022 07:30 9/10/2022 10:00 2.50 PROD1, CASING STRP P FILL TRIP TANK W/ 10.0 PPG OBM FOR TRIP, C/O HANDLING EQUIPMENT AND RE-DRESS SLIPS AND IRON ROUGHNECK FROM 5" TO 4", 12,000.0 10,461.0 9/10/2022 10:00 9/10/2022 11:00 1.00 PROD1, CASING TRIP P ATTEMPT TRIP OUT OF HOLE @ 10,461' MD ON ELEVATORS, (SWAB OBSERVED). DECISION MADE TO PUMP OUT OF HOLE. 12,000.0 10,461.0 9/10/2022 11:00 9/10/2022 12:00 1.00 PROD1, CASING PMPO P PUMP OUT OF HOLE F/ 10,461' MD T/ 9,927' MD, @ 110 GPM, P/U WT= 110K. MONITOR HOLE FILL VIA PIT #6. 12,000.0 10,461.0 9/10/2022 12:00 9/10/2022 13:30 1.50 PROD1, CASING PMPO P CONT. TO PUMP OUT OF HOLE F/ 9,927' MD T/9,643' MD, @ 110 GPM, P/U WT= 110K. MONITOR HOLE FILL VIA PIT #6, ATTEMPT TO PULL ON ELEVATORS, (STILL SWABBING), DECISION MADE TO INSTALL 4" BEARING FOR STRIPPING OUT 10,461.0 9,927.0 9/10/2022 13:30 9/10/2022 14:30 1.00 PROD1, CASING MPDA P PULL TRIP NIPPLE, INSTALL DRIP NIPPLE, INSTALL MPD BEARING PER MPD REP. BDTD 9,927.0 9,927.0 9/10/2022 14:30 9/10/2022 22:45 8.25 PROD1, CASING STRP P SOOH UTILIZING MPD TO MITIGATE SWAB F/ 9,643‘ MD - T/ 558‘ MD (STD#1), W/ 4” DP, RK BK IN DRK, P/U WT = 75K, MPD HOLDING 90 PSI OUT OF SLIPS, 50 PSI IN SLIPS. MONITOR HOLE FILL VIA PIT #6 9,927.0 558.0 9/10/2022 22:45 9/10/2022 23:15 0.50 PROD1, CASING OWFF P FLOW CHECK (STATIC). CLEAN RIG FLOOR 558.0 558.0 9/10/2022 23:15 9/11/2022 00:00 0.75 PROD1, CASING MPDA P REMOVE MPD BEARING, INSTALL TRIP NIPPLE PER BEYOND REP 558.0 558.0 9/11/2022 00:00 9/11/2022 00:30 0.50 PROD1, CASING MPDA P REMOVE MPD BEARING, INSTALL TRIP NIPPLE PER BEYOND REP 558.0 558.0 9/11/2022 00:30 9/11/2022 01:45 1.25 PROD1, CASING RURD P RCD CLAMP LEAKING, PUL RISER AND FIXED LEAK 558.0 558.0 9/11/2022 01:45 9/11/2022 03:00 1.25 PROD1, CASING TRIP P CONT. POOH F/ 558' TO 282' P/U WT 60 MONITORING WELL VIA PIT #6 CHANGE OUT JARS WITH JOINT OF HEAVY WEIGHT DRILL PIPE 558.0 282.0 9/11/2022 03:00 9/11/2022 05:30 2.50 PROD1, CASING BHAH P L/D PRODUCTION BHA FROM 282' TO SURFACE 282.0 0.0 9/11/2022 05:30 9/11/2022 07:00 1.50 PROD1, CASING CLEN P CLEAN AND CLEAR BHA AND TOOLS FROM RIG FLOOR 0.0 0.0 9/11/2022 07:00 9/11/2022 09:15 2.25 COMPZ1, CASING RURD P P/U CASING EQUIPMENT, P/U PUP JTS, CENTRILIZERS, R/U TO RUN 4 1/2" LINER 0.0 0.0 9/11/2022 09:15 9/11/2022 09:30 0.25 COMPZ1, CASING SFTY P HOLD PJSM ON RUNNING 4.5" LINER 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 45/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/11/2022 09:30 9/11/2022 09:45 0.25 COMPZ1, CASING RCST P P/U-RUN 4.5" 12.6# L-80 H563 SHOE 0.0 0.0 9/11/2022 09:45 9/11/2022 11:00 1.25 COMPZ1, CASING RCST P RIH W/ 4.5" 12.5# H563 LINER F/ SURFACE T/268' MD FILLED PIPE AND CHECKED FLOATS 0.0 268.0 9/11/2022 11:00 9/11/2022 12:00 1.00 COMPZ1, CASING RCST P RIH W/ 4.5" 12.5# H563 LINER F/ 268' MD , T/ 775' MD, FILLING PIPE VIA FILL HOSE, MONITORING DISPLACEMENT VIA PIT 6. PU/SO =50K 268.0 775.0 9/11/2022 12:00 9/11/2022 18:00 6.00 COMPZ1, CASING RCST P RIH W/ 4.5" 12.5# L-80 HYD 563 LINER F/ 775' MD , T/ 5140' MD, FILLING PIPE ON THE FLY, TOPPING OFF EVERY 10 JTS. MONITORING DISPLACEMENT VIA PIT 6. M/U TQ F/ HYD563= 3.8K, M/U TQ F/ HYD521= 4.7K 775.0 5,140.0 9/11/2022 18:00 9/11/2022 19:30 1.50 COMPZ1, CASING RCST P RIH W/ 4.5" 12.5# L-80 HYD 563 LINER F/ 5,140' MD , T/ 5,993' MD, FILLING PIPE ON THE FLY, TOPPING OFF EVERY 10 JTS. MONITORING DISPLACEMENT VIA PIT 6. M/U TQ F/ HYD563= 3.8K, M/U TQ F/ HYD521= 4.7K. P/U WT= 80K, S/O WT= 70K 5,140.0 5,993.0 9/11/2022 19:30 9/11/2022 22:00 2.50 COMPZ1, CASING PULD P M/U LINER HANGER AND ZXP PACKER ASSEMBLY PER BAKER HUGHES REP F/ 5,993' MD T/6067' MD 6,067' MD. P/U WT= 81K, S/O WT= 72K 5,993.0 6,067.0 9/11/2022 22:00 9/11/2022 22:30 0.50 COMPZ1, CASING RUNL P RIH W/ 4" DP F/ 6,067' MD T/ 6,175' MD. ESTABLISH CIRCULATION @ 2 BPM, 270 PSI, 30% F/O. OBTAIN T&D PARAMETERS PER BAKER HUGHES REP. 2 BPM- 10 RPM= 2K TQ, 30 RPM= 2K TQ, ROT WT= 77K, P/U WT= 82K, S/O WT= 73K PUMPS OFF- 10 RPM= 2K TQ, 30 RPM= 2K TQ, ROT WT= 77K, P/U WT= 83K, S/O WT= 73K 6,067.0 6,175.0 9/11/2022 22:30 9/12/2022 00:00 1.50 COMPZ1, CASING RUNL P RIH W/ 4" DP F/ 6,175' MD T/ 7,493' MD, MONITORING DISPLACEMENT VIA PIT #6. S/O WT= 73K. FILLING DP ON THE FLY, TOPPING OFF EVERY 5 STDS 6,175.0 7,493.0 9/12/2022 00:00 9/12/2022 02:15 2.25 COMPZ1, CASING RUNL P CONT.RIH W/ 4" DP F/ 7,493' TO 9858' MD , MONITORING DISPLACEMENT VIA PIT #6. S/O WT= 73K. FILLING DP ON THE FLY, TOPPING OFF EVERY 5 STDS 7,493.0 9,858.0 9/12/2022 02:15 9/12/2022 03:00 0.75 COMPZ1, CASING RUNL P RIH W/ 4" HWDP F/ 9,858' MD T/ 10,412' MD (6 STDS), MONITORING DISPLACEMENT VIA PIT #6. S/O WT= 77K. FILLING DP ON THE FLY, TOPPING OFF EVERY 3 STDS 9,858.0 10,412.0 9/12/2022 03:00 9/12/2022 03:45 0.75 COMPZ1, CASING RURD P CHANGE OUT HANDLING EQUIPMENT FOR 5" DP 10,412.0 10,412.0 9/12/2022 03:45 9/12/2022 07:30 3.75 COMPZ1, CASING RUNL P RIH W/ 5" DP F/ 10,412' MD T/ 12395' MD, MONITORING DISPLACEMENT VIA PIT #6. S/O WT= XK. FILLING DP ON THE FLY, TOPPING OFF EVERY 5 STDS. 10,412.0 12,395.0 9/12/2022 07:30 9/12/2022 08:15 0.75 COMPZ1, CASING OWFF P FLOW CHECK (STATIC). REMOVE TRIP NIPPLE, INSTALL MPD BEARING PER BEYOND REP. 12,395.0 12,395.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 46/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/12/2022 08:15 9/12/2022 09:00 0.75 COMPZ1, CASING RUNL P RIH W/ 5" DP F/ 12,395MD T/ 12,470' MD, MONITORING DISPLACEMENT VIA PIT #6. S/O WT= 86K. 12,395.0 12,470.0 9/12/2022 09:00 9/12/2022 16:30 7.50 COMPZ1, CASING CIRC P BEGIN DISPLACEMENT - PUMP 80 BBL 9.5PPG OBM SPACER, CHASED BY 9.0PPG OBM @ 50 GPM, 465 PSI. SLOWED PUMP RATE TO 40 GPM, 491 PSI, (1,860 STKS) DUE TO LOSSES 12,470.0 12,470.0 9/12/2022 16:30 9/12/2022 17:00 0.50 COMPZ1, CASING THGR P OBTAIN T&D PARAMETERS W/ PUMPS OFF - 10 RPM, 6K TQ. 30 RPM, 6K TQ, ROT WT = 116K, P/U WT = 138K, S/O WT = 85K 12,470.0 12,470.0 9/12/2022 17:00 9/13/2022 00:00 7.00 COMPZ1, CASING RUNL P SIH W/ 5" DP - DRIFTING FROM DERRICK W/ 2'' DRIFT, F/ 12,470' MD T/ 16,380' MD, P/U WT= 162K, S/O WT = 70K, MONITOR DISPLACEMENT VIA PIT 4, FILLING EVERY 5 STDS. MPD PRESSURE IN SLIPS = 220 PSI / OUT OF SLIPS = 70 PSI 12,470.0 16,380.0 9/13/2022 00:00 9/13/2022 04:00 4.00 COMPZ1, CASING RUNL P SIH W/ 5" DP - DRIFTING FROM DERRICK W/ 2'' DRIFT, F/ 16380' MD T/ 18340' MD, P/U WT= 162K, S/O WT = 70K, MONITOR DISPLACEMENT VIA PIT 4, FILLING EVERY 5 STDS. MPD PRESSURE IN SLIPS = 220 PSI / OUT OF SLIPS = 70 PSI HANGER IS ON DEPTH 12331'MD 16,380.0 18,340.0 9/13/2022 04:00 9/13/2022 06:30 2.50 COMPZ1, CASING CIRC P CIRCULATE B/U @ 3 BPM @ 864 PSI 9% FLOW OUT SLOW TO 2 BPM 664 SLOW TO 1 BPM 532PSI DUE TO LOSES 18,340.0 18,340.0 9/13/2022 06:30 9/13/2022 09:30 3.00 COMPZ1, CASING CIRC P PUMP 15 BBLS HI-VIS SPACER, SHUT DOWN/DROP 1" BALL, CHASE BALL AT 3.5 BPM, BALL DID NOT SEAT, @3281 STRKS SHUT DOWN AND DROP BALL # 2 (1.5"). @ 3737 TOTAL STROKES FIRST BALL SEATS 18,340.0 18,340.0 9/13/2022 09:30 9/13/2022 10:00 0.50 COMPZ1, CASING THGR P PRESSURE UP TO 2000 PSI AND SET DOWN TO 50K HOOKLOAD PER BAKER REP., PRESSURE UP TO 2500 PSI/HOLD 5 MIN., PRESSURE UP TO 3000 PSI/HOLD 5 MIN., (PACKER SET @ 2700 PSI), PRESSURED UP TO SHEAR BALL SEAT (4941 PSI). 18,340.0 18,340.0 9/13/2022 10:00 9/13/2022 11:00 1.00 COMPZ1, CASING PRTS P P/U ROTATING DOG SUB AND SET LINER TOP PACKER PER BAKER REP / TOL 12,287' MD 12,287.0 12,287.0 9/13/2022 11:00 9/13/2022 12:00 1.00 COMPZ1, CASING PRTS P PRESSURE TEST TOP OF LINER TOP PACKER TO 3500 PSI F/ 10 MIN. (CHARTED ' 12,287.0 12,287.0 9/13/2022 12:00 9/13/2022 14:45 2.75 COMPZ1, WELLPR CIRC P P/U TO PULL RUNNING TOOL OUT OF SPACER PER BAKER REP F 12287'. T/ 12,168' MD, KELLY UP T/ CIRCULATE B/U, 250 GPM, 1040 PSI 12,287.0 12,168.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 47/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/13/2022 14:45 9/13/2022 16:30 1.75 COMPZ1, WELLPR FRZP P R/U TO INJECT OA W/ LVT FOR LOT, PRESSURE UP T/ 800 PSI @ 6SPM (1ST PRESSURE STOP). PUMPED 42 STRKS (3.5 BBLS), SHUT-IN AND MONTIORED PRESSURE. BLED BACK 1.3 BBLS, NOTIFIED TOWN OF RESULTS. PROCEEDED WITH 2ND TEST. PRESSURE UP T/ 880 PSI @ 58 STRKS, SAW PRESSURE DROP/STABALIZE, THEN START TO KLIMBING TO MAX PRESSURE OF 1015 PSI @ 175 STRKS THEN DROP TO 920 PSI BY END OF 245 STRKS (20.75 BBLS W/ 0 BLEED BACK). INJECTED TOTAL OF 23 BBLS W/ RIG. 12,168.0 12,168.0 9/13/2022 16:30 9/13/2022 17:00 0.50 COMPZ1, WELLPR FRZP P SWAP OVER TO LITTLE RED TO FREEZE PROTECT ANNULUS / SIMOPS EMPTY PITS 1-4 IN PREP FOR DISPLACEMENT PUMPED WITH LRS, STAGE RATE UP TO 2 BPM. PUMPED 70 BBLS W/ MAX PRESSURE OF 1082 PSI. SHUT DOWN AND MONITOR W/ PRESSURE STABALIZING AT 945 PSI. PUMPED AN ADDITIONAL 5 BBLS W/ MAX PRESSURE OF 1074 PSI. SHUT DOWN, PRESSURE STABLIZED TO 960 PSI. BLEED OFF OA TO 300 PSI BLEED BACK 8 BBLS. PUMP AN ADDITIONAL 11 BBLS (@ 0.25 BPM) W/ MAX PRESSURE OF 1130 PSI. SHUT DOWN AND MONITOR FOR 20 MIN W/ PRESSURE SLOWLY BLEED TO 1,000 PSI. BLEED BACK OA TO 400 PSI, BLEED BACK 7 BBLS. INJECTED A TOTAL OF 71 BBLS WITH LRS. TOTAL FREEZE PROTECT W/ 102 BBLS OF DIESEL/LVT (W/ 8 BBLS PREVIOUSLY PUMPED). 12,168.0 12,168.0 9/13/2022 17:00 9/13/2022 21:00 4.00 COMPZ1, WELLPR CIRC P DISPLACE WELL F/ 9.0 PPG OBM T/ 9.5 BRINE, PUMP 20 BBLS LVT F/ PILL PIT 1, SWAP ON THE FLY T/ 100 BBLS 11.0 PPG TRANSITION SPACER F/ PIT 5, SWAP T/ 40 BBLS 9.5 PPG CLEANING SPACER F/ PIT 6, SWAP T/ 35 BBLS 9.5 PPG HI-VIS SPACER F/ PIT 7, CHASED BY 9.5 PPG BRINE, @ 210 GPM, 651 PSI, 33% F/O. TOTAL STKS PUMPED= 11,339 (968 BBLS 12,168.0 12,168.0 9/13/2022 21:00 9/13/2022 21:45 0.75 COMPZ1, WELLPR OWFF P OWFF (STATIC 12,168.0 12,168.0 9/13/2022 21:45 9/13/2022 22:45 1.00 COMPZ1, WELLPR MPDA P REMOVE MPD BEARING, INSTALL TRIP NIPPLE PER BEYOND REP 12,168.0 12,168.0 9/13/2022 22:45 9/13/2022 23:30 0.75 COMPZ1, WELLPR CLEN P B/D TOP DRIVE, CLEAN AND CLEAR RIG FLOOR 12,168.0 12,168.0 9/13/2022 23:30 9/14/2022 00:00 0.50 COMPZ1, WELLPR TRIP P POOH SIDEWAYS W/ 5" DP F/ 12,168' MD T/ 11,937' MD L/D PIPE IN SHED. MONITORING HOLE FILL VIA TRIP TANK. P/U WT= 164K 12,168.0 11,937.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 48/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/14/2022 00:00 9/14/2022 06:00 6.00 COMPZ1, WELLPR TRIP P TOOH LAYING DOWN 5" DP F/ 11,937' TO 9111' MD L/D PIPE IN SHED. MONITORING HOLE FILL VIA TRIP TANK. P/U WT= 145K 11,937.0 9,111.0 9/14/2022 06:00 9/14/2022 09:00 3.00 COMPZ1, WELLPR TRIP P CONT. POOH SIDEWAYS W/ 5" DP F/ 9,111' MD T/4,342 ' MD L/D PIPE IN SHED. MONITORING HOLE FILL VIA TRIP TANK. P/U WT= 93K. 9,111.0 4,342.0 9/14/2022 09:00 9/14/2022 09:30 0.50 COMPZ1, WELLPR RURD P C/O HANDLING EQUIPMENT FROM 5" T/ 4". 4,342.0 4,342.0 9/14/2022 09:30 9/14/2022 12:00 2.50 COMPZ1, WELLPR TRIP P CONT. POOH SIDEWAYS W/ 4" DP F/ 4,342' MD T/ 3,209' MD L/D PIPE IN SHED. MONITORING HOLE FILL VIA TRIP TANK 4,342.0 3,209.0 9/14/2022 12:00 9/14/2022 15:00 3.00 COMPZ1, WELLPR TRIP P CONT. POOH SIDEWAYS W/ 4" DP F/ 3,209' MD T/ SURFACE, L/D PIPE IN SHED. MONITORING HOLE FILL VIA TRIP TANK 3,209.0 0.0 9/14/2022 15:00 9/14/2022 15:45 0.75 COMPZ1, WELLPR BHAH P L/D LINER RUNNING TOOL PER BAKER REP 0.0 0.0 9/14/2022 15:45 9/14/2022 16:00 0.25 COMPZ1, WELLPR OWFF P OWFF (STATIC). 0.0 0.0 9/14/2022 16:00 9/14/2022 16:30 0.50 COMPZ1, WELLPR CLEN P CLEAN/CLEAR FLOOR, M/U UP STACK WASHER T/ RUN STANDS OUT OF DERRICK IN THE HOLE 0.0 0.0 9/14/2022 16:30 9/14/2022 18:45 2.25 COMPZ1, WELLPR TRIP P RIH W/ 4" DP F/ DERRICK T/ 6,187'MD, MONITORING DISPLACEMENT VIA TRIP TANK 0.0 6,187.0 9/14/2022 18:45 9/15/2022 00:00 5.25 COMPZ1, WELLPR TRIP P POOH SIDEWAYS W/ 4" DP F/ 6,187' MD T/ 600', L/D PIPE IN SHED. MONITORING HOLE FILL VIA TRIP TANK. P/U WT= 50K 6,187.0 600.0 9/15/2022 00:00 9/15/2022 01:00 1.00 COMPZ1, WELLPR TRIP P POOH SIDEWAYS W/ 4" DP F/ 600' MD T/ SURFACE ', L/D PIPE IN SHED. MONITORING HOLE FILL VIA TRIP TANK. P/U WT= 50K 600.0 0.0 9/15/2022 01:00 9/15/2022 01:30 0.50 COMPZ1, RPCOMP WWWH P WASH BOP STACK AS PER FMC REP 0.0 0.0 9/15/2022 01:30 9/15/2022 02:00 0.50 COMPZ1, RPCOMP WWSP P PULL WEAR RING PER FMC REP 0.0 0.0 9/15/2022 02:00 9/15/2022 02:45 0.75 COMPZ1, RPCOMP WWWH P WASH WELL HEAD AS PER FMC REP WHILE CLEANING RIG FLOOR 0.0 0.0 9/15/2022 02:45 9/15/2022 05:00 2.25 COMPZ1, RPCOMP RURD P PJSM R/U UPPER COMPLETION HANDLING TOOLS AND SLB COMMUNICATION CABLE, HANG SHEAVE IN DERRICK PJSM TO RUN UPPER COMPLETION W/ BAKER, DOYON, SLB, ,CPAI 0.0 0.0 9/15/2022 05:00 9/15/2022 05:30 0.50 COMPZ1, RPCOMP PUTB P M/U MULE SHOE, PREMIER PACKER F/ SURFACE T/ 153' MD, S/O WT= 45K 0.0 153.0 9/15/2022 05:30 9/15/2022 06:30 1.00 COMPZ1, RPCOMP PUTB P P/U DHG + MANDREL AND NOTICE IT WAS INSTALLED UPSIDE DOWN. ORIENT THE MANDREL IN CORRECT POSITION 153.0 153.0 9/15/2022 06:30 9/15/2022 07:30 1.00 COMPZ1, RPCOMP PUTB P M/U MANDREL, GLM AND SLIDING SLEEVE F/ 153' MD T/ 314' MD, S/O WT= 46K 153.0 314.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 49/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/15/2022 07:30 9/15/2022 12:00 4.50 COMPZ1, RPCOMP PUTB P RIH W/ 4 1/2" 12.6# L-80 HYD 563 TBG F/ 314' MD T/ 3,893' MD. MONITORING DISPLACEMENT VIA TRIP TANK. INSTALLING CANNON CLAMP EACH CONNECTION. HYD 521 M/U TQ= 4.7K, HYD 563 M/U TQ= 3.8K. S/O WT= 74K 314.0 3,893.0 9/15/2022 12:00 9/15/2022 18:00 6.00 COMPZ1, RPCOMP PUTB P RIH W/ 4 1/2" 12.6# L-80 HYD 563 TBG F/ 3,893' MD T/ 8194' MD. MONITORING DISPLACEMENT VIA TRIP TANK. INSTALLING CANNON CLAMP EACH CONNECTION. HYD 521 M/U TQ= 4.7K, HYD 563 M/U TQ= 3.8K. S/O WT= 70K SIMOPS BLEED OA PRESSURE F/ 600 PSI T/ 250 PSI = 3BBL 3,893.0 8,194.0 9/15/2022 18:00 9/15/2022 22:00 4.00 COMPZ1, RPCOMP PUTB P RIH W/ 4 1/2" 12.6# L-80 HYD 563 TBG F/ 8194' MD T/ 12,300' MD. MONITORING DISPLACEMENT VIA TRIP TANK. INSTALLING CANNON CLAMP EACH CONNECTION. HYD 521 M/U TQ= 4.7K, HYD 563 M/U TQ= 3.8K. P/U WT = 106K, S/O WT = 69K 8,194.0 12,300.0 9/15/2022 22:00 9/15/2022 23:00 1.00 COMPZ1, RPCOMP THGR P TAG NO-GO @ 12,300'. P/U TO BREAK OVER, SLACK OFF AND SET DOWN 10K CONFIRM DEPTH, P/U 5' OF FREE TRAVEL, S/O AND TAG, SET DOWN 15K TO SHEAR LOCATOR PIN, POOH T/12,180', P/U 106K, L/D JT #301, 300, 299 AND STRAP IN SHED TO FIGURE SPACE OUT AS PER CO-MAN 12,300.0 12,300.0 9/15/2022 23:00 9/15/2022 23:30 0.50 COMPZ1, RPCOMP PUTB P RIH W/ SPACE OUT PUPS, F/12,180' T/12,260', SOW=69K, "PUP LENGTHS" 9.73', 9.78', 9.76', 7.28' & JT #299 12,180.0 12,260.0 9/15/2022 23:30 9/16/2022 00:00 0.50 COMPZ1, RPCOMP THGR P M/U LINER HANGER & LANDING JT AS PER FMC REP 12,260.0 12,260.0 9/16/2022 00:00 9/16/2022 01:00 1.00 COMPZ1, RPCOMP THGR P MAKE UP CONTROL LINE TO TBG HANGER AS PER FMC REP. TEST TO 5000 PSI FOR 10 MIN COP REP WITNESSED. RIH AND LAND OUT HANGER @ 12298' RUN IN LOCK DOWN PINS FINAL CLAMP COUNT 306 CROSS COUPLINGS 2 MID JOINT 12,260.0 12,298.0 9/16/2022 01:00 9/16/2022 03:00 2.00 COMPZ1, RPCOMP PRTS P FILL STACK AND SURFACE LINES, SHUT UPPER RAMS TEST TUBING HANGER SEALS VIA KILL LINE 250 PSI 5 MIN 4000 PSI 10 MIN CHARTED AS PER CO MAN, MONITOR OA PRESSURE AT ALL TIMES 12,298.0 12,298.0 9/16/2022 03:00 9/16/2022 05:00 2.00 COMPZ1, RPCOMP PRTS P RIG UP HEAD PIN AND CEMENT HOSE TO PT TUBING, FILL ALL SURFACE LINES AND PT, PRESSURE TEST TUBING TO 3500PSI, 30 MIN "CHARTED" BLEED TUBING TO 3000PSI 12,298.0 12,298.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 50/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/16/2022 05:00 9/16/2022 05:45 0.75 COMPZ1, RPCOMP PRTS P FIOOD INJECTION LINE, PT IA/TUBING HANGER, 3850PSI, 30 "CHARTED" BLEED OF OA PRESSURE AS NEEDED, BLEED TUBING BACK DOWN TO 3000PSI TO ENSURE GOOD TEST ON IA 12,298.0 12,298.0 9/16/2022 05:45 9/16/2022 06:00 0.25 COMPZ1, RPCOMP WWSP P BLEED TUBING PRESSURE TO 0PSI TO SHEAR THE SOV, BOTH TUBING AND IA @ 0 PSI 12,298.0 12,298.0 9/16/2022 06:00 9/16/2022 06:30 0.50 COMPZ1, RPCOMP CIRC P LINE UP TO REVERSE CIRC. PUMP @ 1BPM, 78 PSI, 12% F/O. 69 STKS PUMPED 12,298.0 12,298.0 9/16/2022 06:30 9/16/2022 07:00 0.50 COMPZ1, RPCOMP RURD P R/D DDI CSG EQUIPMENT. L/D CSG TONGS, ELEVATORS DWN BEAVER SLIDE. SIMOPS MONITOR WELL FOR FLOW F/ 30 MIN. 12,298.0 12,298.0 9/16/2022 07:00 9/16/2022 07:45 0.75 COMPZ1, RPCOMP RURD P R/D AND L/D LANDING JT AS PER FMC REP, B/D CEMENT HOSE. 12,298.0 12,298.0 9/16/2022 07:45 9/16/2022 08:30 0.75 COMPZ1, RPCOMP PRTS P INSTALL BPV AND TEST T/ 2500 PSI F/ 10 MIN CHARTED. 66 STKS PUMPED 12,298.0 12,298.0 9/16/2022 08:30 9/16/2022 10:30 2.00 COMPZ1, RPCOMP CLEN P REMOVE CONTROL LINE SPOOL FROM RIG FLOOR. CLEAN AND CLEAR RIG FLOOR. SIMOPS SUCK STACK OUT VIA RIG VAC. B/D MPD AND INJ LINES, CHOKE/KILL. OFFLOAD FLIUD IN PITS TO VAC TRUCKS 12,298.0 12,298.0 9/16/2022 10:30 9/16/2022 12:00 1.50 COMPZ1, WHDBOP NUND P NIPPLE DWN MPD RCD HEAD, AIR VALVE AND 2" HOSES 12,298.0 12,298.0 9/16/2022 12:00 9/16/2022 14:45 2.75 COMPZ1, WHDBOP NUND P REMOVE CHOKE AND KILL LINE. BREAK STACK, BOTH SPACER SPOOLS AND RACK BACK. STACK 12,298.0 12,298.0 9/16/2022 14:45 9/16/2022 15:15 0.50 COMPZ1, WHDBOP NUND P REMOVE BOTH SPACER SPOOLS 12,298.0 12,298.0 9/16/2022 15:15 9/16/2022 17:15 2.00 COMPZ1, WHDBOP WWSP P TERMINATE CONTROL LINE AS PER SLMB REP. SIMOPS PREP TREE ADAPTER FLANGE 12,298.0 12,298.0 9/16/2022 17:15 9/16/2022 18:00 0.75 COMPZ1, WHDBOP NUND P PREP CELLAR FOR TREE INSTALL AS PER FMC REP 12,298.0 12,298.0 9/16/2022 18:00 9/16/2022 21:30 3.50 COMPZ1, WHDBOP NUND P INSTALL TREE AS PER FMC REP, ORIENT AS PER PAD OPERATOR , TORQ ALL BOLTS TO SPEC, SIM-OPS CON'T CLEANING OBM IN MUD PITS, PREP FOR TESTNG OF TREE 12,298.0 12,298.0 9/16/2022 21:30 9/16/2022 22:00 0.50 COMPZ1, WHDBOP PRTS P FMC REP TEST VOID ON TREE, 5OOO PSI, 10 MIN WITNESS BY COP REP AND COP COMPLETION ENG. 12,298.0 12,298.0 9/16/2022 22:00 9/16/2022 23:30 1.50 COMPZ1, WHDBOP FRZP P RIG UP LINES AND MANIFOLD FOR FREEZE PROTECT/ U-TUBE, FILL TREE W/DIESEL 12,298.0 12,298.0 9/16/2022 23:30 9/17/2022 00:00 0.50 COMPZ1, WHDBOP RURD P FILL LINES W/ DIESEL TO GET READY FOR PRESSURE TEST 12,298.0 12,298.0 9/17/2022 00:00 9/17/2022 03:00 3.00 COMPZ1, WHDBOP PRTS P TEST PRODUCTION TREE TO 250 PSI LOWQ AND 5000 PSI HIGH 15 MIN ON CHART 0.0 0.0 9/17/2022 03:00 9/17/2022 04:30 1.50 COMPZ1, WHDBOP WWSP P REMOVE DART AND BPV AS PER FMC HAND REP. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 9/18/2022 Page 51/51 CD4-597 Report Printed: 9/26/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/17/2022 04:30 9/17/2022 06:00 1.50 COMPZ1, WHDBOP RURD P CLEANING OF MUD PITS, CELLAR AND BOP DECK, WAITING ON LRS FOR FREEZE PROTECT 0.0 0.0 9/17/2022 06:00 9/17/2022 08:00 2.00 COMPZ1, WHDBOP RURD P CONT. WAITING ON LRS, GATHER CPAI X/O'S, AND PREP FOR SENDING OUT. 0.0 0.0 9/17/2022 08:00 9/17/2022 09:45 1.75 COMPZ1, WHDBOP FRZP P RIG UP LRS, PT LINES AND PUMP 110 BBL OF DIESEL DOWN IA TAKING RETURNS UP TUBING 825 PSI, 2 BPM. FINAL SHUT IN PRESS. 550 PSI, SHUT IN AND EQUALIZE IA AND TUBING (U-TUBE) 0.0 0.0 9/17/2022 09:45 9/17/2022 12:00 2.25 COMPZ1, WHDBOP OWFF P SHUT IN, EQUALIZE IA AND TUBING (U-TUBE), SIMOPS CLEAN PITS WITH DEEP CLEAN. OFFLOAD FLUID IN PITS. CONT. GATHERING CPAI X/O'S AND PREP TO SEND OUT. PRESSURE WASH DERRICK WINDWALLS 0.0 0.0 9/17/2022 12:00 9/17/2022 14:30 2.50 COMPZ1, WHDBOP OWFF P CONT. ALLOWING WELL TO U-TUBE. PRESSURE STABILIZED AT 200 PSI. BLED PRESSURE TO ZERO .5 BBL TO BLEED OFF TANK. REMOVE TOP DRIVE LINK ADAPTERS AND SEND TO SHOP FOR REPAIR. REMOVE HERCULITE FROM TANK FARM AREA AND ROLL UP. CONT. FLUSHING PITS WITH DEEP CLEAN. SERVICE TOP DRIVE TRACTION MOTORS. PRESSURE WASH DERRICK WINDWALLS. PERFORM MP2'S ON DRAWWORKS. PRESSURE WASH DERRICK WINDWALLS. PERFORM MP2'S ON DRAWWORKS 0.0 0.0 9/17/2022 14:30 9/17/2022 16:00 1.50 COMPZ1, WHDBOP WWSP P B/D & R/D FREEZE PRO. EQUIPMENT. INSTALL BPV AND TREE CAP W/ GAUGE AS PER FMC REP. 0.0 0.0 9/17/2022 16:00 9/17/2022 18:00 2.00 DEMOB, MOVE DMOB P PRESSURE WASH DERRICK WINDWALLS, CONT. CLEANING PITS WITH DEEP CLEAN PILL. INSTALL IA FLANGE, AND RIG DOWN OA MANIFOLD. HOUSEKEEPING IN CELLAR. 0.0 0.0 9/17/2022 18:00 9/18/2022 00:00 6.00 DEMOB, MOVE DMOB P CON'T W/ CLEANING OF WIND WALLS AND DERRICK, CON'T FLUSHING LINES AND CLEANING PITS, ASSIST MAG-TECH WITH RIGGING DOWN, PREP 5" DERRICK FINGERS FOR INSPECTION RIG RELEASED @ 0000 HRS 0.0 0.0 Rig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age 1/1 CD4-597 Report Printed: 9/26/2022 Cement Cement Details Description Conductor String Cement Cementing Start Date 2/4/2022 22:00 Cementing End Date 2/4/2022 04:30 Wellbore Name CD4-597 Comment Cement Stages Stage # 1 Description Conductor String Cement Objective Top Depth (ftKB) 39.1 Bottom Depth (ftKB) 120.0 Full Return? No Vol Cement …Top Plug? No Btm Plug? No Q Pump Init (bbl/m… Q Pump Final (bbl/… Q Pump Avg (bbl/…P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Primary Cement Fluid Description Estimated Top (ftKB) 39.1 Est Btm (ftKB) 120.0 Amount (sacks) Class Volume Pumped (bbl) 48.1 Yield (ft³/sack) 1.16 Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) 16.00 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Conductor String Cement Page 1/1 CD4-597 Report Printed: 9/26/2022 Cement Cement Details Description Surface String Cement Cementing Start Date 8/5/2022 02:45 Cementing End Date 8/5/2022 07:30 Wellbore Name CD4-597 Comment CEMENTERS PUMP 99.5 BBLS 10.7# MUD PUSH II, DROP BOTTOM PLUG. PUMP 447 BBLS 11# LEAD CEMENT FOLLOWED BY 73 BBLS 15.8# TAIL CEMENT, DROP TOP PLUG. PUMP 10 BBLS FRESH WATER. SWAP OVER TO RIG PUMP AND CHASE PLUG @ 7 BPM, 515 PSI, 54% F/O. @ 3100 STKS AWAY SLOW PUMPS T/ 3 BPM, 386 PSI, 45% F/O. BUMP PLUG @ 3232 STKS. HOLD 890 PSI FOR 5 MIN, BLEED OFF AND CHECK FLOATS (GOOD). CIP @ 07:30, 201 BBLS CEMENT TO SURFACE Cement Stages Stage # 1 Description Surface String Cement Objective Top Depth (ftKB) 39.1 Bottom Depth (ftKB) 2,716.4 Full Return? Yes Vol Cement … 201.0 Top Plug? Yes Btm Plug? No Q Pump Init (bbl/m… 341 Q Pump Final (bbl/… 386 Q Pump Avg (bbl/… 5 P Pump Final (psi) 386.0 P Plug Bump (psi) 890.0 Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment R/U cementers and PJSM on cement job. SLB pump 5 bbls H2O and PT lines 3,500 psi. (good). Pump 100 bbls 10.7 ppg mud push II. Shut down and drop bottom plug. Pump 447 bbls 11 ppg 1266 stks 1.91 yield lead cement, Followed by 73 bbl 15.8 ppg 330 stks 1.16 yield tail cement,pump 20 bbls freshwater, shut down drop top plug, displace with rig pumps 331 bbls @ 5bpm 342 psi Full returns all job. bump plug 500psi over circ rate held for 5 min. bleed off check floats floats held CIP 07:30 hrs (201 bbls cement to surface) Cement Fluids & Additives Fluid Fluid Type Lead Cement Fluid Description Estimated Top (ftKB) 39.1 Est Btm (ftKB) 2,221.0 Amount (sacks) 1,314 Class Blend Volume Pumped (bbl) 447.0 Yield (ft³/sack) 1.91 Mix H20 Ratio (gal/sack) 6.67 Free Water (%) Density (lb/gal) 11.00 Plastic Viscosity (cP) 218.0 Thickening Time (hr) 6.00 CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Fluid Fluid Type Tail Cement Fluid Description Estimated Top (ftKB) 2,221.0 Est Btm (ftKB) 2,716.4 Amount (sacks) 350 Class G Volume Pumped (bbl) 73.0 Yield (ft³/sack) 1.17 Mix H20 Ratio (gal/sack) 5.03 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) 151.0 Thickening Time (hr) 5.01 CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Surface String Cement Page 1/1 CD4-597 Report Printed: 9/26/2022 Cement Cement Details Description Cement Squeeze Cementing Start Date 8/9/2022 17:00 Cementing End Date 8/9/2022 22:30 Wellbore Name CD4-597 Comment HOLD PJSM, CEMENTERS PUMP 25.7 BBLS 12.5 PPG MUDPUSH II, FOLLOWED BY 52.5 BBLS 15.6 PPG TAIL CEMENT, FOLLOWED BY 4.5 BBLS 12.5 MUDPUSH II. SWAP OVER TO RIG PUMP AND CHASE W/ 11.0 PPG LSND @ 6 BPM, 68 PSI, 31% F/O, 20 RPM, 2.4K TQ. @ 318 STKS AWAY SLOW PUMPS TO 3 BPM, 26 PSI, 30% F/O, 20 RPM, 2.4K TQ. PUMPS OFF @ 361 STKS AWAY. PERFORM CEMENT SQUEEZE. SHUT IN UPPER PIPE RAMS, PRESSURE UP TO 200 PSI, AFTER 2 HOURS OBSERVE BLEED OFF TO 116 PSI. BLEED OFF ALL PRESSURE AND LEAVE WELL SHUT IN. PUMPED 11 STKS (1.3 BBLS), BLED 1 BBL BACK TO MUD PITS Cement Stages Stage # 1 Description Squeeze – Formation Squeeze Objective Top Depth (ftKB) 2,406.0 Bottom Depth (ftKB) 2,741.0 Full Return? No Vol Cement … 0.0 Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 231 Q Pump Final (bbl/… 231 Q Pump Avg (bbl/…P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) 2,390.0 Tag Method Drill Bit Depth Plug Drilled Out To (ftKB) 2,741.0 Drill Out Diameter (in) 12 1/4 Comment HOLD PJSM, CEMENTERS PUMP 25.7 BBLS 12.5 PPG MUDPUSH II, FOLLOWED BY 52.5 BBLS 15.6 PPG TAIL CEMENT, FOLLOWED BY 4.5 BBLS 12.5 MUDPUSH II. SWAP OVER TO RIG PUMP AND CHASE W/ 11.0 PPG LSND @ 6 BPM, 68 PSI, 31% F/O, 20 RPM, 2.4K TQ. @ 318 STKS AWAY SLOW PUMPS TO 3 BPM, 26 PSI, 30% F/O, 20 RPM, 2.4K TQ. PUMPS OFF @ 361 STKS AWAY. PERFORM CEMENT SQUEEZE. SHUT IN UPPER PIPE RAMS, PRESSURE UP TO 200 PSI, AFTER 2 HOURS OBSERVE BLEED OFF TO 116 PSI. BLEED OFF ALL PRESSURE AND LEAVE WELL SHUT IN. PUMPED 11 STKS (1.3 BBLS), BLED 1 BBL BACK TO MUD PITS Cement Fluids & Additives Fluid Fluid Type Tail Cement Fluid Description Estimated Top (ftKB) 2,406.0 Est Btm (ftKB) 2,741.0 Amount (sacks) 246 Class G Volume Pumped (bbl) 52.5 Yield (ft³/sack) 1.20 Mix H20 Ratio (gal/sack) 5.11 Free Water (%) Density (lb/gal) 15.60 Plastic Viscosity (cP) 57.0 Thickening Time (hr) 5.00 CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Cement Squeeze Page 1/1 CD4-597 Report Printed: 9/26/2022 Cement Cement Details Description Intermediate String 1 Cement Cementing Start Date 8/19/2022 06:00 Cementing End Date 8/19/2022 09:45 Wellbore Name CD4-597 Comment HOLD PJSM, CEMENTERS PUMP 63 BBLS 13 PPG MUDPUSH II, DROP BTM PLUG. CHASE WITH 141 BBLS 15.8 PPG CEMENT. DROP TOP PLUG. KICK OUT WITH 20 BBLS WATER. SWAP TO RIG PUMPS. DISPLACE W/ TREATED LSND 11.0 PPG. BUMP PLUG AT 5097 STKS. PRESSURE UP 500 PSI OVER FCP(900PSI) HOLD FOR 5 MIN. BLEED OFF TO CHECK FLOATS (GOOD). CIP @ 09:45. Cement Stages Stage # 1 Description Intermediate String 1 Cement Objective Top Depth (ftKB) 6,610.0 Bottom Depth (ftKB) 8,324.0 Full Return? Yes Vol Cement … 0.0 Top Plug? Yes Btm Plug? Yes Q Pump Init (bbl/m… 4 Q Pump Final (bbl/… 3 Q Pump Avg (bbl/… 6 P Pump Final (psi) 450.0 P Plug Bump (psi) 380.0 Recip? Yes Stroke (ft) 20.00 Rotated? Yes Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment HOLD PJSM, CEMENTERS PUMP 63 BBLS 13 PPG MUDPUSH II, DROP BTM PLUG. CHASE WITH 141 BBLS 15.8 PPG CEMENT. DROP TOP PLUG. KICK OUT WITH 20 BBLS WATER. SWAP TO RIG PUMPS. DISPLACE W/ TREATED LSND 11.0 PPG. BUMP PLUG AT 5097 STKS. PRESSURE UP 500 PSI OVER FCP(900PSI) HOLD FOR 5 MIN. BLEED OFF TO CHECK FLOATS (GOOD). CIP @ 09:45. Cement Fluids & Additives Fluid Fluid Type Intermediate Cement Fluid Description Estimated Top (ftKB) 6,610.0 Est Btm (ftKB) 8,324.0 Amount (sacks) 685 Class G Volume Pumped (bbl) 141.0 Yield (ft³/sack) 1.17 Mix H20 Ratio (gal/sack) 5.07 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) 104.0 Thickening Time (hr) 8.00 CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Intermediate String 1 Cement Page 1/1 CD4-597 Report Printed: 9/26/2022 Cement Cement Details Description Intermediate String 2 Cement Cementing Start Date 8/31/2022 12:00 Cementing End Date 8/31/2022 14:00 Wellbore Name CD4-597 Comment PJSM WITH ALL HANDS ON CEMENT JOB. PT SURFACE LINES T/ 4500 PSI, CHARTED. PUMP 40 BBL OF MUD PUSH @ 5 BPM, 339 PSI, 36% F/O 20 RPM, 10K TQ. DROP BTM PLUG AND CHASE WITH 87.1 BBL OF 13PPG LEAD CEMENT @ 5 BPM, 327 PSI, 34% 20RPM, 10K TQ. PUMP 22 BBL OF 15.8 PPG TAIL CEMENT @ 4 BPM, 105 PSI, 33% F/O 11K TQ @ 20 RPM. DROP BTM PLUG AND CHASE WITH 20 BBL OF H20 VIA CEMENTERS. CHASE WITH RIG PUMPS @ 5 BPM 270 PSI, 35% F/O CATCH PRESSURE @ 65 STKS. FIRST PLUG LANDED @ 1309 STKS. STAGE UP T/ 6 BPM, 938 PSI, 34% F/O 20 RPM, 17K MAX TQ SEEN. SLOW DOWN TO 3BPM 577 PSI, 32% F/O, 0 RPM, 2ND PLUG LAND @ 3191 STKS. PRESSURE UP 500 OVER T/ 1100 PSI. HOLD F/ 5 MIN. BLEED OFF AND CHECK FLOATS. FLOATS HELD Cement Stages Stage # 1 Description Intermediate String 2 Cement Objective Top Depth (ftKB) 9,475.0 Bottom Depth (ftKB) 12,476.0 Full Return? Yes Vol Cement … 0.0 Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 5 Q Pump Final (bbl/… 4 Q Pump Avg (bbl/… 5 P Pump Final (psi) 600.0 P Plug Bump (psi) 1,100.0 Recip? No Stroke (ft) Rotated? Yes Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Pipe/String Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment PJSM WITH ALL HANDS ON CEMENT JOB. PT SURFACE LINES T/ 4500 PSI, CHARTED. PUMP 40 BBL OF MUD PUSH @ 5 BPM, 339 PSI, 36% F/O 20 RPM, 10K TQ. DROP BTM PLUG AND CHASE WITH 87.1 BBL OF 13PPG LEAD CEMENT @ 5 BPM, 327 PSI, 34% 20RPM, 10K TQ. PUMP 22 BBL OF 15.8 PPG TAIL CEMENT @ 4 BPM, 105 PSI, 33% F/O 11K TQ @ 20 RPM. DROP BTM PLUG AND CHASE WITH 20 BBL OF H20 VIA CEMENTERS. CHASE WITH RIG PUMPS @ 5 BPM 270 PSI, 35% F/O CATCH PRESSURE @ 65 STKS. FIRST PLUG LANDED @ 1309 STKS. STAGE UP T/ 6 BPM, 938 PSI, 34% F/O 20 RPM, 17K MAX TQ SEEN. SLOW DOWN TO 3BPM 577 PSI, 32% F/O, 0 RPM, 2ND PLUG LAND @ 3191 STKS. PRESSURE UP 500 OVER T/ 1100 PSI. HOLD F/ 5 MIN. BLEED OFF AND CHECK FLOATS. FLOATS HELD Cement Fluids & Additives Fluid Fluid Type Lead Cement Fluid Description Estimated Top (ftKB) 9,475.0 Est Btm (ftKB) 11,976.0 Amount (sacks) 257 Class G Volume Pumped (bbl) 87.0 Yield (ft³/sack) 1.89 Mix H20 Ratio (gal/sack) 10.30 Free Water (%) Density (lb/gal) 13.00 Plastic Viscosity (cP) Thickening Time (hr) 15.00 CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Fluid Fluid Type Tail Cement Fluid Description Estimated Top (ftKB) 11,976.0 Est Btm (ftKB) 12,476.0 Amount (sacks) 106 Class G Volume Pumped (bbl) 22.0 Yield (ft³/sack) 1.17 Mix H20 Ratio (gal/sack) 5.08 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) Thickening Time (hr) 7.50 CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Intermediate String 2 Cement TO: AOGCC 333 WEST 7T" SUITE 100 ANCH. AK. 99501 279-1433 OPERATOR: CPAI SAMPLE TYPE: Dry Cuttings SAMPL S SENT: ) CD4-597 �34 -3 5 - 18350 5 Boxes SENT BY: M. McCRACKEN SAMPLE TRANSMITTAL 3 y 50 - � (2) 3�;-0 ov�� ,?;,-) - 0 19 DATE: September 29, 2022 AIR BILL: N/A CPAL 2022092901 CHARGE CODE: N/A NAME: CD4-597 NUMBER OF BOXES: 5 Box UPON RECEIPT OF THESE SAMPLES, PLEASE NOTE ANY DISCREPANCIES AND RETURN A SIGNED COPY OF THIS FORM TO: RECEIVE CONOCOPHILLIPS, ALASKA 700 G ST ATO-380 ANCHORAGE, AK. 99510 ATTN: MIKE McCRACKEN Mike.mccracken@conocophillips.com L i3OPP�'q(—etIZZ RECEIVE® AOGCC  5HJJ-DPHV% 2*& )URP%URRNV3KRHEH/ 2*& 6HQW7XHVGD\6HSWHPEHU$0 7R5LJ &F5HJJ-DPHV% 2*& 6XEMHFW5((PDLOLQJ&'%23(7HVW[OV[ $WWDFKPHQWV'R\RQ[OV[ dŚĂŶŬLJŽƵ͘ƚƚĂĐŚĞĚŝƐĂƌĞǀŝƐĞĚƌĞƉŽƌƚǁŝƚŚƚŚĂƚĂĚĚŝƚŝŽŶ͘WůĞĂƐĞƵƉĚĂƚĞLJŽƵƌĐŽƉLJ͘ WŚŽĞďĞƌŽŽŬƐ ZĞƐĞĂƌĐŚŶĂůLJƐƚ ůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ WŚŽŶĞ͗ϵϬϳͲϳϵϯͲϭϮϰϮ KE&/Ed/>/dzEKd/͗dŚŝƐĞͲŵĂŝůŵĞƐƐĂŐĞ͕ŝŶĐůƵĚŝŶŐĂŶLJĂƚƚĂĐŚŵĞŶƚƐ͕ĐŽŶƚĂŝŶƐŝŶĨŽƌŵĂƚŝŽŶĨƌŽŵƚŚĞůĂƐŬĂKŝů ĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ;K'Ϳ͕^ƚĂƚĞŽĨůĂƐŬĂĂŶĚŝƐĨŽƌƚŚĞƐŽůĞƵƐĞŽĨƚŚĞŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚ;ƐͿ͘/ƚŵĂLJ ĐŽŶƚĂŝŶĐŽŶĨŝĚĞŶƚŝĂůĂŶĚͬŽƌƉƌŝǀŝůĞŐĞĚŝŶĨŽƌŵĂƚŝŽŶ͘dŚĞƵŶĂƵƚŚŽƌŝnjĞĚƌĞǀŝĞǁ͕ƵƐĞŽƌĚŝƐĐůŽƐƵƌĞŽĨƐƵĐŚŝŶĨŽƌŵĂƚŝŽŶŵĂLJ ǀŝŽůĂƚĞƐƚĂƚĞŽƌĨĞĚĞƌĂůůĂǁ͘/ĨLJŽƵĂƌĞĂŶƵŶŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚŽĨƚŚŝƐĞͲŵĂŝů͕ƉůĞĂƐĞĚĞůĞƚĞŝƚ͕ǁŝƚŚŽƵƚĨŝƌƐƚƐĂǀŝŶŐŽƌ ĨŽƌǁĂƌĚŝŶŐŝƚ͕ĂŶĚ͕ƐŽƚŚĂƚƚŚĞK'ŝƐĂǁĂƌĞŽĨƚŚĞŵŝƐƚĂŬĞŝŶƐĞŶĚŝŶŐŝƚƚŽLJŽƵ͕ĐŽŶƚĂĐƚWŚŽĞďĞƌŽŽŬƐĂƚϵϬϳͲϳϵϯͲ ϭϮϰϮŽƌƉŚŽĞďĞ͘ďƌŽŽŬƐΛĂůĂƐŬĂ͘ŐŽǀ͘ ͲͲͲͲͲKƌŝŐŝŶĂůDĞƐƐĂŐĞͲͲͲͲͲ &ƌŽŵ͗ZŝŐϭϰϮфƌŝŐϭϰϮΛĚŽLJŽŶĚƌŝůůŝŶŐ͘ĐŽŵх ^ĞŶƚ͗dƵĞƐĚĂLJ͕^ĞƉƚĞŵďĞƌϭϯ͕ϮϬϮϮϵ͗ϱϵD dŽ͗ƌŽŽŬƐ͕WŚŽĞďĞ>;K'ͿфƉŚŽĞďĞ͘ďƌŽŽŬƐΛĂůĂƐŬĂ͘ŐŽǀх ^ƵďũĞĐƚ͗Z͗ŵĂŝůŝŶŐ͗ϰͲϱϵϳKWdĞƐƚϵͲϮͲϮϮ͘džůƐdž ϲďŽƚƚůĞƐŵĂΖĂŵ͕ &ƌĂŶŬ ͲͲͲͲͲKƌŝŐŝŶĂůDĞƐƐĂŐĞͲͲͲͲͲ &ƌŽŵ͗ƌŽŽŬƐ͕WŚŽĞďĞ>;K'ͿфƉŚŽĞďĞ͘ďƌŽŽŬƐΛĂůĂƐŬĂ͘ŐŽǀх ^ĞŶƚ͗dƵĞƐĚĂLJ͕^ĞƉƚĞŵďĞƌϭϯ͕ϮϬϮϮϵ͗ϱϲD dŽ͗ZŝŐϭϰϮфƌŝŐϭϰϮΛĚŽLJŽŶĚƌŝůůŝŶŐ͘ĐŽŵх ^ƵďũĞĐƚ͗Z͗ŵĂŝůŝŶŐ͗ϰͲϱϵϳKWdĞƐƚϵͲϮͲϮϮ͘džůƐdž &ƌĂŶŬ͕ tŚĂƚǁĂƐƚŚĞηŽĨEŝƚŐŶ͘ŽƚƚůĞƐ͍ dŚĂŶŬLJŽƵ͕ WŚŽĞďĞ WŚŽĞďĞƌŽŽŬƐ ZĞƐĞĂƌĐŚŶĂůLJƐƚ ůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ WŚŽŶĞ͗ϵϬϳͲϳϵϯͲϭϮϰϮ &58&' 37'  KE&/Ed/>/dzEKd/͗dŚŝƐĞͲŵĂŝůŵĞƐƐĂŐĞ͕ŝŶĐůƵĚŝŶŐĂŶLJĂƚƚĂĐŚŵĞŶƚƐ͕ĐŽŶƚĂŝŶƐŝŶĨŽƌŵĂƚŝŽŶĨƌŽŵƚŚĞůĂƐŬĂKŝů ĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ;K'Ϳ͕^ƚĂƚĞŽĨůĂƐŬĂĂŶĚŝƐĨŽƌƚŚĞƐŽůĞƵƐĞŽĨƚŚĞŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚ;ƐͿ͘/ƚŵĂLJ ĐŽŶƚĂŝŶĐŽŶĨŝĚĞŶƚŝĂůĂŶĚͬŽƌƉƌŝǀŝůĞŐĞĚŝŶĨŽƌŵĂƚŝŽŶ͘dŚĞƵŶĂƵƚŚŽƌŝnjĞĚƌĞǀŝĞǁ͕ƵƐĞŽƌĚŝƐĐůŽƐƵƌĞŽĨƐƵĐŚŝŶĨŽƌŵĂƚŝŽŶŵĂLJ ǀŝŽůĂƚĞƐƚĂƚĞŽƌĨĞĚĞƌĂůůĂǁ͘/ĨLJŽƵĂƌĞĂŶƵŶŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚŽĨƚŚŝƐĞͲŵĂŝů͕ƉůĞĂƐĞĚĞůĞƚĞŝƚ͕ǁŝƚŚŽƵƚĨŝƌƐƚƐĂǀŝŶŐŽƌ ĨŽƌǁĂƌĚŝŶŐŝƚ͕ĂŶĚ͕ƐŽƚŚĂƚƚŚĞK'ŝƐĂǁĂƌĞŽĨƚŚĞŵŝƐƚĂŬĞŝŶƐĞŶĚŝŶŐŝƚƚŽLJŽƵ͕ĐŽŶƚĂĐƚWŚŽĞďĞƌŽŽŬƐĂƚϵϬϳͲϳϵϯͲ ϭϮϰϮŽƌƉŚŽĞďĞ͘ďƌŽŽŬƐΛĂůĂƐŬĂ͘ŐŽǀ͘ ͲͲͲͲͲKƌŝŐŝŶĂůDĞƐƐĂŐĞͲͲͲͲͲ &ƌŽŵ͗ZŝŐϭϰϮфƌŝŐϭϰϮΛĚŽLJŽŶĚƌŝůůŝŶŐ͘ĐŽŵх ^ĞŶƚ͗^ĂƚƵƌĚĂLJ͕^ĞƉƚĞŵďĞƌϯ͕ϮϬϮϮϯ͗ϬϱWD dŽ͗ZĞŐŐ͕:ĂŵĞƐ;K'Ϳфũŝŵ͘ƌĞŐŐΛĂůĂƐŬĂ͘ŐŽǀх͖ƌŽŽŬƐ͕WŚŽĞďĞ>;K'ͿфƉŚŽĞďĞ͘ďƌŽŽŬƐΛĂůĂƐŬĂ͘ŐŽǀх͖KK' WƌƵĚŚŽĞĂLJфĚŽĂ͘ĂŽŐĐĐ͘ƉƌƵĚŚŽĞ͘ďĂLJΛĂůĂƐŬĂ͘ŐŽǀх Đ͗ŽLJŽŶϭϰϮŽŵƉĂŶLJDĂŶфĚϭϰϮĐŵΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх ^ƵďũĞĐƚ͗ŵĂŝůŝŶŐ͗ϰͲϱϵϳKWdĞƐƚϵͲϮͲϮϮ͘džůƐdž hd/KE͗dŚŝƐĞŵĂŝůŽƌŝŐŝŶĂƚĞĚĨƌŽŵŽƵƚƐŝĚĞƚŚĞ^ƚĂƚĞŽĨůĂƐŬĂŵĂŝůƐLJƐƚĞŵ͘ŽŶŽƚĐůŝĐŬůŝŶŬƐŽƌŽƉĞŶĂƚƚĂĐŚŵĞŶƚƐ ƵŶůĞƐƐLJŽƵƌĞĐŽŐŶŝnjĞƚŚĞƐĞŶĚĞƌĂŶĚŬŶŽǁƚŚĞĐŽŶƚĞŶƚŝƐƐĂĨĞ͘ ŽLJŽŶZŝŐϭϰϮKWdĞƐƚŽŶϵͬϮͬϮϬϮϮĂƚƚĂĐŚĞĚ͕ &ƌĂŶŬsĂƌůŽ/// Z/'ϭϰϮdKK>Wh^,Z Z/'η;ϵϬϳͿϲϳϬͲϲϬϬϮ Z/'>>η;ϵϬϳͿϮϯϬͲϮϱϴϱ WĞƌƐŽŶĂůĞůůη;ϵϬϳͿϵϴϬͲϵϳϯϴ ŽLJŽŶĚƌŝůůŝŶŐ͘ĐŽŵ zŽƵƌŵĞƐƐĂŐĞŝƐƌĞĂĚLJƚŽďĞƐĞŶƚǁŝƚŚƚŚĞĨŽůůŽǁŝŶŐĨŝůĞŽƌůŝŶŬĂƚƚĂĐŚŵĞŶƚƐ͗ ϰͲϱϵϳKWdĞƐƚϵͲϮͲϮϮ͘džůƐdž EŽƚĞ͗dŽƉƌŽƚĞĐƚĂŐĂŝŶƐƚĐŽŵƉƵƚĞƌǀŝƌƵƐĞƐ͕ĞͲŵĂŝůƉƌŽŐƌĂŵƐŵĂLJƉƌĞǀĞŶƚƐĞŶĚŝŶŐŽƌƌĞĐĞŝǀŝŶŐĐĞƌƚĂŝŶƚLJƉĞƐŽĨĨŝůĞ ĂƚƚĂĐŚŵĞŶƚƐ͘ŚĞĐŬLJŽƵƌĞͲŵĂŝůƐĞĐƵƌŝƚLJƐĞƚƚŝŶŐƐƚŽĚĞƚĞƌŵŝŶĞŚŽǁĂƚƚĂĐŚŵĞŶƚƐĂƌĞŚĂŶĚůĞĚ͘ STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* SSu bm it t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Rig Owner: Rig No.:142 DATE: 9/2/22 Rig Rep.: Rig Email: Operator: Operator Rep.: Op. Rep Email: Well Name:PTD #2220190 Sundry # Operation: Drilling: X Workover: Explor.: Test: Initial: Weekly: Bi-Weekly: X Other: Rams:250 / 3500 Annular:250 / 3500 Valves:250 / 3500 MASP:1449 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result/Type Test Result Quantity Test Result Housekeeping P Well Sign P Upper Kelly 1P Permit On Location P Hazard Sec.P Lower Kelly 1P Standing Order Posted P Misc.NA Ball Type 4P Test Fluid Water Inside BOP 2P FSV Misc 0NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0NATrip Tank PP Annular Preventer 1 13 5/8 5M P Pit Level Indicators PP #1 Rams 1 3.5"x6"P Flow Indicator PP #2 Rams 1 Blind/Shear P Meth Gas Detector PP #3 Rams 1 3.5"x6"P H2S Gas Detector PP #4 Rams 0NAMS Misc 0NA #5 Rams 0NA #6 Rams 0NAACCUMULATOR SYSTEM: Choke Ln. Valves 1 3 1/8" 5M P Time/Pressure Test Result HCR Valves 2 3 1/8" 5M P System Pressure (psi)3000 P Kill Line Valves 3 3 1/8" 5M P Pressure After Closure (psi)1800 P Check Valve 0NA200 psi Attained (sec)7 P BOP Misc 0NAFull Pressure Attained (sec)57 P Blind Switch Covers: All stations Yes CHOKE MANIFOLD:Bottle Precharge:P Quantity Test Result Nitgn. Bottles # & psi (Avg.): 6@2000 P No. Valves 14 P ACC Misc 0NA Manual Chokes 1P Hydraulic Chokes 1P Control System Response Time:Time (sec) Test Result CH Misc 0NA Annular Preventer 12 P #1 Rams 6 P Coiled Tubing Only:#2 Rams 6 P Inside Reel valves 0NA #3 Rams 6 P #4 Rams 0 NA Test Results #5 Rams 0 NA #6 Rams 0 NA Number of Failures:0 Test Time:4.0 HCR Choke 1 P Repair or replacement of equipment will be made within days. HCR Kill 1 P Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 8/31/22@ 6:40 Waived By Test Start Date/Time:9/2/2022 1:00 (date) (time)Witness Test Finish Date/Time:9/2/2022 5:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Kam StJohn Doyon Test Annular & rams #1 & #3 with both a 4" and 5" test jt, All tests 250psi-lo/3500psi-Hi 5min ea. On chart. Test 2ea 4" FOSV & dart, Test 2ea. 5" FOSV & dart. Test all H2S, gas, flow & PVT alarms, both audible & visual, Rams functioned from both primary and remote controls. Drawdown conducted w/ 2 air & 2 elec pumps, All tests good, no failures. Test waived by AOGCC Kam P StJohn. F. Carlo / A. Allen CPAI A. Dorr / M. Aurthur CRU CD4-597 Test Pressure (psi): rig142@doyondrilling.com d142cm@conocophillips.com Form 10-424 (Revised 08/2022) 2022-0902_BOP_Doyon142_CRU_CD4-597 9 9 9 9 9 9 9 9 9 9 9 -5HJJ  5HJJ-DPHV% 2*& )URP%URRNV3KRHEH/ 2*& 6HQW7KXUVGD\6HSWHPEHU$0 7R5LJ &F5HJJ-DPHV% 2*& 6XEMHFW5(ODWHWHVWUHSRUW $WWDFKPHQWV'R\RQ[OV[ ƚƚĂĐŚĞĚŝƐĂƌĞǀŝƐĞĚƌĞƉŽƌƚĐŽƌƌĞĐƚŝŶŐƐŽŵĞŽĨƚŚĞĨŽƌŵĂƚƚŝŶŐĂŶĚĐŚĂŶŐŝŶŐƚŚĞ,DŝƐĐ͘ƚĞƐƚƌĞƐƵůƚƚŽ͞E͘͟WůĞĂƐĞ ƵƉĚĂƚĞLJŽƵƌĐŽƉLJ͘ dŚĂŶŬLJŽƵ͕ WŚŽĞďĞ WŚŽĞďĞƌŽŽŬƐ ZĞƐĞĂƌĐŚŶĂůLJƐƚ ůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ WŚŽŶĞ͗ϵϬϳͲϳϵϯͲϭϮϰϮ CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov.  &ƌŽŵ͗ZŝŐϭϰϮфƌŝŐϭϰϮΛĚŽLJŽŶĚƌŝůůŝŶŐ͘ĐŽŵх ^ĞŶƚ͗dƵĞƐĚĂLJ͕ƵŐƵƐƚϯϬ͕ϮϬϮϮϱ͗ϭϲWD dŽ͗ZĞŐŐ͕:ĂŵĞƐ;K'Ϳфũŝŵ͘ƌĞŐŐΛĂůĂƐŬĂ͘ŐŽǀх͖KK'WƌƵĚŚŽĞĂLJфĚŽĂ͘ĂŽŐĐĐ͘ƉƌƵĚŚŽĞ͘ďĂLJΛĂůĂƐŬĂ͘ŐŽǀх͖ ƌŽŽŬƐ͕WŚŽĞďĞ>;K'ͿфƉŚŽĞďĞ͘ďƌŽŽŬƐΛĂůĂƐŬĂ͘ŐŽǀх ^ƵďũĞĐƚ͗ůĂƚĞƚĞƐƚƌĞƉŽƌƚ >ĂƚĞdĞƐƚƌĞƉŽƌƚ͕ŵŝƐƵŶĚĞƌƐƚĂŶĚŝŶŐŝŶĐŽŵŵƵŶŝĐĂƚŝŽŶŽŶŵLJƉĂƌƚ͘ƉŽůŽŐŝĞƐ MATTHEW SAM Rig 142 Toolpusher Rig142@doyondrilling.com Doyon Rig 142 907-670-6002 Cell, 907-322-3715 &$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH &58&' 37' STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* SSu bm itt t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Rig Owner: Rig No.:142 DATE: 8/20/22 Rig Rep.: Rig Email: Operator: Operator Rep.: Op. Rep Email: Well Name:PTD #2220190 Sundry # Operation: Drilling: X Workover: Explor.: Test: Initial: Weekly: Bi-Weekly: X Other: Rams:250/3500 Annular:250/2500 Valves:250/3500 MASP:1449 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result/Type Test Result Quantity Test Result Housekeeping P Well Sign P Upper Kelly 1P Permit On Location P Hazard Sec.P Lower Kelly 1FP Standing Order Posted P Misc.NA Ball Type 4P Test Fluid Water Inside BOP 2P FSV Misc 0NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0NATrip Tank PP Annular Preventer 1 13-5/8" 5M P Pit Level Indicators PP #1 Rams 1 3.5" x 6"P Flow Indicator PP #2 Rams 1 Blind/Shear P Meth Gas Detector PP #3 Rams 1 3.5" x 6"P H2S Gas Detector PP #4 Rams 0NAMS Misc 0NA #5 Rams 0NA #6 Rams 0NAACCUMULATOR SYSTEM: Choke Ln. Valves 1 3-1/8" 5M P Time/Pressure Test Result HCR Valves 2 3-1/8" 5M P System Pressure (psi)3000 P Kill Line Valves 1 3-1/8" 5M P Pressure After Closure (psi)1800 P Check Valve 0NA200 psi Attained (sec)10 P BOP Misc 0NAFull Pressure Attained (sec)52 P Blind Switch Covers: All stations Yes CHOKE MANIFOLD:Bottle Precharge:P Quantity Test Result Nitgn. Bottles # & psi (Avg.): #6@1990 P No. Valves 14 P ACC Misc 0NA Manual Chokes 1P Hydraulic Chokes 1P Control System Response Time:Time (sec) Test Result CH Misc 0NA Annular Preventer 28 P #1 Rams 9 P Coiled Tubing Only:#2 Rams 6 P Inside Reel valves 0NA #3 Rams 7 P #4 Rams 0 NA Test Results #5 Rams 0 NA #6 Rams 0 NA Number of Failures:1 Test Time:11.5 HCR Choke 2 P Repair or replacement of equipment will be made within days. HCR Kill 2 P Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 8/19/22 06:49AM Waived By Test Start Date/Time:8/20/2022 2:00 (date) (time)Witness Test Finish Date/Time:8/20/2022 13:30 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Guy Cook Doyon Test Annular to 2500psi w/ 4", 5" Test jt's. Test Rams #1 & #3 w/ both 4" & 5" Test jts, test 2ea 4"& 5" FOSV & 1ea 4"& 5" Dart. All test 250psi-lo, 3500psi-Hi 5min ea on chart. Test all H2S, gas, pvt and flow alarms, both audible & visual. All rams functioned from both the primary and remote controls. Drawdown conducted w/ 2ea Air, and 2ea Electric pumps. Failure= Lower IBOP, changed out tested. Bottle Precharge - 1000 psi. M.Sam / H. Huntington CPAI A. Dorr / B. Marmon CRU CD4-597 Test Pressure (psi): d142cm@conocophillips.com rig142@doyondrilling.com Form 10-424 (Revised 08/2022) 2022-0820_BOP_Doyon142_CRU_CD4-597 9 9 9 9 9 9 9 9 9 9 9 9 9 9 -5HJJ FP Failure= Lower IBOP, STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________COLVILLE RIV UNIT CD4-597 JBR 09/02/2022 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:4 Rig down 3 months. 5-7/8" joint. New Annular to 5k. Op went to 5k on all components. Annular/TPR flange FP-new ring for pass. Choke hose flange FP-replace gasket for pass. TPR FP-re dress bodies for pass. TPR door seal FP-inspect/tighten for pass. Annular 10 secs; Rams 7 secs; HCRs 2 secs. Poor test. Test Results TEST DATA Rig Rep:Carlo/AllenOperator:ConocoPhillips Alaska, Inc.Operator Rep:Tucker/Arthur Rig Owner/Rig No.:Doyon 142 PTD#:2220190 DATE:8/7/2022 Type Operation:DRILL Annular: 250/5000Type Test:INIT Valves: 250/5000 Rams: 250/5000 Test Pressures:Inspection No:bopSAM220808200611 Inspector Austin McLeod Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 23 MASP: 1449 Sundry No: CLOSURE TIME (sec) Time/Pressure P/F Location Gen.:P Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Drl. Rig P Hazard Sec.P Misc NA Upper Kelly 1 P Lower Kelly 1 P Ball Type 2 P Inside BOP 1 P FSV Misc 0 NA 14 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 1 FPCH Misc Stripper 0 NA Annular Preventer 1 13-5/8"P #1 Rams 1 3.5"x6"FP #2 Rams 1 Blind/Shear P #3 Rams 1 3.5"x6"P #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 3-1/8"P HCR Valves 2 3-1/8"P Kill Line Valves 3 3-1/8"P Check Valve 0 NA BOP Misc 2 Door/Flange FP System Pressure P3025 Pressure After Closure P1800 200 PSI Attained P8 Full Pressure Attained P59 Blind Switch Covers:PAll stations Nitgn Btls# &psi (avg)P6@2000 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector NA NAMS Misc Inside Reel Valves 0 NA 9 9 9 9 9 9 9 9 9 9 9 9 FP3.5"x6" Door/Flange FP FP Rig down 3 months.Annular/TPR flange FP-new ring for pass. Choke hose flange FP-TPR FP-re dress TPR door seal FP- Annular 10 secs; Rams 7 secs; HCRs 2 secs. Žƒ•ƒ‹Žƒ† ƒ• ‘•‡”˜ƒ–‹‘‘‹••‹‘ 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov   Chris Brillon Engineering Manager ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Re: Colville River Field, Narwhal Undefined Pool, CRU CD4-597 ConocoPhillips Alaska, Inc. Permit to Drill Number: 222-019 Surface Location: 2868’ FNL, 12’ FEL, Sec 24, T11N, R4E Bottomhole Location: 4729’ FNL, 5023’ FEL, Sec 33, T11N, R5E Dear Mr. Brillon: Enclosed is the approved application for the permit to drill the above referenced well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,composite curves for well logs run must be submitted to the AOGCCwithin 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jeremy M. Price Chair DATED this ___ day of April, 2022.  Jeremy Price Digitally signed by Jeremy Price Date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¶)1/ )(/6HF7ZQ15J( ¶)1/¶)(/6HF7ZQ15J( /216 32%R[$QFKRUDJH$ODVND &RQRFR3KLOOLSV ¶)1/¶)(/6HF7ZQ15J($'/$'/$'/$'/ $'/  &DVLQJ3URJUDP 7RS6HWWLQJ'HSWK%RWWRP6SHFLILFDWLRQV  &HPHQW9ROXPH 0'6L]H 3OXJV PHDVXUHG  LQFOXGLQJVWDJHGDWD \GV V[SSJ V[SSJ &RQGXFWRU6WUXFWXUDO /HQJWK&DVLQJ $XWKRUL]HG7LWOH $XWKRUL]HG6LJQDWXUH 3URGXFWLRQ /LQHU ,QWHUPHGLDWH $XWKRUL]HG1DPH ,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEH GHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO 6XUIDFH 3HUIRUDWLRQ'HSWK79' IW  */%)(OHYDWLRQDERYH06/ IW  3HUIRUDWLRQ'HSWK0' IW  V[SSJH[WOHDGV[SSJ& 8QFHPHQWHGOLQHUZSHUIMRLQWV (IIHFW'HSWK0' IW  (IIHFW'HSWK79' IW  6WUDWLJUDSKLF 7HVW 1R 0XGORJUHT G<HV1R 1R 'LUHFWLRQDOVY\UHT G<HV1RR 6HDEHG5HSRUW'ULOOLQJ)OXLG3URJUDP $$&UHTXLUHPHQWV %236NHWFK'ULOOLQJ3URJUDP 7LPHY'HSWK3ORW6KDOORZ+D]DUG$QDO\VLV 6LQJOH:HOO *DV+\GUDWHV 1R ,QFOLQDWLRQRQO\VY\UHT G<HV1RR  ([SORUDWRU\2LO 'HYHORSPHQW *DV 6HUYLFH 6XSSO\0XOWLSOH=RQH *HRWKHUPDO 1RRR  1R )RUP5HYLVHG7KLVSHUPLWLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDOSHU$$& J   By Samantha Carlisle at 10:34 am, Feb 17, 2022 SUHSURGXFHG '/% '65  ;  12 '/% ; ;  %23( WHVW WR  SVLJ $QQXODU SUHYHQWHU WHVW WR  SVLJ 'LYHUWHU YDULDQFH JUDQWHG SHU  $$&  K  6HH DWWDFKHG &RQGLWLRQV RI $SSURYDO IRU WKH LQWHUPHGLDWH FHPHQW MRE DQG VRQLF ORJJLQJ ; ;  ; 12 ; 97/  8QGHILQHG 2LO '/% (5,2  DXWKRUL]HV ZDWHU LQMHFWLRQ RQO\ QR :$* ZR DQ DPHQGPHQW WR WKH RUGHU LVVXHG E\ $2*&& '/% :DLYHU IRU &3$, 5RWDU\ 5LJ %23( 7HVW )UHTXHQF\ DSSOLHV DFFRUGLQJ WR RUGHU27+ DWWDFKHG '/%  ;   ;  dts 4/4/2022 JLC 4/4/2022 4/4/22 Jeremy Price Digitally signed by Jeremy Price Date: 2022.04.04 11:36:47 -08'00' CRU CD4-597 (PTD 222-019) Conditions of Approval: Approval is granted to run the LWD-Sonic on upcoming well with the following provisions: 1. CPAI will provide a written log evaluation/interpretation to the AOGCC along with the log as soon as they become available. The evaluation is to include/highlight the intervals of competent cement that CPAI is using to meet the objective requirements for annular isolation, reservoir isolation, or confining zone isolation etc. Providing the log without an evaluation/interpretation is not acceptable. 2. LWD sonic logs must show free pipe and Top of Cement, just as the e-line log does. CPAI must start the log at a depth to ensure the free pipe above the TOC is captured as well as the TOC. Starting the log below the actual TOC based on calculations predicting a different TOC will not be acceptable. 3. CPAI will provide a cement job summary report and evaluation along with the cement log and evaluation to the AOGCC when they become available 4. CPAI will provide the results of the FIT when available. 5. Depending on the cement job results indicated by the cement job report, the logs and the FIT, remedial measures or additional logging may be required.  Žƒ•ƒ‹Žƒ† ƒ• ‘•‡”˜ƒ–‹‘‘‹••‹‘   333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov   -DQXDU\ &(57,),('0$,/± 5(78515(&(,375(48(67('  0U/XNH/DZUHQFH :HOOV0DQDJHU &RQRFR3KLOOLSV$ODVND *6WUHHW $QFKRUDJH$. 5H 'RFNHW1XPEHU27+ $SSOLFDWLRQIRU:DLYHURQ&3$,5RWDU\ 5LJ%23(7HVW)UHTXHQF\ 'HDU0U/DZUHQFH %\OHWWHUGDWHG0D\&RQRFR3KLOOLSV$ODVND,QF &3$, UHTXHVWHGDZDLYHUIURPWKH $ODVND 2LO DQG *DV &RQVHUYDWLRQ &RPPLVVLRQ¶V $2*&&  UHJXODWRU\ UHTXLUHG EORZRXW SUHYHQWLRQHTXLSPHQW %23( WHVWIUHTXHQF\IRUDOO&3$,URWDU\GULOOLQJULJVSHWLWLRQLQJWRWHVW WKHEORZRXWSUHYHQWLRQHTXLSPHQW %23( RQDGD\WHVWVFKHGXOH$2*&&JUDQWVDSSURYDO IRUOLPLWHGGXUDWLRQDQGVFRSH &3$,PHWZLWK$2*&&RQ$SULOVXPPDUL]HGLWVREMHFWLYHLQUHTXHVWLQJDSSURYDORID GD\%23(WHVWVFKHGXOH LPSURYH&3$,¶VDELOLW\WRFRPSHWHIRUFRUSRUDWH FDSLWDOLQYHVWPHQWV  H[SODLQHGDOLJQPHQWZLWKLQGXVWU\VWDQGDUG%23(WHVWFULWHULD DQG&RQRFR3KLOOLSVJOREDOZHOO FRQWUROSROLF\DQGSURYLGHGDQRYHUYLHZRIQHZGULOOLQJWDUJHWVSODQQHGXVLQJD³KLJKVSHF H[WHQGHGUHDFKGULOOLQJULJ´&3$,DOVRSURYLGHGGHWDLOVDERXWWKHVFRSHDQG%23(SHUIRUPDQFH DFKLHYHPHQWV XQGHU LWV %HWZHHQ :HOO 0DLQWHQDQFH 3URJUDP %:0  IRU URWDU\ GULOOLQJ DQG ZRUNRYHUULJV $VZLWKSUHYLRXVUHTXHVWVWRH[WHQGWKH%23(WHVWLQWHUYDO&3$,UHIHUHQFHVQXPHURXVUHJXODWRU\ MXULVGLFWLRQVDVZHOODVVXJJHVWHGLQGXVWU\SUDFWLFHIURPWKH$PHULFDQ3HWUROHXP,QVWLWXWHUHODWLQJ WR WHVW IUHTXHQF\ HDFK SURYLGLQJIRU %23( WHVWLQJ DW LQWHUYDOV EH\RQG  GD\V &3$, DOVR UHIHUHQFHVLWVLQWHUQDOZHOOFRQWUROPDQXDOZKLFKDOORZVIRUWHVWLQJDWLQWHUYDOVEH\RQGGD\V ϭW/^ƚĂŶĚĂƌĚϱϯ͕͞tĞůůŽŶƚƌŽůƋƵŝƉŵĞŶƚ^LJƐƚĞŵƐĨŽƌƌŝůůŝŶŐtĞůůƐ͕͟ϱƚŚĚŝƚŝŽŶ;ĞĐĞŵďĞƌϮϬϭϴͿ ϮK'ĂƉƉƌŽǀĂůŽĨƚŚĞtDƉƌŽŐƌĂŵŚĂƐĞŶĂďůĞĚW/ǁŽƌŬŽǀĞƌƌŝŐƐƚŽĞdžƚĞŶĚƚŚĞŝŶƚĞƌǀĂůďĞƚǁĞĞŶKWƚĞƐƚƐ ĨƌŽŵĞǀĞƌLJϳĚĂLJƐƚŽŶŽƚĞdžĐĞĞĚŝŶŐϭϰĚĂLJƐ͘W/ĚĂƚĂƐŚŽǁƐƚŚĞtDŚĂƐƌĞĚƵĐĞĚƚŚĞŶƵŵďĞƌŽĨĐŽŵƉŽŶĞŶƚ ĨĂŝůƵƌĞƐĚƵƌŝŶŐKWƚĞƐƚŝŶŐďLJƌĞƉůĂĐŝŶŐĐŽŵƉŽŶĞŶƚƐƚŚĂƚŝŶĚŝĐĂƚĞƐƵƐƉĞĐƚŝŶƚĞŐƌŝƚLJďĞĨŽƌĞƚŚŽƐĞĐŽŵƉŽŶĞŶƚƐĨĂŝů ĚƵƌŝŶŐƚĞƐƚŝŶŐ͘ 'RFNHW1XPEHU27+ &3$,±GD\%23(7HVW,QWHUYDO -DQXDU\ ,PSURYHPHQW LQ %23( SHUIRUPDQFH WHVWLQJ UHVXOWV DWWULEXWHG WR &3$,¶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¶VUHTXHVWIRUD YDULDQFHIURPUHJXODWRU\UHTXLUHPHQWV RI$$& H  $ LV DSSURYHGIRUGULOOLQJULJV'R\RQDQG'R\RQDVDSLORWSURMHFWZLWKWKHIROORZLQJFRQGLWLRQV  7KHSLORWWHVWGXUDWLRQLVIRU21( \HDU IURPWKHDSSURYDOGDWHRIWKLVOHWWHUVXEMHFWWR SRWHQWLDOH[WHQVLRQDQG H[SDQVLRQWRLQFOXGHRWKHU&3$,RSHUDWHGULJVZLWK DWOHDVW PRQWKVRIFRQWLQXRXVULJZRUNDQG$2*&&UHYLHZRIDULJ¶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eremy Price Digitally signed by Jeremy Price Date: 2022.01.25 13:00:50 -09'00' &RQRFR3KLOOLSV$ODVND,QF    3RVW2IILFH%R[    $QFKRUDJH$ODVND    7HOHSKRQH   )HEUXDU\WK  $ODVND2LODQG*DV&RQVHUYDWLRQ&RPPLVVLRQ :HVWWK$YHQXH6XLWH $QFKRUDJH$ODVND   5H $SSOLFDWLRQIRU3HUPLWWR'ULOO&'  'HDU6LURU0DGDP   &RQRFR3KLOOLSV$ODVND,QFKHUHE\DSSOLHVIRUD3HUPLWWR'ULOODQRQVKRUHGHYHORSPHQWZHOOIURPWKH&'GULOOLQJSDG7KHLQWHQGHGVSXG GDWHIRUWKLVZHOOLV0DUFKWK,WLVLQWHQGHGWKDW'R\RQ5LJWREHXVHGWRGULOOWKHZHOO  &'LVSODQQHGWREHDKRUL]RQWDO1DUZKDOVDQGSUHSURGXFHGLQMHFWRU7KH´VXUIDFHKROHZLOO7'DERYHWKH&VDQGDQGWKHQ ´FDVLQJZLOOEHVHWDQGFHPHQWHGWRVXUIDFH  7KHLQWHUPHGLDWHKROHZLOOEHGULOOHGLQWZRVHFWLRQVWRPLWLJDWHLVVXHVZLWKIRUPDWLRQLQVWDELOLW\RYHUWKHORQJLQWHUYDO7KH´ LQWHUPHGLDWHVHFWLRQZLOOEHGULOOHGWREHORZWKH&VDQGDQGODQGHGDWDQLQFOLQDWLRQRIaƒ$´FDVLQJVWULQJZLOOEHVHWDQG FHPHQWHGIURP7'WRVHFXUHWKHVKRHDQGFRYHU¶79' ZKLFKLVJUHDWHUWKDQ¶0' DERYHWKHVKRH   7KHVHFRQGLQWHUPHGLDWHZLOOEHGULOOHGZLWKD´VWHHUDEOHGULOOLQJDVVHPEO\XOWLPDWHO\ODQGLQJ¶79'DERYHWKH1DUZKDOVDQGDWDQ LQFOLQDWLRQRIaƒ$´OLQHUVWULQJZLOOEHVHWDQGFHPHQWHGIURP7'WRVHFXUHWKHVKRHDQGFRYHU¶0'DERYHWRSRIXSSHUPRVW K\GURFDUERQEHDULQJ]RQH.WRSURYLGHVXIILFLHQWLVRODWLRQDQGUHGXFHORVVHVGXULQJWKHFHPHQWLQJMREGXHWRZHDNIRUPDWLRQV2IIVHWZHOOV &'DQG&'KDYHEHHQDSSURYHGE\$2*&&RQVDPHFHPHQWGHVLJQ,WLVDOVRLQFOXGHGLQWKH(5,2DSSOLFDWLRQ   7KHSURGXFWLRQLQWHUYDOZLOOEHFRPSULVHGRID´KRUL]RQWDOKROHWKDWZLOOEHJHRVWHHUHGLQWKH1DUZKDOVDQG7KHZHOOZLOOEH FRPSOHWHGDVDQXQVWLPXODWHGLQMHFWRUZLWK´OLQHUZLWKSUHSHUIRUDWHGMRLQWVDQGWLHGEDFNWRVXUIDFHZLWKD´WXELQJXSSHU FRPSOHWLRQVWULQJ7KHZHOOZLOOEHWLHGLQWRH[LVLWLQJ&'IDFLOLWLHV  ,WLVUHTXHVWHGWKDWDYDULDQFHRIWKHGLYHUWHUUHTXLUHPHQWXQGHU$$& K   LVJUDQWHGIRUZHOO&'$W&'WKHUHKDVQRW EHHQDVLJQLILFDQWLQGLFDWLRQRIVKDOORZJDVK\GUDWHVWKURXJKWKHVXUIDFHKROHLQWHUYDO   3OHDVHILQGDWWDFKHGWKHLQIRUPDWLRQUHTXLUHGE\$&& D DQG F IRU\RXUUHYLHZ3HUWLQHQWLQIRUPDWLRQDWWDFKHGWRWKLV DSSOLFDWLRQLQFOXGHVWKHIROORZLQJ  )RUP$33/,&$7,21)253HUPLWWR'ULOOSHU$&& D  $SURSRVHGGULOOLQJSURJUDP $SURSRVHGFRPSOHWLRQGLDJUDP $GULOOLQJIOXLGVSURJUDPVXPPDU\ 3UHVVXUHLQIRUPDWLRQDVUHTXLUHGE\$&& G   'LUHFWLRQDOGULOOLQJFROOLVLRQDYRLGDQFHLQIRUPDWLRQDVUHTXLUHGE\$&& E  ,QIRUPDWLRQSHUWLQHQWWRWKHDSSOLFDWLRQWKDWLVSUHVHQWO\RQILOHDWWKH$2*&&  'LDJUDPVRIWKH%23HTXLSPHQWGLYHUWHUHTXLSPHQWDQGFKRNHPDQLIROGOD\RXWDVUHTXLUHGE\$&& D  DQG E  $GHVFULSWLRQRIWKHGULOOLQJIOXLGVKDQGOLQJV\VWHP 'LDJUDPRIULVHUVHWXS  ,I\RXKDYHDQ\TXHVWLRQVRUUHTXLUHIXUWKHULQIRUPDWLRQSOHDVHFRQWDFW +DLELQ*XR   +DLELQ*XR#FRQRFRSKLOOLSVFRP RU&KULV%ULOORQ   &KULVO%ULOORQ#FRQRFRSKLOOLSVFRP  6LQFHUHO\      FF &':HOO)LOH-HQQD7D\ORU$72 'DYLG/HH$72 &KULV%ULOORQ    $72 +DLELQ*XR$QG\0DFN.XXNSLN 'ULOOLQJ(QJLQHHU      '/%  '/% &'LVSODQQHGWREHDKRUL]RQWDO1DUZKDOVDQGSUHSURGXFHGLQMHFWRU ,WLVUHTXHVWHGWKDWDYDULDQFHRIWKHGLYHUWHUUHTXLUHPHQWXQGHU$$& K   LVJUDQWHGIRUZHOO&'$W&'WKHUHKDVQRW EHHQDVLJQLILFDQWLQGLFDWLRQRIVKDOORZJDVK\GUDWHVWKURXJKWKHVXUIDFHKROHLQWHUYDOWW TT $SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&' Page 1 of 7 3HUPLW±&' Application for Permit to Drill Document  7DEOHRI&RQWHQWV ................................................................................................................................................................ 2 :HOO1DPH Requirements of 20 AAC 25.005 (f) ............................................................................................................. 2 /RFDWLRQ6XPPDU\ Requirements of 20 AAC 25.005(c)(2) ......................................................................................................... 2 Requirements of 20 AAC 25.050(b) ............................................................................................................. 2 %ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ Requirements of 20 AAC 25.005(c)(3) ......................................................................................................... 3 'ULOOLQJ+D]DUGV,QIRUPDWLRQ Requirements of 20 AAC 25.005 (c)(4) ........................................................................................................ 3 3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\7HVWV Requirements of 20 AAC 25.005 (c)(5) ........................................................................................................ 3 &DVLQJDQG&HPHQWLQJ3URJUDP Requirements of 20 AAC 25.005(c)(6) ......................................................................................................... 4 'LYHUWHU6\VWHP,QIRUPDWLRQ Requirements of 20 AAC 25.005(c)(7) ......................................................................................................... 4 'ULOOLQJ)OXLG3URJUDP Requirements of 20 AAC 25.005(c)(8) ......................................................................................................... 4 $EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ Requirements of 20 AAC 25.005 (c)(9) ........................................................................................................ 5 6HLVPLF$QDO\VLV Requirements of 20 AAC 25.005 (c)(10) ....................................................................................................... 5 6HDEHG&RQGLWLRQ$QDO\VLV Requirements of 20 AAC 25.005 (c)(11) ....................................................................................................... 5 (YLGHQFHRI%RQGLQJ Requirements of 20 AAC 25.005 (c)(12) ....................................................................................................... 5 3URSRVHG'ULOOLQJ3URJUDP Requirements of 20 AAC 25.005 (c)(13) ....................................................................................................... 5 'LVFXVVLRQRI0XGDQG&XWWLQJV'LVSRVDODQG$QQXODU'LVSRVDO Requirements of 20 AAC 25.005 (c)(14) ....................................................................................................... 7 $SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&' Page 2 of 7 $WWDFKPHQWV Attachment 1: Location Maps ..................................................................................................................... 7 Attachment 2: Directional Plan ................................................................................................................... 7 Attachment 3: Drilling Hazards Summary .................................................................................................... 7 Attachment 4: Cement Summary ................................................................................................................. 7 Attachment 5: Well Schematic .................................................................................................................... 7 Attachment 6: Wellhead Schematic ............................................................ Error! Bookmark not defined. :HOO1DPH Requirements of 20 AAC 25.005 (f) Each well must be identified by a unique name designated by the operator and a unique API number assigned by the commission under 20 AAC 25.040(b). For a well with multiple well branches, each branch must similarly be identified by a unique name and API number by adding a suffix to the name designated for the well by the operator and to the number assigned to the well by the commission. 7KHZHOOIRUZKLFKWKLVDSSOLFDWLRQLVVXEPLWWHGZLOOEHGHVLJQDWHGDV&'  /RFDWLRQ6XPPDU\ Requirements of 20 AAC 25.005(c)(2) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (2) a plat identifying the property and the property's owners and showing (A)the coordinates of the proposed location of the well at the surface, at the top of each objective formation, and at total depth, referenced to governmental section lines. (B) the coordinates of the proposed location of the well at the surface, referenced to the state plane coordinate system for this state as maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administration; (C) the proposed depth of the well at the top of each objective formation and at total depth: and (D) other information required by 20 AAC 25.050(b);  /RFDWLRQDW6XUIDFH¶)1/¶)(/6HF7ZQ15J( NAD 27 Northings: 5957539 Eastings: 378233 RKB Elevation ¶$06/ Pad Elevation ¶$06/  /RFDWLRQDW7RSRI3URGXFWLYH,QWHUYDO +HHO  ¶)1/¶)(/6HF7ZQ15J( NAD 27 Northings: 5949616 Eastings: 385994 Measured Depth, RKB: ¶ Total Vertical Depth, RKB: ¶ Total Vertical Depth, SS: ¶  /RFDWLRQDW7RWDO'HSWK 7RH  ¶)1/¶)(/6HF7ZQ15J( NAD 27 Northings: 5944957 Eastings: 388592 Measured Depth, RKB: ¶ Total Vertical Depth, RKB: ¶ Total Vertical Depth, SS: ¶ 3ODWVVKRZLQJWKH&'3DG&RQILJXUDWLRQZLWK'R\RQDUHLQFOXGHG  3OHDVHUHIHUWR$WWDFKPHQW/RFDWLRQ0DSV Requirements of 20 AAC 25.050(b) If a well is to be intentionally deviated, the application for a Permit to Drill (Form 10-401) must (1) include a plat, drawn to a suitable scale, showing the path of the proposed wellbore, including all adjacent wellbores within 200 feet of any portion of the proposed well;  3OHDVHUHIHUWR$WWDFKPHQW'LUHFWLRQDO3ODQ $SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&' Page 3 of 7  and (2) for all wells within 200 feet of the proposed wellbore (A) list the names of the operators of those wells, to the extent that those names are known or discoverable in public records, and show that each named operator has been furnished a copy of the application by certified mail; or (B) state that the applicant is the only affected owner. 7KHDSSOLFDQWLVWKHRQO\DIIHFWHGRZQHU %ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ Requirements of 20 AAC 25.005(c)(3) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (3) a diagram and description of the blowout prevention equipment (BOPE) as required by 20 AAC 25.035, 20 AAC 25.036, or 20 AAC 25.037, as applicable; 3OHDVHUHIHUHQFH%23VFKHPDWLFVIRU'R\RQRQILOHZLWKWKHFRPPLVVLRQ  'ULOOLQJ+D]DUGV,QIRUPDWLRQ Requirements of 20 AAC 25.005 (c)(4) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (4) information on drilling hazards, including (A) the maximum downhole pressure that may be encountered, criteria used to determine it, and maximum potential surface pressure based on a methane gradient;  ([SHFWSVLIRUPDWLRQSUHVVXUH#7'LQ1DUZKDO/HIW\6DQGRI¶79' (TXLYDOHQW0XG:HLJKW#WRS1DUZKDO&HQWUDO6DQG DERYH/HIW\VDQG  SVL ¶   SSJ  7KHPD[LPXPSRWHQWLDOVXUIDFHSUHVVXUH 0363 ZKLOHGULOOLQJ&'LVFDOFXODWHGXVLQJWKHSUHGLFWHGSVL UHVHUYRLUSUHVVXUHDSVLIWJDVJUDGLHQWDQG1DUZKDO&HQWUDOVDQGWRS79'RI¶IW  1DUZKDO6DQG(VWLPDWHG%+3   SVL 1DUZKDO6DQGHVWLPDWHGGHSWK :3   ¶79' *DV*UDGLHQW     SVLIW DVSHU$$& F  $  +\GURVWDWLFRIIXOOJDVFROXPQ   SVL ¶79' SVLIW  0363 %+3±JDVFROXPQ    SVL SVL±SVL   (B) data on potential gas zones;  7KHZHOOERUHLVQRWH[SHFWHGWRSHQHWUDWHDQ\JDV]RQHV  and (C) data concerning potential causes of hole problems such as abnormally geo-pressured strata, lost circulation zones, and zones that have a propensity for differential sticking;  7KHORFDWLRQRIWKH&'ZHOOSDWKLVFORVHLQSUR[LPLW\WRWKHUHFHQWO\GULOOHG&'DQG&'ZHOOV7KH SUHYLRXVO\FRQGXFWHG6KDOORZ+D]DUGDQG3RUH3UHVVXUH6WXG\IRU&'DQG&'FRPELQHGZLWKH[WHQVLYH GULOOLQJH[SHULHQFHRQ&'SDGVXJJHVWVWKDWQRVLJQLILFDQWKROHSUREOHPVDUHWREHH[SHFWHG  3OHDVHUHIHUWR$WWDFKPHQW'ULOOLQJ+D]DUGV6XPPDU\  3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\7HVWV Requirements of 20 AAC 25.005 (c)(5) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (5) a description of the procedure for conducting formation integrity tests, as required under 20 AAC 25.030(f); 'ULOORXWVXUIDFHFDVLQJVKRHDQGSHUIRUP/27RU),7LQDFFRUGDQFHZLWKWKH$OSLQH/27),7SURFHGXUHWKDW &RQRFR3KLOOLSV$ODVNDKDVRQILOHZLWKWKH&RPPLVVLRQ  '/% SS S# \ (TXLYDOHQW0XG:HLJKW#WRS1DUZKDO&HQWUDO6DQG DERYH/HIW\VDQG  SVL ¶   SSJ'/% 7KHZHOOERUHLVQRWH[SHFWHGWRSHQHWUDWHDQ\JDV]RQHV $SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&' Page 4 of 7 &DVLQJDQG&HPHQWLQJ3URJUDP Requirements of 20 AAC 25.005(c)(6) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (6) a complete proposed casing and cementing program as required by 20 AAC 25.030, and a description of any slotted liner, pre-perforated liner, or screen to be installed; &DVLQJ3URJUDP6SHFLILFDWLRQV7RS%RWWRP&HPHQW4XDQWLW\VDFNV +ROH&DVLQJ:HLJK W *UDG H &RXSOLQJ/HQJWK0'79'0'79' +:HOGHG\GV /7;30V[SSJ V[SSJ   /7;30V[SSJ&ODVV* 72& ¶79'DERYHFDVLQJVKRH  /7;30  V[SSJH[WOHDGV[ SSJ&ODVV* 72&¶0'DERYH .VDQG    /+\G    8QFHPHQWHGOLQHUZSHUIMRLQWV  'LYHUWHU6\VWHP,QIRUPDWLRQ Requirements of 20 AAC 25.005(c)(7) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (7) a diagram and description of the diverter system as required by 20 AAC 25.035, unless this requirement is waived by the commission under 20 AAC 25.035(h)(2);  ,WLVUHTXHVWHGWKDWDYDULDQFHRIWKHGLYHUWHUUHTXLUHPHQWXQGHU$$& K  LVJUDQWHG$W&'WKHUHKDV QRWEHHQDVLJQLILFDQWLQGLFDWLRQRIVKDOORZJDVRUJDVK\GUDWHVWKURXJKWKHVXUIDFHKROHLQWHUYDO7KHUHDUH SUHYLRXVO\GULOOHGZHOOV &'&'&'&'&'&'&' ZLWKLQ¶RI WKHSURSRVHG&'VXUIDFHVKRHORFDWLRQ1RQHRIWKHVHZHOOVHQFRXQWHUHGDQ\VLJQLILFDQWLQGLFDWLRQRIVKDOORZ JDVRUJDVK\GUDWHV  'ULOOLQJ)OXLG3URJUDP Requirements of 20 AAC 25.005(c)(8) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (8) a drilling fluid program, including a diagram and description of the drilling fluid system, as required by 20 AAC 25.033;  'LDJUDPRI'R\RQPXGV\VWHPRQILOHZLWK$2*&&  'ULOOLQJIOXLGSUDFWLFHVZLOOEHLQDFFRUGDQFHZLWKDSSURSULDWHUHJXODWLRQVVWDWHGLQ$$&  0XG3URJUDP6XPPDU\  Surface 105’ – 2766’ Mud Type '5,/3/(;$5 Density (ppg)  Funnel Viscosity (seconds) 1$ Yield Point  API Fluid Loss (ml/30min) 1$ pH   Intermediate I 2766’ – 8,272’ Mud Type LSND Density (ppg) 11.0 PV 10-15 Yield Point 25-40 API Fluid Loss (ml/30min) <10 pH 9.5-10.0 '/%  Density (ppg) 11.0 Density (ppg)  $SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&' Page 5 of 7     $EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ Requirements of 20 AAC 25.005 (c)(9) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application:  1$±$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO  6HLVPLF$QDO\VLV Requirements of 20 AAC 25.005 (c)(10)  1$±$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO  6HDEHG&RQGLWLRQ$QDO\VLV Requirements of 20 AAC 25.005 (c)(11) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (11) for a well drilled from an offshore platform, mobile bottom-founded structure, jack-up rig, or floating drilling vessel, an analysis of seabed conditions as required by 20 AAC 25.061(b); 1$$SSOLFDWLRQLVQRWIRUDQRIIVKRUHZHOO  (YLGHQFHRI%RQGLQJ Requirements of 20 AAC 25.005 (c)(12) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (12) evidence showing that the requirements of 20 AAC 25.025 {Bonding}have been met; (YLGHQFHRIERQGLQJIRU&RQRFR3KLOOLSV$ODVND,QFLVRQILOHZLWKWKH&RPPLVVLRQ  3URSRVHG'ULOOLQJ3URJUDP Requirements of 20 AAC 25.005 (c)(13) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application:  7KHSURSRVHGGULOOLQJSURJUDPIRU&'LVOLVWHGEHORZ3OHDVHUHIHUDOVRWR$WWDFKPHQW:HOO6FKHPDWLF  ,QVWDOOODQGLQJULQJRQFRQGXFWRURQH[LVWLQJ´FRQGXFWRU&RQGXFWRUVHWDW¶5.% 0RYHLQULJXS'R\RQ5LJRQFRQGXFWRU Intermediate II ¶±¶ Mud Type LSND Density (ppg) 9.2 PV 10-15 Yield Point 20-30 API Fluid Loss (ml/30min) <10 pH 9.5-10.0 Production ¶±¶ Mud Type VERSAPRO MOBM Density (ppg) 8.0 PV 15-20 Yield Point 13-18 API Fluid Loss (ml/30min) NA pH NA 03' ZLOO EH HPSOR\HG '/% Density (ppg) 9.2 Density (ppg) 8.0 $SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&' Page 6 of 7 3LFNXS´'3DQGSUHSDUHVXUIDFHGULOOLQJIOXLG 6SXGDQGGLUHFWLRQDOO\GULOO´KROHWRFDVLQJSRLQWDW¶0'¶79'DVSHUGLUHFWLRQDOSODQ5XQ 0:'/:'ORJJLQJWRROVLQGULOOVWULQJDVUHTXLUHGIRUGLUHFWLRQDOPRQLWRULQJDQGIRUPDWLRQGDWDJDWKHULQJ 5XQDQGFHPHQWQHZ/7;30FDVLQJWRVXUIDFH$GHTXDWHH[FHVVFHPHQWZLOOEHSXPSHGWR HQVXUHFHPHQWUHWXUQVWKHVXUIDFH ,QVWDOOZHOOKHDGDQGWHVWWRSVL1LSSOHXS%23(LQVWDOO´[´9%5¶VDQG´6ROLG%RG\ LQWKH'RXEOH*DWH PD[VXUIDFHSUHVVXUHSVLRQHVHWRI9%5LVUHTXLUHG DQGWHVWWR SVL1RWLI\$2*&&KUVEHIRUHWHVW 38´ELWDQGURWDU\VWHHUDEOHGULOOLQJDVVHPEO\5,+FOHDQRXWFHPHQWWRWRSRIIORDWHTXLSPHQWDQGWHVW FDVLQJWRSVLIRUPLQ5XQ0:'/:'ORJJLQJWRROVLQGULOOVWULQJDVUHTXLUHGIRUGLUHFWLRQDO PRQLWRULQJDQGIRUPDWLRQGDWDJDWKHULQJ 'ULOORXWFHPHQWDQG QHZKROH3HUIRUP),7XSWRSSJ(0: PLQLPXPDFFHSWDEOHSSJ (0:  'LUHFWLRQDOO\GULOO´KROHWR¶0'¶79'5XQ0:'/:'ORJJLQJWRROVLQGULOOVWULQJDV UHTXLUHGIRUGLUHFWLRQDOPRQLWRULQJDQGIRUPDWLRQGDWDJDWKHULQJ &LUFXODWHZHOOERUHFOHDQDQGEDFNUHDPRXWRIWKHKROHWR¶0'5,+DQGZDVKWRERWWRP 'LUHFWLRQDOO\GULOO´KROHWRFDVLQJSRLQWDW¶0'¶79'5XQ0:'/:'ORJJLQJWRROVLQ GULOOVWULQJDVUHTXLUHGIRUGLUHFWLRQDOPRQLWRULQJDQGIRUPDWLRQGDWDJDWKHULQJ &LUFXODWHZHOOERUHFOHDQDQGEDFNUHDPRXWRIWKHKROHWR¶0'&RQWLQXHRXWRIKROHRQHOHYDWRUVDQG OD\GRZQ%+$ 5LJXSDQGUXQQHZ´/7;30FDVLQJ 5LJXSDQGSXPSFHPHQWDVSHUSURJUDP'LVSODFHFHPHQWZLWKPXGFKHFNIORDWVXSRQEXPSLQJSOXJ7RSRI FHPHQWWREH0'¶79'ZKLFKLV¶79'DERYHWKHLQWHUPHGLDWH,FDVLQJVKRH 3HUIRUP%23(WHVWWRSVL1RWLI\$2*&&KUVEHIRUHWHVW 3LFNXS´ELWDQGURWDU\VWHHUDEOHDVVHPEO\RQ´'3VWULQJ5,+FOHDQRXWFHPHQWWRWRSRIIORDW HTXLSPHQWDQGWHVWFDVLQJWRSVLIRUPLQ 'ULOORXWFHPHQWDQG RIQHZKROH3HUIRUP),7XSWRSSJ(0: PLQLPXPDFFHSWDEOHSSJ (0:  ,QVWDOO0DQDJHG3UHVVXUH'ULOOLQJ 03' EHDULQJDVVHPEO\DQGGLVSODFHWRSSJGULOOLQJIOXLGKROGLQJQHDU FRQVWDQWERWWRPKROHSUHVVXUHRISSJIRUWKHUHVWRIWKHVHFWLRQ 'LUHFWLRQDOO\GULOO´,QWHUPHGLDWH,,KROHWRFDVLQJSRLQWDW¶0'¶79'ODQGLQJ¶79' DERYHWRSRI1DUZKDO&HQWUDO6DQG5XQ0:'/:'ORJJLQJWRROVLQGULOOVWULQJDVUHTXLUHGIRUGLUHFWLRQDO PRQLWRULQJDQGIRUPDWLRQGDWDJDWKHULQJ &LUFXODWHZHOOFOHDQIORZFKHFNDQGEDFNUHDPRXWRIKROHWR,QWHUPHGLDWH,FDVLQJVKRH&%8[RUXQWLOVKDOH VKDNHUFOHDQ6WULSRXWRIKROHRQHOHYDWRUVDQGOD\GRZQ%+$ 5LJXSDQGUXQQHZ´/7;30FDVLQJKDQJHUDQGOLQHUWRSSDFNHURQ'3 5LJXSDQGSXPSFHPHQWDVSHUSURJUDP'LVSODFHFHPHQWZLWKPXGFKHFNIORDWVXSRQEXPSLQJSOXJ7RSRI FHPHQWWREH¶0'¶79'ZKLFKLV¶0'DERYHWRSRIXSSHUPRVWK\GURFDUERQEHDULQJ ]RQH.WRSURYLGHVXIILFLHQWLVRODWLRQDQGUHGXFHORVVHVGXULQJWKHFHPHQWLQJMREGXHWRZHDNIRUPDWLRQV 2IIVHWZHOOV&'DQG&'KDYHEHHQDSSURYHGE\$2*&&RQVDPHFHPHQWGHVLJQ,WLVDOVRLQFOXGHG LQWKH(5,2DSSOLFDWLRQ 3LFNXS´%LWDQGURWDU\VWHHUDEOHGULOOLQJDVVHPEO\DQGVLQJOHLQRQ´´'3WDSSHUVWULQJ5,+DQG FOHDQRXWFHPHQWWRWRSRIIORDWHTXLSPHQW7HVWFDVLQJWRSVLIRUPLQ 'ULOORXWFHPHQWDQG RIQHZKROH3HUIRUP/27 PLQLPXPDFFHSWDEOHSSJ(0: 'LVSODFHWR SSJ02%0GULOOLQJIOXLG 97/  97/  ,QVWDOO0DQDJHG3UHVVXUH'ULOOLQJ 03' EHDULQJDVVHPEO\ &HPHQW MRE UHSRUW 72& FDOFXODWLRQV DQG HYDOXDWLRQ WR $2*&& DV VRRQ DV DYDLODEOH &HPHQW MRE UHSRUW 72& FDOFXODWLRQV DQG HYDOXDWLRQ WR $2*&& DV VRRQ DV DYDLODEOH $SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&' Page 7 of 7 'LUHFWLRQDOO\GULOO´KROHLQWRWKH1DUZKDO/HIW\6DQGWR7'DW¶0'¶79'DVSHU GLUHFWLRQDOSODQ5XQ0:'/:'ORJJLQJWRROVLQGULOOVWULQJDVUHTXLUHGIRUGLUHFWLRQDOPRQLWRULQJDQG IRUPDWLRQGDWDJDWKHULQJ5XQ6RQLFORJIRU´OLQHU72&DQGUHSRUWWR$2*&&RQFHLW¶VDYDLODEOH &LUFXODWHZHOOFOHDQIORZFKHFNDQGEDFNUHDPRXWRIKROHWRLQWHUPHGLDWH,,VKRH 'LVSODFHWR.:IOXLGDQGREVHUYHZHOOIRUIORZ7ULSRXWRIKROHRQHOHYDWRUVDQGOD\GRZQ%+$ 38DQGUXQ´/+<'ORZHUFRPSOHWLRQDQGOLQHWR7' 38DQGUXQ´/+<'WXELQJXSSHUFRPSOHWLRQFLUFXODWHDURXQGZLWKNLOOZHLJKWEULQH /DQGWXELQJ 1LSSOHGRZQ%23(QLSSOHXSWUHHDQGWHVWDJDLQVW%39 )UHH]HSURWHFW´[´DQQXOXVZLWKGLHVHO 6HW%39VHFXUHZHOODQGPRYHULJRII  'LVFXVVLRQRI0XGDQG&XWWLQJV'LVSRVDODQG$QQXODU'LVSRVDO Requirements of 20 AAC 25.005 (c)(14) An application for a Permit to Drill mustc be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (14) a general description of how the operator plans to dispose of drilling mud and cuttings and a statement of whether the operator intends to request authorization under 20 AAC 25.080 for an annular disposal operation in the well.;  'ULOOFXWWLQJVDQGGULOOLQJPXGIRUPWKHZHOOZLOOEHGLVSRVHGRIE\KDXOLQJWR$OSLQHLQMHFWLRQIDFLOLW\ZKHUHWKH\ ZLOOEHGLVSRVHGE\LQMHFWLQJWRDSSURYHG&ODVV,,'LVSRVDOZHOOV  $WWDFKPHQWV Attachment 1: Location Maps Attachment 2: Directional Plan Attachment 3: Drilling Hazards Summary Attachment 4: Cement Summary Attachment 5: Well Schematic  $OSLQH2IILFH                 &'ZS3ODQ6XPPDU\  'RJOHJ6HYHULW\       0HDVXUHG'HSWK [ [[ [                 $]LPXWKIURP1RUWK>ƒ@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XV IWLQ@   &'   &'  &'  &'3%     &'        &'        &'3%             &'             &'$             &'%         &'     &'     &'     &'3+   &'   &'3+     &'     &'$       &'       &'$       &'$3% 7UXH9HUWLFDO'HSWK        9HUWLFDO6HFWLRQDWƒ [ [[[   &HQWUHWR&HQWUH6HSDUDWLRQ        0HDVXUHG'HSWK '',  6859(< 352*5$0 'DWH79DOLGDWHG<HV9HUVLRQ 'HSWK)URP 'HSWK 7R 6XUYH\3ODQ 7RRO   &'ZS &' *<'*&66   &'ZS &' 0:'2:6*   &'ZS &' 0:',)56$*06   &'ZS &' 0:'2:6*   &'ZS &' 0:',)56$*06   &'ZS &' 0:'2:6*   &'ZS &' 0:',)56$*06   &'ZS &' 0:'2:6*   &'ZS &' 0:',)56$*06 &$6,1* '(7$,/6 79' 0' 1DPH   [   [   [   [ 0DJ0RGHO 'DWH %**0 2FW 0DJQHWLF1RUWKLVƒ(DVWRI7UXH1RUWK 0DJQHWLF'HFOLQDWLR 0DJ'LS )LHOG6WUHQJWK ƒ Q7 6(&7,21 '(7$,/6 6HF 0' ,QF $]L 79' 16 (: 'OHJ 7)DFH 96HFW 7DUJHW $QQRWDWLRQ                     6WDUW%XLOG           6WDUW%XLOG           6WDUW%XLOG          6WDUWKROGDW0'          6WDUW%XLOG          6WDUWKROGDW0'          6WDUWKROGDW0'          6WDUW'/67)2         6WDUWKROGDW0'         6WDUW'/67)2        6WDUWKROGDW0'         &'7JW 6WDUWKROGDW0'         6WDUW'/67)2         6WDUWKROGDW0'         6WDUW'/67)2         &'7JW 6WDUW'/67)2         6WDUWKROGDW0'         6WDUW'/67)2        &'7JW 6WDUW'/67)2        6WDUWKROGDW0'        6WDUW'/67)2        &'7JW 6WDUW'/67)2        6WDUWKROGDW0'       &'7JW 7'DW )250$7,21723'(7$,/6 79'3DWK)RUPDWLRQ %DVH3HUP  &  &  &  &  )DXOW  &  .  1DUZKDO  7RS/HIW\ %\VLJQLQJWKLV,DFNQRZOHGJHWKDW,KDYHEHHQLQIRUPHGRIDOOULVNVFKHFNHGWKDWWKHGDWDLVFRUUHFWHQVXUHGLW VFRPSOHWHQHVVDQGDOOVXUURXQGLQJZHOOVDUHDVVLJQHGWRWKHSURSHUSRVLWLRQDQG,DSSURYHWKHVF DQDQGFROOLVLRQDYRLGDQFHSODQDVVHWRXWLQWKHDXGLWSDFN,DSSURYHLWDVWKHEDVLLV IRUWKHILQDOZHOOSODQDQGZHOOVLWHGUDZLQJV,DOVRDFNQRZOHGJHWKDWXQOHVVQRWLILHGRWKHUZLVHDOOWDUJHWVKDYHDIHHWODWHUDOWROHUDQFH 3UHSDUHGE\&KHFNHGE\$FFHSWHGE\$SSURYHGE\ 3ODQ#XVIW ' 7UXH9HUWLFDO'HSWK        9HUWLFDO6HFWLRQDWƒ[[[[ƒƒƒƒƒƒƒƒƒƒ&'ZS%DVH3HUP&&&&)DXOW&.1DUZKDO7RS/HIW\&'ZS6HSWHPEHU6HFWLRQ9LHZ 6RXWK  1RUWK         :HVW  (DVW  [[[[&'ZS3ODQ9LHZWhile drilling production section, stay within 100 feet laterally of plan, unless notified otherwise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ƒ@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@     &'    &'             &'               &'               &'               &'3%                 &'                &'                &'3%             &'             &'$             &'%                  &'       &'       &'3%      &'             &'             &'             &'3+    &'   &'3+                &'               &'$            &'            &'$            &'$3% 6859(< 352*5$0 'DWH79DOLGDWHG<HV9HUVLRQ )URP 7R 7RRO   *<'*&66   0:'2:6*   0:',)56$*06   0:'2:6*   0:',)56$*06   0:'2:6*   0:',)56$*06   0:'2:6*   0:',)56$*06 &$6,1* '(7$,/6 79'0'1DPH   [   [  [   [ 6(&7,21 '(7$,/6 6HF 0' ,QF $]L 79' 16 (: 'OHJ 7)DFH 96HFW 7DUJHW $QQRWDWLRQ                     6WDUW%XLOG           6WDUW%XLOG           6WDUW%XLOG           6WDUWKROGDW0'           6WDUW%XLOG           6WDUWKROGDW0'           6WDUWKROGDW0'           6WDUW'/67)2           6WDUWKROGDW0'         6WDUW'/67)2         6WDUWKROGDW0'         &'7JW 6WDUWKROGDW0'         6WDUW'/67)2         6WDUWKROGDW0'         6WDUW'/67)2         &'7JW 6WDUW'/67)2         6WDUWKROGDW0'         6WDUW'/67)2        &'7JW 6WDUW'/67)2          6WDUWKROGDW0'         6WDUW'/67)2        &'7JW 6WDUW'/67)2        6WDUWKROGDW0'         &'7JW 7'DW ϰͲϱϵϳǁƉϬϵ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO  *<'*&66  0:'2:6*  0:',)56$*06  0:' 2:6*  0:',)56$*06  0:'2:6*  0:',)56$*06  0:'2:6*  0:',)56$*06&$6,1* '(7$,/679'0'1DPH  [  [  [  [$]LPXWKIURP1RUWK>ƒ@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@&'&'3%&'&'$&'%&'&'&'3+&'&'3+&'&'$&'$3%        )URP&RORXU7R0'ϱϰ͘ϲϬdŽϭϱϬϬ͘ϬϬ0' $]L 7)DFH                                                   ϰͲϱϵϳǁƉϬϵ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO  *<'*&66  0:'2:6*  0:',)56$*06  0:' 2:6*  0:',)56$*06  0:'2:6*  0:',)56$*06  0:'2:6*  0:',)56$*06&$6,1* '(7$,/679'0'1DPH  [  [  [  [$]LPXWKIURP1RUWK>ƒ@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@&'&'&'$&'%&'&'3+        )URP&RORXU7R0'ϭϱϬϬ͘ϬϬdŽϮϴϬϬ͘ϬϬ0' $]L 7)DFH                                                   ϰͲϱϵϳǁƉϬϵ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO  *<'*&66  0:'2:6*  0:',)56$*06  0:' 2:6*  0:',)56$*06  0:'2:6*  0:',)56$*06  0:'2:6*  0:',)56$*06&$6,1* '(7$,/679'0'1DPH  [  [  [  [$]LPXWKIURP1RUWK>ƒ@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@        )URP&RORXU7R0'ϮϳϬϬ͘ϬϬdŽϴϱϬϬ͘ϬϬ0' $]L 7)DFH                                                   ϰͲϱϵϳǁƉϬϵ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO  *<'*&66  0:'2:6*  0:',)56$*06  0:' 2:6*  0:',)56$*06  0:'2:6*  0:',)56$*06  0:'2:6*  0:',)56$*06&$6,1* '(7$,/679'0'1DPH  [  [  [  [$]LPXWKIURP1RUWK>ƒ@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@        )URP&RORXU7R0'ϴϰϬϬ͘ϬϬdŽϭϮϱϬϬ͘ϬϬ0' $]L 7)DFH                                                   ϰͲϱϵϳǁƉϬϵ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO  *<'*&66  0:'2:6*  0:',)56$*06  0:' 2:6*  0:',)56$*06  0:'2:6*  0:',)56$*06  0:'2:6*  0:',)56$*06&$6,1* '(7$,/679'0'1DPH  [  [  [  [$]LPXWKIURP1RUWK>ƒ@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@        )URP&RORXU7R0'ϭϮϰϬϬ͘ϬϬdŽϭϴϯϯϲ͘ϬϬ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´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´+ROH´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´+ROH´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´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t>>͗^d/KE͗džĐĞƐƐďĞůŽǁWĞƌŵĂĨƌŽƐƚ͗ϭ͘ϱϱϬйϭϯͲϯͬϴΗ^hZ&хdžĐĞƐƐŝŶWĞƌŵĂĨƌŽƐƚ͗ϯ͘ϱϮϱϬй>ĞĂĚĐĞŵĞŶƚLJŝĞůĚϭ͘ϵϮĨƚΔϯͬƐŬϭ͘ϭϲ ĨƚΔϯͬƐŬ ϭ͘ϵϮ ĨƚΔϯͬƐŬdĂŝůĐĞŵĞŶƚLJŝĞůĚϭ͘ϭϲĨƚΔϯͬƐŬϭϬϱ Ĩƚϭϵ͘ϲ ďďůƐϯϬϮ͘Ϭ ďďůƐϭϭϬ͘Ϭ ďďůƐϰϯϭ͘ϲďďůƐŽƌϮϰϮϯ͘ϭĨƚΔϯŽƌϭϮϲϮƐŬƐϬ͘ϭϴϲϮ >ͬ&dϬ͘Ϭϳϰϵ>ͬ&dϭϮ͘ϬďďůƐϱϲ͘Ϯ ďďůƐϬ͘ϭϰϵϳ>ͬ&dϲϴ͘ϮďďůƐŽƌϯϴϮ͘ϳĨƚΔϯŽƌϯϯϬƐŬƐϭϮϱϳ Ĩƚϯϵϳ͘ϳďďůƐϭϬϱ &dϮϲϱϲ&dϮϳϯϲ&dϱϬϬ&dϭϮϱϳ &dϮϮϯϲ&dϮϮϯϲĨƚϴϬ&dyϬ͘ϭϰϵϳ>ͬ&dсϭϮ͘Ϭ>^ϱϬϬ&dyϬ͘Ϭϳϰϵ>ͬ&dсϯϳ͘ϱ>^ϯϳ͘ϱ>^yϭ͘ϱϱϬйϱϲ͘Ϯ>^ϲϴ͘Ϯ >^ϭϬ͘ϬďďůƐϮϲϱϲ ĨƚϭϮďďůƐϮϳϯϲ Ĩƚϵϳϵ&dyϬ͘Ϭϳϰϵ>ͬ&dсϳϯ͘ϯ>^ϳϯ͘ϯ>^yϭ͘ϱϱϬйϭϭϬ͘Ϭ>^ϭϭϱϮ&dyϬ͘Ϭϳϰϵ>ͬ&dсϴϲ͘ϯ>^ϴϲ͘ϯ>^yϯ͘ϱϮϱϬйϯϬϮ͘Ϭ>^ϭϬϱ&dyϬ͘ϭϴϲϮ>ͬ&dсϭϵ͘ϲ>^ϰϯϭ͘ϲ>^Ϯϲϱϲ&dyϬ͘ϭϰϵϳ>ͬ&dсϯϵϳ͘ϳ>^ϯϵϳ͘ϳ>^ŝƐƉůĂĐĞŵĞŶƚс;ϮϳϯϲΖͲϴϬΖͿdžϬ͘ϭϰϵϳďďůͬĨƚсdŽƚĂůdĂŝůĞŵĞŶƚсϯϴϳ͘ϳdĂŝůĞŵĞŶƚLJŝĞůĚсKEhdKZс^ŚŽĞƚŽdŽƉŽĨdĂŝůс ;ϮϳϯϲΖͲϮϮϯϲΖͿdžϬ͘ϬϳϰϵďďůͬĨƚdžϭ͘ϱ;ϱϬйĞdžĐĞƐƐͿdŽƚĂů>ĞĂĚĞŵĞŶƚсϭϬϱΖdžϬ͘ϭϴϲϮďďůͬĨƚdžϭ͘Ϭ;ϬйĞdžĐĞƐƐͿĂƐĞŽĨWĞƌŵĂĨƌŽƐƚƚŽKEс ;ϭϮϱϳΖͲϭϬϱΖͿdžϬ͘ϬϳϰϵďďůͬĨƚdžϯ͘ϱ;ϮϱϬйĞdžĐĞƐƐͿWƌĞǀŝŽƵƐƐŚŽĞфϭϲΗK,ĂƐĞŽĨWĞƌŵĂĨƌŽƐƚфϭϲΗKEdŽdŽƉŽĨ&ůŽĂƚŽůůĂƌϭϲΗK,džϭϯ͘ϯϳϱΗ^'ͲĞůŽǁWĞƌŵĂĨƌŽƐƚϭϲΗK,džϭϯ͘ϯϳϱΗ^'^,KdZ<>DEdϮϬΗKEdžϭϯ͘ϯϳϱΗ^'/^W>DEddKd>sK>hDͲd/>DddKd>sK>hDͲ>DdďďůƐ sK>hD^ϭϲΗK,džϭϯ͘ϯϳϱΗ^'Ͳ/ŶWĞƌŵĂĨƌŽƐƚd/>DEdϮϱϬйK,y^^/EdZE>^ĞƚĚĞƉƚŚĞƐƚdŽƉŽĨdĂŝůdKd>sK>hDϱϬйK,y^^WZs/Kh^^,KdKWK&&>KdK>>Z^dWd,>E'd,K&d/>>E'd,K&>^K&WZD&ZK^ddŽƉŽĨ&ϰͲϱϵϳϭϯͲϯͬϴΗ^hZ&ϭϭ͘ϬƉƉŐĞĞƉZd>ĞĂĚ^ůƵƌƌLJϭϱ͘ϴƉƉŐůĂƐƐ'dĂŝů^ůƵƌƌLJ^ŚŽĞƚƌĂĐŬс ϴϬΖdžϬ͘ϭϰϵϳďďůͬĨƚdžϭ͘Ϭ;ϬйĞdžĐĞƐƐͿϭϯͲϯͬϴΗ^hZ&DEd>h>d/KE^>ĞĂĚĞŵĞŶƚLJŝĞůĚсĞƐŝŐŶ͗ϱϬϬΖŽĨϭϱ͘ϴƉƉŐdĂŝůŵƚǁŝƚŚϭϭ͘ϬƉƉŐ>ĞĂĚŵƚƚŽƐƵƌĨĂĐĞǁŝƚŚϱϬйĞdžĐĞƐƐďĞůŽǁWĞƌŵĂĨƌŽƐƚΘϮϱϬйĞdžĐĞƐƐŝŶWĞƌŵĂĨƌŽƐƚW/d/^EEh>Z^ĞƐŝŐŶ͗ϱϬϬΖŽĨϭϱ͘ϴƉƉŐdĂŝůŵƚǁŝƚŚϭϭ͘ϬƉƉŐ>ĞĂĚŵƚƚŽƐƵƌĨĂĐĞǁŝƚŚϱϬйĞdžĐĞƐƐďĞůŽǁWĞƌŵĂĨƌŽƐƚΘϮϱϬйĞdžĐĞƐƐŝŶWĞƌŵĂĨƌŽƐƚƚŵŽĨ>ĞĂĚƚŽĂƐĞŽĨWĞƌŵĂĨƌŽƐƚс ;ϮϮϯϲΖͲϭϮϱϳΖͿdžϬ͘ϬϳϰϵďďůͬĨƚdžϭ͘ϱ;ϱϬйĞdžĐĞƐƐͿWd,^ϮϬΗKEdžϭϯ͘ϯϳϱΗсϭϲΗK,džϭϯ͘ϯϳϱΗсEŽŵŝŶĂůϭϯ͘ϯϳϱΗϲϴηсϱϲ͘ϮďďůƐ t>>͗^d/KE͗džĐĞƐƐƉůĂŶŶĞĚ͗ ϭ͘ϰϰϬйĞŵĞŶƚLJŝĞůĚ ϭ͘ϭϲĨƚΔϯͬƐŬϭ͘ϭϲ ĨƚΔϯͬƐŬϵ͘ϭ ďďůƐфϵϱͬϴΗ/Ed/ϭϯϮ͘ϴ ďďůƐϮϳϯϲ Ĩƚϭϰϭ͘ϵďďůƐŽƌϳϵϲ͘ϵĨƚΔϯŽƌϲϴϳƐŬƐфϭϮϭͬϰΗK,ϲϯϬ͘ϲďďůƐϬ͘Ϭϱϵϳ >ͬ&dϬ͘Ϭϱϱϴ>ͬ&dϬ͘ϬϬϬϬ>ͬ&dϬ͘Ϭϳϱϴ >ͬ&dϮϳϯϲ &dϴϯϭϲ &dϴϰϯϲ &dϭϳϬϭ &dϱϱϳϬ Ĩƚϲϳϯϱ &dϱϲϱϵ Ĩƚϲϳϯϱ ĨƚϭϮϬ &dy Ϭ͘Ϭϳϱϴ >ͬ&dс ϵ͘ϭ >^ϭϳϬϭ &dy Ϭ͘Ϭϱϱϴ >ͬ&dс ϵϰ͘ϵ >^ϵϰ͘ϵ >^y ϭ͘ϰ ϰϬй ϭϯϮ͘ϴ >^ϭϰϭ͘ϵ >^ϴϯϭϲ Ĩƚϴϯϭϲ &dy Ϭ͘Ϭϳϱϴ >ͬ&dс ϲϯϬ͘ϲ >^ϴϰϯϲ ĨƚϲϯϬ͘ϲ>^dKd>sK>hDϭϯϮ͘ϴďďůƐ^ƵƌĨĂĐĞdŽdŽƉŽĨ&ůŽĂƚŽůůĂƌdKd>sK>hDĞƐƚdK/^W>DEdϵ͘ϭďďůƐϭϮ͘ϮϱΗK,džϵ͘ϲϮϱΗ^'ďďůƐ ĞƐƚdK&tWZs/Kh^^,Kс^dWd,сDEd&>KdK>>ZсϰϬйK,y^^ĞƐŝƌĞĚdK;ϮϱϬΖdsĂďŽǀĞƐŚŽĞĐĂůĐƵůĂƚĞĚͿс&ůŽĂƚĐŽůůĂƌ^ĞƚĚĞƉƚŚ&/>>K&DEdс^,KdZ<sK>hD^ĞƐƚdKDWϲϬďďůƐϱďďůƐdŽƚĂůĞŵĞŶƚsŽůƵŵĞсϭϯͲϯͬϴΗ^'džϵͲϱͬϴΗ^'сŝƐƉůĂĐĞŵĞŶƚс ϴϯϭϲΖdžϬ͘ϬϳϱϴďďůͬĨƚс ϲϯϬ͘ϲ EŽŵŝŶĂůϵϱͬϴΗϰϬη^'сWd,^EEh>Z^ϭϮͲϭͬϰΗK,džϵͲϱͬϴΗ^'с/EdZE>EŽŵŝŶĂůϱϳͬϴΗϮϲ͘ϯηWсϰͲϱϵϳϵͲϱͬϴΗ/Ed/ϵͲϱͬϴΗ/ŶƚĞƌŵĞĚŝĂƚĞ/ĞŵĞŶƚĂůĐƵůĂƚŝŽŶƐϭϯϯͬϴΗ^hZ&хĞƐŝŐŶ͗ůĂƐƐ'ϭϱ͘ϴƉƉŐĞŵĞŶƚƚŽϮϱϬΖdsĂďŽǀĞƐŚŽĞƐĞƚĚĞƉƚŚ͘ĞŵĞŶƚLJŝĞůĚс WůĂŶŶĞĚdKс ϲϳϯϱΖDĞƐŝŐŶ͗ůĂƐƐ'ϭϱ͘ϴƉƉŐĞŵĞŶƚƚŽϮϱϬΖdsĂďŽǀĞƐŚŽĞƐĞƚĚĞƉƚŚ͘^ŚŽĞdƌĂĐŬ ϭϮϬΖdžϬ͘ϬϳϱϴďďůͬĨƚdžϭ͘Ϭ;ϬйĞdžĐĞƐƐͿW/d/^WƌĞǀŝŽƵƐƐŚŽĞϭϮͲϭͬϰΗdžϵͲϱͬϴΗŶŶƵůƵƐс ;ϴϰϯϲΖͲϲϳϯϱΖͿdžϬ͘ϬϱϱϴďďůͬĨƚdžϭ͘ϰ;ϰϬйĞdžĐĞƐƐͿ t>>͗^d/KE͗džĐĞƐƐƉůĂŶŶĞĚ͗ϭ͘ϯϯϬйфϰΗW>ĞĂĚĞŵĞŶƚLJŝĞůĚϭ͘ϵϲĨƚΔϯͬƐŬdĂŝůĞŵĞŶƚLJŝĞůĚϭ͘ϭϲĨƚΔϯͬƐŬϭ͘ϭϲĨƚΔϯͬƐŬϭ͘ϵϲĨƚΔϯͬƐŬϬĨƚϴϱ͘ϲ ďďůƐϴϱ͘ϲďďůƐŽƌϰϴϬ͘ϴĨƚΔϯŽƌϮϰϱƐŬƐϰ͘ϲ ďďůƐϵϱͬϴΗ/Ed/хϭϳ͘ϰ ďďůƐϬ͘ϬϲϬϯ>ͬ&dϮϮďďůƐŽƌϭϮϯ͘ϱĨƚΔϯŽƌϭϬϲƐŬƐϬ͘ϬϮϴϮ >ͬ&dϮϰϲ͘ϬďďůƐϬ͘ϬϮϲϴ>ͬ&dфϳΗ/Ed//Ϭ͘ϬϭϬϴ>ͬ&dϬ͘Ϭϯϴϯ>ͬ&dϴϰϯϲĨƚфϴϯͬϰΗK,ϴϰϯϲ&dϴϮϴϲ&dϭϮϯϲϵ&dϳϴϰϴĨƚϭϮϰϴϵ&dϴϬϯϱĨƚϱϬϬ&dϮϰϲϬ&dϵϱϮϵ&dϵϱϮϵĨƚϮϰϲϬ&dyϬ͘ϬϮϲϴ>ͬ&dсϲϱ͘ϵ>^ϲϱ͘ϵ>^yϭ͘ϯϯϬйϴϱ͘ϲ>^фϴϯͬϰΗK,ϴϱ͘ϲ >^ϭϮϯϲϵ ĨƚϭϮϰϴϵĨƚϭϮϬ&dyϬ͘Ϭϯϴϯ>ͬ&dсϰ͘ϲ>^ϱϬϬ&dyϬ͘ϬϮϲϴ>ͬ&dсϭϯ͘ϰ>^ϭϯ͘ϰ>^yϭ͘ϯϯϬйϭϳ͘ϰ>^ϮϮ͘Ϭ>^ϭϬϳ͘ϲ >^ϴϮϴϲ &dy Ϭ͘ϬϭϬϴ >ͬ&dс ϴϵ͘ϴ >^ϰϬϴϯ&dyϬ͘Ϭϯϴϯ>ͬ&dсϭϱϲ͘Ϯ>^Ϯϰϲ͘Ϭ>^ŝƐƉůĂĐĞŵĞŶƚс;ϭϮϯϲϵΖͲϴϮϴϲΖͿdžϬ͘ϬϯϴϯďďůͬĨƚнϴϮϴϲΖdžϬ͘ϬϭϬϴďďůͬĨƚсϭϱ͘ϴƉƉŐůĂƐƐ'dĂŝů^ůƵƌƌLJ^ŚŽĞƚƌĂĐŬс ϭϮϬΖdžϬ͘ϬϯϴϯďďůͬĨƚdžϭ͘Ϭ;ϬйĞdžĐĞƐƐͿ^ŚŽĞƚŽdŽƉŽĨdĂŝůс ϱϬϬΖdžϬ͘ϬϮϲϴďďůͬĨƚdžϭ͘ϯ;ϯϬйĞdžĐĞƐƐͿdŽƚĂůdĂŝůĞŵĞŶƚсĨƚϴϮϴϲdŽƉŽĨϳΗ>ŝŶĞƌ,ĂŶŐĞƌWƌĞǀŝŽƵƐƐŚŽĞĞƐƚdK&tWZs/Kh^^,Kсϴ͘ϳϱΗK,džϳΗ^'>DEd^,KdZ<d/>DEdsK>hD^ĞƐŝƌĞĚdK;ϮϱϬΖdsĂďŽǀĞƐŚŽĞĐĂůĐƵůĂƚĞĚͿс>E'd,K&>с^dWd,с>E'd,K&d/>сdKd>>sK>hD&>KdK>>ZсdKWϳΗ>/EZсϰϬďďůƐĞƐƚdKdKd>DEdsK>hDϴ͘ϳϱΗK,džϳΗ^'/^W>DEddŽdŽƉŽĨdŽƉ>ŝŶĞƌ,ĂŶŐĞƌ>ŝŶĞƌ,ĂŶŐĞƌdŽdŽƉŽĨ&ůŽĂƚŽůůĂƌdKd>sK>hDdKd>d/>sK>hDϭϳ͘ϰďďůƐϴϱ͘ϲďďůƐEŽŵŝŶĂůϳΗϮϲη^'сWd,^ϵͲϱͬϴΗ^'džϳΗ^'с/EdZE>dŽƉŽĨϵͲϱͬϴΗ>ŝŶĞƌ,ĂŶŐĞƌϯϬйK,džĐĞƐƐ ϰ͘ϲďďůƐ^ĞƚĚĞƉƚŚďďůƐϰϳϯ͘ϯ &ůŽĂƚĐŽůůĂƌϱďďůƐĞƐƚdKDWEEh>Z^ϵͲϱͬϴΗ^'džϰΗWсϴͲϯͬϰΗK,džϳΗ^'сEŽŵŝŶĂůϰΗϭϰηWсϰͲϱϵϳϳΗ/Ed//ϳΗ/ŶƚĞƌŵĞĚŝĂƚĞ//ĞŵĞŶƚĂůĐƵůĂƚŝŽŶƐϭϯϯͬϴΗ^hZ&хdĂŝůĞŵĞŶƚLJŝĞůĚс>ĞĂĚĞŵĞŶƚLJŝĞůĚсĞƐŝŐŶ͗ϭϯƉƉŐĞdžƚĞŶĚĞĚůĞĂĚǁŝƚŚϱϬϬΖϭϱ͘ϴƉƉŐĐůĂƐƐ'ƚĂŝůƚŽϭϱϬϬΖDĂďŽǀĞ<ϯŵĂƌŬĞƌ͘W/d/^dŽƚĂů>ĞĂĚĞŵĞŶƚсĞƐŝŐŶ͗ϭϯƉƉŐĞdžƚĞŶĚĞĚůĞĂĚǁŝƚŚϱϬϬΖϭϱ͘ϴƉƉŐĐůĂƐƐ'ƚĂŝůƚŽϭϱϬϬΖDĂďŽǀĞ<ϯŵĂƌŬĞƌ͘ϭϯƉƉŐdžƚĞŶĚĞĚ>ĞĂĚ^ůƵƌƌLJϴͲϯͬϰΗdžϳΗŶŶƵůƵƐс ;ϭϮϰϴϵΖͲϵϱϮϵΖͲϱϬϬΖͿdžϬ͘ϬϮϲϴďďůͬĨƚdžϭ͘ϯ;ϯϬйĞdžĐĞƐƐͿ ϰͲϱϵϳ ,ŽƌŝnjŽŶƚĂůEĂƌǁŚĂů^ĂŶĚ/ŶũĞĐƚŽƌ tĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ ^ƵƌĨĂĐĞĂƐŝŶŐ͗ ϭϯͲϯͬϴΗϲϴη>ͲϴϬ,zϱϲϯ Ϯ͕ϳϯϲ͛DͬϮ͕ϰϬϮΖdsZ< ϱϱĚĞŐ/ŶĐ ŽŶĚƵĐƚŽƌ/ŶƐƚĂůůĞĚ͗ ϮϬΗƐĞƚΛϭϮϬΖDͬds WƌŽĚƵĐƚŝŽŶ>ŝŶĞƌ͗ ϰͲϭͬϮΗϭϮ͘ϲη>ͲϴϬ,zϱϲϯ ϭϮ͕ϯϯϴΖͲϭϴ͕ϯϯϮΖD /ŶƚĞƌŵĞĚŝĂƚĞϭ͗ ϵϱͬϴΗϰϬη͕>ϴϬ͕dyWD ^ĞƚĂƚϴ͕ϰϯϲΖDͬϯ͕ϰϳϵΖdsZ< ϴϮĚĞŐ/ŶĐ dƵďŝŶŐ͗ ϰͲЪ͟ϭϮ͘ϲη>ͲϴϬ,zϱϲϯ dŽϭϮ͕ϯϯϴΖD ϭϮͲϭͬϰΗ/ŶƚĞƌŵĞĚŝĂƚĞϭ,ŽůĞ ϲͲϭͬϴΗWƌŽĚƵĐƚŝŽŶ,ŽůĞ ϭϲΗ^ƵƌĨĂĐĞ,ŽůĞ EĂƌǁŚĂů>ĞĨƚLJ^ĂŶĚdŽƉ͗ ϭϮ͕ϵϴϵΖDͬϰ͕ϭϰϰΖds /ŶƚĞƌŵĞĚŝĂƚĞϮ͗ ϳΗϮϲη͕>ϴϬ͕dyWDĂƚϭϮ͕ϰϴϵΖDͬϰ͕ϬϳϭΖdsZ< ϳΗdžϵϱͬϴΗ>ŝŶĞƌŚĂŶŐĞƌĂƚϴ͕Ϯϴϲ͛D /ŶƚϭdKΛϲ͕ϳϯϱΖDͬϯ͕ϮϮϵΖdsZ< ϮϱϬΖdsĂďŽǀĞĐĂƐŝŶŐƐŚŽĞ &DŝŐŽƌĞtĞůů,ĞĂĚ >ĂƐƚhƉĚĂƚĞ͗ϮͬϭϰͬϮϬϮϮ ǁƉϬϵ ŽLJŽŶϮϲZ<сϳϯ͘ϰΖ '+* /ŶƚϮdK ƚϵ͕ϱϮϵΖDͬϯ͕ϲϯϵΖdsZ< ϭϱϬϬΖDĂďŽǀĞ<ϯƚŽƉ <Ͳϯ^ĂŶĚdŽƉ͗ ϭϭ͕ϬϮϵΖDͬϯ͕ϴϱϴΖds EĂƌǁŚĂůĞŶƚƌĂů^ĂŶĚdŽƉ͗ ϭϮ͕ϱϵϲΖDͬϰ͕ϬϴϳΖds ò´6LOYHU%XOOHW6KRH ϯ͘ϳϱΗ ϯ͘ϴϭϯΗyDh ϯ͘ϴϭϯΗyEŝƉƉůĞ ϴͲϯͬϰ͟/ŶƚĞƌŵĞĚŝĂƚĞϮ,ŽůĞ WƌŽĚƵĐƚŝŽŶd͗ цϭϴ͕ϯϯϱΖDͬϰ͕ϯϱϰΖds ϰͲϭͬϮ͟džϳΗyW>ŝŶĞƌdŽƉWĂĐŬĞƌϭϮ͕ϯϯϴΖD ϰͲϭͬϮ͟džϳΗĂŬĞƌ&ůĞdž>ŽĐŬ>ŝŶĞƌŚĂŶŐĞƌ ƌŝůWůĞdžtD ϭϬƉƉŐ >^EtD ϭϭƉƉŐ >^EtD ϵ͘ϮƉƉŐ sĞƌƐĂWƌŽKD ϴ͘ϮƉƉŐ ŝĞƐĞů ϲ͘ϴƉƉŐ ΕϮϬϬϬΖds '>D'>D '>D ƌŝŶĞ ϵ͘ϮƉƉŐ ϯ͘ϱϲϮΗ ĂŬĞƌ,LJĚƌŽƚƌŝƉ WĞƌĨ:ŽŝŶƚƐ CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Guo, Haibin To:Loepp, Victoria T (OGC) Cc:Strumness, Laura A;Macdonald, Justin D Subject:RE: [EXTERNAL]CRU CD4-597(PTD 222-019) C10 Halo Date:Tuesday, March 29, 2022 3:54:23 PM Attachments:CD4-597_PTD_Follow-Up_Questions.pdf Hi Victoria, Attached is the offset wells logs and interpretation for CD4-597. Qannik reservoir is not present on CD4-597 CD4-597 C10 doesn’t have Halo sand If you have any questions on the logs/interpretation, please feel free to let Laura, Geologist as attached, or me know. Thanks, Haibin Guo ERD Drilling Engineer ConocoPhillips Alaska Office: 907.265.1487 Cell: 907.227.6048 From: Loepp, Victoria T (OGC) <victoria.loepp@alaska.gov> Sent: Wednesday, March 23, 2022 9:55 AM To: Guo, Haibin <Haibin.Guo@conocophillips.com> Subject: [EXTERNAL]CRU CD4-597(PTD 222-019) C10 Halo CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Haibin, Please provide an assessment of the C10(Halo) and the Qannik at/near this proposed location: log, thickness, pay, cutoffs, producibility and any other relevant information. Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria.Loepp@alaska.gov CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov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ompanyConocoPhillips Alaska, Inc.Well Name:COLVILLE RIV UNIT CD4-597Initial Class/TypeSER / PENDGeoArea890Unit50360On/Off ShoreOnProgramSERField & PoolWell bore segAnnular DisposalPTD#:2220190COLVILLE RIVER, NARWHL UND OIL - 120176NA1Permit fee attachedYes2Lease number appropriateYes3Unique well name and numberNoNarwhal Pool is Undefined.4Well located in a defined poolYes5Well located proper distance from drilling unit boundaryYes6Well located proper distance from other wellsYes7Sufficient acreage available in drilling unitYes8If deviated, is wellbore plat includedYes9Operator only affected partyYes10Operator has appropriate bond in forceYes11Permit can be issued without conservation orderYes12Permit can be issued without administrative approvalYes13Can permit be approved before 15-day waitYesERIO 6 applies to Narwhal sands, WINJ is approved WAG injection is not.14Well located within area and strata authorized by Injection Order # (put IO# in comments) (ForYes15All wells within 1/4 mile area of review identified (For service well only)YesWell will be pre-produced for 30-60 days to clean it up before injection.16Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)Yes18Conductor string providedYes19Surface casing protects all known USDWsYes310% excess planned20CMT vol adequate to circulate on conductor & surf csgNo21CMT vol adequate to tie-in long string to surf csgNoProductive interval will be completed with uncemented production liner with perf joints22CMT will cover all known productive horizonsYes23Casing designs adequate for C, T, B & permafrostYesRig has steel tanks; all waste to approved disposal wells24Adequate tankage or reserve pitNA25If a re-drill, has a 10-403 for abandonment been approvedYesAnti-collision analysis complete; no major risk failures26Adequate wellbore separation proposedYesDiverter waiver granted per 20 AAC 25.035(h)(2)27If diverter required, does it meet regulationsYesMax formation pressure is 1850 psi(8.6 ppg EMW); will drill w/ 10 ppg EMW28Drilling fluid program schematic & equip list adequateYesSince MPSP is <3000 psig only one fixed and one variable ram required29BOPEs, do they meet regulationYesMPSP is 1449 psig; will test BOPs to 3500 psig30BOPE press rating appropriate; test to (put psig in comments)Yes31Choke manifold complies w/API RP-53 (May 84)Yes32Work will occur without operation shutdownNo33Is presence of H2S gas probableYesno wells within the AOR34Mechanical condition of wells within AOR verified (For service well only)YesNone expected based on numerous wells drilled from CD4-Pad.35Permit can be issued w/o hydrogen sulfide measuresYes36Data presented on potential overpressure zonesNA37Seismic analysis of shallow gas zonesNA38Seabed condition survey (if off-shore)NA39Contact name/phone for weekly progress reports [exploratory only]ApprDLBDate2/28/2022ApprVTLDate3/1/2022ApprDLBDate2/28/2022AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDate-03JLC 4/4/2022