Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout184-183 • WELL LOG TRANSMIITAL II. DATA LOGGED Co/Co/2017 PROACTIVE DIAGNOSTIC SERVICES, INC. id. K.BENDER RECEWED To: AOGCC MAY 2 5 2017 Makana Bender 333 West 7th Avenue AOGCC Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: ProActive Diagnostic Services, Inc. Attn: Ryan C. Rupe 130 West International Airport Road Suite C Anchorage,AK 99518 Fax: (907)245-8952 sums JUN 0 9 2201. 1) Caliper Report 10-May-17 1L-15 Report/CD 50-029-21204-00 2) Signed : M4) o_ed.c.eat Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAx: (907)245-8952 E-MAIL: PDSANCHORAGE( MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D:\A chives\MasterT emp l ateFi I es\Templ ates\Distribution\TransmittalSheets\Cono coPhi I l ips_Trans mi t.docx \ G-4- kc6s tECEIVED 22K 2. � MAY 2 5 2017 Memory Multi-Finger Caliper Ill WI) AOGCC Log Results Summary Company: ConocoPhillips Alaska, Inc. Well: 1L-15 Log Date: May 10, 2017 Field: Kuparuk Log No.: 12433 State: Alaska Run No.: 1 API No. 50-029-21204-00 Pipe Description: 3.5 inch 9.3 lb. L-80 EUE 8RD MOD Top Log Interval: Surface Pipe Use: Tubing Bottom Log Interval: 6,325 Ft. (MD) Inspection Type : Corrosive & Mechanical Damage Inspection COMMENTS : This caliper data is tied into the top of the GX Nipple at 6,321.8 feet(Driller's Depth). This log was run to assess the condition of the tubing with respect to internal corrosive and mechanical damage. The caliper recordings indicate the 3.5 inch tubing logged appears to be in good to fair condition, with a maximum recorded wall penetration of 21% in a line of pits in pup joint 1.1 (80 ft). Other recorded damage appears as isolated pitting and general corrosion. No significant areas of cross-sectional wall loss are recorded throughout the tubing logged. The caliper recordings indicate a deposit in pup joint 156.1 (5,064 ft), restricting the I.D. to 2.72 inches. No other significant I.D. restrictions are recorded throughout the tubing logged. A graph illustrating minimum recorded diameters on a joint-by-joint basis across the tubing logged is included in this report. MAXIMUM RECORDED WALL PENETRATIONS : ( .,,>r rid ticr3 Percent i11 Put t et,atiox, i„ri;: Line of Pits 21 1.1 80 Ft. (MD) Corrosion 21 108.3 3,513 Ft. (MD) Isolated Pitting 21 156.3 5,077 Ft. (MD) No other significant wall penetrations(> 17%) are recorded throughout the tubing logged. MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS: No significant areas of cross-sectional wall loss (>4%) are recorded throughout the tubing logged. MAXIMUM RECORDED ID RESTRICTIONS : D(-c,,,piiori MinIm.um Recoiled Dtaiceer Deposits 2.72 inches 156.1 5,064 Ft. (MD) No other significant I.D. restrictions are recorded throughout the tubing logged. D. Sparks C. Waldrop T. Wiese !.,,sneers) ProActive Diagnostic Services, Inc. / P.O. Box 1369, Stafford, TX 77497 Phone: (281) 431-7100 or (888) 565-9085 Fax: (281) 431-7125 E-mail: PDSAnalysis@memorylog.com Prudhoe Bay Field Office Phone: (907) 659-2307 Fax: (907) 659-2314 • • Correlation of Recorded Damage to Borehole Profile a Pipe 1 3.5 in (38.4'-6,324.6') Well: 1L-15 Field: Kuparuk Company: ConocoPhillips Alaska,Inc. Country: USA Survey Date: May 10, 2017 ■ Approx.Tool Deviation ■ Approx. Borehole Profile 1 41 25 819 50 } 1,606 GLM 1 75 -- 2,392 100 3,207 - GLM 2 § -- 125 4,023 0 GLM 3 150 4,836 GLM 4 GLM 5 175 5,679 GLM 6 GLM 7 GLM 8 188.9 6,323 0 50 100 Damage Profile(%wall)/Tool Deviation (degrees) Bottom of Survey=1 88.9 • • Minimum Diameter Profile Well: 1L-15 Survey Date: May 10,2017 Field: Kuparuk Tool Type: UW MFC 24 No.211387 Company: ConocoPhillips Alaska, Inc. Tool Size: 1.69 inches Country: USA Tubing I.D.: 2.992 inches Minimum Measured Diameters (in.) 1.75 2 2.25 2.5 2.75 0.1 ' ' - - - -38 7 253 17 568 27 882 37 1,197 47 1,513 57 1,827 67 2,142 75.2 2,434 84 2,705 94 3,019 GJ 104 3,333 111 3,583 Com., 121 3,897 131 4,212 138 4,461 148 4,774 156.2 5,065 165 5,337 172.3 5,606 182 5,899 184.5 6,066 186.2 6,195 188.7 k 6,319 • • k... PDS Report Overview �, Body Region Analysis Well: 1L-15 Survey Date: May 10,2017 Field: Kuparuk Tool Type: UW MFC 24 No.211387 Company: ConocoPhillips Alaska,Inc. Tool Size: 1.69 inches Country: USA No. of Fingers: 24 Pipe 3.5 in. 9.3 ppf L-80 EUE 8RD MOD Analyst: C.Waldrop Pipe Nom.OD Weight Grade&Thread Nom.ID Top Depth Bottom Depth 3.5 in. 9.3 ppf L-80 EUE 8RD MOD 2.992 in. 38 ft. 6,325 ft. Penetration(%wall) Damage Profile(%wall) 250 InIN Penetration body NEN Metal loss body 0 50 100 0.1 _ 200 200 150 100 50 47 0 0 to 20 to 40 to over — 20% 40% 85% 85% GLM 1 , Number of joints analyzed(total=216) 213 3 0 0 = 94 Damage Configuration(body) GLM 2 10 _. _. 8 GLM 3 (8:00) 138 6 - 4 GLM4(7:00) 2 GLM 5 (1:00) 0 Isolated General Line Other Hole/ GLM 6(1:00) 182 Pitting Corrosion Corrosion Damage Pos.Hole EEM 87 f io°8b) Number of joints damaged(total=9) 3 1 5 0 0 Bottom of Survey= 188.9 III PDS Report Joint Tabulation Sheet Well: 1L-15 Survey Date: May 10, 2017 Field: Kuparuk Analyst: C.Waldrop Company: ConocoPhillips Alaska,Inc. Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 3.5 in. 9.3 ppf L-80 EUE 8RD MOD Tubing 2.992 in. 0.254 in. 38 ft. 6,325 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) (in.) (in.) % (in.) 0 50 100 0.1 38 0 0.03 12 1 2.93 Pup 1 41 0 0.03 10 2 2.94 • 1.1 73 0 0.05 21 3 2.92 Pup Line of Pits. Lt.Deposits. 1.2 83 0 0.03 11 3 2.93 Pup Lt. Deposits. 1.3 91 0 0.03 13 4 2.92 Pup Lt. Deposits. 2 96 0 0.03 12 2 2.95 3 127 0 0.02 6 1 2.95 4 159 0 0.02 6 1 2.95 5 190 0 0.02 6 1 2.95 la 6 222 0 0.02 6 1 2.94 0 7 253 0 0.02 6 2 2.94 8 285 0 0.02 9 2 2.94 • 9 316 0 0.02 6 1 2.94 I 10 348 0 0.01 6 1 2.94 C 11 379 0 0.02 7 2 2.94 12 411 0 0.02 7 2 2.94 13 442 0 0.03 11 2 2.95 • 14 473 0 0.02 7 2 2.94 0 15 505 0 0.02 9 2 2.95 16 536 0 0.02 8 2 2.94 17 568 0 0.02 6 2 2.94 18 599 0 0.02 8 2 2.94 • 19 631 0 0.02 8 3 2.93 Lt.Deposits. ` 20 662 0 0.02 6 1 2.94 21 693 0 0.02 6 2 2.94 0 22 725 0 0.02 8 2 2.95 • 23 756 0 0.03 11 2 2.94 r 24 788 0 0.02 7 2 2.95 is 25 819 0 0.02 7 2 2.94 • 26 851 0 0.02 7 2 2.95 27 882 0 0.03 12 2 2.94 28 914 0 0.02 7 2 2.95 U 29 945 0 0.02 7 2 2.93 Lt.Deposits. • 30 977 0 0.01 6 2 2.94 31 1008 0 0.02 7 2 2.94 32 1040 0 0.03 10 2 2.95 • 33 1071 0 0.02 9 2 2.95 • 34 1103 0 0.02 8 2 2.95 C 35 1134 0 0.02 6 1 2.94 36 1166 0 0.02 8 2 2.95 37 1197 0 0.03 10 2 2.94 38 1229 0 0.02 8 2 2.94 is 39 1260 0 0.02 7 2 2.94 U 40 1292 0 0.02 6 2 2.95 41 1323 0 0.02 6 2 2.95 0 42 1355 0 0.02 7 2 2.94 U 43 1386 0 0.02 9 2 2.95 • 44 1418 0 0.02 7 2 2.94 2 45 1449 0 0.02 8 2 2.94 • 46 1481 0 0.02 7 2 2.95 r IPenetration Body Metal Loss Body Page 1 • • 11111 l_i 110 PDS Report joint Tabulation Sheet Well: 1 L-15 Survey Date: May 10, 2017 Field: Kuparuk Analyst: C.Waldrop Company: ConocoPhillips Alaska,Inc. Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 3.5 in. 9.3 ppf L-80 EUE 8RD MOD Tubing 2.992 in. 0.254 in. 38 ft. 6,325 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) (in.) (in.) % (in.) 0 50 100 47 1513 0 0.02 7 2 2.94 V 48 1543 0 0.02 7 1 2.95 49 1575 0 0.01 5 2 2.95 50 1606 0 0.02 8 2 2.95 M 51 1638 0 0.02 7 2 2.95 • 52 1669 0 0.02 8 2 2.95 • 53 1701 0 0.02 7 2 2.94 • 54 1732 0 0.02 7 1 2.95 I 55 1764 0 0.02 7 2 2.94 56 1795 0 0.02 7 2 2.95 57 1827 0 0.02 7 2 2.95 58 1859 0 0.02 7 1 2.95 I 59 1890 0 0.02 6 1 2.94 II 60 1922 0 0.02 8 2 2.95 IN 61 1953 0 0.02 6 2 2.95 I 62 1985 0 0.02 7 2 2.95 II 63 2016 0 0.02 6 2 2.95 64 2048 0 0.02 6 2 2.94 1 65 2079 0 0.02 6 1 2.94 66 2110 0 0.02 8 2 2.94 • 67 2142 0 0.02 7 2 2.94 1 68 2173 0 0.02 6 1 2.95 ii 69 2205 0 0.01 5 2 2.95 1 70 2235 0 0.02 7 2 2.95 • 71 2266 0 0.02 9 2 2.95 1 72 2298 0 0.02 6 2 2.95 N 73 2329 0 0.02 7 2 2.95 II 74 2361 0 0.02 7 2 2.94 75 2392 0 0.02 6 2 2.95 i 75.1 2424 0 0.04 14 2 2.92 Pup Lt. Deposits. to 75.2 2434 0 0 0 0 2.90 GLM 1 (NO DEVIATION) 75.3 2443 0 0.03 11 2 2.94 Pup El 76 2453 0 0.02 8 2 2.95 II 77 2485 0 0.02 7 1 2.95 II 78 2516 0 0.02 7 2 2.94 1 79 2547 0 0.02 9 2 2.94 • 80 2579 0 0.02 7 2 2.95 81 2610 0 0.02 7 2 2.95 II 82 2642 0 0.02 7 1 2.95 1 83 2673 0 0.02 6 2 2.94 II 84 2705 0 0.02 9 2 2.94 85 2736 0 0.02 7 1 2.95 86 2768 0 0.02 6 2 2.95 • 87 2799 0 0.02 9 2 2.94 • 88 2831 0 0.02 7 1 2.95 U 89 2862 0 0.02 7 1 2.94 • 90 2894 0 0.01 6 1 2.94 91 2925 0 0.02 6 2 2.95 92 2956 0 0.02 6 2 2.95 II 93 2988 0 0.02 7 2 2.94 • IPenetration Body Metal Loss Body • Page 2 • • PDS Report Joint Tabulation Sheet Well: 1 L-15 Survey Date: May 10, 2017 Field: Kuparuk Analyst: C.Waldrop Company: ConocoPhillips Alaska,Inc. Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 3.5 in. 9.3 ppf L-80 EUE 8RD MOD Tubing 2.992 in. 0.254 in. 38 ft. 6,325 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) (in.) (in.) % (in.) 0 50 100 94 3019 0 0.02 7 2 2.95 • 95 3051 0 0.02 7 2 2.94 • 96 3082 0 0.02 8 2 2.95 • 97 3114 0 0.02 8 2 2.94 • 98 3145 0 0.02 8 2 2.94 • 99 3176 0 0.02 7 2 2.95 • 100 3207 0 0.02 7 2 2.95 • 101 3239 0 0.03 10 2 2.95 • 102 3270 0 0.02 8 2 2.95 • 103 3302 0 0.03 10 2 2.94 104 3333 0 0.02 8 2 2.94 105 3365 0 0.02 7 2 2.95 106 3396 0 0.02 7 1 2.95 • 107 3428 0 0.02 7 2 2.95 108 3459 0 0.02 8 2 2.95 h 108.1 3491 0.05 0.04 16 3 2.91 Pup Shallow Pitting. Lt.Deposits. r 108.2 3501 0 0 0 0 2.89 GLM 2(NO DEVIATION) 108.3 3510 0 0.05 21 3 2.93 Pup Corrosion.Lt. Deposits. 109 3520 0 0.02 6 2 2.95 110 3552 0 0.02 8 2 2.95 U 111 3583 0 0.02 6 2 2.95 • 112 3615 0 0.02 6 2 2.94 113 3646 0 0.02 7 2 2.94 114 3678 0 0.03 10 2 2.95 115 3709 0 0.02 7 2 2.95 116 3741 0 0.02 7 2 2.94 117 3772 0 0.02 7 2 2.95 • 118 3804 0 0.02 8 1 2.93 Lt.Deposits. • 119 3835 0 0.02 8 2 2.95 120 3866 0 0.02 7 1 2.95 • 121 3897 0 0.02 6 2 2.95 • 122 3929 0 0.02 7 2 2.94 • 123 3960 0 0.02 6 2 2.95 124 3992 0 0.03 12 2 2.94 125 4023 0 0.02 7 2 2.95 126 4055 0 0.02 7 1 2.95 127 4086 0 0.02 9 2 2.94 • 128 4117 0 0.02 8 2 2.94 • 129 4149 0 0.02 7 2 2.95 130 4180 0 0.02 9 1 2.95 • 131 4212 0 0.02 8 2 2.95 11 132 4243 0 0.02 7 1 2.95 U 133 4274 0 0.02 8 1 2.95 • 134 4306 0 0.02 9 2 2.95 • 135 4337 0 0.02 7 2 2.95 U 135.1 4369 0 0.03 12 2 2.93 Pup Lt. Deposits. 135.2 4379 0 0 0 0 2.90 GLM 3(LATCH @ 8:00) 135.3 4388 0 0.04 15 2 2.93 Pup Shallow Line of Pits.Lt. Deposits. 136 4398 0 0.03 12 2 2.94 137 4429 0 0.02 7 2 2.95 • IPenetration Body Metal Loss Body Page 3 • • 1111 ct.. PDS Report Joint Tabulation Sheet Well: 1L-15 Survey Date: May 10, 2017 Field: Kuparuk Analyst: C.Waldrop Company: ConocoPhillips Alaska,Inc. Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 3.5 in. 9.3 ppf L-80 EUE 8RD MOD Tubing 2.992 in. 0.254 in. 38 ft. 6,325 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) (in.) (in.) % (in.) 0 50 100 138 4461 0 0.02 7 1 2.95 • 139 4492 0 0.02 9 2 2.95 • 140 4524 0 0.02 7 2 2.94 • 141 4555 0 0.02 9 2 2.95 142 4587 0 0.02 8 2 2.95 au 143 4618 0 0.02 9 2 2.95 • 144 4649 0 0.02 9 2 2.95 • 145 4681 0 0.02 7 1 2.94 l 146 4712 0 0.02 7 2 2.95 • 147 4744 0 0.02 9 2 2.95 • 148 4774 0 0.02 6 2 2.94 1 149 4805 0 0.02 7 1 2.95 C 150 4836 0 0.02 7 2 2.95 151 4867 0 0.02 6 2 2.95 1 152 4898 0 0.02 7 1 2.95 I 153 4930 0 0.01 5 2 2.95 I 154 4961 0 0.02 7 2 2.95 r 155 4992 0 0.02 6 1 2.95 156 5024 0 0.02 8 1 2.94 is 156.1 5055 0 0.04 15 4 2.72 Pup Shallow Line of Pits.Deposits. lim 156.2 5065 0 0 0 0 2.90 GLM 4(LATCH @ 7:00) 156.3 5075 0 0.05 21 2 2.91 Pup Isolated Pitting Lt.Deposits. till 157 5085 0 0.02 9 1 2.93 158 5116 0 0.02 6 1 2.94 159 5148 0 0.02 6 2 2.95 • 160 5179 0 0.02 6 1 2.95 • 161 5211 0 0.02 7 3 2.95 1 162 5242 0 0.02 9 2 2.92 Lt.Deposits. 163 5274 0 0.02 6 2 2.94 i 164 5305 0 0.02 6 1 2.95 a 165 5337 0 0.02 6 2 2.95 • 166 5368 0 0.02 9 1 2.95 • 167 5400 0 0.03 12 1 2.95 168 5431 0 0.02 7 2 2.95 • 169 5461 0 0.02 8 2 2.95 • 170 5493 0 0.02 8 2 2.95 • 171 5524 0 0.02 9 1 2.95 • 172 5555 0 0.02 9 2 2.94 ;I 172.1 5587 0 0.04 14 2 2.89 Pup Lt. Deposits. 172.2 5597 0 0 0 0 2.89 GLM 5(LATCH @ 1:00) 172.3 5606 0 0.04 15 2 2.90 Pup Shallow Line of Pits.Lt. Deposits. C 173 5616 0 0.02 7 2 2.95 174 5648 0 0.03 11 2 2.95 • 175 5679 0 0.02 9 2 2.93 Lt.Deposits. • 176 5711 0 0.02 9 2 2.94 • 177 5742 0 0.02 9 2 2.95 a 178 5774 0 0.02 9 2 2.95 • 179 5805 0 0.02 9 2 2.95 • 180 5837 0 0.02 9 2 2.95 • 181 5868 0 0.02 7 1 2.95 U IPenetration Body Metal Loss Body Page 4 • • git PDS Report joint Tabulation Sheet Well: 1L-15 Survey Date: May 10, 2017 Field: Kuparuk Analyst: C.Waldrop Company: ConocoPhillips Alaska,Inc. Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 3.5 in. 9.3 ppf L-80 EUE 8RD MOD Tubing 2.992 in. 0.254 in. 38 ft. 6,325 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) (in.) (in.) % (in.) 0 50 100 182 5899 0 0.03 10 2 2.94 Vit 183 5931 0 0.02 9 3 2.95 183.1 5962 0 0.03 13 1 2.87 Pup Lt. Deposits. 183.2 5972 0 0 0 0 2.89 GLM 6(LATCH @ 1:00) 183.3 5981 0 0.04 14 2 2.92 Pup Lt. Deposits. 184 5991 0 0.02 8 2 2.95 184.1 6023 0 0.03 11 2 2.93 Pup Lt. Deposits. 184.2 6029 0 0 0 0 2.97 BAKER 80-40 SEAL ASSEMBLY 184.3 6051 0 0 0 0 3.39 BAKER 80-40 PBR 184.4 6059 0 0 0 0 2.87 BAKER PACKER 184.5 6066 0 0.03 12 4 2.92 Pup Lt. Deposits. 184.6 6070 0 0.02 9 1 2.94 Pup 184.7 . 6081 0 0 0 0 2.80 3.5" HES X NIPPLE 184.8 6082 0 0.03 11 2 2.94 Pup 185 6092 0 0.02 8 2 2.95 185.1 6124 0 0.03 13 2 2.92 Pup Lt. Deposits. 185.2 6134 0 0 0 0 2.90 GLM 7(LATCH (4 3:00) 185.3 6143 0 0.04 15 2 2.92 Pup Shallow Line of Pits.Lt. Deposits. IN 186 6153 0 0.02 7 2 2.95 186.1 6184 0 0.04 17 4 2.92 Pup Shallow Pitting. Lt.Deposits. 186.2 6195 0 0 0 0 2.89 GLM 8(LATCH @ 10:00) 186.3 6203 0 0.03 11 2 2.92 Pup Lt. Deposits. 187 6214 0 0.03 10 2 2.96 Blast loint 188 6245 0 0.02 9 2 2.94 Blast Joint • 188.1 6276 0 0.02 9 2 2.94 Pup • 188.2 6281 0 0 0 0 2.95 BAKER LOCATOR SUB 188.3 6284 0 0 0 0 2.96 BAKER 80-40 SEAL ASSEMBLY 188.4 6297 0 0 0 0 2.92 BAKER SBE 188.5 6298 0 0.03 13 2 2.95 Pup 188.6 6303 0 0 0 0 2.88 DEPLOYMENT SLEEVE UPPER WEDGE ASSEMB 188.7 6319 0 0.02 8 0 2.96 Pup • 188.8 6322 0 0 0 0 2.79 3.5" HES GX NIPPLE 188.9 6323 0 0.01 4 0 2.96 Pup IPenetration Body Metal Loss Body Page 5 • • PDS Report Cross Sections Well: 1 L-15 Survey Date: May 10,2017 Field: Kuparuk Tool Type: UW MFC 24 No.211387 Company: ConocoPhillips Alaska, Inc. Tool Size: 1.69 Country: USA No. of Fingers: 24 Tubing: 3.5 in. 9.3 ppf L-80 EUE 8RD MOD Analyst: C.Waldrop Cross Section for Joint 1 .1 at depth 80.210 ft. Tool speed=51 Nominal ID=2.992 Nominal OD=3.5 Remaining wall area=97% Tool deviation= 1° -040 Finger= 1 Penetration=0.054 in. Line of Pits 0.05 in.=21%Wall Penetration HIGH SIDE=UP • • PDS Report Cross Sections tit NIL__. Well: 1 L-15 Survey Date: May 10,2017 Field: Kuparuk Tool Type: UW MFC 24 No.211387 Company: ConocoPhillips Alaska,Inc. Tool Size: 1.69 Country: USA No. of Fingers: 24 Tubing: 3.5 in. 9.3 ppf L-80 EUE 8RD MOD Analyst: C.Waldrop Cross Section for Joint 108.3 at depth 3,513.070 ft. Tool speed=50 Nominal ID=2.992 Nominal OD=3.5 Remaining wall area=97% Tool deviation=3° ,41 1 Finger=9 Penetration=0.053 in. Corrosion 0.05 in.=21%Wall Penetration HIGH SIDE= UP • • PDS Report Cross Sections Well: 1 L-15 Survey Date: May 10,2017 Field: Kuparuk Tool Type: UW MFC 24 No.211387 Company: ConocoPhillips Alaska,Inc. Tool Size: 1.69 Country: USA No. of Fingers: 24 Tubing: 3.5 in. 9.3 ppf L-80 EUE 8RD MOD Analyst: C.Waldrop Cross Section for Joint 156.1 at depth 5,063.720 ft. Tool speed=49 Nominal ID=2.992 Nominal OD=3.5 Remaining wall area=98% Tool deviation=30° / Minimum I.D.=2.717 in. Deposits Minimum I.D.=2.72 in. HIGH SIDE=UP KUP PROD • 1L-15 ConocoPhillips i.. ' Well Attributes Max Angle&MD TD Alaska,Inc. Wellbore APII NNI Field Name Wellbore Status ncl rt MD(ftKB) Act Btm(ftKB) ,- ,„,,,,a,, 500292120400 KUPARUK RIVER UNIT PROD 46.58 6,700.00 6,705.0 ••• Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date IL-15,4/6/201710:06:21 AM SSSV:NONE 50 12/21/2015 Last WO: 10/15/2016 34.80 10/24/1984 • Vertical schematic(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date -- - .,-.- .Last Tag:SLM 6,451.0 9/17/2016 Rev Reason:GLV C/O,FISH IN HOLE see pproven 4/6/2017 NOTES Hanger,276 r; lr Casing Strings ItCasing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)... Wt/Len 1...Grade Top Thread CONDUCTOR 16 15.060 35.0 102.0 102.0 62.50 H-40 WELDED .,,.,���.,,,,�.���,..,.,,,�,�,,,..,wuwuw Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)... WI/Len II...Grade Top Thread ry {1� SURFACE 9 5/8 8.921 34.3 3,475.0 3,474.7 36.00 J-55 BTC .. 3' Casing Description 'OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... WILen(I...Grade Top Thread PRODUCTION 7 6.276 34.3 6,704.0 6,265.1 26.00 J-55 Tubing Strings M7CONDUCTOR;35.0-102.0°' .r-_Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(TVD)(...Wt(lb/ft) Grade Top Connection • TUBING Upper 3 1/2 2.992 0.0 6,285.3 5,962.4 9.30 L-80 EUE 8rd Mod Completion Gas Lift;2.4245 ' l Completion Details Nominal ID Top(ftKB) Top(ND)(ftKB) Top Incl(°) Item Des _ Com (in) SURFACE;34.3-3.4750-& 27.6 27.6 0.00 Hanger Tubing Hanger,FMC TC-1A-EN,7-1/16"x 3-1/2"EUE 8rd - 2.950 Box x Box 6,027.5 5,755.8 35.60 Locator Locator Sub,Baker,GBH-22 3.000 • 6,028.5 5,756.6 35.56 Seal Assy Seal Assembly,Baker,60-40(Seal Assy 21.54'Total 3.000 Gas Un;3,494.0 - Length) 6,035.3 5,762.2 35.26 PBR PBR,Baker,80-40(shear release pinned at 401) 4.000 III • a 6,079.6 5,798.4 35.44 Nipple •X Nipple,HES,2.813" 2.813 Gas Lift,4,373& 6,213.3 5,906.0 37.51 Carbide Blast Blast Joint.9.39 L-80 31/2 EUEM box x 3%HYD 511 pin, 2.992 M • Rings Top Blast Rings 6,226'MD 6,245.0 5,931.0 38.30 Carbide Blast Blast joint 3%9.3#L-80 HYD 511 box x pin,Top Blast 2.992 • Rings Rings 6,272'MD Gas Lift;5,062.9 6,283.8 5,961.3 39.27 Locator Locator Sub,Baker,GBH-22 3.000 6,284.3 5,961.6 39.28 Seal Assy Seal Assembly,Baker,80-40(seal assembly 11.77') 3.000 a (SHEARED) 1111 Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(ND)(...Wt(1b/ft) Grade Top Connection Gas Lift,5,5946 TUBING Lower 5.96 2.992 6,285.3 6,345.4 6,008.4 8rd EUE Completion Completion Details Nominal ID Top(ftKB) Top(ND)(ftKB) Top Incl(1 Item Des Com (in) Gas Lift',5,970.7 ' +. 6,285.3 5,962.4 39.30 Packer Baker"F"Production Packer 4.000 • 6,288.6 5,965.0 39.39 SBE Baker 80-40 12.26'SBE 4.000 • 6,298.0 5,972.2 39.62XO Reducing XO 2.920 Locator;60275 6,307.8 5,979.7 39.86•Deployment Upper Wedge Assembly#2 2.992 ' Sleeve Seal Assy,6,028.5 _ 6,321.8 5,990.4 40.21 Nipple GX Nipple,HES,2.813",SN:7256 2.813 PBR',60353 Packer(Tubing):60577 "-" 6,327.5 5,994.8 40.35 Deployment Lower Wedge Assembly#1 2.992 „ Sleeve 411- 6,341.5 6,005.4 40.69 Nipple GX Nipple,HES,2.813" 2.813 11 6,344.9 6,008.0 40,77-Mule Shoe VVLEG 4.57"OD x 3"ID.Drifted 2.91". 2.992 III Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) Gas Lift,6,122.9 - Top(ND) Top Incl Top(Mee) (ftKB) (') Des Com Run Date ID(in) a 6,330.0 5,996.7 40.41 INNER INNER WEDGE.OAL=40,OAL=380 LBS,MAX 10/26/2016 WEDGE TOOL OD=2.70" Gas Lift,6,194.2 6,341.0 6,005.1 40.68 GUAGES 2.81"X-LOCK w/FLOW THRU SUB(NO PKG/ 10/22/2016 a 29.5"OAL) -. 6,480.0 6,108.0 43.44 Fish Packer&tubing tail from 6313'milled and chased 10/11/2016 Carbide Blast Rings;6,213.3 down to 6480'.Prior to Setting Tandem Wedge&F (PERF,6,235.0-6,248.0-'. - Perm Packer i (PERF;6.2480-6.268.0, _4 6,520.0 6,136.9 44.24'FISH JK Running Tool 4.5"x 1.2"OD,lost 8/24/2004 8/24/2004 Carbide Blast Rings;6,2450 6,526.0 6,141.2 44.38 FISH Parts of 2 Broken GL In Rathole;Also Trash around 2/14/1990 Mandrels Locator',6.283.8isi' Perforations&Slots Seal Assy;6,284.3 Shot Dens Packer 3_ 6,285. Top(ND) Btm(ND) (shots/f SBE;6,288.6 ,.3 Top(ftKB) Btm(ftKB) (ftKB) (ftKB) Zone Date t) Type Com 6,235.0 6,248.0 5,923.1 5,933.4 C-4,1L-15 3/7/1985 12,0 IPERF 5"Scalloped Guns,120 s deg.phasing Depbyment Sleeve;6,307.8 6,248.0 6,268.0 5,933.4 5,949.0 C-4,1L-15 3/7/1985 12.0 IPERF 5"Scalloped Guns,120 t• deg.phasing 1. Nipple',63215 6,393.0 6,416.0 6,044.1 6,061.2 Al-S,iL-15 3/7!1985 4.0 IPERF 4"JJ 11,120 deg. phasing Mandrel Inserts Deployment Sleeve;6,3275- St INNER WEDGE;6,330.00 ati on Top(ND) Valve Latch Port Size TRO Run N lop(ftKB) (ftKB) Make Model OD(inSam Type Type (in) (pail Run Date Coin GUAGES',63410 j` 2,424.5 2,424.3 Camco MMG 11/2 GAS LIFT LGLV RK 0.188 1,29001...000 Nipple',63415 2 3,494.0 3,493.7 Camco MMG 11/2 GAS LIFT OV RK 0.250 12!221201612!2212016 Male Shoe',634a0 3 4,373.6 4,337.8 Camco MMG 11/2 GAS LIFT DMY RK 0.000 12/22/2016 IPERF;6,393.0-6416.0 [ 4 5,062.9 4,944.3 Camco MMG 11/2 GAS LIFT DMY RK 0.000 0.0 12/22/2016 5 5,594.6 5,400.6 Camco MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 12/22/2016 Fish',6,480.0 6 5,970.7 5,709.3 Camco MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 12/22/2016 FISH',6,520.0 ! 7 6,122.9 5,833.6 Camco MMG 11/2 GAS LIFT CV OPEN 0.000 0.0 12/23/2016 FISH',6,5260 I 8 6,1942 5,890.8 Camco MMG 11/2 GAS LIFT HFCV RKP 3/24/2017 PRODUCTION;34.3-6,704.0 • KUP PROD • 1L-15 ConocoPhillips i}l Alaska,Inc. mw,r4hlups 1L-15,4/6/2017 10 06.22 AM Vertical schematic(actual) Hanger;27.6 ,:; 11 Notes:General&Safety End Date Annotation 10/1/2003 NOTE WAIVERED WELL IA x OA ANNULAR COMMUNICATION i L 5'. 10/1/2010 NOTE:View Schematic w/Alaska Schematic9.0 10/15/2016 NOTE:WO In 3/24/2017 NOTE:BTM HALF OD 1.5"X 7"LONG CV BODY UNACCOUNTED FOR-LOCATION OF FISH UNKNOWN LA-A./CONDUCTOR;35.0-102.0• 3/24/2017 NOTE:STA 7 @6,122'RKB HAS LATCH FLOWCUT OFF- Gas Lift;2,424.5 ir al SURFACE;34.3-3,475.0-• • Gas LW;3,494 0 Gas Lift;4.373 6 Gas Lift;5,062 8 �.; Gas Lift;5,594.6 � c� Gas Lift;5,970.7 Locator;6.027,5 Seal Aesy;6,028.5 PBR;6,035.3 Packer(Tubing);6,057.7 Gas Lift;6,122.9 II Gas Lift;6,194.2 Carbide Blast Rings;6,2133 (PERF;6.2350-6,248.0- 's IPERF;6,248.0-6,268.0, I. Carbide Blast Rings;6,245.0 1 [ a Locator,6,283.8 Seal Assy;6,284.3 Packer;6,285 3 SBE;6,288.8 Deployment Sleeve,6,307.8 Nipple;6,321.8 I Depbyment Sleeve;6,327.5 INNER WEDGE;6,330.0 I GUAGES;6,341.0, Nipple;6,341.5 Mule Shoe;6,344.9 IPERF;6,393.0-6,416.0 I Fish;6.480,0 FISH,6,520.0 FISH,6,526.0 PRODUCTION;34.3-6,704.0 STATE OF ALASKA AlkA OIL AND GAS CONSERVATION COMAION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon E Plug Perforations E Fracture Stimulate r Pull Tubing F Operations Shutdown Performed: Suspend Perforate r Other Stimulate I- Alter Casing E Change Approved Program E Plug for Redrill Perforate New Pool fl Repair Well P" Re-enter Susp Well EE 2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number: ConocoPhillips Alaska, Inc. Development F Exploratory E184-183 3.Address: 6.API Number: P. O. Box 100360,Anchorage,Alaska 99510 Stratigraphic Service 50-029-21204-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL 25659 KRU 1L-15 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): NONE Kuparuk River Field/Kuparuk River Oil Pool 11.Present Well Condition Summary: Total Depth measured 6705 feet Plugs(measured) None true vertical 6266 feet Junk(measured) 6480, 6520, 6526 Effective Depth measured 6621 feet Packer(measured) 6058, 6285 true vertical 6210 feet (true vertical) 5781, 5962 Casing Length Size MD TVD Burst Collapse CONDUCTOR 67 16 102 102 SURFACE 3441 9 5/8 3475 3475 PRODUCTION 6670 7 6704 6704 _RECEIVED Perforation depth: Measured depth: 6235-6248,6248-6268,6393-6416 NOV 15 2016 True Vertical Depth: 5923-5933, 5933-5949,6044-6061 : C Tubing(size,grade,MD,and TVD) 3.5, L-80, 6345 MD,6008 ND Packers&SSSV(type,MD,and ND) PACKER(TUBING)-PACKER,BAKER,4762 FHL(SHEAR RELEASE PINNED AT 60K)@ 6058 MD and 5781 ND SSSV:NONE 12.Stimulation or cement squeeze summary: Intervals treated(measured): none SCANNED APP �`( Treatment descriptions including volumes used and final pressure: SCANS 6► 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 185 915 2550 1140 240 Subsequent to operation S/I S/I S/I S/I S/I 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations F Exploratory E Development F Service r Stratigraphic Copies of Logs and Surveys Run r 16.Well Status after work: Oil F Gas E WDSPL E Printed and Electronic Fracture Stimulation Data IT GSTOR IT WINJ r WAG GINJ n SUSP IT SPLUG I- 17. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Danny Kane @ 265-6048 Email Danny.Kane@conocophillips.com Printed Name Danny Kane Title Sr. Wells Engineer Signature ...— Phone:265-6048 Date ....L..._-erc'C-1 --- V rt. 3/2 g/l l- Form 10-404 Revised 5/2015I , �, ,[u`,,Submit Original Only ,4 17yr*'�7 RBDMS v NOV 1 o u 4iir • `" Operations Summary (with Timelog Depths) a IL-15 W C€nioa:O 1 it lips Rig: DOYON 141 Job: RECOMPLETION Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code:. Time P-T-X Operation (EKE) End Depth(ftKB) 10/5/2016 10/5/2016 1.00 MIRU MOVE RURD P Swap power from high line to rig gens. 0.0 0.0 07:00 08:00 Prep rig floor for move.Remove and secure pipe skate rail,secure iron roughneck.Remove 3 1/2"tubing from pipe shed.Prep cellar for move. 10/5/2016 10/5/2016 1.25 MIRU MOVE RURD P Blow down steam and water lines. 0.0 0.0 08:00 09:15 Disconnect interconnect lines.Swap power over to cold start gens. Lift and secure stairs. 10/5/2016 10/5/2016 2.00 MIRU MOVE MOB P PJSM-Load and stage on pad,pipe 0.0 0.0 09:15 11:15 sheds,rock washer and service complexes. 10/5/2016 10/5/2016 2.75'MIRU MOVE MOB P Move rock washer,boiler,motor 0.0 0.0 11:15 14:00 modules and one pipe shed to 1L pad. Stage on 1L pad and return to 3C pad.Sim-ops/Change well row side inner tires on pits module. Install steering arm on substructure. 10/5/2016 10/5/2016 2.00 MIRU MOVE MOB P Load ROC,shop,pipeshed and pit 0.0 0.0 14:00 16:00 modules.Pull sub off of 3C-15. 10/5/2016 10/5/2016 1.50 MIRU MOVE MOB P Move sub,shop,ROC,pit module and 0.0 0.0 16:00 17:30 pipe shed from 3C pad to CPF 3. 10/5/2016 10/5/2016 1.50 MIRU MOVE WAIT P Stop at CPF 3 for field change out. 0.0 0.0 17:30 19:00 10/5/2016 10/5/2016 2.00 MIRU MOVE MOB P Move sub,shop,ROC,pit module and 0.0 0.0 19:00 21:00 pipe shed from CPF 3 to 1L pad. 10/5/2016 10/5/2016 0.50 MIRU MOVE MOB P Stage modules on 1L pad. 0.0 0.0 21:00 21:30 10/5/2016 10/6/2016 2.50 MIRU MOVE MOB P Spot sub over well 1L-15. 0.0 0.0 21:30 00:00 10/6/2016 10/6/2016 3.00 MIRU MOVE MOB P Con't to spot sub on 1 L-15.Level and 0.0 0.0 00:00 03:00 shim sub. 10/6/2016 10/6/2016 1.00 MIRU MOVE MOB P Prep pad and lay mats for support 0.0 0.0 03:00 04:00 modules. 10/6/2016 10/6/2016 1.00 MIRU MOVE MOB P Spot pit and pump modules. 0.0 0.0 04:00 05:00 10/6/2016 10/6/2016 1.25 MIRU MOVE MOB P Spot motor module. 0.0 0.0 05:00 06:15 10/6/2016 10/6/2016 0.75 MIRU MOVE MOB P Lay herculite and set boiler module. 0.0 0.0 06:15 07:00 Sim-ops/Hook up high pressure mud lines,interconnects and electrical connections. 10/6/2016 10/6/2016 0.50 MIRU MOVE MOB P Lay herculite and spot rock washer 0.0 0.0 07:00 07:30 and envirovac.Sim-ops/Hook up interconnects and electrical connections. 10/6/2016 10/6/2016 0.50 MIRU MOVE MOB P Spot pipe sheds.Sim-ops/Hook up 0.0 0.0 07:30 08:00 high pressure mud lines,interconnects and electrical connections. 10/6/2016 10/6/2016 0.50 MIRU MOVE MOB P Spot ROC.Sim-ops/Hook up high 0.0 0.0 08:00 08:30 pressure mud lines,interconnects and electrical connections. 10/6/2016 10/6/2016 1.00 MIRU MOVE RURD P Swap power from cold starts to rig 0.0 0.0 08:30 09:30 gens.Turn on water,steam and air systems throughout rig. Page 1/10 Report Printed: 10/20/2016 • rf k°sOperations Summary (with Timelog Depths) 1L-15 ConocoPhillips kik sks Rig: DOYON 141 Job: RECOMPLETION Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 10/6/2016 10/6/2016 0.50 MIRU MOVE RURD P Spot shop.Handy berm envirovac and 0.0 0.0 09:30 10:00 rock washer. Update well signage. Test gas alarms. Install skate rail. 10/6/2016 10/6/2016 2.00 MIRU WELCTL RURD P Bring into pits 9.8 ppg NaCI brine. 0.0 0.0 10:00 12:00 Prime both mud pumps.Install plugs in centrifugal pumps. Rig accepted at 10:00 hrs on 10/6/16 10/6/2016 10/6/2016 1.50 MIRU WELCTL RURD P PJSM-Con't to bring on brine.Load 0.0 0.0 12:00 13:30 621 bbls total.Sim-ops/Berm envirovac,test mud pumps and lines to 3500 psi. 10/6/2016 10/6/2016 4.25 MIRU WELCTL MPSP P Rig up lubricator and test to 1000 psi. 0.0 0.0 13:30 17:45 Attempt to pull BPV.On first attempt did not have long enough rod.Add extension and attempt again.Sheared off running tool. Redress running tool and pull BPV.Rig down lubricator. 10/6/2016 10/6/2016 0.75 MIRU WELCTL SEQP P PJSM-Rig up and test line to kill tank 0.0 0.0 17:45 18:30 to 2000 psi. 10/6/2016 10/6/2016 2.00 MIRU WELCTL KLWL P PJSM-SITP=150 psi SICP=0 psi. 0.0 0.0 18:30 20:30 Bleed off gas cap. Reverse circ diesel cap out of tubing.Pump 45 bbls 9.8 ppg brine down IA taking returns from tubing to kill tank at 2 bpm,400 psi. Line up and pump 280 bbls 9.8 ppg brine down tubing taking returns from IA to kill tank at 4 bpm. ICP=590 psi FCP=980 psi 10/6/2016 10/6/2016 1.00 MIRU WELCTL OWFF P Blow down line to kill tank.Monitor 0.0 0.0 20:30 21:30 well.Slight flow from IA. 10/6/2016 10/6/2016 1.50 MIRU WELCTL CIRC P Rig up and circ surface to surface 9.8 0.0 0.0 21:30 23:00 ppg brine at 5 bpm, 1325 psi. 10/6/2016 10/6/2016 0.25 MIRU WELCTL OWFF P Monitor well.Static. 0.0 0.0 23:00 23:15 10/6/2016 10/6/2016 0.50 MIRU WHDBOP MPSP P Set BPV.Test in direction of flow to 0.0 0.0 23:15 23:45 1000 psi/10 min.Rig down test lines. 10/6/2016 10/7/2016 0.25 MIRU WHDBOP NUND P Prep tree for removal. 0.0 0.0 23:45 00:00 10/7/2016 10/7/2016 3.00 MIRU WHDBOP NUND P ND tree and remove from cellar. 0.0 0.0 00:00 03:00 Mobilize new tree into cellar and secure.Mobilize spacer spool into cellar. 10/7/2016 10/7/2016 5.00 MIRU WHDBOP NUND P NU 7 1/16"x 13 5/8"DSA and spacer 0.0 0.0 03:00 08:00 spool.MU 2 7/8"test joint and RIH to hanger.Measure space out with x-o's and blanking plug.NU BOPE.Install IA flange.Open upper ram doors and inspect rams. 10/7/2016 10/7/2016 1.75 MIRU WHDBOP RURD P Rig up to test BOPE. Fill stack with 0.0 0.0 08:00 09:45 water,flood poor boy degasser and choke.Bleed air from choke and shell test BOPE. Page 2/10 Report Printed: 10/20/2016 • • Operations Summary (with Timelog Depths) K ,mac 1 L-15 ConocoPhillips Rig: DOYON 141 Job: RECOMPLETION Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB): End Depth(ftKB), 10/7/2016 10/7/2016 7.00 MIRU WHDBOP BOPE P PJSM-Test BOPE w/2 7/8"test joint 0.0 0.0 09:45 16:45 250/3000 psi-5 min ea.#1-Upper VBR's,CV 1,12,13,14 and manual kill. #2-Upper IBOP,HCR kill,CV 9,11.#3 -Lower IBOP,CV 5,8,10.#4-Dart valve,CV#4,6,7.#5-Floor valve,CV #2.#6-HCR choke,kill line 4"Demco. #7-Manual choke valve, HCR kill.#8- Annular preventer to 250/2500 psi.#9- Lower VBR's.#10-Blind rams,CV3. #11-Annular w/4"test joint to 250/2500 psi 5 min ea.#12-Upper VBR's w/4"test joint to 250/3000 psi 5 min ea.#13-Lower VBR's w/4"test joint to 250/3000 psi 5 min ea. Perform drawdown test on manual and hydraulic chokes. Conduct Koomey Draw Down Test: Starting Accumulator Pressure=3000 psi Accumulator Pressure After Closer= 1800 psi Pressure Gain of 200 psi=45 seconds Full System=191 Seconds Average N2(5 Bottles)=2025 psi Test witnessed by AOGCC Rep Matt Herrara 10/7/2016 10/7/2016 0.75 MIRU WHDBOP RURD P Blow down and rig down BOPE test 0.0 0.0 16:45 17:30 equipment. 10/7/2016 10/7/2016 0.50 COMPZN RPCOMP RURD P Mobilize 3 1/2"tubing equipment to rig 0.0 0.0 17:30 18:00 floor.Change out elevators. 10/7/2016 10/7/2016 0.50 COMPZN RPCOMP MPSP P Rig up and pull BPV. 0.0 0.0 18:00 18:30 10/7/2016 10/7/2016 0.50 COMPZN RPCOMP RURD P Pick up tubing tongs,control line 0.0 0.0 18:30 19:00 spooler,2 7/8"handling equip. 10/7/2016 10/7/2016 1.25 COMPZN RPCOMP MPSP T Set BPV and test from below to 1000 0.0 0.0 19:00 20:15 psi in order to remove plug valve from spacer spool and install blind flange. Screw landing joint into hanger. 10/7/2016 10/7/2016 1.00 COMPZN RPCOMP SEQP T Test blind flange on spacer spool to 0.0 0.0 20:15 21:15 3000 psi/5 min.Lay down landing joint. 10/7/2016 10/7/2016 0.50 COMPZN RPCOMP MPSP T Rig up and pull BPV. 0.0 0.0 21:15 21:45 10/7/2016 10/7/2016 1.00 COMPZN RPCOMP RURD P Make up landing joint to hanger and 0.0 0.0 21:45 22:45 top drive.BOLDS. 10/7/2016 10/7/2016 0.25 COMPZN RPCOMP PULL P Unseat tubing hanger at 70K.Pull to 6,054.0 6,026.0 22:45 23:00 rig floor. PU=63K.Distance to hanger=24.31'. 10/7/2016 10/7/2016 0.75 COMPZN RPCOMP CIRC P CBU.7 bpm,2100 psi.Max gas on 6,026.0 6,026.0 23:00 23:45 bottoms up=49 units on Totco GW. 10/7/2016 10/8/2016 0.25 COMPZN RPCOMP OWFF P Monitor well.Static. 6,026.0 6,026.0 23:45 00:00 10/8/2016 10/8/2016 1.00 COMPZN RPCOMP RURD P R/U control line to spooler,LD hanger 6,026.0 6,026.0 00:00 01:00 and landing joint. 10/8/2016 10/8/2016 2.50 COMPZN RPCOMP PULL P Pull 2.875"tubing 6,026.0 5,171.0 01:00 03:30 10/8/2016 10/8/2016 0.50 COMPZN RPCOMP RURD P RD control line and Camco spooler. 5,171.0 5,171.0 03:30 04:00 Page 3/10 Report Printed: 10/20/2016 0,:., • • 5j�1 r Operations Summary (with Timelog Depths) 1 L-15 conocoPtaitlips x;, Rig: DOYON 141 Job: RECOMPLETION Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 10/8/2016 10/8/2016 3.50 COMPZN RPCOMP PULL P Continue pulling&strapping 5,171.0 0.0 04:00 07:30 decompletion. Total full joints recovered=193 Cut joint on 194(14.03')out of hole, total length of fish 6026'-RKB 6053'. Recover total of 34 SS control line bands. 10/8/2016 10/8/2016 1.00 COMPZN RPCOMP RURD P RD casing equipment 0.0 0.0 07:30 08:30 10/8/2016 10/8/2016 3.00 COMPZN WELLPR BHAH P PJSM-prep rig floor and P/U Fishing 0.0 317.0 08:30 11:30 BHA#1. 10/8/2016 10/8/2016 3.00 COMPZN WELLPR PULD P PJSM-PU 4"XT39 drillpipe from pipe 317.0 1,545.0 11:30 14:30 shed f/317'MD t/1450'MD.Make up storm packer and RIH t/1545'MD.Set storm packer COE at 111.06.Stand back one stand of DP and lay down running tool.Sim-ops/Mobilize tubing spool to cellar. 10/8/2016 10/8/2016 0.75 COMPZN WELLPR MPSP P RU and test storm packer to 1000 1,545.0 0.0 14:30 15:15 psi/10 min.Charted. 10/8/2016 10/8/2016 0.75 COMPZN WELLPR NUND P PJSM-ND BOPE. 0.0 0.0 15:15 16:00 10/8/2016 10/8/2016 0.50 COMPZN WELLPR RURD P PJSM-ND annulus valve and IA flange 0.0 0.0 16:00 16:30 from tubing spool.Remove every other bolt from the tubing spool lower flange. 10/8/2016 10/8/2016 2.00 COMPZN WELLPR NUND P PJSM-RU Hydratight and ND the 0.0 0.0 16:30 18:30 tubing spool using Hydratight to control the casing growth.Initial Hydratight pressure=15,000 psi. Final Hydratight pressure=1200 psi. Final casing growth=20.25".RD Hydratight. 10/8/2016 10/8/2016 0.50 COMPZN WELLPR NUND P Remove remaing bolts from casing 0.0 0.0 18:30 19:00 head flange and remove tubing spool from 7"casing.Rig up to pull casing slips. 10/8/2016 10/8/2016 1.00 COMPZN WELLPR CUTP P PJSM-Spear 7"casing.PU to 50K 0.0 0.0 19:00 20:00 over neutral weight to 130K.Stretch casing 6.25".Unable to pull slips.Set existing 7"emergency slips. 10/8/2016 10/8/2016 1.75 COMPZN WELLPR CUTP P PJSM-Rig up Wachs cutter.Cut 2.65' 0.0 0.0 20:00 21:45 off 7"casing.Rig down Wachs cutter. 10/8/2016 10/8/2016 0.50 COMPZN WELLPR WWSP P Prep 7"casing stub and install packoff 0.0 0.0 21:45 22:15 10/8/2016 10/8/2016 1.25 COMPZN WELLPR NUND P Install FMC Gen IV 11"3K x 7 1/6"5K 0.0 0.0 22:15 23:30 tubing spool. 10/8/2016 10/9/2016 0.50 COMPZN WELLPR WWSP P PT packoff to 250/3000 psi for 10 min 0.0 0.0 23:30 00:00 each.Witnessed by company rep. 10/9/2016 10/9/2016 2.50 COMPZN WELLPR NUND P N/U BOPE&prep to pressure test 0.0 0.0 00:00 02:30 10/9/2016 10/9/2016 0.50 COMPZN WELLPR BOPE P Test Bottom BOP flange 250/3000 psi. 0.0 0.0 02:30 03:00 5 mins Chart. RD test equipment&install 6 7/16"ID wear ring 10/9/2016 10/9/2016 1.50 COMPZN WELLPR MPSP P Engage Storm packer,release break 1,545.0 1,450.0 03:00 04:30 circulation @ 3 bpm 130 psi.shut down pumps,Pull storm packer to rig floor&lay down. Page 4/10 Report Printed: 10/20/2016 • 0 Operations Summary (with Timelog Depths) 0 1L-15 ..��Hip Rig: DOYON 141 Job: RECOMPLETION Time Log Start Depth Start Time End Time. Dur(hr) Phase Op Code Activity Code Time P-T x Operation (EKE) End Depth(EKE) 10/9/2016 10/9/2016 3.50 COMPZN RPCOMP PULD P P/U and single in 4"DP from 1450 ft to 1,450.0 6,047.0 04:30 08:00 top of fish @ 6047'MD P/U weight 120K DN weight 112K 10/9/2016 10/9/2016 1.50 COMPZN RPCOMP FISH P Tag top of fish 16ft in on joint 182- 6,047.0 6,025.0 08:00 09:30 6040'RKB.P/U and pump 3 bpm @ 210 psi,wash down over fish and seen pressure increase©6047.Shut down pumps.Set down 10K,P/U to 140K.Set back down and swallow fish down to 6053'.Grapple engaged. P/U to 155K(35K)over string weight. jars fired-seals came free. P/U 20 ft,circulate and RIH slowly to watch if seals enage-pressured up© 6035'.Bleed off pressure,P/U 3 ft. Circ B/U 5 bpm @ 500 psi. Light crude/gas near B/U-well cleaned up. 1864 stks. 1350 stks B/U. OWFF for 10 mins-good. 10/9/2016 10/9/2016 1.75 COMPZN RPCOMP TRIP P TOOH standing back 4"DP f/6025' 6,025.0 317.0 09:30 11:15 MD t/317'MD. Calc disp=37.25 bbls Act disp=38.93 bbls. 10/9/2016 10/9/2016 2.50 COMPZN RPCOMP BHAH P Lay down accelerator,stand back)3 317.0 0.0 11:15 13:45 std's 4 3/4"DC's.Pull fish to floor and lay down. Recover cut joint=17.84' and seal assy=10.76'.Service break overshot. 10/9/2016 10/9/2016 1.25 COMPZN RPCOMP BHAH P PJSM-Make up Fishing Spear BHA 0.0 314.0 13:45 15:00 #3. 10/9/2016 10/9/2016 2.00 COMPZN RPCOMP TRIP P RIH w/spear BHA to 5199'MD. 314.0 5,199.0 15:00 17:00 PU=120K SO-110K. Calc disp=37.99 bbls Act disp=36.04 bbls 10/9/2016 10/9/2016 0.25 COMPZN RPCOMP FISH P Break circ.Obtain SPR's.PU=120K 5,199.0 6,049.0 17:00 17:15 50=110K.Slack off pumping at 2 bpm,500 psi. Pressure increased 100 psi when entering tubing stub.No-go out at 6059'MD.Set down 5K wt.Pick up and overpull 20K.to verify engagement.. PU to 155K and bleed jar open.PU to 195K and release packer.Pull up to 6049'MD.PU=150K 10/9/2016 10/9/2016 1.50 COMPZN RPCOMP CIRC P CBU 1.5x.Stage pump up to 3 bpm, 6,049.0 6,049.0 17:15 18:45 1200 psi. 15%FO.36 bph loss rate. Max gas=215 units on BU. 10/9/2016 10/9/2016 0.50 COMPZN RPCOMP OWFF P OWFF. 15 bph static loss rate.Blow 6,049.0 6,049.0 18:45 19:15 down TD. 10/9/2016 10/9/2016 1.50 COMPZN RPCOMP TRIP P POOH to 5295'MD slowly.Packer 6,049.0 5,295.0 19:15 20:45 drag and swabbing observed. 10/9/2016 10/9/2016 0.50 COMPZN RPCOMP OWFF P Monitor well.Fluid level dropping in 5,295.0 5,295.0 20:45 21:15 stack. 10/9/2016 10/10/2016 2.75 COMPZN RPCOMP TRIP P Con't POOH slow f/5295'MD t/3721' 5,295.0 3,721.0 21:15 00:00 MD.Observe random 25K overpull. Calc disp=13.5 bbls Act disp=25.68 bbls 10/10/2016 10/10/2016 3.50 COMPZN RPCOMP TRIP P TOOH from 3721'to 314' 3,721.0 314.0 00:00 03:30 Page 5/10 Report Printed: 10/20/2016 • Operations Summary (with Timelog Depths) 1L-15 Conoccftaiiiips �fafikm Rig: DOYON 141 Job: RECOMPLETION Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (fiKB) End Depth(ftKB}'.. 1 0/1 0/201 6 10/10/2016 2.00 COMPZN RPCOMP BHAH P OWFF for 5 mins,stand back 3 DC 314.0, 0.0 03:30 05:30 stands,lay down ACc&Jars. Lay down Fish-packer,2 GLM,3 full jnts, 1 cut joint total fish=137.13' 10/10/2016 10/10/2016 0.50 COMPZN RPCOMP RURD P Clean up rig floor,P/U Baker floor 0.0 0.0 05:30 06:00 equipment. 10/10/2016 10/10/2016 1.50 COMPZN RPCOMP BHAH P PJSM-M/U Baker BHA#4(Rat pak 0.0 325.0 06:00 07:30 &jars)to recover blast ring fish.test Rat pack @ 2bpm/1200 psi.good test. 10/10/2016 10/10/2016 1.50 COMPZN RPCOMP TRIP P TIH to to 6185'Fluid losses 5 bph 325.0 6,197.0 07:30 09:00 static. Test Rattler 1.7 bpm/1200 psi,P/U weight 122K,SO 112K, 10/10/2016 10/10/2016 2.00 COMPZN RPCOMP FISH P Latch over fish @ 6197'MD,continue 6,197.0 6,803.0 09:00 11:00 to slack off to no go @ 6203',Set down 5K.P/U 20K over,slack back off,turn on rattler @ 1.7 bpm, 1200 psi,P/U to a max 150K max.Continue with RATPAC increase to 2.7 bpm/1500 psi.Making slight progress, weight dropping off 1-2 K,keep P/U to 150K.Good rattling action downhole to surface.Fluid losses roughly 40 bph while pumping. 10/10/2016 10/10/2016 0.75 COMPZN RPCOMP JAR P Start to slack off weight and work jars 6,803.0 6,311.0 11:00 11:45 along with RatPac tool,jarring 20K over max pull 150 K,gain 6-8"every jar lick,looks like seal assembly is coming with the blast rings.After jar hit#13 fish came free with 135K. continue pumping and pulling 1 full stand to clear perfs. 10/10/2016 10/10/2016 0.50 COMPZN RPCOMP OWFF P Top up hole and monitor for 30 mins 6,311.0 6,311.0 11:45 12:15 while crew change.Perfrom derrick inspection. 10/10/2016 10/10/2016 0.75 COMPZN RPCOMP SFTY P Perform post jarring derrick inspection. 6,311.0 6,311.0 12:15 13:00 10/10/2016 10/10/2016 3.00 COMPZN RPCOMP TRIP P TOOH with fish,fill the hole every 5 6,311.0 325.0 13:00 16:00 stands. 10/10/2016 10/10/2016 1.00 COMPZN RPCOMP BHAH P Lay down BHA.Stand back 3 stds 325.0 125.0 16:00 17:00 DC's.Lay down pump out sub,jar, bumper sub and rattler. 10/10/2016 10/10/2016 2.50 COMPZN RPCOMP PULL P PJSM-Lay down fish.Recover cut jt, 125.0 0.0 17:00 19:30 2x blast jts,3x pup jts,GLM and seal assy.Remove blast rings as per PESI rep.All blast rings intact. 10/10/2016 10/10/2016 1.00 COMPZN RPCOMP SLPC P Slip and cut 65'drilling line. 0.0 0.0 19:30 20:30 10/10/2016 10/10/2016 0.75 COMPZN RPCOMP PULL P PJSM-Pick up and service break and 0.0 0.0 20:30 21:15 lay down overshot and cut jt.Cut jt. length=15.13'. 10/10/2016 10/10/2016 0.50 COMPZN RPCOMP BHAH P Clear rig floor.Mobilize milling BHA to 0.0 0.0 21:15 21:45 rig floor. 10/10/2016 10/10/2016 1.50 COMPZN RPCOMP BHAH P Make up Mill BHA to 333'MD 0.0 333.0 21:45 23:15 10/10/2016 10/11/2016 0.75 COMPZN RPCOMP TRIP P TIH w/mill BHA to 1562'MD. 333.0 1,562.0 23:15 00:00 Calc disp=11.6 bbls Act disp=33.43 Losses for previous 12 hrs=280 bbls Page 6/10 Report Printed: 10/20/2016 Operations Summary (with Timelog Depths) 00 J 1 L-15 ConocoPhiilips Rig: DOYON 141 Job: RECOMPLETION Time Log Start Depth Start Time'' -. End Time Dur(hr)± Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 10/11/2016 10/11/2016 1.75 COMPZN RPCOMP TRIP 'P RIH f/1562'to 6199' 1,562.0 6,199.0 00:00 01:45 10/11/2016 10/11/2016 0.50 COMPZN RPCOMP SVRG P Service rig,top drive and drawworks 6,199.0 6,199.0 01:45 02:15 10/11/2016 10/11/2016 0.50 COMPZN RPCOMP REAM P Ream down f/6199't/6242'taking 6,199.0 6,242.0 02:15 02:45 weight 5 to 25k slack off unsable to work packer mill through tight spot 10/11/2016 10/11/2016 0.50 COMPZN RPCOMP WAIT X Discuss options with town decide to 6,242.0 6,242.0 02:45 03:15 pull out of the hole 10/11/2016 10/11/2016 0.75 COMPZN RPCOMP 'CIRC X Spot Hi Vis pill on bottom 5 bpm 600 6,242.0 6,199.0 03:15 04:00 psi.L/D 2 Singles t/6199 10/11/2016 10/11/2016 0.25 COMPZN RPCOMP OWFF X Observe well f/flow well static 6,199.0 6,199.0 04:00 04:15 10/11/2016 10/11/2016 1.75 COMPZN RPCOMP TRIP X POOH f/6199't/333' 6,199.0 333.0 04:15 06:00 10/11/2016 10/11/2016 1.50 COMPZN RPCOMP BHAH X Stand Back and L/D BHA clear floor 333.0 0.0 06:00 07:30 10/11/2016 10/11/2016 2.25 COMPZN RPCOMP WAIT X Wait on tools coming from deadhorse, 0.0 0.0 07:30 09:45 monitor weell on trip tank 10-16 bph losses 10/11/2016 10/11/2016 1.25 COMPZN RPCOMP BHAH X M/U BHA#6 as per detail t/335' 0.0 335.0 09:45 11:00 10/11/2016 10/11/2016 2.00 COMPZN RPCOMP TRIP X RIH w/Milling BHA f/335't/6234' 335.0 6,234.0 11:00 13:00 10/11/2016 10/11/2016 2.75 COMPZN RPCOMP MILL X Wash down U 6247'tagging up 5k 6,234.0 6,304.0 13:00 15:45 work mills down t/6277'setting down 10k no rotary,work through,Slide mills down t/top of packer©6304' tag 2 times 10 k slack off no rotation, work mills up through tight spots 2-3k over pull 10/11/2016 10/11/2016 0.75 COMPZN RPCOMP CIRC X Spot hi vis pill on bottom 3 bpm 400 6,304.0 6,304.0 15:45 16:30 psi. 10/11/2016 10/11/2016 0.25 COMPZN RPCOMP OWFF X Observe well for flow well static in 10 6,304.0 6,304.0 16:30 16:45 min. 10/11/2016 10/11/2016 2.50 COMPZN RPCOMP TRIP X POOH w/milling assy.f/6304't/335' 6,304.0 335.0 16:45 19:15 10/11/2016 10/11/2016 0.75 COMPZN RPCOMP BHAH X Stand Back and L/D BHA#6 335.0 0.0 19:15 20:00 10/11/2016 10/11/2016 0.75 COMPZN RPCOMP BHAH X M/U BHA#7 Packer Mill RIH t/333' 0.0 333.0 20:00 20:45 10/11/2016 10/11/2016 1.75 COMPZN RPCOMP TRIP X RIH w/Packer Milling BHA f/333'to 333.0 6,199.0 20:45 22:30 6199' 10/11/2016 10/12/2016 1.50 COMPZN RPCOMP MILL P Wash down f/6199'to 6304'top of 6,199.0 6,304.0 22:30 00:00 packer,slight bobble observed going through tight spots 3k down weight, Set down on packer begin milling packer 7-8k WOB 80 RPM 2 bpm 125 psi 10/12/2016 10/12/2016 1.00 COMPZN RPCOMP MILL P Continue to mill on packer f/6304't/ 6,304.0 6,481.0 00:00 01:00 6307'100 rpm 2 bpm 165 psi Broke free chase packer t/6481'set down 25k 3 times 10/12/2016 10/12/2016 1.00 COMPZN RPCOMP CIRC P Circulate bottoms up 5 bpm 550 psi 6,481.0 6,481.0 01:00 02:00 slight gas observed at bottoms up 10/12/2016 10/12/2016 0.50 COMPZN RPCOMP OWFF P Observe well for flow well static slight 6,481.0 6,481.0 02:00 02:30 drop 10/12/2016 10/12/2016 1.75 COMPZN RPCOMP TRIP P POOH f/6481't/333' 6,481.0 333.0 02:30 04:15 Page 7/10 Report Printed: 10/20/2016 • • `'' Operations Summary (with Timelog Depths) 1L-15 ConocoPhinips Rig: DOYON 141 Job: RECOMPLETION Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (EKE)', End;,Depth(ftKB) 10/12/2016 10/12/2016 1.00 COMPZN RPCOMP BHAH P Stand Back and L/D BHA clear floor 333.0 0.0 04:15 05:15 10/12/2016 10/12/2016 0.75 COMPZN WELLPR BHAH 'P M/U BHA#8 Clean out BHA 0.0 338.0 05:15 06:00 10/12/2016 10/12/2016 2.00 COMPZN WELLPR TRIP P RIH w/Clean Out Assy f/338't/6489' 338.0 6,489.0 06:00 08:00 Set down on top of Packer w/25k 10/12/2016 10/12/2016 1.75 COMPZN WELLPR CIRC P Pump Hi Vis Sweep @ 5 bpm 500 psi 6,489.0 6,489.0 08:00 09:45 10/12/2016 10/12/2016 0.25 COMPZN WELLPR OWFF P Observe well for flow Well static 6,489.0 6,489.0 09:45 10:00 10/12/2016 10/12/2016 1.75 COMPZN WELLPR TRIP P POOH f/6489't/338' 6,489.0 338.0 10:00 11:45 10/12/2016 10/12/2016 1.25 COMPZN WELLPR BHAH P Stand back and L/D BHA. 338.0 0.0 11:45 13:00 Between magnets and junk basket had about 15 lbs of metal filings and part of old packer element. 10/12/2016 10/12/2016 3.00 COMPZN WELLPR WAIT T Wait on Wire line,Simops clean and 0.0 0.0 13:00 16:00 clear floor,Service rig and draworks 10/12/2016 10/12/2016 1.50'COMPZN WELLPR ELNE P Spot eline unit,R/U Eline equipment, 0.0 0.0 16:00 17:30 M/U eline tools. 10/12/2016 10/12/2016 2.75 COMPZN WELLPR ELNE P RIH w/Eline Gauge ring U 6413'WLM 0.0 0.0 17:30 20:15 POOH, L/D Eline tools, 10/12/2016 10/12/2016 1.75 COMPZN WELLPR PUTB P M/U Wedge Assy.w/Packer as per 0.0 0.0 20:15 22:00 detail RIH 10/12/2016 10/12/2016 0.75 COMPZN WELLPR ELNE P M/U Eline Tools t/Wedge Assy. 0.0 0.0 22:00 22:45 10/12/2016 10/13/2016 1.25 COMPZN WELLPR ELNE P RIH w/Tandem Wedge Assy.on Eline 0.0 0.0 22:45 00:00 10/13/2016 10/13/2016 2.00 COMPZN WELLPR ELNE P RIH with Tandem Wedge assembly. 0.0 0.0 00:00 02:00 Could not drift past 6250'WLMD. 10/13/2016 10/13/2016 2.00 COMPZN WELLPR ELNE P Call town, decision made to run on 0.0 0.0 02:00 04:00 DP and log with Eline thru DP.TOOH with E-line&set aside equipment. 10/13/2016 10/13/2016 3.00 COMPZN WELLPR WAIT T Wait on J setting tool to arrive from 0.0 0.0 04:00 07:00 BOT shop 10/13/2016 10/13/2016 1.50 COMPZN WELLPR 'PULD T P/U J setting tool 0.0 0.0 07:00 08:30 10/13/2016 10/13/2016 3.00 COMPZN WELLPR TRIP T TIH with Tandem wedge assembly&J 0.0 6,230.0 08:30 11:30 setting tool. 10/13/2016 10/13/2016 1.00 COMPZN WELLPR TRIP T P/U weight 115K/DN 107K.Single in 6,230.0 6,354.0 11:30 12:30 from 6230'-began seeing tight spot, had 5K set down,worked down encountering 7=8K set down to get thru tight spot @ 6250'.Stop slightly below setting depth RKB pipe depth @ 6354' 10/13/2016 10/13/2016 1.00 COMPZN WELLPR ELNE T PJSM-crew change&R/U Eline 6,354.0 6,354.0 12:30 13:30 Page 8/10 Report Printed: 10/20/2016 • • 0 • Operations Summary (with Timelog Depths) 1 L-15 conocophimps �fxfik.a Rig: DOYON 141 Job: RECOMPLETION Time Log Start Depth Start Time ,, End Time Dur(hr)" Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKS)': 10/13/2016 10/13/2016 1.50 COMPZN WELLPR ELNE T TIH with E-line Tie in correction+2ft 6,354.0 6,345.0 13:30 15:00 for E-line.Tag No-go in J setting tool. Log up hole-determined to P/U pipe 13 ft to packer setting depth of 6285' putting 6310'KOP of upper Wedge& 6330'Lower Wedge/total BHA depth 6345' P/U pipe 14ft-re-log and double check tie in CCL.,good verification pass.Mark pipe as originally planned. 10/13/2016 10/13/2016 1.00 COMPZN WELLPR ELNE P TOOH with E line/Lower pipe to rig 6,345.0 6,345.0 15:00 16:00 floor. R/D E-line 10/13/2016 10/13/2016 0.75 COMPZN WELLPR PACK P P/U to mark on pipe 13ft.drop 1-7/16" 6,345.0 6,345.0 16:00 16:45 ball,Make up TD,Pump Ball to seat 2.5 bpm 100 psi,pressure up t/1500 psi Shear out of packer,top of packer @ 6279.72' 10/13/2016 10/13/2016 0.25 COMPZN WELLPR OWFF P Observe well for flow well static 6,345.0 6,279.0 16:45 17:00 10/13/2016 10/13/2016 1.75 COMPZN WELLPR TRIP T POOH W/Running tool 6,279.0 0.0 17:00 18:45 10/13/2016 10/13/2016 0.75 COMPZN WELLPR BHAH P UD BHA Clear Floor 0.0 0.0 18:45 19:30 10/13/2016 10/13/2016 0.75 COMPZN WELLPR BHAH P M/U BHA Test packer RIH 0.0 0.0 19:30 20:15 10/13/2016 10/13/2016 2.75 COMPZN WELLPR TRIP P RIH w/test packer t/6276' 0.0 6,276.0 20:15 23:00 10/13/2016 10/13/2016 0.50 COMPZN WELLPR PRTS P Test Casing below test packer t/2500 6,276.0 6,276.0 23:00 23:30 psi f/10 min,Unset packer 10/13/2016 10/13/2016 0.25 COMPZN WELLPR TRIP P POOH t/6058' 6,276.0 6,058.0 23:30 23:45 10/13/2016 10/14/2016 0.25 COMPZN WELLPR PRTS P Test casing above packer t/2500 psi f/ 6,058.0 6,058.0 23:45 00:00 10 min 10/14/2016 10/14/2016 0.75 COMPZN WELLPR OWFF P Monitor well for flow well static slight 6,058.0 6,058.0 00:00 00:45 drop,blow down top drive. 10/14/2016 10/14/2016 4.50 COMPZN WELLPR TRIP P POOH w/test packer f/6048'L/D 6,058.0 0.0 00:45 05:15 singles in shed, UD Collars in Derrick and remaining three stands, UD Test Packer 10/14/2016 10/14/2016 0.25 COMPZN WELLPR SEQP P Remove wear ring 0.0 0.0 05:15 05:30 10/14/2016 10/14/2016 2.00 COMPZN WELLPR RURD P R/U t/run 3.5 tubing,R/U tongs, 0.0 0.0 05:30 07:30 elevators and check jewelry. 10/14/2016 10/14/2016 0.50 COMPZN WELLPR SVRG P Service rig and top drive 0.0 0.0 07:30 08:00 10/14/2016 10/14/2016 8.00 COMPZN RPCOMP PUTB P Run upper completion as per detail t/ 0.0 6,271.0 08:00 16:00 6271' 10/14/2016 10/14/2016 1.00 COMPZN RPCOMP HOSO P Space out and NoGo on locator @ 6,271.0 6,285.0 16:00 17:00 6299'w/charge pumps rolling observe 100 psi increase P/U t/6285' 10/14/2016 10/14/2016 ' 1.00 COMPZN RPCOMP CRIH P Spot 30 bbls 9.8 ppg corrosion 6,285.0 6,285.0 17:00 18:00 Inhibited brine followed by 40 bbls 9.8ppg brine 10/14/2016 10/14/2016 1.00 COMPZN RPCOMP PACK P RIH t/6298'Set Packer as per Baker 6,285.0 6,028.0 18:00 19:00 Rep,put 1500 psi on tubing,Test IA t/ 2500 psi f/10 min Bleed off IA,P/U and shear out Packer. Page 9/10 Report Printed: 10/20/2016 • • 0 .'••• :::',r Operations Summary (with Timelog Depths) • ,,r 1 L-15 Conoccehiflips Rig: DOYON 141 Job: RECOMPLETION Time Log Start Depth'... Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-XOperation (EKE) End Depth(ftKS). 10/14/2016 10/14/2016 1.00 COMPZN RPCOMP HOSO P Verify Tag on Packer,Space out, LID 6,028.0 6,028.0 19:00 20:00 3 jts M/U 3 space out pups,jt 186 and hanger and landing jt. 10/14/2016 10/14/2016 1.25 COMPZN RPCOMP CRIH P Pump 210 bbls Corroision Inhibited 6,028.0 6,028.0 20:00 21:15 Sea Water 3 bpm 450 psi 10/14/2016 10/14/2016 0.50 COMPZN RPCOMP RURD P Blow down lines drain and flush stack. 6,028.0 6,028.0 21:15 21:45 10/14/2016 10/14/2016 0.50 COMPZN RPCOMP THGR P Land on Hanger,RILDS,Test seals. 6,028.0 0.0 21:45 22:15 10/14/2016 10/15/2016 1.75 COMPZN RPCOMP PRTS T Pressure test tubing t/3000 psi f/15 0.0 0.0 22:15 00:00 min,bleed tubing to 1500 psi shut in, Pressure up on IA t/2500 psi f/30 min, IA psi dropping and tubing psi climbing,Bleed off,pressure up tubing to 3000 psi bleed off to 1500 psi shut in,retest IA t/2500 psi same results,Bleed off test tubing to 3000 psi 70 psi dropin 15 min 10/15/2016 10/15/2016 1.00 COMPZN RPCOMP CIRC P Shear out SOV.Test tubing by IA to 0.0 00:00 01:00 2500 psi-chart for 30 mins.-Pass. 10/15/2016 10/15/2016 1.00 COMPZN RPCOMP MPSP P Lay down landing joint,set BPV and 01:00 02:00 test to 1000 psi/10 mins. 10/15/2016 10/15/2016 1.50 COMPZN WHDBOP NUND P ND BOPE 02:00 03:30 10/15/2016 10/15/2016 3.00 COMPZN WHDBOP NUND P NU tree,test tubing adapter void 03:30 06:30 250/5000 PSI. 10/15/2016 10/15/2016 0.75 COMPZN WHDBOP MPSP P Pull BPV,install test plug 06:30 07:15 10/15/2016 10/15/2016 0.50 COMPZN WHDBOP PRTS P Test Tree 250/5000 psi/10 mins 07:15 07:45 Pull Test plug 10/15/2016 10/15/2016 2.00 COMPZN RPCOMP FRZP P PJSM-R/U LRS to freeze protect the 07:45 09:45 well using 80 bbls of diesel. 10/15/2016 10/15/2016 1.00 COMPZN RPCOMP FRZP P U tube well 09:45 10:45 10/15/2016 10/15/2016 0.50 COMPZN WHDBOP MPSP P Set BPV 10:45 11:15 10/15/2016 10/15/2016 0.75 MIRU MOVE MOB P RDMO-Rig release @ 12:00 Noon. 11:15 12:00 Page 10/10 Report Printed: 10/20/2016 w., KUPOD 1 L-15 CQn(cpPhillipKj a Well Attrib Max Ang D TD °�'± Wellbore APIIUWI Field Name Wellbore Status ncl(°) MD(ftKB) Act Btm(ftKB) Aldska.lrlc " ConocoPhllbps 500292120400 KUPARUK RIVER UNIT PROD 46.58 6,700.00 6,705.0 ... Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date 16-15,YU75/201612;18,23 PM SSSV:NONE 50 12/21/2015 Last WO: 10/15/2016 34.80 10/24/1984 Varocaischematic.(actual) Last Mod By End Date 1 1 , , • • • •• pproven 11/15/2016 PRONG,SET X-LOCK&INNER WEDGE Hanger;27.6 fI 1 _ escription OD(in) ID(in) Top(ftKB) Set Depth OMB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread • •, •• 161 1 102.0 102.0 1 1WELDED ,�, Id Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ttK8) Set Depth(ND)... WtlLen(I...Grade Top Thread SURFACE 95/8 8.921 34.3 3,475.0 3,474.7 36.00 J-55 BTC Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(T/D).. WELen(I...Grade Top Thread PRODUCTION 7 6.276 34.3 6,704.0 6,265.1 26.00 J-55 II Tubing Strings CONDUCTOR;35.0-102.a- I�II ITubing Description String Ma...ID 1'012 '01 Top(ftKB) Set Depth(ft..Set Depth(TVD)(...Wt(Ib/ft) Grade Top Connection TUBING Upper 3 112 2.992 0.0 6,285.31 5.962.4 9.30 L-80 EUE 8rd Mod ri Completion Gas LA,2,4246 Completion Details I Nominal ID Top(ftKB) Top(ND)(ftKB) Top!noir) Item Des Com (in) 27.6 27.6 0.00 Hanger Tubing Hanger,FMC TC-1A-EN,7-1/16"x 3-1/2"EUE 2.950 SURFACE,34.3-3,475.0-+ 1 1 8rd Box x Box 6,027.5 5,755.8 35.60 Locator Locator Sub,Baker,GBH-22 3.000 Gas Lire;3,494.0 '''.: 6,028.5 5,756.6 35.56 Seal Assy Seal Assembly,Baker,80-40(Seal Assy 21.54'Total - 3.000 - -- Length)6III ,035.3 5,762.2 35.26 PBR PBR,Baker,80-40(shear release pinned at 40K) 4.000 IS 6,079.6 5,798.4 35.44 Nipple X Nipple,HES,2.813" 2.813 Gas Lift,4,3736 6,213.3 5,906.0 37.51 Carbide Blast Blast Joint.9.3#L-80 3%EUEM box x 3%HYD 511 pin, 2.992 I Rings Top Blast Rings 6,226'MD 1.11 6,245.0 5,931.0 38.30 Carbide Blast Blast joint 3%9.3#L-80 HYD 511 box x pin,Top Blast 2.992 Rings Rings 6,272'MD Gas Ulf 5062.8 6,283.8 5,961.3 39.27 Locator Locator Sub,Baker,GBH-22 3.000 I I 6,284.3 5,961.6 3928 Seal Assy Seal Assembly,Baker,80-40(seal assembly 11.77') 3.000 (SHEARED) Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(NGrade ) Set Depth(ft.. D)(...Wt(lb/ft) Top Connection Gas Let,5,594.6 TUBING Lower 1 5.96 2.992 6,285.3 6,345.41 6,008.4 1 18rd EUE Completion Completion Details • Nominal ID Top(ftKB) Top(ND)(ftKB) Top Incl(°) Item Des Com (in) Gas Lin;6670.7 `; 6,285.3 5,9624 39.30 Packer Baker"F"Production Packer 4.000 al 6,288.6 5,965.0 39.39 SBE Baker 80-40 12.26'SBE 4.000 ill 6,298.0 5,972.2 39.62 XO Reducing XO 2.920 Locator;6,027.56,307.8 5,979.7 39.86 Deployment Upper Wedge Assembly#2 2.992 Seal Assy,0,028.5 Sleeve PBR;6,035.3 5511 6,321.8 5,990.4 40.21 Nipple GX Nipple,HES,2.813", SN:7256 2.813 Packer(Tubbg);6,957.7 6,327.5 5,994.8 40.35 Deployment Lower Wedge Assembly#1 2.992 Sleeve ;T 6,341.5 6,005.4 40.69�Nipple GX Nipple,HES,2.813" 2.813 it 6,344.9 6,008.0 40.77 Mule Shoe WLEG 4.57"OD x 3 ID.Drifted 2.91". 2.992 14 Gas Let,6,122.9 Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) Top(TVD) Top Incl Des Com Run Date ID(in) 6,330.0 5,996.7 40.41- INNER INNER WEDGE. OAL=40,OAL=380 LBS,MAX 10/26/2016 II WEDGE TOOL OD=2.70" Gas Lin;8194.7 I 6,005.1 1.: GUAGES 2.81"X-LOCK w/FLOW THRU SUB(NO PKG/ 10/22/2016 29.5"OAL) Carbide Blast Rings,6,213.3 , I:1 ' Fish Packer 8 tubing tail from 6313'milled and chased 10/11/2016 IPERF,6,736.06,248.0-- I6,480.0 down to 6480'.Prior to Setting Tandem Wedge 8 F r Perm Packer CarbiIPERFdeBlast',6,24Rings;6,8.06,245 268.0.0 N__. 1 0 6,136.9 44.24 FISH JK Running Tool 4.5"x 1.2"OD,lost 8/24/2004 8/24/2004 -: 6,526.0 6,141.2 4438 FISH Parts of 2 Broken GL In Rathole;Also Trash around 2/14/1990 Mandrels Locator;6,283.8 Seal Assy,6,284.3 Perforations&Slots Shot Packer;6,285.3 Dens SBE;6,288.6 rt. Top(ND) Btm(TVD) (shoal Top(ftKB) Btm(ftKB) (ftKB) (ftKB) Zone Date ft) Type Com 6,235.0' 6,248.0 5,923.1 5,933.4 C-4,1L-15 3/7/1985 12.0 IPERF 5"Scalloped Guns,120 deg.phasing Deployment Sleeve,6,3078 16 6,248.0 6,268.0 5,933.4 5,949.0 C-4,1L-15 3/7/1985 12.0 IPERF 5"Scalloped Guns,120 I deg.phasing Nipple;6,321.8 T_ 6,393.0 6,416.0 6,044.1 6,061.2 A-5,1L-15 3/7/1985 4.0 (PERF 4"JJ II,120 deg. phasing Deployment Sleeve,6,327.5 Mandrel Inserts INNER WEDGE;6,330.0 St i �l Top(ND) Valve Latch Port Size TRO Run GUAGES;6,341.0. N Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Corn Nipple;6,341 5 i:. 2,424.5 2,424.3 Camco MMG 1 1/2 GAS UFT DMY RK 0.000 0.0 10/14/2016 3,494.0 3,493.7 Camco MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 10/18/2016 Mule Shoe,6,344.9 4,373.6 4,337.8 Camco MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 10/14/2016 (PERF;6,393.0-6,416.0 5,062.9 4,944.3 Camco MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 10/14/2016 5,594.6 5,400.6 Camco MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 10/14/2016 Fisk 6,480.0 5,970.7 5,709.3 Camco MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 10/14/2016 FISH,6,520.0 6,122.9 5,833.6 Camco MMG 1 1/2 GAS UFT DMY RK 0.000 0.0 10/14/2016 FISH,6,526.0 © 6,194.2 MMG 1 1/2 GAS LIFT DMY ® 0.000 0.0 10/14/2016 PRODUCTION;34.3-6,704.0 b„. ,, x � KUP JD • 1 L-15 Conoco-Phillips � , Alaska Int:, Gonocanhilhps ; 1L-15,it/15/2171812:78:23 PM L Verbcai schematic./ac9 Hanger;27.6 tom'I,--.:t Notes:General&Safety ItEnd Date Annotation 10/1/2003 NOTE:WAIVERED WELL IA x OA ANNULAR COMMUNICATION l10/1/2010 NOTE:View Schematic w/Alaska Schematic9.0 10/15/2016 NOTE:WO .fin CONDUCTOR:35.0-102.0 I Gas Lift,2,424.5 if 1 SURFACE;34.3-3,475.0—. in Gas Lift;3,494.0 lin Gas LIR;4,373.6 I17It Gas Lilt 5,062.8 Gas Lift;5,594.6 +r. Gas Lift;5,970.7 is Locator,6,027.5 � — Seal Assy;8,028.5 PBR;6,035.3 Packer(Tubing),6,057.7 ak 21 Gas Lift;6,122.9 II_ Gas LIft;6,194.2 Carbide Blast Rings;6213.3 IPERF;6,235.0-6,248.0—. IPERF;6,248.0-6,268.0 Carbide Biest Rings;6,245 0^ aro Locator,6,283.8 Seal Assy,8,284.3 Packer,6,285.3 SBE;6,288.6 '.� 1 Deployment Sleeve;6,307.8 ',, u. Nipple;6,321.8. Ii Deployment Sleeve,6,327.5 INNER WEDGE;6,330.0 , GUAGES;6,341.0. Nipple;6,341.5 E, I Mule Shoe,6,344.9 IPERF,6,393.08,416.0-- Fish,6,480.0 FISH;6,520.0 • FISH;6,526.0 4 PRODUCTION;34.38,704.0 0 r • 0 ° Ois > n ° oo L W W '�, v Lto -w ID O i-+ }� CDNZ O Q " - E o LLI LN u , j ....10 m 0 Q� V0 o. C E 0 wfte 0 Q::-c @ y Y r W (0 cD (0 (0 (0 co co CO (0 co (o �o_v1OQy QU UUUUUUUUUU *'N , onSJ cl C J, O . w c L V/ V) (VC -+ O O O O O O O O O O O Z° wM N M V 8 � 6 O O C m U - N TO U -C O. C U Z v > E -o v g O C 1r. +, v ,� c 3 O ❑ 0 0 Q 0 ❑ ❑ ❑ ❑ Q ❑ ❑ E N 75 Q) -, U (.4 a J J J J J J J J J J J J O y W W W W W W W W W W W W 0C F- LL LL LL LL LL LL LL LL LL LL LL LL a-+ a) a) v -0 CO Q J J J J J J J J J J J J cll - 'O +t+ LA ' ~ Q Q Q Q Q Q Q Q Q Q Q Q Q, vi C 4- - Z 0) a Z Z Z Z Z Z Z Z Z Z Z Z (, ro v 0 d, O °� ❑ LL LL LL LL LL LL LL LL LL LL LL LL = _ 0 C > 09 7 U1 tf m S U Z 4, I? a_ o a ~ � a o 0 ttl U 0" 15,�j N ) m > w U J I Q a1 fl- �n C O_ � p).4 r .' O 0 O 0 d - y U U ❑� 0U_ to , J i 04 d CK PCS y m a — O a a a) 00 0 .-' W et . N M M x > C,4c S RS a iIiIIIII1II ' ° d u i W (� M ^+ a J J J J J J J ° J J J J 1 0 L. i OF 1:CCZCeixteCCwXWccocce 1 Co Erit W W W W W W W W W W W W 3 w > > > > > > > > > > > > - z Y Y Y Y Y YYYYYYY 0 a' W LL' LLQ' a' LQ' a' W rt a) a+ w Q Q Q Q Q Q Q Q Q Q Q Q >> LL a a a a a a a a a a a a a > > > > > > > > > > > > m O irz'' YYYYYY YYYYYY C to as cc X in — WLn V N c0 h (O ti N O O N R 111. D 0 0 rn o o_ _O _O (o O rn (c L` n N- � ,e O O 0 M O O O O O O O O O O O O O O O O O Cl) CV � � O o 0 0 0 o O o 0 0 o O (� w 0 0 0 co' O LL. LL. Y LL LL LL LL - W ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 ❑ ❑ ❑ 0 casC (s) 9,e x to m u O LD 00 0 0 o Q o o O O O C O o O o 0 o 0 O 0 0 0 o pp V M O r O V N O N M N N "tA E _` O M O O (O O r r 01 O N (,- O IS, N O N M N V M N 0U ct- O N M N — O O N N N N N N N N N N N N N 1- ..Q Q N N N N N N N N N N N O 01 O O O O O O O O O O O 31 0 0 0 0 0 0 0 0 0 0 0 0 +, O a) L 4 In (n I() L() u) In In It) u) In Ln I) a U .� art . A v @ y z Z E aui a3 U d Q - c c To 9 0J y ,-4 Ln In M a Ln CO r O N Cr M 4-, Cl) +O+ d OI Z i+ ha O r r r r r N O O ++ E N I- LL Q N .,. J } J (Si N e- CO a ,— N N C co Z v f6 'o , . .6 I� C +' c0 ,) CZ ¢ @ L v m O N4 a � 0 a Z9 -12 WELL LOG TRANSMITTAL DATA LOGGED -1/R/2015 M K.BENDER To: Alaska Oil and Gas Conservation Comm. June 3, 2015 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 RECEIVED Anchorage, Alaska 99501 JUN 18 ZVI`, RE: Production Profile: 1L-15 ,AOGC Run Date: 5/26/2015 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 1L-15 Digital Data in LAS format, Digital Log Image file, Interpretation Report 1 CD Rom 50-029-21204-00 Production Profile Log 1 Color Log 50-029-21204-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Wireline &Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 SCANNED .1U L t) 2L11.) Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com eLedr-eee Im; ?roject Well History File' C( e XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ r_~ L_~_ ~ ~ *~ Well History File Identifier Organizing (done) RESCAN DIGITAL DATA Color items: [] Diskettes, No. [] Grayscale items: [] Other, No/Type [3/'"" Poor P~q" QI.U~I~I' h 5%t'q/~.~ Quality Originals: [3 Other: ~1-i¢i¢ 1~ ~ NOTES: BY: BEVERLY BREN y~NT SHERYL MARIA LOWEI~L Project Proofing BY: B~( BREN VINCENT SHERYL MARIA LOWELl. OVERSIZED (Scannable) [] Maps: [] Other items scannable by large scanner OVERSIZED (Non-Scannable) Logs of various kinds [] Other DATE: "~///'//~ ~... Is/ DATE: 7/~/~/SI ScaNning Preparation x30= BY: BEVERLY ~ VINCENT SHERYL MARIA LOWELL + = TOTAL PAGES DATE: ///~/g2~.~ Isl ~ Production Scanning Stage'PAGECOUNTFROMSCANNEDFiLE: ~__¢~/. ~ PAGE COUNT MATCHES NUMBER IN SCANNING/PREPARATION: YES . . NO Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES NO (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAl. ATTENTION IS REQUIRED ON AN IND~VIOUAL PAGE BASIS ReScanned (individual page [special attention] scanning completed) RESCANNEDBY.' BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: Isl General'Notes or Comments about this file: Quality Checked (done) 10125/02Rev3NOTScan ned.wpd ~~~~~~~~ Schlumberger -DCS 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # ~~ ~ -- Company: Alaska Oil & Gas Cons Comm ~~ti Attn: Christine Mahnken c,~ n~"~,I,t~~ ,~,~~ ~ .~f z~QB 333 West 7th Ave, Suite 100 '~ Anchorage, AK 99501 ~~ + ` Field: Kuparuk ~~ l Log Description ` Date BL Color CD 08/06/08 1 A-22 12097412 GLS - (p ~ 07/22/08 1 1 2G-04 12096519 PROD PROFILE - 07/23/08 1 1 1A-22 12097413 PROD PROFILE - ~ 07/23!08 1 1 1A-28 11996647 PROD PROFILE / 07/24/08 1 1 1A-25 11996648 - PROD PROFILE % 07/25/08 1 1 2A-OS 11996649 INJECTION PROFILE 07/26/08 1 1 1 E-112 12080408 INJECTION PROFILE 07/27/08 1 1 2W-05 12080409 INJECTION PROFILE 07/28/08 1 1 3J-10 12097408 SBHP SURVEY 07/20/08 1 1 3M-28 12097411 SBHP SURVEY C - d( 07/21/08 1 1 1 L-15 11982443 PROD PROFILE ~ 07/06/08 1 1 3O-08A 12080407 SBHP SURVEY Z °G.- Sq'} - (g3 { (per" 07/26/08 1 1 30-09 12080406 SBHP SURVEY /(p ~(p~ 07/26/08 1 1 1 L-24 11978468 PRODUCTION PROFILE { 07/26/08 1 1 1 F-17 12080410 PRODUCTION PROFILE ? (p 07/29/08 1 1 30-11 12100430 SBHP SURVEY ..p~/ 07/31/08 1 1 2M-06 12100433 INJECTION PROFILE - 08/02/08 1 1 1H--~', O5f 12100434 INJECTION PROFILE UZ ^~ ~ "~ {0 08/03/08 1 1 UGNU DS2-OBi 11996650 TEMPERATURE LOG - 07/27/08 1 1 2X-14 12100432 LDL G .- 08/01/08 1 1 1 F-20 12100435 PRODUCTION PROFILE / 08/04/08 1 1 iH-09 12100436 INJECTION PROFILE U 08!05/08 1 1 • • Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. lL-15 (PTD 184-183) report ofSCP e e Tom & Jim, j~ CÝ<.- ~ 1L-15 (PTO 184-183) gas lifted producer is suspect for TxlA communication due to high IA pressure V while the well is shut-in. The well was SI for gas handling facility limitations on 5/9/06. The IA pressure increased to +2000 psi while the well was SI indicating TxlA communication. The GLVs were installed in 1/2004 and are the suspected leak point. Slickline will troubleshoot the TxlA communication and replace any leaking GL Vs. Attached is a schematic and a 90 day T/I/O plot. Please let me know if there are any questions. Marie McConnell Problem Well Supervisor 659-7224 "·C·· ... N;\\ED ... .,. . 4"'1 , «1 L-15.pdf» «1 L-15 90 day TIO plot 5-19-06.gif» Content-Description: 1L-15.pdf lL-15.pdf Content-Type: application/octet-stream Content-Encoding: base64 lL-15 90 day TIO plot Content-Description: 1L-15 90 day TIO plot 5-1 Content-Type: image/gif Content-Encoding: base64 1 of 1 5/22/20063:55 PM e e KRU 1 L-15 API: 500292120400 Well Tvoe: PROD Annie {@ TS: 38 deo @ 6216 SSSV Tvoe: LOCKED OUT Orio Comoletion: 10/24/1984 Annie {@ TD: 47 deo @ 6705 SSSV Annular Fluid: Last W/O: Rev Reason: Tan fill set CVs (1883-1884, Reference Lan: Ref Lon Date: Last Uodate: 9/19/2004 00:2.875) Last Tao: 6525 TD: 6705 ftKB Las.ate: 9/11/2004 Max HOle~05 Gas lift 1 DescriDtion I Size 1 Too Bottom 1 TVD I Wt Grade 1 Thread MandrelNal\le 1 CONDUCTOR 1 16.000 I 0 102 102 I 62.50 H-40 I 1 1 ~ 1 9.625 I 0 3475 T 3475 -r 36.00 J-55 1 (1922-1923, 1 7.000 0 6704 T 6269 1 2/ i.OO J-55 1 Gas lift Size TOD -I Bottom 1 TVD 1 Wt I Grade Thread MandrelNal\le 2.875 0 -I 6334 1 6004 1 6.50 1 .1-';<; 8RD 2 IItRimtr" (3400-3401 , Interval TVD Zone 1 Status I Ft 1 SPF I Date 1 Tvne Comment 6235 - 6268 5927 - 5953 C-4 \ I 33 I 12 I 3m1985 IPERF 5" Scalloped Guns, 120 deg. Gas lift I ohasino MandrelNal\le 6393 - 6416 I 6048 - 6065 A-5 T 23 1 4 T-3/7/1985 T IPERF 4" JJ II. 120 deQ. phasinQ 3 'Ø!s>l2l1, (4394-4395, St MD TVD Man Mfr Man Type V Mfr V Type VOD Latch Port TRO Date Vlv Run Cmnt 1 1922 1922 Cameo KBMG GLV 1.0 BK-2 0.156 1350 1/18/2004 2 3400 3400 Cameo KBMG GLV 1.0 BK 0.188 1325 1/19/2004 3 4394 4360 Cameo KBMG OV 1.0 BK 0.188 0 1/19/2004 4 5392 5233 Cameo KBMG DMY 1.0 BK 0.000 0 12/15/1995 5 6033 5765 .. KBMG DMY 1.0 BK 0.000 -0 .4 St MD TVD Man Mfr Man Type V Mfr V Type VOD Latch Port TRO Date Vlv Run Cmnt 6 6119 5835 Cameo KBMG CV 1.0 BK 0.000 0 9/12/2004 7 6187 5889 Cameo KBMG CV 1.0 BK 0.000 0 9/12/2004 PBR 8 6296 5975 __ CV BK 0.000 -6 _4 (6070-6071, 00:2.875) Depth TVD TVDe DescrTotion ID 1883 1883 SSSV Cameo'TRDP-1-SSA' (Locked Out 1/28/94) 2.313 SSSV Waivered 10/13/95 PKR 6070 5795 PBR Baker 2.400 (6082-6083, 6082 5805 PKR Baker 'FH' 2.441 00:6.156) 6313 5988 PKR Baker'D' 3.250 6328 5999 NIP Cameo 'D' NiDDte NO GO 2.250 6333 6003 SOS Baker 2.441 6334 6004 TTL 2.441 Production }} MandrelNalve 6 Depth 1 Description 1 Comment 1 (6119-6120, ~ 4.5" x 1.2" OD, lost 8/24/2004 I of 2 Gl !}m}}}}m:~und Mandrels 1 Production MandrelNal\le Date Note 7 10/1/2003 1 WAIVERED WELL: IA x OA ANNULAR COMMUNICATION (6187-6188, ~ - ------ - -----. = = ~ - c. ~ Perl - - (6235-6248) .-----" ... ...0. - - ...- --.-. Production MandrelNalve 8 (6296-6297, PKR (6313-6314, 00:6.156) NIP (6328-6329, 00:2.875) TUBING (0-6334, 00:2.875, 10:2.441) Perf m"m m..... (6393-6416) "m ....m.. - - - - . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown~ Stimulate X Plugging Pull tubing ~ Alter casing ~ Repair well ~ Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development Exploratory Stratigraphic Service 4. Location of well at surface 387' FNL, 143' FEL, Sec 31, T11N, R10E, UM At top of productive interval 1140' FNL, 1022' FEL, Sec 31, T11N, R10E, U .b~l At effective depth ~.¢I_.!% ~ i '~ 1304' FNL, 1237' FEL, Sec 31, T11N, R10E, UM At total depth 1341' FNL, 1285' FEL, Sec 31, T11N, R10E, UM 12. Present well condition summary Total Depth: measured true vertical 6704 feet 6267 feet 6. Datum elevation (DF or KB) RKB 118 7. Unit or Property name Kuparuk River Unit 8. Well number 1L-15 9. Permit number/approval number 84-183 10. APl number 5o-029-21 204 11. Field/Pool Kuparuk River Field/Pool Plugs (measured) None feet Effective depth' measured 6 6 21 true vertical 621 0 feet feet Junk (measured) None Casing Length Structural Conductor 7 9' Surface 34 49' Intermediate Production 6 6 7 3' Liner Perforation depth: measured 6235'-6268', true vertical 5925'-5951', Tubing (size, grade, and measured depth) 2.875", 6.5#, J-55@ 6332' Packers and SSSV (type and measured depth) Size 16" 9.625" 7" Cemented 214 Sx CS II 1025 Sx AS III & 700 Sx Class G CMT 275 Sx Class G & 250 Sx AS I Measured depth True vertical depth 6393'-6416' 6046'-6067' 102' 102' 3475' 3475' 6704' 6256' ~,% !:"'~' /'~ ii" .¢,: t ~ .. -', :. : , : . ;:., -: ',~' ~.. : !",: L, :'-,'.:.- :: ~· , · Pkr: Baker 'FH' @ 6080', Baker 'DB' @ 6311'; SSSV: Camco TRDP-1SSA (locked out) @ 1797' 13. Stimulation or cement squeeze summary Re-Fracture "A" Sand on 11/30/95. Intervals treated (measured) 6393'-6416' Treatment description including volumes used and final pressure Pumped 31 Mlbs 20/40 & 12/18 ceramic proppant into formation, fp was 5143 psi. 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 7 3 0 1130 201 Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 368 117 58 1150 249 16. Status of well classification as: Oil X Gas ~ Suspended ~ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form '10-404 Rev 06/15/88 Title Wells Superintendant SUBMIT ~'N DUPLICATE ARCO Alaska, Inc. KUPARUK RIVER UNIT WELL SERVICE' REPORT '~ K1(1L-15(W4-6)) WELL JOB sCOPE JOB NUMBER ,, 1L'15 .FRAC, FRAC SUPPORT 1126951557.8 , DATE DAILY WORK UNIT NUMBER 11/30/95 PUMP "A" SANDS FRAC. COM L E I S C ESS ,- 'SU E V,SO 3 ~Yes ON°! OYes ~No JOHNS FIELD AF~ ~ DALLY COST ACCUM COST t;~~ ESTIMATE 998509 23ODS10LL $82,025 $90,690 Initial Tb~ ~ress Final Tba P re~ Initial Inner Ann Rn~ Inner Ann J Initiai Ou ~ 500 PSIS, 3000 PSI 800 PSI 1200 PSI~ 50 PSIJ 100 PS! DALLY SUMMARY AND 30,722 12/18 WITH 737 BBLS OF FLUIDS PUMPED. WELL SCREENED OUT WITH MAX. PRESSURE OF 5143 PSI PUMPED "A" SANDS FRAC. PUMPED 31,000 # PROPPANT IN PERFS. AND LEFT 7,722# PROPPANT IN PIPE. TOTAL OF 8,000~ 20/40 TIME 07:00 LOG ENTRY MIRU FRAC EQUIP. , HOT OIL AND APC VAC. TRUCK 09:00 09:45 09:45 09:56 09:59 10:01 10:03 11:12 11:2~ 11:21 HELD SAFETY MEETING, ON JOB PROCEDURE. PRESSURE TESTED UNES TO WELL TO 6125 PS! START PUMPING CONDITION STAGE AT 20 BPM AND 5364 PSI, TOTAL -180 BBLS PUMP SCOUR STAGE W/1PPA 20/40 PROP. TOTAL 2000 # AT 20 BPM AND 4842 PSI PUMP CONDITION STAGE AT 20 BPM AND 4494 PSI TOTAL OF 34 BBLS. PUMP FLUSH Of 37 BBLS SEAWATER ATR 20 BPM AND 4462 PSI SHUT DOWN FOR ISIP AND F~RCE CLOSURE PUMP 50 BBLS DISPLACE AT 5 BPM AND 2662 PSI PUMP 13 BBLS DATA FRAC AT 15 BPM AND 3885 PSI 11:24 13:09 PUMP 39 BBLS OF PAD AT 5 BPM AND 2563 PSI PUMP 26 BBI_S OF PAD AT 15 BPM AND 3885 PSI 13:16 13:17 PUMP 37 BBLS FLUSH OF SEAWATER AT 15 BPM AND 3885 PSI. SHUT DOWN FOR ISIP AND DATA FRAC ANALYSIS PUMP 2# PPA STAGE TOTAL 7720 # 20/40 PROPPANT AT 15 BPM AND 3885 PSI 13:24 PUMP 30,000~ 12/18 PROPPANT UP TO 5.0~ PPA, WELL SCREENED OUT WITH MAX TREAT PRESSURE OF 5143 PSI .. . ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 Date: October 20, 1987 Transmittal #6088 RETURN TO: .- ARCO Alaska, Inc. Attn: Kuparuk Records Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted herewith are the following items. Please acknowledge receipt and return one signed copy of this transmittal. lA-8 Static BHP Bottom-Hole Pressure Survey 9-29-87 x~ 3A-4 Kuparuk Well Pressure Report (Otis) 9-27-87 ~-.2B-4 Pressure Build Up Test 10-13-87 ~lL-2 Kuparuk Well Pressure Report(Otis) 9-6-87 ~-lL-15 Kuparuk Well Pressure Report(Camco) 6-9-87 ~ 1L-8 Kuparuk Well Pressure Report(Camco) 6-9-87 50-029-20313 'A' Sand Static 'C' Sand 02157 Static Static 'C' Sand 'C' Sand Receipt Acknowledged: DISTRIBUTION: D~ Oil & Gas Cons. Commisslori D&M State of Alaska BPAE Chevron Mobil SAPC Unocal ARCO Alaska, Inc. is a Subsidiary of AllanlicRichfieldCompany ARCO Alaska, I', Post Office ~ox 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 July 28, 1987 Ms. Fran Jones Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' Miscellaneous GCT Surveys Dear Fran' Enclosed are additional copies of the following GCT surveys' 1L-6 2A-2 1L-15 2A-3 1L-16 2A-4 L1-1 2D-11 L2-28 2D-12 2G-8 2G-10 2G-13 If you have any questions, please call me at 263-4944. Sincerely, ;]. Gruber Associate Engineer JG'pk JG/78 Enclosures R£C£1v£D 'Alaska Oil & Gas Cons. Commisslou Anchorage ^riCO Alaska, Inc. is a Subsidiary of AllanlicRicl]fiehlCompany ARCO Alaska, inc.f - Post Offic( .100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 DAT~.': 10-22-85 TPJ~NSMITTAL NO: 5410 RETURN .TO: ARCO ALASKA, INC. KUPARUK OPERATIONS ENGINEERING ~ '~ RECORDS CLERK . _ ATO-1115B .- - = ~-_--- - P.O. pOX 100360.~. ' : ANCHORAGE, AK 99510 TRANSMITTED. HEPJ-.~ITH ARE Trt~ FOLLOWING ITEm, S. RECEIPT AND RETURN ONE SIGNED COPY OF THIS TRANSHITTAL. FINAL PRINTS/ SCHL/ ONE * oF EACH CEMENT. BOND LOG/ :'~3B- 8 06-06-85 ~ 42X-15 11-07-.84 '~2X-13 -11-17-84 ~2X-12 12-08-84 VARIABLE .RUN #l RUN ~1 ~UN ~l - RUN %1 ~2X-ll -%2X-10 '~ 2X-9 '~ 2W-6 '~2V-16 12-08-84 RUN 12-21-84 RUN 12-20-84 RUN -_ 11-25-85 RUN 06-06-85 · RUN "~ 2V-15 06-07-85 - ' RUN ~'2V-13- :::- 06-03-85. RUN DENSITY 5850-8369 5900-8258 5896-8410 3050-7215 #1 310U-6370 #1 3350-6973 ~t 5100-8338 ~1 5700-7290 $1 4550-710~ %1' 4650-6428 %1 6590-8553 -~r2U-8 /-- :(-:. 04-02-85 - RUN ~"'2U- 4 :".~ i:-:::- 2D-16 ~' ~2D- 1 . '.. WlR_8 ' -~. ' ~"iR- 7 '.. ~-15.J-:: 11-05-84 ~1Q-15 -:::: 05-27-85 '~1~3 ~:-".~. 04-17-85 '~PF-1A' ~2-21-84 03-31'85 'RUN 04-01-85 -~:. i~UN 03-02-85 ~"~i:. i~UN 12-19-84 RUN 12-18-84 RUN 11-03-84 - RUN 06-17-85 RUN 06-08-~5 ~{UN 06-08-85 I{UN RUN RUN -l~UN ~UN PLEAS~ ACKNOWLEDGE 4970-6938~_ ~-:- .~. 0070-~122 =-~: . ._. 5600-8107 ' - 5994-9161 .... -'- ' :/ :.'="." - . 6284-7850 5200-7469 ' 3285-6454" ' 5693-6652 5987-8324 4302-7028 6950-8628 48'83-6600 - . 6490-7566 ' 897~-10744 2200-3856 Ch:~4ENT ~VALUATION LOGS 6400-7002 600U-8246: 6500-8726 5400-7457 LUGS/. %1- 8269-8712 6974-8~44 8254-8532 5790__9450 cEMENT 'EVALUATION TOOL 1F-'16 ~i.. 03-12-85 RUN · ~-'lk-5'i ~:~/-: 06-26-85 'RUN #1 ~.lR-5 i. ~]]='!:!.(i 06-27-85'-!=. RUN _#2-"' ~'2U- 2 :?~!!":. 03- 2 5- 8 5:'~ ::: RUN ~ 1 -~2U-15='~=-.03-07-85 . RUN ~1 ~3B-9 '- ~-.~j! 06-30-85 .~ RUN %1 ~3C-11,'~ 06-29~85. ~ ~ RUN %1 ' ~3C'12:'~;~ 06-29-85-'.;. RUN ~1 . ~CEIPT ACKNOWLEDGED: ' BPAE ~ '":-:-:~:(.~ DRILLIN~*BL .. B.. CURRIER~.-~ '~." L. JOHNSTON. CHEVRON. - ~4OBIL ' .... - NSK CLERK* DL D & M -': -.. ' ' -. _ . . . .. · W. PASH~K EXXON PHILLIPS OIL J: RATHmELL'- ARCO Alaska, Inc. is a Subsicliary of AllanlicRichfiei0Company SOHIO 'ONION VAULT/~O*FIL~ ~v ARCO Alaska. Inr Post Office ,~ux 100360 Anchorage. AJaska 99510-0360 Teiephone 907 276 1215 June 24, 1985 ~4r. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton. Attached in duplicate are subsequent notices followin9 wells at the Kuparuk River Field- Well Action Date Performed 1A-3 Fracture 5 / 30 / 85 1A-4 Fracture 6/1 /85 1C-5 Perforate 4/27/85 1 E-3 Perforate 3 / 28/85 1E-3 Fracture 4/3/85 1 E-4 Per forate 4 / 20 / 85 1E-4 Fracture 5/7/85 1E-1 6 Fracture L~/ 14/85 1E-1 7 Fracture 3/26/85 1 E-29 Fracture 4 / 12 / 85 1F-16 Perforate 4/11/85 I F-1 6 Fracture 4/15/85 1G-1 Fracture 4/1 /85 1L-15 Fracture 3/31 /85 1L-16 Fracture 3/31 /85 1Q-1 Fracture 5/31/85 1Q-4 Acidize 5/1 7/85 1Q-4 Fracture 5/31/85 lQ-5 Fracture 5/1/85 1Q-6 Fracture 4/1 9/85 1Q-7 Fracture z~/27/85 1Q-7 Acidi ze 5/26/85 2C-1 0 Perforate 4/21 /85 2D-3 Ac idize 5/11 /85 2W-1 3 Ac idi ze 5/20/85 2X-1 2 Ac idi ze 5 / 12/85 on the If you have any questions, please T. B. Drumm Kuparuk Operations Coordinator TMD / kmc Attachment (Dupiicate) cai i me at 263-421 2. RECEIVED Alaska O~t & (Sas Cons. Commission Anchorage ARCO Alaska. Inc. is a Subsidiary of A!lanlicRichfieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CL, MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator ARCO ALASKA, INC. 3. Address P. O. BOX 100360, ANCHORAGE, ALASKA 99510 4. Location of Well SURFACE LOCATION: 387' TllN, R10E, UM FNL, 143' FEL, SEC. 31, 5. Elevation in feet (indicate KB, DF, etc.) 118' (RKB) 6. Lease Designation and Serial No. ADL 25659, ALK 2585 7. Permit No. 84-183 8. APl Number 50-- 029-21204 9. Unit or Lease Name KUPARUK RIVER UNIT 10. Well Number 1L-15 11. Field and Pool KUPARUK RIVER FIELD KUPARUK RIVER OIL POOL 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation ~] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). On March 31, 1985, the "A" sands of Kuparuk well 1L-15 were hydraulically fractured and propped to improve production. The treatment consisted of 346 BBLS of gelled water as pad and carrying fluid and 14,154 LBS of 100 mesh and 20/40 sand as proppant. 26 BBLS of gelled diesel was used as a flush. Prior to pumping, equipment and lines were tested to 5000 psi. 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. KUPARUK Signed j. /~'f.~.~ ~-,~"~,-'~.~.~ Title OPERATIONS COORDINATOR The space below for Commission use 6/19/85 Date Conditions of Approval, if any' Approved by COMMISSIONER By Order of the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office Bo}.; ,,00360 Anchorage, Alaska 99510-0360 Telephone g07 :~_7~ i2415 June ].8, ].985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT- 1L-15 Dear Mr. Chatterton- Enclosed is a copy of the 1L-15 Well History (completion details) to include with the Well Completion Report, dated 04/19/85. If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU9/L76 Enclosure cc' 1L-15 Well File ARCO Alaska, inc, is a Subsidiary of AtlanticRichfieldCompany ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. I Accounting cost center code District County or Parish [ State AlaskaJ Alaska Field Kuparuk River Auth. or W.O. no. AFE 204188 Lease or Unit Title North Slope Borough ADL 25659 Completion IWell no. 1L-15 Nabors i-ES API 50-029-21204 Operator Spudded or W.O. begun Workover Date and depth as of 8:00 a.m. ARCO Alaska, Inc. Date Complete record for each day reported A.R.Co. W.I. 56.24% 3/6/85 I otal number of wells (active or inactive) on this cst center prior to plugging and bandonment of this well I our 1500 hrs Prior status if a W.O. 3/07/85 3/08/85 3/09/85 thru 3/11/85 7" @ 6704' 6621' PBTD, Perf'g 10.1 ppg brine Accept ri$ @ 1500 hrs, 3/6/85. ND tree, NU & tst BOPE. RU WL to perf. RIH w/4" csg gun, 4 SPF, 120° phasing, perf f/6393'-6416'. RIH w/5" csg gun, 12 SPF, 120° phasing, perf f/6248'-6268'. 7" @ 6704' 6621' PBTD, Lnd tbg 10.1 ppg brine Perf w/5" gun, 12 SPF, 120° phasing f/6235'-6248'. RIH w/gage ring/JB. PU pkr & tailpipe assy, set @ 6311'. RIH w/2-7/8" completion, lnd tbg. 7" @ 6704' 6621' PBTD, RR 10.1 ppg brine Drop ball, shear sub, shear out of PBR. Lnd tbg. Set BPV. BOPE, NU & tst tree. Displ well to crude. RR @ 1230 hrs, 3/9/85. Bkr "D" Perm Pkr @ 6312.97' - Camco "D" Nipple @ 6327.70' Shear Sub @ 6333.21' - FH Pkr @ 6082.37' Old TD New TD PB Depth 6621 ' PBTD Released rig Date Kind of rig 1230 hrs. 3/9/85 Rotary Classifications (oil, gas, etc.) Type completion (single, dual, etc.) Oil Single Producing method Official reservoir name(s) Flowing Kuparuk Sands Potential test data Well no. Date Reservoir Producing interval Oil or gas Test time Pr°ducti(~n'~r Oil on test Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable corrected The above is correct Signature Date ITitle .~,~,,~ ~~ . 4/11/85 For form pr;p~ration anf~stri{~'ution,- see Procedures Manual, Section 10, Drilling, Pages 86 and 87. Drilling Superintendent ADDENDUM WELL: 1L-15 11/06/84 RU. RIH w/CBL/GR, log 6660'-4880'. RIH w/gyro to 6618', log back to surf. Drillin~ Superintendent 9ate ARCO Alaska, Post Office Box 100360 Anchorage. Alaska 99510-0360 Telephone 907 276 1215 DATE: 05-2 3-85 ~ ~ ~. 5197 ~RANS.~ITTAL NO: RETURN TO: ARCO ALASKA, INC. KUPARUK OPERATIONS ENGINEERING RECORDS CLERK ATO-1115B 'P.O. BOX 100360 ANCHORAGE, AK 99510 TRANSMITTED HERE%TITt{ ARE TItE FOLLOWING ITEMS. PLEASE ACKNOWLEDGE RECEIPT AND RETURN ONE SIGNED COPY OF THIS TRANSMITTAL. FINAL PRINTS OPEN HOLE/SCHLUMBERGER (ONE * OF EACH LISTED.) 2V-~9 ~/ 5" DIL/SFL-CR 03-24-85 RUN ~1 3617-8089 2" DIL/SFL-GR 03-24-85 RUN ~1 3617-8089 5" DEN/NEU-GR (PORO) 03-24-85 RUN #1 5700-8064 2" DEN/NEU-GR (PORO) 03-24-85 RUN ~1 5700-8064 5" DEN/NEU-GR (RAW) 03-24-85 RUN ~1 5700-8064 2" DEN/NEU-GR (RAW) 03-24-85 RUN ~,1 5700-8064 CYBERLOOK 03-24-85 RUN 91 5700-8064 1L-15 2U-8 2D-1 ~" D'~r./S~.'T ~ 10-2° °4 RUN ~,1 3477-6694 2" DIL/SFL-GR 10-23-84 RUN ~1 3477-6694 5" FDC/CNL-GR (PORO) 10-23-84 RUN ~1 6000-6654 2" FDC/CNL-GR (PORO) 10-23-84 RUN #1 6000-6654 5" FDC/CNL-GR (RAW) 10-23-84 RUN #1 6000-6654 2" FDC/CNL-GR (RAW) 10-23-84 RUN #1 6000-6654 5" BHC SONIC 10-23-84 RUN ~1 6000-6684 2" BHC SONIC 10-23-84 RUN ~,1 6000-6684 CYBERLOOK !0-23-84 RUN #1 6000-6654 5" DIL/SFL-GR 03-28-85 RUN #1 3025-6934 2" DIL/SF'L-GR 03-28-85 RUN #1 3025-6934 5" DEN/NEU PORO 03-28-85 RUN ~1 3025-6910 2" DEN/NEU PORO 03-28-85 RUN ~1 3025-6910 5" DEN/NEU RAW 03-28-85 RUN #1 3025-6910 2" DEN/NEU RAW 03-28-85 RUN ~,1 3025-6910 CYBERLOOK 03-28-85 RUN #1 6590-6880 5" DIL/SFL-GR 10-27-85 RUN 2" DIL/SFL-GR 10-27-85 RUN 5" DEN/NEU PORO 10-27-85 RUN 2" DEN/NEU PORO 10-27-85 RUN 5" DEN/NEU RAW 10-27-85 RUN 2" DEN/NEU RAW 10-27-85 RUN CYBERLOOK 10-27-84 RUN RECEIPT ACKNOWLEDGED: BPAE *DRILLING-BL B. CURRIER L. JOHNSTON CHEVRON MOBIL D & M*-BL W. PASHER EXXON PHILLIPS OIL *NSK CLERK-BL *J. RATHMELL-BL ~2 2469-6748 ~,2 2469-6748 ~2 2649-6722 ~2 2649-6722 ~2 264~-672~ #2 DATE: *STATE SOHIO UNION *K TULIN/VAULT=TI~,Lt'i ARCO Alaska, Inc. Post Offi( ,x 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 · ~ ,-) DATE' AF'RI'I_ ~.., TRAN,.~H T. TTAL NO' ':'- i 4 c, r-" 1' [..! I'R l'-! 'F O ' ¢ ' NC ARCO P~I...A~kA, ~ , A'FTN- RECORDS'. CI...,E.=RI< AT[).-i i i ."SB F:', (:)~ !':'.OX i 0 ':1:' :'.", 6 C:' AN[.'.Fi(]I.';:A(.i. IE, Al< <..--"?':.St ¢ 'F IR A H ?T fi :[ 'F T E !) I--IE:F:,'E.-E[.;J]:T'I--I Al:cE.' THE F'[)I...I. OU]:NF.., Z'FEH~?, F'LEA,~'E AC'KN('JU/_E.D(;E I:;;IE(TEZF'T ;~i',!!)IRETURN (]Nli:'. ,."7.,T. GNIEL', COF'Y OF TI-II,.? i E.!~d,i;,~-- ,, (.J ..F., ]: N ,,-1 ! "~ D--' t t ~ .:, 0 Uz F IR ~.~ !,1.. . o, ~ ~r'~:r .... ~ ~Jl,.,/ I .,, ... ~OE/F'B 21,4- I ¢ ~ ,-. .,.' .... ~ ~[.1=/' C i ~-4 ~ SOE/SB iG-4 ~ STATIC 2W-t & ~ 3TATIC 2W-t 5 ~ STATIC ,:L1-t4 ~ ZTATIC 2W-t~,'z ~TATIC ';L-t6 ~. ,?TATIC . '~T L~-l?5;~ ,~ T A T I C i I_-2'~ ,?'FATI C . ,~ Fr--~TI C ';.7 t4 "' ~ ~ ~ T,-., T l F; i G-'i ~ STATIC '~ F-~ ,.~ t ~qTIC iF._ ]7~. ~.Tr-~,Im iE ..... i2~ STATIC i~.~-i i~ STA1- T C.,. i E-'~-,. ~ STAI~C _ ~ E-i' ~ STATIC i Y'-i-S / ;'TATIC i 'f-.$'~ STATIC i Y'"' '~ ~ S f'A T Z C iA .... q.~ STATIC 'FI...-. R H Z T TI.::N T LIFT (:)D I..f.](.; & 'A' SAND F'BLI U ( Ti',I];TZAI.. F'F~:E~'Y,'LJRE) U U U ' 'SAND F'BU I"IFI - ' A ' & ' C' SANDS E:HF' I)ATA I:4HF' I)ATA BI. iF' DATA BI-IF' DATA BI..IF' DATA BFIF' DATA BHF' DATA !r": H F' DATA I?, HF' DATA £-,' i"I P DATA ..'., I- IF DATA BHF' DATA BHF' DATA E:!d F' DATA ! ! o.,. T-.:~ 1F T~ATA r.,u,:, D r-h T,'q ;_,i ii . BI"IF' DA'FA BHF' DATA .BI-IF'DATA E', 1-.I F' DATA ~I-IF' DATA BHP DATA F' F;: r-' ¢',~' U I::: E,: ,.~ .. $' UF;,' V E Y A =: F' ,-~ E .-). CURRIER ., !",~: v RO,'~ : ~: I 5'.TR I [; 1J'r i ON ' DRII_LING W. F'AS'I-IER L ....J O i--I N LC T 0 N E X X O N .HOE',IL F'I-I l [.L .T F'~S' OIL N:,,'!< CI_ERI< d. RATHHr..'LL ARCO Alaska, Inc. Is a Subsidiary of AllanticRIchlieldCompany 4/6-7/E!5 · 3,,'t t ,,'r35 ,. n I "7 6 / o 5 L~/2/l-~ ~,~/D/EIS ~/4/85 7,118185 I in'I!85~. i/24/8S% ~/2/85 ~/2/85 S/i 7,/f i/2t · ! (.~ _/ i/.24 / 85 f/' ~'~'/8~ i /'~ z./F~ i/~t/~ c,~. i / ~," [:~_.. ~; i/t I/o.:,_.~ t/2~-/E~5 t/~>~ '~'~ t RECE VED APR 2 5 Alaska Oil & Gas Cons. Commission D A T E: Anch°ra2~ , S TATE~ F: AI~ U N ~ 0 N I<, T~I_ZN/VAULT ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 24, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Well Completion Reports Dear Mr. Chatterton' Enclosed are Well CompletiOn Reports for the following wells' 2F-6 2G-3 1L-15 1L-16 2H-1 If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU6/L46 Enclosures RECEIVED Alaska Oil & Gas Cons. Col}lrnission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA,. ~.AND GAS CONSERVATION CC /IISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL ~(X GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-183 3. Address 8. APl Number P. 0, Box 100360, Anchorage, AK 99510 50- 029-21204 4. Location of well at surface 9. Unit or Lease Name 387' FNL, 143' FEL, See.31, T11N, R10E, UN Kuparuk River Unit . At Top Producing Interval 10. Well Number 1140' FNL, 1022' FEL, Sec.31, T11N, R10E, UM 1L-15 At Total Depth 11. Field and Pool 1341' FNL, 1285' FEL, Sec.31, TllN, R10E, UM Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Kuparuk River 0i 1 Pool 118' RKBI ADL 25659, ALK 2585 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 10/19/84 10/22/84 11/05/84*I N/A feet MSL 1 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost 6704'MD,6267'TVD 6621 'MD,6210'TVD YES I-~X NO [] 1883 feet MD 1500' (Approx) 22. Type Electric or Other Logs Run DIL/SFL/SP/FDC/GR/CNL, BHCS/GR, Gyro (GCT) 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMQUNTPULLED 16" 62.5# H-40 Surf 102' 24" 214 sx Cold Set II ... 9-5/8" 36.0# J-55 Surf 3475' 12-1/4" 1025 sx AS III & 700 s; Class G 7" 26.0# J-55 Surf 6704' 8-1/2" 275 sx Class G & 250 s: AS I 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 6396' - 6416'"~. 2-7/8" 6333' _608.2' & 6313' 6393' - 6~396'J w/4 spf, 120° phasing 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. 6248' - 6268' L w/12 spf, 120° phasing DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 6235' ' 6248'~ N/A -. 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD II~ Flow Tubing Casing Pressure CALCULATED~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~1~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NONE Form 10-407 -k NOTE: Tubing was run and the well perforated 3/9/85. JMM2/WC32 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. : GEOLOGIC MARKERS .:"" FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Upper Sand 6217' 5911' N/A · ' Base Upper Sand 6271' -5953' Top Lower Sand 6370' 6029' -. Base Lower Sand 6534' 6149' : · 31. LIST OF ATTACHMENTS ~ .. None 32. I hereby cer. tify that the foregoing is true and correct to the best of my knowledge Signed /~~ ~ Title Ass°ci ate Engineer Date 4-' ~)'~' INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. · , Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). I-tern 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate" none". Form 10-407 ,4LASI(A OIL AND GAS GONSE~i~ATION.~,OMHIS$10N · Bill Sheffield, Governor 3001 PORCUPINE DRIVE ANCHORAGE,ALASKA ggs0l,,i.-3J g ~ TELEPHONE(gO'/) 21g~'1433 DATE TO.' RE: Permit No, ~ Tie wish to bring yet received the ~hich our records to your attention that the Commission has following required items on the subject well indicated was completed _ //-z~-~'- Article 536(b) of Title 20, Chapter 25, Alaska Administrative Code, stipulates that this material shall be filed within 30 days after completion of a drilled.well. Please submit the above missing material. '. Chairman lc:C.024 ARCO Alaska, inc. Post office x 100360 .Anchorage, ,.,[aska 99510-0360 Telephone 907 276 1215 F:' L.! l._~' ........ [,.! F:: f) , ~::' ," F'-I... rii,J ...... F' )..'.', !..! :::,r",,, ]' ,S' r'T) C;AS , .T.F--.T,. t '-. L.. ~, F:"i::. ..... ~": F:' l::~ ',q T T', , -' 'r', l;: v ,:-L. 6. i. ;..- F:, ~::' r.:, r.r r: I',,' ,_ ' ........ ,,., A'I"~::' F' 0. ,':-."'T' Fr F;.'. ~'.':-'~ (.':.: ' ~.":'~ ' ::'.," A N ' e ..... ' ,:':-:.' ,':':-', fJ t":., r_..'.F~:L.!.t.)E: F'T.;,~I.'",~ ,r-, ,'-.F~!..:F FRAE) ST ]: HUI... AT l C)N .."F'f:i,:TT' F:'F::,'r"~C ,. · .:.' ; ............. i- ~'" '"l''l' ' ~" '" ,? (', .~, ,2TF..~.~. ~ FF.:,.':~r' ~.~. i'" ~ :. '-r', I .~. ..... .,~'h",...,._TE POST ,r':'r;'AI'-;.,.. . LnG_ ,:.~"T,A'T'i P.. ....... ~-".:HF'/!)HTSI ~I.':.:\.,~EY. F' Ft'. r..- - F' F;.'. A Ct ,,' I::' ,. 7', '1" L! I.::..'!,: :."~ [..~ ¢.~. .,... · ,.~ T,..~T I*C E':HF'/'E~H ]' F' F,' E - F:' I':~ A ,L*;;/' F:'. T. ]*' L! ~) I N G ' A ' S A N I) !::' !:~; A ~, T'., ! I ......... i .. ~ p , c .... D T F:' '*-" 'r ~ ,.'... ::i { *.., ....... ,.) I F:' )::-', LJ F' :' L~ 3..' : F.:,',-.,I I ..,' .r) r'-, ':"'T .... ~' l:? f:.'; '-' , .:_' -...: :- ! :....' ~,2- , :: ;.~ .... ! C-; r::i S F:" ':" ]- :r:- ~" v,':::, L v E-. ..... i ..... F: I:..: i": ? i... ',"~' !~'.'"']'I3;'--~ ,.. ......... :: '-' '-~? .... :. ...: .... } '2. ,.,,: *.., - t.: i '.~ *" -I'1 ... i.: r'~.. .... .'r': .~.: ..... F:,i.~, ..I'; ....... 1... T '"' .:,:.. ......::: :,,... i':,..-.,, ~:;--'.,~ ,1 ..... "'" , .... :':. ., ,. ' :.i"l i : i. i.:..L.,._..-. ARCO Alask,a, Inc. is a Subsidiary of AllanlicRichfieldCompany ARCO Alaska, Inc._ Post Office ' 100360 .Anchorage, ~..aska 99510-0360 Telephone 907 276 1215 ¢,',T'T"-~ ' pr.'~r~R])c' c,~ r:'~:',~ .... !'-.' . :l .... ~ -. . ~.;. i_~ j.~ ..... i~:1\ ,'qTC) ..... '['ii~B .'-:' rl ~:, ,-.-, v t 0 ,':-; 3 ,:t .-.', %: :.//% .,.. .-', ~ I1"~1 I '. , ,I-,-, .:..,q~!':':-."~r.'...F. A" o,-,,..-.~ r.. · -'" .., ,"' ,,- ; ;"~ ..- ~, ...) , ..'.-' ,..' ; ,",!E r.:-r',~ , r',,, · · , ........... , .......... , .~. i".[ C- .~- "-. i'-, !';; E-. 'l" U !:".: N O J'-; r..- "" .11 ~.:,-i-.: ¥'; r'-I'! j::' Y ('i ;'-. ~]]. '0. f' .:. 7' 'i ~ ~; ~ .. .. ,.. ..... ..... · . L J'J '' -,' .... -..- '. "" :~." .,.~ ]-,i::'.. ¢.~ i"-.! .,7 = .., .... ~ ,'- -"-. ~ ~;' ..~Fi... · _:."" ", '~'i '7 ........ C., ~- C., .. ~ · L..' t J. · -"~ ~' .."- ;~'~. ~.,: r', ,'"~ ;.', ~ .... ~:, c'.' ._ (i:: ~':' '~ I~'; '" ¢:J. :_: .*t. ~....: ~,.: ,,; ,,..- ,~... : ..) ; ..-.. r-: b ................. ~ ".~ -, (:) '":17 :-,~' ,_....:.-.r';'.,~.~ ~. ...,..-.--I , .... : ..... i:" "-' -.:;- f'"/:'.i";?F~ C',"' ~ '= "';~-" ....-, ,. ~ ... _.. .,', ..;~ .,- ; ,..:' .--- ,..: ,.; i ii!;" -: ¢ ......, ,'; '.." I:r ~:*, ' · [;' ' ,';, .~ ") ,.-.:, ... o ,:.': :..' i': ~;' A 'T L. ,'-', ........ ,_, ..,- · : I...; ': ..... "" ..:l ~,'" pI.F.'-.'7 ¢-"~'~-', .... 4 ~:: r-,~.-., 'i J::' -. '7 u' '..'..-: ... ! ; ..... ,..,. ....... :. .... · , ... -..- ~.. '"' (L, ... 'i !!:'---- 'i ~-:' ~, r' ~.;'.-.~ ,'..~,-' N ~-"', ~ 'i A ..... ~' ~ ..: ,.... : ,,:...... -.. :..-- . :..,. / i,...~--i !!;u ,-.r" A,"'i;"'¢q .,.... ,.., 03-f ?.... o,--.'..,..,-' / (.:) ...~ "') z'. ,-, ~ 4 ~-,...-..,: ?~, ,.,T.; .: ....,, ,. H L! G H E,:?.,. ' '~ - ,=. ,_: -- c. _, C .,'-':, !'i ,?. 0 ~ -" ;;; ~%? "" i.."~ ~ ..:... ,..: ~ ";.4,"'C'~ fi'~."?',-'-'i c' ..... ....... .- ._. C:' .. _. ................ , ..... . ~"~ .":- ,- ....~ 'z -" ,:: _, · I E--.'7., ¢.,{.,F!A ?~.'.';:'rh 03-.."~.a ..... - .... . . .,c, , "' ,-~, ~> i L.,' ! 6 ~.., ,.; ~-- LI, .-.,A,, F: ,? NF'E P'3--"9' .... o-~ ,... ~ ~. .... :: ... ,~., ....- !' -" :"';,,'L-;TiP- 0¥-'°° ":'"'~ :...;_. ~ ,'., ..' ~ ;..., ,; ~L--.'i ~'c''.. ~..~:'";I':T.P.,",,., ~-.I ,?[ NP~.-. c,X-..~ ~ ,_9~ ~-.~. .._, ,~. -.. -..,.. --- · i L.-~ '-'_; u' ,..-i-~.T,,:: · :./,.., ,., ~.. ,._ ,... ~... ..... 'iU.' "' '.-" ~'"'.~/ ...... t"~ ~ i {:! --- ? '-' ,';', i'i !~. N ;'} ~ --- ..':::; ,3 ..... ,.::, .,'- '-' ~; '"' ri "' ~' I ;''~ ~ ;-', u, ,..,i-.il If-. c.~ ' -' ;- I ~; -.- ~ ?1 L.. -.., ;.- ... .., ....';- ,..., ,! ' ."'; .... 4 F.-- ~ r-- -* ;,,~ r' F't ¢.; 7', -- -~ .~ - C! .-... o .. ,...~-~ :,....... , ....... . ,........ . . '; Ci- i 4 -~ L:'i T .'q ~:", ")---'--' "'" ~'~ '"' · ' . ..... ~.- ~£, ~.'.. I' ~'..:' '; :" i .'2~ ": :':""'- 03 ....~ .Z--; 9!.-'." ' :'"' ,.. i"i - "]., ,_.- L.J . "",, : i ~ - 'i 2 "-" r' -..':-, ;-..~'r" 0 i 4 '") ~ ..,t :: ~..- .. '"'~_~,.~: · i '.-' .- -': '"',---."' ,"'.' '¥' TM :7 fi-, % .... ! r'.. m ~:." '.' ~ .: ..... ..- ...C." .... ,.'::, ..,:' ............ ARCO Alaska, In?. i_s ~_Su?sid_ia_ry.0.f .A_tl~_nl!cRichfieldCompany ARCO AiasKa; inc. Post Offi~-~i x 100360 .Anchor-~ ,taska 99510-0360 Telephone 907 276 1215 /-[ i ~ (i/ de-[ [hill, /"% TF'.,".'-. ~ F,"..,-,,_. F: R,"'d r.:' L. E T E ""r' ~ Ln5 _ _ ,-' d ~; T ~ ~: ¢', "' ST,~:7'ZC BHF'/!::HT SURVEY F'R'E - F' R A C / F'. T. ~ U L::.! f'~ C; ,:, T,(:', T ~ C );~ H F'.-/x{ I"I T.. ,?~_.;',~'-' V E '~' F'RC-F'I'.r~=..,' [- . T, -'L)~:', N~5 ' iq ' S,q N [) F' F;.: A C ' C'.?AND TEST 'F",S'~,~"O_ ,,:_. TEST F' B U ~' ~'-' ~ ~ .... r:' r~ ~ T-.- F ~:',':~ C: ~,~.I .... ~['-, ,..,¢ AS L.]FT './~:'._ , ~:..': -. Z.: Z :~' 'i' ""i ' [..:-;" ',': ~-)i".." · ?'..r., ~' ~ , ,- ,.,,- I,.! .,.,, { ; .!. .: .'_t!'-; .. .... ! ,;-~', ..... ]-- ~., ......... : i'9, -. f.~ F..' :.-" :..-" r;: ~ ..',.-' .... !%! *.~.-'.-'' ~,-.¢ i '4 ..... '' "' "' "' i' ': "'~ r: :[ !..-',i F'i-~ I ;.. L .~...-. j'!"'-' F"! F'r:~,.' .~ ,' ...... ' ..... '", , :,,: .~., ~ .., ...... , :';. ,. ,. ''~i"l ! i -..,L.."--. ARCO Al~k,~. Inc. is a Subsidiary of AllanlicRichlieldOompany ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 March 27, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation 3001 Porcupine Drive Anchorage, AK 99501 Commission Dear Mr. Chatterton: Attached are our notices of intention to reperforate Kuparuk field well 1E-3 and fracture the following wells: 1E-3, 1L-15 and 1L-16 If you have any questions, please call me at 263-4253. Mike L. Laue Kuparuk Operations Coordinator MLL/kmc Attachment (In Triplicate) RECEIVED MAR ]985 Alaska 011 & Gas Cons. Commission Anchorage ARCO Alaska, Inc. Is a Subsidiary ol AtlanticRichfieldCompany STATE OF ALASKA ALASKA U~L AND GAS CONSERVATION CO,v~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator ARCO ALASKA, INC. 3. Address P. O. BOX 100360, ANCHORAGE, ALASKA 99510 4. Location of Well SURFACE LOCATION' 387' FNL, 143' FEL, SEC. 31, T11N, RIOE, UM 5. Elevation in feet (indicate KB, DF, etc.) 118' (RKB) 12. 7. Permit No. 84-183 8. APl Number 50- 029-21204 9. Unit or Lease Name KUPARUK RIVER 10. Well Number 1L-15 11. Field and Pool KUPARIJK RIVER 6. Lease Designation and Serial No. KU PARU K R I V E R ADL 25659, ALK 2585 , P001 Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate ]~ Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) UNIT FIELD OIL (Submit in Duplicate) [] Altering Casing [] [] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). It is proposed that the "A" sand in Kuparuk well 1L-15 be hydraulically fractured and propped to improve production. The treatment uses gelled water as the pad and carrying fluid and 20/40sand as the proppant. Gelled diesel will be used as a flush. Lines and equipment will be pressure tested to 5000 psi prior to starting job. Pre-post frac logs are included in the treatment program. Fluid' Gelled water 331 BBLS Gelled diesel 19 BBLS Proppant' 20/40 sand 12,474 LBS ANTICIPATED START DATE' APRIL 2, 1985 RECEIVED MAR 2 7 1985 Alaska 011 & Gas Cons, Commission Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. C~O_x~-~ KUPARUK Signed N~-J2~ _ . j Title OPERATIONS The space below for Commission use 3/27/85 COORDINATOR Date Conditions of Approval, if any: Approved by COMMISSIONER z~pproved Co~¥ Returne~ By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510 Teiephone 907 276 1215 January 22, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 1L-15 Dear Mr. Chatterton: Enclosed are the Well Completion Report and gyroscopic survey for the subject well. If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU3/L63 Enclosures Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc, is a Subsidiary of AtlantfcRichfieldCompany STATE OF ALASKA " ALASKA L._ AND GAS CONSERVATION CO AISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [~)( ABANDONED [] SERVICE [] ... 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-183 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21204 4. Location of well at surface 9. Unit or Lease Name 387' FNL, 143' FEL, Sec.31, TllN, R10E, UN [l-~-"v'"::~'";"-;'i Kuparuk River' Unit At Top Producing Interval i~ 10. Well Number 1140' FNL, 1022' FEL, Sec.?,1, T11N, R10E, UM ~.~.. ~ 1L-15 At Total Depth I ~. hl. t--~' ' ! 11. Field and Pool 1341' FNL, 1285' FEL, Sec.31, T11N, R10E, UM Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Kuparuk River Oil Pool 118' RKB ADL 25659, ALK 2585 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 10/19/84 10/22/84 11/05/84I N/A feet MSL N/A 17. Total Depth (MD+TVD) 18.PIugBackDepth(MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 6704'MD,6267'TVD 6621 'HD,6210'TVD YES ~ NO []I N/A feet MD 1500' (Approx) ~2. Type Electric or Other Logs Run DI L/SFL/SP/FDC/GR/CNL, BHCS/GR, Gyro (GCT) 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# H-40 Surf 102' 24" 214 sx Cold Se1; II 9-5/8" 36.0# J-55 Surf 3475' 12-1/4" 1025 sx AS Ill & 700 sk Class 7" 26.0# J-55 Surf 6704' 8-1/2" 275 sx Class G & 250 s~ AS I ,. 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None N/A 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD II~ Flow Tubing Casing Pressure CALCULATED.~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 GRU3/WC37 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. · GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Upper Sand 6217' 5911' N/A Base Upper Sand 6271' 5953' Top Lower Sand 6370' 6029' Base Lower Sand 6534' 6149' 31. LIST OF ATTACHMENTS W~ll Hi.~tnrv. Cvr~sennir. S~rvm. v {9 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed dz~(~/~g~j¥,../~.~~.)t--~' Title Associate Engineer Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 AtlanticRichfieldCompany '~' Daily Well History-Initial Report Instructions: Prepare and submit the "Initial ReI~IT' on the first Wednesday after a well is spudded or workover operations are starled. Daily work prior tO Spudding should be summarized on the form giving inclusive dates only. North Slope Borough IState Alaska Well no. iL-15 DistrictAlaska County or Parish Field Lease or Unit Kuparuk River ADL 25659 Auth. or W.O. no. JT t e AFE 204188 I Drill Parker 141 API 50-029-21204 Operator A.R.Co's W.I. ARCO Alaska, Inc. SpuddedorW.O. begun lDate IHour ProrstatusifaW.O. Spudded 10/19/84 0230 hrs 56.24% Date and depth Complete record for each day reported as of 8:00 a.m. 10/19/84 16" PU BHA Wt. 10.1, PV 10, YP 5, PH 9.5, WL 8.3, Sol 12 Prep for skid. NU div lns& vlvs. NU 20" riser, fill up in & FL. Mix spud mud, PU BHA. Accepted Ri~ @ 0230 hrs 10/19/84. 10/20/84 9-5/8" thru Wt. 9.1, PV 10, YP 10, PH 10.5, WL 11.4, Sol 4 10/22/84 Spud well @ 0815 hrs, 10/19/84. Drl 12¼" hole to 3490' CBU, slug pipe, POOH. RU & rn 86 jts, 9-5/8", 36#, J-55 BTC csg to 3475'. M&P 1025 sx AS III + 1/2#/sx D-29 & 700 sx C1 "G" w/2% S-1 & .2% D-46, followed by 252 bbls mud. Lost compl rets f/last 205 bbls of displ'ment. Bump plug to 1500 psi. ND diverter. RIH dn 16" x 9-5/8" ann w/l" to 140' RKB. Circ contaminated mud cln w/70 bbls wtr. M&P 150 sx AS I. Good cmt ret's to surf. NU &tst BOPE. PU BHA, RIH to 3388', tst csg to 1500 psi f/15 min. Drl flt equip + lO' new hole to 3500' Tst formation to 12.5 ppg EMW. Displ spud mud w/polymer mud, drl to 3600', POH. PU DD, RIH, DD to 4224', POH. PU rotary assy, RIH, drl to 5347' 3735', 6.7°, S33W, 3735 TVD, ll VS, 8S, 7W 4082', 20°, S49.5W, 4072 TVD, 90 VS, 67S, 61W 4431' 27 7° S47.5W, 4390 TVD 233 VS, 162S 168W 4989', 28.9°, S49W, 4881 TVD, 498 VS, 339S, 366W 5299', 30.8°, S51W, 5150 TVD, 652 VS, 438S, 484W 10/23/84 9-5/8" @ 3475' Wt. 10.1+, PV 12, YP 10, PH 9.5, WL 6.6, Sol 11 Drl to 6704', CBU, POOH to csg shoe. RIH to TD, POH to log. RU Schl, RIH w/DIL/SFL/SP/FDC/CNL/GR to 6702', att to log, PU mud ball, POH w/tl. Cln'd tl, RIH to log. Start logging. 5613', 33.6°, S52W, 5415 TVD, 819 VS, 542S, 615W 6201', 37.5°, S55W, 5894 TVD, 1160 VS, 743S, 890W 6638', 47.5°, S54-1/2W, 6217 TVD, 1453 VS, 914S, 1129W 10/24/84 7" @ 6704'' Wt. 10.1+, PV 14, YP 8, PH 9.0, WL 7.0, Sol 11 Rn DIL/SFL/GR f/6696-3477 FDC/CNL/CAL f/6696-6000. Rn BHCS/GR F~ [ ~['~ ) f/6684'-6000', RD Schl. RIH to 6531',w/20 rm 6531'-6704', stds & LD circLD BHA. Chg rams to 7". RU & rn 168 jts, 7", 26#, J-55 BTC csg to 6704' w/FC @ 6621'. Circ f/cmt job, tst lns to 3500 psi. ~.J '"'*-" ?~'i 19 ~-;~ ~',0~: .. Drop btm plug pmp 45 bbls Spacer 3000. Loaded top plug, M&P 275 sx Cl "G" w/3% KC1 (BWOW), .8% D-60 & .2% D-46 @ 15.8 ppg. .~.~ ~spl w/10 bbls wtr, followed by 243 bbls of brine @ 10.1 ppg. - ' Bump plug to 3000 psi. Bled off press, flts held. Anchoraqe The above is correct Date sFe°; 'l~rrgePdruefeasra~ia°nnuaa~, % e(~ct I roinb Ult '0?n' 10 / 2 9 / 8 4 Drilling, Pages 86 and 87. Drilling Superintendent AR3B-459-1-B Number all daily well history forms consecutively as they are prepared for each wel. iPage no. ARCO Oil and Gas Company '~, Daily Well History-Final Report Instructions: Prepare and submit the "Flnat~RePort" on the-first Wednesday alter allowable has been assigned or well is Plugged. Abandoned. or Sold, "Final Report" should be submitted als~-~whe~.operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report compl~3rl and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. ; District County or Parish Alaska !Lease Field or Unit Kuparuk River Auth~ or W.O. no. T t e AFE 204188 Parker 191 I Accounting State cost center code Alaska North Slope Borough ADL 25659 Drill API 50-029-21204 we,, nOl. L_ 15 Operator AR.Co. W.l. ARCO Alaska, Inc. 56.24% Spudded or W.O. begun Date Spudded 10/19/84 Date and depth Complete record for each day reported as of 8:00 a.m. Iotal number of wells (active or inactive) on this Dst center prior to plugging and ~ bandonment of this well I our 0230 hfs Prior status if a w.o. 10/25/84 .7" @ 6704' 6621' PBTD, RR 10.1 Brine ADC: $630,031 ND BOP, set slips on 7", cut 7". tbg spool. Tst to 3000 psi; OK. 0800 hfs, 10/24/84. FS @ 6704' - FC @ 6621' NU 11", 3000# x 7/16", 5000# Blow csg dry to 120'. RR @ Inj 250 bbl wtr @ 7 BPM @ 800 psi. M&P 250 sx AS cmt@ 5 BPM @ 800 psi. Follow w/54 bbl Arctic Pak @ 7 BPM/200 psi. ~laska Oij .~. UU.S (.;Orh..¢, C0~inissioR Released rig Date Kind of rig 0800 hrs 10/24/84 Rotary Classifications (oil, gas, etc.) Type completion (single, dual. etc ) Oil Single Producing method Official reservoir name(s) Flowing Kuparuk Sands Potential test data Well no. Date Reservoir Producing Interval Oil or gasTest time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected , 10/29/84 Drilling Superintendent For form preparation aCd distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. AR3B-459-3-C Number all daily well history forms consecutively as they are prepared for each well, i Page no. O Division of AtlantlcRIchfleldCompany $ UB.$ URFA CE DIRECTIONAL SURVEY F~UIDANCE F~ONTINUOUS Company Well Name DRILLING ANCHORAGE FILE COPY A~O ALASKA, iNC. N~sY,~ 0i~ E Gas ~o~s, ATLANTIC RICHFIELD COMPANY i i m i i i ~ i 1L-15 (387' FNL,, 143' FEL, S31, T11N, RlpE,UM) Field/Location KUPAR_UK~ NORTH SLOPE, ALASKA. __ . . Job' Reference No. 69850 Lp~{]ed By: MCBRIDE Date DEC-11-84 Computed By: STEVENS ! SCHLUMBEROER ARCO ALASKA, INC, IL-IS KUPRRUK NORTH SLOPE, RLRSKR NOVEMBER S, 1984 TVW PLOT FROM OCT DATA JOB REFERENCE G98S0 NELL: 1L-15 SURFACE LOCATIO -387' FNL, 143' FEL, S31, T11N, ~IOE, UM VERTICAL PROJECTION -~SO0 -2000 -I,~10 -I000 -SO0 0 0 ~00 1000 1,~00 SN 'f...' f ~'.~-i'~ t..+":'"h'f'~-! .... ~,~ ~ ~ ~ .... ~ ...... i..-- ....... -;.- ., .- i .-. ~-- ~ ...; .~. .. .r ~-..~.-4....4...~..-. ............ ~.--,.--, -:.4 ...... ~ .-; ........ ' ' ~ ~ ' .... ' ~ ~ : : ~ ~ ~ '"'-~'"':'-~'"'~'"~'"~' .......... J .'"~"~ .... ;'"~'"i T '~'' ~-.~..,k-~.. : ~ t ~ ~ ~ ~ : ~ : : : : : : : - : . : : . : . . : : . . : , : . . . ..... :'~-~:~ ~?-'""? '-":"'-:.::.:L~:::~:.i::¢::~]. :'--!-:::.:~::.i...i:-~ !, ::::::::::::::::::::::::::::::::::::::::::::::::::::::::: . . PROJECTION ON VERTICAL PLANE OF AZIMUTH 250 ~AL£O IN VERTICAL 0Ef:TH$ HORIZ SCALE : l/S00 IN/FT -WELL: 1L-15 ' SURFACE LOCATIO -387' FNL, 143' FEL, S31, TllN, .,lOE, UM HORIZONTAL PROJECTION NI31~TH 5110 ~F 5~0 SCALE = ! / 500 I N/FT - l~~F~ ~"T~ ~ ~]. ~ -?] ~ ~ ~ ~ ~ ~ ~ :u??+-~?"r?i"=:'"t"? ......... ~---'"~ ..... ?-.~......-~..+..?~...'-~.~;...: ...... + ....... ~.-~ ....... I-I~ ~ i [~ ~ i i ~ ~ i F~ : : ~' "'T-~ ~ ~ ~ i ~ ~?~T'?:"'T"'T" '"T"T"r'T"?r'-T'"T'"i ...... T"; ..... T"t ..... ~ ....... ~ ..... ~ ....... ;-';'"f .................. ?'-~ ...... t .............. ~,~'~~~~'-??~'~-=~m--~--?=~]--~ ....... :=-?;-"?k-~-~..-~--?--:-..~.F--.--m..-~-.;..,~--.~.[~..=~ ..... ~ .......... ?-,~.- I-~"i i ~ [ I ~ -T"~ "~7 1 ~ t : ~'F? ..... r'~'T"~'~T-'l'"T-'?z t .... T'"r ......... r". "r"t"'t"~"'T""-'~'+'--"-. .............. ~ ................... +---: .......... ~ ~ ~ f ~ i ~ ~'~-~"~ "?"f'?'?-t-~'r-~-~??~-'??f-~t-'f'~t-~-.:..-f.: ...... ~-.:.--~ ..... ~-..,---:.-.~ ....... :..-;...;--;4 ....... ,.-.~.---..:.--:-~k-~ ......... ~...:-.:-.;..:... [~"i"i i ~ ~ ~ 1~ i~~' '+"~??'tff'"i-~f"[~m'?f"t"'f"f"f"i"~'?e'~T' ,'+-":"'~'"?'f"~ ........ :'": ...... ~'"'~'":'-'~ ............... ~'--~-..----:-'-¥--"-~-¥':-'.; ..... ;..;.--~-.~ ...... ~ ~'~-~' ~m~~ ..... ?f"'~'-~-f'-r"~"+"T"h f~-~ ...... r"f-:'"t'"'"'f"'?~-f ............. :"'t ............. ~'-;'-'~-'---'-¥-;.--t ....... ~.-~---;...~.-:-..:.--~ ...... ~ ...... : .......... ~..-: ...... : ...... o rT'?~ti :~: :~?'m'-?' ?'t-~ ..... t"?'?"='"'~'~"?'~"'t ....... t"?"t":'?'~'~ ?:~;t:::z! :"?:':": '2~" ~...~.-~-.~¥...~..-.~4,.~...~-¥.;...~.F.~..~.~..~.; .... ~.~ .... ~-.i...~...;.4-~.~..¥.L.4.4..¥ :.-+..?.;.-.z...: .... ;..-~.:--.: ....... :..l .... '....: ..... ; .............. ~..k: ...... L.L.4 .......... : ~m~m :....: ............. ..... ..... ....... .... ...... ?. ....... ....... ..... =============================== ================================================= :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ..L~..~..~, .... : ..... ~.:.~.~ .~:; .... ~.:..L.ii~:: .:L.',~: ~:- ~: ' ~Z ~ ~: ~~ ::::::::::::::::::::::::::: :-~::~::~.:~:::L~...~...¥ .....:._.¥ ~. ~..: ..... ; ~:-..~..~ ...... ~.. ~..~ .~.-; :...~ ~ ..... :...~ ..,...~.=;. ~: ================================== :::~'. ::::::: ..x ..::: u...x.. ;-. ::..~ ~?~...¥.,+~...~...=~.+.,..~_=¥.~_~?¥.%...~...=~...:,._.~ ............... ~.T¥.;..¥.¥.?~ ........... ~ .... ~...~...~+~....:...~ ..... ~.~.+..~ ..... ~..~...~ .... ;..j..~..:...~..:..: .... ~..~ .............. ~...~ ........ -~00 ~Y'~-r~'t"?-?'Pr''~ ~' ~'f'f"f'~'"~ ' ' ~ i ~ ' ' ~ ~: :''~'; ' ' .... ~ ............. :"; '"' .... ' ' ~.~-~+.~.-~-~. x.44...~...~-~-.~..i.-~.~.~-,4...~..:-4..- ~...~.-,..4. ;.-~ 4...4...~ ?...~ ...... L. ~...~...~_[ ~..2.~. ~'~j::.:'.'~':~.:. ~'~::' ::~ ~ ~:.]: :.:'l ~.~...¥.L.~...~..~..~...~...u,_¥.~.4. ~...~..~..L-.~ ~..- L. ~..; ....... ~-. ~-~--.-;-.: 4. ;--:..:- ;.4 :. .......... ..4...:.4..~.. L..:..~ ..... ,.~...~. ~~.T": ':::':...:..., t.~. ~..~ .: .... [ .......... -"~"T"'~'"T'T"T-T'"T'"T"T'r"~"~O"?-~-~"~"t:~].~. ~ :'~'"t~ ' ?'~?" T ~"~ ......... T'"~ ..... T"T"T : ~'"~'~";'"~ ..... ~'~'"~-~'"~ ......... ~ "!-'~ ?-"+'~ ........... - ~ ooo ~-"~ ~-~ 't' ?"f+"~"f? -::~ ~"~ '+ 'f ':'"f": 4..-~--t..=D ~?-~...f:++-~.--f.f..:- ~ ;..~4.-.f-.f..~...:..--: ...... t":"":"':"-:'"f"~'"f";'" ~ l"~"f'? ;'~ F':' .H-.~ ~-~ .:+:.-i.-:.-~-.+ +'i · N...L.~-~...~..-~.~ ...... !...:.--.:...+.:.4..~-.z.~...e.~ ................... ~ ...... ~..~ .~...~ ....... ~..~...~...~..:.........~...:..L.~ ..... :...:...~ .~ ...... '. ....... , ....... :...:..:...;...'_.L.L.:,..;_L:_L:_:..L..2LZ..] ....... : ........ :;~..:...~ .... ~ ~ : ~ , ~ ~ · i : ~ ' : ~ ~ ~t : ~. ~ ~ ?"~' '?"~"~'-~ ...... Z'T"~'?"?-T'~ .......... ~": ....... r'?"~ ........ ~--.? ~-.m?--~ ?.-t-?-?---~.? .... ~- .--~?-. ,? ................................ ?"?tT't?:":"T'~ ...... ~ ~-~t::t'i'"~.'"~''~ ....... ~ ....... t': ~'1'":"~"?':"~ ....... t ......... ~'-?'?-'r ...... f"~",' Cmf"t'T"f '~t'''~''f'f-:''~''';-'~'' r+~-~..-~ +..:-.~ ..... ~.':~:":~ ...;_~...~...L.4..~_L.~...:..,~...~...L,,.L..~..,L.~..L~...~ ........ : ....... L-L..~ .... L ~ L.: L~-L ~:. ~ _~ : : ~- : - ~ : -. ~ i' : ~ ~ : ~ ~ :, i ~ - ~' ~. ~ I...;...~..LL.b~.-:...~...~...~:. ........ ~..L.;-;...L.~4...L:...~..~.-.~...L.~...:...:_L:...~...~.+.L: ...... ~ ....... L.~...:..?.:..~..~...~ L.;...L..LL.; ....... L.L.~...~...u.~..:...~...:_4...L..LL4...;...I..c.: ....... :..~ .......... : ...... ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: =============================================================================== ~-~.,.-~-~..~.~...-..=.~-.:. ....... ~...~...~...~...:...~ ....... ~ .......... :...;...Lc..,._~..:...~ ..... :...~ ........ c..:...:. .......... t...~..: .......... ~ ............... f..L.:...~ ..... L:_~_~...L' 4..;...Li..L.~.:...:..& : ; ~ : i , '- : : ' : ' i ' J '- -' · ' ' ' "i ----i:~ ..... ~ i · :._:T: :;~ :- _ .' : .- ..~: i, . ,.~.,. "+"t't'~-i"t-T'?'"r'"T'?"t'-: ........ m--¥'?'f"~ .......... :--: ':'":'"r'+"'"'r'='r"-'--:'": ....... :'"-'"r ...... :'"'.-'m ............ ~ .......... ~ .... :-.: ........ -..~ .......... - ..... '..J ............ ~, ~..;'~. ~: :Z']Z'Z:FZ']iZZ~:'":'":'"t'":'''''~ ...... F': .......... :"'T ......... ?'":'"~'":'":'"~ '"'ff'"~ ............ :"F:'"':'":'"m-"~ .............. ~ ...... :"-') ....... ~ ....... : ........ ~"~-:"';'-~-'~'"~ ..... : ........... . -~ooo k:...~ ..... :-~-, ~..~.-~...f.-: :"'¥:.:L;~-.:';.~"::?~ .:'::;.;.:;:;--.: :-.L:Z~:.N.--::':L.~;:::-"'~.:;'L]..:I:'.;L:Z: ;~'.%-./.;.~:'L.:.- ..... ,....L...~-.l..-..:....:-..:..~....~..: ...... ;....L...~....L..~..? ....... J, ..... ~.. = ~ i ~ i = ~ . · = i .; . ......... i ........ : ....... : ' ' ! I ' ' ~: i ~.! I~ : : =I ; ' -: ~ ' ' ' ~ I : - . : - . : , : ~ .... : . : . t.'? :'~ ....... T'"; ....... ~'". ....... .":","' T ....... ~ "..' ~' '; ............... : .... .'.'";'; ....... : : i , . - .. T ;."-'"t"C'"T'"~"'T'"T ....... C ........... ,' .................... ~ .................. .'"'t'"~ .............. T ....... :'"'; ...... ...'"":'"r"T ........ T ................... ? .................. ; ................... ~ .................... i ~-- --~ .-....TZ T...~ ....... i .......... ,i......'~ ~..~ .......... :....',. i..'. ...... I..' ....... ~%T~7-'.;..-.; ~. ;Z.-.~T..Zi ZE~Z_i-.-T...'.'.T' :../.~.T' '." 1'7-.. '-T- ' ~ - ~ . : - ~ ~ . : i . . , ............... ~"'? ...................... ~'"? ....... ' ........... ' ....... ~'"- ................................................................ i ............................................................... .t ....................................... .-~ ............... :...~ ............. l ....... : .... ~....~ ......... ~...~...! ................... : ................... ~...~ ....... +...¥..; .................. + .................. : .................... ~ .................. : ............ ~..~ ............... ~ ........... :.] "r'"~'";'"~".'.."~'-F-": ...... ~ .... --.: --;---.!--.. ..... : -,t ; .... :"T'?':"F¥'~' t- :T"~ ~'"i'"~'"~ ........ :"'t .......... '"." F'''~ ....... ;'-' · .... . - · ~ ..... ] · . '. .... I '__ I ~ : : : :.. .i . i" i ~i J'-~"'?'~'"f"'f'"~'"'l t ..... '~ ........................................... :": ......... : ....... ? ....................................... ":"~:.r'~ ~., '~- '! "J"' :'"" :'"TF':':'";~'?i ....... i"i': ...... :' ~'' ;'.'7 ...... ::'-'~ ......... ~ .... ,'-':-: : : : · I : ' - : ~ · ' - : · ~ I ~ : : : ! ! ! .i ' . . . .' "~ ...... r""; ............... ................. ~ ................................................ , ................. ~ .................. ? ......... ~ ...... ~ ....... ?...~ ....... ~ .............................................................. ~ ........................ 1 ................. :"'~, ......... :" ' ' r'" ....... ?'"~ ....... ?"-~-"y'-? ....... 'J" ':'"'~ .................................................. ~ ................... I' ............................................................. " ................. ; ....... ~ ....... ~.4 ................. + .................. ; ....... -;...:. ........................ + ..Z .............. J,. ? .L..+ ....... + ............................................. ~ , ~ . ~ , : ! ' -. l~ ' '' ' ..~:'i-' .... i ' -4 ................. t ................... + ...... ~'--: ....... !---~ ....... ~-.+. ].-:----i ........... ~ ................. -" ~ .............. L---.--: ................................................................ I ....... - ......... -3500 -3000 -2500 -2000 - 1500 - 1000 -BO0 0 SOO WEST EAST .SCHLUMB~.R&ER SLT 9iR,.-CTiGNAL SURVEY .. .,, C'J S T',3~£ R LISTING F 3R ZL-i :5 .NE.;.qT,d SLJPE~ ALASK.A SURV~_Y DATE: AL.[MUTH AZZMUTH gE S3UTH ~9 M~N ~,:ST C3MPOTATiON IL-15 KoPARoK DEPTri 0.00 ZOO.Od 500.00 700.00 8OO.OO IO0$.OO liOO.O0 /~O2.gO 31OO.. 320S. 3~00. 370~. 3~0~. 3~00. JO O0 .~C GC O0 JO TKUc V d R T l C A ,~ DSPTH INT=RPSLAT,~,3 VA,LU~ES FOR '~:ERTiCAL DEVZATION AZIMUTH DEPTH D:EG M.IN - i i ~ ,. 0 ~ ": ', ~. "'0 -i 3.JO 0 0 1113 0 1'5 ,0 1,4 O 14 ,0 20 0 2,~, O 2.5 g'=-G 0 O 0 0 1£ C 15 0 0 i= 4 3 42. £ 17 Z~ 24 ZZ 2O 23 15 £,~ 0 34 N 77 25 S 54 S 72 N ~3 N 3'7 N 10 i3 VERT.t S~CT 0 -0 -0 -j 0 i .i. . ~.~ ~m i. 5. l $-,3 EC-84 PAGE i DA'YE OF SURVEY: 5-DEC-84 KELLY BUSHING ELEVATION:, 1.18.00 ENGINEER: iOO FEET OF MEASURED DEPTH MCBRIDE, CAL DOGLEG RECTANGULAR COORDINATES HO;" ION ,SEVERITY NORTH/SBU'TH EASY/:WEST DIS ET 3EG/IO0 FEET FEET' FEE .00 0.00 0.00 N 0.00 f .,Oi 0.43 0.00 N 0.02 W, ! .08 0.08 0.30 N 0.14 W' .0' .31 0.14 0.71 N O.,ZO W 0. .40 O..IZ 1.10 N 0.40 · C5 0.0'9 1.30 N 0.76 ~ I .S7 0.18 1.54 N 1.20 W .2, 0.0,5 1.78 N 1.82 W 2. · 59 0.13 1.94 N 2.54 W 3.19 .il 0.11 2.08 N 3.2.'1 W ,3.&3 0.0~ 2.20 N 3.71 W 4.31 0.06 2.31 N 4-15 W 4.75 0.0~ 2-38 N 4.62 W 5.19 0.13 2.33 N 5.i4 ~ .5.~4 0,.15 2.09 N 5.63 W 6.01 0.46 1.82. N 6.04 W 6.31 0.421 2-07 N 6-3% W 6.67 0.18 2.58 N 6.10 W 6.62 0.23 3.13 N 5.57 W 6.39 0-18 4.04 N 5.~1 W 6.59 0.09 5.17 N 5.22 0.09 6.3,6 N 5.34 0.07 7.7? N 5.31 0.09 9.25 N 5.19 0.13 10.36 N 5.24 0.15 10.84 N 5.21 0.05 10.88 N 5.09 0.2'7 10.80 N 0.05 10.53 N 5.86 0 .,2.% .... ", ..i,O,, 2.~,,. N .... ,,, 6..53 ':'0 ~ LI.'~'" :'"' "'~" ""' ~'' ........ ':" ?. ' , ."10"20 :::( i- ':" ''~.'::-' ;:::':: 'i.,,:,'" N "":" "'"'7 ' ~.. 1""" 0.10 7.82 0.03 8.45 0.11 9.08 0.11 9.67 0.2.7 10.1~, · .: .. ,: .',%,. : ' ,,4-.:~:~.:~_ 17. i 7 10.14 N 9.97 N 9.73 N 9.43 N 9.02 N 8.71 N 5.89 N 3.56 S 18.75 S W 7.35 W 8.31 W 9.%1 W 10.61 w 11.61 W 12.03 W iZ.O2 W 12.01 W 12.05 iZ.i6 W '::" 12.4 '9 W 12.80 W 13.07 W 13.31 W 13.50 W 13.57 W 13.55 W 12.95 W 17.54 W 33.17 ~9 ~5 50 3S Ol ~3 52 o2 O8 57 O3 30 31 O0 EPARTUR. E MOTH MIN 4 W 18' W 20 10 W ;0 27 W 36 W N 52 4.0 N 57 0 W N 59 19 W N 60 52 W N 62 4Z W N 65 34 W N 69 35 W N 73 14 W N 71 5,3 W N 67 1W N 60 *0 W N 52 15 w N 35 14 W N 37 38 W N 40 17 W N 43 1 W N 4.5 4,1 W N 4~ ZO W N 50 N 62 58 W S 78 16 W S 55 35 W C OMPU [AT RU, PARUN NORTH $~.CPE, G~PT~ 510 560 570 O.O0 0.60 ~0o5.5~ 5323.i,= 5407.O3 iNTERPOLATED V~LUES FOR 3U '-S~-& ,. C,]URSC V!~'T~CAL DEViATiON AZIMUTH ,gLPTq D~G ~IN D,SG MZN . . 337o. ~L "16,,!.,2 'S '+3 Il ~ S 46 25 W S ~6 2.5 ~ ~ ~6 50 ~ S ~ 7 1 :a w S .47 23 ~ S ~7 4 l W EVEN t00 PE~T VE.RT£CAL DEGL. S.E~TIONu SEVE 5 'l. 2,4 ~. 8=. Oe 3. 124.57 3. 165. ,33 1. 210.;"3. ,'56.63 303.91 O. 851 o O. 3 '~ ,~. '~ Z 0 .. ~6.80 0. OATE Q,F SURVEY: .5-0EC-84 KEL,L¥' BUSHI, N~ ELEVATION: ENGINEER: :MC:BRIDE OF NEASORED OEP'TH oOgO.OC oi¢O.OC 6~00.00 o~O3.OO 6~CG.JO baOO.,SO 6700.GG 0704.06 1929.8'9 !387.38 1140.51 1273. PAGE '~ ~ .. RECTANGULAR G ITY NORTH/SOUTH EAST/~EST COORDINATES O0 FEET FEET' 14 37.29 S '~3.43 61 59.'05 S 65.40 28 84.08 S 92.03 88, 112.68 S 111.90 35 1.43.~3 S 154.0~ 38 17'5.34 S 187.83 12 207.66 S 222.~ 04 239.83 S 2~7.20 13 2'72.18 $ 292.29 32 304.56 S 327.60 0.~0 336.8'~ S 363.52 W 0.55 369.00 S ~O0.OO W 1.7.0 401.16 S 437,.2~ W 0.2.5 434.1~ S 4'75.67 W 1.0'7 4,57.13 S 5L4.38 W 1.73 500.57 S 55~,.3~ W 0.79 535.08 S 596.57 W 1.10 570.15 S 6%0.45 W 1.O1 605.92 S 685..67 W 0.13 641.02 S 731.3l W S 717.13 W S 823.02. W S 870.35 W S 920.00 w S 972..10 W S 1026.1 1 W S 1082.29 W S 11~0.02 W S 1142..33 W ',: .,. ,:...":, ,='[-','~: ,,.. ;.;:: -, , 0.22. 675.99 1.36 710.76 2.10 746.36 2..69 783.63 2.10 813.44 2.83 864.90 5.15 907.83, 0.00 951.85 HO FEE 8B ~ 124. 166. 210. 256. 30~- 35I' 3 9 9.3 9 44~T.30 118.00 FY ~RTL~RE MOTH i:G MIN ;9 Z O W ~:7 55 W :,:~,735 W '47' 14 W ,,:;'i~658 W ,6 51 1 6 59 W S 47 2 $ ~'1 5 W 4g'5.,61 S 47 10 W 544.20 S 47 18 W 593.39 S 47 27 W 644.01 S ~7 36 W 6~.8% S 41 45 W 746.91 S 47 55 W 801.38 S %8 6 W 857.55 S 48 19 W 915.03 S ~8 3Z W 972.49 S 48 45 W 1030.00 S 48 58 W 1166.~5 S 4~ 23 W 1208.51 S ~ 5~ W 127~.98 S 4~ ~ W 1342.00 S 4'~ 52 W 16~2.63 S 50 0 W 14S5.15 S 50 8 W 1~8B.05 S 50 8 W '. , Tkb O.SO 0 2000.00 5000.00 6000.00 5?.34 670~.00 ~' NC . AL.~:SXA C:']P, PUTA'TZON OATS: .lO-DEC-84 ii'4TdRPOLATED VALUES FOR 'EVEN iOD0 FEET OF ~ER'TiCA~ ,DEVi.~!iI~N AZ,IMUTm DOG M.IN N O 0 E N 78 4T W N 7 7 W S 84 13 ~ S 43 tI'W S 48 1'~ W S 5,2 42 W S 5Z 41 W VERTICAL SEC'TI3N FEET 0 . ,o 6 -'1.08 1 D £ '~. 39 1455.03 DATE OF ~URVEY; 5-0EC-8~ KELLY 9USHING ELEVATION: ENGIN~ER:~ MCBRIDE MEASURED DEPT DOGLEG SEVERITY.NORTH/rS,DUTH DEG/IO0 : FEET 'RECTANGULAR COORDINATES' E,ASTJWEST, OI,~ FEET": FE~ 0.00 0.00 N 0.00 E O. 0.04 : 2.20 N 3.71 0.09 5.17 N 5.22 0.11 10.20 N 7.21 W ,11 4.1,~ 37'29 S 13.13':W , 0.40 3.36.87 S 363.5~ 0.22 675.99 S 177'15 103,0. 0.00 953.61 5 11~Z.33 PAGe: :3 - 118.00 ARTURE :MU'TH MiN 0 E 19 W W CJMPUTAT~'DN~. SAT"'' ~RCO AL.&SKA, 1L-i 5 (UPARuK £ NC. .-iL .4:~ "NT2RPOL~TED VA~.Uc$ FOR EVE :ASUR,CD V' i8 1i6.00 7 l~ . O0 ~ i 8.0 S S U .~ -S E .A V ,c R 'T i C ,'~ L ,3 ,E ,? T 4 111 ..t.02 . l~io. U3 2~18.Uc 2 ~i ~. O 7 201~.07 27i0.07 2918.08 3018.08 3118.98 32id.d9 331~.3~ 3~,18.39 35!A.09 3oi~.G9 3118..>2 ,: I,,.o, UO 2 2. i ~,. 0 ,J ~4~ ,~Sl~ 3018..00 3~13.0J 33i8 .So 3318 aai& .CO 37!g.00 2803.$0 2SC"' 3~00.0~ 33CO.J~ 5.5 C 0 . S C 3700.3C O C 0 21 0 21 0 23 0 13 4 52 9 1~ i0-3EC-84 DATE OF SURVEY: 5-DEC-Se KELLY BUSH, IN& ELEVATION: ENGI,N, EER: MCBRIDE N iOO ~EET OF SU~-,SEA DEPTM iC~L TION DOGLEG RECTANGULAR COORDINATiS HDR SEVERITY NORTH/SOUTH EAST/WEST OIST;a D~,3/100 FEET FE~T ' FEE O.O0 0.00 0.00 N 0.00 O.O0 0.25 0.00 N 0.00 O.O1 0.31 0.03 N 0.04 -0.12 0.08 0.3]~ N 0.15 -~.34 0.18 0.79 N 0.21 -0.39 0.14 1.15 N 0.46 -3.~! 0.12 1.3Z N 0.8~ -0.03 0.18 1.59 N l.SO 9.51 0.10 1-8g N 1.94 0.77 0.08 1.96 N 2.67 I .17 .!.. 73 2.05 2.51 3.05 3.44 Z. ,~ 7 ,'". 09 0.10 2.11 N 3.31 0.06 Z.2Z N 3.79 0.05 2.33 N ~.2,3 0.16 2.40 N 4.71 0.21 2..30 N 5.23 0.15 2.04 N 5.69 0.49 1.82 N 6.12 0.43 2.17 N 6.3'% 0.15 2.67 N 6.01 0.36 3.26 N 5.48 ,0 0 O. 0- O. . Z? 1. 2.66 3.31 :..,ga o.18 4.23 N 5.18 0.54 0.13 -~.17 0.04 8,.o~ N 5.z8 -z.~7 o.lz 9.4~ N 5.18 -z.~s o.~ ~o.5o -~.~s o.i~ io.86 N 5.18 -~.i~ o.3~ zo.sa N s.oa -z.as o.1,~ iD. TS N 5.36 '/" - '~,,.,,~..,~.,,~' L>.~,. :'~,,', .>'~ . .~ :. 4 $ · <,'.'~,,~ .,:,'.,',,? ,~2 '4' ,,',t,h~., '2 '.'-:', ~ · ' ,f ~ , .. ,., -o. }8 0.09 ",""' -0.47 o.l~ -a.i~ 0.08 9.9Z N 8.5~ 0.~7 0.~ Z. ~3 · ~~:~ ,~.+~ 8.55 N 10.41 0 34 ~J-' ', -,-, ~ 4.62 N 12 20 . .%.. :.,,,...,; ,~.~' -.,,~. , ,, "-',.' .' x<.?~ ':~'.:::'. P AGE ~, 118.00 FT' 3.93 N 57 Z7 W 4.39 N ,5:~ 4.0 W 4.8'3 N 61 l0 W 5.28 N 63 2 W 5.71 N 6~ 13 W 6.05 N 70 14 W 6.3.8 N 7~ 2.7 W 6.70 N 71 5 W 6.53 N 60 ~ W 6.38 N 5~ 16 W 6.69 7.5,2 8.49 9.63 10.81 11.75 12.04 12.01 12.02 L2.06 N 50 N 4,4 N 33 N 25 N 25 N 25 N Zb 1'2.22 N 33 12.55 N 35 12.85 N 38 13.11 N 40 48 W 13.35 N 43 29 W 13.52 N 46 12 W 13.59 N ~8 37 W 13.47 N 50 35 W 13.04 Iq 6~ 10 W 19.77. S 7i 8 W ~4 W 1'7 W 8 w 13 w 37 W 38 W 29 W I W 27 W ~,3 W I kf' .... ~2 W 4 W COMPUTATigN ARC3 ALASKA, /UPARUN VALUES ~,Z~8.O6 '~3~.3"~ 44~I.53 ~i0.33 'V E R T 'Z C ;, L D ::P Th, D~T ": 514 551 3 .~7 5.34 0.77 3.23 '~.35 t.o3 bOlS.OS 'SO~- S'E A ' £3UASE VERT'C.~L D,EVi.ATISN AZIiqUTH S2?Td .D~G' 'MIN D~£G MiN ~Z 2 6*9 6~3 6?0 6.16, 5. -:~ 7 .,a.. 3.~2 VERTZC S ECTi. FEi 1,3- 0 '~ C -B 4 i00 FEET &L, DOGLEG SEVERITY OEG~'IO0 DATE OF SURVEY: 5-OE, C-~ KE,LL¥ gUSHING ELEVATION:' ENGINEER:i: MCBRIDE OF. SUB-SEA DEPTH RECTANGULAR' COOROI'NAT E,S NORTH/SOUTH EAST/WEST FEET FEET FEE': 37.50 4.48 64,.27 3.68 9,~. 52 3.18 i~O.O0 2.90 1 8 ?..3, 1.73 238.75 1.02 .zgz. 17 0.1'9 34 5 ,. '-')6 0 . 16 ~.0.3.16 O. 12 ,%54. 74 ' 0'.4.,5 0 5 .52 70 Z3 36 05 3.3 40 O3 56.5. 023. ,~77. iOi~. 108,5. .7.6 .73 .93 .60 0.28 .37 2.35 2.5% 3.26 0.00 0.00 1333. 22.. 39 S aZ.39 S 66.27 S 94.76 S 12.7.67 $ 163.07 S 1 99.65 S 236.29 .S 273.02 $ 309.91 $ 30.17 W 3'I ,48.32 W 64.; T3.12 W 98 103.13 W 1,~0. 137.5.1. W 187. 174.78 ~, 239. 113.82. W 292. 253.2.9 W 346. 293.20 W 400.6,3 333.~B W 455.25 3&6.81 S 374.71 W 510.58 383.53 S ¢16.75 W 566.3? 421.13 S 460.47 W 624.00 459.56 S 505.~a W 683.15 498.49 S 551.8l ~ 743.64 539.70 S 601.28 W ' 808.71 5~Z.61 .S 655.95 ~ 877.32 615.89 S 711.55 W 9~7.65 668.80 $ 7~7.70 ~ 1018.15 711.33 S 823.7~ d L08~.40 755.87 $ 883.11 W 1162,42 805.5,3 5 9~8.71 W 1244,56 8b1.19 S 1021.27 W 1335.91 922.49 S 1101.50 W 1436.76 953.61 S 11~Z.33 W 1488.05 PAGE 5., ZlS..O0 Ff :MUTH MIN S 47 S 4.7 25 %4 ~7 2. 5 W W W W W W W W S 49 26 W S 49 39 W S ~9 51 W S 50 3 W S 50 8 W KuP4RdK N~R1"H $~_ij~ 4LASi~A COMPUTATION I;'4T'=RPOLATEg VALUZS FOR CAT:--: lO-DEC-8z, CHOSEN ,HORIZONS F~OM K5 5910.75 5953.i8 ~028.77 o148.72 6Z65.57 :ORIGIN: 38'7' TVD SUB-SEA, 5792.75 5835.18 5910o77 6030.72 6091.53 6148.57 PA~E .L 'DATE' OF SURVEY: 5-DEC-8~ KELLY 5USHIN:G ELEVATION: 118.00 E'NGIN~ER:' .M'CBRIDE' FNL, SURFACE ! FEL,.SEC RECTANGULAR NORTH/SO'UT 752.$4 S 772. $5 S 811.27 S 879.30 S ,." 917.06 S 953.61 S RIOE, T~S WEST 2 :;,22 ,'38 UH 'KUP .AAUK NORTH S',.OPE~ ALASKA TJP OP P.,5 R BAS':':' UPP f_k T~P UPP 'k SAN,.} 8AS~ :.... C v.,,' :E ,~ PCT.,) T.,2T AL D=PTm C.3MPOTA'TZ ~N DAT~: ,' .: ':: :'!::i o '.:, . , 5271.00 .. ~370 .go 66.21 ..,, OO SUMMARY ORIG T¥O FROM K6 5910,75 5~5Jo18 6I~8,12 ~26a,57 DATE OF SURVEY: 5-OEC-8~ KELLY ~USHING ~LEVATION: ENGINEER: IN= 387 SUB-SEA 5792.75 5835.18 5910.77 bO,30.TZ 5091.53 61~8.57 FNL, FEL, SEC R~CTANGULA NORTH/SOU 752° 5~ S 772.55 S 811.27 S 879.30 $ 917.06 S 953.61 S ~, ~.A ~> L~ ~, L J V :-;q 'r ~ c A~. VE R:T ZC AL O E ? T :-: L: PT H .S :~.; T .,i ~ 7uz,. C J bZg ~. 57 ~1~8.57 HDRIZ~NT~L O2PARTURE OIST&NCE A Z ',I t, IUT H ~E~T 066 M,.iN 1~86o05 S 50 8 W PAGE 118.00 FT RIOE, E S EST W 16 W z w ~ w 38 w ,33 w S UB-S URFA CE DIRECTIONAL SURVEY n~ UIDANCE ~'~ ONTINUOUS [-~"~ OO L Company Well Name Field/Location ATLANTIC RICHFIELD COMPANY 1L-15 (387' FNL, 143' FEL~ S31~ T11N~ RIOE,UM), ,KU, PAR_UK~, NORTH SLOPE ~, ALASKA _ _ _ Job' Reference No. 69850 MCBRIDE Date DEC-11-$4 Computed STEVENS SCHLUMBERGER . ARCO ALASKA, INC. ]L-iS KUPARUK NORTH SLOPE, ALASKA NOVEMBER S, !984 TVN PLOT FROM OCT DATA · JOB REFERENCE G98S0 WELL- 1L-15 SURFACE LOCATIO' - 387' FNL, 143' FEL, S31, T11N, ,,IOE, C~ VERTICAL PROJECTION -~m -~ooo -~soo -~ooo -soo o o soo v~~~-'-": ~ ;t~~i; :~: :~ ]'t:~-L~;i:~: ; ']~Z~;':Z:;'~Z:L~ZZ~"; ........ :1 ~ ; : ~ ~' ' ~ ~ :~ ~: ~ I~ , ~_- - ~- 4 & ; .................................................... ~ .................... ~_..__ : ...... ~ ................ : ...... ~ ......... ~ ............. ~ ..... ;. ~ ......... ~ ................................ ~. ......................... ~---~, ...... ~ ............ 7-~ ..... : .... : ..... ; .................................... : ....... ~n~'~- ....... :'": ............................ ; ............ ~ ........... , ...................... t .......... .~.%_; .................. ~j{%':_z ........................................ : ......... ¢_r_::.zz~r:q z.::;:: ::.:::'.:':'::.:~:'..:~rrr;': :: '4:::rr"'::}' ;-.:.:..'r.. ~. ;r-::;'... :':?- ~"~":::.':._::zz.::'".".~ ~ ............... ; .............. ~'~-; ............. ; ......... ~ ........................... t ..................................... * ................. ~ .................... ~ ..................... ~ ...~_..~__.~ ....... .~ ....... ~...~~s~.:.:~ ~ .............................................................................................................. ~ ...................; ..................................................................... ; .......... , ............. ; ........................ ; ......................... ; ...................... ; .......... ~ ...................................... ' I ............................ 4 .............. ; .......................................................... : ............. r .............. ~ .................................................. ' ........................ ~ .................... . ................................. 4 .......................................................................... ~ .......... ~ ~ ~ ........................................................... ~ .......~ ........................................ ~ ........... ; ........ L ............... ! .....x_.~ ............................................................ ; .................... ........... ; ....... ~ .................................... : ............... i ................................................. ; .... ....................................................... - ................... ~ ............ ~'-'7 ...............................................: .......................... .......................................................... ............................................ ~ ..................... ........................ ; ...................................................................................... ~ .................................... ......................................................... ? ................................................................................ .............................................................................. ~--'~---'~'~X-: .................................................................. - . .......... ?.-~ .-- ~-~-- ~.~ .......................... . ................................................ ................................................................ ~ ........... ~.~ ...... j ..................... ~ ........................ PROJECTION ON VERTICAL PLANE OF AZIMUTM 290 ...................l ~. ~L~Ljl~'~'" .......................... ~6I:~..ED IN VE~'rlC~L DEm'f~4$ HOP, I.~ S£~LE = :/SCO ~N/FT -50O -lO00 WELL' 1L-15 SURFACE LOCATIO"~ 387' FNL, 143' FEL, S31, TlI~, ,IOE, UM HORIZONTAL PROJECTION - i 500 -2000 -2500 -9000 -3500 .................... ~ .............. T .......... : ............................. ~ .............................. ; .................................. : I :::': :' :::::::::::::::::::::::: ::):": :::::::: -3000 -2500 -2000 - ~ 500 - ] 000 -SO0 0 SO0 ],bT 9L~.::CT ZONAL SURVEY C~JS T:3",I!:.R LI ST IN.., IL.-1 j 'q[;~Td .,LJFc, AL,~,SKA ':,L.;; V .! Y L ~x I :_z: LLk.~['.,iL..R: MC:~R IL'5 (,r.V IA f i,]N AND PRnJ:-CTLj 3NTO ~ T.AR:2, LT ~i: i M U f H AL [hlJTH CF SgUfti ~ :~ ~9 MiN i N ' . r,.,tt' K;;,[. /,T.!.'.) 'VALUES F.]K ;_VE.N 10D FELT OF 1..$dR"tl V RT ~CAL b 'PTH 'i i-. R T ~ t .,", L C JL;;<S d VERT ICEL dOGLEG U,=V/ATI,JN ~,ZIMUTH S CTiON SCVE'RITY i5:'t, Mi~',; L,'G MEN FELT ]""'/I00 0 ..~0 ~ bOO 7C'$ 1.56 .GO .00 . JO .30 .00 .JO .SO .30 .JO . O0 · .00 .00 .00 . -gO .bO S 0. CO 3.00 O.00 0.)0 O, ;; C J.OO O ..Jb O 3 14 0 S ,; 'J.OC 0.O0 0 J :'~ :],l :-_~ ,4 0.01 0.q. 3 U '.15 ..'.1 lq, L 'X --.).0[~ 0.05 9 1~ L, [0 2 L .,, --0. 31 0.1~, 0 Z:) N .~0 .3 4 -j.S7 O. IS 0 ~., N 7i d,3 ~ 0.2,, O.Ob O 25 ',1ii ,..Z W 0.5'i 0.13 C 'u N ~..i :~4 ~ 1.1. I. 0,1L C 15 N 't;'; ; 7 W i.41 0.0~ 0 1 ~ N T'7 Z.5 W 1.68 0.0= 0 1 ~ N o3 !O W 1. ~9 0.0~ O I , ~ Il L ~ 2.42 0..13 0 1.~ S 5~ 0 w Z.'Y') 0. 13 O 1~ 5 16 ~,'} W 3.~q 0.46 0 1'~ N g ~ W ]. 50 0.~a 'L; .. ~ N 31 3,~ [! 4 0.23 0 37 '1 l0 i t = 1. 36 . O.1a C 43 N '7 I W 0.66 0.09 0 ,,f ,'l q 3J a -0.02 0.09 O >., N 5 ,;'~ ! -,O. ~6 0.07 C ~ 5 N c I ~ 2 -2.01 0.09 ,J ~ 7 q i0 3 I W --2.68 0.I2 0 C :1 ,!.~ ~,) ,c -],.13 0.05 0 1 I 5 '5.s '2 ~ w -z. ~5 0.27 O "5 S 64 '11 W -L.32 0.05 ~ ;'" S ti ::I W -! ..-JZ O.Z6 O ~L .> >b I .i W 1. 30 0.11 O i 5 ~ 50 ) W L. 9~ O.Z1 O 2; 5 i6 S, N d.jl 1.13 5 3~ 5 32 ~ 5 W i 5,.~2 q.k5 i. _ i , .~a ,, .)a 33.00 5,93 OflTE OF SURVEY: 5-DEC-:14 KELLY JUSHIN5 ELfVATION: ENGINEER: MCBRIDE MEASURED 96PTH RRC. TANGUL&R NORTH/S]UTH FEET COORO E~ST/ FEET iN~TES WEST 0.0O N 0.00 N 0..53 N 0. 71 N 1.13 N 1..30 N 1.54. N 1.78 N I. 9 ,~ N 2.0d N 2.Z0 N 2.3~ N 2.3J N Z.3) N 2.0~ N 1.~" N 2.01 N Z.53 N J,.I3 o.04 N 5,11 N 6.J5 N 7.17 N 9.25 N 10.36 t4 lO .8,~ N 10.6,5 N 10.80 N 10.53 N 10.25 N 10 .Z0 a 10. I-* N 9. ~1 N 9.73 N 9.43 N 9. Od N 8.7l N 5.8~ N 3.56 S 18.75 S 0.00 0.02 0.1. 0. £0 0.~0 0.76 I .ZO 1.82 2.54 3.;1 3.71 4.15 4.62 5.14 5.63 6.0(+ 6.3~ 6.10 5.57 5.21 5.22 5.3~ 5.31 5,21 5.0~ 5 .ZO 5,86 6.53 7.21 7.$2 8.45 9.06 9.6/ 10.38 11.5', 17.17 27,31 HJRTZ. DIST. FELT 0.00 0.0Z 0.33 0.7~ 1.1)' 1.51 1.95 2.55 3.03 4.31 4,75 5.13 5 6.01 e,.31 ~. 6 '1 6.6Z 6.3~ 6.5 ') 7.35 8.31 9.~1 1~ .61 11 .~1 12..03 Ig.02 12.01 12.05 12.16 1d.4~ IL. 63 13.01 13.31 13.50 13.51 13.55 12.95 17.5 ~ 33,17 PriSE 118.00 OEPARTURi AZ IMUT H OEG MtN N 0 0 k N 8'1 4 W N Z5 18 W N 13 Z5 W N 20 10 W N 30 27 ".' N 33 1 ' N 4~ 36 N 52 ~,0 w N 51 OW N 5~ 19 w N 60 52 W N 62 4Z W N 65 34 W N 6~ 35 W N 73 14 W N 71 53 W N 61 I W N 60 40 w N 52 15 W N 3~ l~ W N 3/ 3d W N 40 17 W N 43 I w N 45 ti W N 4,:1 Z0 W N 50 0 W N 62 58 w S 78 16 W' S 55 35 W FT ;4iR EH SLCPE , AL.,~)KA ~" .~SJR' D ,~ P_ PT r't ,* o00. S0 ,:.. ,_00, ,.lC '. Jb,.)· 3U ', .,OJ. 3O ,., -, .0 ., 30 J. JO .;lDO.GU ',' 0O. ,, :~ '-' 0O. 00 ' .;Cd. CO .,,.: o 0. J 0 .~'i:,;3.'C ., .; U J. 5, 0 :.: J. dC O.dO J. OO J. J0 0 · .J (' J . ~ · '.)C I Wu'c ir.;l'.: PP[il..ATL..) '~/&LU~2,:5 F,3R :5~/b..N 103 Fi: 'T OF (. DLVi.&TI 'JN AZ IMUTH 'I.E. q T ' CoaL L> :.: '- T.,., ION b .; i £ £1U ,' .5 .~ 305 .,51 ~, 3:1 ":* ,q =. .3", 3. 3 '* 3 r:O 9 , )'1,_ D C G L ,E G $LVERITY J ~: ,5/lOG q.14 3.51 1.8,i 1.35 0.12 0.04 0.13 0.3~ O.~O ~.£0 ~.7~ O.?~ 1.0~ O.l~ 0.22 1 · 3.:~ /.10 ,,' .6~ 2.10 L. 0 0.0,.) O&fE OF SURVEY: 5-06C-84 KELLY BUSHING ELEVATION: ENGtNE£R: MCbalO': MEASURED O(PTH RdCTANGULAR NORTH/$OU[H FEET COCROiNATES HURIZ. E~ST/,~EST DIST. FEET FEET ~3.43 W 57.2~ 65.4J w ~io.11 '9Z.03 a 124.6,5 121..~0 W 166.00 15q.O; ~ Z10.48 ZZ2.,i W 30~.28 257.20 W 351.71 2~2.2¢ w 3'~. 39 .327.60 3.53.52 W ~O0.CO ~ 544.20 431.Z~ 475.61 514.36 55~.3~ ,4 746.31 5 36. 5 l 6~0.~5 ~ d=7. 53 6d5.6~ d S15.03 731 .3Z W 675.9 710.7 7 ,.o . 3 133.6 ~,J7 · 6 ~.'1.8 ?)3.6 717,13 ~4 1030.00 8i3.0i N 1037.45 810.35 4 11-~6.5> 9.20.00 w "~ 7 ~. I c lOZO.l 1 W 13'+2.00 1082.29 1140.0~ ~ ~455.13 11~2.33 W t~OB.05 PAGE 1!8o00 DEPARTURE AZIMUTH OEG MIN S ~,d 38 W S q~ Il w S a2 Z3 W S 6i 52 W S SO 0 S 50 8 5 53 8 w FT .,.~ C3 A L ~'~ i,.q &, INC. .x .J ;' ,~ W, J K b _v fh C~;MPI.;fATL','jN C, ZT':: IO-DLC-8~, I[IT, I~.'?OLAI[.O VALU,..S FOR EVEN I000 FEEl OF .~L;B-.~,C.'~ (.']URS,.: VERT [CAt. ODE, LEG V'E'RTZCAL [)"VLAT!JN AZZ~,!UTH S CT13N SkVER1TY UL -~T'I bZl] M'i',~ DzG MLN F ET i]E6/IO0 R ,'2 C T/1. N NORTH/ FEE ArE OF SURV[:Y: 5-DEC-84 ELLY 8USHING ELEVATZON: E,~GINEER: MC6~IDE [00EPT 8UL.~R S3UTH T COOR[) IN.~T FS EAST/WEST FEET O.0O 3.71 1.21 ~3.~3 363.52 717.13 t1~+2.33 PAG~ 3 118.00 DEPARTURE AZIMUTM DE,& MIN FT :..Ji. IPuTAT IjN D..il ' ' *"T,_kF'JLal'; 0 V'A,.U,.-3 F(JR ~::'¢iI"~ lC,; FO,.. T C,~- .~ U: '' c ~ V' .ql 'C4L 9 ViAT,.r jN 4." TMUTH I '.:, .:' J. )C 1 ;', ,:, . ,_ ,,) ~ .... .: U 2' i G j. '3 0 ,: ... (; ,.) ·; O ZJC .~..','O 2'~C S. ]0 ,, . L 1UJ. V.~.~ T, C at. S,:CTiON .SEVE RI'FY F :"_. E T 0. '3 C 0.0 O O. 0,,] J. O i 0.3 ! -2.12 0.C,j -';'. 3~, O.IB -$. 3 '; 0.14 -'J' .~1 L' .12 '-,3.:.)~ O. l:J J.Jl C.lc 0 , 7 Z 0.0 0 !.17 0.10 i.46 C.06 !. 13 C .0.3 ~. 05 0. lo :.51 O.Z1 3.0~ 0.13 J.J0 L.:~7 0.1:~ Z.,.)') . 0.3o 1. £3 0. 54 0. I 3 .-~ -,,. 15 0.17 -1.17 0.04 -,_. 17 O.lg --' '. 15 0.31 -~.05 -3.i4 0.34 -,' .i'~ O.03 DATE OF SURVL:Y: KELLY ~USHINJ EL,ZVATION: '2N'L, iN cE R: MC~RIOE )U~-- SEA [)EPT TAN,J!JL &R COORDiNATFS NORTH/sJUTH EAST/~EST FEET FFcT 0.03 N O.O0 O.O',j N O.CO 0.03 LI 0.0+ 0.37 N 0.15 0.7~ N O.Ll 1.1~ N 0.45 1.3L N 0.8~ 1. 5:~ N 1.J',3 1.&2 N 1 .94 I . '~ 5 N 2. c 7 2.11 N 3.3t ~.ZZ N 3.7~ 2.33 N 4.L3 Z.40 N 4.71 Z.30 N 5.Z3 ~ . 0 * N 5 - b ) l.b: N 6.12 2.i/ N 6..3~ Z.~,,'l N o.01 3.Z,) N 5.45 5.3j N 5.25 5.55 N 5.30 9.4~ N 5.1 ,.3 10.50 N 3 · ,'. 1 L0.~,b N 5.Id 10.58 N 5.03 10.75 N 5.36 HOR[Z. DIST. FEET 0.~)0 0.00 0.05 0 .~2 1.2~ 1.5~ 2.0: 2 3. ') 3 ~.39 ~. J 3 5.7~ 6.05 6.33 6.73 6.3d 7.52 8.z.~ '9.63 10.~! 12.0~ 12.01 12.02 [2.2£ 12.55 12.~ 13.11 13.35 13.52 13.5~ 13.41 13.0'* 13. 7: P ~GL ~ 1~8.00 OEPARTURE AZIMUTH Otg MIN N 0 0 i N 93 0 t N 2 ~. 5 ! W N 13 12 W N 21 41 N 3Z 25 N 3~ h 46 51 W N 5 3 42 W '! i= '~ 3 U R r.. (; u i-_ F T H T<U,. VC~T IC/.,L D _F' TH, C']NPtjfaf!,,]N L' :~f ' : 1J-ii' C-34 li, I"Rc,'i' ATt' j VALO,<3 FSR EVLq 100 ,Fe,/T OF [' ]UR3C: VERI ICaL DO SLEG D~V"A[ [[]N A£1MUTH S cC l'IijN SEVtRITY gcJU I'",IN C,,:G MLN Fsi [ D~ia/ 100 L)ATE OF SURVSY: KELLY BUSHING ELEVATION: ENGINEER: MCBRIDE SUS-3E~ DEPTH RECTANGULAR COORO NORTH/SOUTH EAST/ FEkT FEET 22.3? S 30.1 · ~, Z . 39 S 46.3 55.27 S 73.1 ':~4.7 ,~ S 103.2 121.6;' S 137.5 163.07 S ll4.'l I ~'~.6'~ S 213.8 2]5.2 ~ 'S 253.Z 27~.02 S 3U~.91 S 333.~ 3~6.dl S 374.7 353.53 S 4Z1.13 S 459.55 S 505.~ 53).70 S 602.2 5 ~2.6t 5 655.'~ 525.3t S 711.5 06'~.80 S 16~.7 7k1.33 S 823.7 ~>5.87 S 383.1 SJ5.53 S ~8.1 '922.~ 5 1101.5 953.61 S t1¢2.3 INATES HORIZ. WE.ST DIST. FEET .1 ,~ 0 · I ? 137.64 Z39.0~ 2~2.5~ 400.63 ~55.25 510.5S 566.31 62~.00 633.15 743.5~ B?7.32 9~7.65 1018.1.5 1088.40 1162.42 1335.91 1436.16 1~38.0> PAGE 3 118.00 FI DEPARTURE &ZiMUTH DEG MIN ].i~ -.q:;L"i..AT, ' 'VALU" !!, FDR Ci"tO.;t!'t'J rtL~R..r 20NS df.,: .I6, i. 1~ = f V3 :;, U :3 - 5 L A L).:,TL OF SURVSY: 5-0FC-64 KF. LL¥ OUSH,[N;3 ELEVaT [ON: ENGINEER: MC6RiDE 1!8.0-0 FT F;'JL ~ S !43' FL RL-C T URF&CE LOCATION L~ SEC 31, TlIN~ RIOE, ANGULAR ,COURDIN.~TZS TH/SOUTIi EaST/WEST 5£.~4 S 878.72 W ?Z.55 S 905.~b W 11.27 S '~56.L2 W 7~.30 S 104~.7~ W [?.Ob S 1096. J8 W 53.51 S 1142.~3 W UH [,]MPUTAT.I ON I0-OEC-84 SUMMARY DarE OF SURVEY: 5-OEC-8~ KELLY dUSHING ELEVATION: £NGiNEER: MCBRIDE PAGE !18.O0 1',.jP UF'P ::k ~AI,.j T.~TAL L':'FTn ::~ ,Z L 7. C' :) ';: 5 i q . u 0 L- ,5 ;:,' i .OC ,': 7 0'~ .C] 5 ) 1 J. I 5 60;'.. ~. 11 SURFACE LOCATION AT ORIGIN= 397' FNL, 143' FEL, SEC -~1, TllN~ RIOE, 1'¥'0 RECTANGULAR COORDINATES SU~-S[ ~ NORTH/SOUTH E~ST/WEST 57)2.75 752.5~,. S 878.52 .C;335.1J 772.55 S ~05.J6 ~'~10.7 I ~1 1.27 S '~56.2~. ,~030.72 t7).30 S 104~.)4 60~1.53 ~l/.Ou S 1094.38 61~8.5~ "J 53.~1 S 1142.33 F- i ~',l A L 4 f_. L L L 'J C "T ' '], J .4 t ]' .., : I ~lJ _ ¥ "R f l!:,,k:'_ L, ' F T H 6Z.L,~. '5 ! .~lJ '- .~t_h V'(,,.~I LEAL .$ ;:: T 4 HDR IZ'JNT~L DEPARTURL O ! 3 T AN,:] E ~t Z IMUTH 7E'-T DoG M£N 1,:.85.05 S 50 5 UM Su~gesta~ form to be inserted in'each "ACt-Jvc'' well folder to d~.eck for tirmly ccr~liance with our' rcgulations. Oparator, ~]'Z ~;an-e' ' Num]::er .. Reports and Materials to be received by: Ih:ate _Required Date Received Remarks °. C~re Chips -. . .Registered Survey Plat ye,.~,. ~ '/7'-2y dC Inclination Survey Prcdactic~n Test Reports . Logs Run., ~ Yes ARCO Alaska, In,... Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 November 21, 1984 Mr. C. V. Chatterton Commi s s i one r State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Monthly Reports Dear Mr. Chatterton' Enclosed are the Monthly State Reports for the following wells' 2G-14 1L-1 2D-3 2X-16 2G-15 1L-16 2D-2 2X-15 2G-16 1L-15 2D-1 2X-14 2E-16 2W-5 WSP #2 Sincerely, A~~ a~~----F~~g Engi neer JBK/SH/tw. HILL/05 Enclosures RECEIVED Alaska Oil ~ G'~s COns. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCornpany ' - STATE OF ALASKA ALASKa, OIL AND GAS CONSERVATION L _,MMISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drilling well [] X Workover operation [] 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 84-183 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21204 4. Location of Well atsurface 387' FNL, 143' FEL, Sec.31, T11N, RIOE, UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation an, d Serial No. 118' RKB, PAD 88'I ADL 25659 ALK 258:5 For the Month of. October , 19 84 9. Unit or Lease Name Kuparuk River Unit 10. Well No. 1L-15 11. Field and Pool Kuparuk River Field Kuparuk River Oil Pool 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well ~ 0815 hrs, 10/1,_9_/84, Drld 12-1/4" hole to 3490'. Ran, cmted & tested 9-5/8" csg. Performed top job w/150 sxs A5 I. Drld 8-1/2" hole to 6704'TD as of 10/22/84. Ran logs. Ran, cmtd & tstd 7" csg. Secured well + RR @ 0800 hrs, 10/24/84. 13. Casing or liner ru.n and quantities of cement, results of pressure tests 9-5/8" 36# J-55 BTC csg w/shoe @ 3475' Cmtd w/1025 sxs AS II I + 700 7" 26# J-55 BTC csg w/shoe ¢ 6704' Cmtd w/275 sxs Class "G" Sxs C] ass 14. Coring resume and brief description N/A 15. Logs run and depth where run DIL/SFL/SP/FDC/GR/CNL f/6696' BHCS/GR f/6684' - 6000' 3477' 16. DST data, perforating data, shows of H2S, miscellaneous data N/A R£'CEIVED NoV 'z 6 Anchorage 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SIGNED ~.////~~~~ TITLE Area Drilling Engineer DATE /- ,¢ [/' /'/ ~ - ..................... "/ ,/ ' NOTE--R~rt ~¢~ t~//orm is required for each calendar month, regardless of the status of operations, and must be filed in' duplicate with the Alaska Oil and Gas Conserv~on Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 HI LL/MR28 Submit in duplicate -. ARCO Alaska, inc. Post Office ! .360 Anchorage, Alaska 99510 Telephone 907 277 5637 RETURN TO: -. ARCO ALASKA, INC. ATTN: Records Clerk ATO-1115B P.O. Box 100360  'chorage, AK 99510 · . /> rans itted herewith are the following items. and return one signed copy of this transmittal. Date: 11/19/84 Transmittal No: 4858 Please acknowledge receipt OH LIS TAPES/Schlumberger i 1L-15 10/23/84 Run 1 2G-16 10/22/84 " 347O - 6694 //69652 2899 - 7897.5 ~-'fl39653 /ca~ Receipt Acknowledged: DISTRIBUTION B. Currier Drilling W. Pasher BPAE Geology Chevron Mobil G. Phillips Sohio Phillips 0il Union D & M NSK Ops. J. Rathmell Well Files MEM'ORANDUM TO: THRU FROM: State of Alaska Co~issioner Doug Amos '~u'~ Petroleum Inspector D.41.43 TELEPHONE NO: SUBJECT: Witness BOPE Test at ARCO's Kup 1L-15 Well, Sec. 31, TllN,R10E,b%¢, Permit No. 84-183, Parker Rig No. 141. Saturday, October 20, 1984: i traveled this date from Nabors Rig ~-6~~ark~ ~ig' No. %-41--to witness the BOPE test there. The test commenced at 8:45 pm and was concluded at 9:00 pm. There was one failure which was repaired and retested before drilling out the 9 5/8" casing shoe. I filled out an AOGCC BOPE test report which is attached. in summary, I witnessed the successful BOP test at ARCO's Kup 1L-15 well. There was one failure during this test, please see the attached inspection report for details of this failure. Attachment 02-001A(Rev 10~79) : O,r,,G #,4 STATE oF ALASKA AI.~SK~ OIL & GAS CONSERVATION COMMISSIOI'I B.O.P.E. Inspection Report Inspector ,.,.. Date Well Operator ~ ~- ~_~ Representative Well ~L~, I~-- ~S Permit # Location: Sec ~ { T [I l,,J R 1O~ M ~, M,~ ~ "6/'~~1 Casing Set Drilling Contractor~~'N~ Rig # ~'~ I Representative · Location, General Well Sign ~ .... General Houseke eping~ d~ Reserve pit '~l'<' , BOPE Stack Annular Preventer Pipe Rams ~~u-'- Blind Rams ~ Choke Line Valves~/~ H.C.R. Valve Kill Line Valves'~?-~ Check Valve Test Pressure It .. ACCUMULATOR SYSTEM Full Charge Pressure. ~id~Z~d~ psig Pressure After Closure ~)~OfD psig 200 psig Above Precharge Attained: min~sec. Full Charge Pressure Attained: ,-.~.. min ~1'~ se~:~ N2 ~1 7 ~, i~[-'~.:Z~°°~ Z'~--'~('~ ~sig Controls: Master Remote ~ Blinds switch coverh'~ Kelly and Floor Safety Valves Upper Kelly ..~: Lower Kelly Bal 1 Type Ins ide BOP Choke Manifold No. Valves No. flanges % ~Test Pressure I ~'Test Pressure · ,. ~ ...~ Test Pressure Adjustable Chokes Hydrauically operated choke Test Results: Failures I Test Time I hrs. I~ -Repair or Replacement of failed equipment, to be made within ~ days and Inspector/Commission office notified. Remarks: -~4o.. ~4%~T~ k~x~A~. V~L-~ kl~F~ ~.2~A~'1~4C~ ~V~ Distribution orig. - A0&GCC' cc - Operator cc - Supervisor Inspector---~O~ '~0~ October 12, 1984 Mr. J. B. Kewin Area °~' Drlzzzng Engineer ARCO Alaska, Inc. P. O. Box A_nchorage, Alaska 99510-0360 Re: Kuparuk River Unit 1L- 15 ARCO Alaska, Inc. Permit No. 84-183 Sure Loc. 387'F!~, !43'FEL, Sec. 31, TllN, R]0E, Btmho!e Loc. !452'FI,~, 1404'FEL, Sec. 31, TI1N, R10E, Dear Mr. Kewin: Enclosed is the approved application for permit to dr~_].l the above referenced well. If coring is conducted, a one cubic inch chip from each foot of recovered core is required. Samples of well cuttings and a mud log are not required. A continuous directional survey is required as per 20~ AAC ~5.050(b)(5). If available,_ a tape contazni~.g the digitized log info~ation shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems hmve been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.05.870 and the regulations pro~!gated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you rmy be contacted by the Habitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thmreunder (Title !8, Alask~ Administrative Cod~, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to commencing operations you may be contacted by a representati~e of the Department of Environmental Conservation. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention October 12, ]984 equipment so that a representative of the Com~,~ission may be present to witness testing of the e~uipment before the surface casing shoe is drilled. Where a di~jer~er system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may w~tness testing before drilling below the ghee of the conductor p~pe. In the event of suspension or abandonment, please g~.ve this office adequate advance notification so that we may bare a witness present. Very truly yours, ~-. _. ~ -7f'~- Lomnie C. !'=Smith Com~i~ ~ioner of A!a~ka Oil and Ga~ Consez~ation Commission BY O~DER OF THE CO~-~ISSION be Enc Io sure cc: Department of Fish & Game, Habitat Section w/o encl. Depart~ent of Environmental Conservation w/o encl. ARCO Alaska, Inc. Post Office B(~,. ~00350 Anchorage, Alaska 99510-0360 Telephone 907 27.6 !215 October 8, !984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Kuparuk 1L-15 Dear Mr. Chatterton: Enclosed are: ° An application for Permit to Drill Kuparuk 1L-15, along with a $100 application fee o Diagrams showing the proposed horizontal and vertical projections of the wellbore ° A proximity plat o A diagram and description of the surface hole diverter system ° A diagram and description of the BOP equipment Since we estimate spudding this well on October 15, 1984, your earliest approval will be appreciated. If you have any questions, please call me at 263-4970. SinceTly//~ J. B. Kewin Area Drilling Engineer . . JBK/JG/tw Attachments Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA OiL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL I?qX REDRILL [] DEEPEN [] lb. Type of well EXPLORATORY [] DEVELOPMENT OIL E~X DEVELOPMENT GAS [] 2. Name of operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 387' FNL, 143' FEL, Sec.31, TllN, R10E, UN At top of proposed producing interval 1270' FNL, 1189' FEL, Sec.31, T11N, R10E, UN At total depth 1452' FNL, 1404' FEL, Sec,31, T11N, R10E, UN SERVICE [] STRATIGRAPH I¢%1~ SINGLE ZONE [],*~ MULTIPLE ZON E~]!-..,. ~.? "?~;. , . ~. 't . 9. Unit or lease name -' Kuparuk River Unit 10. Well number 1L-15 11. Field and pool Kuparuk River Field Kuparuk River Oil Pool 5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no. RKB 118'~ PAD 88' ADL 25659 ALK 2585 12. Bond information (see 20 AAC 25.025) I;ederal Insurance Company Type Statewide Surety and/or number #8088-26-27 Amount $500~000 13. Distance and direction from nearest town 15. Distance to nearest drilling or completed 30 mi. NW of Deadhorse lL-16well 58' ~ 1250'MD feet 16. Proposed depth (MD & TVD) 6837' HD, 6303' TVD 18. Approximate spud date 10/15/84 14. Distance to nearest property or lease line miles :~828' (~ TD feet 17. Number of acres in lease feet 2490 20. Anticipated pressures MAXIMUM HOLE ANGLE 39 o (see 20AAC25.035(c) (2) Proposed Casing, Liner and Cementing Program 19. If deviated (see 20 AAC 25.050) 2706 psig@ 80°F Surface KICK OFF POINT 3600 feet. 3037 psig@ 6148 ft. TD (TVD) 21 SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data) 24" 16" 62.5# H-40 Weld 80' 29' I 29' 109i 109' + 200 cf 12-1/4" 9-5/8" 36.0# J-55 29' 29' 3468~ 3468' 1025 sx AS Ill & BTC 3439' HF-ERW ~ I 700 sx Class G J-55 BTC 6809' 28' I 28' 6837'1 6303' 400 sx Class G blend 8-1/2" I 7" 26.0# HF-ERW I 22. Describe proposed program: ARCO Alaska, Inc., proposes to drill a Kuparuk River Field development well to approximately 6837' MD (6303' TVD). A 20", 2000 psi annular diverter will be installed on the 16" conductor while drilling the surface hole. The 9-5/8" casing will be set through the West Sak sands at approximately 3468' MD(3468' TVD). A 13-5/8", 5000 psi, RSRRA BOPE stack will be installed on the 9-5/8" surface pipe. It will be tested upon installation and weekly thereafter. Test pressure will be 3000 psig (1800 ps~ for annular). Expected maximum surface pressure is 2706 psi. Pressure calculations are based on latest reservoir pressure. Surface pressure is calculated with an unexpanded gas bubble at surface, including temperature effects. Selected intervals will be logged. The well will be completed by the workover rig with 3-1/2", 9.2#, J-55, 8rd tbg. Non-freezing fluids will be left in uncemented annuli through the permafrost interval. Selected intervals will be perforated within the Kuparuk formation and reported on subsequent reports. A downhole safety valve will be (see attached sheet) 23. I hereby certify that~/~regoing is true and correct to the best of my knowledge The space below for Commission use TITLE Area Drilling Engineer CONDITIONS OF APPROVAL Samples required i Mud log required I Directional Survey required [Z] Y ES ~:LNO t []YES [~NO I ~YES ~INO ..... ,~ ~ I pp a cate Permit number r~' 1 "/~/~) /i /12/84 ~ APPROVED BY Form 10-401 GRU1/PD20 Rev. 7-1-80 ,COMMISSIONER DATE October 12, 198/4. by order of the Commission Submit in triplicate SEE COVER LETTER FOR OTHER REQUIREMENTS IAPl number 50_ O t,,~)-'"~t PERMIT TO DRILL 1L-15 installed and tested upon completion of the job. 1L-15 will be 58' away from 1L-16 at 1250'MD. There are no other close wellbores or crossings anywhere downhole. Top of cement for the production string will be placed at $392'MD, approximately IO00'MD above the top of the Kuparuk Sands. Reserve pit fluids will be disposed of down the 9-5/8" x 7" annulus. The 9-5/8" x 7" annulus will be left with a non-freezing fluid during any interruptions in the disposal process. After the workover rig has moved off location, this well will be fracture stimulated. , ......... :-;::~ ..... ~_._. i-"-- i. ..... --~ ........ I .... ~ ................. ~ .... ~. .... ,~ .... i ..... ! ............ i ..........: ~ ~ I ' ~_._____. _.:-_ , .. .... ....... ~ -i-,;. ............. , E~,~mE--~---E--R~F'-ROS-~~ ~~: ............... '" ....... & ............ ' i-: "!~ ............ =--= |~ ........ ..... ~; ................ ..... ! - ii .... - ..~ ...... }. ............. ~ .............. ~ ....................................... : ....... : ..... 1: .... ~::¢-----3 ............. i~, ....... 4---: .... i-~- :---'--~---~ ......... t ....... [ .... t '" : '"I ! · ...... · ......... ~ ....... *OP{-UGNU SIdDS~ ..... TVD,-'2418i ............ ! .................. i ..... ' .... ! ' .... .~...~ ................. ~ ............. :~ ..... : ..... , ......... z ............... 4 ............ , . ! - . . i . ....... ::a~-.: ...............! ........... :--- , ................. t .................. , ........... : ' '' . .. ! . .: ~ ........ , ........ j-- l-.- : { ."o , .... BUILD 31D£~ ----~ ........... ~ .... .--j.. ~ ....... :PER lOP_' ~T ......... ..... i-- - { -t ..... _ . ........ ~ ' i ' i ' · . . , ~ · ' ~':-: .... -:"' iffOP -~ :TVD~958' DEP~i 369 CNTR t -'TVD~6053 B^SE-:KUP._:SNDS '_' T,,VD-61' 6515 DEP=1446 TMD=663T DEP,=1 524 ~ ~ .... ?z ..t. '"; i"- !;" ; . ................. ; .... ... ~., ~.. · . .... SCALE:::, I WELL:NO {OPOSED ARUK-Ft ELD, SL ii Surface Diverter System 1. 16"-2000 psi Tankco starting head. 2. Tankco quick connect assy. &. 16" X 20" 2000 psi double studded adapter. 4. 20" 2000 psi drilling spool w/10" side outlets. 5. 10" ball valves, hydraulically actuated, w/lO" lines to reserve pit. Valves to open automatically upon closure of annular preventer. 6. 20" 2000 psi annular preventer. 7. 20" bell nipple. i Maintenance & Operation 1. Upon initial installation close annular preventer and verify ~hat ball valves have opened properly. 2. Close annular preventer and blow air through diverter lines every 12 hours. 3. Close annular preventer in the event that gas or fluid flow to surface is detected. If necessary, manually override and close ball valve to upwind diverter line. Do not shut in well under any circumstances. 16" Conductor AlasKa Oii,~ ~ Gas Cons. Comrnissio~. ~ * A NULA R£VENI' PIP]~ RAM~ BLIND ' ~ q 2 DIAGRAM ~1 13-5/8" 5000 PSI RSRRA BOP STACK 1. 16" - 2000 psi Tanked starting head 2. 11" - 3000 psi casing head 3. II' - 3000 psi x 13-5/8' - 5000 psi spacer spool 4. I3-5/8" - 5000 psi x 13-5/8" - 5000 psi drilling spool 5, 13-5/8' - 5000 psi pipe rams 6, 13-5/B" - 5000 psi drilling spool w/choke and kill lines 7. 13-5/8" - 5000 psi pipe rams 8. 13-5/8" - 5000 psi blind rams g. 13-5/8" -.5000 psi annular ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC F1. UID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITlt 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH C~LARGING PUMP OFF. 4. RECORD ON NADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. 13-5/8" BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. 2. 'CHECK THAT ALL HOLD DOWN SCREWS ARE FULLY RETP~ACT- ED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK DOWN SCREWS' IN HFJkD. 3. CLOSE ANNULAR PREVENTER AND ¥'./~¥~S LI~S~ OF DON-~T TEST AGAINST CLOSED CHOKES 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD 'FOR 10 MINUTES. 5. INCREASE PRESSURE TO 1800 PSI AND HOLE FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7, INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 B. ~'?I~ESSbl~B Z)O~&~ OF CItOI<~ ISOI_A?ION I~/IJ~Tv']~S~, TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD.VALVES, IF ANY, WITH 3000 PSI UPSTRF, gJ~ OF VALVE AND ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. OPEN TOP SET OF PIPE RAMS AND CLOSE BOT'FOM SET OF PIPE RAMS. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 MINUTES BLEED TO ZERO PSI. OPEN BOi'FOM SET OF PIPE P, AMS. BACK OFF RUNNING JOINT AND PULL OUT OF .HOLE. CLOSE BLIND RAMS AND -TEST-.TO 3000 PSI FOR. 10 MINUTES. BLEED. TO ZERO PSI. OPEN BLIND P-AMs AND RECOVER TEST PLUG. MAKE SURE' ' MANIFOLD AND LINES ARE 'FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN DRILLING POSITION. TEST STANDPIPE VALVES TO 3000 PSI. TEST KELLY CDC)CS AND INSIDE BOP TO 3000 PSI WITH KOOMEY PUMP. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM SIGN AND SEND TO DRILLING SUPERVISOR. BOPE TEST ONCE A WEEK AN~'FID!C-:. ' PERFORM COMPLETE TIONALLY OPERATE BOPE DAILY. ~''' ,L~ :"..... 10. 11. 12. 13. 14. 16. ARCO Alaska, In Post Office ,..;ox 100360 Anchorage, Alaska 99510 Teiephone 907 276 i215 September 14, 1984 Mrs. Elaine Johnson State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Conductor As-Built Location Wells 1-8, 9-16 Dear Elaine' Enclosed you have Sincerely, are as-built location any questions, please J. Gruber Associate Engineer JG/tw Plats GRU1/L36 Enclosure - 1L Pad plats for the subject wells. call me at 263-4944. If ARCO Alaska, Inc. is a Subsidiary of AtlanticRJchfieldCompany i i i i I DRIL "'"TE 1-L CONDUCTORS I ----'" AS. ,.,JILT LOCATIONS I ~%:_._.~ -_ . :_:.-~--_ _: .. :- .-. .... ::_.:- _ .... :- _._..:.. :_-..~__. :.- ................... LOCATED INSEC 32,TIIN RIOE UMIAT MERIDIAN ,NELL NO. 9 ' Y:5,D48,644 746 LAT 70© 16 14 2588 X: 540,282 27~ LONG. lag°40' I 217 FWL 325 FNL ELEV.: 88 48' O. O: 8L.2' F WELL NJ. I0 , .~:5,948,584.53£ LAT 70c 6'! ~,6666" ' X= 540,282 887 LONG. 149° 40'27.199" · i o 217F'A'LSB6FNL ELEV-- 88.19' 0 G: 823' i 'NELL NO II ,, . ' ¥:5,~48,525.141 LAT -()c. ,6'!505259,' X-- 54(),£83 517 LONG. 149° 4~' 27 lB ' o ! ' 217 f:-'¢,'L 445FNL ELEV: 8.9 J ' O C,.: 82 4' WELL HO. 1'2_ ! ' : ' Y:5,94.8,464 653 LAT 70u '6' 12 4,q '4" X: 540,264.168 L?)NG 143":-' ,;0' 27 I i 217 FWL 506 FNL ELEV.= 9765' U O 9d 4 I LOCATED ~N SEC 51, TIIN RICE ~Jf'.,IIAT MERIDIAN SEC. 30 SEC. ¢,'_':LL Nf) 13 --- .'~ ..... 7:5,94-8,461 165 LAT 7%'') ~6' 12_: 4 SEC. $I ' SEC.' X: 539,924.iq.F¢ LONG ~,4.).°4')'3;' 651" 2I 1,45FEL 507FNL ELEV.-- ,9765 O.G : 834.' i NE LL NO 14 I ~ i "f: 5,94 ,9,52 I. 036 L AT 7,.)716' I ~ X: 53.),923542 t )HO ~4~:'4C'37.675" ! ;43FE,_ 447 FNL ELEV.:B','.~7 ' 0:83 5' ~ WELL NO 15 I ~ Y:5,948,581 ,J87 LAT 7-')'-:'!6 136516 i 16 · · 9 X: 533,922936 L'..:,,".~O 4'3°40'37 678" . , 143 FEL 387FNL ELEV: 87 76 C.G --83 2 ~ I i 'NELL ~',1 g. 16 - I 14 e I ·11 'r':D,94q,64~ 039 LAT 70© 16' ,4 2413 ..... JJ' ' X: b3~¢,922 390 LONG 14a': 4'3' 37.685" i j !43 :'EL 327 F'.JL ELE,,/: 976'..a' '.') O 82_ iI ' SCA~E: '1"= 30 0" .-.-,~'~" OF AL ' ~"'~,. . ..... . ';,- · ~., -.'.' .,' · ~. ,,Ii --' z-¢ ' -. ,*~ '*11 . ..'.::'.. '.% :'K'%:TR--TE.~, ._-! CT~ONS 31,32 r:_:,WNSHIP ,iN, . .... ' ..... P:.'~')E '-)~ , ' M~AT MERIDIAN ~,.~'_.r.R ~'~ ,C~,... Ai,'Iska Oil & 6as O- 1~":",'~ ,,, '~':" ,,,'"",-,,'""';'"':-'""" -" :._:..'.~":, ':: E,_F_',,LFiON iS ' L M',DDLE & I L SOt.-rH PER LHD OtiS. 60/'rlrnj$~i~ ,-~ - :'eec, · ~- . ,, . ,~ A':_..SQC',ATES BASIS OF LOCATION 'S iL NORfH & i L Anchorage - .,,-. ., '~ , - cL...:Td PER LHD & ASSOCIATES. ~.'~ z5 // ~'o '\ ~'~ "~! 2'a'~ ~e LiCF%3Eq TO PRACTIC~' LAND CURt, EYING IN THE STATE O -"~-'q - ~ ',h ~';';,".") A: A:-~A B THAT THiS FLAT REPRESENTS A SURVEY MADE I ~ I-- tt3,; ,'/[ ~",'':! UN:E', MY DINECT S,JPlFR'vISION ~ THAT ALL DETA,LS ARE /~ /~' L~.' _Li "~'"'~'".. ~ Cnr~,'ECT ~,S O~- e/~_/a4 WELLS 9~ , 8X a/e¢ WE~_,._~- ,,-it, ~.,.--'~,-,.-, ' ARC lask~ , Inc. }'''''' ...... i: D. i ....................... ~" "k, ~.L ..,~ ':"~,'r~._) :~ ' -["~""- ...... DRILL SITE 1.L ! ',.~. , ;.~ ..... ,,,o.-,-,-, ,.,o ~.,,.~ ,..,,,.,,.%_~:,~ ~l.;:;dl:~ ~-:'~ CONDUCTOR AS.BUILT tb j i ,, ,O C ,,,T , O ,,, ,, :- ,. :1 mi. ~.~..,,~ ...... ~ ~,,,,,~ Drauqhtsm(]n: Syo'ne)' Owg. no.: NSK 905 1i2~2 CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. ITEM APPROVE DATE YES NO REMARKS (1) Fee (2) Loc ~t h~ru ( a"[ '~'~~' 8) (3) Admin ~~ {.~ thru (10 a~d ~)' (4) Cas~ ~ /p.//-~ ~12 thru 20) E (21 thru 24) (6) Add: · 2~ 3. 4. 5. 6. 7. 8. 9, 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. Is the permit fee attached .......................................... Is well to be.located in a defined pool ............................. Is well located proper distance from property line ................. well located proper distance from other wells ................... Is Is sufficient undedicated acreage available in this pool Is well to be deviated and is well bore plat included ............... Is operator the only affected party ................................. Can permit be approved before ten-day wait .......................... Does operator have a bond in force .................................. ~ Is a conservation order needed .... --/ Is administrative approval needed ................................... Is conductor string provided ........................................ Is enough cement used to circulate on conductor and surface Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will surface casing protect fresh water zones ....................... · 'Will all casing give adequate safety in collapse, tensio~ and burst..~ Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate well bore separation proposed ........................... Is a diverter system required ....................................... Are necessary diagrams of diverter and BOP equipment attached ....... Does BOPE have sufficient pressure rating - Test to ~z~-~-~ psig .. Does the choke manifold comply w/API RP-53 (Feb.78) .................. Additional requirements ............................................. o ~Z ._ Geology: Engin~e~ring: JAL//~-x_~ ~ ' rev: 12/08/83 6.CKLT , , INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE , , Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIx, No special 'effort has been made to chronologically organize this category of information. ., ....... , -.._. _.. :/.,, .. , ~ . ~ ~ . .. , ~ ...... _, ... -~ ,. ,., ~, .... -: _, r '~ ." · ', ~ ~ '~ ' -' · ~.. ..... .. . ......... - ~ - r .., -~.'" !:.. i:/'?.~ .... ?'? ?, ai~' ,30 l?.?l.:,.' ~,'-' -?;-}., 2! }2