HomeMy WebLinkAbout1921091. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program
Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: CTCO,Cmt Sqz, N2_
Development Exploratory
3. Address: Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number): 8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured 9,170 feet 5,534; 8,597 feet
true vertical 8,283 feet ~8,530 feet
Effective Depth measured 5,534 feet 5,374 feet
true vertical 5,045 feet 4,902 feet
Perforation depth Measured depth See Schematic feet
True Vertical depth See Schematic feet
Tubing (size, grade, measured and true vertical depth)2-7/8" & 1-1/2" 6.4/L-80 & 2.75/J-55 5,955 & 2,944 (MD) 5,414 & 2,858 (TVD)
5,374 MD
Packers and SSSV (type, measured and true vertical depth)Baker Prem Pkr 4,902 TVD SSSV: N/A
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure: N/A
13a.
Prior to well operation:
Subsequent to operation:
13b. Pools active after work:
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Authorized Name and
Digital Signature with Date: Contact Name:
Contact Email:
Authorized Title: Contact Phone:
Jake Flora, Operations Engineer
323-433 / 323-451 / 323-506
Sr Pet Eng: Sr Pet Geo: Sr Res Eng:
WINJ WAG
0
Water-BblOil-Bbl
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Noel Nocas, Operations Manager 907-564-5278
jake.flora@hilcorp.com
907-777-8442
N/A
Representative Daily Average Production or Injection Data
Casing Pressure Tubing Pressure
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
0
Gas-Mcf
MD
0
Size
165'
0 0705
0 2050
800
9-5/8"
7"
Intermediate
20"
13-3/8"
165'
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
192-109
50-283-20088-00-00
3800 Centerpoint Drive, Suite 1400
Anchorage, Alaska 99503
Hilcorp Alaska, LLC
N/A
5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work:
ADL0032930
Ivan River / Undefined Gas Pool
Ivan River Unit 41-01
measured
true vertical
Production
Liner
3,498'
9,152'
Casing
Structural
3,335'
8,266'
3,498'
9,152'
165'Conductor
Surface 895'
TVD
4,750psi
7,020psi
3,450psi
6,870psi
8,160psi
895' 894'
Burst Collapse
1,950psi
measured
Packer
Plugs
Junk measured
Length
p
k
ft
t
Fra
O
s
6. A
G
L
PG
,
Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov
By Grace Christianson at 4:03 pm, Oct 19, 2023
Digitally signed by Noel
Nocas (4361)
DN: cn=Noel Nocas (4361)
Date: 2023.10.19 13:55:03 -
08'00'
Noel Nocas
(4361)
Rig Start Date End Date
8/3/23 9/23/23
08/03/2023 - Thursday
PJSM and PTW, SIMOPS with production and construction
SITP 53psi. MOBE equipment from DW2 to Ivan river. Spot coil equipment, crane, tanks, and manlift.
R/U Fox CTU, fluid pump, iron. M/U BOPEs to riser and stack on well. M/U choke and kill lines
Fluid pack iron and shell test BOPE's. Test BOPE's per AOGCC and Hilcorp standards to 250psi/3000psi - Test good
AOGCC witness waived by Jim Regg via Email on 8/2/23 @ 9:05AM. Secure well, load supply tank with 130bbl of
produced water
SDFN
08/04/2023- Friday
PJSM and PTW. SIMOPS with production
Travel to location
SITP 53psi. Pick up injector head
M/U CTC, check valve, stinger, and 1.70" OD Nozzle.
Fill lines with produced water
Pressure test lubricator and stripper to 250psi/3000psi - Test Good. RIH, come online with 800scfm N2 and 0.75BPM
produced water.
Clean out to 5,550ft getting good returns, lost returns at 5,500ft.
S/D fluid pump and bring N2 up to 1200scfm.
RIH and tag bridge at 5,683', wash through bridge and RIH to 5,800ft.
Got returns back of heavy grey sand.
Pump N2 at 1200scfm for 20min then POOH. Returns of N2 and slugs of sandy water. POOH to 3,000ft while pumping
N2, SD N2 and POOH to surface.
Small amounts of gas in returns.
At surface take well to blow down tank and it died in a few minutes. RIH to attempt 2nd N2 lift, decision made to let the
well build pressure on its own for 2 days. POOH
Secure well
R/D Fox coil, N2 and Cruz crane
SDFN
Travel to camp
Daily Operations:
Hilcorp Alaska, LLC
Well Operations Summary
API Number Well Permit NumberWell Name
IRU 41-01 50-283-20088-00-00 192-109
Rig Start Date End Date
8/3/23 9/23/23
Daily Operations:
Hilcorp Alaska, LLC
Well Operations Summary
API Number Well Permit NumberWell Name
IRU 41-01 50-283-20088-00-00 192-109
09/16/2023 - Saturday
PJSM, Discuss coil & plug setting operations. Crew travel to location & check wellhead pressures casing pressure-0. PIck
up head & lubricator, rehead coil to run CIBP, pull test to 30k, pressure test to 3000 lbs, Make up setting tool & plug.
Connect lubricator & head, Pressure test to 3000 psi-good. Run in hole on coil with max od 2.19", plug OD 2.10" tag @
5676' wash down 5681', unable to pass 5681', pull out of hole to pick up wash jet. Pull out of hole with plug assembly.
Disconnect & pick up head & lubricator, change out tool assembly. Pick up & make up wash head assembly Max OD
2.125".
Make up head & lubricator & pressure test to 3000 lbs-good. Run in hole with wash nozzle assembly to tag @ 5676',
Wash down from 5676' to 5850'.
Wash up & wash down no circulation. Pull out of hole to surface. Disconnect & pick up head & lubricator, change out
tool assembly. Pick up & make up setting tool & CIBP assembly Max OD 2.19".
Make up head & lubricator & pressure test to 3000 lbs-good. Run in hole with 2.19" CIBP to setting depth. Correlate with
tie in logs 10' change, drop ball & pump till pressure up to 3800 psi, set plug @ 5728'. Pull out of hole with setting tool &
rig down tools. Lay down head & lubricator, shut in & secure well
09/03/2023 - Sunday
09/15/2023- Friday
PJSM, Discuss clean out operations & running logging tools on coil. Crew travel to location, check wellhead pressures
shut in tubing pressure- 300. Pick up & make coil head & lubricator, pressure test lubricator & head 250 psi low, 3000 psi
high-good test. Run in hole with slim hole clean out assembly @ 100'/min, tag @ 5417'. Establish circulation, work down
with coil string from 5417' to 5900, circulating wellbore clean as needed.
Go on total losses @ 5545' to 5900', no returns to surface after 5545'
Work string from 5900' to 5400'. Pull out of hole with clean out assembly. Pick up head & lubricator, lay down slim hole
assembly, rehead for logging tool. Make up HES logging assembly ccl/gamma. Make up head & lubricator back up to
stack & run in hole to 5800' logging as per HES engineer, Flag @ 5534' & 5728'. Pull out of hole with HES (ccl/gamma) as
per HES engineer Log up 700' @ 50 ft/min. Stop string for 5 min. Lay down tool string assembly. Break off coil head &
lubricator. Rig down head & lubricator, shut in & secure well.
PJSM and PTW, Simops with production.
RD from H pad, Mobilize equipment to Ivan River
Well shut in and pressured up with 750psi of gas. RU AK E-line.
M/U weight bars and 1-11/16"OD GPT.
Stab on well and pressure test lubricator to 250psi/2750psi - TEST GOOD. Weight indicator not reading, troubleshoot.
Ended up finding a bad wire and rewiring the weight indicator. RIH with GPT. Fluid level at 1,700ft with 780psi on the
tubing (top open perf 5,544' ST-A3). RIH and sit down at 5404' (100ft high to perf)
POOH, Secure well. R/D AK E-line.
09/14/2023 - Thursday
PJSM, Discuss daily operations & permits. Crew travel to location. Mob equipment from LRU C-02 to IRU 041-01, Spot in
equipment & rig up. Pressure test B.O.P.E. 250 psi low, 3000 psi high-good, perform accumulator draw down test-good,
shut in & secure well
Rig Start Date End Date
8/3/23 9/23/23
Daily Operations:
Hilcorp Alaska, LLC
Well Operations Summary
API Number Well Permit NumberWell Name
IRU 41-01 50-283-20088-00-00 192-109
PJSM, Discuss rig down & rig up operations. Crew travel to location. Rig down on LRU C-02 & move to IRU 041-01. Spot
in & rig up equipment. Rehead line. Pressure test Lubricator to 250 low/2750 high psi-good. Run in hole with GR/CCL
send into town for confirmation
Pull out of the hole & secure well.
09/17/2023 - Sunday
PJSM, Discuss well work coil tubing & cement operations. Travel to location from base camp. Make up head to
lubricator, Pick up setting tool & CICR 2.19", Make up to Bop & pressure test to 3000 psi-good. Run in hole to setting
depth 5534'. Perform injection test 1 BPM @ 950 psi. Prepare to set CICR @ 5534', Drop ball pump @ 3 bbls pressure
increase to 3000 psi, lost 5 k string weight (plug set prematurely), stack out on plug while pumping pressure lock up @
4000 psi, wait to see if bleeds off (pressure stable), Bleed off pressure thru choke, Unsting from CICR & roll hole with 550
psi, sting back into retainer & pressure increase to 2000 psi kick out pump, Bleed off string. Pressure up on annulus 1500
psi pressure held, unsting from CIBP circulate till ball is thru tubing spool & falling. Pull out of hole to inspect BHA.
Inspect BHA & setting tools ball seated in shear assembly-all in working condition. Check high pressure screen-clear & in
working condition. Make up setting tool on coil, Make up lubricator & coil head to lubricator to BOPE pressure test to
3000 psi-good, Run in hole to sting into CICR @ 5534' sting in put 12k down. Perform injection test, Kick in pump @ .5
bbl/min with 225 psi for 30 bbls, Increase pump speed to 1 bbl/min with 1300 psi for 10 bbls, Shut down pump watch
pressure bleed off to 0. No returns at surface, pressure test annulus to 2000 psi-good no leaks. Prepare cement. Spot in
& rig up Fox Cement Unit pressure test lines, Mix 11 bbls 15.3 ppg, class G cement with 3 cups fiber & pump, displace
cement with 30 bbls water (final circulating pressure- 1200 psi, 640 psi increase 600 psi start 1240 psi final) sting out of
CICR, Circulate 2 bottoms up 30 bbls @ 2 bpm with 50 psi, no cement to surface. Pull out of hole with coil top off well
with water. Lay down head & lubricator, Shut in & secure well
09/18/2023 - Monday
PJSM, Discuss daily operations running coil in hole & unload well, rigging down equipment. Travel to location from
Office. Make up lubricator & head, pick up clean out head & make up to BOP, pressure test to 3000 psi-good. Run in hole
with 1.75" coil & tag @ 5534', no cement. Spot in & rig up N2 unit, pressure test lines to 2000 psi-good, start pumping
down hole @ 800 scf/min unloaded 47 bbls returned to surface. blow dry. Pull out of hole with 1.75" coil. Unseat head &
lubricator from BOPE. Cradle head. Pressure up to 1500 psi on the 2-7/8" string. Shut in & secure well. Rig down coil
tubing & spot off location
09/21/2023 - Thursday
Rig Start Date End Date
8/3/23 9/23/23
Daily Operations:
Hilcorp Alaska, LLC
Well Operations Summary
API Number Well Permit NumberWell Name
IRU 41-01 50-283-20088-00-00 192-109
09/22/2023- Friday
PJSM, Discuss daily wireline operations. Crew travel to location. Pick up lubricator & pressure test to 250 low/ 2750 high-
good, make up 2' x 2" gun with 3 shots loaded with CCL/GR.
Run in hole & correlate, Adjust 1' & get confirmation-good. Get on depth CCL to TS-19', CCL @ 5479' + 19', TS @ 5498'
Shoot 3 x shots (2' x 2" @ 6.5 grams, 6 spf/60 degree, 22.30" penetration)
Monitor Pressure, starting psi-1400, psi @ 5 min 1400, psi @ 10 min 1375, psi @ 15 min 1375
Pull out of hole
Lay down gun all shots fired & end cap dry. Pick up & make up 11' gun 7' loaded (2" @ 6.5", 6 spf, 60 deg., 22.30" pen,
total shots x 42) CCL to TS=11'
Correlate with log, CCL depth @ 5483' to shoot perfs f/ 5494' to 5501'
Monitor Pressure, starting psi-1375, psi @ 5 min 1350, psi @ 10 min 1350, psi @ 15 min 1350
Pull out of hole
Lay down gun all shots fired & end cap dry. Bleed casing down to 800 psi & monitor for pressure build up build up to 830
psi.
Discuss with town, Decsion made to bleed down to 500 psi & perform GPT/ CCL log. PIck up & make up GPT/CCL logging
tools, Run in hole & perform log GPT log failed Pull out of hole & swap tools. Attempt to log with GPT tool failed. Rig
down wireline. Shut in & secure well
09/23/2023 - Saturday
PJSM, Discuss daily operations logging & perfing. Crew travel to location
Start & warm up equipment
Check wellhead pressure sicp-739 psi. Trouble shoot GPT tools. PIck up & make up lubricator,
Run in hole with GPT/CCL/GAMMA
Fluid level 2340'. Trouble shoot generator on wireline unit, Change faulty fuse, Test -good. PIck up 3' x 2" barrel loaded
with 4 x 2" shots ( 2", 6.5 grams, 22.5" pen, 60 deg., 1 spf) CCL-to T.S.-9.5'
Run in hole & correlate on depth-good
CCL @ 5440.5' Perfs @ 5450'-5452'
Start psi-641 psi, psi @ 5 min 655, psi @ 10 min 683, psi @ 15 min 710
Pull out of hole & check guns all fired. PIck up 11' x 2" barrel loaded with 8' of shots (2", 6.5 grams, 22.5" pen, 60 deg., 6
spf total shots-48) CCL-to T.S.- 10.5'
Run in hole & correlate on depth-good
CCL @ 5435.5' Perfs @ 5446'-5454'
Start psi-1020 psi, psi @ 5 min 1024, psi @ 10 min 1036, psi @ 15 min 1045
Pull out of hole & check guns all fired. Lay down lubricator & secure well. Final psi 1059
_______________ __________________________________________________
Updated by DMA 10-18-23
SCHEMATIC
Ivan River Unit
IRU 41-01
Completion Ran 8/10/11
PTD: 192-109
API: 50-283-20088-00-00
TD =9,170 PBTD = 8,597
Sterling /
Beluga
RT-THF:24 KB
7 @ 9,152
ST B1U
13
17
18
20
16
19
11
3
4
6
RKB: 51 AMSL
13-3/8
@ 895
9-5/8 @
3,498
20 @
165
1
12
8
9
10
2
Tyonek
ST A3
7
5
ST X2-A1
Tagged fill @
8,851(7/22/09)
CBL Top:5,000
R
RA
Fill cleanout to
5800(8-4-23)
CASING DETAIL
Size Type Wt/ Grade Top Btm CONN / ID Cement / Other
20Conductor 94# Surface 165Driven
13-3/8Surface 68#, K-55 Surface 895 Butt / 12.415212 bbl / Cmt to Surface
9-5/8Intermediate 47#, N-80 Surface 144 Butt / 8.681281 bbl / Cmt to Surface47#, S-95 144 3,498 Butt / 8.681
7Production 29#, N-80 Surface 9,152 Butt / 6.184 171 bbl / Cmt to 5,000
Tubing Detail
2-7/8Production 6.4#, L-80 Surface 5,955 IBT-Mod/2.441
1-1/2Heater 2.75#, J-55 Surface 2,99410RD Fluid: Propelyne Glycol
JEWELRY DETAIL
No. Depth Length ID OD Item
1 24.20 0.55 2.441 12.00
Dual Tubing Hanger, 2-7/8 x 2-3/8 12 5M National
(2-7/8 & 2-3/8 8RD lift threads)
2 5,327 4.03 2.310 3.920Sliding Sleeve, Halliburton XD
3 5,374 8.38 2.870 5.980Premier Packer
4 5,428 1.30 2.313 3.220 Baker X Profile (2.313 Min ID)
5 5,534Cement Retainer (9/17/23)
6 5,595 1.41 2.257 2.880Mechanical-release
7 5,728CIBP (9/16/23)
8 5,916 0.70 2.441 3.958Ported Sub
9 5,955 0.94 3.670 4.950WLEG
10 +/-8,530 32.77- - Dropped TCP Assembly
11 8,597 2.00- -Cement Retainer capped w/ 269 cement (Est)
12 8,613-2.441 3.500Cut tubing stub
13 8,629 4.78 3.250 5.968
Baker 3H Packer w/ mill out extension (Min ID thru
Anchor Latch Seal Assembly)
16 8,643 0.67 2.441 3.500 Baker RA Sub
17 8,650 1.24 2.2503.500" Baker R Profile w/ No-go
18 8,659 0.63 2.441 3.687Baker Ported Sub w/ glass disc
19 8,693 0.82 2.441 3.687Tubing Tail
20 8,895 (est) 183 3.687FISH: Baker TCP Drop Off Guns
PERFORATION DETAIL
ZONE TOP (MD) BTM (MD) TOP (TVD) BTM (TVD) Ft Condition
Sterling X2 5,446 5,454 4,669 4,975 8Perfed 9/23/23 - Open
Sterling A1 5,494 5,501 5,010 5,017 7Perfed 9/22/23 - Open
ST-A3 5,544 5,551 5,054 5,0607 Perfed 9/9/22 Isolated
ST-B1U 5,671' 5,678' 5,165' 5,172' 7 Perfed 2/4/21 Isolated
Sterling/
Beluga
5,977 5,9875,434' 5,443' 5 spf 4-5/8 TCP (11/2/11) 73-4 Sd
7,768' 7,796' 7,019' 7,044' 6 spf 2 HC, 60 deg phase (6/29/12) Iso
7,954 7,9747,186' 7,204' 6 spf 2 HC, 60 deg phase (6/28/12) Iso
Tyonek
8,710 8,7257,868' 7,882' 12 spf Perfed 1/26/93 Isolated
8,745 8,7687,900' 7,920' 12 spf Perfed 1/26/93 Isolated
8,783 8,8037,934' 7,952' 12 spf Perfed 1/26/93 Isolated
8,815 8,8757,963' 8,017' 12 spf Perfed 1/26/93 Isolated