Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout221-024FALSE Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: ____________________ Service Stratigraphic Test 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: 9. Ref Elevations: KB: 17. Field / Pool(s): GL:100.8 BF: Total Depth: 4750' FSL, 3754' FWL S36 T10N R1E UM 10.Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y- Zone- 4 TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y- Zone- 4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 N/A (ft MSL) 22. Logs Obtained: 23. BOTTOM 20" H-40 120 10 yrds 13.375" L-80 3056' 7.625' L-80 8304' Openhole 8176' 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MCF: Test Period Casing Press: Calculated Gas-MCF: Oil Gravity - API (corr): Press. 24-Hour Rate 39.8 AMOUNT PULLED 16" 42" BOTTOM 39.8 None SIZE DEPTH SET (MD) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ConocoPhillips Alaska, Inc. WAG Gas 11/22/2023 221-024/323-628 50-103-20830-00-00 285637 GMTU MT7-03 AA081800, AA081781, AA081803 996' FSL, 1912' FWL, S32 T10N R2E UM 932525000, 932516000. 932538000 6/6/2021 21050'MD/8176'TVD 11469'MD/8262' P.O. Box 100360, Anchorage, AK 99510-0360 5915818 CASING WT. PER FT. 289990 Top of Productive Interval: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, 7/11/2021 978'MD/977'TVD SETTING DEPTH TVD TOP N/A 68 120' 39.9 281519 TOP SETTING DEPTH MD 39.8 39.8 5911527 5919812 94 CASING, LINER AND CEMENTING RECORD 12376' 21050' GRADE PRODUCTION TEST HOLE SIZE ACID, FRACTURE, CEMENT SQUEEZE, ETC. If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): Lead: 483 bbls of 11ppg DeepCRETE Tail: 72bbls of 15.8ppg Class G 175bbls 11.0ppg cement CEMENTING RECORD Injector - Plugged Back Date of Test: Oil-Bbl: Per 20 AAC 25.283 (i)(2) attach electronic information 8405' PACKER SET (MD/TVD) TUBING RECORD 6.5" Flow Tubing Gas-Oil Ratio:Choke Size: 11469-12492' 43bbls of 16.5ppg Class G Plug Water-Bbl: 1865' FSL, 2828' FWL, S6 T9N R2E UM Sr Res EngSr Pet GeoSr Pet Eng Greater Mooses Tooth/Rendevous Pool None Oil-Bbl: Water-Bbl: 29.7 37.1 11624' 37.1 11" 112.3bbls of 15.8 Class G Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment 3553' By Grace Christianson at 8:21 am, Jan 04, 2024 Abandoned 11/24/2023 JSB RBDMS JSB 011024 x xG DSR-1/29/24 11/24/2023 Conventional Core(s): Yes No Sidewall Cores: N/A 30. MD TVD Surface Surface 978 977 C40 1407 1400 1667 1649 2045 1993 3439 3003 4354 3616 4633 3807 HRZ 9937 7459 N/A 10027 7521 LCU/Miluveach 10203 7640 Top of Productive Interval (Alpine C):11768 8337' Formation at total depth (Alpine C):21050 8176 31. List of Attachments: Cement Report, Directional Survey, Well Schematic, Operations Summary 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Joe Longo Contact Email:joseph.j.longo@conocophillips.com Authorized Contact Phone:907-947-4323 General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: Albian 96 The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. TPI (Top of Producing Interval). Authorized Title: Signature w/Date: Joe Longo Drilling Engineer Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment, whichever occurs first. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. C30 Albian 97 Kalubik C10 K-3 INSTRUCTIONS Authorized Name: If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. Yes No Well tested? Yes No 28. CORE DATA If yes, list intervals and formations tested, briefly summarizing test results. Attach separate pages to this form, if needed, and submit detailed test information, including reports, per 20 AAC 25.071. NAME Permafrost - Top Permafrost - Base 29. GEOLOGIC MARKERS (List all formations and markers encountered): FORMATION TESTS Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment  Dr i l l P i p e 4" X T 3 9 1 4 p p f S 1 3 5 CM T S t i n g e r 3- 1 / 2 " 8 R D E U E 9 . 3 p p f L 8 0 16 . 5 p p g C l a s s G KI C K O F F P L U G In t e r m e d i a t e I C a s i n g 7- 5 / 8 " 2 9 . 7 # L 8 0 H 5 6 3 x 7- 5 / 8 " 3 3 . 7 # L 8 0 T X P M 11 6 2 4 ' M D / 8 3 0 4 ' T V D Su r f a c e C a s i n g 13 - 3 / 8 " 6 8 # L 8 0 H 5 6 3 35 5 3 ' M D / 3 0 7 6 ' T V D Ce m e n t e d t o S u r f a c e Le a d : 1 1 . 0 p p g D e e p C R E T E | T a i l : 1 5 . 8 p p g C l a s s G 12 0 0 ' 15 5 ' 8 6 8 ' TD 6 - ½ ” P r o d u c t i o n S e c t i o n 21 0 5 0 ' M D / 8 1 7 6 ' T V D MT 7 - 0 3 Ri g W o r k o v e r - S i n g l e L a t e r a l I n j e c t o r FI N A L – C E M E N T K O P RK B = 1 4 0 . 7 ’ A M S L JJ L O N G O - 1 2 / 1 1 / 2 0 2 3 Co n f o r m a n c e Z o n e - 1 3 8 3 0 ' M D 16 . 5 p p g G e l P i l l Ki c k o f f P l u g T O C 16 . 5 p p g C l a s s G TO C - 1 1 4 6 9 ' M D LC M Ki c k o f f P l u g - B a s e 16 . 5 p p g C l a s s G 12 4 9 2 ' M D Page 1/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/10/2023 00:00 11/11/2023 00:00 24.00 MIRU, MOVE MOB T Phase 3 condition. Wait on weather 0.0 0.0 11/11/2023 00:00 11/12/2023 00:00 24.00 MIRU, MOVE MOB T Phase 3 condition. Wait on weather 0.0 0.0 11/12/2023 00:00 11/12/2023 06:30 6.50 MIRU, MOVE MOB P Prep pad around MT7-03. Spot matting boards.Un hook interconnects. BD steam lines. Move ball mill. 0.0 0.0 11/12/2023 06:30 11/12/2023 14:00 7.50 MIRU, MOVE MOB P Lower cattle chute. Skid rig floor. LD derrick. Stomp modules back and ose trucks to pull down well row. 0.0 0.0 11/12/2023 14:00 11/13/2023 00:00 10.00 MIRU, MOVE MOB P Stomp out sub. Hook up jeep. Pull sub to MT7-03 and spot on rig mats. Stomp sub into position over MT7-03. 0.0 0.0 11/13/2023 00:00 11/13/2023 06:30 6.50 MIRU, MOVE MOB P Turn pipeshed. Spot in place.Pin pipe shed. Lay mats for csg shed. Spot csg shed. Spot pit module. Connect interconnects. 0.0 0.0 11/13/2023 06:30 11/13/2023 12:00 5.50 MIRU, MOVE MOB P Stomp pump module and motor module into place. Raise derrick. Skid rig floor. Spot ball mill. Hook up modules. Energize steam. 0.0 0.0 11/13/2023 12:00 11/13/2023 17:30 5.50 MIRU, MOVE MOB P Change out cable on cattle chute. Raise cattle chute. Raise chutes in pipe shed. Spool on drill line. Scope up derrick. 0.0 0.0 11/13/2023 17:30 11/13/2023 21:00 3.50 MIRU, MOVE MOB P Work on rig acceptance checklist. Test Gen/Hiline sync. Troubleshoot Amphion alarms. Test gas alarms. Accept rig @ 21:00hrs 11/13/23 0.0 0.0 11/13/2023 21:00 11/14/2023 00:00 3.00 MIRU, WELCTL RURD P Build hooch around cellar. Take on fluid to pis. C/O saver sub. Install belt guard on mud pump. 0.0 0.0 11/14/2023 00:00 11/14/2023 05:00 5.00 MIRU, WELCTL RURD P Change out saver sub.Install bails/clamps. Take on 8.8ppg VisBrine. MU squeeze manifold in celllar. line up to Frac tank. Initial pressures: IA - 640psi TBG - 640psi OA - 0psi 0.0 0.0 11/14/2023 05:00 11/14/2023 07:00 2.00 MIRU, WELCTL OWFF P Open IA to frac tank. Bleed off 100bbls (diesel) to frac tank. Final pressure 750psi. Line up TBG to frac tank. Bled from 720psi to 640psi. 0.0 0.0 11/14/2023 07:00 11/14/2023 10:00 3.00 MIRU, WELCTL CIRC P Line up and pump 275bbls 8.8ppg Vis Brine down TBG. Stage up to 6 BPM. Initial pressure: IA-1015psi/TBG-630psi Final pressure: IA-1620pis/TBG-365psi 0.0 0.0 11/14/2023 10:00 11/14/2023 12:00 2.00 MIRU, WELCTL CIRC P Line up and pump 325bbls 8.8ppg Vis Brine down IA. Stage up to 4 BPM. Initial pressure:IA-1160psi/TBG-vac. Final pressure: IA 620psi/TBG-220psi. 0.0 0.0 11/14/2023 12:00 11/14/2023 12:30 0.50 MIRU, WELCTL RURD P Flowcheck tubing and IA. Both on vac. Install BPV. 0.0 0.0 11/14/2023 12:30 11/14/2023 13:00 0.50 MIRU, WELCTL PRTS P Perform rolling test on BPV. 4 BPM final circulating pressure 550psi. No leaks observed. 0.0 0.0 11/14/2023 13:00 11/14/2023 15:00 2.00 COMPZN, WHDBOP NUND P ND tree and tbg head adapter, Install blanking plug in tbg hanger. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 2/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/14/2023 15:00 11/14/2023 22:00 7.00 COMPZN, WHDBOP NUND P NU BOPE and MPD equipment. 0.0 0.0 11/14/2023 22:00 11/15/2023 00:00 2.00 COMPZN, WHDBOP RURD P Install trip nipple. MU blank plug and XO. Perform BOP break in procedure. 0.0 0.0 11/15/2023 00:00 11/15/2023 02:00 2.00 COMPZN, WHDBOP RURD P Pull test joint. Remove master bushings. Seal up flow box. 0.0 0.0 11/15/2023 02:00 11/15/2023 02:45 0.75 COMPZN, WHDBOP RURD P MU BPA. Stage spooler to rig floor. Hook up super sucker and retrieve flashlight in BOPE stack. 0.0 0.0 11/15/2023 02:45 11/15/2023 04:45 2.00 COMPZN, WHDBOP BOPE P Attempt shell test. Observed leak. CO ring gasket in choke line. Shell test. Good. 0.0 0.0 11/15/2023 04:45 11/15/2023 06:00 1.25 COMPZN, WHDBOP BOPE P Testing BOPE. 0.0 0.0 11/15/2023 06:00 11/15/2023 14:45 8.75 COMPZN, WHDBOP BOPE T Test BOPE all test T/ 250 low for 5 min and 5,000 high for 10 min charted. W/ exception of annular T/ 250 low for 5 min and 3,500 high for 10 min. Manual operated & super choke tested T/2,000 psi charted, Test w/ 3 1/2" and 4 1/2" test joint.Test choke valves 1-15, manual operated & super choke, Choke & kill manuals, HCR's, 4" valves on kill line, 4" FOSV, 4" Dart valve, Upper and lower IBOP on TD; Blind/shear rams; Perform KOOMEY drawdown, ACC = 3000 PSI. MANIF. = 1500 PSI. ACC = 1800 PSI After all functions on bottles, 15 sec for 200 psi. Build W/ 2 Elec. pumps, 97 sec T/ Build full system. Pressure W/ 2 Elec. & 2 Air pumps, Closing times, Annular = 26 sec. UPR = 14 sec. Blind / Shears = 6 sec. LPR = 5 sec. Choke HCR = 2 sec. Kill HCR = 2 sec; Test PVT G/L and flow out alarms, Test LEL and H2S alarms. Witnessed by AOGCC Cam St John. BLM waived witness per Quinn Sawyer. 0.0 0.0 11/15/2023 14:45 11/15/2023 17:00 2.25 COMPZN, WHDBOP MPDA P RU and test MPD. 200psi low/1800psi high f/ 5/10min ea. Good test. 0.0 0.0 11/15/2023 17:00 11/15/2023 18:00 1.00 COMPZN, WHDBOP RURD P BD choke manifold/Kill line. PU 4.5" handling equipment, XO's. 0.0 0.0 11/15/2023 18:00 11/15/2023 19:30 1.50 COMPZN, WHDBOP OWFF P RU T-Bar. Check for flow below BPV. Flow observed. Decision made to Kill well pumping down tbg. 0.0 0.0 11/15/2023 19:30 11/15/2023 23:00 3.50 COMPZN, WHDBOP CIRC P Line up and pump down tbg @ 75 GPM. ICP-930psi/FCP 140psi. 4480stks 380bbls pumped. 0.0 0.0 11/15/2023 23:00 11/16/2023 00:00 1.00 COMPZN, WHDBOP OTHR P Drain BOPE stack w/ Super Sucker vac truck. 0.0 0.0 11/16/2023 00:00 11/16/2023 02:00 2.00 COMPZN, WHDBOP OWFF P Drain stack with Vac truck. Check for pressure below BPV. Observed flow. 0.0 0.0 11/16/2023 02:00 11/16/2023 05:30 3.50 COMPZN, WHDBOP OTHR P Discuss plan forward with office. 0.0 0.0 11/16/2023 05:30 11/16/2023 08:30 3.00 COMPZN, WHDBOP OTHR P Pump down tbg to kill well. Stage rate to 4 BPM. 7100stks 600bbls ICPs: TBG:615psi IA 235psi FCP: TBG: 615psi IA: 165psi 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 3/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/16/2023 08:30 11/16/2023 10:30 2.00 COMPZN, WHDBOP OTHR P Check for pressure below BPV.No pressure. Retrieve BPV. Monitor well. Loss rate at 90 BPH. 0.0 0.0 11/16/2023 10:30 11/16/2023 13:00 2.50 COMPZN, WHDBOP OTHR P Pump down IA and tbg. 1/2 BPM down tbg and 4 BPM down IA. 450 bbls. ICP: IA: 340psi FCP: IA: 930psi. 0.0 0.0 11/16/2023 13:00 11/16/2023 15:30 2.50 COMPZN, RPCOMP PULD P Back out lockdown screws. Pull tbg hanger to rig floor. 216k. LD landing joint,XOs and hanger. 0.0 0.0 11/16/2023 15:30 11/17/2023 00:00 8.50 COMPZN, RPCOMP PULD P POOH LD 4 1/2" tbg f/ 12376' to 7779'. 12,376.0 7,779.0 11/17/2023 00:00 11/17/2023 13:00 13.00 COMPZN, RPCOMP PULD P POOH LD 4 1/2" tbg f/ 7779' to surface. 7,779.0 0.0 11/17/2023 13:00 11/17/2023 14:30 1.50 COMPZN, WELLPR RURD P RD handling equipment. TEC spool. Clean and clear rig floor. 0.0 0.0 11/17/2023 14:30 11/17/2023 15:30 1.00 COMPZN, WELLPR RURD P Stage BHA to rig floor. RU 4" handling equipment. 0.0 0.0 11/17/2023 15:30 11/17/2023 16:15 0.75 COMPZN, WELLPR RURD P Install wear bushing. 0.0 0.0 11/17/2023 16:15 11/17/2023 16:45 0.50 COMPZN, WELLPR BHAH P PJSM. PU BHA 0.0 0.0 11/17/2023 16:45 11/17/2023 17:15 0.50 COMPZN, WELLPR SVRG P Service rig. Adjust link tilts. 0.0 0.0 11/17/2023 17:15 11/17/2023 19:00 1.75 COMPZN, WELLPR BHAH P PU and RIH w/ BHA to 291'. 0.0 291.0 11/17/2023 19:00 11/17/2023 23:00 4.00 COMPZN, WELLPR PULD P RIH w/ 6 1/2" BHA singling in w/ 4" DP f/ 291' to 2345'. 291.0 2,345.0 11/17/2023 23:00 11/18/2023 00:00 1.00 COMPZN, WELLPR CIRC P Shallow test MWD. Good test. 2,345.0 2,345.0 11/18/2023 00:00 11/18/2023 13:15 13.25 COMPZN, WELLPR PULD P RIH w/ 6 1/2" BHA singling in w/ 4" DP f/ 2345' to 11615'. SimOps: Test MPD lines. 2,345.0 11,202.0 11/18/2023 13:15 11/18/2023 14:30 1.25 COMPZN, WELLPR SLPC P Slip/Cut drill line. 11,202.0 11,202.0 11/18/2023 14:30 11/18/2023 15:00 0.50 COMPZN, WELLPR SVRG P Service Top Drive. 11,202.0 11,615.0 11/18/2023 15:00 11/18/2023 16:00 1.00 COMPZN, WELLPR MPDA P Retrieve trip nipple and install RCD bearing assembly. 11,615.0 11,615.0 11/18/2023 16:00 11/18/2023 16:45 0.75 COMPZN, WELLPR CIRC P Break circulation. Stage up pumps to 220 GPM/830 PSI. 40 RPM/10k TQ. 255k PU 125 SO 183k ROT 11,615.0 11,615.0 11/18/2023 16:45 11/18/2023 17:00 0.25 COMPZN, WELLPR PULD P RIH w/ 6 1/2" BHA singling in w/ 4" DP f/ 11615' to 11678'. Set down 25k @ 11678'. 11,615.0 11,678.0 11/18/2023 17:00 11/18/2023 19:00 2.00 COMPZN, WELLPR WASH P Wash down f/ 11678' to 12032'. 175 GPM 600PSI 11,678.0 12,032.0 11/18/2023 19:00 11/18/2023 21:00 2.00 COMPZN, WELLPR PULD P RIH w/ 6 1/2" BHA singling in w/ 4" DP f/ 12032' to 13171'. Obstruction encountered @ 13161'. 12,032.0 13,171.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 4/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/18/2023 21:00 11/18/2023 23:00 2.00 COMPZN, WELLPR REAM P Wash/Ream f/ 13171' to 13252'. 175 GPM 700 PSi 40 RPM 12k TQ 4-10k WOB Observed PSI spike and hi TQ. Decide to circulate BU. 13,171.0 13,251.0 11/18/2023 23:00 11/19/2023 00:00 1.00 COMPZN, WELLPR CIRC P Reciprocate string while CBU. 200 GPM 810 PSI 40 RPM 12k TQ 13,251.0 13,251.0 11/19/2023 00:00 11/19/2023 01:00 1.00 COMPZN, WELLPR CIRC P Reciprocate string while CBU. 200 GPM 810 PSI 40 RPM 12k TQ 13,251.0 13,251.0 11/19/2023 01:00 11/19/2023 05:00 4.00 COMPZN, WELLPR REAM P Wash/Ream f/ 13251' to 13350'. 200 GPM 800 PSi 40 RPM 14k TQ 185k ROT 13,251.0 13,350.0 11/19/2023 05:00 11/19/2023 07:30 2.50 COMPZN, WELLPR BKRM P Pack off @ 13350'. Work pipe. Re- establish circulation. Stage pumps back to 200 GPM. Unable to BROOH continuing to packoff. 13,350.0 13,350.0 11/19/2023 07:30 11/19/2023 10:00 2.50 COMPZN, WELLPR BKRM P Reduce pump rate to 84 GPM/300 PSI. BROOH to 13065'. Attempt to pull on elevators. Observed 30k OP. 13,350.0 13,065.0 11/19/2023 10:00 11/19/2023 13:00 3.00 COMPZN, WELLPR BKRM P BROOH f/ 13065' to 12573'. 13,065.0 12,573.0 11/19/2023 13:00 11/19/2023 14:30 1.50 COMPZN, WELLPR SMPD P SOOH f/ 12573' to 11615'. 12,573.0 11,615.0 11/19/2023 14:30 11/19/2023 15:15 0.75 COMPZN, WELLPR RURD P RU cementing line pump in assembly. 12,573.0 11,615.0 11/19/2023 15:15 11/19/2023 16:30 1.25 COMPZN, WELLPR CIRC P CBU. 220 GPM. 870 PSI. 12,573.0 11,615.0 11/19/2023 16:30 11/19/2023 17:00 0.50 COMPZN, WELLPR CIRC P Establish injection rates @ 2/3/4 BPM. 2BPM - 430psi SPP/182psi ANN 3BPM - 550psi SPP/210psi ANN 4BPM - 720psi SPP/260psi ANN 11,615.0 11,615.0 11/19/2023 17:00 11/19/2023 20:00 3.00 COMPZN, WELLPR CIRC P PJSM. Test lines to 4000psi. Pump 35bbls 11.0ppg spacer + 110bbls 14.5ppg Thixotropic cement + 60bbls 14.0ppg Thixotropic cement + 20bbls 11.0ppg spacer and 20bbls FW. Closed chokes as spacer exited bit and bull head to loss zone. Swap over to rig pumps and displace/bullhead 119bbls of 8.8ppg Vis Brine. 3 BPM FCP 1000psi on IA/614psi SPP 11,615.0 11,615.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 5/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/19/2023 20:00 11/19/2023 21:15 1.25 COMPZN, WELLPR SQEZ P SD f/ 5 minutes Squeeze 10bbls @ 1BPM - SPP 520psi/IA 380psi SD f/ 10 minutes. Squeeze 10bbls @ 1 BPM - SPP 375psi/IA 230psi SD f/ 10 minutes. Squeeze 10bbls @ 1 BPM - SPP 195psi/IA 4psi. SD f/ 10 minutes. Cement in place @ 21:15hrs 11/19/23 11,615.0 11,615.0 11/19/2023 21:15 11/19/2023 21:45 0.50 COMPZN, WELLPR SMPD P SOOH 5 stds to 11170'. 11,615.0 11,170.0 11/19/2023 21:45 11/20/2023 00:00 2.25 COMPZN, WELLPR CIRC P Stage up rates to 5 BPM. Check tools. All good. Pump 40bbl sugar water pill + 30 bbl HiVis pill. Chase pills w/ DS volume. loss rate: 2 BPM 35 BPH 4 BPM 75 BPH. 11,170.0 11,170.0 11/20/2023 00:00 11/20/2023 06:00 6.00 COMPZN, WELLPR WOC P Waiting on cement. Circulate across top of hole. Losses 25-30 BPH. SimOPs: Adjust link tilt. Grease crown and blocks. Troubleshoot electrical issue from rig maintenance. 11,170.0 11,170.0 11/20/2023 06:00 11/20/2023 09:00 3.00 COMPZN, WELLPR WOC P Waiting on cement. Break circulation and stage up to 200 GPM. Tools all working. Static losses 25-30 BPH. 11,170.0 11,170.0 11/20/2023 09:00 11/20/2023 10:00 1.00 COMPZN, WELLPR SMPD P Strip in hole to 11645'. 11,170.0 11,645.0 11/20/2023 10:00 11/20/2023 13:30 3.50 COMPZN, WELLPR RGRP T Troubleshoot VFD Chopper Issues. 11,645.0 11,645.0 11/20/2023 13:30 11/20/2023 15:45 2.25 COMPZN, WELLPR REAM P Ream in hole f/ 11645' to 12212'. 48 GPM 310 PSI 20 RPM 13k TQ 11,645.0 12,212.0 11/20/2023 15:45 11/20/2023 17:00 1.25 COMPZN, WELLPR CIRC P Circulate BU 200 GPM 840 PSI 40 RPM 14k TQ 12,212.0 12,212.0 11/20/2023 17:00 11/20/2023 21:30 4.50 COMPZN, WELLPR CIRC P Circulate 84 GPM 260 PSI 20 RPM 16k TQ 12,212.0 12,212.0 11/20/2023 21:30 11/21/2023 00:00 2.50 COMPZN, WELLPR CIRC T Take baseline parameters for opening well commander. Drop 1.75" openng ball. Pump down @ 2 BPM. No indications of ball landing in seat after pumping 50bbls over calculated strokes. Continue pumping. Work drill pipe. Vary RPMs. No indications ball seated. 12,212.0 12,212.0 11/21/2023 00:00 11/21/2023 01:30 1.50 COMPZN, WELLPR CIRC T Continue Adjusting parameters to shift well commander open. No success. Ream back down to 12212' 12,212.0 12,212.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 6/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/21/2023 01:30 11/21/2023 03:00 1.50 COMPZN, WELLPR CIRC P Pump 10 bbls spacer + 20 bbls 16.5ppg Gel pill + 10 bbls spacer. Displace with 130bbls 8.8 Vis Brine. Close chokes and bullhead into OH. Final circulating pressure SPP 1177 psi/IA 675 psi. 12,212.0 12,212.0 11/21/2023 03:00 11/21/2023 04:15 1.25 COMPZN, WELLPR SMPD P SOOH to inside casing @ 11568'. 12,212.0 11,568.0 11/21/2023 04:15 11/21/2023 05:00 0.75 COMPZN, WELLPR MPDA P Flow check. Retrieve RCD bearing assembly and install trip nipple. 12,212.0 11,568.0 11/21/2023 05:00 11/21/2023 05:30 0.50 COMPZN, WELLPR OWFF P Establish static loss rate. 15 BPH 11,568.0 11,568.0 11/21/2023 05:30 11/21/2023 06:00 0.50 COMPZN, WELLPR CIRC P Pump slug and blow down top drive. 11,568.0 11,568.0 11/21/2023 06:00 11/21/2023 08:30 2.50 COMPZN, WELLPR TRIP P Drop 2.5" drift w/ tail. POOH f/ 11568' to 7196'. 11,568.0 7,196.0 11/21/2023 08:30 11/21/2023 09:00 0.50 COMPZN, WELLPR RURD P Found 2.50" drift tail in Std #73. LD singles and retrieved drift in top of Std #72. Observed residual cement in STD. MU singles and drop 2.14" drift w/ tail in string. 7,196.0 7,196.0 11/21/2023 09:00 11/21/2023 12:00 3.00 COMPZN, WELLPR P POOH f/ 7196' to 1945' 7,196.0 1,945.0 11/21/2023 12:00 11/21/2023 12:30 0.50 COMPZN, WELLPR OWFF P Establish static loss rate. 21 BPH 1,945.0 1,945.0 11/21/2023 12:30 11/21/2023 14:00 1.50 COMPZN, WELLPR TRIP P TOOH f/ 1945' to 200'. 1,945.0 200.0 11/21/2023 14:00 11/21/2023 14:15 0.25 COMPZN, WELLPR OWFF P Flow check. Slow loss. PJSM f/ BHA 200.0 200.0 11/21/2023 14:15 11/21/2023 15:30 1.25 COMPZN, WELLPR BHAH P LD BHA. 200.0 0.0 11/21/2023 15:30 11/21/2023 16:00 0.50 COMPZN, WELLPR CLEN P Clean and clear rig floor. Stage Tbg handling equipment. 0.0 0.0 11/21/2023 16:00 11/21/2023 17:00 1.00 COMPZN, WELLPR RURD P RU 3 1/2" Tbg handling equipment. 0.0 0.0 11/21/2023 17:00 11/21/2023 19:00 2.00 COMPZN, WELLPR PULD P PJSM. RIH w/ 3 1/2" cementing stinger. 0.0 1,230.0 11/21/2023 19:00 11/21/2023 19:45 0.75 COMPZN, WELLPR RURD P MU XO. RD tbg handling equipment. 1,230.0 1,230.0 11/21/2023 19:45 11/22/2023 00:00 4.25 COMPZN, WELLPR TRIP P RIH w/ 3 1/2" cement stinger on 4" DP f/ 1230' to 10219'. 1,230.0 10,219.0 11/22/2023 00:00 11/22/2023 00:45 0.75 COMPZN, WELLPR TRIP P RIH f/ 10219' to 11546'. 10,219.0 11,546.0 11/22/2023 00:45 11/22/2023 01:15 0.50 COMPZN, WELLPR RURD P Flow check. Retrieve trip nipple. Install RCD bearing assembly. 11,546.0 11,546.0 11/22/2023 01:15 11/22/2023 03:00 1.75 COMPZN, WELLPR CIRC P Establish loss rates @ 4 BPM. 24 BPH. Obtain baseline parameters @ 2BPM. 257k PU 145k SO 182k ROT 10.5k TQ @ 10 RPM 11.5k TQ @ 15 RPM 11.7k TQ @ 20 RPM 11,546.0 11,546.0 11/22/2023 03:00 11/22/2023 03:30 0.50 COMPZN, WELLPR TRIP P RIH f/ 11546' to 12205' 11,546.0 12,205.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 7/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/22/2023 03:30 11/22/2023 05:45 2.25 COMPZN, WELLPR REAM P Wash/Ream in hole f/ 12205' to 12405'. Observe taking weight @ 12405'. Work string and wash down to 12492'. 84 GPM 200 PSI 20 RPM 13/14k TQ 180k ROT 12,205.0 12,492.0 11/22/2023 05:45 11/22/2023 10:00 4.25 COMPZN, WELLPR CIRC P Stage pumps to 210 GPM and circulate 3 BU. Rotate and reciprocate pipe. 210 GPM 491 PSI 12,492.0 12,492.0 11/22/2023 10:00 11/22/2023 12:00 2.00 COMPZN, WELLPR CIRC P Establish injection rates. Pump 100bbl LCM pill + 10bbl spacer + 20bbls 16.5ppg Gel pill + 10bbls spacer. Chase w/ 116bbls 8.8ppg Vis Brine. Close chokes and bullhead as LCM pill exits bit. FCP: SPP - 750psi IA - 1060psi 12,492.0 12,492.0 11/22/2023 12:00 11/22/2023 13:30 1.50 COMPZN, WELLPR RURD P RU cementing assembly. PJSM. Circulate @ 1 BPM/55PSI. 12,492.0 12,492.0 11/22/2023 13:30 11/22/2023 15:00 1.50 COMPZN, WELLPR CMNT P Flood lines and test to 3800psi. Good test. Pump 30bbls 13.0ppg mudpush spacer + 43bbls 16.5ppg G cement + 11bbls 13.0ppg mud push spacer. Displace w/ 99 bbls 8.8ppg Vis Brine. 12,492.0 12,492.0 11/22/2023 15:00 11/22/2023 15:30 0.50 COMPZN, WELLPR RURD P RD cementing assembly and BD lines. 12,492.0 12,492.0 11/22/2023 15:30 11/22/2023 17:30 2.00 COMPZN, WELLPR BKRM P BROOH f/ 12492' to 11357'. Observed several overpulls. Worked through. 1/4 BPM 10 RPM 8k TQ 12,492.0 11,357.0 11/22/2023 17:30 11/22/2023 20:00 2.50 COMPZN, WELLPR CIRC P Load nerf ball in DS. Circulate BU x 2. Observed soft cement/Gel/LCM across shakers at 1/3 of first BU. Dumped a total of 387 bbls of contaminated returns. Established loss rate after circulating BU. 6 BPH. 168 GPM 600 PSI 20 RPM 10k TQ. 11,357.0 11,357.0 11/22/2023 20:00 11/22/2023 20:45 0.75 COMPZN, WELLPR MPDA P Retrieve RCD bearing assembly and install trip nipple. 11,357.0 11,357.0 11/22/2023 20:45 11/23/2023 00:00 3.25 COMPZN, WELLPR TRIP P POOH f/ 11357' to 6716'. 11,357.0 6,716.0 11/23/2023 00:00 11/23/2023 03:00 3.00 COMPZN, WELLPR TRIP P POOH f/ 6716' to 1230' 6,716.0 1,230.0 11/23/2023 03:00 11/23/2023 03:30 0.50 COMPZN, WELLPR RURD P Flow check. RU tbg handling equipment. 1,230.0 1,230.0 11/23/2023 03:30 11/23/2023 06:00 2.50 COMPZN, WELLPR PULD P POOH LD 3 1/2" tbg f/ 1230' to surface. 1,230.0 0.0 11/23/2023 06:00 11/23/2023 06:45 0.75 COMPZN, WELLPR RURD P RD tbg handling equipment. Clean and clear rig floor. 0.0 0.0 11/23/2023 06:45 11/23/2023 09:00 2.25 COMPZN, DRILLOUT BHAH P PJSM. MU and RIH w/ 6 1/2" kick off BHA. 0.0 318.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 8/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/23/2023 09:00 11/23/2023 11:00 2.00 COMPZN, DRILLOUT TRIP P RIH w/ 6 1/2" kick off BHA to 2633'. 318.0 2,633.0 11/23/2023 11:00 11/23/2023 11:30 0.50 COMPZN, DRILLOUT SVRG P Service Rig. 2,633.0 2,633.0 11/23/2023 11:30 11/23/2023 13:00 1.50 COMPZN, DRILLOUT RGRP T Change out switch on Top drive. 2,633.0 2,633.0 11/23/2023 13:00 11/23/2023 18:00 5.00 COMPZN, DRILLOUT TRIP P RIH w/ 6 1/2" kick off f/ 2633' to 11340'. 2,633.0 11,340.0 11/23/2023 18:00 11/23/2023 19:00 1.00 COMPZN, DRILLOUT SLPC P Slip/Cut drillline. 11,340.0 11,340.0 11/23/2023 19:00 11/23/2023 19:30 0.50 COMPZN, DRILLOUT SVRG P Service rig. 11,340.0 11,340.0 11/23/2023 19:30 11/23/2023 20:30 1.00 COMPZN, DRILLOUT WASH P Break circulation and wash down f/ 11340'. Set down 15k @ 11469'. 200 GPM 1550PSI 11,340.0 11,469.0 11/23/2023 20:30 11/23/2023 22:00 1.50 COMPZN, DRILLOUT REAM P Wash/Ream f/ 11469' to 11644'. (20' below shoe). 200 GPM 1550PSI XX RPM 14-15k TQ. 11,469.0 11,644.0 11/23/2023 22:00 11/24/2023 00:00 2.00 COMPZN, DRILLOUT CIRC P Circulate BU and back ream into shoe to 11626' 200 GPM 1480 PSI 60 RPM 13k TQ. 11,644.0 11,626.0 11/24/2023 00:00 11/24/2023 00:30 0.50 COMPZN, DRILLOUT CIRC T Circulate BU and back ream into shoe to 11626' 200 GPM 1480 PSI 60 RPM 13k TQ. 11,626.0 11,626.0 11/24/2023 00:30 11/24/2023 02:15 1.75 COMPZN, DRILLOUT FIT P RU and perform shoe test to 12.1ppg EMW. RD test equipment. 11,626.0 11,626.0 11/24/2023 02:15 11/24/2023 03:15 1.00 COMPZN, DRILLOUT REAM P Wash/Ream f/ 11626' to 11720'. 200 GPM 1550 PSI 60 RPM 13k TQ 182k ROT 11,626.0 11,720.0 11/24/2023 03:15 11/24/2023 09:00 5.75 COMPZN, DRILLOUT DRLG P Reciprocate and ream to build trough for side track. 11720' to 11682'. 200 GPM 1550 PSi 60-80 RPM 13k TQ 182k ROT 11,720.0 11,720.0 11/24/2023 09:00 11/24/2023 18:00 9.00 COMPZN, DRILLOUT DRLG P Time driill f/ 11720' to 11731'. 200 GPM 1550 PSI 80 RPM 13-14k TQ 188 ROT 11,720.0 11,731.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 9/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/24/2023 18:00 11/25/2023 00:00 6.00 COMPZN, DRILLOUT DRLG P Time driill f/ 11731' to 11758'. 200 GPM 1550 PSI 80 RPM 13-14k TQ 188 ROT 11,731.0 11,758.0 11/25/2023 00:00 11/25/2023 02:30 2.50 COMPZN, DRILLOUT DDRL P Time drill f/ 11758' to 11806'. 200 GPM 1530 PSI 80 RPM 13-14k TQ. 11,758.0 11,806.0 11/25/2023 02:30 11/25/2023 03:00 0.50 COMPZN, DRILLOUT CIRC P Take survey. Drift Sidetrack f/ 11720' to 11806'. Set down 15k to confirm new hole. 11,806.0 11,806.0 11/25/2023 03:00 11/25/2023 05:00 2.00 COMPZN, DRILLOUT CIRC P Pump out of hole to 11695'. BROOH f/ 11695' to 11622' while circulating BU. 200 GPM 1530 PSI 20 RPM 13-14k TQ 188k ROT 11,806.0 11,622.0 11/25/2023 05:00 11/25/2023 05:30 0.50 COMPZN, DRILLOUT OWFF P Flow check. Static. Pump slug. Blow down Top Drive. 11,622.0 11,622.0 11/25/2023 05:30 11/25/2023 11:45 6.25 COMPZN, DRILLOUT TRIP P POOH to BHA at 270'. 11,622.0 270.0 11/25/2023 11:45 11/25/2023 12:30 0.75 COMPZN, DRILLOUT OWFF P Flow check. Static. Pull PS-21s and install master bushings. 270.0 270.0 11/25/2023 12:30 11/25/2023 14:00 1.50 COMPZN, DRILLOUT BHAH P LD BHA. 270.0 0.0 11/25/2023 14:00 11/25/2023 15:00 1.00 COMPZN, DRILLOUT CIRC P Function rams and jet BOPE. 0.0 0.0 11/25/2023 15:00 11/25/2023 15:30 0.50 COMPZN, DRILLOUT CLEN P Clean and clear rig floor. 0.0 0.0 11/25/2023 15:30 11/26/2023 00:00 8.50 COMPZN, DRILLOUT BOPE P Test BOPE all test T/ 250 low for 5 min and 5,000 high for 10 min charted. W/ exception of annular T/ 250 low for 5 min and 2,500 high for 10 min w/ 4" test joint. Manual operated & super choke tested T/2,000 psi charted, Test w/ 4" and 4 1/2" test joint.Test choke valves 1- 15, manual operated & super choke, Choke & kill manuals, HCR's, 4" valves on kill line, 4" FOSV, 4" Dart valve, Upper and lower IBOP on TD; Blind/shear rams; Perform KOOMEY drawdown, ACC = 3000 PSI. MANIF. = 1500 PSI. ACC = 1800 PSI After all functions on bottles, 17 sec for 200 psi. Build W/ 2 Elec. pumps, 97 sec T/ Build full system. Pressure W/ 2 Elec. & 2 Air pumps, Closing times, Annular = 27 sec. UPR = 6 sec. Blind / Shears = 5 sec. LPR = 5 sec. Choke HCR = 2 sec. Kill HCR = 2 sec; Test PVT G/L and flow out alarms, Test LEL and H2S alarms. Witnessed by AOGCC Sean Sullivan . BLM waived witness per Quinn Sawyer. 0.0 0.0 11/26/2023 00:00 11/26/2023 01:00 1.00 COMPZN, DRILLOUT BOPE P Test LPRs and manual chokes. 250/5000 PSI 5min low/10min high. 0.0 0.0 11/26/2023 01:00 11/26/2023 02:00 1.00 COMPZN, DRILLOUT RURD P Pull test plug/RD test equipment. Install wear bushing and lock down. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 10/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/26/2023 02:00 11/26/2023 05:00 3.00 COMPZN, DRILLOUT BHAH P MU and RIH w/ 6 1/2" production BHA. 0.0 318.0 11/26/2023 05:00 11/26/2023 06:30 1.50 COMPZN, DRILLOUT TRIP P RIH f/ 318' to 790'. Rattling DP to remove cement. Decision made to POOH. 318.0 790.0 11/26/2023 06:30 11/26/2023 07:00 0.50 COMPZN, DRILLOUT TRIP T POOH to BHA. 790.0 318.0 11/26/2023 07:00 11/26/2023 08:30 1.50 COMPZN, DRILLOUT BHAH T Rack back majority of BHA. Remove source. 318.0 0.0 11/26/2023 08:30 11/26/2023 12:00 3.50 COMPZN, DRILLOUT TRIP T MU open ended 4" mule shoe and RIH w/ 4" DP to 6146'. Rattling each joint with hammer to dislodge cement. Observed cement coming out stds 1-13. 0.0 6,146.0 11/26/2023 12:00 11/26/2023 12:30 0.50 COMPZN, DRILLOUT SVRG T Service rig. (Power surge blacked out rig trounbleshoot). 6,146.0 6,146.0 11/26/2023 12:30 11/26/2023 13:00 0.50 COMPZN, DRILLOUT RGRP T Troubleshoot power surge that blacked out rig. 6,146.0 6,146.0 11/26/2023 13:00 11/26/2023 16:00 3.00 COMPZN, DRILLOUT TRIP T RIH w/ 4" DP f/ 6146' to 11542'. 6,146.0 11,542.0 11/26/2023 16:00 11/26/2023 17:30 1.50 COMPZN, DRILLOUT CIRC T Pump 50 bbl 8.8ppg BiCarb pill and circulate surface to surface to clean drill pipe. 500 GPM 1920 PSI 11,542.0 11,542.0 11/26/2023 17:30 11/26/2023 18:00 0.50 COMPZN, DRILLOUT OWFF T Flow check and blow down Top drive. 11,542.0 11,542.0 11/26/2023 18:00 11/27/2023 00:00 6.00 COMPZN, DRILLOUT TRIP T POOH f/ 11542' to 3200'. 11,542.0 3,200.0 11/27/2023 00:00 11/27/2023 00:30 0.50 COMPZN, DRILLOUT TRIP T POOH f/ 3200' to 2076'. 3,200.0 2,076.0 11/27/2023 00:30 11/27/2023 03:30 3.00 COMPZN, DRILLOUT PULD T POOH LD 4" DP f/ 2076' to HWDP. 3,200.0 180.0 11/27/2023 03:30 11/27/2023 04:30 1.00 COMPZN, DRILLOUT PULD T POOH LD 4" HWDP. Inspect and drift. MU and rack back. 180.0 0.0 11/27/2023 04:30 11/27/2023 06:30 2.00 PROD1, DRILL BHAH T RIH w/ 6 1/2" production BHA. 0.0 318.0 11/27/2023 06:30 11/27/2023 10:00 3.50 PROD1, DRILL TRIP P RIH w/ 6 1/2" production BHA f/ 318' to 2211'. 318.0 2,211.0 11/27/2023 10:00 11/27/2023 10:30 0.50 PROD1, DRILL CIRC P Shallow test smart tools. Good test. 2,211.0 2,210.0 11/27/2023 10:30 11/27/2023 16:30 6.00 PROD1, DRILL TRIP P RIH f/ 2210' to 11487'. 2,210.0 11,487.0 11/27/2023 16:30 11/27/2023 18:00 1.50 PROD1, DRILL SLPC P Slip/Cut drill line. SimOps: Circulate at 100 GPM. 11,487.0 11,487.0 11/27/2023 18:00 11/27/2023 18:30 0.50 PROD1, DRILL SVRG P Service top drive. 11,487.0 11,487.0 11/27/2023 18:30 11/27/2023 19:00 0.50 PROD1, DRILL CIRC P Bring pumps up to drilling rate and check tools. All good. 11,487.0 11,487.0 11/27/2023 19:00 11/27/2023 20:00 1.00 PROD1, DRILL SMPD P Retrieve trip nipple and install RCD bearing assembly. 11,487.0 11,487.0 11/27/2023 20:00 11/27/2023 21:00 1.00 PROD1, DRILL REAM P Wash/Ream f/ 11487' to 11806'. 100-200 GPM 370-1000 PSI 30-100 RPM 12-15k TQ. 11,487.0 11,806.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 11/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/27/2023 21:00 11/28/2023 00:00 3.00 PROD1, DRILL DDRL P Drill 11806' to 11887'. Displace to 8.8ppg FloPro Lite while drilling. 5-10k WOB 200 GPM 950 PSI 100-120 RPM 7k TQ 9.3ppg ECD 217k PU 160k SO 190k ROT 11,806.0 11,887.0 11/28/2023 00:00 11/28/2023 06:00 6.00 PROD1, DRILL DDRL P Drill 11887' to 12438'. 15k WOB 230 GPM 1187 PSI 120 RPM 8k TQ 9.5ppg ECD 203k PU 167k SO 180k ROT 11,806.0 12,438.0 11/28/2023 06:00 11/28/2023 12:00 6.00 PROD1, DRILL DDRL P Drill 12438' to 13005 MD'/ 8413' TVD. 15k WOB 230 GPM 1250 PSI 130 RPM 7k TQ 9.5ppg ECD 204k PU 164k SO 183k ROT 12,438.0 13,005.0 11/28/2023 12:00 11/28/2023 18:00 6.00 PROD1, DRILL DDRL P Drill 13005' to 13628' MD'/ 8396' TVD. Observed losses @ 13570'. 15k WOB 230 GPM 1187 PSI 130 RPM 7k TQ 9.6ppg ECD 205k PU 160k SO 185k ROT 13,005.0 13,628.0 11/28/2023 18:00 11/28/2023 19:00 1.00 PROD1, DRILL CIRC P Initial loss rate 130-140 BPH. Pump 50 bbls of 35 ppb LCM pill. Loses decreased to 60-70 BPH before LCM exited bit and then decreased to 20-30 BPH. Note: Slow pump rate and turn off tools before pill made it to smart tools. 13,628.0 13,628.0 11/28/2023 19:00 11/29/2023 00:00 5.00 PROD1, DRILL DDRL P Drill 13628' to 14184' MD'/ 8396' TVD. Adding 10bbls of 35ppb per std to active as background LCM. Losses 25-40 BPH 15k WOB 230 GPM 1345 PSI 120 RPM 7k TQ 9.7ppg ECD 205k PU 160k SO 190k ROT 13,628.0 14,184.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 12/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/29/2023 00:00 11/29/2023 03:30 3.50 PROD1, DRILL DDRL P Drill 14184' to 14592' MD'/ 8427' TVD. Went on 70-90 BPH losses @ 14483'. Pump 50bbls of 35ppb LCM pill. 15k WOB 230 GPM 1345 PSI 120 RPM 7k TQ 9.7ppg ECD 205k PU 160k SO 190k ROT 14,184.0 14,592.0 11/29/2023 03:30 11/29/2023 04:15 0.75 PROD1, DRILL CIRC P PU off bottom and slow rates to keep tools off as LCM passed through BHA. Losses decreasing to 40-50 BPH. 130 GPM 570 PSI 80 RPM 5k TQ 14,592.0 14,592.0 11/29/2023 04:15 11/29/2023 06:30 2.25 PROD1, DRILL DDRL P Drill 14592' to 14803' MD'/ 8363' TVD. Went on total losses @ 14625'.Line up pump on annulus @ 1bpm to keep hole full. 15k WOB 230 GPM 1345 PSI 120 RPM 7k TQ 9.4ppg ECD 205k PU 160k SO 190k ROT SimOps: Building LCM pill. 14,592.0 14,803.0 11/29/2023 06:30 11/29/2023 08:00 1.50 PROD1, DRILL BKRM T BROOH f/ 14803' to 14517'. Pumping down annulus @ 3 BPM to keep hole full. 200 GPM 930 PSI 80 RPM 4k TQ SimOps: Building LCM pill. 14,803.0 14,517.0 11/29/2023 08:00 11/29/2023 10:15 2.25 PROD1, DRILL CIRC T Drop 1.75" WC opening ball and pump down at 2 BPM. Landed @ 980 stks. Shifted open @ 1357 PSI. Drop Isolation ball and pump down @ 2 BPM. SimOps: Building LCM pill. 14,517.0 14,517.0 11/29/2023 10:15 11/29/2023 14:00 3.75 PROD1, DRILL CIRC T Pump 100 BBLs of 100 PPB LCM pill. With 30 BBLs of pill out of WC observed returns. Start applying back pressure w/ MPD chokes. 200 PSI backpressure and 400 PSI on DP @ 2 BPM. Continue squeezing LCM pill. Losses deceased to 40 BPH. Drop 1.75" WC closing ball and pump down @ 2 BPM/240 PSI. Ball landed @ 965 STKs and shifted close @ 1432 PSI. Stage up rates and verify tools on. 14,517.0 14,517.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 13/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/29/2023 14:00 11/29/2023 15:00 1.00 PROD1, DRILL WASH T Wash in hole f/ 14517' to 14803'. 160-230 GPM 790-1300 PSI 14,517.0 14,803.0 11/29/2023 15:00 11/29/2023 19:00 4.00 PROD1, DRILL DDRL P Drill 14803' to 15182' MD'/ 8358' TVD. Closing choke on connections. 0 PSI build. 15k WOB 230 GPM 1345 PSI 120 RPM 7k TQ 9.4ppg ECD 205k PU 160k SO 190k ROT Losses: 70-120 BPH 14,803.0 15,182.0 11/29/2023 19:00 11/29/2023 21:00 2.00 PROD1, DRILL BKRM T BROOH f/ 15182' to 14517' 185 GPM 1150 PSI 80 RPM 6k TQ 15,182.0 14,517.0 11/29/2023 21:00 11/29/2023 23:00 2.00 PROD1, DRILL CIRC T Obtain base parameters. Drop 1.75" WC opening ball. Pump down @ 2 BPM/315 PSI. Landed @ 847stks. Shifted @ 1733 PSI. Stage up rates and confirm WC open. Drop 1.698" Isolation ball and pump down @ 3 BPM 375 PSI. 14,517.0 14,517.0 11/29/2023 23:00 11/30/2023 00:00 1.00 PROD1, DRILL CIRC T Pump 100 BBLs 25 ppb Gel pill followed by 100 BBLs of 100ppb LCM pill. 3 BPM 375 PSI 5 RPM 6k TQ. 14,517.0 14,517.0 11/30/2023 00:00 11/30/2023 01:30 1.50 PROD1, DRILL CIRC T Continue pumping pills. Close chokes as pill exits WC. Bullhead pills below bit decreasing rate from 120 GPM to 80 GPM as pressure increases. SD and monitor pressures. Bled down to 0 PSI. 120-80 GPM 340 PSI final MPD pressure. 545 PSI final SPP 14,517.0 14,517.0 11/30/2023 01:30 11/30/2023 03:30 2.00 PROD1, DRILL OWFF T BROOH one std to 14422'. Pump across top of hole and establish static loss rate. 45 BPH. 14,517.0 14,422.0 11/30/2023 03:30 11/30/2023 04:00 0.50 PROD1, DRILL CIRC T Pump 1.75" WC closing ball down @ 2 BPM. Landed @ 930 STKS. Shifted close @ 1460 PSI. 14,422.0 14,422.0 11/30/2023 04:00 11/30/2023 06:00 2.00 PROD1, DRILL CIRC T Stage pumps up to 200 GPM and confirm tools working. Establish dynamic loss rate. 72 BPH. SD and pump across top of hole monitoring loss rates. 14,422.0 14,422.0 11/30/2023 06:00 11/30/2023 09:30 3.50 PROD1, DRILL WAIT T Circulate across top of hole monitoring losses while waiting on cement swivel to arrive. 14,422.0 14,422.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 14/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/30/2023 09:30 11/30/2023 13:30 4.00 PROD1, DRILL BKRM T BROOH f/ 14422' to 13000'. 190 GPM 930 PSI 40 RPM 6k TQ 180k ROT 14,422.0 13,000.0 11/30/2023 13:30 11/30/2023 14:00 0.50 PROD1, DRILL CIRC T Stage up to 200 GPM and establish loss rates. 84 BPH 200 GPM 990 PSI 5 RPM 5k TQ 13,000.0 13,000.0 11/30/2023 14:00 11/30/2023 14:30 0.50 PROD1, DRILL RURD T RU cement swivel and cement line. 13,000.0 13,000.0 11/30/2023 14:30 11/30/2023 15:00 0.50 PROD1, DRILL CIRC T Establish injection rates. 2 BPM - 300 PSI SPP/0PSI IA 3 BPM - 598 PSI SPP/300 PSI IA. 4 BPM - 930 PSi SPP/345 PSI IA 13,000.0 13,000.0 11/30/2023 15:00 11/30/2023 17:30 2.50 PROD1, DRILL CMNT T PJSM. Pump 5 BBLs FW. Test lines to 3500 PSI. Mix and pump 30 BBLs 11.0 PPG Mud Push spacer + 125 BBLs 14.0 PPG Thixotropic cement + 21 BBLs 11.0 PPG Mud Push spacer. Chase w/ 20 BBLs FW. (Closed chokes and bullhead at 100 BBLs away). Swap over to rig pumps and bullhead w/ 115 BBLs 8.8 PPG FloPro. SD and monitor pressure. Bled to 0 PSI. Cement in place @ 17:30 hrs 11/30/23 3 BPM 38-945 PSI SPP 320-472 PSI IA 13,000.0 13,000.0 11/30/2023 17:30 11/30/2023 18:00 0.50 PROD1, DRILL RURD T RD Cement line and LD swivel. Establish static los rates. 58 BPH. 13,000.0 13,000.0 11/30/2023 18:00 11/30/2023 20:30 2.50 PROD1, DRILL SMPD T SOOH f/ 13000' to 11586'. Holding 8.8ppg EMW w/ MPD 13,000.0 11,568.0 11/30/2023 20:30 11/30/2023 21:00 0.50 PROD1, DRILL OWFF T Establish Static loss rate. 48 BPH. 11,568.0 11,568.0 11/30/2023 21:00 11/30/2023 23:00 2.00 PROD1, DRILL CIRC T Circulate down drillstring at 120 GPM (below tool rate) for 10 minutes. Pump 50 BBLs sugar water and stage rates up to 200 GPM. Confirm tools working. Pump sugar surface to surface to scour drillstring and clean tools. Dynamic loss rate 65 BPH. 200 GPM 1100 PSI 9.4ppg ECD 10 RPM 4k TQ 11,568.0 11,568.0 11/30/2023 23:00 12/1/2023 00:00 1.00 PROD1, DRILL OWFF T Circulate across top of hole. WOC and monitor loss rate. Static loss rate 48 BPH. 11,568.0 11,568.0 12/1/2023 00:00 12/1/2023 08:30 8.50 PROD1, DRILL OWFF T Circulate across top of hole. WOC and monitor loss rate. Static loss rate 48 BPH. 11,568.0 11,568.0 12/1/2023 08:30 12/1/2023 10:00 1.50 PROD1, DRILL SMPD T Install RCD bearing and SIH to 13000' while WOC. 11,568.0 13,000.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 15/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/1/2023 10:00 12/1/2023 16:30 6.50 PROD1, DRILL REAM T Wash/Ream f/ 13000' to 15183'. 150-180 GPM 500-1100 PSI 40-70 RPM 6-14k TQ Loss rate- 20-30 BPH 13,000.0 15,183.0 12/1/2023 16:30 12/1/2023 18:45 2.25 PROD1, DRILL CIRC T Tools stopped pulsing. Recycle pumps. Troubleshoot. Pumped 30 BBL FW pill. Tools came back on. 15,183.0 15,183.0 12/1/2023 18:45 12/2/2023 00:00 5.25 PROD1, DRILL DDRL P Drill 15182' to 15714' MD'/ 8351' TVD. Closing choke on connections. 0 PSI build. 18k WOB 230 GPM 1600 PSI 130 RPM 16k TQ 9.7ppg ECD 258k PU 128k SO 182k ROT Losses: 60 BPH 15,183.0 15,714.0 12/2/2023 00:00 12/2/2023 06:00 6.00 PROD1, DRILL DDRL P Drill 15714' to 16316' MD'/ 8341' TVD. Closing choke on connections. 0 PSI build. 9k WOB 230 GPM 1514 PSI 130 RPM 19k TQ 9.7ppg ECD 259k PU 118k SO 187k ROT 340 units Max gas 50.7 TTL bit hrs Losses: 50 BPH 15,714.0 16,316.0 12/2/2023 06:00 12/2/2023 12:00 6.00 PROD1, DRILL DDRL P Drill 16316' to 16953' MD'/ 8330' TVD. Closing choke on connections. 0 PSI build. 9k WOB 230 GPM 1480 PSI 130 RPM 18k TQ 9.6ppg ECD 258k PU 118k SO 189k ROT 240 units Max gas 55.1 TTL bit hrs Losses: 50 BPH 16,316.0 16,953.0 12/2/2023 12:00 12/2/2023 13:00 1.00 PROD1, DRILL CIRC T Circulate and condition mud while cleaning up flow line and shakers due to cement contamination. Blinding shaker screens. Install various sizes to mitigate shakers blinding. 16,953.0 16,953.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 16/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/2/2023 13:00 12/2/2023 18:00 5.00 PROD1, DRILL DDRL P Drill 16953' to 17435' MD'/ 8322' TVD. Closing choke on connections. 0 PSI build. 13k WOB 230 GPM 1400 PSI 130 RPM 15k TQ 9.6ppg ECD 251k PU 122k SO 190k ROT 500 units Max gax 55.1 TTL bit hrs Losses: 60 BPH 16,953.0 17,435.0 12/2/2023 18:00 12/3/2023 00:00 6.00 PROD1, DRILL DDRL P Drill 17435' to 18050' MD'/ 8312' TVD. Closing choke on connections. 0 PSI build. 10k WOB 200 GPM 1250 PSI 130 RPM 14k TQ 9.6ppg ECD 229k PU 140k SO 181k ROT 731 units Max gax 62.8 TTL bit hrs Losses: 65-70 BPH. Started adding background LCM at 17650'. 17,435.0 18,050.0 12/3/2023 00:00 12/3/2023 06:00 6.00 PROD1, DRILL DDRL P Drill 18050' to 18715' MD/ 8312' TVD. Closing choke on connections. 0 PSI build. 6k WOB 200 GPM 1230 PSI 130 RPM 7k TQ 9.4ppg ECD 227k PU 142k SO 184k ROT 2010 units Max gax 67.4 TTL bit hrs Losses: 65-70 BPH. Started adding background LCM at 17650'. 18,050.0 18,715.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 17/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/3/2023 06:00 12/3/2023 10:00 4.00 PROD1, DRILL DDRL P Drill 18715' to 19100' MD/ 8300' TVD. TD section. Closing choke on connections. 0 PSI build. 2k WOB 200 GPM 1300 PSI 120 RPM 5k TQ 9.6ppg ECD 232k PU 133k SO 184k ROT 550 units Max gax 70.1 TTL bit hrs Losses: 65-70 BPH. Started adding background LCM at 17650'. 18,715.0 19,100.0 12/3/2023 10:00 12/3/2023 12:00 2.00 PROD1, TRIPCAS CIRC P Take final survey. Downlink and turn tools off. Circulate BU. 230 GPM 1500 PSi 80 RPM 6k TQ 9.6ppg ECD 19,100.0 19,100.0 12/3/2023 12:00 12/3/2023 12:30 0.50 PROD1, TRIPCAS OWFF P Attempt to fingerprint well - on static losses. Flow check. Static losses = 48 BPH. 19,100.0 19,100.0 12/3/2023 12:30 12/4/2023 00:00 11.50 PROD1, TRIPCAS CIRC P Circulate Hole clean. Rotate and reciprocate drillstring from 19100' to 19020'. 200 GPM 1280 PSI 80 RPM 7k TQ. Static losses- 50 BPH Dynamic losses 75 BPH Note: Extended circulating due to waiting on Brine from mud plant. 19,100.0 19,100.0 12/4/2023 00:00 12/4/2023 01:00 1.00 PROD1, TRIPCAS CIRC P Circulate and prep to displace well. Rotate and reciprocate drillstring 19100' to 19020'. 200 GPM 1280 PSI 80 RPM 7k TQ. Static losses- 50 BPH Dynamic losses 75 BPH Note: Extended circulating due to waiting on Brine from mud plant. 19,100.0 19,100.0 12/4/2023 01:00 12/4/2023 05:00 4.00 PROD1, TRIPCAS CIRC P Displace hole to 8.8ppg Vis Brine. 200 GPM 1120 PSI 120 RPM 7k TQ 19,100.0 19,100.0 12/4/2023 05:00 12/4/2023 05:30 0.50 PROD1, TRIPCAS OWFF P Flow check. Static losses = 27 BPH 19,100.0 19,100.0 12/4/2023 05:30 12/4/2023 14:00 8.50 PROD1, TRIPCAS SMPD P SOOH f/ 19100' to 11856'. 0 PSI in slips/30 PSI out with MPD. 19,100.0 11,586.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 18/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/4/2023 14:00 12/4/2023 17:00 3.00 PROD1, TRIPCAS CIRC P Circulate casing clean. 230 GPM 1000 PSI 30 RPM 4k TQ 200k PU 173k SO 182k ROT 11,586.0 11,586.0 12/4/2023 17:00 12/4/2023 18:00 1.00 PROD1, TRIPCAS MPDA P Retrieve RCD bearing assembly and install trip nipple. Static loss rate 48 BPH. Drop 2.15" hollow drift w/ tail 11,586.0 11,586.0 12/4/2023 18:00 12/5/2023 00:00 6.00 PROD1, TRIPCAS TRIP P POOH f/ 11586' to 412'. Several overtorqued connections. 11,586.0 412.0 12/5/2023 00:00 12/5/2023 00:30 0.50 PROD1, TRIPCAS OWFF P Rack back last std of 4" DP. Flow check. Static loss rate 55 BPH. 412.0 315.0 12/5/2023 00:30 12/5/2023 02:30 2.00 PROD1, TRIPCAS BHAH P LD HWDP and BHA. 315.0 0.0 12/5/2023 02:30 12/5/2023 03:00 0.50 PROD1, TRIPCAS CLEN P Clean and clear rig floor. 0.0 0.0 12/5/2023 03:00 12/5/2023 04:00 1.00 COMPZN, CASING RURD P RU tbg handling equipment. 0.0 0.0 12/5/2023 04:00 12/5/2023 12:30 8.50 COMPZN, CASING PUTB P MU float shoe and visually check float. RIH w/ 4 1/2" 12.6# H563 tbg as per tally to 7618'. 0.0 7,618.0 12/5/2023 12:30 12/5/2023 13:30 1.00 COMPZN, CASING PUTB P MU liner hanger/packer. RIH. 7,618.0 7,664.0 12/5/2023 13:30 12/5/2023 23:00 9.50 COMPZN, CASING RUNL P RIH w/ liner on 4" DP f/ 7664' to 19100'. Filling pipe w/ fillup hose. Did not fill on last 10 stds. Set down 5k @ 19100'. At shoe - 140k PU 132k SO 15k ROT 20 RPM 3k TQ 7,664.0 19,100.0 12/5/2023 23:00 12/5/2023 23:30 0.50 COMPZN, CASING RURD P MU cement swivel and set liner on depth. 19,100.0 19,100.0 12/5/2023 23:30 12/6/2023 00:00 0.50 COMPZN, CEMENT CIRC P Attempt to shear flotation sub. 1/2 BPM 1st - 1200 PSI. Bleed off. 2nd - 1200 PSI. Bleed off. 19,100.0 19,100.0 12/6/2023 00:00 12/6/2023 00:30 0.50 COMPZN, CEMENT CIRC P Attempt to shear flotation sub. 1/2 BPM 3rd - 1300 PSI. Bleed off 4th - 1400 PSi. Hold and sheared at 1400psi. Stage rate up to 5 BPM. Fill liner. Decrease rate when catching pressure to 3 BPM. 450psi, pumped 135bbls to catch pressure. 19,095.0 19,095.0 12/6/2023 00:30 12/6/2023 03:30 3.00 COMPZN, CEMENT CIRC P Circulate surface to surface volume. 5 BPM/ 860 PSI. 85-90 BPH loss rate. PJSM. Pumped 8950stks (757bbls) 19,095.0 19,095.0 12/6/2023 03:30 12/6/2023 04:00 0.50 COMPZN, CEMENT RURD P SD. Swap over to cementers. RU bleeder liner to wash up cementers. Pump 10bbls water, Test lines to 4600psi. 19,095.0 19,095.0 12/6/2023 04:00 12/6/2023 06:00 2.00 COMPZN, CEMENT CMNT P Pump 37bbls 13.0ppg mud push, mix and pump 308bbls 15.3ppg CTD slim hole slurry. Cement wet at 04:24hrs. 19,095.0 19,095.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 19/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/6/2023 06:00 12/6/2023 07:00 1.00 COMPZN, CEMENT CMNT P Open bleeder. SLB pump 10bbls water, Line up to displace , Drop dart, Pump at 250gpm (caught pressre @ 510stks) reduce rate to 130gpm 600psi top dart land at 1320stks and sheared at 1132psi, @ 2350stks lower rate and bump at 2683stks 1,280psi, pressure up to 1,780psi, Hole 5min (All good) 19,095.0 19,095.0 12/6/2023 07:00 12/6/2023 07:45 0.75 COMPZN, CEMENT PRTS P Set hanger, Pressure up to 2500psi and hold 2 min, Slack off to 43k, Pressure up to 3,970psi to release hanger, Bled off to 0psi, P/U to 210k, P/U 6' and expose dog sub, S/O 50k, P/U, rotate 20rpm set down to130k confirm packer set. TOL at 11,446' MD Shoe at 19,095' MD 19,095.0 19,095.0 12/6/2023 07:45 12/6/2023 08:15 0.50 COMPZN, CEMENT RURD P R/D Cement swivel and lines. 19,095.0 19,095.0 12/6/2023 08:15 12/6/2023 09:00 0.75 COMPZN, WELLPR CIRC P Pressure up to 500psi, Pull out liner top without pressure drop, P/U and observed returns, Circulate BU at 10bpm 427gpm 1060 - 1550psi. Mud push at surface at 4640stks at 3200stks dump cement (37bbls cement return) 11,446.0 11,426.0 12/6/2023 09:00 12/6/2023 10:30 1.50 COMPZN, WELLPR CIRC P Install and pump wipper ball at 430gpm 920-1050psi 11,426.0 11,404.0 12/6/2023 10:30 12/6/2023 12:00 1.50 COMPZN, WELLPR SLPC P Slip and cut 126' drill line, Set block hight and COM 11,404.0 11,404.0 12/6/2023 12:00 12/6/2023 15:00 3.00 COMPZN, WELLPR TRIP P POOH from 11,404' MD racking back 4" drill pipe. 11,404.0 7,328.0 12/6/2023 15:00 12/6/2023 20:30 5.50 COMPZN, WELLPR PULD P POOH L/D 4" drill pipe singles from 7,328' MD to 3,927' MD. 7,328.0 3,927.0 12/6/2023 20:30 12/6/2023 21:00 0.50 COMPZN, WELLPR SVRG P Service rig and pipe skate 3,927.0 3,927.0 12/6/2023 21:00 12/7/2023 00:00 3.00 COMPZN, WELLPR PULD P POOH L/D 4" drill pipe singles from 3,927' MD to 2,176' MD. (high torque connections) 3,927.0 2,176.0 12/7/2023 00:00 12/7/2023 03:30 3.50 COMPZN, WELLPR PULD P Continue L/D 4" drill pipe from 2,176' MD to Surface, (high torque connections) L/D running tools (good shear on dog sub). 2,176.0 0.0 12/7/2023 03:30 12/7/2023 04:30 1.00 COMPZN, WELLPR BHAH P M/U Baker 7-5/8" scrapper assy 60.80'. 0.0 60.0 12/7/2023 04:30 12/7/2023 10:45 6.25 COMPZN, WELLPR TRIP P Continue TIH from 60' MD to 11,038' MD. 60.0 11,038.0 12/7/2023 10:45 12/7/2023 13:00 2.25 COMPZN, WELLPR WASH P Wash in hole from 11,038' MD to 11,442' MD. Tagged 3X with 5k at 11,442' MD. GPM: 420 PSI: 1230 PU: 185k SO: 160 ROT: 176k TRQ: 3k 11,038.0 11,442.0 12/7/2023 13:00 12/7/2023 14:00 1.00 COMPZN, WELLPR CIRC P Circulate BTM's up at 11,442' MD, Pump 50bbls spacer and displace well to 8.8ppg corrosion inhibited brine. GPM: 420 PSI: 1620 PU: 195k SO: 155 11,442.0 11,442.0 12/7/2023 14:00 12/7/2023 15:00 1.00 COMPZN, WELLPR OWFF P OWFF 30min (static). Prep to L/D doubles. CO PSI reg on Shot Pin Assy. 11,442.0 11,442.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 20/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/7/2023 15:00 12/8/2023 00:00 9.00 COMPZN, WELLPR PULD P POOH from 11,442' MD to 2,901' MD, L/D 102 / 4" drill pipe in doubles. Continue L/D singles. 11,442.0 2,901.0 12/8/2023 00:00 12/8/2023 03:45 3.75 COMPZN, WELLPR PULD P Continue POOH and L/D 4" DP singles from 2,901' MD to surface. 2,901.0 0.0 12/8/2023 03:45 12/8/2023 04:30 0.75 COMPZN, WELLPR OWFF P OWFF (Static). L/D Scrapper assy. (Very little material on magnets and nothing in bootbaskets). No cement observed on tools. 0.0 0.0 12/8/2023 04:30 12/8/2023 05:45 1.25 COMPZN, WELLPR WWWH P Blow down top drive and equipment. Pull wear ring and jet stack. 0.0 0.0 12/8/2023 05:45 12/8/2023 07:00 1.25 COMPZN, WELLPR PRTS P Test liner top to 3,500psi for 30min (good test). 0.0 0.0 12/8/2023 07:00 12/8/2023 07:30 0.50 COMPZN, RPCOMP RURD P R/U to run 4.5" 12.6ppf, L80, H563 upper completion. 0.0 0.0 12/8/2023 07:30 12/8/2023 09:00 1.50 COMPZN, RPCOMP PUTB P PJSM. RIH w/ upper completion. P/U HES downhole gauge assembly & test to 9,500psi for 5min - Good test. CPAI witness. 0.0 120.0 12/8/2023 09:00 12/8/2023 12:00 3.00 COMPZN, RPCOMP PUTB P RIH w/4.5" 12.6ppf, L80, H563 upper completion to 2,417' MD. Running TEC line and installing Cannon clamps every joint. Checking control line every 1000' MD. 120.0 2,417.0 12/8/2023 12:00 12/8/2023 18:00 6.00 COMPZN, RPCOMP PUTB P Continue RIH w/4.5" 12.6ppf, L80, H563 upper completion to 7,900' MD. Running TEC line and installing Cannon clamps every joint. Checking control line every 1000' MD. 2,417.0 7,900.0 12/8/2023 18:00 12/8/2023 22:00 4.00 COMPZN, RPCOMP PUTB P Continue RIH w/4.5" 12.6ppf, L80, H563 upper completion to 11,451' MD. Running TEC line and installing Cannon clamps every joint. Checking control line every 1000' MD. Land tubing at 11,451' MD, Witness locater sheared with 12k. PU: 175k SO: 138k Down hole pressure: 3764psi Down hole temp: 157° 7,900.0 11,451.0 12/8/2023 22:00 12/9/2023 00:00 2.00 COMPZN, RPCOMP OTHR P MU pup joints - 9.9', 9.8', 8.08', 5.78' and rerun joint #272. MU hanger and landing joint. Terminate line through hanger and test to 5,000psi - Good test. Land hanger with 138k. RILD. (3.36' above full located). Fill stack and flood lines. 11,411.0 11,451.0 12/9/2023 00:00 12/9/2023 00:30 0.50 COMPZN, RPCOMP PRTS P RU test equipment. Test hanger seals to 3000 psi for 5 min - Good test. 0.0 0.0 12/9/2023 00:30 12/9/2023 01:00 0.50 COMPZN, RPCOMP OTHR P Drop 1-5/16" ball and rod. 0.0 0.0 12/9/2023 01:00 12/9/2023 03:30 2.50 COMPZN, RPCOMP PRTS P RU test lines. Pressure up tubing, set packer and test tubing to 4,200 psi for 30 min. Bleed tubing down to 3,000 psi, bring pressure on IA to 4,200 psi and hold pressure for 30 min. Bleed tubing to 0 psi, shear SOV. Tubing and IA equalized and bled to 0 psi. Observed IA for flow for 30 min - No flow. 0.0 0.0 12/9/2023 03:30 12/9/2023 06:00 2.50 COMPZN, RPCOMP OTHR P Vac out BOP stack. Pull landing joint and install BPV. Pump down IA. Test BPV in direction of flow to 3,000 psi for 10 min 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 21/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/9/2023 06:00 12/9/2023 06:30 0.50 COMPZN, RPCOMP OTHR P Blow down all surface equipment. 0.0 0.0 12/9/2023 06:30 12/9/2023 07:30 1.00 COMPZN, RPCOMP RURD P De-Energize KOOMEY, Clean flow box and L/D mouse hole. 0.0 0.0 12/9/2023 07:30 12/9/2023 09:30 2.00 COMPZN, WHDBOP NUND P Remove trip nipple, break bolts on stack and remove choke and kill lines. Skid BOP's into STOW position. Remove risers. 0.0 0.0 12/9/2023 09:30 12/9/2023 12:00 2.50 COMPZN, WHDBOP NUND P HES terminate TEC line and install 10k adaptor flange. Torque adaptor, (test to 5k 10 min). Stage 10k tree in cellar. 0.0 0.0 12/9/2023 12:00 12/9/2023 14:00 2.00 COMPZN, WHDBOP NUND P N/U 10k frac tree and test to 9,600psi (good test). 0.0 0.0 12/9/2023 14:00 12/9/2023 18:00 4.00 COMPZN, WHDBOP FRZP P Pull BPV, R/U LRS, test lines to 3500 psi, Pump 50 bbls diesel down IA taking returns up tubing. Shut down and let U- Tube for one hour. IA: 0psi OA: 0psi TBG: 0psi 0.0 0.0 12/9/2023 18:00 12/9/2023 21:00 3.00 COMPZN, WHDBOP RURD P R/D all service lines and equipment. Secure well for MOB. 0.0 0.0 12/9/2023 21:00 12/10/2023 00:00 3.00 COMPZN, WHDBOP RURD P Clean pits and cellar area and tree, Install companion flanges and gauges. Clear 5k tree from rig floor. SIMOPS: Scope down derrick, Secure top drive, Unspool drill line, Blow down steam system and lower cattle chute. Rig release from MT7-03 RWO at 00:00 hrs 12-10-23. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 1 Laboratory Cement Test Report CPAI - MT7-03 - Kick Off Plug - Liquid Adds - Field Blend LAR Name : AKA 2023-114 Client : CPAI Location : Prudhoe Bay Date : Nov-19-2023 Well Name : MT7-03 Rig : Doyon 25 String : KickOffPlug Signatures Report created by: Roarke Burnett Design input by: Stephen Lauper Job Type : Remedial MD : 11,824.00 ft TVD : 8,351.76 ft BHST : 195 °F BHCT : 161 °F BHP : 3,941 psi Starting Temp : 75 °F Time To Temp : 00:37 hr:mn Heating Rate : 0.00 °F/min Starting Pressure : 0 psi Time To Pressure : 00:37 hr:mn Composition Slurry Density : 16.50 lb/gal Yield : 1.067 ft³/sk of blend Mix Fluid : 4.462 gal/sk of blend Solid Vol. Fraction : 44.099 %Slurry Type : Mix Water : 3.982 gal/sk of blend Code Concentration Sack Reference Component Blend Density Lot Number D907 100.000 % BWOB Blend sack: 94.00 lb Cement 3.2000 kg/L Silo 29 D047 0.050 gal/sk VBWOB Anti Foam D009L95L04 D080 0.200 gal/sk VBWOB Dispersant 8R3H0003A0 D168 0.200 gal/sk VBWOB Fluid loss USBR028268 D110 0.030 gal/sk VBWOB Retarder DLM-25293 Fresh Water 3.982 gal/sk of blend Base Fluid Alpine K-Pad Rheology S/N: 1019 Surface (Configuration: R1B1 F1.0) Temperature 80 °F (rpm)Up (deg) Down (deg) Average (deg) 300 73 73 73 200 50 50 50 100 27 27 27 60 17 17 17 30 10 10 10 6 4 4 4 3 3 3 3 10 sec Gel 4 deg - 4 lbf/100ft² 10 min Gel Max >300 deg - 319 lbf/100ft² 10 min Gel Stable 23 deg - 23 lbf/100ft 2 Rheo. computed PV: 70 cP, Ty: 3 lbf/100ft² S/N: 1019 Downhole (Configuration: R1B1 F1.0) Temperature 161 °F (rpm)Up (deg) Down (deg) Average (deg) 300 198 198 198 200 142 143 143 100 79 79 79 60 50 50 50 30 27 28 28 6 7 7 7 3 4 4 4 10 sec Gel 5 deg - 5 lbf/100ft² 10 min Gel 36 deg - 38 lbf/100ft² Rheo. computed PV: 196 cP, Ty: 7 lbf/100ft² Thickening Time S/N: 460 Consistency Time Temp Go/No-Go: On: 00:50 hr:mn Off: 00:45 hr:mn 30 Bc 01:47 hr:mn 161 °F 50 Bc 05:44 hr:mn 161 °F 70 Bc 05:59 hr:mn 161 °F 100 Bc 06:08 hr:mn 161 °F Free Fluid Trace / 250 mL in 2 hrs At 80 °F and 45 deg inclination Sedimentation: None Fluid Loss S/N: 14-08 #1 API/Calculated Fluid Loss 100.43 mL 41.00 mL in 20 mins at 161 °F Non Stirred Fluid Loss apparatus was utilized UCA S/N: 946R Conditioned at 161 °F and atm psi for 30 mins after reaching temperature Time CS Acoustic Impedance Temp 16:36 hr:mn 50 psi 3.000 Mrayl 189 °F 17:42 hr:mn 500 psi 4.000 Mrayl 189 °F Comments All slurries prepared and tested in accordance with API RP 10B-2 unless otherwise noted Time to Add Solids : 00:09 mn:sc Vortex Quality: good/visible Thickening Time: Thickening Time 1: Spike: 28 Bc 1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Replace Tubing Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 21050'feet 11469'feet true vertical 8176' feet none feet Effective Depth measured 11624'feet None feet true vertical 8304' feet None feet Perforation depth Measured depth True Vertical depth Tubing (size, grade, measured and true vertical depth) None Packers and SSSV (type, measured and true vertical depth)15189' 6052'' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: Kuparuk Oil Pool 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title:Contact Phone: Burst CollapseCasing 3056' 8304'11624' 8674' 6-1/2" 21020' 8176' 120'Conductor Surface 20"120' Intermediate Open Hole 3553' 11624 measured TVD 13-3/8" 7-5/8" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 221-024 50-103-20830-00-00 P.O. Box 100360 Anchorage, AK 99510 3. Address: ConocoPhillips Alaska, Inc. N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: AA081800, AA081803, AA081781 Greater Mooses Tooth/RendezvousOil Pool GMT MT7-03 Plugs Junk measured Length measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) Gas-Mcf MDSize 120' Well Shut-In 323-497 Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 11469-12492'. TOC 155' inside existing 7-5/8" casing - 43bbls of 16.5ppg Class G PACKER: None SSSV: None Joe Longo joseph.j.longo@conocophillips.com 907-947-4323Drilling Engineer Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov 3553'  By Grace Christianson at 8:14 am, Jan 04, 2024 DSR-1/26/24 RBDMS JSB 011124 Page 1/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/10/2023 00:00 11/11/2023 00:00 24.00 MIRU, MOVE MOB T Phase 3 condition. Wait on weather 0.0 0.0 11/11/2023 00:00 11/12/2023 00:00 24.00 MIRU, MOVE MOB T Phase 3 condition. Wait on weather 0.0 0.0 11/12/2023 00:00 11/12/2023 06:30 6.50 MIRU, MOVE MOB P Prep pad around MT7-03. Spot matting boards.Un hook interconnects. BD steam lines. Move ball mill. 0.0 0.0 11/12/2023 06:30 11/12/2023 14:00 7.50 MIRU, MOVE MOB P Lower cattle chute. Skid rig floor. LD derrick. Stomp modules back and ose trucks to pull down well row. 0.0 0.0 11/12/2023 14:00 11/13/2023 00:00 10.00 MIRU, MOVE MOB P Stomp out sub. Hook up jeep. Pull sub to MT7-03 and spot on rig mats. Stomp sub into position over MT7-03. 0.0 0.0 11/13/2023 00:00 11/13/2023 06:30 6.50 MIRU, MOVE MOB P Turn pipeshed. Spot in place.Pin pipe shed. Lay mats for csg shed. Spot csg shed. Spot pit module. Connect interconnects. 0.0 0.0 11/13/2023 06:30 11/13/2023 12:00 5.50 MIRU, MOVE MOB P Stomp pump module and motor module into place. Raise derrick. Skid rig floor. Spot ball mill. Hook up modules. Energize steam. 0.0 0.0 11/13/2023 12:00 11/13/2023 17:30 5.50 MIRU, MOVE MOB P Change out cable on cattle chute. Raise cattle chute. Raise chutes in pipe shed. Spool on drill line. Scope up derrick. 0.0 0.0 11/13/2023 17:30 11/13/2023 21:00 3.50 MIRU, MOVE MOB P Work on rig acceptance checklist. Test Gen/Hiline sync. Troubleshoot Amphion alarms. Test gas alarms. Accept rig @ 21:00hrs 11/13/23 0.0 0.0 11/13/2023 21:00 11/14/2023 00:00 3.00 MIRU, WELCTL RURD P Build hooch around cellar. Take on fluid to pis. C/O saver sub. Install belt guard on mud pump. 0.0 0.0 11/14/2023 00:00 11/14/2023 05:00 5.00 MIRU, WELCTL RURD P Change out saver sub.Install bails/clamps. Take on 8.8ppg VisBrine. MU squeeze manifold in celllar. line up to Frac tank. Initial pressures: IA - 640psi TBG - 640psi OA - 0psi 0.0 0.0 11/14/2023 05:00 11/14/2023 07:00 2.00 MIRU, WELCTL OWFF P Open IA to frac tank. Bleed off 100bbls (diesel) to frac tank. Final pressure 750psi. Line up TBG to frac tank. Bled from 720psi to 640psi. 0.0 0.0 11/14/2023 07:00 11/14/2023 10:00 3.00 MIRU, WELCTL CIRC P Line up and pump 275bbls 8.8ppg Vis Brine down TBG. Stage up to 6 BPM. Initial pressure: IA-1015psi/TBG-630psi Final pressure: IA-1620pis/TBG-365psi 0.0 0.0 11/14/2023 10:00 11/14/2023 12:00 2.00 MIRU, WELCTL CIRC P Line up and pump 325bbls 8.8ppg Vis Brine down IA. Stage up to 4 BPM. Initial pressure:IA-1160psi/TBG-vac. Final pressure: IA 620psi/TBG-220psi. 0.0 0.0 11/14/2023 12:00 11/14/2023 12:30 0.50 MIRU, WELCTL RURD P Flowcheck tubing and IA. Both on vac. Install BPV. 0.0 0.0 11/14/2023 12:30 11/14/2023 13:00 0.50 MIRU, WELCTL PRTS P Perform rolling test on BPV. 4 BPM final circulating pressure 550psi. No leaks observed. 0.0 0.0 11/14/2023 13:00 11/14/2023 15:00 2.00 COMPZN, WHDBOP NUND P ND tree and tbg head adapter, Install blanking plug in tbg hanger. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 2/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/14/2023 15:00 11/14/2023 22:00 7.00 COMPZN, WHDBOP NUND P NU BOPE and MPD equipment. 0.0 0.0 11/14/2023 22:00 11/15/2023 00:00 2.00 COMPZN, WHDBOP RURD P Install trip nipple. MU blank plug and XO. Perform BOP break in procedure. 0.0 0.0 11/15/2023 00:00 11/15/2023 02:00 2.00 COMPZN, WHDBOP RURD P Pull test joint. Remove master bushings. Seal up flow box. 0.0 0.0 11/15/2023 02:00 11/15/2023 02:45 0.75 COMPZN, WHDBOP RURD P MU BPA. Stage spooler to rig floor. Hook up super sucker and retrieve flashlight in BOPE stack. 0.0 0.0 11/15/2023 02:45 11/15/2023 04:45 2.00 COMPZN, WHDBOP BOPE P Attempt shell test. Observed leak. CO ring gasket in choke line. Shell test. Good. 0.0 0.0 11/15/2023 04:45 11/15/2023 06:00 1.25 COMPZN, WHDBOP BOPE P Testing BOPE. 0.0 0.0 11/15/2023 06:00 11/15/2023 14:45 8.75 COMPZN, WHDBOP BOPE T Test BOPE all test T/ 250 low for 5 min and 5,000 high for 10 min charted. W/ exception of annular T/ 250 low for 5 min and 3,500 high for 10 min. Manual operated & super choke tested T/2,000 psi charted, Test w/ 3 1/2" and 4 1/2" test joint.Test choke valves 1-15, manual operated & super choke, Choke & kill manuals, HCR's, 4" valves on kill line, 4" FOSV, 4" Dart valve, Upper and lower IBOP on TD; Blind/shear rams; Perform KOOMEY drawdown, ACC = 3000 PSI. MANIF. = 1500 PSI. ACC = 1800 PSI After all functions on bottles, 15 sec for 200 psi. Build W/ 2 Elec. pumps, 97 sec T/ Build full system. Pressure W/ 2 Elec. & 2 Air pumps, Closing times, Annular = 26 sec. UPR = 14 sec. Blind / Shears = 6 sec. LPR = 5 sec. Choke HCR = 2 sec. Kill HCR = 2 sec; Test PVT G/L and flow out alarms, Test LEL and H2S alarms. Witnessed by AOGCC Cam St John. BLM waived witness per Quinn Sawyer. 0.0 0.0 11/15/2023 14:45 11/15/2023 17:00 2.25 COMPZN, WHDBOP MPDA P RU and test MPD. 200psi low/1800psi high f/ 5/10min ea. Good test. 0.0 0.0 11/15/2023 17:00 11/15/2023 18:00 1.00 COMPZN, WHDBOP RURD P BD choke manifold/Kill line. PU 4.5" handling equipment, XO's. 0.0 0.0 11/15/2023 18:00 11/15/2023 19:30 1.50 COMPZN, WHDBOP OWFF P RU T-Bar. Check for flow below BPV. Flow observed. Decision made to Kill well pumping down tbg. 0.0 0.0 11/15/2023 19:30 11/15/2023 23:00 3.50 COMPZN, WHDBOP CIRC P Line up and pump down tbg @ 75 GPM. ICP-930psi/FCP 140psi. 4480stks 380bbls pumped. 0.0 0.0 11/15/2023 23:00 11/16/2023 00:00 1.00 COMPZN, WHDBOP OTHR P Drain BOPE stack w/ Super Sucker vac truck. 0.0 0.0 11/16/2023 00:00 11/16/2023 02:00 2.00 COMPZN, WHDBOP OWFF P Drain stack with Vac truck. Check for pressure below BPV. Observed flow. 0.0 0.0 11/16/2023 02:00 11/16/2023 05:30 3.50 COMPZN, WHDBOP OTHR P Discuss plan forward with office. 0.0 0.0 11/16/2023 05:30 11/16/2023 08:30 3.00 COMPZN, WHDBOP OTHR P Pump down tbg to kill well. Stage rate to 4 BPM. 7100stks 600bbls ICPs: TBG:615psi IA 235psi FCP: TBG: 615psi IA: 165psi 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 3/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/16/2023 08:30 11/16/2023 10:30 2.00 COMPZN, WHDBOP OTHR P Check for pressure below BPV.No pressure. Retrieve BPV. Monitor well. Loss rate at 90 BPH. 0.0 0.0 11/16/2023 10:30 11/16/2023 13:00 2.50 COMPZN, WHDBOP OTHR P Pump down IA and tbg. 1/2 BPM down tbg and 4 BPM down IA. 450 bbls. ICP: IA: 340psi FCP: IA: 930psi. 0.0 0.0 11/16/2023 13:00 11/16/2023 15:30 2.50 COMPZN, RPCOMP PULD P Back out lockdown screws. Pull tbg hanger to rig floor. 216k. LD landing joint,XOs and hanger. 0.0 0.0 11/16/2023 15:30 11/17/2023 00:00 8.50 COMPZN, RPCOMP PULD P POOH LD 4 1/2" tbg f/ 12376' to 7779'. 12,376.0 7,779.0 11/17/2023 00:00 11/17/2023 13:00 13.00 COMPZN, RPCOMP PULD P POOH LD 4 1/2" tbg f/ 7779' to surface. 7,779.0 0.0 11/17/2023 13:00 11/17/2023 14:30 1.50 COMPZN, WELLPR RURD P RD handling equipment. TEC spool. Clean and clear rig floor. 0.0 0.0 11/17/2023 14:30 11/17/2023 15:30 1.00 COMPZN, WELLPR RURD P Stage BHA to rig floor. RU 4" handling equipment. 0.0 0.0 11/17/2023 15:30 11/17/2023 16:15 0.75 COMPZN, WELLPR RURD P Install wear bushing. 0.0 0.0 11/17/2023 16:15 11/17/2023 16:45 0.50 COMPZN, WELLPR BHAH P PJSM. PU BHA 0.0 0.0 11/17/2023 16:45 11/17/2023 17:15 0.50 COMPZN, WELLPR SVRG P Service rig. Adjust link tilts. 0.0 0.0 11/17/2023 17:15 11/17/2023 19:00 1.75 COMPZN, WELLPR BHAH P PU and RIH w/ BHA to 291'. 0.0 291.0 11/17/2023 19:00 11/17/2023 23:00 4.00 COMPZN, WELLPR PULD P RIH w/ 6 1/2" BHA singling in w/ 4" DP f/ 291' to 2345'. 291.0 2,345.0 11/17/2023 23:00 11/18/2023 00:00 1.00 COMPZN, WELLPR CIRC P Shallow test MWD. Good test. 2,345.0 2,345.0 11/18/2023 00:00 11/18/2023 13:15 13.25 COMPZN, WELLPR PULD P RIH w/ 6 1/2" BHA singling in w/ 4" DP f/ 2345' to 11615'. SimOps: Test MPD lines. 2,345.0 11,202.0 11/18/2023 13:15 11/18/2023 14:30 1.25 COMPZN, WELLPR SLPC P Slip/Cut drill line. 11,202.0 11,202.0 11/18/2023 14:30 11/18/2023 15:00 0.50 COMPZN, WELLPR SVRG P Service Top Drive. 11,202.0 11,615.0 11/18/2023 15:00 11/18/2023 16:00 1.00 COMPZN, WELLPR MPDA P Retrieve trip nipple and install RCD bearing assembly. 11,615.0 11,615.0 11/18/2023 16:00 11/18/2023 16:45 0.75 COMPZN, WELLPR CIRC P Break circulation. Stage up pumps to 220 GPM/830 PSI. 40 RPM/10k TQ. 255k PU 125 SO 183k ROT 11,615.0 11,615.0 11/18/2023 16:45 11/18/2023 17:00 0.25 COMPZN, WELLPR PULD P RIH w/ 6 1/2" BHA singling in w/ 4" DP f/ 11615' to 11678'. Set down 25k @ 11678'. 11,615.0 11,678.0 11/18/2023 17:00 11/18/2023 19:00 2.00 COMPZN, WELLPR WASH P Wash down f/ 11678' to 12032'. 175 GPM 600PSI 11,678.0 12,032.0 11/18/2023 19:00 11/18/2023 21:00 2.00 COMPZN, WELLPR PULD P RIH w/ 6 1/2" BHA singling in w/ 4" DP f/ 12032' to 13171'. Obstruction encountered @ 13161'. 12,032.0 13,171.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 4/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/18/2023 21:00 11/18/2023 23:00 2.00 COMPZN, WELLPR REAM P Wash/Ream f/ 13171' to 13252'. 175 GPM 700 PSi 40 RPM 12k TQ 4-10k WOB Observed PSI spike and hi TQ. Decide to circulate BU. 13,171.0 13,251.0 11/18/2023 23:00 11/19/2023 00:00 1.00 COMPZN, WELLPR CIRC P Reciprocate string while CBU. 200 GPM 810 PSI 40 RPM 12k TQ 13,251.0 13,251.0 11/19/2023 00:00 11/19/2023 01:00 1.00 COMPZN, WELLPR CIRC P Reciprocate string while CBU. 200 GPM 810 PSI 40 RPM 12k TQ 13,251.0 13,251.0 11/19/2023 01:00 11/19/2023 05:00 4.00 COMPZN, WELLPR REAM P Wash/Ream f/ 13251' to 13350'. 200 GPM 800 PSi 40 RPM 14k TQ 185k ROT 13,251.0 13,350.0 11/19/2023 05:00 11/19/2023 07:30 2.50 COMPZN, WELLPR BKRM P Pack off @ 13350'. Work pipe. Re- establish circulation. Stage pumps back to 200 GPM. Unable to BROOH continuing to packoff. 13,350.0 13,350.0 11/19/2023 07:30 11/19/2023 10:00 2.50 COMPZN, WELLPR BKRM P Reduce pump rate to 84 GPM/300 PSI. BROOH to 13065'. Attempt to pull on elevators. Observed 30k OP. 13,350.0 13,065.0 11/19/2023 10:00 11/19/2023 13:00 3.00 COMPZN, WELLPR BKRM P BROOH f/ 13065' to 12573'. 13,065.0 12,573.0 11/19/2023 13:00 11/19/2023 14:30 1.50 COMPZN, WELLPR SMPD P SOOH f/ 12573' to 11615'. 12,573.0 11,615.0 11/19/2023 14:30 11/19/2023 15:15 0.75 COMPZN, WELLPR RURD P RU cementing line pump in assembly. 12,573.0 11,615.0 11/19/2023 15:15 11/19/2023 16:30 1.25 COMPZN, WELLPR CIRC P CBU. 220 GPM. 870 PSI. 12,573.0 11,615.0 11/19/2023 16:30 11/19/2023 17:00 0.50 COMPZN, WELLPR CIRC P Establish injection rates @ 2/3/4 BPM. 2BPM - 430psi SPP/182psi ANN 3BPM - 550psi SPP/210psi ANN 4BPM - 720psi SPP/260psi ANN 11,615.0 11,615.0 11/19/2023 17:00 11/19/2023 20:00 3.00 COMPZN, WELLPR CIRC P PJSM. Test lines to 4000psi. Pump 35bbls 11.0ppg spacer + 110bbls 14.5ppg Thixotropic cement + 60bbls 14.0ppg Thixotropic cement + 20bbls 11.0ppg spacer and 20bbls FW. Closed chokes as spacer exited bit and bull head to loss zone. Swap over to rig pumps and displace/bullhead 119bbls of 8.8ppg Vis Brine. 3 BPM FCP 1000psi on IA/614psi SPP 11,615.0 11,615.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 5/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/19/2023 20:00 11/19/2023 21:15 1.25 COMPZN, WELLPR SQEZ P SD f/ 5 minutes Squeeze 10bbls @ 1BPM - SPP 520psi/IA 380psi SD f/ 10 minutes. Squeeze 10bbls @ 1 BPM - SPP 375psi/IA 230psi SD f/ 10 minutes. Squeeze 10bbls @ 1 BPM - SPP 195psi/IA 4psi. SD f/ 10 minutes. Cement in place @ 21:15hrs 11/19/23 11,615.0 11,615.0 11/19/2023 21:15 11/19/2023 21:45 0.50 COMPZN, WELLPR SMPD P SOOH 5 stds to 11170'. 11,615.0 11,170.0 11/19/2023 21:45 11/20/2023 00:00 2.25 COMPZN, WELLPR CIRC P Stage up rates to 5 BPM. Check tools. All good. Pump 40bbl sugar water pill + 30 bbl HiVis pill. Chase pills w/ DS volume. loss rate: 2 BPM 35 BPH 4 BPM 75 BPH. 11,170.0 11,170.0 11/20/2023 00:00 11/20/2023 06:00 6.00 COMPZN, WELLPR WOC P Waiting on cement. Circulate across top of hole. Losses 25-30 BPH. SimOPs: Adjust link tilt. Grease crown and blocks. Troubleshoot electrical issue from rig maintenance. 11,170.0 11,170.0 11/20/2023 06:00 11/20/2023 09:00 3.00 COMPZN, WELLPR WOC P Waiting on cement. Break circulation and stage up to 200 GPM. Tools all working. Static losses 25-30 BPH. 11,170.0 11,170.0 11/20/2023 09:00 11/20/2023 10:00 1.00 COMPZN, WELLPR SMPD P Strip in hole to 11645'. 11,170.0 11,645.0 11/20/2023 10:00 11/20/2023 13:30 3.50 COMPZN, WELLPR RGRP T Troubleshoot VFD Chopper Issues. 11,645.0 11,645.0 11/20/2023 13:30 11/20/2023 15:45 2.25 COMPZN, WELLPR REAM P Ream in hole f/ 11645' to 12212'. 48 GPM 310 PSI 20 RPM 13k TQ 11,645.0 12,212.0 11/20/2023 15:45 11/20/2023 17:00 1.25 COMPZN, WELLPR CIRC P Circulate BU 200 GPM 840 PSI 40 RPM 14k TQ 12,212.0 12,212.0 11/20/2023 17:00 11/20/2023 21:30 4.50 COMPZN, WELLPR CIRC P Circulate 84 GPM 260 PSI 20 RPM 16k TQ 12,212.0 12,212.0 11/20/2023 21:30 11/21/2023 00:00 2.50 COMPZN, WELLPR CIRC T Take baseline parameters for opening well commander. Drop 1.75" openng ball. Pump down @ 2 BPM. No indications of ball landing in seat after pumping 50bbls over calculated strokes. Continue pumping. Work drill pipe. Vary RPMs. No indications ball seated. 12,212.0 12,212.0 11/21/2023 00:00 11/21/2023 01:30 1.50 COMPZN, WELLPR CIRC T Continue Adjusting parameters to shift well commander open. No success. Ream back down to 12212' 12,212.0 12,212.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 6/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/21/2023 01:30 11/21/2023 03:00 1.50 COMPZN, WELLPR CIRC P Pump 10 bbls spacer + 20 bbls 16.5ppg Gel pill + 10 bbls spacer. Displace with 130bbls 8.8 Vis Brine. Close chokes and bullhead into OH. Final circulating pressure SPP 1177 psi/IA 675 psi. 12,212.0 12,212.0 11/21/2023 03:00 11/21/2023 04:15 1.25 COMPZN, WELLPR SMPD P SOOH to inside casing @ 11568'. 12,212.0 11,568.0 11/21/2023 04:15 11/21/2023 05:00 0.75 COMPZN, WELLPR MPDA P Flow check. Retrieve RCD bearing assembly and install trip nipple. 12,212.0 11,568.0 11/21/2023 05:00 11/21/2023 05:30 0.50 COMPZN, WELLPR OWFF P Establish static loss rate. 15 BPH 11,568.0 11,568.0 11/21/2023 05:30 11/21/2023 06:00 0.50 COMPZN, WELLPR CIRC P Pump slug and blow down top drive. 11,568.0 11,568.0 11/21/2023 06:00 11/21/2023 08:30 2.50 COMPZN, WELLPR TRIP P Drop 2.5" drift w/ tail. POOH f/ 11568' to 7196'. 11,568.0 7,196.0 11/21/2023 08:30 11/21/2023 09:00 0.50 COMPZN, WELLPR RURD P Found 2.50" drift tail in Std #73. LD singles and retrieved drift in top of Std #72. Observed residual cement in STD. MU singles and drop 2.14" drift w/ tail in string. 7,196.0 7,196.0 11/21/2023 09:00 11/21/2023 12:00 3.00 COMPZN, WELLPR P POOH f/ 7196' to 1945' 7,196.0 1,945.0 11/21/2023 12:00 11/21/2023 12:30 0.50 COMPZN, WELLPR OWFF P Establish static loss rate. 21 BPH 1,945.0 1,945.0 11/21/2023 12:30 11/21/2023 14:00 1.50 COMPZN, WELLPR TRIP P TOOH f/ 1945' to 200'. 1,945.0 200.0 11/21/2023 14:00 11/21/2023 14:15 0.25 COMPZN, WELLPR OWFF P Flow check. Slow loss. PJSM f/ BHA 200.0 200.0 11/21/2023 14:15 11/21/2023 15:30 1.25 COMPZN, WELLPR BHAH P LD BHA. 200.0 0.0 11/21/2023 15:30 11/21/2023 16:00 0.50 COMPZN, WELLPR CLEN P Clean and clear rig floor. Stage Tbg handling equipment. 0.0 0.0 11/21/2023 16:00 11/21/2023 17:00 1.00 COMPZN, WELLPR RURD P RU 3 1/2" Tbg handling equipment. 0.0 0.0 11/21/2023 17:00 11/21/2023 19:00 2.00 COMPZN, WELLPR PULD P PJSM. RIH w/ 3 1/2" cementing stinger. 0.0 1,230.0 11/21/2023 19:00 11/21/2023 19:45 0.75 COMPZN, WELLPR RURD P MU XO. RD tbg handling equipment. 1,230.0 1,230.0 11/21/2023 19:45 11/22/2023 00:00 4.25 COMPZN, WELLPR TRIP P RIH w/ 3 1/2" cement stinger on 4" DP f/ 1230' to 10219'. 1,230.0 10,219.0 11/22/2023 00:00 11/22/2023 00:45 0.75 COMPZN, WELLPR TRIP P RIH f/ 10219' to 11546'. 10,219.0 11,546.0 11/22/2023 00:45 11/22/2023 01:15 0.50 COMPZN, WELLPR RURD P Flow check. Retrieve trip nipple. Install RCD bearing assembly. 11,546.0 11,546.0 11/22/2023 01:15 11/22/2023 03:00 1.75 COMPZN, WELLPR CIRC P Establish loss rates @ 4 BPM. 24 BPH. Obtain baseline parameters @ 2BPM. 257k PU 145k SO 182k ROT 10.5k TQ @ 10 RPM 11.5k TQ @ 15 RPM 11.7k TQ @ 20 RPM 11,546.0 11,546.0 11/22/2023 03:00 11/22/2023 03:30 0.50 COMPZN, WELLPR TRIP P RIH f/ 11546' to 12205' 11,546.0 12,205.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 7/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/22/2023 03:30 11/22/2023 05:45 2.25 COMPZN, WELLPR REAM P Wash/Ream in hole f/ 12205' to 12405'. Observe taking weight @ 12405'. Work string and wash down to 12492'. 84 GPM 200 PSI 20 RPM 13/14k TQ 180k ROT 12,205.0 12,492.0 11/22/2023 05:45 11/22/2023 10:00 4.25 COMPZN, WELLPR CIRC P Stage pumps to 210 GPM and circulate 3 BU. Rotate and reciprocate pipe. 210 GPM 491 PSI 12,492.0 12,492.0 11/22/2023 10:00 11/22/2023 12:00 2.00 COMPZN, WELLPR CIRC P Establish injection rates. Pump 100bbl LCM pill + 10bbl spacer + 20bbls 16.5ppg Gel pill + 10bbls spacer. Chase w/ 116bbls 8.8ppg Vis Brine. Close chokes and bullhead as LCM pill exits bit. FCP: SPP - 750psi IA - 1060psi 12,492.0 12,492.0 11/22/2023 12:00 11/22/2023 13:30 1.50 COMPZN, WELLPR RURD P RU cementing assembly. PJSM. Circulate @ 1 BPM/55PSI. 12,492.0 12,492.0 11/22/2023 13:30 11/22/2023 15:00 1.50 COMPZN, WELLPR CMNT P Flood lines and test to 3800psi. Good test. Pump 30bbls 13.0ppg mudpush spacer + 43bbls 16.5ppg G cement + 11bbls 13.0ppg mud push spacer. Displace w/ 99 bbls 8.8ppg Vis Brine. 12,492.0 12,492.0 11/22/2023 15:00 11/22/2023 15:30 0.50 COMPZN, WELLPR RURD P RD cementing assembly and BD lines. 12,492.0 12,492.0 11/22/2023 15:30 11/22/2023 17:30 2.00 COMPZN, WELLPR BKRM P BROOH f/ 12492' to 11357'. Observed several overpulls. Worked through. 1/4 BPM 10 RPM 8k TQ 12,492.0 11,357.0 11/22/2023 17:30 11/22/2023 20:00 2.50 COMPZN, WELLPR CIRC P Load nerf ball in DS. Circulate BU x 2. Observed soft cement/Gel/LCM across shakers at 1/3 of first BU. Dumped a total of 387 bbls of contaminated returns. Established loss rate after circulating BU. 6 BPH. 168 GPM 600 PSI 20 RPM 10k TQ. 11,357.0 11,357.0 11/22/2023 20:00 11/22/2023 20:45 0.75 COMPZN, WELLPR MPDA P Retrieve RCD bearing assembly and install trip nipple. 11,357.0 11,357.0 11/22/2023 20:45 11/23/2023 00:00 3.25 COMPZN, WELLPR TRIP P POOH f/ 11357' to 6716'. 11,357.0 6,716.0 11/23/2023 00:00 11/23/2023 03:00 3.00 COMPZN, WELLPR TRIP P POOH f/ 6716' to 1230' 6,716.0 1,230.0 11/23/2023 03:00 11/23/2023 03:30 0.50 COMPZN, WELLPR RURD P Flow check. RU tbg handling equipment. 1,230.0 1,230.0 11/23/2023 03:30 11/23/2023 06:00 2.50 COMPZN, WELLPR PULD P POOH LD 3 1/2" tbg f/ 1230' to surface. 1,230.0 0.0 11/23/2023 06:00 11/23/2023 06:45 0.75 COMPZN, WELLPR RURD P RD tbg handling equipment. Clean and clear rig floor. 0.0 0.0 11/23/2023 06:45 11/23/2023 09:00 2.25 COMPZN, DRILLOUT BHAH P PJSM. MU and RIH w/ 6 1/2" kick off BHA. 0.0 318.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 8/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/23/2023 09:00 11/23/2023 11:00 2.00 COMPZN, DRILLOUT TRIP P RIH w/ 6 1/2" kick off BHA to 2633'. 318.0 2,633.0 11/23/2023 11:00 11/23/2023 11:30 0.50 COMPZN, DRILLOUT SVRG P Service Rig. 2,633.0 2,633.0 11/23/2023 11:30 11/23/2023 13:00 1.50 COMPZN, DRILLOUT RGRP T Change out switch on Top drive. 2,633.0 2,633.0 11/23/2023 13:00 11/23/2023 18:00 5.00 COMPZN, DRILLOUT TRIP P RIH w/ 6 1/2" kick off f/ 2633' to 11340'. 2,633.0 11,340.0 11/23/2023 18:00 11/23/2023 19:00 1.00 COMPZN, DRILLOUT SLPC P Slip/Cut drillline. 11,340.0 11,340.0 11/23/2023 19:00 11/23/2023 19:30 0.50 COMPZN, DRILLOUT SVRG P Service rig. 11,340.0 11,340.0 11/23/2023 19:30 11/23/2023 20:30 1.00 COMPZN, DRILLOUT WASH P Break circulation and wash down f/ 11340'. Set down 15k @ 11469'. 200 GPM 1550PSI 11,340.0 11,469.0 11/23/2023 20:30 11/23/2023 22:00 1.50 COMPZN, DRILLOUT REAM P Wash/Ream f/ 11469' to 11644'. (20' below shoe). 200 GPM 1550PSI XX RPM 14-15k TQ. 11,469.0 11,644.0 11/23/2023 22:00 11/24/2023 00:00 2.00 COMPZN, DRILLOUT CIRC P Circulate BU and back ream into shoe to 11626' 200 GPM 1480 PSI 60 RPM 13k TQ. 11,644.0 11,626.0 11/24/2023 00:00 11/24/2023 00:30 0.50 COMPZN, DRILLOUT CIRC T Circulate BU and back ream into shoe to 11626' 200 GPM 1480 PSI 60 RPM 13k TQ. 11,626.0 11,626.0 11/24/2023 00:30 11/24/2023 02:15 1.75 COMPZN, DRILLOUT FIT P RU and perform shoe test to 12.1ppg EMW. RD test equipment. 11,626.0 11,626.0 11/24/2023 02:15 11/24/2023 03:15 1.00 COMPZN, DRILLOUT REAM P Wash/Ream f/ 11626' to 11720'. 200 GPM 1550 PSI 60 RPM 13k TQ 182k ROT 11,626.0 11,720.0 11/24/2023 03:15 11/24/2023 09:00 5.75 COMPZN, DRILLOUT DRLG P Reciprocate and ream to build trough for side track. 11720' to 11682'. 200 GPM 1550 PSi 60-80 RPM 13k TQ 182k ROT 11,720.0 11,720.0 11/24/2023 09:00 11/24/2023 18:00 9.00 COMPZN, DRILLOUT DRLG P Time driill f/ 11720' to 11731'. 200 GPM 1550 PSI 80 RPM 13-14k TQ 188 ROT 11,720.0 11,731.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 9/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/24/2023 18:00 11/25/2023 00:00 6.00 COMPZN, DRILLOUT DRLG P Time driill f/ 11731' to 11758'. 200 GPM 1550 PSI 80 RPM 13-14k TQ 188 ROT 11,731.0 11,758.0 11/25/2023 00:00 11/25/2023 02:30 2.50 COMPZN, DRILLOUT DDRL P Time drill f/ 11758' to 11806'. 200 GPM 1530 PSI 80 RPM 13-14k TQ. 11,758.0 11,806.0 11/25/2023 02:30 11/25/2023 03:00 0.50 COMPZN, DRILLOUT CIRC P Take survey. Drift Sidetrack f/ 11720' to 11806'. Set down 15k to confirm new hole. 11,806.0 11,806.0 11/25/2023 03:00 11/25/2023 05:00 2.00 COMPZN, DRILLOUT CIRC P Pump out of hole to 11695'. BROOH f/ 11695' to 11622' while circulating BU. 200 GPM 1530 PSI 20 RPM 13-14k TQ 188k ROT 11,806.0 11,622.0 11/25/2023 05:00 11/25/2023 05:30 0.50 COMPZN, DRILLOUT OWFF P Flow check. Static. Pump slug. Blow down Top Drive. 11,622.0 11,622.0 11/25/2023 05:30 11/25/2023 11:45 6.25 COMPZN, DRILLOUT TRIP P POOH to BHA at 270'. 11,622.0 270.0 11/25/2023 11:45 11/25/2023 12:30 0.75 COMPZN, DRILLOUT OWFF P Flow check. Static. Pull PS-21s and install master bushings. 270.0 270.0 11/25/2023 12:30 11/25/2023 14:00 1.50 COMPZN, DRILLOUT BHAH P LD BHA. 270.0 0.0 11/25/2023 14:00 11/25/2023 15:00 1.00 COMPZN, DRILLOUT CIRC P Function rams and jet BOPE. 0.0 0.0 11/25/2023 15:00 11/25/2023 15:30 0.50 COMPZN, DRILLOUT CLEN P Clean and clear rig floor. 0.0 0.0 11/25/2023 15:30 11/26/2023 00:00 8.50 COMPZN, DRILLOUT BOPE P Test BOPE all test T/ 250 low for 5 min and 5,000 high for 10 min charted. W/ exception of annular T/ 250 low for 5 min and 2,500 high for 10 min w/ 4" test joint. Manual operated & super choke tested T/2,000 psi charted, Test w/ 4" and 4 1/2" test joint.Test choke valves 1- 15, manual operated & super choke, Choke & kill manuals, HCR's, 4" valves on kill line, 4" FOSV, 4" Dart valve, Upper and lower IBOP on TD; Blind/shear rams; Perform KOOMEY drawdown, ACC = 3000 PSI. MANIF. = 1500 PSI. ACC = 1800 PSI After all functions on bottles, 17 sec for 200 psi. Build W/ 2 Elec. pumps, 97 sec T/ Build full system. Pressure W/ 2 Elec. & 2 Air pumps, Closing times, Annular = 27 sec. UPR = 6 sec. Blind / Shears = 5 sec. LPR = 5 sec. Choke HCR = 2 sec. Kill HCR = 2 sec; Test PVT G/L and flow out alarms, Test LEL and H2S alarms. Witnessed by AOGCC Sean Sullivan . BLM waived witness per Quinn Sawyer. 0.0 0.0 11/26/2023 00:00 11/26/2023 01:00 1.00 COMPZN, DRILLOUT BOPE P Test LPRs and manual chokes. 250/5000 PSI 5min low/10min high. 0.0 0.0 11/26/2023 01:00 11/26/2023 02:00 1.00 COMPZN, DRILLOUT RURD P Pull test plug/RD test equipment. Install wear bushing and lock down. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 10/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/26/2023 02:00 11/26/2023 05:00 3.00 COMPZN, DRILLOUT BHAH P MU and RIH w/ 6 1/2" production BHA. 0.0 318.0 11/26/2023 05:00 11/26/2023 06:30 1.50 COMPZN, DRILLOUT TRIP P RIH f/ 318' to 790'. Rattling DP to remove cement. Decision made to POOH. 318.0 790.0 11/26/2023 06:30 11/26/2023 07:00 0.50 COMPZN, DRILLOUT TRIP T POOH to BHA. 790.0 318.0 11/26/2023 07:00 11/26/2023 08:30 1.50 COMPZN, DRILLOUT BHAH T Rack back majority of BHA. Remove source. 318.0 0.0 11/26/2023 08:30 11/26/2023 12:00 3.50 COMPZN, DRILLOUT TRIP T MU open ended 4" mule shoe and RIH w/ 4" DP to 6146'. Rattling each joint with hammer to dislodge cement. Observed cement coming out stds 1-13. 0.0 6,146.0 11/26/2023 12:00 11/26/2023 12:30 0.50 COMPZN, DRILLOUT SVRG T Service rig. (Power surge blacked out rig trounbleshoot). 6,146.0 6,146.0 11/26/2023 12:30 11/26/2023 13:00 0.50 COMPZN, DRILLOUT RGRP T Troubleshoot power surge that blacked out rig. 6,146.0 6,146.0 11/26/2023 13:00 11/26/2023 16:00 3.00 COMPZN, DRILLOUT TRIP T RIH w/ 4" DP f/ 6146' to 11542'. 6,146.0 11,542.0 11/26/2023 16:00 11/26/2023 17:30 1.50 COMPZN, DRILLOUT CIRC T Pump 50 bbl 8.8ppg BiCarb pill and circulate surface to surface to clean drill pipe. 500 GPM 1920 PSI 11,542.0 11,542.0 11/26/2023 17:30 11/26/2023 18:00 0.50 COMPZN, DRILLOUT OWFF T Flow check and blow down Top drive. 11,542.0 11,542.0 11/26/2023 18:00 11/27/2023 00:00 6.00 COMPZN, DRILLOUT TRIP T POOH f/ 11542' to 3200'. 11,542.0 3,200.0 11/27/2023 00:00 11/27/2023 00:30 0.50 COMPZN, DRILLOUT TRIP T POOH f/ 3200' to 2076'. 3,200.0 2,076.0 11/27/2023 00:30 11/27/2023 03:30 3.00 COMPZN, DRILLOUT PULD T POOH LD 4" DP f/ 2076' to HWDP. 3,200.0 180.0 11/27/2023 03:30 11/27/2023 04:30 1.00 COMPZN, DRILLOUT PULD T POOH LD 4" HWDP. Inspect and drift. MU and rack back. 180.0 0.0 11/27/2023 04:30 11/27/2023 06:30 2.00 PROD1, DRILL BHAH T RIH w/ 6 1/2" production BHA. 0.0 318.0 11/27/2023 06:30 11/27/2023 10:00 3.50 PROD1, DRILL TRIP P RIH w/ 6 1/2" production BHA f/ 318' to 2211'. 318.0 2,211.0 11/27/2023 10:00 11/27/2023 10:30 0.50 PROD1, DRILL CIRC P Shallow test smart tools. Good test. 2,211.0 2,210.0 11/27/2023 10:30 11/27/2023 16:30 6.00 PROD1, DRILL TRIP P RIH f/ 2210' to 11487'. 2,210.0 11,487.0 11/27/2023 16:30 11/27/2023 18:00 1.50 PROD1, DRILL SLPC P Slip/Cut drill line. SimOps: Circulate at 100 GPM. 11,487.0 11,487.0 11/27/2023 18:00 11/27/2023 18:30 0.50 PROD1, DRILL SVRG P Service top drive. 11,487.0 11,487.0 11/27/2023 18:30 11/27/2023 19:00 0.50 PROD1, DRILL CIRC P Bring pumps up to drilling rate and check tools. All good. 11,487.0 11,487.0 11/27/2023 19:00 11/27/2023 20:00 1.00 PROD1, DRILL SMPD P Retrieve trip nipple and install RCD bearing assembly. 11,487.0 11,487.0 11/27/2023 20:00 11/27/2023 21:00 1.00 PROD1, DRILL REAM P Wash/Ream f/ 11487' to 11806'. 100-200 GPM 370-1000 PSI 30-100 RPM 12-15k TQ. 11,487.0 11,806.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 11/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/27/2023 21:00 11/28/2023 00:00 3.00 PROD1, DRILL DDRL P Drill 11806' to 11887'. Displace to 8.8ppg FloPro Lite while drilling. 5-10k WOB 200 GPM 950 PSI 100-120 RPM 7k TQ 9.3ppg ECD 217k PU 160k SO 190k ROT 11,806.0 11,887.0 11/28/2023 00:00 11/28/2023 06:00 6.00 PROD1, DRILL DDRL P Drill 11887' to 12438'. 15k WOB 230 GPM 1187 PSI 120 RPM 8k TQ 9.5ppg ECD 203k PU 167k SO 180k ROT 11,806.0 12,438.0 11/28/2023 06:00 11/28/2023 12:00 6.00 PROD1, DRILL DDRL P Drill 12438' to 13005 MD'/ 8413' TVD. 15k WOB 230 GPM 1250 PSI 130 RPM 7k TQ 9.5ppg ECD 204k PU 164k SO 183k ROT 12,438.0 13,005.0 11/28/2023 12:00 11/28/2023 18:00 6.00 PROD1, DRILL DDRL P Drill 13005' to 13628' MD'/ 8396' TVD. Observed losses @ 13570'. 15k WOB 230 GPM 1187 PSI 130 RPM 7k TQ 9.6ppg ECD 205k PU 160k SO 185k ROT 13,005.0 13,628.0 11/28/2023 18:00 11/28/2023 19:00 1.00 PROD1, DRILL CIRC P Initial loss rate 130-140 BPH. Pump 50 bbls of 35 ppb LCM pill. Loses decreased to 60-70 BPH before LCM exited bit and then decreased to 20-30 BPH. Note: Slow pump rate and turn off tools before pill made it to smart tools. 13,628.0 13,628.0 11/28/2023 19:00 11/29/2023 00:00 5.00 PROD1, DRILL DDRL P Drill 13628' to 14184' MD'/ 8396' TVD. Adding 10bbls of 35ppb per std to active as background LCM. Losses 25-40 BPH 15k WOB 230 GPM 1345 PSI 120 RPM 7k TQ 9.7ppg ECD 205k PU 160k SO 190k ROT 13,628.0 14,184.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 12/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/29/2023 00:00 11/29/2023 03:30 3.50 PROD1, DRILL DDRL P Drill 14184' to 14592' MD'/ 8427' TVD. Went on 70-90 BPH losses @ 14483'. Pump 50bbls of 35ppb LCM pill. 15k WOB 230 GPM 1345 PSI 120 RPM 7k TQ 9.7ppg ECD 205k PU 160k SO 190k ROT 14,184.0 14,592.0 11/29/2023 03:30 11/29/2023 04:15 0.75 PROD1, DRILL CIRC P PU off bottom and slow rates to keep tools off as LCM passed through BHA. Losses decreasing to 40-50 BPH. 130 GPM 570 PSI 80 RPM 5k TQ 14,592.0 14,592.0 11/29/2023 04:15 11/29/2023 06:30 2.25 PROD1, DRILL DDRL P Drill 14592' to 14803' MD'/ 8363' TVD. Went on total losses @ 14625'.Line up pump on annulus @ 1bpm to keep hole full. 15k WOB 230 GPM 1345 PSI 120 RPM 7k TQ 9.4ppg ECD 205k PU 160k SO 190k ROT SimOps: Building LCM pill. 14,592.0 14,803.0 11/29/2023 06:30 11/29/2023 08:00 1.50 PROD1, DRILL BKRM T BROOH f/ 14803' to 14517'. Pumping down annulus @ 3 BPM to keep hole full. 200 GPM 930 PSI 80 RPM 4k TQ SimOps: Building LCM pill. 14,803.0 14,517.0 11/29/2023 08:00 11/29/2023 10:15 2.25 PROD1, DRILL CIRC T Drop 1.75" WC opening ball and pump down at 2 BPM. Landed @ 980 stks. Shifted open @ 1357 PSI. Drop Isolation ball and pump down @ 2 BPM. SimOps: Building LCM pill. 14,517.0 14,517.0 11/29/2023 10:15 11/29/2023 14:00 3.75 PROD1, DRILL CIRC T Pump 100 BBLs of 100 PPB LCM pill. With 30 BBLs of pill out of WC observed returns. Start applying back pressure w/ MPD chokes. 200 PSI backpressure and 400 PSI on DP @ 2 BPM. Continue squeezing LCM pill. Losses deceased to 40 BPH. Drop 1.75" WC closing ball and pump down @ 2 BPM/240 PSI. Ball landed @ 965 STKs and shifted close @ 1432 PSI. Stage up rates and verify tools on. 14,517.0 14,517.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 13/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/29/2023 14:00 11/29/2023 15:00 1.00 PROD1, DRILL WASH T Wash in hole f/ 14517' to 14803'. 160-230 GPM 790-1300 PSI 14,517.0 14,803.0 11/29/2023 15:00 11/29/2023 19:00 4.00 PROD1, DRILL DDRL P Drill 14803' to 15182' MD'/ 8358' TVD. Closing choke on connections. 0 PSI build. 15k WOB 230 GPM 1345 PSI 120 RPM 7k TQ 9.4ppg ECD 205k PU 160k SO 190k ROT Losses: 70-120 BPH 14,803.0 15,182.0 11/29/2023 19:00 11/29/2023 21:00 2.00 PROD1, DRILL BKRM T BROOH f/ 15182' to 14517' 185 GPM 1150 PSI 80 RPM 6k TQ 15,182.0 14,517.0 11/29/2023 21:00 11/29/2023 23:00 2.00 PROD1, DRILL CIRC T Obtain base parameters. Drop 1.75" WC opening ball. Pump down @ 2 BPM/315 PSI. Landed @ 847stks. Shifted @ 1733 PSI. Stage up rates and confirm WC open. Drop 1.698" Isolation ball and pump down @ 3 BPM 375 PSI. 14,517.0 14,517.0 11/29/2023 23:00 11/30/2023 00:00 1.00 PROD1, DRILL CIRC T Pump 100 BBLs 25 ppb Gel pill followed by 100 BBLs of 100ppb LCM pill. 3 BPM 375 PSI 5 RPM 6k TQ. 14,517.0 14,517.0 11/30/2023 00:00 11/30/2023 01:30 1.50 PROD1, DRILL CIRC T Continue pumping pills. Close chokes as pill exits WC. Bullhead pills below bit decreasing rate from 120 GPM to 80 GPM as pressure increases. SD and monitor pressures. Bled down to 0 PSI. 120-80 GPM 340 PSI final MPD pressure. 545 PSI final SPP 14,517.0 14,517.0 11/30/2023 01:30 11/30/2023 03:30 2.00 PROD1, DRILL OWFF T BROOH one std to 14422'. Pump across top of hole and establish static loss rate. 45 BPH. 14,517.0 14,422.0 11/30/2023 03:30 11/30/2023 04:00 0.50 PROD1, DRILL CIRC T Pump 1.75" WC closing ball down @ 2 BPM. Landed @ 930 STKS. Shifted close @ 1460 PSI. 14,422.0 14,422.0 11/30/2023 04:00 11/30/2023 06:00 2.00 PROD1, DRILL CIRC T Stage pumps up to 200 GPM and confirm tools working. Establish dynamic loss rate. 72 BPH. SD and pump across top of hole monitoring loss rates. 14,422.0 14,422.0 11/30/2023 06:00 11/30/2023 09:30 3.50 PROD1, DRILL WAIT T Circulate across top of hole monitoring losses while waiting on cement swivel to arrive. 14,422.0 14,422.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 14/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/30/2023 09:30 11/30/2023 13:30 4.00 PROD1, DRILL BKRM T BROOH f/ 14422' to 13000'. 190 GPM 930 PSI 40 RPM 6k TQ 180k ROT 14,422.0 13,000.0 11/30/2023 13:30 11/30/2023 14:00 0.50 PROD1, DRILL CIRC T Stage up to 200 GPM and establish loss rates. 84 BPH 200 GPM 990 PSI 5 RPM 5k TQ 13,000.0 13,000.0 11/30/2023 14:00 11/30/2023 14:30 0.50 PROD1, DRILL RURD T RU cement swivel and cement line. 13,000.0 13,000.0 11/30/2023 14:30 11/30/2023 15:00 0.50 PROD1, DRILL CIRC T Establish injection rates. 2 BPM - 300 PSI SPP/0PSI IA 3 BPM - 598 PSI SPP/300 PSI IA. 4 BPM - 930 PSi SPP/345 PSI IA 13,000.0 13,000.0 11/30/2023 15:00 11/30/2023 17:30 2.50 PROD1, DRILL CMNT T PJSM. Pump 5 BBLs FW. Test lines to 3500 PSI. Mix and pump 30 BBLs 11.0 PPG Mud Push spacer + 125 BBLs 14.0 PPG Thixotropic cement + 21 BBLs 11.0 PPG Mud Push spacer. Chase w/ 20 BBLs FW. (Closed chokes and bullhead at 100 BBLs away). Swap over to rig pumps and bullhead w/ 115 BBLs 8.8 PPG FloPro. SD and monitor pressure. Bled to 0 PSI. Cement in place @ 17:30 hrs 11/30/23 3 BPM 38-945 PSI SPP 320-472 PSI IA 13,000.0 13,000.0 11/30/2023 17:30 11/30/2023 18:00 0.50 PROD1, DRILL RURD T RD Cement line and LD swivel. Establish static los rates. 58 BPH. 13,000.0 13,000.0 11/30/2023 18:00 11/30/2023 20:30 2.50 PROD1, DRILL SMPD T SOOH f/ 13000' to 11586'. Holding 8.8ppg EMW w/ MPD 13,000.0 11,568.0 11/30/2023 20:30 11/30/2023 21:00 0.50 PROD1, DRILL OWFF T Establish Static loss rate. 48 BPH. 11,568.0 11,568.0 11/30/2023 21:00 11/30/2023 23:00 2.00 PROD1, DRILL CIRC T Circulate down drillstring at 120 GPM (below tool rate) for 10 minutes. Pump 50 BBLs sugar water and stage rates up to 200 GPM. Confirm tools working. Pump sugar surface to surface to scour drillstring and clean tools. Dynamic loss rate 65 BPH. 200 GPM 1100 PSI 9.4ppg ECD 10 RPM 4k TQ 11,568.0 11,568.0 11/30/2023 23:00 12/1/2023 00:00 1.00 PROD1, DRILL OWFF T Circulate across top of hole. WOC and monitor loss rate. Static loss rate 48 BPH. 11,568.0 11,568.0 12/1/2023 00:00 12/1/2023 08:30 8.50 PROD1, DRILL OWFF T Circulate across top of hole. WOC and monitor loss rate. Static loss rate 48 BPH. 11,568.0 11,568.0 12/1/2023 08:30 12/1/2023 10:00 1.50 PROD1, DRILL SMPD T Install RCD bearing and SIH to 13000' while WOC. 11,568.0 13,000.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 15/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/1/2023 10:00 12/1/2023 16:30 6.50 PROD1, DRILL REAM T Wash/Ream f/ 13000' to 15183'. 150-180 GPM 500-1100 PSI 40-70 RPM 6-14k TQ Loss rate- 20-30 BPH 13,000.0 15,183.0 12/1/2023 16:30 12/1/2023 18:45 2.25 PROD1, DRILL CIRC T Tools stopped pulsing. Recycle pumps. Troubleshoot. Pumped 30 BBL FW pill. Tools came back on. 15,183.0 15,183.0 12/1/2023 18:45 12/2/2023 00:00 5.25 PROD1, DRILL DDRL P Drill 15182' to 15714' MD'/ 8351' TVD. Closing choke on connections. 0 PSI build. 18k WOB 230 GPM 1600 PSI 130 RPM 16k TQ 9.7ppg ECD 258k PU 128k SO 182k ROT Losses: 60 BPH 15,183.0 15,714.0 12/2/2023 00:00 12/2/2023 06:00 6.00 PROD1, DRILL DDRL P Drill 15714' to 16316' MD'/ 8341' TVD. Closing choke on connections. 0 PSI build. 9k WOB 230 GPM 1514 PSI 130 RPM 19k TQ 9.7ppg ECD 259k PU 118k SO 187k ROT 340 units Max gas 50.7 TTL bit hrs Losses: 50 BPH 15,714.0 16,316.0 12/2/2023 06:00 12/2/2023 12:00 6.00 PROD1, DRILL DDRL P Drill 16316' to 16953' MD'/ 8330' TVD. Closing choke on connections. 0 PSI build. 9k WOB 230 GPM 1480 PSI 130 RPM 18k TQ 9.6ppg ECD 258k PU 118k SO 189k ROT 240 units Max gas 55.1 TTL bit hrs Losses: 50 BPH 16,316.0 16,953.0 12/2/2023 12:00 12/2/2023 13:00 1.00 PROD1, DRILL CIRC T Circulate and condition mud while cleaning up flow line and shakers due to cement contamination. Blinding shaker screens. Install various sizes to mitigate shakers blinding. 16,953.0 16,953.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 16/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/2/2023 13:00 12/2/2023 18:00 5.00 PROD1, DRILL DDRL P Drill 16953' to 17435' MD'/ 8322' TVD. Closing choke on connections. 0 PSI build. 13k WOB 230 GPM 1400 PSI 130 RPM 15k TQ 9.6ppg ECD 251k PU 122k SO 190k ROT 500 units Max gax 55.1 TTL bit hrs Losses: 60 BPH 16,953.0 17,435.0 12/2/2023 18:00 12/3/2023 00:00 6.00 PROD1, DRILL DDRL P Drill 17435' to 18050' MD'/ 8312' TVD. Closing choke on connections. 0 PSI build. 10k WOB 200 GPM 1250 PSI 130 RPM 14k TQ 9.6ppg ECD 229k PU 140k SO 181k ROT 731 units Max gax 62.8 TTL bit hrs Losses: 65-70 BPH. Started adding background LCM at 17650'. 17,435.0 18,050.0 12/3/2023 00:00 12/3/2023 06:00 6.00 PROD1, DRILL DDRL P Drill 18050' to 18715' MD/ 8312' TVD. Closing choke on connections. 0 PSI build. 6k WOB 200 GPM 1230 PSI 130 RPM 7k TQ 9.4ppg ECD 227k PU 142k SO 184k ROT 2010 units Max gax 67.4 TTL bit hrs Losses: 65-70 BPH. Started adding background LCM at 17650'. 18,050.0 18,715.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 17/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/3/2023 06:00 12/3/2023 10:00 4.00 PROD1, DRILL DDRL P Drill 18715' to 19100' MD/ 8300' TVD. TD section. Closing choke on connections. 0 PSI build. 2k WOB 200 GPM 1300 PSI 120 RPM 5k TQ 9.6ppg ECD 232k PU 133k SO 184k ROT 550 units Max gax 70.1 TTL bit hrs Losses: 65-70 BPH. Started adding background LCM at 17650'. 18,715.0 19,100.0 12/3/2023 10:00 12/3/2023 12:00 2.00 PROD1, TRIPCAS CIRC P Take final survey. Downlink and turn tools off. Circulate BU. 230 GPM 1500 PSi 80 RPM 6k TQ 9.6ppg ECD 19,100.0 19,100.0 12/3/2023 12:00 12/3/2023 12:30 0.50 PROD1, TRIPCAS OWFF P Attempt to fingerprint well - on static losses. Flow check. Static losses = 48 BPH. 19,100.0 19,100.0 12/3/2023 12:30 12/4/2023 00:00 11.50 PROD1, TRIPCAS CIRC P Circulate Hole clean. Rotate and reciprocate drillstring from 19100' to 19020'. 200 GPM 1280 PSI 80 RPM 7k TQ. Static losses- 50 BPH Dynamic losses 75 BPH Note: Extended circulating due to waiting on Brine from mud plant. 19,100.0 19,100.0 12/4/2023 00:00 12/4/2023 01:00 1.00 PROD1, TRIPCAS CIRC P Circulate and prep to displace well. Rotate and reciprocate drillstring 19100' to 19020'. 200 GPM 1280 PSI 80 RPM 7k TQ. Static losses- 50 BPH Dynamic losses 75 BPH Note: Extended circulating due to waiting on Brine from mud plant. 19,100.0 19,100.0 12/4/2023 01:00 12/4/2023 05:00 4.00 PROD1, TRIPCAS CIRC P Displace hole to 8.8ppg Vis Brine. 200 GPM 1120 PSI 120 RPM 7k TQ 19,100.0 19,100.0 12/4/2023 05:00 12/4/2023 05:30 0.50 PROD1, TRIPCAS OWFF P Flow check. Static losses = 27 BPH 19,100.0 19,100.0 12/4/2023 05:30 12/4/2023 14:00 8.50 PROD1, TRIPCAS SMPD P SOOH f/ 19100' to 11856'. 0 PSI in slips/30 PSI out with MPD. 19,100.0 11,586.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 18/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/4/2023 14:00 12/4/2023 17:00 3.00 PROD1, TRIPCAS CIRC P Circulate casing clean. 230 GPM 1000 PSI 30 RPM 4k TQ 200k PU 173k SO 182k ROT 11,586.0 11,586.0 12/4/2023 17:00 12/4/2023 18:00 1.00 PROD1, TRIPCAS MPDA P Retrieve RCD bearing assembly and install trip nipple. Static loss rate 48 BPH. Drop 2.15" hollow drift w/ tail 11,586.0 11,586.0 12/4/2023 18:00 12/5/2023 00:00 6.00 PROD1, TRIPCAS TRIP P POOH f/ 11586' to 412'. Several overtorqued connections. 11,586.0 412.0 12/5/2023 00:00 12/5/2023 00:30 0.50 PROD1, TRIPCAS OWFF P Rack back last std of 4" DP. Flow check. Static loss rate 55 BPH. 412.0 315.0 12/5/2023 00:30 12/5/2023 02:30 2.00 PROD1, TRIPCAS BHAH P LD HWDP and BHA. 315.0 0.0 12/5/2023 02:30 12/5/2023 03:00 0.50 PROD1, TRIPCAS CLEN P Clean and clear rig floor. 0.0 0.0 12/5/2023 03:00 12/5/2023 04:00 1.00 COMPZN, CASING RURD P RU tbg handling equipment. 0.0 0.0 12/5/2023 04:00 12/5/2023 12:30 8.50 COMPZN, CASING PUTB P MU float shoe and visually check float. RIH w/ 4 1/2" 12.6# H563 tbg as per tally to 7618'. 0.0 7,618.0 12/5/2023 12:30 12/5/2023 13:30 1.00 COMPZN, CASING PUTB P MU liner hanger/packer. RIH. 7,618.0 7,664.0 12/5/2023 13:30 12/5/2023 23:00 9.50 COMPZN, CASING RUNL P RIH w/ liner on 4" DP f/ 7664' to 19100'. Filling pipe w/ fillup hose. Did not fill on last 10 stds. Set down 5k @ 19100'. At shoe - 140k PU 132k SO 15k ROT 20 RPM 3k TQ 7,664.0 19,100.0 12/5/2023 23:00 12/5/2023 23:30 0.50 COMPZN, CASING RURD P MU cement swivel and set liner on depth. 19,100.0 19,100.0 12/5/2023 23:30 12/6/2023 00:00 0.50 COMPZN, CEMENT CIRC P Attempt to shear flotation sub. 1/2 BPM 1st - 1200 PSI. Bleed off. 2nd - 1200 PSI. Bleed off. 19,100.0 19,100.0 12/6/2023 00:00 12/6/2023 00:30 0.50 COMPZN, CEMENT CIRC P Attempt to shear flotation sub. 1/2 BPM 3rd - 1300 PSI. Bleed off 4th - 1400 PSi. Hold and sheared at 1400psi. Stage rate up to 5 BPM. Fill liner. Decrease rate when catching pressure to 3 BPM. 450psi, pumped 135bbls to catch pressure. 19,095.0 19,095.0 12/6/2023 00:30 12/6/2023 03:30 3.00 COMPZN, CEMENT CIRC P Circulate surface to surface volume. 5 BPM/ 860 PSI. 85-90 BPH loss rate. PJSM. Pumped 8950stks (757bbls) 19,095.0 19,095.0 12/6/2023 03:30 12/6/2023 04:00 0.50 COMPZN, CEMENT RURD P SD. Swap over to cementers. RU bleeder liner to wash up cementers. Pump 10bbls water, Test lines to 4600psi. 19,095.0 19,095.0 12/6/2023 04:00 12/6/2023 06:00 2.00 COMPZN, CEMENT CMNT P Pump 37bbls 13.0ppg mud push, mix and pump 308bbls 15.3ppg CTD slim hole slurry. Cement wet at 04:24hrs. 19,095.0 19,095.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 19/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/6/2023 06:00 12/6/2023 07:00 1.00 COMPZN, CEMENT CMNT P Open bleeder. SLB pump 10bbls water, Line up to displace , Drop dart, Pump at 250gpm (caught pressre @ 510stks) reduce rate to 130gpm 600psi top dart land at 1320stks and sheared at 1132psi, @ 2350stks lower rate and bump at 2683stks 1,280psi, pressure up to 1,780psi, Hole 5min (All good) 19,095.0 19,095.0 12/6/2023 07:00 12/6/2023 07:45 0.75 COMPZN, CEMENT PRTS P Set hanger, Pressure up to 2500psi and hold 2 min, Slack off to 43k, Pressure up to 3,970psi to release hanger, Bled off to 0psi, P/U to 210k, P/U 6' and expose dog sub, S/O 50k, P/U, rotate 20rpm set down to130k confirm packer set. TOL at 11,446' MD Shoe at 19,095' MD 19,095.0 19,095.0 12/6/2023 07:45 12/6/2023 08:15 0.50 COMPZN, CEMENT RURD P R/D Cement swivel and lines. 19,095.0 19,095.0 12/6/2023 08:15 12/6/2023 09:00 0.75 COMPZN, WELLPR CIRC P Pressure up to 500psi, Pull out liner top without pressure drop, P/U and observed returns, Circulate BU at 10bpm 427gpm 1060 - 1550psi. Mud push at surface at 4640stks at 3200stks dump cement (37bbls cement return) 11,446.0 11,426.0 12/6/2023 09:00 12/6/2023 10:30 1.50 COMPZN, WELLPR CIRC P Install and pump wipper ball at 430gpm 920-1050psi 11,426.0 11,404.0 12/6/2023 10:30 12/6/2023 12:00 1.50 COMPZN, WELLPR SLPC P Slip and cut 126' drill line, Set block hight and COM 11,404.0 11,404.0 12/6/2023 12:00 12/6/2023 15:00 3.00 COMPZN, WELLPR TRIP P POOH from 11,404' MD racking back 4" drill pipe. 11,404.0 7,328.0 12/6/2023 15:00 12/6/2023 20:30 5.50 COMPZN, WELLPR PULD P POOH L/D 4" drill pipe singles from 7,328' MD to 3,927' MD. 7,328.0 3,927.0 12/6/2023 20:30 12/6/2023 21:00 0.50 COMPZN, WELLPR SVRG P Service rig and pipe skate 3,927.0 3,927.0 12/6/2023 21:00 12/7/2023 00:00 3.00 COMPZN, WELLPR PULD P POOH L/D 4" drill pipe singles from 3,927' MD to 2,176' MD. (high torque connections) 3,927.0 2,176.0 12/7/2023 00:00 12/7/2023 03:30 3.50 COMPZN, WELLPR PULD P Continue L/D 4" drill pipe from 2,176' MD to Surface, (high torque connections) L/D running tools (good shear on dog sub). 2,176.0 0.0 12/7/2023 03:30 12/7/2023 04:30 1.00 COMPZN, WELLPR BHAH P M/U Baker 7-5/8" scrapper assy 60.80'. 0.0 60.0 12/7/2023 04:30 12/7/2023 10:45 6.25 COMPZN, WELLPR TRIP P Continue TIH from 60' MD to 11,038' MD. 60.0 11,038.0 12/7/2023 10:45 12/7/2023 13:00 2.25 COMPZN, WELLPR WASH P Wash in hole from 11,038' MD to 11,442' MD. Tagged 3X with 5k at 11,442' MD. GPM: 420 PSI: 1230 PU: 185k SO: 160 ROT: 176k TRQ: 3k 11,038.0 11,442.0 12/7/2023 13:00 12/7/2023 14:00 1.00 COMPZN, WELLPR CIRC P Circulate BTM's up at 11,442' MD, Pump 50bbls spacer and displace well to 8.8ppg corrosion inhibited brine. GPM: 420 PSI: 1620 PU: 195k SO: 155 11,442.0 11,442.0 12/7/2023 14:00 12/7/2023 15:00 1.00 COMPZN, WELLPR OWFF P OWFF 30min (static). Prep to L/D doubles. CO PSI reg on Shot Pin Assy. 11,442.0 11,442.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 20/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/7/2023 15:00 12/8/2023 00:00 9.00 COMPZN, WELLPR PULD P POOH from 11,442' MD to 2,901' MD, L/D 102 / 4" drill pipe in doubles. Continue L/D singles. 11,442.0 2,901.0 12/8/2023 00:00 12/8/2023 03:45 3.75 COMPZN, WELLPR PULD P Continue POOH and L/D 4" DP singles from 2,901' MD to surface. 2,901.0 0.0 12/8/2023 03:45 12/8/2023 04:30 0.75 COMPZN, WELLPR OWFF P OWFF (Static). L/D Scrapper assy. (Very little material on magnets and nothing in bootbaskets). No cement observed on tools. 0.0 0.0 12/8/2023 04:30 12/8/2023 05:45 1.25 COMPZN, WELLPR WWWH P Blow down top drive and equipment. Pull wear ring and jet stack. 0.0 0.0 12/8/2023 05:45 12/8/2023 07:00 1.25 COMPZN, WELLPR PRTS P Test liner top to 3,500psi for 30min (good test). 0.0 0.0 12/8/2023 07:00 12/8/2023 07:30 0.50 COMPZN, RPCOMP RURD P R/U to run 4.5" 12.6ppf, L80, H563 upper completion. 0.0 0.0 12/8/2023 07:30 12/8/2023 09:00 1.50 COMPZN, RPCOMP PUTB P PJSM. RIH w/ upper completion. P/U HES downhole gauge assembly & test to 9,500psi for 5min - Good test. CPAI witness. 0.0 120.0 12/8/2023 09:00 12/8/2023 12:00 3.00 COMPZN, RPCOMP PUTB P RIH w/4.5" 12.6ppf, L80, H563 upper completion to 2,417' MD. Running TEC line and installing Cannon clamps every joint. Checking control line every 1000' MD. 120.0 2,417.0 12/8/2023 12:00 12/8/2023 18:00 6.00 COMPZN, RPCOMP PUTB P Continue RIH w/4.5" 12.6ppf, L80, H563 upper completion to 7,900' MD. Running TEC line and installing Cannon clamps every joint. Checking control line every 1000' MD. 2,417.0 7,900.0 12/8/2023 18:00 12/8/2023 22:00 4.00 COMPZN, RPCOMP PUTB P Continue RIH w/4.5" 12.6ppf, L80, H563 upper completion to 11,451' MD. Running TEC line and installing Cannon clamps every joint. Checking control line every 1000' MD. Land tubing at 11,451' MD, Witness locater sheared with 12k. PU: 175k SO: 138k Down hole pressure: 3764psi Down hole temp: 157° 7,900.0 11,451.0 12/8/2023 22:00 12/9/2023 00:00 2.00 COMPZN, RPCOMP OTHR P MU pup joints - 9.9', 9.8', 8.08', 5.78' and rerun joint #272. MU hanger and landing joint. Terminate line through hanger and test to 5,000psi - Good test. Land hanger with 138k. RILD. (3.36' above full located). Fill stack and flood lines. 11,411.0 11,451.0 12/9/2023 00:00 12/9/2023 00:30 0.50 COMPZN, RPCOMP PRTS P RU test equipment. Test hanger seals to 3000 psi for 5 min - Good test. 0.0 0.0 12/9/2023 00:30 12/9/2023 01:00 0.50 COMPZN, RPCOMP OTHR P Drop 1-5/16" ball and rod. 0.0 0.0 12/9/2023 01:00 12/9/2023 03:30 2.50 COMPZN, RPCOMP PRTS P RU test lines. Pressure up tubing, set packer and test tubing to 4,200 psi for 30 min. Bleed tubing down to 3,000 psi, bring pressure on IA to 4,200 psi and hold pressure for 30 min. Bleed tubing to 0 psi, shear SOV. Tubing and IA equalized and bled to 0 psi. Observed IA for flow for 30 min - No flow. 0.0 0.0 12/9/2023 03:30 12/9/2023 06:00 2.50 COMPZN, RPCOMP OTHR P Vac out BOP stack. Pull landing joint and install BPV. Pump down IA. Test BPV in direction of flow to 3,000 psi for 10 min 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 21/21 MT7-03 Report Printed: 1/2/2024 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/9/2023 06:00 12/9/2023 06:30 0.50 COMPZN, RPCOMP OTHR P Blow down all surface equipment. 0.0 0.0 12/9/2023 06:30 12/9/2023 07:30 1.00 COMPZN, RPCOMP RURD P De-Energize KOOMEY, Clean flow box and L/D mouse hole. 0.0 0.0 12/9/2023 07:30 12/9/2023 09:30 2.00 COMPZN, WHDBOP NUND P Remove trip nipple, break bolts on stack and remove choke and kill lines. Skid BOP's into STOW position. Remove risers. 0.0 0.0 12/9/2023 09:30 12/9/2023 12:00 2.50 COMPZN, WHDBOP NUND P HES terminate TEC line and install 10k adaptor flange. Torque adaptor, (test to 5k 10 min). Stage 10k tree in cellar. 0.0 0.0 12/9/2023 12:00 12/9/2023 14:00 2.00 COMPZN, WHDBOP NUND P N/U 10k frac tree and test to 9,600psi (good test). 0.0 0.0 12/9/2023 14:00 12/9/2023 18:00 4.00 COMPZN, WHDBOP FRZP P Pull BPV, R/U LRS, test lines to 3500 psi, Pump 50 bbls diesel down IA taking returns up tubing. Shut down and let U- Tube for one hour. IA: 0psi OA: 0psi TBG: 0psi 0.0 0.0 12/9/2023 18:00 12/9/2023 21:00 3.00 COMPZN, WHDBOP RURD P R/D all service lines and equipment. Secure well for MOB. 0.0 0.0 12/9/2023 21:00 12/10/2023 00:00 3.00 COMPZN, WHDBOP RURD P Clean pits and cellar area and tree, Install companion flanges and gauges. Clear 5k tree from rig floor. SIMOPS: Scope down derrick, Secure top drive, Unspool drill line, Blow down steam system and lower cattle chute. Rig release from MT7-03 RWO at 00:00 hrs 12-10-23. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By LAST TAG:MT7-03 jennalt Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason: Drop AU Darts to open 10 sleeves MT7-03 12/20/2023 claytg Notes: General & Safety Annotation End Date Last Mod By NOTE:jennalt Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread Conductor 20 19.12 39.8 120.0 120.0 94.00 Surface 13 3/8 12.42 39.8 3,523.4 3,056.9 68.00 L-80 H563 Intermediate 7 5/8 6.88 37.1 11,624.1 8,304.1 29.70 L80 Hyd563 Open Hole 6 1/2 12,375.9 21,050.0 8,175.6 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in) 37.2 37.2 0.00 EMERGENCY SLIPS Casing landed on emergency slips FMC Emergen cy Slips 6/29/2021 7.625 Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 12,375.9 8,405.2 86.93 Open Hole 6.500 HORIZONTAL, MT7-03, 1/2/2024 10:28:27 AM Vertical schematic (actual) Open Hole; 12,376.0-21,050.0 Production String 1 Cement; 11,446.0 ftKB Intermediate; 37.1-11,624.1 Primary – Full Bore; 11,050.0 ftKB Stage Cementing; 7,000.0 ftKB Surface; 39.8-3,523.4 Surface String Cement; 39.8 ftKB Conductor; 39.8-120.0 EMERGENCY SLIPS; 37.2 Hanger; 34.7 WNS INJ KB-Grd (ft) 39.90 RR Date 7/17/2021 Other Elev… MT7-03 ... TD Act Btm (ftKB) 21,050.0 Well Attributes Field Name RENDE Wellbore API/UWI 501032083000 Wellbore Status INJ Max Angle & MD Incl (°) 95.54 MD (ftKB) 19,972.21 WELLNAME WELLBOREMT7-03A Annotation LAST WO: End Date 12/9/2023 H2S (ppm) DateComment SSSV: NONE TT RR AA NN SS MM II TT TT AA LL FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 330 W. 7 th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: Schlumberger Wireline Backlog – Mooses Tooth DATE: 12/19/2023 Transmitted: North Slope, Mooses Tooth Unit Via hard drive data drop Moose's Tooth MT6-08 50-103-20772-00 218048_MT6-08_JetCutter_22Apr2022 218048_MT6-08_Puncher_02Feb2022 MT6-09 50-103-20779-00 218134_MT6-09_Puncher_18Feb2022 218134_MT6-09_SBHP_16Feb2022 218134_MT6-09_Tubing Cut_22Feb2022 MT7-01 50-10-320832-00 221052_MT7-01_Perf_29Oct2022 221052_MT7-01_PPROF_03Feb2023 MT7-02 50-103-20840-00 222026_MT7-02_ChemCut_21Dec2022 222026_MT7-02_Plug&Perf_17Apr2023 MT7-03 50-103-20830-00 221024_MT7-03_GR_12Aug23 221024_MT7-03_MechCutter_31Oct23 221024_MT7-03_RBP_1Nov23 MT7-05 50-103-20833-00 221087_MT7-05_PPROF_20Apr2023 221087_MT7-05_SCMT_25Dec2021 MT7-06 50-103-20831-00 221048_MT7-06_IBC-DSLT_04Oct2022 1of 3 Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com Receipt: Date: Alaska/IT-Support Services GGRE |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512 T38419 T38420 T38421 T38422 T38423 T38424 T38425 2/29/2024 MT7-03 50-103-20830-00 221024_MT7-03_GR_12Aug23 221024_MT7-03_MechCutter_31Oct23 221024_MT7-03_RBP_1Nov23 Kayla Junke Digitally signed by Kayla Junke Date: 2024.02.29 10:56:14 -09'00' January 16th, 2024 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Annular Disposal Reports, Fourth Quarter, 2023 To whom it may concern: Please find attached the fourth 2023 annular disposal report for Greater Moose’s Tooth Unit wells. These reports show the volumes disposed into surface casing by production casing annuli during fourth quarter of 2023. There were no disposal operations in the reporting period for MT7-03. Future sundries will follow for drilling operations on the MT7 Pad. Please call Jenna Taylor at 907-263-4522 should you have any questions. Sincerely, Jenna Taylor Senior Wells Analyst Attachments: MT7-03 10-423 MT7-02 10-423 Jenna Taylor Senior Wells Analyst Wells P. O. Box 100360 Anchorage, AK 99510-0360 Phone: 907-263-4749 221-024 7. Well Name: 5a. Sundry Number: 322-473, 323-206 10 (h)(1) drilling mud, drilling cuttings, reserve pit fluids cement-contaminated drilling mud, completion fluids, formation fluids and any necessary water added. (h)(2) drill rig wash fluids and drill rig domestic waste water (h)(3) Other Commission approved substances (include descriptions in block 12) Volume (bbls): Number of days disposal occurred: Disposal Beginning Dates: Disposal Ending Dates: Source Wells: Previous totals (bbls): 52964 9094 2291 64984 48 03/15/22 12/11/22 2023/Q1 0 0 0 0 0 2023/Q2 0 0 0 0 0 2023/Q3 0 560 181 741 1 2023/Q4 0 0 0 0 0 Total Ending Volume (bbls): 52964 9654 2472 65725 49.00 Other (Explain) 2. Address: 4b. Well Status: Oil Gas WAG 50-103-20830-00-00 MT7-03 PO Box 100360, Anchorage, Alaska Initial Disposal Continuation Final 4a. Well Class: Stratigraphic Service GINJ WINJ WDSPL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF ANNULAR DISPOSAL Development Exploratory 6. Permit to Drill Number: 8. API Number: 1. Operator: 5b. Sundry approval date: 4/12/2023 9. Field: Greater Mooses tooth3. (Check one box only) ConocoPhillips Alaska, Inc. Title: Wells Analyst Contact Phone: 907-263-4522Certified Signature: Contact Email: jenna.l.taylor@cop.com Report is due on the 20th of the month following the final month of the quarter. Ex: April 20 for the first quarter. The report will be submitted each quarter, even with zero volumes, until the application expires. Date of Revision: I hereby certify that the foregoing is true and correct to the best of my knowledge. Name: Jenna Taylor Revision? 12. Remarks and Approved Substances Description(s): 11. Attach Required Disposal Performance Data: Pressure vs. Time Step Rate Test No disposal in Q4 Form 10-423 Revised 3/2021 20 AAC 25.080(f) Submit in PDF format to aogcc.reporting@alaska.gov Digitally signed by Jenna Taylor DN: O=ConocoPhillips, CN=Jenna Taylor, E=jenna.l.taylor@gmail.com Reason: I am the author of this document Location: Date: 2024.01.19 12:35:51-09'00' Foxit PDF Editor Version: 13.0.0 Jenna Taylor 1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: ___________ ConocoPhillips Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 21050 feet 11469 feet true vertical 8176 feet N/A feet Effective Depth measured 11624 feet N/A feet true vertical 8304 feet N/A feet Perforation depth Measured depth N/A feet True Vertical depth N/A feet Tubing (size, grade, measured and true vertical depth)N/A Packers and SSSV (type, measured and true vertical depth)N/A 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Joseph Longo Contact Email:joseph.j.longo@conocophillips.com Authorized Title: Staff Drilling Engineer Contact Phone: 907-947-4323 Sr Pet Eng: Sr Pet Geo: Sr Res Eng: 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) WINJ WAG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Cement balanced plug: 11469' - 12492' MD. TOC 155' inside existing 7-5/8" casing | 43 bbls 16.5 ppg Class "G" 43 bbls 16.5 ppg Class "G" Balanced Plug Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Liner 4790 Production Intermediate 11624 7-5/8" 11624 8304 6890 Surface 3553 13-3/8" 3553 3076 5020 2260 Conductor 120 20" 120 120 Burst Collapse Structural Packer measured true vertical Casing Length Size MD TVD Cement Lab Reports Greater Mooses Tooth \ Rendezvous Plugs measured Junk measured 221-024 3. Address: P.O. Box 100360 Anchorage, Alaska, 99510-0360 50-103-20830-00-00 AA081800, AA081803, AA081781 MT7-03 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 2. Operator Name 4. Well Class Before Work: 5. Permit to Drill Number: Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Grace Christianson at 4:18 pm, Dec 11, 2023 Drill Pipe4" XT39 14 ppf S135CMT Stinger3-1/2" 8RD EUE 9.3 ppf L8016.5 ppg Class GKICK OFF PLUGIntermediate I Casing7-5/8" 29.7# L80 H563 x 7-5/8" 33.7# L80 TXPM11624' MD/ 8304' TVDSurface Casing13-3/8" 68# L80 H5633553' MD/ 3076' TVD Cemented to SurfaceLead: 11.0 ppg DeepCRETE | Tail: 15.8 ppg Class G1200'155' 868'TD 6-½” Production Section21050' MD/ 8176' TVDMT7-03Rig Workover - Single Lateral InjectorFINAL – CEMENT KOPRKB = 140.7’ AMSLJJLONGO - 12/11/2023Conformance Zone - 13830' MD16.5 ppg Gel PillKick off Plug TOC16.5 ppg Class GTOC - 11469' MDLCMKick off Plug - Base16.5 ppg Class G12492' MD Page 1/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/10/2023 00:00 11/11/2023 00:00 24.00 MIRU, MOVE MOB T Phase 3 condition. Wait on weather 0.0 0.0 11/11/2023 00:00 11/12/2023 00:00 24.00 MIRU, MOVE MOB T Phase 3 condition. Wait on weather 0.0 0.0 11/12/2023 00:00 11/12/2023 06:30 6.50 MIRU, MOVE MOB P Prep pad around MT7-03. Spot matting boards.Un hook interconnects. BD steam lines. Move ball mill. 0.0 0.0 11/12/2023 06:30 11/12/2023 14:00 7.50 MIRU, MOVE MOB P Lower cattle chute. Skid rig floor. LD derrick. Stomp modules back and ose trucks to pull down well row. 0.0 0.0 11/12/2023 14:00 11/13/2023 00:00 10.00 MIRU, MOVE MOB P Stomp out sub. Hook up jeep. Pull sub to MT7-03 and spot on rig mats. Stomp sub into position over MT7-03. 0.0 0.0 11/13/2023 00:00 11/13/2023 06:30 6.50 MIRU, MOVE MOB P Turn pipeshed. Spot in place.Pin pipe shed. Lay mats for csg shed. Spot csg shed. Spot pit module. Connect interconnects. 0.0 0.0 11/13/2023 06:30 11/13/2023 12:00 5.50 MIRU, MOVE MOB P Stomp pump module and motor module into place. Raise derrick. Skid rig floor. Spot ball mill. Hook up modules. Energize steam. 0.0 0.0 11/13/2023 12:00 11/13/2023 17:30 5.50 MIRU, MOVE MOB P Change out cable on cattle chute. Raise cattle chute. Raise chutes in pipe shed. Spool on drill line. Scope up derrick. 0.0 0.0 11/13/2023 17:30 11/13/2023 21:00 3.50 MIRU, MOVE MOB P Work on rig acceptance checklist. Test Gen/Hiline sync. Troubleshoot Amphion alarms. Test gas alarms. Accept rig @ 21:00hrs 11/13/23 0.0 0.0 11/13/2023 21:00 11/14/2023 00:00 3.00 MIRU, WELCTL RURD P Build hooch around cellar. Take on fluid to pis. C/O saver sub. Install belt guard on mud pump. 0.0 0.0 11/14/2023 00:00 11/14/2023 05:00 5.00 MIRU, WELCTL RURD P Change out saver sub.Install bails/clamps. Take on 8.8ppg VisBrine. MU squeeze manifold in celllar. line up to Frac tank. Initial pressures: IA - 640psi TBG - 640psi OA - 0psi 0.0 0.0 11/14/2023 05:00 11/14/2023 07:00 2.00 MIRU, WELCTL OWFF P Open IA to frac tank. Bleed off 100bbls (diesel) to frac tank. Final pressure 750psi. Line up TBG to frac tank. Bled from 720psi to 640psi. 0.0 0.0 11/14/2023 07:00 11/14/2023 10:00 3.00 MIRU, WELCTL CIRC P Line up and pump 275bbls 8.8ppg Vis Brine down TBG. Stage up to 6 BPM. Initial pressure: IA-1015psi/TBG-630psi Final pressure: IA-1620pis/TBG-365psi 0.0 0.0 11/14/2023 10:00 11/14/2023 12:00 2.00 MIRU, WELCTL CIRC P Line up and pump 325bbls 8.8ppg Vis Brine down IA. Stage up to 4 BPM. Initial pressure:IA-1160psi/TBG-vac. Final pressure: IA 620psi/TBG-220psi. 0.0 0.0 11/14/2023 12:00 11/14/2023 12:30 0.50 MIRU, WELCTL RURD P Flowcheck tubing and IA. Both on vac. Install BPV. 0.0 0.0 11/14/2023 12:30 11/14/2023 13:00 0.50 MIRU, WELCTL PRTS P Perform rolling test on BPV. 4 BPM final circulating pressure 550psi. No leaks observed. 0.0 0.0 11/14/2023 13:00 11/14/2023 15:00 2.00 COMPZN, WHDBOP NUND P ND tree and tbg head adapter, Install blanking plug in tbg hanger. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 2/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/14/2023 15:00 11/14/2023 22:00 7.00 COMPZN, WHDBOP NUND P NU BOPE and MPD equipment. 0.0 0.0 11/14/2023 22:00 11/15/2023 00:00 2.00 COMPZN, WHDBOP RURD P Install trip nipple. MU blank plug and XO. Perform BOP break in procedure. 0.0 0.0 11/15/2023 00:00 11/15/2023 02:00 2.00 COMPZN, WHDBOP RURD P Pull test joint. Remove master bushings. Seal up flow box. 0.0 0.0 11/15/2023 02:00 11/15/2023 02:45 0.75 COMPZN, WHDBOP RURD P MU BPA. Stage spooler to rig floor. Hook up super sucker and retrieve flashlight in BOPE stack. 0.0 0.0 11/15/2023 02:45 11/15/2023 04:45 2.00 COMPZN, WHDBOP BOPE P Attempt shell test. Observed leak. CO ring gasket in choke line. Shell test. Good. 0.0 0.0 11/15/2023 04:45 11/15/2023 06:00 1.25 COMPZN, WHDBOP BOPE P Testing BOPE. 0.0 0.0 11/15/2023 06:00 11/15/2023 14:45 8.75 COMPZN, WHDBOP BOPE T Test BOPE all test T/ 250 low for 5 min and 5,000 high for 10 min charted. W/ exception of annular T/ 250 low for 5 min and 3,500 high for 10 min. Manual operated & super choke tested T/2,000 psi charted, Test w/ 3 1/2" and 4 1/2" test joint.Test choke valves 1-15, manual operated & super choke, Choke & kill manuals, HCR's, 4" valves on kill line, 4" FOSV, 4" Dart valve, Upper and lower IBOP on TD; Blind/shear rams; Perform KOOMEY drawdown, ACC = 3000 PSI. MANIF. = 1500 PSI. ACC = 1800 PSI After all functions on bottles, 15 sec for 200 psi. Build W/ 2 Elec. pumps, 97 sec T/ Build full system. Pressure W/ 2 Elec. & 2 Air pumps, Closing times, Annular = 26 sec. UPR = 14 sec. Blind / Shears = 6 sec. LPR = 5 sec. Choke HCR = 2 sec. Kill HCR = 2 sec; Test PVT G/L and flow out alarms, Test LEL and H2S alarms. Witnessed by AOGCC Cam St John. BLM waived witness per Quinn Sawyer. 0.0 0.0 11/15/2023 14:45 11/15/2023 17:00 2.25 COMPZN, WHDBOP MPDA P RU and test MPD. 200psi low/1800psi high f/ 5/10min ea. Good test. 0.0 0.0 11/15/2023 17:00 11/15/2023 18:00 1.00 COMPZN, WHDBOP RURD P BD choke manifold/Kill line. PU 4.5" handling equipment, XO's. 0.0 0.0 11/15/2023 18:00 11/15/2023 19:30 1.50 COMPZN, WHDBOP OWFF P RU T-Bar. Check for flow below BPV. Flow observed. Decision made to Kill well pumping down tbg. 0.0 0.0 11/15/2023 19:30 11/15/2023 23:00 3.50 COMPZN, WHDBOP CIRC P Line up and pump down tbg @ 75 GPM. ICP-930psi/FCP 140psi. 4480stks 380bbls pumped. 0.0 0.0 11/15/2023 23:00 11/16/2023 00:00 1.00 COMPZN, WHDBOP OTHR P Drain BOPE stack w/ Super Sucker vac truck. 0.0 0.0 11/16/2023 00:00 11/16/2023 02:00 2.00 COMPZN, WHDBOP OWFF P Drain stack with Vac truck. Check for pressure below BPV. Observed flow. 0.0 0.0 11/16/2023 02:00 11/16/2023 05:30 3.50 COMPZN, WHDBOP OTHR P Discuss plan forward with office. 0.0 0.0 11/16/2023 05:30 11/16/2023 08:30 3.00 COMPZN, WHDBOP OTHR P Pump down tbg to kill well. Stage rate to 4 BPM. 7100stks 600bbls ICPs: TBG:615psi IA 235psi FCP: TBG: 615psi IA: 165psi 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 3/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/16/2023 08:30 11/16/2023 10:30 2.00 COMPZN, WHDBOP OTHR P Check for pressure below BPV.No pressure. Retrieve BPV. Monitor well. Loss rate at 90 BPH. 0.0 0.0 11/16/2023 10:30 11/16/2023 13:00 2.50 COMPZN, WHDBOP OTHR P Pump down IA and tbg. 1/2 BPM down tbg and 4 BPM down IA. 450 bbls. ICP: IA: 340psi FCP: IA: 930psi. 0.0 0.0 11/16/2023 13:00 11/16/2023 15:30 2.50 COMPZN, RPCOMP PULD P Back out lockdown screws. Pull tbg hanger to rig floor. 216k. LD landing joint,XOs and hanger. 0.0 0.0 11/16/2023 15:30 11/17/2023 00:00 8.50 COMPZN, RPCOMP PULD P POOH LD 4 1/2" tbg f/ 12376' to 7779'. 12,376.0 7,779.0 11/17/2023 00:00 11/17/2023 13:00 13.00 COMPZN, RPCOMP PULD P POOH LD 4 1/2" tbg f/ 7779' to surface. 7,779.0 0.0 11/17/2023 13:00 11/17/2023 14:30 1.50 COMPZN, WELLPR RURD P RD handling equipment. TEC spool. Clean and clear rig floor. 0.0 0.0 11/17/2023 14:30 11/17/2023 15:30 1.00 COMPZN, WELLPR RURD P Stage BHA to rig floor. RU 4" handling equipment. 0.0 0.0 11/17/2023 15:30 11/17/2023 16:15 0.75 COMPZN, WELLPR RURD P Install wear bushing. 0.0 0.0 11/17/2023 16:15 11/17/2023 16:45 0.50 COMPZN, WELLPR BHAH P PJSM. PU BHA 0.0 0.0 11/17/2023 16:45 11/17/2023 17:15 0.50 COMPZN, WELLPR SVRG P Service rig. Adjust link tilts. 0.0 0.0 11/17/2023 17:15 11/17/2023 19:00 1.75 COMPZN, WELLPR BHAH P PU and RIH w/ BHA to 291'. 0.0 291.0 11/17/2023 19:00 11/17/2023 23:00 4.00 COMPZN, WELLPR PULD P RIH w/ 6 1/2" BHA singling in w/ 4" DP f/ 291' to 2345'. 291.0 2,345.0 11/17/2023 23:00 11/18/2023 00:00 1.00 COMPZN, WELLPR CIRC P Shallow test MWD. Good test. 2,345.0 2,345.0 11/18/2023 00:00 11/18/2023 13:15 13.25 COMPZN, WELLPR PULD P RIH w/ 6 1/2" BHA singling in w/ 4" DP f/ 2345' to 11615'. SimOps: Test MPD lines. 2,345.0 11,202.0 11/18/2023 13:15 11/18/2023 14:30 1.25 COMPZN, WELLPR SLPC P Slip/Cut drill line. 11,202.0 11,202.0 11/18/2023 14:30 11/18/2023 15:00 0.50 COMPZN, WELLPR SVRG P Service Top Drive. 11,202.0 11,615.0 11/18/2023 15:00 11/18/2023 16:00 1.00 COMPZN, WELLPR MPDA P Retrieve trip nipple and install RCD bearing assembly. 11,615.0 11,615.0 11/18/2023 16:00 11/18/2023 16:45 0.75 COMPZN, WELLPR CIRC P Break circulation. Stage up pumps to 220 GPM/830 PSI. 40 RPM/10k TQ. 255k PU 125 SO 183k ROT 11,615.0 11,615.0 11/18/2023 16:45 11/18/2023 17:00 0.25 COMPZN, WELLPR PULD P RIH w/ 6 1/2" BHA singling in w/ 4" DP f/ 11615' to 11678'. Set down 25k @ 11678'. 11,615.0 11,678.0 11/18/2023 17:00 11/18/2023 19:00 2.00 COMPZN, WELLPR WASH P Wash down f/ 11678' to 12032'. 175 GPM 600PSI 11,678.0 12,032.0 11/18/2023 19:00 11/18/2023 21:00 2.00 COMPZN, WELLPR PULD P RIH w/ 6 1/2" BHA singling in w/ 4" DP f/ 12032' to 13171'. Obstruction encountered @ 13161'. 12,032.0 13,171.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 4/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/18/2023 21:00 11/18/2023 23:00 2.00 COMPZN, WELLPR REAM P Wash/Ream f/ 13171' to 13252'. 175 GPM 700 PSi 40 RPM 12k TQ 4-10k WOB Observed PSI spike and hi TQ. Decide to circulate BU. 13,171.0 13,251.0 11/18/2023 23:00 11/19/2023 00:00 1.00 COMPZN, WELLPR CIRC P Reciprocate string while CBU. 200 GPM 810 PSI 40 RPM 12k TQ 13,251.0 13,251.0 11/19/2023 00:00 11/19/2023 01:00 1.00 COMPZN, WELLPR CIRC P Reciprocate string while CBU. 200 GPM 810 PSI 40 RPM 12k TQ 13,251.0 13,251.0 11/19/2023 01:00 11/19/2023 05:00 4.00 COMPZN, WELLPR REAM P Wash/Ream f/ 13251' to 13350'. 200 GPM 800 PSi 40 RPM 14k TQ 185k ROT 13,251.0 13,350.0 11/19/2023 05:00 11/19/2023 07:30 2.50 COMPZN, WELLPR BKRM P Pack off @ 13350'. Work pipe. Re- establish circulation. Stage pumps back to 200 GPM. Unable to BROOH continuing to packoff. 13,350.0 13,350.0 11/19/2023 07:30 11/19/2023 10:00 2.50 COMPZN, WELLPR BKRM P Reduce pump rate to 84 GPM/300 PSI. BROOH to 13065'. Attempt to pull on elevators. Observed 30k OP. 13,350.0 13,065.0 11/19/2023 10:00 11/19/2023 13:00 3.00 COMPZN, WELLPR BKRM P BROOH f/ 13065' to 12573'. 13,065.0 12,573.0 11/19/2023 13:00 11/19/2023 14:30 1.50 COMPZN, WELLPR SMPD P SOOH f/ 12573' to 11615'. 12,573.0 11,615.0 11/19/2023 14:30 11/19/2023 15:15 0.75 COMPZN, WELLPR RURD P RU cementing line pump in assembly. 12,573.0 11,615.0 11/19/2023 15:15 11/19/2023 16:30 1.25 COMPZN, WELLPR CIRC P CBU. 220 GPM. 870 PSI. 12,573.0 11,615.0 11/19/2023 16:30 11/19/2023 17:00 0.50 COMPZN, WELLPR CIRC P Establish injection rates @ 2/3/4 BPM. 2BPM - 430psi SPP/182psi ANN 3BPM - 550psi SPP/210psi ANN 4BPM - 720psi SPP/260psi ANN 11,615.0 11,615.0 11/19/2023 17:00 11/19/2023 20:00 3.00 COMPZN, WELLPR CIRC P PJSM. Test lines to 4000psi. Pump 35bbls 11.0ppg spacer + 110bbls 14.5ppg Thixotropic cement + 60bbls 14.0ppg Thixotropic cement + 20bbls 11.0ppg spacer and 20bbls FW. Closed chokes as spacer exited bit and bull head to loss zone. Swap over to rig pumps and displace/bullhead 119bbls of 8.8ppg Vis Brine. 3 BPM FCP 1000psi on IA/614psi SPP 11,615.0 11,615.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 5/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/19/2023 20:00 11/19/2023 21:15 1.25 COMPZN, WELLPR SQEZ P SD f/ 5 minutes Squeeze 10bbls @ 1BPM - SPP 520psi/IA 380psi SD f/ 10 minutes. Squeeze 10bbls @ 1 BPM - SPP 375psi/IA 230psi SD f/ 10 minutes. Squeeze 10bbls @ 1 BPM - SPP 195psi/IA 4psi. SD f/ 10 minutes. Cement in place @ 21:15hrs 11/19/23 11,615.0 11,615.0 11/19/2023 21:15 11/19/2023 21:45 0.50 COMPZN, WELLPR SMPD P SOOH 5 stds to 11170'. 11,615.0 11,170.0 11/19/2023 21:45 11/20/2023 00:00 2.25 COMPZN, WELLPR CIRC P Stage up rates to 5 BPM. Check tools. All good. Pump 40bbl sugar water pill + 30 bbl HiVis pill. Chase pills w/ DS volume. loss rate: 2 BPM 35 BPH 4 BPM 75 BPH. 11,170.0 11,170.0 11/20/2023 00:00 11/20/2023 06:00 6.00 COMPZN, WELLPR WOC P Waiting on cement. Circulate across top of hole. Losses 25-30 BPH. SimOPs: Adjust link tilt. Grease crown and blocks. Troubleshoot electrical issue from rig maintenance. 11,170.0 11,170.0 11/20/2023 06:00 11/20/2023 09:00 3.00 COMPZN, WELLPR WOC P Waiting on cement. Break circulation and stage up to 200 GPM. Tools all working. Static losses 25-30 BPH. 11,170.0 11,170.0 11/20/2023 09:00 11/20/2023 10:00 1.00 COMPZN, WELLPR SMPD P Strip in hole to 11645'. 11,170.0 11,645.0 11/20/2023 10:00 11/20/2023 13:30 3.50 COMPZN, WELLPR RGRP T Troubleshoot VFD Chopper Issues. 11,645.0 11,645.0 11/20/2023 13:30 11/20/2023 15:45 2.25 COMPZN, WELLPR REAM P Ream in hole f/ 11645' to 12212'. 48 GPM 310 PSI 20 RPM 13k TQ 11,645.0 12,212.0 11/20/2023 15:45 11/20/2023 17:00 1.25 COMPZN, WELLPR CIRC P Circulate BU 200 GPM 840 PSI 40 RPM 14k TQ 12,212.0 12,212.0 11/20/2023 17:00 11/20/2023 21:30 4.50 COMPZN, WELLPR CIRC P Circulate 84 GPM 260 PSI 20 RPM 16k TQ 12,212.0 12,212.0 11/20/2023 21:30 11/21/2023 00:00 2.50 COMPZN, WELLPR CIRC T Take baseline parameters for opening well commander. Drop 1.75" openng ball. Pump down @ 2 BPM. No indications of ball landing in seat after pumping 50bbls over calculated strokes. Continue pumping. Work drill pipe. Vary RPMs. No indications ball seated. 12,212.0 12,212.0 11/21/2023 00:00 11/21/2023 01:30 1.50 COMPZN, WELLPR CIRC T Continue Adjusting parameters to shift well commander open. No success. Ream back down to 12212' 12,212.0 12,212.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 6/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/21/2023 01:30 11/21/2023 03:00 1.50 COMPZN, WELLPR CIRC P Pump 10 bbls spacer + 20 bbls 16.5ppg Gel pill + 10 bbls spacer. Displace with 130bbls 8.8 Vis Brine. Close chokes and bullhead into OH. Final circulating pressure SPP 1177 psi/IA 675 psi. 12,212.0 12,212.0 11/21/2023 03:00 11/21/2023 04:15 1.25 COMPZN, WELLPR SMPD P SOOH to inside casing @ 11568'. 12,212.0 11,568.0 11/21/2023 04:15 11/21/2023 05:00 0.75 COMPZN, WELLPR MPDA P Flow check. Retrieve RCD bearing assembly and install trip nipple. 12,212.0 11,568.0 11/21/2023 05:00 11/21/2023 05:30 0.50 COMPZN, WELLPR OWFF P Establish static loss rate. 15 BPH 11,568.0 11,568.0 11/21/2023 05:30 11/21/2023 06:00 0.50 COMPZN, WELLPR CIRC P Pump slug and blow down top drive. 11,568.0 11,568.0 11/21/2023 06:00 11/21/2023 08:30 2.50 COMPZN, WELLPR TRIP P Drop 2.5" drift w/ tail. POOH f/ 11568' to 7196'. 11,568.0 7,196.0 11/21/2023 08:30 11/21/2023 09:00 0.50 COMPZN, WELLPR RURD P Found 2.50" drift tail in Std #73. LD singles and retrieved drift in top of Std #72. Observed residual cement in STD. MU singles and drop 2.14" drift w/ tail in string. 7,196.0 7,196.0 11/21/2023 09:00 11/21/2023 12:00 3.00 COMPZN, WELLPR P POOH f/ 7196' to 1945' 7,196.0 1,945.0 11/21/2023 12:00 11/21/2023 12:30 0.50 COMPZN, WELLPR OWFF P Establish static loss rate. 21 BPH 1,945.0 1,945.0 11/21/2023 12:30 11/21/2023 14:00 1.50 COMPZN, WELLPR TRIP P TOOH f/ 1945' to 200'. 1,945.0 200.0 11/21/2023 14:00 11/21/2023 14:15 0.25 COMPZN, WELLPR OWFF P Flow check. Slow loss. PJSM f/ BHA 200.0 200.0 11/21/2023 14:15 11/21/2023 15:30 1.25 COMPZN, WELLPR BHAH P LD BHA. 200.0 0.0 11/21/2023 15:30 11/21/2023 16:00 0.50 COMPZN, WELLPR CLEN P Clean and clear rig floor. Stage Tbg handling equipment. 0.0 0.0 11/21/2023 16:00 11/21/2023 17:00 1.00 COMPZN, WELLPR RURD P RU 3 1/2" Tbg handling equipment. 0.0 0.0 11/21/2023 17:00 11/21/2023 19:00 2.00 COMPZN, WELLPR PULD P PJSM. RIH w/ 3 1/2" cementing stinger. 0.0 1,230.0 11/21/2023 19:00 11/21/2023 19:45 0.75 COMPZN, WELLPR RURD P MU XO. RD tbg handling equipment. 1,230.0 1,230.0 11/21/2023 19:45 11/22/2023 00:00 4.25 COMPZN, WELLPR TRIP P RIH w/ 3 1/2" cement stinger on 4" DP f/ 1230' to 10219'. 1,230.0 10,219.0 11/22/2023 00:00 11/22/2023 00:45 0.75 COMPZN, WELLPR TRIP P RIH f/ 10219' to 11546'. 10,219.0 11,546.0 11/22/2023 00:45 11/22/2023 01:15 0.50 COMPZN, WELLPR RURD P Flow check. Retrieve trip nipple. Install RCD bearing assembly. 11,546.0 11,546.0 11/22/2023 01:15 11/22/2023 03:00 1.75 COMPZN, WELLPR CIRC P Establish loss rates @ 4 BPM. 24 BPH. Obtain baseline parameters @ 2BPM. 257k PU 145k SO 182k ROT 10.5k TQ @ 10 RPM 11.5k TQ @ 15 RPM 11.7k TQ @ 20 RPM 11,546.0 11,546.0 11/22/2023 03:00 11/22/2023 03:30 0.50 COMPZN, WELLPR TRIP P RIH f/ 11546' to 12205' 11,546.0 12,205.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 7/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/22/2023 03:30 11/22/2023 05:45 2.25 COMPZN, WELLPR REAM P Wash/Ream in hole f/ 12205' to 12405'. Observe taking weight @ 12405'. Work string and wash down to 12492'. 84 GPM 200 PSI 20 RPM 13/14k TQ 180k ROT 12,205.0 12,492.0 11/22/2023 05:45 11/22/2023 10:00 4.25 COMPZN, WELLPR CIRC P Stage pumps to 210 GPM and circulate 3 BU. Rotate and reciprocate pipe. 210 GPM 491 PSI 12,492.0 12,492.0 11/22/2023 10:00 11/22/2023 12:00 2.00 COMPZN, WELLPR CIRC P Establish injection rates. Pump 100bbl LCM pill + 10bbl spacer + 20bbls 16.5ppg Gel pill + 10bbls spacer. Chase w/ 116bbls 8.8ppg Vis Brine. Close chokes and bullhead as LCM pill exits bit. FCP: SPP - 750psi IA - 1060psi 12,492.0 12,492.0 11/22/2023 12:00 11/22/2023 13:30 1.50 COMPZN, WELLPR RURD P RU cementing assembly. PJSM. Circulate @ 1 BPM/55PSI. 12,492.0 12,492.0 11/22/2023 13:30 11/22/2023 15:00 1.50 COMPZN, WELLPR CMNT P Flood lines and test to 3800psi. Good test. Pump 30bbls 13.0ppg mudpush spacer + 43bbls 16.5ppg G cement + 11bbls 13.0ppg mud push spacer. Displace w/ 99 bbls 8.8ppg Vis Brine. 12,492.0 12,492.0 11/22/2023 15:00 11/22/2023 15:30 0.50 COMPZN, WELLPR RURD P RD cementing assembly and BD lines. 12,492.0 12,492.0 11/22/2023 15:30 11/22/2023 17:30 2.00 COMPZN, WELLPR BKRM P BROOH f/ 12492' to 11357'. Observed several overpulls. Worked through. 1/4 BPM 10 RPM 8k TQ 12,492.0 11,357.0 11/22/2023 17:30 11/22/2023 20:00 2.50 COMPZN, WELLPR CIRC P Load nerf ball in DS. Circulate BU x 2. Observed soft cement/Gel/LCM across shakers at 1/3 of first BU. Dumped a total of 387 bbls of contaminated returns. Established loss rate after circulating BU. 6 BPH. 168 GPM 600 PSI 20 RPM 10k TQ. 11,357.0 11,357.0 11/22/2023 20:00 11/22/2023 20:45 0.75 COMPZN, WELLPR MPDA P Retrieve RCD bearing assembly and install trip nipple. 11,357.0 11,357.0 11/22/2023 20:45 11/23/2023 00:00 3.25 COMPZN, WELLPR TRIP P POOH f/ 11357' to 6716'. 11,357.0 6,716.0 11/23/2023 00:00 11/23/2023 03:00 3.00 COMPZN, WELLPR TRIP P POOH f/ 6716' to 1230' 6,716.0 1,230.0 11/23/2023 03:00 11/23/2023 03:30 0.50 COMPZN, WELLPR RURD P Flow check. RU tbg handling equipment. 1,230.0 1,230.0 11/23/2023 03:30 11/23/2023 06:00 2.50 COMPZN, WELLPR PULD P POOH LD 3 1/2" tbg f/ 1230' to surface. 1,230.0 0.0 11/23/2023 06:00 11/23/2023 06:45 0.75 COMPZN, WELLPR RURD P RD tbg handling equipment. Clean and clear rig floor. 0.0 0.0 11/23/2023 06:45 11/23/2023 09:00 2.25 COMPZN, DRILLOUT BHAH P PJSM. MU and RIH w/ 6 1/2" kick off BHA. 0.0 318.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 8/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/23/2023 09:00 11/23/2023 11:00 2.00 COMPZN, DRILLOUT TRIP P RIH w/ 6 1/2" kick off BHA to 2633'. 318.0 2,633.0 11/23/2023 11:00 11/23/2023 11:30 0.50 COMPZN, DRILLOUT SVRG P Service Rig. 2,633.0 2,633.0 11/23/2023 11:30 11/23/2023 13:00 1.50 COMPZN, DRILLOUT RGRP T Change out switch on Top drive. 2,633.0 2,633.0 11/23/2023 13:00 11/23/2023 18:00 5.00 COMPZN, DRILLOUT TRIP P RIH w/ 6 1/2" kick off f/ 2633' to 11340'. 2,633.0 11,340.0 11/23/2023 18:00 11/23/2023 19:00 1.00 COMPZN, DRILLOUT SLPC P Slip/Cut drillline. 11,340.0 11,340.0 11/23/2023 19:00 11/23/2023 19:30 0.50 COMPZN, DRILLOUT SVRG P Service rig. 11,340.0 11,340.0 11/23/2023 19:30 11/23/2023 20:30 1.00 COMPZN, DRILLOUT WASH P Break circulation and wash down f/ 11340'. Set down 15k @ 11469'. 200 GPM 1550PSI 11,340.0 11,469.0 11/23/2023 20:30 11/23/2023 22:00 1.50 COMPZN, DRILLOUT REAM P Wash/Ream f/ 11469' to 11644'. (20' below shoe). 200 GPM 1550PSI XX RPM 14-15k TQ. 11,469.0 11,644.0 11/23/2023 22:00 11/24/2023 00:00 2.00 COMPZN, DRILLOUT CIRC P Circulate BU and back ream into shoe to 11626' 200 GPM 1480 PSI 60 RPM 13k TQ. 11,644.0 11,626.0 11/24/2023 00:00 11/24/2023 00:30 0.50 COMPZN, DRILLOUT CIRC T Circulate BU and back ream into shoe to 11626' 200 GPM 1480 PSI 60 RPM 13k TQ. 11,626.0 11,626.0 11/24/2023 00:30 11/24/2023 02:15 1.75 COMPZN, DRILLOUT FIT P RU and perform shoe test to 12.1ppg EMW. RD test equipment. 11,626.0 11,626.0 11/24/2023 02:15 11/24/2023 03:15 1.00 COMPZN, DRILLOUT REAM P Wash/Ream f/ 11626' to 11720'. 200 GPM 1550 PSI 60 RPM 13k TQ 182k ROT 11,626.0 11,720.0 11/24/2023 03:15 11/24/2023 09:00 5.75 COMPZN, DRILLOUT DRLG P Reciprocate and ream to build trough for side track. 11720' to 11682'. 200 GPM 1550 PSi 60-80 RPM 13k TQ 182k ROT 11,720.0 11,720.0 11/24/2023 09:00 11/24/2023 18:00 9.00 COMPZN, DRILLOUT DRLG P Time driill f/ 11720' to 11731'. 200 GPM 1550 PSI 80 RPM 13-14k TQ 188 ROT 11,720.0 11,731.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 9/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/24/2023 18:00 11/25/2023 00:00 6.00 COMPZN, DRILLOUT DRLG P Time driill f/ 11731' to 11758'. 200 GPM 1550 PSI 80 RPM 13-14k TQ 188 ROT 11,731.0 11,758.0 11/25/2023 00:00 11/25/2023 02:30 2.50 COMPZN, DRILLOUT DDRL P Time drill f/ 11758' to 11806'. 200 GPM 1530 PSI 80 RPM 13-14k TQ. 11,758.0 11,806.0 11/25/2023 02:30 11/25/2023 03:00 0.50 COMPZN, DRILLOUT CIRC P Take survey. Drift Sidetrack f/ 11720' to 11806'. Set down 15k to confirm new hole. 11,806.0 11,806.0 11/25/2023 03:00 11/25/2023 05:00 2.00 COMPZN, DRILLOUT CIRC P Pump out of hole to 11695'. BROOH f/ 11695' to 11622' while circulating BU. 200 GPM 1530 PSI 20 RPM 13-14k TQ 188k ROT 11,806.0 11,622.0 11/25/2023 05:00 11/25/2023 05:30 0.50 COMPZN, DRILLOUT OWFF P Flow check. Static. Pump slug. Blow down Top Drive. 11,622.0 11,622.0 11/25/2023 05:30 11/25/2023 11:45 6.25 COMPZN, DRILLOUT TRIP P POOH to BHA at 270'. 11,622.0 270.0 11/25/2023 11:45 11/25/2023 12:30 0.75 COMPZN, DRILLOUT OWFF P Flow check. Static. Pull PS-21s and install master bushings. 270.0 270.0 11/25/2023 12:30 11/25/2023 14:00 1.50 COMPZN, DRILLOUT BHAH P LD BHA. 270.0 0.0 11/25/2023 14:00 11/25/2023 15:00 1.00 COMPZN, DRILLOUT CIRC P Function rams and jet BOPE. 0.0 0.0 11/25/2023 15:00 11/25/2023 15:30 0.50 COMPZN, DRILLOUT CLEN P Clean and clear rig floor. 0.0 0.0 11/25/2023 15:30 11/26/2023 00:00 8.50 COMPZN, DRILLOUT BOPE P Test BOPE all test T/ 250 low for 5 min and 5,000 high for 10 min charted. W/ exception of annular T/ 250 low for 5 min and 2,500 high for 10 min w/ 4" test joint. Manual operated & super choke tested T/2,000 psi charted, Test w/ 4" and 4 1/2" test joint.Test choke valves 1- 15, manual operated & super choke, Choke & kill manuals, HCR's, 4" valves on kill line, 4" FOSV, 4" Dart valve, Upper and lower IBOP on TD; Blind/shear rams; Perform KOOMEY drawdown, ACC = 3000 PSI. MANIF. = 1500 PSI. ACC = 1800 PSI After all functions on bottles, 17 sec for 200 psi. Build W/ 2 Elec. pumps, 97 sec T/ Build full system. Pressure W/ 2 Elec. & 2 Air pumps, Closing times, Annular = 27 sec. UPR = 6 sec. Blind / Shears = 5 sec. LPR = 5 sec. Choke HCR = 2 sec. Kill HCR = 2 sec; Test PVT G/L and flow out alarms, Test LEL and H2S alarms. Witnessed by AOGCC Sean Sullivan . BLM waived witness per Quinn Sawyer. 0.0 0.0 11/26/2023 00:00 11/26/2023 01:00 1.00 COMPZN, DRILLOUT BOPE P Test LPRs and manual chokes. 250/5000 PSI 5min low/10min high. 0.0 0.0 11/26/2023 01:00 11/26/2023 02:00 1.00 COMPZN, DRILLOUT RURD P Pull test plug/RD test equipment. Install wear bushing and lock down. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 10/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/26/2023 02:00 11/26/2023 05:00 3.00 COMPZN, DRILLOUT BHAH P MU and RIH w/ 6 1/2" production BHA. 0.0 318.0 11/26/2023 05:00 11/26/2023 06:30 1.50 COMPZN, DRILLOUT TRIP P RIH f/ 318' to 790'. Rattling DP to remove cement. Decision made to POOH. 318.0 790.0 11/26/2023 06:30 11/26/2023 07:00 0.50 COMPZN, DRILLOUT TRIP T POOH to BHA. 790.0 318.0 11/26/2023 07:00 11/26/2023 08:30 1.50 COMPZN, DRILLOUT BHAH T Rack back majority of BHA. Remove source. 318.0 0.0 11/26/2023 08:30 11/26/2023 12:00 3.50 COMPZN, DRILLOUT TRIP T MU open ended 4" mule shoe and RIH w/ 4" DP to 6146'. Rattling each joint with hammer to dislodge cement. Observed cement coming out stds 1-13. 0.0 6,146.0 11/26/2023 12:00 11/26/2023 12:30 0.50 COMPZN, DRILLOUT SVRG T Service rig. (Power surge blacked out rig trounbleshoot). 6,146.0 6,146.0 11/26/2023 12:30 11/26/2023 13:00 0.50 COMPZN, DRILLOUT RGRP T Troubleshoot power surge that blacked out rig. 6,146.0 6,146.0 11/26/2023 13:00 11/26/2023 16:00 3.00 COMPZN, DRILLOUT TRIP T RIH w/ 4" DP f/ 6146' to 11542'. 6,146.0 11,542.0 11/26/2023 16:00 11/26/2023 17:30 1.50 COMPZN, DRILLOUT CIRC T Pump 50 bbl 8.8ppg BiCarb pill and circulate surface to surface to clean drill pipe. 500 GPM 1920 PSI 11,542.0 11,542.0 11/26/2023 17:30 11/26/2023 18:00 0.50 COMPZN, DRILLOUT OWFF T Flow check and blow down Top drive. 11,542.0 11,542.0 11/26/2023 18:00 11/27/2023 00:00 6.00 COMPZN, DRILLOUT TRIP T POOH f/ 11542' to 3200'. 11,542.0 3,200.0 11/27/2023 00:00 11/27/2023 00:30 0.50 COMPZN, DRILLOUT TRIP T POOH f/ 3200' to 2076'. 3,200.0 2,076.0 11/27/2023 00:30 11/27/2023 03:30 3.00 COMPZN, DRILLOUT PULD T POOH LD 4" DP f/ 2076' to HWDP. 3,200.0 180.0 11/27/2023 03:30 11/27/2023 04:30 1.00 COMPZN, DRILLOUT PULD T POOH LD 4" HWDP. Inspect and drift. MU and rack back. 180.0 0.0 11/27/2023 04:30 11/27/2023 06:30 2.00 PROD1, DRILL BHAH T RIH w/ 6 1/2" production BHA. 0.0 318.0 11/27/2023 06:30 11/27/2023 10:00 3.50 PROD1, DRILL TRIP P RIH w/ 6 1/2" production BHA f/ 318' to 2211'. 318.0 2,211.0 11/27/2023 10:00 11/27/2023 10:30 0.50 PROD1, DRILL CIRC P Shallow test smart tools. Good test. 2,211.0 2,210.0 11/27/2023 10:30 11/27/2023 16:30 6.00 PROD1, DRILL TRIP P RIH f/ 2210' to 11487'. 2,210.0 11,487.0 11/27/2023 16:30 11/27/2023 18:00 1.50 PROD1, DRILL SLPC P Slip/Cut drill line. SimOps: Circulate at 100 GPM. 11,487.0 11,487.0 11/27/2023 18:00 11/27/2023 18:30 0.50 PROD1, DRILL SVRG P Service top drive. 11,487.0 11,487.0 11/27/2023 18:30 11/27/2023 19:00 0.50 PROD1, DRILL CIRC P Bring pumps up to drilling rate and check tools. All good. 11,487.0 11,487.0 11/27/2023 19:00 11/27/2023 20:00 1.00 PROD1, DRILL SMPD P Retrieve trip nipple and install RCD bearing assembly. 11,487.0 11,487.0 11/27/2023 20:00 11/27/2023 21:00 1.00 PROD1, DRILL REAM P Wash/Ream f/ 11487' to 11806'. 100-200 GPM 370-1000 PSI 30-100 RPM 12-15k TQ. 11,487.0 11,806.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 11/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/27/2023 21:00 11/28/2023 00:00 3.00 PROD1, DRILL DDRL P Drill 11806' to 11887'. Displace to 8.8ppg FloPro Lite while drilling. 5-10k WOB 200 GPM 950 PSI 100-120 RPM 7k TQ 9.3ppg ECD 217k PU 160k SO 190k ROT 11,806.0 11,887.0 11/28/2023 00:00 11/28/2023 06:00 6.00 PROD1, DRILL DDRL P Drill 11887' to 12438'. 15k WOB 230 GPM 1187 PSI 120 RPM 8k TQ 9.5ppg ECD 203k PU 167k SO 180k ROT 11,806.0 12,438.0 11/28/2023 06:00 11/28/2023 12:00 6.00 PROD1, DRILL DDRL P Drill 12438' to 13005 MD'/ 8413' TVD. 15k WOB 230 GPM 1250 PSI 130 RPM 7k TQ 9.5ppg ECD 204k PU 164k SO 183k ROT 12,438.0 13,005.0 11/28/2023 12:00 11/28/2023 18:00 6.00 PROD1, DRILL DDRL P Drill 13005' to 13628' MD'/ 8396' TVD. Observed losses @ 13570'. 15k WOB 230 GPM 1187 PSI 130 RPM 7k TQ 9.6ppg ECD 205k PU 160k SO 185k ROT 13,005.0 13,628.0 11/28/2023 18:00 11/28/2023 19:00 1.00 PROD1, DRILL CIRC P Initial loss rate 130-140 BPH. Pump 50 bbls of 35 ppb LCM pill. Loses decreased to 60-70 BPH before LCM exited bit and then decreased to 20-30 BPH. Note: Slow pump rate and turn off tools before pill made it to smart tools. 13,628.0 13,628.0 11/28/2023 19:00 11/29/2023 00:00 5.00 PROD1, DRILL DDRL P Drill 13628' to 14184' MD'/ 8396' TVD. Adding 10bbls of 35ppb per std to active as background LCM. Losses 25-40 BPH 15k WOB 230 GPM 1345 PSI 120 RPM 7k TQ 9.7ppg ECD 205k PU 160k SO 190k ROT 13,628.0 14,184.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 12/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/29/2023 00:00 11/29/2023 03:30 3.50 PROD1, DRILL DDRL P Drill 14184' to 14592' MD'/ 8427' TVD. Went on 70-90 BPH losses @ 14483'. Pump 50bbls of 35ppb LCM pill. 15k WOB 230 GPM 1345 PSI 120 RPM 7k TQ 9.7ppg ECD 205k PU 160k SO 190k ROT 14,184.0 14,592.0 11/29/2023 03:30 11/29/2023 04:15 0.75 PROD1, DRILL CIRC P PU off bottom and slow rates to keep tools off as LCM passed through BHA. Losses decreasing to 40-50 BPH. 130 GPM 570 PSI 80 RPM 5k TQ 14,592.0 14,592.0 11/29/2023 04:15 11/29/2023 06:30 2.25 PROD1, DRILL DDRL P Drill 14592' to 14803' MD'/ 8363' TVD. Went on total losses @ 14625'.Line up pump on annulus @ 1bpm to keep hole full. 15k WOB 230 GPM 1345 PSI 120 RPM 7k TQ 9.4ppg ECD 205k PU 160k SO 190k ROT SimOps: Building LCM pill. 14,592.0 14,803.0 11/29/2023 06:30 11/29/2023 08:00 1.50 PROD1, DRILL BKRM T BROOH f/ 14803' to 14517'. Pumping down annulus @ 3 BPM to keep hole full. 200 GPM 930 PSI 80 RPM 4k TQ SimOps: Building LCM pill. 14,803.0 14,517.0 11/29/2023 08:00 11/29/2023 10:15 2.25 PROD1, DRILL CIRC T Drop 1.75" WC opening ball and pump down at 2 BPM. Landed @ 980 stks. Shifted open @ 1357 PSI. Drop Isolation ball and pump down @ 2 BPM. SimOps: Building LCM pill. 14,517.0 14,517.0 11/29/2023 10:15 11/29/2023 14:00 3.75 PROD1, DRILL CIRC T Pump 100 BBLs of 100 PPB LCM pill. With 30 BBLs of pill out of WC observed returns. Start applying back pressure w/ MPD chokes. 200 PSI backpressure and 400 PSI on DP @ 2 BPM. Continue squeezing LCM pill. Losses deceased to 40 BPH. Drop 1.75" WC closing ball and pump down @ 2 BPM/240 PSI. Ball landed @ 965 STKs and shifted close @ 1432 PSI. Stage up rates and verify tools on. 14,517.0 14,517.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 13/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/29/2023 14:00 11/29/2023 15:00 1.00 PROD1, DRILL WASH T Wash in hole f/ 14517' to 14803'. 160-230 GPM 790-1300 PSI 14,517.0 14,803.0 11/29/2023 15:00 11/29/2023 19:00 4.00 PROD1, DRILL DDRL P Drill 14803' to 15182' MD'/ 8358' TVD. Closing choke on connections. 0 PSI build. 15k WOB 230 GPM 1345 PSI 120 RPM 7k TQ 9.4ppg ECD 205k PU 160k SO 190k ROT Losses: 70-120 BPH 14,803.0 15,182.0 11/29/2023 19:00 11/29/2023 21:00 2.00 PROD1, DRILL BKRM T BROOH f/ 15182' to 14517' 185 GPM 1150 PSI 80 RPM 6k TQ 15,182.0 14,517.0 11/29/2023 21:00 11/29/2023 23:00 2.00 PROD1, DRILL CIRC T Obtain base parameters. Drop 1.75" WC opening ball. Pump down @ 2 BPM/315 PSI. Landed @ 847stks. Shifted @ 1733 PSI. Stage up rates and confirm WC open. Drop 1.698" Isolation ball and pump down @ 3 BPM 375 PSI. 14,517.0 14,517.0 11/29/2023 23:00 11/30/2023 00:00 1.00 PROD1, DRILL CIRC T Pump 100 BBLs 25 ppb Gel pill followed by 100 BBLs of 100ppb LCM pill. 3 BPM 375 PSI 5 RPM 6k TQ. 14,517.0 14,517.0 11/30/2023 00:00 11/30/2023 01:30 1.50 PROD1, DRILL CIRC T Continue pumping pills. Close chokes as pill exits WC. Bullhead pills below bit decreasing rate from 120 GPM to 80 GPM as pressure increases. SD and monitor pressures. Bled down to 0 PSI. 120-80 GPM 340 PSI final MPD pressure. 545 PSI final SPP 14,517.0 14,517.0 11/30/2023 01:30 11/30/2023 03:30 2.00 PROD1, DRILL OWFF T BROOH one std to 14422'. Pump across top of hole and establish static loss rate. 45 BPH. 14,517.0 14,422.0 11/30/2023 03:30 11/30/2023 04:00 0.50 PROD1, DRILL CIRC T Pump 1.75" WC closing ball down @ 2 BPM. Landed @ 930 STKS. Shifted close @ 1460 PSI. 14,422.0 14,422.0 11/30/2023 04:00 11/30/2023 06:00 2.00 PROD1, DRILL CIRC T Stage pumps up to 200 GPM and confirm tools working. Establish dynamic loss rate. 72 BPH. SD and pump across top of hole monitoring loss rates. 14,422.0 14,422.0 11/30/2023 06:00 11/30/2023 09:30 3.50 PROD1, DRILL WAIT T Circulate across top of hole monitoring losses while waiting on cement swivel to arrive. 14,422.0 14,422.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 14/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/30/2023 09:30 11/30/2023 13:30 4.00 PROD1, DRILL BKRM T BROOH f/ 14422' to 13000'. 190 GPM 930 PSI 40 RPM 6k TQ 180k ROT 14,422.0 13,000.0 11/30/2023 13:30 11/30/2023 14:00 0.50 PROD1, DRILL CIRC T Stage up to 200 GPM and establish loss rates. 84 BPH 200 GPM 990 PSI 5 RPM 5k TQ 13,000.0 13,000.0 11/30/2023 14:00 11/30/2023 14:30 0.50 PROD1, DRILL RURD T RU cement swivel and cement line. 13,000.0 13,000.0 11/30/2023 14:30 11/30/2023 15:00 0.50 PROD1, DRILL CIRC T Establish injection rates. 2 BPM - 300 PSI SPP/0PSI IA 3 BPM - 598 PSI SPP/300 PSI IA. 4 BPM - 930 PSi SPP/345 PSI IA 13,000.0 13,000.0 11/30/2023 15:00 11/30/2023 17:30 2.50 PROD1, DRILL CMNT T PJSM. Pump 5 BBLs FW. Test lines to 3500 PSI. Mix and pump 30 BBLs 11.0 PPG Mud Push spacer + 125 BBLs 14.0 PPG Thixotropic cement + 21 BBLs 11.0 PPG Mud Push spacer. Chase w/ 20 BBLs FW. (Closed chokes and bullhead at 100 BBLs away). Swap over to rig pumps and bullhead w/ 115 BBLs 8.8 PPG FloPro. SD and monitor pressure. Bled to 0 PSI. Cement in place @ 17:30 hrs 11/30/23 3 BPM 38-945 PSI SPP 320-472 PSI IA 13,000.0 13,000.0 11/30/2023 17:30 11/30/2023 18:00 0.50 PROD1, DRILL RURD T RD Cement line and LD swivel. Establish static los rates. 58 BPH. 13,000.0 13,000.0 11/30/2023 18:00 11/30/2023 20:30 2.50 PROD1, DRILL SMPD T SOOH f/ 13000' to 11586'. Holding 8.8ppg EMW w/ MPD 13,000.0 11,568.0 11/30/2023 20:30 11/30/2023 21:00 0.50 PROD1, DRILL OWFF T Establish Static loss rate. 48 BPH. 11,568.0 11,568.0 11/30/2023 21:00 11/30/2023 23:00 2.00 PROD1, DRILL CIRC T Circulate down drillstring at 120 GPM (below tool rate) for 10 minutes. Pump 50 BBLs sugar water and stage rates up to 200 GPM. Confirm tools working. Pump sugar surface to surface to scour drillstring and clean tools. Dynamic loss rate 65 BPH. 200 GPM 1100 PSI 9.4ppg ECD 10 RPM 4k TQ 11,568.0 11,568.0 11/30/2023 23:00 12/1/2023 00:00 1.00 PROD1, DRILL OWFF T Circulate across top of hole. WOC and monitor loss rate. Static loss rate 48 BPH. 11,568.0 11,568.0 12/1/2023 00:00 12/1/2023 08:30 8.50 PROD1, DRILL OWFF T Circulate across top of hole. WOC and monitor loss rate. Static loss rate 48 BPH. 11,568.0 11,568.0 12/1/2023 08:30 12/1/2023 10:00 1.50 PROD1, DRILL SMPD T Install RCD bearing and SIH to 13000' while WOC. 11,568.0 13,000.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 15/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/1/2023 10:00 12/1/2023 16:30 6.50 PROD1, DRILL REAM T Wash/Ream f/ 13000' to 15183'. 150-180 GPM 500-1100 PSI 40-70 RPM 6-14k TQ Loss rate- 20-30 BPH 13,000.0 15,183.0 12/1/2023 16:30 12/1/2023 18:45 2.25 PROD1, DRILL CIRC T Tools stopped pulsing. Recycle pumps. Troubleshoot. Pumped 30 BBL FW pill. Tools came back on. 15,183.0 15,183.0 12/1/2023 18:45 12/2/2023 00:00 5.25 PROD1, DRILL DDRL P Drill 15182' to 15714' MD'/ 8351' TVD. Closing choke on connections. 0 PSI build. 18k WOB 230 GPM 1600 PSI 130 RPM 16k TQ 9.7ppg ECD 258k PU 128k SO 182k ROT Losses: 60 BPH 15,183.0 15,714.0 12/2/2023 00:00 12/2/2023 06:00 6.00 PROD1, DRILL DDRL P Drill 15714' to 16316' MD'/ 8341' TVD. Closing choke on connections. 0 PSI build. 9k WOB 230 GPM 1514 PSI 130 RPM 19k TQ 9.7ppg ECD 259k PU 118k SO 187k ROT 340 units Max gas 50.7 TTL bit hrs Losses: 50 BPH 15,714.0 16,316.0 12/2/2023 06:00 12/2/2023 12:00 6.00 PROD1, DRILL DDRL P Drill 16316' to 16953' MD'/ 8330' TVD. Closing choke on connections. 0 PSI build. 9k WOB 230 GPM 1480 PSI 130 RPM 18k TQ 9.6ppg ECD 258k PU 118k SO 189k ROT 240 units Max gas 55.1 TTL bit hrs Losses: 50 BPH 16,316.0 16,953.0 12/2/2023 12:00 12/2/2023 13:00 1.00 PROD1, DRILL CIRC T Circulate and condition mud while cleaning up flow line and shakers due to cement contamination. Blinding shaker screens. Install various sizes to mitigate shakers blinding. 16,953.0 16,953.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 16/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/2/2023 13:00 12/2/2023 18:00 5.00 PROD1, DRILL DDRL P Drill 16953' to 17435' MD'/ 8322' TVD. Closing choke on connections. 0 PSI build. 13k WOB 230 GPM 1400 PSI 130 RPM 15k TQ 9.6ppg ECD 251k PU 122k SO 190k ROT 500 units Max gax 55.1 TTL bit hrs Losses: 60 BPH 16,953.0 17,435.0 12/2/2023 18:00 12/3/2023 00:00 6.00 PROD1, DRILL DDRL P Drill 17435' to 18050' MD'/ 8312' TVD. Closing choke on connections. 0 PSI build. 10k WOB 200 GPM 1250 PSI 130 RPM 14k TQ 9.6ppg ECD 229k PU 140k SO 181k ROT 731 units Max gax 62.8 TTL bit hrs Losses: 65-70 BPH. Started adding background LCM at 17650'. 17,435.0 18,050.0 12/3/2023 00:00 12/3/2023 06:00 6.00 PROD1, DRILL DDRL P Drill 18050' to 18715' MD/ 8312' TVD. Closing choke on connections. 0 PSI build. 6k WOB 200 GPM 1230 PSI 130 RPM 7k TQ 9.4ppg ECD 227k PU 142k SO 184k ROT 2010 units Max gax 67.4 TTL bit hrs Losses: 65-70 BPH. Started adding background LCM at 17650'. 18,050.0 18,715.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 17/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/3/2023 06:00 12/3/2023 10:00 4.00 PROD1, DRILL DDRL P Drill 18715' to 19100' MD/ 8300' TVD. TD section. Closing choke on connections. 0 PSI build. 2k WOB 200 GPM 1300 PSI 120 RPM 5k TQ 9.6ppg ECD 232k PU 133k SO 184k ROT 550 units Max gax 70.1 TTL bit hrs Losses: 65-70 BPH. Started adding background LCM at 17650'. 18,715.0 19,100.0 12/3/2023 10:00 12/3/2023 12:00 2.00 PROD1, TRIPCAS CIRC P Take final survey. Downlink and turn tools off. Circulate BU. 230 GPM 1500 PSi 80 RPM 6k TQ 9.6ppg ECD 19,100.0 19,100.0 12/3/2023 12:00 12/3/2023 12:30 0.50 PROD1, TRIPCAS OWFF P Attempt to fingerprint well - on static losses. Flow check. Static losses = 48 BPH. 19,100.0 19,100.0 12/3/2023 12:30 12/4/2023 00:00 11.50 PROD1, TRIPCAS CIRC P Circulate Hole clean. Rotate and reciprocate drillstring from 19100' to 19020'. 200 GPM 1280 PSI 80 RPM 7k TQ. Static losses- 50 BPH Dynamic losses 75 BPH Note: Extended circulating due to waiting on Brine from mud plant. 19,100.0 19,100.0 12/4/2023 00:00 12/4/2023 01:00 1.00 PROD1, TRIPCAS CIRC P Circulate and prep to displace well. Rotate and reciprocate drillstring 19100' to 19020'. 200 GPM 1280 PSI 80 RPM 7k TQ. Static losses- 50 BPH Dynamic losses 75 BPH Note: Extended circulating due to waiting on Brine from mud plant. 19,100.0 19,100.0 12/4/2023 01:00 12/4/2023 05:00 4.00 PROD1, TRIPCAS CIRC P Displace hole to 8.8ppg Vis Brine. 200 GPM 1120 PSI 120 RPM 7k TQ 19,100.0 19,100.0 12/4/2023 05:00 12/4/2023 05:30 0.50 PROD1, TRIPCAS OWFF P Flow check. Static losses = 27 BPH 19,100.0 19,100.0 12/4/2023 05:30 12/4/2023 14:00 8.50 PROD1, TRIPCAS SMPD P SOOH f/ 19100' to 11856'. 0 PSI in slips/30 PSI out with MPD. 19,100.0 11,586.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 18/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/4/2023 14:00 12/4/2023 17:00 3.00 PROD1, TRIPCAS CIRC P Circulate casing clean. 230 GPM 1000 PSI 30 RPM 4k TQ 200k PU 173k SO 182k ROT 11,586.0 11,586.0 12/4/2023 17:00 12/4/2023 18:00 1.00 PROD1, TRIPCAS MPDA P Retrieve RCD bearing assembly and install trip nipple. Static loss rate 48 BPH. Drop 2.15" hollow drift w/ tail 11,586.0 11,586.0 12/4/2023 18:00 12/5/2023 00:00 6.00 PROD1, TRIPCAS TRIP P POOH f/ 11586' to 412'. Several overtorqued connections. 11,586.0 412.0 12/5/2023 00:00 12/5/2023 00:30 0.50 PROD1, TRIPCAS OWFF P Rack back last std of 4" DP. Flow check. Static loss rate 55 BPH. 412.0 315.0 12/5/2023 00:30 12/5/2023 02:30 2.00 PROD1, TRIPCAS BHAH P LD HWDP and BHA. 315.0 0.0 12/5/2023 02:30 12/5/2023 03:00 0.50 PROD1, TRIPCAS CLEN P Clean and clear rig floor. 0.0 0.0 12/5/2023 03:00 12/5/2023 04:00 1.00 COMPZN, CASING RURD P RU tbg handling equipment. 0.0 0.0 12/5/2023 04:00 12/5/2023 12:30 8.50 COMPZN, CASING PUTB P MU float shoe and visually check float. RIH w/ 4 1/2" 12.6# H563 tbg as per tally to 7618'. 0.0 7,618.0 12/5/2023 12:30 12/5/2023 13:30 1.00 COMPZN, CASING PUTB P MU liner hanger/packer. RIH. 7,618.0 7,664.0 12/5/2023 13:30 12/5/2023 23:00 9.50 COMPZN, CASING RUNL P RIH w/ liner on 4" DP f/ 7664' to 19100'. Filling pipe w/ fillup hose. Did not fill on last 10 stds. Set down 5k @ 19100'. At shoe - 140k PU 132k SO 15k ROT 20 RPM 3k TQ 7,664.0 19,100.0 12/5/2023 23:00 12/5/2023 23:30 0.50 COMPZN, CASING RURD P MU cement swivel and set liner on depth. 19,100.0 19,100.0 12/5/2023 23:30 12/6/2023 00:00 0.50 COMPZN, CEMENT CIRC P Attempt to shear flotation sub. 1/2 BPM 1st - 1200 PSI. Bleed off. 2nd - 1200 PSI. Bleed off. 19,100.0 19,100.0 12/6/2023 00:00 12/6/2023 00:30 0.50 COMPZN, CEMENT CIRC P Attempt to shear flotation sub. 1/2 BPM 3rd - 1300 PSI. Bleed off 4th - 1400 PSi. Hold and sheared at 1400psi. Stage rate up to 5 BPM. Fill liner. Decrease rate when catching pressure to 3 BPM. 450psi, pumped 135bbls to catch pressure. 19,095.0 19,095.0 12/6/2023 00:30 12/6/2023 03:30 3.00 COMPZN, CEMENT CIRC P Circulate surface to surface volume. 5 BPM/ 860 PSI. 85-90 BPH loss rate. PJSM. Pumped 8950stks (757bbls) 19,095.0 19,095.0 12/6/2023 03:30 12/6/2023 04:00 0.50 COMPZN, CEMENT RURD P SD. Swap over to cementers. RU bleeder liner to wash up cementers. Pump 10bbls water, Test lines to 4600psi. 19,095.0 19,095.0 12/6/2023 04:00 12/6/2023 06:00 2.00 COMPZN, CEMENT CMNT P Pump 37bbls 13.0ppg mud push, mix and pump 308bbls 15.3ppg CTD slim hole slurry. Cement wet at 04:24hrs. 19,095.0 19,095.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 19/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/6/2023 06:00 12/6/2023 07:00 1.00 COMPZN, CEMENT CMNT P Open bleeder. SLB pump 10bbls water, Line up to displace , Drop dart, Pump at 250gpm (caught pressre @ 510stks) reduce rate to 130gpm 600psi top dart land at 1320stks and sheared at 1132psi, @ 2350stks lower rate and bump at 2683stks 1,280psi, pressure up to 1,780psi, Hole 5min (All good) 19,095.0 19,095.0 12/6/2023 07:00 12/6/2023 07:45 0.75 COMPZN, CEMENT PRTS P Set hanger, Pressure up to 2500psi and hold 2 min, Slack off to 43k, Pressure up to 3,970psi to release hanger, Bled off to 0psi, P/U to 210k, P/U 6' and expose dog sub, S/O 50k, P/U, rotate 20rpm set down to130k confirm packer set. TOL at 11,446' MD Shoe at 19,095' MD 19,095.0 19,095.0 12/6/2023 07:45 12/6/2023 08:15 0.50 COMPZN, CEMENT RURD P R/D Cement swivel and lines. 19,095.0 19,095.0 12/6/2023 08:15 12/6/2023 09:00 0.75 COMPZN, WELLPR CIRC P Pressure up to 500psi, Pull out liner top without pressure drop, P/U and observed returns, Circulate BU at 10bpm 427gpm 1060 - 1550psi. Mud push at surface at 4640stks at 3200stks dump cement (37bbls cement return) 11,446.0 11,426.0 12/6/2023 09:00 12/6/2023 10:30 1.50 COMPZN, WELLPR CIRC P Install and pump wipper ball at 430gpm 920-1050psi 11,426.0 11,404.0 12/6/2023 10:30 12/6/2023 12:00 1.50 COMPZN, WELLPR SLPC P Slip and cut 126' drill line, Set block hight and COM 11,404.0 11,404.0 12/6/2023 12:00 12/6/2023 15:00 3.00 COMPZN, WELLPR TRIP P POOH from 11,404' MD racking back 4" drill pipe. 11,404.0 7,328.0 12/6/2023 15:00 12/6/2023 20:30 5.50 COMPZN, WELLPR PULD P POOH L/D 4" drill pipe singles from 7,328' MD to 3,927' MD. 7,328.0 3,927.0 12/6/2023 20:30 12/6/2023 21:00 0.50 COMPZN, WELLPR SVRG P Service rig and pipe skate 3,927.0 3,927.0 12/6/2023 21:00 12/7/2023 00:00 3.00 COMPZN, WELLPR PULD P POOH L/D 4" drill pipe singles from 3,927' MD to 2,176' MD. (high torque connections) 3,927.0 2,176.0 12/7/2023 00:00 12/7/2023 03:30 3.50 COMPZN, WELLPR PULD P Continue L/D 4" drill pipe from 2,176' MD to Surface, (high torque connections) L/D running tools (good shear on dog sub). 2,176.0 0.0 12/7/2023 03:30 12/7/2023 04:30 1.00 COMPZN, WELLPR BHAH P M/U Baker 7-5/8" scrapper assy 60.80'. 0.0 60.0 12/7/2023 04:30 12/7/2023 10:45 6.25 COMPZN, WELLPR TRIP P Continue TIH from 60' MD to 11,038' MD. 60.0 11,038.0 12/7/2023 10:45 12/7/2023 13:00 2.25 COMPZN, WELLPR WASH P Wash in hole from 11,038' MD to 11,442' MD. Tagged 3X with 5k at 11,442' MD. GPM: 420 PSI: 1230 PU: 185k SO: 160 ROT: 176k TRQ: 3k 11,038.0 11,442.0 12/7/2023 13:00 12/7/2023 14:00 1.00 COMPZN, WELLPR CIRC P Circulate BTM's up at 11,442' MD, Pump 50bbls spacer and displace well to 8.8ppg corrosion inhibited brine. GPM: 420 PSI: 1620 PU: 195k SO: 155 11,442.0 11,442.0 12/7/2023 14:00 12/7/2023 15:00 1.00 COMPZN, WELLPR OWFF P OWFF 30min (static). Prep to L/D doubles. CO PSI reg on Shot Pin Assy. 11,442.0 11,442.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 20/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/7/2023 15:00 12/8/2023 00:00 9.00 COMPZN, WELLPR PULD P POOH from 11,442' MD to 2,901' MD, L/D 102 / 4" drill pipe in doubles. Continue L/D singles. 11,442.0 2,901.0 12/8/2023 00:00 12/8/2023 03:45 3.75 COMPZN, WELLPR PULD P Continue POOH and L/D 4" DP singles from 2,901' MD to surface. 2,901.0 0.0 12/8/2023 03:45 12/8/2023 04:30 0.75 COMPZN, WELLPR OWFF P OWFF (Static). L/D Scrapper assy. (Very little material on magnets and nothing in bootbaskets). No cement observed on tools. 0.0 0.0 12/8/2023 04:30 12/8/2023 05:45 1.25 COMPZN, WELLPR WWWH P Blow down top drive and equipment. Pull wear ring and jet stack. 0.0 0.0 12/8/2023 05:45 12/8/2023 07:00 1.25 COMPZN, WELLPR PRTS P Test liner top to 3,500psi for 30min (good test). 0.0 0.0 12/8/2023 07:00 12/8/2023 07:30 0.50 COMPZN, RPCOMP RURD P R/U to run 4.5" 12.6ppf, L80, H563 upper completion. 0.0 0.0 12/8/2023 07:30 12/8/2023 09:00 1.50 COMPZN, RPCOMP PUTB P PJSM. RIH w/ upper completion. P/U HES downhole gauge assembly & test to 9,500psi for 5min - Good test. CPAI witness. 0.0 120.0 12/8/2023 09:00 12/8/2023 12:00 3.00 COMPZN, RPCOMP PUTB P RIH w/4.5" 12.6ppf, L80, H563 upper completion to 2,417' MD. Running TEC line and installing Cannon clamps every joint. Checking control line every 1000' MD. 120.0 2,417.0 12/8/2023 12:00 12/8/2023 18:00 6.00 COMPZN, RPCOMP PUTB P Continue RIH w/4.5" 12.6ppf, L80, H563 upper completion to 7,900' MD. Running TEC line and installing Cannon clamps every joint. Checking control line every 1000' MD. 2,417.0 7,900.0 12/8/2023 18:00 12/8/2023 22:00 4.00 COMPZN, RPCOMP PUTB P Continue RIH w/4.5" 12.6ppf, L80, H563 upper completion to 11,451' MD. Running TEC line and installing Cannon clamps every joint. Checking control line every 1000' MD. Land tubing at 11,451' MD, Witness locater sheared with 12k. PU: 175k SO: 138k Down hole pressure: 3764psi Down hole temp: 157° 7,900.0 11,451.0 12/8/2023 22:00 12/9/2023 00:00 2.00 COMPZN, RPCOMP OTHR P MU pup joints - 9.9', 9.8', 8.08', 5.78' and rerun joint #272. MU hanger and landing joint. Terminate line through hanger and test to 5,000psi - Good test. Land hanger with 138k. RILD. (3.36' above full located). Fill stack and flood lines. 11,411.0 11,451.0 12/9/2023 00:00 12/9/2023 00:30 0.50 COMPZN, RPCOMP PRTS P RU test equipment. Test hanger seals to 3000 psi for 5 min - Good test. 0.0 0.0 12/9/2023 00:30 12/9/2023 01:00 0.50 COMPZN, RPCOMP OTHR P Drop 1-5/16" ball and rod. 0.0 0.0 12/9/2023 01:00 12/9/2023 03:30 2.50 COMPZN, RPCOMP PRTS P RU test lines. Pressure up tubing, set packer and test tubing to 4,200 psi for 30 min. Bleed tubing down to 3,000 psi, bring pressure on IA to 4,200 psi and hold pressure for 30 min. Bleed tubing to 0 psi, shear SOV. Tubing and IA equalized and bled to 0 psi. Observed IA for flow for 30 min - No flow. 0.0 0.0 12/9/2023 03:30 12/9/2023 06:00 2.50 COMPZN, RPCOMP OTHR P Vac out BOP stack. Pull landing joint and install BPV. Pump down IA. Test BPV in direction of flow to 3,000 psi for 10 min 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 21/21 MT7-03 Report Printed: 12/11/2023 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/9/2023 06:00 12/9/2023 06:30 0.50 COMPZN, RPCOMP OTHR P Blow down all surface equipment. 0.0 0.0 12/9/2023 06:30 12/9/2023 07:30 1.00 COMPZN, RPCOMP RURD P De-Energize KOOMEY, Clean flow box and L/D mouse hole. 0.0 0.0 12/9/2023 07:30 12/9/2023 09:30 2.00 COMPZN, WHDBOP NUND P Remove trip nipple, break bolts on stack and remove choke and kill lines. Skid BOP's into STOW position. Remove risers. 0.0 0.0 12/9/2023 09:30 12/9/2023 12:00 2.50 COMPZN, WHDBOP NUND P HES terminate TEC line and install 10k adaptor flange. Torque adaptor, (test to 5k 10 min). Stage 10k tree in cellar. 0.0 0.0 12/9/2023 12:00 12/9/2023 14:00 2.00 COMPZN, WHDBOP NUND P N/U 10k frac tree and test to 9,600psi (good test). 0.0 0.0 12/9/2023 14:00 12/9/2023 18:00 4.00 COMPZN, WHDBOP FRZP P Pull BPV, R/U LRS, test lines to 3500 psi, Pump 50 bbls diesel down IA taking returns up tubing. Shut down and let U- Tube for one hour. IA: 0psi OA: 0psi TBG: 0psi 0.0 0.0 12/9/2023 18:00 12/9/2023 21:00 3.00 COMPZN, WHDBOP RURD P R/D all service lines and equipment. Secure well for MOB. 0.0 0.0 12/9/2023 21:00 12/10/2023 00:00 3.00 COMPZN, WHDBOP RURD P Clean pits and cellar area and tree, Install companion flanges and gauges. Clear 5k tree from rig floor. SIMOPS: Scope down derrick, Secure top drive, Unspool drill line, Blow down steam system and lower cattle chute. Rig release from MT7-03 RWO at 00:00 hrs 12-10-23. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 12/10/2023 Page 1 Laboratory Cement Test Report CPAI - MT7-03 - Kick Off Plug - Liquid Adds - Field Blend LAR Name : AKA 2023-114 Client : CPAI Location : Prudhoe Bay Date : Nov-19-2023 Well Name : MT7-03 Rig : Doyon 25 String : KickOffPlug Signatures Report created by: Roarke Burnett Design input by: Stephen Lauper Job Type : Remedial MD : 11,824.00 ft TVD : 8,351.76 ft BHST : 195 °F BHCT : 161 °F BHP : 3,941 psi Starting Temp : 75 °F Time To Temp : 00:37 hr:mn Heating Rate : 0.00 °F/min Starting Pressure : 0 psi Time To Pressure : 00:37 hr:mn Composition Slurry Density : 16.50 lb/gal Yield : 1.067 ft³/sk of blend Mix Fluid : 4.462 gal/sk of blend Solid Vol. Fraction : 44.099 % Slurry Type : Mix Water : 3.982 gal/sk of blend Code Concentration Sack Reference Component Blend Density Lot Number D907 100.000 % BWOB Blend sack: 94.00 lb Cement 3.2000 kg/L Silo 29 D047 0.050 gal/sk VBWOB Anti Foam D009L95L04 D080 0.200 gal/sk VBWOB Dispersant 8R3H0003A0 D168 0.200 gal/sk VBWOB Fluid loss USBR028268 D110 0.030 gal/sk VBWOB Retarder DLM-25293 Fresh Water 3.982 gal/sk of blend Base Fluid Alpine K-Pad Rheology S/N: 1019 Surface (Configuration: R1B1 F1.0) Temperature 80 °F (rpm)Up (deg) Down (deg) Average (deg) 300 73 73 73 200 50 50 50 100 27 27 27 60 17 17 17 30 10 10 10 6 4 4 4 3 3 3 3 10 sec Gel 4 deg - 4 lbf/100ft² 10 min Gel Max >300 deg - 319 lbf/100ft² 10 min Gel Stable 23 deg - 23 lbf/100ft 2 Rheo. computed PV: 70 cP, Ty: 3 lbf/100ft² S/N: 1019 Downhole (Configuration: R1B1 F1.0) Temperature 161 °F (rpm)Up (deg) Down (deg) Average (deg) 300 198 198 198 200 142 143 143 100 79 79 79 60 50 50 50 30 27 28 28 6 7 7 7 3 4 4 4 10 sec Gel 5 deg - 5 lbf/100ft² 10 min Gel 36 deg - 38 lbf/100ft² Rheo. computed PV: 196 cP, Ty: 7 lbf/100ft² Thickening Time S/N: 460 Consistency Time Temp Go/No-Go: On: 00:50 hr:mn Off: 00:45 hr:mn 30 Bc 01:47 hr:mn 161 °F 50 Bc 05:44 hr:mn 161 °F 70 Bc 05:59 hr:mn 161 °F 100 Bc 06:08 hr:mn 161 °F Free Fluid Trace / 250 mL in 2 hrs At 80 °F and 45 deg inclination Sedimentation: None Fluid Loss S/N: 14-08 #1 API/Calculated Fluid Loss 100.43 mL 41.00 mL in 20 mins at 161 °F Non Stirred Fluid Loss apparatus was utilized UCA S/N: 946R Conditioned at 161 °F and atm psi for 30 mins after reaching temperature Time CS Acoustic Impedance Temp 16:36 hr:mn 50 psi 3.000 Mrayl 189 °F 17:42 hr:mn 500 psi 4.000 Mrayl 189 °F Comments All slurries prepared and tested in accordance with API RP 10B-2 unless otherwise noted Time to Add Solids : 00:09 mn:sc Vortex Quality: good/visible Thickening Time: Thickening Time 1: Spike: 28 Bc 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ___________________ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number): 10. Field: Greater Mooses Tooth \ Rendezvous 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 21050 2918 N/A Casing Collapse Structural Conductor Surface 2260 Intermediate 1 4790 Intermediate 2 Liner Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Joseph Longo Contact Email:joseph.j.longo@concophillips.com Contact Phone: 907-947-4323 Authorized Title: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng AOGCC USE ONLY Suspension Expiration Date: Subsequent Form Required: 11/20/2023 11/20/2023 Victoria Loepp 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Staff Drilling Engineer N/A N/A N/A N/A N/A N/A N/A Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 11624 7-5/8" 11624 8304 6890 120 20" 120 120 3553 13-3/8" 3553 3076 5020 Length Size MD TVD Burst AA081800, AA081803, AA081781 PRESENT WELL CONDITION SUMMARY MPSP (psi): Plugs (MD): 8176 21050 8176 N/A P.O. Box 100360 Anchorage, Alaska, 99510-0360 50-103-20830-00-00 CO 793 MT7-03Will perfs require a spacing exception due to property boundaries? Current Pools: Proposed Pools: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ConocoPhillips 221-024 Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov   By Grace Christianson at 2:09 pm, Nov 20, 2023 A.Dewhurst 22NOV23 DSR-11/20/23 3523 10-407 BOP test to 5000 psig Annular preventer test to 2500 psig VTL 11/22/2023 X X X JLC 11/22/2023 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.11.22 11:38:46 -09'00'11/22/23 RBDMS JSB 112823 ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, AK 99510-0360 Telephone 907-276-1215 November 20, 2023 Alaska Oil and Gas ConservaƟon Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Re: ApplicaƟon for Sundry Approval MT7-03 – Plug for Redrill Dear Sir or Madam, ConocoPhillips Alaska, Inc. hereby applies for sundry approval for the MT7-03 well on the MT7 drilling pad. The intended start of operaƟons for this sundry is November 11, 2023. The MT7-03 single lateral northern injector was installed with an upper compleƟon consisƟng of a tubing tail and producƟon packer. The lateral was leŌ barefoot. An unsuccessful aƩempt was made to reach our minium recompleƟon depth. This sundry requests approval to place a cement kick oī plug in the open hole, ~500’ below the exisƟng 7-5/8” intermediate casing shoe to ~300’ into the casing shoe. The well will then be sidetracked below the intermediate casing shoe, as outlined the the MT7-03A APD. If you have any quesƟons or require further informaƟon, please contact Joseph Longo at (907) 947-4323 (joseph.j.longo@conocophillips.com) or Greg Hobbs at 907-263-4749 (greg.s.hobbs@conocophillips.com). Regards, Joseph Longo Staff Drilling Engineer cc: MT7-03 Well File / Jenna Taylor ATO 1732 David Lee ATO 1552 Chris Brillon ATO 1548 Andy Mack Kuukpik Corp ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, AK 99510-0360 Telephone 907-276-1215 Review: The MT7-03 clean-out run reached a maximum depth of 13,351’ MD. Due to diĸculty making progress cleaning out the decision was made to pump thixotropic cement to address lost circulaƟon in place of running and cemenƟng a sacriĮcial liner. Thixotropic Cement: 170 bbls of Thixotropic cement was pumped and bullheaded into the conformance zone. IniƟal placement leŌ 50 bbls in the lateral. 3 @ 10 bbl squeezes were then performed, placing TOC at 13,329’ MD. Two diīerent blends of thixotropic cement were pumped, one being 14.0 ppg and the other 14.5 ppg. Since the conformance zone was not reached during our cleanout run, we will conƟnue to work as outlined in “Planned OperaƟon 12A” on page 3 of the Sundry request. OperaƟons Overview: 1. A 3-1/2” cement sƟnger and a bridge plug will be picked up and run in hole on 4” DP. 2. The bridge plug will be set ~500’ MD below the 7-5/8” shoe at 12,145’ MD. 3. A 16.5 ppg cement kick oī plug will be placed on top of the bridge plug from 11,324’ MD to 12,124’ MD. a. This will be spoƩed as a balanced plug. b. Planned ~43 bbls 16.5 ppg G-Blend 4. The sƟnger will be pulled out of the plug and the cased hole above the plug will be circulated clean. 5. The sidetrack will kick oī the 500’ porƟon of the 16.5 ppg cement kick-oī plug that is below the exisƟng 7-5/8” intermediate casing shoe. ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, AK 99510-0360 Telephone 907-276-1215 Drill Pipe 4" XT39 14 ppf S135 CMT Stinger 3-1/2" 8RD EUE 9.3 ppf L80 16.5 ppg Class G KICK OFF PLUG Intermediate I Casing 7-5/8" 29.7# L80 H563 x 7-5/8" 33.7# L80 TXPM 11624' MD/ 8304' TVD Surface Casing 13-3/8" 68# L80 H563 3553' MD/ 3076' TVD Cemented to Surface Lead: 11.0 ppg DeepCRETE | Tail: 15.8 ppg Class G 1200' 300' 500' TD 6-½” Production Section 21050' MD/ 8176' TVD MT-03 Single Lateral Injector DRAFT –KICK OFF PLUG PLAN RKB = 140.7’ AMSL JJLONGO -11/20/2023 Conformance Zone - 13830' MD Max Clean Out Depth 13351' MD Est. TOC 13329' MD OH Bridge Plug 12124' MD 170 bbls 14.5 ppg Thixo Slurry ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, AK 99510-0360 Telephone 907-276-1215 MT7-03A Single Lateral Injector UPPER COMPLETION: 1. 4-½” X Landing Nipple (3.813" ID) 2. 4-½” x 1" KBG 4-5 (3x – 1 SOV, 2 DV) 3. 4-½” X Landing Nipple (3.813" ID) 4. HES Opsis Downhole Gauge 5. HES TNT Packer 6. 4-½” DB Landing Nipple (3.75" ID) DRAFT -WP02 RKB = 140.7’ AMSL JJLONGO - 7/11/2023 Surface Casing 13-3/8" 68# L80 H563 3553' MD/ 3076' TVD Cemented to Surface Lead: 11.0 ppg DeepCRETE | Tail: 15.8 ppg Class G 4-1/2" 12.6# L80 H563 Production Tubing Intermediate I Casing 7-5/8" 29.7# L80 H563 x 7-5/8" 33.7# L80 TXPM 11624' MD/ 8304' TVD 4-1/2" 12.6# L80 H563 21035' MD / 8280' TVD 6-1/2" Production Hole 21040' MD/ 8280' TVD 4-1/2" 12.6# L80 H563 Swell Packer and sleeve positioning will be optimized based on as-drilled data MT7-03 Abandoned Lateral 7-5/8" x 4-1/2" Production Packer 11329' MD / 8216' TVD HRDE ZXHD Liner Top PKR 11449' MD / 8256' TVD Page 1 Laboratory Cement Test Report CPAI - MT7-03 - Kick Off Plug - Liquid Adds - Field Blend LAR Name : AKA 2023-114 Client : CPAI Location : Prudhoe Bay Date : Nov-19-2023 Well Name : MT7-03 Rig : Doyon 25 String : KickOffPlug Signatures Report created by: Roarke Burnett Design input by: Stephen Lauper Job Type : Remedial MD : 11,824.00 ft TVD : 8,351.76 ft BHST : 195 °F BHCT : 161 °F BHP : 3,941 psi Starting Temp : 75 °F Time To Temp : 00:37 hr:mn Heating Rate : 0.00 °F/min Starting Pressure : 0 psi Time To Pressure : 00:37 hr:mn Composition Slurry Density : 16.50 lb/gal Yield : 1.067 ft³/sk of blend Mix Fluid : 4.462 gal/sk of blend Solid Vol. Fraction : 44.099 %Slurry Type : Mix Water : 3.982 gal/sk of blend Code Concentration Sack Reference Component Blend Density Lot Number D907 100.000 % BWOB Blend sack: 94.00 lb Cement 3.2000 kg/L Silo 29 D047 0.050 gal/sk VBWOB Anti Foam D009L95L04 D080 0.200 gal/sk VBWOB Dispersant 8R3H0003A0 D168 0.200 gal/sk VBWOB Fluid loss USBR028268 D110 0.030 gal/sk VBWOB Retarder DLM-25293 Fresh Water 3.982 gal/sk of blend Base Fluid Alpine K-Pad Rheology S/N: 1019 Surface (Configuration: R1B1 F1.0) Temperature 80 °F (rpm)Up (deg) Down (deg) Average (deg) 300 73 73 73 200 50 50 50 100 27 27 27 60 17 17 17 30 10 10 10 6 4 4 4 3 3 3 3 10 sec Gel 4 deg - 4 lbf/100ft² 10 min Gel Max >300 deg - 319 lbf/100ft² 10 min Gel Stable 23 deg - 23 lbf/100ft 2 Rheo. computed PV: 70 cP, Ty: 3 lbf/100ft² S/N: 1019 Downhole (Configuration: R1B1 F1.0) Temperature 161 °F (rpm)Up (deg) Down (deg) Average (deg) 300 198 198 198 200 142 143 143 100 79 79 79 60 50 50 50 30 27 28 28 6 7 7 7 3 4 4 4 10 sec Gel 5 deg - 5 lbf/100ft² 10 min Gel 36 deg - 38 lbf/100ft² Rheo. computed PV: 196 cP, Ty: 7 lbf/100ft² Thickening Time S/N: 460 Consistency Time Temp Go/No-Go: On: 00:50 hr:mn Off: 00:45 hr:mn 30 Bc 01:47 hr:mn 161 °F 50 Bc 05:44 hr:mn 161 °F 70 Bc 05:59 hr:mn 161 °F 100 Bc 06:08 hr:mn 161 °F Free Fluid Trace / 250 mL in 2 hrs At 80 °F and 45 deg inclination Sedimentation: None Fluid Loss S/N: 14-08 #1 API/Calculated Fluid Loss 100.43 mL 41.00 mL in 20 mins at 161 °F Non Stirred Fluid Loss apparatus was utilized UCA S/N: 946R Conditioned at 161 °F and atm psi for 30 mins after reaching temperature Time CS Acoustic Impedance Temp 16:36 hr:mn 50 psi 3.000 Mrayl 189 °F 17:42 hr:mn 500 psi 4.000 Mrayl 189 °F Comments All slurries prepared and tested in accordance with API RP 10B-2 unless otherwise noted Time to Add Solids : 00:09 mn:sc Vortex Quality: good/visible Thickening Time: Thickening Time 1: Spike: 28 Bc                                                                             ! " # $ ! #  $ $ %          ! " # $ ! !                    & '      (    )    *      +       , "   -  . " #                     ! " " #  $      % &   ' %  (           )         '    *   ! $"   $  - . % %    (   + ,  ! # "      ,  # "    -  ,  # "     - ,   # "      "   $ - , -    .      %   /   /         0  &1      " "   $ ,    .   " "  %   /   /     -      &1 .   0 ! 2 #       *  '  ! /      + 0  %            '   % 0   ! !    /   /                                                                                           !" #!                                                                         !     "                                        #  $ %         !   &  '       $                    $   # (         )   ' *    + ,        - )  .  /   ) / / " !       - )  .  /     ) & !      0 , . /    )   "    1    2 3 2   ) )     !          3  ! 4 5 6 6     &  7    2    " # 8  2 9             2  /    ) .            :        * &   !  3       )    )   . ,          ) ) * ) *      0 :     $ )  9 /  '  *          ,           ) ) * )  *   )     0 $     ; - 9 /    :  . - 9     :  - 9     : )   - 9    : ) ) #<  , )  )    " )             ) ) * )  *    / 2 0 #<  , )  /    "        .    = ' , $   3  ! 4 5 6 6     " #    )   1    :  $    /                                                ! "#                         $  %  &'  Sundry Application Well Name______________________________ (PTD _________; Sundry _________) Plug for Re-drill Well Workflow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of "Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and initial it on the Form 10-403. Geologist 2 If the “Abandon” box is checked in Box 15 (Well Status after proposed work) the initial reviewer will cross out that checkbox and instead, check the "Suspended" box and initial those changes. Geologist The drilling engineer will serve as quality control for steps 1 and 2. Petroleum Engineer (QC) 3 When the RA2 receives a Form 10-403 with a check in the "Plug for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." Research Analyst 2 4 When the RA2 receives Form 10-407, they will check the History tab in RBDMS for the IPBRD code. If IPBRD is present and there is no evidence that a subsequent re-drill has been completed, the RA2 will assign a status of SUSPENDED to the well bore in RBDMS. The RA2 will update the status on the 10-407 form to SUSPENDED, and date and initial this change. If the RA2 does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. Research Analyst 2 5 When the Form 10-407 for the redrill is received, the RA2 will change the original well's status from SUSPENDED to ABANDONED. Research Analyst 2 6 The first week of every January and July, the RA2 and a Geologist or Reservoir Engineer will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all Plug for Redrill sundried wells have been updated to reflect current status. At this same time, they will also review the list of suspended wells for accuracy and assign expiration dates as needed. Research Analyst 2 Geologist or Reservoir Engineer GMTU MT7-03 221-024 A.Dewhurst 22NOV23 323-628 From:Loepp, Victoria T (OGC) To:Longo, Joseph J Subject:GMT MT7-03 (PTD 221-024, Sundry 323-628) Plug for Redrill Verbal Approval Date:Monday, November 20, 2023 8:37:00 PM Joe, Verbal approval is granted to proceed with the scope of this submitted sundry. Victoria Loepp Victoria Loepp Senior Petroleum Engineer Alaska Oil & Gas Conservation Commission Work: (907)793-1247 CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Longo, Joseph J To:Loepp, Victoria T (OGC) Subject:MT7-03 Plug for Redrill Plan of operations update Date:Tuesday, November 21, 2023 11:43:40 AM Attachments:image003.png Victoria, How are you doing today? Yesterday I submitted a MT7-03 10-403 plug for redrill. The plan was to set a bridge plug in open hole, use it as a base, and place an ~800’ balanced plug on top of that. Due to equipment concerns we are pivoting slightly in our current plan forward and will not be running the bridge plug. Last night we bull headed a gel pill which reduced our static loss rate to ~10 BPH. Currently we are POOH with our clean out assembly. The plan forward will be to pick up ~1200’ of 3-1/2” stinger, TIH, bullhead a 100 bbl/ 100 ppb LCM pill followed by another gel pill. We will then plan to place 2 800’ - 16.5 ppg Class G balanced plugs. After placing the first and cleaning up we will assess the loss rate and determine if it makes most sense to immediately start placing the second plug or determine if we would benefit from waiting to cement to cure potentially reducing the loss rate. We will plan to bring the second plug ~300 into the existing 7-5/8” casing. The 16.5 ppg cement blend submitted with the original sundry has not changed. If you have any questions or require further information, please do not hesitate to contact me directly. Regards, Joseph Longo Staff Drilling Engineer Office: 907-265-6824 Cell: 907-947-4323 Email: Joseph.J.Longo@conocophillips.com User ID: JJLONGO STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________GMTU MT7-03 JBR 01/12/2024 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:1 After waiting for 22 hours to test after initial test time test went well FP on audio for trip tank the system was in mute mode and they got that turned on. Test Results TEST DATA Rig Rep:E. Potter / Z. ColemanOperator:ConocoPhillips Alaska, Inc.Operator Rep:J. Benidict / L Shirley Rig Owner/Rig No.:Doyon 25 PTD#:2210240 DATE:11/15/2023 Type Operation:WRKOV Annular: 250/3500Type Test:INIT Valves: 250/5000 Rams: 250/5000 Test Pressures:Inspection No:bopKPS231116140231 Inspector Kam StJohn Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 10 MASP: 2918 Sundry No: 323-497 Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.P Test Fluid W Misc NA Upper Kelly 1 P Lower Kelly 1 P Ball Type 2 P Inside BOP 1 P FSV Misc 0 NA 15 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 0 NA Annular Preventer 1 13-5/8" X 500 P #1 Rams 1 2-7/8" X 5"P #2 Rams 1 Blinds P #3 Rams 1 2-7/8" X 5"P #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 3-1/8"P HCR Valves 2 3-1/8"P Kill Line Valves 2 3-1/8"P Check Valve 0 NA BOP Misc 0 NA System Pressure P3000 Pressure After Closure P1800 200 PSI Attained P15 Full Pressure Attained P86 Blind Switch Covers:PAll Stations Bottle precharge P Nitgn Btls# &psi (avg)P6 @ 1900 ACC Misc NA0 P FPTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector NA NAMS Misc Inside Reel Valves 0 NA Annular Preventer P24 #1 Rams P6 #2 Rams P6 #3 Rams P5 #4 Rams NA0 #5 Rams NA0 #6 Rams NA0 HCR Choke P2 HCR Kill P2 9 9 9 9 999 9 9 9 FP waiting for 22 hours to test FP on audio for trip tank 'R\RQ%23(7HVW *0780737' $2*&&,QVSERS.36 'R\RQ%23(7HVW *0780737' $2*&&,QVSERS.36 MT7-03 11/15/2023 Tested to 250PSI/5MIN, 5OO0 PSI/10MIN 4 1/2” Test Jt ( Chart #1) 1. Annular Preventer (3,500 PSI) 2. Upper pipe rams (2.87” x 5”), Valves: 1, 13, 14, 15, 4” Kill Line Valve (RIG FLOOR) 4” Dart Valve 3. Valves: 2,10, 12, HCR KILL, 4” FOSV #1 4. Valves: 6, 9, 11, Manual Kill, 4” FOSV #2, 5. Valves: 5,7,8, UIBOP 6. Valve: 3, LIBOP 7. Lower Pipe Rams (2.87” x 5” VBR’S) ( Chart #2) 8. Blind Shear Rams, Valve: 4 9. Manually Operated & Super Choke (9A= MANUAL Choke – 9B = SUPER Choke) 3 1/2” Test JT. 10.Annular Preventer (3,500 PSI) 11. Upper Pipe Rams (2.87” x 5” VBR’S) & HCR Choke, 12. Man Choke 13. Lower Pipe Rams (2.87” x 5” VBR’S) P.I. Supv Comm: Rig Coil Tubing Unit? No Rig Contractor Rig Representative Operator Operator Representative Well Permit to Drill # 2210240 Sundry Approval # 323-497 Operation Inspection Location Working Pressure, W/H Flange P Pit Fluid Measurement FP Working Pressure P P Flow Rate Sensor P Operating Pressure P P Mud Gas Separator P Fluid Level/Condition P P Degasser P Pressure Gauges P P Separator Bypass P Sufficient Valves P P Gas Detectors P Regulator Bypass P P Alarms Separate/Distinct P Actuators (4-way valves) P P Choke/Kill Line Connections P Blind Ram Handle Cover P P Reserve Pits P Control Panel, Driller P P Trip Tank P Control Panel, Remote P PFirewallP P 2 or More Pumps P P Kelly or TD Valves P Independent Power Supply P P Floor Safety Valves P N2 Backup P P Driller's Console P Condition of Equipment P P Flow Monitor P Flow Rate Indicator P Pit Level Indicators P Valves P PPE P Gauges P Remote Hydraulic Choke P Well Control Trained P Gas Detection Monitor P FOV Upstream of Chokes P Housekeeping P Hydraulic Control Panel P Targeted Turns P Well Control Plan P Kill Sheet Current P Bypass Line P FAILURES:1 CORRECT BY: COMMENTS The rig was in very good shape coming out of maintenace. All floor safety valves with correct thread or appropriate crossover. The BOP stack is new it is made by Worldwide Oilfield Machine; 13-5/8" X 5000psi RWP. Correct hoses and all safety equipment like targeted Tee's in place. The pusher was very helpful and walked me thru every section of the rig. During maintenance the choke manifold valves were all replaced along with the spool pieces; all were numbered matching schematics. The pit level sensors are new and the flow paddle was replaced with a sonar type indicator. The pit level sensor audio alarm was muted; resolved. Photo of BOPE stack data plate attached. CHOKE MANIFOLD Greater Mooses Tooth Unit MT7-3 MUD SYSTEM GMTU MT7-03 Workover CLOSING UNIT ALASKA OIL AND GAS CONSERVATION COMMISSION RIG INSPECTION REPORT HCR Valve(s) Manual Valves Annular Preventer Working Pressure, BOP Stack Stack Anchored Choke Line Kill Line Targeted Turns Pipe Rams Blind Rams E. Potter / Z. Coleman J. Benedict / L. Shirley Locking Devices, Rams BOP STACK Kam St.John 11/14/2023INSPECT DATE AOGCC INSPECTOR Immediately Doyon 25 Doyon ConocoPhillips Alaska MISCELLANEOUS Flange/Hub Connections Drilling Spool Outlets Flow Nipple Control Lines RIG FLOOR 2023-1114_Rig_Doyon25_GMTU_MT7-03_ksj rev. 4-19-2023 -%5 9 9 9 9Photo of BOPE stack data plate attached. 20 2 3 - 1 0 2 9 _ R i g _ D o y o n 2 5 _ G M T U _ M T 7 - 0 3 _ k s j Ri g I n s p e c t i o n – D o y o n 2 5 Gr e a t e r M o o s e s T o o t h U n i t M T 7 - 0 3 ( P T D 2 2 1 0 2 4 0 ) Ph o t o b y A O G C C I n s p e c t o r K . S t J o h n 10 / 2 9 / 2 0 2 3 Re p l a c e m e n t B O P s t a c k d a t a p l a t e 1. Type of Request:Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ___________________ 2. Operator Name:4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number):10. Field: Greater Mooses Tooth \ Rendezvous 11. Total Depth MD (ft):Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 21050 2918 N/A Casing Collapse Structural Conductor Surface 2260 Intermediate 1 4790 Intermediate 2 Liner 7030 Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): 12. Attachments:Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations:OIL WINJ WDSPL Suspended 16. Verbal Approval:Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Joseph Longo Contact Email:joseph.j.longo@concophillips.com Contact Phone: 907-947-4323 Authorized Title: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ConocoPhillips 221-024 P.O. Box 100360 Anchorage, Alaska, 99510-0360 50-103-20830-00-00 CO 793 Will perfs require a spacing exception due to property boundaries? Current Pools:Proposed Pools: AA081800, AA081803, AA081781 PRESENT WELL CONDITION SUMMARY MPSP (psi):Plugs (MD): 8176 21050 8176 N/A Length Size MD TVD Burst 3553 13-3/8"3553 3076 5020 120 20"120 120 Tubing Grade:Tubing MD (ft): 11624 7-5/8"11624 8304 6890 Authorized Name and Digital Signature with Date: Staff Drilling Engineer N/A N/A 4-1/2" Baker Premier Production Packer NO SSSV MT7-03 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. L80 12375 Production Packer - 11473' MD/ 8263' TVD NO SSSV 12375 4-1/2"12375 8405 8160 Perforation Depth MD (ft):Perforation Depth TVD (ft):Tubing Size: AOGCC USE ONLY Suspension Expiration Date: Subsequent Form Required: m n s 2 6 5 6 t _ c N Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov  By Grace Christianson at 1:01 pm, Aug 31, 2023 323-497 X SFD 9/7/2023 10-404 SFD X VTL 9/21/2023 X 9/15/2023 DSR-8/31/23 3523 SFD SFD BOP test to 5000 psig Annular preventer test to 2500 psig Plug for redrill not approved on this sundry; a separate sundry will be required. *&:JLC 9/21/2023 09/21/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.09.21 15:39:58 -08'00' RBDMS JSB 092223 ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, AK 99510-0360 Telephone 907-276-1215 August 31, 2023 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Re: Application for Sundry Approval MT7-03 Dear Sir or Madam, ConocoPhillips Alaska, Inc. hereby applies for sundry approval for the MT7-03 well on the MT7 drilling pad. The intended start of operations for this sundry is September 18, 2023. The MT7-03 single lateral northern injector was installed with an upper completion consisting of a tubing tail and production packer. The lateral was left barefoot. This sundry requests approval to cut to release the production packer on wireline and pull the existing upper completion with the Doyon 25 drilling rig. Using Doyon 25, an attempt will then be made to clean out and recover the existing lateral section and re-complete with a cemented 4-1/2” liner consisting of frac sleeves and swell packers. If it is not possible to recover the existing lateral a potential cement conformance job may be conducted prior to setting a kick off plug into to the existing 7-5/8” intermediate casing shoe. The subsequent sidetrack, production section re-drill and completion will be covered under a forthcoming MT7-03A Application for Permit to Drill. If you have any questions or require further information, please contact Joseph Longo at (907) 947-4323 (joseph.j.longo@conocophillips.com) or Greg Hobbs at 907-263-4749 (greg.s.hobbs@conocophillips.com). Regards, Joseph Longo Staff Drilling Engineer cc: MT7-03 Well File / Jenna Taylor ATO 1732 David Lee ATO 1552 Chris Brillon ATO 1548 Andy Mack Kuukpik Corp MT7-03 AOGCC 10-403 Sundry 8/31/2023 MT7-03 AOGCC 10-403 Sundry 1 | 11 MT7-03 PTD# 221-024 Application for Sundry Approval Table of Contents 1. Overview ............................................................................................................................................... 2 2. Planned Operations ............................................................................................................................... 3 3. Diverter and BOP Information ................................................................................................................ 4 4. MASP Calculations ................................................................................................................................. 4 5. Casing and Cementing Program .............................................................................................................. 5 6. Fluid Program ........................................................................................................................................ 7 7. Discussion of Mud and Cuttings Disposal and Annular Disposal .............................................................. 7 8. Hazards Summary .................................................................................................................................. 7 9. Present Well Schematic .......................................................................................................................... 8 10. Proposed Completion Schematic ............................................................................................................ 9 11. Area of Review..................................................................................................................................... 10 12. Intermediate Bond Log Review – ConocoPhillips Cementing SME Evaluation ........................................ 11 MT7-03 AOGCC 10-403 Sundry 8/31/2023 MT7-03 AOGCC 10-403 Sundry 2 | 11 1. Overview Due to conformance concerns between MT7-03 and offset production wells a mitigation effort will be made to install a cemented 4-1/2” liner in the existing 6-1/2” lateral. The existing 4-1/2” upper completion includes a 7- 5/8” x 4-1/2” Baker Premier production packer and a tubing tail that extends 751’ into the existing 6-1/2” open hole. Pre-rig wireline will cut the packer mandrel and secure the well prior to Doyon 25 rigging up. The existing completion will be pulled on rig. There is a known conformance zone at approximately 13830’ MD. The goal of this workover is to either clean out to our minimum required re-completion depth where a 4-1/2” liner will be cemented in place, reach our conformance area to remediate and prepare the well to be sidetracked, or in the event the conformance zone cannot be reached to prepare the well to be sidetracked. Below is our current decision tree. Sidetrack operations will be covered in a subsequent 10-401 application for permit to drill under MT7-03A. 3 Re-Enter Existing Wellbore CAN NOT Reach Conformance Zone +/- 14330' MD (13830' MD + 500') CAN NOT Reach ~19050' MD CAN Reach Min ~14330' MD CAN Reach Min ~19050' MD (~2000' from existing TD) - Set Kick Off Plug - OH Sidetrack - Re-Drill Lateral - Pump OH Thixotropic Conformance Job 1 - Run Liner - Cement with CTD Slurry 1 - DO NOTHING 4 - Run Sacrificial Liner - Cement with CTD Slurry 2 ACTUAL CONFORMANCE ZONE ~13830' MD With 500' Buffer ~14330' MD MINMUM REQUIRED RE-ENTRY DEPTH ~2000' From Current TD or ~19050' MD MD Distance 7-5/8" Shoe 11624 From Shoe Conformance Zone 13830 2206 + 500' Buffer 14330 2706 Min Re-Entry Depth 19050 7426 TD 21050 9426 Pump Thixotropic Conformance Job Prior to Liner Run? 2 ? CASE A CASE B CASE C Contingency operations for plugging this well for redrill require a separate Sundry Application. SFD 9/7/2023 MT7-03 AOGCC 10-403 Sundry 8/31/2023 MT7-03 AOGCC 10-403 Sundry 3 | 11 2. Planned Operations 1. Spot and rig up wireline unit. 2. Set tubing tail plug in lower nipple. 3. Pull dummy in lower GLM and leave pocket open to allow for a circulation point. 4. Cut packer mandrel on Baker Premier Production Packer. 5. Circulate KWF around and set BPV. 6. MIRU Doyon 25 onto MT7-03. 7. Install BOPE with the following equipment/configuration: 13-5/8” annular preventer, 2-7/8” x 5-1/2” VBR’s, blind ram and 2-7/8” x 5-1/2” VBR’s. 8. Test BOPE to 250 psi low / 5000 psi high (24-48 hr. regulatory notice) 9. Pull and lay down 4-1/2” tubing. 10. Pick up 6-1/2” clean out assembly and trip in hole to the 7-5/8” intermediate casing shoe. 11. Displace to WBM. 12. Attempt to clean out existing 6-1/2” lateral to ~19050’ MD or minimum required re-completion depth. x 12A – If unable to reach 13830’ MD (estimated depth of known conformance zone) – proceed to setting kick off plug into existing 7-5/8” intermediate casing. x 12B – If able to reach 14330’ MD, 500’ past the conformance zone, but unable to reach the minimum required re-completion depth, a sacrificial liner may be cemented in place over the conformance area. 1. TOOH and LD BHA 2. Pick up disconnect tool and sacrificial liner. TIH and cement in place over conformance area. 3. Proceed to setting kick off plug into existing 7-5/8” intermediate casing. x 12C – If successfully able to reach ~19050’ MD or minimum required re-completion depth. 1. TOOH and LD BHA 2. Run 4-1/2” liner on 4” DP. 3. Cement 4-1/2” Liner. 4. Set liner hanger and packer. Chart casing pressure test 3,500 psi. POOH LD DP. 5. Run 4-1/2” tubing with production packer, DHG, GLMs and 2x landing nipples. Locate and space out tubing. Terminate TEC wire and land tubing hanger. 6. Pressure test hanger seals to 2500 psi. 7. Drop ball & rod, pressure up and set production packer. 8. Pressure test tubing and IA and shear SOV. 9. Install BPV. ND BOPE and install tubing head adapter. Pressure test adapter to 5000 psi. VTL 9/20/2023 Submit plug for redrill sundry VTL 9/20/2023 Submit plug for redrill sundry Contingency operations 12A and 12B concerning plugging of this existing well for purposes of redrilling will require a separate Sundry Application. Operations related to drilling of any new wellbore will require a separate Permit to Drill. SFD 9/7/2023 MT7-03 AOGCC 10-403 Sundry 8/31/2023 MT7-03 AOGCC 10-403 Sundry 4 | 11 10. Install 10k frac tree and test. 11. Remove BPV and freeze protect well. 12. Secure well and RDMO. 3. Diverter and BOP Information Please reference BOP and diverter schematics on file for Doyon 25 4. MASP Calculations (A) maximum downhole pressure and maximum potential surface pressure; Maximum Potential Surface Pressure (MPSP) is determined as the lesser of: Method 1: surface pressure at breakdown of the formation casing seat with a gas gradient to the surface Method 2: formation pore pressure at the next casing point less a gas gradient to the surface Method 1 Method 2 ܯܲܵܲ = [(ܨܩ × 0.052 )െܩܽݏ ܩݎܽ݀݅݁݊ݐ] × ܸܶܦ ܯܲܵܲ = ܨܲܲ െ (ܩܽݏ ܩݎܽ݀݅݁݊ݐ) × ܸܶܦ Where: FG – Fracture gradient at the casing seat in lb/gal 0.052 – Conversion from lb/gal to psi/ft Gas Gradient – 0.1 psi/ft TVD – True Vertical Depth of casing seat in ft RKB Where: FPP – Formation Pore Pressure at the next casing point Gas Gradient – 0.1 psi/ft The following presents data used for calculation of Maximum Potential Surface Pressure (MPSP) while drilling: Section Hole Size Previous CSG Section TD MPSP psi MPSP MPSP Size MD TVD FG ppg Pore Pressure ppg | psi MD TVD Pore Pressure ppg | psi Method 1 psi Method 2 psi PROD 6-1/2" 4-1/2" 11624 8304 12.5 8.7 3,757 21040 8280 8.7 3,746 2,918 4,567 2,918 *Maximum potential pore pressure in the Susitna Sand if present (B) data on potential gas zones; The planned wellbore is expected to enter the gas cap and the area is expected to be normally pressured (8.5-8.9 ppg). (C) data concerning potential causes of hole problems such as abnormally geo-pressured strata, lost circulation zones, and zones that have a propensity for differential sticking; Please see Hazards Summary MT7-03 AOGCC 10-403 Sundry 8/31/2023 MT7-03 AOGCC 10-403 Sundry 5 | 11 5. Casing and Cementing Program Casing and Cementing Program OD (in) Hole Size (in) Weight (lb/ft) Grade Conn. Cement Program 20 42 94 H40 Welded Cemented to surface with 10 yds slurry 13-3/8" 16" 68# L80 H563 Previously Cemented – See Below 7-5/8" 9-7/8" x 11 29.7# / 33.7# L80 H563 / TXPM Previously Cemented – See Below 4-1/2" 6-1/2” 12.6# L80 H563 4-1/2" cemented liner including frac sleeves and potentially swell packers 13-3/8" Surface Casing run to 3553' MD/ 3076' TVD Cement Plan: Previously cement from 3553’ MD to 3053’ (500’ of tail) with DeepCRETE + Adds @ 15.8 ppg, and from 3053' to surface with 11.0 ppg DeepCRETE. 175 bbls returned to surface Lead 483 bbls => 1412 sx of 11.0 ppg DeepCRETE + Add's @ 1.92 ft³/sk Tail 72 bbls => 350 sx of 15.8 ppg Class G + Add's @ 1.16 ft³/sk 7-5/8" Intermediate Casing run to 11624' MD/ 8304' TVD Cement Plan: Previously cemented with a dual stage cement job. Primary stage was cemented from 11624’ MD with 61 bbls 15.8 ppg Class G to cover the Alpine C. The second stage collar was pumped thru the stage collar at 8748’ MD and consisted of 52 bbls 15.8 ppg Class G. TOC on the primary was confirmed at 11065’ MD (559’ of coverage). TOC on the secondary cement job was inconclusive. See bond log interpretation attached. Stage 1 61 bbls => 295 sx of 15.8 ppg Class G + Add's @ 1.16 ft³/sk Stage 2 52 bbls => 252 sx of 15.8 ppg Class G + Add's @ 1.16 ft³/sk 4-1/2” Production Liner run to Cement Plan: Top of slurry is designed to be at 11124’ MD, which is 500' above 7-5/8'' intermediate shoe. Assume 30% excess annular volume. This assumes that our minimum desired re-completion depth is reached. Tail 278 bbls => 1190 sx of 15.3 ppg GASBLOK CTD + Add's @ 1.31 ft³/sk MT 7 - 0 3 A O G C C 1 0 - 4 0 3 S u n d r y 8/ 3 1 / 2 0 2 3 M T 7 - 0 3 A O G C C 1 0 - 4 0 3 S u n d r y 6 | 1 1 We i g h t Y i e l d ft 3 bb l s ft 3 bb l s ft 3 bb l s ft 3 bb l s p p g ft 3/ S a c k La t e r a l L e n g t h + 5 0 0 ' 1 1 1 2 4 ' - 2 1 0 4 0 ' 9 9 1 6 0 . 0 2 1 3 0 % 1 1 9 0 2 1 1 . 9 2 3 5 7 6 3 . 5 8 0 0 1 5 4 7 2 7 5 . 5 0 1 1 8 1 1 5 . 3 p p g G A S B L O K C T D 1 . 3 1 Sh o e T r a c k 2 0 9 2 0 ' - 2 1 0 4 0 ' 1 2 0 0 . 0 1 5 0 % 1 0 1 . 8 3 0 0 . 0 0 0 0 1 0 1 . 8 3 8 1 5 . 3 p p g G A S B L O K C T D 1 . 3 1 12 0 0 2 1 3 . 7 5 3 5 7 6 3 . 5 8 0 0 15 5 7 2 7 7 . 3 2 1 1 8 9 1 5 . 3 p p g G A S B L O K C T D 1 . 3 1 To t a l T a i l V o l u m e = 2 7 5 . 5 0 + 1 . 8 3 b b l s = 2 7 7 . 3 2 b b l s = > 1 , 1 8 9 s x o f 1 5 . 3 p p g G A S B L O K C T D @ 1 . 3 1 f t ³ / s k Ad d i t i o n a l b b l s To t a l V o l u m e Sa c k s B l e n d Ta i l Fo o t a g e Pl a c e m e n t bb l / f t % E x c e s s Vo l u m e XS V o l u m e Pr o d u c t i o n L i n e r MT7-03 AOGCC 10-403 Sundry 8/31/2023 MT7-03A AOGCC 10-401 APD 7 | 11 6. Fluid Program Production Hole Size in 6-1/2" Casing Size in 4-1/2" Density ppg 8.8 – 9.5 PV cP 15 YP lb./100 ft2 15 - 20 Funnel Viscosity s/qt 60 - 80 Initial Gels lb./100 ft2 10 10 Minute Gels lb./100 ft2 15 API Fluid Loss cc/30 min 4 HPHT Fluid Loss cc/30 min 10.0 pH 9.0 – 9.5 Production Hole: The horizontal production interval will be cleanout with water-based mud drill-in fluid weighted to 8.8-9.5 ppg. MPD will be used to hold back pressure, keeping the well dynamically balanced. Diagram of Doyon 25 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations. 7. Discussion of Mud and Cuttings Disposal and Annular Disposal Incidental fluids developed from drilling operations on well MT7-03 will be disposed of into a permitted annulus on the MT7 pad or hauled to the Class 1 disposal well on CD1. 8. Hazards Summary 6-1/2" Hole | 4-1/2" Liner - Horizontal Production Hole Event Risk Level Mitigation Strategy Lost circulation Low Reduce pump rates, reduce trip speeds, real time ECD monitoring, mud rheology, add lost circulation material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, proper hole filling, pump out of hole, real time ECD monitoring Abnormal Reservoir Pressure Low Well control drills, check for flow during connections, increased mud weight Differential Sticking Low Uniform reservoir pressure along lateral, keep pipe moving, control mud weight Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers e horizontal production interval w cleanout MPD will be used to hold back pressure, MT7-03 AOGCC 10-403 Sundry 8/31/2023 MT7-03A AOGCC 10-401 APD 8 | 11 9. Present Well Schematic MT7-03 AOGCC 10-403 Sundry 8/31/2023 MT7-03A AOGCC 10-401 APD 9| 11 10. Proposed Completion Schematic MT7-03 Single Lateral Injector UPPER COMPLETION: 1. 4-½” X Landing Nipple (3.813" ID) 2. 4-½” x 1" KBG 4-5 (3x – 1 SOV, 2 DV) 3. 4-½” X Landing Nipple (3.813" ID) 4. HES Opsis Downhole Gauge 5. HES TNT Packer 6. 4-½” DB Landing Nipple (3.75" ID) RECOMPLETE DRAFT -WP02 RKB = 140.7’ AMSL JJLONGO - 8/30/2023 Surface Casing 13-3/8" 68# L80 H563 3553' MD/ 3076' TVD Cemented to Surface Lead: 11.0 ppg DeepCRETE | Tail: 15.8 ppg Class G 4-1/2" 12.6# L80 H563 Production Tubing Intermediate I Casing 7-5/8" 29.7# L80 H563 x 7-5/8" 33.7# L80 TXPM 11624' MD/ 8304' TVD 4-1/2" 12.6# L80 H563 21035' MD / 8280' TVD 6-1/2" Production Hole 21040' MD/ 8280' TVD 4-1/2" 12.6# L80 H563 Swell Packer and sleeve positioning will be optimized based on as-drilled data 7-5/8" x 4-1/2" Production Packer 11329' MD / 8216' TVD HRDE ZXHD Liner Top PKR 11449' MD / 8256' TVD MT7-03 AOGCC 10-403 Sundry 8/31/2023 MT7-03A AOGCC 10-401 APD 10 | 11 11. Area of Review Casing and Cementing Program Well Name Status Top Alpine MD / TVD TOC MD / TVD TOC Method Reservoir Status Zonal Isolation Cement Ops Summary MT7-05 Producing 12303’ / 8310’ 11900’ / 8185’ Sonic LWD Liner TOC & Packer 52 bbls 15.8 ppg Class G MT7-01 Producing 10802’ / 8337’ 9994’ / 7974’ Sonic LWD Liner TOC & Packer 50 bbls 15.8 ppg Class G MT7-05 intermediate 2 section was drilled and cased with 7” liner down to 12252’ MD in the Alpine D. The Alpine C zone was penetrated at 12303’ MD. The intermediate casing was cemented to isolate the Alpine pool with 52 bbls of Class G cement (plugs bumped and floats held) and top of cement was measured via Sonic LWD at 11900’ MD. A horizontal production section was drilled in the Alpine C to 21916’ MD and completed with a liner. MT7-01 intermediate 2 section was drilled and cased with 7” liner down to 10727’ MD in the Alpine D. The Alpine C zone was penetrated at 10802’ MD. The intermediate casing was cemented to isolate the Alpine pool with 50 bbls of Class G cement (plugs bumped and floats held) and top of cement was measured with a Sonic LWD at 9994’. A horizontal production section was drilled in the Alpine C to 19645’ MD and completed with a liner. MT7-03 AOGCC 10-403 Sundry 8/31/2023 MT7-03A AOGCC 10-401 APD 11 | 11 12. Intermediate Bond Log Review – ConocoPhillips Cementing SME Evaluation Stage 1: We appear to have near pristine cement to at least 11,050’ based on the very low amplitude. Based on the response this looks like very high quality cement capable of reliable isolation. Due to the loss of returns it now becomes difficult to ascertain the exact nature of the materials above this, although we can see differences in the materials behind pipe. Lift pressure analysis and fluid displacement predictions are not reliable when lost circulation events occur. Due to the amount and apparent high quality of the cement around the shoe I would consider it risky, if not hazardous, to attempt any type of remediation by way of perforations for an additional 100’ of isolation. Stage 2 I have reviewed the lift pressure analysis for stage II, along with the pre-job predictions. When I look at the pre-job predictions I look closely at the fluid friction pressure hierarchy chart. This chart tells if the fluids exert enough shear stress to displace the fluid(s) in front of it. In our case this is a very positive indicator that the fluid regime was in proper alignment for a good displacement. This if further enforced by the mud removal predictions and fluid concentration charts which predict a high percentage of cement in the annulus above the stage tool. Although not the best Cement Evaluation Log we have seen there are indications of a change in material in the annulus upward to 8,000’. This would be very close to the predicted top of spacer at 8400’. Additionally we did not lose returns and the job was executed properly. Based on previous logs reviewed on the stage II operation I feel confident that our cement job is place as expected and will meet our expectations. Jenne Taylor Senior Wells Analyst Wells ConocoPhillips July 13th, 2023 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Annular Disposal Reports, Second Quarter, 2023 To whom it may concern: P. 0. Box 100360 An ch orag e, AK 99510-0360 Phone: 907-263-4749 Please find attached second quarter2023 annulardisposal reports for Greater Moose's Tooth Unitwells. These reports show the volumes disposed into surface casing by production casing annuli during the second quarter of 2023. There were no disposal operations in the reporting period for MT7-03. Future sundries will follow fordrilling operations on the MT7 Pad. A corrected first quarter annular disposal sundry for MT7-02 is attached. During the first quarter, a volume of 25 bbls of diesel was injected for freeze protect operations. Please call Jenna Taylor at 907-263-4522 should you have any questions. Sincerely, Digitally signed by Jenne Taylor Jenna DN nv,a0'na Taylor. E_ Reason Ia the a0hpbllll this Reason am me awnor onnla dacumem `°ea°°° Tailor Dale'. M3.07. 141523:41 (ebi) Fo.¢ aor emmr version: i z.i.z Jenna aylor Senior Wells Analyst Attachments: Q2 MT7-03 10-423 Q2 MT7-02 10-423 Q1 MT7-02 10-423 "corrected Digitally signed by Jenna Taylor DN: CN=Jenna Taylor, E=jenna.l.taylor@conocophillips.com Reason: I am the author of this document Location: Date: 2023.07.14 15:32:16-08'00' Foxit PDF Editor Version: 12.1.2 Jenna Taylor April 17th, 2023 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Annular Disposal Reports, First Quarter, 2023 To whom it may concern: Please find attached the first quarter 2023 annular disposal report for Greater Moose’s Tooth Unit wells. These reports show the volumes disposed into surface casing by production casing annuli during first quarter of 2023. There were no disposal operations in the reporting period. Future sundries will follow for drilling operations on the MT7 Pad. Please call Jenna Taylor at 907-263-4522 should you have any questions. Sincerely, Jenna Taylor Senior Wells Analyst Attachments: MT7-03 10-423 MT7-02 10-423 Jenna Taylor Senior Wells Analyst Wells P. O. Box 100360 Anchorage, AK 99510-0360 Phone: 907-263-4749 221-024 7. Well Name: 5a. Sundry Number: 322-025/322-473 10 (h)(1) drilling mud, drilling cuttings, reserve pit fluids cement-contaminated drilling mud, completion fluids, formation fluids and any necessary water added. (h)(2) drill rig wash fluids and drill rig domestic waste water (h)(3) Other Commission approved substances (include descriptions in block 12) Volume (bbls):Number of days disposal occurred: Disposal Beginning Dates: Disposal Ending Dates: Source Wells: Previous totals (bbls): 52964 9094 2291 64984 48 03/15/22 12/11/22 2023/Q1 0 0 0 0 0 2023/Q2 2023/Q3 2023/Q4 Total Ending Volume (bbls): 0 0 0 64984 0.00 Other (Explain) 2. Address:4b. Well Status: Oil Gas WAG 50-103-20830-00-00 MT7-03 PO Box 100360, Anchorage, Alaska Initial Disposal Continuation Final 4a. Well Class: Stratigraphic Service GINJ WINJ WDSPL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF ANNULAR DISPOSAL Development Exploratory 6. Permit to Drill Number: 8. API Number: 1. Operator: 5b. Sundry approval date: 1/25/2022 9. Field:Greater Mooses tooth3. (Check one box only) ConocoPhillips Alaska, Inc. Title: Senior Wells Analyst Contact Phone: 907-263-4522Certified Signature: Contact Email: jenna.l.taylor@cop.com Report is due on the 20th of the month following the final month of the quarter. Ex: April 20 for the first quarter. The report will be submitted each quarter, even with zero volumes, until the application expires. Date of Revision: I hereby certify that the foregoing is true and correct to the best of my knowledge. Name: Jenna Taylor Revision? 12. Remarks and Approved Substances Description(s): Diesel for Freeze Protect Operations 11. Attach Required Disposal Performance Data: Pressure vs. Time Step Rate Test No disposal in Q1 Form 10-423 Revised 3/2021 20 AAC 25.080(f)Submit in PDF format to aogcc.reporting@alaska.gov 7. Publicly recorded wells a) All wells within one-quarter mile:a) Interval exposed to open annulus: b) Waste receiving zone: c) Confinement: 17. Attachments: Well Schematic (Include MD and TVD) Cement Bond Log (if required) FIT Records w/ LOT Graph Surf. Casing Cementing Data Other Contact Name:Nina Anderson Contact Email:nina.anderson@cop.com Contact Phone: 907-229-4008 Date: Conditions of approval: Date: Comm. Comm. Sr Pet Eng Sr Pet Geo UIC Mgr Sr Res Eng 14. Estimated volume to be disposed with this request: 80,000 BBLS MT7-04, MT7-06, MT7-01, MT7-05, MT7-96 MT7-02, MT7-99, MT7-09, MT7-07 MT7-08, MT7-97, MT7-11, MT7-98 Shallow marine sediments, sandstone & siltstone in the Nanushuk. Slope to deep marine sediments, mainly marine shale with interbedded tubiditic sands in Torok Nanushuk K-3 sand The upper confining barrier is Colville; medium gray claystone with siltsone lenses. Lower confining barrier is Torok; marine shale, interbedded siltstone & sandstone. 16. Estimated start date: April 3rd, 2023 15. Fluids to be disposed: Types of waste may be drilling mud, drilling cuttings, reserve pit fluids, cement- contaminated drilling mud, completion fluids, diesel, formation fluids associated with the act of drilling a well, drill rig wash fluids, cement rinsate, domestic waste water, any added water needed to facilitate pumping of drilling mud or drilling cuttings, and other substances such as RA tracer that the commissioner determines on application are wastes associated with the act of drilling a well permited under 20 AAC 25.005. b) Water wells within one mile: None 12. Estimated slurry density: Densities range from diesel to 12#/gal 13. Maximum anticipated pressure at shoe: 2867 psi 11. Previous volume disposed in annulus and date: 64,983 bbls on 12/11/2022 9. Depth to base of permafrost: approximately 978’ MD and 976’ TVD 10. Hydrocarbon zones above waste receiving zone (MD/TVD): None 5. Well Name: MT7-03 Authorized Name: Authorized Title: Authorized Signature: 18. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. P.O. Box 100360, Anchorage, Alaska 99510-0360 8. Stratigraphic description: 6. Field: Greater Mooses Tooth RA Tracer MSDS 2. Address: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ANNULAR DISPOSAL APPLICATION 20 AAC 25.080 1. Operator Name: ConocoPhillips Alaska 3. Permit to Drill Number: 4. API Number: 221-024 50-103-20803-00-00 APPROVED BY THE COMMISSION COMMISSION USE ONLY COMMISSIONER LOT review and approval: Approved by: Subsequent form required: 10-423 Sundry Number: Form 10-403AD Rev 3/2021 Approved application is valid for 12 months from the date of approval. Chris Brillon Wells Engineering Manager 323-206 By Kayla Junke at 4:26 pm, Apr 05, 2023 SFD 4/7/2023 50-103-20830-00-00 SFD April 3rd, 2023 GCW 04/12/23JLC 4/12/2023 04/12/2023 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.04.12 16:52:36 -08'00' RBDMS JSB 041423 ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 April 5, 2023 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 Re: Application for Sundry Approval for Outer Annulus Disposal RA Tracer Log on MT7-03 Dear Sir or Madam: ConocoPhillips Alaska, Inc. hereby requests a onetime approval to pump RA tracer down the currently approved annular disposal well MT7-03 (Sundry # 322-473) to verify the depth of disposal fluids into the Annular Disposal Zone below the Surface Casing shoe set at 3523 MD /3056 TVD. It is requested that the volume limit described in 20-ACC 25.080 d.1. be increased from the 70,000 BBLS approved volume to a total of 80,000 BBLS. This additional volume will cover the potential volume needed for this procedure. Current volume pumped as of Dec 11th 2022 is 64,983 BBLS. It is intended to perform logging operations on MT7-03 during early April of 2023, by pumping ~ 2 cups of fluid with 8 miCi of Ir-192 Zero Wash down the 13-3/8” x 7-5/8” outer annulus followed by water flush. Eline will be used to log multiple passes through tubing above and below the surface casing shoe. Attached is an updated plot showing all the wells within a quarter mile of the surface shoe on MT7-03. Additional information regarding wells within ¼ mile radius that have not previously been submitted to the AOGCC are included. Also, attached is the updated annular disposal transmittal form. For additional details please reference the initial annular disposal sundry from MT7-03 approved on January 25, 2022. (Sundry #322-025) Please find attached form 10-403AD and other pertinent information as follows: 1. MT7-03 10-403 AD 2. MT7-03 Annulus Disposal Transmittal Form with updates to Table row 5 and 6 3. MT7-03 Logging Procedure 4. MT7-03 Schematic 5. RA Tracer Information 6. MT7 Table of wells and the lateral distance from the surface casing shoe 7. MT7-03 surface Casing Quarter Mile Plot Plan View 8. Information regarding remaining wells within ¼ mile radius including: MT7-08, MT7-97, MT7-98, MT7-11If you have any questions or require further information, please contact Nina Anderson at 229-4008 or Chris Brillon can also be reached by calling 265-6120. Sincerely, Nina Anderson ConocoPhillips Wells Staff Drilling Engineer cc: MT7-03 Well File AOGCC Regulations, 20 AAC 25.080 (b) 1 Designation of the well or wells to receive drilling wastes:MT7-03 2 The depth to the base of freshwater aquifers and permafrost, if present. There are no USDW aquifers in the Greater Mooses Tooth Unit. Estimated base of Permafrost = 980’ TVD (RKB) 3 A stratigraphic description of the interval exposed to the open annulus and other information sufficient to support a commission finding that the waste will be confined and will not come to the surface or contaminate freshwater. The Colville confining barrier consists of medium gray claystone with some siltstone lenses. The planned disposal interval of the Nanushuk K-3 sand consists of shallow marine sediments, predominantly sandstone and siltstones. The lower confining barrier of the Torok formation consists mainly of marine shale with interbedded siltstone and sandstone. Calculated water salinities in the overlying Colville group range from 27,000-31,000ppm, calculated salinities in the corresponding K-3 and K-2 interval range from 13,000- 18,000 ppm, and calculated salinities in the underlying Torok range from 13,000-24,000ppm (Ref. AOGCC Conservation Order No. 793, Appendix 2 of CPAI Application, July 13, 2021). 4 A list of all publicly recorded wells within one-quarter mile and all publicly recorded water wells within one mile of the well to receive drilling waste. See attached map indicating wells within 1/4 mile. There are no water wells within 1 mile. 5 Identify the types and maximum volume of waste to be disposed of and the estimated density of the waste slurry. Types of waste may be drilling mud, drilling cuttings, reserve pit fluids, cement-contaminated drilling mud, completion fluids, diesel, formation fluids associated with the act of drilling a well, drill rig wash fluids, domestic waste water, any added water needed to facilitate pumping of drilling mud or drilling cuttings, RA tracers, and any other fluids associated with drilling a well. Densities range from diesel to 12#/gal. Maximum volume to be pumped is 80,000 bbls. 6 A description of any waste sought to be determined as drilling waste under (h)(3) of this section. Cement rinsate, mud plant rinse fluid generated by rinsing tanks, equipment from producing drilling/completion fluid (see included note), and RA tracer for specific logging operations. 7 An estimate of maximum anticipated pressure at the outer casing shoe during annular disposal operations and calculations showing how this value was determined. Maximum anticipated pressure at the outer casing shoe during disposal operations is 2867 psi. See attached calculation page. 8 Details that show the shoe of the outer casing is set below the base of any freshwater aquifer and permafrost, if present, and cemented with sufficient cement to provide zone isolation: See attached: cementing reports, LOT / FIT reports and casing reports. 9 Details that show the inner and outer casing strings have sufficient strength in collapse and burst to withstand anticipated pressure of disposal operations: See attached casing summary sheet and calculation pages. 10 The downhole pressure obtained during a formation integrity test conducted below the outer casing shoe. See attached LOT/FIT report. 11 Identification of the hydrocarbon zones, if any above the depth to which the inner casing is cemented. The top of cement is 7400' MD in the intermediate casing which covers the uppermost hydrocarbon bearing zone. No hyrdrocarbon bearing zones have been identified above this depth 12 The duration of the disposal operation, not to exceed 90 days.N/A 13 Whether drilling waste has previously been disposed of in the annular space of the well and, if so, a summary of the dates of the disposal operations, the volumes of waste disposed of, and the wells where the drilling waste was generated. N/A 14 The well(s) where the drilling waste to be disposed of was or will be generated. MT7-98, MT7-99, MT7-06, MT7-08, MT7-10, MT7-97, MT7-11, MT7-12 15 If the operator proposes not to comply with a limitation established in (d) of this section, an explanation of why compliance would be imprudent. N/A 16 Any additional data required by the commission to confirm containment of drilling waste. N/A Annulus Disposal Transmittal Form - Well MT7-03 Agree. SFD 4/5/2023 HES Cementer Stage Tool Set at 8748' MD, CPAI's estimated TOC ~7,400' MD. SFD 4/7/2023 No USDWs. See CO 793, Conclusion 5. SFD 4/5/2023 Preliminary Logging Procedure for MT7-03 with RA Tracer: 1. Rig up E-Line to MT7-03 and Pressure Test. 2. Rig up and pressure test hardline from the pumping unit to the 13-3/8” x7-5/8” outer annulus on MT7-03. Tie into the CoreLab RA tracer manifold downstream of the pumping unit. 3. Perform an injec vity test with diesel down the OA. Maximum surface injec on pressure is calculated from the current Ňuid gradient in the annulus and the 18.0 EMW FIT at the surface shoe. Maximum An cipated Pressure at the Surface Casing shoe is 2866 psi. The OA currently has 76 bbls of diesel and 252 bbls of water. 4. RIH with Eline and logging tools to ~ 5000’ MD to gather baseline log. 5. Pull up hole to ~ 10 feet above the surface casing shoe at 3523’ MD. 6. Begin Injec ng water down the OA with pumping unit and stabilized rates of 1-2 bpm at pressures below calculated max. 7. Once rates are stabilized, pump the RA tracer slug followed with water pumping at pressures below calculated max. 8. Begin logging and taking sta on measurements above and below the surface casing shoe to determine the injec on zone. 9. Perform logging passes above the surface casing shoe to determine any extent of upward Ňuid movement. 10. Once depth of injec on has been determined, begin freeze protect opera ons pumping diesel down the OA. 11. Record the total volumes, Ňuid type, and pressures of all Ňuids during pumping opera ons down the OA. 12. RDMO Completion: 1) 4-1/2” Landing Nipple (3.813" X) 2) 4-1/2” x 1” GLM 3) 4-1/2” x 1” GLM 4) HES DHG 5) Premier Production Packer 6) 4-1/2” Landing Nipple (3.75" DB) 7) Baker Frac Sleeve 8) Perf Joints 9) Northern Solutions Dissolving Shoe 4-1/2” 12.6# L-80 TXP tubing tail with perf joints 20" 94 ppf H-40 Insulated Conductor 120 feet, cemented to surface 4-1/2" 12.6# L-80 Hyd563 X GLGL 16" Surface Hole 9-7/8" x 11" Intermediate Hole 6-½” Production Hole MT7-03 - 3 String Injector, As-Drilled Schematic All depths are based on RKB 13-3/8" 68# L-80 HYD 563 x BTC-M Surface Casing @ 3,523' MD / 3,056' TVD 7-5/8" 29.7# L-80 HYD563 x 7-5/8" 33.7# L-80 TXP-BTC- SR INT Casing @ 11,624' MD / 8,304' TVD Production Hole TD 21,050' MD / 8,176' TVD Production Packer 11,473' MD / 8,263' TVD TOC @ 11,065' MD / 8,113' TVD HES Cementer Stage Tool Set at 8748' MD, CPAI's estimated TOC ~7,400' MD. SFD 4/7/2023 SAFETY DATA SHEET Date-Issued: 05-2015 SDS Ref. No: ZW Date-Revised: 5/31/15 Revision No:001 1. PRODUCT AND COMPANY IDENTIFICATION 1.1 Product Identifiers Product name : Zero Wash Tracer Product number : NA Generic name : IRZW, SCZW, SBZW, and low Density (LD) 1.2 Relevant identified used of the substance or mixture and uses advised against Identified uses : Diagnostic Uses advised against : Not available 1.3 Details of the supplier of the safety data sheet Company : ProTechnics Division of Core Laboratories 6510 W. Sam Houston Parkway N. Houston, Texas 77041 Telephone : 713-328-2320 1.4 Emergency telephone number Emergency phone number : 713-328-2320 Transportation emergency : 1-800-535-5053 (inside US) 1-352-323-3500 collect (outside US) 2. HAZARDS IDENTIFICATION 2.1 Classification of the substance or mixture GHS classification in accordance with 29 CFR 1910 (OSHA HCS) Not Classified- Radioactive Material 2.2 GHS Label elements, including precautionary statements Pictogram Signal word None Associated Radioactive Material Hazard statement(s) No hazard statement associated- Radioactive Material. Zero Wash is a small bead that emits low gamma radiation in small quantities Precautionary statement(s) 2.3 Hazards not otherwise classified (HNOC) or not covered by GHS - Radioactive Material 3. COMPOSITION / INFORMATION ON INGREDIENTS 3.1 Substances Substance/ mixture Mixture 4. FIRST AID MEASURES 4.1 Description of first aid measures General advice Move away from source. Use ALARA- Time, Distance, Shielding If inhaled Not respirable In case of skin contact Remove from contact with skin. Keep distance In case of eye contact Immediately flush eyes with plenty of water for two to three minutes. Remove any contact lenses and continue flushing for 15 minutes. If irritation continues, consult a physician. If swallowed Consult a physician. 4.2 Most important symptoms and effects, both acute and delayed No side effects known with short term, avoid long term exposure. 4.3 Indication of any immediate medical attention and special treatment needed Remove bead and place in shielding or create distance. 5. FIRE FIGHTING MEASURES 5.1 Extinguishing media Suitable extinguishing media Carbon Dioxide or Halon (This reduces the spread of Zero Wash material). 5.2 Special hazards arising from the substance or mixture NA 5.3 Advice for firefighters Low activity Gamma emitting radioactive material-low exposure Ingredient CAS/Exempt No Percent Hazardous Ceramic Proppant Proprietary 100 Yes 6. ACCIDENTAL RELEASE MEASURES 6.1 Personal precautions, protective equipment and emergency procedures 6.2 Environmental precautions . CONTROL THE AREA. Rubber gloves, boots and safety glasses should be worn when handling. 6.3 Methods and materials for containment and cleanup Clean up spill area by scooping up spilled material and transfer to a container. If clothing indicates the presence of Zero Wash material, remove the bead with adhesive tape, hold tape containing bead for decay in proper storage area. If numerous beads are found on clothing, remove clothing and place in a container for later cleaning or disposal. When any spill or release occurs, ProTechnics should be notified (713-328-2320) to supervise clean-up efforts. 7. HANDLING AND STORAGE 7.1 Precautions for safe handling Only ProTechnics Trained tracer supervisors should handle this material as they are trained in how to contain, remove and find the material. 7.2 Conditions for safe storage Normal 7.3 Specific end uses(s) Diagnostic. 8. EXPOSURE CONTROLS / PERSONAL PROTECTION 8.1 Control parameters Components with workplace control parameters Non radiation workers should avoid any contact with material. Restricted area for use should be set at 2mR/hr and prevent any unintentional exposure 8.2 Exposure controls Appropriate engineering controls Material stored in lead lined containers and used in restricted areas only. Only trained Tracing supervisors have access and control of the material Personal protective equipment Eye/face protection Safety glasses with side-shields conforming to EN166. Use equipment for eye protection tested and approved under appropriate government standards such as NIOSH (US) or EN166 (EU). Skin protection Handle with chemical-resistant gloves. Gloves must be inspected prior to use. Use proper glove removal technique (without touching glove’s outer surface) to avoid skin contact with this product. Dispose of contaminated gloves after use in accordance with applicable laws and good laboratory practices. Wash and dry hands. Body protection Standard FRC should be adequate and use of proper surveying techniques used when material is being used. Control of environmental exposure All material should be captured and managed by ProTechnics, if material is noticed by survey please contact ProTechnics at 713-328-2320 9. PHYSICAL AND CHEMICAL PROPERTIES 9.1 Information on basic physical and chemical properties a) Appearance Form: Small grey colored ceramic bead Color: grey b) Odor Odorless c) Boiling point NA d) Freeze point NA e) Density/Specific Gravity 2.6 g/mL f) Flash point Not flammable g) pH Not available h) Evaporation factor Not determined i) Solubility not Soluble in water j) Vapor pressure Not determined k) Oxidizing properties Not determined l) Vapor density Not determined m) Viscosity Not determined 9.2 Other safety information No data available. 10. STABILITY AND REACTIVITY 10.1 Reactivity NA 10.2 Chemical stability The product is stable under normal ambient conditions of temperature and pressure. 10.3 Possibility of hazardous reactions Will not polymerize. 10.4 Conditions to avoid Combination of material with more like material could increase exposure levels. The smaller the amount the lower the exposure rates should be. 10.5 Incompatible materials NA 10.6 Hazardous decomposition products None. All ZW material decay to stable state. 11. TOXICOLOGICAL INFORMATION 11.1 Information on toxicological effects Acute toxicity – oral May cause Eye and Mucous membrane irritation. . Ingestion is the only method of internal consumption. Acute toxicity – dermal Irritation or itching of the skin. Acute toxicity – inhalation ZERO WASH particle is too large to inhale. Skin corrosion/irritation NA. Serious eye damage/irritation NA Respiratory sensitization ZERO WASH particle is too large to inhale Skin sensitization Irritation or itching of the skin. Germ cell mutagenicity Genotoxicity – in vitro Based on available data the classification criteria are not met. Genotoxicity- in vivo Based on available data the classification criteria are not met. Carcinogenicity IARC: No component of this product present at levels greater than or equal to 0.1% is identified as probable, possible, or confirmed human carcinogen by IARC. ACGIH: No component of this product present at levels greater than or equal to 0.1% is identified as a carcinogen or potential carcinogen by ACGIH. NTP: No component of this product present at levels greater than or equal to 0.1% is identified as a known or anticipated carcinogen by NTP OSHA: No component of this product present at levels greater than or equal to 0.1% is identified as a carcinogen or potential carcinogen by OSHA. Reproductive toxicity Reproductive toxicity – fertility Based on available data the classification criteria are not met. Reproductive toxicity – development Based on available data the classification criteria are not met. Specific target organ toxicity – single exposure Low doses not applicable Specific target organ toxicity – repeated exposure Internal-possible gamma exposure Aspiration hazard Not anticipated to present an aspiration hazard, based on Physical structure. To the best of our knowledge, the chemical, physical, and toxicological properties have not been thoroughly investigated. 12. ECOLOGICAL INFORMATION 12.1 Toxicity NA. 12.2 Persistence and degradability Half life: IRZW-74 days, SCZW-84 days, SBZW-60 days 12.3 Bioaccumulative potential No data available. 12.4 Mobility in soil Zero Wash does not plate and will not breakdown in soil. 12.5 Results of PBT and vPvB assessment PBT/vPvB assessment are not available as chemical safety assessment not required/ not conducted. 12.6 Other adverse effects No data available. 13. DISPOSAL CONSIDERATIONS 13.1 Waste treatment methods Product DISPOSAL METHOD: Dispose of waste at an appropriate waste disposal facility according to current applicable laws and regulations. PRODUCT DISPOSAL: Dispose of at a supervised appropriate waste disposal facility according to current applicable laws and regulations and product characteristics at time of disposal. EMPTY CONTAINER: Contaminated containers should be cleaned and disposed of in the same manner as the product in accordance with applicable regulations. GENERAL COMMENTS: Refer to Section 6, Accidental Release Measures for additional information. Contaminated packaging Contaminated containers should be cleaned and disposed of in the same manner as the product in accordance with applicable regulations. Please contact ProTechnics for Disposal guidance at 713-328-2320 14. TRANSPORT INFORMATION DOT (US) DOT (DEPARTMENT OF TRANSPORTATION) PROPER SHIPPING NAME: Radioactive material, type A package TECHNICAL NAME: Zero Wash Tracer LABEL: Diamond. Hazard Class/Division: 7 United Nations number: 2915 IMDG VESSEL (IMO/IMDG) PROPER SHIPPING NAME: Radioactive material, type A package TECHNICAL NAME: Zero Wash Tracer LABEL: Diamond. United Nations number:2915 IATA AIR -Forbidden on Passenger carrying aircraft. PROPER SHIPPING NAME: Radioactive material, type A package TECHNICAL NAME: Zero Wash Tracer LABEL: Diamond Hazard Class/Division: 7 United Nations number:2915 . 15. REGULATORY INFORMATION SARA 302 Components SARA 302: No chemicals in this material are subject to the reporting requirements of SARA Title III, Section 302. SARA 313 Components SARA 313: This material does not contain any chemical components with known CAS numbers that exceed the threshold (De Minimis) reporting levels established by SARA Title III, Section 313. SARA 311/312 Hazards SAR 311/312: No chemicals in this material are subject to the reporting requirements of SARA Title III, Section 311/312. CERCLA (Comprehensive Response, Compensation, and Liability Act) Not Applicable. TSCA (Toxic Substance Control Act) Not Applicable. . 16. OTHER INFORMATION HMIS Rating Health Hazard: 1 Chronic Health Hazard: 1 Flammability: 0 Physical Hazard: 0 NFPA Rating Health Hazard: 1 Fire Hazard: 0 Reactivity Hazard: 0 MANUFACTURER DISCLAIMER: Information given herein is offered in good faith as accurate, but without guarantee. Conditions of use and suitability of the product for particular uses are beyond our control; all risks of use of the product are therefore assumed by the user. Nothing is intended as a recommendation for uses which infringe valid patents or as extending license under valid patents. Appropriate warnings and safe handling procedures should be provided to handlers and users. Prepared by: ProTechnics Environmental Compliance Department Date of revision: 05/31/2015 Contact information: 713-328-2320 South(-)/North(+) (400 usft/in) MT7-03XYSurface Casing Shoe ASP 4 Coordinates NAD 83: 1429504.28 5914329.28WellsDetails @ AOGCCAnn. Disp. Permit #Permit DateSource wellAnn. Vol. **Start Date End DateDistance from Object well* Surface csgShoe X Coord.Surface csg. Shoe Y CoordSurf LOT (ppg)Surface casing TVD (ft)Annular LOT (ppg)CommentsMT7-04Y756.451429111.095914975.5116.8305115.60Not eligible for a candidate MT7-03Y322-0251/25/2022, 8/8/2022MT7-07 MT7-09 MT7-98MT7-0864,9833/15/20220.00 1429504.28 5914329.28 18.0 3057 15.80Volume extension to 70,000 bbls submitted 8/8/2022MT7-06Y831.081428965.365914961.9418.5305514.60SidetrackedMT7-01Y205.191429706.935914361.4718.6305014.40MT7-05Y176.021429328.445914321.3018.5306016.40MT7-96Y690.801430185.725914215.9518.6306516.80MT7-02Y322-4758/11/2022None706.761429282.755915000.4218.6303911.00MT7-07Y199.161429321.075914407.3818.7303717.70MT7-09Y515.471428998.085914231.9618.6304116.80MT7-98N915.041429638.415915234.4418.73083N/AChallenging FP jobMT7-99Y705.871429491.225915035.0319.0304617.60MT7-08N940.971428849.935915005.4918.53025N/AChallenging FP OperationMT7-97N782.281429708.985915084.3018.6305716.10MT7-11N696.271428826.51 5914169.83 16.0 3032 N/AChallenging FP job, Current WellMT7-06A 17.5Challenging FPMT7-95wpMT7-92wpMT7-10wpAll wells highlighed in blue are within a quater mile1320Last Update3/28/2023SURFACE CASING SHOE SEPARATION FROM MT7-03* Lateral distance in feet, between surface casing shoes, in the X-Y planeNote that this sheet is not the definitive record for annular disposal volumesUS State Plane 1983 INFORMATION REGARDING: MT7-08 MT7-08 13-3/8" Surface Casing Well:MT7-08 13-3/8" 68# L-80 H563 Date:12/5/2022 Rig:Doyon 25 Depth Jt Number Joints Well Equipment Description and Comments Length Tops Page 1 RKB to Top Of String or RKB to Lock Down Screws Doyon RKB to Top of Landing Ring 38.11 FMC 13-3/8" Casing Hanger 1.30 38.11 13-3/8" 68# L-80 Casing Pup jt. H563 Pin X H563 Pin (39.41' HOP)2.26 39.41 Jts 4 to 81 78 Jts 13-3/8" 68# L-80 Surface Casing H563 3284.29 41.67 Jts 3 to 3 1 Jts 13-3/8" 68# L-80 Surface Casing H563 Bakerlok to FC 42.61 3325.96 13-3/8" HES H563 Float Collar 2.28 3368.57 Jts 1 to 2 2 Jts 13-3/8" 68# L-80 Surface Casing H563 85.53 3370.85 13-3/8"HES H563 Composite Float Shoe 2.19 3456.38 3458.57 3458.57 3458.57 Shoe at 3458.57' MD, 3025' TVD, 57.29° Inc 3458.57 TD at 3,469' MD, 3030' TVD, 58° Inc 3458.57 3458.57 3458.57 3458.57 3458.57 3458.57 3458.57 3458.57 3458.57 Pup joint : 14.85', 10.18', 4.68'3458.57 3458.57 Spare joints: A: 42.92' B: 43.06' C: 42.26'3458.57 3458.57 Ran total 81 jnts.3458.57 Landed casing on manual hanger 3458.57 Total 47 Centek SII centralizers 13-3/8" X 16" and 6 stop rings 3458.57 1 centralizer ran on joint #1, 10ft above shoe 3458.57 1 centralizer ran on joint #2, 30ft above pin 3458.57 1 centralizer ran on joint #3, 20ft above float collar 3458.57 Ran centralizers 1 per joint to joint #13 followed by 1 every other joint to 3458.57 surface hanger 3458.57 3458.57 3458.57 Remarks: MU Tq with Volant - Bakerlocked to pin of joint #4 Up Wt 216 K Dn Wt 197 K H563 torqued to 26k ft/lbs with BOL 2000 Arctic Grade Block Wt 43 K Rig Supervisors: Jonathan Benedict / Mike Tucker Well Name: Rig: Date:Drilling Supervisor:Pump used:3Strokesarrels234Casing TestPressure Integrity TestHole Size:412.25RKB-CHF:36.5Ft3459.0Ft-MD3025.0Ft-TVD3489.0Ft-MD3055.0Ft-TVDStrkspsiMinpsiStrkspsiMinpsi12.42 20003680 2 1530.00117721801367542640.251145Mud Weight: 11.0ppgMud Weight:11.05ppg43602367563751.001104Mud 10 min Gel: 25.0Lb/100 Ft2Mud 10 min Gel:23.0Lb/100 Ft264703367085002.001065Test Pressure: 3500.0psi Rotating Weight:96000.0Lbs858043670 10 6153.001025Rotating Weight: 43000.0LbsBlocks/Top Drive Weight:43000.0Lbs1071053670127354.00990Blocks/Top Drive Weight:43000.0LbsDesired PIT EMW:18.5ppg1284063665148455.00962Estimates for Test:6.6bblsEstimates for Test:1172psi 2.1 bbls1496073665169456.009371116 108083665 18 10377.00915EMW = Leak-off Pressure + Mud Weight =181190936652011358.00895 0.052 x TVD0.052 x30252013001036602111779.0087018.5ppg22 142015365510.0085724 154020365511.0084126166025365512.0082628178030365513.0081230190014.0079932202015.007903421403622603823904025104226304427604629004830205031505232705434005635205836806.9Bbls6.8Bbls2.5Bbls1.7BblsComments:Casing test performed after BOP test. CONOCOPHILLIPS Alaska, Inc.Pumping downEMW at 3459 Ft-MD (3025 Ft-TVD) =114511.051177+PIT 15 SecondShut-in Pressure, psiVolume PumpedVolume Bled BackVolume InputPRESSURE INTEGRITY TESTType of Test:Casing TestPressure IntegrityTestHole DepthCasing Shoe DepthCasing Size and Description:Pump Rate: 12/7/2022J. Benedict / M. TuckerVolume/Stroke6.00Pumping0.1183MT7-08 Doyon 25Volume Bled BackShut-in Pumping Shut-inVolume Pumped05001000150020002500300035004000012345678PRESSURECASING TESTLEAK-OFF TESTPIT PointBarrels0 5 10 15 20 25 30Shut-In time, MinutesLost 25 psi during test, held 99.3% of test pressure.MT7-08 Surface Casing and FIT 12-07-22.xlsxSummary MT7-08 Intermediate Casing Well:MT7-08 9-5/8", 47#, T95 & 43.5#, L80, H563 Int Csg Date:12/14/2022 Rig:Doyon 25 Depth Jt Number Joints Well Equipment Description and Comments Length Tops Page 1 RKB to Top Of String or RKB to Lock Down Screws RKB to LLDS 36.50 FMC 9-5/8" Casing Hanger 1.38 36.50 9-5/8" 43.5# L-80 Casing Pup jt. H563 Pin x Pin 3.70 37.88 Jts 119 to 256 138 Jts 9-5/8" 43.5# L80 H563 Casing Joint 5960.68 41.58 9-5/8" 47# T95 H563 Casing PUP Joint 9.67 6002.26 Jts 4 to 118 115 Jts 9-5/8" 47# T95 H563 Casing Joint 4896.98 6011.93 Jts 3 to 3 1 Jts 9-5/8" 47# T95 H563 Casing Joint - BakerLok'd to FC 41.93 10908.91 9-5/8" Davis Lynch Float Collar, H563 2.79 10950.84 Jts 1 to 2 2 Jts 9-5/8" 47# T95 H563 Casing Joint 85.07 10953.63 9-5/8" Davis Lynch Float Shoe, H563. Aluminium nose 3.09 11038.70 11041.79 Spare 43.5#, A: 43.58', B: 43.14', C: 43.52', D: 43.58', E: 43.50'11041.79 Spare 47#, F: 43.57', G: 42.35', H: 43.66', I: 43.42', 11041.79 Pups 47# 4.67', 9.67', 14.67', 19.67'11041.79 11041.79 11041.79 11041.79 11041.79 11041.79 11041.79 Centralizers 11041.79 9.625 x 12 Volant 1 per 3 jts in surface casing = 1 11041.79 9.625 x 12 Centeks 1 per 3 jts in surface casing = 26 11041.79 9.625 x 12 Centeks 1 per joint across cemented interval = 98 11041.79 Bakerlock to Pin of Joint #4 11041.79 11041.79 Calculated TOC: ~6856'11041.79 11041.79 11041.79 11041.79 11041.79 Shoe @ 11,042' MD, 7,368' TVD 11041.79 TD @ 11,057' MD, 7,377' TVD 11041.79 11041.79 11041.79 Remarks: 9-5/8" 47#, T95, H563, 15.8k Ft/lbs with Best-O-Life 2000 AG Up Wt ??? K 9-5/8" 43.5# L80 H563, 14.3k Ft/lbs with Best-O-Life 2000 AG Dn Wt 160 K Block Wt 43 K Rig Supervisors: J. Benedict / L. Shirley Well Name: Rig: Date:Drilling Supervisor:Pump used:3Strokesarrels234Casing TestPressure Integrity TestHole Size:88.5RKB-CHF:36.5Ft11042.0Ft-MD7368.0Ft-TVD11077.0Ft-MDFt-TVDStrkspsiMinpsiStrkspsiMinpsi12.42 2003700.009754161200.25950Mud Weight: 11.5ppgMud Weight:11.45ppg8291601.00945Mud 10 min Gel: 25.0Lb/100 Ft2Mud 10 min Gel:23.0Lb/100 Ft2123122002.00935Test Pressure: 3500.0psi Rotating Weight:96000.0Lbs16415 2453.00930Rotating Weight: 43000.0LbsBlocks/Top Drive Weight:43000.0Lbs205182904.00920Blocks/Top Drive Weight:43000.0LbsDesired PIT EMW:14.0ppg246213405.00915Estimates for Test:20.7bblsEstimates for Test:977psi 5.7 bbls287243856.009051132827 4307.00895EMW = Leak-off Pressure + Mud Weight =369304808.00890 0.052 x TVD0.052 x73684010335309.0088514.0ppg441536 57510.00880482039 62511.0052254267512.0056304572513.00604877014.00645181515.006854860725790576609508061975848892968.1BblsBbls5.2Bbls3.0BblsComments:Volume Bled BackShut-in Pumping Shut-inVolume PumpedPRESSURE INTEGRITY TESTType of Test:Casing TestPressure IntegrityTestHole DepthCasing Shoe DepthCasing Size and Description:Pump Rate: 12/16/2022J. Benedict / L. ShirleyVolume/Stroke6.00Pumping0.0846MT7-08 Doyon 25MP2 Pumping both waysCONOCOPHILLIPS Alaska, Inc.Pumping downEMW at 11042 Ft-MD (7368 Ft-TVD) =95011.45975+PIT 15 SecondShut-in Pressure, psiVolume PumpedVolume Bled BackVolume Input0500100015000123456789PRESSURECASING TESTLEAK-OFF TESTPIT PointBarrels0 5 10 15 20 25 30Shut-In time, MinutesMT7-08 9.625in FIT 12-15-22.xlsxSummary Page 15/52 MT7-08 Report Printed: 3/30/2023 Operations Summary (Detailed) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 12/13/2022 10:00 12/13/2022 10:30 0.50 INTRM1, TRIPCAS OWFF Flow check. Static. PJSM f/ BHA. SimOps: Pull PS21 slips and install master bushings. 11,057.0 11,057.0 0.00 12/13/2022 10:30 12/13/2022 13:00 2.50 INTRM1, TRIPCAS BHAH Rack back HWDP. LD BHA. 11,057.0 11,057.0 0.00 12/13/2022 13:00 12/13/2022 14:30 1.50 INTRM1, CASING WWWH Retrieve wear ring and MU jetting tool. Jet WH and BOP. 11,057.0 11,057.0 0.00 12/13/2022 14:30 12/13/2022 15:30 1.00 INTRM1, CASING BOPE Drain stack. Swap out UPR to 9.625" casing rams. RU to test casing rams. 11,057.0 11,057.0 0.00 12/13/2022 15:30 12/13/2022 17:30 2.00 INTRM1, CASING BOPE Test annular 250/2500PSI f/ 5/10 m in each. Test 9 5/8" casing rams 250/4000PSI f/ 5/10 min ea. Good test. RD test equipment. 11,057.0 11,057.0 0.00 12/13/2022 17:30 12/13/2022 19:30 2.00 INTRM1, CASING RURD RU csg running equipment. Perorm dummy run w/ landing joint and hanger. LD landing joint and hanger. 11,057.0 11,057.0 0.00 12/13/2022 19:30 12/13/2022 20:00 0.50 INTRM1, CASING PUTB PJSM. PU shoetrack and RIH. Threadlock each connection. Pump through shoetrack and check floats. Good. 11,057.0 11,057.0 0.00 12/13/2022 20:00 12/14/2022 00:00 4.00 INTRM1, CASING PUTB RIH w/ 9 5/8" 47# T95 H563 casing f/ 170' to 2078' as per tally. Using fillup line and topping off every 10 jts. MU Torques: 9 5/8" 47# T95 H563: 15.8k ft/lbs 9 5/8" 43.5# L80 H563: 14.3k ft/lbs 11,057.0 11,057.0 0.00 12/14/2022 00:00 12/14/2022 02:00 2.00 INTRM1, CASING PUTB RIH w/ 9 5/8" 47# T95 H563 casing f/ 2078' to 3450' as per tally. Using fillup line and topping off every 10 jts. MU Torques: 9 5/8" 47# T95 H563: 15.8k ft/lbs 9 5/8" 43.5# L80 H563: 14.3k ft/lbs 11,057.0 11,057.0 0.00 12/14/2022 02:00 12/14/2022 03:00 1.00 INTRM1, CASING CIRC Circulate BU @ 3450'. Stage rate up to 6 BPM. Reciprocate pipe f/ 3400' to 3445'. 150 PSI - 2BPM 160 PSI - 3 BPM 170 PSI - 4 BPM 180 PSI - 5 BPM 190 PSI - 6 BPM 160k PU 155k SO 154k ROT TQ: 7k 10 RPM 7k 20 RPM 11,057.0 11,057.0 0.00 12/14/2022 03:00 12/14/2022 08:30 5.50 INTRM1, CASING PUTB RIH w/ 9 5/8" 47# T95 H563 casing f/ 3450' to 6372' as per tally. Using fillup line and topping off every 10 jts. MU Torques: 9 5/8" 47# T95 H563: 15.8k ft/lbs 9 5/8" 43.5# L80 H563: 14.3k ft/lbs 11,057.0 11,057.0 0.00 Rig: DOYON 25 Page 16/52 MT7-08 Report Printed: 3/30/2023 Operations Summary (Detailed) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 12/14/2022 08:30 12/14/2022 09:30 1.00 INTRM1, CASING CIRC Circulate BU @ 6372'. Stage rate up to 6 BPM. 300 PSI - 3 BPM 325 PSI - 4 BPM 350 PSI - 5 BPM 380 PSI - 6 BPM 253 FCP @ 6 BPM 237k PU 199k SO 11,057.0 11,057.0 0.00 12/14/2022 09:30 12/14/2022 14:00 4.50 INTRM1, CASING PUTB RIH w/ 9 5/8" 47# T95 H563 casing f/ 6372' to 9440' as per tally. Using fillup line and topping off every 10 jts. MU Torques: 9 5/8" 47# T95 H563: 15.8k ft/lbs 9 5/8" 43.5# L80 H563: 14.3k ft/lbs 11,057.0 11,057.0 0.00 12/14/2022 14:00 12/14/2022 15:30 1.50 INTRM1, CASING CIRC Circulate BU @ 9440'. Stage rate up to 8 BPM. 8 BPM 473 PSI 347k PU 222k SO 11,057.0 11,057.0 0.00 12/14/2022 15:30 12/14/2022 18:30 3.00 INTRM1, CASING PUTB RIH w/ 9 5/8" 47# T95 H563 casing f/ 9440' to 11041' as per tally. Land out hanger. FS @ 11041' MD Using fillup line and topping off every 10 jts. MU Torques: 9 5/8" 47# T95 H563: 15.8k ft/lbs 9 5/8" 43.5# L80 H563: 14.3k ft/lbs 11,057.0 11,057.0 0.00 12/14/2022 18:30 12/14/2022 21:00 2.50 INTRM1, CEMENT CIRC Circulate and condition mud f/ cement job. Stage up rate to *BPM w/ no losses. PJSM f/ cement job. 8 BPM 333 PSI. 11,057.0 11,057.0 0.00 12/14/2022 21:00 12/15/2022 00:00 3.00 INTRM1, CEMENT CMNT Line up cement unit. flush w/ 3 bbls FW. Test lines to 3650psi. Good test. Mix and pump 60bbls 12.5ppg mud push II at 4 bpm. SD and drop bottom plug. Mix and pump 161bbls 13 ppg G lead cement at 4 bpm, Mix and pump 152bbls 15.8 ppg G Tail cement at 4.5 bpm. SD and drop top plug. Pump 20 bbls FW w/ cement unit. Swap over to rig pumps and begin displace cement at 6bpm. 11,057.0 11,057.0 0.00 12/15/2022 00:00 12/15/2022 02:30 2.50 INTRM1, CEMENT DISP Continue displace cement at 6bpm 200psi 770bbls slow rate to 3bpm 939psi. Plug bumped @ 6747 stks (calculated stks6758). Pressure up to 1500psi. Check floats. Good. Cement in place @ 02:21hrs 12/15/22. 11,057.0 11,057.0 0.00 12/15/2022 02:30 12/15/2022 04:00 1.50 INTRM1, CEMENT PRTS Line up and test casing to 3500PSI for 30 minutes. Good test. 11.5bbls pumped. 10.4 bbls returned. 11,057.0 11,057.0 0.00 12/15/2022 04:00 12/15/2022 05:30 1.50 INTRM1, WHDBOP RURD LD landing joint and RD casing equipment. 11,057.0 11,057.0 0.00 Rig: DOYON 25 INFORMATION REGARDING: MT7-97 MT7-97 13-3/8" Surface Casing Well:MT7-97 13-3/8" 68# H563 Date:1/29/2023 Rig:Doyon 25 Depth Jt Number Joints Well Equipment Description and Comments Length Tops Page 1 RKB to Top Of String or RKB to Lock Down Screws Doyon RKB to Top of Landing Ring 39.70 FMC 13-3/8" Casing Hanger 1.30 39.70 13-3/8" 68# L-80 Casing Pup jt. H563 Pin X H563 Pin 2.14 41.00 Jts 74 to 74 1 Jts 13-3/8" 68# L-80 Surface Casing H563 43.09 43.14 13-3/8" 68# L-80 Surface Casing H563 PUP Jnt 9.86 86.23 Jts 4 to 73 70 Jts 13-3/8" 68# L-80 Surface Casing H563 2960.17 96.09 Jts 3 to 3 1 Jts 13-3/8" 68# L-80 Surface Casing H563 Bakerlok to FC 43.08 3056.26 13-3/8" HES H563 Float Collar 2.33 3099.34 Jts 1 to 2 2 Jts 13-3/8" 68# L-80 Surface Casing H563 85.71 3101.67 13-3/8"HES H563 Composite Float Shoe 2.25 3187.38 3189.63 3189.63 Total 74 jnts in pipe shed.3189.63 Total 3 Shoe track joints 3189.63 5 jnts on rack outside. (5 of them marked for spares)3189.63 Total on location 79joint (includes 3jnt shoe track + 5 spares)3189.63 Total 43 Centek SII centralizers 13-3/8" X 16"3189.63 3189.63 3189.63 Pup joint : 4.67' , 9.86', 15.27'3189.63 3189.63 Spare joints: 3189.63 A= 42.28 Used. Swapped for jnt 51 both jots identical length. 3189.63 B= 42.41 3189.63 C= 42.62 3189.63 D= 42.70 3189.63 E= 42.39 3189.63 3189.63 3189.63 3189.63 3189.63 3189.63 3189.63 3189.63 3189.63 Remarks: MU Tq with Volant - Bakerlocked to pin of joint #4 Up Wt K Dn Wt K H563 torqued to 25k ft/lbs with BOL 2000 Arctic Grade Block Wt 43K Rig Supervisors: J. Benedict / P. Angelle Well Name: Rig: Date:Drilling Supervisor:Pump used:2Strokesarrels434Casing TestPressure Integrity TestHole Size:10RKB-CHF:40.1Ft3189.6Ft-MD3057.2Ft-TVD3221.0Ft-MD3088.6Ft-TVDStrkspsiMinpsiStrkspsiMinpsi12.42 256003575 2 1800.00122410991357543150.251215Mud Weight: 11.0ppgMud Weight:10.9ppg151252357564551.001191Mud 10 min Gel: 25.0Lb/100 Ft2Mud 10 min Gel:25.0Lb/100 Ft2201583357586002.001160Test Pressure: 3500.0psi Rotating Weight:96000.0Lbs25 26043575 10 7403.001140Rotating Weight: 96000.0LbsBlocks/Top Drive Weight:43000.0Lbs3032253575128754.001122Blocks/Top Drive Weight:43000.0LbsDesired PIT EMW:18.5ppg3549063560149905.001108Estimates for Test:5.8bblsEstimates for Test:1208psi 2 bbls40710735601611106.0010921145 95083560 18 12247.001076EMW = Leak-off Pressure + Mud Weight =501225935608.001055 0.052 x TVD0.052 x30575514501035609.00104818.6ppg60 169015355010.00104065 18302035407020652535307523003035308025008527759030009532501003490104357512.3Bbls7.0Bbls2.1Bbls2.1BblsComments:Csg test performed after cmt job.CMT hose was not flooded. Compressed ~4bbl air. FIT performed pumping down both ways. CONOCOPHILLIPS Alaska, Inc.Pumping downEMW at 3189.63 Ft-MD (3057.2 Ft-TVD) =121510.91224+PIT 15 SecondShut-in Pressure, psiVolume PumpedVolume Bled BackVolume InputPRESSURE INTEGRITY TESTType of Test:Casing TestPressure IntegrityTestHole DepthCasing Shoe DepthCasing Size and Description:Pump Rate: 2/2/2023J. Benedict / P. Angelle / L. ShirleyVolume/Stroke0.50Pumping0.1182MT7-97 Doyon 25Volume Bled BackShut-in Pumping Shut-inVolume Pumped0500100015002000250030003500400002468101214PRESSURECASING TESTLEAK-OFF TESTPIT PointBarrels0 5 10 15 20 25 30Shut-In time, MinutesLost 45 psi during test, held 98.7% of test pressure.MT7-97 Surface casing PIT 02_02_23.xlsxSummary Page 6/35 MT7-97 Report Printed: 3/30/2023 Operations Summary (Detailed) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 1/28/2023 20:15 1/28/2023 22:00 1.75 SURFAC, TRIPCAS BKRM Attempt to pull, Mud moving with pipe. Continue BROOH from 608' MD to 242' MD. Encountered 40bbls mud loss down hole at 480' MD, Pumped 30bbls 5#/bbls NP,SAP and Soap, Extingushed losses. Increase of cutting out hole. Continue BROOH to DC. Cuttings minimum at shakers at 242' MD. GPM: 900/700 PSI: 2530/1180 RPM: 40 TQ: 3.5k ft/lbs 2,198.0 3,201.0 1,003.00 1/28/2023 22:00 1/29/2023 00:00 2.00 SURFAC, TRIPCAS BHAH OWFF (static) L/D surface BHA #1, All BHA componets were clean. 2,198.0 3,201.0 1,003.00 1/29/2023 00:00 1/29/2023 01:00 1.00 SURFAC, CASING CLEN Clean and clear rig floor. 3,201.0 3,201.0 0.00 1/29/2023 01:00 1/29/2023 02:30 1.50 SURFAC, CASING RURD R/U 13-3/8" casing running equipment. PJSM-running surface casing. 3,201.0 3,201.0 0.00 1/29/2023 02:30 1/29/2023 06:00 3.50 SURFAC, CASING PUTB Make up 13-5/8" 68ppf L-80 H563 shoe track, Baker-loc to joint #4 and circulate shoe track. (all ok) Increased MU torque to 30k. Continue RIH to 980' MD. 3,201.0 3,201.0 0.00 1/29/2023 06:00 1/29/2023 12:00 6.00 SURFAC, CASING PUTB Continue run 13-3/8" 68ppf L-80 H563 casing from 980' MD to 2,580' MD SO: 167k 3,201.0 3,201.0 0.00 1/29/2023 12:00 1/29/2023 13:45 1.75 SURFAC, CASING PUTB Continue run 13-3/8" 68ppf L-80 H563 casing from 2,580' MD to 3,131' MD SO: 185k 3,201.0 3,201.0 0.00 1/29/2023 13:45 1/30/2023 00:00 10.25 SURFAC, CASING OTHR Stage pumps up from 1bpm to 6bpm 94psi/140psi, Wash and rotate casing down from 3,131' MD to 3,190' MD. Pumped 2 - 40bbl sweeps (3p/bbls NP, SAP and Soap) PU: 275k SO: 187k ROT: 212k GPM: 248/294 PSI: 140/156 ROT: 15 TQ: 12/15k ft/lbs 3,201.0 3,201.0 0.00 1/30/2023 00:00 1/30/2023 01:00 1.00 SURFAC, CASING OTHR Wash and rotate casing down from 3,190' MD to 3,194' MD. PU: 275k SO: 187k ROT: 212k GPM: 248/294 PSI: 140/156 ROT: 15 TQ: 12/15k ft/lbs 3,201.0 3,201.0 0.00 1/30/2023 01:00 1/30/2023 02:30 1.50 SURFAC, CASING PULD POOH and L/D 2- joints 13-3/8" casing, M/U FMC hanger. Break circulation at 3bpm 102psi and land hanger with 188k. 3,201.0 3,201.0 0.00 Rig: DOYON 25 Page 7/35 MT7-97 Report Printed: 3/30/2023 Operations Summary (Detailed) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 1/30/2023 02:30 1/30/2023 03:30 1.00 SURFAC, CEMENT CIRC Stage pumps up to 7 BPM. Circulate and condition mud. Reciprocating casing 5/10' 7bpm PSI 213k PU 185k SO 3,201.0 3,201.0 0.00 1/30/2023 03:30 1/30/2023 04:00 0.50 SURFAC, CEMENT PRTS R/U cement lines, Break circulation and test lines to 4500psi. 3,201.0 3,201.0 0.00 1/30/2023 04:00 1/30/2023 07:30 3.50 SURFAC, CEMENT CMNT Mix and pump 100 bbls of 11.0 ppg Mud Push II @ 4.5 bbls/min, 400 psi, Dropped bottom plug, Add two gallions dye. Start batching lead. Pump 361.5 bbls of 11.0 ppg DeepCRETE cement at 5.3 bbls/min, 470 psi ICP. Batch and pump 72 bbls of G Blend Tail 15.8 ppg cement @ 4.0 bbls/min, 312 psi. Drop top plug & kick out with 20 bbls of fresh H2O. Swap to rig & displace @ 8 bbls/min, 222 psi ICP, 563 psi FCP. Slow pumps 20 bbls prior to calculated bump to 3 bbls/min, 353 psi ICP, Bump plug with 914 psi (444 bbls + 20 bbls). 3751 strokes, final circ. PSI 353 Pressure up to 915 psi & hold for 5 minutes. Bleed off pressure, Check floats good. 120 bbls cement to surface. Cement in place @ 07:17hrs 1/30/23 3,201.0 3,201.0 0.00 1/30/2023 07:30 1/30/2023 09:00 1.50 SURFAC, CEMENT PRTS Drain and flush stack with black water, Pressure test casing to 3575psi 30min. pressure 3530psi. pumped 12.3bbls returned 7.0bbls Final pressure 3130psi 3,201.0 3,201.0 0.00 1/30/2023 09:00 1/30/2023 10:30 1.50 SURFAC, CEMENT RURD Remove landing joint and R/D casing equipment. Clear rig floor. 3,201.0 3,201.0 0.00 1/30/2023 10:30 1/30/2023 11:00 0.50 SURFAC, CEMENT CLEN Remove master bushings and clean flow box and jet flow line. Blow down surface equipment. 3,201.0 3,201.0 0.00 1/30/2023 11:00 1/30/2023 14:00 3.00 SURFAC, WHDBOP NUND Flush riser and cap 4" conductor lines, N/D surface riser. 3,201.0 3,201.0 0.00 1/30/2023 14:00 1/30/2023 16:30 2.50 SURFAC, WHDBOP NUND NU and orientate WH. Test seals to 1000psi (CPAI witnessed) 3,201.0 3,201.0 0.00 1/30/2023 16:30 1/30/2023 22:00 5.50 SURFAC, WHDBOP NUND Nipple up drilling riser & BOPE SIMOPS- Clean pits, slide Joe's box, install flow line, choke & kill lines, N/U MPD equipment NOTE: Rig contract 15hrs to N/U and test BOPs Time started at 1630hrs 1- 30-23 3,201.0 3,201.0 0.00 1/30/2023 22:00 1/31/2023 00:00 2.00 SURFAC, WHDBOP PRTS Set test plug and install MPD test cap. Attempt to test to 250/1250psi, pressure bleeding off. Trouble shoot same. 3,201.0 3,201.0 0.00 1/31/2023 00:00 1/31/2023 02:00 2.00 SURFAC, WHDBOP PRTS Tighted Annular cap, Attempt to retest to 250/1250psi, Slight leak. 3,201.0 3,201.0 0.00 1/31/2023 02:00 1/31/2023 03:00 1.00 SURFAC, WHDBOP RURD Pull MPD test cap and install trip nipple 3,201.0 3,201.0 0.00 1/31/2023 03:00 1/31/2023 04:00 1.00 SURFAC, WHDBOP BOPE Install 9-5/8" test joint, Attempt to test annular to 3500psi, Annular cap leaking. Continue trouble shooting leak. Leak on Oteco connection on kill line. 3,201.0 3,201.0 0.00 Rig: DOYON 25 MT7-97 Intermediate Casing Well:MT7-97 9-5/8", 47#, T95 & 43.5#, L80, H563 Int Csg Date:2/7/2023 Rig:Doyon 25 Depth Jt Number Joints Well Equipment Description and Comments Length Tops Page 1 RKB to Top Of String or RKB to Lock Down Screws RKB to LLDS 37.25 FMC 9-5/8" Casing Hanger 1.38 37.25 9-5/8" 43.5# L-80 Casing Pup jt. H563 Pin x Pin 3.02 38.63 Jts 118 to 190 73 Jts 9-5/8" 43.5# L80 H563 Casing Joint 3159.06 41.65 9-5/8" 47# T95 H563 Casing Pup Joint 14.67 3200.71 9-5/8" 47# T95 H563 Casing Pup Joint 4.68 3215.38 Jts 4 to 117 114 Jts 9-5/8" 47# T95 H563 Casing Joint 4876.13 3220.06 Jts 3 to 3 1 Jts 9-5/8" 47# T95 H563 Casing Joint Bakerlok to FC 43.46 8096.19 9-5/8" Davis Lynch Float Collar, H563 2.79 8139.65 Jts 1 to 2 2 Jts 9-5/8" 47# T95 H563 Casing Joint 87.05 8142.44 9-5/8" Davis Lynch Float Shoe, H563 3.06 8229.49 8232.55 Spare 43.5#, A 43.51, B 43.43, C 43.63, D 43.65, E 43.37'8232.55 Spare 47#, F 43.45, G 42.44, H 42.74, I 43.47, J 41.62 8232.55 Pups 47# 4.68', 9.65', 14.67', 8232.55 8232.55 8232.55 8232.55 8232.55 8232.55 Centralizers 8232.55 9.625 x 12 Hydroform 1 per 3 jts in surface casing = 24 8232.55 9.625 x 12 Hydroform 1 per joint across cemented interval = 65 8232.55 Bakerlock to Pin of Joint #4 8232.55 8232.55 8232.55 8232.55 8232.55 8232.55 8232.55 8232.55 Shoe @ 8232.55' MD, 7,527.55' TVD 8232.55 TD @ 8242' MD, 7,536.26' TVD 8232.55 Estimated TOC 5,309'8232.55 8232.55 Remarks: 9-5/8" 47#, T95, H563, 15.8k Ft/lbs with Best-O-Life 2000 AG Up Wt 325 K 9-5/8" 43.5# L80 H563, 14.3k Ft/lbs with Best-O-Life 2000 AG Dn Wt 243 K Block Wt 43 K Rig Supervisors: R. Reinhardt / L. Shirley We Well Name: Rig: Date:Drilling Supervisor:Pump used:3Strokesarrels234Casing TestPressure Integrity TestHole Size:88.5RKB-CHF:36.5Ft8232.6Ft-MD7527.6Ft-TVD8264.0Ft-MD7543.0Ft-TVDStrkspsiMinpsiStrkspsiMinpsi8.835 503003600 0 00.0099041151360041800.25990Mud Weight: 11.8ppgMud Weight:11.50ppg82552360083201.00990Mud 10 min Gel: 25.0Lb/100 Ft2Mud 10 min Gel:23.0Lb/100 Ft21238533590124602.00990Test Pressure: 3500.0psi Rotating Weight:96000.0Lbs16 54043590 16 6103.00990Rotating Weight: 43000.0LbsBlocks/Top Drive Weight:43000.0Lbs2068053590207404.00985Blocks/Top Drive Weight:43000.0LbsDesired PIT EMW:14.0ppg2482563590248905.00985Estimates for Test:7.8bblsEstimates for Test:979psi 2.1 bbls2896573585289906.009801132 1115835857.00970EMW = Leak-off Pressure + Mud Weight =361240935808.00950 0.052 x TVD0.052 x75284013851035809.0094014.0ppg44 148515356010.0094048 162520356011.0094052176025356056190030356060207564220068235072250076265080280084297588312592329096345010036008.4Bbls8.4Bbls2.4Bbls2.4BblsComments:CONOCOPHILLIPS Alaska, Inc.Pumping downEMW at 8232.55 Ft-MD (7527.55 Ft-TVD) =99011.5990+PIT 15 SecondShut-in Pressure, psiVolume PumpedVolume Bled BackVolume InputPRESSURE INTEGRITY TESTType of Test:Casing TestPressure IntegrityTestHole DepthCasing Shoe DepthCasing Size and Description:Pump Rate: 2/7/2023R. Reinhardt / L. ShirleyVolume/Stroke6.00Pumping0.0846MT7-97 Doyon 25Volume Bled BackShut-in Pumping Shut-inVolume Pumped050010001500200025003000350040000123456789PRESSURECASING TESTLEAK-OFF TESTPIT PointBarrels0 5 10 15 20 25 30Shut-In time, MinutesLost 40 psi during test, held 98.9% of test pressure.MT7-97 9.625in Csg-FIT 2-7-23.xlsxSummary Well Name: Rig: Date:Drilling Supervisor:Pump used:2Barrelsarrels452Casing TestPressure Integrity TestHole Size:511RKB-CHF:37.3Ft3247.0Ft-MD3039.0Ft-TVD5309.0Ft-MD4962.0Ft-TVDBblspsiMinpsiBblspsiMinpsi12.42 2 0000.0036810.25600.25325Enter outer casing shoe test results in commentsMud Weight:11.9ppg20.51200.50310Casing description references outer casing string.Inner casing OD:9.6In.30.751901.00309Hole Size is that drilled below outer casing.412751.50307Use estimated TOC for Hole Depth.51.254262.00305Enter inner casing OD at right. Desired PIT EMW:18.6ppg61.56652.50296Estimates for Test:1059psi 0.9 bbls71.755513.0028811 824863.50284EMW = Leak-off Pressure + Mud Weight =92.254224.00280 0.052 x TVD0.052 x3039102.54074.5028016.1152.75 3975.002782033825.50280253.254026.00276303.54076.502743.754017.0027643977.502684.254008.002664.54068.502629.002619.5026410.002640.0BblsBbls4.5BblsBblsComments:Volume Bled BackShut-in Pumping Shut-inVolume PumpedPRESSURE INTEGRITY TESTType of Test:Changes for Annular Adequacy TestPressure IntegrityTestHole DepthCasing Shoe DepthCasing Size and Description:Pump Rate: 2/8/2023R. Reinhardt/ L. Shirley0.50Pumping0.0161MT7-97 Doyon 25Performed with diesel, 08:00 hrs 2/8/23, followed by 286 bbl water flush and 10 bbl diesel to freeze protect surface linesMud column was 11.9 ppg FWPCONOCOPHILLIPS Alaska, Inc.Pumping downEMW at 3247 Ft-MD (3039 Ft-TVD) =32511.9665+PIT 15 SecondShut-in Pressure, psiVolume PumpedVolume Bled BackVolume Input05001000012345PRESSURECASING TESTLEAK-OFF TESTPIT PointBarrels0 5 10 15 20 25 30Shut-In time, MinutesMT7-97 AD LOT #1 2-8-23.xlsmSummary Page 14/35 MT7-97 Report Printed: 3/30/2023 Operations Summary (Detailed) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 2/5/2023 00:00 2/5/2023 06:00 6.00 INTRM1, TRIPCAS BKRM BROOH f/ 5663' to 4491' 1018 GPM 2920 PSI 120 RPM 12k TQ 12.6ppg ECD Note: Observed pressure spike @ 4918' and shakers loaded up right after. Slowed pulling speed and circulated BU while BROOH. Shakers were better but still had large plate sized cuttings coming across. Pumped 1 50bbl low vis sweep. 7,720.0 8,244.0 524.00 2/5/2023 06:00 2/5/2023 14:00 8.00 INTRM1, TRIPCAS BKRM BROOH f/ 4491' to 3190'. No overpull observed pulling into shoe. 1018 GPM 2560 PSI 120 RPM 7k TQ 12.6ppg ECD Note: Pumped 2 50bbl low vis sweeps. 7,720.0 8,244.0 524.00 2/5/2023 14:00 2/5/2023 16:30 2.50 INTRM1, TRIPCAS CIRC Circulate and clean hole. Pumped low/hi vis sweeps. 100 RPM 7k TQ 1013 GPM 2540 PSI 7,720.0 8,244.0 524.00 2/5/2023 16:30 2/5/2023 17:00 0.50 INTRM1, TRIPCAS OWFF Flow check. Slight drop observed. 7,720.0 8,244.0 524.00 2/5/2023 17:00 2/5/2023 19:00 2.00 INTRM1, TRIPCAS TRIP POOH to BHA @ 650' 7,720.0 8,244.0 524.00 2/5/2023 19:00 2/5/2023 19:30 0.50 INTRM1, TRIPCAS OWFF Flow check. Slight drop observed. PJSM f/ BHA. 7,720.0 8,244.0 524.00 2/5/2023 19:30 2/5/2023 22:00 2.50 INTRM1, TRIPCAS BHAH Rack back HWDP and LD BHA. 7,720.0 8,244.0 524.00 2/5/2023 22:00 2/5/2023 22:30 0.50 INTRM1, CASING WWWH Retrieve wear bushing. 7,720.0 8,244.0 524.00 2/5/2023 22:30 2/5/2023 23:30 1.00 INTRM1, CASING WWWH MU jetting tool and wash stack/wellhead. 7,720.0 8,244.0 524.00 2/5/2023 23:30 2/6/2023 00:00 0.50 INTRM1, CASING BOPE Change UPR to 9 5/8 fixed rams. 7,720.0 8,244.0 524.00 2/6/2023 00:00 2/6/2023 00:30 0.50 INTRM1, CASING BOPE Install 9 5/8" fixed rams in UPR. 8,244.0 8,244.0 0.00 2/6/2023 00:30 2/6/2023 02:30 2.00 INTRM1, CASING BOPE Test annular 250/2500PSI f/ 5/10 m in each. Test 9 5/8" casing rams 250/3500PSI f/ 5/10 min ea. Good test. RD test equipment. Test witnessed by Quinn Sawyer (BLM) AOGCC witness waived per Guy Cook email 18:31hrs 2/4/23 8,244.0 8,244.0 0.00 2/6/2023 02:30 2/6/2023 04:30 2.00 INTRM1, CASING RURD RU 9 5/8" casing equipment. 8,244.0 8,244.0 0.00 2/6/2023 04:30 2/6/2023 05:00 0.50 INTRM1, CASING OTHR Perform dummy run w/ hanger and landing joint. PJSM f/ csg run. 8,244.0 8,244.0 0.00 2/6/2023 05:00 2/6/2023 05:30 0.50 INTRM1, CASING PUTB MU 9 5/8" FS/shoetrack and FC and RIH to 92'. Threadlock connections. Test floats. Good. 8,244.0 8,244.0 0.00 Rig: DOYON 25 Page 15/35 MT7-97 Report Printed: 3/30/2023 Operations Summary (Detailed) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 2/6/2023 05:30 2/6/2023 10:00 4.50 INTRM1, CASING PUTB RIH w/ 9 5/8" 47# L-80 casing f/ 178' to 3180'. Filling on the fly and topping off every 10 jts. 15.8k MU TQ 47# 8,244.0 8,244.0 0.00 2/6/2023 10:00 2/6/2023 11:00 1.00 INTRM1, CASING CIRC CBU. Stage pumps to 8 BPM 336 GPM 245 PSI 157k PU 156k SO 8,244.0 8,244.0 0.00 2/6/2023 11:00 2/6/2023 14:30 3.50 INTRM1, CASING PUTB RIH w/ 9 5/8" 47# L-80 casing f/ 3180' to 5715'. Filling on the fly and topping off every 10 jts. 15.8k MU TQ 47# 14.3k MU TQ 43.50# 8,244.0 8,244.0 0.00 2/6/2023 14:30 2/6/2023 16:00 1.50 INTRM1, CASING CIRC CBU. Stage pumps to 6 BPM 336 GPM 245 PSI 157k PU 156k SO 8,244.0 8,244.0 0.00 2/6/2023 16:00 2/6/2023 19:00 3.00 INTRM1, CASING PUTB RIH w/ 9 5/8" 47# L-80 casing f/ 5715' to 8200'. Filling on the fly and topping off every 10 jts. 15.8k MU TQ 47# 8,244.0 8,244.0 0.00 2/6/2023 19:00 2/6/2023 19:30 0.50 INTRM1, CASING PUTB PU hanger/LJ. MU and land casing. FS @ 8232.55' 8,244.0 8,244.0 0.00 2/6/2023 19:30 2/6/2023 21:30 2.00 INTRM1, CEMENT CIRC Circulate and condition mud f/ cement job. Stage rates up to 6 BPM. 8,244.0 8,244.0 0.00 2/6/2023 21:30 2/7/2023 00:00 2.50 INTRM1, CEMENT CMNT Line up cement unit. flush w/ 2 bbls FW. Test lines to 3700psi. Good test. Mix and pump 60bbls 12.5ppg mud push II at 4 bpm. SD and drop bottom plug. Mix and pump 69bbls 13.0 ppg G lead cement at 4.5bpm, Mix and pump 153bbls 15.8 ppg G Tail cement at 4.5 bpm. SD and drop top plug. Pump 20 bbls FW w/ cement unit. Swap over to rig pumps and begin displace cement at 8bpm. 8,244.0 8,244.0 0.00 2/7/2023 00:00 2/7/2023 02:00 2.00 INTRM1, CEMENT CMNT Swapped over to rig pumps. Displace cement w/ 11.8ppg OBM @ 8BPM. Slow to 6BPM f/ bottom plug. Observed bottom plug shear. Continue displacing @ 6BPM. Slow to 3 BPM with 20bbls left. Pump maximum strokes (6978). Final circulating pressure 998 PSI. Did not bump plug. Hold pressure for 5 minutes and check floats. Floats held. Cement in place @ 01:30hrs 2/7/23. 8,244.0 8,244.0 0.00 2/7/2023 02:00 2/7/2023 04:00 2.00 INTRM1, WHDBOP RURD Blow down cement line. Pump out stack.RD Csg equipment. LD landing joint. Clean and clear rig floor. 8,244.0 8,244.0 0.00 2/7/2023 04:00 2/7/2023 05:00 1.00 INTRM1, WHDBOP WWSP Install pack off and test 5000psi f/ 10 minutes. 8,244.0 8,244.0 0.00 2/7/2023 05:00 2/7/2023 09:30 4.50 INTRM1, WHDBOP BOPE CO UPR f/ 9 5/8" fixed to 4 1/2" x 7" VBR and test w/ 5" and 7" test joints 250/3500psi 5/10 min ea.Test annular w/ 7" test joint 250/2500psi 5/10 min ea. RD test equipment. 8,244.0 8,244.0 0.00 Rig: DOYON 25 INFORMATION REGARDING: MT7-11 MT7-11 13-3/8" Surface Casing Well:MT7-11 13-3/8" 68# H563 Date:3/7/2023 Rig:Doyon 25 Depth Jt Number Joints Well Equipment Description and Comments Length Tops Page 1 RKB to Top Of String or RKB to Lock Down Screws Doyon RKB to Top of Landing Ring 39.70 FMC 13-3/8" Casing Hanger 1.30 39.70 13-3/8" 68# L-80 Casing Pup jt. H563 Pin X H563 Pin 2.15 41.00 Jts 4 to 88 85 Jts 13-3/8" 68# L-80 Surface Casing H563 3577.68 43.15 Jts 3 to 3 1 Jts 13-3/8" 68# L-80 Surface Casing H563 Bakerlok to FC 37.57 3620.83 13-3/8" HES H563 Float Collar 2.30 3658.40 Jts 1 to 2 2 Jts 13-3/8" 68# L-80 Surface Casing H563 84.13 3660.70 13-3/8"HES H563 Composite Float Shoe 2.25 3744.83 3747.08 Spare joints: 3747.08 A= 42.63 3747.08 B= 41.67 3747.08 C= 42.24 3747.08 D= 41.15 3747.08 E= 41.77 3747.08 3747.08 Pup joint : 4.69' , 10.16', 14.90'3747.08 3747.08 3747.08 3747.08 3747.08 3747.08 3747.08 3747.08 3747.08 Total 88 jnts in pipe shed. (includes 3jnt shoe track)3747.08 Total 3 Shoe track joints 3747.08 5 jnts on rack outside. (5 of them marked for spares)3747.08 Total on location 93joint (includes 3jnt shoe track)3747.08 Total 45 Centek SII centralizers 13-3/8" X 16"3747.08 3747.08 3747.08 3747.08 3747.08 3747.08 Remarks: MU Tq with Volant - Bakerlocked to pin of joint #4 Up Wt 218K Dn Wt 170K H563 torqued to 25k ft/lbs with BOL 2000 Arctic Grade Block Wt 43 K Rig Supervisors: J. Benedict / P. Angelle Date:Rig:Well Name:Drilling Supervisor:Pump used:2Strokesarrels434Casing TestPressure Integrity TestHole Size:01RKB-CHF:40.1Ft3747.0Ft-MD3007.9Ft-TVD3777.0Ft-MD3007.9Ft-TVDStrkspsiMinpsiStrkspsiMinpsi212.41755025235750.00102010340135754800.25972Weight:Mud11.0ppgMud Weight:10.9ppg155402357562001.00925min Gel:Mud 1025.0Lb/100 Ft2Mud 10 min Gel:25.0Lb/100 Ft2207603357583202.00875ressure:Test P3500.0Rotating Weight:psi96000.0Lbs25 95044501035753.00850Weight:Rotating96000.0LbsBlocks/Top Drive Weight:43000.0Lbs30111053575125804.00825Weight:Blocks/Top Drive43000.0LbsDesired PIT EMW:18.5ppg35131063575146955.00811Estimates for Test:6.8bblsEstimates for Test:1189psi 2.3 bbls40145073575168006.007981145 164088651835757.00786EMW = Leak-off Pressure + Mud Weight =50180093560209208.00776 0.052 x TVD0.052 x3008552120103560229729.00767ppg60 237015102024356010.0075665 27052035507029502535507533003035408035959.5Bbls8.5Bbls2.8Bbls3.0BblsComments:During csg test Increased rate at 50 strokes. CONOCOPHILLIPS Alaska, Inc.Pumping down97210.9Go to PIT Plot.+PIT 15 SecondShut-in Pressure, psiVolume PumpedVolume Bled BackVolume InputPRESSURE INTEGRITY TESTType of Test:Casing TestPressure IntegrityTestHole DepthCasing Shoe DepthCasing Size and Description:Pump Rate: 3/9/2023J. Benedict / P. AngelleVolume/Stroke0.50Pumping0.1182Doyon 25MT7-11Volume Bled BackShut-inPumpingShut-inVolume Pumped05001000150020002500300035004000109876543210PRESSURECASING TESTLEAK-OFF TESTPIT PointBarrels305101520250Shut-In time, Minutestest,Lost 35 psi duringheld 99% of test pressure.MT7-11 Surface casing and LOT 03_09_23.xlsxSummaryEMW at 3747 Ft-MD (3007.9 Ft-TVD) =16.0 Page 8/38 MT7-11 Report Printed: 3/30/2023 Operations Summary (Detailed) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 3/7/2023 08:00 3/7/2023 09:00 1.00 SURFAC, CASING RURD R/U 13-3/8" casing running equipment w/ casing swedge and safety valve and volant. 3,757.0 3,757.0 0.00 3/7/2023 09:00 3/7/2023 10:00 1.00 SURFAC, CASING PUTB P/U 13-3/8" 68ppf L-80 H563 shoe track thread lock same. Circulate shoe track (all good) 3,757.0 3,757.0 0.00 3/7/2023 10:00 3/7/2023 10:30 0.50 SURFAC, CASING SVRG Service top drive 3,757.0 3,757.0 0.00 3/7/2023 10:30 3/7/2023 12:00 1.50 SURFAC, CASING PUTB Continue P/U and run 13-3/8" 68ppf L -80 H563 casing from 88' MD to 295' MD. 3,757.0 3,757.0 0.00 3/7/2023 12:00 3/7/2023 14:00 2.00 SURFAC, CASING PUTB Continue P/U and run 13-3/8" 68ppf L -80 H563 casing from 295' MD to 1,096' MD. 3,757.0 3,757.0 0.00 3/7/2023 14:00 3/7/2023 14:30 0.50 SURFAC, CASING CIRC Circulate BTM's up at 1,096' MD GPM: 340 PSI: 86 3,757.0 3,757.0 0.00 3/7/2023 14:30 3/7/2023 18:00 3.50 SURFAC, CASING PUTB Continue P/U and run 13-3/8" 68ppf L -80 H563 casing from 1,096' MD to 2,324' MD. Tagged with 25k SO: 145k 3,757.0 3,757.0 0.00 3/7/2023 18:00 3/7/2023 18:30 0.50 SURFAC, CASING RURD Reset low pressure riser on drilling nipple. 3,757.0 3,757.0 0.00 3/7/2023 18:30 3/7/2023 20:00 1.50 SURFAC, CASING RURD P/U 13-3/8" casing and wash from 2,324' MD to 2,488' MD, Worked through tight spot with 20-30k and 100-120psi differential pressure. GPM: 200 PSI: 80 FPH: 500 PU: 171k SO: 153k 3,757.0 3,757.0 0.00 3/7/2023 20:00 3/7/2023 21:00 1.00 SURFAC, CASING PUTB Continue P/U and run 13-3/8" 68ppf L -80 H563 casing from 2,488' MD to 2,788' MD. Tagged with 35k SO: 145k 3,757.0 3,757.0 0.00 3/7/2023 21:00 3/8/2023 00:00 3.00 SURFAC, CASING RURD P/U 13-3/8" casing and wash from 2,488' MD to 3,326' MD, At 3,253' MD lowerd pump to 84gpm and increased run speed to 700'/hr. GPM: 200 PSI: 125 FPH: 500 PU: 171k SO: 168k 3,757.0 3,757.0 0.00 3/8/2023 00:00 3/8/2023 01:30 1.50 SURFAC, CASING PUTB P/U 13-3/8" casing and wash from 3,326' MD to 3,708' MD, At 3,253' MD lowerd pump to 84gpm and increased run speed to 700'/hr. GPM: 200 PSI: 125 FPH: 500 PU: 171k SO: 168k 3,757.0 3,757.0 0.00 3/8/2023 01:30 3/8/2023 02:00 0.50 SURFAC, CASING OTHR R/U pump T and valves on Volant, M/U hanger and landing joint. Wash in hole at 2bpm and land hanger. 3,757.0 3,757.0 0.00 Rig: DOYON 25 Page 9/38 MT7-11 Report Printed: 3/30/2023 Operations Summary (Detailed) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 3/8/2023 02:00 3/8/2023 03:30 1.50 SURFAC, CEMENT CIRC Circulate and condition mud stage pumps from 2bpm to 8bpm. reciprocate pipe 15'. GPM: 336 PSI: 180 3,757.0 3,757.0 0.00 3/8/2023 03:30 3/8/2023 07:30 4.00 SURFAC, CEMENT CMNT Blow down top drive, test lines to 4500psi (all ok) Mix and pump 100 bbls of 11.0 ppg Mud Push II @ 4.0 bbls/min, 352 psi, Dropped bottom plug. Start batching lead. Pump 423 bbls of 11.0 ppg DeepCRETE cement at 5.5 bbls/min, 435 psi ICP. Batch and pump 73 bbls of G Blend Tail 15.8 ppg cement @ 4.5 bbls/min, 280 psi. Drop top plug & kick out with 20 bbls of fresh H2O. Swap to rig & displace @ 8 bbls/min, 280 psi ICP, 610 psi FCP. Slow pumps 20 bbls prior to calculated bump to 3 bbls/min, 370 psi ICP, 388 psi FCP, Bump plug with 925 psi (527 bbls + 20 bbls). 4454 strokes, final circ. PSI 388 Pressure up to 925 psi & hold for 5 minutes. Bleed off pressure, Check floats good. 60 bbls cement to surface. Cement in place @ 07:27hrs 3/8/23 full returns. Check floats (all good) 3,757.0 3,757.0 0.00 3/8/2023 07:30 3/8/2023 08:30 1.00 SURFAC, CEMENT PRTS Drain and flush riser and flow line. Test casing to 3500psi 30min (good test) pumped 9.5bbls and returned 8.5bbls. 3,757.0 3,757.0 0.00 3/8/2023 08:30 3/8/2023 12:45 4.25 SURFAC, CEMENT NUND Back out landing joint, clean surface equipment, ND riser/lines.ND surface bag and set back. Pull 90' MH. RD surface diverter and Tee. SIMOPS: Cleanning mud pits. 3,757.0 3,757.0 0.00 3/8/2023 12:45 3/8/2023 14:30 1.75 SURFAC, WHDBOP NUND NU and orientate WH. Test seals to 1000psi (CPAI witnessed) 3,757.0 3,757.0 0.00 3/8/2023 14:30 3/8/2023 23:00 8.50 SURFAC, WHDBOP NUND Nipple up drilling riser & BOPE SIMOPS- Clean pits, slide Joe's box, install flow line, choke & kill lines, N/U MPD equipment. 3,757.0 3,757.0 0.00 3/8/2023 23:00 3/9/2023 00:00 1.00 SURFAC, WHDBOP PRTS Set test plug and install MPD test cap, test to 250/1250psi 5/10min. 3,757.0 3,757.0 0.00 3/9/2023 00:00 3/9/2023 01:00 1.00 SURFAC, WHDBOP MPDA Continue test MPD, Pull test cap. 0030-0200: Install 5" test joing and service lines. Bonnet ntest BOP's. 0200-0215: Test BOP's 0215-0330: Trouble shoot, repair BOP test pump. 0330-0600: Test BOP's 3,757.0 3,810.0 53.00 3/9/2023 01:00 3/9/2023 01:30 0.50 SURFAC, WHDBOP SVRG Inspect and rebuild test pump. 3,757.0 3,810.0 53.00 Rig: DOYON 25 MT7-11 Intermediate Casing Well:MT7-11 9-5/8", 47#, T95 & 43.5#, L80, H563 Int Csg Date:3/16/2023 Rig:Doyon 25 Depth Jt Number Joints Well Equipment Description and Comments Length Tops Page 1 RKB to Top Of String or RKB to Lock Down Screws RKB to LLDS 38.76 FMC 9-5/8" Casing Hanger 1.38 38.76 9-5/8" 43.5# L-80 Casing Pup jt. H563 Pin x Pin 3.31 40.14 Jts 117 to 287 171 Jts 9-5/8" 43.5# L80 H563 Casing Joint 7425.29 43.45 Jts 4 to 116 113 Jts 9-5/8" 47# T95 H563 Casing Joint 4819.38 7468.74 Jts 3 to 3 1 Jts 9-5/8" 47# T95 H563 Baker Lok Joint 42.52 12288.12 9-5/8" Davis Lynch Float Collar, H563 2.80 12330.64 Jts 1 to 2 2 Jts 9-5/8" 47# T95 H563 Casing Joint 87.00 12333.44 9-5/8" Davis Lynch Float Shoe, H563 3.09 12420.44 12423.53 12423.53 Spare 43.5#, A 43.52, B 43.64, C 43.56, D 43.38, E 43.09 12423.53 Spare 47#, A 43.46, B 43.46, C 41.55, D 42.98, E 43.50 12423.53 Pups 47# 4.67', 9.64', 14.67', 19.68' 12423.53 12423.53 12423.53 12423.53 12423.53 12423.53 12423.53 Centralizers 12423.53 9.625 x 12 Centeks 1 per 3 jts in surface casing = 28 12423.53 9.625 x 12 HydroForm 1 per joint across cemented interval = 33 12423.53 9.625 x 12 Centeks 1 per joint across cemented interval = 76 12423.53 Bakerlock to Pin of Joint #4 12423.53 12423.53 12423.53 12423.53 12423.53 12423.53 12423.53 Shoe @ 12,423.53' MD, 7,349.61' TVD 12423.53 TD @ 12,434' MD, 12423.53 Estimated TOC 7794' MD 12423.53 12423.53 Remarks: 9-5/8" 47#, T95, H563, 15.8k Ft/lbs with Best-O-Life 2000 AG Up Wt 360 K 9-5/8" 43.5# L80 H563, 14.3k Ft/lbs with Best-O-Life 2000 AG Dn Wt 230 K Block Wt 43 K Rig Supervisors: J. Benedict / P. Angelle Well Name: Rig: Date:Drilling Supervisor:Pump used:3Strokesarrels234Casing Test Pressure Integrity TestHole Size:88.5RKB-CHF:36.5Ft12424.0Ft-MD7350.0Ft-TVD12454.0Ft-MD7365.0Ft-TVD Strks psi Min psi Strks psi Min psi8.835 50003540 0 00.00975824013530 2 930.25965Mud Weight: 11.5ppg Mud Weight:11.50ppg16 43023521 4 1551.00959Mud 10 min Gel: 25.0Lb/100 Ft2 Mud 10 min Gel:23.0Lb/100 Ft224 63533514 6 1922.00951Test Pressure: 3500.0psi Rotating Weight:96000.0Lbs32 81043506 8 2393.00943Rotating Weight: 43000.0LbsBlocks/Top Drive Weight:43000.0Lbs40 98553501 10 2804.00935Blocks/Top Drive Weight:43000.0Lbs Desired PIT EMW:14.0ppg48 116563495 12 3255.00927Estimates for Test: 11.8 bbls Estimates for Test: 956 psi 3.2 bbls56 135073489 14 3706.009191164 150083483 16 4157.00911EMW = Leak-off Pressure + Mud Weight =72 169093477 18 4608.00905 0.052 x TVD 0.052 x 735080 1870103470 20 5079.0089814.1ppg88 2055153446 22 55010.0089196 2240203424 24 597104 2430253405 26 644112 2630303396 28 697120 2825 30 735128 3030 32 778136 3220 34 818144 3420 36 860150 3540 38 90440 94542 98012.7 Bbls12.5Bbls 3.6 Bbls3.1BblsComments:CONOCOPHILLIPS Alaska, Inc.Pumping downEMW at 12424 Ft-MD (7350 Ft-TVD) =96511.5980+PIT 15 SecondShut-in Pressure, psiVolume PumpedVolume Bled BackVolume InputPRESSURE INTEGRITY TESTType of Test:Casing TestPressure IntegrityTestHole DepthCasing Shoe DepthCasing Size and Description:Pump Rate: 3/18/2023R. Reinhardt / P. AngelleVolume/Stroke6.00Pumping0.0846MT7-11 Doyon 25Volume Bled BackShut-in Pumping Shut-inVolume Pumped050010001500200025003000350040000 2 4 6 8 101214PRESSURECASING TESTLEAK-OFF TESTPIT PointBarrelsppg0 5 10 15 20 25 30Shut-In time, MinutesLost 144 psi during test, held 95.9% of test pressure.MT7-11 9.625in Csg-FIT 3-18-23.xlsxSummary Page 8/ 3M/ T7-188 Report Printed: M3M03202M Operations Summary (Detailed) Job: DRILLING ORIGINAL 7ime Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 3/14/2023 18:00 3/15/2023 00:00 6.00 INTRM1, TRIPCAS BKRM BROOH from 7,725' MD to 6,604' MD. At 5,630' and 4,410' MD, Pump 30bbls NP sweep and continue BROOH slow, sweep returned on time with slight increase in cuttings. High torque from 5,730' to 5,648' MD. GPM: 1000 PSI: 3450 ROT: 125k ECD: 12.6ppg RPM: 120 TQ: 10-15k ft/lbs F/O: 55% 12,434.0 12,434.0 0.00 3/15/2023 00:00 3/15/2023 04:00 4.00 INTRM1, TRIPCAS BKRM Continue BROOH @ 3,966' high torque 23k, continue work string out hole. @ 3,886' MD high torque continue 17-22k at 75-125'/Hr back reaming. After back reaming normal torque 5.7-6.2k. Pump 30bbl Nutplug sweep at 3,886' MD. No change in cuttings returned. At 3,834' MD while BROOH torque returned to normal, from 16 to 6.2k. 12,434.0 12,434.0 0.00 3/15/2023 04:00 3/15/2023 05:00 1.00 INTRM1, TRIPCAS CIRC Pump 2 Nutplug sweeps and circulate SS. GPM: 1033 PSI: 2550 ECD: 12.2ppg 12,434.0 12,434.0 0.00 3/15/2023 05:00 3/15/2023 05:30 0.50 INTRM1, TRIPCAS OWFF OWFF (static) Blow down top drive. line up hole fill. 12,434.0 12,434.0 0.00 3/15/2023 05:30 3/15/2023 07:15 1.75 INTRM1, TRIPCAS TRIP Trip out hole on elevators from 3,747' MD to 562' MD. 12,434.0 12,434.0 0.00 3/15/2023 07:15 3/15/2023 07:30 0.25 INTRM1, TRIPCAS OWFF OWFF (static) 12,434.0 12,434.0 0.00 3/15/2023 07:30 3/15/2023 10:00 2.50 INTRM1, TRIPCAS BHAH Rack back HWT and collars, L/D Intermediate 1 BHA. 12,434.0 12,434.0 0.00 3/15/2023 10:00 3/15/2023 11:30 1.50 INTRM1, TRIPCAS WWWH Pull wear ring and wash BOP stack. 12,434.0 12,434.0 0.00 3/15/2023 11:30 3/15/2023 12:30 1.00 INTRM1, TRIPCAS OTHR Close Blind rams and chang out top rams to 9-5/8" casing rams. 12,434.0 12,434.0 0.00 3/15/2023 12:30 3/15/2023 14:00 1.50 INTRM1, TRIPCAS PRTS R/U 9-5/8" test joing and test annular 250/3500 5/10 min. R/D test equipment. AOGCC. Kam StJohn waived witness 3-14-23 @ 05:46hrs. 12,434.0 12,434.0 0.00 3/15/2023 14:00 3/15/2023 16:00 2.00 INTRM1, CASING RURD R/U 9-5/8" casing equipment. AOGCC, Kam StJohn waived witness 3-14-23 @ 0546hrs. BLM, Mutasim Elganzoory Notification recieved 3-14-23 @ 1001hrs. 12,434.0 12,434.0 0.00 3/15/2023 16:00 3/15/2023 22:30 6.50 INTRM1, CASING PUTB PJSM, P/U 9-5/8" shoe track, sheck floats (all good) Continue running 9- 5/8" 47# H563 casing to 3,747' MD. 12,434.0 12,434.0 0.00 Rig: DOYON 25 Page 893M/ T7-188 Report Printed: M3M03202M Operations Summary (Detailed) Job: DRILLING ORIGINAL 7ime Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 3/15/2023 22:30 3/15/2023 23:30 1.00 INTRM1, CASING CIRC Fill pipe, break circulation and stage pumps up to 336gpm 250psi. Full returns with no change in cutting on BTM's up. GPM: 336 PSI: 250 PU: 158k SO: 150k 12,434.0 12,434.0 0.00 3/15/2023 23:30 3/16/2023 00:00 0.50 INTRM1, CASING PUTB Continue running 9-5/8" 47# H563 casing from 3,747' MD to 4,139' MD. PU: 158k SO: 150k 12,434.0 12,434.0 0.00 3/16/2023 00:00 3/16/2023 06:00 6.00 INTRM1, CASING PUTB Continue running 9-5/8" 47# H563 casing on elevators from 4,139' MD to 8,338' MD. 12,434.0 12,434.0 0.00 3/16/2023 06:00 3/16/2023 09:30 3.50 INTRM1, CASING PUTB Continue running 9-5/8" 47# H563 casing on elevators from 8,338' MD to 10,740' MD. Set down at 10,740' MD, P/U break over at 390k. 12,434.0 12,434.0 0.00 3/16/2023 09:30 3/16/2023 11:30 2.00 INTRM1, CASING WASH Stage pumps up to 4bpm 463psi, Wash in hole with reduce pump rate 2bpm from 10,740' MD to 10, 851' MD. Stage pump up to 6bpm 511psi. No overpull or packoff observed. 12,434.0 12,434.0 0.00 3/16/2023 11:30 3/16/2023 12:00 0.50 INTRM1, CASING PUTB Continue running 9-5/8" 47# H563 casing on elevators from 10,851' MD to 11,071' MD. 12,434.0 12,434.0 0.00 3/16/2023 12:00 3/16/2023 16:00 4.00 INTRM1, CASING WASH Wash in hole from 11,114' MD to 12,424' MD. working casing to bottom. GPM: 84 PSI: 450-525 PU:360k SO: 145k 12,434.0 12,434.0 0.00 3/16/2023 16:00 3/16/2023 17:00 1.00 INTRM1, CEMENT HOSO Pump out hole from 12,424' MD to 12,383' MD, M/U hanger and landing joint. Wash in hole at 2bpm 480psi and land hanger with 230k. PU: 350k 12,434.0 12,434.0 0.00 3/16/2023 17:00 3/16/2023 19:00 2.00 INTRM1, CEMENT CIRC Circulate and condition mud at 12,424' MD stage pumps up to 8bpm 440psi. Mud 12.1ppg in/out 12,434.0 12,434.0 0.00 3/16/2023 19:00 3/16/2023 20:30 1.50 INTRM1, CEMENT CIRC Blow down top drive and R/U cement hose. establish circulation through cement hose 7bpm 575psi. While restaging trucks. (water truck broke down before job, second water truck busted line during job) SIMOPS: PJSM, cement crews 12,434.0 12,434.0 0.00 Rig: DOYON 25 Page 203M/ T7-188 Report Printed: M3M03202M Operations Summary (Detailed) Job: DRILLING ORIGINAL 7ime Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 3/16/2023 20:30 3/17/2023 00:00 3.50 INTRM1, CEMENT CMNT Line up cement unit. flush w/ 2 bbls FW. Test lines to 3500psi. Good test. Mix and pump 60bbls 12.5ppg mud push II at 4 bpm. SD and drop bottom plug. Mix and pump 191bbls 13.0 ppg G lead cement at 5.2bpm, Mix and pump 152bbls 15.8 ppg G Tail cement at 4.5 bpm. SD and drop top plug. Pump 20 bbls FW w/ cement unit. Swap over to rig pumps and begin displace cement at 8bpm to catch cement (20bbls) lower rate to 6BPM and continue displacing cement and reduce rate as needed for ballmill/trucks. slow pump rate to 3bpm 26bbls early. bumped plug at 905bbls (1bbl early) FCP 887psi, pressure up to 1400psi, hold 5 min, bled off (floats holding) cement in place 3-17-23 @ 0128hrs. 12,434.0 12,434.0 0.00 3/17/2023 00:00 3/17/2023 01:30 1.50 INTRM1, CEMENT CMNT Finish displacing cement, Swap over to rig pumps and begin displace cement at 8bpm to catch cement (20bbls) lower rate to 6BPM and continue displacing cement and reduce rate as needed for ballmill/trucks. slow pump rate to 3bpm 26bbls early. bumped plug at 905bbls (1bbl early) FCP 887psi, pressure up to 1400psi, hold 5 min, bled off (floats holding) cement in place 3-17-23 @ 0128hrs. 12,434.0 12,434.0 0.00 3/17/2023 01:30 3/17/2023 02:00 0.50 INTRM1, CEMENT OWFF Check floats (all good) 12,434.0 12,434.0 0.00 3/17/2023 02:00 3/17/2023 03:00 1.00 INTRM1, CEMENT PRTS R/U to test casing, trouble priming mud pump. swap pumps and pressure up casing to 3600psi pumped 13bbls, slight leak, attempt to trouble shoot leak. Hose to test chart released off quick connect. Bled off pressure to 0psi (one hour into testing, abort pressure test) 12,434.0 12,434.0 0.00 3/17/2023 03:00 3/17/2023 05:00 2.00 INTRM1, WHDBOP WWSP R/D service lines and volant. Pull and L/D landing joint. Run packoff and test 12,434.0 12,434.0 0.00 3/17/2023 05:00 3/17/2023 08:30 3.50 INTRM1, WHDBOP PRTS Set test plug and purge equipment. Test UPR and Annular with 5" test joints 250/3500psi 5/10min. Weekly BOP function test, 12,434.0 12,434.0 0.00 3/17/2023 08:30 3/17/2023 09:30 1.00 INTRM1, DRILLOUT OTHR R/D test equipment and pull test joint. Install wear ring 12,434.0 12,434.0 0.00 3/17/2023 09:30 3/17/2023 10:30 1.00 INTRM1, DRILLOUT BHAH Move BHA components to rig floor. Service rig 12,434.0 12,434.0 0.00 3/17/2023 10:30 3/17/2023 12:30 2.00 INTRM1, DRILLOUT SLPC Hang block and Slip and cut 64' Drill line. Calibrate AMPHION and Pason. Check COM (all good) Clear rig floor. SIMOPS: Changing liners in pumps to 5.5", finish cleanning pits and dress shakers. 12,434.0 12,434.0 0.00 3/17/2023 12:30 3/17/2023 16:30 4.00 INTRM1, DRILLOUT BHAH P/U 8-1/2" X 9-7/8" Intermedate #2 BHA to 549' MD. 12,434.0 12,434.0 0.00 Rig: DOYON 25 INFORMATION REGARDING: MT7-98 MT7-98 13-3/8" Surface Casing Well:MT7-98 13-3/8" 68# H563 Date:7/29/2022 Rig:Doyon 25 Depth Jt Number Joints Well Equipment Description and Comments Length Tops Page 1 RKB to Top Of String or RKB to Lock Down Screws Doyon RKB to Top of Landing Ring 40.05 FMC 13-3/8" Casing Hanger 1.30 40.05 13-3/8" 68# L-80 Casing Pup jt. H563 Pin X H563 Pin 2.43 41.35 Jts 4 to 79 76 Jts 13-3/8" 68# L-80 Surface Casing H563 3226.32 43.78 Jts 3 to 3 1 Jts 13-3/8" 68# L-80 Surface Casing H563 Bakerlok to FC 42.90 3270.10 13-3/8" HES H563 Float Collar 2.33 3313.00 Jts 1 to 2 2 Jts 13-3/8" 68# L-80 Surface Casing H563 85.91 3315.33 13-3/8"HES H563 Composite Float Shoe 2.25 3401.24 3403.49 3403.49 3403.49 3403.49 3403.49 3403.49 3403.49 3403.49 3403.49 3403.49 3403.49 3403.49 3403.49 Pup joint : 4.85' , 9.87', 15.27'3403.49 3403.49 Spare joints: 3403.49 3403.49 Total 76 jnts in pipe shed.3403.49 Total 3 Shoe track joints 3403.49 6 jnts on rack outside. (4 of them marked for spares)3403.49 Total on locating 82joint + 3 shoe track 3403.49 Total 45 Centek SII centralizers 13-3/8" X 16"3403.49 3403.49 A= 43.14 3403.49 B= 40.30 3403.49 C= 41.87 3403.49 D= 41.38 3403.49 Remarks: MU Tq with Volant - Bakerlocked to pin of joint #4 Up Wt 221K Dn Wt 188K H563 torqued to 25k ft/lbs with BOL 2000 Arctic Grade Block Wt 43 K Rig Supervisors: J. Benedict / P. Angelle Well Name: Rig: Date:Drilling Supervisor:Pump used:2Strokesarrels434Casing TestPressure Integrity TestHole Size:10RKB-CHF:40.1Ft3403.5Ft-MD3054.0Ft-TVD3433.0Ft-MD3083.5Ft-TVDStrkspsiMinpsiStrkspsiMinpsi12.4 2425003620 2 780.00124285251362041350.25Mud Weight: 10.7ppgMud Weight:10.9ppg128302361562130.50Mud 10 min Gel: 25.0Lb/100 Ft2Mud 10 min Gel:25.0Lb/100 Ft21610703361583001.001222Test Pressure: 3500.0psi Rotating Weight:96000.0Lbs20 128043610 10 3901.50Rotating Weight: 96000.0LbsBlocks/Top Drive Weight:43000.0Lbs24153053610124822.001209Blocks/Top Drive Weight:43000.0LbsDesired PIT EMW:18.5ppg28178063610145732.50Estimates for Test:6.2bblsEstimates for Test:1207psi 2.1 bbls32203573610166623.0012001136 230083610 18 7503.50EMW = Leak-off Pressure + Mud Weight =40258093605208364.001195 0.052 x TVD0.052 x3054442850103605229204.5018.7ppg48 3140153605 24 10025.00119252 3420203600 26 10285.505436202536002810886.0011893036003011506.503212427.0011877.508.0011848.509.0011839.5010.0011816.4Bbls6.0Bbls3.8Bbls2.6BblsComments:Pulsation dampener closed at 22 strokes. CONOCOPHILLIPS Alaska, Inc.Pumping downEMW at 3403.49 Ft-MD (3054 Ft-TVD) =Fill in FIT Columns ==>10.91242+PIT 15 SecondShut-in Pressure, psiVolume PumpedVolume Bled BackVolume InputPRESSURE INTEGRITY TESTType of Test:Casing TestPressure IntegrityTestHole DepthCasing Shoe DepthCasing Size and Description:Pump Rate: 7/31/2022J. Benedict / P. AngelleVolume/Stroke0.50Pumping0.1182MT7-98 Doyon 25Volume Bled BackShut-in Pumping Shut-inVolume Pumped0500100015002000250030003500400001234567PRESSURECASING TESTLEAK-OFF TESTPIT PointBarrels0 5 10 15 20 25 30Shut-In time, MinutesLost 20 psi during test, held 99.4% of test pressure.MT7-98 Surface casing and FIT 07_30_22.xlsxSummary Page 5/31 MT7-98 Report Printed: 3/30/2023 Operations Summary (Detailed) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 7/28/2022 11:30 7/28/2022 13:00 1.50 SURFAC, TRIPCAS BKRM BROOH from 1000' MD to 603' MD GPM: 745 PSI: 1560 RPM: 50 TQ: 3k ECD:11.5 RTW 83k 3,310.0 3,413.0 103.00 7/28/2022 13:00 7/28/2022 13:30 0.50 SURFAC, TRIPCAS OWFF Flow check well 3,310.0 3,413.0 103.00 7/28/2022 13:30 7/28/2022 14:30 1.00 SURFAC, TRIPCAS BKRM BROOH from 603' MD to 244' MD GPM: 745 PSI: 1560 RPM: 50 TQ: 3k ECD:11.5 RTW 83k 3,310.0 3,413.0 103.00 7/28/2022 14:30 7/28/2022 15:00 0.50 SURFAC, TRIPCAS OWFF Flow check well while conduct PJSM for L/D BHA. 3,310.0 3,413.0 103.00 7/28/2022 15:00 7/28/2022 17:30 2.50 SURFAC, TRIPCAS BHAH From 244' MD L/D BHAas per Baker rep. 3,310.0 3,413.0 103.00 7/28/2022 17:30 7/28/2022 18:30 1.00 SURFAC, CASING BHAH Clean and clear rig floor. 3,310.0 3,413.0 103.00 7/28/2022 18:30 7/28/2022 20:30 2.00 SURFAC, CASING RURD Mobilize 13-3/8 handling equipment to the rig floor and rig up to run casing. 3,310.0 3,413.0 103.00 7/28/2022 20:30 7/28/2022 21:00 0.50 SURFAC, CASING SFTY PJSM P/U casing shoe and run 13- 3/8" casing. 3,310.0 3,413.0 103.00 7/28/2022 21:00 7/28/2022 21:30 0.50 SURFAC, CASING EQRP Change out bad seal on Volant tool. 3,310.0 3,413.0 103.00 7/28/2022 21:30 7/29/2022 00:00 2.50 SURFAC, CASING PUTB M/U 13-3/8" 68# casing shoe track , pump through to check float equipment and run in hole to 857' MD SO 85K 3,310.0 3,413.0 103.00 7/29/2022 00:00 7/29/2022 00:30 0.50 SURFAC, CASING PUTB Continue RIH with 13-3/8 surface casing from 857' MD to 1072' MD 3,413.0 3,413.0 0.00 7/29/2022 00:30 7/29/2022 01:00 0.50 SURFAC, CASING CIRC Bring pump rate up slowly to 8BPM and CBU while reciprocate pipe. from 1072' MD to 1115' MD 3,413.0 3,413.0 0.00 7/29/2022 01:00 7/29/2022 10:30 9.50 SURFAC, CASING PUTB Continue RIH with 13-3/8 surface casing from 1,115' MD to 3363' MD, Encounter tight spot at 1685', 1716', 1740' to1832', 2305' to 2426' MD. Wash through at 2 to 8 BPM. 3,413.0 3,413.0 0.00 7/29/2022 10:30 7/29/2022 11:00 0.50 SURFAC, CASING HOSO MU 13 3/8" csg hanger and landing joint. 5ft in and land csg at 3,403' MD. Wash down at 3 bpm 163psi. 3,413.0 3,413.0 0.00 7/29/2022 11:00 7/29/2022 13:00 2.00 SURFAC, CEMENT CIRC Circulate and condition mud. Stage up rate to 8 bpm 340psi. Reciprocating string from 3,403' MD to 3,383' MD. PU: 208k SO: 180k 3,413.0 3,413.0 0.00 Rig: DOYON 25 Page 6/31 MT7-98 Report Printed: 3/30/2023 Operations Summary (Detailed) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 7/29/2022 13:00 7/29/2022 14:00 1.00 SURFAC, CEMENT CIRC SD. Blow down TD. RU cement lines to swivel on Volant tool. Break circulation and stage rate back to 8bpm. 200psi. Reciprocating string 3,403' MD to 3,395' MD. Hold PJSM w/ cementers while circulating. PU: 208k SO: 180k 3,413.0 3,413.0 0.00 7/29/2022 14:00 7/29/2022 18:30 4.50 SURFAC, CEMENT CMNT SLB pump 3 bbls of fresh H2O. Tested lines to 3500 psi, pump 100 bbls of 10.9 ppg Mud Push II @ 4.2 bbls/min, 225 psi, 6.7% F/O, Dropped bottom plug. Start batching lead. Pump 378.2 bbls of 11.0 ppg DeepCRETE cement at 5.1 bbls/min, 320 psi ICP, F/O 4.2%. Batch and pump 74.8 bbls of G Blend Tail 15.8 ppg cement @ 4.5 bbls/min, 203 psi, F/O 4.6%. Drop top plug & kick out with 20 bbls of fresh H2O. Swap to rig & displace w/ 11 ppg mud @ 8 bbls/min, 514 psi, F/O 18.6%. Bump plug with 1074 psi (475 bbls + 20 bbls). 4017 strokes, final circ. PSI 514 @ 3 bpm, Pressure up to 1074 psi & hold for 5 minutes. Bleed off pressure, Check floats, Floats holding, 121 bbls 11.0 ppg cement to surface. 3,413.0 3,413.0 0.00 7/29/2022 18:30 7/29/2022 19:30 1.00 SURFAC, CEMENT RURD RD cementers and casing equipment. Drain stack. LD landing joint. Flush riser/valves w/ black water. Drain black water f/ stack. 3,413.0 3,413.0 0.00 7/29/2022 19:30 7/30/2022 00:00 4.50 SURFAC, CEMENT NUND ND riser/lines.ND surface bag and set back. Pull 90' MH. RD surface diverter and Tee. 3,413.0 3,413.0 0.00 7/30/2022 00:00 7/30/2022 01:00 1.00 SURFAC, WHDBOP NUND Install casing & tubing spool as per FMC, Orient same, 3,413.0 3,413.0 0.00 7/30/2022 01:00 7/30/2022 06:00 5.00 SURFAC, WHDBOP NUND Nipple up drilling riser & BOPE SIMOPS- Clean pits, slide Joe's box, install flow line, choke & kill lines, N/U MPD equipment Test FMC wellhead seal t/ 1,000 psi f/ 10 minutes test witnessed by COPA 3,413.0 3,413.0 0.00 7/30/2022 06:00 7/30/2022 07:00 1.00 SURFAC, WHDBOP MPDA Fill BOPs and MPD skid, Test MPD equipment 250psi/1250psi 5min/10min. 3,413.0 3,413.0 0.00 7/30/2022 07:00 7/30/2022 08:00 1.00 SURFAC, WHDBOP BOPE Test annular with 5" drill pipe 250/3500psi 3,413.0 3,413.0 0.00 7/30/2022 08:00 7/30/2022 09:00 1.00 SURFAC, WHDBOP RGRP Trouble shoot test pump, Change out valves and seats on test pump. 3,413.0 3,413.0 0.00 Rig: DOYON 25 MT7-98 Intermediate Casing Well:MT7-98 9-5/8", 47#, T95 & 43.5#, L80, H563 Int Csg Date:8/4/2022 Rig:Doyon 25 Depth Jt Number Joints Well Equipment Description and Comments Length Tops Page 1 RKB to Top Of String or RKB to Lock Down Screws RKB to LLDS 36.75 FMC 9-5/8" Casing Hanger 1.00 36.75 9-5/8" 43.5# L-80 Casing Pup jt. H563 Pin x Pin 3.29 37.75 Jts 119 to 208 90 Jts 9-5/8" 43.5# L80 H563 Casing Joint 3902.70 41.04 Jts 3 to 118 116 Jts 9-5/8" 47# T95 H563 Casing Joint 4989.93 3943.74 9-5/8" Davis Lynch Float Collar, H563 2.77 8933.67 Jts 1 to 2 2 Jts 9-5/8" 47# T95 H563 Casing Joint 86.49 8936.44 9-5/8" Davis Lynch Float Shoe, H563 3.09 9022.93 9026.02 9026.02 9026.02 Spare 43.5#, A 43.52, B 43.46, C 43.52, D 43.42 9026.02 Spare 47#, A 43.53, B 42.94, C 43.50, D 43.34, E 43.18 9026.02 Pups 47# 4.66', 9.64', 14.67', 19.67' 9026.02 9026.02 9026.02 9026.02 9026.02 9026.02 9026.02 Centralizers 9026.02 9.625 x 12 Centeks 1 per 3 jts in surface casing = 26 9026.02 9.625 x 12 Centeks 1 per joint across cemented interval = 69 9026.02 Bakerlock to Pin of Joint #4 9026.02 9026.02 9026.02 9026.02 9026.02 9026.02 9026.02 9026.02 Shoe @ 9026' MD, X' TVD 9026.02 TD @ 9036' MD, X' TVD 9026.02 9026.02 9026.02 Remarks: 9-5/8" 47#, T95, H563, 15.8k Ft/lbs with Best-O-Life 2000 AG Up Wt X K 9-5/8" 43.5# L80 H563, 14.3k Ft/lbs with Best-O-Life 2000 AG Dn Wt X K Block Wt 43 K Rig Supervisors: J. Benedict / P. Angelle Well Name: Rig: Date:Drilling Supervisor:Pump used:2Strokesarrels234Casing Test Pressure Integrity TestHole Size:88.5RKB-CHF:36.8Ft9026.0Ft-MD7461.0Ft-TVD9056.0Ft-MD7485.0Ft-TVD Strks psi Min psi Strks psi Min psi8.835 50003525 0 00.00990616513525 3 900.25950Mud Weight: 11.5ppg Mud Weight:11.5ppg12 28023525 6 1800.50950Mud 10 min Gel: 5.0Lb/100 Ft2 Mud 10 min Gel:5.0Lb/100 Ft218 41033510 9 2601.00950Test Pressure: 3500.0psi Rotating Weight:200000.0Lbs24 54043510 12 3501.50950Rotating Weight: 200000.0LbsBlocks/Top Drive Weight:43000.0Lbs30 67053500 15 4402.00925Blocks/Top Drive Weight:43000.0Lbs Desired PIT EMW:14.0ppg36 80563500 18 5202.50925Estimates for Test: 7.7 bbls Estimates for Test: 970 psi 2.1 bbls42 93073500 21 6103.009251148 103083500 24 7003.50910EMW = Leak-off Pressure + Mud Weight =54 114593500 27 7904.00910 0.052 x TVD 0.052 x 746160 1260103500 30 8804.5091014.1ppg66 1375153500 33 9905.0091072 1490203500 365.5091078 1610253500 396.0090084 17353035006.5090090 18557.0090096 19807.50900102 21008.00900108 22308.50900114 23609.00900120 25009.50890126 262510.00890132 2755138 2890144 3020150 3155156 3290162 3420168 3520169 352514.3 Bbls8.5Bbls 3.3 Bbls3.3BblsComments:9-5/8" Casing test w/ Versa clean to 3500psi, FIT to 14.0 ppg EMW with 11.5 ppg Versaclan OBM and 990 psi surface pressure.CONOCOPHILLIPS Alaska, Inc.Pumping downEMW at 9026 Ft-MD (7461 Ft-TVD) =95011.5990+PIT 15 SecondShut-in Pressure, psiVolume PumpedVolume Bled BackVolume InputPRESSURE INTEGRITY TESTType of Test:Casing TestPressure IntegrityTestHole DepthCasing Shoe DepthCasing Size and Description:Pump Rate: 8/6/2022J. Benedict / P. AngelleVolume/Stroke6.00Pumping0.0846MT7-98 Doyon 25Volume Bled BackShut-in Pumping Shut-inVolume Pumped050010001500200025003000350040000246810121416PRESSURECASING TESTLEAK-OFF TESTPIT PointBarrels0 5 10 15 20 25 30Shut-In time, MinutesLost 25 psi during test, held 99.3% of test pressure.MT7-98 Intermdiate 1 csg test and FIT 07-02-2022.xlsxSummary Page 13/31 MT7-98 Report Printed: 3/30/2023 Operations Summary (Detailed) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 8/3/2022 21:30 8/4/2022 00:00 2.50 INTRM1, CASING PUTB PJSM, Make up shoe track, baker lock first 4 joints. Check floats (all ok) Pump through shoe track (all ok) Continue P/U 9-5/8" 47# T95 H563 casing from 135' MD to 1,077' MD 9-5/8" 47# torqued to 15.8k 9,036.0 9,036.0 0.00 8/4/2022 00:00 8/4/2022 04:00 4.00 INTRM1, CASING PUTB Continue P/U 9-5/8" 47# T95 H563 casing from 135' MD to 3,396' MD PU: 163k SO: 150k 9-5/8" 47# torqued to 15.8k 9,036.0 9,036.0 0.00 8/4/2022 04:00 8/4/2022 04:45 0.75 INTRM1, CASING CIRC Circulate at 3,396' MD staging pumps up to 6bpm 217psi (circ btm's up 2500stks) 9,036.0 9,036.0 0.00 8/4/2022 04:45 8/4/2022 08:00 3.25 INTRM1, CASING PUTB Continue P/U 9-5/8" 47# T95 H563 casing from 3,396' MD to 5,550' MD PU: 243k SO: 192k 9-5/8" 47# torqued to 15.8k 9-5/8" 43.5# torqued to 14.3k 9,036.0 9,036.0 0.00 8/4/2022 08:00 8/4/2022 09:00 1.00 INTRM1, CASING CIRC Circulate at 5,550' MD staging pumps up to 6bpm 276psi (circ btm's up 3700stks) 9,036.0 9,036.0 0.00 8/4/2022 09:00 8/4/2022 12:30 3.50 INTRM1, CASING PUTB Continue P/U 9-5/8" 47# T95 H563 casing from 5,550' MD to 7,500' MD SO: 200k 9-5/8" 43.5# torqued to 14.3k 9,036.0 9,036.0 0.00 8/4/2022 12:30 8/4/2022 14:00 1.50 INTRM1, CASING CIRC Circulate at 7,500' MD staging pumps up to 6bpm 431psi (circ btm's up 5400stks) 9,036.0 9,036.0 0.00 8/4/2022 14:00 8/4/2022 16:30 2.50 INTRM1, CASING PUTB Continue P/U 9-5/8" 47# T95 H563 casing from 7,500' MD to 8,982' MD No mud losses SO: 165k 9-5/8" 43.5# torqued to 14.3k 9,036.0 9,036.0 0.00 8/4/2022 16:30 8/4/2022 17:00 0.50 INTRM1, CASING HOSO Make up FMC hanger and landing joint, Land hanger with 165k. Shoe: 9,026' MD FC: 8,933' MD 9,036.0 9,036.0 0.00 8/4/2022 17:00 8/4/2022 19:30 2.50 INTRM1, CEMENT CIRC Circulate and condition mud at 9026' MD stage pumps up 1/2bbls stages from 1/2bpm to 6bpm 500psi No mud losses Max gas btm's up 1833hrs 903 units 9,036.0 9,036.0 0.00 Rig: DOYON 25 Page 14/31 MT7-98 Report Printed: 3/30/2023 Operations Summary (Detailed) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Operation Start Depth (ftKB) End Depth (ftKB) Depth Prog (ft) 8/4/2022 19:30 8/5/2022 00:00 4.50 INTRM1, CEMENT CMNT PJSM.Line up cement unit. flush w/ 3 bbls FW. Test lines to 3500psi. Good test. Mix and pump 60bbls 12.5ppg mud push II at 4 bpm. SD and drop bottom plug. Mix and pump 78bbls 13 ppg G lead cement at 4.5 bpm, Mix and pump 159bbls 15.8 ppg G Tail cement at 4.5 bpm. SD and drop top plug. Pump 20 bbls FW w/ cement unit and swap over to rig pumps. Displace w/ rig pumps @ 6 bpm. Swap over to rig pumps and Displace cement at 6bpm1290psi 595bbls slow rate to 4bpm 1114psi slow rate to 2bpm 1022psi. Shut down pump at 648bbls pumped. Note: Bottom plug bumped late calculated volume on bottom plug landing. (pumped 237bbls after btm plug landed) 20bbls lost during cement job. SD and monitor f/ 5 minutes. Top plug did not bump. Bleed off and check floats. Floats holding. Cement in place @ 00:20hrs 8/5/22 9,036.0 9,036.0 0.00 8/5/2022 00:00 8/5/2022 02:30 2.50 INTRM1, CEMENT CMNT Continue displacing cement, Cement in place at 0020hrs. FCP (max strokes) at 2bpm 1022psi. (plugged didn't bmp) Shut down, check floats (all ok) R/D cement equipment and L/D landing joint. 9,036.0 9,036.0 0.00 8/5/2022 02:30 8/5/2022 03:30 1.00 INTRM1, WHDBOP WWSP Install FMC 9-5/8" packoff and test to 5000psi 10min. (Good Test witness by CPAI) 9,036.0 9,036.0 0.00 8/5/2022 03:30 8/5/2022 04:00 0.50 INTRM1, WHDBOP OTHR Change UPR from 9-5/8" fix to 4-1/2" x 7" rams. 9,036.0 9,036.0 0.00 8/5/2022 04:00 8/5/2022 05:00 1.00 INTRM1, WHDBOP RURD R/U 5" test joint. Purge stack. 9,036.0 9,036.0 0.00 8/5/2022 05:00 8/5/2022 10:00 5.00 INTRM1, WHDBOP BOPE Test UPR 250/3500psi 5min/10min, change test joint to 7" test annular and UPR 250/3500psi 5min/10min. (trouble with test joint add sub on btm to relocate seal area) Witness waived Changing out UPR from 9.625" to 4-1/2" x 7" and test by AOGCC Austin McLeod at 08:51hrs 8 -3-22 9,036.0 9,036.0 0.00 8/5/2022 10:00 8/5/2022 10:30 0.50 INTRM1, WHDBOP RURD R/D test equipment and clear floor. 9,036.0 9,036.0 0.00 8/5/2022 10:30 8/5/2022 13:30 3.00 INTRM1, DRILLOUT BHAH PJSM, P/U 8.5" X 9.875" BHA #3 RIH to 546' MD. 9,036.0 9,036.0 0.00 8/5/2022 13:30 8/5/2022 18:00 4.50 INTRM1, DRILLOUT TRIP Continue TIH from 546' MD to 8,738' MD 9,036.0 9,036.0 0.00 8/5/2022 18:00 8/5/2022 20:00 2.00 INTRM1, DRILLOUT SLPC Cut and slip 55' drill line. Reset and function crown/floor saver. SIMOPS: circulate at 400gpm 1750psi 9,036.0 9,036.0 0.00 8/5/2022 20:00 8/5/2022 21:00 1.00 INTRM1, DRILLOUT PRTS Test 9-5/8" casing to 3500psi 30min (good test) pumped 14.3bbls returned 9.5bbls. 9,036.0 9,036.0 0.00 Rig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✔ &KULV%ULORQ :HOOV(QJLQHHULQJ0DQDJHU 1LQD$QGHUVRQ QLQDDQGHUVRQ#FRQRFRSKLOOLSVFRP  By Anne Prysunka at 1:32 pm, Aug 08, 2022  &':  '65'/%  Approved Sundry 322-025. CDW 08/09/2022 97/   GWV -/&  Jeremy Price Digitally signed by Jeremy Price Date: 2022.08.16 12:08:53 -08'00' RBDMS JSB 082322 $2*&&5HJXODWLRQV$$& E 'HVLJQDWLRQRIWKHZHOORUZHOOVWRUHFHLYHGULOOLQJZDVWHV07 7KHGHSWKWRWKHEDVHRIIUHVKZDWHUDTXLIHUVDQGSHUPDIURVW LISUHVHQW 7KHUHDUHQR86':DTXLIHUVLQWKH*UHDWHU0RRVHV7RRWK 8QLW(VWLPDWHGEDVHRI3HUPDIURVW ¶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ó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wp05 MT7-99wp02 MT7-08$OOZHOOVKLJKOLJKHGLQEOXHDUHZLWKLQDTXDWHUPLOH/DVW8SGDWH 685)$&(&$6,1*6+2(6(3$5$7,21)52007 /DWHUDOGLVWDQFHLQIHHWEHWZHHQVXUIDFHFDVLQJVKRHVLQWKH;<SODQH1RWHWKDWWKLVVKHHWLVQRWWKHGHILQLWLYHUHFRUGIRUDQQXODUGLVSRVDOYROXPHV866WDWH3ODQH        DdϳͲϬϮ 3DJH 07 5HSRUW3ULQWHG 2SHUDWLRQV6XPPDU\ 'HWDLOHG -RE'5,//,1*25,*,1$/ 7LPH/RJ 6WDUW7LPH (QG7LPH 'XU KU 3KDVH $FWLYLW\&RGH 2SHUDWLRQ 6WDUW'HSWK IW.% (QG'HSWK IW.% 'HSWK3URJ IW      685)$&'5,// ''5/ 'ULOO´KROHI¶WR¶0'   79' N:2% *30 36, 530 N74 N38 N62 N527 KUV$57 KUV77/%LWKUV KUV-DU         685)$&75,3&$6 %.50 %522+I W #%8SHU  VWDQG *30 36, 530 N74         685)$&75,3&$6 2:)) )ORZFKHFN6WDWLF         685)$&75,3&$6 %.50 %522+I W  *30 36, 530 N74         685)$&75,3&$6 &,5& &%8[ *30 36, 530 N74         685)$&75,3&$6 75,3 $WWHPSWWR322+RQHOHYDWRUV  2EVHUYHGNRQVWVWG5,+DQG  DWWHPSWDJDLQ6DPHUHVXOW'HFLGHWR  SXPSRXWRIKROH         685)$&75,3&$6 %.50 %522+I W  *30 36, 530 N74         685)$&75,3&$6 3032 3XPSRXWRIKROHI W %+$ *30 36,         685)$&75,3&$6 3032 3XPSRXWRIKROHI W  *30 36,         685)$&75,3&$6 2:)) )ORZFKHFN6WDWLF3-60RQOD\LQJ  GRZQ%+$         685)$&75,3&$6 %+$+ /D\GRZQ%+$         685)$&&$6,1* &/(1 &OHDQFOHDUULJIORRU0RYHFDVLQJ  HTXLSPHQWWRULJIORRU         685)$&&$6,1* 585' 58WRUXQFDVLQJ         685)$&&$6,1* 387% 3-6008VKRHWUDFN7KUHDGORFN  FRQQHFWLRQV&KHFNIORDWV JRRG 5XQ  +\G/FDVLQJWR   0874N    5LJ'2<21 3DJH 07 5HSRUW3ULQWHG 2SHUDWLRQV6XPPDU\ 'HWDLOHG -RE'5,//,1*25,*,1$/ 7LPH/RJ 6WDUW7LPH (QG7LPH 'XU KU 3KDVH $FWLYLW\&RGH 2SHUDWLRQ 6WDUW'HSWK IW.% (QG'HSWK IW.% 'HSWK3URJ IW      685)$&&$6,1* &,5& &%86WDJLQJSXPSVXSWRESP  SVL         685)$&&$6,1* 387% 5XQ+\G/FDVLQJ  I WR 0874N          685)$&&$6,1* :$6+ 6HWGRZQN:DVKGRZQI  WR ESPNZHLJKW          685)$&&$6,1* 387% 5XQ+\G/FDVLQJ  I WR 0874N          685)$&&$6,1* 387% 08&VJKDQJHUDQGODQGLQJMW:DVK  GRZQ#ESPSVL         685)$&&$6,1* :$6+ 6HWGRZQN# :RUN  FDVLQJDQGZDVKGRZQDQGODQG  KDQJHU# ESP  SVL         685)$&&$6,1* &,5& &LUFXODWHDQGFRQGLWLRQPXGIRU  FHPHQWMRE3-60IFHPHQWMRE         685)$&&(0(17 &017 &HPHQWVXUIDFHFDVLQJ 7HVWFHPHQWOLQHVSVL3XPS  EEOVSSJ0XG3XVK,,VSDFHU  'URSEWPSOXJ 0L[DQGSXPS  EEOV'HHS&UHWHSSJFHPHQW  &HPHQWZHWDWKUV 0L[DQG  SXPSEEOVSSJ*%OHQGWDLO  FHPHQW &HPHQWZHWDWKUV  'URSWRSSOXJSXPSEEOVZDWHU  ,VRODWH&HPHQWHUVDQGEORZGRZQ  FHPHQWOLQH 'LVSODFHFHPHQWZLWKULJSXPSDW  ESP6ORZWRESPZEEOVOHIW  3OXJEXPSHGDW KUV EEOV  SXPSHG#ESPSVLSUHVVXUHG  XSWRSVLPLQEOHGRII IORDWV  KROGLQJ )XOOUHWXUQVQRORVVHV7RWDO  FHPHQWWRVXUIDFHEEOV          685)$&&(0(17 585' 5'FDVLQJUXQQLQJHTXLSPHQW/'  ODQGLQJMRLQW&OHDQHGDQGFOHDUHGULJ  IORRU)OXVKHGDOOFHPHQW  FRQWDPLQDWHGOLQHVWKRURXJKO\Z  EODFNZDWHU)OXVKHGVXUIDFHULVHUDQG  DQQXODUZEODFNZDWHU&OHDQHG  FHPHQWYDOYHV         685)$&:+'%23 585' 3XOOPDVWHUEXVKLQJV&OHDQIORZER[  DQGIORZOLQH%'MHWDQGKROHILOOOLQHV  1'ULVHUIOXVKDQGUHPRYHVXUIDFH  DQQXODU3XOO PRXVHKROH38KLJK  SUHVVXUHULVHUV         685)$&:+'%23 585' ,QVWDOOFDVLQJ WXELQJVSRRODVSHU  )0&2ULHQWVDPH1LSSOHXSGULOOLQJ  ULVHUV %23(6,02366OLGHIORZ  ER[LQVWDOOIORZOLQHFKRNH NLOOOLQHV  1803'HTXLSPHQW7HVW)0&  ZHOOKHDGVHDOWSVLI  PLQXWHVWHVWZLWQHVVHGE\&23$  3% ,QVWDOO PRXVHKROH6HWWHVW  SOXJDQGUHPRYHGWHVWMRLQW08  )269 ,%23WRWHVWFDS&OHDQLQJ  PXGSLWVDQGWDNLQJRQQHZPXG          685)$&:+'%23 %23( ,QVWDOO03'WHVWFDSIORRGVWDFN  OLQHV7HVW03'SVLORZ  PLQXWHVSVLKLJKIPLQXWHV  DVSHU03'5HS    5LJ'2<21 3DJH 07 5HSRUW3ULQWHG &HPHQW'HWDLO5HSRUW &HPHQW'HWDLOV 'HVFULSWLRQ 6XUIDFH6WULQJ&HPHQW &HPHQWLQJ6WDUW'DWH  &HPHQWLQJ(QG'DWH  :HOOERUH1DPH 07 &RPPHQW 7HVWFHPHQWOLQHVSVL3XPSEEOVSSJ0XG3XVK,,VSDFHU 'URSEWPSOXJ 0L[DQGSXPSEEOV'HHS&UHWHSSJFHPHQW &HPHQWZHWDW  KUV 0L[DQGSXPSEEOVSSJ*%OHQGWDLOFHPHQW &HPHQWZHWDWKUV 'URSWRSSOXJSXPSEEOVZDWHU,VRODWH&HPHQWHUVDQGEORZGRZQ  FHPHQWOLQH 'LVSODFHFHPHQWZLWKULJSXPSDWESP&RQWLQXHGLVSODFLQJ3OXJEXPSHGDW KUV EEOVSXPSHG#ESPSVLSUHVVXUHGXSWRSVLPLQEOHG  RII IORDWVKROGLQJ )XOOUHWXUQVQRORVVHV7RWDOFHPHQWWRVXUIDFHEEOV  &HPHQW6WDJHV 6WDJH 'HVFULSWLRQ 6XUIDFH6WULQJ&HPHQW 2EMHFWLYH 0HW 7RS'HSWK IW.%  %RWWRP'HSWK IW.%  )XOO5HWXUQ" <HV 9RO&HPHQW«  7RS3OXJ" <HV %WP3OXJ" <HV 43XPS,QLW EEOP«  43XPS)LQDO EEO«  43XPS$YJ EEO«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ñVDFN  0L[+5DWLR JDOVD«  )UHH:DWHU  'HQVLW\ OEJDO  3ODVWLF9LVFRVLW\ F3 7KLFNHQLQJ7LPH KU &PSU6WU SVL $GGLWLYHV $GGLWLYH 7\SH &RQFHQWUDWLRQ &RQF8QLWODEHO )OXLG )OXLG7\SH 7DLO&HPHQW )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.%  (VW%WP IW.%  $PRXQW VDFNV  &ODVV * 9ROXPH3XPSHG EEO  <LHOG IWñVDFN  0L[+5DWLR JDOVD«  )UHH:DWHU  'HQVLW\ OEJDO  3ODVWLF9LVFRVLW\ F3 7KLFNHQLQJ7LPH KU &PSU6WU SVL $GGLWLYHV $GGLWLYH 7\SH &RQFHQWUDWLRQ &RQF8QLWODEHO 6WULQJ6XUIDFH6WULQJ&HPHQW -RE'5,//,1*25,*,1$/MREVXEW\S!«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ŽƐƚϰϵƉƐŝĚƵƌŝŶŐƚĞƐƚ͕ŚĞůĚϵϴ͘ϳйŽĨƚĞƐƚƉƌĞƐƐƵƌĞ͘076XUIDFHFDVLQJDQG),75HY[OV[6XPPDU\ 3DJH 07 5HSRUW3ULQWHG 2SHUDWLRQV6XPPDU\ 'HWDLOHG -RE'5,//,1*25,*,1$/ 7LPH/RJ 6WDUW7LPH (QG7LPH 'XU KU 3KDVH $FWLYLW\&RGH 2SHUDWLRQ 6WDUW'HSWK IW.% (QG'HSWK IW.% 'HSWK3URJ IW      ,175075,3&$6 %.50 %522+I WR ZLWKIXOO  UHWXUQV2EVHUYHGODUJHSLHFHVRIFOD\  EULFNVL]H FRPLQJRYHUWKHVKDNHUV  LQWHUPLWWHQWO\ *30 36, 530 N74 SSJ(&'         ,175075,3&$6 &,5& $WWHPSWWRSXOOZLWKRXWSXPSLQJRU  URWDWLRQLQWRVKRH2EVHUYHGN  RYHUSXODQGVZDEELQJ3XPSHGLQWR  VKRHZLWKIXOOUHWXUQV 38 *30 36,         ,175075,3&$6 &,5& &LUFXODWH[EEOQXWSOXJVZHHSV   [ERWWRPVXSV 2EVHUYHGODUJHFOD\  SLHFHVFRQWLQXLQJWRFRPHEDFN *30 36, 530 N74 (&' 1RWH*RRGLQFUHDVHRIFOD\ EULFN  VL]H DFURVVVKDNHUVZKHQVZHHSV  FDPHEDFN         ,175075,3&$6 %.50 &RQWLQXH%522+I WR  ZLWKIXOOUHWXUQV2EVHUYHGODUJHFOD\  SLHFHVFRQWLQXLQJWRFRPRYHUWKH  VKDNHUVLQWHUPLWWHQWO\  *30 36, 530 N74 SSJ(&'         ,175075,3&$6 %.50 &RQWLQXH%522+I WR  ZLWKIXOOUHWXUQV2EVHUYHGFOD\SLHFHV  VORZO\GHFUHDVLQJXQWLOVKDNHUVFOHDQ  RQODVWVWDQGV *30 36, 530 N74 SSJ(&'         ,175075,3&$6 75,3 72+RQHOHYDWRUVI WR%+$  PRQLWRULQJKROHILOO         ,175075,3&$6 2:)) 2:))ZHOOVWDWLF         ,175075,3&$6 %+$+ 32+DQG/'%+$&OHDUULJIORRU 3-60SULRUWRUHPRYLQJ5$VRXUFHV         ,1750&$6,1* :::+ 5HWULHYHZHDUEXVKLQJ-HWVWDFNDQG  ZHOOKHDG 6LP2SV0RYHFDVLQJHTXLSPHQWWR  ULJIORRU    5LJ'2<21 3DJH 07 5HSRUW3ULQWHG 2SHUDWLRQV6XPPDU\ 'HWDLOHG -RE'5,//,1*25,*,1$/ 7LPH/RJ 6WDUW7LPH (QG7LPH 'XU KU 3KDVH $FWLYLW\&RGH 2SHUDWLRQ 6WDUW'HSWK IW.% (QG'HSWK IW.% 'HSWK3URJ IW      ,1750&$6,1* %23( &KDQJHRXW835WRIL[HG  UDPV 6LP2SV0RYLQJFDVLQJHTXLSPHQWWR  ULJIORRU         ,1750&$6,1* %23( 5,+ZWHVWMRLQW6HWWHVWSOXJ  7HVWDQQXODU&DVLQJUDPVDJDLQVW  WHVWMRLQWWRSVLSVL  PLQPLQ*RRGWHVW5'WHVW  HTXLSPHQW3XOOWHVWSOXJ/'WHVWMW %/04XLQQ6DZ\HUZDLYHGZLWQHVV         ,1750&$6,1* 585' 58FDVLQJHTXLSHQWWRUXQFDVLQJ  9RODQWWRROHOHYDWRUVVOLSVVWUDS  WRQJV 3-60IRUUXQQLQJFDVLQJ         ,1750&$6,1* 387% 08DQGEDNHUORFN)6MW  VKRHWUDFN)&EDNHUORFNWKUHDGV  WKURXJKSLQRI-73XPSWKURXJK  VKRHWUDFNDQGFKHFNIORDWV*RRG         ,1750&$6,1* 387% 5,+Z/+FDVLQJ  I WR &HQWUDOL]HUVUDQDV  SHUSURJUDP7RSILOOHDFKMRLQWDQG  WRSRIIHYHU\MRLQWVZLWKSSJ  PXG 6,2036&KDQJHG0XG3XPS  OLQHUVIURPWR         ,1750&$6,1* 387% 5,+Z/+FDVLQJ  I WR &HQWUDOL]HUVUDQDV  SHUSURJUDP7RSILOOHDFKMRLQWDQG  WRSRIIHYHU\MRLQWVZLWKSSJ  PXG0874N 1RWH/DLGRXW-W ER[  GDPDJHGOLIWQXEZRXOGQRWPDNH  XS          ,1750&$6,1* 38/' &KDQJHRXW9RODQWWRROGLHVVSLGHU  VOLSVDQGHOHYDWRUVWR  6,0236PRQLWRUZHOOVWDWLF         ,1750&$6,1* 38/' 5,+Z[FURVVRYHUMRLQW  [ SXSMRLQWDQG  /7;3FDVLQJI WR   0874N 7RSILOOHDFKMRLQWDQGWRSRIIHYHU\  MRLQWVZLWKSSJPXG         ,1750&$6,1* &,5& &LUFXODWHERWWRPVXSVWDJLQJXSWR  ESPZLWKIXOOUHWXUQV6KDNHUVFOHDQ  RQERWWRPVXS QRFXWWLQJV  36, *30 62         ,1750&$6,1* 38/' 5,+Z/7;3FDVLQJI   WR0874N 7RSILOOHDFKMRLQWDQGWRSRIIHYHU\  MRLQWVZLWKSSJPXG         ,1750&$6,1* 387% 5,+Z/7;3FDVLQJI   WR 0874N 7RSILOOHDFKMRLQWDQGWRSRIIHYHU\  MRLQWVZLWKSSJPXG    5LJ'2<21 3DJH 07 5HSRUW3ULQWHG 2SHUDWLRQV6XPPDU\ 'HWDLOHG -RE'5,//,1*25,*,1$/ 7LPH/RJ 6WDUW7LPH (QG7LPH 'XU KU 3KDVH $FWLYLW\&RGH 2SHUDWLRQ 6WDUW'HSWK IW.% (QG'HSWK IW.% 'HSWK3URJ IW      ,1750&$6,1* &,5& &LUFXODWHERWWRPVXSVWDJLQJXSWR  ESPZLWKIXOOUHWXUQV0LQLPDOILQHV  RYHUVKDNHUVRQERWWRPVXS 36, *30 62         ,1750&$6,1* 387% 5,+Z/7;3FDVLQJI   WR 0874N  &HQWUDOL]HUVUDQDVSHUSURJUDP  7RSILOOHDFKMRLQWDQGWRSRIIHYHU\  MRLQWVZLWKSSJPXG 6,0236&KDQJLQJ03OLQHUVIURP  WR         ,1750&$6,1* &,5& &LUFXODWH%86WDJHSXPSVXSWR  %302$EVHUYHGJRRGDPRXQWRI  ILQHVDFURVVVKDNHUV&OHDQHGXS  PLQLPDOILQHVDFURVVVKDNHUVDIWHU  %8 %30SVL %30SVL %30SVL %30SVL         ,1750&$6,1* 387% 5,+Z/7;3FDVLQJI   WR 0874N  &HQWUDOL]HUVUDQDVSHUSURJUDP  7RSILOOHDFKMRLQWDQGWRSRIIHYHU\  MRLQWVZLWKSSJPXG         ,1750&$6,1* &,5& 7DJRQWLJKWVSRWZ.38  DQGVORZO\HVWDEOLVKFLUFXODWLRQ  :DVKLQJGRZQI WR ZLWK  IXOOUHWXUQV %30SVL %30SVL 62 38         ,1750&$6,1* &,5& :DVKLQJGRZQI WR ZLWK  IXOOUHWXUQV %30SVL 62 38 QRWEUHDNLQJRYHU         ,1750&$6,1* &,5& :DVKLQJGRZQI WR ZLWK  IXOOUHWXUQV %30SVL 62 38 QRWEUHDNLQJRYHU         ,1750&$6,1* &,5& 08KDQJHUDQGODQGLQJMRLQW  :DVKGRZQI WR DQG  ODQGKDQJHU 6ORZZDVKLQJGRZQIURPWRS+5=DW    %30 SVL 62ZHLJKWSULRUWRODQGLQJ    5LJ'2<21 3DJH 07 5HSRUW3ULQWHG 2SHUDWLRQV6XPPDU\ 'HWDLOHG -RE'5,//,1*25,*,1$/ 7LPH/RJ 6WDUW7LPH (QG7LPH 'XU KU 3KDVH $FWLYLW\&RGH 2SHUDWLRQ 6WDUW'HSWK IW.% (QG'HSWK IW.% 'HSWK3URJ IW      ,1750&(0(17 &,5& &LUFXODWHVWDJLQJXSWRESPZLWKIXOO  UHWXUQV'LVSODFHSSJWR  SSJPXG %30SVLSSJ %30SVLSSJ %30SVLSSJ 6,0236&HPHQWHUVDUULYHGRQ  ORFDWLRQDWKUVDQG58         ,1750&(0(17 &017 /LQHXSFHPHQWXQLWIOXVKZEEOV  ):7HVWOLQHVWRSVL*RRGWHVW  0L[DQGSXPSEEOVSSJPXG  SXVK,,DWESP6'DQGGURSERWWRP  SOXJ0L[DQGSXPSEEOVSSJ  *FHPHQWDWESP6'DQGGURS  WRSSOXJ3XPSEEOV):Z  FHPHQWXQLWDQGVZDSRYHUWRULJ  SXPSV'LVSODFHZULJSXPSV#  ESP         ,1750&(0(17 ',63 'LVSODFHFHPHQWZULJSXPSV#  ESP2VHUYHGERWWRPSOXJODQGDQG  VKHDUSVL3UHVVXUHVSLNHDV  FHPHQWWXUQHGWKHFRUQHUSVL  6ORZHGUDWHVWRESPSVL  3UHVVXUHVWDELOL]HGDWSVL6WDJHG  EDFNXSWRESPDWSVL*RRG  UHWXUQVWKURXJKRXWGLVSODFHPHQW1R  ORVVHVREVHUYHG6ORZUDWHWRESP  ZLWKEEOVOHIWLQGLVSODFHPHQW  %XPSHGSOXJVWNV FDOFXODWHG  VWNV )LQDOSUHVVXUHSVL  3UHVVXUHXSSVLRYHUWRSVL  +HOGIPLQXWHVDQGEOHHGRIIEEOV  UHWXUQHG)ORDWVKHOG3OXJGRZQ#  KUV         ,1750&(0(17 585' 5'FDVLQJHTXLSPHQW&OHDQFOHDUULJ  IORRU         ,1750:+'%23 3576 'UDLQVWDFN6HWSDFNRIISHU)0&  7HVWSDFNRIIWRSVLIPLQXWHV  *RRGWHVW:LWQHVVHGE\'69         ,1750:+'%23 %23( &KDQJHRXW835WR;9%5  7HVWZWHVWMRLQW5HWULHYHWHVW  MRLQW,QVWDOOWHVWMRLQW7HVW835  DQGDQQXODUZWHVWMRLQW$OOWHVWV  SVLORZKLJKPLQXWHV  HDFK5'WHVWHTXLSPHQW $2*&&$XVWLQ0F/HRGZLWQHVV  ZDLYHGE\HPDO#  DP         ,1750:+'%23 %23( ,QVWDOO:HDU%XVKLQJDVSHU)0&5HS         ,1750:+'%23 6/3& 6OLS &XW 'ULOOOLQH5HFDOLEUDWH  3DVRQDQG$PSKLRQ         ,1750'5,//287 %+$+ 3-6038%+$[  %+$:7 .         ,1750'5,//287 75,3 5,+Z%+$RQ'3I W   6KDOORZWHVWDW *RRG  WHVW *30 36, 38 62    5LJ'2<21 3DJH 07 5HSRUW3ULQWHG &HPHQW'HWDLO5HSRUW &HPHQW'HWDLOV 'HVFULSWLRQ ,QWHUPHGLDWH6WULQJ&HPHQW &HPHQWLQJ6WDUW'DWH  &HPHQWLQJ(QG'DWH  :HOOERUH1DPH 07 &RPPHQW /LQHXSFHPHQWXQLWIOXVKZEEOV):7HVWOLQHVWRSVL*RRGWHVW0L[DQGSXPSEEOVSSJPXGSXVK,,DWESP6'DQGGURSERWWRPSOXJ0L[  DQGSXPSEEOVSSJ*FHPHQWDWESP6'DQGGURSWRSSOXJ3XPSEEOV):ZFHPHQWXQLWDQGVZDSRYHUWRULJSXPSV'LVSODFHFHPHQWZULJ  SXPSV#ESP2VHUYHGERWWRPSOXJODQGDQGVKHDUSVL3UHVVXUHVSLNHDVFHPHQWWXUQHGWKHFRUQHUSVL6ORZHGUDWHVWRESPSVL3UHVVXUH  VWDELOL]HGDWSVL6WDJHGEDFNXSWRESPDWSVL*RRGUHWXUQVWKURXJKRXWGLVSODFHPHQW1RORVVHVREVHUYHG6ORZUDWHWRESPZLWKEEOVOHIWLQ  GLVSODFHPHQW%XPSHGSOXJVWNV FDOFXODWHGVWNV )LQDOSUHVVXUHSVL3UHVVXUHXSSVLRYHUWRSVL+HOGIPLQXWHVDQGEOHHGRIIEEOV  UHWXUQHG)ORDWVKHOG3OXJGRZQ#KUV &HPHQW6WDJHV 6WDJH 'HVFULSWLRQ ,QWHUPHGLDWH6WULQJ  &HPHQW 2EMHFWLYH &07;&6*  7 DERYH6XVLWQD 6DQG 7RS'HSWK IW.%  %RWWRP'HSWK IW.%  )XOO5HWXUQ" <HV 9RO&HPHQW«  7RS3OXJ" <HV %WP3OXJ" <HV 43XPS,QLW EEOP«  43XPS)LQDO EEO«  43XPS$YJ EEO«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ñVDFN  0L[+5DWLR JDOVD«  )UHH:DWHU  'HQVLW\ OEJDO  3ODVWLF9LVFRVLW\ F3 7KLFNHQLQJ7LPH KU &PSU6WU SVL $GGLWLYHV $GGLWLYH 7\SH &RQFHQWUDWLRQ &RQF8QLWODEHO 6WULQJ,QWHUPHGLDWH6WULQJ&HPHQW -RE'5,//,1*25,*,1$/MREVXEW\S!«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«7RS3OXJ" <HV %WP3OXJ" <HV 43XPS,QLW EEOP«  43XPS)LQDO EEO«  43XPS$YJ EEO«  33XPS)LQDO SVL  33OXJ%XPS SVL  5HFLS" 1R 6WURNH IW 5RWDWHG" 1R 3LSH530 USP 7DJJHG'HSWK IW.% 7DJ0HWKRG 'HSWK3OXJ'ULOOHG2XW7R IW.% 'ULOO2XW'LDPHWHU LQ &RPPHQW &HPHQW)OXLGV $GGLWLYHV )OXLG )OXLG7\SH ,QWHUPHGLDWH&HPHQW )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.%  (VW%WP IW.%  $PRXQW VDFNV &ODVV * 9ROXPH3XPSHG EEO  <LHOG IWñVDFN  0L[+5DWLR JDOVD«  )UHH:DWHU  'HQVLW\ OEJDO  3ODVWLF9LVFRVLW\ F3 7KLFNHQLQJ7LPH KU  &PSU6WU SVL $GGLWLYHV $GGLWLYH 7\SH &RQFHQWUDWLRQ &RQF8QLWODEHO 6WULQJ,QWHUPHGLDWH6WULQJ&HPHQW -RE'5,//,1*25,*,1$/MREVXEW\S!«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ŽƐƚϭϴƉƐŝĚƵƌŝŶŐƚĞƐƚ͕ŚĞůĚϵϵ͘ϱйŽĨƚĞƐƚƉƌĞƐƐƵƌĞ͘07,QWHUPGLDWHFVJWHVWDQG,17),7[OV[6XPPDU\        DdϳͲϬϱ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«  7RS3OXJ" <HV %WP3OXJ" <HV 43XPS,QLW EEOP«  43XPS)LQDO EEO«  43XPS$YJ EEO«  33XPS)LQDO SVL  33OXJ%XPS SVL  5HFLS" <HV 6WURNH IW 5RWDWHG" 1R 3LSH530 USP 7DJJHG'HSWK IW.% 7DJ0HWKRG 'HSWK3OXJ'ULOOHG2XW7R IW.% 'ULOO2XW'LDPHWHU LQ &RPPHQW &HPHQW)OXLGV $GGLWLYHV )OXLG )OXLG7\SH /HDG&HPHQW )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.%  (VW%WP IW.%  $PRXQW VDFNV &ODVV * 9ROXPH3XPSHG EEO <LHOG IWñVDFN  0L[+5DWLR JDOVD«  )UHH:DWHU  'HQVLW\ OEJDO  3ODVWLF9LVFRVLW\ F3  7KLFNHQLQJ7LPH KU  &PSU6WU SVL $GGLWLYHV $GGLWLYH 7\SH &RQFHQWUDWLRQ &RQF8QLWODEHO )OXLG )OXLG7\SH 7DLO&HPHQW )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.%  (VW%WP IW.%  $PRXQW VDFNV &ODVV * 9ROXPH3XPSHG EEO <LHOG IWñVDFN  0L[+5DWLR JDOVD«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ŽƐƚϰϭƉƐŝĚƵƌŝŶŐƚĞƐƚ͕ŚĞůĚϵϴ͘ϴйŽĨƚĞƐƚƉƌĞƐƐƵƌĞ͘076XUIDFHFVJWHVWDQG/27[OV[6XPPDU\ Transmittal #1304 Detail Date: 5/2/2022 To (External Party): From (CPAI Contact): Email*: meredith.guhl@alaska.gov Email*: richard.e.elgarico@conocophillips.com First Name*: Meredith First Name*: Ricky Last Name*: Guhl Last Name*: Elgarico Phone Number:(907) 793-1235 Phone Number: (907) 265-6580 Company: AOGCC Company: ConocoPhillips Address: 333 W. 7th Ave. Address: 700 G Street City: Anchorage City: Anchorage State: AK State: Alaska Zip Code: 99501 Zip Code: 99501 Transmittal Info Sent Via: ShareFile Tracking #: Justification: Compliance Data Detail Quantity*: Description*: Type*: 1 CD5-93 Sonic TOC LAS, PDF 1 MT7-01 Sonic TOC LAS, PDF 1 MT7-03 Sonic TOC LAS, PDF 1 MT7-04 Sonic TOC LAS, PDF 1 MT7-05 Sonic TOC LAS, PDF 1 MT7-09 Sonic TOC LAS, PDF 1 MT7-96 Sonic TOC LAS, PDF Attachments: Received By: ___________________________ Signature: ___________________________ Date: _________________ Approver: ___________________________ Signature: ___________________________ Date: _________________ MT7-03 Sonic TOC PTD:221-024 T36545 Kayla Junke Digitally signed by Kayla Junke Date: 2022.05.03 08:54:52 -08'00' DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20830-00-00Well Name/No. GMTU MT7-03Completion StatusWAGINCompletion Date7/17/2021Permit to Drill2210240Operator ConocoPhillips Alaska, Inc.MD21050TVD8176Current StatusWAGIN1/31/2022UICYesWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:GR, RES, PWD, DIR, AZI, DEN, NEU, CALIPER, POROSITY, ACOUSTIC, NMR, NBI, SONIC, MudNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScaleDF10/26/2021114 21051 Electronic Data Set, Filename: CPAI_MT7-03_FE_COMPOSITE_MEM.las35885EDDigital DataDF10/26/20218580 8824 Electronic Data Set, Filename: CPAI_MT7-03_FE_MADPASS RUN02_MEM.las35885EDDigital DataDF10/26/202119590 20280 Electronic Data Set, Filename: CPAI_MT7-03_FE_MADPASS RUN04_MEM.las35885EDDigital DataDF10/26/2021################Electronic Data Set, Filename: MT7-03_AP_TIME_MEM_RUN01.las35885EDDigital DataDF10/26/2021################Electronic Data Set, Filename: MT7-03_AP_TIME_MEM_RUN02.las35885EDDigital DataDF10/26/2021################Electronic Data Set, Filename: MT7-03_AP_TIME_MEM_RUN03.las35885EDDigital DataDF10/26/202112450 21000 Electronic Data Set, Filename: 6.5in_CPAI_MT7-03_MTK_LMR110_MD_run4_RA16.las35885EDDigital DataDF10/26/202111615 12560 Electronic Data Set, Filename: 6.5in_CPAI_MT7-03_MTK_LMR110_run3_RA16.las35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_AP_TIME_MEM_RUN01.ASC35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_AP_TIME_MEM_RUN02.ASC35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_AP_TIME_MEM_RUN03.ASC35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_mem_LTK_IMG_R2.dlis35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_mem_LTK_IMG_R3.dlis35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_mem_LTK_IMG_R4.dlis35885EDDigital DataMonday, January 31, 2022AOGCCPage 1 of 4Supplied byOpSupplied byOpCPAI_MT7-,03_FE_COMPOSITE_MEM.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20830-00-00Well Name/No. GMTU MT7-03Completion StatusWAGINCompletion Date7/17/2021Permit to Drill2210240Operator ConocoPhillips Alaska, Inc.MD21050TVD8176Current StatusWAGIN1/31/2022UICYesDF10/26/2021 Electronic File: MT7-03_mem_LTK_R2_LMG100_0240scl.pdf35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_mem_LTK_R3_LMG100_0240scl.pdf35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_mem_LTK_R4_LMG100_0240scl.pdf35885EDDigital DataDF10/26/2021 Electronic File: 6.5in_CPAI_MT7-03_MTK_LMR110_5MD_run3_RA16.PDF35885EDDigital DataDF10/26/2021 Electronic File: 6.5in_CPAI_MT7-03_MTK_LMR110_MD_run4_RA16.PDF35885EDDigital DataDF10/26/2021 Electronic File: SoundTrak - Acoustic- plots_digital data.zip35885EDDigital DataDF10/26/2021 Electronic File: StarTrak - Electrical Image - plots_digital data.zip35885EDDigital DataDF10/26/2021 Electronic File: CPAI_MT7-03_2MD_MEM.cgm35885EDDigital DataDF10/26/2021 Electronic File: CPAI_MT7-03_2TVD_MEM.cgm35885EDDigital DataDF10/26/2021 Electronic File: CPAI_MT7-03_5MD_MEM.cgm35885EDDigital DataDF10/26/2021 Electronic File: CPAI_MT7-03_5TVD_MEM.cgm35885EDDigital DataDF10/26/2021 Electronic File: CPAI_MT7-03_AP_TIME_MEM.cgm35885EDDigital DataDF10/26/2021 Electronic File: CPAI_MT7-03_2MD_MEM.pdf35885EDDigital DataDF10/26/2021 Electronic File: CPAI_MT7-03_2TVD_MEM.pdf35885EDDigital DataDF10/26/2021 Electronic File: CPAI_MT7-03_5MD_MEM.pdf35885EDDigital DataDF10/26/2021 Electronic File: CPAI_MT7-03_5TVD_MEM.pdf35885EDDigital DataDF10/26/2021 Electronic File: CPAI_MT7-03_AP_TIME_MEM.pdf35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_NAD 27_Compass Surveys_Canvas_0802021.txt35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_NAD 27_Compass Surveys_Macro_0802021.txt35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_NAD 27_Compass Surveys_Petrel_0802021.txt35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_NAD 27_Compass Surveys_Surveys_0802021.txt35885EDDigital DataMonday, January 31, 2022AOGCCPage 2 of 4 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20830-00-00Well Name/No. GMTU MT7-03Completion StatusWAGINCompletion Date7/17/2021Permit to Drill2210240Operator ConocoPhillips Alaska, Inc.MD21050TVD8176Current StatusWAGIN1/31/2022UICYesWell Cores/Samples Information:ReceivedStart Stop CommentsTotalBoxesSample SetNumberNameIntervalDF10/26/2021 Electronic File: MT7-03_NAD 27_Definitive Survey Report_08022021.pdf35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_NAD 83_Compass Surveys_Canvas_07192021.txt35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_NAD 83_Compass Surveys_Macro_07192021.txt35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_NAD 83_Compass Surveys_Petrel_07192021.txt35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_NAD 83_Compass Surveys_Surveys_07192021.txt35885EDDigital DataDF10/26/2021 Electronic File: MT7-03_NAD 83_Definitive Survey Report_07192021.pdf35885EDDigital Data0 0 2210240 GMTU MT7-03 LOG HEADERS35885LogLog Header ScansDF11/9/2021120 21050 Electronic Data Set, Filename: ConocoPhillips_MT07-03_Cuttings_Percentatges_120-21050ft_Final.las35927EDDigital DataDF11/9/20213533 21051 Electronic Data Set, Filename: ConocoPhillips_MT07-03_G8-GEOISOTOPES_Corrected data_3533-21050ft_FINAL.las35927EDDigital DataDF11/9/2021 Electronic File: 50-103-20830-00-00_MT7_03_DRILL_LOG_21050ft_FINAL.pdf35927EDDigital DataDF11/9/2021 Electronic File: 50-103-20830-00-00_MT7_03_GAS_RATIO_LOG_21050ft_FINAL.pdf35927EDDigital DataDF11/9/2021 Electronic File: 50-103-20830-00-00_MT7_03_MUDLOG_21050ft_FINAL.pdf35927EDDigital DataDF11/9/2021 Electronic File: MT7-03 _AOGCC_ML_trans_02NOV21.pdf35927EDDigital DataDF11/9/2021 Electronic File: MT7-03-Mudlogging End of Well Report_Final.pdf35927EDDigital Data0 0 2210240 GMTU MT7-03 LOG HEADERS35927LogLog Header ScansMonday, January 31, 2022AOGCCPage 3 of 403_Cuttings_Percentatges_120-21050ft_Final.las,ConocoPhillipsMT07-p__Corrected data_3533-_21050ft_FINAL.las:,ConocoPhillips MT07-03G8-p_ _p_GEOISOTOPES_ DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20830-00-00Well Name/No. GMTU MT7-03Completion StatusWAGINCompletion Date7/17/2021Permit to Drill2210240Operator ConocoPhillips Alaska, Inc.MD21050TVD8176Current StatusWAGIN1/31/2022UICYesINFORMATION RECEIVEDCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYComments:Compliance Reviewed By:Date:Mud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYDate CommentsDescriptionCompletion Date:7/17/2021Release Date:5/4/20218/17/2021200 2105061780CuttingsMonday, January 31, 2022AOGCCPage 4 of 4M. Guhl 1/31/2022 MEMORANDUM To: Jim Regg��� Z(�v P.I. Supervisor l FROM: Brian Bixby Petroleum Inspector Well Name GMTU MT7-03 Insp Num: mitBDB220117054138 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Friday, January 21, 2022 SUBJECT: Mechanical Integrity Tests ConocoPhillips Alaska, Inc. MT7-03 GMTU MT7-03 Src: Inspector Reviewed By: P.I. Supry J5p-- Comm API Well Number 50-103-20830-00-00 Inspector Name: Brian Bixby Permit Number: 221-024-0 Inspection Date: 1/16/2022 Friday, January 21, 2022 Page 1 of 1 Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well MT7-03 Type Inj I -W - TVD i 8263 Tubing 455 - 455 455. 455 PTD 2210240 BBL Pumped: P Type Testi SPT-ITest sl i YP P • 1.8 BBL Returned- 2066 IA 1120 1 8 OA 2500 2470 - 2465 - Interval INITAL PIF P 'I - -_1- Notes: Friday, January 21, 2022 Page 1 of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✔ ✔✔ ✔✔ &KULV%ULORQ :HOOV(QJLQHHULQJ0DQDJHU 1LQD$QGHUVRQ QLQDDQGHUVRQ#FRQRFRSKLOOLSVFRP  By Samantha Carlisle at 10:24 am, Jan 20, 2022  '/% '65 &':  &':  97/   dts 1/25/2022 JLC 1/25/2022 Jeremy Price Digitally signed by Jeremy Price Date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ó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¶79' 5.% $VWUDWLJUDSKLFGHVFULSWLRQRIWKHLQWHUYDOH[SRVHGWRWKHRSHQ DQQXOXVDQGRWKHULQIRUPDWLRQVXIILFLHQWWRVXSSRUWD FRPPLVVLRQILQGLQJWKDWWKHZDVWHZLOOEHFRQILQHGDQGZLOO QRWFRPHWRWKHVXUIDFHRUFRQWDPLQDWHIUHVKZDWHU $OLVWRIDOOSXEOLFO\UHFRUGHGZHOOVZLWKLQRQHTXDUWHUPLOH DQGDOOSXEOLFO\UHFRUGHGZDWHUZHOOVZLWKLQRQHPLOHRIWKH ZHOOWRUHFHLYHGULOOLQJZDVWH 6HHDWWDFKHGPDSLQGLFDWLQJZHOOVZLWKLQPLOH7KHUHDUH QRZDWHUZHOOVZLWKLQPLOH ,GHQWLI\WKHW\SHVDQGPD[LPXPYROXPHRIZDVWHWREH GLVSRVHGRIDQGWKHHVWLPDWHGGHQVLW\RIWKHZDVWHVOXUU\ 7\SHVRIZDVWHPD\EHGULOOLQJPXGGULOOLQJFXWWLQJVUHVHUYH SLWIOXLGVFHPHQWFRQWDPLQDWHGGULOOLQJPXGFRPSOHWLRQ IOXLGVGLHVHOIRUPDWLRQIOXLGVDVVRFLDWHGZLWKWKHDFWRI GULOOLQJDZHOOGULOOULJZDVKIOXLGVGRPHVWLFZDVWHZDWHU DQ\DGGHGZDWHUQHHGHGWRIDFLOLWDWHSXPSLQJRIGULOOLQJPXG RUGULOOLQJFXWWLQJVDQGDQ\RWKHUIOXLGVDVVRFLDWHGZLWK GULOOLQJDZHOO'HQVLWLHVUDQJHIURPGLHVHOWRJDO 0D[LPXPYROXPHWREHSXPSHGLVEEOV $GHVFULSWLRQRIDQ\ZDVWHVRXJKWWREHGHWHUPLQHGDV GULOOLQJZDVWHXQGHU K  RIWKLVVHFWLRQ &HPHQWULQVDWHPXGSODQWULQVHIOXLGJHQHUDWHGE\ULQVLQJ WDQNVDQGHTXLSHPHQWDIWHUSURGXFLQJGULOOLQJFRPSOHWLRQ IOXLG VHHLQFOXGHGQRWHIURP&' DXWKRUL]DWLRQ  $QHVWLPDWHRIPD[LPXPDQWLFLSDWHGSUHVVXUHDWWKHRXWHU FDVLQJVKRHGXULQJDQQXODUGLVSRVDORSHUDWLRQVDQG FDOFXODWLRQVVKRZLQJKRZWKLVYDOXHZDVGHWHUPLQHG 0D[LPXPDQWLFLSDWHGSUHVVXUHDWWKHRXWHUFDVLQJVKRH GXULQJGLVSRVDORSHUDWLRQVLVSVL6HHDWWDFKHG FDOFXODWLRQSDJH 'HWDLOVWKDWVKRZWKHVKRHRIWKHRXWHUFDVLQJLVVHWEHORZWKH EDVHRIDQ\IUHVKZDWHUDTXLIHUDQGSHUPDIURVWLISUHVHQWDQG FHPHQWHGZLWKVXIILFLHQWFHPHQWWRSURYLGH]RQHLVRODWLRQ 6HHDWWDFKHGFHPHQWLQJUHSRUWV/27),7UHSRUWVDQG FDVLQJUHSRUWV 'HWDLOVWKDWVKRZWKHLQQHUDQGRXWHUFDVLQJVWULQJVKDYH VXIILFLHQWVWUHQJWKLQFROODSVHDQGEXUVWWRZLWKVWDQG DQWLFLSDWHGSUHVVXUHRIGLVSRVDORSHUDWLRQV 6HHDWWDFKHGFDVLQJVXPPDU\VKHHWDQGFDOFXODWLRQSDJHV 7KHGRZQKROHSUHVVXUHREWDLQHGGXULQJDIRUPDWLRQLQWHJULW\ WHVWFRQGXFWHGEHORZWKHRXWHUFDVLQJVKRH 6HHDWWDFKHG/27),7UHSRUW ,GHQWLILFDWLRQRIWKHK\GURFDUERQ]RQHVLIDQ\DERYHWKH GHSWKWRZKLFKWKHLQQHUFDVLQJLVFHPHQWHG 7KHWRSRIFHPHQWLV 0'LQWKHLQWHUPHGLDWHFDVLQJ ZKLFKFRYHUVWKHXSSHUPRVWK\GURFDUERQEHDULQJ]RQH1R K\UGURFDUERQEHDULQJ]RQHVKDYHEHHQLGHQWLILHGDERYHWKLV GHSWK 7KHGXUDWLRQRIWKHGLVSRVDORSHUDWLRQQRWWRH[FHHGGD\V1$ :KHWKHUGULOOLQJZDVWHKDVSUHYLRXVO\EHHQGLVSRVHGRILQWKH DQQXODUVSDFHRIWKHZHOODQGLIVRDVXPPDU\RIWKHGDWHVRI WKHGLVSRVDORSHUDWLRQVWKHYROXPHVRIZDVWHGLVSRVHGRI DQGWKHZHOOVZKHUHWKHGULOOLQJZDVWHZDVJHQHUDWHG 1$ 7KHZHOO V ZKHUHWKHGULOOLQJZDVWHWREHGLVSRVHGRIZDVRU ZLOOEHJHQHUDWHG ,IWKHRSHUDWRUSURSRVHVQRWWRFRPSO\ZLWKDOLPLWDWLRQ HVWDEOLVKHGLQ G RIWKLVVHFWLRQDQH[SODQDWLRQRIZK\ FRPSOLDQFHZRXOGEHLPSUXGHQW 1$ $Q\DGGLWLRQDOGDWDUHTXLUHGE\WKHFRPPLVVLRQWRFRQILUP FRQWDLQPHQWRIGULOOLQJZDVWH 1$ $QQXOXV'LVSRVDO7UDQVPLWWDO)RUP:HOO07 07070707 070707 7KHXSSHU&ROYLOOHFRQILQLQJEDUULHUFRQVLVWVRIPHGLXPJUD\ FOD\VWRQHZLWKVRPHVLOWVWRQHOHQVHV7KHSODQQHGGLVSRVDO LQWHUYDORIWKH1DQXVKXN.VDQGFRQVLVWVRIVKDOORZPDULQH VHGLPHQWVSUHGRPLQDQWO\VDQGVWRQHDQGVLOWVWRQHV7KHORZHU FRQILQLQJEDUULHURIWKH7RURNIRUPDWLRQFRQVLVWVPDLQO\RI PDULQHVKDOHZLWKLQWHUEHGGHGVLOWVWRQHDQGVDQGVWRQH &DOFXODWHGZDWHUVDOLQLWLHVLQWKHRYHUO\LQJ&ROYLOOHJURXS UDQJHIURPSSPFDOFXODWHGVDOLQLWLHVLQWKH FRUUHVSRQGLQJ.DQG.LQWHUYDOUDQJHIURP SSPDQGFDOFXODWHGVDOLQLWLHVLQWKHXQGHUO\LQJ7RURN UDQJHIURPSSP 5HI$2*&&&RQVHUYDWLRQ 2UGHU1R$SSHQGL[RI&3$,$SSOLFDWLRQ-XO\   IRUVXEPLWDOZLWK$QQXODU'LVSRVDO$SSOLFDWLRQ 9HUVLRQ-DQ  :HOO 'DWH 0D[LPXPLQMHFWLRQSUHVVXUHRI SVL 0D[LPXPGHQVLW\RIWKHLQMHFWLRQIOXLGLV SSJ 3RUHSUHVVXUHDWWKHFDVLQJVKRHLV SVLIW *DV)OXLG*UDGLHQWLQWXELQJFDVLQJDQQXOXV SVLIW +HDGHU3UHVVXUH IRUZHOOVRQJDVOLIW SVL 0D[LPXP)OXLG'HQVLW\WRDYRLG%XUVWRI6XUIDFH&DVLQJ 3EXUVW 3+\GURVWDWLF3$SSOLHG3)RUPDWLRQ     0:PD[    0:PD[ SSJ  79'6XUIDFH&DVLQJ6WULQJ 6L]H  LQ 72&(VW# 0':HLJKW SSI  79'*UDGH / 6WDJH&ROODU# 0'3EXUVWSVL 3EXUVWSVL 'HSWKRI6KRH IW ),7/27#6KRH SSJ RU SVL ),7/27IRU$QQXOXV SSJ 0D[6XUI3UHVVXUH SVL 72&(VW# 0'  79' 0D[LPXP)OXLG'HQVLW\DYRLG&ROODSVHRIQG&DVLQJ6WULQJ 3FROODSVH 3+\GURVWDWLF3$SSOLHG3*DV*UDGLHQW3+HDGHU     0:PD[     0:PD[ SSJ 7XELQJ QG&DVLQJ6WULQJ 6L]H  LQ 79':HLJKW SSI *UDGH / 3FROODSVHSVL 3FROODSVHSVL 7RSRI&HPHQW IW *DV*UDGLHQW SVLIW 0D[6XUI3UHVVXUH SVL +HDGHU3UHVV SVL 0D[LPXP$QWLFLSDWHG3UHVVXUHDW6XUIDFH&DVLQJ6KRH 3PD[DOORZDEOH 6KRH79''HSWK  6KRH),7/27 3PD[DOORZDEOH    3PD[DOORZDEOH  SVL 7KLVLVWKHYDOXHIRUWKH,QMHFWLRQ3HUPLW0D[LPXP$QWLFLSDWHG3UHVVXUHDW6KRHGLHVHOZDWHU $VVXPSWLRQV    07  3UHVVXUH&DOFXODWLRQVIRU$QQXODU'LVSRVDO  GLHVHOZDWHU&DVLQJ &DVLQJ MT7-03 13-3/8" Surface Casing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ig Supervisors: R. Reinhardt / B.Book ,QWHUPHGLDWHFDVLQJ :HOO07 7-5/8"_29.7#/33.7#_H563/TXP_Int Csg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upervisors: R. Reinhardt / M. Tucker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«  7RS3OXJ" <HV %WP3OXJ" <HV 43XPS,QLW EEOP«  43XPS)LQDO EEO«  43XPS$YJ EEO«  33XPS)LQDO SVL  33OXJ%XPS SVL  5HFLS" <HV 6WURNH IW 5RWDWHG" 1R 3LSH530 USP 7DJJHG'HSWK IW.% 7DJ0HWKRG 'HSWK3OXJ'ULOOHG2XW7R IW.% 'ULOO2XW'LDPHWHU LQ &RPPHQW 6/%SXPSEEOVRIIUHVK+27HVWHGOLQHVWRSVLORZSVLKLJKSXPSEEOVRISSJ0XG3XVK,,#EEOVPLQSVL)2'URSSHG  ERWWRPSOXJ6WDUWEDWFKLQJOHDG3XPSEEOVRISSJ'HHS&5(7(FHPHQWDWEEOVPLQSVL,&3)2%DWFKDQGSXPSEEOVRI*%OHQG  7DLOSSJFHPHQW#EEOVPLQSVL)2'URSWRSSOXJ NLFNRXWZLWKEEOVRIIUHVK+26ZDSWRULJ GLVSODFHZSSJ.VLPXG#  EEOVPLQSVL)2%XPSSOXJZLWKSVL EEOVEEOV VWURNHVILQDOFLUF36,#ESP3UHVVXUHXSWRSVL KROGIRU  PLQXWHV%OHHGRIISUHVVXUH&KHFNIORDWV)ORDWVKROGLQJEEOVSSJFHPHQWWRVXUIDFH &HPHQW)OXLGV $GGLWLYHV )OXLG )OXLG7\SH )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.% (VW%WP IW.% $PRXQW VDFNV &ODVV 9ROXPH3XPSHG EEO <LHOG IWñVDFN 0L[+5DWLR JDOVD«)UHH:DWHU  'HQVLW\ OEJDO 3ODVWLF9LVFRVLW\ F3 7KLFNHQLQJ7LPH KU &PSU6WU SVL $GGLWLYHV $GGLWLYH 7\SH &RQFHQWUDWLRQ &RQF8QLWODEHO 6WULQJ6XUIDFH6WULQJ&HPHQW -RE'5,//,1*25,*,1$/ 3DJH 07 5HSRUW3ULQWHG 7LPH/RJ 6XPPDU\5HSRUW$2*&& -REW\SH'5,//,1*25,*,1$/ 7LPH/RJ 6WDUW7LPH (QG7LPH 'XU KU 6WDUW'HSWK IW.% (QG'HSWK IW.% 3KDVH 2S&RGH $FWLYLW\&RGH 7LPH3 7; 2SHUDWLRQ      387% 3 3LFNXSVKRHWUDFNDQGWHVWIORDWV JRRG 5HPRYHGFROODURQMRLQWWREDNHUORN 7RSKDWSODFHGRQWRSRIIORDWFROODU:LWQHVVHG  E\&23 %DIIOHFROODUSODFHGDIWHUMQWVHWWLQJGHSWKRI   :LWQHVVHGE\&23      387% 3 3LFNXSDQGUXQ/7;3FDVLQJI   W 0'N8S:WN'Q:W  0RQLWRUGLVSODFHPHQWRQSLW (6&HPHQWHUSLFNHGXSDIWHUMQWSLQV  SVL YHULILHGE\+(6DQGZLWQHVVHGE\  &236HWWLQJGHSWK       387% 3 0DNHXSFURVVRYHUMRLQWDQGFRQWLQXHUXQQLQJLQ  WKHZLWK/+<'FDVLQJI   W 0'N8S:WN'Q:W 0RQLWRUGLVSODFHPHQWRQSLW      &,5& 3 6WDJHSXPSVXSWREEOVPLQDQGFLUFXODWH  ERWWRPVXSSVLIORZRXWN8S:W  N'Q:W 2EVHUYHGSSJ0:RXWGXULQJFLUFXODWLRQ      387% 3 &RQWLQXHUXQQLQJLQWKHZLWK/  +<'FDVLQJI W 0'N'Q  :W 0RQLWRUGLVSODFHPHQWRQSLW      387% 3 &RQWLQXHUXQQLQJLQWKHZLWK/  +<'FDVLQJI W 0'N'Q  :W 0RQLWRUGLVSODFHPHQWRQSLW      &,5& 3 6WDJHXSSXPSVWREEOVPLQDQGFLUFXODWHG  ERWWRPVXSZKLOHUHFLSURFDWLQJI W   0'SVLIORZRXWN8S:W  N'Q:W 2EVHUYHGSSJ0:RXWRIWKHKROH      387% 3 &RQWLQXHUXQQLQJLQWKHZLWK/  +<'FDVLQJI W 0'N'Q  :W 0RQLWRUGLVSODFHPHQWRQSLW      &,5& 3 6WDJHXSSXPSVWREEOVPLQDQGFLUFXODWHG  ERWWRPVXSZKLOHVODFNLQJRIII W  0'SVLIORZRXWN8S:WN  'Q:W 2EVHUYHGSSJ0:RXWRIWKHKROH       387% 3 &RQWLQXHUXQQLQJLQWKHZLWK/  +<'FDVLQJI W 0'N  'Q:W 0RQLWRUGLVSODFHPHQWRQSLW %HJDQHDVLQJFDVLQJLQWKHKROHEHWZHHQ  IWKUVWDUWLQJDW 0'      387% 3 &RQWLQXHUXQQLQJLQWKHKROHZLWK/ +<'FDVLQJI W 0'  N'Q:W 0RQLWRUGLVSODFHPHQWRQSLW (DVLQJFDVLQJLQWKHKROHEHWZHHQIWKU      387% 3 &RQWLQXHUXQQLQJLQWKHKROHZLWK/ +<'FDVLQJI W 0'  N'Q:W 0RQLWRUGLVSODFHPHQWRQSLW (DVLQJFDVLQJLQWKHKROHEHWZHHQIWKU 5LJ1DPH'2<21 5LJ$FFHSW 5LJ5HOHDVH :HOO1DPH07 3DJH 07 5HSRUW3ULQWHG 7LPH/RJ 6XPPDU\5HSRUW$2*&& -REW\SH'5,//,1*25,*,1$/ 7LPH/RJ 6WDUW7LPH (QG7LPH 'XU KU 6WDUW'HSWK IW.% (QG'HSWK IW.% 3KDVH 2S&RGH $FWLYLW\&RGH 7LPH3 7; 2SHUDWLRQ      387% 3 &RQWLQXHUXQQLQJLQWKHKROHZLWK/ +<'FDVLQJI W 0' %HJLQDSSO\LQJNWTZKLOHZRUNLQJWKHVWULQJ  GRZQ3LFNLQJXSWRNVODFNLQJRIIWRN $WWHPSWHGWRFLUFXODWHVSPSVLVSP  SVL      387% 7 &RQWLQXHZRUNLQJWKH/+<'  FDVLQJLQWKHKROHI W 0' 3XPSDWVSP,&3SVLSUHVVXUHVORZO\IHOO  WRSVL :RUNLQJVWULQJXSWRNVODFNLQJRIIWRN      387% 7 &RQWLQXHZRUNLQJWKH/+<'  FDVLQJLQWKHKROHI W 0' 3XPSLQJDWVSPSVLSVL      387% 7 $SSO\NWTDQGFRQWLQXHZRUNLQJFDVLQJ  LQWKHKROHI W 0'SLFNLQJXS  WRNDQGVODFNLQJRIIWRNSXPSDWVSP  SVLVSPSVL      387% 7 &RQWLQXHZRUNLQJFDVLQJLQWKHKROHZLWK  NWTI W 0'SLFNLQJXSWR  NDQGVODFNLQJRIIWRNSXPSDWVSP  SVL %HJLQUHGXFLQJ0:WRSSJ      &,5& 3 &LFXODWHERWWRPVXSDWEEOPLQ,&3 SVL  )&3 SVLIORZRXWSSJ0:RXW  RIWKHKROH :RUNLQJSLSHXSWRNDQGVODFNLQJRIIWR  NZLWKNWT      &,5& 3 &RQWLQXHVWDJLQJXSSXPSVWREEOVPLQZKLOH  ZRUNLQJSLSHXSWRNDQGVODFNLQJRIIWR  NZLWKNWTSVLREVHUYHGVLJQVRI  SDFNRIIVORZSXPSUDWHWREEOPLQDQG  UHJDLQHGFLUFXODWLRQ 4XLWZRUNLQJSLSHDQGUHOHDVHWTSUHVVXUHIHOOWR  SVLVWDJHXSSXPSVWREEOVPLQSVL      &,5& 3 &RQWLQXHFLUFXODWLQJURWDWLQJDQGUHFLSURFDWLQJ FDVLQJZLWK*3038XSWRNDQG  WRUTXHNIWOEV(QFRXQWHUHGSDFNRIIDW  *305HJDLQHGFLUFXODWLRQDQGFRQWLQXHG  VWDJLQJXSSXPSV      &,5& 3 &RQWLQXHFLUFXODWLQJURWDWLQJDQGUHFLSURFDWLQJ FDVLQJZLWK*3038XSWRNDQG  WRUTXHNIWOEV(QFRXQWHUHGSDFNRIIVZRUNHG  WKURXJKDQGFRQWLQXHGVWDJLQJXSSXPSV      &,5& 3 &RQWLQXHFLUFXODWLQJURWDWLQJDQGUHFLSURFDWLQJ FDVLQJZLWK*3038XSWRNDQG  WRUTXHNIWOEV(QFRXQWHUHGSDFNRIIVZRUNHG  WKURXJKDQGFRQWLQXHGVWDJLQJXSSXPSV      585' 3 %ORZGRZQWRSGULYHDQGULJXSFHPHQWOLQH      &,5& 3 &RQWLQXHFLUFXODWLQJDQGUHFLSURFDWLQJ  FDVLQJZLWK*3038XSWRNVWDJH  SXPSVWRJSPSVL  6ODFNRIIWRVHWGHSWKNKRRNORDG      &017 3 6/%SXPSEEOVRIIUHVK+27HVWHGOLQHVWR  SVLORZSVLKLJKSXPSEEOVRI  SSJ0XG3XVK,,#EEOVPLQSVL  'URSSHGERWWRP E\SDVV SOXJ FHPHQWZHW#   %HJLQSXPSLQJSSJ&ODVV*FHPHQW  #ESPSVL 5LJ1DPH'2<21 5LJ$FFHSW 5LJ5HOHDVH :HOO1DPH07 3DJH 07 5HSRUW3ULQWHG 7LPH/RJ 6XPPDU\5HSRUW$2*&& -REW\SH'5,//,1*25,*,1$/ 7LPH/RJ 6WDUW7LPH (QG7LPH 'XU KU 6WDUW'HSWK IW.% (QG'HSWK IW.% 3KDVH 2S&RGH $FWLYLW\&RGH 7LPH3 7; 2SHUDWLRQ      &017 3 &RQWLQXHSXPSLQJWRWDORIEEOVRI&ODVV*  SSJFHPHQW#EEOVPLQ,&3 SVL  )&3 SVL'URSWRS VKXWRII SOXJ NLFN  RXWZLWKEEOVRIIUHVK+26ZDSWRULJ  GLVSODFHZSSJ/61'PXG#EEOVPLQ  SVL6ORZSXPSVWRESPDWVWNVDW  VWNVREVHUYHGSUHVVXUHEXLOGWRSVL  VKXWGRZQSXPSVDQGZRUNSLSHFRQWLQXH  GLVSODFLQJFHPHQWDWWRESPSOXJEXPSDW  VWNV EEOVEEOV EEOV ORVW  EEOVRIFHPHQWGXULQJGLVSODFHPHQW  )&3 SVL&,3KUV%OHG  SUHVVXUHDQGFKHFNHGIORDWV JRRG      &,5& 3 3UHVVXUHXSRQFDVLQJWRRSHQWKHFHPHQWVWDJH  FROODUREVHUYHRSHQDWSVL&LUFXODWHDQG  FRQGLWLRQPXGIRUVHFRQGVWDJHFHPHQWMRE  JSPSVL      &017 3 6/%SXPSEEOVRISSJ0XG3XVK,,#  EEOVPLQSVL%DWFKFHPHQW FHPHQW  ZHW# 3XPSEEOVRISSJ&ODVV  *FHPHQW#ESPSVL'URSFORVLQJSOXJ  NLFNRXWZLWKEEOVRIIUHVK+26ZDSWRULJ  GLVSODFHZSSJ/61'PXG#EEOVPLQ  SVL6ORZSXPSVWRESPDWVWNVSOXJ  EXPSDWVWNV EEOVEEOV   EEOV )&3 SVL&,3KUV  ,QFUHDVHSUHVVXUHWRSVLDQGFORVHWKH  FHPHQWVWDJHFROODU%OHGRIISUHVVXUHDQG  FKHFNHGIRUIORZ VWDWLF       2:)) 3 2EVHUYHGZHOOIRUIORZIRUPLQEORZGRZQ  FHPHQWOLQHVDQGULJGRZQOD\GRZQ9RODQWWRRO      :2& 3 :DLWRQFHPHQWWRUHDFKSVLFRPSUHVVLYH  VWUHQJWK 6HUYLFHWKHWRSGULYHFOHDQRXWFHPHQWOLQH  YDOYHVFKDQJHPXGSXPSOLQHUVWR      :2& 3 &RQWLQXHZDLWLQJRQFHPHQWWRUHDFKSVL  FRPSUHVVLYHVWUHQJWK /D\GRZQVWDQGVRI+:'3DQGVWDQGVRI  '3      :2& 3 &RQWLQXHZDLWLQJRQFHPHQWWRUHDFKSVL  FRPSUHVVLYHVWUHQJWK  6LPRSVFRQWLQXHOD\LQJGRZQ'3SUHSDUH  IRUVSOLWWLQJWKHVWDFN      181' 3 ,QVWDOOHGIWSXSMRLQWRQWRSRIWKHFDVLQJ  SLFNHGXSWRIWRQMRLQWUHPRYHGWKH36  VWULSQLSSOHDQG03'FODPS6SOLWVWDFN  EHWZHHQFDVLQJDQGWXELQJVSRROUHPRYHGVWXGV  IURPWXELQJVSRROIRUFOHDUDQFH      ::63 3 ,QVWDOOHGHPHUJHQF\VOLSVVODFNRIDQGKDQJ  FDVLQJNKRRNORDG,QVWDOOHG:DFKVFDVLQJ  FXWWHUFXWIWRIIWKHWRSRIMRLQWDQG  GUHVVHGIRUSDFNRII 6LPRSVFKDQJHGXSSHUUDPVWR[  9%5 V      181' 3 ,QVWDOOHGVWXGVRQWXELQJVSRRODQGQLSSOHXS  VWDFN ,QVWDOOHGWKH2UELWYDOYH5&'FODPSDQGWKHWULS  QLSSOH      ::63 3 ,QVWDOOSDFNRIIZLWKVWDQGRI'3UXQLQORFN  GRZQVUHZVWHVWSDFNRIIWRSVLIRUPLQ  JRRGWHVW 3XOOSDFNRIIUXQQLQJWRROVHWWHVW  SOXJ      27+5 3 &KDQJHGWKHVDYHUVXERQWKHWRSGULYHWR;7 5LJ1DPH'2<21 5LJ$FFHSW 5LJ5HOHDVH :HOO1DPH07 3DJH 07 5HSRUW3ULQWHG &HPHQW'HWDLO5HSRUW &HPHQW'HWDLOV 'HVFULSWLRQ ,QWHUPHGLDWH6WULQJ&HPHQW &HPHQWLQJ6WDUW'DWH  &HPHQWLQJ(QG'DWH  :HOOERUH1DPH 07 &RPPHQW 6/%SXPSEEOVRIIUHVK+27HVWHGOLQHVWRSVLORZSVLKLJKSXPSEEOVRISSJ0XG3XVK,,#EEOVPLQSVL'URSSHGERWWRP  E\SDVV SOXJ FHPHQWZHW# 3XPSEEOVSSJ&ODVV*FHPHQW#ESPSVL)&3 SVL'URSWRS VKXWRII SOXJ NLFNRXWZLWK  EEOVRIIUHVK+26ZDSWRULJ GLVSODFHZSSJ/61'PXG#EEOVPLQSVL6ORZSXPSVWRESPDWVWNVDWVWNVREVHUYHGSUHVVXUH  EXLOGWRSVLVKXWGRZQSXPSVDQGZRUNSLSHFRQWLQXHGLVSODFLQJFHPHQWDWWRESPSOXJEXPSDWVWNV EEOVEEOV EEOV ORVW  EEOVRIFHPHQWGXULQJGLVSODFHPHQW)&3 SVL&,3KUV%OHGSUHVVXUHDQGFKHFNHGIORDWV JRRG 6/%SXPSEEOVRISSJ0XG3XVK,,#EEOVPLQSVL%DWFKFHPHQW FHPHQWZHW# 3XPSEEOVRISSJ&ODVV*FHPHQW#  ESPSVL'URSFORVLQJSOXJ NLFNRXWZLWKEEOVRIIUHVK+26ZDSWRULJ GLVSODFHZSSJ/61'PXG#EEOVPLQSVL6ORZSXPSVWR  ESPDWVWNVSOXJEXPSDWVWNV EEOVEEOV EEOV )&3 SVL&,3KUV,QFUHDVHSUHVVXUHWRSVLDQGFORVHWKH  FHPHQWVWDJHFROODU%OHGRIISUHVVXUHDQGFKHFNHGIRUIORZ VWDWLF  &HPHQW6WDJHV 6WDJH6WDJH1XPEHU"! 'HVFULSWLRQ 2EMHFWLYH 7RS'HSWK IW.% %RWWRP'HSWK IW.% )XOO5HWXUQ"9RO&HPHQW«7RS3OXJ" %WP3OXJ" 43XPS,QLW EEOP« 43XPS)LQDO EEO« 43XPS$YJ EEO«33XPS)LQDO SVL 33OXJ%XPS SVL 5HFLS" 6WURNH IW 5RWDWHG" 3LSH530 USP 7DJJHG'HSWK IW.% 7DJ0HWKRG 'HSWK3OXJ'ULOOHG2XW7R IW.% 'ULOO2XW'LDPHWHU LQ &RPPHQW &HPHQW)OXLGV $GGLWLYHV )OXLG )OXLG7\SH )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.% (VW%WP IW.% $PRXQW VDFNV &ODVV 9ROXPH3XPSHG EEO <LHOG IWñVDFN 0L[+5DWLR JDOVD«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ŽƐƚϯϮƉƐŝĚƵƌŝŶŐƚĞƐƚ͕ŚĞůĚϵϵ͘ϭйŽĨƚĞƐƚƉƌĞƐƐƵƌĞ͘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ŽƐƚϭϱƉƐŝĚƵƌŝŶŐƚĞƐƚ͕ŚĞůĚϵϵ͘ϲйŽĨƚĞƐƚƉƌĞƐƐƵƌĞ͘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ŽƐƚϯϭƉƐŝĚƵƌŝŶŐƚĞƐƚ͕ŚĞůĚϵϵ͘ϭйŽĨƚĞƐƚƉƌĞƐƐƵƌĞ͘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ŽƐƚϱϬƉƐŝĚƵƌŝŶŐƚĞƐƚ͕ŚĞůĚϵϴ͘ϲйŽĨƚĞƐƚƉƌĞƐƐƵƌĞ͘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ŽƐƚϮϱƉƐŝĚƵƌŝŶŐƚĞƐƚ͕ŚĞůĚϵϵ͘ϰйŽĨƚĞƐƚƉƌĞƐƐƵƌĞ͘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ŽƐƚϱϭƉƐŝĚƵƌŝŶŐƚĞƐƚ͕ŚĞůĚϵϴ͘ϲйŽĨƚĞƐƚƉƌĞƐƐƵƌĞ͘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ŽƐƚϮϬƉƐŝĚƵƌŝŶŐƚĞƐƚ͕ŚĞůĚϵϵ͘ϰйŽĨƚĞƐƚƉƌĞƐƐƵƌĞ͘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«  7RS3OXJ" <HV %WP3OXJ" <HV 43XPS,QLW EEOP«  43XPS)LQDO EEO«  43XPS$YJ EEO«  33XPS)LQDO SVL  33OXJ%XPS SVL  5HFLS" <HV 6WURNH IW  5RWDWHG" 1R 3LSH530 USP 7DJJHG'HSWK IW.% 7DJ0HWKRG 'HSWK3OXJ'ULOOHG2XW7R IW.% 'ULOO2XW'LDPHWHU LQ &RPPHQW EEOVFHPHQWUHWXUQHGWRVXUIDFH &HPHQW)OXLGV $GGLWLYHV )OXLG )OXLG7\SH /HDG&HPHQW )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.%  (VW%WP IW.%  $PRXQW VDFNV  &ODVV %OHQG 9ROXPH3XPSHG EEO  <LHOG IWñVDFN  0L[+5DWLR JDOVD«  )UHH:DWHU  'HQVLW\ OEJDO  3ODVWLF9LVFRVLW\ F3  7KLFNHQLQJ7LPH KU &PSU6WU SVL $GGLWLYHV $GGLWLYH 7\SH &RQFHQWUDWLRQ &RQF8QLWODEHO )OXLG )OXLG7\SH 7DLO&HPHQW )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.%  (VW%WP IW.%  $PRXQW VDFNV  &ODVV * 9ROXPH3XPSHG EEO  <LHOG IWñVDFN  0L[+5DWLR JDOVD«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«7RS3OXJ" <HV %WP3OXJ" <HV 43XPS,QLW EEOP«  43XPS)LQDO EEO«  43XPS$YJ EEO«  33XPS)LQDO SVL  33OXJ%XPS SVL 5HFLS" 1R 6WURNH IW 5RWDWHG" 1R 3LSH530 USP 7DJJHG'HSWK IW.% 7DJ0HWKRG 'HSWK3OXJ'ULOOHG2XW7R IW.% 'ULOO2XW'LDPHWHU LQ &RPPHQW 3XPSHGEEOVFODVV*SSJFHPHQW2EVHUYHGSDFNRIIVDQGORVWEEOVDIWHUFHPHQWH[LWHGWKHVKRH FDOFXODWHGVWURNHV  &HPHQW)OXLGV $GGLWLYHV )OXLG )OXLG7\SH ,QWHUPHGLDWH&HPHQW )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.%  (VW%WP IW.%  $PRXQW VDFNV  &ODVV * 9ROXPH3XPSHG EEO  <LHOG IWñVDFN  0L[+5DWLR JDOVD«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«  7RS3OXJ" <HV %WP3OXJ" <HV 43XPS,QLW EEOP«  43XPS)LQDO EEO«  43XPS$YJ EEO«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ñVDFN  0L[+5DWLR JDOVD«  )UHH:DWHU  'HQVLW\ OEJDO  3ODVWLF9LVFRVLW\ F3  7KLFNHQLQJ7LPH KU &PSU6WU SVL $GGLWLYHV $GGLWLYH 7\SH &RQFHQWUDWLRQ &RQF8QLWODEHO )OXLG )OXLG7\SH 7DLO&HPHQW )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.%  (VW%WP IW.%  $PRXQW VDFNV  &ODVV * 9ROXPH3XPSHG EEO  <LHOG IWñVDFN  0L[+5DWLR JDOVD«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«  7RS3OXJ" <HV %WP3OXJ" <HV 43XPS,QLW EEOP«  43XPS)LQDO EEO«  43XPS$YJ EEO«  33XPS)LQDO SVL  33OXJ%XPS SVL  5HFLS" 1R 6WURNH IW 5RWDWHG" 1R 3LSH530 USP 7DJJHG'HSWK IW.% 7DJ0HWKRG 'HSWK3OXJ'ULOOHG2XW7R IW.% 'ULOO2XW'LDPHWHU LQ &RPPHQW ,QMHFWHGEEOVFODVV*SSJFHPHQW &HPHQW)OXLGV $GGLWLYHV )OXLG )OXLG7\SH )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.% (VW%WP IW.% $PRXQW VDFNV &ODVV 9ROXPH3XPSHG EEO <LHOG IWñVDFN 0L[+5DWLR JDOVD«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«7RS3OXJ" %WP3OXJ" 43XPS,QLW EEOP« 43XPS)LQDO EEO« 43XPS$YJ EEO«33XPS)LQDO SVL 33OXJ%XPS SVL 5HFLS" 6WURNH IW 5RWDWHG" 3LSH530 USP 7DJJHG'HSWK IW.% 7DJ0HWKRG 'HSWK3OXJ'ULOOHG2XW7R IW.% 'ULOO2XW'LDPHWHU LQ &RPPHQW &HPHQW)OXLGV $GGLWLYHV )OXLG )OXLG7\SH )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.% (VW%WP IW.% $PRXQW VDFNV &ODVV 9ROXPH3XPSHG EEO <LHOG IWñVDFN 0L[+5DWLR JDOVD«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«  7RS3OXJ" <HV %WP3OXJ" <HV 43XPS,QLW EEOP«  43XPS)LQDO EEO«  43XPS$YJ EEO«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ñVDFN  0L[+5DWLR JDOVD«  )UHH:DWHU  'HQVLW\ OEJDO  3ODVWLF9LVFRVLW\ F3  7KLFNHQLQJ7LPH KU  &PSU6WU SVL $GGLWLYHV $GGLWLYH 7\SH &RQFHQWUDWLRQ &RQF8QLWODEHO )OXLG )OXLG7\SH 7DLO&HPHQW )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.%  (VW%WP IW.%  $PRXQW VDFNV  &ODVV * 9ROXPH3XPSHG EEO  <LHOG IWñVDFN  0L[+5DWLR JDOVD«  )UHH:DWHU  'HQVLW\ OEJDO  3ODVWLF9LVFRVLW\ F3  7KLFNHQLQJ7LPH KU  &PSU6WU SVL $GGLWLYHV $GGLWLYH 7\SH &RQFHQWUDWLRQ &RQF8QLWODEHO 6WDJH 'HVFULSWLRQ 3ULPDU\±)XOO%RUH 2EMHFWLYH &HPHQW[ &DVLQJLQSODFH 7RS'HSWK IW.% %RWWRP'HSWK IW.%  )XOO5HWXUQ" <HV 9RO&HPHQW«  7RS3OXJ" <HV %WP3OXJ" <HV 43XPS,QLW EEOP«  43XPS)LQDO EEO«  43XPS$YJ EEO«  33XPS)LQDO SVL  33OXJ%XPS SVL  5HFLS" 1R 6WURNH IW 5RWDWHG" 1R 3LSH530 USP 7DJJHG'HSWK IW.% 7DJ0HWKRG 'HSWK3OXJ'ULOOHG2XW7R IW.% 'ULOO2XW'LDPHWHU LQ &RPPHQW 6/%SXPSEEOVIUHVKZDWHUWRSULPHOLQHV 37OLQHVWRSVL 3XPSEEO¶V0XGSXVK,, 'URSERWWRPSOXJ 6/%ZLOOSXPSEEO¶VSSJ*EOHQGWDLOFHPHQW 'URSWRSSOXJ 6/%ZLOOSXPSEEO¶V+2RQWRSRISOXJ 'LVSODFHFHPHQWZLWKULJDWESPUDWHZLWK/61'6ORZWRESPVWURNHVSULRUWREXPSLQJSOXJ EEO¶VRI/61'ZLOOEHSXPSHGWREXPSSOXJ6WURNHVWREXPS0D[VWURNHV %XPSSOXJSUHVVXUHXSSVLRYHUGLVSODFHPHQWSUHVVXUH %OHHGRIISUHVVXUHFKHFNWRYHULI\IORDWVKROG  &HPHQWLQSODFHDVRIKU &HPHQW)OXLGV $GGLWLYHV )OXLG )OXLG7\SH ,QWHUPHGLDWH&HPHQW )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.% (VW%WP IW.%  $PRXQW VDFNV &ODVV * 9ROXPH3XPSHG EEO  <LHOG IWñVDFN  0L[+5DWLR JDOVD«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¶V0XGSXVK,, 'URSERWWRPSOXJ 6/%ZLOOSXPSEEO¶VSSJ*EOHQGWDLOFHPHQW 'URSWRSSOXJ 6/%ZLOOSXPSEEO¶V+2RQWRSRISOXJ 'LVSODFHFHPHQWZLWKULJDWESPUDWHZLWK/61'6ORZWRESPVWURNHVSULRUWREXPSLQJSOXJ EEO¶VRI/61'ZLOOEHSXPSHGWREXPSSOXJ6WURNHVWREXPS0D[VWURNHV %XPSSOXJSUHVVXUHXSSVLRYHUGLVSODFHPHQWSUHVVXUH %OHHGRIISUHVVXUHFKHFNWRYHULI\IORDWVKHOG  &HPHQWLQSODFHDVRIKU &HPHQW6WDJHV 6WDJH 'HVFULSWLRQ ,QWHUPHGLDWH6WULQJ  &HPHQW 2EMHFWLYH 7RS'HSWK IW.%  %RWWRP'HSWK IW.%  )XOO5HWXUQ" 1R 9RO&HPHQW«  7RS3OXJ" <HV %WP3OXJ" <HV 43XPS,QLW EEOP«  43XPS)LQDO EEO«  43XPS$YJ EEO«  33XPS)LQDO SVL  33OXJ%XPS SVL  5HFLS" 1R 6WURNH IW 5RWDWHG" 1R 3LSH530 USP 7DJJHG'HSWK IW.% 7DJ0HWKRG 'HSWK3OXJ'ULOOHG2XW7R IW.% 'ULOO2XW'LDPHWHU LQ &RPPHQW 6/%SXPSEEOVIUHVKZDWHUWRSULPHOLQHV 37OLQHVWRSVL 3XPSEEO¶V0XGSXVK,, 'URSERWWRPSOXJ 6/%ZLOOSXPSEEO¶VSSJ*EOHQGWDLOFHPHQW 'URSWRSSOXJ 6/%ZLOOSXPSEEO¶V+2RQWRSRISOXJ 'LVSODFHFHPHQWZLWKULJDWESPUDWHZLWK/61'6ORZWRESPVWURNHVSULRUWREXPSLQJSOXJ EEO¶VRI/61'ZLOOEHSXPSHGWREXPSSOXJ6WURNHVWREXPS0D[VWURNHV %XPSSOXJSUHVVXUHXSSVLRYHUGLVSODFHPHQWSUHVVXUH %OHHGRIISUHVVXUHFKHFNWRYHULI\IORDWVKHOG  &HPHQWLQSODFHDVRIKU &HPHQW)OXLGV $GGLWLYHV )OXLG )OXLG7\SH ,QWHUPHGLDWH&HPHQW )OXLG'HVFULSWLRQ (VWLPDWHG7RS IW.%  (VW%WP IW.%  $PRXQW VDFNV  &ODVV * 9ROXPH3XPSHG EEO  <LHOG IWñVDFN  0L[+5DWLR JDOVD«  )UHH:DWHU  'HQVLW\ OEJDO  3ODVWLF9LVFRVLW\ F3 7KLFNHQLQJ7LPH KU  &PSU6WU SVL $GGLWLYHV $GGLWLYH 7\SH &RQFHQWUDWLRQ &RQF8QLWODEHO 6WULQJ,QWHUPHGLDWH6WULQJ&HPHQW -RE'5,//,1*25,*,1$/ Note to File MT7-03 (PTD 2210240, Sundry 322-025) Disposal to Nanushuk K-3 Sand ConocoPhillips Alaska, Inc ConocoPhillips has made application to authorize annular disposal in the subject well. This document examines the pertinent information for the well and recommends approval of ConocoPhillips’ request. -- No unusual events were reported while drilling the surface hole of the well (MT7-03). -- 13-3/8” Surface casing was cemented to surface successfully 6/10/2021 with no losses experienced. Cement report put excess cement to surface of 175 bbls with 483 bbl of 11 ppg DeepCRETE and 72 bbl 15.8 ppg Class G cement pumped. No problems reported. -- On the initial Formation Integrity Test (FIT) for the surface casing shoe dated 6/12/2021, the pressure slope rises smoothly with CPAI determined breakover of 1337 psi equating to a EMW at shoe (3062 ft TVD) of 18.0 ppg. The pressure continued to rise slightly during the remainder of the test. The pressure declined slightly from 1421 to 1017 psi (15.99 ppg EMW) during the 10 minute shut in period with 3.00 bbl being bled back. The initial FIT indicates that the surface casing shoe is well cemented. An open hole injectivity test was completed on 6/30/2021 prior to running and cementing the 7.625” casing with a depth of the casing shoe of 3523 ft MD/ 3057 ft TVD and an open hole to est 7927 ft MD yielding a 15.6 ppg EMW (as calculated at shoe). The test showed pressure rising steadily with the slight tangent change at the 15.6 ppg EMW and a sharp break over point at approximately 15.76 ppg EMW. -- The 7.625” casing was run and successfully cemented with a two stage job and shoe of 11,624 ft. First stage cement was pumped and was estimated as 11,624 to TOC 11050 ft MD. Cement tool at 8756 ft was opened and the 2 nd stage pumped without problems with that TOC estimated at 7400 ft MD. A “SonicScope Top of Cement” evaluation log (emailed 7/3/2021) was run and both stages were analyzed for both pumping statistics and actual log readings. --There are multiple wells currently drilled or planned to be drilled within ¼ mile radius of MT7- 03 and the CPAI application contains supporting cementing and LOT well information and mentions which well and cementing information is already on file with AOGCC. The surface shoe of MT7-05 is closest, about 176’ distant. AD is planned to be prolific on MT7 and CPAI is keeping accurate records for annular disposal for additional MT7 wells. CPAI is therefore constructing the MT7 wells to be compliant with AD regulations. Examination of the cementing information and LOT data did not reveal anything to preclude granting CPAI’s request. Based on examination of the submitted information, I recommend approval of ConocoPhillips’ request for the subject well. Chris Wallace Sr. Petroleum Engineer AOGCC January 24, 2022 TTT RR AA NN SS MM II TT TT AA LL FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 330 W. 7 th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: MT7-03 DATE: 11/01/2021 Transmitted: NPRA, Greater Moose’s Tooth Via SFTP ____ Geolog Mud log data package MT7-03 is in a federal oil and gas unit. Only with respect to the MT7-03 Well Data, CPAI hereby waives its rights to indefinitely confidentiality, under 5 U.S.C. 552(b)(4) and (9). Nothing in this communication should be construed as a waiver of indefinite confidentiality on any other wells. Please note that for the wells not on state land, a state agency should seek consent from the landowner prior to the release of well data by the state agency. See, e.g., AS43.55.025(f)(2)(C)(i). Here, the landowner is the Bureau of Land Management (BLM) and/or Arctic Slope Regional Corporation (ASRC). Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com CC: MT7-03 e-transmittal well folder Receipt: Date: Alaska Data Support|ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512 37' (6HW | 11/09/2021 By Abby Bell at 4:17 pm, Nov 09, 2021 10/27/2021 o?dl- 62q I -7-250 RECEIVED 4015 17 2021 SAMPLE TRANSMITTAL AA (�(��'+ TO: AOGCC DATE: AUGUST 17,202-0`�'CC1 333 WEST 7TH SUITE 100 AIR BILL: N/A ANCH. AK. 99501 CPAI: 2021081702 279-1433 CHARGE CODE: N/A OPERATOR: CPAI NAME: MT7-03 SAMPLE TYPE: Dry Cuttings NUMBER OF BOXES: 6 Box SAMPLES SENT: MT7-03 250-21050 6 Boxes SENT BY: M. McCRACKEN UPON RECEIPT OF THESE SAMPLES. PLEASE NOTE ANY DISCREPANCIES AND RETURN A SIGNED COPY �7�i:IFy3i1N7 l0f f, CONOCOPHILLIPS, ALASKA 700 G ST ATO-380 ANCHORAGE, AK. 99510 ATTN:MIKE McCRACKEN Miike.mccrackeen@cfo�nocophillips.com RECEIVED: 1a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: ____________________ Service Stratigraphic Test 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: 9. Ref Elevations: KB: 17. Field / Pool(s): GL:100.8 BF: Total Depth: 4750' FSL, 3754' FWL S36 T10N R1E UM 10. Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y- Zone- 4 TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y- Zone- 4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 N/A (ft MSL) 22. Logs Obtained: GR, RES, PWD, DIR, AZI, DEN, NEU, CALIPER, POROSITY, ACOUSTIC, NMR, NBI, SONIC, Mud 23. BOTTOM 20" H-40 120 10 yrds 13.375" L-80 3056' 7.625" L-80 8304' 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MCF: Test Period Casing Press:Calculated Gas-MCF:Oil Gravity - API (corr): Press. 24-Hour Rate 1865' FSL, 2828' FWL, S6 T9N R2E UM Sr Res EngSr Pet GeoSr Pet Eng Greater Mooses Tooth/Rendevous Pool 1889'MD/1854'TVD Oil-Bbl:Water-Bbl: Perfed tubing: 11786'-12376' MD/8340'-8405'TVD Gas-Oil Ratio:Choke Size:Water-Bbl: Flow Tubing Injector - Not Pre-Produced Date of Test: Oil-Bbl: Per 20 AAC 25.283 (i)(2) attach electronic information 29.7 37.1 PACKER SET (MD/TVD) TUBING RECORD 11"37.1 11624' GRADE PRODUCTION TEST HOLE SIZE ACID, FRACTURE, CEMENT SQUEEZE, ETC. If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): Lead: 483 bbls of 11ppg DeepCRETE Tail: 72bbls of 15.8ppg Class G 175bbls 11.0ppg cement CEMENTING RECORD 140.7 281520 TOP SETTING DEPTH MD 39.8 39.8 5911527 5919812 94 CASING, LINER AND CEMENTING RECORD 978'MD/977'TVD SETTING DEPTH TVD TOP N/A 68 120' P.O. Box 100360, Anchorage, AK 99510-0360 5915818 CASING WT. PER FT. 289990 Top of Productive Interval: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, 7/11/2021 50-103-20830-00-00 285637 GMTU MT7-03 AA081800, AA081781, AA081803 996' FSL, 1912' FWL, S32 T10N R2E UM 932525000, 932516000. 932538000 6/6/2021 21050'MD/8176'TVD N/A STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ConocoPhillips Alaska, Inc. WAG Gas 7/17/2021 221-024 12376'4.5' SIZE DEPTH SET (MD) 11473' MD/8263' TVD 39.8 3523' AMOUNT PULLED 16" 42" BOTTOM 112.3bbls of 15.8 Class G 39.8 WINJ SPLUGOther Abandoned Suspended Stratigraphic Test No No (attached) No Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment By Meredith Guhl at 11:19 am, Aug 16, 2021 Completion Date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a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: ____________________ Service Stratigraphic Test 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: 9. Ref Elevations: KB: 17. Field / Pool(s): GL:100.8 BF: Total Depth: 4750' FSL, 3754' FWL S36 T10N R1E UM 10. Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y- Zone- 4 TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y- Zone- 4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 N/A (ft MSL) 22. Logs Obtained: GR, RES, PWD, DIR, AZI, DEN, NEU, CALIPER, POROSITY, ACOUSTIC, NMR, NBI, SONIC, Mud 23. BOTTOM 20" H-40 120 10 yrds 13.375" L-80 3056' 7.625" L-80 8304' 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MCF: Test Period Casing Press:Calculated Gas-MCF:Oil Gravity - API (corr): Press. 24-Hour Rate 39.8 3523' AMOUNT PULLED 16" 42" BOTTOM 112.3bbls of 15.8 Class G 39.8 12376'4.5' SIZE DEPTH SET (MD) 11473' MD/8263' TVD STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ConocoPhillips Alaska, Inc. WAG Gas 7/17/2021 221-024 50-103-20830-00-00 285637 GMTU MT7-03 AA081800, AA081781, AA081803 996' FSL, 1912' FWL, S32 T10N R2E UM 932525000, 932516000. 932538000 6/6/2021 21050'MD/8176'TVD N/A P.O. Box 100360, Anchorage, AK 99510-0360 5915818 CASING WT. PER FT. 289990 Top of Productive Interval: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, 7/11/2021 978'MD/977'TVD SETTING DEPTH TVD TOP N/A 68 120' 39.9 281520 TOP SETTING DEPTH MD 39.8 39.8 5911527 5919812 94 CASING, LINER AND CEMENTING RECORD 37.1 11624' GRADE PRODUCTION TEST HOLE SIZE ACID, FRACTURE, CEMENT SQUEEZE, ETC. If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): Lead: 483 bbls of 11ppg DeepCRETE Tail: 72bbls of 15.8ppg Class G 175bbls 11.0ppg cement CEMENTING RECORD Injector - Not Pre-Produced Date of Test: Oil-Bbl: Per 20 AAC 25.283 (i)(2) attach electronic information 29.7 37.1 PACKER SET (MD/TVD) TUBING RECORD 11" Flow Tubing Perfed tubing: 11786'-12376' MD/8340'-8405'TVD Gas-Oil Ratio:Choke Size:Water-Bbl: 1865' FSL, 2828' FWL, S6 T9N R2E UM Sr Res EngSr Pet GeoSr Pet Eng Greater Mooses Tooth/Rendevous Pool 1889'MD/1854'TVD Oil-Bbl:Water-Bbl: WINJ SPLUGOther Abandoned Suspended Stratigraphic Test No No (attached) No Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment By Samantha Carlisle at 9:35 am, Aug 12, 2021 Superseded Conventional Core(s): Yes No Sidewall Cores: N/A 30. MD TVD Surface Surface 978 977 C40 1407 1400 1667 1649 2045 1993 3439 3003 4354 3616 4633 3807 HRZ 9937 7459 N/A 10027 7521 LCU/Miluveach 10203 7640 Top of Productive Interval (Alpine C):11768 8337' Formation at total depth (TD):21050 8176 31. List of Attachments: 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Brad Gorham Contact Email:brad.gorham@conocophillips.com Authorized Contact Phone:907-265-6487 General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. Yes No Well tested? Yes No 28. CORE DATA If yes, list intervals and formations tested, briefly summarizing test results. Attach separate pages to this form, if needed, and submit detailed test information, including reports, per 20 AAC 25.071. NAME Permafrost - Top Permafrost - Base 29. GEOLOGIC MARKERS (List all formations and markers encountered): FORMATION TESTS Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment, whichever occurs first. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. C30 Albian 97 Kalubik C10 K-3 INSTRUCTIONS Authorized Name: Authorized Title: Signature w/Date: Jenna Taylor Wells Engineering Technician Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Albian 96 The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. TPI (Top of Producing Interval). No NoSidewall Cores: Yes No Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment Digitally signed by 4b05089e-b090-4fb0-9bb3-410505d45d8a DN: CN=4b05089e-b090-4fb0-9bb3-410505d45d8a Reason: I am the author of this document Location: your signing location here Date: 2021.08.12 08:34:35-08'00' Foxit PhantomPDF Version: 10.1.3 Superseded Last Tag Annotation Depth (ftKB) End Date Wellbore Last Mod By LAST TAG:MT7-03 jennalt Last Rev Reason Annotation End Date Wellbore Last Mod By REV REASON: NEW WELL MT7-03 jennalt Casing Strings Casing Description CONDUCTOR OD (in) 20 ID (in) 19.12 Top (ftKB) 39.8 Set Depth (ftKB) 120.0 Set Depth (TVD) (… 120.0 Wt/Len (l… 94.00 Grade Top Thread Casing Description SURFACE OD (in) 13 3/8 ID (in) 12.42 Top (ftKB) 39.8 Set Depth (ftKB) 3,523.4 Set Depth (TVD) (… 3,056.9 Wt/Len (l… 68.00 Grade L-80 Top Thread H563 Casing Description INTERMEDIATE OD (in) 7 5/8 ID (in) 6.88 Top (ftKB) 37.1 Set Depth (ftKB) 11,624.1 Set Depth (TVD) (… 8,304.1 Wt/Len (l… 29.70 Grade L80 Top Thread Hyd563 Tubing Strings Tubing Description TUBING PRODUCTION String Max … 4 1/2 ID (in) 3.96 Top (ftKB) 34.3 Set Depth (ft… 12,375.9 Set Depth (TVD) (ft… 8,405.2 Wt (lb/ft) 12.60 Grade L-80 Top Connection Hyd563 Completion Details Top (ftKB) Top (TVD) (ftKB)Top Incl (°)Item Des Com Nominal ID (in) 34.3 34.3 0.00 HANGER FMC 4-1/2" Tubing Hanger Hydril HYD 563 Min ID 3.92" 3.958 1,865.1 1,832.5 24.34 NIPPLE NIPPLE,LANDING,4 1/2","X",3.813", H563 3.813 1,927.6 1,889.2 25.87 INJ 4-1/2" x 1" Camco VanOil KBMG GLM w/ DV, 12.6# H563 BK Latch 3.865 11,338.5 8,219.6 69.61 INJ 4-1/2" x 1" Camco VanOil KBMG GLM w/ DV, 12.6# H563 BK Latch 3.865 11,448.9 8,255.8 72.15 GAUGE/PUMP SENSOR Halliburton Opsis Mandrel w/ Downhole guage 3.898 11,473.1 8,263.1 72.67 PACKER Baker Premier Production Packer, 4 1/2" X 7 5/8" 33.7# 3.880 11,542.2 8,282.8 74.14 NIPPLE NIPPLE,LANDING,4 1/2","DB-6",3.75", H563 3.750 11,605.3 8,299.4 75.42 SLIDING SLEEVE Baker Frac Sleeve, H563 3.688 12,375.4 8,405.2 86.92 SHOE NS aluminum Millable shoe, 4-1/2" TXP 3.958 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Des Com Run Date ID (in) SN 35.0 35.0 0.00 H BPV H BPV FMC 7/17/2021 37.2 37.2 0.00 EMERGENCY SLIPS Casing landed on emergency slips 6/29/2021 7.625 7,815.0 5,968.5 47.42 TEC LINE HAlliburton TEC line was pinched in Air slips 7/15/2021 Mandrel Inserts St ati on N o/Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Make Model OD (in) Serv Valve Type Latch Type Port Size (in) TRO Run (psi) Run Date Com 1 1,927.6 1,889.2 25.87 Camco KBMG 1 INJ DMY BK 7/16/2021 2 11,338.5 8,219.6 69.61 Camco KBMG 1 INJ DMY BK 7/16/2021 Notes: General & Safety End Date Annotation NOTE: HORIZONTAL, MT7-03, 8/10/2021 2:33:04 PM Vertical schematic (actual) INTERMEDIATE; 37.1- 11,624.1 SLIDING SLEEVE; 11,605.3 NIPPLE; 11,542.2 PACKER; 11,473.1 INJ; 11,338.5 SURFACE; 39.8-3,523.4 INJ; 1,927.6 NIPPLE; 1,865.1 CONDUCTOR; 39.8-120.0 EMERGENCY SLIPS; 37.2 HANGER; 34.3 WNS SVC KB-Grd (ft) 39.90 Rig Release Date 7/17/2021 MT7-03 ... TD Act Btm (ftKB) 21,050.0 Well Attributes Field Name RENDE Wellbore API/UWI 501032083000 Wellbore Status SVC Max Angle & MD Incl (°) 95.54 MD (ftKB) 19,972.21 WELLNAME WELLBOREMT7-03 H2S (ppm) DateComment SSSV: NONE Annotation LAST WO: End Date Page 1/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/5/2021 00:00 6/5/2021 12:00 12.00 MIRU, MOVE DMOB P Blow down all steam & water lines, Prep floor & derrick f/ scope, Scope derrick, Unspool drill line, Secure Energy track in derrick, Swap t/ cold start power, Unhook power lines rig module inter- connects, Raise C-section & stage csg complex, Lower cattle chute & stage power complex, Skid rig floor & stage pump complex, Lower derrick & stage pit complex, Raise cellar wind walls, Unpin & stomp pipe shed from under sub 0.0 0.0 6/5/2021 12:00 6/5/2021 14:00 2.00 MIRU, MOVE DMOB P Walk pipe shed away f/ sub, Walk sub off of MT7-04 well 0.0 0.0 6/5/2021 14:00 6/5/2021 17:00 3.00 MIRU, MOVE MOB P Walk sub section in place on MT7-03 0.0 0.0 6/5/2021 17:00 6/5/2021 22:00 5.00 MIRU, MOVE MOB P Walk pipe shed in place under sub & pin same, 0.0 0.0 6/5/2021 22:00 6/6/2021 00:00 2.00 MIRU, MOVE MOB P Raise cattle chute, Lower C-section, Hook up inter-connects between complexes 0.0 0.0 6/6/2021 00:00 6/6/2021 03:30 3.50 MIRU, MOVE MOB P Bridle up & scope derrick, Bridle down, Install kelly hose t/ TDS, Continue t/ connect rig interconnects Complete rig acceptance check list Rig accepted @ 03:30 on 6/6/21 120.0 120.0 6/6/2021 03:30 6/6/2021 10:00 6.50 MIRU, MOVE NUND P Nipple up riser t/ conductor, C/O saver sub SIMOPS: Preping pits t/ receive spud mud, dress shakers f/ surface, Take on 10.5 ppg mud 120.0 120.0 6/6/2021 10:00 6/6/2021 11:00 1.00 MIRU, MOVE OTHR P Install 4'' conductor valves, Load surface BHA in pipe shed SIMOPS: Install diverter line 0.0 0.0 6/6/2021 11:00 6/6/2021 13:30 2.50 MIRU, MOVE PULD P P/U 5'' HWDP & jars, Rack same in derrick 0.0 0.0 6/6/2021 13:30 6/6/2021 16:00 2.50 MIRU, MOVE PULD P P/U 5'' handling tools, Function test hydril & diverter valve, Chk. jet & hole fill lines SIMOPS: Install diverter line 0.0 0.0 6/6/2021 16:00 6/6/2021 17:00 1.00 MIRU, MOVE PULD P PJSM, P/U mud motor, stab, & NMPC, Make up bit 0.0 65.0 6/6/2021 17:00 6/6/2021 17:30 0.50 MIRU, MOVE PRTS P Function test diverter, Test ok, Koomey draw down test, System 3,000 psi, After fucntion 2,100 psi, 200 psi build in 10 seconds, Full system psi in 53 seconds 120.0 120.0 6/6/2021 17:30 6/6/2021 18:00 0.50 MIRU, MOVE PRTS P Fill & test mud lines t/ 3,500 psi f/ 5 minutes, Test good 120.0 120.0 6/6/2021 18:00 6/6/2021 19:00 1.00 MIRU, MOVE SLPC P PJSM, Slip & cut 102' drill line 120.0 120.0 6/6/2021 19:00 6/6/2021 19:30 0.50 MIRU, MOVE SVRG P Rig service, Grease & check oil in TDS & drawworks, Grease crown cluster 120.0 120.0 6/6/2021 19:30 6/6/2021 20:00 0.50 MIRU, MOVE SFTY P Pre-Spud meeting w/ drill crew 120.0 120.0 6/6/2021 20:00 6/6/2021 20:30 0.50 MIRU, MOVE WASH P Clean out conductor f/ 105' t/ 120' GPM- 450 RPM- 40 120.0 120.0 Rig: DOYON 25 Page 2/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/6/2021 20:30 6/6/2021 22:00 1.50 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 120' t/ 243' WOB- 3-4K RPM-40 Torq.-3-5K GPM-450 On Btm PSI- 650 Off Btm PSI- 500 Flow out- 45% ECD- 10.87 PPG P/U- 55K S/O- 48K Rot- 48K AST- 0 ART- 1.7 ADT- 1.7 Total Bit Hrs- 1.7 Total Jars- 0 120.0 243.0 6/6/2021 22:00 6/6/2021 22:30 0.50 SURFAC, DRILL TRIP P TOH t/ Pick up MWD f/ 243' t/ 59' 243.0 59.0 6/6/2021 22:30 6/7/2021 00:00 1.50 SURFAC, DRILL BHAH P PJSM, P/U OnTrak, Stabs, Filter Sub, Scribe UBHO t/ motor 59.0 178.0 6/7/2021 00:00 6/7/2021 01:00 1.00 SURFAC, DRILL BHAH P PJSM, P/U stab, NMDC, filter sub, & UBHO 178.0 178.0 6/7/2021 01:00 6/7/2021 01:15 0.25 SURFAC, DRILL WASH P Wash f/ 178' t/ 243' 178.0 243.0 6/7/2021 01:15 6/7/2021 02:45 1.50 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 243' t/ 361' WOB- 3-4K RPM-40 Torq.-3-5K GPM-500 On Btm PSI- 920 Off Btm PSI- 800 Flow out- 45% ECD- 10.87 PPG P/U- 85K S/O- 85K Rot- 85K AST- 0 ART- 1 ADT- 1 Total Bit Hrs- 2.7 Total Jars- 0 243.0 361.0 6/7/2021 02:45 6/7/2021 03:00 0.25 SURFAC, DRILL BKRM P BROOH f/ 361' t/ 269' GPM-500 RPM-40 361.0 269.0 6/7/2021 03:00 6/7/2021 03:30 0.50 SURFAC, DRILL SLKL P PJSM, R/U SLB slick line & P/U Scientific Gyro due to Baker MWD having interference 269.0 269.0 6/7/2021 03:30 6/7/2021 04:30 1.00 SURFAC, DRILL SLKL P RIH w/ slick line & take Gyro survey @ 108' POOH w/ slick line & RIH w/ stand 5'' HWDP RIH w/ slick line & take Gyro survey @ 200' POOH w/ slick line 269.0 361.0 Rig: DOYON 25 Page 3/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/7/2021 04:30 6/7/2021 06:00 1.50 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 361' t/ 576' WOB- 4-8K RPM-50 Torq.-3-5K GPM-550 On Btm PSI- 1095 Off Btm PSI- 875 Flow out- 50% ECD- 10.83 PPG P/U- 85K S/O- 81K Rot- 83K AST- 0 ART- 1 ADT- 1 Total Bit Hrs- 3.7 Total Jars- 0 361.0 576.0 6/7/2021 06:00 6/7/2021 12:00 6.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 576' t/ 832' WOB- 25-30K RPM-50 Torq.-3-5K GPM-550 On Btm PSI- 1378 Off Btm PSI- 1200 Flow out- 50% ECD- 10.58 PPG P/U- 103K S/O- 102K Rot- 102K AST- .5 ART- 3.5 ADT- 4.0 Total Bit Hrs- 7.2 Total Jars- 3.0 576.0 832.0 6/7/2021 12:00 6/7/2021 18:00 6.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 832' t/ 1,280' WOB- 25-30K RPM-50 Torq.-3-5K GPM-650 On Btm PSI- 1506 Off Btm PSI- 1350 Flow out- 50% ECD- 11.39 PPG P/U- 103K S/O- 102K Rot- 102K AST- 1.4 ART- 3.4 ADT- 4.8 Total Bit Hrs- 12.0 Total Jars- 7.8 832.0 1,280.0 Rig: DOYON 25 Page 4/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/7/2021 18:00 6/8/2021 00:00 6.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 1,280' t/ 1,710' WOB- 12-16K RPM-50 Torq.-3-5K GPM-800 On Btm PSI- 2315 Off Btm PSI- 2115 Flow out- 61% ECD- 11.44 PPG P/U- 103K S/O- 102K Rot- 102K AST- 2.6 ART- 1.9 ADT- 4.5 Total Bit Hrs- 16.5 Total Jars- 12.3 1,280.0 1,710.0 6/8/2021 00:00 6/8/2021 06:00 6.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 1,710' t/ 2,330' WOB- 6-22K RPM-50 Torq.-3-5K GPM-850 On Btm PSI- 2900 Off Btm PSI- 2700 Flow out- 61% ECD- 11.67 PPG P/U- 130K S/O- 126K Rot- 127K AST- 1.8 ART- 2.6 ADT- 4.4 Total Bit Hrs- 20.9 Total Jars- 16.7 1,710.0 2,330.0 6/8/2021 06:00 6/8/2021 11:00 5.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 2,330' t/ 2,761' WOB- 6-22K RPM-50 Torq.-3-5K GPM-850 On Btm PSI- 3160 Off Btm PSI- 3000 Flow out- 61% ECD- 11.81 PPG P/U- 126K S/O- 123K Rot- 122K AST- 1.6 ART- 2.0 ADT- 3.6 Total Bit Hrs- 24.5 Total Jars- 20.3 2,330.0 2,761.0 6/8/2021 11:00 6/8/2021 13:30 2.50 SURFAC, DRILL CIRC T Packed off flow line w/ clay @ 2,761', Broke hatches on flow line & got clay out of flow line, Stage pumps back up t/ 900 gpm & circ byms up before going back to drilling 2,761.0 2,761.0 Rig: DOYON 25 Page 5/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/8/2021 13:30 6/8/2021 14:30 1.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 2,761' t/ 2,927' WOB- 6-22K RPM-50 Torq.-6-8K GPM-900 On Btm PSI- 3250 Off Btm PSI- 3000 Flow out- 61% ECD- 11.52 PPG P/U- 134K S/O- 125K Rot- 127K AST- .5 ART- 2.0 ADT- 2.5 Total Bit Hrs- 27 Total Jars- 22.8 2,761.0 2,927.0 6/8/2021 14:30 6/8/2021 16:30 2.00 SURFAC, DRILL CIRC T Clear cuttings f/ flow line @ 2,927' Pulled Geolog gas monitor out of flow line t/ help keep cuttings from building up in flow line Stage pumps back up t/ 850 gpm & curculate btms up before going back t/ drilling 2,927.0 2,927.0 6/8/2021 16:30 6/8/2021 18:00 1.50 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 2,927' t/ 3,030' WOB- 15-22K RPM-60 Torq.-6-8K GPM-900 On Btm PSI- 3280 Off Btm PSI- 3000 Flow out- 61% ECD- 11.62 PPG P/U- 134K S/O- 125K Rot- 127K AST- .25 ART- 1 ADT- 1.25 Total Bit Hrs- 27.1 Total Jars- 22.9 2,927.0 3,030.0 6/8/2021 18:00 6/9/2021 00:00 6.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 3,030' t/ 3,523' WOB- 22-28K RPM-60 Torq.-6-8K GPM-860 On Btm PSI- 3475 Off Btm PSI- 3300 Flow out- 61% ECD- 11.49 PPG P/U- 139K S/O- 130K Rot- 135K AST- 0 ART- 4.9 ADT- 4.9 Total Bit Hrs- 32 Total Jars- 27.8 3,030.0 3,523.0 Rig: DOYON 25 Page 6/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/9/2021 00:00 6/9/2021 00:30 0.50 SURFAC, DRILL CIRC T Clear clay from flow line @ 3,523' Stage pumps back up t/ 850 GPM 3,523.0 3,523.0 6/9/2021 00:30 6/9/2021 00:45 0.25 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 3,523' t/ 3,533' WOB- 22-28K RPM-60 Torq.-6-8K GPM-860 On Btm PSI- 3572 Off Btm PSI- 3300 Flow out- 61% ECD- 11.49 PPG P/U- 153K S/O- 140K Rot- 14135K AST- 0 ART- .1 ADT- .1 Total Bit Hrs- 32.1 Total Jars- 27.9 3,523.0 3,533.0 6/9/2021 00:45 6/9/2021 05:30 4.75 SURFAC, CASING CIRC P Circ 4 sweeps around racking back a stand after each sweep is out of the hole GPM- 850 RPM- 50 3,533.0 3,161.0 6/9/2021 05:30 6/9/2021 06:00 0.50 SURFAC, CASING OWFF P Flow chek. well, Well static 3,161.0 3,161.0 6/9/2021 06:00 6/9/2021 11:30 5.50 SURFAC, CASING PMPO P Pump out of hole f/ 3,161' t/ 1,768' GPM-500 PSI-1150 3,161.0 1,768.0 6/9/2021 11:30 6/9/2021 14:00 2.50 SURFAC, CASING TRIP P TOH on elevators f/ 1,768' t/ 549' Monitoring hole fill on the trip tank 1,768.0 549.0 6/9/2021 14:00 6/9/2021 14:30 0.50 SURFAC, CASING BHAH P Rack back 5'' HWDP & jars, Monitor hole fill on trip tank 549.0 181.0 6/9/2021 14:30 6/9/2021 17:30 3.00 SURFAC, CASING BHAH P PJSM, L/D 16'' surface BHA as per Baker directional reps 181.0 0.0 6/9/2021 17:30 6/9/2021 18:00 0.50 SURFAC, CASING CLEN P Clean rig floor prior t/ rigging up casing equipment, L/D surface BHA handling tools 0.0 0.0 6/9/2021 18:00 6/9/2021 20:30 2.50 SURFAC, CASING RURD P PJSM, Pick up Volant tool & make up t/ TDS, Pick up casing spider, add bail extension t/ TDS, Install side door elevators 0.0 0.0 6/9/2021 20:30 6/9/2021 23:00 2.50 SURFAC, CASING PUTB T PJSM, Attempt t/ make up 13 3/8'' shoe track, Joint torqued up before reaching diamond, backed out joint & found gaulded threads on pin & box, L/D joint down & replaced. Cleaned shoe joint box threads w/ file, P/U joint & made up t/ shoe joint successful, Break collar off joint & baker lok same, Install collar back up on joint & finished making up shoe track w/ no issues, Checked float, OK 0.0 119.0 6/9/2021 23:00 6/10/2021 00:00 1.00 SURFAC, CASING PUTB P RIH w/ 13 3/8'' BTC-M csing f/ 119' t/ 352' Fill csing on the fly w/ Volant tool every joint, Ensure csing is full every 10 joints, Monitoring returns on the trip tanks 119.0 352.0 6/10/2021 00:00 6/10/2021 02:00 2.00 SURFAC, CASING PUTB P RIH w/ 13 3/8'' BTC-M csing f/ 352' t/ 1,093' monitoring retruns on trip tan Filling every joint & topping csing off every 10 joints 352.0 1,093.0 Rig: DOYON 25 Page 7/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/10/2021 02:00 6/10/2021 02:45 0.75 SURFAC, CASING CIRC P Circ. btms up @ 1,093' w/ working csing f/ 1,093' t/ 1,053' Staged pumps up f/ 2 bpm t/ 6 bpm ICP-132 FCP-82 Total stks pumped- 1,051 1,093.0 1,093.0 6/10/2021 02:45 6/10/2021 03:15 0.50 SURFAC, CASING PUTB P RIH w/ 13 3/8'' BTC-M casing f/ 1093' t/ 1,215' monitoring returns on trip tank Filling every joint & topping casing off every 10 joints 1,093.0 1,215.0 6/10/2021 03:15 6/10/2021 03:30 0.25 SURFAC, CASING PUTB P PJSM, P/U XO f/ 13 3/8'' BTC-M t/ HYD563 1,215.0 1,218.0 6/10/2021 03:30 6/10/2021 10:30 7.00 SURFAC, CASING PUTB P RIH w/ 13 3/8'' H563 casing f/ 1,218' t/ 3,479' monitoring returns on trip tank Filling every joint & topping casing off every 10 joints Washed f/ 1,440' t/ 1,480' & f/ 2,920' t/ 2,940' BPM-5 1,218.0 3,479.0 6/10/2021 10:30 6/10/2021 11:00 0.50 SURFAC, CASING PUTB P P/U 13 3/8'' FMC hanger & Landing joint & Verify land out in wellhead 3,479.0 3,522.0 6/10/2021 11:00 6/10/2021 14:00 3.00 SURFAC, CEMENT CIRC P Circ & condition mud for surface cement job while reciprocating casing f/ 3,520' t/ 3,508' BPM-8 ICP-243 FCP-236 Total Strokes-9,985 P/U-266K S/O-188K 3,522.0 3,522.0 6/10/2021 14:00 6/10/2021 15:00 1.00 SURFAC, CEMENT OTHR P Blow down TDS & Volant tool, M/U SLB cement line t/ Volant tool 3,522.0 3,522.0 6/10/2021 15:00 6/10/2021 20:45 5.75 SURFAC, CEMENT CMNT P SLB pump 5 bbls of fresh H2O. Tested lines to 500 psi low/ 3500 psi high, pump 100 bbls of 10.8 ppg Mud Push II @ 5 bbls/min, 390 psi, 17% F/O, Dropped bottom plug. Start batching lead. Pump 483 bbls of 11.0 ppg DeepCRETE cement at 5.5 bbls/min, 400 psi ICP, F/O 15%. Batch and pump 72 bbls of G Blend Tail 15.8 ppg cement @ 4.5 bbls/min, 225 psi, F/O 16%. Drop top plug & kick out with 20 bbls of fresh H2O. Swap to rig & displace w/ 11 ppg Ksi mud @ 6 bbls/min, 490 psi, F/O 20%. Bump plug with 1050 psi (494 bbls + 20 bbls). 4180 strokes, final circ. PSI 428 @ 2bpm, Pressure up to 1050 psi & hold for 5 minutes. Bleed off pressure, Check floats, Floats holding, 175 bbls 11.0 ppg cement to surface. 3,522.0 3,522.0 6/10/2021 20:45 6/10/2021 22:00 1.25 SURFAC, CEMENT NUND P PJSM, Back out landing joint & L/D Same, Flush diverter & riser w/ blackwater, Drain stack & flush flowline 3,522.0 3,522.0 6/10/2021 22:00 6/10/2021 23:00 1.00 SURFAC, CEMENT PULD P PJSM, Make service break on Volant tool w/ rig tongs, L/D Volant tool & casing handling equipment 3,522.0 3,522.0 6/10/2021 23:00 6/11/2021 00:00 1.00 SURFAC, CEMENT NUND P PJSM, Nipple down riser & diverter 3,522.0 3,522.0 Rig: DOYON 25 Page 8/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/11/2021 00:00 6/11/2021 02:45 2.75 SURFAC, CEMENT NUND P Pull mouse hole, N/D diverter & rack same back in carrier, N/D surface riser & lay out same, Pull diverter T & knife valve w/ front end loader, Clean wellhead with pressure washer 3,522.0 3,522.0 6/11/2021 02:45 6/11/2021 03:30 0.75 SURFAC, CEMENT CLEN P Remove 4'' valves f/ conductor & cap same, Clean out cellar 3,522.0 3,522.0 6/11/2021 03:30 6/11/2021 06:00 2.50 SURFAC, WHDBOP NUND P Nipple up FMC wellhead per rep, Nipple up 2.97' & 14' risers & torque same Test wellhead t/ 1,000 psi f/ 10 minutes, test witnessed by COPA rep. Get RKB measurements t/ lockdown studs 3,522.0 3,522.0 6/11/2021 06:00 6/11/2021 08:45 2.75 SURFAC, WHDBOP NUND P PJSM, Nipple up BOPE, Install Joe's box & flow line, Install choke & kill lines, Install mouse holes SIMOPS: N/U MPD equipment 3,522.0 3,522.0 6/11/2021 08:45 6/11/2021 09:00 0.25 SURFAC, WHDBOP BOPE P PJSM, P/U 5'' test joint, Install lower test plug, Install MPD test cap 3,522.0 3,522.0 6/11/2021 09:00 6/11/2021 10:15 1.25 SURFAC, WHDBOP BOPE P Flood stack & MPD line w/ water f/ test, Tes MPD 250 low, 1,250 high, Tes good, Pull MPD test cap 3,522.0 3,522.0 6/11/2021 10:15 6/11/2021 11:15 1.00 SURFAC, WHDBOP OTHR P Install 5'' test joint, Fill choke & BOP w/ water, Attmept shell test t/ 3,500 psi, Failed test 3,522.0 3,522.0 6/11/2021 11:15 6/11/2021 12:00 0.75 SURFAC, WHDBOP OTHR P PJSM, C/O door seal on kill side upper door, Re-fill stack w/ water 3,522.0 3,522.0 6/11/2021 12:00 6/11/2021 17:00 5.00 SURFAC, WHDBOP BOPE P Test BOPE all tests 250 psi low for 5 min, 3,500 psi high for 10 minutes each with 5" - test annular and 2 7/8" x 5 1/2" UPR and LPR, test choke valves 1-15, manual and super choke, choke and kill manual's and HCR's, 4" valve on kill line, 2 x 4" FOSV, upper and lower IBOP, blind/shear rams. Perform Koomey drawdown, ACC=3050 psi, manifold=1500 psi initial. After all functions, accumulator=1600 psi, 17 secs to 200 psi with two electric pumps, 110 secs to build to full system pressure with two electric and two air pumps. Closing times, annular=24 secs, UPR=19 secs, blind/shears=17 secs, LPR=16 secs, choke HCR=2 secs, kill HCR=2 secs. 6 Nitrogen bottles back-up avg=1908 psi, CPAI witnessed. Tested PVT, gain/loss, flow out, LEL and H2S alarms. AOGCC Rep Austin Mcleod waived witness via email on 6/9/21 @ 07:52, BLM Rep Mutasim Elganzoory waived witness of test via email on 6/7/21 @ 07:34 3,522.0 3,522.0 6/11/2021 17:00 6/11/2021 18:00 1.00 SURFAC, WHDBOP OTHR P Pull test plug & intall wear bushing per FMC rep Wear bushing ID 12 7/16'' Length-3.51' 3,522.0 3,522.0 6/11/2021 18:00 6/11/2021 18:30 0.50 SURFAC, DRILLOUT OTHR P Blow down choke manifold, kill line, & MPD 3,522.0 3,522.0 6/11/2021 18:30 6/11/2021 19:45 1.25 SURFAC, DRILLOUT BHAH P PJSM, M/U 12 1/4'' Clean assembly 3,522.0 3,522.0 6/11/2021 19:45 6/11/2021 21:30 1.75 SURFAC, DRILLOUT TRIP P TIH f/ 413' t/ 3,400' monitoring returns on trip tank 3,522.0 3,522.0 Rig: DOYON 25 Page 9/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/11/2021 21:30 6/11/2021 22:00 0.50 SURFAC, DRILLOUT CIRC P Circ btms up @ 3,400' GPM- 500 3,522.0 3,522.0 6/11/2021 22:00 6/12/2021 00:00 2.00 SURFAC, DRILLOUT PRTS P Space out t/ close top rams on pipe, Pump down drill pipe & kill line f/ casing test 58 strokes, 6.8 bbls t/ 3,500 psi Annular pressure bled off 200 psi immediately after pumps was shut down, Monitored for 5 minutes and pressure continued t/ fall but stand pipe pressure was staying constant. Bled pressure off both and found pressure transducer for annular was bad. Changed tranducer & pressured casing back up t/ 3,500 psi w/ 58 strokes, 6.8 bbls. 3,640 psi start 3,608 psi end Casing test good, Bled back 6.5 bbls t/ trip tank 3,522.0 3,522.0 6/12/2021 00:00 6/12/2021 04:30 4.50 SURFAC, DRILLOUT DRLG P Drill shoe track f/ 3,443' t/ 3,522' Drill cement f/ 3,522' t/ 3,533' GPM-500 PSI-915 Flow Out-27% WOB-18-22 RPM-100 Torq-6-10 3,522.0 3,533.0 6/12/2021 04:30 6/12/2021 05:30 1.00 SURFAC, DRILLOUT DRLG P Drill 20' new 12 1/4'' hole f/ 3,533' t/ 3,553' Displace hole t/ 9.6 ppg LSND mud w/ drilling 20' new hole GPM-600 PSI-1290 Flow Out-31% WOB-10-15 RPM-100 Torq-6-10 3,533.0 3,553.0 6/12/2021 05:30 6/12/2021 06:30 1.00 SURFAC, DRILLOUT CIRC P Circ & condition mud f/ FIT, Rot & reciprocate pipe 3,553' t/ 3,533' GPM-600 PSI-725 Flow out-27% RPM-40 Torq-3 3,553.0 3,553.0 6/12/2021 06:30 6/12/2021 07:00 0.50 SURFAC, DRILLOUT FIT P Fill surface lines w/ mud, Perfrom FIT t/ 18 ppg equivalent 1,420 psi, 6 bbls pumped 3,553.0 3,553.0 6/12/2021 07:00 6/12/2021 07:30 0.50 INTRM1, DRILL OWFF P Flow check well. Well static 3,553.0 3,553.0 6/12/2021 07:30 6/12/2021 08:00 0.50 INTRM1, DRILL OTHR P Drop gyro & let tool activate, Monitor well on trip tank 3,553.0 3,553.0 6/12/2021 08:00 6/12/2021 12:00 4.00 INTRM1, DRILL TRIP P TOH f/ 3,553' t/ 44' Taking gyro surveys every connection on trip out, Monitor returns on trip tank 3,553.0 44.0 6/12/2021 12:00 6/12/2021 12:30 0.50 INTRM1, DRILL BHAH P PJSM, Break bit, L/D stab, bit, bit sub & NMDC 44.0 0.0 Rig: DOYON 25 Page 10/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/12/2021 12:30 6/12/2021 13:00 0.50 INTRM1, DRILL CLEN P Clean rig floor & after trip & handling of BHA 0.0 0.0 6/12/2021 13:00 6/12/2021 16:30 3.50 INTRM1, DRILL BHAH P PJSM, P/U Vertical BHA as per Baker DD, Load radioactive sources in logging tools Monitoring returns on trip tank 0.0 624.0 6/12/2021 16:30 6/12/2021 17:00 0.50 INTRM1, DRILL TRIP P TIH f/ 624' t/ 1,565' monitoring returns on trip tanks 624.0 1,565.0 6/12/2021 17:00 6/12/2021 17:15 0.25 INTRM1, DRILL OTHR P Shallow hole test MWD tool @ 1,565' GPM-550 Total stks- 1046 1,565.0 1,565.0 6/12/2021 17:15 6/12/2021 18:30 1.25 INTRM1, DRILL TRIP P Cont TIH f/ 1,565' t/ 3,457' monitoring returns on the trip tank 1,565.0 3,457.0 6/12/2021 18:30 6/12/2021 19:00 0.50 INTRM1, DRILL WASH P Wash f/ 3,457' t/ 3,553' while syncing up MWD & logging tools GPM-1,005 Flow out-28% RPM-35 3,457.0 3,553.0 6/12/2021 19:00 6/12/2021 22:00 3.00 INTRM1, DRILL DDRL P Drill 9 7/8'' Vertical section f/ 3,553' t/ 3,690' WOB- 14-18K RPM-90 Torq.-6-8K GPM-650 On Btm PSI- 1180 Flow out- 29% ECD- 9.89 PPG P/U- 160K S/O- 133K Rot- 144K ADT- 2.4 Total Bit Hrs- 2.4 Total Jars- 30.8 3,553.0 3,690.0 6/12/2021 22:00 6/12/2021 23:00 1.00 INTRM1, DRILL CIRC P Open 11'' reamer as per SLB spec sheet Drop ball & pump t/ seat @ 1 bpm, Seen increase f/ 100 psi t/ 300 psi but psi would not increase. Made call to SLB rep and he had us bring RPM t/ 60 and stage pumps up to 250 gpm, Seen an increase in pressure f/ 500 psi t/ 1,160 psi, Reamer shifted and observed pressure drop t/ 235 psi. Befroe ball drop GPM-850 PSI-1860 Turbine RPM-4792 After reamer shift GPM-850 PSI-1660 Turbine RPM-4588 Perform 10K ledge test ok 3,690.0 3,690.0 Rig: DOYON 25 Page 11/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/12/2021 23:00 6/13/2021 00:00 1.00 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 3,690' t/ 3,776' WOB- 14-18K RPM-150 Torq.-10-14K GPM-850 On Btm PSI- 1620 Flow out- 35% ECD- 10.03 PPG P/U- 160K S/O- 133K Rot- 144K ADT- .7 Total Bit Hrs- 3.1 Total Jars- 31.5 3,690.0 3,776.0 6/13/2021 00:00 6/13/2021 06:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 3,776' t/ 4,490' WOB- 20-25K RPM-150 Torq.-10-15K GPM-900 On Btm PSI- 1990 Flow out- 41% ECD- 10.24 PPG P/U- 163K S/O- 143K Rot- 150K ADT- 4.6 Total Bit Hrs- 7.7 Total Jars- 36.1 3,776.0 4,490.0 6/13/2021 06:00 6/13/2021 12:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 4,490' t/ 5,244' WOB- 20-25K RPM-160 Torq.-10-15K GPM-1050 On Btm PSI- 2800 Flow out- 41% ECD- 10.24 PPG P/U- 184K S/O- 151K Rot- 165K ADT- 4.9 Total Bit Hrs- 12.6 Total Jars- 41 Increase GPM t/ 950 @ 4,670' Increase GPM t/ 1000 @ 4,771' Increase GPM t/ 1050 @ 4,894' 4,490.0 5,244.0 Rig: DOYON 25 Page 12/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/13/2021 12:00 6/13/2021 18:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 5,244' t/ 5,980' WOB- 20-25K RPM-160 Torq.-14-18K GPM-1050 On Btm PSI- 3070 Flow out- 47% ECD- 10.6 PPG P/U- 205K S/O- 152K Rot- 171K ADT- 4.6 Total Bit Hrs- 17.2 Total Jars- 45.6 5,244.0 5,980.0 6/13/2021 18:00 6/13/2021 22:00 4.00 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 5,980' t/ 6,378' WOB- 20-25K RPM-160 Torq.-14-18K GPM-1050 On Btm PSI- 3115 Flow out- 47% ECD- 10.41 PPG P/U- 215K S/O- 150K Rot- 178K ADT- 2.7 Total Bit Hrs- 19.9 Total Jars- 48.3 5,980.0 6,378.0 6/13/2021 22:00 6/13/2021 22:30 0.50 INTRM1, DRILL SVRG P Rig service, Grease TDS & Drawworks, Check oil in same 6,378.0 6,378.0 6/13/2021 22:30 6/14/2021 00:00 1.50 INTRM1, DRILL RGRP T Circ. @ 525 GPM w/ rebuilding pump pop offs Rotate & reciprocate pipe f/ 6,378' t/ 6,300' GPM-525 PSI-835 RPM-40 Torq-10K Pump #2 pop off started blowing @ 3,100 psi, personnel reset pop off numerous times and rig couldn't drill more than 5 minutes and pop off would blow again. Rig crew swapped out pop off and spare pop off blew immediately when psi was brought t/ 2,500 Both pop offs had been bench tested and went @ 3,800 PSI 6,378.0 6,378.0 Rig: DOYON 25 Page 13/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/14/2021 00:00 6/14/2021 01:00 1.00 INTRM1, DRILL RGRP T Circ. @ 525 GPM w/ rebuilding pump pop offs Rotate & reciprocate pipe f/ 6,378' t/ 6,300' GPM-525 PSI-835 RPM-40 Torq-10K Pump #2 pop off started blowing @ 3,100 psi, personnel reset pop off numerous times and rig couldn't drill more than 5 minutes and pop off would blow again. Rig crew swapped out pop off and spare pop off blew immediately when psi was brought t/ 2,500 Both pop offs had been bench tested and went @ 3,800 PSI 6,378.0 6,378.0 6/14/2021 01:00 6/14/2021 06:00 5.00 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 6,378' t/ 6,937' WOB- 12-17K RPM-160 Torq.-14-18K GPM-1050 On Btm PSI- 2865 Flow out- 49% ECD- 10.33 PPG P/U- 217K S/O- 163K Rot- 194K ADT- 3.7 Total Bit Hrs- 23.6 Total Jars- 52 Flow checked well f/ 10 minutes after drilling Albian 93 @ 6,490' +/- Dumped 605 bbls of old mud @ 6,500' & added 551 bbls fresh 9.6 ppg LSND 6,378.0 6,937.0 6/14/2021 06:00 6/14/2021 12:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 6,937' t/ 7,646' WOB- 22-26K RPM-160 Torq.-18-22K GPM-1050 On Btm PSI- 3246 Flow out- 49% ECD- 10.45 PPG P/U- 280K S/O- 170K Rot- 209K ADT- 4.6 Total Bit Hrs- 28.2 Total Jars- 56.6 6,937.0 7,646.0 Rig: DOYON 25 Page 14/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/14/2021 12:00 6/14/2021 15:30 3.50 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 7,646' t/ 8,073' WOB- 18-22K RPM-160 Torq.-18-22K GPM-1050 On Btm PSI- 3340 Flow out- 49% ECD- 10.49 PPG P/U- 280K S/O- 170K Rot- 209K ADT- 2.7 Total Bit Hrs- 30.9 Total Jars- 59.3 7,646.0 8,073.0 6/14/2021 15:30 6/14/2021 16:00 0.50 INTRM1, DRILL SVRG P Rig service, Grease TDS & drawworks, Check oil in same 8,073.0 8,073.0 6/14/2021 16:00 6/14/2021 16:30 0.50 INTRM1, DRILL RGRP T Reciprocate & rotate pipe w/ changing pump pop offs GPM-500 PSI-1050 RPM-50 8,073.0 8,073.0 6/14/2021 16:30 6/14/2021 18:00 1.50 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 8,073' t/ 8,259' WOB- 18-22K RPM-160 Torq.-18-22K GPM-1050 On Btm PSI- 3380 Flow out- 49% ECD- 10.58 PPG P/U- 249K S/O- 188K Rot- 213K ADT- 1 Total Bit Hrs- 32 Total Jars- 60.4 8,073.0 8,259.0 6/14/2021 18:00 6/15/2021 00:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 8,259' t/ 8,966' WOB- 18-22K RPM-160 Torq.-22-24K GPM-1050 On Btm PSI- 3560 Flow out- 46% ECD- 10.62 PPG P/U- 269K S/O- 194K Rot- 222K ADT- 4.8 Total Bit Hrs- 36.8 Total Jars- 65.2 8,259.0 8,966.0 Rig: DOYON 25 Page 15/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/15/2021 00:00 6/15/2021 04:00 4.00 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 8,966' t/ 9,394' WOB- 18-22K RPM-160 Torq.-22-24K GPM-950 On Btm PSI- 3335 Flow out- 44.8% ECD- 10.10.62 PPG P/U- 269K S/O- 194K Rot- 222K ADT- 4.8 Total Bit Hrs- 36.8 Total Jars- 65.2 8,966.0 9,394.0 6/15/2021 04:00 6/15/2021 04:45 0.75 INTRM1, DRILL CIRC P Circ btms up @ 9,394' w/ rotating & reciprocating pipe GPM-975 RPM-50 9,394.0 9,394.0 6/15/2021 04:45 6/15/2021 05:45 1.00 INTRM1, DRILL MPDA P PJSM, Flow check well, Install rotating head assembly & break in bearing as per Beyond procedure 9,394.0 9,394.0 6/15/2021 05:45 6/15/2021 12:00 6.25 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 9,394' t/ 9,891' WOB- 18-22K RPM-160 Torq.-24-28K GPM-900 On Btm PSI- 3374 Flow out- 48% ECD- 11.3 PPG P/U- 310K S/O- 172K Rot- 232K ADT- 4.6 Total Bit Hrs- 44.6 Total Jars- 73 9,394.0 9,891.0 6/15/2021 12:00 6/15/2021 18:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 9,891' t/ 10,402' WOB- 30-35K RPM-160 Torq.-24-28K GPM-900 On Btm PSI- 3425 Flow out- 45% ECD- 11.32 PPG P/U- 310K S/O- 172K Rot- 232K ADT- 4.9 Total Bit Hrs- 49.5 Total Jars- 77.9 9,891.0 10,402.0 Rig: DOYON 25 Page 16/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/15/2021 18:00 6/15/2021 19:15 1.25 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 10,402' t/ 10,435' WOB- 30-35K RPM-160 Torq.-24-28K GPM-865 On Btm PSI- 3260 Flow out- 52% ECD- 11.41 PPG P/U- 310K S/O- 172K Rot- 232K ADT- .8 Total Bit Hrs- 50.3 Total Jars- 78.7 10,402.0 10,435.0 6/15/2021 19:15 6/15/2021 20:15 1.00 INTRM1, DRILL OTHR T C/O joint of drill pipe due t/ NOVOS closing PS 21 slips on joint while going through its connection cycle. Working with drillers & NOV to see if issue was caused my setting drillers had input into NOVOS system. Had t/ backream joint f/ 10,435' t/ 10,430' GPM 850 RPM-80 After swapping out joint had t/ ream back t/ bottom w/ same parameters 10,435.0 10,435.0 6/15/2021 20:15 6/16/2021 00:00 3.75 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 10,435' t/ 10,709' WOB- 30-35K RPM-160 Torq.-24-28K GPM-885 On Btm PSI- 3380 Flow out- 44% ECD- 11.36 PPG P/U- 310K S/O- 172K Rot- 232K ADT- 2.9 Total Bit Hrs- 53.2 Total Jars- 81.6 10,435.0 10,709.0 6/16/2021 00:00 6/16/2021 06:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 10,709' t/ 11,220' WOB- 30-35K RPM-160 Torq.-27-30K GPM-855 On Btm PSI- 3380 Flow out- 44% ECD- 11.34 PPG P/U- 310K S/O- 172K Rot- 232K ADT- 5 Total Bit Hrs- 58.2 Total Jars- 86.6 10,709.0 11,220.0 Rig: DOYON 25 Page 17/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/16/2021 06:00 6/16/2021 12:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 11,220' t/ 11,599' WOB- 20-25K RPM-160 Torq.-22-26K GPM-840 On Btm PSI- 3270 Flow out- 42% ECD- 11.16 PPG P/U- 310K S/O- 172K Rot- 232K ADT- 5 Total Bit Hrs- 63.2 Total Jars- 91.6 11,220.0 11,599.0 6/16/2021 12:00 6/16/2021 13:30 1.50 INTRM1, DRILL DDRL P Drill 9 7/8''x11'' Vertical section f/ 11,599' t/ 11,643' WOB- 20-25K RPM-160 Torq.-22-26K GPM-840 On Btm PSI- 3270 Flow out- 42% ECD- 11.16 PPG P/U- 310K S/O- 172K Rot- 232K ADT-1.5 Total Bit Hrs- 64.7 Total Jars- 93.1 11,599.0 11,643.0 6/16/2021 13:30 6/16/2021 18:00 4.50 INTRM1, CASING BKRM P Circ 2 bttms up @ 11,643' w/ rotating & reciprocating pipe & racking back a stand after every 2nd bttms up t/ 11,440' GPM-850 PSI-3330 RPM-50-80 Adjusted rpm t/ mitigate shock & vibes on MWD tool 11,643.0 11,440.0 6/16/2021 18:00 6/16/2021 20:00 2.00 INTRM1, CASING CIRC P Reciprocate & rotate pipe f/ 11,440' t/ 11,369' w/ waiting mud system up f/ 10.0 ppg t/ 10.25+ ppg GPM-810 PSI-3,220 ECD-11.2 PPG RPM-60-80 Torq-21-24 11,440.0 11,369.0 6/16/2021 20:00 6/16/2021 22:00 2.00 INTRM1, CASING BKRM P Circ 2 bttms up @ 11,369' w/ rotating & reciprocating pipe & racking back a stand after every 2nd bttms up t/ 11,306' GPM-850 PSI-3330 ECD-11.2 PPG RPM-50 Adjusted rpm t/ mitigate shock & vibes on MWD tool 11,369.0 11,306.0 Rig: DOYON 25 Page 18/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/16/2021 22:00 6/17/2021 00:00 2.00 INTRM1, CASING CIRC P Attempt t/ close reamer as per SLB put down schedule. ICP- 530 GPM, Turbine RPM- 2,660, 18K torq @ 40 RPM, P/U 278K Drop 1.65'' setting ball & pump down @ 240 GPM f/ 840 strokes then drop GPM 114 f/ remaining 840 strokes. Calculated 1,680 strokes f/ ball t/ be on seat, No psi indication @ calculated strokes, Continued circulating @ 114 gpm f/ 700 more strokes with no psi indication of ball being on seat. Called SLB reamer rep & he suggested bringing RPM t/ 60 & staging pumps up intial circulating rate of 530 gpm in 10 gpm increments. Staged strokes back t/ 530 gpm & never seen any pressure spike t/ indicate ball was on seat to close reamer. FCP- 530 GPM, Turbine RPM- 2,760, 18K torq @ 40 RPM, Total strokes pumped after ball drop 4,550 No definitve indication that reamer closed 11,306.0 11,306.0 6/17/2021 00:00 6/17/2021 01:45 1.75 INTRM1, CASING CIRC P Reciprocate & rotate pipe f/ 11,306' t/ 11,216' w/ waiting mud system up f/ 10.25+ ppg t/ 10.5 ppg GPM-824 PSI-3,400 ECD-11.3 PPG RPM-60-80 Torq-21-24 Total strokes pumped 22,150 11,306.0 11,216.0 6/17/2021 01:45 6/17/2021 04:45 3.00 INTRM1, CASING BKRM P Attempt t/ SOOH w/ no success, 40K over pull observed, BROOH f/ 11,216' t/ 10,940' GPM-824-794 PSI-3300 ECD-11.3-11.4 RPM-80 Holding 275 back psi when making connections Hole packed off & torqued up 10,940' Worked pipe back down 10, 968' and re- established 11,216.0 10,940.0 6/17/2021 04:45 6/17/2021 06:00 1.25 INTRM1, CASING CIRC P Circ btms up @ 10,968' w/ reciprocating & rotating pipe f/ 10,980' t/ 10,950' GPM- 715 PSI-2577 ECD-11.37 RPM-80 Torq-22-25 10,940.0 10,968.0 Rig: DOYON 25 Page 19/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/17/2021 06:00 6/17/2021 12:00 6.00 INTRM1, CASING BKRM P BROOH f/ 10,968' t/ 10,336' GPM-715 PSI-3565 ECD-11.3-11.4 RPM-70 Torq-22K Holding 225 back psi when making connections 10,968.0 10,336.0 6/17/2021 12:00 6/17/2021 12:30 0.50 INTRM1, CASING BKRM P BROOH f/ 10,336' t/ 10,313' Wellbore packed off & stalled rotary @ 27K torq GPM-715 PSI-3565 ECD-11.3-11.4 RPM-70 Torq-22K Holding 225 back psi when making connections 10,336.0 10,313.0 6/17/2021 12:30 6/17/2021 19:00 6.50 INTRM1, CASING OTHR T Work pipe back in hole f/ 10,313' t/ 10,670' Attempting t/ regain rotary & flow Slack off weight- 75-100K Pick up weight- 325-350K SPP- 450-500 Minimal returns observed & no rotary 10,313.0 10,670.0 6/17/2021 19:00 6/17/2021 19:30 0.50 INTRM1, CASING CIRC T Regained circulation @ 10,670' GPM-115 PSI-690 Total strokes able t/ pump 306 Hole packed off and lost returns 10,670.0 10,670.0 6/17/2021 19:30 6/17/2021 22:30 3.00 INTRM1, CASING OTHR T Work pipe back in hole f/ 10,670' t/ 10,698' Attempting t/ regain rotary & flow Slack off weight- 100-125K Pick up weight- 325-350K SPP- 450-650 Regained rotary @ 10,698' RPM-15 Torq-18-20 Still no returns observed 10,670.0 10,698.0 Rig: DOYON 25 Page 20/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/17/2021 22:30 6/18/2021 00:00 1.50 INTRM1, CASING OTHR T BROOH f/ 10,698' t/ 10,680' Attempting t/ regain rotary & flow Pick up weight- 230-265K RPM-15 Torq- 18-23K SPP- 450-650 Holding 200-225 psi on backside w/ MPD Regained rotary @ 10,698' RPM-15 Torq-18-20 Still no returns observed 10,698.0 10,680.0 6/18/2021 00:00 6/18/2021 07:45 7.75 INTRM1, CASING BKRM T BROOH f/ 10,680' t/ 10,647' Attempting t/ regain rotary & flow Pick up weight- 230-265K RPM-10-20 Torq- 18-27K SPP- 450-650 Holding 200-225 psi on backside w/ MPD Regained rotary @ 10,698' RPM-15 Torq-18-20 Still no returns observed 10,680.0 10,647.0 6/18/2021 07:45 6/18/2021 09:15 1.50 INTRM1, CASING BKRM T Work pipe while attempting to regain circulation from 10,647' - 10,638' MD, pull up to 400 k, slack off to 160 k hookload. Cycle MPD back pressure from 100 psi - 500 psi while cycling standpipe pressure from 120 psi - 700 psi. Begin rotating at 10 rpm, 19 k tq. 10,647.0 10,647.0 6/18/2021 09:15 6/18/2021 12:00 2.75 INTRM1, CASING BKRM T Continue to work pipe from 10,647' - 10,629' MD, holding 250 psi back pressure on MPD. 10- 15 rpm, 18-30 k tq, continue cycling standpipe pressure from 100 psi - 700 psi. 10,647.0 10,629.0 6/18/2021 12:00 6/18/2021 16:30 4.50 INTRM1, CASING BKRM T Continue to work pipe and attempt to regain circulation from 10,629' - 10,642' MD. pulling up to 400 k, slack off to 145k hookload. Cycle MPD back pressure from 100 psi - 500 psi while cycling standpipe pressure from 120 psi - 700 psi. 10,629.0 10,629.0 6/18/2021 16:30 6/18/2021 18:45 2.25 INTRM1, CASING BKRM T Open MPD chokes and circulate across the top of the hole while attepting to regain cirulation. Work pipe from 10,629' - 10,642' MD, pull up to 400 k, slack off to 45 k hookload. Cycle standpipe pressure from 0 to 1000 psi 10,629.0 10,629.0 6/18/2021 18:45 6/19/2021 00:00 5.25 INTRM1, CASING CIRC T Began staging up pumps from 5 - 38 strokes per minute. Increased pump rate 1-2 strokes per minute as well dictated. 575 psi, 12% flow out, 10 rpm, 17 k tq. Mud weight out 11.4 ppg. 10,629.0 10,629.0 Rig: DOYON 25 Page 21/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/19/2021 00:00 6/19/2021 04:00 4.00 INTRM1, CASING CIRC T Continued to stage pumps up as well dictated from 38 spm - 135 spm (680 gpm), 2225 psi, increase rotation to 40 rpm. 17 k tq. 11.25 ppg ECD. 30.5 % flow out. 10,629.0 10,629.0 6/19/2021 04:00 6/19/2021 07:00 3.00 INTRM1, CASING BKRM T Backream out of the hole from 10,629' - 10,615' MD, 680 gpm, 2120 psi, 31% flow out, 11.13 ppg ECD, 40 rpm, 16-21 k tq, 256 k rot wt . Ream in hole to 10,660' MD to ensure no ledges created in wellbore. Backream out of the hole to 10,615' MD 10,629.0 10,615.0 6/19/2021 07:00 6/19/2021 11:00 4.00 INTRM1, CASING BKRM T Backream out of the hole from 10,615' - 10,509' MD, 793 gpm, 2600 psi, 40% flow out, 11.18 ppg ECD, 50 rpm, 18-19 k tq, 255 k rot wt. Holding 320 psi on connections with MPD. 10,615.0 10,509.0 6/19/2021 11:00 6/19/2021 19:00 8.00 INTRM1, CASING BKRM T Backream out of the hole from 10,509' - 10,313' MD, 825 gpm, 2890 psi, 40% flow out, 11.38 ppg ECD, 50 rpm, 18-19 k tq, 255 k rot wt. Holding 320 psi on connections with MPD. 10,509.0 10,313.0 6/19/2021 19:00 6/20/2021 00:00 5.00 INTRM1, CASING BKRM P Backream out of the hole from 10,313' - 10,211' MD, 825 gpm, 2890 psi, 40% flow out, 11.42 ppg ECD, 50 rpm, 18-19 k tq, 255 k rot wt. Holding 320 psi on connections with MPD. 10,313.0 10,211.0 6/20/2021 00:00 6/20/2021 06:00 6.00 INTRM1, CASING BKRM P Backream out of the hole from 10,211' - 10,070' MD, 725 gpm, 2420 psi, 37% flow out, 11.42 ppg ECD, 50 rpm, 18-19 k tq, 249 k rot wt. Holding 320 psi on connections with MPD. 10,211.0 10,070.0 6/20/2021 06:00 6/20/2021 12:00 6.00 INTRM1, CASING BKRM P Backream out of the hole from 10,070' - 9,864' MD, 730 gpm, 2440 psi, 38% flow out, 11.28 ppg ECD, 50 rpm, 18-19 k tq, 248 k rot wt. Holding 320 psi on connections with MPD. 10,070.0 9,864.0 6/20/2021 12:00 6/20/2021 13:15 1.25 INTRM1, CASING CIRC P Pump 40 bbls hi vis sweep from surface to surface while rotating and reciprocating from 9,864' - 9,769' MD, 794 gpm, 2714 psi, 38% flow out, 11.47 ppg ECD, 50 rpm, 18-19 k tq, 248 k rot wt. 13,134 strokes 9,864.0 9,769.0 6/20/2021 13:15 6/20/2021 14:00 0.75 INTRM1, CASING OWFF P Observe well for flow (static) 9,769.0 9,769.0 6/20/2021 14:00 6/20/2021 16:00 2.00 INTRM1, CASING CIRC P Increase mud weight to 10.8 ppg while rotatating and reciprocating from 9,769' - 9,675' MD, began circulating at 780 gpm, 2630 psi, 38% flow out, 11.45 ppg ECD, reduced pump rate for ECD as heavy mud came up the backside, final circulating rate 600 gpm, 1820 psi, 31% flow out, 11.49 ppg ECD. 50 rpm, 18-19 k tq, 248 k rot wt. 9,769.0 9,675.0 6/20/2021 16:00 6/20/2021 22:00 6.00 INTRM1, CASING BKRM P Attempt to SOOH, observed immediate 30k overpull, continue backreaming out of the hole 9,675' - 8,824' MD, 600 gpm, 1730 psi, 29% flow out, 11.59 ppg ECD, 90 rpm, 18-19 k tq, 232 k rot wt. Holding 300 psi on connections with MPD. 9,675.0 8,824.0 Rig: DOYON 25 Page 22/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/20/2021 22:00 6/21/2021 00:00 2.00 INTRM1, CASING BKRM P Perform MAD pass while backreaming out of the hole 8,824' - 8,686' MD, 600 gpm, 1630 psi, 27% flow out, 11.53 ppg ECD, 90 rpm, 18-19 k tq, 228 k rot wt. Holding 300 psi on connections with MPD. 8,824.0 8,686.0 6/21/2021 00:00 6/21/2021 00:45 0.75 INTRM1, CASING BKRM P Perform MAD pass while backreaming out of the hole 8,686' - 8,635' MD, 600 gpm, 1630 psi, 27% flow out, 11.53 ppg ECD, 60 rpm, 17 k tq, 225 k rot wt. Holding 300 psi on connections with MPD. 8,686.0 8,635.0 6/21/2021 00:45 6/21/2021 01:15 0.50 INTRM1, CASING STRP P Strip out of the hole f/ 8,635' - 8,549' MD, 320 k Up Wt, observed 40 k overpull at 8,549' MD, ran in hole to 8,584' MD, 132 k So Wt, pick up and attempt to pass overpull. (unsuccessful). Ran in the hole to 8,635' MD. 8,635.0 8,635.0 6/21/2021 01:15 6/21/2021 06:00 4.75 INTRM1, CASING BKRM P Backream out of the hole 8,635' - 8,212' MD, 570 gpm, 1550 psi, 24% flow out, 11.55 ppg ECD, 90 rpm, 15 k tq, 205 k rot wt. Holding 300 psi on connections with MPD. 8,635.0 8,212.0 6/21/2021 06:00 6/21/2021 12:00 6.00 INTRM1, CASING BKRM P Backream out of the hole 8,212' - 7,630' MD, 655 gpm, 1840 psi, 32% flow out, 11.69 ppg ECD, 85 rpm, 16 k tq, 200 k rot wt. Holding 300 psi on connections with MPD. 8,212.0 7,630.0 6/21/2021 12:00 6/21/2021 18:00 6.00 INTRM1, CASING BKRM P Backream out of the hole 7,630' - 7,287' MD, 660 gpm, 1870 psi, 32% flow out, 11.86 ppg ECD, 75 rpm, 17 k tq, 200 k rot wt. Holding 300 psi on connections with MPD. 7,630.0 7,287.0 6/21/2021 18:00 6/22/2021 00:00 6.00 INTRM1, CASING BKRM P Backream out of the hole 7,287' - 6,941' MD, 635 gpm, 1670 psi, 29% flow out, 11.9 ppg ECD, 75 rpm, 13 k tq, 180 k rot wt. Holding 300 psi on connections with MPD. 7,287.0 6,941.0 6/22/2021 00:00 6/22/2021 05:45 5.75 INTRM1, CASING BKRM P Backream out of the hole from 6,941' - 6,738' MD, 635 gpm, 1670 psi, 29% flow out, 11.9 ppg ECD, 75 rpm, 13 k tq, 180 k rot wt. Holding 300 psi on connections with MPD. Performed 260 bbl fresh mud sweep at 6,790' MD, hole unloaded fine silts, sands and clays. 6,941.0 6,738.0 6/22/2021 05:45 6/22/2021 08:00 2.25 INTRM1, CASING CIRC P Circulate 2 bottoms up while backreaming out of the hole from 6,738' - 6,655' MD, 650 gpm, 1865 psi, 29% flow out, 11.9 ppg ECD, 75 rpm, 13 k tq, 179 k rot wt. Holding 300 psi on connections with MPD. 6,738.0 6,655.0 6/22/2021 08:00 6/22/2021 11:15 3.25 INTRM1, CASING STRP P Strip out of the hole from 6,655' - 3,835' MD. 250 k Up Wt, 143 k Dn Wt. Hold 275 psi back pressure with MPD. 6,655.0 3,835.0 6/22/2021 11:15 6/22/2021 12:30 1.25 INTRM1, CASING CIRC P Circulate 2 bottoms up while rotating and reciprocating from 3,835' - 3,735' MD, 900 gpm, 2460 psi, 47% flow out, 11.91 ppg ECD, 80 rpm, 6 k tq, 142 k rot wt. 3,835.0 3,735.0 6/22/2021 12:30 6/22/2021 13:15 0.75 INTRM1, CASING PMPO P Pump out of the hole from 3,735' - 3,548' MD, observed momentary 6 k hookload increase as the reamer entered the shoe, 900 gpm, 2440 psi, 47 % flow out, 11.81 ppg ECD. 151 k Up Wt. 3,735.0 3,548.0 Rig: DOYON 25 Page 23/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/22/2021 13:15 6/22/2021 13:30 0.25 INTRM1, CASING OWFF P Observe well for flow (static) 3,548.0 3,548.0 6/22/2021 13:30 6/22/2021 14:30 1.00 INTRM1, CASING MPDA P Remove RCD and install trip nipple per MPD rep. 3,548.0 3,548.0 6/22/2021 14:30 6/22/2021 16:00 1.50 INTRM1, CASING TRIP P Trip out of the hole from 3,548' - 624' MD, 77 k Up Wt, 65 k Dn Wt, monitored hole fill on Pit #2 3,548.0 624.0 6/22/2021 16:00 6/22/2021 16:30 0.50 INTRM1, CASING OWFF P Observe well for flow (static), Pull PS- 21's and install master bushings. 624.0 624.0 6/22/2021 16:30 6/22/2021 20:30 4.00 INTRM1, CASING BHAH P Lay down BHA per Baker DD and MWD. 624.0 0.0 6/22/2021 20:30 6/22/2021 21:30 1.00 INTRM1, CASING OTHR P Pull the wear ring per FMC rep. 0.0 0.0 6/22/2021 21:30 6/22/2021 22:45 1.25 INTRM1, CASING CLEN P Clean and clear the rig floor Simops - change upper rams to 7-5/8" solid body rams. 0.0 0.0 6/22/2021 22:45 6/23/2021 00:00 1.25 INTRM1, CASING RURD P Install the test plug per FMC rep, rig up to test BOPE with 7-5/8" and 4" test joints. 0.0 0.0 6/23/2021 00:00 6/23/2021 04:45 4.75 INTRM1, WHDBOP BOPE P Test BOPE all tests 250 psi low for 5 min, 3,500 psi high for 10 minutes each with 7 5/8" - test annular and 7-5/8" UPR, with 4” – test annular and 2-7/8”x5 -1/2” LPR, test choke valves 1-15, manual and super choke, choke and kill manual's and HCR's, 4" valve on kill line, 2 x 4" FOSV, 1 x 4” IBOP dart valve, 1 x 5” FOSV, 1 x 5” IBOP dart valve, upper and lower IBOP, blind/shear rams. Perform Koomey drawdown, ACC=2900 psi, manifold=1450 psi initial. After all functions, accumulator=1800 psi, 15 secs to 200 psi with two electric pumps, 73 secs to build to full system pressure with two electric and two air pumps. Closing times, annular=23 secs, UPR=18 secs, blind/shears=16 secs, LPR=16 secs, choke HCR=2 secs, kill HCR=2 secs. 6 Nitrogen bottles back-up avg=1883 psi, CPAI witnessed. Tested PVT, gain/loss, flow out, LEL and H2S alarms. AOGCC Rep Guy Cook waived witness via email on 6/23/21 @ 09:23, BLM Rep Quinn Sawyer witnessed test. 0.0 0.0 6/23/2021 04:45 6/23/2021 05:30 0.75 INTRM1, CASING RURD P Pulled the test plug, rig down and blow down lines and testing equipment. 0.0 0.0 6/23/2021 05:30 6/23/2021 06:30 1.00 INTRM1, CASING RURD P Rig up to run 7-5/8" Intermediate casing 0.0 0.0 6/23/2021 06:30 6/23/2021 08:15 1.75 INTRM1, CASING PUTB P Pick up 7-5/8" shoe track and test floats (good) Removed collar on joint #3 to bakerlok. Top hat placed on top of float collar. Witnessed by COP. Baffle collar placed after jnt #4 - setting depth of 11,501'. Witnessed by COP. 0.0 171.0 Rig: DOYON 25 Page 24/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/23/2021 08:15 6/23/2021 17:00 8.75 INTRM1, CASING PUTB P Pick up and run 7-5/8" 33.7# L-80 TXP casing f/ 171' - t/ 3,629' MD. 158 k Up Wt, 151 k Dn Wt. Monitor displacement on pit #2. ES Cementer picked up after jnt. 70. 6 pins (3300 psi) verified by HES and witnessed by COP. Setting depth 8,756'. 171.0 3,629.0 6/23/2021 17:00 6/23/2021 20:30 3.50 INTRM1, CASING PUTB P Make up crossover joint and continue running in the with 7-5/8" 29.7# L-80 HYD563 casing f/ 3,629' - t/ 5,251' MD. 162 k Up Wt, 148 k Dn Wt. Monitor displacement on pit #2 3,629.0 5,251.0 6/23/2021 20:30 6/23/2021 22:45 2.25 INTRM1, CASING CIRC P Stage pumps up to 5.5 bbls/min and circulate bottoms up, 142 psi, 15% flow out, 209 k Up Wt, 170 k Dn Wt. Observed 11.2 ppg MW out during circulation 5,251.0 5,251.0 6/23/2021 22:45 6/24/2021 00:00 1.25 INTRM1, CASING PUTB P Continue running in the with 7-5/8" 29.7# L-80 HYD563 casing f/5,251' - t/ 5,782' MD. 160 k Dn Wt. Monitor displacement on pit #2 5,251.0 5,782.0 6/24/2021 00:00 6/24/2021 02:00 2.00 INTRM1, CASING PUTB P Continue running in the with 7-5/8" 29.7# L-80 HYD563 casing f/5,782' - t/ 6,644' MD. 152 k Dn Wt. Monitor displacement on pit #2 5,782.0 6,644.0 6/24/2021 02:00 6/24/2021 04:00 2.00 INTRM1, CASING CIRC P Stage up pumps to 6 bbls/min and circulated bottoms up while reciprocating f/ 6,644' - t/ 6,680' MD, 250 psi, 17% flow out, 244 k Up Wt, 174 k Dn Wt. Observed 11.5 ppg MW out of the hole 6,644.0 6,680.0 6/24/2021 04:00 6/24/2021 10:45 6.75 INTRM1, CASING PUTB P Continue running in the with 7-5/8" 29.7# L-80 HYD563 casing f/6,680' - t/ 9,871' MD. 193 k Dn Wt. Monitor displacement on pit #2 6,680.0 9,871.0 6/24/2021 10:45 6/24/2021 13:00 2.25 INTRM1, CASING CIRC P Stage up pumps to 6 bbls/min and circulated bottoms up while slacking off f/ 9,871' - t/ 9,905' MD, 214 psi, 15% flow out, 244 k Up Wt, 174 k Dn Wt. Observed 11.2 ppg MW out of the hole. 9,871.0 9,905.0 6/24/2021 13:00 6/25/2021 00:00 11.00 INTRM1, CASING PUTB P Continue running in the with 7-5/8" 29.7# L-80 HYD563 casing f/9,905' - t/ 11,367' MD. 150 k Dn Wt. Monitor displacement on pit #2 Began easing casing in the hole between 40 - 400 ft/hr starting at 10,537' MD 9,905.0 11,367.0 6/25/2021 00:00 6/25/2021 06:00 6.00 INTRM1, CASING PUTB P Continue running in the hole with 7-5/8" 29.7# L-80 HYD563 casing f/11,367' - t/ 11,486' MD. 114 k Dn Wt. Monitor displacement on pit #2 Easing casing in the hole between 20 - 50 ft/hr. 11,367.0 11,486.0 6/25/2021 06:00 6/25/2021 12:00 6.00 INTRM1, CASING PUTB P Continue running in the hole with 7-5/8" 29.7# L-80 HYD563 casing f/11,486' - t/ 11,538' MD. 114 k Dn Wt. Monitor displacement on pit #2 Easing casing in the hole between 20 - 30 ft/hr. 11,486.0 11,538.0 Rig: DOYON 25 Page 25/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/25/2021 12:00 6/25/2021 18:00 6.00 INTRM1, CASING PUTB P Continue running in the hole with 7-5/8" 29.7# L-80 HYD563 casing f/11,538' - t/ 11,560' MD. Begin applying 30 k tq while working the string down. Picking up to 270 k, slacking off to 50 k. Attempted to circulate, 3 spm 733 psi, 5 spm, 1019 psi 11,538.0 11,560.0 6/25/2021 18:00 6/26/2021 00:00 6.00 INTRM1, CASING PUTB T Continue working the 7-5/8" 29.7# L-80 HYD563 casing in the hole f/11,560' - t/ 11,565' MD. Pump at 3 spm ICP 1100 psi, pressure slowly fell to 700 psi. Working string up to 475 k, slacking off to 50 k. 11,560.0 11,565.0 6/26/2021 00:00 6/26/2021 06:00 6.00 INTRM1, CASING PUTB T Continue working the 7-5/8" 29.7# L-80 HYD563 casing in the hole f/11,565' - t/ 11,573' MD. Pumping at 3 spm, 550 psi - 800 psi 11,565.0 11,573.0 6/26/2021 06:00 6/26/2021 12:00 6.00 INTRM1, CASING PUTB T Apply 30 k tq and continue working 7- 5/8" casing in the hole f/ 11,573' - t/ 11,619' MD, picking up to 350 k and slacking off to 45 k, pump at 3 spm, 240 psi, 4 spm, 420 psi. 11,573.0 11,619.0 6/26/2021 12:00 6/26/2021 18:00 6.00 INTRM1, CASING PUTB T Continue working 7-5/8" casing in the hole with 30 k tq f/ 11,619' - t/ 11,628' MD, picking up to 350 k and slacking off to 45 k pump at 5 spm, 670 psi. Begin reducing MW to 10.6 ppg. 11,619.0 11,628.0 6/26/2021 18:00 6/27/2021 00:00 6.00 INTRM1, CASING CIRC P Ciculate bottoms up at 1 bbl/min ICP = 920 psi, FCP = 540 psi, 1.6% flow out. 11.4 ppg MW out of the hole. Working pipe up to 350 k and slacking off to 180 k with 30 k tq. 11,628.0 11,628.0 6/27/2021 00:00 6/27/2021 06:00 6.00 INTRM1, CASING CIRC P Continue staging up pumps to 2 bbls min while working pipe up to 350 k and slacking off to 180 k with 30 k tq, 580 psi, observed signs of packoff, slow pump rate to 1 bbl/min and regained circulation. Quit working pipe and release tq, pressure fell to 450 psi, stage up pumps to 2.5 bbls min, 470 psi 11,628.0 11,628.0 6/27/2021 06:00 6/27/2021 12:00 6.00 INTRM1, CASING CIRC P Continue circulating, rotating and reciprocating 7-5/8" casing with 84 GPM, PU up to 350k and torque 30k ft- lbs. Encountered pack-off at 120 GPM. Regained circulation and continued staging up pumps. 11,628.0 11,628.0 6/27/2021 12:00 6/27/2021 18:00 6.00 INTRM1, CASING CIRC P Continue circulating, rotating and reciprocating 7-5/8" casing with180 GPM, PU up to 350k and torque 30k ft- lbs. Encountered pack-offs, worked through and continued staging up pumps. 11,628.0 11,628.0 6/27/2021 18:00 6/27/2021 18:45 0.75 INTRM1, CASING CIRC P Continue circulating, rotating and reciprocating 7-5/8" casing with 180 GPM, PU up to 350k and torque 30k ft- lbs. Encountered pack-offs, worked through and continued staging up pumps. 11,628.0 11,628.0 Rig: DOYON 25 Page 26/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/27/2021 18:45 6/27/2021 19:15 0.50 INTRM1, CASING RURD P Blow down top drive and rig up cement line. 11,628.0 11,628.0 6/27/2021 19:15 6/27/2021 23:00 3.75 INTRM1, CASING CIRC P Continue circulating and reciprocating 7- 5/8" casing with 180 GPM, PU up to 475 k, stage pumps to 190 gpm, 214 psi. Slack off to set depth - 265 k hookload. 11,628.0 11,624.0 6/27/2021 23:00 6/28/2021 00:00 1.00 INTRM1, CEMENT CMNT P SLB pump 5 bbls of fresh H2O. Tested lines to 650 psi low/ 3900 psi high, pump 60.1 bbls of 11.5 ppg Mud Push II @ 2.5 bbls/min, 195 psi, Dropped bottom (bypass) plug. (cement wet @ 23:49) Begin pumping 15.8 ppg Class G cement @ 2.7 bpm, 204 psi. 11,624.0 11,624.0 6/28/2021 00:00 6/28/2021 09:00 9.00 INTRM1, CEMENT CMNT P Continue pumping total of 61.1 bbls of Class G 15.8 ppg cement @ 2.8 bbls/min, ICP = 204 psi, FCP = 130 psi. Drop top (shutoff) plug & kick out with 20 bbls of fresh H2O. Swap to rig & displace w/ 10.6 ppg LSND mud @ 4.8 bbls/min, 75 psi. Slow pumps to 3 bpm at 3694 stks, at 3717 stks observed pressure build to 908 psi, shut down pumps and work pipe, continue displacing cement at .25 to 1 bpm, plug bump at 4275 stks (505 bbls + 20 bbls = 525 bbls), lost 10 bbls of cement during displacement. FCP=1875 psi. CIP 08:25 hrs 06/28/2021. Bled pressure and checked floats. (good) 11,624.0 11,624.0 6/28/2021 09:00 6/28/2021 12:00 3.00 INTRM1, CEMENT CIRC P Pressure up on casing to open the cement stage collar, observe open at 3214 psi. Circulate and condition mud for second stage cement job, 248 gpm, 255 psi. 11,624.0 11,624.0 6/28/2021 12:00 6/28/2021 14:15 2.25 INTRM1, CEMENT CMNT P SLB pump 55.4 bbls of 11.5 ppg Mud Push II @ 4.5 bbls/min, 450 psi. Batch cement, (cement wet @ 12:23) Pump 51.2bbls of 15.8 ppg Class G cement @ 3.8 bpm, 443 psi, Drop closing plug & kick out with 20 bbls of fresh H2O. Swap to rig & displace w/ 10.6 ppg LSND mud @ 6 bbls/min, 425 psi. Slow pumps to 2 bpm at 3150 stks, plug bump at 3193 stks (377 bbls + 20bbls = 397 bbls) FCP= 251 psi. CIP 13:56 hrs 06/28/2021. Increase pressure to 1831 psi and close the cement stage collar. Bled off pressure and checked for flow (static). 11,624.0 0.0 6/28/2021 14:15 6/28/2021 15:15 1.00 INTRM1, CEMENT OWFF P Observed well for flow for 30 min, blow down cement lines and rig down, lay down Volant tool. 0.0 0.0 6/28/2021 15:15 6/28/2021 20:00 4.75 INTRM1, CEMENT WOC P Wait on cement to reach 100 psi compressive strength. Service the top drive, clean out cement line valves, change mud pump liners to 5.5". 0.0 0.0 6/28/2021 20:00 6/29/2021 00:00 4.00 INTRM1, CEMENT WOC P Continue waiting on cement to reach 100 psi compressive strength. Lay down 4 stands of 5" HWDP and 14 stands of 5" DP. 0.0 0.0 6/29/2021 00:00 6/29/2021 04:00 4.00 INTRM1, CEMENT WOC P Continue waiting on cement to reach 100 psi compressive strength. Simops - continue laying down 5" DP, prepare for splitting the stack. 0.0 0.0 Rig: DOYON 25 Page 27/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/29/2021 04:00 6/29/2021 05:30 1.50 INTRM1, WHDBOP NUND P Installed 9 ft pup joint on top of the casing, picked up to 36ft on joint #286. removed the PS-21's, trip nipple and MPD clamp. Split stack between casing and tubing spool, removed studs from tubing spool for clearance. 0.0 0.0 6/29/2021 05:30 6/29/2021 10:30 5.00 INTRM1, WHDBOP WWSP P Installed emergency slips, slack of and hang casing, 382 k hookload. Installed Wachs casing cutter, cut 1.86 ft off the top of joint #285 and dressed for packoff. Simops - changed upper rams to 2-7/8" x 5-1/2" VBR's. 0.0 0.0 6/29/2021 10:30 6/29/2021 11:30 1.00 INTRM1, WHDBOP NUND P Installed studs on tubing spool and nipple up stack. Installed the Orbit valve, RCD clamp, and the trip nipple. 0.0 0.0 6/29/2021 11:30 6/29/2021 14:30 3.00 INTRM1, WHDBOP WWSP P Install packoff with stand of 5" DP, run in lock down srews, test pack off to 3822 psi for 10 min (good test). Pull packoff running tool, set test plug. 0.0 0.0 6/29/2021 14:30 6/29/2021 16:30 2.00 INTRM1, WHDBOP OTHR P Changed the saver sub on the top drive to XT39. 0.0 0.0 6/29/2021 16:30 6/29/2021 18:30 2.00 INTRM1, WHDBOP SLPC P Slip and cut 116 ft of drilling line. Perform post slip and cut calibrations on Pason and Amphion. 0.0 0.0 6/29/2021 18:30 6/30/2021 00:00 5.50 INTRM1, WHDBOP BOPE P Test BOPE all tests 250 psi low for 5 min, 3,500 psi high for 10 minutes each with 4" - test annular and 2 7/8" x 5 1/2" UPR and LPR, test choke valves 1-15, manual and super choke, choke and kill manual's and HCR's, 4" valve on kill line, 2 x 4" FOSV, 1 x 4” IBOP dart valve, upper and lower IBOP, blind/shear rams. Perform Koomey drawdown, ACC=3000 psi, manifold=1500 psi initial. After all functions, accumulator=1700 psi, 12 secs to 200 psi with two electric pumps, 76 secs to build to full system pressure with two electric and two air pumps. Closing times, annular=23 secs, UPR=18 secs, blind/shears=16 secs, LPR=16 secs, choke HCR=2 secs, kill HCR=2 secs. 6 Nitrogen bottles back-up avg=1883 psi, CPAI witnessed. Tested PVT, gain/loss, flow out, LEL and H2S alarms. AOGCC Rep Adam Earl waived witness at 11:10 hrs 6/23/2021. 0.0 0.0 6/30/2021 00:00 6/30/2021 02:00 2.00 INTRM1, WHDBOP BOPE P Continue testing BOPE all tests to 250 psi low for 5 min and 3500 psi high for 10 min. With 4-1/2" - test annular and 2- 7/8" x 5-1/2" upper and lower VBR's. AOGCC Rep Adam Earl waived witness at 11:10 hrs 6/23/2021. 0.0 0.0 6/30/2021 02:00 6/30/2021 03:00 1.00 INTRM1, WHDBOP MPDA P Pull trip nipple and install MPD test cap, fill lines and purge air, test MPD system, rig down testing equipment, install trip nipple and hole fill lines. 0.0 0.0 6/30/2021 03:00 6/30/2021 04:00 1.00 INTRM1, WHDBOP OTHR P Pull the test plug and install the 8.75" wearring per FMC rep. Clean and clear floor, dress PS-21's. 0.0 0.0 6/30/2021 04:00 6/30/2021 05:30 1.50 INTRM1, DRILLOUT CLEN P Pick up BHA#4 clean out assembly per Baker DD and SLB LWD reps. 0.0 289.0 Rig: DOYON 25 Page 28/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/30/2021 05:30 6/30/2021 13:00 7.50 INTRM1, DRILLOUT TRIP P Trip in the hole with 4" singles and 4" doubles f/ 289' - t/ 6,488' MD, 125 k Up Wt, 108 k Dn Wt. Fill pipe every 20 stands / monitor displacement on trip pit #2. Obtain free ring f/ 4,994' - t/ 5,057' MD. Simops - Perform annular LOT t/15.8 ppg EMW (840 psi) and flush with 450 bbls of fresh water, 2.5 bbls/min, 1000 psi. 289.0 6,488.0 6/30/2021 13:00 6/30/2021 15:30 2.50 INTRM1, DRILLOUT DLOG P Log for top of cement with f/ 6,488' - 8409, 1800 ft/hr. 175 k Up Wt, 135 k Dn Wt. 6,488.0 8,409.0 6/30/2021 15:30 6/30/2021 17:00 1.50 INTRM1, DRILLOUT DLOG P Wash in the hole while logging for cement f/ 8,409' - t/ 8,729' MD, 35 rpm, 6 k tq, 260 gpm, 1190 psi. 8,409.0 8,729.0 6/30/2021 17:00 6/30/2021 18:00 1.00 INTRM1, DRILLOUT PRTS P LD double, rig up and attempt to test casing. (unsuccessful) 8,729.0 8,722.0 6/30/2021 18:00 6/30/2021 19:30 1.50 INTRM1, DRILLOUT CIRC P Circulate surface to surface, 350 gpm, 2143 psi, 26% flow out, 8,722.0 8,722.0 6/30/2021 19:30 6/30/2021 20:15 0.75 INTRM1, DRILLOUT PRTS P Test casing to 3500 psi for 30 min charted (good test) 8,722.0 8,722.0 6/30/2021 20:15 6/30/2021 21:30 1.25 INTRM1, DRILLOUT TRIP T Trip out of the hole on elevators f/ 8,722' - t/ 8,250' MD, pump 20 bbl dry job and let fall. Simops - scafold crew measure for rig up. 8,722.0 8,250.0 6/30/2021 21:30 6/30/2021 22:30 1.00 INTRM1, DRILLOUT TRIP T Trip out of the hole f/ 8,250' - t/ 6,361' MD, 150 k Up Wt, 120 k Dn Wt. Monitor hole fill on pit #2. 8,250.0 6,361.0 6/30/2021 22:30 6/30/2021 23:00 0.50 INTRM1, DRILLOUT SVRG T Service the rig, service and inspect drawworks. 6,361.0 6,361.0 6/30/2021 23:00 7/1/2021 00:00 1.00 INTRM1, DRILLOUT TRIP T Trip out of the hole f/ 6,361' - t/ 4,474' MD, 114 k Up Wt, 104 k Dn Wt. Monitor hole fill on pit #2. 6,361.0 4,474.0 7/1/2021 00:00 7/1/2021 02:00 2.00 INTRM1, DRILLOUT TRIP T Trip out of the hole f/ 4,474' - t/ 286' MD. Monitor hole fill on pit #2. Simops - Perform annular LOT t/13.5 ppg EMW (820 psi) and finish flush with 35.5 bbls of fresh water, 2.3 bbls/min, 1000 psi. 4,474.0 286.0 7/1/2021 02:00 7/1/2021 03:15 1.25 INTRM1, DRILLOUT BHAH T LD BHA per Baker DD and SLB LWD reps Simops - Freeze protect 13-3/8" x 7-5/8" annulus wit 116 bbls diesel, 2 bbls/min, 960 psi. 286.0 0.0 7/1/2021 03:15 7/1/2021 07:00 3.75 INTRM1, DRILLOUT RGRP T Clear and clean the rig floor, wash topdrive in preparation for motor change out, prepare for scaffolding, begin unplugging electrical connections. 0.0 0.0 7/1/2021 07:00 7/1/2021 11:00 4.00 INTRM1, DRILLOUT RGRP T Make up 5' pup jt to the top and set in slips, Pick up scaffolding to the rig floor and build work platform around the top drive. 0.0 0.0 7/1/2021 11:00 7/1/2021 12:00 1.00 INTRM1, DRILLOUT RGRP T Separate blocks from the topdrive, run OHLM test on the traction motor. bring new traction motor to the rig floor. 0.0 0.0 Rig: DOYON 25 Page 29/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/1/2021 12:00 7/2/2021 00:00 12.00 INTRM1, DRILLOUT RGRP T Remove traction motor from the topdrive, transfer equipment from old motor to new motor, rewire leads, set new motor in place and install, check rotation and ID motor per NOV rep. Yoke topdrive to the blocks. 0.0 0.0 7/2/2021 00:00 7/2/2021 02:00 2.00 INTRM1, DRILLOUT RGRP T Secured remaining hardware on the topdrive. Inspected the derrick for any loose tools or equipment, rigged down scaffolding and removed from rig floor Cycled the topdrive through the derrick to ensure proper alignment of cables. Adjusted electrical wiring between weight bucket and traction motor. Pull and lay down 5 ft pup joint 0.0 0.0 7/2/2021 02:00 7/2/2021 03:00 1.00 INTRM1, DRILLOUT BHAH T Installed PS-21 bowl inserts, opened the kill line, open the blind rams. Pick up BHA#5 per Baker DD and SLB LWD reps. 48 k Up Wt, 52 k Dn Wt. 0.0 286.0 7/2/2021 03:00 7/2/2021 06:00 3.00 INTRM1, DRILLOUT TRIP T Trip in the hole f/ 286' - t/ 6,543' MD, monitor displacement on trip pit #2, (Free ring f/ 3,895' - t/ 4,075' MD. 286.0 6,543.0 7/2/2021 06:00 7/2/2021 08:30 2.50 INTRM1, DRILLOUT DLOG T Log cement at 1800 fph f/ 6,543' - t/ 8,729' MD, 178 k Up Wt, 142 k So Wt. Began washing in the hole at 8,536' MD, 270 gpm, 1320 psi. 6,543.0 8,729.0 7/2/2021 08:30 7/2/2021 12:00 3.50 INTRM1, DRILLOUT DRLG P Drill cement f/ 8,729' - t/ 8,747' MD, drill cement stage collar f/ 8,747' - t/ 8,751' MD, 270 gpm, 1240 psi, 15% flow out, 5 -15 k wob, 50-80 rpm, 5-12 k tq, 178 k Up Wt, 142 k Dn Wt, 157 k Rot Wt. Continue washing in the hole t/ 8,851' MD. Worked string mill through cement stage collar 3 times. Began reducing mud weight to 10.3 ppg. 8,729.0 8,851.0 7/2/2021 12:00 7/2/2021 12:30 0.50 INTRM1, DRILLOUT SVRG P Grease the blocks, service the wash pipe on the top drive, install grease plugs on the traction motor. 8,851.0 8,851.0 7/2/2021 12:30 7/2/2021 18:30 6.00 INTRM1, DRILLOUT DLOG P Continue logging cement at 1800 fph f/ 8,851' - t/ 11,486' MD, 235 k Up Wt, 180 k Dn Wt. Began washing down at 10,560' MD, 270 gpm, 1500 psi, 15% flow out, 80 rpm, 10 k tq. Observed cement stringers at 11,356' MD and 11,440' MD 8,851.0 11,486.0 7/2/2021 18:30 7/2/2021 19:30 1.00 INTRM1, DRILLOUT CIRC P Lay down single, circulate bottom up while rotating and reciprocating, 350 gpm, 2330 psi, 19 % flow out, 20 rpm, 12 k tq, 245 k Up Wt, 150 k Dn Wt, 180 k Rot Wt. 11,486.0 11,475.0 7/2/2021 19:30 7/2/2021 20:30 1.00 INTRM1, DRILLOUT PRTS P Rig up and test casing to 3500 psi for 30 min (good test). Rig down equipment. 11,475.0 11,475.0 7/2/2021 20:30 7/3/2021 00:00 3.50 INTRM1, DRILLOUT TRIP P Trip out of the hole f/ 11,475' - t/ 5,621' MD, 146 k Up Wt, 96 k Dn Wt. Monitor hole fill on trip pit #2. Pumped 20 bbls 11.8 ppg dry job at 11,003' MD 11,475.0 5,621.0 7/3/2021 00:00 7/3/2021 02:30 2.50 INTRM1, DRILLOUT TRIP P Continue tripping out of the hole f/ 5,621' - t/ 286' MD, 48 k Up Wt, 52 k Dn Wt. Monitor hole fill on trip pit #2. 5,621.0 286.0 7/3/2021 02:30 7/3/2021 03:30 1.00 INTRM1, DRILLOUT BHAH P Observe well for flow, LD BHA #5. 286.0 0.0 Rig: DOYON 25 Page 30/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/3/2021 03:30 7/3/2021 04:00 0.50 INTRM1, DRILLOUT CLEN P Clear and clean rig floor of BHA#5 components, load floor and prep for BHA#6. 0.0 0.0 7/3/2021 04:00 7/3/2021 08:30 4.50 INTRM1, DRILLOUT BHAH P Pick up BHA#6 per Baker DD and MWD to 343' MD. 60 k Up Wt, 62 k Dn Wt. 0.0 343.0 7/3/2021 08:30 7/3/2021 12:00 3.50 INTRM1, DRILLOUT TRIP P Trip in the hole f/ 343' - t/ 6,030' MD, 154 k Up Wt, 112 k Dn Wt, Fill pipe every 20 stands, monitor displacement on trip pit #2. 343.0 6,030.0 7/3/2021 12:00 7/3/2021 15:30 3.50 INTRM1, DRILLOUT TRIP P Continue tripping in the hole f/ 6,060' - t/ 11,434' MD, 260 k Up Wt, 129 k Dn Wt. Fill pipe every 20 stands, monitor displacement on trip pit #2 6,030.0 11,434.0 7/3/2021 15:30 7/3/2021 16:30 1.00 INTRM1, DRILLOUT SLPC P Slip and cut 67' drilling line, calibrate Amphion, Pason, and Baker sensors 11,434.0 11,434.0 7/3/2021 16:30 7/3/2021 21:30 5.00 INTRM1, DRILLOUT DRLG P Wash down and tag cement at 11,486' MD, drill shoe track and 20 ft of new hole to 11,663' MD, 240 gpm, 1800 psi, 12% flow out, 10-15 k wob, 70 rpm, 15 k tq, 260 Up Wt, 140 k Dn Wt, 180 k Rot wt. Tag baffle collar at 11,493', tag float collar at 11,536', tag shoe at 11,621' MD. Reduce MW f/ 10.3 ppg t/ 10.0 ppg 11,434.0 11,663.0 7/3/2021 21:30 7/3/2021 23:00 1.50 INTRM1, DRILLOUT CIRC P Circulate bottom up while rotating and reciprocating, 230 gpm, 1630 psi, 13% flow out, 70 rpm, 14 k tq, 258 k Up Wt, 154 k Dn Wt, 198 k Rot wt. Pull into the shoe to 11,595' MD. 11,663.0 11,595.0 7/3/2021 23:00 7/3/2021 23:30 0.50 INTRM1, DRILLOUT LOT P Rig up and perform LOT 11,595.0 11,595.0 7/3/2021 23:30 7/4/2021 00:00 0.50 INTRM1, DRILLOUT MPDA P Prepare for MPD bearing installation. 11,595.0 11,595.0 7/4/2021 00:00 7/4/2021 01:15 1.25 INTRM1, DRILLOUT MPDA P Pull trip nipple and install the RCD. 11,595.0 11,595.0 7/4/2021 01:15 7/4/2021 01:45 0.50 INTRM1, DRILLOUT LOT P Rig up and perform LOT to 15.0 ppg EMW. 11,595.0 11,595.0 7/4/2021 01:45 7/4/2021 06:00 4.25 PROD1, DRILL DDRL P Wash in the hole and displace to 9.0 ppg FloPro while drilling 6.5" production hole f/ 11,663' - t/ 11,816' MD, 8,347' TVD, 13 k wob, 230 gpm, 1380 psi, 12.5 % flow out, 9.88 ppg ECD, 100 rpm, 9 k tq. ADT = 2.8 hrs, Bit hours = 3.1 Control drilling at 50 ft/hr for LWD data density 11,595.0 11,816.0 7/4/2021 06:00 7/4/2021 12:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 11,816' - 12,031' MD, 8,376' TVD, 6 k wob, 250 gpm, 1540 psi, 13% flow out, 120 rpm, 7 k tq, 9.74 ppg ECD, 212 k Up Wt, 162k So Wt, 194 k Rot Wt. ADT = 4.5, total bit hrs = 7.6 Control drilling at 50 ft/hr for LWD data density 11,816.0 12,031.0 Rig: DOYON 25 Page 31/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/4/2021 12:00 7/4/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 12,031' - 12,296' MD, 8,400' TVD, 12 k wob, 240 gpm, 1520 psi, 14% flow out, 120 rpm, 8 k tq, 9.73 ppg ECD, 212 k Up Wt, 162k So Wt, 194 k Rot Wt. ADT = 5.6, total bit hrs = 13.2 Control drilling at 50 ft/hr for LWD data density 12,031.0 12,296.0 7/4/2021 18:00 7/5/2021 00:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 12,296' - 12,521' MD, 8,409' TVD, 14 k wob, 240 gpm, 1550 psi, 14% flow out, 120 rpm, 7 k tq, 9.75 ppg ECD, 212 k Up Wt, 162k So Wt, 194 k Rot Wt. ADT = 5.2, total bit hrs = 18.4 Control drilling at 50 ft/hr for LWD data density 12,296.0 12,521.0 7/5/2021 00:00 7/5/2021 01:30 1.50 PROD1, DRILL DDRL P Drill 6.5" production hole from 12,521' - 12,560' MD, 8,412' TVD, 8 k wob, 240 gpm, 1560 psi, 13% flow out, 100 rpm, 7 k tq, 9.42 ppg ECD, 214 k Up Wt, 162k So Wt, 178 k Rot Wt. ADT = .8, total bit hrs = 19.2 Control drilling at 50 ft/hr for LWD data density 12,521.0 12,560.0 7/5/2021 01:30 7/5/2021 02:30 1.00 PROD1, DRILL OTHR T Trouble shoot downhole tools while CBU, 240 gpm, 1520 psi, 13% flow out, 100 rpm, 7 k tq. 12,560.0 12,386.0 7/5/2021 02:30 7/5/2021 03:00 0.50 PROD1, DRILL OWFF T Trapped 100 psi on back side with MPD, pressure bled to 0, monitored well for 30 min. Rotated 5 rpm, 4.5 k tq 12,386.0 12,386.0 7/5/2021 03:00 7/5/2021 05:15 2.25 PROD1, DRILL CIRC T Circulate bottoms up, 240 gpm, 1510 psi, 13% flow out, 100 rpm, 6 k tq. Reduce rate for 90 bbl/hr losses, 125 gpm, 590 psi. Observe max gas of 925 on bottoms up. Simops - begin building LCM pill. 12,386.0 12,386.0 7/5/2021 05:15 7/5/2021 06:00 0.75 PROD1, DRILL OWFF T Circulate over the top of the hole and monitor for static loss rate. Simops - finish building LCM pill. 12,386.0 12,386.0 7/5/2021 06:00 7/5/2021 07:00 1.00 PROD1, DRILL CIRC T Run in the hole f/ 12,386' - t/12,557' MD, pump and spot 40 bbls of 40 lb/bbl LCM. 12,386.0 12,557.0 7/5/2021 07:00 7/5/2021 08:00 1.00 PROD1, DRILL SMPD T Strip out of the hole f/ 12,557' - t/ 11,627' MD, 220 k Up Wt, 168 k Dn Wt. With MPD, apply 80 psi pulling and 30 psi in slips. 12,557.0 11,627.0 7/5/2021 08:00 7/5/2021 09:00 1.00 PROD1, DRILL OWFF T Close MPD chokes and monitor for pressure for 30 min (0 psi increase). Open chokes and monitor well for 30 min (static). 11,627.0 11,627.0 7/5/2021 09:00 7/5/2021 18:30 9.50 PROD1, DRILL SMPD T Strip out of the hole f/ 11,627' - t/ 343' MD, monitor hole fill on pit #2. With MPD, apply 40 psi while pulling. 11,627.0 343.0 7/5/2021 18:30 7/5/2021 18:45 0.25 PROD1, DRILL OWFF T Monitor well for 15 min (static) 343.0 343.0 7/5/2021 18:45 7/5/2021 19:45 1.00 PROD1, DRILL MPDA T Remove RCD per Beyond rep, install the trip nipple. 343.0 343.0 7/5/2021 19:45 7/5/2021 21:30 1.75 PROD1, DRILL BHAH T Lay down BHA per Baker DD and MWD reps. Monitor hole fill on pit #2. 343.0 0.0 Rig: DOYON 25 Page 32/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/5/2021 21:30 7/5/2021 22:00 0.50 PROD1, DRILL BHAH T Clear and clean rig floor of BHA #6 components, load the rig floor with BHA #7 components. Circulate over top of the hole to monitor the well. 0.0 0.0 7/5/2021 22:00 7/6/2021 00:00 2.00 PROD1, DRILL BHAH T Begin picking up BHA #7 per Baker DD and MWD to 115' MD Monitor displacement on trip pit #2 0.0 115.0 7/6/2021 00:00 7/6/2021 02:45 2.75 PROD1, DRILL BHAH T Continue picking up BHA #7 per Baker DD and MWD f/ 115' - t/ 344' MD, 61 k Up Wt, 115.0 344.0 7/6/2021 02:45 7/6/2021 06:00 3.25 PROD1, DRILL TRIP T Trip in the hole with BHA #7 f/ 344' - t/ 6,125' MD, monitoring displacement on trip pit #2, filling pipe every 20 stands Shallow hole tested tools at 2,220' MD, 85 k Up Wt, 89 k Dn Wt, 87 k Rot Wt. 344.0 6,125.0 7/6/2021 06:00 7/6/2021 09:00 3.00 PROD1, DRILL TRIP T Trip in the hole with BHA #7 f/ 6,125' - t/ 11,535' MD, 205 k Up Wt, 164 k Dn Wt. monitoring displacement on trip pit #2, filling pipe every 20 stands 6,125.0 11,535.0 7/6/2021 09:00 7/6/2021 10:00 1.00 PROD1, DRILL MPDA T Pull the trip nipple and install the RCD per Beyond rep. Verify flow path through MPD equipment. 11,535.0 11,535.0 7/6/2021 10:00 7/6/2021 11:00 1.00 PROD1, DRILL TRIP T Trip in the hole with BHA #7 f/ 11,535' - t/ 12,391' MD, 208 k Up Wt, 148 k Dn Wt. monitoring displacement on trip pit #2. 11,535.0 12,391.0 7/6/2021 11:00 7/6/2021 12:00 1.00 PROD1, DRILL WASH T Wash and ream in the hole f/ 12,391' - t/ 12,560' MD, 260 gpm, 1760 psi, 13% flow out, 80 rpm, 4.5 k tq 176 k Rot Wt. 12,391.0 12,560.0 7/6/2021 12:00 7/6/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 12,560' - 12,807' MD, 8,421' TVD, 8 k wob, 260 gpm, 1820 psi, 13% flow out, 120 rpm, 7 k tq, 213 k Up Wt, 162k So Wt, 186 k Rot Wt. ADT = 5.4, total bit hrs = 5.4 Control drilling at 50 ft/hr for LWD data density 12,560.0 12,807.0 7/6/2021 18:00 7/7/2021 00:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 12,807' - 13,067' MD, 8,430' TVD, 9 k wob, 260 gpm, 1940 psi, 15% flow out, 120 rpm, 7 k tq, 215 k Up Wt, 154k So Wt, 182 k Rot Wt. ADT = 5.4, total bit hrs = 10.8 Control drilling at 50 ft/hr for LWD data density Observe losses ~35 bph at 12,940' MD 12,807.0 13,067.0 7/7/2021 00:00 7/7/2021 06:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 13,067' - 13,374' MD, 8,433' TVD, 14 k wob, 260 gpm, 1970 psi, 15% flow out, 120 rpm, 10 k tq, 215 k Up Wt, 154k So Wt, 178 k Rot Wt. ADT = 5.2, total bit hrs = 16 Control drilled at 50 ft/hr to 13,280' MD Control drilling at 100 ft/hr for LWD data density 13,067.0 13,374.0 7/7/2021 06:00 7/7/2021 12:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 13,374' - 13,874' MD, 8,396' TVD, 20 k wob, 260 gpm, 2080 psi, 15% flow out, 135 rpm, 10.5 k tq, 219 k Up Wt, 157k So Wt, 179 k Rot Wt. ADT = 5.2, total bit hrs = 21.2 Control drilling at 100 ft/hr for LWD data density 13,374.0 13,874.0 Rig: DOYON 25 Page 33/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/7/2021 12:00 7/7/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 13,874' - 14,360' MD, 8,371' TVD, 10 k wob, 260 gpm, 2120 psi, 15% flow out, 135 rpm, 10 k tq, 215 k Up Wt, 145k So Wt, 178 k Rot Wt. ADT = 5.2, total bit hrs = 26.4 Control drilling at 100 ft/hr for LWD data density Losses 20 bph, increase LCM additions from 1 ppb to 2 ppb 13,874.0 14,360.0 7/7/2021 18:00 7/8/2021 00:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 14,360' - 14,870' MD, 8,372' TVD, 10 k wob, 260 gpm, 2070 psi, 15% flow out, 135 rpm, 10 k tq, 225 k Up Wt, 143k So Wt, 185 k Rot Wt. ADT = 5.1, total bit hrs = 31.5 Control drilling at 100 ft/hr for LWD data density Adding 2 ppb Mixed LCM to active system for losses 14,360.0 14,870.0 7/8/2021 00:00 7/8/2021 06:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 14,870' - 15,395' MD, 8,373' TVD, 14 k wob, 260 gpm, 2220 psi, 15% flow out, 135 rpm, 9.5 k tq, 225 k Up Wt, 143k So Wt, 181 k Rot Wt. ADT = 5.3, total bit hrs = 36.8 Control drilling at 100 ft/hr for LWD data density Increase LCM additions to 3 ppb in active due 50-70 bph losses, no change 14,870.0 15,395.0 7/8/2021 06:00 7/8/2021 07:45 1.75 PROD1, DRILL DDRL P Drill 6.5" production hole from 15,395' - 15,528' MD, 8,369' TVD, 10 k wob, 260 gpm, 2060 psi, 15% flow out, 135 rpm, 9.5 k tq, 225 k Up Wt, 143k So Wt, 181 k Rot Wt. Control drilling at 100 ft/hr for LWD data density 15,395.0 15,528.0 7/8/2021 07:45 7/8/2021 08:15 0.50 PROD1, DRILL OTHR P Circulate and reciprocate for 15 min, 260 gpm, 2200 psi, 80 rpm, 7 k tq, 14 % flow out. Swap to generator power, energize rig operating systems and function test. 15,528.0 15,528.0 7/8/2021 08:15 7/8/2021 12:00 3.75 PROD1, DRILL DDRL P Drill 6.5" production hole from 15,528' - 15,869' MD, 8,356' TVD, 10 k wob, 260 gpm, 2280 psi, 15% flow out, 135 rpm, 8 k tq, 228 k Up Wt, 138k So Wt, 182 k Rot Wt. ADT = 4.7, total bit hrs = 41.5 Control drilling at 100 ft/hr for LWD data density Increase LCM additions to 5 ppb in active due 50-70 bph losses, no change 15,528.0 15,869.0 7/8/2021 12:00 7/8/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 15,869' - 16,384' MD, 8,339' TVD, 12 k wob, 260 gpm, 2220 psi, 15% flow out, 135 rpm, 8 k tq, 232 k Up Wt, 142k So Wt, 186 k Rot Wt. ADT =5.2, total bit hrs = 46.7 Control drilling at 100 ft/hr for LWD data density 15,869.0 16,384.0 Rig: DOYON 25 Page 34/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/8/2021 18:00 7/9/2021 00:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 16,384' - 16,860' MD, 8,328' TVD, 12 k wob, 260 gpm, 2240 psi, 15% flow out, 135 rpm, 8 k tq, 234 k Up Wt, 140k So Wt, 186 k Rot Wt. ADT =4.9, total bit hrs = 51.6 Control drilling at 100 ft/hr for LWD data density Maintaining 5 ppb total LCM in active system, Mix II M, Nut Plug F, Safe Carb 250 and 500. 16,384.0 16,860.0 7/9/2021 00:00 7/9/2021 06:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 16,384' - 17,387' MD, 8,309' TVD, 17 k wob, 260 gpm, 2348 psi, 14% flow out, 135 rpm, 11 k tq, 238 k Up Wt, 136k So Wt, 185 k Rot Wt. Control drilling at 100 ft/hr for LWD data density Maintaining 5 ppb LCM additions in active due 50-70 bph losses, no change. Mix II M, Nut Plug F, Safe Carb 250 and 500. 16,860.0 17,387.0 7/9/2021 06:00 7/9/2021 12:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 17,387' - 17,908' MD, 8,305' TVD, 12 k wob, 260 gpm, 2412 psi, 13% flow out, 125 rpm, 12 k tq, 238 k Up Wt, 136k So Wt, 185 k Rot Wt. Control drilling at 100 ft/hr for LWD data density Cease all LCM additions, losses remain 50 bph 17,387.0 17,908.0 7/9/2021 12:00 7/9/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 17,908' - 18,340' MD, 8,313' TVD, 13 k wob, 260 gpm, 2500 psi, 14% flow out, 135 rpm, 13 k tq, 244 k Up Wt, 111k So Wt, 185 k Rot Wt. Control drilling at 100 ft/hr for LWD data density 17,908.0 18,340.0 7/9/2021 18:00 7/10/2021 00:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 18,340' - 18,838' MD, 8,330' TVD, 14 k wob, 270 gpm, 2750 psi, 14% flow out, 135 rpm, 13-14 k tq, 245 k Up Wt, 134 k So Wt, 187 k Rot Wt. Control drilling at 100 ft/hr for LWD data density Losses remain 50-60 bph, no LCM additions 18,340.0 18,838.0 7/10/2021 00:00 7/10/2021 06:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 18,838' - 19,279' MD, 8,325' TVD, 12 k wob, 266 gpm, 2940 psi, 14 % flow out, 135 rpm, 14 k tq, 245 k Up Wt, 134 k So Wt, 187 k Rot Wt. ADT 4.5 hrs, Bit Hrs 76.1 hrs. Control drilling at 100 ft/hr for LWD data density. Pump 2- LCM Bridging pills with Safe Carb 2, Safe Carb 40, no noticable change in loss rate of 50-70 bph. 18,838.0 19,279.0 Rig: DOYON 25 Page 35/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/10/2021 06:00 7/10/2021 12:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 19,279' - 19,762' MD, 8,281' TVD, 14 k wob, 266 gpm, 2884 psi, 17 % flow out, 135 rpm, 13 k tq, 252 k Up Wt, 185 k So Wt, 187 k Rot Wt. ADT 5.3 hrs, Bit Hrs 81.4 hrs. Control drilling at <100 ft/hr for LWD data density. Loss rate of 50-70 bph. 19,279.0 19,762.0 7/10/2021 12:00 7/10/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 19,762' - 20,004' MD, 8,266' TVD, 5 k wob, 266 gpm, 2850 psi, 13 % flow out, 135 rpm, 13 k tq, 252 k Up Wt, 105 k So Wt, 180 k Rot Wt. ADT 5.5 hrs, Bit Hrs 86.9 hrs. Back Pressure 4psi. Control drilling at <50 ft/hr to steer down and LWD data density. Added 3 ppb Torque Seal to mud syst Loss rate of 40-70 bph. 19,762.0 20,004.0 7/10/2021 18:00 7/11/2021 00:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 20,004' - 20,164' MD, 8,251' TVD, 14 k wob, 266 gpm, 2925 psi, 14 % flow out, 135 rpm, 14 k tq, 252 k Up Wt, 124 k So Wt, 192 k Rot Wt. ADT 5.4 hrs, Bit Hrs 92.3 hrs. Back Pressure 23psi. Control drilling at <50 ft/hr for LWD data density. Loss rate of 25-60 bph. 20,004.0 20,164.0 7/11/2021 00:00 7/11/2021 06:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 20,164' - 20,355' MD, 8,234' TVD, 14 k wob, 300 gpm, 3370 psi, 14 % flow out, 135 rpm, 13 k tq, 252 k Up Wt, 124 k So Wt, 174 k Rot Wt. ADT 3.9 hrs, Bit Hrs 96.2 hrs. Control drilling at <50 ft/hr for LWD data density. Loss rate of 20-40 bph. 20,164.0 20,355.0 7/11/2021 06:00 7/11/2021 12:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 20,355' - 20,599' MD, 8,213' TVD, 14 k wob, 297 gpm, 3525 psi, 18 % flow out, 135 rpm, 14 k tq, 235 k Up Wt, 188 k So Wt, 174 k Rot Wt. ADT 5.1 hrs, Bit Hrs 101.3 hrs. Control drilling at <50 ft/hr for LWD data density. Loss rate of 20-40 bph. 20,355.0 20,599.0 7/11/2021 12:00 7/11/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 20,599' - 21,017' MD, 8,178' TVD, 14 k wob, 300 gpm, 3548 psi, 17 % flow out, 135 rpm, 14 k tq, 246 k Up Wt, 94 k So Wt, 186 k Rot Wt. ADT 5.2 hrs, Bit Hrs 106.5 hrs. Control drilling at 50-100 ft/hr for LWD data density. Loss rate of 20-40 bph. 20,599.0 21,017.0 7/11/2021 18:00 7/11/2021 18:30 0.50 PROD1, DRILL DDRL P Drill 6.5" production hole from 21,017' - 21,050' MD, 8,175' TVD, 15 k wob, 300 gpm, 3550 psi, 18 % flow out, 135 rpm, 15 k tq, 246 k Up Wt, 94 k So Wt, 186 k Rot Wt. ADT 0.4 hrs, Bit Hrs 106.9 hrs. Control drilling at 50-100 ft/hr for LWD data density. Loss rate of 20-40 bph. 21,017.0 21,050.0 Rig: DOYON 25 Page 36/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/11/2021 18:30 7/11/2021 23:00 4.50 PROD1, CASING CIRC P CBU 2X whilst BROOH L/D one stand per BU f/ 21,050' -20,773' MD w/ 300 gpm, 3,570 psi, 15% flow out, 120 rpm, 12k ftlbs, and 172k RT Wt. 21,050.0 20,773.0 7/11/2021 23:00 7/12/2021 00:00 1.00 PROD1, CASING CIRC P Displace well to 8.5 ppg Viscous brine while rotating and reciprocating f/ 20,773'-20,680' MD w/ 300 gpm, 2730 - 3550 psi, 15% Flow out, 15k ftlbs, 172 k RT Wt, Total pump strokes 3,450. 20,773.0 20,680.0 7/12/2021 00:00 7/12/2021 02:45 2.75 PROD1, CASING CIRC P Displace well to 8.5 ppg Viscous brine while rotating and reciprocating f/ 20,773'-20,863' MD w/ 295 gpm, ICP 3557 psi, FCP 2070 psi, 16% Flow out, 10k ftlbs, 100 rpm, 180 k RT Wt, Total pump strokes 10,900.. 20,773.0 20,680.0 7/12/2021 02:45 7/12/2021 03:15 0.50 PROD1, CASING MPDA P Attempted to close drill string floats for MPD fingerprint. Performed fingerprint as per beyond. Recording bleed off volume in the trip tank. Initial MPD pressure = 127 psi. Final MPD pressure = 101 psi. Total volume bleed bak was 4.6 ppg. Equivalent formation pressure was estimated to be 8.73 ppg EMW. Note* Floats did not hold. 20,680.0 20,680.0 7/12/2021 03:15 7/12/2021 06:00 2.75 PROD1, CASING CIRC P Continued to CBU while rotating and reciprocating pipe f/ 20,768' - 20,860' MD w/ 290 gpm, 2150 psi, 16% flow out, 100 rpm, 10k ftlbs, Total Gas 7049, 181k RT Wt, SIMOPS: Began bringing in KCL to weigh up system. 20,768.0 20,860.0 7/12/2021 06:00 7/12/2021 06:30 0.50 PROD1, CASING CIRC P Continued to CBU while rotating and reciprocating pipe f/ 20,768' - 20,860' MD w/ 290 gpm, 2150 psi, 14% flow out, 100 rpm, 9.5k ftlbs, Total Gas 220, 181k RT Wt, Total pumped strokes 9,700 20,860.0 20,768.0 7/12/2021 06:30 7/12/2021 07:30 1.00 PROD1, CASING STRP P SOOH f/ 20,768' - 20,292' MD w/ 200 gpm in back side, MPD pressure in/out slips = 160 psi. Pulled at a rate of 33 fpm. 9% flow out, P/U WT 251 k. 20,768.0 20,292.0 7/12/2021 07:30 7/12/2021 12:00 4.50 PROD1, CASING BKRM P Performed LWD MAD pass while back reaming f/ 20,292' - 20,100' MD. w/ 260 gpm, 2,030 @ 8.8 ppg. 60 rpm, w/ 8k ftlbs, LWD MAD pass was performed at a rate of 50 fph. 191 RT Wt. SIMOPS: Weighted up mud system to 8.8 ppg on the fly. L/D 4" DP out of the derrick. 20,292.0 20,100.0 7/12/2021 12:00 7/12/2021 18:00 6.00 PROD1, CASING BKRM P Performed LWD MAD pass while back reaming f/ 20,100' - 19,865' MD. w/ 260 gpm, 2,050 @ 8.8 ppg. 60 rpm, w/ 8k ftlbs, 10 % Flow out. LWD MAD pass was performed at a rate of 50 fph. 182 RT Wt. 20,100.0 19,865.0 7/12/2021 18:00 7/12/2021 22:15 4.25 PROD1, CASING BKRM P Performed LWD MAD pass while back reaming f/ 19,865' - 19,668' MD. w/ 266 gpm, 2,000 @ 8.8 ppg. 60 rpm, w/ 8k ftlbs, 10 % Flow out. LWD MAD pass was performed at a rate of 50 fph. 182 RT Wt. 19,865.0 19,668.0 Rig: DOYON 25 Page 37/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/12/2021 22:15 7/13/2021 00:00 1.75 PROD1, CASING CIRC P CBU while performing Star Trak speeed tests f/ 19,670' - 19,620' MD. w/ 266 gpm, 2,130 psi, 120 rpm, 8 k ftlbs, 10% flow out, 182 k RT Wt, Total strokes 7,350. Sent downlink to shut down the tool. 19,668.0 19,620.0 7/13/2021 00:00 7/13/2021 06:00 6.00 PROD1, CASING STRP P SOOH f/ 19,630' - 16,197' MD whilst L/D 4" DP.. 248 k Up Wt,, 212 k SO Wt, Monitored displacement on the trip pit w/ mud pump on the injection line @ 156 gpm. Holding 30 psi BP. 19,630.0 16,197.0 7/13/2021 06:00 7/13/2021 10:30 4.50 PROD1, CASING STRP P SOOH f/ 16,197' - 11,537' MD w/ 4" DP racking back in the derrick. 240 k Up Wt,, 200 k SO Wt @ 11,900' MD, Monitored displacement on the trip pit w/ mud pump on the injection line @ 156 gpm. Holding 30 psi BP. Ovserved 20k OP while passing through the shoe. 16,197.0 11,537.0 7/13/2021 10:30 7/13/2021 12:00 1.50 PROD1, CASING CIRC P Displacewd well @ 11,537' MD. to 9.1 ppg KW CI Clear Brine. Pumped at 270 gpm, 1420 psi ICP, 1739 psi FCP, 8% flow out, 60 rpm, 8.5-6.5 k ftlbs, 234 k Up Wt,, 198 k SO Wt, 184 k Rot Wt. Total strokes pumped 6450. 11,537.0 11,537.0 7/13/2021 12:00 7/13/2021 12:30 0.50 PROD1, CASING OWFF P OWFF for 30 minutes through MDP port (Static). SIMOPS: Cleared rig floor and PJSM on pulling Beyond RCD bearing. 11,537.0 11,537.0 7/13/2021 12:30 7/13/2021 13:30 1.00 PROD1, CASING MPDA P Pulled RCD bearing and L/D as per beyond rep. Installed trip nipple and hole fill lines. Function tested hole fill pump and lined up to trip tank. 11,537.0 11,535.0 7/13/2021 13:30 7/13/2021 14:00 0.50 PROD1, CASING TRIP P B/D Top Drive and MWD Equipment. 11,535.0 11,535.0 7/13/2021 14:00 7/13/2021 20:15 6.25 PROD1, CASING TRIP P POOH f/ 11,535' - 4,640' MD w/ 4" DP L/D doubles into the pipe shed. 113 k Up Wt,, 106 k SO Wt, Monitored displacement on trip pit. 11,535.0 4,640.0 7/13/2021 20:15 7/14/2021 00:00 3.75 PROD1, CASING TRIP P POOH f/ 4,640' - 660' MD w/ 4" DP L/D singles into the pipe shed. 66 k Up Wt,, 60 k SO Wt, Monitored displacement on trip pit. Started filling hole w/ 8.9 ppI Clear Brine at 22:30hr. 4,640.0 660.0 7/14/2021 00:00 7/14/2021 00:30 0.50 PROD1, CASING TRIP P POOH f/ 660' - 344' MD w/ 4" DP L/D singles into the pipe shed. Monitored displacement on trip pit #2. 58 k PU Wt, and 60 k SO Wt. 660.0 344.0 7/14/2021 00:30 7/14/2021 02:30 2.00 PROD1, WHDBOP BHAH P PJSM. L/D BHA #7. L/D 4" HWDP and BHA into the pipe shed. Maintained constant hole fill over the top. 50 k PU Wt, 60 k SO Wt. 344.0 0.0 7/14/2021 02:30 7/14/2021 03:00 0.50 PROD1, WHDBOP RGRP T Repaired hydraulic hose under rotary table. Cleaned, inspected, and repaired hydraulic line. 0.0 0.0 7/14/2021 03:00 7/14/2021 04:15 1.25 PROD1, WHDBOP BHAH P Continued to lay down BHA #7 as per BHI Rep. L/D to pipe shed. Maintained constand hole fill over the top. Monitored displacement on trip pit #2. 0.0 0.0 7/14/2021 04:15 7/14/2021 04:45 0.50 PROD1, WHDBOP CLEN P Clean and clear rig floor. L/D BHI subs to ground level. 0.0 0.0 Rig: DOYON 25 Page 38/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/14/2021 04:45 7/14/2021 06:15 1.50 PROD1, WHDBOP SLPC P Cut and slipped drill line. Hung blocks. Slipped 182' of new line. Calibrated Amphion and PASON. Checked C.O.M. 131.4'. 0.0 0.0 7/14/2021 06:15 7/14/2021 08:30 2.25 PROD1, WHDBOP TRIP P RIH w/ 4" DP to 955' MD and L/D 4" DP to shed. 50 k PU Wt, and 52 k SO Wt Monitored displacement on trip pit #2. . 0.0 0.0 7/14/2021 08:30 7/14/2021 09:30 1.00 PROD1, WHDBOP WWWH P Pulled wear ring and rigged up Johnny Wacker. Washed wellhead @ 300 gpm w/ 120 psi, 20-40 rpm. 0.0 0.0 7/14/2021 09:30 7/14/2021 10:00 0.50 PROD1, WHDBOP RURD P Prepared for BOP test, build FOSV, dart valve configuration. Installed top drive pump in sub. Greased Upper IBOP. Fill and flood. 0.0 0.0 7/14/2021 10:00 7/14/2021 12:00 2.00 PROD1, WHDBOP BOPE P Tested fire and gas alarms w/ AOGCC Rep Guy Cook. WOrked air out of testing system. Pressure tested annular preventer, Upper IBOP, choke valves #1,13,14, and15 to 250 psi for 5 minutes, and 3500 psi for 10 minutes. 0.0 0.0 7/14/2021 12:00 7/14/2021 22:00 10.00 PROD1, WHDBOP BOPE P Test BOPE: All tests to 250 psi low for 5 minutes, 3500 psi high for 10 minutes charted minimum w/ exception of manual operated Super Choke 2000 psi show bleed and hold pressure, 4" test joint test annular, 2 7/8" x 5 1/2" UPR, 2 7/8" x 5 1/2" LPR, w/ 4 1/2" test joint. Test 2 7/8" x 5 1/2" UPR & Test 2 7/8" x 5 1/2" LPR. Test choke valves 1-15, choke & kill manuals & HCR's, 4" valve on kill line. Two 4" FOSV, one 4" dart valve, performed Koomey drawdown, ACC = 3000 psi. Manifold = 1500 psi. ACC - 1550 psi after all functions on the bottles, 16 secs for 200 psi. Build w/ 2 electric pumps, 100 secs to build full system pressure w/ 2 electric & 2 air pumps. Closing times annular = 23 secs, UPR 18 secs, Blind/Shears = 16 secs, Choke HCR = 2 secs, Kill HCR = 2 secs, Test PVT gain/loss and flow out alarms. Test LEL and H2S alarms. AOGCC Rep Guy Cook, witnessed all. 0.0 0.0 7/14/2021 22:00 7/15/2021 00:00 2.00 PROD1, WHDBOP SVRG T Removed Upper & Lower IBOP. Installed new rebuilt Upper/Lower IBOP. 0.0 0.0 7/15/2021 00:00 7/15/2021 02:00 2.00 PROD1, WHDBOP BOPE P Continued testing BOPE: Upper & Lower IBOP, Blind/Shear rams and choke valve #4 to 250 psi low for 5 minutes and 3500 psi high for 10 charted minutes. AOGCC Witness: Guy Cook. 0.0 0.0 7/15/2021 02:00 7/15/2021 03:15 1.25 COMPZ1, RPCOMP RURD P B/D and rig down testing equipment. Aligned BOP equipment. Pulled and laid down test plug. Rigged down hole fill line from upper annulus valve. 0.0 0.0 7/15/2021 03:15 7/15/2021 04:45 1.50 COMPZ1, RPCOMP TRIP P M/U stack washer to 4" DP stand from the derrick. TIH from surface to 3,662' MD w/ 4" DP. 102 k PU Wt, 98 k SO Wt. Monitored displacement on trip pit #2. 0.0 3,622.0 7/15/2021 04:45 7/15/2021 06:00 1.25 COMPZ1, RPCOMP TRIP P POOH f/ 3,662' - 2,776' MD whilst laying down 4" DP singles into the shed.. Maintained constant hole fill from the top. Monitored displacement on trip pit #2. Manually strapped every 15 joitns. 102 k PU Wt, 98 k SO Wt. 3,622.0 2,776.0 Rig: DOYON 25 Page 39/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/15/2021 06:00 7/15/2021 11:30 5.50 COMPZ1, RPCOMP TRIP P POOH f/ 2,776' - 65' MD whilst laying down 4" DP singles into the shed.. Maintained constant hole fill from the top. Monitored displacement on trip pit #2. Manually strapped every 15 joitns. 102 k PU Wt, 98 k SO Wt. 2,776.0 65.0 7/15/2021 11:30 7/15/2021 12:00 0.50 COMPZ1, RPCOMP WWWH P Washed the wellhead and BOP stack. Pumped at 300 gpm w/ 156 psi. 10-40 rpm. L/D Johnny Wacker and 2 jts of 4" DP. B/D top drive. Cleaned and cleared the rig floor. SIMOPS: B/D injection line and replaced hydraulic rig floor line. 65.0 0.0 7/15/2021 12:00 7/15/2021 15:00 3.00 COMPZ1, RPCOMP RURD P L/D non essential equipment. P/U Halliburton spooler, completions cable, and R/U casing tongs. 0.0 0.0 7/15/2021 15:00 7/15/2021 16:45 1.75 COMPZ1, RPCOMP PUTB P PJSM in preparation to run 4.4" 12.6 ppf TS Blue, TXP, & 563 tubing completions. Made up jewellery as per CPAI running order f/ surface to 922' MD. 0.0 922.0 7/15/2021 16:45 7/15/2021 17:30 0.75 COMPZ1, RPCOMP RCST P M/U Halliburton control line to guage mandrell to TEC wire. Tested successful.. 922.0 922.0 7/15/2021 17:30 7/16/2021 00:00 6.50 COMPZ1, RPCOMP RCST P PJSM in preparation to run 4.4" 12.6 ppf, L-80, H563 completions tubing f/ 922' to 6,557' MD as per CPAI running order. Cable clamped every joint and tested TEC line every 2,000' while RIH. Monitor well w/ hole fill. 922.0 6,557.0 7/16/2021 00:00 7/16/2021 01:30 1.50 COMPZ1, RPCOMP RCST P Ran 4.5" 12.6 ppf, L-80, H563 completions tubing f/ 6,557' to 7,815' MD as per CPAI running order. Cable clamped every joint and tested TEC line every 2,000' while RIH. Monitored displacement w/ constant hole fill. over the top. Mannually strapping trip pit every 10. 6,557.0 7,815.0 7/16/2021 01:30 7/16/2021 04:15 2.75 COMPZ1, RPCOMP EQRP T Stopped RIH w/ completions as TEC line got pinched in the air slips. POOH to 7,776' to gain slack in the TEC line and install TIW valve. Halliburton crew spliced and tested TEC line. Maintained constant hole fill over the top. 7,815.0 7,776.0 7/16/2021 04:15 7/16/2021 06:00 1.75 COMPZ1, RPCOMP RCST P Resumed RIH w/ 4.5" 12.6 ppf, L-80, H563 completions tubing f/ 7,776' to 9,324' MD as per CPAI running order. Cable clamped every joint and tested TEC line every 2,000' while RIH. Monitored displacement w/ constant hole fill. over the top. Mannually strapping trip pit every 10. 7,776.0 9,324.0 7/16/2021 06:00 7/16/2021 10:00 4.00 COMPZ1, RPCOMP RCST P Cont. RIH w/ 4.5'' 12.6 ppf, L-80, H563 completions tubing f/ 9,324' t/ 12,330'. Cable clamped every joint and tested TEC line every 2,000' while RIH. Monitored displacement w/ constant hole fill. over the top. Mannually strapping trip pit every 10. 280 - Cross Coupling Clamps 6 - Mid Joint Clamps. TEC WIre Splice Depth 4575' MD. 9,324.0 12,330.0 7/16/2021 10:00 7/16/2021 11:30 1.50 COMPZ1, RPCOMP HOSO P PJSM, M/U hanger as per FMC rep, Terminate TEC wire as per HES rep 12,330.0 12,330.0 Rig: DOYON 25 Page 40/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/16/2021 11:30 7/16/2021 12:00 0.50 COMPZ1, RPCOMP HOSO P Drain stack, RIH w/ tubing & hanger t/ 12,375' Run in lock down pins & verified by FMC rep SIMOPS: R/U HES TEC wire spool, clean rig floor of casing running equipment 12,330.0 12,375.0 7/16/2021 12:00 7/16/2021 13:00 1.00 COMPZ1, RPCOMP PRTS P Fill stack w/ fresh water, R/U test equipment, Test tubing hanger t/ 3,000 psi f/ 30 minutes, Charted test 12,375.0 12,375.0 7/16/2021 13:00 7/16/2021 14:00 1.00 COMPZ1, RPCOMP PULD P PJSM, Back out landing joint & L/D same, suck out stack, Blow down choke & kill lines 12,375.0 12,375.0 7/16/2021 14:00 7/16/2021 15:00 1.00 COMPZ1, WHDBOP OTHR P PJSM, pull mousehole, De-energize Koomey, Break choke & kill lines, hole fill lines, Remove flow box 12,375.0 12,375.0 7/16/2021 15:00 7/16/2021 17:30 2.50 COMPZ1, WHDBOP NUND P Set back BOP stack and removed high pressure surface riser. 12,375.0 12,375.0 7/16/2021 17:30 7/16/2021 19:30 2.00 COMPZ1, WHDBOP NUND P Halliburton terminated TEC wire connection, SIMOPS: Installed floor cover in BOP deck, C/O Saver sub for next well, cleaned pits, and unhooked interconnects. 12,375.0 12,375.0 7/16/2021 19:30 7/16/2021 21:30 2.00 COMPZ1, WHDBOP NUND P Installed adapter flange and tree as per FMC (Test adapter flange to 5k psi f/ 10 minutesm good). SIMOPS: Continued cleaning pits, removed kelly hose, installed top drive yokes, and C/O Baker BPA for next well. Prepped soft pad for move. 12,375.0 12,375.0 7/16/2021 21:30 7/17/2021 00:00 2.50 COMPZ1, WHDBOP THGR P Tested adapter flange to 5000 psi f/ 5 minutes. Filled tree w/ diesel. Tested tree to 250/5000 psi Lo/High (10 minutes each). SIMOPS: Cleaned pits and prepped soft pad for move. 12,375.0 12,375.0 7/17/2021 00:00 7/17/2021 01:00 1.00 COMPZ1, WHDBOP THGR P Observed pressure under BPV. P/U lubricator and removed BPV. 0.0 0.0 7/17/2021 01:00 7/17/2021 02:30 1.50 COMPZ1, WHDBOP FRZP P Rigged and tested lines to IA and tubing w/ Litttle Red. 0.0 0.0 7/17/2021 02:30 7/17/2021 05:30 3.00 COMPZ1, WHDBOP FRZP P PJSM. Bull headed 42 bbls of LEPD down the IA. Bullheaded 30 bbls of SW down the tubing. Dropped 3.688" In - Tallic Ball. Chased ball w/ 50 bbls Sea Water. Swapped to brine and continued pumping as pressure increased to 2938 psi at 117 bbls. The packer was confirmed set but the Frac sleeve opened prematurely. 24 bbls of freeze protect was then pumped down the tubing. SIMOPS: Scope derrick, raise C section, Lower cattle chute, Prep rig floor f/ skid 0.0 0.0 7/17/2021 05:30 7/17/2021 06:15 0.75 COMPZ1, WHDBOP PRTS P Pressure tested the IA to ~2,500 psi for 30 minutes. SIMOPS: Swap t/ cold start power, begin t/ unplug electrical between rig modules 0.0 0.0 7/17/2021 06:15 7/17/2021 07:00 0.75 COMPZ1, WHDBOP OTHR P R/U lubricator & install BPV 0.0 0.0 Rig: DOYON 25 Page 41/41 MT7-03 Report Printed: 8/2/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/17/2021 07:00 7/17/2021 08:00 1.00 DEMOB, MOVE DMOB P Secure cellar area & prep rig f/ DEMOB Rig released to MT7-06 @ 08:00 on 7/17/21 0.0 0.0 Rig: DOYON 25 Page 1/1 MT7-03 Report Printed: 7/20/2021 Cement Cement Details Description Surface String Cement Cementing Start Date 6/10/2021 15:00 Cementing End Date 6/10/2021 20:45 Wellbore Name MT7-03 Comment SLB pump 5 bbls of fresh H2O. Tested lines to 500 psi low/ 3500 psi high, pump 100 bbls of 10.8 ppg Mud Push II @ 5 bbls/min, 390 psi, 17% F/O, Dropped bottom plug. Start batching lead. Pump 483 bbls of 11.0 ppg DeepCRETE cement at 5.5 bbls/min, 400 psi ICP, F/O 15%. Batch and pump 72 bbls of G Blend Tail 15.8 ppg cement @ 4.5 bbls/min, 225 psi, F/O 16%. Drop top plug & kick out with 20 bbls of fresh H2O. Swap to rig & displace w/ 10 ppg Ksi mud @ 6 bbls/min, 490 psi, F/O 20%. Bump plug with 1050 psi (494 bbls + 20 bbls). 4180 strokes, final circ. PSI 428 @ 2bpm, Pressure up to 1050 psi & hold for 5 minutes. Bleed off pressure, Check floats, Floats holding, 175 bbls 11.0 ppg cement to surface. Cement Stages Stage # 1 Description Surface String Cement Objective Top Depth (ftKB) 39.8 Bottom Depth (ftKB) 3,523.4 Full Return? Yes Vol Cement … 175.0 Top Plug? Yes Btm Plug? Yes Q Pump Init (bbl/m… 5 Q Pump Final (bbl/… 6 Q Pump Avg (bbl/… 6 P Pump Final (psi) 438.0 P Plug Bump (psi) 1,050.0 Recip? Yes Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment SLB pump 5 bbls of fresh H2O. Tested lines to 500 psi low/ 3500 psi high, pump 100 bbls of 10.8 ppg Mud Push II @ 5 bbls/min, 390 psi, 17% F/O, Dropped bottom plug. Start batching lead. Pump 483 bbls of 11.0 ppg DeepCRETE cement at 5.5 bbls/min, 400 psi ICP, F/O 15%. Batch and pump 72 bbls of G Blend Tail 15.8 ppg cement @ 4.5 bbls/min, 225 psi, F/O 16%. Drop top plug & kick out with 20 bbls of fresh H2O. Swap to rig & displace w/ 10 ppg Ksi mud @ 6 bbls/min, 490 psi, F/O 20%. Bump plug with 1050 psi (494 bbls + 20 bbls). 4180 strokes, final circ. PSI 428 @ 2bpm, Pressure up to 1050 psi & hold for 5 minutes. Bleed off pressure, Check floats, Floats holding, 175 bbls 11.0 ppg cement to surface. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Surface String Cement Page 1/1 MT7-03 Report Printed: 7/20/2021 Cement Cement Details Description Intermediate String 1 Cement Cementing Start Date 6/27/2021 23:00 Cementing End Date 6/28/2021 08:35 Wellbore Name MT7-03 Comment SLB pump 5 bbls of fresh H2O. Tested lines to 650 psi low/ 3900 psi high, pump 60.1 bbls of 11.5 ppg Mud Push II @ 2.5 bbls/min, 195 psi, Dropped bottom (bypass) plug. (cement wet @ 23:49) Pump 61.1 bbls 15.8 ppg Class G cement @ 2.8 bpm, 204 psi, FCP = 130 psi. Drop top (shutoff) plug & kick out with 20 bbls of fresh H2O. Swap to rig & displace w/ 10.6 ppg LSND mud @ 4.8 bbls/min, 75 psi. Slow pumps to 3 bpm at 3694 stks, at 3717 stks observed pressure build to 908 psi, shut down pumps and work pipe, continue displacing cement at .25 to 1 bpm, plug bump at 4275 stks (505 bbls + 20 bbls = 525 bbls), lost 10 bbls of cement during displacement. FCP=1875 psi. CIP 08:25 hrs 06/28/2021. Bled pressure and checked floats. (good) SLB pump 55.4 bbls of 11.5 ppg Mud Push II @ 4.5 bbls/min, 450 psi. Batch cement, (cement wet @ 12:23) Pump 51.2bbls of 15.8 ppg Class G cement @ 3.8 bpm, 443 psi, Drop closing plug & kick out with 20 bbls of fresh H2O. Swap to rig & displace w/ 10.6 ppg LSND mud @ 6 bbls/min, 425 psi. Slow pumps to 2 bpm at 3150 stks, plug bump at 3193 stks (377 bbls + 20bbls = 397 bbls) FCP= 251 psi. CIP 13:56 hrs 06/28/2021. Increase pressure to 1831 psi and close the cement stage collar. Bled off pressure and checked for flow (static). Cement Stages Stage # <Stage Number?> Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return?Vol Cement …Top Plug? Btm Plug? Q Pump Init (bbl/m… Q Pump Final (bbl/… Q Pump Avg (bbl/…P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Intermediate String 1 Cement STATE OF ALAS" Reviewed Reviewed By: —J-r-' L- OIL AND GAS CONSERVATION COMMISSION P.I. Supry IZ"i12ezA BOPE Test Report for: GMTU MT7-03 Comm Contractor/Rig No.: Doyon 25 PTD#: 2210240 DATE: 7/15/2021 ' Inspector Guy Cook Insp Source Operator: ConocoPhillips Alaska, Inc. Operator Rep: Rob Reinhardt/P. Castro Rig Rep: R. Fritts/O. Williams Inspector Type Operation: DRILL Sundry No: Test Pressures: Inspection No: bopGDC210714054210 Rams: Annular: Valves: MASP: Type Test: BIWKLY 250/3500 ' 250/3500 - 250/3500 - 2992 - Related Insp No: TEST DATA MISC. INSPECTIONS: MUD SYSTEM: ACCUMULATOR SYSTEM: P/F Visual Alarm Time/Pressure P/F Location Gen.: P - Trip Tank P P . System Pressure 3000 P Housekeeping: P_-_ Pit Level Indicators P P Pressure After Closure 1550 P " PTD On Location P Flow Indicator FP ✓ P " 200 PSI Attained 16 P Standing Order Posted P Meth Gas Detector P P Full Pressure Attained 100 P Well Sign P 142S Gas Detector P P Blind Switch Covers: All Stations P " Drl. Rig _P MS Misc NA NA- Nitgn. Bottles (avg): 6(d_)1841 _ -_P Hazard Sec. P ACC Misc 1 - FP Misc NA FLOOR SAFTY VALVES: BOP STACK: CHOKE MANIFOLD: Quantity PIF Quantity Size P/F Quantity P/F Upper Kelly 1 P-- Stripper 0 NA No. Valves 15 P - Lower Kelly I FP_� Annular Preventer -_1 - 13 5/8" 5000 -- P Manual Chokes 1 - P " Ball Type _ _ 2 ' P #1 Rams _I 2 7/8"x5.5" V-_P Hydraulic Chokes 1 P Inside BOP 1 P #2 Rams I_" Blind/shear - P CH Misc 0 NA_ FSV Misc 1 NA #3 Rams 1 2 7/8"x5.5" V P #4 Rams 0 NA #5 Rams _ 0 NA INSIDE REEL VALVES: #6 Rams 0 NA (Valid for Coil Rigs Only) Choke Ln. Valves 1 3 1/8" 5000 " P- Quantity P/F HCR Valves 2 3 1/8" 5000 P- Inside Reel Valves 0 NA Kill Line Valves 2 3 1/8" 5000 P Check Valve 0 _ NA BOP Misc 0 NA Number of Failures: 3 ✓ Test Results Test Time 16 Remarks: 4" and 4.5" test joints used for testing. Lower IBOP failed initial. Actuated valve and retested for a fail. Isolated the lower IBOP from the chart recorder during the retest on the high and continued the test for the rest of the components included in test #2. Both upper and lower IBOPs were changed out and tested good. During test #3 a leaky test fittin was found after troubleshooting MVs and not finding the leak. The fitting was changed out and we tested again for a pass. Flow indicator was not reading correctly, but the audible was sounding when it should. The indicator was calibrated and retested good. During -Fe repressuring of the accumulator during the draw -down test, one of the electric pumps did not start. The electrician fixed the issue and we started the draw -down test again and the accumulator passed. PRESSURE TEST SCHEDULE 7/15/21 4.5"Test Jt I. Annular, UIBOP, 4" KILL, CMV # 1,13,14,15 2. Upper Pipe Rams, LIBOP , Hcr kill, CMV # 2,10,12 3A. 4" Dart, Man Kill, CMV # 9,11, 6. 3B. "SAME" 4. 4" FOSV #1, CMV # 5,7,8. 5. 4" FOSV #2, CMV # 3 6. Lower Pipe Rams 4" Test Joint 7. Annular & HCR Choke 8. Upper Pipe Rams& Manual Choke 9. Lower Pipe Rams 10A. Super Choke 10B. Manually Operated Choke 11. UIBOP, Blinds &CMV #4 12A. LIBOP Low Pressure 12B. LIBOP High Pressure Tested 5 mins 250 low pressure, and 10 min 3500 psi high. Super Choke and Manually Operated choke tested to 2000 psi. Lower IBOP on test #2 failed and was replaced and retested on test # 12. CCc �, �� �c�� tr- jyc e I Tn I105-4 2� u fcj 4/4 From:WSC Operations Engineer To:Loepp, Victoria T (OGC) Subject:RE: [EXTERNAL]MT7-03 APPROVAL Date:Saturday, July 3, 2021 3:19:38 PM Thanks Victoria, Happy 4th of July! Scott From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Saturday, July 3, 2021 3:19 PM To: WSC Operations Engineer <wscopsengineer@conocophillips.com> Subject: [EXTERNAL]MT7-03 APPROVAL Scott, Approval is granted to proceed. Thanx, Victoria Sent from my iPhone On Jul 3, 2021, at 2:43 PM, WSC Operations Engineer <wscopsengineer@conocophillips.com> wrote:  Victoria, Yes the sand is hydrocarbon bearing. The second stage cement job design modeling showed that the job was designed to achieve proper mud removal, good displacement and isolation of the zone. The 2nd stage job execution was flawless with full returns during the entire job, we observed good lift pressure per the pumping report we sent earlier, and the equipment functioned as planned. So, both the design and execution point to a successful job. While it is hard to use this log to definitely prove isolation, the job planning and execution point to a successful job. We believe that over time, the cement would continue to gain compressive strength. Based on other criteria including job planning, execution, and historical Sonic log responses in 2nd stage jobs, we believe it will meet the requirements. Currently operations are tripping in the hole to drill out and will be ready to drill out the casing around 3PM today. We’ll await your response. Regards, Scott 907-748-2598 From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Saturday, July 3, 2021 11:53 AM To: WSC Operations Engineer <wscopsengineer@conocophillips.com> Subject: [EXTERNAL]MT7-03 Update Is the sand hydrocarbon bearing? Is it isolated? From: WSC Operations Engineer <wscopsengineer@conocophillips.com> Sent: Saturday, July 3, 2021 11:31 AM To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Cc: Njoku, Johnson <Johnson.Njoku@conocophillips.com>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com>; WSC Rig Advisor <wscrigadvisor@conocophillips.com>; Gorham, Brad <Brad.Gorham@conocophillips.com>; Hull, Celie <Cecilia.Hull@conocophillips.com>; Staples, Evan <Evan.Staples@conocophillips.com> Subject: RE: [EXTERNAL]RE: MT7-03 Update Victoria, The shoe is at 11,624’ MD and 8,304’ TVD and the TOC, by our interpretation, is at 11,050’ MD and 8,106’ TVD. This is 198’ TVD. The purpose of the second stage cement job was to isolate a sand we found in the HRZ section. The top of sand is 6,545’ TVDKB/8,666’ MD. The base of the sand is at 6,573’ TVDKB/8,706’ MD. Thank you, Polaris – WSC Operations Engineer Sydney Deering / Scott Kolstad wscopsengineer@conocophillips.com 907.263.4544 (Office) <image001.png> From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Saturday, July 3, 2021 11:13 AM To: WSC Operations Engineer <wscopsengineer@conocophillips.com> Subject: [EXTERNAL]RE: MT7-03 Update Also, what the TVD height of cement above the shoe? From: Loepp, Victoria T (CED) Sent: Saturday, July 3, 2021 11:08 AM To: WSC Operations Engineer <wscopsengineer@conocophillips.com> Subject: RE: MT7-03 Update Were there any zones above the Alpine C that required isolation? From: WSC Operations Engineer <wscopsengineer@conocophillips.com> Sent: Saturday, July 3, 2021 10:28 AM To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Cc: WSC Rig Advisor <wscrigadvisor@conocophillips.com>; Njoku, Johnson <Johnson.Njoku@conocophillips.com>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> Subject: RE: MT7-03 Update Victoria, MT7-03 is planned for injection into the Alpine C, and the first stage cement job will provide containment. The first stage job pumped 60.1 bbls of 15.8 ppg class G. There was a pressure increase about 88% though the displacement and the rate was reduced and displacement continued to plug bump. 10 bbls lost. The second stage went off as designed. A clean out BHA was picked up and the second stage drilled out. The casing was pressure tested successfully. Please see attached for the cement pumping report, the lift pressure analysis, and the SonicScope log with SLB’s top of cement. We also had our ConocoPhillips Cement SME, Dale Doherty, review the log and provide his interpretation below: “Stage 1, We appear to have near pristine cement to at least 11,050’ based on the very low amplitude. Based on the response this looks like very high quality cement capable of reliable isolation. Due to the loss of returns it now becomes difficult to ascertain the exact nature of the materials above this, although we can see differences in the materials behind pipe. Lift pressure analysis and fluid displacement predictions are not reliable when lost circulation events occur. Due to the amount and apparent high quality of the cement around the shoe I would consider it risky, if not hazardous, to attempt any type of remediation by way of perforations for an additional 100’ of isolation. Stage 2, I have reviewed the lift pressure analysis for stage II, along with the pre-job predictions. When I look at the pre-job predictions I look closely at the fluid friction pressure hierarchy chart. This chart tells if the fluids exert enough shear stress to displace the fluid(s) in front of it. In our case this is a very positive indicator that the fluid regime was in proper alignment for a good displacement. This if further enforced by the mud removal predictions and fluid concentration charts which predict a high percentage of cement in the annulus above the stage tool. Although not the best Cement Evaluation Log we have seen there are indications of a change in material in the annulus upward to 7,000’. This would be very close to the predicted top of spacer at 7400’. Additionally, we did not lose returns and the job was executed properly. Based on previous logs reviewed on the stage II operation I feel confident that our cement job is place as expected and will meet our expectations.” We are currently running in hole with our production BHA at approximately 4,000’ MD and are preparing to drill out the shoe, perform a LOT, and prepare for drilling ahead with the production lateral. Please let me know if you have any comments, questions, or concerns. Thank you, Polaris – WSC Operations Engineer Sydney Deering / Scott Kolstad wscopsengineer@conocophillips.com 907.263.4544 (Office) <image001.png> From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Friday, July 2, 2021 11:48 AM To: WSC Operations Engineer <wscopsengineer@conocophillips.com>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> Cc: WSC Rig Advisor <wscrigadvisor@conocophillips.com> Subject: [EXTERNAL]Re: MT7-03 Update CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. How did the cement job go? Please send cementing records as well as interpretation. Please email the log and call me to notify me it has been emailed. Include with the log submitted a log interpretation by the contractor analyst as well as a CPAI interpretation. Expected in this analysis are intervals and quality of cement as well as TOC determined by the log and cement job as well as any other information the log analyst can provide. My cell number is 907-242-9156 anytime. Thanx, Victoria Sent from my iPhone On Jul 2, 2021, at 11:35 AM, WSC Operations Engineer <wscopsengineer@conocophillips.com> wrote:  Hello! I want to touch base with you as we are going into the holiday weekend to confirm how you would prefer we get in touch with you? We are currently logging cement on MT7-03 and will be having a log for you, likely early tomorrow morning, and want to confirm if you would like us to call you or send a note? Thanks! Polaris – WSC Operations Engineer Sydney Deering / Scott Kolstad wscopsengineer@conocophillips.com 907.263.4544 (Office) <image001.png> From:WSC Operations Engineer To:Loepp, Victoria T (OGC) Cc:WSC Rig Advisor; Njoku, Johnson; Hobbs, Greg S Subject:RE: MT7-03 Update Date:Saturday, July 3, 2021 10:30:34 AM Attachments:image001.png CPAI_MT7-03_SonicScope_RM_TOC_0.3MD_4000-11422ft.Pdf MT7-03 Intermediate Lift Pressure Analysis for TOC.pdf MT7-03 INT CEMENT REPORT.pdf MT7-03 Intermediate csg test chart 7-2-2021.pdf Victoria, MT7-03 is planned for injection into the Alpine C, and the first stage cement job will provide containment. The first stage job pumped 60.1 bbls of 15.8 ppg class G. There was a pressure increase about 88% though the displacement and the rate was reduced and displacement continued to plug bump. 10 bbls lost. The second stage went off as designed. A clean out BHA was picked up and the second stage drilled out. The casing was pressure tested successfully. Please see attached for the cement pumping report, the lift pressure analysis, and the SonicScope log with SLB’s top of cement. We also had our ConocoPhillips Cement SME, Dale Doherty, review the log and provide his interpretation below: “Stage 1, We appear to have near pristine cement to at least 11,050’ based on the very low amplitude. Based on the response this looks like very high quality cement capable of reliable isolation. Due to the loss of returns it now becomes difficult to ascertain the exact nature of the materials above this, although we can see differences in the materials behind pipe. Lift pressure analysis and fluid displacement predictions are not reliable when lost circulation events occur. Due to the amount and apparent high quality of the cement around the shoe I would consider it risky, if not hazardous, to attempt any type of remediation by way of perforations for an additional 100’ of isolation. Stage 2, I have reviewed the lift pressure analysis for stage II, along with the pre-job predictions. When I look at the pre-job predictions I look closely at the fluid friction pressure hierarchy chart. This chart tells if the fluids exert enough shear stress to displace the fluid(s) in front of it. In our case this is a very positive indicator that the fluid regime was in proper alignment for a good displacement. This if further enforced by the mud removal predictions and fluid concentration charts which predict a high percentage of cement in the annulus above the stage tool. Although not the best Cement Evaluation Log we have seen there are indications of a change in material in the annulus upward to 7,000’. This would be very close to the predicted top of spacer at 7400’. Additionally, we did not lose returns and the job was executed properly. Based on previous logs reviewed on the stage II operation I feel confident that our cement job is place as expected and will meet our expectations.” We are currently running in hole with our production BHA at approximately 4,000’ MD and are preparing to drill out the shoe, perform a LOT, and prepare for drilling ahead with the production lateral. Please let me know if you have any comments, questions, or concerns. Thank you, Polaris – WSC Operations Engineer Sydney Deering / Scott Kolstad wscopsengineer@conocophillips.com 907.263.4544 (Office) From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Friday, July 2, 2021 11:48 AM To: WSC Operations Engineer <wscopsengineer@conocophillips.com>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> Cc: WSC Rig Advisor <wscrigadvisor@conocophillips.com> Subject: [EXTERNAL]Re: MT7-03 Update CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. How did the cement job go? Please send cementing records as well as interpretation. Please email the log and call me to notify me it has been emailed. Include with the log submitted a log interpretation by the contractor analyst as well as a CPAI interpretation. Expected in this analysis are intervals and quality of cement as well as TOC determined by the log and cement job as well as any other information the log analyst can provide. My cell number is 907-242-9156 anytime. Thanx, Victoria Sent from my iPhone On Jul 2, 2021, at 11:35 AM, WSC Operations Engineer <wscopsengineer@conocophillips.com> wrote: Hello! I want to touch base with you as we are going into the holiday weekend to confirm how you would prefer we get in touch with you? We are currently logging cement on MT7- 03 and will be having a log for you, likely early tomorrow morning, and want to confirm if you would like us to call you or send a note? Thanks! Polaris – WSC Operations Engineer Sydney Deering / Scott Kolstad wscopsengineer@conocophillips.com 907.263.4544 (Office) <image001.png> 1 WSC Operations Engineer To:Stephen Lauper; WSC Rig Advisor Cc:Drilling Supervisor, Doyon 25; Lauper, Stephen (Schlumberger) Subject:RE: [EXTERNAL]Re: [Ext] Lift Pressure Analysis for TOC From: Stephen Lauper <SLauper@slb.com> Sent: Friday, July 2, 2021 3:56 PM To: WSC Rig Advisor <wscrigadvisor@conocophillips.com> Cc: WSC Operations Engineer <wscopsengineer@conocophillips.com>; Drilling Supervisor, Doyon 25 <d25cm@conocophillips.com>; Lauper, Stephen (Schlumberger) <Stephen.Lauper@contractor.conocophillips.com> Subject: RE: [EXTERNAL]Re: [Ext] Lift Pressure Analysis for TOC Stage 2 Pressure Chart I was mainly trying to match the end of the job where cement would be lifting. Washout is 10% in the simulation below. It is hard to get it to match all sections appropriately without calipers, but I matched as close as I could the end section. Estimated TOC ~8005 06/29/2021 10:29:45 Cementing Job Report CemCAT v1.7 Well MT7-03 Field Mooses Tooth Engineer Jmorrison@slb.com Country United States Client CPAI SIR No. A.1012355.01.27 Job Type Intermediate Job Date 06-27-2021 Time 06/27/2021 07:28:36 06/28/2021 13:53:13 hh:mm:ss 23:02:38 00:03:00 01:03:00 02:03:00 03:03:00 04:03:00 05:03:00 06:03:00 07:03:00 08:03:00 09:03:00 10:03:00 11:03:00 12:03:00 13:03:00 13:53:13 PUMP PRESS PSI 0.00 1000 2000 3000 4000 5000 RATE B/M 0.00 2.0 4.0 6.0 8.0 10.0 DENSITY LB/G 5.0 9.0 13.0 17.0 21.0 25.0 RIG FLOOR PRESS PSI 0.00 1000 2000 3000 4000 5000 Messages BATCH UP SPACERR Reset Total, Vol = 3.13 bbl START SPACER Reset Total, Vol = 60.05 bbl CEMENT WET Reset Total, Vol = 61.09 bbl WATER BEHIND 20 BBLS Reset Total, Vol = 20.04 bbl STAGE TOOL OPEN RIG CIRCULATING BOTTOMS UP STAGE 1 CLOSING PLUG LANDED @ 4276 STROKES CEMENT SCALED 15.7 HEAVY FOR STAGE 1 Reset Total, Vol = 0.62 bbl BATCH UP SPACER START PUMPKING MUDPUSH Reset Total, Vol = 55.44 bbl CEMENT WET Reset Total, Vol = 51.21 bbl LOADING PLUG WATER BEHIND BUMPED PLUG 3196 STROKES Stopped Acquisition Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Location (legal) MT7 Schlumberger Location Prudhoe Other Job Start Jun/27/2021 Field Mooses Tooth Formation Name/Type Deviation deg Bit Size in Well MD ft Well TVD ft County North Slope State/Province Alaska Well Master 0066335619 API/UWI 50103208300000 BHP psi BHST degF BHCT degF Pore Press. Gradient lb/gal Rig Name DOYON 25 Drilled For Oil & Gas Service Via Land Offshore Zone Well Class New Well Type Development Drilling Fluid Type Max. Density lb/gal Plastic Viscosity cP Service Line Cementing Job Type Intermediate Max. Allowed Tub. Press psi Max. Allowed Ann. Press psi WH Connection Service Instructions Treat Down Displacement bbl Packer Type Packer Depth ft Tubing Vol. bbl Casing Vol. bbl Annular Vol. bbl Openhole Vol. bbl Casing/Tubing Secured 1 Hole Vol. Circulated prior to Cement X Casing Tools Squeeze Job Lift Pressure psi Shoe Type Float Squeeze Type Pipe Rotated Pipe Reciprocated Shoe Depth 11621.0 ft Tool Type No. Centralizers 95 Top Plugs 1 Bottom Plugs 1 Stage Tool Type HES CEMENTER Tool Depth ft Cement Head Type Stage Tool Depth 8756.0 ft Tail Pipe Size in Job Scheduled For Jun/27/2021 Arrived on Location Jun/27/2021 Leave Location Jun/27/2021 Collar Type Float Tail Pipe Depth ft Collar Depth 11493.0 ft Sqz. Total Vol. bbl Casing/Liner Depth, ft Size, in Weight, lb/ft Grade Thread Tubing/Drill Pipe T/D Depth, ft Size, in Weight, lb/ft Grade Thread Perforations/Open Hole Top, ft Bottom, ft shot/ft No. of Shots Total Interval ft ft ft ft ft Diameter in ft ft Cementing Service Report Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 07:28:36 -10 -3667 0.0 -0.00 0.0 0.0 Started Acquisition 06/27/2021 07:28:56 -12 -3669 0.0 0.00 0.0 0.0 06/27/2021 07:29:09 -11 -3669 0.0 -0.00 0.0 0.0 ON LOCATION @ 0700 06/27/2021 07:29:16 -10 -3669 0.0 0.00 0.0 0.0 06/27/2021 07:29:36 -12 -3671 0.0 0.00 0.0 0.0 06/27/2021 07:29:56 -9 -3671 0.0 0.00 0.0 0.0 06/27/2021 07:30:16 -9 -3669 0.0 -0.00 0.0 0.0 06/27/2021 07:30:36 -9 -3670 0.0 0.00 0.0 0.0 06/27/2021 07:30:56 -8 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:31:16 -10 -3668 0.0 -0.00 0.0 0.0 06/27/2021 07:31:36 -10 -3669 0.0 -0.00 0.0 0.0 06/27/2021 07:31:56 -7 -3668 0.0 -0.00 0.0 0.0 06/27/2021 07:32:16 -7 -3668 0.0 -0.00 0.0 0.0 06/27/2021 07:32:36 -5 -3671 0.0 0.00 0.0 0.0 06/27/2021 07:32:56 -7 -3669 0.0 -0.00 0.0 0.0 06/27/2021 07:33:16 -7 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:33:36 -6 -3668 0.0 -0.00 0.0 0.0 06/27/2021 07:33:56 -6 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:34:16 -5 -3669 0.0 -0.00 0.0 0.0 06/27/2021 07:34:36 -11 -3669 0.0 0.00 0.0 0.0 06/27/2021 07:34:56 -8 -3670 0.0 -0.00 0.0 0.0 Page 1 of 101 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Location (legal) MT7 Schlumberger Location Prudhoe Other Job Start Jun/27/2021 Field Mooses Tooth Formation Name/Type Deviation deg Bit Size in Well MD ft Well TVD ft County North Slope State/Province Alaska Well Master 0066335619 API/UWI 50103208300000 BHP psi BHST degF BHCT degF Pore Press. Gradient lb/gal Rig Name DOYON 25 Drilled For Oil & Gas Service Via Land Offshore Zone Well Class New Well Type Development Drilling Fluid Type Max. Density lb/gal Plastic Viscosity cP Service Line Cementing Job Type Intermediate Max. Allowed Tub. Press psi Max. Allowed Ann. Press psi WH Connection Service Instructions Treat Down Displacement bbl Packer Type Packer Depth ft Tubing Vol. bbl Casing Vol. bbl Annular Vol. bbl Openhole Vol. bbl Casing/Tubing Secured 1 Hole Vol. Circulated prior to Cement X Casing Tools Squeeze Job Lift Pressure psi Shoe Type Float Squeeze Type Pipe Rotated Pipe Reciprocated Shoe Depth 11621.0 ft Tool Type No. Centralizers 95 Top Plugs 1 Bottom Plugs 1 Stage Tool Type HES CEMENTER Tool Depth ft Cement Head Type Stage Tool Depth 8756.0 ft Tail Pipe Size in Job Scheduled For Jun/27/2021 Arrived on Location Jun/27/2021 Leave Location Jun/27/2021 Collar Type Float Tail Pipe Depth ft Collar Depth 11493.0 ft Sqz. Total Vol. bbl Casing/Liner Depth, ft Size, in Weight, lb/ft Grade Thread Tubing/Drill Pipe T/D Depth, ft Size, in Weight, lb/ft Grade Thread Perforations/Open Hole Top, ft Bottom, ft shot/ft No. of Shots Total Interval ft ft ft ft ft Diameter in ft ft Cementing Service Report Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 07:35:36 -9 -3670 0.0 -0.00 0.0 0.0 06/27/2021 07:35:56 -9 -3667 0.0 0.00 0.0 0.0 06/27/2021 07:36:16 -5 -3669 0.0 -0.00 0.0 0.0 06/27/2021 07:36:36 -9 -3670 0.0 0.00 0.0 0.0 06/27/2021 07:36:56 -10 -3672 0.0 -0.00 0.0 0.0 06/27/2021 07:37:16 -9 -3670 0.0 0.00 0.0 0.0 06/27/2021 07:37:36 -9 -3669 0.0 0.00 0.0 0.0 06/27/2021 07:37:56 -11 -3669 0.0 0.00 0.0 0.0 06/27/2021 07:38:16 -11 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:38:36 -9 -3670 0.0 0.00 0.0 0.0 06/27/2021 07:38:56 -10 -3668 0.0 -0.00 0.0 0.0 06/27/2021 07:39:16 -10 -3672 0.0 -0.00 0.0 0.0 06/27/2021 07:39:36 -9 -3670 0.0 -0.00 0.0 0.0 06/27/2021 07:39:56 -9 -3672 0.0 -0.00 0.0 0.0 06/27/2021 07:40:16 -12 -3672 0.0 -0.00 0.0 0.0 06/27/2021 07:40:36 -8 -3673 0.0 0.00 0.0 0.0 06/27/2021 07:40:56 -10 -3672 0.0 0.00 0.0 0.0 06/27/2021 07:41:16 -7 -3667 0.0 0.00 0.0 0.0 06/27/2021 07:41:36 -5 -3669 0.0 0.00 0.0 0.0 06/27/2021 07:41:56 -9 -3670 0.0 0.00 0.0 0.0 06/27/2021 07:42:16 -12 -3670 0.0 -0.00 0.0 0.0 06/27/2021 07:42:36 -8 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:42:56 -10 -3670 0.0 -0.00 0.0 0.0 06/27/2021 07:43:16 -7 -3669 0.0 -0.00 0.0 0.0 06/27/2021 07:43:36 -7 -3667 0.0 -0.00 0.0 0.0 06/27/2021 07:43:56 -8 -3669 0.0 0.00 0.0 0.0 06/27/2021 07:44:16 -11 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:44:36 -8 -3669 0.0 0.00 0.0 0.0 06/27/2021 07:44:56 -11 -3669 0.0 -0.00 0.0 0.0 06/27/2021 07:45:16 -8 -3669 0.0 -0.00 0.0 0.0 06/27/2021 07:45:36 -12 -3670 0.0 -0.00 0.0 0.0 06/27/2021 07:45:56 -9 -3668 0.0 0.00 0.0 0.0 06/27/2021 07:46:16 -9 -3668 0.0 -0.00 0.0 0.0 06/27/2021 07:46:36 -9 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:46:56 -11 -3670 0.0 -0.00 0.0 0.0 06/27/2021 07:47:16 -11 -3670 0.0 -0.00 0.0 0.0 06/27/2021 07:47:36 -9 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:47:56 -10 -3670 0.0 -0.00 0.0 0.0 06/27/2021 07:48:16 -9 -3669 0.0 0.00 0.0 0.0 06/27/2021 07:48:36 -6 -3668 0.0 -0.00 0.0 0.0 06/27/2021 07:48:56 -11 -3670 0.0 -0.00 0.0 0.0 06/27/2021 07:49:16 -8 -3672 0.0 -0.00 0.0 0.0 06/27/2021 07:49:36 -12 -3669 0.0 -0.00 0.0 0.0 06/27/2021 07:49:56 -11 -3671 0.0 0.00 0.0 0.0 06/27/2021 07:50:16 -7 -3665 0.0 0.00 0.0 0.0 06/27/2021 07:50:36 -10 -3669 0.0 0.00 0.0 0.0 06/27/2021 07:50:56 -9 -3670 0.0 -0.00 0.0 0.0 06/27/2021 07:51:16 -9 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:51:36 -7 -3672 0.0 -0.00 0.0 0.0 06/27/2021 07:51:56 -8 -3670 0.0 -0.00 0.0 0.0 06/27/2021 07:52:16 -10 -3668 0.0 -0.00 0.0 0.0 06/27/2021 07:52:36 -10 -3672 0.0 0.00 0.0 0.0 06/27/2021 07:52:56 -9 -3669 0.0 -0.00 0.0 0.0 06/27/2021 07:53:16 -9 -3668 0.0 -0.00 0.0 0.0 Page 2 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 07:53:56 -10 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:54:16 -9 -3672 0.0 -0.00 0.0 0.0 06/27/2021 07:54:36 -10 -3669 0.0 -0.00 0.0 0.0 06/27/2021 07:54:56 -10 -3671 0.0 0.00 0.0 0.0 06/27/2021 07:55:16 -10 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:55:36 -9 -3670 0.0 -0.00 0.0 0.0 06/27/2021 07:55:56 -8 -3673 0.0 0.00 0.0 0.0 06/27/2021 07:56:16 -10 -3671 0.0 -0.01 0.0 0.0 06/27/2021 07:56:36 -7 -3669 0.0 -0.00 0.0 0.0 06/27/2021 07:56:56 -10 -3669 0.0 0.00 0.0 0.0 06/27/2021 07:57:16 -9 -3668 0.0 -0.00 0.0 0.0 06/27/2021 07:57:36 -8 -3672 0.0 -0.00 0.0 0.0 06/27/2021 07:57:56 -9 -3668 0.0 0.00 0.0 0.0 06/27/2021 07:58:16 -10 -3669 0.0 -0.00 0.0 0.0 06/27/2021 07:58:36 -8 -3670 0.0 -0.00 0.0 0.0 06/27/2021 07:58:56 -7 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:59:16 -7 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:59:36 -10 -3671 0.0 -0.00 0.0 0.0 06/27/2021 07:59:56 -8 -3670 0.0 -0.00 0.0 0.0 06/27/2021 08:00:16 -12 -3671 0.0 0.00 0.0 0.0 06/27/2021 08:00:36 -10 -3670 0.0 -0.00 0.0 0.0 06/27/2021 08:00:56 -10 -3668 0.0 -0.00 0.0 0.0 06/27/2021 08:01:16 -10 -3669 0.0 0.01 0.0 0.0 06/27/2021 08:01:36 -12 -3671 0.0 -0.00 0.0 0.0 06/27/2021 08:01:56 -5 -3673 0.0 -0.00 0.0 0.0 06/27/2021 08:02:16 -9 -3668 0.0 -0.00 0.0 0.0 06/27/2021 08:02:36 -9 -3672 0.0 -0.00 0.0 0.0 06/27/2021 08:02:56 -9 -3670 0.0 -0.00 0.0 0.0 06/27/2021 08:03:16 -8 -3667 0.0 0.00 0.0 0.0 06/27/2021 08:03:36 -8 -3668 0.0 0.00 0.0 0.0 06/27/2021 08:03:56 -10 -3667 0.0 0.00 0.0 0.0 06/27/2021 08:04:16 -9 -3671 0.0 -0.00 0.0 0.0 06/27/2021 08:04:36 -8 -3665 0.0 -0.00 0.0 0.0 06/27/2021 08:04:56 -9 -3672 0.0 -0.00 0.0 0.0 06/27/2021 08:05:16 -10 -3668 0.0 -0.00 0.0 0.0 06/27/2021 08:05:36 -12 -3672 0.0 -0.00 0.0 0.0 06/27/2021 08:05:56 -9 -3669 0.0 -0.00 0.0 0.0 06/27/2021 08:06:16 -11 -3670 0.0 -0.00 0.0 0.0 06/27/2021 08:06:36 -9 -3669 0.0 0.00 0.0 0.0 06/27/2021 08:06:56 -11 -3669 0.0 -0.00 0.0 0.0 06/27/2021 08:07:16 -10 -3670 0.0 -0.00 0.0 0.0 06/27/2021 08:07:36 -11 -3669 0.0 -0.00 0.0 0.0 06/27/2021 08:07:56 -9 -3668 0.0 0.00 0.0 0.0 06/27/2021 08:08:16 -9 -3671 0.0 -0.00 0.0 0.0 06/27/2021 08:08:36 -10 -3670 0.0 -0.00 0.0 0.0 06/27/2021 08:08:56 -9 -3669 0.0 -0.00 0.0 0.0 06/27/2021 08:09:16 -11 -3671 0.0 0.00 0.0 0.0 06/27/2021 08:09:36 -12 -3666 0.0 -0.00 0.0 0.0 06/27/2021 08:09:56 -9 -3670 0.0 0.00 0.0 0.0 06/27/2021 08:10:16 -10 -3670 0.0 0.00 0.0 0.0 06/27/2021 08:10:36 -12 -3672 0.0 -0.00 0.0 0.0 06/27/2021 08:10:56 -9 -3670 0.0 0.00 0.0 0.0 06/27/2021 08:11:16 -10 -3669 0.0 -0.00 0.0 0.0 06/27/2021 08:11:36 -11 -3669 0.0 0.00 0.0 0.0 Page 3 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 08:12:16 -12 -3669 0.0 -0.00 0.0 0.0 06/27/2021 08:12:36 -10 -3671 0.0 -0.00 0.0 0.0 06/27/2021 08:12:56 -12 -3671 0.0 0.00 0.0 0.0 06/27/2021 08:13:16 -11 -3670 0.0 0.00 0.0 0.0 06/27/2021 08:13:36 -10 -3669 0.0 0.00 0.0 0.0 06/27/2021 08:13:56 -13 -3669 0.0 0.00 0.0 0.0 06/27/2021 08:14:16 -12 -3669 0.0 0.00 0.0 0.0 06/27/2021 08:14:36 -9 -3670 0.0 0.00 0.0 0.0 06/27/2021 08:14:56 -10 -3668 0.0 -0.00 0.0 0.0 06/27/2021 08:15:16 -8 -3669 0.0 -0.00 0.0 0.0 06/27/2021 08:15:36 -5 -3670 0.0 -0.00 0.0 0.0 06/27/2021 08:15:56 -8 -3669 0.0 -0.00 0.0 0.0 06/27/2021 08:16:16 -12 -3672 0.0 -0.00 0.0 0.0 06/27/2021 08:16:36 -7 -3667 0.0 0.00 0.0 0.0 06/27/2021 08:16:56 -10 -3669 0.0 0.00 0.0 0.0 06/27/2021 08:17:16 -10 -3671 0.0 0.00 0.0 0.0 06/27/2021 08:17:36 -9 -3670 0.0 0.00 0.0 0.0 06/27/2021 08:17:56 -12 -3670 0.0 -0.00 0.0 0.0 06/27/2021 08:18:16 -12 -3670 0.0 -0.00 0.0 0.0 06/27/2021 08:18:36 -10 118 0.0 0.00 0.0 0.0 06/27/2021 08:18:56 5 112 0.0 -0.01 0.0 0.0 06/27/2021 08:19:16 -11 120 0.0 -0.01 0.0 0.0 06/27/2021 08:19:36 -8 115 0.0 0.00 0.0 0.0 06/27/2021 08:19:56 -8 111 0.0 -0.00 0.0 0.0 06/27/2021 08:20:16 -9 112 0.0 -0.00 0.0 0.0 06/27/2021 08:20:36 -8 124 0.0 -0.00 0.0 0.0 06/27/2021 08:20:56 -5 156 0.0 -0.00 0.0 0.0 06/27/2021 08:21:16 -9 118 0.0 0.00 0.0 0.0 06/27/2021 08:21:36 -7 118 0.0 0.00 0.0 0.0 06/27/2021 08:21:56 -11 126 0.0 -0.00 0.0 0.0 06/27/2021 08:22:16 -5 113 0.0 -0.00 0.0 0.0 06/27/2021 08:22:36 -7 123 0.0 0.00 0.0 0.0 06/27/2021 08:22:56 -7 115 0.0 -0.00 0.0 0.0 06/27/2021 08:23:16 -6 109 0.0 -0.00 0.0 0.0 06/27/2021 08:23:36 -8 109 0.0 0.00 0.0 0.0 06/27/2021 08:23:56 -7 102 0.0 0.00 0.0 0.0 06/27/2021 08:24:16 -9 100 0.0 -0.00 0.0 0.0 06/27/2021 08:24:36 -9 108 0.0 0.00 0.0 0.0 06/27/2021 08:24:56 -5 127 0.0 0.00 0.0 0.0 06/27/2021 08:25:16 -4 148 0.0 -0.00 0.0 0.0 06/27/2021 08:25:36 -3 140 0.0 -0.00 0.0 0.0 06/27/2021 08:25:56 -7 116 0.0 0.00 0.0 0.0 06/27/2021 08:26:16 -8 110 0.0 0.00 0.0 0.0 06/27/2021 08:26:36 -5 124 0.0 -0.00 0.0 0.0 06/27/2021 08:26:56 -2 151 0.0 -0.00 0.0 0.0 06/27/2021 08:27:16 -3 149 0.0 -0.00 0.0 0.0 06/27/2021 08:27:36 -1 161 0.0 -0.00 0.0 0.0 06/27/2021 08:27:56 -6 120 0.0 -0.00 0.0 0.0 06/27/2021 08:28:16 -10 122 0.0 -0.00 0.0 0.0 06/27/2021 08:28:36 -3 154 0.0 -0.00 0.0 0.0 06/27/2021 08:28:56 -1 136 0.0 -0.00 0.0 0.0 06/27/2021 08:29:16 -7 109 0.0 -0.00 0.0 0.0 06/27/2021 08:29:36 -7 105 0.0 -0.00 0.0 0.0 06/27/2021 08:29:56 -4 131 0.0 0.00 0.0 0.0 Page 4 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 08:30:36 3 138 0.0 -0.00 0.0 0.0 06/27/2021 08:30:56 11 164 0.0 0.00 0.0 0.0 06/27/2021 08:31:16 27 136 0.0 -0.00 0.0 0.0 06/27/2021 08:31:36 27 114 0.0 -0.00 0.0 0.0 06/27/2021 08:31:56 70 188 0.0 0.00 0.0 0.0 06/27/2021 08:32:16 50 123 0.0 -0.00 0.0 0.0 06/27/2021 08:32:36 -11 112 0.0 0.00 0.0 0.0 06/27/2021 08:32:56 146 138 0.0 -0.00 0.0 0.0 06/27/2021 08:33:16 139 119 0.0 -0.00 0.0 0.0 06/27/2021 08:33:36 141 111 0.0 0.00 0.0 0.0 06/27/2021 08:33:56 142 115 0.0 -0.00 0.0 0.0 06/27/2021 08:34:16 148 124 0.0 -0.00 0.0 0.0 06/27/2021 08:34:36 54 107 0.0 -0.00 0.0 0.0 06/27/2021 08:34:56 10 158 0.0 -0.00 0.0 0.0 06/27/2021 08:35:16 -0 134 0.0 0.00 0.0 0.0 06/27/2021 08:35:36 -5 116 0.0 -0.00 0.0 0.0 06/27/2021 08:35:56 -6 104 0.0 -0.00 0.0 0.0 06/27/2021 08:36:16 -6 104 0.0 -0.00 0.0 0.0 06/27/2021 08:36:36 -4 115 0.0 -0.00 0.0 0.0 06/27/2021 08:36:56 -7 106 0.0 -0.00 0.0 0.0 06/27/2021 08:37:16 1 130 0.0 -0.00 0.0 0.0 06/27/2021 08:37:36 -7 111 0.0 -0.00 0.0 0.0 06/27/2021 08:37:56 11 162 0.0 0.00 0.0 0.0 06/27/2021 08:38:16 -9 110 0.0 0.00 0.0 0.0 06/27/2021 08:38:36 18 177 0.0 -0.00 0.0 0.0 06/27/2021 08:38:56 -2 124 0.0 -0.00 0.0 0.0 06/27/2021 08:39:16 -4 134 0.0 0.00 0.0 0.0 06/27/2021 08:39:36 1 138 0.0 -0.00 0.0 0.0 06/27/2021 08:39:56 -4 109 0.0 0.00 0.0 0.0 06/27/2021 08:40:16 -7 110 0.0 -0.00 0.0 0.0 06/27/2021 08:40:36 -6 102 0.0 0.00 0.0 0.0 06/27/2021 08:40:56 4 149 0.0 -0.00 0.0 0.0 06/27/2021 08:41:16 -9 109 0.0 -0.00 0.0 0.0 06/27/2021 08:41:36 -6 114 0.0 0.00 0.0 0.0 06/27/2021 08:41:56 -2 116 0.0 -0.00 0.0 0.0 06/27/2021 08:42:16 -0 119 0.0 -0.00 0.0 0.0 06/27/2021 08:42:36 142 112 0.0 -0.00 0.0 0.0 06/27/2021 08:42:56 142 108 0.0 -0.00 0.0 0.0 06/27/2021 08:43:16 3 110 0.0 -0.00 0.0 0.0 06/27/2021 08:43:36 6 113 0.0 0.00 0.0 0.0 06/27/2021 08:43:56 5 108 0.0 -0.00 0.0 0.0 06/27/2021 08:44:16 124 110 0.0 -0.00 0.0 0.0 06/27/2021 08:44:36 122 106 0.0 0.01 0.0 0.0 06/27/2021 08:44:56 121 106 0.0 -0.00 0.0 0.0 06/27/2021 08:45:16 -1 108 0.0 -0.00 0.0 0.0 06/27/2021 08:45:36 -1 113 0.0 0.00 0.0 0.0 06/27/2021 08:45:56 -5 104 0.0 -0.00 0.0 0.0 06/27/2021 08:46:16 -7 105 0.0 0.00 0.0 0.0 06/27/2021 08:46:36 -6 107 0.0 -0.00 0.0 0.0 06/27/2021 08:46:56 -7 105 0.0 -0.00 0.0 0.0 06/27/2021 08:47:16 -0 118 0.0 0.00 0.0 0.0 06/27/2021 08:47:36 -7 101 0.0 -0.00 0.0 0.0 06/27/2021 08:47:56 7 143 0.0 0.00 0.0 0.0 06/27/2021 08:48:16 24 119 0.0 0.00 0.0 0.0 Page 5 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 08:48:56 18 130 0.0 -0.00 0.0 0.0 06/27/2021 08:49:16 9 103 0.0 -0.00 0.0 0.0 06/27/2021 08:49:36 14 105 0.0 0.00 0.0 0.0 06/27/2021 08:49:56 122 110 0.0 -0.00 0.0 0.0 06/27/2021 08:50:16 125 113 0.0 0.00 0.0 0.0 06/27/2021 08:50:36 3 102 0.0 -0.00 0.0 0.0 06/27/2021 08:50:56 -3 105 0.0 -0.00 0.0 0.0 06/27/2021 08:51:16 -4 108 0.0 -0.00 0.0 0.0 06/27/2021 08:51:36 -6 103 0.0 -0.00 0.0 0.0 06/27/2021 08:51:56 142 104 0.0 -0.00 0.0 0.0 06/27/2021 08:52:16 71 108 0.0 -0.00 0.0 0.0 06/27/2021 08:52:36 -3 113 0.0 0.00 0.0 0.0 06/27/2021 08:52:56 47 110 0.0 0.00 0.0 0.0 06/27/2021 08:53:16 69 104 0.0 0.00 0.0 0.0 06/27/2021 08:53:36 -5 113 0.0 -0.00 0.0 0.0 06/27/2021 08:53:56 -4 111 0.0 0.00 0.0 0.0 06/27/2021 08:54:16 6 147 0.0 -0.00 0.0 0.0 06/27/2021 08:54:36 5 140 0.0 0.00 0.0 0.0 06/27/2021 08:54:56 -3 114 0.0 -0.00 0.0 0.0 06/27/2021 08:55:16 -1 129 0.0 -0.00 0.0 0.0 06/27/2021 08:55:36 -1 115 0.0 0.00 0.0 0.0 06/27/2021 08:55:56 -4 117 0.0 -0.00 0.0 0.0 06/27/2021 08:56:16 -5 105 0.0 -0.00 0.0 0.0 06/27/2021 08:56:36 -6 106 0.0 -0.00 0.0 0.0 06/27/2021 08:56:56 -7 127 0.0 -0.00 0.0 0.0 06/27/2021 08:57:16 -6 106 0.0 -0.00 0.0 0.0 06/27/2021 08:57:36 5 139 0.0 -0.00 0.0 0.0 06/27/2021 08:57:56 0 123 0.0 -0.00 0.0 0.0 06/27/2021 08:58:16 -6 109 0.0 -0.00 0.0 0.0 06/27/2021 08:58:36 -4 109 0.0 0.00 0.0 0.0 06/27/2021 08:58:56 3 143 0.0 -0.00 0.0 0.0 06/27/2021 08:59:16 7 146 0.0 0.00 0.0 0.0 06/27/2021 08:59:36 3 137 0.0 0.00 0.0 0.0 06/27/2021 08:59:56 -3 114 0.0 0.00 0.0 0.0 06/27/2021 09:00:16 2 117 0.0 -0.00 0.0 0.0 06/27/2021 09:00:36 -2 112 0.0 -0.00 0.0 0.0 06/27/2021 09:00:56 -3 108 0.0 -0.00 0.0 0.0 06/27/2021 09:01:16 -3 110 0.0 0.00 0.0 0.0 06/27/2021 09:01:36 -4 110 0.0 4.50 0.0 0.0 06/27/2021 09:01:56 -3 99 0.0 8.25 0.0 0.0 06/27/2021 09:02:16 -1 108 0.0 8.27 0.0 0.0 06/27/2021 09:02:36 -2 113 0.0 8.27 0.0 0.0 06/27/2021 09:02:56 -0 112 0.0 8.30 0.0 0.0 06/27/2021 09:03:16 4 116 0.0 8.30 0.0 0.0 06/27/2021 09:03:36 83 110 0.0 8.29 0.0 0.0 06/27/2021 09:03:56 93 108 0.0 8.30 0.0 0.0 06/27/2021 09:04:16 78 113 0.0 8.29 0.0 0.0 06/27/2021 09:04:36 56 118 0.0 8.31 0.0 0.0 06/27/2021 09:04:56 50 116 0.0 8.26 0.0 0.0 06/27/2021 09:05:16 53 108 0.0 8.23 0.0 0.0 06/27/2021 09:05:36 59 114 0.0 8.24 0.0 0.0 06/27/2021 09:05:56 55 112 0.0 8.25 0.0 0.0 06/27/2021 09:06:16 62 116 0.0 8.24 0.0 0.0 06/27/2021 09:06:36 56 111 0.0 8.25 0.0 0.0 Page 6 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 09:07:16 57 123 0.0 8.26 0.0 0.0 06/27/2021 09:07:36 82 116 0.0 8.27 0.0 0.0 06/27/2021 09:07:56 87 116 0.0 8.20 0.0 0.0 06/27/2021 09:08:16 17 113 0.0 8.17 0.0 0.0 06/27/2021 09:08:36 5 108 0.0 8.16 0.0 0.0 06/27/2021 09:08:56 7 110 0.0 8.15 0.0 0.0 06/27/2021 09:09:16 4 112 0.0 8.14 0.0 0.0 06/27/2021 09:09:36 1 110 0.0 8.14 0.0 0.0 06/27/2021 09:09:56 2 114 0.0 8.15 0.0 0.0 06/27/2021 09:10:16 -0 111 0.0 8.14 0.0 0.0 06/27/2021 09:10:36 0 112 0.0 8.14 0.0 0.0 06/27/2021 09:10:56 6 118 0.0 8.14 0.0 0.0 06/27/2021 09:11:16 45 118 0.0 8.27 0.0 0.0 06/27/2021 09:11:36 59 112 0.0 8.30 0.0 0.0 06/27/2021 09:11:56 60 115 0.0 8.27 0.0 0.0 06/27/2021 09:12:16 79 118 0.0 8.29 0.0 0.0 06/27/2021 09:12:36 88 123 0.0 8.30 0.0 0.0 06/27/2021 09:12:56 83 106 0.0 8.29 0.0 0.0 06/27/2021 09:13:16 81 111 0.0 8.29 0.0 0.0 06/27/2021 09:13:36 9 105 0.0 8.29 0.0 0.0 06/27/2021 09:13:56 4 117 0.0 8.29 0.0 0.0 06/27/2021 09:14:16 1 98 0.0 8.29 0.0 0.0 06/27/2021 09:14:36 2 118 0.0 8.30 0.0 0.0 06/27/2021 09:14:56 1 114 0.0 8.29 0.0 0.0 06/27/2021 09:15:16 0 115 0.0 8.30 0.0 0.0 06/27/2021 09:15:36 1 121 0.0 8.30 0.0 0.0 06/27/2021 09:15:49 1 112 0.0 8.30 0.0 0.0 unit primed 06/27/2021 09:15:56 -2 112 0.0 8.29 0.0 0.0 06/27/2021 09:16:11 -2 113 0.0 8.29 0.0 0.0 RECEIVED AIR FROM FLOOR 06/27/2021 09:16:16 1 109 0.0 8.29 0.0 0.0 06/27/2021 09:16:36 0 123 0.0 8.30 0.0 0.0 06/27/2021 09:16:56 -2 111 0.0 8.29 0.0 0.0 06/27/2021 09:17:16 11 147 0.0 8.29 0.0 0.0 06/27/2021 09:17:36 9 138 0.0 8.30 0.0 0.0 06/27/2021 09:17:56 5 124 0.0 8.30 0.0 0.0 06/27/2021 09:18:16 5 114 0.0 8.30 0.0 0.0 06/27/2021 09:18:36 1 116 0.0 8.30 0.0 0.0 06/27/2021 09:18:56 -1 113 0.0 8.30 0.0 0.0 06/27/2021 09:19:16 15 178 0.0 8.30 0.0 0.0 06/27/2021 09:19:36 8 152 0.0 8.30 0.0 0.0 06/27/2021 09:19:56 -1 110 0.0 8.30 0.0 0.0 06/27/2021 09:20:16 1 122 0.0 8.30 0.0 0.0 06/27/2021 09:20:36 -1 117 0.0 8.30 0.0 0.0 06/27/2021 09:20:56 6 138 0.0 8.30 0.0 0.0 06/27/2021 09:21:16 -5 96 0.0 8.30 0.0 0.0 06/27/2021 09:21:36 4 122 0.0 8.30 0.0 0.0 06/27/2021 09:21:56 4 128 0.0 8.30 0.0 0.0 06/27/2021 09:22:16 12 165 0.0 8.30 0.0 0.0 06/27/2021 09:22:36 9 151 0.0 8.30 0.0 0.0 06/27/2021 09:22:56 -1 115 0.0 8.30 0.0 0.0 06/27/2021 09:23:16 -4 103 0.0 8.30 0.0 0.0 06/27/2021 09:23:36 -2 106 0.0 8.30 0.0 0.0 06/27/2021 09:23:56 -2 111 0.0 8.30 0.0 0.0 06/27/2021 09:24:16 -6 92 0.0 8.30 0.0 0.0 Page 7 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 09:24:56 1 119 0.0 8.30 0.0 0.0 06/27/2021 09:25:16 1 121 0.0 8.30 0.0 0.0 06/27/2021 09:25:36 8 160 0.0 8.30 0.0 0.0 06/27/2021 09:25:56 6 134 0.0 8.30 0.0 0.0 06/27/2021 09:26:16 -5 105 0.0 8.30 0.0 0.0 06/27/2021 09:26:36 7 153 0.0 8.30 0.0 0.0 06/27/2021 09:26:56 -9 97 0.0 8.30 0.0 0.0 06/27/2021 09:27:16 -7 94 0.0 8.30 0.0 0.0 06/27/2021 09:27:36 6 128 0.0 8.30 0.0 0.0 06/27/2021 09:27:56 -1 127 0.0 8.30 0.0 0.0 06/27/2021 09:28:16 -4 97 0.0 8.30 0.0 0.0 06/27/2021 09:28:36 3 127 0.0 8.30 0.0 0.0 06/27/2021 09:28:56 1 118 0.0 8.30 0.0 0.0 06/27/2021 09:29:16 -6 98 0.0 8.30 0.0 0.0 06/27/2021 09:29:36 -9 100 0.0 8.30 0.0 0.0 06/27/2021 09:29:56 -6 109 0.0 8.30 0.0 0.0 06/27/2021 09:30:16 -6 100 0.0 8.30 0.0 0.0 06/27/2021 09:30:36 -9 103 0.0 8.30 0.0 0.0 06/27/2021 09:30:56 -4 101 0.0 8.30 0.0 0.0 06/27/2021 09:31:16 -3 112 0.0 8.30 0.0 0.0 06/27/2021 09:31:36 6 146 0.0 8.30 0.0 0.0 06/27/2021 09:31:56 -1 107 0.0 8.30 0.0 0.0 06/27/2021 09:32:16 1 114 0.0 8.30 0.0 0.0 06/27/2021 09:32:36 -6 99 0.0 8.30 0.0 0.0 06/27/2021 09:32:56 -6 97 0.0 8.30 0.0 0.0 06/27/2021 09:33:16 -7 95 0.0 8.30 0.0 0.0 06/27/2021 09:33:36 0 121 0.0 8.30 0.0 0.0 06/27/2021 09:33:56 -4 98 0.0 8.30 0.0 0.0 06/27/2021 09:34:16 5 131 0.0 8.30 0.0 0.0 06/27/2021 09:34:36 1 128 0.0 8.29 0.0 0.0 06/27/2021 09:34:56 6 145 0.0 8.30 0.0 0.0 06/27/2021 09:35:16 0 114 0.0 8.30 0.0 0.0 06/27/2021 09:35:36 1 107 0.0 8.30 0.0 0.0 06/27/2021 09:35:56 -5 101 0.0 8.30 0.0 0.0 06/27/2021 09:36:16 -5 99 0.0 8.30 0.0 0.0 06/27/2021 09:36:36 3 139 0.0 8.30 0.0 0.0 06/27/2021 09:36:56 6 149 0.0 8.30 0.0 0.0 06/27/2021 09:37:16 -3 103 0.0 8.30 0.0 0.0 06/27/2021 09:37:36 -4 102 0.0 8.30 0.0 0.0 06/27/2021 09:37:56 -4 110 0.0 8.30 0.0 0.0 06/27/2021 09:38:16 7 144 0.0 8.30 0.0 0.0 06/27/2021 09:38:36 8 148 0.0 8.30 0.0 0.0 06/27/2021 09:38:56 -1 102 0.0 8.30 0.0 0.0 06/27/2021 09:39:16 -2 102 0.0 8.30 0.0 0.0 06/27/2021 09:39:36 -2 107 0.0 8.30 0.0 0.0 06/27/2021 09:39:56 6 145 0.0 8.30 0.0 0.0 06/27/2021 09:40:16 7 142 0.0 8.29 0.0 0.0 06/27/2021 09:40:36 -5 101 0.0 8.30 0.0 0.0 06/27/2021 09:40:56 -3 106 0.0 8.30 0.0 0.0 06/27/2021 09:41:16 -1 109 0.0 8.30 0.0 0.0 06/27/2021 09:41:36 9 145 0.0 8.30 0.0 0.0 06/27/2021 09:41:56 7 140 0.0 8.30 0.0 0.0 06/27/2021 09:42:16 -4 100 0.0 8.30 0.0 0.0 06/27/2021 09:42:36 -8 102 0.0 8.30 0.0 0.0 Page 8 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 09:43:16 7 147 0.0 8.30 0.0 0.0 06/27/2021 09:43:36 8 143 0.0 8.30 0.0 0.0 06/27/2021 09:43:56 -2 109 0.0 8.30 0.0 0.0 06/27/2021 09:44:16 -4 103 0.0 8.30 0.0 0.0 06/27/2021 09:44:36 -1 106 0.0 8.30 0.0 0.0 06/27/2021 09:44:56 7 139 0.0 8.30 0.0 0.0 06/27/2021 09:45:16 8 138 0.0 8.30 0.0 0.0 06/27/2021 09:45:36 -2 115 0.0 8.29 0.0 0.0 06/27/2021 09:45:56 -5 100 0.0 8.29 0.0 0.0 06/27/2021 09:46:16 -2 105 0.0 8.30 0.0 0.0 06/27/2021 09:46:36 4 132 0.0 8.30 0.0 0.0 06/27/2021 09:46:56 6 136 0.0 8.30 0.0 0.0 06/27/2021 09:47:16 7 157 0.0 8.29 0.0 0.0 06/27/2021 09:47:36 -6 101 0.0 8.30 0.0 0.0 06/27/2021 09:47:56 -4 104 0.0 8.29 0.0 0.0 06/27/2021 09:48:16 -3 109 0.0 8.30 0.0 0.0 06/27/2021 09:48:36 -3 110 0.0 8.29 0.0 0.0 06/27/2021 09:48:56 4 137 0.0 8.30 0.0 0.0 06/27/2021 09:49:16 3 141 0.0 8.29 0.0 0.0 06/27/2021 09:49:36 7 137 0.0 8.29 0.0 0.0 06/27/2021 09:49:56 8 153 0.0 8.30 0.0 0.0 06/27/2021 09:50:16 8 151 0.0 8.29 0.0 0.0 06/27/2021 09:50:36 4 126 0.0 8.29 0.0 0.0 06/27/2021 09:50:56 3 134 0.0 8.30 0.0 0.0 06/27/2021 09:51:16 8 152 0.0 8.29 0.0 0.0 06/27/2021 09:51:36 3 133 0.0 8.29 0.0 0.0 06/27/2021 09:51:56 6 137 0.0 8.29 0.0 0.0 06/27/2021 09:52:16 9 153 0.0 8.29 0.0 0.0 06/27/2021 09:52:36 3 125 0.0 8.29 0.0 0.0 06/27/2021 09:52:56 7 149 0.0 8.29 0.0 0.0 06/27/2021 09:53:16 5 132 0.0 8.29 0.0 0.0 06/27/2021 09:53:36 8 140 0.0 8.29 0.0 0.0 06/27/2021 09:53:56 1 126 0.0 8.29 0.0 0.0 06/27/2021 09:54:16 9 153 0.0 8.29 0.0 0.0 06/27/2021 09:54:36 7 146 0.0 8.29 0.0 0.0 06/27/2021 09:54:56 9 168 0.0 8.29 0.0 0.0 06/27/2021 09:55:16 2 131 0.0 8.29 0.0 0.0 06/27/2021 09:55:36 5 136 0.0 8.29 0.0 0.0 06/27/2021 09:55:56 9 157 0.0 8.29 0.0 0.0 06/27/2021 09:56:16 12 182 0.0 8.29 0.0 0.0 06/27/2021 09:56:36 -2 116 0.0 8.29 0.0 0.0 06/27/2021 09:56:56 4 130 0.0 8.29 0.0 0.0 06/27/2021 09:57:16 -2 115 0.0 8.29 0.0 0.0 06/27/2021 09:57:36 12 169 0.0 8.29 0.0 0.0 06/27/2021 09:57:56 1 127 0.0 8.29 0.0 0.0 06/27/2021 09:58:16 4 120 0.0 8.29 0.0 0.0 06/27/2021 09:58:36 3 135 0.0 8.29 0.0 0.0 06/27/2021 09:58:56 6 127 0.0 8.29 0.0 0.0 06/27/2021 09:59:16 -2 110 0.0 8.28 0.0 0.0 06/27/2021 09:59:36 -1 105 0.0 8.28 0.0 0.0 06/27/2021 09:59:56 7 141 0.0 8.28 0.0 0.0 06/27/2021 10:00:16 1 123 0.0 8.29 0.0 0.0 06/27/2021 10:00:36 3 119 0.0 8.29 0.0 0.0 06/27/2021 10:00:56 -1 120 0.0 8.29 0.0 0.0 Page 9 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 10:01:36 5 119 0.0 8.29 0.0 0.0 06/27/2021 10:01:56 2 130 0.0 8.28 0.0 0.0 06/27/2021 10:02:16 1 133 0.0 8.29 0.0 0.0 06/27/2021 10:02:36 3 158 0.0 8.29 0.0 0.0 06/27/2021 10:02:56 2 145 0.0 8.29 0.0 0.0 06/27/2021 10:03:16 -3 119 0.0 8.28 0.0 0.0 06/27/2021 10:03:36 3 133 0.0 8.28 0.0 0.0 06/27/2021 10:03:56 3 134 0.0 8.28 0.0 0.0 06/27/2021 10:04:16 -3 119 0.0 8.29 0.0 0.0 06/27/2021 10:04:56 -1 122 0.0 8.28 0.0 0.0 06/27/2021 10:05:16 5 143 0.0 8.28 0.0 0.0 06/27/2021 10:05:36 -1 117 0.0 8.29 0.0 0.0 06/27/2021 10:05:56 3 130 0.0 8.28 0.0 0.0 06/27/2021 10:06:16 2 119 0.0 8.28 0.0 0.0 06/27/2021 10:06:36 6 139 0.0 8.28 0.0 0.0 06/27/2021 10:06:56 6 149 0.0 8.28 0.0 0.0 06/27/2021 10:07:16 1 120 0.0 8.28 0.0 0.0 06/27/2021 10:07:36 0 114 0.0 8.28 0.0 0.0 06/27/2021 10:07:56 3 135 0.0 8.28 0.0 0.0 06/27/2021 10:08:16 5 134 0.0 8.28 0.0 0.0 06/27/2021 10:08:36 10 160 0.0 8.28 0.0 0.0 06/27/2021 10:08:56 -2 110 0.0 8.28 0.0 0.0 06/27/2021 10:09:16 3 125 0.0 8.28 0.0 0.0 06/27/2021 10:09:36 1 128 0.0 8.28 0.0 0.0 06/27/2021 10:09:56 0 127 0.0 8.27 0.0 0.0 06/27/2021 10:10:16 5 130 0.0 8.28 0.0 0.0 06/27/2021 10:10:36 4 119 0.0 8.28 0.0 0.0 06/27/2021 10:10:56 9 161 0.0 8.28 0.0 0.0 06/27/2021 10:11:16 7 147 0.0 8.28 0.0 0.0 06/27/2021 10:11:36 -0 122 0.0 8.28 0.0 0.0 06/27/2021 10:11:56 4 124 0.0 8.27 0.0 0.0 06/27/2021 10:12:16 11 161 0.0 8.28 0.0 0.0 06/27/2021 10:12:36 9 145 0.0 8.28 0.0 0.0 06/27/2021 10:12:56 3 139 0.0 8.28 0.0 0.0 06/27/2021 10:13:16 2 130 0.0 8.28 0.0 0.0 06/27/2021 10:13:36 -1 114 0.0 8.27 0.0 0.0 06/27/2021 10:13:56 4 134 0.0 8.28 0.0 0.0 06/27/2021 10:14:16 -1 112 0.0 8.27 0.0 0.0 06/27/2021 10:14:36 2 119 0.0 8.27 0.0 0.0 06/27/2021 10:14:56 3 141 0.0 8.28 0.0 0.0 06/27/2021 10:15:16 5 136 0.0 8.27 0.0 0.0 06/27/2021 10:15:36 4 132 0.0 8.28 0.0 0.0 06/27/2021 10:15:56 8 145 0.0 8.27 0.0 0.0 06/27/2021 10:16:16 -0 117 0.0 8.27 0.0 0.0 06/27/2021 10:16:36 -3 107 0.0 8.27 0.0 0.0 06/27/2021 10:16:56 1 135 0.0 8.27 0.0 0.0 06/27/2021 10:17:16 4 130 0.0 8.28 0.0 0.0 06/27/2021 10:17:36 9 144 0.0 8.28 0.0 0.0 06/27/2021 10:17:56 3 143 0.0 8.28 0.0 0.0 06/27/2021 10:18:16 6 141 0.0 8.27 0.0 0.0 06/27/2021 10:18:36 9 155 0.0 8.27 0.0 0.0 06/27/2021 10:18:56 11 145 0.0 8.27 0.0 0.0 06/27/2021 10:19:16 9 153 0.0 8.27 0.0 0.0 06/27/2021 10:19:36 3 133 0.0 8.27 0.0 0.0 Page 10 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 10:20:16 3 132 0.0 8.27 0.0 0.0 06/27/2021 10:20:36 6 150 0.0 8.27 0.0 0.0 06/27/2021 10:20:56 11 151 0.0 8.27 0.0 0.0 06/27/2021 10:21:16 6 143 0.0 8.27 0.0 0.0 06/27/2021 10:21:36 6 138 0.0 8.27 0.0 0.0 06/27/2021 10:21:56 -1 114 0.0 8.27 0.0 0.0 06/27/2021 10:22:16 2 129 0.0 8.27 0.0 0.0 06/27/2021 10:22:36 7 147 0.0 8.27 0.0 0.0 06/27/2021 10:22:56 4 127 0.0 8.27 0.0 0.0 06/27/2021 10:23:16 8 146 0.0 8.27 0.0 0.0 06/27/2021 10:23:36 3 136 0.0 8.27 0.0 0.0 06/27/2021 10:23:56 10 154 0.0 8.28 0.0 0.0 06/27/2021 10:24:16 5 136 0.0 8.27 0.0 0.0 06/27/2021 10:24:36 13 155 0.0 8.27 0.0 0.0 06/27/2021 10:24:56 3 130 0.0 8.27 0.0 0.0 06/27/2021 10:25:16 2 123 0.0 8.27 0.0 0.0 06/27/2021 10:25:36 8 147 0.0 8.27 0.0 0.0 06/27/2021 10:25:56 9 152 0.0 8.27 0.0 0.0 06/27/2021 10:26:16 10 149 0.0 8.27 0.0 0.0 06/27/2021 10:26:36 -1 116 0.0 8.27 0.0 0.0 06/27/2021 10:26:56 1 128 0.0 8.27 0.0 0.0 06/27/2021 10:27:16 7 144 0.0 8.27 0.0 0.0 06/27/2021 10:27:36 4 145 0.0 8.27 0.0 0.0 06/27/2021 10:27:56 11 140 0.0 8.27 0.0 0.0 06/27/2021 10:28:16 9 157 0.0 8.27 0.0 0.0 06/27/2021 10:28:36 5 139 0.0 8.27 0.0 0.0 06/27/2021 10:28:56 9 181 0.0 8.27 0.0 0.0 06/27/2021 10:29:16 2 124 0.0 8.27 0.0 0.0 06/27/2021 10:29:36 4 148 0.0 8.27 0.0 0.0 06/27/2021 10:29:56 8 143 0.0 8.26 0.0 0.0 06/27/2021 10:30:16 6 149 0.0 8.27 0.0 0.0 06/27/2021 10:30:36 7 139 0.0 8.27 0.0 0.0 06/27/2021 10:30:56 3 137 0.0 8.27 0.0 0.0 06/27/2021 10:31:16 2 119 0.0 8.27 0.0 0.0 06/27/2021 10:31:36 -9 84 0.0 8.27 0.0 0.0 06/27/2021 10:31:56 -3 114 0.0 8.27 0.0 0.0 06/27/2021 10:32:16 5 153 0.0 8.27 0.0 0.0 06/27/2021 10:32:36 5 130 0.0 8.27 0.0 0.0 06/27/2021 10:32:56 11 161 0.0 8.27 0.0 0.0 06/27/2021 10:33:16 2 129 0.0 8.27 0.0 0.0 06/27/2021 10:33:36 -2 115 0.0 8.27 0.0 0.0 06/27/2021 10:33:56 5 132 0.0 8.27 0.0 0.0 06/27/2021 10:34:16 9 143 0.0 8.26 0.0 0.0 06/27/2021 10:34:36 2 128 0.0 8.27 0.0 0.0 06/27/2021 10:34:56 -3 116 0.0 8.27 0.0 0.0 06/27/2021 10:35:16 2 123 0.0 8.27 0.0 0.0 06/27/2021 10:35:36 8 146 0.0 8.27 0.0 0.0 06/27/2021 10:35:56 -1 116 0.0 8.27 0.0 0.0 06/27/2021 10:36:16 5 136 0.0 8.27 0.0 0.0 06/27/2021 10:36:36 -0 123 0.0 8.26 0.0 0.0 06/27/2021 10:36:56 1 134 0.0 8.27 0.0 0.0 06/27/2021 10:37:16 3 136 0.0 8.27 0.0 0.0 06/27/2021 10:37:36 1 115 0.0 8.27 0.0 0.0 06/27/2021 10:37:56 -1 118 0.0 8.27 0.0 0.0 Page 11 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 10:38:36 -2 107 0.0 8.26 0.0 0.0 06/27/2021 10:38:56 -5 108 0.0 8.26 0.0 0.0 06/27/2021 10:39:16 8 147 0.0 8.26 0.0 0.0 06/27/2021 10:39:36 7 138 0.0 8.26 0.0 0.0 06/27/2021 10:39:56 -2 110 0.0 8.27 0.0 0.0 06/27/2021 10:40:16 -5 99 0.0 8.26 0.0 0.0 06/27/2021 10:40:36 1 118 0.0 8.27 0.0 0.0 06/27/2021 10:40:56 2 130 0.0 8.26 0.0 0.0 06/27/2021 10:41:16 3 127 0.0 8.27 0.0 0.0 06/27/2021 10:41:36 2 122 0.0 8.27 0.0 0.0 06/27/2021 10:41:56 -0 119 0.0 8.26 0.0 0.0 06/27/2021 10:42:16 0 126 0.0 8.26 0.0 0.0 06/27/2021 10:42:36 2 128 0.0 8.27 0.0 0.0 06/27/2021 10:42:56 1 122 0.0 8.27 0.0 0.0 06/27/2021 10:43:16 1 118 0.0 8.27 0.0 0.0 06/27/2021 10:43:36 1 121 0.0 8.26 0.0 0.0 06/27/2021 10:43:56 1 126 0.0 8.27 0.0 0.0 06/27/2021 10:44:16 -1 120 0.0 8.26 0.0 0.0 06/27/2021 10:44:36 -2 119 0.0 8.26 0.0 0.0 06/27/2021 10:44:56 -0 124 0.0 8.26 0.0 0.0 06/27/2021 10:45:16 2 128 0.0 8.26 0.0 0.0 06/27/2021 10:45:36 -3 111 0.0 8.25 0.0 0.0 06/27/2021 10:45:56 -1 112 0.0 8.26 0.0 0.0 06/27/2021 10:46:16 -1 115 0.0 8.27 0.0 0.0 06/27/2021 10:46:36 -4 112 0.0 8.26 0.0 0.0 06/27/2021 10:46:56 -2 117 0.0 8.26 0.0 0.0 06/27/2021 10:47:16 -4 112 0.0 8.26 0.0 0.0 06/27/2021 10:47:36 -3 116 0.0 8.26 0.0 0.0 06/27/2021 10:47:56 -2 114 0.0 8.26 0.0 0.0 06/27/2021 10:48:16 2 125 0.0 8.26 0.0 0.0 06/27/2021 10:48:36 -2 114 0.0 8.26 0.0 0.0 06/27/2021 10:48:56 -0 116 0.0 8.26 0.0 0.0 06/27/2021 10:49:16 -2 115 0.0 8.26 0.0 0.0 06/27/2021 10:49:36 1 118 0.0 8.26 0.0 0.0 06/27/2021 10:49:56 -0 114 0.0 8.26 0.0 0.0 06/27/2021 10:50:16 -0 111 0.0 8.26 0.0 0.0 06/27/2021 10:50:36 -1 117 0.0 8.26 0.0 0.0 06/27/2021 10:50:56 -2 116 0.0 8.26 0.0 0.0 06/27/2021 10:51:16 0 115 0.0 8.26 0.0 0.0 06/27/2021 10:51:36 -0 111 0.0 8.26 0.0 0.0 06/27/2021 10:51:56 1 116 0.0 8.26 0.0 0.0 06/27/2021 10:52:16 -1 121 0.0 8.26 0.0 0.0 06/27/2021 10:52:36 -1 119 0.0 8.26 0.0 0.0 06/27/2021 10:52:56 2 118 0.0 8.26 0.0 0.0 06/27/2021 10:53:16 -1 117 0.0 8.26 0.0 0.0 06/27/2021 10:53:36 0 119 0.0 8.26 0.0 0.0 06/27/2021 10:53:56 -1 120 0.0 8.26 0.0 0.0 06/27/2021 10:54:16 1 120 0.0 8.26 0.0 0.0 06/27/2021 10:54:36 1 122 0.0 8.26 0.0 0.0 06/27/2021 10:54:56 1 121 0.0 8.26 0.0 0.0 06/27/2021 10:55:16 1 124 0.0 8.26 0.0 0.0 06/27/2021 10:55:36 -1 116 0.0 8.26 0.0 0.0 06/27/2021 10:55:56 1 118 0.0 8.26 0.0 0.0 06/27/2021 10:56:16 3 139 0.0 8.26 0.0 0.0 Page 12 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 10:56:56 4 133 0.0 8.26 0.0 0.0 06/27/2021 10:57:16 3 138 0.0 8.26 0.0 0.0 06/27/2021 10:57:36 4 136 0.0 8.26 0.0 0.0 06/27/2021 10:57:56 3 136 0.0 8.26 0.0 0.0 06/27/2021 10:58:16 4 138 0.0 8.26 0.0 0.0 06/27/2021 10:58:36 2 132 0.0 8.26 0.0 0.0 06/27/2021 10:58:56 4 134 0.0 8.26 0.0 0.0 06/27/2021 10:59:16 5 137 0.0 8.26 0.0 0.0 06/27/2021 10:59:36 1 131 0.0 8.26 0.0 0.0 06/27/2021 10:59:56 3 139 0.0 8.26 0.0 0.0 06/27/2021 11:00:16 3 132 0.0 8.26 0.0 0.0 06/27/2021 11:00:36 5 137 0.0 8.26 0.0 0.0 06/27/2021 11:00:56 1 128 0.0 8.26 0.0 0.0 06/27/2021 11:01:16 4 138 0.0 8.26 0.0 0.0 06/27/2021 11:01:36 4 138 0.0 8.25 0.0 0.0 06/27/2021 11:01:56 3 142 0.0 8.25 0.0 0.0 06/27/2021 11:02:16 3 139 0.0 8.26 0.0 0.0 06/27/2021 11:02:36 3 134 0.0 8.26 0.0 0.0 06/27/2021 11:02:56 5 144 0.0 8.26 0.0 0.0 06/27/2021 11:03:16 6 141 0.0 8.26 0.0 0.0 06/27/2021 11:03:36 3 131 0.0 8.25 0.0 0.0 06/27/2021 11:03:56 8 158 0.0 8.26 0.0 0.0 06/27/2021 11:04:16 3 134 0.0 8.26 0.0 0.0 06/27/2021 11:04:36 22 196 0.0 8.26 0.0 0.0 06/27/2021 11:04:56 6 143 0.0 8.26 0.0 0.0 06/27/2021 11:05:16 7 145 0.0 8.26 0.0 0.0 06/27/2021 11:05:36 9 136 0.0 8.26 0.0 0.0 06/27/2021 11:05:56 -0 120 0.0 8.26 0.0 0.0 06/27/2021 11:06:16 3 143 0.0 8.26 0.0 0.0 06/27/2021 11:06:36 -0 120 0.0 8.25 0.0 0.0 06/27/2021 11:06:56 2 121 0.0 8.26 0.0 0.0 06/27/2021 11:07:16 -12 74 0.0 8.26 0.0 0.0 06/27/2021 11:07:36 4 129 0.0 8.25 0.0 0.0 06/27/2021 11:07:56 1 128 0.0 8.26 0.0 0.0 06/27/2021 11:08:16 8 156 0.0 8.25 0.0 0.0 06/27/2021 11:08:36 5 143 0.0 8.26 0.0 0.0 06/27/2021 11:08:56 5 145 0.0 8.26 0.0 0.0 06/27/2021 11:09:16 7 159 0.0 8.26 0.0 0.0 06/27/2021 11:09:36 2 134 0.0 8.26 0.0 0.0 06/27/2021 11:09:56 5 132 0.0 8.25 0.0 0.0 06/27/2021 11:10:16 3 139 0.0 8.25 0.0 0.0 06/27/2021 11:10:36 5 139 0.0 8.25 0.0 0.0 06/27/2021 11:10:56 5 145 0.0 8.25 0.0 0.0 06/27/2021 11:11:16 1 128 0.0 8.26 0.0 0.0 06/27/2021 11:11:36 3 140 0.0 8.25 0.0 0.0 06/27/2021 11:11:56 5 134 0.0 8.25 0.0 0.0 06/27/2021 11:12:16 2 128 0.0 8.25 0.0 0.0 06/27/2021 11:12:36 4 136 0.0 8.26 0.0 0.0 06/27/2021 11:12:56 2 139 0.0 8.26 0.0 0.0 06/27/2021 11:13:16 2 139 0.0 8.26 0.0 0.0 06/27/2021 11:13:36 3 137 0.0 8.26 0.0 0.0 06/27/2021 11:13:56 5 135 0.0 8.25 0.0 0.0 06/27/2021 11:14:16 5 139 0.0 8.25 0.0 0.0 06/27/2021 11:14:36 3 132 0.0 8.25 0.0 0.0 Page 13 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 11:15:16 3 133 0.0 8.25 0.0 0.0 06/27/2021 11:15:36 5 137 0.0 8.26 0.0 0.0 06/27/2021 11:15:56 6 142 0.0 8.26 0.0 0.0 06/27/2021 11:16:16 -0 127 0.0 8.25 0.0 0.0 06/27/2021 11:16:36 4 136 0.0 8.25 0.0 0.0 06/27/2021 11:16:56 3 143 0.0 8.26 0.0 0.0 06/27/2021 11:17:16 3 130 0.0 8.26 0.0 0.0 06/27/2021 11:17:36 1 127 0.0 8.26 0.0 0.0 06/27/2021 11:17:56 3 134 0.0 8.26 0.0 0.0 06/27/2021 11:18:16 5 147 0.0 8.26 0.0 0.0 06/27/2021 11:18:36 2 132 0.0 8.25 0.0 0.0 06/27/2021 11:18:56 4 134 0.0 8.25 0.0 0.0 06/27/2021 11:19:16 5 133 0.0 8.25 0.0 0.0 06/27/2021 11:19:36 3 141 0.0 8.25 0.0 0.0 06/27/2021 11:19:56 1 129 0.0 8.25 0.0 0.0 06/27/2021 11:20:16 1 136 0.0 8.25 0.0 0.0 06/27/2021 11:20:36 1 137 0.0 8.25 0.0 0.0 06/27/2021 11:20:56 4 143 0.0 8.25 0.0 0.0 06/27/2021 11:21:16 1 136 0.0 8.25 0.0 0.0 06/27/2021 11:21:36 2 134 0.0 8.26 0.0 0.0 06/27/2021 11:21:56 -1 136 0.0 8.25 0.0 0.0 06/27/2021 11:22:16 3 141 0.0 8.25 0.0 0.0 06/27/2021 11:22:36 -1 141 0.0 8.25 0.0 0.0 06/27/2021 11:22:56 0 132 0.0 8.25 0.0 0.0 06/27/2021 11:23:16 2 134 0.0 8.26 0.0 0.0 06/27/2021 11:23:36 2 139 0.0 8.26 0.0 0.0 06/27/2021 11:23:56 1 130 0.0 8.25 0.0 0.0 06/27/2021 11:24:16 3 131 0.0 8.26 0.0 0.0 06/27/2021 11:24:36 4 130 0.0 8.26 0.0 0.0 06/27/2021 11:24:56 3 137 0.0 8.25 0.0 0.0 06/27/2021 11:25:16 1 129 0.0 8.25 0.0 0.0 06/27/2021 11:25:36 1 133 0.0 8.25 0.0 0.0 06/27/2021 11:25:56 1 141 0.0 8.26 0.0 0.0 06/27/2021 11:26:16 3 133 0.0 8.26 0.0 0.0 06/27/2021 11:26:36 -1 130 0.0 8.25 0.0 0.0 06/27/2021 11:26:56 4 135 0.0 8.25 0.0 0.0 06/27/2021 11:27:16 3 128 0.0 8.25 0.0 0.0 06/27/2021 11:27:36 1 134 0.0 8.25 0.0 0.0 06/27/2021 11:27:56 1 131 0.0 8.25 0.0 0.0 06/27/2021 11:28:16 1 136 0.0 8.25 0.0 0.0 06/27/2021 11:28:36 1 138 0.0 8.25 0.0 0.0 06/27/2021 11:28:56 1 134 0.0 8.26 0.0 0.0 06/27/2021 11:29:16 1 129 0.0 8.25 0.0 0.0 06/27/2021 11:29:36 1 137 0.0 8.25 0.0 0.0 06/27/2021 11:29:56 1 122 0.0 8.26 0.0 0.0 06/27/2021 11:30:16 5 132 0.0 8.25 0.0 0.0 06/27/2021 11:30:36 -1 132 0.0 8.25 0.0 0.0 06/27/2021 11:30:56 2 134 0.0 8.25 0.0 0.0 06/27/2021 11:31:16 4 149 0.0 8.25 0.0 0.0 06/27/2021 11:31:36 -1 133 0.0 8.26 0.0 0.0 06/27/2021 11:31:56 4 136 0.0 8.26 0.0 0.0 06/27/2021 11:32:16 4 143 0.0 8.26 0.0 0.0 06/27/2021 11:32:36 6 144 0.0 8.26 0.0 0.0 06/27/2021 11:32:56 4 135 0.0 8.26 0.0 0.0 Page 14 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 11:33:36 2 135 0.0 8.25 0.0 0.0 06/27/2021 11:33:56 2 150 0.0 8.25 0.0 0.0 06/27/2021 11:34:16 2 140 0.0 8.26 0.0 0.0 06/27/2021 11:34:36 3 137 0.0 8.26 0.0 0.0 06/27/2021 11:34:56 3 144 0.0 8.25 0.0 0.0 06/27/2021 11:35:16 6 144 0.0 8.26 0.0 0.0 06/27/2021 11:35:36 0 135 0.0 8.25 0.0 0.0 06/27/2021 11:35:56 4 136 0.0 8.25 0.0 0.0 06/27/2021 11:36:16 1 142 0.0 8.25 0.0 0.0 06/27/2021 11:36:36 4 139 0.0 8.26 0.0 0.0 06/27/2021 11:36:56 2 140 0.0 8.26 0.0 0.0 06/27/2021 11:37:16 1 133 0.0 8.25 0.0 0.0 06/27/2021 11:37:36 5 136 0.0 8.25 0.0 0.0 06/27/2021 11:37:56 4 145 0.0 8.25 0.0 0.0 06/27/2021 11:38:16 1 130 0.0 8.25 0.0 0.0 06/27/2021 11:38:36 2 133 0.0 8.25 0.0 0.0 06/27/2021 11:38:56 2 135 0.0 8.25 0.0 0.0 06/27/2021 11:39:16 3 144 0.0 8.26 0.0 0.0 06/27/2021 11:39:36 2 136 0.0 8.25 0.0 0.0 06/27/2021 11:39:56 2 135 0.0 8.25 0.0 0.0 06/27/2021 11:40:16 3 145 0.0 8.25 0.0 0.0 06/27/2021 11:40:36 3 136 0.0 8.26 0.0 0.0 06/27/2021 11:40:56 1 136 0.0 8.25 0.0 0.0 06/27/2021 11:41:16 -1 123 0.0 8.25 0.0 0.0 06/27/2021 11:41:36 -0 120 0.0 8.25 0.0 0.0 06/27/2021 11:41:56 2 133 0.0 8.25 0.0 0.0 06/27/2021 11:42:16 -0 119 0.0 8.26 0.0 0.0 06/27/2021 11:42:36 3 134 0.0 8.25 0.0 0.0 06/27/2021 11:42:56 -1 129 0.0 8.26 0.0 0.0 06/27/2021 11:43:16 -1 131 0.0 8.25 0.0 0.0 06/27/2021 11:43:36 1 125 0.0 8.25 0.0 0.0 06/27/2021 11:43:56 3 129 0.0 8.26 0.0 0.0 06/27/2021 11:44:16 -2 119 0.0 8.25 0.0 0.0 06/27/2021 11:44:36 4 130 0.0 8.26 0.0 0.0 06/27/2021 11:44:56 3 122 0.0 8.25 0.0 0.0 06/27/2021 11:45:16 3 128 0.0 8.25 0.0 0.0 06/27/2021 11:45:36 1 138 0.0 8.25 0.0 0.0 06/27/2021 11:45:56 1 133 0.0 8.25 0.0 0.0 06/27/2021 11:46:16 2 130 0.0 8.26 0.0 0.0 06/27/2021 11:46:36 3 134 0.0 8.25 0.0 0.0 06/27/2021 11:46:56 2 143 0.0 8.25 0.0 0.0 06/27/2021 11:47:16 4 134 0.0 8.25 0.0 0.0 06/27/2021 11:47:36 6 141 0.0 8.26 0.0 0.0 06/27/2021 11:47:56 4 137 0.0 8.25 0.0 0.0 06/27/2021 11:48:16 3 144 0.0 8.26 0.0 0.0 06/27/2021 11:48:36 1 126 0.0 8.25 0.0 0.0 06/27/2021 11:48:56 2 137 0.0 8.25 0.0 0.0 06/27/2021 11:49:16 3 141 0.0 8.25 0.0 0.0 06/27/2021 11:49:36 5 147 0.0 8.25 0.0 0.0 06/27/2021 11:49:56 5 134 0.0 8.26 0.0 0.0 06/27/2021 11:50:16 2 139 0.0 8.25 0.0 0.0 06/27/2021 11:50:36 6 141 0.0 8.25 0.0 0.0 06/27/2021 11:50:56 4 141 0.0 8.25 0.0 0.0 06/27/2021 11:51:16 5 139 0.0 8.25 0.0 0.0 Page 15 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 11:51:56 3 137 0.0 8.25 0.0 0.0 06/27/2021 11:52:16 9 181 0.0 8.25 0.0 0.0 06/27/2021 11:52:36 8 139 0.8 8.26 0.1 0.1 06/27/2021 11:52:56 6 133 0.9 8.25 0.4 0.4 06/27/2021 11:53:16 8 131 1.0 8.26 0.7 0.7 06/27/2021 11:53:36 10 154 1.0 8.25 1.0 1.0 06/27/2021 11:53:56 15 136 1.0 8.25 1.4 1.4 06/27/2021 11:54:16 13 121 1.0 8.25 1.7 1.7 06/27/2021 11:54:36 9 114 1.0 8.25 2.1 2.1 06/27/2021 11:54:56 10 119 1.1 8.25 2.4 2.4 06/27/2021 11:55:16 16 149 1.1 8.25 2.8 2.8 06/27/2021 11:55:36 18 143 1.1 8.25 3.2 3.2 06/27/2021 11:55:56 16 137 1.1 8.25 3.5 3.5 06/27/2021 11:56:16 14 137 1.1 8.26 3.9 3.9 06/27/2021 11:56:36 19 147 1.1 8.25 4.3 4.3 06/27/2021 11:56:56 21 149 1.1 8.25 4.6 4.6 06/27/2021 11:57:16 15 138 1.1 8.25 5.0 5.0 06/27/2021 11:57:36 19 133 1.1 8.25 5.4 5.4 06/27/2021 11:57:56 9 136 0.0 8.25 5.7 5.7 06/27/2021 11:58:16 8 147 0.0 8.25 5.7 5.7 06/27/2021 11:58:36 5 134 0.0 8.25 5.7 5.7 06/27/2021 11:58:56 2 135 0.0 8.26 5.7 5.7 06/27/2021 11:59:16 4 136 0.0 8.25 5.7 5.7 06/27/2021 11:59:36 8 146 0.0 8.25 5.7 5.7 06/27/2021 11:59:56 5 133 0.0 8.25 5.7 5.7 06/27/2021 12:00:16 3 134 0.0 8.25 5.7 5.7 06/27/2021 12:00:36 1 142 0.0 8.25 5.7 5.7 06/27/2021 12:00:56 5 141 0.0 8.25 5.7 5.7 06/27/2021 12:01:16 2 138 0.0 8.25 5.7 5.7 06/27/2021 12:01:36 0 140 0.0 8.25 5.7 5.7 06/27/2021 12:01:56 4 140 0.0 8.25 5.7 5.7 06/27/2021 12:02:16 4 140 0.0 8.25 5.7 5.7 06/27/2021 12:02:36 11 159 0.0 8.25 5.7 5.7 06/27/2021 12:02:56 3 134 0.0 8.25 5.7 5.7 06/27/2021 12:03:16 5 137 0.0 8.25 5.7 5.7 06/27/2021 12:03:36 0 133 0.0 8.25 5.7 5.7 06/27/2021 12:03:56 1 123 0.0 8.25 5.7 5.7 06/27/2021 12:04:16 -1 128 0.0 8.25 5.7 5.7 06/27/2021 12:04:36 3 129 0.0 8.25 5.7 5.7 06/27/2021 12:04:56 3 133 0.0 8.25 5.7 5.7 06/27/2021 12:05:16 1 128 0.0 8.25 5.7 5.7 06/27/2021 12:05:36 -1 136 0.0 8.25 5.7 5.7 06/27/2021 12:05:56 1 133 0.0 8.25 5.7 5.7 06/27/2021 12:06:16 2 131 0.0 8.25 5.7 5.7 06/27/2021 12:06:36 0 124 0.0 8.25 5.7 5.7 06/27/2021 12:06:56 -0 126 0.0 8.25 5.7 5.7 06/27/2021 12:07:16 -0 122 0.0 8.25 5.7 5.7 06/27/2021 12:07:36 2 135 0.0 8.25 5.7 5.7 06/27/2021 12:07:56 -2 126 0.0 8.25 5.7 5.7 06/27/2021 12:08:16 2 127 0.0 8.25 5.7 5.7 06/27/2021 12:08:36 2 132 0.0 8.25 5.7 5.7 06/27/2021 12:08:56 1 128 0.0 8.25 5.7 5.7 06/27/2021 12:09:16 -2 125 0.0 8.25 5.7 5.7 06/27/2021 12:09:36 -1 129 0.0 8.25 5.7 5.7 Page 16 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 12:10:16 -2 116 0.0 8.25 5.7 5.7 06/27/2021 12:10:36 -3 112 0.0 8.25 5.7 5.7 06/27/2021 12:10:56 -1 114 0.0 8.25 5.7 5.7 06/27/2021 12:11:16 2 117 0.0 8.25 5.7 5.7 06/27/2021 12:11:36 2 125 0.0 8.24 5.7 5.7 06/27/2021 12:11:56 -4 126 0.0 8.25 5.7 5.7 06/27/2021 12:12:16 -2 116 0.0 8.25 5.7 5.7 06/27/2021 12:12:36 -3 107 0.0 8.24 5.7 5.7 06/27/2021 12:12:56 1 119 0.0 8.25 5.7 5.7 06/27/2021 12:13:16 -3 115 0.0 8.25 5.7 5.7 06/27/2021 12:13:36 -1 115 0.0 8.25 5.7 5.7 06/27/2021 12:13:56 1 118 0.0 8.25 5.7 5.7 06/27/2021 12:14:16 -2 116 0.0 8.25 5.7 5.7 06/27/2021 12:14:36 -1 114 0.0 8.25 5.7 5.7 06/27/2021 12:14:56 2 114 0.0 8.25 5.7 5.7 06/27/2021 12:15:16 -5 106 0.0 8.24 5.7 5.7 06/27/2021 12:15:36 -1 116 0.0 8.25 5.7 5.7 06/27/2021 12:15:56 -4 114 0.0 8.25 5.7 5.7 06/27/2021 12:16:16 -2 112 0.0 8.25 5.7 5.7 06/27/2021 12:16:36 2 132 0.0 8.25 5.7 5.7 06/27/2021 12:16:56 -0 120 0.0 8.25 5.7 5.7 06/27/2021 12:17:16 -1 112 0.0 8.25 5.7 5.7 06/27/2021 12:17:36 -3 114 0.0 8.25 5.7 5.7 06/27/2021 12:17:56 0 120 0.0 8.25 5.7 5.7 06/27/2021 12:18:16 -2 118 0.0 8.25 5.7 5.7 06/27/2021 12:18:36 -1 114 0.0 8.25 5.7 5.7 06/27/2021 12:18:56 0 113 0.0 8.25 5.7 5.7 06/27/2021 12:19:16 2 141 0.0 8.25 5.7 5.7 06/27/2021 12:19:36 1 119 0.0 8.24 5.7 5.7 06/27/2021 12:19:56 5 137 0.0 8.25 5.7 5.7 06/27/2021 12:20:16 -2 119 0.0 8.24 5.7 5.7 06/27/2021 12:20:36 -1 117 0.0 8.25 5.7 5.7 06/27/2021 12:20:56 -1 121 0.0 8.25 5.7 5.7 06/27/2021 12:21:16 -0 120 0.0 8.25 5.7 5.7 06/27/2021 12:21:36 -0 119 0.0 8.25 5.7 5.7 06/27/2021 12:21:56 1 116 0.0 8.25 5.7 5.7 06/27/2021 12:22:16 -1 122 0.0 8.25 5.7 5.7 06/27/2021 12:22:36 2 119 0.0 8.25 5.7 5.7 06/27/2021 12:22:56 -1 116 0.0 8.25 5.7 5.7 06/27/2021 12:23:16 1 120 0.0 8.25 5.7 5.7 06/27/2021 12:23:36 -1 120 0.0 8.25 5.7 5.7 06/27/2021 12:23:56 -2 122 0.0 8.25 5.7 5.7 06/27/2021 12:24:16 -0 116 0.0 8.25 5.7 5.7 06/27/2021 12:24:36 3 120 0.0 8.25 5.7 5.7 06/27/2021 12:24:56 1 135 0.0 8.25 5.7 5.7 06/27/2021 12:25:16 3 122 0.0 8.24 5.7 5.7 06/27/2021 12:25:36 1 113 0.0 8.24 5.7 5.7 06/27/2021 12:25:56 -1 120 0.0 8.24 5.7 5.7 06/27/2021 12:26:16 3 132 0.0 8.25 5.7 5.7 06/27/2021 12:26:36 1 124 0.0 8.25 5.7 5.7 06/27/2021 12:26:56 -1 115 0.0 8.24 5.7 5.7 06/27/2021 12:27:16 -1 118 0.0 8.24 5.7 5.7 06/27/2021 12:27:36 2 122 0.0 8.25 5.7 5.7 06/27/2021 12:27:56 -1 122 0.0 8.25 5.7 5.7 Page 17 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 12:28:36 -2 114 0.0 8.24 5.7 5.7 06/27/2021 12:28:56 -1 121 0.0 8.25 5.7 5.7 06/27/2021 12:29:16 2 125 0.0 8.25 5.7 5.7 06/27/2021 12:29:36 -1 111 0.0 8.24 5.7 5.7 06/27/2021 12:29:56 -1 113 0.0 8.25 5.7 5.7 06/27/2021 12:30:16 2 120 0.0 8.25 5.7 5.7 06/27/2021 12:30:36 2 128 0.0 8.25 5.7 5.7 06/27/2021 12:30:56 -0 120 0.0 8.24 5.7 5.7 06/27/2021 12:31:16 -1 116 0.0 8.24 5.7 5.7 06/27/2021 12:31:36 1 116 0.0 8.25 5.7 5.7 06/27/2021 12:31:56 4 134 0.0 8.24 5.7 5.7 06/27/2021 12:32:16 -1 120 0.0 8.25 5.7 5.7 06/27/2021 12:32:36 -2 118 0.0 8.24 5.7 5.7 06/27/2021 12:32:56 -2 117 0.0 8.25 5.7 5.7 06/27/2021 12:33:16 4 137 0.0 8.25 5.7 5.7 06/27/2021 12:33:36 0 124 0.0 8.24 5.7 5.7 06/27/2021 12:33:56 -1 114 0.0 8.24 5.7 5.7 06/27/2021 12:34:16 2 127 0.0 8.25 5.7 5.7 06/27/2021 12:34:36 1 119 0.0 8.25 5.7 5.7 06/27/2021 12:34:56 1 121 0.0 8.24 5.7 5.7 06/27/2021 12:35:16 -2 117 0.0 8.25 5.7 5.7 06/27/2021 12:35:36 -2 115 0.0 8.24 5.7 5.7 06/27/2021 12:35:56 -3 116 0.0 8.24 5.7 5.7 06/27/2021 12:36:16 1 126 0.0 8.25 5.7 5.7 06/27/2021 12:36:36 -0 124 0.0 8.24 5.7 5.7 06/27/2021 12:36:56 -1 120 0.0 8.24 5.7 5.7 06/27/2021 12:37:16 1 118 0.0 8.24 5.7 5.7 06/27/2021 12:37:36 -1 124 0.0 8.25 5.7 5.7 06/27/2021 12:37:56 -3 114 0.0 8.24 5.7 5.7 06/27/2021 12:38:16 -5 115 0.0 8.25 5.7 5.7 06/27/2021 12:38:36 -2 119 0.0 8.24 5.7 5.7 06/27/2021 12:38:56 3 135 0.0 8.24 5.7 5.7 06/27/2021 12:39:16 -1 123 0.0 8.25 5.7 5.7 06/27/2021 12:39:36 -1 111 0.0 8.24 5.7 5.7 06/27/2021 12:39:56 -1 115 0.0 8.24 5.7 5.7 06/27/2021 12:40:16 4 138 0.0 8.25 5.7 5.7 06/27/2021 12:40:36 2 123 0.0 8.25 5.7 5.7 06/27/2021 12:40:56 5 124 0.0 8.25 5.7 5.7 06/27/2021 12:41:16 -3 112 0.0 8.24 5.7 5.7 06/27/2021 12:41:36 -1 113 0.0 8.24 5.7 5.7 06/27/2021 12:41:56 -1 123 0.0 8.24 5.7 5.7 06/27/2021 12:42:16 -4 118 0.0 8.24 5.7 5.7 06/27/2021 12:42:36 -5 102 0.0 8.24 5.7 5.7 06/27/2021 12:42:56 -6 107 0.0 8.25 5.7 5.7 06/27/2021 12:43:16 -1 137 0.0 8.25 5.7 5.7 06/27/2021 12:43:36 -5 107 0.0 8.24 5.7 5.7 06/27/2021 12:43:56 -3 108 0.0 8.25 5.7 5.7 06/27/2021 12:44:16 -1 120 0.0 8.24 5.7 5.7 06/27/2021 12:44:36 0 118 0.0 8.24 5.7 5.7 06/27/2021 12:44:56 3 150 0.0 8.24 5.7 5.7 06/27/2021 12:45:16 -3 120 0.0 8.25 5.7 5.7 06/27/2021 12:45:36 -5 113 0.0 8.25 5.7 5.7 06/27/2021 12:45:56 1 116 0.0 8.24 5.7 5.7 06/27/2021 12:46:16 3 130 0.0 8.25 5.7 5.7 Page 18 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 12:46:56 -1 117 0.0 8.24 5.7 5.7 06/27/2021 12:47:16 -4 107 0.0 8.24 5.7 5.7 06/27/2021 12:47:36 -6 105 0.0 8.24 5.7 5.7 06/27/2021 12:47:56 -2 122 0.0 8.24 5.7 5.7 06/27/2021 12:48:16 -7 90 0.0 8.24 5.7 5.7 06/27/2021 12:48:36 -9 93 0.0 8.25 5.7 5.7 06/27/2021 12:48:56 -7 97 0.0 8.24 5.7 5.7 06/27/2021 12:49:16 -6 106 0.0 8.25 5.7 5.7 06/27/2021 12:49:36 -7 110 0.0 8.24 5.7 5.7 06/27/2021 12:49:56 -6 108 0.0 8.24 5.7 5.7 06/27/2021 12:50:16 -5 102 0.0 8.24 5.7 5.7 06/27/2021 12:50:36 -3 107 0.0 8.24 5.7 5.7 06/27/2021 12:50:56 -5 107 0.0 8.24 5.7 5.7 06/27/2021 12:51:16 -4 106 0.0 8.24 5.7 5.7 06/27/2021 12:51:36 -1 116 0.0 8.24 5.7 5.7 06/27/2021 12:51:56 -0 122 0.0 8.24 5.7 5.7 06/27/2021 12:52:16 -0 113 0.0 8.25 5.7 5.7 06/27/2021 12:52:36 0 118 0.0 8.24 5.7 5.7 06/27/2021 12:53:16 -2 115 0.0 8.25 5.7 5.7 06/27/2021 12:53:36 -1 117 0.0 8.24 5.7 5.7 06/27/2021 12:53:56 -2 122 0.0 8.24 5.7 5.7 06/27/2021 12:54:16 -4 117 0.0 8.24 5.7 5.7 06/27/2021 12:54:36 -2 112 0.0 8.25 5.7 5.7 06/27/2021 12:54:56 -3 118 0.0 8.25 5.7 5.7 06/27/2021 12:55:16 -3 113 0.0 8.24 5.7 5.7 06/27/2021 12:55:36 -3 112 0.0 8.25 5.7 5.7 06/27/2021 12:55:56 -6 103 0.0 8.24 5.7 5.7 06/27/2021 12:56:16 -9 102 0.0 8.24 5.7 5.7 06/27/2021 12:56:56 -6 110 0.0 8.24 5.7 5.7 06/27/2021 12:57:16 -6 108 0.0 8.24 5.7 5.7 06/27/2021 12:57:36 -4 117 0.0 8.25 5.7 5.7 06/27/2021 12:57:56 -3 108 0.0 8.24 5.7 5.7 06/27/2021 12:58:16 -5 114 0.0 8.24 5.7 5.7 06/27/2021 12:58:36 -3 114 0.0 8.24 5.7 5.7 06/27/2021 12:58:56 -4 106 0.0 8.24 5.7 5.7 06/27/2021 12:59:16 -1 114 0.0 8.24 5.7 5.7 06/27/2021 12:59:36 -4 111 0.0 8.24 5.7 5.7 06/27/2021 12:59:56 -4 110 0.0 8.24 5.7 5.7 06/27/2021 13:00:16 3 136 0.0 8.25 5.7 5.7 06/27/2021 13:00:36 -6 92 0.0 8.25 5.7 5.7 06/27/2021 13:00:56 -3 113 0.0 8.24 5.7 5.7 06/27/2021 13:01:16 -3 104 0.0 8.24 5.7 5.7 06/27/2021 13:01:36 -0 129 0.0 8.25 5.7 5.7 06/27/2021 13:01:56 -1 112 0.0 8.25 5.7 5.7 06/27/2021 13:02:16 -4 103 0.0 8.24 5.7 5.7 06/27/2021 13:02:36 -7 105 0.0 8.25 5.7 5.7 06/27/2021 13:02:56 -9 99 0.0 8.24 5.7 5.7 06/27/2021 13:03:16 -6 102 0.0 8.24 5.7 5.7 06/27/2021 13:03:36 -1 118 0.0 8.24 5.7 5.7 06/27/2021 13:03:56 3 145 0.0 8.24 5.7 5.7 06/27/2021 13:04:16 5 150 0.0 8.24 5.7 5.7 06/27/2021 13:04:36 -1 115 0.0 8.25 5.7 5.7 06/27/2021 13:04:56 -0 119 0.0 8.24 5.7 5.7 06/27/2021 13:05:16 -0 128 0.0 8.24 5.7 5.7 Page 19 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 13:05:56 2 125 0.0 8.24 5.7 5.7 06/27/2021 13:06:16 -1 109 0.0 8.25 5.7 5.7 06/27/2021 13:06:36 -1 114 0.0 8.24 5.7 5.7 06/27/2021 13:06:56 -8 103 0.0 8.24 5.7 5.7 06/27/2021 13:07:16 1 118 0.0 8.24 5.7 5.7 06/27/2021 13:07:36 0 120 0.0 8.24 5.7 5.7 06/27/2021 13:07:56 4 133 0.0 8.24 5.7 5.7 06/27/2021 13:08:16 -4 115 0.0 8.24 5.7 5.7 06/27/2021 13:08:36 -8 104 0.0 8.24 5.7 5.7 06/27/2021 13:08:56 -5 102 0.0 8.24 5.7 5.7 06/27/2021 13:09:16 1 114 0.0 8.25 5.7 5.7 06/27/2021 13:09:36 4 130 0.0 8.24 5.7 5.7 06/27/2021 13:09:56 -5 103 0.0 8.24 5.7 5.7 06/27/2021 13:10:16 3 133 0.0 8.24 5.7 5.7 06/27/2021 13:10:36 -3 120 0.0 8.24 5.7 5.7 06/27/2021 13:10:56 1 123 0.0 8.24 5.7 5.7 06/27/2021 13:11:16 -0 110 0.0 8.24 5.7 5.7 06/27/2021 13:11:36 0 115 0.0 8.24 5.7 5.7 06/27/2021 13:11:56 -1 112 0.0 8.24 5.7 5.7 06/27/2021 13:12:16 1 115 0.0 8.25 5.7 5.7 06/27/2021 13:12:36 -9 96 0.0 8.24 5.7 5.7 06/27/2021 13:12:56 -3 106 0.0 8.24 5.7 5.7 06/27/2021 13:13:16 -5 108 0.0 8.24 5.7 5.7 06/27/2021 13:13:36 -2 121 0.0 8.24 5.7 5.7 06/27/2021 13:13:56 -4 100 0.0 8.24 5.7 5.7 06/27/2021 13:14:16 -8 96 0.0 8.25 5.7 5.7 06/27/2021 13:14:36 -5 114 0.0 8.24 5.7 5.7 06/27/2021 13:14:56 -1 124 0.0 8.24 5.7 5.7 06/27/2021 13:15:16 -5 108 0.0 8.24 5.7 5.7 06/27/2021 13:15:36 -6 101 0.0 8.25 5.7 5.7 06/27/2021 13:15:56 -9 96 0.0 8.24 5.7 5.7 06/27/2021 13:16:16 -4 104 0.0 8.24 5.7 5.7 06/27/2021 13:16:36 -6 95 0.0 8.25 5.7 5.7 06/27/2021 13:16:56 -4 118 0.0 8.24 5.7 5.7 06/27/2021 13:17:16 -5 106 0.0 8.24 5.7 5.7 06/27/2021 13:17:36 -9 97 0.0 8.24 5.7 5.7 06/27/2021 13:17:56 -2 108 0.0 8.24 5.7 5.7 06/27/2021 13:18:16 -7 100 0.0 8.24 5.7 5.7 06/27/2021 13:18:36 -1 113 0.0 8.24 5.7 5.7 06/27/2021 13:18:56 -1 121 0.0 8.24 5.7 5.7 06/27/2021 13:19:16 -2 104 0.0 8.24 5.7 5.7 06/27/2021 13:19:36 3 134 0.0 8.25 5.7 5.7 06/27/2021 13:19:56 -5 112 0.0 8.25 5.7 5.7 06/27/2021 13:20:16 -0 120 0.0 8.25 5.7 5.7 06/27/2021 13:20:36 4 132 0.0 8.25 5.7 5.7 06/27/2021 13:20:56 -2 114 0.0 8.24 5.7 5.7 06/27/2021 13:21:16 -10 105 0.0 8.24 5.7 5.7 06/27/2021 13:21:36 -9 106 0.0 8.24 5.7 5.7 06/27/2021 13:21:56 -10 112 0.0 8.24 5.7 5.7 06/27/2021 13:22:16 -7 124 0.0 8.24 5.7 5.7 06/27/2021 13:22:36 -4 126 0.0 8.24 5.7 5.7 06/27/2021 13:22:56 -5 132 0.0 8.24 5.7 5.7 06/27/2021 13:23:16 -5 123 0.0 8.24 5.7 5.7 06/27/2021 13:23:36 -6 116 0.0 8.24 5.7 5.7 Page 20 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 13:24:16 -13 106 0.0 8.24 5.7 5.7 06/27/2021 13:24:36 -8 110 0.0 8.24 5.7 5.7 06/27/2021 13:24:56 -7 116 0.0 8.24 5.7 5.7 06/27/2021 13:25:16 -5 122 0.0 8.24 5.7 5.7 06/27/2021 13:25:36 -6 108 0.0 8.24 5.7 5.7 06/27/2021 13:25:56 -4 132 0.0 8.24 5.7 5.7 06/27/2021 13:26:16 -12 113 0.0 8.24 5.7 5.7 06/27/2021 13:26:36 -8 119 0.0 8.24 5.7 5.7 06/27/2021 13:26:56 -9 115 0.0 8.24 5.7 5.7 06/27/2021 13:27:16 -7 121 0.0 8.24 5.7 5.7 06/27/2021 13:27:36 -7 109 0.0 8.24 5.7 5.7 06/27/2021 13:27:56 -7 101 0.0 8.24 5.7 5.7 06/27/2021 13:28:16 -9 106 0.0 8.24 5.7 5.7 06/27/2021 13:28:36 -5 109 0.0 8.24 5.7 5.7 06/27/2021 13:28:56 -6 133 0.0 8.24 5.7 5.7 06/27/2021 13:29:16 -8 135 0.0 8.24 5.7 5.7 06/27/2021 13:29:36 -9 110 0.0 8.24 5.7 5.7 06/27/2021 13:29:56 -7 122 0.0 8.24 5.7 5.7 06/27/2021 13:30:16 -6 129 0.0 8.24 5.7 5.7 06/27/2021 13:30:36 -6 116 0.0 8.24 5.7 5.7 06/27/2021 13:30:56 -6 126 0.0 8.24 5.7 5.7 06/27/2021 13:31:16 -6 106 0.0 8.24 5.7 5.7 06/27/2021 13:31:36 -8 107 0.0 8.24 5.7 5.7 06/27/2021 13:31:56 -4 129 0.0 8.24 5.7 5.7 06/27/2021 13:32:16 -8 120 0.0 8.24 5.7 5.7 06/27/2021 13:32:36 -9 103 0.0 8.24 5.7 5.7 06/27/2021 13:32:56 -7 128 0.0 8.24 5.7 5.7 06/27/2021 13:33:16 -12 99 0.0 8.24 5.7 5.7 06/27/2021 13:33:36 -7 100 0.0 8.24 5.7 5.7 06/27/2021 13:33:56 -2 130 0.0 8.24 5.7 5.7 06/27/2021 13:34:16 -5 116 0.0 8.24 5.7 5.7 06/27/2021 13:34:36 -3 130 0.0 8.24 5.7 5.7 06/27/2021 13:34:56 -7 119 0.0 8.24 5.7 5.7 06/27/2021 13:35:16 -4 131 0.0 8.24 5.7 5.7 06/27/2021 13:35:36 -7 118 0.0 8.24 5.7 5.7 06/27/2021 13:35:56 -4 138 0.0 8.24 5.7 5.7 06/27/2021 13:36:16 -6 113 0.0 8.24 5.7 5.7 06/27/2021 13:36:36 -4 116 0.0 8.24 5.7 5.7 06/27/2021 13:36:56 -6 120 0.0 8.24 5.7 5.7 06/27/2021 13:37:16 -7 127 0.0 8.24 5.7 5.7 06/27/2021 13:37:36 -3 122 0.0 8.24 5.7 5.7 06/27/2021 13:37:56 -5 117 0.0 8.24 5.7 5.7 06/27/2021 13:38:16 -7 119 0.0 8.24 5.7 5.7 06/27/2021 13:38:36 -7 118 0.0 8.24 5.7 5.7 06/27/2021 13:38:56 -7 112 0.0 8.24 5.7 5.7 06/27/2021 13:39:16 -8 127 0.0 8.24 5.7 5.7 06/27/2021 13:39:36 -7 111 0.0 8.24 5.7 5.7 06/27/2021 13:39:56 -9 103 0.0 8.24 5.7 5.7 06/27/2021 13:40:16 -5 124 0.0 8.24 5.7 5.7 06/27/2021 13:40:36 -7 108 0.0 8.24 5.7 5.7 06/27/2021 13:40:56 -7 119 0.0 8.24 5.7 5.7 06/27/2021 13:41:16 -8 121 0.0 8.24 5.7 5.7 06/27/2021 13:41:36 -7 112 0.0 8.24 5.7 5.7 06/27/2021 13:41:56 -5 139 0.0 8.24 5.7 5.7 Page 21 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 13:42:36 -9 105 0.0 8.24 5.7 5.7 06/27/2021 13:42:56 -7 118 0.0 8.24 5.7 5.7 06/27/2021 13:43:16 1 177 0.0 8.24 5.7 5.7 06/27/2021 13:43:36 -8 106 0.0 8.24 5.7 5.7 06/27/2021 13:43:56 -5 107 0.0 8.24 5.7 5.7 06/27/2021 13:44:16 -3 137 0.0 8.24 5.7 5.7 06/27/2021 13:44:36 -5 120 0.0 8.24 5.7 5.7 06/27/2021 13:44:56 -6 134 0.0 8.23 5.7 5.7 06/27/2021 13:45:16 -7 127 0.0 8.24 5.7 5.7 06/27/2021 13:45:36 -3 132 0.0 8.24 5.7 5.7 06/27/2021 13:45:56 -6 120 0.0 8.24 5.7 5.7 06/27/2021 13:46:16 -5 108 0.0 8.24 5.7 5.7 06/27/2021 13:46:36 -6 137 0.0 8.24 5.7 5.7 06/27/2021 13:46:56 -4 118 0.0 8.24 5.7 5.7 06/27/2021 13:47:16 -3 139 0.0 8.24 5.7 5.7 06/27/2021 13:47:36 -5 120 0.0 8.24 5.7 5.7 06/27/2021 13:47:56 -3 141 0.0 8.24 5.7 5.7 06/27/2021 13:48:16 -3 121 0.0 8.24 5.7 5.7 06/27/2021 13:48:36 -3 132 0.0 8.23 5.7 5.7 06/27/2021 13:48:56 -6 117 0.0 8.24 5.7 5.7 06/27/2021 13:49:16 -3 135 0.0 8.24 5.7 5.7 06/27/2021 13:49:36 -5 122 0.0 8.24 5.7 5.7 06/27/2021 13:49:56 -5 133 0.0 8.24 5.7 5.7 06/27/2021 13:50:16 -6 127 0.0 8.24 5.7 5.7 06/27/2021 13:50:36 -5 130 0.0 8.24 5.7 5.7 06/27/2021 13:50:56 -7 125 0.0 8.24 5.7 5.7 06/27/2021 13:51:16 -1 135 0.0 8.24 5.7 5.7 06/27/2021 13:51:36 -5 131 0.0 8.24 5.7 5.7 06/27/2021 13:51:56 -3 133 0.0 8.24 5.7 5.7 06/27/2021 13:52:16 -5 131 0.0 8.24 5.7 5.7 06/27/2021 13:52:36 -7 129 0.0 8.23 5.7 5.7 06/27/2021 13:52:56 -6 124 0.0 8.24 5.7 5.7 06/27/2021 13:52:58 -5 132 0.0 8.23 5.7 5.7 Reset Total, Vol = 5.73 bbl 06/27/2021 13:53:16 -3 129 0.0 8.23 0.0 0.0 06/27/2021 13:53:36 -8 120 0.0 8.24 0.0 0.0 06/27/2021 13:53:56 -7 119 0.0 8.24 0.0 0.0 06/27/2021 13:54:16 -6 131 0.0 8.24 0.0 0.0 06/27/2021 13:54:36 -6 108 0.0 8.24 0.0 0.0 06/27/2021 13:54:56 -3 134 0.0 8.24 0.0 0.0 06/27/2021 13:55:16 -8 117 0.0 8.24 0.0 0.0 06/27/2021 13:55:36 -4 135 0.0 8.24 0.0 0.0 06/27/2021 13:55:56 -5 121 0.0 8.24 0.0 0.0 06/27/2021 13:56:16 -4 137 0.0 8.24 0.0 0.0 06/27/2021 13:56:36 -7 122 0.0 8.23 0.0 0.0 06/27/2021 13:56:56 -5 136 0.0 8.24 0.0 0.0 06/27/2021 13:57:16 -5 123 0.0 8.24 0.0 0.0 06/27/2021 13:57:36 -6 133 0.0 8.24 0.0 0.0 06/27/2021 13:57:56 -6 125 0.0 8.24 0.0 0.0 06/27/2021 13:58:16 -3 137 0.0 8.24 0.0 0.0 06/27/2021 13:58:36 -6 127 0.0 8.24 0.0 0.0 06/27/2021 13:58:56 -6 136 0.0 8.24 0.0 0.0 06/27/2021 13:59:16 -6 132 0.0 8.23 0.0 0.0 06/27/2021 13:59:36 -5 134 0.0 8.23 0.0 0.0 06/27/2021 13:59:56 -7 113 0.0 8.24 0.0 0.0 Page 22 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 14:00:36 -6 124 0.0 7.86 0.0 0.0 06/27/2021 14:00:56 -7 116 0.0 7.81 0.0 0.0 06/27/2021 14:01:16 -6 136 0.0 7.78 0.0 0.0 06/27/2021 14:01:36 -7 117 0.0 7.76 0.0 0.0 06/27/2021 14:01:56 -7 101 0.0 7.74 0.0 0.0 06/27/2021 14:02:16 -5 108 0.0 7.72 0.0 0.0 06/27/2021 14:02:36 -10 96 0.0 7.71 0.0 0.0 06/27/2021 14:02:56 -8 111 0.0 7.71 0.0 0.0 06/27/2021 14:03:16 -7 113 0.0 7.70 0.0 0.0 06/27/2021 14:03:36 -14 98 0.0 7.70 0.0 0.0 06/27/2021 14:03:56 -8 106 0.0 7.70 0.0 0.0 06/27/2021 14:04:16 -9 103 0.0 7.69 0.0 0.0 06/27/2021 14:04:36 -9 98 0.0 7.70 0.0 0.0 06/27/2021 14:04:56 -7 122 0.0 7.69 0.0 0.0 06/27/2021 14:05:16 -10 116 0.0 7.70 0.0 0.0 06/27/2021 14:05:36 -5 105 0.0 7.69 0.0 0.0 06/27/2021 14:05:56 -8 128 0.0 7.70 0.0 0.0 06/27/2021 14:06:16 -8 114 0.0 7.70 0.0 0.0 06/27/2021 14:06:36 -8 114 0.0 7.70 0.0 0.0 06/27/2021 14:06:56 -7 112 0.0 7.70 0.0 0.0 06/27/2021 14:07:16 -10 104 0.0 7.70 0.0 0.0 06/27/2021 14:07:36 -9 116 0.0 7.70 0.0 0.0 06/27/2021 14:07:56 -10 96 0.0 7.71 0.0 0.0 06/27/2021 14:08:16 -8 105 0.0 7.70 0.0 0.0 06/27/2021 14:08:36 -9 97 0.0 7.70 0.0 0.0 06/27/2021 14:08:56 -12 102 0.0 7.70 0.0 0.0 06/27/2021 14:09:16 -9 105 0.0 7.71 0.0 0.0 06/27/2021 14:09:36 -12 109 0.0 7.71 0.0 0.0 06/27/2021 14:09:56 -6 130 0.0 7.71 0.0 0.0 06/27/2021 14:10:16 -10 123 0.0 7.71 0.0 0.0 06/27/2021 14:10:36 -12 122 0.0 7.71 0.0 0.0 06/27/2021 14:10:56 -10 109 0.0 7.71 0.0 0.0 06/27/2021 14:11:16 -9 106 0.0 7.71 0.0 0.0 06/27/2021 14:11:36 -9 107 0.0 7.72 0.0 0.0 06/27/2021 14:11:56 -11 109 0.0 7.72 0.0 0.0 06/27/2021 14:12:16 -12 106 0.0 7.71 0.0 0.0 06/27/2021 14:12:36 -5 123 0.0 7.72 0.0 0.0 06/27/2021 14:12:56 -7 115 0.0 7.72 0.0 0.0 06/27/2021 14:13:16 -5 124 0.0 7.72 0.0 0.0 06/27/2021 14:13:36 -4 131 0.0 7.72 0.0 0.0 06/27/2021 14:13:56 -9 108 0.0 7.72 0.0 0.0 06/27/2021 14:14:16 -8 104 0.0 7.72 0.0 0.0 06/27/2021 14:14:36 -8 114 0.0 7.73 0.0 0.0 06/27/2021 14:14:56 -6 119 0.0 7.72 0.0 0.0 06/27/2021 14:15:16 -7 118 0.0 7.72 0.0 0.0 06/27/2021 14:15:36 -9 131 0.0 7.73 0.0 0.0 06/27/2021 14:15:56 -5 129 0.0 7.72 0.0 0.0 06/27/2021 14:16:16 -7 114 0.0 7.72 0.0 0.0 06/27/2021 14:16:36 -11 114 0.0 7.73 0.0 0.0 06/27/2021 14:16:56 -10 115 0.0 7.72 0.0 0.0 06/27/2021 14:17:16 -7 109 0.0 7.73 0.0 0.0 06/27/2021 14:17:36 -7 116 0.0 7.73 0.0 0.0 06/27/2021 14:17:56 -7 119 0.0 7.73 0.0 0.0 06/27/2021 14:18:16 -7 107 0.0 7.73 0.0 0.0 Page 23 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 14:18:56 -8 112 0.0 7.73 0.0 0.0 06/27/2021 14:19:16 -5 114 0.0 7.73 0.0 0.0 06/27/2021 14:19:36 -11 108 0.0 7.74 0.0 0.0 06/27/2021 14:19:56 -4 125 0.0 7.73 0.0 0.0 06/27/2021 14:20:16 -6 126 0.0 7.73 0.0 0.0 06/27/2021 14:20:36 -6 130 0.0 7.73 0.0 0.0 06/27/2021 14:20:56 -8 101 0.0 7.73 0.0 0.0 06/27/2021 14:21:16 -8 107 0.0 7.73 0.0 0.0 06/27/2021 14:21:36 -7 102 0.0 7.73 0.0 0.0 06/27/2021 14:21:56 -10 109 0.0 7.73 0.0 0.0 06/27/2021 14:22:16 -5 123 0.0 7.73 0.0 0.0 06/27/2021 14:22:36 -8 114 0.0 7.74 0.0 0.0 06/27/2021 14:22:56 -9 111 0.0 7.73 0.0 0.0 06/27/2021 14:23:16 -8 101 0.0 7.73 0.0 0.0 06/27/2021 14:23:36 -7 108 0.0 7.73 0.0 0.0 06/27/2021 14:23:56 -9 110 0.0 7.73 0.0 0.0 06/27/2021 14:24:16 -6 106 0.0 7.74 0.0 0.0 06/27/2021 14:24:36 -8 115 0.0 7.73 0.0 0.0 06/27/2021 14:24:56 -5 129 0.0 7.73 0.0 0.0 06/27/2021 14:25:16 -5 121 0.0 7.74 0.0 0.0 06/27/2021 14:25:36 -3 149 0.0 7.73 0.0 0.0 06/27/2021 14:25:56 -7 115 0.0 7.74 0.0 0.0 06/27/2021 14:26:16 -3 136 0.0 7.74 0.0 0.0 06/27/2021 14:26:36 -5 116 0.0 7.73 0.0 0.0 06/27/2021 14:26:56 -8 120 0.0 7.73 0.0 0.0 06/27/2021 14:27:16 -7 122 0.0 7.74 0.0 0.0 06/27/2021 14:27:36 -9 119 0.0 7.74 0.0 0.0 06/27/2021 14:27:56 -6 119 0.0 7.74 0.0 0.0 06/27/2021 14:28:16 -3 128 0.0 7.74 0.0 0.0 06/27/2021 14:28:36 -6 116 0.0 7.74 0.0 0.0 06/27/2021 14:28:56 -12 107 0.0 7.74 0.0 0.0 06/27/2021 14:29:16 -5 136 0.0 7.74 0.0 0.0 06/27/2021 14:29:36 -6 119 0.0 7.74 0.0 0.0 06/27/2021 14:29:56 -8 130 0.0 7.74 0.0 0.0 06/27/2021 14:30:16 -9 116 0.0 7.74 0.0 0.0 06/27/2021 14:30:36 -7 130 0.0 7.74 0.0 0.0 06/27/2021 14:30:56 -8 119 0.0 7.74 0.0 0.0 06/27/2021 14:31:16 -6 129 0.0 7.74 0.0 0.0 06/27/2021 14:31:36 -7 122 0.0 7.74 0.0 0.0 06/27/2021 14:31:56 -5 132 0.0 7.75 0.0 0.0 06/27/2021 14:32:16 -9 114 0.0 7.75 0.0 0.0 06/27/2021 14:32:36 -5 132 0.0 7.74 0.0 0.0 06/27/2021 14:32:56 -7 115 0.0 7.74 0.0 0.0 06/27/2021 14:33:16 -5 131 0.0 7.74 0.0 0.0 06/27/2021 14:33:36 -9 112 0.0 7.74 0.0 0.0 06/27/2021 14:33:56 -5 136 0.0 7.75 0.0 0.0 06/27/2021 14:34:16 -7 111 0.0 7.74 0.0 0.0 06/27/2021 14:34:36 -4 139 0.0 7.74 0.0 0.0 06/27/2021 14:34:56 -6 135 0.0 7.74 0.0 0.0 06/27/2021 14:35:16 -5 115 0.0 7.74 0.0 0.0 06/27/2021 14:35:36 -6 134 0.0 7.75 0.0 0.0 06/27/2021 14:35:56 -5 125 0.0 7.74 0.0 0.0 06/27/2021 14:36:16 -5 127 0.0 7.74 0.0 0.0 06/27/2021 14:36:36 -6 125 0.0 7.75 0.0 0.0 Page 24 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 14:37:16 -5 120 0.0 7.75 0.0 0.0 06/27/2021 14:37:36 -6 129 0.0 7.74 0.0 0.0 06/27/2021 14:37:56 -5 117 0.0 7.75 0.0 0.0 06/27/2021 14:38:16 -5 138 0.0 7.75 0.0 0.0 06/27/2021 14:38:36 -6 122 0.0 7.75 0.0 0.0 06/27/2021 14:38:56 -6 136 0.0 7.74 0.0 0.0 06/27/2021 14:39:16 -7 130 0.0 7.75 0.0 0.0 06/27/2021 14:39:36 -6 114 0.0 7.74 0.0 0.0 06/27/2021 14:39:56 -5 127 0.0 7.75 0.0 0.0 06/27/2021 14:40:16 -4 127 0.0 7.75 0.0 0.0 06/27/2021 14:40:36 -4 136 0.0 7.75 0.0 0.0 06/27/2021 14:40:56 -7 124 0.0 7.75 0.0 0.0 06/27/2021 14:41:16 -5 132 0.0 7.75 0.0 0.0 06/27/2021 14:41:36 -7 125 0.0 7.75 0.0 0.0 06/27/2021 14:41:56 -2 136 0.0 7.75 0.0 0.0 06/27/2021 14:42:16 -6 123 0.0 7.75 0.0 0.0 06/27/2021 14:42:36 -5 137 0.0 7.75 0.0 0.0 06/27/2021 14:42:56 -6 117 0.0 7.75 0.0 0.0 06/27/2021 14:43:16 -4 135 0.0 7.74 0.0 0.0 06/27/2021 14:43:36 -5 124 0.0 7.75 0.0 0.0 06/27/2021 14:43:56 -4 138 0.0 7.75 0.0 0.0 06/27/2021 14:44:16 -6 136 0.0 7.75 0.0 0.0 06/27/2021 14:44:36 -8 113 0.0 7.75 0.0 0.0 06/27/2021 14:44:56 -3 140 0.0 7.75 0.0 0.0 06/27/2021 14:45:16 -6 122 0.0 7.75 0.0 0.0 06/27/2021 14:45:36 -4 129 0.0 7.75 0.0 0.0 06/27/2021 14:45:56 -6 125 0.0 7.75 0.0 0.0 06/27/2021 14:46:16 -2 136 0.0 7.75 0.0 0.0 06/27/2021 14:46:36 -3 126 0.0 7.75 0.0 0.0 06/27/2021 14:46:56 -3 136 0.0 7.76 0.0 0.0 06/27/2021 14:47:16 -6 123 0.0 7.75 0.0 0.0 06/27/2021 14:47:36 -4 134 0.0 7.75 0.0 0.0 06/27/2021 14:47:56 -4 119 0.0 7.75 0.0 0.0 06/27/2021 14:48:16 -4 137 0.0 7.75 0.0 0.0 06/27/2021 14:48:36 -7 114 0.0 7.76 0.0 0.0 06/27/2021 14:48:56 -1 140 0.0 7.75 0.0 0.0 06/27/2021 14:49:16 -8 136 0.0 7.76 0.0 0.0 06/27/2021 14:49:36 -6 119 0.0 7.75 0.0 0.0 06/27/2021 14:49:56 -4 141 0.0 7.75 0.0 0.0 06/27/2021 14:50:16 -5 125 0.0 7.75 0.0 0.0 06/27/2021 14:50:36 -2 134 0.0 7.75 0.0 0.0 06/27/2021 14:50:56 -4 127 0.0 7.75 0.0 0.0 06/27/2021 14:51:16 -5 137 0.0 7.76 0.0 0.0 06/27/2021 14:51:36 -4 125 0.0 7.76 0.0 0.0 06/27/2021 14:51:56 -5 135 0.0 7.76 0.0 0.0 06/27/2021 14:52:16 -5 128 0.0 7.75 0.0 0.0 06/27/2021 14:52:36 -6 136 0.0 7.76 0.0 0.0 06/27/2021 14:52:56 -6 122 0.0 7.76 0.0 0.0 06/27/2021 14:53:16 -4 136 0.0 7.75 0.0 0.0 06/27/2021 14:53:36 -5 115 0.0 7.75 0.0 0.0 06/27/2021 14:53:56 -3 138 0.0 7.76 0.0 0.0 06/27/2021 14:54:16 -7 115 0.0 7.76 0.0 0.0 06/27/2021 14:54:36 -7 119 0.0 7.76 0.0 0.0 06/27/2021 14:54:56 -2 135 0.0 7.76 0.0 0.0 Page 25 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 14:55:36 -3 130 0.0 7.76 0.0 0.0 06/27/2021 14:55:56 -6 139 0.0 7.76 0.0 0.0 06/27/2021 14:56:16 -2 136 0.0 7.76 0.0 0.0 06/27/2021 14:56:36 -4 125 0.0 7.75 0.0 0.0 06/27/2021 14:56:56 5 142 0.0 7.76 0.0 0.0 06/27/2021 14:57:16 -4 126 0.0 7.76 0.0 0.0 06/27/2021 14:57:36 -2 130 0.0 7.76 0.0 0.0 06/27/2021 14:57:56 -4 120 0.0 7.76 0.0 0.0 06/27/2021 14:58:16 -2 136 0.0 7.75 0.0 0.0 06/27/2021 14:58:36 -5 123 0.0 7.76 0.0 0.0 06/27/2021 14:58:56 -3 138 0.0 7.75 0.0 0.0 06/27/2021 14:59:16 -8 122 0.0 7.76 0.0 0.0 06/27/2021 14:59:36 -5 119 0.0 7.76 0.0 0.0 06/27/2021 14:59:56 -3 134 0.0 7.76 0.0 0.0 06/27/2021 15:00:16 -6 123 0.0 7.76 0.0 0.0 06/27/2021 15:00:36 -4 143 0.0 7.76 0.0 0.0 06/27/2021 15:00:56 -3 134 0.0 7.76 0.0 0.0 06/27/2021 15:01:16 -2 137 0.0 7.76 0.0 0.0 06/27/2021 15:01:36 -6 127 0.0 7.76 0.0 0.0 06/27/2021 15:01:56 -6 134 0.0 7.76 0.0 0.0 06/27/2021 15:02:16 -6 122 0.0 7.76 0.0 0.0 06/27/2021 15:02:36 -5 139 0.0 7.76 0.0 0.0 06/27/2021 15:02:56 -3 122 0.0 7.76 0.0 0.0 06/27/2021 15:03:16 -3 136 0.0 7.76 0.0 0.0 06/27/2021 15:03:36 -7 119 0.0 7.76 0.0 0.0 06/27/2021 15:03:56 -3 141 0.0 7.76 0.0 0.0 06/27/2021 15:04:16 -4 127 0.0 7.76 0.0 0.0 06/27/2021 15:04:36 -5 139 0.0 7.76 0.0 0.0 06/27/2021 15:04:56 -7 125 0.0 7.76 0.0 0.0 06/27/2021 15:05:16 -6 135 0.0 7.76 0.0 0.0 06/27/2021 15:05:36 -2 128 0.0 7.77 0.0 0.0 06/27/2021 15:05:56 -2 135 0.0 7.76 0.0 0.0 06/27/2021 15:06:16 -4 128 0.0 7.76 0.0 0.0 06/27/2021 15:06:36 -3 140 0.0 7.76 0.0 0.0 06/27/2021 15:06:56 -4 128 0.0 7.76 0.0 0.0 06/27/2021 15:07:16 -3 139 0.0 7.76 0.0 0.0 06/27/2021 15:07:36 -2 139 0.0 7.76 0.0 0.0 06/27/2021 15:07:56 -4 140 0.0 7.76 0.0 0.0 06/27/2021 15:08:16 -5 146 0.0 7.77 0.0 0.0 06/27/2021 15:08:36 -4 142 0.0 7.76 0.0 0.0 06/27/2021 15:08:56 -7 121 0.0 7.77 0.0 0.0 06/27/2021 15:09:16 -4 137 0.0 7.76 0.0 0.0 06/27/2021 15:09:36 -5 129 0.0 7.76 0.0 0.0 06/27/2021 15:09:56 -3 138 0.0 7.76 0.0 0.0 06/27/2021 15:10:16 -5 116 0.0 7.76 0.0 0.0 06/27/2021 15:10:36 -1 145 0.0 7.76 0.0 0.0 06/27/2021 15:10:56 -7 123 0.0 7.76 0.0 0.0 06/27/2021 15:11:16 -4 137 0.0 7.76 0.0 0.0 06/27/2021 15:11:36 -6 121 0.0 7.76 0.0 0.0 06/27/2021 15:11:56 -7 136 0.0 7.77 0.0 0.0 06/27/2021 15:12:16 -7 116 0.0 7.76 0.0 0.0 06/27/2021 15:12:36 -3 136 0.0 7.76 0.0 0.0 06/27/2021 15:12:56 -8 116 0.0 7.77 0.0 0.0 06/27/2021 15:13:16 -4 130 0.0 7.76 0.0 0.0 Page 26 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 15:13:56 -3 136 0.0 7.77 0.0 0.0 06/27/2021 15:14:16 -9 119 0.0 7.77 0.0 0.0 06/27/2021 15:14:36 -7 133 0.0 7.76 0.0 0.0 06/27/2021 15:14:56 -7 116 0.0 7.77 0.0 0.0 06/27/2021 15:15:16 -5 122 0.0 7.76 0.0 0.0 06/27/2021 15:15:36 -7 120 0.0 7.76 0.0 0.0 06/27/2021 15:15:56 -8 133 0.0 7.77 0.0 0.0 06/27/2021 15:16:36 -9 111 0.0 7.77 0.0 0.0 06/27/2021 15:16:56 -4 126 0.0 7.77 0.0 0.0 06/27/2021 15:17:16 -8 114 0.0 7.77 0.0 0.0 06/27/2021 15:17:36 -4 121 0.0 7.76 0.0 0.0 06/27/2021 15:17:56 -6 109 0.0 7.77 0.0 0.0 06/27/2021 15:18:16 -5 136 0.0 7.77 0.0 0.0 06/27/2021 15:18:36 -5 121 0.0 7.77 0.0 0.0 06/27/2021 15:18:56 -3 134 0.0 7.77 0.0 0.0 06/27/2021 15:19:16 -8 115 0.0 7.77 0.0 0.0 06/27/2021 15:19:36 -5 137 0.0 7.76 0.0 0.0 06/27/2021 15:19:56 -5 126 0.0 7.76 0.0 0.0 06/27/2021 15:20:16 -3 136 0.0 7.77 0.0 0.0 06/27/2021 15:20:36 -7 129 0.0 7.76 0.0 0.0 06/27/2021 15:20:56 -4 139 0.0 7.77 0.0 0.0 06/27/2021 15:21:16 -5 118 0.0 7.77 0.0 0.0 06/27/2021 15:21:36 -3 140 0.0 7.77 0.0 0.0 06/27/2021 15:21:56 -6 128 0.0 7.77 0.0 0.0 06/27/2021 15:22:16 -3 141 0.0 7.77 0.0 0.0 06/27/2021 15:22:36 -7 118 0.0 7.77 0.0 0.0 06/27/2021 15:22:56 -4 140 0.0 7.77 0.0 0.0 06/27/2021 15:23:16 -4 119 0.0 7.77 0.0 0.0 06/27/2021 15:23:36 0 139 0.0 7.77 0.0 0.0 06/27/2021 15:23:56 -5 118 0.0 7.77 0.0 0.0 06/27/2021 15:24:16 -3 132 0.0 7.77 0.0 0.0 06/27/2021 15:24:36 -7 126 0.0 7.77 0.0 0.0 06/27/2021 15:24:56 -2 139 0.0 7.77 0.0 0.0 06/27/2021 15:25:16 -6 119 0.0 7.77 0.0 0.0 06/27/2021 15:25:36 -5 137 0.0 7.77 0.0 0.0 06/27/2021 15:25:56 -7 125 0.0 7.77 0.0 0.0 06/27/2021 15:26:16 -4 134 0.0 7.77 0.0 0.0 06/27/2021 15:26:36 -9 107 0.0 7.77 0.0 0.0 06/27/2021 15:26:56 -5 112 0.0 7.77 0.0 0.0 06/27/2021 15:27:16 -6 141 0.0 7.77 0.0 0.0 06/27/2021 15:27:36 -7 120 0.0 7.77 0.0 0.0 06/27/2021 15:27:56 -5 108 0.0 7.77 0.0 0.0 06/27/2021 15:28:16 -9 112 0.0 7.76 0.0 0.0 06/27/2021 15:28:36 -5 117 0.0 7.77 0.0 0.0 06/27/2021 15:28:56 -8 109 0.0 7.77 0.0 0.0 06/27/2021 15:29:16 -9 114 0.0 7.77 0.0 0.0 06/27/2021 15:29:36 -4 126 0.0 7.77 0.0 0.0 06/27/2021 15:29:56 -5 137 0.0 7.77 0.0 0.0 06/27/2021 15:30:16 -3 126 0.0 7.77 0.0 0.0 06/27/2021 15:30:36 -3 135 0.0 7.77 0.0 0.0 06/27/2021 15:30:56 -4 118 0.0 7.76 0.0 0.0 06/27/2021 15:31:16 -7 115 0.0 7.77 0.0 0.0 06/27/2021 15:31:36 -4 137 0.0 7.77 0.0 0.0 06/27/2021 15:31:56 -6 126 0.0 7.77 0.0 0.0 Page 27 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 15:32:36 -7 115 0.0 7.77 0.0 0.0 06/27/2021 15:32:56 -9 107 0.0 7.77 0.0 0.0 06/27/2021 15:33:16 -3 137 0.0 7.77 0.0 0.0 06/27/2021 15:33:36 -8 119 0.0 7.77 0.0 0.0 06/27/2021 15:33:56 -6 129 0.0 7.77 0.0 0.0 06/27/2021 15:34:16 -5 133 0.0 7.77 0.0 0.0 06/27/2021 15:34:36 -8 111 0.0 7.77 0.0 0.0 06/27/2021 15:34:56 -6 134 0.0 7.76 0.0 0.0 06/27/2021 15:35:16 -5 120 0.0 7.76 0.0 0.0 06/27/2021 15:35:36 -4 132 0.0 7.77 0.0 0.0 06/27/2021 15:35:56 -5 133 0.0 7.77 0.0 0.0 06/27/2021 15:36:16 -6 130 0.0 7.77 0.0 0.0 06/27/2021 15:36:36 -6 130 0.0 7.76 0.0 0.0 06/27/2021 15:36:56 -5 122 0.0 7.77 0.0 0.0 06/27/2021 15:37:16 -5 138 0.0 7.76 0.0 0.0 06/27/2021 15:37:36 -4 136 0.0 7.76 0.0 0.0 06/27/2021 15:37:56 -5 128 0.0 7.76 0.0 0.0 06/27/2021 15:38:16 -3 132 0.0 7.76 0.0 0.0 06/27/2021 15:38:36 -5 121 0.0 7.77 0.0 0.0 06/27/2021 15:38:56 -4 137 0.0 7.77 0.0 0.0 06/27/2021 15:39:16 -4 140 0.0 7.77 0.0 0.0 06/27/2021 15:39:36 -9 108 0.0 7.77 0.0 0.0 06/27/2021 15:39:56 -3 134 0.0 7.76 0.0 0.0 06/27/2021 15:40:16 -6 128 0.0 7.77 0.0 0.0 06/27/2021 15:40:36 -3 134 0.0 7.77 0.0 0.0 06/27/2021 15:40:56 -5 121 0.0 7.77 0.0 0.0 06/27/2021 15:41:16 -5 147 0.0 7.77 0.0 0.0 06/27/2021 15:41:36 -5 114 0.0 7.76 0.0 0.0 06/27/2021 15:41:56 -4 122 0.0 7.77 0.0 0.0 06/27/2021 15:42:16 -4 137 0.0 7.76 0.0 0.0 06/27/2021 15:42:36 -3 132 0.0 7.77 0.0 0.0 06/27/2021 15:42:56 -4 143 0.0 7.77 0.0 0.0 06/27/2021 15:43:16 -4 126 0.0 7.77 0.0 0.0 06/27/2021 15:43:36 -3 139 0.0 7.77 0.0 0.0 06/27/2021 15:43:56 -7 124 0.0 7.76 0.0 0.0 06/27/2021 15:44:16 -4 141 0.0 7.77 0.0 0.0 06/27/2021 15:44:36 -2 145 0.0 7.77 0.0 0.0 06/27/2021 15:44:56 -8 131 0.0 7.76 0.0 0.0 06/27/2021 15:45:16 -6 137 0.0 7.77 0.0 0.0 06/27/2021 15:45:36 -6 125 0.0 7.76 0.0 0.0 06/27/2021 15:45:56 -1 135 0.0 7.76 0.0 0.0 06/27/2021 15:46:16 -5 115 0.0 7.77 0.0 0.0 06/27/2021 15:46:36 -2 136 0.0 7.76 0.0 0.0 06/27/2021 15:46:56 3 137 0.0 7.76 0.0 0.0 06/27/2021 15:47:16 -5 120 0.0 7.76 0.0 0.0 06/27/2021 15:47:36 4 139 0.0 7.77 0.0 0.0 06/27/2021 15:47:56 1 125 0.0 7.76 0.0 0.0 06/27/2021 15:48:16 3 136 0.0 7.77 0.0 0.0 06/27/2021 15:48:36 -2 125 0.0 7.76 0.0 0.0 06/27/2021 15:48:56 5 142 0.0 7.76 0.0 0.0 06/27/2021 15:49:16 -7 118 0.0 7.76 0.0 0.0 06/27/2021 15:49:36 0 117 0.0 7.76 0.0 0.0 06/27/2021 15:49:56 6 149 0.0 7.76 0.0 0.0 06/27/2021 15:50:16 0 131 0.0 7.76 0.0 0.0 Page 28 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 15:50:56 -2 125 0.0 7.76 0.0 0.0 06/27/2021 15:51:16 1 144 0.0 7.76 0.0 0.0 06/27/2021 15:51:36 -1 125 0.0 7.76 0.0 0.0 06/27/2021 15:51:56 3 141 0.0 7.76 0.0 0.0 06/27/2021 15:52:16 1 129 0.0 7.76 0.0 0.0 06/27/2021 15:52:36 2 136 0.0 7.76 0.0 0.0 06/27/2021 15:52:56 1 126 0.0 7.76 0.0 0.0 06/27/2021 15:53:16 -4 115 0.0 7.76 0.0 0.0 06/27/2021 15:53:36 3 137 0.0 7.76 0.0 0.0 06/27/2021 15:53:56 -5 114 0.0 7.75 0.0 0.0 06/27/2021 15:54:16 3 138 0.0 7.76 0.0 0.0 06/27/2021 15:54:36 1 128 0.0 7.75 0.0 0.0 06/27/2021 15:54:56 4 141 0.0 7.75 0.0 0.0 06/27/2021 15:55:16 -4 125 0.0 7.75 0.0 0.0 06/27/2021 15:55:36 2 130 0.0 7.75 0.0 0.0 06/27/2021 15:55:56 -2 124 0.0 7.75 0.0 0.0 06/27/2021 15:56:16 2 135 0.0 7.75 0.0 0.0 06/27/2021 15:56:36 -2 120 0.0 7.75 0.0 0.0 06/27/2021 15:56:56 1 141 0.0 7.75 0.0 0.0 06/27/2021 15:57:16 -3 107 0.0 7.75 0.0 0.0 06/27/2021 15:57:36 -2 119 0.0 7.75 0.0 0.0 06/27/2021 15:57:56 4 134 0.0 7.75 0.0 0.0 06/27/2021 15:58:16 -4 113 0.0 7.75 0.0 0.0 06/27/2021 15:58:36 -1 138 0.0 7.74 0.0 0.0 06/27/2021 15:58:56 0 123 0.0 7.75 0.0 0.0 06/27/2021 15:59:16 3 134 0.0 7.74 0.0 0.0 06/27/2021 15:59:36 -1 128 0.0 7.74 0.0 0.0 06/27/2021 15:59:56 4 136 0.0 7.74 0.0 0.0 06/27/2021 16:00:16 0 125 0.0 7.75 0.0 0.0 06/27/2021 16:00:36 3 136 0.0 7.74 0.0 0.0 06/27/2021 16:00:56 -1 123 0.0 7.74 0.0 0.0 06/27/2021 16:01:16 1 136 0.0 7.74 0.0 0.0 06/27/2021 16:01:36 -1 117 0.0 7.74 0.0 0.0 06/27/2021 16:01:56 3 143 0.0 7.74 0.0 0.0 06/27/2021 16:02:16 -8 111 0.0 7.74 0.0 0.0 06/27/2021 16:02:36 -2 122 0.0 7.74 0.0 0.0 06/27/2021 16:02:56 3 136 0.0 7.74 0.0 0.0 06/27/2021 16:03:16 -2 126 0.0 7.73 0.0 0.0 06/27/2021 16:03:36 3 140 0.0 7.73 0.0 0.0 06/27/2021 16:03:56 1 137 0.0 7.74 0.0 0.0 06/27/2021 16:04:16 4 142 0.0 7.74 0.0 0.0 06/27/2021 16:04:36 -1 128 0.0 7.73 0.0 0.0 06/27/2021 16:04:56 2 137 0.0 7.74 0.0 0.0 06/27/2021 16:05:16 -1 125 0.0 7.73 0.0 0.0 06/27/2021 16:05:36 3 135 0.0 7.73 0.0 0.0 06/27/2021 16:05:56 -1 121 0.0 7.73 0.0 0.0 06/27/2021 16:06:16 4 146 0.0 7.73 0.0 0.0 06/27/2021 16:06:36 -5 119 0.0 7.73 0.0 0.0 06/27/2021 16:06:56 3 135 0.0 7.73 0.0 0.0 06/27/2021 16:07:16 2 124 0.0 7.73 0.0 0.0 06/27/2021 16:07:36 -3 114 0.0 7.72 0.0 0.0 06/27/2021 16:07:56 6 137 0.0 7.72 0.0 0.0 06/27/2021 16:08:16 1 120 0.0 7.73 0.0 0.0 06/27/2021 16:08:36 4 142 0.0 7.73 0.0 0.0 Page 29 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 16:09:16 3 134 0.0 7.72 0.0 0.0 06/27/2021 16:09:36 -1 127 0.0 7.73 0.0 0.0 06/27/2021 16:09:56 3 144 0.0 7.73 0.0 0.0 06/27/2021 16:10:16 -3 123 0.0 7.72 0.0 0.0 06/27/2021 16:10:36 3 143 0.0 7.72 0.0 0.0 06/27/2021 16:10:56 -1 125 0.0 7.72 0.0 0.0 06/27/2021 16:11:16 5 143 0.0 7.73 0.0 0.0 06/27/2021 16:11:36 -0 127 0.0 7.72 0.0 0.0 06/27/2021 16:11:56 3 138 0.0 7.72 0.0 0.0 06/27/2021 16:12:16 -0 137 0.0 7.72 0.0 0.0 06/27/2021 16:12:36 -4 116 0.0 7.72 0.0 0.0 06/27/2021 16:12:56 4 139 0.0 7.72 0.0 0.0 06/27/2021 16:13:16 -3 115 0.0 7.72 0.0 0.0 06/27/2021 16:13:36 0 136 0.0 7.72 0.0 0.0 06/27/2021 16:13:56 -1 138 0.0 7.71 0.0 0.0 06/27/2021 16:14:16 2 139 0.0 7.71 0.0 0.0 06/27/2021 16:14:36 1 127 0.0 7.72 0.0 0.0 06/27/2021 16:14:56 3 141 0.0 7.71 0.0 0.0 06/27/2021 16:15:16 -1 130 0.0 7.72 0.0 0.0 06/27/2021 16:15:36 2 139 0.0 7.72 0.0 0.0 06/27/2021 16:15:56 2 127 0.0 7.72 0.0 0.0 06/27/2021 16:16:16 0 137 0.0 7.71 0.0 0.0 06/27/2021 16:16:36 -2 126 0.0 7.72 0.0 0.0 06/27/2021 16:16:56 3 136 0.0 7.72 0.0 0.0 06/27/2021 16:17:16 -2 122 0.0 7.72 0.0 0.0 06/27/2021 16:17:36 2 142 0.0 7.71 0.0 0.0 06/27/2021 16:17:56 -0 123 0.0 7.71 0.0 0.0 06/27/2021 16:18:16 -0 133 0.0 7.71 0.0 0.0 06/27/2021 16:18:36 -3 129 0.0 7.71 0.0 0.0 06/27/2021 16:18:56 3 137 0.0 7.71 0.0 0.0 06/27/2021 16:19:16 -5 124 0.0 7.71 0.0 0.0 06/27/2021 16:19:36 3 137 0.0 7.71 0.0 0.0 06/27/2021 16:19:56 -2 123 0.0 7.71 0.0 0.0 06/27/2021 16:20:16 3 136 0.0 7.72 0.0 0.0 06/27/2021 16:20:36 -3 126 0.0 7.71 0.0 0.0 06/27/2021 16:20:56 0 133 0.0 7.72 0.0 0.0 06/27/2021 16:21:16 -0 129 0.0 7.71 0.0 0.0 06/27/2021 16:21:36 3 135 0.0 7.71 0.0 0.0 06/27/2021 16:21:56 -1 125 0.0 7.71 0.0 0.0 06/27/2021 16:22:16 2 134 0.0 7.71 0.0 0.0 06/27/2021 16:22:36 -1 123 0.0 7.71 0.0 0.0 06/27/2021 16:22:56 5 135 0.0 7.71 0.0 0.0 06/27/2021 16:23:16 -0 126 0.0 7.72 0.0 0.0 06/27/2021 16:23:36 3 136 0.0 7.71 0.0 0.0 06/27/2021 16:23:56 -2 124 0.0 7.71 0.0 0.0 06/27/2021 16:24:16 2 134 0.0 7.71 0.0 0.0 06/27/2021 16:24:36 -4 123 0.0 7.71 0.0 0.0 06/27/2021 16:24:56 2 135 0.0 7.71 0.0 0.0 06/27/2021 16:25:16 1 127 0.0 7.71 0.0 0.0 06/27/2021 16:25:36 3 133 0.0 7.71 0.0 0.0 06/27/2021 16:25:56 -1 129 0.0 7.71 0.0 0.0 06/27/2021 16:26:16 1 136 0.0 7.71 0.0 0.0 06/27/2021 16:26:36 2 135 0.0 7.71 0.0 0.0 06/27/2021 16:26:56 3 138 0.0 7.71 0.0 0.0 Page 30 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 16:27:36 4 137 0.0 7.71 0.0 0.0 06/27/2021 16:27:56 -3 123 0.0 7.71 0.0 0.0 06/27/2021 16:28:16 2 135 0.0 7.71 0.0 0.0 06/27/2021 16:28:36 -3 118 0.0 7.71 0.0 0.0 06/27/2021 16:28:56 7 136 0.0 7.71 0.0 0.0 06/27/2021 16:29:16 -4 113 0.0 7.71 0.0 0.0 06/27/2021 16:29:36 3 131 0.0 7.71 0.0 0.0 06/27/2021 16:29:56 1 119 0.0 7.71 0.0 0.0 06/27/2021 16:30:16 1 136 0.0 7.71 0.0 0.0 06/27/2021 16:30:36 -3 118 0.0 7.71 0.0 0.0 06/27/2021 16:30:56 2 143 0.0 7.71 0.0 0.0 06/27/2021 16:31:16 -1 119 0.0 7.71 0.0 0.0 06/27/2021 16:31:36 -5 112 0.0 7.71 0.0 0.0 06/27/2021 16:31:56 4 131 0.0 7.71 0.0 0.0 06/27/2021 16:32:16 -2 119 0.0 7.71 0.0 0.0 06/27/2021 16:32:36 3 135 0.0 7.71 0.0 0.0 06/27/2021 16:32:56 -6 120 0.0 7.72 0.0 0.0 06/27/2021 16:33:16 2 135 0.0 7.71 0.0 0.0 06/27/2021 16:33:36 -3 126 0.0 7.71 0.0 0.0 06/27/2021 16:33:56 2 140 0.0 7.71 0.0 0.0 06/27/2021 16:34:16 1 128 0.0 7.71 0.0 0.0 06/27/2021 16:34:36 2 140 0.0 7.71 0.0 0.0 06/27/2021 16:34:56 1 129 0.0 7.71 0.0 0.0 06/27/2021 16:35:16 4 139 0.0 7.71 0.0 0.0 06/27/2021 16:35:36 -1 123 0.0 7.71 0.0 0.0 06/27/2021 16:35:56 -0 140 0.0 7.71 0.0 0.0 06/27/2021 16:36:16 1 148 0.0 7.71 0.0 0.0 06/27/2021 16:36:36 1 131 0.0 7.71 0.0 0.0 06/27/2021 16:36:56 -6 110 0.0 7.71 0.0 0.0 06/27/2021 16:37:16 1 132 0.0 7.71 0.0 0.0 06/27/2021 16:37:36 -1 116 0.0 7.71 0.0 0.0 06/27/2021 16:37:56 3 136 0.0 7.71 0.0 0.0 06/27/2021 16:38:16 -5 116 0.0 7.71 0.0 0.0 06/27/2021 16:38:36 3 128 0.0 7.71 0.0 0.0 06/27/2021 16:38:56 -2 123 0.0 7.71 0.0 0.0 06/27/2021 16:39:16 -3 115 0.0 7.71 0.0 0.0 06/27/2021 16:39:36 4 136 0.0 7.71 0.0 0.0 06/27/2021 16:39:56 -3 118 0.0 7.71 0.0 0.0 06/27/2021 16:40:16 1 141 0.0 7.71 0.0 0.0 06/27/2021 16:40:36 -1 119 0.0 7.71 0.0 0.0 06/27/2021 16:40:56 1 134 0.0 7.71 0.0 0.0 06/27/2021 16:41:16 -0 128 0.0 7.71 0.0 0.0 06/27/2021 16:41:36 3 137 0.0 7.71 0.0 0.0 06/27/2021 16:41:56 -0 131 0.0 7.71 0.0 0.0 06/27/2021 16:42:16 4 134 0.0 7.71 0.0 0.0 06/27/2021 16:42:36 -0 132 0.0 7.71 0.0 0.0 06/27/2021 16:42:56 4 141 0.0 7.71 0.0 0.0 06/27/2021 16:43:16 2 142 0.0 7.71 0.0 0.0 06/27/2021 16:43:36 3 134 0.0 7.71 0.0 0.0 06/27/2021 16:43:56 -1 114 0.0 7.71 0.0 0.0 06/27/2021 16:44:16 4 135 0.0 7.71 0.0 0.0 06/27/2021 16:44:36 -3 121 0.0 7.71 0.0 0.0 06/27/2021 16:44:56 -2 128 0.0 7.71 0.0 0.0 06/27/2021 16:45:16 -3 114 0.0 7.71 0.0 0.0 Page 31 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 16:45:56 1 138 0.0 7.71 0.0 0.0 06/27/2021 16:46:16 2 135 0.0 7.71 0.0 0.0 06/27/2021 16:46:36 -0 129 0.0 7.71 0.0 0.0 06/27/2021 16:46:56 -5 116 0.0 7.71 0.0 0.0 06/27/2021 16:47:16 3 130 0.0 7.71 0.0 0.0 06/27/2021 16:47:36 -3 125 0.0 7.72 0.0 0.0 06/27/2021 16:47:56 -1 124 0.0 7.71 0.0 0.0 06/27/2021 16:48:16 -1 114 0.0 7.71 0.0 0.0 06/27/2021 16:48:36 -2 123 0.0 7.71 0.0 0.0 06/27/2021 16:48:56 -7 100 0.0 7.71 0.0 0.0 06/27/2021 16:49:16 -5 99 0.0 7.71 0.0 0.0 06/27/2021 16:49:36 -6 100 0.0 7.71 0.0 0.0 06/27/2021 16:49:56 -4 107 0.0 7.71 0.0 0.0 06/27/2021 16:50:16 -12 84 0.0 7.71 0.0 0.0 06/27/2021 16:50:36 -5 96 0.0 7.71 0.0 0.0 06/27/2021 16:50:56 -7 108 0.0 7.71 0.0 0.0 06/27/2021 16:51:16 -3 114 0.0 7.72 0.0 0.0 06/27/2021 16:51:36 -3 118 0.0 7.72 0.0 0.0 06/27/2021 16:51:56 2 138 0.0 7.71 0.0 0.0 06/27/2021 16:52:16 -7 90 0.0 7.71 0.0 0.0 06/27/2021 16:52:36 -4 113 0.0 7.71 0.0 0.0 06/27/2021 16:52:56 3 145 0.0 7.71 0.0 0.0 06/27/2021 16:53:16 -3 112 0.0 7.70 0.0 0.0 06/27/2021 16:53:36 -12 80 0.0 7.72 0.0 0.0 06/27/2021 16:53:56 -1 121 0.0 7.71 0.0 0.0 06/27/2021 16:54:16 -6 116 0.0 7.71 0.0 0.0 06/27/2021 16:54:36 -7 97 0.0 7.71 0.0 0.0 06/27/2021 16:54:56 -1 112 0.0 7.71 0.0 0.0 06/27/2021 16:55:16 -7 109 0.0 7.71 0.0 0.0 06/27/2021 16:55:36 -12 78 0.0 7.71 0.0 0.0 06/27/2021 16:55:56 -9 107 0.0 7.71 0.0 0.0 06/27/2021 16:56:16 -9 101 0.0 7.72 0.0 0.0 06/27/2021 16:56:36 3 136 0.0 7.71 0.0 0.0 06/27/2021 16:56:56 -4 113 0.0 7.72 0.0 0.0 06/27/2021 16:57:16 -5 123 0.0 7.71 0.0 0.0 06/27/2021 16:57:36 -5 134 0.0 7.72 0.0 0.0 06/27/2021 16:57:56 -4 121 0.0 7.71 0.0 0.0 06/27/2021 16:58:16 -3 139 0.0 7.72 0.0 0.0 06/27/2021 16:58:36 -6 111 0.0 7.71 0.0 0.0 06/27/2021 16:58:56 -8 114 0.0 7.71 0.0 0.0 06/27/2021 16:59:16 -5 138 0.0 7.71 0.0 0.0 06/27/2021 16:59:36 -5 121 0.0 7.72 0.0 0.0 06/27/2021 16:59:56 -5 137 0.0 7.71 0.0 0.0 06/27/2021 17:00:16 -7 132 0.0 7.72 0.0 0.0 06/27/2021 17:00:36 -8 127 0.0 7.72 0.0 0.0 06/27/2021 17:00:56 -5 134 0.0 7.71 0.0 0.0 06/27/2021 17:01:16 -7 111 0.0 7.72 0.0 0.0 06/27/2021 17:01:36 -6 134 0.0 7.71 0.0 0.0 06/27/2021 17:01:56 -5 129 0.0 7.71 0.0 0.0 06/27/2021 17:02:16 -7 118 0.0 7.72 0.0 0.0 06/27/2021 17:02:36 -5 136 0.0 7.71 0.0 0.0 06/27/2021 17:02:56 -6 115 0.0 7.72 0.0 0.0 06/27/2021 17:03:36 -5 127 0.0 7.72 0.0 0.0 06/27/2021 17:03:56 -5 124 0.0 7.72 0.0 0.0 Page 32 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 17:04:16 -4 131 0.0 7.72 0.0 0.0 06/27/2021 17:04:36 -8 111 0.0 7.72 0.0 0.0 06/27/2021 17:04:56 -6 112 0.0 7.72 0.0 0.0 06/27/2021 17:05:16 -7 109 0.0 7.72 0.0 0.0 06/27/2021 17:05:36 -9 110 0.0 7.71 0.0 0.0 06/27/2021 17:05:56 -5 129 0.0 7.71 0.0 0.0 06/27/2021 17:06:16 -10 105 0.0 7.71 0.0 0.0 06/27/2021 17:06:36 -9 133 0.0 7.72 0.0 0.0 06/27/2021 17:06:56 -6 120 0.0 7.71 0.0 0.0 06/27/2021 17:07:16 -10 108 0.0 7.71 0.0 0.0 06/27/2021 17:07:36 -8 115 0.0 7.72 0.0 0.0 06/27/2021 17:07:56 -3 130 0.0 7.72 0.0 0.0 06/27/2021 17:08:16 -8 117 0.0 7.71 0.0 0.0 06/27/2021 17:08:36 -8 132 0.0 7.72 0.0 0.0 06/27/2021 17:08:56 -11 104 0.0 7.71 0.0 0.0 06/27/2021 17:09:16 -8 109 0.0 7.71 0.0 0.0 06/27/2021 17:09:36 -3 134 0.0 7.71 0.0 0.0 06/27/2021 17:09:56 -6 120 0.0 7.71 0.0 0.0 06/27/2021 17:10:16 -6 136 0.0 7.71 0.0 0.0 06/27/2021 17:10:36 -5 127 0.0 7.71 0.0 0.0 06/27/2021 17:10:56 -8 106 0.0 7.71 0.0 0.0 06/27/2021 17:11:16 -5 128 0.0 7.70 0.0 0.0 06/27/2021 17:11:36 -6 118 0.0 7.71 0.0 0.0 06/27/2021 17:11:56 -5 132 0.0 7.70 0.0 0.0 06/27/2021 17:12:16 -8 125 0.0 7.71 0.0 0.0 06/27/2021 17:12:36 -7 124 0.0 7.71 0.0 0.0 06/27/2021 17:12:56 -4 137 0.0 7.70 0.0 0.0 06/27/2021 17:13:16 -7 122 0.0 7.70 0.0 0.0 06/27/2021 17:13:16 -5 119 0.0 7.70 0.0 0.0 06/27/2021 17:13:36 -6 138 0.0 7.70 0.0 0.0 06/27/2021 17:13:56 -7 133 0.0 7.70 0.0 0.0 06/27/2021 17:14:16 -3 128 0.0 7.70 0.0 0.0 06/27/2021 17:14:36 -4 132 0.0 7.70 0.0 0.0 06/27/2021 17:14:56 -7 119 0.0 7.69 0.0 0.0 06/27/2021 17:15:16 -4 139 0.0 7.69 0.0 0.0 06/27/2021 17:15:36 -3 134 0.0 7.69 0.0 0.0 06/27/2021 17:15:56 -9 127 0.0 7.70 0.0 0.0 06/27/2021 17:16:16 -4 135 0.0 7.69 0.0 0.0 06/27/2021 17:16:36 -7 117 0.0 7.69 0.0 0.0 06/27/2021 17:16:56 -3 144 0.0 7.69 0.0 0.0 06/27/2021 17:17:16 -6 134 0.0 7.69 0.0 0.0 06/27/2021 17:17:36 -5 126 0.0 7.68 0.0 0.0 06/27/2021 17:17:56 -3 138 0.0 7.68 0.0 0.0 06/27/2021 17:18:16 -6 123 0.0 7.69 0.0 0.0 06/27/2021 17:18:36 -5 125 0.0 7.68 0.0 0.0 06/27/2021 17:18:56 -2 138 0.0 7.68 0.0 0.0 06/27/2021 17:19:16 -6 124 0.0 7.68 0.0 0.0 06/27/2021 17:19:36 -5 143 0.0 7.68 0.0 0.0 06/27/2021 17:19:56 -5 114 0.0 7.68 0.0 0.0 06/27/2021 17:20:16 -7 120 0.0 7.68 0.0 0.0 06/27/2021 17:20:36 -4 137 0.0 7.67 0.0 0.0 06/27/2021 17:20:56 -5 122 0.0 7.68 0.0 0.0 06/27/2021 17:21:16 -3 137 0.0 7.67 0.0 0.0 06/27/2021 17:21:36 -6 118 0.0 7.67 0.0 0.0 Page 33 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 17:22:16 -2 126 0.0 7.67 0.0 0.0 06/27/2021 17:22:36 -4 118 0.0 7.67 0.0 0.0 06/27/2021 17:22:56 -3 133 0.0 7.66 0.0 0.0 06/27/2021 17:23:16 -5 119 0.0 7.66 0.0 0.0 06/27/2021 17:23:36 -5 126 0.0 7.66 0.0 0.0 06/27/2021 17:23:56 -7 125 0.0 7.65 0.0 0.0 06/27/2021 17:24:16 -8 117 0.0 7.65 0.0 0.0 06/27/2021 17:24:36 -7 115 0.0 7.65 0.0 0.0 06/27/2021 17:24:56 -8 109 0.0 7.65 0.0 0.0 06/27/2021 17:25:16 -7 108 0.0 7.64 0.0 0.0 06/27/2021 17:25:36 -12 100 0.0 7.64 0.0 0.0 06/27/2021 17:25:56 -5 108 0.0 7.64 0.0 0.0 06/27/2021 17:26:16 -7 108 0.0 7.64 0.0 0.0 06/27/2021 17:26:36 -10 100 0.0 7.63 0.0 0.0 06/27/2021 17:26:56 -11 131 0.0 7.63 0.0 0.0 06/27/2021 17:27:16 -9 114 0.0 7.63 0.0 0.0 06/27/2021 17:27:36 -9 101 0.0 7.63 0.0 0.0 06/27/2021 17:27:56 -7 115 0.0 7.62 0.0 0.0 06/27/2021 17:28:16 -8 122 0.0 7.62 0.0 0.0 06/27/2021 17:28:36 -8 114 0.0 7.61 0.0 0.0 06/27/2021 17:28:56 -8 124 0.0 7.61 0.0 0.0 06/27/2021 17:29:16 -10 108 0.0 7.61 0.0 0.0 06/27/2021 17:29:36 -11 102 0.0 7.61 0.0 0.0 06/27/2021 17:29:56 -7 124 0.0 7.60 0.0 0.0 06/27/2021 17:30:16 -6 130 0.0 7.60 0.0 0.0 06/27/2021 17:30:36 -9 102 0.0 7.60 0.0 0.0 06/27/2021 17:30:56 -9 109 0.0 7.59 0.0 0.0 06/27/2021 17:31:16 -5 128 0.0 7.59 0.0 0.0 06/27/2021 17:31:36 -9 109 0.0 7.59 0.0 0.0 06/27/2021 17:31:56 -10 109 0.0 7.58 0.0 0.0 06/27/2021 17:32:16 -4 138 0.0 7.57 0.0 0.0 06/27/2021 17:32:36 -4 150 0.0 7.57 0.0 0.0 06/27/2021 17:32:56 -5 122 0.0 7.57 0.0 0.0 06/27/2021 17:33:16 -7 125 0.0 7.57 0.0 0.0 06/27/2021 17:33:36 -5 145 0.0 7.56 0.0 0.0 06/27/2021 17:33:56 -8 114 0.0 7.55 0.0 0.0 06/27/2021 17:34:16 -2 141 0.0 7.56 0.0 0.0 06/27/2021 17:34:36 -9 102 0.0 7.55 0.0 0.0 06/27/2021 17:34:56 -7 120 0.0 7.55 0.0 0.0 06/27/2021 17:35:16 -7 119 0.0 7.55 0.0 0.0 06/27/2021 17:35:36 -2 144 0.0 7.54 0.0 0.0 06/27/2021 17:35:56 -6 114 0.0 7.53 0.0 0.0 06/27/2021 17:36:16 -4 133 0.0 7.53 0.0 0.0 06/27/2021 17:36:36 -5 131 0.0 7.52 0.0 0.0 06/27/2021 17:36:56 -8 120 0.0 7.53 0.0 0.0 06/27/2021 17:37:16 -6 130 0.0 7.52 0.0 0.0 06/27/2021 17:37:36 -7 132 0.0 7.52 0.0 0.0 06/27/2021 17:37:56 -7 117 0.0 7.51 0.0 0.0 06/27/2021 17:38:16 -6 137 0.0 7.51 0.0 0.0 06/27/2021 17:38:36 -9 121 0.0 7.51 0.0 0.0 06/27/2021 17:38:56 -11 108 0.0 7.50 0.0 0.0 06/27/2021 17:39:16 -6 128 0.0 7.50 0.0 0.0 06/27/2021 17:39:36 -5 108 0.0 7.50 0.0 0.0 06/27/2021 17:39:56 -9 104 0.0 7.50 0.0 0.0 Page 34 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 17:40:36 -11 104 0.0 7.49 0.0 0.0 06/27/2021 17:40:56 -6 135 0.0 7.49 0.0 0.0 06/27/2021 17:41:16 -6 130 0.0 7.48 0.0 0.0 06/27/2021 17:41:36 -5 118 0.0 7.49 0.0 0.0 06/27/2021 17:41:56 -5 131 0.0 7.48 0.0 0.0 06/27/2021 17:42:16 -6 127 0.0 7.48 0.0 0.0 06/27/2021 17:42:36 -9 109 0.0 7.47 0.0 0.0 06/27/2021 17:42:56 -3 132 0.0 7.47 0.0 0.0 06/27/2021 17:43:16 -7 116 0.0 7.47 0.0 0.0 06/27/2021 17:43:36 -6 137 0.0 7.47 0.0 0.0 06/27/2021 17:43:56 -2 135 0.0 7.46 0.0 0.0 06/27/2021 17:44:16 -4 126 0.0 7.46 0.0 0.0 06/27/2021 17:44:36 -7 129 0.0 7.46 0.0 0.0 06/27/2021 17:44:56 -7 121 0.0 7.46 0.0 0.0 06/27/2021 17:45:16 -6 136 0.0 7.46 0.0 0.0 06/27/2021 17:45:36 -5 131 0.0 7.45 0.0 0.0 06/27/2021 17:45:56 -7 126 0.0 7.45 0.0 0.0 06/27/2021 17:46:16 -6 131 0.0 7.45 0.0 0.0 06/27/2021 17:46:36 -6 119 0.0 7.45 0.0 0.0 06/27/2021 17:46:56 -5 137 0.0 7.44 0.0 0.0 06/27/2021 17:47:16 -6 129 0.0 7.44 0.0 0.0 06/27/2021 17:47:36 -7 118 0.0 7.44 0.0 0.0 06/27/2021 17:47:56 -4 134 0.0 7.44 0.0 0.0 06/27/2021 17:48:16 -7 117 0.0 7.43 0.0 0.0 06/27/2021 17:48:36 -4 138 0.0 7.43 0.0 0.0 06/27/2021 17:48:56 -7 114 0.0 7.43 0.0 0.0 06/27/2021 17:49:16 -4 137 0.0 7.42 0.0 0.0 06/27/2021 17:49:36 -6 134 0.0 7.42 0.0 0.0 06/27/2021 17:49:56 -7 124 0.0 7.42 0.0 0.0 06/27/2021 17:50:16 -3 141 0.0 7.42 0.0 0.0 06/27/2021 17:50:36 -7 118 0.0 7.41 0.0 0.0 06/27/2021 17:50:56 -3 138 0.0 7.41 0.0 0.0 06/27/2021 17:51:16 -5 133 0.0 7.41 0.0 0.0 06/27/2021 17:51:36 -7 114 0.0 7.41 0.0 0.0 06/27/2021 17:51:56 -6 133 0.0 7.40 0.0 0.0 06/27/2021 17:52:16 -5 136 0.0 7.41 0.0 0.0 06/27/2021 17:52:36 -5 133 0.0 7.40 0.0 0.0 06/27/2021 17:52:56 -8 121 0.0 7.40 0.0 0.0 06/27/2021 17:53:16 -4 141 0.0 7.39 0.0 0.0 06/27/2021 17:53:36 -7 112 0.0 7.40 0.0 0.0 06/27/2021 17:53:56 -4 136 0.0 7.39 0.0 0.0 06/27/2021 17:54:16 -6 120 0.0 7.40 0.0 0.0 06/27/2021 17:54:36 -7 126 0.0 7.40 0.0 0.0 06/27/2021 17:54:56 -4 132 0.0 7.39 0.0 0.0 06/27/2021 17:55:16 -6 124 0.0 7.39 0.0 0.0 06/27/2021 17:55:36 -6 134 0.0 7.39 0.0 0.0 06/27/2021 17:55:56 -5 120 0.0 7.38 0.0 0.0 06/27/2021 17:56:16 -3 138 0.0 7.39 0.0 0.0 06/27/2021 17:56:36 -6 122 0.0 7.38 0.0 0.0 06/27/2021 17:56:56 -3 131 0.0 7.38 0.0 0.0 06/27/2021 17:57:16 -3 131 0.0 7.38 0.0 0.0 06/27/2021 17:57:36 -7 114 0.0 7.38 0.0 0.0 06/27/2021 17:57:56 -4 134 0.0 7.37 0.0 0.0 06/27/2021 17:58:16 -7 122 0.0 7.37 0.0 0.0 Page 35 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 17:58:56 -8 116 0.0 7.37 0.0 0.0 06/27/2021 17:59:16 -3 134 0.0 7.37 0.0 0.0 06/27/2021 17:59:36 -8 123 0.0 7.37 0.0 0.0 06/27/2021 17:59:56 -8 114 0.0 7.37 0.0 0.0 06/27/2021 18:00:16 -6 144 0.0 7.37 0.0 0.0 06/27/2021 18:00:36 -7 121 0.0 7.36 0.0 0.0 06/27/2021 18:00:56 -4 138 0.0 7.36 0.0 0.0 06/27/2021 18:01:16 -6 116 0.0 7.37 0.0 0.0 06/27/2021 18:01:36 -4 138 0.0 7.36 0.0 0.0 06/27/2021 18:01:56 -3 131 0.0 7.37 0.0 0.0 06/27/2021 18:02:16 -5 128 0.0 7.36 0.0 0.0 06/27/2021 18:02:36 -7 134 0.0 7.36 0.0 0.0 06/27/2021 18:02:56 -5 119 0.0 7.36 0.0 0.0 06/27/2021 18:03:16 -4 132 0.0 7.36 0.0 0.0 06/27/2021 18:03:36 -7 116 0.0 7.35 0.0 0.0 06/27/2021 18:03:56 -3 138 0.0 7.35 0.0 0.0 06/27/2021 18:04:16 -4 130 0.0 7.35 0.0 0.0 06/27/2021 18:04:36 -7 122 0.0 7.35 0.0 0.0 06/27/2021 18:04:56 -4 136 0.0 7.35 0.0 0.0 06/27/2021 18:05:16 -6 120 0.0 7.35 0.0 0.0 06/27/2021 18:05:36 -3 132 0.0 7.35 0.0 0.0 06/27/2021 18:05:56 -4 126 0.0 7.35 0.0 0.0 06/27/2021 18:06:16 -9 112 0.0 7.35 0.0 0.0 06/27/2021 18:06:36 -2 138 0.0 7.35 0.0 0.0 06/27/2021 18:06:56 -7 123 0.0 7.35 0.0 0.0 06/27/2021 18:07:16 -5 132 0.0 7.35 0.0 0.0 06/27/2021 18:07:36 -7 118 0.0 7.35 0.0 0.0 06/27/2021 18:07:56 -4 133 0.0 7.35 0.0 0.0 06/27/2021 18:08:16 -4 129 0.0 7.35 0.0 0.0 06/27/2021 18:08:36 -6 135 0.0 7.35 0.0 0.0 06/27/2021 18:08:56 -5 141 0.0 7.35 0.0 0.0 06/27/2021 18:09:16 -7 122 0.0 7.35 0.0 0.0 06/27/2021 18:09:36 -4 141 0.0 7.34 0.0 0.0 06/27/2021 18:09:56 -6 114 0.0 7.34 0.0 0.0 06/27/2021 18:10:16 -7 126 0.0 7.34 0.0 0.0 06/27/2021 18:10:36 -5 135 0.0 7.34 0.0 0.0 06/27/2021 18:10:56 -7 126 0.0 7.34 0.0 0.0 06/27/2021 18:11:16 -1 137 0.0 7.34 0.0 0.0 06/27/2021 18:11:36 -7 119 0.0 7.35 0.0 0.0 06/27/2021 18:11:56 -6 139 0.0 7.33 0.0 0.0 06/27/2021 18:12:16 -4 130 0.0 7.34 0.0 0.0 06/27/2021 18:12:36 -7 115 0.0 7.34 0.0 0.0 06/27/2021 18:12:56 -3 140 0.0 7.34 0.0 0.0 06/27/2021 18:13:16 -6 127 0.0 7.34 0.0 0.0 06/27/2021 18:13:36 -5 142 0.0 7.34 0.0 0.0 06/27/2021 18:13:56 -9 119 0.0 7.34 0.0 0.0 06/27/2021 18:14:16 -7 142 0.0 7.33 0.0 0.0 06/27/2021 18:14:36 -5 134 0.0 7.34 0.0 0.0 06/27/2021 18:14:56 -7 127 0.0 7.34 0.0 0.0 06/27/2021 18:15:16 -5 139 0.0 7.34 0.0 0.0 06/27/2021 18:15:36 -4 124 0.0 7.34 0.0 0.0 06/27/2021 18:15:56 -3 138 0.0 7.34 0.0 0.0 06/27/2021 18:16:16 -9 110 0.0 7.34 0.0 0.0 06/27/2021 18:16:36 -8 120 0.0 7.34 0.0 0.0 Page 36 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 18:17:16 -4 130 0.0 7.34 0.0 0.0 06/27/2021 18:17:36 -5 139 0.0 7.34 0.0 0.0 06/27/2021 18:17:56 -7 120 0.0 7.34 0.0 0.0 06/27/2021 18:18:16 -3 143 0.0 7.34 0.0 0.0 06/27/2021 18:18:36 -7 136 0.0 7.34 0.0 0.0 06/27/2021 18:18:56 -8 120 0.0 7.34 0.0 0.0 06/27/2021 18:19:16 -5 138 0.0 7.33 0.0 0.0 06/27/2021 18:19:36 -5 123 0.0 7.34 0.0 0.0 06/27/2021 18:19:56 -4 142 0.0 7.34 0.0 0.0 06/27/2021 18:20:16 -6 126 0.0 7.34 0.0 0.0 06/27/2021 18:20:36 -6 142 0.0 7.34 0.0 0.0 06/27/2021 18:20:56 -5 132 0.0 7.34 0.0 0.0 06/27/2021 18:21:16 -5 128 0.0 7.34 0.0 0.0 06/27/2021 18:21:36 -4 136 0.0 7.34 0.0 0.0 06/27/2021 18:21:56 -7 125 0.0 7.34 0.0 0.0 06/27/2021 18:22:16 -5 146 0.0 7.33 0.0 0.0 06/27/2021 18:22:36 -7 141 0.0 7.33 0.0 0.0 06/27/2021 18:22:56 -11 120 0.0 7.34 0.0 0.0 06/27/2021 18:23:16 -5 141 0.0 7.34 0.0 0.0 06/27/2021 18:23:36 -4 129 0.0 7.34 0.0 0.0 06/27/2021 18:23:56 -3 140 0.0 7.33 0.0 0.0 06/27/2021 18:24:16 -7 122 0.0 7.33 0.0 0.0 06/27/2021 18:24:36 -3 140 0.0 7.34 0.0 0.0 06/27/2021 18:24:56 -1 141 0.0 7.34 0.0 0.0 06/27/2021 18:25:16 -6 121 0.0 7.34 0.0 0.0 06/27/2021 18:25:36 -3 146 0.0 7.34 0.0 0.0 06/27/2021 18:25:56 -4 123 0.0 7.34 0.0 0.0 06/27/2021 18:26:16 -3 137 0.0 7.34 0.0 0.0 06/27/2021 18:26:36 -5 121 0.0 7.33 0.0 0.0 06/27/2021 18:26:56 -3 141 0.0 7.33 0.0 0.0 06/27/2021 18:27:16 -6 141 0.0 7.34 0.0 0.0 06/27/2021 18:27:36 -4 133 0.0 7.34 0.0 0.0 06/27/2021 18:27:56 -3 141 0.0 7.33 0.0 0.0 06/27/2021 18:28:16 -7 126 0.0 7.34 0.0 0.0 06/27/2021 18:28:36 -2 143 0.0 7.34 0.0 0.0 06/27/2021 18:28:56 -10 113 0.0 7.34 0.0 0.0 06/27/2021 18:29:16 -5 117 0.0 7.34 0.0 0.0 06/27/2021 18:29:36 -5 139 0.0 7.33 0.0 0.0 06/27/2021 18:29:56 -5 127 0.0 7.34 0.0 0.0 06/27/2021 18:30:16 -5 144 0.0 7.34 0.0 0.0 06/27/2021 18:30:36 -7 122 0.0 7.34 0.0 0.0 06/27/2021 18:30:56 -5 141 0.0 7.34 0.0 0.0 06/27/2021 18:31:16 -5 128 0.0 7.34 0.0 0.0 06/27/2021 18:31:36 -8 119 0.0 7.34 0.0 0.0 06/27/2021 18:31:56 -6 143 0.0 7.34 0.0 0.0 06/27/2021 18:32:16 -3 125 0.0 7.34 0.0 0.0 06/27/2021 18:32:36 -5 141 0.0 7.33 0.0 0.0 06/27/2021 18:32:56 -6 118 0.0 7.34 0.0 0.0 06/27/2021 18:33:16 -3 143 0.0 7.34 0.0 0.0 06/27/2021 18:33:36 -7 137 0.0 7.34 0.0 0.0 06/27/2021 18:33:56 -9 132 0.0 7.34 0.0 0.0 06/27/2021 18:34:16 -5 139 0.0 7.34 0.0 0.0 06/27/2021 18:34:36 -6 128 0.0 7.34 0.0 0.0 06/27/2021 18:34:56 -2 149 0.0 7.34 0.0 0.0 Page 37 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 18:35:36 -5 138 0.0 7.34 0.0 0.0 06/27/2021 18:35:56 -5 140 0.0 7.34 0.0 0.0 06/27/2021 18:36:16 -4 127 0.0 7.34 0.0 0.0 06/27/2021 18:36:36 -5 141 0.0 7.34 0.0 0.0 06/27/2021 18:36:56 -4 121 0.0 7.34 0.0 0.0 06/27/2021 18:37:16 -4 140 0.0 7.34 0.0 0.0 06/27/2021 18:37:36 -7 111 0.0 7.34 0.0 0.0 06/27/2021 18:37:56 -5 120 0.0 7.34 0.0 0.0 06/27/2021 18:38:16 -6 143 0.0 7.34 0.0 0.0 06/27/2021 18:38:36 -4 134 0.0 7.34 0.0 0.0 06/27/2021 18:38:56 -4 140 0.0 7.34 0.0 0.0 06/27/2021 18:39:16 -5 123 0.0 7.34 0.0 0.0 06/27/2021 18:39:36 -5 138 0.0 7.34 0.0 0.0 06/27/2021 18:39:56 -5 118 0.0 7.34 0.0 0.0 06/27/2021 18:40:16 -2 134 0.0 7.34 0.0 0.0 06/27/2021 18:40:36 -6 128 0.0 7.34 0.0 0.0 06/27/2021 18:40:56 -7 128 0.0 7.34 0.0 0.0 06/27/2021 18:41:16 -9 117 0.0 7.34 0.0 0.0 06/27/2021 18:41:36 -12 104 0.0 7.34 0.0 0.0 06/27/2021 18:41:56 -11 99 0.0 7.34 0.0 0.0 06/27/2021 18:42:16 -5 138 0.0 7.34 0.0 0.0 06/27/2021 18:42:36 -7 99 0.0 7.34 0.0 0.0 06/27/2021 18:42:56 -10 100 0.0 7.34 0.0 0.0 06/27/2021 18:43:16 -10 97 0.0 7.34 0.0 0.0 06/27/2021 18:43:36 -9 101 0.0 7.34 0.0 0.0 06/27/2021 18:43:56 -11 91 0.0 7.34 0.0 0.0 06/27/2021 18:44:16 -11 109 0.0 7.34 0.0 0.0 06/27/2021 18:44:36 -12 100 0.0 7.34 0.0 0.0 06/27/2021 18:44:56 -12 94 0.0 7.34 0.0 0.0 06/27/2021 18:45:16 -9 92 0.0 7.34 0.0 0.0 06/27/2021 18:45:36 -12 91 0.0 7.33 0.0 0.0 06/27/2021 18:45:56 -12 93 0.0 7.34 0.0 0.0 06/27/2021 18:46:16 -11 94 0.0 7.34 0.0 0.0 06/27/2021 18:46:36 -11 101 0.0 7.34 0.0 0.0 06/27/2021 18:46:56 -11 93 0.0 7.34 0.0 0.0 06/27/2021 18:47:16 -13 93 0.0 7.34 0.0 0.0 06/27/2021 18:47:36 -13 97 0.0 7.33 0.0 0.0 06/27/2021 18:47:56 -10 95 0.0 7.33 0.0 0.0 06/27/2021 18:48:16 -10 89 0.0 7.34 0.0 0.0 06/27/2021 18:48:36 -8 99 0.0 7.34 0.0 0.0 06/27/2021 18:48:56 -13 94 0.0 7.34 0.0 0.0 06/27/2021 18:49:16 -12 93 0.0 7.33 0.0 0.0 06/27/2021 18:49:36 -11 96 0.0 7.33 0.0 0.0 06/27/2021 18:49:56 -12 95 0.0 7.33 0.0 0.0 06/27/2021 18:50:16 -12 90 0.0 7.34 0.0 0.0 06/27/2021 18:50:36 -12 96 0.0 7.34 0.0 0.0 06/27/2021 18:50:56 -11 94 0.0 7.34 0.0 0.0 06/27/2021 18:51:16 -11 95 0.0 7.33 0.0 0.0 06/27/2021 18:51:36 -13 88 0.0 7.33 0.0 0.0 06/27/2021 18:51:56 -11 96 0.0 7.33 0.0 0.0 06/27/2021 18:52:16 -13 92 0.0 7.33 0.0 0.0 06/27/2021 18:52:36 -13 95 0.0 7.33 0.0 0.0 06/27/2021 18:52:56 -10 90 0.0 7.34 0.0 0.0 06/27/2021 18:53:16 -13 92 0.0 7.33 0.0 0.0 Page 38 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 18:53:56 -12 108 0.0 7.33 0.0 0.0 06/27/2021 18:54:16 -14 94 0.0 7.33 0.0 0.0 06/27/2021 18:54:36 -13 96 0.0 7.33 0.0 0.0 06/27/2021 18:54:56 -13 96 0.0 7.33 0.0 0.0 06/27/2021 18:55:16 -11 90 0.0 7.33 0.0 0.0 06/27/2021 18:55:36 -10 94 0.0 7.33 0.0 0.0 06/27/2021 18:55:56 -12 93 0.0 7.33 0.0 0.0 06/27/2021 18:56:16 -11 92 0.0 7.32 0.0 0.0 06/27/2021 18:56:36 -10 97 0.0 7.32 0.0 0.0 06/27/2021 18:56:56 -10 99 0.0 7.32 0.0 0.0 06/27/2021 18:57:16 -11 97 0.0 7.32 0.0 0.0 06/27/2021 18:57:36 -12 95 0.0 7.32 0.0 0.0 06/27/2021 18:57:56 -12 93 0.0 7.32 0.0 0.0 06/27/2021 18:58:16 -11 94 0.0 7.32 0.0 0.0 06/27/2021 18:58:36 -10 92 0.0 7.32 0.0 0.0 06/27/2021 18:58:56 -12 90 0.0 7.31 0.0 0.0 06/27/2021 18:59:16 -11 95 0.0 7.32 0.0 0.0 06/27/2021 18:59:36 -10 94 0.0 7.32 0.0 0.0 06/27/2021 18:59:56 -15 94 0.0 7.32 0.0 0.0 06/27/2021 19:00:16 -13 96 0.0 7.31 0.0 0.0 06/27/2021 19:00:36 -12 100 0.0 7.32 0.0 0.0 06/27/2021 19:00:56 -9 94 0.0 7.31 0.0 0.0 06/27/2021 19:01:16 -9 97 0.0 7.31 0.0 0.0 06/27/2021 19:01:36 -10 94 0.0 7.31 0.0 0.0 06/27/2021 19:01:56 -11 94 0.0 7.31 0.0 0.0 06/27/2021 19:02:16 -11 92 0.0 7.31 0.0 0.0 06/27/2021 19:02:36 -12 94 0.0 7.31 0.0 0.0 06/27/2021 19:02:56 -12 98 0.0 7.30 0.0 0.0 06/27/2021 19:03:16 -10 92 0.0 7.31 0.0 0.0 06/27/2021 19:03:36 -11 91 0.0 7.30 0.0 0.0 06/27/2021 19:03:56 -9 108 0.0 7.30 0.0 0.0 06/27/2021 19:04:16 -12 96 0.0 7.30 0.0 0.0 06/27/2021 19:04:36 -10 93 0.0 7.30 0.0 0.0 06/27/2021 19:04:56 -11 91 0.0 7.31 0.0 0.0 06/27/2021 19:05:16 -11 94 0.0 7.30 0.0 0.0 06/27/2021 19:05:36 -13 94 0.0 7.30 0.0 0.0 06/27/2021 19:05:56 -12 93 0.0 7.30 0.0 0.0 06/27/2021 19:06:16 -11 96 0.0 7.30 0.0 0.0 06/27/2021 19:06:36 -12 94 0.0 7.29 0.0 0.0 06/27/2021 19:06:56 -5 110 0.0 7.30 0.0 0.0 06/27/2021 19:07:16 -11 94 0.0 7.30 0.0 0.0 06/27/2021 19:07:36 -7 96 0.0 7.30 0.0 0.0 06/27/2021 19:07:56 -7 93 0.0 7.30 0.0 0.0 06/27/2021 19:08:16 -9 92 0.0 7.30 0.0 0.0 06/27/2021 19:08:36 -8 98 0.0 7.30 0.0 0.0 06/27/2021 19:08:56 -9 95 0.0 7.29 0.0 0.0 06/27/2021 19:09:16 -10 92 0.0 7.29 0.0 0.0 06/27/2021 19:09:36 -10 105 0.0 7.29 0.0 0.0 06/27/2021 19:09:56 -11 96 0.0 7.29 0.0 0.0 06/27/2021 19:10:16 -9 104 0.0 7.29 0.0 0.0 06/27/2021 19:10:36 -9 96 0.0 7.29 0.0 0.0 06/27/2021 19:10:56 -7 97 0.0 7.29 0.0 0.0 06/27/2021 19:11:16 -5 156 0.0 7.28 0.0 0.0 06/27/2021 19:11:36 -3 208 0.0 7.28 0.0 0.0 Page 39 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 19:12:16 -1 274 0.0 7.28 0.0 0.0 06/27/2021 19:12:36 -2 279 0.0 7.29 0.0 0.0 06/27/2021 19:12:56 -5 271 0.0 7.28 0.0 0.0 06/27/2021 19:13:16 -4 280 0.0 7.28 0.0 0.0 06/27/2021 19:13:36 -4 270 0.0 7.28 0.0 0.0 06/27/2021 19:13:56 -4 282 0.0 7.27 0.0 0.0 06/27/2021 19:14:16 -7 276 0.0 7.28 0.0 0.0 06/27/2021 19:14:36 -3 304 0.0 7.28 0.0 0.0 06/27/2021 19:14:56 -3 298 0.0 7.27 0.0 0.0 06/27/2021 19:15:16 -2 298 0.0 7.28 0.0 0.0 06/27/2021 19:15:36 -4 300 0.0 7.27 0.0 0.0 06/27/2021 19:15:56 -3 292 0.0 7.27 0.0 0.0 06/27/2021 19:16:16 -3 305 0.0 7.28 0.0 0.0 06/27/2021 19:16:36 -2 290 0.0 7.27 0.0 0.0 06/27/2021 19:16:56 -3 300 0.0 7.27 0.0 0.0 06/27/2021 19:17:16 -7 311 0.0 7.27 0.0 0.0 06/27/2021 19:17:36 -4 315 0.0 7.27 0.0 0.0 06/27/2021 19:17:56 -5 312 0.0 7.27 0.0 0.0 06/27/2021 19:18:16 -4 312 0.0 7.26 0.0 0.0 06/27/2021 19:18:36 -6 311 0.0 7.27 0.0 0.0 06/27/2021 19:18:56 -4 320 0.0 7.26 0.0 0.0 06/27/2021 19:19:16 -4 312 0.0 7.26 0.0 0.0 06/27/2021 19:19:36 -4 318 0.0 7.26 0.0 0.0 06/27/2021 19:19:56 -3 318 0.0 7.26 0.0 0.0 06/27/2021 19:20:16 -6 313 0.0 7.26 0.0 0.0 06/27/2021 19:20:36 -6 316 0.0 7.26 0.0 0.0 06/27/2021 19:20:56 -3 318 0.0 7.26 0.0 0.0 06/27/2021 19:21:16 -6 309 0.0 7.26 0.0 0.0 06/27/2021 19:21:36 -5 341 0.0 7.26 0.0 0.0 06/27/2021 19:21:56 -4 341 0.0 7.25 0.0 0.0 06/27/2021 19:22:16 -5 341 0.0 7.26 0.0 0.0 06/27/2021 19:22:36 -2 369 0.0 7.25 0.0 0.0 06/27/2021 19:22:56 -3 376 0.0 7.25 0.0 0.0 06/27/2021 19:23:16 -9 358 0.0 7.25 0.0 0.0 06/27/2021 19:23:36 -11 290 0.0 7.25 0.0 0.0 06/27/2021 19:23:56 -11 298 0.0 7.25 0.0 0.0 06/27/2021 19:24:16 -5 320 0.0 7.25 0.0 0.0 06/27/2021 19:24:36 -7 302 0.0 7.25 0.0 0.0 06/27/2021 19:24:56 -5 306 0.0 7.25 0.0 0.0 06/27/2021 19:25:16 -7 297 0.0 7.25 0.0 0.0 06/27/2021 19:25:36 -5 308 0.0 7.24 0.0 0.0 06/27/2021 19:25:56 -7 305 0.0 7.25 0.0 0.0 06/27/2021 19:26:16 -5 311 0.0 7.24 0.0 0.0 06/27/2021 19:26:36 -6 311 0.0 7.24 0.0 0.0 06/27/2021 19:26:56 -6 319 0.0 7.24 0.0 0.0 06/27/2021 19:27:16 -5 318 0.0 7.24 0.0 0.0 06/27/2021 19:27:36 1 302 0.0 7.24 0.0 0.0 06/27/2021 19:27:56 -6 332 0.0 7.24 0.0 0.0 06/27/2021 19:28:16 -4 315 0.0 7.23 0.0 0.0 06/27/2021 19:28:36 -4 318 0.0 7.23 0.0 0.0 06/27/2021 19:28:56 -6 315 0.0 7.23 0.0 0.0 06/27/2021 19:29:16 -3 317 0.0 7.23 0.0 0.0 06/27/2021 19:29:36 -3 326 0.0 7.23 0.0 0.0 06/27/2021 19:29:56 -5 320 0.0 7.23 0.0 0.0 Page 40 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 19:30:36 -5 318 0.0 7.23 0.0 0.0 06/27/2021 19:30:56 -5 326 0.0 7.23 0.0 0.0 06/27/2021 19:31:16 -2 322 0.0 7.23 0.0 0.0 06/27/2021 19:31:36 -5 331 0.0 7.22 0.0 0.0 06/27/2021 19:31:56 -2 350 0.0 7.22 0.0 0.0 06/27/2021 19:32:16 -3 334 0.0 7.22 0.0 0.0 06/27/2021 19:32:36 -2 340 0.0 7.23 0.0 0.0 06/27/2021 19:32:56 -5 340 0.0 7.23 0.0 0.0 06/27/2021 19:33:16 -5 342 0.0 7.22 0.0 0.0 06/27/2021 19:33:36 -4 332 0.0 7.22 0.0 0.0 06/27/2021 19:33:56 -4 336 0.0 7.22 0.0 0.0 06/27/2021 19:34:16 -6 329 0.0 7.22 0.0 0.0 06/27/2021 19:34:36 -6 336 0.0 7.22 0.0 0.0 06/27/2021 19:34:56 -13 302 0.0 7.22 0.0 0.0 06/27/2021 19:35:16 -11 294 0.0 7.21 0.0 0.0 06/27/2021 19:35:36 -12 314 0.0 7.21 0.0 0.0 06/27/2021 19:35:56 -11 312 0.0 7.21 0.0 0.0 06/27/2021 19:36:16 -10 301 0.0 7.21 0.0 0.0 06/27/2021 19:36:36 -10 308 0.0 7.21 0.0 0.0 06/27/2021 19:36:56 -10 307 0.0 7.21 0.0 0.0 06/27/2021 19:37:16 -11 310 0.0 7.20 0.0 0.0 06/27/2021 19:37:36 -12 310 0.0 7.21 0.0 0.0 06/27/2021 19:37:56 -12 310 0.0 7.21 0.0 0.0 06/27/2021 19:38:16 -10 301 0.0 7.20 0.0 0.0 06/27/2021 19:38:36 -9 316 0.0 7.20 0.0 0.0 06/27/2021 19:38:56 -9 300 0.0 7.21 0.0 0.0 06/27/2021 19:39:16 -10 317 0.0 7.20 0.0 0.0 06/27/2021 19:39:36 -7 313 0.0 7.20 0.0 0.0 06/27/2021 19:39:56 -7 313 0.0 7.20 0.0 0.0 06/27/2021 19:40:16 -12 327 0.0 7.20 0.0 0.0 06/27/2021 19:40:36 -10 322 0.0 7.19 0.0 0.0 06/27/2021 19:40:56 -12 326 0.0 7.20 0.0 0.0 06/27/2021 19:41:16 -10 322 0.0 7.20 0.0 0.0 06/27/2021 19:41:36 -11 310 0.0 7.20 0.0 0.0 06/27/2021 19:41:56 -12 321 0.0 7.20 0.0 0.0 06/27/2021 19:42:16 -9 315 0.0 7.19 0.0 0.0 06/27/2021 19:42:36 -10 325 0.0 7.19 0.0 0.0 06/27/2021 19:42:56 -9 320 0.0 7.19 0.0 0.0 06/27/2021 19:43:16 -9 326 0.0 7.19 0.0 0.0 06/27/2021 19:43:36 -11 318 0.0 7.19 0.0 0.0 06/27/2021 19:43:56 -10 331 0.0 7.19 0.0 0.0 06/27/2021 19:44:16 -10 315 0.0 7.19 0.0 0.0 06/27/2021 19:44:36 -11 334 0.0 7.19 0.0 0.0 06/27/2021 19:44:56 -9 334 0.0 7.19 0.0 0.0 06/27/2021 19:45:16 -7 347 0.0 7.19 0.0 0.0 06/27/2021 19:45:36 -11 323 0.0 7.18 0.0 0.0 06/27/2021 19:45:56 -9 330 0.0 7.18 0.0 0.0 06/27/2021 19:46:16 -10 317 0.0 7.18 0.0 0.0 06/27/2021 19:46:36 -11 321 0.0 7.17 0.0 0.0 06/27/2021 19:46:56 -11 332 0.0 7.18 0.0 0.0 06/27/2021 19:47:16 -10 319 0.0 7.18 0.0 0.0 06/27/2021 19:47:36 -11 323 0.0 7.18 0.0 0.0 06/27/2021 19:47:56 -10 333 0.0 7.17 0.0 0.0 06/27/2021 19:48:16 -11 322 0.0 7.18 0.0 0.0 Page 41 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 19:48:56 -9 334 0.0 7.17 0.0 0.0 06/27/2021 19:49:16 -9 325 0.0 7.17 0.0 0.0 06/27/2021 19:49:36 -10 329 0.0 7.17 0.0 0.0 06/27/2021 19:49:56 -10 342 0.0 7.17 0.0 0.0 06/27/2021 19:50:16 -9 342 0.0 7.17 0.0 0.0 06/27/2021 19:50:36 -12 340 0.0 7.16 0.0 0.0 06/27/2021 19:50:56 -9 356 0.0 7.17 0.0 0.0 06/27/2021 19:51:16 -11 346 0.0 7.17 0.0 0.0 06/27/2021 19:51:36 -12 342 0.0 7.17 0.0 0.0 06/27/2021 19:51:56 -12 358 0.0 7.17 0.0 0.0 06/27/2021 19:52:16 -11 366 0.0 7.16 0.0 0.0 06/27/2021 19:52:36 -8 362 0.0 7.16 0.0 0.0 06/27/2021 19:52:56 -9 403 0.0 7.16 0.0 0.0 06/27/2021 19:53:16 -13 425 0.0 7.16 0.0 0.0 06/27/2021 19:53:36 -11 439 0.0 7.16 0.0 0.0 06/27/2021 19:53:56 -6 462 0.0 7.15 0.0 0.0 06/27/2021 19:54:16 -6 441 0.0 7.15 0.0 0.0 06/27/2021 19:54:36 -8 434 0.0 7.15 0.0 0.0 06/27/2021 19:54:56 4 458 0.0 7.15 0.0 0.0 06/27/2021 19:55:16 3 468 0.0 7.15 0.0 0.0 06/27/2021 19:55:36 7 491 0.0 7.15 0.0 0.0 06/27/2021 19:55:56 6 489 0.0 7.15 0.0 0.0 06/27/2021 19:56:16 6 456 0.0 7.15 0.0 0.0 06/27/2021 19:56:36 6 472 0.0 7.15 0.0 0.0 06/27/2021 19:56:56 6 434 0.0 7.15 0.0 0.0 06/27/2021 19:57:16 2 475 0.0 7.15 0.0 0.0 06/27/2021 19:57:36 4 390 0.0 7.15 0.0 0.0 06/27/2021 19:57:56 6 460 0.0 7.14 0.0 0.0 06/27/2021 19:58:16 7 363 0.0 7.14 0.0 0.0 06/27/2021 19:58:36 -2 326 0.0 7.14 0.0 0.0 06/27/2021 19:58:56 7 318 0.0 7.14 0.0 0.0 06/27/2021 19:59:16 2 307 0.0 7.14 0.0 0.0 06/27/2021 19:59:36 7 301 0.0 7.14 0.0 0.0 06/27/2021 19:59:56 -2 300 0.0 7.14 0.0 0.0 06/27/2021 20:00:16 -9 245 0.0 7.14 0.0 0.0 06/27/2021 20:00:36 12 317 0.0 7.14 0.0 0.0 06/27/2021 20:00:56 6 302 0.0 7.14 0.0 0.0 06/27/2021 20:01:16 -4 280 0.0 7.13 0.0 0.0 06/27/2021 20:01:36 3 284 0.0 7.14 0.0 0.0 06/27/2021 20:01:56 6 299 0.0 7.14 0.0 0.0 06/27/2021 20:02:16 -3 293 0.0 7.13 0.0 0.0 06/27/2021 20:02:36 8 306 0.0 7.13 0.0 0.0 06/27/2021 20:02:56 5 315 0.0 7.13 0.0 0.0 06/27/2021 20:03:16 9 303 0.0 7.13 0.0 0.0 06/27/2021 20:03:36 -2 274 0.0 7.13 0.0 0.0 06/27/2021 20:03:56 1 335 0.0 7.13 0.0 0.0 06/27/2021 20:04:16 3 310 0.0 7.13 0.0 0.0 06/27/2021 20:04:36 -2 289 0.0 7.12 0.0 0.0 06/27/2021 20:04:56 2 332 0.0 7.12 0.0 0.0 06/27/2021 20:05:16 7 319 0.0 7.12 0.0 0.0 06/27/2021 20:05:36 -3 282 0.0 7.12 0.0 0.0 06/27/2021 20:05:56 4 339 0.0 7.12 0.0 0.0 06/27/2021 20:06:16 7 309 0.0 7.12 0.0 0.0 06/27/2021 20:06:36 -3 280 0.0 7.12 0.0 0.0 Page 42 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 20:07:16 8 302 0.0 7.11 0.0 0.0 06/27/2021 20:07:36 5 342 0.0 7.12 0.0 0.0 06/27/2021 20:07:56 9 330 0.0 7.11 0.0 0.0 06/27/2021 20:08:16 -1 288 0.0 7.11 0.0 0.0 06/27/2021 20:08:36 3 359 0.0 7.11 0.0 0.0 06/27/2021 20:08:56 5 341 0.0 7.12 0.0 0.0 06/27/2021 20:09:16 -5 318 0.0 7.11 0.0 0.0 06/27/2021 20:09:36 11 340 0.0 7.11 0.0 0.0 06/27/2021 20:09:56 9 338 0.0 7.11 0.0 0.0 06/27/2021 20:10:16 1 357 0.0 7.11 0.0 0.0 06/27/2021 20:10:36 8 332 0.0 7.11 0.0 0.0 06/27/2021 20:10:56 0 308 0.0 7.10 0.0 0.0 06/27/2021 20:11:16 -2 338 0.0 7.11 0.0 0.0 06/27/2021 20:11:36 8 342 0.0 7.11 0.0 0.0 06/27/2021 20:11:56 1 364 0.0 7.11 0.0 0.0 06/27/2021 20:12:16 7 344 0.0 7.10 0.0 0.0 06/27/2021 20:12:36 1 313 0.0 7.10 0.0 0.0 06/27/2021 20:12:56 -3 351 0.0 7.10 0.0 0.0 06/27/2021 20:13:16 1 343 0.0 7.10 0.0 0.0 06/27/2021 20:13:36 -1 336 0.0 7.10 0.0 0.0 06/27/2021 20:13:56 -1 341 0.0 7.10 0.0 0.0 06/27/2021 20:14:16 -3 327 0.0 7.10 0.0 0.0 06/27/2021 20:14:36 -3 338 0.0 7.09 0.0 0.0 06/27/2021 20:14:56 -3 337 0.0 7.10 0.0 0.0 06/27/2021 20:15:16 -3 352 0.0 7.10 0.0 0.0 06/27/2021 20:15:36 -3 346 0.0 7.09 0.0 0.0 06/27/2021 20:15:56 -2 349 0.0 7.09 0.0 0.0 06/27/2021 20:16:16 -4 340 0.0 7.10 0.0 0.0 06/27/2021 20:16:36 -3 336 0.0 7.09 0.0 0.0 06/27/2021 20:16:56 -2 337 0.0 7.09 0.0 0.0 06/27/2021 20:17:16 -1 341 0.0 7.09 0.0 0.0 06/27/2021 20:17:36 -3 350 0.0 7.09 0.0 0.0 06/27/2021 20:17:56 -2 333 0.0 7.09 0.0 0.0 06/27/2021 20:18:16 -3 340 0.0 7.08 0.0 0.0 06/27/2021 20:18:36 -3 328 0.0 7.09 0.0 0.0 06/27/2021 20:18:56 -2 331 0.0 7.09 0.0 0.0 06/27/2021 20:19:16 -4 331 0.0 7.08 0.0 0.0 06/27/2021 20:19:36 -1 340 0.0 7.08 0.0 0.0 06/27/2021 20:19:56 -3 329 0.0 7.08 0.0 0.0 06/27/2021 20:20:16 -1 333 0.0 7.08 0.0 0.0 06/27/2021 20:20:36 -2 333 0.0 7.08 0.0 0.0 06/27/2021 20:20:56 -2 369 0.0 7.08 0.0 0.0 06/27/2021 20:21:16 -1 370 0.0 7.08 0.0 0.0 06/27/2021 20:21:36 -2 369 0.0 7.08 0.0 0.0 06/27/2021 20:21:56 0 360 0.0 7.07 0.0 0.0 06/27/2021 20:22:16 2 374 0.0 7.07 0.0 0.0 06/27/2021 20:22:36 -0 360 0.0 7.07 0.0 0.0 06/27/2021 20:22:56 -9 333 0.0 7.08 0.0 0.0 06/27/2021 20:23:16 -7 332 0.0 7.08 0.0 0.0 06/27/2021 20:23:36 -9 331 0.0 7.07 0.0 0.0 06/27/2021 20:23:56 -10 329 0.0 7.07 0.0 0.0 06/27/2021 20:24:16 -10 323 0.0 7.07 0.0 0.0 06/27/2021 20:24:36 -10 328 0.0 7.07 0.0 0.0 06/27/2021 20:24:56 -9 316 0.0 7.07 0.0 0.0 Page 43 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 20:25:36 -8 320 0.0 7.07 0.0 0.0 06/27/2021 20:25:56 -6 325 0.0 7.06 0.0 0.0 06/27/2021 20:26:16 -10 316 0.0 7.07 0.0 0.0 06/27/2021 20:26:36 -8 314 0.0 7.06 0.0 0.0 06/27/2021 20:26:56 -9 324 0.0 7.07 0.0 0.0 06/27/2021 20:27:16 -11 327 0.0 7.06 0.0 0.0 06/27/2021 20:27:36 -7 326 0.0 7.06 0.0 0.0 06/27/2021 20:27:56 -9 322 0.0 7.06 0.0 0.0 06/27/2021 20:28:16 -11 321 0.0 7.06 0.0 0.0 06/27/2021 20:28:36 -10 318 0.0 7.06 0.0 0.0 06/27/2021 20:28:56 -10 310 0.0 7.05 0.0 0.0 06/27/2021 20:29:16 -10 308 0.0 7.06 0.0 0.0 06/27/2021 20:29:36 -9 318 0.0 7.06 0.0 0.0 06/27/2021 20:29:56 -8 324 0.0 7.05 0.0 0.0 06/27/2021 20:30:16 -9 323 0.0 7.06 0.0 0.0 06/27/2021 20:30:36 -9 314 0.0 7.05 0.0 0.0 06/27/2021 20:30:56 -8 321 0.0 7.06 0.0 0.0 06/27/2021 20:31:16 -11 324 0.0 7.06 0.0 0.0 06/27/2021 20:31:36 -10 312 0.0 7.05 0.0 0.0 06/27/2021 20:31:56 -7 325 0.0 7.05 0.0 0.0 06/27/2021 20:32:16 -9 321 0.0 7.05 0.0 0.0 06/27/2021 20:32:36 -10 318 0.0 7.04 0.0 0.0 06/27/2021 20:32:56 -10 310 0.0 7.05 0.0 0.0 06/27/2021 20:33:16 -8 318 0.0 7.05 0.0 0.0 06/27/2021 20:33:36 -12 319 0.0 7.05 0.0 0.0 06/27/2021 20:33:56 -8 323 0.0 7.05 0.0 0.0 06/27/2021 20:34:16 -9 315 0.0 7.05 0.0 0.0 06/27/2021 20:34:36 -9 317 0.0 7.05 0.0 0.0 06/27/2021 20:34:56 -9 316 0.0 7.05 0.0 0.0 06/27/2021 20:35:16 -7 307 0.0 7.04 0.0 0.0 06/27/2021 20:35:36 -9 318 0.0 7.04 0.0 0.0 06/27/2021 20:35:36 -9 307 0.0 7.04 0.0 0.0 06/27/2021 20:35:56 -10 312 0.0 7.04 0.0 0.0 06/27/2021 20:36:16 -9 323 0.0 7.04 0.0 0.0 06/27/2021 20:36:36 -8 320 0.0 7.04 0.0 0.0 06/27/2021 20:36:56 -8 313 0.0 7.04 0.0 0.0 06/27/2021 20:37:16 -10 314 0.0 7.04 0.0 0.0 06/27/2021 20:37:36 -12 315 0.0 7.04 0.0 0.0 06/27/2021 20:37:56 -9 320 0.0 7.04 0.0 0.0 06/27/2021 20:38:16 -11 312 0.0 7.04 0.0 0.0 06/27/2021 20:38:36 -8 316 0.0 7.04 0.0 0.0 06/27/2021 20:38:56 -10 314 0.0 7.03 0.0 0.0 06/27/2021 20:39:16 -11 308 0.0 7.03 0.0 0.0 06/27/2021 20:39:36 -11 304 0.0 7.04 0.0 0.0 06/27/2021 20:39:56 -9 308 0.0 7.03 0.0 0.0 06/27/2021 20:40:16 -8 308 0.0 7.03 0.0 0.0 06/27/2021 20:40:36 -11 319 0.0 7.04 0.0 0.0 06/27/2021 20:40:56 -10 315 0.0 7.03 0.0 0.0 06/27/2021 20:41:16 -9 308 0.0 7.03 0.0 0.0 06/27/2021 20:41:36 -8 312 0.0 7.03 0.0 0.0 06/27/2021 20:41:56 -9 311 0.0 7.03 0.0 0.0 06/27/2021 20:42:16 -9 315 0.0 7.03 0.0 0.0 06/27/2021 20:42:36 -9 317 0.0 7.03 0.0 0.0 06/27/2021 20:42:56 -12 310 0.0 7.03 0.0 0.0 Page 44 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 20:43:36 -9 311 0.0 7.02 0.0 0.0 06/27/2021 20:43:56 -8 302 0.0 7.03 0.0 0.0 06/27/2021 20:44:16 -8 304 0.0 7.03 0.0 0.0 06/27/2021 20:44:36 -7 308 0.0 7.02 0.0 0.0 06/27/2021 20:44:56 -10 311 0.0 7.03 0.0 0.0 06/27/2021 20:45:16 -9 308 0.0 7.02 0.0 0.0 06/27/2021 20:45:36 -11 310 0.0 7.02 0.0 0.0 06/27/2021 20:46:16 -8 301 0.0 7.02 0.0 0.0 06/27/2021 20:46:36 -9 313 0.0 7.02 0.0 0.0 06/27/2021 20:46:56 -9 303 0.0 7.02 0.0 0.0 06/27/2021 20:47:16 -8 308 0.0 7.02 0.0 0.0 06/27/2021 20:47:36 -8 309 0.0 7.02 0.0 0.0 06/27/2021 20:47:56 -12 301 0.0 7.02 0.0 0.0 06/27/2021 20:48:16 -8 300 0.0 7.01 0.0 0.0 06/27/2021 20:48:36 -7 300 0.0 7.02 0.0 0.0 06/27/2021 20:48:56 -11 303 0.0 7.02 0.0 0.0 06/27/2021 20:49:16 -9 315 0.0 7.01 0.0 0.0 06/27/2021 20:49:36 -8 307 0.0 7.01 0.0 0.0 06/27/2021 20:49:56 -11 302 0.0 7.01 0.0 0.0 06/27/2021 20:50:16 -9 303 0.0 7.01 0.0 0.0 06/27/2021 20:50:36 -8 307 0.0 7.01 0.0 0.0 06/27/2021 20:50:56 -9 311 0.0 7.01 0.0 0.0 06/27/2021 20:51:16 -7 306 0.0 7.01 0.0 0.0 06/27/2021 20:51:36 -9 309 0.0 7.01 0.0 0.0 06/27/2021 20:51:56 -10 307 0.0 7.01 0.0 0.0 06/27/2021 20:52:16 -10 302 0.0 7.01 0.0 0.0 06/27/2021 20:52:36 -9 294 0.0 7.01 0.0 0.0 06/27/2021 20:52:56 -9 298 0.0 7.00 0.0 0.0 06/27/2021 20:53:16 -11 309 0.0 7.01 0.0 0.0 06/27/2021 20:53:36 -8 309 0.0 7.00 0.0 0.0 06/27/2021 20:53:56 -10 302 0.0 7.00 0.0 0.0 06/27/2021 20:54:16 -7 302 0.0 7.00 0.0 0.0 06/27/2021 20:54:36 -9 305 0.0 7.00 0.0 0.0 06/27/2021 20:54:56 -9 306 0.0 7.00 0.0 0.0 06/27/2021 20:55:16 -8 295 0.0 7.01 0.0 0.0 06/27/2021 20:55:36 -9 302 0.0 7.00 0.0 0.0 06/27/2021 20:55:56 -10 305 0.0 7.00 0.0 0.0 06/27/2021 20:56:16 -9 299 0.0 7.00 0.0 0.0 06/27/2021 20:56:36 -10 295 0.0 7.00 0.0 0.0 06/27/2021 20:56:56 -10 294 0.0 6.99 0.0 0.0 06/27/2021 20:57:16 -8 304 0.0 7.00 0.0 0.0 06/27/2021 20:57:36 -8 306 0.0 7.00 0.0 0.0 06/27/2021 20:57:56 -7 307 0.0 7.00 0.0 0.0 06/27/2021 20:58:16 -6 300 0.0 7.00 0.0 0.0 06/27/2021 20:58:36 -7 302 0.0 7.00 0.0 0.0 06/27/2021 20:58:56 -8 299 0.0 7.00 0.0 0.0 06/27/2021 20:59:16 -9 292 0.0 7.00 0.0 0.0 06/27/2021 20:59:36 -9 292 0.0 7.00 0.0 0.0 06/27/2021 20:59:56 -7 298 0.0 7.00 0.0 0.0 06/27/2021 21:00:16 -9 299 0.0 7.00 0.0 0.0 06/27/2021 21:00:36 -6 298 0.0 7.00 0.0 0.0 06/27/2021 21:00:56 -8 293 0.0 6.99 0.0 0.0 06/27/2021 21:01:16 -11 291 0.0 6.99 0.0 0.0 06/27/2021 21:01:36 -8 304 0.0 6.99 0.0 0.0 Page 45 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 21:02:16 -8 304 0.0 6.99 0.0 0.0 06/27/2021 21:02:36 -8 300 0.0 6.99 0.0 0.0 06/27/2021 21:02:56 -9 301 0.0 6.99 0.0 0.0 06/27/2021 21:03:16 -9 300 0.0 6.99 0.0 0.0 06/27/2021 21:03:36 -7 293 0.0 6.98 0.0 0.0 06/27/2021 21:03:56 -9 296 0.0 6.99 0.0 0.0 06/27/2021 21:04:16 -8 295 0.0 6.98 0.0 0.0 06/27/2021 21:04:36 -8 298 0.0 6.99 0.0 0.0 06/27/2021 21:04:56 -9 293 0.0 6.99 0.0 0.0 06/27/2021 21:05:16 -7 289 0.0 6.98 0.0 0.0 06/27/2021 21:05:36 -8 290 0.0 6.99 0.0 0.0 06/27/2021 21:05:56 -5 300 0.0 6.98 0.0 0.0 06/27/2021 21:06:16 -11 301 0.0 6.98 0.0 0.0 06/27/2021 21:06:36 -8 300 0.0 6.98 0.0 0.0 06/27/2021 21:06:56 -9 296 0.0 6.98 0.0 0.0 06/27/2021 21:07:16 -7 297 0.0 6.98 0.0 0.0 06/27/2021 21:07:36 -8 296 0.0 6.98 0.0 0.0 06/27/2021 21:07:56 -8 299 0.0 6.98 0.0 0.0 06/27/2021 21:08:16 -7 294 0.0 6.98 0.0 0.0 06/27/2021 21:08:36 -9 295 0.0 6.98 0.0 0.0 06/27/2021 21:08:56 -9 295 0.0 6.98 0.0 0.0 06/27/2021 21:09:16 -9 292 0.0 6.98 0.0 0.0 06/27/2021 21:09:36 -9 290 0.0 6.98 0.0 0.0 06/27/2021 21:09:56 -7 290 0.0 6.98 0.0 0.0 06/27/2021 21:10:16 -7 292 0.0 6.98 0.0 0.0 06/27/2021 21:10:36 -9 302 0.0 6.98 0.0 0.0 06/27/2021 21:10:56 -8 299 0.0 6.98 0.0 0.0 06/27/2021 21:11:16 -8 295 0.0 6.98 0.0 0.0 06/27/2021 21:11:36 -9 293 0.0 6.97 0.0 0.0 06/27/2021 21:11:56 -6 295 0.0 6.98 0.0 0.0 06/27/2021 21:12:16 -8 299 0.0 6.97 0.0 0.0 06/27/2021 21:12:36 -10 293 0.0 6.97 0.0 0.0 06/27/2021 21:12:56 -7 295 0.0 6.97 0.0 0.0 06/27/2021 21:13:16 -10 295 0.0 6.97 0.0 0.0 06/27/2021 21:13:36 1 332 0.0 6.97 0.0 0.0 06/27/2021 21:13:56 1 317 0.0 6.97 0.0 0.0 06/27/2021 21:14:16 1 339 0.0 6.97 0.0 0.0 06/27/2021 21:14:36 -2 340 0.0 6.97 0.0 0.0 06/27/2021 21:14:56 -1 336 0.0 6.97 0.0 0.0 06/27/2021 21:15:16 -1 331 0.0 6.97 0.0 0.0 06/27/2021 21:15:36 2 347 0.0 6.97 0.0 0.0 06/27/2021 21:15:56 -2 331 0.0 6.97 0.0 0.0 06/27/2021 21:16:16 1 335 0.0 6.97 0.0 0.0 06/27/2021 21:16:36 -2 330 0.0 6.97 0.0 0.0 06/27/2021 21:16:56 -1 329 0.0 6.97 0.0 0.0 06/27/2021 21:17:16 -2 335 0.0 6.97 0.0 0.0 06/27/2021 21:17:36 -2 339 0.0 6.97 0.0 0.0 06/27/2021 21:17:56 -3 330 0.0 6.96 0.0 0.0 06/27/2021 21:18:16 -4 330 0.0 6.97 0.0 0.0 06/27/2021 21:18:36 1 332 0.0 6.97 0.0 0.0 06/27/2021 21:18:56 -1 342 0.0 6.97 0.0 0.0 06/27/2021 21:19:16 -1 334 0.0 6.97 0.0 0.0 06/27/2021 21:19:36 -0 334 0.0 6.96 0.0 0.0 06/27/2021 21:19:56 -1 325 0.0 6.96 0.0 0.0 Page 46 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 21:20:36 -1 320 0.0 6.96 0.0 0.0 06/27/2021 21:20:56 2 332 0.0 6.96 0.0 0.0 06/27/2021 21:21:16 -2 322 0.0 6.96 0.0 0.0 06/27/2021 21:21:36 -3 330 0.0 6.96 0.0 0.0 06/27/2021 21:21:56 -3 328 0.0 6.96 0.0 0.0 06/27/2021 21:22:16 -3 320 0.0 6.96 0.0 0.0 06/27/2021 21:22:36 -1 324 0.0 6.96 0.0 0.0 06/27/2021 21:22:56 -1 342 0.0 6.96 0.0 0.0 06/27/2021 21:23:16 -3 334 0.0 6.96 0.0 0.0 06/27/2021 21:23:36 -2 339 0.0 6.96 0.0 0.0 06/27/2021 21:23:56 -2 322 0.0 6.96 0.0 0.0 06/27/2021 21:24:16 -2 331 0.0 6.96 0.0 0.0 06/27/2021 21:24:36 -3 330 0.0 6.96 0.0 0.0 06/27/2021 21:24:56 -1 322 0.0 6.96 0.0 0.0 06/27/2021 21:25:16 -1 312 0.0 6.96 0.0 0.0 06/27/2021 21:25:36 -1 320 0.0 6.96 0.0 0.0 06/27/2021 21:25:56 -3 314 0.0 6.96 0.0 0.0 06/27/2021 21:26:16 -1 322 0.0 6.95 0.0 0.0 06/27/2021 21:26:36 -1 312 0.0 6.96 0.0 0.0 06/27/2021 21:26:56 -1 322 0.0 6.95 0.0 0.0 06/27/2021 21:27:16 -0 327 0.0 6.96 0.0 0.0 06/27/2021 21:27:36 -1 334 0.0 6.95 0.0 0.0 06/27/2021 21:27:56 -2 346 0.0 6.95 0.0 0.0 06/27/2021 21:28:16 -1 326 0.0 6.95 0.0 0.0 06/27/2021 21:28:36 -0 323 0.0 6.96 0.0 0.0 06/27/2021 21:28:56 -1 339 0.0 6.96 0.0 0.0 06/27/2021 21:29:16 1 324 0.0 6.95 0.0 0.0 06/27/2021 21:29:36 2 322 0.0 6.95 0.0 0.0 06/27/2021 21:29:56 -0 329 0.0 6.95 0.0 0.0 06/27/2021 21:30:16 -2 327 0.0 6.95 0.0 0.0 06/27/2021 21:30:36 -3 321 0.0 6.95 0.0 0.0 06/27/2021 21:30:56 -4 324 0.0 6.95 0.0 0.0 06/27/2021 21:31:16 1 330 0.0 6.95 0.0 0.0 06/27/2021 21:31:36 -1 330 0.0 6.95 0.0 0.0 06/27/2021 21:31:56 -5 337 0.0 6.95 0.0 0.0 06/27/2021 21:32:16 -0 322 0.0 6.95 0.0 0.0 06/27/2021 21:32:36 -1 327 0.0 6.95 0.0 0.0 06/27/2021 21:32:56 -1 319 0.0 6.95 0.0 0.0 06/27/2021 21:33:16 -3 325 0.0 6.95 0.0 0.0 06/27/2021 21:33:36 -5 306 0.0 6.95 0.0 0.0 06/27/2021 21:33:56 -0 330 0.0 6.95 0.0 0.0 06/27/2021 21:34:16 -4 320 0.0 6.95 0.0 0.0 06/27/2021 21:34:36 -2 328 0.0 6.95 0.0 0.0 06/27/2021 21:34:56 1 325 0.0 6.95 0.0 0.0 06/27/2021 21:35:16 -1 320 0.0 6.95 0.0 0.0 06/27/2021 21:35:36 -0 326 0.0 6.95 0.0 0.0 06/27/2021 21:35:56 -2 322 0.0 6.95 0.0 0.0 06/27/2021 21:36:16 -1 338 0.0 6.95 0.0 0.0 06/27/2021 21:36:36 -5 328 0.0 6.95 0.0 0.0 06/27/2021 21:36:56 -1 319 0.0 6.94 0.0 0.0 06/27/2021 21:37:16 -1 327 0.0 6.95 0.0 0.0 06/27/2021 21:37:36 -2 338 0.0 6.94 0.0 0.0 06/27/2021 21:37:56 -2 330 0.0 6.94 0.0 0.0 06/27/2021 21:38:16 -1 334 0.0 6.94 0.0 0.0 Page 47 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 21:38:56 -0 340 0.0 6.94 0.0 0.0 06/27/2021 21:39:16 -2 330 0.0 6.95 0.0 0.0 06/27/2021 21:39:36 -3 337 0.0 6.95 0.0 0.0 06/27/2021 21:39:56 0 342 0.0 6.94 0.0 0.0 06/27/2021 21:40:16 -1 331 0.0 6.94 0.0 0.0 06/27/2021 21:40:36 -2 341 0.0 6.94 0.0 0.0 06/27/2021 21:40:56 -1 343 0.0 6.94 0.0 0.0 06/27/2021 21:41:16 -1 340 0.0 6.94 0.0 0.0 06/27/2021 21:41:36 -1 326 0.0 6.94 0.0 0.0 06/27/2021 21:41:56 -3 332 0.0 6.94 0.0 0.0 06/27/2021 21:42:16 -1 331 0.0 6.94 0.0 0.0 06/27/2021 21:42:36 -10 293 0.0 6.94 0.0 0.0 06/27/2021 21:42:56 -8 300 0.0 6.94 0.0 0.0 06/27/2021 21:43:16 -9 304 0.0 6.94 0.0 0.0 06/27/2021 21:43:36 -8 303 0.0 6.94 0.0 0.0 06/27/2021 21:43:56 -9 298 0.0 6.94 0.0 0.0 06/27/2021 21:44:16 -7 301 0.0 6.94 0.0 0.0 06/27/2021 21:44:36 -9 298 0.0 6.94 0.0 0.0 06/27/2021 21:44:56 -7 293 0.0 6.94 0.0 0.0 06/27/2021 21:45:16 -9 287 0.0 6.94 0.0 0.0 06/27/2021 21:45:36 -9 289 0.0 6.94 0.0 0.0 06/27/2021 21:45:56 -10 294 0.0 6.94 0.0 0.0 06/27/2021 21:46:16 -7 303 0.0 6.94 0.0 0.0 06/27/2021 21:46:36 -5 300 0.0 6.94 0.0 0.0 06/27/2021 21:46:56 -8 298 0.0 6.94 0.0 0.0 06/27/2021 21:47:16 -5 299 0.0 6.94 0.0 0.0 06/27/2021 21:47:36 -6 297 0.0 6.94 0.0 0.0 06/27/2021 21:47:56 -7 302 0.0 6.93 0.0 0.0 06/27/2021 21:48:16 -8 290 0.0 6.94 0.0 0.0 06/27/2021 21:48:36 -8 296 0.0 6.93 0.0 0.0 06/27/2021 21:48:56 -9 296 0.0 6.94 0.0 0.0 06/27/2021 21:49:16 -7 298 0.0 6.93 0.0 0.0 06/27/2021 21:49:36 -9 291 0.0 6.93 0.0 0.0 06/27/2021 21:49:56 -6 288 0.0 6.93 0.0 0.0 06/27/2021 21:50:16 -6 289 0.0 6.93 0.0 0.0 06/27/2021 21:50:36 -6 298 0.0 6.93 0.0 0.0 06/27/2021 21:50:56 -7 303 0.0 6.94 0.0 0.0 06/27/2021 21:51:16 -7 300 0.0 6.94 0.0 0.0 06/27/2021 21:51:36 -7 293 0.0 6.93 0.0 0.0 06/27/2021 21:51:56 -7 296 0.0 6.93 0.0 0.0 06/27/2021 21:52:16 -8 295 0.0 6.93 0.0 0.0 06/27/2021 21:52:36 -8 288 0.0 6.93 0.0 0.0 06/27/2021 21:52:56 -9 286 0.0 6.93 0.0 0.0 06/27/2021 21:53:16 -8 294 0.0 6.93 0.0 0.0 06/27/2021 21:53:36 -7 304 0.0 6.93 0.0 0.0 06/27/2021 21:53:56 -7 299 0.0 6.93 0.0 0.0 06/27/2021 21:54:16 -7 301 0.0 6.93 0.0 0.0 06/27/2021 21:54:36 -9 311 0.0 6.93 0.0 0.0 06/27/2021 21:54:56 -7 310 0.0 6.93 0.0 0.0 06/27/2021 21:55:16 -5 315 0.0 6.93 0.0 0.0 06/27/2021 21:55:36 -7 314 0.0 6.93 0.0 0.0 06/27/2021 21:55:56 -8 309 0.0 6.93 0.0 0.0 06/27/2021 21:56:16 -8 311 0.0 6.93 0.0 0.0 06/27/2021 21:56:36 -9 300 0.0 6.93 0.0 0.0 Page 48 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 21:57:16 -9 302 0.0 6.93 0.0 0.0 06/27/2021 21:57:36 -7 310 0.0 6.93 0.0 0.0 06/27/2021 21:57:56 -7 312 0.0 6.93 0.0 0.0 06/27/2021 21:58:16 -6 312 0.0 6.93 0.0 0.0 06/27/2021 21:58:36 -8 308 0.0 6.92 0.0 0.0 06/27/2021 21:58:56 -7 311 0.0 6.92 0.0 0.0 06/27/2021 21:59:16 -8 307 0.0 6.93 0.0 0.0 06/27/2021 21:59:36 -5 304 0.0 6.92 0.0 0.0 06/27/2021 21:59:56 -7 302 0.0 6.93 0.0 0.0 06/27/2021 22:00:16 -11 298 0.0 6.92 0.0 0.0 06/27/2021 22:00:36 -8 306 0.0 6.93 0.0 0.0 06/27/2021 22:00:56 -11 310 0.0 6.93 0.0 0.0 06/27/2021 22:01:16 -8 312 0.0 6.93 0.0 0.0 06/27/2021 22:01:36 -8 312 0.0 6.92 0.0 0.0 06/27/2021 22:01:56 -8 310 0.0 6.93 0.0 0.0 06/27/2021 22:02:16 -9 310 0.0 6.92 0.0 0.0 06/27/2021 22:02:36 -9 303 0.0 6.93 0.0 0.0 06/27/2021 22:02:56 -9 301 0.0 6.93 0.0 0.0 06/27/2021 22:03:16 -5 297 0.0 6.93 0.0 0.0 06/27/2021 22:03:36 -8 297 0.0 6.92 0.0 0.0 06/27/2021 22:03:56 -8 302 0.0 6.92 0.0 0.0 06/27/2021 22:04:16 -9 310 0.0 6.93 0.0 0.0 06/27/2021 22:04:36 -7 312 0.0 6.92 0.0 0.0 06/27/2021 22:04:56 -6 306 0.0 6.93 0.0 0.0 06/27/2021 22:05:16 -8 312 0.0 6.92 0.0 0.0 06/27/2021 22:05:36 -7 306 0.0 6.92 0.0 0.0 06/27/2021 22:05:56 -8 301 0.0 6.92 0.0 0.0 06/27/2021 22:06:16 -10 297 0.0 6.92 0.0 0.0 06/27/2021 22:06:36 -10 300 0.0 6.92 0.0 0.0 06/27/2021 22:06:56 -11 297 0.0 6.92 0.0 0.0 06/27/2021 22:07:16 -5 312 0.0 6.92 0.0 0.0 06/27/2021 22:07:36 -7 311 0.0 6.92 0.0 0.0 06/27/2021 22:07:56 -7 305 0.0 6.92 0.0 0.0 06/27/2021 22:08:16 -8 307 0.0 6.92 0.0 0.0 06/27/2021 22:08:36 -9 303 0.0 6.92 0.0 0.0 06/27/2021 22:08:56 -9 309 0.0 6.92 0.0 0.0 06/27/2021 22:09:16 -9 305 0.0 6.92 0.0 0.0 06/27/2021 22:09:36 -9 296 0.0 6.92 0.0 0.0 06/27/2021 22:09:56 -8 299 0.0 6.92 0.0 0.0 06/27/2021 22:10:16 -9 301 0.0 6.92 0.0 0.0 06/27/2021 22:10:36 -7 314 0.0 6.92 0.0 0.0 06/27/2021 22:10:56 -7 311 0.0 6.92 0.0 0.0 06/27/2021 22:11:16 -7 304 0.0 6.92 0.0 0.0 06/27/2021 22:11:36 -7 302 0.0 6.92 0.0 0.0 06/27/2021 22:11:56 -8 308 0.0 6.91 0.0 0.0 06/27/2021 22:12:16 -7 307 0.0 6.92 0.0 0.0 06/27/2021 22:12:36 -8 292 0.0 6.92 0.0 0.0 06/27/2021 22:12:56 -7 297 0.0 6.92 0.0 0.0 06/27/2021 22:13:16 -6 305 0.0 6.92 0.0 0.0 06/27/2021 22:13:36 -8 312 0.0 6.92 0.0 0.0 06/27/2021 22:13:56 -6 308 0.0 6.92 0.0 0.0 06/27/2021 22:14:16 -7 306 0.0 6.92 0.0 0.0 06/27/2021 22:14:36 -8 303 0.0 6.92 0.0 0.0 06/27/2021 22:14:56 -9 301 0.0 6.91 0.0 0.0 Page 49 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 22:15:36 -9 306 0.0 6.91 0.0 0.0 06/27/2021 22:15:56 -9 298 0.0 6.91 0.0 0.0 06/27/2021 22:16:16 -7 305 0.0 6.92 0.0 0.0 06/27/2021 22:16:36 -7 311 0.0 6.91 0.0 0.0 06/27/2021 22:16:56 -9 310 0.0 6.91 0.0 0.0 06/27/2021 22:17:16 -5 307 0.0 6.91 0.0 0.0 06/27/2021 22:17:36 -6 307 0.0 6.92 0.0 0.0 06/27/2021 22:17:56 -8 305 0.0 6.91 0.0 0.0 06/27/2021 22:18:16 -8 305 0.0 6.91 0.0 0.0 06/27/2021 22:18:36 -8 296 0.0 6.91 0.0 0.0 06/27/2021 22:18:56 -7 297 0.0 6.92 0.0 0.0 06/27/2021 22:19:16 -8 300 0.0 6.91 0.0 0.0 06/27/2021 22:19:36 -9 305 0.0 6.91 0.0 0.0 06/27/2021 22:19:56 -7 310 0.0 6.91 0.0 0.0 06/27/2021 22:20:16 -5 306 0.0 6.91 0.0 0.0 06/27/2021 22:20:36 -11 302 0.0 6.91 0.0 0.0 06/27/2021 22:20:56 -9 305 0.0 6.91 0.0 0.0 06/27/2021 22:21:16 -5 306 0.0 6.91 0.0 0.0 06/27/2021 22:21:36 -8 304 0.0 6.91 0.0 0.0 06/27/2021 22:21:56 -5 298 0.0 6.90 0.0 0.0 06/27/2021 22:22:16 -5 301 0.0 6.91 0.0 0.0 06/27/2021 22:22:36 -10 305 0.0 6.91 0.0 0.0 06/27/2021 22:22:56 -8 310 0.0 6.91 0.0 0.0 06/27/2021 22:23:16 -6 306 0.0 6.91 0.0 0.0 06/27/2021 22:23:36 -5 303 0.0 6.91 0.0 0.0 06/27/2021 22:23:56 -9 304 0.0 6.91 0.0 0.0 06/27/2021 22:24:16 -7 308 0.0 6.91 0.0 0.0 06/27/2021 22:24:36 -7 304 0.0 6.91 0.0 0.0 06/27/2021 22:24:56 -7 296 0.0 6.91 0.0 0.0 06/27/2021 22:25:16 -8 298 0.0 6.91 0.0 0.0 06/27/2021 22:25:36 -5 304 0.0 6.91 0.0 0.0 06/27/2021 22:25:56 -7 308 0.0 6.91 0.0 0.0 06/27/2021 22:26:16 -6 306 0.0 6.91 0.0 0.0 06/27/2021 22:26:36 -5 302 0.0 6.91 0.0 0.0 06/27/2021 22:26:56 -7 294 0.0 6.91 0.0 0.0 06/27/2021 22:27:16 -7 301 0.0 6.90 0.0 0.0 06/27/2021 22:27:36 -6 303 0.0 6.91 0.0 0.0 06/27/2021 22:27:56 -8 294 0.0 6.91 0.0 0.0 06/27/2021 22:28:16 -7 296 0.0 6.91 0.0 0.0 06/27/2021 22:28:36 -8 303 0.0 6.91 0.0 0.0 06/27/2021 22:28:56 -6 306 0.0 6.91 0.0 0.0 06/27/2021 22:29:16 -8 308 0.0 6.90 0.0 0.0 06/27/2021 22:29:36 -8 301 0.0 6.91 0.0 0.0 06/27/2021 22:29:56 -6 296 0.0 6.91 0.0 0.0 06/27/2021 22:30:16 -7 304 0.0 6.91 0.0 0.0 06/27/2021 22:30:36 -6 301 0.0 6.91 0.0 0.0 06/27/2021 22:30:56 -7 302 0.0 6.91 0.0 0.0 06/27/2021 22:31:16 -7 296 0.0 6.91 0.0 0.0 06/27/2021 22:31:36 -6 297 0.0 6.91 0.0 0.0 06/27/2021 22:31:56 -6 303 0.0 6.91 0.0 0.0 06/27/2021 22:32:16 -7 306 0.0 6.91 0.0 0.0 06/27/2021 22:32:36 -8 302 0.0 6.91 0.0 0.0 06/27/2021 22:32:56 -9 295 0.0 6.91 0.0 0.0 06/27/2021 22:33:16 -6 305 0.0 6.90 0.0 0.0 Page 50 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 22:33:56 -9 301 0.0 6.91 0.0 0.0 06/27/2021 22:34:16 -7 293 0.0 6.91 0.0 0.0 06/27/2021 22:34:36 -7 300 0.0 6.91 0.0 0.0 06/27/2021 22:34:56 -5 305 0.0 6.91 0.0 0.0 06/27/2021 22:35:16 -5 310 0.0 6.91 0.0 0.0 06/27/2021 22:35:36 -9 300 0.0 6.91 0.0 0.0 06/27/2021 22:35:56 -9 295 0.0 6.90 0.0 0.0 06/27/2021 22:36:16 -10 294 0.0 6.91 0.0 0.0 06/27/2021 22:36:36 -9 301 0.0 6.91 0.0 0.0 06/27/2021 22:36:56 -10 119 0.0 6.91 0.0 0.0 06/27/2021 22:37:16 -11 110 0.0 6.90 0.0 0.0 06/27/2021 22:37:36 2 159 0.0 6.90 0.0 0.0 06/27/2021 22:37:56 -6 122 0.0 6.90 0.0 0.0 06/27/2021 22:38:16 8 180 0.0 6.91 0.0 0.0 06/27/2021 22:38:36 -6 131 0.0 6.90 0.0 0.0 06/27/2021 22:38:56 -3 153 0.0 6.90 0.0 0.0 06/27/2021 22:39:16 -3 142 0.0 6.90 0.0 0.0 06/27/2021 22:39:36 -4 136 0.0 6.90 0.0 0.0 06/27/2021 22:39:56 -5 131 0.0 6.91 0.0 0.0 06/27/2021 22:40:16 -5 111 0.0 6.91 0.0 0.0 06/27/2021 22:40:36 -2 104 0.0 6.90 0.0 0.0 06/27/2021 22:40:56 -6 111 0.0 6.90 0.0 0.0 06/27/2021 22:41:16 -3 109 0.0 6.90 0.0 0.0 06/27/2021 22:41:36 -2 117 0.0 6.90 0.0 0.0 06/27/2021 22:41:56 -5 109 0.0 6.90 0.0 0.0 06/27/2021 22:42:16 -5 106 0.0 6.90 0.0 0.0 06/27/2021 22:42:36 -6 96 0.0 6.91 0.0 0.0 06/27/2021 22:42:56 -13 77 0.0 6.90 0.0 0.0 06/27/2021 22:43:16 -12 79 0.0 6.90 0.0 0.0 06/27/2021 22:43:36 -12 76 0.0 6.91 0.0 0.0 06/27/2021 22:43:56 -13 77 0.0 6.90 0.0 0.0 06/27/2021 22:44:16 -13 77 0.0 6.90 0.0 0.0 06/27/2021 22:44:36 -11 77 0.0 6.91 0.0 0.0 06/27/2021 22:44:56 -13 78 0.0 5.32 0.0 0.0 06/27/2021 22:45:16 -12 79 0.0 5.34 0.0 0.0 06/27/2021 22:45:36 -11 75 0.0 5.35 0.0 0.0 06/27/2021 22:45:56 -12 79 0.0 5.36 0.0 0.0 06/27/2021 22:46:16 -11 76 0.0 5.36 0.0 0.0 06/27/2021 22:46:36 -13 75 0.0 5.37 0.0 0.0 06/27/2021 22:46:56 -14 77 0.0 5.37 0.0 0.0 06/27/2021 22:47:16 -11 79 0.0 5.37 0.0 0.0 06/27/2021 22:47:36 -9 78 0.0 5.38 0.0 0.0 06/27/2021 22:47:56 -13 78 0.0 5.38 0.0 0.0 06/27/2021 22:48:16 -11 77 0.0 5.38 0.0 0.0 06/27/2021 22:48:36 -9 77 0.0 5.39 0.0 0.0 06/27/2021 22:48:56 -14 77 0.0 5.39 0.0 0.0 06/27/2021 22:49:16 -12 80 0.0 5.39 0.0 0.0 06/27/2021 22:49:36 -13 78 0.0 5.40 0.0 0.0 06/27/2021 22:49:56 -9 78 0.0 5.39 0.0 0.0 06/27/2021 22:50:14 -10 78 0.0 5.40 0.0 0.0 PUMP WATER AHEAD 06/27/2021 22:50:16 -12 78 0.0 5.40 0.0 0.0 06/27/2021 22:50:36 -9 78 0.0 5.40 0.0 0.0 06/27/2021 22:50:56 -6 78 0.1 5.41 0.0 0.0 06/27/2021 22:51:16 -6 77 0.5 5.41 0.0 0.0 Page 51 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 22:51:56 7 89 0.8 5.41 0.5 0.5 06/27/2021 22:52:16 59 113 1.8 5.41 0.9 0.9 06/27/2021 22:52:36 180 205 2.1 5.41 1.6 1.6 06/27/2021 22:52:56 179 201 2.1 5.41 2.3 2.3 06/27/2021 22:53:16 174 198 2.0 5.42 3.0 3.0 06/27/2021 22:53:35 56 129 0.0 5.42 3.0 3.0 RIG HAS RETURNS 06/27/2021 22:53:36 52 131 0.0 5.42 3.0 3.0 06/27/2021 22:53:48 51 130 0.0 5.42 3.0 3.0 LOW PRESSURE STALL 06/27/2021 22:53:56 54 130 0.0 5.42 3.0 3.0 06/27/2021 22:54:16 615 694 0.0 5.42 3.1 3.1 06/27/2021 22:54:36 598 682 0.0 5.42 3.1 3.1 06/27/2021 22:54:56 581 663 0.0 5.42 3.1 3.1 06/27/2021 22:55:16 566 647 0.0 5.42 3.1 3.1 06/27/2021 22:55:36 555 640 0.0 5.43 3.1 3.1 06/27/2021 22:55:39 551 636 0.0 5.42 3.1 3.1 HIGH TEST TO 4000 06/27/2021 22:55:56 541 627 0.0 5.42 3.1 3.1 06/27/2021 22:56:16 535 619 0.0 5.43 3.1 3.1 06/27/2021 22:56:36 526 610 0.0 5.43 3.1 3.1 06/27/2021 22:56:56 513 595 0.0 5.43 3.1 3.1 06/27/2021 22:57:16 502 588 0.0 5.43 3.1 3.1 06/27/2021 22:57:36 879 970 0.1 5.43 3.1 3.1 06/27/2021 22:57:56 2176 2265 0.0 5.43 3.1 3.1 06/27/2021 22:58:16 3917 4019 0.0 5.43 3.1 3.1 06/27/2021 22:58:36 3903 4005 0.0 5.43 3.1 3.1 06/27/2021 22:58:56 3872 3970 0.0 5.43 3.1 3.1 06/27/2021 22:59:16 3843 3940 0.0 5.44 3.1 3.1 06/27/2021 22:59:36 3818 3916 0.0 5.43 3.1 3.1 06/27/2021 22:59:56 3797 3893 0.0 5.44 3.1 3.1 06/27/2021 23:00:16 3776 3871 0.0 5.43 3.1 3.1 06/27/2021 23:00:36 3748 3844 0.0 5.43 3.1 3.1 06/27/2021 23:00:56 3724 3821 0.0 5.44 3.1 3.1 06/27/2021 23:01:16 17 137 0.0 5.44 3.1 3.1 06/27/2021 23:01:36 70 146 0.0 5.43 3.1 3.1 06/27/2021 23:01:56 35 115 0.0 5.44 3.1 3.1 06/27/2021 23:02:16 36 115 0.0 5.44 3.1 3.1 06/27/2021 23:02:36 33 114 0.0 5.44 3.1 3.1 06/27/2021 23:02:56 33 114 0.0 5.45 3.1 3.1 06/27/2021 23:03:16 33 116 0.0 5.45 3.1 3.1 06/27/2021 23:03:36 33 115 0.0 5.45 3.1 3.1 06/27/2021 23:03:56 34 115 0.0 5.45 3.1 3.1 06/27/2021 23:04:16 34 117 0.0 8.28 3.1 3.1 06/27/2021 23:04:24 33 116 0.0 8.27 3.1 3.1 BATCH UP SPACERR 06/27/2021 23:04:29 33 115 0.0 8.26 3.1 3.1 Reset Total, Vol = 3.13 bbl 06/27/2021 23:04:36 35 115 0.0 8.26 0.0 0.0 06/27/2021 23:04:56 33 115 0.0 8.25 0.0 0.0 06/27/2021 23:05:16 35 117 0.0 8.73 0.0 0.0 06/27/2021 23:05:36 32 115 0.0 8.84 0.0 0.0 06/27/2021 23:05:56 33 112 0.0 9.17 0.0 0.0 06/27/2021 23:06:16 32 117 0.0 10.04 0.0 0.0 06/27/2021 23:06:36 30 113 0.0 10.81 0.0 0.0 06/27/2021 23:06:56 31 115 0.0 11.18 0.0 0.0 06/27/2021 23:07:16 31 112 0.0 11.18 0.0 0.0 06/27/2021 23:07:36 32 114 0.0 11.17 0.0 0.0 06/27/2021 23:07:56 32 113 0.0 11.18 0.0 0.0 Page 52 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 23:08:36 33 114 0.0 11.31 0.0 0.0 06/27/2021 23:08:56 34 115 0.0 11.45 0.0 0.0 06/27/2021 23:09:16 32 116 0.0 11.65 0.0 0.0 06/27/2021 23:09:36 33 115 0.0 11.66 0.0 0.0 06/27/2021 23:09:56 33 116 0.0 11.65 0.0 0.0 06/27/2021 23:10:16 32 115 0.0 11.69 0.0 0.0 06/27/2021 23:10:36 32 112 0.0 11.81 0.0 0.0 06/27/2021 23:10:56 32 114 0.0 11.82 0.0 0.0 06/27/2021 23:11:16 32 114 0.0 11.66 0.0 0.0 06/27/2021 23:11:21 32 114 0.0 11.65 0.0 0.0 START SPACER 06/27/2021 23:11:36 29 116 0.0 11.65 0.0 0.0 06/27/2021 23:11:56 69 143 0.0 11.61 0.0 0.0 06/27/2021 23:12:16 191 203 2.1 11.60 0.4 0.4 06/27/2021 23:12:36 242 229 2.6 11.55 1.2 1.2 06/27/2021 23:12:56 282 253 3.0 11.35 2.1 2.1 06/27/2021 23:13:16 282 250 3.0 11.35 3.1 3.1 06/27/2021 23:13:36 289 249 3.0 11.48 4.1 4.1 06/27/2021 23:13:56 293 244 3.0 11.57 5.1 5.1 06/27/2021 23:14:16 301 246 3.0 11.65 6.1 6.1 06/27/2021 23:14:36 285 244 3.0 11.63 7.1 7.1 06/27/2021 23:14:56 279 239 3.0 11.60 8.1 8.1 06/27/2021 23:15:16 179 196 2.0 11.54 8.8 8.8 06/27/2021 23:15:36 180 203 2.0 11.47 9.5 9.5 06/27/2021 23:15:56 180 200 2.0 11.42 10.2 10.2 06/27/2021 23:16:16 178 199 2.0 11.38 10.8 10.8 06/27/2021 23:16:36 166 194 2.0 11.35 11.5 11.5 06/27/2021 23:16:56 170 195 2.0 11.33 12.1 12.1 06/27/2021 23:17:16 175 195 2.0 11.32 12.8 12.8 06/27/2021 23:17:36 161 193 2.0 11.31 13.4 13.4 06/27/2021 23:17:56 162 191 2.0 11.35 14.1 14.1 06/27/2021 23:18:16 166 192 2.0 11.36 14.7 14.7 06/27/2021 23:18:36 185 205 2.3 11.38 15.4 15.4 06/27/2021 23:18:56 215 215 2.5 11.40 16.2 16.2 06/27/2021 23:19:16 204 209 2.5 11.42 17.1 17.1 06/27/2021 23:19:36 209 207 2.5 11.44 17.9 17.9 06/27/2021 23:19:56 210 207 2.5 11.46 18.7 18.7 06/27/2021 23:20:16 208 207 2.5 11.47 19.6 19.6 06/27/2021 23:20:36 206 206 2.5 11.49 20.4 20.4 06/27/2021 23:20:56 205 206 2.5 11.51 21.3 21.3 06/27/2021 23:21:16 215 204 2.5 11.52 22.1 22.1 06/27/2021 23:21:36 213 205 2.5 11.53 22.9 22.9 06/27/2021 23:21:56 213 207 2.5 11.53 23.8 23.8 06/27/2021 23:22:16 205 204 2.5 11.54 24.6 24.6 06/27/2021 23:22:36 204 200 2.5 11.55 25.4 25.4 06/27/2021 23:22:56 202 199 2.5 11.53 26.3 26.3 06/27/2021 23:23:16 196 197 2.5 11.45 27.1 27.1 06/27/2021 23:23:36 194 198 2.5 11.37 28.0 28.0 06/27/2021 23:23:56 191 197 2.5 11.30 28.8 28.8 06/27/2021 23:24:16 194 195 2.5 11.27 29.6 29.6 06/27/2021 23:24:36 191 193 2.5 11.25 30.5 30.5 06/27/2021 23:24:56 188 193 2.5 11.30 31.3 31.3 06/27/2021 23:25:16 191 192 2.5 11.38 32.2 32.2 06/27/2021 23:25:36 195 191 2.5 11.44 33.0 33.0 06/27/2021 23:25:56 198 193 2.5 11.49 33.8 33.8 Page 53 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 23:26:36 197 189 2.5 11.58 35.5 35.5 06/27/2021 23:26:56 195 188 2.5 11.62 36.3 36.3 06/27/2021 23:27:16 197 187 2.5 11.61 37.2 37.2 06/27/2021 23:27:36 192 188 2.5 11.60 38.0 38.0 06/27/2021 23:27:56 189 187 2.5 11.58 38.9 38.9 06/27/2021 23:28:16 187 183 2.5 11.57 39.7 39.7 06/27/2021 23:28:36 181 183 2.5 11.56 40.5 40.5 06/27/2021 23:28:56 184 182 2.5 11.54 41.4 41.4 06/27/2021 23:29:16 180 181 2.5 11.53 42.2 42.2 06/27/2021 23:29:36 188 181 2.5 11.53 43.0 43.0 06/27/2021 23:29:56 187 179 2.5 11.52 43.9 43.9 06/27/2021 23:30:16 185 181 2.5 11.52 44.7 44.7 06/27/2021 23:30:36 179 177 2.5 11.51 45.6 45.6 06/27/2021 23:30:56 183 176 2.5 11.49 46.4 46.4 06/27/2021 23:31:16 180 177 2.5 11.47 47.2 47.2 06/27/2021 23:31:36 180 174 2.5 11.46 48.1 48.1 06/27/2021 23:31:56 175 173 2.5 11.45 48.9 48.9 06/27/2021 23:32:16 172 171 2.5 11.46 49.7 49.7 06/27/2021 23:32:36 173 171 2.5 11.42 50.6 50.6 06/27/2021 23:32:56 170 174 2.5 11.28 51.4 51.4 06/27/2021 23:33:16 162 168 2.5 11.40 52.3 52.3 06/27/2021 23:33:36 156 167 2.5 11.58 53.1 53.1 06/27/2021 23:33:56 168 165 2.5 11.55 53.9 53.9 06/27/2021 23:34:16 173 167 2.5 11.64 54.8 54.8 06/27/2021 23:34:36 174 165 2.5 11.70 55.6 55.6 06/27/2021 23:34:56 174 195 2.5 11.71 56.4 56.4 06/27/2021 23:35:16 181 199 2.5 11.67 57.3 57.3 06/27/2021 23:35:36 177 199 2.5 11.48 58.1 58.1 06/27/2021 23:35:56 165 211 2.5 11.50 58.9 58.9 06/27/2021 23:36:16 162 197 2.5 11.54 59.8 59.8 06/27/2021 23:36:36 28 126 0.0 11.54 60.1 60.1 06/27/2021 23:36:56 24 133 0.0 11.54 60.1 60.1 06/27/2021 23:37:16 30 152 0.0 11.54 60.1 60.1 06/27/2021 23:37:24 26 126 0.0 11.54 60.1 60.1 Reset Total, Vol = 60.05 bbl 06/27/2021 23:37:36 26 136 0.0 11.55 60.1 0.0 06/27/2021 23:37:56 28 141 0.0 11.55 60.1 0.0 06/27/2021 23:38:16 24 133 0.0 11.55 60.1 0.0 06/27/2021 23:38:36 29 157 0.0 11.54 60.1 0.0 06/27/2021 23:38:56 23 127 0.0 11.54 60.1 0.0 06/27/2021 23:39:16 30 144 0.0 11.55 60.1 0.0 06/27/2021 23:39:36 24 128 0.0 11.55 60.1 0.0 06/27/2021 23:39:56 24 131 0.0 11.55 60.1 0.0 06/27/2021 23:40:16 21 126 0.0 11.55 60.1 0.0 06/27/2021 23:40:36 31 169 0.0 10.22 60.1 0.0 06/27/2021 23:40:56 18 120 0.0 9.21 60.1 0.0 06/27/2021 23:41:16 21 128 0.0 9.24 60.1 0.0 06/27/2021 23:41:17 20 117 0.0 9.24 60.1 0.0 CEMENT WET 06/27/2021 23:41:36 19 126 0.0 10.56 60.1 0.0 06/27/2021 23:41:56 20 119 0.0 11.83 60.1 0.0 06/27/2021 23:42:16 17 117 0.0 12.89 60.1 0.0 06/27/2021 23:42:36 18 124 0.0 13.81 60.1 0.0 06/27/2021 23:42:56 19 117 0.0 14.61 60.1 0.0 06/27/2021 23:43:16 21 123 0.0 15.32 60.1 0.0 06/27/2021 23:43:36 22 130 0.0 15.63 60.1 0.0 Page 54 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/27/2021 23:44:16 20 128 0.0 15.41 60.1 0.0 06/27/2021 23:44:36 21 120 0.0 15.95 60.1 0.0 06/27/2021 23:44:56 18 126 0.0 16.12 60.1 0.0 06/27/2021 23:45:16 89 136 0.0 15.79 60.1 0.0 06/27/2021 23:45:36 101 129 1.8 15.81 60.4 0.4 06/27/2021 23:45:56 217 161 2.5 15.75 61.1 1.1 06/27/2021 23:46:16 385 259 3.0 15.67 62.1 2.0 06/27/2021 23:46:36 373 248 3.0 15.69 63.1 3.0 06/27/2021 23:46:56 374 250 3.0 15.71 64.1 4.0 06/27/2021 23:47:16 376 237 3.0 15.72 65.1 5.0 06/27/2021 23:47:36 380 229 3.0 15.80 66.1 6.0 06/27/2021 23:47:56 311 208 2.7 15.92 67.0 6.9 06/27/2021 23:48:16 313 204 2.7 15.84 67.9 7.8 06/27/2021 23:48:36 269 195 2.7 15.77 68.8 8.7 06/27/2021 23:48:56 282 195 2.7 15.71 69.7 9.6 06/27/2021 23:49:16 270 189 2.7 15.75 70.6 10.5 06/27/2021 23:49:36 280 193 2.7 15.78 71.5 11.4 06/27/2021 23:49:56 270 187 2.8 15.80 72.4 12.3 06/27/2021 23:50:16 278 186 2.7 15.82 73.3 13.2 06/27/2021 23:50:36 275 169 2.8 15.85 74.2 14.2 06/27/2021 23:50:56 254 135 2.7 15.88 75.1 15.1 06/27/2021 23:51:16 267 130 2.7 15.90 76.0 16.0 06/27/2021 23:51:36 253 126 2.8 15.81 76.9 16.9 06/27/2021 23:51:56 261 132 2.7 15.77 77.9 17.8 06/27/2021 23:52:16 241 126 2.8 15.73 78.8 18.7 06/27/2021 23:52:36 245 124 2.8 15.74 79.7 19.6 06/27/2021 23:52:56 251 128 2.8 15.76 80.6 20.6 06/27/2021 23:53:16 241 122 2.8 15.77 81.5 21.5 06/27/2021 23:53:36 252 124 2.8 15.79 82.5 22.4 06/27/2021 23:53:56 244 126 2.8 15.80 83.4 23.3 06/27/2021 23:54:16 248 130 2.8 15.80 84.3 24.3 06/27/2021 23:54:36 248 128 2.8 15.80 85.2 25.2 06/27/2021 23:54:56 116 98 2.8 15.80 86.2 26.1 06/27/2021 23:55:16 114 97 2.8 15.79 87.1 27.0 06/27/2021 23:55:36 261 129 2.8 15.78 88.0 28.0 06/27/2021 23:55:56 249 124 2.8 15.79 89.0 28.9 06/27/2021 23:56:16 244 127 2.8 15.81 89.9 29.8 06/27/2021 23:56:36 235 125 2.8 15.82 90.8 30.8 06/27/2021 23:56:56 246 125 2.8 15.81 91.7 31.7 06/27/2021 23:57:16 249 127 2.8 15.81 92.7 32.6 06/27/2021 23:57:36 259 128 2.8 15.81 93.6 33.5 06/27/2021 23:57:56 236 128 2.8 15.81 94.5 34.5 06/27/2021 23:58:16 236 127 2.8 15.80 95.4 35.4 06/27/2021 23:58:36 250 126 2.8 15.81 96.4 36.3 06/27/2021 23:58:56 248 123 2.8 15.82 97.3 37.2 06/27/2021 23:59:16 260 128 2.8 15.83 98.2 38.2 06/27/2021 23:59:36 299 150 2.8 15.84 99.1 39.1 06/27/2021 23:59:56 255 129 2.8 15.84 100.1 40.0 06/28/2021 00:00:16 256 122 2.8 15.82 101.0 40.9 06/28/2021 00:00:36 249 128 2.8 15.80 101.9 41.9 06/28/2021 00:00:56 239 123 2.8 15.81 102.8 42.8 06/28/2021 00:01:16 251 124 2.8 15.82 103.8 43.7 06/28/2021 00:01:36 245 127 2.8 15.83 104.7 44.6 06/28/2021 00:01:56 247 128 2.8 15.85 105.6 45.6 Page 55 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 00:02:36 255 129 2.8 15.87 107.5 47.4 06/28/2021 00:02:56 255 127 2.8 15.85 108.4 48.3 06/28/2021 00:03:16 250 125 2.8 15.82 109.3 49.3 06/28/2021 00:03:36 233 128 2.8 15.78 110.2 50.2 06/28/2021 00:03:56 246 126 2.8 15.76 111.2 51.1 06/28/2021 00:04:16 249 125 2.8 15.74 112.1 52.0 06/28/2021 00:04:36 250 127 2.8 15.75 113.0 53.0 06/28/2021 00:04:56 239 129 2.8 15.74 113.9 53.9 06/28/2021 00:05:16 231 125 2.8 15.72 114.9 54.8 06/28/2021 00:05:36 235 127 2.8 15.70 115.8 55.7 06/28/2021 00:05:56 221 103 2.8 15.68 116.7 56.7 06/28/2021 00:06:16 243 173 2.8 15.66 117.7 57.6 06/28/2021 00:06:36 142 151 2.8 15.92 118.6 58.6 06/28/2021 00:06:56 164 140 2.8 16.10 119.5 59.5 06/28/2021 00:07:16 156 139 2.8 16.10 120.5 60.4 06/28/2021 00:07:36 29 132 0.0 16.10 121.1 61.1 06/28/2021 00:07:56 35 152 0.0 16.11 121.1 61.1 06/28/2021 00:08:16 33 146 0.0 15.98 121.1 61.1 06/28/2021 00:08:36 32 153 0.0 12.64 121.1 61.1 06/28/2021 00:08:56 33 125 0.0 12.21 121.1 61.1 06/28/2021 00:09:16 31 137 0.0 12.16 121.1 61.1 06/28/2021 00:09:36 33 151 0.0 12.15 121.1 61.1 06/28/2021 00:09:56 28 123 0.0 12.14 121.1 61.1 06/28/2021 00:10:16 28 143 0.0 12.13 121.1 61.1 06/28/2021 00:10:32 25 137 0.0 12.13 121.1 61.1 Reset Total, Vol = 61.09 bbl 06/28/2021 00:10:36 25 127 0.0 12.12 121.1 0.0 06/28/2021 00:10:53 27 133 0.0 12.11 121.1 0.0 WATER BEHIND 20 BBLS 06/28/2021 00:10:56 250 166 0.7 12.11 121.1 0.0 06/28/2021 00:11:16 182 165 1.8 12.08 121.7 0.5 06/28/2021 00:11:36 110 159 2.9 12.05 122.5 1.4 06/28/2021 00:11:56 210 147 3.5 12.02 123.6 2.5 06/28/2021 00:12:16 117 118 3.7 11.98 124.9 3.7 06/28/2021 00:12:36 124 120 3.7 11.93 126.1 4.9 06/28/2021 00:12:56 198 142 3.7 11.89 127.3 6.2 06/28/2021 00:13:16 170 139 3.5 11.85 128.5 7.4 06/28/2021 00:13:56 150 141 3.5 11.78 130.8 9.7 06/28/2021 00:14:36 135 124 3.5 11.71 133.2 12.0 06/28/2021 00:14:56 124 132 3.5 11.65 134.3 13.2 06/28/2021 00:15:16 194 149 3.5 11.60 135.5 14.3 06/28/2021 00:15:36 135 138 3.5 11.53 136.6 15.5 06/28/2021 00:15:56 160 138 3.5 11.47 137.8 16.7 06/28/2021 00:16:16 100 131 3.5 11.41 138.9 17.8 06/28/2021 00:16:36 144 126 3.5 11.35 140.1 19.0 06/28/2021 00:16:56 19 121 0.1 11.30 141.2 20.0 06/28/2021 00:17:16 13 114 0.0 11.26 141.2 20.0 06/28/2021 00:17:36 3 110 0.0 11.21 141.2 20.0 06/28/2021 00:17:56 -2 113 0.0 11.17 141.2 20.0 06/28/2021 00:18:16 -3 121 0.0 11.13 141.2 20.0 06/28/2021 00:18:36 1 155 0.0 11.10 141.2 20.0 06/28/2021 00:18:56 4 160 0.0 11.06 141.2 20.0 06/28/2021 00:19:16 6 162 0.0 11.03 141.2 20.0 06/28/2021 00:19:36 7 164 0.0 11.00 141.2 20.0 06/28/2021 00:19:56 75 168 0.0 10.96 141.2 20.0 06/28/2021 00:20:16 104 140 0.0 10.93 141.2 20.0 Page 56 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 00:20:56 134 124 0.0 10.87 141.2 20.0 06/28/2021 00:21:16 87 124 0.0 10.84 141.2 20.0 06/28/2021 00:21:36 4 122 0.0 10.80 141.2 20.0 06/28/2021 00:21:56 -4 124 0.0 10.78 141.2 20.0 06/28/2021 00:22:16 1 122 0.0 10.75 141.2 20.0 06/28/2021 00:22:36 -12 124 0.0 10.73 141.2 20.0 06/28/2021 00:22:47 -12 121 0.0 10.72 141.2 20.0 Reset Total, Vol = 20.04 bbl 06/28/2021 00:22:56 -10 123 0.0 10.71 141.2 0.0 06/28/2021 00:23:16 -8 123 0.0 10.68 141.2 0.0 06/28/2021 00:23:36 -8 121 0.0 10.65 141.2 0.0 06/28/2021 00:23:56 -10 135 0.0 10.63 141.2 0.0 06/28/2021 00:24:16 -9 133 0.0 10.60 141.2 0.0 06/28/2021 00:24:36 -9 138 0.0 8.30 141.2 0.0 06/28/2021 00:24:56 -9 136 0.0 8.30 141.2 0.0 06/28/2021 00:25:16 -10 134 0.0 8.30 141.2 0.0 06/28/2021 00:25:36 -10 134 0.0 8.78 141.2 0.0 06/28/2021 00:25:56 -8 133 0.0 8.60 141.2 0.0 06/28/2021 00:26:16 -9 134 0.0 8.60 141.2 0.0 06/28/2021 00:26:36 -12 134 0.0 8.91 141.2 0.0 06/28/2021 00:26:56 -9 136 0.0 9.72 141.2 0.0 06/28/2021 00:27:16 -10 133 0.0 10.39 141.2 0.0 06/28/2021 00:27:36 -10 136 0.0 11.51 141.2 0.0 06/28/2021 00:27:56 -10 136 0.0 11.97 141.2 0.0 06/28/2021 00:28:16 -9 137 0.0 12.05 141.2 0.0 06/28/2021 00:28:36 -9 138 0.0 12.05 141.2 0.0 06/28/2021 00:28:56 -9 139 0.0 12.06 141.2 0.0 06/28/2021 00:29:16 -10 138 0.0 12.06 141.2 0.0 06/28/2021 00:29:36 -8 138 0.0 12.05 141.2 0.0 06/28/2021 00:29:56 -9 154 0.0 12.06 141.2 0.0 06/28/2021 00:30:16 -12 151 0.0 12.05 141.2 0.0 06/28/2021 00:30:36 -11 152 0.0 12.04 141.2 0.0 06/28/2021 00:30:56 -8 154 0.0 12.02 141.2 0.0 06/28/2021 00:31:16 -11 151 0.0 11.93 141.2 0.0 06/28/2021 00:31:36 -9 149 0.0 11.87 141.2 0.0 06/28/2021 00:31:56 -12 154 0.0 11.82 141.2 0.0 06/28/2021 00:32:16 -12 152 0.0 11.83 141.2 0.0 06/28/2021 00:32:36 -10 150 0.0 11.83 141.2 0.0 06/28/2021 00:32:56 -10 149 0.0 11.71 141.2 0.0 06/28/2021 00:33:16 -10 155 0.0 11.70 141.2 0.0 06/28/2021 00:33:36 -8 152 0.0 11.69 141.2 0.0 06/28/2021 00:33:56 -9 152 0.0 11.45 141.2 0.0 06/28/2021 00:34:16 -10 156 0.0 11.09 141.2 0.0 06/28/2021 00:34:36 -9 150 0.0 10.91 141.2 0.0 06/28/2021 00:34:56 -12 153 0.0 10.84 141.2 0.0 06/28/2021 00:35:16 -11 155 0.0 10.68 141.2 0.0 06/28/2021 00:35:36 -9 151 0.0 10.82 141.2 0.0 06/28/2021 00:35:56 -11 151 0.0 10.84 141.2 0.0 06/28/2021 00:36:16 -11 155 0.0 10.73 141.2 0.0 06/28/2021 00:36:36 -11 152 0.0 10.54 141.2 0.0 06/28/2021 00:36:56 -10 151 0.0 10.38 141.2 0.0 06/28/2021 00:37:16 -12 158 0.0 10.20 141.2 0.0 06/28/2021 00:37:36 -9 155 0.0 8.87 141.2 0.0 06/28/2021 00:37:56 -11 151 0.0 8.84 141.2 0.0 06/28/2021 00:38:16 -9 154 0.0 8.85 141.2 0.0 Page 57 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 00:38:56 -8 155 0.0 8.65 141.2 0.0 06/28/2021 00:39:16 -13 153 0.0 8.58 141.2 0.0 06/28/2021 00:39:36 -11 155 0.0 8.52 141.2 0.0 06/28/2021 00:39:56 -10 153 0.0 8.49 141.2 0.0 06/28/2021 00:40:16 -9 150 0.0 8.45 141.2 0.0 06/28/2021 00:40:36 -13 156 0.0 8.43 141.2 0.0 06/28/2021 00:40:56 -8 152 0.0 8.40 141.2 0.0 06/28/2021 00:41:16 -9 152 0.0 8.42 141.2 0.0 06/28/2021 00:41:36 -12 155 0.0 8.38 141.2 0.0 06/28/2021 00:41:56 -12 158 0.0 8.38 141.2 0.0 06/28/2021 00:42:16 -11 153 0.0 8.36 141.2 0.0 06/28/2021 00:42:36 -10 159 0.0 8.38 141.2 0.0 06/28/2021 00:42:56 -9 157 0.0 8.26 141.2 0.0 06/28/2021 00:43:16 -11 159 0.0 8.11 141.2 0.0 06/28/2021 00:43:36 -9 156 0.0 7.92 141.2 0.0 06/28/2021 00:43:56 -10 159 0.0 7.74 141.2 0.0 06/28/2021 00:44:16 -13 157 0.0 7.51 141.2 0.0 06/28/2021 00:44:36 -12 153 0.0 7.28 141.2 0.0 06/28/2021 00:44:56 -9 160 0.0 8.28 141.2 0.0 06/28/2021 00:45:16 -13 156 0.0 8.27 141.2 0.0 06/28/2021 00:45:36 -10 153 0.0 8.27 141.2 0.0 06/28/2021 00:45:56 -11 159 0.0 8.27 141.2 0.0 06/28/2021 00:46:16 -13 155 0.0 8.27 141.2 0.0 06/28/2021 00:46:36 -13 153 0.0 8.06 141.2 0.0 06/28/2021 00:46:56 -9 158 0.0 7.84 141.2 0.0 06/28/2021 00:47:16 -11 156 0.0 7.65 141.2 0.0 06/28/2021 00:47:36 -14 152 0.0 7.47 141.2 0.0 06/28/2021 00:47:56 -12 156 0.0 7.31 141.2 0.0 06/28/2021 00:48:16 -9 155 0.0 7.13 141.2 0.0 06/28/2021 00:48:36 -11 155 0.0 6.97 141.2 0.0 06/28/2021 00:48:56 -13 154 0.0 6.82 141.2 0.0 06/28/2021 00:49:16 -12 159 0.0 6.66 141.2 0.0 06/28/2021 00:49:36 -11 154 0.0 6.54 141.2 0.0 06/28/2021 00:49:56 -11 153 0.0 6.44 141.2 0.0 06/28/2021 00:50:16 -14 155 0.0 6.32 141.2 0.0 06/28/2021 00:50:36 -9 151 0.0 6.24 141.2 0.0 06/28/2021 00:50:56 -12 148 0.0 6.17 141.2 0.0 06/28/2021 00:51:16 -14 154 0.0 6.11 141.2 0.0 06/28/2021 00:51:36 -13 153 0.0 6.06 141.2 0.0 06/28/2021 00:51:56 -4 151 0.0 6.00 141.2 0.0 06/28/2021 00:52:16 -2 154 0.0 5.96 141.2 0.0 06/28/2021 00:52:36 9 151 0.0 5.92 141.2 0.0 06/28/2021 00:52:56 28 151 0.0 5.88 141.8 0.6 06/28/2021 00:53:16 148 153 0.0 5.85 141.8 0.6 06/28/2021 00:53:36 151 154 0.0 5.83 141.8 0.6 06/28/2021 00:53:56 151 151 0.0 5.79 141.8 0.6 06/28/2021 00:54:16 144 149 0.0 5.74 141.8 0.6 06/28/2021 00:54:36 140 154 0.0 5.71 141.8 0.6 06/28/2021 00:54:56 40 155 0.0 5.68 141.8 0.6 06/28/2021 00:55:16 34 152 0.0 5.66 141.8 0.6 06/28/2021 00:55:36 101 155 0.0 5.63 141.8 0.6 06/28/2021 00:55:56 128 157 0.0 5.61 141.8 0.6 06/28/2021 00:56:16 168 149 0.0 5.59 141.8 0.6 06/28/2021 00:56:36 167 157 0.0 5.58 141.8 0.6 Page 58 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 00:57:16 98 153 0.0 5.55 141.8 0.6 06/28/2021 00:57:36 17 153 0.0 5.52 141.8 0.6 06/28/2021 00:57:56 11 154 0.0 5.51 141.8 0.6 06/28/2021 00:58:16 2 150 0.0 5.49 141.8 0.6 06/28/2021 00:58:36 -3 153 0.0 5.47 141.8 0.6 06/28/2021 00:58:56 -5 155 0.0 5.46 141.8 0.6 06/28/2021 00:59:16 -6 152 0.0 5.44 141.8 0.6 06/28/2021 00:59:36 -5 152 0.0 5.43 141.8 0.6 06/28/2021 00:59:56 -4 153 0.0 5.42 141.8 0.6 06/28/2021 01:00:16 5 149 0.0 5.41 141.8 0.6 06/28/2021 01:00:36 1445 151 0.0 5.40 141.8 0.6 06/28/2021 01:00:56 17 152 0.0 5.39 141.8 0.6 06/28/2021 01:01:16 14 154 0.0 5.38 141.8 0.6 06/28/2021 01:01:36 96 150 0.0 5.37 141.8 0.6 06/28/2021 01:01:56 87 154 0.0 5.37 141.8 0.6 06/28/2021 01:02:16 85 153 0.0 5.36 141.8 0.6 06/28/2021 01:02:36 85 151 0.0 5.36 141.8 0.6 06/28/2021 01:02:56 83 155 0.0 5.35 141.8 0.6 06/28/2021 01:03:16 80 154 0.0 5.34 141.8 0.6 06/28/2021 01:03:36 3 148 0.0 5.34 141.8 0.6 06/28/2021 01:03:56 -6 151 0.0 5.33 141.8 0.6 06/28/2021 01:04:16 -6 153 0.0 5.33 141.8 0.6 06/28/2021 01:04:36 -8 152 0.0 5.34 141.8 0.6 06/28/2021 01:04:56 -7 147 0.0 5.37 141.8 0.6 06/28/2021 01:05:16 -7 154 0.0 5.36 141.8 0.6 06/28/2021 01:05:36 -10 151 0.0 5.35 141.8 0.6 06/28/2021 01:05:56 -7 150 0.0 5.34 141.8 0.6 06/28/2021 01:06:16 -5 154 0.0 5.35 141.8 0.6 06/28/2021 01:06:36 -9 153 0.0 5.35 141.8 0.6 06/28/2021 01:06:56 -9 151 0.0 5.33 141.8 0.6 06/28/2021 01:07:16 -7 156 0.0 5.32 141.8 0.6 06/28/2021 01:07:36 -8 153 0.0 5.32 141.8 0.6 06/28/2021 01:07:56 -8 155 0.0 5.32 141.8 0.6 06/28/2021 01:08:16 -9 158 0.0 5.31 141.8 0.6 06/28/2021 01:08:36 -8 156 0.0 5.31 141.8 0.6 06/28/2021 01:08:56 -9 158 0.0 5.30 141.8 0.6 06/28/2021 01:09:16 -7 162 0.0 5.30 141.8 0.6 06/28/2021 01:09:36 -8 170 0.0 5.29 141.8 0.6 06/28/2021 01:09:56 -11 162 0.0 5.28 141.8 0.6 06/28/2021 01:10:16 -8 146 0.0 5.28 141.8 0.6 06/28/2021 01:10:36 -6 164 0.0 5.28 141.8 0.6 06/28/2021 01:10:56 -6 182 0.0 5.27 141.8 0.6 06/28/2021 01:11:16 -9 205 0.0 5.26 141.8 0.6 06/28/2021 01:11:36 -9 276 0.0 5.26 141.8 0.6 06/28/2021 01:11:56 -10 248 0.0 5.26 141.8 0.6 06/28/2021 01:12:16 -9 244 0.0 5.26 141.8 0.6 06/28/2021 01:12:36 -12 229 0.0 5.25 141.8 0.6 06/28/2021 01:12:56 -9 200 0.0 5.26 141.8 0.6 06/28/2021 01:13:16 -13 220 0.0 5.25 141.8 0.6 06/28/2021 01:13:36 -9 239 0.0 5.25 141.8 0.6 06/28/2021 01:13:56 5 262 0.0 5.25 141.8 0.6 06/28/2021 01:14:16 -3 228 0.0 5.25 141.8 0.6 06/28/2021 01:14:36 -3 222 0.0 5.25 141.8 0.6 06/28/2021 01:14:56 0 263 0.0 5.25 141.8 0.6 Page 59 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 01:15:36 -1 269 0.0 5.24 141.8 0.6 06/28/2021 01:15:56 -1 282 0.0 5.24 141.8 0.6 06/28/2021 01:16:16 -1 265 0.0 5.24 141.8 0.6 06/28/2021 01:16:36 -2 251 0.0 5.24 141.8 0.6 06/28/2021 01:16:56 7 302 0.0 5.24 141.8 0.6 06/28/2021 01:17:16 11 273 0.0 5.24 141.8 0.6 06/28/2021 01:17:36 1 250 0.0 5.23 141.8 0.6 06/28/2021 01:17:56 -2 254 0.0 5.24 141.8 0.6 06/28/2021 01:18:16 -0 225 0.0 5.23 141.8 0.6 06/28/2021 01:18:36 -1 174 0.0 5.23 141.8 0.6 06/28/2021 01:18:56 -2 175 0.0 5.23 141.8 0.6 06/28/2021 01:19:16 -2 176 0.0 5.23 141.8 0.6 06/28/2021 01:19:36 -2 167 0.0 5.23 141.8 0.6 06/28/2021 01:19:56 -1 162 0.0 5.23 141.8 0.6 06/28/2021 01:20:16 -4 161 0.0 5.22 141.8 0.6 06/28/2021 01:20:36 -2 178 0.0 5.23 141.8 0.6 06/28/2021 01:20:56 -3 168 0.0 5.23 141.8 0.6 06/28/2021 01:21:16 -1 170 0.0 5.23 141.8 0.6 06/28/2021 01:21:36 2 169 0.0 5.23 141.8 0.6 06/28/2021 01:21:56 -4 162 0.0 5.22 141.8 0.6 06/28/2021 01:22:16 -2 170 0.0 5.22 141.8 0.6 06/28/2021 01:22:36 -2 165 0.0 5.22 141.8 0.6 06/28/2021 01:22:56 -1 159 0.0 5.22 141.8 0.6 06/28/2021 01:23:16 2 161 0.0 5.22 141.8 0.6 06/28/2021 01:23:36 3 175 0.0 5.21 141.8 0.6 06/28/2021 01:23:56 -1 167 0.0 5.21 141.8 0.6 06/28/2021 01:24:16 1 181 0.0 5.21 141.8 0.6 06/28/2021 01:24:36 -1 173 0.0 5.21 141.8 0.6 06/28/2021 01:24:56 -0 161 0.0 5.21 141.8 0.6 06/28/2021 01:25:16 1 168 0.0 5.21 141.8 0.6 06/28/2021 01:25:36 0 163 0.0 5.21 141.8 0.6 06/28/2021 01:25:56 1 175 0.0 5.21 141.8 0.6 06/28/2021 01:26:16 0 179 0.0 5.21 141.8 0.6 06/28/2021 01:26:36 -2 154 0.0 5.21 141.8 0.6 06/28/2021 01:26:56 -2 173 0.0 5.21 141.8 0.6 06/28/2021 01:27:16 -0 164 0.0 5.21 141.8 0.6 06/28/2021 01:27:36 2 173 0.0 5.20 141.8 0.6 06/28/2021 01:27:56 -1 173 0.0 5.21 141.8 0.6 06/28/2021 01:28:16 -3 167 0.0 5.20 141.8 0.6 06/28/2021 01:28:36 -1 170 0.0 5.21 141.8 0.6 06/28/2021 01:28:56 -3 157 0.0 5.21 141.8 0.6 06/28/2021 01:29:16 -0 182 0.0 5.21 141.8 0.6 06/28/2021 01:29:36 -3 180 0.0 5.20 141.8 0.6 06/28/2021 01:29:56 -0 174 0.0 5.20 141.8 0.6 06/28/2021 01:30:16 1 185 0.0 5.20 141.8 0.6 06/28/2021 01:30:36 1 171 0.0 5.20 141.8 0.6 06/28/2021 01:30:56 -1 169 0.0 5.20 141.8 0.6 06/28/2021 01:31:16 -0 168 0.0 5.20 141.8 0.6 06/28/2021 01:31:36 -2 174 0.0 5.20 141.8 0.6 06/28/2021 01:31:56 1 186 0.0 5.19 141.8 0.6 06/28/2021 01:32:16 -2 177 0.0 5.20 141.8 0.6 06/28/2021 01:32:36 -2 171 0.0 5.20 141.8 0.6 06/28/2021 01:32:56 -1 177 0.0 5.20 141.8 0.6 06/28/2021 01:33:16 1 171 0.0 5.19 141.8 0.6 Page 60 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 01:33:56 -1 169 0.0 5.19 141.8 0.6 06/28/2021 01:34:16 3 171 0.0 5.19 141.8 0.6 06/28/2021 01:34:36 -0 173 0.0 5.19 141.8 0.6 06/28/2021 01:34:56 -2 178 0.0 5.19 141.8 0.6 06/28/2021 01:35:16 -2 162 0.0 5.19 141.8 0.6 06/28/2021 01:35:36 -2 175 0.0 5.18 141.8 0.6 06/28/2021 01:35:56 -1 170 0.0 5.18 141.8 0.6 06/28/2021 01:36:16 -1 185 0.0 5.19 141.8 0.6 06/28/2021 01:36:36 1 185 0.0 5.18 141.8 0.6 06/28/2021 01:36:56 -0 170 0.0 5.18 141.8 0.6 06/28/2021 01:37:16 -3 177 0.0 5.18 141.8 0.6 06/28/2021 01:37:36 -0 171 0.0 5.18 141.8 0.6 06/28/2021 01:37:56 0 173 0.0 5.19 141.8 0.6 06/28/2021 01:38:16 0 183 0.0 5.18 141.8 0.6 06/28/2021 01:38:36 0 183 0.0 5.18 141.8 0.6 06/28/2021 01:38:56 -0 169 0.0 5.18 141.8 0.6 06/28/2021 01:39:16 -1 175 0.0 5.18 141.8 0.6 06/28/2021 01:39:36 1 184 0.0 5.18 141.8 0.6 06/28/2021 01:39:56 -0 168 0.0 5.18 141.8 0.6 06/28/2021 01:40:16 2 164 0.0 5.18 141.8 0.6 06/28/2021 01:40:36 1 186 0.0 5.18 141.8 0.6 06/28/2021 01:40:56 -2 165 0.0 5.18 141.8 0.6 06/28/2021 01:41:16 -1 174 0.0 5.18 141.8 0.6 06/28/2021 01:41:36 -4 160 0.0 5.18 141.8 0.6 06/28/2021 01:41:56 7 215 0.0 5.18 141.8 0.6 06/28/2021 01:42:16 -5 165 0.0 5.18 141.8 0.6 06/28/2021 01:42:36 -4 167 0.0 5.17 141.8 0.6 06/28/2021 01:42:56 -3 172 0.0 5.17 141.8 0.6 06/28/2021 01:43:16 -2 173 0.0 5.17 141.8 0.6 06/28/2021 01:43:36 -3 176 0.0 5.18 141.8 0.6 06/28/2021 01:43:56 1 172 0.0 5.17 141.8 0.6 06/28/2021 01:44:16 -0 171 0.0 5.17 141.8 0.6 06/28/2021 01:44:36 -1 158 0.0 5.17 141.8 0.6 06/28/2021 01:44:56 -1 176 0.0 5.17 141.8 0.6 06/28/2021 01:45:16 -1 167 0.0 5.17 141.8 0.6 06/28/2021 01:45:36 1 180 0.0 5.17 141.8 0.6 06/28/2021 01:45:56 -3 163 0.0 5.17 141.8 0.6 06/28/2021 01:46:16 0 172 0.0 5.17 141.8 0.6 06/28/2021 01:46:36 -2 161 0.0 5.17 141.8 0.6 06/28/2021 01:46:56 -3 168 0.0 5.17 141.8 0.6 06/28/2021 01:47:16 -2 174 0.0 5.15 141.8 0.6 06/28/2021 01:47:36 -1 179 0.0 5.15 141.8 0.6 06/28/2021 01:47:56 -3 166 0.0 5.15 141.8 0.6 06/28/2021 01:48:16 -3 172 0.0 5.15 141.8 0.6 06/28/2021 01:48:36 -2 163 0.0 5.15 141.8 0.6 06/28/2021 01:48:56 -3 171 0.0 5.15 141.8 0.6 06/28/2021 01:49:16 -1 176 0.0 5.15 141.8 0.6 06/28/2021 01:49:36 -3 159 0.0 5.15 141.8 0.6 06/28/2021 01:49:56 -1 170 0.0 5.15 141.8 0.6 06/28/2021 01:50:16 -1 174 0.0 5.15 141.8 0.6 06/28/2021 01:50:36 -1 177 0.0 5.15 141.8 0.6 06/28/2021 01:50:56 1 175 0.0 5.14 141.8 0.6 06/28/2021 01:51:16 -1 166 0.0 5.14 141.8 0.6 06/28/2021 01:51:36 -2 171 0.0 5.14 141.8 0.6 Page 61 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 01:52:16 1 172 0.0 5.14 141.8 0.6 06/28/2021 01:52:36 -11 136 0.0 5.15 141.8 0.6 06/28/2021 01:52:56 -7 135 0.0 5.14 141.8 0.6 06/28/2021 01:53:16 -12 135 0.0 5.15 141.8 0.6 06/28/2021 01:53:36 -9 135 0.0 5.14 141.8 0.6 06/28/2021 01:53:56 -10 135 0.0 5.14 141.8 0.6 06/28/2021 01:54:16 -12 133 0.0 5.15 141.8 0.6 06/28/2021 01:54:36 -8 137 0.0 5.14 141.8 0.6 06/28/2021 01:54:56 -7 141 0.0 5.15 141.8 0.6 06/28/2021 01:55:16 -10 137 0.0 5.14 141.8 0.6 06/28/2021 01:55:36 -11 143 0.0 5.14 141.8 0.6 06/28/2021 01:55:56 -11 146 0.0 5.14 141.8 0.6 06/28/2021 01:56:16 -8 151 0.0 5.14 141.8 0.6 06/28/2021 01:56:36 -10 143 0.0 5.14 141.8 0.6 06/28/2021 01:56:56 -10 148 0.0 5.14 141.8 0.6 06/28/2021 01:57:16 -8 153 0.0 5.14 141.8 0.6 06/28/2021 01:57:36 -10 152 0.0 5.14 141.8 0.6 06/28/2021 01:57:56 -10 152 0.0 5.14 141.8 0.6 06/28/2021 01:58:16 -10 158 0.0 5.14 141.8 0.6 06/28/2021 01:58:36 -8 160 0.0 5.14 141.8 0.6 06/28/2021 01:58:56 -10 160 0.0 5.14 141.8 0.6 06/28/2021 01:59:16 -10 159 0.0 5.14 141.8 0.6 06/28/2021 01:59:36 -7 163 0.0 5.14 141.8 0.6 06/28/2021 01:59:56 -12 167 0.0 5.14 141.8 0.6 06/28/2021 02:00:16 -6 167 0.0 5.13 141.8 0.6 06/28/2021 02:00:36 -3 215 0.0 5.13 141.8 0.6 06/28/2021 02:00:56 -1 224 0.0 5.14 141.8 0.6 06/28/2021 02:01:16 -2 202 0.0 5.13 141.8 0.6 06/28/2021 02:01:36 -3 202 0.0 5.13 141.8 0.6 06/28/2021 02:01:56 -3 218 0.0 5.13 141.8 0.6 06/28/2021 02:02:16 -3 219 0.0 5.13 141.8 0.6 06/28/2021 02:02:36 -3 208 0.0 5.14 141.8 0.6 06/28/2021 02:02:56 -0 233 0.0 5.13 141.8 0.6 06/28/2021 02:03:16 -5 222 0.0 5.13 141.8 0.6 06/28/2021 02:03:36 -1 229 0.0 5.14 141.8 0.6 06/28/2021 02:03:56 -3 227 0.0 5.13 141.8 0.6 06/28/2021 02:04:16 -5 229 0.0 5.14 141.8 0.6 06/28/2021 02:04:36 -1 244 0.0 5.13 141.8 0.6 06/28/2021 02:04:56 -2 241 0.0 5.13 141.8 0.6 06/28/2021 02:05:16 -2 237 0.0 5.14 141.8 0.6 06/28/2021 02:05:36 -3 251 0.0 5.13 141.8 0.6 06/28/2021 02:05:56 -4 250 0.0 5.13 141.8 0.6 06/28/2021 02:06:16 -2 273 0.0 5.13 141.8 0.6 06/28/2021 02:06:36 -1 238 0.0 5.13 141.8 0.6 06/28/2021 02:06:56 -1 237 0.0 5.14 141.8 0.6 06/28/2021 02:07:16 -4 256 0.0 5.13 141.8 0.6 06/28/2021 02:07:36 -5 260 0.0 5.13 141.8 0.6 06/28/2021 02:07:56 -4 276 0.0 5.13 141.8 0.6 06/28/2021 02:08:16 -2 312 0.0 5.13 141.8 0.6 06/28/2021 02:08:36 0 355 0.0 5.13 141.8 0.6 06/28/2021 02:08:56 -3 560 0.0 5.13 141.8 0.6 06/28/2021 02:09:16 -3 846 0.0 5.13 141.8 0.6 06/28/2021 02:09:36 11 980 0.0 5.12 141.8 0.6 06/28/2021 02:09:56 7 977 0.0 5.13 141.8 0.6 Page 62 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 02:10:36 -7 749 0.0 5.13 141.8 0.6 06/28/2021 02:10:56 13 761 0.0 5.13 141.8 0.6 06/28/2021 02:11:16 2 597 0.0 5.12 141.8 0.6 06/28/2021 02:11:36 -3 565 0.0 5.12 141.8 0.6 06/28/2021 02:11:56 2 600 0.0 5.13 141.8 0.6 06/28/2021 02:12:16 -1 563 0.0 5.13 141.8 0.6 06/28/2021 02:12:36 -4 524 0.0 5.13 141.8 0.6 06/28/2021 02:12:56 -4 478 0.0 5.12 141.8 0.6 06/28/2021 02:13:16 -1 474 0.0 5.13 141.8 0.6 06/28/2021 02:13:36 -4 454 0.0 5.13 141.8 0.6 06/28/2021 02:13:56 -1 444 0.0 5.12 141.8 0.6 06/28/2021 02:14:16 -7 440 0.0 5.12 141.8 0.6 06/28/2021 02:14:36 -5 423 0.0 5.12 141.8 0.6 06/28/2021 02:14:56 -2 420 0.0 5.12 141.8 0.6 06/28/2021 02:15:16 -2 397 0.0 5.12 141.8 0.6 06/28/2021 02:15:36 -2 403 0.0 5.13 141.8 0.6 06/28/2021 02:15:56 -1 404 0.0 5.12 141.8 0.6 06/28/2021 02:16:16 -2 398 0.0 5.12 141.8 0.6 06/28/2021 02:16:36 -3 395 0.0 5.12 141.8 0.6 06/28/2021 02:16:56 1 432 0.0 5.12 141.8 0.6 06/28/2021 02:17:16 1 425 0.0 5.12 141.8 0.6 06/28/2021 02:17:36 5 467 0.0 5.12 141.8 0.6 06/28/2021 02:17:56 -1 461 0.0 5.12 141.8 0.6 06/28/2021 02:18:16 5 504 0.0 5.12 141.8 0.6 06/28/2021 02:18:36 5 457 0.0 5.12 141.8 0.6 06/28/2021 02:18:56 3 415 0.0 5.12 141.8 0.6 06/28/2021 02:19:16 -4 432 0.0 5.12 141.8 0.6 06/28/2021 02:19:36 6 476 0.0 5.12 141.8 0.6 06/28/2021 02:19:56 9 415 0.0 5.12 141.8 0.6 06/28/2021 02:20:16 -4 415 0.0 5.12 141.8 0.6 06/28/2021 02:20:36 1 449 0.0 5.12 141.8 0.6 06/28/2021 02:20:56 7 434 0.0 5.12 141.8 0.6 06/28/2021 02:21:16 3 393 0.0 5.12 141.8 0.6 06/28/2021 02:21:36 2 430 0.0 5.12 141.8 0.6 06/28/2021 02:21:56 8 437 0.0 5.12 141.8 0.6 06/28/2021 02:22:16 2 365 0.0 5.12 141.8 0.6 06/28/2021 02:22:36 14 430 0.0 5.12 141.8 0.6 06/28/2021 02:22:56 -7 333 0.0 5.12 141.8 0.6 06/28/2021 02:23:16 5 406 0.0 5.12 141.8 0.6 06/28/2021 02:23:36 -1 434 0.0 5.12 141.8 0.6 06/28/2021 02:23:56 -7 401 0.0 5.11 141.8 0.6 06/28/2021 02:24:16 -6 405 0.0 5.11 141.8 0.6 06/28/2021 02:24:36 -3 409 0.0 5.12 141.8 0.6 06/28/2021 02:24:56 -2 421 0.0 5.12 141.8 0.6 06/28/2021 02:25:16 -3 421 0.0 5.12 141.8 0.6 06/28/2021 02:25:36 10 458 0.0 5.12 141.8 0.6 06/28/2021 02:25:56 -3 355 0.0 5.12 141.8 0.6 06/28/2021 02:26:16 -4 440 0.0 5.12 141.8 0.6 06/28/2021 02:26:36 -3 434 0.0 5.12 141.8 0.6 06/28/2021 02:26:56 7 437 0.0 5.11 141.8 0.6 06/28/2021 02:27:16 9 409 0.0 5.11 141.8 0.6 06/28/2021 02:27:36 2 475 0.0 5.11 141.8 0.6 06/28/2021 02:27:56 2 415 0.0 5.11 141.8 0.6 06/28/2021 02:28:16 -1 373 0.0 5.11 141.8 0.6 Page 63 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 02:28:56 -5 363 0.0 5.11 141.8 0.6 06/28/2021 02:29:16 -3 409 0.0 5.11 141.8 0.6 06/28/2021 02:29:36 -3 459 0.0 5.11 141.8 0.6 06/28/2021 02:29:56 -2 503 0.0 5.11 141.8 0.6 06/28/2021 02:30:16 1 548 0.0 5.11 141.8 0.6 06/28/2021 02:30:36 -2 592 0.0 5.11 141.8 0.6 06/28/2021 02:30:56 -3 647 0.0 5.11 141.8 0.6 06/28/2021 02:31:16 -2 677 0.0 5.11 141.8 0.6 06/28/2021 02:31:36 -3 698 0.0 5.11 141.8 0.6 06/28/2021 02:31:56 -5 730 0.0 5.11 141.8 0.6 06/28/2021 02:32:16 -3 765 0.0 5.11 141.8 0.6 06/28/2021 02:32:36 1 783 0.0 5.11 141.8 0.6 06/28/2021 02:32:56 -6 823 0.0 5.11 141.8 0.6 06/28/2021 02:33:16 -2 847 0.0 5.11 141.8 0.6 06/28/2021 02:33:36 -3 856 0.0 5.11 141.8 0.6 06/28/2021 02:33:56 -3 878 0.0 5.11 141.8 0.6 06/28/2021 02:34:16 -1 900 0.0 5.11 141.8 0.6 06/28/2021 02:34:36 2 922 0.0 5.11 141.8 0.6 06/28/2021 02:34:56 -3 964 0.0 5.11 141.8 0.6 06/28/2021 02:35:16 -5 988 0.0 5.11 141.8 0.6 06/28/2021 02:35:36 -4 1035 0.0 5.11 141.8 0.6 06/28/2021 02:35:56 -6 1041 0.0 5.11 141.8 0.6 06/28/2021 02:36:16 -0 1073 0.0 5.11 141.8 0.6 06/28/2021 02:36:36 1 1087 0.0 5.11 141.8 0.6 06/28/2021 02:36:56 -5 1101 0.0 5.11 141.8 0.6 06/28/2021 02:37:16 -2 1136 0.0 5.11 141.8 0.6 06/28/2021 02:37:36 -5 1142 0.0 5.11 141.8 0.6 06/28/2021 02:37:56 -5 1168 0.0 5.11 141.8 0.6 06/28/2021 02:38:16 -3 1183 0.0 5.11 141.8 0.6 06/28/2021 02:38:36 -3 1186 0.0 5.11 141.8 0.6 06/28/2021 02:38:56 -6 1223 0.0 5.11 141.8 0.6 06/28/2021 02:39:16 -4 1250 0.0 5.11 141.8 0.6 06/28/2021 02:39:36 1 1264 0.0 5.11 141.8 0.6 06/28/2021 02:39:56 -1 1301 0.0 5.11 141.8 0.6 06/28/2021 02:40:16 -1 1332 0.0 5.11 141.8 0.6 06/28/2021 02:40:36 -4 1350 0.0 5.11 141.8 0.6 06/28/2021 02:40:56 -3 1391 0.0 5.11 141.8 0.6 06/28/2021 02:41:16 -2 1423 0.0 5.10 141.8 0.6 06/28/2021 02:41:36 -5 1423 0.0 5.10 141.8 0.6 06/28/2021 02:41:56 -6 1460 0.0 5.11 141.8 0.6 06/28/2021 02:42:16 -2 1491 0.0 5.11 141.8 0.6 06/28/2021 02:42:36 -3 1531 0.0 5.11 141.8 0.6 06/28/2021 02:42:56 -0 1565 0.0 5.10 141.8 0.6 06/28/2021 02:43:16 -3 1587 0.0 5.10 141.8 0.6 06/28/2021 02:43:36 -1 1614 0.0 5.10 141.8 0.6 06/28/2021 02:43:56 0 1669 0.0 5.11 141.8 0.6 06/28/2021 02:44:16 -8 1647 0.0 5.11 141.8 0.6 06/28/2021 02:44:36 -7 1619 0.0 5.10 141.8 0.6 06/28/2021 02:44:56 -10 1596 0.0 5.11 141.8 0.6 06/28/2021 02:45:16 -6 1573 0.0 5.11 141.8 0.6 06/28/2021 02:45:36 -7 1556 0.0 5.11 141.8 0.6 06/28/2021 02:45:56 -5 1522 0.0 5.11 141.8 0.6 06/28/2021 02:46:16 -10 1497 0.0 5.10 141.8 0.6 06/28/2021 02:46:36 -7 1495 0.0 5.10 141.8 0.6 Page 64 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 02:47:16 -7 1463 0.0 5.10 141.8 0.6 06/28/2021 02:47:36 -5 1453 0.0 5.10 141.8 0.6 06/28/2021 02:47:56 -1 1471 0.0 5.10 141.8 0.6 06/28/2021 02:48:16 -4 1463 0.0 5.10 141.8 0.6 06/28/2021 02:48:36 3 1461 0.0 5.10 141.8 0.6 06/28/2021 02:48:56 -0 1399 0.0 5.10 141.8 0.6 06/28/2021 02:49:16 -1 1424 0.0 5.10 141.8 0.6 06/28/2021 02:49:36 3 1377 0.0 5.10 141.8 0.6 06/28/2021 02:49:56 -1 1357 0.0 5.10 141.8 0.6 06/28/2021 02:50:16 -6 1353 0.0 5.10 141.8 0.6 06/28/2021 02:50:36 3 1357 0.0 5.10 141.8 0.6 06/28/2021 02:50:56 -0 1348 0.0 5.10 141.8 0.6 06/28/2021 02:51:16 4 1326 0.0 5.10 141.8 0.6 06/28/2021 02:51:36 0 1318 0.0 5.10 141.8 0.6 06/28/2021 02:51:56 4 1307 0.0 5.10 141.8 0.6 06/28/2021 02:52:16 3 1288 0.0 5.10 141.8 0.6 06/28/2021 02:52:36 -5 1306 0.0 5.10 141.8 0.6 06/28/2021 02:52:56 8 1308 0.0 5.10 141.8 0.6 06/28/2021 02:53:16 -3 1292 0.0 5.10 141.8 0.6 06/28/2021 02:53:36 -7 1290 0.0 5.10 141.8 0.6 06/28/2021 02:53:56 -8 1286 0.0 5.10 141.8 0.6 06/28/2021 02:54:16 -8 1270 0.0 5.10 141.8 0.6 06/28/2021 02:54:36 -8 1257 0.0 5.10 141.8 0.6 06/28/2021 02:54:56 7 1254 0.0 5.10 141.8 0.6 06/28/2021 02:55:16 -6 1174 0.0 5.10 141.8 0.6 06/28/2021 02:55:36 -9 1187 0.0 5.10 141.8 0.6 06/28/2021 02:55:56 -10 1201 0.0 5.10 141.8 0.6 06/28/2021 02:56:16 -10 1213 0.0 5.10 141.8 0.6 06/28/2021 02:56:36 -10 1198 0.0 5.10 141.8 0.6 06/28/2021 02:56:56 3 1207 0.0 5.10 141.8 0.6 06/28/2021 02:57:16 -1 1162 0.0 5.10 141.8 0.6 06/28/2021 02:57:36 -1 1198 0.0 5.10 141.8 0.6 06/28/2021 02:57:56 -9 1183 0.0 5.10 141.8 0.6 06/28/2021 02:58:16 -7 1190 0.0 5.10 141.8 0.6 06/28/2021 02:58:36 -9 1179 0.0 5.10 141.8 0.6 06/28/2021 02:58:56 -10 1171 0.0 5.10 141.8 0.6 06/28/2021 02:59:16 -9 1154 0.0 5.10 141.8 0.6 06/28/2021 02:59:36 -8 1162 0.0 5.10 141.8 0.6 06/28/2021 02:59:56 -6 1152 0.0 5.10 141.8 0.6 06/28/2021 03:00:16 -6 1159 0.0 5.10 141.8 0.6 06/28/2021 03:00:36 -6 1130 0.0 5.10 141.8 0.6 06/28/2021 03:00:56 13 1178 0.0 5.10 141.8 0.6 06/28/2021 03:01:16 5 1087 0.0 5.10 141.8 0.6 06/28/2021 03:01:36 2 1086 0.0 5.10 141.8 0.6 06/28/2021 03:01:56 -1 1142 0.0 5.10 141.8 0.6 06/28/2021 03:02:16 2 1124 0.0 5.10 141.8 0.6 06/28/2021 03:02:36 1 1081 0.0 5.10 141.8 0.6 06/28/2021 03:02:56 -5 1023 0.0 5.10 141.8 0.6 06/28/2021 03:03:16 3 1071 0.0 5.10 141.8 0.6 06/28/2021 03:03:36 4 1107 0.0 5.10 141.8 0.6 06/28/2021 03:03:56 5 1060 0.0 5.10 141.8 0.6 06/28/2021 03:04:16 -3 1044 0.0 5.10 141.8 0.6 06/28/2021 03:04:36 -9 1063 0.0 5.10 141.8 0.6 06/28/2021 03:04:56 5 1020 0.0 5.09 141.8 0.6 Page 65 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 03:05:36 -4 1050 0.0 5.10 141.8 0.6 06/28/2021 03:05:56 4 1049 0.0 5.10 141.8 0.6 06/28/2021 03:06:16 -7 956 0.0 5.10 141.8 0.6 06/28/2021 03:06:36 -7 1028 0.0 5.09 141.8 0.6 06/28/2021 03:06:56 3 1083 0.0 5.09 141.8 0.6 06/28/2021 03:07:16 4 1015 0.0 5.10 141.8 0.6 06/28/2021 03:07:36 5 1022 0.0 5.10 141.8 0.6 06/28/2021 03:07:56 -8 1041 0.0 5.09 141.8 0.6 06/28/2021 03:08:16 8 1037 0.0 5.10 141.8 0.6 06/28/2021 03:08:36 -7 964 0.0 5.09 141.8 0.6 06/28/2021 03:08:56 -7 1047 0.0 5.10 141.8 0.6 06/28/2021 03:09:16 4 1019 0.0 5.09 141.8 0.6 06/28/2021 03:09:36 -6 954 0.0 5.10 141.8 0.6 06/28/2021 03:09:56 -0 1047 0.0 5.09 141.8 0.6 06/28/2021 03:10:16 4 1084 0.0 5.10 141.8 0.6 06/28/2021 03:10:36 4 1031 0.0 5.09 141.8 0.6 06/28/2021 03:10:56 1 996 0.0 5.10 141.8 0.6 06/28/2021 03:11:16 6 1031 0.0 5.09 141.8 0.6 06/28/2021 03:11:36 -1 1057 0.0 5.09 141.8 0.6 06/28/2021 03:11:56 6 1083 0.0 5.09 141.8 0.6 06/28/2021 03:12:16 -2 1018 0.0 5.10 141.8 0.6 06/28/2021 03:12:36 -5 1027 0.0 5.09 141.8 0.6 06/28/2021 03:12:56 3 1089 0.0 5.09 141.8 0.6 06/28/2021 03:13:16 -1 1067 0.0 5.09 141.8 0.6 06/28/2021 03:13:36 -5 1051 0.0 5.09 141.8 0.6 06/28/2021 03:13:56 -4 1057 0.0 5.09 141.8 0.6 06/28/2021 03:14:16 -3 1065 0.0 5.09 141.8 0.6 06/28/2021 03:14:36 7 1067 0.0 5.09 141.8 0.6 06/28/2021 03:14:56 -6 1095 0.0 5.10 141.8 0.6 06/28/2021 03:15:16 -6 1072 0.0 5.10 141.8 0.6 06/28/2021 03:15:36 -11 1034 0.0 5.09 141.8 0.6 06/28/2021 03:15:56 -14 1080 0.0 5.09 141.8 0.6 06/28/2021 03:16:16 -7 1057 0.0 5.09 141.8 0.6 06/28/2021 03:16:36 -8 1052 0.0 5.10 141.8 0.6 06/28/2021 03:16:56 -6 1112 0.0 5.09 141.8 0.6 06/28/2021 03:17:16 -5 1058 0.0 5.09 141.8 0.6 06/28/2021 03:17:36 -6 1067 0.0 5.09 141.8 0.6 06/28/2021 03:17:56 -6 1069 0.0 5.09 141.8 0.6 06/28/2021 03:18:16 -5 1089 0.0 5.09 141.8 0.6 06/28/2021 03:18:36 -13 1034 0.0 5.09 141.8 0.6 06/28/2021 03:18:56 -10 1049 0.0 5.09 141.8 0.6 06/28/2021 03:19:16 -10 1048 0.0 5.09 141.8 0.6 06/28/2021 03:19:36 -9 1059 0.0 5.10 141.8 0.6 06/28/2021 03:19:56 -12 970 0.0 5.09 141.8 0.6 06/28/2021 03:20:16 -6 926 0.0 5.09 141.8 0.6 06/28/2021 03:20:36 -7 759 0.0 5.09 141.8 0.6 06/28/2021 03:20:56 -7 510 0.0 5.09 141.8 0.6 06/28/2021 03:21:16 -3 207 0.0 5.09 141.8 0.6 06/28/2021 03:21:36 -9 112 0.0 5.09 141.8 0.6 06/28/2021 03:21:56 -5 147 0.0 5.09 141.8 0.6 06/28/2021 03:22:16 -9 116 0.0 5.09 141.8 0.6 06/28/2021 03:22:36 -3 132 0.0 5.09 141.8 0.6 06/28/2021 03:22:56 -12 113 0.0 5.09 141.8 0.6 06/28/2021 03:23:16 -6 120 0.0 5.09 141.8 0.6 Page 66 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 03:23:56 -6 116 0.0 5.09 141.8 0.6 06/28/2021 03:24:16 -10 111 0.0 5.09 141.8 0.6 06/28/2021 03:24:36 -8 125 0.0 5.09 141.8 0.6 06/28/2021 03:24:56 -13 122 0.0 5.09 141.8 0.6 06/28/2021 03:25:16 -13 116 0.0 5.09 141.8 0.6 06/28/2021 03:25:36 -4 225 0.0 5.09 141.8 0.6 06/28/2021 03:25:56 -2 203 0.0 5.09 141.8 0.6 06/28/2021 03:26:16 -2 212 0.0 5.09 141.8 0.6 06/28/2021 03:26:36 -7 175 0.0 5.09 141.8 0.6 06/28/2021 03:26:56 -4 203 0.0 5.09 141.8 0.6 06/28/2021 03:27:16 -5 217 0.0 5.09 141.8 0.6 06/28/2021 03:27:36 -5 224 0.0 5.09 141.8 0.6 06/28/2021 03:27:56 -8 192 0.0 5.09 141.8 0.6 06/28/2021 03:28:16 -4 205 0.0 5.09 141.8 0.6 06/28/2021 03:28:36 -7 183 0.0 5.09 141.8 0.6 06/28/2021 03:28:56 -6 192 0.0 5.09 141.8 0.6 06/28/2021 03:29:16 -7 183 0.0 5.09 141.8 0.6 06/28/2021 03:29:36 -3 307 0.0 5.09 141.8 0.6 06/28/2021 03:29:56 -5 272 0.0 5.09 141.8 0.6 06/28/2021 03:30:16 -1 342 0.0 5.09 141.8 0.6 06/28/2021 03:30:36 -7 378 0.0 5.09 141.8 0.6 06/28/2021 03:30:56 -9 451 0.0 5.09 141.8 0.6 06/28/2021 03:31:36 -3 585 0.0 5.09 141.8 0.6 06/28/2021 03:31:36 -2 583 0.0 5.09 141.8 0.6 06/28/2021 03:31:56 -5 593 0.0 5.09 141.8 0.6 06/28/2021 03:32:16 -10 668 0.0 5.09 141.8 0.6 06/28/2021 03:32:36 -8 661 0.0 5.09 141.8 0.6 06/28/2021 03:32:56 -5 733 0.0 5.09 141.8 0.6 06/28/2021 03:33:16 -8 760 0.0 5.09 141.8 0.6 06/28/2021 03:33:36 -5 824 0.0 5.09 141.8 0.6 06/28/2021 03:33:56 -7 878 0.0 5.09 141.8 0.6 06/28/2021 03:34:16 -2 981 0.0 5.09 141.8 0.6 06/28/2021 03:34:36 -6 934 0.0 5.08 141.8 0.6 06/28/2021 03:34:56 -10 933 0.0 5.09 141.8 0.6 06/28/2021 03:35:16 -8 937 0.0 5.09 141.8 0.6 06/28/2021 03:35:36 -8 916 0.0 5.09 141.8 0.6 06/28/2021 03:35:56 -7 978 0.0 5.09 141.8 0.6 06/28/2021 03:36:16 -4 947 0.0 5.09 141.8 0.6 06/28/2021 03:36:36 -8 980 0.0 5.09 141.8 0.6 06/28/2021 03:36:56 -5 936 0.0 5.09 141.8 0.6 06/28/2021 03:37:16 -8 947 0.0 5.09 141.8 0.6 06/28/2021 03:37:36 -8 930 0.0 5.09 141.8 0.6 06/28/2021 03:37:56 -10 920 0.0 5.09 141.8 0.6 06/28/2021 03:38:16 -9 945 0.0 5.09 141.8 0.6 06/28/2021 03:38:36 -9 939 0.0 5.09 141.8 0.6 06/28/2021 03:38:56 -11 927 0.0 5.09 141.8 0.6 06/28/2021 03:39:16 -5 997 0.0 5.09 141.8 0.6 06/28/2021 03:39:36 -5 985 0.0 5.09 141.8 0.6 06/28/2021 03:39:56 -11 936 0.0 5.09 141.8 0.6 06/28/2021 03:40:16 -9 938 0.0 5.09 141.8 0.6 06/28/2021 03:40:36 -4 965 0.0 5.09 141.8 0.6 06/28/2021 03:40:56 -5 955 0.0 5.09 141.8 0.6 06/28/2021 03:41:16 -8 996 0.0 5.09 141.8 0.6 06/28/2021 03:41:36 -4 959 0.0 5.09 141.8 0.6 Page 67 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 03:42:16 -7 962 0.0 5.09 141.8 0.6 06/28/2021 03:42:36 -7 902 0.0 5.09 141.8 0.6 06/28/2021 03:42:56 -8 853 0.0 5.09 141.8 0.6 06/28/2021 03:43:16 -8 928 0.0 5.09 141.8 0.6 06/28/2021 03:43:36 -5 995 0.0 5.09 141.8 0.6 06/28/2021 03:43:56 -8 911 0.0 5.09 141.8 0.6 06/28/2021 03:44:16 -2 908 0.0 5.09 141.8 0.6 06/28/2021 03:44:36 -12 965 0.0 5.09 141.8 0.6 06/28/2021 03:44:56 -3 919 0.0 5.08 141.8 0.6 06/28/2021 03:45:16 -9 847 0.0 5.09 141.8 0.6 06/28/2021 03:45:36 -6 952 0.0 5.09 141.8 0.6 06/28/2021 03:45:56 -9 934 0.0 5.09 141.8 0.6 06/28/2021 03:46:16 -8 883 0.0 5.08 141.8 0.6 06/28/2021 03:46:36 -10 941 0.0 5.09 141.8 0.6 06/28/2021 03:46:56 -7 959 0.0 5.09 141.8 0.6 06/28/2021 03:47:16 -6 1014 0.0 5.09 141.8 0.6 06/28/2021 03:47:36 -1 1011 0.0 5.08 141.8 0.6 06/28/2021 03:47:56 -5 960 0.0 5.09 141.8 0.6 06/28/2021 03:48:16 -5 1017 0.0 5.09 141.8 0.6 06/28/2021 03:48:36 -6 1054 0.0 5.09 141.8 0.6 06/28/2021 03:48:56 -7 1071 0.0 5.09 141.8 0.6 06/28/2021 03:49:16 -3 1044 0.0 5.09 141.8 0.6 06/28/2021 03:49:36 -7 1006 0.0 5.09 141.8 0.6 06/28/2021 03:49:56 -10 1040 0.0 5.09 141.8 0.6 06/28/2021 03:50:16 -4 1091 0.0 5.09 141.8 0.6 06/28/2021 03:50:36 -4 1057 0.0 5.09 141.8 0.6 06/28/2021 03:50:56 -8 1026 0.0 5.09 141.8 0.6 06/28/2021 03:51:16 -3 1088 0.0 5.09 141.8 0.6 06/28/2021 03:51:36 -3 1142 0.0 5.09 141.8 0.6 06/28/2021 03:51:56 -5 1044 0.0 5.09 141.8 0.6 06/28/2021 03:52:16 -9 1022 0.0 5.08 141.8 0.6 06/28/2021 03:52:36 -5 1039 0.0 5.09 141.8 0.6 06/28/2021 03:52:56 -5 1050 0.0 5.08 141.8 0.6 06/28/2021 03:53:16 -6 1122 0.0 5.09 141.8 0.6 06/28/2021 03:53:36 -6 1183 0.0 5.09 141.8 0.6 06/28/2021 03:53:56 -3 1233 0.0 5.09 141.8 0.6 06/28/2021 03:54:16 -6 1212 0.0 5.09 141.8 0.6 06/28/2021 03:54:36 -5 1199 0.0 5.08 141.8 0.6 06/28/2021 03:54:56 -11 1214 0.0 5.09 141.8 0.6 06/28/2021 03:55:16 -11 1237 0.0 5.09 141.8 0.6 06/28/2021 03:55:36 -6 1307 0.0 5.09 141.8 0.6 06/28/2021 03:55:56 -7 1376 0.0 5.09 141.8 0.6 06/28/2021 03:56:16 -11 1381 0.0 5.09 141.8 0.6 06/28/2021 03:56:36 -6 1391 0.0 5.09 141.8 0.6 06/28/2021 03:56:56 -8 1352 0.0 5.09 141.8 0.6 06/28/2021 03:57:16 -8 1323 0.0 5.09 141.8 0.6 06/28/2021 03:57:36 -10 1302 0.0 5.09 141.8 0.6 06/28/2021 03:57:56 -10 1286 0.0 5.09 141.8 0.6 06/28/2021 03:58:16 -10 1285 0.0 5.09 141.8 0.6 06/28/2021 03:58:36 -9 1319 0.0 5.09 141.8 0.6 06/28/2021 03:58:56 -10 1349 0.0 5.09 141.8 0.6 06/28/2021 03:59:16 -5 1401 0.0 5.09 141.8 0.6 06/28/2021 03:59:36 -7 1345 0.0 5.09 141.8 0.6 06/28/2021 03:59:56 -4 1337 0.0 5.08 141.8 0.6 Page 68 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 04:00:36 -8 1289 0.0 5.09 141.8 0.6 06/28/2021 04:00:56 -14 1312 0.0 5.09 141.8 0.6 06/28/2021 04:01:16 -11 1340 0.0 5.09 141.8 0.6 06/28/2021 04:01:36 -12 1345 0.0 5.09 141.8 0.6 06/28/2021 04:01:56 -8 1341 0.0 5.09 141.8 0.6 06/28/2021 04:02:16 -10 1344 0.0 5.09 141.8 0.6 06/28/2021 04:02:36 -9 1300 0.0 5.09 141.8 0.6 06/28/2021 04:02:56 -8 1280 0.0 5.09 141.8 0.6 06/28/2021 04:03:16 -8 1298 0.0 5.09 141.8 0.6 06/28/2021 04:03:36 -9 1344 0.0 5.09 141.8 0.6 06/28/2021 04:03:56 -14 1352 0.0 5.09 141.8 0.6 06/28/2021 04:04:16 -6 1415 0.0 5.09 141.8 0.6 06/28/2021 04:04:36 -4 1402 0.0 5.09 141.8 0.6 06/28/2021 04:04:56 -5 1384 0.0 5.09 141.8 0.6 06/28/2021 04:05:16 -1 1419 0.0 5.09 141.8 0.6 06/28/2021 04:05:36 -5 1362 0.0 5.09 141.8 0.6 06/28/2021 04:05:56 -9 1395 0.0 5.09 141.8 0.6 06/28/2021 04:06:16 -5 1498 0.0 5.09 141.8 0.6 06/28/2021 04:06:36 -12 1534 0.0 5.09 141.8 0.6 06/28/2021 04:06:56 -3 1623 0.0 5.09 141.8 0.6 06/28/2021 04:07:16 -6 1609 0.0 5.09 141.8 0.6 06/28/2021 04:07:36 -4 1621 0.0 5.09 141.8 0.6 06/28/2021 04:07:56 -8 1645 0.0 5.08 141.8 0.6 06/28/2021 04:08:16 -4 1750 0.0 5.08 141.8 0.6 06/28/2021 04:08:36 -7 1810 0.0 5.09 141.8 0.6 06/28/2021 04:08:56 -4 1867 0.0 5.09 141.8 0.6 06/28/2021 04:09:16 -2 1863 0.0 5.09 141.8 0.6 06/28/2021 04:09:36 -6 1848 0.0 5.09 141.8 0.6 06/28/2021 04:09:56 -4 1922 0.0 5.09 141.8 0.6 06/28/2021 04:10:16 -6 2014 0.0 5.09 141.8 0.6 06/28/2021 04:10:36 -5 2106 0.0 5.09 141.8 0.6 06/28/2021 04:10:56 0 2110 0.0 5.09 141.8 0.6 06/28/2021 04:11:16 -5 2060 0.0 5.09 141.8 0.6 06/28/2021 04:11:36 -7 2066 0.0 5.09 141.8 0.6 06/28/2021 04:11:56 -6 2128 0.0 5.09 141.8 0.6 06/28/2021 04:12:16 -8 2091 0.0 5.09 141.8 0.6 06/28/2021 04:12:36 -6 2057 0.0 5.09 141.8 0.6 06/28/2021 04:12:56 -7 1985 0.0 5.08 141.8 0.6 06/28/2021 04:13:16 -2 2034 0.0 5.08 141.8 0.6 06/28/2021 04:13:36 -9 2002 0.0 5.09 141.8 0.6 06/28/2021 04:13:56 -2 2053 0.0 5.09 141.8 0.6 06/28/2021 04:14:16 -4 2003 0.0 5.08 141.8 0.6 06/28/2021 04:14:36 -6 1950 0.0 5.09 141.8 0.6 06/28/2021 04:14:56 -3 1892 0.0 5.09 141.8 0.6 06/28/2021 04:15:16 -7 1840 0.0 5.09 141.8 0.6 06/28/2021 04:15:36 -5 1855 0.0 5.09 141.8 0.6 06/28/2021 04:15:56 -5 1886 0.0 5.09 141.8 0.6 06/28/2021 04:16:16 -7 1856 0.0 5.09 141.8 0.6 06/28/2021 04:16:36 -5 1773 0.0 5.09 141.8 0.6 06/28/2021 04:16:56 -6 1650 0.0 5.09 141.8 0.6 06/28/2021 04:17:16 -3 1661 0.0 5.09 141.8 0.6 06/28/2021 04:17:36 -5 1700 0.0 5.09 141.8 0.6 06/28/2021 04:17:56 -3 1712 0.0 5.09 141.8 0.6 06/28/2021 04:18:16 -0 1665 0.0 5.09 141.8 0.6 Page 69 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 04:18:56 -1 1657 0.0 5.08 141.8 0.6 06/28/2021 04:19:16 -9 1649 0.0 5.09 141.8 0.6 06/28/2021 04:19:36 -8 1620 0.0 5.09 141.8 0.6 06/28/2021 04:19:56 -10 1610 0.0 5.09 141.8 0.6 06/28/2021 04:20:16 -5 1625 0.0 5.09 141.8 0.6 06/28/2021 04:20:36 -4 1613 0.0 5.08 141.8 0.6 06/28/2021 04:20:56 -10 1570 0.0 5.09 141.8 0.6 06/28/2021 04:21:16 -4 1580 0.0 5.08 141.8 0.6 06/28/2021 04:21:36 -3 1588 0.0 5.09 141.8 0.6 06/28/2021 04:21:56 -4 1641 0.0 5.09 141.8 0.6 06/28/2021 04:22:16 -3 1644 0.0 5.09 141.8 0.6 06/28/2021 04:22:36 -5 1622 0.0 5.09 141.8 0.6 06/28/2021 04:22:56 -1 1693 0.0 5.09 141.8 0.6 06/28/2021 04:23:16 3 1674 0.0 5.09 141.8 0.6 06/28/2021 04:23:36 -4 1651 0.0 5.09 141.8 0.6 06/28/2021 04:23:56 -7 1687 0.0 5.09 141.8 0.6 06/28/2021 04:24:16 -7 1694 0.0 5.08 141.8 0.6 06/28/2021 04:24:36 -9 1671 0.0 5.09 141.8 0.6 06/28/2021 04:24:56 -7 1686 0.0 5.08 141.8 0.6 06/28/2021 04:25:16 -4 1717 0.0 5.09 141.8 0.6 06/28/2021 04:25:36 -6 1811 0.0 5.09 141.8 0.6 06/28/2021 04:25:56 -5 1792 0.0 5.08 141.8 0.6 06/28/2021 04:26:16 -4 1818 0.0 5.09 141.8 0.6 06/28/2021 04:26:36 -6 1872 0.0 5.09 141.8 0.6 06/28/2021 04:26:56 -4 1877 0.0 5.09 141.8 0.6 06/28/2021 04:27:16 -5 1881 0.0 5.09 141.8 0.6 06/28/2021 04:27:36 -10 1924 0.0 5.08 141.8 0.6 06/28/2021 04:27:56 2 1987 0.0 5.09 141.8 0.6 06/28/2021 04:28:16 -1 1963 0.0 5.09 141.8 0.6 06/28/2021 04:28:36 -6 1981 0.0 5.09 141.8 0.6 06/28/2021 04:28:56 -6 1964 0.0 5.08 141.8 0.6 06/28/2021 04:29:16 -9 1974 0.0 5.09 141.8 0.6 06/28/2021 04:29:36 -9 1989 0.0 5.09 141.8 0.6 06/28/2021 04:29:56 -2 2056 0.0 5.09 141.8 0.6 06/28/2021 04:30:16 -3 2071 0.0 5.08 141.8 0.6 06/28/2021 04:30:36 -5 1985 0.0 5.09 141.8 0.6 06/28/2021 04:30:56 -5 2052 0.0 5.08 141.8 0.6 06/28/2021 04:31:16 -3 2030 0.0 5.09 141.8 0.6 06/28/2021 04:31:36 -1 2047 0.0 5.09 141.8 0.6 06/28/2021 04:31:56 -4 2042 0.0 5.09 141.8 0.6 06/28/2021 04:32:16 -5 2070 0.0 5.09 141.8 0.6 06/28/2021 04:32:36 -3 2134 0.0 5.09 141.8 0.6 06/28/2021 04:32:56 -3 2125 0.0 5.08 141.8 0.6 06/28/2021 04:33:16 -5 2152 0.0 5.09 141.8 0.6 06/28/2021 04:33:36 -3 2147 0.0 5.08 141.8 0.6 06/28/2021 04:33:56 -4 2171 0.0 5.09 141.8 0.6 06/28/2021 04:34:16 -6 2184 0.0 5.08 141.8 0.6 06/28/2021 04:34:36 -4 2210 0.0 5.09 141.8 0.6 06/28/2021 04:34:56 -7 2198 0.0 5.09 141.8 0.6 06/28/2021 04:35:16 -9 2169 0.0 5.09 141.8 0.6 06/28/2021 04:35:36 -5 2153 0.0 5.09 141.8 0.6 06/28/2021 04:35:56 -6 2083 0.0 5.09 141.8 0.6 06/28/2021 04:36:16 -12 2064 0.0 5.09 141.8 0.6 06/28/2021 04:36:36 -4 2069 0.0 5.09 141.8 0.6 Page 70 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 04:37:16 -4 1992 0.0 5.09 141.8 0.6 06/28/2021 04:37:36 -5 2023 0.0 5.09 141.8 0.6 06/28/2021 04:37:56 -4 2023 0.0 5.09 141.8 0.6 06/28/2021 04:38:16 -3 1983 0.0 5.09 141.8 0.6 06/28/2021 04:38:36 -4 2077 0.0 5.09 141.8 0.6 06/28/2021 04:38:56 -4 2140 0.0 5.09 141.8 0.6 06/28/2021 04:39:16 -5 2108 0.0 5.09 141.8 0.6 06/28/2021 04:39:36 -10 2022 0.0 5.09 141.8 0.6 06/28/2021 04:39:56 -4 2118 0.0 5.09 141.8 0.6 06/28/2021 04:40:16 -4 2163 0.0 5.09 141.8 0.6 06/28/2021 04:40:36 -7 2120 0.0 5.09 141.8 0.6 06/28/2021 04:40:56 -5 2117 0.0 5.09 141.8 0.6 06/28/2021 04:41:16 -7 2100 0.0 5.09 141.8 0.6 06/28/2021 04:41:36 -5 2092 0.0 5.09 141.8 0.6 06/28/2021 04:41:56 -8 2109 0.0 5.09 141.8 0.6 06/28/2021 04:42:16 -8 2171 0.0 5.09 141.8 0.6 06/28/2021 04:42:36 -11 2124 0.0 5.09 141.8 0.6 06/28/2021 04:42:56 -6 2144 0.0 5.09 141.8 0.6 06/28/2021 04:43:16 -3 2179 0.0 5.09 141.8 0.6 06/28/2021 04:43:36 -4 2143 0.0 5.09 141.8 0.6 06/28/2021 04:43:56 -6 2148 0.0 5.09 141.8 0.6 06/28/2021 04:44:16 -5 2143 0.0 5.09 141.8 0.6 06/28/2021 04:44:36 -1 2173 0.0 5.09 141.8 0.6 06/28/2021 04:44:56 -7 2151 0.0 5.09 141.8 0.6 06/28/2021 04:45:16 -10 2139 0.0 5.09 141.8 0.6 06/28/2021 04:45:36 -11 2137 0.0 5.09 141.8 0.6 06/28/2021 04:45:56 -12 2141 0.0 5.09 141.8 0.6 06/28/2021 04:46:16 -9 2133 0.0 5.09 141.8 0.6 06/28/2021 04:46:36 -7 2119 0.0 5.09 141.8 0.6 06/28/2021 04:46:56 -9 2104 0.0 5.09 141.8 0.6 06/28/2021 04:47:16 -1 2139 0.0 5.09 141.8 0.6 06/28/2021 04:47:36 -9 2046 0.0 5.09 141.8 0.6 06/28/2021 04:47:56 -3 2062 0.0 5.09 141.8 0.6 06/28/2021 04:48:16 -4 2115 0.0 5.09 141.8 0.6 06/28/2021 04:48:36 -5 2091 0.0 5.09 141.8 0.6 06/28/2021 04:48:56 -6 2056 0.0 5.09 141.8 0.6 06/28/2021 04:49:16 -1 2069 0.0 5.09 141.8 0.6 06/28/2021 04:49:36 -4 1995 0.0 5.09 141.8 0.6 06/28/2021 04:49:56 -7 2031 0.0 5.09 141.8 0.6 06/28/2021 04:50:16 -7 2100 0.0 5.09 141.8 0.6 06/28/2021 04:50:36 -7 2088 0.0 5.09 141.8 0.6 06/28/2021 04:50:56 -8 2078 0.0 5.09 141.8 0.6 06/28/2021 04:51:16 -10 2050 0.0 5.09 141.8 0.6 06/28/2021 04:51:36 -6 2035 0.0 5.09 141.8 0.6 06/28/2021 04:51:56 -9 2016 0.0 5.09 141.8 0.6 06/28/2021 04:52:16 -9 2010 0.0 5.08 141.8 0.6 06/28/2021 04:52:36 -3 2079 0.0 5.09 141.8 0.6 06/28/2021 04:52:56 -8 2059 0.0 5.09 141.8 0.6 06/28/2021 04:53:16 -5 2146 0.0 5.09 141.8 0.6 06/28/2021 04:53:36 -4 2146 0.0 5.09 141.8 0.6 06/28/2021 04:53:56 -6 2140 0.0 5.09 141.8 0.6 06/28/2021 04:54:16 -3 2163 0.0 5.09 141.8 0.6 06/28/2021 04:54:36 -5 2165 0.0 5.09 141.8 0.6 06/28/2021 04:54:56 -5 2116 0.0 5.09 141.8 0.6 Page 71 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 04:55:36 -12 2118 0.0 5.09 141.8 0.6 06/28/2021 04:55:56 -5 2140 0.0 5.09 141.8 0.6 06/28/2021 04:56:16 -4 2037 0.0 5.09 141.8 0.6 06/28/2021 04:56:36 -9 1947 0.0 5.09 141.8 0.6 06/28/2021 04:56:56 -7 1962 0.0 5.09 141.8 0.6 06/28/2021 04:57:16 -8 1971 0.0 5.09 141.8 0.6 06/28/2021 04:57:36 -6 1940 0.0 5.09 141.8 0.6 06/28/2021 04:57:56 -2 1919 0.0 5.09 141.8 0.6 06/28/2021 04:58:16 -6 1851 0.0 5.09 141.8 0.6 06/28/2021 04:58:36 -10 1869 0.0 5.09 141.8 0.6 06/28/2021 04:58:56 -9 1886 0.0 5.09 141.8 0.6 06/28/2021 04:59:16 -9 1919 0.0 5.09 141.8 0.6 06/28/2021 04:59:36 -10 1974 0.0 5.09 141.8 0.6 06/28/2021 04:59:56 -0 2018 0.0 5.09 141.8 0.6 06/28/2021 05:00:16 -7 1988 0.0 5.09 141.8 0.6 06/28/2021 05:00:36 -4 1993 0.0 5.09 141.8 0.6 06/28/2021 05:00:56 -9 2006 0.0 5.09 141.8 0.6 06/28/2021 05:01:16 -12 2002 0.0 5.09 141.8 0.6 06/28/2021 05:01:36 -1 2072 0.0 5.09 141.8 0.6 06/28/2021 05:01:56 -6 2031 0.0 5.09 141.8 0.6 06/28/2021 05:02:16 -5 2001 0.0 5.09 141.8 0.6 06/28/2021 05:02:36 -7 1958 0.0 5.09 141.8 0.6 06/28/2021 05:02:56 -5 2036 0.0 5.09 141.8 0.6 06/28/2021 05:03:16 -9 2010 0.0 5.09 141.8 0.6 06/28/2021 05:03:36 -2 2035 0.0 5.09 141.8 0.6 06/28/2021 05:03:56 -4 2004 0.0 5.09 141.8 0.6 06/28/2021 05:04:16 -2 2003 0.0 5.09 141.8 0.6 06/28/2021 05:04:36 -7 1976 0.0 5.09 141.8 0.6 06/28/2021 05:04:56 -5 2017 0.0 5.09 141.8 0.6 06/28/2021 05:05:16 -5 2042 0.0 5.09 141.8 0.6 06/28/2021 05:05:36 -7 1998 0.0 5.09 141.8 0.6 06/28/2021 05:05:56 -5 2010 0.0 5.09 141.8 0.6 06/28/2021 05:06:16 -7 2003 0.0 5.09 141.8 0.6 06/28/2021 05:06:36 -3 2100 0.0 5.09 141.8 0.6 06/28/2021 05:06:56 -0 2093 0.0 5.09 141.8 0.6 06/28/2021 05:07:16 -10 2039 0.0 5.09 141.8 0.6 06/28/2021 05:07:36 -8 2080 0.0 5.09 141.8 0.6 06/28/2021 05:07:56 -7 2088 0.0 5.09 141.8 0.6 06/28/2021 05:08:16 -8 2078 0.0 5.09 141.8 0.6 06/28/2021 05:08:36 -6 2040 0.0 5.09 141.8 0.6 06/28/2021 05:08:56 -5 1922 0.0 5.09 141.8 0.6 06/28/2021 05:09:16 -6 1878 0.0 5.09 141.8 0.6 06/28/2021 05:09:36 -10 1880 0.0 5.09 141.8 0.6 06/28/2021 05:09:56 -4 1908 0.0 5.09 141.8 0.6 06/28/2021 05:10:16 -8 1788 0.0 5.09 141.8 0.6 06/28/2021 05:10:36 -6 1692 0.0 5.10 141.8 0.6 06/28/2021 05:10:56 -8 1733 0.0 5.09 141.8 0.6 06/28/2021 05:11:16 -5 1745 0.0 5.09 141.8 0.6 06/28/2021 05:11:36 -6 1694 0.0 5.09 141.8 0.6 06/28/2021 05:11:56 -4 1678 0.0 5.09 141.8 0.6 06/28/2021 05:12:16 -5 1754 0.0 5.09 141.8 0.6 06/28/2021 05:12:36 -3 1782 0.0 5.09 141.8 0.6 06/28/2021 05:12:56 -3 1754 0.0 5.09 141.8 0.6 06/28/2021 05:13:16 -6 1711 0.0 5.09 141.8 0.6 Page 72 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 05:13:56 -9 1700 0.0 5.09 141.8 0.6 06/28/2021 05:14:16 -7 1797 0.0 5.09 141.8 0.6 06/28/2021 05:14:36 -4 1823 0.0 5.09 141.8 0.6 06/28/2021 05:14:56 -9 1772 0.0 5.09 141.8 0.6 06/28/2021 05:15:16 -3 1778 0.0 5.09 141.8 0.6 06/28/2021 05:15:36 -7 1736 0.0 5.09 141.8 0.6 06/28/2021 05:15:36 -1 1732 0.0 5.09 141.8 0.6 06/28/2021 05:15:56 -5 1736 0.0 5.09 141.8 0.6 06/28/2021 05:16:16 -5 1815 0.0 5.09 141.8 0.6 06/28/2021 05:16:36 -4 1837 0.0 5.09 141.8 0.6 06/28/2021 05:16:56 -0 1790 0.0 5.09 141.8 0.6 06/28/2021 05:17:16 -5 1727 0.0 5.09 141.8 0.6 06/28/2021 05:17:36 -6 1815 0.0 5.09 141.8 0.6 06/28/2021 05:17:56 -4 1874 0.0 5.09 141.8 0.6 06/28/2021 05:18:16 -2 1839 0.0 5.09 141.8 0.6 06/28/2021 05:18:36 -5 1794 0.0 5.09 141.8 0.6 06/28/2021 05:18:56 -7 1824 0.0 5.09 141.8 0.6 06/28/2021 05:19:36 -5 1938 0.0 5.09 141.8 0.6 06/28/2021 05:19:36 -2 1930 0.0 5.09 141.8 0.6 06/28/2021 05:19:56 -5 1943 0.0 5.09 141.8 0.6 06/28/2021 05:20:16 -5 1912 0.0 5.09 141.8 0.6 06/28/2021 05:20:36 -4 1930 0.0 5.09 141.8 0.6 06/28/2021 05:20:56 -6 1981 0.0 5.09 141.8 0.6 06/28/2021 05:21:16 -4 2036 0.0 5.09 141.8 0.6 06/28/2021 05:21:36 -1 2024 0.0 5.09 141.8 0.6 06/28/2021 05:21:56 -2 2053 0.0 5.09 141.8 0.6 06/28/2021 05:22:16 -5 2071 0.0 5.09 141.8 0.6 06/28/2021 05:22:36 -7 2105 0.0 5.09 141.8 0.6 06/28/2021 05:22:56 -3 2124 0.0 5.10 141.8 0.6 06/28/2021 05:23:16 -3 2086 0.0 5.09 141.8 0.6 06/28/2021 05:23:36 -8 2052 0.0 5.09 141.8 0.6 06/28/2021 05:23:56 -5 2113 0.0 5.09 141.8 0.6 06/28/2021 05:24:16 -14 2091 0.0 5.09 141.8 0.6 06/28/2021 05:24:36 -4 2071 0.0 5.09 141.8 0.6 06/28/2021 05:24:56 -10 1962 0.0 5.09 141.8 0.6 06/28/2021 05:25:16 -4 2005 0.0 5.09 141.8 0.6 06/28/2021 05:25:36 -7 2036 0.0 5.09 141.8 0.6 06/28/2021 05:25:56 -4 2064 0.0 5.09 141.8 0.6 06/28/2021 05:26:16 -3 2081 0.0 5.09 141.8 0.6 06/28/2021 05:26:36 -1 2058 0.0 5.09 141.8 0.6 06/28/2021 05:26:56 -10 2025 0.0 5.09 141.8 0.6 06/28/2021 05:27:16 -5 2073 0.0 5.09 141.8 0.6 06/28/2021 05:27:36 -3 2081 0.0 5.09 141.8 0.6 06/28/2021 05:27:56 -2 2029 0.0 5.09 141.8 0.6 06/28/2021 05:28:16 -9 1798 0.0 5.09 141.8 0.6 06/28/2021 05:28:36 -5 1762 0.0 5.10 141.8 0.6 06/28/2021 05:28:56 -6 1727 0.0 5.10 141.8 0.6 06/28/2021 05:29:16 -4 1703 0.0 5.09 141.8 0.6 06/28/2021 05:29:36 -3 1632 0.0 5.09 141.8 0.6 06/28/2021 05:29:56 -8 1587 0.0 5.09 141.8 0.6 06/28/2021 05:30:16 -9 1623 0.0 5.09 141.8 0.6 06/28/2021 05:30:36 -3 1602 0.0 5.09 141.8 0.6 06/28/2021 05:30:56 -1 1580 0.0 5.09 141.8 0.6 06/28/2021 05:31:16 -3 1522 0.0 5.09 141.8 0.6 Page 73 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 05:31:56 -8 1536 0.0 5.09 141.8 0.6 06/28/2021 05:32:16 -5 1611 0.0 5.09 141.8 0.6 06/28/2021 05:32:36 -1 1634 0.0 5.09 141.8 0.6 06/28/2021 05:32:56 -4 1591 0.0 5.09 141.8 0.6 06/28/2021 05:33:16 -7 1614 0.0 5.09 141.8 0.6 06/28/2021 05:33:36 -2 1663 0.0 5.09 141.8 0.6 06/28/2021 05:33:56 -9 1699 0.0 5.09 141.8 0.6 06/28/2021 05:34:16 -7 1728 0.0 5.10 141.8 0.6 06/28/2021 05:34:36 -4 1769 0.0 5.09 141.8 0.6 06/28/2021 05:34:56 1 1798 0.0 5.09 141.8 0.6 06/28/2021 05:35:16 -4 1772 0.0 5.10 141.8 0.6 06/28/2021 05:35:36 -7 1791 0.0 5.10 141.8 0.6 06/28/2021 05:35:56 -5 1877 0.0 5.09 141.8 0.6 06/28/2021 05:36:16 -7 1899 0.0 5.09 141.8 0.6 06/28/2021 05:36:36 -3 1937 0.0 5.09 141.8 0.6 06/28/2021 05:36:56 -5 1882 0.0 5.09 141.8 0.6 06/28/2021 05:37:16 -8 1854 0.0 5.09 141.8 0.6 06/28/2021 05:37:36 -5 1881 0.0 5.09 141.8 0.6 06/28/2021 05:37:56 -7 1873 0.0 5.10 141.8 0.6 06/28/2021 05:38:16 -5 1921 0.0 5.09 141.8 0.6 06/28/2021 05:38:36 -5 1988 0.0 5.09 141.8 0.6 06/28/2021 05:38:56 -9 2026 0.0 5.10 141.8 0.6 06/28/2021 05:39:16 -6 2044 0.0 5.09 141.8 0.6 06/28/2021 05:39:36 -5 2043 0.0 5.09 141.8 0.6 06/28/2021 05:39:56 -5 2045 0.0 5.09 141.8 0.6 06/28/2021 05:40:16 -7 2067 0.0 5.10 141.8 0.6 06/28/2021 05:40:36 4 2167 0.0 5.10 141.8 0.6 06/28/2021 05:40:56 -1 2202 0.0 5.10 141.8 0.6 06/28/2021 05:41:16 -10 2077 0.0 5.10 141.8 0.6 06/28/2021 05:41:36 -7 2083 0.0 5.10 141.8 0.6 06/28/2021 05:41:56 -7 1998 0.0 5.09 141.8 0.6 06/28/2021 05:42:16 -5 1950 0.0 5.10 141.8 0.6 06/28/2021 05:42:36 -9 1946 0.0 5.09 141.8 0.6 06/28/2021 05:42:56 -4 1898 0.0 5.10 141.8 0.6 06/28/2021 05:43:16 -5 1877 0.0 5.10 141.8 0.6 06/28/2021 05:43:36 -8 1924 0.0 5.10 141.8 0.6 06/28/2021 05:43:56 -8 1911 0.0 5.10 141.8 0.6 06/28/2021 05:44:16 -6 1967 0.0 5.10 141.8 0.6 06/28/2021 05:44:36 -4 2001 0.0 5.09 141.8 0.6 06/28/2021 05:44:56 -3 2034 0.0 5.10 141.8 0.6 06/28/2021 05:45:16 -7 2072 0.0 5.09 141.8 0.6 06/28/2021 05:45:36 -7 2104 0.0 5.10 141.8 0.6 06/28/2021 05:45:56 -5 2121 0.0 5.09 141.8 0.6 06/28/2021 05:46:16 -7 2131 0.0 5.09 141.8 0.6 06/28/2021 05:46:36 -5 2139 0.0 5.10 141.8 0.6 06/28/2021 05:46:56 -10 2083 0.0 5.09 141.8 0.6 06/28/2021 05:47:16 -7 2123 0.0 5.10 141.8 0.6 06/28/2021 05:47:36 -2 2160 0.0 5.09 141.8 0.6 06/28/2021 05:47:56 -8 2067 0.0 5.09 141.8 0.6 06/28/2021 05:48:16 -8 2008 0.0 5.09 141.8 0.6 06/28/2021 05:48:36 -7 2047 0.0 5.09 141.8 0.6 06/28/2021 05:48:56 -4 1929 0.0 5.09 141.8 0.6 06/28/2021 05:49:16 -7 1925 0.0 5.10 141.8 0.6 06/28/2021 05:49:36 -4 1938 0.0 5.10 141.8 0.6 Page 74 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 05:50:16 -4 1981 0.0 5.10 141.8 0.6 06/28/2021 05:50:36 -6 1964 0.0 5.09 141.8 0.6 06/28/2021 05:50:56 -6 2000 0.0 5.09 141.8 0.6 06/28/2021 05:51:16 -8 2061 0.0 5.09 141.8 0.6 06/28/2021 05:51:36 -5 2111 0.0 5.10 141.8 0.6 06/28/2021 05:51:56 -7 2120 0.0 5.10 141.8 0.6 06/28/2021 05:52:16 -4 2128 0.0 5.10 141.8 0.6 06/28/2021 05:52:36 4 2137 0.0 5.10 141.8 0.6 06/28/2021 05:52:56 9 2147 0.0 5.10 141.8 0.6 06/28/2021 05:53:16 5 2120 0.0 5.09 141.8 0.6 06/28/2021 05:53:36 4 2095 0.0 5.10 141.8 0.6 06/28/2021 05:53:56 -1 1994 0.0 5.10 141.8 0.6 06/28/2021 05:54:16 -2 2058 0.0 5.09 141.8 0.6 06/28/2021 05:54:36 3 1977 0.0 5.09 141.8 0.6 06/28/2021 05:54:56 6 1969 0.0 5.09 141.8 0.6 06/28/2021 05:55:16 2 1986 0.0 5.10 141.8 0.6 06/28/2021 05:55:36 -4 1879 0.0 5.10 141.8 0.6 06/28/2021 05:55:56 -1 1956 0.0 5.09 141.8 0.6 06/28/2021 05:56:16 1 2000 0.0 5.10 141.8 0.6 06/28/2021 05:56:36 -1 2019 0.0 5.10 141.8 0.6 06/28/2021 05:56:56 1 2036 0.0 5.10 141.8 0.6 06/28/2021 05:57:16 4 2068 0.0 5.09 141.8 0.6 06/28/2021 05:57:36 13 2107 0.0 5.10 141.8 0.6 06/28/2021 05:57:56 -0 2086 0.0 5.10 141.8 0.6 06/28/2021 05:58:16 7 2148 0.0 5.09 141.8 0.6 06/28/2021 05:58:36 3 2147 0.0 5.10 141.8 0.6 06/28/2021 05:58:56 3 2003 0.0 5.09 141.8 0.6 06/28/2021 05:59:16 2 2022 0.0 5.10 141.8 0.6 06/28/2021 05:59:36 5 1994 0.0 5.10 141.8 0.6 06/28/2021 05:59:56 -7 1889 0.0 5.09 141.8 0.6 06/28/2021 06:00:16 -5 1946 0.0 5.10 141.8 0.6 06/28/2021 06:00:36 -0 1985 0.0 5.09 141.8 0.6 06/28/2021 06:00:56 -0 1986 0.0 5.09 141.8 0.6 06/28/2021 06:01:16 3 1989 0.0 5.10 141.8 0.6 06/28/2021 06:01:36 1 1999 0.0 5.10 141.8 0.6 06/28/2021 06:01:56 -1 1984 0.0 5.09 141.8 0.6 06/28/2021 06:02:16 1 2035 0.0 5.09 141.8 0.6 06/28/2021 06:02:36 1 2071 0.0 5.10 141.8 0.6 06/28/2021 06:02:56 -5 2086 0.0 5.10 141.8 0.6 06/28/2021 06:03:16 4 2102 0.0 5.09 141.8 0.6 06/28/2021 06:03:36 10 2071 0.0 5.09 141.8 0.6 06/28/2021 06:03:56 13 2104 0.0 5.09 141.8 0.6 06/28/2021 06:04:16 0 2054 0.0 5.10 141.8 0.6 06/28/2021 06:04:36 -6 2039 0.0 5.10 141.8 0.6 06/28/2021 06:04:56 3 2073 0.0 5.10 141.8 0.6 06/28/2021 06:05:16 -2 2044 0.0 5.10 141.8 0.6 06/28/2021 06:05:36 10 2123 0.0 5.09 141.8 0.6 06/28/2021 06:05:56 -1 2068 0.0 5.10 141.8 0.6 06/28/2021 06:06:16 -2 2046 0.0 5.10 141.8 0.6 06/28/2021 06:06:36 -1 2085 0.0 5.10 141.8 0.6 06/28/2021 06:06:56 1 2121 0.0 5.10 141.8 0.6 06/28/2021 06:07:16 7 2142 0.0 5.10 141.8 0.6 06/28/2021 06:07:36 8 2117 0.0 5.10 141.8 0.6 06/28/2021 06:07:56 -2 2079 0.0 5.10 141.8 0.6 Page 75 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 06:08:36 25 2186 0.0 5.10 141.8 0.6 06/28/2021 06:08:56 4 2016 0.0 5.10 141.8 0.6 06/28/2021 06:09:16 4 2073 0.0 5.10 141.8 0.6 06/28/2021 06:09:36 7 2039 0.0 5.10 141.8 0.6 06/28/2021 06:09:56 -1 2026 0.0 5.10 141.8 0.6 06/28/2021 06:10:16 3 2048 0.0 5.10 141.8 0.6 06/28/2021 06:10:36 3 2064 0.0 5.10 141.8 0.6 06/28/2021 06:10:56 3 2128 0.0 5.10 141.8 0.6 06/28/2021 06:11:16 -5 2109 0.0 5.09 141.8 0.6 06/28/2021 06:11:36 6 2127 0.0 5.10 141.8 0.6 06/28/2021 06:11:56 16 2196 0.0 5.09 141.8 0.6 06/28/2021 06:12:16 1 2130 0.0 5.10 141.8 0.6 06/28/2021 06:12:36 -3 2120 0.0 5.09 141.8 0.6 06/28/2021 06:12:56 -7 2098 0.0 5.10 141.8 0.6 06/28/2021 06:13:16 5 2014 0.0 5.10 141.8 0.6 06/28/2021 06:13:36 1 2043 0.0 5.10 141.8 0.6 06/28/2021 06:13:56 3 1950 0.0 5.10 141.8 0.6 06/28/2021 06:14:16 0 2001 0.0 5.09 141.8 0.6 06/28/2021 06:14:36 1 1891 0.0 5.10 141.8 0.6 06/28/2021 06:14:56 1 1952 0.0 5.10 141.8 0.6 06/28/2021 06:15:16 1 1975 0.0 5.10 141.8 0.6 06/28/2021 06:15:36 3 1991 0.0 5.10 141.8 0.6 06/28/2021 06:15:56 4 2005 0.0 5.10 141.8 0.6 06/28/2021 06:16:16 10 2025 0.0 5.09 141.8 0.6 06/28/2021 06:16:36 6 2079 0.0 5.09 141.8 0.6 06/28/2021 06:16:56 2 2109 0.0 5.10 141.8 0.6 06/28/2021 06:17:16 7 2149 0.0 5.10 141.8 0.6 06/28/2021 06:17:36 9 2134 0.0 5.10 141.8 0.6 06/28/2021 06:17:56 -1 2107 0.0 5.10 141.8 0.6 06/28/2021 06:18:16 13 2198 0.0 5.10 141.8 0.6 06/28/2021 06:18:36 -5 2123 0.0 5.10 141.8 0.6 06/28/2021 06:18:56 4 2179 0.0 5.10 141.8 0.6 06/28/2021 06:19:16 -4 1994 0.0 5.10 141.8 0.6 06/28/2021 06:19:36 -3 2056 0.0 5.10 141.8 0.6 06/28/2021 06:19:56 -5 1960 0.0 5.10 141.8 0.6 06/28/2021 06:20:16 -5 2012 0.0 5.10 141.8 0.6 06/28/2021 06:20:36 -2 1958 0.0 5.10 141.8 0.6 06/28/2021 06:20:56 -7 1974 0.0 5.10 141.8 0.6 06/28/2021 06:21:16 -7 1879 0.0 5.10 141.8 0.6 06/28/2021 06:21:36 -9 1936 0.0 5.10 141.8 0.6 06/28/2021 06:21:56 -4 1980 0.0 5.10 141.8 0.6 06/28/2021 06:22:16 -7 1980 0.0 5.09 141.8 0.6 06/28/2021 06:22:36 -2 2030 0.0 5.10 141.8 0.6 06/28/2021 06:22:56 -12 1993 0.0 5.10 141.8 0.6 06/28/2021 06:23:16 -6 2088 0.0 5.10 141.8 0.6 06/28/2021 06:23:36 -10 2111 0.0 5.10 141.8 0.6 06/28/2021 06:23:56 -5 2130 0.0 5.10 141.8 0.6 06/28/2021 06:24:16 -8 2085 0.0 5.10 141.8 0.6 06/28/2021 06:24:36 -7 2083 0.0 5.10 141.8 0.6 06/28/2021 06:24:56 -8 2131 0.0 5.10 141.8 0.6 06/28/2021 06:25:16 -7 2145 0.0 5.10 141.8 0.6 06/28/2021 06:25:36 -10 2103 0.0 5.10 141.8 0.6 06/28/2021 06:25:56 -7 2024 0.0 5.10 141.8 0.6 06/28/2021 06:26:16 -6 2082 0.0 5.10 141.8 0.6 Page 76 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 06:26:56 -12 1995 0.0 5.10 141.8 0.6 06/28/2021 06:27:16 -9 1909 0.0 5.10 141.8 0.6 06/28/2021 06:27:36 -5 1935 0.0 5.10 141.8 0.6 06/28/2021 06:27:56 -4 1973 0.0 5.10 141.8 0.6 06/28/2021 06:28:16 -2 1982 0.0 5.10 141.8 0.6 06/28/2021 06:28:36 -3 1984 0.0 5.10 141.8 0.6 06/28/2021 06:28:56 -4 2019 0.0 5.10 141.8 0.6 06/28/2021 06:29:16 -6 2065 0.0 5.10 141.8 0.6 06/28/2021 06:29:36 -9 2093 0.0 5.10 141.8 0.6 06/28/2021 06:29:56 -4 2098 0.0 5.09 141.8 0.6 06/28/2021 06:30:16 -5 2083 0.0 5.10 141.8 0.6 06/28/2021 06:30:36 -6 2113 0.0 5.10 141.8 0.6 06/28/2021 06:30:56 -5 2111 0.0 5.10 141.8 0.6 06/28/2021 06:31:16 -8 2103 0.0 5.10 141.8 0.6 06/28/2021 06:31:36 -6 2191 0.0 5.10 141.8 0.6 06/28/2021 06:31:56 -7 2123 0.0 5.10 141.8 0.6 06/28/2021 06:32:16 -6 2083 0.0 5.09 141.8 0.6 06/28/2021 06:32:36 -5 2091 0.0 5.10 141.8 0.6 06/28/2021 06:32:56 -9 2128 0.0 5.10 141.8 0.6 06/28/2021 06:33:16 -10 2133 0.0 5.10 141.8 0.6 06/28/2021 06:33:36 -6 2028 0.0 5.10 141.8 0.6 06/28/2021 06:33:56 -12 2065 0.0 5.10 141.8 0.6 06/28/2021 06:34:16 -4 1998 0.0 5.10 141.8 0.6 06/28/2021 06:34:36 -14 2014 0.0 5.10 141.8 0.6 06/28/2021 06:34:56 -10 2009 0.0 5.10 141.8 0.6 06/28/2021 06:35:16 -7 1956 0.0 5.10 141.8 0.6 06/28/2021 06:35:36 -4 2007 0.0 5.10 141.8 0.6 06/28/2021 06:35:56 -5 1928 0.0 5.10 141.8 0.6 06/28/2021 06:36:16 -7 1973 0.0 5.10 141.8 0.6 06/28/2021 06:36:36 -5 2000 0.0 5.10 141.8 0.6 06/28/2021 06:36:56 -4 2011 0.0 5.10 141.8 0.6 06/28/2021 06:37:16 -8 1971 0.0 5.10 141.8 0.6 06/28/2021 06:37:36 -8 2030 0.0 5.10 141.8 0.6 06/28/2021 06:37:56 -9 2094 0.0 5.10 141.8 0.6 06/28/2021 06:38:16 -6 2135 0.0 5.10 141.8 0.6 06/28/2021 06:38:36 -8 2139 0.0 5.10 141.8 0.6 06/28/2021 06:38:56 -8 2119 0.0 5.10 141.8 0.6 06/28/2021 06:39:16 -8 2114 0.0 5.10 141.8 0.6 06/28/2021 06:39:36 -9 2130 0.0 5.10 141.8 0.6 06/28/2021 06:39:56 -12 2115 0.0 5.09 141.8 0.6 06/28/2021 06:40:16 -7 2060 0.0 5.10 141.8 0.6 06/28/2021 06:40:36 -8 2087 0.0 5.09 141.8 0.6 06/28/2021 06:40:56 -5 2029 0.0 5.10 141.8 0.6 06/28/2021 06:41:16 -7 2041 0.0 5.10 141.8 0.6 06/28/2021 06:41:36 -12 1964 0.0 5.10 141.8 0.6 06/28/2021 06:41:56 -9 2034 0.0 5.10 141.8 0.6 06/28/2021 06:42:16 -6 1969 0.0 5.10 141.8 0.6 06/28/2021 06:42:36 -7 2000 0.0 5.10 141.8 0.6 06/28/2021 06:42:56 -8 1938 0.0 5.10 141.8 0.6 06/28/2021 06:43:16 -5 1966 0.0 5.10 141.8 0.6 06/28/2021 06:43:36 -7 1984 0.0 5.10 141.8 0.6 06/28/2021 06:43:56 -6 1910 0.0 5.10 141.8 0.6 06/28/2021 06:44:16 -5 1923 0.0 5.10 141.8 0.6 06/28/2021 06:44:36 -13 1938 0.0 5.10 141.8 0.6 Page 77 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 06:45:16 -9 1887 0.0 5.10 141.8 0.6 06/28/2021 06:45:36 -10 1899 0.0 5.10 141.8 0.6 06/28/2021 06:45:56 -5 1909 0.0 5.10 141.8 0.6 06/28/2021 06:46:16 -6 1839 0.0 5.10 141.8 0.6 06/28/2021 06:46:36 -8 1840 0.0 5.10 141.8 0.6 06/28/2021 06:46:56 -7 1882 0.0 5.10 141.8 0.6 06/28/2021 06:47:16 -7 1879 0.0 5.10 141.8 0.6 06/28/2021 06:47:36 -6 1795 0.0 5.10 141.8 0.6 06/28/2021 06:47:56 -7 1811 0.0 5.10 141.8 0.6 06/28/2021 06:48:16 -11 1837 0.0 5.10 141.8 0.6 06/28/2021 06:48:36 -6 1822 0.0 5.11 141.8 0.6 06/28/2021 06:48:56 -8 1750 0.0 5.10 141.8 0.6 06/28/2021 06:49:16 -7 1805 0.0 5.10 141.8 0.6 06/28/2021 06:49:36 -4 1839 0.0 5.10 141.8 0.6 06/28/2021 06:49:56 -8 1750 0.0 5.10 141.8 0.6 06/28/2021 06:50:16 -3 1763 0.0 5.10 141.8 0.6 06/28/2021 06:50:36 -9 1785 0.0 5.10 141.8 0.6 06/28/2021 06:50:56 -5 1755 0.0 5.10 141.8 0.6 06/28/2021 06:51:16 -8 1711 0.0 5.10 141.8 0.6 06/28/2021 06:51:36 -9 1760 0.0 5.10 141.8 0.6 06/28/2021 06:51:56 -3 1806 0.0 5.10 141.8 0.6 06/28/2021 06:52:16 -5 1724 0.0 5.10 141.8 0.6 06/28/2021 06:52:36 -8 1684 0.0 5.10 141.8 0.6 06/28/2021 06:52:56 -7 1732 0.0 5.10 141.8 0.6 06/28/2021 06:53:16 -6 1675 0.0 5.10 141.8 0.6 06/28/2021 06:53:36 -8 1685 0.0 5.10 141.8 0.6 06/28/2021 06:53:56 -13 1726 0.0 5.10 141.8 0.6 06/28/2021 06:54:16 -6 1665 0.0 5.10 141.8 0.6 06/28/2021 06:54:36 -4 1664 0.0 5.10 141.8 0.6 06/28/2021 06:54:56 -10 1691 0.0 5.10 141.8 0.6 06/28/2021 06:55:16 -4 1704 0.0 5.10 141.8 0.6 06/28/2021 06:55:36 -6 1628 0.0 5.10 141.8 0.6 06/28/2021 06:55:56 -5 1653 0.0 5.10 141.8 0.6 06/28/2021 06:56:16 -12 1669 0.0 5.11 141.8 0.6 06/28/2021 06:56:36 -9 1605 0.0 5.10 141.8 0.6 06/28/2021 06:56:56 -9 1637 0.0 5.10 141.8 0.6 06/28/2021 06:57:16 -8 1671 0.0 5.10 141.8 0.6 06/28/2021 06:57:36 -8 1598 0.0 5.10 141.8 0.6 06/28/2021 06:57:56 -5 1612 0.0 5.10 141.8 0.6 06/28/2021 06:58:16 -12 1614 0.0 5.11 141.8 0.6 06/28/2021 06:58:36 -6 1665 0.0 5.10 141.8 0.6 06/28/2021 06:58:56 -6 1690 0.0 5.10 141.8 0.6 06/28/2021 06:59:16 -4 1719 0.0 5.10 141.8 0.6 06/28/2021 06:59:36 -9 1737 0.0 5.10 141.8 0.6 06/28/2021 06:59:56 -7 1778 0.0 5.10 141.8 0.6 06/28/2021 07:00:16 -7 1870 0.0 5.10 141.8 0.6 06/28/2021 07:00:36 -7 1950 0.0 5.10 141.8 0.6 06/28/2021 07:00:56 -1 2038 0.0 5.10 141.8 0.6 06/28/2021 07:01:16 -3 2020 0.0 5.10 141.8 0.6 06/28/2021 07:01:36 -5 2017 0.0 5.10 141.8 0.6 06/28/2021 07:01:56 -10 2059 0.0 5.10 141.8 0.6 06/28/2021 07:02:16 -8 2128 0.0 5.10 141.8 0.6 06/28/2021 07:02:36 -12 2111 0.0 5.10 141.8 0.6 06/28/2021 07:02:56 -2 2161 0.0 5.10 141.8 0.6 Page 78 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 07:03:36 -5 2038 0.0 5.08 141.8 0.6 06/28/2021 07:03:56 -6 2053 0.0 5.09 141.8 0.6 06/28/2021 07:04:16 -9 1931 0.0 5.09 141.8 0.6 06/28/2021 07:04:36 -11 2017 0.0 5.09 141.8 0.6 06/28/2021 07:04:56 -4 1937 0.0 5.09 141.8 0.6 06/28/2021 07:05:36 -5 2036 0.0 5.09 141.8 0.6 06/28/2021 07:05:56 -2 2046 0.0 5.08 141.8 0.6 06/28/2021 07:06:16 -6 2048 0.0 5.09 141.8 0.6 06/28/2021 07:06:36 -6 2080 0.0 5.09 141.8 0.6 06/28/2021 07:06:56 -9 2123 0.0 5.09 141.8 0.6 06/28/2021 07:07:16 -6 2141 0.0 5.09 141.8 0.6 06/28/2021 07:07:36 -7 2074 0.0 5.09 141.8 0.6 06/28/2021 07:07:56 -8 2104 0.0 5.09 141.8 0.6 06/28/2021 07:08:16 -10 2102 0.0 5.09 141.8 0.6 06/28/2021 07:08:36 -11 2113 0.0 5.09 141.8 0.6 06/28/2021 07:08:56 -6 2042 0.0 5.09 141.8 0.6 06/28/2021 07:09:16 -5 2083 0.0 5.09 141.8 0.6 06/28/2021 07:09:36 -7 2070 0.0 5.09 141.8 0.6 06/28/2021 07:09:56 -12 1970 0.0 5.09 141.8 0.6 06/28/2021 07:10:16 -9 2064 0.0 5.09 141.8 0.6 06/28/2021 07:10:36 -6 2011 0.0 5.09 141.8 0.6 06/28/2021 07:10:56 -9 1996 0.0 5.09 141.8 0.6 06/28/2021 07:11:16 -2 2101 0.0 5.09 141.8 0.6 06/28/2021 07:11:36 -2 2105 0.0 5.09 141.8 0.6 06/28/2021 07:11:56 -5 2098 0.0 5.09 141.8 0.6 06/28/2021 07:12:16 -9 2099 0.0 5.09 141.8 0.6 06/28/2021 07:12:36 -8 2148 0.0 5.09 141.8 0.6 06/28/2021 07:12:56 -9 2131 0.0 5.09 141.8 0.6 06/28/2021 07:13:16 -12 2120 0.0 5.09 141.8 0.6 06/28/2021 07:13:36 -11 2132 0.0 5.09 141.8 0.6 06/28/2021 07:13:56 -7 2074 0.0 5.09 141.8 0.6 06/28/2021 07:14:16 -4 2083 0.0 5.09 141.8 0.6 06/28/2021 07:14:36 -8 2097 0.0 5.09 141.8 0.6 06/28/2021 07:14:56 -8 2001 0.0 5.09 141.8 0.6 06/28/2021 07:15:16 -9 2074 0.0 5.09 141.8 0.6 06/28/2021 07:15:36 -1 2034 0.0 5.09 141.8 0.6 06/28/2021 07:15:56 -7 2039 0.0 5.09 141.8 0.6 06/28/2021 07:16:16 -8 2080 0.0 5.09 141.8 0.6 06/28/2021 07:16:36 -7 2076 0.0 5.09 141.8 0.6 06/28/2021 07:16:56 -7 2105 0.0 5.09 141.8 0.6 06/28/2021 07:17:16 -4 2135 0.0 5.09 141.8 0.6 06/28/2021 07:17:36 -3 2149 0.0 5.09 141.8 0.6 06/28/2021 07:17:56 -7 2087 0.0 5.09 141.8 0.6 06/28/2021 07:18:16 -5 2130 0.0 5.09 141.8 0.6 06/28/2021 07:18:36 -11 2115 0.0 5.09 141.8 0.6 06/28/2021 07:18:56 -10 2121 0.0 5.09 141.8 0.6 06/28/2021 07:19:16 -4 2093 0.0 5.09 141.8 0.6 06/28/2021 07:19:36 -12 1987 0.0 5.09 141.8 0.6 06/28/2021 07:19:56 -5 2057 0.0 5.09 141.8 0.6 06/28/2021 07:20:16 -12 2073 0.0 5.09 141.8 0.6 06/28/2021 07:20:36 -9 1998 0.0 5.09 141.8 0.6 06/28/2021 07:20:56 -13 1937 0.0 5.09 141.8 0.6 06/28/2021 07:21:16 -8 2042 0.0 5.09 141.8 0.6 06/28/2021 07:21:36 -5 2042 0.0 5.09 141.8 0.6 Page 79 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 07:22:16 -11 1920 0.0 5.09 141.8 0.6 06/28/2021 07:22:36 -10 1935 0.0 5.09 141.8 0.6 06/28/2021 07:22:56 -9 2008 0.0 5.09 141.8 0.6 06/28/2021 07:23:16 -8 2048 0.0 5.09 141.8 0.6 06/28/2021 07:23:36 -2 2071 0.0 5.08 141.8 0.6 06/28/2021 07:23:56 -10 2024 0.0 5.09 141.8 0.6 06/28/2021 07:24:16 -9 2032 0.0 5.09 141.8 0.6 06/28/2021 07:24:36 -4 2127 0.0 5.09 141.8 0.6 06/28/2021 07:24:56 -5 2085 0.0 5.09 141.8 0.6 06/28/2021 07:25:16 -7 2092 0.0 5.09 141.8 0.6 06/28/2021 07:25:36 -8 2105 0.0 5.09 141.8 0.6 06/28/2021 07:25:56 -10 2109 0.0 5.09 141.8 0.6 06/28/2021 07:26:16 -13 2106 0.0 5.09 141.8 0.6 06/28/2021 07:26:36 -12 2118 0.0 5.09 141.8 0.6 06/28/2021 07:26:56 -3 2174 0.0 5.09 141.8 0.6 06/28/2021 07:27:16 -7 2053 0.0 5.09 141.8 0.6 06/28/2021 07:27:36 -10 2025 0.0 5.09 141.8 0.6 06/28/2021 07:27:56 -4 2069 0.0 5.09 141.8 0.6 06/28/2021 07:28:16 -10 2088 0.0 5.09 141.8 0.6 06/28/2021 07:28:36 -5 1995 0.0 5.09 141.8 0.6 06/28/2021 07:28:56 -7 2024 0.0 5.09 141.8 0.6 06/28/2021 07:29:16 -4 2106 0.0 5.09 141.8 0.6 06/28/2021 07:29:36 -8 1974 0.0 5.09 141.8 0.6 06/28/2021 07:29:56 -9 1984 0.0 5.09 141.8 0.6 06/28/2021 07:30:16 -13 2018 0.0 5.09 141.8 0.6 06/28/2021 07:30:36 -5 1916 0.0 5.09 141.8 0.6 06/28/2021 07:30:56 -6 1973 0.0 5.09 141.8 0.6 06/28/2021 07:31:16 -9 2005 0.0 5.09 141.8 0.6 06/28/2021 07:31:36 -8 2031 0.0 5.09 141.8 0.6 06/28/2021 07:31:56 -3 2083 0.0 5.09 141.8 0.6 06/28/2021 07:32:16 -7 2052 0.0 5.09 141.8 0.6 06/28/2021 07:32:36 -7 2093 0.0 5.09 141.8 0.6 06/28/2021 07:32:56 -10 2128 0.0 5.09 141.8 0.6 06/28/2021 07:33:16 -12 2134 0.0 5.09 141.8 0.6 06/28/2021 07:33:36 -10 2117 0.0 5.09 141.8 0.6 06/28/2021 07:33:56 -11 2123 0.0 5.09 141.8 0.6 06/28/2021 07:34:16 -7 2074 0.0 5.09 141.8 0.6 06/28/2021 07:34:36 -12 1987 0.0 5.09 141.8 0.6 06/28/2021 07:34:56 -7 2061 0.0 5.09 141.8 0.6 06/28/2021 07:35:16 -9 2076 0.0 5.09 141.8 0.6 06/28/2021 07:35:36 -5 2010 0.0 5.10 141.8 0.6 06/28/2021 07:35:56 -6 2004 0.0 5.09 141.8 0.6 06/28/2021 07:36:16 -16 2027 0.0 5.09 141.8 0.6 06/28/2021 07:36:36 -12 2034 0.0 5.09 141.8 0.6 06/28/2021 07:36:56 -10 1959 0.0 5.09 141.8 0.6 06/28/2021 07:37:16 -6 1981 0.0 5.09 141.8 0.6 06/28/2021 07:37:36 -11 2026 0.0 5.09 141.8 0.6 06/28/2021 07:37:56 -5 1948 0.0 5.09 141.8 0.6 06/28/2021 07:38:16 -4 1939 0.0 5.09 141.8 0.6 06/28/2021 07:38:36 -9 1981 0.0 5.09 141.8 0.6 06/28/2021 07:38:56 -5 2000 0.0 5.09 141.8 0.6 06/28/2021 07:39:16 -4 1917 0.0 5.09 141.8 0.6 06/28/2021 07:39:36 -8 1910 0.0 5.09 141.8 0.6 06/28/2021 07:39:56 -8 1973 0.0 5.09 141.8 0.6 Page 80 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 07:40:36 -4 1996 0.0 5.10 141.8 0.6 06/28/2021 07:40:56 -10 1970 0.0 5.09 141.8 0.6 06/28/2021 07:41:16 -9 1995 0.0 5.09 141.8 0.6 06/28/2021 07:41:36 -9 2061 0.0 5.09 141.8 0.6 06/28/2021 07:41:56 -1 2167 0.0 5.09 141.8 0.6 06/28/2021 07:42:16 -5 2122 0.0 5.09 141.8 0.6 06/28/2021 07:42:36 -3 2162 0.0 5.10 141.8 0.6 06/28/2021 07:42:56 -13 2100 0.0 5.09 141.8 0.6 06/28/2021 07:43:16 -12 2108 0.0 5.09 141.8 0.6 06/28/2021 07:43:36 -13 2114 0.0 5.09 141.8 0.6 06/28/2021 07:43:56 -10 2127 0.0 5.09 141.8 0.6 06/28/2021 07:44:16 -8 2156 0.0 5.09 141.8 0.6 06/28/2021 07:44:36 -5 2042 0.0 5.09 141.8 0.6 06/28/2021 07:44:56 -5 2056 0.0 5.09 141.8 0.6 06/28/2021 07:45:16 -10 2082 0.0 5.09 141.8 0.6 06/28/2021 07:45:36 -4 2067 0.0 5.10 141.8 0.6 06/28/2021 07:45:56 -8 1966 0.0 5.09 141.8 0.6 06/28/2021 07:46:16 -10 2061 0.0 5.09 141.8 0.6 06/28/2021 07:46:36 -6 2031 0.0 5.09 141.8 0.6 06/28/2021 07:46:56 -12 1943 0.0 5.09 141.8 0.6 06/28/2021 07:47:16 -8 2025 0.0 5.09 141.8 0.6 06/28/2021 07:47:36 -8 2014 0.0 5.09 141.8 0.6 06/28/2021 07:47:56 -10 1920 0.0 5.10 141.8 0.6 06/28/2021 07:48:16 -6 2005 0.0 5.09 141.8 0.6 06/28/2021 07:48:36 -4 1934 0.0 5.09 141.8 0.6 06/28/2021 07:48:56 -1 1957 0.0 5.09 141.8 0.6 06/28/2021 07:49:16 -9 1978 0.0 5.09 141.8 0.6 06/28/2021 07:49:36 -7 1946 0.0 5.09 141.8 0.6 06/28/2021 07:49:56 -9 1843 0.0 5.10 141.8 0.6 06/28/2021 07:50:16 -7 1933 0.0 5.09 141.8 0.6 06/28/2021 07:50:36 -7 1988 0.0 5.09 141.8 0.6 06/28/2021 07:50:56 -1 1997 0.0 5.09 141.8 0.6 06/28/2021 07:51:16 -3 1977 0.0 5.10 141.8 0.6 06/28/2021 07:51:36 -9 1936 0.0 5.09 141.8 0.6 06/28/2021 07:51:56 -12 1960 0.0 5.10 141.8 0.6 06/28/2021 07:52:16 -8 2011 0.0 5.09 141.8 0.6 06/28/2021 07:52:36 -11 2060 0.0 5.10 141.8 0.6 06/28/2021 07:52:56 -7 2125 0.0 5.09 141.8 0.6 06/28/2021 07:53:16 -7 2083 0.0 5.09 141.8 0.6 06/28/2021 07:53:36 -4 2084 0.0 5.10 141.8 0.6 06/28/2021 07:53:56 -4 2138 0.0 5.09 141.8 0.6 06/28/2021 07:54:16 -0 2163 0.0 5.09 141.8 0.6 06/28/2021 07:54:36 -11 2087 0.0 5.09 141.8 0.6 06/28/2021 07:54:56 -13 2099 0.0 5.09 141.8 0.6 06/28/2021 07:55:16 -12 2114 0.0 5.10 141.8 0.6 06/28/2021 07:55:36 -9 2154 0.0 5.09 141.8 0.6 06/28/2021 07:55:56 -4 2154 0.0 5.10 141.8 0.6 06/28/2021 07:56:16 -14 2101 0.0 5.10 141.8 0.6 06/28/2021 07:56:36 -8 2076 0.0 5.09 141.8 0.6 06/28/2021 07:56:56 -9 2026 0.0 5.09 141.8 0.6 06/28/2021 07:57:16 -3 2073 0.0 5.09 141.8 0.6 06/28/2021 07:57:36 -6 2045 0.0 5.09 141.8 0.6 06/28/2021 07:57:56 -10 2035 0.0 5.09 141.8 0.6 06/28/2021 07:58:16 -6 2019 0.0 5.10 141.8 0.6 Page 81 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 07:58:56 -5 2012 0.0 5.09 141.8 0.6 06/28/2021 07:59:16 -6 1982 0.0 5.09 141.8 0.6 06/28/2021 07:59:36 -6 1990 0.0 5.10 141.8 0.6 06/28/2021 07:59:56 -5 1958 0.0 5.10 141.8 0.6 06/28/2021 08:00:16 -7 1985 0.0 5.09 141.8 0.6 06/28/2021 08:00:36 -7 1945 0.0 5.09 141.8 0.6 06/28/2021 08:00:56 -7 1968 0.0 5.09 141.8 0.6 06/28/2021 08:01:16 -8 1915 0.0 5.09 141.8 0.6 06/28/2021 08:01:36 -5 1972 0.0 5.09 141.8 0.6 06/28/2021 08:01:56 -8 1896 0.0 5.10 141.8 0.6 06/28/2021 08:02:16 -11 1906 0.0 5.09 141.8 0.6 06/28/2021 08:02:36 -4 1984 0.0 5.10 141.8 0.6 06/28/2021 08:02:56 -5 1978 0.0 5.09 141.8 0.6 06/28/2021 08:03:16 -5 2016 0.0 5.09 141.8 0.6 06/28/2021 08:03:36 -3 2041 0.0 5.09 141.8 0.6 06/28/2021 08:03:56 -5 2058 0.0 5.10 141.8 0.6 06/28/2021 08:04:16 -9 2053 0.0 5.10 141.8 0.6 06/28/2021 08:04:36 -12 2093 0.0 5.09 141.8 0.6 06/28/2021 08:04:56 -7 2115 0.0 5.09 141.8 0.6 06/28/2021 08:05:16 -6 2108 0.0 5.10 141.8 0.6 06/28/2021 08:05:36 -5 2148 0.0 5.10 141.8 0.6 06/28/2021 08:05:56 -8 2101 0.0 5.10 141.8 0.6 06/28/2021 08:06:16 -9 2070 0.0 5.09 141.8 0.6 06/28/2021 08:06:36 -9 2072 0.0 5.10 141.8 0.6 06/28/2021 08:06:56 -2 2047 0.0 5.10 141.8 0.6 06/28/2021 08:07:16 -10 2051 0.0 5.09 141.8 0.6 06/28/2021 08:07:36 -6 2022 0.0 5.10 141.8 0.6 06/28/2021 08:07:56 -11 2024 0.0 5.09 141.8 0.6 06/28/2021 08:08:16 -5 1991 0.0 5.09 141.8 0.6 06/28/2021 08:08:36 -6 2002 0.0 5.10 141.8 0.6 06/28/2021 08:08:56 -10 1982 0.0 5.10 141.8 0.6 06/28/2021 08:09:16 -7 1954 0.0 5.10 141.8 0.6 06/28/2021 08:09:36 -11 1972 0.0 5.09 141.8 0.6 06/28/2021 08:09:56 -7 1928 0.0 5.10 141.8 0.6 06/28/2021 08:10:16 -5 1949 0.0 5.10 141.8 0.6 06/28/2021 08:10:36 -12 1943 0.0 5.10 141.8 0.6 06/28/2021 08:10:56 -7 1898 0.0 5.10 141.8 0.6 06/28/2021 08:11:16 -10 1959 0.0 5.10 141.8 0.6 06/28/2021 08:11:36 -9 1883 0.0 5.10 141.8 0.6 06/28/2021 08:11:56 -9 1914 0.0 5.09 141.8 0.6 06/28/2021 08:12:16 -8 1966 0.0 5.10 141.8 0.6 06/28/2021 08:12:36 -7 2018 0.0 5.10 141.8 0.6 06/28/2021 08:12:56 -7 2063 0.0 5.10 141.8 0.6 06/28/2021 08:13:16 -5 2107 0.0 5.09 141.8 0.6 06/28/2021 08:13:36 -9 2129 0.0 5.10 141.8 0.6 06/28/2021 08:13:56 -4 2173 0.0 5.09 141.8 0.6 06/28/2021 08:14:16 -9 2143 0.0 5.09 141.8 0.6 06/28/2021 08:14:36 -12 2161 0.0 5.10 141.8 0.6 06/28/2021 08:14:56 -7 2211 0.0 5.10 141.8 0.6 06/28/2021 08:15:16 -6 2133 0.0 5.09 141.8 0.6 06/28/2021 08:15:36 -9 2160 0.0 5.10 141.8 0.6 06/28/2021 08:15:56 -4 2218 0.0 5.10 141.8 0.6 06/28/2021 08:16:16 -10 2132 0.0 5.09 141.8 0.6 06/28/2021 08:16:36 -10 2167 0.0 5.09 141.8 0.6 Page 82 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 08:17:16 -4 2198 0.0 5.10 141.8 0.6 06/28/2021 08:17:36 -11 2146 0.0 5.10 141.8 0.6 06/28/2021 08:17:56 -12 2141 0.0 5.10 141.8 0.6 06/28/2021 08:18:16 -4 2205 0.0 5.10 141.8 0.6 06/28/2021 08:18:36 -9 2196 0.0 5.10 141.8 0.6 06/28/2021 08:18:56 -5 2180 0.0 5.10 141.8 0.6 06/28/2021 08:19:16 -5 2158 0.0 5.10 141.8 0.6 06/28/2021 08:19:36 -7 2157 0.0 5.10 141.8 0.6 06/28/2021 08:19:56 -3 2193 0.0 5.09 141.8 0.6 06/28/2021 08:20:16 -9 2150 0.0 5.10 141.8 0.6 06/28/2021 08:20:36 -7 2167 0.0 5.10 141.8 0.6 06/28/2021 08:20:56 -9 2157 0.0 5.09 141.8 0.6 06/28/2021 08:21:16 -11 2117 0.0 5.10 141.8 0.6 06/28/2021 08:21:36 -5 2213 0.0 5.10 141.8 0.6 06/28/2021 08:21:56 -5 2151 0.0 5.09 141.8 0.6 06/28/2021 08:22:16 -7 2154 0.0 5.09 141.8 0.6 06/28/2021 08:22:36 -8 2162 0.0 5.10 141.8 0.6 06/28/2021 08:22:56 -13 2144 0.0 5.10 141.8 0.6 06/28/2021 08:23:16 -12 2161 0.0 5.10 141.8 0.6 06/28/2021 08:23:36 -8 2212 0.0 5.10 141.8 0.6 06/28/2021 08:23:56 -10 2194 0.0 5.10 141.8 0.6 06/28/2021 08:24:16 -12 2198 0.0 5.09 141.8 0.6 06/28/2021 08:24:36 -14 2194 0.0 5.10 141.8 0.6 06/28/2021 08:24:56 -12 2189 0.0 5.10 141.8 0.6 06/28/2021 08:25:16 -11 2199 0.0 5.10 141.8 0.6 06/28/2021 08:25:36 -12 2190 0.0 5.10 141.8 0.6 06/28/2021 08:25:56 -14 2184 0.0 5.09 141.8 0.6 06/28/2021 08:26:16 -9 2197 0.0 5.10 141.8 0.6 06/28/2021 08:26:36 -13 2188 0.0 5.09 141.8 0.6 06/28/2021 08:26:56 -13 2188 0.0 5.10 141.8 0.6 06/28/2021 08:27:16 -11 2193 0.0 5.10 141.8 0.6 06/28/2021 08:27:36 -11 2196 0.0 5.10 141.8 0.6 06/28/2021 08:27:56 -12 2186 0.0 5.10 141.8 0.6 06/28/2021 08:28:16 -11 2190 0.0 5.10 141.8 0.6 06/28/2021 08:28:36 -13 2196 0.0 5.10 141.8 0.6 06/28/2021 08:28:56 -13 2194 0.0 5.10 141.8 0.6 06/28/2021 08:29:16 -12 2186 0.0 5.10 141.8 0.6 06/28/2021 08:29:36 -11 2195 0.0 5.10 141.8 0.6 06/28/2021 08:29:56 -12 2191 0.0 5.10 141.8 0.6 06/28/2021 08:30:16 -11 2194 0.0 5.10 141.8 0.6 06/28/2021 08:30:36 -14 2186 0.0 5.10 141.8 0.6 06/28/2021 08:30:56 -12 2188 0.0 5.10 141.8 0.6 06/28/2021 08:31:16 -11 2197 0.0 5.10 141.8 0.6 06/28/2021 08:31:36 -13 2051 0.0 5.10 141.8 0.6 06/28/2021 08:31:56 -10 1568 0.0 5.10 141.8 0.6 06/28/2021 08:32:16 -10 972 0.0 5.10 141.8 0.6 06/28/2021 08:32:36 -13 254 0.0 5.10 141.8 0.6 06/28/2021 08:32:56 -12 74 0.0 5.10 141.8 0.6 06/28/2021 08:33:16 -15 63 0.0 5.10 141.8 0.6 06/28/2021 08:33:36 -18 67 0.0 5.10 141.8 0.6 06/28/2021 08:33:56 -15 63 0.0 5.10 141.8 0.6 06/28/2021 08:34:16 -16 63 0.0 5.10 141.8 0.6 06/28/2021 08:34:36 -17 64 0.0 5.10 141.8 0.6 06/28/2021 08:34:56 -14 65 0.0 5.10 141.8 0.6 Page 83 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 08:35:36 -15 66 0.0 5.10 141.8 0.6 06/28/2021 08:35:56 -16 64 0.0 5.10 141.8 0.6 06/28/2021 08:36:16 -17 64 0.0 5.10 141.8 0.6 06/28/2021 08:36:36 -15 65 0.0 5.10 141.8 0.6 06/28/2021 08:36:56 -15 65 0.0 5.10 141.8 0.6 06/28/2021 08:37:16 -16 63 0.0 5.10 141.8 0.6 06/28/2021 08:37:36 -17 64 0.0 5.10 141.8 0.6 06/28/2021 08:37:56 -19 64 0.0 5.10 141.8 0.6 06/28/2021 08:38:16 -14 63 0.0 5.10 141.8 0.6 06/28/2021 08:38:36 -15 62 0.0 5.10 141.8 0.6 06/28/2021 08:38:56 -15 66 0.0 5.10 141.8 0.6 06/28/2021 08:39:16 -15 65 0.0 5.10 141.8 0.6 06/28/2021 08:39:36 -18 68 0.0 5.10 141.8 0.6 06/28/2021 08:39:56 -16 65 0.0 5.10 141.8 0.6 06/28/2021 08:40:16 -16 66 0.0 5.10 141.8 0.6 06/28/2021 08:40:36 -15 62 0.0 5.10 141.8 0.6 06/28/2021 08:40:56 -14 97 0.0 5.10 141.8 0.6 06/28/2021 08:41:16 -11 99 0.0 5.10 141.8 0.6 06/28/2021 08:41:36 -12 97 0.0 5.10 141.8 0.6 06/28/2021 08:41:56 -11 92 0.0 5.10 141.8 0.6 06/28/2021 08:42:16 -10 97 0.0 5.10 141.8 0.6 06/28/2021 08:42:36 -12 94 0.0 5.10 141.8 0.6 06/28/2021 08:42:56 -12 105 0.0 5.10 141.8 0.6 06/28/2021 08:43:16 -11 130 0.0 5.10 141.8 0.6 06/28/2021 08:43:36 -8 124 0.0 5.10 141.8 0.6 06/28/2021 08:43:56 -12 127 0.0 5.10 141.8 0.6 06/28/2021 08:44:16 -9 184 0.0 5.10 141.8 0.6 06/28/2021 08:44:36 -10 342 0.0 5.10 141.8 0.6 06/28/2021 08:44:56 -8 542 0.0 5.10 141.8 0.6 06/28/2021 08:45:16 -9 738 0.0 5.10 141.8 0.6 06/28/2021 08:45:36 -11 919 0.0 5.10 141.8 0.6 06/28/2021 08:45:56 -9 1085 0.0 5.09 141.8 0.6 06/28/2021 08:46:16 -12 1237 0.0 5.10 141.8 0.6 06/28/2021 08:46:36 -10 1402 0.0 5.10 141.8 0.6 06/28/2021 08:46:56 -13 1570 0.0 5.10 141.8 0.6 06/28/2021 08:47:16 -10 1728 0.0 5.10 141.8 0.6 06/28/2021 08:47:36 -9 1916 0.0 5.10 141.8 0.6 06/28/2021 08:47:56 -10 2090 0.0 5.10 141.8 0.6 06/28/2021 08:48:16 -11 2281 0.0 5.10 141.8 0.6 06/28/2021 08:48:36 -10 2464 0.0 5.10 141.8 0.6 06/28/2021 08:48:56 -11 2644 0.0 5.10 141.8 0.6 06/28/2021 08:49:16 -9 2835 0.0 5.10 141.8 0.6 06/28/2021 08:49:36 -7 3030 0.0 5.10 141.8 0.6 06/28/2021 08:49:56 -9 3221 0.0 5.10 141.8 0.6 06/28/2021 08:50:16 -7 3430 0.0 5.10 141.8 0.6 06/28/2021 08:50:36 -9 162 0.0 5.10 141.8 0.6 06/28/2021 08:50:56 -10 209 0.0 5.10 141.8 0.6 06/28/2021 08:51:16 -9 207 0.0 5.10 141.8 0.6 06/28/2021 08:51:36 -9 207 0.0 5.10 141.8 0.6 06/28/2021 08:51:56 -11 207 0.0 5.10 141.8 0.6 06/28/2021 08:52:16 -8 212 0.0 5.10 141.8 0.6 06/28/2021 08:52:36 -15 177 0.0 5.10 141.8 0.6 06/28/2021 08:52:56 -15 175 0.0 5.10 141.8 0.6 06/28/2021 08:53:16 -16 198 0.0 5.10 141.8 0.6 Page 84 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 08:53:56 -13 204 0.0 5.10 141.8 0.6 06/28/2021 08:54:16 -13 201 0.0 5.10 141.8 0.6 06/28/2021 08:54:36 -15 204 0.0 5.10 141.8 0.6 06/28/2021 08:54:56 -15 202 0.0 5.10 141.8 0.6 06/28/2021 08:55:16 -13 195 0.0 5.10 141.8 0.6 06/28/2021 08:55:36 -14 198 0.0 5.11 141.8 0.6 06/28/2021 08:55:56 -17 203 0.0 5.10 141.8 0.6 06/28/2021 08:56:16 -12 201 0.0 5.10 141.8 0.6 06/28/2021 08:56:36 -15 233 0.0 5.10 141.8 0.6 06/28/2021 08:56:56 -14 233 0.0 5.10 141.8 0.6 06/28/2021 08:57:16 -13 235 0.0 5.10 141.8 0.6 06/28/2021 08:57:36 -15 234 0.0 5.10 141.8 0.6 06/28/2021 08:57:56 -16 224 0.0 5.10 141.8 0.6 06/28/2021 08:58:16 -14 223 0.0 5.11 141.8 0.6 06/28/2021 08:58:36 -12 229 0.0 5.10 141.8 0.6 06/28/2021 08:58:56 -10 230 0.0 5.10 141.8 0.6 06/28/2021 08:59:16 -14 264 0.0 5.10 141.8 0.6 06/28/2021 08:59:32 -14 263 0.0 5.10 141.8 0.6 STAGE TOOL OPEN 06/28/2021 08:59:36 -12 270 0.0 5.10 141.8 0.6 06/28/2021 08:59:54 -12 269 0.0 5.10 141.8 0.6 RIG CIRCULATING BOTTOMS UP 06/28/2021 08:59:56 -15 269 0.0 5.10 141.8 0.6 06/28/2021 09:00:16 -14 261 0.0 5.10 141.8 0.6 06/28/2021 09:00:36 -14 266 0.0 5.10 141.8 0.6 06/28/2021 09:00:56 -14 267 0.0 5.10 141.8 0.6 06/28/2021 09:01:16 -14 307 0.0 5.10 141.8 0.6 06/28/2021 09:01:36 -16 300 0.0 5.10 141.8 0.6 06/28/2021 09:02:16 -14 314 0.0 5.10 141.8 0.6 06/28/2021 09:02:36 -14 310 0.0 5.10 141.8 0.6 06/28/2021 09:02:56 -12 312 0.0 5.10 141.8 0.6 06/28/2021 09:03:16 -12 310 0.0 5.10 141.8 0.6 06/28/2021 09:03:36 -15 299 0.0 5.11 141.8 0.6 06/28/2021 09:03:56 -14 360 0.0 5.10 141.8 0.6 06/28/2021 09:04:16 -16 353 0.0 5.10 141.8 0.6 06/28/2021 09:04:36 -15 346 0.0 5.10 141.8 0.6 06/28/2021 09:04:56 -15 348 0.0 5.10 141.8 0.6 06/28/2021 09:05:16 -14 348 0.0 5.10 141.8 0.6 06/28/2021 09:05:36 -14 355 0.0 5.10 141.8 0.6 06/28/2021 09:05:56 -15 352 0.0 5.10 141.8 0.6 06/28/2021 09:06:16 -16 354 0.0 5.10 141.8 0.6 06/28/2021 09:06:36 -17 355 0.0 5.11 141.8 0.6 06/28/2021 09:06:37 -11 348 0.0 5.11 141.8 0.6 STAGE 1 CLOSING PLUG LANDED @ 4276 STROKES 06/28/2021 09:06:56 -13 351 0.0 5.10 141.8 0.6 06/28/2021 09:07:00 -15 359 0.0 5.10 141.8 0.6 CEMENT SCALED 15.7 HEAVY FOR STAGE 1 06/28/2021 09:07:06 -14 350 0.0 5.10 141.8 0.6 Reset Total, Vol = 0.62 bbl 06/28/2021 09:07:16 -12 353 0.0 5.10 0.0 0.0 06/28/2021 09:07:36 -14 337 0.0 5.10 0.0 0.0 06/28/2021 09:07:56 -11 337 0.0 5.10 0.0 0.0 06/28/2021 09:08:16 -13 336 0.0 5.10 0.0 0.0 06/28/2021 09:08:36 -13 349 0.0 5.10 0.0 0.0 06/28/2021 09:08:56 -12 345 0.0 5.11 0.0 0.0 06/28/2021 09:09:16 -14 348 0.0 5.10 0.0 0.0 06/28/2021 09:09:36 -13 346 0.0 5.10 0.0 0.0 06/28/2021 09:09:56 -13 348 0.0 5.10 0.0 0.0 06/28/2021 09:10:16 -14 346 0.0 5.10 0.0 0.0 Page 85 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 09:10:56 -14 338 0.0 5.11 0.0 0.0 06/28/2021 09:11:16 -12 339 0.0 5.10 0.0 0.0 06/28/2021 09:11:36 -13 339 0.0 5.10 0.0 0.0 06/28/2021 09:11:56 -11 336 0.0 5.10 0.0 0.0 06/28/2021 09:12:16 -15 342 0.0 5.10 0.0 0.0 06/28/2021 09:12:36 -16 340 0.0 5.11 0.0 0.0 06/28/2021 09:12:56 -12 339 0.0 5.11 0.0 0.0 06/28/2021 09:13:16 -12 344 0.0 5.10 0.0 0.0 06/28/2021 09:13:36 -14 347 0.0 5.11 0.0 0.0 06/28/2021 09:13:56 -15 343 0.0 5.10 0.0 0.0 06/28/2021 09:14:16 -14 339 0.0 5.11 0.0 0.0 06/28/2021 09:14:36 -15 331 0.0 5.11 0.0 0.0 06/28/2021 09:14:56 -13 332 0.0 5.11 0.0 0.0 06/28/2021 09:15:16 -16 332 0.0 5.11 0.0 0.0 06/28/2021 09:15:36 -15 345 0.0 5.10 0.0 0.0 06/28/2021 09:15:56 -13 340 0.0 5.10 0.0 0.0 06/28/2021 09:16:16 -15 340 0.0 5.10 0.0 0.0 06/28/2021 09:16:36 -11 341 0.0 5.11 0.0 0.0 06/28/2021 09:16:56 -14 338 0.0 5.10 0.0 0.0 06/28/2021 09:17:16 -13 338 0.0 5.10 0.0 0.0 06/28/2021 09:17:36 -14 344 0.0 5.10 0.0 0.0 06/28/2021 09:17:56 -13 331 0.0 5.11 0.0 0.0 06/28/2021 09:18:16 -16 327 0.0 5.10 0.0 0.0 06/28/2021 09:18:36 -14 329 0.0 5.10 0.0 0.0 06/28/2021 09:18:56 -13 340 0.0 5.11 0.0 0.0 06/28/2021 09:19:16 -15 342 0.0 5.11 0.0 0.0 06/28/2021 09:19:36 -14 341 0.0 5.11 0.0 0.0 06/28/2021 09:19:56 -14 335 0.0 5.10 0.0 0.0 06/28/2021 09:20:16 -16 339 0.0 5.10 0.0 0.0 06/28/2021 09:20:36 -13 338 0.0 5.10 0.0 0.0 06/28/2021 09:20:56 -13 336 0.0 5.10 0.0 0.0 06/28/2021 09:21:16 -13 332 0.0 5.10 0.0 0.0 06/28/2021 09:21:36 -12 333 0.0 5.10 0.0 0.0 06/28/2021 09:21:56 -14 329 0.0 5.10 0.0 0.0 06/28/2021 09:22:16 -15 330 0.0 5.11 0.0 0.0 06/28/2021 09:22:36 -14 330 0.0 5.10 0.0 0.0 06/28/2021 09:22:56 -14 336 0.0 5.10 0.0 0.0 06/28/2021 09:23:16 -12 336 0.0 5.10 0.0 0.0 06/28/2021 09:23:36 -14 337 0.0 5.11 0.0 0.0 06/28/2021 09:23:56 -14 340 0.0 5.11 0.0 0.0 06/28/2021 09:24:16 -13 337 0.0 5.11 0.0 0.0 06/28/2021 09:24:36 -15 339 0.0 5.10 0.0 0.0 06/28/2021 09:24:56 -13 329 0.0 5.11 0.0 0.0 06/28/2021 09:25:16 -14 329 0.0 5.11 0.0 0.0 06/28/2021 09:25:36 -14 326 0.0 5.11 0.0 0.0 06/28/2021 09:25:56 -15 330 0.0 5.10 0.0 0.0 06/28/2021 09:26:16 -11 337 0.0 5.10 0.0 0.0 06/28/2021 09:26:36 -16 335 0.0 5.10 0.0 0.0 06/28/2021 09:26:56 -16 335 0.0 5.11 0.0 0.0 06/28/2021 09:27:16 -16 337 0.0 5.11 0.0 0.0 06/28/2021 09:27:36 -12 340 0.0 5.10 0.0 0.0 06/28/2021 09:27:56 -10 344 0.0 5.11 0.0 0.0 06/28/2021 09:28:16 -15 331 0.0 5.10 0.0 0.0 06/28/2021 09:28:36 -14 330 0.0 5.10 0.0 0.0 Page 86 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 09:29:16 -13 335 0.0 5.11 0.0 0.0 06/28/2021 09:29:36 -12 340 0.0 5.10 0.0 0.0 06/28/2021 09:29:56 -14 346 0.0 5.11 0.0 0.0 06/28/2021 09:30:16 -13 340 0.0 5.10 0.0 0.0 06/28/2021 09:30:36 -12 343 0.0 5.11 0.0 0.0 06/28/2021 09:30:56 -11 344 0.0 5.10 0.0 0.0 06/28/2021 09:31:16 -12 344 0.0 5.10 0.0 0.0 06/28/2021 09:31:36 -13 340 0.0 5.11 0.0 0.0 06/28/2021 09:31:56 -12 334 0.0 5.11 0.0 0.0 06/28/2021 09:32:16 -14 336 0.0 5.10 0.0 0.0 06/28/2021 09:32:36 -13 336 0.0 5.11 0.0 0.0 06/28/2021 09:32:56 -13 336 0.0 5.11 0.0 0.0 06/28/2021 09:33:16 -12 342 0.0 5.11 0.0 0.0 06/28/2021 09:33:36 -14 341 0.0 5.11 0.0 0.0 06/28/2021 09:33:56 -13 340 0.0 5.11 0.0 0.0 06/28/2021 09:34:16 -14 345 0.0 5.10 0.0 0.0 06/28/2021 09:34:36 -14 341 0.0 5.11 0.0 0.0 06/28/2021 09:34:56 -13 345 0.0 5.11 0.0 0.0 06/28/2021 09:35:16 -13 344 0.0 5.11 0.0 0.0 06/28/2021 09:35:36 -13 332 0.0 5.10 0.0 0.0 06/28/2021 09:35:56 -14 333 0.0 5.10 0.0 0.0 06/28/2021 09:36:16 -10 332 0.0 5.11 0.0 0.0 06/28/2021 09:36:36 -14 350 0.0 5.11 0.0 0.0 06/28/2021 09:36:56 -12 348 0.0 5.11 0.0 0.0 06/28/2021 09:37:16 -15 347 0.0 5.11 0.0 0.0 06/28/2021 09:37:36 -13 349 0.0 5.11 0.0 0.0 06/28/2021 09:37:56 -14 348 0.0 5.11 0.0 0.0 06/28/2021 09:38:16 -13 352 0.0 5.10 0.0 0.0 06/28/2021 09:38:36 -15 343 0.0 5.11 0.0 0.0 06/28/2021 09:38:56 -14 336 0.0 5.11 0.0 0.0 06/28/2021 09:39:16 -11 336 0.0 5.11 0.0 0.0 06/28/2021 09:39:36 -13 340 0.0 5.11 0.0 0.0 06/28/2021 09:39:56 -12 344 0.0 5.10 0.0 0.0 06/28/2021 09:40:16 -13 347 0.0 5.11 0.0 0.0 06/28/2021 09:40:36 -16 350 0.0 5.11 0.0 0.0 06/28/2021 09:40:56 -13 348 0.0 5.11 0.0 0.0 06/28/2021 09:41:16 -14 350 0.0 5.11 0.0 0.0 06/28/2021 09:41:36 -13 353 0.0 5.11 0.0 0.0 06/28/2021 09:41:56 -13 348 0.0 5.11 0.0 0.0 06/28/2021 09:42:16 -12 346 0.0 5.11 0.0 0.0 06/28/2021 09:42:36 -14 334 0.0 5.11 0.0 0.0 06/28/2021 09:42:56 -14 340 0.0 5.11 0.0 0.0 06/28/2021 09:43:16 -15 343 0.0 5.11 0.0 0.0 06/28/2021 09:43:36 -14 346 0.0 5.11 0.0 0.0 06/28/2021 09:43:56 -12 346 0.0 5.11 0.0 0.0 06/28/2021 09:44:16 -14 346 0.0 5.11 0.0 0.0 06/28/2021 09:44:36 -12 349 0.0 5.11 0.0 0.0 06/28/2021 09:44:56 -14 353 0.0 5.11 0.0 0.0 06/28/2021 09:45:16 -14 350 0.0 5.11 0.0 0.0 06/28/2021 09:45:36 -12 341 0.0 5.11 0.0 0.0 06/28/2021 09:45:56 -14 338 0.0 5.11 0.0 0.0 06/28/2021 09:46:16 -14 338 0.0 5.11 0.0 0.0 06/28/2021 09:46:36 -13 353 0.0 5.11 0.0 0.0 06/28/2021 09:46:56 -14 353 0.0 5.11 0.0 0.0 Page 87 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 09:47:36 -15 350 0.0 5.11 0.0 0.0 06/28/2021 09:47:56 -17 349 0.0 5.11 0.0 0.0 06/28/2021 09:48:16 -14 353 0.0 5.10 0.0 0.0 06/28/2021 09:48:36 -14 348 0.0 5.11 0.0 0.0 06/28/2021 09:48:56 -15 344 0.0 5.11 0.0 0.0 06/28/2021 09:49:16 -13 340 0.0 5.11 0.0 0.0 06/28/2021 09:49:36 -13 340 0.0 5.11 0.0 0.0 06/28/2021 09:49:56 -12 346 0.0 5.11 0.0 0.0 06/28/2021 09:50:16 -14 350 0.0 5.11 0.0 0.0 06/28/2021 09:50:36 -14 353 0.0 5.11 0.0 0.0 06/28/2021 09:50:56 -14 353 0.0 5.11 0.0 0.0 06/28/2021 09:51:16 -14 355 0.0 5.11 0.0 0.0 06/28/2021 09:51:36 -15 348 0.0 5.11 0.0 0.0 06/28/2021 09:51:56 -13 351 0.0 5.11 0.0 0.0 06/28/2021 09:52:16 -14 352 0.0 5.11 0.0 0.0 06/28/2021 09:52:36 -13 348 0.0 5.11 0.0 0.0 06/28/2021 09:52:56 -15 339 0.0 5.11 0.0 0.0 06/28/2021 09:53:16 -14 336 0.0 5.11 0.0 0.0 06/28/2021 09:53:36 -14 340 0.0 5.11 0.0 0.0 06/28/2021 09:53:56 -13 339 0.0 5.11 0.0 0.0 06/28/2021 09:54:16 -15 349 0.0 5.11 0.0 0.0 06/28/2021 09:54:36 -14 345 0.0 5.11 0.0 0.0 06/28/2021 09:54:56 -12 350 0.0 5.11 0.0 0.0 06/28/2021 09:55:16 -15 351 0.0 5.11 0.0 0.0 06/28/2021 09:55:36 -17 357 0.0 5.11 0.0 0.0 06/28/2021 09:55:56 -15 356 0.0 5.11 0.0 0.0 06/28/2021 09:56:16 -14 339 0.0 5.11 0.0 0.0 06/28/2021 09:56:36 -15 340 0.0 5.11 0.0 0.0 06/28/2021 09:56:56 -11 336 0.0 5.11 0.0 0.0 06/28/2021 09:57:16 -14 351 0.0 5.11 0.0 0.0 06/28/2021 09:57:36 -14 349 0.0 5.11 0.0 0.0 06/28/2021 09:57:56 -10 351 0.0 5.11 0.0 0.0 06/28/2021 09:58:16 -12 348 0.0 5.11 0.0 0.0 06/28/2021 09:58:36 -14 350 0.0 5.11 0.0 0.0 06/28/2021 09:58:56 -14 352 0.0 5.11 0.0 0.0 06/28/2021 09:59:16 -14 348 0.0 5.11 0.0 0.0 06/28/2021 09:59:36 -12 344 0.0 5.11 0.0 0.0 06/28/2021 09:59:56 -13 340 0.0 5.11 0.0 0.0 06/28/2021 10:00:16 -12 342 0.0 5.11 0.0 0.0 06/28/2021 10:00:36 -14 346 0.0 5.11 0.0 0.0 06/28/2021 10:00:56 -18 350 0.0 5.11 0.0 0.0 06/28/2021 10:01:16 -15 348 0.0 5.12 0.0 0.0 06/28/2021 10:01:36 -15 350 0.0 5.11 0.0 0.0 06/28/2021 10:01:56 -14 349 0.0 5.12 0.0 0.0 06/28/2021 10:02:16 -14 348 0.0 5.12 0.0 0.0 06/28/2021 10:02:36 -14 356 0.0 5.11 0.0 0.0 06/28/2021 10:02:56 -14 355 0.0 5.11 0.0 0.0 06/28/2021 10:03:16 -13 343 0.0 5.11 0.0 0.0 06/28/2021 10:03:36 -14 340 0.0 5.11 0.0 0.0 06/28/2021 10:03:56 -15 342 0.0 5.11 0.0 0.0 06/28/2021 10:04:16 -15 346 0.0 5.11 0.0 0.0 06/28/2021 10:04:36 -14 349 0.0 5.11 0.0 0.0 06/28/2021 10:04:56 -14 347 0.0 5.11 0.0 0.0 06/28/2021 10:05:16 -13 347 0.0 5.11 0.0 0.0 Page 88 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 10:05:56 -14 351 0.0 5.11 0.0 0.0 06/28/2021 10:06:16 -14 350 0.0 5.11 0.0 0.0 06/28/2021 10:06:36 -13 338 0.0 5.11 0.0 0.0 06/28/2021 10:06:56 -15 337 0.0 5.12 0.0 0.0 06/28/2021 10:07:16 -12 334 0.0 5.11 0.0 0.0 06/28/2021 10:07:36 -15 351 0.0 5.11 0.0 0.0 06/28/2021 10:07:56 -12 349 0.0 5.11 0.0 0.0 06/28/2021 10:08:16 -12 350 0.0 5.11 0.0 0.0 06/28/2021 10:08:36 -15 344 0.0 5.11 0.0 0.0 06/28/2021 10:08:56 -15 346 0.0 5.11 0.0 0.0 06/28/2021 10:09:16 -15 349 0.0 5.11 0.0 0.0 06/28/2021 10:09:36 -14 351 0.0 5.11 0.0 0.0 06/28/2021 10:09:56 -15 340 0.0 5.11 0.0 0.0 06/28/2021 10:10:16 -14 337 0.0 5.11 0.0 0.0 06/28/2021 10:10:36 -14 336 0.0 5.11 0.0 0.0 06/28/2021 10:10:56 -13 338 0.0 5.11 0.0 0.0 06/28/2021 10:11:16 -13 345 0.0 5.12 0.0 0.0 06/28/2021 10:11:36 -16 347 0.0 5.12 0.0 0.0 06/28/2021 10:11:56 -15 345 0.0 5.11 0.0 0.0 06/28/2021 10:12:16 -12 349 0.0 5.11 0.0 0.0 06/28/2021 10:12:36 -12 346 0.0 5.12 0.0 0.0 06/28/2021 10:12:56 -14 351 0.0 5.11 0.0 0.0 06/28/2021 10:13:16 -14 348 0.0 5.11 0.0 0.0 06/28/2021 10:13:36 -12 345 0.0 5.11 0.0 0.0 06/28/2021 10:13:56 -14 341 0.0 5.12 0.0 0.0 06/28/2021 10:14:16 -13 338 0.0 5.11 0.0 0.0 06/28/2021 10:14:36 -14 338 0.0 5.11 0.0 0.0 06/28/2021 10:14:56 -14 342 0.0 5.12 0.0 0.0 06/28/2021 10:15:16 -15 348 0.0 5.11 0.0 0.0 06/28/2021 10:15:36 -17 346 0.0 5.11 0.0 0.0 06/28/2021 10:15:56 -14 346 0.0 5.12 0.0 0.0 06/28/2021 10:16:16 -14 351 0.0 5.11 0.0 0.0 06/28/2021 10:16:36 -12 348 0.0 5.12 0.0 0.0 06/28/2021 10:16:56 -14 350 0.0 5.11 0.0 0.0 06/28/2021 10:17:16 -12 336 0.0 5.11 0.0 0.0 06/28/2021 10:17:36 -15 334 0.0 5.11 0.0 0.0 06/28/2021 10:17:56 -12 331 0.0 5.12 0.0 0.0 06/28/2021 10:18:16 -13 345 0.0 5.12 0.0 0.0 06/28/2021 10:18:36 -12 348 0.0 5.12 0.0 0.0 06/28/2021 10:18:56 -14 343 0.0 5.11 0.0 0.0 06/28/2021 10:19:16 -13 343 0.0 5.11 0.0 0.0 06/28/2021 10:19:36 -16 339 0.0 5.12 0.0 0.0 06/28/2021 10:19:56 -15 345 0.0 5.11 0.0 0.0 06/28/2021 10:20:16 -11 345 0.0 5.12 0.0 0.0 06/28/2021 10:20:36 -14 332 0.0 5.11 0.0 0.0 06/28/2021 10:20:56 -13 332 0.0 5.12 0.0 0.0 06/28/2021 10:21:16 -18 329 0.0 5.11 0.0 0.0 06/28/2021 10:21:36 -13 338 0.0 5.11 0.0 0.0 06/28/2021 10:21:56 -12 338 0.0 5.12 0.0 0.0 06/28/2021 10:22:16 -15 345 0.0 5.12 0.0 0.0 06/28/2021 10:22:36 -15 340 0.0 5.12 0.0 0.0 06/28/2021 10:22:56 -12 341 0.0 5.12 0.0 0.0 06/28/2021 10:23:16 -16 347 0.0 5.12 0.0 0.0 06/28/2021 10:23:36 -14 346 0.0 5.11 0.0 0.0 Page 89 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 10:24:16 -13 340 0.0 5.12 0.0 0.0 06/28/2021 10:24:36 -14 329 0.0 5.12 0.0 0.0 06/28/2021 10:24:56 -16 330 0.0 5.11 0.0 0.0 06/28/2021 10:25:16 -14 330 0.0 5.12 0.0 0.0 06/28/2021 10:25:36 -16 344 0.0 5.12 0.0 0.0 06/28/2021 10:25:56 -14 340 0.0 5.12 0.0 0.0 06/28/2021 10:26:16 -13 340 0.0 5.12 0.0 0.0 06/28/2021 10:26:36 -14 342 0.0 5.12 0.0 0.0 06/28/2021 10:26:56 -14 346 0.0 5.11 0.0 0.0 06/28/2021 10:27:16 -13 346 0.0 5.12 0.0 0.0 06/28/2021 10:27:36 -16 331 0.0 5.12 0.0 0.0 06/28/2021 10:27:56 -14 330 0.0 5.12 0.0 0.0 06/28/2021 10:28:16 -16 331 0.0 5.12 0.0 0.0 06/28/2021 10:28:36 -15 338 0.0 5.12 0.0 0.0 06/28/2021 10:28:56 -15 339 0.0 5.12 0.0 0.0 06/28/2021 10:29:16 -16 342 0.0 5.12 0.0 0.0 06/28/2021 10:29:36 -17 342 0.0 5.12 0.0 0.0 06/28/2021 10:29:56 -14 343 0.0 5.12 0.0 0.0 06/28/2021 10:30:16 -14 340 0.0 5.12 0.0 0.0 06/28/2021 10:30:36 -14 342 0.0 5.12 0.0 0.0 06/28/2021 10:30:56 -13 338 0.0 5.12 0.0 0.0 06/28/2021 10:31:16 -11 335 0.0 5.12 0.0 0.0 06/28/2021 10:31:36 -12 328 0.0 5.12 0.0 0.0 06/28/2021 10:31:56 -10 334 0.0 5.12 0.0 0.0 06/28/2021 10:32:16 -12 333 0.0 5.12 0.0 0.0 06/28/2021 10:32:36 -14 336 0.0 5.12 0.0 0.0 06/28/2021 10:32:56 -12 337 0.0 5.12 0.0 0.0 06/28/2021 10:33:16 -13 333 0.0 5.12 0.0 0.0 06/28/2021 10:33:36 -13 337 0.0 5.11 0.0 0.0 06/28/2021 10:33:56 -14 342 0.0 5.11 0.0 0.0 06/28/2021 10:34:16 -14 345 0.0 5.12 0.0 0.0 06/28/2021 10:34:36 -15 340 0.0 5.12 0.0 0.0 06/28/2021 10:34:56 -12 337 0.0 5.12 0.0 0.0 06/28/2021 10:35:16 -12 329 0.0 5.12 0.0 0.0 06/28/2021 10:35:36 -13 328 0.0 5.11 0.0 0.0 06/28/2021 10:35:56 -14 330 0.0 5.12 0.0 0.0 06/28/2021 10:36:16 -13 340 0.0 5.12 0.0 0.0 06/28/2021 10:36:36 -14 337 0.0 5.12 0.0 0.0 06/28/2021 10:36:56 -16 338 0.0 5.12 0.0 0.0 06/28/2021 10:37:16 -16 338 0.0 5.12 0.0 0.0 06/28/2021 10:37:36 -11 336 0.0 5.12 0.0 0.0 06/28/2021 10:37:56 -14 338 0.0 5.12 0.0 0.0 06/28/2021 10:38:16 -17 326 0.0 5.12 0.0 0.0 06/28/2021 10:38:36 -12 327 0.0 5.12 0.0 0.0 06/28/2021 10:38:56 -15 328 0.0 5.12 0.0 0.0 06/28/2021 10:39:16 -14 332 0.0 5.12 0.0 0.0 06/28/2021 10:39:36 -13 332 0.0 5.12 0.0 0.0 06/28/2021 10:39:56 -15 337 0.0 5.12 0.0 0.0 06/28/2021 10:40:16 -12 336 0.0 5.12 0.0 0.0 06/28/2021 10:40:36 -12 334 0.0 5.12 0.0 0.0 06/28/2021 10:40:56 -14 339 0.0 5.12 0.0 0.0 06/28/2021 10:41:16 -15 334 0.0 5.12 0.0 0.0 06/28/2021 10:41:36 -15 329 0.0 5.12 0.0 0.0 06/28/2021 10:41:56 -13 326 0.0 5.12 0.0 0.0 Page 90 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 10:42:36 -15 322 0.0 5.12 0.0 0.0 06/28/2021 10:42:56 -15 323 0.0 5.12 0.0 0.0 06/28/2021 10:43:16 -17 325 0.0 5.12 0.0 0.0 06/28/2021 10:43:36 -12 332 0.0 5.12 0.0 0.0 06/28/2021 10:43:56 -16 336 0.0 5.12 0.0 0.0 06/28/2021 10:44:16 -13 333 0.0 5.12 0.0 0.0 06/28/2021 10:44:36 -12 338 0.0 5.12 0.0 0.0 06/28/2021 10:44:56 -13 336 0.0 5.12 0.0 0.0 06/28/2021 10:45:16 -14 332 0.0 5.12 0.0 0.0 06/28/2021 10:45:36 -14 321 0.0 5.12 0.0 0.0 06/28/2021 10:45:56 -14 321 0.0 5.12 0.0 0.0 06/28/2021 10:46:16 -14 322 0.0 5.12 0.0 0.0 06/28/2021 10:46:36 -13 331 0.0 5.12 0.0 0.0 06/28/2021 10:46:56 -14 328 0.0 5.12 0.0 0.0 06/28/2021 10:47:16 -13 329 0.0 5.12 0.0 0.0 06/28/2021 10:47:36 -12 333 0.0 5.12 0.0 0.0 06/28/2021 10:47:56 -12 336 0.0 5.12 0.0 0.0 06/28/2021 10:48:16 -12 336 0.0 5.12 0.0 0.0 06/28/2021 10:48:36 -14 334 0.0 5.12 0.0 0.0 06/28/2021 10:48:56 -13 322 0.0 5.12 0.0 0.0 06/28/2021 10:49:16 -13 323 0.0 5.12 0.0 0.0 06/28/2021 10:49:36 -13 322 0.0 5.11 0.0 0.0 06/28/2021 10:49:56 -12 325 0.0 5.12 0.0 0.0 06/28/2021 10:50:16 -15 327 0.0 5.12 0.0 0.0 06/28/2021 10:50:36 -15 326 0.0 5.12 0.0 0.0 06/28/2021 10:50:56 -16 328 0.0 5.12 0.0 0.0 06/28/2021 10:51:16 -13 326 0.0 5.12 0.0 0.0 06/28/2021 10:51:36 -15 333 0.0 5.12 0.0 0.0 06/28/2021 10:51:56 -15 331 0.0 5.12 0.0 0.0 06/28/2021 10:52:16 -16 326 0.0 5.12 0.0 0.0 06/28/2021 10:52:36 -12 315 0.0 5.12 0.0 0.0 06/28/2021 10:52:56 -16 316 0.0 5.12 0.0 0.0 06/28/2021 10:53:16 -13 316 0.0 5.12 0.0 0.0 06/28/2021 10:53:36 -13 320 0.0 5.12 0.0 0.0 06/28/2021 10:53:56 -14 324 0.0 5.12 0.0 0.0 06/28/2021 10:54:16 -14 324 0.0 5.12 0.0 0.0 06/28/2021 10:54:36 -14 325 0.0 5.13 0.0 0.0 06/28/2021 10:54:56 -13 328 0.0 5.12 0.0 0.0 06/28/2021 10:55:16 -13 324 0.0 5.12 0.0 0.0 06/28/2021 10:55:36 -14 322 0.0 5.12 0.0 0.0 06/28/2021 10:55:56 -13 328 0.0 5.13 0.0 0.0 06/28/2021 10:56:16 -12 314 0.0 5.12 0.0 0.0 06/28/2021 10:56:36 -13 314 0.0 5.12 0.0 0.0 06/28/2021 10:56:56 -14 312 0.0 5.12 0.0 0.0 06/28/2021 10:57:16 -13 326 0.0 5.12 0.0 0.0 06/28/2021 10:57:36 -14 324 0.0 5.12 0.0 0.0 06/28/2021 10:57:56 -16 326 0.0 5.12 0.0 0.0 06/28/2021 10:58:16 -15 324 0.0 5.12 0.0 0.0 06/28/2021 10:58:36 -13 323 0.0 5.12 0.0 0.0 06/28/2021 10:58:56 -11 326 0.0 5.12 0.0 0.0 06/28/2021 10:59:16 -14 318 0.0 5.12 0.0 0.0 06/28/2021 10:59:36 -14 314 0.0 5.12 0.0 0.0 06/28/2021 10:59:56 -14 314 0.0 5.13 0.0 0.0 06/28/2021 11:00:16 -14 319 0.0 5.12 0.0 0.0 Page 91 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 11:00:56 -16 319 0.0 5.12 0.0 0.0 06/28/2021 11:01:16 -13 324 0.0 5.12 0.0 0.0 06/28/2021 11:01:36 -16 322 0.0 5.12 0.0 0.0 06/28/2021 11:01:56 -16 327 0.0 5.13 0.0 0.0 06/28/2021 11:02:16 -14 328 0.0 5.12 0.0 0.0 06/28/2021 11:02:36 -13 328 0.0 5.12 0.0 0.0 06/28/2021 11:02:56 -12 328 0.0 5.12 0.0 0.0 06/28/2021 11:03:16 -15 313 0.0 5.12 0.0 0.0 06/28/2021 11:03:36 -14 314 0.0 5.12 0.0 0.0 06/28/2021 11:03:56 -14 316 0.0 5.12 0.0 0.0 06/28/2021 11:04:16 -15 322 0.0 5.12 0.0 0.0 06/28/2021 11:04:36 -15 325 0.0 5.12 0.0 0.0 06/28/2021 11:04:56 -14 327 0.0 5.12 0.0 0.0 06/28/2021 11:05:16 -16 326 0.0 5.12 0.0 0.0 06/28/2021 11:05:36 -14 327 0.0 5.12 0.0 0.0 06/28/2021 11:05:56 -14 324 0.0 5.12 0.0 0.0 06/28/2021 11:06:16 -13 317 0.0 5.12 0.0 0.0 06/28/2021 11:06:36 -15 313 0.0 5.12 0.0 0.0 06/28/2021 11:06:56 -12 324 0.0 5.12 0.0 0.0 06/28/2021 11:07:16 -13 326 0.0 5.12 0.0 0.0 06/28/2021 11:07:36 -13 326 0.0 5.12 0.0 0.0 06/28/2021 11:07:56 -13 324 0.0 5.12 0.0 0.0 06/28/2021 11:08:16 -16 325 0.0 5.12 0.0 0.0 06/28/2021 11:08:36 -14 313 0.0 5.12 0.0 0.0 06/28/2021 11:08:56 -14 312 0.0 5.13 0.0 0.0 06/28/2021 11:09:16 -14 325 0.0 5.12 0.0 0.0 06/28/2021 11:09:36 -14 322 0.0 5.12 0.0 0.0 06/28/2021 11:09:56 -15 327 0.0 5.13 0.0 0.0 06/28/2021 11:10:16 -15 325 0.0 5.12 0.0 0.0 06/28/2021 11:10:36 -14 324 0.0 5.13 0.0 0.0 06/28/2021 11:10:56 -14 327 0.0 5.12 0.0 0.0 06/28/2021 11:11:16 -13 322 0.0 5.13 0.0 0.0 06/28/2021 11:11:36 -13 320 0.0 5.13 0.0 0.0 06/28/2021 11:11:56 -13 314 0.0 5.13 0.0 0.0 06/28/2021 11:12:16 -14 311 0.0 5.12 0.0 0.0 06/28/2021 11:12:36 -15 314 0.0 5.12 0.0 0.0 06/28/2021 11:12:56 -12 315 0.0 5.12 0.0 0.0 06/28/2021 11:13:16 -18 319 0.0 5.13 0.0 0.0 06/28/2021 11:13:36 -12 323 0.0 5.13 0.0 0.0 06/28/2021 11:13:56 -15 324 0.0 5.13 0.0 0.0 06/28/2021 11:14:16 -15 323 0.0 5.12 0.0 0.0 06/28/2021 11:14:36 -15 328 0.0 5.12 0.0 0.0 06/28/2021 11:14:56 -16 322 0.0 5.13 0.0 0.0 06/28/2021 11:15:16 -13 320 0.0 5.12 0.0 0.0 06/28/2021 11:15:36 -12 310 0.0 5.13 0.0 0.0 06/28/2021 11:15:56 -13 312 0.0 5.13 0.0 0.0 06/28/2021 11:16:16 -14 311 0.0 5.12 0.0 0.0 06/28/2021 11:16:36 -14 325 0.0 5.12 0.0 0.0 06/28/2021 11:16:56 -14 320 0.0 5.12 0.0 0.0 06/28/2021 11:17:16 -14 317 0.0 5.13 0.0 0.0 06/28/2021 11:17:36 -15 320 0.0 5.13 0.0 0.0 06/28/2021 11:17:56 -15 324 0.0 5.13 0.0 0.0 06/28/2021 11:18:16 -14 321 0.0 5.13 0.0 0.0 06/28/2021 11:18:36 -15 325 0.0 5.12 0.0 0.0 Page 92 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 11:19:16 -16 312 0.0 5.12 0.0 0.0 06/28/2021 11:19:36 -14 310 0.0 5.12 0.0 0.0 06/28/2021 11:19:56 -15 317 0.0 5.12 0.0 0.0 06/28/2021 11:20:16 -15 321 0.0 5.13 0.0 0.0 06/28/2021 11:20:36 -12 322 0.0 5.12 0.0 0.0 06/28/2021 11:20:56 -14 320 0.0 5.13 0.0 0.0 06/28/2021 11:21:16 -14 318 0.0 5.12 0.0 0.0 06/28/2021 11:21:36 -15 319 0.0 5.12 0.0 0.0 06/28/2021 11:21:56 -15 319 0.0 5.13 0.0 0.0 06/28/2021 11:22:16 -15 318 0.0 5.12 0.0 0.0 06/28/2021 11:22:36 -15 312 0.0 5.13 0.0 0.0 06/28/2021 11:22:56 -13 314 0.0 5.12 0.0 0.0 06/28/2021 11:23:16 -14 309 0.0 5.13 0.0 0.0 06/28/2021 11:23:36 -15 312 0.0 5.13 0.0 0.0 06/28/2021 11:23:56 -14 322 0.0 5.13 0.0 0.0 06/28/2021 11:24:16 -15 319 0.0 5.13 0.0 0.0 06/28/2021 11:24:36 -15 318 0.0 5.12 0.0 0.0 06/28/2021 11:24:56 -14 318 0.0 5.13 0.0 0.0 06/28/2021 11:25:16 -14 319 0.0 5.13 0.0 0.0 06/28/2021 11:25:36 -15 321 0.0 5.12 0.0 0.0 06/28/2021 11:25:56 -14 308 0.0 5.12 0.0 0.0 06/28/2021 11:26:16 -15 310 0.0 5.13 0.0 0.0 06/28/2021 11:26:36 -15 310 0.0 5.13 0.0 0.0 06/28/2021 11:26:56 -16 308 0.0 5.12 0.0 0.0 06/28/2021 11:27:16 -14 319 0.0 5.13 0.0 0.0 06/28/2021 11:27:36 -14 321 0.0 5.12 0.0 0.0 06/28/2021 11:27:56 -13 321 0.0 5.12 0.0 0.0 06/28/2021 11:28:16 -10 320 0.0 5.12 0.0 0.0 06/28/2021 11:28:36 -12 321 0.0 5.13 0.0 0.0 06/28/2021 11:28:56 -16 322 0.0 5.12 0.0 0.0 06/28/2021 11:29:16 -11 317 0.0 5.13 0.0 0.0 06/28/2021 11:29:36 -17 312 0.0 5.12 0.0 0.0 06/28/2021 11:29:56 -16 312 0.0 5.12 0.0 0.0 06/28/2021 11:30:16 -14 307 0.0 5.12 0.0 0.0 06/28/2021 11:30:36 -17 313 0.0 5.13 0.0 0.0 06/28/2021 11:30:56 -16 315 0.0 5.12 0.0 0.0 06/28/2021 11:31:16 -13 317 0.0 5.13 0.0 0.0 06/28/2021 11:31:36 -12 319 0.0 5.13 0.0 0.0 06/28/2021 11:31:56 -15 321 0.0 5.12 0.0 0.0 06/28/2021 11:32:16 -14 322 0.0 5.12 0.0 0.0 06/28/2021 11:32:36 -14 320 0.0 5.13 0.0 0.0 06/28/2021 11:32:56 -15 319 0.0 5.13 0.0 0.0 06/28/2021 11:33:16 -13 315 0.0 5.13 0.0 0.0 06/28/2021 11:33:36 -14 309 0.0 5.13 0.0 0.0 06/28/2021 11:33:56 -17 309 0.0 5.13 0.0 0.0 06/28/2021 11:34:16 -15 310 0.0 5.12 0.0 0.0 06/28/2021 11:34:36 -14 318 0.0 5.13 0.0 0.0 06/28/2021 11:34:56 -15 317 0.0 5.12 0.0 0.0 06/28/2021 11:35:16 -16 317 0.0 5.12 0.0 0.0 06/28/2021 11:35:36 -14 321 0.0 5.13 0.0 0.0 06/28/2021 11:35:56 -14 320 0.0 5.13 0.0 0.0 06/28/2021 11:36:16 -12 321 0.0 5.12 0.0 0.0 06/28/2021 11:36:36 -16 306 0.0 5.12 0.0 0.0 06/28/2021 11:36:56 -14 311 0.0 5.13 0.0 0.0 Page 93 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 11:37:36 -12 318 0.0 5.13 0.0 0.0 06/28/2021 11:37:56 -12 318 0.0 5.13 0.0 0.0 06/28/2021 11:38:16 -14 321 0.0 5.12 0.0 0.0 06/28/2021 11:38:36 -12 316 0.0 5.13 0.0 0.0 06/28/2021 11:38:56 -12 318 0.0 5.12 0.0 0.0 06/28/2021 11:39:16 -12 320 0.0 5.13 0.0 0.0 06/28/2021 11:39:36 -9 320 0.0 5.13 0.0 0.0 06/28/2021 11:39:56 -7 315 0.0 5.13 0.0 0.0 06/28/2021 11:40:16 2 313 0.0 5.13 0.0 0.0 06/28/2021 11:40:36 20 309 0.0 5.13 0.0 0.0 06/28/2021 11:40:56 25 311 0.0 5.13 0.0 0.0 06/28/2021 11:41:16 25 312 0.0 5.12 0.0 0.0 06/28/2021 11:41:36 19 316 0.0 5.13 0.0 0.0 06/28/2021 11:41:56 42 318 0.0 5.13 0.0 0.0 06/28/2021 11:42:16 9 318 0.0 5.13 0.0 0.0 06/28/2021 11:42:36 42 323 0.0 5.13 0.0 0.0 06/28/2021 11:42:56 165 320 0.0 5.13 0.0 0.0 06/28/2021 11:43:16 54 321 0.0 5.13 0.0 0.0 06/28/2021 11:43:36 25 323 0.0 5.13 0.0 0.0 06/28/2021 11:43:56 17 308 0.0 5.12 0.0 0.0 06/28/2021 11:44:16 13 309 0.0 5.13 0.0 0.0 06/28/2021 11:44:36 19 306 0.0 5.13 0.0 0.0 06/28/2021 11:44:56 108 319 0.0 5.13 0.0 0.0 06/28/2021 11:45:16 200 324 0.0 5.13 0.0 0.0 06/28/2021 11:45:36 213 323 0.0 5.13 0.0 0.0 06/28/2021 11:45:56 225 323 0.0 5.13 0.0 0.0 06/28/2021 11:46:16 219 320 0.0 5.13 0.0 0.0 06/28/2021 11:46:36 216 322 0.0 8.32 0.0 0.0 06/28/2021 11:46:56 207 323 0.0 8.30 0.0 0.0 06/28/2021 11:47:16 204 314 0.0 8.26 0.0 0.0 06/28/2021 11:47:36 203 311 0.0 8.25 0.0 0.0 06/28/2021 11:47:56 199 308 0.0 8.26 0.0 0.0 06/28/2021 11:48:16 195 313 0.0 8.26 0.0 0.0 06/28/2021 11:48:36 200 314 0.0 8.29 0.0 0.0 06/28/2021 11:48:56 196 253 0.0 8.29 0.0 0.0 06/28/2021 11:49:16 193 119 0.0 8.29 0.0 0.0 06/28/2021 11:49:36 194 86 0.0 8.29 0.0 0.0 06/28/2021 11:49:41 193 79 0.0 8.29 0.0 0.0 BATCH UP SPACER 06/28/2021 11:49:56 188 64 0.0 8.30 0.0 0.0 06/28/2021 11:50:16 190 63 0.0 9.60 0.0 0.0 06/28/2021 11:50:36 185 59 0.0 10.88 0.0 0.0 06/28/2021 11:50:56 186 64 0.0 11.65 0.0 0.0 06/28/2021 11:51:16 186 65 0.0 11.48 0.0 0.0 06/28/2021 11:51:36 185 64 0.0 11.73 0.0 0.0 06/28/2021 11:51:56 182 64 0.0 11.84 0.0 0.0 06/28/2021 11:52:16 181 62 0.0 11.97 0.0 0.0 06/28/2021 11:52:36 178 61 0.0 11.97 0.0 0.0 06/28/2021 11:52:56 181 60 0.0 11.97 0.0 0.0 06/28/2021 11:53:16 176 61 0.0 11.97 0.0 0.0 06/28/2021 11:53:36 81 75 0.0 11.96 0.0 0.0 06/28/2021 11:53:56 89 112 0.0 11.95 0.0 0.0 06/28/2021 11:53:57 96 116 0.0 11.95 0.0 0.0 START PUMPKING MUDPUSH 06/28/2021 11:54:16 111 135 1.5 11.95 0.1 0.1 06/28/2021 11:54:36 109 127 1.5 11.85 0.7 0.7 Page 94 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 11:55:16 214 175 2.9 11.78 2.1 2.1 06/28/2021 11:55:36 215 164 3.0 11.79 3.0 3.0 06/28/2021 11:55:56 232 164 3.0 11.80 4.0 4.0 06/28/2021 11:56:16 233 161 3.0 11.86 5.0 5.0 06/28/2021 11:56:36 228 161 3.0 11.92 6.0 6.0 06/28/2021 11:56:56 221 158 3.0 11.97 7.0 7.0 06/28/2021 11:57:16 216 159 3.0 11.78 8.0 8.0 06/28/2021 11:57:36 227 156 3.0 11.79 9.0 9.0 06/28/2021 11:57:56 311 181 3.7 11.80 10.1 10.1 06/28/2021 11:58:16 343 191 4.0 11.80 11.4 11.4 06/28/2021 11:58:36 347 189 4.0 11.80 12.7 12.7 06/28/2021 11:58:56 350 185 4.0 11.79 14.0 14.0 06/28/2021 11:59:16 348 184 4.0 11.78 15.3 15.3 06/28/2021 11:59:36 344 183 4.0 11.76 16.7 16.7 06/28/2021 11:59:56 261 161 3.4 11.72 17.9 17.9 06/28/2021 12:00:16 266 163 3.5 11.69 19.1 19.1 06/28/2021 12:00:36 266 160 3.5 11.66 20.3 20.3 06/28/2021 12:00:56 267 157 3.5 11.57 21.4 21.4 06/28/2021 12:01:16 268 154 3.5 11.44 22.6 22.6 06/28/2021 12:01:36 270 155 3.5 11.35 23.8 23.8 06/28/2021 12:01:56 231 141 3.2 11.31 24.9 24.9 06/28/2021 12:02:16 229 141 3.2 11.29 26.0 26.0 06/28/2021 12:02:36 225 141 3.2 11.28 27.1 27.1 06/28/2021 12:02:56 232 141 3.2 11.27 28.2 28.2 06/28/2021 12:03:16 225 136 3.3 11.82 29.2 29.2 06/28/2021 12:03:36 230 136 3.2 11.76 30.3 30.3 06/28/2021 12:03:56 232 141 3.2 11.85 31.4 31.4 06/28/2021 12:04:16 230 138 3.2 11.88 32.5 32.5 06/28/2021 12:04:36 307 158 3.8 11.85 33.6 33.6 06/28/2021 12:04:56 329 162 4.0 11.83 34.9 34.9 06/28/2021 12:05:16 671 258 6.1 11.83 36.8 36.8 06/28/2021 12:05:36 690 258 6.1 11.84 38.9 38.9 06/28/2021 12:05:56 674 257 6.1 11.70 40.9 40.9 06/28/2021 12:06:16 670 250 6.1 11.61 42.9 42.9 06/28/2021 12:06:36 693 245 6.0 11.60 45.0 45.0 06/28/2021 12:06:56 681 240 6.1 11.58 47.0 47.0 06/28/2021 12:07:16 452 177 4.9 11.35 48.7 48.7 06/28/2021 12:07:36 458 177 4.9 11.39 50.3 50.3 06/28/2021 12:07:56 465 176 5.0 11.80 52.0 52.0 06/28/2021 12:08:16 471 177 4.9 12.47 53.6 53.6 06/28/2021 12:08:36 480 182 5.0 12.67 55.3 55.3 06/28/2021 12:08:56 30 82 0.0 12.67 55.4 55.4 06/28/2021 12:09:13 28 82 0.0 12.67 55.4 55.4 Reset Total, Vol = 55.44 bbl 06/28/2021 12:09:16 27 81 0.0 12.67 55.4 0.0 06/28/2021 12:09:36 23 83 0.0 12.67 55.4 0.0 06/28/2021 12:09:56 25 84 0.0 12.68 55.4 0.0 06/28/2021 12:10:16 21 84 0.0 12.68 55.4 0.0 06/28/2021 12:10:36 17 82 0.0 12.68 55.4 0.0 06/28/2021 12:10:56 19 82 0.0 9.96 55.4 0.0 06/28/2021 12:11:16 17 84 0.0 9.89 55.4 0.0 06/28/2021 12:11:36 16 82 0.0 9.89 55.4 0.0 06/28/2021 12:11:56 19 82 0.0 9.88 55.4 0.0 06/28/2021 12:12:16 18 81 0.0 9.87 55.4 0.0 06/28/2021 12:12:36 17 81 0.0 8.70 55.4 0.0 Page 95 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 12:12:56 17 82 0.0 9.48 55.4 0.0 06/28/2021 12:13:16 17 83 0.0 10.82 55.4 0.0 06/28/2021 12:13:36 15 80 0.0 11.89 55.4 0.0 06/28/2021 12:13:56 15 84 0.0 12.83 55.4 0.0 06/28/2021 12:14:16 14 83 0.0 13.71 55.4 0.0 06/28/2021 12:14:36 14 86 0.0 14.50 55.4 0.0 06/28/2021 12:14:56 14 83 0.0 15.20 55.4 0.0 06/28/2021 12:15:16 13 84 0.0 15.70 55.4 0.0 06/28/2021 12:15:36 16 82 0.0 15.36 55.4 0.0 06/28/2021 12:15:56 14 82 0.0 15.51 55.4 0.0 06/28/2021 12:16:16 86 91 1.4 15.94 55.5 0.0 06/28/2021 12:16:36 284 104 3.1 16.50 56.2 0.8 06/28/2021 12:16:56 367 113 2.9 16.73 57.2 1.8 06/28/2021 12:17:16 402 169 3.1 16.03 58.2 2.7 06/28/2021 12:17:36 373 180 3.1 15.70 59.2 3.8 06/28/2021 12:17:56 339 156 3.1 15.50 60.2 4.8 06/28/2021 12:18:16 324 148 3.1 15.48 61.3 5.9 06/28/2021 12:18:36 320 143 3.1 15.48 62.3 6.9 06/28/2021 12:18:56 321 142 3.1 15.70 63.4 7.9 06/28/2021 12:19:16 330 141 3.1 15.92 64.4 9.0 06/28/2021 12:19:36 344 136 3.1 15.92 65.5 10.0 06/28/2021 12:19:56 339 138 3.1 15.99 66.5 11.1 06/28/2021 12:20:16 334 138 3.1 15.91 67.5 12.1 06/28/2021 12:20:36 334 139 3.1 15.84 68.6 13.1 06/28/2021 12:20:56 336 140 3.1 15.78 69.6 14.2 06/28/2021 12:21:16 338 137 3.1 15.74 70.7 15.2 06/28/2021 12:21:36 326 131 3.1 15.70 71.7 16.3 06/28/2021 12:21:56 276 123 2.8 15.70 72.7 17.3 06/28/2021 12:22:16 269 119 2.9 15.71 73.6 18.2 06/28/2021 12:22:36 288 121 2.9 15.77 74.6 19.2 06/28/2021 12:22:56 372 139 3.3 15.79 75.7 20.3 06/28/2021 12:23:16 410 147 3.5 15.81 76.8 21.4 06/28/2021 12:23:36 499 169 4.0 15.80 78.1 22.6 06/28/2021 12:23:56 540 178 4.1 15.78 79.4 24.0 06/28/2021 12:24:16 527 177 4.1 15.77 80.8 25.3 06/28/2021 12:24:36 502 167 4.0 15.76 82.1 26.7 06/28/2021 12:24:56 526 171 4.0 15.76 83.5 28.0 06/28/2021 12:25:16 492 157 3.9 15.75 84.7 29.3 06/28/2021 12:25:36 470 158 3.9 15.75 86.0 30.6 06/28/2021 12:25:56 421 151 3.6 15.78 87.3 31.8 06/28/2021 12:26:16 426 149 3.6 15.81 88.5 33.0 06/28/2021 12:26:36 435 150 3.7 15.84 89.7 34.2 06/28/2021 12:26:56 443 148 3.6 15.87 90.9 35.5 06/28/2021 12:27:16 425 148 3.6 15.89 92.1 36.7 06/28/2021 12:27:36 437 151 3.7 15.90 93.3 37.9 06/28/2021 12:27:56 446 151 3.6 15.90 94.5 39.1 06/28/2021 12:28:16 444 152 3.6 15.89 95.7 40.3 06/28/2021 12:28:36 443 162 3.7 15.86 96.9 41.5 06/28/2021 12:28:56 474 161 3.8 15.82 98.2 42.7 06/28/2021 12:29:16 460 155 3.8 15.79 99.4 44.0 06/28/2021 12:29:36 447 161 3.8 15.74 100.7 45.3 06/28/2021 12:29:56 464 160 3.8 15.66 101.9 46.5 06/28/2021 12:30:16 445 155 3.8 15.66 103.2 47.8 06/28/2021 12:30:36 472 160 3.8 15.66 104.5 49.0 Page 96 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 12:31:16 22 82 0.0 15.83 106.6 51.2 06/28/2021 12:31:36 23 86 0.0 15.84 106.6 51.2 06/28/2021 12:31:56 22 84 0.0 15.84 106.6 51.2 06/28/2021 12:32:08 22 82 0.0 15.84 106.6 51.2 Reset Total, Vol = 51.21 bbl 06/28/2021 12:32:16 19 84 0.0 15.84 106.6 0.0 06/28/2021 12:32:30 21 102 0.0 15.84 106.6 0.0 LOADING PLUG 06/28/2021 12:32:36 23 105 0.0 15.84 106.6 0.0 06/28/2021 12:32:56 27 106 0.0 15.84 106.6 0.0 06/28/2021 12:33:16 34 159 0.0 15.84 106.6 0.0 06/28/2021 12:33:36 27 112 0.0 15.84 106.6 0.0 06/28/2021 12:33:56 27 110 0.0 15.85 106.6 0.0 06/28/2021 12:34:16 36 142 0.0 15.85 106.6 0.0 06/28/2021 12:34:36 27 118 0.0 15.85 106.6 0.0 06/28/2021 12:34:56 23 111 0.0 15.85 106.6 0.0 06/28/2021 12:35:16 24 109 0.0 15.85 106.6 0.0 06/28/2021 12:35:36 23 105 0.0 15.85 106.6 0.0 06/28/2021 12:35:56 25 104 0.0 15.85 106.6 0.0 06/28/2021 12:36:16 22 105 0.0 15.85 106.6 0.0 06/28/2021 12:36:36 25 107 0.0 15.85 106.6 0.0 06/28/2021 12:36:56 23 108 0.0 15.85 106.6 0.0 06/28/2021 12:37:16 186 145 1.9 15.86 106.8 0.1 06/28/2021 12:37:34 428 230 4.2 15.86 107.5 0.9 WATER BEHIND 06/28/2021 12:37:36 411 215 4.2 15.86 107.7 1.0 06/28/2021 12:37:56 347 156 4.8 15.85 109.2 2.6 06/28/2021 12:38:16 542 193 6.3 15.86 110.8 4.2 06/28/2021 12:38:36 400 158 5.4 15.86 112.7 6.0 06/28/2021 12:38:56 401 151 5.4 15.86 114.5 7.8 06/28/2021 12:39:16 384 122 5.4 15.86 116.3 9.7 06/28/2021 12:39:36 392 129 5.4 15.86 118.1 11.5 06/28/2021 12:39:56 388 128 5.4 15.86 119.9 13.3 06/28/2021 12:40:16 391 133 5.4 15.86 121.7 15.1 06/28/2021 12:40:36 410 132 5.6 15.86 123.6 16.9 06/28/2021 12:40:56 405 134 5.5 15.86 125.4 18.8 06/28/2021 12:41:16 14 69 0.2 15.86 126.7 20.1 06/28/2021 12:41:36 7 72 0.0 15.86 126.8 20.1 06/28/2021 12:41:56 -2 73 0.0 15.86 126.8 20.1 06/28/2021 12:42:16 -3 126 0.0 15.86 126.8 20.1 06/28/2021 12:42:36 -21 106 0.0 15.86 126.8 20.1 06/28/2021 12:42:56 -19 110 0.0 15.86 126.8 20.1 06/28/2021 12:43:16 -14 109 0.0 15.86 126.8 20.1 06/28/2021 12:43:36 -14 153 0.0 15.87 126.8 20.1 06/28/2021 12:43:56 -14 177 0.0 15.86 126.8 20.1 06/28/2021 12:44:16 -10 175 0.0 15.86 126.8 20.1 06/28/2021 12:44:36 -11 176 0.0 15.87 126.8 20.1 06/28/2021 12:44:56 -9 174 0.0 9.51 126.8 20.1 06/28/2021 12:45:16 -11 177 0.0 9.58 126.8 20.1 06/28/2021 12:45:36 -11 175 0.0 11.18 126.8 20.1 06/28/2021 12:45:56 -13 175 0.0 12.54 126.8 20.1 06/28/2021 12:46:16 -9 175 0.0 13.67 126.8 20.1 06/28/2021 12:46:36 -11 175 0.0 14.41 126.8 20.1 06/28/2021 12:46:56 -11 173 0.0 14.31 126.8 20.1 06/28/2021 12:47:16 -12 177 0.0 14.89 126.8 20.1 06/28/2021 12:47:36 -10 176 0.0 15.52 126.8 20.1 06/28/2021 12:47:56 -10 170 0.0 16.12 126.8 20.1 Page 97 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 12:48:36 -9 171 0.0 15.17 126.8 20.1 06/28/2021 12:48:56 -13 172 0.0 15.12 126.8 20.1 06/28/2021 12:49:16 -11 171 0.0 15.12 126.8 20.1 06/28/2021 12:49:36 -10 171 0.0 15.12 126.8 20.1 06/28/2021 12:49:56 -10 170 0.0 15.14 126.8 20.1 06/28/2021 12:50:16 -9 172 0.0 15.14 126.8 20.1 06/28/2021 12:50:36 -9 170 0.0 15.14 126.8 20.1 06/28/2021 12:50:56 -9 173 0.0 15.14 126.8 20.1 06/28/2021 12:51:16 -11 169 0.0 15.14 126.8 20.1 06/28/2021 12:51:36 -12 169 0.0 15.14 126.8 20.1 06/28/2021 12:51:56 -12 173 0.0 15.09 126.8 20.1 06/28/2021 12:52:16 -9 178 0.0 15.06 126.8 20.1 06/28/2021 12:52:36 -11 170 0.0 15.06 126.8 20.1 06/28/2021 12:52:56 -13 176 0.0 15.06 126.8 20.1 06/28/2021 12:53:16 -11 180 0.0 15.06 126.8 20.1 06/28/2021 12:53:36 -11 178 0.0 15.06 126.8 20.1 06/28/2021 12:53:56 -10 177 0.0 10.24 126.8 20.1 06/28/2021 12:54:16 -9 184 0.0 9.99 126.8 20.1 06/28/2021 12:54:36 -12 177 0.0 10.01 126.8 20.1 06/28/2021 12:54:56 -11 179 0.0 9.99 126.8 20.1 06/28/2021 12:55:16 -12 183 0.0 9.76 126.8 20.1 06/28/2021 12:55:36 -9 178 0.0 9.63 126.8 20.1 06/28/2021 12:55:56 -13 183 0.0 9.54 126.8 20.1 06/28/2021 12:56:16 -9 183 0.0 9.38 126.8 20.1 06/28/2021 12:56:36 -12 178 0.0 9.25 126.8 20.1 06/28/2021 12:56:56 -13 182 0.0 9.12 126.8 20.1 06/28/2021 12:57:16 -12 185 0.0 8.65 126.8 20.1 06/28/2021 12:57:36 -11 180 0.0 8.60 126.8 20.1 06/28/2021 12:57:56 -10 184 0.0 8.62 126.8 20.1 06/28/2021 12:58:16 -12 182 0.0 8.49 126.8 20.1 06/28/2021 12:58:36 -11 184 0.0 8.36 126.8 20.1 06/28/2021 12:58:56 -12 186 0.0 8.39 126.8 20.1 06/28/2021 12:59:16 -13 182 0.0 8.37 126.8 20.1 06/28/2021 12:59:36 -16 186 0.0 8.37 126.8 20.1 06/28/2021 12:59:56 -12 182 0.0 8.37 126.8 20.1 06/28/2021 13:00:16 -10 181 0.0 8.22 126.8 20.1 06/28/2021 13:00:36 -13 181 0.0 8.04 126.8 20.1 06/28/2021 13:00:56 -9 181 0.0 7.87 126.8 20.1 06/28/2021 13:01:16 -11 179 0.0 7.68 126.8 20.1 06/28/2021 13:01:36 -13 183 0.0 7.47 126.8 20.1 06/28/2021 13:01:56 -9 181 0.0 7.26 126.8 20.1 06/28/2021 13:02:16 -10 177 0.0 7.04 126.8 20.1 06/28/2021 13:02:36 -11 180 0.0 6.83 126.8 20.1 06/28/2021 13:02:56 -11 180 0.0 6.64 126.8 20.1 06/28/2021 13:03:16 -9 174 0.0 6.51 126.8 20.1 06/28/2021 13:03:36 -12 180 0.0 6.39 126.8 20.1 06/28/2021 13:03:56 -11 172 0.0 6.29 126.8 20.1 06/28/2021 13:04:16 -9 175 0.0 6.20 126.8 20.1 06/28/2021 13:04:36 -8 178 0.0 6.15 126.8 20.1 06/28/2021 13:04:56 -9 177 0.0 6.10 126.8 20.1 06/28/2021 13:05:16 -12 176 0.0 6.08 126.8 20.1 06/28/2021 13:05:36 -12 178 0.0 6.05 126.8 20.1 06/28/2021 13:05:56 7 174 0.0 6.03 126.8 20.1 06/28/2021 13:06:16 55 178 0.0 6.02 126.8 20.1 Page 98 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 13:06:56 129 174 0.0 6.01 126.8 20.1 06/28/2021 13:07:16 127 179 0.0 6.01 126.8 20.1 06/28/2021 13:07:36 124 178 0.0 6.01 126.8 20.1 06/28/2021 13:07:56 118 176 0.0 6.01 126.8 20.1 06/28/2021 13:08:16 116 179 0.0 6.02 126.8 20.1 06/28/2021 13:08:36 15 182 0.0 6.01 126.8 20.1 06/28/2021 13:08:56 -8 177 0.0 6.01 126.8 20.1 06/28/2021 13:09:16 -9 178 0.0 6.01 126.8 20.1 06/28/2021 13:09:36 -8 177 0.0 5.96 126.8 20.1 06/28/2021 13:09:56 -3 177 0.0 5.93 126.8 20.1 06/28/2021 13:10:16 -6 179 0.0 5.92 126.8 20.1 06/28/2021 13:10:36 -5 175 0.0 5.90 126.8 20.1 06/28/2021 13:10:56 -4 175 0.0 5.89 126.8 20.1 06/28/2021 13:11:16 -2 181 0.0 5.87 126.8 20.1 06/28/2021 13:11:36 45 179 0.0 6.06 126.8 20.1 06/28/2021 13:11:56 115 173 0.0 6.20 126.8 20.1 06/28/2021 13:12:16 129 179 0.0 6.23 126.8 20.1 06/28/2021 13:12:36 131 176 0.0 6.23 126.8 20.1 06/28/2021 13:12:56 128 171 0.0 6.23 126.8 20.1 06/28/2021 13:13:16 128 178 0.0 6.23 126.8 20.1 06/28/2021 13:13:36 128 173 0.0 6.24 126.8 20.1 06/28/2021 13:13:56 127 171 0.0 6.24 126.8 20.1 06/28/2021 13:14:16 126 171 0.0 6.24 126.8 20.1 06/28/2021 13:14:36 126 172 0.0 6.24 126.8 20.1 06/28/2021 13:14:56 126 169 0.0 6.24 126.8 20.1 06/28/2021 13:15:16 127 170 0.0 6.24 126.8 20.1 06/28/2021 13:15:36 13 170 0.0 6.24 126.8 20.1 06/28/2021 13:15:56 5 169 0.0 6.24 126.8 20.1 06/28/2021 13:16:16 -3 170 0.0 6.24 126.8 20.1 06/28/2021 13:16:36 -7 171 0.0 6.24 126.8 20.1 06/28/2021 13:16:56 83 171 0.0 6.24 126.8 20.1 06/28/2021 13:17:16 90 177 0.0 6.24 126.8 20.1 06/28/2021 13:17:36 146 169 0.0 6.24 126.8 20.1 06/28/2021 13:17:56 147 173 0.0 6.24 126.8 20.1 06/28/2021 13:18:16 146 181 0.0 6.25 126.8 20.1 06/28/2021 13:18:36 147 174 0.0 6.26 126.8 20.1 06/28/2021 13:18:56 147 180 0.0 6.26 126.8 20.1 06/28/2021 13:19:16 148 185 0.0 6.26 126.8 20.1 06/28/2021 13:19:36 148 177 0.0 6.26 126.8 20.1 06/28/2021 13:19:56 148 181 0.0 6.26 126.8 20.1 06/28/2021 13:20:16 150 187 0.0 6.26 126.8 20.1 06/28/2021 13:20:36 145 179 0.0 6.27 126.8 20.1 06/28/2021 13:20:56 4 184 0.0 6.27 126.8 20.1 06/28/2021 13:21:16 2 191 0.0 6.27 126.8 20.1 06/28/2021 13:21:36 -3 183 0.0 6.26 126.8 20.1 06/28/2021 13:21:56 0 190 0.0 6.26 126.8 20.1 06/28/2021 13:22:16 5 196 0.0 6.27 126.8 20.1 06/28/2021 13:22:36 130 197 0.0 6.27 126.8 20.1 06/28/2021 13:22:56 146 214 0.0 6.27 126.8 20.1 06/28/2021 13:23:16 150 225 0.0 6.28 126.8 20.1 06/28/2021 13:23:36 149 230 0.0 6.28 126.8 20.1 06/28/2021 13:23:56 -1 231 0.0 6.28 126.8 20.1 06/28/2021 13:24:16 -4 243 0.0 6.27 126.8 20.1 06/28/2021 13:24:36 -6 246 0.0 6.28 126.8 20.1 Page 99 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 13:25:16 -1 264 0.0 6.27 126.8 20.1 06/28/2021 13:25:36 -3 271 0.0 6.27 126.8 20.1 06/28/2021 13:25:56 113 277 0.0 6.27 126.8 20.1 06/28/2021 13:26:16 143 276 0.0 6.27 126.8 20.1 06/28/2021 13:26:36 13 278 0.0 6.28 126.8 20.1 06/28/2021 13:26:56 85 279 0.0 6.27 126.8 20.1 06/28/2021 13:27:16 118 283 0.0 6.27 126.8 20.1 06/28/2021 13:27:36 118 284 0.0 6.28 126.8 20.1 06/28/2021 13:27:56 1 290 0.0 6.27 126.8 20.1 06/28/2021 13:28:16 -1 289 0.0 6.28 126.8 20.1 06/28/2021 13:28:36 -4 290 0.0 6.27 126.8 20.1 06/28/2021 13:28:56 -7 300 0.0 6.28 126.8 20.1 06/28/2021 13:29:16 -6 296 0.0 6.28 126.8 20.1 06/28/2021 13:29:36 -10 299 0.0 6.27 126.8 20.1 06/28/2021 13:29:56 -9 308 0.0 6.27 126.8 20.1 06/28/2021 13:30:16 -7 311 0.0 6.27 126.8 20.1 06/28/2021 13:30:36 -8 308 0.0 6.27 126.8 20.1 06/28/2021 13:30:56 -9 314 0.0 6.27 126.8 20.1 06/28/2021 13:31:16 -10 313 0.0 6.27 126.8 20.1 06/28/2021 13:31:36 -11 318 0.0 6.27 126.8 20.1 06/28/2021 13:31:56 -12 323 0.0 4.15 126.8 20.1 06/28/2021 13:32:16 -12 326 0.0 4.08 126.8 20.1 06/28/2021 13:32:36 -11 329 0.0 4.02 126.8 20.1 06/28/2021 13:32:56 -9 332 0.0 3.98 126.8 20.1 06/28/2021 13:33:16 -10 336 0.0 3.95 126.8 20.1 06/28/2021 13:33:36 -9 339 0.0 3.91 126.8 20.1 06/28/2021 13:33:56 -10 343 0.0 3.89 126.8 20.1 06/28/2021 13:34:16 -10 346 0.0 3.86 126.8 20.1 06/28/2021 13:34:36 -12 354 0.0 3.84 126.8 20.1 06/28/2021 13:34:56 -9 364 0.0 0.00 126.8 20.1 06/28/2021 13:35:16 -13 366 0.0 -0.00 126.8 20.1 06/28/2021 13:35:36 -8 374 0.0 0.00 126.8 20.1 06/28/2021 13:35:56 -7 379 0.0 0.00 126.8 20.1 06/28/2021 13:36:16 -10 380 0.0 -0.00 126.8 20.1 06/28/2021 13:36:36 -11 390 0.0 -0.00 126.8 20.1 06/28/2021 13:36:56 -9 395 0.0 0.00 126.8 20.1 06/28/2021 13:37:16 -11 391 0.0 -0.00 126.8 20.1 06/28/2021 13:37:36 -10 399 0.0 0.00 126.8 20.1 06/28/2021 13:37:56 -13 400 0.0 0.00 126.8 20.1 06/28/2021 13:38:16 -12 407 0.0 0.00 126.8 20.1 06/28/2021 13:38:36 -12 416 0.0 -0.00 126.8 20.1 06/28/2021 13:38:56 -7 414 0.0 -0.00 126.8 20.1 06/28/2021 13:39:16 -8 423 0.0 -0.00 126.8 20.1 06/28/2021 13:39:36 -9 425 0.0 -0.00 126.8 20.1 06/28/2021 13:39:56 -10 426 0.0 -0.00 126.8 20.1 06/28/2021 13:40:16 -8 443 0.0 0.00 126.8 20.1 06/28/2021 13:40:36 -10 450 0.0 -0.00 126.8 20.1 06/28/2021 13:40:56 -8 447 0.0 -0.00 126.8 20.1 06/28/2021 13:41:16 -6 452 0.0 0.00 126.8 20.1 06/28/2021 13:41:36 -10 461 0.0 -0.00 126.8 20.1 06/28/2021 13:41:56 -11 459 0.0 -0.00 126.8 20.1 06/28/2021 13:42:16 -11 458 0.0 0.00 126.8 20.1 06/28/2021 13:42:36 -8 470 0.0 -0.00 126.8 20.1 06/28/2021 13:42:56 -7 467 0.0 -0.00 126.8 20.1 Page 100 of 101 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Date Time 24-hr clock PUMP PRESS PSI FLOOR PRESS PSI CMT_RATE B/M CMT_DENS LB/G CMT_VOL BBL CMT_STG_VOL BBL Message 06/28/2021 13:43:36 -9 477 0.0 0.00 126.8 20.1 06/28/2021 13:43:56 -9 473 0.0 -0.00 126.8 20.1 06/28/2021 13:44:16 -11 474 0.0 -0.00 126.8 20.1 06/28/2021 13:44:36 -9 488 0.0 -0.00 126.8 20.1 06/28/2021 13:44:56 -11 485 0.0 -0.00 126.8 20.1 06/28/2021 13:45:16 -11 467 0.0 -0.00 126.8 20.1 06/28/2021 13:45:36 -12 315 0.0 -0.00 126.8 20.1 06/28/2021 13:45:56 -9 330 0.0 -0.00 126.8 20.1 06/28/2021 13:46:16 -10 821 0.0 -0.00 126.8 20.1 06/28/2021 13:46:36 -10 1249 0.0 -0.00 126.8 20.1 06/28/2021 13:46:56 -10 1663 0.0 -0.01 126.8 20.1 06/28/2021 13:47:16 -11 1667 0.0 -0.00 126.8 20.1 06/28/2021 13:47:36 -9 1812 0.0 -0.00 126.8 20.1 06/28/2021 13:47:56 -13 1845 0.0 -0.00 126.8 20.1 06/28/2021 13:48:16 -12 1841 0.0 -0.00 126.8 20.1 06/28/2021 13:48:36 -14 1837 0.0 -0.00 126.8 20.1 06/28/2021 13:48:56 -12 1833 0.0 0.00 126.8 20.1 06/28/2021 13:49:16 -11 1835 0.0 -0.00 126.8 20.1 06/28/2021 13:49:36 -13 1832 0.0 0.00 126.8 20.1 06/28/2021 13:49:56 -12 1831 0.0 -0.00 126.8 20.1 06/28/2021 13:50:08 -11 1831 0.0 0.00 126.8 20.1 BUMPED PLUG 3196 STROKES 06/28/2021 13:50:16 -11 1831 0.0 0.00 126.8 20.1 06/28/2021 13:50:36 -12 1828 0.0 0.00 126.8 20.1 06/28/2021 13:50:56 -11 1831 0.0 -0.00 126.8 20.1 06/28/2021 13:51:16 -12 1830 0.0 0.00 126.8 20.1 06/28/2021 13:51:36 -12 1828 0.0 -0.00 126.8 20.1 06/28/2021 13:51:56 -14 1827 0.0 -0.00 126.8 20.1 06/28/2021 13:52:16 -12 1827 0.0 -0.00 126.8 20.1 06/28/2021 13:52:36 -12 1829 0.0 0.00 126.8 20.1 06/28/2021 13:52:56 -13 1829 0.0 0.00 126.8 20.1 Post Job Summary Volume of Fluid Injected, bbl N2 Maximum Rate 7.1 Average Pump Rates, bbl/min Slurry 2.9 Mud Total Slurry 112.2 Mud 0.0 Spacer 115.0 N2 Treating Pressure Summary, psi Breakdown Fluid Maximum 3952 Final -12 Average 101 Bump Plug to 1500 Breakdown Type Volume bbl Density lb/gal Avg. N2 Percent % Designed Slurry Volume 112.0 bbl Displacement 20.0 bbl Mix Water Temp 80 degF Cement Circulated to Surface?Volume bbl Washed Thru Perfs To ft Customer or Authorized Representative Rob Reinhardt Schlumberger Supervisor Jmorrison@slb.com Circulation Lost Job Completed X -- Page 101 of 101 Post Job Summary Volume of Fluid Injected, bbl N2 Maximum Rate 7.1 Average Pump Rates, bbl/min Slurry 2.9 Mud Total Slurry 112.2 Mud 0.0 Spacer 115.0 N2 Treating Pressure Summary, psi Breakdown Fluid Maximum 3952 Final -12 Average 101 Bump Plug to 1500 Breakdown Type Volume bbl Density lb/gal Avg. N2 Percent % Designed Slurry Volume 112.0 bbl Displacement 20.0 bbl Mix Water Temp 80 degF Cement Circulated to Surface?Volume bbl Washed Thru Perfs To ft Customer or Authorized Representative Rob Reinhardt Schlumberger Supervisor Jmorrison@slb.com Circulation Lost Job Completed X -- Well MT7-03 Field Mooses Tooth Job Start Jun/27/2021 Customer CPAI Job Number A.1012355.01.27 Service Quality Evaluation Client:CPAI Field:Mooses Tooth Rig:DOYON 25 Well:MT7-03 Service Line:Cementing Job Type:Intermediate Service Order #: Date:Jun/27/2021 Operating Time (hh:mm): 00:00 Client Rep:Rob Reinhardt Schlumberger Engineer:Jmorrison@slb.com Schlumberger FSM: Main Objective: To be completed by Company Rep. Please answer Y (Yes) or N (No) and add any comments below. Comments: (Please include a brief explanation for a "NO" response and summarize any innovations attempted on this well.) Client:Schlumberger: Client Signature:Schlumberger Signature: 1 1a 1b 1c 2 2a 2b 2c 2d 3 3a 3b 3c 3d 3e 3f 3g 3h 3i 3j 4 4a Score Yes / No Result HSE Free of lost time injury and compliance with SLB and loc. spec. HSE practice Free of environmental spill or non-compliant discharge Wellsite left clean 5 5 4 yes yes yes no X no X no X 0 0 0 Sub-total 0% Design / Preparation Program incl. job simulation (CemCADE) & pump schedule / tool hydraulic calcs Equipment maintenance schedule completed / Green tagged All materials and equipment required for job/contingency checked & on location Safety / pre-job meeting conducted with all involved present 3 2 2 2 yes yes yes yes no X no X no X no X 0 0 0 0 Sub-total 0% Execution Lost time < 30 mins Equipment pressure tested succesfully All key parameters monitored and recorded accurately (Pressure, Rate, Density) Plugs / darts released and tested succesfully Density variation met expectations Personnel performed as per expectations Equipment performed as per expectations Job pumped as per design Did job start on time Free of Operational failures (screen out, Cementing Example, etc.) 3 3 2 2 2 2 2 3 2 3 yes yes yes yes yes yes yes yes yes yes no X no X no X no X no X no X no X no X no X no X 0 0 0 0 0 0 0 0 0 0 Sub-total 0% Evaluation Main job objective achieved with no consequential non-productive time 10 yes no X 0 Sub-total 0% Total 0% Service Quality Evaluation From:Gorham, Brad To:Loepp, Victoria T (OGC) Cc:WSC Operations Engineer Subject:(PTD#221-024) MT7-03 Surface Casing FIT Date:Tuesday, June 15, 2021 9:45:07 AM Attachments:MT7-03 Surface csg test FIT or LOT Pressure Integrity Test Form.pdf Victoria, Please see attached for the surface casing FIT from MT7-03. Let us know if you’d like to see any other information or have any additional questions. Thanks, Brad Gorham Drilling Engineer - WNS W: (907) 265-6487 C: (907) 351-5082 Brad.Gorham@cop.com Well Name: Rig: Date: Drilling Supervisor:Pump used:2 Strokes Barrels 2 3 4 Casing Test Pressure Integrity Test Hole Size:4 12.25 RKB-CHF:39.7 Ft 3523.0 Ft-MD 3062.0 Ft-TVD 3553.0 Ft-MD 3081.0 Ft-TVD Strks psi Min psi Strks psi Min psi 12.42 2 2 132 0 3640 2 98 0.00 1421 4 256 1 3640 4 142 0.25 1355 Mud Weight: 10.6 ppg Mud Weight:9.6 ppg 6 385 2 3639 6 190 0.50 1299 Mud 10 min Gel: 18.0 Lb/100 Ft2 Mud 10 min Gel:14.0 Lb/100 Ft2 8 508 3 3637 8 258 1.00 1262 Test Pressure: 3500.0 psi Rotating Weight:#######Lbs 10 630 4 3635 10 326 1.50 1231 Rotating Weight: ######Lbs Blocks/Top Drive Weight:43000.0 Lbs 12 755 5 3634 12 400 2.00 1202 Blocks/Top Drive Weight: 43000.0 Lbs Desired PIT EMW:18.5 ppg 14 870 6 3632 14 471 2.50 1177 Estimates for Test:6.3 bbls Estimates for Test:1417 psi 2.6 bbls 16 1000 7 3630 16 547 3.00 1153 1 1 18 1090 8 3629 18 622 3.50 1130 EMW = Leak-off Pressure + Mud Weight =20 1200 9 3628 20 700 4.00 1111 0.052 x TVD 0.052 x 3062 22 1320 10 3627 22 780 4.50 1093 18.0 ppg 24 1444 15 3622 24 844 5.00 1082 26 1540 20 3617 26 910 5.50 1070 28 1670 25 3612 28 975 6.00 1062 30 1790 30 3608 30 1034 6.50 1053 32 1905 32 1095 7.00 1045 34 2025 34 1140 7.50 1039 36 2180 36 1194 8.00 1033 38 2290 38 1248 8.50 1029 40 2410 40 1300 9.00 1024 42 2555 42 1337 9.50 1020 44 2690 44 1364 10.00 1017 46 2825 46 1391 48 2950 48 1407 50 3070 50 1421 52 3210 54 3350 56 3480 58 3640 6.9 Bbls 6.0 Bbls 5.9 Bbls 3.0 Bbls Comments: CONOCOPHILLIPS Alaska, Inc. Pumping down EMW at 3523 Ft-MD (3062 Ft-TVD) =1355 9.61337+PIT 15 Second Shut-in Pressure, psi Volume Pumped Volume Bled Back Volume Input PRESSURE INTEGRITY TEST Type of Test: Casing Test Pressure IntegrityTest Hole DepthCasing Shoe Depth Casing Size and Description: Pump Rate: 6/12/2021 K. Harding / B. Book Volume/Stroke 6.00 Pumping 0.1183 MT7-03 Doyon 25 Volume Bled Back Shut-in Pumping Shut-in Volume Pumped 0 500 1000 1500 2000 2500 3000 3500 4000 0 1 2 3 4 5 6 7 8PRESSURE CASING TEST LEAK-OFF TEST PIT Point Barrels 0 5 10 15 20 25 30 Shut-In time, Minutes Lost 32 psi during test, held 99.1% of test pressure. MT7-03 Surface csg test FIT or LOT Pressure Integrity Test Form.xlsx Summary Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Chris Brillon Drilling Manager ConocoPhillips Alaska, Inc PO Box 100360 Anchorage, AK 99510-0360 Re: Greater Mooses Tooth, Alpine Undefined Pool, GMTU MT7-03 ConocoPhillips Alaska, Inc Permit to Drill Number: 221-024 Surface Location: 996’ FSL, 1912’ FWL, Section 32, T10N, R2E, UM Bottomhole Location: 2718’ FSL, 2111’ FWL, Section 25, T10N, R1E, UM Dear Mr. Brillon: Enclosed is the approved application for the permit to drill the above referenced well. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by ConocoPhillips in the attached application, the following well logs are also required for this well: In addition to the sonic cement evaluation logs mentioned in ConocoPhillips’ planned operations program, the logging program proposed in ConocoPhillips’ (B. Gorham) email to AOGCC (S. Davies) dated 4/27/2021 must be conducted. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension, or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jeremy M. Price Chair DATED this ___ day of May, 2021. Sincerely, JMPi 4 1a. Type of Work:1b. Proposed Well Class: Exploratory - Gas Service - WAG Service - Disp 1c. Specify if well is proposed for: Drill Lateral Stratigraphic Test Development - Oil Service - Winj Single Zone Coalbed Gas Gas Hydrates Redrill Reentry Exploratory - Oil Development - Gas Service - Supply Multiple Zone Geothermal Shale Gas 2. Operator Name:5. Bond: Blanket Single Well 11. Well Name and Number: Bond No. 3. Address:6. Proposed Depth: 12. Field/Pool(s): MD: 24695 TVD: 8247 4a. Location of Well (Governmental Section):7. Property Designation: Surface: Top of Productive Horizon:8. DNR Approval Number: 13. Approximate Spud Date: 1759' FSL,2914' FWL,NWSE S6 T9N R2E 5/28/2021 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 2718' FSL, 2111' FWL, SENW S25 T10N R1E 7108' to AA081784 4b. Location of Well (State Base Plane Coordinates - NAD 27):10. KB Elevation above MSL (ft): 100.4 15. Distance to Nearest Well Open Surface: x-1430146 y- 5915433 Zone- 4 39.5 to Same Pool:723' to Rendezvous 2 16. Deviated wells:Kickoff depth: 650 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: Surface: Hole Casing Weight Grade Coupling Length MD TVD MD TVD 42"20" 94 H-40 Welded 80.5 40 40 120 120 16"13.375" 68.00 L-80 Hyd563 3517 40 40 3556 3088 11"7.625" 29.70 L80 Hyd563 12222 40 40 12261 8400 6.5"4.5" 12.60 L-80 Hyd563 12584 12111 8400 24695 8247 19.PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Junk (measured): TVD Hydraulic Fracture planned?Yes No 20. Attachments:Property Plat BOP Sketch Drilling Program Time v. Depth Plot Shallow Hazard Analysis Diverter Sketch Seabed Report Drilling Fluid Program 20 AAC 25.050 requirements Contact Name: Brad Gorham Chris Brillon Contact Email:Brad.Gorham@cop.com Drilling Manager Contact Phone:907-265-6487 Date: Permit to Drill API Number: Permit Approval Number:Date: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Samples req'd: Yes No Mud log req'd: Yes No H2S measures: Yes No Directional svy req'd: Yes No Spacing exception req'd: Yes No Inclination-only svy req'd: Yes No Post initial injection MIT req'd: Yes No APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng Authorized Title: Authorized Signature: Commission Use Only See cover letter for other requirements. Perforation Depth MD (ft):Perforation Depth TVD (ft): 21. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Production Liner Surface Intermediate Casing Length Size Cement Volume MD Conductor/Structural Total Depth MD (ft):Total Depth TVD (ft):Plugs (measured):Effect. Depth MD (ft):Effect. Depth TVD (ft): (including stage data) 10 yds 2360sx 11 ppg, 310sx 15.8 ppg 570sx 15.8 ppg Class G Tubing with prod packer and perf joints 932535000, 932516000, 932538000 3776, 5720, 5756 GL / BF Elevation above MSL (ft): 3645 1831 18. Casing Program:Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks P.O. Box 100360 Anchorage, Alaska, 99510-0360 Greater Mooses Tooth Rendezvous 996' FSL, 1912' FWL, SESW S32 T10N R2E AA081800, AA081781, AA081803 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 ConocoPhillips 59-52-180 MT7-03 s N ype of W L l R L 1b S Class: o N s Noo N o D s s s D o well is G S S 20 S S S s No No S G y E S s No s 0 0 Form 10-401 Revised 3/2021 This permit is valid for 24 months from the date of approval per 20 AAC 25.005(g)  By Samantha Carlisle at 3:04 pm, Apr 22, 2021 See letter of approval for well logging requirements. NAD 27) 289,989.9 Injection may not begin until an Area Injection Order is approved by AOGCC. X VTL 5/4/21 See attached Conditions of Approval for the intermediate cement job and sonic logging. Surface casing LOT results to AOGCC as soon as obtained VTL 5/4/21 SFD 4/28/2021 Alpine Undefined Oil Pool DSR-4/22/21 VTL 5/4/21 2992 BOP test pressure to 3500 psig Annular preventer test to 2500 psig SFD 4/28/2021 50-103-20830-00-00 5,915,817.8 221-024 DSR-4/22/21 3950 Comm. g LOT results to AOGCC 5/4/21 dts 5/4/2021 JLC 5/4/2021 5/4/2021 GMT MT7-03(PTD 221-024) Conditions of Approval: Approval is granted to run the LWD-Sonic on upcoming well GMT MT7-03 with the following provisions: 1. CPAI will provide a written log evaluation/interpretation to the AOGCC along with the log as soon as they become available. The evaluation is to include/highlight the intervals of competent cement (and lengths) that CPAI is using to meet the objective requirements for annular isolation, reservoir isolation, or confining zone isolation etc. Providing the log without an evaluation/interpretation is not acceptable. 2. LWD sonic logs must show free pipe and Top of Cement, just as the e-line log does. CPAI must start the log at a depth to ensure the free pipe above the TOC is captured as well as the TOC. Starting the log below the actual TOC based on calculations predicting a different TOC will not be acceptable. 3. CPAI will provide a cement job summary report and evaluation along with the cement log and evaluation to the AOGCC when they become available 4. CPAI will provide the results of the FIT when available. 5. Depending on the cement job results indicated by the cement job report, the logs and the FIT, remedial measures or additional logging may be required. ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 April 21, 2021 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill MT7-03 Dear Sir or Madam: ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore Alpine C-Sand Injector well from the MT7 drilling pad. The intended spud date for this well is 5/28/2021. It is intended that Doyon 25 be used to drill the well. MT7-03 will utilize a 16” surface hole will TD above the K3 sand and then 13.375” casing will be set and cemented to surface. The 11” intermediate hole will be drilled into the top of the Alpine C and landed at an inclination of ~ 85°. A 7.625” casing string will be set and cemented from TD to secure the shoe and cover 500’MD or 250’TVD above any hydrocarbon-bearing zones. The production interval will be comprised of a 6.5” horizontal hole that will be geo-steered in the Alpine C sand. The well will be completed as an unstimulated Injector with 4.5” tubing string with production packer with pre-perforated pup joints below and tied back to surface Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a) 2. A proposed drilling program 3. A proposed completion diagram 4. A drilling fluids program summary 5. Proposed diverter configuration 6. Pressure information as required by 20 ACC 25.035 (d)(2) 7. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact Brad Gorham at 265-6487 (Brad.Gorham@conocophillips.com) or Chris Brillon at 265-6589. Sincerely, cc: MT7-03 Well File / Jenna Taylor ATO 540 Dave Lee ATO 1726 Brad Gorham Chris Brillon ATO 528 Drilling Engineer Garret Timmerman ATO 1744 n onshore Alpine C-Sand Injector well from the MT7 drilling pad. T MT7-03 will utilize a 16” surface hole will TD above the K3 sand and then 13.375” casing will be set and cemented to surface. g The 11”intermediate hole will be drilled into the top of the Alpine C and landed at an inclination of ~ 85°. A 7.625” casingppg string will be set and cemented from TD to secure the shoe and cover 500’MD or 250’TVD above any hydrocarbon-bearing g zones. The production interval will be comprised of a 6.5” horizontal hole that will be geo-steered in the Alpine C sand. The well willppgp be completed as an unstimulated Injector with 4.5” tubing string with production packer with pre-perforated pup joints belowp and tied back to surface Application for Permit to Drill, MT7-03 Saved: 22-Apr-21 MT7-03 APD Page 1 of 11 Printed: 22-Apr-21 MT7-03 Application for Permit to Drill Document Table of Contents 1. Well Name (Requirements of 20 AAC 25.005 (f)) ............................................................ 2 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) ............................................ 2 3. Proposed Drilling Program ...................................................................................... 3 4. Diverter and Blowout Prevention Equipment (Requirements of 20 AAC 25.005(c)(7)) ................................................................................................................................... 4 5. MASP Calculations ................................................................................................... 4 6. Procedure for Conducting Formation Integrity Tests (Requirements of 20 AAC 25.005 ©(5)) ............................................................................................................... 5 7. Casing and Cementing Program ............................................................................. 5 8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) .................................... 6 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9)) ................................................................................................................................... 7 10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) .......................................... 7 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005 (c)(11)) ......................... 7 12. Evidence of Bonding (Requirements of 20 AAC 25.005 (c)(12)) ................................... 7 13. Discussion of Mud and Cuttings Disposal and Annular Disposal ....................... 7 (Requirements of 20 AAC 25.005 (c)(14)) ............................................................................. 7 14. Drilling Hazards Summary ....................................................................................... 9 15. Proposed Completion Schematic ......................................................................... 11 Application for Permit to Drill, MT7-03 Saved: 22-Apr-21 MT7-03 APD Page 2 of 11 Printed: 22-Apr-21 1. Well Name (Requirements of 20 AAC 25.005 (f)) The well for which this application is submitted will be designated as MT7-03 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) Location at Surface 996' FSL, 1912' FWL, SESW S32 T10N R2E, UM NAD 1927 Northings: 1430146 Eastings: 5915433 RKB Elevation 39.5’ AMSL Pad Elevation 100.4’ AMSL Top of Productive Horizon (Heel) 1759' FSL, 2914' FWL , NWSE S6 T9N R2E, UM NAD 1927 Northings: 1425877 Eastings: 5911033 Measured Depth, RKB: 12261’ Total Vertical Depth, RKB: 8400’ Total Vertical Depth, SS: 8260’ Total Depth (Toe) 2718' FSL, 2111' FWL, SENW S25 T10N R1E, UM NAD 1927 Northings: 1420127 Eastings: 5922721 Measured Depth, RKB: 24695’ Total Vertical Depth, RKB: 8247’ Total Vertical Depth, SS: 8107’ Pad Layout 1983 SFD 4/28/2021 289,989.9 5,915,817.8 1983 1983 NAD 1927 Equivalent Application for Permit to Drill, MT7-03 Saved: 22-Apr-21 MT7-03 APD Page 3 of 11 Printed: 22-Apr-21 Well Stick Diagram 3. Proposed Drilling Program The proposed drilling program is listed below. Please refer to Attachment 3: Completion Schematic. 1. MIRU Doyon 25 onto MT7-03 2. Rig up and test riser, dewater cellar as needed. 3. Drill 16” hole to the surface casing point as per the directional plan. 4. Run and cement 13.375” surface casing to surface. 5. Install BOPE and MPD equipment. 6. Test BOPE to 250 psi low / 3500 psi high (24-48 hr regulatory notice). 7. Pick up and run in hole with 9-7/8 x 11” drilling BHA to drill the intermediate hole section. 8. Chart casing pressure test to 3500 psi for 30 minutes. 9. Drill out 13.375” shoe track and 20’ of new hole and perform LOT. Maximum LOT to 18.5 ppg. Minimum LOT required to drill ahead is 12.5 ppg EMW. 10. Drill 9-7/8 x 11” hole to section TD, using Managed Pressure Drilling to maintain near constant bottom hole pressure on connections in shale formation. 11. Change out upper pipe rams to 7.625” solid bodies and test same to 3,500 psi. 12. Run 7.625” casing and cement to 250’ TVD above the hydrocarbon bearing zones (cementing schematic attached). 13. Change upper pipe rams to 2-7/8” x 5-1/2” VBRs. VTL 5/4/21 LOT required to drill ahead is 12.5 ppg EMW. VTL 5/4/21 d cement 13.375” surface casing to surface. VTL 5/4/21 Submit LOT results to AOGCC as soon as available. Refer to AOGCC Industry Guidance Bulletin 13-01:Remedial Cementing for Surface Casing if top job is required. . Submit results of intermediate cementing job to AOGCC AS SOON AS AVAILABLE Application for Permit to Drill, MT7-03 Saved: 22-Apr-21 MT7-03 APD Page 4 of 11 Printed: 22-Apr-21 14. Test BOPE to 250 psi low / 3,500 psi high (24-48 Regulatory notice). 15. Pick up and run in hole with 6.5” drilling BHA. Log top of cement with sonic tool in recorded mode. 16. Chart casing pressure test to 3500 psi for 30 minutes. 17. Drill out shoe track and 20 feet of new formation. Perform LOT to a maximum of 16.0 ppg. Minimum required leak-off value is 11.0 ppg EMW. 18. Drill 6.5” hole to section TD. 19. Pull out of hole with drilling BHA. Review cement job details and sonic log TOC. 20. Run 4.5” tubing/liner combo with shoe, pre-perforated joints, production packer, landing nipple, BHI Hydrotrip ball seat, gas lift mandrel(s), and downhole gauge. Displace mud in production casing to kill weight brine, space out and land tubing hanger with pre-installed and pre-tested BPV. 21. Pressure test seals to 5,000 psi. Nipple down BOP 22. Install tubing head adapter assembly. Pressure test adapter assembly to 5,000 psi. Remove BPV. 23. Freeze Protect by bullheading down IA. 24. Drop BHI Hydrotrip ball and pump down tubing until ball seats. 25. Pressure up to 3,500 psi to set production packer. Test tubing to 3,500 psi / 30 minutes and chart test. Test casing annulus separately to 3,500 psi / 30 minutes and chart test. 26. Increase pressure to shift BHI Hydrotrip allowing ball to fall down tubing to shoe to dissolve. 27. Bullhead freeze protect down tubing. 28. Secure well. Rig down and move out. 4. Diverter and Blowout Prevention Equipment (Requirements of 20 AAC 25.005(c)(7)) Please reference BOP and diverter schematics on file for Doyon 25 5. MASP Calculations The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size (in) Csg Setting Depth MD/TVD(ft) Fracture Gradient (ppg) Pore pressure (psi) ASP Drilling (psi) 20 120 / 120 10.9 51 54 13.375 3556/ 47 14.5 964 2020 7.625 12261/ 8400 12.5 3,950 2992 4.5 24695/ 8247 12.5 3,950 n/a PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1]*D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb/gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR SFD 4/28/2021 VTL 5/4/21 3950/8247*1/.052=9.2 ppg EMW VTL 5/4/21 d sonic log TOC.Results of sonic log to be submitted to AOGCC for review and approval before drilling ahead. Log top of cement w The complete logging program for MT7-03 is presented in CPAI's email from B. Gorham to AOGCC (S. Davies) dated 4/27/2021. Application for Permit to Drill, MT7-03 Saved: 22-Apr-21 MT7-03 APD Page 5 of 11 Printed: 22-Apr-21 2) ASP = FPP – (0.1 x D) Where: FPP = Formation Pore Pressure at the next casing point FPP = 0.4525 x TVD 1. ASP CALCULATIONS 1. Drilling below 20” conductor ASP = [(FG x 0.052) – 0.1] D = [(10.9 x 0.052) – 0.1] x 120 = 54 psi OR ASP = FPP – (0.1 x D) = 964 – (0.1 x 3088) = 1072 psi 2. Drilling below 13.375” surface casing ASP = [(FG x 0.052) – 0.1] D = [(14.5 x 0.052) – 0.1] x 47 = 2020 psi OR ASP = FPP – (0.1 x D) = 3950 – (0.1 x 8400) = 2917 psi 3. Drilling below 7.625” intermediate casing ASP = [(FG x 0.052) – 0.1] D = [(12.5 x 0.052) – 0.1] x 8400 = 4620 psi OR ASP = FPP – (0.1 x D) = 3950– (0.1 x 8247) = 2992 psi (B) data on potential gas zones; The well bore is not expected to penetrate any gas zones. (C) data concerning potential causes of hole problems such as abnormally geo-pressured strata, lost circulation zones, and zones that have a propensity for differential sticking; Please see Drilling Hazards Summary 6. Procedure for Conducting Formation Integrity Tests (Requirements of 20 AAC 25.005 ©(5)) Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT/FIT procedure that ConocoPhillips Alaska has on file with the Commission. 7. Casing and Cementing Program Casing and Cementing Program Csg/Tbg OD (in) Hole Size (in) Weight (lb/ft) Grade Conn. Cement Program 20 42 94 H-40 Welded Cemented to surface with 10 yds slurry 13.375 16 68 L-80 Hyd563 Cement to Surface 7.625 9-7/8 x 11 29.7 L80 Hyd563 250’ TVD or 500’ MD, whichever is greater, above upper most producing zone 4.5 6.5 12.6 L-80 Hyd563 Uncemented open hole liner = 2992 psi Application for Permit to Drill, MT7-03 Saved: 22-Apr-21 MT7-03 APD Page 6 of 11 Printed: 22-Apr-21 Cementing Calculations 13.375” Surface Casing run to 3556’ MD / 3088’ TVD Cement from 3556’ MD to 3056' (500’ of tail) with DeepCRETE + Add's. @ 11 PPG, and from 3056' to surface with 11 ppg DeepCrete. Assume 250% excess annular volume in permafrost and 50% excess below the permafrost (1325’ MD), zero excess in 20” conductor. Lead slurry from 3056’ MD to surface with Arctic Lite Crete @ 11 ppg Total Volume = 4498 ft3 => 2360 sx of 11ppg DeepCRETE + Add's @ 1.91 ft3 /sk Tail slurry from 3556’ MD to 3056’ MD with 15.8 ppg DeepCRETE + Add's Total Volume = 349 ft3 => 310.0 sx of 15.8 ppg Class G + Add's @ 1.16 ft3/sk 7.625” Intermediate Casing run to 12261’ MD / 8400’ TVD Top of slurry is designed to be at 10950’ MD, which is 500’MD or 250’ TVD above the prognosis shallowest hydrocarbon bearing zone Alpine C. If a shallower hydrocarbon zone of producible volumes, is encountered while drilling, a 2 stage cement job will be performed to isolate this zone. Assume 40% excess annular volume. Tail slurry from 12261’ MD to 10950’ MD with 15.8 ppg Class G + Add's Total Volume = 7508ft3 => 570 sx of 15.8 ppg Class G + Add's@ 1.16 ft3/sk 8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) Surface Intermediate Production Hole Size in. 16 9-7/8 x 11 6.5 Casing Size in. 13.375 7.625 4.5 Density PPG 9.5 – 10.7 9.6 – 11.2 8.8 – 9.5 PV cP 30 - 80 10 10 YP lb./100 ft2 100 - 200 20 - 28 10 - 15 Funnel Viscosity s/qt. 300 50 - 60 40 - 50 Initial Gels lb./100 ft2 50 10 6 10 Minute Gels lb./100 ft2 60 15 8 API Fluid Loss cc/30 min. N.C. – 15.0 5.0 4.0 HPHT Fluid Loss cc/30 min. n/a 8.0 – 12.0 10.0 pH 11.0 9.5 – 10.0 9.0 – 9.5 Surface Hole: A potassium silicate freshwater drilling fluid will be used for the surface interval. Keep flow line viscosity at r 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight ”10.5 ppg by use of solids control system and dilutions where necessary. Application for Permit to Drill, MT7-03 Saved: 22-Apr-21 MT7-03 APD Page 7 of 11 Printed: 22-Apr-21 Intermediate: Fresh water polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Maintain mud weight at or below 11.2 ppg for formation stability and be prepared to add loss circulation material if necessary. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up to 10.8 – 11.2 ppg before pulling out of the hole. Note: Managed Pressure Drilling (MPD) will be utilized for adding backpressure during connections to mitigate shale instability and cycling. Production Hole: The horizontal production interval will be drilled with an water-based bud (FloPro) weighted to 9.0 – 9.5 ppg with calcium carbonate and KCL. MPD will be utilized to hold backpressure, keeping the well dynamically balanced. Diagram of Doyon 25 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005 (c)(11)) N/A - Application is not for an offshore well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005 (c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Discussion of Mud and Cuttings Disposal and Annular Disposal (Requirements of 20 AAC 25.005 (c)(14)) Incidental fluids developed from drilling operations on well MT7-03 will be injected into a permitted annulus on the MT7 pad, or hauled to the Class 1 disposal well on CD1. The MT7-03 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to ~2000' TVD. There will be 500’ of cement placed above the top of the Alpine reservoir along with 500’ above any other reservoir that is encountered per regulations. Once MT7-03 has been drilled and completed, consideration may be given to permit this well for annular injection. An application for Sundry Operations form 10-403 will then be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. () g ppg MPD will be utilized to hold backpressure, keeping the well dynamically balanced. Managed Pressure Drilling (MPD) will be utilized for adding backpressure during connections to mitigateg shale instability and cycling. Application for Permit to Drill, MT7-03 Saved: 22-Apr-21 MT7-03 APD Page 8 of 11 Printed: 22-Apr-21 Surface casing will be set ~50’ below the K3 marker. The upper confining barrier is composed of 1,000 feet TVD of shale and siltstone of the Upper Cretaceous Colville Group. The lower barrier is composed of over 3,000 feet TVD of Torok Group, primarily marine shale with some interbedded thin sands. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig’s specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi = (12.0 ppg) * (0.052) * (3088’) + 1,500 psi = #REF! 3427 psi Pore Pressure = 1,208 psi Therefore Differential = 3427#REF!– 1,208 = #REF! 2,219 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: OD Wt (ppf) Grade Range Connection Type Collapse 85% of Collapse Burst 85% of Burst 13.375” 68 L-80 3 Hyd563 2260 psi 1921 psi 5020 psi 4267 psi 7.625” 29.7 L80 3 Hyd563 4790 psi 4071 psi 6890 psi 5856 psi Application for Permit to Drill, MT7-03 Saved: 22-Apr-21 MT7-03 APD Page 9 of 11 Printed: 22-Apr-21 14. Drilling Hazards Summary (To be posted in Rig Floor Doghouse Prior to Spud) 16" Hole / 13.375” Casing Interval Event Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low First well on Pad, traveling cylinder diagrams Gas Hydrates Low If observed – control drill, reduce pump rates and circulating time, reduce mud temperatures Clay Balling Medium Maintain planned mud parameters and flow rates, Increase mud weight, use weighted sweeps, reduce fluid viscosity, control ROP Abnormal Pressure in Surface Formations Low Diverter drills, increased mud weight. Shallow hazard study noted minimal risk Lost Circulation Medium Reduce pump rates, mud rheology, add lost circulation material, use of low density cement slurries, port collar, control pipe running speeds 9-7/8 x 11” Hole /7.625” Liner - Casing Interval Event Risk Level Mitigation Strategy Sloughing shale, Tight hole High MPD for shale stability, Steerable Drilling Liner, Increase mud weight, control ROP, connection and trip speeds, sweeps, and real time equivalent circulating density (ECD) monitoring, run casing as liner Lost circulation Low Reduce pump rates, reduce trip speeds, real time ECD monitoring, mud rheology, add lost circulation material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, proper hole filling, pump out of hole, real time ECD monitoring, Liner will be in place at TD Abnormal Reservoir Pressure Low Well control drills, check for flow during connections, increase mud weight Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers Sloughing shale, Tight hole Medium MPD for shale stability, Steerable Drilling Liner, Increase mud weight, control ROP, connection and trip speeds, sweeps, and real time equivalent circulating density (ECD) monitoring, run casing as liner 6.5” Hole / 4.5” Liner - Horizontal Production Hole Event Risk Level Mitigation Strategy Lost circulation Low Reduce pump rates, reduce trip speeds, real time ECD monitoring, mud rheology, add lost circulation material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, Application for Permit to Drill, MT7-03 Saved: 22-Apr-21 MT7-03 APD Page 10 of 11 Printed: 22-Apr-21 proper hole filling, pump out of hole, real time ECD monitoring Abnormal Reservoir Pressure Low Well control drills, check for flow during connections, increased mud weight Differential Sticking Low Uniform reservoir pressure along lateral, keep pipe moving, control mud weight Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers Well Proximity Risks: MT7 will be a multi-well pad, containing an original plan of 36 wells. Directional drilling / collision avoidance information as required by AOGCC 20 ACC 25.050 (b) is provided in the following attachments. Drilling Area Risks: Reservoir Pressure: Offset injection has the potential to increase reservoir pressure over predicted. Although this is unlikely, the rig will be prepared to weight up if required. Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the intermediate section. Lower Shale Stability: HRZ/Kalubik/Miluveach will require higher mud weights than historically used to enhance wellbore stability. Managed Pressure Drilling will be used in conjunction with a 4-string casing design if needed, to mitigate shale instability in the aforementioned formations. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation if needed. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. y qg g y Managed Pressure Drilling will be used in conjunction with a 4-string casing design if needed, toy mitigate shale instability Application for Permit to Drill, MT7-03 Saved: 22-Apr-21 MT7-03 APD Page 11 of 11 Printed: 22-Apr-21 15. Proposed Completion Schematic Attachment 1 – Area of Review (AOR) An Area of Review plot is show below of the MT7-03 planned wellpath and offset wells. Due to the fact that MT7-03 is the second well on the MT7 pad, there are no other offsets within the ¼ mile review. Well Name Status Top of Alpine Pool (MD/TVD) TOC (MD/TVD) TOC – Determined By Reservoir Status Zonal Isolation Cement Operations Summary N/A N/A N/A N/A N/A N/A N/A N/A t MT7-03 is the second well on the MT7 pad, there are no other offsets within the ¼ mile review. 40 500 500 1000 1000 1500 1500 2000 2000 2500 2500 3000 3000 5000 5000 8000 8000 12000 12000 17000 17000 22300 MT7-03 wp03 Plan Summary 0 3 Dogleg Severity3500 7000 10500 14000 17500 21000 24500 Measured Depth Surface Csg Intermediate Csg 45 45 90 90 0 90 180 270 30 210 60 240 120 300 150 330 Azimuth from North [°] vs Travelling Cylinder Separation [90 usft/in] 40 1983 2474 MT7-01 wp05 40 993 MT7-02 wp04 40 994 MT7-04 wp03 40 2015 2522 MT7-05 wp03 100 1090 40 MT7-07 wp02 992 MT7-99 wp02 115 0 4500 True Vertical Depth-2000 0 2000 4000 6000 8000 10000 12000 Vertical Section at 323.00° Surface Csg Intermediate Csg 0 50 100 Centre to Centre Separation0 1000 2000 3000 4000 5000 6000 7000 Measured Depth Equivalent Magnetic Distance DDI 7.194 SURVEY PROGRAM Date: 2017-03-21T00:00:00 Validated: Yes Version: Depth From Depth To Survey/Plan Tool 39.50 900.00 MT7-03 wp03 (MT7-03) GYD-GC-SS 900.00 1900.00 MT7-03 wp03 (MT7-03) MWD OWSG 1900.00 3556.00 MT7-03 wp03 (MT7-03) MWD+IFR2+SAG+MS 3556.00 3666.00 MT7-03 wp03 (MT7-03) MWD-INC_ONLY (INC>10°) 3666.00 5166.00 MT7-03 wp03 (MT7-03) MWD OWSG 3666.00 12260.00 MT7-03 wp03 (MT7-03) MWD+IFR2+SAG+MS 12260.00 12360.00 MT7-03 wp03 (MT7-03) MWD-INC_ONLY (INC>10°) 12360.00 13860.00 MT7-03 wp03 (MT7-03) MWD OWSG 12360.00 24695.27 MT7-03 wp03 (MT7-03) MWD+IFR2+SAG+MS Surface Location North / 5915561.84 East / 1430026.36 Ground / 100.00 CASING DETAILS TVD MD Name 3088.00 3556.51 Surface Csg 8399.92 12260.12 Intermediate Csg Mag Model & Date: BGGM2020 01-May-21 Magnetic North is 14.91° East of True North (Magnetic Declinatio Mag Dip & Field Strength: 80.42° 57163.50nT SECTION DETAILS Sec MD Inc Azi TVD +N/-S +E/-W Dleg TFace VSect Target Annotation 1 39.50 0.00 0.00 39.50 0.00 0.00 0.00 0.00 0.00 2 650.00 0.00 168.00 650.00 0.00 0.00 0.00 168.00 0.00 Start Build 1.50 3 850.00 3.00 168.00 849.91 -5.12 1.09 1.50 168.00 -4.74 Start Build 2.00 41150.00 9.00 168.00 1148.13 -35.78 7.61 2.00 0.00 -33.15 Start DLS 2.50 TFO 43.91 5 2775.95 47.47 205.81 2560.38 -728.83 -237.17 2.50 43.91 -439.34 Start 5749.07 hold at 2775.95 MD 68525.02 47.47 205.81 6446.53 -4542.84 -2081.88 0.00 0.00-2375.16 Start DLS 3.00 TFO 112.77 712060.12 85.00 323.00 8382.49 -4207.50 -4416.84 3.00 112.77 -702.14 Start 200.00 hold at 12060.12 MD 812260.12 85.00 323.00 8399.92 -4048.38 -4536.74 0.00 0.00 -502.90 Start 20.00 hold at 12260.12 MD 912280.12 85.00 323.00 8401.66 -4032.47 -4548.74 0.00 0.00 -482.98 Start DLS 2.50 TFO 60.04 1012742.79 90.82 333.00 8418.56 -3640.98 -4793.25 2.50 60.04 -23.16 Start 11952.48 hold at 12742.79 MD 1124695.27 90.82 333.00 8246.73 7008.11-10218.12 0.00 0.0011746.35 TD at 24695.27 FORMATION TOP DETAILS TVDPathFormation 949.50Base Perm 1404.54 C-40 1661.21 C-30 2011.25 C-10 3038.32 K-3 3640.59 Alb 97 3874.81 Alb 96 4048.10 Alb 95 4612.15 Alb 94 4982.17 Alb 93 6301.22 Alb 92 7444.41 HRZ 7650.80 LCU 8312.63 Alpine C / TPI By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all surroundingwells are assigned to the proper position, and I approve the scan and collision avoidance plan as set out in the audit pack.I approve it as the basiis for the final well plan and wellsite drawings. I also acknowledge that unless notified otherwise all targets have a 100 feet lateral tolerance. Prepared by Checked by Accepted by Approved by Plan 100+39.5 @ 139.50usft 040008000True Vertical Depth (2000 usft/in)-4000 0 4000 8000 12000Vertical Section at 323.00° (2000 usft/in)MT7-03 Tgt 2 102720MT7-03 Tgt 2 102620MT7-03 Tgt 1.5 H 102620MT7-03 Tgt 1 102620Surface CsgIntermediate Csg10002000300040005000600070008000900010000110001200013 000 15 0 0 0 16 000 17000 18 000 19 000 20000 21000 22000 23000 24000 24695MT7-03 (GMT2 SW03-108)/MT7-03 wp03 Section View Project: Western North SlopeSite: GMT2 Rendezvous PadWell: MT7-03 (GMT2 SW03-108)Wellbore: MT7-03Design: MT7-03 wp03 Plan View Project: Western North SlopeSite: GMT2 Rendezvous PadWell: MT7-03 (GMT2 SW03-108)Wellbore: MT7-03Design: MT7-03 wp03-400004000South(-)/North(+) (2000 usft/in)-12000 -8000 -4000 0 4000West(-)/East(+) (2000 usft/in)Surface CsgIntermediate Csg100020004000500060007000 8000MT7-03 (GMT2 SW03-108)/MT7-03 wp03 Certificate Of Completion Envelope Id: 5A3D43EE872743528BDF8174795FBD3C Status: Completed Subject: Please DocuSign: MT7-03 Combined AOGCC PTD.pdf Source Envelope: Document Pages: 44 Signatures: 1 Envelope Originator: Certificate Pages: 5 Initials: 0 Brad Gorham AutoNav: Enabled EnvelopeId Stamping: Disabled Time Zone: (UTC-06:00) Central Time (US & Canada) 935 N Eldridge Pkwy Houston, TX 77079 Brad.Gorham@conocophillips.com IP Address: 138.32.8.5 Record Tracking Status: Original 4/22/2021 3:34:50 PM Holder: Brad Gorham Brad.Gorham@conocophillips.com Location: DocuSign Signer Events Signature Timestamp Chris Brillon chris.l.brillon@conocophillips.com Security Level: Email, Account Authentication (None) Signature Adoption: Uploaded Signature Image Using IP Address: 138.32.8.5 Sent: 4/22/2021 3:36:36 PM Viewed: 4/22/2021 4:47:05 PM Signed: 4/22/2021 4:54:56 PM Electronic Record and Signature Disclosure: Accepted: 4/22/2021 4:47:05 PM ID: 2a498d9b-3ef9-4f34-8493-5b6321a84591 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Brad Gorham brad.gorham@conocophillips.com ConocoPhillips Security Level: Email, Account Authentication (None) Sent: 4/22/2021 3:36:36 PM Resent: 4/22/2021 4:55:08 PM Viewed: 4/22/2021 5:37:51 PM Electronic Record and Signature Disclosure: Accepted: 11/17/2020 1:40:42 PM ID: 515f5087-2ab8-40c0-8058-8ccd6a202c68 Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 4/22/2021 3:36:36 PM Certified Delivered Security Checked 4/22/2021 4:47:05 PM Signing Complete Security Checked 4/22/2021 4:54:56 PM Envelope Summary Events Status Timestamps Completed Security Checked 4/22/2021 4:54:56 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure From:Gorham, Brad To:Loepp, Victoria T (OGC) Subject:RE: [EXTERNAL]GMTU MT7-03 (PTD 221-024) Diverter Route/Kick Tolerance calcs Date:Tuesday, May 4, 2021 3:01:59 PM Attachments:MT7-03 KT.xlsx Victoria, Nothing will have changed from the time MT7-04 was drilled to when MT7-03 is planned. With that being the case the verbiage previously supplied will still be applicable while we are drilling on diverter on the MT7-03 well. The first structure that the diverter would encounter, as you travel South from the rig, is a group of pits that the diverter will run adjacent to. The next structure is to be a truck loading and unloading area. This truck loading structure is not present and construction will not commence until later in the summer. The MT7G and MT7E buildings will be in place during the time of diverter use. We will be running the diverter under the stairs of MT7G and adjacent to MT7E. Both the MT7G and MT7E will be decommissioned while we are drilling on diverter to ensure there are no ignition sources. The only other ignition source along the diverter route would be the rig itself. I have also attached the MT7-03 kick tolerance calculations. Please let me know if you have any additional questions or concerns. Thanks, Brad From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Tuesday, May 4, 2021 11:57 AM To: Gorham, Brad <Brad.Gorham@conocophillips.com> Subject: [EXTERNAL]GMTU MT7-03 (PTD 221-024) Diverter Route/Kick Tolerance calcs CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Brad, Could you please identify the buildings that will be in place at the time of drilling and the ignition sources along the route of the diverter? Please provide kick tolerance calculations for the surface casing shoe. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria.Loepp@alaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov From: Gorham, Brad <Brad.Gorham@conocophillips.com> Sent: Wednesday, March 31, 2021 2:56 PM To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Subject: GMTU MT7-04 (PTD 221-017) Diverter Route Victoria, The first structure that the diverter would encounter, as you travel South from the rig, is a group of pits that the diverter will run adjace to. The next structure is to be a truck loading and unloading area. This truck loading structure is not present and construction will not commence until later in the summer. The MT7G and MT7E buildings will be in place during the time of diverter use. We will be running the diverter under the stairs of MT7G and adjacent to MT7E. Both the MT7G and MT7E will be decommissioned while we are drilling on diverter to ensure there are no ignition sources. The only other ignition source along the diverter route would be the rig itself. Please let me know if that didn’t answer your question. Thanks, Brad From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Wednesday, March 31, 2021 9:49 AM To: Gorham, Brad <Brad.Gorham@conocophillips.com> Subject: [EXTERNAL]GMTU MT7-04 (PTD 221-017) Diverter Route Brad, Thank you for the information. Could you please identify the buildings that will be in place at the time of drilling and the ignition sources along the route of the diverter? Thank you, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria.Loepp@alaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov MT7-03 KT.xlsx 4/11/2022 9:43 AM Well: MT7-04 <== Data Input Name: Brad Gorham <== Data Input Mud Weight (ppg)9.50 <== Data Input Weak point or LOT - Measured depth (ft)3,556'<== Data Input Weak point or LOT True vertical depth (ft)3,088'<== Data Input Weak point or LOT - Hole angle (deg)47.0º<== Data Input Weak point or LOT - Hole size (in)11.000"<== Data Input Weak point pressure or LOT - EMW (ppg)12.00 <== Data Input Zone of interest - Measured depth (ft)12,261'<== Data Input Zone of interest - True vertical depth (ft)8,399'<== Data Input Zone of interest - Hole angle (deg)85.0º<== Data Input Zone of interest - Hole size (in)11.000"<== Data Input Zone of interest - Pore pressure EMW (ppg)9.40 <== Data Input Gas gradient (psi/ft)0.10 <== Data Input Bottom hole assembly OD (in)6.750"<== Data Input Bottom hole assembly length (ft)300'<== Data Input Drill pipe OD (in)5.000"<== Data Input BHA annular vol. @ zone of interest (bbl/ft)0.0733 DP annular vol. @ zone of interest (bbl/ft)0.0933 DP annular vol. @ weak point (bbl/ft)0.0933 Additional safety margin (psi)0.00 <== Data Input Weak point pressure (psi):Plo 1,927 psi Weak point pressure - Safety margin:Pmax 1,927 psi Pmax EMW 12.00 ppg Max anticipated formation pressure (psi):Pf 4,105 psi Weak Pt to Zone of Interest distance (TVD ft):OH {TVD}5,311' Weak Pt to Zone of Interest distance (MD ft):OH {MD}8,705' Maximum influx height at the bit (TVD ft):H {TVD}1,130' Maximum influx height at the bit (MD ft):H {MD}12,962' Calc. volume of {H} around BHA:V1bha 22.0 bbl Calc. volume of {H} around drill pipe:V1dp 1180.8 bbl Calc. volume that H equals @ initial shut in:V1 1202.8 bbl Calc. vol. that H equals @ weak point (MD ft):Vwp 154.5 bbl Calc. volume of Vwp @ initial shut in:V2 72.5 bbl Kick Tolerance:V2 72.5 bbl NOTE: Spreadsheet revised by: G. S. Walz 3/9/99 MT7-03 KT.xlsx 4/11/2022 9:43 AM Well: MT7-03 <== Data Input Name: Brad Gorham <== Data Input Mud Weight (ppg)9.20 <== Data Input Weak point or LOT - Measured depth (ft)12,261'<== Data Input Weak point or LOT True vertical depth (ft)8,399'<== Data Input Weak point or LOT - Hole angle (deg)85.0º<== Data Input Weak point or LOT - Hole size (in)11.000"<== Data Input Weak point pressure or LOT - EMW (ppg)11.50 <== Data Input Zone of interest - Measured depth (ft)24,695'<== Data Input Zone of interest - True vertical depth (ft)8,420'<== Data Input Zone of interest - Hole angle (deg)85.0º<== Data Input Zone of interest - Hole size (in)6.500"<== Data Input Zone of interest - Pore pressure EMW (ppg)9.20 <== Data Input Gas gradient (psi/ft)0.10 <== Data Input Bottom hole assembly OD (in)4.750"<== Data Input Bottom hole assembly length (ft)300'<== Data Input Drill pipe OD (in)4.000"<== Data Input BHA annular vol. @ zone of interest (bbl/ft)0.0191 DP annular vol. @ zone of interest (bbl/ft)0.0255 DP annular vol. @ weak point (bbl/ft)0.1020 Additional safety margin (psi)0.00 <== Data Input Weak point pressure (psi):Plo 5,023 psi Weak point pressure - Safety margin:Pmax 5,023 psi Pmax EMW 11.50 ppg Max anticipated formation pressure (psi):Pf 4,028 psi Weak Pt to Zone of Interest distance (TVD ft):OH {TVD}21' Weak Pt to Zone of Interest distance (MD ft):OH {MD}12,434' Maximum influx height at the bit (TVD ft):H {TVD}2,655' Maximum influx height at the bit (MD ft):H {MD}30,459' Calc. volume of {H} around BHA:V1bha N/A Calc. volume of {H} around drill pipe:V1dp N/A Calc. volume that H equals @ initial shut in:V1 N/A Calc. vol. that H equals @ weak point (MD ft):Vwp N/A Calc. volume of Vwp @ initial shut in:V2 N/A Kick Tolerance:N/A See Note NOTE: Maximum influx height (H) extends past the weak pt. Spreadsheet revised by: G. S. Walz 3/9/99 ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, ConocoPhillips (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically !!"   "!     ! !      Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact ConocoPhillips: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: DocuSign.Admin@conocophillips.com To advise ConocoPhillips of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at DocuSign.Admin@conocophillips.com and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address. If you created a DocuSign account, you may update it with your new email address through your account preferences. To request paper copies from ConocoPhillips To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to DocuSign.Admin@conocophillips.com and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with ConocoPhillips To inform us that you no longer wish to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to DocuSign.Admin@conocophillips.com and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide- signing-system-requirements. Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that: x You can access and read this Electronic Record and Signature Disclosure; and x You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and x Until or unless you notify ConocoPhillips as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by ConocoPhillips during the course of your relationship with ConocoPhillips. 1 Davies, Stephen F (CED) From:Gorham, Brad <Brad.Gorham@conocophillips.com> Sent:Wednesday, April 28, 2021 9:08 AM To:Davies, Stephen F (CED) Subject:RE: [EXTERNAL]RE: GMTU MT7-03 (PTD 221-024) - Compilation of Questions Steve,     That clarifies things, thanks for the response. Let me know if there is anything else.     Thanks,     Brad     From: Davies, Stephen F (CED) <steve.davies@alaska.gov>   Sent: Wednesday, April 28, 2021 8:40 AM  To: Gorham, Brad <Brad.Gorham@conocophillips.com>  Cc: Rixse, Melvin G (CED) <melvin.rixse@alaska.gov>; Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>; Boyer, David  L (CED) <david.boyer2@alaska.gov>  Subject: RE: [EXTERNAL]RE: GMTU MT7‐03 (PTD 221‐024) ‐ Compilation of Questions    Brad,    You requested that I clarify the coordinate discrepancy in Item 3 of my email (in the tread, below).     Easting and northing coordinates from CPAI’s Permit to Drill application form (where CPAI provided NAD 83 coordinates  rather than required NAD 27 coordinates):        Similar coordinates from the directional survey in the application package:      The application submitted by CPAI did not contain the illustration displaying the CPAI coordinate converter.      FYI: All X and Y coordinates in AOGCC’s databases and in our printed records reference the NAD 27 datum.  Although  NAD 83 is now the normal reference, AOGCC has retained NAD 27 as our standard coordinate reference so that AOGCC’s  database and all of our printed records are expressed using a single reference standard.  That way confusion—and  2 potential errors—are minimized as public and industry users only have to make a single coordinate conversion from NAD  27 to NAD 83 for all of the wells in AOGCC’s databases and records.      Thank you for your help, and please let me know if you have questions.      Thanks and stay safe,  Steve Davies  AOGCC  CONFIDENTIALITY NOTICE:  This e‐mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission  (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use  or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e‐mail, please delete it, without first saving or forwarding  it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907‐793‐1224 or steve.davies@alaska.gov.          From: Gorham, Brad <Brad.Gorham@conocophillips.com>   Sent: Tuesday, April 27, 2021 4:05 PM  To: Davies, Stephen F (CED) <steve.davies@alaska.gov>  Cc: Rixse, Melvin G (CED) <melvin.rixse@alaska.gov>; Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>; Boyer, David  L (CED) <david.boyer2@alaska.gov>  Subject: RE: [EXTERNAL]RE: GMTU MT7‐03 (PTD 221‐024) ‐ Compilation of Questions    Steve,     See my responses in blue below. My apologies as there were some issues transcribing the data. Let me know if you have  any further questions or need clarification.     Thanks,     Brad     From: Davies, Stephen F (CED) <steve.davies@alaska.gov>   Sent: Friday, April 23, 2021 10:38 AM  To: Gorham, Brad <Brad.Gorham@conocophillips.com>  Cc: Rixse, Melvin G (CED) <melvin.rixse@alaska.gov>; Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>; Boyer, David  L (CED) <david.boyer2@alaska.gov>  Subject: [EXTERNAL]RE: GMTU MT7‐03 (PTD 221‐024) ‐ Compilation of Questions    CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.       Brad,    To avoid confusion and to ensure that nothing is overlooked, I've compiled all of my previous questions and requests  regarding CPAI's Permit to Drill application for MT7‐03 into this email.    3 1. Could ConocoPhillips please provide a copy of the planned directional survey data in either spreadsheet or ASCII  table format?  This will speed my portion of the review and ensure accuracy within our geoscience  workstations. See attached.   2. The coordinates for the surface location of the well in box 4b are incorrect.  They do not reference the NAD 27  datum.  The NAD 27 coordinates presented should be close to  X = 289,990 and Y = 5,915,818. You are correct,  the NAD 27 coordinates should be as follows: X = 289,989.9, Y = 5,915,817.8  3. Although the location coordinates on the application form reference NAD 83, they do not match the NAD 83  coordinates for the well shown on the proposed directional survey (the difference is about 175’).  Please submit  a revised directional survey if necessary. Can you please clarify the discrepancy or is this a rounding error? I have  pasted screenshots of what was submitted on the application form, the surface location on the directional plan  and the coordinate conversion below.       4. The KB elevation shown on the application form is 100.4’, but the proposed directional survey lists the TVD  reference as 139.5’.  Ground level shown on the application form is 39.5’, but the proposed directional survey  shows ground level as 100’. Which values are correct? The GL is 100.4’ and the KB is 39.5’.   4 5. The values shown on the application form for the maximum potential surface and downhole pressures don’t  match any values presented in the ASP calculations section. The values recorded on the application form were  calculated using a 0.22 psi/ft gradient, which is the gradient utilized by the BLM and was carried over. The ASP  values calculated in the ASP calc section are correct.   6. On the application form, the  "Yes" or "No" boxes associated with the question "Hydraulic Fracture planned?"  have been left unchecked.  I assume CPAI does not plan to fracture MT7‐03, correct? No hydraulic fracture is  planned as this is an injector.   7. Aside from sonic logs for cement evaluation purposes, CPAI's application does not contain a well logging  program. Could CPAI please provide one? If such a program is not provided, in addition to sonic logs for cement  evaluation, the minimum logging suite required for this well will be gamma ray from base of conductor to total  depth of the well and resistivity from the 7‐5/8” casing shoe to total depth of the well.  Please note that it is  AOGCC’s longstanding requirement that a mud log and full suite of petrophysical well logs be acquired from at  least one well at each drill site. (See Rule 5 from CO 747 for the Lookout Oil Pool.)  Does CPAI plan to acquire this  information from either MT7‐03 or MT7‐04?  If not, from any wells planned for the near future? See below for  the logging program. We will be running a sonic log for cement evaluation and yes the mud log and full suite of  logs will be provided from MT7‐03 and MT7‐04.   Surface Interval       Acoustic Dir&Azim Res GR     Intermediate Interval    Acoustic Porosity Caliper Density Dir&Azim GR RES NBI  Production Interval   NMR Porosity Caliper Density Res Image Dir&Azm GR/RES Sonic NBI    8. CPAI's cover letter states that 7‐5/8” casing will be set and cemented to cover 500' MD or 250' TVD above any  hydrocarbon‐bearing zones.  How will CPAI determine what constitutes a hydrocarbon‐bearing zone? This will  be based primarily on resistivity values across the interval while also taking into consideration the gas response  and cuttings description.   9. Is it correct that H2S has not been encountered to date in any exploratory or development wells drilled to the  Alpine reservoir in the Greater Moose’s Tooth Unit? No H2S has been encountered.     Thanks for your help.  AOGCC’s engineering staff may submit additional questions through separate emails.    Thanks again and stay safe,  Steve Davies  Senior Petroleum Geologist  Alaska Oil and Gas Conservation Commission (AOGCC)  CONFIDENTIALITY NOTICE:  This e‐mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission  (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use  or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e‐mail, please delete it, without first saving or forwarding  it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907‐793‐1224 or steve.davies@alaska.gov.      Revised 2/2015 TRANSMITTAL LETTER CHECKLIST WELL NAME: ______________________________________ PTD: _____________________________________________ ___ Development ___ Service ___ Exploratory ___ Stratigraphic Test ___ Non-Conventional FIELD: ____________________________ POOL: ______________________________________ Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL (If last two digits in API number are between 60-69) The permit is for a new wellbore segment of existing well Permit No. _____________, API No. 50-_______________________. Production should continue to be reported as a function of the original API number stated above. Pilot Hole In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name (_______________________PH) and API number (50-_____________________) from records, data and logs acquired for well (name on permit). Spacing Exception The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. (_____________________________) as Operator assumes the liability of any protest to the spacing exception that may occur. Dry Ditch Sample All dry ditch sample sets submitted to the AOGCC must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non- Conventional Well Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for well ( ) until after ( ) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (________________________) must contact the AOGCC to obtain advance approval of such water well testing program. Well Logging Requirements Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (_______________________________) in the attached application, the following well logs are also required for this well: Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. GMTU MT7-03 221-024 Greater Moose's Tooth X ConocoPhillips In addition to the sonic cement evaluation logs mentioned in CPAI's planned operations program, the logging program proposed in CPAI's (B. Gorham) email to AOGCC (S. Davies) dated 4/27/2021 must be conducted. X Alpine Undefined Oil WELL PERMIT CHECKLISTCompanyHilcorp Alaska, LLCWell Name:GMTU MT 7-03Initial Class/TypeSER / PENDGeoArea890Unit10750On/Off ShoreOnProgramSERField & PoolWell bore segAnnular DisposalPTD#:2210240GRTR MOOSES TTH, ALPINE UN OIL - 282050NA1Permit fee attachedYesSurface Location lies within AA081800; Top Productive Interval lies in AA081781;2Lease number appropriateYesTD lies in AA081803. Portion of productive interval also lies in AA081800.3Unique well name and numberNoAlpine Undefined Oil Pool at present. CPAI has applied for pool rules for Rendezvous Oil Pool.4Well located in a defined poolYes5Well located proper distance from drilling unit boundaryYesStatewide spacing applies.6Well located proper distance from other wellsYes7Sufficient acreage available in drilling unitYes8If deviated, is wellbore plat includedYes9Operator only affected partyYes10Operator has appropriate bond in forceYes11Permit can be issued without conservation orderYes12Permit can be issued without administrative approvalYes13Can permit be approved before 15-day waitNA14Well located within area and strata authorized by Injection Order # (put IO# in comments) (ForNA15All wells within 1/4 mile area of review identified (For service well only)NA16Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)Yes80' conductor driven18Conductor string providedYesSurface casing set to 3556' MD19Surface casing protects all known USDWsYes226% excess cement planned20CMT vol adequate to circulate on conductor & surf csgNo21CMT vol adequate to tie-in long string to surf csgNoProductive interval will be completed with uncemented perforated joints22CMT will cover all known productive horizonsYes23Casing designs adequate for C, T, B & permafrostYesRig has steel tanks; all waste to approved disposal wells24Adequate tankage or reserve pitNA25If a re-drill, has a 10-403 for abandonment been approvedYesAnti-collision analysis complete; no major risk failures26Adequate wellbore separation proposedYesDiverter discharge route and diverter meet regulation27If diverter required, does it meet regulationsYesMax reservoir pressure is 3950 psig(9.2 ppg EMW); will drill w/ 8.8 to 11.2 ppg EMW; MPD will be utilized28Drilling fluid program schematic & equip list adequateYesMPSP is 2992 psig; will test BOPs to 3500 psig29BOPEs, do they meet regulationYes30BOPE press rating appropriate; test to (put psig in comments)Yes31Choke manifold complies w/API RP-53 (May 84)Yes32Work will occur without operation shutdownNo33Is presence of H2S gas probableYesNo wells in 1/4 mile radius34Mechanical condition of wells within AOR verified (For service well only)YesNone anticipated based on nearby wells. Rig has sensors and alarms.35Permit can be issued w/o hydrogen sulfide measuresYesDrilling fluid program appears adequate to control operator’s forecast pressures. Managed Pressure36Data presented on potential overpressure zonesNADrilling Technique (MPD) will be used to stabilize shale sections in intermediate hole.37Seismic analysis of shallow gas zonesNAProduction interval will be drilled with 8.8-9.5 ppg mud using MPD.38Seabed condition survey (if off-shore)NA39Contact name/phone for weekly progress reports [exploratory only]ApprSFDDate4/28/2021ApprVTLDate5/4/2021ApprSFDDate4/23/2021AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDateJMP5/4/21JLC 5/4/2021