Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout223-049DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s We l l L o g I n f o r m a t i o n : Di g i t a l Me d / F r m t Re c e i v e d St a r t S t o p OH / CH Co m m e n t s Lo g Me d i a Ru n No El e c t r Da t a s e t Nu m b e r Na m e In t e r v a l Li s t o f L o g s O b t a i n e d : GR , R E S , D E N , D I R , A Z I , P W D , N E U , P O R , S O N I C , C A L I P E R No No Ye s Mu d L o g S a m p l e s D i r e c t i o n a l S u r v e y RE Q U I R E D I N F O R M A T I O N (f r o m M a s t e r W e l l D a t a / L o g s ) DA T A I N F O R M A T I O N Lo g / Da t a Ty p e Lo g Sc a l e DF 9/ 2 5 / 2 0 2 3 60 0 0 1 5 3 2 5 E l e c t r o n i c D a t a S e t , F i l e n a m e : G M T U M T 7 - 94 _ R M _ S o n i c S c o p e _ T o p o f C e m e n t _ L A S . l a s 38 0 0 9 ED Di g i t a l D a t a DF 9/ 2 5 / 2 0 2 3 E l e c t r o n i c F i l e : G M T U M T 7 - 14 A _ R M _ S o n i c S c o p e _ T o p o f C e m e n t _ D L I S . d l i s 38 0 0 9 ED Di g i t a l D a t a DF 9/ 2 5 / 2 0 2 3 E l e c t r o n i c F i l e : G M T U M T 7 - 94 _ R M _ S o n i c S c o p e _ T o p o f Ce m e n t _ 1 0 0 0 _ M D . P d f 38 0 0 9 ED Di g i t a l D a t a DF 9/ 2 5 / 2 0 2 3 E l e c t r o n i c F i l e : G M T U M T 7 - 94 _ R M _ S o n i c S c o p e _ T o p o f Ce m e n t _ 2 0 0 0 _ M D . P d f 38 0 0 9 ED Di g i t a l D a t a DF 9/ 2 5 / 2 0 2 3 E l e c t r o n i c F i l e : G M T U M T 7 - 94 _ R M _ S o n i c S c o p e _ T o p o f Ce m e n t _ 2 0 0 _ M D . P d f 38 0 0 9 ED Di g i t a l D a t a DF 9/ 2 5 / 2 0 2 3 E l e c t r o n i c F i l e : G M T U M T 7 - 94 _ R M _ S o n i c S c o p e _ T o p o f Ce m e n t _ 4 0 0 0 _ M D . P d f 38 0 0 9 ED Di g i t a l D a t a DF 9/ 2 5 / 2 0 2 3 E l e c t r o n i c F i l e : G M T U M T 7 - 94 _ R M _ S o n i c S c o p e _ T o p o f Ce m e n t _ 5 0 0 _ M D . P d f 38 0 0 9 ED Di g i t a l D a t a DF 9/ 2 5 / 2 0 2 3 E l e c t r o n i c F i l e : G M T U M T 7 - 94 _ R M _ S o n i c S c o p e _ T o p o f Ce m e n t _ 6 0 0 0 _ M D . P d f 38 0 0 9 ED Di g i t a l D a t a DF 9/ 2 5 / 2 0 2 3 E l e c t r o n i c F i l e : G M T U M T 7 - 94 _ R M _ S o n i c S c o p e _ T o p o f C e m e n t _ D L I S In f o V i e w . h t m l 38 0 0 9 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 22 7 2 6 9 8 9 E l e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ F E _ C O M P _ M E M . L A S 38 0 9 2 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 1 o f 1 6 CP A I _ M T 7 - , 94_ F E _ CO MP _ M E M . L A S DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s DF 10 / 2 0 / 2 0 2 3 22 7 2 6 9 8 9 E l e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ F E _ C O M P _ M E M _ F u l l H e a d e r . L A S 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ A P - L O G T I M E _ R U N 0 3 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ A P - L O G T I M E _ R U N 0 4 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ A P - L O G T I M E _ R U N 0 5 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ A P - L O G T I M E _ R U N 0 6 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ A P - L O G T I M E _ R U N 0 7 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ A P - L O G T I M E _ R U N 0 8 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ A P - L O G _ T I M E _ R U N 0 1 _ M E M _ . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ A P - L O G _ T I M E _ R U N 0 2 _ M E M _ . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 22 7 2 6 9 9 1 E l e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ 5 M D _ V S S - D E P T H _ C O M P _ M E M . L A S 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ V S S - L O G T I M E _ R U N 0 4 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ V S S - L O G T I M E _ R U N 0 5 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ V S S - L O G T I M E _ R U N 0 6 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ V S S - L O G T I M E _ R U N 0 7 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ V S S - L O G T I M E _ R U N 0 8 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ V S S - L O G _ T I M E _ R U N 0 1 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ V S S - L O G _ T I M E _ R U N 0 2 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ V S S - L O G _ T I M E _ R U N 0 3 _ M E M . l a s 38 0 9 2 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 2 o f 1 6 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s DF 10 / 2 0 / 2 0 2 3 41 5 0 1 0 9 3 0 E l e c t r o n i c D a t a S e t , F i l e n a m e : 12 . 5 _ C P A I _ M T 7 _ 9 4 _ M T K _ L M R 1 1 0 . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 40 8 0 1 0 9 3 0 E l e c t r o n i c D a t a S e t , F i l e n a m e : C P A I _ M T 7 - 94 _ 5 M D _ S D T K _ M E M _ 4 0 8 0 _ 1 0 9 3 0 . l a s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ A P - L O G TI M E _ R U N 0 3 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ A P - L O G TI M E _ R U N 0 4 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ A P - L O G TI M E _ R U N 0 5 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ A P - L O G TI M E _ R U N 0 6 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ A P - L O G TI M E _ R U N 0 7 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ A P - L O G TI M E _ R U N 0 8 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ A P - LO G _ T I M E _ R U N 0 1 _ M E M _ . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ A P - LO G _ T I M E _ R U N 0 2 _ M E M _ . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ V S S - L O G TI M E _ R U N 0 4 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ V S S - L O G TI M E _ R U N 0 5 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ V S S - L O G TI M E _ R U N 0 6 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ V S S - L O G TI M E _ R U N 0 7 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ V S S - L O G TI M E _ R U N 0 8 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ V S S - LO G _ T I M E _ R U N 0 1 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ V S S - LO G _ T I M E _ R U N 0 2 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ V S S - LO G _ T I M E _ R U N 0 3 _ M E M . a s c 38 0 9 2 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 3 o f 1 6 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : CP A I _ M T 7 _ 9 4 _ F E _ P R O C E S S E D _ L T K _ I M A G E _ Ru n _ 3 . d l i s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : CP A I _ M T 7 _ 9 4 _ F E _ P R O C E S S E D _ L T K _ I M A G E _ Ru n _ 3 . m e t a 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : CP A I _ M T 7 _ 9 4 _ F E _ P R O C E S S E D _ L T K _ I M A G E _ Ru n _ 3 . P D F 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : CP A I _ M T 7 _ 9 4 _ F E _ P R O C E S S E D _ L T K _ I M A G E _ Ru n _ 3 . t i f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 12 . 5 _ C P A I _ M T 7 _ 9 4 _ M T K _ L M R 1 1 0 . c g m 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 12 . 5 _ C P A I _ M T 7 _ 9 4 _ M T K _ L M R 1 1 0 . d l i s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 12 . 5 _ C P A I _ M T 7 _ 9 4 _ M T K _ L M R 1 1 0 . p d f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 M D _ S D T K _ M E M _ 4 0 8 0 _ 1 0 9 3 0 . d l i s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 M D _ S D T K _ M E M _ 4 0 8 0 _ 1 0 9 3 0 _ d l i s . t x t 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 M D _ S D T K _ M E M _ D T C _ 4 0 8 0 _ 1 0 9 3 0 . c g m 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 M D _ S D T K _ M E M _ D T C _ 4 0 8 0 _ 1 0 9 3 0 . P D F 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 M D _ S D T K _ M E M _ D T S _ 4 0 8 0 _ 1 0 9 3 0 . c g m 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 M D _ S D T K _ M E M _ D T S _ 4 0 8 0 _ 1 0 9 3 0 . P D F 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 M D _ S D T K _ M E M _ W I D E B E D _ 4 0 8 0 _ 1 0 9 3 0 . c gm 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 M D _ S D T K _ M E M _ W I D E B E D _ 4 0 8 0 _ 1 0 9 3 0 . P DF 38 0 9 2 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 4 o f 1 6 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ C A L I P E R _ I MA G E _ 1 _ 2 4 0 _ R 7 . m e t a 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ C A L I P E R _ I MA G E _ 1 _ 2 4 0 _ R 7 . P D F 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ C A L I P E R _ I MA G E _ 1 _ 2 4 0 _ R 7 . t i f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ L T K _ C A L _ I MA G E S _ R 7 . d l i s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ L T K _ I M A G E_ 1 _ 2 4 0 _ R 7 . m e t a 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ L T K _ I M A G E_ 1 _ 2 4 0 _ R 7 . P D F 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ L T K _ I M A G E_ 1 _ 2 4 0 _ R 7 . t i f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ S T K _ I M A G E_ 1 _ 2 4 0 . P D F 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ S T K _ I M A G E_ 1 _ 2 4 0 _ R 7 . m e t a 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ S T K _ I M A G E_ 1 _ 2 4 0 _ R 7 . t i f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ S T K _ I M A G E_ 1 _ 4 8 _ R 7 . m e t a 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ S T K _ I M A G E_ 1 _ 4 8 _ R 7 . P D F 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ S T K _ I M A G E_ 1 _ 4 8 _ R 7 . t i f 38 0 9 2 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 5 o f 1 6 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ S T K _ L T K _ CA L _ I M A G E S _ R 7 . d l i s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ S T K _ M A G ES _ R 7 . d l i s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ C A L I P E R _ I MA G E _ 1 _ 2 4 0 _ R 8 . m e t a 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ C A L I P E R _ I MA G E _ 1 _ 2 4 0 _ R 8 . P D F 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ C A L I P E R _ I MA G E _ 1 _ 2 4 0 _ R 8 . t i f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ L T K _ C A L _ I MA G E S _ R 8 . d l i s 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ L T K _ I M A G E_ 1 _ 2 4 0 _ R 8 . m e t a 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ L T K _ I M A G E_ 1 _ 2 4 0 _ R 8 . P D F 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : 1 1 1 8 5 3 0 1 4 _ C o n o c o _ M T 7 - 94 _ 2 0 2 3 1 0 0 5 0 8 0 6 3 4 _ P R O C E S S E D _ L T K _ I M A G E_ 1 _ 2 4 0 _ R 8 . t i f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 2 M D _ C O M P _ M E M . c g m 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 2 T V D _ C O M P _ M E M . c g m 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 M D _ C O M P _ M E M . c g m 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 M D _ Q U A D _ C O M P _ M E M . c g m 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ 5 M D _ V S S - DE P T H _ C O M P _ M E M . c g m 38 0 9 2 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 6 o f 1 6 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 T V D _ C O M P _ M E M . c g m 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 T V D _ Q U A D _ C O M P _ M E M . c g m 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ A P - TI M E _ C O M P _ M E M . c g m 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ V S S - TI M E _ C O M P _ M E M . c g m 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 2 M D _ C O M P _ M E M . p d f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 2 T V D _ C O M P _ M E M . p d f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 M D _ C O M P _ M E M . p d f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 M D _ Q U A D _ C O M P _ M E M . p d f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ 5 M D _ V S S - DE P T H _ C O M P _ M E M . p d f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 T V D _ C O M P _ M E M . p d f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 94 _ 5 T V D _ Q U A D _ C O M P _ M E M . p d f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ A P - TI M E _ C O M P _ M E M . p d f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ V S S - TI M E _ C O M P _ M E M . p d f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 9 4 N A D 2 7 D e f i n i t i v e Su r v e y s . p d f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 9 4 N A D 2 7 D e f i n i t i v e Su r v e y s . t x t 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 9 4 N A D 2 7 M D I N C A Z I . t x t . t x t 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 9 4 N A D 8 3 D e f i n i t i v e Su r v e y s . p d f 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 9 4 N A D 8 3 D e f i n i t i v e Su r v e y s . t x t 38 0 9 2 ED Di g i t a l D a t a DF 10 / 2 0 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 9 4 N A D 8 3 M D I N C A Z I . t x t 38 0 9 2 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 7 o f 1 6 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s DF 11 / 8 / 2 0 2 3 50 3 6 1 0 9 2 7 E l e c t r o n i c D a t a S e t , F i l e n a m e : M T 7 - 9 4 _ D r i l l i n g Me c h a n i c s D e p t h _ R M _ 5 0 3 6 - 10 9 2 7 f t _ L W D 0 0 1 . l a s 38 1 2 3 ED Di g i t a l D a t a DF 11 / 8 / 2 0 2 3 45 1 6 7 4 5 1 7 4 E l e c t r o n i c D a t a S e t , F i l e n a m e : M T 7 - 9 4 _ D r i l l i n g Me c h a n i c s T i m e _ R M _ 5 0 3 6 - 1 0 9 2 7 f t _ L W D 0 0 1 . l a s 38 1 2 3 ED Di g i t a l D a t a DF 11 / 8 / 2 0 2 3 50 3 6 1 0 9 2 7 E l e c t r o n i c D a t a S e t , F i l e n a m e : M T 7 - 94 _ V I S I O N _ S e r v i c e _ R M _ 5 0 3 6 - 10 9 2 7 f t _ L W D 0 0 1 . l a s 38 1 2 3 ED Di g i t a l D a t a DF 11 / 8 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 94 _ D r i l l i n g _ M e c h a n i c s _ D e p t h _ 2 i n _ M D _ R M _ 5 0 3 6 -1 0 9 2 7 f t _ L W D 0 0 1 . P d f 38 1 2 3 ED Di g i t a l D a t a DF 11 / 8 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 94 _ D r i l l i n g _ M e c h a n i c s _ T i m e _ 2 i n _ R M _ 5 0 3 6 - 10 9 2 7 f t _ L W D 0 0 1 . P d f 38 1 2 3 ED Di g i t a l D a t a DF 11 / 8 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 9 4 _ R M _ 5 0 3 6 - 1 0 9 2 7 f t _ D L I S In f o V i e w _ L W D 0 0 1 . h t m l 38 1 2 3 ED Di g i t a l D a t a DF 11 / 8 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 9 4 _ R M _ 5 0 3 6 - 10 9 2 7 f t _ D L I S _ L W D 0 0 1 . d l i s 38 1 2 3 ED Di g i t a l D a t a DF 11 / 8 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 94 _ V I S I O N _ S e r v i c e _ 2 i n _ M D _ R M _ 5 0 3 6 - 10 9 2 7 f t _ L W D 0 0 1 . p d f 38 1 2 3 ED Di g i t a l D a t a DF 11 / 8 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 94 _ V I S I O N _ S e r v i c e _ 2 i n _ T V D _ R M _ 5 0 3 6 - 10 9 2 7 f t _ L W D 0 0 1 . p d f 38 1 2 3 ED Di g i t a l D a t a DF 11 / 8 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 94 _ V I S I O N _ S e r v i c e _ 5 i n _ M D _ R M _ 5 0 3 6 - 10 9 2 7 f t _ L W D 0 0 1 . p d f 38 1 2 3 ED Di g i t a l D a t a DF 11 / 8 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 94 _ V I S I O N _ S e r v i c e _ 5 i n _ T V D _ R M _ 5 0 3 6 - 10 9 2 7 f t _ L W D 0 0 1 . P d f 38 1 2 3 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 40 9 6 1 5 5 2 7 E l e c t r o n i c D a t a S e t , F i l e n a m e : 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 00 _ M T 7 - 9 4 _ G 8 _ R A W _ L A S _ 1 5 5 2 7 F T M D . L A S 38 2 0 1 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 40 9 6 1 5 5 2 7 E l e c t r o n i c D a t a S e t , F i l e n a m e : M T 7 - 94 _ G 8 _ C o r r e c t e d d a t a _ w i t h L i t h o l o g y _ 4 0 9 6 - 15 5 2 7 f t . l a s 38 2 0 1 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 _ M T 7 - 94 _ M U D L O G _ 2 i n c h . p d f 38 2 0 1 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 8 o f 1 6 MT 7 - , 94 _ G 8 _ C o r r e c t e d d a t a _ w i t h L i t h o l o g y _ 4 0 9 6 - __ 155 27 f t . l a s DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 _ M T 7 - 94 _ M U D L O G _ 5 i n c h . p d f 38 2 0 1 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M T 7 - 9 4 _ C u t t i n g s Pe r c e n t a g e s . x l s x 38 2 0 1 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ L 0 0 1 D o w n _ M D T _ E D T A _ E T C S _ D W CH . d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 0 2 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 0 3 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 0 4 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 0 5 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 0 6 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 0 7 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 0 8 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 0 9 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 1 3 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 1 4 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 9 o f 1 6 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 1 5 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 1 6 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 1 7 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 1 8 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 1 9 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 2 3 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 2 4 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 2 5 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 2 7 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 2 8 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 3 0 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 2 _ S t a 0 3 1 _ M D T _ E D T A _ E T C S _ D W C H .d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 3 _ L 0 0 9 U p _ M S C T _ M C I M _ E T C S . d l i s 38 4 2 9 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 1 0 o f 1 6 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 3 _ S t a 0 0 8 _ M S C T _ M C I M _ E T C S . d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 3 _ S t a 0 0 9 _ M S C T _ M C I M _ E T C S . d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 3 _ S t a 0 1 0 _ M S C T _ M C I M _ E T C S . d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 3 _ S t a 0 1 1 _ M S C T _ M C I M _ E T C S . d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : Co n C u _ R 0 3 _ S t a 0 1 2 _ M S C T _ M C I M _ E T C S . d l i s 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ 1 0 - S E P - 20 2 3 _ M D T _ P r i n t r e v 1 . p d f 38 4 2 9 ED Di g i t a l D a t a DF 1/ 1 9 / 2 0 2 4 E l e c t r o n i c F i l e : C P A I _ M T 7 - 9 4 _ 1 0 - S E P - 20 2 3 _ X L R _ P r i n t . P d f 38 4 2 9 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : M T 7 - 9 4 _ P V T _ R E F 2 0 2 3 0 4 9 4 7 - 50 2 3 1 0 8 3 9 8 _ A g e n c y . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : I s o t u b e A n a l y s i s _ M T 7 - 9 4 . p d f 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : I s o t u b e A n a l y s i s _ M T 7 - 9 4 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : M P L C _ M T 7 - 9 4 _ S W C s . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : Q E X Q _ S U M _ M T 7 - 9 4 _ S W C s . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : S O X H L E T _ M T 7 - 9 4 _ S W C s . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : M T 7 - 9 4 _ G C _ G C M S . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 1 5 _ U S 2 7 6 9 4 5 _ 8 9 2 6 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 1 6 _ U S 2 7 6 9 4 6 _ 8 9 3 8 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 1 7 _ U S 2 7 6 9 4 7 _ 8 9 4 8 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 1 8 _ U S 2 7 6 9 4 8 _ 8 9 5 4 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 1 1 o f 1 6 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 1 9 _ U S 2 7 6 9 4 9 _ 8 9 5 8 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 2 0 _ U S 2 7 6 9 5 0 _ 8 9 6 0 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 2 1 _ U S 2 7 6 9 5 1 _ 8 9 6 2 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 2 2 _ U S 2 7 6 9 5 2 _ 8 9 6 4 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 2 3 _ U S 2 7 6 9 5 3 _ 8 9 6 6 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 2 4 _ U S 2 7 6 9 5 4 _ 8 9 6 8 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 2 6 _ U S 2 7 6 9 5 5 _ 8 9 7 0 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 2 7 _ U S 2 7 6 9 5 6 _ 8 9 7 2 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 2 8 _ U S 2 7 6 9 5 7 _ 8 9 7 4 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 2 9 _ U S 2 7 6 9 5 8 _ 8 9 7 6 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 3 0 _ U S 2 7 6 9 5 9 _ 8 9 7 8 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 3 1 _ U S 2 7 6 9 6 0 _ 8 9 8 0 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 3 2 _ U S 2 7 6 9 6 1 _ 8 9 8 2 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 1 2 o f 1 6 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 3 3 _ U S 2 7 6 9 6 2 _ 8 9 9 6 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 3 4 _ U S 2 7 6 9 6 3 _ 9 0 0 5 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 3 5 _ U S 2 7 6 9 6 4 _ 9 0 1 3 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 3 7 _ U S 2 7 6 9 6 5 _ 9 0 2 6 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 3 8 _ U S 2 7 6 9 6 6 _ 9 0 3 6 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 3 9 _ U S 2 7 6 9 6 7 _ 9 0 4 5 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC _ E X T G C _ G 5 2 4 0 0 4 0 _ U S 2 7 6 9 6 8 _ 9 0 5 5 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ A R O _ M 6 2 4 0 9 9 2 _ U S 2 7 6 9 4 5 _ 8 9 2 6 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ A R O _ M 6 2 4 0 9 9 3 _ U S 2 7 6 9 4 9 _ 8 9 5 8 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ A R O _ M 6 2 4 0 9 9 4 _ U S 2 7 6 9 5 6 _ 8 9 7 2 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ A R O _ M 6 2 4 0 9 9 6 _ U S 2 7 6 9 5 9 _ 8 9 7 8 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ A R O _ M 6 2 4 0 9 9 7 _ U S 2 7 6 9 5 7 _ 8 9 7 4 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ A R O _ M 6 2 4 0 9 9 8 _ U S 2 7 6 9 6 2 _ 8 9 9 6 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 1 3 o f 1 6 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ A R O _ M 6 2 4 0 9 9 9 _ U S 2 7 6 9 6 3 _ 9 0 0 5 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ A R O _ M 6 2 4 1 0 0 0 _ U S 2 7 6 9 6 4 _ 9 0 1 3 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ A R O _ M 6 2 4 1 0 0 1 _ U S 2 7 6 9 6 5 _ 9 0 2 6 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ A R O _ M 6 2 4 1 0 0 2 _ U S 2 7 6 9 6 7 _ 9 0 4 5 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ S A T _ M 5 2 4 0 2 0 6 _ U S 2 7 6 9 4 5 _ 8 9 2 6 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ S A T _ M 5 2 4 0 2 0 7 _ U S 2 7 6 9 4 9 _ 8 9 5 8 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ S A T _ M 5 2 4 0 2 1 0 _ U S 2 7 6 9 5 6 _ 8 9 7 2 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ S A T _ M 5 2 4 0 2 1 1 _ U S 2 7 6 9 5 7 _ 8 9 7 4 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ S A T _ M 5 2 4 0 2 1 2 _ U S 2 7 6 9 5 9 _ 8 9 7 8 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ S A T _ M 5 2 4 0 2 1 3 _ U S 2 7 6 9 6 2 _ 8 9 9 6 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ S A T _ M 5 2 4 0 2 1 4 _ U S 2 7 6 9 6 3 _ 9 0 0 5 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ S A T _ M 5 2 4 0 2 1 5 _ U S 2 7 6 9 6 4 _ 9 0 1 3 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ S A T _ M 5 2 4 0 2 1 6 _ U S 2 7 6 9 6 5 _ 9 0 2 6 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 1 4 o f 1 6 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s We l l C o r e s / S a m p l e s I n f o r m a t i o n : Re c e i v e d St a r t S t o p C o m m e n t s To t a l Bo x e s Sa m p l e Se t Nu m b e r Na m e In t e r v a l IN F O R M A T I O N R E C E I V E D Co m p l e t i o n R e p o r t Pr o d u c t i o n T e s t I n f o r m a t i o n Ge o l o g i c M a r k e r s / T o p s Y Y / N A Y Mu d L o g s , I m a g e F i l e s , D i g i t a l D a t a Co m p o s i t e L o g s , I m a g e , D a t a F i l e s Cu t t i n g s S a m p l e s Y / N A Y Y / N A Di r e c t i o n a l / I n c l i n a t i o n D a t a Me c h a n i c a l I n t e g r i t y T e s t I n f o r m a t i o n Da i l y O p e r a t i o n s S u m m a r y Y Y / N A Y Co r e C h i p s Co r e P h o t o g r a p h s La b o r a t o r y A n a l y s e s Y / N A Y / N A Y / N A DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : GC M S _ S A T _ M 5 2 4 0 2 1 7 _ U S 2 7 6 9 6 7 _ 9 0 4 5 . 0 0 - _H H - 1 1 4 1 6 1 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : M T 7 - 9 4 R S W C R o u t i n e C o r e An a l y s i s ( R C A ) R e p o r t 6 - M a y - 2 0 2 4 . x l s x 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : M T 7 - 9 4 S i d e w a l l C o r e De s c r i p t i o n s . x l s 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : 8 9 3 8 . 0 0 _ 1 - 2 4 R . j p g 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : 8 9 4 8 . 0 0 _ 1 - 2 3 R . j p g 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : 8 9 5 4 . 0 0 _ 1 - 2 2 R . j p g 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : 8 9 5 8 . 0 0 _ 1 - 2 0 R . j p g 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : 8 9 6 8 . 0 0 _ 1 - 1 5 R . j p g 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : 8 9 7 6 . 0 0 _ 1 - 1 1 R . j p g 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : 8 9 8 0 . 0 0 _ 1 - 9 R . j p g 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : 8 9 8 2 . 0 0 _ 1 - 8 R . j p g 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : 9 0 0 5 . 0 0 _ 1 - 6 R . j p g 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : 9 0 1 3 . 0 0 _ 1 - 5 R . j p g 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : 9 0 2 6 . 0 0 _ 1 - 4 R . j p g 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : 9 0 4 5 . 0 0 _ 1 - 2 R . j p g 39 5 9 0 ED Di g i t a l D a t a DF 9/ 2 6 / 2 0 2 4 E l e c t r o n i c F i l e : 9 0 5 5 . 0 0 _ 1 - 1 R . j p g 39 5 9 0 ED Di g i t a l D a t a 9/ 2 8 / 2 0 2 3 40 9 0 1 3 5 6 1 61 8 5 9 Cu t t i n g s Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 1 5 o f 1 6 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 We l l N a m e / N o . G M T U M T 7 - 9 4 Co m p l e t i o n S t a t u s WA G I N Co m p l e t i o n D a t e 10 / 1 3 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 4 9 0 Op e r a t o r C o n o c o P h i l l i p s A l a s k a , I n c . MD 26 9 8 9 TV D 81 1 7 Cu r r e n t S t a t u s WA G I N 12 / 2 2 / 2 0 2 5 UI C Ye s Co m m e n t s : Co m p l i a n c e R e v i e w e d B y : Da t e : CO M P L I A N C E H I S T O R Y Da t e C o m m e n t s De s c r i p t i o n Co m p l e t i o n D a t e : 10 / 1 3 / 2 0 2 3 Re l e a s e D a t e : 7/ 5 / 2 0 2 3 Mo n d a y , D e c e m b e r 2 2 , 2 0 2 5 AO G C C Pa g e 1 6 o f 1 6 12 / 2 9 / 2 0 2 5 M. G u h l 223-049 T39590 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.09.26 14:58:14 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, August 29, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Sully Sullivan P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. MT7-94 GMTU MT7-94 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 08/29/2024 MT7-94 50-103-20858-00-00 223-049-0 G SPT 8079 2230490 2020 3505 3505 3507 3508 50 190 190 190 4YRTST P Sully Sullivan 7/15/2024 4 year MIT-IA no issues 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:GMTU MT7-94 Inspection Date: Tubing OA Packer Depth 1260 2290 2260 2255IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSTS240717095040 BBL Pumped:3.7 BBL Returned:3.7 Thursday, August 29, 2024 Page 1 of 1 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 James B. Regg Digitally signed by James B. Regg Date: 2024.08.29 15:35:27 -08'00' TT RR AA NN SS MM II TT TT AA LL FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 330 W. 7 th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: Schlumberger Wireline Backlog – Mooses Tooth DATE: 12/19/2023 Transmitted: North Slope, Mooses Tooth Unit Via hard drive data drop MT7-07 50-103-20841-00 222052_MT7-07_CBP_15Feb2023 222052_MT7-07_IPROF_14Aug23 222052_MT7-07_IPROF_14Mar23 222052_MT7-07_IPROF_25Nov22 222052_MT7-07_Patch_Setting_28Oct23 222052_MT7-07_PPROF_22Aug2022 222052_MT7-07_WFL_16Mar23 MT7-08 50-103-20846-00 222116_MT7-08_IPROF_17Aug23 222116_MT7-08_TTiX-IPROF_2Oct2023 MT7-09 50-103-20837-00 222011_MT7-09_PPROF_01Nov2022 222011_MT7-09_PPROF_03Jul2022 222011_MT7-09_TTiXPerf_04Oct23 MT7-94 50-103-20858-00 223049_MT7-94_MDT-XLROCK- GR_10Sep2023 MT7-95 50-103-20854-00 223035_MT7-95_TubingPuncher_12Jun2023 2of 3 Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com Receipt: Date: Alaska/IT-Support Services GGRE |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512 T38426 T38427 T38428 T38429 T38430 2/29/2024 MT7-94 50-103-20858-00 223049_MT7-94_MDT-XLROCK- GR_10Sep2023 Kayla Junke Digitally signed by Kayla Junke Date: 2024.02.29 11:00:23 -09'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, January 25, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Josh Hunt P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. MT7-94 GMTU MT7-94 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 01/25/2024 MT7-94 50-103-20858-00-00 223-049-0 G SPT 8079 2230490 2020 3424 3424 3424 3424 220 300 300 295 INITAL P Josh Hunt 12/17/2023 I met with Tom Hills and Matt Miller and traveled to location. Checked the gauges and calibration stickers on the gauges used. They had all the necessary paperwork needed. Very good test. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:GMTU MT7-94 Inspection Date: Tubing OA Packer Depth 740 2520 2465 2460IA 45 Min 60 Min Rel Insp Num: Insp Num:mitJDH231217184105 BBL Pumped:7 BBL Returned:7.1 Thursday, January 25, 2024 Page 1 of 1           TTT RR AA NN SS MM II TT TT AA LL FROM:: Sandra D. Lemke, ATO-704 TO:: Meredith Guhl/Kayla Junke ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 330 W. 7th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: MT7-94 DATE: 12/05/2023 Transmitted: NPRA, Greater Moose’s Tooth Via SFTP ____ Geolog Mud log data package MT7-94 MT7-94 is in a federal oil and gas unit. Only with respect to the zmt7-94 Well Data, CPAI hereby waives its rights to indefinitely confidentiality, under 5 U.S.C. 552(b)(4) and (9). Nothing in this communication should be construed as a waiver of indefinite confidentiality on any other wells. Please note that for wells not on state land, a state agency should seek consent from the landowner prior to the release of well data by the state agency. See, e.g., AS43.55.025(f)(2)(C)(i). Here, the landowner is the Bureau of Land Management (BLM) and/or Arctic Slope Regional Corporation (ASRC). Transmittal instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com CC: MT7-94 e-transmittal well folder Receipt: Date: Alaska IT Data Support-GGRE |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512 PTD: 223-049 T38201 12/5/2023 Kayla Junke Digitally signed by Kayla Junke Date: 2023.12.05 14:52:31 -09'00' 1a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: __________________ Service Stratigraphic Test 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: Top of Productive Interval: 2135' FSL, 3600' FEL S25 T10N R1E 9. Ref Elevations: KB: 17. Field / Pool(s): GL: 100.6 BF: Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y- Zone- 4 TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y- Zone- 4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 N/A (ft MSL) 22. Logs Obtained: 23. BOTTOM 20" H-40 120' 13-3/8 L-80 3018' 9-5/8" L-80 7365' 7" L-80 8120' 4 1/2" L-80 8118' 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MCF: Test Period Casing Press: Calculated Gas-MCF: Oil Gravity - API (corr): Press. 24-Hour Rate ACID, FRACTURE, CEMENT SQUEEZE, ETC. CASING, LINER AND CEMENTING RECORD List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, Tail: 128ppg 15.8ppg Class G8.5"x9-7/8" TUBING RECORD 26984' Lead: 254.2bbl 13.0ppg Class G Tail: 152bbl 15.8ppg Class G 8079 12-1/4" 6-1/8" 15352'5.5 15295'MD/8065' TVD 15352'MD/8079' TVD BOTTOM 16" Lead: 456bbl 11.0ppg Blend Tail: 70bbl 15.8 Class G CASING 50-103-20858-00-00 GMT MT7-94 8/23/2023 26989'MD/8117'TVD N/A 139.8 P.O.Box 100360, Anchorage, AK 99510-0360 290133 1073' FSL, 3227' FEL S32 T10N R2E 1647' FSL, 3445' FEL S14 T10N R1E 10/9/2023 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ConocoPhillips Alaska, Inc. WAG Gas 10/13/2023 223-049 985'MD/985'TVD SETTING DEPTH TVD 5932755 TOP HOLE SIZE AMOUNT PULLEDTOP SETTING DEPTH MD GR, RES, DEN, DIR, AZI, PWD, NEU, POR, SONIC, CALIPER PACKER SET (MD/TVD) 15352' 42" 12.6 5915890 Greater Mooses Tooth/Rendezvous AA081800, AA081803, AA081805 932535000, 932538000, 932540000 39' 29 39' 13397' 4086' If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date perf'd or liner run): WT. PER FT.GRADE 279523 274690 CEMENTING RECORD 5922536 If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date perf'd or liner run): Liner (10/9/2023): 15352'MD/8079'TVD - 26984'MD/8118'TVD Gas-Oil Ratio:Choke Size: suspension, or abandonment; or within 90 days of acquisition of the log, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page only if necessary. N/A 39' 39' Per 20 AAC 25.283 (i)(2) attach electronic information 43.5 15526' 39' 7296' 94 68 120' 39' 13549' SIZE DEPTH SET (MD) 10 Yards Sr Res EngSr Pet GeoSr Pet Eng N/A Oil-Bbl: Water-Bbl: Water-Bbl: PRODUCTION TEST Injection Well Date of Test: Oil-Bbl: Flow Tubing Form 10-407 Revised 10/2022 Due within 30 days of Completion, Suspension, or Abandonment By Grace Christianson at 1:16 pm, Nov 15, 2023 Completed 10/13/2023 JSB RBDMS JSB 111723 GDSR-11/22/24 Conventional Core(s): Yes No Sidewall Cores: 30. MD TVD Surface Surface 985 985 C-30 1441 1441 2113 2113 4040 4040 K-2 4743 3315 Albian 97 5287 5287 Albian 96 5713 5713 HRZ 13486 7337 Kalubik 13678 7424 Kuparuk C 13925 7537 13932 7540 15677 8150 26989 8117 31. List of Attachments: Directional Survey, Well Schematic, Cement Operations, Operations Summary 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Brad Gorham Digital Signature with Date: Contact Phone:907-265-6487 General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment; or 90 days after log acquisition, whichever occurs first. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. LCU/Miluveach C-10 Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a current well schematic diagram with each 10-407. Submit 10-407 and attachments in PDF format to aogcc.permitting@alaska.gov. All laboratory analytical reports from a well must be submitted to the AOGCC, no matter when the analyses are conducted per 20 AAC 25.071. Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, as-built, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. TPI (Top of Producing Interval). Authorized Name and INSTRUCTIONS Contact Email:brad.gorham@conocophillips.com Authorized Title: Drilling Engineer K-3 If Yes, list formations and intervals cored (MD/TVD, From/To), and briefly summarize lithology and presence of oil, gas or water (submit separate pages if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071 no matter when acquired. Attached Seperately Formation Name at TD: Alpine C Yes No Well tested? Yes No 28. CORE DATA If Yes, list intervals and formations tested, briefly summarizing test results for each. Attach separate pages if needed and submit detailed test info including reports and Excel or ASCII tables per 20 AAC 25.071. NAME Permafrost - Top Permafrost - Base 29. GEOLOGIC MARKERS and POOL BOUNDARIES: (list all encountered) FORMATION TESTS Top of Productive Interval: Alpine C Form 10-407 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov  Page 1/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/22/2023 06:00 8/22/2023 07:30 1.50 MIRU, MOVE RURD P Prepare, and skid rig floor into rig move position. Disconnect electrical from Pit complex to the pump complex. 0.0 0.0 8/22/2023 07:30 8/22/2023 08:30 1.00 MIRU, MOVE RURD P Lower mast. Disconnect electrical from pump complex to motors complex. 0.0 0.0 8/22/2023 08:30 8/22/2023 10:30 2.00 MIRU, MOVE RURD P Unpin pipe shed complex from sub. Raise the sub, and stomp pipe shed away from sub. Stomp motors and pump complexes away from the rig. Put motors, and pump complexes on suspension. Stomp pit complex away from sub. 0.0 0.0 8/22/2023 10:30 8/22/2023 15:00 4.50 MIRU, MOVE RURD P Stomp sub away from the well (MT7- 14). Stomp pipe shed, and sub into tow position. Hook up jeep to the sub. 0.0 0.0 8/22/2023 15:00 8/22/2023 18:00 3.00 MIRU, MOVE RURD P Hook truck up to sub, move sub over MT7-94. Unhook truck, and jeep from sub. Stomp pipe shed into tow position. Hook up truck to pipe shed and move to MT7 94. 0.0 0.0 8/22/2023 18:00 8/22/2023 21:00 3.00 MIRU, MOVE RURD P Stomp pipe shed into sub. Pin pipe shed to sub. Shim sub and pipe shed. Spot motor complex with truck. Move pit and pump complex to the sub. 0.0 0.0 8/22/2023 21:00 8/23/2023 00:00 3.00 MIRU, MOVE RURD P Raise mast. Skid rig floor into drilling position. Spot and shim pit, and pump complexes. 0.0 0.0 8/23/2023 00:00 8/23/2023 01:30 1.50 MIRU, MOVE RURD P Set pump complex. Hook up interconnects and lower stairs. Stomp CSG complex and shim. Set pipe conveyors, and lower stairs. 0.0 0.0 8/23/2023 01:30 8/23/2023 03:00 1.50 MIRU, MOVE RURD P Stomp motor complex into place, and set stairs. Shim and set cellar. Hook-up pit and pump complex electrical lines. 0.0 0.0 8/23/2023 03:00 8/23/2023 04:00 1.00 MIRU, MOVE RURD P Hook-up pits interconnects. Lower C- section. Hook-up mud and cement lines on the rig floor. Remove energy track straps, hook-up electrical lines on the rig floor and in the pit complex. 0.0 0.0 8/23/2023 04:00 8/23/2023 06:30 2.50 MIRU, MOVE RURD P Hook-up hydraulic lines, and raise cattle -shoot. Install cattle-shoot hatches. Hook-up CSG and pipe shed complex electrical lines. Hook-up geronimo and derrick assist lines. 0.0 0.0 8/23/2023 06:30 8/23/2023 08:00 1.50 MIRU, MOVE RURD P Hook-up elecrtrical from motor to pump complexes. Begin working on rig acceptance check list. 0.0 0.0 8/23/2023 08:00 8/23/2023 09:00 1.00 MIRU, MOVE RURD P Swap from cold start gens to rig power on all complexes. Start Amphion. Spool drilling line onto the draw-works. Remove shipping pins on the top drive. Install bridal lines and scope derrick up. 0.0 0.0 8/23/2023 09:00 8/23/2023 09:30 0.50 MIRU, MOVE RURD P Lower derrick ladder. Install SRL's and pull derrick counter weight line to the rig floor. Make up kelly hose to top drive. Obtain RKB's. RKB: 38.7' to load shoulder. 39.2' to ground level. RIG ACCEPTED 09:30 ON 08/23/2023. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 2/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/23/2023 09:30 8/23/2023 12:00 2.50 MIRU, MOVE NUND P N/U surface riser. Rig down ST-80 and remove from rig floor. Start to bring on drilling mud into the pits. 0.0 0.0 8/23/2023 12:00 8/23/2023 16:00 4.00 MIRU, MOVE NUND P M/U flow line flange to riser. M/U flow line dresser sleeve. Move Joe's box in place, and seal. Install surface riser flow nipple. Air up air boots on flow line. RIG ON HIGH LINE POWER 1530 HRS ON 08/23/2023. 0.0 0.0 8/23/2023 16:00 8/23/2023 17:00 1.00 MIRU, MOVE BHAH P Bring short BHA components to the rig floor. Load long BHA components and HWDP into the pipe shed. 0.0 0.0 8/23/2023 17:00 8/23/2023 18:30 1.50 MIRU, MOVE BHAH P P/U and rack back 4 stands of HWDP. Check that 90' mouse hole is clear. 0.0 0.0 8/23/2023 18:30 8/23/2023 19:00 0.50 MIRU, MOVE CIRC P Flood lines and fill up conductor. Check for leaks. 0.0 0.0 8/23/2023 19:00 8/23/2023 20:30 1.50 MIRU, MOVE BHAH P P/U Conductor clean out BHA to 65' per Baker DD. 0.0 65.0 8/23/2023 20:30 8/23/2023 21:00 0.50 MIRU, MOVE SEQP P Test surface lines to 3500 PSI: GOOD. 65.0 65.0 8/23/2023 21:00 8/23/2023 21:15 0.25 MIRU, MOVE WASH P Wash down F/ 65' to 106'. Tag bottom @ 106'. 150 GPM @ 180 PSI. 65.0 106.0 8/23/2023 21:15 8/23/2023 22:30 1.25 SURFAC, DRILL DDRL P Drill F/ 106' to 270' leaving enough room to P/U the next BHA. 575 GPM @ 905 PSI 40 RPM @ 5 K TQ 8 K WOB. 106.0 270.0 8/23/2023 22:30 8/24/2023 00:00 1.50 SURFAC, DRILL BKRM P Back ream out of the hole F/ 270' to 65'. 575 GPM @ 700 PSI 40 RPM @ 2 K TQ ROTWT: 60 K. 270.0 65.0 8/24/2023 00:00 8/24/2023 02:45 2.75 SURFAC, DRILL BHAH P P/U surface BHA and Make up as per Baker DD. Trip in to 206' MD. Plug in and test MWD tools . 65.0 206.0 8/24/2023 02:45 8/24/2023 03:45 1.00 SURFAC, DRILL PULD P P/U stand of HWDP shallow test MWD tools and obtain survey at 206' MD , Mouse hole stand and P/U last joint of drill collars to 245' MD 206.0 245.0 8/24/2023 03:45 8/24/2023 06:00 2.25 SURFAC, DRILL DDRL P Wash in hole from 245' MD to 270' MD survey with Gyro and drill 16" surface hole section from 270' MD to 390' MD/TVD. 7k WOB 650 GPM 1205 PSI 60 RPM 4.5 k TQ on bttm 2.5 k TQ off bttm 41% FO 2.2 hrs ADT 2.2 hrs ART 2.2 hrs TBH 0 hrs TJH 245.0 390.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 3/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/24/2023 06:00 8/24/2023 12:00 6.00 SURFAC, DRILL DDRL P Drill/Slide f/ 390' to 1686' MD/ 990' TVD. 8 k WOB 850 GPM 1950 PSI 60 RPM 6k TQ on bttm 2.5k TQ off bttm 50% FO 11.4 ppg ECD 85k PUW 85k SOW 85k ROT 1.1 hrs AST 2.4 hrs ART 5.7 hrs TBH 2.1 hrs TJH 390.0 990.0 8/24/2023 12:00 8/24/2023 18:00 6.00 SURFAC, DRILL DDRL P Drill/Slide f/ 990' to 1686' MD/ 1646' TVD. 12k WOB 900 GPM 2330 PSI 60 RPM 7k TQ on bttm 3k TQ off bttm 50% FO 11.6ppg ECD 98k SO 94k ROT 2.1 hrs AST 2.3 hrs ART 4.3 hrs ADT 6.2 hrs TJH 990.0 1,646.0 8/24/2023 18:00 8/24/2023 23:30 5.50 SURFAC, DRILL DDRL P Drill/Slide f/ 1686' to 2350' MD/ 2152' TVD. 9k WOB 900 GPM 2310 PSI 60 RPM 8k TQ on bttm 4k TQ off bttm 50% FO 11.6ppg ECD 98k SO 100k ROT 2.5 hrs AST 1.6 hrs ART 4.1 hrs ADT 10.5 hrs TJH 14.1 Bit hours 1,646.0 2,350.0 8/24/2023 23:30 8/25/2023 00:00 0.50 SURFAC, DRILL SVRG P Rig service replace breaker for pipe shed power supply. 2,350.0 2,350.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 4/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/25/2023 00:00 8/25/2023 03:00 3.00 SURFAC, DRILL DDRL P Drill/Slide f/ 2350' to 2700' MD/ 2367' TVD. 9k WOB 900 GPM 2310 PSI 60 RPM 8k TQ on bttm 4k TQ off bttm 50% FO 11.6ppg ECD 98k SO 100k ROT 2.5 hrs AST 1.6 hrs ART 4.1 hrs ADT 10.5 hrs TJH 14.1 Bit hours 2,350.0 2,700.0 8/25/2023 03:00 8/25/2023 04:00 1.00 SURFAC, DRILL DDRL T Trouble shoot MWD signal loss, try different pump rates and several cycles. Pump 10 bbl sweep fresh water to try and clear tools. 2,700.0 2,700.0 8/25/2023 04:00 8/25/2023 05:15 1.25 SURFAC, DRILL CIRC T Unable to regain comms with MWD. Rack back a stand and cycle pumps from 800 to 1000 GPM attempting to establish connection. Pump 10 bbl water sweep to try and clear tools of potential debris. Unable to regain connectivity with MWD. 2,700.0 2,700.0 8/25/2023 05:15 8/25/2023 12:00 6.75 SURFAC, DRILL BKRM T BROOH from 2686' MD to 578' MD 900 GPM 2150 PSI 40 RPM 5k TQ 49% flow out 80k ROT 2,700.0 2,700.0 8/25/2023 12:00 8/25/2023 12:15 0.25 SURFAC, DRILL CIRC T Pump 80 bbl sweep and observe increae of large cuttings. 2,700.0 2,700.0 8/25/2023 12:15 8/25/2023 12:30 0.25 SURFAC, DRILL OWFF T Open well flow check and observe minor losses 2,700.0 2,700.0 8/25/2023 12:30 8/25/2023 13:00 0.50 SURFAC, DRILL TRIP T POOH from 578' MD to 242' MD racking back stands of HWDP. 2,700.0 2,700.0 8/25/2023 13:00 8/25/2023 14:30 1.50 SURFAC, DRILL BHAH T L/D BHA from 242' MD to 0' as per Baker DD 2,700.0 2,700.0 8/25/2023 14:30 8/25/2023 16:00 1.50 SURFAC, DRILL BHAH T P/u and M/U 16" BHA #2 as per Baker DD/MWD scribe, Plug in tools and test tools. 242' MD. 2,700.0 2,700.0 8/25/2023 16:00 8/25/2023 17:30 1.50 SURFAC, DRILL TRIP T Trip in hole from 242' MD to 2670' MD 89k SO 2,700.0 2,700.0 8/25/2023 17:30 8/25/2023 18:00 0.50 SURFAC, DRILL REAM T Wash in hole from 2670' MD to 2700' MD 900 GPM 2550 PSI 60 RPM 4k TQ 2,700.0 2,700.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 5/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/25/2023 18:00 8/25/2023 23:15 5.25 SURFAC, DRILL DDRL P Drill/Slide f/ 2700' to 3264' MD/ 2644' TVD. 23k WOB 900 GPM 3020 PSI 60 RPM 10k TQ on bttm 49% FO 11.8ppg ECD 106k ROT 1.4 hrs AST 3.3 hrs ART 4.7 hrs ADT 18.09 hrs TJH 21.69 Bit hours 2,700.0 3,264.0 8/25/2023 23:15 8/26/2023 00:00 0.75 SURFAC, DRILL DDRL T Plugged flowbox from hole unloading after sliding. 3,264.0 3,264.0 8/26/2023 00:00 8/26/2023 05:00 5.00 SURFAC, DRILL DDRL P Drill/Slide f/ 3264' to 3726' MD/ 2861' TVD. 28k WOB 900 GPM 3060 PSI 60 RPM 11k TQ on bttm 6k TQ off Bttm 65% FO 12.1ppg ECD 110k ROT 3,264.0 3,726.0 8/26/2023 05:00 8/26/2023 05:30 0.50 SURFAC, DRILL DDRL T Hole unloaded and plugged flowbox. Shut down pull master bushings and clean out Joes box. 3,726.0 3,726.0 8/26/2023 05:30 8/26/2023 08:30 3.00 SURFAC, DRILL DDRL P Drill/Slide f/ 3726' to 4020' MD/ 2997' TVD. 35k WOB 900 GPM 2960 PSI 60 RPM 11k TQ on bttm 6k TQ off Bttm 68% FO 12.2ppg ECD 110k ROT 3,726.0 4,020.0 8/26/2023 08:30 8/26/2023 09:45 1.25 SURFAC, DRILL CIRC T Observed sudden increase uin ECD from 11.8 ppg to 12.2 ppg, Picked up off bottm and work pipe, pull master bushings and work pipe until hole cleans up. 4,020.0 4,020.0 8/26/2023 09:45 8/26/2023 10:30 0.75 SURFAC, DRILL DDRL P Drill/Slide f/ 4020' to 4096' MD/ 3022' TVD. TD called at 4096' 28k WOB 900 GPM 3215 PSI 60 RPM 11k TQ on bttm 7k TQ off Bttm 68% FO 11.6 ppg ECD 110k ROT 4,020.0 4,096.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 6/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/26/2023 10:30 8/26/2023 13:00 2.50 SURFAC, TRIPCAS CIRC P Take final survey, pump 40 bbl HIVIS sweep. Minimal increase in cuttings from sweep. 900 GPM 3215 PSI 60 RPM 11k TQ on bttm 7k TQ off Bttm 68% FO 11.6 ppg ECD 4,096.0 4,096.0 8/26/2023 13:00 8/26/2023 13:15 0.25 SURFAC, TRIPCAS OWFF P Open well flow check , slight losses observed. 4,096.0 4,096.0 8/26/2023 13:15 8/26/2023 18:00 4.75 SURFAC, TRIPCAS BKRM P Backream out of hole from 3893' MD to 2586' MD. 900 GPM 2700 PSI 40 RPM 5k TQ 4,096.0 4,096.0 8/26/2023 18:00 8/27/2023 00:00 6.00 SURFAC, TRIPCAS BKRM P Backream out of hole from 2586' MD to 807' MD. 900 GPM 2200 PSI 40 RPM Slow pump rate at 1000' MD to 750 GPM. 750 GPM 1700 PSI 4,096.0 4,096.0 8/27/2023 00:00 8/27/2023 00:45 0.75 SURFAC, TRIPCAS BKRM P Back rem from 807' MD to 784' 750 GPM 40 RPM 4,096.0 4,096.0 8/27/2023 00:45 8/27/2023 01:45 1.00 SURFAC, TRIPCAS CIRC P Pump 40 bbl HiVis sweep on last stand of drill pipe and Back ream until sweep is out, moderate increase in cuttings from sweep. Rack back stand and pump second 40 bbl HiVis sweep on first stand of HWDP and Backream while circulating out sweep Heavy increase in cuttings observed fro second sweep. 4,096.0 4,096.0 8/27/2023 01:45 8/27/2023 02:00 0.25 SURFAC, TRIPCAS OWFF P Flow check well for 15 minutes, well static. 4,096.0 4,096.0 8/27/2023 02:00 8/27/2023 05:00 3.00 SURFAC, TRIPCAS BHAH P Rack back HWDP and L/D BHA as per Baker DD. 4,096.0 4,096.0 8/27/2023 05:00 8/27/2023 06:00 1.00 SURFAC, CASING BHAH P Clean and clear rig floor remove BHA components 4,096.0 4,096.0 8/27/2023 06:00 8/27/2023 07:00 1.00 SURFAC, CASING RURD P R/U Volant , power tongs, Bail extensions, Elevators and Spiders. 4,096.0 4,096.0 8/27/2023 07:00 8/27/2023 07:30 0.50 SURFAC, CASING PUTB P M/U 13-3/8" Shoe track Backer Lock pins through joint #4. Pump through shoe track to check floats. 4,096.0 4,096.0 8/27/2023 07:30 8/27/2023 10:00 2.50 SURFAC, CASING PUTB P Run in hole with 13-3/8" Surface casing as per modeled trip speeds. to 1037' MD 30K M/U TQ 98k SOW 4,096.0 4,096.0 8/27/2023 10:00 8/27/2023 10:30 0.50 SURFAC, CASING CIRC P Circulate bottoms up at 1037' MD stagging pumps up to 8 BPM. 148 PSI 21% FO 4,096.0 4,096.0 8/27/2023 10:30 8/27/2023 12:00 1.50 SURFAC, CASING PUTB P Run in hole with 13-3/8" surface casing from 1037' MD to 1764' MD as per modeled tripping speeds. Install Centek centralizers as per tally. 30K M/U TQ 130k SOW 4,096.0 4,096.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 7/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/27/2023 12:00 8/27/2023 18:30 6.50 SURFAC, CASING PUTB P Run in hole with 13-3/8" surface casing from 1764' MD to 4043' MD as per modeled tripping speeds. Install centralizers Centek centralizers as per tally. 32K M/U TQ 172k SOW 4,096.0 4,096.0 8/27/2023 18:30 8/27/2023 19:00 0.50 SURFAC, CASING PUTB P 4043' MD M/U hanger and RIH to 4085' 4,096.0 4,096.0 8/27/2023 19:00 8/27/2023 20:00 1.00 SURFAC, CASING CIRC P 4085' MD Stage up pumps to 8 BPM and CBU FCP at 8 BPM 241 PSI PUW 226k SOW 176k 4,096.0 4,096.0 8/27/2023 20:00 8/27/2023 20:30 0.50 SURFAC, CASING RURD P Blow down top drive rig up cement hose to Volant break circulation at 4 BPM, simps PJSM for cement job. 4,096.0 4,096.0 8/27/2023 20:30 8/28/2023 00:00 3.50 SURFAC, CEMENT CMNT P Line up to SLB cement unit pressure test lines to 4500 psi. Pump 103 bbl's mudpush2, FCP at 4.8 BPM 292 psi. Spot 2 gallons of red dye and drop bottom plug. Pump 461 bbl's of 11 ppg DeepCrete cmt FCP at 5 BPM 803 psi. Pump 73 bbl's 15.8 ppg class G tail cmt at 5 BPM, 510 FCP at 4.1 BPM. Drop top plug and chase with 20 bbl's water from cement unit and line up on mud pump and pump 1560 strokes observe bottom plug land at 576 stokes shear at 374 psi. 4,096.0 4,096.0 8/28/2023 00:00 8/28/2023 01:30 1.50 SURFAC, CEMENT CMNT P Continue displacing cement with rig mud pumps at 8 BPM Observed cement back to surface at 3600 strokes. Reduced rate to 3 BPM, 480 PSI at 4800 strokes, Bump plugs at 4930 strokes and pressure up to 900 PSI 500 psi over FCP. Hold for 5 minutes. Bleed off pressure and check flow for floats holding, floats good. Drain riser and flush with black water. 198 Cement returns. 4,096.0 4,096.0 8/28/2023 01:30 8/28/2023 02:30 1.00 SURFAC, CEMENT PRTS P Pressure test surface casing to 3500 psi for 30 minutes charted , record bleed off on LOT chart. 4,096.0 4,096.0 8/28/2023 02:30 8/28/2023 04:00 1.50 SURFAC, CEMENT RURD P Back out landing joint , set slips and R/D Volant and L/D landing joint. Flush riser. Clean cement line, Demco's and Joes Box. Blow down hole fill and jet lines. 4,096.0 4,096.0 8/28/2023 04:00 8/28/2023 06:00 2.00 SURFAC, WHDBOP RURD P Nipple down riser and surface equipment. 4,096.0 4,096.0 8/28/2023 06:00 8/28/2023 07:00 1.00 SURFAC, WHDBOP NUND P Nipple upWell head and orientate as per Pad operator. test lower seal to 1000 PSi as per FMC rep. 4,096.0 4,096.0 8/28/2023 07:00 8/28/2023 11:30 4.50 SURFAC, WHDBOP NUND P Nipple up BOPS, Riser Flowline, RCD clamp, Choke and kill lines. Obtain RKB measurements set mouse hole and mobilize BHA components to the rig floor. 4,096.0 4,096.0 8/28/2023 11:30 8/28/2023 12:00 0.50 SURFAC, WHDBOP MPSP P Set test plug, fill BOPS with H2O, set RCD test cap and purge system of air. 4,096.0 4,096.0 8/28/2023 12:00 8/28/2023 13:00 1.00 SURFAC, WHDBOP RURD P TQ Riser bolts 4,096.0 4,096.0 8/28/2023 13:00 8/28/2023 14:15 1.25 SURFAC, WHDBOP MPDA P Pressure test RCD to 250 low psi and 1800 high psi for 5/10 minutes, rig down and pull test cap. 4,096.0 4,096.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 8/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/28/2023 14:15 8/28/2023 15:15 1.00 SURFAC, WHDBOP RURD P P/U 9.625 test joint and R/U BOP testing equipment. Flood lines with H2O and purge air. 4,096.0 4,096.0 8/28/2023 15:15 8/28/2023 22:30 7.25 SURFAC, WHDBOP BOPE P Test BOPE all test T/ 250 low for 5 min and 5,000 high for 10 min charted. W/ exception of annular T/ 250 low for 5 min and 3,500 high for 10 min. Manual operated & super choke tested T/2,000 psi charted, W/ 9-5/8" test JT test annular, 9-5/8" UPR, Test choke valves 1-15, manual operated & super choke, Choke & kill manuals, HCR's, 4" valves on kill line, 5" FOSV, 5" Dart valve, Upper and lower IBOP on TD; Blind/shear rams; Perform KOOMEY drawdown, ACC = 3050 PSI. MANIF. = 1500 PSI. ACC = 1650 PSI After all functions on bottles, 14 sec for 200 psi. Build W/ 2 Elec. pumps, 97 sec T/ Build full system. Pressure W/ 2 Elec. & 2 Air pumps, Closing times, Annular = 27 sec. UPR = 14 sec. Blind / Shears = 15 sec. LPR = 14 sec. Choke HCR = 2 sec. Kill HCR = 2 sec; Test PVT G/L and flow out alarms, Test LEL and H2S alarms. AOGCC and BLM witness waived. 4,096.0 4,096.0 8/28/2023 22:30 8/28/2023 23:00 0.50 SURFAC, WHDBOP RURD P Blow down and rig down test equipment. 4,096.0 4,096.0 8/28/2023 23:00 8/29/2023 00:00 1.00 SURFAC, DRILLOUT SLPC P Hang off blocks and Slip and cut drilling line. replace spool. 4,096.0 4,096.0 8/29/2023 00:00 8/29/2023 02:30 2.50 SURFAC, DRILLOUT SLPC P Hang off blocks and Slip and cut drilling line. replace spool. 4,096.0 4,096.0 8/29/2023 02:30 8/29/2023 03:00 0.50 SURFAC, DRILLOUT RURD P Install wear ring as per FMC rep. 4,096.0 4,096.0 8/29/2023 03:00 8/29/2023 08:15 5.25 SURFAC, DRILLOUT BHAH P PJSM and P/U and M/U 12-1/4" INT 1 BHA as per Baker DD. 4,096.0 4,096.0 8/29/2023 08:15 8/29/2023 11:15 3.00 SURFAC, DRILLOUT TRIP P Run in hole to 3788' MD with 12-1/4" INT #1 BHA with stands of drill pipe from derrick. Monitor displacement on pit #7 Shallow test MWD at 2500' MD with 770 GPM 3500 PSI. 4,096.0 4,096.0 8/29/2023 11:15 8/29/2023 11:45 0.50 SURFAC, DRILLOUT SFTY P Fill pipe , space out and shut in well for choke drill. 4,096.0 4,096.0 8/29/2023 11:45 8/29/2023 13:45 2.00 SURFAC, DRILLOUT COCF P Wash in hole fro 3611' MD to 3981' 126 GPM 189 PSI Drill cement stringers from to 3993' MD 3993'MD tag FC 4,096.0 4,096.0 8/29/2023 13:45 8/29/2023 17:30 3.75 SURFAC, DRILLOUT DRLG P 3993' MD drill plugs, FC and Shoe track to 4085' MD wash down to 4096' 640 GPM 1460 PSI 50-80 RPM 10 to 16K TQ 4,096.0 4,096.0 8/29/2023 17:30 8/29/2023 18:00 0.50 SURFAC, DRILLOUT DDRL P Drill ahead from 4096 to 4116' for 20' new formation to FIT test depth. 640 GPM 1430 PSI 10-13K TQ 4,096.0 4,116.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 9/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/29/2023 18:00 8/29/2023 19:00 1.00 SURFAC, DRILLOUT CIRC P 4116' MD circulate and condition mud for FIT test. 640 GPM 1430 PSI 60 RPM 10-13k TQ 4,116.0 4,116.0 8/29/2023 19:00 8/29/2023 19:30 0.50 SURFAC, DRILLOUT FIT P Pull back into casing shoe RB stand and R/U for FIT test flood lines and perform FIT test with 10.9 ppg MDWT and 759 PSI for a 15.7 ppg EQV. 3.2 bbl's pumped and 3.0 bbl's bled back. 4,116.0 4,116.0 8/29/2023 19:30 8/30/2023 00:00 4.50 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 4116' MD to 4155'' MD , make connection and resume drilling ahead from 4155' MD to 4446' MD 3179' TVD while displacing mud to 11.0 ppg FWP. Finish displacement before connection is made and continue drilling ahead down linking as needed. 1048 GPM 2333 PSI 140 RPM 15k WOB 15k TQ on bttm 10k TQ off Bttm 54% FO 11.8 ppg ECD 140k PUW 104 SOW 119k RTW ADT 2.8 Bit hours 3.25 Jar hours 31.1 4,116.0 4,446.0 8/30/2023 00:00 8/30/2023 06:00 6.00 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 4446' MD to 4998' MD 1040 GPM 2470 PSI 150 RPM 16k WOB 10k TQ on bttm 6k TQ off Bttm 55% FO 11.9 ppg ECD 140k PUW 110 SOW 126k RTW ADT 4.1 Bit hours 4.1 Jar hours 35.2 4,446.0 4,998.0 8/30/2023 06:00 8/30/2023 12:00 6.00 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 4998' MD to 5684' MD 1040 GPM 2790 PSI 150 RPM 16k WOB 11k TQ on bttm 6k TQ off Bttm 55% FO 12.2 ppg ECD 146k PUW 118 SOW 131k RTW ADT 4.4 Bit hours 11.8 Jars 35.6 4,998.0 5,684.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 10/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/30/2023 12:00 8/30/2023 18:00 6.00 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 5684' MD to 6436' MD 4096 TVD 1040 GPM 3060 PSI 150 RPM 22k WOB 12k TQ on bttm 8k TQ off Bttm 57% FO 12.4 ppg ECD 160k PUW 121 SOW 137k RTW ADT 4.4 Bit hours 16.2 Jars 44 Note: At 5900' suspend NOVOS T&D due to inability to properly configure settings. Rotary randomly turning on at 120rpm while slacking off. 5,684.0 6,436.0 8/30/2023 18:00 8/31/2023 00:00 6.00 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 6436' MD to 7262' MD 4477' TVD 1040 GPM 3400 PSI 150 RPM 20k WOB 13k TQ on bttm 10k TQ off Bttm 57% FO 12.8 ppg ECD 165k PUW 123 SOW 143k RTW ADT 4.5 Bit hours 20.7 Jars 48.5 6,436.0 7,262.0 8/31/2023 00:00 8/31/2023 06:30 6.50 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 7262' MD to 8002' MD 4810' TVD 1040 GPM 3546 PSI 150 RPM 20k WOB 15k TQ on bttm 8k TQ off Bttm 55% FO 12.9 ppg ECD 183k PUW 128 SOW 145k RTW ADT 4.3 Bit hours 25.1 Jars 52.9 7,262.0 8,002.0 8/31/2023 06:30 8/31/2023 07:30 1.00 INTRM1, DRILL CIRC P Pomp 50 bbl LowVis nut plug sweep circulate and reciprocate. 1040 GPM 3600 PSI 11k TQ on bttm 6k TQ off Bttm 55% FO 12.7 ppg ECD 183k PUW 128 SOW 145k RTW 8,002.0 8,002.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 11/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 8/31/2023 07:30 8/31/2023 12:00 4.50 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 8002' MD to 8510' MD 5051' TVD 1040 GPM 3710 PSI 150 RPM 16k WOB 16k TQ on bttm 9k TQ off Bttm 55% FO 12.9 ppg ECD 183k PUW 128 SOW 145k RTW ADT 3.5 Bit hours 28.6 Jars 56.4 8,002.0 8,510.0 8/31/2023 12:00 8/31/2023 18:00 6.00 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 8510' MD to 8781' MD 1040 GPM 3440 PSI 120 RPM 12k WOB 16k TQ on bttm 9k TQ off Bttm 58% FO 12.4 ppg ECD 184k PUW 137 SOW 154k RTW ADT 5.5 Bit hours 34.1 Jars 61.9 8,510.0 8,781.0 8/31/2023 18:00 9/1/2023 00:00 6.00 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 8510' MD to 9047' MD 5298' TVD, Increased gas at 8873' MD 5219' TVD 1040 GPM 3400 PSI 120 RPM 14k WOB 13k TQ on bttm 7k TQ off Bttm 58% FO 12.2 ppg ECD 184k PUW 137 SOW 154k RTW ADT 5.3 Bit hours 39.1 Jars 67.9 Gas units peak 182 8,781.0 9,047.0 9/1/2023 00:00 9/1/2023 06:00 6.00 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 9047' MD to 9300' MD 5416' TVD, Increased gas at 8873' MD 5219' TVD 1040 GPM 3712 PSI 120 RPM 18k WOB 15k TQ on bttm 9k TQ off Bttm 58% FO 12.1 ppg ECD 190k PUW 140 SOW 159k RTW ADT 5.2 Bit hours 44.6 Jars 72.4 Gas units peak 167 9,047.0 9,300.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 12/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/1/2023 06:00 9/1/2023 09:15 3.25 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 9300' MD to 9554' MD 5486' TVD, 1040 GPM 3500 PSI 120 RPM 18k WOB 15k TQ on bttm 9k TQ off Bttm 58% FO 12.1 ppg ECD 184k PUW 137 SOW 155k RTW 9,300.0 9,454.0 9/1/2023 09:15 9/1/2023 09:45 0.50 INTRM1, DRILL SVRG P Rig service, replace pin connection on mud pump #2 9,454.0 9,454.0 9/1/2023 09:45 9/1/2023 10:30 0.75 INTRM1, DRILL CIRC T Continue replacing pin connector on mud pump#2 9,454.0 9,454.0 9/1/2023 10:30 9/1/2023 12:00 1.50 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 9454' MD to 9514' MD 5514' TVD, 1040 GPM 3700 PSI 120 RPM 25k WOB 15k TQ on bttm 11k TQ off Bttm 58% FO 12.1 ppg ECD 184k PUW 137 SOW 155k RTW ADT 4.3 Bit hours 48.9 Jars 76.7 9,454.0 9,514.0 9/1/2023 12:00 9/1/2023 16:00 4.00 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 9514' MD to 9679' MD 5589' TVD, 1040 GPM 3730 PSI 120 RPM 25k WOB 15k TQ on bttm 11k TQ off Bttm 58% FO 12.1 ppg ECD 184k PUW 137 SOW 155k RTW ADT 3.4 Bit hours 52.3 Jars 80.1 9,514.0 9,679.0 9/1/2023 16:00 9/1/2023 17:00 1.00 INTRM1, DRILL CIRC T Circullate and condition while replace gasket on mud pump #2 500 GPM 1190 PSI 100 RPM 10K TQ 9,679.0 9,679.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 13/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/1/2023 17:00 9/2/2023 00:00 7.00 INTRM1, DRILL DRLG P Drill 12-1/4" hole from 9679' MD to 9979' MD 5727' TVD, 1040 GPM 3750 PSI 120 RPM 25k WOB 17k TQ on bttm 11k TQ off Bttm 58% FO 12.1 ppg ECD 184k PUW 137 SOW 155k RTW ADT 6 Bit hours 58.3 Jars 86.1 9,679.0 9,979.0 9/2/2023 00:00 9/2/2023 06:00 6.00 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 9979' MD to 10,238' MD ' 5846 TVD, 1025 GPM 3750 PSI 120 RPM 25k WOB 17k TQ on bttm 11k TQ off Bttm 58% FO 12.1 ppg ECD 208k PUW 150 SOW 170k RTW ADT 5.4 Bit hours 68.4 Jars 91.3 9,979.0 10,230.0 9/2/2023 06:00 9/2/2023 12:00 6.00 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 10238' MD to 10,585' MD ' 6,006' TVD, 1025 GPM 3675 PSI 140 RPM 22k WOB 18k TQ on bttm 14k TQ off Bttm 58% FO 12.0 ppg ECD 220k PUW 150 SOW 170k RTW ADT 4.9 Bit hours 68.4 Jars 96.2 10,230.0 10,585.0 9/2/2023 12:00 9/2/2023 16:00 4.00 INTRM1, DRILL DDRL P Drill 12-1/4" hole from 10585' MD to 10,930' MD ' 6,165' TVD, 1020 GPM 3620 PSI 140 RPM 22k WOB 19k TQ on bttm 14k TQ off Bttm 58% FO 12.0 ppg ECD 220k PUW 150 SOW 170k RTW ADT 4.9 Bit hours 68.4 Jars 96.2 10,585.0 10,930.0 9/2/2023 16:00 9/2/2023 19:30 3.50 INTRM1, DRILL CIRC P Circulate bottoms up racking back pne stand per bottoms up. from 10,930' MD to 10,684' MD. 10,930.0 10,930.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 14/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/2/2023 19:30 9/2/2023 20:00 0.50 INTRM1, DRILL OWFF P Conduct 30 minute flow check well,observe alight drop in fluid level. 10,930.0 10,930.0 9/2/2023 20:00 9/3/2023 00:00 4.00 INTRM1, DRILL BKRM P Back ream out of hole from 10,684' MD to 10,215' MD 1000 GPM 3410 PSI 120 RPM 18k TQ 58% FO 11.9 ppg ECD 165k RTW 10,930.0 10,930.0 9/3/2023 00:00 9/3/2023 06:00 6.00 INTRM1, DRILL BKRM P Back ream out of hole from 10,215' MD to 9100' MD Pumping sweeps and adding dilution fluid as needed to maintain mud properties. 1000 GPM 3340 PSI 120 RPM 14k TQ 58% FO 11.9 ppg ECD 152k RTW 10,930.0 10,930.0 9/3/2023 06:00 9/3/2023 12:00 6.00 INTRM1, DRILL BKRM P Back ream out of hole from 9,100' MD to 7,675' MD, Pumping sweeps and adding dilution fluid as needed to maintain mud properties. 1000 GPM 3108 PSI 120 RPM 11k TQ 58% FO 12.2 ppg ECD 140k RTW 10,930.0 10,930.0 9/3/2023 12:00 9/3/2023 18:00 6.00 INTRM1, DRILL BKRM P Back ream out of hole from 9,100' MD to 7,675' MD, Pumping sweeps and adding dilution fluid as needed to maintain mud properties. 1000 GPM 3108 PSI 120 RPM 11k TQ 58% FO 12.2 ppg ECD 140k RTW 10,930.0 10,930.0 9/3/2023 18:00 9/4/2023 00:00 6.00 INTRM1, DRILL BKRM P Back ream out of hole from 7,675' MD to 5688' MD, Pumping sweeps and adding dilution fluid as needed to maintain mud properties. Tight spots encountered at 7400' to 5780'. 1000 GPM 2724 PSI 120 RPM 12k TQ 56% FO 12.0 ppg ECD 125k RTW 10,930.0 10,930.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 15/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/4/2023 00:00 9/4/2023 06:00 6.00 INTRM1, DRILL BKRM P Back ream out of hole from 5,688' MD to 4774' MD, Pumping sweeps and adding dilution fluid as needed to maintain mud properties. Tight spots encountered at 7400' to 4774'. 1000 GPM 2724 PSI 120 RPM 12k TQ 56% FO 12.0 ppg ECD 125k RTW 5,688.0 4,774.0 9/4/2023 06:00 9/4/2023 10:00 4.00 INTRM1, DRILL BKRM P Back ream out of hole from 4774' MD to 4080' MD, Pumping sweeps and adding dilution fluid as needed to maintain mud properties. Tight spots encountered up to 4500'. 4450' MD Perform 540 bbl dilution. 1000 GPM 2500 PSI 120 RPM 12k TQ 56% FO 11.8 ppg ECD 116k RTW 4,774.0 4,080.0 9/4/2023 10:00 9/4/2023 11:15 1.25 INTRM1, DRILL CIRC P Pump 40 bbl LoVis and 40 bbl HiVis sweep Nut plug sweep Large increase in cuttings from sweeps. 1000 GPM 2230 PSI 60 RPM 7K TQ 55% FO RTW 120K 4,080.0 4,080.0 9/4/2023 11:15 9/4/2023 12:00 0.75 INTRM1, DRILL TRIP P Trip in hole from 4080' to 5027' MD. 112K SOW 132K PUW 4,080.0 5,027.0 9/4/2023 12:00 9/4/2023 16:00 4.00 INTRM1, DRILL TRIP P Trip in hole from 5027' to 9833' MD. 112K SOW 132K PUW 5,027.0 9,833.0 9/4/2023 16:00 9/4/2023 19:30 3.50 INTRM1, DRILL CIRC P Circulate bottoms up X3 and pump 40 bbl LoVis and 40 bbl HiVis sweeps to clean hole and pump 550 bbl dilution. 1000 GPM 3071 PSI 120 RPM 16K TQ 11.60 ECD PUW 200k SOW 147k RTW 165k 9,833.0 9,833.0 9/4/2023 19:30 9/4/2023 20:00 0.50 INTRM1, DRILL OWFF P Perform flow check well, Observe slight drop in fluid level. 9,833.0 9,833.0 9/4/2023 20:00 9/5/2023 00:00 4.00 INTRM1, DRILL TRIP P Trip out of hole fro 9833' MD to 5700' MD with 12-1/4" BHA while monitor displacement on Pit #2. 150k PUW 9,833.0 5,700.0 9/5/2023 00:00 9/5/2023 01:30 1.50 INTRM1, DRILL TRIP P Trip out of hole fro 5700' MD to 4080' MD with 12-1/4" BHA while monitor displacement on Pit #2 150k PUW 5,700.0 4,080.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 16/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/5/2023 01:30 9/5/2023 03:00 1.50 INTRM1, DRILL CIRC P Pump HiVis Low Vis sweep 40 bbl each. Circulate 2 x bottoms up inside casing pump HiVis Low Vis sweep 40 bbl each. 1000 GPM 2278 PSI 11.7 ECD 30 RPM 7k TQ 110k RTW Pump dry job 4,080.0 4,080.0 9/5/2023 03:00 9/5/2023 03:15 0.25 INTRM1, DRILL OWFF P Perform flow check well, Observe slight drop in fluid level. 4,080.0 4,080.0 9/5/2023 03:15 9/5/2023 04:30 1.25 INTRM1, DRILL TRIP P Trip out of hole from 4080' MD to 2798' MD with 12-1/4" BHA while monitor displacement on Pit #2 120k PUW 4,080.0 2,798.0 9/5/2023 04:30 9/5/2023 04:45 0.25 INTRM1, DRILL SVRG P Replace tong dies on ST-80's 2,798.0 2,798.0 9/5/2023 04:45 9/5/2023 06:30 1.75 INTRM1, DRILL TRIP P Trip out of hole from 2798' MD to 690' MD with 12-1/4" BHA while monitor displacement on Pit #2 2,798.0 690.0 9/5/2023 06:30 9/5/2023 07:00 0.50 INTRM1, DRILL OWFF P Perform 15 minute flow check, observe slight drop in fluid level. 690.0 690.0 9/5/2023 07:00 9/5/2023 12:00 5.00 INTRM1, DRILL BHAH P Rack back HWDP, Jars and collars. L/D BHA as per Baker Rep. Download MWD, M/U filter float subs and DC and rack back in derrick. 690.0 0.0 9/5/2023 12:00 9/5/2023 15:30 3.50 INTRM1, EVALFM DLOG P Set up and test E-line tools in pipe shed, Simops shuffle pipe in derrick and clean and clear rig floor. 0.0 0.0 9/5/2023 15:30 9/5/2023 17:00 1.50 INTRM1, EVALFM DLOG P M/U E-line BHA and RIH to 161' MD and test tools as per SLB procedure. 0.0 161.0 9/5/2023 17:00 9/5/2023 20:30 3.50 INTRM1, EVALFM DLOG P RIH with MDT tools from 161' MD to 3917' MD on drill pipe from derrick. Fill pipe every 10 stands. 161.0 3,917.0 9/5/2023 20:30 9/5/2023 21:00 0.50 INTRM1, EVALFM DLOG P Hang E-line shives in derrick and rope socket side entry sub. 3,917.0 3,917.0 9/5/2023 21:00 9/6/2023 00:00 3.00 INTRM1, EVALFM DLOG P RIH with MDT tools from 3917' MD to 5800' MD on drill pipe from derrick. Fill pipe every 10 stands. 120k PUW 108K SOW 3,917.0 5,800.0 9/6/2023 00:00 9/6/2023 03:00 3.00 INTRM1, EVALFM DLOG P RIH with MDT tools from 5800' MD to 7500' MD on drill pipe from derrick. Fill pipe every 10 stands. 136k PUW 115K SOW 5,800.0 7,500.0 9/6/2023 03:00 9/6/2023 05:30 2.50 INTRM1, EVALFM DLOG P P/U CSES sub above floor and R/U lower sheave on rig floor, Stab PWCH into drill pipe. RIH 20' below mud line and run E-line in hole 300' above DWCH, latch. Pump E-line cable into latch at 4 BPM, verify latch and continuity with BHA. P/U side entry to rig floor and install cable clamp and cover. Perform additional tool check and pull test to 2.5K. 7,500.0 7,500.0 9/6/2023 05:30 9/6/2023 07:30 2.00 INTRM1, EVALFM DLOG P RIH with E-line latched in the DWCH with drill pipe at 20 FPM. 7,500.0 8,864.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 17/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/6/2023 07:30 9/6/2023 12:00 4.50 INTRM1, EVALFM DLOG P Perform stick test at 5 and 10 minute intervals, 125K SOW, 160k PUW. Space out at 8863' MD and begin pressure sampling at 8845' MD to 8955' MD as per SLB E-line rep. 126K SOW and 188K PUW. Monitor well on trip tank. 8,864.0 8,955.0 9/6/2023 12:00 9/6/2023 18:00 6.00 INTRM1, EVALFM DLOG P Continue pressure sampling from 8845' MD to 9019' MD as per SLB E-line rep. 8,955.0 9,019.0 9/6/2023 18:00 9/7/2023 00:00 6.00 INTRM1, EVALFM DLOG P Set tooll at 9019' MD and inflate packer for wellbore sampling. Conduct formation evaluation as per engineering team. 9,019.0 9,019.0 9/7/2023 00:00 9/7/2023 01:00 1.00 INTRM1, EVALFM DLOG P Set SLB MDT dual packer tool at 9019' and inflate packer for wellbore sampling. Conduct formation evaluation as per engineering team. 9,019.0 9,019.0 9/7/2023 01:00 9/7/2023 01:15 0.25 INTRM1, EVALFM DLOG P Release packer and stroke pipe 90' Break over at 257K PUW and stabilize at 159K PUW 127K SOW 9,019.0 9,019.0 9/7/2023 01:15 9/7/2023 10:30 9.25 INTRM1, EVALFM DLOG P Set SLB MDT dual packer tool at 9019' and inflate packer for wellbore sampling (5.2 gallons formation fluid pumped into wellbore). Release MDT packers. Conduct formation evaluation as per engineering team. 9,019.0 9,019.0 9/7/2023 10:30 9/7/2023 11:15 0.75 INTRM1, EVALFM DLOG P P/U 30' confirming pipe free. 286K to breakover, 165K P/U, 124K S/O. RIH f/9,019' t/9,482'. 9,019.0 9,482.0 9/7/2023 11:15 9/7/2023 15:00 3.75 INTRM1, EVALFM CIRC P Circulate bottoms up and reciprocate string. 146 units max gas. 300 GPM 700-800 PSI 165K P/U 130K S/O 9,482.0 9,482.0 9/7/2023 15:00 9/7/2023 17:00 2.00 INTRM1, EVALFM TRIP P POOH f/9,482' t/7,512' with SLB MDT to CSES. 148K P/U 9,482.0 7,512.0 9/7/2023 17:00 9/7/2023 18:30 1.50 INTRM1, EVALFM DLOG P Disconnect PWCH from DWCH applying 3,000 lbs pull above line weight, released after 9 minutes. POOH with cable to surface. Remove CSES as per SLB. 7,512.0 7,512.0 9/7/2023 18:30 9/7/2023 20:30 2.00 INTRM1, EVALFM TRIP X POOH f/7,512' t/5,535' with SLB MDT to reposition CSES for additional logging in Albain 95 sand. 148K P/U 7,512.0 5,535.0 9/7/2023 20:30 9/7/2023 21:00 0.50 INTRM1, EVALFM CIRC X Circulate drill string volume to clear DWCH w/160 gpm at 210 psi. 5,535.0 5,535.0 9/7/2023 21:00 9/7/2023 22:30 1.50 INTRM1, EVALFM DLOG X Install CSES with PWCH on cable, lowered CSES below rotary and RIH with cable to 5,100'. Pump down PWCH to latch depth at 160 gpm with 220 psi. Confirmed tool checks - good latch. P/U and tighten pack off on CSES, install clamp and pull test 3,000 lbs pull - good. Set depth and confirm with SLB unit. 5,535.0 5,535.0 9/7/2023 22:30 9/7/2023 23:30 1.00 INTRM1, EVALFM TRIP X RIH f/5,535' t/6,169' w/stands from derrick for log correlation. 123k P/U 105K S/O 5,535.0 6,169.0 9/7/2023 23:30 9/8/2023 00:00 0.50 INTRM1, EVALFM DLOG X Taking pre-tests in Albain 95 formation with SLB MDT tool as per SLB/COPA. First pre-test in progress at 6,169' DPM. 6,169.0 6,169.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 18/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/8/2023 00:00 9/8/2023 02:45 2.75 INTRM1, EVALFM DLOG X Performed 9 pre-tests in Albain 95 formation with SLB MDT tool as per SLB/COPA f/6,169' t/6,206' DPM. 6,169.0 6,206.0 9/8/2023 02:45 9/8/2023 10:00 7.25 INTRM1, EVALFM DLOG X Set MDT Dual Packer at 6,206' DPM and obtain formation sample. 7 hrs packers inflated on wall. 6,206.0 6,206.0 9/8/2023 10:00 9/8/2023 10:30 0.50 INTRM1, EVALFM DLOG X Deflate MDT Dual Packers. P/U 260K to break over (120K over pull), RIH to 6,467'. P/U 140K S/O 115K. 6,206.0 6,467.0 9/8/2023 10:30 9/8/2023 13:00 2.50 INTRM1, EVALFM CIRC X Circulate bottoms up and reciprocate string. 85 units max gas. 300 GPM 549 PSI 137K P/U 113K S/O 6,467.0 6,467.0 9/8/2023 13:00 9/8/2023 14:30 1.50 INTRM1, EVALFM TRIP X POOH f/6,467' t/5,532' with SLB MDT to CSES. 127K P/U 6,467.0 5,532.0 9/8/2023 14:30 9/8/2023 16:00 1.50 INTRM1, EVALFM DLOG X Disconnect PWCH from DWCH applying 3,000 lbs pull above line weight, released after 10 minutes. POOH with cable to surface. Remove CSES as per SLB. Pump string volume at 470 gpm w/480 psi to flush DWCH. 5,532.0 5,532.0 9/8/2023 16:00 9/8/2023 20:00 4.00 INTRM1, EVALFM TRIP P POOH f/5,532' t/160' with SLB MDT tools. 127K P/U 5,532.0 160.0 9/8/2023 20:00 9/8/2023 20:30 0.50 INTRM1, EVALFM OWFF P OWFF f/15 min - well static. SIMOPS: PJSM and prepare to L/D SLB MDT tools. 160.0 160.0 9/8/2023 20:30 9/8/2023 22:30 2.00 INTRM1, EVALFM BHAH P L/D SLB MDT & Dual Packer tools with sample bottles (5 x 420 cc + 3 x 250 cc sample bottles) as per SLB rep's. Note:Tools were packed with formation clay. MDT packer element in good condition with no signs of wear. Dual packers show signs of wear, small piece of rubber missing off top packer element and bottom packer element has signs of mushrooming. 160.0 0.0 9/8/2023 22:30 9/8/2023 23:30 1.00 INTRM1, EVALFM ELNE P Remove wireline sheave from derrick and install in elevators. Send out MDT tools off floor and clean rig floor. 0.0 0.0 9/8/2023 23:30 9/9/2023 00:00 0.50 INTRM1, EVALFM ELNE P M/U SLB MSCT tool string on wireline. 0.0 0.0 9/9/2023 00:00 9/9/2023 00:30 0.50 INTRM1, EVALFM ELOG P Continue M/U SLB MSCT tool string on wireline. Functioned tools. 0.0 0.0 9/9/2023 00:30 9/9/2023 03:00 2.50 INTRM1, EVALFM ELOG P RIH with SLB MSCT tools on wireline. Tagged up at 4,210'. Attempted to work past obstruction without any progress. 0.0 4,210.0 9/9/2023 03:00 9/9/2023 04:00 1.00 INTRM1, EVALFM ELOG T POOH with SLB MSCT tools to surface. Observed large pieces of clay on tool standoffs. Discussed with town on plan forward while POOH and decision made to run MSCT tools on TLC. 4,210.0 0.0 9/9/2023 04:00 9/9/2023 06:00 2.00 INTRM1, EVALFM DLOG P Reposition wireline sheave from elevators to derrick finger for TLC logging. R/U DWCH sub to tool string. Connect wireline cable head to DWCH and confirm communication with tools. 0.0 60.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 19/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/9/2023 06:00 9/9/2023 09:00 3.00 INTRM1, EVALFM TRIP P RIH at 55 fpm with SLB MSCT tool string on 5" DP stands to 4,050'. Fill pipe every 25 stands. SIMOPS: Re-headed wireline cable to PWCH. P/O 103K S/O 97K 60.0 4,050.0 9/9/2023 09:00 9/9/2023 11:00 2.00 INTRM1, EVALFM TRIP P RIH at 20 fpm with SLB MSCT tool string on 5" DP stands to 5,791'. Fill pipe every 25 stands. Note: No obstruction observed at 4,210'. S/O 94K 4,050.0 5,791.0 9/9/2023 11:00 9/9/2023 11:15 0.25 INTRM1, EVALFM CIRC P Fill pipe and circulate to flush DWCH. 590 GPM 600 PSI P/U 122K S/O 108K 5,791.0 5,791.0 9/9/2023 11:15 9/9/2023 12:30 1.25 INTRM1, EVALFM DLOG P Install CSES with PWCH on cable, lowered CSES below rotary and RIH with cable to 5,200'. Pump down PWCH to latch depth at 208 gpm with 233 psi. Confirmed tool checks - good latch. P/U and tighten pack off on CSES, install clamp and pull test 3,000 lbs pull - good. Set depth and confirm with SLB unit. 5,791.0 5,791.0 9/9/2023 12:30 9/9/2023 18:00 5.50 INTRM1, EVALFM TRIP P RIH f/5,791' t/9,112' w/stands 5" DP from derrick. Observed string taking weight at 7,172' & 7,359', no change in MSCT tool string head tension. P/U and went back past each with no resistance. 153K P/U 118K S/O 5,791.0 9,112.0 9/9/2023 18:00 9/10/2023 00:00 6.00 INTRM1, EVALFM DLOG P Correlate with log for core depths. Cut 17 of 50 cores w/MSCT tool on TLC f/9,055' t/8,964'. Note; Average time to cut core 3 minutes each. 9,112.0 8,964.0 9/10/2023 00:00 9/10/2023 04:00 4.00 INTRM1, EVALFM DLOG P Cut 27 of 50 cores w/MSCT tool on TLC f/8,964' t/8,912' WLM. Tool jammed on core # 27, Note: Average time to cut core 3 minutes each. P/U 154K 8,964.0 8,912.0 9/10/2023 04:00 9/10/2023 08:00 4.00 INTRM1, EVALFM DLOG P POOH at 30 fpm f/8,912' t/5,820' at CSES with SLB MSCT tools. 134K P/U 8,912.0 5,820.0 9/10/2023 08:00 9/10/2023 10:00 2.00 INTRM1, EVALFM DLOG P Disconnect PWCH from DWCH applying 3,000 lbs pull above line weight, released from DWCH. POOH with cable to surface. Remove CSES as per SLB. Note: Found SLB wireline cable was kinked in 2 places ~5' & ~10' above the CSES. 5,820.0 5,820.0 9/10/2023 10:00 9/10/2023 10:30 0.50 INTRM1, EVALFM CIRC P Circulate w/600 gpm at 680 psi. Slug pipe. 5,820.0 5,820.0 9/10/2023 10:30 9/10/2023 15:30 5.00 INTRM1, EVALFM TRIP P POOH at 30 fpm F/5,820' t/100' with SLB MSCT tools. 5,820.0 100.0 9/10/2023 15:30 9/10/2023 16:00 0.50 INTRM1, EVALFM OWFF P OWFF f/15 min - well static. SIMOPS: Prepare to L/D MSCT tools. 100.0 100.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 20/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/10/2023 16:00 9/10/2023 18:00 2.00 INTRM1, EVALFM RURD P L/D SLB MSCT tools and cores. Clean and clear rig floor. Note:23 of 27 cores recovered = 85%. Observed a core separation marker jammed in the top of core storage sleeve. This prevents the separation markers and cores from entering the storage sleeve. 100.0 0.0 9/10/2023 18:00 9/10/2023 21:30 3.50 INTRM1, DRILL OTHR P Change out upper and lower IBOP's and saver sub. Test to 3,500 psi. BHI upload MWD tools. Performed weekly BOP function test. 0.0 0.0 9/10/2023 21:30 9/10/2023 22:00 0.50 INTRM1, DRILL BHAH P RIH with BHI BHA from derrick. 0.0 186.0 9/10/2023 22:00 9/11/2023 00:00 2.00 INTRM1, DRILL TRIP P RIH f/186' t/2,900'. Filled pipe and shallow tested MWD at 25 stands. 186.0 2,900.0 9/11/2023 00:00 9/11/2023 00:45 0.75 INTRM1, DRILL TRIP P RIH f/2,900' t/4,032'. Filled pipe every 25 stands. 2,900.0 4,032.0 9/11/2023 00:45 9/11/2023 01:45 1.00 INTRM1, DRILL SLPC P Slip & cut 110' drlg line. Calibrate block height. Check COM while circulating at 200 gpm, 229 psi. 4,032.0 4,032.0 9/11/2023 01:45 9/11/2023 02:00 0.25 INTRM1, DRILL TRIP P RIH f/4,032' t/4,292'. Observed 25K weight loss. 4,032.0 4,292.0 9/11/2023 02:00 9/11/2023 02:30 0.50 INTRM1, DRILL REAM P Ream f/4,292' t/4,415' with minimal resistance. 800 GPM 1560 PSI 80-100 RPM 8K TQ 115K ROT 4,292.0 4,415.0 9/11/2023 02:30 9/11/2023 05:00 2.50 INTRM1, DRILL TRIP P RIH f/4,292' t/8,964'. Observed 25K weight loss. 4,415.0 8,964.0 9/11/2023 05:00 9/11/2023 05:30 0.50 INTRM1, DRILL REAM P P/U and Ream f/8,928' t/9,033' with minimal resistance. 800 GPM 2249 PSI 80 RPM 14K TQ 151K ROT 8,928.0 9,033.0 9/11/2023 05:30 9/11/2023 06:30 1.00 INTRM1, DRILL TRIP P RIH f/9,033' t/10,730'. 123K S/O 9,033.0 10,730.0 9/11/2023 06:30 9/11/2023 08:00 1.50 INTRM1, DRILL REAM P Precautionary Wash & Ream f/10,730' t/10,930' staging gpm up to 1000 gpm. Observed ~30' fill on bottom. 1000 GPM 3360 PSI 80 RPM 17-22K TQ 163K ROT 10,730.0 10,930.0 9/11/2023 08:00 9/11/2023 10:00 2.00 INTRM1, DRILL CIRC P Circulate and condition mud blending in BFWP w/rotating and reciprocating f/10,930' t/10,830'. Note: Change out VFD drive on #2 MP. 520 GPM 1260 PSI 50 RPM 17-20K TQ 11.8 ECD 171K ROT 402 units Max Gas 10,930.0 10,830.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 21/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/11/2023 10:00 9/11/2023 12:00 2.00 INTRM1, DRILL DDRL P Drill 12-1/4" INT 1 f/10,930' t/11,016'. 24K WOB 1025 GPM 3710 PSI 135 RPM 23K TQ ON 21K TQ OFF 11.8 ECD 171K ROT 10,930.0 11,016.0 9/11/2023 12:00 9/11/2023 18:00 6.00 INTRM1, DRILL DDRL P Drill 12-1/4" INT 1 f/11,016' t/11,675'. 25K WOB 1020 GPM 3810 PSI 150 RPM 26K TQ ON 21K TQ OFF 11.8 ECD 270K P/U 130K S/O 175K ROT ADT = 4.4 Bit Hrs = 77.8 Jar Hrs = 160 11,016.0 11,675.0 9/11/2023 18:00 9/12/2023 00:00 6.00 INTRM1, DRILL DDRL P Drill 12-1/4" INT 1 f/11,675' t/12,343'. 20K WOB 1010 GPM 3830 PSI 180RPM 27K TQ ON 22K TQ OFF 11.9 ECD 250K P/U 128K S/O 180K ROT ADT = 4.1 Bit Hrs = 81.9 Jars Hrs = 164.1 11,675.0 12,343.0 9/12/2023 00:00 9/12/2023 06:00 6.00 INTRM1, DRILL DRLG P Drill 12-1/4" INT 1 f/12,343' t/12,943'. 31K WOB 980 GPM 4020 PSI 180 RPM 29K TQ ON 22K TQ OFF 12.1 ECD 293K P/U 128K S/O 187K ROT ADT = 4.4 Bit Hrs = 86.3 Jars Hrs = 168.5 12,343.0 12,943.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 22/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/12/2023 06:00 9/12/2023 12:00 6.00 INTRM1, DRILL DRLG P Drill 12-1/4" INT 1 f/12,943' t/13,314'. Note: At 12,974' while drilling observed ECD spike to 13.1 ppg and lost 90 bbl's to formation, P/U and reamed stand and no additional losses. 17K WOB 950 GPM 3846 PSI 180 RPM 28K TQ ON 31K TQ OFF 11.9 ECD 312K P/U 128K S/O 186K ROT ADT = 4.0 Bit Hrs = 90.3 Jars Hrs = 172.5 12,943.0 13,314.0 9/12/2023 12:00 9/12/2023 15:00 3.00 INTRM1, DRILL DDRL P Drill 12-1/4" INT 1 f/13,314' t/13,561' at section TD. 20K WOB 950 GPM 3750 PSI 180 RPM 29K TQ ON 25K TQ OFF 11.8 ECD 340K P/U 125K S/O 186K ROT ADT = 2.40 Bit Hrs = 92.7 Jars Hrs = 174.9 13,314.0 13,561.0 9/12/2023 15:00 9/12/2023 18:00 3.00 INTRM1, TRIPCAS CIRC P Circulate and condition mud on bottom for 5 minutes (no rotation), P/U and rack back 1 stand. Pump 40 bbl's low vis and 40 bbl's high vis sweeps, circulate s/s while rotating and working string (25% increase fines at shakers when at surface). 950 GPM 3810 PSI 120 RPM 27K TQ OFF 11.8 ECD 340K P/U 128K S/O 186K ROT 13,561.0 13,375.0 9/12/2023 18:00 9/12/2023 18:30 0.50 INTRM1, TRIPCAS OWFF P OWFF f/ 30 min - well static. 20 RPM 26K TQ 13,375.0 13,375.0 9/12/2023 18:30 9/12/2023 21:00 2.50 INTRM1, TRIPCAS BKRM P BROOH f/13,375' t/12,810' when shaker screens blinded off (primiraly black products). 950 GPM 3750 PSI 120 RPM 26K TQ 92 Units Max Gas ( From Flow Check) 13,375.0 12,810.0 9/12/2023 21:00 9/12/2023 22:30 1.50 INTRM1, TRIPCAS CIRC P Circulate and changing screens f/200's to 170's to 140's while stagings flow rates up. 500-970 GPM 1100-3800 PSI 80-120 RPM 26-28K TQ 12,810.0 12,810.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 23/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/12/2023 22:30 9/12/2023 23:30 1.00 INTRM1, TRIPCAS BKRM P BROOH f/12,810' t/12,586', shaker screens blinded off. 970 GPM 3850 PSI 120 RPM 28.5K TQ 12,810.0 12,586.0 9/12/2023 23:30 9/13/2023 00:00 0.50 INTRM1, TRIPCAS CIRC T Circulate while changing out shakers screens. 500 GPM 1200 PSI 80 RPM 27K TQ 185K ROT 12,586.0 12,586.0 9/13/2023 00:00 9/13/2023 08:00 8.00 INTRM1, TRIPCAS BKRM P BROOH f/12,586 t/10,925'. W/ 970 GPM, 3850 PSI, 120 RPM, 28.5K TQ Notes: Observed pressure event(s) at 11,072', 10,899' with ~125psi to 200psi. Able to work though without any further issues 12,586.0 10,925.0 9/13/2023 08:00 9/13/2023 12:30 4.50 INTRM1, TRIPCAS CIRC P Circulate and condition mud from 10,925' to 11,015'. W/ 1,000 GPM, 3750 PSI, 120 RPM, 26K TQ OFF, 11.5 ECD Notes: Circulated 2 x 45 bbls sweeps and dump and dilute w/290 bbls 10,925.0 11,015.0 9/13/2023 12:30 9/13/2023 13:00 0.50 INTRM1, TRIPCAS TRIP P POOH on elevators f/11,015' t/10,705' Notess: Observed over pull @ 10,705' of 30 klbs 11,015.0 10,705.0 9/13/2023 13:00 9/14/2023 00:00 11.00 INTRM1, TRIPCAS BKRM P BROOH f/10,705' t/7,637' at ~700 - 800 fph W/ 970 GPM, 3850 PSI, 120 RPM, 28.5K TQ Notes:Slow pulling speed at 8,027' to 450 fph, observed fluctuating torque values 10,705.0 7,637.0 9/14/2023 00:00 9/14/2023 12:00 12.00 INTRM1, TRIPCAS BKRM P BROOH f/7,637' at ~4,030- 800 fph W/ 988 GPM, 2350 PSI, 120 RPM, 14.5K TQ, ECD 11.5 ppg. Notes: At ~6,500' dump and dilute with 290 bbls. Slow pull BHA into the shoe, no issues. 7,637.0 4,030.0 9/14/2023 12:00 9/14/2023 13:00 1.00 INTRM1, TRIPCAS CIRC P Circulate and condition mud at 4,030' W/ 995 GPM, 1950 PSI, 120 RPM, 11K TQ OFF, ECD 11.2 ppg. 4,030.0 4,030.0 9/14/2023 13:00 9/14/2023 15:30 2.50 INTRM1, TRIPCAS TRIP P TOOH to BHA. Notes: OWFF at HWDP, well is static. 4,030.0 556.0 9/14/2023 15:30 9/14/2023 18:00 2.50 INTRM1, TRIPCAS BHAH P PJSM and LD 12/14" BHA, Clean and clear floor. 556.0 0.0 9/14/2023 18:00 9/14/2023 19:00 1.00 INTRM1, CASING WWWH P RU and Flush the BOP stack to clear any debris. RU and pull the waer bushing. 0.0 0.0 9/14/2023 19:00 9/14/2023 20:30 1.50 INTRM1, CASING PUTB P PJSM & RU to Run 9 5/8" casing. 0.0 0.0 9/14/2023 20:30 9/15/2023 00:00 3.50 INTRM1, CASING PUTB P Run 9 5/8" casing per detail to 1,550' Notes: Confirmed FS is pinned, MU shoe track & pump to ensure functioning properly. 0.0 1,550.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 24/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/15/2023 00:00 9/15/2023 05:00 5.00 INTRM1, CASING PUTB P Run 9 5/8" casing per detail to 4,050' Notes: Displacement volumes tracking per plan, top off every 10 jts 1,550.0 4,050.0 9/15/2023 05:00 9/15/2023 06:00 1.00 INTRM1, CASING CIRC P Circulate and condition mud at 4,050', W/ 251 GPM, 161 PSI, Notes: Circulate bottoms up. Obtain TQD measures at 4,050': 165 PUW, 141 SOW, 151 RTW, 9.5k TQ w/20 RPM 4,050.0 4,050.0 9/15/2023 06:00 9/15/2023 11:00 5.00 INTRM1, CASING PUTB P Run 9 5/8" casing per detail to 7,300' Notes: Displacement volumes tracking closely per plan, top off every 10 jts 4,050.0 7,300.0 9/15/2023 11:00 9/15/2023 12:30 1.50 INTRM1, CASING CIRC P Circulate and condition mud at 7,300', W/ 330 GPM, 240 PSI, 265 PUW, 155 SOW Notes: Circulate casing volume 7,300.0 7,300.0 9/15/2023 12:30 9/15/2023 17:00 4.50 INTRM1, CASING PUTB P Run 9 5/8" casing per detail to 9,950' Notes: Displacement volumes tracking closely per plan, top off every 10 jts 7,300.0 9,950.0 9/15/2023 17:00 9/15/2023 18:30 1.50 INTRM1, CASING CIRC P Circulate and condition mud at 9,950', W/ 330 GPM, 315 PSI, 350 PUW, 175 SOW Notes: Circulate casing volume 9,950.0 9,950.0 9/15/2023 18:30 9/15/2023 20:00 1.50 INTRM1, CASING PUTB P Run 9 5/8" casing per detail to 10,900' Notes: Displacement volumes tracking closely per plan, top off every 10 jts 9,950.0 10,900.0 9/15/2023 20:00 9/15/2023 20:30 0.50 INTRM1, CASING CIRC P Circulate and condition mud at 10,900', W/ 205 GPM, 250PSI, 370 PUW, 180 SOW Notes:Pull spider slips and slack off to adjust the drilling line on drawworks spool 10,900.0 10,900.0 9/15/2023 20:30 9/16/2023 00:00 3.50 INTRM1, CASING PUTB P Run 9 5/8" casing per detail to 12,800' Notes: Displacement volumes tracking closely per plan, top off every 10 jts 10,900.0 12,800.0 9/16/2023 00:00 9/16/2023 04:00 4.00 INTRM1, CASING PUTB P Run 9 5/8" casing per detail from 12,800' to 13,549' Notes: At ~12,500' began observing additoinal drag wiith FF trend at ~.25 -.30. At 13,117' began working casing string down with Volant, attempted to circulate, not able to pump. Continue to work casing string down to 13,549', Landed successfully on hanger 12,800.0 13,549.0 9/16/2023 04:00 9/16/2023 08:45 4.75 INTRM1, CASING CIRC P Circulate and conditon mud at 13,549', w/10 GPM 750 PSI Notes: Initially unable to establish circulation. After cycling pressure to 750 psi several times, began to get returns 13,549.0 13,549.0 9/16/2023 08:45 9/16/2023 09:15 0.50 INTRM1, CASING SVRG P Perform rig maintanence and inspect Volant tool 13,549.0 13,549.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 25/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/16/2023 09:15 9/16/2023 14:45 5.50 INTRM1, CASING CIRC P Circulate and conditon mud at 13,549', w/250 GPM 389 PSI Notes:Slowly staged pump rate up over several hours until pressures balance and are able to pump at full cement rate. 13,549.0 13,549.0 9/16/2023 14:45 9/16/2023 16:15 1.50 INTRM1, CEMENT CMNT P PJSM, RU and test cement lines to 3500 PSI Notes: Service cement line demco valve and re-test 13,549.0 13,549.0 9/16/2023 16:15 9/16/2023 21:45 5.50 INTRM1, CEMENT CMNT P PJSM, Pump Int 1 cement job per detail. - Mix and pump 63.9 bbls mud push (extra 3.9 bbls mud push) - Drop bottom plug - Mix and pump 254.2 bbls of 13 ppg Lead cement - Mix and pump 152 bbls of 15.8 ppg Tail cement (Tail wet at 1800 hrs) - Drop top plug - Pump 20 bbls clean up H20 - Displace with 989 bbls NAF mud (bumped 8368 stks) - Initial rate - 6 BPM, 380 PSI - Final rate - 3 BPM, 585 PSI - After bump: 1100 PSI for 5 min (charted) Bumped at 2145 hrs - Bleed off check floats - Floats held 13,549.0 13,549.0 9/16/2023 21:45 9/16/2023 22:45 1.00 INTRM1, CEMENT PRTS P PJSM. RU and Test 9 5/8" casing to 3500 psi for 30 min (Charted) Notes: Pump 126 stks (14.8 bbls), After test bleed back ~15 bbls 0.0 0.0 9/16/2023 22:45 9/17/2023 00:00 1.25 INTRM1, CEMENT CLEN P RD from Cement job, RD Volant CRT, cement lines, Blow down all, Clean and clear rig floor. 0.0 0.0 9/17/2023 00:00 9/17/2023 00:30 0.50 INTRM1, CEMENT CMNT P Lay down Landing joint, Casing equipment, PU single of 5" DP for setting pack-off 0.0 0.0 9/17/2023 00:30 9/17/2023 02:00 1.50 INTRM1, CEMENT WWSP P RU and set 9 5/8" pack-off per FMC Rep. Test pack-off to 5000 psi for 10 min. Test was successful Notes: Company Rep witness the test 0.0 0.0 9/17/2023 02:00 9/17/2023 03:00 1.00 INTRM1, CEMENT NUND P RU and change upper rams to 4 1/2" x 7" Notes: SIMOPS - PU test Joint, MU floor valves, etc. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 26/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/17/2023 03:00 9/17/2023 10:00 7.00 INTRM1, WHDBOP BOPE P RU and begin testing BOPE 250/3500 psi - Fill stack w/H2O, perform shell test -Test annular & Ram #1,2 and 3 to 250/3500psi f/ 5/10min w/ 5" & 7" test joint. -Test 2 ea 5" and 4" FOSV and 1 ea 5" and 4" dart. -Function primary and remote BOPE control stations. -Test LEL and H2S gas alarms. Function and grease choke valve 6, retest good. - Service manual choke valve, retest good. - Perform koomy draw-down test Complete derrick inspection per DDI guidelines - BLM Rep Mutasim Elganzoory Waived witness. - AOGCC Rep Brian Bixby waived witness. Note: SIMOPS - change swab and liner to 5 1/2" 0.0 0.0 9/17/2023 10:00 9/17/2023 11:30 1.50 INTRM1, WHDBOP BOPE P Remove Test joint and trip nipple. Install MPD test cap and flood MPD lines - Test MPD to 250/1800 psi. Test good. Remove test cap and Test line, Install trip nipple 0.0 0.0 9/17/2023 11:30 9/17/2023 13:00 1.50 INTRM1, WHDBOP BOPE P Remove test plug and install wear bushing. Blow down choke and kill lines from BOP test. Clean and clear floor 0.0 0.0 9/17/2023 13:00 9/17/2023 14:30 1.50 INTRM1, DRILLOUT SLPC P PJSM. Cut and slip 94' fo drilling line, Service rig 0.0 0.0 9/17/2023 14:30 9/17/2023 18:00 3.50 INTRM1, DRILLOUT BHAH P PJSM. PU BHA #7 per directional driller - PU bit, auto-trak, MWD, non-mags, exp reamer, stab, circ-sub, HWDP, and jars Notes: Found washout between first and second joint of drill collars. Lay down both joints, Pick up new to replace 0.0 542.0 9/17/2023 18:00 9/17/2023 19:30 1.50 INTRM1, DRILLOUT TRIP P TIH with BHA #5 f/542' t/2,890' Note: Fill pipe every 25 stds 542.0 2,890.0 9/17/2023 19:30 9/17/2023 20:30 1.00 INTRM1, DRILLOUT DHEQ T Fill pipe and test Baker tools w/600 GPM, 2150 psi Notes: Cycle pumps and downlink several times to sync up tools and adjust tool parameters between surface and downhole tools. Trouble shooting with remote MWD and night directional driller 2,890.0 2,890.0 9/17/2023 20:30 9/18/2023 00:00 3.50 INTRM1, DRILLOUT TRIP P TIH with BHA #5 f/2,890' t/10,067' Note: Fill pipe every 25 stds 2,890.0 10,067.0 9/18/2023 00:00 9/18/2023 02:30 2.50 INTRM1, DRILLOUT TRIP P TIH with BHA #5 f/10,067' t/13,194' Note: Fill pipe every 25 stds, 10,067.0 13,194.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 27/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/18/2023 02:30 9/18/2023 03:30 1.00 INTRM1, DRILLOUT REAM P Wash down f/ 13,194' t/13,456'. W/250 GPM 975 PSI Notes: No cement stringers or excessive drag observed while washing to plugs & FC 13,194.0 13,456.0 9/18/2023 03:30 9/18/2023 07:30 4.00 INTRM1, DRILLOUT DRLG P Begin drillling out shoe track and rat hole f/13,456' t/13,561' 580 GPM 3650 PSI 60 RPM 14.5K TQ 3-12 WOB 12.8 ECD F/O 35% Notes: Tag plugs, FC, and FS on depth, 13,456.0 13,561.0 9/18/2023 07:30 9/18/2023 08:00 0.50 INTRM1, DRILLOUT DDRL P Drill 20' new hole f/13,561' t/13,581' 580 GPM 3650 PSI 80 RPM 14.5K TQ 3-12 WOB 12.8 ECD F/O 35% Jar Hrs 175.2 Notes: Tag plugs, FC, and FS on depth 13,561.0 13,581.0 9/18/2023 08:00 9/18/2023 10:00 2.00 INTRM1, DRILLOUT CIRC P Circulate and condition mud for FIT. Work string f/13,581' t/ 13,495' 580 GPM 3500 PSI 60 RPM 11K TQ 12.7 ECD F/O 35% Notes: Work string across the FS multiple times, no issues 13,581.0 13,495.0 9/18/2023 10:00 9/18/2023 11:00 1.00 INTRM1, DRILLOUT FIT P RU and perfom FIT to 14.1 ppge mw at 13,495' W/ 6 BPM for 43 STKS, 990 PSI Notes: Bled back 3.6 BBLS 13,495.0 13,495.0 9/18/2023 11:00 9/18/2023 12:00 1.00 INTRM2, DRILL MPDA P Remove trip nipple and install MPD bearing and break in MPD bearing per the MPD Notes: Obtain TQ&D parameters PUW=226, SOW=162k, RTW=179k, TQ=12k, Obtain SPR's 13,495.0 13,581.0 9/18/2023 12:00 9/18/2023 14:00 2.00 INTRM2, DRILL DDRL P Drill Int2 f/13,561' t/13,671' 590 GPM 3750 PSI 90 RPM 14K TQ 13 ECD F/O 35% Notes: Begin trapping ~500psi with MPD to maintain 13 ppge mw during connections 13,581.0 13,671.0 9/18/2023 14:00 9/18/2023 16:00 2.00 INTRM2, DRILL UREM P Activate under-reamer at 13,645' per detail - BROOH f/13,671' t/13,645' - Gather baseline parameters and drop 1.25" activation ball - Pump ball drown W/250 GPM, 1265 PSI, BOS @ 2496 STKS - PSI up to 1400 PSI, Observed PSI drop - Stage pump up to 590 GPM, 3460 PSI - Confirm UR open, Cut 5' 9 7/8" ledge - Set down 13k to confirm ledge cut - Good test 13,671.0 13,671.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 28/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/18/2023 16:00 9/19/2023 00:00 8.00 INTRM2, DRILL DDRL P Drill Int2 f/13,671' to 14,300' 647 GPM 3850 PSI 161 RPM 17-19K TQ 11k WOB 13 ECD 169 RTW F/O 35% 4.2 ADT 7 TBH 181.9 TJH Notes: Hold ~500psi W/MPD to maintain 13 ppge mw during connections. Drilling with 9 7/8" UR open. 13,671.0 14,298.0 9/19/2023 00:00 9/19/2023 06:00 6.00 INTRM2, DRILL DDRL P Drill Int2 f/14,298' t/14,790' 640 GPM 3810 PSI 161 RPM 20K TQ 10k WOB 13 ECD 186 RTW F/O 30% 4.0 ADT 11 TBH 185.9 TJH Notes: Hold ~500psi W/MPD to maintain 13 ppge mw during connections. Drilling with 9 7/8" UR open. 14,298.0 14,790.0 9/19/2023 06:00 9/19/2023 16:30 10.50 INTRM2, DRILL DDRL P Drill Int2 f/14,790' t/15,527' 640 GPM 3810 PSI 161 RPM 20K TQ 10k WOB 12.9 ECD 186 RTW F/O 3% 8.6 ADT 19.6 TBH 1194.5 TJH Notes: Hold ~500psi W/MPD to maintain 12.9 ppge mw during connections. Drilling with 9 7/8" UR open. Slow ROP last couple stands and pump background LCM 14,790.0 15,527.0 9/19/2023 16:30 9/19/2023 17:30 1.00 INTRM2, TRIPCAS CIRC P Circulate and condition mud - Pump hole volume before closing UR @ 15,512' 660 GPM 3350PSI 140 RPM 20K TQ 12.7 ECD F/O 35% Notes: Obtain final survey at TD, Downlink tools, 15,512.0 15,512.0 9/19/2023 17:30 9/19/2023 19:00 1.50 INTRM2, TRIPCAS UREM P Function UR closed per Directinal Driller @ 15,512' - Drop 1.75 torlon ball and pump down W/250 GPM, 1600 PSI, for 1600 STKS - Slow pump 100 GPM, 640 PSI last ~1000 STKS - Ball on seat at 2738 STKS - Pressure up to 1720 PSI - Confirm UR closed - ~300 PSI and 600 TRPM increase - Confirmed 15,512.0 15,512.0 9/19/2023 19:00 9/19/2023 21:30 2.50 INTRM2, TRIPCAS CIRC P Circulate and condition mud for SOOH @ 15512' 640 GPM 3900 PSI 120 RPM 17K TQ 12.8 ECD F/O 30% Notes: Circulate 2.5 BU, Hole appeares to be clean. No pressure or tq spikes observed. OWFF with ~490psi for a12.7 ppge for 10 minutes. No pressure build. Well is static, 15,512.0 15,512.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 29/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/19/2023 21:30 9/20/2023 00:00 2.50 INTRM2, TRIPCAS SMPD P SOOH f/15,512' t/ 13,546' Notes: No overpulls observed while SOOH. Maintain 12.7 ppge per MPD schedule 15,512.0 13,546.0 9/20/2023 00:00 9/20/2023 01:00 1.00 INTRM2, TRIPCAS CIRC P Circulate hole clean f/ shoe. Rotate and reciprocate pipe. 650 GPM 3790 PSI 60 RPM 10-13k TQ 12.8ppg ECD 219k PU 167k SO 182k ROT 13,546.0 13,546.0 9/20/2023 01:00 9/20/2023 02:00 1.00 INTRM2, TRIPCAS OWFF P Flow check. Initial 1.27 BPH. After 15 minutes .5 BPH. 13,546.0 13,546.0 9/20/2023 02:00 9/20/2023 13:30 11.50 INTRM2, TRIPCAS SMPD P SOOH f/ 13546' to 660'. Holding 12.7ppg EMW w/ MPD. Note: Dropped 2.40" hollow drift on std #135. 13,546.0 660.0 9/20/2023 13:30 9/20/2023 14:00 0.50 INTRM2, TRIPCAS MPDA P Retrieve RCD bearing assembly and install trip nipple. 660.0 660.0 9/20/2023 14:00 9/20/2023 14:30 0.50 INTRM2, TRIPCAS OWFF P Flow check. Static. 660.0 660.0 9/20/2023 14:30 9/20/2023 16:30 2.00 INTRM2, TRIPCAS BHAH P LD BHA. 660.0 0.0 9/20/2023 16:30 9/20/2023 17:30 1.00 INTRM2, CASING CLEN P Clean and clear rig floor 0.0 0.0 9/20/2023 17:30 9/20/2023 19:00 1.50 INTRM2, CASING RURD P RU to run liner. 0.0 0.0 9/20/2023 19:00 9/21/2023 00:00 5.00 INTRM2, CASING PUTB P MU shoetrack. Threadlock connections. Pumped through shoetrack w/ 10 bbls and check floats. Ok. RIH w/ 7" liner. Note: Joints 1-23 - 7" 29# TN110Cr13S Hyd 563 Joints 24-50 - 7" 29# L-80 Hyd 563 MU torque- 13.2k ft/lbs. Torque turn connections. 0.0 1,659.0 9/21/2023 00:00 9/21/2023 00:45 0.75 INTRM2, CASING PUTB P RIH w/ 7" liner f/ 1659' to 2138' Note: Joints 1-23 - 7" 29# TN110Cr13S Hyd 563 Joints 24-50 - 7" 29# L-80 Hyd 563 MU torque- 13.2k ft/lbs. Torque turn connections. 1,659.0 2,138.0 9/21/2023 00:45 9/21/2023 01:15 0.50 INTRM2, CASING PUTB P PU and MU liner hanger as per Baker. Fill w/ ZanPlex 2,138.0 2,230.0 9/21/2023 01:15 9/21/2023 02:00 0.75 INTRM2, CASING CIRC P Break circulation and stage up rate to 6 BPM 6 BPM 290 PSI 2,230.0 2,230.0 9/21/2023 02:00 9/21/2023 02:30 0.50 INTRM2, CASING RGRP T Washpipe leaking SD and change packing. 2,230.0 2,230.0 9/21/2023 02:30 9/21/2023 03:00 0.50 INTRM2, CASING CIRC P Finish circulating liner volume. 2,230.0 2,230.0 9/21/2023 03:00 9/21/2023 03:30 0.50 INTRM2, CASING MPDA P Retrieve trip nipple and install RCD bearing assembly. 2,230.0 2,245.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 30/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/21/2023 03:30 9/21/2023 12:30 9.00 INTRM2, CASING RUNL P SIH w/ liner on DP. Holding 12.7ppg EMW w/ MPD. 2,245.0 13,545.0 9/21/2023 12:30 9/21/2023 13:00 0.50 INTRM2, CASING CIRC P Circulate pipe volume at shoe. Take parameters. 232k PU 137k SO 180k ROT 13,545.0 13,545.0 9/21/2023 13:00 9/21/2023 15:00 2.00 INTRM2, CASING RUNL P SIH w/ liner on DP f/ 13545 to 15500. Holding 12.7ppg EMW. 13,545.0 15,500.0 9/21/2023 15:00 9/21/2023 15:30 0.50 INTRM2, CASING RURD P MU cement swivel and cement line. 15,500.0 15,500.0 9/21/2023 15:30 9/21/2023 16:30 1.00 INTRM2, CASING REAM P Ream to bottom. 84 GPM 930 PSI 20 RPM 18k TQ 195k ROT 15,500.0 15,527.0 9/21/2023 16:30 9/21/2023 19:00 2.50 INTRM2, CEMENT CIRC P Tag bottom. PU 1 ft. Stage rate to 6 BPM and circulate BU. Held PJSM f/ cement job while circulating. 252 GPM 885 PSI Note: Shoe depth 15526' 15,527.0 15,526.0 9/21/2023 19:00 9/21/2023 21:30 2.50 INTRM2, CEMENT CMNT P Flood lines and test to 4700 PSI. Pump 70BBLS of 8.9ppg KCL Chem Wash. 126 GPM/715 PSI. Drop bottom dart. Swap to cementers. Pump 77.2 BBLS of 15.8ppg cement @ 4-4.5 BPM. SD and drop top dart. Pump 10 BBLS FW w/ cement unit. Swap to rig pumps and displace at 6 BPM 600-850 PSI. Slow rate to 3 BPM and bump plug. Pressure up to 500 PSI over FCP to 1000 PSI. Hold f/ 5 minutes and check floats. Good. 1.3 BBLs bled back. Full returns throughout job. No losses. Cement in place @ 21:30hrs 9/21/23 15,526.0 15,526.0 9/21/2023 21:30 9/22/2023 00:00 2.50 INTRM2, CEMENT PACK P Set liner hanger and packer as per Baker rep. RU and test liner top packer to 1000 PSI f/ 10 minutes. Good test. 15,526.0 15,526.0 9/22/2023 00:00 9/22/2023 02:15 2.25 INTRM2, CEMENT CIRC P Circulate and clean up TOL. LD cement swivel. Install wiper ball.Stage rates up to 630 GPM. Circulate BU. (200bbls interface) 15,526.0 13,328.0 9/22/2023 02:15 9/22/2023 03:15 1.00 INTRM2, CEMENT SLPC P Slip/Cut drilling line. 13,328.0 13,328.0 9/22/2023 03:15 9/22/2023 04:00 0.75 INTRM2, CEMENT MPDA P Retrieve RCD bearing asembly. Install trip nipple. 13,328.0 13,290.0 9/22/2023 04:00 9/22/2023 12:00 8.00 INTRM2, CEMENT TRIP P Pump slug. POOH culling DP (worn hardbanding) to 35'. 13,290.0 35.0 9/22/2023 12:00 9/22/2023 13:00 1.00 INTRM2, CEMENT PULD P LD running tool. 35.0 0.0 9/22/2023 13:00 9/22/2023 13:30 0.50 INTRM2, WHDBOP RURD P Retrieve wear bushing. 0.0 0.0 9/22/2023 13:30 9/22/2023 14:30 1.00 INTRM2, WHDBOP CIRC P MU jetting tool and jet stack. 0.0 0.0 9/22/2023 14:30 9/22/2023 15:30 1.00 INTRM2, WHDBOP RURD P Pull 5" RCD bearing assembly off of pup joint. Swap out UPR to 2 7/8" x 5 1/2" VBR. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 31/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/22/2023 15:30 9/22/2023 20:30 5.00 INTRM2, WHDBOP BOPE P RU test equipment. Test annular/UPR and LPR w/ 4" test joint. Test UPR and LPR w/ 5.5" test joint. All tests 250/3500 PSI. 5/10 min ea.RD test equipment. 0.0 0.0 9/22/2023 20:30 9/22/2023 21:00 0.50 INTRM2, WHDBOP RURD P Install 8.75" wear bushing. 0.0 0.0 9/22/2023 21:00 9/22/2023 22:30 1.50 INTRM2, WHDBOP PRTS P Test casing to 3500 PSI. for 30 minutes. Good test. 0.0 0.0 9/22/2023 22:30 9/23/2023 00:00 1.50 INTRM2, DRILLOUT BHAH P MU and RIH w/ production BHA. 0.0 100.0 9/23/2023 00:00 9/23/2023 01:45 1.75 INTRM2, DRILLOUT BHAH P MU and RIH w/ 6 5/16" x 6 1/8" production BHA to 239' 100.0 239.0 9/23/2023 01:45 9/23/2023 06:00 4.25 INTRM2, DRILLOUT PULD P RIH w/ BHA f/ 239' to 6000' on 4" DP picking up doubles out of pipe shed. 239.0 6,000.0 9/23/2023 06:00 9/23/2023 10:15 4.25 INTRM2, DRILLOUT PULD P RIH logging at 1800 ft/hr w/ BHA f/6000' to 8500' on 4" DP picking up doubles out of pipe shed. 6,000.0 8,500.0 9/23/2023 10:15 9/23/2023 15:00 4.75 INTRM2, DRILLOUT PULD P RIH logging at 4600 ft/hr w/ BHA f/8500' to 13300' on 4" DP picking up doubles out of pipe shed. 8,500.0 13,300.0 9/23/2023 15:00 9/23/2023 17:00 2.00 INTRM2, DRILLOUT PULD P RIH logging at 1800 ft/hr w/ BHA f/13300' to 15285' on 4" DP. 13,300.0 15,285.0 9/23/2023 17:00 9/23/2023 21:30 4.50 INTRM2, DRILLOUT DRLG P Wash/ream down f/ 15285' to 15324'. Tag cement stringer. Drillout plugs/landing collar @ 15435'. 200 GPM 1950 PSI 60 RPM 12k TQ 15,285.0 15,435.0 9/23/2023 21:30 9/23/2023 22:30 1.00 INTRM2, DRILLOUT CIRC T Tools turned off. Cycle pumps. Perform hard reset. No success. Troubleshoot 15,435.0 15,435.0 9/23/2023 22:30 9/24/2023 00:00 1.50 INTRM2, DRILLOUT DRLG P Tools still not powering on. Drill shoetrack and float collar to 15500' 15,435.0 15,500.0 9/24/2023 00:00 9/24/2023 00:30 0.50 INTRM2, DRILLOUT DRLG P Drill FC and shoetrack to 15520'. (5' above FS). 15,500.0 15,520.0 9/24/2023 00:30 9/24/2023 05:30 5.00 INTRM2, DRILLOUT CIRC P Pump 40bbl LVT spacer + 100bbl 12.5ppg transition spacer + 100bbls cleaning spacer + 50bbls 8.8 viscosified tail spacer. Displace w/ 8.8ppg FloPro. 15,520.0 15,520.0 9/24/2023 05:30 9/24/2023 08:00 2.50 INTRM2, DRILLOUT CLEN P Clean shakers/Trough/flowline and flow box. 15,520.0 15,520.0 9/24/2023 08:00 9/24/2023 09:00 1.00 INTRM2, DRILLOUT CIRC P Take SPRs. Troubleshoot bulk hopper. 15,520.0 15,520.0 9/24/2023 09:00 9/24/2023 20:30 11.50 INTRM2, DRILLOUT TRIP T POOH f/ 15520' to 540'. Several tight connections. 15,520.0 540.0 9/24/2023 20:30 9/25/2023 00:00 3.50 INTRM2, DRILLOUT BHAH T PJSM. LD BHA. Plug in and diagnose communication issue. 540.0 0.0 9/25/2023 00:00 9/25/2023 01:45 1.75 INTRM2, DRILLOUT BHAH T MU and RIH w/ 6 5/16" x 6 1/8" BHA. 0.0 237.0 9/25/2023 01:45 9/25/2023 12:00 10.25 INTRM2, DRILLOUT TRIP T RIH w/ 6 5/16" x 6 1/8" production BHA f/ 237' to 14899'. PU dobles from pipe shed and stds out of derrick. Shallow est on first fill up. Good test. 237.0 14,899.0 9/25/2023 12:00 9/25/2023 13:45 1.75 INTRM2, DRILLOUT WASH T RIH f/ 14899'. Tag obstruction at 14940'. Wash down f/ 14940' to 15187'. RIH on elevators 15187' to 15465'. 14,899.0 15,465.0 9/25/2023 13:45 9/25/2023 15:00 1.25 INTRM2, DRILLOUT SLPC T Slip/Cut drill line. 15,465.0 15,465.0 9/25/2023 15:00 9/25/2023 16:00 1.00 INTRM2, DRILLOUT SFTY P Perform choke drill with rig crew. 15,465.0 15,465.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 32/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/25/2023 16:00 9/25/2023 16:30 0.50 INTRM2, DRILLOUT WASH P Wash down and tag cement at 15523'. 212 GPM 1020 PSI 50 RPM 18k TQ 15,465.0 15,523.0 9/25/2023 16:30 9/25/2023 18:00 1.50 INTRM2, DRILLOUT DRLG P Drill out cement and FS to 15527'. 212 GPM 1020 PSI 60 RPM 20k TQ 8k WOB 15,523.0 15,527.0 9/25/2023 18:00 9/25/2023 18:30 0.50 INTRM2, DRILLOUT DDRL P Drill 15527' to 15535'. Torque up and stalling 24k TQ @ 15535'. 20-30k Overpull 6k WOB 212 GPM 1020 PSI 60 RPM 21k TQ 15,527.0 15,535.0 9/25/2023 18:30 9/25/2023 20:00 1.50 INTRM2, DRILLOUT CIRC T Work pipe. 20-30k overpull and up to 24k torque. No pressure increases observed. Mousehole stand and work pipe to free obstruction. Ream back to 15535'. 15,535.0 15,535.0 9/25/2023 20:00 9/25/2023 20:30 0.50 INTRM2, DRILLOUT DDRL P Drill 15535' to 15547'. 6k WOB 212 GPM 1020 PSI 60 RPM 21k TQ 15,535.0 15,547.0 9/25/2023 20:30 9/25/2023 21:00 0.50 INTRM2, DRILLOUT CIRC P Circulate and backream up into casing to 15472'. 15,547.0 15,472.0 9/25/2023 21:00 9/25/2023 22:30 1.50 INTRM2, DRILLOUT FIT P RU test equipment. Perform FIT to 12.0ppg EMW. RD test equipment. 15,472.0 15,472.0 9/25/2023 22:30 9/26/2023 00:00 1.50 PROD1, DRILL MPDA P Retrieve trip nipple and install 4" RCD bearing assembly. Break in bearing. Take SPRs. 15,472.0 15,472.0 9/26/2023 00:00 9/26/2023 06:00 6.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 15547' MD to 16039' MD / 8201' TVD. Closing chokes on connections. 0 PSI build up. 14k WOB 240 GPM 1310 PSI 100 RPM 19k TQ on bttm 19k TQ off bttm 9.3ppg ECD 700 units Max gas @ 15972' 15,472.0 16,039.0 9/26/2023 06:00 9/26/2023 12:00 6.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 16039' MD to 16566' MD / 8232' TVD. Closing chokes on connections. 0 PSI build up. 20k WOB 240 GPM 1350 PSI 120 RPM 12k TQ on bttm 9.4ppg ECD 600 units Max gas @ 16255' 16,039.0 16,566.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 33/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/26/2023 12:00 9/26/2023 18:00 6.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 16566' MD to 17268' MD / 8232' TVD. Closing chokes on connections. 0 PSI build up. 12k WOB 240 GPM 1430 PSI 120 RPM 12k TQ on bttm 9.5ppg ECD 450 units Max gas @ 16620' 16,566.0 17,268.0 9/26/2023 18:00 9/27/2023 00:00 6.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 17268' MD to 18000' MD / 8186' TVD. Closing chokes on connections. 0 PSI build up. 12k WOB 240 GPM 1550 PSI 120 RPM 12k TQ 9.5ppg ECD 192k PU 113k SO 149k ROT 1121 units Max gas @ 17950' 17,268.0 18,000.0 9/27/2023 00:00 9/27/2023 00:45 0.75 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 18000' MD to 18050' MD / 8188' TVD. Closing chokes on connections. 0 PSI build up. 12k WOB 240 GPM 1550 PSI 120 RPM 12k TQ 9.5ppg ECD 192k PU 113k SO 150k ROT units Max gas @ 17950' 18,000.0 18,050.0 9/27/2023 00:45 9/27/2023 02:00 1.25 PROD1, DRILL MPDA P Swap RCD bearing f/ 4" to 5" 18,050.0 18,050.0 9/27/2023 02:00 9/27/2023 12:00 10.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 18050' MD to 19161' MD / 8199' TVD. Closing chokes on connections. 0 PSI build up. 11k WOB 240 GPM 1560 PSI 120 RPM 13k TQ 9.6ppg ECD 196k PU 122k SO 155k ROT 1728units Max gas @ 19106' 18,000.0 19,161.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 34/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/27/2023 12:00 9/27/2023 18:00 6.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 19161' MD to 19822' MD / 8198' TVD. Closing chokes on connections. 0 PSI build up. 11k WOB 240 GPM 1580 PSI 120 RPM 11k TQ 9.6ppg ECD 203k PU 119k SO 169k ROT units Max gas @ ' 19,161.0 19,822.0 9/27/2023 18:00 9/28/2023 00:00 6.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 19822' MD to 20575' MD / 8205' TVD. Closing chokes on connections. 0 PSI build up. 14k WOB 240 GPM 1580 PSI 120 RPM 16k TQ 9.7ppg ECD 209k PU 124k SO 168k ROT 240units Max gas @ 20457' 19,161.0 20,575.0 9/28/2023 00:00 9/28/2023 06:00 6.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 20575' MD to 21234' MD / 8195' TVD. Closing chokes on connections. 0 PSI build up. 10k WOB 240 GPM 1640 PSI 120 RPM 19k TQ 9.7ppg ECD 212k PU 120k SO 158k ROT 904units Max gas @ 21250' 20,575.0 21,234.0 9/28/2023 06:00 9/28/2023 12:00 6.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 21234' MD to 21895' MD / 8189' TVD. Closing chokes on connections. 0 PSI build up. 12k WOB 240 GPM 1580 PSI 120 RPM 19k TQ 9.7ppg ECD 215k PU 123k SO 165k ROT 904units Max gas @ 21250' 21,234.0 21,895.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 35/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/28/2023 12:00 9/28/2023 18:00 6.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 21895' MD to 22595' MD / 8192' TVD. Closing chokes on connections. 0 PSI build up. 14k WOB 240 GPM 1580 PSI 120 RPM 16k TQ 9.7ppg ECD 206k PU 122k SO 164k ROT 1285units Max gas @ 22545' 21,234.0 21,895.0 9/28/2023 18:00 9/29/2023 00:00 6.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 22595' MD to 23308' MD / 8186' TVD. Closing chokes on connections. 0 PSI build up. 12k WOB 240 GPM 1660 PSI 100 RPM 21k TQ 9.8ppg ECD 221k PU 120k SO 163k ROT 21,895.0 23,308.0 9/29/2023 00:00 9/29/2023 06:00 6.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 23308' MD to 24061' MD / 8186' TVD. Closing chokes on connections. 0 PSI build up. 14k WOB 240 GPM 1700 PSI 120 RPM 24k TQ 9.8ppg ECD 233k PU k SO 171k ROT 23,308.0 24,061.0 9/29/2023 06:00 9/29/2023 13:00 7.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 24061' MD to 24785' MD / 8167' TVD. Closing chokes on connections. 0 PSI build up. 14k WOB 240 GPM 1740 PSI 140 RPM 26k TQ 9.8ppg ECD 230k PU k SO 171k ROT 24,061.0 24,785.0 9/29/2023 13:00 9/29/2023 17:00 4.00 PROD1, DRILL CIRC T Observed flow increase. SD and flow check. Stsatic. Bring pumps back on and observed 700PSI decrease in pump pressure. Troubleshoot all surface equipment. No issues. No communication with DH tools. 24,785.0 24,785.0 9/29/2023 17:00 9/29/2023 17:30 0.50 PROD1, DRILL OWFF T Flow check. Static. Prep to SOOH. 24,785.0 24,785.0 9/29/2023 17:30 9/30/2023 00:00 6.50 PROD1, DRILL SMPD T SOOH f/ 24785' to 21331'. 24,785.0 21,331.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 36/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/30/2023 00:00 9/30/2023 04:30 4.50 PROD1, DRILL SMPD T SOOH f/ 21331' to 18047'. 21,331.0 18,047.0 9/30/2023 04:30 9/30/2023 05:15 0.75 PROD1, DRILL SMPD T Flow check. Slight loss. Swap RCD bearing assembly 5" to 4". 18,047.0 18,047.0 9/30/2023 05:15 9/30/2023 09:15 4.00 PROD1, DRILL SMPD T SOOH f/ 18047' to 15469'. 18,047.0 15,469.0 9/30/2023 09:15 9/30/2023 09:30 0.25 PROD1, DRILL OWFF T Flow check. Static 15,469.0 15,469.0 9/30/2023 09:30 9/30/2023 12:30 3.00 PROD1, DRILL SMPD T SOOH f/ 15469' to 13303'. 15,469.0 13,303.0 9/30/2023 12:30 9/30/2023 13:30 1.00 PROD1, DRILL MPDA T Flow check. Static. Retrieve RCD bearing assembly and install trip nipple. 13,303.0 13,303.0 9/30/2023 13:30 9/30/2023 19:00 5.50 PROD1, DRILL TRIP T SOOH f/ 13303' to 6483'. 13,303.0 6,483.0 9/30/2023 19:00 9/30/2023 23:30 4.50 PROD1, DRILL PULD T POOH f/ 6483' to 3645' LD doubles to pipe shed. 6,483.0 3,645.0 9/30/2023 23:30 10/1/2023 00:00 0.50 PROD1, DRILL SVRG T Service rig. Inspect TD. 3,645.0 3,645.0 10/1/2023 00:00 10/1/2023 04:30 4.50 PROD1, DRILL TRIP T POOH f 3645' to 237'. LD doubles to pipeshed. Found washout on Std #31 3,645.0 237.0 10/1/2023 04:30 10/1/2023 04:45 0.25 PROD1, DRILL OWFF T Flow check. Static/slight loss. 237.0 237.0 10/1/2023 04:45 10/1/2023 07:30 2.75 PROD1, DRILL BHAH T LD BHA. 237.0 0.0 10/1/2023 07:30 10/1/2023 08:00 0.50 PROD1, DRILL CLEN T Clean and clear rig floor. Retrieve wear bushing. 237.0 0.0 10/1/2023 08:00 10/1/2023 15:00 7.00 PROD1, DRILL RGRP T Change out Annular element. Monitor hole with injection line. 0.0 0.0 10/1/2023 15:00 10/1/2023 20:00 5.00 PROD1, DRILL MPDA T RU MPD and lines. Test to 250/1800 PSI f/ 5 min each. Good test. 0.0 0.0 10/1/2023 20:00 10/2/2023 00:00 4.00 PROD1, DRILL BOPE T Test BOPE to 250/3500 PSI for 5/10 min ea. 4" Test joint- annular/UPR/C/M valves 1,2 & 5-15. UPR/LWR IBOP/5" Dart valve/#1 FOSV/Manual/HCR kill/ 4" kill on floor. Test PVT gain/loss and flow out alarms. Tets LEL and H2S alarms. BLM waived witness 9/29/2023 @ 19:42 hrs. per email by Allie Schoessler 0.0 0.0 10/2/2023 00:00 10/2/2023 04:30 4.50 PROD1, DRILL BOPE T Test BOPE to 250/3500 PSI for 5/10 min ea. 4" Test joint- LPR. 5.5" test joint - Annular/UPR/LPR/Remaining choke valves/Manual and super choke/Manual kills and HCRs/4" FOSV #1 & #2/5" FOSV #1 & #@/ 5" Dart valve/ Blind/Shear rams. Perform KOOMEY drawdown, ACC = 3050 PSI. MANIF. = 1500 PSI. ACC = 1600 PSI After all functions on bottles, 14 sec for 200 psi. Build W/ 2 Elec. pumps, 112 sec T/ Build full system. Pressure W/ 2 Elec. & 2 Air pumps, Closing times, Annular = 28 sec. UPR = 14 sec. Blind / Shears = 14 sec. LPR = 14 sec. Choke HCR = 2 sec. Kill HCR = 2 sec; BLM waived witness 9/29/2023 @ 19:42 hrs. per email by Allie Schoessler 0.0 0.0 10/2/2023 04:30 10/2/2023 06:30 2.00 PROD1, DRILL RURD T RD test equipment. Drain stack and pull test plug. Instal 8.75" wear bushing. Stage BHA to rig floor. 0.0 0.0 10/2/2023 06:30 10/2/2023 12:00 5.50 PROD1, DRILL BHAH T MU and RIH w/ 6 5/16" x 6 1/8" production BHA. 0.0 238.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 37/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/2/2023 12:00 10/2/2023 16:30 4.50 PROD1, DRILL TRIP T RIH w/ BHA f/ 238' to 2700' w/ doubles from pipeshed. Culling bad joints as needed. 238.0 2,700.0 10/2/2023 16:30 10/2/2023 17:00 0.50 PROD1, DRILL CIRC T Perform shallow test. Good. 2,700.0 2,700.0 10/2/2023 17:00 10/2/2023 23:30 6.50 PROD1, DRILL TRIP T RIH w/ BHA f/ 2700' to 6484' w/ doubles from pipeshed. Culling bad joints as needed. 2,700.0 6,484.0 10/2/2023 23:30 10/3/2023 00:00 0.50 PROD1, DRILL TRIP T RIH w/ BHA f/ 6484' to 6865'. 6,484.0 6,865.0 10/3/2023 00:00 10/3/2023 06:45 6.75 PROD1, DRILL TRIP T F/6,868' MD T/15,286'MD RIH W/4" DP out of derrick, inspecting hard bands & checking connection TQ. every 10 STDS, Fill pipe every 25 STDS, 173K PUW 133K SOW, 6,865.0 15,286.0 10/3/2023 06:45 10/3/2023 07:45 1.00 PROD1, DRILL TRIP T Cut & Slip 95' Drill line 15,286.0 15,286.0 10/3/2023 07:45 10/3/2023 08:00 0.25 PROD1, DRILL TRIP T Calibrate Amphion Block Height, Hook Load, Set COM 15,286.0 15,286.0 10/3/2023 08:00 10/3/2023 10:15 2.25 PROD1, DRILL TRIP T F/15,286'MD T/18,029'MD RIH W/4" DP out of Derrick, Inspecting Hard Bands, Fill Pipe Every 25 STDs, 173K PUW 133K SOW, 15,286.0 18,029.0 10/3/2023 10:15 10/3/2023 11:15 1.00 PROD1, DRILL TRIP T Retrieve trip nipple & Install 5" RCD Element as Per Beyond Rep, Line up pump across top of hole 18,029.0 18,029.0 10/3/2023 11:15 10/3/2023 18:30 7.25 PROD1, DRILL TRIP T RIH W/5" DP f/ 18029' to 24540' out of derrick, inspectiong hard bands, fill pipe every 25 Stds. 18,029.0 24,540.0 10/3/2023 18:30 10/3/2023 20:00 1.50 PROD1, DRILL WASH T Wash down f/ 24540' to 24785'. 240 GPM 1700PSI 24,540.0 24,785.0 10/3/2023 20:00 10/4/2023 00:00 4.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 24785' MD to 25197' MD / 8157' TVD. Closing chokes on connections. 0 PSI build up. (Observed losses @ 25048'. Start adding background LCM). 8-17k WOB-240 GPM 1700 PSI 100 RPM 18k TQ 9.9ppg ECD 230k PU k SO 170k ROT 24,785.0 25,197.0 10/4/2023 00:00 10/4/2023 01:00 1.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 25197' MD to 25295' MD / 8157' TVD. (Pump 80 BBLS of 35ppb LCM pill while drilling std down) 17k WOB 240 GPM 1468 PSI 100 RPM 18k TQ 9.8ppg ECD 230k PU k SO 170k ROT 25,197.0 25,295.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 38/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/4/2023 01:00 10/4/2023 02:30 1.50 PROD1, DRILL CIRC T Slow pump rate to turn off smart tools while LCM passes through BHA. 90 GPM 615 PSI 80 RPM 14k TQ 133 BPH loss rate. 25,295.0 25,295.0 10/4/2023 02:30 10/4/2023 04:30 2.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 25295' MD to 25478' MD / 8157' TVD. (Pump 90 BBLS of 35ppb LCM pill while drilling 2nd std down) 17k WOB 240 GPM 1468 PSI 100 RPM 18k TQ 9.8ppg ECD 230k PU k SO 170k ROT 25,295.0 25,478.0 10/4/2023 04:30 10/4/2023 06:30 2.00 PROD1, DRILL CIRC T Slow pump rate to turn off smart tools while LCM passes through BHA. 90 GPM 615 PSI 80 RPM 14k TQ 133 BPH loss rate. 25,478.0 25,478.0 10/4/2023 06:30 10/4/2023 08:00 1.50 PROD1, DRILL CIRC T Drop well commander opening ball and pump down. Opened at 1866 PSI. 25,478.0 25,478.0 10/4/2023 08:00 10/4/2023 12:00 4.00 PROD1, DRILL CIRC T Drop well commander isolation ball and pump down. At 2500 stks pumped 100 BBLs of 115 ppb LCM pill. chase with 15 BBLs FW. 205 GPM 900 PSI 10 RPM 12k TQ 112 BPH loss rate. 25,478.0 25,478.0 10/4/2023 12:00 10/4/2023 14:30 2.50 PROD1, DRILL SMPD T SOOH f/ 25478' to 24066'. Using MPD to overcome swab (80PSI). 25,478.0 24,066.0 10/4/2023 14:30 10/4/2023 15:30 1.00 PROD1, DRILL CIRC T Drop 1.75" closing ball and close well commander. Shifted at 1620 PSI. Stage up to drilling rate. Losses 75-100 BPH. 24,066.0 24,066.0 10/4/2023 15:30 10/4/2023 20:00 4.50 PROD1, DRILL CIRC T Wash/ream back to bottom. 200 GPM 1380 PSI 80 RPM 14k TQ 24,066.0 25,478.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 39/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/4/2023 20:00 10/5/2023 00:00 4.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 25478' MD to 25856' MD / 8141' TVD. Monitoring losses. Adding background LCM. (Closing choke on connections 0- 40PSI buildup). 12k WOB 200 GPM 1500 PSI 100 RPM 19k TQ 9.9ppg ECD 250k PU 188k ROT 90-120 BPH losses 25,478.0 25,856.0 10/5/2023 00:00 10/5/2023 06:00 6.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 25856' MD to 26464' MD / 8121' TVD. Monitoring losses. Adding background LCM. (Closing choke on connections 0- 30PSI buildup). 12k WOB 200 GPM 1546 PSI 120 RPM 21k TQ 10.1ppg ECD 238k PU 180k ROT 100 BPH losses 25,856.0 26,464.0 10/5/2023 06:00 10/5/2023 12:00 6.00 PROD1, DRILL DDRL P Drill 6 5 1/6" x 6 1/8" production section f/ 26464' MD to 26989' MD / 8118' TVD. TD section. Monitoring losses. (Closing choke on connections 0-10PSI buildup). 12k WOB 200 GPM 1500 PSI 100 RPM 21k TQ 10.1ppg ECD 250k PU 188k ROT 100 BPH losses 26,464.0 26,989.0 10/5/2023 12:00 10/5/2023 20:00 8.00 PROD1, TRIPCAS CIRC P Circulate BU x 2 reciprocating DS. Pumped 80 bbls of 35ppb LCM pill. 200 GPM 80 RPM 15k TQ 26,989.0 26,989.0 10/5/2023 20:00 10/5/2023 20:30 0.50 PROD1, TRIPCAS OWFF P Attempt to fingerprint well. No pressure buildup. Flow check. 12 BPH loss rate. 26,989.0 26,989.0 10/5/2023 20:30 10/6/2023 00:00 3.50 PROD1, TRIPCAS CIRC P Circulate hole clean. Rack back std every 2 BU. 190 GPM 1350 PSI 100 RPM 15k TQ 26,989.0 26,989.0 10/6/2023 00:00 10/6/2023 11:00 11.00 PROD1, TRIPCAS CIRC P Circulate hole clean. Rack back std every 2 BU. 190 GPM 1350 PSI 100 RPM 15k TQ 26,989.0 26,989.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 40/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/6/2023 11:00 10/6/2023 19:00 8.00 PROD1, TRIPCAS DISP P Pump 80 bbls Hi Vis spacer. Displace to 8.8ppg Vis Brine. 180 GPM 1010 PSI 110 RPM 15k TQ 26,989.0 26,989.0 10/6/2023 19:00 10/6/2023 20:00 1.00 PROD1, TRIPCAS OWFF P Flow check. Slight losses. Static loss rate 12 BPH. 26,989.0 26,989.0 10/6/2023 20:00 10/7/2023 00:00 4.00 PROD1, TRIPCAS SMPD P SOOH f/ 26989' to 24300'. Using MPD to overcome swab. 26,989.0 24,300.0 10/7/2023 00:00 10/7/2023 07:30 7.50 PROD1, TRIPCAS SMPD P SOOH to 4" DP to 18020'. Using MPD to overcome swab. 24,300.0 18,020.0 10/7/2023 07:30 10/7/2023 08:15 0.75 PROD1, TRIPCAS MPDA P Flow check. Retrieve 5" RCD bearing assembly and Install 4" RCD bearing assembly. 18,020.0 18,020.0 10/7/2023 08:15 10/7/2023 11:30 3.25 PROD1, TRIPCAS SMPD P SOOH to shoe @ 15526. Using MPD to overcome swab. 18,020.0 15,526.0 10/7/2023 11:30 10/7/2023 13:30 2.00 PROD1, TRIPCAS CIRC P Flow check. Circulate liner volume. Drop WC opening ball. 15,500.0 15,500.0 10/7/2023 13:30 10/7/2023 14:00 0.50 PROD1, TRIPCAS SVRG P Service rig. 15,500.0 15,500.0 10/7/2023 14:00 10/7/2023 19:00 5.00 PROD1, TRIPCAS SMPD P SOOH. LD 4" DP to 13533'. 15,500.0 13,533.0 10/7/2023 19:00 10/7/2023 20:00 1.00 PROD1, TRIPCAS MPDA P Flow check. Retrieve 5" RCD bearing assembly and install trip nipple 13,533.0 13,533.0 10/7/2023 20:00 10/7/2023 22:30 2.50 PROD1, TRIPCAS CIRC P Open well commander. Circulate hole clean. Drop WC closing ball. 13,533.0 13,533.0 10/7/2023 22:30 10/7/2023 23:30 1.00 PROD1, TRIPCAS PULD P POOH LD 4" DP f/ 13533' to 13022'. 13,533.0 13,022.0 10/7/2023 23:30 10/8/2023 00:00 0.50 PROD1, TRIPCAS CIRC P Close WC. Pump slug. 13,022.0 13,022.0 10/8/2023 00:00 10/8/2023 04:00 4.00 PROD1, TRIPCAS PULD P POOH LD 4" DP f/ 13022' to 10421'. 13,022.0 10,421.0 10/8/2023 04:00 10/8/2023 04:30 0.50 PROD1, TRIPCAS SVRG P Service rig. 10,421.0 10,421.0 10/8/2023 04:30 10/8/2023 05:00 0.50 PROD1, TRIPCAS RGRP T Repair hydraulic hose on pipe skate. 10,421.0 10,421.0 10/8/2023 05:00 10/8/2023 13:00 8.00 PROD1, TRIPCAS PULD P POOH LD 4" DP f/ 10421' to 4400'. 10,421.0 4,400.0 10/8/2023 13:00 10/8/2023 18:00 5.00 PROD1, TRIPCAS SLPC P Strip RCD bearings off of 5" and 4" DP. MU side entry assembly. Slip/Cut drill line. SimOPs: Replace motor on pipe skate. 4,400.0 4,400.0 10/8/2023 18:00 10/9/2023 00:00 6.00 PROD1, TRIPCAS PULD P POOH LD 4" DP f/ 4400' to 1200'. 4,400.0 1,200.0 10/9/2023 00:00 10/9/2023 02:30 2.50 PROD1, TRIPCAS PULD P POOH LD 4" DP f/ 1200' to 238'. 1,200.0 238.0 10/9/2023 02:30 10/9/2023 04:30 2.00 PROD1, TRIPCAS BHAH P Flow check. LD BHA. 238.0 0.0 10/9/2023 04:30 10/9/2023 05:30 1.00 COMPZN, CASING CLEN P Clean and clear rig floor. 0.0 0.0 10/9/2023 05:30 10/9/2023 06:00 0.50 COMPZN, CASING RURD P RU to run lower completion. 0.0 0.0 10/9/2023 06:00 10/9/2023 17:30 11.50 COMPZN, CASING PUTB P PU shoe track. Visually inspect. RIH w/ 4 1/2" L-80 12.6 # H563 liner to 11601'. MU TQ - 5600 ft/lbs. 0.0 11,601.0 10/9/2023 17:30 10/9/2023 18:15 0.75 COMPZN, CASING PUTB P MU liner hanger/packer and RIH. 11,601.0 11,642.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 41/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/9/2023 18:15 10/10/2023 00:00 5.75 COMPZN, CASING RUNL P RIH w/ liner on DP f/ 11642' to 17400'. Fill pipe w/ fill up hose every 25 stds. Parameters @ 15517': 129k PU 111k SO 120k ROT 4k TQ @ 20 RPM 11,642.0 17,400.0 10/10/2023 00:00 10/10/2023 06:00 6.00 COMPZN, CASING RUNL P RIH w/ liner on DP f/ 17400' to 26989'. Fill pipe w/ fill up hose every 25 stds. Tag bottom with 5k. 17,400.0 26,989.0 10/10/2023 06:00 10/10/2023 06:45 0.75 COMPZN, CASING RURD P LD single. MU side entry sub assembly and cement line. Shear Vertice sub @ 1570 PSI. Fill liner w/ 176bbls of fluid while venting air through top drive. 26,989.0 26,984.0 10/10/2023 06:45 10/10/2023 07:15 0.50 COMPZN, CASING CIRC P Line up and circulate through top drive. 4-6 BPM 1485 strokes. 26,984.0 26,984.0 10/10/2023 07:15 10/10/2023 09:30 2.25 COMPZN, CASING PACK P Drop 1.5" ball and set liner hanger and packer as per Baker rep. Observed shear at 4461 PSI.(used test pump). 26984' Shoe depth 15351.69' TOL 26,984.0 26,984.0 10/10/2023 09:30 10/10/2023 10:30 1.00 COMPZN, CASING PRTS P Line up and test packer to 3500 PSI. Charted. PU out of liner with running tool and LD SES assembly and double. 26,984.0 26,984.0 10/10/2023 10:30 10/10/2023 13:30 3.00 COMPZN, CASING CIRC P Displace well to 8.8ppg CI brine. 26,984.0 26,984.0 10/10/2023 13:30 10/10/2023 14:00 0.50 COMPZN, CASING OWFF P Flow check. Static loss rate- 21 BPH 26,984.0 26,984.0 10/10/2023 14:00 10/10/2023 21:45 7.75 COMPZN, WELLPR PULD P POOH LD DP f/ 15352' to 12174'. 15,352.0 12,174.0 10/10/2023 21:45 10/10/2023 22:15 0.50 COMPZN, WELLPR SVRG P Service rig. SimOps: Replace hose on pipe skate. 12,174.0 12,174.0 10/10/2023 22:15 10/11/2023 00:00 1.75 COMPZN, WELLPR PULD P POOH LD DP f/ 12174' to 11379'. 12,174.0 11,379.0 10/11/2023 00:00 10/11/2023 06:00 6.00 COMPZN, WELLPR PULD P POOH L/D 5" Drill pipe from 11,379' MD to 5,600' MD. 11,379.0 5,600.0 10/11/2023 06:00 10/11/2023 09:30 3.50 COMPZN, WELLPR PULD P POOH LD 5" drill pipe from 5,600' MD to 2,505' MD. 57 joints 5" drill pipe bad. Total bad 5" joints on location 127 joints. 5,600.0 2,505.0 10/11/2023 09:30 10/11/2023 10:15 0.75 COMPZN, WELLPR PULD P POOH LD 4" drill pipe from 2,505' MD to 2,225' MD. 2,505.0 2,225.0 10/11/2023 10:15 10/11/2023 10:45 0.50 COMPZN, WELLPR SVRG P Service rig, 2,225.0 2,225.0 10/11/2023 10:45 10/11/2023 12:00 1.25 COMPZN, WELLPR PULD P POOH LD 4" drill pipe from 2,225' MD to 1,570' MD. 2,225.0 1,570.0 10/11/2023 12:00 10/11/2023 16:00 4.00 COMPZN, WELLPR PULD P POOH LD 4" drill pipe from 1,570' MD to Surface. L/D liner running tools. Witnessed good shear on dog sub. Total bad 4" joints on location 140 joints. Total bad 4" joints HWT on location 11 joints. 1,570.0 0.0 10/11/2023 16:00 10/11/2023 16:30 0.50 COMPZN, WELLPR WWWH P R/U stack washer and wash stack with 600gpm 120psi 10rpms. 0.0 0.0 10/11/2023 16:30 10/11/2023 19:00 2.50 COMPZN, RPCOMP RURD P Clean and clear rig floor, Stage tree on BOP deck, R/U to run upper completion. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 42/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/11/2023 19:00 10/11/2023 19:30 0.50 COMPZN, RPCOMP PUTB P P/U 4.5" 12.6ppf 563 upper completion to 131' MD 0.0 131.0 10/11/2023 19:30 10/11/2023 20:00 0.50 COMPZN, RPCOMP PRTS P Make up gauge mandrel and install TEC line and test to 9,500psi 10min. 131.0 131.0 10/11/2023 20:00 10/11/2023 23:00 3.00 COMPZN, RPCOMP PUTB P P/U 4.5" 12.6ppf 563 upper completion from 131' MD to 2,105' MD. 131.0 2,105.0 10/11/2023 23:00 10/11/2023 23:30 0.50 COMPZN, RPCOMP PUTB P Make up 5.5" X/O and change out handling equipment. 2,105.0 2,105.0 10/11/2023 23:30 10/12/2023 00:00 0.50 COMPZN, RPCOMP PUTB P P/U 5.5" 15.5ppf 563 upper completion from 2,105' MD to 2,516' MD. 2,105.0 2,516.0 10/12/2023 00:00 10/12/2023 06:00 6.00 COMPZN, RPCOMP PUTB P P/U 5.5" 15.5ppf 563 upper completion from 2,516' MD to 7,340' MD. 2,516.0 7,340.0 10/12/2023 06:00 10/12/2023 12:00 6.00 COMPZN, RPCOMP PUTB P P/U 5.5" 15.5ppf 563 upper completion from 7,340' MD to 12,050' MD. 7,340.0 12,050.0 10/12/2023 12:00 10/12/2023 18:00 6.00 COMPZN, RPCOMP PUTB P P/U 5.5" 15.5ppf 563 upper completion from 12,050' MD to 15,323' MD. Running TEC line and installing Cannon clamps every joint. Checking control line every 1000' MD. Tag up, witness 20k shear, SO 1' to NoGo with 10k @ 15,354' MD. Calculate spaceout and M/U pups (14.85', 9.67', 5.92') PU: 184k SO: 127k 12,050.0 15,351.0 10/12/2023 18:00 10/12/2023 20:30 2.50 COMPZN, RPCOMP THGR P MU hanger and landing joint. Terminate line through hanger and test to 5000psi. Good test. Land hanger at 15,351' MD with 126k. RILD. Clean and clear rig floor and R/U test equipment. 15,351.0 15,351.0 10/12/2023 20:30 10/12/2023 21:00 0.50 COMPZN, RPCOMP PRTS P Close annular and test hanger seals to 3000psi 10min (good test) 15,351.0 15,351.0 10/12/2023 21:00 10/12/2023 23:30 2.50 COMPZN, RPCOMP PRTS P RU test lines. Pressure up tubing to 3000psi (15min), set pkr and test tbg to 4,200 & hold for 30 minutes (witness second shear at 2230psi). Bleed tubing down to 3,000 psi & bring pressure on IA to 3,500 psi & hold pressure for 30 minutes Bleed tubing to 0 psi, Shear SOV at 2200psi diff. Tubing & IA equalized & bled to 0 psi Observed IA for flow for 30 minutes, No flow 15,351.0 15,351.0 10/12/2023 23:30 10/13/2023 00:00 0.50 COMPZN, RPCOMP RURD P R/D test equipment and L/D landing joint. Drain BOP's. 15,351.0 15,351.0 10/13/2023 00:00 10/13/2023 01:00 1.00 COMPZN, WHDBOP PRTS P Set BPV and test to 3000psi (10 min) in direction of flow. 15,351.0 0.0 10/13/2023 01:00 10/13/2023 02:00 1.00 COMPZN, WHDBOP RURD P Blow down service lines, Clean and clear rig floor, De-energize Koomey, R/D Orbit valve, clean flow box. 0.0 0.0 10/13/2023 02:00 10/13/2023 04:30 2.50 COMPZN, WHDBOP NUND P R/D choke and kill lines, Pull and L/D mouse hole, Remove trip nipple, Break bolts on stack, Skid flow box back and remove MPD head. 0.0 0.0 10/13/2023 04:30 10/13/2023 06:00 1.50 COMPZN, WHDBOP NUND P Skid BOPs back and N/D risers. 0.0 0.0 10/13/2023 06:00 10/13/2023 10:30 4.50 COMPZN, WHDBOP NUND P Complete control line termination at WH. NU adapter flange. Test to 5,000psi 10min. Witness by CPAI BHP 4313.9 psi Temp 177.9 0.0 0.0 10/13/2023 10:30 10/13/2023 12:00 1.50 COMPZN, WHDBOP RURD P Blow down service lines and R/D equipment, Pull BPV, R/U for freeze protect. 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 43/43 MT7-94 Report Printed: 11/6/2023 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/13/2023 12:00 10/13/2023 14:15 2.25 COMPZN, WHDBOP FRZP P Pressure test lines to 3500psi. Pump 85bbls diesel down IA taking returns up TBG with LRS. 0.0 0.0 10/13/2023 14:15 10/13/2023 15:15 1.00 COMPZN, WHDBOP OTHR P Open well and let U-TUB 1 hr. Final Pressures OA 0psi IA 0psi TBG 150psi 0.0 0.0 10/13/2023 15:15 10/13/2023 16:30 1.25 COMPZN, WHDBOP PRTS P Bled tubing to 0psi, Install BPV and test in direction of flow to 3500psi 10min 0.0 0.0 10/13/2023 16:30 10/13/2023 18:00 1.50 DEMOB, MOVE RURD P Blow down service lines, M/U gauge flanges and secure well. Rig release at 1800hrs 10-13-23 0.0 0.0 Rig: DOYON 25 RIG RELEASE DATE 10/13/2023 Page 1/1 MT7-94 Report Printed: 11/6/2023 Cement Detail Report Cement Details Description Surface String Cement Cementing Start Date 8/27/2002 20:30 Cementing End Date 8/28/2023 01:30 Wellbore Name MT7-94 Comment Cement Stages Stage # 1 Description Surface String Cement Objective Returns to surface Top Depth (ftKB) 39.2 Bottom Depth (ftKB) 4,096.0 Full Return? Yes Vol Cement … 198.0 Top Plug? Yes Btm Plug? Yes Q Pump Init (bbl/m… 5 Q Pump Final (bbl/… 3 Q Pump Avg (bbl/… 5 P Pump Final (psi) 776.0 P Plug Bump (psi) 411.0 Recip? Yes Stroke (ft) 10.00 Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Bumped 4.6 bbl's over calculated pressured up to 500 psi over held for 5 minutes. Bled pressure off and checked floats held. Cement Fluids & Additives Fluid Fluid Type Lead Cement Fluid Description Estimated Top (ftKB) 39.2 Est Btm (ftKB) 3,586.0 Amount (sacks) 1,341 Class Blend Volume Pumped (bbl) 456.0 Yield (ft³/sack) 1.91 Mix H20 Ratio (gal/sa… 6.68 Free Water (%) Density (lb/gal) 11.00 Plastic Viscosity (cP) 223.0 Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Fluid Fluid Type Tail Cement Fluid Description Estimated Top (ftKB) 3,586.0 Est Btm (ftKB) 4,096.0 Amount (sacks) 338 Class G Volume Pumped (bbl) 70.0 Yield (ft³/sack) 1.16 Mix H20 Ratio (gal/sa… 5.05 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) 189.0 Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Surface String Cement Job: DRILLING ORIGINAL-<jobsubtyp> 8/22/2… Page 1/1 MT7-94 Report Printed: 11/6/2023 Cement Detail Report Cement Details Description Intermediate String 1 Cement Cementing Start Date 9/17/2023 16:15 Cementing End Date 9/17/2023 21:45 Wellbore Name MT7-94 Comment Cement Stages Stage # 1 Description Primary – Full Bore Objective Mud Push Top Depth (ftKB) 7,217.0 Bottom Depth (ftKB) 8,044.0 Full Return? Yes Vol Cement …Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 3 Q Pump Final (bbl/… 3 Q Pump Avg (bbl/… 3 P Pump Final (psi) 279.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Pump 63.9 bbls 12.5ppg mud push Cement Fluids & Additives Fluid Fluid Type MUD PUSH 12.5ppg Fluid Description Estimated Top (ftKB) 7,217.0 Est Btm (ftKB) 8,044.0 Amount (sacks) Class Blend Volume Pumped (bbl) 63.9 Yield (ft³/sack)Mix H20 Ratio (gal/sa…Free Water (%) Density (lb/gal) 12.50 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Stage # 2 Description Primary – Full Bore Objective Lead Cement 13.0ppg Top Depth (ftKB) 8,044.0 Bottom Depth (ftKB) 11,549.0 Full Return? Yes Vol Cement …Top Plug? No Btm Plug? Yes Q Pump Init (bbl/m… 5 Q Pump Final (bbl/… 5 Q Pump Avg (bbl/… 5 P Pump Final (psi) 146.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Pumped 254.2 bbls lead cement Cement Fluids & Additives Fluid Fluid Type Lead Cement Fluid Description Estimated Top (ftKB) 8,044.0 Est Btm (ftKB) 11,549.0 Amount (sacks) 747 Class G Volume Pumped (bbl) 254.2 Yield (ft³/sack) 1.91 Mix H20 Ratio (gal/sa… 10.27 Free Water (%) Density (lb/gal) 13.00 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Stage # 3 Description Primary – Full Bore Objective Tail Cement 15.8ppg Top Depth (ftKB) 11,549.0 Bottom Depth (ftKB) 13,561.0 Full Return? Yes Vol Cement …Top Plug? Yes Btm Plug? No Q Pump Init (bbl/m… 4 Q Pump Final (bbl/… 4 Q Pump Avg (bbl/… 4 P Pump Final (psi) 540.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Pumped 152 bbls tail cement Cement Fluids & Additives Fluid Fluid Type Tail Cement Fluid Description Estimated Top (ftKB) 11,549.0 Est Btm (ftKB) 13,561.0 Amount (sacks) 734 Class G Volume Pumped (bbl) 152.0 Yield (ft³/sack) 1.91 Mix H20 Ratio (gal/sa… 4.99 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Intermediate String 1 Cement Job: DRILLING ORIGINAL-<jobsubtyp> 8/22/2… Page 1/1 MT7-94 Report Printed: 11/6/2023 Cement Detail Report Cement Details Description Intermediate String 2 Cement Cementing Start Date 9/21/2023 19:00 Cementing End Date 9/21/2023 21:30 Wellbore Name MT7-94 Comment Flood lines and test to 4700 PSI. Pump 70BBLS of 8.9ppg KCL Chem Wash. 126 GPM/715 PSI. Drop bottom dart. Swap to cementers. Pump 77.2 BBLS of 15.8ppg cement @ 4-4.5 BPM. SD and drop top dart. Pump 10 BBLS FW w/ cement unit. Swap to rig pumps and displace at 6 BPM 600-850 PSI. Slow rate to 3 BPM and bump plug. Pressure up to 500 PSI over FCP to 1000 PSI. Hold f/ 5 minutes and check floats. Good. 1.3 BBLs bled back. Full returns throughout job. No losses. Cement in place @ 21:30hrs 9/21/23 Cement Stages Stage # 1 Description Liner Cement Objective Top Depth (ftKB) 14,658.0 Bottom Depth (ftKB) 15,526.0 Full Return? No Vol Cement … 0.0 Top Plug? Yes Btm Plug? Yes Q Pump Init (bbl/m… 4 Q Pump Final (bbl/… 2 Q Pump Avg (bbl/… 3 P Pump Final (psi) 453.0 P Plug Bump (psi) 1,000.0 Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Tail Cement Fluid Description Estimated Top (ftKB) 11,130.0 Est Btm (ftKB) 11,888.0 Amount (sacks) 606 Class G Volume Pumped (bbl) 128.0 Yield (ft³/sack) 1.16 Mix H20 Ratio (gal/sa… 4.75 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Intermediate String 2 Cement Job: DRILLING ORIGINAL-<jobsubtyp> 8/22/2…              !"# $ % &$ "#'() * + , &+ -&'$&    + #.    +  +              +  +  !"  !" &&" $+  ##    $% &'()*!+,-  /+ !" &&& +.) /  "    +$% &'()*!+,-     +  !"   "&   ,+ !  &,+ *  "& 0 +   , &,+0  )!1.2%   3 )!14403    5  /50     /6-" 7 0 8  %  0 88 % %%     -/$ + -&$ + 1& /+ /+   213' 23'  4 &       !$-  +  !"     -+-- -+-- $5!)$5,!-+9 !-5)*+, )--+9-  &$1 &+  -+-- -:)-;"+$)* )$):");+-,"  & 567 8 $ / 5#7 &,   &  / 567  !" "$ &, "&/  '-* <)<-* )*+!! ,-+*9 $5-!,+9 & +.  + $ + / !" )+- 07 . & + 8,5#. 7 5 7 23' 5 7   567 213' 5 7 #  +*!+- *)$+!*-+---+--*!+- 8, 5 7  /&,  #&,  5  7 # 5 7 & )-<)<-*    =>& >& =&    & ?)+))-$+"9 !,+  @)1 !"3 ,<$<-*,A")A-  B=CBB 4  B=CB8B    % )5-"*+,$ 5*+9,  @1 !"3 ,<$<-*,A$-A-  B=CBB 4  B=CB8B    % 5*9+$" "5-)+,$  @*1 !"3 ,<9<-*)A-"  B=CBB 4  B=CB8B    % "5))*+!! )-5,!,+**  @"1 !"3 !<$<-*A*A--  B=CBB 4  B=CB8B    % )-5!,"+9 )*5$"+-  @$1 !"3 !<)<-*,A*-A-  B=CBB 4  B=CB8B    % )*59)+-$ )$5$-)+!  @91 !"3 !<)<-*A$9A-  B=CBB 4  B=CB8B    % )$5$+-" "59!+)$  @1 !"3 !<9<-*))A9A  B=CBB 4  B=CB8B    % "5,!+*) 95!9+,"  @,1 !"3 )-<$<-*,A",A- " 5 7 9 567 % 567 213' 5 7 23' 5 7   #. 5 7 #.  5 7 "&  / 5 7 "&  1& / 5 7 . &   5 7 - 563:7  #&, *!+- -+-- -+-- *!+- -+-- -+-- )--+9- $5!)$5,!-+9 !-5)*+, -+-- -+-- 0.C=. )-$+"9 -+*$ ))-+" )-$+"9 -+- -+)! *"+*" $5!)$5,!-+)! !-5)*+! -+$* -+), =>& >&1)3 -)+$$ -+"" )-$+) -)+$$ -+ -+,9)+$ $5!)$5,,!+! !-5)**+$! -+)- -+ =>& >&1)3 *+)$ -+"" )-$+, *+)$ -+** )+-$!+*$ $5!)$5,,!+!- !-5)**+, -+- -+! =>& >&1)3 *+)9 -+! **-+) *+)$ -+9 )+--),+*$ $5!)$5,!-+$- !-5)**+, )+*! -+$- =>& >&1)3 ")"+!- +9" *"+," ")"+,$ +$9 -+$"$+-$ $5!)$5,!+," !-5)*+*) )+!) +) =>& >&1)3 $))+-) "+*) *"+)" $)-+, +*- *+!**-+!, $5!)$5,!+9 !-5)!+-9 )+" +! =>& >&1)3 9-$+") 9+) *)+9, 9-"+, )"+)$ !+)$"9"+!, $5!)$5!-"+99 !-5)"+- )+!, )9+$* =>& >&1)3      * + , &+ -&'$&    + #.    +  +              +  +  !"  !" &&" $+  ##    $% &'()*!+,-  /+ !" &&& +.) /  "    +$% &'()*!+,-     +  !"   " 5 7 9 567 % 567 213' 5 7 23' 5 7   #. 5 7 #.  5 7 "&  / 5 7 "&  1& / 5 7 . &   5 7 - 563:7  #&, --+-" ,+-) *)+9, 9!,+9, *+* )9+*!$$,+,, $5!)$5!)"+- !-5))+-" )+!" ,+)$ =>& >&1)3 !*+)9 !+ *)9+9 !-+9, *"+)9 $+,*9$-+,, $5!)$5!$+)* !-5)-+!) +-9 "+$) =>& >&1)3 ,,+9 ))+) *)+,! ,,*+- "9+$ *,+-""*+!- $5!)$5!*+$" !-5-!9+-" )+99 $!+9! =>& >&1)3 !,+ )+! *-!+* !9+)* $!+* $+,,,*9+** $5!)$5!$-+!" !-5-,)+$ )+!, !+** =>& >&1)3 )5-"*+,$ )"+-- *)-+* )5-*9+- 9,+"" 9*+,9,!9+ $5!)$5!9-+"$ !-5--+,$ )+9 !*+$!  B=CBB13 )5)-*+), )$+) *-,+*) )5-!*+"* +,! $+"*!$*+9* $5!)$5!-+) !-5-$!+$" +)* )-,+"*  B=CBB13 )5)!$+$ )9+$! *-,+9, )5),+*- !*+9* !$+))5-"+$- $5!)$5!,9+"! !-5-"-+- )+$" )**+"!  B=CBB13 )5,!+, ),+9 *-,+!! )5+) )))+$ ))+")5)*+* $5!)95--"+!! !-5-),+$- +)$ )9)+,-  B=CBB13 )5*,*+, -+9 *)-+,9 )5*9-+9 )*)+,9 )")+9!)5-+, $5!)95-$+!! ,!5!!"+,) +* )!*+!  B=CBB13 )5",+$! *+$ *))+*" )5"",+*! )$$+*$ )9,+9))5*-,+$! $5!)95-$-+* ,!5!9,+$$ +! ,+!-  B=CBB13 )5$*+)9 9+- *-,+") )5$*"+) ),-+, )!!+))5*!"+* $5!)95-9+$* ,!5!*,+) *+- 9,+"$  B=CBB13 )599,+$* !+- *-"+,$ )59),+99 -+)$ *"+9!)5",+,9 $5!)95)-*+,* ,!5!-*+!* *+" *)+-  B=CBB13 )59)+," *-+$* *-+"" )59!!+9* *+, *+*-)5$$!+,* $5!)95)*-+$9 ,!5,99+-$ +- *$+*  B=CBB13 )5,$"+"9 *+"! *--+!* )5,+$! $,+ *)"+$-)59*,+! $5!)95)$+)- ,!5,$+$, +, "-"+,  B=CBB13 )5!"!+) *$+9 *--+9 )5,$+-$ ,$+*$ *9-+-9)5)+$ $5!)95),$+", ,!5,-+! *+*) "$$+"9  B=CBB13 5-"*+), *!+-, !!+" )5!*)+ *)"+-- "-!+*)5!)+! $5!)95)$+"! ,!5*+*- *+ $)-+*"  B=CBB13 5)*+, "+-! !!+$$ 5--*+9) *""+"" "9+,$)5,9*+,) $5!)95"+*! ,!59!+9, *+), $9!+"-  B=CBB13 5*+9, ""+"* !!+9 5-+) *9+* $)!+$))5!*+!) $5!)95,-+, ,!59*+!" +" 9*)+$  B=CBB13 5*9+$" "+"- !!+" 5)*,+-) "-!+*- $,+*)5!!,+) $5!)95*)$+"* ,!5$99+-9 *+)9 9!9+*  B=CBB1*3 5"-+!) $-+)! !!+), 5--+) ""*+!$ 9"-+!5-9-+* $5!)95*$)+, ,!5$-$+-, +!9 9"+*)  B=CBB1*3 5$)$+!* $+" !,+, 5$!+9, "!+,$ -$+-5))!+,, $5!)95*,!+"9 ,!5"")+* +), ,*$+)  B=CBB1*3 5$!"+!" $*+, !!+"* 5*-+- $)-+$, 9-+)5)9+"- $5!)95")+) ,!5*,+-9 +-! ,!$+9-  B=CBB1*3 59,$+-9 $9+-$ !,+! 5*$,+! $"9+$9 ,"+9-5)!+) $5!)95"$!+"9 ,!5**+- +$) !99+*  B=CBB1*3 5!+)9 $!+9) !,+!, 5"-!+-9 $,$+)" ,!"+59!+9 $5!)95"!!+!$ ,!5$$+)* *+, )5-"+")  B=CBB1*3 5,+, 9-+9$ !!+9 5"$$+"" 9"+9! !9"+95*)$+9" $5!)95$")+"" ,!5),$+,9 )+! )5))!+!  B=CBB1*3 5!9+9 9-+!$ !!+!- 5$-)+!, 999+-$ )5-*9+!*5*9+), $5!)95$,"+! ,!5))"+ -+*, )5)!!+  B=CBB1*3 *5-9)+ 9)+- !!+9 5$"+" -+-- )5)-,+*$5"-+9 $5!)959+- ,!5-""+$ -+*- )5,+,9  B=CBB1*3 *5)$9+"! 9)+, *--+$ 5$!*+-9 ",+$" )5),-+!5"$*+9 $5!)959)+ ,,5!*+9 -+"9 )5*$,+$  B=CBB1*3 *5"!+9, 9)+*- *--+)) 59*+,* ,!+9* )5$-+!"5"!,+-* $5!)95)"+$ ,,5!-"+, -+)* )5"*+")  B=CBB1*3 *5*""+$9 9)+"* *--+9 59,*+*- ,*)+$- )5*+!*5$"*+$- $5!)95$,+)- ,,5,**+"! -+- )5$)+$9  B=CBB1*3 *5"*!+, 9)+," !,+$ 5,+$" ,+9 )5*!$+!*5$,,+" $5!)95,-)+ ,,59)+99 )+99 )5$!+,,  B=CBB1*3 *5$*+!9 9+*" !+* 5+)9 !))+)) )5"9,+59*+*9 $5!)95,")+ ,,59,!+! )+*" )599+)9  B=CBB1*3 *599+$* 9*+- !9+) 5,)$+)- !",+"! )5$"+!59$+*- $5!)95,,)+)" ,,59)9+! )+) )5$"+99  B=CBB1*3 *5)+!9 9*+" !$+" 5,$,+)- !,$+$! )59)!+995),+*- $5!)95!-+*" ,,5$")+)9 -+,$ )5,*"+99  B=CBB1*3 *5,)$+** 9*+$ !$+$* 5,!!+9" )5-)+$9 )59!$+)$5$!+," $5!)95!$,+*! ,,5"99+9! -+* )5!)*+-)  B=CBB1*3 *5!-,+!$ 9"+-$ !$+", 5!"-+, )5-$+9 )5)+-*5,-)+- $5!)95!!9+9, ,,5*!)+,$ -+* )5!!)+,-  B=CBB1*3 "5--)+!9 9"+ !9+*) 5!,)+"- )5-!"+*) )5,"9+*5,")+9- $5!)5-*$+*- ,,5*)+9) -+, 5--+"  B=CBB1*3 "5-)+,$ 9"+), !9+*) 5!,,+* )5)--+9$ )5,$!+)$5,",+$ $5!)5-"+-- ,,5*-"+! -+$ 5-,*+!-  B=CBB1*3 "5))*+!! 9"+*, !+** *5-*-+-" )5)*!+* )5!*9+""5,!-+" $5!)5-,*+- ,,5,+! -+!, 5)9$+"  B=CBB1"3 "5)"+*- 9*+9! !+$$ *5-"+"* )5)$)+"9 )5!$!+-*5!-+9* $5!)5-!$+$$ ,,5-9+$* +$" 5),!+,  B=CBB1"3      * + , &+ -&'$&    + #.    +  +              +  +  !"  !" &&" $+  ##    $% &'()*!+,-  /+ !" &&& +.) /  "    +$% &'()*!+,-     +  !"   " 5 7 9 567 % 567 213' 5 7 23' 5 7   #. 5 7 #.  5 7 "&  / 5 7 "&  1& / 5 7 . &   5 7 - 563:7  #&, "5*$+$, 9*+-$ !9+-9 *5-,"+$ )5),!+-9 5-**+"$5!""+"$ $5!)5)*$+- ,,5)**+)! )+$, 59,+9$  B=CBB1"3 "5**-+, 9*+) !9+99 *5)+*" )59+$ 5)-!+$)5!,+$" $5!)5)"+!! ,,5-$,+) -+$ 5*",+9"  B=CBB1"3 "5"$+-! 9*+), !,+$ *5)9!+!" )59$+$" 5),"+)*5-*-+)" $5!)5)$+," ,5!,"+9$ )+$) 5",+""  B=CBB1"3 "5$-+" 9+,- !!+*! *5)*+)$ )5*-9+") 5$,+"$*5-*+*$ $5!)5$,+" ,5!))+$$ )+)" 5$-!+"9  B=CBB1"3 "59)"+) 9+,- !!+,) *5$9+-9 )5*"+9$ 5**)+-$*5))9+9 $5!)5*-)+!, ,5,"-+) -+"- 5$,!+$!  B=CBB1"3 "5-,+$9 9+ *-)+-$ *5!!+! )5*!-+), 5"-*+""*5)$!+"! $5!)5*"9+$- ,59,+!" )+) 59-+"!  B=CBB1"3 "5,-*+9 9+$! *--+, *5*"+! )5"**+"$ 5"$+$,*5-+!! $5!)5*!)+$ ,59!,+-* -+ 5$)+9  B=CBB1"3 "5,!+!- 9+$$ !!+! *5*,9+*! )5"$+!, 5$",+-)*5"9+$! $5!)5"*9+ ,599+,) -+,$ 5,*+-  B=CBB1"3 "5!!-+** 9+- *--+-) *5",+,! )5$)+-) 59)!+)-*5,!+-! $5!)5"!+$ ,5$$9+,! -+) 5!))+9  B=CBB1"3 $5-,9+ 9+9 !!+ *5"+! )5$$!+"! 59!*+-)*5***+) $5!)5$*+9 ,5","+- -+ 5!!*+$"  B=CBB1"3 $5),-+$ 9+9" !!+9 *5$)9+) )59--+!! 59$+)*5*9+") $5!)5$9+ ,5")+9 -+)- *5-*+!*  B=CBB1"3 $5$+-$ 9+$$ !,+,- *5$$!+ )59")+!, 5,*,+!"*5")!+! $5!)59)-+ ,5*"-+9) -+, *5)$"+*)  B=CBB1"3 $5*9,+"$ 9+$9 !,+$ *59-+ )59,)+* 5!))+9,*5"9+! $5!)59$+- ,59!+-) -+ *5**+"  B=CBB1"3 $5"9+*, 9+9* !,+) *59"9+-- )5)+! 5!,$+-,*5$-9+- $5!)59!*+9- ,5)!9+* -+*! *5*)+!$  B=CBB1"3 $5$$9+," 9+9 !+! *59,!+"- )59-+9 *5-$!+)!*5$"!+9- $5!)5*"+! ,5)*+$ -+*) *5*!+$  B=CBB1"3 $59$)+* 9+$9 !+)- *5*+,, )5!!+*) *5)**+9,*5$!*+-, $5!)5$+- ,5-$-+*9 -+99 *5"+*9  B=CBB1"3 $5"*+$ 9+$- !9+!9 *5$+") )5,*9+", *5-9+$$*59*$+9) $5!)5,)"+,, ,95!,+$9 -+)$ *5$"!+$  B=CBB1"3 $5,*,+"* 9+"! !+" *5,)!+ )5,"+!* *5,)+*!*59!+" $5!)5,$$+*! ,95!-"+,) -+"* *59!+"*  B=CBB1"3 $5!*+) 9+"! !+"$ *5,9+$" )5!)*+$ *5*$$+)*5+" $5!)5,!$+" ,95,*+-! -+-* *5-,+*)  B=CBB1"3 95-9+,$ 9+"9 !+$ *5!-9+ )5!$+- *5"!+9$*599+" $5!)5!*9+$9 ,95$,+9 -+) *5,+!*  B=CBB1"3 95))+** 9+*$ !+," *5!$-+-" )5!!-+!$ *5$-*+,*5,)-+" $5!)5!+$* ,959,$+" -+, *5,9+"9  B=CBB1"3 95)$+** 9+*" !+)* *5!!*+9 5-!+* *5$+9$*5,$*+, $5!),5-)+!, ,959)+! -+9 *5!"9+"$  B=CBB1"3 95*-!+$" 9+*! !9+!, "5-*+* 5-9+*" *59$)+!,*5,!+$ $5!),5-$+!! ,95$*!+* -+)$ "5-$+"  B=CBB1"3 95"-*+9 9+" !9+9* "5-,-+!$ 5)-"+!" *59+"-*5!")+)$ $5!),5-!+9" ,95"99+*, -+** "5)-"+-  B=CBB1"3 95"!+!, 9+"9 !9+" "5)"+9) 5)"+! *5,-)+"*5!,"+,) $5!),5)*+-9 ,95*!+9) -+- "5),*+)-  B=CBB1"3 95$!+! 9+"9 !9+,) "5)9,+"" 5)!+!9 *5,9+"-"5-,+9" $5!),5)9+! ,95*),+$ -+*9 "59+"*  B=CBB1"3 959,+"$ 9+*" !+$$ "5)+*- 5),+ *5!$)+-*"5-+$- $5!),5)+)9 ,95""+!! -+- "5*")+,9  B=CBB1"3 95,+) 9+*! !,+*, "5$9+* 5$+9 "5-$+)""5))9+"* $5!),5$,+$$ ,95)+-- -+, "5")+9!  B=CBB1"3 95,*+- 9+") !+9" "5!,+*$ 5!$+"$ "5-!9+9"5)$,+$$ $5!),5!,+** ,95)-)+!9 -+ "5"!,+**  B=CBB1"3 95!9+-$ 9+$ !+!9 "5*")+! 5**"+* "5)9!+!,"5-)+!! $5!),5**!+* ,95-!+*9 -+* "5$+$*  B=CBB1"3 5-9)+$- 9+9$ !,+) "5*,$+, 5*"+) "5"*+"5"$+", $5!),5*,)+-$ ,$5!$9+- -+ "59$+"$  B=CBB1"3 5)$$+" 9+9) !!+-) "5",+*, 5")"+*- "5*)9+9,"5,,+$, $5!),5"*+* ,$5,,"+!" -+! "5*+-*  B=CBB1"3 5"!+!) 9+9* !!+" "5")+! 5"$$+** "5*!-+-$"5**+) $5!),5"99+, ,$5,)+" -+*! "5,)+$"  B=CBB1"3 5*""+* 9+$9 !,+$ "5$)$+** 5"!9+-* "5"9*+*"5*$+$* $5!),5$-!+-- ,$5"-+ -+9* "5,!+9,  B=CBB1"3 5"*!+-" 9+- !!+! "5$$,+! 5$*9+,, "5$*9+,$"5")!+) $5!),5$$)+, ,$599,+9 -+$* "5!,+*  B=CBB1"3 5$*+!) 9+$9 !!+! "59-+- 5$+99 "59-!+$9"5"9+ $5!),5$!"+9$ ,$5$!9+ -+)$ $5-$,+))  B=CBB1"3 59+"* 9+9 !!+-* "59"$+$$ 59),+$$ "59,+,$"5$-$+$ $5!),59*+$9 ,$5$"+$! -+ $5)*,+"9  B=CBB1"3 5)+$! 9+$9 !!+-, "59,,+,9 59$!+)9 "5$$+!*"5$"!+-9 $5!),59,-+) ,$5"$+9 -+)* $5),+"  B=CBB1"3 5,)9+-, 9+9$ !,+ "5*+*" 59!!+* "5,!+*9"5$!+$" $5!),5+ ,$5*,-+*! -+*) $5!,+-  B=CBB1"3 5!-!+! 9+9! !,+), "5$+"" 5*!+$- "5!-+9,"59*$+9" $5!),59"+$$ ,$5*-,+) -+$9 $5*,+9  B=CBB1"3      * + , &+ -&'$&    + #.    +  +              +  +  !"  !" &&" $+  ##    $% &'()*!+,-  /+ !" &&& +.) /  "    +$% &'()*!+,-     +  !"   " 5 7 9 567 % 567 213' 5 7 23' 5 7   #. 5 7 #.  5 7 "&  / 5 7 "&  1& / 5 7 . &   5 7 - 563:7  #&, ,5--"+" 9+9* !+,9 "5,),+" 5,+," "5!9+9-"59,+!" $5!),5,-$+! ,$5*$+") -+*) $5"$+!"  B=CBB1"3 ,5-!,+"* 9+9" !+-$ "5,9+-* 5,)+") $5-$-+,*"5+* $5!),5,"9+$* ,$5)9+, -+9 $5$*+,  B=CBB1"3 ,5)!+*" 9+$ !+-" "5!-$+, 5,$$+*) $5)$+-,"59$+", $5!),5,,9+", ,$5-,!+) -+)* $59)9+)$  B=CBB1"3 ,5,9+") 9+9" !9+*$ "5!",+9- 5,!+, $5)!!+9,"5,-,+,- $5!),5!9+-" ,$5-)$+9- -+99 $59!"+!!  B=CBB1"3 ,5*,-+$9 9+$ !9+ "5!!)+! 5!*-+- $5"+"$"5,$+) $5!),5!9$+", ,"5!")+!- -+"- $5*+,$  B=CBB1"3 ,5""+!- 9+99 !9+"9 $5-*$+* 5!9+ $5*"!+*""5,!$+$ $5!)!5--$+-9 ,"5,9,+-, -+*) $5,$+!-  B=CBB1"3 ,5$9!+9) 9+9* !9+!! $5-,+," *5--$+$$ $5""+""5!*!+-" $5!)!5-""+!9 ,"5!"+-* -+$- $5!*+*"  B=CBB1"3 ,599"+)* 9+$9 !+) $5)+*" *5-"*+ $5"!!+-"5!,+$" $5!)!5-,$+), ,"5-+*! -+)" 95-))+"  B=CBB1"3 ,5$,+! 9+9 !+-) $5)9$+!9 *5-,+-" $5$"+)!$5-9+)9 $5!)!5)$+$9 ,"59"9+"! -+)9 95-!)+"*  B=CBB1"3 ,5,$"+-) 9+9* !+* $5-!+9* *5)-+9) $59"!+,$5-9!+,* $5!)!5)99+- ,"5$+$) -+*" 95))+*  B=CBB1"3 ,5!",+9) 9+9- !+$ $5$*+)" *5)$!+* $5*+,$5))*+*" $5!)!5-9+! ,"5"!!+- -+)" 95$)+-*  B=CBB1"3 !5-"*+* 9+$$ !+,! $5!9+9 *5)!,+") $5!,+$$5)$9+!9 $5!)!5",+)- ,"5"$+9 -+*$ 95**-+,,  B=CBB1"3 !5)*+! 9+$9 !,+9) $5*"-+- *5*+,, $5,)+)$5--+ $5!)!5,!+$! ,"5*$*+" -+9, 95")-+**  B=CBB1"3 !5*)+9" 9+9* !,+)) $5*,*+$- *5+9 $5!"$+"$5"*+- $5!)!5**)+"- ,"5,-+,$ -+", 95"!-+)!  B=CBB1"3 !5*+-" 9+9* !,+) $5"+*9 *5*)+9 95--+)*$5,+$9 $5!)!5**+" ,"5-+! -+-9 95$-+,9  B=CBB1"3 !5")+") 9+$* !,+$ $5"-+, *5*$+$" 95-!*+$5**)+- $5!)!5")$+*9 ,"5)*"+, -+$9 959$-+9  B=CBB1"3 !5$)$+ 9+99 !,+, $5$)"+$ *5*!+$* 95)9+*,$5*"+"$ $5!)!5"$+* ,"5-9+*) -+"9 95*-+9!  B=CBB1"3 !59-!+*" 9+$! !,+, $5$$+, *5"*9+!- 95"-+$$$5")+", $5!)!5"!,+$ ,*5!!-+9 -+- 95,-!+,  B=CBB1"3 !5-+$ 9+$! !,+* $59--+)! *5"9+)" 95*)*+"$5"9-+*! $5!)!5$"-+-- ,*5!),+$) -+-" 95,,,+"  B=CBB1"3 !5!,+-) 9+$! !,+)! $59""+)* *5$)9+$ 95*,,+-$$5$-"+** $5!)!5$,+)9 ,*5,"$+-* -+) 95!9!+"  B=CBB1"3 !5,!+)) 9+9" !+!9 $59,+") *5$$$+$ 95"9)+,$5$"+9) $5!)!59*+$) ,*5+"* -+ 5-"!+--  B=CBB1"3 !5!,$+$) 9+9- !!+-! $5*-+* *5$!$+) 95$*"+9"$5$!-+$ $5!)!599$+) ,*5--+9! )+-, 5),+)"  B=CBB1"3 )-5-,-+), 9+9 !!+*) $5*+! *59*9+), 959-,+-$59*"+) $5!)!5-,+)" ,*59,+", -+) 5-,+9*  B=CBB1"3 )-5)$+9! 9+9 !+, $5,)+,$ *599+) 959,+$$59,+-$ $5!)!5$-+) ,*5$$$+)" )+" 5,!+$  B=CBB1"3 )-59!+9 9+$* !+$) $5,9-+!" *5)$+" 95$9+-!$5)+)" $5!)!5!)+ ,*5",+9 -+ 5*9,+"*  B=CBB1"3 )-5*9*+$9 9+$! !+9* $5!-"+"- *5$*+!, 95,*-+,$59"+9- $5!)!5,*+-$ ,*5"-!+$! -+)* 5""+,9  B=CBB1"3 )-5"$+$ 9+9* !+9 $5!"+* *5!+,$ 95!-"+**$5,-+!* $5!)!5,+!9 ,*5**9+9$ -+)* 5$+!  B=CBB1"3 )-5$$+9- 9+9 !+$9 $5!!)+*) *5,*)+!9 95!,+!$$5,$)+$) $5!)!5!)"+) ,*59*+)$ -+)! 59-+!  B=CBB1"3 )-59"+- 9+$ !+!$ 95-*"+$ *5,)+- 5-$*+),$5,!"+!$ $5!)!5!$$+* ,*5)!-+-* -+*, 59,9+!!  B=CBB1"3 )-5")+!" 9+99 !+!* 95-,+*! *5!)-+"! 5)+9-$5!*,+$! $5!)!5!!9+" ,*5))9+* -+)- 59+))  B=CBB1"3 )-5,*$+" 9+$ !,+) 95))+") *5!"!+$" 5--+!-$5!,)+9) $5!-5-*+,) ,*5-""+$9 -+$ 5,"9+)"  B=CBB1"3 )-5,!,+** 9+$9 !+!9 95)$-+* *5!$+! 5$-+)*95-)-+$ $5!-5-9$+") ,5!!9+- -+*- 5,!!+"  B=CBB1"3 )-5!,"+9 9+9 !,+-$ 95)!-+)* "5-))+,* 5*)+,,95-$-+** $5!-5)-*+*) ,5!!+*$ -+)9 5!+9  B=CBB1$3 ))5-,+! 9+* !+!, 95**+*" "5-$)+)$ 5*!)+!95-!*+$" $5!-5)""+9 ,5,$9+$9 -+-! ,5-$)+!  B=CBB1$3 ))5))+ 9+,) !,+, 95$+,- "5-!-+-$ 5"9"+$995)*9+-- $5!-5),$+$ ,5,"+!- -+*- ,5)*-+",  B=CBB1$3 ))59$+, 9+,) !,+* 95*),+, "5)!+) 5$*,+95),+!, $5!-5+9 ,5)+*, -+-" ,5)-+)  B=CBB1$3 ))5*9-+* 9+* !,+") 95*9+- "5)9!+9* 59)+)995+ $5!-59!+) ,59*!+$, -+) ,5!-+*  B=CBB1$3 ))5"$"+"* 9+* !,+*, 95"-$+)" "5-!+") 59,$+"959$+*" $5!-5*))+-) ,5$9+)* -+-* ,5*-+-,  B=CBB1$3 ))5$"9+$* 9+, !,+"- 95""+*- "5",+*$ 5$+,95*-+$- $5!-5*$)+!* ,5"!9+- -+-9 ,5"",+)9  B=CBB1$3 ))59")+*- 9+,) !,+), 95"!-+9 "5,,+! 5,*+--95*$-+, $5!-5*!*+! ,5"*+) -+) ,5$,+",  B=CBB1$3      * + , &+ -&'$&    + #.    +  +              +  +  !"  !" &&" $+  ##    $% &'()*!+,-  /+ !" &&& +.) /  "    +$% &'()*!+,-     +  !"   " 5 7 9 567 % 567 213' 5 7 23' 5 7   #. 5 7 #.  5 7 "&  / 5 7 "&  1& / 5 7 . &   5 7 - 563:7  #&, ))5*9+)) 9+* !,+)) 95$*"+-) "5*,+-9 5!-9+**95*!"+) $5!-5"*$+* ,5*"!+!* -+)) ,59-,+$  B=CBB1$3 ))5,*-+ 9+* !,+-) 95$+)* "5*9+") 5!,-+)$95"*+** $5!-5"+)) ,5+* -+-! ,59,,+*  B=CBB1$3 ))5!"+!! 9+" !,+- 959-+$" "5"-9+!, ,5-$"+$95",-+" $5!-5$),+ ,5-*+!! -+-) ,59,+$  B=CBB1$3 )5-)!+$! 9+, !,+", 9599*+," "5""9+! ,5),+9)95$"+-" $5!-5$9-+$ ,5)*)+-" -+"* ,5,",+99  B=CBB1$3 )5))*+! 9+," !,+! 95-9+! "5",9+- ,5-+"95$9+) $5!-59-+$) ,5-$,+* -+)! ,5!,+-  B=CBB1$3 )5-,+$ 9+,) !,+-" 95$-+-* "5$9+, ,59+")959)-+* $5!-59""+)* ,)5!,$+$) -+" !5--,+$,  B=CBB1$3 )5*-+9) 9+$! !+! 95!*+*- "5$9$+$" ,5*$-+$-959$*+$- $5!-59,$+" ,)5!)+$* -+** !5-,,+*)  B=CBB1$3 )5*!+$9 9+9- !+," 95,*+-) "59-"+, ,5"$+-9959!+) $5!-59+,) ,)5,*!+)- -+-$ !5)9,+"*  B=CBB1$3 )5"!)+-, 9+$9 !+9- 95,,-+- "59"*+"! ,5"!,+$"95"-+ $5!-59+"" ,)599+ -+* !5"+!  B=CBB1$3 )5$,$+,$ 9+9- !+9) 95!*+ "59,+" ,5$*+-!95,*+! $5!-5,-,+" ,)59!*+! -+-" !5*+)"  B=CBB1$3 )59,-+"" 9+9 !+!! 95!9+- "5)+9$ ,59"+"-95,+"- $5!-5,"!+- ,)59-+)- -+*9 !5"-9+!,  B=CBB1$3 )5"+!* 9+$! !,+)! 5-)-+9" "59)+)9 ,5)+"*95,-+," $5!-5,!)+" ,)5$"+- -+) !5",9+,$  B=CBB1$3 )5,9,+" 9+,- !+!$ 5-$*+$ "5,--+$ ,5!"+*95!)*+ $5!-5!*+*$ ,)5"$+-) -+* !5$9$+!  B=CBB1$3 )5!9+,! 9+9- !,+), 5-!9+,$ "5,*!+" ,5,9,+,-95!$+-$ $5!-5!*+,, ,)5"-+-9 -+*- !59"$+,  B=CBB1$3 )*5-$+-- 9+9 !!+)* 5)"-+)$ "5,!+,) ,5!"+)*5---+*$ $5!)5-)$+! ,)5*!+,, -+!- !5$+9)  B=CBB1$3 )*5)$)+," 9+$! !!+") 5),*+! "5!-+!, !5-)$+$,5-"*+!! $5!)5-$!+)9 ,)5$+9- -+9 !5,-9+,  B=CBB1$3 )*5"$+) 9+," !!+) 59+$$ "5!9)+$9 !5-,+,5-,9+$ $5!)5)-)+* ,)5),9+" -+** !5,,$+  B=CBB1$3 )*5*"-+!) 9+, !!+!) 5-+* $5--*+9- !5)9)+!,5)*-+$ $5!)5)"$+,- ,)5))*+$$ -+9$ !5!9+"9  B=CBB1$3 )*5"*$+"$ 9+, *--+* 5*)*+"! $5-"$+,* !5*"+5)*+9! $5!)5)!-+-* ,)5-"+- -+"" )-5-",+*!  B=CBB1$3 )*5$"+- 9+, !!+! 5*$*+!) $5-,$+"9 !5*-+!-5)"+)) $5!)5*)+$" ,-5!"+! -+"- )-5)"+*-  B=CBB1$3 )*59)+-$ 9*+- *-)+$ 5*!9+- $5)+9* !5*"+)5$9+"- $5!)5$+99 ,-5!-"+!- )+" )-5-"+)9  B=CBB193 )*5-!+*, 9+,9 *-)+9" 5"*,+- $5)-+$ !5"""+*)5!,+"- $5!)5*-+", ,-5,*$+!, -+") )-5,*+  B=CBB193 )*5,-"+-9 9+!* *-+9, 5",)+*" $5)$+*, !5$)$+995*")+$" $5!)5*9+*- ,-59$+!- -+!, )-5*9$+9  B=CBB193 )*5,!,+)$ 9+! *-+9$ 5$"+)* $59-+9) !5$,9+)5*,"+** $5!)5")"+"9 ,-59!9+9" -+-$ )-5""+)!  B=CBB193 )*5!!+- 9+,! *-)+$9 5$9+)9 $5*-$+*$ !59$+$5"+*9 $5!)5"9)+) ,-599+9- )+-* )-5$,+!"  B=CBB193 )"5-,+-* 9+!* !,+"" 59)-+)* $5*"+*" !5*-+"5"-+** $5!)5$-$+)$ ,-5$$$+-, +!" )-59-!+9,  B=CBB193 )"5),)+9 9+,$ !,+$ 59$*+$ $5*,+$" !5,-"+5$)*+"$ $5!)5$"+*! ,-5",+- -+)$ )-59!-+-$  B=CBB193 )"59+-$ 9+! !,+-" 59!9+ $5"+* !5,,+*5$$9+" $5!)5$,!+$ ,-5"-!+* -+$) )-5-+)  B=CBB193 )"5*)+ 9*+"9 !,+*9 5*!+)! $5"9+$) !5!$*+-!5$!!+*! $5!)59*)+"$ ,-5**$+99 -+9" )-5,$)+-  B=CBB193 )"5"9"+!" 9"+$) *--+$, 5,-+*- $5$-,+!$ )-5-9+"-59"-+$- $5!)59"+!) ,-59*+$ +") )-5!*)+!  B=CBB193 )"5$$!+- 9$+- *-*+"- 5,)!+!* $5$$"+)! )-5-!,+,)59,-+)* $5!)5+)* ,-5)!+") *+-- ))5-)"+9$  B=CBB193 )"59$+! 99+$ *-$+!* 5,$+!* $59-*+-* )-5)9!+"5),+)* $5!)5+!) ,-5)*+), +9* ))5-!,+,$  B=CBB193 )"5"+$* 9+* *-,+)$ 5,!"+9$ $59$$+$ )-5*,+!5$"+,$ $5!)5,+*- ,-5-$$+) +"! ))5),"+!"  B=CBB193 )"5,")+" 9!+)- *)-+*! 5!!+) $5)-+,) )-5*-9+$,5,!+") $5!)5,,"+"$ !5!,!+- +9$ ))5)+9!  B=CBB193 )"5!*9+-- -+$) *)"+9! 5!9)+,9 $5-+! )-5*)+!5,+-9 $5!)5!"9+) !5!$+" "+$ ))5*9-+*  B=CBB193 )$5-!+$9 +-- *),+9 5!!)+!" $5,*$+* )-5"*+9,5,$+)" $5!5-)+* !5,99+", "+** ))5"",+!  B=CBB193 )$5)"+)9 *+*, *),+"$ ,5--+-, $5!-+!" )-5"!+"$5,,-+, $5!5-,)+9$ !5,-,+9) )+", ))5$*!+-)  B=CBB193 )$5),+"- "+, *+! ,5-"$+!) $5!*+- )-5$"!+,)5!-9+)) $5!5)$*+*" !5$*+ "+,9 ))59!+*-  B=CBB193 )$5*)*+" 9+*, *$+- ,5-9!+$- 95-"+*, )-59-*+,)5!!+- $5!5!+)) !5-)+*) +99 ))5-+"  B=CBB193 )$5"-+,* 9+") *+-$ ,5-!)+$ 95)*+9 )-59$$+)5!$)+!$ $5!5*-9+$ !59$+-! +-! ))5,)-+$  B=CBB193      * + , &+ -&'$&    + #.    +  +              +  +  !"  !" &&" $+  ##    $% &'()*!+,-  /+ !" &&& +.) /  "    +$% &'()*!+,-     +  !"   " 5 7 9 567 % 567 213' 5 7 23' 5 7   #. 5 7 #.  5 7 "&  / 5 7 "&  1& / 5 7 . &   5 7 - 563:7  #&, )$5$-)+! 9+"* *!+", ,5))*+,9 95-)+"" )-5-*+!5!"+-9 $5!5*,$+, !59-9+)" +$) ))5!--+)"  B=CBB193 )$5$+-" 9+,! *,+" ,5)*-+-* 95$!+, )-5*,+"*5!!-+* $5!5""$+$ !5$+9* )+$$ ))5!99+$9  B=CBB13 )$59*"+*) !+"* **-+9, ,5)"+,- 95*)+" )-59!+!,5--*+-- $5!5"!,+9* !5$"*+$ $+*9 )5-$+  B=CBB13 )$5!+-$ ,)+" *!+- ,5)$,+$9 95*!*+) )-5,)9+),5-),+9 $5!5$,-+9, !5"!,+9 +9! )5))9+"*  B=CBB13 )$5,+!" ,+)- **)+* ,5)+- 95"*+,* )-5,9+*9,5-*+ $5!599+$$ !5"$"+- +", )5-9+",  B=CBB13 )$5!)+"- ,+- **+)9 ,5),$+-* 95$$9+" )-5!-9+9$,5-"$+* $5!5"9+)9 !5")+) -+,, )5!9+$-  B=CBB13 )95-))+9 ,"+* ***+, ,5)!$+, 959*!+)- )-5!"!+*,,5-$9+- $5!5,*-+)9 !5*+! *+- )5*,$+9  B=CBB13 )95))-+*- ,$+!* ***+ ,5-*+,, 95+"9 )-5!!*+*!,5-9"+-, $5!5!)!+- !5**-+9 )+*) )5"!+,$  B=CBB13 )95--+"- ,$+!9 **"+ ,5)-+$ 95,-,+* ))5-*+!,5--+"$ $5!*5--)+$" !5!*+9) -+$- )5$9$+!  B=CBB13 )95!"+)* ,$+!9 **+9* ,5)9+,9 95,!)+,$ ))5-"+9,5-+-9 $5!*5-,9+, !5$"+) )+9! )59$"+"9  B=CBB13 )95*,!+)9 ,$+!! ***+$- ,5*+$* 95!9+*9 ))5))+$9,5-,*+* $5!*5))+!" !5)*+$$ -+!) )5"$+-$  B=CBB13 )95",*+!) ,+"" **"+, ,5,+!9 5-9)+", ))5)$,+,),5-,!+)9 $5!*5$,+) !5)"+9 +-" )5,*"+!-  B=CBB13 )95$,+" ,!+!9 ***+"" ,5*)+)- 5)"9+$ ))5--+-!,5-!)+*- $5!*5*""+*) !5)*$+ *+- )5!"+)  B=CBB13 )959+! !+$ ***+"9 ,5!+-* 5*-+" ))5"+-),5-,!+* $5!*5"!+*" !5-!9+)! +, )*5-)"+)$  B=CBB13 )959$+9 !*+"* **"+) ,5"+)" 5*)"+-* ))5,*+),5-,"+*" $5!*5$)"+-9 !5-$+* )+)9 )*5)-+,9  B=CBB13 )95,9+99 !+!) ***+!* ,5),+, 5"-)+)" ))5*$+9),5-,+!, $5!*59-+*- !5-)+*9 -+$ )*5)!"+!9  B=CBB13 )95!$+)$ !+! ***+$" ,5)*+!* 5",$+9 ))5*9+*,5-"+)* $5!*59,,+-$ ,5!+! -+" )*5,"+,)  B=CBB13 )5-$)+!* !+" **"+!* ,5-!+"* 5$)+- ))5"-,+$,5-9!+9* $5!*5"+") ,5!*!+- )+$9 )*5*"+9!  B=CBB13 )5)"9+)$ !)+!$ ***+- ,5-$+,- 59$$+, ))5""!+**,5-99+-- $5!*5,9-+*$ ,5!--+ )+" )*5"9"+-*  B=CBB13 )5*!+,- !)+!$ ***+- ,5-+9) 5*!+ ))5"!-+,-,5-9+,) $5!*5!"$+* ,5,9)+9" -+-- )*5$$*+)9  B=CBB13 )5**$+-$ !+-, ***+), ,5)!!+9 5,"+! ))5$**+*9,5-$!+"9 $5!"5-*)+99 ,5,)+"9 -+$9 )*59"*+!"  B=CBB13 )5"!+) !+-, **"+-* ,5)!$+,$ 5!-!+) ))5$$+)$,5-$9+-$ $5!"5))9+!! ,5,+- -+!- )*5**+$)  B=CBB13 )5$+," !+)) **"+)) ,5)!+" 5!!*+*$ ))59)9+)),5-$+9 $5!"5-+* ,5"*+" -+-! )*5,+$)  B=CBB13 )59)+9$ !+-, **"+-- ,5),,+!9 ,5-,+$$ ))59$+$9,5-"!+)9 $5!"5,,+9* ,5-"+*$ -+) )*5!)+$9  B=CBB13 )5))+$! !-+$ **"+-* ,5),9+! ,5)9+! ))59!,+-,5-"9+!! $5!"5*"+)$ ,599$+$9 )+9) )"5--)+,*  B=CBB13 )5,-+*$ !-+-$ ***+$ ,5),9+ ,5",+ ))5")+,5-"9+" $5!"5"9)+)- ,59$+"" -+!, )"5-!*+-$  B=CBB13 )5!-+- !-+-, ***+" ,5),9+)9 ,5***+"* ))5,*+9!,5-"9+*9 $5!"5$"9+!- ,5$,$+*" -+* )"5),*+"*  B=CBB13 )5!!9+9 ,!+$! ***+,, ,5),9+"* ,5"),+*- ))5,$+9,,5-"9+9* $5!"59*+!- ,5$"$+ -+9 )"5*+9)  B=CBB13 ),5-!"+)- ,!+* ***+- ,5),+* ,5$-$+"" ))5,9!+-$,5-"+$ $5!"5)+- ,5$-"+! -+* )"5*99+*,  B=CBB13 ),5),,+*! ,,+! ***+9$ ,5),,+9, ,5$,!+9 ))5!))+*,5-",+,, $5!"5,-9+9$ ,5"9"+! -+9" )"5"$9+*-  B=CBB13 ),5,+,! ,+!9 ***+$9 ,5)!)+*$ ,59,+,9 ))5!$$+"$,5-$)+$$ $5!"5,!9+!" ,5"*+" )+- )"5$$)+-  B=CBB13 ),5*9+!" ,+!* ***+*, ,5)!"+$" ,5$,+", ))5!!$+-,5-$"+" $5!"5!+9* ,5*,$+) -+- )"59*$+!*  B=CBB13 ),5"+9" ,!+)* **"+)$ ,5)!+-- ,5,""+! )5-*+"!,5-$+- $5!$5-9"+$ ,5*"$+, )+"! )"5+--  B=CBB13 ),5$9+), ,!+)- ***+,, ,5)!,+"9 ,5!!+9 )5-,+!-,5-$,+99 $5!$5)$-+99 ,5*-9+, -+! )"5,)9+,9  B=CBB13 ),599+-$ ,,+-$ ***+$* ,5--+, !5-)"+! )5)-+!,5-9)+- $5!$5*9+,) ,59+)$ )+) )"5!-+)  B=CBB13 ),5$9+"! ,,+-$ **"+*$ ,5-"+-* !5-!!+-, )5)9+*,,5-9"+* $5!$5*+) ,5,+-$ -+, )"5!!9+!*  B=CBB13 ),5,$)+-! ,,+-, ***+9" ,5-+ !5),"+-$ )5-*+,*,5-9+" $5!$5"-,+,- ,5),,+! -+$ )$5-,9+,  B=CBB13 ),5!"$+$ ,,+)$ ***+"9 ,5)-+** !59,+$$ )5"$+,,5--+$* $5!$5"!"+"* ,5)"!+*- -+- )$5)9+  B=CBB13 )!5-*!+-, ,!+- ***+"9 ,5)+9- !5*$+ )5,+99,5-+,- $5!$5$!+* ,5)-!+," -+!, )$59$+!9  B=CBB13 )!5)**+9 !-+- ***+*- ,5)*+*$ !5"*9+" )5**-+-,5-*+$$ $5!$599"+,, ,5-9!+,$ )+- )$5*$9+)"  B=CBB13      * + , &+ -&'$&    + #.    +  +              +  +  !"  !" &&" $+  ##    $% &'()*!+,-  /+ !" &&& +.) /  "    +$% &'()*!+,-     +  !"   " 5 7 9 567 % 567 213' 5 7 23' 5 7   #. 5 7 #.  5 7 "&  / 5 7 "&  1& / 5 7 . &   5 7 - 563:7  #&, )!5+,, !-+-$ **+9" ,5)*+! !5$-+- )5*+,9,5-*+"! $5!$5"!+!! ,5-!+*9 -+- )$5""9+9  B=CBB13 )!5*+) !-+9* **+$ ,5)+* !59-"+,, )5")9+$*,5-+!* $5!$5,*$+*" 5!,,+-" -+9 )$5$*+)  B=CBB13 )!5")+) !)+! **+! ,5)-+9* !59,,+! )5"$!+!*,5--+,* $5!$5!-+"* 5!"9+!! )+*! )$59+$!  B=CBB13 )!5$)-+$ !+9- **+, ,5-9+!" !5)+* )5$-*+-*,5-9+)" $5!95--"+$ 5!-9+- -+!) )$5)+)9  B=CBB13 )!59-$+$ !)+,* ***+$ ,5-*+ !5,$9+)* )5$"9+",,5-9*+" $5!95-!-+-! 5,9$+) )+*- )$5,-,+-  B=CBB13 )!59!!+9, !)+) **)+!- ,5--+,$ !5!*!+" )5$,!+,5-9)+-$ $5!95)"+9- 5,"+- )+9 )$5,!+!!  B=CBB13 )!5!*+! !-+9* **+," ,5)!!+") )-5-+!9 )59**+",5-$!+9) $5!95$!+9 5,+," )+) )$5!,,+*9  B=CBB13 )!5,,+9- !-+$ **+9 ,5)!,+"* )-5)-9+ )599+*",5-$,+9* $5!95*"*+9 5"+$ -+" )95-,+-"  B=CBB13 )!5!,+$, ,!+!* **+9 ,5)!,+-) )-5)!-+$9 )5-+-,5-$,+) $5!95"!+)! 5--+! -+9 )95)9!+-  B=CBB13 -5-+ !-+) ***+- ,5)!+!* )-5"+ )59*+,5-$,+)* $5!95$)"+$9 599-+-! -+$" )95$!+$9  B=CBB13 -5)+-, ,!+$- **+,- ,5)!,+- )-5*$!+" )5,-9+*,,5-$,+"- $5!959--+)! 59)!+! -+9 )95*$-+  B=CBB13 -599+$ ,,+!" **+") ,5)!!+"! )-5""*+, )5,"!+!*,5-$!+9! $5!959,$+"- 5$,+-, -+ )95""-+!9  B=CBB13 -5*9-+$ ,,+!" **+)$ ,5-)+* )-5$9+", )5,!*+9$,5-9)+"* $5!959!+, 5$*9+9! -+, )95$*)+)"  B=CBB13 -5"$"+9 ,,+!" **+* ,5-+! )-59-!+$" )5!*+"9,5-9*+) $5!95,$"+-) 5"!$+- -+-! )959)+!  B=CBB13 -5$"9+,* ,!+9$ **+* ,5-"+)- )-59!)+9 )5!,-+-",5-9"+*- $5!95!*9+,! 5"$"+!) -+!" )95-!+9  B=CBB13 -59")+9! ,!+9, **+,$ ,5-"+99 )-5$+9 )*5-*+"),5-9"+,9 $5!5-+") 5")*+,! -+)* )95,--+"-  B=CBB13 -5*9+)- ,!+) **+* ,5-$+)9 )-5,$!+"- )*5-99+!$,5-9$+*9 $5!5)-+*9 5*+- -+99 )95,!-+,  B=CBB13 -5,*-+-, !-+*! **+)) ,5-$+-, )-5!"+$- )*5))-+,,5-9$+, $5!5)!)+9$ 5**)+)$ -+* )95!,)+)-  B=CBB13 -5!*+$ !-+!" **+ ,5-*+!! ))5-$+$" )*5)$"+)9,5-9"+)! $5!5$+,$ 5!-+)" -+! )5--+!)  B=CBB13 )5-),+-* !)+!$ **+ ,5-)+9) ))5)-!+)* )*5)!+9,,5-9)+,) $5!5*9-+9) 5",+!$ )+ )5)9)+"  B=CBB13 )5))+,) !)+" **+"! ,5)!,+$9 ))5)!*+-$ )*5")+9",5-$,+9 $5!5""$+) 5-+*" -+*9 )5$+))  B=CBB13 )5-9+! !)+"* **)+!) ,5)!$+!9 ))59+ )*5,$+$),5-$9+)9 $5!5$*-+)) 5)9$+! -+- )5*"+")  B=CBB13 )5*-)+9! !-+9* **+,! ,5)!"+9 ))5*9-+" )*5*!+"),5-$"+"9 $5!59)$+9 5)"+" )+** )5"**+,  B=CBB13 )5*!$+9- !-+*! **+9 ,5)!*+" ))5""*+" )*5*+*9,5-$*+9 $5!59!!+! 5-,*+9 -+*$ )5$*+)9  B=CBB13 )5",!+$) !-+", **+* ,5)!+) ))5$+)! )*5")$+"*,5-$+!) $5!5,"+$* 5-"+,! -+) )59)*+-  B=CBB13 )5$,"+* !-+", **+$) ,5)!)+!) ))59))+*, )*5"$!+-*,5-$+)) $5!5,9!+,, 5--)+9" -+* )5-*+,,  B=CBB13 )59!+-- !-+" ***+)9 ,5)!)+) ))59!$+9) )*5$-+9,5-$)+* $5!5!$$+, 95!9-+ -+9! )5!"+"  B=CBB13 )5*+9 !-+$) **+" ,5)!-+"- ))5,-+-- )*5$"$+*$,5-$-+9- $5!,5-"-+,* 95!-+-" -+"$ )5,,$+-,  B=CBB13 )5,9,+$ !-+*9 **+$ ,5),!+9, ))5,9"+) )*5$,,+,,,5-"!+,, $5!,5)9+) 95,,+,9 -+" )5!$+,*  B=CBB13 )5!9+9 ,!+"- **+) ,5),!+,, ))5!"+$" )*59*+$,5-$-+-, $5!,5)-+) 95,*+$9 )+)) ),5-99+-,  B=CBB13 5-$9+!- ,!+$* **+! ,5)!-+9 )5-*)+- )*59$+!,,5-$-+!9 $5!,5!$+$" 95!9+"* -+,) ),5)$9+"  B=CBB13 5)$)+* ,!+$- **+!" ,5)!)+$9 )5))$+*) )*5),+!,5-$)+9 $5!,5*,-+,) 95$$+! -+-" ),5"9+9  B=CBB13 5"$+" ,!+"- **+,, ,5)!+"9 )5)!!+-" )*59)+,-,5-$+99 $5!,5"9$+9! 95)$+*) -+) ),5**9+-  B=CBB13 5*"-+"* ,!+" **+9 ,5)!*+"- )5,*+$9 )*5,-$+-,5-$*+9- $5!,5$$)+* 959"+ -+)$ ),5"+9)  B=CBB13 5"*"+*) !-+) **+9 ,5)!*+9! )5*99+!! )*5,",+*,5-$*+,! $5!,59*$+!9 959**+$ -+$ ),5$)+"!  B=CBB13 5$,+,- !-+$ **+9) ,5)!*+-, )5"$-+!) )*5,!)+99,5-$*+, $5!,5)+-$ 95$!+"! -+"* ),59-+!!  B=CBB13 59)+9 !-+9- ***+$ ,5)!+)* )5$**+9, )*5!**+!9,5-$+** $5!,5,-"+!9 95$$+$- -+9! ),59!9+,,  B=CBB13 5)9+)" !-+$" **+9 ,5)!)+)! )59)+ )*5!9+,-,5-$)+*! $5!,5,!-+- 95$)+-) -+$ ),5,+)-  B=CBB13 5,-!+,! !-+$ ***+* ,5)!-+! )5-)+*- )"5-)!+*9,5-$-+"! $5!,5!"+, 95")+, -+$- ),5,9+  B=CBB13 5!-"+!! !-+)) **+$) ,5),!+ )5,$+!* )"5-9+*,5-"!+! $5!!5-9-+9 95"*-+, -+!- ),5!9+9!  B=CBB13      * + , &+ -&'$&    + #.    +  +              +  +  !"  !" &&" $+  ##    $% &'()*!+,-  /+ !" &&& +.) /  "    +$% &'()*!+,-     +  !"   " 5 7 9 567 % 567 213' 5 7 23' 5 7   #. 5 7 #.  5 7 "&  / 5 7 "&  1& / 5 7 . &   5 7 - 563:7  #&, 5!!,+$! !-+-$ **+"" ,5),!+$! )5,9,+!" )"5)-$+!!,5-"!+! $5!!5)""+," 95*,!+,$ -+)- )!5-$+")  B=CBB13 *5-!+"- !-+-$ **+*$ ,5),!+$) )5!$+- )"5)"!+"9,5-"!+) $5!!5!+)" 95*",+- -+)- )!5)"+*,  B=CBB13 *5),+"* !-+! **)+,* ,5),,+,) )*5-*9+-" )"5)!*+!",5-"!+-) $5!!5*)"+*) 95*-9+$ -+!$ )!5*,+9$  B=CBB13 *5,)+!9 !-+9- ***+9- ,5),+9 )*5)-+-" )"5*+9,5-"+, $5!!5*!!+", 959$+$! )+,, )!5*!+)"  B=CBB13 *5**+, !-+99 ***+)9 ,5),9+99 )*5-+) )"5,+"-,5-"9+,9 $5!!5",+9 959+$ -+", )!5")9+*  B=CBB13 *5"9+!* !-+ ***+9 ,5),$+$ )*5,9+*$ )"5*-+",5-"$+ $5!!5$9,+- 95),+-" -+9" )!5$-9+$-  B=CBB13 *5$9)+$, ,!+!! ***+,* ,5),"+!" )*5*-+* )"5*9)+,,5-"$+)" $5!!59$*+)$ 95)",+-* -+, )!5$!$+9"  B=CBB13 *59$9+** ,!+!! **+,$ ,5),"+!9 )*5"$$+-" )"5"-"+*",5-"$+)9 $5!!5*,+! 95)-+,, )+-* )!59,9+-"  B=CBB13 *5$)+$$ !-+! **+*$ ,5),"+*) )*5$*!+$, )"5"",+)$,5-""+$) $5!!5,"+9, 95-99+"* -+!! )!5+9  B=CBB13 *5,"$+)- !)+,- **)+9 ,5),+- )*59+)" )"5"!+-,,5-"+"- $5!!5!-,+"* 95-"+,) )+** )!5,9+)"  B=CBB13 *5!*!+*" !)+"9 **+!9 ,5)!+$ )*5-$+$" )"5$*$+,!,5-*!+ $5!!5!!*+-) $5!,*+*" )+" )!5!$+$  B=CBB13 "5-*"+- !)+"! ***+" ,5)+-9 )*5!-+" )"5$,+9",5-*+9 $5!*-5-!+*$ $5!"+!9 -+, -5-",+",  B=CBB13 "5),+9" !)+-9 ***+-- ,5)"+! )*5,"+9! )"59-+",5-*$+) $5!*-5)9"+"" $5!-*+) -+!) -5)*,+-,  B=CBB13 "5*+,) !)+-! ***+,, ,5)*+)! )*5!$!+,- )"599*+!,5-**+*! $5!*-5$-+9! $5,9*+-$ -+!* -5,+,  B=CBB13 "5*),+," !-+!) ***+! ,5))+$* )"5-"$+)* )"5-$+-!,5-*)+* $5!*-5**+)" $5,*+9* -+)! -5*)!+-  B=CBB13 "5")"+-- !-+!) ***+!9 ,5)-+- )"5)*-+9) )"5"9+,!,5-*-+ $5!*-5"*+" $5,"+ -+-" -5"-!+9!  B=CBB13 "5$-,+$ !-+,$ ***+9- ,5)9,+$9 )"5)$+9- )"5,,+",5-,+9 $5!*-5$-!+,$ $5""+" -+*! -5"!!+,  B=CBB13 "59-+!, !)+) ***+99 ,5)99+!" )"5*--+-) )"5,*-+$!,5-+)" $5!*-5$!$+*! $5-$+$ -+! -5$,!+9*  B=CBB13 "59!+)$ !)+) **"+- ,5)9$+)- )"5*,"+$* )"5,+-9,5-$+*- $5!*-59,)+-* $5999+)" -+"" -59!+-  B=CBB13 "5,!+*) !-+,$ ***+! ,5)9*+$ )"5"9+*) )"5!)+$9,5-*+ $5!*-59"+,! $59+!9 -+" -599+,"  B=CBB1,3 "5,,$+* !-+! ***+* ,5)9+)" )"5$$*+* )"5!$$+*-,5-+*" $5!*-5,$+-$ $5$,+9* -+"" -5,$,+*  B=CBB1,3 "5!,)+"9 !-+,$ ***+!$ ,5)9-+ )"59*!+"* )"5!!+!*,5--+! $5!*-5!*!+*- $5$"+"- -+9) -5!"!+,!  B=CBB1,3 $5-$+$- !-+,, ***+)$ ,5)$!+*$ )"5*+9) )$5-*!+,),5-)!+$$ $5!*)5-"+9) $5$-+, -+,$ )5-*!+$-  B=CBB1,3 $5)9!+$ !-+,* **)+$$ ,5)$+!" )"5,-9+!* )$5-,*+"9,5-),+)" $5!*)5)-!+)- $5"99+$$ )+- )5)!+*  B=CBB1,3 $59"+* !)+- **)+9" ,5)$9+* )"5,!-+*- )$5),+$$,5-)9+$ $5!*)5)!*+9! $5"*+,- -+ )5-+!!  B=CBB1,3 $5*$+,) !-+! **+9, ,5)$"+) )"5!+! )$5)+),,5-)"+!) $5!*)5+", $5*,+", )+) )5*)-+9!  B=CBB1,3 $5"$)+), !-+9- ***+* ,5)$*+"* )$5-$9+$ )$5)"+9,5-)*+9* $5!*)5*9)+!" $5*"+ )+)! )5*!!+,"  B=CBB1,3 $5$"$+* !-+$" **+* ,5)$+"! )$5)"-+" )$5$+),5-)+9! $5!*)5""+* $5*-+) )+$! )5"!-+*  B=CBB1,3 $59*!+9" !)+"9 **+) ,5)$-+,$ )$5*+$* )$5*-)+-),5-))+-$ $5!*)5$*)+$9 $59-+99 -+!, )5$,-+*  B=CBB1,3 $5*"+, !+"$ **+!, ,5)"+9- )$5*-+!9 )$5*""+,,5--+,- $5!*)59)+) $5)!+- )+*" )59)+$-  B=CBB1,3 $5,!+$) !+") **"+" ,5)"*+$! )$5*!+ )$5*,9+*,5--*+! $5!*)5-*+)- $5)!+99 )+$ )59)+$!  B=CBB1,3 $5!*+*! !)+! ***+!) ,5)"-+-" )$5"+) )$5"+9),5---+" $5!*)5,,+9" $5)")+)" -+$ )5,$-+9!  B=CBB1,3 95-),+$ !)+!, **"+$9 ,5)*9+,- )$5$9+,* )$5"9,+!"5!!+-- $5!*)5,$+* $5)-+- -+9! )5!"-+!9  B=CBB1,3 95))+,$ !+-$ **"+)* ,5)**+"! )$59"+,) )$5$-!+95!!*+9! $5!*)5!9)+"" $5-9*+9 -+"9 5-*-+"-  B=CBB1,3 95-9+! !+$ **"+9 ,5)!+- )$5*+*) )$5$$-+95!,!+!- $5!*5-"+-" $5-$+9 -+$ 5))!+$"  B=CBB1,3 95*--+!" !+") ***+*- ,5)$+9) )$5,)9+9! )$5$!+)5!,$+,) $5!*5)*+$" "5!,9+-9 )+-* 5-!+-  B=CBB1,3 95*!9+)- !)+$ **+, ,5)+*$ )$5!-)+$- )$59*$+5!,+$$ $5!*5),+$- "5!"$+*! )+-" 5!!+!"  B=CBB1,3 95",!+9 !)+$$ ***+*9 ,5))!+," )$5!,$+-- )$59+$95!,-+-" $5!*5*-*+)" "5!-$+*, -+$ 5*,!+*!  B=CBB1,3 95$,"+)" !-+$) ***+$ ,5)),+)" )95-9!+*) )$5)!+!$5!,+*" $5!*5*,,+$, "5,9$+*$ )+)) 5"!+"$  B=CBB1,3 959,+9 !-+- **+$ ,5))+) )95)$*+)- )$59+,)5!+!) $5!*5"*+$* "5,"+,* -+,! 5$9!+"9  B=CBB1,3      * + , &+ -&'$&    + #.    +  +              +  +  !"  !" &&" $+  ##    $% &'()*!+,-  /+ !" &&& +.) /  "    +$% &'()*!+,-     +  !"   " 5 7 9 567 % 567 213' 5 7 23' 5 7   #. 5 7 #.  5 7 "&  / 5 7 "&  1& / 5 7 . &   5 7 - 563:7  #&, 95*+-) !-+-$ ***+) ,5))+9$ )95*+") )$5,-9+-95!+,$ $5!*5$$!+-- "5,*+!" -+$, 599-+))  B=CBB1,3 95,9+9 !-+- **+! ,5))+$! )95*)+," )$5,"!+-"5!+! $5!*59""+$! "5"*+* -+) 5$-+9,  B=CBB1,3 95!9+," !-+-! **+!" ,5))+$- )95"-9+$) )$5,!+*)5!+- $5!*5*-+" "5-+") -+-, 5,")+9)  B=CBB1,3 95!,!+-- !-+-! **+!" ,5))+"9 )95"!+,- )$5!-"+)5!+99 $5!*5$"+-" "59!)+) -+-- 5,99+9 4D..       WELL NAME API # SERVICE ORDER #FIELD NAME SERVICE DESCRIPTION DELIVERABLE DESCRIPTION DATA TYPE DATE LOGGED COLOR PRINTS Electronic delivery GMTU MT7-94 50-103-20858-00-00 223-049 GMTU MEMORY geoVISION FINAL FIELD 5-Sep-23 1 Originated: Delivered to:6-Nov-23 Kayla Junke 06Nov23-VT01 Natural Resources Technician Alaska Oil and Gas Conservation Commission 600 E 57th Place 333 W. 7th Ave, Anchorage, AK 99501-3539 Anchorage, AK 99518 (907) 273-1700 main (907)273-4760 fax TRANSMITTAL DATE TRANSMITTAL # Transmittal Receipt ________________________________ X____________________________________________ Print Name Signature Date Please return via courier or sign/scan and email a copy to Schlumberger. VTuong@slb.com SLB Auditor - A Transmittal Receipt signature confirms that a package (box, envelope, etc.) has been received and the contents of the package have been verified to match the media noted above. The specific content of the CDs and/or hardcopy prints may or may not have been verified for correctness or quality level at this point. # Schlumberger-Private PTD: 223-049 T38123 Kayla Junke 11/8/2023 Kayla Junke Digitally signed by Kayla Junke Date: 2023.11.08 10:02:03 -09'00' T + 1 337.856-7201 1058 Baker Hughes Drive Broussard, LA 70518, USA Oct 20, 2023 AOGCC Attention: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Alaska 99501-3539 Subject:Final Log Distribution for ConocoPhillips Alaska, Inc. MT7-94 Greater Mooses Tooth API #: 50-103-20858-00 Permit No: 223-049 Rig: Doyon 25 The final deliverables were uploaded via https://copsftp.sharefile.com/ for the above well. Items delivered: MWD/LWD Digital Las Data, Graphic Images CGM/PDF and Survey Files. MT7-94 is located in a federal oil and gas unit. Only with respect to the MT7-94 Well Data, CPAI hereby waives its right to indefinite confidentiality, under 5 U.S.C. 552(b)(4) and (9). Nothing in this communication should be construed as a waiver of indefinite confidentiality on any other wells. Please note that for wells not on State land, a state agency should seek consent from the landowner prior to the release of well data by the state agency. See, e.g., AS 43.55.025(f)(2)(C)(i). Here, the landowner is the Bureau of Land Management (BLM) and/or Arctic Slope Regional Corporation (ASRC). Thank you. Signature of receiver & date received: Please return transmittal letter to: Garrett Brown Garrett.Brown@conocophillips.com Luis Arismendi Luis.arismendi@bakerhughes.com PTD: 223-049 T38092 10/20/2023 Kayla Junke Digitally signed by Kayla Junke Date: 2023.10.20 14:42:18 -08'00' STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________GMTU MT7-94 JBR 12/05/2023 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:0 Witnessed gas alarms and PVT's only Test Results TEST DATA Rig Rep:R. Fritts/ C. BaliOperator:ConocoPhillips Alaska, Inc.Operator Rep:J. Benedict/ L. Shirley Rig Owner/Rig No.:Doyon 25 PTD#:2230490 DATE:10/1/2023 Type Operation:DRILL Annular: 250/3500Type Test:OTH Valves: 250/3500 Rams: 250/3500 Test Pressures:Inspection No:bopAGE231018152339 Inspector Adam Earl Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 3 MASP: 2836 Sundry No: Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.P Test Fluid W Misc NA Upper Kelly 1 NT Lower Kelly 1 NT Ball Type 4 NT Inside BOP 2 NT FSV Misc 0 NA 15 NTNo. Valves 1 NTManual Chokes 1 NTHydraulic Chokes 0 NACH Misc Stripper 0 NA Annular Preventer 1 13 5/8"NT #1 Rams 1 2 7/8X5 1/2"NT #2 Rams 1 Blind/Shear NT #3 Rams 1 2 7/8X5 1/2"NT #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 3 1/8"NT HCR Valves 2 3 1/8"NT Kill Line Valves 2 3 1/8"NT Check Valve 0 NA BOP Misc 0 NA System Pressure NT Pressure After Closure NT 200 PSI Attained NT Full Pressure Attained NT Blind Switch Covers:NT Bottle precharge NT Nitgn Btls# &psi (avg)NT ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector 0 NAMS Misc Inside Reel Valves 0 NA Annular Preventer NT #1 Rams NT #2 Rams NT #3 Rams NT #4 Rams NA #5 Rams NA #6 Rams NA HCR Choke NT HCR Kill NT       Operator performed full BOPE Test; Inspector unable to witness except as noted. Charts from full BOPE test attached. -- J. Regg; 12/5/2023 BOPE Test - Doyon 25 GMTU MT7-94 (PTD 2230490) 10/1/2023 BOPE Test - Doyon 25 GMTU MT7-94 (PTD 2230490) 10/1/2023 MT7-94 10/1/2023 Tested to 250PSI/5MIN, 35OOPSI/10 MIN 4” Test Joint 1.Annular Preventer, UIBOP, Valves: 1, 13, 14, 15, Kill line 2.UPR (2 7/8” x 5 1/2”), LIBOP, Valves: 10, 12, 2, HCR KILL 3.Valves: 6, 9, 11, Manual Kill, 5” Dart valve. 4.Valves: 5, 7, 8; 5” FOSV #1 5.Valve: 3; 5” FOSV #2 6.LPR (2 7/8” x 5 ½”), 4” DART VALVE 7.BLIND RAMS, 4” FOSV #1, Valves:4 8.Hydraulic Choke A, Manual Choke B 5 1/2” Test Joint 9.Annular, 4” FOSV #2 10. UPR (2 7/8” x 5 ½”), Manual Choke 11.LPR (2 7/8 x 5 ½”) PTD 2230490 ZZ3-049 SAMPLE TRANSMITTAL TO: AOGCC 333 WEST 7T" SUITE 100 ANCH. AK. 99501 279-1433 OPERATOR: CPAI SAMPLE TYPE: Dry Cuttings SAMPLES SENT: MT7-94 4090 - 13561 6 Boxes SENT BY: M. McCRACKEN l 859 DATE: September 28, 2023 AIR BILL: N/A CPAL CPA12023092801 CHARGE CODE: N/A NAME: MT7-94 NUMBER OF BOXES: 6 Boxes UPON RECEIPT OF THESE SAMPLES, PLEASE NOTE ANY DISCREPANCIES AND RETURN A SIGNED COPY OF THIS FORM TO: CONOCOPHILLIPS, ALASKA 700 G ST ATO-380 ANCHORAGE, AK. 99510 ATTN: MIKE McCRACKEN Mike.mccracken@conocophillips.com RECEIVED: C �.` I V AOGC t > >  E  D   W /  η ^ Z s /    K Z   Z  η& /  >   E  D  ^ Z s /     ^  Z / W d / K E   > / s  Z   >     ^  Z / W d / K E   d   d z W    d   > K ' '   K > K Z  WZ / E d ^ ů Ğ Đ ƚ ƌ Ž Ŷ ŝ Đ  ĚĞ ů ŝ ǀ Ğ ƌ LJ GM T U M T 7 - 9 4 5 0 - 1 0 3 - 2 0 8 5 8 - 0 0 - 0 0 2 2 3 - 0 4 9 G M T U M E M O RY T o p o f C e m e n t PR O C E S S E D 2 4 - S e p - 2 3 1 dƌ Ă Ŷ Ɛ ŵ ŝ ƚ ƚ Ă ů  Z Ğ Đ Ğ ŝ Ɖ ƚ ͺͺͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ y ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ ͺ Wƌ ŝ Ŷ ƚ  E Ă ŵ Ğ ^ ŝ Ő Ŷ Ă ƚ Ƶ ƌ Ğ  Ă ƚ Ğ Wů Ğ Ă Ɛ Ğ  ƌ Ğ ƚ Ƶ ƌ Ŷ  ǀ ŝ Ă  Đ Ž Ƶ ƌ ŝ Ğ ƌ  Ž ƌ  Ɛ ŝ Ő Ŷ ͬ Ɛ Đ Ă Ŷ  Ă Ŷ Ě  Ğ ŵ Ă ŝ ů  Ă  Đ Ž Ɖ LJ  ƚ Ž  ^ Đ Ś ů Ƶŵ ď Ğ ƌ Ő Ğ ƌ ͘ sd Ƶ Ž Ŷ Ő Λ Ɛ ů ď ͘ Đ Ž ŵ ^>    Ƶ Ě ŝ ƚ Ž ƌ  Ͳ   d ƌ Ă Ŷ Ɛ ŵ ŝ ƚ ƚ Ă ů  Z Ğ Đ Ğ ŝ Ɖ ƚ  Ɛ ŝ Ő Ŷ Ă ƚ Ƶ ƌ Ğ  Đ Ž Ŷ Ĩ ŝ ƌ ŵ Ɛ  ƚ Ś Ă ƚ  Ă  Ɖ Ă Đ Ŭ Ă Ő Ğ  ; ď Ž dž ͕  ĞŶ ǀ Ğ ů Ž Ɖ Ğ ͕  Ğ ƚ Đ ͘ Ϳ  Ś Ă Ɛ  ď Ğ Ğ Ŷ  ƌ Ğ Đ Ğ ŝ ǀ Ğ Ě  Ă Ŷ Ě  ƚ Ś Ğ  Đ Ž Ŷ ƚ Ğ Ŷ ƚ Ɛ  Ž Ĩ  ƚ Ś Ğ  Ɖ Ă Đ Ŭ Ă ŐĞ  ŚĂ ǀ Ğ  ď Ğ Ğ Ŷ  ǀ Ğ ƌ ŝ Ĩ ŝ Ğ Ě  ƚ Ž  ŵ Ă ƚ Đ Ś  ƚ Ś Ğ  ŵ Ğ Ě ŝ Ă  Ŷ Ž ƚ Ğ Ě  Ă ď Ž ǀ Ğ ͘   d Ś Ğ  Ɛ Ɖ Ğ Đ ŝ Ĩ ŝ Đ ĐŽ Ŷ ƚ Ğ Ŷ ƚ  Ž Ĩ  ƚ Ś Ğ    Ɛ  Ă Ŷ Ě ͬ Ž ƌ  Ś Ă ƌ Ě Đ Ž Ɖ LJ  Ɖ ƌ ŝ Ŷ ƚ Ɛ  ŵ Ă LJ  Ž ƌ  ŵ Ă LJ  Ŷ Ž ƚ  Ś Ă ǀ Ğ  ď ĞĞ Ŷ  ǀĞ ƌ ŝ Ĩ ŝ Ğ Ě  Ĩ Ž ƌ  Đ Ž ƌ ƌ Ğ Đ ƚ Ŷ Ğ Ɛ Ɛ  Ž ƌ  Ƌ Ƶ Ă ů ŝ ƚ LJ  ů Ğ ǀ Ğ ů  Ă ƚ  ƚ Ś ŝ Ɛ  Ɖ Ž ŝ Ŷ ƚ ͘ η^ Đ Ś ů Ƶ ŵ ď Ğ ƌ Ő Ğ ƌ Ͳ W ƌ ŝ ǀ Ă ƚ Ğ PT D : 2 2 3 - 0 4 9 T3 8 0 0 9 9/ 2 5 / 2 0 2 3 Ka y l a J u n k e Ka y l a Ju n k e Di g i t a l l y s i g n e d by K a y l a J u n k e Da t e : 2 0 2 3 . 0 9 . 2 5 13 : 3 4 : 3 0 - 0 8 ' 0 0 ' Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Chris Brillon Wells Engineering Manager Conoco Phillips Alaska, Inc. 700 G Street Anchorage, AK, 99501 Re: Greater Mooses Tooth Field, Rendezvous Oil Pool, MT7-94 Conoco Phillips Alaska, Inc. Permit to Drill Number: 223-049 Surface Location: 1069 FSL, 2049 FWL, S32 T10N R2E, UM Bottomhole Location: 174 FSL, 115 FEL, S10 T10N R1E, UM Dear Mr. Brillon: Enclosed is the approved application for the permit to drill the above referenced well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for all well logs run must be submitted to the AOGCC within 90 days after completion, suspension, or abandonment of this well, or within 90 days of acquisition of the data, whichever occurs first. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Brett W. Huber, Sr. Chair, Commissioner DATED this ___ day of July 2023. 05 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.07.05 15:18:28 -08'00' 1a. Type of Work: 1b. Proposed Well Class: Exploratory - Gas Service - WAG Service - Disp 1c. Specify if well is proposed for: Drill Lateral Stratigraphic Test Development - Oil Service - Winj Single Zone Coalbed Gas Gas Hydrates Redrill Reentry Exploratory - Oil Development - Gas Service - Supply Multiple Zone Geothermal Shale Gas 2. Operator Name: 5. Bond: Blanket Single Well 11. Well Name and Number: Bond No. 3. Address: 6. Proposed Depth: 12. Field/Pool(s): MD: 31,253 TVD: 8049 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 139.5 15. Distance to Nearest Well Open Surface: x- 290133 y- 5915890 Zone- 4 100.6 to Same Pool: 2028' to Rendezvouz A 16. Deviated wells: Kickoff depth: 500 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 90° degrees Downhole: Surface: Hole Casing Weight Grade Coupling Length MD TVD MD TVD 42" 20" 94# H40 Welded 80 40 40 120 120 16" 13-3/8" 68# L80 H563 4040 40 40 4040 2998 12-1/4" 9-5/8" 47# T95 H563 13449 40 40 13449 7326 8-1/2" x 9-7/8" 7" 29#L80 H563 2140 13299 7258 15439 8099 6-1/8" 4-1/2" 12.6# L-80 H563 15989 15264 8060 31253 8049 19.PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Junk (measured): TVD Hydraulic Fracture planned? Yes No 20. Attachments: Property Plat BOP Sketch Drilling Program Time v. Depth Plot Shallow Hazard Analysis Diverter Sketch Seabed Report Drilling Fluid Program 20 AAC 25.050 requirements Contact Name: Chris Brillon Contact Email:Brad.Gorham@conocophillips.com Wells Engineering Manager Contact Phone: 907-265-6487 Date: Permit to Drill API Number: Permit Approval Number:Date: Conditions of approval : Samples req'd: Yes No Mud log req'd: Yes No H2S measures: Yes No Directional svy req'd: Yes No Spacing exception req'd: Yes No Inclination-only svy req'd: Yes No Post initial injection MIT req'd: Yes No APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng Greater Mooses Tooth Rendezvous 7/15/2023 5165' to AA081806 N/A 728 sx of 13.0 ppg Ext. Class G + 730 sx of 15.8 ppg Class G Cement to surface with 10 yds slurry 1318 sx of 11.0 ppg DeepCRETE + 330 sx of 15.8 ppg Class G 366 sx of 15.8 ppg Class G 2836 If checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: 21. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Authorized Title: Authorized Signature: Brad Gorham Commission Use Only See cover letter for other requirements. Perforation Depth MD (ft): Perforation Depth TVD (ft): Liner Production Intermediate Surface Conductor/Structural Casing Length Size Cement Volume MD Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): 18. Casing Program:Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks (including stage data) 3641 P.O. Box 100360 Anchorage, Alaska, 99510-0360 1069 FSL, 2049 FWL, S32 T10N R2E, UM AA081800, AA081803, AA081805 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 ConocoPhillips 59-52-180 MT7-94 1952 FSL, 1810 FWL, S25 T10N R1E, UM 932535000, 932538000, 932540000 174 FSL, 115 FEL, S10 T10N R1E, UM 3776, 5756, 5756 GL / BF Elevation above MSL (ft): Form 10-401 Revised 3/2021 This permit is valid for 24 months from the date of approval per 20 AAC 25.005(g)  By Grace Christianson at 9:45 am, May 24, 2023 VTL 7/04/2023 223-049 7/9/2023 X Service - WAG 50-103-20858-00-00 MDG 7/3/2023 DSR-5/24/23 Initial BOP test to 5000 psig; subsequent BOP test to 3500 psig Annular preventer test to 2500 psig BOP test to 3000 psig approved while drilling the Int1 section The alternate BOP configuration attached while drilling the Int 1 is approved Diverter variance granted per 20 AAC 25.035(h)(2) Waiver for CPAI Rotary BOPE Test Frequency applies according to order OTH-21-018 extension attached Intermediate II cement evaluation may use SonicScope under the attached Conditions of Approval Surface casing LOT and annular LOT to the AOGCC as soon as available. GCW 07/05/2021 07/05/23 07/05/23 Brett W. Huber, Sr.Digitally signed by Brett W. Huber, Sr. Date: 2023.07.05 15:18:48 -08'00' Žƒ•ƒ‹Žƒ† ƒ• ‘•‡”˜ƒ–‹‘‘‹••‹‘ 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov March 2, 2023 Mr. Luke Lawrence Wells Manager ConocoPhillips Alaska 700 G Street Anchorage, AK 99501 Re: Docket Number: OTH-21-018 CPAI Rotary Rig BOPE Test Frequency Dear Mr. Lawrence: By letter dated January 12, 2023, ConocoPhillips Alaska, Inc. (CPAI) requested a continuance of the waiver granted under Docket OTH-21-018 allowing certain CPAI rotary drilling rigs to test blowout prevention equipment (BOPE) on a 21-day test schedule. The Alaska Oil and Gas Conservation Commission (AOGCC) grants CPAI’s request for a limited duration and scope. OTH-21-018 approved the 21-day test interval for a 1-year period which expired on January 25, 2023. The AOGCC approved an extension to the pilot program by electronic mail on February 6, 2023, to accommodate review of the July-December 2022 BOPE Between Wells Maintenance Report (received January 27, 2023, and revised February 3, 2023). AOGCC met with CPAI on February 22, 2023 to discuss the Between Wells Maintenance Report and BOPE performance of the CPAI-operated rigs during 2022 in considering the requested continuance.1 During the past year, CPAI-operated rigs Doyon 25 and Doyon 26 were authorized to participate in the pilot – the other rigs working for CPAI failed to meet the conditions for testing BOPE at 21- day intervals.2 CPAI’s request to continue the pilot project allowing BOPE testing on a 21-day interval is approved for drilling rigs Doyon 25 and Doyon 26, with the following conditions: - The pilot test duration is for ONE year from the approval date of this letter, subject to potential extension and expansion to include other CPAI operated rigs with at least 3 months of continuous rig work and AOGCC review of a rig’s BOPE system reliability. 1 AOGCC approval of the Between Wells Maintenance program has enabled CPAI workover rigs to extend the interval between BOPE tests from every 7 days to not exceeding 14 days and was also part of the justification for allowing certain rigs to test BOPE on a 21-day interval. CPAI data shows the BWM has reduced the number of component failures during BOPE testing by replacing components that indicate suspect integrity before those components fail during testing. 2 Doyon 26 has additionally been approved (Permit-to-Drill) to test BOPE on an event-basis instead of at pre- determined time intervals while drilling specific sections in an ultra-extended reach well. Docket Number: OTH-21-018 March 2, 2023 Page 2 of 2 - CPAI must continue to implement the BWM program as approved by AOGCC. - Development drilling wells only are included in this approval. - The initial test after rigging up BOPE to drill a well must be to the rated working pressure as provided in API Standard 53. - CPAI is encouraged to take advantage of opportunities to test. - CPAI must adhere to original equipment manufacturer recommendations and replacement parts for BOPE. - Requests for extensions beyond 21 days must include justification with supporting information demonstrating the additional time is necessary for well control purposes or to mitigate a stuck drill string. - 48-hour advance notice for a BOPE test shall be provided to AOGCC for opportunity to witness. If you have questions regarding this, please contact Jim Regg at (907) 793-1236. Sincerely, Brett W. Huber, Sr. Chair, Commissioner cc: Greg Hobbs (CPAI) Mike Kneale (CPAI) Victoria Loepp (AOGCC) AOGCC Inspectors (email) Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.03.02 11:09:23 -09'00' 'DdDdϳͲϵϰ Conditions of Approval: Approval is granted to run the LWD-Sonic on upcoming well with the following provisions: 1. CPAI will provide a written log evaluation/interpretation to the AOGCC along with the log as soon as they become available. The evaluation is to include/highlight the intervals of competent cement that CPAI is using to meet the objective requirements for annular isolation, reservoir isolation, or confining zone isolation etc. Providing the log without an evaluation/interpretation is not acceptable. 2. LWD sonic logs must show free pipe and Top of Cement, just as the e-line log does. CPAI must start the log at a depth to ensure the free pipe above the TOC is captured as well as the TOC. Starting the log below the actual TOC based on calculations predicting a different TOC will not be acceptable. 3. CPAI will provide a cement job summary report and evaluation along with the cement log and evaluation to the AOGCC when they become available 4. CPAI will provide the results of the FIT when available. 5. Depending on the cement job results indicated by the cement job report, the logs and the FIT, remedial measures or additional logging may be required. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Gorham, Brad To:Guhl, Meredith D (OGC); Hobbs, Greg S Cc:Loepp, Victoria T (OGC); Davies, Stephen F (OGC); Roby, David S (OGC) Subject:RE: [EXTERNAL]GMTU MT7-94, PTD 223-049: Formation tops and pre-production? Date:Friday, June 30, 2023 4:25:08 PM Meredith, Please see below for the formation tops: Formation X Y TVDSS TVD (KB=139.5)MD Perma_Frost 1430126.22 5915692.38 -840 979.5 984.87 C40 1430107.34 5915711.12 -943 1082.58 1091.34 C30 1430013.63 5915788.62 -1276 1415.86 1446.48 C20 1429918.91 5915857.19 -1501 1640.56 1699.92 C10 1429705.07 5915998.5 -1853 1992.87 2136.27 K3 1428358.69 5916780.51 -2835 2974.81 3989.9 SCP 1428320.11 5916802.47 -2858 2997.81 4039.9 Albian_97 1427363.87 5917346.85 -3428 3567.95 5279.22 Albian_96 1427044.19 5917528.84 -3619 3758.56 5693.55 Albian_95 1426714.28 5917716.66 -3816 3955.26 6121.12 Albian_94 1426070.9 5918082.92 -4199 4338.87 6954.97 Albian_93 1425225.95 5918563.94 -4703 4842.66 8050.05 Sub Albian_93 1424804.84 5918803.68 -4954 5093.74 8595.84 Albian_92 1423151.81 5919744.73 -5940 6079.34 10738.22 Albian_91 1423055.61 5919799.5 -5997 6136.69 10862.9 FCS_HRZ 1422733.78 5919982.71 -6189 6328.58 11280 Susitna 1422641.43 5920035.29 -6244 6383.65 11399.7 HRZ 1421099.54 5920916.17 -7164 7303.11 13399.5 INT1 1421061.59 5920939.51 -7186 7325.81 13449.5 LCU 1420776.83 5921114.64 -7357 7496.15 13824.71 Alpine_D 1419710.3 5922052.34 -7948 8087.64 15386.53 INT2 1419685.31 5922094.34 -7959 8098.19 15436.53 Alpine_C 1419612.16 5922220.91 -7989 8128.2 15585.79 As far as pre-production is concerned, it is my understanding that the well will not be pre-produced, just flowed back to clean the well up prior to injection. Please let me know if you have any other questions or need any additional information. Thanks, Brad From: Guhl, Meredith D (OGC) <meredith.guhl@alaska.gov> Sent: Friday, June 30, 2023 3:09 PM To: Gorham, Brad <Brad.Gorham@conocophillips.com>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> Cc: Loepp, Victoria T (OGC) <victoria.loepp@alaska.gov>; Davies, Stephen F (OGC) <steve.davies@alaska.gov>; Roby, David S (OGC) <dave.roby@alaska.gov> Subject: [EXTERNAL]GMTU MT7-94, PTD 223-049: Formation tops and pre-production? CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hello Brad, I’m reviewing the permit to drill package for GMTU MT7-94 and I cannot locate a list of formation tops with MD/TVD measurements. On the previous GMTU permit (MT7-14) the formation tops were provided on the Plan Summary in a box labeled Formation Top Details, but on MT7-94, that box is blank. Could you please provide a list of formation tops with MD and/or TVD depths? Also, will MT7-94 be pre-produced or will it just be flowed back for cleanup? If the well will be pre- produced, how long does ConocoPhillips anticipate that lasting? Thank you, Meredith Meredith Guhl (she/her) Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 meredith.guhl@alaska.gov Direct: (907) 793-1235 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.guhl@alaska.gov. ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, AK 99510-0360 Telephone 907-276-1215 May 23, 2023 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Re: Application for Permit to Drill MT7-94 Dear Sir or Madam, ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore Alpine C Sand - Single Lateral Injector from the MT7 drilling pad. The intended spud date for this well is July 15, 2023. It is intended that Doyon 25 be used to drill the well. MT7-94 will drill a 16” surface hole reaching total depth above the K3 sand. 13-3/8” casing will be run and cemented to surface. The 12-1/4” intermediate 1 hole section will be drillied to the top of the HRZ formation. 9- 5/8” will be run and cemented in place with a 500’ or 250’ TVD column of cement above the highest hydrocarbon bearing zone per AOGCC regulation. If an additional hydrocarbon zone is present, a 2 nd stage cement job will be performed to cover 50’ TVD above and below the interval. The 8-1/2” x 9-7/8” intermediate 2 hole section will be drilled to and landed in the Alpine D. A 7” liner will be set and cemented from total depth to secure the shoe and cover 500’ or 250’ TVD above any hydrocarbon bearing zone.The 6-1/8” production interval will drilled horizontally and geo-steered within the Alpine C sand. The well will be completed with a 4-1/2" cemented liner including frac sleeves and swell packers. The upper completion run from surface will include a production packer and GLM’s. It is requested that a variance from the diverter requirement under 20 AAC 25.035 (h) (2) is granted. At MT7 there has been no significant indication of shallow gas or gas hydrates through the surface hole interval. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 Application for Permit to Drill per 20 ACC 25.005 (a) 2. Proposed drilling program 3. Proposed drilling fluids program summary 4. Proposed completion diagram 5. Pressure information as required by 20 ACC 25.005 (c) (4) (a-c) 6. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) 7. Area of Review Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact Brad Gorham at 907-265-6487 (Brad.Gorham@conocophillips.com) or Greg Hobbs at 907-263-4749 (greg.s.hobbs@conocophillips.com). Regards, Brad Gorham Staff Drilling Engineer cc: MT7-94 Well File / Jenna Taylor ATO 1732 David Lee ATO 1552 Chris Brillon ATO 1548 Andy Mack Kuukpik Corp *Recommend granting requested variance: no shallow gas or gas hydrates reported in nearby recently drilled wells. This will be the 18th well drilled from this pad. MDG 7/3/2023 variance from the diverter requirement under 20 AAC 25.035 (h)(2) * MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 1 | 20 MT7-94 Well Plan Application for Permit to Drill Table of Contents 1. Well Name ............................................................................................................................................. 2 2. Location Summary ................................................................................................................................. 2 3. Proposed Drilling Program ..................................................................................................................... 5 4. Diverter and BOP Information ................................................................................................................ 7 5. MASP Calculations ................................................................................................................................. 7 6. Procedure for Conducting Formation Integrity Tests ............................................................................... 9 7. Casing and Cementing Program .............................................................................................................. 9 8. Drilling Fluid Program .......................................................................................................................... 11 9. Abnormally Pressured Formation Information ...................................................................................... 12 10. Seismic Analysis ................................................................................................................................... 12 11. Seabed Condition Analysis ................................................................................................................... 12 12. Evidence of Bonding ............................................................................................................................. 12 13. Discussion of Mud and Cuttings Disposal and Annular Disposal ............................................................ 13 14. Drilling Hazards Summary .................................................................................................................... 14 15. Proposed Completion Schematic .......................................................................................................... 16 16. MT7-14 Intermediate 1 MPSP Review & Ram Configuration ................................................................. 17 17. Area of Review..................................................................................................................................... 20 MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 2 | 20 1. Well Name Requirements of 20 AAC 25.005 (f) The well for which this application is submitted will be designated as MT7-94 2. Location Summary Requirements of 20 AAC 25.005(c)(2) Location at Surface 887 FSL, 1714 FWL, S32 T10N R2E, UM NAD27 Northing: 5915718.15 Easting: 289794.45 RKB Elevation 38.9’ AMSL Pad Elevation 100.6’ AMSL Top of Productive Horizon (Heel) 1010 FNL, 1689 FWL, S32 T10N R2E, UM NAD27 Northing: 5919100.74 Easting: 289851.28 Measured Depth, RKB: 13449‘ MD True Vertical Depth, RKB: 7326‘ TVD True Vertical Depth, SS: 7187‘ TVDss Total Depth (Toe) 391 FSL, 1083 FWL, S04 T9N R2E, UM NAD27 Northing: 294295.47 Easting: 5909812.43 Measured Depth, RKB: 31253‘ MD True Vertical Depth, RKB: 8049‘ TVD True Vertical Depth, SS: 7909‘ TVDss Please see attached well stick diagram for the current planned development of the pad. MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 3 | 20 Pad Layout Well Stick Diagram MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 4 | 20 Well Plat MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 5 | 20 3. Proposed Drilling Program 1. MIRU Doyon 25 onto well over pre-installed 20” insulated conductor. Install diverter and function test. 2. Rig up and test riser, dewater cellar as needed. 3. Drill 16” hole to the surface casing point as per the directional plan, with KSI WBM. (LWD Program: GR/RES). 4. Run and cement new 13-3/8” surface casing to surface. Results of the cement operation will be submitted as soon as possible. 5. Install BOPE with the following equipment/configuration: 13-5/8” annular preventer, 9-5/8” FBR’s, blind ram and 2-7/8” x 5-1/2” VBR’s. x See section 16 for ram configuration justification. 6. Test BOPE to 250 psi low / 5,000 psi high (24-48 hr. regulatory notice). 7. Pick up and run in hole with 12-1/4” drilling BHA to drill intermediate #1. (LWD Program : GR/RES, DEN/NEU/IMAGE) 8. Chart casing pressure test to 3,500 psi for 30 minutes. 9. Drill out shoe track and 20’ of new hole. 10. Perform LOT to maximum EMW of 18.5 ppg. Minimum LOT required to drill ahead is 12.5 ppg EMW. 11. Displace well to 11 ppg WBM. 12. Drill ahead to below Sub-Albian 93 formation. Circulate wellbore clean and POOH. 13. RU and obtain MDT samples and rotary side wall cores in the Sub-Ablian 93 formation. 14. Rig down logging equipment and tools. 15. PU and run in hole with 12-1/4” drilling BHA. 16. Drill ahead to 500’ before the FCS Fill. Weight up to 12.0 ppg. 17. Drill 12-1/4” hole to the casing point. 18. Circulate wellbore clean and POOH. 19. Run 9-5/8” intermediate 1 casing to TD. 20. Pump single stage cement job to isolate the casing shoe or 500’ MD above uppermost hydrocarbon bearing zone. Note that a shallower hydrocarbon bearing sand may be encountered, and a 2nd stage cement job will be completed if the one is detected while drilling. Results of the cement operation will be submitted as soon as possible. x There is potential for the presence of the Tusk sand, which may be hydrocarbon bearing and require a second stage cement job to place cement 50’ TVD above and below the interval. The required equipment and cement plans are prepared if this becomes necessary. 21. Change upper 9-5/8” solid body rams to 2-7/8” x 5-1/2” VBR’s. Test BOPE to 250/3,500 psi. (24-48 hr. regulatory notice). 22. Pick up and run in hole with 8-1/2" x 9-7/8” drilling BHA to drill intermediate hole. SimOps, perform 9- 5/8” annulus LOT with Ball mill and freeze protect. MDT samples and rotary side wall cores in the Sub-Ablian 93 formation. There is potential for the presence of the Tusk sand, which may be hydrocarbon bearing and require a second stage cement job to place cement 50’ TVD above and below the interval. T MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 6 | 20 23. Chart casing pressure test to 3,500 psi for 30 minutes. 24. Drill out shoe track and 20’ of new hole. 25. Perform FIT to 14 ppg EMW. Minimum required to drill ahead is 11 ppg EMW. 26. Drill 8-1/2" x 9-7/8” hole to section TD. x As an identified contingency plan: If Casing Drilling is required due to Geologic Instability in the intermediate 2 hole section, refer to below steps: 1. Pick up and run in hole with the 7” steerable drilling liner. Pick up and stab in 6” pilot BHA assembly. (LWD Program: GR/RES). 2. RIH to bottom with 7” SDL on 5” drill pipe. 3. Drill 7” SDL hole to production casing point into the Alpine C sand using Managed Pressure Drilling to maintain constant bottom hole pressure on connections. (LWD Program: GR/RES). 4. Land 7” liner at TD. Disconnect SDL and POOH to surface with inner string and pilot. 5. Run in hole with inner string cementing BHA. Stab into liner. Circulate and condition mud in preparations for cementing. 6. Cement 7” liner to top of liner. Set liner top packer. Circulate excess cement from top of liner. POOH laying down 5” drill pipe. 7. Continue to Step 28 below. 27. Circulate wellbore clean and POOH. 28. Change out upper rams to 4” x 7” VBRs. Test same to 250 psi low / 3,500 psi high. 29. Pick up and run in hole with the 7” liner on 5” DP to section TD. 30. Circulate and condition mud in preparation for cementing. 31. Cement 7” liner to required TOC. Set liner top packer. POOH laying down 5” drill pipe. Results of the cement operation will be submitted as soon as possible. 32. Change out upper rams to 2-7/8” x 5-1/2” VBRs. Test same to 250 psi low / 3,500 psi high. 33. Pick up 4” DP. Test BOPE to 250 psi low / 3,500 psi high. (24-48 hr. regulatory notice). 34. Pick up and RIH with 6-1/8” drilling assembly. 35. Displace well to FloPro WBM. Chart casing pressure test to 3,500 psi for 30 minutes and record results. 36. Drill out and perform FIT to 13.5 ppg EMW maximum. Minimum acceptable leak-off for drilling ahead is 10.3 ppg EMW. 37. Drill 6-1/8" horizontal hole to section TD (LWD Program: GR/RES/DEN/NEU/IMAGE). 38. Circulate the hole clean and POOH. 39. Run 4-1/2” liner on 4” DP, set liner hanger and packer. Chart casing pressure test 3,500 psi. POOH LD DP. 40.Run 4-1/2” tubing with production packer, DHG, GLMs and 2x landing nipples. Locate and space out tubing. Terminate TEC wire and land tubing hanger. 41. Pressure test hanger seals to 2500 psi. g Managed Pressure Drilling t MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 7 | 20 42. Drop ball & rod, pressure up and set production packer. 43. Pressure test tubing and IA and shear SOV. 44. Install BPV. ND BOPE and install tubing head adapter. Pressure test adapter to 5000 psi. 45. Install 10k frac tree and test. 46. Remove BPV and freeze protect well. 47. Secure well and RDMO. 4. Diverter and BOP Information Requirements of 20 AAC 25.005(c)(3 & 7) Please reference BOP and diverter schematics on file for Doyon 25 5. MASP Calculations Requirements of 20 AAC 25.005(c)(4) (A) maximum downhole pressure and maximum potential surface pressure; Maximum Potential Surface Pressure (MPSP) is determined as the lesser of: Method 1: surface pressure at breakdown of the formation casing seat with a gas gradient to the surface Method 2: formation pore pressure at the next casing point less a gas gradient to the surface Method 1 Method 2 ܯܲܵܲ = [(ܨܩ × 0.052 )െܩܽݏ ܩݎܽ݀݅݁݊ݐ] × ܸܶܦ ܯܲܵܲ = ܨܲܲ െ (ܩܽݏ ܩݎܽ݀݅݁݊ݐ) × ܸܶܦ Where: FG – Fracture gradient at the casing seat in lb/gal 0.052 – Conversion from lb/gal to psi/ft Gas Gradient – 0.1 psi/ft TVD – True Vertical Depth of casing seat in ft RKB Where: FPP – Formation Pore Pressure at the next casing point Gas Gradient – 0.1 psi/ft The following presents data used for calculation of Maximum Potential Surface Pressure (MPSP) while drilling: Section Hole Size Previous CSG Section TD MPSP psi MPSP MPSP Size MD TVD FG ppg Pore Pressure ppg | psi MD TVD Pore Pressure ppg | psi Method 1 psi Method 2 psi SURF 16" 20" 120 120 10.9 8.7 54 4040 2998 8.7 1,356 56 56 1,056 INT1 12-1/4" 13-3/8" 4040 2998 14.5 8.7 1,356 13449 7326 9.4 3,581 1,961 1,961 2,848 INT2 8-1/2" x 9-7/8" 9-5/8" 13449 7326 16.5 9.4 3,581 15439 8099 8.7 3,664 2,854 5,553 2,854 PROD 6-1/8" 7" 15439 8099 12.5 8.7 3,664 31253 8049 8.7 3,641 2,836 4,455 2,836 *Maximum potential pore pressure in the Susitna Sand if present (B) data on potential gas zones; MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 8 | 20 The planned wellbore is expected to enter the gas cap and the area is expected to be normally pressured (8.5-8.9 ppg). (C) data concerning potential causes of hole problems such as abnormally geo-pressured strata, lost circulation zones, and zones that have a propensity for differential sticking; Please see Drilling Hazards Summary The planned wellbore is expected to enter the gas cap and the area is expected to be normally pressured (8.5-8.9 ppg). MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 9 | 20 6. Procedure for Conducting Formation Integrity Tests Requirements of 20 AAC 25.005 (c)(5) Drill out casing shoe and perform LOT test or FIT in accordance with the Alpine LOT/FIT procedure that ConocoPhillips Alaska has on file with the Commission. 7. Casing and Cementing Program Requirements of 20 AAC 25.005 (c)(6) Casing and Cementing Program OD (in) Hole Size (in) Weight (lb/ft) Grade Conn. Cement Program 20 42 94 H40 Welded Cemented to surface with 10 yds slurry 13-3/8" 16" 68# L80 H563 Cement to Surface 9-5/8" 12-1/4" 47# T95 H563 250’ TVD or 500’ MD, whichever is greater, above highest significant hydrocarbon bearing zone 7" 8-1/2" x 9-7/8" 29# L80 H563 250’ TVD or 500’ MD, whichever is greater, above highest significant hydrocarbon bearing zone 4-1/2" 6-1/8" 12.6# P110S H563 Uncemented open hole liner with frac ports and swell packers 13-3/8" Surface Casing run to 4040' MD/ 2998' TVD Cement Plan: Cement from 4040’ MD to 3540’ (500’ of tail) with DeepCRETE + Adds @ 15.8 ppg, and from 3540' to surface with 11.0 ppg DeepCRETE. Assume 120% excess annular volume in permafrost and 50% excess below the permafrost (985’ MD), zero excess in 20” conductor. Lead 451 bbls => 1318 sx of 11.0 ppg DeepCRETE + Add's @ 1.92 ft³/sk Tail 68 bbls => 330 sx of 15.8 ppg Class G + Add's @ 1.16 ft³/sk 9-5/8" Intermediate Casing run to 13449' MD/ 7326' TVD Cement Plan: Primary cement job consists of 2000 ft 15.8 ppg tail slurry and top of 13.0 ppg lead slurry is designed to be at 11449’ MD, which is 250' TVD above the prognosed shallowest hydrocarbon bearing zone Sub-Albian 93. If a shallower hydrocarbon zone of producible volumes, is encountered while drilling, a 2nd stage cement job will be performed to isolate this zone. Assume 30% excess annular volume. Lead 246 bbls => 728 sx of 13.0 ppg Ext. Class G + Add's @ 1.9 ft³/sk Tail 151 bbls => 730 sx of 15.8 ppg Class G + Add's @ 1.16 ft³/sk 7" Intermediate Liner run to 15439' MD/ 8099' TVD Cement Plan: Top of slurry is designed to be at 14588’ MD, which is 250' TVD above the prognosed shallowest hydrocarbon bearing zone Alpine D. Assume 40% + 20 Additional bbls excess annular volume. Tail 76 bbls => 366 sx of 15.8 ppg Class G + Add's @ 1.16 ft³/sk MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 10 | 20 MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 11 | 20 8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) Surface Intermediate #1 Intermediate #2 Production Hole Size in 16" 12-1/4" 8-1/2" x 9-7/8" 6-1/8" Casing Size in 13-3/8" 9-5/8" 7" 4-1/2" Density ppg 10.5 – 11.5 10.0 – 12.0 10.0 – 13.0 8.8 – 9.5 PV cP 13 10 40 15 YP lb./100 ft2 35-50 20 - 28 20 - 35 15 - 20 Funnel Viscosity s/qt 200 40 - 50 70 - 90 60 - 80 Initial Gels lb./100 ft2 50 10 14 10 10 Minute Gels lb./100 ft2 60 15 42 15 API Fluid Loss cc/30 min N.C. – 15.0 N/A N/A 4 HPHT Fluid Loss cc/30 min n/a 8.0 – 12.0 5.0 10.0 pH 11.0 9.5 – 10.0 9.5 – 10.0 9.0 – 9.5 Surface Hole: A freshwater drilling fluid (KSI) will be used for the surface interval. Keep flow line viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight ч10.0 ppg by use of solids control system and dilutions where necessary. Intermediate #1: Fresh water polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. Maintain mud weight from 10-12.0 ppg and be prepared to add loss circulations materials as needed. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as needed) will all be important in maintaining wellbore stability. Intermediate #2: Versapro OBM will continue be used in this section for shale stability purpose. Ensure good hole cleaning by maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Ensure adequate LCM material is available on location and in the field to address any expected losses. Maintain mud weight from 10.0-12.0 ppg. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up before pulling out of the hole. Note: Managed Pressure Drilling (MPD) will be utilized for adding backpressure during connections to mitigate shale instability and cycling. Production Hole: The horizontal production interval will be drilled with water-based mud drill-in fluid weighted to 8.8-9.5 ppg. MPD will be used to hold back pressure, keeping the well dynamically balanced. Diagram of Doyon 25 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations. MPD will be used to hold back pressure, keeping the well dynamically balanced. MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 12 | 20 9. Abnormally Pressured Formation Information Requirements of 20 AAC 25.005 (c)(9) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis Requirements of 20 AAC 25.005 (c)(10) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis Requirements of 20 AAC 25.005 (c)(11) N/A - Application is not for an offshore well. 12. Evidence of Bonding Requirements of 20 AAC 25.005 (c)(12) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 13 | 20 13. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 AAC 25.005 (c)(14) Incidental fluids developed from drilling operations on well MT7-94 will be disposed of into a permitted annulus on the MT7 pad or hauled to the Class 1 disposal well on CD1. The MT7-94 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to ~2000' TVD. Significant hydrocarbon zones include only the Alpine sand based on pre-drill interpretations. Once MT7-94 has been drilled and completed, consideration may be given to permit this well for annular disposal. An application for Sundry Operations form 10-403 will then be filed. Annular disposal of fluids occurring due to drilling operations, per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular disposal. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the C10 formation, above the K3. These 450-500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be disposed of down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12 ppg for drilling fluid wastes. Using 12 ppg fluid and the rig’s specified maximum pumping pressure of 1500 psi for annular disposal, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure: [ (12 ppg) * (0.052) * (Surf. Shoe TVD) ] + 1500 psi [ (12 ppg) * (0.052) * (2998’) ] + 1500 psi Max Shoe Pressure = 3371 psi Pore Pressure: 1356 psi Therefore Differential Pressure: 3371 – 1356 = 2015 psi. The internal casing pressure is conservative since frictional losses while pumping has not been taken into consideration. The surface and intermediate casing strings exposed to annular disposal operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: OD Weight (ppf) Grade Range Conn. Collapse (psi) 85% of Collapse (psi) Burst (psi) 85% of Burst (psi) 13-3/8" 68# L80 3 H563 2260 1921 5020 4267 9-5/8" 47# T95 3 H563 5090 4327 8150 4573 MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 14 | 20 14. Drilling Hazards Summary 16" Hole | 13-3/8" Casing Interval Event Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low First well on Pad, traveling cylinder diagrams Gas Hydrates Low If observed – control drill, reduce pump rates and circulating time, reduce mud temperatures Clay Balling Medium Maintain planned mud parameters and flow rates, Increase mud weight, use weighted sweeps, reduce fluid viscosity, control ROP Abnormal Pressure Low Diverter drills, increased mud weight. Shallow hazard study noted minimal risk Lost Circulation Medium Reduce pump rates, mud rheology, add lost circulation material, use of low density cement slurries, port collar, control pipe running speeds 12-1/4" Hole | 9-5/8" Casing Interval Event Risk Level Mitigation Strategy Lost circulation Low Reduce pump rates, reduce trip speeds, real time ECD monitoring, mud rheology, add lost circulation material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, proper hole filling, pump out of hole, real time ECD monitoring, MPD stripping practices Abnormal Pressure in Overburden Formations Low Well control drills, check for flow during connections, increase mud weight. Shallow hazard study noted minimal risk Hole Cleaning Low Monitor ECD and torque/drag trends, control drill and use best hole cleaning practices 8-1/2" x 9-7/8" Hole | 7" Liner - Casing Interval Event Risk Level Mitigation Strategy Sloughing shale, Tight hole High MPD for shale stability, Steerable Drilling Liner, Increase mud weight, control ROP, connection and trip speeds, sweeps, and real time equivalent circulating density (ECD) monitoring, run casing as liner Lost circulation Low Reduce pump rates, reduce trip speeds, real time ECD monitoring, mud rheology, add lost circulation material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, proper hole filling, pump out of hole, real time ECD monitoring, Liner will be in place at TD Abnormal Reservoir Pressure Low Well control drills, check for flow during connections, increase mud weight Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers 6-1/8" Hole | 4-1/2" Liner - Horizontal Production Hole Event Risk Level Mitigation Strategy Lost circulation Low Reduce pump rates, reduce trip speeds, real time ECD monitoring, mud rheology, add lost circulation material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, proper hole filling, pump out of hole, real time ECD monitoring Abnormal Reservoir Pressure Low Well control drills, check for flow during connections, increased mud weight Differential Sticking Low Uniform reservoir pressure along lateral, keep pipe moving, control mud weight Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers To be posted in Rig Floor Doghouse Prior to Spud MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 15 | 20 Well Proximity Risks: MT7 will be a multi-well pad, containing an original plan of 36 wells. Directional drilling / collision avoidance information is provided in the following attachments. Drilling Area Risks: x Reservoir Pressure: Offset injection has the potential to increase reservoir pressure over predicted. Although this is unlikely, the rig will be prepared to weight up if required. Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the intermediate section. x Lower Shale Stability: HRZ/Kalubik/Miluveach in the pilot and intermediate 2 hole sections will require higher mud weights than historically used to enhance wellbore stability. Managed Pressure Drilling will be used in conjunction with a 4-string casing design to mitigate shale instability in the aforementioned formations. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation if needed. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 16 | 20 15. Proposed Completion Schematic MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 17 | 20 16. MT7-94 Intermediate 1 MPSP Review & Ram Configuration Proposal Requesting approval to use a BOPE stack equipped with an annular preventer, fixed 9-5/8” solid body rams, blind/shear rams and, variable rams (2-7/8” x 5-1/2”) while drilling and running casing in the Intermediate 1 section of MT7-94. The Maximum Potential Surface Pressure (MPSP) is expected to be 1961 psi while drilling the 12-1/4” Intermediate 1 hole section with 5” drill pipe, satisfying 20 AAC 25.035.e.1.A. Please find the review below for more detail. 20 AAC 25.035.e.1.A: For an operation with a maximum potential surface pressure of 3,000 psi or less, BOPE must have at least three preventers, including: i. One equipped with pipe rams that fit the size of drill pipe, tubing or casing begin used, except that pipe rams need not be sixed to bottom-hole assemblies and drill collars. ii. One with blind rams iii. One annular type Proposed Configuration: x Annular Preventer (iii) x 9-5/8” Solid Body Rams x Blind/Shear Rams (ii) x 2-7/8” x 5-1/2” VBR’s (i) MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 18 | 20 Pore Pressure Assessment A Normal Compaction Trend (NCT) is defined using the Bowers Method on a calibration well with little/no erosion and global constants as a starting point. Both source rock and non-source rock NCTs are then defined. For a given unit/zone, deviations slower than NCT indicate overpressure and allow calculation of its magnitude. The NCT for individual wells is defined by modifying Bowers parameters to account for specific erosion amounts. The maximum estimated reservoir pressure in the Intermediate 1 section is 9.4 ppg. Interval TVD Top TVD Base Max PPG Note Surface to Permafrost Base 0 977 8.3 Hydrostatic Permafrost Base to C40 977 1079 9.1 Hydrostatic C40 to C30 1079 1405 9.2 Rendezvous-2 DT Estimate C30 to C20 1405 1642 8.45 Hydrostatic C20 to C10 1642 1986 8.475 Hydrostatic C10 to K3 1986 2999 9.3 Rendezvous-2 DT Estimate K3 to Albian_97 2999 3607 8.55 Hydrostatic Albian 97 to Albian 96 3607 3788 8.56 Hydrostatic Albian 96 to Albian 95 3788 3972 8.56 Hydrostatic Albian 95 to Albian 94 (Tusk Sand if present) 3972 4240 8.56 Hydrostatic Albian 94 to Albian 93 4240 4895 8.57 Hydrostatic Albian 93 to Albian 92 4895 6061 8.6 Hydrostatic Albian 92 to Albian 91 6061 6121 8.6 Hydrostatic Albian 91 to HRZ (Susitna Sand if present) 6121 7396 9.4 Offset Well DT/ Res Estimates HRZ to LCU 7396 7591 11.6 Offset Well DT/ Res Estimates LCU to Alpine D 7591 8237 11.75 Offset Well DT/ Res Estimates Alpine D to Alpine C 8237 8263 11.4 MT7-04 Res Est. Alpine C to UJU 8263 8359 8.8 Offset MDT’s MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 19 | 20 Maximum Potential Surface Pressure Surface Casing Point: 4040' MD/ 2998' TVD Intermediate 1 Casing Point: 13449' MD/ 7326' TVD Max Anticipated Pore Pressure: 9.4 ppg | Albian 91 > HRZ Surface Casing Shoe FG: 14.5 ppg EMW | K3 Maximum Potential Surface Pressure (MPSP) is determined as the lesser of 1.) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2.) formation pore pressure at the next casing point less a gas gradient to the surface as follows: Method 1 Method 2 ܯܲܵܲ = [(ܨܩ × 0.052 )െܩܽݏ ܩݎܽ݀݅݁݊ݐ] × ܸܶܦ ܯܲܵܲ = ܨܲܲ െ (ܩܽݏ ܩݎܽ݀݅݁݊ݐ ×ܸܶܦ) Where: FG – Fracture gradient at the casing seat in lb/gal 0.052 – Conversion from lb/gal to psi/ft Gas Gradient – 0.1 psi/ft TVD – True Vertical Depth of casing seat in ft RKB Where: FPP – Formation Pore Pressure at the next casing point MPSP CALCULATIONS: Method 1: MPSP = [(FG x 0.052) – Gas Gradient] x TVD MPSP = [(14.5 ppg EMW x 0.052) - 0.1 psi/ft] x 2998 TVD MPSP = 1961 psi Method 2: MPSP = FPP – (Gas Gradient x TVD) MPSP = (9.4 ppg x .052 x 7326‘ TVD) x (0.1 psi/ft x 7326’ TVD) MPSP = 2848 psi MT7-94 AOGCC 10-401 APD 5/23/2023 MT7-94 AOGCC 10-401 APD 20 | 20 17. Area of Review There are currently no wells within a quarter mile radius of the MT7-94 wellbore. 39 500 500 1000 1000 1500 1500 2000 2000 2500 2500 3000 3000 3500 3500 8000 8000 15000 15000 31253 MT7-94_wp03 Plan Summary MT7-94_wp03 MT7-92_wp04 70inc 3.2dls MT7-14_wp07 MT7-GCEW1_wp01 MT7-08PB1 MT7-08 MT7-07 MT7-02 MT7-09 MT7-04 MT7-03 MT7-06MT7-06AMT7-06PB1 MT7-95_wp02 MT7-99 MT7-11 MT7-01 MT7-98 MT7-96 MT7-05 MT7-97 0 4 Dogleg Severity0 4500 9000 13500 18000 22500 27000 31500 Measured Depth 13-3/8" Surface Casing 9-5/8" Intermediate Casing 7" Intermediate Liner 50 50 100 100 0 90 180 270 30 210 60 240 120 300 150 330 Travelling Cylinder Azimuth (TFO+AZI) [°] vs Travelling Cylinder Separation [100 usft/in] MT7-92_wp04 70inc 3.2dls MT7-14_wp07 MT7-GCEW1_wp01 MT7-95_wp02 MT7-99MT7-98MT7-96MT7-97 0 4500 True Vertical Depth-27000 -22500 -18000 -13500 -9000 -4500 0 Vertical Section at 153.00° 13-3/8" Surface Casing 9-5/8" Intermediate Casing7" Intermediate Liner 0 55 110 Centre to Centre Separation0 4500 9000 13500 18000 22500 27000 31500 Measured Depth Equivalent Magnetic Distance DDI 7.408 SURVEY PROGRAM Date: 2023-03-27T00:00:00 Validated: Yes Version: Depth From Depth To Survey/Plan Tool 38.90 1000.00 MT7-94_wp03 (MT7-94) SDI_Keeper_ADK 1000.00 4040.00 MT7-94_wp03 (MT7-94) MWD+IFR2+SAG+MS 4040.00 13449.00 MT7-94_wp03 (MT7-94) MWD+IFR2+SAG+MS 13449.00 15439.00 MT7-94_wp03 (MT7-94) MWD+IFR2+SAG+MS 15439.00 31253.26 MT7-94_wp03 (MT7-94) MWD+IFR2+SAG+MS Surface Location North / 5915634.39 East / 1430168.90Ground / 100.60 CASING DETAILS TVD MD Name 2997.90 4040.00 13-3/8" Surface Casing 7326.04 13449.00 9-5/8" Intermediate Casing 8099.18 15439.00 7" Intermediate Liner 8048.55 31253.26 4-1/2" Production Liner Mag Model & Date: BGGM2023 01-Jul-23 Magnetic North is 13.99° East of True North (Magnetic Declination) Mag Dip & Field Strength: 80.36° 57097.30nT SECTION DETAILS Sec MD Inc Azi TVD +N/-S +E/-W Dleg TFace VSect Annotation 1 38.90 0.00 0.00 38.90 0.00 0.00 0.00 0.00 0.00 2 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 Start Build 1.50 3 500.00 3.00 325.00 499.91 4.29 -3.00 1.50 325.00 -5.18 Start Build 2.00 4 800.00 9.00 325.00 798.13 29.96 -20.98 2.00 0.00 -36.22 Start DLS 2.50 TFO -29.55 5 2986.92 62.61 298.06 2513.39 676.52 -1055.59 2.50 -29.55 -1082.01 Start 10234.27 hold at 2986.92 MD 6 13221.19 62.61 298.06 7222.07 4950.26 -9074.55 0.00 0.00 -8530.47 Start DLS 1.00 TFO 77.65 7 13398.54 63.00 300.00 7303.13 5026.80 -9212.47 1.00 77.65 -8661.29 Start 50.00 hold at 13398.54 MD 8 13448.54 63.00 300.00 7325.83 5049.08 -9251.05 0.00 0.00 -8698.65 Start 902.00 hold at 13448.54 MD 9 14350.54 63.00 300.00 7735.33 5450.92 -9947.07 0.00 0.00 -9372.68 Start DLS 2.88 TFO 65.68 10 15389.30 77.83 327.67 8088.70 6126.69 -10635.00 2.88 65.68 -10287.11 Start 50.00 hold at 15389.30 MD 11 15439.30 77.83 327.67 8099.24 6167.99 -10661.14 0.00 0.00 -10335.77 Start 50.00 hold at 15439.30 MD 12 15489.30 77.83 327.67 8109.79 6209.29 -10687.27 0.00 0.00 -10384.44 Start DLS 2.80 TFO 50.68 13 15701.75 81.63 332.32 8147.69 6390.26 -10791.72 2.80 50.68 -10593.10 Start 230.61 hold at 15701.75 MD 14 15932.37 81.63 332.32 8181.26 6592.31 -10897.71 0.00 0.00 -10821.24 Start DLS 2.80 TFO 4.36 15 16253.29 90.59 333.00 8203.01 6876.44 -11044.60 2.80 4.36 -11141.09 Start 14999.96 hold at 16253.29 MD 16 31253.26 90.59 333.00 8048.55 20240.79 -17854.08 0.00 0.00 -26140.26 TD at 31253.26 FORMATION TOP DETAILS No formation data is available By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all surroundingwells are assigned to the proper position, and I approve the scan and collision avoidance plan as set out in the audit pack.I approve it as the basiis for the final well plan and wellsite drawings. I also acknowledge that unless notified otherwise all targets have a 100 feet lateral tolerance. Prepared by Checked by Accepted by Approved by Plan KB (100.6 GL + 38.9 DF) @ 139.50usft Plan View Project: Western North Slope Site:GMT2 Rendezvous Pad Well: MT7-94 Wellbore: MT7-94 Design: MT7-94_wp03 -14000 0 14000 South(-)/North(+) (7000 usft/in)-28000 -14000 0 14000 28000 West(-)/East(+) (7000 usft/in) MT7-94 Target 2 1320ft MT7-94 Target 1 1320ft M T 7 -9 2 _w p 04 7 0 in c 3 .2d ls M T7 -14_w p 0 7MT7-GCEW1_wp01MT7 -0 8 P B1 M T 7-08 MT7-0 7 MT 7 -02 MT7 -09 MT7-0 4 M T 7-03 MT 7 -0 6 MT7-0 6 A MT7-0 6 P B 1 MT7 -9 5_w p0 2 M T 7-99 MT7-1 1 MT7-01PB1MT7-0 1 M T7-98MT 7 -96MT7-0 5 M T7 -9 7 13-3/8" Surface Casing9-5/8" Intermediate Casing 7" Intermediate Liner 4-1/2" Production Liner 50010001500200025003000350040004500500055006000650070007500800080 49 M T7-9 4 _w p03 0 6000 12000True Vertical Depth (3000 usft/in)-24000 -18000 -12000 -6000 0 Vertical Section at 153.00° (3000 usft/in) 13-3/8" Surface Casing 9-5/8" Intermediate Casing 7" Intermediate Liner 4-1/2" Production Liner 1000 20 0 0 3 0 0 0 4 0 0 05 0 0 0 6 0 0 0 7 0 0 08 0 0 0 9 0 0 0 1 0 0 0 0 1 10 0 0 1 2 0 0 0 1 3 0 0 0 1 40 0 015 00016000170001800019000200002100022000230002400025000260002700028000290003000031000MT7-94/MT7-94_wp03Start Build 1.50 Start Build 2.00 Start DLS 2.50 TFO -29.55 Start 10234.27 hold at 2986.92 MD Start DLS 1.00 TFO 77.65 Start 50.00 hold at 13398.54 MD Start 902.00 hold at 13448.54 MD Start DLS 2.88 TFO 65.68 Start 50.00 hold at 15389.30 MD Start 50.00 hold at 15439.30 MD Start DLS 2.80 TFO 50.68 Start 230.61 hold at 15701.75 MD Start DLS 2.80 TFO 4.36 Start 14999.96 hold at 16253.29 MD TD at 31253.26 Section View Project: Western North Slope Site:GMT2 Rendezvous Pad Well: MT7-94 Wellbore: MT7-94 Design: MT7-94_wp03 Standard Proposal Report 01 May, 2023 Plan: MT7-94_wp03 ConocoPhillips Alaska Inc_WNS Western North Slope GMT2 Rendezvous Pad MT7-94 MT7-94 ConocoPhillips Standard Proposal Report Well MT7-94Local Co-ordinate Reference:Database:EDT 17 Alaska Prod Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:Western North SlopeProject: TrueNorth Reference:GMT2 Rendezvous PadSite: Minimum CurvatureSurvey Calculation Method:MT7-94Well: MT7-94Wellbore: MT7-94_wp03Design: Map System: Geo Datum: Project Map Zone: System Datum:US State Plane 1983 North American Datum 1983 Western North Slope, North Slope Alaska, United States Alaska Zone 4 Mean Sea Level Using Well Reference Point Using geodetic scale factor Site Position: From: Site Latitude: Longitude: Position Uncertainty: Northing: Easting: Grid Convergence: GMT2 Rendezvous Pad Map -1.59 °Slot Radius:13.200 in 5,915,580.00 usft 1,430,062.00 usft 0.00 usft 70° 10' 22.674 N 151° 41' 36.331 W Well Well Position Longitude: Latitude: Easting: Northing: +E/-W +N/-S Position Uncertainty Ground Level: MT7-94 5,915,634.39 usft 1,430,168.90 usft 100.60 usftWellhead Elevation:0.00 usft 70° 10' 23.238 N 151° 41' 33.278 W 57.34 usft 105.35 usft Wellbore Declination (°) Field Strength (nT) Sample Date Dip Angle (°) MT7-94 Model NameMagnetics BGGM2023 7/1/2023 13.99 80.36 57,097.30 Phase:Version: Audit Notes: Design MT7-94_wp03 PLAN Vertical Section: Depth From (TVD) (usft) +N/-S (usft) Direction (°) +E/-W (usft) Tie On Depth:38.90 153.000.000.0038.90 Depth From (usft) Plan Survey Tool Program RemarksTool NameSurvey (Wellbore) Depth To (usft) Date 5/1/2023 SDI_Keeper_ADK SDI Keeper All-Attitude Drop MT7-94_wp03 (MT7-94)38.90 1,000.001 MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag MT7-94_wp03 (MT7-94)1,000.00 4,040.002 MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag MT7-94_wp03 (MT7-94)4,040.00 13,449.003 MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag MT7-94_wp03 (MT7-94)13,449.00 15,439.004 MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag MT7-94_wp03 (MT7-94)15,439.00 31,253.265 5/1/2023 11:03:33AM COMPASS 5000.17 Build Page 2 ConocoPhillips Standard Proposal Report Well MT7-94Local Co-ordinate Reference:Database:EDT 17 Alaska Prod Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:Western North SlopeProject: TrueNorth Reference:GMT2 Rendezvous PadSite: Minimum CurvatureSurvey Calculation Method:MT7-94Well: MT7-94Wellbore: MT7-94_wp03Design: Inclination (°) Azimuth (°) +E/-W (usft) TFO (°) +N/-S (usft) Measured Depth (usft) Vertical Depth (usft) Dogleg Rate (°/100usft) Build Rate (°/100usft) Turn Rate (°/100usft) Plan Sections Target 0.000.000.000.000.000.0038.900.000.0038.90 0.000.000.000.000.000.00300.000.000.00300.00 325.000.001.501.50-3.004.29499.91325.003.00500.00 0.000.002.002.00-20.9829.96798.13325.009.00800.00 -29.55-1.232.452.50-1,055.59676.522,513.39298.0662.612,986.92 0.000.000.000.00-9,074.554,950.267,222.07298.0662.6113,221.19 77.651.100.221.00-9,212.475,026.807,303.13300.0063.0013,398.54 0.000.000.000.00-9,251.055,049.087,325.83300.0063.0013,448.54 0.000.000.000.00-9,947.075,450.927,735.33300.0063.0014,350.54 65.682.661.432.88-10,635.006,126.698,088.70327.6777.8315,389.30 0.000.000.000.00-10,661.146,167.998,099.24327.6777.8315,439.30 0.000.000.000.00-10,687.276,209.298,109.79327.6777.8315,489.30 50.682.191.792.80-10,791.726,390.268,147.69332.3281.6315,701.75 0.000.000.000.00-10,897.716,592.318,181.26332.3281.6315,932.37 4.360.212.792.80-11,044.606,876.448,203.01333.0090.5916,253.29 MT7-94 Target 1 13 0.000.000.000.00-17,854.0820,240.798,048.55333.0090.5931,253.26 MT7-94 Target 2 13 5/1/2023 11:03:33AM COMPASS 5000.17 Build Page 3 ConocoPhillips Standard Proposal Report Well MT7-94Local Co-ordinate Reference:Database:EDT 17 Alaska Prod Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:Western North SlopeProject: TrueNorth Reference:GMT2 Rendezvous PadSite: Minimum CurvatureSurvey Calculation Method:MT7-94Well: MT7-94Wellbore: MT7-94_wp03Design: Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Vertical Section (usft) Dogleg Rate (°/100usft) +N/-S (usft) Build Rate (°/100usft) Turn Rate (°/100usft) Planned Survey Vertical Depth (usft) 100.00 0.00 0.00 100.00 0.00 0.000.00 0.00 0.00 0.00 200.00 0.00 0.00 200.00 0.00 0.000.00 0.00 0.00 0.00 300.00 0.00 0.00 300.00 0.00 0.000.00 0.00 0.00 0.00 Start Build 1.50 400.00 1.50 325.00 399.99 -1.30 1.501.07 -0.75 1.50 0.00 500.00 3.00 325.00 499.91 -5.18 1.504.29 -3.00 1.50 0.00 Start Build 2.00 600.00 5.00 325.00 599.66 -12.09 2.0010.00 -7.00 2.00 0.00 700.00 7.00 325.00 699.11 -22.44 2.0018.56 -13.00 2.00 0.00 800.00 9.00 325.00 798.13 -36.22 2.0029.96 -20.98 2.00 0.00 Start DLS 2.50 TFO -29.55 900.00 11.24 318.67 896.57 -53.42 2.5043.69 -31.91 2.24 -6.33 1,000.00 13.57 314.45 994.23 -73.99 2.5059.23 -46.72 2.33 -4.22 1,100.00 15.96 311.46 1,090.92 -97.90 2.5076.55 -65.41 2.38 -2.99 1,200.00 18.37 309.23 1,186.46 -125.11 2.5095.62 -87.91 2.41 -2.23 1,300.00 20.80 307.51 1,280.67 -155.56 2.50116.40 -114.21 2.43 -1.72 1,400.00 23.25 306.13 1,373.37 -189.20 2.50138.85 -144.24 2.45 -1.38 1,500.00 25.70 305.01 1,464.38 -225.96 2.50162.93 -177.94 2.46 -1.13 1,600.00 28.17 304.07 1,553.52 -265.77 2.50188.60 -215.26 2.46 -0.94 1,700.00 30.64 303.26 1,640.63 -308.56 2.50215.80 -256.12 2.47 -0.80 1,800.00 33.11 302.57 1,725.55 -354.24 2.50244.48 -300.45 2.47 -0.69 1,900.00 35.59 301.97 1,808.11 -402.73 2.50274.59 -348.16 2.48 -0.61 2,000.00 38.06 301.43 1,888.15 -453.93 2.50306.08 -399.16 2.48 -0.54 2,100.00 40.55 300.95 1,965.52 -507.75 2.50338.87 -453.35 2.48 -0.48 2,200.00 43.03 300.51 2,040.08 -564.09 2.50372.91 -510.62 2.48 -0.43 2,300.00 45.51 300.12 2,111.68 -622.83 2.50408.14 -570.88 2.48 -0.40 2,400.00 48.00 299.75 2,180.18 -683.87 2.50444.48 -634.01 2.49 -0.36 2,500.00 50.49 299.42 2,245.46 -747.09 2.50481.87 -699.88 2.49 -0.34 2,600.00 52.97 299.10 2,307.39 -812.37 2.50520.24 -768.37 2.49 -0.31 2,700.00 55.46 298.81 2,365.86 -879.58 2.50559.51 -839.35 2.49 -0.29 2,800.00 57.95 298.53 2,420.74 -948.61 2.50599.61 -912.68 2.49 -0.28 2,900.00 60.44 298.27 2,471.95 -1,019.30 2.50640.46 -988.23 2.49 -0.26 2,986.92 62.61 298.06 2,513.39 -1,082.01 2.50676.52 -1,055.59 2.49 -0.25 Start 10234.27 hold at 2986.92 MD 3,000.00 62.61 298.06 2,519.41 -1,091.53 0.00681.99 -1,065.83 0.00 0.00 3,100.00 62.61 298.06 2,565.41 -1,164.31 0.00723.74 -1,144.19 0.00 0.00 3,200.00 62.61 298.06 2,611.42 -1,237.09 0.00765.50 -1,222.54 0.00 0.00 3,300.00 62.61 298.06 2,657.43 -1,309.87 0.00807.26 -1,300.90 0.00 0.00 3,400.00 62.61 298.06 2,703.44 -1,382.65 0.00849.02 -1,379.25 0.00 0.00 3,500.00 62.61 298.06 2,749.45 -1,455.43 0.00890.78 -1,457.60 0.00 0.00 3,600.00 62.61 298.06 2,795.46 -1,528.21 0.00932.54 -1,535.96 0.00 0.00 3,700.00 62.61 298.06 2,841.47 -1,600.99 0.00974.30 -1,614.31 0.00 0.00 3,800.00 62.61 298.06 2,887.48 -1,673.77 0.001,016.06 -1,692.67 0.00 0.00 3,900.00 62.61 298.06 2,933.49 -1,746.55 0.001,057.82 -1,771.02 0.00 0.00 4,000.00 62.61 298.06 2,979.49 -1,819.33 0.001,099.58 -1,849.38 0.00 0.00 4,040.00 62.61 298.06 2,997.90 -1,848.44 0.001,116.28 -1,880.72 0.00 0.00 13-3/8" Surface Casing 4,100.00 62.61 298.06 3,025.50 -1,892.11 0.001,141.33 -1,927.73 0.00 0.00 4,200.00 62.61 298.06 3,071.51 -1,964.89 0.001,183.09 -2,006.08 0.00 0.00 4,300.00 62.61 298.06 3,117.52 -2,037.67 0.001,224.85 -2,084.44 0.00 0.00 4,400.00 62.61 298.06 3,163.53 -2,110.45 0.001,266.61 -2,162.79 0.00 0.00 4,500.00 62.61 298.06 3,209.54 -2,183.23 0.001,308.37 -2,241.15 0.00 0.00 4,600.00 62.61 298.06 3,255.55 -2,256.01 0.001,350.13 -2,319.50 0.00 0.00 4,700.00 62.61 298.06 3,301.56 -2,328.79 0.001,391.89 -2,397.85 0.00 0.00 5/1/2023 11:03:33AM COMPASS 5000.17 Build Page 4 ConocoPhillips Standard Proposal Report Well MT7-94Local Co-ordinate Reference:Database:EDT 17 Alaska Prod Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:Western North SlopeProject: TrueNorth Reference:GMT2 Rendezvous PadSite: Minimum CurvatureSurvey Calculation Method:MT7-94Well: MT7-94Wellbore: MT7-94_wp03Design: Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Vertical Section (usft) Dogleg Rate (°/100usft) +N/-S (usft) Build Rate (°/100usft) Turn Rate (°/100usft) Planned Survey Vertical Depth (usft) 4,800.00 62.61 298.06 3,347.57 -2,401.56 0.001,433.65 -2,476.21 0.00 0.00 4,900.00 62.61 298.06 3,393.58 -2,474.34 0.001,475.41 -2,554.56 0.00 0.00 5,000.00 62.61 298.06 3,439.58 -2,547.12 0.001,517.17 -2,632.92 0.00 0.00 5,100.00 62.61 298.06 3,485.59 -2,619.90 0.001,558.93 -2,711.27 0.00 0.00 5,200.00 62.61 298.06 3,531.60 -2,692.68 0.001,600.68 -2,789.62 0.00 0.00 5,300.00 62.61 298.06 3,577.61 -2,765.46 0.001,642.44 -2,867.98 0.00 0.00 5,400.00 62.61 298.06 3,623.62 -2,838.24 0.001,684.20 -2,946.33 0.00 0.00 5,500.00 62.61 298.06 3,669.63 -2,911.02 0.001,725.96 -3,024.69 0.00 0.00 5,600.00 62.61 298.06 3,715.64 -2,983.80 0.001,767.72 -3,103.04 0.00 0.00 5,700.00 62.61 298.06 3,761.65 -3,056.58 0.001,809.48 -3,181.39 0.00 0.00 5,800.00 62.61 298.06 3,807.66 -3,129.36 0.001,851.24 -3,259.75 0.00 0.00 5,900.00 62.61 298.06 3,853.66 -3,202.14 0.001,893.00 -3,338.10 0.00 0.00 6,000.00 62.61 298.06 3,899.67 -3,274.92 0.001,934.76 -3,416.46 0.00 0.00 6,100.00 62.61 298.06 3,945.68 -3,347.70 0.001,976.52 -3,494.81 0.00 0.00 6,200.00 62.61 298.06 3,991.69 -3,420.48 0.002,018.28 -3,573.16 0.00 0.00 6,300.00 62.61 298.06 4,037.70 -3,493.26 0.002,060.03 -3,651.52 0.00 0.00 6,400.00 62.61 298.06 4,083.71 -3,566.04 0.002,101.79 -3,729.87 0.00 0.00 6,500.00 62.61 298.06 4,129.72 -3,638.82 0.002,143.55 -3,808.23 0.00 0.00 6,600.00 62.61 298.06 4,175.73 -3,711.60 0.002,185.31 -3,886.58 0.00 0.00 6,700.00 62.61 298.06 4,221.74 -3,784.38 0.002,227.07 -3,964.93 0.00 0.00 6,800.00 62.61 298.06 4,267.75 -3,857.16 0.002,268.83 -4,043.29 0.00 0.00 6,900.00 62.61 298.06 4,313.75 -3,929.94 0.002,310.59 -4,121.64 0.00 0.00 7,000.00 62.61 298.06 4,359.76 -4,002.72 0.002,352.35 -4,200.00 0.00 0.00 7,100.00 62.61 298.06 4,405.77 -4,075.50 0.002,394.11 -4,278.35 0.00 0.00 7,200.00 62.61 298.06 4,451.78 -4,148.28 0.002,435.87 -4,356.71 0.00 0.00 7,300.00 62.61 298.06 4,497.79 -4,221.05 0.002,477.62 -4,435.06 0.00 0.00 7,400.00 62.61 298.06 4,543.80 -4,293.83 0.002,519.38 -4,513.41 0.00 0.00 7,500.00 62.61 298.06 4,589.81 -4,366.61 0.002,561.14 -4,591.77 0.00 0.00 7,600.00 62.61 298.06 4,635.82 -4,439.39 0.002,602.90 -4,670.12 0.00 0.00 7,700.00 62.61 298.06 4,681.83 -4,512.17 0.002,644.66 -4,748.48 0.00 0.00 7,800.00 62.61 298.06 4,727.83 -4,584.95 0.002,686.42 -4,826.83 0.00 0.00 7,900.00 62.61 298.06 4,773.84 -4,657.73 0.002,728.18 -4,905.18 0.00 0.00 8,000.00 62.61 298.06 4,819.85 -4,730.51 0.002,769.94 -4,983.54 0.00 0.00 8,100.00 62.61 298.06 4,865.86 -4,803.29 0.002,811.70 -5,061.89 0.00 0.00 8,200.00 62.61 298.06 4,911.87 -4,876.07 0.002,853.46 -5,140.25 0.00 0.00 8,300.00 62.61 298.06 4,957.88 -4,948.85 0.002,895.22 -5,218.60 0.00 0.00 8,400.00 62.61 298.06 5,003.89 -5,021.63 0.002,936.97 -5,296.95 0.00 0.00 8,500.00 62.61 298.06 5,049.90 -5,094.41 0.002,978.73 -5,375.31 0.00 0.00 8,600.00 62.61 298.06 5,095.91 -5,167.19 0.003,020.49 -5,453.66 0.00 0.00 8,700.00 62.61 298.06 5,141.91 -5,239.97 0.003,062.25 -5,532.02 0.00 0.00 8,800.00 62.61 298.06 5,187.92 -5,312.75 0.003,104.01 -5,610.37 0.00 0.00 8,900.00 62.61 298.06 5,233.93 -5,385.53 0.003,145.77 -5,688.72 0.00 0.00 9,000.00 62.61 298.06 5,279.94 -5,458.31 0.003,187.53 -5,767.08 0.00 0.00 9,100.00 62.61 298.06 5,325.95 -5,531.09 0.003,229.29 -5,845.43 0.00 0.00 9,200.00 62.61 298.06 5,371.96 -5,603.87 0.003,271.05 -5,923.79 0.00 0.00 9,300.00 62.61 298.06 5,417.97 -5,676.65 0.003,312.81 -6,002.14 0.00 0.00 9,400.00 62.61 298.06 5,463.98 -5,749.43 0.003,354.57 -6,080.49 0.00 0.00 9,500.00 62.61 298.06 5,509.99 -5,822.21 0.003,396.32 -6,158.85 0.00 0.00 9,600.00 62.61 298.06 5,556.00 -5,894.99 0.003,438.08 -6,237.20 0.00 0.00 9,700.00 62.61 298.06 5,602.00 -5,967.76 0.003,479.84 -6,315.56 0.00 0.00 9,800.00 62.61 298.06 5,648.01 -6,040.54 0.003,521.60 -6,393.91 0.00 0.00 9,900.00 62.61 298.06 5,694.02 -6,113.32 0.003,563.36 -6,472.26 0.00 0.00 10,000.00 62.61 298.06 5,740.03 -6,186.10 0.003,605.12 -6,550.62 0.00 0.00 10,100.00 62.61 298.06 5,786.04 -6,258.88 0.003,646.88 -6,628.97 0.00 0.00 5/1/2023 11:03:33AM COMPASS 5000.17 Build Page 5 ConocoPhillips Standard Proposal Report Well MT7-94Local Co-ordinate Reference:Database:EDT 17 Alaska Prod Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:Western North SlopeProject: TrueNorth Reference:GMT2 Rendezvous PadSite: Minimum CurvatureSurvey Calculation Method:MT7-94Well: MT7-94Wellbore: MT7-94_wp03Design: Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Vertical Section (usft) Dogleg Rate (°/100usft) +N/-S (usft) Build Rate (°/100usft) Turn Rate (°/100usft) Planned Survey Vertical Depth (usft) 10,200.00 62.61 298.06 5,832.05 -6,331.66 0.003,688.64 -6,707.33 0.00 0.00 10,300.00 62.61 298.06 5,878.06 -6,404.44 0.003,730.40 -6,785.68 0.00 0.00 10,400.00 62.61 298.06 5,924.07 -6,477.22 0.003,772.16 -6,864.04 0.00 0.00 10,500.00 62.61 298.06 5,970.08 -6,550.00 0.003,813.91 -6,942.39 0.00 0.00 10,600.00 62.61 298.06 6,016.08 -6,622.78 0.003,855.67 -7,020.74 0.00 0.00 10,700.00 62.61 298.06 6,062.09 -6,695.56 0.003,897.43 -7,099.10 0.00 0.00 10,800.00 62.61 298.06 6,108.10 -6,768.34 0.003,939.19 -7,177.45 0.00 0.00 10,900.00 62.61 298.06 6,154.11 -6,841.12 0.003,980.95 -7,255.81 0.00 0.00 11,000.00 62.61 298.06 6,200.12 -6,913.90 0.004,022.71 -7,334.16 0.00 0.00 11,100.00 62.61 298.06 6,246.13 -6,986.68 0.004,064.47 -7,412.51 0.00 0.00 11,200.00 62.61 298.06 6,292.14 -7,059.46 0.004,106.23 -7,490.87 0.00 0.00 11,300.00 62.61 298.06 6,338.15 -7,132.24 0.004,147.99 -7,569.22 0.00 0.00 11,400.00 62.61 298.06 6,384.16 -7,205.02 0.004,189.75 -7,647.58 0.00 0.00 11,500.00 62.61 298.06 6,430.17 -7,277.80 0.004,231.51 -7,725.93 0.00 0.00 11,600.00 62.61 298.06 6,476.17 -7,350.58 0.004,273.26 -7,804.28 0.00 0.00 11,700.00 62.61 298.06 6,522.18 -7,423.36 0.004,315.02 -7,882.64 0.00 0.00 11,800.00 62.61 298.06 6,568.19 -7,496.14 0.004,356.78 -7,960.99 0.00 0.00 11,900.00 62.61 298.06 6,614.20 -7,568.92 0.004,398.54 -8,039.35 0.00 0.00 12,000.00 62.61 298.06 6,660.21 -7,641.70 0.004,440.30 -8,117.70 0.00 0.00 12,100.00 62.61 298.06 6,706.22 -7,714.48 0.004,482.06 -8,196.05 0.00 0.00 12,200.00 62.61 298.06 6,752.23 -7,787.25 0.004,523.82 -8,274.41 0.00 0.00 12,300.00 62.61 298.06 6,798.24 -7,860.03 0.004,565.58 -8,352.76 0.00 0.00 12,400.00 62.61 298.06 6,844.25 -7,932.81 0.004,607.34 -8,431.12 0.00 0.00 12,500.00 62.61 298.06 6,890.25 -8,005.59 0.004,649.10 -8,509.47 0.00 0.00 12,600.00 62.61 298.06 6,936.26 -8,078.37 0.004,690.85 -8,587.82 0.00 0.00 12,700.00 62.61 298.06 6,982.27 -8,151.15 0.004,732.61 -8,666.18 0.00 0.00 12,800.00 62.61 298.06 7,028.28 -8,223.93 0.004,774.37 -8,744.53 0.00 0.00 12,900.00 62.61 298.06 7,074.29 -8,296.71 0.004,816.13 -8,822.89 0.00 0.00 13,000.00 62.61 298.06 7,120.30 -8,369.49 0.004,857.89 -8,901.24 0.00 0.00 13,100.00 62.61 298.06 7,166.31 -8,442.27 0.004,899.65 -8,979.59 0.00 0.00 13,200.00 62.61 298.06 7,212.32 -8,515.05 0.004,941.41 -9,057.95 0.00 0.00 13,221.19 62.61 298.06 7,222.07 -8,530.47 0.004,950.26 -9,074.55 0.00 0.00 Start DLS 1.00 TFO 77.65 13,300.00 62.78 298.92 7,258.22 -8,588.18 1.004,983.66 -9,136.10 0.22 1.10 13,398.54 63.00 300.00 7,303.13 -8,661.29 1.005,026.80 -9,212.47 0.22 1.09 Start 50.00 hold at 13398.54 MD 13,400.00 63.00 300.00 7,303.79 -8,662.37 0.005,027.45 -9,213.59 0.00 0.00 13,448.54 63.00 300.00 7,325.83 -8,698.65 0.005,049.08 -9,251.05 0.00 0.00 Start 902.00 hold at 13448.54 MD 13,449.00 63.00 300.00 7,326.04 -8,698.99 0.005,049.28 -9,251.40 0.00 0.00 9-5/8" Intermediate Casing 13,500.00 63.00 300.00 7,349.19 -8,737.10 0.005,072.00 -9,290.76 0.00 0.00 13,600.00 63.00 300.00 7,394.59 -8,811.83 0.005,116.55 -9,367.92 0.00 0.00 13,700.00 63.00 300.00 7,439.99 -8,886.55 0.005,161.10 -9,445.09 0.00 0.00 13,800.00 63.00 300.00 7,485.39 -8,961.28 0.005,205.65 -9,522.25 0.00 0.00 13,900.00 63.00 300.00 7,530.79 -9,036.01 0.005,250.20 -9,599.41 0.00 0.00 14,000.00 63.00 300.00 7,576.19 -9,110.73 0.005,294.75 -9,676.58 0.00 0.00 14,100.00 63.00 300.00 7,621.59 -9,185.46 0.005,339.30 -9,753.74 0.00 0.00 14,200.00 63.00 300.00 7,666.98 -9,260.18 0.005,383.85 -9,830.90 0.00 0.00 14,300.00 63.00 300.00 7,712.38 -9,334.91 0.005,428.40 -9,908.07 0.00 0.00 14,350.54 63.00 300.00 7,735.33 -9,372.68 0.005,450.92 -9,947.07 0.00 0.00 Start DLS 2.88 TFO 65.68 14,400.00 63.59 301.45 7,757.55 -9,410.03 2.885,473.49 -9,985.04 1.20 2.93 5/1/2023 11:03:33AM COMPASS 5000.17 Build Page 6 ConocoPhillips Standard Proposal Report Well MT7-94Local Co-ordinate Reference:Database:EDT 17 Alaska Prod Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:Western North SlopeProject: TrueNorth Reference:GMT2 Rendezvous PadSite: Minimum CurvatureSurvey Calculation Method:MT7-94Well: MT7-94Wellbore: MT7-94_wp03Design: Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Vertical Section (usft) Dogleg Rate (°/100usft) +N/-S (usft) Build Rate (°/100usft) Turn Rate (°/100usft) Planned Survey Vertical Depth (usft) 14,500.00 64.84 304.33 7,801.06 -9,487.92 2.885,522.39 -10,060.64 1.24 2.88 14,600.00 66.13 307.15 7,842.56 -9,568.79 2.885,575.53 -10,134.47 1.30 2.82 14,700.00 67.48 309.91 7,881.95 -9,652.44 2.885,632.79 -10,206.36 1.35 2.76 14,800.00 68.87 312.62 7,919.13 -9,738.67 2.885,694.03 -10,276.12 1.39 2.71 14,900.00 70.31 315.28 7,954.00 -9,827.26 2.885,759.08 -10,343.57 1.44 2.66 15,000.00 71.79 317.89 7,986.48 -9,917.97 2.885,827.78 -10,408.55 1.47 2.61 15,100.00 73.30 320.46 8,016.49 -10,010.60 2.885,899.96 -10,470.90 1.51 2.57 15,200.00 74.84 322.99 8,043.95 -10,104.89 2.885,975.45 -10,530.45 1.54 2.53 15,300.00 76.40 325.48 8,068.78 -10,200.61 2.886,054.04 -10,587.05 1.57 2.49 15,389.30 77.83 327.67 8,088.70 -10,287.11 2.886,126.69 -10,635.00 1.59 2.46 Start 50.00 hold at 15389.30 MD 15,400.00 77.83 327.67 8,090.96 -10,297.52 0.006,135.53 -10,640.59 0.00 0.00 15,439.00 77.83 327.67 8,099.18 -10,335.48 0.006,167.74 -10,660.98 0.00 0.00 7" Intermediate Liner 15,439.30 77.83 327.67 8,099.24 -10,335.77 0.006,167.99 -10,661.14 0.00 0.00 Start 50.00 hold at 15439.30 MD 15,489.30 77.83 327.67 8,109.79 -10,384.44 0.006,209.29 -10,687.27 0.00 0.00 Start DLS 2.80 TFO 50.68 15,500.00 78.02 327.91 8,112.03 -10,394.86 2.806,218.14 -10,692.85 1.78 2.21 15,600.00 79.80 330.11 8,131.27 -10,492.74 2.806,302.26 -10,743.37 1.78 2.20 15,700.00 81.60 332.28 8,147.43 -10,591.37 2.806,388.72 -10,790.91 1.80 2.17 15,701.75 81.63 332.32 8,147.69 -10,593.10 2.806,390.26 -10,791.72 1.81 2.16 Start 230.61 hold at 15701.75 MD 15,800.00 81.63 332.32 8,161.99 -10,690.29 0.006,476.34 -10,836.87 0.00 0.00 15,900.00 81.63 332.32 8,176.55 -10,789.22 0.006,563.95 -10,882.83 0.00 0.00 15,932.37 81.63 332.32 8,181.26 -10,821.24 0.006,592.31 -10,897.71 0.00 0.00 Start DLS 2.80 TFO 4.36 16,000.00 83.52 332.46 8,190.00 -10,888.30 2.806,651.73 -10,928.78 2.79 0.21 16,100.00 86.31 332.68 8,198.86 -10,987.89 2.806,740.13 -10,974.66 2.79 0.21 16,200.00 89.10 332.89 8,202.87 -11,087.80 2.806,828.98 -11,020.36 2.79 0.21 16,253.29 90.59 333.00 8,203.01 -11,141.09 2.806,876.44 -11,044.60 2.79 0.21 Start 14999.96 hold at 16253.29 MD 16,300.00 90.59 333.00 8,202.53 -11,187.80 0.006,918.05 -11,065.80 0.00 0.00 16,400.00 90.59 333.00 8,201.50 -11,287.79 0.007,007.15 -11,111.20 0.00 0.00 16,500.00 90.59 333.00 8,200.47 -11,387.79 0.007,096.25 -11,156.59 0.00 0.00 16,600.00 90.59 333.00 8,199.44 -11,487.78 0.007,185.34 -11,201.99 0.00 0.00 16,700.00 90.59 333.00 8,198.41 -11,587.78 0.007,274.44 -11,247.39 0.00 0.00 16,800.00 90.59 333.00 8,197.38 -11,687.77 0.007,363.53 -11,292.78 0.00 0.00 16,900.00 90.59 333.00 8,196.35 -11,787.77 0.007,452.63 -11,338.18 0.00 0.00 17,000.00 90.59 333.00 8,195.32 -11,887.76 0.007,541.73 -11,383.58 0.00 0.00 17,100.00 90.59 333.00 8,194.29 -11,987.76 0.007,630.82 -11,428.97 0.00 0.00 17,200.00 90.59 333.00 8,193.26 -12,087.75 0.007,719.92 -11,474.37 0.00 0.00 17,300.00 90.59 333.00 8,192.23 -12,187.75 0.007,809.01 -11,519.77 0.00 0.00 17,400.00 90.59 333.00 8,191.20 -12,287.74 0.007,898.11 -11,565.16 0.00 0.00 17,500.00 90.59 333.00 8,190.17 -12,387.74 0.007,987.20 -11,610.56 0.00 0.00 17,600.00 90.59 333.00 8,189.14 -12,487.73 0.008,076.30 -11,655.96 0.00 0.00 17,700.00 90.59 333.00 8,188.11 -12,587.72 0.008,165.40 -11,701.35 0.00 0.00 17,800.00 90.59 333.00 8,187.08 -12,687.72 0.008,254.49 -11,746.75 0.00 0.00 17,900.00 90.59 333.00 8,186.05 -12,787.71 0.008,343.59 -11,792.15 0.00 0.00 18,000.00 90.59 333.00 8,185.02 -12,887.71 0.008,432.68 -11,837.54 0.00 0.00 18,100.00 90.59 333.00 8,183.99 -12,987.70 0.008,521.78 -11,882.94 0.00 0.00 18,200.00 90.59 333.00 8,182.96 -13,087.70 0.008,610.88 -11,928.34 0.00 0.00 18,300.00 90.59 333.00 8,181.93 -13,187.69 0.008,699.97 -11,973.73 0.00 0.00 5/1/2023 11:03:33AM COMPASS 5000.17 Build Page 7 ConocoPhillips Standard Proposal Report Well MT7-94Local Co-ordinate Reference:Database:EDT 17 Alaska Prod Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:Western North SlopeProject: TrueNorth Reference:GMT2 Rendezvous PadSite: Minimum CurvatureSurvey Calculation Method:MT7-94Well: MT7-94Wellbore: MT7-94_wp03Design: Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Vertical Section (usft) Dogleg Rate (°/100usft) +N/-S (usft) Build Rate (°/100usft) Turn Rate (°/100usft) Planned Survey Vertical Depth (usft) 18,400.00 90.59 333.00 8,180.90 -13,287.69 0.008,789.07 -12,019.13 0.00 0.00 18,500.00 90.59 333.00 8,179.88 -13,387.68 0.008,878.16 -12,064.53 0.00 0.00 18,600.00 90.59 333.00 8,178.85 -13,487.68 0.008,967.26 -12,109.92 0.00 0.00 18,700.00 90.59 333.00 8,177.82 -13,587.67 0.009,056.36 -12,155.32 0.00 0.00 18,800.00 90.59 333.00 8,176.79 -13,687.67 0.009,145.45 -12,200.72 0.00 0.00 18,900.00 90.59 333.00 8,175.76 -13,787.66 0.009,234.55 -12,246.11 0.00 0.00 19,000.00 90.59 333.00 8,174.73 -13,887.66 0.009,323.64 -12,291.51 0.00 0.00 19,100.00 90.59 333.00 8,173.70 -13,987.65 0.009,412.74 -12,336.91 0.00 0.00 19,200.00 90.59 333.00 8,172.67 -14,087.65 0.009,501.84 -12,382.30 0.00 0.00 19,300.00 90.59 333.00 8,171.64 -14,187.64 0.009,590.93 -12,427.70 0.00 0.00 19,400.00 90.59 333.00 8,170.61 -14,287.63 0.009,680.03 -12,473.10 0.00 0.00 19,500.00 90.59 333.00 8,169.58 -14,387.63 0.009,769.12 -12,518.49 0.00 0.00 19,600.00 90.59 333.00 8,168.55 -14,487.62 0.009,858.22 -12,563.89 0.00 0.00 19,700.00 90.59 333.00 8,167.52 -14,587.62 0.009,947.31 -12,609.29 0.00 0.00 19,800.00 90.59 333.00 8,166.49 -14,687.61 0.0010,036.41 -12,654.68 0.00 0.00 19,900.00 90.59 333.00 8,165.46 -14,787.61 0.0010,125.51 -12,700.08 0.00 0.00 20,000.00 90.59 333.00 8,164.43 -14,887.60 0.0010,214.60 -12,745.48 0.00 0.00 20,100.00 90.59 333.00 8,163.40 -14,987.60 0.0010,303.70 -12,790.87 0.00 0.00 20,200.00 90.59 333.00 8,162.37 -15,087.59 0.0010,392.79 -12,836.27 0.00 0.00 20,300.00 90.59 333.00 8,161.34 -15,187.59 0.0010,481.89 -12,881.67 0.00 0.00 20,400.00 90.59 333.00 8,160.31 -15,287.58 0.0010,570.99 -12,927.06 0.00 0.00 20,500.00 90.59 333.00 8,159.28 -15,387.58 0.0010,660.08 -12,972.46 0.00 0.00 20,600.00 90.59 333.00 8,158.25 -15,487.57 0.0010,749.18 -13,017.86 0.00 0.00 20,700.00 90.59 333.00 8,157.22 -15,587.57 0.0010,838.27 -13,063.25 0.00 0.00 20,800.00 90.59 333.00 8,156.19 -15,687.56 0.0010,927.37 -13,108.65 0.00 0.00 20,900.00 90.59 333.00 8,155.16 -15,787.56 0.0011,016.47 -13,154.05 0.00 0.00 21,000.00 90.59 333.00 8,154.13 -15,887.55 0.0011,105.56 -13,199.44 0.00 0.00 21,100.00 90.59 333.00 8,153.10 -15,987.54 0.0011,194.66 -13,244.84 0.00 0.00 21,200.00 90.59 333.00 8,152.07 -16,087.54 0.0011,283.75 -13,290.24 0.00 0.00 21,300.00 90.59 333.00 8,151.04 -16,187.53 0.0011,372.85 -13,335.63 0.00 0.00 21,400.00 90.59 333.00 8,150.01 -16,287.53 0.0011,461.95 -13,381.03 0.00 0.00 21,500.00 90.59 333.00 8,148.98 -16,387.52 0.0011,551.04 -13,426.43 0.00 0.00 21,600.00 90.59 333.00 8,147.95 -16,487.52 0.0011,640.14 -13,471.82 0.00 0.00 21,700.00 90.59 333.00 8,146.92 -16,587.51 0.0011,729.23 -13,517.22 0.00 0.00 21,800.00 90.59 333.00 8,145.89 -16,687.51 0.0011,818.33 -13,562.62 0.00 0.00 21,900.00 90.59 333.00 8,144.86 -16,787.50 0.0011,907.42 -13,608.01 0.00 0.00 22,000.00 90.59 333.00 8,143.83 -16,887.50 0.0011,996.52 -13,653.41 0.00 0.00 22,100.00 90.59 333.00 8,142.80 -16,987.49 0.0012,085.62 -13,698.81 0.00 0.00 22,200.00 90.59 333.00 8,141.77 -17,087.49 0.0012,174.71 -13,744.20 0.00 0.00 22,300.00 90.59 333.00 8,140.75 -17,187.48 0.0012,263.81 -13,789.60 0.00 0.00 22,400.00 90.59 333.00 8,139.72 -17,287.48 0.0012,352.90 -13,835.00 0.00 0.00 22,500.00 90.59 333.00 8,138.69 -17,387.47 0.0012,442.00 -13,880.39 0.00 0.00 22,600.00 90.59 333.00 8,137.66 -17,487.47 0.0012,531.10 -13,925.79 0.00 0.00 22,700.00 90.59 333.00 8,136.63 -17,587.46 0.0012,620.19 -13,971.19 0.00 0.00 22,800.00 90.59 333.00 8,135.60 -17,687.45 0.0012,709.29 -14,016.58 0.00 0.00 22,900.00 90.59 333.00 8,134.57 -17,787.45 0.0012,798.38 -14,061.98 0.00 0.00 23,000.00 90.59 333.00 8,133.54 -17,887.44 0.0012,887.48 -14,107.38 0.00 0.00 23,100.00 90.59 333.00 8,132.51 -17,987.44 0.0012,976.58 -14,152.77 0.00 0.00 23,200.00 90.59 333.00 8,131.48 -18,087.43 0.0013,065.67 -14,198.17 0.00 0.00 23,300.00 90.59 333.00 8,130.45 -18,187.43 0.0013,154.77 -14,243.57 0.00 0.00 23,400.00 90.59 333.00 8,129.42 -18,287.42 0.0013,243.86 -14,288.96 0.00 0.00 23,500.00 90.59 333.00 8,128.39 -18,387.42 0.0013,332.96 -14,334.36 0.00 0.00 23,600.00 90.59 333.00 8,127.36 -18,487.41 0.0013,422.06 -14,379.76 0.00 0.00 23,700.00 90.59 333.00 8,126.33 -18,587.41 0.0013,511.15 -14,425.15 0.00 0.00 5/1/2023 11:03:33AM COMPASS 5000.17 Build Page 8 ConocoPhillips Standard Proposal Report Well MT7-94Local Co-ordinate Reference:Database:EDT 17 Alaska Prod Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:Western North SlopeProject: TrueNorth Reference:GMT2 Rendezvous PadSite: Minimum CurvatureSurvey Calculation Method:MT7-94Well: MT7-94Wellbore: MT7-94_wp03Design: Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Vertical Section (usft) Dogleg Rate (°/100usft) +N/-S (usft) Build Rate (°/100usft) Turn Rate (°/100usft) Planned Survey Vertical Depth (usft) 23,800.00 90.59 333.00 8,125.30 -18,687.40 0.0013,600.25 -14,470.55 0.00 0.00 23,900.00 90.59 333.00 8,124.27 -18,787.40 0.0013,689.34 -14,515.95 0.00 0.00 24,000.00 90.59 333.00 8,123.24 -18,887.39 0.0013,778.44 -14,561.34 0.00 0.00 24,100.00 90.59 333.00 8,122.21 -18,987.39 0.0013,867.53 -14,606.74 0.00 0.00 24,200.00 90.59 333.00 8,121.18 -19,087.38 0.0013,956.63 -14,652.14 0.00 0.00 24,300.00 90.59 333.00 8,120.15 -19,187.38 0.0014,045.73 -14,697.53 0.00 0.00 24,400.00 90.59 333.00 8,119.12 -19,287.37 0.0014,134.82 -14,742.93 0.00 0.00 24,500.00 90.59 333.00 8,118.09 -19,387.36 0.0014,223.92 -14,788.33 0.00 0.00 24,600.00 90.59 333.00 8,117.06 -19,487.36 0.0014,313.01 -14,833.72 0.00 0.00 24,700.00 90.59 333.00 8,116.03 -19,587.35 0.0014,402.11 -14,879.12 0.00 0.00 24,800.00 90.59 333.00 8,115.00 -19,687.35 0.0014,491.21 -14,924.52 0.00 0.00 24,900.00 90.59 333.00 8,113.97 -19,787.34 0.0014,580.30 -14,969.91 0.00 0.00 25,000.00 90.59 333.00 8,112.94 -19,887.34 0.0014,669.40 -15,015.31 0.00 0.00 25,100.00 90.59 333.00 8,111.91 -19,987.33 0.0014,758.49 -15,060.71 0.00 0.00 25,200.00 90.59 333.00 8,110.88 -20,087.33 0.0014,847.59 -15,106.10 0.00 0.00 25,300.00 90.59 333.00 8,109.85 -20,187.32 0.0014,936.69 -15,151.50 0.00 0.00 25,400.00 90.59 333.00 8,108.82 -20,287.32 0.0015,025.78 -15,196.90 0.00 0.00 25,500.00 90.59 333.00 8,107.79 -20,387.31 0.0015,114.88 -15,242.29 0.00 0.00 25,600.00 90.59 333.00 8,106.76 -20,487.31 0.0015,203.97 -15,287.69 0.00 0.00 25,700.00 90.59 333.00 8,105.73 -20,587.30 0.0015,293.07 -15,333.09 0.00 0.00 25,800.00 90.59 333.00 8,104.70 -20,687.30 0.0015,382.17 -15,378.48 0.00 0.00 25,900.00 90.59 333.00 8,103.67 -20,787.29 0.0015,471.26 -15,423.88 0.00 0.00 26,000.00 90.59 333.00 8,102.64 -20,887.29 0.0015,560.36 -15,469.28 0.00 0.00 26,100.00 90.59 333.00 8,101.62 -20,987.28 0.0015,649.45 -15,514.67 0.00 0.00 26,200.00 90.59 333.00 8,100.59 -21,087.27 0.0015,738.55 -15,560.07 0.00 0.00 26,300.00 90.59 333.00 8,099.56 -21,187.27 0.0015,827.64 -15,605.47 0.00 0.00 26,400.00 90.59 333.00 8,098.53 -21,287.26 0.0015,916.74 -15,650.86 0.00 0.00 26,500.00 90.59 333.00 8,097.50 -21,387.26 0.0016,005.84 -15,696.26 0.00 0.00 26,600.00 90.59 333.00 8,096.47 -21,487.25 0.0016,094.93 -15,741.66 0.00 0.00 26,700.00 90.59 333.00 8,095.44 -21,587.25 0.0016,184.03 -15,787.05 0.00 0.00 26,800.00 90.59 333.00 8,094.41 -21,687.24 0.0016,273.12 -15,832.45 0.00 0.00 26,900.00 90.59 333.00 8,093.38 -21,787.24 0.0016,362.22 -15,877.85 0.00 0.00 27,000.00 90.59 333.00 8,092.35 -21,887.23 0.0016,451.32 -15,923.24 0.00 0.00 27,100.00 90.59 333.00 8,091.32 -21,987.23 0.0016,540.41 -15,968.64 0.00 0.00 27,200.00 90.59 333.00 8,090.29 -22,087.22 0.0016,629.51 -16,014.04 0.00 0.00 27,300.00 90.59 333.00 8,089.26 -22,187.22 0.0016,718.60 -16,059.43 0.00 0.00 27,400.00 90.59 333.00 8,088.23 -22,287.21 0.0016,807.70 -16,104.83 0.00 0.00 27,500.00 90.59 333.00 8,087.20 -22,387.21 0.0016,896.80 -16,150.23 0.00 0.00 27,600.00 90.59 333.00 8,086.17 -22,487.20 0.0016,985.89 -16,195.62 0.00 0.00 27,700.00 90.59 333.00 8,085.14 -22,587.19 0.0017,074.99 -16,241.02 0.00 0.00 27,800.00 90.59 333.00 8,084.11 -22,687.19 0.0017,164.08 -16,286.42 0.00 0.00 27,900.00 90.59 333.00 8,083.08 -22,787.18 0.0017,253.18 -16,331.81 0.00 0.00 28,000.00 90.59 333.00 8,082.05 -22,887.18 0.0017,342.28 -16,377.21 0.00 0.00 28,100.00 90.59 333.00 8,081.02 -22,987.17 0.0017,431.37 -16,422.61 0.00 0.00 28,200.00 90.59 333.00 8,079.99 -23,087.17 0.0017,520.47 -16,468.00 0.00 0.00 28,300.00 90.59 333.00 8,078.96 -23,187.16 0.0017,609.56 -16,513.40 0.00 0.00 28,400.00 90.59 333.00 8,077.93 -23,287.16 0.0017,698.66 -16,558.80 0.00 0.00 28,500.00 90.59 333.00 8,076.90 -23,387.15 0.0017,787.76 -16,604.19 0.00 0.00 28,600.00 90.59 333.00 8,075.87 -23,487.15 0.0017,876.85 -16,649.59 0.00 0.00 28,700.00 90.59 333.00 8,074.84 -23,587.14 0.0017,965.95 -16,694.99 0.00 0.00 28,800.00 90.59 333.00 8,073.81 -23,687.14 0.0018,055.04 -16,740.38 0.00 0.00 28,900.00 90.59 333.00 8,072.78 -23,787.13 0.0018,144.14 -16,785.78 0.00 0.00 29,000.00 90.59 333.00 8,071.75 -23,887.13 0.0018,233.23 -16,831.18 0.00 0.00 29,100.00 90.59 333.00 8,070.72 -23,987.12 0.0018,322.33 -16,876.57 0.00 0.00 5/1/2023 11:03:33AM COMPASS 5000.17 Build Page 9 ConocoPhillips Standard Proposal Report Well MT7-94Local Co-ordinate Reference:Database:EDT 17 Alaska Prod Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:Western North SlopeProject: TrueNorth Reference:GMT2 Rendezvous PadSite: Minimum CurvatureSurvey Calculation Method:MT7-94Well: MT7-94Wellbore: MT7-94_wp03Design: Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Vertical Section (usft) Dogleg Rate (°/100usft) +N/-S (usft) Build Rate (°/100usft) Turn Rate (°/100usft) Planned Survey Vertical Depth (usft) 29,200.00 90.59 333.00 8,069.69 -24,087.12 0.0018,411.43 -16,921.97 0.00 0.00 29,300.00 90.59 333.00 8,068.66 -24,187.11 0.0018,500.52 -16,967.37 0.00 0.00 29,400.00 90.59 333.00 8,067.63 -24,287.10 0.0018,589.62 -17,012.77 0.00 0.00 29,500.00 90.59 333.00 8,066.60 -24,387.10 0.0018,678.71 -17,058.16 0.00 0.00 29,600.00 90.59 333.00 8,065.57 -24,487.09 0.0018,767.81 -17,103.56 0.00 0.00 29,700.00 90.59 333.00 8,064.54 -24,587.09 0.0018,856.91 -17,148.96 0.00 0.00 29,800.00 90.59 333.00 8,063.51 -24,687.08 0.0018,946.00 -17,194.35 0.00 0.00 29,900.00 90.59 333.00 8,062.49 -24,787.08 0.0019,035.10 -17,239.75 0.00 0.00 30,000.00 90.59 333.00 8,061.46 -24,887.07 0.0019,124.19 -17,285.15 0.00 0.00 30,100.00 90.59 333.00 8,060.43 -24,987.07 0.0019,213.29 -17,330.54 0.00 0.00 30,200.00 90.59 333.00 8,059.40 -25,087.06 0.0019,302.39 -17,375.94 0.00 0.00 30,300.00 90.59 333.00 8,058.37 -25,187.06 0.0019,391.48 -17,421.34 0.00 0.00 30,400.00 90.59 333.00 8,057.34 -25,287.05 0.0019,480.58 -17,466.73 0.00 0.00 30,500.00 90.59 333.00 8,056.31 -25,387.05 0.0019,569.67 -17,512.13 0.00 0.00 30,600.00 90.59 333.00 8,055.28 -25,487.04 0.0019,658.77 -17,557.53 0.00 0.00 30,700.00 90.59 333.00 8,054.25 -25,587.04 0.0019,747.87 -17,602.92 0.00 0.00 30,800.00 90.59 333.00 8,053.22 -25,687.03 0.0019,836.96 -17,648.32 0.00 0.00 30,900.00 90.59 333.00 8,052.19 -25,787.03 0.0019,926.06 -17,693.72 0.00 0.00 31,000.00 90.59 333.00 8,051.16 -25,887.02 0.0020,015.15 -17,739.11 0.00 0.00 31,100.00 90.59 333.00 8,050.13 -25,987.01 0.0020,104.25 -17,784.51 0.00 0.00 31,200.00 90.59 333.00 8,049.10 -26,087.01 0.0020,193.34 -17,829.91 0.00 0.00 31,253.26 90.59 333.00 8,048.55 -26,140.26 0.0020,240.79 -17,854.08 0.00 0.00 TD at 31253.26 Target Name - hit/miss target - Shape TVD (usft) Northing (usft) Easting (usft) +N/-S (usft) +E/-W (usft) Design Targets LongitudeLatitude Dip Angle (°) Dip Dir. (°) MT7-94 Target 2 1320 8,048.55 5,936,362.46 1,412,885.0220,240.79 -17,854.080.00 0.00 70° 13' 42.105 N 151° 50' 11.992 W - plan hits target center - Circle (radius 1,320.00) MT7-94 Target 1 1320 8,203.01 5,922,814.72 1,419,320.196,876.44 -11,044.600.00 0.00 70° 11' 30.791 N 151° 46' 53.589 W - plan hits target center - Circle (radius 1,320.00) Vertical Depth (usft) Measured Depth (usft) Casing Diameter (in) Hole Diameter (in)Name Casing Points 13-3/8" Surface Casing2,997.904,040.00 13.375 16.000 9-5/8" Intermediate Casing7,326.0413,449.00 9.625 12.250 7" Intermediate Liner8,099.1815,439.00 7.000 8.500 4-1/2" Production Liner8,048.5531,253.26 4.500 6.125 5/1/2023 11:03:33AM COMPASS 5000.17 Build Page 10 ConocoPhillips Standard Proposal Report Well MT7-94Local Co-ordinate Reference:Database:EDT 17 Alaska Prod Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:Western North SlopeProject: TrueNorth Reference:GMT2 Rendezvous PadSite: Minimum CurvatureSurvey Calculation Method:MT7-94Well: MT7-94Wellbore: MT7-94_wp03Design: Measured Depth (usft) Vertical Depth (usft) +E/-W (usft) +N/-S (usft) Local Coordinates Comment Plan Annotations 300.00 300.00 0.00 0.00 Start Build 1.50 500.00 499.91 4.29 -3.00 Start Build 2.00 800.00 798.13 29.96 -20.98 Start DLS 2.50 TFO -29.55 2,986.92 2,513.39 676.52 -1,055.59 Start 10234.27 hold at 2986.92 MD 13,221.19 7,222.07 4,950.26 -9,074.55 Start DLS 1.00 TFO 77.65 13,398.54 7,303.13 5,026.80 -9,212.47 Start 50.00 hold at 13398.54 MD 13,448.54 7,325.83 5,049.08 -9,251.05 Start 902.00 hold at 13448.54 MD 14,350.54 7,735.33 5,450.92 -9,947.07 Start DLS 2.88 TFO 65.68 15,389.30 8,088.70 6,126.69 -10,635.00 Start 50.00 hold at 15389.30 MD 15,439.30 8,099.24 6,167.99 -10,661.14 Start 50.00 hold at 15439.30 MD 15,489.30 8,109.79 6,209.29 -10,687.27 Start DLS 2.80 TFO 50.68 15,701.75 8,147.69 6,390.26 -10,791.72 Start 230.61 hold at 15701.75 MD 15,932.37 8,181.26 6,592.31 -10,897.71 Start DLS 2.80 TFO 4.36 16,253.29 8,203.01 6,876.44 -11,044.60 Start 14999.96 hold at 16253.29 MD 31,253.26 8,048.55 20,240.79 -17,854.08 TD at 31253.26 5/1/2023 11:03:33AM COMPASS 5000.17 Build Page 11 01 May, 2023 Anticollision Summary Report ConocoPhillips Alaska Inc_WNS Western North Slope GMT2 Rendezvous Pad MT7-94 MT7-94 MT7-94_wp03 ConocoPhillips Anticollision Summary Report Well MT7-94Local Co-ordinate Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:Western North SlopeProject: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:GMT2 Rendezvous PadReference Site: TrueNorth Reference:0.00 usftSite Error: Minimum CurvatureSurvey Calculation Method:MT7-94Reference Well: Output errors are at 2.00 sigmaWell Error:0.00 usft Reference Wellbore MT7-94 Database:EDT 17 Alaska Prod Offset DatumReference Design:MT7-94_wp03 Offset TVD Reference: Interpolation Method: Depth Range: Reference Error Model: Scan Method: Error Surface: Filter type: ISCWSA Trav. Cylinder North Combined Pedal Curve NO GLOBAL FILTER: Using user defined selection & filtering criteria MD Interval 25.00usft Unlimited Maximum centre distance of 3,000.00usft MT7-94_wp03 Results Limited by: SigmaWarning Levels Evaluated at:2.79 Added to Error ValuesCasing Method: From (usft) Survey Tool Program DescriptionTool NameSurvey (Wellbore) To (usft) Date 5/1/2023 SDI_Keeper_ADK SDI Keeper All-Attitude Drop Keeper V 1.138.90 1,000.00 MT7-94_wp03 (MT7-94) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi-Station Corre1,000.00 4,040.00 MT7-94_wp03 (MT7-94) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi-Station Corre4,040.00 13,449.00 MT7-94_wp03 (MT7-94) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi-Station Corre13,449.00 15,439.00 MT7-94_wp03 (MT7-94) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi-Station Corre15,439.00 31,253.26 MT7-94_wp03 (MT7-94) Offset Well - Wellbore - Design Reference Measured Depth (usft) Offset Measured Depth (usft) Between Centres (usft) Between Ellipses (usft) Separation Factor Warning Summary Site Name Distance GMT2 Rendezvous Pad CCMT7-01 - MT7-01 - MT7-01 38.90 38.71 120.05 118.83 98.055 ESMT7-01 - MT7-01 - MT7-01 100.09 100.00 120.17 118.74 83.773 SFMT7-01 - MT7-01 - MT7-01 12,036.93 19,645.00 1,826.34 1,683.82 12.814 CCMT7-01 - MT7-01PB1 - MT7-01PB1 38.90 38.71 120.05 118.83 98.055 ESMT7-01 - MT7-01PB1 - MT7-01PB1 100.09 100.00 120.17 118.74 83.773 SFMT7-01 - MT7-01PB1 - MT7-01PB1 997.12 1,000.00 151.04 145.50 27.217 CCMT7-02 - MT7-02 - MT7-02 198.70 200.00 139.72 138.37 103.594 ESMT7-02 - MT7-02 - MT7-02 248.70 250.00 139.77 138.22 89.973 SFMT7-02 - MT7-02 - MT7-02 1,637.34 1,625.00 184.15 175.17 20.513 CCMT7-03 - MT7-03 - MT7-03 38.90 39.90 159.95 158.72 130.640 ESMT7-03 - MT7-03 - MT7-03 173.80 175.00 160.25 158.52 92.521 SFMT7-03 - MT7-03 - MT7-03 12,850.77 21,050.00 1,583.08 1,382.41 7.889 CCMT7-04 - GMT2-SW04 - MT7-04 1,107.83 1,100.00 164.87 158.55 26.057 ESMT7-04 - GMT2-SW04 - MT7-04 1,133.16 1,125.00 164.93 158.52 25.708 SFMT7-04 - GMT2-SW04 - MT7-04 1,549.23 1,550.00 212.48 203.23 22.970 CCMT7-05 - MT7-05 - MT7-05 38.90 39.40 199.99 198.77 163.345 ESMT7-05 - MT7-05 - MT7-05 349.55 350.00 200.82 198.20 76.708 SFMT7-05 - MT7-05 - MT7-05 13,551.37 21,916.00 2,089.06 1,783.14 6.829 CC, ESMT7-06 - MT7-06 - MT7-06 1,138.31 1,125.00 211.47 204.37 29.805 SFMT7-06 - MT7-06 - MT7-06 1,558.86 1,550.00 247.11 237.08 24.640 CC, ESMT7-06 - MT7-06A - MT7-06A 1,138.36 1,125.00 211.47 204.37 29.806 SFMT7-06 - MT7-06A - MT7-06A 1,558.91 1,550.00 247.12 237.09 24.643 CC, ESMT7-06 - MT7-06PB1 - MT7-06PB1 1,138.31 1,125.00 211.47 204.37 29.805 SFMT7-06 - MT7-06PB1 - MT7-06PB1 1,558.86 1,550.00 247.11 237.08 24.639 CCMT7-07 - MT7-07 - MT7-07 38.90 39.40 239.99 238.77 196.016 ESMT7-07 - MT7-07 - MT7-07 99.20 100.00 240.10 238.65 166.354 SFMT7-07 - MT7-07 - MT7-07 1,088.09 1,100.00 299.03 292.32 44.604 CCMT7-08 - MT7-08 - MT7-08 38.90 39.00 260.02 258.80 212.378 ESMT7-08 - MT7-08 - MT7-08 74.70 75.00 260.09 258.75 193.017 SFMT7-08 - MT7-08 - MT7-08 1,913.62 1,900.00 403.00 389.47 29.792 CCMT7-08 - MT7-08PB1 - MT7-08PB1 38.90 39.00 260.02 258.80 212.378 ESMT7-08 - MT7-08PB1 - MT7-08PB1 74.70 75.00 260.09 258.75 193.017 5/1/2023 11:05:52AM COMPASS 5000.17 Build CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 2 ConocoPhillips Anticollision Summary Report Well MT7-94Local Co-ordinate Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:Western North SlopeProject: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:GMT2 Rendezvous PadReference Site: TrueNorth Reference:0.00 usftSite Error: Minimum CurvatureSurvey Calculation Method:MT7-94Reference Well: Output errors are at 2.00 sigmaWell Error:0.00 usft Reference Wellbore MT7-94 Database:EDT 17 Alaska Prod Offset DatumReference Design:MT7-94_wp03 Offset TVD Reference: Offset Well - Wellbore - Design Reference Measured Depth (usft) Offset Measured Depth (usft) Between Centres (usft) Between Ellipses (usft) Separation Factor Warning Summary Site Name Distance GMT2 Rendezvous Pad SFMT7-08 - MT7-08PB1 - MT7-08PB1 1,913.62 1,900.00 403.00 389.47 29.792 CCMT7-09 - MT7-09 - MT7-09 38.90 40.51 280.01 278.79 228.704 ESMT7-09 - MT7-09 - MT7-09 699.89 700.00 281.28 277.12 67.600 SFMT7-09 - MT7-09 - MT7-09 1,117.31 1,125.00 318.85 311.87 45.693 CCMT7-11 - MT7-11 - MT7-11 526.34 525.00 318.27 315.10 100.516 ESMT7-11 - MT7-11 - MT7-11 551.55 550.00 318.31 315.04 97.341 SFMT7-11 - MT7-11 - MT7-11 1,470.99 1,500.00 465.13 457.44 60.453 CCMT7-14 - MT7-14 - MT7-14_wp07 2,302.00 2,250.00 58.91 47.20 5.032 ESMT7-14 - MT7-14 - MT7-14_wp07 2,324.49 2,275.00 59.36 46.47 4.605 SFMT7-14 - MT7-14 - MT7-14_wp07 2,391.19 2,350.00 74.30 55.63 3.980 CCMT7-92 - MT7-92 - MT7-92_wp04 70inc 3.2dls 300.00 300.00 40.06 37.31 14.576 ESMT7-92 - MT7-92 - MT7-92_wp04 70inc 3.2dls 424.81 425.00 40.34 36.87 11.627 SFMT7-92 - MT7-92 - MT7-92_wp04 70inc 3.2dls 623.43 625.00 44.46 39.86 9.662 CCMT7-95 - MT7-95 - MT7-95_wp02 425.03 425.00 19.89 17.01 6.907 ESMT7-95 - MT7-95 - MT7-95_wp02 474.98 475.00 19.96 16.85 6.418 SFMT7-95 - MT7-95 - MT7-95_wp02 624.45 625.00 22.33 18.48 5.799 CCMT7-96 - MT7-96 - MT7-96 38.90 40.34 39.94 38.72 32.624 ESMT7-96 - MT7-96 - MT7-96 123.36 125.00 40.10 38.57 26.195 SFMT7-96 - MT7-96 - MT7-96 498.04 500.00 51.35 48.13 15.942 CCMT7-97 - MT7-97 - MT7-97 299.87 300.00 57.12 54.85 25.091 ESMT7-97 - MT7-97 - MT7-97 324.89 325.00 57.17 54.79 24.038 SFMT7-97 - MT7-97 - MT7-97 1,077.55 1,075.00 73.64 67.40 11.808 CCMT7-98 - MT7-98 - MT7-98 549.63 550.00 76.81 73.50 23.174 ESMT7-98 - MT7-98 - MT7-98 574.54 575.00 76.82 73.40 22.479 SFMT7-98 - MT7-98 - MT7-98 796.54 800.00 84.51 80.10 19.165 CCMT7-99 - MT7-99 - MT7-99 952.37 950.00 91.53 86.32 17.570 ESMT7-99 - MT7-99 - MT7-99 1,002.76 1,000.00 91.69 86.08 16.349 SFMT7-99 - MT7-99 - MT7-99 1,127.60 1,125.00 96.51 90.18 15.258 CC, ES, SFMT7-GCEW1 - MT7-GCEW1 - MT7-GCEW1_wp01 1,834.17 1,850.00 111.28 100.74 10.562 5/1/2023 11:05:52AM COMPASS 5000.17 Build CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 3 ConocoPhillips Anticollision Summary Report Well MT7-94Local Co-ordinate Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:Western North SlopeProject: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:GMT2 Rendezvous PadReference Site: TrueNorth Reference:0.00 usftSite Error: Minimum CurvatureSurvey Calculation Method:MT7-94Reference Well: Output errors are at 2.00 sigmaWell Error:0.00 usft Reference Wellbore MT7-94 Database:EDT 17 Alaska Prod Offset DatumReference Design:MT7-94_wp03 Offset TVD Reference: 0 750 1500 2250 3000 Centre to Centre Separation0 2500 5000 7500 10000 12500 15000 Measured Depth Ladder Plot MT7-92, MT7-92, MT7-92_wp04 70inc 3.2dls V0 MT7-14, MT7-14, MT7-14_wp07 V0 MT7-GCEW1, MT7-GCEW1, MT7-GCEW1_wp01 V0 MT7-08, MT7-08PB1, MT7-08PB1 V0 MT7-08, MT7-08, MT7-08 V0 MT7-07, MT7-07, MT7-07 V0 MT7-02, MT7-02, MT7-02 V0 MT7-09, MT7-09, MT7-09 V0 MT7-04, GMT2-SW04, MT7-04 V0 MT7-03, MT7-03, MT7-03 V 0 MT7-06, MT7-06, MT7-06 V 0 MT7-06, MT7-06A, MT7-06A V0 MT7-06, MT7-06PB1, MT7-06PB1 V0 MT7-95, MT7-95, MT7-95_wp02 V0 MT7-99, MT7-99, MT7-99 V 0 MT7-11, MT7-11, MT7-11 V 0 MT7-01, MT7-01PB1, MT7-01PB1 V0 MT7-01, MT7-01, MT7-01 V0 MT7-98, MT7-98, MT7-98 V0 MT7-96, MT7-96, MT7-96 V0 MT7-05, MT7-05, MT7-05 V0 MT7-97, MT7-97, MT7-97 V0 L E G E N D Coordinates are relative to: MT7-94 Coordinate System is US State Plane 1983, Alaska Zone 4 Grid Convergence at Surface is: -1.59°Central Meridian is 150° 0' 0.000 W Offset Depths are relative to Offset Datum Reference Depths are relative to Plan KB (100.6 GL + 38.9 DF) @ 139 5/1/2023 11:05:52AM COMPASS 5000.17 Build CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 4 ConocoPhillips Anticollision Summary Report Well MT7-94Local Co-ordinate Reference:ConocoPhillips Alaska Inc_WNSCompany: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftTVD Reference:Western North SlopeProject: Plan KB (100.6 GL + 38.9 DF) @ 139.50usftMD Reference:GMT2 Rendezvous PadReference Site: TrueNorth Reference:0.00 usftSite Error: Minimum CurvatureSurvey Calculation Method:MT7-94Reference Well: Output errors are at 2.00 sigmaWell Error:0.00 usft Reference Wellbore MT7-94 Database:EDT 17 Alaska Prod Offset DatumReference Design:MT7-94_wp03 Offset TVD Reference: 0.00 3.00 6.00 9.00 Separation Factor0 2500 5000 7500 10000 12500 Measured Depth Normal Operations Caution Monitor Closely Take Immediate Action STOP Drilling Separation Factor Plot MT7-92, MT7-92, MT7-92_wp04 70inc 3.2dls V0 MT7-14, MT7-14, MT7-14_wp07 V0 MT7-GCEW1, MT7-GCEW1, MT7-GCEW1_wp01 V0 MT7-08, MT7-08P B1, MT7-08PB1 V0 MT7-08, MT7-08, MT7-08 V0 MT7-07, MT7-07, MT7-07 V0 MT7-02, MT7-02, MT7-02 V0 MT7-09, MT7-09, MT7-09 V0 MT7-04, GMT2-SW04, MT7-04 V0 MT7-03, MT7-03, MT7-03 V0 MT7-06, MT7-06, MT7-06 V0 MT7-06, MT7-06A, MT7-06A V0 MT7-06, MT7-06PB1, MT7-06PB1 V0 MT7-95, MT7-95, MT7-95_wp02 V0 MT7-99, MT7-99, MT7-99 V0 MT7-11, MT7-11, MT7-11 V0 MT7-01, MT7-01PB1, MT7-01PB1 V0 MT7-01, MT7-01, MT7-01 V0 MT7-98, MT7-98, MT7-98 V0 MT7-96, MT7-96, MT7-96 V0 MT7-05, MT7-05, MT7-05 V0 MT7-97, MT7-97, MT7-97 V0 L E G E N D Coordinates are relative to: MT7-94 Coordinate System is US State Plane 1983, Alaska Zone 4 Grid Convergence at Surface is: -1.59°Central Meridian is 150° 0' 0.000 W Offset Depths are relative to Offset Datum Reference Depths are relative to Plan KB (100.6 GL + 38.9 DF) @ 139 5/1/2023 11:05:52AM COMPASS 5000.17 Build CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 5 Revised 7/2022 TRANSMITTAL LETTER CHECKLIST WELL NAME:______________________________________ PTD:_____________________________________________ ___ Development ___ Service ___ Exploratory ___ Stratigraphic Test ___ Non-Conventional FIELD:__________________________POOL:____________________________________ Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL (If last two digits in API number are between 60-69) The permit is for a new wellbore segment of existing well Permit Number _____________, API Number 50-______________________. Production from or injection into this wellbore must be reported under the original API Number stated above. Spacing Exception The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce or inject is contingent upon issuance of a conservation order approving a spacing exception. The Operator assumes the liability of any protest to the spacing exception that may occur. Dry Ditch Sample All dry ditch sample sets submitted to the AOGCC must be in nogreater than 30-foot sample intervals from below the permafrost or from where samples are first caught and 10-foot sample intervals through target zones. Non- Conventional Well Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for this well until after the Operator has designed and implemented a water-well testing program to provide baseline data on water quality and quantity. The Operator must contact the AOGCC to obtain advance approval of such a water-well testing program. Well Logging Requirements Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by the Operator in the attached application, the following well logs are also required for this well: Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for all well logs run must be submitted to the AOGCC within 90 days after completion, suspension, or abandonment of this well, or within 90 days of acquisition of the data, whichever occurs first. GMTU MT7-94 223-049 X Rendezvous Oil X Greater Mooses Tooth X WELL PERMIT CHECKLIST Company ConocoPhillips Alaska, Inc. Well Name:GMTU MT7-94 Initial Class/Type SER / WAGIN GeoArea 890 Unit 10750 On/Off Shore On Program SERField & Pool Well bore seg Annular DisposalPTD#:2230490 GRTR MOOSES TOOTH, RENDEZV OIL - 2822 NA1 Permit fee attached Yes Surface Location lies within AA0081800; Top Productive Interval lies in AA0081803; TD lies in AA0081805.2 Lease number appropriate Yes3 Unique well name and number Yes GRTR MOOSES TOOTH, RENDEZV OIL - 282200, governed by CO 7934 Well located in a defined pool Yes5 Well located proper distance from drilling unit boundary Yes6 Well located proper distance from other wells Yes7 Sufficient acreage available in drilling unit Yes8 If deviated, is wellbore plat included Yes9 Operator only affected party Yes10 Operator has appropriate bond in force Yes11 Permit can be issued without conservation order Yes12 Permit can be issued without administrative approval Yes13 Can permit be approved before 15-day wait Yes Area Injection Order No. 43, issued July 13, 2021, governs Rendezvous Oil Pool14 Well located within area and strata authorized by Injection Order # (put IO# in comments) (For s Yes Currently there are no other wells within 1/4 mile of MT7-9415 All wells within 1/4 mile area of review identified (For service well only) No Well will not be pre-produced other than flowback to clean up the well prior to injection. See email 6/3016 Pre-produced injector: duration of pre-production less than 3 months (For service well only) NA17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D) Yes 80'18 Conductor string provided Yes 4040' MD19 Surface casing protects all known USDWs Yes 72% Excess20 CMT vol adequate to circulate on conductor & surf csg No21 CMT vol adequate to tie-in long string to surf csg No22 CMT will cover all known productive horizons Yes23 Casing designs adequate for C, T, B & permafrost Yes24 Adequate tankage or reserve pit NA25 If a re-drill, has a 10-403 for abandonment been approved Yes anti-collision complete; no major risk failures26 Adequate wellbore separation proposed Yes variance granted per 20 AAC 25.035(h)(2)27 If diverter required, does it meet regulations Yes Max reservoir pressure 3641 psig(8.7 ppg EMW); will drill w/ 8.8-13.5 ppg EMW28 Drilling fluid program schematic & equip list adequate Yes29 BOPEs, do they meet regulation Yes MPSP is 2836 psig; will test BOPs to 5000 psig initial; 3500 psig subsequent30 BOPE press rating appropriate; test to (put psig in comments) Yes31 Choke manifold complies w/API RP-53 (May 84) Yes32 Work will occur without operation shutdown No33 Is presence of H2S gas probable Yes no wells in 1/4 mile radious34 Mechanical condition of wells within AOR verified (For service well only) Yes None expected. Rig has sensors and alarms.35 Permit can be issued w/o hydrogen sulfide measures Yes Expected Pressure Range is 8.3 to 11.8 EMW. Operator's planned mud program with MPD appears36 Data presented on potential overpressure zones NA sufficient to control anticipated pressures and maintain wellbore stability.37 Seismic analysis of shallow gas zones NA Tusk sand potential in Int1, will require a second stage cement job if encountered.38 Seabed condition survey (if off-shore) NA High risk of hole instability in Int2 secion, see page 16. MPD will be utilized.39 Contact name/phone for weekly progress reports [exploratory only] Appr MDG Date 7/3/2023 Appr VTL Date 7/4/2023 Appr MDG Date 7/3/2023 Administratio Engineering Geology Geologic Commissioner:Date:Engineering Commissioner:Date Public Commissioner Date GCW 07/05/2023