Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
185-188
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, September 15, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Austin McLeod P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. 3C-02 KUPARUK RIV UNIT 3C-02 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 09/15/2025 3C-02 50-029-21414-00-00 185-188-0 W SPT 6089 1851880 1522 2250 2250 2250 2250 250 340 340 340 4YRTST P Austin McLeod 8/2/2025 MITIA 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:KUPARUK RIV UNIT 3C-02 Inspection Date: Tubing OA Packer Depth 645 1760 1710 1700IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSAM250803180543 BBL Pumped:1 BBL Returned:1 Monday, September 15, 2025 Page 1 of 1 9 9 9 9 9 9 9 999 99 9 9 9 9 James B. Regg Digitally signed by James B. Regg Date: 2025.09.15 12:00:34 -08'00' MEMORANDUM To: Jim Regg t P.I. Supervisor FROM: Brian Bixby Petroleum Inspector NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, August 25, 2021 SUBJECT: Mechanical Integrity Tests ConocoPhillips Alaska, Inc. 3C-02 KUPARUK RIV UNIT 3C-02 Src: Inspector Reviewed By: P.I. Supry Comm Well Name KUPARUK RIV UNIT 3C-02 API Well Number 50-029-21414-00-00 Inspector Name: Brian Bixby Permit Number: 185-188-0 Inspection Date: 8/21/2021 ✓ Insp Num: mitBDB210821164124 Rel Insp Num: Packer Depth Well 3C-02 Type Inj w TVD 6089 PTD ----- 1851880 'Type ----- - -- Test, -- 'Test si sPT•i p ',I lszz BBL Pumped' BBL Returned: 1 I Interval _1.l - -- 4YRTST - P Notes: 340 340 Pretest Initial 15 Min 30 Min 45 Min 60 Min Tubing 2750 2750 2750 2750 IA 590 --- 2010 — — 1960 1955 '^ - -4: OA 230 340 340 340 Wednesday, August 25, 2021 Page I of I i S MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: DATE: Thursday,August 10,2017 Jim Regg P.I.Supervisor c' 6(Z-tit 7 SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA,INC. 3C-02 FROM: Chuck Scheve KUPARUK RIV UNIT 3C-02 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry :r' NON-CONFIDENTIAL Comm Well Name KUPARUK RIV UNIT 3C-02 API Well Number 50-029-21414-00-00 Inspector Name: Chuck Scheve Permit Number: 185-188-0 Inspection Date: 8/3/2017 Insp Num: mitCS170806083429 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 3C-02 ' Type Inj W 'TVD 6089 Tubing 2910 - 2910 - 2910- 2910 PTD 1851880 Type Test SPT Test psi 1522 . IA 970 2000 1950 " 1950 BBL Pumped: I ' BBL Returned: 0.9 OA 440 520 520- 520 Interval 4YRTST P/F P Notes: SCANNED -r ' Thursday,August 10,2017 Page 1 of 1 WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. Attn.: Christine Mahnken 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Perforating Record: 3C-02 Run Date: 8/11/2009 November 20, 2009 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rafael Barreto, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 3C-02 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50-029-21414-00 PLEASE ACKNOWLEDGE RECEII'T BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Rafael Barreto 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-273-3527 Fax: 907-273-3535 rafael.barreto@halliburton.com Date: U~ ~ 1 ~5 -- / '~ ~S /``~ ~ i ,~~ ~~_ ~, Signed: MEMORANDUM TO: Jim Regg ~ ~ ~ <<~30~0 ~ P.I. Supervisor rq FROM: LG ~G!-~'~.cc~, ) Petroleum Inspector State of Alaska • Alaska Oil and Gas Conservation Commission DATE: Friday, November 06, 2009 SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC 3C-02 KUPARUK RIV UNIT 3C-02 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv ~>~ Comm Well Name: KUPARUK RIV UNIT 3C-02 API Well Number: 50-029-21414-00-00 Inspector Name: LG Insp Num: mitLG091105193439 Permit Number: 185-188-0 Inspection Date: 11/3/2009 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. - - T 3C-02 ~ Z Well I}- Type Ind. `~' TVD P.T.D l asiaso '~ - ~T -~- i TypeTest !'PT ~ Test psi --1-------I--- ~-L- - T ~ ( / l- ~----,,~- ~ 6os9 IA ~ sso I 2I3o ~ 2oso i zoo i - ------~----t - - ---~ ------- -' {-- Is22 '~, OA ' tao ~ lao ~ tao ~ Iao ~ ~ -~----~-- - ~-- Interval aYRTST p~F P Tubing z6so_ 1- z6so ~ z6so iL 26so Notes: 1.3 Bbl's pumped. Good solid 4 year test. Friday, November 06, 2009 Page l of 1 • STATE OF ALASKA ~~~~~~~~ • aC~ 2 ~ ~009 ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIOI~s~~~wi~Gas~oas.Comrnis~i~on 1. Operations Performed: Abandon ^ Repair Well ^ Plug Perforations ~ Stimul8te ^ Other Alter Casing ^ Pull Tubing ^ Pertorate New Pool ~ Waiver ^ Time Extension ^ Change Approved Program ^ Operat. Shutdown^ Perforate ~ Re-enter spended Well ^ 2. Operator Name: COnOCOPhillips Alaska, InC. 4. Well Class Before Work: Development ^ Exploratory ^ Permit to Drill Number: 185-188 / 3. Address: Strati ra hic g p ^ Service ~ 6. API Number: P. O. Box 100360, Anchora e, Alaska 99510 50-029-21414-00 KB Elevation (ft): . Well Name and Number: RKB 84' , 3C-02 . Property Designation: 0. Field/Pool(s): ADL 25634 Kuparuk River Field / Kuparuk River Oil Pool 11. Present Well Condition Summary: ~ Total Depth measured .. 7635' feet ~ true vertical 6669' feet Plugs (measured) Effective Depth measured 7514' feet Junk (measured) whipstock @ 7062' true vertical 6577' feet Casing Length Size MD ND Burst Collapse Structural CONDUCTOR 80' 16" 110' 110' SURFACE 3861' 9-5/8" 3861' 3735' ~} PRODUCTION 7635' 7" 7635' 6669' Perforation depth: Measured depth: 7168'-7172', 7176'-7212', 7231'-7250' ~~ Ai~~ f~~;'~y ~~ 13 2Ua~ f;7 true vertical depth: 6316'-6319', 6322'-6350', 6365'-6379' Tubing (size, grade, and measured depth) 3.5", L-80, 7114' MD. PaCkefs & SSSV (type 8~ measu~ed depth) Baker S-3 production pkr, Baker F-1 production pkr, seal bore extension @ 6876', 7090', 7093' TRMAXX-SE SSSV @ 2018' 12. Stimulation or cement squeeze summary: Intervals treated (measured) refer to attachment Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation SI -- Subsequent to operation SI -- 14. Attachments . Well Class after work: Copies of Logs and Surveys run _ Exploratory ^ Development ^ Service ~ Daily Report of Well Operations _X . Well Status after work: PLUGGED ^ Oil^ Gas ^ WAG ^ GINJ ^ WINJ ^~ WDSPL ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 309-247 Contact Jill Long @ 263-4093 Printed Name ~' g r ~ Title Wells Engineer / ~ Signature r ~ Phone: 263-4093 Date J~ 2,~~ ~~ ~ Pre ared b Sharon All -Drake 263-4612 V Form 10-404 Revised 04/2006 ~ ~~~s ~'~l~l~ ~ "- ~~j~ZC'"d~ Submit Ori~al Only 3C-02 Well Events Summary 6ATE - SUMMARY 6/20/09 PULLED 1" SOV AND SET DM 6752' RKB. PULLED 2.81" RHC PLUG ~939' RKB. MITT & MITIA TO 2500#, PASSED. ATTEMPT TO SHEAR SOS, UNSUCCESSFULL. IN PROGRESS. 6/21/09 SHEARED SOS @ 7113' RKB. TAG SAND PLUG @ 7116' SLM. JOB COMPLETE. 6/28/09 PERFORM SAND PLUG CLEANOUT TO 7315 CTMD, USED SLB JET NOZZLE TO GET THROUGH LAST 100 FT OF EXTREMELY HARD SAND, APPROX 80' RATHOLE, WELL IS FREEZE PROTECTED. 7/6/09 DRIFT 2.73" FOR POSSIBLE BRIDGE PLUG. TAGGED @ 7292' SLM. OBTAINED SAMPLE. IN PROGRESS. 7/7/09 DRIFT 2.5" x 10' TO 7100' SLM. PEFORMED 30 min SBHPS @ 7134' RKB=3954 psi, 105 deg F. 15 min GRADIENT STOP MADE @ 7005' RK6=3910 PSI. JOB COMPLETE 8/1/09 DRIFT TBG W/ 2.7" & TAGGED @ 7279' SLM, NO SAMPLE OBTAINED, JOB COMPLETE. 8/3/09 MEASURE SBHP @ 7209' ELMD: 3873 PSI; 104 DEG F& 7050' ELM: 3817 PSI, 108 DEG F. SET HALLIBURTON 3.5" FASDRILL BRIDGE PLUG (2.69" OD) @ 7107' RKB. PLUG TESTED GOOD TO 2500 PSI, IN PROGRESS. 8/4/09 COMPLETED PERFORATING ZONES 7072' - 7077', AND 7080' - 7085. UNABLE TO ESTABLISH ANY FLOW RATE WHILE LITTLE RED PUMPED DOWN TUBING. 8/7/09 COMPLETED PERFORATING ZONES 6995-7005', 7025' - 7035', AND 7055' - 7065. ATTEMPTED TO ESTABLISH A FLOW RATE WHILE LITTLE RED PUMPED DOWN TUBING ON ALL THREE INTERVALS WITH NO SUCCESS. 8/11/09 COMPLETED PERFORATING ZONES 6990-6995', 7065-7070' WITH 2" MILLENIUM 6 SPF 60 DEG DP CHARGE GUNS. ATTEMPTED TO ESTABLISH A FLOW RATE WHILE LITTLE RED PUMPED DOWN TUBING ON BOTH INTERVALS WITH NO SUCCESS. 8/12/09 SURGED WELL MULTIPLE TIMES TO 3500# BEFORE FINALLY ABLE TO COMMUNICATE WITH FORMATION. WELL FLOWS ~0.5 - 0.75 BPM AND ABLE TO INJE T 2 BP . 8/14/09 VERIFIED FAST DRILL PLUG @ 7107' RKB. WITH HOLEFINDER UNABLE TO TEST BELOW ANY PERFS f/ 6990' - 7085' MD, INDICATING AT LEAST SOME CONDUCTIVITY THRU UPPERMOST PERFS. INJECTED 160 BBL SW @ 3000 PSI, 2 BPM. READY FOR E/L. 8/15/09 (PRE CTD) T POT - PASSED. T PPPOT - PASSED. IC POT - PASSED. IC PPPOT - PASSED. 8/16/09 PT & DD TEST PRE-CTD; MV- PASSED; SSV- PASSED; SV- PASSED; SSSV- PASSED (PRE-CTD) ~ 8/21/09 FLAGGED PIPE WITH SLB MEMORY LOG, RAN BAKER 2.13 INFLATABLE PACKER ON SECOND RUN, COULD NOT GET PACKER TO SET AFTER PUMPING 2 BALLS, RTN IN A.M. WITH NEW TOOLS. 8/22/09 SET BAKER 2.13 INFLATABLE PACKER @ 7041 RKB, INJECTED S/W 2.0 BPM @ 2800 f'~ ~ WHP, GOOD COMMUNICATION ACROSS PERF INTERVAL. RTN IN A.M. FOR CEMENT • JOB. 8/23/09 PUMPED 15 BBLS OF 15.8 PPG CLASS G CEMENT FROM PLUG DEPTH OF 7107 RKB `~P TO TARGET TOC @ 6950 RKB, SQUEEZED 5 BBLS BEHIND PIPE, PUMPED REMAINDER OF CEMENT IN TUBING, PUH TO SAFETY, WAITED 30 MIN, JETTED TUBING TO TOC @ 6950 USING BIOZAN & SM/, WELL IS FREEZE PROTECTED WITH 1250 WHP TRAPPED. 8/26/09 MILLOUT CEMENT& 3.5 FAS DRILL PLUG FROM 6990 CTMD TO 7017 CTMD WITH 3.0 BI-CENTER MILL. PUSHED PLUG TO 7250 CTMD, WELL IS FREEZE PROTECTED & READY FOR E-LINE. 8/28/09 WORKED 2.73" GAUGE RING THROUGH C SAND STRADDLE TO TAG @ 7270' SLM. RAN PDS CALIPER FROM 7150' SLM TO 6250' SLM. DATA EMAILED TO HOUSTON. MEASURED BOTTOM HOLE PRESSURE 7200' RKB (3774 PSI, 103 DEGF), GRAD STOP AT 7000' RKB (3704 PSI). IN PROGRESS 8/29/09 DRIFTED TO 7150' SLM WITH SIMULATED WHIPSTOCK. .DUE TO CALIPER DATA, IT WAS DETERMINED COIL WILL NEED TO UNDERREAM TARGET DEPTH OF 7060' RKB WHIPSTOCK AREA 3C-02 Well Events Summary '8/30/09 PERFORMED CEMENT MILL WITH 2.375 REEVES UNDER-REAME H 2.934 BLADES. CLEANED TUBING~LS FROM 6950 CTMD TO 7100 CTMD~ SEVERAL PASSES, HEAVY CEMENT IN RTNS, TUBING WALLS APPEAR TO BE VERY CLEAN, WELL IS FREEZE PROTECTED & READY FOR E-LINE. 8/31/09 ATTEMPTED TO SET BAKER 3-1/2" MONOBORE WHIPSTOCK AT 7060'. CORRELATED DEPTH TO SCHLUMBERGER CBL LOG DATED 30-SEP-1985. HAD DIFFICULTY ACHIEVING 0 DEG ORIENTATION AT STOP DEPTH. MADE NUMEROUS ATTEMPTS TO ORIENT WHILE PULLING INTO PLACE. ATTEMPTED TO SET AT 7060' (TOP OF WHIPSTOCK) AND 8.3 DEG RIGHT OF HIGH SIDE. SAFE FIRING SYSTEM FAILED TO FIRE. PULLED OUT OF HOLE WITH WHIPSTOCK. 9/1/09 BRUSH & FLUSHED TBG TO 7288' RKB, RAN 14'x 2.74" DUMMY PATCH TO 7288' RKB, NO TIGHT SPOTS, RAN CALIPER F/ 7150' SLM TO 4900' SLM, READY FOR E-LINE. 9/4/09 SET BAKER MONOBORE 2-5/8" X 3-1/2" RWS WHIPSTOCK TOP AT 7062'. ORIENTED 5 DEG LEFT OF HIGH SIDE. 2 RA PIP TAGS AT 7067'. (WHIPSTOCK DIAGRAM ATTACHED IN WELLVIEV~ ~ ~ WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. Attn.: Christine Mahnken 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Perforating Record: 3C-02 Run Date: 8/7/2009 September 8, 2009 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rafael Barreto, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 3C-02 Digital Data in LAS format, Digital Log Image file ~ 1 CD Rom 50-029-21414-00 , i }.. wra .. .. .y'~J i. .. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Rafael Barreto 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-273-3527 Fax: 907-273-3535 rafael. b arreto @hall iburton. com Date: ~ ~ - ~ - ~ ' ~ U~~ ~~~ - ~~~ I~(o~~ f /( ~ ~ l ~l Signed: ~_ ~ ~,~~ .~ -- ~,~ P~toAcrivE DinyNOSric SeevicES, Inc_ ! ~ ~~~,~ ~o~ 1"RANSMfTT'~4~ To: A~GCC Christine Mahnken 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 (907) 659-5102 RE : Cased Hole/Open Hole/Mechanical Logs and/orTubing Inspection(Caliper/ MTn The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following : ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907~ 245-g952 9 j Caliper Report 2] Signed : Print Name: 01 ~Sep-09 3C-02 v~ ~ . ~; ~:~'~' ~~.~> .. ,_.;~~.t ' ?I'i 1 Report / EDE 50-029-21414-00 i~~-rS~ 1 ~S ~~ Date PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 95518 PHONE: (907)245-8951 Fax: (907)245-88952 E-MAIL : - - - WEBSITE C-~Documen6 and Settings\OamerlDesktop\Transmit_Conow.docx • • Memory 11~Iulti-Finger ~liper ~ , Log Resulfi.~ 5ummary Company; ConocoPhillips Alaska, Inc. Well: 3C-02 Log Date: September 1, 2009 Field: Kupa~uk Log No. : 7364 State: Alaska Run No.: 2 API No.: 50-029-29414-00 Pipe1 desc.: 3.5" 9.31b. L-80 EUE 8rd Top Log intvl: 6,820 Ft. (MD) Pipe1 Use: Tubing Bot. Log Intvi: 7,120 Ft. (MD) Inspection Type : Corrosive 8 Mechanical Damage Inspection COMMENTS : This caliper data is tied into the top of fhe shear ouf sub @ 7,113' (Driller's Depth). This log was run to evaluate the performance of the bi-center bit used during the CTU cement cleanout and ta idenfify any diameters sma(ler than the acceptabfe minimum setting iD of 2.875". The caliper recorciings indicate twa main intervals of significant deposits (7,056' to 7,067'; 7,075' to 7,078'). A 3-p log plot of the caliper recordings across the interval logged, including the proposed whipstock ptacement interva! (7,060'), is included in this report. Field Engineer; Wm. McCrossan Analyst: C. Waldrop Witness: B.Boehme ProActive +Jiagncstic Services, Inc. / P.O. Box 1369, Staffard, TX 77497 Phone: (281) or (888} 565-9085 Fax: {281} 565-1369 E-mail: PDS~tiamemorylog.com Prudhoe Bay Fieid Office Phone: (9Q7) 659-Z307 Fax; (90?) 659-2314 U~ 1~5~ =~~~ ~~5~ • • PDS Multifinger Caliper 3D Log Plot ~. .~ Company : ConocoPhillips Alaska, Inc. Field : Kuparuk Well : 3C-02 Date : September 1, 2009 Description : Detail of Caliper Recordings Across Proposed Whipstock Placement /nterval (7,060) Comments Depth Max I.D. (1/1000 in.) 1ft:120ft 2~ ~~ Min I.D. (1/1000 in.) 2500 3500 Nominal I.D. :.. ................................................... ............~ 2500 3500 Whipstock Setting Min ID (2.875") :. ..................................,.................. . 2500 3500 3.5" Tubing X Nipple 6830 Pup Jt. I 6840 Seal Assembly PBR 6850 Pup Jt. 6860 Pup Jt 6870 S3 Packer 6880 6890 3-0 Log Image Map 137° 0° 90° 180° 270° 0° • i . ~ 3.5" Tubing I 7000 7070 7020 I 7030 3.5" Tubing 7040 7050 7060 3.5" Tubing 7070 7080 T ~ _~ ,.~: "'"' a _ _ . "=a~+1t ~ - .~,.r; ~r;- ... i ___.~: ~._y ~ ~ r-----.. _ ~~ _ :.~ ~~ ~ ~- ~ >~~ _ ~ ~~ . ~ 1 b ... 1.... ~ ~ ... .. .._'~~. ~~ 3.5" Tubing 7090 • • ,,,~,: . ,~,. - _ . .. . . , ; ~.., _. , ,:~. ~. . ~ ~.; ~... 7100 ~'~ sea~ A mbl ~ " sse y .~ ~. Pup Jt 7110 - - ~, , --- - _-- --_--- sos ~~~ . Production Casing Whipstock Setting Min ID (2.875") :.................................................................... 2500 3500 Nominal I.D. ~ .. ...............................................................{ 2500 3500 Min I.D. (1/1000 in.) 2500 3500 Comments Depth Max I.D. (1/1000 in.) 3A Log Ima e Map 1ft:120ft 2500 3500 137° 0° 90° 180° 270° 0° ~~ ConocoPhiilips ~I.i1~.i. ~... w.x --~diensro -Ti~~i HrwcFa, ai cowoucroR. ~-t io e 95N, 2pi6 SURFACE, j 36 3,881 c,~ urr. e ~Tt NIPPI~ 6,et9 S6YM.SY, BgJ7~ PBR. B.tl38 _ - _ - PACKER. 6878 MPPI~ Bp90 RPBtF, 6A&5-~D03 raetF. 7A~5.IA35 7p55-7p05 RPHiF, 7A~-7A70 iP9tF. 7A72-7D~7 SBE iD9~ PLUO. 7,107 505. 7,113 IPHiF, 7.16&7.1tt IPHtF. ~.,n-~2~z PLUG. 7.76D IPH2F. 7$37-7250 ooucnoH. 32-7.606 ~ ~ 7O,7A35 KUP ~ 3c-o2 elt Attrlbu~es ax An le 6 MD TD ' `.~ WullboraAPllUWI 500292141400_ FqdNama KUPARUKRNERUNIT ___ ___ Wdl9tnluc ~~iitlncl~'J MO(kNBj E~IIf INJ _ ~ 4280 ___4,ODD.00 ~m~K E~~it 7,635.D ~ Commer4 E~Itt H25(ppml Oate SSSV -TRDP 0 " E~II t ~~~I~ ~~e Eillt K&G ~1t1 Po9 ~le Edit . Mu~chmon LastTa SLM 1f1f 1U09 LastWO: 6f13R009 36.59 Dapth(RK61 Entl D E~~It ~~~ion La4 Mod By 7,279A B/i12D03 ~ PevReason: PERF Imosbor 9117l198 Fid Date E~IIt 811'J2009 Casing SMngs c,~.~c~,~~~o~ StrirpO.. 8trirpl0 . Top(fiKBJ s~oev+hn.. sKn~m[~1[. s~ri~ev~.. s~~~„~.. s~~~er~ F,li~ CONDUCTOR 16 15.062 J5.0 110.0 710.0 62.5G H-40 tas~ng ~eription 3URFACE String O. . 9 5!8 9trirp ID ... BJ65 op (1lKB) 35.3 9d Oepth (1.. 3 861 4 Se1 DeptA (NDj( . 3 734 B . 9lrirgNt.. 36.G0 SYrirg . J-55 9h~ng Top E illl BTC cas~nqo~-.::~a~o~, PRODVC~7GN ~r;~o. 7 s~~~y~o. 8.151 ~xinKe, 3i.6 s~oevm~.- 7,6G6.3 setoeRnmoii- 8,6480 .str~~wt.. 26,00 s~r~~y.. J-55 ~~~naTw F~Ih BTC ___ Tubin Strin s ~- g--- -- n,a~o~.~Pno~ sm~o eM~qio... ocMrcel s~u~n,n... s~o~a~(T~ull...sm~qva... s~.~„q... s~.,~,yT,a E~lit NBINO 3112 ~ 2.8ffi 30.fi 0,849.1 FiAfi7.E 9.30 ~L-80 EUE 8rJ Com letion Dealls i si, ro ke r~, o,~n ; irarq ! r~v i~i I~ne~ Pl kamoooc.~ ~ ~ mmwn io ~~~ 30.6 ~.6 0.40 HANOER ~'x31J2'TBOHa~pxwl3'TypeHBPVProfile 3.030 201 F.6 Z017.5 0.66 SS31~' 3.5"x 2.87 3"X' Profile TRMPJIX-5E Saley Valve 2.B13 6,829.1 6,051.fi 37.41 NIFFLE 2.013'XNlpde 2.813 6,836.6 8,057.8 37.4d SE<+LASSY Locatorand80-405ealAs:embywl2spaceoW 2.992 ~bingDescriptior~ :kri~0... TUBIN['i 3111 ELEC 9trinpt0... 29AT bp(RNB) S R.A3R1 MO~PtnP... 7.!?9ftF eetDePM(TNOI(... R,2fl12 9lrinpNt... 930 91ri^0... I.-fip 91rinBoP .~ii EUERM Completlon Details :, 1no, ~ ~----_ . . _. . . .. _ .. . _.._. _ . ._.._ ---. ._ .. . _. _. - - _. _------ - T p o~en Tcp In~l To NB InKdl (°~ kem0esorl 1 Comrneid ID ir ~ 6.9381 6.05R R 37 d9 PPA Polish Rore Receptade 3 f100 8.865.6 6,080.8 37.)1 XO-Enlarging 31J2EUE8~d6oKxA1f218TPin 2,g90 8.875.9 6.D88.9 37.80 PAqCER Baker "S-3" Production Packer 3.875 8.890.8 8,10(1.7 37.92 XO - Reducinq 411218T Box x 3 112 EUE 9~d Pin Goss over sub 3.01 ~ 6,939.7 6,139.1 39.3] Nlf'F'LE HES 2.813"MJ Nipple i.i 2.75' NO GO 2750 7,088.5 6.254.9 39.51 SEPLlv;~Y 'OBI-F22"80-0OSeelAasembly&Locator(2'sveceou~ 3.000 iw~.~p n~~~o+~M, np o errir~ in op~nKe~ see o~m~+ ~~ str~.~p qr~r+a _ ser~~tl T~o ,r TU61NG AIL 37l2 2.992 709p.0 711d.0 6274.5 9.30 L80 EUESR CompleHon Detalla T NB too oepth (N~) I T MKB) ''. ~y X~CI _ (°_`_.._ kem0encription _'_____ Commerd I~in 7,090.0 6,258.1 - 39.52 - -- PApCER - BakerF-t RndudionPacker -_ -- ------ - - - -~ 4.D00 7.093.3 6.258.6 39.55 36E ----_ - 8ed Bme F~ctansion 4.000 7,086.2 6,262.-0 39.$9 XO-Reducinq L.crer~'Guide 2.970 7.173.0 6,273.8 39.70 505 SHEAR OUT 5U8 3.1d0 Oth~r In Hol~ (Wir~Nm rN-i~vabl~ plugs. vatws. pumps. fish. ~te.l- -- --T -. f~++~ __ _-- - TaP Clz~1h . .. [P/D~ T~p Ir~cl T k6 InK6~ l~l ~lesrci ' Ccmrc~erM fMGde ID in ~ 7,107 Q269.2 38.68 PLUG 3.6'FASOFILLBAIDGEPLVG(OAL~22.80') 813f2009 0.000 7,150 8.302.1 40.00 PLUG 8AND PLUG COVERINO A-SANDS 57&2009 U.Q00 Pertorations 8 Slots ~ '~'~ T ttNB Btm NB rop rNn) (ttKB~ m~r, (Nn) InH;AI I I Oate snet Oenc ~~~~ i e Lommert fi.990 6.995 8,178.5 6,182 4 G~, VNIT 8. 3C-02 8lI1l2009 6.0 RPERF 2" Millenium, bP charges, 60 deg phasing 6,991 7,0~5 6,179.3 6,189.8 C~1,UN(i6, 3G02 10fi6119... 12.0 ~PERF 5'HJNCagQun,120deg.phating fi995 x_nn!s ft,7R?d R,1R9A f I,UNRP, 3G02 RAf7009 Rtl RPERF 2"HMXBHrhalrgea.hMr. diamsqr.dB" 7,025 7,U3S 6,205.5 8,213.i UNRB.3G02 SAR009 6.0 APERF 2'HM7C8Hcharges,AOle diameter 48' Z055 l,Uti5 6.228.9 6Z38] UMTB.3G02 8Rf2009 6.0 APERF 2'HMXBHcharpes,hole diameter~ 48` P,065 7,07U 6,236.7 8,7A0.6 8-3. 3GU2 Bf71R009 RpERF 2'Millenium, DP eharges, 80 deg phasing 7,072 7.07? 6,242.1 6,246.0 &3,3G02 8/412009 6.O IPERF 2"HMXBHOUNS 7.080 7,OB5 6,248.3 6,252.2 B-3, 3G02 SWf2009 fi.0 IPERf Z" HMX BH GUNS 7.7fi8 7.1 ?2 8,315.9 6,319.0 A-4, 3G02 1Of15119... 4.0 IPERF 4 " HJ II Csg ~un, 80 deg, phasinq 7.17C Z212 6,322.1 8.350.3 A-3. 3G02 10715t19... 4.0 IPERF 4 'IiJ II Csp Dun. 90 deg. phasiny 7.231 7.250 8.36A.5 8.378.8 1r2 3C-02 tOfl5ft 9... 4.0 IPEiiF 4 " HJ 11 Cso Gun. 90 deo. Phasinp Noter. C3~neral & Saf.ry r m Eraf O~e fuxwtaliun 6I181Z009 NOTE: VIEW SCHEM471CwINaskn Schema6q.0 Mandrel Dstadls t ~i~~ 5Y1 I ttrcB r~ o~pt ~rvo] (hHel n 'rop ~~~ l'1 ke Moae~ oo pn) saY v,w: ~ T ~~~n type ron s=e l~~~) rao n~~ fcsll H~m Ua~e t:om... 1 6,752.4 5,991. 8 38.... CAM... KBMG 1 QA$ L1FT OMY 6K 0.0... U.U 812012009 ~~ ~~~' ~;,..._.,.-_ ~ ~~ : PaoAcrive Dinynos~ic Sertvic.~s, INC. • • VY '~L.L L~V TI~?A/I ~S~/1/T 7",4L To: AOC~C Christine Mahnken 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 (907) 659-5102 RE : Cased Hole/Open Hole/Mechanical Logs and/arTubing Inspection(Caliper/ MTTj The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following : BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastuflca LR2-1 900 Bensan Bhrd. Anchorage, Alaska 99508 (~ ~r C ~~s s = t~s~s and ~ / ~'S S foc~ ProActive Diagnostic Services, lnc. Attn: Robert A. Richey 130 West International Airport Road '=, f`~~r=, Suite C _.,: ~ ..~. _ . Anchorage, AK 99518 Fau: (907) 245-8952 1 ] Caliper Rpn~-~ 2~ Signed : Print Name: ~~i-~~in.tl~l '~f:-(1'.~ PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT R~ SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 Fax: (907)245-88952 E-MAIL : : ~ ri= ?i'.! - _ WEBSITE ._ ~ `:__ C ~Documents and Settings\Owner~Desktop\Transmit_BP.doc~ ~ • Memory Mul~i•~'inger Galip~r ~ , Log Resu~~Cs Summary Company: ConocoPhiilips Alaska, Inc. Wetl: 3C-0Z Log Date: August 28, 2009 Field: Kuparuk Log No. : 7350 State: Alaska Run No.: 1 AP! No.: 50-029-21414-00 Pipe1 Desc.: 3.5° 9.3 ib. L-80 EUE 8rd Top Log intvl: 6,800 Ft. (MD) Pipe1 Use: Tubing Bot. Log intvl: 7,120 ~t. {MD) Inspection Type : Corrosive & Mechanical Damage lnspection COMMENTS : This caliper data is tieaf into the top of the shear out sub @ 7,113' (Drilier's Depth). This log was run to evaluate the performance of the bi-center bit used during the CTU cement cleanout and to identify any diameters smaller than the acceptable minimum setting ID of 2.875". The caliper recordings indica#e two main intervafs of significant deposits (7,004' to 7,018'; 7,028' to 7,081'). A 3-D log plot of the caliper rec:ordings across the interval -ogged, including the proposed whipstock placement interval (7,060'), is included in this report. ~ield Engineer: Wm. McCrossan Analyst: M. Lawrence Witness: B_Boehme ProRctivve Diagnostic Services, Inc. / P.O. Box 1369, Stafford, TX 77497 Phone: (231) or (888) 5b5-9Q85 Fax: (281) 565-1369 E-mail: PDS@memorylog.com Prudhoe Bay Fiefd Office Phone: {90?) 659-2307 Fax: {907} 659-2314 Vi~ ~~~~~ ~ ~~ ~U a- ' • • ~ PDS Multifinger Caliper 3 D Log Plot ' ~~ ~ Company : ConocoPhillips Alaska, Inc. Field : Kuparuk Well : 3C-02 Date : August 28, 2009 , Description : Detail of Caliper Recordings Across Proposed Whipstock P/acement lnterval (7,060~ ~ ' • • S3 Packer 6880 6890 Pup Jt. 6900 6910 3.5" Tubing 6920 --I 6930 Pup Jt. XN Nipple 6940 w/ No Go Pup Jt 6950 6960 ~:: ,~ 3.5" Tubing 6970 ~ • ~ ~ .. . _ ~ 7080 - , _:~ 3.5" Tubing , 7090 _ _ _ _ _ _ Seal A bl 100 9 - :..~ - - =~- - --~,.. ~-~-~ ~;.: _ __._-• - _ _;.~ ssem y ~ ,:h,.. Pup Jt 7110 sos - - i~~ - ~,r : ! Production Casing ~ Whipstock Settirg Min ID (2.875") :............................................ ................... 2500 3500 Nominal I.D. ~ .. ................................................................ 2500 3500 Min I.D. (1/1000 in.) 2500 3500 Comments Depth Max I.D. (1l1000 in.) 3-D Log Image Map 1ft:120ft 2500 3500 0° 0° 90° 180° 270° 0° • Y~~' ~ ~ i '~~~ T~iF'~1'~JI~Y'~~ ~~~~~, Ta, Alaslca ~al and ~as C~nser~»ti~n ~~r~rn. ~ttn.: ~hris~i~°~e Nlahnken 333 ~~Jest 7th f~~i~n~ae, ~~~~~ 100 ~~~~horage, Alasica ~95~1 RE: Perforating Record: 3C-02 ~~~ag~s~ ~, 2~09 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rafael Barreto, Halliburton Wireline & Perforating, 6900 Arctic Bivd., Ancharage, AK 99518 3C-02 Digital Data in LAS format 50-029-21414-00 rfnt, , a~~~~~~:~ ~i~i~ ~ ~ ~E~~.~ ~ ~,ti 1 4 " 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Rafael Barreto 6900 Arctic Bivd. Anchorage, Alaska 99518 Office: 907-273-3527 Fax: 907-273-3535 rafael.barreto@halliburton. com Date: ~~~ o~'~ ~- ~~~ . ~ ~'~~~ ~ ~ °1 Signed: ~~ ~~~ ~ ~. ~ • `~~IELI_ LJ~ I`~'~~`1~1YII~'3'~~Il 'Ta~~ ~lasl~a ~il and ~as ~~ns~~--v~i~~~ C~rr~r~. ~~tr~.: ~hristine iVlahnic~n 3~3 ~J~st 7th !~v°nae, S~iip ? ~~ ~~cho~ag~, ~las~ca '~9~01 RE: Shut-in Bottom Hol~ Pressure / Plug Setting Record: 3C-02 ~~agus~ 5, 2~09 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rafael Barreto, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 3C-02 Digital Data in LAS format 50-029-21414-00 ~iy~'~~~~~% .~1,~~ , ;s. ~U~~i 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Rafael Barreto 6900 Arctic Blvd. Anchorage, Alaska 995I8 Office: 907-273-3527 Fax: 907-273-3535 rafael.barreto@halliburton.com Date: ~°~ ~' ~~~'~~~ ~ ~ ~~~~ ~ ~; 1~ r ~ / ~~ ;; Signed: ~~+ ~~'~ ; ~' ~_ ~-= • ~ ~ • • ~ - ~- ~ ~ u ~-~ ~-~ti o---~-~ ~~ ~~ '_.' ~-~ f~ ~ s k' r F F^ ~ a~ t E f, ~ p~ ° i !1 k M '~ ~ 5 ti @ : ~ r ~ t F "~~ ~ k ku ~k~~~~~ 4 ~ ~~~5 ~~ 4 ~~ ~~~` ~ ~ SARAH PALIN, GOVERNOR s ` ' ,~x^ ~ r. ' ~ ~? ~ ~` k,.~ ~.~. €~ P .. t _ ._ __ ~ ~ _.. ~ ~ ~6 ~SS~ ~~ ~D ~s~aS !~ 333 W. 7thAVENUE, SUITE 100 COi~TSERQATi01~ COMnIISSIOI~T %f ANCHORAGE, ALASKA 995013539 ~ PHONE (907) 279-1433 • FAX (907) 276-7542 Ms. Jill Long Wells Engineer ConocoPhillips Alaska, Inc. P.O. Box 100360 `~j~ Anchorage, Alaska 99510 / 1' ~~ Re: Kuparuk River Field, Kuparuk River Oil Pool, 3C-02 Sundry Number. 309-247 ~~~.~~,:'~~~~.~ Ai1 ~'~ ~ ~ 2009 Dear Ms. Long: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. ~ Chair DATED this~ ~ day of July, 2009 Encl. - ~~~ ~~ ~ .~ , STATE OF ALASKA ~~~~I~~~ • JUL 1 7' ~~OJ ~ ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL ~~~ska ~& Ga~ ~;ons. ~c~mmi~sinn 20 AAC 25.280 " nrhrAr~~~a 1. Type of Request: Abandon ~ Suspend ^ Operational Shutdown ^ Perforate ^ Waiver ~ Other ~ Alter casing ^ Repair well ^ Plug Perforations ^~ ~ Stimulate ^ Time Extension ~ Change approved program ^ Pull Tubi~g ^ Perforate New Pool ^ Re-enter Suspended Well ~ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConoCOPhillips Alaska, It1C. Development ^ Expioratory ^ 185-188 • 3. Address: Stratigraphic ~ Service Q, 6. API Number: P. O. Box 100360, Anchora e, Alaska 99510 50-029-21414-00 ~ 7. If perForating, closest approach in pool(s) opened by this operation to nearest property line 8. Well Name and Number: where ownership or landownership changes: Spacing Exception Requires? YeS NO ~ 3C-02 • 9. Property Designation: 10. KB Elevation (ft): 11. Field/Pool(s): ADL 25634 ~ RKB 84' • Kuparuk River Field / Kuparuk River Oil Pool , 12. PRESENT WELL CONDITION SUMMARY Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth ND (ft): Plugs (measured): Junk (measured): 7635' • 6669' ' 7514' 6577' Casing Length Size MD TVD Burst Collapse CONDUCTOR g0' 16" 110' 110' SURFACE 3861' 9-5/8" 3861' 3735' PRODUCTION 7635' 7" 7635' 6669' Perforation Depth MD (ft): Perforation Depth TVO (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 6991'-7005', 7168'-7172', 7176'-7212', 7231'-7250' 6179'-6190', 6316'-6319', 6322'-6350', 6365'-6379~ 3.5~~ L-8~ 7114~ Packers and SSSV Type: Packers and SSSV MD (ft) Baker S-3 production pkr, Baker F-1 production pkr, seal bore ext 6876', 7090', 7093' TRMAXX-5E SSSV @ 2018' 13. Attachments: Description Summary of Proposal Q 14. Well Class after proposed work: Detailed Operations Program ^ BOP Sketch ^ Exploratory ~ Development ^ Service ^~ ~ 15. Estimated Date for 16. Well Status after proposed work: Commencing Operat July 30, 2009 Oil ^ Gas ^ . Abandoned ^ ~Tu2~jea.~ 17.VerbalApproval: Date: WAG ~ GINJ ^ ,,--~~// WINJ [~(~ WDSPL ~ Commission Representative: g C] ~~rn-~ 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Jili Long @ 263-4093 Printed Name .1111 LOn Title: Welis Engineer Signature ~ Phone 263-4093 Date I~-~ ~( ~,-(~ ~ Commission Use Onl Sundry Number: Conditions of approval: Notify Commission so that a representative may witness ~ Plug Integrity ~ BOP Test ~ Mechanical Integrity Test ~ Location Clearance ^ Other. W~~~c_Ov~~~Cc~V~,p~"~~~~`~~,, Cf~~~C_~C~~ ~~ {~~~ ~C~~~~~ ~ r~~ Subsequent Form Required: ~O~ APPROVED BY ~Q I ~ Approved by: COMMISSIONER THE COMMISSION Date: Form 10~~R~vised 06/2006 ( l~ I~ I n' ~~ p~ Submit in Dupl{cate U ( V ~ C~-~ JUl 2? 20~9 ,,~'.~.. ~7; /7~.C -'r7.' ~..~ Coited Tubing Driliing - r~~s~2oo9 ~~~~~~~~~ Quarter Mile Injection Review 3C-02L1. 3C-02L1-01, and 3C-02L1-02 Assessment of Wells With-in One-Quarter Mile Motherbore: 3C-02 Planned Laterals: 3C-02L1, 3C-02 L1-01, 3C-02 L1-02 Rig: Nabors CDR-2AC Well 3C-02 is an injector with perforations in both the A and C sands. The three CTD faterals planned in this well will provide additional waterflood support to the A2 and A3 sands in three producing wells: 3C- ~ 15A, 36-08, and 3B-09. The C sands are not a reservoir target in this project because of their maturity. Because of this, the C sand perforations will be isolated with cement prior to the commencement of drilling. Currently, the C sand perforations are mechanically isolated befinreen 2 packers and behind tubing. In order to prepare the well for kicking off at ~7060' MD (befinreen the straddle packer completion), a composite bridge plug will be set in the tubing tail, the tubing will be perforated, and the 3.5" tubing by 7" casing annulus will be filled with cement. The cement in the tubing and the bridge plug will then be drilled out and the bridge plug pushed to bottom. A 3.5" monobore flow-through whipstock will be set in the tubing for kicking off. This will allow the A sands in the mother wellbore to remain open to injection. The lateral completions will be completed with 23/" slotted liners. (See the Permit to Drill Summary of Operations for further details.) Two existing wellbores are within a quarter mile of the planned 3C-02 laterals: 3C-01 and 3B-08. Both of these wells are producers and are currently producing from the A sand targets for this project. 3C-01 3C-01 is a producer in the Kuparuk A2, A3, and A4 sands. The minimum distance from the 3C-02 laterals to the bottom hole location of 3C-01 is 500 ft. The minimum distance to the top of the A sand is 660 feet. 3B-08 3B-08 is a single selective producer in the Kuparuk A sands (A1, A3, and A4) and C sands (C1, C3, and C4). The minimum distance from the 3C-02 laterals to the bottom hole location of 36-08 is 1300 ft. The minimum distance to the top of the A sand is 1550 feet. ~ ~,1~~~( v~/ J' ll `~"~' ~f G~~~ , d,n C'-Sa~ ~ 3~-oZ is o~ ~ P~fo~~ f ~no( i ~~ir T~C tn.el~ ~X~-,`6~71 /~e`'~ ,.,.Cn~j C ~ fGRo~ Pe~ E~~i[~-~_7 Q~j6iNll0q%/~,J ~~t o' ~4hd T~ jtcro~ w~// ^or P~onot~ qnc/ S~k i^foi~,n ~~qr ~ td (Sn~ lOd ~ I~/ C f~D~ '`f 70 A~~°n"" l~f in~Qftc i I rD~ICv ~ ~ ric T~yr ige ~a~vcP~ 7~1e 3C - fs'~ t~le C-S4~ ~~rtf / ~' lhvlr,~-/ti~~~q~ ~1 ~~, y,~ ~'/,! a~PG~ f~ C97 to ~ivy rd ~ c- s~~n~l ~IPrFf, ~ ~/~/o, %4-Mile Review Page 1 of 1 ~ ~ ConocoPhittips a~~~ P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 July 15, 2009 Commissioner- State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ~ ~~~~~~~~ ~i~~ z ~ z~o~ ~~aska tlil & Gas Gonv. ~~r~mi~~i~r~ An~harap::~ ConocoPhillips Alaska, Inc. hereby applies for Sundry Approval to plug the C-sand perForations in Kuparuk Well 3C-02 (PTD# 185-188) using cement. Well 3C-02 is currently a 3-1/2" selective single injector. A workover was performed on the well in early June 2009 to upsize the tubing from 2-7/8" to 3-1/2" tubing enabling C7D access to the wellbore (reference Sundry #309-153). The new completion also included a SSSV for downhole lubrication and mechanically isolated the C~ sands in preparation for the sidetracks. The CTD rig, Nabors CDR2-AC, is scheduled to begin work on 3C-02 as early as September 2009. The CTD objective is to drill 3 lateral sidetracks (3C-02L1, 3C-02L1-01, and 3C-02L1-02) targeting the A2 & A3 sands across finro adjacent sealing fault blocks. Nabors CDR2-AC will kickoff at a depth of 7060' (in the B1 shale). This kickoff location will require a finro-string window through the 3.5" tubing and 7" casing using a 2.74" mill. A 3-1/2" flow-through monobore whipstock will be utilized so injection into the A sands in the parent wellbore will be maintained. In preparation for the CTD work, the following work needs to be completed. Slickline: - Tag fill, drift for bridge plug, and obtain a SBHP survey. Eline: - Set 3.5" Fas Drill Bridge Plug in the tubing tail isolating the A sands for the cementing work - Complete a new gamma ray tie-in log - Perforate the tubing interval from ~7080-7085' - Establish injection into the C sand and obtain a C only SBHP/temperature reading Coil Tubing: - Lay in cement plug in the 3-1/2" tubing x 7" casing annulus (NOTE: kickoff point target depth is 7060') - Mill out cement & cement sheath in tubing ~`~ ~^~ ~~~ S~~~~~~ '~'~~~~a~ - Drill out the composite bridge plug and chase to bottom ~~~ Slickline: - Perform dummy whipstock run (~-~ - Tag fill Eline: - Set 3-1/2" monobore whipstock (with RA tags installed) at ~7060' Attached to this Application for Sundry is a proposed schematic of the laterals. If you have any questions or require additional information please contact me at 907-263-4093. Sincerely, ~ Jill Long ~r~ Coiled Tubing Drilling Engineer ' . ; , :' . ~ . . . . ' . . . : ~ ~ ~ ~~~~~~~~ COlr10 ~ ~ ~ coPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 Ju1y 3, 20Q9 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 ~~~~d~~~: ~i.:~h.. a ~~ ~?~J~~ Dear Mr. Maunder: au~: ~ ~ ~~~~ s~la~sk~ ~il ,~ ~as ~c~ns~ ~~~rrmissian A,r-~~~~d~~ ~ ~' ~ ~~ ~ ~---~ ~- ~ ~ Enclosed please find a spreadsheet with a list of wells from the Kuparuk field (KRLn. Each of these wells was found to ha.ve a void in the conductor. These voids were filled with cement if needed and corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The cement was pumped June 16~' & 26~', 2009 and the corrosion inhibitor/sealant was pumped June 23rd & 30~', 2009. The attached spreadsheet presents the well name, top of cement depth prior to filling, and volumes used. on each conductor. Please call Perry Klein or MJ Loveland at 907-659-7043, if you have any questions. Sincerely, ~~f~ MJ Loveland ConocoPhillips Well Integrity Projects Supervisor ~ ~ 1 I s ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Kuparuk Field Date 7/3/09 3 C PAD Well Name API # PTD # Initial top o cement Vol, of cement um ed Finai top of cement Cement top off date Corrosion inhibitor Corrbsion inhibitod sealant date ft bbls ft al 3C-01 500292141300 1851870 22' 2.3 28" 6i2612009 5.9 6/30/2009 3C-02 500292141400 1851880 76' 10.0 22" 6/26/2009 5.1 6/30/2009 3C-03 500292141500 1851890 5' 1.0 21" 6/26/2009 5.1 6/30/2009 3C-04A 500292141601 2020570 4' 1.0 23" 6/26/2009 5.1 6/30/2009 3C-05 500292138900 1851540 24" Na 24" n/a 4.25 6/23/2009 3C-06 500292109600 1840420 6" n/a 6" Na 7.65 6/23/2009 3C-07 500292139100 1851560 37' 5.00 25" 6/16/2009 5.52 6/23/2009 3C-08 500292139000 1851550 12' 2.00 22" 6/16/2009 3.4 6/23/2009 3C-09 500292135500 1851000 20" n/a 20" n/a 2.55 6/23/2009 3C-10 500292135600 1851010 30' 4.10 24" 6/16/2009 4.25 6/23/2009 3C-12 500292135400 1850990 45' 9.30 26" 6/26/2009 4.3 6/30/2009 3C-13 500292142400 1851980 20" n/a 20" n/a 2.12 6/23/2009 3G14A 500292142501 2071750 3' n/a 3' n/a 8.07 6/23/2009 3C-15A 500292142601 2080810 31' 4.40 26" 6/16/2009 2.75 6/23/2009 3C-16 500292142700 1852010 20" n/a 20" n/a 2.12 6/23/2009 3C-17 500292338900 2080590 2'6" Na 2'6" n/a 8.92 6/23/2009 Page 1 of 1 • Maunder, Thc-mas E (QQA~ __ Frorn; Long, Jili UV {Jill;'~N.Long c'~,~conoeophillips.comJ Sent: Monday, July O6, 2Q09 1Q34 AM To: Maunder, Thomas E {~QA) SubJect: R~: KRU 3~-Q2 (185~1~8~ Attachmen#$. 3C-02 RWO Pre and Post W~rk Summary.pdf Tom- ~ Attached is a brief summary ofi the work ~e did pre and post RWO. Le# me know what questions you have. Thanks, ~1h~-~~~Lc1\~~d ~~ `~ ~~ Jill Long ConocoPhillips f~laska Driilin~ and 1tVells (Jffice; 9fl7-263-4093 Cell: 907-240-6574 Fax: 918-G62-6330 ~-~~;~~~'~ u U ~. ..h 4~~ ~, ~ ~ ~ From: Maunder, "ft~omas E (DQAj ~mailtoctom.mau~aderC~alaska.gov) Se~~1t; Sunday, ]uly 05, 2QQ9 11:4$ AM To: Long, .~ill W ~ub,~e~t: Kf~U 3C-~2 {185-188j .lill, 1 am reviewing the 4Q4 for the recent workover on this welL Could you provide a sumrnary of the pre- and post- rig wc~rk? Erriail is fine. Thanks in ad~ance. Tam Maunder, P~ AOGCG 7I6/2009 ~ STATE OF ALASKA ~ ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abandon ^ Repair Well ^ Plug PerForations ~ Stimulate ~ Other ~ Q change tubing size Alter Casing ^ Pull Tubing Q• Perforate New Pool ~ Waiver ^ Time Extension ^ Change Approved Program ^ Operat. Shutdown^ Perforate ~ Re-enter Suspended Well ^ 2. Operator Name: 4. Well Class Before Work: 5. Permit to Drill Number: COnOCOPhillips Alaska, InC. Development ^ Exploratory ^ 185-188 /• 3. Address: Stratigraphic ^ Service Q 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 50-029-21414-00 - 7. KB Elevation (ft): 9. Well Name and Number: RKB 84' • 3C-02 8. Property Designation: 10. Field/Pool(s): ADL 25634 Kuparuk River Field / Kuparuk River Oil Pool • 11. Present Well Condition Summary: Total Depth measured 7635' ` feet true vertical 6669' • feet Plugs (measured) 7150' Effective Depth measured 7514' feet Junk (measured) true vertical 6577' feet Casing Length Size MD ND Burst Collapse Structural CONDUCTOR 110' 16" 110' 110' SURFACE 3861' 9-5/8" 3861' 3735' PRODUCTION 7635' 7" 7635' 6669' Perforation depth: Measured depth: 6991'-7005', 7168'-7172', 7176'-7212', 7231'-7250' true vertical depth: 6179'-6190', 6316'-6319', 6322'-6350', 6365'-6379' Tubing (size, grade, and measured depth) 3.5", L-80, 7114' MD. Packers & SSSV (type & measured depth) Baker ~S-3~ pkr, Baker'F-1' pkr @ sa7s', 7oso' Camco TRMAXX-5E SSSV @ 2018' 12. Stimulation or cement squeeze summary: Intervals treated (measured) not applicable Treatment descriptions including volume s used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation 1674 -- Subsequent to operation SI -- 14. Attachments 15. Well Class after work: Copies of Logs and Surveys run _ Exploratory ^ Development ^ Service ~'' Daily Report of Well Operations ~X 16. Well Status after work: Oil^ Gas ^ WAG ^ GINJ ^ WINJ ^~ ' WDSPL ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 309-153 ° Contact Jill Long @ 263-4093 Printed Name Jill Title Ph 263 4093 Wells Engineer D t ~~~~ '~ r~ Signature one: - a e ~~ ~ Pre ared b Sharon Allsu Drak 263-4612 Form 10-404 Revised 04/2006 ~_ : ~ ~'~. ~1~~ ~~ i~ 1~9~ ~~`t (3 /~ ~ ~~'°~9~ Submit Original Only ~~~~ ConacciP~iliips \ ,.,~:t~,. ttx:. ~___.__3~~Q~fl.9_ 3GO$... ~ ... . . _ . sa,~m~-nc HANGER, 3~ - ~ - i S, cor~ouc.oR. ~ o no 4 SSSVS.2.Otg - ~ ~,F ~ SURFACE, 03.Bfi1 GASLIFT, €~ 6,]52 ~ NIPRE, 6.829 - i F SEPIASSV._ J-' 6.837 \ (~ PBR, 6.836 } 6.876 NIPRE.6,9s0- uPJdm.6.941 - IPERF, ___ 6,991 ~].005 CKER,7,090 ~ SEPL ASSY. 7.088 SBE, 7,093 - sos. z m ~ ~-z~ ~ ~F z'ua-z'~z ' IPERF. -';~ ~ 7.17fi-7.P14 ~ RUG,],150 --~ IPERF. ].431-].250 ~ - PROOUCTION. ~~ ~ I ' 0-],635 ~ TD.7.635 ~ ~ KUP • 3C-02 ,` WeI1.Attributes _ jMax Angle & MD ITD WellboreAPUUWI FieldNam 500292747400 KUPAR e ~~ ~ Well Status Incl (°~ MD (ftKB) ~Act etm ((tK6~ ~~ I UK RNER UNIT IINJ '~~ 42 80 I 4,000.00 / 635.0 ~COmmant IHPS (ppn) Date M t tion IEnd Date KB-Grd (k) Rig Release Dat .____.. SSSV~TRDP I 0 I 7/1/2009 ILastWO: ~ 6/13/20D9 i. 3659 9/1//1985 ~ ~~Annotation Depth (kKB) End Date Annotation Las~ Mod By Entl Date Last Tag~ RKB I 7,252A 5/32009 IRev Reason~ WORKOVER I Imosbor . I 6/16/2009 ' Casing SUings Gasing Description String 0... TString ID ._ Top (HKB) Se~ Dapt~ (1... Set Depih (ND) ... String VW... ~~String ... Sinng Top ThN .CONDUCTOR 16 15.062 00 110.0 110.0 I 6250 ~ H-00 ~~CasingDescription ~,SbingO... StringlD... Top(ftKB) SetDept~(f... SatDepM(ND)...'~.StringWl...IString._ Siri~gTOpThN I SURFACE ' 9 5/S 8J65 0 0 3.861.0 3]34.6 ~ 36.00 I J-SS Casing Descriplion '~~String 0... ;String ID... Top (kKB~ Se~ DepN (f... Set Dep~h (ND) ... IlString Wt... ~String ... ~',Stnng Top Thrd PRODU~CTION 9 I 7 '~ 6.151 0.0 7,635.0 6.669J 26.00 ~i J-55 I ITubin Strin s Tubin Da cri tion String 0... ~'String ID ... Top (f~KB) ~ Se~ Dapth (f... Set Dep~h (ND) . String Wt.. String ... String Top Thrd TUBING P I 3 V2 , 2.992 I 30.6 I 6.849.1 I 6.067.6 I 9-30 I L-80 I EUt 8rd Com letion Details I Top Depth ' ..--~- ~ (ND) Top Incl I~ Top (ftK8) ~~ (ryKg) (°) Item Deacription I CommaM ID (ii ~ 30.6 30.6 0.40 HANGER = 7" x 3 V2" TBG Hangerw/ 3" Type H BPV Profile 3.0: 2,0126~ 2,017.5 OBS SSSVs 3.5" x 2.813"'X' Profile TRMAXX-SE Safery Valve 2.8' 6.829.1 ~~, 6.051.6 37 41 NIPPLE i 2 813" X Nipple I 2.8' 6,836.8I 6A57.8~ 37.48 jSEAL ASSY ILocator and 80~0 Seal Assembly w/ 2'space out ~ ~ 2.95 Tubing Description String 0... IString 10... Top (ftKB) Set Depth (f... Set Depth (ND) IIStr ng Wl_ Strmg... ISt~ing TopThrd UPPER PACKER I 3 U2 2.992 ~ 6.838.1 _ I. .7.096.6 I 6.2612 i 9.30_. ~ L'80.. ~. . EUE 8rd Completion Details ~,~ ToP DePth ~'. __.. . _. _... ~~ (TV~) I ToP lncl ~~ ~I Top (ftK6) ~ (hKB) I (°) Item Description Commant I 10 (ii ~I 6,838.11~ 6,058.8 37.49 PBR i,polish Bore Receptacle ~ ~ 3A( 6,865.6~' 6,080.8 37.71 XO - Enlarging ~3 1/2 EUE Srd Box x 4 V2 IBT Pin 2.95 !~ 6,875.9~ ~ 6,088.9 3J.80 PACKER ~'Baker "S3" Production Packer 3.8; I 6,890_8~ 6,100J 37.92 XO - Reducing 14 1/2 IBT Box x 3 1/2 EUE 8rd Pin Cross over sub 3.0' I 6.939Ji 6.139.1 38.33 NIPPLE IHES 2.813" XN Nioole w/ 2JS' no-0o w/ RHC Pluo w/BALL 8 ROD 2J` .0. I.. 7,114.0 I 62745 9.30 L80 EUhBRD .._'_.. . . ... ._. .. i Commant ID F-1 Produclion Packer 4. Top(TVD) Btm(TVD) Dens Top (ftK6) 84n (HKB) (ftK8) (frKB) Zone Date (sh-~ Typa Commant 6,991 7,005 6,179.3 6,189.8 C-1, UNIT B, 10/15/1985 12.0 IPERF 5" HJ II Csg Gun, 120 deg. phasing 3G02 ~ 7,768 7,172 6,315.9 6,319 0 A-4, 3C-02 10/15/1955 4.0 IPERF 4" HJ II Csg Gun. 90 tleg. phasirg 7,176 7,212 6,322.1 6,350.3 A-3, 3C-02 10/15/1985 i 4.0 IPERF 4" HJ II Csg Gun, 90 deg. phasing 7,231 ~,, 7,250' 6,364.5 6,378.6~,A-2, 3C-02 10/15l1985I 4.011PERF 4" HJ II Csg Gun, 90 deg. phasing _ _ . _.. .. . . i _ ___ _ I ~ _ _.. .. Notes:_ General 8 Safety End Date AnnoUtion I6/16/2009 INOTE: VIEW SCHEMATIC w/Alaska Schematic9.0 7 .P..._. . .. .._. .. . . .. ..POrt . . .. ....__- cl OD Valva Latch Size TRO Run ~ Make Model (nj Serv Type Typa (~n) (psi) Run Date Com... 14 CAMCO KBMG ~ 1 GAS LIFT SOV BEK 0.000 0.0 6/12/2009 ~ • 3C-02 Pre and Post Rig Workover Wel-work Summary Well Name: 3C-02 API / UWI: 500292141400 Field Name: KUPARUK RIVER UNIT Well Type: injectar Pre-Rig Wellwork tart ate umma 5/3/2009 _ LOCKED OPEN S~SV ~ i$15' RKB. ~O~AT~D TBG TAIL ~ 7U95' ~, 71 ~15' RK$. _ TAGGED EST. 7252' RK$. RE~Y FOR SAND PLUG. 5/6/2009 . _ . ~'~~P ~and piUg to cover per€s pre WO. Pumped 2~ 2Ul40 sand, in ~(3 ~g ge1. pumpee! 1 bbt~ FP diese! i~ flush. JOB COMPLET~ . 5/7/2009 _ _ __ _ _ _ TAG SAND PLUG @ 7081' SLM. PUMP ON SAND PLUG DOWN HOLE W/ LRS, FINAL TAG 7119' SLM E~TiMATE 793~' R!<8, J0~3 IN PR~3~RESS . _ _ __ _ _ _ _ . _ __. _ SET CATCHER SUB ~ 7107' RKB. (2.29" NO GO, GOOD DRIFT FOR POWER CUTTERS) 5/8/2009 PULLED DMY VALVE @ 6777' RKB, LEAVE POCKET OPEN. BAILED SAND OFF & PULLED CATCHER SUS 71fl7' FtKB. J~€3 IN PR4GRESS 5/9/2009 TAKE SBHP MEASUREMENT AT 699'I' f~KB (4245.7 PS1PA /9 533:9 DEG F) ~ip POVII~RJET CUT THE TUBING AT 7034' AND 6972'. SAT DOWN AT 7102' (D NIPPLE AT 7107'). 5/13/2009 ' POWERJET CUT THE 2 7/8" TUBING AT 6866' AND 6801'. TUBING AND IA PRESSURES ' UNCHAt+1GED ~E~ORE AND AFTER CIJTTI~G. Post-Rig Wellwork S~taar# t3arte _ umma __ ._ _ _ f'IJLL€D 1" S4V AND SET t3MY ~ 67~2' FtKB. PUL~LE[3 2.8i" #2#i~ PL~1~ ~ fi939' RFCR 6/20/2009 MITT & MITIA TO 2500#, PASSED. ATTEMPT TO SHEAR SOS, UNSUCCESSFULL. IN PF~tl(~',RE~S. . 6/21/~Uf39 _ _ _ _ _ _ _ __ ~H~~D S~S 7193' R}~B, TAG SANA PL~1G 7316' SL~II. JOB CS3MPL:ETE. PERFORM SAND PLUG CLEANOUT T0 7315 CTMD, USED SLB JET NOZZLE TO GET 6/28/2009 l'HROUGH LA~T 7U0 FT OF F~('fR€MELY N/~f3f3 ~aAN~, APPROX 8fl' lZATF~Ot_E, V~IE~:L IS Ff2E€~E PRQTE~TED. ~~~~~~~~~~~~,~ Time Log & Summary WeJtview Web ReporYing Re po rt 24 hr Notice was given to AOGCC @ 0730 hrs on 6-1-09 and witness of test was waived by Jeff Jones @ 18:30 hrs on 6-1-09 08:30 15:30 7.00 MIRU MOVE MOB P Start moving rig from 31 pad to 3C pad. 24 hr Notice was given to AOGCC @ 07:30 hrs on 6-1-09. 15:30 17:00 1.50 MIRU MOVE PSIT P Set rig mats and herculite for containment. Spot rig over well. Set mud shack, cuttings box and boiler blow down tank. Accepted Nordic 3 rip (a~ 16:00 hrs 6-1-2009. 17:00 23:00 6.00 COMPZ RPCOM RURD P Load pits with KWF (13.9 ppg). Load lubricator in i e shed and up to rig floor. Set up kiil tank and hardlines to well. Test hardline at 120 psi with air, then 250/4,000 psi, condition mud, pulled BPV, 1,850 on tbg, 1,800 psi on IA, 60 psi on OA, RU circ lines in cellar, load 3 1/2" DP while conditionin mud. 23:00 00:00 1.00 COMPZ RPCOM KLWL P Notified security and DSO of possible gas venting, broke circ down tbg at 2 bpm, maintaining 1,850 psi on choke for 686 strokes (tbg volume) then 450 psi on tbg to kill well. throuah open GLM at 6.777'. Pump 245 bbls KWF, attempt to bull head down to bottom of top perfs, ensure well is dead, install BPV, ND tree, NU BOP, test BOPE at 250/4,000 psi, pull test plug, MU landing jnt, BOLD's, pull hanger to floor, reverse circ 2 tbg volumes to clean well. POOH laying down and strapping 2 7/8 decompletion f/ 6,801 U 2, 800'. 00:00 04:00 4.00 COMPZ RPCOM KLWL P Cont pumping KWF (13.9) at 2 bpm maintaining 450 psi on tbg for a total of 4,200 strokes, took returns to pits once we started getting 12.5 ppg KVVF back, to keep solids out of kili tank, with 13.5 ppg returns attempted to bullhead 5 bbls down to_ bottom of o en erfs at 7 005'. Could not bull head, CBU at 2 bpm - 790 psi through choke, taking returns to 04:00 05:00 1.00 COMPZ RPCOM OWFF P Monitor well for 15 minutes, well static, blow down circ lines, RD circ lines, installed BPV. 05:00 07:00 2.00 COMPZ RPCOM NUND P ND tree, instali test dart. Check han er threads. 07:00 10:00 3.00 COMPZ RPCOM BOPE P NU BOPE and function tested. 10:00 15:30 5.50 COMPZ RPCOM BOPE P ~est BOP rams for 2 7/8" & 3 1/2" along w/choke to 250/4000 psi and annular to 250/3500 psi. Witnessing of test waived by Jeff Jones AOGCC) 18:30 hrs 6-1-2009. 15:30 16:30 1.00 COMPZ RPCOM PULL P Pull test dart and B . PU & MU Landing jt. BOLDS. Pull hanger loose @ 50K, pulled hanger to rig floor w/70K 16:30 17:00 0.50 COMPZ RPCOM CIRC P Reverse circulate two tubina volulmes 80 bbls) to clean up. ICP= 1150 psi @ 4 BPM, FCP = 1260 psi @ 4 BPM. Shut down monitor well. Static. 17:00 21:00 4.00 6,801 4,957 COMPZ RPCOM PtJLL P BD top drive. !D hanger and landing jt. Make up control line to spooler. 7/8" tubing and jewelry and spooling up controi line to 4,957'. Recovered 33 Stainless Steel Bands. 21:00 21:30 0.50 4,957 4,957 COMPZ RPCOM OTHR P RD and offload Schlumberger control line s oolin unit. 21:30 00:00 2.50 4,957 2,800 COMPZ RPCOM PULL P Continue to POOH laying down and strapping 2 7/8" decompletion string f/ 4,957' U 2,800' 75k up wt, 50k dn wt. 6/03/2009 Continue to POOH laying down 2 7/8 decompletion f/ 2,800'. Clean and clear rig floor and pipe shed. Bring fishing tools to rig floor. PU and MU Fishing BHA 1 and RIH PU 3 1/2 DP to TOF @ 6,801', engage and POOH w/ fish. MU and RiH w/ Fishin BHA #2 to 6,861', ather arameters and be in CBU. 00:00 03:30 3.50 2,800 0 COMPZ RPCOM PULL P Continue to POOH laying down and strapping 2 7/8" decompletion string f/ 2,800' to cut jt. Recovered 15.11' of 2 7/8 TBG, Cut was flared to ,~25". All Tubulars pulled had no s corrosion si ns. 03:30 05:30 2.00 0 0 COMPZ RPCOM OTHR P Clean and clear rig floor and prepare to RIH w/ Fishin BHA 1. 05:30 11:00 5.50 0 6,781 COMPZ FISH PULD P PU and M F' ' A 1 PU drill pipe and RIH to 6781' just above fish. MU last jt. screwed into TD. Lowered strin down and ta ed to of fish 6796'. PU 10'. 11:00 12:00 1.00 6,781 6,781 COMPZ FISH CIRC P Established circulation and pumped bottoms up (a~ 4 BPM w/1180 psi. 12:00 13:00 1.00 6,781 6,802 COMPZ FISH FISH P Estabished parameters. Up wt circ. 110K Dwn wt circ. 85K. Rot Wt 95. Pumping 1 BPM w/250 psi, 50 RPM, Dresssed off 2 7/8"tubin flare Power Cutter 6796'. Slacked down 2.7' had pressure increase from packoff to 700 psi. Shut down pump, and stop rotating, bled off pressure. Continue slacking down 4.10' to overshot top sub. Set 5K down. PU ~ pulled to 150k and fish move continue to uli u to 165K ulied free, sto with OEJ 5' u on slick stick and presssure up to 400 psi. PU u remainder 3' and ressure bled off indicatin OEJ comin off of slickstick. PU up another 5' and attempt to circ., Pumping 14 spm @ 680 si. 13:00 17:00 4.00 6,802 224 COMPZ FISH PULL P PJSM. POOH standing back drill i e 17:00 19:30 2.50 224 0 COMPZ FISH PULL P POOH w/ BHA #1 and Lavdown 66' of Fish consisting of 16' of 2 7/8 TBG Stub, 8' 2 7/8 Pup joint, 17.5' OEJ, 8' HRP PKR, 16' of 2 7/8 TBG Stub flared f/ 3.375" to 3.5". 19:30 20:00 0.50 0 0 COMPZ FISH SVRG P Conduct daily rig service on crown and blocks. 20:00 21:00 1.00 0 224 COMPZ FISH PULD P PU and MU Fishin4 BHA #2 same as Fishinq BHA #1 w/ new 2 7/8 Gra le. RIH to 224'. 21:00 23:00 2.00 224 6,861 COMPZ FISH TRIP P RIH w/ Fishing BHA #2 f/ 224 U 6 861' and Ta u on TOF. 23:00 00:00 1.00 6,861 6,861 COMPZ FISH CIRC P CBU @ 4 bpm / 68 spm @ 1,200 si. Seen 7,950 units of as at BU. 6/04/2009 Continue to Circ., Dress off TBG stub and Engage fish. POOH and Lay down fish. PU and MU BHA #3 and RIH to TOF 6,967', En a e and POOH. La down Fish. PU and MU Fishin BHA # 4 and RIH to 7,015' 00:00 00:30 0.50 6,861 6,861 COMPZ FISH CIRC P Continue to circulate surface to surface @ 4 bpm / 68 spm @ 1,200 si. until as was circulated out. 00:30 01:30 1.00 6,861 6,868 COMPZ FISH FISH P Dress off TBG Stub 6 861' w/ 51 rpm's @ 3k torque and fish fell beside it self b 15'. Continue to dress off @ 6,876' @ 51 rpm's @ 4 to 5k torque. Slide over 7.5' to 6,884' and no go. PU above original tag and. re tag 15' high were or inal no 0 was to be seen. 01:30 03:30 2.00 6,868 224 COMPZ FISH TRIP P to 224' standing back DP. 03:3~ 04:00 0.50 224 0 COMPZ FISH PU~D P Standback DC's and lay down fishing 04:00 06:00 2.00 0 0 COMPZ FISH PULD P La down 105.48' of 2 7/8F decom letion. 15.38 ' of 2 7/8 TBG stub, 6.72' GLM, 30.26' & 31.12' - 2 jts of 2 7/8 TBG, 6.84' GLM, 15.16' of 2 7/8 TBG stub. Stub was flared to 3 1 /8". 06:00 08:00 2.00 0 284 COMPZ FISH TRIP P MU tools for runninq washpipe, BHA # 3. PU, MU BHA and RIH to 284'. 08:00 11:00 3.00 284 6,967 COMPZ FISH TRIP P RIH w/BHA #3 on drilipipe from derrick from 284' filling pipe every 25 stands to 6967'. 11:00 12:30 1.50 6,967 6,967 COMPZ FISH CIRC P CBU to condition mud and remove any gas, 2 BPM W/2150 psi. Small trace of as in BU. 12:30 13:30 1.00 6,967 7,023 COMPZ FISH FISH P Slow pump rate down to 1 BPM w/1000 psi. Lowered down over top of fish 6967', continued slacking down slowly over blast ring jt from 6987' w/no resistance, continue slacking to 7000', taking wt. PU and tried to work down couid not. PU and rotate down very slow. Continue rotating down to 7018', pressure increase,stopped pump and stopped rotating. Engauged spear w/ 10K down for 4' bottomed out. PU and had 4 to 5K overpull for 22' decreased to 1000K over up wt. Sto ed 7001'. 13:30 14:00 0.50 7,001 7,001 COMPZ FISH OTHR P Dropped ball & rod for PO sub. Wait 15 min. pressured up to 2600 psi and sheared PO sub. Blow down TD. 14:00 17:00 3.00 7,001 284 COMPZ FISH TRIP P PJSM. POOH standing back drill i e. 17:00 17:30 0.50 284 284 COMPZ FISH TRIP P Stand back drill collars and LD fishin tools. 17:30 20:00 2.50 0 0 COMPZ FISH PULL P Cut out and LD fish consisting of 16.12' stub - 2 7/8" tubing, .93' -2-xover pup, 1-30.64' jt BTC Blast jt w/24' of Blast rings, and 14.39' stub - 2 7/8" tubing. Stub was flared to 3.5" - 3.625". 20:00 20:30 0.50 0 0 COMPZ FISH OTHR P Clean Rig floor and kick out un-needed tools 20:30 21:30 1.00 0 224 COMPZ FISH PULD P PJSM, PU and MU BHA #4. 21:30 23:30 2.00 224 7,000 COMPZ FISH TRIP P RIH w/ Fishin BHA #4 on 3 1/2 DP to 7,000' 125k up wt, 90k dn wt. MU TD. 23:30 00:00 0.50 7,000 7,015 COMPZ FISH CIRC P Break Circulation @ 2 bpm @ 980 si, RIH and Ta fill 7,015'. 6/05/2009 Condition Mud and Circulate Surf/Surf. Engage, pull seals from PKR. POOH and lay down fish. PU and RIH w/ BHA #5, Mill on WD PKR f/ 7,085 to 7,087'. 00:00 02:00 2.00 7,015 7,032 COMPZ FISH CIRC P Condition surface Mud for low PH. Circulate suf/surf @ 5 bpm @ 1,510 psi and work thru tight spot f/ 7,010' to 7.015' and down to 7,032'. 02:00 0230 0.50 7,032 7,039 COMPZ FISH FISH P Dress off 2 7/8 TBG stub @ 50 rpm's w/ 4k free torque and slide over fish ' 25' in on jt 211) Pull seals from "WD" PKR @ 20k osw of 115k up wt. Pump @ 1.5 bpm @ 800 psi and locate PKR w/ seals. 02:30 05:00 2.50 7,039 224 COMPZ FISH TRIP P POOH w/ fish standing back 3 1/2 DP to 224' 05:00 05:30 0.50 224 0 COMPZ FISH PULD P POOH w/ BHA #4 05:30 07:00 1.50 0 0 COMPZ FISH PULL P~ Laydown 16' of 2 7/8 TBG stub, 6.86' GLM, 29.97' 2 7/8 TBG jt, 7.51' Seal ass . 07:00 08:00 1.00 0 243 COMPZ FISH PULD P MU & RIH w/BHA #5 for millinq over ~ WD' packer and retrieving same to 243'. 08:00 12:00 4.00 243 7,090 COMPZ FISH TRIP P RIH on 3 1/2" drill pipe to 7000'. Obtained parameters. Established circulation 3 BPM @ 1225 psi Up wt 113K Dwn wt 90K ROT wt 100K. 80 RPM. Taaaed tiQht soot Ca~ 7011' milled thru to 7013'. Reamed up and down thru tight spot until polished off and free falling. Continue down hole and tapqed packer (a~ 7085' with PRT ra le 7,090'. 12:00 00:00 12.00 7,090 7,092 COMPZ FISH MILL P Milled on Otis'WD' Packer f! 7,085' U 7 087'. 125k Up wt., 90k Dn wt., 100k Rot wt. 3,500 ft/Ibs Free Torque @ 80 to 105 Rpm's. WOM 10 to 15k w/ 4,000 to 5,000 ft/Ibs torque. Pump pressure @ 1 bpm = 760 psi, @ 3 bpm = 1,900 psi, @ 5 bpm = 2,400 psi. Pumped weighted Hi h visc swee 23:00 hrs. 6/06/2009 Continue to mill on Otis'WD' PKR f/ 7,087' to 7,088'. Circ Surf/Surf. Engage PKR and POOH. MU and RIH w/ BHA #6 and Retrieve PKR remainents. RU Eline and RIH w/ 5.95" Gage ring and JB to 7,122' ORKB ELM. POOH. 00:00 01:30 1.50 7,093 7,121 COMPZ FISH MILL P Milled on Otis'WD' Packer f/ 7,087' mill. 125k Up wt., 90k Dn wt., 100k Rot wt. 3,500 ft/Ibs Free Torque @ 80 to 105 Rpm's. WOM 10 to 15k w/ 4,000 to 5,000 ft/Ibs torque. Pump pressure @ 1 bpm = 760 psi, @ 3 bpm = 1,900 psi, @ 5 bpm = 2,400 psi. Chase down hole and set down 7,097' mill w/ tail @ 7,121'. PU to 7,087' PRT Gra le. 01:30 03:00 1.50 7,087 7,087 COMPZ FISH CIRC P Circulate Surface to Surface @ 5 bpm @ 2,200 psi, Drop ball and Rod shear out pump out sub @ 2,600 psi um in 2 b m. 03:00 06:00 3.00 7,087 243 COMPZ FISH TRIP P PJSM, RIH U 7,097' (a~ mill and set down 20k. POOH to BHA #5 06:00 08:00 2.00 243 0 COMPZ FISH PULL P Stand back drill collars and LD BHA. Retrieved bottom cone from WD, acker. Fish remainin in hole consists of bottom of packer from bottom slips down, mill out extention, xover, 2 7/8" pup jt, Camco'D' nipple, 2 7/8" pup, and shear out sub. Total len th 24.27'. 08:00 09:00 1.00 0 0 COMPZ FISH OTHR P Prepare jars and BS for running 2 5l16" spear, wait on delivery of 09:00 09:30 0.50 0 COMPZ FISH TRIP P MU s ear on BHA #6. 09:30 13:00 3.50 0 7,018 COMPZ FISH TRIP P RIH on 3 1/2" drilipipe to 7018'. 13:00 14:00 1.00 7,018 7,119 COMPZ FISH FISH P MU TD Establish circulation 1.5 BPM w/2180 psi. Up wt 115K dwn wt 90K. Slacked down over to of fiSh 7097'. Engauged spear, set down on top of xover @ 7114' pressure increased, shut pump off and pushed grapple inside 2 7/8" pup 5' to 7119'. Set down 10K. PU 62' with no drag. Kicked pump on and established circulation, shut down, bled off. Break connection, drop ball and rod for PO sub. Wait 15 min. pumped ball on seat and shear PO sub @ 2150 si. 14:00 18:00 4.00 7,119 237 COMPZ FISH TRIP P POOH standing back 3 1/2" drillpipe. 18:00 19:30 1.50 237 0 COMPZ FISH PULL P LD BHA #6 with fish. Retrieved bottom 1' of WD packer, Milled out extention , xover, 2- pup jts @ 7/8" and 1-'D' nipple. All of decompletion recovered. 19:30 20:30 1.00 0 0 COMPZ FISH OTHR P Kickout Baker Fishing Tools and Wash out BOP Stack. 20:30 00:00 3.50 0 0 COMPZ FISH ELNE P PJSM. RU HES Wireline and RIH w/ 7,122' ELM to ORKB. POOH w/ 6/07/2009 Continue to POOH and Recover multiple pcs of PKR, RIH w/ same to 7,127' and POOH. Recover more junk, RIH to 7,012' and set down w/ PKR. POOH and LD. PU and MU BHA #7 and RIH to 7,009' w/ 6.151 String mili dress ti ht s ot to 7,012'. 00:00 08:30 8.50 0 0 COMPZ FISH ELNE P Continue to POOH and empty JB - recovered multiple pcs of PKR - metal and rubber. RIH to 7,127'. POOH and recover 2 large pcs metal. RIH to 7,129', POOH recovered 1 large pc metal, slips and misc. RIH to 7127' POOH and recovered smali cs metal mostl shavin s from millin acker. Break out au e rin and 'unk basker. 08:30 10:00 1.50 0 COMPZ RPCOM ELNE P MU BHA for lower F-1 packer. MU on Halliburton E-line runninq tool. 10:00 11:00 1.00 COMPZ RPCOM ELNE T Noticed wireline damaged, broke off to of runnin and made re-head. 11:00 17:00 6.00 COMPZ RPCOM PACK P MU head back to running tooi on packer and RIH. Running in hole very slow approximately 50' per min. Correlated w/ CBL log ran on 9/30l85. Bottom of Packer stacked . out at 7012' , tubin tail 7033'. Picked up 60', attem ted a ain but stacked out at same place. POOH w/lower packer assy and lay down same. 17:00 17:30 0.50 COMPZ RPCOM OTHR T Load Baker Fishing tools for mill run 17:30 19:00 1.50 COMPZ RPCOM SVRG P Slip and cut 90' of drill line. 19:00 20:00 1.00 0 232 COMPZ RPCOM PULD T PJSM, PU and MU RCJB and Strina mili combo BHA #7 and RIH to 232' 20:00 23:00 3.00 232 7,013 COMPZ RPCOM TRIP T RIH w/ BHA #7 to 7,013' on 3 1/2 DP. 130k u wt, 90k dn wt. 23:00 00:00 1.00 7,013 7,055 COMPZ RPCOM MILL T MU TD and Dress off tight spot f/ ' w! 6.151" OD String mill w/ RCJB @ 7,052' U 7,055'. 130k up wt, 90k dn wt, 105k Rot wt @ 100 rpm's W! 6,000 ft/ibs torque. 3,500 - 4,000 ft/Ibs free tor ue. 6l08/2009 Continue to dress tight spot and clean out to 7,139' w/ RCJB. POOH and LD BHA #7. RIH w/ F-1 PKR assy on Eline to 6,999' unable to get past. POOH and RIH w/ F-1 PKR assy on DP to 7,126'. RU Eline and Correlate. 00:00 00:30 0.50 7,055 7,034 COMPZ RPCOM CIRC T Wash down to 7 134' w/ Reverse circulating Junk Basket rotating @ 80 rpm's and circulating @ 5 bpm @ 2,500 psi. Unable to qet ~ast this de th - indicates 6.151" OD strin mill tor uin u 7,090'. 00:30 03:30 3.00 7,034 232 COMPZ RPCOM TRIP T Blow down TD and POOH f/ 7,134' to 232' 03:30 04:30 1.00 232 0 COMPZ RPCOM PULD T Stand back 1 stand DC's and laydown BHA #7. Recovered 2' Barite saq core and one lower packer sli . 6.059" OD string showed little sign of engagment along with 6.151" OD upper mill. Torque was probably due to full RCJB w/ no circulation around it. 04:30 05:00 0.50 0 COMPZ RPCOM PULD T Kick out Baker fishing tools and load ouf. Ciean ri floor. 05:00 06:30 1.50 COMPZ RPCOM OTHR T Wait on Halliburton E-line. 06:30 11:30 5.00 COMPZ RPCOM ELNE T PJSM. RU E-line. MU Baker F-1 acker on E-lin s tincLtool. RIH to 6900', log coming up to 6400' and correlate w/ GBL ran on 9/30/1985. Continued in hole and stacked out w/ acker 6999' bottom of F-1 acker. PU 100' and attempt to go down aaain with same results. 11:30 14:00 2.50 COMPZ RPCOM ELNE T POOH w/ F-1 packer assy on E-line. Set packer in mouse hole and rig down E-line. 14:00 21:30 7.50 0 7,126 COMPZ RPCOM PACK T MU H draulic settin tooi on acker and RIH on 3 1/2" drill pipe to 7,126'. 122k U wt, 92k Dn wt. 21:30 00:00 2.50 7,126 7,126 COMPZ RPCOM ELOG T PJSM, RU HES Eline and RIH w/ CCL-Gamma Ray Log Correlate for F-1 PKR set depth. Needed to raise up 12' to have packer on depth of 7,090' for tie in correction. POOH w! Tools to 5.500'. RD Eline. Attempt to set PKR - failed - troubie shoot. RIH w/ DP to 4,644', PU Baker Storm PKR and RIH U 99', set and Test U 1,000 psi. w/ tail @ 4,750'. ND BOP & TBG Spool. Pull Pack-offs & replace w/ new. Install New TBG Spool and NU BOP. 24 hr Notice given to AOGCC @ 1905 hrs on 6-8-09 and Witness of Test Waived by Lou Grimaldi @ 1955 hrs on 6-9-09. 00:00 00:30 0.50 7,126 7,126 COMPZ RPCOM ELOG T RD HES Eline. 00:30 05:30 5.00 7,126 7,063 COMPZ RPCOM PACK T PU pipe 12' to correlate top of packer @ 7,090' by Eline Gamma ray. Drop 7/8 ball, wait 15 minutes to drop to seat, circulate @.5 bpm @ 650 psi. Pumped 4 bbls to seat ball, pressured up to 2,200 psi, PU on DP w/ no overpull, Drop back to below setting depth and PU to desired depth. Pressure up to 3,000 psi and PU w/ no overpull, dop back to desired depth. Pressure up to 3,500 psi, PU w/ no overpull, drop back to desired depth. Pressure up to 4,000 psi, PU w/ no overpuil, drop back to desired depth. Bleed back to 0 psi and re- pressured to 3,500 psi, PU w/ no overpull, drop back to desired depth. Pressure up to 4,200 psi, PU w/ no overpull, drop back to desired depth. POOH LD 2 jts. Called Baker Prod Sho for assistance. RIH to desired set de th. Reverse circ .5 b m 830 si, increase to 1 bpm @ 980 psi, increase to 1.5 bpm @ 1,110 psi, increase to 2 bpm @ 1,170 psi and 3 bpm @ 1,310 psi for 60 bbls. Pump down DP @.5 bpm @ 700 psi. Drop 1.43" Ball & circ @ 1 bpm @ 840 psi and increase to 1.5 bpm @ 940 psi for 2 DP volumes. BaU-never seated or the settin tool shifted not settin the acker. POOH and LD 2 jts DP to I 05:30 06:00 I 0.50 7,063 7,063 COMPZ RPCOM OTHR T Blow down TD, fili trip tank, clean I floor. 06:00 10:30 4.50 7,063 50 COMPZ RPCOM TRIP T POOH standin back DP. Up weight = 122K 10:30 12:00 1.50 50 0 COMPZ RPCOM PULD T LD packer and setting tool. Load out and shi to Baker for ins ection. 12:00 14:30 2.50 0 4,644 COMPZ RPCOM TRIP P PJSM, MU bullnose and RIH w/3-1/2" DP to 4644'. 14:30 15:30 1.00 4,644 4,750 COMPZ RPCOM PACK P MU storm acker set 99' RKB. 15:30 16:00 0.50 4,750 4,750 COMPZ RPCOM PRTS P Test storm packer to 1000 psi / 15 min. 16:00 19:30 3.50 4,750 4,750 COMPZ RPCOM NUND P ND BOPE and TBG Spool 19:30 20:00 0.50 4,750 4,750 COMPZ RPCOM OTHR P 7" CSG Pack offs and change out w/ New Primary Pack off 10" x 7" WC Special and YB 9 1/2" C-Bore x 7" Seconda Pack off. 20:00 00:00 4.00 4,750 4,750 COMPZ RPCOM NUND P Set New McEvoy Gen IV - 11" 3M Bottom x 7 1/16" 5M Top TBG Spool and NU DSA and 13 5/8 5M BOP Stack. 6/10/2009 Continue to NU BOP, Test @ 250/4,000 and annular @ 250/ 3,500. Release Storm PKR and POOH. PU and MU C/O BHA # 8. RIH to 7,130', Reverse Circ well clean. POOH and LD BHA #8 PU & RIH w/ F-1 PKR Ass to 569'. 00:00 01:30 1.50 4,750 4,750 COMPZ RPCOM NUND P Continue to NU BOPE 01:30 02:00 0.50 4,750 4,750 COMPZ RPCOM OTHR P Install Test plug and fill BOP Stack 02:00 05:30 3.50 4,750 4,750 COMPZ RPCOM BOPE P Test BOPE @ 250/4,000 si an~i Annular @ 250/3,500 psi. 24 hr notice was given @ 1905 hrs on 6-8-09 and Witness of test waived by Lou rimaldi 1955 hrs on 6-9-09. 05:30 07:00 1.50 4,750 4,650 COMPZ RPCOM PULD P Set wear ring, clean rig floor. MU retrieval tool, latch into storm packer @ 99', POOH and lay down storm acker. 07:00 08:00 1.00 4,650 2,712 COMPZ RPCOM TRIP P POOH standing back DP to 2712'. U wt = 86K 08:00 09:30 1.50 2,712 2,712 COMPZ RPCOM SVRG P PJSM. Crane on location, putt out centrifu e, service ri . 09:30 10:30 1.00 2,712 0 COMPZ RPCOM TRIP P Continue to POOH, up wt = 75K. 10:30 12:00 1.50 0 153 COMPZ RPCOM PULD T Clean floor. MU clean out BHA #8. 12:00 14:00 2.00 153 7,116 COMPZ RPCOM TRIP T RIH w/ 3-1/2" DP to 7116'. Up wt = 125K, down wt = 93K. 14:00 17:00 3.00 7,116 7,116 COMPZ RPCOM CIRC T Reverse circulate hole volume 4 bpm @ 1400 psi. Reverse 2 x 20 bbl viscous sweeps to surface while rotatin 10 r m. 17:00 21:00 4.00 7,116 153 COMPZ RPCOM TRIP T Drop 2.312" drift down the DP. Blow down TD. POOH standin back DP. 21:00 22:30 1.50 153 0 COMPZ RPCOM PULD T La down BHA #8 and clean ma nets. ma nets were full of various miltinqs and shavinqs. No returns in boot baskets. Clean and clear rig floor of fishing tools and offload from the ri4. 22:30 I 00:00 I 1.50 I 0 I 569 ICOMPZI RPCOM IPULD to 569' 6/11/2009 Continue to RIH f/ 569' to 7,112'. RU HES Eline and correlate. RD Eline and set PKR @ 7,090'. Shear out of PKR and POOH. PU and RIH w/ S-3 PKR and selective Completion. Locate and nogo. Spot PKR Fluid. Drop ball and Rod, Set S-3 PKR and Shear out of PB. Swap 13.9 ppg KWF w/ 8.5 ppg SW. POOH laying down DP f/6,838' U 6,5.13'. 00:00 04:00 4.00 569 7,126 COMPZ RPCOM TRIP T Continue to RIH w/ F-1 PKR assy f/ 569' t/7,124', 04:00 07:30 3.50 7,126 7,126 COMPZ RPCOM ELOG T PJSM, RU Eline and RIH w/ CCL-Gamma Ray to 7080'. Tie in with CBL 9/30/85. POOH with Eline and RD. 07:30 08:00 0.50 7,126 7,126 COMPZ RPCOM CIRC T RU to pump down DP. Circulate 1 DP volume 12 b m 1250 si. 08:00 09:00 1.00 7,126 7,114 COMPZ RPCOM PACK T Ad'ust acker de th to 7090'. Drop ball, start pumping 1 bpm @ 900 psi. Pressure up to 2500 psi after 23 bbi. PU 125K and sheared out of F1 packer, pressure dropqed and up wt. = 120K. 09:00 11:30 2.50 7,114 20 COMPZ RPCOM TRIP P POOH standing back DP. 11:30 13:30 2.00 20 0 COMPZ RPCOM PULD P LD & KO setting tool. Swap floor e ui ment, com letion order 13:30 15:00 1.50 0 260 COMPZ RPCOM PULD P PJSM. PU and MU straddle packer 15:00 19:30 4.50 260 7,089 COMPZ RPCOM RCST P RIH with straddle packer on DP f/ 260' U 7,089'. 120k u wt, 89k dn wt 19:30 20:00 0.50 7,089 7,089 COMPZ RPCOM CIRC P Pump 20 bbls corrosion inhibited 13.9 ppg KWF and displace w/ 45 bbls KWF 3 b m 1,350 si. 20:00 21:00 1.00 7,089 6,838 COMPZ RPCOM PACK P Drop ball and rod, wait 30 minutes to fall onto seat @ 6,941', Pressure up to 1 500 si - Slack off 40k and increase pressure to 4,000 psi for 15 minutes. Shear out of PBR 6,838' w/ S-3 PKR 6 877'. 21:00 22:30 1.50 6,838 6,838 COMPZ RPCOM CIRC P Displace 13.9 ppg KWF w/ 40 bbl high visc sweep, followed by 50 bbl 8.5 ppg Seawater, followed by 40 bbl high visc sweep, followed by 230 bbl 8.5 ppg Seawater. Circulating max rate keeping pump pressure under 3,500 si 22:30 23:00 0.50 6,838 6,838 COMPZ RPCOM OWFF P Monitor well for flow - static 23:00 00:00 1.00 6,838 6,513 COMPZ RPCOM PULD P PJSM, Blow down TD and POOH la in down 3 1/2 DP coatin connections for stor f/ 6,838' t/ 6.513' 113k u~ wt. 100k dn wt. Cont' to POOH laying down 3 1/2 DP f/ 6,513', Lay down seal assy. PU & MU Upper 3 1/2 Completion & RIH to 6,850'. S ace out & land Han er. RILDS, PT TBG to 3,000 si for 15 min. 00:00 08:30 8.50 6,513 0 COMPZ RPCOM TRIP P Continue to POOH laying down & kicking out 3 1/2 DP, coating connections for stora e f/ 6,513' 08:30 10:00 1.50 0 0 COMPZ RPCOM RURD P Pull wear ring. Swap floor equipment. Comoletion eauipment in order 10:00 22:00 12.00 0 6,839 COMPZ RPCOM RCST P PJSM. MU seal assembly. RIH with 3-1/2" completion to 4, . ns a SSSV and RU Sheave and control line. PT control line to 6,000 psi - Good test. Continue to RIH f/ 4,820' to 6,851' and No-go. PU 2' and mark pipe, space out and MU hanger and landin ~oint. Tie in control line. 22:00 23:00 1.00 6,839 6,839 COMPZ RPCOM CIRC P Circulate 181 bbis @ 4 bpm @ 220 psi, bottoms up clean. Pump 181 bbis of Seawater w/ CRW 132 - 1°/a by volume @ 4 bpm @ 260 psi follow w/ 10 bbls of clean sea water to clear lines and surface. 23:00 23:30 0.50 6,839 6,849 COMPZ RPCOM HOSO P Land TBG han er w/ Mule shoe 6,849'. RILDS 23:30 00:00 0.50 6,849 6,849 COMPZ RPCOM PRTS P PT TBG Ca~ 3.000 psi for 15 minutes 6/13/2009 Cont' to PT IA to 3,000 psi for 30 min. Shear out SOV. PT SSSV @ 2,000 psi for 15 minutes and chart. Pull LDG Jt. Set TWC. Wash BOP Stack & surface lines. ND BOP, NU Tree. Test Tree and Pack off. Pull TWC. Freeze Protect. Utube. Set 3" HBPV and dress tree. Release Nordic Ri 3 00:00 02:00 2.00 6,849 0 COMPZ RPCOM PRTS P Bleed TBG back to 2,000 psi and PT IA 3 000 si for 30 minutes and chart. - good test. Bleed off IA and TBG to 0 psi. Pressure up to 2,000 psi and shear SOV @ 6,752'. Bleed off and Close SSSV and PT @ 2,000 si for 15 minutes - leaked off found mis aligned valves) Retest SSSV to 2 000 si for 15 minutes - oo test. Bleed off and Open Valve. RD Test equipment and Lay down landing 'oint. 02:00 02:30 0.50 0 0 COMPZ RPCOM MPSP P Set 3" HBPV 02:30 04:30 2.00 0 0 COMPZ RPCOM SVRG P Cut 84' of driil fine and slip 300' on drum for preparation in lay down of ri . 04:30 05:30 1.00 0 0 COMPZ RPCOM OTHR P Unload pits 05:30 12:00 6.50 0 0 COMPZ RPCOM OTHR P Hold PJSM, Wash BOP and circulating lines out w! 75 bbl caustic wash, followed by 75 bbi neutralizer pill, followed by 25 bbl corrosion inhibitor ill, follow b 50 bbl flush. 12:00 15:00 3.00 0 0 COMPZ RPCOM NUND P PJSM. Remove pipe and b~ind rams, clean cavities and a I Mol Mist. 15:00 16:30 1.50 0 0 COMPZ RPCOM NUND P ND BOPE 16:30 18:00 1.50 0 0 COMPZ RPCOM NUND P NU Tree 18:00 19:00 1.00 0 0 COMPZ RPCOM SEQP P PT Packoff @ 250/5,000 psi fro 15 minutes - good test. PT Tree @ 250/5,000 psi fro 15 minutes. - good 19:00) 19:30 I 0.50 I O I 0 ICOMPZIRPCOMIMPSP I P 4 ., ~~~~ Schlumberger -DCS 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Log Description NO. 5228 Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Kuparuk Date BL Color CD 05/12/09 3A-18 AYS4-00069 PERF/SBHP SURVEY 6 04/26/09 1 1 3C-08 B14B-00033 GLS $ = / 04/21/09 1 1 2M-25 6148-00034 GR/TEMP LOG /9 (- 04/22/09 1 1 1R-19A AYS4-00065 SBHP SURVEY -rC " `~ 3~ ~ 04/23/09 1 1 3G-13 AYS4-00067 SBHP SURVEY - ~ 04/24/09 1 1 3G-05 AYS4-00066 SBHP SURVEY 04/24/09 1 1 3F-07 B14B-00038 SBHP SURVEY ~ 04/24/09 1 1 3F-08 B14B-00037 SBHP SURVEY '- 04/24/09 1 1 3M-25A B14B-00040 SBHP SURVEY 04/25/09 1 1 3K-08 6146-00039 SBHP SURVEY -_ C/ 04/25/09 1 1 2N-318A AWJI-00026 MEM BHP SURVEY -d 04/27/09 1 1 2Z-07 B14B-00045 SBHP SURVEY ~ 04/29/09 1 1 2Z-01A B14B-00044 SBHP SURVEY ~~ 4 Q 04/29/09 1 1 3K-102 ANHY-00080 GLS 04/30/09 1 1 2W-06 604C-00036 PRODUCTION PROFILE 05/02/09 1 1 2W-12 B04C-00037 PRODUCTION PROFILE p~ 05/03/09 1 1 C-02 B04C-00045 POWERCUTTER W/SBHP SURVEY" 05/09/09 1 1 1 J-120 B04C-00043 GLS - j Q O 05/08/09 1 1 31-11 604C-00044 SMALL TBG PUNCH W/SBHP 05/08/09 1 1 Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. ~~~ 3C-02 RWO Completion Changes Page 1 of 1 Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) `~~.- i `C~' v Sent: Monday, May 04, 2009 8:04 AM To: 'Long, Jill W Cc: Gober, Howard Subject: RE: 3C-02 RWO Completion Changes Thanks Jill. I will place a copy of this message in the file. Tom Maunder, PE AOGCC __ __ _ _ __ From: Long, Jill W [mailto:Ji11.W.Long@rnnocophillips.com] Sent: Friday, May 01, 2009 3:34 PM To: Maunder, Thomas E (DOA) Cc: Ober, Howard _ Vii. ~. d s ~. ~ ~ ~~ . ~. 2 ~ ~ Subject: 3C-02 RWO Completion Changes Tom- Yesterday we had a procedure review meeting for the upcoming RWO on 3C-02 and some aspects of the final completion were changed. The primary reason for the changes is to have the ability to circulate out the mud prior to rig release rather than circulating it out through the mandrel. The attached schematic is the new, revised completion. «3C-02 Proposed Schematic.pdf» The changes made are as follows: 1 }remove the perforated joints from the completion 2} install a 2.813" X nipple above the S3 packer 3} install a 2.813" XN nipple below the S3 packer 4} RIH with a shear out sub in the bottom Tie voo~¢ cf }!~e procedure rernairs the same, only the above changes to the completion were made. If you - _.L„ ~.:v~.... ..,..~ a ~,.,~3.ui neeas to be submitted with regards to the sundry please let me knot,. ,3i11 ~~r:c~ n~.itg.~~ ~~~ cr:~:~ Weli: 3C-02 API: 500292141400 Qhjjjj~ Field: Kuparuk PTD: 185-188 2009 RWO PROPOSED COMPLETION CURRENT COMPLETfON WELLHEAD Lift threads: 2-7l8" 8rd BPV: 2.5" Type H BPV Profile Model: CIW Gen 4A CONDUCTOR 16", 62.58 ppf, H-40, welded SURFACE CASING 9`/", 36 ppf, J-55, BTC PRODUCTION CASING 7", 26 ppf, J-55, BTC TUBING 2-7/8", 6.5 ppf, J-55, 8rd 7~.~~`~ C-1: 6,991'-7,005' MD 6,179'-6,190' TVD Ate: 7,168'-7,172' MD 6,316'-6,319' TVD A-3: 7,176'-7,212` MD 6,322'-6,349' TVD A-2: 7,231'-7,250' MD 6,364'-6,378' TVD NEW COMPLETION N~i~i Tubing: 3'/Z", 9.3#, L-80, EUE 8rd Mod A: SCSSV: 2.813" X Nipple Profile @ 2,000' TVD= 2,000` MD B: Gas Lift Mandrel C: 2.813" X Nipple D D: S3 Baker Packer G E: Seal Assembty F: 2.813" XN Nipple (w/ 2.75" no go) '"`KOP for CTD=70ti0' MD G: F-1 Baker Packer H: Seal Assembly 1: Solid nose shear out sub Last Tag: 11!07108 Tag Depth: 7,253' RKB Fill: no fill (3' of rathote) TD: 7,635' RKB Last Updated: 30-Apr-09 Updated by: JWL • ii >~--, - ~l ~J t~ I ~, ~ r __ .~ ~..1 a~ ~ t_~ ~__-~ ~ ..~ ~a, 7.~ AI,A5SA OIL A1~TD GrAS CO1~T5ER`PATIOi~T COMDII551O1~T Jill Long Wells Engineer ConocoPhillips Alaska Inc. PO Box 100360 Anchorage AK 99510-0360 • SARAH PALlN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 ~~5 ,fig Re: Kuparuk River Field, Kuparuk River Oil Pool, 3C-02 Sundry Number: 309-153 '~±~~y) ~~~t~j, ~U~~i ~.~ Dear Ms. Long: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (90~ 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. Chair c ~~~. DATED this day of April, 2009 Encl. ~a~ oq ~~' ~$ : ~ ~ ~`~ E~CE1~~~ ~~ti STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ~'~ APF~ ~ 4 ~Q~~ APPLICATION FOR SUNDRY APPROV ~}~ ~~ka Oi! & Gas Cons, Cummissiar 20 AAC 25.280 1. Type of Request: Abandon ^ Suspend ^ Operational Shutdown ^ Perforate ^ Waiver Other Alter casing ^ Repair well ^ Plug Pertorations ^ Stimulate ^ Time Extension ^ C '~~ ` Change approved program ^ Pull Tubin ~ g ^ ' Pertorate New Pool ^ S` ~ Re-enter Suspended Well ^ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConocoPhillips Alaska, InC. Development ^ Exploratory ^ 185-188 3. Address:. Stratigraphic ^ Service /^ 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 50-029-21414-00 ` 7. If perforating, closest approach in pool(s) opened by this operation to nearest property line 8. Well Name and Number.. where ownership or landownership changes: Spacing Exception Requires? YeS ^ NO Q 3C-02 9. Property Designation: 10. KB Elevation (ft): 11, Field/Pool(s): ADL 25634 ~ RKB 84' Kuparuk River Field /Kuparuk River Oil Pool 12• PRESENT WELL CONDITION SUMMARY Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): _ . Plugs.. (measured):.. Junk (measured): 7635' • 6669' 7514' 6577 Casing. Length Size MD TVD Burst Collapse CONDUCTOR 110' 16" 110' 110'. SURFACE 3861' 9-5/8" 3861' 3735' PRODUCTION 7635' _ 7~~ 7635' 5669', Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size:. Tubing Grade: Tubing MD (ft): 6991'-7005', 7168'-7172', 7176'-7212', 7231'-7250' 6179'-6190', 6316'-6319', 6322'-6350', 6365'-6379' 2-7~8" J-SrJ 7115' Packers and SSSV Type: Packers and SSSV MD (ft) Camco HRP pkr, Otis 'WD' pkr @ 6842', 7087 Camco TRDP-1A-SSA SSSV @ 1815' 13. Attachments: Description Summary of Proposal Q 14. Well Class after proposed work: Detailed Operations Program ^ BOP Sketch ^ Exploratory [~ Development ^ Service 15. Estimated Date for 16. Well Status after proposed work: Commencing Operat May 8, 2009 Oil ^ - Gas ^ Plugged ^ Abandoned ^ 17. Verbal Approval Date: WAG ^ GINJ ^ . WINJ 0 WDSPL ^ Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Jill Long @ 263-4093 Printed Name .1111 _ Title: Wells Engineer Signature 7 1: Phone 263-4093 Date ? ~ ~' Commission Use Only Sundry Number. Conditions of approval: Notify Commission so that a representative may witness ` ~ 53 Plug Integrity ^ BOP Test. ~ .Mechanical Integrity Test ^ Location Clearance ^ `~~"~~\~L~ ~`" Other: 3 sov ~ Std ~"\~ +^~ '+ti~ "~ rum 1~~~ t (7~~©~ "~S` h1`~'1~~ ~"tV Y"~C~'R"~~~C~~~i~ Subsequent Form Required: ~`~~ ~ ~~ APPROVED BY ~ ~~ Approved by: / COMMISSIONER THE COMMISSION. Date. l I-orm 10-403 Revis.Od 06/2006 r f`"~ ubmit in//Du lic to • ~~~1~~a . s P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 April 24, 2009 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission .333 West 7"' Avenue. Suite 100 Anchorage, Alaska 99501 Dear Commissioner:... ConocoPhillips Alaska, Inc. hereby applies for an Application for Sundry Approval to workover the Kuparuk Well 3C-02 (PTD# 185-188). Well 3C-02 was drilled and completed in 1985 as a 2-7/8"selective single injector. The purpose of this workover is to instaN a 3-1/2".selective single completion to prepare the weH for future coil - tubing drilling. (CTD) work. The new completion will include a SSSV for a downhole lubricator' valve. The CTD rig, CDR2-AC, will sidetrack the well of a later date.. Permits and sundries associated with the CTD work will be submitted separately. Attached to this Application. for Sundry is an outline of the workover and a proposed schematic. This workover is scheduled to take place in May 2009. The CTD work is tentatively scheduled to occur in September 2009. If you have any questions or require any further information, please. contact meat 263-4093. .Sincerely, ~..- ~~~ / Jill W; ong Wells Engineer ~ CPAI Drilling and Wells . • • Well: 3C-02 API: 500292141400 I~~S .Field: Kuparuk PTD: 185-188 ' 2009 RWO PROPOSED COMPLETION CURRENT NEW COMPLETION COMPLETION A WELLHEAD Lift threads: 2-7/8" 8rd New Tubing: BPV: 2.5" Type H BPV Profile 3'/z", 9.3#, L-80, EUE 8rd Mod Model: CIW Gen 4A A: SCSSV: 2.813" X Nipple Profile CONDUCTOR @ 2,000' TVD= 2,000'. MD 16", 62.58 ppf, H-40, welded B B: Gas Lift Mandrel SURFACE CASING. - `c C: S3 Baker Packer. 9s/s", 36 ppf, J-55, BTC E D: PBR Assembly _PRODUCTION CASING E: 2.813" X Nipple 7", 26 ppf, J-55; BTC F, F: Joint for setting whipstock (KOP for CTD=7060' MD) TUBING 2-7/8", 6.5 ppf, J-55, 8rd G: F-1 Baker Packer. PERFS C-1`. 6,991'-7,005' MD ~ 6,179'-6,190' TVD H: Wireline entry guide H A-4: 7,168'-7,172' MD :6,316'-6,319` TVD Last Tag: 11 /07/08 A-3:.7,176'-7,212' MD Tag Depth: 7,253' RKB 6,322'-6,349' TVD ' Fill: no fill (3' of rathole) A-2: ..7,231'-7,250' MD ° TD: 7,635' RKB 6,364'-6,378' TVD Last Updated: 14-Apr-09` I Updated by: JWL K~ aruk 3C-02 In'ector Workov~ P 1 Upsize Tubing and Prepare for CTD Pre-Ris>I Work 1. Apply for Sundry approval 2. Lockout SCSSV 3. Dump sand plug over the A sands 4. Pull dummy valve from GLM #6 and #9. 5. Make chemical cuts 6. Set BPV 7. Prepare location for arrival of Workover Rig General Workover Procedure 1. Verify Sundry approval has been acquired 2. MIRU Nordic 3. Kill Well. 3. ND Wellhead. NU and test BOP to 250/3,850 psi and the annular to 250/3,500 psi. (The East C only SBHP measurement was 4,279 psi on 4R/09 at 6,698' MD. The last A only SBHP was 4,569 psi on 4/7/09 at 7,107' MD. The estimated kill weight needed at this time is 13.9 ppg (14.3 ppg with 125 psi overbalance). The maximum surface pressure observed during well service activities over the past year in which both sands were open was 2,850 psi. The well was shut-in on April 17 in an attempt to depressure the well prior to rig arrival.) 4. Pull and lay down 2-7/8" J-55 to chemical cut above OEJ 5. RIH with fishing BHA #1 on drillpipe. Circulate down overfish and latch up. POOH with OEJ barrel. 6. RIH with fishing BHA #2 on drillpipe and recover the slick stick and HRP Packer. POOH with slick stick and packer. 7. RIH with fishing BHA #3 on driUpipe. Circulate down over blast rings. Engage stub. POOH. 8. RIH with fishing BHA #4 and retrieve the remainder of the completion down to the seal assembly. Pull seal assembly free and POOH. 9. RIH with fishing BHA #5 to retrieve packer. Mill over packer and POOH with packer and tailpipe. Stand bade DP. 10. RU eline and perform a gauge run. Then RtH with F-1 packer and tailpipe assembly on eline. Correlate the depth and set the packer. RD eline. 11. RIH with the new 3-1/2" selective completion and S-3 packer on DP. Locate sealbore, space out, load corrosion inhibitor between packers, and set upper S-3 packer. Confirm the packer set. POOH laying down DP. 12. Begin RIH with the new 3-1/2" upper completion. 13. When it comes to the point of the SCSSV, RU a storm packer and RIH and set at 200' with completion hanging below. Change out the casing packoffs. Release the storm packer and POOH. Then continue on with running the SCSSV and remaining upper completion. 14. Locate the SBE. Space out as needed, load well with corrosion inhibitor, and land tubing hanger. 15. Pressure test tubing and {A. Shear SOV. 16. ND BOP. NU and pressure test wellhead. 17. Freeze protect weB. 18. RDMO Nordic 3. Post-Rio Work 1. Pull BPV and SOV. Install dummy valve. 2. Pressure test tubing to 3,000 psi 3. Pull ball and rod and RHC plug body 4. FCO the sand plug over the A sands 5. Tum over to production engineer. + ~ KUP ! 3C-02 ClonocoPh~l6 5 ~ Well Attributes _ Max Angle & MD STD _ ~Wellbore APIN WI Fieltl Name Well Status Protl/1nJ Type Intl (°I IMD (ftKB) ACi Btm (RKB) Q:d1lc`I "' _ / ~ 500292141400 KUPARUK RIVER UNIT INJ SWI 42.80 4,000.00 7.635.0 - Comment H25 (ppm) Date IAnnotation End Date KB-Grd (fl) Rig Release Dal ' _ SSSV: TRDP 0 7/1/2008 (Last WO' I 36.59 1 9/17/1985 _ eY C_Qnfl'g., 3G02,.122f20092 $t 38".I End Date _____ Stltem4tic Actual ',A notation Deplh (KKB) End Date Annotation ~- ~ Last Tao: SLM 7.237.0 1177/2008 Rev Reason: PULL PLUG/GAUGES, GLV C/O 4/222009 Sabty Valve, ,.es Tubin Strin s ~ ' ' -~ - --- g g I String OD String ID Set Depth Set Depth (NDj I Siring Wl String Tubing D escri ption (in) (inl Top (kK6) (ftK6) (ftK6) (Ibs/ft) Grade String TOp Thrd _' TUBING 27/8 2441 0.0 1,115.0 6,275.3,. 6.SO1J-55 SRD __-- _ - GASLIFT, _-_ 2,251 _ Other In Hole (A ' ll Jewelry: Tubi ng Run 8 Retrievable, Fish, etc.) Top Depth I SURFACE ' Top (kK6) (TVD) Top Intl (%KB) (°) Description Comment _ Run Date ID (ini , asst 1,815 _ 1,814.9 0.32~Safery Valve Camco'iRDP-IA-SSA' 10/16/1985 2.312 1 2,251 2,250.9 0.91 GAS LIFT CAMCO/KBMG/ilDMY18K/// Comment STA 1 10/16/1985 2.347 tans uFT, -_ - ~ 3,984 3,825.1 I 42.76iGAS LIFT CAMCO/KBMG/1IDMY/BKI// Comment: STA 2 10/16/1985 2.347 3.964 GAS UFT 3845' CAMCO/KBMG/1/DMY/BK///Comment: STA3 10116/1985 2347 5,260 4,807.8 I - _ - _._ , 5,995 5,389.9 37.46 GAS LIFT CAMCO/KBMG/1IDMY/BK//l Comment STA4 10/16/1985 2.347 6402 5,715.1 1 3762I GAS LIFT CAMCOIKBMGl1/DMY/BW//Comment: STA6 10/16/1985 2.347 GAS UFT, 5,26o _ 6.777 1 6,011.1 38.13'I GAS LIFT MMH/2 718 X 1.5/1.5/DMY/RK///Comment STA 6 - 10/23/1985 2.347 i 6,825 6,0484 , 37.38~ PBR Camco'OEJ'PBR 10/16/1985 2.812 ' 6,842 6,062.0 37.52 PACKER Camco'HRP' PACKER 10/16/1985 2.867 GAS LIFT. 5 995 ~ i. 6,881 6,093.0 37.84 1NJECTION 1' CAMCO/KBMG/1/DMY/BEK///CommenC STA7 4/7/2009 2.347 . i 6,949 6,146.4 3841 INJECTION ICAMCOlKBMGl1/DMY/BEK/1/Comment: STA8 4/32009 2.347 7,050 6,225.011 39.20 INJECT ION CAMCO/KBMG/1/DMY/BEK//I Comment STA 9 4/7/2009 2.347 7,087 6,263.51 39.50 PACKER ~Otis'WD'PACKER 10/16/1986 4.000 GAS LIFT. 6 noz - 7,107 6,269 2 39.66 NIPPLE Camco'D' Nipple NO GO 10/16/1985 2.250 ? 7.115 6,275.3 39.72 ,,SOS ICamco - 10/16/1985 2.441 . I 7.115 6,275.3 39. 72 ~TTL 10/16/1985 2441 GAS LIFT, bTn IPerfora tions 8 Slots - -- f - ~ - snot I Top (RKB) Bhn (ftK6) Top (TVDI Btm (TVD) (kKB) (ttKB) Dens lone Data (sh-' Type _ Comment - _ -- - 991 6 005 7 179.3 6,189.8 6 C-1, UNIT B, 10/15/19851 12.OIPERF 5" HJ II Csg Gun, 120 deg. phasing PBR. 6.e25 , , , 3C-02 7,168 7,172 6,315 9 6,319.O, - - A-0, 3C-02 10/15/19851 4.0 IPERF 4" HJ II Csg Gun, 90 tleg phasing _- 7,176 7,212 - 6 322.1 6,3503 A-3, 3C-02 10!15/1985, 4 0 IPERF 4" HJ II Csg Gun, 90 deg phasing a -v ~ -.. 7.231 _._-. 7,250 -- _-_ 6,364.5 6,378.6 A-2, 3C-02 10/15/1985 4.0 IPERF 4"HJ II Csg Gun, 90 deg phasing PACKER s.e4z _, _~ -_- INJECTION. _ t?. 6,861 INJECTION. _ III 6,949 I IPERF. - 6,991-1,005 i INJECTION, -- 7,050 PACKER. ],OB] - "1 NIPPLE. 7.107 SOS, ],115 ~ t_ I ~, TTL. ].115 IPERF. 7. ~68~].1 ]2 IPERF. _ 7.1)6].2'2 '. IPERF. 7.231-],250 PRODUCTION. ],635 TD, ],635 -; + ~/ 1 1 i ~ / ._..._.. 1/ ~ ~~ ~ ~~rE11~1~~G~~s~ NO. 5005 Schlumberger -DCS 2525 Gambell Street, Suite 400 Company: Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 ATTN: Beth ,_ r~~.L;~[~ :~ ~~~~:, '~ /p~~~: Attn: Christine Mahnken - 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Kuparuk Well Job # Log Description Date BL Color CD 12/17/08 2X-10 11978476 PRODUCTION PROFILE ~ - ~ • 08/17/08 1 1 2V-09 12100460 PRODUCTION PROFILE (p 11/16/08 1 1 1Y-06A 12100461 PRODUCTION PROFILE 11/17/08 1 1 2X-12A 12100464 PRODUCTION PROFILE G} '^- 11/21/08 1 1 2U-08 12096574 PRODUCTION PROFILE - 11/28/08 1 1 3K-108 12100466 USIT 11/23/08 1 1 3K-30 12097433 LDL .- / 11/28/08 1 1 30-01 12097434 LDL -Q 11/29/08 1 1 1E-04 12097436 LDL '1' 11/30/08 1 1 3A-04 12097432 INJECTION PROFILE L - 11/27/08 1 1 1 H-16 12096581 PRODUCTION PROFILE ~ 12/05/08 1 1 3A-06 12114994 BAKER LOWER STRADDLE PACKER 11/26/08 1 1 2U-14 12096578 INJECTION PROFILE C - 12/02/08 1 1 1G-06 12096580 INJECTION PROFILE 12/04/08 1 1 2V-10 12096582 PRODUCTION PROFILE 12/06/08 1 1 3F-01 12086694 PRODUCTION PROFILE 12/07/08 1 1 2W-14 12086695 INJECTION PROFILE 12/08/08 1 1 1J-102 12086701 INJECTION PROFILE 12/14/08 1 1 1 D-07 12114999 USIT _ ~ 12/15/08 1 1 3C-02 12114997 INJECTION PROFILE ~ 12/13/08 1 1 2T-18 12086703 INJECTION PROFILE 12/17/08 1 1 i i Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. MEMORANDUM ) ) State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg Kr1óa lit !3Io'{' P.I. Supervisor ¡ ~ II DATE: Tuesday, September 13,2005 SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC 3C-02 KUPARUK RIV UNIT 3C-02 ~ \ r¡fb \qþ FROM: Jeff Jones Petroleum Inspector Src: Inspector Reviewed By,;... P.I. Suprv-5J12- Comm NON-CONFIDENTIAL Well Name: KUPARUK RIV UNIT 3C-02 Insp Num: mitJJ050909112659 Rei Insp Num API Well Number 50-029-21414-00-00 Permit Number: 185-188-0 Inspector Name: Jeff Jones Inspection Date: 8/30/2005 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well II -3_C-02 -lType Inj. Iwl TVD 1---6062'IA I 1000 135ïõ- I 3390 II 3360 I ¡ P.T. I 1851880 ITypeTest I SPT Test psi 11515:5 I OA I Iwil7õ- i . 170 ~ 170 -l-----i------- _Inter~al 4YRTST P~ P jUbingl_ 2850_! 2850_~-t~850 -- 2850 _r----r=-~__ Notes 2_6 BBLS diesel pumped. 1 well house inspected; no exceptions noted. '-' -, á . "';" ~'J:i\R ¡¡;~ 0 \~ \':/' ,/1 "ð ,1 í¡L\or.", ;~::I 0 2.005 Tuesday, September 13,2005 Page 1 of 1 MEMORANDUM State of Alaska TO: Julie Heusser '--~'~'~' '~1°\ Chairman ~\~ DATE: July 15, 2001 \ SUBJECT: Mechanical Integrity Tests THRU: Tom Maunder ~"'~.~ Phillips P.I. Supervisor/~,/'' _'~"~ ~ ~ 3C'Pad I~C~o ~ KRU FROM: Chuck Scheve Kuparuk Petroleum Inspector NON- CONFIDENTIAL Alaska Oil and Gas Conservation Commission .... Wad P:T.D. ' W..e,,[ P.T.D.I w~, p.T.D.I Notes: P.T.D. Notes: W~, P-'I-.D. w~ll P..TiD- Notes: Packer Depth Pretest Initial 15 Min. 30 Min. 3c-02 I Type'nj.I S I'T-V.D;I ~ I Tub~.gi 32~01 325~1 32~0"1 32S0 i~.~1 4 ~~ IT~.et~l ,~ ' ITe~."S~l ~S~S"'! 'Ca=~'l ~350 I '2~80 i 2~0 .I 2,~ I. P/F I,_P ' 'si~' i"ru'~".l :~"i :"~1 :~'~ '1 :~' l' e'va'l" '~85-'~54,Typet~.l," P' I.T~t'.P."I, ',5~2' I Ca~.,:j! 1~'00 I :'Or:'O I ~0"0 I,~2~ i ,P/F I"_P ! 3c-07 I Type,nj.I'" N I T.V.D. I S2~2 I'rub~,gl 17.r,b'l' ~7501 "7~1 ',7SO I,nte~li 4 I I :~c-o~ I'"¥,~'nJ-I S. I T..V.O.I.~2~. i'Tu~l ~50 I 2~0 I ~'! 20,5O I',t,,~"l''4 185-1oo ITypetestl P ITeStps!.i 1573 .I..ca~.gl ,~oo"'l-2160 I '215° l'i21~' ['-P/F ! -P ' ~-~ IT~e'"~'l' ~ I TM I' ~ '1 Tua~JI 3ooo' i, ~oo i ~,~oo ! ~o~' II.te~ai'! 4 1~5-0~ I,Type,t~l ,.P. , IT~psi! ~s~o4 l Cas~,n, 01 4go'! 2050 ! 2°~°'1 2000' I' p~F I_P, 3c-~4 ITypeinj. l s" IT, v,u. I 6316 I Tua'ngJ 3ooo i'll 3o0o1 3ooo l,nt~,~l 4 '~5-199 J.TypetestJ .P JT~Psi. J ~579 ICa~ng..J 'l~::~O l'2~ i .~..~ I 2~5'l 'P~F"J E Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS INJ. S = SALT WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Interval I= Initial Test 4= Four Year Cycle V= Required by Vadance W= Test dur'mg Workover O= Other (describe in notes) Test's Details I traveled to 3C Pad in the Kuparuk River Field and witnessed the 4 year Mechanical Integrity Test on 6 injection wells. The pretest pressures were observed and found to be stable. The standard annulus pressure tests were then performed with all 6 wells demonstrating good mechanical integrity. M.I.T.'s performed: _6 Attachments: Number of Failures: _0. Total Time during tests: c,c: MIT report form 5/12/00 L.G. MIT KRU 3C Pad 7-15-01 CS.xls 8/8/01 ^'""ko Oil Gas Conser,,ation Commission Juu I ~orcupine Drive Anchorage, Alaska §§fifll-3192 Permit # ~--~--- [~' The folio.wing data is hereby ackno.wiedged as being received: ,O~scrip~ion .~eceJved by~ Dated: C~_py sent to sender: Yes~ No., X / ATTACIIMENT 1 PAGE 3 KUPARUK RIVER FIELD CONSERVATION ORDER 198 RULE 4 - INJECTIVITY PROFILES SECOND QUARTER 1987 SUBMITTAL WELL APl NUMBER NUMBER 50-029 "~"~3B-01 J 21318 '"'"'-33 B- 07~''''' 21337 '"""~ 3 B- 12~'''' 21370 3C-02 21414 "'"'~ 3F-03 ~ 214h8 3J-Oh 21h00 "'"~3 J - 05~'/' 21436 'x"" 3J-08 ~ 21439 3J-13 211-195 3J-16 21498 /.:-/; //-- DATE OF DATE OF DATA TYPE REASON FOR INITIAL PROFILE/ PROFILE/ PROFILE/ INJECTION SURVEY SURVEY SURVEY WELL COMPLETION 01/23/87 05/23/87 SPINNER INITIAL A&C SS 01/23/87 05/22/87 SPINNER INITIAL A&C SS 01/24/87 05/21/87 SPINNER INITIAL A&C SS 01/09/86 06/22/87 SURVEY FOLLOWUP A&C SS 05/24/87 04/01/87 05/28/87 05/28/87 03/01/87 03/31/87 SPINNER SURVEY SPINNER SPINNER SURVEY SURVEY INITIAL INITIAL INITIAL NITIAL NITIAL NITIAL 01/21/87 05/21/87 02/02/87 02/02/87 02/02/87 02/02/87 A&C SS A S A&C SS A&C SS A S A S ZONES TAKING WATER A&C A&C A&C A&C A&C A A&C A&C A A I NJ ECT I ON BWPD 2530 A SAND 1240 C SAND 1927 932 1072 RECEIVED " 3.9!.!7 Gas Cons. Oommjssio~ Anchcr~,~9 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COI~TMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL E3X OTHER [] 2. Name of Operator 7. Permit No. ARCO ALASKA, INC. 85-188 3. Address 8. APl Number P. O. BOX 100360, ANCHORAGE, ALASKA 99510 50- 029-21 414 9, Unit or Lease Name KUPARUK RIVER LINIT 4. Location of Well SURFACE I_OCATION. 537'FNL, 1378L, Sec. 14, T1 2 N, R9 E, 5. Elevation in feet (indicate KB, DF, etc.) RKB 84 PAD 47' ! I 6 . Lease Designation and Serial No. ADL 25634 ALK 2562 12. 10. Well Number 3C-2 11. Field and Pool KUPARUK RIVER FI ELD KUPARUK RIVER OIL POOL Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other E~ Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10~407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estirnated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). On December 30, 1985 Kuparuk well 3C-2 was converted from a producer to a water injector well as part of the full field waterflood conversion effort. Water is being injected into both the "A" and "C" sands. 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed J ~-~-'~ L~/z~-~-''z¢'/''''~ Title KUPARt IK Date The space below for Commission use OPERAT ! ONS COORD ! NATOR Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date 1/23/86 Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office B 00360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 January 24, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Attached in duplicate are subsequent notices following wells at the Kuparuk River Field' Well Action Date Performed on the 2V-1 Conversion 12/18/85 2V-4 Conversion 12/19/85 2V-5 Conversion 12/19/85 2V-6 Conversion 12/19/85 2V-8 Conversion 12/18/85 3B-2 Conversion 12/29/85 3B-5 Conversion 12/29/85 3B-10 Conversion 12/29/85 3B-16 Conversion 12/29/85 3C-2 Conversion 12/30/85 3C-5 Conversion 12/30/85 3C-7 Conversion 12/30/85 3C-12 Conversion 12/30/85 If you have any questions, please T. M. Drurnm Kuparuk Operations Coordinator TMD / kmc Attachment (Duplicate) call me at 263-4212. RECE X/ED 3AN 2 7 ARCO Alaska. Inc. is a Subsidiary of AllanticRichfieldCompany STATE OF ALASKA ALASKA C r-- AND GAS CONSERVATION CO ..... .,IlSSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL I~X GAS [] SUSPENDED [] ABANDONED [] SERVICE [] ._ 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 85-188 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21414 4. Location of well at surface 9.. Unit or Lease Name 537' FNL, 1378' FEL, Sec.14, T12N, RgE, UM Kupaurk River Unit At Top Producing Interval 10. Well Number 1326' FNL, 1648' FWL, Sec.14, T12N, R9E, UM 3C-2 At Total Depth 11. Field and Pool 1482' FNL, 1206' FWL, Sec.14, T12N, R9E, UM Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Kuparuk River 0i ] Pool 84' RKBI ADL 25634 ALK 2562 , 12. Date Spudde'd09/08/85 13. Date T.D. Reached09/14/85 14' Date C°mp" Susp' °r Aband' I 15' Water Depth' if °ffsh°re 116' N°' °f C°mpleti°ns09/1 6/85* N/A feet MSL 1 17. Total Depth (MD+TVD) 18. Plug Back Depth(MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 7635'MD,6669'TVD 7514'MD,6577'TVD YES PAX NO [] 1815 feetMDI 1700' (approx) 22. Type Electric or Other Logs Run FDC/CNL, D IL/SP/SFL/GR/Cal, CET, GCT 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# H-40 Surf 110' 24" 186 sx CS II 9-5/8" 36.0# J-55 Surf 3861' 12-1/4" 1000 sx PF "E" & 350 sx PF "C" 7" 26.0# J-55 Surf 7606' 8-1/2" 600 sx Class "G" & 250 ix PF "C" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 7231' - 7250' 2-7/8" 7115' 6842' & 7087' 7212' - 7176' w/4 spf, 90° phasing 7168' - 7142' 26. ACID, FRACTURE, CEMENTSOUEEzE,ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 6991' - 7005' w/12 spf, 120° phasing See attached Addendum, dated 12/11/85~ for frac data. 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I " Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATED.A~ OIL-BBL GAS-MCF WATER-BBL :OI L GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA , Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NONE Form 10-407 * NOTE: Tubing was run and well was perforated 10/16/85. GRU12/WC13 Submit induplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOGICMARKEF~s .~ .... : t-:.'"..?~:, i::....:.:::-':..~:;' :-:!:i:.FORMAT(ON_~F'i~S.iLS.;: ,., .... , . : NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Kuparuk C 6909~ 6118~ N/A Base Kuparuk C 700~~ 6189~ Top Kuparuk A 7156' 6306' Base Kuparuk A 7322' 6432' 31. LISTOF ATTACHMENTS Addendum 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~~ .~~ Title Associ ate Engi neet Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where-not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO Alaska, Inc. Post Office BOx 100360 AnchOrage, Alaska 99510-0360 Telephone 907 276 1215 January 3, 1986 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Well Completion Reports Dear Mr. Chatterton' Enclosed are Well Completion Reports for the following wells' 3C-1 3C-2 3C-3 If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU13/L03 Enclosures ARCO Alaska, Inc. is a Subsidiary of AtlanticRich[ieldCompany ADDENDUM WELL: 11/04/85 3C-2 Frac well w/223 bbls diesel, 1008# 100 mesh & 9727# 20/40 sand @ avg rate of 17 BPM, 4900 psi. Drilling~Superint endent ' Df~te ARCO Alaska, Inc. !,o, st ()ffice Box' 100360 Anchorage, Alaska 99510-0360 i'elo!~ho~m. :)r~7 276 12i5 December 4, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 3C-2 Dear Mr. Chatterton: Enclosed are the Well Completion Report and gyroscopic survey for 3C-2. If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU12/L106 Enclosures RECEIVED Alaska Oil & Gas Cons, Commission Anchorago ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA (..~ . AND GAS CONSERVATION CO~_~llSSlON WELL COMPLETION OR RECOMPLETION REPORT AND LOG .,, 1. Status of Well Classification of Service Well OIL [~XX GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 85-188 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21414 4. Location of well at surface T[b~-i'~x[~I' 9. Unit or Lease Name At Top Producing Interval j~ufi. ~/____l 10. Well Number 1326' FNL, 1648' FWL, Sec.14, T12N, R9E, UH~" ~-i 3C-2 lB. H.~ At Total Depth ~ 11. Field and Pool 1482' FNL, 1206' FWL, Sec.14~ T12N, R9E, UH Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.)16.Lease Designation and Serial No. Kuparuk River 0i 1 Pool 84' RKBI ADL 25634 ALK 2562 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. 115-Water Depth, if offshore 116. No. of Completions 09/08/85 09/1 4/85 09/1 6/85*I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18. Plug Back Depth(MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 7635'MD,6669'TVD 7514'ND,6577'TVD YES [~X NO [] 1815 feet MDI 1700' (approx) 22. Type Electric or Other Logs Run FDC/CNL, D IL/SP/SFL/GR/Cal, CET, GCT 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# H-40 Surf 110' 24" 186 sx CS II 9-5/8" 36.0# J-55 Surf 3861' 12-1/4" 1000 sx PF "E" & 350 sx PF "C" -, 7" 26.0# J-55 Surf 7606' 8-1/2" 600 sx Class "G" & 250 ~,x PF "C" · 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 7231' - 7250' 2-7/8" 7115' 6842' & 7087' 7212' - 7176' W/4 spf, 90° phasing 7168' - 7142' 26. ACID, FRACTURE, CEMENTSOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 6991' - 7005' w/12 spf, 120~ phasing N/A 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD II~ ~Flow Tubing Casing Pressure CALCULATED OI L-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~ 28. CORE DATA · Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NONE R CEIVED . Anchorage Form 10-407 * NOTE: Tubing was run and wel 1 was perforated 10/16/85. TEMP2/WC71 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE _. . NAME Include interval tested, pressure data, all fluids recovered and gravitY, MEAS. DEPTH TRUE VERT. DEPTH GOR, and. time of each phase. Top Kuparuk C 6909' 6114' N/A Base Kuparuk C 7004' 6189' Top Kuparuk A 7156' 6306' Base Kuparuk A 7322' 6432' I I 31. LIST OF ATTACHMENTS Well History (comDl~l;ion details). Gyroscopic Survey ~2 copies) 32. I hereby certify that the foregoing is true and correct tO the best of my knowledge ~ ~ .~~/~, Title As$°ciate Engineer Date Signed INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas-injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 ARCO Oil and Gas Company aily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. I Accounting cost center code District ICounty or Parish State Alaska I North Slope Borough Alaska ' Kuparuk River ADL 25634 3C-2 Auth, or W.O. no. JTitle AFE 604828 I Completion Roll'N 4 Operator ARCO Alaska, Inc. Spudded or W.O. begun A.R.Co. Date Pate and depth as of 8:00 a.m. Complete record for each day reported Old TD Released rig 1800 hrs. 10/15/85 API 50-029-21414 W.I. rrotal number of wells (active or inactive) on this Icost center prior to plugging and I 56,24% Jabandonment of this well I IHour I Prior status if a W.O. 10/15/85 ! 0100 hrs. I 10/16/85 7" @ 7606' 7514' PBTD, RU to perf 10.2 ppg NaC1/NaBr Accept rig @ 0100 hrs, 10/15/85. perf. NU & tst BOPE. RU Schl to 7" @ 7606' 7514' PBTD, Prep to set pkr 10.2 ppg NaC1/NaBr RU'Schl, perf w/4" guns, 4 SPF 90° phasing f/7231'-7250', 7168'-7172', 7176'-7212'. Perf w/5" guns, 12 SPF, 120° phasing f/6991'-7005'. RIH w/6.125" gauge ring & JB to 7100'. RIH w/WD pkr, set @ 7084' WLM. RD Schl. RU & rn 225 jts, 2-7/8", 8RD, J-55, 6.5#, EUE IPC compl string & lnd w/tail @ 7115', "D" Nipple @ 7107', SSSV @ 1815' & pkrs @ 6842' & 7087'. 10/17/85 Classifications (oil, gas, etc.) Oil Producing method 7" @ 7606' 7514' PBTD, 7635' TD, RR Diesel Set pkr, shear pins in OEJ. ND BOPE, NU & tst tree; OK. Displ well to diesel. Shear pins in shear ~t~sj~bm~set BPV. 7635' TD 10/16/85 New TO Date Flowing Ala.k~ PB Depth , '-~5 ~O/~S. ~- Kind of rig Rotary Type completion (single, dual etc.} Single Official rese~ofr name(s) Kuparuk Sands Potential test data Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct Signatu re I Date I Title For form preparation and di[tribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. Drilling Superintendent ARCO Alaska, Inc. Post Office Bc )0360 Anchorage, Alas~ka 99510-0360 Telephone 907 276 1215 December 9, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Attached are our notices of intention to field wells 3B-2, 3B-5, 3B-10, 3B-16, 3C-2, 3C-12 to water injection wells. If you have any questions, please call me at convert Kuparuk 3C-5, 3C-7, and 263-4212. T. Mark Drumm Kuparuk Operations TMD.ps. Fi le Attachment (In Triplicate) Coordinator a/asia 0i/ '~nc,5or~gs' Commission ARCO Alaska, Inc. is a Subsidiary of AllanticRichfieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COi~IMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL I-1~, OTHER [] 2. Name of Operator 7. Permit No. ARCO ALASKA, INC. 85-18R 3. Address 8. APl Number P. O. BOX 100360, ANCHORAGE, ALASKA 99510 50- 029-21414 4. LocaZiorLof Well SURFACE LOCATION. 537'FNL, 1378L, Sec. 14, T12N, R9E, libra 5. Elevation in feet (indicate KB, DF, etc.) RKB 84, PAD 47' 6. Lease Designation and Serial No. ADL 25634 ALK 2562 9. Unit or Lease Name KUPARUK RIVER UNIT 10. Well Number 3C-2 11. Field and Pool KU PARU K KU PARUK POOL RIVER FI ELD RIVER Ol L 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other E~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). It is proposed that Kuparuk well 3C-2 be converted from a producer to a water injection wel I. The well has produced from both the "A" and "C" sands. Injection wi I I be into both sands also. ANTICIPATED START DATE. January 1, 1986 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~./-/~/,.~_~,/~ ~'-~,,,0,-~-'~.~¢~.._ Title KUPARUK The space below for Commission use OPERAT ! ONS COORD ! NATOR Date 1 ? / 6 / _RS Conditions of Approval, if any: Approved Copy Returned, By Order of Approved by COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate RETURN TO: ARCO Alaska, In( Post Office' Box 100360 Anchorage, Alaska 99510-0360 ._- Telephone 9~7 276 1215 · .~.~ .. :-... - . - : . -. , . . _ ... -.':.-..: ._~ ~_' ~.: -. ARCO ALASKA~ INC. KUPARUK OPERATIONS . RECORDS CLEkK ATO- 1115B P.O. BOX 100360 ANCHORAGE, AK 99510 DATE: 11-19-85 TRANSMITTAL NO: 5452 ENGINEERING TRANSMITTED HEREWITH ARE THE FOLLOWING ITk2dS. PLEASE ACKNOWLEDGE RECEIPT AND RETURN ONE SIGNED COPY OF THIS TRANSMITTAL. FINAL PRINTS/ SCHL/ CET'S/ ONE * OF EACH 1R-4 J09-22-8.5 2A-16 J 09-05-85 2Z-12 j 09-24-~5 3C-2~' 09-30-85 3J-26 09-19-85 RUN #1 6755-8302 RUN #1 8643-9808 RUN #1 7~00-9330 KUN ~1 4750-7440 RUN $1 7647-9338 RECEIPT ACKNOWLEDGED: : BPA~: DRILLING=BL B. CURRIER L. JOHN#CON CHEVRON NOB I L D & b~ NSK CLERiK*~L DiSTKISUTION: w. PASHER hXXON PHILLIPS OIL J. RATHMELL DATE: STATE OF ALASKA*BL SOHIO /SE UNION VAULT/ANO*FILMS ARCO Alaska. inc ~s a Subs~asary of AtlanlicRichfieldComl~any ARCO Alaska, Inc. Post Office E 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 DATE: 11-13-85 TPJ%NSMITTAL NO: 5440' .~U3TURN TO: ARCO ALASKA, INC. KU PARUK OPE P, ATIONS RECORDS. CLERK ATO-1115B P.O. BOX 100360 ANCHORAGE, AK 99510 ENGINEERING 2RANSMITTED RECEIPT AND ?INAL 3C.--2 HEPd--:WITH ARE %'HE FOLLOWING ITi~IS. PLEASE ACKNOWLEDGE RETURN ONE SIGNED COPY ~F THIS TRANSMITTAL. $CHL/ OPEN HOLE/ ON}~ * OF EACH DIL/SFL-GR 09-15-85 RUN '#1 3858-7622 DIL/SFL-GR 09-15-85 RUN 91 3858-7622 DEN/NEU PORO 09-15-85 RUN #1 3858-7596 DEN/NEU PORO 0.9-15-85 RUN ~1 3858-7596 DEN/NEU RAW 09-15-85 RUN 91 3858-7596 DEN/NEU RAW 09-15-85 RUN %1 3858-7596 CYBERLOOK 09-15-85 RUN 91 6750-7550 DIL/SFL-GR 10-18-85 RUN %1 3412-7596 DIL/SFL-GR 10-18-85 RUN 91 3412-7596 DEN/NEU PORO 10-18-85 RUN %1 6900-7570 DEN/NEU PORO 10'18-85 RUN #1. 6900-7570 DEN/NEU RAW 10-18-85 RUN ~1 6900-7570 DEN/NEU RAW 10-18-85 RUN 91 6900-7570 CYBERLOOK 10-'~_ 8-85 R~JN , ~1 6950-7547 PRINTS/ '~2"'-~ "~'2 '%' ~2"-" 3A-6 % ~5" ~ ~2" "~5" ~ ~2" ~ ~5" ~2f~ 3A-5 DIL/SFL 10-11-85 kUN ~1 3972-8648 DIL/SFL 10-11-85 RUN 91 3972-8648 DEN/NEU PORO 10-11-85 RUN 91 7900-8622 DEN/NEU PORO 10-11-85 RUN #1 7900-8622 DEN/NEU 'RAW 10-11-85 RUN #1 7900-8622 DEN/NEU RAW' 10-11-85 RUN #1 7900-8622 CYBERLODK 10-11-85 RUN 91 8100-8550 3A-4 DIL/SFL-GR 09-21-85 RUN DIL/SFL-GR 09-21-85 RUN 91 DEN/NEU POkO 09'-21-85 RUN DEN/.NEU PORO 09-21-85 ~UN DEN/NEU RAW 09-21-85 RUN # 1 DEN/NEU RAW 09-21-85 ~,-'~Y~E RL OOK -'-" 09-22-85 ~ RFr2 LOG ~ 09-21-85 .{ECEIPT ACKNOWLEDGED: ~PAE 3. CURRIER EHEVRON 3 & M*BL DISTRIBUTION: DRILLING*BL W. PASHER L. JOHNSTON EXXON MOBIL PHILLIPS OIL NSK CLERK*BL J. RATHMELL*BL 3852-8461 3852-8461 7000-8436 7000-8436 7000-8436 STATE OF ~ASKA*BL SOHIO /SE UNION 'VAULT/ANO* FILMS ARCO Alaska. Inc. ~s a Subs~cliary of AllanlicRichfieldComparly ARCO Alaska, Inc. Post Office Box '100360 Anchorage, Alaska 99510-{)360 Telephone 907 276 1215 October 23, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' 3C-2 Dear Mr. Chatterton' Enclosed is the Well Completion Report for 3C-2. The bottomhole location, TVDs, geologic markers, and tubing details will be submitted when the gyroscopic survey is run and the well completed. If you have any questions, please call me at 263-4944. Sincerely, d. Gruber Associate Engineer JG/tw GRU12/L26 Enclosure ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA ,._..~ AND GAS CONSERVATION CC .... WllSSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED ~XX ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 85-188 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21414 4. Location of well at surface 9. Unit or Lease Name 537' FNL, 1378' FEL, $ec.14, T12N, R9E, UN (approx) Kupaurk River Unit At Top Producing Interval 10. Well Number To be submitted when gyro is run. 3C-2 At Total Depth 11. Field and Pool To be submitted when gyro is run. Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Kuparuk River 0il Pool 84' RKBI ADL 25634 ALK 2562 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. / 15. Water Depth, if offshore 116-No. of Completions 09/08/85 09/14/85 09/16/85I N/A feet MS LI N/A 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of permafrost 7635'MD 7514'MD YES [] NO I~X N/A feet MDI 1700' (approx) 22. Type Electric or Other Logs Run FDC/CNL, DI L/SP/SFL/GR/CAL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# H-40 Surf 110' 24" 186 sx CS II 9-5/8" 36.0# J-55 Surf 3861' 12-1/l~" 1000 sx PF "E" & 350 sx PF "C" 7" 26.0# J-55 Surf 7606' 8-1/2" 600 sx Class "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) NONE N/A 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A .,, · 27. N/A PRODUCTION TEST Date First Production J Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE GAS-OILRATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATED.k OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE "Ir 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips., NONE /' Form 10-40DRH/WC35 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate ';' "':"~ OL t'~:MAF[I~ERS : ' ...... '~::' ' :'": '~' ' .... _.'. ..:' .' ...... v..-, '~' :-FORM~,TION: ~ ' TEsts" ' - ' NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. .. To be submitted wf In gyro is run. N/A 31. LISTOF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ~~ Associate Engi neet INSTRUCTIONS General' This form is designed for submitting a comPlete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 I JII · I UB. URFACE DIRECTIONAL URVEY F~UIDANCE I~ONTINUOUS [~OOL Company Well Name Field/Location A~,CO ALASKA INCpRPORATED . . - 3C-2 (53,7,' FNL. 1~78' F~z..., s14..T12N. RgE. dM~ _ KUPARUK, NORTH SLOP~.- AT.ARKA . , - Jol~ .Reference No~. 70875 KOZUSKA Oat_...~e 15-OCTOBER- 1985 Computed OGDEN * SCHLUMBeRGeR ~ GCT DZRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKAm INC. 3C-2' KUPARUK NORTH SbOP~,AbA6KA 8UR¥£¥ DATEi O~I,,OCT'B5 ICNOINICERi D,: KQZU6KA METHOD8 Or COMPUTATION TOOb bOCATIC)NI TANGENTIAb- averaqed dev{at~ton and at~t. muth INTERPObATIONI [,INICAR VBRTICAL 8ECTIONi HORIZ,. DZ,ST,~ PROJECTED ONTO k TARGE~ AZIMUTH DF COMPUTATZON DATEI 14-0CT-85 PAGE ARCO A~ASKA, TNC. 3C-2 KUPARUK NORTH ShOPE,ALASKA DATE OF' SURVEyt 01-0¢T-85 KELLY BUSHZNG ELEVATION I ENGZNEER$ D,, KOZUSKA 84,,00 FT XNTERPOLA?£D VALUES FOR EVEN lO0 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VgRT~CAb DOGbEG R£C?ANGUbAR CODRDINATE~ HORZ~.! DEPARTURE DEPTH DEPTH DEPTH DEG HIN DEG HIN FEET DEG/IO0 FEET FEET , . DEG MZN ,o .OOiOO .oo .68 Q,'I! ~ 03 400. 99 ,93 23 ~oo ~ ~'~ "'~ ~ ~ ~ ,,6. · 43 .76 089 096 ' 800.~ 799098 98 64 0,11 ~oo ~ ~: 899 ... ~ E .~ 20 . 31 54 2 64 ,07 0,25 i~oo.oo Io~.~? 200.00 ~.~ i~oo.oo ~=.~.,, ~ ~ I''2~.2, o., [. t~°°'°° I,,~.~~ ]~~ ~ ,~'° '~ ~ ~ I'~.,~ o:,~°' ~ o, '"~ ~' ,~::~ ~o 1900000 1899.91 2ooo.oo ,,,, , o 2,oo.oo =o~ ~ ~''' o ~? 15.89 0 55 2300.00 2 5 88 0 59 ,oo.oo ~ ~ ~ 15.86 1 8 2600.00 2599 81 2515.81' 2 51 oo' o~796 =?x~.~ ~o o 2900:~0 2896:~9 28X2;29 13 19 llgg:go ~o~ o I~o O0 4oo:oo 3 ~9 3500. 0 3~45 . 610 .00 3762 88 2908,88 16 27 98 3O 03.98 19 51 79 79 23 39 18 I~96' 87.~8 26 42 ,42 29 38 3361,38 I 34 59 l~4'5'31 18 26.59 9 34 79 ]60 67~,34 40 40 .79 42 35 S 17 13 E 2.t5 N 83 26 E 1.81 N 70 48 E 0,25 N 67 1 E "1,41 N 68 5! E "3,28 N 77 41E S 88 58 W 04,43 S 72 46 W 18.16 S 76 13 W 38.30 S 77 2 W 63,98 S 70 21W 94.83 S 70 41W '131.98 S 76 17 W 174.67 S 79 34 N 222,33: S ?3 28 ~ 272,15 S 72X~ W 326. $ 7230 N 384.701 S 72 42 N 447,56 S 72 4! ~ 514,30 2, 36 067 014 2: Ol ~ o, 3, ~70 4,39 4,:09 3~96' 3,45 ... 13'78 14.28 ! 3.90 I 28 56 t 92 i 1,8 i 12,45 22. :36,54 .49,62 61,85 ?O-O?,i 02',33 99,26 116,~3 135,52 155,27 430E 5.85 E 59 E 68 E .8° 55 'E .,24 ,54 ,0 426,57 490033 13 14 14 14 14 15, 64 95 . 67 4W S 67 84 69 I 'b ARCO ALASKA, 3C-2 KUPARUK NORTH SLOPE,ALASKA COMPUTATION DATEI 14-0CT-85 TRU£ SUB-SEA COURS£ MEASLIRED VERTICAL VERTTCAb DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG. #TN D£G MTN DATE:_ Or SURVEY! 01-OCT- KEL[,! BUSHTNG EI, EVATToNSI$ PAGE 2 84,00 FT ENGTNEERI Do KOZUSKR INTERPOLATED VALUES FOR EVEN 100 fEET or MEASURED DEPTH SECTION SEVERITY NORTH/SOUTH ~a~/w~oT u,ewd~.' AZZMUT# FEET DEG/iO0 FEET FEET ~,[;T~. DEG MXN 42 649094 4100o00 3909,68 3825,68 35 4200,00 3983,86 3899,86 ~ 42 69 13 89 70 45 88 4500.00 4218,74 4134074 38 18 4600.00 4297.04 42X3 04 38 3~ ~ 965.6! 4700.00 4374.97 4290 97 39 o 69 45 028.25 69 13 ~ 4900.00 4529.4? 4445 47 39 53~ 68 43 X155. 5~0 52O0 5300 54O0 5500 5600 5700 5800 5900 O0 4760 O0 4838 O0 4917 O0 4996 O0 5075 O0 5154 O0 5234 O0 5313 31 4676.31 39 8 32 4754.32 38 13 20 4833,20 37 3 9 53 4912,53 37 32 62 4991,62 37 46 88 5070,88 37 26 42 5150,42 37 89 5229,88 37 42 6000,00 5393,00 5309.00 37 27 6100.00 5472.70 5388.70 36 48 6200.00 5553;03 5469.03 36 26 oo.oo 6400.00 57t2 I 5 28, I 37 33 6500 O0 5791,88 570~.88 37 43 6600 O0 5871,0! 5787.01 37 49 6700 O0 5949,82 5865,82 38 g 6800 O0 6028,37 5944.37 38 8 6900 O0 6107018 6023.18 38 0 ?000.00 6185,b2 6191.62 38 50 ?~00 O0 6263~04 6!79o04 3g 36 200~ 6339.78 6255.78 40 24 400.00 6490,82 6406082 500.00 6566061 6482,61 4.0 7635,00 6668,92 6584 40 43 S 68 15 W $'67 21W 1283'19.10 1219 $ 67 3 W 1346.26 S 67 0 W 1408.59 S 70 46 W 1469.94 ?2 4 . 72 22 W S 72 39 W 1 o S 72 57 W 1835,44 $ ?2 57 w 1955. S 71 12 W 2014,89 S ?0 9 W 2075,75 S 69 28 W 2136,80 S 69 10 W 2197.89 S 69 5 W 2259.38 $ 69 8 W 232~,20 5 69 0 W .238 069 S 68 45 W 2504 W 257t S 2637 14 S 73 14 W 2702 83 S 73 14 W 2768,05 S 73 14 W 2833.27 S 7314 ~ 2856010 176,82 $ 554 23 201,.22$ 618 29 225.58 68O 52 247,02 S 14 267.40 ~;~ 287,87 ~ 856 ~ 308,:76 914 330.27 ~ 973 34 352,4iS 1033 37 375,27 S i092 0 . 422 41 447 .14 472 57 494 45 5i3 48 532 34 ~50 9 6.9 5 587 ~5 o 0 0 32 0 6~ 0 46 1,29 ,43 ,00 0'00 0000 44 $ 70 28 ~ 8 40 W gO 3~,6; ~ ~307,.18 W 2445.,.~ !t 366' [W 2508'44 $ 26 W 2833,84 622,96 ~ 84 !896, ,?,o. 1955,6t 2015.,12 6~8 29 1904,56 721 34 2076, ~ 2198, 743 25 2134, 2259. 2383.~2 ARCO AbASKA, INC, KUPARUK NORTH SLOPE,AbASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTXCAb DEVIATION AZIMUTH COMPUTATION DATEI 14-0CT-85 PAGE 3 DAT~ Or SURV~¥I 01-OCTe85 KgbbY BUSHING EbEVATZONI ENGINEERI De. KOZUSKA INTERPObATED VALUES fOR EVEN 1000 rE~? or MEASURED DEPT SECTION SEVERITY NORTH/SOUTH EAST/NEST .:~.~. AZINU~H FEET DgG/IO0 F~T FEET ' DgG NZN DEPTH DEPTH DEPTH DEG. MIN DEG HIN 0.00 0.00 -84,00 0 0 1000.00 999,97 ~15'97 0 37 2000.00 1999.9t 1 5,91 0 27 3000 O0 2992;88 2908,88 16 27 4000'00 3836,~7 3752:17 42 48 5000:00 4606,16 4522 16 39 5T 6000.00 5393,00 5309 O0 37 27 7000.00 6185,62 6101 62' 38 50 7635.00 6668.92 6584 92 40 43 N 0 0 £ 0,00 $ 40 50 E 1,60 $ 77 2 W 63~98 $ 69 50 W 582,23 $ 68 15 W 1219,19 $ 72 57 N 1835.44 $ 68 45 W 2444,63 $ 73 14 ~ 2856,10 0 O0 0 22 2 36 3 70 0 73 84.00 FT 809,63 $ 945 26 S 2695 ½3 W 856,65 70 COMPUTATION DATEI 14-OCT-B5 PAGE ARCO AbASKA, YNC. DATE.Or SURVE~i 01-0~T-85 KUPARUK NORTH SLOPEtAbASKA ENGINEERI De. KOZUSKA INTERPOLATED VAI, UES fOR EVEN 100 FEeT Or SUB-SEA DEPTH TRUE SUB-SEA COURSE VERTXCAb DOGb£G RECTANGUbAR COORDINATES HORZZ;~ DEPARTUR~ #ERSURED VERTXCAL VERTXCAb DEVXATXON AZXMU?H SECTXON $£VERXT¥ NOR?H/&OUTH EAST/WE$T DX$T,~ A~XNUTH DEPTH DEPTH DEPTH DEG MXN DEG MIN FEET D£G/tO0 ~EET fEET gt,,:~ . DEG MXN . 4 84" O0 rT o.,, ~ o.,= 84,008400 0,00 ~ 2~ i 4954W 0.87 ! 0:,14 0.98 45 :16 1,'10 0.87 08 1,21 0,52 384.01 384 O0 300.00 0 12 0,92 484.01 484 O0 400.00 ~' 2~ 41 28 34 12 ~ ~,98 19 2,~ 584,01 584 O0 500.00 2.66 2.80 684,02 684 O0 600,00 27 3955 29 1,82 884.02 884 O0 800.00 3! 56 2.i6 3.57 '08403 1084.00 1000,000 44 i 2414 ~ ~ i 0,37 o~ 6,37i 0~79 ,~,, o~ ~2,,.oo ,~oo.oo I~ ~.~5 .I:~; 1484 06 1484 00 1400 O0 41 ,,~ o~ ,5,~ oo ,~oo oo o ~, , ,.,4 ~ ,4 ,,.o~ 1884 09 1884 O0 1800 O0 22 52 2! £ 2,.64 ~3.26 1,58 1984 2084 2184 2284 2384 2484 2584 2684 2785 2887 2990 3095 3203 54S 66~ 3794 392~ 406! O9 t ,16 2564 47 2684 42 2784: 382884 75 2984, ~9 3084 50 3184 36 3284 42 3384 56 3484 88 3584 27 3684 67 3784 123884 .00 ,00 2100,00 0 56 N 15 ,00 2200,00 0 58 N 67 li E -i,i4 i 2 O0 2300,00 I 7 N 66 0 2400.00 ~02500.00 2 4 $ 87 §g 2600.00 2700,00 9 31 oo ~oo.oo O0 2900,00 16 12 8 77 29 , 8 70 36 W O0 3000 O0 19 41 O0 3100.0023,47 70 51 193 oo ~=oo..oo ~ ~ !,~ ,, ~ 78 40 35 71 oo~oo.oo ~o ~ O0 35 36 72 364 .00 72 42 O0 3600.00 40 29 o 4453~3 O0 3700,00 42 46 $ 72 12 ~ O0 3800,00 4:2 38 S 68 42 W 626 41 45 35 ,46 33 97 0,9! ~:t~ 0,12 0,86 4,80 4,, 44 .3,52 3, .70 13,67 ll' i' . :"41 06 E !4 56 ,38 ,5' 60 E ! St t;,ge ' 8 1, E 12,22 , '~'~.~ ~, i~:. ~:,~ 6i,12 s 509 , 533 92e61 8 596 N 626 99 & 64 0 ~ 36 cOMPuTATION D~TEI 14-0CT-95 ARCO AbASKA, YNC, 3C'2 KUPARUK NORTH SLDPE,At, ASKA TRUE SUB-SEA COURSE NEASUR£D VERTICAL VERTYCAb DEVYATION AZIMUTH DEPTH DEPTH DEPTH DEG MZN DEG ~ZN DATE OF SURV£¥1 01-0CT-85 KEbbY BUSHING Eb£VATZONI 84.00*PT ENG~NEERI Dp: KOZUAKA INT£RPOLA?£D VALUE8 FOR EVEN ,00 FEET OP SUB-SEA DEPTH VgRT,CAL DOGb£G REC?ANGU~A, COORDXNkTE$ ,ORZZ:,DEPARTUR' . S£CTIO.' SEVERITY NORTH/SOUTH EAST/NZST ~li{ kZINUT. FEET DEG/,O0 FEET FEET ~'t DEG ,IN 4200 4328 64 4084 4455 75 4184 4583 32 4284 471, 63 4384 4840 86 4484 4971 10 4584 510A..37 4684 523 .54 4784 5358.00 4884 3984 O0 3900 O0 40 42 O0 4000 O0 38 9 O0 4100 O0 38 ii O0 4200 O0 38 34 O0 4300 O0 39 3 00 4400.00 39 3! Od 4500,00 39 57 oo4 oo.oo oo ?oo.oo O0 4800;00 37 53 5484.20 4984 O0 4900.00 37 29 5610.60 5084.00 5000.00 37 43 5736.65 5184 O0 5100.00 37 19 5862265284 5988 66 5384 6114 11 5484 5400 6238 48 5584 O0 5500 O0 36 25 6363 79 6490 O4 6616 5684 5784 45 5884 O0 5200 O0 37 27 O0 5300 O0 37 32 O0 O0 36 42 O0 5600 O0 37 34 O0 5700 O0 37 43 O0 5800 O0 37 52 S 6914 N 717,00 S 7046 W 797.58 S 7039 ~ 876.04 S 70 8 N 955.22 $ 69 42 N 1035.57 S 69 2 ~ 1117.35 S 68 28 W 1200.67 $ 67 21 W 1283. 97 S 66 59 W 1365.46 $ 68 48 W 1444.24 S 72 2 W 15 21 51 S ?2 2, . 167S 24 $ 72 44 N 1 0 S 70 13 W 2053.68 S 6932 W 2i3Q.71 S 69 10 N 2207. 97 §:4, 55 ,62 50 18 0.44 0.58 0.27 1,07 0.68 ;77 0 o: 4 78,8! i 830~5 905.1~ ~ 876,0 95,:, 5 21 332,81 980,69 361.66 i1057. 29 ~ 11!7.43 5~ ,,,.,o S 1135,05 1200,6! 12t2,43 1284w~ 455,07 128~,75 ~ 1365,80 485,71 o 1360.60 1444,70 S W ,,o.,, ,,,, ,,: 1652 603~34 1828~85 1904.54 697,57 2013 2130.98 724.93 2065 ~ 70 2208 28 6743.50 5984,00 6870.60 6084,00 6997.93 6184,00 7127.23 6294, 0 7258.29 6384.~0 7391.01 6484.00 7522,95 6584~00 7635.00 6668,92 5900 O0 38 15 6000 O0 3757 6100 O0 38 48 6200 O0 39 4 2 6300 O0 40 54 640O O0 40 42 6500 O0 40 43 6584.92 40 43 8 69 1W 2286 26 $ 69 4 W 2364 62 $ 68 45 W 2443 34 S 68 3i W 2525 i8 S 6857 W 2609 76 $ 72 44 W 2696.9 8 S 73 14 W 2,0783 2 8 93 14 W 2856,t0 1,03 0,00 7 2 94~ 23 5~ W 2525,7 34 o 2543, 2697,65 ~18 26~5. ~ 278~,62 26 8 2695.73 ~ 2856.65 ~6 W 'f ARCO AbASKA, ZNC, 3C-2 KUPARUK NORTH $[.,OPE,ATJASKA ~ARKER TOP KUPARUK C BASE KUPARKUK C TOP KUPARUK A BA~£ KUPARUK A PBTD COHPUTATION DATEI 14-0C?'85 ZNTERPOLA?ED VALUES FOR CHOSEN HORZZON$ BELOW KB PAGE 6 DATE DIP SURVE¥~ 01-0(~T-95 KE:bT~Y BUSHING ICI~EVATZONI 84',00 ENG]:N~CERI D,. KOZUSKA SURFACE GIN=.. 53?' IPNL', 1378' rl~l,,, 8E;C :1'i~' ORI'1LPVD REC?ANGU/,~AIR FROM KB SUB-SEA NORTH/$OU',II'H 6909,00 611~.27 7004,00 6t8 ,74 7156,00 6306.~2 7322.00 6431 97 7635.00 6668, 2 6104 4 810, 51 ~ 62221'12' 845. 2~99° 6~47,97 884'i~~ .41 2S00,43 ~ 6493 '2 9 2, ARCO AbAHKA, TNC, 3C-2 KUPARUK NORTH SLOPE,ALASKA COHPUTATION DATE:'I 14-0CT..85 , DATE OF URVE¥101-OCT-~5 KE~Y BU HING E~EVATION~ 84~00 ~T ENGIN~ERI D, KO~USKA SUMMARY ~$$~~, MARKER TOP KUPARUK C BASE KUPARKUK C TOP KUPARUK A BA&E KUPARUK A PBTD TD HEASUREP DEPTH BELOW KB 6909.00 ?004.00 7156,00 7322,00 7514.00 7635.00 TVD 6114.27 06,12 6431,97 6577,22 B6§8,92 R£C?ANGUb 4~ T ~ N RgE. SUB-SEA · $104,74 6347. rlHAb I~ELb bOCATION ~T TDi TRUE SUB-SEA MEASUREO VERTI~Ab VER~ICAb DEPTH D£PTH DEPTH HORIZON?Ab D~PAR?URE 7635,00 B668,92 6584,92 2856,65 $ 70 40 W SCHLUMBEROER D f REC T 1' ONAL SURVE Y COMPANY ARCO ALASKA INC WELL FIELD KUPARUK COUNTRY USA RUN ONE DATE LOOOEO Oi-OCT-8S REFERENCE 00007087S 71. WELL NAME: 3C-2 SURFACE LOCATION: ~37' FNL, 1378' FIIL, S14, T12N, ~, tiM VERTICAL PROJECTION -SOO 0 0 S~ !OOO ! ~0 ~00 2~00 ~0 PROJECTION ON VERTICAL PLANE 2S1. - 71. SCALED IN VERTICAL OEPTHS HORIZ SCALE : I/SO0 IN/FT @,~00 WELL NAME: 3C-2 SURFACE LOCATION:~ J37' FNL, 1378' FEL, S14, T12N. ;E, UM HORIZONTAL PROJECTION ~F 00007087S ~AI.£ = 1/~00 IN/FT r-~--.~'~-?' '~--~.-~-~-~ .-q--~+. ~-~?-~.'-- ~-++-~ '~"+~ ~ + ~ ~ : :~~T-~- .-&..~-..~-; ...... &.J...~,..~...~..~...~-~.~.%.~- ~-~.,$.J..4...$-.~--~..~..-.~-%-+-+.-*--+-~-+-+--..-~---+-+--~---~-~-+~--~ ...... +-.4.-++-+-~--~--+-~ ..... ~-~ ...... +-.L-~-.~---~--.?--~..+.++.~-~.+-.~-+--. -+~'"~"}'~-7:-?"-'?YT~'~'Z~-J"?"~-J-'T'~"~*-f-}-SJ5~T ~'~-T~'-"~-YZ'~'~ L.i._L.L.L.}...L.L.L.i ...... ~..L.Li..L.!...!..i..L.l...i..i..L.Ll.l.i.i~..i..L_L.k..L.L.L-L-i ...... L.!.. ~ 000 . .L.L.i...:. ~...i..L..L. ~ ...... ~..i..L.L.!...~..L.L-i ..... :..i._L.;...i...L.~...}...}...[.~..+..:: ...... }-. +---~-4--0 ...... ~.--==.--4---~.--}---4.-.4--+-~ ...... } }--4-.-4---~---~-~---:---~-.-{ ...... ~---}--.}..-{---}---~---{---i---i ...... }-.-~--.~--.~---+--~.-4.-4---~--- ~j~}. ~...i ..;..i...i...~..; ..;...i ...... ~ ~ L..;...;. ;...L.i.; ..~..-; ......... ;---4...5. i..-}-..4.--+ ......... ~ ¢-.4.-.~-..+---}---+.--4-.-~---*-~ ....... ---4-. +-4--}-- : ~i i :-LL ~ i_~ ~ ~ ,.,-~.~.~-i..~.~-~.- ~..~.' :-.~-i.-....~-~-~.~-~:-~x- [-'~-'~ ~ ~+ ~-~ {{ 5-~ ~:?* ~ ~" "~"~"~"~"~"?~'"7":,'-*-'5'?~'"~4-?"?'?"~'+'~"~"~-':2-'~"~'Z'~" '"7"~"'~"~"~'T"~- =~'~-~'"~' ,~'~T-7- '~'-J~" :~'~'-~- .......... ~I~.~ ................... · . ........ ....... ~-4..-4..x...1...;...~...;...:, ..... +-.5+.5-j-~-..f.+~- ;..¢-¢-~.4.-.~--¢.;. ~ ........... ~..x..~-.:...~-..~..~..;-~... ~ '.-~.-}--4----~----:--~5-}..-~---}-.~¢&--L-;.--~¢--~ ......... ~ ~ : i :: : · : · ~· , - : ' ~ i: · : - . - · : · - : - ...... : . i - : - . - · · i'~ ~ ~ ~ ~' ~'"~ :~i~ii~ili ....... .... ~ .... k-~?-~-?--PS'-~-+O-- ...... · "~"~'"~'":"~'"4'"~"-i'"4". . ' ....... l'"~ v-V'r-'?T-7'~ ~ LS---i..~..~-L~--~ : . : : -500 ' ' -~-.4-.4-+-.i..+-+-+..~ ...... 4-.?+--5-.-1--.~...-5- .~ .......... ~-"~--'r-?-'-r-'f'-?++'- -+.i'--~--~--'{--'~"'?--~'"~ ..... ?-+'+--+-'-! ........... ,'"~ .... ...~...~._f_?..i...p{._.p{... ''i ....... r"T"~"T"~-~'-T'T'' .:: ......: . ~ . ~ : : ~ ~ :. .... 5. ', ~..i..i...L-L.i-.L. ................ ~ · , .... : . . : . . : ~ . . . . } .... ~ ~, ............ i-..~..-,-.~ ....... ,-~..~.-~--~.--t-..~--~---i-~-.~--~---5---i-~-t : ~-~::~ ...i..!...L..i...l...L.L._i...i ,: :. .T..7.].-??-T-T..7..7..[-.~.--.~....~--.:---~.-.i---~...z...z... -1OOO ..... ~ .... . . . ' I . . . l'-g _.;...L.L..L.i._L..L.L..i.-. : : : ~' : = ~ ....... ...{.--~-.{.--{---i :~ ~ .--,-.4-..4..-,...,.:::: ..,...~ .......... ~ ....... ~ ........... ,..., ....... ~._~ t_.~...,...,._,...i...L.i...~._~_ ~~::~: ~---:--,-,--~-~--,--.-',-.- ~...~...?.~._+...~...~...:,... ,...,...,...~..., ~...~._:..., ........ ~...,...>.5.., :...~..~..~_.~...:...~....5 ~ ::::::::::::::::::::::::::::---:-~--.~-.,---,---,---,--,.-~-..~---,---,---~--~..*--~--*..-~~:~+~,.+, +..~-+ ~ ~-~..~..~-., ...... . ,,, ........ , ............................... , .................... ,...,...~ ~ ........ :::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::: -15OO ........ :'":"?'s ........... ' ..... ; ................... : ....... , - ......... ~ : : · ' ' ~ .... ' .... L.;...L.~..~.. ................... ~...; ........ ,...?...t...., ........ ,.-..:... ::::::::::::::::::::: ....... ~...L;:.:~:::;:::;::::::::~...~...:~:::~:::~:::~:::~:::~:~:..+...~...+..~...~...~...I....:....~....?...~...?.~..~..5..~:::~::~::~::~ :.~..:~:::~::.~...~:::~:::~...~...~...~...4...~....~...?....~....~...P~..~...+..~ -=,-} 5 { }: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~.::L:~..5::.I....~...i.:::~:::~:::U:::LL:~::: I ' ' . . . : '. : : I ' : : · - ~ : : - ~ ; i . .~..i ..... ~ .......... ~.. i ....... ; ......... i...i..! ............. i...i ............ :...i ............ 1...: ....... ;...i...l .............. ;... 1"7"7 ~'"?'l":" ?'~'' ~ .......... ; ........ ~"7 ~ '~'~7~"7~L~i~E~iLL~5>~Zi~LiS~:iL~.~...~ ....... : ....... :...i ..................... ~...~ ......... :...:-..-t-..: ........ :...;..-~..-: ....... ~ ........ : ............. 5...:...-} ....... :-..~---~-..~-.~..-:..-?~--- .......... ........ ............. ............. .... ' ..................... ....... ,-- ....... ....... -ao==~-':"'~ ...... ~"i'''~ ....... ' ...... t ........ :'"~'"~"i"'+ ...... :..--'---.}.-.:.-.+ ....... :--i--+..-~---:---~ ......, ~---~--~"~'q---~ ...... ~---~ ......, ~---~:'---'--+'-i"'~ .......... :"-~'"~'"5"'~-~-"t'-~-~'"' ....... ]--~---,-'~--~--i'--~----w--:--}+-~'---:---~--,"~'-~---~---:--' -gO00 -~SO0 -~000 - 1 ~00 - 1000 -~00 O SOO 1000 Suggested form to be inserted in each "Active" well folder to check for timely compliance with our regulations. OFERATOR, WELL ~AbIE AND Reports and Materials to be received by: /£:~ .... ~_~,_~ Date Required Date Received Remarks Completion Report / Mud Log Core Chips e stere Surv, Inclination Survey Directional SurveY .............................. q'~ . ,~ , Dr~11 8rem Test Reports .h~ Production Test Reports , Digitized Data ARCO Alaska, Inc Post Office ...... x 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 DATE: 10-10-85 TKANS[,II'I'T~L NO: 5393 RETUKN TD: Al{CO ALASKA, INC. KUPARU K OPURATIONS I{I_;COI<IJS (Jl,lJ I'd; ATO-1115B P.O. BOX 100360 ANCHOi~AGE, AK 99510 UI~GINEEKING ~,~-,o,.~.~.~LiD IIERIA,'LTII ARE TIiE FOLLOWING L'l'EblS. PLLASE ACKNOWLEDGI] . ,, ~ { '~ I{lJCEII'T A[~D kEIU.-~ ONE SIGNED CuPY 0/" Tills TI~ANSI.~I'I'TAL. OPLN IIOLE LIS TA['LS/ bClil,/ ONL T~d'E PLUS LISTING _ ~/3J-6~ 10-02-U5 i~UN ~1 -,~3J-5/ 09-25-U5 P, UN ~ 1 -,o3J-~ ~'' 09-17-~5 ~UH ~1 ~1;'-2 ~ 1.o-O2-U5 RUN ~1 ~3F-1 / UJ-2-1-U5 hU[~ ~1 '~-- 09-15-85 liUI] ill ~~3C-1 09'-23-U5 I<UN ~1 ~3A-4/ 09-21-U5 hUN ~1 ~2A-13~ 07-16-U5 RUN ~1 42U4.5-U649.5 4317.5-8679.0 16UU.5-8522.0 3493.5-7865.5 3944.0-8654.0 3U5~. 0-7622.0 2450.0-~308.0 379U. 5-84U4.0 7643.5-~16U.0 "'" ' PT knC]'.i ACKN O~ L EL) GE D: · bPAL 13. CUI<I<iEI'I C!IEVi{ON D &bi 1)'1' STI{iBUTIOII: D.IilLblilG W. P/'~SliLk L. JOII:ISTO]4 EX]COil ['('~* h £:'11 iLL lt'$ OIL NUK CLLIQK J : ....... . lxz~i IiWI'.'LL ARCO AL-.~An. Inc is a .Cubsid,nry o! AIInnl!¢RictlUe!dCompany ARCO Alaska, Inc. Post Office ,. .. 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 October 14, !985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commi s s i on 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: State Reports Dear Mr. Chatterton: Enclosed are the September monthly reports for the following wells: 3A-2 3C-3 3J-4 WSP-6I (workover) L3-5 9-29 3A-3 3C-16 3J-5 L1-2 4-21 11-8 3A-4 3F-I 3J-6 L1-14 (workover) 4-30 11-9 3C-1 3F-2 1R-3 L2-13 4-32 11-11 3C-2 3j-3 1R-4 L2-26 9-24 15-7 16-i7 If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU11/L62 Enclosures ARCO Alaska, Inc. is a Su"..~Jdiary of AtlanticRichfieldComl~'~y STATE OF ALASKA ALASKA C.~.. AND GAS CONSERVATION CO~.~MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. Drilling wel~ Workover operation [] 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 85-188 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21414 4. Location of Well at surface 537' FNL, 1378' FEL, Sec.14, T12N, RgE, UM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 84' RKB ADL 25634 ALK 2562 9. Unit or Lease Name Kuparuk River Unit 10. Well No. 3C-2 11. Field and Pool Kuparuk River Field Kuparuk River 0il Pool For the Month of September ,19 85 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well ~ 0415 hrs, 9/8/85. Drilled 12-1/4" hole to 3881'. Ran, cmtd, & tstd 9-5/8" csg, Drld 8~1/2'' hole to 7635'TD (9/14/85). Ran logs. Ran, cmtd, & tstd 7" csg. PBTD = 7514'. Secured well & RR ~ 1900 hfs, 09/16/85. 13. Casing or liner ru.n and quantities of cement, results of pressure tests 16", 62.5#/ft, H-40, weld conductor set ~ 110'. Cmtd w/186 sx CS II. 9-5/8", 36.0#/ft, J-55, BTC csg w/shoe ~ 3861'. Cmtd w/1000 sx PF "E" & 350 sx PF "C". 7", 26.0#/ft, J-55, BTC csg w/shoe ~ 7606'. Cmtd w/600 sx Class "G". 14. Coring resume and brief description None 15. Logs run and depth where run FDC/CNL f/7632' - 6650' & f/500' - 3858' DIL/SP/SFL/GR/Cal f/7632' - 3858' 6. DST data, perforating data, shows of H2S, miscellaneous data None 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SIGNED & ~ ~ TITLE Associate E.gineer DATE /0-/-~.~' NOTE--Report (¢ this form is required for each calendar month, regar~lless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10404 TEMP2/MR16 Rev. 7-1-80 Submit in duplicate '~ ~.-~'l~t~l. ~ ~ ~ "ll#~l} I~1~1~', on .till. fll'st -Wedneldly after a ell la apudded of'~ .~ ~ ~ started; _ · :~. ":/;.--- -~ D~I~Y w~l~ i~lm' m~m~#~g. ,~ouid ~ ~mmarize~ ~ the form giving Inclusive dates m'~ly,- ': · .~.:_: :?.~ '.:..-~:::. .. · . = .~-~.~.~ - mamct Alaska ' :' '~ . ': . : I~ty plrll}l or 13orougl"l North Slope Boroush Field ]Lease or Unit Kuparuk ~iver : I ADL 25634.. ! Autl~, or W.O, no. ITItle AFE 604828 I Drill IStete Alaska Nabors 26E AP1 50-029-21414 IWell no. 3C-2 Operator JARCO W.I. ARCO Alaska, Inc. Spudded or W.O. bagUnspUdded ]o.t. 9/8/85 [Hour 0415 hrs. [Prior status if a W.O. . Date end depth as of 8:00 a.m. 9/08/85 thru 9/09/85 9/to/85 9/11/85 9/~2/85 9/13/85 Complete record for each day reporled 56.24% 16" @ 110' 2586' (2476'), Navi Drill'g Wt. 9.2, PV 11, YP 13, PB 9.0, WL 12.4, Sol 6 Move rig f/3C-3 to 3C-2, Accep~ rig @ 22~0 hfs, 9-7-85. NU Tanko head, NU diverter sys, Spud @ 0415 hfs, 9-8-85, drl f/llO'-1411'. Trip f/bit, drl f/1411'-2500'. Trip f/BHA, ND f/2500'-2586'. 16" @ 110' ' 3797' (1211'), Drl'g Wt. 9.0, PV 12, YP 14, PB 9.0, WL 8.6, Sol 5 Navidril f/2586'-3692', POOB, PU BHA, RIB, work tight sopt, POOH, chg BHA, RIB, drl f/3697'-3797'. 2614', 3.8=, N85.SW, 2613.8 TVD, 6.6 VS, 0.SN, 7.1W 3085', 19.4", S71.2W, 3073.7 TVD, 101.3 VS, 23.4S, 99.0W 3586', 34.0°, S73.2W, 3517.4 TVD, 331.0 VS, 88.5S, 319.3W 3722', 37.8~, S72.2W, 3627.8 TVD, 411.0 VS, l12S, 395W 9-5/8" @ 3861' 3881' (84'), RIB Wt. 9.0, PV 12, YP 10, PB 9.0, WL 10.4, Sol 8 Drl f/3797'-3881' short trip. C&C mud, POOB, LD BHA. RU & rn 93 [ts 9-5/8", 36#, J-55, BTC ess. FS @ 3861', FC @ 3775'. Land hgr in Tanko head. C&C f/mud, pmp 20 bbl pre-flush, cmt w/1000 sx Permafrost "E" @ 12.3 ppg, & 350 sx permafrost "C" @ 15.6 ppg. Displ w/10 bbl wtr & 283 bbl mud. CIP @ 2030 hrs, 9-10-85. Bmp plug to 1500 psi; OK. Chk floats; OK. ND d~verter sys, NU BOPE, chg rams to 5", RU &tst BOPE to 3000 psi; OK. RIH. 9-5/8" @ 3861' 4569' (688'), RIH Wt. 9.0, PV 5, YP 10, PH 10.0, WL 14, Sol 6 Drl float equip, cmt + 10' new hole, 12.5 ppg formation tst. Drl 3', POOH, PU MWD &Navi Drill, ROB. Drl f/direction & angle to 4569'; two failures_. 3806', 40.7°, S74.2W, 3692.6 TVD, 463.8 VS, S127.5, W446.3 4280', 38.3°, S72.2W, 4049.6 TVD, 775.4 VS, S225.5, W742.1 9-5/8" @ 3861' 6219' (1650'), Navi Dril'g Wt. 9.2+, PV 13, YP 12, PB 10.0, WL 8.4, Sol 8 RIH, cut & slip DL. Navi Dril f/4569'-6219'. 4751', 39.5°, S70.2W, 4416.2 TVD, 1071.1VS, S320.8, W1022.0 5412', 37.6°, S72.2W, 4933.1TVD, 1483.0 VS, S453.5, W1412.0 6067', 37.2°, S73.2W, 5453.4 TVD, 1880.8 VS, S573.6, W1791.3 The above is correct -----t.. ".,. S. CONGDON 10/9/85 For fo~!'~ preparation and di*tribution, Title Drilling Superintendent ARCO Oil and Gas Company Daily /ell History-Final Report Instrucfiona: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned. or Sold. "Final Ref~t" should be submitted also when ope[~tioms ej'e suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and represental,[¥e test data in blocks provided. The "Final Reporl" form may be used lor reporting the entire operation if space is available. Accounting cost center code District County or Parish State Alaska North Slope Borough Alaska Field Lease or Unit Kuparuk River ADL 25634 Auth. or W.O. no. Title AFE 604828 Drill Nabors 26E API 50-029-21414 IWell no. 3C-2 Operator I A.R.Co. W.I. ARCO Alaska, Inc. I 56.24% Spudded or W.O. begun ~Oate Spudded ] 9/8/85 Complete record for each day reported Date and depth as of 8:00 a.m. 9/14/85 thru 9/16/85 9/17/85 Iotal number of wells (active or inactive) on this Dst center prior to plugging and I bandonment of this well I our I Prior status if a W.O. 0415 hrs. 9-5/8" @ 3861' 7635', (1416'), Rn'g 7" Wt. 10.0, PV 14, YP 10, PH 9.0, WL 6.0, Sol 11 Navi-Drl to 6946', rotary drl & surv 8½" hole to 7635', 10 std short trip, C&C, POOH f/logs. RU Schl, rn FDC/CNL f/7632' - 6650' & 5000' - 3858'. Rn DIL/SP/SFL/GR/CAL f/7632'-3858'. RD Schl. Make cond'g trip. Chg rams to 7" & tst to 3000 psi. RU & begin rn'g 7" csg. 6312', 37.9°, S71.2W, 5647.7 TVD, 2030.1VS, 619.2S, 1933.5W ' 6730', 38.5°, S70.2W, 5976.1TVD, 2288.6 VS, 704.7S, 2177.4W 7" @ 7606' 7635' TD, 7514' PBTD, RR 10.2 ppg NaCl/NaBr Rn 181 its, 7", 26#, J-55 BTC csg w/FS @ 7606', FC @ 7514', Mkr #1 @ 7131', Mkr #2 @ 6888'. Cmt w/123 bbls (600 sx) Cl "G" w/5% KCl, .3% Halad-24 & 1% CFR-2. Good rtns thru out job. Displ using rig pmps w/283 bbls 10.2 ppg NaC1/NaBr. CIP @ 1230 hfs, 9/16/85. ND POPE. Instl pack-off & 2-7/8" lower tree. Tst pack-off to 3000 psi. RR @ 1900 hrs, 9/16/85. Move to DS 3C-1. Old TD New TO 7635' Released rig Date 1900 hrs. 9/16/85 PB Depth Kind of rig Type completion (single, dual, etc.) Single Classifications (oil, gas, etc.) Oil 7514' PBTD Rotary Producing method Official reservoir name(s) Flowing Kuparuk Sands Potential test data Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The abC~e is correct ~'T ,~ '.':. 3. 10/9/85 ITM Drilling Superintendent For form preparation and distribution, see Procedures Manual. Section 10, Oril!inO PaQes 86 and 87 MEMORANOUM TO: THRU: Lonnie C. Smith Commissioner FROM~ Bobby D. Foster ~ ? Petroleum Inspector State of Alaska ALASKA OIL AUD GAS CONSERVATIOi--~ C .~OI~R~I S S IOi~ C.V. rton ~A~E~ September 16, ~9o5 Chaz~/~n ~ / FlUE NO: ~. ~A. 79 TELEPHONE NO: SUBJECT: BOPE Test ARCO - 3C-2 Permit '~ ~o. 85-188 Kuparuk River Field Wednesday, September 11, 1985.. The BOPE Test began at 4:00 A~f and ~-zas CEnclUded at 5:-00 AM. As the attached BOPE Test Report shows, there were no failures. In summary, I witnessed the BOPE Test on ARCO's 3C-2. Attachment 02-O01AfRev. 10179) : O&G #4 5184 STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.E. Inspection Report Operator ~~ _ Drilling Contractor Date Location, General f?/// Well Sign_~~ ACCUMULATOR SYSTEM General Housekeepin~Ri~_fO~' Full Charge Pressure ~p~ ~ psig Reserve Pit ~>/~ Pressure After Closure /~O~ psig. Visual Audio ~ud Systems Trip Tank Pit Gauge Flow Monitor Gas Detectors BOPE Stack Annular Preventer Pipe Rams Blind Rams Choke Line Valves H.C.R. Valve Kill Line Valves Check Valve Pump incr. clos. pres. 200 psig Full Charge Pressure Attained: Controls: Master & sec. mi~s ea. Remote~ ~ Blinds switch cover Kelly and Floor Safety Valves ~' Upper Kelly / Test Pressure ~d ~ Lower Kelly / Test Pressure ~D ~ Ball Type / Test Pressure 3~ wa Inside BOP / Test Pressure Choke Manifold v~Test Pressure NO. Valves No. flanges Adjustable Chokes z-~ Hydrauicalty operated choke Test Results: Failures fD Test Time Repair or Replacement of failed equipment to be made within hrs. --- day~ and Inspector/ Commission office'notified. Remarks: Distribution orig. - A0&GCC cc - Operator cc - Supervisor August 12, 1985 Mr. J. B. Kewin Area Drilling Engineer ARCO Alaska, Inc. P. O. Box !00360 Anchorage, Alaska 99510-0360 Re: Kuparuk River Unit 3C-2 ARCO Alaska, Inc. Permit No. 85-188 Sur. Loc. 537'F~L, 1378'FEL, Sec. 14, T!2N, R9E, ~. Btmhole Loc. 1402'F~IL, 1270'F~, Sec. 14, T12N, R9E, UM. Dear Mr. Kewin: Enclosed is the approved application for per-mit to drill the above referenced well. If coring is conducted, a brief description of each core and a one cubic inch size chip from each foot of recovered core is required. Samples of drill cuttings and a mud log are not required. A continuous directional survey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadrom0us fish. Operations in these areas are subject to AS 16.05.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's~Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to commencing operations you may be contacted by a representative of the Department of Environmental Conservation. Mr. Jeffrey B. Kewin Kuparuk River Unit 3C-2 -2- August 12, 1985 To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Con~.ission may be present to witness testing of the equipment before the surface casing shoe is drilled, i~ere a diverter system is required, please also notify this office 24 hours prior to comm~encing equipment installation so that the Co~ission may witness testing before drilling below the shoe of the conductor pipe. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Very~truly y~gBr s., C. V. ChaE'~erton ' Chairman of Alaska Oil and Gas Conse~ation Co~ission BY ORDER OF THE CO~'~ISSION b~ Enclosure CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Mr. Doug L. Lowery ARCO Alaska, Inc. Post Office DE ~0h360 A.nchorage, /ki~4si,:a 99510-0360 Telephone 907 27~$ ]215 July 22, 1985 Mr. C. V. Chatterton Commi ss i oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Kuparuk 3C-2 Dear Mr. Chatterton: Enclosed are: An application for Permit to Drill Kuparuk 3C-2, along with a $100 application fee Diagrams showing the proposed horizontal and vertical projections of the wellbore A proximity plot A diagram and description of the surface hole diverter system o A diagram and description of the BOP equipment We estimate spudding this well on September 3, 1985. any questions, please call me at 263-4970. Sincerely, , ,~B,~~~wi n~¢¢' ~¢~Area Dri 11 i ng Engi neer JBK/JFB/tw PD/L137 Enclosures If you have ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA OTL AND GAS CONSERVATION COr¢~'MISSION PERMIT TO DRILL 20 AAC 25.0O5 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL I~X DEVELOPMENT GAS [] 2. Name of operator ARCO Alaska, Inc. SERVICE [] STRATIGRAPH lC SINGLE ZONE~ MULTIPLE Z ~¥;_E [] 3. Address P. 0. Box 100360, Anchorage, Alaska 99510 9. Unit or lease name Kuparuk River 4. Location of well at surface 537' FNL, 1378' FEL, $ec.14, T12N, RgE, UN At top of proposed producing interval 1294' FNL, 1599' FWL, $ec.14, T12N, R9E~ UN At total depth.,..,~ 1402' FNL, 1270' FWL, Sec.14, T12N, R9E, UN ~' 5. Elevation in ~;e:t (indicat~ ~B, ~F e~-c.) 6. Lease designation and serial no. ..~ .[,_.Z RKB 84', PAD 47' ADL 12. Bond information (see 20 AAC 25.025) Type Statewide Surety and/or number 10. Well number 36-2 11. Field and pool Kuparuk River Field Kuparuk River Oil Pool Federal Insurance Company #8088-26-27 Amount $500,000 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed 30 mi. NW of Deadhorse miles 537 feet 3C-3 well 60' @ surface feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date 7506' MD, 6572' TVD fe~t 2560 09/03/85 19. If deviated (see 20 AAC 25.050) 20. Anticipated pressures 2800 psig@__80OF Surface KICK OFF POINT 2496 feet. MAXIMUM HOLE ANGLE 39 o (see 20 AAC 25.035 (c) (2) 3217 psig@. 6249 ft. TD (TVD) 21 Proposed Casing, Liner and Cementing Program SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT _ _ -- _ Hole I Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOMTVD (include stage data) 24"! 16" 62.5# H-40 Weld 80' 37' I 37' 117'1 117' + 200 cf 12-1/4,, 9-5/8,, 36.0# .-55/HF-EF:W BTC 3767' 37' 37' 3804?, 3704' 68O CS sx Ill & i ~i 350 sx CS Ii i 7" 26.0# ~-55/HF-EFW BTC 7470' 36' I 36' I 7506'1 6572' 300 sx Class G 8-1/2" _ __ 22. Describe proposed program: ARCO Alaska~ Inc., proposes to drill a Kuparuk River Field development well to approximately 7506' ND (6572' TVD). Selected intervals will be logged. A 20"~ 2000 psi annular diverter will be installed on the 16" conductor while drilling the surface hole. A 13-5/8"~ 5000 psi, RSRRA BOPE stack will be installed on the 9-5/8" surface casing. The stack and related equipment will be tested to 3000 psig upon installation and weekly thereafter. Expected maximum surface pressure is 2800 psi. Pressure calculations are based on virgin reservoir pressure. Surface pressure is calculated with an unexpanded gas bubble at surface~ including temperature effects. Casing will be tested to 3000 psi prior to releasing the drilling rig. Non-freezing fluids will be left in uncemented annuli through the permafrost interval. 36-3 will be 60' away from 36-2 at the surface. There are no closer wel]bores anywhere downhole. Reserve pit fluids will be disposed of by pumping them down the 7" x 9-5/8" annulus of this well. The 7" x 9-5/8" annulus will be left with a non-freezing fluid during any interruptions in the disposal process. (continued on attached sheet) 23. I hereby certif~.y~hat the foregoing is true and correct to the best of my knowledge SIGNED / TITLE Area Drilling Engineer The spacey/ ~;r ¢¢/)r~nj/s~i~)~'use ' CONDITIONS OF APPROVAL ~ Mud log required I Directional Survey required Samples required '~YES [~NO i []YES [~O i {~-~ES E~NO Permit number ,~/ . Approval date (JFB) PD/PD137 APl number 50- o '~ ¢ - ~'~ ~-/Y APPROVED BY Form 10-401 Rev. 7-1-80 SEE COVER LETTER FOR OTHER REQUIREMENTS "',COMMISSIONER DATE August_ 12, 1985 by order of the Commission Submit in triplicate PERMIT TO DRILL 3C-2 (cont'd) Upon completion of the disposal process, the 9-5/8" x 7" annulus will be sealed with a minimum of 200 sx cement followed by Arctic Pack. The well will be completed by the workover rig using 3-1/2" or 2-7/8" tubing. Selected intervals will be perforated within the Kuparuk formation and reported on subsequent reports. A subsurface safety valve will be installed and tested upon conclusion of the job. After the workover rig has moved off location, this well will be fracture stimulated. ..... :__PAD '3C. WELL NO, 2' pR~ .... KUPARUK FIELD, 'NORTH SL!OPE, ALAS a · ..... ~ ............... : - ' ................... : - .- : --. i ~-- BASE PERMAFROST TVD~1711 -- ; -' --2nOG_ .......... ' ...... ; ~-L;'7:; ...... .... [ _3 TO" UONU SHDS. TVD=254g THD=254g ~< ...... ......... 21- 'T , ' : =__2: . I ~' OP ~ SAK SNDS-- TVD=3224 T~D=3243-:DEP=144 ..... :: .... :J-:~" .L ..... ' 27-.-K-~I2:--.TVD=3504L-T~D=3558 DEP=287: _~;--'L;- 1-~3 EOC (C8¢ PT) TVD=3704. ; T~D=3804 DEP=430 ..... ....... _ ...................... : ~~ TOP UPPR SNDS TVD=614~ THD=6957-DEP=2424 ...........__:I-: ' I~. :.~ :._ . "' ._? :, TARGET '-CNTR .TVD=6249 'T~=7089 DEP=2507::" :;'- . - -,. ............... ~ ' :-TOP LOUR SNDS TVD-6284 T~D-~I~4 DEP-2S36 .... ......................... _. _.: -~CT~-BASE' KUP.: ;SND8~- TVD=6417~-/~'~306 '-D~-2645~C .......................... ; ' TD (LOG PT) - TVD=6572 TMD=7506 DEP=27T1 ............... L .............. ~ ............ - .............................. , . ....... ; ........ {. ' ............... ._ _. ~~D ...... ,, . -VERTICAL--SEOT~ ON - ...... ~ - .- . , . ..... f ............. ~ ............. ; _ . _ · . - : · - ~ ~ ..... !-- 2000 2 P~ROPOSED ~ NORTH, SLOPE. ALASKA i KUPARUK F!ELD, ! !: :WEST'EAST!:' ' ~ i ' , , '; ~ ~ ' '~ooo ! ~ooo ~ ~ooo . ; ~ ~ : ". , ~ .... * .... ,. . ' ' , ~ . !.~'{~~~~ ~, ', ~ :,:~, / ' i ;, , 2507' (TO TARGET) : i ' I ! EASTHAN WHIPSTOCK, 4000 ! I ' , I t NOR. , 21 O0 2,000 ;I 900 il 800' 700 ' 600 '1 500 1/,d. DO 1:300 1 200 200 ! ' i -- i ' ' · I i ' "'~! 3541 , . ' 467'6, ; ' ' ', ; '. , ' . ;3458 , , 300 _, ...... , ........ ~ ....................... . ....... , ............ ~ .a.._., ........ ~ ....................... · . ; , ; · , . . / : " . · , ' i" ~ ' ". . ' ; .,,,,/ . ' ' I i I ' ' { : ' ' '. ' ~ ' " ~ ' ! ' ' . ' ' 't~,~ ......... ~ .., ' ............. , . .; ...... !. ................. ' .... ~ .................... ~ .................. ~ ..... .-I ', PAD 3C...UELL Uq, 1-2-3-4 I PROPOSED ;'."'.'"i .......... t'"f': ......... :"'*. ............ t ........... ~" ,. , '. I. _ · I ~ , : J iKUPAflUK, FIELD. :NORTH SLOPE'~' ' ', I, , , "' ". EASTMAN"UHIPSTOC;K.- INC.: {' : '. 500 ..I ..'...L_: ........ NOTE ~....L.. UEL'L... P. ^THS.. EXTEND. BEYOND.._.L.L..L.{ ..... Zz..~..J__i._..:._..L..! ....... Z..i ........ ;._t ..: ................ L ........... ~ ....... I.": ........... ':....t ................ ~ ............... i..!..': ..... :..I .......... : ...... i .......... , ..... ' ........ ' I:' : t:: ~',J ,THIS..VIEklINO t~IND01~ ',, '. " I '',~I~' 'I ,-! , -t .... , Ii / ' ~ i ~'J ' J ':J'l' ", 'r'L~"'/¥F'~ , ' t; ' ' . ' ' " ' ; ~ ' ', ' ; ' '{ ' " ' { I ' '~' t I ' ; ' ~ ~ ' ' 'I .... I .. :.'t '. . I , '' ' I - ' ' ' '~ ' ' ;- ' "'<'"' ' ' ; ' ' ' ' i ' I I ~ J i 'I ' I i , t : " : ' . , ' ~ ; I' ' ' t i : t ' ',: ' ' ' ' ' i . ~ ; i ' : ' '' ; ~'.' '' ' ' ' J ' .... j : '., i ..... "' ', . . ' ' %.~ V %,~' . ;. ........ .;...,. .... ;._ .' ..... ,'! , t, ~, { ,' ,,~-:---~ ..... t", ....... :"'t ...... ' ' ' I .... ~ ' ~ : I ' ' ' ' ' ........ ; ' 'I ': ': I"! ....... ," /'" ~" [" .:,.~..L 'i ~' ....... " :" _~r" I ' '.--V~' '" ; . "~ .... t ' ' I ' :fi ' ' { ..... ;' ' ' , ' ' ,; " ' ' . / 'l , I. :;-'.:-- i~~r~ i'--.~ ";.,'l" ~, ,,~ {' U ' ' ' : I ' ' ' J l "' "~ ' .~ , ' ~ , ~ ; . . ' ' ' t ' ' ""' '~ '~' .... t ' ' . ' ' ' ' . ' ..... I ~. ~.~.' ' , , ' , ' ",' . ' , , ' ' . I j ., i . . , 1978 ' ' '... . i , ',j.~ ,i' !' ~; , ".. ,.-i :,. ... ...,, .... ' : L ,~$~.l',!l',} }' / :~, : ~,I;:'.I , , ' : Z'..:::' i ! .:1 . i. ,~ . I! I I! ' ' ~ ~ ' ' I ~ , , ' ~ ' ' ' ~ { ' ' m ~. r , , . i , .. ./ .... ,, , , , I ..... ./1 ' '.. j { , . ...... { . · ' I I I , I ~ ' ' '. I , ' , ' ' ' , ' I ~ , ~ r , __ , .... r...,. ,-, ..... ,-.. 1; :. ..,...r.- ' .............. I ' ' ...... """7,P' ................. ............... ....... ' .... '' J ' '] {.. j .... ' ' ' '. ' ' I ' ' ' I"~ : ' ' ' '. ' ' ' ' '}' ' ' , ,i'..,~ 'i ~. , ' ; ~ ~t ! :, , t,.,., ~ . KUPARUK IRI VER UNIT 20" .DIVEJ~TER SCHEMATIC DE S CR I P T I ON I. 16, · C~CTOR. 2. TABOO STARTER HEAD. 3. TAI~O SAVER SUB. ' 4. TAf'~O LO~IER CXJ]'CK-COf,C~CT ASSY. 5. TANKO UPI>ER QOI CK-C~CT A$SY. 6. 20' 2000 PS]: E::~ILLING SPOC~ W/I O' OUTLETS. ?. I0' HCR BALL VALVES ~'I/lO' DIVERTER LINES. VALVES OPEN AUTOMATICALLY UPON CLOSURE OF A~AR PREVENTER. 8. 20" 2000 PSI Ah, I"~LAR PREVENTER. MAINTENANCE & OPERATION i I. UP-ON INITIAL INSTALLATION. CLOSE PREVENTER AND VERIFY THAT VALVES ' HAVE OPENED PROPERLY. 2. CLOSE ANI',~LAR PREVENTER AND BLOW AIR THROUGH DIVERTER LINES EVERY 12 HOURS. CLOSE ANNLILAR PREVENTER IN THE EVENT'" ...... ~A FLUIDS ~ GAS IS ~TECTED, IF ~CESS~Y, ~ALLY OVERRI~ A~ CLOSE APPR~] ATE VALVE TO ACH]EVE ~~]~ D]VE~S]~. DO NOT SHUT IN ~LL UNDER ANY CIRCUMSTANCES. ,, , i · i ii i i i i i i i ii ii 7 6 DIAGRAM #1 13-5/8"':500Q PSI RSRRA BOP STAQ< I. 16' - 2.000 PSI TAN(CO STARTING FF_AD 2. I1' - 3000 PSI CASING HF. AD 3. 11 · - ~ PSI X 15.'-5/8' - 5000 F~I SPACE~ SPOCL 4. 13-~/8' - ,5003 PSI PIF~ ~ 5. 13--5/8' - 5000 PSI DRILLING ~ W/O-O<E AND KILL LII~F_S G. 13-5/8' - 5000 PSI DOJBLE RA~ W/PIP5 RA~ ON TC~, 7. 13-5/8' - 5000 PSI ~ · ACQ,.MJ~ATOR CAPACITY TEST I. CPISCX AhD FILL AC~TCR RF_~OZR TO LEVEL WI~ ~IC ~UID. 2. ~ ~T A~T~ ~ IS ~ ~I WI~ 3. ~ TI~, ~ ~ ~ ~ITS SIXThlY 4. ~~ ~ ~ ~T, ~ A~~ L~ LIMIT t 5 4 3 2 13-5/8" BOP STACK TEST 1. FILL BCP STACK AhD CHCKE MANIFCLD WITH ARCTIC DIESEL. 2. Q-ECX THAT ALL LOCK DO~ SCREY~ IN ~ELLPEAD ARE FULLY F~:'T. RACTED. SF_AT TEST PLUG IN WITH ELt~IN6 JT AhD Rgt4 IN LCa<DO/~ SCREV~. LINE VALVES ADJA~ TO B(:]3 STACX. ALL C~ 4. P~~ UP TO P_50 PSI AND HCLD FCR I0 MIN. IN- C~ P~E~ TO 3000 PSI-AND HCLD FOR I0 MIN. B[ ~';n P~E~ TO O PSI. 5. OPEN AN~LLAR P~ A~D ~A~JAL KILL A~D CHC~E LI~E VALVES. CLOSE TCP PIPE ~ AhD HOR VALVES ON ~tLL AND CNCKE LIhF_S. 6. TEST TO 250 PSI AhD 3000 PSI AS IN STEP 7. CCNTIhL~ TESTING ALL VALVES, LIeF_So AAD CHCKES WITH A 2.50 PSI LOH AAID Z~XDO PSI HIGH. TEST AS IN STEP 4. 5o N~T Pp~~ T~T ~ ~ ~AT NgT A FLLL CLOSIN9 POSITIVE SEAL CA~<~ C~L¥ ~ICt~l TFET ~S THA-r DO NOT Flay CLOSE. 8. C:PEN TCP PIPE ~ A~ C:LOS¢_ BOTTC~ P];PE TEST BOTTOVl PIPE ~ TQ 250 PSI AhlD 34:X~ PSI, 10, O_CI~ BLII~D ~ AND TEST TO 2_50 PS]: AN3_ 3000 '~IFO.~ Ar~ L~S A~ FUL~ CC Ft.U~D. ~ AU_ VAL.V~ IN ~ILLING ~ T~ST STAr, O:~PE VALVES. K~ Y, ~LL¥ Cea<S° P~PE S~ VAL.VE, A~ INSI~ ~P TO ZSO 3000 I;5o 1~~ TEST ~I~F'~TIClN ON BL~ ~ TEST FORM,. SIGN, A~D SEAD TO ~RILLING SUPERVISOR. 14. PERFC~ (X~ BOPE TEST AFTER NIPPLING UP A~D WE:~Y TNERF~F_.~~ICI~Y OPSRA~ 80:'5 DAILY, 5 i 0084,001 REV. 2 MAY I 5,, 198~ ARCO Alaska, Inc. Post Office b.,x 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 Hay 20, 1985 Mrs. Elaine Johnson State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Conductor As-Built Location Plat - 3C Pad Wells 1-16 Dear Elaine' Enclosed is an as-built location plat for the subject wells. you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU6/L113 Enclosure If ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany N O IR T H SEC. II SEC. DRILL SITE 3'C ,,~:,..-~oo, AS- BUILT CONDUCTOR LOCATIONS WITHIN SECTION 14, TI2N, 'R9E, U.M., ALASKA NOTE: COORDINATES ARE ALASKA STATE PLANE ZONE 4. SECTION LINE DISTANCES ARE TRUE. HORIZONTAL POSITION PER LHD ~ ASSOC. MONUMENTS 19-1 6 19-2. VERTICAL POSITION PER LHD 6 ASSOC. TBM OPI6, 8 DOC. 125. *WELL NO. 6 INFORMATION PER DWG. NO. NSK 9.05.$03dl. WELL · _ Y = 5,995,855.15 X= 528,205.68 596"FNL, 1366'FEL Lat. = 70°2.3'58.955'' Long.: 149°46°13.622'' WELL Y = 5,995,893.75 2 X= 528,193.14 537' FNL, 1378'FEL Lat. = 70023'59.532" Long.= 149°46' 13.983' WELL 5,995,952.43 528,180.60 478'FNL, 1390'FEL Lot. : 70024'00. I!0" Long.: 149°46' 14. 343' WELL Y = 5,996, 011.07 4 X: 528,168.12 420' FNL, 1402'FEL Lat. = 70°24'00.687' Long.-' 149046' 14.703" WELL Y = 5,996,086.35 5 X= 528,520.16 346' FNL, 1050'FEL Lat. = 70°24'01.414" Long.= 149°46'04.380 ' WELL Y = 5,996,027.76 6 * X: 528,532.83 404' FNL, 1038' FEL Lat. = 70°24'00.837" Long.: 149°46'04.015" WELL Y= 5,995,969.11 Lot. = 7 X = 528,545.24 Long.: 463'FNL , 1025' FEL 70024'00.260" 149°46'03. 658" WELL Y= 5,995,910.44 Lat. : 8 X= 528,557.71 Long.= 522'FNL , 1013' FEL 70°23' 59.683" 149°46' 03.299" WELL Y= 5,995,372.49 Lot. = 9 X= 5.28,672.61 Long.= IO60'FNL, 901' FEL 70o25,54.387, 1490 45' 59.993" WELL Y= 5,995,314.06 Lat. = 10 x=528,685.04 Long.= 1119'FNL , 889' FEL 70° 23' 53.812" 149o45'59.636" Y = 5,995,255.22 Let. = 70°23'53.233" WELL '11 x=528,697.61 Long.= 149045'59.274" 1177'FNL, 876'FEL Y = 5,995, 196.51 WELL 12 x= 528,?~0.~9 1236'FNL, 864' FEL Lot. = 70°23'52.655'' Long.: 149°45'58.912" Y: 5,995,121.33 WELL 15 x: 528,358.~0 1310' FNL, 1217' FEL Lot. = 70°23'51.929" Long. = 149°46'09.235' Y = 5,995,180.01 WELL 14 x= 528,345. e3 1251'FNL , 1229' FEL Lot. = 70°23'52.506" Long.-- 149°46'09.594" Y: 5~995,238.66 WELL 15 x= 528,3~3.o7 1193'FNL, 1241'FEL LoL = 70°23'53.084" Long. = 149o46'09.956" Y= 5,995,297.32 Lat. = 70°23'53.661" WELL 16 x= 528,~20.55 Long.=~9°46'~0.~" 1134' FNL, 1253'FEL CERTIFICATEOF SURVEYOR .' i HEREBY CERTIFY THAT I AM PROPERLY ~~-- -- REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE Of ALASKA AND THAT THIS PLAT REPRESENTS A LOCATION SURVEY ~ MADE BY ME OR UNDER MY SUPERVISION, AND ~--~- ~.' ' II THAT ALL DIMEN$1ON$ AND OTHER DETAILS~ ~ ~',,' II~Y~ f0~: ARCO AI~, l~ . ~.,~ov ~ IIDATE MAY 14, 19851 ...... -- f, ~ ,, .., [F· ,. .... ...., ~40 Arctic Boulevard, Suite 20L A~c~or~o, AlasR~ ~50~ ~oo8 ' ~. CHECK LIST FOR NEW WELL PERMITS Lease & Well No. "" ',i?,' ~'' ~' ITEM APPROVE DATE (1) Fee " ......... !;:i" - ~-~' + ,~,, .. (2) Loc //~. ~- ' (2 thru 8) (3) Admin .,,' ..... :~ '" ~.. ,(9 thru 12) (10 and 12) · YES NO Is the permit fee attached .......................................... 2. Is well to be located in a defined pool ............................. 3, I~ well located proper dl~tanc~ from proporty ]lno ,,,,,,,,,,,,.,,.,,,:.,.:~,. 4. Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool 6. Is well to be deviated and is wellbore plat included ................ 7. Is operator the only affected party .................................. 8. Can permit be approved before ten-day wait eeeeeeeeeelleeee~eeeeeele·~,.,~''~ . 10. 11. 12. h b d i f ~"' Does operator ave a on n orce .................................. ,,',;.~ Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... REMARKS (4) Casg (13 thru 21) 13. 14. 15. 16. 17. 18. 19. .20. 21. (5) BOPE .... . (22 thru 26) 22. 23. 24. 25. 26. 27. I conducto string provided s r ........................................ Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will f i g pr f h sur ace cas n otect res water zones .... ......... . ......... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ..., ......... Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... Are necessary diagrams of diverter and BOP equipment attached ........ i.:i.'.~i~/~ Does BOPE have sufficient pressure rating - Test to i.' .~ :" psig ...~":-~ Does the choke manifold comply w/API RP-53 (Feb.78) .................. Is the presence of H2S gas probable ................................. Additional requirements ............................................. ,/ o ~z ~ o Geology: Engineering HWK , LCS .... lc.i,( BEW/ ~A~ MTM ~f~/ HJH .' rev: 03/13/85 6.011 INITIAL GEO. UNIT ON/OFF' POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXi No special'effort has been made to chronologically organize this category of information. ********************** CATE SIZE CODE 000 000 016 065 000 000 0~,2 06B 000 00'0 014 000 000 002 065 000 000 004 065 000 000 002 065 000 000 012 065 000 000 006 065 000 000 (104 Off5 UNTT TiPE CATE SIZE CODE 000 000 00t 065 g,e'25" La 3P6'1.0' - }"~?',l' $.'[,ZE = 8.5" TO l.,., O v, $ n,b 'T D ~ 9.5 R,~4C = 2,680 Ia 63 O DF * OaT~ ~r~iI,A~[.,~:: 7596,0' Tn 66~.0,0' * * !)~T.~ ~',/.~IL,~P-tF: 50(..'0,0' TO 38.':;fl,0' · · i: , , , , , , , , , , .'4,: · , :J.: , · ,' , , , , :,: , , , t, , ~P~'~ 8;~R~ICg S~P,v'ICF; t,!~T'f At~I Ap,T AP,I. ~PI PI E $I%g SPb lqEPR PRnC.~SS LVP O.!n,w(i~ vLPlI.~'IC&TiPN [~T$ '~ING PAC.,E 4 ;w t" l:,> S 00 00 0 n 0 0 0 no 22n Ol 0 0 oo 1 2n ~o 0 0 Oo ! ~0 44 0 0 o 0 0 !. o 01 0 0 OO ~, o Ol 0 o o 0 31 o 0 '1 0 0 n 0 ~ 8 o 01 0 0 O0 350 02 0 0 oo ~56 ~ ~ o ~ n() 420 o 1 0 0 Oo 00~ o0 0 0 A() Rqo 00 0 0 O0 330 31 0 0 00 330 30 0 0 68 68 68 6~ 68 68 000000000.0000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 OHO00000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 D E; P T N p H I DEF'T SP DEPT S'.P NPHI D~;DT RHnB NRHi D ~O ~3 O E t,' T 7 f~, 48. ~ 000 - q 99. P 500 t 0~4.3 76 U 0,00 n 0 ~, 43~8 47.qlq9 00 000 0 134,7168 7,400. 0000 -,1 ;!. 05'10 -37.~633 2.!.897 7100, nOt)t) 2g DF<HO N C N ~"! C )"! b SFLU ,g F t., U SF'LU ~' )9' t,:~ h 8308 1~5d..6875 3.~,272 lbt> 9a.9648 ~R 0.04t0 NRAT 2.3't92 98.0273 ~R 2.62'72 Yt,,!) 1,1~.9023 ~R 0.0464 NRA'I 106q.68'75 PC~L 4~,3242 I[9 60.3242 (;R 254!.5000 PCS!b '25 !:5 q. S 0 ':3 o P:C ~'~ -qgg 2500 3,398 '1 !, ~ 40 , 687 2.8127 378.3906 3,5354 527.3125 ~,8752 101,,5898 3,1.545 697']125 2.0686 100.5808 ) 6858 481~3906 2 6663 9.4~4023 3.6057 520,8125 27.333O 53.2930 2.996,:3 796.~125 t,0'1!0 7q,5898 2,7834 ~9~,3125 CALl R NRA RNRA RND, A. .I L, Y C A L I R~vRA T b ~ R N R A Ih~ CAbI -g99 2500 3,5940 ~.0045 9,1035 3,5178 2,9885 9,9238 ],3167 2,1604 10,0723 2,6975 ], 815 25,6143 9,5,410 3,t877 7 , 3718 10'5020 2,8674 N' p 141 DE, PT $ P D F: P ',[' DEPT SP 1, SP D E P T SP D E P T SP D E P ']' SP NpH 1 D E P T DEPT S P D i;'P T SP R H r"~ 6 2.45'13 1") K q O -24,.n732 GR 51 .0742 ~,~Ct~?L 6 S 00, n 0 ~ 0 ,q F L, tj -,ogq.. 25¢)0 -a 9 q. ? 500 ~'{' C ~','! h ,.,,. 0 !) o ,, 2500 - o 9 O, 2 50 o ~,~ C ~"~ 1,, '1 !. a (.: ? 3 G +k O. 0372 ".!R ~T 3.765¢ Tk.,n ! 28 .q37b (.~ !.4649 122.2'773 -O.nOq3 2030.6875 242'5625 1.76.93'?~ -q99,25eO -090.~5a0 -099'2500 FC~ft.,, ,4,13.3fi '.l'[..,a -090,~5r)0 ~rRflT -090,2500 PC~,!L 1.68 ~ 5 1.56.1875 ,-099 2500 -09o: 25r.t0 1.54,06175 GR -090.25C{0 76,6523 3.0959 B67.g125 2.8420 1'I. 3.5273 3.07R4 736.]125 1 6055 4.0632 487.3906 2o0100 !1a.6523 3.6370 48~.3906 ?.3'752 141.q375 -999,2500 -090.2500 255,0625 : 9 .2soo 099,25"o0 .2.8323 94 ~6~ -a99.,25oo 2.4143 ~56.9375 -090,2500 -990.2500 3 5667 109:(3898 -990,2500 -999.2500 1.q~20 164.3125 -g99,2500 -099.2500 2,0940 140.5525 -990,2500 CALl I [., I~ CAT. I CALl CALl ~NRA CALl T CALl RNRA R l,~ R ,A CALl T L CAt.,','[. 14.0020 10.00~8 3.4709 2 9592 1,7149 I0 0957 4:1648 2 0491 10i8145 3 8831 24299 10!9551 -999 2500 -999,2500 -9 '2500 2 4143 11. i6582 -999'2'500 3.6584 11.6270 -999.2500 1. 8946 11 O008 -999" 2500 2,0920 1,0,5332 -999,2500 N P t,41 - 090 .. 2.500 .,x~ C ~,! b r) g p T b 490. O 000 ,S F l, U N p .q. tL - o 90.2.500 ,~.! C t,,l b DgPT 5000. OOf3O SFt, U 8 P - 4 ,t. n 82 ,.') C,. ~.< N ~ H !; ~ 4, o R ! 4 ,.5 ~,~ C ~,I b 2.07 f-..'} .TL~ 70,6573 -o90.25n0 -~9g. 25n(', F'CNb 2.26e 8 9R,214~, :099 2506: 099' 2500 1.9522 TLP 85.5273 -999,2500 2.0315 89.6523 -090,2500 9.9299 1.2t.~273 -o99.2500 1 , g 4 ~1 10 ~', 1523 "090,25O0 -09o,25o0 3 n 9 P 0 l [, t) ,-, O 9 cJ. 250o 2.8030 -oqO 2500 2999 ! 2500 , 099 2500 ~.,0237 86. B 398 -o90 2500 -99g: 2.500 2.0022 81.3.~98 -g99.2500 -09g,2500 ~,545 -999. 2500 -999.~500 2, 581. 125..1523 -099,2500 -099. 2500 2,02~'7 90,7773 -g99.2500 -o99'.2500 ~,5510 ~.o~.e398 :o99 2500 o90: 5oo 3,0588 99.5273 '099,2500 '999.~500 3.!.096 661.~:125 3,7542 CALl ~NR.A .T[,U CALl CAbI CA I,, ,I RNRA IbM CALI RNRA CALl RNRA CALl RNRA C ~ L I R NRA CALl C A L I ].0120 9.7051 -099.2500 2,2971 9 92~8 -999[~500 2,0315 9,9863 -090.2500 2,0159 9.9941 -999,~500 2,1604 9,0691 -999.2500 I1 8145 -099'2500 2,0374 9,5488 -099'~500 2,5491 9.96~9 -990,2500 3.0901 1~.1426 '99 ,2500 3,0667 10.3301 3,7483 3.6 2.1 3 9,9 47 3 · n 000 ,'::i F r, U DEPT '! rq 01")., .... $ F' '" 61, r; ,1. 33 t; R D E P T ~ ? 0 ,"). O 00 t,) ,,q F !,, U $ p ... (, 7. n '977 q t4. 2.7502 T l.,n 1 .1, 4,659 ..1 CP n. n 01 (.: ,',! i-,~ ?., '.[' 242~.5000 r C k'.L~ 2.q].04 TLr; 2 ~.<4 "t. 50(') 0 F'CN t, 8g.7773 GR 3.20!4 lbo 9t.4023 GR 232~.5000 ~'C~h !.02.7148 2.0795 TLP t01..9648 Ga 0.0610 22~7.5000 FCNb 2.0026 !02.4.023 0.0008 2!29o5000 ~CNL 4.75R5 ~02.58gi~ ~ .i~ 2313,5000 t.!272 2.937'7 3.t74~ 750.3!,25 3.092t) ~10,5273 ].0647 755.8125 2,9338 90.0808 6~3.3125 3.5295 95.8308 3.3303 706.~125 3.0979 101,3308 3,3557 ~90.3125 3,0276 1.00,~273 3, 307 524..~125 '!01.0898 3,553O 59q.81~5 3.0549 93.2773 3,7659 54.3.3125 4,9304 94, 214,8 3:5647 634.g125 5.5867 04 0273 570,31~5 CAL ~ P .iP A C A I., l C ~ !.., I RNr~A rT. & [, I ALI ,,NRa 2.q1~2 10 3145 3.01g8 10 1426 3:0909 :2.. 9241 to:oo o ?,681.9 3,4104 10.3223 3.2952 2,9338 11.181.6 3,8948 ~,9143 I..2129 13.080'/ 11, 79 .7795 2,953.4 11,3.457 3.0182 4.7'142 1~,1348 4.,g'148 12.,395 4,0007 O E P T 3 ,:] 3 g. n 0 ~') 0 .,.,q. F I.,, ti 3I. 60 O 6 T i, n 6.1, 4. $ 3 ,T h ~ 2000.6875 -99g, P'->F)C) CALl -999. -99g.~500 -999,2500