Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-198By Grace Christianson at 12:07 pm, Aug 07, 2025 Digitally signed by Sean McLaughlin (4311) DN: cn=Sean McLaughlin (4311) Date: 2025.08.07 10:41:06 - 08'00' Sean McLaughlin (4311) 325-463 DSR-8/14/25JJL 8/13/25 10-407 *Variance as per 20 AAC 25.112(i): Approved for alternate abandonment plug placement on parentwell contingent upon fully cemented liner on upcoming sidetrack. *Window milling on service coil not approved on 10-403,refer to sidetrack PTD for approval. A.Dewhurst 19AUG25JLC 8/19/2025 Gregory C. Wilson Digitally signed by Gregory C. Wilson Date: 2025.08.20 10:10:27 -08'00'08/20/25 RBDMS JSB 082225 To: Alaska Oil & Gas Conservation Commission From: Trevor Hyatt Drilling Engineer Date: August 7, 2025 Re:S-110B Sundry Request Sundry approval is requested to mill out of the existing shoe in the S-110B wellbore as part of the drilling and completion of the proposed S-110C CTD lateral. Proposed plan: Prior to drilling activities, screening will be conducted to drift/caliper and MIT. E-line or coil will mill the XN-nipple. Coil will mill out of slotted liner shoe pre-rig. If unable to set mill out slotted liner shoe pre-rig, the rig will perform that work. See S-110C PTD request for complete drilling details - A coil tubing drilling sidetrack will be drilled with the Nabors CDR2 or CDR3 rig. The rig will move in, test BOPE and kill the well. If unable to pre-rig, the rig will mill out of the slotted liner shoe with a 3.80" mill + 10' of formation. The well will kick off drilling and lands in the Kuparuk C. The lateral will continue in Kuparuk C, B and A to TD. The proposed sidetrack will be completed with a 3- 1/2"x3-1/4"x2-7/8” L-80 solid liner, cemented in place and selectively perforated post rig (will be perforated with rig if unable to post rig). This completion will completely isolate and abandon the parent Aurora Pool slotted liner. 20 AAC 25.112(i) Variance Request: Hilcorp requests to plug the existing perforations via the liner cement job, packer whipstock and/or liner top packer, if the liner lap pressure test fails as an alternate plug placement. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current wellbore and proposed sidetrack is attached for reference. Pre-Rig Work: (Estimated to start September 2025) 1. Slickline : Dummy WS drift and Caliper 2. Fullbore : MIT-IA and/or MIT-T to 3,100 psi (min) 3. Coil : Mill XN nipple (at 8,578' MD) and mill out slotted liner shoe with 3.80" mill plus 10' rat hole. 4. Valve Shop : Pre-CTD Tree Work 5. Operations : Remove wellhouse and level pad. Rig Work: x Reference S-110C Permit submitted in concert with this request for full details. 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,988 psi). Give AOGCC 24hr notice prior to BOPE test. 2. Mill 3.80” out of slotted liner shoe (if not already done pre-rig) 3. Drill build section: 4.25" OH, ~117' (38 deg DLS planned). 4. Drill production lateral: 4.25" OH, ~2,781' (12 deg DLS planned). Swap to KWF for liner. 5. Run 3-1/2” x 3-1/4” x 2-7/8” L-80 solid liner (swap to VBRs and test prior to running liner) 6. Pump primary cement job*: 38 bbls, 15.3 ppg Class G, 1.24 (ft3/sk), TOC at TOL. Set LTP*. If high losses are encountered during cement job and it is deemed necessary, a cement down squeeze from TOL to loss zone will be performed with the rig or service coil (if performed by service coil see future sundry). 7. Only if not able to do with service coil extended perf post rig – Perforate Liner 8. Freeze protect well to a min 2,200' TVD. 9. Close in tree, RDMO. * Alternate plug placement variance request per 20 AAC 25.112(i) Post Rig Work: 1. Valve Shop : Valve & tree work 2. Slickline : Contingent set LTP. Trevor Hyatt CC: Well File Drilling Engineer Joe Lastufka 907-223-3087 Well Date Quick Test Sub to Otis -1.1 ft Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular 2.75 ft C L Annular 3.40 ft Bottom Annular 4.75 ft CL Blind/Shears 6.09 ft CL 2-3/8" Pipe / Slips 6.95 ft B3 B4 B1 B2 Kill Line Choke Line CL 3.0" Pipe / Slip 9.54 ft CL 2-3/8" Pipe / Slips 10.40 ft TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level 3" LP hose open ended to Flowline CDR2-AC BOP Schematic CDR2 Rig's Drip Pan Fill Line from HF2 Normally Disconnected 3" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2-3/8" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2-3/8" Pipe/Slips 3"or 3-1/8" Pipe / Slip Well Date Quick Test Sub to Otis Top of 7" Otis Top of Annular C L Annular Bottom Annular CL Blind/Shears CL 2-3/8" Pipe / Slips B6 B5 B8 B7 Choke Line Kill Line CL 3" Pipe / Slip CL 2-3/8" Pipe / Slips TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level CDR3-AC BOP Schematic CDR3 Rig's Drip Pan Fill Line Normally Disconnected 2" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2-3/8" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2-3/8" Pipe/Slips 3" Pipe / Slip neceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: (907) 564-4891 02/09/2024 Mr. Mel Rixse Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor through 02/09/2024. Dear Mr. Rixse, Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off with cement, corrosion inhibitor in the surface casing by conductor annulus through 02/09/2024. Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement fallback during the primary surface casing by conductor cement job. The remaining void space between the top of the cement and the top of the conductor is filled with a heavier than water corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached spreadsheets include the well names, API and PTD numbers, treatment dates and volumes. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations. If you have any additional questions, please contact me at 564-4891 or oliver.sternicki@hilcorp.com. Sincerely, Oliver Sternicki Well Integrity Supervisor Hilcorp North Slope, LLC Digitally signed by Oliver Sternicki DN: cn=Oliver Sternicki, c=US, o=Hilcorp North Slope LLC, ou=PBU, email=oliver.sternicki@hilcorp.com Date: 2024.02.09 11:15:58 -09'00' Oliver Sternicki Hilcorp North Slope LLC. Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor Top-off Report of Sundry Operations (10-404) 02/09/2024 Well Name PTD #API # Initial top of cement (ft) Vol. of cement pumped (gal) Final top of cement (ft) Cement top off date Corrosion inhibitor (gal) Corrosion inhibitor/ sealant date L-293 223020 500292374900 30 8/29/2023 S-09A 214097 500292077101 2 9/19/2023 S-102A 223058 500292297201 2 9/19/2023 S-105A 219032 500292297701 10 9/19/2023 S-109 202245 500292313500 7 9/19/2023 S-110B 213198 500292303002 35 9/19/2023 S-113B 202143 500292309402 10 9/19/2023 S-115 202230 500292313000 4 9/19/2023 S-116A 213139 500292318301 4 9/19/2023 S-117 203012 500292313700 3 9/19/2023 S-118 203200 500292318800 9 9/19/2023 S-122 205081 500292326500 5 9/19/2023 S-125 207083 500292336100 2 9/19/2023 S-126 207097 500292336300 3 9/19/2023 S-134 209083 500292341300 35 9/19/2023 S-200A 217125 500292284601 7 9/19/2023 S-202 219120 500292364700 13 9/19/2023 S-210 219057 500292363000 10 9/19/2023 S-213A 204213 500292299301 4 9/19/2023 S-215 202154 500292310700 3 9/19/2023 S-216 200197 500292298900 4 9/19/2023 S-41A 210101 500292264501 3 9/19/2023 W-16A 203100 500292204501 2 9/23/2023 W-17A 205122 500292185601 3 9/23/2023 S-110B 213198 500292303002 35 9/19/2023 Well Name PTD # API # Initial top of cement (ft) Vol. of cement pumped (gal) Final top of cement (ft) Cement top off date Corrosion inhibitor (gal) Corrosion inhibitor/ sealant date W-19B 210065 500292200602 8 9/23/2023 W-21A 201111 500292192901 8 9/23/2023 W-32A 202209 500292197001 4 9/23/2023 W-201 201051 500292300700 44 9/23/2023 W-202 210133 500292343400 6 9/23/2023 W-204 206158 500292333300 3 9/23/2023 W-205 203116 500292316500 3 9/23/2023 W-207 203049 500292314500 3 9/23/2023 W-211 202075 500292308000 8 9/23/2023 W-213 207051 500292335400 3 9/23/2023 W-214 207142 500292337300 10 9/23/2023 W-215 203131 500292317200 2 9/23/2023 W-223 211006 500292344000 7 9/23/2023 Z-69 212076 500292347100 2.0 27 1.5 10/24/2023 S-128 210159 500292343600 11 12/27/2023 S-135 213202 500292350800 16 12/27/2023 V-113 202216 500292312500 24 12/31/2023 V-114A 203185 500292317801 5 12/31/2023 V-122 206147 500292332800 5 12/31/2023 V-205 206180 500292333800 2 12/31/2023 V-207 208066 500292339000 8 12/31/2023 V-214 205134 500292327500 5 12/31/2023 V-215 207041 500292335100 2 12/31/2023 V-218 207040 500292335000 5 12/31/2023 V-224 208154 500292340000 16 12/31/2023 V-225 209118 500292341900 6 12/31/2023 V-01 204090 500292321000 3 1/1/2024 V-02 204077 500292320900 5 1/1/2024 V-04 206134 500292332200 5 1/1/2024 V-102 202033 500292307000 8 1/1/2024 V-104 202142 500292310300 5 1/1/2024 V-220 208020 500292338300 4 1/1/2024 Nolan Vlahovich Hilcorp North Slope, LLC Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Hilcorp North Slope, LLC Date: 12/20/2023 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL WELL: PBU S-110B PTD: 213-198 API: 50-029-23030-02-00 MSIL Logs from 7/14/23 Field Print Final Print Well Bore Diagram LAS Files SFTP Transfer - Data Folders: Please include current contact information if different from above. PTD: 213-198 T38235 12/21/2023Kayla Junke Digitally signed by Kayla Junke Date: 2023.12.21 08:58:07 -09'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Wednesday, April 5, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Austin McLeod P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC S-110B PRUDHOE BAY UN AURO S-110B Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 04/05/2023 S-110B 50-029-23030-02-00 213-198-0 W SPT 6691 2131980 1673 2074 2076 2074 2074 202 384 325 295 4YRTST P Austin McLeod 3/5/2023 MITIA 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UN AURO S- 110B Inspection Date: Tubing OA Packer Depth 233 2708 2646 2635IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSAM230305193711 BBL Pumped:1.5 BBL Returned:1.5 Wednesday, April 5, 2023 Page 1 of 1          MEMORANDUM State of Alaska Depth Pretest Initial Alaska Oil and Gas Conservation Commission TO: Jim Re 3'�II DATE: Tuesday, March 19, 2019 / P.I. Supervisor1 �� SUBJECT: Mechanical Integrity Tests 3010 -T 301' - BP EXPLORATION (ALASKA) INC. FROM: Guy Cook S -I IOB 2488 - 2476 PRUDHOE BAY ON AURO S-11013 Petroleum Inspector 2.5 " B13L Returned: L5 Sre: Inspector Reviewed By:� 327- 293 - P.1. Supry T• -^Q NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UN AURO S- � API Well Number 50-029-23030-02-00 Inspector Name: Guy Cook I10D Insp Num: mi[GDCI90315154105 Permit Number: 213-198-0 Inspection Date: 3/13/2019 Rel Insp Num: Tuesday, March 19, 2019 Page I of 1 Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well s-iiola Type Inj TVD 6691 " Tubing 3001 - 3o0a" 3010 -T 301' - PTD ;los0 TypeTest SI'f 'rest psi 1673 •i IA 21 2534 - 2488 - 2476 BBI. Pumpers: 2.5 " B13L Returned: L5 OA 189 �- 366 327- 293 - Interval 4YRTST . P/F P Notes: Well was shut .. in for it's four year cycle testing time. Testing was done with a triplex pump and bleed trailer. All gauges were current on calibration. Tuesday, March 19, 2019 Page I of 1 Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWeliSiteEnginee@bp.com> Sent: Thursday, February 14, 2019 7:43 AM To: AK, OPS EOC Specialists; Ak, OPS GC2 Facility PTL; Ak, OPS GC2 Field PTL; AK, OPS GC2 OSM; AK, OPS GC2 Wellpad Lead; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; AK, OPS Well Pad DFT N2; AK, OPS Well Pad HUQ AK, OPS Well Pad LV; AK, OPS Well Pad MN; AK, OPS Well Pad RJ; AK, OPS WELL PAD S; AK, OPS Well Pad SW, AK, OPS WELL PAD W, AK, OPS Well Pad Z; Ak, Ops West Area TL; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AKOpsProdEOCTL; Draughon, Austin; Duong, Lea; Nottingham, Derek; Peru, Cale; Thompson, Ryan; Wellman, Julie; Youngmun, Alex; Wallace, Chris D (DOA) Cc: AK, GWO Completions Well Integrity, AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity; AK, GWO SUPT Well Integrity, AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey, Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R; Tempel, Joshua; Worthington, Aras 1; Regg, James B (DOA) Subject: OPERABLE: Injector S-1108 (PTD #2131980) Ready to be brought online for AOGCC MIT -IA All, Injector S-1108 (PTD #2131980) was made not operable on 4/30/2018 for lapsing on its 4 year AOGCC witnessed MIT - IA. The well is now be ready to be brought online and is reclassified as Operable at this time. An AOGCC witnessed MIT -IA will be performed once the well is on stable injection. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 From: AK, GWO We tegrity Engineer Sent: Monday, April 30, 2 6:01 AM To:'chris.wallace@alaska.gov' <c wallace@alaska.gov>; AK, OPS EOC Specialists <AKOPSEOCSpecialists@bp.com>; AK, OPS GC2 Facility OTL <AKOPSGC2Fac ' TL@bp.com>; AK, OPS GC2 Field O&M TL <AKOPSGC2FieldOMTL1@bp.com>; AK, OPS GC<AKOPSGC20SM@bp.com>; AK, OPS GC2 Wellpad Lead <AKOPSGC2WeIIpadLead @bp.com>; AK, OPS PCC Ops Le <AKOPSPCCOpsLead@bp.com>; AK, OPS Prod Controllers <akopsprodcontrollersl@bp.com>; AK, OPS Well Pad HUQ <AKO ellPadHUQ@bp.com>; AK, OPS Well Pad LV <AKOPSWe11Pad LV@bp.com>; AK, OPS Well Pad MN <AKOPSWellPadMN com>; AK, OPS Well Pad RJ <AKOPSWeliPadRJ@bp.com>; AK, OPS WELL PAD S <AKOPSWELLPADS@bp.com>; OPS Well Pad SW <AKOPSWeliPadSW@bp.com>; AK, OPS WELL PAD W <AKOPSWELLPADW@bp.com>; AK, Well Pad Z <AKOPSWellPadZ@bp.com>; Ak, Ops West Area TL <AkOpsWestAreaTL@bp.com>; AK, RES GPB tastWells Opt Engr • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Monday,April 30, 2018 6:01 AM To: Wallace, Chris D (DOA);AK, OPS EOC Specialists;AK, OPS GC2 Facility OIL;AK, OPS GC2 Field O&M IL;AK, OPS GC2 OSM;AK, OPS GC2 Wellpad Lead;AK, OPS PCC Ops Lead; AK, OPS Prod Controllers;AK, OPS Well Pad HUQ;AK, OPS Well Pad LV;AK, OPS Well Pad MN;AK, OPS Well Pad RJ;AK, OPS WELL PAD S;AK, OPS Well Pad SW;AK, OPS WELL PAD W;AK, OPS Well Pad Z;Ak, Ops West Area TL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOp5ProdEOCTL; Bergene, Matthew; Draughon,Austin; Frankenburg,Amy; Peru, Cale; Rupert, C. Ryan; Shriver, Tyson; Wellman,Julie;Youngmun,Alex;Zoesch, Eric Cc: Regg,James B (DOA);AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J Subject: NOT OPERABLE: Injector S-110B (PTD#2131980)will lapse on AOGCC MIT-IA All, Injector S-1108(PTD#2131980) is currently shut in and is due for its AOGCC required 4 year MIT-IA by the end of April, 2018.There are no immediate plans to bring this well online.The well is now classified as NOT OPERABLE. Once injection resumes,an AOGCC witnessed MIT-IA will be scheduled. Please respond with any questions. Andrew Ogg Well Integrity Engineer BP Global Wells Organization-Alaska SCAN Office:907-659-8110 SCANNED 1