HomeMy WebLinkAbout185-008 RECEIVED
STATE OF ALASKA �
` AL OIL AND GAS CONSERVATION COMM ION A! ir1 0 7 2012 *. f "
REPORT OF SUNDRY WELL OPERATIONS AOGCC '
1. Operations Abandon Repair Well Plug Perforations ■ Perforate ■ Other ! r• t,
Performed: Alter Casing ❑ Pull Tubing H Stimulate - Frac ❑ Waiver ❑ Time Extension I♦
Change Approved Program ❑ Operat. Shutdown ❑ Stimulate - Other ❑ Re -enter Suspended Well ❑
2. Operator 4. Well Class Before Work: 5. Permit to Drill Number:
Name: BP Exploration (Alaska), Inc
Development ❑ Exploratory ❑ 185 -008 -0
3. Address: P.O. Box 196612 Stratigraphic ❑ Service 5 6. API Number:
Anchorage, AK 99519 -6612 50- 029 - 21271 -00 -00
7. Property Designation (Lease Number): 8. Well Name and Number:
ADL0047437 MPCFP -1
9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): .
To Be Submitted MILNE POINT, TERTI UNDEF WTRSP
11. Present Well Condition Summary:
Total Depth measured 3601 feet Plugs measured None feet
true vertical 3429.66 feet Junk measured None feet
Effective Depth measured 3505 feet Packer measured 2676 feet
true vertical 3336.58 feet true vertical 2544.28 feet
Casing Length Size MD TVD Burst Collapse
Structural None None None None None None
Conductor 80 20" 94# H -40 35 - 115 35 - 115 1530 520
Surface 2672 10 -3/4" 45.5# L -80 36 - 2708 36 - 2708 5210 2480
Intermediate None None None None None None
Production 4059 9 -5/8" 36# K -55 31 - 4090 31 - 3903.76 3520 2020
Liner None None None None None None
Perforation depth Measured depth See Attachment feet t�
True Vertical depth See Attachment feet 5. A U G 1 � I" .
Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment
Packers and SSSV (type, measured and true vertical depth) Baker SC - 1A Gravel 2676 2544.28 Packer
Pack Assembly with
Baker Model 'D'
Sump Paker
None None None SSSV
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
14. Attachments: 15. Well Class after work:
Copies of Logs and Surveys Run Exploratory ❑ Development ❑ Service 0 Stratigraphic ❑
Daily Report of Well Operations X 16. Well Status after work: Oil ❑ Gas ❑ WDSPL 5
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG ❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Nita Summerhays Prepared by Nita Summerhays 564 -4035
Printed Name Nita Summ ay= Title Petrotechnical Data Technician
r
Signatu i..., -se 7,4,4,70 Phone 564 -4035 Date 8/7/2012
•,,t. II L!L�1!..: r- .i•irIIIF41l1I ■ - - ■■■...._ . _ II I• •
'"' ,151Y4 AUG 0 9 2012 rlii I
•
Daily Report of Well Operations
ADL0047437
AC M ®A '' , .•
T /I /0= 50150/85 Load and kill [Furmanite prep] Rigged up to Tree cap and pumped 5 bbls
neat meth, 130 bbls 100* 1% KCL, 3 bbls 60/40 meth down Tubing. Pumped 45 bbls 60/40 meth
down F/L to freeze protect. Rigged up to IA and pumped 5 bbls neat meth, 283 bbls 1% KCL, 3
5/29/2012 bbls 60/40 meth clown IA. FWHP's = 18/15/119. Swab, Master, Lateral = shut. IA, OA = open.
T /I /0 = 20/10/60. Well Kill. Pumped 5bbls 60740, 87bbls 6% KCI, 30bbls 60/40 down tubing.
5/30/2012 Pumped 5bbls 60/40, 215bbIs 6% KCI, 3bbls 60/40 down tubing. FWHP's = 70 /vac /64
T /I /0 = ? ?/0/40. Temp = SL Assist Furmanite (open OA bleed). No ladder /scaffolding to access
swab valve. See log for details. CCI sandblasted SH. Furmanite installed E -glass layer of
composite wrap. Bled OAP to 0 psi in 5 min (all gas). Maintained open bleed for 4 hrs. Turned
6/1/2012 well over to MPU Wells Support. Job incomplete.
6/2/2012 SH Furmanite base wraps (4) of carbon fiber material completed.
171 /0 = ? ? /vac/0. Temp = SI. Assist Furmanite. Furmanite installed 2nd layer of carbon fiber
6/3/2012 wrap. See log for details. Held open bleed on OA for 17 hrs. ** Job ongoing. **
T71 /0 = ? ? /vac/0. Temp = Si. Assist Furmanite. Furmanite installed 4th layer of carbon fiber wrap.
Ladder and swab platform removed. Unable to access Swab valve. See log for details. Held open
6/5/2012 bleed on OA for 24 hrs. ** Job ongoing. **
171/0 = ?? /vac /0. Temp = SI. Assist Furmanite. Furmanite installed 4th layer of carbon fiber wrap.
6/5/2012 See log for details. Held open bleed on OA for 24 hrs. ** Job ongoing. **
T /I /0 = ?? /vac /0. Temp = SI. Assist Furmanite. Furmanite installed 5th layer of carbon fiber wrap.
Ladder and swab platform removed. Unable to access Swab valve. See log for details. Held open
6/6/2012 bleed on OA for 24 hrs. ** Job ongoing. **
- T/I/0 = ? ? /vac/0. Temp = SI. Assist Furmanite. Furmanite installed 4th layer of carbon fiber wrap.
Ladder and swab platform removed. Unable to access Swab valve. See log for details. Held open
6/6/2012 bleed on OA for 24 hrs. ** Job ongoing. **
171 /0 = ?? /vac /0. Temp = ST. Assist Furmanite. Furmanite installed 5th layer of carbon fiber wrap.
Ladder and swab platform removed. Unable to access Swab valve. See log for details. Held open
6/6/2012 bleed on OA for 24 hrs. ** Job ongoing. **
171/0 = ? ? /vac/0. Temp = 51. Assist Furmanite. Furmanite installed 4th layer of carbon fiber wrap.
Ladder and swab platform removed. Unable to access Swab valve. See log for details. Held open
6/6/2012 bleed on OA for 24 hrs. ** Job ongoing. **
- T/I/0 = ?? / vac /0. Temp = SI. Assist Furmanite. Furmanite installed 6th layer of carbon fiber wrap.
Ladder and swab platform removed. Unable to access Swab valve. See log for details. Held open
6/7/2012 bleed on OA for 24 hrs. ** Job ongoing. **
171/0 = ? ? /vac/0. Temp = Sl. Assist Furmanite. Furmanite installed final layer of carbon fiber
wrap. Ladder and swab platform removed. Unable to access Swab valve. See log for details.
6/8/2012 Held open bleed on OA for 24 hrs. ** Job ongoing. **
T /I /0 = ?? /vac /0. Temp = SI. Assist Furmanite. Ladder and swab platform removed. Unable to
6/9/2012 access Swab valve. See log for details. Held open bleed on OA for 24 hrs. ** Job ongoing. **
T /I /0 = ? ? /vac/0. Temp = SI. Assist Furmanite. Ladder and swab platform removed. Unable to
6/10/2012 access Swab valve. See log for details. Held open bleed on OA for 24 hrs. ** Job ongoing. **
T /I /0 = ?? /vac /0. Temp = SI. Assist Furmanite. Ladder and swab platform removed. Unable to
6/11/2012 access Swab valve. See log for details. Held open bleed on OA for 24 hrs. ** Job ongoing. **
T /I /O = ? ? /vac/0. Temp = SI. Assist Furmanite. Ladder and swab platform removed. Unable to
access Swab valve. See log for details. Held open bleed on OA for 12 hrs. Well in control of Milne
6/12/2012 PT Wells Support.
Z /I /O = ?? /vac /0. Temp = Assist Furmanite. Ladder and swab platform removed. Unable to
access Swab valve. See log for details. Held open bleed on OA for 12 hrs. Well in control of Milne
6/12/2012 PT Wells Support.
T /I/O = ? ? /vac/0. Temp = SI. Assist Furmanite. Ladder and swab platform removed. Unable to
access Master & Swab valves. See log for details. Held open bleed on OA for 24 hrs. ** Job
6/13/2012 ongoing. **
• •
T /I/O = ?? /vac /0. Temp = Si. Assist Furmanite. Ladder and swab platform removed. Unable to
access Master & Swab valves. See log for details. Held open bleed on OA for 24 hrs. ** Job
6/14/2012 ongoing.**
171 /0 = ? ? /vac/0. Temp = St. Assist Furmanite. Ladder and swab platform removed. Unable to
access Master & Swab valves. See log for details. Held open bleed on OA for 24 hrs. ** Job
6/15/2012 ongoing. **
f /I /O = ? ? /vac/0. Temp = Sf. Assist I- urmanite. Ladder and swab platform removed. Unable to
access Master & Swab valves. See log for details. Held open bleed on OA for 24 hrs. 5:10 PM,
PE called Job is Complete. SI bleed & rig down. Final WHP's = ? ?Nac/0.
Job Complete.
6/16/2012 SV = ?? (no access). MV = C. No SSV. IA & OA = OTG. NOVP. 18:00.
T /I /O= ? ?NacI3.. Temp =Sl. MI f -OA PASS to 1200 psi (post I- urmanite wrap). OA I-L near
surface. Pumped 2.67 bbl to reach test pressure of 1200 psi. Lost 95 psi in 1st 15 min and 20 in
2nd 15 min for a total of 115 psi in 30 min. No signs of leaks on Furmanite wrap. Bled OA to 0 psi
(1 bbl). Final WHPs= ? ?Nac/0. Job complete.
6/23/2012 SV = ? ?. MV =C. No WV. No SSV. IA &OA =OTG. NOVP. 1430.
FLUIDS PUMPED
BBLS
2.67 DIESEL
413 1 %KCL
302 6% KCL
49 60/40 METH
10 METH
776.67 TOTAL
• •
Perforation Attachment
ADL0047437
Perf
Opera Meas Meas
Operation tion Depth Depth TVD Depth TVD Depth
SW Name Date Code Top Base Top Base
MPCFP -1 11/17/85 PER 2905 2925 2758.15 2777.16
MPCFP -1 11/17/85 PER 2940 2975 2731.43 2764.79
MPCFP -1 11/17/85 PER 3020 3030 2807.79 2817.37
MPCFP -1 11/17/85 PER 3085 3110 2870.19 2894.28
MPCFP -1 11/17/85 PER 3145 3205 2928.04 2986.05
MPCFP -1 11/17/85 PER 3220 3310 3000.56 3087.6
AB ABANDONED MIR REMOVED
APF ADD PERF MIS MECHANICAL ISOLATED
BPP PULLED MLK MECHANICAL LEAK
BRIDGE OPEN
BPS PLUG SET OH HOLE
FCO FILL CLEAN OUT STC STRADDLE PACK, CLOSED
FIL FILL STO STRADDLE PACK, OPEN
SQF SQUEEZE FAILED SPS SAND PLUG SET
SQZ SQUEEZE SL SLOTTED LINER
PER PERF SPR SAND PLUG REMOVED
RPF REPERF
t - WSW CIW 3 1/8" 5M MPU CFP -01 WSW Orig. B elev. = 50.0' (N 27E)
Wellhead: 3 1/8" X 13-5/8" 3M FMC. Orig. GL lev. = 26.0'
Tbg hanger: TC -B -EC, 13 5/8 X 3 1/2" /
NSCT T &B, w/ 300 -4 Pkt., 3" CIW -H BPV
NOTE: Tree cap is s regular 4 -1/2" /
Otis with hammer up cover. 0 '
0 3 1/2" 9.3 ppf Pup Joint
20" 94 #/ft , H -40 pelp set 80' 5
13 -3/8" 72 #/ft , L -80 btrc 2 186' 0 i 3-1/2" X 4-1/2" X -Over 27'
/ f
Centrilift Cable % Min. tubing restriction = 2.750"
at XN nipple
KOP @ 800'
Max. hole angle= 30 deg. f/ 2100' - TD 0
Hole angle through perfs = 32 deg. 0
0 4 1/2" X 3 -1/2" XN- Nipple 2395'
3.5 ", 9.3 # /ft, L -80, NSCT X TCII Pup (2.813 X 2.75" no -go id )
(cap. = 0.0087 bpf, drift = 2.867 ")
4.5 ", 12.75 #/ft , L -80, BTRS tubing A~
(cap. = 0.0152 bpf, drift = 3.833 ") Centrilift HC 10000 ESP, 2449'
0='„. , series 675, 23 Stg HPITAR 1:1
9 5/8" 36 ppf, K -55, BTRS, Casing r
(cap w/ 4 1/2 tbg = 0.0536 bpf) 0 '
i ? Centrilift Tandem Seal Sectior 2461'
1 % 0 . 4111111 Series 675 HSTILDBINVPFSCL5
0
/ / < Centrilift Motor, 562 Series, KMH 2475'
266 hp. motor, 2345v / 69 amp
9 5/8" Baker SC -1 a 2,676'
gravelpkr.
Perforation Summary: 5 1/2" 17# Blank Pipe
— 7, - Top of Gravel Pack Screen 2,858'
j 5 1/2 ", 17# 12 gage wire
Size SPF Interval (TVD) — wrapped scr. ( 4.892 "id , 5.09 "od )
5 12 2,905' - 2,925' — —
5 12 2,940' - 2,975' 0-Ring seal sub w/ 39.23" 3,233'
5 12 3,020' 3,030' — - Tell -Tale 12 gage scr.
5 12 3,085' - 3,110'
5 12 3,145' 3,205' � �� Baker Model " D" sump pkr. 3,331'
5 12 3,220' - 3,310'
5" Hollow Carrier 12 -SPF
w/ 120 deg. phasing Float collar (PBTD) 3505'
9.625" csg. shoe 3590'
DATE REV. BY COMMENTS MILNE POINT UNIT
11/1785 Drilled and Cased Completed WELL CFP - WSW
06/10/90 ESP Completion API NO: 50 - 029 - 21271
05/11/96 MDO Recompletion by Nabors 4ES
12/7/03 Lee Hulme Recompletion by Nabors 4ES BP EXPLORATION (AK)
( STATE OF ALASKA {
, ALASKA lJlL AND GAS CONSERVATION COft'j,,,IISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed:
0 Abandon 0 Suspend 0 Operation Shutdown 0 Perforate 0 Waiver 0 Other
0 Alter Casing a Repair Well 0 Plug Perforations 0 Stimulate 0 Time Extension
0 ChanQe Approved ProQram a Pull Tubinq 0 Perforate New Pool 0 Re-Enter Suspended Well 0 Annular Disposal
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. 0 Development 0 Explorator) 185-008
3. Address: 0 Stratigraphic Test 181 Service 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21271-00-00
7. KB Elevation (ft): KBE = 60' 9, Well Name and Number:
MPCFP-1
8. Property Designation: 10. Field 1 Pool(s):
ADL 047437 Milne Point Unit 1 Kuparuk River Sands
11. Present well condition summary
Total depth: measured 3601 feet
true vertical 3430 feet Plugs (measured) N/A
Effective depth: measured 3505 feet Junk (measured) N/A
true vertical 3337 feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 80' 20" 115' 115'
Surface 2150' 13-3/8" 2186'
Intermediate
P.roduction 3556' 9-5/8" 3590' RECEIVED
Liner
JAN 1 6 2004
. , , A'aska Oil & Gas Cons. Commission
Perforation Depth MD (ft): 2905 - 3310 Anchorage
Perforation Depth TVD (ft): 2758' - 3148'
Tubing Size (size, grade, and measured depth): 3-1/2" x 4-1/2",9.3# x 12.6# L-80 2497'
Packers and SSSV (type and measured depth): 9-5/8" Baker SC-1A Gravel Pack Assembly with Baker 2676' - 3331'
Model'D' Sump Packer
12. Stimulation or cement squeeze summary: N/A
Intervals treated (measured):
Treatment description including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casina Pressure Tubina Pressure
Prior to well operation:
Subsequent to operation:
14. Attachments: 0 Copies of Logs and Surveys run 15. Well Class after proposed work:
a D 'I R rt f W II 0 t. 0 Exploratory 0 Development IBI Service
!all al y epo 0 e pera Ions
a W II S h t' D' 16. Well Status after proposed work: '\I'-.\A~-Pù~ ~\(\pL~I..
!all e c ema IC lag ram 1-' .
0 Oil 0 Gas 0 WAG 0 GINJ 0 WINJ . DSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUndry Number or N/A if C.O. Exempt:
Contact David Reem, 564-5743 N/A
Printed Name Sondra Stewman Title Technical Assistant
.r-: ~i . de"" -<. " '. '.. _I 1 Prepared By Name/Number:
Signé!ture..~..f1l.J ~ p. ~,~ "- Phone 564-4750 DateD t "l.z¡-o~ Sondra Stewman, 564-4750
Form 10-404 Revised æ~~Er) .IA\II 2 @ 2004 0 RIG I N A L ]~~ 202M
Tree: CIW 3 1/8" 5M CFP-01 Orig( . elev. = 50.0' (N 27E)
Wellhead: 3 1/8" X 13-5/8" 3M FMC. Orig. GL lev. = 26.0'
Tbg hanger: TC-B-EC, 13518 X 31/2"
NSCT T&B, wi 300-4 Pkt., 3" CIW-H BPVT.
. t ¡ 3 1/2" 9.3 ppf Pup Joint
20" 94 #/ft.. H-40 pelp set It"""8; I
I I
13-3/8" 72#/ft , L-80 btrc I 2,186' I 3-1/2" X 4-1/2" X-Over 27'
Centrilift Cable Min. tubing. restriction = 2.750"
at XNnipple
KOP @ 800'
Max. hole angle= 30 deg. fI 21 DO' - TD
Hole angle through perfs = 32 deg.
4 1/2" X 3-1/2" XN-Nipple I 2395' I
3.5", 9.3 #/ft, L-80, NSCT X TCII Pup (2.813 X 2.75" no-go id )
(cap. = 0.0087 bpf, drift = 2.867")
4.5",12.75 #/ft , L-80, BTRS tubing Centrilift HC 10000 ESP, I I
(cap. = 0.0152 bpf, drift = 3.833") 2449'
series 675, 23 Stg HPITAR 1:1
95/8" 36 ppf, K-55, BTRS, Casing
(cap w/4 1/2 tbg = 0.0536 bpf)
Centrilift Tandem Seal sectionl 2461' I
Series 675 HSTILDBINVPFSCL5
Centrilift Motor, 562 Series, KMH I ~ I
266 hp. motor, 2345v I 69 amp a4qì J
9 5/8" Baker SC-1 a I 2,676' I
gravelpkr.
Perforation Summary: 51/2" 17# Blank Pipe I
Top of Gravel Pack Screen I 2,858'
(TVD) 5 1/2", 17# 12 gage wire
Size SP Interval wrapped scr. ( 4.892"id, 5.09"od)
5 12 2,905' - 2,925' O-Ring seal sub wI 39.23" I 3,233' I
5 12 2,940' - 2,975'
5 12 3,020' - 3,030' Tell-Tale 12 gage scr.
5 12 3,085' - 3,110'
5 12 3,145' - 3,205' Baker Model" D" sump pkr. I 3,331' I
5 12 3,220' - 3,310'
5" Hollow Carrier 12-SPF I 3505' I
wI 120 deg. phasing ........................................ Float collar (PBTD)
...n',"'"''''''''''''''''''''''''.'''
...........................,............
.........,.............................. I 3590' I
........................................
--.,.,.................................. 9.625" csg. shoe
DATE REV. BY COMMENTS MILNE POINT UNIT
11/1785 Drilled and Cased Completed WELL CFP-01 WSW
06/1 0190 ESP Completion API NO: 50-029-21271
05/11/96 MDO Recompletion by Nabors 4ES
12/7/03 Lee Hulme Recompletion by Nabors 4ES BP EXPLORATION AK
( (
BP Exploration Page 1 of 2
Operations Summary Report
Legal Well Name: MPCFP-1
Common Well Name: MPCFP-1 Spud Date: 1/21/1985
Event Name: WORKOVER Start: 12/5/2003 End: 12/7/2003
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/7/2003
Rig Name: NABORS 4ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
12/5/2003 06:00 - 08:30 2.50 MOB P PRE RDMO from MPH-14.
08:30 - 09:30 1.00 MOB P PRE Move Rig and Equipment from MPH-Pad to MP CFP-1.
09:30 - 12:00 2.50 RIGU P PRE Spot Sub Base over Well. Spot Pipe Shed, and Pits. Spot Rig
Camp. Order out Handling Equipment and XOs to handle 2
3/8" CS Hy-drill.
12:00 - 14:00 2.00 RIGU P DECOMP Take on first load of 120 deg F. Sea Water. Hook up lines to
Tiger Tank. Accept Rig at 12:00 hrs.
14:00 - 15:00 1.00 WHSUR P DECOMP M/U lubricator & pull BPV. LID lubricator.
15:00 - 15:30 0.50 PULL P DECOMP Hold PJSM & Pre-spud meeting wI crew.
15:30 - 16:30 1.00 WHSUR P DECOMP Pressure test pack off. Tested good.
16:30 - 17:00 0.50 WHSUR P DECOMP Pressure test circulating lines to 1500 psi, OK.
17:00 - 19:00 2.00 KILL P DECOMP Circulate out freeze proection fluid to Tiger tanks. 3 BPM @
450 psi down 2 3/8" tubing. Circulated 2 annular volumes.
19:00 - 20:00 1.00 KILL P DECOMP Pressure test annulus to 1500 psi for 30 min. Bled off 100 psi
in 30 min.
20:00 - 22:00 2.00 KILL P DECOMP Bullhead down 4 1/2" tubing wI 108 Bbls of seawater. Pumped
4 BPM @ 350 psi.
22:00 - 22:30 0.50 WHSUB P DECOMP Re-pressure test annulus to 1500 psi for 30 min. Bled off 100
psi in 30 min. Test is good.
22:30 - 23:30 1.00 WHSUR P DECOMP Set TWC & test to 1500 psi. Monitor annulus, annulus dead.
23:30 - 00:00 0.50 WHSUR P DECOMP Bled off tubing head void. NID X-mas tree.
12/6/2003 00:00 - 01 :00 1.00 WHSUR P DECOMP Finish N/D X-mas tree.
01 :00 - 03:00 2.00 BOPSU¡:; P DECOMP N/U BOPE.
03:00 - 04:00 1.00 BOPSU¡:; P DECOMP Perform body test on BOPE to 1500 psi.
04:00 - 05:00 1.00 WHSUR P DECOMP M/U lubricator & pull TWC. LID lubricator.
05:00 - 05:30 0.50 PULL P DECOMP M/U landing jt. Pull 2 3/8" CS Hydril tubing to floor. P/U 25K.
05:30 - 07:30 2.00 PULL P DECOMP POOH & LID 2 3/8", 4.6 Ib/tt, L-80, CS Hydril Tbg. Recovered
a total of 64 Jts and a perforated Bull Plug.
07:30 - 08:30 1.00 PULL P DECOMP Lay down 2 3/8" handling equipment. Pick up 4 1/2" handling
equipment.
08:30 - 09:30 1.00 WHSUR P DECOMP Pick-up Landing Jt. BOLDS. Pulled Hanger free at 45K.
Shear release Halco Packer at 86K. String moving free at 42K.
09:30 - 10:00 0.50 KILL P DECOMP Circulate Bottoms Up. Very small amount of gas to surface.
Mont Well. Fluid level dropping.
10:00 - 13:00 3.00 PULL P DECOMP POOH with 41/2" Tbg to 3 1/2" Tbg. Recovered 69 Jts of 4
1/2" BTRS and 10 Jts of 41/2" 8rd. Lay down 41/2" Handling
Equipment. Pick up 3 1/2" Handling Equipment.
13:00 - 17:00 4.00 PULL P DECOMP Lay down 3 1/2" Tbg, Pup Jts, and Halco 9 5/8" Pkr.
17:00 - 19:30 2.50 PULL P DECOMP Clear & clean rig floor. LID elephant trunck. R/U to P/U DCs &
storm packer.
19:30 - 21 :30 2.00 WHSUR P DECOMP P/U & RIH wI 7 DCs & storm packer. Set packer @ 25' below
RTKB.
21 :30 - 23:00 1.50 BOPSU¡:; P DECOMP NID BOP stack.
23:00 - 00:00 1.00 WHSUR P DECOMP NID tubing spool. Bolts corroded. Had to break several free.
Inspect casing stub, good.
12/7/2003 00:00 - 00:30 0.50 WHSUR P DECOMP Finish NID tubing spool. N/U new tubing spool.
00:30 - 02:00 1.50 BOPSU¡:; P DECOMP N/U BOPE. Test tubing spool to 3000 psi, Ok.
02:00 - 02:30 0.50 BOPSU¡:; P DECOMP Perform body test on BOP to 2500 psi, OK.
02:30 - 04:00 1.50 WHSUR P DECOMP Unset storm packer & POOH. LID packer & 7* 43/4" DCs.
04:00 - 04:30 0.50 RUNCO~ ~ COMP Clear & clean rig floor. R/U to P/U ESP.
04:30 - 08:30 4.00 RUNCO~ P COMP P/U, M/U & service ESP. Attach ESP Cable to Motor. Test.
08:30 - 12:00 3.50 RUNCO~ P COMP Run ESP Completion and 4 1/2" Tbg as follows: ESP
Assembly, XO, Pup Jt, 1 Jt, XN-Nipple, 39 jts Tbg (all new
Printed: 12/8/2003 11: 08:26 AM
( (
BP Exploration Page 2 of 2
Operations Summary Report
Legal Well Name: MPCFP-1
Common Well Name: MPCFP-1 Spud Date: 1/21/1985
Event Name: WORKOVER Start: 12/5/2003 End: 12/7/2003
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/7/2003
Rig Name: NABORS 4ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
12/7/2003 08:30 - 12:00 3.50 RUNCOI\,p COMP equip, tubing, pup jt, and nipple) 26 jts Tbg (re-run tbg), XO,
and XO Pup Jt. 138 bands.
12:00 - 13:00 1.00 RUNCOI\,p COMP Pick-up Landing Jt.. Make-up Tbg Habger and install
Penetrator.
13:00 - 15:30 2.50 RUNCOI\f'p COMP Make-up bottom ESP Cable connector. Test.
15:30 - 16:00 0.50 RUNCOI\f'p COMP Land Tbg Hanger with bottom of ESP Assy at 2,497 -ft. RILDS.
P/U wt 42K, S/O wt 42K. Blow down lines.
16:00 - 17:00 1.00 BOPSUF P COMP NID BOPE.
17:00 - 18:00 1.00 WHSUR P COMP N/U adapter flange & X-mas tree.
18:00 - 18:30 0.50 WHSUR P COMP Pressure test void & tree to 5000 psi, OK.
18:30 - 19:00 0.50 WHSUR P COMP M/U lubricator & pull TWC. Insatll BPV. LID lubricator. Secure
Cellar.
19:00 - 00:00 5.00 DEMOB P POST Release Rig at 19:00 hrs. RDMO to MPJ-09.
Printed: 12/8/2003 11 :08:26 AM
STATE OF ALASKA '-"~
ALASKA~,,L AND GAS CONSERVATION CO~vIMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: []Operation Shutdown []Stimulate [] Plugging [] Perforate
[] Pull Tubing []Alter Casing [] Repair Well [] Other ESP Replacement
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
303' NSL, 2075' WEL, Sec. 24, T13N, R10E, UM
At top of productive interval
227' NSL, 2753' WEL, Sec. 24, T13N, R10E, UM
At effective depth
243' NSL, 2916' WEL, Sec. 24, T13N, R10E, UM
At total depth
248' NSL, 2935' WEL, Sec. 24, T13N, R10E, UM
5. Type of well: [] Development
[] Exploratory
[] Stratigraphic
[] Service
6. Datum Elevation (DF or KI3E)
KBE = 50'
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPCFP-1
9. Permit Number / Approval No.
85-8
10. APl Number
50- 029-21271
11. Field and Pool
Kuparuk River Field
12. Present well condition summary
Total depth: measured 3505' feet
true vertical 3277' feet
Effective depth: measured 3590' feet
true vertical 3359' feet
Casing Length
Structural
Conductor
Surface
Intermediate
Production
Liner
Plugs (measured)
Junk (measured)
Size Cemented MD TVD
80' 16" To surface 115' 115'
2150' 9 5/8" 502 Bbls 2186' 2048'
3556' 7" 250 sx$ 3590' 3359'
Perforation depth: measured
true vertical
Tubing (size, grade, and measured depth)
2698'-2717', 2732'-2765', 2808'-2817', 2870'-2894', 2928'-2986', 3010'-3088' '
u :..-., ?.9.99
A/~ ~...
--s.~ Cfi,5
4 112" 13~ L-80 to 2495'
Packers and SSV (type and measured depth) 9 5/8 X 3 1/2 HES "RDH" ESP pkr @ 2388', 9 5/8" Baker SC-la gravel pkr @
2676' & Baker Model "D" sump pkr @ 3331'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
ORIGINAL
14.
Prior to well operation:
Subsequent to operation:
Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl
Casing Pressure
Tubing Pressure
15. Attachments [] Copies of Logs and Surveys run
[] Daily Report of Well Operations
16. Status of well classifications as:
[] Oil [] Gas [] Suspended
Service Water Supply Well
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Chip Alvord ~~'~ Title Engineering Supervisor Date
Prepared By Name/Number: Mary Youngers 564-5242
Form 10-404 Rev. 06/15/88
Submit In Duplic,~
SUMMARY OF DALLY OPERATIONS
SHARED SERVICES DRILLING - BPX / ARCO
Well Name: MPCFP-1 Rig Name: N-4ES AFE# 339009
Accept Date: 05/08/96 Spud Date: . Release Date: 05/13/96
MAY 09, 1996
RIG ACCEPTED @ 10:00 SCOPE & PIN DERRICK, BERM, RIG TIGER TANK,
CLEAN PITS. FILL PITS W/8.6 BRINE, RIG UP LINES TO TIGER TANK, COMP TREE
TEST SURFACE LINES TO 3000# TEST BAKER 9 5/8 PKR @ 2347' TO 1500# PULL
BPV. DISP 2 3/8 TBG & ANN BY PUMPING DOWN 2 3/8 TBG TAKING DIESEL
RETURNS TO TIGER TANK, BULLHEAD DOWN 4 1~ TBG MON WELL 10 MIN ON
VAC. INSTALL TWC ND COMPL TREE, NU BOP TP.
MAY 10, 1996
W/O 11" 3000# x 13 5/8" 5000# ADAPTER, TEST 9 5/8 PACKOFF, NO TEST ND
TREE NU BOP CHANGE PIPE RAM TO 4.5 TEST BOP, MANIFOLD TO 3000# PULL
TWC. MON FLUID LOSS 8.6# FLUID LOSS 1 BPM, PUMP 40 BBLS 8.5 1 BPM FLUID
LOSS PUMP 42 BBLS 8.4 FLUID LOSS 3 BPM SPOT 22 BBL XANVIS PILL FLUID
LOSS 1 BPH. W/O H20 MON WELL. BOLDS WORK PKR TRT TO RELEASE, PULL
UP TO 80K OVER STRING WT LOST TOTAL OF 191 BBLS FLUID, REDUCE WT TO
8.4# MADE UP 2 3/8 CS HYDRILL CROSSOVER PLUG FOR TEST PLUG IN
HANGER NO TOOLS AVAILABLE W/2 3/8 CS HYDRILL CONN.
MAY 11, 1996
RELEASE PKR W/90K OVER PULL CIRC COND FLUIDS TO 8.4# 2.5 BPM @ 180#
UNABLE TO WORK PKR DOWN HEAT FLUID W/HOT OIL & RIG TO 140 DE
ATTEMPT TO RELAX PKR ELEMENTS ATTEMT TO CIRC DOWN ANNUL TO RELAX
PKR (NO GO) CIRC HEATED FLUIDS SPOT 40 BBL XANVIS PILL ON BO'I-TOM
PERF. LD LANDING JT MU FISHING OVERSHOT GRAPPEL PULL 2 3/8 TBG PLUG
AND TBG FROM TBG HEAT, 30K# OVERPULL LD FISH EQUIP. TOH PULL 2 3/8
SIDE STRING LD SAME MU 4.5 LANDING JT PULL PKR FREE (55K# OVERPULL)
LD LANDING JT HANGER POH LD 4.5 TBG, 9 5/8 PKR, GLM. INSPECT LD ESP. RIG
UP CAMCO RUN 3" BAILER TO 3225' RECOVER 4 SMALL PCS RUBBER NO SAND,
RIG DOWN CAMCO. RIG UP TO RUN ESP, WAIT ON CENTRILIFT TO ARRIVE.
MAY 12, 1996
SERVICE RIG. RIG UP TO RUN ESP W/O CENTRILIFT MU PG TAIL SPLICE MU
SERVICE ESP MU PKR MU 2 PKR INLINE ESP SPLICES TIH W/ESP COMP. MU
ESP LINE HANGER SPLICE (RAN 161 BANDS ON CABLE). LAND TUBING RILDS,
LD LANDING JT. RIH W/2 3/8 SIDE STRING, LAND SAME. RIG UP LANDING JT
DROP ROD & BALL, 1.375 FISH NECK ON ROD TEST PKR 1500#. PREPARE TO
REMOVE ROD BALL, FREEZE PROTECT TUBING.
Page 1 of 2
SUMMARY OF DALLY OPERATIONS
MAY 13, 1996
SERVICE RIG. RIG DOWN LANDING JT DRAIN BOP, SET TWC, CLR FLOOR ND
BOP STACK ATTEMPT TO NU TREE (TREE TBG SPOOL HANGER) NOT LINED UP
RU ALIGN HANGER W/ALIGNMENT PIN NU TREE. TEST HANGER, ADAPTER
FLANGE 3000# TEST TREE 3000# TEST ESP (OK) FREEZE PROTECT ANNUL
W/120 BBLS DIESEL PULL TWC, SET BPV, BLOW DOWN LINES, SECURE WELL &
CELLAR. RIG RELEASED @ 1900 HRS ON 5/12/96.
Page 2 of 2
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
2
1. Operations pedormed: Operation shutdown m Stimulate m Plugging ~
x
Pull tubing __ Alter casing ~ Repair well __
5. Type of Well:
Development
Exploratory
Stratigraphicx__
Service
2. Name of Operator
CONOCO INC.
Pedorate ~ X
Other ~
6. Datum elevation (DF or KB)
8. Well number
CFP- 1
9._P_errn_it number/approval number
3. Address
P.0. BOX 340045, PRUDHOE BAY, AK 99734
4. Location of well at surface
303' FSL, 2075' FEL, SEC 24, T13N, RIOE, UM
At top of productive interval
303' FSL, 2875' FEL, SEC 14, T13N, RIOE, UH
At effective depth
N/A
At total depth
303' FSL, 3089' FEL, SEC 24, T13N, RIOE, UN
3601 ' feet Plugs (measured) N/A
3429' feet ~
N/A feet Junk (measured) N/A
N/A feet
rtver
"1' Pr"~'l' T A rJv U~mJA C' A ilr"t
12: Present well condition summary
Total depth: measured
true vertical
Effec.tive depth: measured
true vertical
feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
Conductor 80' 20" H-40,94# 100 CF PERM C 115' 115'
Surface 2137' 13 3/8" K-55,72# 3250 SX ARCTIC SET II 2172' 2100'
Intermediate
Production 4055' 9 5/8" K-55,36# 530 SX ARCTIC SET II 4090' 3900'
Liner 600 SX CLASS G 100 BBL ARCTIC PACK
Perforation depth: measured
2905'-25' , 2940'-75' , 3020'-30', 3085'-3110' ,3145'-3205' , 3220'-3310'
true vertical
Tubing (size, grade, and measured depth)
(2040'); SIDESTRING=2 3/8",4.6#CS HYDRIL(2035')
Packers and SSSV (type and measured depth)
B0T SUBMERSIBLE PUMP PACKER SET e 2347'.
13. Stimulation or cement squeeze summary N\A
Intervals treated (measured) N/A
4 1/2",12.75#,EUE(347');4 1/2",12.75#,L80 BTRC
Treatment description including volumes used and final pressure N/A-
jUi"i .t 8
·
· ~;~;l(a.0ii .& Gas Cons, Comrnissior~
'~ Anch0rag~
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
ANTICIPATING 10,000 TO 15000 BPD.
15. Attachments [ 16. Status of well classification as:
Copies of Logs and Surveys rurx_
I
Daily Report of Well Operations __ Oil __ Gas __ Suspended __
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Tubing Pressure
Service
SOURCE H20 WELL
Title SENIOR PRODUCTION FOREMAN
Date
L"~I II'~IAIT IIk,.I I'%1 ir',ll I~'%A-I'~
Conoco Inc.
Milne Point Operations Center
Pouch 340045
Prudhoe Bay, AK 99734
(907) 659-6300
MR. LONNIE SMITH
STATE OF ALASKA
OIL AND GAS COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, AK 99501
DEAR MR. SMITH,
FOLLOWING IS THE DAILY REPORT OF WELL OPERATIONS FOR THE CFP-1
WORKOVER:
DATE OPERATION
06/06/90
06/07/90
06/08/90
06/09/90
06/10/90
INSTALL BPV IN WELLHEAD, MIRU WORKOVER RIG.
DISPLACE ANNULAR FREEZE PROTECTION FLUID.
N/D TREE. N/U & TEST 3000# 13 5/8 ANNULAR
PREVENTOR. RIH AND PERFORATE TUBING 10 SHOTS IN
2' AND KILL WELL WITH 9.0 PPG BRINE.
POOH WITH PACKER AND SUBMERSIBLE PUMP. RIH WITH
REDRESSED PACKER AND NEW ELECTRIC SUBMERSIBLE
PUMP.
UNABLE TO SET PACKER.
POOH AND CHANGE OUT PACKER. RIH.
SET PACKER. SET BPV TUBING. N/D BOP. N/U & TEST
TREE TO 3000 PSIG -- OK. MOVE RIG OFF WELL.
EOR
RESPECTFULLY,
J.D. POLYA
DRILLING FOREMAN
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon __ Suspend m
Alter Casing __ Repair well
Change approved program m
2. N_a~e~Qp~r
~UNU~U 1ftC.
3. Addre~
P.O. BOX 340045, PRUDHOE BAY, AK
4. Location of well at surface
303' FSL, 2075' FEL, SECTION 24,
At top of productive interval
303' FSL, 2875' FEL, SECTION 24,
At effective depth
N/A
At total depth
303' FSL, 3089' FEL, SECTION 24,
Operation shutdown m Re-enter suspended well __
Plugging __ Time extension ~ Stimulate ~
Pull tubing ~ Variance __ Perforate __ Other
5. Type of Well:
Development
Exploratory
Stratigraphic
9973 Service
T13N, RIOE, UM
T13N, RIOE, UR
T13N, RIOE, UR
6. Datum elevation (DF or KB)
KB 27 feet
7. Unit or Property name
MILNE POINT UNIT
8. Well number
CFP-1
9. Permit number
85-8
10. APl number
50-- 029-21271
11. Field/Pool
KUP RIVER TERT WTR SAND
12. Present well condition summary
Total depth: meas'ured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
measured
3601 ' feet Plugs (measured)
feet
Length Size
20"
13-3/8"
9-5/8"
feet Junk (measured)
feet
Cemented
2905-2295; 2940-2975; 3020-3030;
true vertical
N/A
3424'
2659'
N/A
Measured depth
True vertical depth
;,o, RECEIVED
2200'
tvlAY - Ii 1990
3590 ~Jaska 011 & Gas ~11~, ~ltllil;~0It
Anch0ra~e
3085-3110; 3145-3205; 3220-3310
Tubing (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
4-1/.2" 12.75 EUE 8RD TBG; 4 6 PPF N-80 e 2370'
4-172"i '
12,75# BUTTRESS L-80
B0T TWIN SEAL SUBMERSIBLE PUMP PACKER e 2347'
13. Attachments
Description summary of proposal __ Detailed operations program ~ BOP sketchX__
14. Estimated date for commencing operation
MAY 8~ 1990
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil m
Service
Gas __ Suspended
SOURCE WATER WELL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ,~,(7~. ,/~/'~)j~) Title PRODUCTION FOREMAN
FOR COMMISSION USE ONLY
Date ~/Z//~D
Conditions of approval: Notify Commission so representative may witness
Plug integrity __ BOP Test __ Location clearance ~
Mechanical Integrity Test ~ Subsequent form required 10-
IA_pproval No~
!
Approved by order of the Commission
ORIGINAL SIGNED BY
LONNIE C. SMITH
Form 10-403 Rev 06/15/88
Commissioner
Appi Uved Copy
Date ~/(~ h~
SUBMIT IN TRIPLICATE
.
.
3.
·
·
.
e
.
o
10.
GENERAL NOTES PROCKDUCE
CFP #1 ESP REPLACEMENT
MOVE IN E-LINE TO PERFORATE THE THE 5' 4 1/2" BUTTRESS PUP JUST
ABOVE THE SUBMERSIBLE PUMP. THIS WILL ALLOW KILL FLUIDS TO BE BULL
HEADED INTO THE FORMATION.
MIRU EWS. PRE MIX 8.8 KCL BRINE, 350 BBLS. HEAT FLUIDS TO 120
DEGREES F. HOOK UP THE HOT OIL TRUCK TO CIRCULATE, WARM, THE
SIDESTRING ANNULUS TO 100 DEGREES.
DISPLACE BACKSIDE WITH 8.8 PPG FLUID (140 BBLS). (DISPLACED FLUID
WILL BE 60/40 GLYCOL, SAVE FOR END OF JOB). THEN BULLHEAD 40 BBLS.
8.8 KILL FLUID DOWN TUBING INTO THE FORMATION. FLUID WILL PASS
THROUGH PERFORATED JOINT SINCE PUMP IS BLOCKED.
NIPPLE DOWN TREE. NOTE: TREE HAS ALIGNMENT PIN, MAKE SURE AND BACK
PIN OUT BEFORE LIFTING. THRDS ON HANGER FOR PICK-UP ARE 2 3/8 EUE.
NU BOP. POOH W/ 2 3/8 HYDRIL SIDESTRING.
TIE IN TO 4 1/2 HANGER AND RELEASE PACKER. NOTE: THREADS ON HANGER
ARE 4 1/2 BUTTRESS FOR PICKUP. 60,000 ~'S PULL FOR PACKER
RELEASE.
POOH W/ PACKER AND PUMP. SPOOL CABLE SO HIGH POTTING IS POSSIBLE.
EQUIPMENT LIST IN WELL FROM TOP TO BOTTOM
- C/L CABLE (2500°)
- 2 3/8 HYDRIL TO BASE OF PERMAFROST (2035')
- 4 1/2 BUTTRESS PUP (1.83)
- 4 1/2 BUTTRESS TUBING (68 JTS)
- 4 1/2 BUTTRESS X 4 1/2 EUE CROSSOVER
- 4 1/2 EUE 8RD (11 JTS)
- 4 1/2 EUE PUP (15.9)
- 9 5/8 BROWN TWIN SEAL SUBMERSIBLE PACKER W/ 10' PIGTAIL ABOVE
AND 7' PIGTAIL BELOW.
4 1/2 VAM BOX X 4 1/2 BUTTRESS PIN
CAMCO D NIPPLE
4 1/2 BUTTRESS (1 JT)
4 1/2 BUTT PUP (5.25)
5 1/2 IOR X 4 1/2 BUTT
PUMP HEAD
PUMP
MOTOR
PSI UNIT
MAKE UP CENTRILIFT PUMP ASSEMBLY
RIH W/ PUMP NO FASTER THAN 2 FT/SEC.
***NOTE: MAY WANT TO RE-INSTALL THE 4 1/2 G/L MANDREL THAT WAS
REMOVED ON. A PREVIOUS WORKOVER TO AVOID PERFORATING COST IN THE
FUTURE.***
11. MAINTAIN CABLE TEMP OF AT LEAST 32 DEGREES F WHILE IN SPOOLING UNIT
12
13.
14.
15.
16.
17.
18.
BAND CABLE ABOVE AND BELOW EACH COLLAR AND MIDWAY ON EACH JOINT.
HIGH POT CABLE BEFORE SPOOLING IN HOLE. WIRE BELOW PACKER MAY BE
DAMAGED FROM PERFORATING
LAND TUBING, RIH W/ WIRELINE AND RUN CAMCO DB BLANKING PLUG AND
STANDING VALVE. SET IN DB-5 NOGO NIPPLE BELOW PACKER. SET PACKER
BY APPLYING 3500 PSI TO TUBING.
PRESURE UP BACKSIDE TO 1000 PSI TO TEST PACKER.
RIH W/ W/L AND RETRIEVE PLUG
CIRCULATE ANNULUS AND DISPLACE BRINE WITH 60/40 GLYCOL.
ND AND MOVE OFF.
RE(?EIVED
MA)' - 8 19(t0
~ oil & Gte Cons, Commission
{
,
3,000' 13 5/8" HYDRIL
. . . ...... . ....-- -'" ,. -' . ." ." ., ..'
.
.
.
- '. . , "
: . . " ." : . .
. . ".
.. '.
RECEIVED
MAY - 8 1990
Alaska ou " Gas Cons. Commission
. Anchorage
~-,~,~..,d.~"""'"''~''''''''''''''' . -"( lorfì1 r.,,-~'<::'1~fJ -----.- ---"".,' r-. ----'" ~~~r"'i" ',"TJ,"1I1'''I'''I'',"' ~~,"" ,,",~~"I';~71...,,1'!'~'~~
~' STATE OF ALASKA ~'-~".
A~,SKA OIL AND GAS CONSERVATION COM, SION
REPORT OF SUNDRY WELL OPERATION
1. Operations pedormed: Operation shutdown __ Stimulate X Plugging
Pull tubing ~ Alter casing ._:_ Repair well X
Perforate __
Olher __
2. Name of Operator
CONOCO INC.
Address
3201 C STREET #200, ANCHORAGE, AK 9950."
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
Location of well at surface
305' FSL, 2075' FEL, SECTION 24, T13N, R10E, UM
At top of productive interval
303' FSL, 2875' FEL, SECTION 24, T13N, R10E, UM
At effective depth
N/A
At total depth
303' FSL, 3089' FEL, SECTION 24, T13N, R10E, Ut,[
6. Datum elevation (DF or KB)
KB 27
7. Unit or Property name
MILNE POINT UNIT
8. Well number
CFP-1
9. Permit number/approval number
85-8 ¢-~,~?/
10. APl number
50--029-21271
11. Field/Pool
KUPARUK RIVER FIELD
feet
12.
Present well condition summary
Total depth: measured
true vertical
Effec.tive depth: measured
true vertical
3601 ' feet Plugs (measured) N/A
3429 ' feet
N/A feet Junk (measured) N/A
N/A feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented Measured depth True vertical depth
20" 110'
13-5/8" 2200'
measured
true vertical
9-5/8" 3590'
2905'-2925' 2940'-2975' 3020'-3030' 3085'-3110', 3145'-3205'
, ' ' '
3220'-3310'.
~bing(size, grade, andmeasumddepth) 4-1/2", 12.75#/FT EVE 8RD; 4'1/2",
(2370') 2-3/8", 4.6#/FT CSHYDRILL,
Pac~rsandSSSV(typeandmeasureddepth)
BOT TWIN SEAL SUBMERSIBLE PUMP PACKER @ 2347'.
12.75#/FT BTRS. L-80;
(2035'): SIDESTRING.
13. Stimulation or cement squeeze summary
N/A
Intervals treated (measured)
N/A '
Treatment description including volumes used and final pressure
N/A
Gas Cons. Commission
Apchorage
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Md Water-Bbl Casing Pressure
Tubing Pressure
0
ANTIcIpATING 10,000 to'i5,00-0-BPD-
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations _~X
16. Status of well classification as:
Oil __ Gas __ Suspended __
Service SOURCE WATER WELL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed /..~. ; /~/~4'z~-~) Title SENIOR PRODUCTION FOREMAN
SUBMIT IN DUPLICATE
Form 10-404 Rev 06/15/88
DAILY WELL ACTIVITY
CFP-1
8/22/89
-EWS RIG ON LOCATION
-HEAT 8.8 BRINE TO 120 DEGREES
8/23/89
-PUMP 140 BBLS BRINE DOWN ANNULUS TO CIRCULATE THROUGH SIDE
STRING. PUMP 40 BBLS BRINE DOWN TUBING TO KILL WELL
BOBBY~ABOUT BOP TEST, SAID TO TEST WITHOUT
HIM. TEST BOP'S. --~~o~e~
-RIG UP AND PULL SIDE STRING
-RIG UP AND PULL PACKER. START OUT OF HOLE. LAY DOWN PUMP
AND MOTOR.
8/24/89
-RIH WITH NEW PUMP AND MOTOR. STANDING VALVE RUN IN PLACE
IN D NIPPLE.
-START IN WITH REDRESSED PACKER.
-LAND TUBING HANGAR
-RIH WITH SIDE STRING.
-SIDE STRING DAMAGED PUMP CABLE. MAKE 2 SPLICES ON CABLE.
8/25/89
-LAND TUBING HANGAR AGAIN. RIH W/ SIDE STRING AGAIN, NO
PROBLEMS
-NIP DOWN BOP AND NIPPLE UP TREE.
-PUMP 184 BBLS OF 60/40 GLYCOL TO FREEZE PROTECT ANNULUS
-PRESSURE UP ON TUBING TO SET PACKER, STANDING VALVE LEAKING
-PULL STANDING VALVE WITH WIRELINE UNIT, FOUND TRASH.
REDRESS VALVE AND RERUN
-PRESS UP TO TUBING TO 3600 PSI TO SET PACKER. BLEED OFF.
-PRESS UP BACKSIDE TO 500 PSI. PACKER IS SET OK.
-RIG DOWN AND MOVE OFF LOCATION.
8/29/89
-RIG UP CAMCO AND PULL STANDING VALVE.
OCT 0 3
Alaska Oil & Gas ConS. commission
Anchora.~e
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
I61N
AL
2. Name of Operator
Conoco Inc.
3. Address
3201
1. Type of Request: Abandon __ Suspend __ Operation shutdown __ Re-enter suspended well __
Alter casing __ Repair well __x Plugging __ Time extension __ Stimulate __
Change approved program __ Pull tubing __ Variance __ Perforate __ Other __
5. Type of Well: 6. Datum elevation (DF or KB)
Development __ KB 27
Exploratory __
Stratigraphic __ 7. Unit or Property name
C Street, Ste 201, Anchorage, AK )503 Service :x Milne Point Unit
12.
feet
Location of well at surface
303' FSL, 2075' FEL, Section 24, T13N, R10E, UM
At top of productive interval
303' FSL, 2875' FEL, Section 24, T13N, R10E, UM
At effective depth
N/A
At total depth
303' FSL, 3089' FEL, Section 24, T13N, R10g, UM
Present well condition summary
Total depth: measured
true vertical
3601 ' feet
feet
Plugs (measured) N/A
3424'
8. Well number
CFP-1
9. Permit number
85-8
10. APl number
50-- 029-21271
11. Field/Pool
Kup River Tert Wtr Sand
Effective depth: measured
true vertical
feet
feet
Junk(measured) 2659'
N/A
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth: measured
2905-2295; 2940-2975;
true vertical
Length
Size
Cemented Measured depth True vertical depth
20"
13-3/8"
9-5/8"
3020-3030; 3085-3110;
Tubing (size, grade, and measured depth)
-4-1/2"; 12.75 EUE 8RD tbg; 4.6 PPF N-80
Packers and SSSV (type and measured depth)
BOT twin seal submersible pump packer @
13. Attachments Description summary of proposal __
110'
2200'
3590'
3145-3205; 3220-3310
@ 2370'
2347'.
Detailed operations program ._~ BOP sketch .,x_
14. Estimated date for commencing operation
August 21, 1989
16. If proposal was verbally approved
Name of approver
Date approved
17. I hereby certify that the foregoing is true and correct to the best of m,
Signed
15. Status of well classification as:
Oil __
Service
Gas __
Source
Suspended __
Water Well
, knowledge.
Title Senior Production Foreman
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Date
I*pprOvalNO' f'" 7/ ~
Plug integrity __ BOP Test __ Location clearance __
Mechanical Integrity Test __ Subsequent form required 10- /-/~' ~¢
Approved by order of the Commission
Origlnal Signed By
David W. Johnston
Commissioner
Approved Copy
Returned
Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE
GENEI~L NOTES PROCEDURE
·
·
·
·
·
·
·
·
MIRU pre-mix 8.6 ppg KCL brine· Total volume required plus
excess 450 barrels. Heat brine in tanks to 120 degrees F.
Note: Set frac tanks, spool unit, etc.
Circulate down sidestring and displace annular volume of
propylene glycol to frac tank. Calculated volume 124 bbls.
Pump 40 bbls down tubing to kill well.
well) .
(No BPV installed in
ND tree. Note: Tree has alignment pin, make sure and back
pin out before lifting. THRDS on hanger for pick-up are 2-
3/8" EUE.
NU BOP. POOH with 2-3/8" CS hydril sidestring.
Tie in to 4-1/2 hanger and release packer. Note: Thrds on
hanger for pick-up are 4-1/2" BTRS box. Pick-up weight to
release packer is 60,000 above string weight max poll.
Note: Several times in the past slips on packer did
not release but pin did shear. To release had to set
slips under hanger. Remove hanger and set down.
POOH with 4-1/2" tbg and spool pump cable. Note: Access
cable end on spool for hi potting cable.
Equipment list in well from top to bottom. Lengths are
approximate.
m
m
m
m
m
m
m
m
m
m
--
m
REDA #2 round redared ESP power cable (2513;)
2-3/8" CS hydril to base of permafrost (2035')
4-1/2 BTRS tbg from surface to 2-3/8" tbg tail (2035')
4-1/2 BTRS x 4-1/2 EUE 8RD X-0 (1')
4-1/2 EUE 8RD to tubing tail (478')
Hughes 9-5/8" x 4-1/2" x 2-3/8" submersible pump packer
with (10') pigtail above and (7') pigtail below.
1 pup 4-1/2 EUE 8RD (16')
Camco 4-1/2 MMG gas lift mandrel (+10')
1 joint 4-1/2 EUE 8RD (28')
Camco DB-5 no-go nipple with 3.687" ID (2')
1 joint 4-1/2 EUE 8RD (30')
Pump head (1')
10,000 pump (45 stages) (21')
Motor protector (s)
Protector motor adaptor (1') ~ i"~
130 hp motor (21') i~ .~ ~. ~. ~ ~ ~,~· ,~
PSI unit (5')
4-1/2 tbg pup with centralizer
·
10.
11.
12.
13.
14.
15.
16.
17.
RIH with 4-1/2", attempt to fish pump centralizer.
fish at 2659' WLM.
Top of
Make up centerlift pump assembly.
Do not run motor/pump assembly in hole faster than 2
ft/sec.
Maintain cable temperature of at least 32 degrees F while in
spooling unit. Refer to attached REDA letter.
Band submersible pump cable to 4-1/2 tbg only above and
below each collar and midway on each joint.
Hi-pot ESP power cable prior to removing from spool.
Once tbg is landed, RU wireline, run a Camco DP blanking
plug and standing valve. Set in the DB-5 no-go nipple below
the packer. The packer can then be set by applying ±3500
psi tbg pressure on the 4-1/2" tbg.
RIH with wireline. Retrieve standing valve and RD.
Circulate annulus and displace brine with propylene glycol
to 2035' approximately 120 bbls
18. ND and move off.
·
STATE OF ALASKA
ALASKA OIL AN D GAS CONSERVATION COM MISSION
APPLICATION FOR SUNDRY APPROVA [LLi ] LA [
1. Type of Request: Abandon __ Suspend __ Operation shutdown __ Re-enter suspended well ---v
Alter casing __ Repair well __ Plugging __ Time extension __ StimulateA
Change approved program __ Pull tubing __ Variance __ Perforate ~ Other
2. Name of Operator
CONOCO ~'NC.
3. Address
3201 C ST.. STE 200~
4. Location of well at surface
303' FSL, 2075' FEL,
At top of productive interval
303' FSL, 2875' FEL,
At effective depth
N/A
At total depth
303' FSL, 3089' FEL,
ANCHORAGE 99503
5. Type of Well:
Development __
Exploratory __
Stratigraphic _._
Service .~
SEC 24, T13N, R10E, U.H.
SEC 24, T13N, R10E, R.M.
SEC 24, T13N, R10E, U.H.
6. Daturr~evat~ (DF or KB)
7. Unit or Property name
MILNE POINT UNIT
8. Well number
CFP-1
9. Permit number
85-8
10. APl number
50- 029-21271
11. Field/Pool
feet
Kup Riv. Tert. Wtr. Sand
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
3601 ' feet Plugs (measured)
3429' feet
feet Junk (measured)
feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented Measured depth
20" 110'
13 5/8" 2200'
9 5/8" 3590'
measured 2905-2995; 2940-2975; 3020-3030; 3085-3110;
True vertical depth
N:ska 0il & Gas Cons. 60m.missi:
Anchorage
3145-3205; 3220-3310
true vertical
Tubing (size, grade, and measured depth) 4 1/2"; 12.75 lb/ft. EUE 8RD; 4 1/2 12.75 lb/ft. Btrs L-80
Packers andSSSV(typeandmeasureddepth) B0T twin seal submersible pump packer e 2347'
13. Attachments Description summary of proposal ~ Detailed operations program ~ BOP sketch ~
14. Estimated date for commencing operation
08/07/8g
16. If proposal was verbally approved 08/07/8 9 Oil __
Name of approver /y~ I ~'~ ~)/~WD/c"'/~ Date approved Service
17. I hereby certify that the foregoing is trbe and correct to the best of my knowledge.
Signedl~L// ~ Title Senior Prod,
/
15. Status of well classification as:
Gas __ Suspended
Water Source Well
Foreman Date
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test ~ Location clearance ~
Mechanical Integrity Test ~ Subsequent form required 10- J4 ~
Original Signed By
Approved by order of the Commission David W. johnston
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
PROPOSED WELL OPERATIONS:
1. Ice plug in 4 1/2" production tubing and in g 5/8" annulus.
2. Rig up coil tubing run in hole down 4 1/2" tubing.
3. Circulate hot diesel and melt ice plug, stop at depth of 2,400'.
4. Continue to circulate hot diesel to thaw ice plug in annulus.
5. Once annulus plug is thawed displace annulus w/clean diesel.
6. Pressure test annulus. Rig down coil tubing and place well in service.
CFP-1
MILNE POINT UNIT (WATER SOUR~,£
ACTUAL COMPLETION SKETCH
COMPLETED ON 3-30-85
RE-COMPLETED ON 2-1-86
WELL)
FMC DUAL STRING TUBING HANGER wi 4' 'H' BPV PROFILE
NOTES:
1. All meeeurementa are from KDB of
Nabore Rig ~278
2. KDB- SL 50'
3. KDB - GL 24'
4. Max. angle 30.75° et 2100'
6. KOP 800'
B. S-type hole
7. Min. angle 14.2°et 3600' MD
4 1/2' 12.76~ L-80 Buttreee tubing
(3.958' ID, 3.833' drift)
--No. 2 Centrilifl '200' ESP power cable (1.30' OD)
--2 3/8' CS Hydrll tubing eldeetrlng
8. APl No. 60-029'21271
$. Completion fluid 8.8 ppg-*l~Cl
Ceaing and cement informetlon eupplled
on clllng Ind cement eketch.
2035' Tubing Tell
4 112', 12.75~ EUE B rd. Tubing
(3.g66' ID, S.833' drift)
234]" BOT Twin 8eal'Submerelblo Pump Packor
2370' CAMCO 4 1/2' MMG Gaa Lift Mandrel (3,858'
2407' GAMCO DB-5 nipple (3.367' ID) ID
2513' Tubing tall
PERFORATIONS:
TERTIARY WATER 8ANDS
8' Venn Gune, 12 8PF. 120'pheelng
2905' - 2925'
2940' - 2875'
3020' - 3030'
3085' - 3110'
3145' - 3205'
3220' - S310'
(All depths from DIL log 1-25-85)
67B' Baker 'SC-lA' packer
~2858' Top of act/In ~'~
~ulTlm,~olui~
Alaska 0il & 6as Co~s~ ',' =~'~'
Anchorage
1/2'. ~7~ 12 guege wire-wrapped Icreen
(4.882' ID, 6.og' OD)
NOTE: Gravel peck log run on 10/26/86
Indicated good peck with gravel
top et 2810':~
-- 3233' '0' ring loll lub w/3g.23' tell-tale
12 guage ecreen (2.3T6' ID)
--__~ 3273' Bottom of bull-nose plug on liner
-- --3331' Baker Model 'D' 8ump Packer
3505' PBTD
3690' g 6/8', 36f K-SS (8.921' ID, 8.766' drift)
Conoco Inc,
Milne Point Operations Center
Pouch 340045
Prudhoe Bay, AK 99734
(907) 659-6300
June 4, 1989
Mr. C. V. Chatterton
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mr. Chatterton:
RE: Report of Sundry Well Operations
Attached please find a Report of Sundry Well Operations for the Milne Point
Unit Well CFP-1.
If you should have any questions, please contact Bob Soptei or Hal Stevens at
(907) 659-6327.
Yours very truly,
D. F. Rainwater/E. L. Robinson
Senior Production Foreman
RJS
Attachments
cc Production Specialist, MPOC
Safety and Compliance Coordinator, MPOC
Steve Rossberg, Anchorage
RECEIVED
'JUN o 7 1969
'Ala~ Oil & Gas Cons. Commission
,, ;Anchorage
STATE OF ALASKA
AL"--" -',A OIL AND GAS CONSERVATION OOMM!---~"'D N
REPOffi OF SUNDRY WELL OPErtATIONS
Po'.! tubing ~ Alter caslng __ Repair well
2. Name of Ope'~'~a~r-- ...... *'~' .......... ' ........ '"' i 5." Type of Well:
Conoco Inc. I Development__
.... Exploratory ._..
3, Address --' Stratigraphlc .... 3201 C St., Suite 200; Anch.,Ak. 99503 Source Wa~{
· .... -~....-~.~,:
4, Location of well at sudace
Odher __
Datum elevation (DF or KB)
KB-27 feet
7, Unit or Property name
Milne Point
8, Well number
303' FSL, 2075' FEL, Sec 24,
At top of productive Interval
303' FSL, 2875' FEL, Sec 24,
At effective depth
N/A
At total depth
303' FSL, 3089' FEL, Sec 24,
12. Present well condition summary
Total depth: measured 3601 ' feet
true vertical 3429' feet
Effec.tlve depth: ¢~easured N/A
t~ue vedical N/A
T13N, R10E, UM
T13N, R10E,UM
T13N, R10E, UM
Plugs(measured) N/A
feet Junk(measured) N/A
feet
CFP- 1
85-8 '-/t' -'"
10. APl number
50-- 029-21271
11. Field/Pool Kuparuk River
Te~tjmry WBtP_r_ gnn_H
Casing
Structural
Conductor
Sudece
Intermediate
Production
Liner
Perforation depth:
Length Size
measured
true vertical
Cemented Measured depth True vert~,cal depth
20" 110'
13 5/8" 2200'
9 5/8" 3590'
2905'-2925' 2940'-2975' 3020'-3030' 3085'-3110'
3145'-3205', 3220'-3310':
TuMng(aiz6grade, andmeasureddepth) 4 1/2", 12.75#/ft. EUE 8RD; 4 1/2", 12.75#/ft. Btrs. L-80;
(2370'); 2 3/8", 4.6#/ft. CS Hydrill, (2035'): Sidestring
Packers and SSSV (type and measured depth) But Twin Seal Submersible Pump Packer @ 2347'
lA Stimulation or cement squeeze summary N/A
I ntervalstree, ted (measured) N/A R E C E JV E D
Treatment descrip',ion including volumes used arid final pre,sure N/A J U
1~,. - - --=--'~ R,,R..~resentative Oall~yAve~___~_~ge Production or Injection Gas
OiI-Bbl G~-Mcf VV'ater-Bbl L;asing Fressure Anch'r. bl~¢¢ Pre.ore
Prior to well operation -0 .... 50 PSI
Subsequent to operation 10, 172 175 PSI
-15. Attachme'~ ..... ""
Copies of Logs and Surveys run __
Daily Report of Well Operations ..%.
-:17. I he'r'eby C~rtif¥ that the foregolng Is true and correct to the beet of my knowledge.
' "~-~' Title '.._ . ~.'
;erin 10-404 Rev 06/15/88
--' i 1'8~ Status of well cle$.slfication aS:
I
~ Gan__ Suspended ._,...
Sar'vice
Source~ater Well
-oat_
SUBMIT IN DUPLICATE
DAILY WELL ACTIVITY REPORTS
CFP #1 SOURCE WATER WELL
05/21/89
- MIXED 500 BBL.'S OF 8.6 PPG KCL BRINE, HEATED TO 125
DEGREES.
- PUMPED 125.3 BBL.'S OF BRINE DOWN THE 2 3/8" SIDESTRING.
COMPLETED DISPLACEMENT OF ANNULUS.
- RU TO PUMP DOWN 4 1/2" TUBING.
- PUMPED 46 BBL.'S DOWN TUBING, CHECKED FOR PRESSURE ON 2
3/8" AND 4 1/2" STRINGS, FOUND NONE.
- SET 4" BPV IN TUBING STRING. REMOVE TREE AND NU BOP'S.
- TESTED THE BOP'S TO 1000 PSI FOR 10 MINUTES. NO LEAKS.
- PULLED 32 STANDS OF 2 3/8" CS HYDRILL OUT OF HOLE.
- RAN ONE JOINT OF 4 1/2" BTRS. IN HOLE AND SET SAFETY
VALVE.
- DRAINED HOSES AND EQUIPMENT FOR THE NIGHT.
05/22/89
- CHECKED FOR PRESSURE ON BOTH STRINGS, FOUND NONE.
- TRIED TO PULL 4 1/2" STRING OUT OF HOLE. PACKER ASSEMBLY
SHEERED BUT SLIPS ON PACKER WOULD NOT RELAX.
- PUMPED DOWN 2 3/8" STRING IN ORDER TO PUT PRESSURE ON TOP
OF PACKER. PUMPED TO 1000 PSI FOR 10 MINUTES.
- WORKED THE 4 1/2" STRING AGAIN WITH NO LUCK.
- SET BPV IN 4 1/2" STRING.
- SET 4 1/2" JOINT IN HANGER WITH SAFETY VALVE.
- WAITING TO RUN A STRING SHOT IN PACKER TO FREE UP.
05/23/89
- CHECKED PRESSURE ON ANNULUS. SMALL GAS BUBBLE, BLED OFF.
- FILLED HOLE WITH BRINE.
- PULLED BPV IN 4 1/2" STRING.
- RAN STRING SHOT IN 4 1/2" TUBING DOWN TO PACKER. SET
COLLAR LOCATOR AT 2347', SHOT SET AT 2352' CENTER OF PACKER.
FIRED SHOT AND PULLED OUT OF HOLE WITH E-LINE.
- ATTEMPTED TO PULL PACKER ASSEMBLY, WOULD NOT FREE UP.
- RAN ANOTHER STRING SHOT IN 4 1/2" TUBING DOWN TO PACKER.
SET IN SAME PLACE. FIRED STRING SHOT AND PULLED OUT OF HOLE.
- WORKED PACKER ASSEMBLY WITHOUT ANY LUCK.
- RIGGED UP FREE POINT TOOL TO FIND WHERE THE PIPE WAS
ACTUALLY STUCK. SHOWED THAT WE WERE STUCK AT THE PACKER.
- SET BPV IN 4 1/2" AND INSTALLED THE SAFETY VALVE FOR THE
NIGHT.
05/24/89
- CHECKED PRESSURE ON ANNULUS AND FILLED HOLE WITH BRINE.
"
- PULLED BPV IN 4 1/2 STRING.
- REMOVED TUBING HANGER IN ORDER TO WORK PACKER
Alaska Oil & Gas Cons. Commission
Anchorage
UP. WORKED PACKER DOWN 17' AND WORKED BACK AND FORTH UNTIL
PACKER ASSEMBLY FREED UP.
- STARTED COMING OUT OF HOLE WITH 4 1/2" TUBING AND CABLE.
- COMPLETED REMOVAL OF TUBING AND PUMP ASSEMBLY.
- CLOSED BOP'S AND INSTALL SAFETY VALVE FOR THE NIGHT.
05/25/89
- CHECKED PRESSURE ON ANNULUS. FOUND NONE.
- HEATED UP BRINE AND CIRCULATED THROUGH ANNULUS.
- RAN IN HOLE WITH 2 3/8" GRAPPLE TO FISH OUT CENTRALIZER.
SET DOWN THREE TIMES AND PULLED OUT OF HOLE.
- RE-DRESS OVERSHOT WITH 4 1/2" GRAPPLE, SET DOWN THREE
TIMES AND PULLED OUT OF HOLE. RETRIEVED FISH.
- RUN IN HOLE WITH ONE STAND OF 4 1/2", INSTALLED SAFETY
VALVE AND SHUTDOWN FOR THE NIGHT.
05/26/89
- CHECK FOR PRESSURE ON ANNULUS. FOUND NONE.
- ASSEMBLE PUMP AND MOTOR ON TOOL STRING.
- MAKE ELECTRICAL CONNECTION TO PUMP AND BAND FLATWIRE UP TO
PACKER.
- MAKE SPLICE TO PACKER.
- PLUG PUMP CABLE INTO PACKER.
- RUN IN HOLE WITH PUMP ASSEMBLY.
- MAKE ELECTRICAL SPLICE ON TUBING HANGER.
- SET TUBING HANGER IN HEAD, AND LOCK DOWN PINS.
- CLOSE BOP'S AND INSTALL SAFETY VALVE FOR THE NIGHT.
05/27/89
- CHECK PRESSURE ON ANNULUS. FOUND NONE.
- SET BPV IN 4 1/2" TUBING HANGER.
- RUN IN HOLE WITH 2 3/8" SIDESTRING.
- INSTALLED TREE CAP BACK ON WELL.
- REMOVED BPV IN TUBING HANGER.
- RIG UP WIRELINE TO INSTALL DB-5 CAMCO PLUG.
- WOULD NOT SET IN TUBING. POOH AND INSPECTED PLUG. FOUND
WRONG PLUG ON SUB.
- CONTINUE RIGGING DOWN WORKOVER RIG.
- SET PLUG IN DB-5 NIPPLE. PRESSURE UP TUBING TO 2500 PSI,
BLED TUBING DOWN TO 15OO PSI, AND PRESSURE UP ANNULUS TO
1500. PRESSURE BACK UP ON TUBING TO 3500 PSI AND PACKER SET.
- PRESSURED UP ANNULUS TO 950 PSI, TAKING BRINE RETURNS THRU
THE 2 3/8" SIDESTRING. DISPLACED THE ANNULUS WITH GAS TILL
THERE WERE NO MORE RETURNS.
Conoco Inc.
Milne Point Operations Center
Pouch 340045
Prudhoe Bay, AK 99734
(907) 659-6300
May 17, 1989
Mr. C. V. Chatterton
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive,
Anchorage, Alaska 99501
RE: Sundry Notices for Milne Point Unit Wells
Dear Mr. Chatterton:
Please find attached Sundry Notices for the following Milne Point
Unit Wells: B-23, C-20, E-3, and CFP-1. These notices have all
been verbally reviewed by members of your staff.
Should you have any questions, please contact either Roy Robinson
or Doug Rainwater at 659-6323. Thank you for your time and
consideration.
D. F. Rainwater/E. L. Robinson
Senior Production Foreman
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon __ Suspend __
Alter casing __ Repair well X_._
Change approved program __
2. Name of Operator
CONOCO INC.
3. Address
3201 C ST.~ STE 200,
4. Location of well at surface
303' FSL, 2075' FEL,
At top of productive interval
303' FSL, 2875' FEL,
At effective depth
N/A
At total depth
303' FSL, 3089' FEL,
ANCHORAGE 99503
Operation shutdown m Re-enter suspended well ~
Plugging ~ Time extension ~ Stimulate m
Pull tubing m Variance m Perforate ~ Other
5. Type of Well:
SEC 24, T13N, RIOE, U.M.
SEC 24, T13N, RIOE, R.M.
SEC 24, T13N, RIOE, U.M.
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KB 27
Z Unit or Propedy name
MILNE POINT UNIT
8. Well number
CFP-1
9. Permit number
85-8
10. APl number
50- 029-21_27]
11. Field/Pool
Kup Ri v. Tert. Wtr. Sand
feet
12. Presentwell condition summary
Total depth: measured 3601 ' feet
true vertical feet
Effective depth: measured feet
true vertical feet
Casing Length Size
Structural
Conductor 20"
Surface 13 3/8"
Intermediate
Production 9 5/8"
Liner
Perforation depth: measured 2905-2295; 2940-2975;
true vertical
Plugs (measured)
Junk (measured)
Cemented
3020-3030;
N/A
3429'
2659'
N/A
Measured depth
110'
2200'
True vertical depth
3085-31101 3145-3205; 3220-3310
Tubing (size, grade, and measured depth) 4 1/2"; 12.75 EUE 8RD tbg; 4.6 PPF N-80 @ 2370'.
Packers and SSSV (type and measured depth) B0T twin
13. Attachments
Description summary of proposal ,-._
seal submersible pump packer 0 2347'
Detailed operations program ~X' BOP sketch
14. Estimated date for commencing operation
5118189
Date approved
16. If proposal was verbally approved 5/]. 5/89
Mike Minder
Name of approver
15. Status of well classification as:
Oil __
Service
Gas __ Suspended __
Source Water Well
17. I hereby certify thaJ~e foregoing is true and correct to the best of my knowledge.
Signed TitleSenior Prod. Foreman
FOR COMMISSION USE ONLY
Date
Conditions of approval: Notify Commission so representative may witness
Plug integrity __ BOP Test __ Location clearance __
Mechanical Integrity Test __ Subsequent form required 10- /¢ ¢ ~L
APProved Copy
ORIGINAL SIGNED BY Returned
LONNIE 6. SMITH ~ -'//-~ ?
Approved by orderoftheCommission ' ' uo~ssioner
IApprovalNo. /~_ ~¢7
Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE
GENERAL NOTES PROCEDURE
·
·
S~
e
ge
MIRU Pre-mix 8.6 ppg KCL brine. Total volume required plus excess 450
barrels. Heat brine in tanks to 120°F. Note: Set frac tanks, spool
unit, etc.
Circulate down sidestring and displace annular volume of propylene glycol
to frac tank. Calculated volume 124 bbls.
Pump 40 bbls down tubing to kill well. (No BPV installed in well).
ND tree. Note' Tree has alignment pin, make sure and back pin out before
lifting. THRDS on hanger for pick-up are 2 3/8" EUE.
NU BOP. POOH with 2 3/8" CS hydril sidestring.
Tie in to 4 1/2 hanger and release packer. Note' Thrds on hanger for
pick-up are 4 1/2" BTRS box. Pick-up weight to release packer is 60,000
above string weight max poll.
Note: Several times in the past slips on packer did
not release but pin did shear. To release had to set
slips under hanger. Remove hanger and set down.
POOH with 4 1/2" tbg & spool pump cable. Note: Access cable end on spool
for hi potting cable.
Equipment list in well from top to bottom. Lengths are approximate.
REDA #2 round redared ESP power cable (2513')
2 3/8" CS hydril to base of permafrost (2035')
4 1/2 BTRS tbg from surface to 2 3/8" tbg tail (2035')
4 1/2 BTRS X 4 1/2 EUE 8RD X-O (1')
4 1/2 EUE 8RD to tubing tail {478')
Hughes 9 5/8" X 4 1/2" X 2 3/8" submersible pump packer with (10')
pigtail above & (7') pigtail below.
1 pup 4 1/2 EUE 8RD (16')
Camco 4 1/2 MMG gas lift mandrel (+10')
1 joint 4 1/2 EUE 8RD (28')
Camco DB-5 no-go nipple with 3.687" ID{2')
1 joint 4 1/2 EUE 8RD (30')
Pump head (1') ~
10,000 pump (45 STAGES) (21') .~ ~
Motor protector(s' )
Protector motor adaptor (1') ~
130 hp motor (21') '- ~ ~
PSI unit (5')
4 1/2 tbg pup with centralizer
RIH with 4 1/2",attempt to fish pump centralizer. Top of fish @ 2659'
WLM.See attached drawing for fish configuration.
10.
11.
1~.
13.
14.
15.
16.
17.
18.
Make up centerlift pump assby.
Do not run motor/pump assby in hole faster than 2 ft/sec.
Maintain cable temp of at least 32°F while in spooling unit. Refer to
attached REDA letter.
Band submersible pump cable to 4 1/2 tbg only above and below each collar
and midway on each joint.
Hi-pot ESP power cable prior to removing from spool.
Once tbg is landed, RU wireline, run a Camco DB blanking plug & standing
valve Set in the DB-5 no-go nipple below the packer. The packer can
then ~e set by applying +3500 psi tbg pressure on the 4 1/2 tbg. (See
attached reference from BOT.)
RIH with wireline. Retrieve standing valve & RD.
Circulate annulus & displace brine with propylene glycol to 2035',
approximately 120 bbls.
ND & move off.
3,00'0# 13 5/8" HYDRIL
Tom Painter
Division Manager
Conoco Inc.
3201 C Street
Suite 200
Anchorage, AK 99503
March 16, 1987
Ms. Fran Jones
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Ms. Jones:
Enclosed please find the drilling "well history" from Conoco's Milne
Point Unit well No. CFP-1.
If you require additional information concerning this well history,
please contact Don Girdler at 564-7637.
Division Manager
DRG/w
CFP-1
Kuparuk River Field North Slope Borough, Alaska W.I. - 50.58467%
Milne Pt. CFP No.51- CONFIDENTIAL
API No. 50-029-21271. Ak. Permit No. 85-8. Elevation: 59' KB.
Location: 303' FSL, 2075' FEL, Sec. 24, T13N, R10E, Umiat Meridian
01-20: Prepare to move rig. Move pipe sheds, mud pits, motor
complex, sub base. Lay lines and set mats, set motor complex, set
pipe sheds. Set pipe sheds. Work on steam & ducting for heaters; NU
Tankco wellhead system & diverter. Take on water to begin mixing spud
mud.
01-21: NU flowline, bell nipple, diverter lines, mix spud mud.
Repair diverter lines, set mouse hole, connect hydraulics to hydril.
PU BHA. Test annular BOP & diverter value - 100 psi function test.
Drlg. from 80' to 181'. POOH & repair Kelly spinner. Drlg from 181'
to 732'. Repair flowline. Drlg. from 732' to 823'. Circ. bottoms
up, slug pipe, POOH to pick up directional assembly.
01-22: Repairing SCR system. POOH. Repair easy torque (shuttle
valve). POOH, Lay down stab. & bit. Orient Navidrill & RIH. Drill
w/mud motor, survey every joint attempt to establish 2½°/100' from
825' to 1666'.
01-23: Drlg. w/mud motor. Run wireline survey @ 1773'. Drlg from
1773' to 2200' w/motor. Make a short trip. Pump slug POOH. Slip &
cut drill line. L/D BHA. RU to run 13 3/8" csg. Run 13 3/8" csg.
Attempt to make up 13 3/8" Tankco hanger to landing joint. Hanger
found to have improper profile. Circ. & work csg. while W.O.O. Make
preparations to space out csg. & pump cement. Pump 20 bbl spacer, 340
bbls lead cement & 162 bbls tail cement.
01-24: Displace cement w/drilling mud; bump plug; test to 1500 psi -
15 min. RD Dowell. ND flowline; pull mouse hole; unbolt and pick up
drilling riser; Run in w/½" pipe tag cement at 30'. RU Dowell; pump
top job; RD Dowell. RD diverter line. WOC. Lay down leading joint;
ND Hydril; NU speed head. NU BOP stack chokeline, change out pipe
rams. Install test plug. Fill stack with water. Pressure test BOP
stack - 350 PSI & 3000 PSI. Test manifold to 3000 PSI. Test hydril
250 PSI & 2500 PSI. Remove test plug. Install wear bushing. PU BHA.
TIH. Break circ. Test csg to 1500 PSI - 15 min. Drill out float
collar. Cement. Float shoe. Drill to 2235'. Pull up into csg.
Test csg. shoe to 12.1 PPG EMW. Drill and survey 2235' to 3127'.
Suction line to both mud pumps plugging up Cleaning up suction
lines.
01-26: Pull nine stds. to surface csg. shoe. Clean out suction
?pits, suction lines and pumps. Test pumps. TIH. Pickup Kelly.
i~iDrill & survey w/MWD from 3127' to 3601'. Circ. and condition mud.
~.iPump pill. TOOH. SLM - no correction. LD MWD. RU Schlumberger.
~{TIH w/DIL-LDT-CNT-GR, Log. TOOH. RD Schlumberger. TIH. Tag bottom.
No fill Pump pill TOOH laying down DP and BHA. Pull wear bushing
Install 9 5/8" rams. RU csg. crew. Running 9 5/8" 36# csg. K-55.
Kuparuk River Field North Slope Borough, Alaska W.I. - 50.58467%
Milne Pt. CFP No.51- CONFIDENTIAL
A_PI No. 50-029-21271. Ak. Permit No. 85-8. Elevation: 59' KB.
Location: 303' FSL, 2075' FEL, Sec. 24, T13N, R10E, Umiat Meridian
01-27: Run in whole w/9 5/8" 36# K-55 csg. Total of 91 jts. Csg
shoe @ 3590' and float collar at 3509'. RU Dowell. Circ. and recip
15' strokes. Pump 100 bbls fresh water, 120 bbls Arctic Pack, 250
bbls Class G w/2.0% CaC1 + .2% D-6, 372 bbls displacement brine 8.8
ppg. Bumped plug w/1500#. Floats held. Closed 9 5/8" pipe rams
after Arctic Pack returns to surface. RD Dowell. ND BOP at adapter
spool. Set 9 5/8" slips. Land csg. Cut off csg. Dress stub.
Install tbg. spool and test. Install adapter. Studs too long. Send
to Tri-State. RU Gearhart. Run CCL-GR-JB-Gauge Ring 8.60" O.D. CCL
did not work. Second run CCL-GR. Run Gyro from 3500' to surface.
Running wireline set model "D" packer .
01-28: Finish running Baker model "D" Packer on wireline. Set
packer. TOOH. Packer still attached to setting tool. Rerun packer.
Set top of packer at 3315' KB. TOOH. RD Gearhart. Install 3½" pipe
rams. Set test plug. Test BOP to 3000. Remove test plug. Install
wear bushing. RU to run tbg. Pickup Geo-Vann 5" perforating guns.
Halliburton LPR ball-valve, APR valve and RTTS packer. PU and run 3½"
BTC tbg. Tag top of packer at 3331'. Call for wireline unit. Wait
on wireline unit. RU Schlumberger. TIH w/GR. Located packer at
3331'. TOOH. Space out. Rerun GR. Log short run. TOOH. Lay down
Schlumberger. Set top of RTTS packer at 2854'. Test annulus to 500.
Pressure to 1500 open LPR. APR failed. TOOH. Change out APR. Start
in hole w/tbg.
01-29: TIH. Fill 1000' of tbg. w/fresh water. Set packer at 2854'
KB. Test annulus to 500 psi. Open LPRN valve at 1500 psi. Drop bar.
Perforate intervals 2905'-2925'; 2940'-2975'; 3020'-3030';
3085'-3110', 3145'-3205'; 3220'-3310' w/12JSPF. Water to surface 14
min. Well flowed 25 bbls. Flow stopped. Shear out APR valve at 2500
psi. Reverse out tbg. w/8.8 ppg KCL. Pull 10 stds. Try filling
hole. Well taking fluid. Mix and pump gelled pill - 30 bbls. TOOH.
Lay down Geo-Vann guns and Halliburton equip. TIH w/csg, scraper and
seal locator & tbg. Fill at 3292'. Pump 25 bbl Gelsweep and 120 bbls
brine. No returns. Spot gel pill. TOOH. Lay down scraper. Make up
8½" bit TIH. Tag fill at 3331' RU to circ. Pump Gelsweep. Tried
.~circ., no returns. Spot gel pill. TOOH. RU to run gravel pack
equip.
01-30: Make bull nose on end of gravel pack screen. PU 5½" gravel
Pack screens and 5½ blanks. PU and run 2 3/8" inside 5½". PU Baker
"SC-l" gravel pack packer. TIH w/3½" BTC tbg. Tag at 3229' KB.
TOOH. Lay down gravel pack screens, blanks, 2 3/8" tbg. and Baker
~ packer. Lay down 39 its. 3½" tbg. Pull wear ring. Break apart
~i~!Kelly. TIH w/72 its. of 3½" BTC tbg. and land tbg. at 2249' KB. RD
Weatherford. ND BOP stack. NU tree.
01-31: Finish NU of FMC tree. Tested tree to 3000 psi - 15 min.
Pump 20 bbls diesel down 3½" tbg. No returns. Pump down annulus 134
bbls diesel. RIG RELEASED @ 10:00 p.m.
Tom Painter
Division Manager
Conoco Inc.
3201 C Street
Suite 200
Anchorage, AK 99503
December 23, 1986
Mr. Chatterton, Chairman
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99503
Dear Mr. Chatterton:
Temporary Shut-in of Production and Injection Wells
Within the Milne Point Unit
As you are aware, Conoco et al. has filed an application with the
Department of Natural Resources to temporarily discontinue production
operations at Milne Point. The attached sundry notices are intended
to serve as notice of the pending temporary shut-in of all wells
located within the Milne Point Unit.
There are 19 active and 5 inactive production wells at Milne Point.
B-3, B-4A, B-6, B-9, B-10, B-11, B-13, B-15, B-16,
C-i, C-2, C-3, C-4, C-5A, C-7, C-9, C-13, C-14, ¢-16
ST~fTiC:
B-20, B-2~. ~, ~-22 C-17, C-i8
Ail active production wells will be freeze protected by displacing the
top 3000' of the tubing with a 1:3 diesel:oil mixture. %he annular
fluid levels will be monitored for leaking gas lift valves, if
necessary the production casing annulus will be displaced with a
diesel:oil mixture to at least 3000'. Once the shut-down operation is
completed, pressure surveys will be run in all production wells.
After the surveys are run BPVs will be installed and all SCSSVs and
wellhead valves will be closed.
The inactive production wells have been adequately freeze pronected
with diesel across the permafrost.
There are currently ten active and six inactive water injection wells
in the Milne Point Unit. ~-i ~[ ~ ' ~; - '' ~
ACTIVE:
B-8, B-12, B-14, B-17, B-18 C-8, C-ii, C-12, C-15 CFP-2
STATIC:
B-5A, B-7, B-19 C-6, C-10, C-19
Active water injection wells will be freeze protected by displacing
the tubing to at least 2000' with a 50:50 water:methanol mix. The
SCSSV and wellhead valves will remain open for two to three weeks
after the*well is shut-in to monitor wellhead pressure. When adequate
wellhead data has been obtained the BPYs will be set and the SCSSVs
and all wellhead valves will be closed.
The static injection wells are currently freeze protected and no
additional work will be required.
Injection water is supplied by three water source wells. Though only
one well is active at any given time, all wells are capable of produc-
ing.
A-2A; B-I; CFP-1
Water source wells will be freeze protected by displacing the tubing
to at laast 2000' with a 2:1 propylene glycol:water mixture. After
the wells have been displaced with the glycol:water the BPVs will be
set and all wellhead valves will be closed.
The E-2 gas storage well has been shut-in since July 1986 due to a
tubing leak. The wellbore is filled with natural gas so that freezing
is not a concern, but to prevent potential corrosion an inhibitor will
be displaced into the well. A 50:50 methanol:water mix will be used
to carry thc inhibitor.
If you have any questions on the shutdo~m procedure please contact
Don Girdler at 564-7637.
Yours very truly,
Painter
/~v{s ion Manager
~.-~ STATE OF ALASKA
ALAS OIL AND GAS CONSERVATION COM. ,SION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon ~ Suspend [] Operation Shutdown _ Re-enter suspended well r,~ Alter casing
Time extension ~ Change approved program [] Plugging ..'% Stimulate ~ Pull tubing ~ Amend order [] Perforate !'20ther,,-~
2. Name of Operator 5. Datum elevation(DF or KB)
Conoco Inc. 59' KB feet
3. Address 6. Unit or Property name
3201C Street, Ste. 200, Anchorage, Alaska 99503 Milne Point Unit
4. Location of well at surface
303' FSL, 2075' FEL, Sec. 24, T13N, R10E, U.M.
At top of productive interval
241' FSL, 2759' FEL, Sec. 24, T13N, R10E, U.M.
At effective depth
N/A
At total depth
267' FSI,, 2935' :FEI,, Sec. 24, 713N, R10E, U.M.
7. Well number
CFP-1
8. Permit number
85-8
9. APl number
50-- 029-21271
10. Pool
Kuparuk River
11. Present well condition summary
Total depth: measured
true vertical
3601 feet Plugs (measured)
3430 feet
Effective depth: measured N/A feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor 80 ' 16" To Surface 115 ' 115 '
Surface 2150' 9 5/8" 502 bbls 2186' 2108'
Intermediate
Production 3556' 7" 250 Sxs 3590' 3419 '
Liner
Perforation depth: measured
2905'-25' ;2940'-75' ;3020'-30' ;3085'-110' ;3145'-205' ;3230'-310'
true vertical 2756'-77';2791'-24';2867'-77';2830'-54';2987'-044';3059'-145'
Tubing (size, grade and measured depth) 4½", L-80, 2513'
Packers and SSSV (type and measured depth) Submersible pump packer @ 2347' "
12.Attachments
Description summary of proposal '~ Detailed operations program f-J BOP sl~btOl'i :[] ':
13. Estimated date for commencing operation January 1987
14. If proposal was verbally approved
Name of approver
Date approved
15. I here,by-cer, tify tha¢ the foregoing is true and correct to the best of my knowledge
Signed . x ~ Title ~,,. ~_~ .... ~.~_ =-_~_. ......
Commission Use Only
Date
Conditions of approval
Notify commission so representative may witness
[] Plug integrity ~ BOP Test Q Location clearance
Approved by
Commissioner
Form 10-403 Rev 12-1-85
JApproval No. 7,'~ ?
by order of
the commission Date ~6::~~ ~
Submit in triplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL []
OTHER []
2. Name of Operator
Conoco Inc.
3. Address 3201 C Street, Suite 200, Anchorage, Alaska 99503
4. Location of Well
303'
FSL, 2075' FEL, Sec 24, T13N, RiOE, U.M.
7. Permit No.
85-8
8. APl Number
50- 029-21271
9. Unit or Lease Name
Milne Point Unit
10. Well Number
CFP-1
11. Field and Pool
Perforate
Stimulate
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Kuparuk Ri vet
52' KB I 47437
12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
[] Alter Casing [] Perforations [] Altering Casing
[] Abandon [] Stimulation [] Abandonment
Other
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
This well was brought on as a water producing well on 11-29-85, and its status
should be changed from suspended to service and classified as a water source well.
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
The space be~/~'for Commission use
Date
Conditions o~APproval, if any:
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
John R. Kemp
Manager of Alaskan Operations
Conoco Inc.
3201 C Street
Suite 200
Anchorage, AK 99503
October 11, 1985
Mr. C. V. Chatterton, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mr. Chatterton:
Enclosed please find the "Well Completion" forms #10-407 from Conoco's
Milne Point Unit wells No. CFP-1, CFP-2, B-5A, B-6, B-7, B-8, B-9, B-10,
B-ii, B-12, B-13, B-14, B-15, and B-16.
If you require additional information concerning these completion forms,
please contact Jim Hand at 564-7640.
Very truly yours,
hn R Kemp
laska Operations
lb
RECEIVED
o 1985
Alaska 0ii & 6as Cons. Comrnisslorl
Anchorage
STATE OF ALASKA -.~-~-
ALASKA,__.,_:AND GAS CONSERVATION ~..__ .MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
Water Supply Well
OIL [] GAS [] SUSPENDED ~ ABANDONED [] SERVICE
2. Name of Operator 7. Permit Number
CONOCO, INC. 85- 8
3. Address 8. APl Number
3201 C Street, Suite 200, Anchorage, AK 99503 50_029-21271
4. Location of well at surface 9. Unit or Lease Name
Milne Point
303' FSL, 2075' FEL, Section 24, T13N, R10E, U.M.
At Top Producing Interval 10. Well Number
CFP No. 1
241' FSL, 2759' FEL, Section 24, T13N, R10E, U.M.
At Total Depth 11. Field and Pool
267' FSL, 2935' FEL, Section 24, TZ3N, R10E, U.M.
Kuparuk River Field
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
52' KBI ADL
12. Date Spudded 13. DateT. D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116- No. of Completions
1/21/85 1/26/85 Suspended 1/30/85I na feet MSLI One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost
3601, (3430,) 3505, (3336,) YES [] NO [] na feet MDI 1800+
,,
22. Type Electric or Other Logs Run
DIL-LDT-CNT-GR/Gyr o-CCL-GR
23. CASING. LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WI. PER FT. GRADE 'TOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED
13-3/8" 72# K-55 0' 2186' 340 bbls lead cmt,
162 bbls tail cmt.
Top job to surface -
9-5/8" 36# K-55 0' 3590' 30', 120 bbls Arctic
Pak, 250 bbls Class
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
2905'-2925' 3-1/2" 2249' na
2940 '-2975'
3020 ' -3030 ' Tertiary Sands 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
3085!-3110! DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
3145 ' -3205 ' None
3230 '-3310'
Tubing conveyed 5" Hollow carrier 22 gra~
125 pf
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
I
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO
4/7/85 102 TEST PERIOD ~ 3170
I
Flow Tubing Casihg Pressure CALCULATED~, OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 14 0 24-HOUR RATE I~ 1300
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips a'nd presence of oil, gas or water. Submit core chips.
RECEIVED
Alaska 0il & Gas Cons. Commission
Anchorage
--
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
. - : : -. ....... .'...... ' 7-! ~_.: .:.. .... .: · - F.~)RMATiON:;TESTS , .'. ;'.
: GEOLOGIC MARKERS' ' '
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Marker 2736 2599
"A" Sand 2891 2745
"B" Sand 3133 2976
"C" Sand 3219 3059
,,D,, Sand 3350 3186 .'
Marker 3494 3326
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed__ ~ ~~--~-~~ Title Engineer Date ] 0-22-85
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so State in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
NL
Apri 1
25, 1985
Directional Services
Pressure Services
Chemical Transmission Systems
Conoco, Inc=
Mr. Dan Robertson
5201 "C" Street, Ste 200
Anchorage, Alaska 99505
Re:
CONFIDENTIAL
Our Boss Gyroscopic Survey
Job No. AK-BO-50007
Well: CFP-1
Miine Pt., Alaska
Survey Date: January 27, 1985
Operator: T. McGuire
Mr. Robertson:
Please find enclosed the "Original" of our Boss Gyroscopic
Survey on the above ~ell.
Thank you for giving us this opportunity to be of service.
Si ncere! y,
NL SPERRY-SUN, INC.
District Manager
Enclosure
cc: According to distribution list
NL Sperry-Sun/NL Industries, Inc.
P.O. Box 6207, Anchorage, AK 99502-0207
(907) 563-3430
RECEIVED
MAY 0 6 1985
Alaska Oil & Gas Cons. Commission
Anchorage
CONOCO INC.
CFF'=-I .... .... ': .:: ,.::::?.:.::'. COMPLITA]F'I ON '. DATE:!:':'.i'::i::i:'!:i :?..:i;:~!.i:.:)ii::' :::::::::::::: F;::::: :::::i: ] lOSS i.!;': GY~;COP I C SURVEY
M I LNE PO I NT }:i i:'ii:!'.?:!i:i'.i:::.i!.:'-IANLIAR Yi?:28 ,:.'::;::;.i::: i "..~'85 ;~i~.~iii~i~i~¢:i~ii~:~ii~i~i~i!!:~i~j~ii~`.i;;;i!~i~;:i~i:ii~iiii:;i;::..; lOB '.:' NL~MBER' AK' BO- 500Q 7
ALASKA : :. ,:,: },.:::};¢;;f.:'!';:;'i:;:'ii:i:;;!!:!'ili:i;;:;!iii;::::'ii!!;;¢:i!'il;!!:iii~¢ .,:::::.. :! ::~; ~iii;i;!i~!~'. ,!:ii'.i;',ii!!i ~ii~i~¢:Ii??!¢i;! KEEL¥ BuSH I NO ELEV
VERTICAL SECTION CALCULATED ALONG CLOSURE ," .":,:,,:.,:,.. ,
...
. . .
.~ . . :.... ,. . .. ~;i.!:::,4~ :...':.:... ,.::..
' ':.' ".' ' ' .... ,,~!,!" :",' :,': ~':.'"'"' :: :"'.,;".:~ :';'::? ,: :" ,':':~ ' ... ', "<.;i:'¢ .~'._
' '...;' '.:f,.'...../..f¢.' i..: ?' ::'.b :;}:.....;::...;:{Ed.;';5::Z::'::;;;::.;,f' ;:f');'.. (1%.'.' ?:"':?.;::?.',2:.!::?L ::'.;¢:}'i...,'.?:.!!.!..?'.';,.:':?H:.;'i.i::? :5'?}:'::: ::":.,':.'.:.:./ ?f:!':':';'.'.'..! 2.'~::';;!;!:.":.;?.~:.:; (2...:'.!fi!.':;i?.....'.../:.:¢::.:?:¢;(~.;¢¢.;!? ((.i;i;.f:::~¢?:~.;~:?i;;~i~:i::(i;:~,:~i::'.:.;;if:ti~;!;. (¢X.}i..: fii~i;i!:'il !iii:;':;:.'.:,':;/'. :"':'/...'.".fl ;;.'..:".':".:: :' .";... :'. ""-.'..
...':. :;.:..'::.:..? C:::.;::::::! :'::;::'.;i:::.'?::¢:::::::.:~:~::::'.: :'.:.: ::::::'.:!.'i:;".';:::";:?; :; ? .': %::.:::;?':
"'""'""' '""' ' SPERRy=SUN 'NEEL"S'UR'vEYZNO'"CONP'~N~"":";;':".'.: : .......... "" pAGE ' Z"
'ANCHARAGE ALASKA
' DATE':'{OR SURVEY ,.JANUARY 27,, l'-~q=. ~..,
.:
DEPTH DEPTH
, ',
;EVER'I:
0
I00
200
:::::::::::::::::::::::::::::::::::::::: 400
5OO
600
7OO
.. .... .:. ~0
·-..-,oo
..c,,~O
' i 000
1050
1 100
. i i~0
1200 '
1250 ".':
1350
1400
. i 450
"'::':':'"":" ~-' '!
i 700
1800
1900
· -::.. :: 2000
O. O0 -60.00 0
100.00 40.00 ' 0
2{.~-O~O'~J-i Y'": 3?' ':.:: ;' ':,'::'.':,. '1 4 0'": :' 0 0 ': :;: ":;:': :.:"' ::' ::' :':' ::::":'::'0: ;' :::"
.-_.-200700:440 ;l l[ 0 (j i ll:l :Il([`III: ::l ' l::l:l:[: il:: : ::~: ' ll :l[ :i: ll ill ::l:: [ Il ::l: 'il: l 0 ll:llll:'il' l ' I I l':l:l: l1
dlO0 · O0 54(} · O0 0
0 N O· 0 E 0.00 .' 0·00 0·00, 0.00
':: N .. '-.': . 0 · 05 N 0.02 W 0. ]'-'
.
:::::::::::::::::::::::::::: :::::::::::::::::::::::::::::: N' l:l:l:':::':' i 8 I ~ ;{l::l:::li i'll ~. l:::{::l:::l :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ;Il:: 0i ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: l :~ I: ::::: :: Ill N :: :: :::'::l::: ::l:j: :~::::{:;{::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ' (:~ i: :::::::i: W :il: :: II:I:'l Il:: :': : ::::: :: ::l:l:: ::: :::.:: :::I I :::: ::: l :l:: l:: {fl:O~
6 N 55.1'.-"/.' E 10 · i'-"~'.r () · 57 N 0 .7'2 E . -0 .82
700. O0 640 · 00. 0 22 N 5~.69- E O. 27 ' I :. ~ : ] ] ' ' '' ' ' O.,.OA N 1 .16 E Il - 1 · 19
104'.~, 80 98'.~1· 80 4 5 N 83, 50 W 2, 30 :. 4 · 20 N 5.62 W 51 42
~J/Jl i J i J ~ 7 ' J' '' ' '1 "1'' ~ ~ ~ J i l'~'--J-- J ''--J--' :' '' ~J J J ~ ~-- ' ':" :' ~--J~ J J m J m m mmm mm ~ J '' ' J ~JJ:J J J J m m J ~ ~} J Jm m m J JW ~ J;:lmm ~) ~-- ' Jl ' I ..........4. I 771 J ~--I I j J J J J J J J J' J J J ...,7.':' 16 ' N ,' ._~"~ -'
1346 · 19 1286.19 13 19 S 71 · 50 W 3 · 63 8 · 42 S 47.32 W 47.64
1394.66 1334.66 15. 3 S 75.80 W 4.03 11.84 S 59.08 W 59.54
14'42 '-' ' ' -' J JJ J JJ j= j j ' .... J J ' j~ ' ':j ...... ~ J ~ J j ...................... J JJ J' J: :' J ........ J ...... J J ' ....~ J j j j j ................. J ': 72.
1769.85 1709.85 24 17 N 89.39 W 2.37 24.10 S 195.49 W 1'.-.-,6.37
1859.97 1799.97 27 3 S 88. 0 W 2.98 " 24.68 S 238.79 W 239.65
· '.
..::, :%:.,,,';.
:. :..:, .., . . .
ANCHORAGE ALASKA
CONOCO INC DATE OF SURVEY ~ANUARY 27, 1 ..... ,
- I ' 9:z¢~
::i:;i.'.iiii:!:ii!i:iii!:ii::i:iiiii~i!i.i:.;[.~i:ii?ii'.?il;ii'.!:ii'?.:,:: ~.:...~.:...~,::'. ;~..: - :?:.:. · .=, 1 r.... :;:.! :....:!.::.....,. L B ..NL MBER AK-BO-..,O007.
ALASKA ',."" .: :*",.'.. .. :..: : :"..:~' .',:.'.'.,.. ".:. ... :'..'.': ~'.:':..'i?~,;~., -' ."': ~ -. '
. ' '. ::`::::...`..:.:..::.:...::~.:.;:.;:::::::..:::...:...::..::~..::~::::.:.~::~:;;.:.;:::`.~::::.;~;;~:::::.~;:..`;;;:~.:~:::~.~::.;`:;~::.:.;:~;~:~:;::;;:~.:.:~::.:::~:~..~.~:~..:.::.:.;:..:~:.;;:~.~;;;~::~::..::.:::~:..`;:.~:`~:..:.~:~;::~..:::.;...;~.~.::~:.~.~:`~;:.::.::.::...:~:;;:.::.:.~:.::;::;:~..~:.~:~.;::~;~.;:...;::~:::~:.:..:.::.:::.:.::;:::::;~..:.::.:;;~¢:~;~:.;;;:..~:..:....:.:...`;~::::...;:~...:~.:.:::........:::.;.:..;.:.~:.:.:~:;:..~:;:~;:`~..:::.::.:.~:~::.:..:..~.:~:.;:::.;~:..;.:;.::.::..~..:..:....:::~.:::;.:::.....~::::..:.:.....:.::...::.;.::.~;:~)~.~¢;;~::.:.~::~:~.~.~;;;~.:.;~;;;~;:~;~;:.~:~¢;~;;.~:~:~::~::;:~.~..:~;;;;..;~:~.;:~:..;~.:.:~:.::::..~.;:~.~:;:::.;:.~.: KELLY BU..,H I NO ELEV, .:'= .:
: ~ O~OR=~CGLi i RE
VERTICAL SECTION CALCULATED ALONG CLOSLIRE
~ EE REE,:,i::
DEPTH DEPTH
2400 2296.59 2286 59 27 '-"--'
. ~ .'.~ W 1.
2500 .",.-,c,=' .-.,._-,..:,,=
-" o~,~,. 17
· '-~,.' ._,. 17 27o,., S 87.10 W 1.4:_-':
'" 2700
3000
3100
'320~
.
3300
3400
3500
3600
3601
2848.42
2944. ~'--::=-'.
3137.67
333 i. 46
'-]I '--' '-~
· .. 4~,..,. 41
3429.38
27:::8 42 17 7 N '"'- . .
. o;~. 19 W ~1 1:9
2884 38 15 30 N '-":',
· o;. 0 W 1.62
53.81 c.
57.45 S
61.60
61.16
480.33 W 482.24
526.56 W 528.59
11 ~47,1 ~'i:!j'i, 613' 57
,67 W .... . 650'77
682.12 W ~8'4%]'''.'c-r''~
712.53 W 714.56
740.60 W 742.5~
17.46
8368.41 14 11 N 75.30 W 0. O0 Lq,z:.'-" 39c,'-' o'-'/.:, o'-' .... q'-'_~ W 864 . 18
336:.~. 38 14 11 N 75.30 W 0.00 38.32 'S 863.56 W 864.
~PLACEMENT:. = :¥..!. o64.41':' FEET 'A = '
HORIZONTAL
DI'
-. ,.:..... ..... ... :.. : .:....,. i.:'~):~..., :/i'::,;: .:'. : ,.....
CA .C:C,L Z ON 'S S'S ,-ON Us C,S
~FERRY-:.UN WELL ~LIRVEYINo C~:IMFANY PA~31S 3
ANL. HuRA~E ALAS:~A ..
CONOCO INC.. ~DATE OF :.LIRVEY i.~IANLIARY 27, 1
OPERATOR-MCGLI I RE
,~ ,
INTERPOLATED VALUES; FOR EVEN 1.000 FEET OF MEASURED DEPTH
,
' ' .' ". TRUE' ':" ~: :':" ..... SI~'' '""' B'g::S'E ~':.:'r:";:::'"'"~ :........::' .........'..,.............'....,....,,~............:.....'............'...''" ... '~.:...: :..... :':"".~":':':'~ :':' ':'::: '~} :'":'~:'~'""::'":':':""~:~' ~: "' ~' ::: ::" *'~ T~ ~i~?".~ ~ ~ ~ ~:~ ~::~: ~' ~'.~:. :..:::'.'. '~:~::"~ :::: ':": :" '::~ ~ ~ ~ ::~:~:~:'?'~'"'?'::':':':~"~: :?::: :?":: :::" '~'""" "'":¥:':~'~ :::".: ~::: '~ ~':"~:: ::' ~.,'::::~' "' ':':"::: "":'::"'":~:::': :~': :~ ':':"'":':":'"::'"'"'":'"':~?'~:: ~"~::' ~ ~:~ ~.~}~:~ ~ ~ ~ ~:' :: ~' ':~:'?~'~:" ~ :~ :~:::~ "::: :'::":~:
MEAsuRED. ' . i-: ....'..,...'..... . '.'....'..'...' ~, ..... -.' ..." . ~ ..'. ....... ' ~..........".."..'..'.' ........... ,.' : ........ '...'..'..'.'... %...... r' .................. ..'."....'....'.' ."...'.....'.. ..... "...'." ,.'· , ....... '
' VERT I ..AE'::....:.~..'.....:......VERTI C. AL....:.'~.:.. :.:...,REE.'TANOLIEAR ... :.:...~.:.:L:OORD.~ N~TEo,."......:....:.. ~..:'. MD-TVD ...'........'...,....:~.. :..~............... VERT I ~AE..... '......... ... .' . ....
D~PT~' D~ '"":'"'"'" 'D~'~ '""?:"'"":""~~:OLiTH'''''''''''''''''''' EAsT/WE~.~..~.~F~REN~A~.`~?.~`~.~'`~'~.~:E~RR~T~ .......
0 0.00 ~60 O0 0 O0 0 O0
~ ,.~ · , · ~ 0.00.
~ 000 . 9~9, ~0. L .:.:::.~..,.:'...:....:?~::.:..:L ~'E;'~ ','..~ ~:~:~?~?~:?~:~:~:::~:.~:~:~?:~:~:~:~;~:~:~:::~.~:~`~::~:':~:~.~:~:~::~::~::: :~.:::~:.:~:':~:?~3~:::~2.~:.~:~N:::::::~f~:~?~.:~:~::::?~:~?~?~::?.~?:~?::?~.?~:~:2~:~:~.~:~:?W:~:::~:.~:?~:~:f~:~l~::~:~:?.~:~?::.~?~:~.?~:~:~:.~:~::::~:~::~:~*~:;:::~ ~:~:~:~?:~:~::~:~:~:~?~'.~:~::~.~..~:~:~::~:~::~:.:~::/.:~?~::.~:~.::.:?::~:~:~?~:.~:~:~:~::.:10 ::..':::.'...'.::.:::::~ ::'.:'...~:. :...'.~..:.~::.::.:....' ':' ::.::.. :. :..:.: : :..'....: ..... ·
zOO0 '1947.71 :' :::: :':"~ ::'::"'~::::?:.:':'~' ~ ~ ~::::.:'~:'":'~"~ "::"':::':~:::':!'~:: ::'': :~''::::~:'':''::~'::?':~:'',':'F`:~:'~::::':':,}: .~'~S'~ :.".' :;~.~'~::::::. :~::::::~.:::.~:.:~:~:~:::~:~::~:~:~::~?:::~?~.::::;:~`~:~:::~:::~::~::::A~?::~:~.~:~::?::~:::..:.~:~::`~:~'.~f~:.~:~l~:~?~?'~.~::l:~:~ ~'.:.::'f.' ~":~ :?'f.'~?Y~' ~F':~:.:?"? :'~"~':':'.:'.':':":;:~::'::'.:::":":?.:'::"'~ :~; ':' ~ ~ '::.:',:~: ::::::::::::::::::::::::::::::.':' ::":"'""'::'.:::'::'Y:'?':." :":: ::::: :'. :".'::.:":::::'::". '.":::':.:::.:".:.'":'
',.,.., .,',. ,,,:,,', ,',, ',~ ~. ~ !' ,'~ · ,',,:,, ,,,'y'. 7,,.:,:.,.,,.',:..',,'?',,,'::,~,,~?,',,v,,,',:,~, "~"~ .'I, '-- ',,'.','- .."":'.',' '"::":~,,'.',~"~,,?,~,',;":?,"~ ~ ~'m '~ ~ ',"'. ~ :,'..', ~,'?~.',"~','~?~::.,',~:~'~,' ';',:' ",,'~'~'~'.':'~., ~},l::~',, ~':~,,,'~/,'~?:,',',:',':h?.??"',~,~,,l.,',',',', '.'~ '.l,:,'" ~ ~
3000 ', 2848.42 "":?:"~"':'"':"~::":' '-' '" ::: '~":;'":":'::::;:'::"~"::":?::"':':'"i'::?'::':~?::""::; "::" ':"::::':'"' .'.:..:~':..:,~.::?:'.:{::.:.~x.: ~:.:~:.;:~.i:~?.' .. ...::.:'=.- :..'::~ .':.:.'.:~'.:.~:.:.r~.:~ :.:~ ::::~.'.'.":' :::~:~=~:~:~4:~;~f~l~{:~?~F~D~:~::~?~':~::~:~:~:~'~:~:~ .-.~ .'.'.:.':.'.'.:.:.:'..::.'.~.'.':"~:... :.".::.:: :.".:".:.:::.. :: .".:':..':':"' .'.:'.: :.'"': ..::..":" ..'.':
........~.;.. ::.:.~.. ~7o~. 4~.....:...? '~, ~. ~ ~0..::.. o.;~ :..%~????...:~...?.~.:...:?.. 71 ~ ..~L~.... W.~.':.~....?.:.?~..?.:'~?.~..?..':?.'...:~.~?~ 5 ~.~..;~::~:.~:~:~::.~.~..~:~.~:..~.~:;~:~:.....:~.~:..~:~.~;~:).~..~.~ ~ ~, ~ .... ... :...... :.........~..;...
~,0'~-~~~8 3~ ~'38':.?`:'. '":"' '"'""':'"'"'"":":'":"'" "38 ~'~;2" 8~-3.5~',"::' ~ 7 i', ':':~'""" ~0" ~'~ '. . '
'
THE OALCULATION PROCEDURES ARE BASED ON THE UE;E OF THREE DIMENE;IONAL .RADIUS OF CURVATURE METHOD.
ANCHORAGE ALASKA
CONOC:O INC. .DATE OF SURVEY dANUARY 27, 17~..,
CFP=-I' . ..:..:: :.:...:.........:...COHF'UTAT i ON :..;'DATE ?........'..,...... . ..........'....... . .
M I LNE PC I NT ANL ARY..... ~.~,.:?....,......! .. ~5.....`......`.:.:...'.:..:.:~..:~.~..`.:..:...~........~:`>:~`:...?.....~..~``~.~...<.:......~.~...........~B...NU~ER AK-BU-.,O007............., ....'.... :...........
ALASKA II 'l !:'::!:i ~[~':[¥.:..:~qs" z ~.~. [~u :..~ :" ~::::?':~:::'?::~,0'~:0o:.." F i:
"""'.'.'"" ...~....~....~............`........`......~..:....~............~..`....~......~......~`...~......`.~........`........~.~........~............`...........~..~...`..~....:.:...~.......................~...~...................~..........~..'....~.....~..........`.....`..~.........'..~.'............':.~......'~.~..`....:.......~.'.....`..~.....~..:..`...............~:.:..........~.~............:.........~.....~......~............~.............~....`.......`..~.~..:...~.'...~..`:.~..:.......:..~`....~..~`~............~..~...........:......`~........~..``...~'.`..~..`....~`:.:.....:..~..............~.~`~aAY~m~:~.~.~ ' ' ""
INTERPOLATED VALLE:~ FOR EVEN 100 FEET OF SUB-SEA DEPTH ~ ,
,, , T, .,,,~ ,,,,.,, .> ,,; .:.,',, ,,,.%,x,,.,,,',, ,,,,,, .,, ,,,,;<,,,,, /,;. ~,,.: ,,?~'].. ',.;' j,: ,~,,.,,.:,2,.,,,,,,,, ', ,:,,,, :,,, ,, ,."',, ,',,,,.,',,. ,,,,..." ,,,:, .' ,,.,,, ..,
,........... ......... ........ ....
~ [ ~ 11 ~ g ~ :.,......: :..~, .: ~ [ ~ 11 C. g ~ ...:....: :..:...:~ ?..: ~ ff C I g ~ C~ U E g ~:: .,..: :~... C. 00 R B i ~ g T ~ ~. ,..: ..> .:.::? ,: ~ ~.....' .:... ~ D. ~ .~ B .?.?~ ~. ,.....:.~::..:..:.. :.:.:.: :.....~:.. ~.. ?:: ..:.,:: ~ ~ ~ T. I C. g ~ .:."'.. :.' .': ~'.. >.' :....,.',..?.~ ... :..., '.:' :.. :..: .' ....:. :. :.: ..'.,.,' '...: ? :...:..'...~
r~sm.~ r,~[~,, '~?"':~:' D~~~Oa~Soc~*.,'"'?: ~asmm~s,%""?"'::~i~'~~Nd~'?:"??':'?<'~:o~c~.~ o~'~ ~:'-:::: ."" :'::'.: .' .... .' ~
0
60
1,60
460
760
1060
1160
i2~zi
1364
1467
1573
1680
1789
0.00 -60.00 0.00 0.00 0.00 ' '
,, 60,,0(:i :, ,.: ,:,. ::::,,:',.::,,, ,,,:,,,:.: .:., :, .~(~::::::.::::~:):::...:::.::)...~:..~..~...:.......:.:):.~:..:::..:..~:.::~:~:..:~:~:::..:..:.:.:(~i~(i~.:::..:.N.~:::.::.:..:::.::.::.::.::~...~:.:..:::.:..~:.~.:.:..:...::::~::~.::~..~.~:~.~".~i:i:.....~..::.:~:..:.:.~.:.~.:~.:::~).:.:.:.:...::........~...:.:..::..:.:.::~:.:.~:...:....~..:..::~"~..:::.:~:.:..:.:~.~:`..::::.:::..:~....~:.::.:.~:..:~.:..~:.::.:.::..:.:.:......~:~:...:...:.:....~..:.::::...(i;Cii:~ ,,.,,..:, ,..,.,,,,, , ,,
'"': '~/-" "' ~'" ":"::::":::::"':":'""':""~:¥:';':':~':~Y':':':'~:":'~'~":??:":"::'" '":'-"~':":" '":~'~:;')'?:':'~')":":':':'¥":":':'"::'" "~'""' ''?': ~' ~'''''':'~ ::":::;:": '~¥~:':"~)' '' '~''' ~::~'';': ' ' ' :' ': ' ·
, .. ,, ~ _,0. O0 ::..:.:,:::,:.,',?~::,:,,;:~.:,.::.:'~00.00 ..::.::..'::........:.:.:..:.c.....:..::....:.:.::~..:::..;~:::::;;.::.:....:...:.;:...C~ .' '~..:' N.',..,?,:.:::..',,,,,::,:,,?,.::,:.,,%~:,:~::%,,::,..0. O~ E.~:.....::.....:..:~.`:.:....~:....:~...~...:...::::.~;..::.::::~.:.~:..:~.....:~..::.` :0 · ~..~.......::.~.~..'.::..;:~.:.`~:~y~..:'.v.:...:::;`:?.``~<...:?..'.:....:.`...... 0.00'..... ,,.,:, '...:.. ,, ', ..... .
~,~1./ ..... ' ::":'" ~~1.~" " ( ~ .... ~(', IN ~1~" "' ' ~/:" ='"'"'~1~.~ .... (.J" ~ I~(' 'l '" "'" ' "'
460 O0 400 O0 0 44 N 0 ':'"' '
...... ,~ El 0.00 0.00
m m ~ · ,' ' I ' ' ~" '~ '
560.00 500 O0 ~0 ,3 N 0 73 E' . ,'0.00 0.00 ,"
6&.O. O0 600 0. ~.6 ~::.:iq::..?:::~::,,.>:¥.::;::,::;::::::F>~¥:::',.,' 0 ,':::~i:':::;: :,:. ?: 0 ,: O O,:~ 0' O0 ,'.,::,:.::,:.:.::::, .:.
~f O. OO 'o ) ' ::::::::::::::::::::::::::::::::::::: ':?:.~,::~:??:~::~:',.?~:?':~':.:: ::~::;:~:'::',::,:,'~::.~"::;:::'~,":~,~:~:::;:~ :.~::::.':: ','::. ] ",'.'. '. '. '.
...... ,....:..,,, ::.:,: ~.C O. OC 1 .. ~ ,. N.:.,.,,,:.,,,,.:,,...::::~:,,:,.,,,,,...,,.,::, I ,.74 ,...E O..C O. 0 ..,. ,, .,,.' ,. ' ,.
:~~}0 """'"'::':' ~0; O0::'::''::''':'''::'v'' ~ 2~'::'N''':''::':'':'::''':::?'''??~:::%':' '' ' 0 '" ' ' '""" "' "" '"
1060.
1160.
1260.
1360.
1460.
1560.
1660.
1760.
O0 1000.00 4.28 N 6.34 W 0
O0 1100.00 3.3'.~ N 15.~5 W 0
· .. .../ ~ .,.,.:'
O0 12'00. O0 :. ' ..:.... :.:... 2,03 ~ ~0 -~ ...........
'""--, ' - ':"' ':" ':':" ~ ~ ':-'".:'.' ..... ..."'.': ~,- 46.:w
O0 1 ._..30. OU .'<.. :/.,-t.j o :.. :'.,:.::...'.:: ,..,,.
00 .::: :':i:::! !:?i!::!: 1400 ::::::::::::::::::::::::::::::::::: ~. 40 ."::: s "::?: :::::::::::::::::::::::::::::::: :.'77 '.2:' 1: w
.'. ,. :.:....... :::::.:..' :.:.::,...: '.: _ _
O0 i oou. ou i :~. i e, S ' i u'..-,./.'_~ w i :~
O0 1600. O0 22.32 S 147. ?~5 W 20
00 1700.00 24.14 S 1 '..~ 1.04 W 27
.22 O. 17
.71 ' 0.48
· .. :,......, : .., .... :.:.:.:..,.:., .. . .. . ~ .i 2i
..',~ ~ .:;::ii:~':::;~:.:~::~:il :::i:: ::::::::::::::::::::::: :.:' i:'.:.'..::":.:' .-~ ·
. i / 5.26
.27 7.09
· 19 8.93
x, '. /. y.'.~'~. '...
'1~ '" ~ -~,:~, . . , ' , , ' . ,'" · .t , ~ '.
...
--,. -
........... SP~RRY-SL, N 'WELE" SURvEYING""CC, MpANY . ' ............... PAGE
ANCHORAGE ALASKA .,~
CONOCO INC. '" 'DATE OF SURVEY dANUARY 27, 1985
CFP~i-
, ::, ,..,,, :,. :.., :,", :'::, :,':::,:::: :,,:,/ :::,..,, ,,,: ,.: ::: :,,, ,,:, :,,::::,:.,.~:.:,'::.,:, '::,,':::,:..:.:,' :,,:: ','.,:,: L.I_IMF LIT~TI I. IN ,, DATE :'::::,:: :::,;,'~,:',~:,:',:::::::~:;~:,,::::,:::.'::.:,', :~t,':,'.:,::',,'::::'::',:,:'::,:::::':, .., :' :',,,::,: :,:,~,,::::,.,, ,.,:], . ' ",
M I LNE F'O I NT : ~:::::':~,,::: ~IANUARY ,,::28 ~ ':':::~:'::, 1985 ~: :~.~:~;~:~:~,~}~:]~;~ ~'.:[~:~:::,[~..~:~::~:;~:::~IOB::~ ~,:~UNBER '": ":':"
AK-BO'50007,":~';~ '
:" ALASKA ' ~ ~;'~"~;::~,:':~ :~:.~'~:~:~'::~:~;'~ ~:~:~:.. :' KE'~:EY "BUSH I NO ELEV.
' ..... ' ......... '"'
~NTERPOL~TED VALLIE~ FOR EVEN lO0 FEET OF SLIB-SE~ DEPTH ~',
,,,.,..,,,.,,
DEP~' ' DEPTH-D~ "' "'"'"" "":"'"' N C~R T ~E~'''''''''''''`''' ' ~R S i' / ~ S ~ :'": :'"" :~i"'~"F F ~RE N [~""'"'"'"':'"'"'~:'"'""?'?'"'"'i~oRR ~TO ~:" "" ' '"' ":" ""'"""' '
1900 18~0, O0
', 2o6o; 00
2130 ," ,, .,,,,..,,, ,,,.,.,,,,,'~.,,,,,..,,,.,,,,,,,.,,,,,, .... ~,.,- - .,.., ....... ',,,,',.,.,,',,,.,.',.,',,,',,,,,,,,..,,,,,.,>,,',',,,',,,.,,.,..',,,.,' ..... ,.,.,.,,.,,.,~,,,,.,,~.~.,,,,.,,.,:,,.. ,,,,,,....,,,,.,.,,,,,.,..,,,,,.,,.,., ,,,.,,,...,,,,,
0'],~ '-; " ".',.' ' ~,"'" - '~",","" .... "'
~ ~ ~ 60. UO '.,... ....... ',..~ ~00,, OU. 44.,'"~ ( ~;'4 .................. ",'"" ','".',",',' ,",'"'.".",'.'.' '~ ~ .' ,-,'-~
. , , ,.j .... ~ ~-. ',~,;;'X~.'.,?.:;~'?~.;'.:};F./';:),~.';'::~?';',-- '- ~'.~ T ,~.~.
.:,._,o "2~,0- O0 ' ...... 5i ' 76'"S "'"'" .......
2471 ~¢,o"'~"_,u. O0 2300.00 56.78 S 513.39 N~ , 111.58 ' 1~'~'.88',
~.-,:,~, 2460. O0 2400. O0 ~,~'-;~. 1 ~ .:,'-' 563. "~u' W ' , . ' 123.65 12.' 06
280'26~S1 ' ' 25602660..
: oi2 2 6o. oo'""'
3116 2960.00 2900.00 61.08 S 744. '~3 W 156.21 4.09
$ '1 . -- '. c,. 48
-:2 ~ 3060 00 8000 00 ~9 5~ S 771 47 W 159.68
m -- . m m . ' ~
' :3~:~: :3 ~~ 0
'. 342~ ' 22A0. O0
- - ... 0 ~ ~ .?::., -- ~ m~ ,.~_ ~m.. ~ .~..:,.
6~, :::.,~, 1 ..~ ...::.":'.- ..,, ::. :...?.'.,.',. ,~ '~:'.
~ .. ,' 4~ ..~ ~ '.:.:,..:::.
~;~0i c;~:~. ~; ~;:~. ~:~ 3~, ~ ~ '~AL~.'5¢g' N ......... i/1.6~ ~.1'~' ' 8
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN :- '
: ., THE-NE-AREE~T-~.'O-FO0 , ~ _ AD i US. OF.. CI_~VATLiRE ). PO iNTS · .... ::::::::::::::::::::::::::::::::::::..:..:...:" .:...:... :'...:': ....... ..:,..., ... . . · -
Suggested form to be inserted in each "Active" well folder to check
for timely compliance with our regulations.
~RATOR, WELL NA~E AND NUMBER
Reports and Materials to be received by: .... .~---.~ ~!-~ f ~'/
Date
Required Date Received Remarks
Completion___~.__.___~ .... Report_ Y
Well History '~-~ ~
Mud Log..
Core Ch~ps
Cor~-Description
Registered Survey Plat~m~ . ,-~
InclinatiOn Su~v'EY
Directional Survey
'Production Test Reports
L. FJ. 04
STATE OF ALASKA ~z,/
ALASKA ,r~L AND GAS CONSERVATION CC~MISSION
MONTHLY REPORT ,..a= DRILLING AND WOR..OVER OPERATIONS/ '
1. Drilling well (~X Workover operation [] --'
I
2. Name of operator 7. Permit No. J ~
I
Conoco Inc. 85-8
3. Address
3201C Street, Suite 200, Anchorage, AK 99503
4. Location of Well
at surface
303' FSL, 2075' FEL, Section 24, T13N, RiOE, U.M.
5. Elevation in feet ([,d~.ete KB, DE, etc.)
52 'KB
t 6. Lease Designation and Serial No.
ADL 4743 7
8. APl Number /~/'~
50-- 029--21271
9. Unit or Lease Name
Milne Point Unit
10. Well No.
CFP No. 1
11. Field and Pool
Kuparuk River Field
Kuparuk River
For the Month of Hay
85
,19__
12. Depth at e~d o! mona, foma~je drilled, fishing iobs, directional drilling problems, spud date, remarks
None.
13. Casin~j o~ ~ne~ run ~ q~nfities of. c~r~e~t, results of pressur9 tests
None.
14. Corin~j ~e~,rne and b¢~ef de~cd~tion
None.
15. Lc_~s_ run and depth wber~ run
None.
16. DST data. perforadncj da~a, shows of H2S, miscellaneous data
None. Well suspended. Completion report to follow.
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
SIGNED.. ~~ ~ //~ ~.-¢_..4~$~;~,~,,,. TITLE "-~"'7""v"~' f, rbJ. ~.. DATE ~ ~/VZ
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10~04 Submit in duplicate
Rev. 7-1-80
" ~-. STATE OF ALASKA (~/(~_ ~..~
ALASKA iL AND GAS CONSERVATION C -~'IMISSION
MONTHLY REPORT OF DRILLING AND WOI KOVER _ OPERATIONS¥
· Drilling well [] Workover operation ~ ~
2. Name of operator 7. Permit No.
Conoco Inc 85-8
3. Add[ess 8. APl Number
3201 "C" Street, Suite 200, Anchorage, AK 99503 5o-029-21271
9. Unit or Lease Name
Milne Point Unit
4. Location of Well
at surface
303'FSL, 2075'FEL, Section 24, T13N, R10E, U.M.
5. Elevation in feetB(~(ilndicateKB KB, DF, etc.) I 6. Lease j~)tgn~;;)~y Serial No.
March
For the Month of
,19__
10. Well No.
CFP No, 1
11. Field and Pool
Kuparuk River Fie]d
Kuparuk Ri ver
85
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Workover rig MTRU 3/13/85. Found collapsed 9 5/8" csg, Backed off 13 jts, csg, POOH,
RIH with 9 5/8" csg. Cemented with 150 sks. Permafrost C cmt, followed by 110 bbls.
Arctic Pack, Gravel pack well after casing repair. Flowed 432 BWPD on 3/31/85.
13. Casing or liner run and quantities of cement, results of pressure tests
14. Coring resume and brief description
15. Logs run and depth where run
6. DST data, perforating data, shows of H2S, miscellaneous data
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
SIGNED
AP, i: 2 2 1985
Amsk2 0il & G;~s Cons. Commission
Arichor~ge
DATE
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 Submit in duplicate
,~, STATE OF ALASKA ~._ /~ f~
ALASKA ~.,~.AND GAS CONSERVATION CC ~VIISSlON t,,- ~
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
1. Drilling well ~ Workover operation []
2. Name of operator 7. Permit No.
Conoco Inc. 85-8
~3. Address 8. APl Number
3201 "C" Street, Suite 200, Anchorage, AK 99503 50- 029-21271
4. Location of Well
at surface
303' FSL, 2075' FEL, Section 24, T13N, R10E, UM
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Desiqnation and Serial No.
52' KB ADL 47437
9. Unit or Lease Name
Milne Point Unit
10. Well No.
CF? No. 1
11. Field and Pool
Kuparuk River Field
Kuparuk River
For the Month of February
· 19 85
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
NONE
13. Casing or liner run and quantities of cement, results of pressur9 tests
NONE
14. Coring resume and brief description
NONE
15. Logs run and depth where run
NONE
16. DST data, perforating data, shows of H2S, miscellaneous data
None, well is suspended. Completion report to follow.
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
SIGNED /"~' /' /'~~ TITLE ~"'e"'~er'M'ld~ ~- ~ d.- ~a-,,j~. DATE
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 Submit in duplicate
SCH LU M B,rEF?GER - ~--.-, ,,-
OF r .~O'-'°c ~-~
_ . . ,,.,; S ERVIC,-::~
3 .:: :.; .i C STR ZE'P
----G{ >-V ........ :1'~-77 [---~ ...... i): ........... F"
r~ z,. N
J
A Divi:,ion of $chlun:!)e'rgar ,_
lqOUS'TOi'(. TEXAS 7700;
APR. 85
PAGE 1 OF 2
-' '": . _g'.ntS &
CO;50(~'C), INC OFPqNFN~E ~v-,r ~ :~m r
............ d, =% 2~ U~)I~ ~! i ~ ~'~ Pi
.............................................................
I2 ~:,'i ?, W~ T ~7-f Q T/liN! O ,'-~ D;'~xi z~ A A .4
........... ',"- 7 V '~ 5 2
i{O!.JL~T(JN ~ i A , . ~
.........................................................................
.............. !_
...............................
...............................................................
i D:':b , x.- I !:: F'
.......... p r}ni-_-;
CO:':-EiC'C,, i NC.
p i;'; S r,'-;-:-' ":'n,,;:;,-~ o
...........................................................
¢-.: .- . ,
u;, 'i' :-,i!OR~; .... i ;:-'"' i~
.........................
'P~O. BOX ~ [97
....................................
?, r pr~:-:, i
z*- .,_ 3_ ;_;: 0 ('- ~-- -r -~;' r
rm,-- :.-r',,-,,-'-. T ..'--:r,
__~-.? ~"~ ~ ' ~- ':.&i_ ~_'-~'---' ..............
.~.._ , ._.. _~ _ !__.._.- _.~ '~ ..... _L -._.'_ -. , ._,
_ _,.4,,_ __,_~_ ~:, .v_ ,':., .................
A'I:'I'N- }i ,"q. GiLLiI:A:'N;--/c
_- -: ............................. ,_. o 3 5 ¢5
The fiirn is.____r?__~_;qz;n_eQ_.to __CONOCO
We appreciate 'the privilege of ser'_,irx2 you.
SCHLUM~JERG;Ei2 OF .... OP.[E q
A Division o{ Schlumberger Limited
HOUSTON, TEXAS 77001
PLEA~;LE REPLY TO
CONOCO, INC.
Atteniion: DAN NO =' ~ ~' '"'
POUCH 340069
PNUDJ:]OE BAY, AK 99734
ATTN: BAR BAJR A HARRISON
PAGE 2 OF 2
Gentlemen'
2
Enclosed are .......... prints of the.
~o*- ......... CONOCO, INC.
i"~J-~ PO__ ;N i
Fie{d -~ ~.-,~7 __ T~.~
2" & 5" DIL, FDC/CNL ......... on:
Addi.:~.~ ~ .
.........
CiT!~S SERVICE OIL AND GAS
CORP,
-.
P~O. 8OX 9'39
- _
C/O ,_71b~ QU!NN
prints
......... ~,rint:
prints
D,'ints '
prints
....... prints
prints
· 4-
The film ~s__%_e]=;ky_n__e_~. to CONOCO
We appreciate the privilege of serving you.
;/,'/ .... -
· .--' ... ~FF~ ~ ~ --. ....
D.A~:
.............. ~ .................................
Alaska Oil & Gas Cons. Comrnissi~,
Anchorag~
Very truly yours,
SCHLUMEENGER L3F'FSI-,O~E SERVICES
,- STATE Or: ALASKA i~ ~
ALASKA~ .AND GAS CONSERVATION CC ~IlSSION ~1~
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
1. Drilling well FX Workover operation []
2. Name of operator 7. Permit No.
Conoco Inc. 85-8
3. Address 8. APl Number
2525 'C' Street, Suite 100, Anchorage, Alaska 99503 5o-029-21271
4. Location of Well
at surface
303'FSL,
2075'FEL, Section 24, T13N,RIOE,U.M.
5. Elevation in feet (indicate KB, DF, etc.)
52' KB
6. Lease Designation and Serial No.
ADL 47437
9. Unit or Lease Name
Milne Point Unit
10. Well No.
CFP No. 1 (WSW)
11. Field and Pool
Kuparuk River Field
Tertiary Sands
For the Month of January ,19 85
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
TD - 3601' Spud date 1-21-85, Rig released 1-30-85
13. Casing or liner run and quantities of cement, results of pressure tests
Si ze Wt. Grade From To
13 3/8" 72# L-80 '0' 2186'
·
9 5/8" 36# K-55 O' 3591 '
Cement
340 bbls. lead, 162 bbls. tail
120 bbls. Arctic pack, 250 bbls. Class G
w/2% CaC12
14. Coring resume and brief description
NONE
RECEIVED
15. Logs run and depth where run
Logs
DIL-LDT-CNT-GR
From To
2430' 3500'
F£8 2 $ ]~85
Alaska Oil & u.~ C;O/l~. ~ummissioI1
Anchorage
1 6. DST data, perforating data, shows of H2S, miscellaneous data
2905'-2925' 2940'-2975' ,3020'-3030' 3085'-3110' 3145'-3205' ,3220'-3310' wi12 jpf
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
S,ONED~T,TLE Drilling Supervisor DATE_____~~.~
.,
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404
Submit in duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
3001 Porcupine Drive
Anchorage, Alaska 99501
(907) 279-1433
Receipt of the following material which was transmitted via
/~_// is hereby acknowledged:
QUANT ITY DE S CR I PT I ON
RECEIVED:
DATED:
Copy sent to sender
YES NO ~--
MEMORANDUM
State of Alaska
/./
TO: C. V e~cton
Chai~ ~
THRU: Lonnie C. Smith ~''~
Commi~s ioner
DATE: January 28, 1985
FILE NO:
D. tlRH. 6
TELEPHONE NO:
FROM: Harold R. Hawkins ~. SUBJECT:
Petroleum Inspector
Witness BOPE Test
Conoco, Inc.,
CFP-1 Milne Point,
Sec. 24, T13N,R10E,UM,
Permit No. 85-8.
T.Uesday~, January 22, 1985: I left Anchorage at 3:30 pm, by Alaska
~i~i-ine~' t~--'PrU~hoe Bay, arriving at 5: 00 pm and arriving at
Conoco's CFP-1 at Milne Point at 7:00 pm.
Wednesday, Janu.ary 23, 1985: 13 3/8" was run, but could not be
landed as t~e ~'hreads inside of casinghead were not the same as on
the 13 3/8 casing. A new head was brought out and cementing was
performed.
Thursday, January. 24, 1985: I witnessed the BOPE test. There were
two failures. I filled out am AOGCC report which is attached.
In summary, I witnessed the BOPE test on Conoco's CFP-1 at Milne
Point. Tests were Performed satisfactorily when completed.
Attachment
02-00IA(Rev. 10/79)
O&G #4
3184 ~
,Inspector
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION COMMISSION
B.O.P.E. Inspection Report
·
Date
Well
Operator ~0/~ &~'O
Well. A- ?P - / z~/h~ P~/,~. 'T
Location: Sec ~ T
Drilling Contractor ~/~.' _~.~. z~
Location, General f)/( Well Sign.__
General Housekeeping ~ Rig
Reserve Pit ~/~
Mud Systems Visual Audio
Trip Tank
Pit.Gauge
· Flow Monitor , ~/~
Gas Detectors
BOPE Stack
Annular Preventer
~ Pipe Rams
~.~ Blind Rams
'~ Choke Line Valves
: H.C.R. Valve
~ Kill Line Valves
~ check Valve
i::Test Results: Failures
Test Pressure
Representative/~/
Permit # ~_~"i'~'
/J~/~/Casing Set @ A / ~'"~/ ft.
Rig #~7~ Representative _~)Z~
!
ACCUMULATOR SYSTEM
Full Charge Pressure ,~.:0 d~' psig
Pressure After Closure ,--" psig ~-~'
Pump incr. clos. pres. 200 psi~ ~- m±n./j'~see.
Full Charge Pressure Attained: / min
Controls: Master ~/~
Remote ~/C Blinds switch cover ~/~
Kelly and Floor Safety Valves
Upper KellM
Lower Kelly
Ball Type
Inside BOP
Choke Manifold
No. Valves /~
No. flanges ~ ~
Adjustable Chokes ~-~
Test Pressure .~
Test Pressure ~
Test Pressure ~-~d2
Test Pressure ~
Test Pressure
Hydrauically operated choke ~-
Test Time ~ hrs. ~) ~ Z ~'~
Repair or Replacement of failed equipment to be made within ~___~days and Inspector/
Commission office notified.
Remarks: ~~,~-l= ~05T ~/=~ ~P~$/~ ~/~c ~ ,~//'~ ~/~ ,/1/~<"~///~ /~2-
Distribution
orig. - A0&GCC
cc - Operator
cc - Supervisor
Inspector '" , ,~--'~ 9 J
January !6, 1985
~, James B. Fox
Engineering Techician
Conoco Inc.
2525 C Street, Suite 100
Anchorage, Alaska 99503
Re: Milne Point Unit No. CFP-1
Conoco Inc.
Permit No. 85-8
Sur' Loc. 303'FSL, 2075'FEL, Sec. 24, T13N, R10E, DM.
Btmho!e Loc. 303'FSL, 3089'FEL, Sec. 24, T13M, R10E, UM.
Dear Mr. Fox:
Enclosed is the approved application for permit to drill the
above referenced well.
If coring is conducted, a brief description of each core and a
one cubic inch size chip from each foot of recovered core is
required. Samples of drill cuttings and a mud log are not
required. A continuous directional survey is required as per
20 AJ_C 25.050(b)(5). If available, a tape containing the
digitized log information shall be submitted on all logs for
copying except experimental logs, velocity surveys and dipmeter
surveys.
Many rivers in Alaska and their drainage systems have been
classified as important for the spawning or migration of
anadromous fish. Operations in these areas are subject to
AS 16.05.870 and the regulations pro~!gated thereunder (Title 5,
Alaska Administrative Code). Prior to commencing operations you
may be contacted by the Habitat Coordinator's Office, Department
of Fish and Game.
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Article 7 and the regulations promulgated thereunder
(Title t8, Alaska Administrative Code, Chapter 70) and by the
Federal Water Pollution Control Act, as amended. Prior to
commencing operations you may be contacted by a representative of
the Department of Environmental Conservation.
Mr. James B. Fox
Mi!ne Point Unit CFP-I
-2-
January 16, 1985
To aid us in scheduling field work, please notify this office 24
hours prior to commencing installation of the blowout prevention
equipment so that a representative of the Commission may be
present to witness testing of the equipment before the surface
casing shoe is drilled. ~ere a diverter system is required,
please also notify this office 24 hours prior to commencing
equipment installation so that the Commission may witness testing
before drilling below the shoe of the conductor pipe.
In the event of suspension or abandonment, please give this
office adequate advance notification so that we may have a
witness present.
Verv truly~Mours,
C. V. Chatterton
Chai~an of
Alaska Oil and Gas Conse~ation Co~ission
BY OP~ER OF %~E COmmISSION
Enclosure
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Mr. Doug L. Lowe~7
ï (corl-lCO)
John R. Kemp Conoco Inc.
Manager of Alaskan Operations 2525 C Street
Suite 100
Anchorage, AK 99503
January 11, 1985
Mr. C. V. Chatterton
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mr. Chatterton:
Conoco is submitting for approval the enclosed permit to drill (in
triplicate) and the required permitting fee for the Milne Point Unit Well
CFP No.1. This well is being drilJ.ed strictly as a water source well to
be used for waterflooding, potable water and fire protection.
While it is our understanding that the Alaska Oil and Gas Conservation
Commission has no jurisdiction over water wells, the proximity of the
lower tertiary water sands to hydrocarbon bearing sands (upper Cretaceous)
makes the submittal of this permit application seem prudent. The proposed
T.D. is within !150 vertical feet of a known oil bearing sand. However,
the actua.l T.D. will most likely be somewhat less and the lowest producing
(water) interval is expected to be !400 vertical feet above the producing
interval.
If you have any questions, please contact Jim Fox at 279-0611.
VlJ:;;~
Rogers J. Francis
Manager-Engineering
RJF/1aj
Attachment
RECEIVED
JAN 1 1 1985
Mask 0"
. a I & Gas Cons. Commission
Anchorage
la. Type of work.
~ ' STATE OF ALASKA .....
ALASKA OIL AND GAS CONSERVATION COM,v, lSSlON
PERMIT TO DRILL
DRILL ~]
REDRILL []
DEEPEN []
20 AAC 25.005
EXPLORATORY El. SERVICE BI
DEVELOPMENT OIL [] SINGLE ZONE
DEVELOPMENT GAS [] MULTIPLE ZONE E]
99503
lb. Type of well
2. Name of operator
Conoco Inc.
3. Address
2525 C Street, Suite 100, Anchorage, AK
4. Location of well at surface
303' FSL, 2075' FEL, Sec. 24, T13N, R10E, U.M.
At top of proposed producing interval
303' FSL, 2875' FEL, Sec. 24, T13N, R10E, U.M.
At total .depth
303' FSL, 3089' FEL, Sec. 24, T13N, R10E, U.M.
5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no.
RKB 52' Pad 17' ADL
12. Bond information (see 20 AAC 25.025)
Type Blanket Surety and/or number 8086-15-54
9. Unit or lease name
Milne Point Unit%
10. Well number
CFP-1
11. Field and pool
Kuparuk River
Ter~tiary Water Sand
Amount $200,000.00
13. Distance and direction from nearest town I 14. Distance to nearest property or lease line
33 mi. NW of Deadhors~iles J 7980' @ surf feet
16. Proposed depth (MD & TVD) 17. Number of acres in lease
4090l MD(3900l TVD) feet 2560
19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures
o
KICK OFF POINT 835 feet-. MAXIMUM HOLE ANGLE ?.9 c~ (see 20AAC25.035 (c) (2)
21
15. Distance to nearest drilling or completed
FP-2wel~ 120'N-NE/Surface feet
18. Approximate spud date
1-31-85
1415 psig@__~ Surface
psig@ __,,,,~t. TD (TVD)
17/:6
qU~'J-
Proposed Casing, Liner and Cementing Program
SIZE
!Hole Casing Weight
i 26" 120" 94
~ IZ~" I t~ _5/8" 30
22. Describe proposed program:
CASING AND LINER
Grade Coupling
H-40 [ PELP
K-55
Length
80'
2137'
4055'
MD
35'
35'
35'
SETTING DEPTH
TOP TVD
135'
135'
1~35~
I
MD BOTTOM TVD
115'1115'
2172'12100'
4090' 13900'
QUANTITY OF CEMENT
(include stage data)
± 100 cf
3250 sks Arctic Set II
530 sks Arctic Set II
600 sks Class G
100 BBL Arctic Pack
Conoco Inc. proposes drilling the subject we]_l as a water source well in the tertiary water sands. The well is
not intended to penetrate any hydrocarbon bearing formations. However, the T.D. wi]] be within +150 vertical
feet of the Upper Cretaceous oil sands. Due to these sands close proximity to hydrocarbon bearing formation,
this application is being submitted. The ~nd. system is to be non-dispersed low solids with a mininmm mud
weight of 9.2 ppg. and a maximum of 9.8 ppg. A 20" 2000 psi diverter will be inst~]ed on the 20" conductor for
dr411~ng the surface hole and then installed on the 13 3/8" surface casing for drilling the production hole.
The surface casing and shoe w~]] be pressure tested to a 12.9 ppg F~CE. ~ anticipated surface pressure is
based on a fluid column at T.D. of 80% gas and 20% oil. Casing will be tested to 1500 psig. CFP-1 is 120' from
the CFP-2 we]lbore on the surface and w~l 1 not be any closer downhole. Arctic pack wi].], be placed in the 13
3/8" x 9 5/8" annulus after disposing of excess drilling fluids. The well w~] 1 be completed with grave], packs
across the productive water sands.
23. I hereby,~certify that the foregoing is true and correct to the best of my knowledge
SiGNEDt~/F/~ *~ -~.~j~ TITLE Engineering Technician
The space~'elow for Commms~on use
CONDITIONS OF APPROVAL
Samples required I Mud log required
Permit number I Approval date
Form 10-401
DATE ]-10-85
Directional Survey required I APl number
I~YES []NO I 50- o Z.~ - $/% 7/
SEE COVER LETTER FOR OTHER REQUIREMENTS
,COMMISSIONER DATE January 16, 1985
by order of the Commission
Submit in triplicate
It
CEMENTING PROGRAM
A.
B~
C~
SUPPLEMENTAL DATA SHEET
APPLICATION FOR PERMIT TO DRILL
Conoco et al - Milne Point No. CFP-1
Conoco Inc.
2525 "C" Street, Suite 100
Anchorage, Alaska 99503
The 20" conductor will be set at 80' below the surface (115'
K.B.), then cemented to the surface with permafrost cement.
The 13 3/8" surface casing will be cemented with 3250 sacks of
Arctic Set II cement. The top job will be done ~f cement is not
circulated to the surface.
The 9 5/8" production casing will be cemented in two stages. The
first stage will be pumped around the shoe and will consist of
600 sacks of Class "G" cement followed by 340 sks of Arctic Set
II cement (calculated using 100% excess). The second stage, to
be squeezed down the 9 5/8" x 13 3/8" annulus, will consist of
190 sacks of Arctic Set II cement followed by 110 bbls of Arctic
pack.
II. ANTICIPATED GEOLOGY
0' - TD
Surface conglomerates, coal, clay, silt and sand
sequences. Estimated base of permafrost at 1800'±.
III. FORMATION EVALUATION
Wireline logs for the 12¼" hole from T.D. to the 13 3/8" shoe will
include: Dual Induction; Sypherically Focused Log; Formation
Compensated Density with Compensated Neurton Log and GR-caliper.
IV. DRILLING FLUIDS
A high viscosity gel-fresh water (non-dispersed)
mud system
0' - 1000'
Low solids non-dispersed gel/water mud system
1000' - T.D.
V. DIRECTIONAL PROGRAM
This well has a proposed KOP of 835', then builds angle to 29.5° in a
due west direction. The closest that the CFP-1 well will come to
another wellbore is 120'. This will occur with the existing CFP-2
wellbore from surface to the proposed KOP at 835'. A M.W.D. tool will
be used while drilling for directional control. Final ho].e angle will
RECEIVED
JAN l, i ]985
Alaska Oil & Bas Cons. Commission
C~
BUILD RATE -
DR i-'~F, R AT'E =.'
'-' 50 D EG / 1 ,n,O '"
1.5 (") DE G / 1 ('~ (]. '"
I< I C:K 0 F F D E P ]" I-..I A T
ANGLE ESTABLISHED A'l"
'....-..;]"Ar:(]" ANC:iL.E .r.)F;.:CIP AT
STO!:' AI',IGLE DRr')F' AT
C! B,_,l E: C 7' 'J. ',,; E"' A-I'
E: A'.=; F 3 S 0 L I_1T I 0 N
-' ' .. _ 22'P
BLIII_D F~Af II t::; = 1.8:=:'"
D RO F' R A D I U S = 31El 1 9.7 2 /
'TVr'~
DE:V ANGLE
MD
:=:35. O0
2012. :35
2298. ?F.~4
:"::262.0:3
:3'T"62.03
A D D I T I ri N A L_ F' 01 F..I'T A T
(.]£fr-~ I'T' I Ot',JAL. F'O I N'T AT
,,':-I r) D I T ICI I'fiA L F:' 01 N T A'T
2100. O0 :3'74. 15 '2.,:'P. 45
:2:100. O0 :=-:00. O0 15.00
:=-vF'C)C). OC) 10 J. 4. :36 J. 5,
217.1. 6'.:.)
326:2,0:3
4.0 F..' 0 ,, 2 5
Eastman
Whipstock
800 j:::_:_:(~ TARGEt ): ':::-'
......... ~ ~=-ILL-_:.: ..........
- ·
Alaska:
· I
~n'lmJs$io~ , -
! .
:_SURF'aCl ' t , · ,' ~-
CONOCO INC.
MILNE POINT UNIT
20" DIVERTER STACK
,. ,
6" Relief Line
Fill-up Line ~
000
~nular
~Preventer
Valve
~ ] Drilling ) Spool
120" x 20"
~ 2000 psi
Saver Sub
Assembly
Flow Line
(~ 6" R~lief Valve
Diverter Quick
Connect Assembly
1. Relief lines.from the drilling spool will be routed for downwind
diversion.
2. Hydraulic control system will be in accordance with API specifications
and AOGCC regulations.
3. Both HCR valves will open when the preventer closes, then either one
may be closed.
* Depending on rig contracted, the two 6" lines may be replaced by a
single 10" line with a downstream tee.
DRG 7-17-84
ALASKA UNITED DRILLING
RIG NO. 3
RECEIVED
JAN 1 ! 1985
Alaska Oil & Gas
CHOKE MANIFOLD'
LIQUID MUD SYSTEM
Active pits
Solids removal function
4 each: 6"x 6"centrifugal pumps, 75 hp
Reserve pits
16 each: Lightnin' mixers, 5 hp
CAPACITIES
. ~CI'IV£ SYSTEM I Sand
I Degasser tank
I Ocsander suction
I Deslller Suction
SUBTO [AL
Mud Tan~ No. I Common
2 Suction
Mud Tank ~o, 2
R~c~iving
Di~(harge
Mud ~ank No, 3
5U~rOTAL
ACTIVE SY~[EM IOT~
IRIP
6 bbl
56 bbl
5~1 bbl
SS bbl
66 bbl
237 bbl
~16 I)bl
12Z
184
184 bbl
~40 bbl
168 bbl
IOOS bbl
150 bbl
SURFACE VOLUME GRAND TOTAL
(Calculated 4' below tank topi
Working Pressure 10,000 psi w/ (2) HCR valves
Choke (1) Type (2) Manual
Choke (2) Type (1) Automatic
ALASKA UNITED DRILLING
RIG NO. 3
Flow path .L._;__~_____.~_
Solids removal
DEGA$SING FLOW PATH
Flowline lin) 8, pass shaker screens
Shaker discharge into sand trap (ditch to pit room closedJ
Sand trap overflow into degasser suction (desander suction closed)
Degasser discharge into ditch
Overflow returns to degasser suction (under flow butterfly closed)
Switch desander suction out of degasser t~nk
Desilter s(.~ior'~ (NormalJ
Cleaned mud to treatment pit
Under flow from treatment to suction pit
Gravity-flooded suction
LDCATION IN SECTION
FROM ~,LINE' FROM E. UNE
zLi4'
~_ I 'TO '
~F SURVEYOR
',
STATE
PLANE CO-ORDS.
NORTHINGS
G, oJ $, '~9. 9(0
FT. UNIT BOUNDN:~Y
MILNE ............... ..,I ................
"~' ' '" .....
SCALE ~ ~ CONOCO
MILNE POINT UNIT
EXISTING DEVELOPMENT
NOTF$:
I. STATE PLANE CO.ORDINATES ARE ZONE 4.
I HEREBY CERTIFY THAT I AM PROPERLY
REGISTERED AND LICENSED TO PRACTICE
LAND SURVEYING IN THE STATE OF ALASKA
AND THAT THIS PLAT REPRESENTS A
SURVEY MADE BY ME OR UNDER
MY SUPERVISION. AND THAT AU. DIMENSIONS
AN'D OTHER DETAIL~ ARE: CORRECT.
EASTINGS
ALL GEODETIC POSITIONS AR/ BASED ON
N.A.D. 19Z7. .
OFFSETS TO SECTION LINES ARE COMPUTED
BASED ON PROTRACTED VALUES OF THE
SECTION CORNER POSITIONS.
r,.- lc:>- F__ "r- 15- ~ ~Fc-i", 24.
GEODETIC POSITION
DATE
LATITUDE
7o:z7/ %5.512"
gGg, oSZ.ol
569. ooS'.Go 70:27Ls§.Go5''
LONGITUDE
149'. ?.G'- lO. 894"
149'-Z(o; IZ.ZZ7" Ii- 4 - ~4
RECEIVED
.~A N :[ ..~. ~985, - .
o~, ~ ~:-~o.~.' co~~ ~ 8SS~,
Anchorage :ENGINEERS
AND ~RVEYO~
CHECKED
·
5.~.
C.F. PAD
AS-BUILT WELL LOCATION
FIELD BOOK
, .
SUrveyed for
.CO NOC.O
SCALE : - J SHEET
I4" · 500' J I OF I
COMMENTS I .
CHECK LIST FOR NEW WELL PERMITS Company ~ Lease & Well No . 111t..( C rf -' I
ITEM APPROVE DATE YES NO REMARKS
(1) Fee tf"'--- I-lf~,!,F 1. Is the peimií: fee attached........................................ ~!..b--
(2) Loc ~P\-. /-¡Ý8Ý 2. Is well to be located in a defined pool.. .................... ., ........
thru 8) 3. Is well located proper distance from property line ..................
4. Is wèll located proper distance from other wells ....................
5. Is sufficient undedicated acreage available in'this pool............ =
6. Is well to be deviated and is wel1bore plat included ................ -
7. Is operator the only affected party................................. -
!lull 1/1.r;1$~ 8. Can permit be approved before ten-day wait.......................... -
(8), f
(3) Admin 77~.-- )-1 f'""r 9. Does operator have a bond in force.................................. d:::J:-
(~"12) 10. Is a conservation order needed...................................... - ~. (" '.,,<
IIJJf II/.>/ss- 11. Is administrative approval needed................................... ~ ,
(10 and 1.'2)1 12. Is the lease number appropriate ..................................... 7lJ!L ~ IJ(JL ¿.¡7t.1J7 0 ~~/JÁY.
(4) Casg ,HÚJ, 11 ¡/'$j,rltr 13. Is condUc, tor string provided ,.................. .,. ,. ., ... .,...."...."... 'J"II - t:;
(13 thru 21 " 14. Is enough cement used to circulate on conductor and surface.. ....... 0
- 1-3
15. Will cement tie in surface and intermediate or production strings ... = z
- ", ~o
16. Will cement cover all known, productive horizons-... ..... .. . . . ... . .. .. ilJi - Nt; #'Dl?bfJ.IJRBtJN:t.I>'HES t'ð- 1£ PeJORATEO en 1-3
17. Will surface cas,illgprotect fresh wat.r;()~!$. .............. .........- ~"~
r 18~ Will all casing give adequate safety in collapse,. tension and burst.. , ~ ~
19. Is this well to be kicked off from an existing wellbore ............. - if1l tz: tz:
20. Is oldwellbore ,abandomnent procedure., included on 10--403 ............ --- -- (V, I! , ~
21. Is adequate wellbore separation proposed............................ IIi!1í - S~l! B£LÞu)
(5) B"'",O",, p~",.."".,It,. r¡jj,"",tJ,.'.'. "", , fi~ 22. I~ adivert,:~sy~t<lllfreqUired .. .... ... ........ ~. ..............~. ~ .,.'.~. ...: .,.,M,'"..,'íP,',lI,""" -
(1!;,tft'!'U! ;23~ Arenecess'ary diagr'ams of dive rt-e r and BOP equipment a'ttached~;.~. ;~t¡¡tJJ.. -
24. Does.BOPE~av~suffi~iel1t<pJ."essurerating-T~~t to. .' -- .' ' ,psig .. ~ -/?()P£.li)<LL l>/oT8£VSJ::O
25. Does tbe chokeman:f.foldcomplywlAPI RP-53 (Feb. 78).................. - --AI6r..suBMI1TED 'C,.,,'..',."'~"'!f-
26. It1 tlje prese]1ce o~ HZS gasp:robable .. ... ... ..,....... ......... ...... ... - JJilJI. "
(6 ) Add:./f!1lL. j¡fS;~ 27 . Adð.1.1;i0t\8'! requ:!..re1!¡en 1;$ . ~. . .. . . .. . . .. . .. . ... . . . . .. .. .. .. .. . . . .... ... -='- Iii!Ji
AdditionalRémarks:i1IGlLCFP-IWIJ.L 11£, J,2L/'FI<.ÞMt!..¡::p-.i ¡::RÔMSUIeFiJ.~E To ~]S~Îljn.. ,rJlE1:E ôJli12¡Z
Nt; t>TH£R t (!.J./)SE WELL8l>R£5 ~IV'/ IJJHrJ?¡ Ð/)!.J)¡.J)}t;)f.
LEIiSE }.It), all-AAfGED TÞ!lDLLJ? 4'"3 7 p£1(. J; FOX
.
INITIAL GEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO. SHORE
--- Se.v-c.J I w1(l ~~ 0 II jÿ¡ Q N
" "
f
Well Histo.ry File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIX.
.,
No special 'effort has been made to chronologically
organize this category of information.
L Z S T A P ,:2
Vi~.R £F ICATION LZ ST,~.N~
. O J i
: lJ2~
RZC']RDS :',: :~
137
ON:T
TYPE
OOO
OOO
030
OOO
OOO
OJO
000
~AT E
OOC
OOO
COO
0.2O
O 13
0 O 6
01 Z
O03
'YP~E FuU.ZD = G~
~H = iO.O RMC = 1.390
VP GI~.H?,Z V2~£,~:'£C~.TION LiSTiNG DA3E -3
:, DAT,~ FORMAT R!'lc..lRS,. .- .......
'NTRY
TYPE SIZE R E P'F, CJDE
£ i r6 5
4 .i -S 5
8 ~ 7,3
9 4 6~ .lin
,L6 1 6 6
~ATUM SPECZFIC.~TZON 'JLOC<~
iNEM SERVICE SERV~:SE~ UN.iT ,~Pl ~iPi APl APl ~:i,~-f. SiZ~ SPL REPR
ir~ CRC~'R m LSG 'T'¥PF C~.A:SS ','00 N~
)EPT ~FT O0 GO0 03 0 O ~
;F~u Ol~ OHMM O0 gZO Oi 0 3 ~
' L D .5 ,I ,~ 0 H M M 0 O' ~ Z 0 ~ 6 0 O ¢
' L M D i ~ O H M M 0 O i ''~"
;P Oi;~ MV OO DIG O1 0 O ~
;R gnu ,=APi O0 31~ Oi 0 0 4
"A~i LN,L IN O0 .260 iPl 0 0 ~
~M~ CNL S/C.3 00 350 02 O 3 ~
)RHC CNL ,S/CS OC 356 :31 0 0 ~
'EF CN: O0 35~ 31 0 O ~
PR 6C ES S
I 68, OOOOOO00000000
I 58 O000000000000O
i ~,S OOO,OOO00C, OOOO0
£ .35 O00OO000OOOOOD
! .5'b O'O00OOOO000000
1 66 OOO0000000000O
:i :~B OOOOOOOOOO0000
i 66 OOOOOOO0000OO0
1 :S8 0000000,300000:2
1 68 O00OO000000OOO
)EPT 3.310. 0030 SFLU 6. 2930 :LO
~P -47. 3000 3R 6,2..21,37 SR
,IH L,g .I. ,:506 JRd3 0.1035 P.5~
3~-PT 3aOO.'OO30 'S F ~.U ,3. 2773 ELD-
6.2.21-57 CA.1
i. 3 '9-~ 5
6. 6758
1,:.
.V~ J,.lJ.hO~ 'VEriFiCATION ,~ZST,iNG P~i, ~.
} .E :P T
~P
~ ~ P T
),i PT
~P
~P
~E? T
~P
}EPT
3EPT
3~PT
D~PT
SP
SP
JE:PT
SP
6~..21~?
3300.00n ~'
· ~ O S F L U
~. i 2 .B 9
58.15o2
O. 0~93
3~00. O00O SF'LU
6. 7070
0.0396
$~O0.O00O .SFLU
2.0977 g R H G
0..4 '766
6. ~. 3 '75
0.0215
-37.5000 SR
5 '9. T i B 8
0. gl 90
-4.'3,0000
.g,0t?6
5.6672
0.0112
-~6.gO00
2,1152 ORHO
5625
d I ,Z 5
01.17
2~00.0000 SFLU
1.2979 DR~O
7.2187
Z7,8i25
2300.0000 SFLU
- 5 g. O 0 'O 0 ,'~; R
4,5. ,68 75
0.032Z
2700.0000 SFLU
2.!93'4 OReO
-O.O0~q
2.500.0000 SFLU
-57.5000 SR
Z. O13 7 ~R,HG
3~.$563
25C0. 3000 SFLU
-70.5030 ~3R
1i.7891
0.0C49
,Z~OO.OOOO SFuU
Z,0i95 DRdC
'~. 335'9
4 ~. ~ 437
O. 0493
-75.2500
..O~ 3R~''~
9.65,53
-0.0015
p ,k- 'F
'3 R.
I L D
'3 R
,i L :3
,
Z L u
'3 R
PE F
IL 0
ILD
PEF
i c :D
P :'E F
' LO
PE:
ILg
,3 R
PEP
:PE =
p: ,=
iL.)
5.3.8i8
5 a i 55
!. ,21 ','.t '5
9 '0.6.8 '75
· ~,. ~*I,50
1 ,Z. 0 781
'718 '5
747'1
1!..~219
,1,61.52
~.,?~ZZ
1.9570
Z7.8125
,i.0254
i$.~672
Z.2012
13.3750
3~.65,$3
i.5.3,~?
i~.O000
2. Z3,24
1Z. 5938
,+J. 5437
i.7603
CALi
I 'U M
· £ A L i
CA~.I
I L M
ZLM
CA~Z
CA~i
,[ LM
ILM
iLM
CALl
ZLN
iLM
C4LZ
.IL M
12.2031
12.5000
11.51.5.6
I.i,..Z5'76
13.53,13
6.3857
£3.156,Z
1 3. ~453
i ,i. = 4 J ~
12.51.~6
i3.53~i
13.3751
13.15~2
3.7576
13.
;EPT 2 LO O. 0000 S'FLL;
; P - 7 I . O 0 ,'30 '3 R
,. O0 i
132,~
9 .. 7 6 i .3
5 Z. ,~, 4 ,] 8
"~. 3 0 0 S
3.4.
- 0. ,~ '9 i 7
S R
ZLD
-R
I 1 . ~ 2 i 9 i L N
10.52~%
,ZOO0. 9000
! ,Z..3 6 '? 2