Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout223-027DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 0 2 9 - 2 2 6 7 9 - 0 1 - 0 0 We l l N a m e / N o . M I L N E P T U N I T F - 1 0 A Co m p l e t i o n S t a t u s 1- O I L Co m p l e t i o n D a t e 11 / 1 4 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 2 7 0 Op e r a t o r H i l c o r p A l a s k a , L L C MD 18 2 6 5 TV D 72 5 2 Cu r r e n t S t a t u s 1- O I L 1/ 5 / 2 0 2 6 UI C No We l l L o g I n f o r m a t i o n : Di g i t a l Me d / F r m t Re c e i v e d St a r t S t o p OH / CH Co m m e n t s Lo g Me d i a Ru n No El e c t r Da t a s e t Nu m b e r Na m e In t e r v a l Li s t o f L o g s O b t a i n e d : PB 1 : M W D / G R / R E S A : M W D / G R / R E S No No Ye s Mu d L o g S a m p l e s D i r e c t i o n a l S u r v e y RE Q U I R E D I N F O R M A T I O N (f r o m M a s t e r W e l l D a t a / L o g s ) DA T A I N F O R M A T I O N Lo g / Da t a Ty p e Lo g Sc a l e DF 12 / 5 / 2 0 2 3 16 3 8 5 1 8 2 6 5 E l e c t r o n i c D a t a S e t , F i l e n a m e : M P U F - 10 A _ L W D _ F i n a l . L A S 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : M P U F - 1 0 A P W D Ru n 0 8 . l a s 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : M P U F - 1 0 A P W D Ru n 0 9 . l a s 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : M P U F - 1 0 A P W D Ru n 1 0 . l a s 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : M P U F - 1 0 A P W D Ru n 1 1 . l a s 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A 2 M D F i n a l L o g . c g m 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A 2 T V D S S F i n a l Lo g . c g m 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A 5 M D F i n a l L o g . c g m 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A 5 T V D S S F i n a l Lo g . c g m 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P W D _ R u n _ 0 8 . c g m 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P W D _ R u n _ 0 9 . c g m 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A 2 M D F i n a l L o g . P D F 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A 2 T V D S S F i n a l Lo g . P D F 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A 5 M D F i n a l L o g . P D F 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A 5 T V D S S F i n a l Lo g . P D F 38 1 9 7 ED Di g i t a l D a t a Mo n d a y , J a n u a r y 5 , 2 0 2 6 AO G C C Pa g e 1 o f 5 PB 1 MP U F - , 10 A _ L W D _ F i n a l . L A S DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 0 2 9 - 2 2 6 7 9 - 0 1 - 0 0 We l l N a m e / N o . M I L N E P T U N I T F - 1 0 A Co m p l e t i o n S t a t u s 1- O I L Co m p l e t i o n D a t e 11 / 1 4 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 2 7 0 Op e r a t o r H i l c o r p A l a s k a , L L C MD 18 2 6 5 TV D 72 5 2 Cu r r e n t S t a t u s 1- O I L 1/ 5 / 2 0 2 6 UI C No DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P W D _ R u n _ 0 8 . P D F 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P W D _ R u n _ 0 9 . P D F 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A 2 M D F i n a l L o g . t i f 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A 2 T V D S S F i n a l L o g . t i f 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A 5 M D F i n a l L o g . t i f 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A 5 T V D S S F i n a l L o g . t i f 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P W D _ R u n _ 0 8 . t i f 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P W D _ R u n _ 0 9 . t i f 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U _ F - 1 0 A D e f i n i t i v e Su r v e y s . p d f 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U _ F - 1 0 A D e f i n i t i v e Su r v e y s . x l s x 38 1 9 7 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 16 3 8 5 1 7 9 4 4 E l e c t r o n i c D a t a S e t , F i l e n a m e : M P U F - 10 A P B 1 . l a s 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : M P U F - 1 0 A P B 1 PW D R u n 0 1 . l a s 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : M P U F - 1 0 A P B 1 PW D R u n 0 2 . l a s 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : M P U F - 1 0 A P B 1 PW D R u n 0 3 . l a s 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : M P U F - 10 A P B 1 P W D R u n 0 4 . l a s 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : M P U F - 10 A P B 1 P W D R u n 0 5 . l a s 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : M P U F - 10 A P B 1 P W D R u n 0 6 . l a s 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 ### # # # # #### # # # # # El e c t r o n i c D a t a S e t , F i l e n a m e : M P U F - 10 A P B 1 P W D R u n 0 7 . l a s 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 2 M D F i n a l Lo g . c g m 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 2 T V D S S F i n a l Lo g . c g m 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 5 M D F i n a l Lo g . c g m 38 1 9 8 ED Di g i t a l D a t a Mo n d a y , J a n u a r y 5 , 2 0 2 6 AO G C C Pa g e 2 o f 5 MP U F - 10AP B 1 . l a s DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 0 2 9 - 2 2 6 7 9 - 0 1 - 0 0 We l l N a m e / N o . M I L N E P T U N I T F - 1 0 A Co m p l e t i o n S t a t u s 1- O I L Co m p l e t i o n D a t e 11 / 1 4 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 2 7 0 Op e r a t o r H i l c o r p A l a s k a , L L C MD 18 2 6 5 TV D 72 5 2 Cu r r e n t S t a t u s 1- O I L 1/ 5 / 2 0 2 6 UI C No DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 5 T V D S S F i n a l Lo g . c g m 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 1 . c g m 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 2 . c g m 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 3 . c g m 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 4 . c g m 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 5 . c g m 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 6 . c g m 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 7 . c g m 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 2 M D F i n a l Lo g . P D F 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 2 T V D S S F i n a l Lo g . P D F 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 5 M D F i n a l Lo g . P D F 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 5 T V D S S F i n a l Lo g . P D F 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 1 . P D F 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 2 . P D F 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 3 . . P D F 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 4 . P D F 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 5 . P D F 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 6 . P D F 38 1 9 8 ED Di g i t a l D a t a Mo n d a y , J a n u a r y 5 , 2 0 2 6 AO G C C Pa g e 3 o f 5 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 0 2 9 - 2 2 6 7 9 - 0 1 - 0 0 We l l N a m e / N o . M I L N E P T U N I T F - 1 0 A Co m p l e t i o n S t a t u s 1- O I L Co m p l e t i o n D a t e 11 / 1 4 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 2 7 0 Op e r a t o r H i l c o r p A l a s k a , L L C MD 18 2 6 5 TV D 72 5 2 Cu r r e n t S t a t u s 1- O I L 1/ 5 / 2 0 2 6 UI C No DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 PW D _ R u n _ 0 7 . P D F 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 2 M D F i n a l L o g . t i f 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 2 T V D S S F i n a l Lo g . t i f 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 5 M D F i n a l L o g . t i f 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 5 T V D S S F i n a l Lo g . t i f 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 P W D _ R u n _ 0 1 . t i f 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 P W D _ R u n _ 0 2 . t i f 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 P W D _ R u n _ 0 3 . t i f 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 P W D _ R u n _ 0 4 . t i f 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 P W D _ R u n _ 0 5 . t i f 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 P W D _ R u n _ 0 6 . t i f 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U F - 1 0 A P B 1 P W D _ R u n _ 0 7 . t i f 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U _ F - 1 0 A P B 1 D e f i n i t i v e Su r v e y s . p d f 38 1 9 8 ED Di g i t a l D a t a DF 12 / 5 / 2 0 2 3 E l e c t r o n i c F i l e : M P U _ F - 1 0 A P B 1 D e f i n i t i v e Su r v e y s . x l s x 38 1 9 8 ED Di g i t a l D a t a DF 12 / 2 2 / 2 0 2 3 16 4 9 0 1 6 3 2 3 E l e c t r o n i c D a t a S e t , F i l e n a m e : M P U _ F - 10 A _ P L U G _ 0 7 D E C 2 3 _ C o r r e l a t i o n . l a s 38 2 3 9 ED Di g i t a l D a t a DF 12 / 2 2 / 2 0 2 3 16 4 8 7 1 6 3 2 2 E l e c t r o n i c D a t a S e t , F i l e n a m e : M P U _ F - 10 A _ P L U G _ 0 7 D E C 2 3 _ S e t t i n g . l a s 38 2 3 9 ED Di g i t a l D a t a DF 12 / 2 2 / 2 0 2 3 16 5 2 3 1 6 3 4 2 E l e c t r o n i c D a t a S e t , F i l e n a m e : M P U _ F - 10 A _ T U B I N G - P U N C H _ 0 7 D E C 2 3 _ C o r r e l a t i o n . l a s 38 2 3 9 ED Di g i t a l D a t a DF 12 / 2 2 / 2 0 2 3 16 5 1 0 1 6 3 2 8 E l e c t r o n i c D a t a S e t , F i l e n a m e : M P U _ F - 10 A _ T U B I N G - P U N C H _ 0 7 D E C 2 3 _ S h o o t i n g . l a s 38 2 3 9 ED Di g i t a l D a t a DF 12 / 2 2 / 2 0 2 3 E l e c t r o n i c F i l e : M P U _ F - 10 A _ P L U G _ 0 7 D E C 2 3 . p d f 38 2 3 9 ED Di g i t a l D a t a DF 12 / 2 2 / 2 0 2 3 E l e c t r o n i c F i l e : M P U _ F - 10 A _ P L U G _ 0 7 D E C 2 3 _ i m g . t i f f 38 2 3 9 ED Di g i t a l D a t a DF 12 / 2 2 / 2 0 2 3 E l e c t r o n i c F i l e : M P U _ F - 1 0 A _ T U B I N G - PU N C H _ 0 7 D E C 2 3 . p d f 38 2 3 9 ED Di g i t a l D a t a Mo n d a y , J a n u a r y 5 , 2 0 2 6 AO G C C Pa g e 4 o f 5 DA T A S U B M I T T A L C O M P L I A N C E R E P O R T AP I N o . 5 0 - 0 2 9 - 2 2 6 7 9 - 0 1 - 0 0 We l l N a m e / N o . M I L N E P T U N I T F - 1 0 A Co m p l e t i o n S t a t u s 1- O I L Co m p l e t i o n D a t e 11 / 1 4 / 2 0 2 3 Pe r m i t t o D r i l l 22 3 0 2 7 0 Op e r a t o r H i l c o r p A l a s k a , L L C MD 18 2 6 5 TV D 72 5 2 Cu r r e n t S t a t u s 1- O I L 1/ 5 / 2 0 2 6 UI C No We l l C o r e s / S a m p l e s I n f o r m a t i o n : Re c e i v e d St a r t S t o p C o m m e n t s To t a l Bo x e s Sa m p l e Se t Nu m b e r Na m e In t e r v a l IN F O R M A T I O N R E C E I V E D Co m p l e t i o n R e p o r t Pr o d u c t i o n T e s t I n f o r m a t i o n Ge o l o g i c M a r k e r s / T o p s Y Y / N A Y Co m m e n t s : Co m p l i a n c e R e v i e w e d B y : Da t e : Mu d L o g s , I m a g e F i l e s , D i g i t a l D a t a Co m p o s i t e L o g s , I m a g e , D a t a F i l e s Cu t t i n g s S a m p l e s Y / N A Y Y / N A Di r e c t i o n a l / I n c l i n a t i o n D a t a Me c h a n i c a l I n t e g r i t y T e s t I n f o r m a t i o n Da i l y O p e r a t i o n s S u m m a r y Y Y / N A Y Co r e C h i p s Co r e P h o t o g r a p h s La b o r a t o r y A n a l y s e s Y / N A Y / N A Y / N A CO M P L I A N C E H I S T O R Y Da t e C o m m e n t s De s c r i p t i o n Co m p l e t i o n D a t e : 11 / 1 4 / 2 0 2 3 Re l e a s e D a t e : 6/ 6 / 2 0 2 3 DF 12 / 2 2 / 2 0 2 3 E l e c t r o n i c F i l e : M P U _ F - 1 0 A _ T U B I N G - PU N C H _ 0 7 D E C 2 3 _ i m g . t i f f 38 2 3 9 ED Di g i t a l D a t a Mo n d a y , J a n u a r y 5 , 2 0 2 6 AO G C C Pa g e 5 o f 5 1/ 5 / 2 0 2 6 M. G u h l MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, September 22, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Adam Earl P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC F-10A MILNE PT UNIT F-10A Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 09/22/2025 F-10A 50-029-22679-01-00 223-027-0 W SPT 7073 2230270 3000 1480 1480 1464 1479 2 2 2 2 INITAL P Adam Earl 8/3/2025 MIT-IA tested as per Sundry #324-075. Converted to Injector to 3000psi 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:MILNE PT UNIT F-10A Inspection Date: Tubing OA Packer Depth 738 3270 3219 3210IA 45 Min 60 Min Rel Insp Num: Insp Num:mitAGE250804071311 BBL Pumped:5 BBL Returned:5 Monday, September 22, 2025 Page 1 of 1             1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Temp Jet Pump Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: ESP Completion Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 18,265 feet NA feet true vertical 7,252 feet NA feet Effective Depth measured 18,248 feet 16,477 feet true vertical 7,255 feet 7,073 feet Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing (size, grade, measured and true vertical depth)3-1/2" 9.2# / L-80 16,547' 7,122' 16,477 MD Packers and SSSV (type, measured and true vertical depth)Baker S-3 Packer NA 7,073 TVD NA 12. Stimulation or cement squeeze summary: NA Intervals treated (measured): Treatment descriptions including volumes used and final pressure: NA 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: Same 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title: Wells Manager Contact Phone: Burst Collapse 520psi112'Conductor Surface 20" 9-5/8" 80' 8,635' 2-3/8" 16,704' 18,265' 7,252' 8,604' 4,484' Length Production Liner 16,675' 1,785' Casing ADL0025509, ADL0355018 & ADL0388235 MILNE POINT / KUPARUK RIVER OIL MILNE PT UNIT F-10A Plugs Junk measured measured TVD 7,700psi 7" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 223-027 50-029-22679-01-00 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 3. Address: Hilcorp Alaska LLC N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: 0 0 20 320 112' 0 650 7,233' 5,410psi 1,530psi 5,750psi 7,240psi 3,090psi ryan.lewis@hilcorp.com 303-906-5178 measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 0 Gas-Mcf MD 20 Size 323-491, 323-611& 323-685 Sr Pet Eng: 8,100psi Sr Pet Geo: Sr Res Eng: WINJ WAG 0 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. NA Ryan Lewis PL G Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Samantha Coldiron at 1:37 pm, Mar 08, 2024 Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2024.03.08 13:16:22 - 09'00' Taylor Wellman (2143) DSR-3/11/24 RBDMS JSB 031424 WCB 2-13-2025 _____________________________________________________________________________________ Revised By: DH 2/5/2024 SCHEMATIC Milne Point Unit Well: MP F-10A Last Completed: 12/8/2023 PTD: 223-027 JEWELRY DETAIL No Depth Item 1 16,477’ Baker S-3 Packer 2 16,480’ 2-3/8” x 3-1/2” LTP 3 16,535’ 3-1/2” HES XN Nipple (2.75” ID) 4 16,547’ 3-1/2” WLEG WELL INCLINATION DETAIL KOP @ 6,000’ Max Angle is 75 deg. @ 7,500’ TREE & WELLHEAD Tree 3-1/8” 5M FMC Wellhead 11” 5M FMC Gen5A w/ FMC Tbg. Hng. 4.5” ACME Top, 3.5” EUE Btm. CIW H BPV Hanger Landing Threads 4.5” Left Hand ACME GENERAL WELL INFO API: 50-029-22679-01-00 Initial Completion by Polar 1 - 7/3/1996 Sidetracked and Completed by CDR2 – 12/8/2023 20” Orig KB Elev.: 40.75’ / Orig GL Elev.: 12.5’ 7” 1 4 9-5/8” TubingPunch: 16,415’ to 16,420’ ELM on 12/7/2023 3 Top of Liner Lap 16,485’ MD Whipstock set @ 16,700’ Top of Window @ 16,704’ TD =18,265’(MD) / TD=7,252’(TVD) PBTD =18,239’ (MD) /PBTD=7,257’(TVD) Tubing Patch: 16,407’ to 16,423’ ELM on 12/18/2023 Kuparuk A1 2 OPEN HOLE / CEMENT DETAIL 24” 250 sx Arctic Set (Approx.) 12-1/4” 1590 sx PF E, 1026 sx Class G 8-1/2” 220 sx Class G CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 19.124 Surface 112’ 0.3553 9-5/8" Surface 40 / L-80 / Buttress 8.835” Surface 8,635’ 0.0758 7” Production 26 / L-80 / BTC 6.276” Surface 16,704’ 0.0383 2-3/8” Liner 4.7 / L-80 / Hyd 511 1.995” 16,480’ 18,265’ 0.0039 TUBING DETAIL 3-1/2” Tubing 9.2 / L-80 / NSTC 2.992” Surface 16,547’ 0.0087 PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup. A1 Sands 17,569’ 18,239’ 7,266’ 7,257’ 670 11/12/2023 Open Perforation Data for 11/12/2023: 1.56” Dia. Guns @ 6spf. Well Name Rig API Number Well Permit Number Start Date End Date MP F-10A Well Supp./ SL 50-029-22679-01-00 223-027 11/23/2023 1/28/2024 11/24/2023 - Friday No operations to report. 11/22/2023 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary No operations to report. 11/23/2023 - Thursday Well Support Techs set foundation, installed test and prodcution lines to header, pressure tested production lines to1,150 psi. Support techs R/U hardline for power fluid supply, pressure tested line to 3,650 psi. Support techs set well house. WELL S/I ON ARRIVAL. BEGIN R/U .125 CARBON, 1-7/8'' RS, QC, 8' X 2-1/8 RS (2.60'' wheels), QC, KJ, 5' X 1-7/8'' RS (2.60'' wheels), QC, OJ, QC, KJ, LSS, CHECK ALL ROLL PINS, TIGHTEN ALL CONN. w/ WRENCHES, PT= 250L / 3500H. RAN 3-1/2 DUMMY LTP w/ 1/8'' BRASS TATTLE TALE PIN, TAG @ 16560' SLM, (recover cup of metal shavings)(pins not sheared). RAN 2.73'' CENT., 10' X 1-3/4'' BAILER (flapper), TAG & WORK BAILER @ 16572' SLM, (no recovery, ring on bottom of cent.). WELL S/I ON DEPARTURE. No operations to report. 11/25/2023 - Saturday No operations to report. 11/28/2023 - Tuesday 11/26/2023 - Sunday No operations to report. 11/27/2023 - Monday Well Name Rig API Number Well Permit Number Start Date End Date MP F-10A Fullbore / SL 50-029-22679-01-00 223-027 11/23/2023 1/28/2024 12/1/2023 - Friday No operations to report. 11/29/2023 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary WELL S/I ON ARRIVAL. RAN 3.5 BLB, 5' X 1-1/2'' STEM, 2.375 BLB, GET LRS TO PUMP 60 bbls WHILE WORKING DEPLOMENT SLEEVE @ 16562' SLM. RAN 2.25'' LTP DRIFT w/ 1/8'' BRASS TATTLE TALE TAG @ 16562' SLM (one cup metal shavings in drift, two brass pins sheared). RAN 2.72 CENT., 10' X 1-3/4'' BAILER (flapper), TAG AND WORK BAILER @ 16572' SLM (no recovery, ring on cent.).RAN 2.25'' LTP DRIFT w/ 1/8'' BRASS TATTLE TALE TAG @ 16562' SLM (1 brass pin sheared). WELL S/I ON DEPARTURE Assist SLickline, Pumped 30 bbls Source Water down Tubing, Pumped 30 bbls Diesel down Tubing. 11/30/2023 - Thursday No operations to report. RIG-UP .125 CARBON WIRE. TS = 1.75" RS, 8' x 1-7/8" ROLLER STEM (2.60" whls), KJT 5' x 1-7/8" ROLLER STEM (2.60" whls), OJ, KJT LSS. STACK PCE AND TAKE CONTROL OF WIRE. PULL TREE CAP AND STAB ONTO WELLHEAD. PT PCE 350L / 3500H (Good). LRS TO RIG-UP TO P-SUB AND PT LINES. LRS ASSISTED W/ FLUSH OG TUBING W/ 50bbls DIESEL. TAG DEPLOYMENT SLEEVE @ 16,480' MD W/ 2.75" CENT, 3-1/2" BLB, 1.75" CENT (metal ring on cent). TAG DEPLOYMENT SLEEVE @ 16,480' MD W/ 2.25" LTP DRIFT (all pins sheared, metal ring). LRS ASSISTED W/ FLUSH OG TUBING W/ 50bbls DIESEL. TAG DEPLOYMENT SLEEVE @ 16,480' MD W/ 2.75" CENT, 3-1/2" BLB, 1.75" CENT (metal ring on cent). Wellhead- Wel shut-in on arrival Pre-rig packoff test, Pressured packoff 500/3000 psi for 10 mins all tests good. RDMO.T-0 : I/A-0 : O/A-0 . 12/2/2023 - Saturday RIG-UP .125 CARBON WIRE. TS = 1.75" RS, 8' x 1-7/8" ROLLER STEM (2.60" whls), KJT 5' x 1-7/8" ROLLER STEM (2.60" whls), OJ, KJT LSS. STACK PCE AND TAKE CONTROL OF WIRE. PULL TREE CAP AND STB ONTO WELLHEAD. HOOK-UP POWER FLUID, PT PCE 350L / 3500H (Good). PUMP 4bbls DIESEL W/ TRI-PLEX AT .25bpm (tubing pressured up to 1200psi). TAG DEPLOYMENT SLEEVE AT 16,480' MD W/ 2.75" CENT, EXTENSIONS, 2.20" GAUGE RING(metal ring on cent). TAG DEPLOYMENT SLEEVE AT 16,480' MD W/ 2.25" LTP DRIFT(sheared bottom 3 pins) NO METAL RING. 12/5/2023 - Tuesday 12/3/2023 - Sunday WELL SHUT-IN ON ARRIVAL. RIG-UP .125 CARBON WIRE. TS = 1.75" RS, 8' x 1-7/8" ROLLER STEM (2.60" whls), KJT 5' x 1-7/8" ROLLER STEM (2.60" whls), OJ, KJT LSS. STACK PCE ND TAKE CONTROL OF WIRE. PULL TREE CAP AND STAB ONTO WELLHEAD. PT PCE 350L / 3500H (Good). TAG DEPLOYMENT SLEEVE AT 16,480' MD W/ 2.75" LIB (Impression of f/n). TAG DEPLOYMENT SLEEVE AT 16,480' MD W/ 2.75" CENT, 10' x 1-3/4" BAILER (no recovery, metal ring on cent). TAG DEPLOYMENT SLEEVE AT 16,480' MD W/ 2.25" LTP DRIFT. (sheared 2 pins). 12/4/2023 - Monday Well Name Rig API Number Well Permit Number Start Date End Date MP F-10A Slickline 50-029-22679-01-00 223-027 11/23/2023 1/28/2024 No operations to report. No operations to report. 12/9/2023 - Saturday No operations to report. 12/12/2023 - Tuesday 12/10/2023 - Sunday T/I/O=336/1484/0 (Test Sidoti Seal) Pumped a total of 8.75 bbls diesel down TBG to maintain 1500 psi differential on IA. (See Log). Final Whps=696/45/0 12/11/2023 - Monday 12/8/2023 - Friday RIG-UP .125 CARBON WIRE. TS = 1.75" RS, 8' x 1-7/8" ROLLER STEM (2.60" whls), KJT 5' x 1-7/8" ROLLER STEM (2.60" whls), OJ, KJT LSS. STACK PCE AND TAKE CONTROL. PULL TREE CAP AND STAB ONTO WELLHEAD. PT PCE 350L / 3500H (Good). RIH W/ 3-1/2" GS. NS UPPER PACKER, 3" JETPUMP (ratio - 12B, sidoti seal)SNAPLATCH ASSY (oal - 128"). S/D@ 16,478' SLM AND STING INTO LOWER ANCHOR, SET UPPER PKR W/ JETPUMP, PICK-OFF CLEAN. POOH. OOH W/ SHEARED GS. BLED IA FROM 650psi TO 200psi, MONITORED FOR 15 MINUTES AND HOLDING SOLID. TUBING REMAINED CONSTANT AT 1100psi. BEGIN RIG- DOWN. RIG-DOWN COMPLETE, WELL SHUT-IN ON DEPARTURE. 12/6/2023 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary RIG-UP .125 CARBON WIRE. TS = 1.75" RS, 8' x 1-7/8" ROLLEER STEM (2.60" whls), KJT 5' x 1-7/8" ROLLER STEM (2.60" whls), OJ, KJT LSS. CUT AND RE-TIE ROPE SOCKET, M/U STUFFING BOX. STACK PCE AND TAKE CONTROL OF WIRE. PULL TREE CAP AND STAB ONTO WELLHEAD. PT PCE 350L / 3500H (Good). SET NORTHERN SOLUTIONS LTP IN DEPLOYMENT SLEEVE AT 16,480' MD. PERFORMED SUCCESSFUL PRESSURE TEST TO 1000psi W/ TRI-PLEX.PULL 2-3/8" R-PLUG FROM LTP AT 16,480' MD. WELL SHUT-IN ON DEPARTURE, PAD OP NOTIFIED. 12/7/2023 - Thursday WELL S/I UPON ARRIVAL. PT LOW 250PIS HIGH 3500PSI. TUBING PUNCH 16,415' TO 16,420' WITH 5' OF 1.56" CHARGES 4SPF 0 DEG PHASED. SET NORTHER SOLUTIONS MONO-PAK AT COE 16,423'. Well Name Rig API Number Well Permit Number Start Date End Date MP F-10A Slickline 50-029-22679-01-00 223-027 11/23/2023 1/28/2024 12/15/2023 - Friday WELL S/I ON ARRIVAL. BEGIN R/U .125 CARBON, 1-7/8'' RS, QC, 8' X 1-7/8'' RS (2.60'' wheels), QC, KJ, 5' X 1-7/8'' QC, OJ, QC, KJ, LSS, CHECK ALL ROLL PINS, TIGHTEN ALL CONN. w/ WRENCHES, PT= 250L / 3500H. LATCH UPPER PACKER w/ 3'' JET PUMP @ 16478' SLM, JAR @ 1900# FOR 1 HOUR, TRY TO SHEAR OFF UNABLE TO SHEAR, DROP KINLEY CUTTER, WIRE CUT WHEN CUTTER HIT ROPE SOCKET, (recover all wire). TOOLS LIH, 1-7/8'' RS, QC, 8' X 1-7/8'' RS (2.60'' wheels), QC, KJ, 5' X 1-7/8'' QC, OJ, QC, KJ, LSS, QC, 3-1/2 GR (oal= 403''), 1-7/8'' RS, 7' X 1-7/8'' RS (2.60'' wheels), X-OVER, 1-1/2'' QC, 1-3/8'' JD, KINLEY CUTTER (oal= 156''). WELL S/I ON DEPARTURE. 12/13/2023 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary WELL FLOWING ON ARRIVAL. LRS DISPLACED TUBING WITH 50bbls CRIESEL (Hot). BEGIN R/U .125 CARBON, 1-7/8'' RS, QC, 8' X 1-7/8'' RS (2.60'' wheels), QC, KJ, 5' X 1-7/8'' QC, OJ, QC, KJ, LSS, CHECK ALL ROLL PINS, TIGHTEN ALL CONN. w/ WRENCHES, PT= 250L / 3500H. PULL 3-1/2" JETPUMP (ratio: 13B, speciality upper diffuser) FROM XD-SS AT 5,191' MD. SET 3-1/2" JET PUMP (ratio: 12A, tungsten carbide upper/lower diffuser) IN XD-SS AT 5,191' MD. WELL FLOWING ON DEPARTURE, PAD OP NOTIFIED. 12/14/2023 - Thursday No operations to report. BEGIN R/U 3/16'' CABLE, 1-7/8'' RS, SWIVEL, QC, 10' X 1-7/8'' RS (2.60'' wheels), QC, KJ, 5' X 1-7/8'' RS (2.60'' wheels), QC, 8' X 1-7/8'' RS (2.60'' wheels), QC, KJ, 5' X 1-7/8'' (2.60'' wheels), QC, OJ, QC, 5' X 1-7/8'' RS (2.60'' wheels), QC, KJ, LSS, CHECK ALL ROLL PINS, TIGHTEN ALL CONN. w/ WRENCHES, PT= 250L / 3500H. MADE 2 RUNS w/ 3-1/2 GS, LATCH UPPER PACKOFF w/ 3'' JET PUMP @ 16330' BLM, JAR @ 3500 TO 3800# FOR 2.15 TOTAL HOURS. WELL S/I ON DEPARTURE. No operations to report. 12/16/2023 - Saturday CHANGE OUT LINE WIPER RUBBER, BEGIN R/U 3/16'' CABLE, 1-7/8'' RS, SWIVEL, QC, 10' X 1-7/8'' RS (2.60'' wheels), QC, KJ, 5' X 1-7/8'' RS (2.60'' wheels), QC, OJ, QC, KJ, LSS, CHECK ALL ROLL PINS, TIGHTEN ALL CONN. w/ WRENCHES, PT= 250L / 3500H. PULL FISH @ 16305' BLM. LATCH UPPER PACKOFF & JET PUMP @ 16330' BLM, JAR @ 3500# FOR 2.5 hrs 12/19/2023 - Tuesday 12/17/2023 - Sunday RIG UP 3/16 CABLE. CONTINUE RIGGING UP, TRI-PLEX KEPT DIEING, WENT GET ANOTHER ONE, PT= 250L / 3500H. PULL CUTTER @ 16292' BLM. LATCH FISH @ 16305' BLM, (sheared off). WELL S/I ON DEPARTURE. 12/18/2023 - Monday Well Name Rig API Number Well Permit Number Start Date End Date MP F-10A CTU #1/ Fullbore /Slickline 50-029-22679-01-00 223-027 11/23/2023 1/28/2024 No operations to report. RAN 3-1/2 BLB, 2.62'' CENT., 5' X 2'' BAILER (ball), TAG & WORK BAILER @ 16475' SLM, (no recovery) RAN NS UPPER PACKER, 3'' JET PUMP (ratio: 12B, sidoti seal, tungsten diffuser, screen, soft set, BHP ser# 81338, batt in @ 14:05, oal= 291'') SET @ 16470' SLM, POOH, PRESSURE UP ON TUBING TO 950 psi, IA STAYED @ 800 psi, GOOD TEST. WELL S/I ON DEPARTURE. LRS CTU #1 w/1.5" Blue Coil. Job Objective: Fish Jet Pump Patch. Load pig, blow down string RDMO CTU. Travel to deadhorse. Job complete. 12/23/2023 - Saturday No operations to report. 12/26/2023 - Tuesday 12/24/2023 - Sunday No operations to report. 12/25/2023 - Monday 12/22/2023 - Friday Cont RIH. Venturi through JP setting area down to 16,500. Pick up and dry drift down. Tag at 16528. Make 1 more pass through area and tag same spot while pumping. POOH and found thimble amount of small metal debris. Discuss plan forward with OE. Make up yellow jacket motor and mill BHA for cleanout run. RIH and agged fish/debris at 16,515', worked through high dog leg area, then pushed free to 18,241', pump gel sweep on bottom and chase OOH. Perform injectivity test, .5bpm=1320 .8bpm=1530. FP well with 22bbls 60/40. FP CT. L/D YJ milling BHA. RDMO 12/20/2023 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary No operations to report. 12/21/2023 - Thursday MIRU CTU. PT Lube/PCE to 400/3600psi - good. Make up Yellow Jacket fishing BHA. RIH and latch JP, release after 2 jar hits. POOH. Recovered JP (Total 10.5') L/D tools. M/U YJ venturi. RIH. Well Name Rig API Number Well Permit Number Start Date End Date MP F-10A LRS 50-029-22679-01-00 223-027 11/23/2023 1/28/2024 No operations to report. No operations to report. 12/30/2023 - Saturday No operations to report. 1/2/2024 - Tuesday 12/31/2023 - Sunday No operations to report. 1/1/2024 - Monday 12/29/2023 - Friday No operations to report. 12/27/2023 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary Test Pump, Pumped 25 bbls DIesel down Tubing, Pressure up Tubing for 10 min 12/28/2023 - Thursday Heat Upright H-06 with 230 bbls of brine to 140* Well Name Rig API Number Well Permit Number Start Date End Date MP F-10A LRS 50-029-22679-01-00 223-027 11/23/2023 1/28/2024 No operations to report. Heat Upright H-06 w/ 230 bbls brine to 140* 1/6/2024 - Saturday No operations to report. 1/9/2024 - Tuesday 1/7/2024 - Sunday No operations to report. 1/8/2024 - Monday 1/5/2024 - Friday No operations to report. 1/3/2024 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary No operations to report. 1/4/2024 - Thursday No operations to report. Well Name Rig API Number Well Permit Number Start Date End Date MP F-10A LRS 50-029-22679-01-00 223-027 11/23/2023 1/28/2024 Freeze Protect, Pumped 24 bbls Diesel down Tubing, Pumped 3 bbls 60/40 down Production Lateral, Pumped 3 bbls 60/40 down Test Lateral, Pumped 3 bbls 60/40, 66 bbls diesel, 8 bbls 60/40 down IA from PFL header Tee 77 bbls total down IA from tie in point. No operations to report. 1/13/2024 - Saturday No operations to report. 1/16/2024 - Tuesday 1/14/2024 - Sunday No operations to report. 1/15/2024 - Monday 1/12/2024 - Friday No operations to report. 1/10/2024 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary No operations to report. 1/11/2024 - Thursday No operations to report. Well Name Rig API Number Well Permit Number Start Date End Date MP F-10A LRS 50-029-22679-01-00 223-027 11/23/2023 1/28/2024 No operations to report. No operations to report. 1/27/2024 - Saturday No operations to report. 1/30/2024 - Tuesday 1/28/2024 - Sunday Heat Upright H-06 with 230 bbls brine to 150* 1/29/2024 - Monday 1/26/2024 - Friday No operations to report. 1/24/2024 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary No operations to report. 1/25/2024 - Thursday No operations to report. 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Convert to Injector 2.Operator Name: 4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number): 10. Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 18,265'N/A Casing Collapse Conductor 520psi Surface 3,090psi Production 5,410psi Liner 8,100psi Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Wells Manager Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng MILNE PT UNIT F-10A MILNE POINT KUPARUK RIVER OIL N/A 7,252' 18,239' 7,257' 3,051 N/A Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): 2/20/204 Perforation Depth MD (ft): STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025509, ADL0355018 & ADL0388235 223-027 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22679-01-00 Hilcorp Alaska LLC C.O. 432E Length Size Proposed Pools: 112' 112' 9.2# / L-80 TVD Burst 16,547' MD 1,530psi 5,750psi 7,700psi 4,484' 7,252' 8,635' 18,265' 16,704' 7,233' 7,240psi 80' 20" 9-5/8" 2-3/8" 8,604' 1,785' 16,675' 7" ryan.lewis@hilcorp.com 303-906-5178 See Schematic See Schematic 3-1/2" Baker S-3 Packer and N/A 16,477 MD/ 7,073 and N/A Ryan Lewis No Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov By Samantha Coldiron at 2:53 pm, Feb 09, 2024 324-075 Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2024.02.09 13:40:00 - 09'00' Taylor Wellman (2143) 3,051 * State witnessed MIT-IA to 3000 psi within 10 days of stabilized injection. * Note: This MPU F pad well does not require a SSSV or injection check valve as it was completed prior to 2010 regulation re-write. DSR-2/13/24SFD 2/20/202429FEB2024 10-404 SFD *&: Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2024.02.29 11:51:06 -09'00'02/29/24 RBDMS JSB 030124 Convert to Injector Well: MPU F-10A PTD: 223-027 Well Name:MPU F-10A API Number:50-029-22679-01-00 Current Status:Oil Well Pad:F-Pad Estimated Start Date:2/20/24 Rig:SL Reg. Approval Req’d?Yes Date Reg. Approval Rec’vd: Regulatory Contact:Tom Fouts Permit to Drill Number:223-027 First Call Engineer:Ryan Lewis (303) 906-5178 (M) Second Call Engineer:Taylor Wellman (907) 777-8449 (O) (907) 947-9533 (M) AFE Number:Job Type:Convert to JP Current Bottom Hole Pressure: 3,792 psi @ 7,411’ TVD SBHPS taken 08/19/2023 |9.9 PPGE Maximum Expected BHP:3,792 psi @ 7,411’ TVD SBHPS taken 08/19/2023 |9.9 PPGE Max Potential Surface Pressure: 3,051 psi Gas Column Gradient (0.1 psi/ft) Max Angle:76° @ 9,059’ MD within parent bore Max Dogleg Severity: 8.6 deg/100’ @ 8,133’ MD within parent bore Brief Well Summary: The original parent wellbore, MPF-10 was an injector. In 2023, MPU F-10A was drilled as a slant producer in the Kuparuk A-sand and sidetracked to the North and expecting to cross a fault to access un-swept oil (PTD 223-027). The fault was never seen during the drilling operations. The temp flow from the sidetrack is still producing 100% WC and therefore we want to return it to an injector to support MPF-29. Hilcorp requests a variance to 20 AAC 25.412(b) requirement of placing the packer within 200’ measured depth of the top perforation is requested. The CTD lateral was drilled and cemented back to the parent well and it is not possible to have the 4-1/2” x 7” packer within 200’ MD of the perforations. Top perf 17,569’ MD and the Packer 16,477’ MD, is 1,092’ above the top perf in the 7” parent bore. As stated above the CTD target had converted this well to a production well but after flow testing, it serves more beneficial use as an injector. Notes Regarding Wellbore Condition x MIT-IA to 3,244 psi completed on 6/27/2023. Objective x Pull the JP, patch and gauge. x Set Patch across tubing punch holes and put on injection. Slickline/Braidedline 1. MIRU Slickline. Pressure test PCE to 250 psi low / 3,500 psi high. 2. RIH with a dogless G retrieving head to confirm we can get down to the patch. 3. RIH and pull the upper packer of the patch, JP and gauge. This will leave the Lower packer of the patch still in place to sting back in to. 4. Circulate around the backside with 362 bbls (13,720’) Inhibited source water and 71 bbl (2,700’) diesel freeze protect. 5. MU and RIH set the snap latch, spacer pipe and upper packer across tubing punch holes (16,415- 16,420’). 6. POOH and RDMO. Convert to Injector Well: MPU F-10A PTD: 223-027 Attachments: x Current Schematic x Proposed Schematic x AOR _____________________________________________________________________________________ Revised By: DH 2/5/2024 SCHEMATIC Milne Point Unit Well: MP F-10A Last Completed: 12/8/2023 PTD: 223-027 JEWELRY DETAIL No Depth Item 1 16,477’ Baker S-3 Packer 2 16,480’ 2-3/8” x 3-1/2” LTP 3 16,535’ 3-1/2” HES XN Nipple (2.75” ID) 4 16,547’ 3-1/2” WLEG WELL INCLINATION DETAIL KOP @ 6,000’ Max Angle is 75 deg. @ 7,500’ TREE & WELLHEAD Tree 3-1/8” 5M FMC Wellhead 11” 5M FMC Gen5A w/ FMC Tbg. Hng. 4.5” ACME Top, 3.5” EUE Btm. CIW H BPV Hanger Landing Threads 4.5” Left Hand ACME GENERAL WELL INFO API: 50-029-22679-01-00 Initial Completion by Polar 1 - 7/3/1996 Sidetracked and Completed by CDR2 – 12/8/2023 20” Orig KB Elev.: 40.75’ / Orig GL Elev.: 12.5’ 7” 1 4 9-5/8” TubingPunch: 16,415’ to 16,420’ ELM on 12/7/2023 3 Top of Liner Lap 16,485’ MD Whipstock set @ 16,700’ Top of Window @ 16,704’ TD =18,265’(MD) / TD=7,252’(TVD) PBTD =18,239’ (MD) /PBTD=7,257’(TVD) Tubing Patch: 16,407’ to 16,423’ ELM on 12/18/2023 Kuparuk A1 2 OPEN HOLE / CEMENT DETAIL 24” 250 sx Arctic Set (Approx.) 12-1/4” 1590 sx PF E, 1026 sx Class G 8-1/2” 220 sx Class G CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 19.124 Surface 112’ 0.3553 9-5/8" Surface 40 / L-80 / Buttress 8.835” Surface 8,635’ 0.0758 7” Production 26 / L-80 / BTC 6.276” Surface 16,704’ 0.0383 2-3/8” Liner 4.7 / L-80 / Hyd 511 1.995” 16,480’ 18,265’ 0.0039 TUBING DETAIL 3-1/2” Tubing 9.2 / L-80 / NSTC 2.992” Surface 16,547’ 0.0087 PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup. A1 Sands 17,569’ 18,239’ 7,266’ 7,257’ 670 11/12/2023 Open Perforation Data for 11/12/2023: 1.56” Dia. Guns @ 6spf. _____________________________________________________________________________________ Revised By: DH 2/5/2024 PROPOSED Milne Point Unit Well: MP F-10A Last Completed: 12/8/2023 PTD: 223-027 JEWELRY DETAIL No Depth Item 1 16,477’ Baker S-3 Packer 2 16,480’ 2-3/8” x 3-1/2” LTP 3 16,535’ 3-1/2” HES XN Nipple (2.75” ID) 4 16,547’ 3-1/2” WLEG WELL INCLINATION DETAIL KOP @ 6,000’ Max Angle is 75 deg. @ 7,500’ TREE & WELLHEAD Tree 3-1/8” 5M FMC Wellhead 11” 5M FMC Gen5A w/ FMC Tbg. Hng. 4.5” ACME Top, 3.5” EUE Btm. CIW H BPV Hanger Landing Threads 4.5” Left Hand ACME GENERAL WELL INFO API: 50-029-22679-01-00 Initial Completion by Polar 1 - 7/3/1996 Sidetracked and Completed by CDR2 – 12/8/2023 20” Orig KB Elev.: 40.75’ / Orig GL Elev.: 12.5’ 7” 1 4 9-5/8” TubingPunch: 16,415’ to 16,420’ ELM on 12/7/2023 3 Top of Liner Lap 16,485’ MD Whipstock set @ 16,700’ Top of Window @ 16,704’ TD =18,265’(MD) / TD=7,252’(TVD) PBTD =18,239’ (MD) /PBTD=7,257’(TVD) Replace Patch: 16,407’ to 16,423’ ELM Kuparuk A1 2 OPEN HOLE / CEMENT DETAIL 24” 250 sx Arctic Set (Approx.) 12-1/4” 1590 sx PF E, 1026 sx Class G 8-1/2” 220 sx Class G CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 19.124 Surface 112’ 0.3553 9-5/8" Surface 40 / L-80 / Buttress 8.835” Surface 8,635’ 0.0758 7” Production 26 / L-80 / BTC 6.276” Surface 16,704’ 0.0383 2-3/8” Liner 4.7 / L-80 / Hyd 511 1.995” 16,480’ 18,265’ 0.0039 TUBING DETAIL 3-1/2” Tubing 9.2 / L-80 / NSTC 2.992” Surface 16,547’ 0.0087 PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup. A1 Sands 17,569’ 18,239’ 7,266’ 7,257’ 670 11/12/2023 Open Perforation Data for 11/12/2023: 1.56” Dia. Guns @ 6spf. Ar e a o f R e v i e w S u m m a r y – M i l n e P o i n t U n i t F - 1 0 A ( P T D 2 2 3 - 0 2 7 ) Th i s A r e a o f R e v i e w i s r e q u i r e d p r i o r t o t h e c o n v e r s i o n o f w e l l M P U F - 1 0 A f r o m a p r o d u c e r t o a n i n j e c t o r . T h i s A O R d i s c u s s e s w e ll s wi t h ¼ m i l e o f t h e w e l l ’ s e n t r y p o i n t i n t o t h e K u p a r u k t o t h e b o t t o m o f M P U F - 1 0 A w e l l b o r e c o m p l e t i o n . Fi g u r e 1 : M a p s h o w i n g w e l l s w i t h i n ¼ m i l e r a d i u s f r o m M P U F - 1 0 A . Th e l i s t o f a l l o p e r a t o r s a n d s u r f a c e o w n e r s w i t h i n ¼ m i l e o f M P U F - 1 0 A i s b e l o w : # O p e r a t o r s # S u r f a c e O w n e r s 1 H i l c o r p A l a s k a , L L C 1 A l a s k a D e p a r t m e n t o f N a t u r a l R e s o u r c e s ( A D N R ) Ta b l e 1 : L i s t o f o p e r a t o r s a n d s u r f a c e o w n e r s MP F - 1 0 , t h e o r i g i n a l p a r e n t b o r e , w a s a n i n j e c t o r . M P F - 1 0 A w a s a C T D s i d e t r a c k t a r g e t i n g o i l a c r o s s a f a u l t . D u r i n g t h e d r i l l in g o p e r a t i o n s w e ne v e r e n c o u n t e r e d t h e f a u l t . W e p e r f o r a t e d a n d J e t P u m p e d t h e w e l l f o r 3 0 d a y s a n d i t p r o d u c e d s o m e o i l e a r l y o n a n d g r a d u a l l y w e n t t o 1 0 0 % wa t e r . W e a r e g o i n g t o c o n v e r t i t t o i n j e c t i o n t o s u p p o r t M P F - 2 9 . Ar e a o f R e v i e w M P U F - 1 0 A K u p a r u k I n j C o n v e r s i o n WE L L ST A T U S To p o f Ku p a r u k (M D ) To p o f Ku p a r u k (T V D ) To p o f C e m e n t (M D ) To p o f C e m e n t (T V D ) K u p a r u k s t a t u s Z o n a l I s o l a t i o n MP F - 1 0 In j e c t o r 1 6 , 6 8 5 7 , 2 1 9 16 , 4 2 4 7, 0 3 6 C e m e n t e d 2 6 0 s a x c l a s s G i n 8 - 1 / 2 ' ' h o l e MP F - 1 0 A SI p r o d u c e r 1 6 , 6 8 5 7 , 2 1 9 16 , 4 8 0 7, 0 7 5 C e m e n t e d 7 7 s a x c l a s s G i n 3 - 1 / 4 ' ' h o l e Agr e e . S F D MP F - 1 0 A P B 1 : A b a n d o n e d b o r e h o l e s e c t i o n t h a t l i e s e n t i r e l y w i t h i n t h e K u p r e s e r v o i r . S F D 22 0 s a c k s S F D 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing OTHER:__________ 2.Operator Name: 4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number): 10. Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 18,265'N/A Casing Collapse Conductor 520psi Surface 3,090psi Production 5,410psi Liner 8,100psi Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Wells Manager Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng MILNE PT UNIT F-10A MILNE POINT KUPARUK RIVER OIL N/A 7,252' 18,248' 7,255' 3,051 N/A Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): 1/3/2024 Perforation Depth MD (ft): STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025509, ADL0355018 & ADL0388235 223-027 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22679-01-00 Hilcorp Alaska LLC C.O. 432E Length Size Proposed Pools: 112' 112' 9.2# / L-80 / NSTC TVD Burst 16,547' MD 1,530psi 5,750psi 7,700psi 4,484' 7,252' 8,635' 18,265' 16,704' 7,233' 7,240psi 80' 20" 9-5/8" 2-3/8" 8,604' 1,785' 16,675' 7" ryan.lewis@hilcorp.com 303-906-5178 See Schematic See Schematic 3-1/2" Baker S-3 Packer and N/A 16,477 MD/ 7,073 and N/A Ryan Lewis _ No Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 7:59 am, Dec 22, 2023 Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2023.12.21 15:40:06 - 09'00' Taylor Wellman (2143) 323-685 1/3/2024 MGR26DEC23 * BOPE test to 3500 psi. Annular to 2500 psi. * Perforating BHA not to exceed 500'. * Change to approved Sundry 323-491 - spOit stack, change spools 10-404 SFD 12/26/2023*&:JLC 12/27/2023 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.12.27 13:38:53 -09'00'12/27/23 RBDMS JSB 122823 Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO Well Name:MPU F-10A API Number:50-029-22679-01-00 Current Status:Oil Well Pad:F-Pad Estimated Start Date:January 3rd 2023 Rig:CTU/E-line/ASR Reg. Approval Req’d?Yes Date Reg. Approval Rec’vd: Regulatory Contact:Tom Fouts Permit to Drill Number:223-027 First Call Engineer:Ryan Lewis (303) 906-5178 (M) Second Call Engineer:Taylor Wellman (907) 777-8449 (O) (907) 947-9533 (M) AFE Number:231-00063 Job Type:APERF / ESP RWO Current Bottom Hole Pressure: 3,792 psi @ 7,411’ TVD SBHPS taken 08/19/2023 |9.9 PPGE Maximum Expected BHP:3,792 psi @ 7,411’ TVD SBHPS taken 08/19/2023 |9.9 PPGE Max Potential Surface Pressure: 3,051 psi Gas Column Gradient (0.1 psi/ft) Max Angle:76° @ 9,059’ MD within parent bore Max Dogleg Severity: 8.6 deg/100’ @ 8,133’ MD within parent bore Tie in Log: To be provided by Geologist Brief Well Summary: MPU F-10A is a slant producer in the Kuparuk A-sand that will be sidetracked across a fault to the North beyond to access unswept oil (PTD 223-027). It is believed the fault to the North is not in communication with the current MPU F-10 parent block. Objectives: x Perforate high resistivity intervals within the cemented F-10A lateral using perf guns conveyed on service coil. x Perform Tubing Cut and remove 3-1/2” tubing, run 2-7/8” ESP completion. Notes Regarding Wellbore Condition: x June 2023 -MIT-IA Passed @ 3244 psi. x On initial rig up all formations should be isolated via cement pumped by CDR2 and possible Liner Top Packer (LTP). x If the BHP is confirmed below the 8.55ppg EMW and in conformance with CO 390A, no packer will be run and the completion will be adjusted to remove. Procedure Coiled Tubing:Perforating completed on CTD rig via PTD: 223-027 Notes: x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO 1. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 2.Circulate ~154 bbls 10.1 brine (Confirm CDR2 KWF used) during logging run. (Bullheading is not possible prior to first gun run, but up to WSS discretion to bullhead once a fluid path is created.) Confirm CDR2 did not leave KWF in hole, current procedure calls for KCl water. a. Estimated Wellbore volume to PBTD = 153.5 bbls b. 3-1/2” Liner – 16,500’ x 0.0087 = 143.5 bbls c. 2-3/8” Liner – 2,570’ x 0.0039 = 10 bbls 3. MU and RIH with logging tools and drift BHA: 1.56” dummy gun & nozzle. 4. Flag pipe as appropriate per WSS for adperf runs. 5. POOH and freeze protect tubing as needed. 6. Confirm good log data. Send to Geologist for depth correction: a. Graham Emerson - graham.emerson@hilcorp.com / 907-793-0315. 7. At surface, prepare for deployment of TCP guns. 8. Confirm well is dead. Bleed any pressure off to return tank. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 9. *Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a. At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 10.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 11. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule. a. All gross intervals will be < 500’. b. Note any tubing pressure change in WSR. 12. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface. 13. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 14. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 15. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 16. RDMO CTU. 17. Freeze protect well. Slickline (Non-Sundried) 1. RU SL unit and pressure test PCE to 250psi/2,500psi high. 2. RIH pull the patch with JP. POOH. 3. RIH pull the lower element. POOH. 4. Run SBHPS to confirm BHP, to calculate KWF and MASP. 5. RD SL Unit. E-Line (Sundried Steps) 1. MIRU EL, PT PCE to 250 psi low / 3,500 psi high Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO 2. RIH with a mechanical cutter 3. Cut 5’ below collar on first full joint of 3.5” 9.2# L-80 NSTC above the packer. Estimated cut depth ~16,450’ RKB. 4. RDMO Pumping and Well Support 1. Clear and level pad area in front of well. Spot rig mats and containment. 2. RD well house and flowlines. Clear and level area around well. 3. RU Little Red Services. RU reverse out skid and 500 bbl returns tank. 4. Pressure test lines to 3,000 psi. 5. Circulate at least one wellbore volume with 10.1 ppg brine (confirm KWF after perforations) down tubing, taking returns up casing to 500 bbl returns tank. 6. Confirm well is dead. Freeze protect tubing/casing as needed with 60/40 MeOH or diesel. 7. RD Little Red Services and reverse out skid. 8. Set BPV. 9. ND Tree. NU BOPE. Brief RWO Procedure 1. MIRU Hilcorp ASR #1 WO Rig, ancillary equipment and lines to 500 bbl returns tank. 2. Check for pressure and if 0 psi set CTS plug. If needed, bleed off any residual pressure off tubing and casing. a. If required, kill well w/ 10.1 ppg (confirm KWF based on updated SBHP) ppg brine prior to setting CTS 3. Test BOPE to 250 psi Low/ 3,500 psi High, annular to 250 psi Low/ 2,500 psi High (hold each ram/valve and test for 5-min). Record accumulator pre-charge pressures and chart tests. a. Perform Test per ASR 1 BOP Test Procedure. b. Notify AOGCC 24 hours in advance of BOP test. c. If MPSP falls below 3,000 psi after CTD sidetrack, test to BOP to 3,000 high, remove third set of pipe rams. Notify AOGCC of change. d. Confirm test pressures per the Sundry Conditions of approval. e. Test VBR ram on 2-7/8” and 3-1/2” test joints. f. Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 4. Bleed any pressure off casing to the returns tank. Pull CTS plug. Bleed any pressure off tubing to the returns tank. Kill well w/ 10.1 ppg brine as needed. Pull BPV. a. If indications show pressure underneath BPV, lubricate out BPV. 5. MU landing joint or spear and PU on the tubing hanger. 6. Confirm hanger free, lay down tubing hanger. 7. POOH and lay down the 3-1/2” tubing. a. Keep all jewelry and tubing joints. b. Note any over-torqued or damaged connections and set aside for disposal. 8. MU/RIH with 7” RBP on 2-7/8” 6.5# L-80 tubing and set @ 6,900’MD (3,996’ TVD). 9. Test casing to 3,000 psi for 30 min, charted. 10. POOH 3 joints and pick up packer. 11. RIH one joint and set packer. Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO 12. Test packer to 3,000 psi for 30 min, charted. 13. Confirm casing packoffs have been tested and OA pressure bled off. 14. Split the BOP stack and remove 7 x 11 spool and install 11 x 11 spool. 15. Test packoff (this will test casing spool by new tubing spool break) 16. Test BOPE shell test to 250 psi low/ 2,500 psi high for 5-min. 17. Release packer and pull packer out of hole. 18. RIH and engage RBP. 19. POOH with RBP, while filling hole with 2x pipe displacement. 20. PU new ESP and RIH on 2-7/8” tubing. Set base of ESP at ± 16,420’ MD. a. Check electrical continuity every 1,000’. b. Note PU and SO weights on tally. c. Install ESP clamps per ESP hand, and cross coupling clamps every other joint. a. Photograph vent packer prior to running in hole. Nom. (OD)Length Item Lb/ft Material Notes 5.85 2 Centralizer 4 ~16,420’ MD 4.5 2 Intake Sensor 30 5.62 34 Motor 80 5.2 7 Lower Tandem Seal 38 5.2 7 Upper Tandem Seal 38 5.2 8 Gas Separator 52 5.38 ~57 Pump 45 1 Ported Discharge Head 13 L-80 2-7/8" 10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 30 2-7/8" EUE 8rd L-80 6.5 L-80 2-7/8"10 XO 2-7/8" X 2-3/8” EUE 8rd Pup Jt 6.5 L-80 2-3/8"2 2-3/8” XN-nipple 6.5 L-80 2-7/8"10 XO 2-7/8" X 2-3/8” EUE 8rd Pup Jt 6.5 L-80 2-7/8" 60 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8"10 XO 2-7/8" X 2-3/8” EUE 8rd Pup Jt 6.5 L-80 2-3/8"8 2-3/8" x 1" GLM, DV installed 6.5 L-80 2-7/8"10 XO 2-7/8" X 2-3/8” EUE 8rd Pup Jt 6.5 L-80 2-7/8" ~13,160 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8"10 XO 2-7/8" X 2-3/8” EUE 8rd Pup Jt 6.5 L-80 2-3/8"2 2-3/8” X-nipple with RHC profile 6.5 L-80 RHC Installed 2-7/8"10 XO 2-7/8" X 2-3/8” EUE 8rd Pup Jt 6.5 L-80 2-7/8" 31 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8"10 XO 2-7/8" X 2-3/8” EUE 8rd Pup Jt 6.5 L-80 2-7/8"8 2-7/8" x 1" GLM, DV installed 6.5 L-80 2-7/8"10 XO 2-7/8" X 2-3/8” EUE 8rd Pup Jt 6.5 L-80 2-7/8" 31 2-7/8" EUE 8rd Jt 6.5 L-80 30 Packer, Reduced ID Viking ESP Retr. Dual Vent ~3,000 MD 3-1/2” 10 2-7/8" EUE 8rd x 3-1/2" EUE 8rd Jt 9.3 L-80 Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO 3-1/2" ~2,650 3-1/2" EUE 8rd Jt 9.3 L-80 3-1/2"10 3-1/2" EUE 8rd Pup Jt 9.3 L-80 3-1/2"8 3-1/2" x 1" GLM, DV installed 9.3 L-80 ~150 MD 3-1/2"10 3-1/2" EUE 8rd Pup Jt 9.3 L-80 3-1/2" 150 3-1/2" EUE 8rd Jt 9.3 L-80 3-1/2" 10 Space out pup 9.3 L-80 3-1/2" 30 Tubing Hanger with full joint 9.3 L-80 21. PU and MU Reduced ID Viking vented packer. Verify that there are four (4) setting shear pins and confirm with OE number of release shear pins. a. Target release pins to shear at 20,000 pounds overpull. 22. Terminate the ESP cable and make up the ESP penetrator to the ESP cable. Ensure the 3/8” NPT control line feed thru port is dummied off. 23. Make up the control line to the dual vent valves. Pressure up on the control line to 5,000 psi and hold for 5 minutes checking for leaks (note the opening pressure in the daily report). Bleed the pressure to 500 psi and maintain 500 psi while running in hole. a. Periodically confirm control line is maintaining 500 psi. 24. Continue running ESP completion per plan. 25. PU and MU the 3-1/2” tubing hanger. Make final splice of the ESP cable to the penetrator. MU the control line to the tubing hanger and dummy off any additional control line ports if present. 26. Land tubing hanger, avoiding any damage to ESP cable or control line. RILDS. Lay down landing joint. Note PU and SO weights on tally and in daily report. 27. Drop ball and rod. 28. Pressure up on tubing to 4,000 psi and hold for 15 minutes to set the ESP packer. 29. Bleed tubing to 0 psi. 30. Pressure up on tubing to 4,000 psi and hold for 5 more minutes and then bleed to 0 psi. 31. Bleed packer control line to 0 psi, closing packer vent valves. 32. Slowly pressure up IA at 50 psi/min to 1,500 psi and hold for 30 minutes. Chart test. Bleed off at the same 50 psi/min rate posttest to ensure we do not decompress the ESP cable. 33. Lay down landing joint. 34. Set BPV. 35. RDMO ASR Post-Rig Procedure (Non-Sundried Work): Well Support 1. RD mud boat. RD BOPE house. Move to next well location. 2. RU crane. ND BOPE, set CTS plug, and NU tree. 3. Test tubing hanger void to 500 psi low/5,000 psi high. Pull CTS and BPV. 4. RD crane. Move 500 bbl returns tank and rig mats to next well location. 5. RU well house and flowlines. Slickline _____________________________________________________________________________________ Revised By: TDF 12/21/2023 SCHEMATIC Milne Point Unit Well: MP F-10A Last Completed: 12/8/2023 PTD: 223-027 JEWELRY DETAIL No Depth Item 1 16,477’ Baker S-3 Packer 2 16,480’ 2-3/8” x 3-1/2” LTP 3 16,535’ 3-1/2” HES XN Nipple (2.75” ID) 4 16,547’ 3-1/2” WLEG WELL INCLINATION DETAIL KOP @ 6,000’ Max Angle is 75 deg. @ 7,500’ TREE & WELLHEAD Tree 3-1/8” 5M FMC Wellhead 11” 5M FMC Gen5A w/ FMC Tbg. Hng. 4.5” ACME Top, 3.5” EUE Btm. CIW H BPV Hanger Landing Threads 4.5” Left Hand ACME GENERAL WELL INFO API: 50-029-22679-00-00 Initial Completion by Polar 1 - 7/3/1996 Sidetracked and Completed by CDR2 – 12/8/2023 20” Orig KB Elev.: 40.75’ / Orig GL Elev.: 12.5’ 7” 1 4 9-5/8” TubingPunch: 16,415’ to 16,420’ ELM on 12/7/2023 3 Top of Liner Lap 16,485’ MD Whipstock set @ 16,700’ Top of Window @ 16,704’ TD =19,070’(MD) / TD=7,251’(TVD) PBTD =19,050’ (MD) /PBTD=7,255’(TVD) Tubing Patch: 16,407’ to 16,423’ ELM on 12/18/2023 Kuparuk A1 2 OPEN HOLE / CEMENT DETAIL 24” 250 sx Arctic Set (Approx.) 12-1/4” 1590 sx PF E, 1026 sx Class G 8-1/2” 220 sx Class G CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 19.124 Surface 112’ 0.3553 9-5/8" Surface 40 / L-80 / Buttress 8.835” Surface 8,635’ 0.0758 7” Production 26 / L-80 / BTC 6.276” Surface 16,704’ 0.0383 2-3/8” Liner 4.7 / L-80 / Hyd 511 1.995” 16,480’ 18,265’ 0.0039 TUBING DETAIL 3-1/2” Tubing 9.2 / L-80 / NSTC 2.992” Surface 16,547’ 0.0087 PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup. A1 Sands 17,569’ 18,239’ 7,266’ 7,257’ 670 11/12/2023 Open Perforation Data for 11/12/2023: 1.56” Dia. Guns @ 6spf. _____________________________________________________________________________________ Revised By: TDF 12/21/2023 PROPOSED Milne Point Unit Well: MP F-10A Last Completed: Future PTD: 223-027 JEWELRY DETAIL No Depth Item 1 ±150’ 3-1/2" x 1" GLM, DV installed 2 ±3,000’ Packer, Reduced ID Viking ESP Retr. Dual Vent 3 ±XX,XXX’ 2-7/8" x 1" GLM, DV installed 4 ±XX,XXX’ 2-7/8” X-nipple with RHC profile 5 ±XX,XXX’ Ported Discharge Head 6 ±XX,XXX’ Pump 7 ±XX,XXX’ Gas Separator 8 ±XX,XXX’ Upper Tandem Seal 9 ±XX,XXX’ Lower Tandem Seal 10 ±XX,XXX’ Motor 11 ±XX,XXX’ Intake Sensor & Centralizer – Btm @ ±16,420’ 12 16,477’ Baker S-3 Packer 13 16,480’ 2-3/8” x 3-1/2” LTP 14 16,535’ 3-1/2” HES XN Nipple (2.75” ID) 15 16,547’ 3-1/2” WLEG WELL INCLINATION DETAIL KOP @ 6,000’ Max Angle is 75 deg. @ 7,500’ TREE & WELLHEAD Tree 3-1/8” 5M FMC Wellhead 11” 5M FMC Gen5A w/ FMC Tbg. Hng. 4.5” ACME Top, 3.5” EUE Btm. CIW H BPV Hanger Landing Threads 4.5” Left Hand ACME20” Orig KB Elev.: 40.75’ / Orig GL Elev.: 12.5’ 7” 4 5 7 8&9 1 3 9-5/8” 2 6 Min ID 2.75” @ 16,535’ 10 11 Whipstock set @ 16,700’ Top of Window @ 16,704’ TD =19,070’(MD) / TD=7,251’(TVD) PBTD =19,050’ (MD) /PBTD=7,255’(TVD) Proposed Tubing Cut @ ±16,450’ 12 14 15 13 OPEN HOLE / CEMENT DETAIL 24” 250 sx Arctic Set (Approx.) 12-1/4” 1590 sx PF E, 1026 sx Class G 8-1/2” 220 sx Class G CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 19.124 Surface 112’ 0.3553 9-5/8" Surface 40 / L-80 / Buttress 8.921” Surface 8,635’ 0.0758 7” Production 26 / L-80 / BTC 6.276” Surface 9,131’ 0.0383 2-3/8” Liner 4.7 / L-80 / Hyd 511 1.995” 16,500’ 18,620’ 0.0039 TUBING DETAIL 3-1/2” Tubing 9.2 / L-80 / NSTC 2.992 Surface ±2,650’ 0.0087 2-7/8” Tubing 6.4 / L-80 / EUE 8rd 2.441 ±2,650’ ±16,420’ 0.0058 3-1/2” Tubing 9.2 / L-80 / NSTC 2.992”±16,450’16,547’ 0.0087 PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup. A1 Sands 17,569’ 18,239’ 7,266’ 7,257’ 670 11/12/2023 Open Perforation Data for 11/12/2023: 1.56” Dia. Guns @ 6spf. GENERAL WELL INFO API: 50-029-22679-00-00 Initial Completion by Polar 1 - 7/3/1996 Sidetracked and Completed by CDR2 – 12/8/2023 Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO Coiled Tubing BOPE Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO Standing Orders for Open Hole Well Control during Perf Gun Deployment Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO Equipment Layout Diagram Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO Double Ram BOPE Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO Triple Ram BOPE Shaffer 11'’-5000 CIW-U 4.30'Hydril GK 11" - 5000 2-7/8" x 5" VBR Blind 11'’- 5000 2 1/16 5M Kill Line Valves 2 1/16 5M Choke Line Valves HCRManualManual Stripping Head ManualManual 2-7/8" x 5" VBR Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 12/21/2023 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20231221 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# MPU B-28 50029235660000 216027 12/6/2023 HALLIBURTON PATCH MPU F-10A 50029226790100 223027 12/7/2023 HALLIBURTON PLUG MPU F-10A 50029226790100 223027 12/7/2023 HALLIBURTON TUBING-PUNCH NCIU A-12B 50883200320200 223053 12/1/2023 HALLIBURTON RBT NCIU A-18 50883201890000 223033 12/4/2023 HALLIBURTON RBT PBU 01-28B 50029215970200 223089 12/13/2023 HALLIBURTON RBT Please include current contact information if different from above. T38238 T38239 T38239 T38240 T38241 T38242 12/22/2023 MPU F-10A 50029226790100 223027 12/7/2023 HALLIBURTON PLUG MPU F-10A 50029226790100 223027 12/7/2023 HALLIBURTON TUBING-PUNCH Kayla Junke Digitally signed by Kayla Junke Date: 2023.12.22 09:09:45 -09'00' By Grace Christianson at 9:27 am, Dec 12, 2023 Completed 11/14/2023 JSB RBDMS JSB 122823 GDSR-1/29/24 Drilling Manager 12/11/23 Monty M Myers Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2023.12.12 08:34:39 - 09'00' Taylor Wellman (2143) _____________________________________________________________________________________ Modified:JNL 11/28/2023 SCHEMATIC Milne Point Unit Well: MP F-10A Last Completed:11/14/2023 PTD:223-027 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 Surface 112’ 9-5/8" Surface 40 / L-80 / Buttress 8.921” Surface 8,635’ 0.0758 7” Production 26 / L-80 / BTC 6.276” Surface 16,704’ 0.0383 2-3/8” Liner 4.7 / L-80 / Hyd 511 1.995” 16,480’ 18,265’ 0.0039 TUBING DETAIL 3-1/2” Tubing 9.2 / L-80 / NSTC 2.867” Surf 16,547’ 0.0087 JEWELRY DETAIL No Depth Item 1 16,413’ Northern Solutions Patch w/ Jet Pump 2 16,415’ Tubing Punch 16,415’ – 16,420’ 3 16,477’ Baker S-3 Packer 4 16,480’ Northern Solutions Liner Top Packer 5 16,535’ 3-1/2” HES XN Nipple (2.75” ID)– milled pre-rig to 2.80” 6 16,547’ 3-1/2” WLEG PERFORATION DETAIL Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD)FT Date Status Size Kuparuk 17,569 18,239 7,266 7,257 670 11/12/2023 Open 1.56” WELL INCLINATION DETAIL KOP @ 16,702’ 90 deg Angle @ 16,810’ REE & WELLHEAD Tree 3-1/8” 5M FMC Wellhead 11” 5M FMC Gen5A w/ FMC Tbg. Hng. 4.5” LH ACME Top, 3.5” EUE Btm. CIW H BPV GENERAL WELL INFO API: 50-029-22679-01-00 Initial Completion by Polar 1 - 7/3/1996 A Sidetrack Completed by CDR2: 11/14/2023 NOTE: Landing Thread on Hanger is 4.5” LEFT HAND ACME OPEN HOLE / CEMENT DETAIL 24” 250 sx Arctic Set (Approx.) 12-1/4” 1590 sx PF E, 1026 sx Class G 8-1/2” 220 sx Class G 3-1/4” 80 sx Class G TD = 18,265’(MD) / TD=7,252’(TVD) 20” Orig KB Elev.: 40.75’ / Orig GL Elev.: 12.5’ 7” 3 1&2 5 9-5/8” PB1: 17,512’ – 17,944’ PBTD =18,248’(MD) /PBTD=7,255’(TVD) Whipstock set @ 16,698’ Top of Window @ 16,702’ 4 6 2-3/8” Top of Liner Top Packer / Cement @ 16,480’ Tubing Punch 16,415’ – 16,420’ Min ID 2.75” @ 16,535’ Milled to 2.80” pre CTD Well Name: MP F-10A API Number: 50-029-22679-01-00 Permit to Drill: 223-027 Spud Date: 10/31/2023 Start Time Operation Released off PBE 04-46A well, Begin Reel swap operations in preperation for move to MPU F-10 Swap BOP rams for 2" coil configuration. Shell test. Blow down all rig surface lines. RD inner reel iron. Un stab coil from injector. Pull back and secure to reel. ND BOP stack and MPD line. Start RDMO checklist. Begin swapping injector gripper blocks to 2". Complete RDMO checklist Stomper Mud module off of well Stomper Sub module off of well Clean up well cellar and location Drop 2-3/8" reel and PU new 20k 2" reel. Secure on rig. Move rig to MPU Make turn on to L-F access road On location. Remove jeeps and spot rig modules over MPU F-10. Accept rig at 19:00 Continue with conversion to 2" coil. Install inner reel iron. Complete change to 2" injector gripper blocks. Swap out 2-3/8" gooseneck and install 2" gooseneck. Dress stripper for 2" coil. NU BOP's Nipple up adapter flange. NU BOPE and MPD line. Install grapple. Pull test. Pull 2" coil across. Take control of pipe with injector Make up CTC, Pull test to 45K. BHI make up UQC without floats. Load reel, 5 bbls Methanol, Freshwater at 0.5 bpm. Replace leaking pack off Pressure test inner reel iron and hose to 7000 psi. Pass Grease all choke, kill and BOP stack. RU to test BOPs Test BOPE to 250/3500 psi per PTD and well program. Test witness waived by Brian Bixby. 7-1/16" 5K Annular, Blind/Shear, 2.0" Pipe/Slip, 2-3/8" Pipe/Slip, 2.0" Pipe/Slip Test 1: IRV, Packo , C7, C9, C10, C11 - Pass Test 2: Blind/Shear, R2, BL2, C15 - Pass Test 3: Annular (2.0") TIW #2, B1, B4 - B1 Fail, grease, Pass Test 4: Upper 2.0" Pipe/Slip, TIW #1, B2, B3 - Pass Test 5: Lower 2" Pipe/Slip, C5, C6, C8, TV2 - Pass Test 6: Choke A, Choke C - Pass Test 7: 2-3/8" Pipe/Slip, C1, C4, TV1 - Pass Test 8: C2, C3 - Pass Accumulator draw down test Rig down test joint and test risers. Install drilling risers Get RKB measurements MU BHA #1 with 2.5" nozzle Stab on well and pump 6.8 bbls methanol followed by 1% KCL Rate: 0.48 bpm in, 0.72 bpm out MW: 8.31 ppg in, 7.9 ppg out Wellhead pressure: 600 psi. PUW 39K / SOW 15K Log CCL from 16430' to 16800' Correct +28' to Western Atlas SBL dated 26-Jun-1996 Finish pumping 1% KCl. Close choke. Verify pore pressure. 3754# (7210' TVD) 10.01 ppg EMW Swap well over to drilling mud with black product Rate: 1.44 bpm in, 1.30 bpm out MW 8.74 ppg in, 8.39 ppg out Pooh w/ BHA#1 Rate: 1.63 bpm in, 1.15 bpm out MW: 8.74 ppg in, 8.42 ppg out. Window depth ECD 10.3 ppg Tag up and close swabs. Lay down BHA#1 10/26/2023 10/27/2023 10/28/2023 10/29/2023 10/30/2023 Page 1 of 10 Pressure deploy BHA#2 Whipstock Pressure test Drillers side PDL to 3000# Bleed down to wellhead pressure. Rih w/ BHA#2 Whipstock Rate: 0.43 bpm in, 0.74 bpm out MW: 8.72 ppg in, 8.77 ppg out Log CCL from 16,500' to 16,800' Log additonal GR from 16,420' to 16,780' Discuss proposed WS setting depth with Drilling Engineer and Drilling Foreman RIH to 16,706.75' bit depth. Pick up to wt back and set TOWS at 16,698' Shut EDC and Set WS. Set 5k down to confirm set. POOH for window milling BHA In Rate = 1.21 bpm , Out Rate = .72 bpm In WT = 8.73 ppg, Out WT = 8.75 ppg ECD at window = 10.9 Tag up, Space out Pressure un-deploy BHA#2 Rih w/ BHA#3 Window Milling Rate: 0.40 bpm in, 0. 64 bpm out MW: 8.73 ppg in, 8.76 ppg out Window ECD 10.5to 11.2 ppg PUW 38K, SOW 13.7K Dry tag whipstock pinchpoint at 16702' MD. Close EDC Iniitate window at 16702.0 MD - Free Spin: 4223 psi @ 1.65 bpm (669 psi Di ) - Rate: 1.75 bpm in, 1.16 bpm out Circ pressure: 4223 psi to 4279 psi - MW: 8.72 ppg in, 8.76 ppg out Window ECD: 11.48 ppg Losing 30 bph - Mill exit at 16706' MD for 4' window - Free Spin: 4223 psi @ 1.65 bpm (669 psi Di ) - Rate: 1.70 bpm in, 1.53 bpm out Circ pressure: 4223 psi to 4403 psi - MW: 8.71 ppg in, 8.77 ppg out Window ECD: 11.49 ppg Losing 10 bph Backream window at as-milled TF Dry drift window clean POOH from 16,702' In Rate = 1.14 bpm, Out Rate = .65 bpm In WT = 8.71 ppg, Out WT = 8.78 ppg ECD at window = 10.43, WHP = 545 PUD BHA #3 - NSAK window milling BHA Mill and reamer both gauge 2.81" Go, 2.80" no go. Jet BOP stack and ush all surface lines. Jet and service choke. Pressur Deploy build BHA #4 with 2.4 deg motor and 3.25" HCC bi-center bit RIH with BHA #4 - In Rate = 1 bpm, Out Rate = 1.33 bpm - In mud wt = 8.72 ppg, Out mud wt = 8.79 ppg - IA = 189, OA = 36 - ECD at window = 10.57 Log tie in from 16450' to 16505.49' for -31' correction. 10/31/2023 Page 2 of 10 Rih to window. Trap pressure. Close EDC. PUW 39K / SOW 12.5K -Free Spin: 4316 psi @ 1.80 bpm ( 594 psi di ) -MW: 8.74 ppg in, 8.78 ppg out - ROP 30-40 fph WOB: 1.7 - 2.2K - Landed build at 16890' MD. Wiper to window. Perform jog. - Pull through window with minimal overpull. - Perform jog in cased hole. Pooh for lateral Rate: 2.05 bpm in, 1.63 bpm out MW: 8.75 ppg in, 8.80 ppg out Window ECD 11.8 ppg Pressure undeploy BHA#4. Maintain 11.8 ppg ECD at window Bit 2-1. Make up BHA#5 with agitator and New 3.25" HYC bit. Pressure deploy BHA. RIH with BHA #5 - Shallow hole test agitator. Good Test. -Rate: 0.62 bpm in, 0.94 bpm out - MW: 8.75 ppg in, 8.83 ppg out Window ECD: 11.8 ppg - Tie in depth from 16450' correct -32.5' - Close EDC Drill 3.25" lateral from 16890' - Mud Wt 8.71 / 8.79 ppg In / Out 1.75 / 1.61 bpm Pcirc 4600 - 4850 psi Window ECD 11.71# w/ 20 psi WHP 16950' 5 bbls lo/hi vis 150' wiper from 17040' clean up/down 45k/9k Drill 3.25" lateral from 17040' - Mud Wt 8.62 / 8.88 ppg In / Out 1.89 / 1.60 bpm Pcirc 4800 - 5480 psi Window ECD 11.73# w/ open choke 17100' 5 bbls lo/hi vis 17116' BHA wiper clean up/down ECD climbing. Wiper trip to window from 17125' Clean pass to window, jog then pull through. Jog above window open EDC. Jet tray and 7" csg 2.2 / 1.5 bpm 4900 psi ECD = 12.27# 16570' 5 bbls lo/hi vis circ until returns clean up. Tie-in depth correct +6' Close EDC. Pass window RIH to bottom Drill 3.25" lateral from 17125' - Mud Wt 8.85 / 8.94 ppg In / Out 1.81 / 1.51 bpm Pcirc 4750 - 5030 psi Window ECD 11.88# w/ open choke 17225' 5 bbls lo/hi vis 17226' BHA wiper clean up/down Drilling ahead from 17226' to 17600' MD Rate: 1.80 bpm in, 1.63 bpm out MW: 8.86 ppg in , 8.96 ppg out Window ECD: 12.07 ppg ROP: Control drill at 60 fph, 0.8K- 1,2K WOB BHA wipers as hole dictates. 11/01/2023 Page 3 of 10 Long wiper from 17598' to window. Rate: 1.80 bpm in, 1.63 bpm out. MW: 8.87 ppg in, 8.97 ppg out. Window ECD 12.03 ppg Rih while maintaining toolface to 16800' MD. Pulled -7.7K on window, Rih and stack +5K. Pickup again and popped free. Increase rate and wash up tubing tail. Jog. Open EDC. Jet up into tubing . Jet up into tubing tail. - Log RA on depth. Jet tray. Pull up to 16716'. Close EDC. - Increase rate once out of build. Drill ahead in lateral from 17598' MD. -Free spin: 4907 psi @ 1.80 bpm (902 psi Di ) -Rate: 1.80 bpm in, 1.61 bpm out -MW: 8.87 ppg in, 8.90 ppg out Window ECD: 11.8-12.0 ppg -ROP: 45-60 fph. WOB 0.8K to 1.4K 17690' BHA wiper 17690', 17770' 5 bbl lo/hi vis 150' wiper from 17779' clean up/down 46k/8k Drill 3.25" lateral from 17779' 1.82 / 1.60 bpm In / Out 8.88 / 8.99 ppg Window ECD = 12.1# on open choke Pcirc 5000 - 5190 psi 17807' BHA wiper clean up/down 17825' 5 bbls lo/hi vis 150' wiper from 17900' clean up/down 46k/7k Drill 3.25" lateral from 17900' 1.80 / 1.65 bpm In / Out 8.85 / 8.98 ppg Window ECD = 12.07# on open choke Pcirc 5000 - 5250 psi 160' wiper from 17917' clean Wt transfer poor pull 300' wiper pump 5 bbls lo/hi vis Pull long wiper to window from 17925' Jog below sump and pull through minor drag. Motor work, -4k DWOB just below window, RIH then pull through see -2.5k DWOB in one spot Open EDC, wash whipstock tray and pulll through 500' jog at surface. Close EDC and test agitator. Not working. Tag up Pressure Un-deploy BHA#5 Swap agitator, motor, bit Pressure deploy BHA#6. Shallow test agitator. Good test. Rih with BHA#6 -Rate: 0.53 bpm in, 0.91 bpm out -MW: 8.85 ppg in, 8.89 ppg out Window ECD: 11.85 ppg - Run through window without issue - Pushed 1-2.5K at 16,740' to 16,888' MD - Clean run from there to 17687' MD. Hard tag. Start packing o . -Wipe up to base of build 16890' MD 11/02/2023 Page 4 of 10 - Work way back down to 17680' MD - Pulling speed maintained at 5 fpm to keep packo s to a minimum. - Multiple 5 bbl LoVis / 10 bbls HiVis sweeps pumped. Jog below window, pull through jog above window. Try to jet tray, stack 16728' close EDC and wash down. Open EDC and clean 7" into tubing. Cycle pipe and pump, break loose pump 5 bbls lo/hi vis try again, pull into TT clean. Pump sweeps to surface, tie-in depth correct +5'. Close EDC, pass window clean go to 0.3 bpm in build. 17200' go to full rate pull 100' wiper trip to check sump and build, ECD ok. Continue RIH. Pump 5 bbls lo/hi vis RIH stack wt 17661', 17669' Wiper from 17800' to 17600' PU wt and ECD ok. Short wiper at 17850' is ok. Drill 3.25" lateral from 17925' 1.83 / 1.72 bpm In / Out 8.80 / 8.87 ppg Pcirc 5350 - 5530 psi Window ECD 12.00 ppg open choke PU after few ft drilled is ok continue drilling. At 17942' Pann +250 psi, pull wiper to 17600'. Motor work, overpull at 17655' PU until Pann breaks back, continue wiperr trip to window. Wiper to window 16790' motor work, overpull. Cycle pipe and pump to break loose, RIH then pull through. RIH back to 17600' then wiper to window. Wiper trip to window. Pull through sump and build 10 ft/min motor work again at 16790' Jog above window, open EDC. Pump sweeps up. Close EDC. Run through window at 0.2 bpm. 16788' and 16889' tag and go by. Run to 17000' clean Pull up through build at min rate. No issues. Pull up through build and window. Jog in casing. Pooh while spinning bit to clean low side of pipe. Pooh with BHA#6 - Rate: 1.74 bpm in, 1.21 bpm out Circ pressure: 4783 psi - MW: 8.80 ppg in, 8.84 ppg out Window ECD: 11.80 ppg - Perform jog at 2000' MD. Verify agitator working. Stop Open EDC - Increase rate to 2.2 bpm in , 1.71 bpm out Tag up. Space out. Put well on MPD with 11.8 ppg ECD. Pressure un-deploy BHA#6. Check bit. Stand back. Make up and pressure deploy anchor billet assembly. Ran 2.72" Gauge over assembly. 11/03/2023 11/04/2023 Page 5 of 10 Rih with BHA#7 Anchor Billet -Rate: 0.63 bpm in, 0.88bpm out -MW: 8.81 ppg in, 8.86 ppg out Window ECD: 11.85 ppg - Close EDC. Run through window without issue. Start taking weight at 16750' MD. - PU start rolling orienter. No drag. Appears to be upper BHA. Steady push. Started moving freely at 17771'. Rih to depth. PUW 41K. Rih to set depth of 17521.75' Top of billet 17510' MD. PU to 2K shy of breakover. Pressure up. Good indication on shear out and taking weight. Stack 5K. Pooh POOH w/ BHA #7 - Billet Set Keep 11.8# at window. Tag up, space out Break down and offload BTT tools. Inspect 20' of CT, good. Pressure deploy BHA #8 - Lateral Drilling RIH BHA #8 Keep 11.8# ECD at window Tie-in depth from 16430' correct -16.5' Close EDC, pass window no issues RIH min rate to billet. Min rate tag billet at 17512' PU go to 1.8 bpm Ease down engage billet 17510.8' Sidetrack off billet 1 ft/hr then 2 ft/hr for 2 ft. O billet Drill 3.25" lateral from 17515' 1.78 / 1.69 bpm In / Out 8.82 / 8.84 ppg Window ECD 11.88# open choke 17530' 5 bbls lo/hi vis 17550' short wiper past billet is clean. Drilled ahead from 17550' MD Free spin: 5245 psi @ 1.88 bpm (1222 psi di ) Rate: 1.88 bpm in, 1.67 bpm out MW: 8.82 ppg in, 8.92 ppg out. Window ECD 11.8 ppg PU off bottom at 17700' Parameter drastically changed. Drilled from 17700' Free Spin: 4430 psi @ 1.80 bpm Rate: 1.83 bpm in, 1.40 bpm out Continue drilling ahed to 17850'. Wiper trip to window. Jog below billet and pull by at min rate. Jog just below build. Pull up to window. Drop rate. Pull though without issue. Close EDC. Run though window without issue. Minor bobbles going through build. Run past billet without issue. Drilled ahead from 17850' MD Free spin: 3094 psi @ 1.82 bpm (404 psi di ) Rate: 1.82 bpm in, 0.88 bpm out 57 bph loss rate. MW: 8.81 ppg in, 8.86 ppg out. Window ECD 11.65 ppg Pump bleeder P-11. Leaking by. Source valve. Remove bleeder valve to service install cap. Pump 5 bbls lo/hi vis when past billet. 11/05/2023 Page 6 of 10 Drill 3.25" lateral from 17880' 1.86 / 1.57 bpm In / Out 8.78 / 8.85 ppg Window ECD 11.93 ppg open choke 17936' 5 bbls lo/hi vis 17939' Pann erratic, pull 200' wiper trip. Drill 3.25" lateral from 17939' 1.81 / 1.56 bpm In / Out 8.80 / 8.86 ppg 18046' pull 200' wiper clean up/down Drill 3.25" lateral from 18046' 1.86 / 1.47 bpm In / Out 8.79 / 8.88 ppg Window ECD 12.32# on open choke Wiper to window pump 5 bbls lo/hi vis Pann steady climb, +140 psi in last 120' Jog below billet and pull past clean Jog below window pull through, hang up cycle pipe and pull past. Jog above window, open EDC. Tie-in depth correct +6' Close EDC, RIH to bottom. Drill 3.25" lateral from 18054' 1.86 / 1.57 bpm In / Out 8.79 / 8.81 ppg Window ECD 12.32# on open choke 150' wiper from 18075' is clean Drilled ahead from 18133' MD to 18273' MD Free spin: 5476 psi @ 1.82 bpm (1161 psi di ) Rate: 1.82 bpm in, 1.55 bpm out 12-18 bph MW: 8.79 ppg in, 8.85 ppg out. Window ECD 12.3 ppg Short wiper Geo wiper to decide plan forward. Drilled ahead from 18260' MD to 18273' ROP slowed to 19 fph. Appears we are drilling shale. Geology called TD - Rate: 1.83 bpm in, 1.57 bpm out. - MW: 8.79 ppg in, 8.85 ppg out - Pull to 16890' MD. Jog in hole 200'. Pull up to base of build. Drop to min rate. - Tag at 16848'. PU Increase rate to 0.75 bpm. Go by. Head to bottom to correct TD. Tagged at 18265'MD. Sticky coming off bottom. Call this corrected TD. Wiper trip to surface Rate: 1.80 bpm in, 1.60 bpm out MW: 8.79 ppg in, 8.79 ppg out Pump multiple sweeps. Jog through build. Bobble. Had to work through window again. Tag stripper, reset depth, RIH Tie-in depth from 16430' correct -40'. Close EDC, RIH through window. RIH lay in beaded liner pill from 18150' to 16680' Circulate 11.9 ppg KWF around. 10 min ow check. Well Dead. Pooh Paint yellow ag 16378.44 (16300.1' EOP) Paint white flag 14778.31 (14699.97' EOP) 11/06/2023 Page 7 of 10 Pooh -Rate: 0.80 bpm in, 0.28 bpm out - MW: 11.87 ppg in, 12.02 ppg out - Perfom 10 min ow check. Well dead. - Lay down BHA#8. Clean and clear rig floor. Prep rig floor for liner run. Make up shoe track and ORCA assembly. Run 2-3/8" L-80 Liner. Filling every 10 joints Make up per tally. Make up MWD . Stab injector. Rih with liner Rate: 0.52 bpm in, 0.5 bpm out MW: 11.90 ppg in, 11.92 ppg out. Start mud down CT Stop at rst ag correct -23.6'. Continue swap well to mud. Well swapped to mud, RIH with liner. Clean through window, stack wt 16834' PU 39k Try various running speeds and pump,nally work past. Land liner on bottom 18256' pick up and repeat, same depth Stack 7k on liner go to 1 bpm to release GS. PU new up wt 5k less, DWOB 2.6k di erence. PU to logging depth, correct +8'. Latch into liner 18265' PU o liner, open EDC swap well to KWF. Good 10 min no-flow on bottom about 7 bbl/hr loss rate after 10 min. POOH 1.01 / 0.56 bpm In / Out 11.84 / 11.94 ppg At surface, good 10 min no-ow Skid back L/D BHA #9 Remove UQC. Cut o CT connector and 20' of CT for wear spot. Dress CT and install connector. Pull test 50k, good PT 4000 psi, good. Pump 197' of slack out. Install cable boot. Recovered Ball, Inpsect Top Drive then prep to PU the CMT BHA MU CMT BHA w/ 1" CSH String RU head pin and pump every 20 jts RU to flush each joint before PU Drift still getting stuck, cut a length of Eline , unravel one end and drag through each joint in the PS RU Head Pin and circ first 20 jts in the well then continue runing CSH. Drift still hanging up at the pin end. Largest ball size we will pump is 5/8", drift 1" CSH with 3/4" Ball on Rod, passed through with no issues 40 jts ran, RU head pin and circulate 1" 60 jts ran circ through 0.5 bpm / 680 psi M/U swivel and injector. Pump B/U from surface to clear the string. RIH Milne Point Field at Phase 3 weather conditions. Shut down operations, limit work to just walkarounds. Contnue Phase 3 WOW 6.3 bph loss rate 365 bbls of KWF in the pits 11/07/2023 11/08/2023 Page 8 of 10 Keep hole full w/ 6 bbl/hr loss rate. Move CT periodically. GPB went to Phase 2 at 04:20 Keep hole full w/ 6 bbl/hr loss rate. Move CT periodically. Milne Point is now at Phase 2, we have been given the ok to start easing back into or normal operations RIH Stop at liner top ag and correct -6.6' RIH Pass liner top no issues At 16680' wt is 39k/14k 0.55 / 0.5 bpm 1500 psi 1.0 / 0.55 bpm 3600 psi Swap well to KCl With KCl in well use MPD choke to maintain 11.2# ECD = 1000 psi WHP 1.5 bpm @ 17150' = 3450 psi RIH to 50' above ORCA 40k/10k CT wt 1.5 bpm = 3800 psi New pressure 1.5 bpm = 4560 psi Circ 0.8 bpm / 2800 psi w/ 1100 psi WHP 6 bbl/hr loss HES cement crew R/U. Some heavy returns on B/U after sting into ORCA. Pump 17.2 bbls liner cement job as per plan Continue with Liner CMT Job. 51.8 bbls away take returns to gauge pit and zero the out MM Circ pressure dropping off, shut down pump at 16.0 bbls pumped~ 0.2 bbls early, PU out of the ORCA Valve, displace last bbl with Exhaust Pill. Clean out down to 18238' (10' above the valve) then POOH to TOL Getting excess CMT back at volume. Recip the TOL. Got back ~30 bbls of contaminated CMT RIH to 16825' while circulating a bottoms up Start KWF down the coil to swap well to KWF from 16825' to surface, flow check then POOH Well swapped to KWF, returns are almost 100%. Shut dowm pumps and flow check well. Good no flow but losing ~4-5 bph. POOH OOH ow check well, good no ow PU the injector and install the Side Jet Nozzle in the BHA to flush the BOP's before LD the BHA LD CMT BHA Well on slight losses L/D ORCA stinger, everything recovered. Clean and clear rig oor Load perf guns and running equipment onto rig. M/U 32 Perf guns as per memo M/U 38 jts 1" CSH w/ marker pup M/U swivel and injector. Pump B/U volume at surface to clear the string. Set pump trips close. RIH Correct at ag -40.7' Get up wt + 1' drop 7/16" ball to activate firing head. Tag at 18242' ~6' shallow, confirm with DE ok to shoot 6' shallower. We are good to shoot. Bottom shot will be at 18241'. Load 7/16" Ball in reel, launch and increase WHP to 200 psi. Circulating 7/16" Ball to fire guns. No ball on seat at volume. Pumped 2 volumes and no ball. Shut down pumps, PU and spud it on bottom, PU get back on depth and pump Pumped 2.5+ volumes with no ball on seat. Load 2nd 7/16" Ball and launch on the fly No ball on seat at volume, start walking rate up watching for a pressure spike, WT Change or loss of returns. Increase rate to 1.25 bpm at 11/09/2023 11/10/2023 11/11/2023 Page 9 of 10 200', RIH with 50psi WHP tag PU to bottom shot depth and come back online with pumps. Prep to pump High Vis Pill next Ball landed on seat, guns fired lost returns and WHP then both came back, POOH to TOL and flow check well Above the TOL, bleed o WHP and ow check well. Good no ow, POOH Tag up, shut down pumps and RIH to 1250'. Online with pumps to circ perf gun gas out while POOH OOH,ow check well, good no ow, LD Perf BHA Fill every 20 min 6 bbls/hr loss rate. Pull up to ring head, shots red. Recover 2 balls that were dropped. L/D 32 guns, all shots red Perforated Interval: 17569' - 18239' Clean and clear rig oor, o oad perf equipment. M/U nozzle BHA w/ DFCV. RIH w/ BHA #12 - Nozzle w/ DFCV At 900' depths counters o , P/U and clean para n o . Start KCl down CT Tag liner top, correct depth. P/U o liner top, change out depth encoder. POOH Freeze protect from 2800' with diesel but build back up after closing the choke. It appears that we have excess eline across the valves keeping the valves from closing We will have to RIH and displace the well back over to KWF to come out and cut the excess wire off and put a nozzle on that does not have a hole on the bottom. Stop at 16350, 150' above the TOL as to not damage the eline by tagging the TOL. Had to build more KWF, WO KWF truck coming from MI Mud Plant Online with KWF down the coil. KWF at the nozzle, pump 2 bbls out then close choke and Bullhead 4 bbls to cover volume to just below the TOL then displace well to KWF. KWF to surface, shut down pumps and flow check well. Good no flow, POOH At surface, good 10 min no-ow. Check SV, MV close 18 turns. Break o BHA to nd cable, is at the CT connector. Check cable, no boot doesn't test possible uid invasion. Boot cable, change out nozzle. PT swab, master good. RIH BHA #13 - Freeze protect nozzle w/ DFCV Chase 40 bbl diesel w/ fresh water followed by inhibitor. POOH freeze protect from 2800' Clean diesel at Out MM close choke POOH pump pipe displacement. Tag up close MV, SSV 550 psi on well Bleed off. Cut 205' of CT + cable then test cable, good test Boot cable, install grapple prep to pull CT out of injector. Install Grapple to Coil, unstab coil from the injector and secure at the reel. LTT Master & Swab Valves to 3720psi, good PT well is secured. Remove Washpipe from inner reel and cap the hardline left in the reel. Grease HP Valves and BOP Stack Valves. Remove all Hilcorp Crossovers , Safety & Test JOints and 1" CSH to be sent off for inspection Install tree cap pump MeOH through wing and out tree cap. Shut in PT cap 3500 good. Release rig 20:00 11/13/2023 11/14/2023 11/12/2023 Page 10 of 10 ACTIVITYDATE SUMMARY 11/23/2023 Well Support Techs set foundation, installed test and prodcution lines to header, pressure tested production lines to1150 psi. Support techs R/U hardline for power fluid supply, pressure tested line to 3650 psi. Support techs set well house. 11/28/2023 ***WELL S/I ON ARRIVAL*** RAN 3-1/2 DUMMY LTP w/ 1/8'' BRASS TATTLE TALE PIN, TAG @ 16560' SLM, (recover cup of metal shavings)(pins not sheared) RAN 2.73'' CENT., 10' X 1-3/4'' BAILER (flapper), TAG & WORK BAILER @ 16572' SLM, (no recovery, ring on bottom of cent.) WELL S/I ON DEPARTURE ***CONTINUE WSR ON 11-29-23*** 11/29/2023 Assist SLickline, Pumped 30 bbls Source Water down Tubing, Pumped 30 bbls Diesel down Tubing 11/29/2023 ***CONTINUE WSR FROM 11-28-23*** WELL S/I ON ARRIVAL RAN 3.5 BLB, 5' X 1-1/2'' STEM, 2.375 BLB, GET LRS TO PUMP 60 bbls WHILE WORKING DEPLOMENT SLEEVE @ 16562' SLM RAN 2.25'' LTP DRIFT w/ 1/8'' BRASS TATTLE TALE TAG @ 16562' SLM (one cup metal shavings in drift, two brass pins sheared) RAN 2.72 CENT., 10' X 1-3/4'' BAILER (flapper), TAG AND WORK BAILER @ 16572' SLM (no recovery, ring on cent.) RAN 2.25'' LTP DRIFT w/ 1/8'' BRASS TATTLE TALE TAG @ 16562' SLM (1 brass pin sheared) WELL S/I ON DEPARTURE ***CONTINUE WSR ON 11-30-23*** 12/2/2023 Wellhead- Wel shut-in on arrival Pre-rig packoff test, Pressured packoff 500/3000 psi for 10 mins all tests good. RDMO T-0 I/A-0 O/A-0 12/3/2023 *** WELL SHUT-IN ON ARRIVAL.*** TAG DEPLOYMENT SLEEVE AT 16,480' MD W/ 2.75" LIB (Impression of f/n). TAG DEPLOYMENT SLEEVE AT 16,480' MD W/ 2.75" CENT, 10' x 1-3/4" BAILER (no recovery, metal ring on cent). TAG DEPLOYMENT SLEEVE AT 16,480' MD W/ 2.25" LTP DRIFT. (sheared 2 pins). *** CONTINUE WSR ON 12-4-23.*** 12/4/2023 *** CONTINUE WSR FROM 12-3-23.*** PUMP 4bbls DIESEL W/ TRI-PLEX AT .25bpm (tubing pressured up to 1200psi) TAG DEPLOYMENT SLEEVE AT 16,480' MD W/ 2.75" CENT, EXTENSIONS, 2.20" GAUGE RING(metal ring on cent). TAG DEPLOYMENT SLEEVE AT 16,480' MD W/ 2.25" LTP DRIFT(sheared bottom 3 pins) NO METAL RING. *** CONTINUE WSR ON 12-5-23.*** Daily Report of Well Operations PBU MPF-10A Daily Report of Well Operations PBU MPF-10A 12/5/2023 *** CONTINUE WSR FROM 12-4-23.*** LRS ASSISTED W/ FLUSH OG TUBING W/ 50bbls DIESEL. TAG DEPLOYMENT SLEEVE @ 16,480' MD W/ 2.75" CENT, 3-1/2" BLB, 1.75" CENT (metal ring on cent). TAG DEPLOYMENT SLEEVE @ 16,480' MD W/ 2.25" LTP DRIFT (all pins sheared, metal ring). LRS ASSISTED W/ FLUSH OG TUBING W/ 50bbls DIESEL. TAG DEPLOYMENT SLEEVE @ 16,480' MD W/ 2.75" CENT, 3-1/2" BLB, 1.75" CENT (metal ring on cent). *** CONTINUE WSR ON 12-6-23.*** 12/5/2023 T/I/O=875/32/0 Assist Slickline (RWO) Pumped 50 bbls diesel down TBG while SL brushed. Final Whps=1500/15/0 12/5/2023 T/I/O=560/40/0 Assist Slickline (RWO) Pumped 50 bbls diesel down TBG while Slickline brushed. Established injectivity of 1 bpm @ 2011 psi. Final Whps=1206/30/5 12/6/2023 *** CONTINUE WSR FROM 12-5-23.*** SET NORTHERN SOLUTIONS LTP IN DEPLOYMENT SLEEVE AT 16,480' MD PERFORMED SUCCESSFUL PRESSURE TEST TO 1000psi W/ TRI-PLEX. PULL 2-3/8" R-PLUG FROM LTP AT 16,480' MD. *** WELL SHUT-IN ON DEPARTURE, PAD OP NOTIFIED.*** 12/7/2023 ***WELL S/I UPON ARRIVAL*** TUBING PUNCH 16415' TO 16420' WITH 5' OF 1.56" CHARGES 4SPF 0 DEG PHASED SET NORTHER SOLUTIONS MONO-PAK AT COE 16423' ***CONTINUED ON 8-DEC-23 WSR*** 12/8/2023 ***CONTINUED FROM 7-DEC-23 WSR*** RDMO HES ***WELL S/I*** UPON DEPARTURE 12/8/2023 *** WELL SHUT-IN ON ARRIVAL.*** SET NS UPPER PACKER W/ JETPUMP (12B,sidoti seal) IN LOWER ACHOR AT 16,478' SLM. SUCCESSFUL TEST ON SIDOTI SEAL (See log). *** WELL SHUT-IN ON DEPARTURE, PAD OP NOTIFIED.*** WELL NAME Date : Shoe @ :FC @ :Top Liner @ : Type: Type : Type : Type : Type : N/A Yes N/A No Yes X No Yes X No X Yes No X Yes No Date : Volume lost during displacement (bbls) : Density (ppg) : 8.4 Volume pumped (bbls) : 290 CEMENT REPORT 11-Nov-23 Hole Size :3.25 Casing Size :3.25 Lead Slurry Class G Volume (bbls): 17.2 15.3 Yield : 1.240 Sacks : 77.9 Mixing / Pumping Rate (bpm) : 1.5 Density (ppg) : Tail Slurry Volume (bbls) : Density (ppg) : Yield : Sacks : Mixing / Pumping Rate (bpm) : Post Flush (Spacer) 1.5 ppb Geovis Density (ppg) : 8.4 Rate (bpm) : Bump press : Volume : 200 Displacement : 1.5 ppb Geovis Density (ppg) : 8.4 Rate (bpm) : 1.5 Volume (actual / calculated) : 16.2/16.2 1.5 Method Used To Determine TOC : Calculated Casing Rotated? Reciprocated? % Returns during job : 100% Cement returns to surface? Spacer returns? Vol to Sur : 30 bbls FCP (psi) : 4680 Pump used for disp : GD Plug Bumped? Cement In Place At : 06:30 11/11/2023 Estimated TOC : TOL - Remarks: FI R S T S T A G E 18265 18248 16480 Preflush (Spacer) 1% KCl Vert Uncert 1sd [ft] 0.00 0.00 Start MD End MD Survey Date [ft] [ft] 28.25 8100.00 10/23/2023 8100.00 16679.83 10/23/2023 16679.83 17485.45 11/5/2023 17485.45 18265.00 11/7/2023 MD Inclination Azimuth TVD TVDSS North East Grid East Grid North Latitude Longitude DLS Toolface Build Rate Turn Rate Vert Sect Major Semi Minor Semi Vert Semi Minor Azim Comments [ft] [°] [°] [ft] [ft] [ft] [ft] [US ft] [US ft] [°/100ft] [°] [°/100ft] [°/100ft] [ft] [ft] [ft] [ft] [°] 0.00 0.00 54.71 0.00 -40.75 0.00 0.00 541709.47 6035275.21 70°30'26.2499"N 149°39'31.5054"W 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.25 0.00 54.71 28.25 -12.50 0.00 0.00 541709.47 6035275.21 70°30'26.2499"N 149°39'31.5054"W 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.05 54.71 100.00 59.25 0.02 0.03 541709.50 6035275.23 70°30'26.2501"N 149°39'31.5046"W 0.07 -106.296 0.07 0.00 0.02 0.20 0.16 1.32 144.71 200.00 0.06 1.53 200.00 159.25 0.10 0.06 541709.53 6035275.31 70°30'26.2508"N 149°39'31.5035"W 0.05 -93.237 0.01 -53.18 0.11 0.51 0.42 1.33 308.73 300.00 0.08 316.78 300.00 259.25 0.20 0.02 541709.49 6035275.41 70°30'26.2518"N 149°39'31.5049"W 0.06 -81.052 0.02 -44.75 0.20 0.80 0.68 1.36 286.15 400.00 0.15 267.52 400.00 359.25 0.24 -0.16 541709.31 6035275.45 70°30'26.2523"N 149°39'31.5102"W 0.12 -16.899 0.07 -49.26 0.21 1.06 0.94 1.40 263.53 500.00 0.39 257.04 500.00 459.25 0.16 -0.62 541708.84 6035275.37 70°30'26.2515"N 149°39'31.5238"W 0.24 35.834 0.24 -10.48 0.05 1.31 1.20 1.44 239.96 600.00 1.28 282.60 599.99 559.24 0.33 -2.05 541707.42 6035275.53 70°30'26.2531"N 149°39'31.5656"W 0.94 24.666 0.89 25.56 -0.03 1.62 1.48 1.50 220.91 650.00 1.89 290.85 649.97 609.22 0.74 -3.36 541706.10 6035275.94 70°30'26.2572"N 149°39'31.6044"W 1.30 17.939 1.22 16.50 0.15 1.80 1.62 1.53 216.12 700.00 2.70 296.34 699.93 659.18 1.56 -5.19 541704.27 6035276.74 70°30'26.2652"N 149°39'31.6582"W 1.68 28.525 1.62 10.98 0.64 1.96 1.75 1.56 214.73 750.00 3.46 302.99 749.85 709.10 2.90 -7.51 541701.95 6035278.07 70°30'26.2785"N 149°39'31.7265"W 1.68 11.167 1.52 13.30 1.56 2.13 1.89 1.59 214.29 800.00 3.72 303.78 799.76 759.01 4.63 -10.12 541699.32 6035279.78 70°30'26.2954"N 149°39'31.8035"W 0.53 30.279 0.52 1.58 2.80 2.30 2.02 1.63 214.48 850.00 4.26 307.94 849.64 808.89 6.67 -12.94 541696.50 6035281.81 70°30'26.3155"N 149°39'31.8863"W 1.22 14.022 1.08 8.32 4.32 2.46 2.15 1.67 34.82 900.00 5.33 310.80 899.46 858.71 9.33 -16.16 541693.26 6035284.45 70°30'26.3417"N 149°39'31.9812"W 2.19 18.463 2.14 5.72 6.38 2.63 2.28 1.70 35.41 950.00 7.27 315.85 949.16 908.41 13.12 -20.12 541689.28 6035288.21 70°30'26.3789"N 149°39'32.0979"W 4.03 6.945 3.88 10.10 9.43 2.81 2.42 1.74 36.53 1000.00 8.44 316.82 998.69 957.94 18.06 -24.83 541684.54 6035293.13 70°30'26.4275"N 149°39'32.2368"W 2.35 1.939 2.34 1.94 13.48 3.01 2.56 1.79 37.96 1050.00 10.16 317.15 1048.03 1007.28 23.97 -30.35 541678.99 6035299.01 70°30'26.4857"N 149°39'32.3991"W 3.44 -6.878 3.44 0.66 18.34 3.19 2.69 1.83 38.82 1100.00 11.12 316.55 1097.17 1056.42 30.71 -36.66 541672.64 6035305.71 70°30'26.5519"N 149°39'32.5850"W 1.93 10.448 1.92 -1.20 23.88 3.37 2.83 1.88 39.61 1150.00 11.94 317.28 1146.16 1105.41 38.01 -43.49 541665.78 6035312.97 70°30'26.6237"N 149°39'32.7860"W 1.67 26.728 1.64 1.46 29.88 3.53 2.97 1.92 39.97 1200.00 12.64 318.88 1195.01 1154.26 45.93 -50.59 541658.63 6035320.85 70°30'26.7016"N 149°39'32.9953"W 1.56 0.863 1.40 3.20 36.45 3.69 3.11 1.97 40.28 1250.00 13.41 318.93 1243.72 1202.97 54.42 -58.00 541651.17 6035329.30 70°30'26.7851"N 149°39'33.2135"W 1.54 7.378 1.54 0.10 43.52 3.85 3.25 2.02 40.56 1300.00 14.41 319.45 1292.26 1251.51 63.52 -65.85 541643.27 6035338.35 70°30'26.8746"N 149°39'33.4448"W 2.02 2.117 2.00 1.04 51.12 4.01 3.40 2.07 40.83 1350.00 15.73 319.63 1340.54 1299.79 73.41 -74.29 541634.78 6035348.20 70°30'26.9719"N 149°39'33.6932"W 2.64 4.138 2.64 0.36 59.40 4.17 3.55 2.12 41.13 1400.00 17.52 320.06 1388.44 1347.69 84.35 -83.51 541625.50 6035359.08 70°30'27.0794"N 149°39'33.9648"W 3.59 -26.836 3.58 0.86 68.56 4.34 3.70 2.18 41.47 1450.00 17.78 319.63 1436.09 1395.34 95.93 -93.29 541615.66 6035370.61 70°30'27.1934"N 149°39'34.2527"W 0.58 81.938 0.52 -0.86 78.28 4.51 3.86 2.24 41.77 1500.00 17.80 320.08 1483.70 1442.95 107.61 -103.14 541605.74 6035382.23 70°30'27.3082"N 149°39'34.5428"W 0.28 -7.789 0.04 0.90 88.07 4.66 4.01 2.30 41.76 1550.00 18.74 319.68 1531.18 1490.43 119.60 -113.24 541595.57 6035394.16 70°30'27.4261"N 149°39'34.8403"W 1.90 2.036 1.88 -0.80 98.12 4.81 4.17 2.36 41.73 1600.00 19.99 319.81 1578.35 1537.60 132.25 -123.95 541584.79 6035406.75 70°30'27.5505"N 149°39'35.1558"W 2.50 2.971 2.50 0.26 108.72 4.97 4.34 2.42 41.73 1650.00 21.10 319.97 1625.17 1584.42 145.67 -135.25 541573.41 6035420.10 70°30'27.6825"N 149°39'35.4887"W 2.22 11.933 2.22 0.32 119.97 5.13 4.51 2.48 41.71 1700.00 22.40 320.69 1671.61 1630.86 159.93 -147.08 541561.51 6035434.30 70°30'27.8228"N 149°39'35.8370"W 2.65 12.577 2.60 1.44 131.96 5.29 4.68 2.55 41.59 1750.00 23.25 321.17 1717.69 1676.94 174.99 -159.30 541549.20 6035449.29 70°30'27.9709"N 149°39'36.1970"W 1.74 -18.292 1.70 0.96 144.67 5.44 4.86 2.62 41.38 1800.00 23.80 320.72 1763.54 1722.79 190.49 -171.88 541536.54 6035464.71 70°30'28.1233"N 149°39'36.5674"W 1.16 14.834 1.10 -0.90 157.75 5.59 5.04 2.69 40.98 1850.00 24.25 321.01 1809.21 1768.46 206.28 -184.72 541523.61 6035480.43 70°30'28.2786"N 149°39'36.9457"W 0.93 -108.735 0.90 0.58 171.07 5.74 5.23 2.76 40.42 1900.00 24.18 320.50 1854.81 1814.06 222.16 -197.70 541510.55 6035496.24 70°30'28.4347"N 149°39'37.3279"W 0.44 6.682 -0.14 -1.02 184.46 5.89 5.41 2.83 39.69 1950.00 25.62 320.89 1900.16 1859.41 238.45 -211.03 541497.12 6035512.45 70°30'28.5950"N 149°39'37.7206"W 2.90 -2.495 2.88 0.78 198.18 6.04 5.61 2.90 38.77 2000.00 27.53 320.71 1944.87 1904.12 255.78 -225.17 541482.89 6035529.70 70°30'28.7654"N 149°39'38.1370"W 3.82 3.251 3.82 -0.36 212.80 6.19 5.80 2.98 37.74 2050.00 29.07 320.89 1988.89 1948.14 274.15 -240.15 541467.81 6035547.98 70°30'28.9461"N 149°39'38.5782"W 3.08 -5.73 3.08 0.36 228.29 6.35 6.01 3.07 36.27 2100.00 30.86 320.54 2032.21 1991.46 293.48 -255.96 541451.89 6035567.22 70°30'29.1361"N 149°39'39.0439"W 3.60 0.456 3.58 -0.70 244.58 6.51 6.22 3.15 33.64 2150.00 32.91 320.57 2074.66 2033.91 313.88 -272.74 541435.00 6035587.52 70°30'29.3367"N 149°39'39.5381"W 4.10 1.417 4.10 0.06 261.75 6.66 6.43 3.25 29.22 2200.00 33.81 320.61 2116.42 2075.67 335.12 -290.20 541417.42 6035608.66 70°30'29.5456"N 149°39'40.0522"W 1.80 14.845 1.80 0.08 279.64 6.82 6.64 3.34 20.82 2250.00 35.80 321.51 2157.48 2116.73 357.32 -308.13 541399.37 6035630.76 70°30'29.7639"N 149°39'40.5804"W 4.11 -24.548 3.98 1.80 298.38 7.00 6.84 3.43 4.16 2300.00 37.03 320.58 2197.71 2156.96 380.40 -326.79 541380.58 6035653.73 70°30'29.9909"N 149°39'41.1301"W 2.70 1.845 2.46 -1.86 317.87 7.20 7.02 3.54 347.25 2350.00 38.78 320.67 2237.16 2196.41 404.14 -346.28 541360.96 6035677.36 70°30'30.2244"N 149°39'41.7040"W 3.50 8.905 3.50 0.18 337.87 7.44 7.16 3.63 336.76 2400.00 39.76 320.91 2275.87 2235.12 428.66 -366.28 541340.82 6035701.77 70°30'30.4656"N 149°39'42.2933"W 1.98 8.534 1.96 0.48 358.55 7.69 7.30 3.74 331.47 2450.00 41.62 321.33 2313.78 2273.03 454.04 -386.74 541320.22 6035727.03 70°30'30.7151"N 149°39'42.8959"W 3.76 -28.583 3.72 0.84 379.99 7.95 7.43 3.84 328.46 2500.00 42.49 320.63 2350.91 2310.16 480.06 -407.83 541298.99 6035752.92 70°30'30.9710"N 149°39'43.5170"W 1.98 13.793 1.74 -1.40 401.95 8.21 7.56 3.95 326.60 Actual Wellpath Geographic Report - including Position Uncertainty Report by Baker Hughes Operator Area Wellpath Wellbore last revised Sidetrack from User Calculation method Field Facility Slot Well Wellbore MPU F Pad MPU F-10 MPU F-10A MPU F-10A MPU F-10A_awp 11/07/2023 MPU F-10APB1_awp at 17485.45 MD Tuftscod Minimum curvature 40.75 ft E 0.00 ft N 0.00 ft Magnetic North is 14.53 degrees East of True North 2.00Std Dev WA_ANC_Defn Projection System North Reference Scale Convergence at Slot Horizontal Reference Point Vertical Reference Point MD Reference Point Field Vertical Reference Rig on MPU F-10 (RT) To Mean Sea Level Section Origin X Section Origin Y 11/7/2023 at 10:06:28 AM using WellArchitect 6.0 Hilcorp Alaska, LLC North Slope, Alaska Milne Point NAD27 / TM Alaska SP, Zone 4 (5004), US feet True 0.999902 0.32 East Slot Rig on MPU F-10 (RT) Rig on MPU F-10 (RT) Mean Sea Level 10.00° included 50-029-22679-01-00 Local East Grid North Longitude Section Azimuth Surface Position Uncertainty API # Declination Ellipse Confidence Limit Database Grid East [US ft] 541709.47 541761.56 558058.04 Slot Location Facility Reference Pt Field Reference Pt Local North [ft] -72.80 Horiz Uncert 1sd [ft] 0.00 0.00 [US ft] 6035275.21 6035348.30 6027347.71 Latitude 70°30'26.2499"N 70°30'26.9659"N 70°29'7.2002"N Positional Uncertainty Model Log Name / Comment Wellbore 149°39'31.5054"W 149°39'29.9591"W 149°31'31.8215"W [ft] -52.51 BH CoilTrak (2019) (Standard) MPU F-10APB1 <Coiltrak MWD> 16698-17944 MPU F-10APB1 BH CoilTrak (2019) (Standard) MPU F-10A < CoilTrak MWD>17511 - 18239.21 MPU F-10A BH Generic gyro - continuous (Drillpipe) MPU F-10 <GYRO-CT_DRILL PIPE> 100.00 - 8100.00 MPU F-10 OWSG MWD rev2 - Standard MPU F-10 <MWD> 8132.64 - 16994.86 MPU F-10 Page 1 of 4 # 2550.00 44.02 321.17 2387.32 2346.57 506.65 -429.44 541277.24 6035779.39 70°30'31.2325"N 149°39'44.1533"W 3.15 2.874 3.06 1.08 424.38 8.49 7.67 4.05 325.33 2600.00 45.15 321.25 2422.93 2382.18 534.01 -451.42 541255.10 6035806.62 70°30'31.5015"N 149°39'44.8010"W 2.26 -12.388 2.26 0.16 447.50 8.78 7.79 4.16 324.47 2650.00 46.37 320.88 2457.81 2417.06 561.87 -473.94 541232.43 6035834.35 70°30'31.7755"N 149°39'45.4641"W 2.50 27.468 2.44 -0.74 471.04 9.07 7.90 4.27 323.83 2700.00 47.19 321.46 2492.05 2451.30 590.25 -496.78 541209.43 6035862.61 70°30'32.0547"N 149°39'46.1370"W 1.85 -19.368 1.64 1.16 495.02 9.36 8.01 4.39 323.35 2750.00 48.71 320.75 2525.54 2484.79 619.15 -520.09 541185.96 6035891.37 70°30'32.3388"N 149°39'46.8237"W 3.22 9.929 3.04 -1.42 519.43 9.67 8.12 4.50 322.97 2800.00 49.58 320.95 2558.25 2517.50 648.48 -543.97 541161.92 6035920.56 70°30'32.6272"N 149°39'47.5270"W 1.77 -53.226 1.74 0.40 544.16 9.98 8.23 4.62 322.65 2850.00 50.52 319.34 2590.36 2549.61 677.90 -568.54 541137.19 6035949.84 70°30'32.9166"N 149°39'48.2505"W 3.10 4.913 1.88 -3.22 568.87 10.30 8.33 4.73 322.35 2900.00 51.80 319.48 2621.71 2580.96 707.47 -593.87 541111.69 6035979.26 70°30'33.2074"N 149°39'48.9969"W 2.57 -39.552 2.56 0.28 593.60 10.62 8.43 4.85 322.04 2950.00 52.67 318.58 2652.33 2611.58 737.31 -619.79 541085.61 6036008.96 70°30'33.5009"N 149°39'49.7603"W 2.25 33.538 1.74 -1.80 618.49 10.95 8.53 4.98 321.77 3000.00 53.62 319.36 2682.32 2641.57 767.49 -646.05 541059.18 6036038.99 70°30'33.7977"N 149°39'50.5339"W 2.27 -31.498 1.90 1.56 643.65 11.28 8.62 5.10 321.52 3050.00 54.23 318.90 2711.77 2671.02 798.05 -672.50 541032.57 6036069.39 70°30'34.0982"N 149°39'51.3128"W 1.43 30.535 1.22 -0.92 669.15 11.62 8.72 5.22 321.32 3100.00 55.32 319.68 2740.61 2699.86 829.01 -699.13 541005.76 6036100.20 70°30'34.4027"N 149°39'52.0975"W 2.53 -51.44 2.18 1.56 695.02 11.97 8.81 5.35 321.16 3150.00 55.71 319.09 2768.92 2728.17 860.30 -725.96 540978.76 6036131.33 70°30'34.7103"N 149°39'52.8878"W 1.25 11.798 0.78 -1.18 721.17 12.32 8.90 5.48 321.02 3200.00 57.57 319.55 2796.41 2755.66 891.97 -753.18 540951.37 6036162.85 70°30'35.0217"N 149°39'53.6896"W 3.80 -36.024 3.72 0.92 747.63 12.67 8.99 5.61 320.90 3250.00 58.63 318.65 2822.83 2782.08 924.05 -780.98 540923.40 6036194.77 70°30'35.3372"N 149°39'54.5083"W 2.61 21.965 2.12 -1.80 774.40 13.03 9.08 5.75 320.78 3300.00 60.71 319.61 2848.08 2807.33 956.69 -809.21 540894.98 6036227.24 70°30'35.6582"N 149°39'55.3400"W 4.48 -28.662 4.16 1.92 801.63 13.40 9.16 5.89 320.67 3350.00 61.89 318.88 2872.09 2831.34 989.91 -837.84 540866.17 6036260.30 70°30'35.9848"N 149°39'56.1835"W 2.69 16.915 2.36 -1.46 829.38 13.78 9.24 6.04 320.57 3400.00 63.87 319.55 2894.88 2854.13 1023.60 -866.91 540836.92 6036293.83 70°30'36.3162"N 149°39'57.0397"W 4.14 -40.322 3.96 1.34 857.51 14.16 9.31 6.18 320.49 3450.00 64.93 318.56 2916.49 2875.74 1057.66 -896.46 540807.18 6036327.71 70°30'36.6511"N 149°39'57.9103"W 2.77 8.459 2.12 -1.98 885.92 14.54 9.38 6.33 320.41 3500.00 66.91 318.88 2936.89 2896.14 1091.96 -926.57 540776.87 6036361.84 70°30'36.9884"N 149°39'58.7974"W 4.00 -5.943 3.96 0.64 914.48 14.93 9.45 6.47 320.31 3550.00 67.71 318.79 2956.17 2915.42 1126.69 -956.94 540746.32 6036396.40 70°30'37.3299"N 149°39'59.6919"W 1.61 -21.684 1.60 -0.18 943.40 15.33 9.51 6.62 320.24 3600.00 69.24 318.14 2974.52 2933.77 1161.51 -987.78 540715.29 6036431.04 70°30'37.6723"N 149°40'0.6005"W 3.29 -57.999 3.06 -1.30 972.33 15.73 9.57 6.76 320.15 3650.00 70.17 316.57 2991.86 2951.11 1196.00 -1019.55 540683.33 6036465.35 70°30'38.0115"N 149°40'1.5364"W 3.48 62.017 1.86 -3.14 1000.78 16.14 9.63 6.91 320.03 3700.00 72.11 320.33 3008.03 2967.28 1231.40 -1050.92 540651.76 6036500.57 70°30'38.3596"N 149°40'2.4605"W 8.10 39.986 3.88 7.52 1030.21 16.56 9.68 7.05 319.96 3800.00 73.07 321.17 3037.95 2997.20 1305.30 -1111.29 540590.99 6036574.12 70°30'39.0862"N 149°40'4.2390"W 1.25 -86.209 0.96 0.84 1092.49 17.45 9.78 7.37 319.99 3900.00 73.20 319.26 3066.96 3026.21 1378.83 -1172.52 540529.34 6036647.30 70°30'39.8094"N 149°40'6.0431"W 1.83 -108.6 0.13 -1.91 1154.28 18.30 9.88 7.67 319.99 4000.00 72.30 316.39 3096.62 3055.87 1449.60 -1236.63 540464.85 6036717.70 70°30'40.5053"N 149°40'7.9318"W 2.88 90.494 -0.90 -2.87 1212.84 19.159.98 7.96319.84 4100.00 72.30 319.64 3127.03 3086.28 1520.40 -1300.34 540400.74 6036788.14 70°30'41.2015"N 149°40'9.8090"W 3.10 -13.648 0.00 3.25 1271.50 20.03 10.09 8.26 319.73 4200.00 72.93 319.48 3156.91 3116.16 1593.03 -1362.25 540338.44 6036860.41 70°30'41.9157"N 149°40'11.6328"W 0.65 69.832 0.63 -0.16 1332.28 20.96 10.20 8.56 319.71 4300.00 73.22 320.30 3186.03 3145.28 1666.20 -1423.88 540276.40 6036933.23 70°30'42.6351"N 149°40'13.4487"W 0.84 -91.406 0.29 0.82 1393.63 21.83 10.30 8.87 319.71 4400.00 73.18 318.10 3214.93 3174.18 1738.67 -1486.43 540213.45 6037005.33 70°30'43.3477"N 149°40'15.2917"W 2.11 99.672 -0.04 -2.20 1454.14 22.72 10.41 9.18 319.67 4500.00 72.73 320.99 3244.25 3203.50 1811.40 -1548.46 540151.02 6037077.71 70°30'44.0629"N 149°40'17.1193"W 2.80 -83.248 -0.45 2.89 1515.00 23.63 10.52 9.49 319.66 4600.00 73.11 317.85 3273.63 3232.88 1883.99 -1610.63 540088.45 6037149.94 70°30'44.7767"N 149°40'18.9513"W 3.03 149.674 0.38 -3.14 1575.69 24.56 10.63 9.80 319.65 4700.00 72.07 318.49 3303.55 3262.80 1955.09 -1674.27 540024.42 6037220.67 70°30'45.4757"N 149°40'20.8264"W 1.21 85.18 -1.04 0.64 1634.65 25.47 10.75 10.12 319.58 4800.00 72.17 319.69 3334.25 3293.50 2027.01 -1736.59 539961.70 6037292.24 70°30'46.1829"N 149°40'22.6628"W 1.15 34.279 0.10 1.20 1694.66 26.38 10.87 10.45 319.56 4900.00 72.52 319.94 3364.58 3323.83 2099.81 -1798.08 539899.81 6037364.68 70°30'46.8987"N 149°40'24.4746"W 0.42 46.914 0.35 0.25 1755.68 27.30 10.98 10.78 319.56 5000.00 72.86 320.32 3394.33 3353.58 2173.08 -1859.28 539838.21 6037437.60 70°30'47.6192"N 149°40'26.2781"W 0.50 -144.401 0.34 0.38 1817.21 28.22 11.10 11.10 319.58 5100.00 72.70 320.20 3423.94 3383.19 2246.53 -1920.35 539776.74 6037510.70 70°30'48.3414"N 149°40'28.0775"W 0.20 -127.993 -0.16 -0.12 1878.94 29.15 11.22 11.43 319.60 5200.00 72.41 319.81 3453.92 3413.17 2319.62 -1981.66 539715.02 6037583.43 70°30'49.0600"N 149°40'29.8844"W 0.47 -143.149 -0.29 -0.39 1940.27 30.09 11.34 11.75 319.61 5300.00 71.84 319.36 3484.61 3443.86 2392.08 -2043.36 539652.92 6037655.54 70°30'49.7725"N 149°40'31.7027"W 0.71 106.565 -0.57 -0.45 2000.91 31.03 11.47 12.08 319.61 5400.00 71.07 322.17 3516.42 3475.67 2465.50 -2103.32 539592.55 6037728.62 70°30'50.4944"N 149°40'33.4698"W 2.77 -80.858 -0.77 2.81 2062.81 31.99 11.60 12.42 319.64 5500.00 71.53 319.30 3548.49 3507.74 2538.82 -2163.27 539532.20 6037801.60 70°30'51.2153"N 149°40'35.2364"W 2.76 83.527 0.46 -2.87 2124.61 32.96 11.73 12.76 319.68 5600.00 71.59 319.85 3580.12 3539.37 2611.04 -2224.78 539470.29 6037873.46 70°30'51.9254"N 149°40'37.0493"W 0.53 8.251 0.06 0.55 2185.04 33.92 11.87 13.09 319.67 5700.00 73.91 320.20 3609.77 3569.02 2684.22 -2286.13 539408.53 6037946.29 70°30'52.6449"N 149°40'38.8574"W 2.34 84.954 2.32 0.35 2246.46 34.89 11.99 13.44 319.68 5800.00 73.96 320.78 3637.45 3596.70 2758.36 -2347.27 539346.99 6038020.07 70°30'53.3739"N 149°40'40.6593"W 0.56 113.192 0.05 0.58 2308.86 35.87 12.12 13.82 319.70 5900.00 72.57 324.25 3666.25 3625.50 2834.33 -2405.55 539288.29 6038095.71 70°30'54.1208"N 149°40'42.3768"W 3.60 -104.71 -1.39 3.47 2373.55 36.87 12.25 14.16 319.79 6000.00 71.87 321.36 3696.79 3656.04 2910.18 -2463.10 539230.32 6038171.22 70°30'54.8666"N 149°40'44.0732"W 2.84 -112.507 -0.70 -2.89 2438.25 37.89 12.38 14.52 319.88 6100.00 70.45 317.63 3729.09 3688.34 2982.13 -2524.55 539168.47 6038242.82 70°30'55.5740"N 149°40'45.8843"W 3.80 72.411 -1.42 -3.73 2498.44 38.87 12.52 14.86 319.87 6200.00 71.23 320.17 3761.92 3721.17 3053.31 -2586.63 539106.00 6038313.64 70°30'56.2738"N 149°40'47.7142"W 2.52 140.599 0.78 2.54 2557.76 39.87 12.67 15.21 319.84 6300.00 68.57 322.53 3796.28 3755.53 3126.62 -2645.29 539046.94 6038386.62 70°30'56.9946"N 149°40'49.4431"W 3.46 55.361 -2.66 2.36 2619.77 40.88 12.82 15.57 319.88 6400.00 69.16 323.44 3832.34 3791.59 3201.10 -2701.44 538990.37 6038460.77 70°30'57.7269"N 149°40'51.0983"W 1.03 -127.901 0.59 0.91 2683.37 41.88 12.99 15.96 319.96 6500.00 68.87 323.04 3868.15 3827.40 3275.90 -2757.31 538934.08 6038535.25 70°30'58.4623"N 149°40'52.7454"W 0.47 65.42 -0.29 -0.40 2747.33 42.88 13.14 16.29 320.04 6600.00 69.24 323.90 3903.90 3863.15 3350.95 -2812.90 538878.08 6038609.98 70°30'59.2002"N 149°40'54.3841"W 0.88 -2.651 0.37 0.86 2811.58 43.88 13.30 16.63 320.12 6700.00 71.91 323.77 3937.16 3896.41 3427.08 -2868.55 538822.01 6038685.78 70°30'59.9487"N 149°40'56.0245"W 2.67 10.384 2.67 -0.13 2876.89 44.90 13.45 16.99 320.21 6800.00 73.48 324.07 3966.90 3926.15 3504.23 -2924.77 538765.36 6038762.62 70°31'0.7073"N 149°40'57.6820"W 1.60 141.167 1.57 0.30 2943.12 45.93 13.59 17.38 320.30 6900.00 72.51 324.89 3996.15 3955.40 3582.06 -2980.33 538709.37 6038840.13 70°31'1.4725"N 149°40'59.3199"W 1.25 -76.724 -0.97 0.82 3010.12 46.97 13.73 17.74 320.39 7000.00 73.40 321.11 4025.47 3984.72 3658.40 -3037.86 538651.42 6038916.13 70°31'2.2230"N 149°41'1.0160"W 3.72 125.865 0.89 -3.78 3075.30 48.02 13.87 18.08 320.45 7100.00 71.92 323.28 4055.27 4014.52 3733.81 -3096.38 538592.49 6038991.20 70°31'2.9644"N 149°41'2.7410"W 2.55 -84.829 -1.48 2.17 3139.40 49.08 14.02 18.44 320.49 7200.00 72.07 321.62 4086.19 4045.44 3809.20 -3154.34 538534.12 6039066.26 70°31'3.7056"N 149°41'4.4497"W 1.59 -1.153 0.15 -1.66 3203.59 50.14 14.16 18.79 320.54 7300.00 74.95 321.56 4114.57 4073.82 3884.33 -3213.90 538474.13 6039141.05 70°31'4.4442"N 149°41'6.2058"W 2.88 139.541 2.88 -0.06 3267.23 51.21 14.30 19.15 320.56 7400.00 74.69 321.79 4140.75 4100.00 3960.04 -3273.75 538413.87 6039216.42 70°31'5.1886"N 149°41'7.9703"W 0.34 62.418 -0.26 0.23 3331.40 52.29 14.44 19.54 320.58 7500.00 75.32 323.03 4166.63 4125.88 4036.58 -3332.67 538354.52 6039292.62 70°31'5.9411"N 149°41'9.7075"W 1.35 147.731 0.63 1.24 3396.55 53.38 14.58 19.89 320.62 7600.00 74.36 323.66 4192.78 4152.03 4114.01 -3390.29 538296.47 6039369.71 70°31'6.7023"N 149°41'11.4064"W 1.14 -116.238 -0.96 0.63 3462.79 54.48 14.71 20.23 320.68 7700.00 73.60 322.04 4220.38 4179.63 4190.62 -3448.33 538238.01 6039445.99 70°31'7.4555"N 149°41'13.1177"W 1.73 -27.116 -0.76 -1.62 3528.16 55.58 14.85 20.58 320.72 7800.00 73.75 321.96 4248.49 4207.74 4266.25 -3507.42 538178.51 6039521.27 70°31'8.1989"N 149°41'14.8598"W 0.17 -110.556 0.15 -0.08 3592.38 56.68 14.99 20.93 320.75 7900.00 72.67 318.88 4277.38 4236.63 4340.03 -3568.40 538117.12 6039594.70 70°31'8.9243"N 149°41'16.6579"W 3.14 22.292 -1.08 -3.08 3654.45 57.79 15.14 21.28 320.74 8000.00 73.63 319.29 4306.37 4265.62 4412.35 -3631.08 538054.04 6039666.66 70°31'9.6353"N 149°41'18.5060"W 1.04 -39.387 0.96 0.41 3714.79 58.90 15.29 21.63 320.71 8100.00 74.63 318.44 4333.71 4292.96 4484.79 -3694.36 537990.36 6039738.74 70°31'10.3474"N 149°41'20.3717"W 1.29 109.868 1.00 -0.85 3775.14 60.03 15.43 21.98 320.67 8132.64 73.69 321.20 4342.62 4301.87 4508.78 -3714.62 537969.97 6039762.61 70°31'10.5832"N 149°41'20.9690"W 8.63 -148.562 -2.88 8.46 3795.24 60.22 16.95 21.73 320.69 8227.38 73.08 320.81 4369.71 4328.96 4579.34 -3771.74 537912.46 6039832.84 70°31'11.2768"N 149°41'22.6535"W 0.76 -72.063 -0.64 -0.41 3854.81 60.43 17.03 21.75 320.69 8323.02 73.27 320.20 4397.39 4356.64 4649.98 -3829.97 537853.84 6039903.15 70°31'11.9713"N 149°41'24.3703"W 0.64 -46.862 0.20 -0.64 3914.27 60.96 17.11 21.79 320.69 8418.33 73.63 319.80 4424.54 4383.79 4719.97 -3888.69 537794.73 6039972.80 70°31'12.6593"N 149°41'26.1020"W 0.55 66.399 0.38 -0.42 3973.00 61.79 17.20 21.86 320.68 8513.28 73.87 320.37 4451.11 4410.36 4789.88 -3947.18 537735.85 6040042.38 70°31'13.3466"N 149°41'27.8267"W 0.63 -64.176 0.25 0.60 4031.69 62.92 17.29 21.95 320.67 8562.08 74.31 319.43 4464.49 4423.74 4825.78 -3977.41 537705.43 6040078.10 70°31'13.6995"N 149°41'28.7181"W 2.06 148.105 0.90 -1.93 4061.80 63.61 17.34 22.00 320.65 8683.86 74.14 319.54 4497.60 4456.85 4914.88 -4053.55 537628.80 6040166.76 70°31'14.5753"N 149°41'30.9632"W 0.16 -64.358 -0.14 0.09 4136.32 65.64 17.46 22.16 320.60 8774.69 75.55 316.55 4521.35 4480.60 4980.06 -4112.15 537569.83 6040231.61 70°31'15.2160"N 149°41'32.6915"W 3.54 90.062 1.55 -3.29 4190.33 67.45 17.56 22.30 320.51 8869.24 75.55 317.05 4544.94 4504.19 5046.80 -4174.83 537506.79 6040297.99 70°31'15.8721"N 149°41'34.5397"W 0.51 83.228 0.00 0.53 4245.18 69.59 17.67 22.46 320.37 8963.60 75.66 317.99 4568.40 4527.65 5114.21 -4236.55 537444.70 6040365.04 70°31'16.5347"N 149°41'36.3598"W 0.97 -89.503 0.12 1.00 4300.84 71.93 17.78 22.65 320.23 9059.13 75.67 317.03 4592.05 4551.30 5182.46 -4299.07 537381.80 6040432.93 70°31'17.2055"N 149°41'38.2034"W 0.97 -136.202 0.01 -1.00 4357.20 74.50 17.89 22.86 320.10 9153.15 74.14 315.50 4616.54 4575.79 5248.05 -4361.82 537318.69 6040498.16 70°31'17.8502"N 149°41'40.0538"W 2.26 -39.845 -1.63 -1.63 4410.89 77.21 18.01 23.09 319.91 9248.25 74.29 315.37 4642.41 4601.66 5313.25 -4426.04 537254.12 6040562.99 70°31'18.4910"N 149°41'41.9475"W 0.21 -98.144 0.16 -0.14 4463.95 80.12 18.14 23.33 319.70 9343.16 74.09 313.88 4668.27 4627.52 5377.39 -4491.03 537188.77 6040626.77 70°31'19.1215"N 149°41'43.8640"W 1.53 -176.408 -0.21 -1.57 4515.84 83.17 18.28 23.60 319.46 9437.88 72.57 313.78 4695.44 4654.69 5440.23 -4556.48 537122.97 6040689.23 70°31'19.7391"N 149°41'45.7943"W 1.61 104.183 -1.60 -0.11 4566.36 86.34 18.43 23.88 319.19 9533.20 72.36 314.66 4724.16 4683.41 5503.62 -4621.62 537057.49 6040752.24 70°31'20.3621"N 149°41'47.7152"W 0.91 106.458 -0.22 0.92 4617.47 89.61 18.58 24.17 318.95 9626.79 72.01 315.92 4752.79 4712.04 5566.94 -4684.31 536994.45 6040815.21 70°31'20.9845"N 149°41'49.5638"W 1.34 -101.611 -0.37 1.35 4668.94 92.91 18.73 24.48 318.76 9720.12 71.74 314.51 4781.83 4741.08 5629.89 -4746.79 536931.63 6040877.80 70°31'21.6032"N 149°41'51.4065"W 1.46 65.391 -0.29 -1.51 4720.09 96.27 18.88 24.80 318.59 9816.07 72.49 316.21 4811.30 4770.55 5694.86 -4810.94 536867.11 6040942.40 70°31'22.2418"N 149°41'53.2986"W 1.86 56.776 0.78 1.77 4772.93 99.81 19.03 25.14 318.42Page 2 of 4 # 9910.67 72.54 316.29 4839.72 4798.97 5760.04 -4873.34 536804.36 6041007.23 70°31'22.8824"N 149°41'55.1388"W 0.10 82.877 0.05 0.08 4826.29 103.37 19.18 25.49 318.30 10004.81 72.79 318.30 4867.77 4827.02 5826.07 -4934.28 536743.05 6041072.91 70°31'23.5314"N 149°41'56.9363"W 2.06 -158.44 0.27 2.14 4880.73 106.96 19.33 25.85 318.23 10099.86 72.38 318.13 4896.22 4855.47 5893.70 -4994.71 536682.25 6041140.19 70°31'24.1961"N 149°41'58.7188"W 0.46 63.869 -0.43 -0.18 4936.84 110.61 19.47 26.23 318.19 10194.92 72.53 318.45 4924.88 4884.13 5961.36 -5055.02 536621.57 6041207.50 70°31'24.8611"N 149°42'0.4976"W 0.36 80.63 0.16 0.34 4993.00 114.31 19.61 26.62 318.16 10289.26 72.56 318.64 4953.17 4912.42 6028.81 -5114.60 536561.62 6041274.61 70°31'25.5241"N 149°42'2.2551"W 0.19 45.868 0.03 0.20 5049.08 118.02 19.75 27.03 318.15 10382.70 72.95 319.06 4980.88 4940.13 6096.01 -5173.32 536502.52 6041341.47 70°31'26.1845"N 149°42'3.9872"W 0.60 -92.517 0.42 0.45 5105.06 121.74 19.89 27.43 318.14 10477.92 72.93 318.57 5008.81 4968.06 6164.52 -5233.26 536442.20 6041409.63 70°31'26.8579"N 149°42'5.7554"W 0.49 -28.263 -0.02 -0.51 5162.12 125.57 20.04 27.86 318.14 10572.39 73.34 318.34 5036.22 4995.47 6232.18 -5293.22 536381.87 6041476.95 70°31'27.5229"N 149°42'7.5241"W 0.49 80.1 0.43 -0.24 5218.34 129.42 20.19 28.30 318.13 10665.25 73.60 319.86 5062.64 5021.89 6299.47 -5351.51 536323.22 6041543.90 70°31'28.1842"N 149°42'9.2435"W 1.59 -125.688 0.28 1.64 5274.48 133.23 20.33 28.74 318.14 10759.03 73.38 319.54 5089.29 5048.54 6368.04 -5409.66 536264.68 6041612.14 70°31'28.8582"N 149°42'10.9591"W 0.40 -86.128 -0.23 -0.34 5331.92 137.09 20.48 29.19 318.16 10854.00 73.43 318.79 5116.41 5075.66 6436.90 -5469.17 536204.79 6041680.66 70°31'29.5350"N 149°42'12.7148"W 0.76 -88.767 0.05 -0.79 5389.40 141.04 20.63 29.66 318.18 10947.47 73.45 317.91 5143.06 5102.31 6503.85 -5528.71 536144.88 6041747.26 70°31'30.1929"N 149°42'14.4713"W 0.90 79.598 0.02 -0.94 5444.99 144.97 20.79 30.13 318.17 11043.07 73.87 320.22 5169.96 5129.21 6573.15 -5588.82 536084.40 6041816.22 70°31'30.8740"N 149°42'16.2444"W 2.36 -82.985 0.44 2.42 5502.80 149.00 20.95 30.62 318.18 11137.36 73.96 319.47 5196.08 5155.33 6642.39 -5647.24 536025.59 6041885.13 70°31'31.5546"N 149°42'17.9680"W 0.77 120.581 0.10 -0.80 5560.84 152.98 21.10 31.11 318.21 11232.64 73.57 320.16 5222.72 5181.97 6712.28 -5706.27 535966.18 6041954.67 70°31'32.2415"N 149°42'19.7096"W 0.81 -38.113 -0.41 0.72 5619.42 157.02 21.26 31.61 318.24 11326.45 73.95 319.85 5248.95 5208.20 6781.28 -5764.16 535907.91 6042023.34 70°31'32.9196"N 149°42'21.4175"W 0.51 81.824 0.41 -0.33 5677.32 161.01 21.42 32.11 318.27 11421.25 74.18 321.47 5274.98 5234.23 6851.77 -5821.94 535849.74 6042093.51 70°31'33.6125"N 149°42'23.1224"W 1.66 27.421 0.24 1.71 5736.71 165.04 21.58 32.63 318.32 11516.46 74.44 321.61 5300.73 5259.98 6923.55 -5878.95 535792.33 6042164.95 70°31'34.3180"N 149°42'24.8047"W 0.31 135.059 0.27 0.15 5797.50 169.08 21.74 33.15 318.39 11610.86 73.32 322.78 5326.94 5286.19 6995.20 -5934.54 535736.35 6042236.28 70°31'35.0222"N 149°42'26.4450"W 1.68 -73.784 -1.19 1.24 5858.40 173.06 21.90 33.68 318.47 11703.62 73.46 322.28 5353.46 5312.71 7065.75 -5988.61 535681.88 6042306.52 70°31'35.7156"N 149°42'28.0408"W 0.54 -178.263 0.15 -0.54 5918.49 176.96 22.06 34.20 318.56 11790.81 72.83 322.26 5378.74 5337.99 7131.74 -6039.68 535630.45 6042372.22 70°31'36.3642"N 149°42'29.5476"W 0.72 -55.112 -0.72 -0.02 5974.62 180.64 22.22 34.69 318.63 11885.16 72.89 322.17 5406.54 5365.79 7203.00 -6094.92 535574.82 6042443.16 70°31'37.0645"N 149°42'31.1778"W 0.11 -145.084 0.06 -0.10 6035.20 184.63 22.39 35.23 318.70 11979.08 72.29 321.73 5434.64 5393.89 7273.57 -6150.15 535519.20 6042513.41 70°31'37.7581"N 149°42'32.8077"W 0.78 -47.324 -0.64 -0.47 6095.11 188.61 22.57 35.77 318.76 12074.02 72.51 321.48 5463.35 5422.60 7344.50 -6206.36 535462.60 6042584.01 70°31'38.4552"N 149°42'34.4664"W 0.34 114.944 0.23 -0.26 6155.19 192.65 22.75 36.32 318.82 12169.44 71.87 322.94 5492.54 5451.79 7416.28 -6262.03 535406.53 6042655.48 70°31'39.1608"N 149°42'36.1092"W 1.60 -144.528 -0.67 1.53 6216.23 196.69 22.94 36.87 318.89 12263.75 71.83 322.91 5521.92 5481.17 7487.79 -6316.05 535352.11 6042726.67 70°31'39.8635"N 149°42'37.7037"W 0.05 -83.319 -0.04 -0.03 6277.26 200.65 23.12 37.42 318.96 12358.95 71.93 322.03 5551.52 5510.77 7559.54 -6371.17 535296.60 6042798.10 70°31'40.5687"N 149°42'39.3304"W 0.88 -79.528 0.11 -0.92 6338.35 204.68 23.32 37.98 319.03 12452.37 72.04 321.41 5580.42 5539.67 7629.28 -6426.21 535241.18 6042867.53 70°31'41.2541"N 149°42'40.9547"W 0.64 -16.86 0.12 -0.66 6397.47 208.67 23.51 38.54 319.08 12546.10 72.26 321.34 5609.15 5568.40 7698.98 -6481.90 535185.10 6042936.91 70°31'41.9391"N 149°42'42.5983"W 0.25 -72.81 0.23 -0.07 6456.44 212.70 23.70 39.10 319.12 12641.40 72.63 320.10 5637.89 5597.14 7769.31 -6539.42 535127.19 6043006.91 70°31'42.6303"N 149°42'44.2960"W 1.30 -75.834 0.39 -1.30 6515.72 216.84 23.90 39.68 319.15 12735.55 72.80 319.40 5665.87 5625.12 7837.92 -6597.51 535068.72 6043075.18 70°31'43.3045"N 149°42'46.0103"W 0.73 -170.785 0.18 -0.74 6573.20 220.97 24.10 40.25 319.15 12829.33 71.34 319.15 5694.74 5653.99 7905.54 -6655.72 535010.14 6043142.47 70°31'43.9690"N 149°42'47.7282"W 1.58 -30.162 -1.56 -0.27 6629.68 225.09 24.30 40.82 319.15 12924.11 71.88 318.82 5724.64 5683.89 7973.40 -6714.74 534950.74 6043209.99 70°31'44.6359"N 149°42'49.4701"W 0.66 0 0.57 -0.35 6686.26 229.25 24.51 41.40 319.15 13019.16 72.15 318.82 5753.99 5713.24 8041.44 -6774.27 534890.84 6043277.69 70°31'45.3046"N 149°42'51.2269"W 0.28 72.615 0.28 0.00 6742.94 233.45 24.72 41.99 319.14 13114.75 72.61 320.34 5782.92 5742.17 8110.80 -6833.34 534831.39 6043346.71 70°31'45.9861"N 149°42'52.9702"W 1.59 -31.779 0.48 1.59 6800.98 237.66 24.93 42.58 319.14 13207.75 73.12 320.01 5810.32 5769.57 8179.05 -6890.25 534774.10 6043414.64 70°31'46.6569"N 149°42'54.6502"W 0.64 -68.93 0.55 -0.35 6858.32 241.76 25.13 43.16 319.16 13300.04 73.32 319.47 5836.97 5796.22 8246.48 -6947.36 534716.62 6043481.74 70°31'47.3195"N 149°42'56.3356"W 0.60 129.288 0.22 -0.59 6914.81 245.86 25.33 43.74 319.17 13394.92 72.38 320.68 5864.95 5824.20 8316.01 -7005.54 534658.05 6043550.93 70°31'48.0027"N 149°42'58.0530"W 1.57 -39.588 -0.99 1.28 6973.17 250.06 25.54 44.34 319.18 13490.07 73.11 320.05 5893.17 5852.42 8385.98 -7063.51 534599.70 6043620.57 70°31'48.6904"N 149°42'59.7640"W 0.99 -36.37 0.77 -0.66 7032.02 254.26 25.76 44.95 319.20 13583.31 73.54 319.72 5919.92 5879.17 8454.29 -7121.06 534541.78 6043688.55 70°31'49.3616"N 149°43'1.4627"W 0.57 -177.664 0.46 -0.35 7089.29 258.41 25.96 45.55 319.21 13677.91 72.14 319.66 5947.83 5907.08 8523.22 -7179.53 534482.92 6043757.13 70°31'50.0389"N 149°43'3.1887"W 1.48 34.915 -1.48 -0.06 7147.02 262.62 26.18 46.15 319.21 13771.51 72.77 320.12 5976.05 5935.30 8591.47 -7237.03 534425.05 6043825.06 70°31'50.7096"N 149°43'4.8859"W 0.82 -173.464 0.67 0.49 7204.25 266.77 26.39 46.75 319.22 13867.41 71.20 319.93 6005.71 5964.96 8661.36 -7295.61 534366.08 6043894.61 70°31'51.3964"N 149°43'6.6154"W 1.65 -32.819 -1.64 -0.20 7262.90 271.01 26.62 47.36 319.23 13961.89 71.76 319.55 6035.72 5994.97 8729.72 -7353.51 534307.80 6043962.64 70°31'52.0682"N 149°43'8.3244"W 0.70 -74.67 0.59 -0.40 7320.18 275.17 26.84 47.97 319.24 14056.90 72.05 318.45 6065.23 6024.48 8797.88 -7412.76 534248.18 6044030.46 70°31'52.7379"N 149°43'10.0734"W 1.14 48.036 0.31 -1.16 7377.01 279.40 27.07 48.58 319.24 14150.84 72.73 319.24 6093.65 6052.90 8865.30 -7471.68 534188.88 6044097.53 70°31'53.4003"N 149°43'11.8128"W 1.08 -87.373 0.72 0.84 7433.17 283.61 27.29 49.19 319.23 14245.79 72.76 318.58 6121.81 6081.06 8933.64 -7531.28 534128.91 6044165.53 70°31'54.0718"N 149°43'13.5720"W 0.66 179.633 0.03 -0.70 7490.12 287.88 27.52 49.81 319.22 14341.34 71.28 318.59 6151.31 6110.56 9001.79 -7591.40 534068.42 6044233.34 70°31'54.7415"N 149°43'15.3467"W 1.55 -51.307 -1.55 0.01 7546.80 292.16 27.75 50.43 319.21 14436.42 71.86 317.83 6181.37 6140.62 9069.04 -7651.51 534007.93 6044300.25 70°31'55.4023"N 149°43'17.1213"W 0.97 37.314 0.61 -0.80 7602.59 296.41 27.98 51.05 319.20 14528.44 72.21 318.11 6209.75 6169.00 9134.06 -7710.11 533948.97 6044364.93 70°31'56.0412"N 149°43'18.8513"W 0.48 66.221 0.38 0.30 7656.45 300.56 28.21 51.65 319.18 14601.89 72.83 319.57 6231.81 6191.06 9186.81 -7756.22 533902.57 6044417.41 70°31'56.5594"N 149°43'20.2125"W 2.08 -127.102 0.84 1.99 7700.39 303.86 28.39 52.13 319.17 14696.33 72.47 319.07 6259.98 6219.23 9255.17 -7814.98 533843.44 6044485.43 70°31'57.2311"N 149°43'21.9472"W 0.63 18.926 -0.38 -0.53 7757.51 308.10 28.62 52.76 319.17 14789.11 73.14 319.31 6287.40 6246.65 9322.25 -7872.90 533785.14 6044552.19 70°31'57.8903"N 149°43'23.6573"W 0.76 -168.099 0.72 0.26 7813.51 312.28 28.84 53.37 319.17 14883.60 71.52 318.95 6316.08 6275.33 9390.33 -7931.81 533725.86 6044619.93 70°31'58.5592"N 149°43'25.3966"W 1.75 10.551 -1.71 -0.38 7870.33 316.52 29.08 54.00 319.17 14978.52 72.39 319.12 6345.49 6304.74 9458.48 -7990.98 533666.31 6044687.74 70°31'59.2288"N 149°43'27.1434"W 0.93 5.058 0.92 0.18 7927.17 320.77 29.32 54.63 319.17 15073.56 72.93 319.17 6373.81 6333.06 9527.10 -8050.33 533606.59 6044756.01 70°31'59.9030"N 149°43'28.8956"W 0.57 166.934 0.57 0.05 7984.44 325.06 29.55 55.26 319.17 15168.47 71.50 319.52 6402.80 6362.05 9595.66 -8109.20 533547.34 6044824.23 70°32'0.5766"N 149°43'30.6340"W 1.55 160.868 -1.51 0.37 8041.73 329.31 29.79 55.89 319.17 15261.39 69.85 320.13 6433.55 6392.80 9662.65 -8165.77 533490.40 6044890.90 70°32'1.2349"N 149°43'32.3043"W 1.88 163.535 -1.78 0.66 8097.89 333.41 30.03 56.50 319.17 15356.82 68.31 320.62 6467.62 6426.87 9731.31 -8222.62 533433.17 6044959.23 70°32'1.9094"N 149°43'33.9829"W 1.68 170.996 -1.61 0.51 8155.63 337.54 30.30 57.12 319.19 15452.18 66.63 320.91 6504.16 6463.41 9799.53 -8278.33 533377.08 6045027.13 70°32'2.5798"N 149°43'35.6280"W 1.78 -179.282 -1.76 0.30 8213.14 341.59 30.57 57.73 319.21 15546.54 64.47 320.88 6543.22 6502.47 9866.18 -8332.51 533322.54 6045093.47 70°32'3.2347"N 149°43'37.2279"W 2.29 -169.122 -2.29 -0.03 8269.37 345.50 30.85 58.32 319.22 15640.94 63.17 320.60 6584.86 6544.11 9931.78 -8386.12 533268.57 6045158.76 70°32'3.8792"N 149°43'38.8110"W 1.40 -163.648 -1.38 -0.30 8324.66 349.34 31.14 58.89 319.24 15735.91 61.20 319.94 6629.18 6588.43 9996.37 -8439.80 533214.53 6045223.05 70°32'4.5139"N 149°43'40.3962"W 2.16 180 -2.07 -0.69 8378.95 353.13 31.44 59.46 319.25 15830.79 59.60 319.94 6676.04 6635.29 10059.51 -8492.89 533161.09 6045285.88 70°32'5.1342"N 149°43'41.9641"W 1.69 -164.185 -1.69 0.00 8431.91 356.82 31.76 60.01 319.26 15925.39 57.75 319.32 6725.22 6684.47 10121.08 -8545.23 533108.41 6045347.15 70°32'5.7391"N 149°43'43.5096"W 2.03 173.766 -1.96 -0.66 8483.45 360.42 32.08 60.55 319.26 16020.12 55.93 319.56 6777.03 6736.28 10181.32 -8596.79 533056.51 6045407.09 70°32'6.3310"N 149°43'45.0323"W 1.93 173.339 -1.92 0.25 8533.83 363.91 32.41 61.06 319.26 16112.78 53.32 319.94 6830.67 6789.92 10238.98 -8645.61 533007.38 6045464.47 70°32'6.8975"N 149°43'46.4739"W 2.84 166.587 -2.82 0.41 8582.13 367.18 32.74 61.55 319.26 16206.64 49.83 321.03 6889.00 6848.25 10295.69 -8692.40 532960.28 6045520.91 70°32'7.4547"N 149°43'47.8558"W 3.83 170.082 -3.72 1.16 8629.85 370.28 33.08 62.01 319.27 16302.87 47.43 321.60 6952.59 6911.84 10352.05 -8737.54 532914.83 6045577.01 70°32'8.0085"N 149°43'49.1890"W 2.53 -154.901 -2.49 0.59 8677.52 373.22 33.44 62.45 319.29 16394.30 46.20 320.80 7015.16 6974.41 10404.01 -8779.31 532872.77 6045628.73 70°32'8.5189"N 149°43'50.4226"W 1.49 -167.745 -1.35 -0.87 8721.44 375.90 33.79 62.85 319.30 16490.56 45.22 320.50 7082.38 7041.63 10457.29 -8823.00 532828.79 6045681.76 70°32'9.0425"N 149°43'51.7129"W 1.04 -103.303 -1.02 -0.31 8766.32 378.65 34.15 63.26 319.31 16584.15 45.18 320.26 7148.33 7107.58 10508.44 -8865.34 532786.16 6045732.67 70°32'9.5450"N 149°43'52.9636"W 0.19 -52.741 -0.04 -0.26 8809.35 381.30 34.51 63.65 319.31 16679.83 45.37 319.91 7215.66 7174.91 10560.58 -8908.96 532742.25 6045784.56 70°32'10.0573"N 149°43'54.2519"W 0.33 11.521 0.20 -0.37 8853.12 384.01 34.89 64.06 319.32 Tie in Point of MPU F-10APB1 to MPU F-10 16698.00 45.51 319.95 7228.41 7187.66 10570.49 -8917.30 532733.86 6045794.42 70°32'10.1546"N 149°43'54.4980"W 0.79 0 0.77 0.22 8861.43 384.32 33.22 65.60 319.32 TOWS 16720.22 52.12 319.95 7243.03 7202.28 10583.29 -8928.05 532723.04 6045807.15 70°32'10.2803"N 149°43'54.8157"W 29.75 0 29.75 0.00 8872.16 384.45 33.26 65.60 319.32 Interpolated Azimuth 16750.32 65.34 319.95 7258.62 7217.87 10602.94 -8944.57 532706.41 6045826.70 70°32'10.4734"N 149°43'55.3035"W 43.92 0 43.92 0.00 8888.64 384.64 33.32 65.62 319.32 Interpolated Azimuth 16780.25 78.37 319.95 7267.92 7227.17 10624.66 -8962.83 532688.03 6045848.32 70°32'10.6868"N 149°43'55.8429"W 43.53 0 43.53 0.00 8906.87 384.86 33.39 65.65 319.32 Interpolated Azimuth 16810.35 91.20 319.95 7270.65 7229.90 10647.56 -8982.08 532668.66 6045871.11 70°32'10.9118"N 149°43'56.4113"W 42.62 60.011 42.62 0.00 8926.08 385.10 33.43 65.69 319.32 Interpolated Azimuth 16825.41 94.43 325.58 7269.91 7229.16 10659.53 -8991.18 532659.49 6045883.03 70°32'11.0294"N 149°43'56.6801"W 43.06 85.995 21.45 37.38 8936.28 385.22 33.45 65.71 319.32 16855.45 95.26 339.47 7267.36 7226.61 10686.02 -9004.95 532645.57 6045909.44 70°32'11.2897"N 149°43'57.0874"W 46.15 82.672 2.76 46.24 8959.98 385.45 33.47 65.71 319.33 16885.59 96.62 351.02 7264.23 7223.48 10714.95 -9012.58 532637.78 6045938.33 70°32'11.5742"N 149°43'57.3133"W 38.38 107.924 4.51 38.32 8987.15 385.68 33.50 65.71 319.34 16915.53 95.32 355.01 7261.12 7220.37 10744.50 -9016.20 532634.00 6045967.85 70°32'11.8648"N 149°43'57.4211"W 13.95 94.704 -4.34 13.33 9015.62 385.88 33.55 65.72 319.36 16945.64 95.04 358.32 7258.40 7217.65 10774.44 -9017.94 532632.08 6045997.77 70°32'12.1592"N 149°43'57.4736"W 10.99 121.175 -0.93 10.99 9044.80 386.07 33.59 65.72 319.39 16975.80 93.13 1.47 7256.25 7215.50 10804.51 -9018.00 532631.86 6046027.85 70°32'12.4550"N 149°43'57.4763"W 12.19 121.133 -6.33 10.44 9074.41 386.26 33.65 65.73 319.41 17005.86 91.63 3.95 7255.00 7214.25 10834.51 -9016.58 532633.11 6046057.85 70°32'12.7500"N 149°43'57.4355"W 9.64 116.175 -4.99 8.25 9104.20 386.44 33.72 65.74 319.44 17035.69 90.40 6.45 7254.47 7213.72 10864.21 -9013.87 532635.65 6046087.56 70°32'13.0421"N 149°43'57.3568"W 9.34 82.876 -4.12 8.38 9133.92 386.61 33.80 65.75 319.46 17065.77 90.86 10.14 7254.14 7213.39 10893.97 -9009.53 532639.82 6046117.34 70°32'13.3348"N 149°43'57.2299"W 12.36 92.046 1.53 12.27 9163.98 386.77 33.89 65.76 319.49Page 3 of 4 # 17095.53 90.74 13.46 7253.72 7212.97 10923.09 -9003.45 532645.74 6046146.49 70°32'13.6213"N 149°43'57.0515"W 11.16 107.116 -0.40 11.16 9193.71 386.92 34.00 65.77 319.52 17125.30 89.72 16.77 7253.60 7212.85 10951.83 -8995.69 532653.34 6046175.27 70°32'13.9040"N 149°43'56.8236"W 11.63 125.369 -3.43 11.12 9223.36 387.06 34.12 65.78 319.55 17155.42 88.28 18.80 7254.13 7213.38 10980.50 -8986.49 532662.38 6046203.99 70°32'14.1861"N 149°43'56.5533"W 8.26 100.427 -4.78 6.74 9253.20 387.19 34.26 65.79 319.58 17185.27 87.97 20.49 7255.11 7214.36 11008.60 -8976.46 532672.25 6046232.14 70°32'14.4626"N 149°43'56.2585"W 5.75 84.248 -1.04 5.66 9282.61 387.32 34.42 65.80 319.62 17218.16 88.40 24.71 7256.15 7215.40 11038.94 -8963.83 532684.71 6046262.55 70°32'14.7611"N 149°43'55.8871"W 12.89 52.43 1.31 12.83 9314.68 387.44 34.61 65.82 319.65 17245.32 88.80 25.23 7256.81 7216.06 11063.56 -8952.37 532696.03 6046287.23 70°32'15.0033"N 149°43'55.5499"W 2.42 70.679 1.47 1.91 9340.91 387.53 34.78 65.83 319.68 17275.24 90.25 29.36 7257.06 7216.31 11090.14 -8938.65 532709.59 6046313.88 70°32'15.2649"N 149°43'55.1463"W 14.63 111.694 4.85 13.80 9369.47 387.63 34.99 65.85 319.72 17305.40 89.88 30.29 7257.03 7216.28 11116.30 -8923.65 532724.44 6046340.13 70°32'15.5224"N 149°43'54.7048"W 3.32 111.888 -1.23 3.08 9397.84 387.71 35.22 65.86 319.75 17338.02 88.80 32.98 7257.40 7216.65 11144.07 -8906.55 532741.39 6046367.99 70°32'15.7957"N 149°43'54.2012"W 8.89 -127.913 -3.31 8.25 9428.16 387.80 35.49 65.88 319.79 17365.38 86.71 30.29 7258.47 7217.72 11167.34 -8892.21 532755.60 6046391.34 70°32'16.0248"N 149°43'53.7792"W 12.44 -79.568 -7.64 -9.83 9453.57 387.87 35.73 65.90 319.83 17395.46 87.21 27.59 7260.07 7219.32 11193.63 -8877.67 532769.98 6046417.70 70°32'16.2834"N 149°43'53.3514"W 9.12 -67.524 1.66 -8.98 9481.98 387.96 36.02 65.92 319.86 17425.29 88.40 24.72 7261.21 7220.46 11220.38 -8864.54 532782.97 6046444.53 70°32'16.5467"N 149°43'52.9649"W 10.41 -70.609 3.99 -9.62 9510.61 388.06 36.31 65.94 319.90 17455.35 89.32 22.11 7261.81 7221.06 11247.96 -8852.59 532794.75 6046472.17 70°32'16.8180"N 149°43'52.6136"W 9.20 -97.327 3.06 -8.68 9539.84 388.17 36.62 65.96 319.93 17485.45 89.08 20.24 7262.23 7221.48 11276.02 -8841.72 532805.47 6046500.29 70°32'17.0942"N 149°43'52.2940"W 6.26 -67.307 -0.80 -6.21 9569.36 388.29 36.93 65.98 319.97 Tie in MPU F-10A to MPU F-10APB1 17511.00 90.08 17.85 7262.42 7221.67 11300.17 -8833.39 532813.67 6046524.48 70°32'17.3318"N 149°43'52.0489"W 10.14 -176.875 3.91 -9.35 9594.59 389.10 36.10 65.96 319.96 Top of Billet 17540.35 85.51 17.60 7263.55 7222.80 11328.10 -8824.46 532822.44 6046552.46 70°32'17.6065"N 149°43'51.7866"W 15.59 -65.6 -15.57 -0.85 9623.65 389.23 36.30 65.96 319.99 17570.34 86.71 14.96 7265.58 7224.83 11356.82 -8816.07 532830.66 6046581.22 70°32'17.8891"N 149°43'51.5403"W 9.65 -70.329 4.00 -8.80 9653.38 389.37 36.51 65.97 320.02 17600.41 88.37 10.34 7266.87 7226.12 11386.12 -8809.50 532837.07 6046610.55 70°32'18.1773"N 149°43'51.3473"W 16.31 -51.232 5.52 -15.36 9683.39 389.52 36.73 65.97 320.05 17629.93 90.58 7.59 7267.14 7226.39 11415.27 -8804.90 532841.51 6046639.73 70°32'18.4641"N 149°43'51.2127"W 11.95 -81.507 7.49 -9.32 9712.89 389.68 36.94 65.98 320.08 17660.83 91.07 4.30 7266.70 7225.95 11446.00 -8801.70 532844.53 6046670.47 70°32'18.7663"N 149°43'51.1194"W 10.76 -116.254 1.59 -10.65 9743.71 389.86 37.17 65.98 320.11 17690.39 89.54 1.20 7266.54 7225.79 11475.52 -8800.28 532845.78 6046700.00 70°32'19.0567"N 149°43'51.0786"W 11.69 78.557 -5.18 -10.49 9773.03 390.04 37.38 65.99 320.14 17720.91 90.18 4.36 7266.62 7225.87 11506.00 -8798.80 532847.09 6046730.48 70°32'19.3564"N 149°43'51.0360"W 10.56 140.621 2.10 10.35 9803.30 390.24 37.61 65.99 320.17 17750.37 88.56 5.69 7266.94 7226.19 11535.34 -8796.22 532849.51 6046759.84 70°32'19.6451"N 149°43'50.9609"W 7.11 71.481 -5.50 4.51 9832.65 390.41 37.84 66.00 320.20 17781.00 89.60 8.79 7267.43 7226.68 11565.72 -8792.36 532853.20 6046790.23 70°32'19.9439"N 149°43'50.8482"W 10.67 99.443 3.40 10.12 9863.23 390.59 38.10 66.01 320.23 17815.69 89.14 11.56 7267.81 7227.06 11599.86 -8786.23 532859.13 6046824.40 70°32'20.2797"N 149°43'50.6686"W 8.09 108.866 -1.33 7.99 9897.92 390.79 38.42 66.02 320.26 17840.20 88.10 14.61 7268.40 7227.65 11623.72 -8780.69 532864.54 6046848.29 70°32'20.5144"N 149°43'50.5058"W 13.14 118.724 -4.24 12.44 9922.38 390.91 38.66 66.03 320.29 17874.38 86.31 17.89 7270.07 7229.32 11656.49 -8771.14 532873.91 6046881.11 70°32'20.8368"N 149°43'50.2253"W 10.92 -5.272 -5.24 9.60 9956.31 391.08 39.01 66.04 320.33 17901.57 89.02 17.64 7271.18 7230.43 11682.36 -8762.85 532882.05 6046907.03 70°32'21.0913"N 149°43'49.9817"W 10.01 57.353 9.97 -0.92 9983.23 391.21 39.31 66.05 320.36 17930.32 90.43 19.84 7271.32 7230.57 11709.59 -8753.61 532891.13 6046934.30 70°32'21.3592"N 149°43'49.7102"W 9.09 -71.382 4.90 7.65 10011.64 391.34 39.64 66.06 320.40 17960.31 91.11 17.82 7270.91 7230.16 11737.97 -8743.94 532900.65 6046962.73 70°32'21.6384"N 149°43'49.4257"W 7.11 -125.518 2.27 -6.74 10041.27 391.48 39.99 66.07 320.43 17991.40 88.49 14.15 7271.02 7230.27 11767.85 -8735.38 532909.04 6046992.65 70°32'21.9324"N 149°43'49.1743"W 14.50 -74.856 -8.43 -11.80 10072.18 391.64 40.35 66.09 320.47 18018.43 89.29 11.20 7271.55 7230.80 11794.21 -8729.45 532914.82 6047019.05 70°32'22.1917"N 149°43'49.0003"W 11.31 -116.164 2.96 -10.91 10099.18 391.78 40.67 66.10 320.50 18051.80 87.54 7.63 7272.47 7231.72 11827.11 -8723.99 532920.09 6047051.98 70°32'22.5153"N 149°43'48.8405"W 11.91 -56.143 -5.24 -10.70 10132.53 391.98 41.05 66.12 320.54 18083.10 89.32 4.98 7273.33 7232.58 11858.21 -8720.56 532923.35 6047083.09 70°32'22.8212"N 149°43'48.7403"W 10.20 -28.316 5.69 -8.47 10163.75 392.17 41.40 66.14 320.57 18110.33 91.38 3.87 7273.16 7232.41 11885.35 -8718.45 532925.30 6047110.24 70°32'23.0882"N 149°43'48.6792"W 8.59 10.454 7.57 -4.08 10190.84 392.35 41.70 66.15 320.60 18140.35 94.03 4.36 7271.74 7230.99 11915.26 -8716.30 532927.28 6047140.16 70°32'23.3823"N 149°43'48.6168"W 8.98 -23.49 8.83 1.63 10220.67 392.54 42.04 66.17 320.63 18170.34 96.59 3.24 7268.97 7228.22 11945.05 -8714.32 532929.10 6047169.96 70°32'23.6754"N 149°43'48.5594"W 9.31 2.267 8.54 -3.73 10250.35 392.74 42.37 66.19 320.66 18201.46 100.32 3.39 7264.39 7223.64 11975.78 -8712.54 532930.70 6047200.69 70°32'23.9775"N 149°43'48.5080"W 12.00 60.957 11.99 0.48 10280.92 392.95 42.71 66.21 320.70 18230.30 101.84 6.21 7258.85 7218.10 12003.98 -8710.18 532932.91 6047228.90 70°32'24.2549"N 149°43'48.4392"W 10.95 86.245 5.27 9.78 10309.10 393.14 43.04 66.23 320.73 18239.21 101.93 7.67 7257.02 7216.27 12012.63 -8709.12 532933.92 6047237.56 70°32'24.3400"N 149°43'48.4084"W 16.07 0 1.01 16.39 10317.81 393.19 43.14 66.24 320.74 18265.00 101.93 7.67 7251.68 7210.93 12037.64 -8705.76 532937.14 6047262.58 70°32'24.5860"N 149°43'48.3099"W 0.00 N/A 0.00 0.00 10343.02 393.35 43.46 66.26 320.77 Projection To TD Page 4 of 4 # Vert Uncert 1sd [ft] 0.00 0.00 Start MD End MD Survey Date [ft] [ft] 28.25 8100.00 10/23/2023 8100.00 16679.83 10/23/2023 16679.83 17944.00 11/5/2023 MD Inclination Azimuth TVD TVDSS North East Grid East Grid North Latitude Longitude DLS Toolface Build Rate Turn Rate Vert Sect Major Semi Minor Semi Vert Semi Minor Azim Comments [ft] [°] [°] [ft] [ft] [ft] [ft] [US ft] [US ft] [°/100ft] [°] [°/100ft] [°/100ft] [ft] [ft] [ft] [ft] [°] 0.00 0.00 54.71 0.00 -40.75 0.00 0.00 541709.47 6035275.21 70°30'26.2499"N 149°39'31.5054"W 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.25 0.00 54.71 28.25 -12.50 0.00 0.00 541709.47 6035275.21 70°30'26.2499"N 149°39'31.5054"W 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.05 54.71 100.00 59.25 0.02 0.03 541709.50 6035275.23 70°30'26.2501"N 149°39'31.5046"W 0.07 -106.296 0.07 0.00 0.02 0.20 0.16 1.32 144.71 200.00 0.06 1.53 200.00 159.25 0.10 0.06 541709.53 6035275.31 70°30'26.2508"N 149°39'31.5035"W 0.05 -93.237 0.01 -53.18 0.11 0.51 0.42 1.33 308.73 300.00 0.08 316.78 300.00 259.25 0.20 0.02 541709.49 6035275.41 70°30'26.2518"N 149°39'31.5049"W 0.06 -81.052 0.02 -44.75 0.20 0.80 0.68 1.36 286.15 400.00 0.15 267.52 400.00 359.25 0.24 -0.16 541709.31 6035275.45 70°30'26.2523"N 149°39'31.5102"W 0.12 -16.899 0.07 -49.26 0.21 1.06 0.94 1.40 263.53 500.00 0.39 257.04 500.00 459.25 0.16 -0.62 541708.84 6035275.37 70°30'26.2515"N 149°39'31.5238"W 0.24 35.834 0.24 -10.48 0.05 1.31 1.20 1.44 239.96 600.00 1.28 282.60 599.99 559.24 0.33 -2.05 541707.42 6035275.53 70°30'26.2531"N 149°39'31.5656"W 0.94 24.666 0.89 25.56 -0.03 1.62 1.48 1.50 220.91 650.00 1.89 290.85 649.97 609.22 0.74 -3.36 541706.10 6035275.94 70°30'26.2572"N 149°39'31.6044"W 1.30 17.939 1.22 16.50 0.15 1.80 1.62 1.53 216.12 700.00 2.70 296.34 699.93 659.18 1.56 -5.19 541704.27 6035276.74 70°30'26.2652"N 149°39'31.6582"W 1.68 28.525 1.62 10.98 0.64 1.96 1.75 1.56 214.73 750.00 3.46 302.99 749.85 709.10 2.90 -7.51 541701.95 6035278.07 70°30'26.2785"N 149°39'31.7265"W 1.68 11.167 1.52 13.30 1.56 2.13 1.89 1.59 214.29 800.00 3.72 303.78 799.76 759.01 4.63 -10.12 541699.32 6035279.78 70°30'26.2954"N 149°39'31.8035"W 0.53 30.279 0.52 1.58 2.80 2.30 2.02 1.63 214.48 850.00 4.26 307.94 849.64 808.89 6.67 -12.94 541696.50 6035281.81 70°30'26.3155"N 149°39'31.8863"W 1.22 14.022 1.08 8.32 4.32 2.46 2.15 1.67 34.82 900.00 5.33 310.80 899.46 858.71 9.33 -16.16 541693.26 6035284.45 70°30'26.3417"N 149°39'31.9812"W 2.19 18.463 2.14 5.72 6.38 2.63 2.28 1.70 35.41 950.00 7.27 315.85 949.16 908.41 13.12 -20.12 541689.28 6035288.21 70°30'26.3789"N 149°39'32.0979"W 4.03 6.945 3.88 10.10 9.43 2.81 2.42 1.74 36.53 1000.00 8.44 316.82 998.69 957.94 18.06 -24.83 541684.54 6035293.13 70°30'26.4275"N 149°39'32.2368"W 2.35 1.939 2.34 1.94 13.48 3.01 2.56 1.79 37.96 1050.00 10.16 317.15 1048.03 1007.28 23.97 -30.35 541678.99 6035299.01 70°30'26.4857"N 149°39'32.3991"W 3.44 -6.878 3.44 0.66 18.34 3.19 2.69 1.8338.82 1100.00 11.12 316.55 1097.17 1056.42 30.71 -36.66 541672.64 6035305.71 70°30'26.5519"N 149°39'32.5850"W 1.93 10.448 1.92 -1.20 23.88 3.37 2.83 1.88 39.61 1150.00 11.94 317.28 1146.16 1105.41 38.01 -43.49 541665.78 6035312.97 70°30'26.6237"N 149°39'32.7860"W 1.67 26.728 1.64 1.46 29.88 3.53 2.97 1.9239.97 1200.00 12.64 318.88 1195.01 1154.26 45.93 -50.59 541658.63 6035320.85 70°30'26.7016"N 149°39'32.9953"W 1.56 0.863 1.40 3.20 36.45 3.69 3.11 1.97 40.28 1250.00 13.41 318.93 1243.72 1202.97 54.42 -58.00 541651.17 6035329.30 70°30'26.7851"N 149°39'33.2135"W 1.54 7.378 1.54 0.10 43.52 3.85 3.25 2.02 40.56 1300.00 14.41 319.45 1292.26 1251.51 63.52 -65.85 541643.27 6035338.35 70°30'26.8746"N 149°39'33.4448"W 2.02 2.117 2.00 1.04 51.12 4.01 3.40 2.07 40.83 1350.00 15.73 319.63 1340.54 1299.79 73.41 -74.29 541634.78 6035348.20 70°30'26.9719"N 149°39'33.6932"W 2.64 4.138 2.64 0.36 59.40 4.17 3.55 2.12 41.13 1400.00 17.52 320.06 1388.44 1347.69 84.35 -83.51 541625.50 6035359.08 70°30'27.0794"N 149°39'33.9648"W 3.59 -26.836 3.58 0.86 68.56 4.34 3.70 2.18 41.47 1450.00 17.78 319.63 1436.09 1395.34 95.93 -93.29 541615.66 6035370.61 70°30'27.1934"N 149°39'34.2527"W 0.58 81.938 0.52 -0.86 78.28 4.51 3.86 2.24 41.77 1500.00 17.80 320.08 1483.70 1442.95 107.61 -103.14 541605.74 6035382.23 70°30'27.3082"N 149°39'34.5428"W 0.28 -7.789 0.04 0.90 88.07 4.66 4.01 2.30 41.76 1550.00 18.74 319.68 1531.18 1490.43 119.60 -113.24 541595.57 6035394.16 70°30'27.4261"N 149°39'34.8403"W 1.90 2.036 1.88 -0.80 98.12 4.81 4.17 2.36 41.73 1600.00 19.99 319.81 1578.35 1537.60 132.25 -123.95 541584.79 6035406.75 70°30'27.5505"N 149°39'35.1558"W 2.50 2.971 2.50 0.26 108.72 4.97 4.34 2.42 41.73 1650.00 21.10 319.97 1625.17 1584.42 145.67 -135.25 541573.41 6035420.10 70°30'27.6825"N 149°39'35.4887"W 2.22 11.933 2.22 0.32 119.97 5.13 4.51 2.48 41.71 1700.00 22.40 320.69 1671.61 1630.86 159.93 -147.08 541561.51 6035434.30 70°30'27.8228"N 149°39'35.8370"W 2.65 12.577 2.60 1.44 131.96 5.29 4.68 2.55 41.59 1750.00 23.25 321.17 1717.69 1676.94 174.99 -159.30 541549.20 6035449.29 70°30'27.9709"N 149°39'36.1970"W 1.74 -18.292 1.70 0.96 144.67 5.44 4.862.6241.38 1800.00 23.80 320.72 1763.54 1722.79 190.49 -171.88 541536.54 6035464.71 70°30'28.1233"N 149°39'36.5674"W 1.16 14.834 1.10 -0.90 157.75 5.59 5.042.6940.98 1850.00 24.25 321.01 1809.21 1768.46 206.28 -184.72 541523.61 6035480.43 70°30'28.2786"N 149°39'36.9457"W 0.93 -108.735 0.90 0.58 171.07 5.74 5.23 2.76 40.42 1900.00 24.18 320.50 1854.81 1814.06 222.16 -197.70 541510.55 6035496.24 70°30'28.4347"N 149°39'37.3279"W 0.44 6.682 -0.14 -1.02 184.46 5.89 5.412.8339.69 1950.00 25.62 320.89 1900.16 1859.41 238.45 -211.03 541497.12 6035512.45 70°30'28.5950"N 149°39'37.7206"W 2.90 -2.495 2.88 0.78 198.18 6.04 5.61 2.90 38.77 2000.00 27.53 320.71 1944.87 1904.12 255.78 -225.17 541482.89 6035529.70 70°30'28.7654"N 149°39'38.1370"W 3.82 3.251 3.82 -0.36 212.80 6.19 5.80 2.98 37.74 2050.00 29.07 320.89 1988.89 1948.14 274.15 -240.15 541467.81 6035547.98 70°30'28.9461"N 149°39'38.5782"W 3.08 -5.73 3.08 0.36 228.29 6.35 6.01 3.07 36.27 2100.00 30.86 320.54 2032.21 1991.46 293.48 -255.96 541451.89 6035567.22 70°30'29.1361"N 149°39'39.0439"W 3.60 0.456 3.58 -0.70 244.58 6.51 6.22 3.15 33.64 2150.00 32.91 320.57 2074.66 2033.91 313.88 -272.74 541435.00 6035587.52 70°30'29.3367"N 149°39'39.5381"W 4.10 1.417 4.10 0.06 261.75 6.66 6.43 3.25 29.22 2200.00 33.81 320.61 2116.42 2075.67 335.12 -290.20 541417.42 6035608.66 70°30'29.5456"N 149°39'40.0522"W 1.80 14.845 1.80 0.08 279.64 6.82 6.64 3.34 20.82 2250.00 35.80 321.51 2157.48 2116.73 357.32 -308.13 541399.37 6035630.76 70°30'29.7639"N 149°39'40.5804"W 4.11 -24.548 3.98 1.80 298.38 7.00 6.843.434.16 2300.00 37.03 320.58 2197.71 2156.96 380.40 -326.79 541380.58 6035653.73 70°30'29.9909"N 149°39'41.1301"W 2.70 1.845 2.46 -1.86 317.87 7.20 7.02 3.54 347.25 2350.00 38.78 320.67 2237.16 2196.41 404.14 -346.28 541360.96 6035677.36 70°30'30.2244"N 149°39'41.7040"W 3.50 8.905 3.50 0.18 337.87 7.44 7.16 3.63 336.76 2400.00 39.76 320.91 2275.87 2235.12 428.66 -366.28 541340.82 6035701.77 70°30'30.4656"N 149°39'42.2933"W 1.98 8.534 1.96 0.48 358.55 7.69 7.30 3.74 331.47 2450.00 41.62 321.33 2313.78 2273.03 454.04 -386.74 541320.22 6035727.03 70°30'30.7151"N 149°39'42.8959"W 3.76 -28.583 3.72 0.84 379.99 7.95 7.43 3.84 328.46 2500.00 42.49 320.63 2350.91 2310.16 480.06 -407.83 541298.99 6035752.92 70°30'30.9710"N 149°39'43.5170"W 1.98 13.793 1.74 -1.40 401.95 8.21 7.56 3.95 326.60 2550.00 44.02 321.17 2387.32 2346.57 506.65 -429.44 541277.24 6035779.39 70°30'31.2325"N 149°39'44.1533"W 3.15 2.874 3.06 1.08 424.38 8.49 7.67 4.05 325.33 2600.00 45.15 321.25 2422.93 2382.18 534.01 -451.42 541255.10 6035806.62 70°30'31.5015"N 149°39'44.8010"W 2.26 -12.388 2.26 0.16 447.50 8.78 7.79 4.16 324.47 2650.00 46.37 320.88 2457.81 2417.06 561.87 -473.94 541232.43 6035834.35 70°30'31.7755"N 149°39'45.4641"W 2.50 27.468 2.44 -0.74 471.04 9.07 7.90 4.27 323.83 2700.00 47.19 321.46 2492.05 2451.30 590.25 -496.78 541209.43 6035862.61 70°30'32.0547"N 149°39'46.1370"W 1.85 -19.368 1.64 1.16 495.02 9.36 8.01 4.39 323.35 Actual Wellpath Geographic Report - including Position Uncertainty Report by Baker Hughes Operator Area Wellpath Wellbore last revised Sidetrack from User Calculation method Field Facility Slot Well Wellbore MPU F Pad MPU F-10 MPU F-10APB1 MPU F-10APB1 MPU F-10APB1_awp 11/05/2023 MPU F-10 at 16679.83 MD Tuftscod Minimum curvature 40.75 ft E 0.00 ft N 0.00 ft Magnetic North is 14.53 degrees East of True North 2.00Std Dev WA_ANC_Defn Projection System North Reference Scale Convergence at Slot Horizontal Reference Point Vertical Reference Point MD Reference Point Field Vertical Reference Rig on MPU F-10 (RT) To Mean Sea Level Section Origin X Section Origin Y 11/5/2023 at 10:32:01 AM using WellArchitect 6.0 Hilcorp Alaska, LLC North Slope, Alaska Milne Point NAD27 / TM Alaska SP, Zone 4 (5004), US feet True 0.999902 0.32 East Slot Rig on MPU F-10 (RT) Rig on MPU F-10 (RT) Mean Sea Level 10.00° included 50-029-22679-71-00 Local East Grid North Longitude Section Azimuth Surface Position Uncertainty API # Declination Ellipse Confidence Limit Database Grid East [US ft] 541709.47 541761.56 558058.04 Slot Location Facility Reference Pt Field Reference Pt Local North [ft] -72.80 Horiz Uncert 1sd [ft] 0.00 0.00 [US ft] 6035275.21 6035348.30 6027347.71 Latitude 70°30'26.2499"N 70°30'26.9659"N 70°29'7.2002"N Positional Uncertainty Model Log Name / Comment Wellbore 149°39'31.5054"W 149°39'29.9591"W 149°31'31.8215"W [ft] -52.51 BH CoilTrak (2019) (Standard) MPU F-10APB1 <Coiltrak MWD> 16698-17944 MPU F-10APB1 BH Generic gyro - continuous (Drillpipe) MPU F-10 <GYRO-CT_DRILL PIPE> 100.00 - 8100.00 MPU F-10 OWSG MWD rev2 - Standard MPU F-10 <MWD> 8132.64 - 16994.86 MPU F-10 Page 1 of 4 # 2750.00 48.71 320.75 2525.54 2484.79 619.15 -520.09 541185.96 6035891.37 70°30'32.3388"N 149°39'46.8237"W 3.22 9.929 3.04 -1.42 519.43 9.67 8.12 4.50 322.97 2800.00 49.58 320.95 2558.25 2517.50 648.48 -543.97 541161.92 6035920.56 70°30'32.6272"N 149°39'47.5270"W 1.77 -53.226 1.74 0.40 544.16 9.98 8.23 4.62 322.65 2850.00 50.52 319.34 2590.36 2549.61 677.90 -568.54 541137.19 6035949.84 70°30'32.9166"N 149°39'48.2505"W 3.10 4.913 1.88 -3.22 568.87 10.30 8.33 4.73 322.35 2900.00 51.80 319.48 2621.71 2580.96 707.47 -593.87 541111.69 6035979.26 70°30'33.2074"N 149°39'48.9969"W 2.57 -39.552 2.56 0.28 593.60 10.62 8.43 4.85 322.04 2950.00 52.67 318.58 2652.33 2611.58 737.31 -619.79 541085.61 6036008.96 70°30'33.5009"N 149°39'49.7603"W 2.25 33.538 1.74 -1.80 618.49 10.95 8.53 4.98 321.77 3000.00 53.62 319.36 2682.32 2641.57 767.49 -646.05 541059.18 6036038.99 70°30'33.7977"N 149°39'50.5339"W 2.27 -31.498 1.90 1.56 643.65 11.28 8.62 5.10 321.52 3050.00 54.23 318.90 2711.77 2671.02 798.05 -672.50 541032.57 6036069.39 70°30'34.0982"N 149°39'51.3128"W 1.43 30.535 1.22 -0.92 669.15 11.62 8.72 5.22 321.32 3100.00 55.32 319.68 2740.61 2699.86 829.01 -699.13 541005.76 6036100.20 70°30'34.4027"N 149°39'52.0975"W 2.53 -51.44 2.18 1.56 695.02 11.97 8.81 5.35 321.16 3150.00 55.71 319.09 2768.92 2728.17 860.30 -725.96 540978.76 6036131.33 70°30'34.7103"N 149°39'52.8878"W 1.25 11.798 0.78 -1.18 721.17 12.32 8.90 5.48 321.02 3200.00 57.57 319.55 2796.41 2755.66 891.97 -753.18 540951.37 6036162.85 70°30'35.0217"N 149°39'53.6896"W 3.80 -36.024 3.72 0.92 747.63 12.67 8.99 5.61 320.90 3250.00 58.63 318.65 2822.83 2782.08 924.05 -780.98 540923.40 6036194.77 70°30'35.3372"N 149°39'54.5083"W 2.61 21.965 2.12 -1.80 774.40 13.03 9.08 5.75 320.78 3300.00 60.71 319.61 2848.08 2807.33 956.69 -809.21 540894.98 6036227.24 70°30'35.6582"N 149°39'55.3400"W 4.48 -28.662 4.16 1.92 801.63 13.40 9.16 5.89 320.67 3350.00 61.89 318.88 2872.09 2831.34 989.91 -837.84 540866.17 6036260.30 70°30'35.9848"N 149°39'56.1835"W 2.69 16.915 2.36 -1.46 829.38 13.78 9.24 6.04 320.57 3400.00 63.87 319.55 2894.88 2854.13 1023.60 -866.91 540836.92 6036293.83 70°30'36.3162"N 149°39'57.0397"W 4.14 -40.322 3.96 1.34 857.51 14.16 9.31 6.18 320.49 3450.00 64.93 318.56 2916.49 2875.74 1057.66 -896.46 540807.18 6036327.71 70°30'36.6511"N 149°39'57.9103"W 2.77 8.459 2.12 -1.98 885.92 14.54 9.38 6.33 320.41 3500.00 66.91 318.88 2936.89 2896.14 1091.96 -926.57 540776.87 6036361.84 70°30'36.9884"N 149°39'58.7974"W 4.00 -5.943 3.96 0.64 914.48 14.93 9.45 6.47 320.31 3550.00 67.71 318.79 2956.17 2915.42 1126.69 -956.94 540746.32 6036396.40 70°30'37.3299"N 149°39'59.6919"W 1.61 -21.684 1.60 -0.18 943.40 15.33 9.51 6.62 320.24 3600.00 69.24 318.14 2974.52 2933.77 1161.51 -987.78 540715.29 6036431.04 70°30'37.6723"N 149°40'0.6005"W 3.29 -57.999 3.06 -1.30 972.33 15.73 9.57 6.76 320.15 3650.00 70.17 316.57 2991.86 2951.11 1196.00 -1019.55 540683.33 6036465.35 70°30'38.0115"N 149°40'1.5364"W 3.48 62.017 1.86 -3.14 1000.78 16.14 9.63 6.91 320.03 3700.00 72.11 320.33 3008.03 2967.28 1231.40 -1050.92 540651.76 6036500.57 70°30'38.3596"N 149°40'2.4605"W 8.10 39.986 3.88 7.52 1030.21 16.56 9.68 7.05 319.96 3800.00 73.07 321.17 3037.95 2997.20 1305.30 -1111.29 540590.99 6036574.12 70°30'39.0862"N 149°40'4.2390"W 1.25 -86.209 0.96 0.84 1092.49 17.45 9.78 7.37 319.99 3900.00 73.20 319.26 3066.96 3026.21 1378.83 -1172.52 540529.34 6036647.30 70°30'39.8094"N 149°40'6.0431"W 1.83 -108.6 0.13 -1.91 1154.28 18.30 9.88 7.67 319.99 4000.00 72.30 316.39 3096.62 3055.87 1449.60 -1236.63 540464.85 6036717.70 70°30'40.5053"N 149°40'7.9318"W 2.88 90.494 -0.90 -2.87 1212.84 19.15 9.98 7.96 319.84 4100.00 72.30 319.64 3127.03 3086.28 1520.40 -1300.34 540400.74 6036788.14 70°30'41.2015"N 149°40'9.8090"W 3.10 -13.648 0.00 3.25 1271.50 20.03 10.09 8.26 319.73 4200.00 72.93 319.48 3156.91 3116.16 1593.03 -1362.25 540338.44 6036860.41 70°30'41.9157"N 149°40'11.6328"W 0.65 69.832 0.63 -0.16 1332.28 20.96 10.20 8.56 319.71 4300.00 73.22 320.30 3186.03 3145.28 1666.20 -1423.88 540276.40 6036933.23 70°30'42.6351"N 149°40'13.4487"W 0.84 -91.406 0.29 0.82 1393.63 21.83 10.30 8.87 319.71 4400.00 73.18 318.10 3214.93 3174.18 1738.67 -1486.43 540213.45 6037005.33 70°30'43.3477"N 149°40'15.2917"W 2.11 99.672 -0.04 -2.20 1454.14 22.72 10.41 9.18 319.67 4500.00 72.73 320.99 3244.25 3203.50 1811.40 -1548.46 540151.02 6037077.71 70°30'44.0629"N 149°40'17.1193"W 2.80 -83.248 -0.45 2.89 1515.00 23.63 10.52 9.49 319.66 4600.00 73.11 317.85 3273.63 3232.88 1883.99 -1610.63 540088.45 6037149.94 70°30'44.7767"N 149°40'18.9513"W 3.03 149.674 0.38 -3.14 1575.69 24.56 10.63 9.80 319.65 4700.00 72.07 318.49 3303.55 3262.80 1955.09 -1674.27 540024.42 6037220.67 70°30'45.4757"N 149°40'20.8264"W 1.21 85.18 -1.04 0.64 1634.65 25.47 10.75 10.12 319.58 4800.00 72.17 319.69 3334.25 3293.50 2027.01 -1736.59 539961.70 6037292.24 70°30'46.1829"N 149°40'22.6628"W 1.15 34.279 0.10 1.20 1694.66 26.38 10.87 10.45 319.56 4900.00 72.52 319.94 3364.58 3323.83 2099.81 -1798.08 539899.81 6037364.68 70°30'46.8987"N 149°40'24.4746"W 0.42 46.914 0.35 0.25 1755.68 27.30 10.98 10.78 319.56 5000.00 72.86 320.32 3394.33 3353.58 2173.08 -1859.28 539838.21 6037437.60 70°30'47.6192"N 149°40'26.2781"W 0.50 -144.401 0.34 0.38 1817.21 28.22 11.10 11.10 319.58 5100.00 72.70 320.20 3423.94 3383.19 2246.53 -1920.35 539776.74 6037510.70 70°30'48.3414"N 149°40'28.0775"W 0.20 -127.993 -0.16 -0.12 1878.94 29.15 11.22 11.43 319.60 5200.00 72.41 319.81 3453.92 3413.17 2319.62 -1981.66 539715.02 6037583.43 70°30'49.0600"N 149°40'29.8844"W 0.47 -143.149 -0.29 -0.39 1940.27 30.09 11.34 11.75 319.61 5300.00 71.84 319.36 3484.61 3443.86 2392.08 -2043.36 539652.92 6037655.54 70°30'49.7725"N 149°40'31.7027"W 0.71 106.565 -0.57 -0.45 2000.91 31.03 11.47 12.08 319.61 5400.00 71.07 322.17 3516.42 3475.67 2465.50 -2103.32 539592.55 6037728.62 70°30'50.4944"N 149°40'33.4698"W 2.77 -80.858 -0.77 2.81 2062.81 31.99 11.60 12.42 319.64 5500.00 71.53 319.30 3548.49 3507.74 2538.82 -2163.27 539532.20 6037801.60 70°30'51.2153"N 149°40'35.2364"W 2.76 83.527 0.46 -2.87 2124.61 32.9611.7312.76319.68 5600.00 71.59 319.85 3580.12 3539.37 2611.04 -2224.78 539470.29 6037873.46 70°30'51.9254"N 149°40'37.0493"W 0.53 8.251 0.06 0.55 2185.04 33.92 11.87 13.09 319.67 5700.00 73.91 320.20 3609.77 3569.02 2684.22 -2286.13 539408.53 6037946.29 70°30'52.6449"N 149°40'38.8574"W 2.34 84.954 2.32 0.35 2246.46 34.89 11.99 13.44 319.68 5800.00 73.96 320.78 3637.45 3596.70 2758.36 -2347.27 539346.99 6038020.07 70°30'53.3739"N 149°40'40.6593"W 0.56 113.192 0.05 0.58 2308.86 35.8712.1213.82319.70 5900.00 72.57 324.25 3666.25 3625.50 2834.33 -2405.55 539288.29 6038095.71 70°30'54.1208"N 149°40'42.3768"W 3.60 -104.71 -1.39 3.47 2373.55 36.87 12.25 14.16 319.79 6000.00 71.87 321.36 3696.79 3656.04 2910.18 -2463.10 539230.32 6038171.22 70°30'54.8666"N 149°40'44.0732"W 2.84 -112.507 -0.70 -2.89 2438.25 37.89 12.38 14.52 319.88 6100.00 70.45 317.63 3729.09 3688.34 2982.13 -2524.55 539168.47 6038242.82 70°30'55.5740"N 149°40'45.8843"W 3.80 72.411 -1.42 -3.73 2498.44 38.87 12.52 14.86 319.87 6200.00 71.23 320.17 3761.92 3721.17 3053.31 -2586.63 539106.00 6038313.64 70°30'56.2738"N 149°40'47.7142"W 2.52 140.599 0.78 2.54 2557.76 39.8712.6715.21319.84 6300.00 68.57 322.53 3796.28 3755.53 3126.62 -2645.29 539046.94 6038386.62 70°30'56.9946"N 149°40'49.4431"W 3.46 55.361 -2.66 2.36 2619.77 40.8812.8215.57319.88 6400.00 69.16 323.44 3832.34 3791.59 3201.10 -2701.44 538990.37 6038460.77 70°30'57.7269"N 149°40'51.0983"W 1.03 -127.901 0.59 0.91 2683.37 41.88 12.99 15.96 319.96 6500.00 68.87 323.04 3868.15 3827.40 3275.90 -2757.31 538934.08 6038535.25 70°30'58.4623"N 149°40'52.7454"W 0.47 65.42 -0.29 -0.40 2747.33 42.8813.1416.29320.04 6600.00 69.24 323.90 3903.90 3863.15 3350.95 -2812.90 538878.08 6038609.98 70°30'59.2002"N 149°40'54.3841"W 0.88 -2.651 0.37 0.86 2811.58 43.88 13.30 16.63 320.12 6700.00 71.91 323.77 3937.16 3896.41 3427.08 -2868.55 538822.01 6038685.78 70°30'59.9487"N 149°40'56.0245"W 2.67 10.384 2.67 -0.13 2876.89 44.9013.4516.99320.21 6800.00 73.48 324.07 3966.90 3926.15 3504.23 -2924.77 538765.36 6038762.62 70°31'0.7073"N 149°40'57.6820"W 1.60 141.167 1.57 0.30 2943.12 45.93 13.59 17.38 320.30 6900.00 72.51 324.89 3996.15 3955.40 3582.06 -2980.33 538709.37 6038840.13 70°31'1.4725"N 149°40'59.3199"W 1.25 -76.724 -0.97 0.82 3010.12 46.9713.7317.74320.39 7000.00 73.40 321.11 4025.47 3984.72 3658.40 -3037.86 538651.42 6038916.13 70°31'2.2230"N 149°41'1.0160"W 3.72 125.865 0.89 -3.78 3075.30 48.02 13.87 18.08 320.45 7100.00 71.92 323.28 4055.27 4014.52 3733.81 -3096.38 538592.49 6038991.20 70°31'2.9644"N 149°41'2.7410"W 2.55 -84.829 -1.48 2.17 3139.40 49.08 14.02 18.44 320.49 7200.00 72.07 321.62 4086.19 4045.44 3809.20 -3154.34 538534.12 6039066.26 70°31'3.7056"N 149°41'4.4497"W 1.59 -1.153 0.15 -1.66 3203.59 50.14 14.16 18.79 320.54 7300.00 74.95 321.56 4114.57 4073.82 3884.33 -3213.90 538474.13 6039141.05 70°31'4.4442"N 149°41'6.2058"W 2.88 139.541 2.88 -0.06 3267.23 51.21 14.30 19.15 320.56 7400.00 74.69 321.79 4140.75 4100.00 3960.04 -3273.75 538413.87 6039216.42 70°31'5.1886"N 149°41'7.9703"W 0.34 62.418 -0.26 0.23 3331.40 52.29 14.44 19.54 320.58 7500.00 75.32 323.03 4166.63 4125.88 4036.58 -3332.67 538354.52 6039292.62 70°31'5.9411"N 149°41'9.7075"W 1.35 147.731 0.63 1.24 3396.55 53.38 14.58 19.89 320.62 7600.00 74.36 323.66 4192.78 4152.03 4114.01 -3390.29 538296.47 6039369.71 70°31'6.7023"N 149°41'11.4064"W 1.14 -116.238 -0.96 0.63 3462.79 54.48 14.71 20.23 320.68 7700.00 73.60 322.04 4220.38 4179.63 4190.62 -3448.33 538238.01 6039445.99 70°31'7.4555"N 149°41'13.1177"W 1.73 -27.116 -0.76 -1.62 3528.16 55.58 14.85 20.58 320.72 7800.00 73.75 321.96 4248.49 4207.74 4266.25 -3507.42 538178.51 6039521.27 70°31'8.1989"N 149°41'14.8598"W 0.17 -110.556 0.15 -0.08 3592.38 56.68 14.99 20.93 320.75 7900.00 72.67 318.88 4277.38 4236.63 4340.03 -3568.40 538117.12 6039594.70 70°31'8.9243"N 149°41'16.6579"W 3.14 22.292 -1.08 -3.08 3654.45 57.7915.1421.28320.74 8000.00 73.63 319.29 4306.37 4265.62 4412.35 -3631.08 538054.04 6039666.66 70°31'9.6353"N 149°41'18.5060"W 1.04 -39.387 0.96 0.41 3714.79 58.90 15.29 21.63 320.71 8100.00 74.63 318.44 4333.71 4292.96 4484.79 -3694.36 537990.36 6039738.74 70°31'10.3474"N 149°41'20.3717"W 1.29 109.868 1.00 -0.85 3775.14 60.03 15.43 21.98 320.67 8132.64 73.69 321.20 4342.62 4301.87 4508.78 -3714.62 537969.97 6039762.61 70°31'10.5832"N 149°41'20.9690"W 8.63 -148.562 -2.88 8.46 3795.24 60.22 16.95 21.73 320.69 8227.38 73.08 320.81 4369.71 4328.96 4579.34 -3771.74 537912.46 6039832.84 70°31'11.2768"N 149°41'22.6535"W 0.76 -72.063 -0.64 -0.41 3854.81 60.43 17.03 21.75 320.69 8323.02 73.27 320.20 4397.39 4356.64 4649.98 -3829.97 537853.84 6039903.15 70°31'11.9713"N 149°41'24.3703"W 0.64 -46.862 0.20 -0.64 3914.27 60.96 17.11 21.79 320.69 8418.33 73.63 319.80 4424.54 4383.79 4719.97 -3888.69 537794.73 6039972.80 70°31'12.6593"N 149°41'26.1020"W 0.55 66.399 0.38 -0.42 3973.00 61.7917.2021.86320.68 8513.28 73.87 320.37 4451.11 4410.36 4789.88 -3947.18 537735.85 6040042.38 70°31'13.3466"N 149°41'27.8267"W 0.63 -64.176 0.25 0.60 4031.69 62.9217.2921.95320.67 8562.08 74.31 319.43 4464.49 4423.74 4825.78 -3977.41 537705.43 6040078.10 70°31'13.6995"N 149°41'28.7181"W 2.06 148.105 0.90 -1.93 4061.80 63.61 17.34 22.00 320.65 8683.86 74.14 319.54 4497.60 4456.85 4914.88 -4053.55 537628.80 6040166.76 70°31'14.5753"N 149°41'30.9632"W 0.16 -64.358 -0.14 0.09 4136.32 65.64 17.46 22.16 320.60 8774.69 75.55 316.55 4521.35 4480.60 4980.06 -4112.15 537569.83 6040231.61 70°31'15.2160"N 149°41'32.6915"W 3.54 90.062 1.55 -3.29 4190.33 67.4517.5622.30320.51 8869.24 75.55 317.05 4544.94 4504.19 5046.80 -4174.83 537506.79 6040297.99 70°31'15.8721"N 149°41'34.5397"W 0.51 83.228 0.00 0.53 4245.18 69.59 17.67 22.46 320.37 8963.60 75.66 317.99 4568.40 4527.65 5114.21 -4236.55 537444.70 6040365.04 70°31'16.5347"N 149°41'36.3598"W 0.97 -89.503 0.12 1.00 4300.84 71.9317.7822.65320.23 9059.13 75.67 317.03 4592.05 4551.30 5182.46 -4299.07 537381.80 6040432.93 70°31'17.2055"N 149°41'38.2034"W 0.97 -136.202 0.01 -1.00 4357.20 74.50 17.89 22.86 320.10 9153.15 74.14 315.50 4616.54 4575.79 5248.05 -4361.82 537318.69 6040498.16 70°31'17.8502"N 149°41'40.0538"W 2.26 -39.845 -1.63 -1.63 4410.89 77.21 18.01 23.09 319.91 9248.25 74.29 315.37 4642.41 4601.66 5313.25 -4426.04 537254.12 6040562.99 70°31'18.4910"N 149°41'41.9475"W 0.21 -98.144 0.16 -0.14 4463.95 80.12 18.14 23.33 319.70 9343.16 74.09 313.88 4668.27 4627.52 5377.39 -4491.03 537188.77 6040626.77 70°31'19.1215"N 149°41'43.8640"W 1.53 -176.408 -0.21 -1.57 4515.84 83.17 18.28 23.60 319.46 9437.88 72.57 313.78 4695.44 4654.69 5440.23 -4556.48 537122.97 6040689.23 70°31'19.7391"N 149°41'45.7943"W 1.61 104.183 -1.60 -0.11 4566.36 86.34 18.43 23.88 319.19 9533.20 72.36 314.66 4724.16 4683.41 5503.62 -4621.62 537057.49 6040752.24 70°31'20.3621"N 149°41'47.7152"W 0.91 106.458 -0.22 0.92 4617.47 89.61 18.58 24.17 318.95 9626.79 72.01 315.92 4752.79 4712.04 5566.94 -4684.31 536994.45 6040815.21 70°31'20.9845"N 149°41'49.5638"W 1.34 -101.611 -0.37 1.35 4668.94 92.91 18.73 24.48 318.76 9720.12 71.74 314.51 4781.83 4741.08 5629.89 -4746.79 536931.63 6040877.80 70°31'21.6032"N 149°41'51.4065"W 1.46 65.391 -0.29 -1.51 4720.09 96.27 18.88 24.80 318.59 9816.07 72.49 316.21 4811.30 4770.55 5694.86 -4810.94 536867.11 6040942.40 70°31'22.2418"N 149°41'53.2986"W 1.86 56.776 0.78 1.77 4772.93 99.81 19.03 25.14 318.42 9910.67 72.54 316.29 4839.72 4798.97 5760.04 -4873.34 536804.36 6041007.23 70°31'22.8824"N 149°41'55.1388"W 0.10 82.877 0.05 0.08 4826.29 103.37 19.18 25.49 318.30 10004.81 72.79 318.30 4867.77 4827.02 5826.07 -4934.28 536743.05 6041072.91 70°31'23.5314"N 149°41'56.9363"W 2.06 -158.44 0.27 2.14 4880.73 106.96 19.33 25.85 318.23 10099.86 72.38 318.13 4896.22 4855.47 5893.70 -4994.71 536682.25 6041140.19 70°31'24.1961"N 149°41'58.7188"W 0.46 63.869 -0.43 -0.18 4936.84 110.61 19.47 26.23 318.19 10194.92 72.53 318.45 4924.88 4884.13 5961.36 -5055.02 536621.57 6041207.50 70°31'24.8611"N 149°42'0.4976"W 0.36 80.63 0.16 0.34 4993.00 114.31 19.61 26.62 318.16 10289.26 72.56 318.64 4953.17 4912.42 6028.81 -5114.60 536561.62 6041274.61 70°31'25.5241"N 149°42'2.2551"W 0.19 45.868 0.03 0.20 5049.08 118.02 19.75 27.03 318.15 10382.70 72.95 319.06 4980.88 4940.13 6096.01 -5173.32 536502.52 6041341.47 70°31'26.1845"N 149°42'3.9872"W 0.60 -92.517 0.42 0.45 5105.06 121.74 19.89 27.43 318.14 10477.92 72.93 318.57 5008.81 4968.06 6164.52 -5233.26 536442.20 6041409.63 70°31'26.8579"N 149°42'5.7554"W 0.49 -28.263 -0.02 -0.51 5162.12 125.57 20.04 27.86 318.14 Page 2 of 4 # 10572.39 73.34 318.34 5036.22 4995.47 6232.18 -5293.22 536381.87 6041476.95 70°31'27.5229"N 149°42'7.5241"W 0.49 80.1 0.43 -0.24 5218.34 129.42 20.19 28.30 318.13 10665.25 73.60 319.86 5062.64 5021.89 6299.47 -5351.51 536323.22 6041543.90 70°31'28.1842"N 149°42'9.2435"W 1.59 -125.688 0.28 1.64 5274.48 133.23 20.33 28.74 318.14 10759.03 73.38 319.54 5089.29 5048.54 6368.04 -5409.66 536264.68 6041612.14 70°31'28.8582"N 149°42'10.9591"W 0.40 -86.128 -0.23 -0.34 5331.92 137.09 20.48 29.19 318.16 10854.00 73.43 318.79 5116.41 5075.66 6436.90 -5469.17 536204.79 6041680.66 70°31'29.5350"N 149°42'12.7148"W 0.76 -88.767 0.05 -0.79 5389.40 141.04 20.63 29.66 318.18 10947.47 73.45 317.91 5143.06 5102.31 6503.85 -5528.71 536144.88 6041747.26 70°31'30.1929"N 149°42'14.4713"W 0.90 79.598 0.02 -0.94 5444.99 144.97 20.79 30.13 318.17 11043.07 73.87 320.22 5169.96 5129.21 6573.15 -5588.82 536084.40 6041816.22 70°31'30.8740"N 149°42'16.2444"W 2.36 -82.985 0.44 2.42 5502.80 149.00 20.95 30.62 318.18 11137.36 73.96 319.47 5196.08 5155.33 6642.39 -5647.24 536025.59 6041885.13 70°31'31.5546"N 149°42'17.9680"W 0.77 120.581 0.10 -0.80 5560.84 152.98 21.10 31.11 318.21 11232.64 73.57 320.16 5222.72 5181.97 6712.28 -5706.27 535966.18 6041954.67 70°31'32.2415"N 149°42'19.7096"W 0.81 -38.113 -0.41 0.72 5619.42 157.02 21.26 31.61 318.24 11326.45 73.95 319.85 5248.95 5208.20 6781.28 -5764.16 535907.91 6042023.34 70°31'32.9196"N 149°42'21.4175"W 0.51 81.824 0.41 -0.33 5677.32 161.01 21.42 32.11 318.27 11421.25 74.18 321.47 5274.98 5234.23 6851.77 -5821.94 535849.74 6042093.51 70°31'33.6125"N 149°42'23.1224"W 1.66 27.421 0.24 1.71 5736.71 165.04 21.58 32.63 318.32 11516.46 74.44 321.61 5300.73 5259.98 6923.55 -5878.95 535792.33 6042164.95 70°31'34.3180"N 149°42'24.8047"W 0.31 135.059 0.27 0.15 5797.50 169.08 21.74 33.15 318.39 11610.86 73.32 322.78 5326.94 5286.19 6995.20 -5934.54 535736.35 6042236.28 70°31'35.0222"N 149°42'26.4450"W 1.68 -73.784 -1.19 1.24 5858.40 173.06 21.90 33.68 318.47 11703.62 73.46 322.28 5353.46 5312.71 7065.75 -5988.61 535681.88 6042306.52 70°31'35.7156"N 149°42'28.0408"W 0.54 -178.263 0.15 -0.54 5918.49 176.96 22.06 34.20 318.56 11790.81 72.83 322.26 5378.74 5337.99 7131.74 -6039.68 535630.45 6042372.22 70°31'36.3642"N 149°42'29.5476"W 0.72 -55.112 -0.72 -0.02 5974.62 180.64 22.22 34.69 318.63 11885.16 72.89 322.17 5406.54 5365.79 7203.00 -6094.92 535574.82 6042443.16 70°31'37.0645"N 149°42'31.1778"W 0.11 -145.084 0.06 -0.10 6035.20 184.63 22.39 35.23 318.70 11979.08 72.29 321.73 5434.64 5393.89 7273.57 -6150.15 535519.20 6042513.41 70°31'37.7581"N 149°42'32.8077"W 0.78 -47.324 -0.64 -0.47 6095.11 188.61 22.57 35.77 318.76 12074.02 72.51 321.48 5463.35 5422.60 7344.50 -6206.36 535462.60 6042584.01 70°31'38.4552"N 149°42'34.4664"W 0.34 114.944 0.23 -0.26 6155.19 192.65 22.75 36.32 318.82 12169.44 71.87 322.94 5492.54 5451.79 7416.28 -6262.03 535406.53 6042655.48 70°31'39.1608"N 149°42'36.1092"W 1.60 -144.528 -0.67 1.53 6216.23 196.69 22.94 36.87 318.89 12263.75 71.83 322.91 5521.92 5481.17 7487.79 -6316.05 535352.11 6042726.67 70°31'39.8635"N 149°42'37.7037"W 0.05 -83.319 -0.04 -0.03 6277.26 200.65 23.12 37.42 318.96 12358.95 71.93 322.03 5551.52 5510.77 7559.54 -6371.17 535296.60 6042798.10 70°31'40.5687"N 149°42'39.3304"W 0.88 -79.528 0.11 -0.92 6338.35 204.68 23.32 37.98 319.03 12452.37 72.04 321.41 5580.42 5539.67 7629.28 -6426.21 535241.18 6042867.53 70°31'41.2541"N 149°42'40.9547"W 0.64 -16.86 0.12 -0.66 6397.47 208.67 23.51 38.54 319.08 12546.10 72.26 321.34 5609.15 5568.40 7698.98 -6481.90 535185.10 6042936.91 70°31'41.9391"N 149°42'42.5983"W 0.25 -72.81 0.23 -0.07 6456.44 212.70 23.70 39.10 319.12 12641.40 72.63 320.10 5637.89 5597.14 7769.31 -6539.42 535127.19 6043006.91 70°31'42.6303"N 149°42'44.2960"W 1.30 -75.834 0.39 -1.30 6515.72 216.84 23.90 39.68 319.15 12735.55 72.80 319.40 5665.87 5625.12 7837.92 -6597.51 535068.72 6043075.18 70°31'43.3045"N 149°42'46.0103"W 0.73 -170.785 0.18 -0.74 6573.20 220.97 24.10 40.25 319.15 12829.33 71.34 319.15 5694.74 5653.99 7905.54 -6655.72 535010.14 6043142.47 70°31'43.9690"N 149°42'47.7282"W 1.58 -30.162 -1.56 -0.27 6629.68 225.09 24.30 40.82 319.15 12924.11 71.88 318.82 5724.64 5683.89 7973.40 -6714.74 534950.74 6043209.99 70°31'44.6359"N 149°42'49.4701"W 0.66 0 0.57 -0.35 6686.26 229.25 24.51 41.40 319.15 13019.16 72.15 318.82 5753.99 5713.24 8041.44 -6774.27 534890.84 6043277.69 70°31'45.3046"N 149°42'51.2269"W 0.28 72.615 0.28 0.00 6742.94 233.45 24.72 41.99 319.14 13114.75 72.61 320.34 5782.92 5742.17 8110.80 -6833.34 534831.39 6043346.71 70°31'45.9861"N 149°42'52.9702"W 1.59 -31.779 0.48 1.59 6800.98 237.66 24.93 42.58 319.14 13207.75 73.12 320.01 5810.32 5769.57 8179.05 -6890.25 534774.10 6043414.64 70°31'46.6569"N 149°42'54.6502"W 0.64 -68.93 0.55 -0.35 6858.32 241.76 25.13 43.16 319.16 13300.04 73.32 319.47 5836.97 5796.22 8246.48 -6947.36 534716.62 6043481.74 70°31'47.3195"N 149°42'56.3356"W 0.60 129.288 0.22 -0.59 6914.81 245.86 25.33 43.74 319.17 13394.92 72.38 320.68 5864.95 5824.20 8316.01 -7005.54 534658.05 6043550.93 70°31'48.0027"N 149°42'58.0530"W 1.57 -39.588 -0.99 1.28 6973.17 250.06 25.54 44.34 319.18 13490.07 73.11 320.05 5893.17 5852.42 8385.98 -7063.51 534599.70 6043620.57 70°31'48.6904"N 149°42'59.7640"W 0.99 -36.37 0.77 -0.66 7032.02 254.26 25.76 44.95 319.20 13583.31 73.54 319.72 5919.92 5879.17 8454.29 -7121.06 534541.78 6043688.55 70°31'49.3616"N 149°43'1.4627"W 0.57 -177.664 0.46 -0.35 7089.29 258.41 25.96 45.55 319.21 13677.91 72.14 319.66 5947.83 5907.08 8523.22 -7179.53 534482.92 6043757.13 70°31'50.0389"N 149°43'3.1887"W 1.48 34.915 -1.48 -0.06 7147.02 262.62 26.18 46.15 319.21 13771.51 72.77 320.12 5976.05 5935.30 8591.47 -7237.03 534425.05 6043825.06 70°31'50.7096"N 149°43'4.8859"W 0.82 -173.464 0.67 0.49 7204.25 266.77 26.39 46.75 319.22 13867.41 71.20 319.93 6005.71 5964.96 8661.36 -7295.61 534366.08 6043894.61 70°31'51.3964"N 149°43'6.6154"W 1.65 -32.819 -1.64 -0.20 7262.90 271.01 26.62 47.36 319.23 13961.89 71.76 319.55 6035.72 5994.97 8729.72 -7353.51 534307.80 6043962.64 70°31'52.0682"N 149°43'8.3244"W 0.70 -74.67 0.59 -0.40 7320.18 275.17 26.84 47.97 319.24 14056.90 72.05 318.45 6065.23 6024.48 8797.88 -7412.76 534248.18 6044030.46 70°31'52.7379"N 149°43'10.0734"W 1.14 48.036 0.31 -1.16 7377.01 279.40 27.07 48.58 319.24 14150.84 72.73 319.24 6093.65 6052.90 8865.30 -7471.68 534188.88 6044097.53 70°31'53.4003"N 149°43'11.8128"W 1.08 -87.373 0.72 0.84 7433.17 283.61 27.29 49.19 319.23 14245.79 72.76 318.58 6121.81 6081.06 8933.64 -7531.28 534128.91 6044165.53 70°31'54.0718"N 149°43'13.5720"W 0.66 179.633 0.03 -0.70 7490.12 287.88 27.52 49.81 319.22 14341.34 71.28 318.59 6151.31 6110.56 9001.79 -7591.40 534068.42 6044233.34 70°31'54.7415"N 149°43'15.3467"W 1.55 -51.307 -1.55 0.01 7546.80 292.16 27.75 50.43 319.21 14436.42 71.86 317.83 6181.37 6140.62 9069.04 -7651.51 534007.93 6044300.25 70°31'55.4023"N 149°43'17.1213"W 0.97 37.314 0.61 -0.80 7602.59 296.41 27.98 51.05 319.20 14528.44 72.21 318.11 6209.75 6169.00 9134.06 -7710.11 533948.97 6044364.93 70°31'56.0412"N 149°43'18.8513"W 0.48 66.221 0.38 0.30 7656.45 300.56 28.21 51.65 319.18 14601.89 72.83 319.57 6231.81 6191.06 9186.81 -7756.22 533902.57 6044417.41 70°31'56.5594"N 149°43'20.2125"W 2.08 -127.102 0.84 1.99 7700.39 303.86 28.39 52.13 319.17 14696.33 72.47 319.07 6259.98 6219.23 9255.17 -7814.98 533843.44 6044485.43 70°31'57.2311"N 149°43'21.9472"W 0.63 18.926 -0.38 -0.53 7757.51 308.10 28.62 52.76 319.17 14789.11 73.14 319.31 6287.40 6246.65 9322.25 -7872.90 533785.14 6044552.19 70°31'57.8903"N 149°43'23.6573"W 0.76 -168.099 0.72 0.26 7813.51 312.28 28.84 53.37 319.17 14883.60 71.52 318.95 6316.08 6275.33 9390.33 -7931.81 533725.86 6044619.93 70°31'58.5592"N 149°43'25.3966"W 1.75 10.551 -1.71 -0.38 7870.33 316.52 29.08 54.00 319.17 14978.52 72.39 319.12 6345.49 6304.74 9458.48 -7990.98 533666.31 6044687.74 70°31'59.2288"N 149°43'27.1434"W 0.93 5.058 0.92 0.18 7927.17 320.77 29.32 54.63 319.17 15073.56 72.93 319.17 6373.81 6333.06 9527.10 -8050.33 533606.59 6044756.01 70°31'59.9030"N 149°43'28.8956"W 0.57 166.934 0.57 0.05 7984.44 325.06 29.55 55.26 319.17 15168.47 71.50 319.52 6402.80 6362.05 9595.66 -8109.20 533547.34 6044824.23 70°32'0.5766"N 149°43'30.6340"W 1.55 160.868 -1.51 0.37 8041.73 329.31 29.79 55.89 319.17 15261.39 69.85 320.13 6433.55 6392.80 9662.65 -8165.77 533490.40 6044890.90 70°32'1.2349"N 149°43'32.3043"W 1.88 163.535 -1.78 0.66 8097.89 333.41 30.03 56.50 319.17 15356.82 68.31 320.62 6467.62 6426.87 9731.31 -8222.62 533433.17 6044959.23 70°32'1.9094"N 149°43'33.9829"W 1.68 170.996 -1.61 0.51 8155.63 337.54 30.30 57.12 319.19 15452.18 66.63 320.91 6504.16 6463.41 9799.53 -8278.33 533377.08 6045027.13 70°32'2.5798"N 149°43'35.6280"W 1.78 -179.282 -1.76 0.30 8213.14 341.59 30.57 57.73 319.21 15546.54 64.47 320.88 6543.22 6502.47 9866.18 -8332.51 533322.54 6045093.47 70°32'3.2347"N 149°43'37.2279"W 2.29 -169.122 -2.29 -0.03 8269.37 345.50 30.85 58.32 319.22 15640.94 63.17 320.60 6584.86 6544.11 9931.78 -8386.12 533268.57 6045158.76 70°32'3.8792"N 149°43'38.8110"W 1.40 -163.648 -1.38 -0.30 8324.66 349.34 31.14 58.89 319.24 15735.91 61.20 319.94 6629.18 6588.43 9996.37 -8439.80 533214.53 6045223.05 70°32'4.5139"N 149°43'40.3962"W 2.16 180 -2.07 -0.69 8378.95 353.13 31.44 59.46 319.25 15830.79 59.60 319.94 6676.04 6635.29 10059.51 -8492.89 533161.09 6045285.88 70°32'5.1342"N 149°43'41.9641"W 1.69 -164.185 -1.69 0.00 8431.91 356.82 31.76 60.01 319.26 15925.39 57.75 319.32 6725.22 6684.47 10121.08 -8545.23 533108.41 6045347.15 70°32'5.7391"N 149°43'43.5096"W 2.03 173.766 -1.96 -0.66 8483.45 360.42 32.08 60.55 319.26 16020.12 55.93 319.56 6777.03 6736.28 10181.32 -8596.79 533056.51 6045407.09 70°32'6.3310"N 149°43'45.0323"W 1.93 173.339 -1.92 0.25 8533.83 363.91 32.41 61.06 319.26 16112.78 53.32 319.94 6830.67 6789.92 10238.98 -8645.61 533007.38 6045464.47 70°32'6.8975"N 149°43'46.4739"W 2.84 166.587 -2.82 0.41 8582.13 367.18 32.74 61.55 319.26 16206.64 49.83 321.03 6889.00 6848.25 10295.69 -8692.40 532960.28 6045520.91 70°32'7.4547"N 149°43'47.8558"W 3.83 170.082 -3.72 1.16 8629.85 370.28 33.08 62.01 319.27 16302.87 47.43 321.60 6952.59 6911.84 10352.05 -8737.54 532914.83 6045577.01 70°32'8.0085"N 149°43'49.1890"W 2.53 -154.901 -2.49 0.59 8677.52 373.22 33.44 62.45 319.29 16394.30 46.20 320.80 7015.16 6974.41 10404.01 -8779.31 532872.77 6045628.73 70°32'8.5189"N 149°43'50.4226"W 1.49 -167.745 -1.35 -0.87 8721.44 375.90 33.79 62.85 319.30 16490.56 45.22 320.50 7082.38 7041.63 10457.29 -8823.00 532828.79 6045681.76 70°32'9.0425"N 149°43'51.7129"W 1.04 -103.303 -1.02 -0.31 8766.32 378.65 34.15 63.26 319.31 16584.15 45.18 320.26 7148.33 7107.58 10508.44 -8865.34 532786.16 6045732.67 70°32'9.5450"N 149°43'52.9636"W 0.19 -52.741 -0.04 -0.26 8809.35 381.30 34.51 63.65 319.31 16679.83 45.37 319.91 7215.66 7174.91 10560.58 -8908.96 532742.25 6045784.56 70°32'10.0573"N 149°43'54.2519"W 0.33 11.521 0.20 -0.37 8853.12 384.01 34.89 64.06 319.32 Tie in Point of MPU F-10APB1 to MPU F-10 16698.00 45.51 319.95 7228.41 7187.66 10570.49 -8917.30 532733.86 6045794.42 70°32'10.1546"N 149°43'54.4980"W 0.79 0 0.77 0.22 8861.43 384.32 33.22 65.60 319.32 TOWS 16720.22 52.12 319.95 7243.03 7202.28 10583.29 -8928.05 532723.04 6045807.15 70°32'10.2803"N 149°43'54.8157"W 29.75 0 29.75 0.00 8872.16 384.45 33.26 65.60 319.32 Interpolated Azimuth 16750.32 65.34 319.95 7258.62 7217.87 10602.94 -8944.57 532706.41 6045826.70 70°32'10.4734"N 149°43'55.3035"W 43.92 0 43.92 0.00 8888.64 384.64 33.32 65.62 319.32 Interpolated Azimuth 16780.25 78.37 319.95 7267.92 7227.17 10624.66 -8962.83 532688.03 6045848.32 70°32'10.6868"N 149°43'55.8429"W 43.53 0 43.53 0.00 8906.87 384.86 33.39 65.65 319.32 Interpolated Azimuth 16810.35 91.20 319.95 7270.65 7229.90 10647.56 -8982.08 532668.66 6045871.11 70°32'10.9118"N 149°43'56.4113"W 42.62 60.011 42.62 0.00 8926.08 385.10 33.43 65.69 319.32 Interpolated Azimuth 16825.41 94.43 325.58 7269.91 7229.16 10659.53 -8991.18 532659.49 6045883.03 70°32'11.0294"N 149°43'56.6801"W 43.06 85.995 21.45 37.38 8936.28 385.22 33.45 65.71 319.32 16855.45 95.26 339.47 7267.36 7226.61 10686.02 -9004.95 532645.57 6045909.44 70°32'11.2897"N 149°43'57.0874"W 46.15 82.672 2.76 46.24 8959.98 385.45 33.47 65.71 319.33 16885.59 96.62 351.02 7264.23 7223.48 10714.95 -9012.58 532637.78 6045938.33 70°32'11.5742"N 149°43'57.3133"W 38.38 107.924 4.51 38.32 8987.15 385.68 33.50 65.71 319.34 16915.53 95.32 355.01 7261.12 7220.37 10744.50 -9016.20 532634.00 6045967.85 70°32'11.8648"N 149°43'57.4211"W 13.95 94.704 -4.34 13.33 9015.62 385.88 33.55 65.72 319.36 16945.64 95.04 358.32 7258.40 7217.65 10774.44 -9017.94 532632.08 6045997.77 70°32'12.1592"N 149°43'57.4736"W 10.99 121.175 -0.93 10.99 9044.80 386.07 33.59 65.72 319.39 16975.80 93.13 1.47 7256.25 7215.50 10804.51 -9018.00 532631.86 6046027.85 70°32'12.4550"N 149°43'57.4763"W 12.19 121.133 -6.33 10.44 9074.41 386.26 33.65 65.73 319.41 17005.86 91.63 3.95 7255.00 7214.25 10834.51 -9016.58 532633.11 6046057.85 70°32'12.7500"N 149°43'57.4355"W 9.64 116.175 -4.99 8.25 9104.20 386.44 33.72 65.74 319.44 17035.69 90.40 6.45 7254.47 7213.72 10864.21 -9013.87 532635.65 6046087.56 70°32'13.0421"N 149°43'57.3568"W 9.34 82.876 -4.12 8.38 9133.92 386.61 33.80 65.75 319.46 17065.77 90.86 10.14 7254.14 7213.39 10893.97 -9009.53 532639.82 6046117.34 70°32'13.3348"N 149°43'57.2299"W 12.36 92.046 1.53 12.27 9163.98 386.77 33.89 65.76 319.49 17095.53 90.74 13.46 7253.72 7212.97 10923.09 -9003.45 532645.74 6046146.49 70°32'13.6213"N 149°43'57.0515"W 11.16 107.116 -0.40 11.16 9193.71 386.92 34.00 65.77 319.52 17125.30 89.72 16.77 7253.60 7212.85 10951.83 -8995.69 532653.34 6046175.27 70°32'13.9040"N 149°43'56.8236"W 11.63 125.369 -3.43 11.12 9223.36 387.06 34.12 65.78 319.55 17155.42 88.28 18.80 7254.13 7213.38 10980.50 -8986.49 532662.38 6046203.99 70°32'14.1861"N 149°43'56.5533"W 8.26 100.427 -4.78 6.74 9253.20 387.19 34.26 65.79 319.58 17185.27 87.97 20.49 7255.11 7214.36 11008.60 -8976.46 532672.25 6046232.14 70°32'14.4626"N 149°43'56.2585"W 5.75 84.248 -1.04 5.66 9282.61 387.32 34.42 65.80 319.62 17218.16 88.40 24.71 7256.15 7215.40 11038.94 -8963.83 532684.71 6046262.55 70°32'14.7611"N 149°43'55.8871"W 12.89 52.43 1.31 12.83 9314.68 387.44 34.61 65.82 319.65 17245.32 88.80 25.23 7256.81 7216.06 11063.56 -8952.37 532696.03 6046287.23 70°32'15.0033"N 149°43'55.5499"W 2.42 70.679 1.47 1.91 9340.91 387.53 34.78 65.83 319.68 17275.24 90.25 29.36 7257.06 7216.31 11090.14 -8938.65 532709.59 6046313.88 70°32'15.2649"N 149°43'55.1463"W 14.63 111.694 4.85 13.80 9369.47 387.63 34.99 65.85 319.72 17305.40 89.88 30.29 7257.03 7216.28 11116.30 -8923.65 532724.44 6046340.13 70°32'15.5224"N 149°43'54.7048"W 3.32 111.888 -1.23 3.08 9397.84 387.71 35.22 65.86 319.75 17338.02 88.80 32.98 7257.40 7216.65 11144.07 -8906.55 532741.39 6046367.99 70°32'15.7957"N 149°43'54.2012"W 8.89 -127.913 -3.31 8.25 9428.16 387.80 35.49 65.88 319.79 17365.38 86.71 30.29 7258.47 7217.72 11167.34 -8892.21 532755.60 6046391.34 70°32'16.0248"N 149°43'53.7792"W 12.44 -79.568 -7.64 -9.83 9453.57 387.87 35.73 65.90 319.83 Page 3 of 4 # 17395.46 87.21 27.59 7260.07 7219.32 11193.63 -8877.67 532769.98 6046417.70 70°32'16.2834"N 149°43'53.3514"W 9.12 -67.524 1.66 -8.98 9481.98 387.96 36.02 65.92 319.86 17425.29 88.40 24.72 7261.21 7220.46 11220.38 -8864.54 532782.97 6046444.53 70°32'16.5467"N 149°43'52.9649"W 10.41 -70.609 3.99 -9.62 9510.61 388.06 36.31 65.94 319.90 17455.35 89.32 22.11 7261.81 7221.06 11247.96 -8852.59 532794.75 6046472.17 70°32'16.8180"N 149°43'52.6136"W 9.20 -97.327 3.06 -8.68 9539.84 388.17 36.62 65.96 319.93 17485.45 89.08 20.24 7262.23 7221.48 11276.02 -8841.72 532805.47 6046500.29 70°32'17.0942"N 149°43'52.2940"W 6.26 -67.393 -0.80 -6.21 9569.36 388.29 36.93 65.98 319.97 17516.24 90.28 17.36 7262.40 7221.65 11305.16 -8831.80 532815.22 6046529.48 70°32'17.3809"N 149°43'52.0024"W 10.13 -84.229 3.90 -9.35 9599.79 388.43 37.26 66.00 320.00 17545.57 90.64 13.79 7262.17 7221.42 11333.41 -8823.93 532822.94 6046557.77 70°32'17.6588"N 149°43'51.7711"W 12.23 -64.464 1.23 -12.17 9628.97 388.57 37.58 66.03 320.04 17575.34 91.99 10.96 7261.48 7220.73 11362.48 -8817.55 532829.15 6046586.87 70°32'17.9447"N 149°43'51.5840"W 10.53 -91.436 4.53 -9.51 9658.70 388.73 37.89 66.05 320.07 17605.40 91.91 7.88 7260.46 7219.71 11392.11 -8812.63 532833.90 6046616.53 70°32'18.2362"N 149°43'51.4401"W 10.24 -76.711 -0.27 -10.25 9688.74 388.90 38.21 66.07 320.10 17635.36 92.79 4.13 7259.23 7218.48 11421.88 -8809.50 532836.86 6046646.31 70°32'18.5290"N 149°43'51.3487"W 12.85 -79.645 2.94 -12.52 9718.60 389.08 38.52 66.10 320.14 17665.31 93.53 0.03 7257.58 7216.83 11451.75 -8808.42 532837.78 6046676.19 70°32'18.8228"N 149°43'51.3178"W 13.89 -99.154 2.47 -13.69 9748.21 389.28 38.81 66.12 320.17 17690.33 93.10 357.38 7256.13 7215.38 11476.72 -8808.98 532837.08 6046701.15 70°32'19.0684"N 149°43'51.3353"W 10.71 61.801 -1.72 -10.59 9772.70 389.45 39.04 66.15 320.19 17720.63 94.21 359.46 7254.20 7213.45 11506.95 -8809.82 532836.07 6046731.37 70°32'19.3656"N 149°43'51.3609"W 7.77 139.036 3.66 6.86 9802.32 389.67 39.32 66.17 320.22 17751.30 91.72 1.62 7252.61 7211.86 11537.57 -8809.53 532836.19 6046761.99 70°32'19.6668"N 149°43'51.3535"W 10.74 138.463 -8.12 7.04 9832.53 389.88 39.62 66.20 320.25 17780.24 90.06 3.09 7252.17 7211.42 11566.48 -8808.34 532837.22 6046790.90 70°32'19.9512"N 149°43'51.3194"W 7.66 81.94 -5.74 5.08 9861.21 390.07 39.92 66.23 320.28 17810.48 90.37 5.28 7252.05 7211.30 11596.64 -8806.13 532839.25 6046821.07 70°32'20.2478"N 149°43'51.2554"W 7.31 84.632 1.03 7.24 9891.29 390.27 40.25 66.26 320.32 17840.33 90.64 8.16 7251.79 7211.04 11626.28 -8802.64 532842.58 6046850.73 70°32'20.5393"N 149°43'51.1534"W 9.69 100.953 0.90 9.65 9921.09 390.46 40.60 66.29 320.35 17876.72 90.21 10.38 7251.52 7210.77 11662.19 -8796.78 532848.24 6046886.67 70°32'20.8926"N 149°43'50.9818"W 6.21 94.934 -1.18 6.10 9957.47 390.68 41.05 66.33 320.39 17900.39 89.88 14.20 7251.50 7210.75 11685.31 -8791.74 532853.15 6046909.82 70°32'21.1200"N 149°43'50.8340"W 16.20 0 -1.39 16.14 9981.12 390.81 41.36 66.36 320.42 17944.00 89.88 14.20 7251.59 7210.84 11727.59 -8781.04 532863.61 6046952.15 70°32'21.5359"N 149°43'50.5199"W 0.00 N/A 0.00 0.00 10024.61 391.05 41.96 66.41 320.47 Projected to TD Page 4 of 4 # David Douglas Hilcorp Alaska, LLC Sr. GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 12/04/2023 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL WELL: MPU F-10A + PB1 PTD: 223-027 API: 50-029-22679-01-00 (MPU F-10A) 50-029-22679-70-00 (MPU F-10APB1) FINAL LWD FORMATION EVALUATION LOGS (10/30/2023 to 11/07/2023) Multiple Propagation Resistivity & Gamma Ray (2” & 5” MD/TVD Color Logs) Pressure While Drilling (PWD) Final Definitive Directional Surveys SFTP Transfer - Data Main Folders: SFTP Transfer - Data Sub-Folders: Please include current contact information if different from above. PTD: 223-027 MPU F-10A: T38197 MPU F-10A PB1: T38198 12/5/2023Kayla Junke Digitally signed by Kayla Junke Date: 2023.12.05 10:36:54 -09'00' 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Temp Jet Pump 2.Operator Name: 4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number): 10. Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 18,265'N/A Casing Collapse Conductor 520psi Surface 3,090psi Production 5,410psi Liner 8,100psi Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Wells Manager Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng MILNE PT UNIT F-10A MILNE POINT KUPARUK RIVER OIL N/A 7,252' 18,248' 7,255' 3,051 N/A Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): 11/20/2023 Perforation Depth MD (ft): STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025509, ADL0355018 & ADL0388235 223-027 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22679-01-00 Hilcorp Alaska LLC C.O. 432E Length Size Proposed Pools: 112' 112' 9.2# / L-80 / NSTC TVD Burst 16,547' MD 1,530psi 5,750psi 7,700psi 4,484' 7,252' 8,635' 18,265' 16,704' 7,233' 7,240psi 80' 20" 9-5/8" 2-3/8" 8,604' 1,785' 16,675' 7" ryan.lewis@hilcorp.com 303-906-5178 See Schematic See Schematic 3-1/2" Baker S-3 Packer and N/A 16,477 MD/ 7,073 and N/A Ryan Lewis No Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 12:34 pm, Nov 14, 2023 Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2023.11.10 16:02:58 - 09'00' Taylor Wellman (2143) 323-611 10-404 No depths are provided on schematics. SFD MGR21NOV23 SFD 3,051 SFD 11/16/2023 DSR-11/15/23 * Approved for 30 day flow period with 24/7 man watch and 1.5 well bore volumes of KWF available and piped for emergency bullheading into wellbore. * Pressure test of Sidoti check to ~1500 psi pressure differential tubing to IA. Pressure test not to exceed fracture gradient of Kuparuk confining zones ~.65 psi/ft JLC 11/24/2023 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.11.24 13:19:42 -09'00'11/24/23 RBDMS JSB 112823 Convert to JP Well: MPU F-10A PTD: 223-027 Well Name:MPU F-10A API Number:50-029-22679-01-00 Current Status:Oil Well Pad:F-Pad Estimated Start Date:November 20, 2023 Rig:SL/EL Reg. Approval Req’d?Yes Date Reg. Approval Rec’vd: Regulatory Contact:Tom Fouts Permit to Drill Number:223-027 First Call Engineer:Ryan Lewis (303) 906-5178 (M) Second Call Engineer:Taylor Wellman (907) 777-8449 (O) (907) 947-9533 (M) AFE Number:Job Type:Convert to JP Current Bottom Hole Pressure: 3,792 psi @ 7,411’ TVD SBHPS taken 08/19/2023 |9.9 PPGE Maximum Expected BHP:3,792 psi @ 7,411’ TVD SBHPS taken 08/19/2023 |9.9 PPGE Max Potential Surface Pressure: 3,051 psi Gas Column Gradient (0.1 psi/ft) Max Angle:76° @ 9,059’ MD within parent bore Max Dogleg Severity: 8.6 deg/100’ @ 8,133’ MD within parent bore Brief Well Summary: MPU F-10A is a slant producer in the Kuparuk A-sand that was sidetracked to the North and expecting to cross a fault to access un-swept oil (PTD 223-027). The fault to the North never materialized during drilling operations so we would like to temporarily test it with a JP for 30 days to determine if the well should become an injector or perform a full-bore RWO conversion to ESP (Sundry 323-491). Notes Regarding Wellbore Condition x MIT-IA to 3,244 psi completed on 6/27/2023. x We cannot install a SSSV in the tubing, but we will be able to provide isolation for the IA with the use of a Sidoti Seal, check valve, installed in the JP power fluid intake. We will provide an individual for 24 hour well support supervision. In the event of a leak on any connection above the Master valve, the master valve can be shut in and the well will be bullheaded with power fluid line pumping into the IA taking returns to formation. Objective x Set Patch Over GLM (POGLM) across tubing punch holes. Eline 1. MIRU Eline. Pressure test PCE to 250 psi low / 3500 psi high. 2. MU and RIH with guns to punch tubing at 16,430’ MD. POOH. a. 5’ above the collar at 16,435’ MD. 3. MU and RIH with lower packer of the patch assembly and CCL. a. Locate tubing punch holes at 16,430’ MD with CCL if possible. 4. Set the lower packer according to the depth offset required from the tubing punch holes. 5. RDMO Eline. Proposed punch tubing holes: 16,430'-16,435' 5' gun, 4 spf. Per R. Lewis, 11/16/2023 SFD Convert to JP Well: MPU F-10A PTD: 223-027 Slickline 1. MIRU Slickline. Pressure test PCE to 250 psi low / 3500 psi high. 2. MU and RIH set the patch, In Situ GLM, loaded with the 3”JP and upper packer across tubing punch holes. a. The JP will have a Sidoti seal installed. b. JP size 12B 3. POOH and RDMO slickline. Attachments: x Current Schematic x Proposed Schematic x Packer Over Gas Lift Mandrel (POGLM) schematic Fullbore 1. Bullhead at rate and fluid density to induce 1500 psi pressure difference across Sidoti check to assure valve and production packer will hold at 1500 psi differential pressure. IA to be monitored and pressure charted for 10 minute test. Assure pressure at sand face does not exceed Kuparuk confining zone fracture gradient. - mgr Convert to JP Well: MPU F-10A PTD: 223-027 Convert to JP Well: MPU F-10A PTD: 223-027 Proposed punch tubing holes: 16,430'-16,435' 5' gun, 4 spf. Per R. Lewis, 11/16/2023 SFD Convert to JP Well: MPU F-10A PTD: 223-027 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Completion 2.Operator Name: 4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9.Property Designation (Lease Number):10.Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): ±18,620 N/A Casing Collapse Conductor 520psi Surface 3,090psi Production 5,410psi Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14.Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16.Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Wells Manager Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng ryan.lewis@hilcorp.com 303-906-5178 See Schematic See Schematic 3-1/2" Baker S-3 Packer and N/A 16,477 MD/ 7,073 and N/A Ryan Lewis 80' 20" 9-5/8" 7" 8,604' 17,051' 1,530psi 5,750psi 7,240psi 4,484' 7,490' 8,635' 17,080' Length Size Proposed Pools: 112' 112' 9.2# / L-80 / NSTC TVD Burst 16,547' MD STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025509, ADL0355018 & ADL0388235 223-027 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22679-01-00 Hilcorp Alaska LLC C.O. 432E AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): 9/19/2023 Perforation Depth MD (ft): Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY MILNE PT UNIT F-10A MILNE POINT KUPARUK RIVER OIL N/A ±7,270 ±18,620 ±7,270 3,051 N/A No Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 11:03 am, Aug 29, 2023 323-491 Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2023.08.29 09:19:16 - 08'00' Taylor Wellman (2143) 3,051 DSR-8/29/23SFD 9/7/2023 * BOPE test to 3500 psi. Annular to 2500 psi. * Perforating BHA not to exceed 500'. MGR30AUG23 10-404 Perforate *&: 09/07/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.09.07 15:22:55 -08'00' RBDMS JSB 090823 Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO Well Name:MPU F-10A API Number:50-029-22679-01-00 Current Status:Oil Well Pad:F-Pad Estimated Start Date:September 19, 2023 Rig:CTU/E-line/ASR Reg. Approval Req’d?Yes Date Reg. Approval Rec’vd: Regulatory Contact:Tom Fouts Permit to Drill Number:223-027 First Call Engineer:Ryan Lewis (303) 906-5178 (M) Second Call Engineer:Taylor Wellman (907) 777-8449 (O) (907) 947-9533 (M) AFE Number:231-00063 Job Type:APERF / ESP RWO Current Bottom Hole Pressure: 3,792 psi @ 7,411’ TVD SBHPS taken 08/19/2023 |9.9 PPGE Maximum Expected BHP:3,792 psi @ 7,411’ TVD SBHPS taken 08/19/2023 |9.9 PPGE Max Potential Surface Pressure: 3,051 psi Gas Column Gradient (0.1 psi/ft) Max Angle:76° @ 9,059’ MD within parent bore Max Dogleg Severity: 8.6 deg/100’ @ 8,133’ MD within parent bore Tie in Log: To be provided by Geologist Brief Well Summary: MPU F-10A is a slant producer in the Kuparuk A-sand that will be sidetracked across a fault to the North beyond to access unswept oil (PTD 223-027). It is believed the fault to the North is not in communication with the current MPU F-10 parent block. Objectives: x Perforate high resistivity intervals within the cemented F-10A lateral using perf guns conveyed on service coil. x Perform Tubing Cut and remove 3-1/2” tubing, run 2-7/8” ESP completion. Notes Regarding Wellbore Condition: x June 2023 -MIT-IA Passed @ 3244 psi. x On initial rig up all formations should be isolated via cement pumped by CDR2 and possible Liner Top Packer (LTP). x If the BHP is confirmed below the 8.55ppg EMW and in conformance with CO 390A, no packer will be run and the completion will be adjusted to remove. Procedure (Sundried Work) Coiled Tubing: Notes: x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 3,792 psi @ 7,411’ TVD SBHPS taken 08/19/2023 |9.9 PPGE 3,051 psi Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO 1. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 2.Circulate ~154 bbls 10.1 brine (Confirm CDR2 KWF used) during logging run. (Bullheading is not possible prior to first gun run, but up to WSS discretion to bullhead once a fluid path is created.) Confirm CDR2 did not leave KWF in hole, current procedure calls for KCl water. a. Estimated Wellbore volume to PBTD = 153.5 bbls b. 3-1/2” Liner – 16,500’ x 0.0087 = 143.5 bbls c. 2-3/8” Liner – 2,570’ x 0.0039 = 10 bbls 3. MU and RIH with logging tools and drift BHA: 1.56” dummy gun & nozzle. 4. Flag pipe as appropriate per WSS for adperf runs. 5. POOH and freeze protect tubing as needed. 6. Confirm good log data. Send to Geologist for depth correction: a. Graham Emerson - graham.emerson@hilcorp.com / 907-793-0315. 7. At surface, prepare for deployment of TCP guns. 8. Confirm well is dead. Bleed any pressure off to return tank. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 9.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 10.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well.Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 11. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule. a. All gross intervals will be < 500’. b. Note any tubing pressure change in WSR. 12. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface. 13. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 14. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 15. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 16. RDMO CTU. 17. Freeze protect well. Slickline 1. RU SL unit and pressure test PCE to 250psi/2,500psi high. 2. Run SBHPS to confirm BHP, to calculate KWF and MASP. 3. RD SL Unit. E-Line 1. MIRU EL, PT PCE to 250 psi low / 3,500 psi high 2. RIH with a mechanical cutter MU PCE. - mgr Each perforating run BHA to be less than 500'. also email: melvin.rixse@alaska.gov Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO 3. Cut 5’ below collar on first full joint of 3.5” 9.2# L-80 NSTC above the packer. Estimated cut depth ~16,450’ RKB. 4. RDMO Pumping and Well Support 5. Clear and level pad area in front of well. Spot rig mats and containment. 6. RD well house and flowlines. Clear and level area around well. 7. RU Little Red Services. RU reverse out skid and 500 bbl returns tank. 8. Pressure test lines to 3,000 psi. 9. Circulate at least one wellbore volume with 10.1 ppg brine (confirm KWF after perforations) down tubing, taking returns up casing to 500 bbl returns tank. 10. Confirm well is dead. Freeze protect tubing/casing as needed with 60/40 MeOH or diesel. 11. RD Little Red Services and reverse out skid. 12. Set BPV. 13. ND Tree. NU BOPE. Brief RWO Procedure 14. MIRU Hilcorp ASR #1 WO Rig, ancillary equipment and lines to 500 bbl returns tank. 15. Check for pressure and if 0 psi set CTS plug. If needed, bleed off any residual pressure off tubing and casing. a. If required, kill well w/ 10.1 ppg (confirm KWF based on updated SBHP) ppg brine prior to setting CTS 16. Test BOPE to 250 psi Low/ 3,500 psi High, annular to 250 psi Low/ 2,500 psi High (hold each ram/valve and test for 5-min). Record accumulator pre-charge pressures and chart tests. a. Perform Test per ASR 1 BOP Test Procedure. b. Notify AOGCC 24 hours in advance of BOP test. c. If MPSP falls below 3,000 psi after CTD sidetrack, test to BOP to 3,000 high, remove third set of pipe rams. Notify AOGCC of change. d. Confirm test pressures per the Sundry Conditions of approval. e. Test VBR ram on 2-7/8” and 3-1/2” test joints. f. Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 17. Bleed any pressure off casing to the returns tank. Pull CTS plug. Bleed any pressure off tubing to the returns tank. Kill well w/ 10.1 ppg brine as needed. Pull BPV. a. If indications show pressure underneath BPV, lubricate out BPV. 18. MU landing joint or spear and PU on the tubing hanger. 19. Confirm hanger free, lay down tubing hanger. 20. POOH and lay down the 3-1/2” tubing. a. Keep all jewelry and tubing joints. b. Note any over-torqued or damaged connections and set aside for disposal. 21. PU new ESP and RIH on 2-7/8” tubing. Set base of ESP at ± 16,420’ MD. a. Check electrical continuity every 1,000’. b. Note PU and SO weights on tally. c. Install ESP clamps per ESP hand, and cross coupling clamps every other joint. d. Photograph vent packer prior to running in hole. Email: melvin.rixse@alaska.gov Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO Nom. (OD)Length Item Lb/ft Material Notes 5.85 2 Centralizer 4 ~16,420’ MD 4.5 2 Intake Sensor 30 5.62 34 Motor 80 5.2 7 Lower Tandem Seal 38 5.2 7 Upper Tandem Seal 38 5.2 8 Gas Separator 52 5.38 ~57 Pump 45 1 Ported Discharge Head 13 L-80 2-7/8" 10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 30 2-7/8" EUE 8rd L-80 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8"2 2-7/8” XN-nipple 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 60 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8"8 2-7/8" x 1" GLM, DV installed 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" ~13,160 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8"2 2-7/8” X-nipple with RHC profile 6.5 L-80 RHC Installed 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 31 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8"8 2-7/8" x 1" GLM, DV installed 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 31 2-7/8" EUE 8rd Jt 6.5 L-80 30 Packer, Reduced ID Viking ESP Retr. Dual Vent ~3,000 MD 3-1/2” 10 2-7/8" EUE 8rd x 3-1/2" EUE 8rd Jt 9.3 L-80 3-1/2" ~2,650 3-1/2" EUE 8rd Jt 9.3 L-80 3-1/2"10 3-1/2" EUE 8rd Pup Jt 9.3 L-80 3-1/2"8 3-1/2" x 1" GLM, DV installed 9.3 L-80 ~150 MD 3-1/2"10 3-1/2" EUE 8rd Pup Jt 9.3 L-80 3-1/2" 150 3-1/2" EUE 8rd Jt 9.3 L-80 3-1/2" 10 Space out pup 9.3 L-80 3-1/2" 30 Tubing Hanger with full joint 9.3 L-80 22. PU and MU Reduced ID Viking vented packer. Verify that there are four (4) setting shear pins and confirm with OE number of release shear pins. a. Target release pins to shear at 20,000 pounds overpull. Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO 23. Terminate the ESP cable and make up the ESP penetrator to the ESP cable. Ensure the 3/8” NPT control line feed thru port is dummied off. 24. Make up the control line to the dual vent valves. Pressure up on the control line to 5,000 psi and hold for 5 minutes checking for leaks (note the opening pressure in the daily report). Bleed the pressure to 500 psi and maintain 500 psi while running in hole. a. Periodically confirm control line is maintaining 500 psi. 25. Continue running ESP completion per plan. 26. PU and MU the 3-1/2” tubing hanger. Make final splice of the ESP cable to the penetrator. MU the control line to the tubing hanger and dummy off any additional control line ports if present. 27. Land tubing hanger, avoiding any damage to ESP cable or control line. RILDS. Lay down landing joint. Note PU and SO weights on tally and in daily report. 28. Drop ball and rod. 29. Pressure up on tubing to 4,000 psi and hold for 15 minutes to set the ESP packer. 30. Bleed tubing to 0 psi. 31. Pressure up on tubing to 4,000 psi and hold for 5 more minutes and then bleed to 0 psi. 32. Bleed packer control line to 0 psi, closing packer vent valves. 33. Slowly pressure up IA at 50 psi/min to 1,500 psi and hold for 30 minutes. Chart test. Bleed off at the same 50 psi/min rate posttest to ensure we do not decompress the ESP cable. 34. Lay down landing joint. 35. Set BPV. 36. RDMO ASR Post-Rig Procedure (Non-Sundried Work): Well Support 37. RD mud boat. RD BOPE house. Move to next well location. 38. RU crane. ND BOPE, set CTS plug, and NU tree. 39. Test tubing hanger void to 500 psi low/5,000 psi high. Pull CTS and BPV. 40. RD crane. Move 500 bbl returns tank and rig mats to next well location. 41. RU well house and flowlines. Slickline 42. Retrieve ball and rod, pull RHC plug 43. Set screen OV in top GLM Attachments: 1. Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Standing Orders for Open Hole Well Control during Perf Gun Deployment 5. Equipment Layout Diagram 6. ASR BOP Schematics _____________________________________________________________________________________ Revised By: TDF 8/25/2023 SCHEMATIC Milne Point Unit Well: MP F-10A Last Completed: Future PTD: 223-027 JEWELRY DETAIL No Depth Item 1 16,477’ Baker S-3 Packer 2 16,535’ 3-1/2” HES XN Nipple (2.75” ID) 3 16,547’ 3-1/2” WLEG WELL INCLINATION DETAIL KOP @ 6,000’ Max Angle is 75 deg. @ 7,500’ TREE & WELLHEAD Tree 3-1/8” 5M FMC Wellhead 11” 5M FMC Gen5A w/ FMC Tbg. Hng. 4.5” ACME Top, 3.5” EUE Btm. CIW H BPV Hanger Landing Threads 4.5” Left Hand ACME GENERAL WELL INFO API: 50-029-22679-00-00 Initial Completion by Polar 1 - 7/3/1996 20” Orig KB Elev.: 40.75’ / Orig GL Elev.: 12.5’ 7” 1 3 9-5/8” 2 Min ID 2.75” @ 16,535’ Whipstock set @ 16,700’ Top of Window @ 16,704’ TD =19,070’(MD) / TD=7,251’(TVD) PBTD =19,050’ (MD) /PBTD=7,255’(TVD) OPEN HOLE / CEMENT DETAIL 24” 250 sx Arctic Set (Approx.) 12-1/4” 1590 sx PF E, 1026 sx Class G 8-1/2” 220 sx Class G CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 19.124 Surface 112’ 0.3553 9-5/8" Surface 40 / L-80 / Buttress 8.835” Surface 8,635’ 0.0758 7” Production 26 / L-80 / BTC 6.276” Surface 9,131’ 0.0383 2-3/8” Liner 4.7 / L-80 / Hyd 511 1.995” 16,500’ 18,620’ 0.0039 TUBING DETAIL 3-1/2” Tubing 9.2 / L-80 / NSTC 2.992” Surface 16,547’ 0.0087 _____________________________________________________________________________________ Revised By: TDF 8/25/2023 PROPOSED Milne Point Unit Well: MP F-10A Last Completed: Future PTD: 223-027 JEWELRY DETAIL No Depth Item 1 ±150’ 3-1/2" x 1" GLM, DV installed 2 ±3,000’ Packer, Reduced ID Viking ESP Retr. Dual Vent 3 ±XX,XXX’ 2-7/8" x 1" GLM, DV installed 4 ±XX,XXX’ 2-7/8” X-nipple with RHC profile 5 ±XX,XXX’ 2-7/8" x 1" GLM, DV installed 6 ±XX,XXX’ 2-7/8” XN-nipple 7 ±XX,XXX’ Ported Discharge Head 8 ±XX,XXX’ Pump 9 ±XX,XXX’ Gas Separator 10 ±XX,XXX’ Upper Tandem Seal 11 ±XX,XXX’ Lower Tandem Seal 12 ±XX,XXX’ Motor 13 ±XX,XXX’ Intake Sensor & Centralizer – Btm @ ±16,420’ 14 16,477’ Baker S-3 Packer 15 16,535’ 3-1/2” HES XN Nipple (2.75” ID) 16 16,547’ 3-1/2” WLEG PERFORATION DETAIL Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD)FT Date Status Size Kuparuk A ±17,600’ ±18,600’ ±7,210’ ±7,170’ 1,000 Future Future TBD WELL INCLINATION DETAIL KOP @ 6,000’ Max Angle is 75 deg. @ 7,500’ TREE & WELLHEAD Tree 3-1/8” 5M FMC Wellhead 11” 5M FMC Gen5A w/ FMC Tbg. Hng. 4.5” ACME Top, 3.5” EUE Btm. CIW H BPV Hanger Landing Threads 4.5” Left Hand ACME GENERAL WELL INFO API: 50-029-22679-00-00 Initial Completion by Polar 1 - 7/3/1996 20” Orig KB Elev.: 40.75’ / Orig GL Elev.: 12.5’ 7” 4 7 9 10 & 11 1 3 9-5/8” 6 2 5 8 Min ID 2.75” @ 16,535’ 12 13 Whipstock set @ 16,700’ Top of Window @ 16,704’ TD = 19,070’ (MD) / TD =7,251’(TVD) PBTD =19,050’ (MD) /PBTD=7,255’(TVD) Proposed Tubing Cut @ ±16,450’ 14 15 16 OPEN HOLE / CEMENT DETAIL 24” 250 sx Arctic Set (Approx.) 12-1/4” 1590 sx PF E, 1026 sx Class G 8-1/2” 220 sx Class G CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 19.124 Surface 112’ 0.3553 9-5/8" Surface 40 / L-80 / Buttress 8.921” Surface 8,635’ 0.0758 7” Production 26 / L-80 / BTC 6.276” Surface 9,131’ 0.0383 2-3/8” Liner 4.7 / L-80 / Hyd 511 1.995” 16,500’ 18,620’ 0.0039 TUBING DETAIL 3-1/2” Tubing 9.2 / L-80 / NSTC 2.992 Surface ±2,650’ 0.0087 2-7/8” Tubing 6.4 / L-80 / EUE 8rd 2.441 ±2,650’ ±16,420’ 0.0058 3-1/2” Tubing 9.2 / L-80 / NSTC 2.992”±16,450’16,547’ 0.0087 Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO Coiled Tubing BOPE Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO Standing Orders for Open Hole Well Control during Perf Gun Deployment Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO Equipment Layout Diagram Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO Double Ram BOPE Well: MPU F-10A Scope: Post-CTD APERF + ESP RWO Triple Ram BOPE Shaffer 11'’-5000 CIW-U 4.30'Hydril GK 11" - 5000 2-7/8" x 5" VBR Blind 11'’- 5000 2 1/16 5M Kill Line Valves 2 1/16 5M Choke Line Valves HCRManualManual Stripping Head ManualManual 2-7/8" x 5" VBR Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Monty Myers Drilling Manager Hilcorp Alaska LLC 3800 Centerpoint Dr, Suite 1400 Anchorage, AK, 99503 Re: Milne Point, Kuparuk River Oil, MPU F-10A Hilcorp Alaska, LLC Permit to Drill Number: 223-027 Surface Location: 270’ 1824' FSL, 2855' FEL, Sec. 06, T13N, R10E, UM, AK Bottomhole Location: 1210' FNL, 1014' FEL, Sec. 26, T14N, R09E, UM, AK Dear Mr. Meyers: Enclosed is the approved application for the permit to drill the above referenced well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for all well logs run must be submitted to the AOGCC within 90 days after completion, suspension, or abandonment of this well, or within 90 days of acquisition of the data, whichever occurs first. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Brett W. Huber, Sr. Chair, Commissioner DATED this ___ day of June, 2023. 6 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.06.05 14:19:57 -08'00' 1a. Contact Name:Trevor Hyatt Contact Email:trevor.hyatt@hilcorp.comAuthorized Name: Monty Myers Authorized Title:Drilling Manager Authorized Signature: Contact Phone:907-777-8396 Approved by:COMMISSIONER APPROVED BY THE COMMISSION Date: … 21. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Drill Type of Work: Redrill 5 Lateral … … 1b.Proposed Well Class:Exploratory - Gas 5 Service - WAG 5 1c. Specify if well is proposed for: … Development - Oil Service - Winj Multiple Zone ……Exploratory - Oil …… …Gas Hydrates … Geothermal …… Hilcorp Alaska, LLC Bond No. 22224484 11.Well Name and Number: MPU F-10A TVD:19070'7251' 12. Field/Pool(s): MILNE POINT, KUPARUK RIVER OIL MD: ADL 025509, 355235 & 355018 94-019 June 1, 2023 4a. Surface: Top of Productive Horizon: Total Depth: 1824' FSL, 2855' FEL, Sec. 06, T13N, R10E, UM, AK 1827' FSL, 1334' FEL, sec. 26, T14N, R09E, UM, AK Kickoff Depth: 16704 feet Maximum Hole Angle: 101 degrees Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole:Surface:3440 2720 16.Deviated wells: 17. Surface: x-y- Zone -541709 6035275 4 10. KB Elevation above MSL: GL Elevation above MSL: feet feet 40.75 12.5 15.Distance to Nearest Well Open to Same Pool: Cement Quantity, c.f. or sacks MD Casing Program: 16500'7089' 19.PRESENT WELL CONDITION SUMMARY Production 80 250 sx Arctic Set (Approx.) 17100 7504 None 16997 7434 None 32 - 112 Surface 1590 sx PF E, 1026 sx Class G 7215 - 7265 Seabed Report …Drilling Fluid Program 5 20 AAC 25.050 requirements …Shallow Hazard Analysis 5… Commission Use Only See cover letter for other requirements: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales:… Samples req'd: Yes …No … H2S measures Yes …No … Spacing exception req'd: Yes …No … Mud log req'd: Yes …No … Directional svy req'd: Yes …No … Inclination-only svy req'd: Yes …No … Other: Date: Address: Location of Well (State Base Plane Coordinates - NAD 27): 4.6# 8604 16679 - 16750 50-029-22679-01-00 Intermediate Conductor/Structural Single Zone Service - Disp … … … …No…YesPost initial injection MIT req'd: No…Yes 5 Diverter Sketch Comm. TVD API Number: MD Sr Pet Geo 1210' FNL, 1014' FEL, Sec. 26, T14N, R09E, UM, AK Time v. Depth Plot…5 5 …Drilling Program 7870' (To be completed for Redrill and Re-Entry Operations) 20" 9-5/8" Hyd 511 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 Stratigraphic Test … Development - Gas Service - Supply Coalbed Gas Shale Gas 2.Operator Name:5.Bond Blanket 5 Single Well … 3. 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 6. Proposed Depth: 7. Property Designation (Lease Number): 8. DNR Approval Number:13.Approximate spud date: 9.Acres in Property: 14. Distance to Nearest Property: Location of Well (Governmental Section): 4b. 7656 2453' 18.Specifications Top - Setting Depth - Bottom Casing Weight Grade TVDHole Coupling Length TVD (including stage data) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured):Effect. Depth MD (ft): Effect. Depth TVD (ft):Junk (measured): Casing Length Size MD 32 - 112 31 - 8635 31 - 4484 17051 7"220 sx Class G 29 - 17080 29 - 7490 Liner Perforation Depth MD (ft):Perforation Depth TVD (ft): 20. Attachments Property Plat BOP Sketch Permit to Drill Number: Permit Approval Date: Reentry Hydraulic Fracture planned? Sr Pet Eng Sr Res Eng Cement Volume Comm. 19070'7251'102 sx Class G3-1/4"2-3/8"L-80 2570' Form 10-401 Revised 3/2021 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) 3.23.2023 By Samantha Carlisle at 3:00 pm, Mar 23, 2023 Digitally signed by Monty M Myers DN: cn=Monty M Myers, c=US, o=Hilcorp Alaska, LLC, ou=Technical Services - AK Drilling, email=mmyers@hilcorp.com Reason: I am approving this document Date: 2023.03.23 12:55:53 -08'00' Monty M Myers BOPE test to 3500 psi. 2720 SFD 5/18/2023 DSR-3/28/23 Variance to 20 AAC 25.112(i) approved for alternate plug placement for abandonment of parent well. 223-027 MGR02JUN2023 388235 SFD GCW 06/05/2023JLC 6/5/2023 06/06/23 06/06/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.06.05 14:20:15 -08'00' To: Alaska Oil & Gas Conservation Commission From: Trevor Hyatt Drilling Engineer Date: March 23, 2023 Re: MPU F-10A Permit to Drill Approval is requested for drilling a CTD sidetrack lateral from well MPU F-10 with the Nabors CDR2 Coiled Tubing Drilling. Proposed plan for MPU F-10A Producer: See MPU F-10 Sundry request for complete pre-rig details - Prior to drilling activities, screening will be conducted to MIT and drift for whipstock. E-line or Service Coil will mill the XN-nipple. A coil tubing drilling sidetrack will be drilled with the Nabors CDR2 rig. The rig will move in, test BOPE and kill the well. The rig will set a 3-1/2"x7" whipstock and mill a single string 2.80" window + 10' of formation. The well will kick off drilling and land in the Kuparuk. The lateral will continue in the Kuparuk to TD. The proposed sidetrack will be completed with a 2-3/8” L-80 solid liner and cemented. This completion WILL abandon the parent Kuparuk perfs. The well will be perforated post rig (see future perf sundry). The following describes the work planned. A wellbore schematic of the current well and proposed sidetrack is attached for reference. Pre-Rig Work: x Reference MPU F-10 Sundry submitted in concert with this request for full details. x General work scope of Pre-Rig work: 1. Slickline: Dummy WS drift 2. E-Line or Coil: Mill XN-nipple 3. Fullbore: MITs Rig Work - (Estimated to start in June 2023): 1. MIRU and test BOPE to 3500 psi. MASP with gas (0.10 psi/ft) to surface is 2,720 psi a. Give AOGCC 24hr notice prior to BOPE test b. Test against swab and master valves (No TWC) c. Load pits with drilling fluid d. Open well and ensure zero pressure 2. Set 3-1/2”x7” Whipstock (HEW) a. Set top of whipstock at 16,700’ MD b. Set 0° ROHS 3. Mill 2.80” single string window (out of 7”) plus 10’ of rathole a. Top of window is top of whipstock (whipstock pinch point) b. Hold 11.8 ppg MPD while milling window 4. Drill – Build & Lateral a. 2-3/8” BHA with GR/RES / Bi-center Bit (3.25”) b. 42° DLS build section – 225’ MD / Planned TD 16,929’ MD c. 12° DLS lateral section – 2,141’ MD / Planned TD 19,070’ MD d. Drill with a constant bottom hole pressure for entire sidetrack e. Pressure deployment will be utilized f. After TD and on the last trip out of hole lay in completion/kill weight fluid in preparation for liner run g. No flow test prior to laying down drilling BHA Sundry 323-183 PTD223-027 5. Run and Cement 2-3/8” L-80 solid liner a. Have 2” safety joint with TIW valve ready to be picked up while running liner b. Release from liner and come out of hole. c. Make up cementing BHA and sting into liner shoe. Swap the well over to 2% KCl. d. Cement liner with 22.5 bbls, 15.3 ppg Class G (TOC to TOL).* e. Freeze protect well from ~2200’ TVD (min) f. RDMO Post Rig: 1. V: Valve & tree work 2. S: Set LTP* (if necessary) 3. C: Post rig perforate ~1400’ (see future perf sundry) 4. S: Set live LGLVs 5. T: Portable test separator flowback * Approved alternate plug placement per 20 AAC 25.112(i) Managed Pressure Drilling: Managed pressure drilling techniques will be employed on this well. The intent is to provide constant bottom hole pressure by using minimum 8.4 ppg drilling fluid in combination with annular friction losses and applied surface pressure. Constant BHP will be utilized to reduce pressure fluctuations to help with hole stability. Applying annular friction and choke pressure also allow use of lighter drilling fluid and minimizes fluid losses and/or fracturing at the end of the long well bores. A MPD choke for regulating surface pressure and is independent of the WC choke. Deployment of the BHA under trapped wellhead pressure will be necessary. Pressure deployment of the BHA will be accomplished utilizing 3” (bighole) & 2-3/8” (slimhole) pipe/slip rams (see attached BOP configurations). The annular preventer will act as a secondary containment during deployment and not as a stripper. Operating parameters and fluid densities will be adjusted based on real-time bottom hole pressure measurements while drilling and shale behavior. The following scenario is expected: MPD Pressure at the Planned Window (16,704’ MD - 7,232’ TVD) Pumps On Pumps Off A Target BHP at Window (ppg)4,438 psi 4,438 psi 11.8 B Annular friction - ECD (psi/ft)1,236 psi 0 psi 0.07 C Mud Hydrostatic (ppg)3,197 psi 3,197 psi 8.5 B+C Mud + ECD Combined 4,433 psi 3,197 psi (no choke pressure) A-(B+C)Choke Pressure Required to Maintain 5 psi 1,241 psi Target BHP at window and deeper Operation Details: Reservoir Pressure: x The estimated reservoir pressure is expected to be 3,440 psi at 7,200’ TVD (9.2 ppg equivalent). x Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,720 psi (from estimated reservoir pressure). gg Managed pressure drilling techniques will be employed on this well. Mud Program: x Drilling: Minimum MW of 8.4 ppg KCL with Geovis for drilling. Managed pressure used to maintain constant BHP. x KWF will be stored on location. The tankage will contain 1.5 wellbore volumes of KWF to exceed the maximum possible BHP to be encountered as the lateral is drilled. Adjust with real time BHP monitoring. x Completion: A minimum MW 8.4 ppg KWF to be used for liner deployment. Will target 11.8 ppg to match managed pressure target. Disposal: x All Class l & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4. x Fluids >1% hydrocarbons or flammables must go to GNI. x Fluids >15% solids by volume must go to GNI. x Fluids with solids that will not pass through 1/4” screen must go to GNI. x Fluids with PH >11 must go to GNI. Hole Size: x 3.25” hole for the entirety of the production hole section. Liner Program: x 2-3/8”, 4.6#, L-80 solid/cemented liner: 16,500’ MD – 19,070’ MD (2,570’ liner) x The primary barrier for this operation: Kill Weight Fluid to provide overbalance as necessary x A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: x BOP diagram is attached. MPD and pressure deployment is planned. x Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. x The annular preventer will be tested to 250 psi and 2,500 psi. x 1.5 wellbore volumes of KWF will be on location at all times during drilling operations. x A X-over shall be made up to a 2” safety joint including a TIW valve for all tubulars ran in hole. x 2” safety joint will be utilized while running solid or slotted liner. The desire is to keep the same standing orders for the entire liner run and not change shut in techniques from well to well (run safety joint with pre- installed TIW valve). When closing on a 2” safety joint, 2 sets of pipe/slip rams will be available, above and below the flow cross providing better well control option. Directional: x Directional plan attached. Maximum planned hole angle is 101°. Inclination at kick off point is 45°. x Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. x Distance to nearest property line – 7,870’ x Distance to nearest well within pool – 2,453’ Logging: x MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. x Real time bore pressure to aid in MPD and ECD management. Perforating: x ~1400’ perforated post rig – See future perf/frac sundry. x If deemed necessary, the rig will perforate under this PTD (1-11/16” Perf Guns at 6 spf). Anti-Collision Failures: x All wells pass AC with WP04. Hazards: x The highest recorded H2S well on the pad was from MPU F-69 (47 ppm) in 2009. Last recorded H2S on MPU F-10 was 0 ppm in 2009. x One fault crossing expected. x Medium lost circulation risk. Trevor Hyatt CC: Well File Drilling Engineer (907-223-3087) Joseph Lastufka _____________________________________________________________________________________ Modified: JNL 2/23/23 PROPOSED SCHEMATIC Milne Point Unit Well: MP F-10 Last Completed: 7/3/1996 PTD: 196-094 NOTE: Landing Thread on Hanger is 4.5” LEFT HAND ACME CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 Surface 112’ 9-5/8" Surface 40 / L-80 / Buttress 8.921” Surface 8,635’ 0.0758 7” Production 26 / L-80 / BTC 6.276” Surface 17,080’ 0.0383 TUBING DETAIL 3-1/2” Tubing 9.2 / L-80 / NSTC 2.867” Surf 16,547’ 0.0087 JEWELRY DETAIL No Depth Item 1 16,477’ Baker S-3 Packer 2 16,535’ 3-1/2” HES XN Nipple (2.75” ID) 3 16,547’ 3-1/2” WLEG 4 16,700’ Whipstock PERFORATION DETAIL Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD)FT Date Status Size Kuparuk C / A 16,679’ 16,699’ 7,215’ 7,229’ 20 7/17/96 Open 2” 4SPF Kuparuk A 16,707’ 16,750’ 7,235’ 7,265’ 43 7/17/96 Open 2” 4SPF WELL INCLINATION DETAIL KOP @ 6,000’ Max Angle is 75 deg. @ 7,500’ TREE & WELLHEAD Tree 3-1/8” 5M FMC Wellhead 11” 5M FMC Gen5A w/ FMC Tbg. Hng. 4.5” LH ACME Top, 3.5” EUE Btm. CIW H BPV GENERAL WELL INFO API: 50-029-22679-00-00 Initial Completion by Polar 1 - 7/3/1996 OPEN HOLE / CEMENT DETAIL 24” 250 sx Arctic Set (Approx.) 12-1/4” 1590 sx PF E, 1026 sx Class G 8-1/2” 220 sx Class G TD =17,100’(MD) / TD =7,504’(TVD) 20” Orig KB Elev.: 40.75’ / Orig GL Elev.: 12.5’ 7” 1 3 9-5/8” PBTD =16,997’ (MD) / PBTD =7,434’(TVD) Whipstock set @ 16,700’ 2 Min ID 2.75” @ 16,535’ Milled to 2.80” pre CTD _____________________________________________________________________________________ Modified: JNL 2/23/23 PROPOSED SCHEMATIC Milne Point Unit Well: MP F-10A Last Completed: TBD PTD: TBD CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 Surface 112’ 9-5/8" Surface 40 / L-80 / Buttress 8.921” Surface 8,635’ 0.0758 7” Production 26 / L-80 / BTC 6.276” Surface 16,704’ 0.0383 2-3/8” Liner 4.7 / L-80 / Hyd 511 1.995” 16,500’ 19,070’ 0.0039 TUBING DETAIL 3-1/2” Tubing 9.2 / L-80 / NSTC 2.867” Surf 16,547’ 0.0087 JEWELRY DETAIL No Depth Item 1 16,477’ Baker S-3 Packer 2 16,535’ 3-1/2” HES XN Nipple (2.75” ID)– milled pre-rig to 2.80” 3 16,547’ 3-1/2” WLEG 4 16,700’ Whipstock (top of window – pinch point at 16,704’ MD) PERFORATION DETAIL Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD)FT Date Status Size WELL INCLINATION DETAIL KOP @ 16,704’ 90 deg Angle @ 16,824’ REE & WELLHEAD Tree 3-1/8” 5M FMC Wellhead 11” 5M FMC Gen5A w/ FMC Tbg. Hng. 4.5” LH ACME Top, 3.5” EUE Btm. CIW H BPV GENERAL WELL INFO API: 50-029-22679-01-00 Initial Completion by Polar 1 - 7/3/1996 A Sidetrack Completed by CDR2: TBD NOTE: Landing Thread on Hanger is 4.5” LEFT HAND ACME OPEN HOLE / CEMENT DETAIL 24” 250 sx Arctic Set (Approx.) 12-1/4” 1590 sx PF E, 1026 sx Class G 8-1/2” 220 sx Class G 3-1/4” 102 sx Class G TD =19,070’(MD) / TD=7,251’(TVD) 20” Orig KB Elev.: 40.75’ / Orig GL Elev.: 12.5’ 7” 1 3 9-5/8” PBTD =19,050’ (MD) /PBTD=7,255’(TVD) Whipstock set @ 16,700’ Top of Window @ 16,704’ 2 2-3/8” Top of Liner / Cement @ 16,500’ Min ID 2.75” @ 16,535’ Milled to 2.80” pre CTD 6WDQGDUG3URSRVDO5HSRUW 0DUFK 3ODQ038)$ZS +LOFRUS$ODVND//& 0LOQH3RLQW 03W)3DG 03) 038)$ 630065336767700072337467True Vertical Depth (350 usft/in)-467 -233 0 233 467 700 93311671400 1633 1867 2100 2333 2567 2800Vertical Section at 8.77° (350 usft/in)MPF-10A wp04 tgt 2MPF-10A wp04 tgt 3MPF-10A wp04 tgt 1MPF-10A wp04 tgt 4MPF-10A wp04 drilling polygon16000165001700017100MPF-107" TOW2 3/8" x 3 1/2"170 00 17 50 0 18 00 018500190 0 0 1 9 0 7 0 MPU F-10A wp04KOP : Start Dir 10º/100' : 16704' MD, 7232.61'TVD : 0° RT TFStart Dir 42º/100' : 16724' MD, 7246.36'TVDStart Dir 12º/100' : 16929' MD, 7280.18'TVDStart Dir 11.99º/100' : 17924' MD, 7223.88'TVDStart Dir 12º/100' : 18084' MD, 7221.53'TVDStart Dir 11.99º/100' : 19029' MD, 7258.48'TVDTotal Depth : 19070' MD, 7250.95' TVDWELL DETAILS: MPF-10 NAD 1927 (NADCON CONUS) Alaska Zone 04Ground Level:12.50+N/-S +E/-W Northing Easting Latitude Longitude0.00 0.006035275.210 541709.474 70° 30' 26.2499 N 149° 39' 31.5052 WCASING DETAILSTVD TVDSS MD Size Name7233.31 7192.56 16705.00 7 7" TOW7250.95 7210.20 19070.00 2-3/8 2 3/8" x 3 1/2"Project: Milne PointSite: M Pt F PadWell: MPF-10Wellbore: MPU F-10ADesign: MPU F-10A wp04SECTION DETAILSSec MD Inc Azi TVD +N/-S +E/-W Dleg TFace VSect Target Annotation1 16704.00 45.55 319.97 7232.61 10573.77 -8920.05 0.00 0.00 0.00 KOP : Start Dir 10º/100' : 16704' MD, 7232.61'TVD : 0° RT TF2 16724.00 47.55 319.97 7246.36 10584.89 -8929.39 10.00 0.00 9.56 Start Dir 42º/100' : 16724' MD, 7246.36'TVD3 16824.00 89.55 319.97 7282.12 10654.56 -8987.93 42.00 0.00 69.504 16929.00 92.46 3.98 7280.18 10751.94 -9019.64 42.00 86.00 160.91 Start Dir 12º/100' : 16929' MD, 7280.18'TVD5 17184.00 93.90 34.60 7265.69 10989.39 -8936.58 12.00 86.50 408.256 17464.00 93.25 0.93 7247.71 11251.69 -8852.58 12.00 -90.00 680.287 17664.00 92.97 24.97 7236.70 11444.88 -8808.15 12.00 90.00 877.998 17924.00 92.54 353.74 7223.88 11697.95 -8766.47 12.00 -90.00 1134.45 Start Dir 11.99º/100' : 17924' MD, 7223.88'TVD9 18084.00 89.13 12.63 7221.53 11856.94 -8757.61 11.99 100.00 1292.94 Start Dir 12º/100' : 18084' MD, 7221.53'TVD10 18204.00 85.22 26.51 7227.47 11969.58 -8717.59 12.00 106.02 1410.3611 18484.00 84.91 352.79 7252.27 12240.58 -8671.49 12.00 -92.01 1685.2212 18744.00 85.65 24.09 7274.21 12493.66 -8633.90 12.00 90.00 1941.0713 19029.00 100.54 353.17 7258.48 12770.75 -8591.29 12.00 -64.00 2221.42 Start Dir 11.99º/100' : 19029' MD, 7258.48'TVD14 19070.00 100.63 358.17 7250.95 12810.93 -8594.34 11.99 88.49 2260.66 Total Depth : 19070' MD, 7250.95' TVDSURVEY PROGRAMDate: 2023-03-21T00:00:00 Validated: Yes Version: Depth From Depth To Survey/Plan Tool100.00 8100.00 1 : Gyrodata gyrocompassing m/ (MPF-10) 3_Gyro-CT_Drill pipe8132.64 16704.00 2 : MWD - Standard (MPF-10) 3_MWD16704.00 19070.00 MPU F-10A wp04 (MPU F-10A) 3_MWD 10325 10500 10675 10850 11025 11200 11375 11550 11725 11900 12075 12250 12425 12600 12775 12950 13125 South(-)/North(+) (350 usft/in)-9625 -9450 -9275 -9100 -8925 -8750 -8575 -8400 -8225 -8050 -7875 -7700 -7525 -7350 West(-)/East(+) (350 usft/in) MPF-10A wp04 drilling polygon MPF-10A wp04 tgt 4 MPF-10A wp04 tgt 1 MPF-10A wp04 tgt 3 MPF-10A wp04 tgt 2 700072507504MPF-107" TOW 2 3/8" x 3 1/2" 725 1 MPU F-10A wp04 KOP : Start Dir 10º/100' : 16704' MD, 7232.61'TVD : 0° RT TF Start Dir 42º/100' : 16724' MD, 7246.36'TVD Start Dir 12º/100' : 16929' MD, 7280.18'TVD Start Dir 11.99º/100' : 17924' MD, 7223.88'TVD Start Dir 12º/100' : 18084' MD, 7221.53'TVD Start Dir 11.99º/100' : 19029' MD, 7258.48'TVD Total Depth : 19070' MD, 7250.95' TVD CASING DETAILS TVD TVDSS MD Size Name 7233.31 7192.56 16705.00 7 7" TOW 7250.95 7210.20 19070.00 2-3/8 2 3/8" x 3 1/2" Project: Milne Point Site: M Pt F Pad Well: MPF-10 Wellbore: MPU F-10A Plan: MPU F-10A wp04 WELL DETAILS: MPF-10 Ground Level: 12.50 +N/-S +E/-W Northing Easting Latitude Longitude 0.00 0.00 6035275.210 541709.474 70° 30' 26.2499 N 149° 39' 31.5052 W REFERENCE INFORMATION Co-ordinate (N/E) Reference:Well MPF-10, True North Vertical (TVD) Reference:MPU F-10 @ 40.75usft Measured Depth Reference:MPU F-10 @ 40.75usft Calculation Method:Minimum Curvature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ƒ6ORW5DGLXV    ƒ 1 ƒ : :HOO :HOO3RVLWLRQ /RQJLWXGH /DWLWXGH (DVWLQJ 1RUWKLQJ XVIW (: 16 3RVLWLRQ8QFHUWDLQW\ XVIW XVIW XVIW*URXQG/HYHO 03)03) XVIW XVIW     :HOOKHDG(OHYDWLRQXVIW ƒ 1 ƒ : :HOOERUH 'HFOLQDWLRQ ƒ )LHOG6WUHQJWK Q7 6DPSOH'DWH 'LS$QJOH ƒ 038)$ 0RGHO1DPH0DJQHWLFV %**0     3KDVH9HUVLRQ $XGLW1RWHV 'HVLJQ 038)$ZS 3/$1 9HUWLFDO6HFWLRQ 'HSWK)URP 79' XVIW 16 XVIW 'LUHFWLRQ ƒ (: XVIW 7LH2Q'HSWK  ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 7RRO)DFH ƒ 16 XVIW 0HDVXUHG 'HSWK XVIW 9HUWLFDO 'HSWK XVIW 'RJOHJ 5DWH ƒXVIW %XLOG 5DWH ƒXVIW 7XUQ 5DWH ƒXVIW 3ODQ6HFWLRQV 79' 6\VWHP XVIW               $0 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W)3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03) 038)$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 038)#XVIW 'HVLJQ038)$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH038)#XVIW 1RUWK5HIHUHQFH :HOO03) 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                                                                                                                                                                                                                  $0 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W)3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03) 038)$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 038)#XVIW 'HVLJQ038)$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH038)#XVIW 1RUWK5HIHUHQFH :HOO03) 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                                                                                                                                                                                                                         $0 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W)3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03) 038)$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 038)#XVIW 'HVLJQ038)$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH038)#XVIW 1RUWK5HIHUHQFH :HOO03) 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                                                                                                                                                                                                                  $0 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W)3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03) 038)$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 038)#XVIW 'HVLJQ038)$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH038)#XVIW 1RUWK5HIHUHQFH :HOO03) 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                                                                                                                                                                                                                         $0 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W)3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03) 038)$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 038)#XVIW 'HVLJQ038)$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH038)#XVIW 1RUWK5HIHUHQFH :HOO03) 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                                                                                                                 .236WDUW'LUž  0' 79'ƒ577)         72:         6WDUW'LUž  0' 79'                                                                                 $0 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W)3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03) 038)$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 038)#XVIW 'HVLJQ038)$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH038)#XVIW 1RUWK5HIHUHQFH :HOO03) 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                 6WDUW'LUž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ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                         6WDUW'LUž  0' 79'                                                                 6WDUW'LUž  0' 79'                                                                                                                                                                                                 $0 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W)3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03) 038)$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 038)#XVIW 'HVLJQ038)$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH038)#XVIW 1RUWK5HIHUHQFH :HOO03) 7UXH 0HDVXUHG 'HSWK XVIW ,QFOLQDWLRQ ƒ $]LPXWK ƒ (: XVIW 0DS 1RUWKLQJ XVIW 0DS (DVWLQJ XVIW 16 XVIW 3ODQQHG6XUYH\ 9HUWLFDO 'HSWK XVIW 79'VV XVIW '/6  9HUW6HFWLRQ                                                                                                                                                 6WDUW'LUž  0' 79'                 7RWDO'HSWK 0' 79'[ $0 &203$66%XLOG(3DJH 3URMHFW &RPSDQ\ /RFDO&RRUGLQDWH5HIHUHQFH 79'5HIHUHQFH 6LWH +LOFRUS$ODVND//& 0LOQH3RLQW 03W)3DG 6WDQGDUG3URSRVDO5HSRUW :HOO :HOOERUH 03) 038)$ 6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH 038)#XVIW 'HVLJQ038)$ZS 'DWDEDVH1257+86&$1$'$ 0'5HIHUHQFH038)#XVIW 1RUWK5HIHUHQFH :HOO03) 7UXH 7DUJHW1DPH KLWPLVVWDUJHW 6KDSH 79' XVIW 1RUWKLQJ XVIW (DVWLQJ XVIW 16 XVIW (: XVIW 7DUJHWV 'LS$QJOH ƒ 'LS'LU ƒ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ž  0' 79'ƒ577)     6WDUW'LUž  0' 79'     6WDUW'LUž  0' 79'     6WDUW'LUž  0' 79'     6WDUW'LUž  0' 79'     6WDUW'LUž  0' 79'     7RWDO'HSWK 0' 79' $0 &203$66%XLOG(3DJH &OHDUDQFH6XPPDU\$QWLFROOLVLRQ5HSRUW0DUFK+LOFRUS$ODVND//&0LOQH3RLQW03W)3DG03)038)$038)$ZS5HIHUHQFH'HVLJQ03W)3DG03)038)$038)$ZS&ORVHVW$SSURDFK'3UR[LPLW\6FDQRQ&XUUHQW6XUYH\'DWD +LJKVLGH5HIHUHQFH :HOO&RRUGLQDWHV1( ƒ 1ƒ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eparation Factor16800 16950 17100 17250 17400 17550 17700 17850 18000 18150 18300 18450 18600 18750 18900 19050 19200Measured DepthMPF-10MPU F-22L1-01 wp06aMPF-29MPF-42MPF-79MPF-79PB1MPF-90MPF-90PB1No-Go Zone - Stop DrillingCollision Avoidance RequiredCollision Risk Procedures Req.WELL DETAILS:MPF-10 NAD 1927 (NADCON CONUS)Alaska Zone 04Ground Level: 12.50+N/-S +E/-W Northing EastingLatitudeLongitude0.000.006035275.210541709.47470° 30' 26.2499 N 149° 39' 31.5052 WREFERENCE INFORMATIONCo-ordinate (N/E) Reference:Well MPF-10, True NorthVertical (TVD) Reference: MPU F-10 @ 40.75usftMeasured Depth Reference:MPU F-10 @ 40.75usftCalculation Method:Minimum CurvatureSURVEY PROGRAMDate: 2023-03-21T00:00:00 Validated: Yes Version: Depth From Depth To Survey/PlanTool100.00 8100.00 1 : Gyrodata gyrocompassing m/ (MPF-10) 3_Gyro-CT_Drill pipe8132.64 16704.00 2 : MWD - Standard (MPF-10) 3_MWD16704.00 19070.00 MPU F-10A wp04 (MPU F-10A) 3_MWD0.0035.0070.00105.00140.00175.00Centre to Centre Separation (60.00 usft/in)16800 16950 17100 17250 17400 17550 17700 17850 18000 18150 18300 18450 18600 18750 18900 19050 19200Measured DepthGLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference16704.00 To 19070.00Project: Milne PointSite: M Pt F PadWell: MPF-10Wellbore: MPU F-10APlan: MPU F-10A wp04CASING DETAILSTVD TVDSS MD Size Name7233.31 7192.56 16705.00 7 7" TOW7250.95 7210.20 19070.00 2-3/8 2 3/8" x 3 1/2" Well Date Quick Test Sub to Otis -1.1 ft Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular 2.75 ft C L Annular 3.40 ft Bottom Annular 4.75 ft CL Blind/Shears 6.09 ft CL 2.0" Pipe / Slips 6.95 ft B3 B4 B1 B2 Kill Line Choke Line CL 2-3/8" Pipe / Slip 9.54 ft CL 2.0" Pipe / Slips 10.40 ft TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level 3" LP hose open ended to Flowline CDR2-AC BOP Schematic CDR2 Rig's Drip Pan Fill Line from HF2 Normally Disconnected 3" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2.0" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2.0" Pipe/Slips 2-3/8" Pipe / Slip HF nneceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee Revised 7/2022 TRANSMITTAL LETTER CHECKLIST WELL NAME:______________________________________ PTD:_____________________________________________ ___ Development ___ Service ___ Exploratory ___ Stratigraphic Test ___ Non-Conventional FIELD:__________________________POOL:____________________________________ Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL (If last two digits in API number are between 60-69) The permit is for a new wellbore segment of existing well Permit Number _____________, API Number 50-______________________. Production from or injection into this wellbore must be reported under the original API Number stated above. Spacing Exception The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce or inject is contingent upon issuance of a conservation order approving a spacing exception. The Operator assumes the liability of any protest to the spacing exception that may occur. Dry Ditch Sample All dry ditch sample sets submitted to the AOGCC must be in nogreater than 30-foot sample intervals from below the permafrost or from where samples are first caught and 10-foot sample intervals through target zones. Non- Conventional Well Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for this well until after the Operator has designed and implemented a water-well testing program to provide baseline data on water quality and quantity. The Operator must contact the AOGCC to obtain advance approval of such a water-well testing program. Well Logging Requirements Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by the Operator in the attached application, the following well logs are also required for this well: Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for all well logs run must be submitted to the AOGCC within 90 days after completion, suspension, or abandonment of this well, or within 90 days of acquisition of the data, whichever occurs first. 223-027 KUPARUK RIVER OIL MPU_F-10A MILNE POINT WELL PERMIT CHECKLISTCompanyHilcorp Alaska, LLCWell Name:MILNE PT UNIT F-10AInitial Class/TypeDEV / PENDGeoArea890Unit11328On/Off ShoreOnProgramDEVField & PoolWell bore segAnnular DisposalPTD#:2230270MILNE POINT, KUPARUK RIVER OIL - 525100NA1 Permit fee attachedYes Surf Loc, Top PI & TD lie within ADL0025509.Portion of Well Passes Thru ADL0388235; 2 Lease number appropriateYes Top Prod Int & TD lie within ADL0355018.3 Unique well name and numberYes MILNE POINT, KUPARUK RIVER OIL4 Well located in a defined poolYes5 Well located proper distance from drilling unit boundaryYes6 Well located proper distance from other wellsYes7 Sufficient acreage available in drilling unitYes8 If deviated, is wellbore plat includedYes9 Operator only affected partyYes10 Operator has appropriate bond in forceYes11 Permit can be issued without conservation orderYes12 Permit can be issued without administrative approvalYes13 Can permit be approved before 15-day waitNA14 Well located within area and strata authorized by Injection Order # (put IO# in comments) (For sNA15 All wells within 1/4 mile area of review identified (For service well only)NA16 Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)Yes This well is an inzone sidetrack with a parent well with approved integrity.18 Conductor string providedYes This well is an inzone sidetrack with a parent well with approved integrity.19 Surface casing protects all known USDWsYes This well is an inzone sidetrack with a parent well with approved integrity.20 CMT vol adequate to circulate on conductor & surf csgNo This well is an inzone sidetrack with a parent well with approved integrity.21 CMT vol adequate to tie-in long string to surf csgYes This well is an inzone sidetrack with a parent well with approved integrity.22 CMT will cover all known productive horizonsYes This well is an inzone sidetrack with a parent well with approved integrity.23 Casing designs adequate for C, T, B & permafrostYes CDR2 has adequate tankage and good trucking support.24 Adequate tankage or reserve pitYes Approved sundry 323-18325 If a re-drill, has a 10-403 for abandonment been approvedYes Halliburton collision scan identifies no close approaches26 Adequate wellbore separation proposedNA This well is an inzone sidetrack with a parent well with approved integrity.27 If diverter required, does it meet regulationsYes28 Drilling fluid program schematic & equip list adequateYes 1 CT packoff, 1 annular, 4 ram - 7-1/16" stack. 2 MPD flow cross29 BOPEs, do they meet regulationYes 5000 psi MPD stack tested to 3500 psi.30 BOPE press rating appropriate; test to (put psig in comments)Yes31 Choke manifold complies w/API RP-53 (May 84)Yes32 Work will occur without operation shutdownNo No H2S on MPU F pad greater than 47 ppm.33 Is presence of H2S gas probableNA34 Mechanical condition of wells within AOR verified (For service well only)No H2S: F-Pad wells are H2S-bearing, measures required.35 Permit can be issued w/o hydrogen sulfide measuresYes Expected Press Grad is 0.48 psi/ft (9.2 EMW). Managed Pressure Drilling will be used to mitigate36 Data presented on potential overpressure zonesNA any over-pressure encountered and wellbore instability.37 Seismic analysis of shallow gas zonesNA Faulting: high risk; one crossing expected; see p. 4.38 Seabed condition survey (if off-shore)NA Lost Circulation: medium risk; see p. 4. 1.5 wellbore volumes of kill-weight fluid will be available.39 Contact name/phone for weekly progress reports [exploratory only]ApprSFDDate5/18/2023ApprMGRDate6/2/2023ApprSFDDate5/18/2023AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDateGCW 06/05/2023JLC 6/5/2023