Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout184-184 I ?roject Well History File' e
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
J. ~ LJ._ _[ ~ _LJ_ Well History File Identifier
Organizing (done)
RESCAN
DIGITAL DATA
OVERSIZED (Scannable)
D Color items: D Diskettes, No. [3 Maps:
[] Grayscale items: r~ Other, No/Type []
[] Poor Quality Originals:
[] Other: -'~
',
NOTES.' ~' ~
BY:
BEVERLY BREN VI~T SHERYL MARIA LOWEEL
Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
Logs of various kinds
.
[] Other
DATE:
Project Proofing
BY: B~Y BREN VINCENT SHERYL MARIA LOWELL
Sca~ningPreparatio. '~/ x 30 = /¢~'-'~.,
BY: BEVERLY ~VINCENT SHERYL MARIA LOWELL
Production Scanning
Stage1 PAGE COUNT FROM SCANNED FILE:
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~
NO
Stage 2 /~~N STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES i NO
~[BEVE~, BRE, VINCENT SHERYL MARIA LOWELL "DATE: //./~F~/S,~
(SCANNING IS COMPLETE ATTHIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDiVIDUAl PAGE BASIS
RESCANNEDBY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE:
Isl
General' Notes or Comments about this file:
Quality Checked (done)
10/25/02Rev3NOTScanned.wpd
· .
Unocal North American/
Oil & Gas Division ~
Unocal Corporation
P.O. Box 190247
Anchorage, Alaska 99519-0247
Telephone (907) 276-7600
UNOCAL
March 29, 1994
Alaska Region
AOGCC
3001 Porcupine Drive
Anchorage, AK 99501
Dear Sir/Madam:
Submission of Form 10-407 &
Accompanying Paperwork
King Salmon K-8RD/K-26
API ~ 50-733-20097
As you are aware, Unocal recently abandoned the original
completion, in the K-SRD wellbore and then re-drilled and
recompleted the well. The re-drill was in a completely different
sub-surface location than the K-SRD location, and this is why
Unocal named the well K-26 as opposed to K-8RD2. The abandonment
and subsequent re-drill and re-completion was one operation. Unocal
regrets the delay in completing and submitting the appropriate
paperwork.
Please find the following documentation enclosed in triplicate:
1. Form 10-407 for the Abandonment Operation.
2. Form 10-407 for the Re-drill/ Re-completion Operation.
3. The directional profile of the well.
4. A Wellbore Schematic and accompanying description.
5. The Daily Summary of Operations.
If you have any questions or comments with regards to this well
please do not hesitate to contact the undersigned at 263-7800.
Gas Cons. commission
~chorage
Yours truly,
///t
~/ Jamle Ressler
Senior Drilling Engineer
STATE OF ALASKA
ALASK~ !L AND GAS CONSERVATION COMM~ ON
WELL COMPLETIO, i OR RECOMPLETION RE,,'ORT AND LOG
1. Status of Well Classification of Service Well
OIL ~1 GAS [-] SUSPENDED ~-] ABANDONEDE~ SERVICE ~-1
2. Name of Operator 7. Permit Number
UNION OIL COMPANY OF CALIFORNIA (UNOCAL) 84-184
3. Address 8. APl Number
P.O. BOX 196247 ANCHORAGE, AK 99519 50-733-20097-01
! , ·
4. Location of well at surface ~11~31~ 9. Unit or Lease Name
725'N & 133' W OF SE CORNERSEC.17, TgN, R13W, SM L~A~I~~ TRADING BAY UNIT
At Top Producing Interval 10. Well Number
4825' N & 133' W OF SE CORNER SEC. 17, T9N, R13W, SM ~, K-8RD
At Total Depth 11. Field and Pool
5091' N & 2199' W OF SE CORNER, SEC. 17, T9N, R13W, SM MCARTHUR RIVER/HEMLOCK
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
leO' KB, ADL 17594
12. Date Spudded11/25/93 13. Date m.D. Reached12/14/93 114' Date C°mp" Susp' °r Aband' [ 15' Water Depth' if °ffsh°re [16' N°' °f c°mpleti°nsl 2/14/93 100' Feet MSL 1
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 119. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost
14548/9829 408/408 lYES ~--~ NO [~I 267 feet MD N/A
22. Type Electric or Other Logs Run
NONE
23. CASING, LINER AND CEMENTING RECORD
CASING SIZE WT. PER FT. GRADE TOP I BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
24" 0' 350' DRIVEN DRIVEN NONE
13-3/8" 61 # J55 0' 2571' 17-1/2" 1750 SX NONE
9 - 5/8" 47# N80 0' 11376' 12-1/4" 750 SX NON E
7" 29# N80 10908 14546' 8-1/2" 620 SX NONE
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE I DEPTH SET (MD) I PACKER SET (MD)
ABANDONED ALL EXISTING PERFORATIONS 4-1/2" 10863'
3-1/2" 13604' 13560'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) I AMOUNT & KIND OF MATERIAL USED
SEE ATTACHED
27 PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
I
GAS LIFT
Date of Test Hours Tested PRODUCTION FOF OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD ---
Flow Tubing Casing Pressure CALCULATED OIL- BBL GAS-MCF WATER- BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
RECEIVED
APR -4 1994
A,Isska 0il & Gas Cons. Comrnissio
Anchorage
Form 10-407 Submit in duplicate
rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30.
GEOLOGIC MARKERS FORMA'FION TESTS
NAM~ ' ' '
.... .
Include intervaJ tested, pressure data. ail fluids recovered and gravity,
,.I"MEAS' DEPTH ~'RUE VER~. DEPTH GOR, and time of each phase.
· ,
31. LIST OF ATTACHMENTS .........
_WELLBORE SCHEMATIC. DIRECTIONAL SURVEY
· , ,., ,
· ' ..
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
'~'%ianed
..~- S'gned G. RUSSELL SCHMIDT Title .DRILLING MANAGER Date .. 02/02/94
,,,
,,.
.,
, ,
,
.
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate 'none'.
t.l. O s~ /L%cr~.P' '"G'
JATA:
.,~IY:
.,.NAME:
_OCATION:
CONTRACTOR:
SURVEY TYPE:
MAGNETIC INCl. JDECL '
DATE:
KICK OFF DEPTH
Unocal
K-26
King Salmon
PAA58
Gyro/MWD
0.00
94/01/23
440.00
SURVEYS ENTERED
80
TARGET DATA:
MEASURED DEPTH:
TRUE VERTICAL DEPTH:
INCLINATION: (Degrees)
BEARING (Degrees):
NORTH I SOUTH COORDINATE
EAST I WEST COORDINATE
VERTICAL SECTION:
TARGET RADIUS:
DOG LEG FACTOR (30 or 100):
10411.00
9153.00
17.50
335.74
4150.00
-1970.00
4593.84
125.00
100
SURV MEASURED INCL. HOLE DIRECTION COURSE TRUE VERT, VERTICAL TOTAL COORDINATES DOG LEG
# DEPTH: ANGLE AZIMUTH QUAD LENGTH DEPTH SECTION E(+) I W(-) N(+) I S(-)',
SEVERITY
TIE-IN 440.00 0.00 0.00 0 0.00 0 0.00 440.00 0.00 0.00 0.00 0.00
# 1 492 0.75 104 S 76.00 E 52.00 492.00 -0.211 0.330 -0.082 1.442
# 2 554 1.5' 195 S 15.00 W 62.00 553.99 -1.090 0.514 -0.964 2.724
# 3 613 2.5 223 S 43.00 W 59.00 612.95 -2.186 -0.564 -2.651 2.323
# 4 675 4.75 232 S 52.00 W 62.00 674.83 -3.318 -3.509 -5.221 3.732
# 5 765 6.25 249 S 69.00 W 90.00 764.42 -3.925 -11.020 -9.272 2.446
# 6 855 11 267 S 87.00 W 90.00 853.39 -0.530 -24.178 -11.478 6.014
# 7 981 12.7 292.6 N 67.40W 126.00 976.78 13.946 -48.988 -6.781 4.370
# 8 1077 13.7 304.8 N 55.20 W 96.00 1070.26 31.401 -68.070 3.765 3.100
# 9 1172 14.1 319.8 N 40.20 W 95.00 1162.51 52.183 -84.782 19.029 3.642
# 10 1287 15.4 330.4 N 29.60 W 115.00 1273.74 80.863 -101.370 43.010 2.623
# 11 1361 17.9 332.5 N 27.50 W 74.00 1344.63 102.003 -111.476 61.644 3.477
# 12 1459 21.7 330.1 N 29.90 W 98.00 1436.83 135.082 -127.468 90.720 3.968
# 13 1581 24.4 330~1 N 29.90 W 122.00 1549.08 182.614 -151.277 132.125 2.213
# 14 1711 27.2 330.8 N 29.20 W 130.00 1666.11 238.948 -179.163 181.349 2.167
# 15 1838 29.5 329;7 N 30.30 W 127.00 1777.87 298.969 -209.104 233.691 1.861
# 16 1964 30.9 328 N 32.00 W 128.00 1886.77 361.883 -241.902 287.916 1.319
# 17 2092 31 328~3 N 31.70 W 128.00 1996.54 427.135 -276.640 343.833 0.149
# 18 2312 31.3 329.4 N 30.60 W 220.00 2184.82 540.111 -335.501 441.226 0.304
,
# 19 2403 31~9 329.4 N 30.60 W 91.00 2262.33 587.502 -359.773 482.268 0.659
# 20 2495 32.2 329.7 N 30.30 W 92.00 2340.31 636.038 -384.514 524.355 0.374
# 21 2588 31.7 328.3 N 31.70 W 93.00 2419.22 684.909 -409.856 566.539 0.997
# 22 ' ' 2678 31.5 32815 N 31.50 W 90.00 2495.87 731.681 -434.567 606.705 0.254
# 23 2771 " 30.6 ' 330.4 N 29.60 W 93.00 2575.47 779.492 -459.023 648.125 1.342
# 24 2834 31.2 330.8 N 29.20 W 63.00 2629,47 811.809 -474.951 676.394 0.722
# 25 2884 31 330.1 N 29.90 W 50.00 2672.28 837.525 -487.688 698.861 0.859
# 26 3725 31.70 331.~0 ' N 28.20 W 841.00 3390.49 1273.489 -700.062 1081.341 0.138
# 27 3825 32.30 332.90 N 27.10 W 100.00 3475.29 1326.386 -724.649 1128.282 0.859
# 28 3941 32.80 332.90 N 27.10 W 116.00 3573.07 1388.721 .753.081 1183.842 0.431
,,
# 29 4065 33.40 333.20 N 26.80 W 124.00 3676.95 1456.363 -783.769 1244.205 0.504
....
# 30 4189 34.30 333.40 N 26.60 W 124.00 3779.93 1525.370 -814.802 1305.910 0.732
# 31 4434 32.30 333~20 N 26.80 W 245.00 3984.69 1659.752 -875.232 1426.075 0.818
# 32 4558 31.30 333.20 N 26.80 W 124.00 4090.08 1725.029 -904.693 1484.398 0.806
# 33 4682 30.70 334.30 N 25.70 W 124.00 4196.36 1788.853 -932.943 1541.671 0,682
# 34 ~ 4836 29.40 334.30 N 25.70 W 154.00 4329.66 1865.943 -966.384 1611o158 0.844
# 35 4991 ' 27~90 333.60 ' N 26.40 W 155.00 4465.68 1940.220 -999.010 1677.926 0.994
# 36 5148 27.60 333.20 N 26.80 W 157.00 4604.62 2013.260 -1031.740 1743.290 0.227
# 37 5272 27.80 332~90 N 27.10 I W 124.00 4714.41 2070.836 -1057.864 1794.670 0.199
#38 5427 28.C;0 332.50 N 27.50 !W 155.00 4851.40 2143.263 -1091.130 1859.120 0.180
# 39 5611 28.20 331.80 N 28.20 W 184.00 5013.71 2229.757 -1131.617 1935.745 0.216
# 40 ' 58'28 28.70 331.80 N 28.20 W 217.00 5204.50 2332.889 -1180.468 2026.851 0.230
#41 6139 28.50 3'31,50 N 28.50 W 311.00 5477.55 2481.382 -1251.159 2157.869 0,080
# 42 6447 29110 331.50 N 28,50 W 308.00 5747.45 2629.354 -1321.959 2288.266 0.195
# 43 6692 29.0~3 331.1'0 N 28.90 W 245.00 5961.63 2747.962 -1379.088 2392.616 0.092
# 44 6938 29.10 331.10 N 28.90 W 246.00 6176.68 2867.021 -1436.817 2497.191 0.041
# 45 7188 28.10 330.80 N 29.20 W 250.00 6396.17 2986.275 -1494.921 2601.809 0.404
# 46 7434 27.90 329.70 N 30.30 W 246.00 6613.38 3101.230 -1552.224 2702.074 0.233
# 47 7557 27.20 329.70 N 30.30 W 123.00 6722.43 3157.804 -1580.926 2751.193 0.569
# 48 76~1 I 26.40 329.40 N 30.60 W 124.00 6833.11 3213.386 -1609.258 2799.391 0.655
# 49 7805 26.10 329.00 N 31.00 W 124.00 6944.32 3267.873 -1637.339 2846.500 0.284
# 50 79:~2 25.80 328.7'0 N 31.30 W 127.00 7058.52 3323.045 -1666.086 2894.061 0.259
# 51 8028 25.80 328.30 N 31.70 W 96.00 7144.95 3364.494 -1687.917 2929.685 0.188
# 52 8121 26.90 334.30 N 25.70 W 93.00 7228.30 3405.602 -1707.679 2965.870 3.192
# 53 8216 28.60 339.60 N 20.40 W 95.00 7312.38 3449.783 -1724.929 3006.556 3.239
# 54 8312 29.30 345.20 N 14.80 W 96.00 7396.41 3495.889 -1738.941 3050.813 3.035
# 55 8408 30.10 345.20 N 14.80 W 96.00 7479.79 3542.806 -1751.091 3096.798 0.833
GENERAL DATA:
COMPANY:
WELLNAME:
LOCATION:
CONTRACTOR:
SURVEY TYPE:
Unocal
K-26
King Salmon
PAA 58
Gyro/MWD
MAGNETIC INCL/DECL:
DATE:
KICK OFF DEPTH
0.00
94/01/23
440.00
SURVEYS ENTERED
80
# 60
#61
# 62
# 63
# 64
# 65
# 66
# 67
# 68
# 69
# 70
# 71
# 72
# 73
# 74
# 75
# 76
# 77
# 78
# 7S
# 8C
8939 37.00 346.60
9038 36.70 345.50
9133 37.10 344.50
9228 37.60 344.10
932j 37.7~' 343.J0
9415 34.60 340.30
9510 32.40 340.30
9603 31.40 343.80
9698 32.50 349.80
9822 32.30 352.90
9880 32.90 352.90
9979 32.30 351.20
10074 31.00 350.80
10202 29.00
1O437 25.3O
349.40
343.80
10544 23.60 342.40
10608 21.70 339.60
10733 23.00 335.00
10829 23.70 331.10
10956 24.80 323.40
10984 25.10 322.50
13.4~
14.5~
15.5{
15.9~
16.9~
19.7~
19.7~
16.21
10.21
7.1{;
7.1C
8.8C
9.2(:
10.6~
16.2~
17.6~
20.4~
25.0~
28.91
36.61
37.5
TARGET DATA:
MEASURED DEPTH:
TRUE VERTICAL DEPTH:
INCLINATION: (Degrees)
BEARING (Degrees):
NORTH I SOUTH COORDINATE
EAST / WEST COORDINATE
VERTICAL SECTION:
TARGET RADIUS:
DOG LEG FACTOR (30 or 100):
90.00
99.00
95.00
95.00
93.00
94.00
95.00
93.00
95.00
124.00
58.00
99.00
95.00
128.00
235.00
107.00
64.00
125.00
96.00
223.00
28.00
7913.94
7993.16
8069.13
8144.65
8218.28
8294.18
8373.40
8452.36
8532.99
8637.69
8686.56
8769.96
8850.83
8961.68
9170.78
9268.19
9327.25
9442.87
9531.06
9646.86
9672.24
3842.093
3900.504
3956.799
4013.792
4070.065
4125.191
4177.456
4226.287
4275.563
4339.538
4369.395
4420,581
4468.670
4530.658
4635.785
4679,701
4704,234
4751.715
4789.724
4841.026
4852.544
10411.00
9153.00
17.50
335.74
4150.00
-1970.00
4593.84
125.00
100
-1820.519
-1834.829
-1849.594
-1865.191
-1881.230
-1898.588
-1916.262
-1931.422
-1942.850
.1952.845
-1956.707
-1964.077
-1971.872
-1982.851
-2007.352
-2020.208
-2028.207
-2046.585
-2063.847
-2092.913
-2100.030
3393.786
3451.406
3506.500
3561.983
3616.478
3669.122
3718.484
3765.213
3814.112
3879.779
3910.788
3963.610
4012.844
4075.888
4180.157
4222.532
4245.836
4289.634
4323.546
4366.718
4376.144
0.287
0.776
0.798
0.594
0.715
3.795
2.316
2.355
3.705
1.423
1.034
1.150
1.388
1.664
1.936
1.684
3.435
1.772
1.809
2.310
1.763
RECEIVED
APR -4 1994
Jore Schematic
· 194
lOOO
2000
3000
4000
5000
6OOO
7OOO
8000
9000
10000
11000
Perforations:
10148-10372' MD
10564-10814' MD
10
3 1/2" tbg 0'-300'
24" @ 350'
13 3/8" @ 2938'
7" TOL @ 9173'
9 5/8" ~ 9359'
3 1/2" tbg 0'-9998'
PBTD =10893'
TD=10984'
Shot with Sclum 2 1/8" thru tbg Enerjet 3 strip gun, 14 gm deep penetrating
charges, 12 spf (two runs ~ 6 spf), 90 degree phasing.
RECEIVED
APR -4 1994
J Pipe to 350'
,8" 61# K55 to 2938'
5/8" 53.5//P110 to 9359'
7" 29# LBO Liner 9173' to 10973'
i" Tubing (top down)
4 1/2" BTC tbg hanger
41/2" * 3 1/2"BTC '3 1/2" TDS crossover
3 1/2" 9.2# LBO TDS to 294'
1 Baker "TE-5" tubing retrievable" SSSV @ 300'
two x/o's 3 1/2" EUE * 3 1/2" TDS
67 jts 3 1/2" 9.2# LBO TDS
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
2 Camco SP GLM @ 2380' MD ( 2240' TVD)
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
58 jts 3 1/2" 9.2# LBO TDS
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
3 Camco SP GLM @ 4167' MD (3760 ' TVD)
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
37 jts 3 1/2" 9.2//LBO TDS
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
4 Camco SP GLM @ 5334' MD ( 4750' TVD)
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
32 jts 3 1/2" 9.2# LBO TDS
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
5 Camco SP GLM @ 6331' MD ( 5643' TVD)
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
16 jts 3 1/2" 9.2# LBO TDS
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
6 Camco SP GLM @ 6854' MD (6103 ' TVD)
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
15 jts 3 1/2" 9.2# LBO TDS
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
7 Camco SP GLM @ 7337' MD ( 6529' TVD)
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
17 jts 3 1/2" 9.2# LBO TDS
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
8 Camco SP GLM @ 7880' MD ( 7009' TVD)
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
15 jts 3 1/2" 9.2//LBO TDS
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
9 Camco SP GLM @ 8361' MD ( 7446' TVD)
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
17 jts 3 1/2" 9.2# LB0 TDS
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
10 Camco SP GLM @ 8905' MD ( 7890' TVD)
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
18 jts 3 1/2" 9.2//LBO TDS
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
11 Camco SP GLM @ 9481' MD ( 8357' TVD)
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
12 jts 3 1/2" 9.2# L80 TDS
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
12 Camco SP GLM @ 9869' MD ( 8695' TVD)
two x/o's 3 1/2" EUE * 3 1/2" BTC and 3 1/2" BTC * 3 1/2" TDS
16'* 3 1/2" TDS pup jts (2)
XA sleeve with x/os to TDS
1 jt 3 1/2" TDS tbg
· * Baker Anchor 9900' MD
· * Baker "SAB-3" Pecker
· * Baker Millout Extension 9940' MD
· * two x/o's 3 1/2" LTC * 3 1/2" BTC and 3 1/ 9941' MD
· * tbg pup
· * lit3 1/2"TDStbg
· * Otis XN nipple
· * Tbg pup
· * n' ker ~h,oar n~,t e~h W/vn
RECEIVED
APR - 4 1994
Gas Cons. C0mmiss
Anchorage
2.81" profile
2.81" profile/2.68" NO GO
KING SALMON PLATFORM
WELL K26
DAY 0 (11/24/93)
ACCEPTED RIG @ 00:01 HRS 11/24/93.
DAY 1-5 (11/24-28/93)
COMMENCE OPERATIONS ON AT 00:01 HRS. ON 11/24/93. KILL WELL CUT
TUBING AT 13492'. N/D TREE, N/U BOP. TEST SAME HAD PROBLEMS WITH
BLIND RAMS REPAIR AND TEST. TESTED OK. POOH AND L/D TUBING
STRING. SET EZSV ON WL AT 13500'. RIH W/DP STINGER TESTED CASING
TO 1500 PSI. CEMENT SQUEEZE AND ABANDON PERFORATIONS WITH 35
BBLS OF CEMENT TO 3200 PSI. LAY 6 BBL PLUG ON TOP OF EZSV. POOH.
DAY 6 (11/29/93)
PUMPED 12 BBL BALANCED CEMENT PLUG F/11000' TO 10800'.
PERFORATED 2600-2602 4 SPF (SQZ PERFS). SET EZSV @ 2553'. PUMPED
30 BBL CMT INTO SQZ PERFS. PLACED 2 BBL CMT ON TOP OF EZSV. LAY
DOWN DP.
DAY 7 (11/30/93)
LAYED DOWN DRILL PIPE. CUT 9-5/8" CSG @ 1000'. SPEARED 9-5/8" &
POOH.
DAY 8 (12/01/93)
EQUALIZED CEMENT PLUG F/1100'-900' ACROSS 9-5/8" CSG STUB AT 1000'.
POOH. WOC. RAN CBL IN 13-3/8" CSG F/780'-SURFACE; INDICATES
PROBABLE TOC AT 400'. NIPPLED DOWN 13-5/8" BOPE.
DAY 9 (12/02/93)
NIPPLED UP 20" DIVERTER.
RECEIVED
APR -4 1994
A.laska 0il & Gas Cons. Commission
Anchorage
DAY 10-12 (12/03-05/93)
CUT CASING AT 375'. POOH. RIH W/SPEAR ATTEMPT TO JAR FREE NO
SUCCESS. CUT CASING AT 175'. POOH. RIH W/SPEAR ATTEMPT TO JAR
FREE NO SUCCESS. CUT AT 65'. RIH W/SPEAR LATCH AND PULL FREE. RIH
W/STINGER. TAG CEMENT AT 928' DISPLACE HOLE TO 8.7 PPG MUD. RIH
W/13-3/8" METAL MUNCHER PILOT MILL. MILL 13-3/8" CASING FROM 67' TO
160', LOST 17,000 WEIGHT. POOH. LOST D.C. FISH FROM BOTTOM OF MILL
IN HOLE. CLEAN OUT METAL CUTTINGS IN HOLE. RIH RETRIEVE FISH POOH
L/A SAME.
DAY 13 (12/06/93)
SPEARED CASING @ 160'. PULLED & RECOVERED 17' OF 13-3/8" CSG.
MILLED CUT & CSG F/160'-219'. POOH AND DRESSED MILL. RIH MILLED
F/219'-240'.
DAY 14 (12/07/93)
MILLED 13-3/8" CASING F/234'-307'.
DAY 15 (12/08/93)
MILLED 13-3/8" CASING F/307'-363'. POOH W/MILLING ASSEMBLY. RAN
SPEAR. SPEARED 14' CSG. POOH. RIH W/MILL REAMED CMT F/377'-385'.
DAY 16 (12/09/93)
MILLED 13-3/8" CASING F/385'-407'. POOH W/MILLING ASSEMBLY.
CHANGED MILLS. AND STABILIZATION. MILLED F/407'-442'.
DAY 17-19 (12/10-12/93)
MILLED 13-3/8" CASING F/442'-550'. POOH & LAYED DOWN MILLING
ASSEMBLY. MADED UP & RIH W/17.5" BIT (DRILLING ASSEMBLY). REAMED
CMT F/42'-550'. POOH. RI TO PLACE GEL PLUG. COULD NOT ENTER 13-3/8"
CSG STUB @ 550'. MIX & PUMPED 58 BBL CMT KO PLUG. CIP @ 6:12 HRS
12-12-93. RI. TAGGED CMT @ 402'. (19:30 HRS 12-12-93). CEMENT STILL
GREEN. CLEANED MUD PITS.
DAY 20 (12/13/93)
WOC. RIH W/MUD MOTOR.
W/MOTOR TO 703'.
KICKED OFF CEMENT PLUG @ 440'.
DRILLED
RECEIVED
APR -4 1994
Alaska Oil & Gas Cons. Commission
Anchorage
DAY 21 (12/14/93)
DRILLED F/703'-1245'.
DAY 22 (12/15/93)
DRILLED F/1245'-1708'. SHORT TRIPPED. DRILLED F/1708'-1730'.
DAY 23 (12/16/93)
DRILLED F/1708'-2160'. PLATFORM GENERATOR DOWN. TRIPPED OUT TO
350'. CIRCULATED & WAITED ON GENERATOR REPAIR.
DAY 24-26 (12/17-19/93)
WAITED ON GENERATOR REPAIRS. POWER RESTORED 05:00 HRS. 12/18/93.
RIH. CIRCULATED & CONDITIONED MUD. DIRECTIONALLY DRILLED TO
CASING POINT. CIRCULATED & CONDITIONED MUD & HOLE PRIOR TO
RUNNING CASING. POOH TO RUN CASING.
DAY 27 (12/20/93)
DRILLED TO SFC TD (2941'), RAN & CEMENTED 13-3/8" CASING TO 2935'.
WOC. NIPPLED DOWN DIVERTER.
DAY 28 (12/21/93)
RIGGED DOWN DIVERTER. CUT CASING. WELDED BOWL ON TO 13-3/8"
CASING. NIPPLED UP & TESTED BOP'S, TESTED OK.
DAY 29-33 (12/22-26/93)
DRILLED & SURVEYED F/2,705' - 5,646'.
DAY 34 (12/27/93)
DRILLED & SURVEYED F/5646'-6574'.
DAY 35 (12/28/93)
DRILLED & SURVEYED F/6574'-6727'. SHORT TRIPPED.
7223'.
DAY 36 (12/29/93)
DRILLED & SURVEYED F/7223'-7662'.
DRILLED F/6727'-
RECEIVED
APR -4 1994
A.laska. 0il & Gas Cons. Commission
Anchorage
DAY 37-39 (12/30-01-02/94)
DRILLED & SURVEYED F/7662'-8063'. CBU. TRIPPED FOR BIT. TESTED
BOP'S; ALL OK. MADE UP MOTOR BHA. RIH. REAMED 7983'-8063'. DRILLED
F/8063'-8753'. TRIPPED FOR BHA. CHANGED BHA TO ROTARY ASSEMBLY.
RIH.
DAY 40 (01/03/94)
REAMED 8600'-8753'. DRILLED & SURVEYED TO 9085'.
DAY 41 (01/04/94)
DRILLED & SURVEYED TO INTERMEDIATE CASING POINT (9366'). CBU.
POOH. LAYED DOWN MWD. RIH.
DAY 42 (01/05/94)
RIH. REAMED9184'-9366'. CBU. PERFORMED SHORT TRIP. WORKED TIGHT
HOLE AT 9190'. RAN BACK TO BOTTOM AND INCREASED MUD WEIGHT TO
9.7 PPG. PERFORMED 20 STAND SHORT TRIP. CBU. POH TO LOG.
DAY 43 (01/06/94)
POOH TO LOG. R/U & RAN E-LOG #1 QUAD-COMBO. LOG #2 FMI NO
PROBLEMS. RIH FOR WIPER TRIP.
DAY 44-46 (01/07-09/94)
CIRCULATED, CONDITION MUD POOH. RUN 9-5/8" CASING TO 9359'.
CIRCULATE & CONDITION MUD. RECIPROCATE CASING AND CEMENT
CASING. BUMPED PLUG W/500 PSI. CIP 20:30 ON 1/8/94. SET PACK OFF
BUSHING. TEST BOP'S, OK. P/U BHA AND RIH.
DAY 47 (01/10/94)
RIH. TEST CASING TO 3000 PSI. CLEAN CASING. DRILLED 8-1/2" HOLE TO
9376'. PERFORM F.I.T. TO 15.7 PPG EMW. DIRECTION DRILLED TO 9599'.
DAY 48 (01/11/94)
DIRECTIONALLY DRILL 8-1/2" HOLE 9878' PERFORM SHORT TRIP.
GOOD SHAPE. DRILL 9878' TO 9909'.
HOLE IN
RECEIVED
APR -4 1994
0il & Gas Cons. Commissi¢
Anchorage
DAY 49 (01/12/94)
DIRECTIONALLY DRILL 8-1/2" HOLE TO 9940'. POOH FOR BHA CHANGE. RIH
W/8-1/2" BIT ON PENDULUM ASSY. DRILLED FROM 9940' TO 10039'.
DAY 50 (01/14/94)
DIRECTIONALLY DRILL 8-1/2" HOLE FROM 10,039' TO 10,052'. GOT STUCK AT
10,052' WHILE PICKING UP. JARRED FREE. DRILLED TO 10,164'.
DAY 51-53 (01/14-16/94)
DIRECTIONALLY DRILL TO 10,287'. SHORT TRIPPED. HOLE IN GOOD
CONDITION. DRILLED TO 10,457. TRIPPED FOR BIT. HOLE GOOD ON TRIP.
DIRECTIONALLY DRILLED AHEAD TO 10,629'. SHORT TRIPPED. CBU PRIOR
TO POOH TO LOG.
DAY 54 (01/17/94)
LOGGED W/SCHLUMBERGER. RUN #1 QUAD COMBO. RUN #2 DIPMETER.
RIGGED OUT LOGGERS. WAIT ON PROCESSING OF LOG DATA.
DAY 55 (01/18/94)
WAITED ON ORDERS. RECEIVED ORDERS TO RESUME DRILLING. RIH.
DRILLED F/10629'-10738'.
DAY 56 (01/19/94)
DRILLED F/10738'-10897'. CBU. SHORT TRIPPED. DRILLED F/10897'-10974'.
DAY 57 (01/20/94)
DRILLED F/10974'-10984'. CBU. TRIP FOR BIT. POH-ALL THREE CONES
FROM BIT #10 LEFT IN HOLE. RIH W/TOOTH BIT. REAMED 50' TO BOTI'OM
WORK ON JUNK. POOH TO PICKUP REVERSE CIRCULATING JUNK BASKET.
ALL THREE CONES & SHANKS FROM BIT #11 LEFT IN HOLE.
RECEIVED
APR - 4 1994
Oil & Gas Cons. Commission
Anchorage
DAY 58-60 (01/21-23/94)
RIH W/REVERSE CIRCULATING JUNK BASKET, WORKED JUNK BASKET.
POOH. NO JUNK RECOVERED. DECISION MADE THAT 10984' WOULD BE TD.
RIGGED UP LOGGERS. LOGGED RUN #1, OK. RUN #2-HUNG UP WHILE
POOH @ 9910'. RIH FOR WIPER TRIP. CIRCULATED & CONDITIONED HOLE.
POOH 30 STANDS. WELL STARTED TO FLOW. RAN BACK TO BO'I-I'OM.
CIRCULATED. POOH. RAN LOGGING RUN #3. POOH. RIG OUT LOGGERS.
RIH TO CONDITION HOLE PRIOR TO RUNNING 7" LINER. SURVEYED BOTTOM
1000' OF HOLE. CIRCULATED & CONDITIONED ON BOTTOM. POOH. LAYED
DOWN HWDP & BHA. RIGGED UP TO RUN 7" LINER. MADE UP & RAN 7"
LINER.
DAY 61 (01/24/94)
RIH W/7" LINER. SPACE OUT LINER. LINER TOP PACKER @ 9173' MD. SHOE
@ 10973' MD. RIGGED UP CEMENTERS. PUMPED 50 BBL DUAL SPACER,
FOLLOWED BY 10 BBL WATER, FOLLOWED BY 130 BBL TLW CEMENT.
BUMPED PLUG. SET LINER, AND LINER TOP PACKER. BACKED OFF
RUNNING TOOL. PULLED 5 STANDS. REVERSE CIRCULATED. POOH. MADE
UP 8-1/2" BIT & 9-5/8" CSG SCRAPER. RIH.
DAY 62 (01/25/94)
RIH W/8.'5" BIT. TAGGED CEMENT @ 8875'. P TESTED CSG TO 1500 PSI FOR
10 MIN. DRILLED OUT CEMENT TO TOL @ 9173'. TEST CSG TO 1500 PSI FOR
10 MIN. POOH.
DAY 63 (01/26/94)
MADE UP 6" BIT, 7" SCRAPER ON 3-1/2" DP, 9-5/8" CASING SCRAPER. RIH TO
9180'. TAGGED CMT. CHASED CEMENT DOWN THE HOLE. DRILLED
CEMENT F/10800' TO FLOAT COLLAR @ 10893'. CIRCULATED HOLE OVER TO
COMPLETION FLUID.
DAY 64 (01/27/94)
POOH. LAYING DOWN DRILL PIPE. RAN CBL/VDL. RIGGED UP TO RUN TBG.
RECEIVED
APR -4 1994
utl& 6as Cons. CO~iTliSS
A~chorage
DAY' 65-67 (01/28-30/94)
RAN COMPLETION STRING, INCLUDING GLM'S & SSSV & HANGER. SPACE
OUT & LAND COMPLETION. PACKER @ 9946'. TBG TAIL @ 9998.7'. NIPPLE
DOWN BOP'S. NU WELLHEAD. P TEST TREE TO 5000 PSI, OK. RIGGED UP
WIRELINE & RAN 1.75" SWEDGE TO 10890'. RIGGING DOWN RIG. RIGGED UP
TO PERFORATE W/STRIP GUNS. UNABLE TO GET STRIP GUNS BELOW
GLM'S.
DAY 68 (01/31/94)
DEMOBLIZING RIG. ADDED SINKER BARS TO STRIP GUNS. RIH TO
PERFORATE. REDUCE HYDROSTATIC TO PERF 1000 PSI UNDERBALANCED.
PERFORATED 10780'-10814' W/THRU-TBG 2-1/8" ENERJET 3, 12 SPF, 14 GM
DEEP PENETRATING CHARGES (2 RUNS).
DAY 69 (02/01/94)
PERFORATED 10746'-10780' (2 RUNS). PERFORATED 10712'-10746' (1 RUN).
POOH. RIH W/GUN #5. STUCK IN GLM @ 6317'. WORK GUN UP TO 114'.
DAY 70 (02/02/94)
FISHED FOR PERFORATING GUN @ 114'. RECOVERED 40' OF 70' OF
WIRELINE. MOVED FISHDOWN TO 925'.
DAY 71 (02/03/94)
WORKED ON FISH. APPEAR TO BE HUNG UP IN SSSV @ 300'. WILL SWITCH
OVER TO WIRELINE FROM SLICKLINE & CONTINUE FISHING.
DAY 72 (02/04/94)
RECOVERED FISH W/SLICKLINE. RAN GAUGE RING TO TBG TAIL, OK.
RESUME PERFORATING OPERATIONS. FINAL FORMAL REPORT.
DAY 73-75 (02/05-07/94)
RESUMED THROUGH TUBING PERFORATION OPERATIONS. PERFORATED
10678'-10712', 10644'-10678', 10610'-10644', 10576'-10610', 10564'-10576',
10338'-10372', 10364'-10338', 10270'-10304', 10236'-10253', 10202'-10236',
10168'-10202', 10148'-10168', 10253'-10270' @ WITH 2-1/8" ENERJET 3, 6 SPF,
14 GM DEEP PENETRATING CHARGES. PERFORATED W/SEPARATE GUN
RUNS. PLACED WELL ON PRODUCTION. WELL BLOWING AROUND DRY.
SUSPECT GAS LIFT PROBLEM. ~ E £ E IV E D
APR -4 1994
A~aska Oil & Gas Cons. Commission
Anchorage
DAY 76-77 (02/08-09/94)
RAN GAS LIFT SURVEY. LOST PRESSURE GAUGES IN HOLE. ESTIMATED TOP
OF FISH @ 10790' __+.
DAY 78 (02/10/94)
FLOWED WELL. SHUT WELL IN & RIGGED UP TO RUN BHP SURVEY.
DAY 79-80 (02/11/94-02/12/94) WORK ON GAS LIFT VALVES. ALL APEAR TO
BE FINE. SHUT DOWN OPERATIONS. FINAL REPORT.
PRESENTLY EVAULATING WELL & BHP SURVEY DATA TO DETERMINE
FUTURE WORKOVER POSSIBILITIES ON THE WELL.
NOTE: BOP TEST PRESSURES 250 PSI LOW, 5000 PSI HIGH, ANNULUR 3500 PSI
RECEIVED
APR -4 1994
A.~ska 0il & Gas Cons. Commission
Anchorage
Unocal North American,~~
Oil & Gas Division ~
Unocal Corporation
P.O. Box 190247
Anchorage, Alaska 99519-0247
Telephone (907) 276-7600
UNOC:AL )
October 19, 1993
Alaska Region
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage Alaska
99501-3192
Attention: Mr. David Johnston, Commissioner
Dear Sir:
Re: Kino Salmon Pl~tf0rm
Well K-SRD/K-20
Unocal Energy Resources Division hereby makes application to plug and abandon the existing
well (K-8RD) back to 650' MD. This depth (650' MD) is the kick off point for the new well (K-26).
In other words, K-26 will utilize the top 650 feet of the existing K-8RD wellbore and then deviate from
there on a new well path.
We are submitting our application in two parts. The first part is the Sundry application. This will
cover the plugging and abandonment operations. The second part is the Permit to Drill. The
permit covers the drilling portion of the proposed operations. We are proposing to conduct
the two operations consecutively.
In support of the Sundry application please find the following enclosed;
a) completed "Application For Sundry Approvals"
b) an outline of our proposed Abandonment program
c) well schematic of the present completion status
d) diagram of our proposed BOPE configuration
e) diagram of our proposed Diverter configuration
0 CT 0
A~ask~ 0il & Gas Cons,
Anchorage
In support of the Permit to Drill application please find the following enclosed;
a) completed "Permit To Drill'
b) cheque for $100.00 (application fee)
c) an outline of our proposed Drilling program
d) Property plat
e) PIct of the Projected Days vs Depth for this project
f) diagram of our proposed BOPE configuration
g) diagram of our proposed Diverter configuration
h) schematic of the choke manifold
i) copy of the proposed directional plan
j) calculation of Anticipated Pressures
k) copy of the mud program that was filed with EPA
I) schematic of the King Salmon mud system
m) inventory of the King Salmon mud system and related equipment
All of the aforementioned documentation is submitted in triplicate, with the exception of the
full well path view of the proximity plot. Due to its size we only included only one copy.
Aisc enclosed is a letter requesting AOGCC approval to drill the well within 500' of a Section line.
If you have any questions or comments with regards to our application(s) please do not hesitate
to call Jamie Ressler, at 263-7800.
RE'C'E!VE£ '
00T 2. 0 t99,
,~ask.~ ~il & ~a.s Cons.
Anchorage
Very truly yours,
G. Russell Scmidt
Drilling Manager
' '" ' ' ~ STATE OF ALASKA ~...
' ' ALA,~[ OIL AND GAS CONSERVATION COMM~ ON
APPLICATION FOR SUNDRY APPROVALS
1. Type of request: Abandon X_ Suspend __ Opera§om shutdown __ Re-enter suspended well__
Alter casing Repair well Plugging Time extension Stimulate
Change approved program Pull tubing Variance Perforate Other
2. Name of Operator ~ 15. ~ype of Well: ~ 6.~'atum eleva-~n (DF or
I D,,v,~p,,~t X
UNION OIL COMPANY OF CALIFORNIA (UNOCAL) I Explorato~/--- 100'
3. Address I Stzatigraphic -- 7. Unit or Property name
P.O. BOX 196247 ANCHORAGE, AK 99519 I se~ce ~ Trading Bay Unit
4. Location of well at surface
725' N & 133' W of SE corner, Sec. 17m T9N, R13W, SM
At top of productive interval
4875' N & 2103 WofSE Comer, Sec 17, T9N, R13W, SM
At effective depth
At total depth
5091' N & 2199' W of SE corner Sec. 17, T9N, R13W, SM
8. Well number
K-8RD
9. Permit number
84-184
10. APl number
50-733 -20097-01
11. Field/Pool
McArthur River/Hemlock
12. Present well condition summary
Total depth: measured
true vertical
14548' feet Plugs (measured) None
9829' feet
Effective depth: measured 14524' feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True vertical depth
Structural 350' 24" D riven 350' 350'
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
2571' 13-3/8" 1750 sx 2571' 1650'
11376' 9-5/8" 750 sx 11376' 7689'
3640' 7" 620 sx 10908'- 14548' 7465'-9827'
measured 13734'-13786', 13870'-13890', 14115'-14195', 14320'-14353' RECeiVED
true vertical 9251 '-9281 ', 9346'-9360', 9518'-9575', 9664'-9688'
OCT 2 0 995
Tubing (size, grade, and measured depth) 4-1/'Z', 12.6#, N80, BTC to 10863' MD .~lasJ(c3. 0jJ & Gas Cons. Cornmissi
3-1/2", 9.2#, N80, BTC 10864'-13604' MD
Packers and SSSV (type and measured depth) Baker 'FB-I' packer @ 14295'. Bker 'FHL' packer @ 1351~li]¢h0rage
Camco TROP -1 SSSV ~ 267'.
13. Attachments Description summary of proposal x_ Detailed operations program__ BOP sketch x_
14. Estimated date for commencing operation J15. Status of well classification as:
November 5, 1993
16. If proposal was verbally approved Oil x _ Gas __ Suspended __
Name of approver Date approved Service
17. I herel~ce~e~and correct to the best of my knowledge.
Signed G. Russell Schmidt Title Drilling Manager Date
FOR COMMISSION USE ONLY
10/19/93
Conditions of approval: Notify Commission so representaUve may witness
Plug Integrity ~ BOP Test ~ Location clearance
Mechanical Integrity Testm Subsequent form required 10- _l./..._~7
Approved by the order of the Commission
Form 10-403 Rev 06/15/88
Original Signed By
David W. Johnston
IApproval N o~;:,,,~,._,~.oC~~
..'.,'.z~ :~ Copy
"" '~-~ ~ o
Commissioner'---'-D'ate !~.//'~. ~'"/~ ~
SUBMIT IN TRIPLICATE
K26 Well Plan
Revised 1 O- 18-93
A. Pertinent Info.
Tubing: 3.5", 9.2# N80 BTC Landed in packer @ 13560'
Note: Bottom gas lift mandrel @ 13308'
Packer(s) #1 Baker FHL w/millout extension @ 13560'
#2 Baker FB-1 w/tubing tail @ 14295'
Tubing Restrictions: 06/92 2.7" gauge ring to 14273' Previous wireline tags were all at similar depths.
07/93 Gyro well to 2000' with 2.5" OD tool. No problems.
Bottomhole Pressure: 4280 psig (.43 psi/ft 8.3ppg)
H2S: present 1000-1400 ppm. New zone in Huevos Block is expected to be
H2S free.
Well's present status: Producing 350 bpd gross fluid.
KOP: The optimal KOP has been determined to be 650'. If we kicked off any
lower, ie below the 13 3/8" shoe @ 2571', we would have to drill a wellpath
with some unacceptably high doglegs. If we kicked off higher than 650 feet we
ran the risk of interference with existing wells.
Casing Program- Background & Proposal
Surface Casing:
The King Salmon platform has been set in an area that is structurally North
west of the Grayling gas sands. This fact coupled with research of the
historical surface casing programs of the King Salmon wells and a review of
existing top hole mudlogs is the basis for our casing program. The King Salmon
platform presently has 23 wells drilled from it. All of these wells had similar
casing programs in that none of them had an intermediate casing string
between the Drive Pipe (driven, not cemented to 350'+) and the surface
casing. Surface casing depths ranged from 2384' to 5493'. Surface hole was
drilled with mud weights ranging from 9.2-9.9 ppg. None of the wells reported
any kicks or background gas to speak of, however the reports were not very
detailed on any aspect of the drilling operations. I also reviewed the only two
mud logs (K-1 & K-2) that were run in the top hole sections. Both of these had
very Iow mud gas levels, above 3000'. Background gas was 5 units, with highs
of 80-100 units upon penetration of several of the coal seams. Based on this
information we are proposing to set 13 3/8" surface casing at 2925' +. This
appears to be competent, conglomerate rock at this depth.
R E C E!V !;
Oil & Gas bu,,,~
Anchorage
Casing Program- Background & Proposal (cont.)
Production Casing:
9 5/8" production casing is proposed, from surface to TD. However we have
seen numerous hole problems in the past that have caused casing to be run
earlier than expected. I am proposing that we drill 12 1/4" hole to the top of
the "F" zone (8600' MD) and evaluate our hole condition, number of trips, days
from drill out, etc. This evaluation will determine whether we continue on with
12 1/4" hole, or stop and set 9 5/8" intermediate casing. If we did set the
9 5/8" intermediate casing we would drill out with 8 1/2" bits and set a 7"
liner. The plan is to drill 12 1/4" hole to TD, and set 9 5/8" casing at TD.
The 7" liner option is merely a contingency.
B. Prior to rigging up over the well.
1. Rig up slickliners. Run 2.5" gauge ring to 13560'. POOH.
This will ensure that we can run a jet cutter (OD = 2 7/16").
2. Rig up and attempt to pump down backside of 9 5/8" casing.
3. Attempt to feel for cement top in 24" * 13 3/8" annulus. (200% excess cement
was pumped, but no mention of returns)
4. Prepare to kill well with FIW. FIW density is 8.5 ppg.
5. Kill well by bullheading kill fluid down tubing. Pump 150 bbls of kill fluid
6. Monitor well for 30 minutes to ensure dead.
7. Run jet cutters and cut tubing as deep as possible. If can get all the way to tubing
tail then cut in second joint above packer @ 13,560'.
8. Circulate well over to FIW.
9. Set tubing plug. Set BPV.
R E ¢ E," !?,
C. Abandonment Procedure.
1. Nipple down tree. Nipple up 13 5/8" BOP's. Test BOP's
2. Pull BPV and tubing plug.
3. Monitor well. Fill hole with FIW.
4. Pull tubing as per Laura Hammond's NORM criteria. Lay down tubing as you come
out.
5. Send tubing to APl for inspection. Mark any joints as junk as you can
determine.
6. Run and set cement retainer on E line. Set EZSV at 13550' (right above packer)
7. RIH with drill pipe. Pressure test EZSV to 1500 psi. Sting in to EZSV. Pump
cement. Pull out of stinger and reverse circulate drill pipe clean. Hole volume
between packer at 13550' and PBTD (14524') is 37 bbl. +
8. Spot cement plug on top of EZSV. Plug should cover 75 lineal feet of casing. WOC.
9. Pull up, reverse circulate drill string clean.
10. Pull up to 11000' (100 feet below liner top) Spot balanced cement plug from
11000' to 10800'.
11. Reverse circulate drill pipe clean. WOC.
12. Rig up to perforate 9 5/8" and 13 3/8" casing (circulating charges). Perforate at
2600' + (first shale below shoe @ 2571').
13. Rig up and attempt to establish a feed rate.
14. Rig up cementers to conduct block squeeze. Conduct squeeze.
15. Reverse circulate excess cement from drill pipe. WOC.
16. POOH. Pick up casing cutters.
17. Run in and cut 9 5/8" casing. Cut casing at 1000'-i-. Spear into and pull casing.
(top of cement is calculated to be at 8600').
18. Pull and lay down approximately 1000' of 9 5/8" casing.
19. Mix and pump balanced cement plug. Place cement from 1100' (100' below
casing stub) 900'(100' above casing stub). Cement volume = 25 bbl +. WOC.
20. Reverse circulate excess cement from drill pipe.
21. Nipple down 13 5/8" BOP's. Nipple up 20" Diverter System. Strip external valves
and flanges from Unihead. Test BOP's.
22. Make up landing joint and screw into top of Unihead. Cut 13 3/8" casing to
facilitate removal of Unihead. Remove Unihead.
23. Run CBL to evaluate cement behind 13 3/8" casing. This will help determine if we
mill or cut and pull the 13 3/8" casing.
24. The casing to be removed is 13 3/8" 61# J55 casing. .
25. Cut and pull or mill 13 3/8" casing from top to 800' +.
26. Spot cement plug from 900' to 400'. Approximately 80 bbl. WOC.
27. Pick up 17.5" bit and rotary assembly. Tag cement.
28. Polish plug to 650'.
OCT
,A~aska~ Oil & Gas Con~,
K26 Well Plan
D. Drilling Procedure
Notes: A. 20" Diverter system, previously installed and used in Abandonment portion
of program.
B. See proposed Directional Well Path for details.
1. RIH to 650' with 17.5" Angle build assembly. Directionally drill to 2940' +.
2. Circulate and condition prior to running 13 3/8" casing.
3. POOH lay down 17.5" drilling assembly.
4. Prepare to and run 13 3/8" casing.
5. Circulate and condition hole prior to cementing.
6. Rig up Halliburton. Mix and pump cement as per detailed Halliburton program.
WOC.
7. Nipple down 20" Diverter. Nipple up 13 5/8" BOP's. P. test and function test
BOP's, choke manifold and all related equipment.
8. Make up 12 1/4" drilling assembly.
9. RIH. Test pipe rams. Continue in hole. Tag float collar @ 2890' +. Drill out float,
cement, shoe and 5 to 10 feet of new formation.
10. Conduct leak off test.
11. Directionally drill to base of E zone (9700 ' MD/8500' TVD). This is the potential
early casing point. Evaluate hole conditions, number of trips, days from drill out,
anticipated days to completion etc.
12, Based on results of Step//11, log, run and cement casing, change and test BOP's
appropriately.
13. Directionally drill to 11260' (TD).
14. Circulate and condition hole prior to logging.
15. Log as per detailed logging program. Steps 16 and 17 may not be necessary. If
casing was set in Step 12 we may run MWD/LWD over the bottom portion of
the hole. This would eliminate the need for open hole logs over this section.
16. RIH and condition prior to running casing.
17. Rig up and run 9.5/8" casing if not previously run in Step 12 or 7" liner if casing
was'run in Step 12.
18. Circulate and condition hole prior to cementing.
19. Rig up Halliburton. Mix and pump cement as per detailed Halliburton program.
20. Nipple down BOP's. Nipple up wellhead,
End of Drilling Operations,
RECEIVED
0 CT 2 0 199;
Alaska 0il & Gas Cons.
Anchorage
K26 Well Plan
E. Completion Plan
1. Run Gyro and CBL/CET
2. Make up perforating guns (Number of feet, and gun type to be determined) and
permanent packer (FB-1) on 3.5" tubing.
3. RIH.
4. Space out. Nipple down BOP's. Button up wellhead.
5. Reduce hydrostatic to attain 700 psi underbalance prior to perforating.
6. Perforate.
7. Monitor well. Turn over to production
AIaska Oil & Gas Cons~
ARCO 'Alaska, Inc.
Well ~ API~: ~733-20097-01
Spud Date: 11-9-84 Completion Date: 5-4-85
Original RKB: 100' MSL Hanger Type: 4-1/2" FMC
Top of Hemlock: 13720" Maximum Hole Angle: 57°
Annulus Fluid: Sea water Last Revised: 06-23-92
All Depths are RKB MD to Top of Equipment.
("--~ding Bay Unit - King Salmon, Qlatform
Well Type: Producer
New i~1 Workover I"1
RKB to Hanger: 85.00"
Angle at Perforations: 4,5°
Reason: GR data update
Jewelry
1 26T
2 1 _08~__~'
3 13545'
4 13560'
5 13593"
6 1_3603_2
7 13603'
8 14295'
9 14808'
10 1~'
Camco TRDP1-A SSSV nipple: ID = 3.813'
4-1/2' to 3-1/2' cross-over
Baker PBR: ID = 3.0[X7 Length = 14.20'
Baker "FHL" packer
Camco "DS* nipple: ID = 2.812'
Baker 3-1/2" WL re-entry guide: ID = 3.000"
3-1/2' tubing tall
Baker "FB-I* Isolation packer
Baker 3-1/2" WL re-entn/guide
3-1/2' Isolation packer tubing tail
8
9
10
Casing and Tubing
13-3/8' 61~ J-55 BTC
9-5/8' 47~ N-80 BTC
7" 29~ N-80 BTC
4-1/2' 12.6~ N-83 BTC
3-1/2' 9.2~ N-80 BTC
Gus Uti Info~
2780' 1 242.b' Camco 4-1/2' MMG
5678' 2 4310' Camco 4-1/2' MMG
8153' 3 5780' Camco 4-1/2' MMG
10043' 4 6g05' Camco 4-1/2' MMG
10854' 5 7394' Camco 4-1/2' MMG
1148~ 6 7776' Camco 3-1/2' KBUG
11544' 7 7811' Camco 3-1/2' KBUG
12471' 8 ~ Camco 3-1/2' KBUG
12525' 9 ~..44' Camco 3-1/2'KBUG
13254' 10 8935' Camco 3-1/2'KBUG
13308' 11 8~71' Camco 3-1/2' KBUG
Perforation Data - DIL depths
0 13720/9155 13730-13786 56' 4/8
1 13828/9231 13828-1~ 10' 4/8
2 13870/9260 13870-13930 60* 4/8
3 14006/93,56 1._41"X~__'14080 20' 4
4 14088/9413 14115-14195 80' 8
5 14260~ 14320.143,53 33' 4/16
PB1D = 14524' MD
TD= 14545' MD
Datum = 13998' MD ( 9350' SS, 945E TVD)
35* 2571' Casing
35' 11376' Casing
1[]~(]8' 14546' Uner
35* 10863' Tubing
10864' 13604.' Tubing
CA, R-[[ RK 1/4' 1130
CA, R-[[ R K 5/16' 1170
CA, R-[[ RK 5/16' 1180
CA, R-[[ R K 3/8' 122]
CA, R*20 RK 3/8' 11~0
CA, BK BK*2 1/4' 1360
CA, BK BK-2 1/4' 13E]
CA, BK BK*2 5/16' 1420
CA, BK BK-2 5/16" 142]
CA, BK BK*2 5/16' orifice
CA, BK BK-2 5/16" orifice
Gauge Ring and HII Level Data
12-29-87 2.70' 14304' Notlghtspts
8-24-88 2.70" 14297' No tight spt~
1-2(]-92 2" WLM
6-10-92 2.70' 14273' WI.M
R E C E IV :;
OCT 'i!
Alaska Oil & Gas
Anchorage
JLB 9/1/92
FILL-UP,
KILL
LINE
ANNULAR
BOP
13~/~'3000 psi
PIPE RAMS
13%"5000 psi
BLIND RAMS
13%"5000 psi
FLOW,
SPOOL
~3~/~5000 ps~ CHOKE LINE~
-~4" 5000 psi il Ij 4" 5000 psi
PIPE RA~S
1
RISER
13%"
5000 ps!
A~ask~ Oil & Gas Cor~. ~,~,.,,,,,,ss~'"~
~nc~orage
ENERGY RESOURCES, ALAS'iKA~''
BOPE STACK
13 %" 5000 psi
NOTE, All changes must have prior written approval
of the drilling manager
FIGURE 6
ANGLED FILL UP LINE
1 0"
VENT
LINE
10" HYDRAULIC~
VALVE
FLEX HOSE
ANNULAR
IVERTE
I'ARGETED TURN
10" VENT LINE
^~aska OiI & Gas Cons. uomt~ss~o~--
Anchorage
NOTES:
ONE 10" DIVERTER LINE WITH A ~0" HCR VAkV£
HYDRAULICALLY ATTACHED TO THE ANNULAR IN A
FAIL-SAFE MANNER SO HCR WILL OPEN UPON CLOSURE
OF THE ANNULAR.
THE VENT LINE WILL BIFURCATE USING A TARGETED TEE
INTO AN EAST (PRIMARY) AND NORTH DIRECTION.
EACH LINE WILL BE EQUIPPED WITH A VALVE DESIGNED
IN A FAIL-SAFE MANNER THAT ENSURES ONE OF THE
BIFURCATED VENT LINES IS ALWAYS OPEN.
COOK INLET DRILLING
NOTE, All changes must have prior written approval
of the drilling manager.
STATE OF ALASKA ~ I'
ALASKA OIL AND ~ CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon :X Suspend _
Alter casing _ Repair well
Change approved program _
Operation Shutdown _ Re-enter suspended well _
_ Plugging _ Time extension _ Stimulate _
Pull tubing X Variance _ Perforate Other
2. Name of Operator
UNOCAL Corporation (ARCO Alaska, Inc. is
sub-o_Deratgr)
3. Address
P. O. Box 190247, Anchorage, AK
99519
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
4. Location of well at surface Leg 1, cond. 7, King Salmon Platform
725' N & 133' W of SE corner, Sec 17, T9N, R13W, SM
At top of productive interval
2027' S & 1895' E of NW corner, Sec 19, T9N, R13W, SM
At effective depth
1900' S & 1641' E of NW corner, Sec 19, T9N, R13W, SM
At total depth
1702' S & 1245' E of NW corner~ Sec 19, T9N~ R13W, SM
12. Present well condition summary
Total Depth: measured 14548 feet Plugs (measured)
true vertical 9842 feet
6. Datum elevation (DF or KB)
RKB 100
7. Unit or Property name
Trading Bay Unit
8. Well number
K-SRD
9. Permit number
84-184
10. APl number
50-733-20097-01
11. Field/Pool
Hemlock
14524'
Effective depth: measured 14524 feet Junk (measured)
true vertical 9 8 24 feet
14297'
Casing Length Size
Structural
Conductor
Surface 2 5 71 ' 1 3 - 3 / 8"
Intermediate
Production 1 1 3 76' 9 - 5 / 8"
Liner
Perforation depth: measured
See attached sheet
Cemented
Measured depth True vertical depth
true vertical
See attached sheet
YES 2571' 2285'
YES 1 1 376' 7705'
Tubing (size, grade, and measured depth)
4-1/2",N-80 BTC @ 10863MD; 3-1/2", N-80, BTC fr 10863'-13604'
Packers and SSSV (type and measured depth)
Baker FB-1 pkr @ 14295'md;Baker FHL@ 13560'md, Camco TRPD1-A @ 267'
RECEIVED
feet
JUN - § t'99)
Alaska Oil & Gas Cons. C0mnfission
,Anchorage
BOP sketch X
Suspended _
13. Attachments Description summary of proposal _ Detailed operation program X
P&A present BHLr Drill sidetrack to new BHL (Wellbore schematic attached).
14. Estimated date for commencing operation 15. Status of well classification as:
June 1, 1991 oi~ x Gas m
16. If proposal was verbally approved
Name of approver .. Date approved Service
17. I hereby ?~rtify that the foregoing is true and correct to the best of my knowledge.
.S'~Ined (,._~(::~ ~, {~,.~ Title
~ ~_ FOR COMMI~'SION USE OI~LY
Conditions of ap'l~r'oval: Notify Commission so representative may witness
BOP Test
I Ap p.r.,g val No.__
Plug integrity m _ Location clearance__
Mechanical Integrity Test_ Subsequent form require
ORIGINAL SIGNED BY
I..OklNIF C,. SMITH
Commissioner
SUBMIT IN TRIPLIOATE
.Approved b)/the order of the Commission
Form 10-403 Rev 06/15/88
K-8RD2
GENERAL PROCEDURE for P&A
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
RU ARCO Rig # 58.
MIRU wireline unit. Set plug in lower packer @ 14295"md.
Kill well.
ND tree. NU BOPE.
POOH. LD completion assembly leaving the top packer @ 13560'
in the hole.
MU 6" bit with scraper and RIH to top of packer.
Circulate hole clean. POH.
MU 7" retainer on DP and RIH. Set @ 13500'md.
Establish an injection rate. Cement squeeze Hemlock with 350
cu. ft. of slurry (leaving 500' of cement on top of retainer).
FK3-1.
MU 9-5/8" RTTS w/ 3 stands of 3-1/2" tail pipe on DP and RIH.
1 1) Test casing above TOL w/ 2500 psi.
12) Spot a 75 cu. ft. balanced plug (150' below and 100' above the
liner top). Squeeze as required. POH. WOC.
13) PU 8-1/2" bit and RIH and dress off top of plug at 10800'. POH.
Prepare to Side Track well K-8RD2
JUN ..~
Xllaska O# & ~as COns. Commission
Anchorage
K-8RD
APPLICATION FOR SUNDRY APPROVALS
PERFORATION DEPTHS
Existina oerforations
-- .
Interval
13734-13786
13828-13838
13870-13910
14115-14195
14320-14353
52
10
4O
8O
33
TVD
9265-9301
9331-9338
936O-9388
9533-9589
9677-9700
jt/mac 05/21/91
I £C£1vED
Alaska Oil & ~as Cons. Commission
~'~hora.g. e
K-8RD
P&A SCHEMATIC
TOTAL CMT VOL = 425 CU. FT
.4110 cu. ft x (10908-10800)
+.2085 x (11058-10908) = 75 cu.ft
.2085 cu.ft x (13560-13000)=120 cu.ft
::::::::::::::::::::::::::::::::::::
::x::x:**~:-'~:::; -'~"~ ::::::::::::::::::::::::::::::::
::::::::::::::::::::::::::::::::::::::::::::::::::::
:::::::::::::::::::::::::::::::::::::::::::::::::::::
====================================================
· , ::::::::::::::::::::::::::
===========================
=========================
::::::::::::::::::::::::::
::::::::::::::::::::::
.2085cu.ft/ft x (14295-13560) x 150%=230 cu.ft
==========================
:::::::::::::::::::::::::
::::::::::::::::::::::::::
:::::::::::::::::::::::::
::::::::::::::::::::::::::
X::X**:~.':X-':X**:X."
:::::::::::::::::::::::::::
::::::::::::::::::::::::::
=========================
::::::::::::::::::::::::::
=========================
::::::::::::::::::::::::::
::::::::::::::::::::::::::
=========================
10800'
10908'
11058'
.d11376'
13000'
13500'
13545'
13560'
14295'
14524'
JAT 5/22/91
- ~ STATE OF ALASKA
OIL AND GAS CONSERVATION COMI~,.'-~51ON ti~.i iL!~'
APPLICATION FOR SUNDRY APPROVALS
Suspend Operation Shutdown Re-enter suspended well
1. Type of Request: Abandon _ _
Alter casing _ Repair well
Change approved program _
_ Plugging _
Pull tubing _
I
Time extension
Variance
I
Stimulate
Perforate ~ Other
2. Name of Operator
UNOCAL Corporation
(ARCO Alaska. Inc. is sub-operator)
3. Address
P. O. Box 100360, Anchorage, AK 99510
!4. Location of well at surface
725' N, 133' W fr. SE cr.
At top of productive interval
2815' N, 3459'W fr. SE cr.
At effective depth
2976' N, 4003' W fr. SE cr.
At total depth
2981' N~ 4019' W fr. SE cr.
12. Present well condition summary
Total Depth:
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
5. Type of Well:
Development X
Exploratory _
Stratigraphic _
Service _
Sec. 17-T9N-R13W-SM
Sec. 19-T9N-R13W-SM
Sec. 19-T9N-R13W-SM
Sec. 19-T9N-R13W-SM
measured 1 4 5 4 8' feet
true vertical 9842' feet
Plugs (measured)
6. Datum elevation (DF or KB)
100' KB above M~;L
7. Unit or Property name
Trading Bay Unit
8. Well number
K-SRD
9. Permit number
84-184
feet
10. APl number
50-733-20097-01
11. Field/Pool
Hemlock
":~:'I" .... ...... '" i!"J::~ ''~,~ ~'~ :';"'~ :''~,i::r i'-,~;~""" "~
14524'
measured 14524' feet Junk (measured) 14297'
true vertical 9 8 24' feet
Length Size Cemented Measured depth
True verucal a'epm
2571' 13-3/8" yes 2571'
1 1 3 7 6' 9-5/8" yes 1 1 3 7 6'
3638' 7" yes 1 4 5 4 6'
measured
13734'-13786'; 13828'-13838'; 13870'-13910'
14115'-14195'; 14320'-14353'
true vertical
9265'-9301'; 9331'-9338'; 9360'-9388'; 9533'-9589';
2285'
7705'
9840'
9677'-9700'
Tubing (size, grade, and measured depth
4-1/2", 12.6#, N-80 BTC @ 10863' MD ; 3-1/2", 9.2#, N-80 BTC fm. 10863'-13604' MD
Packers and SSSV (type and measured depth)
Camco TRDP 1-A SSSV @ 267' MD; Baker FHL pkr @ 13560' MD; Baker FB-1 pkr @ 14295' MD
13. Attachments Description summary of proposal _ Detailed operation program .Z.. BOP sketch_
Proposed perforations attached.
14. Estimated date for commencing operation 15. Status of well classification as:
February, 1990 Oil ;~ Gas__ Suspended_
16. If proposal was verbally approved
Name of approver
Date approved
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~.~-~£/..,~, ~/~"~.~.~., Title Envi ronmenta 1 Enqi neer
D, R6bert FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness Plug integrity_ BOP Test_ Location clearance ~
Mechanical Integrity Test_ Subsequent form require lO-~C'z'}'
Date 2 / 8/90
IApprovj~l No
I --dr-cD
~.pproved by the order of the Commission
LONN!~ C,
Commissioner
Date
Form 10-403 Rev 5/03/89
Approved Copy
SUBMIT IN TRIPLICATE
SUMMARY OF PROPOSED WELL OPERATIONS
WELL TBU K-8RD
(February, 1990)
1. RU E-line unit.
2. Perforate the following intervals under draw-down conditions'
Run No. Bench Interval ~'MD-CET) Interval (MD-DIL)
Note:
.
I 3 I 4058-1 4078 14060-14080
2 2 I 3908-1 3928 13910-13930
3 0 I 3728-1 3758 13730-13760
Lubricator will be pressure tested to 2500 psig prior to each run.
RD E-line unit and lubricator.
Lenath*
20
20
30
70
SPF
E-Line BOPE's
Grease Head/
Hydraulic Packoff
Lubricator Extension
Manu al Rams
SWab Valve
Double Master
Valves
Wellhead
DML 7/22/88
('" STATE OF ALASKA ii'
ALASKA OILAND GAS CONSERVATION COM~',..o,ON ""~!i '""' '" ' ~'
REPORT OF SUNDRY WELL OPERATIONS !
1. Type of Request:
Operation Shutdown__ Stimulate ;K Plugging Perforate
Pull tubing Alter casing Repair well Pull tubing
Other
2, Name of Operator
UNOCAL Corporation
(ARCO Alaska. Inc. is sub-operator)
3. Address
P. O. Box 190247, Anchorage, AK 99519
5. Type of Well:
Development X
Exploratory _
Stratigraphic _
Service
4. Location of well at surface
725' N, 133'W fr. SE cr. Sec 17-T9N-R13W-SM
At top of productive interval
2815' N, 3459' W fr. SE cr. Sec 19-T9N-R13W-SM
At effective depth
2976' N, 4003' W fr. SE cr. Sec. 19-T9N-R13W-SM
At total depth
2981' N, 4019' W fr. SE cr. Sec. 19-T9N-R13W-SM
6. Datum elevation (DF or KB)
100' RKB
7. Unit or Property name
Trading Bay Unit
feet
8. Well number
K-SRD
9. Permit number/approval number
8-55~
10. APl number
50-133-2009701
11. Field/Pool
Hemlock
12. Present well condition summary
Total Depth: measured
true vertical
1 4548' feet
9 8 4 2' feet
Plugs (measured) 1 4524'
Effective depth:
measured 1 4 524' feet
true vertical 9824' feet
Junk (measured) 1 4 2 6 9'
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
13734'-13776';
9265'- 9294';
Length Size
2571' 13-3/8"
11376' 9-5/8"
3638' 7"
measured
13828'-13838'; 13870' -
true vertical
9331'- 9338';
Tubing (size, grade, and measured depth)
4-1/2", N-80 BTC @ 10863' MD;
Packers and SSSV (type and measured depth)
SSSV: Camco TRPD1-A @ 267' MD;
13. Stimulation or cement squeeze summary
Cemented Measured depth True vertical depth
Y~ 2571' 2285'
Y~ 11376' 7705'
Y~ 14546' 9840'
13910'; 14115' 14195'; 14320' 14353'
9360' - 9388'; 9533' - 9589'; 9677' - 9700'
3-1/2", N-80 BTC fm. 10863' - 13604' MD
Baker FHL pkr. @ 13560' MD; Baker FB-1 pkr @ 14295' MD
Intervals treated (measured) (All as shown above).
Treatment description including volumes used and final pressure (See attached Summary of Procedure).
14.
Representative Daily Average Production or In!ection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation (8/25/88) 46
16 39 6O0 100
Subsequent to operation (11/15/88)
15, Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
103 258 441 1000 150
16.
Status of well classification as:
Water Injector m
Oil X Gas Sp.speqded' ~':'i '" ;"Service
to the best of my knowledge. ;., '::. !: ..... ' ....... :,,,.~,.,, ',:i 'i'
17. I hereby certify that the foregoing is true and correct
Title Environmental Anal,¥st
Form 10-404 Rev 0 ,
m,,
Date 1 / 3/90
SUBMIT IN DUPLICATE
SUMMARY OF PROCEDURE
RE-PERFORATE AND ACID STIMULATE
WELL TBU K-8RD
.
.
.
RU E-line unit.
Re-perforated the following intervals under draw-down conditions:
Run No. Bench Interval (MD-CBL) Interval 0VID-DIll)
1 4 14173-14193' 14175-14195'
2 4 14153-14173' 14155-14175'
3 4 14133-14153' 14135-14155'
4 4 14113-14133' 14115-14135'
5 2 13888-13908' 13890-13910'
6 2 13868-13888' 13870-13890'
7 1 13826-13836' 13828-13838'
8 0 13753-13773' 13755-13775'
9 0 13733-13753' 13735-13755'
Length SPF
20' 4
20' 4
20' 4
20' 4
20' 4
20' 4
10' 4
20' 4
20' 4
TOTAL = 17 0'
NOTE: Lubricator was pressure tested to 2500 psig prior to each
RD E-line unit and lubricator.
gun run.
RU pumping equipment. Pressure tested lines to 4000 psig.
Mixed and pumped 15% HC1 acid tubing wash with additives. Additives included 0.2%
corrosion inhibitor, and 100g/1000 gal iron control agent. Produced back acid.
Mixed and pumped the following mud acid treatment: (Treatment pressure was maintained
under 4000 psi).
a) Pad Fluid: 1,750 gal (42 bbl) 2% NH4C1, 0.1% LOSURF-300 mixed in fresh water;
b) Acid Pre-flush: 1,750 gal (42 bbl) 7.5% HC1 acid with additives**;
c) Mud-Acid: 3,500 gal (83 bbl) 6% HC1/1.5% HF acid with additives**;
d) Clay Stabilizer Over-flush: 4,620 gal (110 bbl) 2% NH4C1, 0.1% LOSURF-300 mixed
in fresh water w/55 gal drum Cla-Sta® XP added slowly "on the fly";
e) Mutual Solvent Over-flush: 4,200 gal (100 bbl) 2% NH4C1 and 7% MUSOL mixed, in
fresh water;
f) Diverter Stage;
g) Repeated a-e;
h) Buffer: 672 gal (16 bbl) 2% NH4C1, 0.1% LOSURF-300 mixed in fresh water.
i) Tubing Displacement: 6,720 gal (150 bbl) filtered inlet water to displace tubing.
Additives included: 0.2% HAI-75 corrosion inhibitor, 20#/1000 gal FERCHEK-A iron
control agent, and 0.2% LOSURF-300 non-emulsifier.
7. RD pumping equipment. Returned well to production.
ARCO ALASKA INC.
Cook Inlet/New Ventures Engineering
TRANSMrYrAL
#74
TO: Commissioner
-COMPANY: AOGCC
DATE: Sept.26, 1988
FROM: Tom Wellman
COMPANY: 'ARCO Alaska, Inc
WELL NAME:Listed below
Transmitted herewith are the following
'Blue Sepia Sepia ....
, Line Folded Rolled M~rlar Tape
Perforated, Depth RecOlnl K-8RD 1 1 , ,
~ K-22RD 1 1
-~ K-18 1 1
,
,
Receipt Acknowledgement:
Return reciept to ARCO ALASKA, Inc.
"ATFN:'Judy Boegler ATO 1390A
Post Office Box 100360
Anchorage, AK 99510
STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon .~ Suspend .~ Operation Shutdown [] Re-enter suspended well [] Alter casing ~
Time extension ~ Change approved program F~ Plugging [] Stimulate ~ Pull tubing ~ Amend order [] Perforate ~ Other E3
2. Name of Operator 5. Datum elevation(DF or KB)
UNOCAL Corporation (ARCO Alaska, Inc. is sub-operator) 100' KB above NSL feet
3. Address 6. UnitorProperty name
Post Office Box 190247 Anchorage, AK 99519-0247 Trading Bay Unit
7. Wellnumber
K-8RD
4. Location of wellatsurface Leg 4, cond. 25, King Salmon Platform
725' N, 133' W fr. SE cr. Sec. 17-T9N-R13W-SM
Attop ofproductiveinte~al
2815' N, 3459' W fr. SE cr. Sec.
Ateffective depth
2976' N, 4003' W fr. SE ct. Sec.
Attotaldepth
2981' N, 4019' W fr. SE ct. Sec.
19-T9N-Rt3W-SM
19-T9N-R 13W-SM
19-T9N-R 1 ~W-SM
8. Permit number
84-184
9. APl number
50-- 133-20097 -01
10. Pool
~emlock
measured 14548 '
true vertical 9842 '
feet
feet
Plugs (measured) 14524 '
11. Present well condition summary
Total depth:
Effective depth: measured
true vertical
feet
feet
14524'
9824'
Size
13-3/8"
9-5/8"
__
7"
Junk (measured) 14269 '
Cemented Measured depth True Vertical depth
yes 2571' 2285'
yes 11376' 7705'
yes 14546' 9840'
; 13828' - 13838';
; 14320' - 14353'
Casing Length
Structural
Conductor
Surface 2571 '
Intermediate 11376 '
Production __
Liner 3638'
Perforation depth:
Measured: 13734' - 13776'
14115' - 14195'
True Vertical: 9265' - 9294'; 9331' - 9338';
~bing(size, grade and measured depth)
4-1/2", N-80 BTC @ 10863' MD; 3-1/2", N-80 BTC fm.
Packers and SSSV(type and measured depth)
Camco TRDP1-A SSSV @ 267' MD; Baker FHL pkr.
13870' - 13910'i
9360' - 9388'; 9533' - 9589';
9677' - 9700'
10863' - 13604' MD
@ 13560' MD; Baker FB-1 pkr ~ 14795' MD
Detailed operations program ~ BOP sketch []
~ ~ ~ ~,..-- .
12.Attachments Description summary ofproposal []
Proposed perforations attached.
J U L 1 5 1388
Dat~8~ ..... r C." .......... ' ·
........ .... ,, ~_ ,,,:;,dR:.;,I¢.'}.
13. Estimated date for commencing operation
Auc~u~, 1988
14. If proposal was verbally approved ~-umsequent 7v¥-or~ i~eportO~i on
Fo.un No .... .~ Dated_J__/__
Name of approver
7/14/88
15. I hereby certify that the foregoing is true and correct to the best of my knowledge J-l;',:'..
Roy~B. P~ e r.~s ~
Signed ./~,~¢,~,/.~. - .~¢7f/.~.~ ~ Title Environmental En~lineer Date
Commission Use Only
Conditions of approval
OR
Approved by
Notify commission so representative may witness I Approval No.
[] Plug integrity [] BOP Test [] Location clearanceI
~,PDrnved Copy
'Retu~rne~
S!~,,NED ElY --~~:¢'7 by order of
Commissioner the commission Date"~
Form 10-403 Rev 12:,,i
SUMMARY OF PROPOSED WELL OPERATIONS
WELL TBU K-8RD
.
.
RU E-line unit.
Re-perforate the following intervals under draw-down conditions:
Run No. Bench Interval (MD-CBL) Interval (MD-DIL) Length SPF
1 4 14173-14193' 14175-14195' 20' 4
2 4 14153-14173' 14155-14175' 20' 4
3 4 14133-14153' 14135-14155' 20' 4
4 4 14113-14133' 14115-14135' 20' 4
5 2 13888-13908' 13890-13910' 20' 4
6 2 13868-13888' 13870-13890' 20' 4
7 1 13826-13836' 13828-13838' 10' 4
8 0 13753-13773' 13755-13775' 20' 4
9 0 13733-13753' 13735-13755' 20' 4
TOTAL = 170'
NOTE: Lubricator will be pressure tested to 2500 psig prior to each gun run.
RD E-line unit and lubricator.
RU pumping equipment. Pressure test lines to 4000 psig.
Mix and pump 15% HC1 acid tubing wash with additives. Additives will include 0.2%
corrosion inhibitor, and 100fO/1000 gal iron control agent. Produce back acid.
6. Mix and pump the following mud acid treatment:
a) Pad Fluid: 1,750 gal (42 bbl) 2% NH4C1, 0.1% LOSURF-300 mixed in fresh water;
b) Acid Pre-flush: 1,750 gal (42 bbl) 7.5% HC1 acid with additives**;
c) Mud-Acid: 3,500 gal (83 bbl) 6% HC1/1.5% HF acid with additives**;
d) Clay Stabilizer Over-flush: 4,620 gal (110 bbl) 2% NH4C1, 0.1% LOSURF-300 mixed
in fresh water w/55 gal drum Cla-Sta® XP added slowly "on the fly";
e) Mutual Solvent Overrflush: 4,200 gal (100 bbl) 2% NH4C1 and 7% MUSOL mixed in
fresh water;
f) Diverter Stage;
g) Repeat a-e;
h) Buffer: 672 gal (16 bbl) 2% NH4C1, 0.1% LOSURF-300 mixed in fresh water.
Although 16 bbls should be available, use whatever volume is left in the mud pits; and
i) Tubing Displacement: 6,720 gal (150 bbl) filtered inlet water to displace tubing.
** Additives include: 0.2% HAI-75 corrosion inhibitor, 20#/1000 gal FERCHEK-A iron
control agent, and 0.2% LOSURF-300 non-emulsifier.
7. RD pumping equipment. Return well to production slowly.
JUL 1 5 1,.,o88
Alaska 0il & '.'2::~ ~'_ ,, C.:::.:'::;,js;jor~
ATTAC~U=~,T ~,~ ~
E-Line BOPE's
KING SALMON PLATFOP~M WELL K-8RD
Grease Head/
Hydraulic Packoff
Lubricator Extension
- Manual Rams
Swab Valve
Double Maste~
ValVes
V~eiihead
RESERVOIR PRESSURE 3358 psi Oil & Water in Tubing
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
Union 0il Company of California (ARCO Alaska~ Inc. is sub operator) 84-184
3. Address 8. APl Number
909 W, 9th Avenue~ Anchoraqe, AK 99501_,. 50- 733-20097-01
4. Location of well at surface I I_OC~7-'~'N.~--~ 9. Unit or Lease Name
725' FSL, 133' FEL, Sec. 17, T9N, R13W, SM I VE~IFJ~D~..I ,,.. Trading Bay Unit
At Top Producing Interval Sur~c._~'/ 10. Well Number
2489' FNL, 1762' FWL, Sec. 19, T9N, R13W, SM ~B.H.__~ K-8RD
At Total Depth' ' 11. Field and Pool
2345' FNL, 1275' FWL, Sec. 19, T9N, R13W, SM
McArthur River
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Hemlock
100' MWL RKBI ADL 18777
12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions
11/17/84 04/24/85 05/07/85 100 feet MS LI 1
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost
14,548'MD, 9841 '] CD 14,524'MD, 9824'1 /I~Es [] NO [] 267 feet MD N/A
22. Type Electric or Other Logs Run
D IL/SP/BHCS/GR, LDT/CNL/GR/cAL, CBL/CNL/CCL/GR, Gyro, CET, Acoustical Cal, GR/CCL
-23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
24" N/A N/A Surf 400' 30" N/A
13-3/8" 61.0# J-55 Surf 2571' 18" 1750 sx Class G
9-5/8" 47.0# L-80/S-!)5 Surf 11,376' 12-1/4" 750 sx Class G .,
7" 29.0# L-80 10,908' 14,546' 8-1/2" 1050 sx Class G
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2"/3-1/i!" 14,308' 13,560' & 14,295' WLM
14,316'-14,340' MD w/4 spf, 90° phasing ~ 26. ACID, FRACTURE, CEMENTSOUEEZE, ETC.
9674'-9691 ' TVD ~ DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Cmt plug f/11,13( '- 200 sx Class G
14,340'-14,350' MD w/12 spf, 120° phasing 11,461'
9691 '-9699' TVD
27. ,N/A PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
I
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD ~
Flow Tubing Casing Pressure CALCULATED,.k. OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE "~
28. CORE DATA
..
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
None
' ~..,~-..~ ~ ........ ; ,--, ...~,., , ..... ~ -'.
.. , 'r,-:~...1- 1986
i,.,,~ "' .... ~:,',. L~,,'
· ~_---t ....
(DAM)~Ci/023
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30.
NAME
Top Hemlock
GEOLOGIC MARK. ER~
MEAS. DEPTH
TRUE VERT. DEPTH
9331'
FORMATION TESTS
Include interval tested, pressure data, all fluids recovered and gravity,
13,828'
GOR, and time of each phase.
N/A
31. LIST OF ATTACHMENTS
Gyroscopic Survey (2 copies)
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Title Environ. Eng. D.te 6/30/86
INSTRUCTIONS
General: This form is designed for subrnitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
ARCO Oil and Gas Company
Well History - Initial Report - Daily
Instructions: Prepare and submit the "Initial Report" on the first Wednesday afte; a well is spudded or workover operations ere started.
Daily work prior to spudding should be summarized on the form giving inclusive dates only,
District JCounty. parish or t~orougn
Alaska ] North Slope Borough
Field Lease or Unit
MacArchur River Field ADL #18777
Auth. or W.O. no. ITRle
AFE 495964 I Redrtll
State
Alaska
IWell no.
K8-RD
ARCO Parker Rig 58
API 50-733-20097-01
Operator
ARCO Alaska, Inc.
Spu~ddecl or W.O, begun
I ^RCO w.,. 12%
IH°ur 0600 Hfs. IPriOr status if a w'O'
Workover
11/12/84
Date and depth
as of 8:00 a,m.
11/13/84
11/14/84
11/15/84
11/16/84
Complete record for each day reported
7" @ 8826'-12,487'
8.8 ppg Brine
RU. Held pre-spud meeting. Lockdn screws seized up. Cut bowl
protector w/welder, cln & remove rust build up from wellhead.
Remove & repl lockdn screws on 9-5/8" hgt. NU &tst BOPE to
250/3000 psi. Displ well to brine while RIH. PU bit/scrpr, DO
top cmt plug in 9-5/8" csg. Cent RIH, PU DP, circ'g out old
mud.
7" @ 8826-12,487'
8.8 ppg Brine
RIH PU 5" DP. Tag cmt p~ug @ 8749', drl on plug to 8750'.
Circ old mud out w/8.8 brine. Test 9-5/8" csg to 2000 psi.
RIH & set BP @ 8740', POH, LD DP. MU spear, RIH, retrv pack
off. RIH w/csg latch-in spear, pull, had 8" movement. RU DA
to rn freept.
7" @ 8826-12,487'
2890' PBTD, 8740' BP, POH & LD 9-5/8" csg
8.8 ppg Brine
RIH w/APR freept, obtain readings f/2500' to 2850', POH. Rn
CCL tl assy f/2950'-2550'. RIH w/Howco EZSV, set @ 2890' WLM.
RIH 9-5/8" csg cutter, cut 9 5/8" @ 2850' DPM, POH. RIH w/9
5/8" spear, wrk 9 5/8" csg off hgr, att several times to pull
csg loose w/o success, POH. RIH w/spear tool assy, pull pipe
w/max pull & 9 5/8" csg pulled free. POH, LD 9 5/8" csg.
(Total of 26 jts LD @ rept time.)
13-3/8" @ 2571'
±2350' TOC, WOC
Wt. 9.4, PV 15, YP 10, PH 8.5, WL 8, Sol 5
Fin POOH & LD 66 jts + 1 cut piece, 9-5/8" csg. Chg pipe rams
to 5", tst to 250/3000 psi. RIH w/5" OEDP to 2850', C&C. Spot
balanced cmt plug w/400 sx C1 "G" cmt w/1.5% A-7. Displ w/8.7
ppg brine. CIP @ 1810 hrs, 1/15/84. POH w/OEDP, WOC. PU 12¼"
BHA & prep to RIH.
The above is correct
Signature
For form proparatlon ~d di~trt~ution,
soo Procedures Manual, Section 10,
Drilling. Pages 86 and 87.
Date 6/4/85 Irit'e
Drilling Superintendent
AR3B-459-1-D
INumber ali daily well history forms consecutively
as they are prepared for each well.
no.
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: Th~s form ~s used during dmHing or workover operations, I! testing, coring, or perforahng, show formalion name in describing work pertormed,
Number a;I drill slem tests sequenhally. Attach descrtptlon ol all cores Work performed by Producing Section will be reported on "Interim" sheets until final
completion. Report official or representative test on "Final" form, 11 Submit "lnlerim" sheets when I{Ited out bul not less trequently lhan every 30 days. or (2)
on Wednesday o~ the week in which oll str~ng is set, Submit weekly for workovers and loHowing setting ol od slrin~ until completion.
District
Field
Alaska
ICounty or Parish IState
North Slope Borough Alaska
ILease or Unit [Wel~ no.
ADL #18777 I K8-RD
MacArthur River Field
Date and depth
as of 8:08 a.m.
11/17/84
thru
11/19/84
11/2o/84
11/21/84
11/22/84
thru
11/26/84
Complete record for each day while drilling or workover in progress
13-3/8" @ 2571'
3315', (693'), Wsh & rm
Wt. 9.3, PV 12, YP 8, PH 10, WL 8.6, Sol 6.5
Fin WOC. TIH w/12¼" BHA, tag firm cmt @ @ 2321', CBU, tst
13-3/8" csg shoe to 1500 psi; OK. Dress cmt plug f/2321'-2622',
CBU. Chg over mud sys to 9.4 ppg. Conduct formation leak-off
tst to 11.1 ppg EMW, POOH. PU Navi-Drl to sidetrack well. RIH,
drl & surv 12¼" hole f/2622' - 3315'.
2622 49.9° S33.8W 2331.00 802.02 764.46
2744 48.3° S39.1°W 2410.82 878.03 838.60
2864 47.9° S46.9°W 2491.02 956.90 900.88
2966 48.9° 849.0°W 2558.78 1027.14 945.96
3043 49.0° S53.5°W 2609.31 1081.81 991.30
3170 49.0° S60.2°W 2692.63 1174.74 1043.68
3273 50.9° S61.6°W 2758.90 1252.38 1082.02
13-3/8" @ 2571
4407', (1092'), POOH w/bit
Wt. 9.5, PV 10, YP 6, PH 10, WL 8.0, Sol 7.5
Drl & surv 12¼" hole to 4407.
3483 51.6° S60.6°W 2890.34 1413.76 1161.17
3649 51.4° S60.9°W 2993.60 1541.64 1224.65
3870 50.6° S60.3°W 3132.76 1710.89 1307.65
3990 50.0° S60.6°W 3209.41 1801.82 1352.48
4116 49.7° S60.6°W 3290.65 1896.50 1399.76
4244 50.4° S60.9°W 3372.85 1993.17 1447.70
4331 50.5° S60.9°W 3428.24 2059.23 1480.33
1094.04
1207.39
1357.74
1438.46
1522.36
1607.98
1666.59
13-3/8" @ 2571
5095', (688'), POH w/bit #5
Wt. 9.5, PV 18, PH 9.5, WL 8.2, Sol 9.5,
Tst BOPE to 250/3000 psi. TIH w/BHA, drl & surv to 5095'.
4559 50.0° S62.3°W 3574.03 2232.22 1563.70
4780 49.7° S62.3°W 3716.53 2399.24 1642.22
5003 48.6° 863.7°W 3862.39 2566.32 1718.80
1820.79
1970.35
2120.64
13-3/8" @ 2571
7759', (2664'), Tst'g BOPE
Wt. 10, PV 17, YP 11, PH 10, WL 5.8, Sol 12.5
Drl & surv 12¼" hole to 7759', POOH. Prep to tst BOPE.
5256', 47.2°, 863.4W, 4032 TVD, 2752 VS, 1802S, 22888
5570', 46.5°, S65.5W, 4245 TVD, 2986 VS, 1902S, 2496W
5859', 52.9°, S65.8W, 4435 TVD, 3197 VS, 19918, 2694W
6572', 53.8°, S67.6W, 4847 TVD, 3777 VS, 22268, 3227W
7156', 51.8°, S70.1W, 5202 TVD, 4241. VS, 2394S, 3659W
7626', 48.4°, 871.8W, 5503 TVD, -- 2511S, 4000W
584.02
638.79
699.66
756.29
801.57
881.77
950.66
The above is correct
· 6/04/85 Drilling Superintendent
For form preparation and distri~tion
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
AR3B-459-2-B
INumber all daily well history forms consecutively
as they are prepared for each well.
IPa~e no
ARCO Oil and Gas Company
Daily Well History--Interim
Instruclions: This form is used during drilling or workover operations, If testing, conng or perforating, show Iormation name ~n describing work performeQ.
Number aH drill stem tests sequentially. Attach description of alt cores. Work performed by Producing Section wll] be reported on "interim" sheets unhl f~n,~l
completion. Report offlcia~ or representative test on "Pinal" form. 1) Submit "interim" sheets when filled out bu[ not less frequently than every 30 days. or
on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting Ot Oii strinG unlil completion
Alaska North Slope Borough
Field ]Lease or Unit
MacArthur River Field I ADL #18777
Date and deptll Complete record for each day white drilling or workover in progress
as of 8:00 a.m.
Alaska
Well no,
KS-RD
11/27/84
11/28/84
11/29/84
11/30/84
12/01/84
thru
12/03/84
12/04/84
13-3/8" @ 2571'
7909', (150'), Drlg
Wt. 10, PV 18, PH 10, W-L 5.4, Sol 11,
Fin tst'g BOPE. PU/BHA, wsh 42' to btm. Drl & surv to 7909'
--
7779 47.3 S74.6W 5606 4715 2544 4108
7843 48.4 S76.0W 5649 4762 2556 4154
7902 50.4 S76.4W 5687 4807 2567 4197
7968 52.1 S77.1W 5728 4858 2579 4248
13-3/8" @ 2571'
8240', (231'), Drlg
Wt. 10, Vis 44, PV 17, PH 10, WL 5.4, Sol 12
Drl & surv to 12-1/4" hole to 8240'.
7875', 49.6°, S76.0W, 5670 TVD, 4786 VS, 2562, 4177
7939', 51.2°, S77.1W, 5710 TVD, 4835 VS, 2574, 4225
8030', 54.2°, S77.4W, 5766 TVD, 4907 VS, 2590, 4296
13-3/8" @ 2571'
8331', (91'), RIH w/Bit #13
Wt. 10, Vis 42, PV 14, PH 10, WL 5.2, Sol 12
Drl & surv 12¼" hole to 8331', POOH f/bit chg.
8198', 56-1/4°, S79.0W, 5861, 5044, 2618S, 4431W
8311', 56-1/4°, S78.0W, 5924.72, 5137.47, 2636.96S, 4523.64W
13-3/8" @ 2571'
8721', (390'), Drlg
Wt. 10, Vis 41, PV 15, PH 10, WL 5.4, Sol 11
RIH w/bit #13, drl & surv 12¼" hole to 8721'.
8586', 55-1/4°, S81W, 6075.49 , 5362.20, 2678.39S, 4747.11W
13-3/8" @ 2571'
9463', (742'), POOH into csg
Wt. 10.I, Vis 431, PV 15, PH 11, WL 5.3, Sol 12
Drl & surv 12¼" hole to 9463', POOH into csg while repairing
rotary.
8733', 54-3/4°, S78W, 6163.81TVD, 5481.24 VS, 2700.33S, 5481.24W
9059', 54°, S79W, 6353.70 TVD, 5743.90 VS, 2753.16S, 5125.16W
9209', 52-1/2°, S81W, 6443.45 TVD, 5862.56 VS, 2774.03S, 5243.51W
9381', 52-1/4°, S81W, 6548.45 TVD, 5996.68 VS, 2795.34S, 5378.06W
13-3/8" @ 2571'
9463', (0'), Wait on rotary brake drum
Wt. 10.1, PV 15, YP 10, PH 10, WL 5.4, Sol 12
POOH inside csg @ 2500' for rig repair. Wait on clutch & rotary
brake drum.
The above is correct
Signature~_~~ ~
Drilling, Pages 86 and 87
IOate {TiHe
6/04/85
Drilling Superintendent
AR3B-459-2-B
INumber all daily well history forms consecutively /Pa~e no
as they are prepared for each well.
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form is used dunng dtllhng or workover operations. If testing, coring, or perlorahng, show ~ormation name in descrlbinq work performed.
Number all drill stem tests sequentially. Attach descrlphon of alt cores. Work performed by Producing Section will be reported on "Interim" sheets until final
completion. Report olliclal or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequenHy than every 30 dayS, or
on Wednesday of the week in which o,I string is set. Submit weekly for workovers and following sethng of o~1 string unhl completion.
District
Field
Date and del3th
as of 8:00 a.m.
Alaska County or Parish North Slope Borough
MacArthur River Field Lea,eorUn~t ADL #18777
Complete record for each day while drilling or workover in progress
12/05/84
12/06/84
12/07/84
12/08/84
thru
12/10/84
12/11/84
12/13/84
12/12/84
IState
Alaska
Well no.
KS-KD
13-3/8" @ 2571'
9463', (0'), Tst motor sys
Wt. 10.1, PV 15, YP 10, PH 10, WL 5.4, Sol 12
Repair clutch & drum coupling on rotary mtr.
system & prep to POOH f/bit chg.
Function tst motor
13-3/8" @ 2571'
9570', (107'), Drlg 12¼" hole
Wt. 10.1, PV 18, YP 12, PH 10, WL 4.8, Sol 13
TOH f/bit chg, tst BOPE. TIH to 9400', wsh to 9463'
9570'.
· Drl to
13-3/8" @ 2571'
9772', (202'), Drlg 12¼" hole
Wt. 10.2, PV 16, YP 10, PH 10, WL 5.2, Sol 13
Drl 12¼" hole to 9631', 12 std short trip. Drl & surv to 9772'.
9660', 50¼°, S82W, 6723 TVD, 6210.5 VS, 2827.5S, 5593W
13-3/8" @ 2571'
10,249', (477'), TOH
Wt. 10.2, PV 15, YP 13, PH 10, WL 4.4, Sol 13
Drl & surv 12¼" hole to 10,249'.
9727', 50°, S83W, 6766 TVD, 6261VS, 2834S, 5644W
10,012', 48-1/4°, S84W, 6952.5 TVD, 6471VS, 2858.6S, 5858.6W
13-3/8" @ 2571'
10,486', (237'), Drlg
Wt. 10.2, PV 16, YP 10, PH 10, WL 5.2, Sol 12
Drl & surv 12¼" hole to 10,486'.
10,167', 48-3/4°, S87W, 7055 TVD, 6583 VS, 2867S, 5974W
13-3/8" @ 2571'
10,492', (6'), TOH to Chg BHA
Wt. 10.2, PV 19, YP 13, PH 10.0, WL 5.2, Sol 13
Drl hole f/10,486'-10,492', circ, POH. MU BHA #16, TIH, brk
circ@ 3000' & 6000'. Orient Navi-Drl & att to drl w/o success.
Wk pipe, pipe stuck. W'k pipe free, circ& pmp pill, TOH.
10,405', 55, West, 7202 TVD, 6761VS, 2872S, 6161W
13-3/8" @ 2571'
10,567', (75'), Navi Drl
Wt. 10.2, PV 16, YP 12, PH 10.0, WL 5.3, Sol 13
Chg BHA, RIH w/Navi drl, drl & surv f/10,492'-10,567'
10,405'MD 55° West 7202.10' 6761.89 S2872.61 6161.09W
10,526'MD 57° S89.7W 7269.76' 6856.76 S2872.87 6261.40W
The above is correct
Signature
For form preparation and distributio~
see Procedures Manual Section 10, --
Drilling, Pages 86 and 87
Dale 6/05/84
Drilling Superintendent
AR3B-459-2-B
INumber all daily well history forms consecutively ~Pa%e no.
as they are prepared for each welt.
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form is used during drilling or workover operations, If testing, coring, or pedoratmg, show lormation name in describing work Derlormedl.
Number a~l drdl stem tests sequentrally, Attach description of all Cores. Work performed by Producing Section will be reportec[ on "Interim" sheets until finat
comp[ehon. Report oHicla~ or representative test on "Final" Iorm. II Submit "Interim" sheets when h[led out bul not [ess frequently than every 30 days. or (2)
on Wednesday of the week in which oil string is set. Submit weekly Ior workovers and following seltlng ol oil strinG until completion.
District
Field
Date and depth
as of 8:00 a.m.
Alaska County or Parish North Slope Borough
Lease or Un t
MacArthur River Field ADL #18777
Complete record for each day while drilling or workover in progress
12/14/84
12/15/84
thru
12117184
12/18/84
12/19/84
12/20/84
12/21/84
State
Alaska
Well no.
K-dt~D
13-3/8" @ 2571'
10,628', (61'), Navi Drl & MWD w/Bit #21 @ 10,628'
Wt. 10.2, PV 19, YP 13, PH 10.0, WL 5.2, Sol 13
Navi drl & surv f/10,567'-10,628'.
10,537'MD 57.1° S89.7W 7275.74' 6865.50' S2872.92
10,585'MD 56.1° S88.1W 7203.16' 6903.61' S2873.69
6270.63W
6310.70W
13-3/8" @ 2571'
10,836', (198'), Drlg
Wt. 10.2, PV 16, YP 10, PH 10.0, WL 5.4, Sol 13
Navi drl & surv f/10,628'-10,719', POOH f/rotary table repair.
DP parted bet Jt 16 & 17. POOH inside 13-3/8" csg shoe @ 2500'.
RIH w/3-1/4" OD spear, spear into 5" DP stub, pull jt 17 & 18 &
LD. Cont to POOH. Drl & surv 12-1/4" hole f/10,719'-10,836'.
10,585', 56.1°, S88.1W, 7302.16, 6903.61, S1873.69, 6310.70W
10,772', 51.5°, S79.9W, 7415.26, 7049.19, S2893.05, 6458.06W
13-3/8" @ 2571'
10,976', (140'), POOH f/BHA & Bit Chng
Wt. 10.2, PV 15, YP 10, PH 10.0, WL 5.1, Sol 13
Drl & surv 12-1/4" hole f/10,836'-10,976'.
10,916'MD 50.7° S80.3W 7506.03, 7159.50', S2911.98
6568.23W
13-3/8" @ 2571'
11,090', (114'), Drlg
Wt. 10.2, PV 16, YP 11, PH 10, WL 5.1, Sol 14 '
Drl & ~urv to 11,090'.
11,006', 50.4°, Sdl.OW, 7563.30, 7227.93, 2923.30S, 6636.73W
13-3/8" @ 2571'
11,294', (204'), TOH
Wt. 10.2, PV 16, YP 11, PH 10, WL 5, Sol 13
Drl to 11,215', 12 std short trip. Drl to 11,294', circ, TOH.
11,037', 50.2°, SdlW, 7583 TVD, 7251VS, 2927S, 6660W
11,164', 51.9°, S81.7W, 7663 TVD, 7349 VS, 2942S, 6758W
11,196', 51.9°, S81.3W, 7682 TVD, 7373 VS, 2946S, 6783W
13-3/8" @ 2571'
11,481', (187'), Drlg
Wt. 10.2, PV 17, YP 12, PH 10, WL 4.9, Sol 14
Drl & surv 12¼" hole to 11,452', 15 std wiper trip. Drl to
11,481'.
11,224', 52.5°, S82W, 7699 TVD, 7395 VS, 2949S, 6805W
11,382', 53°, S82.3W, 7795 TVD, 7518 VS, 2966S, 6924W
The above is correct
Signature
z/)~ ~..~_,,-,~.
For form ~'~eparation and/~l~stribution
see Procedures Manual S~'ction 10,
Drilling, Pages 86 and 87
Date Title
6105184
Drilling Superintendent
AR3B-459-2-B
Number all daily well history forms consecutively ]Pa~e no.
as they are prepared for each well.
t
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: Th~s form is used during drilling or workover operations. If testing, conng, or perforaling, show Iormatlon name in describing work perlormed.
Number a;I drill stem tests sequentially. Attach descrlpl~on ol all cores. Work performed by Producing Section will be reported on "Interim"' sheets unhl
complehon. Report official or representative test on "Final" lotto. 1 Submit "Interim" sheets when filled out but not less lrequently than every 30 days. or
on Wednesday of the week in whicll oit string is set. Submit weekly for workovers and following selling ol od strin(:j unhl comclet on.
District ICounty or Parish is.ts
Alaska North Slope Borough
Field ~Lease or Unit
MacArthur River Field I ADL #18777
Complete record lot each day while drilling or workover in progress
Alaska
Date and depth
as of 8:00 a.m.
12/22/84
thru
12/26/84
12/27/84
12/28/84
12/29/84
thru
12/31/84
Well no.
K-8RD
13-3/8" @ 2571'
11,662', (181'), TOH
Wt. 10.2, PV 17, YP 12, PH 10, WL 4.2, Sol 12
Drl 12¼" hole f/11,481'-11,662', TOH f/bit chg. TIH, lost pmp
press, TOH, left BHA & 3 stds DP in hole. TIH w/fsh'g tl assy,
screw into fsh, wrk pipe & jar on fsh. RU DA & APR, rn freept.
Spot 25 bbls SFT. RU DA, rn back-off shot @ 10,954' WLM. RIH
w/chisel tl, wrk tl thru @ 10,954', TOH. TIH, fire back-off
shot @ 11,510' WLM, TOH. Rn freept, C&C mud, CBU. Re-rn
freept. TIH w/back-off shot, shot @ 11,373', TOH w/fsh'g assy &
partial fsh. Pull 26 stds, wrk pipe thru tight spot, string
parted, TOH. MU Tri-State fsh'g tls, TIH, screw into fsh @
2944', TOH w/partial rec'y. RU DA & APRS, rn freept. RU, fire
back-off shot, TOH.
(Fsh #1 = 289' w/TOF @ 11,373', Btm @ 11,662' - Fsh #2 = 2931'
w/TOF @ 5942', Btm @ 8,873')
13-3/8" @ 2571'
11,662', (0'), TOH
Wt. 10.2, PV 15, YP 10, PH 10, WL 5.0, Sol 11
Cont fsh'g operations, rec'd 1380' DP. TOH w/fsh'g assy #3.
13-3/8" @ 2571'
11,662', (0'), POH w/fsh'g assy
Wt. 10.2, PV 15, YP 10, PH 10, WL 4.2, Sol 11
POOH w/fsh'g assy #3, rec'd 44 its "E" DP. RIH w/fsh'g assy, PU
S-135 DP, tag TOF @ 7540', wrk pipe, POOH, hit keyseat @ 6500'.
Set rotary slips, rm thru keyseat f/6500'-6480'. Cont POOH
w/fsh'g tl assy & DP. (Fsh #1, TOF @ 11,323', Btm @ 11,662' -
Fsh #2, TOF dropped to 7540', length 1551').
13-3/8" @ 2571'
11,662', (0'), POH w/fsh'g assy #5
Wt. 10.2+, PV 16, YP 10, PH 10, WL 5.0, Sol 11
Fin POOH w/fsh'g assy #3. PU 12¼" BHA, RIH, make CO rn, CBU,
POOH, hit key seat @ 6800'. Rm 6800'-6797', cont POOH, hit key
seat @ 6453'. Rm 6453'-6449', cont POOH, LD BHA. PU fsh'g assy
#4, RIH, wrk'g pipe, CBU, wsh fill f/7196'-7315', screw into fsh
@ 7316' DPM, jar on fsh. RIH w/CCL tl, log f/7589'-7222'. RIH
w/APR freept/CCL tl to 7335'; pipe free @ 7310', partial stuck @
7325', completely stuck @ 7330', POOH, LD freept tl assy.
w/string shot assy, fire shot @ 7304' WLM, pipe parted @ 7304',
POOH. RIH w/fsh'g assy #5, tag TOF @ 7316' DPM, wsh & rm w/shoe
& wshpipe f/7316'-7503', PU pipe, CBU, POOH w/no rec'y. RIH
w/fsh'g assy #5, att to rotate over TOF @ 7316' DPM w/o success,
POOH.
The above ia correct
Signature
For form prep~ratio~ ~nd/[d~stri~u~ion
see Procedures Manual S'~clion 10,
Drilling, Pages 86 and 87
IDate ITitle
6/05/84
Drilling Superintendent
AR3B-459-2-B
Number all daily well history forms consecutively
as they are prepared for each well.
lP a~)e no
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form ,s used dumncl .dmlling or workover operations. If testing, coring, or oerforahng, show formation name in describlncl work performed.
Number ail drill stem tests secluentlaliy. Attach description of all cores Work performed by Producing Section will be reported on "Interim'-' sheets until final
comptebon. Report off~clat or representative test on "Final" form. 1~ Submit "interim" sheets when hlied out but not less frequently than every 30 days. or
on Wednesday of the week in which od string is set, Submit weekly Ior workovers and Iollowing setting of oil strin¢; until comp[et on.
District
Field
Alaska
County or Parish State
North Slope Borough
ILeasa or Un t ADL #18777
Alaska
MacArthur River Field
no.
K8-RD
Date and depth
as of 8:00 a.m.
1/01/85
thru
1/02/85
1/03/85
1/04/85
1/07/85
1/o8/85
1/o9/85
Complete record for each day while drilling or workover in progress
13-3/8" @ 2571'
11,662', TOC @ 7020', POOH w/5" OEDP & LD Grade "E" DP
Wt. 10.2, PV 15, YP 11, PH 10, WL 5.2, Sol 12
Fin POOH w/fsh'g assy #5; no rec'y. RIH w/fsh'g assy #6,
screwed into fsh @ 7316', att to jar fsh out of keyseat, POOH
w/fsh'g assy #6; rec'd partial fsh. Suspend fsh'g operations,
prep to spot 300' cmt plug & sidetrack. RIH w/5" OEDP to 7320'
(TOF stub @ 7326'). M&P 696 sx Cl "G w/D31-L & 3 gal/lO0 sx
R-12L. Displ w/120 bbls, 10.2 ppg mud. CIP @ 2345 hfs, i/1/85.
Rev circ DP cln, POOH w/5" OEDP.
13-3/8" @ 2571'
6970', Top of plug @ 6942', Kick'g off cmt plug
Wt. 10.2, PV 17, Y? 12, PH 11, WL 5.4, Sol 12
Fin POOH w/5" OEDP. Set tst plug, tst BOPE; OK, pull tst plug.
TIH w/BHA, PU G-105 5" DP, tag top of cmt plug @ 6907', polish
off to hard cmt @ 6942', circ hole cln, TOH. TIH w/Navi-Drl,
drl to 6970'.
13-3/8" @ 2571'
7056', (86'), Navi-Drlg
Wt. 10.2, PV 15, YP 10, PH 11, WL 5.0, Sol 12
Drl 12¼" hole to 7056'.
13-3/8" @ 2571'
7817', (761'), MU BHA
Wt. 10.2, PV 16, YP 11, PH 10.5, WL 5.0, Sol 13
Navi-Drl, drl & surv 12¼" hole to 7617', POH.
7112', 50.7°, S60W, 5177 TVD, 4203 VS, 2391S, 3620W
7300', 52.1°, S63.0W, 5274 TVD, 4349 VS, 2459S, 3750W
7520', 53.5°, S65.1W, 5428 TVD, 4522 VS, 2537S, 3907W
7738', 56.3°, S64.4W, 5553 TVD, 4700 VS, 2614S, 4068W
13-3/8" @ 2571'
8203', (379'), Drlg
Wt. 10.2, PV 17, YP 12, PH 10.0, WL 5.0, Sol 13
TIH, rm 75' to btm. Drl & surv 12¼" hole to 8203'.
8015', 55-1/2°, S65.5W, 5708 TVD, 4928 VS, 2711S, 4276W
13-3/8" @ 2571'
8401', (198'), Drlg
Wt. 10.2, PV 20, YP 10, PH 10.0, WL 5.2, Sol 12.5
Drl & surv 12¼" hole to 8401'.
8202', 52-1/2°, S67W, 5818 TVD, 5078 VS, 2772S, 4414W
The above is correct
Signature
For form preparation and dlStj{butlon
see Procedures Manual Sectian 10,
Drilling. Pages 86 and 87
IDate 6/05/85 [Ti,,e
AR3B-459-2-B
Number all daily well history forms consecutively [Page no
as hey are prepared for each well.
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form is used during drilling or workover ooerations, if lesting, coring or perforaling, show formation name in describing work performe~l.
Number aH drill stem tests sequentially. Attach description of all cores. Work 0erformed by Producing Section will be reported on "Interim" sheets until lin:at
completion. Report official or reDresentative test on "Final" form. 11 Submit "Interim" sheets when hlled out but not less freQuenlly than every 30 days, or (2}~
on Wednesday el the week in which oil string is set. Submit weekly for workovers and Iollowing setting of oll strlnq until completion.
District
Field
Data and deC, th
aa of 8:00 a.m.
Alaska County or Parish North Slope Borough
Lease or Un t
MacArthur River Field ADL #18777
Complete record for each day while drilling or workover in progress
1/lO/85
1/11/85
1/12/85
thru
1/14/85
1/15/85
1/16/85
]./17/85
1/18/85
State
13-3/8" @ 2571'
8738', (337'), Drlg
Wt. 10.2, PV 18, YP 10, PH 10.0, WL 5.1, Sol 12
Drlg f/8401'-8738'. No tight spots.
8510', 54°, S68W, 6002.85 TVD, 5325.26 VS, 2866.75S, 4642.79W
13-3/8" @ 2571'
8796', (58'), Prep to RIH w/Bit #31 & BHA #29
Wt. 10.2, PV 20, YP 10, PH 10.0, WL 4.8, Sol 12
Drld & surv'd fr/8738'-8796' (58'), POOH. Chg bit & BHA, RIH,
att to circ- could not. POOH, found cmt scale in DP & bit
plugged. RIH.
8681', 54-1/2°, S69W, 6102.75, 5463.91, 2917.61S, 4771.91W
13-3/8" @ 2571'
9650', (854'), Drlg w/bit #33 @ 9650'
Wt. 10.2, PV 16, YP 9, PH 10.0, WL 5.1, Sol 13
Drld & surv'd fr/8796'-9650' (854').
8947', 54°, S73W, 6258.16, 5679.74, 2987.88S, 4975.99W
9195', 53-1/2°, S72W, 6404.81, 5879.66, 3048.02S, 5166.73W
9390', 53-1/4°, S72W, 6521.14, 6036.13, 3096.38S, 5315.57W
13-3/8" @ 2571'
9940', (290'), Drlg w/bit #33 @ 9940'
Wt. 10.2, PV 16, YP 10, PH 10.0, WL 5.2, Sol 13
Drl & surv 12¼" hole to 9940'.
9702', 52°, S76W, 6710.53 TVD, 6283.65 VS, 3164.71S, 5553.85W
13-3/8" @ 2571'
10,135', (195'), Drlg w/bit #34 @ 10,135'
Wt. 10.2+, PV 17, YP 11, PH 10.0, WL 5.1, Sol 13
Drl & surv f/9940'~10,135' (195').
9926', 50-1/4°, S76W, 6851.11, 6457.34, 3206.90S, 5723.05W
13-3/8" @ 2571'
10,265', (130'), Tst BOPE
Wt. 10.2, PV 17, YP 11, PH 10, WL 5.0, Sol 13
Drl 12¼" hole to 10,265', TOH.
13-3/8" @ 2571'
10,545', (280'), Drlg 12¼ hole
Wt. 10.2+, PV 18, YP 13, PH 10, WL 5.1, Sol 13
Tst BOPE to 250/3000 psi. MU BHA #32, TIH, drl & surv to
10,545'
10,176', 49-1/2°, S77W, 7012 TVD, 6647 VS, 3251S, 5908W
Alaska
Well no.
The above is correct
Signature
For form preparation and distr~utio~-
see Procedures Manual Sectlol'f' 10,
Drilling, Pages 86 and 87
Date ITitle
6/05/85
Drilling Superintendent
AR3B-459-2-B
Number all daily well history forms consecutively
as they are prepared for each well.
IPa~e no,
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This Iorm ~s used durmg drdling or workover operations. If testing, coring, or perforaling, show formalion name in describing work Derlormed.
Number all drdl stem tests sequentially. Attach descrlDhon Of all cores. Work performed by Producing Section will be reported On "Interim" sheets unlil final
compiel~on Report official or representative test on "Final" form. 11 Submit "Interim" sheets when filled DUI but not less frequently Ihan every 30 days. or (2}
on Wednesday ot the week in which o~1 String ~s set. Submit weekly for workovers and follow ng sett ng of oi strln,c un I compie ~on
District
Field
Date and depth
as of 8:00 a.m.
l lCounty or Parish
Alaska North Slope Borough
Lease or Unit
MacArthur River Field ADL (t18777
Complete record for each day while drilling or workover in progress
1/19/85
thru
1/21/85
1/22/85
1/23/85
State
Alaska
IWell no.
~8-RD
13-3/8" @ 2571'
11,079', (534'), Drlg 12¼ hole
Wt. 10.2, PV 17, YP 12, PH 10, WL 5.1, Sol 13
Drl & surv f/10,545' - 11,079' (534').
10,428', 52-1/2°, S78W, 7170 TVD, 6842 VS, 329S, 6100W
10,679', 55-1/4°, S83W, 7318 TVD, 7041VS, 3327S, 6299W
10,870', 51-1/2°, S80W, 7432 TVD, 7192 VS, 3350S, 6451W
13-3/8" @ 2571'
11,387', (308'), Drlg 12¼ hole
Wt. 10.2, PV 17, YP 12, PH 10, WL 5.1, Sol 13
Drl & surv 12¼" hole to.11,387'.
11,154', 52-3/4°, S84-1/2W, 7607 TVD, 7412 VS, 3380S, 6673W
13-3/8" @ 2571'
11,387', (0'), Prep to rn 9-5/8" csg
Wt. 10.2, PV 16, YP 9, PH --, WL 5.1, Sol 13
Circ, pmp pill, TOH, wrk pipe thru tight spots 9857'-9567',
9261' 8447' 7784' TOH to 13-3/8" shoe. PU 13 its, G-lO5 DP,
TIH, wsh & rm to btm, C&C f/csg, TOH.' Chg pipe rams, prep to rn
9-5/8" csg.
11,313', 53°, S84W, 7703 TVD, 7535 VS, 3399S, 6858W
The above is correct
Signature
For form preparation and distl~bution
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
Dale ITitle
6/05/85
Drilling Superintendent
AR3B-459-2-B
Number all daily well history forms consecutively ~Pa~e no,
as they are prepared for each well.
I
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form ~s used outing drilling or workover operations. If testing, coring, or perforat,ng, show formation name ir, describing work performed.
Number aH drill stem tests sequentially. Attach descr~¢)tion Of all cores. Work performed by Producing Section will be reported on "Interim" sheets until I[na,I
completion. Report official or representative test on "Final" form, 1} Submit "Interim" sheets when Idled out but not less IreQuently than every 30 days, or
on Wednesday of the week in wh~cll o~1 string is set. Submit weekly for workovers and following setting of oH string until complehon.
District
Field
Alaska
MacArthur River Field
ICounty or Parish IState
North Slope Borough Alaska
ILease or Unit Iwell no.
ADL #18777 I K8-RD
Date and depth
as of 8:00 a.m.
1/24/85
1/25/85
1/26/85
thru
1/28/85
1/29/85
1/30/85
1/31/85
Complete record for each day while drilling or workover in progress
9-5/8" @ 11,376'
11,387', (0'), Displ'g cmt
Wt. 10.2, PV 16, YP lO, PH 10, W-L 4.8, Sol 13
Chg pipe rams to 9-5/8". Rn 162 its, 9-5/8", 47#, L-80 BTC csg
& 118 its, 9-5/8", 47#, S-95 BTC csg &lnd w/FS @ 11,376', FC @
11,292'. M&P 750 sx Cl "G" w/12 gal D-31L, 6 gal D-12L, & 1 Gal
D-6L. Displ cmt using rig pmps w/10.2 ppg mud.
11,313', 53°, 884W, 7703.00 TVD, 7535.63 VS, 3392.92S, 6799.74W
11,387', 53°, S84W, 7747.54 TVD, 7593.19 VS, 3399.10S, 6858.52W
9-5/8" @ 11,376'
11,387', (0'), DO cmt plugs & flt colt
Wt. 10.2, PV 20, YP 13, PH 10, WL 4.8, Sol 13
Fin displ'g cmt w/812 bbls, 10.2 ppg mud w/good rtns.
plug. CIP @ 0650 hrs, 1/24/85. Chg pipe rams to 5".
w/BHA, DO cmt plugs & FC @ 11,257'.
Bump
RIH
9-5/8" @ 11,376'
11,997', (610'), Rn'g WL SS surv
Wt. 9.8, PV 15, YP 9, PH 10, WL 4.8, Sol 10
Drl & surv 8½" hole to 11,997'.
11,313', 53°, o 884W, 7703.00, 7535.63 VS, 3392.928, 6799.74W
11,559', 55-3/4 , S85W, 7846.28, 7729.96 VS, 3412.09S, 6998.76W
9-5/8" @ 11,376'
12,149', (152'), RIH w/fsh'g assy
Wt. 9."8, PV 16, YP 9, PH 10.5, WL 5.1, Sol 10
Drl & surv f/11,997'-12,149', POOH, left 2 cones in the hole.
MU Tri-State fsh'g assy, RIH.
11,932', 59°, S85W, 8047.35 TVD, 8034.61VS, 3439.468, 7311.67W
12,084', 58°, 887W, 8126.77 TVD, 8159.72 VS, 3448.50S, 7440.94W
9-5/8" @ 11,376'
12,151', (2'), Cut drl in
Wt. 9.8, PV 18, YP 12, PH 10.5, WL 4.4, Sol 10
RIH w/rev circ ink bskt, wsh over fsh, drl 2', POOH, rec'd 1
cone. MU 8" magnet & RIH, POOH; no rec'y. LD fsh'g tls. RIH
w/drlg assy & MWD.
9-5/8" @ 11,376'
12,402', (251'), POOH f/bit
Wt. 9.9, PV 15, YP i0, PH 10, WL 4.8, Sol 11
Drl & surv 8½" hole to 12,402'.
12,174', 57.6°, S89.5W, 8174.73 TVD, 8232 VS, 3450.83S, 7517.06W
The above is correct
Signature ~ Date ITitle
/~')~ ~.~.,.0..,~) 6~05~85I Drilling Superintendent
For form-pSeparation an~ ~stribud~n
see Procedures Manuai SeCtion 10,
Drilling, Pages 86 and 87
AR3B-459-2-B
Number all daily well history forms consecutively IPage no.
as they are prepared for each well. [ '~.0
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form ~s used during arHHng or workover olaerations, if testing, coring. Or perlorating, show formation name in describing work performed.
Number a;I drdl stem tests sequemiaily. Altacn descrlphOn of alt cores Work performed by Producing Section will be reported on "Interim" sheets unHI lif~at
completion. Report otfic~al or representative test on "Final" form. 1) Submit "Interim" sheets when hlled out bul not less frequently than every 30 days, or (2')
on Wednesday of the week in whlcI1 oi[ string is set. Submit weekly for workovers and ~ollowlng setting of od strln§ until completion.
District
Alaska
I County or Parish
Field
MacArthur River Field I iLease
or
Unit
Date and depth Complete record for each day while drilling or workover in progress
as of 8:00 a.m.
North Slope Borough
ADL #18777
State
Alaska
JWell no.
2/Ol/85
2/02/85
thru
2/04/85
2/05/85
2/06/85
2/07/85
2/08/85
9-5/8" @ 11,376'
12,528', (126'), Drlg ahead
Wt. 9.8, PV 15, YP 10, PH 10, WL 4.6, Sol 11
POOH. RIH w/bit, wsh 60' to btm, drl 8½" hole to 12,528'.
12,314', 55-1/2°, S89W, 8251.89, 8343.28, 3452.36, 7633.86
9-5/8" @ 11,376'
13,303', (775'), Drlg ahead
Wt. 9.8, PV 15, YP 10, PH 10, WL 4.8, Sol 10
Drl & surv 8½" hole f/12,528'-13,303'.
12,507', 52°, N89W, 8366, 8490.32, 3452.36N, 7789.47W
12,979', 49.50°, N83.67W, 8657.36, 8835.92, 3437.53S, 8160.33W
13,124', 47°, N83W, 8753.90, 8933.34, 3424.98S, 8267.77W
9-5/8" @ 11,376'
13,472', (169'), Drlg ahead
Wt. 9.8, PV 20, YP 10, PH 10, WL 4.4, Sol 10
Drl 8½" hole to 13,342', short trip to 9-5/8" csg shoe. Drl &
surv to 13,472'.
13,245', 45-3/4°, N83W, 8837.39, 9011.99, 3414.31S, 8354.71W
9-5/8" @ 11,376'
13,678', (206'), Chg bit & BHA
Wt. 9.8, PV 17, YP 11, PH 10, WL 4.4, Sol 10
Drl & surv 8½" hole to 13,678'.
13,452', 45-3/4°, N83.69W, 8981.88, 9145.54, 3397.12S, 8501.98W
13,578', 44.53°, N82.78W, 9070.70, 9225.90, 3386.60S, 8590.67W
9-5/8" @ 11,376'
13,843', (165'), POOH f/bit chg
Wt. 9.8, PV 16, YP 8, PH 10, WL 4.2, Sol 9
Drl & surv 8½" hole to 13,843'.
13,729', 43.1°, NSl-1/4°W, 9179.66, 9318.98, 3372.09S, 8694.19W
13,761', 42.53°, N80W, 9203.13, 9338.09, 3368.55S, 8715.65W
9-5/8" @ 11,376'
14,008', (165'), Drlg
Wt. 9.8, PV 20, YP 11, PH 10, WL 4.4, Sol 10
RIH, wsh & rm 13,783'-13,843', drl 8½" hole to 14,008'.
13,792', 42.0°, N80.7W, 9226.07, 9356.37, 3365.05S, 8736.2OW
13,919', 43.38°, N76.9W, 9319.42, 9430.70, 3348.33S, 8820.66W
The above is correct
Signature
For form preparation and' di~'ribulion
see Procedures Manual Sect~fon 10,
Drilling, Pages 86 and 87
AR3B-459-2-B
Date
Number all daily well history forms consecutively
as hey are prepared for each well.
ARCO Oil and Gas Company "~'v
Daily Well History--Interim
Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work Oerformed.
Number ail drill stem tesls sequentially. Attach descripl[on of all cores. Work perlormed by Producing Section will be reported on "interim" sheets until finer
cemplehon. Report olficla~ or represen~alive test on "Final" form. 11 Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2)
on Wednesday el the week in which oil string is set, Submit weekly for workovers and following setting of oil strin(~ until completion.
District
Field
Date and depth
as el 8:00 a.m.
I County or Parish
Alaska North Slope Borough
Lease or Unit
MacArthur River Field ADL ~t18777
Complete record for each day while drilling or workover in progress
2/09/85
thru
2/11/85
2/12/85
2/13/85
2/14/85
IState
Alaska
Well no.
9-5/8" @ 11,376'
14,307', (299'), RIH
Wt. 9.8, PV 20, YP 15, PH 9.5, WL 4.2, Sol 9
Drl & surv 8½" hole to 14,307', pipe parted @ ±405', POH, pin
thread pulled. LD same. RIH w/fsh'g assy, screw into fsh, PU
drl string; pipe parted @ 409', POH. RIH w/fsh'g assy, tag TOF
@ 412', circ w/good rtns; no pipe movement, started loosing pmp
press, POH. RU APRS string shot, RIH; tag obstruction @ 465',
POOH. RIH w/spud tl assy, stopped @ 465' (suspect piece of
grapple inside DP), POOH. RIH w/APR string shot tl assy, fire
string shot & BO tl Jt @ 475', POOH w/WL string shot tl & fsh'g
assy #3. RIH w/OEDP, tag TOF @ 475', screw into fsh, wrk pipe;
no movement, POH. RIH w/chisel tl assy, tag obstruction @ 566'
WLM, spud tl to 4250', POOH. RIH w/APRS string shot tl assy to
4250', log up to 4225', BO @ fsh tl assy, POOH. RIH w/fsh'g
assy #5, tag TOF @ 405', screw into fsh, PU & rotate OS off
shot, POOH.
13,982', 44.18°, N81W, 9364.91, 9468.42, 3340.04S, 8863.44W
14,044', 44.47°, N79W, 9409.26, 9506.33, 3332.64S, 8906.12W
14,116', 44.34°, N83W, 9460.70, 9550.79, 3324.818, 8955.88W
9-5/8" @ 11,376'
14,307', (0'), Wrk pipe & pmp pill
Wt. 9.8, PV 15, YP 11, PH 10, WL 4.4, Sol 9
RIH w/fsh'g assy #6, wrk bowl grapple over fsh, circ slowly
w/good rtns, break kelly, RU APRS, RIH w/string shot, fire BO
shot @ 4198', POOH w/fsh'g assy & fsh stub. Est TOF @ ±4239'.
RIH w/5" OEDP, tag TOF, est circ, wrk pipe; no pipe movement.
Mx & spot 35 bbls SFT pill & wrk pipe.
9-5/8" @ 11,376'
14,307', (0'), RU APRS
Wt. 9.8, PV 16, YP 10, PH 10, WL 4.5, Sol 10
Wrk pipe & pmp out pill every 1/2 - 1 hr; no movement.
RU APRS.
9-5/8" @ 11,376'
14,307', (0'), PU fsh'g assy
Wt. 9.8, PV 14, YP 9, PH 10, WL 4.6, Sol 10
RU APRS. RIH w/ 1-11/16" chisel point spud tl assy, tag up @ '
14,009' WLM (top of jars). RIH w/freept, tag up @ 12,990' WLM
(2 jts into HWDP). Log w/freept; 60% free @ 11,300' WLM, 10%
free @ 12,990' WLM, POOH. RIH w/string shot, wrk left hand
torque, BO @ 12,749' WLM, POOH w/WL. POOH w/DP & LD 21 its bent
DP. MU fsh'g BHA.
The above is correct
For form preparation and'distribution
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
Date ITitle
6/05/85
Drilling Superintendent
AR3B-459-2~B
Number all daily well history forms consecutively
as they are prepared for each well.
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form is used durrng drdl[ng or workover operations. If testing. COring, or perforating, show formation name in describing work performed,
Number all drill slem tests sequenlially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until fin;al
complebon, Report official or representabve test on "Final" form. 1) Submit "Interim" sheets when hlled out but not less lrequentty than every 30 days, or (2)
on Wednesday bi the week in which oll string is set. Submit weel(ty lot workovers and Iollowing setting of od strinG until complel~on,
District
Field
Date and depth
as of 8:00 a.m.
J County or Parish
Alaska North Slope Borough
I Leaso or Unit
MacArthur River Field ADL ¢t18777
Complete record for each day while drilling or workover in progress
2/15/85
2/16/85
thru
2/19/85
2/20/85
2/21/85
2/22/85
IState
Alaska
Well no.
K8-KD
9-5/8" @ 11,376'
14,307', (0'), RIH w/bit
Wt. 9.8, PV 18, YP 11, PH i0, WL 4.5, Sol 10
RIH w/fsh'g assy, screw into fsh, rotate free, POH; full rec'y.
MU BHA, RIH to cond f/logs.
9-5/8" @ 11,376'
14,351', (44'), POOH w/SOS
Wt. 9.8, PV 15, YP 9, PH 10, WL 4.4, Sol 10
RIH, rm & drl to 14,351' DPM. Cond hole, POOH. RU loggers, RIH
w/DIL/SP/BHCS/GR, tag up @ 11,963' WLM on 3 att's; RD loggers.
MU CO assy, RIH, cond hole, POOH; dropped std of DC's in hole.
RIH w/fsh'g assy, POOH w/fsh. RU loggers, RIH.w/DIL/SP/BHCS/GR,
tag up @ 11,965' WLM, RD loggers. MU rm'g assy, RIH, rm
f/11,833'-12,153'. RIH to 14,351', C&C, POOH. RU loggers, RIH
w/DIL/SP/BHCS/GR, tag up @ 11,965' WLM.
9-5/8" @ 11,376'
14,388', (37'), POOH w/bit
Wt. 9.8, PV 16, YP 9, PH 10, WL 4.2, Sol 8
POOH w/logs. RIH w/CO assy, C&C. RIH w/GR inside DP
f/14,310'-11,300', RD loggers. Drl f/14,351'-14,388', POOH.
9-5/8" @ 11,376'
14,388', (0'), Wrk'g pipe in tight spot @ 14,360'
Wt. 9.8, PV 20, YP 9, PH 10, WL 3.9, Sol 8
POOH f/logs. Rn DIL/SP/BHCS/GR, tag up @ 11,965' WLM, POOH, RD
WL. PU bit & BHA, RIH, wsh & rm to 14,360' DPM.
14,264', 48-1/4°, NSl-1/4W, 9562.97, 9646.45, 3310.078, 9061.80W
9-5/8" @ 11,376'
14,388', (0'), RIH w/string shot tl assy
Wt. 9.8, PV 20, YP 10, PH 9.5, WL 3.8, Sol 9
Cont wrk'g pipe; DP parted w/TOF @ ±10' below rotary table. Rn
string shot, fired shot @ 4204', POOH; rec'd partial fsh. PU
kelly & 2 pup its, RIH, tag TOF @ 4204', screw DP pin into box,
wrk pipe; no movement, set Kelly back. RU WL, rn freept tl to
11,330'; att several times to rn FP tl thru 11,980' w/o success,
POOH. PU string shot, RIH.
The above is correct
Signature
For form preparation and distrib~llon
see Procedures Manual Section 1'0,
Drilling, Pages 86 and 87
IDate ITitle
6105185
Drilling Superintendent
AR3B-459-2-B
Number all daily well history forms consecutively
as they are prepared for each well.
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form is used during drilling or workover operations, If testing, coring, or perforating, show formation name in describing work performed.
Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Seclion wdl be reported on "Interim" sheets until final
complehon. Report olficial or representative test on "Final" form. 1] Submit "Interim" sheets when Idled out but not less ¢requently Ihan every 30 days. or (2)
on Wednesday of the week in which oil string iS set. Submit weekly for workovers and tollowing selling of Od string until completion.
Dislricl
Field
Alaska
County or Parish IState
North Slope Borough Alaska
ILease or Unit Well no.
ADL #18777 K8-RD
MacArthur River Field
Date and depth
as of 8:00 a,m.
2/23/85
thru
2/25/85
2/26/85
2/27/85
2/28/85
3/01/85
Complete record for each day while drilling or workover in progress
9-5/8" @ 11,376'
14,388', (0'), LD fsh'g assy #6
Wt. 9.8, PV 20, YP 12, PH 10, WL 3.6, Sol 8
RIH w/string shot, fired shot @ 11,316', POOH & LD SS tl, POOH
w/5" OEDP. Tst BOPE to 250//3000 psi. RIH w/fsh'g assy #2, tag
TOF @ 11,298' DPM, screw into fsh, wrk pipe & Jar on fsh, POOH,
rec'd partial fsh. TIH w/fsh'g assy #3, att to rotate OS over
fsh w/o success, POOH. TIH'w/fsh'g assy #4, rotate knuckle jt
assy f/11,972'-11,985' w/pmp on & att to kick fsh stub in
vertical position w/o success, POH. TIH w/fsh'g assy #5 & APRS
colr locater tl assy, att to rn CL tl thru knuckle Jt w/o
success, TOH, RD APRS, WL & fsh'g assy #5. TIH w/fsh'g assy #6,
rotate & rm w/TSA multi-string cutter assy f/11,970'-11,979',
TOH w/fsh'g'assy #6.
9-5/8" @ 11,376'
14,388', (0'), POOH w/fsh assy #8
Wt. 9.8, PV 18, YP 8, PH 10, WL 3.8, Sol 8
LD FTA #6. PU FTA #7 - OS assy, RIH, att to wrk over fsh, PooH.
PU FTA #8 - outside cutter assy. RIH, wrk cutter over fsh. Cut
stub @ 11,986', POOH.
9-5/8" @ 11,376'
14,388', (0'), POOH w/fab assy #9
Wt. 9.8, PV 13, YP 8, PH 10, WL 3.8, Sol 10
POOH w/fsh'g assy #8; no rec'y. RIH w/FTA #9 - cripple
shoe/OS/grapple. Att to WO fsh w/o success, POOH.
9-5/8" @ 11,376'
14,388', (0'), POOH w/rah assy #9
Wt. 9.8, PV 13, YP 8, ?H 10, WL 3.8, Sol 10
POOH w/fsh'g assy #8; no rec'y. RIH w/FTA #9 - cripple
shoe/OS/grapple. Att to WO fsh w/o success, POOH.
9-5/8" @ 11,376'
14,388', (0'), Jarring on fsh
Wt. 9.8, PV 16, YP 9, PH 12, WL 3.9, Sol 10
Spot cmt plug w/400 sx C1 "G" w/18 gal/lO0 sx D-31L; pipe stuck
& hole packed off while displ'g cml. Regain circ, wrk pipe. RU
APRS, RIH w/freept; pipe free @ 11,400', stuck @ 11,600', POOH,
circ & wrk pipe. RIH w/SS, backed pipe off @ 11,331', POOH
w/APRS & RD. RIH w/fsh'g assy, tag TOF @ screw into same @
11,331' Jar on fsh.
The above is correct
Signature
For form preparation and dis~'ibution
see Procedures Manual Secti'bn 10,
Drilling, Pages 86 and 87
Date ITitle
3/01/85
Drilling Superintendent
AR3B-459-2-B
Number all dally well history forms consecutively
as hey are prepared for each well.
IPa~e5no.
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form is used during drdling or workover operations. If testing, coring, or perforating, show Iormation name in describing work performec$.
Number a;I ts. II stem tests sequentially. Attach (3escriphon of all cores. Work performed by Proclucing Section will be reported on "lnlerim" sheets until final
completion. Report olficial or representative test on "Final" form. ~[) Submit "Interim" sheets when hlled out but not less frequently than every 30 clays, or
on Wednesday of Ihe week in which oil string is set. Submit weekly for workovers and following selhng ol oil strinG until completion.
District
Field
Date and depth
as of 8:00 a,m,
I ,County or Parish
Alaska North Slope Borough
Lease or Unit
MacArthur River Field ADL #18777
Complete record for each day while drilling or wprkover in progress
3/02/85
thru
3/04/85
3/05/85
3/06/85
3/07/85
3/08/85
3/09/85
3/10/85
thru
3/11/85
3/12/85
ISlate
Alaska
Well no.
K8-t~D
9-5/8" @ 11,376'
Drlg firm cmt @ 11,190'
Wt. 9.8, PV 14, YP 9, PH 12, WL 4.5, Sol 10
Jar on fsh. Rn freept; pipe stuck @ 11,600'. Jar on fsh. Rn
freept; no chg. Rn string shot, BO @ 11,488' WLM. Strap out of
hole; TOF @ 11,463'. Spot 150 sx cmt plug @ 11,463'. RIH to
9931', WOC, fin RIH w/bit to 11,445'; no cmC, POOH. RIH w/OEDP
to 11,463', spot 250 sx cmt plug, POOH. RIH w/bit to 11,004',
tag cmt, CO cmt f/11,045'-11,190'.
9-5/8" @ 11,376'
RIH w/bit
Wt. 9.8, PV 13, YP 8, PH 12, WL 5.2, Sol 10
CO cmt to 11,294', POOH. RU WL, rn DiaLog caliper log
f/ll,220'-surf, RD WL. RU APRS, rn gyro f/8OO0'-surf, RD WL.
RIH w/bit to LD DP.
9-5/8" @ 11,376'
Tst BOPE
Wt. 9.8, PV 13, YP 8, PH 13, WL 5.3, Sol i0
TIH w/DP, tst csg to 2700 psi, POOH, LD DP. Wrk on BOPE & tst.
9-5/8" @ 11,376'
11,294' TOC, Rig repair
Wt. 9.8, PV 13, YP 8, PH 13, WL 5.3, Sol 10
Tst BOPE. PU HWDP, std back in derrick. Cln, paint & repair
rig. ~
9-5/8" @ 11,376'
11,294' TOC, Rig repair
Wt. 9.8, PV 173, YP 8, PH 13, WL 5.2, Sol 10
Offload DP f/boat. PU "E" DP & std back in derrick.
9-5/8" @ 11,376'
11,294' TOC, Operations tamp suspended
Wt. 9.8, Vis 42
RD, leave BOPE on. Temporarily suspend operations~ wait on
co-owner approval.
9-5/8" @ 11,376'
11,294' TOC, Operations tamp suspended
RD, leave BOPE on. Operations temporarily suspended.
9-5/8" @ 11,376'
11,294' TOC, Operations tamp suspended
Wt. 9.8, Vis 42
Wait on co-owner AFE approval.
The above Is correct
Drilling, Pages 86 and 87
6/05/85 Title
Drilling Superintendent
AR3B-459-2-B
Number all daily well history forms consecutively
as they are prepared for each well.
JPagie7no.
ARCO Oil and Gas Company
Daily Well History--Interim
Instructons: This form S used durng dr,l[ing or workover operations. If testing, coring, or perforating, show tormahon name in describing work performed.
Number a;l drill stem tests sequentially Attacf~ descrip.on ot all cores. Work performed by Producing Sec on will be reported on "Interim"' sheets unt,I fi.al
completion. Report olhcial or representative ,.est on "FIn&l" form. 1} Submit "Interim" sheets when tilled out but not less frequently than every 30 days. or (2)
on WedneSday of the week in which od string is set, Submit weekly lot workovers and follow ng sett ng of o String unlil completion.
District ICounty or Parish IState
Alaska I North Slope Borough I
Field Lease or Unit
MacArthur River Field ADL #18777
Complete record for each day while drilling or workover in progress
Date and depth
as of 8:00 a.m,
3/13/85
3/14/85
3/29/85
thru
4101185
4/02/85
4/03/85
4/04/85
4/05/85
thru
4/08/85
Alaska
no.
K8-RD
9-5/8" @ 11,376'
11,294' TOC, ND BOPE
Wt. 9.8, Vis 42
Skid rig & RU. RIH w/DC's & DP in derrick, POOH, LD DP.
BOPE.
9-5/8" @ 11,376'
11,294' TOC, RR
Wt. 9.8, Vis 42
ND BO?E, NU tree. RR @ 0930 hrs, 3/13/85.
9-5/8" @ 11,376'
11,390', RIH w/DD
Wt. 9.8, PV 18, YP 9, PH 12.5, WL 5.3, Sol 9
Accept ri~ @ 0900 hfs, 3/29/85. ND tree, NU & tst BOPE. PU new
DP, break & MU. RIH. CO cmt to 11,390', POOH. RIH w/sidetrack
assy.
9-5/8" @ 11,376'
11,460', POOH
Wt. 9.8, PV 17, YP 10, PH 13.2, WL 5.1, Sol 10
RIH w/sidetrack assy, DD f/11,370'-11,430' No cmt
f/11,430'-11,460'. Tag fsh @ 11,460', POOH.
9-5/8" @ 11,376'
11,460', RIH w/bit
Wt. 9.8, PV 21, YP 9, PH 13, WL 5.4, Sol 8
POOH. LD DD assy. RIH w/OEDP to 11,460', RU cmtrs. Mx & spot
a 200 sx cmt plug, POOH. RIH w/bit.
9-5/8" @ 11,376'
11,386' PBTD, PU BHA
Wt. 9.7, PV 14, YP 6, PH 13, WL 5.8, Sol 8
RIH w/CO assy, tag cmt @ 11,130'. Drl soft cmt to 11,157', WOC.
Drl firm cmt to 11,386', POOH. PU sidetrack assy.
9-5/8" @ 11,376'
12,125', (407'), RIH
Wt. 9.8, PV 17, YP 10, PH 11.5, WL 5.6, Sol 7
RIH, sidetrack @ 11,384'. Drl & surv 8½" hole to 12,125'.
11,415', 52-1/2°, S87-1/2W, 7750 TVD
11,386', 53°, S84W
11,415', 52-1/2°, S87-1/2W
11,387', 53°, S84W
12,000', 50.4°, N86.78W, 8127.43, 8050.90, 3410.71S, 7338.89W
12,030', 49.7°, N85.6W, 8146.64, 8072.14, 3409.18S, 7361.88W
The above is correct
Signature
For forr~ preparat[o~ ar~ distribution
see Procedures Manual/Section 10,
Drilling, Pages 86 and 87
IDate Title
6/05/85
Drilling Superintendent
AR3B-459-2-B
Number all daily well history forms consecutively Pe~.e6no
as hey are prepared for each well,
ARCO Oil and Gas Company ,~,
Daily Well History--Interim
Inslructiona: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performecl,
Number a;I drill stem tests sequentially. Attach clescriptlon OI all cores. Work performed by Producing Section will be reported on "Interim" sheets until finial
completion. Report official or representative test on "Final" form, 1} Submit "Interim" sheets when filled out but not less frequently Ihan every 30 days. or (2)
on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion.
District
Alaska
ICounty or Parish
Field
MacArthur River FieldI iLease
or
Unit
Date and depth Complete record for each day white drilling or workover in progress
as of 8:00 a.m.
North Slope BorouKh
ADL #18777
IState
Alaska
IWoII no.
I KS-RD
4/09/85
4/10/85
4/11/85
4112185
4/13/85
thru
4115185
4/16/85
9-5/8" @ 11,376'
12,328', (203'), Drlg
Wt. 9.8, PV 18, YP 10, PH 11.5, WL 5.0, Sol 8
Drl & surv 8~" hole f/12,125'-12,254'. Repair rotary table.
Drl & surv f/12,254'-12,328'.
12,150', 48.42°, N84.97W, 8225.06, 8155.24, 3401.71S, 7452.40W
12,224', 48.31°, N85.7W, 8274.22, 8205.86, 3397.22S, 7507.52W
9-5/8" @ 11,376' 12,388', (60'), Drlg
Wt. 9.8, PV 19, YP 10, PH 11.5, WL 5.0, Sol 9
Drl 8½" hole to 12,388'.
9-5/8" @ 11,376'
12,500', (112'), POOH, lk'g f/press loss
Wt. 9.8, PV 19, YP 11, PH 11.5, WL 4.7, Sol 9
Drl & surv 8½" hole to 12,500', POOH f/bit chg, RIH, lost 2000#
press, POOH.
12,385', 45.70°, N82.99W, 8383.35, 8303.02, 3354.59S, 7625.11W
12,447', 47.08°, N82.24W, 8426.26, 8342.82, 3348.28S, 7669.41W
9-5/8" @ 11,376'
12,800', (300'), POOH
Wt. 9.8, PV 15, YP 10, PH 11.5, WL 4.7, Sol 9
POOH, 1 nozzle out. Redress bit, RIH, drl & surv
f/12,500'-12,800'.
12,537', 48.07°, N83.27W, 8486.98, 8402.35, 3339.90, 7735.32
12,755', 46.36°, NSO.09W, 8635.19, 8544.23, 3316.75, 7893.47
9-5/8" @ 11,376'
12,320', (220'), RIH
Wt. 9.8, PV 18, YP 10, PH 11.5, WL 4.8, Sol 9
POOH, repair rotary. TIH, drl & surv 12,800'-13,020', POOH
f/bit. RIH.
12,853', 46.61°, N79.22W, 8702.67, 8606.12, 3303.99S, 7963.39W
12,947', 47.98°, N80.72W, 8766.42, 8666.45, 3291.96S, 8031.40W
9-5/8" @ 11,376'
13,149', (129'), RIH
Wt. 9.8, PV 22, YP 13, PH 11.5, WL 4.6, Sol 9
Drl & surv 8½" hole f/13,020'-13,149'.
12,999', 48.66°, N77.54W, 8801.00, 8700.09VS, 3284.64S, 8069.54W
The above is correct
Signature
For form preparation and~distribution
see Procedures Manual Section 10.
Drilling, Pages 86 and 87
IOate ITltle
6~05~85
Drillin~ Superintendent
AR3B-459-2-B
L Number all daily well history forms consecutively
as they are prepared for each well.
IPa~.eTn°
ARCO Oil and Gas Company
Daily Well History--Interim
Instruclions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed.
Number all drill stem tests sequenlially. Attach description of all cores. Work berformed by Producing Section will be reported on "Interim" Sheets un~il hnal
completion. Report oHicial or representative test on "Final" form. 11 Submit "Interim" sheets when hi]ed out but not less frequently than every 30 days. or (2)
on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting pi oll strin§ until completion.
District
Field
Date and depth
as of 8:00 a.m.
I County or Parish
Alaska North Slope Borough
I Leaso or Unit
MacArthur River Field ADL #18777
Complete record for each day while drilling or workover in progress
4/18/85
4/17/85
4/19/85
4/20/85
thru
4/22/85
4/23/85
4/24/85
4/25/85
4/26/85
IState
Alaska
IWell no.
9-5/8" @ 11,376'
13,413', (264'),
Wt. 9.8, PV 18, YP 9, PH 11.5, WL 4.4, Sol 9
Drl & surv 8½" hole f/13,149'-13,413'.
13,277', 46.75°, N75.5W, 8988.07, 8873.35VS, 3236.71S, 8269.49W
9-5/8" @ 11,376'
13,702', (289'), POOH
Wt. 9.8, PV 20, YP 10, PH 11, WL 4.2, Sol 9
RIH, wsh 12,977'-13,019' & 13,225'-13,413'. Drl 8½" hole to
13,702', POH f/bit chg.
13,490', 46.52°, N74.8W, 9134.35, 9001.80, 3197.02S, 8419.16W
13,641', 46.40°, N73-3/4W, 9238.34, 9091.66, 3167.365, 8524.53W
9-5/8" @ 11,376'
13,887', (185'), Drlg
Wt. 9.8, PV 17, YP 10, PH 10.5, WL 4.8, Sol 9
Drl & surv f/13,702'-13,887'.
9-5/8" @ 11,376'
14,373', (486'), RIH
Wt. 9.8, PV 17, YP 8, PH 10.5, WL 4.5, Sol 10
Drl & surv f/13,887'-14,373', C&C hole f/logs, POH.
9-5/8" @ 11,376'
14,373', (0'), Logging
Wt. 9.8, PV 20, YP 10, PH 10, WL 4.1, Sol 10
POOH. RU loggers. Rn DIL/SP/BHCS/GR f/14,357'-11,347'. Rn'g
log #2, LDT/CNL/GR/CAL.
14,339', 44.0°, N73.75W, 9732.68 (SS)
9-5/8" @ 11,376'
14,548', (175'), C&C
Wt. 9.8, PV 16, YP 10, PH 10, WL 4.4, Sol 9
Rn Log #2, LDT/CNL/GR/CAL f/14,357'-11,325'
drl add'l 200'±. Drl f/14,373'-14,548', C&C.
9-5/8" @ 11,376'
14,548', (0'), POH w/SOS
Wt. 9.8, PV 17, YP 11, ?H 10, WL 4.4, Sol 9
POOH f/logs, hit tight spots @ 12,348' & 11,890'. Att to rn
DIL/SP/BHCS/GR; could not get below 11,884', POOH w/logs.
9-5/8" @ 11,376'
14,548', (0'), POOH
Wt. 9.9, PV 20, YP 13, PH 10.5, WL 4.4, Sol 9
RIH w/bit, C&C f/lnr. Rm tight spots on trip out, POOH.
RIH w/drlg assy to
The above is correct
Signature
For for~ ~eparatlon ~nd/~istr[butlon
see Procedures Manual S~ction 10.
Drilling, Pages 86 and 87
AR3B-459-2-B
IDate ITitle
6/05/85
Drilling Superintendent
· .. ," 1""~5
~"":~ ~ .~ ...>.,, ...:~. -.;7 'i....':-"; ~:~ i'
"-;" .. . · ~ .... . ~ '..;
INumber all daily well history ~orms consecutively
as they are prebared for each well.
ARCO Oil and Gas Company
Daily Well History--Interim
nstructions: This form is used during drilling or workover operations. Il testing, coring, or perforating, show formation name in descrlbinq work perlormed,
Number all drill stem lests sequentially. Attach description of al cores. Work performed by Producing Section wilt be reported on "Interim'" sheets until flnat
complehon. Report olfic~al or representative test on "Final" form, 1 Submit "Interim" sheets when filled out bu! not tess trequently Ihan eve,'y 30 days, or (2)
on Wednesday Of the week in which OH string is set. Submit weekly for workovers and follow ng se ~ng o oH strln§ unlil completion.
District
ICounty or Parish JState
North Slope Borough
ILease or Unit ADL #18777
Field
Alaska
MacArthur River Field
Alaska
Well no.
K8-RD
Date and deptl~
as of 8:00 a.m.
4/27/85
thru
4/29/85
4/30/85
5/ol/85
5/02/85
5/03/85
The above is correct
Complete record for each day while drilling or workover in progress
7" @ 14,546'
14,548', (0'), RIH w/bit & scrpr
Wt. 9.9, PV 20, YP 10, PH 10.5, WL 5, Sol 10
POOH. Rn 63 jts, 7" 29# & 23 its, 7" 32" S-125 BTC lnr
f/10,908'-14,546' MD w/FC @ 14,507', FS @ 14,544'. Cmt w/lO50
sx C1 "G" w/D-45L, D-31L, R-12L, D-6L & 6% KCl. Annulus packed
off last 15 bbls of displm't. POOH. RIH w/CO assy, no cmt
control. Tst lap to 3000 psi, bled to 2600 psi/20 min &
dropping. RIH w/sqz assy. Est IR of 1/8 BPM/4200 psi. Spot
100 sx cmt. POOH 6 stds. Set pkr. Sqz 60 sx @ 4800 psi.
POOH. RIH w/9-5/8" CO assy.
7" @ 14,546'
14,548', (0'), Drlg cmt'
Wt. 9.8, PV 18, YP 10, PH 11.5, WL 5, Sol 10
RIH, CO cmt on TOL. Tst lap to 3000 psi; OK, POOH. RIH w/7" CO
assy. CO 60' cmt in TOL. Tag cmt @ 14,192', CO to 14,526' DPM.
7" @ 14,546'
14,548', (0'), Tst lnr lap
8.8 ppg Brine
Drl hard cmt f/14,232'-14,524', tst csg to 3000 psi. Displ mud
w/FIW, circ, wt wtr up to 8.8 ppg binre. Tst csg to 3000 psi.
7" @ 14,546'
14,524', (0'), PU CET assy
8.8 ppg Brine
Fin tst 9-5/8" csg, 7" lnr & lnr lap & cmt to 3000 psi. Circ,
spot 25 bbls BridgeSal pill f/14,524'-13,850', POOH w/bit & 7"
csg scrpr. RU Schl, rn CBL/CNL/CCL/GR f/14,530'-10,800' WLM.
Rn CBL f/14,530'-10,800' WLM. Rn GCT gyro f/14,500' - surf,
POOH & LD gyro tl assy.
7" @ 14,546'
14,524', (0'), Prep to PU 3%" tbg tailpipe
8.8 ppg Brine
Rn CET log f/14,530'-10,850' under static conditions. Log CET
f/14,530'-13,650' under dynamic conditions, POOH to TOL @
10,900', cont POOH while rn'g Caliper log f/7100'-6600',
3500'-3000', 2800'-2600', 1900'-1600' & 800'-300', POOH. RIH
w/Howco tst tl assy, set RTTS @ 10,830', open tl, perform WSO
tst, close tst tl & POOH. RU Schl, perf w/4", 4 SPF, 90°
phasing f/14,316'-14,320', POOH, RD Schl.
Signature
For form preparation anti, distribution
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
IDate Title
6/05/85
Drilling Superintendent
AR3B-459-2-B
Number all daily well history forms consecutively
as hey are prepared for each well.
Pa?gn°'
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form is used during drilling or workover operations, If testing, coring, or perforating, show formation name ;n describing work performeci,
Number a;I drdl stem tests sequentially. Attach ~escriphon of all cores. Work performed by Producing Section will be reported on "Interim- sheets until final
completion. Report oHicia~ or represenlative test on "Final" form. 1} Submit "Interim" sheets when filled out but not less lrequently than every 30 days. or
on Wednesday of the week in which oil string is set. Submit weekty for workovers and following setting of od string until completion.
District
Field
Alaska
MacArthur River Field
County or Parish
Lease or Unit
North Slope Borough
ADL #18777
State
Alaska
IWell no.
KS-t~D
Date and depth
as of 8:00 a.m.
5~O4~85
thru
5~06~85
5/07/85
5/08/85
5/09/85
Complete record for each day while drilling or workover in progress
7" @ 14,546'
14,524', (0'), Tst tbg string
8.8 ppg Brine
RIH w/sqz assy, rev out BridgeSal pill. Set pkr @ 13,800'. Att
to est IR - no leak-off. Spot BridgeSal pill on btm, POOH.
MIRU WL unit. Rn gage ring/JB to 14,450' WLM. RIH w/5½", 10'
perf gun. Perf 14,340'-14,350' w/12 SPF, 30° phasing. PU 20'
gun, RIH; could not get past 11,395', POOH. PU 4" gun, RIH,
perf 14,320'-14,340' w/8 SPF, 90° phasing (2 ms). RIH, set
isolation pkr/TP @ 14,295'. RD WL unit. RIH w/3½" DP, POOH, LD
DP. Rn 4½" x 3½" CA w/TP @ 13,604', Pkr @ 13,553', SSSV @ 257'
(6, 3½" GLM's & 5, 4½" GLM's). ND BOPE. NU tree. MIRU S/L
unit, set std'g vlv in TP. Set pkr. Prep to tst tbg.
7" @ 14,546'
14,524', (0'), RD WL equip
8.8 ppg Brine
Press tst tbg string to 3000 psi. Tst SSSV; OK. Equalize SSSV
sys. RIH w/JDC pulling tl assy to 13,624', att to pull std'g
vlv w/o success. PU 2.75" impression block, RIH, tag up @
14,546' WLM, POOH; slight impression. RD Camco WL.
7" @ 14,546'
14,524', (0'), Suspend Operations
RD S/L unit. RU Schl, rn 1-11/16" GR/CCL to 14,505' WLM, POOH,
RD WL unit. Turn well over to Production f/unloadin~ @ 2400
hrs, 5/7/85.
7" @ 14546'
14,524', (0'), Unloading well
Lift & unload well. Well stopped lifting fluid @ 1430 hrs. RU
WL unit. RIH to re-perf f/14,320'-14,340' WLM; unable to wrk
thru isolation pkr @ 14,295', POOH, LD decentralizer. RIH
w/perf gun.
The above is correct
Signature
For form preparation and distributioj~
see Procedures Manual Section 10, v
Drilling, Pages 86 and 87
IDate Title
6/05/85
Drilling Superintendent
AR3B-459-2-B
Number all daily well history forms consecutively
as they are prepared for each well.
Pa?on°'
ARCO Oil and Gas Company
Daily Well History-Final Report
Instructions: Prepare and submit '.he "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned. or Sold.
"Final Report" should ~,e submitted3 also when operations are suspended for an mdehnlte or a.opreoiable length of lime. On workovers when an otficial lest is not
required upon completion, report completion and representative test data, in blocks prowded. The "Final Report" form may be used for reporhng the entire
operahon H soace ~s available.
Accounting cost center code
District County or Parish State
Alaska Lease North Slope Borough Alaska
Field or Unif 1 Well no.
MacArthur River Field ADL #18777 I KS-RD
Auth. or W.O. no. T t e
AFE 495964 Redrill
ARCO Parker Rig #58 API 50-733-20097-01
Operator I A.R.Co. W.I.
ARCO Alaska, Inc. 12%
Spudded or W.O. begun ~Date
Workover I l 1 / 12 / 84
Date and depth 'Complete record for each day reported
as of 8:00 a.m.
5110185
Iotal number of wells (active or inactive) on this
ost center prior to plugging and ~
bandonment of this well
I
our I Prior statue if a W.O.
I
0600 Hrs.
7" @ 14546'
14,524', (0'), Perf'g
Pmp 190 bbls frsh wtr dn tbg to free gun, POOH w/gun. RIH
w/2.25" impression block thru isolation pkr to 14,513' WLM,
POOH. RIH w/2-1/8" pert gun. Report well f/14,320'-14,340'.
Lift well @ 1008 BFPD. RR @ 1500 hfs, 5/10/85. (NOTE: Perf'g
will cont w/derrick over hole.)
Old TD New TD
14,524' (4/24/85)
Released rig
1500 Hrs.
Date
PB Depth
K nd of r g
5/10/85 Rotary
Classifications (oil, gas, etc.)
Oil
Type completion (single, duel, etc,)
Single
Producing method Official reservoir name(s)
Flowing MacAr thur River
Potential test data
Well no, Date Reservoir Producing Interval Oil or gasTest time Production
Oil on test Gas per day
Pump size, SPM X length Choke size T.P, C,P, Water % GOR Gravity Allowable Effective date
corrected
The above is correct
6/05/85
For form preparation and {~istribution,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87,
Drilling Superintendent
AR3B-459-3-C
Number all daily well history forms consecutively
as hey are prepared for each we .
Page no.
21
D vision of At antlcRIchf eldCompan,
ARCO ALASKA~ INC.
LEG 47 SI_OT NO: 25~ WELL_ NO: K-SRD TELECO
KING SALMON PLTFM~ COOK INLET, ALASKA
TELECO Mwd, 6?05-14264 MD~ DIRECTIONAL DRILLER: HAROLD BROWN
VERTIE:AL SECTION CALCULATED IN PLANE OF PROPOSAL
DIRECTION: :--: 70 DEG. 54 MIN. W
RECORD OF SURVEY
RADIUS OF CIJRVATURE METHOD
astman /
Whipstock
A PETROLANE (~OMPANY
ARCO ALASKA, INC.
LEG 4, SLOT NO: 25, WELL NO: K-SRD TELECO
KING SALMON PLTFM. COOK INLET, ALASKA
COMPUTATION
TIME DATE
16:12:42 06-MAR-85
PAGE NL.
TRUE
MEASURED DRIFT DRIFT COURSE VERTICAL VERTICAL SUBSEA R E C T A N G U L A R C L 0 S U R E DOGLEG
DEPTH ANGLE DIRECTION LENGTH DEPTH SECTION TVD C 0 0 R D I N A T E S DISTANCE DIRECTION SEVERITt
FEET D M D M FEET FEET FEET FEET FEET FEET D M DG/100FT
6905. 52 48 S 68 18 W
6942. 52 2:6 S 68 30 W
7050. 50 12 S 62 42 W
7086. 50 30 S 62 0 W
7112. 50 42 S 62 0 W
0. 5048.28 4042.64 4948.28 2325.79 S 3472.78 W 4179.65 S 56 11W
2:7. ~¢)70.70.. .4£)72.04 4970.70 z~¢,~.'-'°~'~ 63 Ss:~c)c). 14 W 4208.42 S 56 16 W
108. 5138.08 4156.04 5038.08 2371.48 S 3576.97 W 4291.69 S 56 27 W
36. 5161.05 4183.46 5061.05 2384.34 S 3601.53 W 4319.27 S 56 30 W
26. 5177.55 4203.30 5077.55 2393.77 S 3619.26 W 4:339.26 S 56 31 W
0.00
4.75
1.71
0.77
714:}. 51 6 S 62 0 W
7173. 51 18 S 62 18 W
7201. 51 18 S 62 42 W
7231. 51 48 S 63 0 W
7300. 50 6 S (:,2: 0 W
31. 5197.10 4227.07 5£)97.10 2405.06 S 3640.51W 4363.21 S 56 2:3 W
30. 5215.70 4250.18 5115.90 2415.~9 S 3661.18 W 4386.48 S 56 35 W
28. 5233.41 4271.80 5133.41 2426.08 S 3680.56 W 4408.22 S 56 37 W
30. 5252.06 4295.06 5152.06 2436.80 S 3701.47 W 4431.57 S 56:39 W
69. 52~5.53 4348.13 5195.53 24(:,1.12 S 2:749.21W 4484.83 S 56 43 W
29
·. 03
1.11
i. 84
2.46
7332~ 52 24 S 65 6 W
,.=,~_-,4 Pi2 42 S (:,4 24 W
73'?~4. 52 36 S 63 42 W
745R. 52 54 S 63 24. W
7520. 53 30 S 65 6 W
32. 5315.56 4372.91 5215.56 2472.04 S 3771.65 W 4509.58 8 56 45 W
32. 5335.02 4398.17 5235.02 2482.88 S 3794.62 W 4534.74 S 56 48 W
30. 5353.22 4421.84 5253.22 2493.31 S 3816.06 W 4558.39 S 56 50 W
(:,4. 5:~:91 96 4472. ~'~ '-'~'
...... ._-,o(:, 1 (:,7 W 4608. ~ ~ ~'
· -, =, 5291 96 251 (:,, 00._,c' , ~/...~ ._,c- 5(: ..... , W
62. 5429.09 4521.67 5329.09 252:7.57 :--: :]~906.39 W 4658.23 S 57 0 W
8.82
1 .S~7
1.88
O. 60
2.40
"~.~'-' ~ (:, (:,4 6
/ .. ,=,4. .. 4 S W
7616. 54 48 S 64 6 W
'7677. 55 42 S (:,4 24 W
7738. 56 18 S 64 24 W
8015. 55 30 S 65 2:0 W
· ~, 4573.00 72 '::9.~,c: £)4 W 4709 42 .:, 57 .~, W
(:,4 ._ 466 ,'=:".-~ -=,"'/'/' :=:9 '-'.=,='~' c. ,".
. . _ . . _ . .~.._.,_l.-/. ._ . _._ .
._ .,.~ ~.r', ._, . ._
32. 54:_==5.50 4598.86 5385.50 2571.10 S 3'.--/76.4/_-, 14 4735.27 S 57 7 W
(:, 1. 5520.27 4(:,48./_-,4 5420.27 2592.87 S 4021.60 W 4785. O0 S 57 1 ! W
61. 5554.38 4(:,';')8.89 5454.38 2614.72 S 4067.2 ! H 4:335. ! 8 S 57 16 14
277. 57o:--.~. 67 4927.01 5609.67 2711. :=:4 :=: 4275.00 W 5062.57 S 57 2:7 14
1.57
2.19
I. 5:3
O. 98
~"~-4 4
8202. 52 30 S 67 0 W 187. 5819.58 5077.78 5719.58 2772.76 S 4413.45 W 5212.17 S 57 52 W
8510. 54 0 S 68 0 W 308. 6003.86 5324.12 5903.86 2867.20 S 4641.44 W 5455.62 S 58 18 W
8681~ 54 30 S 69 0 W 171. 6103.76 5462.78 6003.76 2918.06 S 4770.56 W 5592.26 S 58 33 W
8947. 54 0 S 73 0 W 266. 6259.17 5678.61 6159.17 2988.33 S 4974.(:,4 W 5803.20 S 59 0 W
9175. 53 30 $ 72 0 W 248. 6405.82 5878.53 6305.82 3048.47 S 5165.37 W 59?7.85 S 59 27 W
1 . 7:3
O. 55
O. 56
1.23
O. 38
'P390. 52:15 S 72 0 W
9702. 52 0 S 76 0 W
?926. 5£) 15 S 76 0 W
10176. 47 30 S 77 0 W
10428. 52 30 S 78 0 W
195. 6522.15 60:35.00 6422.15 30c76.83 S 5314.22 W 6150.71 8 59 46 W
312. 6711.54 6282.52 6611.54 2:165.15 S 5552.50 W 6391.28 '._:; 60 1';-~ W
224. 6852.12 6456.2I 6752.12 3207.34 S 5721.70 W 6559.34 S 60 44 W
250. 7013.24 6646.46 6913.24 3251.97 S 5'.-707.57 W 6743.49 S 61 10 W
-..-'...,..' · 7171, '8_1 A,:,40,_ ?7 7071,81 --,.-,c~- :::5 E; c,,.,~ "'¢/'-'; ,:,, 75 W 1, ::,
f., ;~..:, 6:]: 61 :]:7 W
· _'~,~ :: -r ,.
0.13
1.09
0.78
0.43
1.23
_ East n /
Whipstock
A PETROI..ANE COMPANY
ARCO ALASKA, INC.
LEG 4.,' SI_OT NO: 25, WELL NO: K-SRD TELECO
KING SALMON PLTFM, COOK INLET, ALASKA
COMPUTATION
TIME DATE
16:12:42 06-MAR-85
PAGE NO.
MEASURED DRIFT
DEPTH
FEET
TRUE
DRIFT COURSE VERTICAL VERTICAL SUBSEA R E C T A N G U L A R C L 0 S U R E DOGLEG
ANGLE DIRECTION LENGTH DEPTH SECTION TVD C 0 0 R D I N A T E S DISTANCE DIRECTION SEVERITt
D M D M FEET FEET FEET FEET FEET FEET D M
10677. 55 15 S 83 0 W 251.
10870. 51 30 S 80 0 W 191.
11-154. 52 45 S 84 30 W 284.
11313. 53 0 S 84 0 W 159.
11559. 55 45 S 85 0 W 246.
11932. 59 0 S 85 0 W 373.
12084· 58 0 S 87 0 W 152.
12174· 57 36 8 89 30 W 90·
12314. 55 30 S 89 0 W 140.
12507. 52 0 N 89 0 W 193.
7319.77 7040.79 7219.77 :3327.80 S 62.98.63 W 7123.69 S 62 9 W
7433.6.9 7191.42 7333.69 3350.45 :E; 6450.19 W 7268.45 S 62 33 W
7608.05 7411.15 7508.05 3380.67 S 6672.25 W 7479.83 S 63 8 W
7704.01 7534.51 7604.01 33.93.37 S 67'98.40 W 7598.24 S 63 28 W
oo 7747 29 :3412..~,~ c-
7847 29 77~. ..... 84 /-,'~97 c.
· _.~ ._, 42 W 7785 19 64 0 W
8048·36 8033.48 7948.36 343.9.91S 7310.32 W 8079.22 S 64 48 W
8127.78 8158.60 8027·78 3448.95 S 7439.60 W 8200.18 S 65 8 W
8175.74 8231.29 8075·74 3451.27 S 7515·72 W 8270.26 S 65 20 W
8252.~0 8342.15 8152.90 3452.80 S 7632.51W 8377.17 S 65 40 W
8367.01 8489.19 5:267.01 3452·80 S 7788·12 W 851.9.19 S 66 5 W
DG ./100F-
. .'.~ ,_l
~.33
1·33
0.30
1·17
87
~. 30
2.3.9
1.53
2.00
12677. 51 45 N 89 0 W 170. 8471.96 8614.78 8371.96 :3450.47 S 7921.83 W 8640.67 S 66 28 W 0.15
12800. 53 15 N 87 30 W 123. 8546.84 8705.96 8446.84 3447.49 S 8019.36 W 8728.99 S /.,6 44 W 1.56
12947. 50 19 N 85 22 W 147. 8637.77 8812.52 8537.77 3440.31 S 8134.61 W 8832.19 S 67 5 W 2.30
;L '-"=;-;":.' - '
.'.~ ,,.~ 49 :::(') N o'-"-'.:, 40 W 32.
o c, ,_, .:. .=: ::. ::::::~4 78 855::: .=-"8 ._4.~,7.97 81 9P. W 73 ._, /..7 9 W 4 80
. -- . . .
I:=:124. 47 0 N 83 0 W 145. 8754.92 8.932.20 8654.92 3425.41 S 8266.42 W 8948.02 $ 67 30 W 1.76
13245· 45 45 N 83 0 W 121. 8838.40 9010.85 8738.40 3414·73 S 8353.35 W 9024.35 S 67 46 W 1.03
13452· 4.5 45 N 83 41W 207. 8982.85 9144.39 8882.85 3397.54 S 8500.62 W 9154.44 S 68 13 W 0.24
1~'~' 9224. ~'9 .-,o~, ,-,~,,-, ---- c. 68 09 W I 10
· :,._/o 44:31N 8'~ 47 W 126. 9o71. . . 7:2: 74 ,:,~71 . 73 .:,._,,:,7. 02 c-._, ,:,._c,~.30 W '~:z. o~ ~ ._, .
13729. 43 6 N 81 15 W 151. 9180.70 93~7.80 9080.70 3372.50 S 86.92.81W 9324.09 S 68 48 W 1.17
13761. 42 31N 7.9 59 W 32. 9204.18 9336.92 9104.18 3368.96 S 8714.26 W 9342.82 S 68 52 W ?-~.5
137.92. 42 0 N 80 42 W 31. 9227.12 9355.19 9127.12 3365.46 S 87:34.82 W 9360.73 S 6:3 56 W 2.28
13.91.9. 4:3 22 N 7/-. 54 W 127. .9320.48 9429.51 :-?220.48 3348·74 S 8819.26 W 9433.63 ,.E; 69 12 W 2·2:0
13982. 44 10 N 81 0 W 63. 9365.'.']7 9467.19 ':-.~265.'~7 3340.:39 S 8862.02 W 9470,67 S 69 21 W 4.68
14044. 44 27 N 79 0 W 62. .9410.34 9505.03 :~310.34 3332.87 8 8904.67 W .9507.95 S 69 2.9 W 2.30
14116. 44 20 N 8:3 0 W 72. 9461.79 '.~54'.'.-~. 45 '.'.7361.79 3324.99 S 8954.41 W 9551.80 S 6~ 38 W 3.89
14264. 48 !5 N 81 15 W 148. .9564.03 S/644.78 .9464.03 3310.34 '.=; 9060.36 W 9646.16 ,.E; 69 56 W 2·78
FINAL CLOSURE - DIRECTION:
D I'.:.;TANCE:
,:.~p c. W
._,c. /.,,.=,_. DEGS ._._.=,.=, M INL:; 46 ...... ...
7646.!6 FEET
Eastman /
ARCO A~ASKA~ INC.
LEG 4~ '.-];LC[T..._'":-'~, WELL NO: K::: RD TELEE:F~_
KING '.3ALMON PLATFORM, CL]O~::: INLET, ALASKA
(FI BROWN)
VERTIC:AL '.:;ECTION CALCULATED IN PLANE OF F'ROF'OSAL
DIREF:TION: S 70 DE[];. 54 MIN. W
RECORD OF SURVEY
MltqlMUM CURVATURE METHOD
_ Eastman / :
A R C ~:'~ A L A ~'--~ K A I N F~
LEJ] 4 '.:;LJ-JT 25 WELL NO: 1'::.'8 RD TELEL-:O
i':::ING .':_;ALi'lCIN PLATFCIRM, I-:I]IOK INLET. ALA'.E;KA
(H BROWN)
F: 01'1F' LIT A T I 0 N
T I ME DATE
1 (-): (5 :l: 3:/:, 14-, IA N--,:,._
F'AOE NO., i
TRUE
MEASURED EIRIFT EIRIFT COLIR'.-.:E VERTIC:AL VERTIC:AL :::;LIB:-.:EA R E C T A N G U L A R C: L. 0 S U R E
D E'.' P T I. ] A N G L E _ri I R E C T I iD N L E N G T H D E P T H :-:; E C T I 0 N T V_ri C 0 0 R ri I N A T E :=; D I ::.': T A N C E D I R E C: T I 0 N '.=; E V E R I T"
FEET :l::l M r'i M FEET FEET FEET FEET FEET FEET [I h'l ~..IG / 100F:"
6::-0 .... ccd 4:3 :B /_-,8 18 W
70/:,1. 52 6 :-:; 6'.T* 0 W
7156,. 51 48 :B 70 /:, W
7:B5/-.:,. 50 12 '.=; 7t 6 W
75:--:1. 49 6 S 71 :B/:, W
762/:,. 4L=: 24 :=; '71 4::: W
77.7'.:.:'. 47 1:3 S 74:36 W
'/811. 47 4,2 '.:"'; 7.5 /_", W
7:=:4:-.':. 4:-:: 24 S 7/:, 0 W
/,:,, ._,. 4'-:). ._,':-'z',_, ~; 7~::, 0 W.
O. 5048.28 4.042.64 4'F-'48.2:3 2:325.7'.~ S 3472.7:3 W 4179.65 :-:; L=.,6 11 W
1~/-,. ~]:1.4.::.":'~ 4166.22 5043 ~:~] 2:Z:70.82, '.B c .... :,7 ?7 W 4:B00.50 '.B 56 33: W
95. 5201.$)1 424i.01 51C,]~91 2:B96.96 :B 3658.06 W 4373.42 :B 5&, 46 W
200 ..... ': '-':,'-'z 7.77 4- ?:'g' !-, a.-::N z.:'-/. 77' 2448. !-, ..... (5 S 3804. 1-, ~ W 4 '5.: '-'z 4 .4. 9 S 57 14. W
57
. ._,.:,41 07 1 S; :2,9::: 1 01 W 4. :,..: .:,, :E; :B8 W
R =" ~ 4 N':";¢ 7':' .... " 249 ':' ~ t =~"" 94.
17._. 41 07 ..........
· Z~ N' . .......
':~.=, 5.~";c:':::: 7:1. 4./:,C:'.1. 21 .~40:-.:. 71 2.~l:Z: i.,:, c. ':-:':'~9:.-.: 8::: W 472:B..._":'/-, c:.._, P:7 r:;l W
..._ . .... ~
·
1 .=, ':' 5/:, 06 -4-,:':, 4-714 .'=;
........... · ...... , O, '..:, 4 ,:") ..,_'---'.'=;-,_ 4/.-._ 4.,_":: S.; 41 ,F:'. 7 · :"::_ 'g'. W 48 :"::: 2 · 72: '='_ '-'_ .,...'--"
32. 5628.02 4738 ,, 0/:, 552:-': .. 02 2552.6"_-,5 S 41. 30,, 1/:, W ,4-:-:':-',55 ,. :2::'2: '.::; 5:-.: 17 W
:':-':2. 5/:,47.41 476 .i. ,. 78 554':.':'. 4.1 2.--:558.58 L:; 4-15:3.21 W 4:-:--:7:-:.::. 06, '.B 58 22 W
:'::2. 5/.:,70.40 4785,., :-:--:4- 557,:":,. 40 2.564.. 4.:3 '.B 4.:1.7/_-,. 64 W 4':-'7,(:,1.0:-:':'.B .5',B 2'7 W
0.00
0.57
0.
! '7
0. c, !
75
1,54
1.70
:B, 0:2:
3',. 75
7?02. 50 24 S 76 24 W
7'~ :':: 9. 51 12 .?.'; 77 6 W
79,'.':,8. 52 6 S 7'7 6 W
:E:OO,.'D. 53 12 ~E; 77 24 W
80:B0. 54 12 '.B 77 24 W
27. 5687.76 4806.4:3 55:3'7.76 ?_'567.36 S 41 ?6.7:3 W 4':..720. 78 S 5:3 31 W
:_::7. 571 !. 14. 4-8:-.:4 . '=.,':~; ...... P~/-, 1 I . 14 .,_ _'-..' !=; 7 .~':;. _. 9~:... '.=; 4224 ./:,:B W 4?4:--.: . o'.-,.._ '.::: ._,_,~'.-." :_--::'-'-: W
.... .,:. ............ .a.:,,:, 1 1 :::; 424/:,. :--.:~.:) W 4-? 69./:, 0 '.=-; ~':' 43 W
2 ?. ~ -;"--":~ 1 :-.: ,t :::.=; 7..=;/-,.=';/-, 2 'T~ 1 :B'-' ='-' .0 .....
:2::2. 574-;-.:. =;.=,._ ._ 4-882 .84 ~./-,4:--':. ~ ..... 2RE:~, .6,2 S 4271 ./-,1 .... W -1-';*';*:::.7:2: ._,c' .~.-;,::,._ ,.., 4.:E: W
2:(3.. 5766.31 490`2,,, 87 5,2,/:,,/_",. :31 25'.;"1.89 S 4295.21 W 501/:,,, ~.~.'5-, S 5:-.: 54 N
..-,
· :,. 17
2.61
· ",, 1
":' :-':::Z:
o_,, ·
819:-::. 56 15 S 79 0 W
:3:311. 5/: 15 :B 7:-':: 0 W
,: ..... -:,;_-,. 15 '.-~; 81 0 W
87 :B:"::. 54 4.~5:3 7:.:3 0 W
905 ?. ~54 C) ,.E: 79/ (]) W
168. 5862.13 5043.72: 5762.13 262(.":'. 09 '.B 4,4.:-::0.2:-:: W 5147.0/:. '.B 5'7 24. W
,_1 ':,*
4 ._~ ..-' -.-'. W 'T/:':: ~ '-
11 :z:P;'"724 '"-' 1 51 :z:&,. ,-,,= 5:-'-:24 ':' ':"/' ':'::' ':'"'-"-' :7.:.=' ~'":"":'-=;
......... :,._, . ..- 1 ~,_,._, _,. 82 ~3 . _ .......... . . _ '.B . 44- W
'-' ~ .... 5'.'T~ 7'."-.~. 26 ::: 0. '7-_.I 7 S 4. 745. :--': 0 W 54-50 · :-.:/-, '.-':; /-, 0 3 :":: W
.,-- 7._ &, 07':T* 70 ~ :z:/_, :1.. 57 70 _ -. -
1 ,-1-7. /:, 16,.1-. 0:3 5480.6, ! ,'!:,o/:,.::l.. Cx':: .'--::702.2C) :3 4:.--.:/_",4. 1 :B g! .':5.'"_5/_-,4. :_::6 :_:; /:,0 .'57 W
. "-'~'-' ..... "-'.=,'-' '-':'*227~5 04 :--: ~123 ~B4 W .'"";:-:":17 .~/",:--; /=,1 4,'-I. W
:-.: 2/_-, ¢:, .: .... .:,. ':".,' 2 .~, 74 :':: 2,/:, c:, ,-: ._ .:, · .........
?:209. 152:30 S 81 0 W
938t. 52 15 '.=; 81 0 W
'.;*~, 6 C). 5 C) 15 :B :E:2 0 W
9727. 50 0 S 8:B 0 W
1C) 012. 48 15 :B :34 0 W
1.4,&,
0. 15
o. 77
1.2(:)
O, 6,7
1(:)167. 48 45 S :-.:7 0 W
10405. 55 0 N 90 0 W
1052/:,. 57 0 S; ._,..- '='''-'' 42 W
1(.")5:}:7. 57 /_-, $ :=:? 42 W
1 o ~; F:.'=, 5 ~, /_-, '.:-; '-":' /_-, W
155. 7(::)55.4:'-'": ./:,582.89 ~,955.4::'-: 2869.65 '.=; 5972./:,9 W /:,&.2/=,. :B 1 S 64 20 W 1.4:-::
:2:2::-.:. 72(_-:'2. :-.:6 6761 · 16 7102.3:6 2:::74. :34 :-.; 6157.7:7: W /:,'7'.::~7. :2:6 :::; /:,4 .59* W 2.81
121. 7270. (:'2 6;-::56.04 7170.02 '7..-::B74./:,0 ,.E; /-',26C). 04 W /:>:BE:E:. 50 S /_-,5 20 W. l. ~,7
1 l. 7276.00 /_-,8~.4.77 717/_-,. 00 2874..~,5 :-.; /_-,2&,9.27 W ~,:3':.?/_-, . '.;¢ 1 ::Z-; /:,5 2:2 W 0. '.71
........... · .'-,::,7._ 4.2 :-_-'; /-,:::('~9, '-"-' W ' ::, .:,
':' 72(')2 4 :Z': """" '-; 6'.-.-/3 :_--~ /-,6 -' 6,5 F~O. ~,,,I '-' -1-',B
4 ,_,. 7.':', c}'.~' -1. 2, /-, 9 c)'.?,_,':',_.':' . .... . -, .:, , _ - ·
_ ,Eastman / :
L.iEA_ 4, :::Ln]"_ _ ..-._,'-'=: WELL NO: I<:-: Rn .... TELECA (Fl BRnWN) TTMF DP.,TE
I I'-.IF.i SALMON PLA]"FORId, F:OOK l I',ILET, '" ""-"'"
14'-,J A N-,:,..., -;
(4 L ~,.'-,,'-.. A 1 ('3 ,", (') 1: ":'/-' ' '-' "=
_ - ...,
TRUE
E A'.-;I_I Fi E D [I Fl T F T D R I F T is:i"ll_l R'.:;E V E R T T C A L V E R T I F:A L S I_l El'.:; E AR E C T A N I"'.i I_1 L A R is: L C[ S I_l R E El 0 G L E
DEPTH ANC'iL.E DIREC:TInN LENFi]'H lqEPTI-t '.::;EF:TInN TVn F: iS[ 0 R El I N A 1' E S DI'STAI',.IC:E r'iIREC:TIOI'.I F;EVERIT
FEET D I'1 D 1,1 FEET FEET FEE]' FEET FEET FEET D M DG/100F
I066,0, 53 1:--: S 8:3 6 W
106,86~ 51 3('.3 S 81 0 W
10717, 50 L54 '.:-; 79 12 W
107-1.8~ 51 12 S 7'.,'-.~ 54 W
10'772~ 51 30 S 7'.-.-~ 54 W
10:.-!:10. 51 18 F.; 80 1::: W
1(:3842. 50 4-2 ::; ::"]0 18 W
· 1 (~3F:74. :=~0 ':'/-- S :::(') 1 ::: W
..... u - ~ ._l ,..~ ...
:[0S./44, 50:2:0 S 80 :_',6 W
- Pi. -' '-' · = . . :2 :.:: :--2: (') /.., :':: 7 (') /., ,:r) 9 /
7._ / ._-, 4 .... 78 6'.'} 62 04 7245.7 ::: .06 ::; .... :':::3 W ..... 1:2: S 65 40 W
2 6 7 261 /' ~' ' '- ~'''-' '?-~ /' ::: ''? r) '.:S .... 4 :-'", W
, .,-,._,_ o ::~,::,~, .-._ 726,1 , /.,.':-i_ ._ 2:'-':::"":2 . '::'.. 1 '.:i; __ ..._, 7:':-: W 7(') 1 (')., :::'...-/_. /- 5
/
. :_---',1. '7:-':::-::1,0'7 70('36.0'.-.? 7281,07 2:_::::37. OA_ .'-:; 6/_-,4-14. . ._,":'-'-'~ W 7('3:.--:;I.. _ · 2e. :.':; :,..., 4/-,_ W
:31, 7400, 5/', 702 '.-?, '.:) 3 7 :'-": 00 ,, 56 2--:',:::':.-.~ 1, '!. ::': '.:; 64. :':: 8, '7..: :':', W 7057,7 l '.-i; 6, 5 4 'P W
24-. -741 ._,, = .=:~-] 70. 4- n_. 4 ,.i.'. '7 ..... ::: .1. 5, 5.=; :2::-':'P 4- , ,'7...'-., S /-,_ 4-.__.."5-,/-, ,,'-,_.e W. 707..., = . ::: ..... 9 S ,:,.,/'--' P':t W
-" , ............ o 4,: ....'P 4 (]) 4- 68 6 5 55
:BB. 74:3'P. 26 7077. / c, ~:::'::'T,. 26, '5' :::':":¢ :;i:2 '.-3' ""'=. W 71 , '._:; N
. _. 7..: .... .:.- · :S"P2':.? ('34. ('32 S 6.51 (1). 45 W 712 :B. 77 :.--; 6.5 ~ ::', W
3 :.2, 745'P :'::':.) 710:2, 2'P "'-' ='-' - ·
.... ~"-' N 7].=.-.... 74 S 66 .1. N
32 74. 7'.:) /-,',:::71 '":'/- 7 c) 7 ::: / ':/ 6, 8 2".:'~ C, 8, .1. 8 '._:; 6,._,._-, 4. ::: :-~ ._, ..-
10'77!5. 50 24 S 80 36 W
11006. 50 24 S F:I 0 W
110:7:: 7..:~.~ r._3 1 .--'-' S ::~ ]. (:3 W
11(1367. 51 0 '.S :::.1. 18 W
111`01. 51 0 '.S :::l 18 W
111:32.-'. .~"~1 3/', S 81 18 W
1116,4-. 51 54 ?; 81 4 :.2 W
:[119/:,, 51 5 4 '.::; 81 1::: W
11224. 52 30 :E; :}::.2 0 W
.1. 1 '-'= ' .~;
...:._,(:,. _ 2 ._,':',..,/' '.::; :B 1 42 1,4
..... / ._, ~...:, 21 '2:'P 3'P. 92' ::; 6, 7:31. :=: 5 W 7 :B 4- Fi, 82 S 66 '? .~ W
31 7643 21 7:3 :.-2 :l: ..-;., F; -' '=, '-' ..... - .-
:32. 76, 6:3.02 7:7:: 47. 'P 5 756, :3. (132 2'P 4 :'.?./'-, 4 S 675/_-,. 71 W 7 :.--: 7 (13. O',B S 6, 6 2',B W
32., 76,:P, 2., 77 7 :]-: 72,71 7582, 77 2'P 47, 36 '.B 6781 · 6,1 W 7 :i:? 4,4. 0 S 66:31 W
'":-'":' '7/-,'P'p '::".':', '7:i:'P4.4-4 '",,=,,-:,,:., o':: 2'-.'/."~0 57 '.-:; ,.:',_':::0::::_ ?']('~_. W '74.1=._, 7/.:, '.:;6/-, :3:_:: W
· ' ,.~~ · .... ..I .-' -~ ..' o~ .... ~1 ...~ · ~ . n · /~ ~
:32. 7' 7 .1. ':'..-, ._'::'-'7.¢. 741 '.::./ ,, :7:: 8 '7'. 6,1 ":'..- ~ ._'::"{~. .,_";' ':~.. =;._ 4 , 1_ 7 S 6_ 82 :.3 ,/-_,":i... N 744- 0 ,27 S /-,.. 6'_-, :::_ 6, N
1 l":.-'8/L-.. 52 24 :i:; 82 0 W
1131:::. 52 3:6 S :--.:2 0 W
11:350, 52 4.2 S :--':2 0 W
11382. 53 ,:) S 82 18 W
11412. 5:7:: 1:-2: S :.32 1::: W
J:O. 77:-'::7 ' = 7442. '~'=; 7/-,:7::7 ' ~- ";":¢5"'~' 5.~ / '-'=""
....,~:,._, , ._ ~,...., ..... ,.._ ._ S ,:,,:, ._,.~. 21 W 746, :3 .24 S /-,-/-_, 2_ 9. W
. :32 ~ ~ = -" . .................
. /.._,/. 1 :l', 74-67 /-, 6 7657 1:3 ? 9/-, 1 c) 8 S /-,877 :::N W 7 4:B7 '72 '.B 66, 4- 2 W
- o4 W 12 'S W
':' '~. ?'. 77 A...._,'='474 'P 2 .6 ::', 7 ~-_., '-~, ,_, ~- ~_ 4 2 ? 6, 4 ._=~-, ':' SA 902. "- 75 . 2 A_ 6 A_ 45
. ~ ~'-' 5 '-'-' '~ ~ ~ z '-' = '-' ~ 2'P 6',B ~ 0 '.S 6'P 27 8 ~ W 75:3 ~ ........ S /-, 6 48
3~ //: ..... :,/ /._,~7,,6~ /,:,: .... .,:,/ ....
. 7 ..... ,:~ 9'::) 6A
..... 6:~ .... 6O '=~:'- .... S _ ~ W
30 78~:3 86 7D4~ ~7 771`:3 86 277~ 32 S '- =~ . W .-,
].. o4.
0.6,2
O. :31
1.2(i)
1.
11444. 53 6 S ::_:2 42 W
11 -' =' .~:::
4,._,. __ 4:_:: ,.E; 82 42 W
11507. 5:3 42 S 82 42 W
115:B8. 5:3 48 '.S 82 42 W
1157 (')· '--"" "1.2. ':'
._,.: .... ',:_',:2 -'1-2 W
....... 7._ o c, 27 77 :'-'::3,0 :B 2'? 74. /-,'7 c ..... -' ~ 6, 7 S 6, 6 ...... W 1 1 :'--:
32 / ::',..::.:: 03 -' ='~' ' /_..,'P77 (')0 W / .... :,-, ='='
., t.-' '=i C,
. - '-' 5 · ;~'--' 75'!."¢ 0 o.J
31 7c,._ 1 ..- . 7'751 4? 2'P77.:B:7:: S 7OOl 7(") W 760:B 6,.:-: :E; /_.6 .... _, W 2 2,'.'.:,
32. 7870. 4..1. 7 ,'_'-, 1 =; '.:..' 1 7 '77 (13 ,, 41 '-":"-' ,, _ . 76, :3:7::. . 0
.... z .... :,1. 11 :i; 7027 :::c) W 4::: ::: 67 1 N .:31
.'2:1. 7888.74 7640.38 77r:::::. 74. 2'P:B4 · 2'.-} :::.; 7C, 52. 1 o W '76,5'7.5::5 :.:; /_:.,7 4 W c). :i:2
:32. 7SJ07.6,/_', 76,'i. 5./.:-,4- 7807. ,/:,,/_-, 2?87.5,'.':, :--'; '7C)77.70 W 7,'!,::_"::.::,, 40 ::; 67 7.. w o,, :31
FINAL CLOSURE - DIREC:TION:
Iii I STANC:E:
::; ,S7 DEGS 6, M II',iS 54 :::;ECS W
7/'-,:-]:2.4(]3 FEET
_ Eastman / '
SUB. SURFACE
DIRECTIONAL
~URVEY
~UIDANCE
r~ONTINUOUS
~-~OOL
Company
Well Name
Field/Location
ARCO ALASKA, INC.
TBU K-8RD (725'FSL & 133'FEL,SEC.17,TgN,R13W,SM)
Ill II
MCARTHUR RIVER, KENAI, ALASKA
Job Reference No.
71474
GUNTHER
Date
5/2/85
Computed
KRUWELL
~- SCHLUMSERSER ~
GCT DIRECTI3NAL SURVEY
CUSTOMER LISTINS
FOR
ARC3 ALASKA, INC.
TBU K-SRO
MCARTHUR RI~ER
COOK INLET, ~LASK~
SURVEY DATE: 02-MAY-1985
ENGINEER: GJNTHER
METHO]S 0m CO~PUT~TIO~
TOOL L3CATI2N: TANSENTIAL- AVERAGED DEVIATION AND ~ZIM~TH
INTERP3LATION: LINEAR
VERTICAL SECTION: ~DRIZ. ~IST. PROJECTED D~TO A T~RGET AZIMUTH OF SOUTH 77 DE~ 5 MIN ~EST
SCHLUMBERGER
GCT DIRECTIONAL SUR~E¥
SUSTDMER LISTIN-~
FOR
&RC3 ALASKA, INC.
T~U K-SRO
MCARTHUR RIVER
COOK INLET,&LAS.(A
SURYEY DATE: 02-MAY-19B5
ENGINEER: GJNTHER
METHODS OF COMPUTATION
TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION &ND AZIMUTH
INTERPOLATION: LINEAR
·
VERTICAL SECTION: dORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUT5 77 DES 5 MIN ~EST
ARCO ALASKA9 INC.
TBU K-BRD
MCARTHUR RIVER
COOK INLET,ALASKA
COMPUTATION DATE: 16-MAY-85
PAGE 1
DATE DF SURVEY: 02-M~Y-1985
KELLY BUSHING ELEVATION: 100.00 FT
ENGINEER; GUNTHER
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA C]JRSE
MEASURED VERTICAL VERTICAL DEVI~TIDN AZIMUT4
DEPTH DEPTd DEPTH DEG .qlN DEG MI~
0.00 0,00 -100.00 0 0 N 0 0 E
100.00 100.00 0.00 0 4 S 70 17 E
200.00 200.00 100.00 0 4 N 9 25 E
300.00 300.00 200.00 0 6 N 0 56 ~
600.00 399.99 299.99 1 3 N 83 41 E
500.00 499.94 399.94 3 13 S 6 51 W
600.00 599.55 499.55 6 25 S 16 38 W
700.00 698.73 598.73 8 27 S 39 44 W
800,00 797.16 697.16 11 60 S 42 14 W
900.00 894.57 794.67 13 57 S 38 I W
VERTICAL DOGLEG RECTANGULAR CD2RDINATES HDRIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DE$/XO0 FEET FEET FEET DEG MIN
0.00 O.O0
-0.08 0.37
-0.17 0.05
-0.12 0.76
-1.27 1.36
-1.76 4.42
2.16 2.7~
10.28 4.30
24.98 3.03
42.42 2.61
S 38 34 W 63.07
S 40 5 W 87.83
S ~+! 44 W 117.30
S 42 47 w 151.79
S 43 33 W 191.36
S 43 49 W 234.46
S 43 51 W 277.48
S 44 2 W 319.70
S 36 49 W 359.30
S 32 31 W 393.41
S 32 40 W 429.78
S 32 52 W 470.34
S 32 47 W 514.93
S 33 ] W 563.61
S 32 35 W 616,03
S 32 17 W 670.18
S 33 45 W 724.59
S 37 52 W 781.90
S 44 41 W 842.62
S 48 47 W 905.94
S 49 45 W 973.38
1000.00 991.39 891,09 16 48
llO0.O0 1086.04 986.04 19 45
1ZOO.OD 1t79.13 1079.13 23 5
1300.00 1269,88 1169.88 26 37
1400.00 1357.75 1257.75 30 1Z
1500.00 1443.42 1343.42 31 19
1600,00 1529.16 1429.16 30 33
1700.00 1615.56 1515.56 29 57
1800.00 1702.94 1602.94 28 1
1900.00 1791.16 1691.15 28 54
2000.00 1877.14 1777.14 32 35
2100.00 1959.55 1859.55 36 28
2200.00 2037.74 1937,74 40 41
2300.00 2111.15 2011.15 44 51
2400.00 Z179.25 2079.28 48 54
2500.00 2244.12 2144.12 49 37
2500,00 2308.87 2208,87 50 5
2730.00 2372.82 2272.82 49 9
2800.00 2439.37 2339.37 48 2
2900.00 2506.30 2405.30 48 15
3000.00 2572.26 2472.26 49 10
3100.00 2637.49 2537.49 48 58
3200.00 2703.31 2603.31 49 22
3300.00 2767.27 2667.27 51 2
3400.00 2829.51 2729.61 51 39
35O0.33 2891.72 2791.72 51 29
3500.00 2954.21 2854.21 51 9
3700.00 3016.73 2915.73 51 4
3800.00 3080.02 2980.02 51 6
3900.00 3142,$4 3042.54 50 38
S 55 10 W 1042.07
S 59 45 W 1113.11
S 50 45 W 1185.76
S 50 45 W 1261.82
S 60 31 W 1337.01
S $0 37 W 1411.84
S 60 38 W 1486.69
S 60 44 W 1560.98
S 60 59 W 1635.87
2.85
3.25
3.41
3.57
2.87
0.10
0.95
0.95
5.79
2.95
3.62
3.82
4.34
4,62
2.95
0.30
2.32
6.30
3..75
1.35
2.35
4.74
2.78
1.59
0.75
0.41
0.73
I .76
1.09
2.9~
0.00 N 0.00 E
0,27 S 0,14 E
0,18 S 0,21 E
O.OB S 0.15 E
0.34 N 1.23 E
1.96 S 2, 26 E
10.39 S 0.16 E
21.68 S 5.58 W
34.24 S 17.77 W
51.43 S 31.72 W
0.00 N O 0 E
0,31 S 27 32 E
0,27 S 50 15 E
0,16 .S 62 2
1,27 N 74 39
2.99 S 48 58
10.39 S 0 54
22,38 S 14 25 W
38.58 S Z? 25 W
60.43 S 31 39
72.23 S 48.14 W 86.80 S 33 40 W
96.48 S 67.98 W 118.02 S 35 10 ~
124.05 S 91.89 W 154.38 S 36 31 W
155.02 S 120.17 W 195.14 S 37 46 W
189.83 S 152.79 W 243.68 S 38 49 W
ZZT.lO S 188.46 W 295.11 S 39 41 W
264.27 S 224.06 W 346.47 S 40 17 W
300.41 S 259.09 W 396.71 S 40 46 d
336.69 S 291.39 W 445.28 S 40 52 W
375.93 S 317.39 W 691.99 S 40 10 d
418.93 S 344.84 W 542.60 S 39 27 W
466.49 S 375.55 W 598.87 S 38 50 W
518.86 S 409.28 W 560.85 S 38 15 W
575.86 S 446.15 W 728.47 S 37 46 W
637.34 S 485.83 W 801.39 S 37 19 W.--~__
701.60 S 526.64 W 877.26 S 36 53 ~
765.78 S 567.74 W 953.28 S 35 33 W
828.49 S 612.16 W 1030.11 S 36 27 W
884.29 S 651.65 W 1104.~2 S 35 48 d
~34.87 S 716.04 W 1177.58 S 37 26 W
383.99 S 772.94 W 1251.27 S 38 9 W
1030.48 S 832.75 W 1324.90 S 38 56 ~
1070.60 S 896.42 W 1396.34 S 39 56 d
1108.48 S 953.30 W 1468.56 S 40 59 W
1146.51 S 1031,57 W 1542,35 S 41 58 W
1185,00 S 1099,90 W 1616.79 S 42 52 W
1223,41 S 1167.85 W 1591,34 S 43 40 W
1261.67 S 1235.88 W 1766.13 S 44 24 ~
1299.55 S 1303.41 W 1840.57 S 45 5 W
1337.~2 S 1371.56 W 1915.69 S 45 43 W
COMPUTATiDN DATE: 16-MAY-86 PAGE 2
ARCO ALASKA, INC.
DATE OF SURVEY: 02-MAY-1985
TBd K-8RD
MCARTHUR RIVER
COOK INLET,ALASKA
KELLY BUSHING ELEVATION:
ENGINEER: GUNTHER
100,00 FT
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SJ'B-SEA COJRSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTd DEPTH DEG MIN DEG MIN
VERTICAL= DOGLEG RECTANGULAR COORDINATES H]RIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/XOO FEET FEET FEET DEG
4000.00 3207.01 .3107.01 49 52
4100.00 3271.51 3171.51 49 38
4200.00 3336.34 3235,04 50 5
4300,00 3400,00 3300.00- 50 18
4400.00 3463.77 3363.77 50 35
4500,00 3527,~2 3427,42 50 15
4500.00 3591.77 3491.77 49 39
4700.00 3655.95 3555.95 49 56
4800.00 3721.35 3621.05 49 54
4900.00 3785.80 3685.80 49 Z
S 60 52 W 1709.39
S 60 50 W 1782,75
S 61 7 W 1856.14
S 61 20 W 1930,09
S 61 33 W 2004.27
S 61 4~ W 2078.62
S 62 13 W 2152,53
S 62 2~ W 2225.67
S 52 67 W 2300.20
S 63 3 W 2374.07
0.99 1374,59 S 1438,46 W 1989,64 S 46 18 W
0.20 1411.82 S 1505.18 W 2063,69 S 46 49 W
0.91 1448.91 S 1571.98 W 2137.86 S 47 19 W
0.47 1485.90 S 1639.36 W 2212.55 S 47 48 ~
0.50 1521.69 S 1707.03 W 2287.48 S 48 15 ~ ~
0,45 1559.32 S 1774,91 W 2362,58 S 48 41
1.16 1595.26 S 1842.49 W 2637.13 S 4~ 6 w
2.73 1530.91 S 1910.38 W 2511.85 S 49 30 ~
1.59 1565.75 S 1977.82 W 2585.82 S 49 53 N
0.58 1700'.45 S 2045.66 W 2660.12 S 50 15 W
50DO.OD 3851.63 3751,63 48 34 S 63 12 W 2447,13
5100,00 3918,31 3818,31 47 54 S 63 27 W 2519,53
5200,00 3985.18 3885,18 47 50 S. 63 25 W 2591.79
5300,00 4052.83 3952.83 46 52 S 64 9 W 2563.44
5400,00 ~120.77 4020,71 47 39 S 64 20 W 2735.00
5500.00 4188,73 ~088,73 47 13 S 6~ 42 W 2806,62
5600.00 4257.14 4157.14 46 12 S 65 19 W 2877.91
5700,03 6325,89 6225.89 47 57 S 66 6 W 2949.12
5800,00 4390,98 6290.98 50 54 S 66 3 W 3023.63
5900,00 4451,69 ~351,69 53 47 S 65 5~ W 3101,61
2,17
0,45
0,85
1.68
0,89
0,59
1,68
3,26
3,69
1,91
1734,¢6 S 2112,81 W 2733.56 S 50 36 W
1767,88 S 2179,43 W 2806,30 S 50 57 W
1801,12 S 2245,94 W 2878,93 S 51 16 ~
1833,71 S 2311.97 W 2950,88 S 51 34 d
1a65.50 S 2378.10 W 3022.49 S 51 53 W
1897.03 S 244~.34 W 3096.11 S 52 11 W
1927.34 S 2510.39 W 3165.28 S 52 28 J
1957.68 S 2576.63 W 3235.98 S 52 &6 W
1988.~3 S 26~6.02 W 3309.88 S 53 ~ ~
2020.72 S 2718,62 W 3387.36 S 53 22 a
6000.00 ~509.39 6409.39 55 36
6100.00 4565.69 6465.49 55 31
6200.00 ¢622.97 ¢522.97 54 31
6300.00 4680.16 4580.16 54 23
6400.00 ~738,66 4638.66 54 25
6500.00 4797.21 6697.21 54 46
6690.00 6855.19 ~755.19 52 58
6700.00 6916,51 4816.51 52 8
6800.00 6977.35 4877.05 53 16
6900.00 5037,35 4937,35 52 36
S 66 3 W 3181.75
S 66 8 W 3263,01
S 66 35 W 3343,40
S 66 55 W 3424,08
S 67 1~ ~ 3503.99
S 67 62 W 3583,91
S 68 15 W 3664.34
S 68 44 W 3742.47
S' 68 42 W 3821,21
S 68 51 W 3900,16
1.73
0,58
2,19
3.33
1.48
2.75
~,06
1,20
1.50
0,17
2053,92 S 2793,23 W 3467.09 S 53 40
2087,50 S 2868,90 W 3547,99 S 53 57 W
2120.33 S 2943.84 W 3527.95 S 54 14 W
2152.82 S 3019,16 W 3708.10 S 54 30 W
2184,13 S 3093.97 W 3787.23 S 54 46
2215.24 S 3168,83 W 3866,36 S 55 2 W
2245.87 S 3244.32 W 3945.83 S 55 18 W
2274.71 S 3317.86 W 4022.75 S 55 33 W
2303,58 S 3392,03 W 4100,28 S 55 49
2332.40 S 3466.41 W 4178,05 S 56 3-W
7000.00 5098.00 6998,00 51 38
7100.00 5161.53 5061.53 50 26
7200.00 5225.19 5125.19 50 47
7300.00 5287.25 5187.25 51 53
7400.00 5348.58 5248.68 52 17
7500.00 5409.51 5309.51 53 13
7500.00 5468.78 5368.78 53 55
7700.00 5526.30 5425.30 55 38
7800.00 5581,~0 548~,80 56 43
7900.00 5636.73 5536.73 56 38
S 66 13 W 3978.67
S 52 30 W ~053,87
S 62 37 W 4128.46
S 62 53 W 6204.44
S 53 36 W ~281,05
S 63 59 W ~358.30
S $6 30 W ~436.81
S 66 4~ W 6515,69
S 55 11 W 4598,03
S 65 27 W ~679.85
6.55. 2362.14 S 3540.14 W 4255.85 S 56 17 W
1.47
2.51
0.34
0.54
1.82
1.24
0.49
1.40
0.85
2395,98 S 3603,53 W 4332,37 S 56 25 W
2431,74 S 3677,86 W 4~09.08 S 56 31 W
2667.65 S 3747.57 W 4687.04 S 55 38 W
2503.17 S 3818.02 W 4565.43 S 56 45 W
2538.21 S 3889,24 W 4644.21 S 56 52 W
2573.27 S 3961.75 W 4724.11 S 55 59 W
2508.26 S 4035.68 W 4805.18 S 57 7 W
2643,43 S 4111,05 W 4887.59 S 57 15 W
2~78.25 S 4187.02 W 4970.33 S 57 23 W
COqPUTATION DATE: 16-MAY-SS PAGE 3
ARCO ALAS~A~ INC.
DATE DF SURVEY: O2-M~Y-1985
TBU K-BRD
MSARTHdR RIVER
COOK INLET,ALASKA
KELLY BUSHING ELEVATION:
ENGINEER: GUNTHER
100.00 FT
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SJB-S:A COURSE
MEASURED VERTICAL VERTI:AL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTAN3ULAR COORDINATES HSRIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IOO FEET FEET FEET. DEG MIN
8200.00 5692.31 5592.31 56 2
8100.00 5748.78 5648.78 54 51
8ZDO.O0 5807.51 5707.61 53 13
8300.00 5867.60 5767.60 52 57
8400.00 5927.12 5827.12 53
8500.00 5986.21 5885.21 54 8
8S00.00 6044.33 5944.03 54
8700.00 6101.62 5001.52 54
8300.00 $159.29 $059.29 54 34
8990.00 6217.21 5117.21 54
S 65 20 W 4761.26
S 65 54 W 4842.11
S 66 57 W 4921.59
S 65 58 W 5000.37
S 66 59 W 5079.44
S 67 40 W 5158.97
S 68 17 W 5239.51
S 68 55 W 5320.37
S 69 40 W 5401.32
S 70 29 W 5482.22
0.63
1.93
0.34
0.45
0.76
1.05
0.58
1.73
0.71
0.88
2712.87 S 4262.60 W 5052.67 S 57 31 W
2747.09 S 4337.70 W 5134.~1 S 57 39 W
2779.31 S 4411.86 W 5214.31 S 5? 47 W
2810.58 S 4485.51W 5293.31 S' 57 55 ~
2842.12 S 4559.40 W 5372.69 S 58 3 ~'---
2~73.16 S 4633.87 W 5452.32 S 58 11
2903.80 S 4709.48 W 5532.75 S 58 20 W
2933.65 S 4785.59 W 5613.21 S 58 29 W
2962.49 S 4862.03 W 5693.48 S 58 38 d
2990.29 S 4938.65 W 5773.60 S 58 48 W
9000.00 6275.32 6175.32 54 0
9100.30 6334.22 5234.22 53 47
9ZO0.O0 5392.82 5292.82 53 52
9300.00 6452.27- 5352.27 53 47
9400.00 6511.68 6411.48 53 37
9500.00 6570.80 5470.80 53 28
9600.00 6630.87 5530.87 52 51
9700.00 6691.54 5591.54 52 13
9800.00 6752.88 5652.88 52 7
9900.00 fi814.75 $716.75 51 27
S 71 I W 5563.10
S 71 28 W 5643.51
S 71 51 W 5724.16
S 72 21 W 5804.29
S 72 31-W 5884.61
S 72 27 d 5964.86
S 73 ID W 5044.57
S 73 37 W 5123.89
S 74. 9 W 5202.74
S 74 41 W 5281.24
2.33
1.19
1.37
0.47
0.83
0.59
0.72
0.36
0.48
3017.14 S 5015.48 W 5853.04 S 58 58
3043.01 S 5092.04 W 5932.01 S 5~ 8 W
3068.53 S 5168.91 W 6011.16 S 59 18 W
3093.29 S 52~5.45 W 6089.$0 S 59 28
3117.57 S 5322.30 W 6168.15 S 59 38
3141.82 S 5399.06 W 6266.67 S 59 48
3165.45 S 5475.43 W 6324.58 S 59 58 W
3188.24 S 5551.58 W 6~01.94 S 60 7 W
3210.09 S 5627.47 W 6478.66 S 60 17 W
3231.20 S 5703.16 W 6554.89 S 60 27
10000.00 6877.74 6777.74 50 29 S 7~ 55 W 5358.83
101~0.00 $941.65 5841.45 50 31 S 75 42 W 5435.87
10200.00 7004.~6 6904.96 50 17
10300.00 7069.34 5969.34 50 19
10400.00 7131.83 7031.83 52 15
10500.00 7191.37 7091.37 54 41
10600.00 7247.55 7147.55 56 19
10700.00 7303.38 7203.38 55 25
10800.30 7361.44 7261.44 53 24
10900.00 7421.~5 ?321.85 52 4
S 76 13 W 5513.09
S 75 40 W 5589.61
S 77 29 W 5567.67
S 77 56 W 5748.00
S 78 27 W 5830.71
S 78 ~6 W 5913.65
S 79 Z W 5995.02
S 80 5 W ?074.63
0.49
0.89
0.7~
2.27
2.32
2.68
0.40
1.70
2.23
2.77
3251.51 S 5778.08 W 6530.17 S 60 37 W
3271.16 S 5852.64 W 6704.76 S 60 47 W
3289.81 S 5927.59 W 6779.32 S 60 58 W
3307.75 S 6001.98 W 6853.10
3325.21 S 6078.06 W 6928.19 S 61 19
3342.27 S 6156.56 W 7005.29 S 61 30W.
3359.20 S 6237.54 W 7084.57 S 61 41 W
3375.60 S 6318.87 W 7163.99 S 61 53
3391.24 S 6398.77. W 7241.88 S 62 4 W
3~05.81 S 6477.10 W 7317.95 S 52 15 W
llODO.O0 7484.35 ?384.35 51 36
11100.00. 7544.99 7444.99 53 31
11200.00 7603.99 7503.99 54 3
11300.00 7662.78 7562.78 53 55
11400.00 7721.73 7521.73 53 28
11500.00 ?783.30 7683.30 51 20
1t500.00 7846.06 7745.06 51 56
ll?O0.O0 7907.15 7807.15 52 Z1
11800.00 7967.86 7867.86 52 38
11900.00 8029.44 7929.4~ 51 50
S 80 59 W 7152.54
S 81 58 d 7231.83
S 82 29 W 7312.22
S 82 59 W 7392.73
S 84 43 W 7473.01
S 89 33 d 7553.45
N 89 13 W 7625.18
N 88 28 W 7703.01
N 8? 54 W 7779.88
N 87 22 W 7855.87
2.12
1.31
0.77
0.53
5.57
2.05
3.88
3.65
0.45
1.93
3418.52 S 6554.12 W 7392.08 S 62 27 W
3430.35 S 6632.75 W 7467.31 S 62 39 W
3441.21 S 5712.75 W 7543.40 S 62 51 W
3451.46 S 6793.00 W 7619.54 S 63 3 W
3460.77 S 6873.23 W 7595.34 S 63 16 W
3664.14 S 6951.91 W 7767.19 S 53 30 ~
3463.51 S 7029.74 W 7836.66 S 63 46 W
3~62.03 S 7108.91 W 7907.10 S 64 2 W
3459,59 S 7188.33 W 7977.52 S 64 17 W
3456.32 S 7267.05 W 8047.12 S 64 33 W
ARCO ~LAS~A, INC.
TBU K-BRD
MSARTHUR RIVER
C33K IYLET.ALASKA
TRUE
CDMPUTATI3q DATE: 16-MAY-B5
PAGE 4
DATE OF SURV'EY: 02-MAY-1385
KELLY BUSHINg ELEVATION:
ENGINEER: GUNTHER
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
SUB-SEA COURSE
100.00 F.T
V RTICAL DOGLEG RECTANSULAR COORDINATES H3RIZ. DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUT~
DEPTH DEPTq DEPTH DEG 4IN
12000.00 8092.~1 7992.01 50 30
12100.00 8156.53 8055.63 49 5
12Z00.00 822Z.86 8122.86 48 31
12300.00 8290.07 8190.07 46 49
124~0.00 8358.92 8258.92 46 28
12500.00 8427.00 8327.00 47 53
12500.00 8494.31 839~.01 47 32
12TO0.O0 8562.09 8462.09 46 38
12800.90 8631.24 8531.24 45 59
12900.00 8700.22 8600.22 47 11
13000,0'0 8767.~7 8567,47 48 8
13100.00 8833.21 8733.21 49 20
13200.09 8898.97 8798.97 48 11
13300.00 8966.13 8866.13 47 29
13~00.00 9033.32 8933.92 46 54
13500.00 9102.70 9002.70 46 18
DEG MIN FEET
N 85 25 W 7930.85
N 85 21 W 8003.86
N 84 37 W 8075.09
N 83 31 W 81~5.21
N 82 ~3 W 8213.39
N 82 23 W 8282.02
N 81 ¢0 W ~351.45
N B1 2 W 8419.55
N 80 16 W ~486.42
N 79 37 W 8553.06
N 79 11 W 8620.94
N 78 2~ W 8689.70
N 77 ~0 W B758.06
N 77 21 W 8824.94
N 76 45 W ~291.13
N 76 4 W 8956.04
13600.00 9171,96 9071.96 46 10 N 75 31 W 9020.24
13700.00 9241.42 9141.42 45 32 N 7~ 48 W 9083.99
13800.00 9311.~7 9211,47 45 22 N 73 3B:W 9146.51
13900.00 9381.51 9281.51 45 ~0 N 73 4-8 W ~208.79
14000.00 9~51.52 9351.52 45 19
14100.03 9521.53 9421.63 45 34
14200.00 9591.90 3491.90 ~$ 8
14300.00 9662.78 9562.78 44 ~0
14400.00 9733.86 9633.86 44 13
14500.00 9806.33 9706.33 43 10
14548.00 9841.33 9741.33 43 10
N 73 42 W 9271.14
N 73 57 W 9333.46
N 73 23 W }395.53
N 73 11 W 9455.83
N 73 27 W 3518.02
N 72 59 W 9577.78
N 72 59 W. 9606.24
SECTION SEVERITY NORTH/SOUT~ EAST/WEST DIST.
DEG/IOD FEET FEET FEET
AZIM'UTH
DEG MIN
1.3~ 3452.15 S 7344.93 W 8115.75 S 6~ 49 W
1.95 3446.82 S 7421.07 W 8182.47 S 65 5 W
0o32 3440.08 S 7495.59 W 8247.39 S 65 ~0 W
1.88 3432.54 S T569.3~ W 8311.31 S 65 36 W
0.63 3423,81 S 7641.32 W 8373.30 S 65 51
1.41 3414.23 S 7713.92 W 8435.73 S 66 7
1.43 3~04.12 S 7787°47 W 8698,99 S 65 23 W
1.0~ 3393°08 S 7859.88 W 8561,00 S 66 39
0.92 3381.41 S 7931.16 W 8621.91 S 66 54 W
1.77 3368.71 S 8002.4~ W 8682,58 S 67 10 W
1,43
1.57
1.90
0.76
1,98
0.95
0.31
1.lB
3355.16 S 8075.20 W 8?44.48 S 67 26
3340.52 S 8149.10 W 8807.21 S 67 42 W
3324.91 S 8222.81 W 8869.59 S 67 59 W
3308.83 S 8295.12 W 8930.70 S 68 15 W
3292,63 S 8366.80 W 8991,29 S 68 31 W
3275.29 S 8437.33 W 9050.74 S 68 47 W
3257.56 S 8507.25 W 9109.61 S 69 2
3239.34 S 8576.8~ W 9168.18 S 69 lB W
0.69 3219,78 S 8645.47 W 9225.57 S 69 34 W
0.53 3199.71 S 8713.98 W 9282.86 S 69 50. W
1.3~
1.12
0.67
0.56
3.2G
4.49
0.00
3179.75 S 8782.53 W 9340.63 S TO 5 H
3159,90 S 8851.02 W 9398.16 S 70 21 W
3139.89 S 8919.29 W 9455.83 S 70 36 W
3119.58 S 8986.84 W 9512.89 S 70 51 W
3099.~7 S 9054.24 W 9570.05 S 71 6 W,-~
3079.36 S 9120.15 W 9625.99 S 71 20 W
3069.76 S 9151.56 W 9652.69 S 71 27 ~
COMPUTATION DATE: 16-MAY-86
PAGE 5
A~CO ALASKA, INC.
TBU K-SRO
MCARTHUR RIVER
COOK INLET,ALASKA
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH
DATE DF SURVEY: 02-M~Y-1985
KELLY BUSHING ELEVATION:
ENGINEER: GUNTHER
INTERPOLATED VALUES FOR 5VEN 1000 FEET 3F MEASURED DEPT
VERTICAL DOGLEG .RECTANGULAR CDDROINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DES/100 F~ET FEET FEET DEG H[N
N 0 0 E 0.00
S 38 34 W 63.07
S 32 40 W ~29.78
S 49 45 W 973.38
S 60 52 W 1709.39
S 63 12 W 2447.13
S 66 3 W 3181.75
S 66 13 W 3978.67
S 65 20 W 4761.26
S 71 i W' 5563.10
0.00 0.00 -lOO.O0 0 0
t000.00 991.09 891.09 16 48
2000.00 1877.14 1777.14 32 35
3000.00 2572.26 2472.26 49 10
4000.00 3207.31 3107.01 49 52
5000.00 3851.63 3751.63 48 34
6000.00 4509.39 ~409'.39 55 36
7000.00 5098.00 499~o00 5'1 38
8000.00 5692.31 5592.31 56 2
9000-.00 6275.32 6175.32 5~ 0
S 7~ 55 W 5358.83
S 80 59 W 7152.54
N 86 25 W 7930.85
N 79 11 W 8620.94
N 73 ~2 W 3271,14
N 72 59 W 3606.24
10000.0~ $877.74 6777.74 50 29
11000.00 7484.35 7386.35 51 36
12000.00 8092.31 7992.01 50 30
13000.00 8767.47 8667.47 48 8
14390.00 9451.52 9351,52 45 19
14548.00 9841.33 9741.33 43 10
2.86
3.62
2.35
0.99
2.17
1.73
6.55
0.63
0.76
0.43
2.12
1.34
1.43
1.34
0.00
103.00 FT
0.00 N 0.00 E 0.00 N 0 0 E
72.23 S 48.14 W 86,B0 S 33 40 W
~18.~3 S 344.84 W 542.60 S 39 27 W
983.99 S 772.94 W 1251.27 S 38 9 ~
1374.59 S 1438.46 W 1989.64 S 46 18 '-~'
1734.46 S 2112.81 W 2733.56 S 50 36
2053.92 S 2793.23 W 3467.09 S 53 40 W
2362.14 S 35~0.14 W 4255.85 S 5~ 17 ~
2712,87 S 4262,60 W 5052.67 S 57 31 N
3017.14 S 5015.48 W 5853,04 S 58 58 W
3251.61 S 5778.08 W 6530.17 S 62 37 ~
341:5.52 S 655~.12 W 7392.08 S 62 27 W
3452.15 S 7344.93 W 8115.75 S 64 49 ~'
3355.16 S 8075.20 W 8744.48 S 67 26 W
3179,75 S 8-782.53 W 9340.43 S 70 5 W
3069.76 S 9151.56 W 9552.69 S 71 27 W
CZ>
< :=> -=~=: .:
COMPUTATION OAT~: 16-MAY-86 P~$E 6
ARCO ALASKA, INC.
DATE DF SURVEY: 02-M~Y-1985
TBU K-BRD
MCARTHJR RIVER
C33K INLET,ALAS'K~
KELLY BUSHING ELEVATION:
ENGINEER: GUNTHER
100.00 ET
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH gEG
VERTICAL DOGLEG RECTANGULAR COORDINATES H3RI[~ DEPARTURE
SECTION SEVERITY NDRTH/S3U!TH EAST/WEST' DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0.00 0.00 -100.00 0 0 N 0 D E
100.00 100.30 0.00 0 4 S 70 It E
ZO0.O0 200.00 100.00 0 4 N 9 25 E.
300.00 300.30 ZO0.O0 0 6 N- O 55 W
400.01 400.00 300.00 1 3 N 83 41 ~
500.05 500.00 400.00 3 13 S 6 52 W
690.45 600.00 500.00 6 26 S 15 40 W
701.29 700.00 600.00 B 29 S 40 I W
802.90 800.00 700.00 i1 44 S 41 58 W
0.30 0.00 0.00 N 0.00 E
-0.08 0.37 0.27 S 0.14 E
-0.17 0.05 0.18 S 0.21 E
-0.12 0.75 O.OB S 0.15 E
-1.27 1.35 0.34 N 1.23 E
-1.76 4.42 1.97 S 2.25 E
2,19 2.73 10.44 S 0.15 E
10.43 4`.26 21.82 S 5.69 W
25.46 3.06 34.67 S 18.17 W
0.00 q 0 0 E
0,31 S 27 32 E
0.27 S 50 15 E
0.16 S 62 2 ~.
1.27 N 74 39-
2,99 S 48 55
10.44 S O 49 E
22.55 S' 14 37 ~
39.14 S 27 39 W
905.49 900.00 800.00 14 6
1009.31 lO00.O0 900.00 17 4
1114.84 llO0.DO 1003.00 20 13
1222.75 1200.00 1100.00 23 50
1333.89 1300.00 1200.00 27 55
1449.10 1400.00 1300.00 31 9
1566.09 1500.30 1403.00 30 ~9
1682.02 1600.00 '1500.00 30 4
1796.68 1700.00 1600.00 28 4
1910.11 1800,00 1700.00 29 12
S 38 1 W 43.43 2.65
S 38 38 W 65.17 2.86
S 40 19 ~ 91.85 3.32
S 42 6 W 124,.70 3.35
S 42 58 W 164.64 4.00
S 43 45 W 212.42 0.75
S q. 3 4`.% W 263.01 0.80
S 44 10 W 312.15 0.39
S 37 12 W 358.12 6.13
S 32 30 W 396.90 3.13
52.46 S 32.52 W 61.73 S 31 47 W
74.33 S 49.81 W 89.47 S 33 49 W
100.33 S 71.22 W 123.04 S 35 22 ~
130,78 S 97.94 W 163.39 S 36 49 W
166.41 S 130.75 W 211.63 S 38 g W
208.05 S 170.21 W 268,80 S 39 17 W
251,76 S 212.09 W 329.19 S 43 6 W
293.95 S 252.82 W 387.72 S 40 41 W
335.44 S 290.47 W 443.73 S 40 53 ~
380.06 S 320.03 W 496.86 S 40 5 W
2027.28 1900.00 1800.00 33 35 S 32 47 W 440.43
2150.98 2000.00 lgOO.O0 38 35 S 32 45 W 492.55
2284.4`2 2100.00 2000.00 44 11 S 32 59 W 555.80
24`31,80 2200.00 21OD.D0 49 32 S 32 27 W 633.22
2586.21 2300.00 2200.00 49 53 S 33 21 ~ 716.91
27W1.05 2400.00 2300.00 48 ~2 S 41 1 W 806.25
2890.53 2500.00 2400.00 48 10 S 48 39 W 900.71
3042.50 2500.00 2500.00 49 22 S 51 35 W 1002.17
3194.92 2700.00 2500.00 49 17 S 59 36 W 1109.43
3352.35 2800.00 2TOO.O0 51 26 S 63 49 W 1226.00
3.7?
4.55
1.25
3.07
6.15
1.76
4.27
2.85
0.40
4`31.4`6 S 352.89 W 557.40 S 3~ 16 W
492.56 S 392.35 W 529.73 S 38 32 W
566.74 S 440.23 W 717.63 S 37 50 W
557.68 S 498.79 W 825.43 S 37 lO W
756.99 S 561.88 W 942.74 S 35 35 W
852.25 S 631.69 W 1060.83 S 35 32 W~-~
930,22 S 710.72 W 1170.65 S 37 22 ~
1004.~7 S 797.78 W 1282.74 S 38 27 W
1068.66 S 893.09 W 1392.71 S 39 53 W
1128.40 S 998,99 W 1507.07 S 41 31 W
3513.30 2900.00 2800.00 51 31
3673.24 3000.00 2900.00 51 20
3831.91 3100.00 3003.00 51 18
3989.13 3200.00 3100.00 49 48
41~4.05 3300.00 3200.00 49 ~7
4300.00 3400.00 3300.00 50 18
4457.00 3500.00 3400.00 50 28
4612.69 3600.00 3503.00 49 4`0
4767.47 3700.00 3600.00 49 ZO
4921.65 3800.00 3703.00 4`8 50
S 60 29 w 1346.98
S 60 37 W 14`65.66
S 60 54 W 1584.87
S 60 53 W 1701.40
S 60 55 W 1815.01
S 61 20 W 1930.09
S 61 39 W 2046.69
S 62 14 W 2161.86
S 62 47 W 2275.16
S 53 7 W 2389.94
0.50
0.95
0.63
1.29
0.36
0.47
0.76
1.20
1.97
1.55
1190.12 S 1108.95 W 1526.71 S 42 58 W
1251.43 S 1217.68 W 1746.09 S 44 13 W
1311.69 S 1325.14 W 1864.54 S 45 17 W
1370.55 S 1431.20 W 1981.60 S 46 14 W
14`28.19 S 153~.53 W 2096.31 S 47 3 d
1485.90 S 1639.36 W 2212.55 S 47 48 W
1543.52 S 1745.74 W 2330.32 S 48 30 W
1599.75 S 1851.03 W 2446.53 S 49 9 W
1554.41 S 1955.77 W 2561.66 S 49 46 W
1707.85 S 2060.24 W 2576.06 S 50 20 d
ARCO ALASKA, I~tC.
TBU K-BRD
MCARTHUR RIVER
CD3K INLET,ALASKA
COMPUTATI3N DATE: 16-MAY-86
PAGE
DATE DF SURVEY: 02-M&¥-1985
KELLY BUSHING ELE~ATIgN: lOD.O0 FT
ENGINEER.: GUqTHER
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUE-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH OEG MIN DEG
VERTICAL DOGLEG RECTANGULAR COORDINATES H3RIZ, DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
[.25 1758.B0 S 2161.30 W 2786.50 S 50 51
0.95 1808.41 S 2260.54 W 2894.89 S 51 20
1.76 1855.59 S 2357.50 W 3000.17 S 51 47
0.69 1902.24 S 2455.38 W 3106.03 S 52 14
3.18 . 1946.27 S 2550.99 W 3208.66 S 52 39
3.92 1992.99 S 2656.30 W 3320.84 S 53 7
1.76 2048.38 S 2780.76 W 3653.7~ S 53 37
2.68 2107.57 S 2914.~9 W 3596.68 S 56 7
1.75 2163.61 S 3046.25 W 3734.67 S 54 36
2.41 2216.75 S 3172.52 W 3870.26 S 55 3
0,6~ 2267.05 S 3298.19 W 4002.20 S 55 29
1.36 231~.71 S 3420.68 W 4130.25 S 55 54
$.88 2363.15 S 3542.49 W 4258.38 S 56 17
0.82 2~17.68 S 3650.81 W 4378.76 S 56 29
0°78 2675.04 S 3762.03 W 4503.19 S 55 39
2.00 2532.67 S 3877.90 W 4631.68 S 55 51
Z.70 2591.92 S 4001.12 W 4767.29 S 57 3
0.76 2654.96 S 4136.09 W 4914.88 S 57 18
1.06 2717.54 S 4272.9~ W 5063.99 S 57 32
1.06 2775.32 S 4402.39 W 5204.26 S 57 G6
1.55 2827.56 S 4525.31 W 5336.06 S 58 0
1.5~ 2880.63 S 4651.60 W 5671.22 S 58 13
1.63 2932.83 S 4783.~6 W 5610.97 S 58 29
0.97 2982.16 S 4915.84 W 5749.68 S 58 45
2.07 3028.12 S 50~7.75 W 5886.37 S 59 2
1.75 3071.69 S 5178.27 W 6020.78 S 59 19
1.1½ 3112.90 S 5307.41 W 6152.95 S 59 36
1.03 3153.53 S 5436.39 W 6286.83 S 53 52
0.56 3191.31 S 5562.06 W 6612.55 S 60 9
~.78 3226.31 S 5685.33 W 6536.97 S 60 25
0.79 3258.58 S 5804.16 W 6656.32 S 60 41
0.7B 3288.38 S 5921.76 W 6773.53 S 60 57
1.88 3316.32 S 6038.66 W 6889.37 S 61 13
2,76 3344.83 S 6168.63 W 7017.12 S 61 31
1.72 3374.65 S 6314.09 W 7159.33 S 61 52
1.6~ 3600.80 S 6~49.07 W 7290.81 S 62 11
Z.3B 3621.63 S 6573.81 W 7610.97 S $2 30
O.8D 3440.49 S 6707,28 W 7538.21 S 62 50
1.0T 3657.5~ S 68~3.68 W 7567.51 S 63 11
1.95 3464.18 S 6972.74 W 7785.86 S 63 34
5072.58 3900.00 3800.00 48 5
5222.05 6000.00 3900.00 47 60
5369.12 6100.00 6000.00 47 30
5516.62 6200.00 . ~lO~.O0 47 11
5551.82 ~300.00 ~200.00 46 ~3
5814.42 6400.00 ~3OD.O0 51 26
5983.~2 ~500.00 ~403.00 55 ZO
6150.50 4600.00 ~503.00 54 ~2
6333.69 4700.00 ~600.00 53 55
6504.87 6800.00 ~700.00 54 52
6573.20 4900.00 6800.00 52 1
6838.35 5000.D0 6903.00 52 59
7003.25 5100.00 5000.00 51 29
7160.45 5200.00 5100.00 50 25
7310.55 5300.00 5200.00 51 55
7~8~.23' 5400.00 5300.00 52 55
7553.60 5500.00 5400.00 55 1
7833.03 5600.00 5500.00 56 37
8013.77 5700.00 5600.00 56
8187,29 5800.00 5700.00 53 19
8354.0? 5900.00 5800.00 53 39
8523.61 5000.00 5900.00 54 25
8697.2D 5100.00 5000.00 54 ~6
8870.19 6200.00 5100.00 54 34
9042.08 5300.00 6200.00 54 5
9212.19 6400.00 5300,00 53 64
9380.63 6500.00 6400.00 53 29
9568.82 5600.00 5500.00 53 3
9713.80 6700.00 5600.00 52 12
9876.35 5800.00 5700.00 51 29
10034.99 6900.00 5800.00 50 25
10192.21 7000.00 690~.00 50 Z1
10368.57 7100.00 7000.00 51 19
10515.05 7200.00 7100.00 55 5
10694.07 7300.00 7200.00 55 31
10854.10 7400.00 7300.00 52 ~6
11025.35 7500.00 7~00.00 52 9
11193.19 7600.00 7500.00 54 2
S 63 25 W 2499.83
S 63 31 W 2607.65
S 54 19 W 2712.71
S 54 45 W 2818.54
S 65 55 W 2921.58
S 65 2 W 303~.67
S 66 Z W 3168.33
S 65 21 W 3311.94
S 67 18 W 3~50.89
S 67 43 W 3587.85
S 68 41 W 3721.58
S 58 67 ~ 3851.63
S 66 4 W 3981.19
S 62 22 W 6098.95
S 62 59 W 6220,19
S 53 55 W ~346.00
S 54 GZ W 6479.35
S 65 20 W 6625.00
S 65 20 W 6772.44
S 66 53 W 6911.57
S 65 49 W 5042.95
S 67 46 W 5177.87
S 68 56 W 5318.11
S 70 12 W 5458.17
S 71 17 W 5597.02
S 71 55 W 5733.98
S 72 30 W 5869.06
S 72 48 W 5003.85
S 73 ~3 W 5134.78
S 76 36 W 5262.77
S 75 9 W 6385.81
S 76 12 W 5507.09
S 77 3 W 6627.28
S 78 0 W 5760.33
S 78 45 W 5908.77
S 79 36 W 7046.18
S 81 B W 7172.43
S BZ 27 W 7305.73
11363.18 7700.00 7600.00 53 50 S 83 22 W 74~3.50
11526.70 7800.00 7700.00 51 8 N 89 49 ~ 7570.77
COMPUTATISN DATE: 16-M~Y-85
P~GE 8
ARCO ALASKA, INC.
DATE DF S~RVE¥: 02-MAY-1985
TBU K-SRO
MCARTHUR RIVER
CDSK' INLET,ALASKA
KELLY BUSHING .ELEVATIDN:
ENGINEER: GUNTHER
100.00 FT
iNTERPOLATED VALUES :OR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COJRSE
MEASURED VERTICAL VERTISAL DEVIATION AZIMUTH
3EPT~ DEPTH DEPTH DEG ~IN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HDRIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST- AZIMUTH
FEET DEG/IOD FEET FEET FEET DEG MIN
11588.29 7900.00 7800.00 52 17
11952.72 8000.00 7900.00 51~48
12312.50 8100.00 B000.00 50 22
12165.50 8200.00 8100.00 48 24
12314.48 8300.00 8200.00 46 38
12459.96 8400.00 8300.00 47 15
12508.87 8500.00 8400.00 47 27
12754.9? 8600.00 8500.00 46 11
12899.67 8700.00 8500.00 47 11
13049.09 8800.00 8700.00 48 53
N 88 31 W 7694.04
N 87 37 W 7820.23
N 86 21 W 7940.19
N 84 41 W 8050.55
N 83 17 W 8155.16
N 82 25 W ~254.34
N 81 3~ W 3357.54
N 80 41 W 8456.44
N ?9 37 W 8552.84
N 78 49 W 8654.54
0.55
3.61
2.09
0.78
1.50
1.89
1.35
0.85
1.78
1.71
3462.28 S 7099.64 W 7898.88 S 66 0 W
3457.97 S 7230.10 W 8016.48 S 64 26
3451.54 S 7354.66 W 8124.29 S
3442.~0 S 7469.96 W 8225.03 S 65 15
3431.43 S 7579.82 W 8320.36 S 65 38
3418.15 S 7684.63 W 8410.54 S 65 1
3403.17 S 7793.94 W 8504.54 S 66 24
3386.76 S 7899.18 W 8594.60 S 66 47
3368.75 S 8002.21 W 8682.38 S 67 10
3348.12 S 8111.28 W 8775.13 S 67 34 W
13201.54 8900.00 8800.00 48 10 N 77 39 W 8759.09
13350.04 9000.00 8900.00 47 22
13496.09 9100.00 9000.00 46 ZO
13640.52 9200.~0 9100.00 46 8
13783.67 9300.00 9200.00 45 29
13926.44 9400.00 9300.00 45 35
14069.02 9500.00 9400.00 45 ~1
14211.48 9600.00 9500.00 45 4
14352.33 9700.00 9600.00 44 46
14491.33' 9800.00 9700.00 43 15
N 77 6 W 8858.14
N 76 5 W 8953.52
N 75 26 W 90~6.20
N 73 43 ~ 3136.37
N 73 46 W 9225.29
N 73 55 W ~314.04
N 73 19 W 9402.61
N 73 24 W 9488.77
N 72 56 W 9572.63
1.86
0.43
0.94
0.68
0.9~
0.41
0.78
0.70
1.23
1.73
3324.67 S 8223.93 W 8870.54 S 67 59 W
3300.59 S 8331.05 W 8961.08 S 68 23 W
3275.97 S 8434.58 W 9048.&3 S 68 46 W
3250.23 S 8535.58 W 9133.46 S 69 9 W
3223.06 S 8634.32 W 9216.27 S 69 31 W
3194.43 S 8732.12 W 9298.08 S 69 54 W
3166.01 S 8829.69 W 9380.14 S 70 16 ~
3137.56 S 8927.09 W 9462.41 S 70 38 W
3108.94 S 9022.05 ~ 9542.58 S 70 59 ~
3081.10 S 9114.48 W 9521.17 S 71 19 W
14548.00 9841.33 9741.33 43 I0 N 72 59 W 9606.24
O.O0 3069.76 S 9151.56 W 9552.69 S 71 27 W
ARCO ALASKA, INC.
TBD K-SRO
MSARTHUR RIVER
COOK I~LET,ALASKA
MARKER
TOP HEMLOCK
PBTD
TD
COMPUTATI3N DATE: 16-MqY-85
PAGE
DATE DF SURVEY: 02-~Y-1985
KELLY BUSHING ELEVATION: 100.00
ENGINEER: GUNTHER
INTErPOLaTED VALJES FOR CHOSEN HORIZONS
SJRFACE LOCATION
~T
ORIGIN: ?25° FSL, 133' FEE, SEC 17, TgN, RI3W, SM
MEASURED DEPTH TVD RECTANGULAR COORDINATES
BELOW KB FROM K5 SUB-SEA NORrH/SDUTfl EAST/WEST
13828.00 9331.16 9231.16 3214.15 S 8654.56 W
14524.00 9823.83 9723.83 3074.55 S 9135.85 W
'14548.00- 9841.33 9741.33 3059.75 S 9151.56 W ?'~-
TBU K-BRD
MCARTqUR RIVER
COOK INLET,ALASK~
MARKER
TOP HEMLOCK
PBTD
TD
C2~PUTATIDN DATE: l$-M~Y-86
PAGE 10
DATE OF S~RVEY: 02-MA¥-1955
KELLY BUSHING ELEVATION: 100.00 FT
ENGINEER: GUNTHER
SU.~MARY
MEASURED DEDTH
BELOW KB FROM KB
1382B.00 9331.16
1~52~.00 '982~.83
1~548.00 9841.33
SURFACE LOCATION
&T
ORIGIN: ?25° FSL, 133' FEL~ SEC 17~ T9N, R13W~ SM
TVD RECTANGULAR COORDINATES
SUB-SEA NORTH/SOUTh. EAST/WEST
9231.16 3214.15 S 8654.55
9723.83 3074.56 S 9135.85
97~1.33 3069.76 S 9151.56
FINAL WELL LOCATI]N A? TO:
TROE SOB-SEA
MEASJRED VERTICAL VERTICAL
DEPTH DEPTH DEPTH
1~548.00 98~1o33 97~1.33
HORIZONTAL DEPARTURE
DISTANCE AZIMUTH
FEET 3EG MIN
9652.69
S 71 27 W
SCHLUMBERGER
O I RECT I ONAL SURVEY
COMPANY ARCO ALASKA INC
WELL TBU K-SRO
FIELD
MCARTHUR RIVER
COUNTRY COOK INLET
RUN TWO
BATE LOOOED 02 - MAY - 85
REFERENCE 000071474
WELL: TBU K-8RD
(725'FSL & 133'FEL, SEC.17,TgN,R13W,SM)
HORIZONTAL PROJECTION
NORTH ~ RE:F 001307! 4'/4
~~-~-4-~._~~ ~ ~ T ~-~~ ........
~ ~ i ~ i ~ -~ ."; 5 ~ ?'t~.~. ~~i ~ ~ i i ~ : ~ ~ ~ i ~ ~"?'"?"~ '~'~-~-.~-~-
~ ' ' : ~ ~ ~' · T'"~''~'T"T~-~-T~"' ~-~'"'~ ~-~-~-~ ~Lz . ~ ~ i I ' ~i 'T~-'~-~
~ ~ ~'"' ~'~-~' 'T'~"T-T'"' "~T"~+-' ""~'~'--~ ~ ~ ~ +-~ -.$...~$.....~ ~..~.. _i ] ~ ~ ~ ~ z '~ "T~'T" '~' -~-?-.+-~ ~.;.....~$~_
TT"tT""~'~'+~-~"+-?'"'+'"S~..:....-.~.-.~.-~.$.-~;-.~ ~ ...... :...: ~ ~ ; ' ~ ~ ~ ] ~ T-~' ',"Tr'~ '~"-~--~-~ ~ ~ i t ~ ~
"~+"~'-S"+-~'"~'"";-;"~"~ ...... :"4-~ ~ ~? :..._~ .$ ~ 4 T ~r" '"r?~T-'~-~r..~ ,-~.-~--+-+..g.~...~.~., .~A-g~LJ '. ~. A ~'T'~'~'
4~ ~ : : , ~ ~ ~ · : . : T r T" "'T ..... ?-??-?.....?.-?.....~....-...... ~.. ~ ;.$ ~ ~ ; : ~ ~ ~ . T ~ T-T' "T"v~-.~ ....
."T-?t ~ ~ f ~ ~ 'f'"f"'f"'~-"~...~-..~.~...~-~ ~.L.:....4...L..L..;.. ~ ~ : , 1..~) ~ ~ ~ ' ~ ~ ~ ~ ~ ~ ; ', ' ~ [ ~ i ~ : ; ~ ; ~ i ~ f ~ i ~ ; ~ ~
'"~'"~-~'~ Tt"'¢"~'-'t'"t'"Y-f'"~'"?"f"t'"f ...... ~-'~..'~...~....-~..L.L.~..--..~...~-L.~...L.~...~...~:;::::~ ] T ? ""T' ~ 'T'T' '-?~"~'"~ "-~?'-'~'~-~"'~4".;-~. -~..L..~ ...~_~4.~
~'T"='"~' TT'~'-~"~'"~?'"r'"--~'.-'..~..:-~..~-~..~.~...~...~---~-.L.L.~ ....... ~ ~ , ~ T T'"?"T'"T'"~' "'T-.-~:--~"~-~'"-'~.+..~.-~...~.~..-~---..~...~-~..L.L..~..= ~ ~
-~-~+...~ ~..~..;.~..-...~..~.~...~ ...... ~ ~ ~ ~.....~ ~ ~ ~ ~ . ~ ~ ~t'"t't'"'-T'T"t-'T'" '"t-T"T-~ ~ ] ~ ~ ~.~. ~ ~ ~.. ~ ~ ~ ~ ~ ~ ?'t .....
~ . ~'"'?" -?"t-t-t-.....-...,..-? , - ,-4 $ ~ . ? ~ = , j '-~'"" '--'"-'.~.~. - ~ · ~ ~.
i . . . ~ .... ' . . ' -?"~'". '..-...+...-.- ~ ,...-.~ ~ . $ +.... = : : · ~ , : ' . . .
-~-~-+.~-.-.&4-S&.-;.4.4...~.- ~ ~ ~ i .. ~..~ ~ ~ ~; T y ?"~' ~ ~ ~ I i'"{'" "'*"'~"*-+""'"~+"*-'~ ~-+-..~...va-.....*~..-*-.*.. ~ ~' . : s i ~ ~
. . . : : . . ~ ~. ~ ~.-.~.~ ~..~...~...~...~.., ...... . . , . : * : . , _: : .... * --, ~..*-..~ ............ ~.. ~.,~...
T'-~T-?""TT'"T-w" "*'"t"?? ....... *"'~'"* ............. *...~-~....-~...~...~...L..-~...L~.....:~ T"~"T'" "'~"?'~'"?'""-~'?~'~F-~.*...~-+---~-~...-~.g.-~.d..L.~.. ~...i ~i & ~ ~ I ~ T-
~ ~'"["?' '"T'"T'"~"~' "'P'"T"'P'"P ....... ~"'~"'~"?' '"~'"?"k"~'-5'";'"~'" "'~'"~'"~"4'"' "~"~-..4... L..;..~ ~:] ::~?-7~7::: ::~"P'"T-'T"'~"'7'?? '"~"?~"~'~ ~'~-~"~'.. '-~...5..+-~..-..~.~...~:.
-~"~'~'"~'""'~'"?'~'"~""v'"~'"~"~ ....... L.L.L.L-:...z...L.g...L. ::::::::::::::::::::::::::::::::::::: T.~.~.T.....-~:-?.?.p~..~.~-~?~..~..~.~-~.-~..~%"%~."~L-~L~L~" g..L.L.~.......Z...L.~.~
-~"P'"2'"~"" "~'"r'~"+' ""+"'+"5'"~-'" ...~...$--.~..g.......L.L.g-L..4. ~ ~.-L. ,...L..T_~ ~ ' ~'"~"~"T'" "' UT-T"T" "'T"T"'T'"~" '"~'"~'"~"~'" ~"~'~-~'"~'K '"~'-~..~...~.-g...~...~.*......~...~ ~- ~ ....... ~...~... ~. T '
_, , ~ T ~ ,'"""V'"?"V .......... T'"T .......... T"'~'"V'"*"'~'"~"+" '* ........ r.+..5......5..+..~...;......;...,..a..+...~.-44::~ ,; [ [: ':~ '~ ~ [ ~V ~ '~ "?" '"~'"T-?'?" '"v-v ..........
................ ~ + . , ~ . .
t T / ~"'t"'t'"t'"T""'"t'"t'"?'~'"~"'?"t"?'"?.'.....*...~...+...~...-.;.~ i...~...,...~...*...~..~ ....... ~.' : : : i = ~ ~ ~ i ~ : : : . ~ . : ., 'T'". ....... ?'.'"t"t ......... t ~-t-t-'t'--.., .......
"+...~...+--+...-.~...~..%.~* ....... $.......A...*.. A A : ' $ '. , . : ~ ~ . T"T'"T'"T""':'T'"T'"?'"*'"""?"*'"* .......... +...+...~...4 ............. ~...+... ,..~.~ A $ , : : : ~ =
~ . ~ t: ~ ~ : : ' T T ? ?"?'"'-'?"?",'"?'.....*...~...e...,.......?...e.-~ .......... ~....~ '.. $ ' : ~ :::~ · ~ : ~ T ~ ~ ~ -'~"T"?"T"' "w"+'~"+"~
0 ~"f'T" ";T"' '"T"T'"'"T'"T'"?~'"]' ~'"?'"~"'+-"'"+"'+'"~--'~ ....... ~...+...+..4-....~...~...U.+.......$...L..'...Z.....'...$...~...~... '.::4:::T::?:...~ ~ $ ~ $ T ....... T .. ·
' ~ i t i ~ : ; T,"?"*'"T'"'"'?"'"'?"?"'-'t ....... ,....,.......~...~ ~ ....... $...~...~ ~ .... ; ~ ~ ~ ~ ~ i ~~!i i : ~ '~:-?T '' ~ ~ ~ ! ; ' : ~ ~
'+"'""'"'t--""t ........... ; .......... ~...f ; $.~ ~ ~' .,..~ : '. t ' , : T'".'"t'"t'"~'"t'"'-?"t ............... * ........... ~..' . ' ~. ?...:..~ , ~ : J :
~ ~" ~ : ~ : ~ t ~ ' T T"?"t'"""T'"t'"?"?" "'?"t'"?'.r,, ,..?-%,,,~.,.$,.. ,,,~,,,~...~,.~ $ ~,,$...~ : ~ ~,..LZ~'L s ~ '~ , t t t'"'"'T"'t"T"t'"t"?t'"~"t-'
4...~.:]::Z: ::::Z:]:::]:'.:]:: ::] :]:::]: ~ ~ ] 'T'"t'"~"'t"'T'"+'"t'" ""t'"?? "+'+'+'+" '.+.+..~...~...,...~...$...~,..$...~...~...~...Z...~ ~:::]~:L:' :::L:]:~E: :.~..%:~ 't". '"t'"t"?'t""'"t'"t"'~-T'"t--'f'"t...+..+..
~ ,~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ 'T'"T"' "'T'"?"T ....... ?F'"T'"T"' "'f"+"f'"f'""+"f"'f...~.......t..+..~....k.~..L.4:~:...~-.~...~ ~ L..~"]'"-~ ~ ~'T'"'"t"'T'"T"'T""-?'?"t'"t'"t"r'f-'-1'"
_j ~ i ~ ~ ~ ~ : : , ~ ~ ~ ; : , ~ :, ~ ~ , ~ ~a~ T"T"'"'T"T'"T"'T'" '"7" '"?"t'"t'"?~'+"?
J ~ T T I'"T ......... t'"t'" '"T ...... t'"?"?"t ...... v"*'-'f...+..,,...?f...~..,.... ~,~.,4.g ~-.g.,4...'.i.? ~ I ~ ~ ~.~- ~ ~ ~ ~ : ~ i : : ~ J i ~
'-"'*'"+ .......... *...~...*...;..- + 4 a ' ' : $ ] ~ ' ; * : . t '~?'"?"'?"' '"?"'"'+'"T'''''''~''--.-.~-,' ' ' i i~ ~ ~ : '. ~ , , ~ J t
: ~ .. : ~ : ~ . : "'~"?"~ ............. ~...?......,... ,..,+...$.......~...~.,.~..,.. ....... ~...~,..~ ...... ~. ~ : , . : ~ :' . = ~ ~ 'T'" ""t'"'~'"~".T... ,..~...-...?..~.. -.,...,..:~...~
.~...+...?.?...L?.,~...?.~ ...................... ~...~..$..$....~ ...... ~..~ ~.......~...~ .~ .... ~ ~ ,~ : "'T"""Y"T"""~""~"'T'"T"'T ....... ~:~~'~'"+ ................... ~......¥-~ ~ .... ~ ,~...~..... ~ $~' :
$ ~ ~ $ ~ : , : ; t ~ ' , T "'"7" ""T'"T'"T'"?'"'~T"'T ........... ?..~...*...* ...... '...,..... ~ ' ' $.~ ; , ~ i : . = T' ? ....
-2000 ~ T T T'" ""T'"T'"T'"f'"~'"T'"T'"T'"T" ?"T'"T'"T'"'"'T"T"~"'? ""T'~'?~'"'?'~"?"+'" "'4'"~'"'¥.~...~...~...~::~~::: ~ ~ ~ T ~[ T"T"'~'"t'"T'"T"'T'" "T'"T"'T'"T'"~'"T'"t'"~"'~ ....
~ : ~ : : ; ' ; , ~ , .... i ~" ' : ~ ~ ; ~, : ~ ~j : T . ~ T"T" '"~"T'"T'"T'"'"?"~"'T'"~'"t"'t'"~ t' ~''
T , ~ ~ ~ ~ ~ ~ ; T ............. T'"T""t'"t ....... T"'t"T"'T'"~;T' ~'"'. .... +"+..+...~ ...... v"+...*.--~......4 ......... ' ' , ~ ~ ~ ~ ; ~ ' ; ~ ~ : ~ ~ : ~ ; ~ ~
~ 't ............... t'" '"t'"t"'t'"t ....... t...,..~ ~ .... ~...~ ' ~....~.., ~ ~ , , ~ ~ : ' J ~ . . 't'"t ...... t'"t"'t'"t ......... t ........... ]'"*'"'~ ~ ,.~... ; ~.....~ ~ ~ :
,.,...~ ......................................... . ..... , .... :::~ .................... [.,...~ .............. , ......~ + .......
, . ~ ~ ...... ~ .~ . ...,-?....~ ........................... ~ . ~ ............ ?..:...
~ · J iz ~ ~ ~ : ' ' : : : T T '~...~...?..,.-...t.......?.~......,...,..~..~...,..~...~...~...~. .~.,..~ : : ~ ~ ~ ~ ~ / ~ = ~ J ~ ~ i . T 'T'"+'"""~'"t'"t'"T ..... t"'t'"t..'t..,
~T~ ~ '~ :~"~'~g :'"T'"?"T'"T'"."'T"'?T'"t'"'"'t'"T"'~"t":~~"+..~...~...~ ....... k.~...~..+..~...~...~...~...~ ....... :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
:::::::::::::::::::::::::::::::::::::::::::::::: ?~~~~~:.~...+.k~...~.......~....~...~...~......~:..~...~...~...L:...L.~...L.....~...L~ ~.L~ U...~... ~;~ ~
~_~ ' '~...~ , ~ ~ ~ ~ : T T T ~~ ~-~: r"""?'t'~'"~'" '"~ ~ ~ .......... ~...¥.~...~ ~ ~ , ~ ,..~ ~ ~ , ~ ~ ~ / T T T t .... .'"T"'?"t"'f"T"T't"'t"'
t T T'''t'''?''' '"?"t'"~"t ...... t ................... ~'"'~'"~ *- ~ ~ ~-4 .~ ~...I.. ' ' ~ ~ T ~ T 't'"t'"t'" '"'t"'?'?-~-....?..~ ............... ~. ~ ~ , ~ ~.~ .
. ~ ~ .: . : . ~ : : . . . ~'t"' ""~"-~... ,..+......+...+..-, ~ ' ~ ' ' ~ * 4 : : ' ' ' ' ' ? '
-40D~ 'T ..... T'"?" "'~'"'"'T'"T""'"T'"T'"T"'T ....... ~...~...+...+.......~...+...~...+......~...~...~.~..~...~..+.~ ~ ~ .~..~ ~ .. ~ ,t T .... T"'T'"T'"~'"T"T" '"T"'"'T'"T'"T"T'"~'"+'"~'"~".+......~.:.+..~...~...L..~-.~...~...~
~ ~ i = ·; ~ --~ T T'"T'"T'"~'"~'"T"'T'"T'' '"T'"T"'T'"?"T'"'"?'~'"~ ~'"~ .... ~'... ~ ~..~...;... -~ ~ ~ ~ ~ ~
L.L..~...~..L~ ~ iT ~:::T::T:"T'"""?T'"T'"T'"'"'?'T'"t"'T"'""t'"t'"~'"r" -.t..~..t~.~....~...~..+....4...~...~...~...~..`~...L.~...L......L.L.L.z".~...~..~ ~: ~...L..'.....~ ] ~ ; ~ ~ ~ ~ :, ~ ~
L.~..L..L..~...L..~ ~ ~ ~ ~ T T ~"'~"'T'"~'"~'"T'"v"7'7'"'"T ....... ~'"~-"~'",-~'"~'-"~'?~...~...-..~..+.,.~..+,+...~...~...~...~ ........ L.~,..L.L...L..~...L..L ; = T ~ ~ '~""~'"~"'T'" '"T'"??'T"'~'"T'"?"T ....
~ ~ ! : ~ : T T T T ' T'"T"'~'"*'" '"?"t'"T'"~'"'"'?"*'"*'"~'. ,..~...~..~.' ....... *..~ ~ .f...,...~...~...~...:. : : : : : : ~ ' ~ :~ ~ T T '?'"?"~"?" '"?"t"','"?' "'??'*".+ ....
T'"r"T'"T"' '"T'"?""? "'~"??...~ ....... ~...~...+ .......... ~...~...~...~....~.~...~..~...: ~ ~ ~ . ~ ~ ~ : T '"+'"T'"T'"T'"T ....... T'"T"'~'"T'"~"?'T ....... ?'"'"+""?'"~'"?"~'"~'-.~...+...~.......~...~...~...~ ...... ~ ~,,.L,.L..
~ ~ : ~ : ~ ~ : . : ~ '. : ~ , ~ ~ , ~ : : ' ; : ~ ~ : ~ : ~ T"~ ........... T'"T"~ ...... ?""'"'"'~""
T'"T'"T'"T"'~"'""T"'T'"T"mT'"T'"T'"T ...... ~'"t'"+"'f .......... ~..,+...?.....~-.~...~-.*.-. ~...~...~...~ ........... ~...~ ~ ~. ~...~...~... T , ~ ~ ~ : t ~ I ~ : ; : ~ ~
~...t...~...*......~...~........ ........... ~ ~ ~ ~ ~ ~ ~ ~ : = = : ~ . , . ~ ~ '~"'t"'~ ...... t'''+..,-..'~ ....... ~...~...~...,......~...~ .... ' ' ~ ~ ~ = ' : '
T-..T.--.~..T--~--.T-.-T---T."~--..--T...~...+.`.?T.~-~...t..~--.~-..~.~+-~-~..-~---~.---.-.~--..~..~--.~"-. ,...~...~..,~...~...~...~...~...~...~.. ~ ~ ~ ~ : ~'"T ...... T'"T"T"T"'['T'"T'"T'"~'"r'":'"'7"~'"'m~'"~?"~'"~ ........... ?..~...~....~...,~..,.~...~,..'....,~.,.
-~00 ?'"T'"?"T'"??'~"T" ""T'"~'"~"~'"t'"~"'~"~"?'' '"'~".~...L.~.......~...~...~...~......~...~...~...L..~...L.~...~...~:: ~ :; ~ ~ T"'T'"T ...... T'"T"'T"'T"'T"'T'"T'"~"'~ ....... ~"'??~"'r"?"~'"~'"¥' ...~...~...¥.L.+..~.....,.L..~...
~ ~ ~ ~i ~ ", ~ , ; ~ ~ ~ ~ ~ ~ ~ '. ~ ~ i ~ ~ ~ ~ ~ ~ ~ :., ~ ~ ~ , T T'"T"'T'" "'T'"T'"T'"T'"T'"T'"T'"T'"v"""~""'"ff...~...f-~...?T...~ ........... ¥.~..+...~ ........ ~...~...Z,
r"?"T"T'T"T'"?'~"'~"' ""~'"'?"~'"?~'"~-'~ ; ~ ....... ~'"~'..~...~...~. ~ ~...~...~ ~..4. ~ ~ : . ~ ~ j ~ , '. ~ , ~ . : ~ ~ i ~ ~ ~ : ~ : , ~ '
~ i . ~ 4 ~ ~ ~ : : ' ~ ] : ?"T"' "'?~"'~'"~'"'"'?"~"'?'"t'" "'*...~...~...;.- ~. ~ ..~...~ ~ ~ ~ ~ : ' : : ~ : , . :
~ : : ' : : ~ . "~'"""?"+ ...... ?"?"'?"?"""?"?"~'".-....+...~...+...~.......~.......~...~.., ...~..~...:.......'. : ~ ' : ~ : '. ~ ~ ~ ~ : ~ , ~ : ~ ~ ~ '~'"T'" "'~""Y"~'"?'""'?"~ ........ ~ ....... +.,.~....~...~...
m.?+:~...~...~..,?.~ ..... ~,,.~.,,¥.¥.~...~...~...?,.~......~.+.~...d...~...~...~...~...,...~...~...~...~...[.~..,~..,~...~... :::::::::::::::::::::::::::::::::::::: ::::~:::~:::~:::::::::::::::::::::::::::: "'?~.,,~,,.~...,~....?..~ ........ ?.,?.~..,~...~,,.~..,,~,,,~,,+.,
-6000 -4000 -~000 0 ~000 4000
~EST
E~T
_.
WELL' TBU K-SRD
(725'FSL & 133'FEL,
SEC.17,TgN,R13W,SM)
VERTICAL PROJECTION
0 0
2000
4OO0
60O0
8000
! 0000
! 20O0
257.
I'-
b.
PROJECTION ON VERTICAL PLANE
2S?. -
??,
SCAL£D IN VERTICAL DEPTHS
HORIZ SCALE = 1/2000 IN/FT
///
,,,./
Form to be inserted in each "Active" well folder to check
for timely compliance with our regulations.
, WELL NAME AN~ NUMBER
Date
Required Date Received Remarks
Comple_tion Report 'Y~.. ~ ~ ,~, ~.~ L~.~ ....
.... ~-Pi - ~ ,,,~~,
Mud Log
Core
Chips
.~/d~~., - ,. ~~ ,,,
Core Description , ,
~::~~ ,, ~ M ....
, .......
~~t~o~ su~ver ~~/ ~-~-~ ~,,
, , ,
Drill Stem Test Reports ....
,.. .~4 ~~., ,~ , ~ ~ .
Per&
!1
Produetlon Test Reports
..... ~.o.v ........... g~., ,
Unocal Oil & Gas Divi~"~r ,
Unocal Corporation
RO. Box 190247
Anchorage, Alaska 99519-0247
Telephone (907) 276-7600
UNOCAL
Alaska District
DOCUMENT TRANSMITTAL
May 20, 1986
HAND DELIVER
TO: Bill Van Alan FROM: R.C. Warthen
R. B. Stickney
LOCATION: Anchorage LOCATION: Alaska District
ALASKA OIL & GAS CONSERVATION COMMISSION
Transmitting:
TBU K-8RD
McArthur River Field
Cook Inlet, AK
Sec 19, TgN R13W
AP1 #50-733-20097-01
GCT LIS Tape w/Verif. Listing: 36 to 14,500.2'
Printed Table of Interpolated
Values: 0 to 14,548'
.,
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY OF THIS DOCUMENT
TRANSMITTAL. THANK YOU.
RECEIVED BY:
DATED:
Unocal Oil & Gas Divisi~~
Unocal Corporation \
P.O. Box 190247
Anchorage, Alaska 99519-0247
Telephone (907) 276-7600
UNOCAL
Environmental Group
Alaska District
Nay 6, 1986
Hr. C.V. Chatterton
AK. Oil & Gas Conservation Comm.
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Hr. Chatterton:
SUNDRY NOTICES & REPORTS ON WELLS
K-8RD & K-12RD~ KING SALMON PLATFORM
Attached for your files are two copies each of the subsequent report of
perforation for K-BRD and K-12RD, King Salmon Platform.
Very truly yours,
o~ D. Roberts
Environmental Engineer
cwl
00280
cc' Trading Bay Unit Participants
RECEIVED
MAY- 8 1986
Alaska 011 & Gas Cons. ~misslon
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER []
2. Name of Operator 7. Permit No.
UNOCAL*
3. Address 8. APl Number
P. O. Box 6247 Anchorage, AK 99502 50- 133-20097
4. Location of Well
King Salmon Platform, Cook Inlet
Surface: 725'N, 133'W f/se/cr, sec.
SM
17, T9N, R13W,
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
9. Unit or Lease Name
Trading Bay Unit
12.
10. Well Number
K-8RD
11. Field and Pool
McArthur River Field
' u'"'"' ~ "C];. POC'~
Check Appropriate Box To Indicate Nature of Notice, Report, or Othe¢'l~,~'a'''''' '"
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations ~ Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The f
ollowing Hemlock intervals were perforated in March, 1986:
Bench 0 13776-13786 DIL
Bench 1 13828'13838 DIL
Bench 2 13890-13910 DIL
The following
Hemlock intervals were reperforated:
5-13775 DIL
0-13890
5-14195
Bench 0 1373
Bench 2 1387
Bench 4 1411
Bench 5 **
MAY
,;, 1986
_~k.'.Envir0nmental .GrouF,
* ARCO Alaska, Inc. is sub-operator of the King Salmon Platform.
** Bench 5 was not perforated as planned because the isolation
packer was covered with fill. RECEIVED
MAY- 8 1986
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~::;;'~ ~.. )t~~ TitleEnv i ronmenta 1
The,pace be,ow ~/Commission u,e Roy D. Roberts
/~_~a 011 & Gas (~0n;, C0mmls$~
Anchorage
Engineer Date 5/7/86
Conditions of Approval, if any:
By Order of
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL E~ OTHER
2. Name of Operator 7. Permit No.
UNOCAL*
3. Address 8. APl Number
P. O. Box 6247 Anchorage, AK 99502 50- 133-20097
4. Location of Well
King Salmon Platform, Cook Inlet
Surface: 725'N, 133'W f/se/cr, sec. 17 T9N, R13W
SM
5. Elevation in feet (indicate KB, DF, etc.)
KB 100 feet
I 6.
Lease Designation and Serial No.
12.
9. Unit or Lease Name
Trading Bay Unit
10. Well Number
K-8RD
11. Field and Pool
McArthur River Field
Hemlock Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans ['"] Repairs Made [] Other
Pull Tubing [] Other '[] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following Hemlock intervals will be perforated in March, 1986:
Bench 0 13776-13786 DIL
Bench 1 13828-13838 DIL
Bench 2 13890-13910 DIL
The following Hemlock intervals will be reperforated:
Bench 0 13735-13775
Bench 2 13870-13890
Bench 4 14115-14195
Bench 5 14320-14350
DIL
* ARCO Alaska,
is sub-operator of
the King Salmon Platform.
RECEIVED
Alaska 0il & Gas Cons. Commission
Anch.3rage
14. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~--~-~
Signed
The space below for Commission use
Conditions of Approval, if any:
Annrnv~d hv
Union Oil and Gas 9ivision: Western Region
Union Oil Company ~, ~alifornia
P.O. Box 6247, Anchorage, Alaska 99502
Telephone: (907) 276-7600
union
DOCUMENT TRANSMITTAL
'August 2, 1985
HAND DELIVERED
TO: Bill Van Alen FROM: R.C. Warthen
R. B. Stickney
LOCATION: Anchorage LOCATION: Alaska District
ALASKA OIL & GAS CONSERVATION COMMISSION
Transmitting:
TBU K-8RD
McArthur River Field
Cook Inlet, AK
Sec 19, TgN R13W
API#507332009700
DIL-SFL-SP-GR
DIL-SFL-SP-GR (TVD)
GR (TVD)
GR (Cased)
BHC-GR
BHC-GR (TVD)
CNL-LDL-RHOB-PEF
CNL-LDL-POROSITY
CNL-CCL-GR (Cased)
CNL-CCL-GR (Cased) (TVD) 10800 to 14497
GCT 36 to 14500
11347 to 14349 2" & 5"
11347 to 14349 2"
11300 to 14290 2"
11300 to 14290 5"
11347 to 14320 2" & 5"
11347 to 14320
11347 to 14354
11347 to 14354
10800 to 14497
2II
5"
2" & 5"
2" & 5"
2"
5"
L~T~S~ Tap e w/verif.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY OF THIS DOCUMENT
TRANSMITTAL, THANK YOU.
DATED:
Alaska Oil & Gas Cons. Commission
Anchorage
Union Oil and Gas D.~,,ision: Western Region
_
Union Oil Company tO~ california
P.O. Box 6247, Anchorage, Alaska 99502
Telephone' (907) 276-7600
unlen
April 09, 1985
Mr. Chat Chatterton
AK Oil and Gas Conservation Commission
3001Rorcupine Drive
Anchorage, AK 99501
Dear Mr. Chatterton:
MONTHLY REPORT K-8RD
Attached is the Monthly Report for K-BRD, for your information and file.
If you have any questions, please feel free to contact me at the telephone
number listed above.
LOC/tj
Attachment
Very truly yours,
Lawrence O. Cutting
ENVIRONMENTAL SPECIALIST
RECEIVED
APR 1 1 1985
Alaska Oil & Gas Cons. commission
Anchor~cJe
STATE OF ALASKA ,~,.
ALASKA (~.. _ AND GAS CONSERVATION COl../IlSSION
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
· Drilling well ;~( Workover operation []
2. Name of operator 7. Permit No.
ARCO Alaska, Inc. (as sub-operator for Union) 84-184
3. Address 8. APl Number
P. O. Box 100360, Anchorage, AK 99510 50- 733-20097-01
4. Location of Well
at surface
5. Elevation in feet (indicate KB, DF, etc.)
100' RKB
725' FSL, 133' FEL, Sec.17, TgN, R13W, SM
Leg #4 Conductor #25
King Salmon Platform
6. Lease Designation and Serial No.
ADL 18777
9. Unit or Lease Name
Trading Bay Unit
10. Well No.
K-8RD
11. Field and Pool
McArthur River Field
Hemlock
For the Month of. March , 19 85
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Started sidetrack ~ 0730 hrs, 11/17/84. Drld 12-1/4" hole to 11,662'. Twisted off BHA.
Recovered part of fish when pipe parted ~ 7326'. Plugged and abandoned lower portion of
the well f/6942' - 11,662' w/696 sx Class G. Kicked off at 6942' & drld 12-1/4" hole to
11,387'. Ran, cmtd & tstd 9-5/8" csg. Drld 8-1/2" hole to 14,388'. While attempting to
'log, pipe parted, fish ~ 11,991'. Mix and pumped 400 sx Class "G". Hole packed off,
pipe stuck. Backed off DP ~ 11,331'. 9-5/8" shoe ~ 11,376', (see attached sheet)
13. Casing or liner ru.n and quantities of cement, results of pressure tests
9-5/8", 47.0#/ft, L-80/S-95, BTC csg w/shoe ~ 11,376'. Cmtd w/~50 sx Class G.
14. Coring resume and brief description
None
15. Logs run and depth where run
9-5/8" casing caliper f/11,220' to surface.
Gyroscopic survey f/8000' - surface.
16. DST data, perforating data, shows of H2S, miscellaneous data
RECEJVE'D
None
APR :t ,:~ ]965
Alaska 0H & Gas C0r~s. C0r0rnission
Anchorage
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
'SIGNED Lawrence O. Cutti,ng TITLE Environm~.ntal
SpRnialiS±DATE
04-09-85
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 JMM/MR73 Submit in duplicate
Rev. 7-1-80
MONTHLY REPORT OF DRILLING AND ~oRKOVER oPERATIONS (cont'd)
K-SRD
Item #12:
8?' of open hole. RIH, tagged fish,
w/bit to 11,445'; CBU ' no signs of cmt. pOH.
cmt ~ 11,004'; washed to 11,045'. _
gyro. ND BOP.
ClaSS "G". Tagged
11,294'' Ran 9-5/8" csg caliper log. Ran
well and RR ~ 0930 hfs, 0~/1~/85. Operations suspended'
mixed and pumped 150 sx ClaSS "G". RIM
RIM, mixed and pumped 250 sx
Drld firm cmt to
NU tree° Secured
RECEI'VED
Gas Cons,
Anchorage
i
STATE OF ALASKA
ALASKA{"_, L AND GAS CONSERVATION C~..,MISSION -.
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
· Drilling well~ Workover operation []
2. Name of operator
ARCO Alaska, Inc. (as su'b-operator for Union)
7. Permit No.
8/+-18/+
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 733-20097-01
725' FSL, 133' FEL, Sec.17, TgN, R13W, SM
4. Location of Well
at surface
5. Elevationinfeet(indicateKB, DF, etc.)100, RKB I6'LeaseDesignati°nandserialN°'ADL 18777
For the Month of February/ ,19 85
9. Unit or Lease Name
Trading Bay Unit
10. Well No.
K-8RD
11. Field and Pool
McArthur River Field
Hemlock
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Started sidetrack ~ 0730 hfs, 11/17/8/+. Drld 12-1//+" hole to 11,662'. Twisted off BHA.
Recovered part of fish when pipe parted ~ 7326'. Plugged and abandoned lower portion of
the well f/69/+2! - 11,662' w/696 sx Class 6. Kicked off at 69/+2' & drld 12-1//+" hole 1:o
11,387'. Ran, cmtd & tstd 9-5/8" csg. Drld 8-1/2" hole to 1/+,388'. While attempting to
log, pipe parted. Fishing as of 02/28/85.
13. Casing or liner ru.n and quantities of cement, results of pressure tests
9-5/8", /+7.0#/ft, L-80/5-95, BTC csg w/shoe ~ 11,376'. Cmtd w/750 sx Class G.
14. Coring resume and brief description
None
15. Logs run and depth where run
None
16. DST data, perforating data,, shows of H2S, miscellaneous data
None
R rEIV D.
APR 4 [985
Alaska Oil & Gas Cons, Commission
Anchorage
17. I hereby certify thj~t~the foregoin_~g is true and correct to the best of my knowledge.
SIGNED Lawrence O. Cutting TITLE ENVIRONMENTAL SPECIALIST DATE
04-02-85
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, ahd must be filed in dupl.iea~.e with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 G R U $ / H R 01 :Submit in duplicate
Union Oil and Gas D~,'~*ion· Western Region
Union Oil Company o~ California
P.O. Box 6247, Anchorage, Alaska 99502
Telephone' (907) 276-7600
union
March 26, 1985
Mr. Chat Chatterton
Alaska Oil and Gas Conservation Comm.
3001 Porcupine Drive
Anchorage, Alaska 99501
SUNDRY NOTICE K-8RD & D-3RD #2
Dear Mr. Chatterton:
Attached for your approval is a Sundry Notice of intention for K-8RD, Trading
Bay Unit, and Subsequent for D-3RD #2, Trading Bay Unit.
Please return the approved Sundry Notice to the undersigned.
LOC/tj
Attachments
Very truly yours,
Lawrenc 0~. C~tting
ENVIRONMENTAL SPECIALIST
RECEIVED
2 ? 1985
Naska Oil & Gas Cons. Commission
Anchorage
i STATE OF ALASKA i'
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL
COMPLETED WELL []
OTHER []
Name of Operator Union 0il Company of California
(ARCO Alaska, Inc. is sub-operator)
3. Address
909 W. 9th Avenue, Anchorage, AK 99501
Location of Well
Surface: 725' FSL, 133' FEL, Sec.17, TgN, R13W, SH
Proposed TD: 2586' FNL, 589' FWL, Sec.19, TgN, R13W, SH
5. Elevation in feet (indicate KB, DF, etc.)
6. Lease Designation and Serial No.
12.
7. Permit No.
84-1 84
8. APl Number
50- 733-2d~97-01
9. Unit or Lease Name
Tr~din0 Rn_y I_l_nit
10. Well Number
K-8 RD
11. Field and Pool
McArthur River
Hemlock
RKB 100' MLLW Am 1R777
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other ~ Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
While drilling the 8-1/2" hole on well K-8RD (King Salmon Platform), two (2) fish were left in the well (see
Attachment I for details). The lower portion of the well was plugged and abandoned f/ll,376'-14,388'MD.
Three (3) cement plugs were placed in the well. Plug #1 was spotted with 400 sx Class G ~ 11,963'. Fish #4
was left while spotting this plug. Plug #2 was spotted ~ 11,463' with 150 sx Class G. This plug apparently
fell down hole since it was not tagged on a subsequent bit trip. Plug #3 was spotted ~ 11,463' with 250 sx
Class G. The well will be sidetracked @ 11,400'± to the bottomhole location approved on the Permit to Drill,
after the K-3RD workover.
Attachment #2 contains the only survey information for the plugged and abandoned portion of the well.
Verbal approval was obtained from Lonnie Smith on 2/28/85.
RECEIVED
MAR 2 7 1985
Alaska 0ii & Gas Cons. Commission
Anchorage
Signed I'awrence 0. Cutt~g Title ENVi:'RONMENTAL SPEC IALIST
The space below for Commission use
Date 03-26-85
Conditions of Approval, if any:
Approved by_
~pproved Co~¥
By Order of
COMMISSIONER the Commission
Date ~ ...... '_' ...........
Form 10-403
Rev. 7-1-80
(KJG) SN/027
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
ATTACHMENT I
Sundry Notice and Report on Wells (cont'd)
King Salmon Platform
K-8 RD
The following equipment was left in the well:
Fi sh #3
f/11,972' - 14,360'MD (2388') DPM
(top-down)
4 jts 5" G-105 dril lpipe
30 jts 5" X-95 drillpipe
22 jts spiral heavy weight drillpipe
Dailey jars
13 jts spiral heavy weight drillpipe
crossover
2 spiral steel drill collars
monel stabilizer
spiral steel drill collar
monel drill collar
monel stabilizer
2 monel drill collars
monel stabilizer
Totco ring
bi t sub
8-1/2" bi t
Fi sh #4
f/11,463' - 11,963'MD (500') DPM
( top -down )
16 jts 5" G-105 dril lpipe
RECEIVED
MAR 2 7 ]985
;Naska 011 & 6as Cons. Commission
.... ;Anchorage
Union Oil and Gas Division' Western Region
Union Oil Company/c~'' ..;alifornia
P.O. Box 6247, Anchorage, Alaska 99502
Telephone: (907) 276-7600
union
March 19, 1985
Mr. Chat Chatterton
Alaska Oil and Gas Conservation Comm.
3001Rorcupine Drive
Anchorage, Alaska 99501
SUNDRY NOTICE K-8RD
Dear Mr. Chatterton:
Attached for your approval is a Sundry Notice of intention for K-8RD, Trading
Bay Unit.
Rlease return the approved Sundry Notice to the undersigned.
LOC/tj
Attachments
Very truly yours,
Lawrence O. Cutting
ENVIRONMENTAL SPECIALIST
_Alaska Oil & Gas Coas, G0mmissiofl
....... .. Anchorage., , ....
i .... STATE OF ALASKA
ALASKA rolL AND GAS CONSERVATION CO~wMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL
COMPLETED WELL []
OTHER []
2. Name of Operator Union 0il Company of California
(ARCO Alaska, Inc. is sub-operator)
3. Address
909 W. 9th Avenue, Anchorage, AK 99501
4. Location of Well
King Salmon Platform
Leg #4, Conductor #25
Surface: 725' FSL, 133' FEL, Sec.17, TgN, R13W, SN
Proposed TD: 2586' FNL, 589' FWL, S~c~9~ T9N: R13W~ SM
5. Elevationinfeet(indicate KB, DF, etc.) ~ . Lease Designation and Serial No.
RKB 100' ML[.W ADI 18777
7. Permit No.
84-184
8. APl Number
50- 733-20097-01
9. Unit or Lease Name
Tr'nrl! no ~y
10. Well Number
K-8 RD
11. Field and Pool
HcArthur River
Hemlock
12.
(Submit in Triplicate)
Perforate [] Alter Casing ~ Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans ~ Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Duplicate)
[] Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Qperations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
ARCO Alaska, Inc., proposes to change the casing design on K-8 RD. This change is requested in order to use
readily available pipe which meets or exceeds the pipe approved on the Permit to Drill.
Approved per Permit to Drill:
SIZE WEIGHT GRADE CPLG LENGTH
9-5/8" 47# N-80 BTC 13,006'
7" 29# N-80 BTC 2257'
MD (TVD) MD (TVD)
37'(37') - 13,043'(8800')
12,743'(8615') - 15,000(10,004'
Requested change:
9-5/8" 47#
9-5/8" 47#
7" 29#
7" 32#
S-95 BTC 4640'
L-80 BTC 6699'
L-80 BTC 3074'
S-125 BTC 731'
14. ~ hereby ce~re~and correct to the best of my ~nowledge.
Signed L~'wrence O. Cu±±i nq Title ENVIRONMENTAL SPEC I'ALI ST
The space below for Commission use
37'(37') - 4677'(3650')
4677'(3650') - 11,376'(7740')
11,076' (7559') - 14,150'(9410'
14,150' (9410') - 14,881'(9850')
RECEIVED
Anchorage
Date
Conditions of Approval, if any:
Approved by
~! LOtIIiIE il. $11llt
Form 10-403
Rev. 7-1-80
~'pprev?¢:/ Cop7
BY Order of
COMMISSIO~fi~ the Commission
(~JG) SN/Uzu
Date
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
Union Oil and Gas Division: Western Region
Union Oil Company~'c~'' ,.;alifornia
P.O. Box 6247, Anchorage, Alaska 99502
Telephone: (907) 276-7600
union
March 4, 1985
Mr. Chat Chatterton
AK. Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Chatterton:
MONTHLY REPORTS K-8 & K-8RD
Attached are the Monthly Reports you requested for December & Oanuary on K-8,
Trading Bay Unit for your information and file.
If you have any questions, please feel free to contact me at the telephone
number listed above.
Very truly yours,
Lawrence O. Cutting
ENVIRONMENTAL SPECIALIST
LOC/tj
Attachments
RECEIVED
MAFl 0 8 1985
~as Cons. Commission
Anchorage
STATE OF ALASKA ".
ALASKA(L,L AND GAS CONSERVATION C~ .,MISSION
MONTHLY REPORT OF DRILLING Al,ID WORKOVER OPERATIONS
· Drilling wellX[~] Workover operation []
2. Name of operator 7. Permit No.
ARCO Alaska, Inc. (as sub-operator for Union) 84-184
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 733-20097-01
4. Location of Well
at surface 725' FSL,
5. Elevation in feet (indicate KB, DF, etc.)
100' RKB
133' FEL, 5ec.17, T9N, R13W, SH
6. Lease Designation and Serial No.
ADL 18777
For the Month of Januar), ,19 85
9. Unit or Lease Name
Trading Bay Unit
10. Well No.
K-8RD
11. Field and Pool
McArthur River Fi eld
Hemlock
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Started sidetrack ~ 0730 hrs, 11/17/84. Drld 12-1/4" hole to 11,662'. Twisted off BHA.
Recovered part of fish when pipe parted @ 7326'. Plugged and abandoned lower portion of
the well f/6942' - 11,662' w/696 sx Class G. Kicked off at 6942' & drld 12-1/4" hole to
11,387'. Ran, cmtd & tstd 9-5/8" csg. Drld 8-1/2" hole to 12,402' as of 01/31/85.
13. Casing or liner ru.n and quantities of cement, results of pressure tests
9-5/8", 47.0#/ft, L-80/S-95, BTC csg w/shoe (~ 11,375'. Cmtd w/750 sx Class
14. Coring resume and brief description
None
15. Logs run and depth where run
None
6;. DrST, data.,, perforating data,, shows, o,f, Hi25,, m,i~cell'aneou~ data
None
RECEIVED
17. I here~e foregoing is true and correct to the best of my knowledge.
SIGNED Lawr,ence 0. Cu±± i nq TITLE "Env i ronmen±a I
SpecialiStDATE
03-01-85
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 .GRU4/MR05 Submit iN duplicate
R~v 7.1 .RI"'1 'l :
L STATE OF ALASKA ,,,
' ALASKA .- AND GAS CONSERVATION C(~, .MISSION
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
1. Drilling wellX[X] Workover operation []
2. Name of operator 7. Permit No.
ARCO Alaska, Inc. (as sub-operator for Union) 84-184
3. Address 8. APl Number
P. O. Box 100360, Anchorage, AK 99510 50- 733-20097-01
4. Location of Well
at surface
725' FSL, 133' FEL, Sec.17, TgN, R13W, SM
5. Elevationinfeet(indicateKB, DF, etc.) 6. LeaseDesignationandSerialNo.
100' RKB ADL 18777
9. Unit or Lease Name
Trading Bay Unit
10. WellNo.
K-8RD
11. Field and Pool
McArthur River Field
Hemlock
For the Month of. December ,19 84
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Started to sidetrack well ~ 0730 hrs, 11/17/84. Drilled 12-1/4"
Twisted off BHA (top of fish ~ 10,012'). Fishing as of 12/31/84.
hole
to 11,662'.
13. Casing or liner rgn and quantities of cement, results of pressure tests
None
14. Coring resume and brief description
None
15. Logs run and depth where run
None
RECEIVED
6. DST da:t:a, ;p~erfo:rating data, sh,ows of H2S, ,m.iscel laneous data . ' .......... . ~ ......... ~R ..0~ 8,,,~.=5 ....................
None
Alaska 0il & Gas Cons. Commission
Anchorage
17. I hereby ~regoin.~g is t_rue and correct to the best of my knowledge.
SIGNED L~wrence O: CL! .q-q-. !.n..~ TITLE En\,i ronmen.+~_
Specfa!is~ATE
05-01-85
NOTE--Report on this form .is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 GRU4/MR04 'Submit in duplicate
Rev. 7-1-RO
Union Oil and Gas ~ !on' Western Region
Union Oil Company of California
P.O. Box 6247, Anchorage, Alaska 99502
Telephone' (907) 276-7600
unlan
January 21, 1985
Mr. Chat Chatterton
Alaska Oil and Gas Conservaion Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
SUNDRY NOTICE K-8RD
Dear Mr. Chatterton:
Attached for your approval is a Sundry Notice for K-8RD, Trading Bay Unit.
·
Please return the approved Sundry Notice to the undersigned.
LOC/ti
Attachments
Very truly yours,
Lawrence O. Cutting
ENVIRONMENTAL SPECIALIST
~las~a Oil & Gas Cons. 6omm~Sslon
Anchorage
(' STATE OF ALASKA i'
ALASKA rol'L AND GAS CONSERVATION CO MMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL :[~
COMPLETED WELL []
OTHER []
2. Nameof Operator Union 0il Company of California
(ARCO Alaska, Inc. is sub-operator)
3. Address
909 W. 9th Avenue~ Anchorage, AK 99501
4. Location of Well
Surface: 725' FSL, 1:3:3' FEL, Sec.17, TgN, RI:3E, SM
Proposed TD: 2586' FNL, 589' FWL, Sec.19, TgN, RI:3W, SM
5. Elevation in feet (indicate KB, DF, etc.)
RKB 100' MLLW
6. Lease Designation and Serial No.
ADI. 1~777
7. Permit No.
84-184
8. APl Number
50- 7;~3-20097-01
9. Unit or Lease Name
Tr~dlno R~, IIn~-
10. Well Number
K-8 RD
11. Field andPool
McArthur River
Hemlock
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF'
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing
Stimulate [] Abandon Xj~ Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
[] Other ~]~ Pulling Tubing []
Pull Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
While drilling (King Salmon Platform) well K-8RD, two (2) fish were left in the hole (see Attachment I for
details). The lower portion of the well was plugged and abandoned f/6942' - 11,662'MD.
A cement plug was placed f/6942' - 7320'MD (378'). The well was kicked off @ 6942'MD and is presently
drilling to the bottomhole location approved on the Permit to Drill.
Verbal approval was obtained from Lonnie Smith on 01/01/85.
RECEIVED
JAN 2 ]985
Alaska 0/I & 6as' Cons. COmmission
Anchorage
Signed~~"'0 · Cutting
The space below for Commission use
to the best of my knowledge.
Tit~e ENVI~RONMENTAL SPECIALIST
Date J01-21-85 ·
Conditions of Approval, if any:
Approved by
~'q:','p rovea Copy
Returned
By Order of
COMMISSIONER the Commission
Form 10-403
Rev. 7-1-80
[EJb) bN/UU~
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
Sundry Notice Attachment #1
KING SALMON PLATFORM
WELL K-8 RD
The following equipment was left in the well:
Fish #2
f/7326' - 8873'MD (1547')
(TOP-DOWN)
I jt 5" drillpipe
crossover
accelerator
4 steel drill collars
jars
bumper sub
triple connection
crossover
4-1/2" ~F pin top
washpipe extension
11-~/4" OD guide
9 jts 5" drillpipe
Dailey jars
~4 jts spiral heavy weight drillpipe
Fi sh #1
f/11,373' - 11,662' (289')
(TOP-DOWN)
1 jt spiral heavy weight drillpipe
keyseat wi per
crossover
2 spiral steel drill collars
stabilizer
1 spiral steel drill collar
crossover
1 Monel drill collar
stabilizer
1 Monel drill collar
Teleco drill collar w/GR
crossover
stabilizer
1 Honel drill collar
lead drill collar
stabilizer
12-1/4" bit
Attachment #2 contains the only survey information for the plugged and abandoned portion of the well.
SN/OOS:tw
RECEIVED
JAN 2
Alaska Oil & Gas Cons. Commission
Anchorage
MEMORA: 4DUM
Sta' e of Alaska
TO:
TitRU: Lonnie C. Smith
Commis s ioner
FROM:
Bobby :Foster
Petroleum Inspector
ALASKA_OIL AND GAS CONSERVATIOli COMMISSION
C. V;~Z~er~on DATE: November 13, 1984
Chai~m~5 ~ FILE NO:
TELEPHONE NO: 105/t
SUBJECT:
Witness BOPE Test
On ARCO's King Salmon
Platform Well K-8RD
Sec. 17, T9N, R13W, SM.
Permit #84-184
S_a_turday, November 10, 1984: I traveled this date from
ARCO's W01f Lak'e"""~2 to XR"-~O's King Salmon Platform to
witness the upcoming BOPE test on Well K8RD.
.S~nday, No.vember 1!,_~:198~4: Standing by.
~p~day_, Novembe..r. ~..2 ,.. .1984: The BOPE test began at 6:00 a.m.
and was concluded at 8-30 a.m. As the attached BOPE test re-
port shows there were no failures.
In summary, I witnessed the BOPE test on ARCO's K8-RD.
02-O01A(Rev. 10/79)
O&G
~'/84
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION CO~4ISSION
B.O.P.E. Inspection Report
Operator. ~Z///cO
Date
Well ~ ~
Representative
Permit ~J ~-
Location: Sec / 7 T¢/~/Rf3f~M -~ 9 ~//~Casing Set @ /~J ~ ft.
Drillin, Contractor ~~-~~Ri~ 'J,:~ Representativ _~~ ~,,~2~_~.~.~2-~'j
General HousekeepingO_~____Rig
Reserve Pit_
Mud Systems Visual Audio
Trip Tank
Pit Gauge
Flow Monitor
Gas Detectors ~.~
BOPE Stack
Annular Preventer
Pipe Rams
Blind Rams
Choke Line Valves
H.C.R. Valve
Kill Line Valves
Check Valve
Test Pressure
Test Results: Failures
ACCU~LATOR SYSTEM
Full Charge Pressure ~~
Pressure After Closure~ ,
Pump incr. clos. pres. 200 psi
Full Charge Pressure Attained:
Controls: Master ~e~
psig
psig.
mi~ sec.
V
min /'0 sec.
psig.
Remote ~e~ Blinds switch cover
Kelly and Floor Safety Valves
Upper Kelly ~ Test Pressure
Lower Kelly / Test Pressure
Ball Type / Test Pressure
Inside BOP / Test Pressure
Choke Manifold L~ Test Pressure
No. Valves
No. flanges ~ .
Adjustable Chokes /
~ydrauicaily..operated choke /
Test Time~'~ ~/~hrs.
Repair or Replacement of failed equipment to be made within -' days and Inspector/
Commission office notified.
Remarks: U~./~t,) ~ ~t~ ~'~°o'~A ~.~4 _~*~ ~"~ '-'-
_~,,z. ?,,,'%, ,~ g .~ c c.~ ~ ~/~/~ .' i,~ ... / ~ .~.,,,,~,~~.
Distribution
orig. - AO&GCC
cc - Operator
cc - Supervisor
October 19, 1984
Mr. Lawrence O. Cutting
Environmental Technician
Union Oil Company of California
P. O. Box 6247
Anchorage, Alaska 99501-0247
Re: Tradimg Bay State K-8 RD
Union Oil Company of California
Permit No. 84-184
Sur. Loc. 725' FSL, 133' FEL, Sec. 17, T9N, R13W, SM.
Btmhole LOc. 2586' FNL, 589' F~L, Sec. 19, T9N, R13W, SM.
Dear Mr. Cutting:
Enclosed is the approved application for permit to drill the
above referenced well.
If coring is conducted, a one cubic inch chip from each foot of
recovered core is required. Samples of well cuttings and a mud
log are not required. A continuous directional survey is
required as per 20 AAC 25.050(b)(5). If available, a tape
containing the digitized log information shall be submitted on
all logs for copying except experimental logs, velocity surveys
and dipmeter surveys.
Many rivers in Alaska and their drainage systems have been
classified as important for the spawning or migration of
anadromous fish. Operations in these areas are subject to
AS 16.05.870 and the regulatioms promulgated thereunder (Title 5,
Alaska Administrative Code). Prior to commencing operations you
may be contacted by the Habitat Coordinator's Office, Department
of Fish and Game.
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Article 7 and.the regulations promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter 70) and by the
Federal Water.Pollution Control Act, as amended. Prior to
commencing operations you may be contacted by a representative of
the Department of Environmental Conservation.
To aid us in scheduling field work, please notify this office 24
hours prior to commencing installation of the blowout prevention
equipment so that a representative of the Commission may be
present to witness testing of the equipment before the surface
casing shoe is drilled. Where a diverter system is required,
please also notify this office 24 hours prior to commencing
equipment installation so that the Co~ission may witness testing
before drilling below the shoe of the conductor pipe.
In the event of suspension or abandonment, please give this
office adequate advance notification so that we may have a
witness present.
Ve~r~ truly yours,
: ~i, ~:~~~ .._ ~~tII? . t ,./. . ...
C. V. Chatterton
Chairman of
Alaska Oil and Gas Conservation Commission
BY ORDER OF THE CO~IISSION
lc
Enclosure
cc: 'Department of Fish & .Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
ARCO Alaska, In~~
Post Office Box 100360
Anchorage, Alaska 99510
Telephone 907 276 1215
October 18, 1984
Mr. H. Hedlund
State of Alaska
Alaska Oil & Gas Conservation
Commi s s i on
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT' K-8 RD Permit to Drill
Dear Mr. Hedlund,
You raised a question concerning my calculation of anticipated
surface pressure on the K-8 RD Permit to Drill. After reviewing
that matter, I came to the conclusion that the previous method of
calculating anticipated surface presures is not justified for the
King Salmon platform, within the Trading Bay Unit. Previously,
the maximum bottomhole pressure was-extrapolated to surface using
a gas gradient (at constant volume). The following equation was
used:
Example #1 PiV1 = P2V2
T1 T2
G/O i~%£~F~CE P1 = P2 ' Where V1 = V2
T1 T2
P1 = P2 T1
U?9ooZ~-v~ T2
I = Surface
2 = Bottomhole
P : Pressure (psi)
V = Volume
T : Temperature (°R)
This equation may be justifiable in areas where a gas zone will
be penetrated but to date, a gas cap has not been detected in the
Hemlock formation (target formation at total depth) and none is
anticipated. Realizing this, to assume a full column of gas to
surface under emergency conditions is, although a worst case,
RECEIVED
OCT 191 ,
A~aska 0il & Gas Cons. Commission
Anchorage
ARCO Alaska, Inc. is s Subsidiary of AtlanticRichfieldCompany
Example #2
Mr. H. Hedlund
October 18, 1984
Page 2
highly improbable. Under this worst case, using the above gas
law, the maximum surface pressure anticipated would be-
P1 = P2 T1
T2
= 4000 ps ir~ 80+460
'180- ).J
= 3375 psi
Since I do not think this is possible (if I did, we would be
using 5000 psi BOP equipment), I would like to offer an
alternative calculation of maximum surface pressure anticipated
from the Hemlock formation. One known fact of the Hemlock crude
is that it does contain solution gas which has a bubble point of
1700 psi. This tells me that if a full column of crude is
brought to the surface and the well is shut in, that over time,
gas will break out of the crude (displacing crude into the
formation). This will create a gas column at the top of the well
until the gas/oil interface is at 1700 psi (surface pressure plus
gas column pressure).
Upon initial shut in, the surface pressure would be equal to
bottomhole pressure minus a full column of crude. As the gas
breaks out of the oil and displaces the crude, the surface
pressure will increase until this process stops. The following
derivation estimates what the maximum surface pressure would be
under these "ideal" conditions:
Ps + Phg + Pho = PBH
Phg = (.08 psi/ft)Y
Ph° = (.36 psi/ft)X
X + Y - 9900 ft
PG/O
Ps + (.08 psi/ft )Y = 1700 psi
(.08 psi/ft)Y = 1700 psi - P
s
Y = 1700 psi -
.08 psi/ft
P
'.'08 psi/ft
RECEIVED
OCT 2 a
Alaska Oil & Gas Cons. Commission
Anchorage
Mr. H. Hedlund
October 18, 1984
Page 3
Ps = PBH - Phg - Pho
= 4000 psi - (.08 psi/ft)Y - (.36 psi/ft)X
Where,
Substituting for X,
Substituting for Y,
X = 9900 ft - Y
Ps = 4000 psi - (.08 psi/ft)Y - [(.36 psi/ft) (9900 ft-Y)]
= 4000 psi - .08 psi/ft x Y- 3564 psi + .36 psi/ft x Y
= 436 psi + .28 psi/ft x Y
= 436 psi + 28 psi/ft F17oo psi - Ps'"~
L.08 psi/ft ~08 psi/
= 436 psi + 5950 psi - 3.50 P
4.5 Ps = 6386 psi s
Ps = 1419 psi
Ps = Surface Pressure
Ph = Hydrostatic Gas Pressure g
Pho : Hydrostatic Oil Pressure
PBH = Bottomhole Pressure
Y : Gas Column (ft)
X = Oil Column (ft)
PG/O = Pressure at Gas/Oil Interface
To further back up this alternative, an exploration well (W.F.U.
#3) was drilled near the K-8RD bottomhole location in 1966. A
drill stem test was performed on the Hemlock @ 9600'TVD with a
bottomhole pressure of 4290 psi. The shut-in drillpipe pressure
after flowing 912 bbls of oil (no gas or water) was 1000 psi.
Another well on the platform, G-30, has one of its dual
completions in the "G" sand @ 8750'_+TVD. The original bottomhole
pressure was 3800 psi+. The well made 10% H20/90% oil (no gas)
and has been shut-in for over a year. Its surface pressure is
1200 psi despite the lower bottomhole pressure and 10% water cut!
As I mentioned before, the worst case for maximum surface
pressure to occur is when a gas sand is cut. The permit to drill
suggests that the maximum surface pressure will be some function
of the maximum bottomhole pressure (usually near TD). This is
not true if a gas sand is cut, even if it is well above TD.
RECEIVED
OCT 2 6
~,last~a Oil & Gas Cons. CommissJ~
Anchorage
Mr. H. Hedlund
October 18, 1984
Page 4
For instance, on K-8RD, there is a possible gas sand at 6300'TVD.
This sand has a low permeability and is normally pressured (2700
psi±) so its potential to cause an emergency situation is
limited. But it is a gas sand, so under worst conditions,
Example #1 could apply. Under these conditions, the maximum
,
surface pressure would be'
P1 = P2 T1
T2
= 2700 psi F(80120 + + 460460)~
= 2514 ps~
In any event, our 3000 psi BOPE should be adequate enough to
handle any anticipated occurrence in the King Salmon area. As
one last comment, I would like to point out that we use 3000 psi
BOPE on all our workovers and our highest brine (mud) weights are
8.8 ppg±. During drilling operations, our mud weights will be
10.5 - 11.5 ppg± to control shales and coal seams.
If you have any more questions regarding this matter, please call
me at 263-4962.
Sincerely,
K. d. Grimes
Drilling Engineer
ENDORSED BY'
T. L. Fithian
Area Drilling Engineer
DATE'
KJG/80'tw
xc' T. L. Fithian
RECEIVED
OCT 2 6198:
Alasl(a Oil & Gas Cons. Commission
Anchorage
Union Oil and Gas ~: ~sion: Western
Region
Union Oil Company of California
P.O. Box 6247, Anchorage, Alaska 99502
Telephone: (907) 276-7600
union
October 12, 1984
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, Ak. 99504
TRADING BAY UNIT
State of Alaska
McArthur River Field
Application to Drill and Complete
TBUS K-8 Rd., ADL-18777
Gentlemen:
Arco Alaska, Inc., as sub-operator of the King Salmon Platform, anticipates a
spud date of October 18, 1984 on TBUS K-8 Rd.
Your timely approval on the attached Permit to Drill on K-8 Rd would be
appreciated.
Very truly yours,
Lawrence O. Cutting
Environmental Te~
cwl
Attachment
RECEIVED
OCT
A~aska Oil & Gas Oons. Oemmission
Anchors.ge
ALASKA OIL AND GAS CONSERVATION,COMMISSION / 3001 PORCUPINE DRIVE
/
October 12, 1984
ADMINISTRATIVE APPROVAL NO. 80.48
Re.. The application of Union Oil Company of California,
operator of the Trading Bay Unit, to drill, complete, and
produce the Trading Bay Unit No. K-8RD, No. G-29, and No.
D-43 wells as part of the pressure maintenance project
approval by Conservation Order No. 80.
Mr. Robert T. Anderson
District Land Manager
Union Oil Company of California
P. O. Box 6247
Anchorage, Alaska 99502-0247
Dear Mr. Anderson:
The applications were received on October 12, 1984 and all
stated that the drilling, completion, and production of the
Trading Bay Unit No. K-8RD, No. G-29, and No. D-43 wells will
provide crestal final withdrawal points in the Hemlock Pool and
increase ultimate recovery from the Hemlock Pool.
The Alaska Oil and Gas Conservation Commission hereby
authorizes the drilling, completion, and production of the
three referenced wells pursuant to Rule 5 of Conservation Order
No. 80.
Yours very truly,
Harry 9. Kugl~r, '
Commissioner
BY ORDER OF THE COMMISSION
be:l
Union Oil and Gas [j' 'sion: Western Region
Union Oil Company of California
P.O. Box 6247, Anchorage, Alaska 99502
Telephone: (907) 276-7600
union
Robert T. Anderson
District Land Manager
'October 11, 1984
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, Alaska 9~504
TRADING BAY UNIT
State of Alaska
McArthu'r' River Field
Application to Drill and Complete
TBUS K-8 Rd., ADL-18777
Gentlemen:
Union Oil Company of California, as operator of the Trading Bay Unit, hereby
requests approval to redrill, complete and produce Trading Bay Unit State K-8
in the Hemlock Oil Pool Pursuant to Rule 5, Conservation Order No. 80.
This proposed completion at a crestal final withdrawal point will result in
additional recovery of Hemlock Production.
Your approval of this request will be appreciated.
Very truly yours,
sk
cc: C. Case
R. Warthen
I:l I:: C E iV E D
Alaska Oil & Gas Cons. Commission
Anchorage
ALAS~
STATE OF ALASKA .]
,.)IL AND GAS CONSERVATION C~,,¢IMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work.
DRILL
REDRILL
DEEPEN
lb. Type of well
EXPLORATORY []
DEVELOPMENT OIL [~
DEVELOPMENT GAS []
I
SERVICE [] STRATIGRAPHIC ¢ I
SINGLE ZONE I-~X ~
I
2. Name of operator
Union Oil Company of California (ARCO Alaska, Inc. is sub-operator)
3. Address
909 W. 9th Avenue, Anchorage, Alaska 99501
4. Location of well at surface
725' FSL, 133' FEL, Sec.17, T 9N, R13W, SM
At top of proposed producing interval
2400' FNL, 1400' FWL, Sec.19, T 9N, R13W, SM
At total depth~ML'
2586' F~; 589' FWL, Sec.19, T 9N, R13W, SM
5. Elevation in feet (indicate KB, DF etc.)
RKB 100' NWL
6. Lease designation and serial no.
ADL 18777
12. Bond information (see 20 AAC 25.025) Federal Insurance Company
Type Statewide Surety and/or number ¢?~0] 1 -q4-/-+0
13. Distance and direction from nearest town 14. Distance to nearest property or lease line
Kenai NW 24 miles 589 feet
16. Proposed depth (MD & TVD) 17. Number of acres in lease
15000' MD, 9900' TVD feet 1902
19. If deviated (see 20 AAC 25.050)
KICK OFF POINT 2675 feet. MAXIMUM HOLE ANGLE
20. Anticipated pressures
52 o I (see 20 AAC 25.035 (c) (2)
9. Unit or lease
Trading Bay
10. Well number
K-8 RD
11.Fieldand pool
McArthur River
Hemlock
Amount $500,000
15. Distance to nearest drilling or completed
I K-19 well @ 5780'MD = 152 feet
18. Approximate spud date
10/15/84
2775 psig@__ Surface
4000 psig@ 9900 ft. TD (TVD)
SIZE
Hole / Casing Weight
Exi sti ng~ 24"
Existin~ 13-3/8" 61.0#
12-1/4"/ 9-5/8" 47.0#
8-1/2" ~ 7" 29.0#
/
22. Describe proposed program:
Proposed Casing, Liner and Cementing Program
CASING AND LINER
Coupling Length
Weld
BTC
N-80 BTC 13006'
N-80 BTC 2257'
Grade
Drive Pi~e
J-55
SETTING DEPTH
MD TOP TVD
365' 35'
2536' 35'
I 35'
35'
37' ~ 37'
12743' I 5'
~861
MD BOTTOM TVD
400'1 400'
2571' 2275'
13043'] 8800'
15000'1 10004'
I
QUANTITY OF CEMENT
(include stage data)
N/A
O00sxClass G&4OOsxNeat G
750 sx Class G
400 sx Class G
ARCO Alaska, Inc., proposes to plug and abandon the exi,sting K-8 wellbore below 2900'MD. 9-5/8" casing will be
cut ~ 2850'MD and pulled. After spotting a cement plug f/2675' - 2850'MD, the well will be directionally
drilled to the proposed bottom hole location in the Hemlock. The well will be completed with a 4-1/2" x 3-1/2"
completion assy, a packer, and a surface controlled SSSV.
A 13-3/8", 3000 psi, RSRA BOP stack will be installed and tested to 3000 psi. The annular preventer will be
tested to 1800 psi.
K-19 will be 152' away from K-8RD ~ 5780'MD. There are no other wellbores closer than 152' anywhere along the
proposed well course (below the KOP).
23. I hereby certify~f~at the foregoin_qis true and correct to the best~i~wledge
SIGNED ~ ¢ C~ ~TITLE ENVIRONMENTAL TEcHNICIANDATE
The space b~E'~ i-~-n-~f~TT-~t6 ~
CONDITIONS OF APPROVAL
Samplesrequired Mud Iogrequired ] DirectionalSurveyrequired IAPi n~b~r
[]YES I-lNG []YES []NO []YES •NO. 50- -20097-01
Permit number Approval date
84-18~---~ I~ ./'1]0/19/8_4 ~ :1 SEE COVER LETTER FOR OTHER REQUIREMENTS
--~ / /-~-' ~-'/7'1
A PPROVEDBY / /~'~///~~~~~,~OMMiSSiONER DATE October 19, 1984
k ~' ' /^ ~ ~/"/~~ by order of the Commission
Form 10-401 GRU1/PD19 --- ' / / Submit in triplicate
Rev. 7-1-80
i
25. iUELL/NO, K-8 RI) PRdPOSED
PLAI'FOR~it C001{ I[NLI~T. ALASKAI
PSTO~K. IIC. i i ..... : -i
........ , ~ : -
!
~
NORTH
SO00:
PR~POS D[ E ION:
.... S__j7Z..DEG ..j 5 N W
.(FR M EO0)
i
I
. .
807'1
i
I
~000
4OOO
I
_{
517'4.
527';
~000
2000 1 000 0
SURFACE LOCATION,
72~' FSL, 133'~FEL
SEC. 17. T 9N. iR13W
t 4.
i
st~qFAC;~
~161
i
no.
·
40?0 IDI~P-1 818
MiNi '
CALCULATION OF LEAST DISTANCE
BETWEEN WELLS
WELL 1 --- ARCO ALASKA, INC.
FILE 2111 LEG 4, SLOT 25, WELL NO: K'8 RD PROPOSED
KING -SALMON' PL~TFRM~, 'J'-J~O~" ~Pj~nK INLET,ALA.:.KA~-~';' .............................................. . . '~
I::00RDINATES: 109.11 N 7.82 W KB = 100.
WELL"2" ~RO0 AL~';'"iNO~ ..............
FILE 240 KIN~ SALMON PLTFM., WELL NO: K-I~, GMS dOB NO: A281G0234
COOK INLET, KENAI, ALASKA
' COORDINATES: 82,81 N ' 4'8. M2 E J~B" = ..... ~.~
·
RANGE OF MEASURED DEPTH
WELL 1
WELL 2
.
2685. ~.,..T~I~T.O ,8~. FT WcITH A 10.0 FT INTERVAL
2730. ~0 :~~~"~j~~FT INTER~A~
' DEPTH ~J~~ ~ ~ ~ :~'~' ~~ ~ ~
WE~U_ 1
WELL 2
J5'78i'), 09 .... 4~332.41 -'
5730. O0 4447.56
i579.92 S
1517.40 S
2?65.52 W
2689.07 W
. -
::.DISTANCE BETWEEN POINTS IS 151.69 FT
o..
·
315G ~
-~oe-- ....
i. ,
2801
51(i;I
25
284,1
2317'
2510'
2432
4327*"
41 21
3922
44~18
I
47~9
~ P'-) .... RKB # I
3774. lO
~250,0~... 400~. 40
~260. O~ 4012.56
5270.09 4018.71
5280.09 4024.8&
5290. O? 4031.01
5300.09 4037.16
5310. 09 4043.31
5320.09 4049.46
5330. O? 4055./., 1
. _3.4__0. ...... 4061.76
STATION ON WELL 1
1483.10 S
1484.86 S
1486.62 S
1488.38 S
1490.14 S
14.91.90 S
CALCLILATION OF LEAST DISTANCE
BETWEEN WELLS
2342.81W
2350.50 W
2358.19 W
2365.87 W
2373.56 W
2381.24 W
CLOSE.ST STATION ON WELL-2
MD 'TV[, NS .......... Ew
RKB # 1
D I STANCE
............ BETWEEN
STAT I ON.':
5210 00 4106.54 1318.07 S · 2351.56 W
5220.00 4113.10 1322.18 S. 2357.87 W
5230.00 4117./.,6 1326.2.9 S 2:364.22 W
5240. O0 412/.,. 22 133:0 .41 S 2370..~._ ._, W
5250.00 4132.78 1:3:34.52 S 2376.88 W
1 .-'F.,'? ~. 5~
177.73
196.0~
177'4.2'.:.
192.5';
1 ?0.8~
5350.09 4067.~1
5360.09 4074.07
5370.0? 4080.22
5380.0? 4086.-37
53?0.0? 4092.52
5400.0? 40?8.67
..
_. _
5410.0.9 4104.82
5420.0? 4110..97
5430.0? 4117.12
5440.0? 4123.27
5450.0~ 4127.42
5460.0~ 4135.58
5470.0~ 4141.73
5480,0~ ii'~' 4147,88
5490.0~!~:!~ 4154.03
5510. t 66.33
48
5520.0~~ 172,
5540.0e?~:~'~ 4~e4.78
5550.09'
14-93:. 66 S 2388.93 W 52/.,0.00 413_-:.9.41 1:338.70
14.95.42 S 2376.61 W 5270.00 4146.04 1342. :3.9
14.97.18 S 2404.3:0 W 5280.00 4152./.,6 1347.0,9
1498. ?4 R 2411..98 W .~'.--".~o_~. .. 0o. 415?. .-. :.~'~ 1351 .27
1500 70 S 241 ?/. 67 W .=," - . - .
. ._ ._-,(.)0.00 41/.,5 ?2 I ~s.~ 46
1502.46 S ..... 2427. :35 W 5:30o. 00 4165. '~2 1355.46
. .
1504.22 .:; 24R._ 04 ~ . . .
~ ~.=,. W .=,~10.¢)0 4172 54 135~) /.,5
1505.~,~-~;, 244,~,~3 W ~ ~ , 5320.00 4179. 17 13/-.3. :34
i._,~4.7~ ~..~. i., ~ -' ,;~ ~,70-. 00 -. -' -~l~. 1~~ 1s84.40
151~,55 S 2488,84 W 5380.00 ~' '4218,7:3 1388,40
1518, 31._.c' 2496, fi2 ~ 5:3?0, 00 4225, 2? 13f~2, 40
1520,07 S 2504,21 W 5400, 00 4231,85 1396.40
c.'' 2o¢":' 0? W 1~ 2(:
._i ~1 i_i ,_i . .
S o.-~,-, 9 :-~ ¢) W ~ .~,
z..-_, ,_-,; · . . ._ :_'
':-'.., 23:95.51 W 1,_,...'-'5.91..
...........
c. 2401.72 W 1:34.
S ' 2407.93 W 182.7/.'
S 24(:.)7..93 W 181.21
........
S. 2414.13 W 179./.,::
S 2420. :2:4 W 178.2(."
S' . ~.--,,:.'"""">/.:,. 55 W .... 17/.,, 7z
· ~ 24:32.76 W 175.3::
.,:.4.:,c,. 97 W 173.
'-:o 244.=,_ . 37 W 172.62
S 2451.77 W 171.4.':
S 2458.17 W 17(3. '2:;;.-
S 24/_-,4.57 W 16.9. OZ
....
c. 2470 98 W 1/-,7 ::,':
:_,' · · _...
1521.83 S 2511.90 W
1523.57 R 2517.58 W
1525.35 .. ¢' 2527.27 W
1527.11S 2534.?5 W
1528.87 ..,o 2542./-.4 W
1530.63 $ ' 2550.32"W
153:2 3:9 S ~553 01W
1534.15 S 2565.6? W
1535 ?1 c;' 2573 ~o W
1537.67 R 2581.06 W
5410. 00
5420.00
5430.00
5440. O0
5450.00
5460.00
5470.00
5480.00
5490. O0
5500.00
4238.41 1400.40 .c.;._ 2477 . ._,°°W,_, 1/.,/.,. 7~
4244.';77 1404.40 S '-""':"-" 7:3 W 1~..6;
. -- ...................... "/ ,.- ~ m_, 'm'. .................... ,
4251..=,3 140:::. 40 S 2490 .1 o,_, W ] . /-_, ~._
47.=,R~_ _. A.9_ 1412.40 ._,c. 24?6.58 W 16:3.64
4264.65 1416.40 ~c; - 2502.?::: W 1/.,2.6/:
4271.21 14'~)~'Si--'~ ' 2507.31 W " 1/_-.i~6?
4277· 77 1424.62 S 2515.64 W 160.7
42:34.._°,'~'._, 1428.73 R 2521..97 W 15?. :3(:
42?0. ?0 1432.84 S' --252:::.3:0'W ' - 158.
42'p7.46 1436..°5 $ '25:34.63 W 158.1C
5560.09
5570.0?
5580.0?
5590.0~
:':.~600.09
· . .
:?:: ~620.0~
:' :15630-
4203.24
4207.39
'"4215.54
4221.69
4227.84
4233..9.9
4240.14
4170.93 1539.43
4197.07 .... 1541.17
1542.95
1544.71
1546.47
1548.23
1547.~?
2588.75 W
'25?6.44 W
2/.,04.12 W
2611.81 W
2619.4.9 W
2627.18 W
2634.86 W
1551 75 ~ 2642.._5 W
..,1._,5..:,. 51 S 2650.23 W
5510. 00
5520. O0
5530.00
5540.00
5540.00
5550.00
55/.,0.00
5570. O0
5580.00
4304.02 1441.06 S . 2540. ?6 W 157. :3:1
4-31().58 'i445.18 '.':-_; '- ...... 254~';~.§-'W ........... 1.~,/...57
4:::17 14 1449 ?9 c, ~5~ 62
.... ~ ._3 W 15~ o,:
4--~->o 70 1453.40 o 2559~. 95 W 1~.
4323:. 70 i 453.4G
433o..26 1457.=;1 S,,. ~___.~_,?S/-,A ?P W 154.0~
4336.82 1460.81 S ~' 2573.06 W 15~ 73
4:343.:38 '-' ':" ' '~ = ':~ o ..........................
14~4. 1
4:347, 94 1467.43 ._, ~'' 258A. 63_ W 153
5650.09 4252.44 1557.04 $ 2665.60 W
~_0. ~ ..... 4258.60 1558.80 S 2673· 29 N
....
5670.09 4264.75 1560.56 ~ 2/=.80.98 W
5680.09 4270. ?0 1562.32 ~ 2688.66 W
5690.09 4277.05 1564.08 S 26.96.35 W
5700.09 42~3.20 .... I~A=._ ,~ ~,. 84 ._~ 2704.03 W
5710.09 428.9.j52~' 1567. 60 S 2711 .72 W
5720.
· _, ] 1569.36 :~ 2719.40 W
57~o. 0~' 43o
-,-~ 5770.09 4326.26
:5780.09 4332.41
..i~ '5790.09 4338.56
: 5800.09 4344.71
5810,97 ...... 4a50.86
5820.09 4357.01
5830.09 4363.16
5840.09
· _':,.b¥O. U() 4:356.50 14/U. /4, .5 Z~V:~. ~1 ~
5600.00 4363.06 1474.09 $ 2/=,00.27 W lb.
561.0.00 .... _4.367.62 1477.40 S 2607.06 W -152.7,
5620.00 4:376 .1 ,_,':' 1480.71 ._.c; 2/=. 13 . :--:4 W 152 ~/=,,~.
56._~ ). O0 4382.74 1484 02 S 2620.62 W 152.54
5/..4~). 00 ....... 4~'~'°c.c~ :,. _30 14~: _7.. 3~_.S: ........... 2/_-.27 : 4 ........................... 1 W 152,~ 4~
5650.00 4395.86 14.90.64 S '2634.17 W. 152.49
56ACJ.00_. . 4402.33 1493. ~°. ._. $ · 2/_-.41.05 W 1~2._ .2z
.5670.00 4408.7.9 14.97.33 .S,. 2647.91 W 152.1C
2727. O~ -'~4 ........... 5680, ¢3~i ......... 2~2; i~'; ~5 ..... i~(i(Y;'67 $ 26~4-[~'--~--
5740.0.!; 430780 1572.88 g 2734.77 W .~,/-,'~o O0 442171 1504 ]~
· ......... t:z S .2661.63 W 1._~1.
5750.09 4313.?/.. 1574.64 S 2742.4/.. W 5700.00 4428.17 1507.37 S 2/._./._.8.4.9 W 151.8(
57601~' .... 4320. 11 ' 15~'6' 40 8 ...... '~7~0.--].~; -W -' ~571A. . 00 ..... 44134./.,3 1510.'71 S 2675.13.~ W ......... 1._1.74.=,- -'
1578.16 S 2757.613 W 5720.00 4441.09 1514.06 S 2682.21 W 151.7)
157.9..928 2765.52 W 5730. O0 4447.56 1517.40 S 268.9.07 W 151.6'.-'.
1581'.68'S ...... 2~7B; ~'70 ~ ............... 572~(i,'~:i~i ............ ~4':_e.2~; ()~ ........ i~0:'~ ".~-~- ..... ~.~;'~"i~ ................ i-~.~j:': 7(
1583.44 S 2780.89 W 5750.00 446C).48 1524. 10 S 2702.79 W '? '.7J
1585.20 $ 2788.57 W 5760.00 4466..97 1527.4:3 S 270.9./-.2 W lb I. 8J
1586,96 S ' 2796.~,6 W'' 5770.00 - ' 4473.2~7 153(5, 76- ~;.'-' '>7i6- 46-'W ................ i~i] 9~
1588.72 S 2803.94 W 57610.00 4479.96 1534.10 S 2723.29 W 152.05
5850.0~
5860.09 4381.62
4369.31 1590.48 S 2811.63 W 57.90.00 4486.46
4~'~"~6 .... 1E;.~2~ ~--~ .... -~~:~1' ~ ................... 5'8r}0.0(? ...... 44~2.95
5870.09 4387.77
5880.09 43.93..92
5890.09 44()0.07
5900.09 4406.22
591 o.,-o9 -- - 4412.37
5920.09 4418.52
1537.43 $' 2730.13 W 152.2~
i 549j. 76 ~ -: '2~'~;~'~, "~ ................... 152~-.-'411
10
43
76
10
43
79
1604.56 S 2873.1I W 587~00'Y~"-'"4~38.28 1564.15
2743.80 W 152·62
2750.63 W 152.8~
"-~7~7.'47 W ...............
2764.30 W 153.3]
-2771.14 W 153.6E
-'-2~,o~'-W ...............i~.8~
2784..91W 154.11i
5980.0~":~:~::'4455.43 1615.13 S 2.919.22 W
5990-~~144~1 . 58 1616.89 S 2~2/... 91 W
6000.~~.~7.~~ 7:3"- i6i8,6~ ~ .... 2~34,60 W
. ~01o.~.~73.88 1620.41S 2942.28 W
· 6020.~80.03 '1622.17 S 294.9..97 U
~: 6030.~~86.18 1623.~3 S' 2957.65 W
:'~ ~050.~-~-09J~!i; 4498.4~ 162745 S 2~73.02 -W
' ; ~'~ "~:: .................................... W'
:..,&O~O.O! 4504.64 162~.21 $ 2.980,71
i~?:~6070.09 4510.7.9 1630.~7 S 2~88~3~ W
:~i:~080.0~ 4516.~4 1632.73 s 2~6.08 W
4~2§:'0~ ..... 16341~"~ .... ~00~.76 w
4529.24 1636.2~ s 3011.45 w
4535.39 1638.01 $ 301~.14 W
454i.B4 ...... ig§~:~"§ ........ §~.~
4547.6.9 ,,1641.53 S 3034.51W
5930.09 4424.67 1606.33 S 2880.80 W 5880.00 4544.71
5940.09 -' --4430,82 ..... 1608.09'S .... 2888.48 W 5890.00 "'455t.i4'
5950.09 4436.98 1609.85 S 2896.17 W 5.900. O0 4557.57
5~60.09 4443.13 1611.61 S 2.903.85 W 5.910.00 4563..99
5970. O~ ~: :-~ 4449.28 --1613-7-~--:~- ..... ~-i'i'~ ~4 W ............ B~20, 60 ....... 4B76:'~-
1567.50 S 27.91.7.9 W 154.3.-.
1]570.86 ~'.-'.
1574.22
1577.58 S. 2812.45 W 1~_~,_.:?.~
1580.94 S 2819.33 W ./=.~
59130.00 4576.85 1584.29 S" 2826.22 W 156.05
594A 00 4583 28 1=~'~ $ .
- · .
5950.00 4589.70 1591.01 S. · 28:3.9.
59/..0.00 · 4596.13 1594.25 S 2846
5.970.00 4602.5/=, 1.597.49 S · ' 2853.87 W 157· 6/_-
· . ' '-. ~7. P,'-'~, i' ' i.i .................
5.980 00 4/-.08 9.9 i600.72 $ ~- ..... ,,.o, , 158.1(
59.90. O0 461=._,. 42 1603.96 S ' 2867.76 W 158. ._F.-
6000.00 4621.84 1607.20 $ 2874.70 W 15.9.0~
60i o,'O0. . '- ' 4~28'. 2~ .... i610.44 S '":-~-'~.q i--/~.~-{~ ........................ 159 :-'-54
6020. (~0. 4634.70 1613.67 $ ~.,_.~,.<,ooo 59 W 1AO_.. r~F..
6030.00 4641. 113 1616 91 S 28.95
. .53 W 160.5}
.................... t .--z ..................................................
6030.00 4641.13 1616..91 S .2895.53 W 161.1
6040 O0 4647 56 1620 15 S'
· · · ~,,. =. 47 W 161.6~
6060.00 4660.34 1626.65 S' 2916.41 W 162.1
6080.00 4673.07 1633.17 $' 2930.40 W 163.1
6150~ 09
6160.09
6170.0~
' 6180.09
:'6190.09
6~00.09
62~0.09
-6:2:20.09
.
4559.84 1643.29 $ 3042;19 W
4560.00 1645.05 $ 3049.88 W
4566.15 1646.81 $ 3057.56 W
4572.30 1648.57 S 3065.25 W'
4578.45 1650.33 S 3072.93 W
458g,60 ..... 1~52,0~__~______3080.&__2 W _..
4590.75 1653.85 $ 3088.30 W
4596.90 1655.61 $ 3095.99 W
4603.05 1657.38 $ 3103.68 W
6090.00 4679.43 1636,43 $ 2937.39 W
6100.00 4685.79 16:39.69 S 2944.39 W
6110.00 4692.15 1642.95 $ 2951.38 W
6120.00 4698.51 16.46.22 S 2958.5:7 W
6130.00 4704.87 1649.48 '$ · 2965.37 W
613~,00 ........ 4T04,~7 ..... 164~.4~__$__.__2~..~_.W
6140.00 4711.23 1652.74,8 2972.36 W
6150.00 4717.59 1656.£,0 S 2979.35 W
6160.00 4724.02 165~.11 8 2986.35 W
4609.20 1659.14 S
6240.09 4615.35 1660.90 $ 3119.05 W 6180. O0 4736.88
6250,._.~_0~ ......... .4_ 62!. · 51 __ ! 6.&2,_~.-6-_~ .... 3_1~_6._7. 3._W_ ............... 6190.00 .........._4-743, 30
6260.09 4627.66 1664.42 $ 3134.42 W 6200.00 474.9.7:3
~~270.0~) 4633.81 1666.18 $ 3142.1(, W 6210.00 4756.16
'~i~:/6280.09 4639.96 1667.94 $ 3149.79 W 6220.00 4762.5?
3111.36 W 6170.00 4730.45 1662.23 S 2993.35 W
1665.35 $ 3000.35 W
166.8.46 S 3007.35 W
1671.58 S 3014.35 W
1674.69 S 3021.35 W
1677.81 $ 3028.35 W
................. ! 6_4_;
16.5 .-'4(
1.65.98
166.6.(
......
167.~21
167.8"
168.55
16.c,''. 2~
1/_-.9.9J
170.6.~
... .....
171. :3:~
172.1';
172.8}
~:~:¢t/.::ii 6290.09 4646.11 166.9.70 SF~ 1 =o7.47 W 6230.00 4769.02
:?~iS!!?:6300.09 4652 26 1671 46 S 3165.16 W 6240.00 4775 44
_~'_;:~310.0~ ....... 4658.41 . !673.22 S ...... 3~72.84 W ........ 6250.00 ..... 4781.87
'"' '&320 O~ 4bb4.5& 1&74 ~8 S 3180.53 W &2bO. 00 4788 2:3
-"= ~330,0~ 4&70.71 l&7&,74 S 3188 22 W &270 00 4794 5~
: m m m
16.80.92 S' 3035.34 W 173.
1684.04 $' 3042. :34 W
16.87.16 $ . 3049.34 W 1
1690.42 .$ 3(,56.33 W
1693.6.8 $. 3063.33 W 176.7~
1696.94 S. 307(,.32 W 177.5
;~ 6350.09 4683.02
~ili 6360.09 4689.17
,~ 6370.09 4695.32
'' 6380.09 4701.47
!:.:'6~0.09 4707.62
__ iJ:!;~ 6400.09 .~Z} 3.7Z
~'6410.09 4719.92
·
-'_S.:..~.6420.09 4726.07
1680.26 S 3203.59 W 6290.0C, 4807.32 1700.20
1682.~ 321~7 W = 6300.00 4813.68 1703.46
1706,72
709.98
~ R30 0 8 ~ 713.24
1689.~1 1716.51
1690.82~~0 1719.77
1692.58 S 3257.38 W 6~6~'~J~'~)~'~2.14 1722.80
3077.31W 178.3J
3084.31W 179.11
3091.31W
· ..0~8.30 W 180.77
31(,5.29 W 181.6]
3112.29 W 182.47
- i i 28'
1694.34 S
~.~6~.07 W 6370.00 4858.80 1725.84
· . ~' .
1696 10 S 3272 76 W 6.~0.00 4865.46 1728 87
1697.86 S 3280.44 W 6390.0(, 4872.12 1731.9(,
1699.62 $ 3288.13 W 6400.00 4878.78 1734.93
83 1701.38 S 3295.81W 6410.00 4885.44 1737.97 S
~62.98 1703.14 S 3303.50 W 6420.00 4892.10 1741.00 $
3126.09 W 184.51
$ 3132.91 W 185.68
S' 313~.73 W 186.8]
$ 3146.54 W 188.0~
S.. 3153.37 W 1,~9.25
3160.19 W ~]'~
3167.00 W 191.6}
3173.82 W 192,8~
3187.45 W 195,3~
3194.37 W 196.4~
...... ~Oi-~--'~ ............... i~7~'5:~
3208.21W 198.6~
3215.13 W
13 1704.90 S 3311.18 W 6430.00 4898.76 1744.04 S
~75,28 1706~7--~ ..... ~~-~--W ..... 6440.0~ '-~905.'42 ..... 1747,07;:$.
~1.43 1708.4~ S 3326.55 W 6450.00 4912.08 1750.~11-:~"S
~87.58 1710.19 S 3334.24 W 6460.00 4918.67
~'~-- .... i'71i~-~5 ~ ..... ~4i.~2 W' ~ &4?o. OG ~'4~25.26 -"17~5~!98='ii?S-"~
.88 1713.71S 3349.61W 6480.00 4931.86 1758,92 S
04 1715.47 S 3357.30 W 6490.00 4938.45 1761.86 S
,~WACO'
D ~A E
F
ADJ. CHOKE
,,1
H:
J
o PS1
DIAPHRAGM
CHOKE LINE
'C
Q
P: R' CHECK
VALVE
-10-
TEST SEQUENCE ON VALVE,~
ii ii I ii
· 1 A-K-P-Q-E-M-T
· 2 B-G-F-D-8-R
#3. H-$WACO CHOKE-C-
ADJUST CHOKE-O
· 4 J-I
· 6 N
~/a.~..~ ' ~.~ ~::~
CHOKE MANIFOLD &
KILL LINE W/B.-O.P.
ON KING PLATFORM
CHECK LIST FOR NEW WELL PERMITS Company ~ Lease & Well No. 7~ 0% 5' /C ~ ~0 "'
ITEM APPROVE DATE
YES NO REMARKS
(1) Fee .~~~
(2) Loc . / ~'l~'~?
f2 thru 8)
(8)
(3) Admin~~'%''thru 11)
'(10 and 11)
( 4 ) Ca s ~ /-/i)"~[
(12 thru 20)
//,.r//
(21 thru 24)
(6) Add: jd~-/7L /~-/.'Z-ff
le
0
3.
4.
5.
6.
7.
8.
9~
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Is the permit fee attached ..........................................
Is well to be.located in a defined pool ............................
Is well located proper distance from property line ....
Is well located proper distance from other wells ....................
Is sufficient undedicated acreage available in this pool
Is well to be deviated and is well bore plat included ...............
Is operator the only affected party .................................
Can permit be approved before ten-day wait ..........................
Does operator have a bond in force .................................. ~
Is a conservation order needed ...................................... .~,.~
Is administrative approval needed .................................. ~/~' __. ]-~-7-~ d~~
Is conductor strSng provided ........................................ _ffff'//' /~/ ~A~gE,
Is enough cement used to circulate on conductor and surface ......... ffj-~ ?~C~
Will cement tie in surfade and intermediate or production strings ...
Will cement cover all known productive horizons .....................
Will surface casing protect fresh water zones ..................
Will all casing give adequate safety in collapse, tension and burst.
Is this well to be kicked off from an existing wellbore .......... '
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate well bore separation proposed ...........................
Is a diverter system required ....................................... //if~
Are necessary diagrams of diverter and BOP equipment attached ...... .~
Does BOPE have sufficient pressure rating - Test to ~.~zf2r~ p;ig ."
Does the choke manifold comply w/API RP-53 (Feb.78).'.'i ........
.
Additional requirements .............................................
Geology: En~i~e~ri..ng: _ m ·
rev: 12/08/83
6.CKLT
INITIAL GEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO. SHORE
de., w o r-r
Well Histo.ry File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIX.
,,
No special 'effort has been made to chronologically
organize this category of information.
.o
LIS TAPE
VERIFI CATIg.~ LISTING
LVP 010.H02 VERIFICATIO~ LISTIN'3 PAGE i
,-~ REEL HEADER- -,-~-
SERVICE NAME :GCT
DATE :85/05/16
ORIGIN :
REEL~N~ME :230331
CONTINUATION ~ :01
PREVIOUS REEL
COMMENTS :SCHLUMBERSER
~ELL SERVICES~ PROPRIETARY ~-IELD' TAPE
~ TAPE HEADER
SERVICE NAME :GCT
DATE :85Y05/16
ORIGIN :0000
TAPE NAME
CONTINUATION # :01
PREVIOUS TAPE :
COMMENTS :SCHLUM:BER~ER
WELL' SERVICES'PROPRIET'AR¥ FIELD TAPE
~ FILE HEADER
FILE NAME :GCT
SERVICE NAME
VERSION m :
DATE :.
MAXIMUM LENGTH
FIL:~ TY~E. :
PREVIOUS FILE
.001
1024
~-~- INFORMATION RECORDS
MNEM
CONTENTS UNIT TYPE
CN :
WN :
FN :
RAN$:
TOWN:
SECT:
COUN:
STAT:
CTRY:
ARCO ALASKA INC 000
TBU K-SRO 000
MCARTHUR RIVER 000
13W 000
9N 000
17 000
COOK INLET 000
ALASKA 000
COOK INLET 000
C~T~
~ ,m, m,,. ,,m
000
000
000
000
000
000
000
000
000
MNr-M CONTENTS ~NIT TYPE CATE
PRES: E
~°~-,- COMMENTS
SIZE
015
OOg
014
003
002
002
010
005
010
SIZE
CODE
065
065
065
065
065
065
065
065
065
CODE
000 000 001 065
LVP' OlO.H02 VERIFICA?IO~ LISTING PAGE 2
SCHLUMBERGER
ALASKA: COMPUTING CE~TER
COMPANY : ARCD-AL~SK~ INC.
WELL : TBU K-BRD
PIELD : MCARTH~R RIVER
C2UNT¥ : COOKiINLET
~L~SK~ = ALASKA
JOB N~MBER ~T. ~CC: 71~7~
RUN ~TWO, DAT: LOG3ED:
LOP: RiCK KRUWELL
C~SING : 9.625
CRSING : 7 ~ 13532 -
C~SING : 7 ~ 145~8 -
- 8IT SIZE :
BIT SIZE =
BIT SIZE :- 8.5
~.2-25' TO 11375
TO 145~8
TO 145~8
RECEIVED
MAY 2 ! 1986
LVP OIO.H02 VERIFICATIO~ LISTIN~
PAGE
GYRO CONTINUODS TOOL (GCT)
DEFINITI3NS:
HLAZ= AZIMUTH
DEVI= DEVZATI3N
GDEP= GYR3 DEPTH
V3EP= TRUE VERTICAL DEPTH
NSDR= NORTH 3R SO~TH DEPARTURE
E~DR= EAST OR WEST DE~ARTJR'E
D~L'= DOG LEG (CURVATURE DF THE WELL)
-~-,- ~ATA FORMAT. RECORD
ENTRY BLOCKS
TY~E
2
16
SIZE
!
R'EPR: CODE ENTRY
65 0
66 255
73 60
65 .tIN
66 t
DATUM SPECIFICATION BLDCKS
MNEM SERVICE SER'VICE
ID ORDER
9EPT
GDEP
VDEP
HLAZ
DEVI
NSDR
EWDR
DGL~
?,CT
C, CT
SCT
GCT
GCT
GCT
ONI'T: API API API API.FILE
LOG TYPE CLASS MOD NO.'
FT; O0 000
FF: 99 000
FT~ O0 000
DEG O0 000
BEG 99 620
FT- O0 000
PT O0 000
FT- O0 000
0.0
O0~
O0
O0
1!
00.
O0
O0
0 0
0 :: 0
0 0
0 0
0 0
0 0
O~ 0
0 0
SIZE SPL
1
1
1
!
1
1
t
REPR PROCESS
CODE (OCTAL)
68 O00000OO000000
SB.O0000000000000
58 O00000OO000000
58,00000000000000
58 00000000000000
5B 00000000000000
58 00000000000000
1. 58 00000000000000
LVP 019.H02 VERIFICATI2~ LtSTIN$
PAGE
DATA
DE~T-
9EVI
65536.5000
0.9122.
65600.0000
0.3411
65700.0000
0.0824
65800.0000
0,5493
65900.0000
2.5334~
66000.0000
7.0150
66100.0000
11.1599
66200.0000
19.3712
65300.0000
30.1936.
65400.0000
29.8784
66500.0000
33.3106
65600.0000
45.989t
66700.0000
50.5503
66800.0000
48.5575
66300.0000
50.0090
67000.0000
51.4505
67100.0000
51.3504
DEPT
3EVi,
DEPT.
DE'VI
DEPT~
DEVI
D~PT
DEVI
2EVI
DEV!
DEPT
DEVt
DEPT
OEVI
DEPT
DEVI
DEPT
DEVI
DEPT
DEVI
DEPT
OEVI
DEPT
DEVI
DEPT
DEVI
DEPT
DEVI
DEPT
DEVI
NSOR
GDEP
NSDR
GDEP
NSDR
GDE?
NSDR
GO;m
NSDR
GDEP
NSD~
GDE~
NSDR
GDEP
NSDR
GDEP
NSDR
GO~P
NSO~:
GDEP~
NS2~
NSD2
GDEP.:
NSDR:
GDEP
N.SDR
GOEP
NSDR
GDE?
NSDR
GDEP
NS~
36.0000
0.0000
53.2000
-0.2025
196.6499
-0.1796
3~1.5999
0.0288
486.6498 -1.2732
631-8997
-13.9516
719.0496
-31-2235
1088.0996
-~3.3983
1399.0994
-1~9.4979
1710,2991
-304.1143
2019.6489
-427.8997
2325.2690
-590.9473
2630.4990
-785.2107
2936.
-952.
3236.
-108~.
3537.
-1199.
3841.
-1315.
44871
7~61
1982
3093
1684
3298
3984
2B86
VOEP
EWDR
VOEP~
EWDR
VDEp.
EWDR
VOEP
EWDR
VDEP
E~-DR
VDEP
EWDR
VOEP
EWeR
VDEP
EWDR
VDEP
EWDR
VDEP
5WDR
VDEP
EWDR
VDEP:
EWDR
VDEP
EWDR
VDEP
EWDR
VDE~~.
EWDR
VDEP
EWDR
VDEP
EW2R
36.0000 HLAZ
0.0000 DGL
53.1390 HLAZ
0.0880 DGL.
196.6~87 HLAZ
0.2099 DGL:
341.5980 HLAz
0-3050 DGL
~86.6069 HLAZ
2.3182 DGL':
631~2262 HL~Z
-1.0t46 DGL
716.6292 HLAZ
-14.9177 DGL
I074.8~08 HLAZ
-65.3856 DGL
1356.9775 HLAZ
-152.4731 OGL~~
1624.4788 HLAZ
-262.6783 OGL
1893.6558 HLAZ
-350.5897 DGL:
2128.8633 H.LAZ
-455.9541 DGL:
2328.3535 HLAZ
-580.8827 DGL~
2530.5107 HLAZ
-736.6097 DGL:
2726.7500
-920.3532
2914.8154 HLAZ
-1125.2209 DGL
3105.9268 MLAZ
-1331,6072 DGL
158.9637
20.0362
154.5176
1.5676
10.3119
0.0273
64.9485
1.7272
181.5060
4.7564
200.9166
2.7612
224.1717
2.6805
219.8985
3.2119
223.5547
2.9008
223.9526
1.3168
212.7614
3.7756
212.9~87
4.2567
214.4477
2.3973
229.1304
240.4868
1.8975
240.492?
1.1192
240.9T$6
0.5231
LVP OlO.H02 VERIFIC4TI~
DEPT
DEVI
DEPT
DEVI
DEPT
DEVI
DEPT
OEVI
OEVI
DEPT
O~VI
OEPT
3EVI
DEPT
DEVi
OEVI
OEPT
OEVI
DEPT
OEVi
DEPT
OEVI
DEP~
OEVI
OEPT
DEVI.
DEPT
D~VI
OE~T
DEVI
DEPT
OEVI
DEPT
DEVI
67200.0000
49.7946
67300.0000
50.4998
67400.0000
49.0387
67500,0000
48.2592
67600.0000
47.5520
67700.0000
47.8385
67800.0000
55.8936
67900.0000
53.9211
68000.D000
52.1053
68100.0000
52.5123
68200.0000
51.8593
68300.0000
54.4965
68400.0000
56.1865
68500.0000
53.0934
68600.0000
54.9028
68700.0000
54.8073
68800.0000
53.3585
68900,0000
52.9270
GOEm
NSOR
GDEP
NSDR
GDEP
NSDR
$OEP
NS3R
GDEP
NSDR
GDEP'
NSDR.
GDEP
NSDR
GDE~;
NSDR
GOEP
NSDR
GDEP
NSOR
GDE?
NSD~.
GDEP
NSDR
GDEP
NSDR
GOEP
NSDR
GDEPi
NSDR
GD'EP;
NSDR
GDEP,
NSDR
GDEP
NSDR
LtSTiN?,
4142.5479
-1427.6296
4443.3486
-1538.6143
47~4.9473
-1646.6270
5050'~980
-1751'3982
5371.6973
-1856.4126
5695.8975
-1956.4407
6016.5~75
-2059.5034
6334.2969
-2163.6016
-2252.2959
6980.1475
-2355.9321
7306.6465
-2410.0308
7633.3 6
-25;84,8?35
79
-26
82
-28
85
-29
89
-29
92
-30
95
-31
55.0469
~7.3301
?~-6)53
02.9878
96.8457
02.8521
19.9961
95.7290
44.9961
79,8340
68.4453
58.t514
VOEP~
EWDR
VDEP
EWDR'
VDEP
EWDR
VDEP
EWDR
VDEP'
EWDR'
VDEP~
E~'DR
VDEP
EWDR
VDEP
~WD~
VD~P
EWDR
VDEP~
EWDR
VDEP
~W~R:
VDEP
EWDR
VDEP:
EWDR -
VOEP
E~R
VDEP
EWDR
VDEP
EWDR
VDEP
VDEP
EWDR
3299.0313
-1533.5273
3491.3276
-1736.4634
3685.2554
-19~0.6221
3885.2314
-2146.4932
4101-7520
-2359-2129
4323.1592
-2573.8354
4518'7803
-2805.796&
4700.3543
-3044.6968
4889.7546
-3286.0127
5o85.8037
3515.7503
5291.3506
-3752-2256
5.~88. 3682
-3986.18511
5667.1631
-4228.73~3
5852.9568
-4~67.6455
6042.2207
-4707.0840
6228.7695'
-4954.0420
6419.5195
-5203.3574
6611-789t
-5451-3809
HL~Z
DGL:
HL4Z
DGL
HLAZ
DGL
HLAZ
DGL
HLAZ
DGL
HLAZ
DGL:
HLAZ
DGL-
HL~Z
DGL=
HL~Z
DGL'
'HL.~Z
HLAZ
DGL~
HL~Z
DGL
HL~Z
DGL:
HLAZ
DGL~
HLAZ
DGL'
HLAZ
DGL~
HLAZ
DGLi
HL~Z
OGL~
PAGE
2~0.9215
0.3588
241.6261
0.5549
242.71?6
0.8071
243.3932
0'2793
244.3224
1.7215
246.0672
3.3972
2~6.0522
1.5116
2~7.3156
1-7204
24'8.6738
1.Z71Z
2~7.2191
4.5294
242.9035
0.2328
244.6808
2.5588
245.3742
1.2515
247.0078
0.7173
248.2639
0.5316
250.6153
0.8044
252.1409
0.6748
252.9900
1-2687
LVP' 010.H02 VERIFICAT!3~
OE PT
DEVI
DEPT
~EVI
9EPT
DEVI
DEVI
DEPT
DEVI
9EPT
DEVI
DEPT
OEVI
DE PT
DEVI
DEPT
DEVI
DEPT
9EVI
DE.PT
OEVI
DEPT
OEVI
DEPT
DEVI
DEPT
DEVI
DEPT
DEVI
DEPT
DEVI
69000.0000
51.4545
69100.0000
49.9558
69200.0000
56.0255
69300.0000
52.4055
69~00.0000
54.0883
69500-0000
50.8518
69500.0000
51.4919
69700.0000
48.5406
69800.0000
48.0959
$9900.0000
46.2B26
70000.0000
48.8384
70100.0000
46.4462
70200.0000
45.32-29
70300.0000
45.4242
70400.0000
43'5825
70446.0000
43.2017
GDEP
NSDR
GDEP
NSDR
GDEP
NSDR
GDEP
NSDR
GOEP
NSDR
GOEP
NSDR
GDEP
NSDR
SD:P
NSDR
GDE~
NSDR
GDEP
NSDR
GDEP
NSDR
GDE~
NSDR
GDE?
NSDR
GDEP
NSDR
GDEP
NSDR
GDE~
NSDR
~:~ FILE~ TRAILER
FILE N~ME :GCT .~01
SERVICE NAME :
VERSION #
DA T-5 :
LIST!N~;
9897.8945
-3230.7512
10227.9961
-3294.9150
10553.9453
-3351.4565
10887.3945
-3404.i084
11222.2441
-34~3.5571
11549.8945
-3454.0576
1.I878.095?
-3457.1250
12203.3945
-3439.8433
12524.9941
-3411.7822
12846.9941
-3375.5850
13161.4941
-3330.~854
134~4.6445
-3277.9526
13808.2949
-3218.1152
14127.?930
-3154.4063
144~7.3438
-30,39.98;54
145;)0.2930
-3079,3032
VDEP~
EWDR
VOEP
EWDR
VOEP
EWDR
VDEP
EW'DR
VDEP--
EWDR
VDEP
E~!DR
VOEP
EWDR
VDEm,
EWDR
VDEP
EWOR
VDE~
EWDR
YDEP
EWDR
VOEP
EWDR
VDEP
EW3R
VDEP
EWDR
VDEP
EWDR
VDEP
EWDR
6813.4355
-5701.5654
7022.8896
-59~8.4824
7221.9932
-6200.0176
74t4.1084
-6467.3037
7617.0137
-6730.6299
78!4.579~
-6990.7764
8015.8477
-7249.8877
8215.o957
-7498.2187
8463.7109
-7732.3545
8653'.8189
-7954.4658
8873.4;590
-8194.6094
9092.0977
-8~26. 5449
9317,2930
-8651.1367
9541.1230
-8870.0410
9768.0820
-9085.5.q, 69
9806.5371
-9120,3438
HL~,Z
DGL
HLAZ
DG L
DGL-
ML~Z
DGL~
HL.~Z
DGL~
HL z
DGL
HLAZ
DGL'
HL~Z
DGL,
HL~z
DGL::
HLAZ
DGL'
~L~Z
OGL '
HL~Z
DGL
HLAZ
DGL_
HLAZ
DGL
HLAZ
DGL
HL~,Z
DGL:,
PAGE
254.6979
0.4160
256.3259
1.7610
258.1753
1.7545
259.9238
2.5009
262.5751
0.6369
270.5828
1.8638
272.5757
1.3959
275.3826
0.2548
277.6367
0.3869
280.1125
1.6353
282.0281
1.0348
283.8436
0.9069
286.4065
0.;5701
286.20t8
0.5214
287.0440
0.1282
287.0552
4.4850
LVP OlO.H02 VERIFICATION LISTIN$ PAGE T
MAXIMUM LENGTH :
;ILE TYPE :
N'XT FILE NAME :
1024
'-~-,-,. TAPE TRAILeR
SERVICE NAME :GCT
DATE :85/05/16
3RIGIN
TAPE NAME :147~
CONTINUATION ~ :01
NEXT TAPE NAME :
COMMENTS :SCHLUMSERSER
WELL! SERVICES'PROPRIETARY FIELD TAPE
~'~' REEL'TRAIL:R ~'
SERVICE NA~E :GCT
DATE
ORIGIN :
REEL NAME :230331
CONTINUATION # :0!
NEXT-REEL NAME
COMMENTS :SCHLUMBERGER
WELL SERVI~CES PROPRIETARY FIELD
TAPE
UNIT Y.u, CATE SIZE CODE
OOO 000 015 O65
090 000 014 065
000 000 014 065
000 000 003 065
000 000 002 065
000 000 002 065
000 000 010 065
000 000 006 065
000 000 003 065
!INIT mYPE CATE SIZE CODE
000 000 001 065
* SC H_f, U M Bk:R
* A b~ $..w. A C~MPi. jTI NG
************************************************************************************
CO~P~.Nv = A~bf'.HT~C ~ICHrlMb~
~I~bn = ~CAPTMUP PiVED
,~_]R ~,~[l~b~R A~ t-CC: 70]62
C~i*.'G = 9,6~b" R !!.347' - RI~ ,SIZE = 8,5" 'tO la373'
OE~,{¢ITY = 9.(; h~/C RM = 0.925 ¢ 75
VI~COSI'I:Y = -%6.n S RMF = 0.747 ~ 60
PH = l O. (') R~,iC = t, 320 g 60
~[,UIn f,OgS = 4,! C~ R~4 ~T BHT = 0 416 P !.75
~**** mlt~S {)~'!'A HAS ¢~E~i,~ D~_:B~H SH1FTBD - OnEs NOT OVERLAYS ~iELD P~INTS
**********************-**********************************************************
SPH~R1'CAbL~ E'OC!~S~D bOG (DIL) 14349' '~U !~.34'
14320' ~0 1~347' *
144q7' mO 1~800'
SIZE REPR CODE EgTRY
1 66 0
1 66 1
,% b5 ,lin
.r) g PT
SFT, Li
TLP, r~I!,
9T
CALl LOT
~QTA ~'~G~
0
~'T O0 000 O0 0
o~-{~a~ no ~20 al 0 0
oB~'~ O0 12o 44 0 0
~ oO OlO Ol 0 0
cAPI O0 3!o O1 0 0
(laPt O0 )10 nl 0 0
~5!F O0 ~20 gO 0 0
'.~V O0 010 0! 0
T h ~ 0 ? 80 0 ! 0 0
C/~3 ~0 350 02 0 0
o(', 420 al 0 0
0o 00o n0 0
PO nO ~90 O0 0 0
CPS ~O 330 3l 0 0
CP~ o0 13o 30 0 0
0o 359 O1 o 0
CAOZ nv t10 O1 0 0
Caoi O0 _I!.0 o1 0 o
OU no 719 50 0 0
PO nO 71° 50 0 0
;" P ~,~ O0 790 50 0
p p ~, o 0 79 ~ ~ 0 0 0
~IZg SPb RgP~
CODR
4 ! 68
4 i 68
4 1 68
4 I 68
4 1 68
4 I 68
4 1 68
4 1 68
4 I 68
4 1 68
~ 1 68
4 1 68
4 1 68
4 I
4 1 68
~ I 68
4 1 68
4 I 68
4 I 68
4 1 68
4 1 68
4 I 68
4 I 68
4 ! 68
000000
O00000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
000000
PROCKS$
(OCTAL)
0000000o
00000o00
OOOO000o
0000000o
O0000000
UO000000
00000000
00000000
00000000
00000000
00000000
00000000
O000OO00
00000000
00000000
O000000O
00000000
00000000
00000000
00000000
00000000
00000000
00000000
00000000
00000000
~P
SP
47~i~406 GR
-099 ~5nO CALI
-99q.~500 RN~A
-990.2500 PEW
-099.~500 OOTA
52.0742 TLO
~72.6406 GR
-09q.2500 CALl
-o99.2500 PNRA
-q90.9500 oEP
-990.~500 POmA
26.84~6 TLD
60.2930 ~R
6~.a367 rn[..l
1.7247 PF~PA
13,36~3 IbM
472 6i06 OT
-q991~590 RHOB
.99,2500
-999.~500 THOR
13.3535
472,6406 OT
-099,~500 PHO~
-990,7500 up~I
-99q.~500
-090.~500 THOR
22,0049
60.7930
14,1660 ~HOB
1.8360 ~PHI
33 8242
61 0117
-999 2500
-999 25O0
-999 ~500
-999 2500
33,B242
6i,01!7
-999.~5o0
-999.2500
99~500
15,1582
b1.1902
?.]401
10,6934
S P
~P
OR.FlU
~,f C' N b
OEPT
mP
~P
OE:PT
~P
~P
OR!~O
SP
~C,~, L
]58
6
i
-3
3
509
2
~4o0
~;25
1300
-.5
-5
-2
-2
9. ~-00(; FCNb
6.064R
7.76q~
0,0605
o 2500
n oO00 SF[:~J
?.~258 SGP
0.02?5
1.7500
~.!367
0.a272
0.q000 ~FLIJ
~.S000 vCT,iL
o.4!P0 P~?A
105~.6875
9.~973 POTA
42.8242 tho
~o.01!7 CR
55.3242 CALl
3~67.5000 PEF
1,7Og0 P0TA
59.7930 IL0
45.7617 GR
44.~242 CALl
t,]~n7 ~NRA
301!.5000 DE~
45.mB67 ~R
45.6055 CALl
t.91~2 RNR~
2065,5000 PE~
!.~207 POTA
57.6992 CALl
!.5372 RNPA
8.9066 ThO
62.26!7
5P.1992 CALI
2.3362 mN~A
1401.6875
~.55~5 POTA
29.3643 !ho
!07.0273 CAT,I
3,2092 RNRA
59~.~125 Pg~
~.~902 POTA
26.~455 ?Ln
4~,79~0 ~R
3.2(353
46,9402
49.0!t7
!.51~6
2.4905
0.0171
6!,7305
45,7617
g.5020
1,5333
2,4299
0,0112
13,6115
45.8867
14.4150
?.o569
0,0122
4g.01t7
56,7305
8,8770
1,6143
2,5647
0,014u
10.7129
67.26!.7
9.8379
2.5217
2,8147
0.0156
30,1924
!09,9023
6.o750
1,3518
3,7834
0,0249
20.2216
49,29~0
S GR
THOR
IbM
DT
RHOB
WPHI
SGR
THOR
DT
~HO8
THOR
~PHI
THOR
DT
~P~I
THOR
IBM
..q t..{. OB
~'PHI
SGR
THOR
DT
SGR
THOR
DT
63.6367
~.2363
27 7236
63 3242
2 5061
9 9609
55 3242
3 9709
31,1924
63,6367
2,5276
9,7656
44 3242
1:4756
12,2051
68,0273
2.4377
13.4277
~5,6055
4,4890
30 2705
6 16367
2 5401
11 4746
57 6992
8 1113
7 7156
76 0273
2 4807
22 2656
58 1992
5 7703
19 0205
74 5898
2 0205
40 8203
107 0273
13 7520
1-~ g330
PAGE 6
CGP
gP
q p
n~;PT
gP
~P
wCN l..,
Sp
C G '*
-75. ?2?7 SGR
0.011 7 ?~ .R A-P
5R67. ?bOO ~'CNU
5q. -t242 ¢P, TA
t 3700. hO.nO -3~.g508
0.0752
3985.q0o0
0,4316
13nOO.dOOO gFI'..U
-17" 4375
- ! 7 ~. ,~ 3 7 5
4283. 9500
1.. ! 905
44. ~055 CALl
~ .5538 ~NRA
3373,~000 PEW
1.70aO _t'OTA
13.3379 IhD
57.79~0 GR
55.0180 CALl
1.0542 ~NRA
2~4~,~0~0
1,5137 PUT~
97,0273 ~R
85.?773 CALl
~.6b06 PNRA
1316,6875 PEW
~.~555 POTA
17.97]~ ThD
4g.7930 CALI
234~'50n0
1,0254 POTA
q,68~6
'17.~398
6~,~148 CALl
?.65a4 ~NRA
1076.6875
~,1973 POTA
1.00,0898
~0B,2773
].tLnb
79~,~125 PE?
2.3438 YOgA
q.~770 IUD
45.1055 CALl'
2.!077 PNRA
1,4160 POTA
a.3926
t,6707
~.5510
0,0171
14,3457
52,7930
8,6035
1,9922
2,3674
0,0151
13,2285
97,0273
12,1035
?,8499
3.7815
0.0106
5.7585
2,0452
2 4749
0:0103
fl.494!
72.9398
t0,0238
3,0510
2.~792
0,0220
16.q500
109,0808
1!,6035
],0627
0,0234
6,6960
50,3555
~.]770
2.5784
0,n142
THOR
DT
~ttOB
THOR
DT
RHOB
THOR
DT
SGR
RHOB
NPHI
THOR
ILg
DT
~HOB
~PgI
SG~
THOR
PT
NPHI
THOR
2.4006
12.3047
44,1055
8,47~5
Il 1895
70 7773
2 3811
18 0664
55 9180
2 t104
!4 7051
72 2t48
2 6272
25 3906
85 27?3
It 5645
6 4265
79 2773
2 3733
!.8 0664
46 2930
3 20!4
7 6726
72 2148
2 4905
25 9766
69 2148
7 3484
16,84~6
84 9648
2 4358
3] 1055
108 2'173
8 9316
6,0265
B4,6523
2,3147
20 ~543
45:i055
3,2053
SP
SP
~F
~CNL
~P
~P
~C~L
CUR
12000.0000 aFI,t{
-!37.E675 5GR
O.- 0205 ~RAT
!.o264
!2~0o.09n0 SFI.U
0,0830 NRAT
2o55.5000 ~C~L
6!.9492 POTA
3.3538
24on.0uoo SFT.U
-91.5977
-91.5977
O,nO00 .'-..!_RaT
3~65. 5000
36.4190 P[_TA
!
12lO0.OOOo
9695 ~R
-5~[~695
2~45.5000
40.3930 GR
0,076b POmA
R.4004 ThO
54.~7a2
56.~902 CALl
1.9776 ~NRA
2065.5000
2.!484 POTA
7.6765
60.6055 GR
69.2148 CALl
~.2522
16~1.6875 PEW
2.3438 POT~
P.oO~O !bO
102.5273 GR
90.7148 CALl
q94,31~5 PE?
6.n'157
93.4648 OR
~O.7773 CALI
?.fi362
06o.81~b PEF
!.70o0 POmA
~,4221 RNRA
i317.6875 PEF'
!.,~b25 POT~
~.9601 Thn
90.7773 GR
!06.4648 CALl
2.7901 ~N~A
214414 PUT~
10.2~61
40,2930
19.~080
4.7078
2.6506
0.0098
5.0906
54.5742
9.1270
~.!155
2.4553
0.0215
5.!.765
60.6055
9.1816
2,3596
2.4397
0,n234
12.3145
!02.5273
10'2910
~.8401
2,9866
0.o21o
6.5476
93.4648
11.7520
3.0745
3.1526
0.0171
3.9358
49.4i80
8,64~6
~,d768
2.7092
0,0156
0.8223
99.7773
17.9736
3,2229
o,0244
DT
~HOB
NPHI
SGR
THOR
DT
NpH]
THOR
DT
NPHI
T~OR
DT
RHmB
~PHI
THOR
PHOB
NPHI
SGR
THOR
~PHi
~4PHI
$(;~
13 1348
140 1875
I 5118
56 0547
3~ 0492
4 6609
4,8445
82,7773
2.41~2
17.7734
56,1992
0,3379
4,9968
80,3398
2,4163
21,8262
b8,2148
5,6648
10.6348
74 2773
2 4670
3O 4199
90 7148
7 9421
6,6140
3,4648
8~,3147
28,]20~
89,7773
7,08~2
4,3093
86,90~3
2,31n8
25,0488
48,8867
2,3049
8,6426
77,9023
2,50o2
25,2930
106.4648
I1,5723
bEPT
~p
~EPT
! 1600. i~-O~-0 ..qF l,d
O. c) b: 2 9 ~J iq: 1~-T
~.9551 IbP
74.5273 GR
73,339B mALl
~.3967 PNRA
!4'!9.6875 PE~
t.5137 POTA
9~.7773 CAt. I
~59.3125 per
~.0277 POTA
7.5632
5!.0742
47.5430 ?AI, I
!724,6875
2.0508 POTA
10.56~5 TUn
100.1523
!!~.08~8 CArpi
2.9807 ~N~A
87~ ~125
a.4238 lbm
5R.5742 GR
56.~367 CAbl
2.3049 ~NRA
161.~.6875 DEF'
!.8555 PD~A
6.¢902 TLn
59.~1~0 GR
55.n430 CA!,I
162~.~875
!.95~5 POTA
i6.7393
74,527&
fl.8301
2.6057
t,2424
0,0151
5.301.5
94.5898
12.6582
3,53~4
2.9670
0.00~3
7.6921
51.0742
8.77K4
2.3967
2.3596
0,0205
10.9785
109,t523
20.7705
3.1643
3,2991
0.0210
6,44~1
58,5749
~,5566
2,4202
2,4592
6.1804
59.4180
O.1504
2.465~
2.4612
0,0186
0,8691
!00,9648
15,1066
2.7639
TLM
THOR
I6,4
PT
THOR
DT
RHOB
~!PHi
THOR
UT
~HOB
NPHI
THOR
DT
~HOb
NPHI
-~T
.~HOB
;,:PHI
TttOR
DT
14.0957
72,40~3
2,4749
24,4141
73.3308
6,66B7
4,692l
U4 7148
2 4495
35 4980
96 2773
6 8875
6.9968
B5,65~$
2 34q9
221~553
47,5430
3,7502
9,3379
7~.4023
2 5237
2~:9531
119,0898
0,1.49b
6.2507
87,4023
2,3342
23.3887
56,1367
4.0984
5 $687
87,8398
2,3323
2~,7539
55 043~
8.580!
77.8398
~,48~-7
25,4883
934.41~5
1.o043
0.!660 TLD
95.4023 CR
9~.]308 CALl
~.43!9 CNRA
1~0!.6875 PEF
!.8066 DDTA
ln. BO~! ![,h
!0].7148 GR
107.4073 CA!,I
933.31~5 ~E~
-P9g.?500 TbD
47.2930 CAb!
279.~906
1.7207 PUTA
EOF
9ATE
ORTGT~ :~S!A
TAPE ~ :
~O~T!Nt~ATInR # :0i
gE~VTCV NAH~ :El)IT
DATE
3.65~4 S(;~
0.0100 THOR
!O.6660
95.4023
!6.0049
2.4983 NPHI
3.~741
0.0181 THOR
17.0957
!03,7148 DT
16,5205 RHO8
].0061 ~PHI
].0198 SGR
0,0205 THOR
-999.2500 DT
~.7520 ~HOB
4,9226 ,~PHI
21 8955 SGR
97.2773
7.7039
!816
~.5]~4
20.5566
98,~395
~.8770
9.1504
72,40~3
~.5510
26,6602
-099.2500
-O99 2500
,14~B
u4,5020
47.2930
7.0476