Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
184-047
Imal ect Well History File (: ge XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. i ~'_~ - ~/~"7_ Well History File Identifier RESCAN DIGITAL DATA OVERSIZED (Scannable) ~ Color items: [] Diskettes, No. [] Ma ps: [] Grayscale items: [] Other, No/Type [] Other items scannable by large scanner ,,~..~r. Poor Quality Originals:~t("~lb OVERSIZED (Non-Scannable) [] Other: NOTES: '~ Logs of various kinds [] Other BY: BREN VINCENT SHERYL MARIA LOWELL DATE: /S/ Project Proofing .. BY: BEVERLY BRE~SHERYL MARIA LOWELl. Sca~ningPreparation ~ x30= (~/) BY: BEVERLY BREN,~ SHERYL MAR A LOWELL DATE:7~/~' Isl + .. DATE/v/~ TOTAL PAGES /s/_~ Production Scanning Stage I PAGE COUNT FROM SCANNED FILE: Stage 2 BY~ (SCANNING IS COMPLETE AT THIS POII~IT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDiVIOUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES) PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: % YES __ NO DATE://tL¢iO~ F NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES NO ReScanned (individual page [special attention] scanning completed) RESCANNEDBY; BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: IS~ General Notes or Comments about this file: Quality Checked (done) 10/25/O2Rev3NOTScan ned.wpd AL ,(AOILAND GAS CONSERVATION COMM~,..,~ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend m Operation shutdown __ Re-enter suspended well __ A~er casing __ Repair well ~ Plugging ~ Time extension ~,* Stimulate Change approved program ~ Pull tubing ~ Vadance ~ Perforate __ Other 2. Name of Operator ARCO Alaska, inc. 3. Address P. O. Box 100360, Anchorage, AK 4. Location of well at surface See Attached Sheets At top of productive interval See Attached Sheets At effective depth See Attached Sheets At total depth See Attached Sheets 99510-0360 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) See Attached She~1;~ 7. Unitor Property name Kuparuk River Unit 8. Well number WqPl-l~ 20 9. Permitnum~er See Attached ~heet 10. APInumber 50-- See Attached Sheet 11. Field/Pool West Sak 0il Pool feet 12. Present well condition summary Total depth: measured true vertical See Attached Sheets feet feet Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: feet feet Length Size See Attached Sheets measured None true vertical None Tubing (size, grade, and measured depth) See Attached Sheets Packers and SSSV (~pe and measured depth) See Attacherf 13. Attachments Description summary of proposal .~ Plugs (measured) Junk (measured) Cemented Measured depth True vertical depth RECEIVED FE ; "' ~Jas .ka. 0il & Gas Cons. Commission Detailed operations program ~ BOP sketch 14. Estimated date for commencing operation 15. Status of well classification as: 16. if proposal was verbally approved Oil ~ Gas ~ Suspended __~ N ame/of~t~orover . Date approved Service 17. I hereby cefdfy that the f,/~ oi.r~true an.d correct to the best.of my knowl ..e~l_ge. . "~- / ¢;:~" .~ "-- ~ - FOR COMMISSION USE ONLY / ~ Conditions of approval: Notify Commission so representative may witness / ' Plug integri~ ~ BOP Test ~ Location clearance __ Mechanical Integrity Test ~ Subsequent form required 10- Approved by order of the Commissioner Form 10-403 Rev 06/15i88 050/5A4 IApprova' No- ¢ .-- ~:~,._~ Approved Copy Returned Commissioner Date ~~~_/~:~ __ S U B/M IT,4/N TRI~ LI CATE West Sak Pilot Pad APPLICATION FOR SUNDRY APPROVALS ARCO Alaska, Inc., requests an extension of one (1) year for,t~e'~l~l~n al abandonment inspection of the West Sak Pilot pad location.,~r~ral photos show that the location is clean and the reserve pit i,n~9~d condition. This pad is under consideration for use in the West S&~ full field development plan. The reserve pits are scheduled to be closed in 1989 pending approval by ADEC of a close out procedure. 050/SA4 1/20/89 W~ll # WSP - ls WSP - 2 WSP - 3 WSP - 4 WSP - 5 WSP - 61 WSP - 7 WSP - 81 WSP - 9 WSP - 10 WSP - 111 WSP - 12 WSP - 13 WSP - 141 WSP - 151 WSP - 2O APPLICATION FOR SUNDRY APPROVALS Kuparuk River Unit Permit Cf 83 - 175 83 - 168 84 - 15 83- 152 84 - 46 84 - 56 84 - 52 83-117 84 - 47 83 - 171 84 - 81 84 - 39 83 - 185 84 - 76 84 - 63 85 - 166 APl # 50-029-21050 5O-O29-21O44 50-029-21072 50-029-21028 50-029-21099' 50-029-211 04 50-029-211 O2 50-029-20994 50-029-21100 5O-O29-21O47 5O-O29-2112O 50-029-21093 50-029-21060 50-029-21116 50-029-21110 50-029-21401 Aooroval Cf _ 650 647 646 649 652 653 654 655 656 657 658 659 660 661 648 FE3 -2. 1t~ ~,iaska Oil & Gas Cons. A[~chorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LO 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [~ SERVICE [] ._ 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-47 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21100 4. Location of well at surface 9. Unit or Lease Name 1669' FSL, 2273' FEL, 5ec.35, T11N, R10E, UN Kuparuk River Unit At Top Producing Intervai 10. Well Number 1654' FSL, 1847' FEL, Sec.35, TllN, R10E, UM WSP-9 At Total Depth 11. Field and Pool 1644' FSL, 1745' FEL, Sec.35, T11N, R10E, UM Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Seriai NO. West Sak 0i 1 Pool Objective RKB 122'I ADL 25661, ALK 471 12. Date Spudded 13. Date T,D. Reached 14. Date Comp., SuSp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions 03/26/84 03/31/84 01/24/87'. J' N/A feet MSLI 1 i 7. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 4225'MD 4162'TVD $~£aoe - YES [~ NO []I N/A feet MD 1500' (Approx) . . 22. TYpe Electric or Other Logs Run DIL/FDC/CNL/GR, GR/CCL, NFD, Gravel Pack, Photon log. 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED - . - 16" 62.5# H-40 Surf 120' 24" 200 sx CS II 9-5/8" 36.0# J-55 Surf :~380' 12-1/4" 1350 sx CS Ill & 250 sx Class G 7" 23.0# S-95 Surf 4212' 8-1/2" 190 sx Class G _ , _ 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) ~ ~ -.~ '~-'~:, 2-7/8" 3859' 3401 ' .. ',.-: 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. .... ,.-'~ '-".~;~!)~ DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ..... , ~ ..... See Well History attached to the Well ComDletion $%~..% v ........ dated 02/06/0.5. ;. ~zs~':~ ....... P1 ua .(~ ?,014 ' 7S .~x £1 ~_~_~ c · r 2-7/8" x 7" anti R~; ~× I~.R I (~nn.~ · -rr ..... · 27. N/A PRODUCTIO,N TEST2-7/8" tbg & 2-7/8" x 7" ann 35. ~,.~$ Date First Production I Method of Operation (Flowing. gas lift, etc,) Date Of Test Hours Tested PRODUCTION FOR Oi'L~BBL GAS-MCF WATER-BB'L CHOKE SIZE GAS-OIL RATIO . TEST PERIOD ~ . . , Flow Tubing Casing Pressure CALCULATED.1~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None · Note: Drilled RR 04/01/84. Frac string run 04/16/84. Frac well & ran tbg 08/25/84. ,,,--, , ........ .~ . ~ - Form 10~,07well was recompleted 07/26/85. Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SlD~r,?.~, .r~Ni ': ,.-: :. 7. .... ~i~;.-. '.: :'"; _'? ,' :", ", ' i"-~ ~'.' FORMATION~I'ESTS. ' GEoLoG.ICMA ... ~ .: ........... -.,':,-~ ....... --, ........ : . .... ..., ! .. .. .. .:: '-"..!'..';' ....:~,....'-.- .-. .,,~; >....; ~.~;.;,,.:,:+ .... .~ .~ .. :..,.. . .~ ...... ., . , . -,. -.;.. ;.- :.,.? -.: -..~'-.-:.-,.,' - .: ,: ~ -~, ~. :: . . .. , , NAME I nclu de interval tested, pressure data, all fluids recovered and gravity, ' MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. .. Top West Sak 3550' 3495' N/A Base West Sak 3930' 3870' · ,. · ; . · .. · . · ~ . 31. LIST OF ATTACHMENTS None 32, I hereby certify that the foregoing is true and correct to the best of my knowledge : ' Signed /~~J~ ~~.~ Title Associate En~ineer Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used' as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump; Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 STATE OF ALASKA ALA,--_ .A OIL AND GAS CONSERVATION COM, ,,SSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~ Alter Casing ~ Other Stimulate [] Plugging .I~ Perforate ~ Pull tubing ABANDON 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. RKB 122' 3. Address 6. Unit or Property name P.O. Box 100360 Anchorage, AK 99510-0360 Kuparuk River Unit z. ¢¢umber 4. Location of well at surface 1669' FSL, 2273' FEL, Sec.35, T11N, RIOE, UM At top of productive interval 1654' FSL, 1847' FEL, Sec.35, TllN, RIOE, UM At effective depth 1650' FSL, 1797' FEL, Sec.35, TllN, RIOE, UM At total depth 1644' FSI', 1745' FEL, Sec.35, T11N, RIOE, UM 8. Approval number 655 9. APl number 50-- 029-21100 10. Pool West Sak Oil Pool 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Conductor Surface Length 80' 3346' 4180' Production 4225'MD 4162'TVD Surface Surface Size 16" 9-5/8" 7" feet feet feet feet Plugs (measured) Junk (measured) Cemented 200 sx CS II 1350 sx-CS II I & 250 sx Class G 190 sx Class G None 3878'-CCL tool Measured depth 120'MD 3380'MD 4212'MD True Vertical depth 120 'T VD 3327 'TVD 4149 'TVD Perforatiop depth: measUred true vertical None None Tubing (size, grade and measured depth) 2-7/8", J-55 tbg w/tail @ 3401' Packers and SSSV (type and measured depth) RR-2 pkr ~ 3401', 1-B pkr ~ 3878' 12. Stimulation or cement squeeze summary 13. Cons, Intervals treated (measured) Plug 3014,, x 7-ann, 2-7/8" x 7" ann(S mC¢ Treatment description including volumes used and final pressure 75 sx Class G~ 83 sx CS I (approx.)~ 2,5 sx CS I Representative Daily Average Production or Injection Data N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 14. Attachments (Addendum dated 02/17/87) Daily Report of Well Operations ~ Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Form 10-404 Rev. 12-1-85 Title Associ ate Engineer Date -11- 7 (DANI) SW02/023 Submit in Duplicate / Feet ADDENDUM WELL: 1/o4/8~ 1/05/8~ 1/17/87 1/20/87 1/24/87 WSP 9 Set production zone cement plug as follows: RU DA, perf 3824'-3826' RU BJ, displ tbg & ann to 9.8 ppg NaC1 thru open choke ~/400-500 psi back pressure. SI ann. M&P 75 sx Cl "G" w/1.0% A-2 & .2% FP-6L. Displ w/7.5 bbls NaC1. Shut dn open ann & displ'd to within 2 bbls of balanced plug. Max press = ±1000 psi, 1 - 4 BPM. Tagged production zone plug in tbg @ 3014' Production zone plug accepted by AOGCC. Perf well @ 150' in tbg f/surf plug. Set surf plug as follows: RU BJ, M&P ±83 sx CS I. Circ cmt dn tbg thru perf @ 150' & up ann.(Z'~lS"K Noted flow out 9-5/8" X 7" ann, instl guage. Press built to 170 psi. Att to pmp in 9-5/8" x 7" ann. Press'd up f/~l BPM to 2000 psi. RD BJ. Bled press to 0 psi. SI well. Removed wellheads, RU BJ and mix and pmp 35 sx CS I to fill tbg and ann vOids. Weld on top caps and backfill. ' Drilling Supervisor Date MEMORANDUM THRU: FROM: Stat¢ ',of Alaska ALASKA O~L AND GAS cONSERVATION CO~4ISS]'ON Lonnie C. Smit Commissioner Bobby D. Foster !'/~ ~, Petroleum Inspector FILE NO.: TELEPHONE NO.: SUBJECT: January 30, 1987 Wellbore Plugs & Markers ARCO KRU WSP Wells 1, 9& 15 Kuparuk River Field Wedpe.sday~ January 21, 1987, I talked with Ray Springer, ARCO representative, concerning'the surface plugs on wells 9 & 15. I noticed while checking the P&A marker plates that no cement was showing in the 2 7/8" x 7" annulus on these wells. He said he was gping to finish cutting off the tree on well ~1, and make sure that the cement was in place on that well before ordering cement for the other two wells. Friday, January__.23, 1987.' Mr..Springer contacted me on Thursday and informed me that the cement was in place on well ~1, and he would re-cement the annuli on wells 9 & 15. I arrived on the location at 1:30 p.m. this date and BJ Cementing had jus~ finished cementing the annuli on wells ~ & 15. ' ' I inspected the annuli on both wells, and the cement was in place and not falling. Ray gave me pictures of the marker plates on all the wells except 9, 15 and well ~1. He will get the pictures of these wells to me as soon as the work is complete. In summary I observed the top cement plugs in wells 1, 9 & 15. Attachment On 1/26/87 Ray sent me the pictures of the P&A marker plates on wells 9 & 15, and One of the marker post on. well ~1. These pictures are attached to this report. . The information on the marker pos% ~ well ~1 w~s checked an~ found ~o be cc~rect by ~d Sipple. The pi~s of the marker pla~es on wells 5, 6, 7 & 12 are ~Dt good, but all th~_~p~~ w~re checked by ~ before they w~re w~lded in plaoe. ? STATE OF ALASKA '~'-~ ALASKA .,L AND GAS CONSERVATION COMMIL .ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: AbandonX~¢.. Suspend ~ Operation Shutdown ~ Re-enter suspended well F' Alter casing ~ Time extension ~ Change approved program C Plugging~ ~ Stimulate :q Pull tubing- Amend order- Perforate- Other~ 2. Name of Operator ARCO Alaska, Inc. 5. Datum elevation (DF or KB) 1 22 ' RKB 3. Address P. O. Box 100360 Anchoraqe, AK 9951 0-0360 4. Location of well at surface 1669' FSL, 2273' FEL, Sec. 2;5, TllN, R10E, UN At top of productive interval 8. 6. Unit or Property name Kuparuk River Unit 7. Well number WSP-9 Permit number feet 1654' FSL, 1847' FEL, Sec. 35, At effective depth 1650' FSL, 1797' FEL, Sec. 35, At total depth 1644' FSL, 1745' FEL, Sec. 35, TllN, RIOE, UM T11N, RIOE, UM T11N, RIOE, UM 84 -47 9. APl number 50-- 029-21100 10. Pool W'est Sak Oil Pool 11. Present well condition summary Total depth: measured true vertical Effective depth: 4225 'MD feet 41 62 ' TVD feet Casing Conductor Surface measured 3878 ' M D feet true vertical feet 3819'TVD Length Size 80 ' 1 6" 3346 ' 9-5/8" Product i on 41 80 ' 7" Plugs (measured) None Junk (measured) 3878' - CCL tool Cemented Measured depth True Vertical depth 200 sx CS II 120'MD 120'TVD 1350 sx CS III & 3380'HD 3327'TVD 250 sx Class G 190 sx Class G 4212'MD 4149'TVD Perforation depth: measured 3552'-3592'MD, 3622'-3662'MD, 3664'-3674'MD, 3684'-3694'MD 3700'-3720'MD, 3756'-3766'MD, 3776'-3826'MD, 3844'-3864'MD true vertical 3497'-3536'TVD, 3566'-3606'TVD, 3608'-3617'TVD, 3627 '-3637 'TVE 3643 '-3663 'TVD, ~698'-3708'TVD, 3718'-3768'TVD,'-.~.785'~-3805'TVE~.~.~,.~.~.~. ~" t' ~. Tubing (size, grade and measured depth) 2-7/8", 6.5~, J-55 ~ 3401 ' BOT RR-2 packer ~ 3401' [[.[;~'~; 1._ ;?~ 'i~h~'~'~,O,,; Packers and SSSV (type and measured depth) BOTI-b packer ~ 3878' 12.Attachments Description summary of proposal~ Detailed operations program 13. Estimated date for commencing operation January 1, 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ~ ~bL~,A..., Title As socia te Engineer Commission Use Only (KKL) 148 Date IZ-17'DL,, Conditions of approval Approved by Notify commission so representative may witness Plug integrity - BOP Test ~- Location clearance .. Commissioner by order of the commission Date/,,~ ':orm 10-403 Rev 12-1-85 Submit in triplicate W,SP-9 PLUO AND ABANDON SUMMARY OF PROPO.~L ARCO ALASKA, INC. PROPOSES TO PLUG AND ABANDON THE WELL AS FOLLOWS: 1.DISPLACE THE WELL TO BRINE THROUGH THE JET PUMP CAVITY. BRINE DENSITY WILL BE APPROXIMATELY 9.8 PPO. 2. PERFORATE THE GRAVEL PACK $CREENSAS DEEP AS POSSIBLE, ,3. RIO tJP CEMENTING EOUIPMENT TO PLACE A PLUO BELOW THE PACKER ACROSS THE GRAVEL PACK SCREENS. 4, ALLOW THE CEMENT TO U-TUBE INTO THE ANNULUS LEAVING CEMENT IN BOTH THE TUBING AND ANNULUS ABOVE THE PACKER. 5. RU SLICKLINE, RtH AND TAG AND RECORD THE TOP OF THE PLUG IN THE TUBINO, 6, RU AND PERFORATE THE 2 7/8" TUBINOAT A MINIMUM DEPTH OF 150'. MIX AND PUMP CEMENT FOR A 150' PLUG IN THE TUBIN~ AND TUBINO AND 7" CASING ANNUL US, 7, PLACE A 150' SURFACE PLUO IN THE ?"X 9 5/8" ANNULUS, 8. CHECK 9 5/8" X 16" ANNULUS TO BE SURE THERE IS CEMENT TO THE SURFACE,~,°~'/-~) ?/~D /..~iJE/...,,-°~ RI'I~, ,/./~.~. -7 ~, }'- ~/V,7- g. CUT OFF THE WELLHEAD. AND ATTACH AN ABANDONHENT MARKER., DUE TO EXPECTED FUTURE US~OF THE WEST SAK PILOT PAD, ARCO AL,~KA. INC. REQUESTS APPROVAL TO PLACE THE ABANDONMENT MARKER ,~r'~ouND LEVEL INSTEAD OF 4-6' ABOVE GROUND LEVEL AS SPECIFIED IN THE REGULATIONS. EXPECTED BOTTOHHOLE PRESSURE IS 1525 PS! ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 New Project's Engineering September 22, 1986 Mr. L. C. Smith Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Smith' Subject' WSP-9 State Well File Confidentiality (Revision) Enclosed is a data list for WSP-9 which has been voluntarily filed with the Commission by ARCO Alaska, Inc. As per section 20AAC25.537(b) of the State Regulations, ARCO Alaska, Inc. is requesting that this information be held confidential and not be released to the public access file. If you have any questions, please call Karl Privoznik at 265-6274. Sincerely, H. D. White Regional Engineer HDW/KGP: kjc'0004 enclosure cc' P. S. Baxter- ATO 551 W. E. Dobson- ATO 502 K. G. Privoznik - ATO 504 D. G. Rodgers- ATO 2086 R. L. Stramp - ATO 500 File: WSP-9 Well History RECEIVED SEP 2 5 1986 Alaska Oil & Gas Oont, C~omml~slo, ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany WEST SAK PILOT VOLUNTARILY SUBMITTED DATA TO BE EXCLUDED FROM PUBLIC FILES WSP-9 PRODUCTION LOGGING SERVICES RUN 1 7/7-11/85 RECEIVED SEP ~ ~ 1986 ~ 011 & G85 Cone. Oommi~ion Anchorage Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 New Projects Engineering September 19, 1986 Mr. L. C. Smith Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Smith: Subject: WSP-9 State Well File Confidentiality All WSP-9 data filed by ARCO Alaska, inc. is required by the State Regulations and is thereby subject to the September 24, 1986, release date. However, we do request that all production data still remain confidential as per Administrative Approval No. 191.2. If you have any questions, please call Karl Privoznik at 265-6274. Sincerely, H. D. White Regional Engineer HDW/KGP: kjc:0015 cc: P. S. Baxter- ATO 551 W. E. Dobson- ATO 502 K. G. Privoznik - ATO 504 D. G. Rodgers - ATO 2086 R. L. Stramp - ATO 500 File: WSP-9 Well History RE£EIVED SEP 1 9 1986 Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlantlcRichfleldCompany ~" STATE OF ALASKA '~-" (~L~' ALASKA L~iL AND GAS CONSERVATION CO,v[MISSION ~ WI=LL COMPLETION OR RECOMPLETION REPORT AND CONFIDENTIAL Classification of Service Well 1. Status of Well · OILX[~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-47 3. Address 8. APl Number P. 0. Box 100360, Anchoraqe, AK 99510 50- ~?c~-711¢)~ 4. Location of well at surface 9. Unit or Lease Name 1669' FSL, 2273' FEL, Sec.35, T11N, R10E, UM Kunar,,l< Riv~.r Ilni~ At Top Producing Interval 10. ~ell Number 1654' FSL, 1847' FEL, Sec.35, TllN, R10E, UM WSP-9 At Total Depth 11. Field and Pool 1644' FSL, 1745' FEL. Sec.35~ T11N. R1 IL. UM Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. West Sak 0il Pool Objective 122' RKB ADL 2~661: Al K ~71 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore ~ 16. No. of Completions 03/26/84 03/31/84 0R/2~/R~* N/~ feet MSLI 1 17. Total Depth (MD+TVD) 18.Plug Back Depth(M~D} 19. Directional Survey 20. Depth where SSSV set ~ 21. Thickness of Permafrost 4225'MD,4162'TVD 4124'MD,4062'TVD YE~ NO ~ N/A feet MD~ !500' (apprex) - 22. Type Electric or Other Logs Run Dil/FD~/~NI/CR~ CR/~L. NFn, Grave! Pack, Photon !og 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED .... .~,. ., ,v ~, . ~- ~. n~ c_ac c...~ ~12 ~ ...... . 24. Perforatians open ta Production (MD+TVD of Tap and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD} PACKER SET (MD) 3552~ - ~592" 3776~ - 3826~ 2-7/8" 3859' ~01 ~ ~622~ - ]662~ 38~~ - 386~~ w/8 spf, 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 366~ - ~67~ ~0° phasing DEPTH INTERVAL{MD) AMOUNT& KINDOF MATERIAL USED 368~ - ~69~ See ~el 1 HJ story attached to ~el 1 Completion ~700~ - ~720~ Report dated 2/6/85, ]756~ - ~766~ 27. N/A PRODUCTION TEST Date First Production ~ Methad of Operation (Flowing, gas lift, etc.) I DateofTest Hours Tested pRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ~GAS-OILRATIO TEST PERIOD ~ I OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Flow Tubing Casing Pressure CALCULATED Press. 24-HOUR RATE ~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None _V "'~":: ' ~:, /, ~.?¥, ,..~ * NOTE: Form 10407 Rev. 7-1-80 Well was recompleted 7/26/85. (WC1/024) CONTINUED ON REVERSE SIDE Submit in duplicate' . . GEd'LOGiCMARI~ERS . .' :. ,- .... 2 ~,' : -. ,FORMATION TESTS ' · r :- :; .- :.' - ?~ ~. -~ .. : - -. : : 2-. NAME ! I ~"~ t.~ I-'~ · ,~:lude interval tested, pressure data, all fluids recovered and gravitg, -:, Top West Sak 3550' 3495' N/A Base West Sak 3930' 3870' - , · · · . · .. . 31. LIST OF ATTACHMENTS Workover Well Hi story 32. I hereby certify that the foregoing is true and correct to the best of my knowledge . Signed ~ / TitleA~oo~_te E.n.g~geer Date '~-~7-69& .. INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. · Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), 'so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO Oil and Gas Company CONF-,LIEFJ J Lor,,. Initial Report - Daily Inslmctionl: Prepare and submit the "Initial Rfl~olf' on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. District Alaska Field Kuparuk Auth. or W.O. no. AYE 904864 Pool 102 Operator ARCO Alaska, Inc. Spudded or W.O. begun ICounty, parish or borough North Slope Borough Lease or Unit ADL #25661 Title - Recompletion API 50-029-21100 state Alaska JWell no, ws? 9 w/0 IARCO W.I. Prior status if a W.O. Workover JDat, 7/17/85 Date and depth as of 8:00 a.m. 7/[8/85 7/19/85 7/20/85 7/21/85 7/22/85 7/23/85 7/24/85 Complete record for each day reported IHour 1900 Hrs. 100% 4124' PBTD, Killing well 11.3 ppg NH~C1/KC1/CaCi~/NaBr Accept ri; ~ 1900 hfs, 5/17/85. Pull BPV. RU Camco, pull dummy @ 3345'. Displ well to 11.3 ppg brine. 4124' PBTD, TOH 11.3 ppg NHAC1/KC1/CaCI~/NaBr ND tree, NU~& tst BOPE.z Kill well & monitor. hgt. Total fluid loss = 275 bbls. Unlnd tbg & LD 4124' PBTD, Chg hole over to HEC 11.3 ppg NHaC1/KC1/CaClo/NaBr TOH w/pkr. ~TIH w/impre§sion block, tag @ 3829', TOH. TIH to 3800' · , rev circ, loosing fluid Fill hole @ 1/2 hr inte~als while treating surf vol w/HEC. Circ hole w/ll.3 ppg HEC treated brine. Accum fluid loss = 660 bbls. 4124' PBTD, Cir~ out fill 11.1+ ppg NHAC1/KC1/CaCi?/NaBr Rev circ; no-fluid loss.- TIH, rotate slowly & wsh out fill to 3878' (top of sump pkr), could not get thru pkr. Circ out fill. 4124' PBTD, Cln'g pits 11.3 ppg NHAC1/KC1/CaCI~/NaBr Stop circ, ~bserve well~ tag btm, no fill, TOH. TIH w/OS w/1-5/8" grapple, circ, wsh dn & att to catch fsh w/o success. (Fsh is part of logging tl left during prod logging.) RIH w/2-7/8" muleshoe, tag up @ 3878', att to wrk into pkr w/o success. Circ out trip gas thru choke. Circ & cln pits. 4124' PBTD, TIH w/lnr 11.3 ppg NH&C1/KCl/CaCi?/NaBr Circ hole w/cln filterea brine, TOH. pak assy. RU & begin rn'g gravel 4124' PBTD, TOH f/photon log 11.3 ppg NHAC1/KC1/CaCi?/NaBr TIH w/12 jt~ wire wrapped screen 50 gauge (top of fill @ 3859', pkr @ 3880'). Circ cln filtered brine above screens, pull up 30' & monitor well. Tag btm @ 3859', no add'l fill. The above is correct Signature For form preparation and dlatdl~utlon, see Procedures Manual, Sectiorr 10, Drilling, Pages 86 and 87. IDate ] Title ,'_,;:,'...:.::,:z O!i &. G-?ts 0o~';_ r' ~,~ r,-~ r, /', F;,.:~ ,._, urilllng ~uperlntendent ARCO Oil and Gas Company --" eONFIDENTI L Daily Well History-Final Report Inslructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged. Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. I Accounting cost center code District ICounty or Parish lState Alaska J North Slope Borough J Alaska Field ILease or Unit 1Well no. Kuparuk I ADL #25661 I WSP 9 W/O Auth. or W.O. no. |Title AFE 90'~4~64 I Recomp let ion Pool 102 API 50-029-21100 Operator ARCO Alaska, Inc. Spudded or W.O. begun IA.R.Co. W.I. 100% Date 7/17/85 Workover Date and depth as of 8:00 a.m. 7/25/85 7/26185 Complete record for each day reported · Old TD Released rig 0315 Hrs. Classifications (oil, gasOe'[_c~ Producing method F~. owing I otal number of wells (active or inactive) on this oat center prior to plugging and bandonment of this well I our I Prior status if a W.O, I 1900 Hrs. 4124' PBTD, Tst'g hgr 11.2 ppg NH4Cl/KCl/CaC12/NaBr POH w/tbg & gravel pak equip. RU DA, tst lub to 1000 psi. Rn - Photon gravel pak log f/3388'-3858', RD DA. RIH w/open ended tbg to 3345', CBU, spot 25 bbls HEC pill & monditor well, POH w/tbg. Rn 109 its, 2-7/8", 6.5#, J-55 8RD EUE tbg & lnd w/RR-2 pkr @ 3401', btm of gravel pack screens @ 3859'. 4124' PBTD, RR NH4Cl/NaBr Se~ BPV. ND BOPE, NU &tst tree to 5000 psi. Displ well w/diesel. RU S/L, rn gage ring, drop std'g vlv. Tst tbg to 4000 psi, tst ann to 2000 psi. Set BPV. RR @ 0315 hrs, 7/26/85. INew TO PB Depth 4124 ' Date 7/26/85 K nd of rig Rotary Type compl~t'~nt~.~ee, dual, etc.) Official res~l~iS~;arr~k Sands Potential test data Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct For form preparation and distrit~tion, see Procedures Manual, Section 10. Drilling, Pages 86 and 87. Drilling Superintendent ARcO A~asV, a, !nc_. ~o~ t00360 st Ottice ~' .... 0 Po -,.orate, Alaska ~5 Agggst 23, 1985 tte"cto~' chai~f~'g'~ ' 1~- _C. l~.%Ch:~d Gas ?~se~vat~°~ c°~iss~°~ ~ ~o~ec~, s~bseq~ent ' DeaY . {o~atio~ a~ p~ase treat this ~- ~otiCe [o~ ~ ~ ca~ p~ovide de~tia%' q~estionS o~ i{ ~e have any %{ ?o~ advise' p%ease 5i~ce~e%?, L~S :DDB: 6h~ 0029 RECEIVED Alaska Oil & Bas Cons. Commission Anchorage AP, CO Ataska, ~nc, is a Subsidiary o~ AttantiCB~'chiie~dC°mPan¥ STATE OF ALASKA ALASKA r'-- AND GAS CONSERVATION C~VlMISSION SUNDRY NOTICES AND REPORTti ON WELLS 1. DRILLING WELL I-1 COMPLETED WELL OTHER 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 84-47 :3. Address 8. APl Number P. O. Box 100360; Anchorage, AK 99510 50- 029-21100 4. Location of Well 1669' FSL, 2273' FEL, Sec. 35, TllN, R10E, UM At total depth 1644' FSL, 1745' FEL, Sec. 5. Elevation in feet (indi~te KB, DF, etc.) 122' RKB 35, TllN, R10E, [TM 12. 6. Lease Designation and Serial No. ADL25661 ALK 471 9. Unit or Lease Name Kuparuk River Unit 10. Well Number WSP-9 11. Field and Pool Kuparuk River Field West Sak 0il Pool 0bjecti Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: {Submit in Triplicate) {Submit in Duplicate) Perforate [] Alter Casing [] Perforations :~] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Arco Alaska, Inc. reports that no attempt was made to reperforate WSP-9 as stated in a Sundry Notice submitted on 7/3/85. After close evaluation of production logs, it was concluded that zone plugging was not taking place and therefore reperforation of the well was not necessary. RECEI'VED Alaska Oil & Gas Cons. Commission Anchorage 14. I hereby certify that the ~o~nd correct to the best of my knowledge. Operations Analytical Engineer Signed Title The space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date __ re ¢:nrm lt3-~1"1.'"{ Submit "Intentions" in Triplicate ARCO Alaska, Inc..~_-~ Post Office [ 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 August 14, 1985 Mr. C. V. Chatterton Commi ssi oner State of' Alaska Alaska Oil & Gas Conservation Commi ss ion 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: State Reports Dear Mr. Chatterton' Enclosed are the July monthly reports for the following wells' 2A-13 3C-10 2Z-11 WSP-20 11-11 2A-14 1R-10 2Z-12 9-31 12-3 (workover) 3B-12 1R-11 2Z-13 9-32 12-5 (workover) 3C-8 1R-12 2Z-WS#1 9-33 14-3 (workover) 3C-9 1R-13 WSP-9 (2) 11-10 14-5 (workover) If you have any questions, please Sincerely, Gruber Associate Engineer JG/tw GRU10/L120 Enclosures L1-14 L2-20 call me at 263-4944. RECEIVED lg85 Alaska 0J! & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AllanlicRichlieldCompany , ~ ~-- STATE OF ALASKA ~-. ALASKA ~,L, AND GAS CONSERVATION CO._ MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drilling well [] Workover operationX[~ 2. Name of operator 7· Permit No. ARCO Alaska, Inc. 84-47 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21100 4. Location of Well at surface 1669' FSL, 2273' FEL, See.35, T11N, RIOE, UM 5. Elevation in feet (indicate KB, DF, etc.) 122' RKB 6. Lease Designation and Serial No. ADL 25661 ALK 471 9. Unit or Lease Name Kuparuk River Unit 10. Well No. WSP-9 11. Field and Pool Kuparuk River Field West Sak 0il Pool Objective For the Month of Jul), ,19 85 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Accepted rig @ 1900 hrs, 07/17/85. ND tree. NU BOPE & tested. Pulled tubing hanger & 2-7/8" tubing. Retrieved packer. Washed over, fished, & recovered gravel pack screens. Ran 2-7/8" tubing w/tail @ 3859'. Set BPV. ND BOPE. NU & tstd tree. Secured well & RR @ 0315 hfs, 07/26/85. 13. Casing or liner rgn and quantities of cement, results of pressure tests None 14. Coringresumeand briefdescription None 5. Logs run and depth where run Gravel pack Photon log f/3388' - 3858' 6. DST data, perforating data, shows of H2S, miscellaneous data None 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. NOTE--Repo~on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed· [=nrm 1 n~n4 DRH/MR03 Submit in duplicate ARCO Alaska, Inc. Posl Office B~'-'~100360 Anchorage, A ,(a 99510 Telephone 907 276 1215 August 14, 1985 Mr. C. V. Chatterton Commissioner State of' Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: State Reports Dear Mr. Chatterton: Enclosed are the July monthly reports for the following wells: 2A-13 3C-10 2Z-11 WSP-20 11-11 2A-14 1R-10 2Z-12 9-31 12-3 (workover) 3B-12 1R-11 2Z-13 9-32 12-5 (workover) 3C-8 1R-12 2Z-WS#1 9-33 14-3 (workover) 3C-9 1R-13 WSP-9 (2) 11-10 14-5 (workover) L1-14 L2-20 If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRUlO/L120 Enclosures RECEIVED AUG 1 5 1985 Alaska 011 & Gas Cons. Commission1 Anchorage ARCO Alaska, Inc. Is a Subsidiary ol AllanllcRIchfleldCompany STATE OF ALASKA ~-~ ALASKA L..~ AND GAS CONSERVATION CO...MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drilling well [] Workover operationX[~ 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 84-47 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21100 4. Location of Well at surface 1669' FSL, 2273' FEL, Sec~ 35, TllN, RIOE, UM 5. Ele~;ation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 122' RKB ADL 25661 ALK 471 9. Unit or Lease Name Kuparuk River Unit 10. Well No. WSP-9 11. Field and Pool Kuparuk River Field West Sak Oil Pool Objective For the Month of June , 19 85 12. Depth at end of month, footage drilled, fishing jObs, directional drilling problems, spud date, remarks Accepted rig ~ 0700 hrs, 6/25/85. ND tree. NU BOPE & tstd. Pulled tubing hanger & 2-7/8" tubing. Retrieved pkr. Washed over, fished, & recovered gravel pack screens. Ran 2-7/8" frae string w/tail @ 3422'. Set BPV. ND BOPE. NU tree & tstd. Secured well & released rig ~ 1300 hfs, 6/30/85. 13. Casing or liner ru.n and quantities of cement, results of pressure tests None 14. Coring resume and brief description None 15. Logs run and depth where run None 16. DST data, perforating data, shows of H2S, miscellaneous data N/A 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. NOTE--Rep~/~t on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. ~ ~ n_4n4. GRU1 O/MR07 Submit in duplicate ARCO Ataska, thc. post Office Bo,, t00360 Anchorage, Ataska 99510 Telephone 907 276 1215 August 1, 1985 Alaska Oil and Gas ~ 3001 Porcupine Drive Anchorage, Alaska 99501 Re: West Sak SandS Pilot Pro_~ect, WSP-9 Dear chairman Chatterton: . a_~roval is subsequent Sundry . a confi- ion and pF ~ this notice as ..... .,. informat _ ~ease trean Attached Ior yv~on of WSP-~. ~* Notice for stimuz~* information, dential. I£ you have any questions or if we can provide further please advise. Sincerely, L. K. Smith .Regional Engineer LKS :BES :Pg: 0033 RECEIVED AUG 0 8 07 & 6as Cons. Commission ARCO Ataska, inc. is a Subsidiary °f-AtlanticRichtieldC°mpanY ..----. STATE OF ALASKA -- ALASKA L. _ AND GAS CONSERVATION CC MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL E3X OTHER [] 2, Name of Operator ARCO Alaska, Inc. 3, Address ?, 0. Bo× 100360; Anchorage, AK 99510 4, Location of Well 1669' FSL, 2273' FEL, Sec. 35, TllN, R10E, UM At total depth 1644' FSL, 1745' FEL, Sec. 5~ Elevation in feet (indicate KB, DF, etc.) 122' RKB 35, TllN, R10E, UM 12. 6. Lease Designation and Serial No. ADL25661 ALK 471 7. Permit No. 84-47 8. APl Number 50- 029-21100 9. Unit or Lease Name Kuparuk River Unit 10. Well Number WSP-9 11, Field and Pool Kuparuk River Field West Sak Oil Pool ObjectJ Check Appropriate Box Tolndicate NatureofNotice, Repo~,orOtherData NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [-J Repairs Made [] Other [] [] Other [] Pulling Tubing [] Pull Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The subject well was acidized 4/30/85 - 5/1/85 with the following treatment schedule: 2100 gallons of diesel 5000 gallons of 6% HC1 acid 10000 gallons of 6% HCL - 1½% HF acid 5000 gallons of 3%=NHoC1 spacer 7500 gallons of 6½% H~F4 acid The acid was placed and squeezed with coiled tubing. RECEIVED AUG 0 8 1985 Naska 0il & Gas Cons. Commission Anchorage 14. I hereby c.~rtify that the foregoing is true and correct to the best of my knowledge, ~. ~ Operations '.Analytical Engineer Signed ./~ Title Date ~'- Z- ~ ~' The space below for Commission use Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date __ ve Form 10-403 Submit "Intentions" in Triplicate 2nrl "Ruh.~eouent Reoorts" in DuDlicate ARCO Alaska, Inc. Post Office Bo )0360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 July 17, 1985 Mr. C. V. Chatterton Commi s s i oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Subsequent Sundry Reports Dear Mr. Chatterton: Enclosed are Subsequent Sundry Reports for the 2D-12 . WSP-9 If you have any questions, please call me at Sincerely, d. Gruber Associate Engineer JG/tw GRU10/L77 Enclosures following wells: 263-4944. ARCO Alaska, Inc. is a Subsidiary of AtlanticRichlieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL ~X OTHER [] 2. Na~i~Coi~ Q~era~or 7. Permit No. AlaSKa, Inc. 84-47 8. APl Number 3. Ad~res~) Box 100360, Anchorage, AK 99510 50- 029-21100 4. Location of Well Surface: 1669' FSL, 2273' FEL, Sec.35, T11N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 122' RKB 6. Lease Designation and Serial No. ADL ~25661 ALK 471 12. 9. Unit or Lease Name Kuparuk River Unit 10. Well Number WSP-9 11. Field and Pool Kuparuk River Field West Sak 0il Pool Objective Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing ~ (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Accepted rig ~ 0700 hrs, 06/25/85. ND tree. NU BOPE & tstd. Pulled tubing hanger & 2-7/8" tubing. Retrieved pkr. Washed over and fished gravel pack screens. Spotted 20 bbls HEC pill. P0H w/screens. to bottom. Ran 2-7/8" frac string w/tail ~ 3422'. Set BPV. ND BOPE. NU tree & tstd, Secured well & released rig ~ 1300 hrs, 06/30/85. Washed 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. The space belo~V for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Date Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. ~ Post Office Bo,, 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 July i, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive .Anchorage, Alaska 99501 Re: West Sak Sands Pilot Project, WSP-9 Dear Chairman Chatterton: Attached for your information and approval is a Sundry Notice for reperforation of WSP-9. Please treat this notice as confidential. Because we hope to begin this work early next week, I would appreciate a call to Tom Wellman at 263-4304 when it is approved. We will arrange for a courier to pick the notice up from your office. If you have any questions or if we can provide further information, please advise. Sincerely, L. K. Smith Regional Engineer LKS:RFS:pg:0078 Attachment JUL o ARCO Alaska, Inc, is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA -' ALASKA O~L AND GAS CONSERVATION CO~v~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Nj~(~f Ql:lerat~)r 7. Permit No. ~as~a, Inc. 84-47 8. APl Number 3.~dre~__. v. BOX 100360; Anchorage, AK 99510 50- 029-21100 4. Location of Well 1669' FSL, 2273' FEL, Sec. 35, TllN, R10E, UM At total depth 1644' FSL, 1745' FEL, Sec. 35, TllN, R10E, UM 6. Lease Designation and Serial No. ADL25661 ALK 471 5. Elevation in feet (indicate KB, DF, etc.) 122' RKB 9. Unit or Lease Name Kuparuk River Unit 10. Well Number WSP-9 11. Field and Pool Kuparuk River Field .~ West Sak Oil Pool Object e 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF' (Submit in Triplicate) Perforate [~ Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing [] [] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any ;oosed wor~ for Abandonment see 20 AAC 25.105-170). Alaska, Inc. proposes to reperforate West Sak Pilot Well WSP-9 using through tubing guns run on electric line. Exact intervals to be reperforated will be determined afte~ evaluating a production log to be run during a workover. No new sands will be perforat~ ed. A pressure tested lubricator will be used during perforating. After perforating, thei well will be flowed to tanks for cleanup. Expected start date: July 7, 1985 Expected completion date: July 15, 1985 ~,l~s~,~ Oi~ G G&s Go~s. Gomm'~ssio~ Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~'~.'roc yroj ect The space below for Commission use Date Conditions of Approval, if any: BY R~R~Y W. i~OGI. ER Approved by COMMISSIONER Approved Copy J~eturned By Order of the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 June 19, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: WSP-9 Dear Mr. Chatterton' Enclosed is a Sundry Notice proposing to perform a workover on the subject well. Since we expect to start this work on June 24, 1985, your earliest approval will be appreciated. If you have any questions, please call me at 263-4654. Sincerely, d'. W. Schmidt Project Dril ling Engineer JWS/JG/tw GRU9/L84 Enclosure ': EIVED JUN 2, 0 ].985 :.~ ,~:~., Cons. C0mmissior~ · ,~. , ~. ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ~ .... STATE OF ALASKA ALASKA _AND GAS CONSERVATION CC ivIISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL~i~I 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 84-47 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21100 OTHER [] 4. Location of Well Surface: 1669' FSL, 2273' FEL, 5ec.35, T11N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) RKB 122' 12. I6. Lease Designation and Serial No. ADL 25661 ALK 471 9. Unit or Lease Name Kuparuk River Unit 10. Well Number WSP-9 11. Field and Pool Kuparuk River Field West Sak 0il Pool Objective Check Appropriate Box To ndicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF' (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate J~ Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing ~ Other ,~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13~ Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc., proposes to perform the following workover on WSP-9: 1. Circulate the well with kill weight fluid. 2. Move in workover rig. Install BOPE and test to 3000 psi for AOGCC witness. 3. Pull tubing. 4. Fish the 3.38"0D gravel pack screens. 5. Run 3-1/2" tubing with packer. 6. Release rig. 7. Refracture. 8. Move in workover rig. Install BOPE and test to 3000 psi for AOGCC witness. 9. Pull 3'1/2" tubing. 10. Run gravel pack screens and complete with 2-7/8" tubing. 11. Release rig. Estimated Start: June 24, 1985 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sl~g~ed Title Project Dr'.' ~. ] -.'rig Eng~ neet The space b~ow for Commission use Conditions of Approval, if any: Approved by ORIGINAL SIGNED 6Y LO,litE C. SMITlt Approved Copy Returned By Order of COMMISSIONER the Commission Date Form 10403 GRU9/SN08 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. ,~ ~ Post Office B,._. 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 24, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: West Sak Sands Pilot Project, WSP-9 Dear Chairman Chatterton: Attached for your information and approval is a Sundry Notice for stimulation of WSP-9. Please treat this notice as confidential. Because we hope to begin this work early next week, I would appreciate a call at 265-6193 when it is approved. We will arrange for a courier to pick the notice up from your office. If you have any questions or if we can provide further information, please advise. Sincerely, L. K. Smith Regional Engineer LKS:CLC:pg:0044 RECEIVED APR 2 6 ]985 Alaska Oil & Gas Cor~,s. Cornmisslor, Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ~--. STATE OF ALASKA ,---' ALASKA ~ iL AND GAS CONSERVATION Ct..~IMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 84-47 3. Address 8. APl Number P. O. Box 100360; Anchorage, AK 99510 50- 029-21100 4. Location of Well 1669' FSL, 2273' FEL, Sec. 35, TllN, R10E, UM At total depth 1644' FSL, 1745' FEL, Sec. 35 5. Elevation in feet (indicate KB, DF, etc.) 122' RKB 12. TllN, R10E, UM r6. Lease Designation and Serial No. 9. Unit or Lease Name Kuparuk River Unit 10. Well Number WSP-9 11. Field and Pool Kuparuk River Field ADL25661 ALK 471 West Sak Oil Pool Object~ve Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data ! NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [~ Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.} 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to acidize the subject well with approximately: 2100 gal of diesel 5000 gal of 12% HC1 acid 10000 gal of 6% HCL - 1½% HF acid 5000 gal of NH.Ci^ spacer 7500 gal of HB~4 The acid will be placed and squeezed with coil tubing. PLEASE EXPEDITE OPERATIONS EXPECTED TO COMMENCE 4/29/85 RECEIVED APR 2 6 1985 Alaska 0il & G~s Cons, CorrllTlissiorl Anchorage 14. I hereby certify tha.t the $oregoing~is true/a/d correct to Signed ('~'~'~'//~// r~/~/~ The space belo~u/f/~r Commission use the best of my knowledge. Title Operations Analytical Engine~j~e Conditions of Approval, if any: Approved by Approved Co,p¥ Returned By Order of COMMISSIONER the Commission Form 10-403 : Rev. 7-1-80 and "Subsequent Reports" in Duplicate ARCO Alaska, In~: Post Office Box 100360 Anchorage; Alaska 99510 Telephone 907 276 1215 February 7, 1985 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Subsequent Sundry Reports - Various Wells Dear Mr. Chatterton' Enclosed are Subsequent Sundry Reports for the following wells: WSP-2 If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU4/L131 Enclosures RECEIVED F E g 0 8 1 B5 Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary o! AtlanticRichlieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL r-I COMPLETED WELL E]( .~. ',- ,: 2. Name of Operator ARCO A]aska, Inc. 3. Address P. 0, Box 100360, Anchorage, AK 99510 4. Location of Well Surface: 1669' FSL, 2273' FEL, Sec.35, TllN, R10E, UN 5. Elevation in feet (indicate KB, DF, etc.) 122' RKB 12. I 6. Lease Designation and Serial No. ADL 25661 ALK 471 7. Permit No. 84-47 8. APl Number 50-- 029-21100 9. Unit or Lease Name Kuparuk River Unit 10. Well Number WSP-9 11. Field and Pool Kuparuk River Fie]d West Sak 0ii PoD] Objective Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF' (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing '~[,~ Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). See attached Workover Well History for WSP-9. RECEIVED FEB 0 8 ]985 Alaska 0il & Gas Cor~s, C~r~jrn~sjO~ Ancho~a~2e 14. i hereby certify that the foregoing is true and correct to the best of my knowledge. The space below f~r Commission use Title Assoei~ Fnnln~r Conditions of Approval, if any: Date Approved by. By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1430 GRU4/SN73 Submit "intentions" in Triplicate and "Subsequent Reports" in Duplicate ARC° Alaska, Inc. Post Office Box ~00360 Anchorage, Alaska 99510 Telephone 907 276 1215 February 7, 1985 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' WSP-9 Dear Mr. Chatterton' Enclosed are the Well Completion Report and magnetic multi-shot survey for the subject well. If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU4/L134 Enclosures RECEIVED 0 8 1985 u~l & (~as Cons. Commisskm Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ...~.~. ALASKA,'. - AND GAS CONSERVATION CO /IISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL I-~X GAS [] SUSPENDED [] ABANDONED [] SERVICE [] -- :2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-47 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 02¢-21100 4. Location of well at surface 9. Unit or Lease Name 1669' FSL, 227~' FEL, Sec.~5, T11N, R10E, UN ~ ......... .~ Kuparuk River Unit ~ [CCATiOi'J.S 1 10. Well Number At Top Producing Interval I VFF~iFir-D 1654' FSL, 1847' FEL, Sec.~5, T11N, R10E, UM~.~ ~ WSP-9 Surf'~! 11. Field and Pool At Total Depth lB 1644' FSL, 1745' FEL, Sec.35, T11N, R10E, UM '- ' Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. West Sak 0i 1 Pool Objective · I 122' RKB ADL 25661, ALK 471 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 03/26/84 03/31/84 08/25/84I N/A feet MSL 1 17. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19, DiredtionalSurvey I 20. Depth where SSSV set I 21. Thickness of Permafrost 4225'MD,4162'TVD 4124'MD,4062'TVD YES ~ NO [] N/A feet MD 1500' (approx) 22. Type Electric or Other Logs Run DIL/FDC/CNL/GR, GR/CCL, NFD 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP . BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# H-40 Surf 120' 24" 200 sx CS II 9-5/8" ~6.0# J-55 Surf ~380' 12-1/4" 1350 sx CS Ill & 250 sx Class G 7" 23.0# S-95 Surf 4212' 8-1/2" 190 sx Clas~ G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) ~552' -"3592' 3776' - ~826' 2-7/8" See attached T~,bino Detail Sheet_ 3622' - 3662' 3844' - 3864' w/8 spf, ~664' - 3674' 30° phasing 26. ACID, FRACTURE, CEMENTSOUEEZE, ETC. ~684' - 3694' DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 3700' - 3720' See attached Work, vet Well History. 3756' - ~766' 27. N/A PRODUCTION TEST Date First Production I Method of OperatiOn (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATED .1~ OIL;BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. COP E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None RECEIVED F E 0 8 985 AlasKa Oil & Gas Cons. Commission Anchorage Form 10-407 GRU4/WC26 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE _ 29. ~ i'! ~?"-.' ~EOLOGI'C"' I~A~KEI~'S' ?~::;:~' ;- ;' ~?¥.~,~"~ ~'~ ~ ;' ~ -'%~:'-~'~ ~'--FORMATION':TEST~.~.,~ :~.:~.~-~ ~.~ ~- . - _~. ~; .~ ~.,~ ~' NAME Include interval tested, pressure data, all fluids r~over~ and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. . . , Top West Sak 3550t 3~95~ N/A . Base West Sak 3930' 3870' .'; ~ , - -. . . . . 31. LIST OF ATTACHMENTS ~{llin~ H{ ~n~y~ 32. I hereby certify that the foregoing is true and corr~t to the best of my knowledge INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service .Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to-be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation:. Flowing, Gas Lift, Rod Pump, Hydraulic Pump, SUbmersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 WSP-9 Completion Summary Accept rig @ 1630 hrs on 08/19/84. Bullhead kill well w/8.8 ppg NHjC1/KC1/CaC12. Set BPV ND tree. NU BOP. Pull BPV. Test BOP rams to 3000 psi, annular to 1~00 psi. Pull & LD 3-1/2" frac string. RIH w/overshot on 2-7/8" tbg. Rec. perf gun. POH. RIH & reverse out sand to 4124'. Circ and filter brine. POH. Ran GR/CCL gauge ring from 4118' - 3300'. RIH w/1-B sump pkr on WL. Set @ 3878'WLM. POH. RIH w/11 jts 12 gauge gravel pack screens and gravel packing tools. Stab into sump pkr. Set Wolverine pkr (upper pkr) @ 3455'. Gravel pack - stage #1, 18 bbls, 12% HC1 @ I BPM w/250 psi, 14 bbls mud acid @ 1 BPM w/200 psi. Move to squeeze position. Squeeze 4 bbls mud acid @ I BPM w/350 psi. Flush w/36 bbls diesel @ 1 BPM w/600-825 psi. Pump 12 bbls gelled diesel w/1 ppg, 20/40 carboprop @ 0.85 BPM w/825 psi. Pump 3 bbls diesel. Stage #2, 18 bbls, 12% HC1 @ 1 BPM w/825 psi, 18 bbls mud acid @ 1 BPM w/825-725 psi, 36 bbls diesel @ I BPM w/825-950 psi. 12 bbls gelled diesel w/1 ppg 20/40 carobprop @ I BPM w/lO00 psi, 3 bbls diesel @ I BPM w/lO00 psi. Stage #3, 16 bbls, 12% HC1 @ I BPM w/950 psi, 16 bbls mud acid @ I BPM w/950 psi, 36 bbls diesel @ 1 BPM w/950 psi, 12 bbls gelled diesel w/1 ppg 20/40 carboporp @ 1 BPM w/1100 psi. Displ w/brine. Gravel pack w/5 bbls gelled brine spacer followed by 32 bbls brine slurry w/8 ppg 20/40 carboprop @ 1-1/2 BPM w/250 psi. Sqz 5 bbls into form. Continue circ gravel pack. Pump 5 bbls post gel spacer, displ w/brine. Rev out & clean tbg. Press tst pack - ok. POH w/gravel pack tools. Ran NFD log from 3835' 3480'. Tag~fl3141 ~, 3835'. Ran 109 jts 2-7/8" 6.5#, N-80 EUE, 8rd tbg ~/Kobe cavity 20 Stab into pkr @ 3455' ~pace out 3' above pkr. Land tbg. Set BPV. ND B~P. NU tree & tst. Puil BPV. Displ well to diesel thru jet pump cavity. Drop standing valve & tst. Pump down dummy Kobe pump and tst. Release rig @ 0600 hrs, 08/25/84. KKL/100' tw O2/O5/85 West Sak Pilot #9 DRILLING HISTORY NU 20" hydr{1 & diverter and tstd same. Spudded well @ 2015 hrs, 03/26/84. Drld 12-1/4" hole to 3395'. Ran 85 jts 9-5/8" 36# J~55 HFERW BTC csg w/shoe @ 3380. Cmtd 9-5/8" csg w/1350 sxs of Cold Set III & 250 sxs class "G". Bumped plug w/1500 psi . Floats held - ok. ND 20" Hydril & diverter. Installed 9-5/8" packoff and tstd to 3000 psi - ok. NU BOPE and tstd to 3000 psi - ok. Tstd csg to 1500 psi - ok. Drlg. FC & cmt. Drld FS & 10' new 'form. Tstd form to 13.5 ppg-EMW - ok. Drlg 8½" hole to 4100'. Ran logs DIL/FDC/CNL/GR f 4098' to 3380'. Cont drlg 8½" holes 4225'TD as of 3/31/84. Ran 95 its 7" 23# S-95 BTC-csg w/shoe @ 4212'. Cmtd 7" csg w/190 sxs class "G". Bumped plug w/2500 psi - ok. NU BOPE. Installed 7" packoff and tstd to 2500 psi - ok. NU tree. Secured well and released rig @ 1600 4/1/84. DH124 4/16/84 ih CASING I TUBING I LINER DETAIL DRILL DATI= ARCO Alaska, InD. - #ITEMS COMPLETE OI~CRIPTION OF EQUIPMENT RUN LENGT~H DEPTH _ . . .g,/..,e ~,~,~'._ i · . i . //~ ,:'rA . z~l,~" I~.~ '* ,~,_ ~o ' ~~ g~ ~~~ - _,~. ~ _x~ ~ /_~ , ,~, . g~/~ X~R.~ ~r~ ~7. ~.~?.~.,.~~t.~t _. ~.~ ~~ ~ -- a~ ~ / ...... _.. .... , , .... .. , , ARCO Oil and Gas Company Well History - Initial Report- Daily InlbuCfion~: Prepare and submit the 'lnlUal Repe~' on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. District ICounty. parish or borough Alaska I North Slope Borough Field ILease or Unit Kuparuk River -~~ O,I ~i I ADL t/25661 Auth. or W.O. no. ITitla AFE 103438 I Drill, Complete & Perforate Alaska ell no. SP #9 Operator IARCO W.I. Prior status if a W.O, ARCO Alaska, Inc. Spudded or W.O. begun IDate IH°ur Spudded 3/26/84 2015 Hrs. Date and depth as of 8:00 a.m. 3/27/84 3/28/84 3/29/84 3/30/84 3/31/84 Complete record for each day reported 16" @ 120' 1375', (1255'), Drlg Wt. 9.2+, PV 21, YP 29, PH 9.5, WL 10.4, Sol 5 Accept ri~ @ 1600 hrs, 3/26/84. NU diverter lns. 2015 hrs, 3/26/84. Drl 12¼" surf hole to 1375'. Spud well @ 16" @ 120' Drl & surv 12¼" hole to 2758' 1653', Assumed vertical 1842', 5.9°, N88.9E, 1841.75 TVD, 9.72 VS, .19N, 9.73E 2322', 17.0°, N88.5E, 2308.41TVD, 118.63 VS, 6.69N, 118.68E 9-5/8" @ 3380' 3395', (637'), Bump plug Wt. 9.8, PV 25, YP 10, PH 8.5, WL 8.4, Sol 8 Chg BHA to drop angle, RIH, drl 12¼" hole to 3395', 20 std short trip, C&C hole. RU & rn 85 its, 9-5/8", 36#, J-55 BTC csg. M&P 1350 sx CS III @ 12.2 ppg. Tail in w/250 sx C1 "G" w/2% A-7 & .2% D-6. Displ w/130 bbls using rig pmps. CIP @ 0540 hrs, 3/29/84. Bump plug. 2828', 18.1°, S87.9E, 2790.24 TVD, 273.04 VS, 10.93N, 273.10E 3364', 8.9°, S85.1E, 3311.32 TVD, 396.71VS, 6.82N, 396.15E 9-5/8" @ 3380' 3405', (10'), Cln'g pits Wt. 8.9, PV 10, YP 5 ND 20" & diverter. NU & tst BOPE to ~000 psi, tst csg to 1500 psi. RIH w/bit, tag up @ 3288', DO FC, cmt, FS + 10' new hole. Conduct leak-off tst to 13.5 EMW. 9-5/8" @ 3380' 4100', (695'), Logging w/Schl Wt. 9.7, PV 20, YP 17, WL 4.2, Sol 14.5 Displ hole w/Oil-Faze mud, C&C. Drl & surv 8½" hole to 4100' P,n DIL/FDC/CNL/GR. 3719', 8-3/4°, S86-1/2E, 3662.11TVD, 451.07 VS, 2.83N, 451.10E The above is correct Signature For form preparation and distrib~on, see Procedures Manual. Section 10, Drilling, Pages 86 and 87. RECEIVED F E B 0 8 1985 Ataska Oil & Gas Cons. Commission Drilling Superintendent 100% IDete 4/26/84 AR3B-459-1-D INumber all daily well history forms consecutively [P~ge no. aa they are prepared for each well. ARCO Oil and Gas Company .. Daily Well History-Final Report Instruclions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned Or well is Plugged. Abandoned. or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an olflcial test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operalion if space Js available. Accounting cost center code District ICounty or Parish State Alaska I North Slope Borough Alaska Field }Lease or Unit Well no. Kuparuk River - ~3e~ f~Ci~~] ADL #25661 WSP Auth. or W.O. no. ITitle AFE 103438/ Drill, Complete & Perforate Operator ARCO Alaska, Inc. Spudded or W.O. begun A.R.Co. W.~. 100% Date 3/26/84 Spudded Date and depth as of 8:00 a.m. 4/01184 4102184 Complete record for each day reported Iotal number of wells (active or inactive) on this Dst center prior to plugging and ~ bandonment of this well I our Prior stalus if a W.O. 2015 Hrs. 7" @ 4212' 4225', (125'), ND BOPE 8.9 Invert oil Fin logging f/4098'-3380'. RIH w/12¼" BHA, drl to 4225', circ hole cln, POOH. RU & rn 95 jts, 7", 23#, S-95 BTC csg. M&P 190 sx C1 "G" w/2% A-~ & .2% D-6 @ 15.9 ppg. Displ w/8.9 ppg invert oil fluid. Bump plug. Full ret's & recip pipe thruout. CIP @ 0445 hfs, 4/1/84. ND BOPE. 7" @ 4212' 4225' TD, 4124' PBTD, RR 8.9 Invert oil ND BOPE, instl pack-off in csg head & tst to 2500 psi. tree. RI{ @ 1600 hrs, 4/1/84. NU Xmas Old TD New TD Released rig Date 1600 Hrs. Classifications (oil, gas, etc.) 0il Producing method Flowing Potential test data 4225 ' PB Oepth 4/1/84 Kind of rig Type completion (single, dual, etc.) Single Official reservoir name(s) Kuparuk Sands 4124' Rotary Well no. Date Reservoir Producing Interval Oil or gasTest time Production ~)il on test Gas per day Pump size, SPM X length Choke size T.P. C,P. Water % GOR Gravity Allowable Effective date corrected The above is correct Signature For form preparation and distribution. see Procedures Manual. Section 10, DHIling, Pages 86 and 87. I Date Title Drilling Superintendent AR3B-45~3-C Alasi(a 0il & Bas Cons. commission Anchorag~ i.a they are prepared, ..... h well. Dlvldo~ of AtlanllcRIchfleldCompany ARCO Oii and Gas Company" Well History - Initial ~eport.-~Daily Inltrucflonl: Prepare and submit the "Initial ReDort" on the first Wednesday after a wall ia spudded or workover operations are atto'ted. ~ i~i~ :i ~ '~= ~ Dally work prior to spudding should be summarized on the form giving inclusive dates only. ~:~,.~: .: ~.~! ~*~;:' !~'!' ~.~,j District County. parish or borough I State Alaska North Slope Borough I Alaska Field Lease or Unit IWell no. Kuparuk River-G.~~C~I ADL #25661 ~SP Auth. or W.O. no. ITitlo AFE 103438 I Complete Operator ARCO W.I. ARCO Alaska, Inc. 100% SpuddedorW.O. begun iD~e I,our Proretalua,faW.O. Completion 4/15/84 1500 Hrs. Date and depth as of 8:00 a.m. 4/16/84 Complete record for each day reported 7" @ 4212' 4124' PBTD, 4225' TD, ND BOPE 8.9 Invert oil Accept ri~ @ 1500 hrs, 4/15/84. ND Xmas tree, NU &tst BOPE to 3000 psi. RIH w/Bkr shear out sub, 109 its + 2 pup jts, 3½", 9.3# AB Mod, J-55 tbg & ind. ND BOPE. RECEIVED F E B 0 8 1985 Alae~a Oil & (~as Cons. Commission Anchorage The above is correct Signature For form preparation and-dj~lrribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. Date 4/26/84 Title Drilling Superintendent AR3B-459-1-D Number all daily well history forms consecutively as they are prepared for each well. [P~ga no. ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned. or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official lest is nol required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. ~.l. aska County or Parish LIl,~'~- ~ L ...... Unit Kuparuk River- O'~ ~q:z~l AFE 103438 Title Accounting cost center code State Alaska Auth. or W.O. no. North Slope Borough ADL #25661 Complete IWell no. wsP #9 w/o Operator ARCO Alaska, Inc. Spudded or W.O. begun Completion Date and depth as of 8:00 a.m. 4/17/84 A.R.Co. W.I. Date Complete record for each day reported 100% 4/15/84 Iotal number of wells (active or inactive) on this Dst center prior to plugging and bandonment of this well our Prior status if a W.O. 1500 Hrs. 7" @ 4212' 4124' PBTD, 4225' TD, RR Diesel NU Xmas tree & tst to 5000 psi. Displ tbg w/diesel to Bkr shear out sub. Set pkr @ 3438.26 D?M & tst. RR @ 1200 hrs, 4/16/84. See attached for additional frac information. Old TO New TD Released rig Date 1200 Hrs. Classifications (oil, gas, etc.) Oil Producing method Flowing Potential test data 4225 ' I P. Depth Kind of rig 4/16/84 Type completion (single, dual, etc.) Single Official reservoir name(s) Kuparuk Sands 4124' Rotary Well no. Date Reservoir Producing Interval Oil or gasTest time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % CDR Gravity Allowable Effecllve data corrected The above is correct Signature Date Title Y~_.?-~ _~__~-~7 4/26/84 Drilling Superintendent see Procedures Manual~7' 10, ~ Drilling. Pages 86 and Section R AR3B-459-3-C r,,,,, ~. .... enm~lftSSt0~ Aias~8, 0[I &uae Wm~1~§r a'l'l"~aily well history , ........... ,,vely i Page no. _ I_a.s..[Pxey are prepared for each well. Anc¢o[ag~ 2 DlvlI~len Ct AllanllcRlchfleldCompen¥ WSP #9 4/19/84 7" @ 4212' Pkr @ 3438' RU to Perf Clr loc. Start RU of frac tanks & flow tank. RU D.A. 4/20/84 7" @ 4212' Pkr 3438', Fill 4123', WO Halco Tst tanks & frac tanks. Perf w/DAusing 2-5/8" jumbo jtguns. Shoot ea. interval twice = 8 SPF w/30© phase. 3844'-3864', 3776'-3826', 3756'-3766', 3700'-3720', 3684'-3694' (TD = 4123' WL). Flow tst. Tag fill @ 4123~ RD DA. WO Halco. 4/21/84 7" @ 4212' Pkr 3438', Fill 4123' Geli Up Call out Dowell for frac. Move in sand silos & fill w/60,000# 20/40 sd. Move in turbos, blender, CU & pmp truck. RU same. Fill tks w/ 400 bbl diesl & gel up. RU surf lns. 4/22/84 4/28/84 7" @ 4212' Sd 3870' Pkr 3438' Move to WSP #7 Press tst @ 3500 psi. Frac: Press ann @ 1000, start diesl pad @ 0847 hrs. Est br dn = 1300, pmp 90 bbl pad @ 12 BPM & 1300 psi. Stg #1- 12 BPM, 3 ppg 20/40 carboprop, 1150 psi. Stg #2- 12 BPM, 6 ppg (10,080#), 40 bbl gel, 850 psi. Stg #3- 83 bbl, 9 ppg sd ~%.~0#), 12 BPM, 7~O psi~~ Displ w/30 bbl gel to spot sd 9 bbl abov perfs. ISIP = 750. Frac in place @ 0916 hrs. Pmpd 340 bbl gel by tk strap & 53,000# sd_+ by strap. RD DA & tag fill @ 3870' (6' below btmperf). RD DA & move WL unit to WSP #7. ~ ~o~,q ~$~$~O~),~ Prep to Dump Sd Prep to move in Dowell & dump sd to cover lwr perfs of W Sak. 4/29/84 7" @ 4212' 4123'PBTD, Prep to Attempt to Fsh Perf Gun Move in & RU Dowell. Mix & ~mp 45 sx 20/40 mesh sd 4500#. Displ w/diesl to clr tbg %ail @ 3454'. Shud dwn, let sand settle out. RD Dowell. Move in & RU DA. RIH tag sand @ 3695'. Top perfs of lwr W Sak not covered f/3684'-3694'. RU to perf upper W Sak. Run #1 - Perf f/3672'- 3642' 4 SPFw/2-5/8" jumbo jt. Rn #2 - 2nd rn to perf 3672'-3642', 4 SPF-8 SPF total shot density - 30'. Lost gun when pulling into lubr. WO overshot. Will attempt to fsh gun. Top of gun 3657'. Sand was dumped to cover perfs in lwrW Sak after frac job f/3870'-3682'. Calc. amt 188'. 4/30/84 7" @ 4212' 4123'PBTD, RU to Frac Upper W Sak Att~npt to fshperf gun w/DA overshot on WL. Unable to get on fsh. Ran CCL to try & locate top of gun. Perf gun appears to be in sd w/CCL loc @ 3790'. RndunTny gunw/CCL to tag fill. Fill @ 3672'. No indic of gun thru upper W Sak frac zone. Contperf upper W Sakw/8 SPFw/2-5/8" ~jumbo jt 3672'-3642' - 30'. 3642'-3622' - 20'. 3592'-3552' - 40'. RD L/DA. Call out Dowell frac equip. RU to frac upper W Sak. 'Naska Oil & Gas Cons. commission Anchorage WSP ~9 (Cont.) 5/01/84 7" @ 4212' 4123'PBTD, Prep to Tag Fill w/Slick Ln Fin RU for frac job. Gell up diesl. Press tst ins to 3500# psi. Begin frac job. Pmp 175 bbl pad @ 12 bbl/min w/brkdwn @ 1620# psi. Pmpd 3 ppg sd slurry @ 12 bbl/min 1410#-1180# psi, 89 bbl slurry 10,080# sd. Pmpd 6 ppg slurry @ 12 bbl/min 1180#-1040# psi 99 bbl slurry, 20,160# sd. Pmpd 9 ppg slurry w/RA sd 12 bbl/min 1050~-940# psi, 277 bbl slurry 77,284# sd. Pmpd 9 ppg slurry WO/RA 12 bbl/min 980#-920# psi, 27 bbl 7500# sd. Displ frac sd to leave top of sd @ 3548'. Calc. w/24 bbl flush. Final press 1160# psi. Est approx 111,880# sd in formation w/3144# left in csg. Frac in place @ 1114 hrs. Shut well in, allow gelled diesl to brk for sd to drop out. Unable to RU to tag fill due to Rig #102 move. Will tag fill this AM. 5/02/84 7" @ 4212' 4123'PBTD, Well SI; Waiting to Tag Fill Well SI. WO Camco to tag fill after frac job. Camco tied up on SWP #15I & 5. Calc. top of sd 3548'. Tbg tail @ 3454'. Est top of gun @ 3790'. 5/03/84 7" @ 4212' Well SI RU Camco. GIH w/WLbailer. Tag sd @ 3329', bail to 3380' w/several bridges present. Cont bailing to 3460'. RD Camco. Well SI. WO Rowan #41 to move off. All bailer rns full of 20/40 carboprop. 5/10/84 7" @ 4212' Well Ready to Flow Tst Haul diesl. Gelled up dieslw/Dowell 650 bbl. ~ve in & RU FracMaster CT. Tst BOP's & tbg to 4125# psi. RIH w/CT clnout to 3770', approx 20' above TOF. Btm 74' of perfs still covered w/frac sd. Circ cln diesl while TOH w/CT. Secure well. Ready for ops to flow tst. Pmpd 410 bbl gelled diesl, pmpd 75 bbl cln diesl. Eastman/ REPORT of SUB-SURFACE DIRECTIONAL SURVEY ARCO ALASKA, INC. COMPANY West Sak Pilot, Well Number: 9 WELL NAME North Slope~ Alaska LOCATION JOB NUMBER A0384S0252 TYPE OF SURVEY ~.~s R ECEi V£D F £ ~ o 8 1985 41aska Oil & Gas Cons Commission Anchorage' DATE 29-MAR-84 SURVEY BY OFFICE B JAHN Anchorage, Alaska Eastman Whipstock A PETROLANE ~ DATE: April 24, 19~4 (907) 563,3650 ' P. O. Box 4-1070/Anchorage, Alaska 90509-1§70 ARCO ALASKA, INC. P.O. BOX 360 Anchorage, Alaska 99510 Well Number: West Sak Pilot, Well No: 9 Location: Kuparuk Field, North Slope, Alaska Type of Survey: Magnetic Multi-Shot Date: 29-MAR-84 Method of Computation: Radius of Curvature Surveyor/Driller: B JAHN Job Number: A0384S0252 A~t.n: Mr. BILL CONGDON Dear Mr. Congdon, We are enclosing the original and one copy/copies, of the Mag. Multi-Shot survey run on the abOve mentioned wetl~ To date, the following distribution has been accomplished: A. 1 copy/copies delivered to drilling for in-house · distribution. B. 0 copy/copies for noted oil company representatives~ C. 3 copies for E/W permanent well files. . We wish to take this opportunity to thank, you for using ' Eastman Whipstock and look forward to being of service in the future. ,~/~t' e, ].y Techni al Coordinator Distr ~c~f c cc/file Directional Drillers/Sub-Surface Surveyors/Instrument & Tool Rentals/SaJes/Woddwide ARC'O-- ALAS~2;A .... I-.NC. ............ t4 rS: ':'S'I' S A K P I L 0 T -, W E L L. N 0: 9 M M S J 0 B N 0 ': A 0:3:3 4 S 0 2 5 2 KLII='AF~I_IK FIEI_D~ NORTH SLCiF'E~ ALASKA C A M E R A N 0: 1 ~, 4 4 / 14:3:3, A. ]...i. N 0: 10'P&, / 7 4 A SURVEY TAKEN FROM ROTARY ......................................................................................................................................................... · _BEE;_~'.(D _,£!.E"_ _S.U~ ............ ' i JS OF 'F:UiRV~TURE METHOD RA[ II KLIF'AF',:LII< F'IELD~ NORTH SLOF'E, AI_ASKA C:OMF'LI'FATIFIN F::'Af':~E:.' NO. ' 1 'T' :[ M I.'7,. Ii A'I"E , ' 1 ::-:: 41:._,,.':' =:; 2/.I.-' A F'R "- ::-: .4 TRL.IE MEA'.E;UREI) DRIFT DRIFT C:f]I_IR'.:_;E VERTICAL VERTICAL SUB'.BEA R E C T A N i--; U I_ A R C L i-.~1 S I._1 R E DEF'TH ANGLE DIRECTION LEI,.IGTH DEPTH ._,E_.TION I'VD i]: CI CI R D I N A' 'T E '.:': DISI'ANCE DIF~Er':I"IF~I,,I Fi;l:ii:VEt':~.IT'v' .... E E.E;T_ ........... [2 M D M FEET ,FEET FEET FFi.'ET FEET FEET D I"1 Ii(."..;/1 (-)C)F'"I C:, .. c) 0 0 () (). 0.00 0.00 - ! 22 ,. (} O, ii. O0 c).. F) O O. ('~ a, 0 (-) 0.00 ,::,/-' 0 0 0 0 :::6 · :::60C) 0 00 -3/... 00 C) · O0 ('). ,['~0 0. C:,O 0 0 0.00 ............... ~'.,,,,t ,,,t ~ _.. : r - -- # · ..... ' c'). 1 '.-.-; N 0,. 07 E (]. 2:0 N 2,F) 0 Ii; 0. :27 0.4:?) N 0...'2:2 E-_- 0,, 59 N :3:3 18 E: (). 17 (-~ =,- ......... .c,.~ N O. 71 E O.'P:;;: N :"-',0 28 E] 0 1!=; 178.00 O, 07 56,00 270.00 0. :32 14 :::. O0 ':'/- ':: 00 0 71 :241 (:)0 ...! _, .,.~1 · ,t · 4._.. O0 z,=',:: 0 :::0 N '-"-' 0 E 92 .=;,.~ ' r--'; z 7 ............... O._LS_.H_6./'--, ....... _Q_E__ 9'2,. .=;-,4/-,. '-.:;'c~ 6:7.:.:".]). 0 15 hi 4:3 C) E t-72. 63:::. 99 75:1. C) 1._, = N '-'...' ,:,'-'C) E 9. 2 . 7:3 C) .9'~ ' ........... '2 '£ :"2 ..... : 5 '.-.-~ 2 ,q o .-, 'FY 9 :...:...'...,. () 1. N 16 () W ~-~.~ 1·31. :]:5::::. 00 0.59 N 1.:3:L E 1,8':.-~ 424. 'p'.-7~ O. 7'2 N 1.90 E 2 o.r., P]16. ,-'.!9 O. ~= - ' - · .. ~ ..... ;~._, N Z. ~'.'.." E . . ':1.._, E · 2.45 60:__.:.~:9 I 2:8 N :2 ":' 49 7(')0. '-'- -- , ~ :Y 1 · 67 hi 2..=;(') E 1.44 N 65'; .5'7 E: 0.27' 2.0:3 N (':,'.:.) 12 I'.'.'~. () .:, 2.4.2: N /:6, 4.8 E: 2.7'7 N,.-,/'""'.. :;:"'"-¢.. tie 3.00 N 56 14, [ii: O. i .1. C) ,, ()'7 (), ';.:: () :]:'7, 87 'E 5'!?, ,'.:, :'"i: E F...: 5 ,, 2!15 E :38.09-' S :!:::3 4.ti. E: :3 ,, 8 0 5'Y;..96 ::i; 84. I E:. :3. 1 !:) '::'=; 60 S :34 4,6 Ii,:. 2 i;::/..': ,,.j, ._.. a "::" .':";:' :::: , 17 1'-.." :":'; '-"' 0 E ,::.,:':: .':,.':,,-, ........... ,::,,:.:, .... . .....- ,=, 4 .94 11 ,~.o 76, ,:'"' .1. 62 . S/4 E: . .-'FY C) S 11 ':' 7:3 ...... . ,-, ~- -, - '- m'~/""', '-' '"" '--' '- ~. ..,!' "~" '''''~,.) · ,--, ,--, ,~'d *-m I=.' ' ,-, ,::,,:, ,,~a.~.~:..' 9.. 72 '.5' l:2t'!;:' :ii!:/; E :;;i: .,.1, ::J: 2,, .1.7 1.2 S 89 (')_ E ,:r':,..... · 24.6,(") .76 167 .01' .~.'-'°':'c' ............... .76 lO .5:2. c. 16/:", . 'i;'¢7 E ......... .... ,: :5 1.4. 7:.=..: F' :2:5'7.4, 18 (') S 8 :.--: :]:r) E 92 '-." ?'] 4. a 4. 5 194,82 24. 26.45 , 1 c) ':~'-' - 9 . 17 .:..,..L':,'..~,.-, ...... 11 ..... · ":,/. x/ t'7 ~;a ,=: ::,,.--/ ":'0 E ---'::"-.'2L, ~i '_-7,'~: ~.'2::::. ' ....,=-..:, ,:o ' ,4':'." o ~,:'~,~ ].2 E I ................................................ ~L ' '',, ,' 14(") ' "" 1,::, '.E; :::',/- 1 Ii.:_' 1/_",7,2::-': S :.:.:6, ::_:..:::7.: [!:' 1 ,r,,,-. "),'-, ; .:, (.. ,::, :i:; :iii',./..:, 4'7 """"-' ,:,7 4. [::' ,:;.,:: .=, ,, 4.1. :.:.': '-'- (). ]. 6 (). 1 'i;.' I-::;I..IF'ARI..II< I:' I ELL], NOR]'H '.:;LOF'E, ALA'SKA C: C[ M P U T A T I 0 N T I ME [[ATE 1:3: 41." .:,'-"=._, 2 4- AF:'R-8 4. I::'AOE I\10. 2 · ' TRUF MEA'.~.;L.IREI'~ DRIFT DRIFT C:OI_IRF:E VERTIC:AL VERTIC:AI_ SUBSEA R E E: T A N G U L A R C: L..0 S U R E: DEPTH ANGLE DIRECTION LEI`4GTH I]EPTH SEC:TIOIXl TVD C 0 0 R D I N A T E S DI'.:::TANCE. DIRECTIOr, I E;EVERI'T";" ..... FEE]'. ........El___ld .......... B_._EL ....... EEET FEET FEET FEET FEET FEET 2 7'.5 :F:. 1 :--: · 6, S 8 8:3 0 E 9 2. :2 7 2 :z:. 4 7 2 51.5 9 2 6 01.4 7 1 1.91 :E; 2' :5 1. 5 4 E '-'." 51.8:2: S 8'7 17 E:' (). 4. 0 ..... ,= ') . 779.94 '~'/-'::F: ' :Z...'~.'9~ F:9 E 280. 1 '7 ..E: :.~Z_2-"~...E; .......... ~!....~:.'Z_. .......... o~,t ..... 1Z_-4:-EL_S ::J? E:(') . F 9?. '..'/::; 1 (') '9~.~ ....... _ __, 'T./'F; · 12.41 :E; _ . _. .... 2'? 4. :}:: .1. = 3 0 1'4 9(') (') E ':'-'::: :;-2 9 0 0.0'~ :3 C) 6, 5 9 ' 2 7 7 8 0 9 12 ~ 2 S ::C)/-, 5 4 E :::(')/-, 7 9 S ',F::'7 ,.1-(') lie 2 4. 8 · ...I _ . .- .q i . . , mi. . _ _ _.m .... m · 3035. 14. 0 Ix[ 90 t') E "--~2. ........ 's"--.~ :': C/ 06 '-'""-,o0. 01 2E:/:.7~ 06 12.52 S F:29.96 E ':' 12'2' ......... i?.:_'__F:~_N_'-20 ..... () .E .......... ~'.~2. L::07:-_-4 ~'~ .'::~ 1 18 '-"--~'-' ..... '-~ ="" '-' '-'~=~ ~ '-' "- '-'~ .... "= ':- ................. ~ ...,c .... , ;, , ...... :, .:, .... ,. , .-' c. .:...., .~, ..::,._, :~; :T:: 7 .:,7 E 1.52 · .::,~],'? 11 6 :_--; 8::: F:(') E 92. ,::168.62 '370. C)7 :2:046 /-',2 12.77 S 370.¢)1 E :370.~''-'' ::: :E:8 .1. E: 1.d',i.,' -'", .-m ~, ... "' ~a . ""' '"; ......... 3231 .... 10- 1'.-' S 88 (') E ~ "~'-,'.',':~ .~.=, :'~:-31 ~":' ::~ 1(')7. 55 1 ."-~. 1 ;..'.' '=' ':":' _1. 4.7[-_' :2:::: 1 69 :3:,: :2_IE ............. L,._~ ......... ,:,,:,l::. 26 314.5 9. 7 13 33 o .:, o,:, 3320 "-.Y 42 c-._, ::,,:,-,,-, .'::0 E-. :::9 ::42/',7. 'F/7 "'"'-' . ' . ._, 3 ::'::': ,20 E ........... 4 :-_': E: 88 2 E .1. , :':::("~ .86 c:'.-'l'P :_:6 13.6/_) :'; 401 0::: E 401 26 ~" '""- :3 Ii.'.-. ~'~./4.~"~ :3':: 9."'q, 1 () 0 S c.,,:, .-,F ' 'i . '~'" . .. . ............. :., ..:, .} E 7._, 3:341 401 L ,-~ ...... -:, ,.-.'::: - · -', .-' ,--, ,.- - ~'. ,-, .-, : o _ _ _ _- , __ i '-'"'/'" 7.!7 1 :::. ~y7 ':' __4J~2_E____.4.£}8.3/:, '.:;_B::: ..... 2..E .......... ,~_,i..~:'":' '=:,., ............ .:,14.:',,=, ............. ';.z____lJ_.,:~__,:,~~L3. :::?,:::z; ~,7 4('hc'-: 17 , i,.:,..' :;, ~: ....... . 4.94..~. .... F:i; .::.7:37 [:_"; O, 6 2: F' R 0 ...I EE C'I" E: lEI ]" Ci F'B T lEI i'""1" ':"':' 31 ':' .=; 1 .::,, ':":' E ~'~ 1 ::: 91 '.E; ,::, 7 2 zt [ii: (") ( 9 4,, 4 0 6,2, C) 7 5 ! 3.4 8 ' 3 9 4 C). 0 7 .,:. ....................... ...... F · ' "-' :.=:7 q'-' F:' I NAI_ -:L i-i::;I IRE- D I RIEC:T I JN. .=, DEl_.=, 14 M I I',.1'..=: /.I.L~_ .=,,.-:..ti-.,-.=. .... =, E _I~]"6.!%:E~_ ..... ='"'":" '-'= ..,.4,=,., ::,.;;, FEET W E '-E;'T' '.?.'; ~ I< P ! L FI T., W E L L N r'~ -- ..--:'... V1M':-.; .j f'f 'R N f']: ~ 0 3 8-'1-'.:; 0 2 5 2 t< I...I F'A R UK F 'f E L D -, N rjr TH '.::;/OI:::'E, AL A SI< ~ I'"IM;:Z,, C),_4..124 MB? '.]-;URVEYCIR: B ,JAI.41',I, DATE RUN: 2'.::'¢-HAR-:--':4 rZ:AMERA NO: 1644/1488, A. I_1. hlA: 1096/74A '.BURVEY TAKEN FROM ROTARY , A PETROLANE COMPANY -W E S l~.-;, A k--F-IL :ET~,__WF,,LL--NELL 9 MJ~1S , K IJ F' ~'~ R I...I].::: F' I E L D, I',10 R T 1-4 '.:=:l._ 0 F' E, A L A :.:;I-::: A F:: i")H I::' I...l"l" (-':l T I 0 h,I .T T i'lF f) A T E 1 :-.:: 42: 16, 24--AF'R-84 F'A[':E": I',10. "1 --.==='====:=--- MARKER- T RUE SUBSEA-L .................. CODE ............ MEA'.:E:UREfi VERTICAL MD-TV'n VERTICAL R E C T A N G U L A R C L 0 '.:; U R F VERI'ICAL. ......................... NAHE DEF'TH riEPTH D'[FF DEF'"rH C 0 0 R D I N A T E S rilSTANCE DTF;;ECTI'ON 1-H]'CKI",IESS ................................................ __EEEI___ FEET ., 1" 0 P W E:'S T :--;A I.::: :3.5.50.00 34'P 4.9 ....... £4A'S E .,, I,,,IE $'E_SAK '~'E'/3(') - (')(') FEET FEE_'1'; 55. I :3:3 72.90 5¢7.7 ._'E-_:74:--:. '29_ FE,ET FEET [, M ........................... 1~ 2:3 '-'5 ._.~. :---; 4.':'_"5.51 E 4.-' .... 78 '.S 87 5-/ E' 19.6,4 '._--; 48z}_,S3A_~_E ...... 4:F.:4, 76 ".:; ::i:-? .."! :L_g ................................... Eastman ' Wht'pstock A PETROLANE COMPANY I i · Su~gest~ ~ ?orm to be insertcd in each "Ac 'e" well folder to d~.eck for timely cc~pliance with ou~ regulations. · Operato~, W~ll Name and Number Reports and Materials to be received by: Required Date Received ~Rem. arks , 'Ccmpletion Report Yes '' ~__~g_~~ ~_~ ~ _. Well History Yes ~_~_~ " .~~ . · · _$~ ~ ,P~ p i '~ d-~,., .,- Core Chips '' ,/'//d/~-~- ~''--'-'--"--' ~/~.. ' ' · · Core DescriptiOn ~/~ Registered Survey Plat 7 ~ ?~/~ ~b~ ~/~. Inclination Survey /~.~ -- ~/~ , , · _.Directional Survey I~ROM: ~.. K. SMITM/P. S. BAXTER TP, AIqSMITTED REREWITH AI~E THE FOLLOWING: PLEASE lqOTE: BL - BLUE'LINE, S - SEPIA, F - FILM, T - TAPE, PC - PHOTOCOPY yACKNOWLEDGED: EASE RETUKN KECEIPT TO: ARCO ALASKA, INC. ATTlq: PATSY S. BAXTER ATO/515 P. O. BO)[ 100360 ANCHORAGE, AK 99510 SaAL~O~ SANDS I~OM: L. K. SMITH/P. S. BAXTER · TRANSHITTED HEREb~ITH ARE THE FOLLOWING: RECEIPT ACKNOIJLEDC, ED: E RETURN RECEIPT TO: Alaska Oil & Gas Cons. Commission DATE' h ..... ARCO ALASKA, INC. ATT~: PATSY S. BAXTER ATO/515 P. O. BOX 100360 ANCltOKAGE, AK 99510 ARCO Ataska, tm Post Ottice Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 September 20, 1984 Mr. C. V. Chatterton commi ss ioner State of Alaska Alaska Oil & Gas Conservation Commi ssion 3001 Porcupine Drive Anchorage, AK. 99501 SUBJECT' MonthlY state ReportS - WSP #7, WSP #9, WSP #12 Dear Mr. chatterton: ' Enclosed are the Monthly state ReportS for the subject wells ii= you should have any questions, please call me at 263-4654. c hmi dt . ~j. W.._S~ n~lling Engineer ?rojec~ ~" jwS/SH/tw GRU1/L44 Enclosures RECEIVED SEP 2 4 Alaska 0il & Gas Cons. Commission Anchorage lc ~ ~h~irli~rv O! AttartticRichlleldc°mpan¥ -. STATE OF ALASKA '~--- ' ALASKA O~L AND GAS CONSERVATION CON,,,IISSION ~ MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS';/~ · Drilling well [] Workover operation~[ ~ 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 84-~~J 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21100 4. Location of Well atsurface 1669' FSL, 2273' FEL, Sec.35, TllN, R10E, UN 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 122' RKB, Pad 82' ADL 25661 ALK 471 9. Unit or Lease Name Kuparuk River Unit 10. Well No. WSP #9 Workover 11. Field and Pool Kuparuk River Field West Sak 0il Poo] Objective For the Month of. August ,19 84 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Accept rig ~ 1630 hrs, 08/19/84. POOH, ly dn 3-1/2" tbg & pkr. RIH w/2-7/8" tbg & clan out f/3789' to 4124'. Circ hole clean. Set 7" Bot 1-B sump pkr ~ 3878'. RIH w/2-7/8" x 3.38" x 12 ga wire screen. Gravel pack assy w/BOT 7" wolverine pkr set @ 3453'. Gravel pack w/40 bbls slurry. Circ hole clean. (see attached sheet) 13. Casing or liner ru.n and quantities of cement, results of pressure tests N/A 14. Coring resume and brief description N/A 15. Logs run and depth where run N/A 6. DST data, perforating data, shows of H2S, miscellaneous data N/A RECEIVED SEP 2 4 1984 Alaska 0il & 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Anchorage SIGNED ~ TITLE Project Drlg. Engineer DATE. NOZE--Repoftlon ~his ~'orm is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. c~.~ ~n_AnA ,,,, , /,,an~. Submit in duplicate Monthly RePort of Drilling and Workover operations WSP #9 Workover (cont'd) 12. Ran gravel pack logs. RIH w/2-7/8" completion assy & jet pump cavity. Lnd tbg w/stinger in pkr ~ 3453'. Displ well to diesel. Secured well and released rig @ 1330 hfs, 08/31/84. RECEIVED SEP 2 4 Alaska Oil & Gas Cons. Commission Anchorage # DATE: ~-'/.:, ~,.0 TRANSMITTED HEREWITH ARE THE FOLLOWING: FROM: L. K. SMITH/P. S. BAXTER RECEIPT ACKNOWLEDGED: DATE:~ ..: . ~,, PLEASE RETURN RECEIPT TO: //KRCOALASKA, INC. &," ATTN: PATSY S. BAXTER ATO/515 P. O. BOX 100360 Anchorage ANCHORAGE, AK 99510 ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 July 31, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK. 99501 SUBJECT- WSP-9 Dear Mr. Chatterton- Enclosed is a Sundry Notice for the pull the 3-1/2" tubing and packer and with 2-7/8" tubing. Since we expect to start this work on earliest approval will be appreciated. questions, please call me at 263-4943. Sincerely, J. E. Onisko Senior Drilling Engineer JEO/JG/tw GRU8/L76 Enclosures subject well. We propose then complete this well August 6, 1984, your If you have any to RECEIVED JUL 3 1 A~aska Oil & Gas Cons. Commission Annhnrq. ne ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany -~--, STATE OF ALASKA ALASKA ~-.,_ AND GAS CONSERVATION CC .,vllSSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 84-47 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21100 4. Location of Well Surface: OTHER 1669' FSL, 2273' FEL, Sec.35, T11N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) RKB 122' Pad 82' 6. Lease Designation and Serial No. ADL 25661 ALK 471 9. Unit or Lease Name Kuparuk River Unit 10. Well Number WSP-9 11. Field and Pool Kuparuk River Field West Sak 0il Pool 0bjecti ye 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing ]~ Other ~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc,, proposes to: 1, Move in completion rig, 2, Remove tree, Install BOP and test to 3000 psi (annular to 1800 psi). 3, Pull '3-1/2" tubing and packer, 4. Run 2-7/8" x 3,38" gravel pack screens and gravel pack adjacent to the West Sak Sands, 5. Run 2-7/8" tubing and complete well, 6, Release rig, Estimated Start: August 6, 1984 RECEIVED JUL 3 11~ Alaska Oil & Gas Cons. Commissio Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. , ~1~,~i~ Senior Drilling Engineer The space below for Commission use Conditions of Approval, if any: Approved Copy By Order of BY I. ON~IE ~. Sllllfil COMMISSIONER the Commission Approved by Date Form 10-403 GRU8/SN21 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate AS-BUlL. F ,i-s' l-S ¥- 5,946,006.78 .15 x= 558,809.13 · 2 2194~ F.S.L. · 4 15 Y= 5,945,9z, 8.63 · 5 X= 558,823.7~ · 6 2136 F.S.L. · 7 2 y= 5,9~,5,890.73 · 8 / X= 558 837.9B e9 / [ ~] .10 2078~ F.S.L. ~J . I! 3 Y= 5,9~5,831.95 [~l . 12 X= 558,852.63 'l .]4 ~ Y-5,9~5,773.63 ]960 F.S.L. T-lIN 5~ 3e 5 Y= 5, 9~5, 715. 67 TION 2 t X= 558,881.52 I HEREBY CERTIFY THAT I AM PROPERLY 1902 F.S.L. REGISTERED AND LICENSED TO PRACTICE LAND 6 Y= 5,9~5,657.~2 SURVEYING IN THE STATE OF ALASKA~ THAT THI~ X= 558,896.09 PLAT REPRESENTS A SURVEY MADE UNDER MYDIRECT 18~ F.S.L. SUPERVISION AND THAT ALL DETAILS ARE CORRECT AS OF DEC. ~1983 7 Y= 5,9~5,59g.2~ %~~. X- 558,910.61 ~/- ~ ''~-I~ 1786 F.S.L. ~ ~ .* - *. ~ ~ 8 Y= 5 9~5 5~1 10 ~Y o® ~ Oe-~ .... :,,-- ~ * , · --.' ~'~ eo ~'~J, .. ~ ~ ' /" /~ ~ X- 558,925.20 n, ' --/'+ 6 :-/' ~ ~ ~tl~ ,~~ ,~ ' : ... 1727 F.S.L. / //:- '//.".~ ~'~ g Y- 5 9~5 482.64 ~ ,. .. '-'~-' .... X= 558,g53.70 %~. ESSlO,~,~ ~'O4 1612 F.S.L. -~~~ 11 Y- 5,9~5,366.27 NOTES: X= 558,968.6~ I. ALL Y AND X COORDINATES ARE ALASKA STATE 1552~ F.S.L. PLANE, ZONE4. 12 Y= 5,945, 308.09 ~.DISTANCE~ FROM SECTION LINES ARE GEODETIC. X- 558,983.14 1~9~~ r.S.L. 3. THIS PLAT SUPERCEDES DRAWINGS NSK.9.16.1 d.4, 13 Y= 5,945,2~9.93 d. 5 end &24-REFLECTS FINAL WELL NUMBERING. X- 558,997.55 CONDUCTORS IS,15,2- 14 LAT. 70°15'47.1132'' LONG. 1~,9°31 '28.429" 2399' F.E.L. LAT. 70°15'46.5402'' LONG.lq9° 31'28.016" 238~ F.E.L. LAT. 70°15'45.9695'' LONG. 149°31 '27.§16" 2371' F.E.L. LAT. 70o15'45.3903'' LONG. 1 ~9°31 '27.202" 2356' F.E.L. LAI. 70°15'~.8156'' LONG. 1~9°31'26. 794' 23~2' F.E.L. LAT. 70°15'4~.2445' LONG. 1~,g°31 '26. 388" 2329' F.E.L. LAT. 70° 15'/.,3. 670G'' LONG. 1/-,9°31 '25. 978" 2315' F.E.L. LAT. 70°15'43.0971'' LONG.I4g°31 25.568" 2301~ F.E.L. LAT. 70o15'42.5242'' LONG.149°31 25.157" 2287 F.E.L. LAT. 70°15'/+1.9/+80'' LONG.149° 31 2~. 750" 2273' F.E.L. LAT. 70° 15'A1.3905" LONG.I~9°31 24. 353" 2259' F.E.L. LAT. 70° 15'40.8012'' LONG.1Gg°31 23. 933" 2245' F.E.L. LAT. 70°15'~,0.2279'' LONG.149°31 23.524" 2231' F.E.L. LAT. 70°15'39.6547'' LONG.14g° 31 '23.117" 2217' F.E.L. 1~36' F.S.L. LOCATED IN PROTRACTED SEC. 35,TIIN,RIOE UMIAT MERIDIAN 14 Y= 5,945,191.67 LAT. 7~°15'39.0806''u ~::~ ~ ~'~J ~ k") I'":' ~"LE J1377'X= 559,O12.10F.S.L. 2203'LONG' 1/~9° 31' 22' 708"F.E.L. i ~_~ 4. Rev. 1, Section line distances Conductor 1-S ,co WESTSAK PILOT PROJECT i~!. jJ~ WEST SAK PILOT DRILL SITE 34 AS-BUILT CONDUCTOR LOCATIONS 8SSGG Do,e: 6/15/84 Scale: NO SCALE .............. Oraftsperson: LSN Drawing No. 9.16 d · ARCO Alaska, I, Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 June 21, 1984 Mrs. Elaine Johnson State of Alaska Alaska Oil & Gas Conservation Commission 2001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Conductor As-Built Location Plat - WSP Wells lS, 15, 2-14 Dear Elaine. Enclosed is an as-built location plat for the subject wells. you have any questions, please call me at 263-4944. Sincerely, · ~/J. Gruber Associate Engineer JG/tw GRU8/L08 Enclosure If ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany "!-$ .6 · 10 .11 ol2 · 13 · 14 TION 2 '1 I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF' ALASKA, THAT THIS PLAT REPRESENTS A SURVEY MADE UNDER MY DIRECT SUPERVISION AND THAT ALL DETAILS ARE CORRECT AS'E ~ CONDUCTORS IS, 15,2-14 l-S Y- 5,9~6,005.78 X- 558,809.13 2329' F.S.L. 15 Y- 5,%5,9~8.63 X- 558,823.7~ 2~36 F.S.L. 2 ¥, 5,945,890.73 X. 558,837.96 2078~ F.S.L. 3 Y- 5,9~5,831.95 X- 558,852.63 2019' F.$.L. Y- 5,9~5,773.63 X- 558,867.14 1960 F.S.L. 5 Y- 5,945,715.67 X- 558,881.52 1902~ F.S.L. 6 Y- 5,9~5,657.42 X= 558,896.09 1844t F.S.L. AS OF DEC. ;~_,1985 7 Y- 5,945,599.24 · ~-~"~,'%'~ '~ ~, - ' X - 558,9 ] 0.61 1786~ F S L I I: '" ~_~ .. ~.~~ .~ / ~ 8 5,9~5,5~] . ~0 I ~,' -~'~ '~ · ~- '~ ~ '~ 558 925.20 -'~ ~: ~'"' ~:~, X= 558 939.63 ?~1~1 X- 558,953.70 ~O~ssfo~c ~J ~% ] 6 ~ 2' F . s. L. NOTES: ~ ]1 !. ALL Y ANDX COORDINATES ARE ALASKA STATE PLANE~ ZONE4. 2. DISTANCES FROM SECTION LINES ARE GEODETIC. 3. THIS PLAT SUPERCEDES DRAWINGS NSK.9.16.1 d. 5 end d.~4-REFLECTS FINAL WELL NUMBERING. LOCATED IN PROTRACTED SEC. 35 TIIN,RIOE UMIAT MERIDIAN 12 Y- 5,945,365.27 X= 558,968.64 1552t F.S.L. ¥= 5,945,308.09 X= 558,983.14 1494~ F.S.L. 13 ¥= 5,945,249.93 X= 55B,997.55 1435~ F.S.L. 14 Y= 5,945,191.67 559,012.10 LAT. 70°15'~7.113Z" LONG.l&9°31'28.429" 219~~ F.E.L. LAT. 7~5~46.5~02" LDNG.[4~ 238G F.E.L. LAT. 70°15'A5.9695'' LONG.l&9°31'27.616" 2371' F.E.L. LAT. 70°15~&5.3903" LDNG.]~g°31'27.202, 2356' F.E.L. LAT. 70°15'44.8156' LONG.]~g°31'26.7g&" 23&2' F~E.L. LAT. 70°15'6q.2445. LONG.I4g°31,26.3BB. 2329~ F.E.L. LAT. 70°15'43.§70~. LONG.149°31,25.978,, 2315' F.E.L. LAT. 70°15~43.0971" LONG.149°3]~25.5§8' 2301~ F.E.L. LAT. 70°15'42.5242" LONG.149°31~25.157" 2287 F.E.L. LAT. 70°15'~1.g~80" LONG.149o31~2~.750" 2273' F.E.L. LAT. 70°~5'~1.3905" LONG.149°31~24.353~ 2259~ F.E.L. LAT. 70°15~60.8012~ LONG.]4~ 31'23.933" 22&5~ F.E.L. LA). ?~15'~0.2279" LONG.Iq~ 31'23.52~" 2231~ F.E.L. LAl. 7~15'39.6547" LONG.lq~ 31'23.117" 2217' F.E.L. LAT. 7~15'39.080§" ~ X= LONG. 1~,9° 31 ' 22. 708" 1377~ F.S.L. 2203~ F.E.L. . / ' ~ ARCO Alaska,Inc. ~ ' ~ ~-' ~ '~-~-~' '~ WEST SAK PILOT PROJECT AS-BUILT CONDUCTOR LOCATIONS ........... D~p~m: L~ Drowing Nc~ 9.16 d $4 .-. STATE OF ALASKA ALASKA,' '-AND GAS CONSERVATION CC ~¢IISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drilling well [] Workover operation~ o, o ..r.tor ARCO Alaska, Inc. - 3. Address 8. APl Nl~e_r21100 P. O. Box 100360, Anchorage, AK 99510 50- 9. Unit or Lease Name 1669' FSL,2273' FEL, Sec.35, TllN, R10E, UM Kuparuk River Unit 4. Location of Well at surface !5. Elevation in feet (indicate KB, DF, etc.) PAD 82' 122' RKB , 6. Lease Designation and Serial No. ADL 25661 ALK 471 10. Well No wsPCf9 11. Field and Pool KPK River Field West Sak Oil Pool Obj For the Month of April 84 19 , -- .12. Depth at end of month, footage drilled, fishi~ job~ directional drilling, problems, spud date, remarks 3½" ' Accept rig @ 1500 hrs on 4/15/84. RIH w/Baker FHL Packer and tbg. Set packer' @ 3438'. Displ tbg w/diesel, dropped ball and set pkr tstd pkr. Secured well and released rig @ 1200 hfs on 4/16/84. 13. Casing or liner run and quantities of cement, results of pressure tests N/A 14. Coring resume and brief description N/A 15. Logs run and depth where run ~/A 6. DST data, perforatin9 data, shows of HzS, miscellaneous data ! 8 ]984 - --"' ,~,~, 17. I hereby certify that the foregoing is true and correct to the best of my knowledge· ' Anchorage ~~ ~Y-~-~' TITLE Area Drillin~ Engineer OATE :SIGNED NOTE--Repo/ong~/~ is required for each calendar month, regardless of the status of operations, and must be-~d~doP~icate with the Alaska Oil and Ga~onserva~ Commission by the 15th of the succeeding month, unless otherwise directed. Form 10~04 ~[~g/~145 Submit in duplicate SHALLOW SANDS ENGINEERING TRANSMITTAL #_ ~)! I~) TO: DATE: FROM: L.K. Smith/ P. S. Baxter TRANSHITTED HEREWITH ARE THE FOLLOWING: .PLEASE NOTE: (~- BLUELINE,~_2~- SEPIA, F - FILM, T - TAPE, PC - PHOTOCOPY RECEIPT ACKNOWLEDGED: ~ , ~.,~'~'O'' F (''' D.~T~'_EIVED 6N/la TO , ~'~ ~ ATTN: PATSY S. B~XTER . ' ~ ~s Con~~sSiO P. O. BOX 100360 Anchorage ANCHO~Gg, A~ 99510 SHALLOW SANDS ENGINEERING U:maWS~ITTAn # ~!1 ~ TO: DATE: FROM: L.K. ~gnith/ P. S. Baxter WELL NAME: i~'~' ~ {~_~ ¥ TRANSMITTED HEREWITH ARE THE FOLLOWING: PLEASE NOTE: BL - BLUELINE, S - SEPIA, F - FILM, T - TAPE, PC - PHOTOCOPY pRLCEIPT ACKNOWLEDGED: EASE RETURN RECEIPT TO: ARCO ALASKA, INC. ATTN: PATSY S. B~XTER P. O. BOX 100360 ANCHORAGE, AK 99510 ATO/515 ' .~.,~lCO A!-aska, Inr~''''~' Post Office vox 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 April 15, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Enclosed are the Monthly State Reports for the following wells: 2B-9 2F-7 WSP #3 2B-10 2F-8 WSP #9 2B-11 2F-9 WSP #12 2B-12 2F-10 Hemi Springs State #1 2A-1 ~TSP #1S Thank you. Sincerely, / Agti~District Drilling Engineer JBK/SHi:ih ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ~ . ° -ALASK/:~'-''' ]LAND GAS CONSERVATION C 1MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS / 1. Drilling well ~ Workover operation [] 7. Permit No. 2' N a n~el~ ~ P e~a~s k a, Inc. 84-47 'AdS?s0 00 60 9¢SZ0 ' ~ ~ 50-- 9. Unit or Lease Name 1669' FSL,2273' FEL, Sec.35, TllN, R10E, UM Kuparuk River Unit 4. Location of Well at surface 5. Elevation in feet (indicate F, I ADL 25661 ALK 471 :BAD 82 ', 122 ' KI~ etc.) 6. Lease Designation and Serial No. 10. Well No. WSP-9 11. Field and Pool KPK River Field West Sak Oil Pool Obj. March 84 For the Month of. , 19__ :12. Depth at end of month, foot~e drilled, fishing jgb~ Qirectional drilling problems, spud date, remarks Spudded well @ 2015 hrs, 03/26/84. Drld 12¼" hole to 3395'. Ran, cmtd & tstd 9-5'/8" csg. Drlg 8½" hole to 4100. Ran logs. Cont drlg. 8½" hole to 4225'TD. Ran, cmt and tstd 7" csg. Secured well and released well @ 1600 hfs on 4/1/84. 13. Casing or liner run and quantities of cement, results of pressure tests 9-5/8" 36~f J-55 HFERW BTC csg w/shoe @ 3380. class "G". 7" 23f~ S-95 BTC csg w/shoe @ 4212'. Cmtd w/1350 sxs Cold Set III and 250 sxs Cmtd w/190 sxs class "G".' 14. Coring resume and brief description N/A 15. Logs run and depth where run DTL/FDC/Cl~/GR f/4098' to 3380'. .16. DST data, perforating data, shows of H2S, miscellaneous data 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SIGNED TITLE Area Drillinm Enmineer DATE NOTE--R~s/o~m is required for each calendar month, regardless of the status of operations, and must b ' ' d in duplicate with the Alaska Oil and G~mmission by the 15th of the succeeding month, unless otherwise directed. Form 10404 HILL/MR130 Submit in duplicate West Sak Pilot #9 DRILLING HISTORY NU 20" hydril & diverter and tstd same. Spudded well @ 2015 hrs, 03/26/84. Drld 12-1/4" hole to 3395'. Ran 85 jts 9-5/8" 36# J-55 HFERW BTC csg w/shoe @ 3380. Cmtd 9-5/8" csg w/1350 sxs of Cold Set III & 250 sxs class "G". Bumped plug w/1500 psi . Floats held - ok. ND 20" Hydril & diverter. Installed 9-5/8" packoff and tstd to 3000 psi - ok. NU BOPE and tstd to 3000 psi - ok. Tstd csg to 1500 psi - ok. Drlg. FC & cmt. Drld FS & 10' new form. Tstd form to 13.5 ppg-EMW - ok. Drlg 8½" hole to 4100'. Ran logs DIL/FDC/CNL/GR f 4098' to 3380'. Cent drlg 8½" holes 4225'TD as of 3/31/84. Ran 95 jts 7" 23# S-95 BTC-csg w/shoe @ 4212'. Cmtd 7" csg w/190 sxs class "G". Bumped plug w/2500 psi - ok. NU BOPE. Installed 7" packoff and tstd to 2500 psi - ok. NU tree. Secured well and released rig @ 1600 4/1/84. APR 1 9 )_984 DI-I124 Alaska 0il & Gas Oons. t;ummissio. 4 / 16 / 84 Anchorage ih ARCO Alaska, Ir?'''' ~ Post Offic= =ox 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 16, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' WSP-9 Dear Mr. Chatterton' Enclosed is a Sundry Notice for the subject well. We propose to run a "frac string" and stimulate this well. Since we expect to start this work on April 15, 1984, your earliest approval will be appreciated. Verbal approval for this work was received from J. Trimble, AOGCC, on April 13, 1984. If you have any questions, please call me at 263-4943. Sincerely, J. E. Onisko Senior Drilling Engineer JEO/GRU6L98- rb Enclosures RE[E VED A¥ it 1 61'3 4 0il & Gas Gens. ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ~-, STATE OF ALASKA ..... ALASK' .')IL AND GAS CONSERVATION L ,VlMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 84-47 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21100 OTHER 4. Location of Well 1669' FSL, 2273' FEL, Sec.35, T11N, R10E, UH 5. Elevation in feet (indicate KB, DF, etc.) 122' RKB, Pad 82' I 6. Lease Designation and Serial No. ADL 25661 ALK 471 12. 9. Unit or Lease Name Kuparuk River Unit 10. Well Number WSP-9 11. Field and Pool Kuparuk River Field West Sak Oil Pool Objective Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate ~ Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other ~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a sub. mitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Note: Verbal approval for these operations was received from Mr. J. Trimble, AOGCC, on April 13, 1984. ARCO Alaska, Inc. proposes to: 1. Remove tree and install BOP stack. Test for AOGCC witness. 2. Run a "frac string" consisting of 3-1/2" tubing and a packer. Remove BOP stack and install tree. 4. Release rig. 5. Fracture the West Sak Sands. 6. Completion operations to be conducted under separate Sundry Notice. Estimated Start: April 15, 1984 RECEIVED APi'I 1 6 1984 ,; ~,.-.': ;4;. Oil 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. The space below for Commission use Title Sr. Drilling Engineer Conditions of APproval, if any: Approved by )RIG!iIAt Siil[ll BY lOH~lE ~. S)ITI~ COMMISSIONER Approved Copy / / By Order of the Comm~,,~o. Submit "ln¢enfions" in Tr~licate 9 Form 10-403 Rev..7-1-80 GRU6/SN48 and "Subsequent Reports" in Duplicate ~arch ~3, 198~ Mr. Jim E. Onisko Senior Drilling Engineer ARCO Alaska, Inc. P. O. Box 100360 A~nehorage, Alaska 995!0 .. Re: Kuparuk River Unit WSP-9 .f A~RCO Alaska, Inc. / Permit No. 84-47 ~-/ B~hole Loc. 1667''~~, 1731 , See. 35, TllN, RI0E, ~. Dear Mr. ~isko: Enclosed is the approved application for permit to drill the above referenced well. If coring is conducted, a one cubic inch chip from each foot of recovered core is required. Samples of well cuttings and a mud log are not required. A continuous directional ~urvey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dlpmeter surveys. Many rivers in Alaska and their drainage systems have been classified as ~.mportant for the ~pawning or migration of anadrom~us fish Operations in the~e areas ara sub, eot to AS I6.05.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Coda). Prior to commencing operations you ~y be contacted by the ]!abitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS ~6, Chapter 3, Article 7 and the regulations promulgated thereunder (~mt~ 18, Alaska Admin~stratlve Code,. ChaDter 70) mad by the Federal Water Pollution Control Act, as amended. Prior to co, eating operations you may be contacted by a representative of the Department of Environmental Conservation. To aid us in scheduling~field work, please notify thim office ?~ hour~ prior to commencing installation of the bt. owout prevention i~. Jim E. Onisko equip~nt so that a representative of the Co~m~ssion may be be,.or~_ the surface pre~ + to witness testing of the equipment ca~g shoe is d~!~ !~re a diverter ~v~*~ is required, please also ~~- th~$ o~!~e 24 hou~ prior to ~m,~a~=~.~_.~ so that the Ce~iss~on ~ilng below the shoe n~ tn_ conductor p~pe. In the ~vent of suspension or ~b=ndo:_men,., p.~ease give rh~s o~f~ee adequate advance ~o-~4"~-~on so that we may have a witnes~ pre~e~t ~ · 2.~ ~ /'/"- / /: /.:? -- .. / C. V. ~atterton ~sk~ Oil and Gas ~C Department of Fisl~ & Game, Habitat Sect~on w/o encl. r~.~-m,~,- :~ Environmental Cons~'''~n w/o ~nct ARCO Alaska, Inc. " " Post Office Bo.. 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 March 23, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Kuparuk WSP-9 Dear Mr. Chatterton- Enclosed are' o An application for Permit to Drill Kuparuk WSP-9, along with a $100 application fee o Diagrams showing the proposed horizontal and vertical projections of the wellbore o A proximity plat o A diagram and description of the surface hole diverter system o A diagram and description of the BOP equipment Since we estimate spudding this well on March 27, 1984, your earliest approval would be appreciated. If you have any questions, please call Kevin Grimes at 263-4962. Sincerely, d. E. On~sko Senior Drilling Engineer JBK/JG6L49' tw RECEIVED MAR 2 1984 Alaska 0ii & Gas Cons. C0mm~ Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ?". ALASKA O,- AND GAS CONSERVATION COI~,,vllSSION PERMIT TO DRILL 20 AAC 25.O05 la. Type of work. DRILL I~( REDRILL [] DEEPEN [] lb. Type of well EXPLORATORY r~x DEVELOPMENT OIL [] DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC [] SINGLE ZONE E~X MULTIPLE ZONE [] 2. Name of operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360, Anchorage, Alaska 99510 9. Unit or lease name ,~.'~ ~ ' ~ 4. Location of well at surface 1669' FSL, 2273' FEL, Sec.35, T11N, R10E, UN At top of proposed producing interval 1667' FSL, 1854' FEL, 5ec.35, T11N, RIOE, UM At total depth 1667' FSL, 1731' FEL, Sec.35, T11N, RIOE, UM 5. Elevation in feet (indicate KB, DF etc.) RKB 122', Pad 82' 6. Lease designation and serial no. ADL 25661 ALK 471 10. Well number WSP-9 11. Field and pool Kuparuk River Field West Sak 0il Pool 0bjec~j~ve 12. Bond information (see 20AAC25.025) Federal Insurance Company .Type Statewide Surety and/or number #8088-26-27 Amount $500,000 13. Distance and direction from nearest town 14. Distance to nearest property or lease line ~ 15. Distance to nearest drilling or completed 30 mi. NW of Deadhorse miles 1667 feet ~ ~SP-8.~well 60' @ surface feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease / 18. Approximate spud date 4031' MD, 3962'TVD feet 2560 / 03/27/84 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures 1525 psig@ RO°F Surface KICKOFF POINT 1700 feet. MAXIMUM HOLE ANGLE 15 oI (see 20AAC25.035 (c) (2) 1525 _psig@ ~RG? ft. TD (TVD) 21 Proposed Casing, Liner and Cementing Program r SIZE SETTING DEPTH QUANTITY OF CEMENT Hole Casing 16" 9-5/8" Weight 65.5# 36.0# B-1/2" 7" 23.0# ~re-Packed Screer 5.64" x 22. Describe proposed program: CASING AND LINER Grade Coupling H-40 ~ Weld J - 5.5"/~//~4} BTC I' S-95 ! BTC 2-3/8" ! 6.4# Length MD TOP TVD 80 40' I 40' 3332 38' I 38' I 3995' 340' I 36' I 36' 3541 ' 13488' I MD BOTTOM TVD 120'1 120' 1 3370~13324' 4031'13962' 3881' 3817' (include stage data) ±200 CF 1250 sx AS III & 250 sx Class G 200 sx Class G ARCO Alaska, Inc., proposes to drill WSP-9 as a planned producer in the West Sak Pilot Project. This project will be conducted in accordance with the terms of Conservation Order No. 191, "West Sak Sands Section 35 Project". A diverter system will be used to drill the 12-1/4" hole to 4031'MD (3962'TVD). In all subsequent operations, an RSRRA BOP stack will be used and tested to 3000 psi (annular 1800 psi). WSP-8~ & WSP-IO are 60' away at surface. There are no closer wellbores anywhere downhole. A fracture treatment will be made on the West Sak Sands. A 5.64" OD x 2-3/8", 6.4#, dual wire wrapped pre-packed screen will be placed in the 7" casing. The well will be completed with 2-7/8" tubing. 23. I hereby certify that the foregoi, ng is true and correct to the best of my knowledge SIGNED ~~/~ ~~~ TITLE Sr. Drilling Engineer The space below for ~f~rnmission use ' ~-~ CONDITIONS OF APPROVAL Samples required I--lYES ~NlO Permit number APPROVED BY Form 10-401 r~_.. -~ ~ ~ EW2/PD02/ Mud log required I Directional Survey required I APl number []YES [~NO I '~_YES I-1NO I 50- .¢,~2~?-A. 1 I ~/0 Approval date -:':.7~-:~:;._, 0'4-/:'~)-q/"/'-'-'-~.~7. I SEE COVER LETTER FOR OTHER REQUIREMENTS ~~~ ,COMMISSIONER DATE March 23,~1984 _ ~'~ by order of the Commission Submit in triplicate : j_,',_," ~ j_ :__Li i ! ! ! i i i , :~_1 -.~-.~ I IL! i ; ...... '-"-' ~"" ~ ~ ' : '/~ = L ~"4,..,! ! I i i I 1 :,. ,-.,,-"".,, '., ,-.,-'-" ,, ,-:', ilii .-,-.~.--:-~-,,----t , ~--+-,---~..~*-~-*- ,--',-~ ~ , ,-',--bt,----r.-~,,--q' i-i--t-, -,-r-~ '"i-,-H,,~-i ~'. , .......... ,'-'!, ,I, ,,,, ,!ii' ;~!l, ,,i, ,' ;,, 'i '" ~ i' : , ~ II ~I~ I · ' ~ ~ ' ' '' ; i ;, ~ ,- ' · I ' ' !~ , ~ ' , ', ~ ; iii I iii 1 ; ]I1! I 11 ' ' I I i i i i / I !-t i'" :., i , " i, ..... ~ I' ' ~, I' ' ' ~ ~I ~ t? ;~I ~ ~'' ~ ~ I I ~! i iii ~, Ii~' I ilj ] i 1 i iiI. "~--'"t ' i ' " i i i ' ' i i ~ ~ ~ i ] i I I i l · ' i ,' I ..... I. iiii Jlli fill t : ~I Iii ~ : -.,, I , , , ' ' i ! , , ~1 I, , , il I ~11i !Ill iili. III . "~, I J .,'t-"ii . ~ ~IIR!;AI~Fi i~i I Ii! I ~ [ ~ ~' i ill ill I '"' ' ..i~ ~; i , ~ ,11 ,,..j . I, I i i i1!i iii ', ........ ,, I i 1 ! ..', I J i ~ l · ~ , ..... I , ' ,!~ i-Ti' .... , , , ......... ; - ' ~ ' i ..... , ', , , I i I ,',~ I i --.. ~ ~ ; ~ i i I i I . i I t ~ . , .... [! . , , iii !lii. IIII i;ii jill J ii ~i , ~ 1 Iii i i~11 ,, : ,'- 1 , t .... .~ , ! , ! I ~ , ,. I ~ I ! , . , . , ~ , ~ ....... J ~., ,1, j i I 11 l! Ji i I I! il Ii I ~ll J 'i i i l'lL ~ , , , ~ ~ ~ J , , i I , I, , , ,' , , I , i ~ I i ! I ~ ! i I I ! I I I i i ! I I i i i i j . , , i I . i ~ i I I' -,, - ., ,, ,, , , ,., , ,,i, , -r-iii i i'~i't!!I~L.L llil ' ~ lji~:~f.~ l~i~ '~ ~ l~ i ~i ~ i' i I ! I t ; t ; ! i.- · , , , . . -~'+'-~- ~ ~ ' ' -, ' ! ~. '" : ill [ ~1!! i ij ifil Iii : ~ ! .~ i ~ i ~ ~ .~'"'~ , , , , , , ~ .. ~ , , , ! ~ , , i .". I ~ i , i ', '. , ~ i , I ; , ~ i~- ~-ii .- ~, ~!i i!i; ,Iii jill i!11 i j [~i~ ,~ iiI , ii!i ~., . i,, ' ' ' '' '' 'i ~ , i ,iii il,' i11 'i i iii ',,, ' ...... i' j,,li' i .... ~ !Ill i!ii Jl l~il ill! 'I' Iiti ; it ,Iii ii =. '. i~ ilJi ilii ~ j! ili 1!.~i iiI~ '~ J ! II i' '~ ~i I~il II ~iJ Ii I '!I LLL, ,,,,', , ,,,, ,, ,,,, i' iii !~ii I !iii i~. ~ii ii i il!l i t I , i ii'tl ,,! , , ' , ' . i ! i ' .. , ii i iii, i i I i i i ~l I I I i i I, i , 11 I , I I I I i I I · :~J~ ;iij i J ~ii ~4 Ii i i!ii ~11i i~11 ii~i I11i ~lil 1'I ill,r I ~ ,I I 1 !' i'J iii i!II i~,, , ' ........ 4.'t~,i,;._,__,_.,_ ii ~ili ~.' !i i;1~' ilij iiit III~ .....~lil I~il ' I~ illl. t I ili~, I I I1 I 1 -., i j , ,---'+~,~ i i I i i , ~ ! i ! L i i I i ~ i I I i ! i I i ! i I i i ! I [ I I I i i i I ! I i ! J i 11 1 ']~..,[ ~ i i i I ! i i ! I i J I ! i i ! I ! I I I I I ! I ~ i I i I i I 11 l i ! ij i ' ': ~.-,,~, J ; i I i i I i iT-il ii -i i i i ~ I ~ ..LI i ~ I I I '. i I i · , , , ' ~ . _,_L..-'., : i . i I i ~ ~ i i ~ i i ~.l._i.,.i~ ~ ~ ._.i Ij I i_ I~" : !.I_ L .- I , I I i I I i II! i~--,,-,ll iili i l~.i~ ! iI:.'ViU~. 1 / LJiLIII "lUll! / l'liJ]. . l',{b~U ' ! I I '1 ii 1 ~ ~ J i I i i i I J I -.~ i I I I I. -lllllli fi I_-4 !1~!~-~1! i I I I I I ~ E '.~ll'l, ·~ I i l J~ i~ jI i ll~ Li i~I I ii 'fi i ......... J I il I l ;,.~i i -i [ii Il i~l ilii i ill il i l!l i!. i l~ll I I I ,v,~ ,~ .~ i..-" ll~/,l i i I 1 ~:jjj i".~l! Jill ,iL fill Jill jj. lilljj IIll !ill I i' I , ~]L I i i , , i~lj liJl '~!~l'~ LL!i !:]1L,~_ !i!~ lllJJ 'ii! 1 J .1. I~'L: i..li I ~ I ir4~, i. i I I ! i\I-J i i ! i ' i J-i 'I -! i i i ",i i ~, i i ~ ;, ' ,i.~ i ,~ ~ ,~ ~{, ' ~, ' ~,~,.h.J,,-.,,, ..... i~ i ~i I I i ' _i'"-i'"i'T~' i i ! II I '" "i! "'" '"' 'il; '"'- i '" -,,,, ,~ ' '.. illi ~l'i I f iii! I~i, I I iii 1 I II I II i I ! F,.~i ! ! i ~ i i t ! ~ i I I i i ~ , ' I ' ' I I i t I i i I I i I I I ' ~ ~ ' ~ , i : i · i · I ~ ~ , J i ~ , , : , - ~-I I '. i i i i\i i i I I ii ! I j 'i"~. I .."'"'"""~ , "~ ,{~ .... ~ I ~ I I i i i i [ i r ~ -'--'~ I : ~ .... ~ ! ii i , '~ , ,i i,~,: , , j ,I'1,~ ";i!,,,,~, ,~./I!~I 1', .... ii,,~i,~ i' '~ ~- i '. '-:'~ ,,;-ii!:: !illjl r lli' i,, i!,,,, ,,,II , , ~,~l ,., ~ liii ill iii', i ! i il'i ii i.ii i 'i',,,, · ~ ii~L i, ~'ii iii i .lli~. Iiii ~ill l~ ' '' ~ ..... '~'~' . , I I j ', ! ! .-'- ~ ~ i ~ t i . I ii! i I . .... ; ~ i i i i ~ I I ! ,il I ! i ~ ~ i ; i i i i i ~ i i ; i i i Tr/'~ liDt '-+~ i!i! ~;n~ni !iTT-\iiii !, , , ~;~ ~, ~, ~ :ii,, ~;,~ i i i ...... ' ,~ ii ii i i i ',tlil iili i~ !!!i. l!li ii-'--! ,I,, ,,..~ !iii li;l ll'i ' ]' i i i ! i ~ i~! ! i TIFII~, il ~ II~NIII i fvrl~lS-gl fl,,,lrlJ]t!l~'J~ I I i .,, I I , - --.-, ,- .... ~--,- I ' ! I ! I i ! ! -r'-~-- f ' I- """-j .--- - ,'""i~1 r' · _~ i i i ii i i ~ ! i'I i I i~1 ! i ~ , J , 1 ~1 : ~ ' ' .' i .... ' .'7! i-[ '71 'TT- i iTi I !; I ! j ! i i ~ ~ ! i i I i i ! i i iIi ! ' ' J~ , , . ,:' , , , , J I I i i t I t. ! ! ~ ~ I I I I i I I ! I I I i I i ] ! i . 1 i I i I, ! I. ~ ! i i i i J : L i i i i I ~i ! iai i=~,al i,,.,,!~!,,,,,i :oi"ri' ] 'r'i~i'~L.~:~! .,,rdi'~.,i-.'~"~',~i n~-j)~_-~-~ i I ! ,i ':'' ' , ! , I ~,, .. '_L~J ~ ~..~ ,,..,,,,. ,,.,,, ',,,,,,,.,,,,,~ ] ;,;.: ,i,,..,,-~..,~'! i, ,,.,,r'~',-, ',-'I ~'~.' T¥",¥ !l il ~! Il ~,, : i ! ' I ~,~ i Jil i[i',i ii{i {!iTA ~ 'q' 'ii-T-'_.' i--l'-i--li{'i'-i FFF;i i'i.~ i'-~ i-? T%'!..iJ'rTI I l~li !ill ill !~,{ :i. ;, : i;{ !,Ii ~{{! ill! jill !lli/ '.J' I · :l I I I . { I ' , ,,,,,'~ ,.-,,~ '"-, ,i'"' I "'"'""'~ ~',~T"'."- i .'t , ! ,'T",'!' i'"'~i ,~.'""I i I '""~'i I i i ! ~ i : ; i ~ i-"! i i i i i~i'l' : I ~ , .. ,'ff.: ~ ; i ~ ~ ,., ! ~ , , , i ..... ' '' '~ :i ii'i: i { '::=ii l!i ~ ~ ! I ~ j L: i i i i "i ." i t !il ~ ~ . : ~ ' ~ : i ; .. i -!"-.( --~ i J ~ ' I , ,, ; ! I i ' . , ; i , , i ! i i ii! Surface Diverter Syst..em 1. 16"-2000 psi Tankco starting head. 2. Tankco quick connect assy. 1G" X 20" 2000 psi double studded adapter. 4. 20" 2000 psi drilling spool w/lO" si de outlets. 5. 10" ball valves, hydraulically actuated, w/lO" lines to reserve pit. Valves to open automatically upon closure of annular preventer. 6. 20" 2000 psi annular preventer. 7. 20" bell nipple. RECEIVED MAR 2 .$1984 Alaska 0il & Gas Cons. Commission1 Anchorage Maintenance & Operation 1. Upon initial installation close annular preventer and verify ~hat ball valves have opened properly. 2. Close annular preventer and blow air through diverter lines every 12 hours. 3. Close annular preventer in the event that gas or fluid flow to surface is detected. If necessary, manually override and close ball valve to upwind diverter line. Do not shut in well u~der any circumstances. 16" Conductor PR£¥ENI'ER PIPS8 ~J%M~ ~ DIAGRAM ~1 !3-5/8" 5000 PSI RSRRA BOP STACK 1. 16" - 2000 psi Tankco szar~ing head 2. 11" - 3000 psi'casing head 3. 11" - 3000 psi x 13-5/8" - 5000 psi spacer spool 4. 13-5/8" - 5000 psi x 13-5/8" - 5000 psi drilling spool 5. 13-5/8" - 5000 psi pipe rmms 6. 13-5/8" - 5000 psi drilling spool w/choke and kill lines 7. 13-5/8" - 5000 psi pipe rams 8. 15-$/B' - $000 psi blind rams 9. 13-5/B" -.5000 psi annular BLIND ACCUMULATOR CAPACITY TEST 1.CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2.ASSURE THAT ACCUMULATOR PRESSURE ES 3000 PSI WIT1q 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON NADC REPORT. THE ACCEPTABLE LOWER LIMI? IS 45 SECONDS CLOSING TIME AND i200 PSI REKAINING PRESSURE. 13-5/8" BOP STACK TEST 1. FtLL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. 2. CHECK THAT ALL HOLD DOWN SCREWS ARE FULLY RE'FRACTo kD. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SF. AT IN WELL,HF.~d). RUN IN LOCK DOWN-SCREWS IN HEAD. 3. CLOSE ANNULAR PREYENTER AND Vj~J~'V]~S UP~'OF ~I<]~S. ZX]N-~T THST ACvtIN~ CI. DS~ CI-DKHS 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD'FOR 10 MINUTES. 5. INCREASE PRESSURE TO 1800 PSI AND HOLE FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCRESkSE PRESSURE TO 3000 PSI AND HOLD FOR i0 ~. ~'Pt~I~SS~ DOWIN~ OF CI-IOI{B ISOIATION V.A/~.lyI~S. TO ZERO PSI TO TEST VALVES, TEST REJvU~INING UNTESTED MANIFOLD.VALVES, IF ANY, WITH 3000 PSi UPSTRF.~qJ~I OF VALVE AND ZERO PSI DOWNSTRF. JaJ~. BLEED SYSTEM TO ZERO PSI. 9.OPEN TOP SET OF PIPE RAMS AND CLOSE BOTTOM SaT OF PIPE RAMS. lO. INCRF..A.SE-PRESSURE TO 3000 PSI AND HOLD FOR 10 MINUTES BLEED TO ZERO PSi. 11. -OPEN BOt-FOM SET OF PIPE RAMS. BACK OFF RUNNING jOINT AND PULL OUT OF HOLE. CLOSE BLIND PAMS AND TEST TO 3000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 12. OPEN BLIND RAMS AND RECOVER TEST PLUG, MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SaT IN DRILLING POSITION. 13. TEST STANDPIPE VALVES TO 3000 PSi. 14. TEST KELLY COCICS AND INSIDE BOP TO 3000 PSi WITH KOOME¥ PUMP. 1S. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM SIGN AND SEND TO DRILL!NG SUPERVISOR. I6. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNC- TIONALLY OPERATE BOPE DAILY. MAR 23 !~!~4 CHECK LIST FOR NEW WELL PERMITS Company ~?i5 ~'~'~' ~"'~ Lease & Well No. ITEM APPROVE DATE (1) Fee (2) Loc (8). (3) Admin .(?,,~,x,,,--. .i].,~."~:7~'"& (9 thru 11) (10 and 11) (4) Casg ,ff~/~ ~-~7-ff (12 thru 20) (21 thru 24) (6) Add: · me 3. 4. 5. 6. 7. 8. 1 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. YES NO Is the permit fee attached .......................................... ,I Is well to be located in a defined pool ............................. . Is well located proper distance from property line ....................... Is well located proper distance from other wells .................... i!" ';'~ Is sufficient undedicated acreage available in this pool .............. Is well to be deviated, and is well bore plat included ............... :~',., '" Is operator the only affected party ................................. ~-,~ .... Can permit be approved before ten-day wait . ....... · eeeeeeeeeeeeeeee,eeeeeeee r ... · Does operator have a bond in force ................. 'y""~, Is a conservation order needed ........... ~ Is administrative approval needed ................................... ~,,~ ...... Is conductor string provided ........................................ Is enough cement used to circulate on conductor and surface .... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will surface casing protect fresh water zones ....... ~ ,. Will all casing give adequate safety in collapse, tension and burst.. '~ff~ Is this well to be kicked off from an existing wellbore ............. .... Is old wellbore abandonment procedure included on 10-403 ............ Is adequate well bore separation proposed ........................... Is a diverter system required ....................................... Are necessary diagrams of diverter and BOP equipment attached ....... Does BOPE have sufficient pressure rating - Test to ~F~'D-Z) psig .. Does the choke manifold comply w/API RP-53 (Feb.78) .................. Additional requirements Additional Remarks: J~ p- REMARKS 0 Geology: Engige~ring JAL ~.~-~'MTM rev: 12/08/83 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effod has been made to chronologically organize this category of information. ~v 01, n.~()~ VE~IF.[mA~InN LTS~ING PACE ! * T~PF gEnDeR E~V?C~ NA~E :FD~T ~?E :~4/04t g RTGTN ~00~0 APE N~MF lm0~7 O~TTNIIATI~N # RFVTOU$ T~P~ ********** EOF I[,E N~MF :mD~? E~VTC~ NA~E E~S?O. ~ :A~E : AXI~LI~ [~ENG?H : 1024 RE,VTOUS FT[,R : ~O~TRN?S IN ~ ~RCO AY, ASK~ rN ! WEST S~:K PTL,~T #g 'N : KUPA~UR ~ANGI ~0~ 'OWNj ~ 1~ I.]NYT TYPE CATE 000 00:0 000 000 00.0 000 000 000 000 000 OOO 000 000 000 000 000 O08 00'6 O04 ,n .~U~BW,.R .A~ ACC: 6(~0~7 N #!. ,nAmE I.,~GG.En: 3~-.~.A~-~4 ,~: HCH ~I~IG ~DE F.~,U ?D SCO$TTY ******************************************************************************* ~?RY PLaCeS 4 9 4 0 ! ~TUM .e,.P~C%FTCA~TT(3~ P~LOCKS I~ SFRVlCE S~RWICE ;!NXT APl In O~D~'R ~ LDG TYP~ :PT FT 0 o .D mil mHm~ 7 1 ' DIL ~V 7 [ niT, ~API 7 ~I WD~ DU 4~ ~0 wD~t C/C3 ~2 4~ IOB VDw C/C3 a2 3~ ~NL rDw CPS 42 34 ~,T., I ~DM TN ~2 ~aT rDm a2 4~ PEP~ CDDM 66 73 65 6& API A.P'! WII,,E 0 0 o 0 0 0 46 0 o 0 0 o 0 0 o ]2 0 0 2 0 0 0 0 0 1 0 0 92 0 0 03 0 0 3 0 0 1 0 0 0 0 o 32 0 n SI 1 6O ,1, TN 0 ~E 4 4 4 4 4 4 o 0 0 0 o 0 0 0 fl o 0 0 0 SAMPLE 1 1 I, 1 1 1. I REPR 6tm ~T 4100,.~000 ~Ft.U ~.4 ~ -387.7500 ~R 36.9 {OB ~.3390 NCNb 1.~6~ 0 ~aT 3.40~2 ~N~ ~PT 4n0n.n000 SF~,U 135~.0 ). -466.0000 CR I 34~8 wCNb 2019.0 {nB '6805 NPA 3 9 ~uT ]q0n.00m0 SFLU {nB ~.75~8 ,CNL 201g.O {~T 3.~473 uN~A 3,4 {PT ~On.nOnO ~F~,U 1726.n ~ -464.7500 CR 64.4 063 50O 000 9~7 0o0 250 000 O23 0o0 6~.5 000 0~2 OhO 3?5 NP.I NP~I rC~b 41. 3, 46. 6, 4~, ~9~, 69, 47, 9434 50t9 0000 2500 6055 6797 5000 1250 4414 4316 0000 ~6~5 9336 0-215 CALl TLM Ci[,I DR~O CALI DRWO 4,039t -0,517! 8,5000 3,~859 O, ~. 766 · 4~5 8'3672 0,0176 P (~1. n. H0~ VE~IFIt'ATI~N [,?S?I~]G PA~£ 4 DB 7.7676 ~,!C~TL 2n8~.0000 FC~L 3700 0000 ~Ft,U -4,35 ~OnO CE PT 1726,00~0 6~,6250 2350..0000 FCN5 3.0777 ~T 3~on.nOOO -441.7500 9.~5~4 ~.57~1 ~NPA 84.~500 ~PHI 2!36,.0000 WC~L 3.7305 ~E PT 193~..0000 ,~000 ~C~!l,~ 2!4~. 1~4 :PT 3364.K00o -368.7500 CE 1.~9q0 ~CNL 4.5391 2000,.0000 ILD 36.~1~5 wP~I t644.0000 WC~L 4.R242 GR :Y,E N~W :~DTT ,001 :~VYC~ ~A~ : :YT FTL~ NA~E : 2~VTC~ HA~E ~D]T kwE :~4/04/ 9 ~GTN :oono t~g N~Nw . ~ooq7 3~TTNUA~I~N # CYT T~Pw ~lAU~ : )~MWN~S :T,I~RAR¥ TAPE CI~VTCF tlA~E : F'DTT ~,TF., :~4/04/ 9 0000 Clt, l 67.1875 10,0078 44,.~242 0 84.~500 24:,703~ Ib~ 64:.~ 4':6 DRHO 367 O0 6g.0605 DRHO ~4 ..7500 CAB! 36.:~1~5 8.3672 ~,000 1~,!4,37 2t 5 32,78~3 '0.'0449 11',0000 200.00.:0000 .~594 ~o o1.0.!40~ VFJOlFI~A'~InN LT$,q"'ING OAC.,E 5 tTG) N : ),~tTTNUA~I~N # :~1 )).,(M~"N?S :Ir,IRR~RY q"APK bi6 TAPE VERIFICATION LISTING VERIFICATION LISTIMG PAGE SERVICE NAM~ :EDIT ~EEL NA~E : CONTINUATION ~ :l)l PREVIOUS REEL : C(]~.MENTS : ** TAPE HEADE~~ ** .SER¥: IC~: P,~ A MOE :EDIT DATE :84/1 /21 ORIGIN :F51~ TAPE NAME C[~ ~INUATION ~ :01 PREVIOUS TAPE : COMME~T6 : RECORD TYPE 137 ** FILE ~EADER ** FILE ~AME :EDIT .o01 SER¥'ICE NAME VERSION ~ DATE : ~A.XIMUM LENGTH : 1024 FILE TYPE : PREVIOUS FILE : ** INFORNATION RECORDS ~NEM CONTENTS FN RANG: TOWN: SECT: COlIN: STAT~ CTRY: ARC[] ALASKA INC WEST SAK PIDUT ~9 KUPARUK 35 ~,SLOPE ~b~S~A USA ** COMMENTS ** UNIT TYPE CATE SIZE CODE 000 000 016 065 000 000 017 065 000 000 008 065 000 000 004 065 000 000 004 065 000 000 002 065 000 000 008 065 000 000 006 065 000 000 004 065 L%;P 010.H02 VERIFICATION LISTI~IG PAGE 2 , SCHLUMBERGER · ALASKA CO~PIJTING CENTER ************************************************************************************ COMPANY : ATLANTIC RICHFIELD COMPANY WELL : WEST SAK PILOT ~ 9 FIELD : KUPARUK COUNTY =. NORTH SLOPE BOROUGH STATE = ALASKA JOB NUMBER AT ACC: 69635 RUN #1, DATE LOGGED: 31-MAR-S4 bDP: T H~LSTEAD TV,O TVD TVD TV[) TVD TVD ~O,H02 VERIFICATION LISTING PAGE DATA FOR~'AT RECORD ** ;NTRY BbOCKS TYPE SIZE 2 1 4 8 4 9 4 16 1 0 1 IATUI~ SPECIFICATION BLOCKS INEH SERVICE SERVICE UNIT ID ORDER ~ LOG )EPT FT O0 ;FLU DIL OHMM O0 ~LD DIL OHM~ O0 iP DIL MV O0 IR DI b GAP I 00 RE[DR CODE 66 66 73 65 b6 66 API API API FIt, E TYPE CLASS MOD ~'0.~ 000 O0 0 0 220 Ol 0 0 120 46 0 0 120 44 0 0 010 O1 0 0 310 01 0 0 ENTRY 0 1 6O .lin 1 0 SiZE SPh REPR PROCESS CODE (OCT 4 1 68 00000000000000 4 ~ 68 00000000000000 4 ! 68 00000000000000 4 1 68 00000000000000 4 1 68 00000000000000 4 ~ 68 00000000000000 ,* DATA ** )EPT 403~,5000 SFLU ]P -40 ,0000 GR )EPT 4:000,0000 SFLU ~P -456.7500 GR )EPT 3900. 0000 SFLU ~p -460,7500 GR )EPT 3800.0000 SFLU ~P -470.5000 GR )EPT 3700,0000 SFLU ~p -456.5000 )EPT 3600,0000 SFLU 5P -428.2500 GR DEPT ~500,0000 SFLU SP 411,5000 DEPT 3400,0000 SFLU Sp -431.2500 GR DEPT 3312 0000 SFLU SP -368:7500 GR 3,4063 36,2500 1630,0000 ILD 36,2500 1630,0000 73,5000 1352,0000 ILD 60,6250 1726.0000 ILD 60,8750 1835,0000 lbD 62.2500 1726.0000 ILD 66.6250 1726,0000 ILO 65.0625 2000,0000 36.8125 3.9434 IbM 4,0391 3.7500 Ih~ 3.8672 3.5469 IbM 3,5313 2.8711 IL~ 2,8.828 5.3750 ILM 5.4063 11.7656 I~ ~0.8359 15.5703 ILM 15,4219 7,8711 ILM 7,7852 23,8594 iLN 2000,0000 ~VP O!0,H02 VERIFICATION I, ISTING PAGE 4 ** FILE TRAILER FILE NAME :EDIT .001 SERVICE NAME : VERSION # DATE : ~AXI~U~ LENGTH : 1024 FILE TYPE NEXT FILE NAME : ** RECORD TYPE 137 ** TAPE TRAILER ** SERVICE NAME :EDIT DATE :84/10/21 ORIGIN :FSIA TAPE NAME : CONTINUATION # :01 NEXT TAPE NAME COMMENTS : ** REEL TRAILER ** SERVICE NAME :EDIT DATE :84/10/21 ORIGIN : EEL NAME ONTiNUATION # :01 NEXT REEL NAME : iCOMMENTS ** RECORD TYPE 137 ** ,** RECORD TYPE 137 ** ********** EOF ********** ********** EOF **********