Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout201-1391. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program
Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Conductor Ext
Development Exploratory
Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number): 8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured 6,606' feet N/A feet
true vertical 4,272' feet N/A feet
Effective Depth measured feet 5,788' feet
true vertical feet 3,530' feet
Perforation depth Measured depth 5,986 - 6,259' feet
True Vertical depth 3,697' - 3,944' feet
Tubing (size, grade, measured and true vertical depth) 3 1/2" L-80 5,798' 3,537.5'
Packers and SSSV (type, measured and true vertical depth) SSSV: NONE
5,788' MD 3,530' TVD
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.
Prior to well operation:
Subsequent to operation:
13b. Pools active after work:
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Authorized Name and
Digital Signature with Date: Contact Name:
Contact Email:
Authorized Title: Contact Phone:
BAKER 80-40 GBH SEAL ASSEMBLYPACKER:
Well Inegrity Field Superviser
Brennen Green & Roger Mouser
N1927@conocophillips.com
907-659-7506
323-311
Gas-Mcf
Burst Collapse
measured
TVD
Production 6,553'
Casing
4,260'6,594'
Plugs
Junk measured
Length
118.7' 160.7'Conductor 16"
Size
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
201-139
5002923034-0000P.O. Box 100360, Anchorage, AK 995103. Address:
5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work:
ADL0025649
KUPARUK RIVER/WEST SAK OIL
ConocoPhillips Alaska, Inc.
KUPARUK RIV U WSAK 1C-119
MD
measured
true vertical
Packer
Representative Daily Average Production or Injection Data
Casing Pressure Tubing PressureWater-BblOil-Bbl
160.7'
5 1/2" x 3 1/2"
Sr Pet Eng: Sr Pet Geo: Sr Res Eng:
WINJ WAG
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
p
k
ft
t
Fra
O
s
201
6. A
G
L
PG
,
xt
Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov
Digitally signed by Brennen Green
DN: C=US, O=ConocoPhillips, CN=Brennen Green, E=
n1927@conocophillips.com
Reason: I am the author of this document
Location:
Date: 2024.06.10 16:36:54-08'00'
Foxit PDF Editor Version: 13.0.0
Brennen Green
By Grace Christianson at 8:35 am, Jun 11, 2024
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
June 10, 2024
Commissioner Jessie Chmielowski
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
Commissioner Chmielowski,
Please find the enclosed 10-404 from ConocoPhillips Alaska, Inc. for well KRU 1C-119 (PTD #
201-139) 8.5 Conductor extension.
Please contact Brennen Green or Roger Mouser at 659-7506 if you have any questions.
Sincerely,
Well Integrity Field Supervisor
ConocoPhillips Alaska, Inc.
Digitally signed by Brennen Green
DN: C=US, O=ConocoPhillips, CN=Brennen Green, E=n1927@conocophillips.com
Reason: I am the author of this document
Location:
Date: 2024.06.10 16:35:55-08'00'
Foxit PDF Editor Version: 13.0.0
Brennen Green
Date Event Summary
Executive
Summary Welded Conductor Extension
06/23/23 Received AOGCC sundry # 323-311 for conductor extension
05/31/24 8.5" Tree Rise, Gas readings in the cellar and in the conductor: Normal
06/08/24 NES welders welded 16" x 8.5" x .500" conductor extension, filled off set with .500" plate.
Last Tag
Annotation Depth (ftKB) Wellbore End Date Last Mod By
Last Tag: Corrected RKB 6,250.0 1C-119 8/12/2018 cjkenne
Last Rev Reason
Annotation Wellbore End Date Last Mod By
Rev Reason: Conductor Ext. 1C-119 6/8/2024 cborge1
Notes: General & Safety
Annotation End Date Last Mod By
NOTE: Welded 8.5" Conductor Ext 6/8/2024 cborge1
NOTE: View Schematic w/ Alaska Schematic9.0 5/22/2009 ninam
NOTE: MONOBORE INJECTOR, NO SSSV 4/15/2002 hipshkf
Casing Strings
Csg Des OD (in) ID (in) Top (ftKB)
Set Depth
(ftKB)
Set Depth
(TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread
CONDUCTOR 16 15.06 42.7 160.7 160.7 62.50 H-40 WELDED
PRODUCTION
5.5"x3.5" @5799'
5 1/2 4.95 40.7 6,594.1 4,260.4 15.50 L-80 BTC-MOD
Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string
Top (ftKB)
38.5
Set Depth
5,797.7
Set Depth
3,537.5
String Max No
3 1/2
Tubing Description
TUBING
Wt (lb/ft)
9.30
Grade
L-80
Top Connection
EUE8rdABM
OD
ID (in)
2.99
Completion Details: excludes tubing, pup, space out, thread, RKB...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal
ID (in)
38.5 38.5 0.00 HANGER 8.000 VETCO GRAY TUBING HANGER 3.500
5,704.0 3,461.1 36.30 GAS LIFT 4.725 CAMCO KBG-2-9 2.900
5,746.6 3,495.6 35.50 NIPPLE 4.480 CAMCO 'DS' NIPPLE w/2.812" NO
GO PROFILE
2.812
5,785.0 3,527.0 34.64 LOCATOR 4.500 BAKER NO GO LOCATOR SUB 3.000
5,786.2 3,528.1 34.61 SEAL 4.000 BAKER DEBRIS SEAL SUB 3.000
5,788.4 3,529.9 34.56 SEAL ASSY 4.000 BAKER 80-40 GBH SEAL
ASSEMBLY w/BOTTOM OF SHOE
@ 5797.71'
3.000
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ftKB)
Top (TVD)
(ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in)
42.0 42.0 0.00 PATCH SURFACE CASING PATCH
(OAL 9'8") API SL-X65-6, .432
WALL THICKNESS BELOW
OUTER CSG HANGER
(Reference AnnComm
database)
1/11/2007 5.500
Mandrel Inserts : excludes pulled inserts
Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°)
St
ati
on
No
/S Serv
Valve
Type
Latch
Type
OD
(in)
TRO Run
(psi) Run Date Com Make Model
Port
Size (in)
5,704.0 3,461.1 36.30 1 GAS LIFT DMY DK-1 1 0.0 8/16/2001 0.000
Perforations & Slots
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Linked Zone Date
Shot
Dens
(shots/ft)Type Com
5,986.0 6,002.0 3,697.3 3,711.2 WS D, 1C-119 4/15/2002 4.0 IPERF 2.5" HSD HB Guns
6,002.0 6,022.0 3,711.2 3,728.7 WS D, 1C-119 4/15/2002 4.0 IPERF 2.5" HSD HB Guns
6,054.0 6,072.0 3,756.9 3,772.9 WS B, 1C-119 4/15/2002 4.0 IPERF 2.5" HSD HB Guns
6,072.0 6,092.0 3,772.9 3,790.7 WS B, 1C-119 4/15/2002 4.0 IPERF 2.5" HSD HB Guns
6,105.0 6,130.0 3,802.4 3,825.0 WS A4, 1C-119 6/16/2008 6.0 APERF 2.5" HSD PJ OMEGA @ 60
DEG RANDOM PHASING
6,195.0 6,202.0 3,884.5 3,891.0 WS A3, 1C-119 6/16/2008 6.0 APERF 2.5" HSD PJ OMEGA @ 60
DEG RANDOM PHASING
6,250.0 6,259.0 3,935.8 3,944.2 WS A2, 1C-119 6/16/2008 6.0 APERF 2.5" HSD PJ OMEGA @ 60
DEG RANDOM PHASING
1C-119, 6/10/2024 3:49:22 PM
Vertical schematic (actual)
PRODUCTION 5.5"x3.5"
@5799'; 40.7-6,594.1
FLOAT SHOE; 6,592.9-6,594.1
FLOAT COLLAR; 6,529.2-
6,530.4
APERF; 6,250.0-6,259.0
APERF; 6,195.0-6,202.0
APERF; 6,105.0-6,130.0
IPERF; 6,072.0-6,092.0
IPERF; 6,054.0-6,072.0
IPERF; 6,002.0-6,022.0
IPERF; 5,986.0-6,002.0
SBE; 5,787.9-5,799.3
SEAL ASSY; 5,788.4
SEAL; 5,786.2
NIPPLE; 5,746.6
GAS LIFT; 5,704.0
TAM COLLAR; 1,000.4-1,003.3
CONDUCTOR; 42.7-160.7
PATCH; 42.0
HANGER; 40.7-43.9
HANGER; 38.5
KUP INJ
KB-Grd (ft)
45.80
RR Date
4/15/2002
Other Elev
1C-119
...
TD
Act Btm (ftKB)
6,606.0
Well Attributes
Field Name
WEST SAK
Wellbore API/UWI
500292303400
Wellbore Status
INJ
Max Angle & MD
Incl (°)
67.59
MD (ftKB)
2,428.58
WELLNAME WELLBORE1C-119
Annotation
Last WO:
End DateH2S (ppm) DateComment
SSSV: NONE
1. Type of Request:Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Conductor Ext
2. Operator Name:4. Current Well Class: 5. Permit to Drill Number:
Exploratory Development
3. Address: Stratigraphic Service
6. API Number:
7. If perforating:8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?N/A
Will planned perforations require a spacing exception?Yes No
9. Property Designation (Lease Number): 10. Field: Current Pools:
11.
Total Depth MD (ft):Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
6,606'N/A N/A
Casing Collapse
Conductor
Production
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
12. Attachments:Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations:OIL WINJ WDSPL Suspended
16. Verbal Approval:Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other:
Post Initial Injection MIT Req'd? Yes No
Spacing Exception Required? Yes No Subsequent Form Required:
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
3 1/2"
5 1/2" x 3 1/2"
118'
MD
160'160'
4,260'6,594'
Length Size
6,553'
TVD Burst
KUPARUK RIVER WEST SAK OIL
16"
4,272'
PRESENT WELL CONDITION SUMMARY
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL0025649
201-139
P.O. Box 100360, Anchorage, AK 99510 5002923034-0000
ConocoPhillips Alaska, Inc.
KUPARUK RIV U WSAK 1C-119
Proposed Pools:
Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft):Tubing Size:
L-80 5,798'
6/8/2023
SSSV: NONE
Packer: BAKER 80-40 GBH SEAL ASSEMBLY
SSSV: NA
Packer: 5,788' MD / 3,530' TVD
Perforation Depth MD (ft):
5,986' - 6,259'3,697' - 3,944'
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
AOGCC USE ONLY
Well Integrity Field Supervisor
Brennen Green & Roger Mouser
N1927@conocophillips.com
907-659-7506
m
n
P
2
6
5
6
t
Form 10-403 Revised 10/2022 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
By Grace Christianson at 3:52 pm, May 25, 2023
323-311
Digitally signed by Brennen Green
DN: C=US, O=ConocoPhillips, CN=Brennen Green, E=n1927@
conocophillips.com
Reason: I am the author of this document
Location:
Date: 2023.05.25 09:17:46-08'00'
Foxit PDF Editor Version: 12.0.1
Brennen Green
DSR-5/26/23
10-404
SFD 5/30/2023VTL 6/22/2023
X
Photo document all steps
GCW 06/22/2023
06/23/23Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2023.06.23 08:58:00
-08'00'
RBDMS JSB 062723
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
May 25, 2023
Commissioner Jessie Chmielowski
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
Dear Commissioner Chmielowski,
Please find the enclosed 10-403 application for Sundry Approval from ConocoPhillips
Alaska, Inc. for well KRU 1C-119 (PTD 201-139) to extend the conductor.
Summary: Conductor has subsided or well has grown ~8.5” or more. With AOGCC
approval we would like to add conductor material to cover the production casing.
Please contact Brennen Green or Roger Mouser at 659-7506 if you have any questions.
Sincerely,
Well Integrity Field Supervisor
ConocoPhillips Alaska, Inc.
ConocoPhillips Alaska, Inc.
Digitally signed by Brennen Green
DN: C=US, O=ConocoPhillips, CN=Brennen Green, E=n1927@
conocophillips.com
Reason: I have reviewed this document
Location:
Date: 2023.05.25 09:16:24-08'00'
Foxit PDF Editor Version: 12.0.1
Brennen Green
Conductor has subsided or well has grown ~8.5” or more.
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
Kuparuk Well 1C-119 (PTD 201-139)
SUNDRY NOTICE 10-403 APPROVAL REQUEST
May 25, 2023
This application for Sundry approval for Kuparuk Well 1C-119 is to extend the conductor
to original height to stabilize tree and prevent corrosion to the surface casing. At some
point during normal operations the conductor subsided or the well has grown ~8.5”.
With approval, the conductor extension will require the following general steps:
1. Remove landing ring from conductor if necessary.
2. Extend the conductor to starter head.
3. File 10-404 with the AOGCC post repair.
Casing Strings
Casing Description
CONDUCTOR
OD (in)
16
ID (in)
15.06
Top (ftKB)
42.0
Set Depth (ftKB)
160.0
Set Depth (TVD) …
160.0
Wt/Len (l…
62.50
Grade
H-40
Top Thread
WELDED
Casing Description
PRODUCTION
5.5"x3.5" @5799'
OD (in)
5 1/2
ID (in)
4.95
Top (ftKB)
40.7
Set Depth (ftKB)
6,594.1
Set Depth (TVD) …
4,260.4
Wt/Len (l…
15.50
Grade
L-80
Top Thread
BTC-MOD
Tubing Strings
Tubing Description
TUBING
String Ma…
3 1/2
ID (in)
2.99
Top (ftKB)
38.5
Set Depth (ft…
5,797.7
Set Depth (TVD) (…
3,537.5
Wt (lb/ft)
9.30
Grade
L-80
Top Connection
EUE8rdABMOD
Completion Details
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des Com
Nominal
ID (in)
38.5 38.5 0.00 HANGER VETCO GRAY TUBING HANGER 3.500
5,746.6 3,495.6 35.50 NIPPLE CAMCO 'DS' NIPPLE w/2.812" NO GO PROFILE 2.812
5,785.0 3,527.0 34.64 LOCATOR BAKER NO GO LOCATOR SUB 3.000
5,786.2 3,528.1 34.61 SEAL BAKER DEBRIS SEAL SUB 3.000
5,788.4 3,529.9 34.56 SEAL ASSY BAKER 80-40 GBH SEAL ASSEMBLY w/BOTTOM OF SHOE @
5797.71'
3.000
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Des Com Run Date ID (in)
42.0 42.0 0.00 PATCH SURFACE CASING PATCH (OAL 9'8") API SL-X65-6,
.432 WALL THICKNESS BELOW OUTER CSG
HANGER (Reference AnnComm database)
1/11/2007 5.500
Perforations & Slots
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Linked Zone Date
Shot
Dens
(shots/ft
)Type Com
5,986.0 6,002.0 3,697.3 3,711.2 WS D, 1C-119 4/15/2002 4.0 IPERF 2.5" HSD HB Guns
6,002.0 6,022.0 3,711.2 3,728.7 WS D, 1C-119 4/15/2002 4.0 IPERF 2.5" HSD HB Guns
6,054.0 6,072.0 3,756.9 3,772.9 WS B, 1C-119 4/15/2002 4.0 IPERF 2.5" HSD HB Guns
6,072.0 6,092.0 3,772.9 3,790.7 WS B, 1C-119 4/15/2002 4.0 IPERF 2.5" HSD HB Guns
6,105.0 6,130.0 3,802.4 3,825.0 WS A4, 1C-119 6/16/2008 6.0 APERF 2.5" HSD PJ OMEGA @ 60
DEG RANDOM PHASING
6,195.0 6,202.0 3,884.5 3,891.0 WS A3, 1C-119 6/16/2008 6.0 APERF 2.5" HSD PJ OMEGA @ 60
DEG RANDOM PHASING
6,250.0 6,259.0 3,935.8 3,944.2 WS A2, 1C-119 6/16/2008 6.0 APERF 2.5" HSD PJ OMEGA @ 60
DEG RANDOM PHASING
Mandrel Inserts
St
ati
on
N
o/Top (ftKB)
Top (TVD)
(ftKB) Make Model OD (in) Serv
Valve
Type
Latch
Type
Port Size
(in)
TRO Run
(psi) Run Date Com
1 5,704.0 3,461.1 CAMCO KBG-2-
9
1 GAS LIFT DMY DK-1 0.000 0.0 8/16/2001
Notes: General & Safety
End Date Annotation
4/15/2002 NOTE: MONOBORE INJECTOR, NO SSSV
5/22/2009 NOTE: View Schematic w/ Alaska Schematic9.0
Comment
SSSV: NONE
1C-119, 8/13/2018 10:12:01 AM
Vertical schematic (actual)
PRODUCTION 5.5"x3.5"
@5799'; 40.7-6,594.1
APERF; 6,250.0-6,259.0
APERF; 6,195.0-6,202.0
APERF; 6,105.0-6,130.0
IPERF; 6,072.0-6,092.0
IPERF; 6,054.0-6,072.0
IPERF; 6,002.0-6,022.0
IPERF; 5,986.0-6,002.0
SEAL ASSY; 5,788.4
SEAL; 5,786.2
NIPPLE; 5,746.6
GAS LIFT; 5,704.0
CONDUCTOR; 42.0-160.0
PATCH; 42.0
HANGER; 38.5
Last Tag
Annotation
Last Tag: Corrected RKB
End Date
8/12/2018
Depth (ftKB)
6,250.0
Last Mod By
cjkenne
Last Rev Reason
Annotation
Rev Reason: Tag
End Date
8/13/2018
Last Mod By
cjkenne
KUP INJ
KB-Grd (ft)
45.80
Rig Release Date
4/15/2002
Annotation
Last WO:
End Date
1C-119
H2S (ppm) Date...
TD
Act Btm (ftKB)
6,606.0
Well Attributes
Field Name
WEST SAK
Wellbore API/UWI
500292303400
Wellbore Status
INJ
Max Angle & MD
Incl (°)
67.59
MD (ftKB)
2,428.58
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Monday, June 13, 2022
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Austin McLeod
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
ConocoPhillips Alaska, Inc.
1C-119
KUPARUK RIV U WSAK 1C-119
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 06/13/2022
1C-119
50-029-23034-00-00
201-139-0
W
SPT
3530
2011390 1500
1115 1116 1116 1117
4YRTST P
Austin McLeod
5/15/2022
Monobore. MITIA
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:KUPARUK RIV U WSAK 1C-119
Inspection Date:
Tubing
OA
Packer Depth
60 1910 1850 1840IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitSAM220515191536
BBL Pumped:0.8 BBL Returned:0.7
Monday, June 13, 2022 Page 1 of 1
9
9
9
9
9
9
9
9
9
9
James B. Regg Digitally signed by James B. Regg
Date: 2022.06.14 09:44:40 -08'00'
•
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: DATE: Wednesday,May 16,2018
Jim Regg p' S Zl 1 t•i
P.I.Supervisor ` ` 7 I `� SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA,INC.
1C-119
FROM: Austin McLeod KUPARUK RIV U WSAK IC-119
Petroleum Inspector
Src: Inspector
Reviewed By: t� "
P.I.Suprv��h--
NON-CONFIDENTIAL Comm
Well Name KUPARUK RIV U WSAK 1C-119 API Well Number 50-029-23034-00-00 Inspector Name: Austin McLeod
Permit Number: 201-139-0 Inspection Date: 5/12/2018
Insp Num: mitSAM180513200117
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well 1c-119 "]Type Inj W TVD 3530 Tubing 980 - j 981 980 • 981 -
PTD 2011390 �Type Tests SPT Test psil 1500 IA 50 1830 1750 - 1740 '
BBL Pumped: 0.7 IBBL Returned: 0.6 - OA
Interval 4YRTST ;P/F P
L .
Notes: MIT-IA.Monobore-no OA
SCANNED JUN 0 4'1Z.Q 18
Wednesday,May 16,2018 Page 1 of 1
I •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Thursday,December 10,2015
TO: Jim Regg ee` i7417//5- SUBJECT: Mechanical Integrity Tests
P.I.Supervisor l f `{
CONOCOPHILLIPS ALASKA INC
1C-119
FROM: Lou Grimaldi KUPARUK RIV U WSAK 1C-119
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry. --
NON-CONFIDENTIAL Comm
Well Name KUPARUK RIV U WSAK 1C-119API Well Number 50-029-23034-00-00 Inspector Name: Lou Grimaldi
Permit Number: 201-139-0 Inspection Date: 10/4/2015
Insp Num: mitLG151004135307
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well 1C-119 - Type Inj W TVD 3530 Tubing 708 711 ' 707 - 707 -
PTD 2011390 - Type Test SPT Test psi 1500 - IA 440 1800 " 1730 - 1710 -
Interval 4YRTST P/F P v OA
Notes: •25bb1's diesel pumped and returned.Good test of Monobore injector.Good MIT results.IA/production casing hanger grown approximately
4"out of conductor head.Tree leaning.Advised Bruce Richwine(DHD sup.)andChris Murray(pad operator)to turn in for stabilization.
SCANNED SEP 7 9 2016
Thursday,December 10,2015 Page 1 of 1
MEMORANDUM • State of Alaska •
Alaska Oil and Gas Conservation Commission
DATE: Tuesday, May 25, 2010
TO: Jim Regg ~ L l ~(zs~,o
P.I. Supervisor l SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
IC-119
FROM: John Crisp KUPARUK RIV U WSAK 1C-119
Petroleum Inspector
Src: Inspector
NON-CONFIDENTIAL
Reviewed Bye
P.I. Suprv ~~~'
Comm
Well Name: KUPARUK RIV U WSAK 1C-119 API Well Number: 50-029-23034-00-00 Inspector Name: John Crisp
Insp Num: mitJCr100523172100 Permit Number: 201-139-0 Inspection Date: 5/21/2010
Rel Insp Num:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well ~ 1C-119 'Type Inj. N ' TVD~ 3530 / IA ~ 0
~'
~
~PT
~ 2210 2130 _2120
QA
P.T.D 2011390 T eTest
i TeSt si 1500
YP
p ~
~
~
-
---
---
-----
-- -
---
Interval axxTST p/p' P ~i Tubing' 6ao
~ 700
1_ L 700 i ~oo~ ~
Notes: 2.6 bb-s pumped for test. Monobore injector. Mandrel hanger off seat from conductor pipe. Wag flowline hanging on tree pulling casing hazd
in bind.
,,,, ~~~ ~~{{~~
~- C!,~.lG~ SQ~- --~v `-i ~~ ~ ~Z~ ~i 0
f(Ae~ ~~,r~ y ~ ~S~cf
G_I~cR
n ~~ 5
Tuesday, May 25, 2010 Page 1 of 1
Page 1 of 1
Regg, James B (DOA)
__
From: Regg, James B (DOA)
Sent: Friday, June 25, 2010 2:17 PM
~~~~ ~~(z~~~ ~
KRr..~ I c- I t~
PTA Zc)(-13°
To: NSK Well Integrity Proj; NSK Problem Well Supv
Cc: DOA AOGCC Prudhoe Bay; Maunder, Thomas E (DOA)
Subject: ANSI 1500 Flanges
Inspectors have been finding ANSI 1500 flanges installed on the IA of some wells when out to witness
MITs. The rated working pressure for these flanges is 3700psi. If I understand the situation correctly, the
ANSI 1500 flange is installed on the IA and would either be directly exposed to test pressure approaching
the rated working pressure, or could be exposed to excessive injection pressures in the case of TxIA
communication (e.g., high injection pressures on gas injectors or via thermal expansion). During
witnessed MITs in late May 2010, ANSI 1500 fllanges were found on West Sak gas injectors KRU 1 C-25
and 1C-27. In both occurances, CPAI was advised these are deficiencies. API defines the rated working
pressure of equipment to be the maximum internal pressure that the equipment is designed to contain or
control, and further notes that rated working pressure should not be confused with testing presssure (I
read that to say it is inappropriate to justify operating equipment at pressure exceeding rated work
pressure just because it was tested to the higher pressure). Exceeding the rated working pressure
represents an inappropriate risk to field personnel attending to the wells. Inspectors have not been able
to field verify if ANSI 1500 flanges have been hydrotested to proposed higher test pressure, and even if
the flange was tested, we question how you would account for the history (exposure to extreme temps,
harsh chemicals, corrosive fluids, etc.).
We are interested in understanding CPAI's safe operating practices regarding ANSI 1500 flanges. We
are also interested in reviewing any CPAI test policy that allows for the pressure rating of equipment to be
exceeded.
Other deficiencies noted during the KRU 1 C-pad inspections in late May:
- Two instances of tree flange adapters made up to tubing spool without full engagement of the nuts on
the studs (1 C-10, 1 C-15)
- KRU 1C-119 and 1 C-121 were noted to have mandrel hangers off seat from conductor casing; WAG
injection lines were hanging from tree without support, placing the casings in a sideways bind.
- KRU 1 C-174 was observed to have orifice meter wrapped in absorbent and an oily waste bag; use and
condition of the orifice meter here needs to be explained.
Please address these items.
Jim Regg
AOGCC
333 W.7th Avenue, Suite 100
Anchorage, AK 99501
907-793-1236
6/25/2010
11/10/08
~~
Schlumberger -DCS ~ i,: '"~.~ ` ~ ~ ~I ~ ,Y, ~ 4r ~~~~~
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well Job # Log Description
N0.4957
Company: Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Kuparuk
Date BL Color CD
iC-119 11978488 INJECTION PROFILE 10/16/08 1 1
iJ-101 11978491 PRODUCTION PROFILE 10/19/08 1 1
3H-02 12080447 INJECTION PROFILE ~ - ~~-- ~- 10/24/08 1 1
3K-24 11978500 SBHP 10/26/08 1 1
iJ-120 11978501 PRODUCTION PROFILE 10/27/08 1 1
3H-24 12080454 INJECTION PROFILE 10/28/08 1 1
3S-15 11978491 SBHP SURVEY - 10/18/08 1 1
1 H-08 12100434 INJECTION PROFILE - J 10/30/08 1 1
1H-09 12096560 INJECTION PROFILE,~z,C 1ot3°~~ (~-('~ 10/30/08 1 1
•
Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you.
!~ (~
~t ~
Schlumberger -DCS
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well Job #
(., P,. ( t
~ 4 1 Wu
Log Description
NO.4947
Company: Alaska Oil & Gas Cons t:omm
Attn: Christine Mahnkein
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Kuparuk
Date BL Color CD
10/29/08
3S-08C 12066554 MEM PRODUCTION PROFILE (~ - '~' 10/14/08 1 1
1C-26 11978487 SBHP SURVEY I _b ~ 10/15/08 1 1
iC-119 11978488 INJECTION PROFILE 10/16/08 1 1
3H-15 12080445 INJECTION PROFILE ~.. ~(/ 10/16/08 1 1
iC-121 11978490 INJECTION PROFILE 10/17/08 1 1
3H-18 12080446 INJECTION PROFILE ~ - p 10/17/08 1 1
iJ-159 12097431 PRODUCTION PROFILE ~ ~ 10/13/08 1 1
1 F-10 12080453 INJECTION PROFILE ~- 10/27/08 1 1
iC-121 11978490 INJECTION PROFILE (- 10/17/08 1 1
Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you.
•
•
Maunder, Thomas E (DOA)
• Page 1 of 1
From: Maunder, Thomas E (DOA)
Sent: Sunday, August 03, 2008 12:16 PM
To: 'NSK Prod Engr Tech'
Subject: 1 C-119 (201-139)
Sob and Bob(?),
1 am reviewing the 404 for the perforating recently in this well. The new perforations are not listed on the 404.
I will make the addition on the 404, but in the future please make sure that new perfs are listed.
Call or message with any questions.
Tom Maunder, PE
AOGCC
~~~N1~~~ Attu ~ ~ 2D0$
8!3/2008
___.
~~
• STATE OF ALASKA ~J~. ~ ~ 2Q~~
ALASKA OIL AND GAS CONSERVATION COMMISSION A(BSICB ~~~ ~ ~~„„ Ct}tt3 ~Oi111~fS51Dfi
REPORT OF SUNDRY WELL OPERATIONS ~nc~~~~c~e
1. Operations Performed: Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Other ^
Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Time Extension ^
Change Approved Program ^ Operat. Shutdown^ Perforate Q Re-enter Suspended Well ^
2. Operator Name: 4. Well Class Before Work: 5. Permit to Drill Number:
ConocoPhillips Alaska, InC. Development ^ Exploratory ^ 201-139
3. Address: Stratigraphic ^ Service^ 6. API Number:
P. O. Box 100360, Anchorage, Alaska 99510 50-029-23034-00 •
7. KB Elevation (ft): 9. Well Name and Number:
RKB 102' ~ 1 C-119
8. Property Designation: 10. Field/Pool(s):
ADL 25ti49•ALK 467 Kuparuk River Field !West Sak Oil Pool
11. Present Well Condition Summary:
Total Depth measured 6606' • feet
true vertical 4272' feet Plugs (measured)
Effective Depth measured 6001' feet Junk (measured)
true vertical 3710' feet
Casing Length Size MD ND Burst Collapse
Structural
CONDUCTOR 158' 16" 158' 158'
PRODUCTION 5697' S-1/2" 5799' 3439'
LINER 795' 3-1/2" 6594' 4260'
Perforation depth: Measured depth: 5986'-6022', 6054'-6092' rcil'~ "L\3C~ E (~~~5° ~:~~ ~~~~~ `~~ J~
true vertical depth: 3898'-3729', 3729'-3791'
Tubing (size, grade, and measured depth) 3-1/2" , L-80, 5785' MD.
Packers &SSSV (type & measured depth) PKR= Baker 80-40 GBH-22 Seal Assembly PKR= 5799'
no SSSV no SSSV
12. Stimulation or cement squeeze summary:
Intervals treated (measured) N/A
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure
Prior to well operation 388 100 980
Subsequent to operation 230 150 918
14. Attachments 15. Well Class after work:
Copies of Logs and Surveys run _ Exploratory ^ Development ^ Service
Daily Report of Well Operations _X 16. Well Status after work:
Oil^ Gas^ WAG^ GINJ^ WINJ^ WDSPL^
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
308-208
contact Bob Christensen /Bob Buchholz
Printed Name Robe
t W
BB
uchholz
Titl ,~~,~ .
Production En
ineerin
Technician
. e g
g
r
~'`~ ..
,
`~~
'_"
Signature Phone: 265-6471 Date .~~t~L/Gr ~'
f
~'~c,~'
e
/ ` ~ ~ ~ °" °~ Pr aced b Sharon All -Drake 263-4612
Form 10-404 Revised 04/2006 ~:. 1~U1; ~! ~# ~Dd~ Submit Ori '~I Ord
ORI INAC. '~~7&~°b
l"/
1C-119
DESCRIPTION OF WORK COMPLETED
SUMMARY
Date Event Summary
6/16/2008
PERFORATED WITH 2.5" 6 SPF 60 DEG PHASING POWERJET OMEGA GUNS FROM
6105'-6130', 6195'-6202', AND 6250'-6259'. CHARGE DATA: PENE 30.6", ENTRANCE
HOLE 0.32". TAGGED TD AT 6359' ELM.
• •
Q a
SARAH PALIN, GOVERNOR
CO~L'+~R~O n ~~+ I~ 333 W. 7th AVENUE, SUITE 100
--77 Aii t.o~~`~~•~~~ttt~~'iiiiii----777 0l` ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Robert Buchholz
Production Engineering Technician
ConocoPhillips Alaska. Inc. ~~~NE~ JUN s. ~ 2008
PO Box 100360
Anchorage, AK 99510
Re: Kuparuk River Field, West Sak Oil Pool, 1C-119
Sundry Number: 308-208
Dear Mr. Buchholz:
fib,--~9
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
For your future references, please note a Sundry Application is not required
to perforate intervals within the same pool.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (90?)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission derision to Superior Court unless rehearing has been
requested.
1 ~~~
DATED this -day of June, 2008
Sincerely,
Daniel T. Seamount, Jr.
Chair
Encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPRO~Y94~~i~ ~` ~~~' ~nr'~• ~~~ nri
Anchwnra~e
20 AAC 25.280
1. Type Of Request: Abandon ^ Suspend ^ Operational Shutdown ^ Perforate^ Waiver ^ Other ^
Alter casing ^ Repair well ^ Plug Perforations ^ I Time Extension ^
Change approved program ^ Pull Tubing ^ Perforate New Pool ^ ~~ ~~~ ~ Re-enter Suspended Well ^
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
ConocoPhillips Alaska, InC. Development ^ Exploratory ^ 201-139
3. Address: Stratigraphic ^ Service Q 6. API Number:
P. O. Box 100360, Anchorage, Alaska 99510 50-029-23034-00 -
7. If perforating, closest approach in pool(s) opened by this operation to nearest property line 8. Well Name and Number:
where ownership or landownership changes:
Spacing Exception Requires? Yes NO ^~ 1C-119
9. Property Designation: 10. KB Elevation (ft): 11. Field/Pool(s):
ADL 25649 ALK 467 RKB 102' Kuparuk River Field /West Sak Oil Pool
12. PRESENT WELL CONDITI ON SUMMARY
Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ff): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
6606' 4272' 6001' 3710'
Casing Length Size MD TVD Burst .Collapse
CONDUCTOR 158' 16" 158' 158'
PRODUCTION 5697' S-1/2" 5799' 3439'
LINER 795' 3-1 /2" 6594' 4260'
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
5986'-6022', 6054'-6092' 3698'-3729', 3729'-3791' 3-1/2" L-80 5785'
Packers and SSSV Type: Packers and SSSV MD (ft)
PKR= Baker 80-40 GBH-22 Seal Assembly PKR= 5788'
no SSSV no SSSV
13. Attachments: Description Summary of Proposal Q 14. Well Class after proposed work:
Detailed Operations Program ^ BOP Sketch ^ Exploratory ^ Development ^ Service
15. Estimated Date for 16. Well Status after proposed work:
Commencing Operations: June 13, 2008 Oil ^ Gas ^ Plugged ^ Abandoned ^
17. Verbal Approval: Date: WAG ^ GINJ ^ WINJ^ WDSPL ^
Commission Representative:
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Bob Christensen /Bob Buchholz
Printed Name Robert W. Buchholz Title: Production Engineering Technician
Signature ~ ~ - Phone 659-7535 Date eS~/~/(~
Co fission Use Onl
Sundry Number:
Conditions of approval: Notify Commission so that a representative may witness ~~
Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Location Clearance ^
r-'•,
3 ~.
Other: ~° C~ ~~ti~-k. C~*::~C°C~
"~` \"~,~~„' r \~ L'
~~ S '
~ ~
T ~S ~
`hl"
`
'
*
4
`
~ ~ Zoo
Subsequent Form Required: ~~~~ ~-~ ~~~, ~~-
. S ~ ~ur~ ~ ~ ~na~
(,'~
APPROVED BY !r ~ / ~~ A
Approved by: ~ COMMISSIONER THE COMMISSION Date: (y ( ~ U
Form 10-403 Revised 06/2006 ~ ~ ~ ~ ~ ~ ~ mit in Duplicate
• 1 C-119 •
DESCRIPTION SUMMARY
OF PROPOSAL
ConocoPhillips Alaska Inc. requests approval to begin additional A-sand perforations after a
fill clean on well 1 C-119. Target area 6105'-6259' md.
• •
KRU 1 C-119
ConocoPhillips Alaska, Inc.
1 C-119
Ty e: INJ An le~_de
API: 500292303400 Well
ruBiNG SSSV Type: NONE _
Orig 4/15/2002 Angle @ TD: 19 deg @ 6606
(o-s7es,
oD:3.soo,
Com letion:
iD:z.ssz) Annular Fluid: Last W/O: Rev Reason: U date
=ROOUCnoN - Reference Log: Date: Last U date: 1/21/2007
Ref Log
(0-5799, -- -
Last Tag: 16056'
I _
-- --- -- - --- --
TD: 6606 ftK6
oDS.soo,
wttsso) _
Last Ta Date:_ 11/29/2006
__
i
t
i
LL STR
' ` C _
Max Hole An le:' 68 de 2429
MPLETION
INGS MONOBORE TAPERED CO
ng. -A
as
ng S
r
Description _
- - -
Size Top Bottom 1 __ ND __ 1Nt Grade Thread
CONDUCTOR 158 158 62.50 H-40 WELDED
16.000 0
PRODUCTION _ _ _
5.500 0 5799 3539 15.50 L-80_ _ BTC-M
NiP PRODCUTION 3.500 5799 6594 4260 9.30 L-80 EUE8RD
(s7as-57x7, Tubin Strin -TUBING
OD:4.520)
Size - - __ _- __ T__op_
_ _ Bottom ___ TVD Wt Grade Thread
i 3.500 0
~ 5785 3527 9.30 L-80 EUE8RD
NAP -
Pertorations Summa
(s7as-s7es,
Interval TVD _
Zone Status Ft SPF Date T e Comment
oD:a.soo) 5986 - 6022 3698 - 3729 WS D 36 4 4/15/2002 IPERF 2.5" HSD HB Guns
- - - -
SaE -
6054 - 6092 3757 - 3791 ' WS B 38 4 4/15/2002 IPERF 2.5" HSD HB Guns
(5787-5788 Gas Lift MandrelsNalve s
oD oooj
St MD TVD j Man Mfr _ _ _
Man Type V Mfr V Type V OD Latch Port TRO i Date Run Vlv
I Cmnt
_
1 5704 346~CAMCO __ _
KBG-2-9 DMY 1.0 DK-1 0.000 0 8/16/2001
SEAL -- -----
(s7as-s7as, Other lu s equi etc . COMPLETION
0o a ooo> De th TVD ~ Type Descrl lion ID
14 14 PATCH SURFACE CASING PATCH (OAL 9'8") API SL-X65-6, .432 WALL 0.000
THICKNESS 1/11/2007
5746 3495 NIP CAMCO'DS' NIPPLE W/NO GO PROFILE 2.812
5785 3527 NIP KE_ R_ DEBRIS SEAL SUB 3.000
BAKER NO GO SUB w!4" BA
5787 3529 SBE _
BAKER 12' SBE 4.000
SHOE
(s7s~s7ss, 5788 3530 SEAL BAKER 80-40 GBH-22 SEAL ASSEMBLY 3.000
oD:s.soo) 5798 3538 SHOE MULE SHOE FOR 3/5" MONOBORE TUBING 4.950
5799 3539 XO 5,5" x 3.5" CROSSOVER 3.500
_
5850 3581 WRP WRP set 11/30/2006 0.000
6592 4258 SHOE WEATHERFORD FLOAT SHOE FOR 3.5" CASING 2.992
xo
(s7ss-seoo,
OD:5.000)
'RODCUTION
(5799594,
OD:3.500,
Wt9.30)
Perf
(5986&002)
Perf
(6002F>022)
Perf
(6054072)
Perf
(6072-6092)
1C-119 10-403 (Stimulate box checked in error)
Maunder, Thomas E (DOA)
From: NSK Prod Engr Tech [n1139@conocophillips.com]
Sent: Wednesday, June 18, 2008 1:12 PM
To: Maunder, Thomas E (DOA)
Cc: NSK West Sak Prod Engr; NSK Well Integrity Proj; Targac, Gary
Subject: 1 C-119 10-403 (Stimulate box checked in error)
•
Page 1 of 1
ab~_ ~3 q
Tom,
I have confirmed with the West Sak Production Engineer that, at this time, ConocoPhillips Alaska Inc. does not
plan to stimulate well 1 C-119 as indicated in the 10-403 Sundry Application dated 06/10!08. The Stimulate box
was checked in error.
Bob Buchholz /Bob Christensen
ConocoPhillips Alaska, Inc.
Greater Kuparuk Area
Production Engineering Technician
Office (907) 659-7535 NSK-69
Pager (907) 659-7000 (924)
This email may contain confidential information. If you receive this a-mail in error, please notify the sender and
delete this email immediately.
6/18/2008
10-403 sundry request to perforate new interval within a pool, 1C-119 PTD # 201-139 Page 1 of 1
•
Maunder, Thomas E (DOA)
L_.J
From: Maunder, Thomas E (DOA)
Sent: Monday, June 16, 2008 2:51 PM
To: 'NSK Well Integrity Proj'; Regg, James B (DOA)
Cc: NSK Problem Well Supv; NSK Prod Engr Tech
Subject: RE: 10-403 sundry request to perforate new interval within a pool, 1C-119 PTD # 241-139
Perry, et al,
You are correct that a sundry is not needed since the perforation will be in the West Sak.
Since the sundry has already been submitted and partially processed we will complete that processing.
As you note, a 404 is required.
Call or message with any questions.
Tom Maunder, PE
AOGCC
From: NSK Well Integrity Proj [mailto:N1878@conocophillips.com]
Sent: Monday, June 16, 2008 1:38 PM
To: Maunder, Thomas E (DOA); Regg, James B (DOA)
Cc: NSK Problem Well Supv; NSK Prod Engr Tech
Subject: 10-403 sundry request to perforate new interval within a pool, iC-119 PTD # 201-139
Tom,
A 10-403 sundry request was submitted to your office seeking approval to perforate the West Sak A sands after a
tubing fill clean out.
It has come to our attention that perforating a new interval within a pool in a service well only requires a 10-404
per the matrix.
Please discard the aforementioned 10-403 sundry request. We will submit the appropriate 10-404 to your office
following the clean out and perforation.
Let me know if you have any questions.
Sincerely,
Perry Klein
Well Integrity Project Supervisor
ConocoPhillips Alaska, Inc.
Desk Phone (907) 659-7043
Cell Phone (907) 943-1244
6/16/2008
•
Maunder, Thomas E (DOA)
From: NSK Well integrity Proj [N1878@conocopfiillips.com]
Sent: Thursday, January 24, 2008 7:20 AM
To: Maunder, Thomas E (DOA)
Cc: IdSK Problem Well Supv
Subject: RE: 1C-174, 1C-121, 1C-123, 1C-190, 1C-119
Attachments: 1C-119 10-404 030907.PDF
iC-119 10-404
~30907.PDF (92 K...
Tom,
Here is a scanned copy of our original.
Let me know if you need any additional
MJ Loveland
a~~_~~q,
documentation,~,~~~~ JAN ~ `~ 2008
Well Integrity Project Supervisor
ConocoPhillips Alaska, Inc.
Office (907) 659-7043
Cell (907} 943-1687
-----Original Message-----
From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov]
Sent: Wednesday, January 23, 200$ 4:59 PM
To: NSK Well Integrity Proj
Cc: NSK Problem Well Supv
Subject: RE: 1C-174, 1C-121, 1C-123, 1C-190, IC-119
MJ, et al,
I had to bring up a past issue. I was cleaning out some emails and ran across this one.
I checked the files and found 404s changing status back to 1-winj for all wells except
1C-119 (201-139}. Our records do show the status as 1-winj with an effective date of
9/1/2006 (the end of the approved WAG injection project). We must have received one, but
maybe there is a mis-file. Could you check your files to see if you have a 404 for 1C-119
changing the status back?
Thanks. Call or message with any questions.
Tom Maunder, PE
AOGCC
-~,---Original Message-----
From. SK Well Integrity Proj [mailto:N1878@conocophillips.com]
Sent: Mo March 19, 2007 9:14 AM
To: Thomas Ma er
Cc: NSK Problem Supv /~
Subject: RE: IC-174, -121, 1C-123, 1C-190, 1C-119
Thanks Tom
MJ
-----Original Message-----
From: Thomas Maunder to:tom_maunder@admin.state. .us]
Sent: Monday, Mar 9, 2007 9:01 AM
To: NSK Prod gr Tech
Cc: NSK Integrity Proj; Allsup-Drake, Sharon K
Sub' 1C-174, 1C-121, 1C-123, 1C-190, 1C-119
1
•
ConocoPhillips
March 9, 200?
Tom Maunder, P.E.
Senior Petroleum Engineer
State of Alaska, Oil & Gas Conservation Commission
33 W. 7~' Ave. Ste. 100
Anchorage, AK 99501
•
Robert Buchholz /Robert Christensen
Production Engineering Tech.
Cheater Kuparuk Unit , NSK-69
PO Box 196105
.Anchorage, AK 99519-6105
Phone: (907) 659-7535
Fax: 659-7314
~c~~-~~~
Dear Mr. Maunder,
ConocoPhillips Alaska, Inc. has completed the West Sak FOR Pilot Project.
Enclosed you will find 10-404 Report of Sundry Well Operation for ConocoPhillips
Alaska, Inc. well 1 C-119 (PTD 201-139). The report records the change of well status
from WAG Injection to Water Injection Service.
If you have any questions regarding this matter, please contact myself or Robert
Buchhloz at 659-7535.
Sincerely,
~' ju-e~
Robert D. Christensen
Attachments
C
•
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1.Operations Performed: Abandon ^ Repair Well ^ Pluq Perforations ^ Stimulate ^ Other 0 WAGIN to WINJ
Alter Casing ^ Pull Tubing ^ Pertorate New Pool ^ Waiver ^ Time Extension ^
Change Approved Program ^ Operat. Shutdown^ Perforate ^ Re-enter Suspended Well ^
2. Operator Name: 4. Current Well Status: 5. Permft to Drill Number:
ConocoPhillips Alaska, InC.. Development ^ Exploratory ^ 201-1391
3. Address: Strati ra hic
g p ^ Service ~
^
6. API Number.
P. O. Box 100360, Anchors e, Alaska 99510 50-029-23034-00
7. KB Elevation (ft): 9. Well Name and Number.
RKB 102' 1 G119
8. Property Designation: 10. Field/Pool(s):
Kuparuk River Unit Kuparuk River Field /West Sak Oil Pool
11. Present Well Condition Summary:
Total Depth measured 6606' feet
true vertical 4272' feet .Plugs (measured)
Effective Depth measured feet Junk (measured)
true vertical feet
Casing Length Size MD TVD Burst Collapse
Structural
CONDUCTOR 158' 16" 158' 158'
PRODUCTION 5697' 5-112" 5799' 3539'
PRODCCTION 795' 3-1/2" 6594' 4260'
Perforation depth: Measured depth: 5988
true vertical depth: 3698
Tubing (size, grade, and measured depth) 3-1/2" , L-80, 5785' MD.
Packers &SSSV (type 8 measured depth) no packer
no SSSV no SSSV
12. Stimulation or cement squeeze summary:
Intervals treated (measured)
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
OiI-Bbf Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure
Prior to well operation 185 250 890
Subsequent to operation 185 250 890
14. Attachments 15. Well Class after proposed work:
Copies of Logs and Surveys run _ Exploratory ^ Development ^ Service 0
Daily Report of Well Operations _ 16. Well Status after proposed work:
Oil^ Gas^ WAG^ GINJ^ WINJ ~ WDSPL^
17. f hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA if C.O. Exempt
N/A
°~~~ Bob Ghnstensen /Bob Buchholz
Printed Name Rob. rt D./ 1 tensen Title Production Engineering Technician
Signature }/~~~~ C~~lVI Phone 659-7535 Date 3/~'~a
Form 10-404 Revised 04/2004 Submit Original Only
•
•
Maunder, Thomas E (DOA)
Frorn: NSK Weil integrity Proj [N1878@conocophillips.com]
Sent: Monday, March 19, 2007 9:14 AM
To: Thomas Maunder
Cc: NSK Problem Welt Supv
Subject: RE: 1C-174, 1C-121, 1C-123, 1C-190, 1C-119
ao3-~~`"t~ ~ ~ ~ ~ dot'\3~
Thanks Tam c~03'QQ~j
~Ot-O~sC~ ~p~~~
MJ
-----original Message-----
From: Thomas Maunder [mailto:tom maunder@admin.state.ak.us]
Sent: Monday, March 19, 2007 9:01 AM
To: NSK Prod Engr Tech
Cc: NSK Well Integrity Proj; Allsup-Drake, Sharon K
Subject: 1C-174, 1C-121, 1C-123, 1C-190, 1C-119
All,
We have received 404s changing the status of these WS injectors back to lwnj. This
change was requested in a review meeting held with the project engineers. Authority to
inject MI in these wells expired
$/31/06 according to AIO 2B.001. In the Commission records, the effective date of the
status change will be 9/1/06.
Call or message with any questions.
Tom Maunder, PE
AOGCC
1
.
.
Conoc6Phillips
Alaska
RECEIVED
APR 1 8 2007
Alaska Oil & Gas Cons. Commission
Anchorage
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
April 16, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
d,Ð\ - \3~
Dear Mr. Maunder:
Enclosed please find a spreadsheet with a list of wells from the Kuparuk field (KRU). Some of
these wells were found to have a void in the conductor by surface casing annulus. The voids that
were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The
remaining volume of annular void subsequently was filled with a corrosion inhibiter engineered
to prevent water from entering the annular space. As per previous agreement with the AOGCC,
this letter and spreadsheet serves as notification that the treatments took place and meets the
requirements of form 10-404, Report of Sundry Operations.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
~~~
ConocoPhillips Well Integrity Project Supervisor
.
.
ConocoPhillips Alaska Inc.
Suñace Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
~prl ,
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD# cement pumped cement date inhibitor sealant date
ft bbls ft gal
1 C~25 119-031 9'4" 0.8 14" 4/14/2007 3.8 4/15/2007
1C-119 201-139 25'6" 4.8 16" 4/14/2007 5.4 4/15/2007
1C-121 201-080 11' 2.0 18" 4/8/2007 8.6 4/15/2007
1C-131 201-185 12' 1" 1.8 16" 4/8/2007 6.8 4/15/2007
1C-135 201-220 11' 1.3 10" 4/8/2007 2.4 4/15/2007
1C-172 203~095 10'8" 1.5 18" 4/14/2007 6.6 4/15/2007
1 H-02 193-008 14' 6" 2.0 4/5/2007 3.3 4/15/2007
1 H-09 193~029 11" n/a 11" n/a 4.9 4/15/2007
1 H-17 192~130 20" n/a 20" n/a 7.5 4/15/2007
Kuparuk Field
A 116 2007
MEMORANDUM
.
State of Alaska
.
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg
P.I. Supervisor
K~q Z,(J~()7
DATE: Monday, February 12, 2007
SUBJECT: Mechanicallntegnty Tests
CONOCOPI-HLLIPS ALASKA INC
IC-[ 19
KUPARUK RIV U WSAK IC-119
dO ~ - ~31
FROM:
Bob Noble
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. Suprv 5EP-
Comm
NON-CONFIDENTIAL
Well Name: KUPARUK RIV U WSAK IC-119 API Well Number 50-029-23034-00-00 Inspector Name: Bob Noble
Insp Num: mitRCN07021 0 172926 Permit Number: 201- 139-0 Inspection Date: 2/10/2007
Rei Insp N urn
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
, ¡Type Inj. ¡ W , ! I ---
Well IC-119 !TVD 3530 IA 1200 2000 2000 2000 i
I ! !
I 2011390 !TypeTest j SPT i Test psi ,
P.T. 1500 OA i
, --r----
Interval WRKOVR P/F P Tubing: 2280 2280 2280 2280
~-_.
Notes Pretest pressures remained stable for 30 min. before the test.
$~ED FEB 2 '7 2lJD?
Monday, February 12,2007
Page 1 of 1
lC-119 PTD # 201139 - Witnessed MIT results, post surface casing...
e
e
«KRU 1C-119 02-10-07.xls» Gentlemen,
Enclosed are the passing MIT results for 1C-119 post surface casing
excavation and repair.
I'm removing 1C-119 from the Monthly Failed MIT report.
Let me know if you have any questions.
Sincerely,
Perry Klein
SCANNED FEB 2 0 2007
Problem Well Supervisor
office (907) 659-7224
Cell (907) 943-1244
Pager (907) 659-7000 x909
n161 11. com
Content-Description: KRU1 C-119 02-10-07 .xls
KRU lC-119 02-10-07.xls Content-Type: application/vnd.ms-exceI
Content-Encoding: base64
1 of 1 2/12/20077: 16 AM
e
e
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
Email to:Bob_Fleckenstein@admin.state.ak.us;Jim_Regg@admin.state.ak.us;Tom_Maunder@admin.state.ak.us
OPERATOR:
FIELD / UNIT / PAD:
DATE:
OPERATOR REP:
AOGCC REP:
ConocoPhillips Alaska Inc.
Kuparuk / KRU / 1C-119
02/10/07
Perry Greenwood
Chuck Scheve / Bob Noble
\~~
,/
'J\
~
Packer Depth Pretest Initial 15 Min. 30 Min.
Well1C-119 I Type Ini. I W TVD I 3,530' Tubing 2280 2280 2280 2280 Interval I 0
p.T.D.b011390 I Type test I P Test psil 1500 Casing 2020 2000 2000 2000 P/FI P
Notes: Initial test post surface casing patch OA
Weill 1 Type Inj.1 TVD I Tubing Interval I
p.T.D.1 I Typetesd Test psil Casing P/FI
Notes: OA
Weill I Type Inj.1 TVD I Tubing Interval
p.T.D.1 1 Typetesd Test psil Casing P/FI
Notes: OA
Weill I Type Inj.1 TVD I Tubing Interval I
p.T.D.1 1 Typetesd Test psi! Casing P/FI
Notes: OA
Weill Type In¡.1 TVD I Tubing I ntervall
p.T.D.1 I Typetesd Test psil Casing p/FI
Notes: OA
Weill I Type Inj.1 TVD I Tubing Interva_U
P.T.D.I I Tvpe test I Test psi! Casing P/FI
Notes: OA
D = Drilling Waste
G=Gas
I = Industrial Wastewater
N = Not Injecting
W = Water
MIT Report Form
BFL 9/1/05
M = Annulus Monitoring
P = Standard Pressure Test
R = Internal Radioactive Tracer Survey
A = Temperature Anomaly Survey
D = Differential Temperature Test
I = Initial Test
4 = Four Year Cycle
V = Required by Variance
T = Test during Workover
0= Other (describe in notes)
KRU 1C-119 02-10-07.xls
.
.
ConocJPhillips
Alaska
. P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
January 13, 2006
RECE\VEO
JAN 1 6 20G7
, r': Cons. commission
.Alaska 01\ &. o3S
k _." _. :.- _.......,. ~l1chOfage
."_.;..."._.",, <t'
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
~o FEB 0 1,2007
Dear Mr. Maunder:
Enclosed please find 10-404 Report of Sundry Well Operations for ConocoPhillips
Alaska, Inc. welllC-119 (PTD 201-139). The reports record the completionofthe
surface casing excavation, inspection, and repair on the well. ,/
Please call J erryDethlefs or MJ Loveland at 659-7043 or Marie McConnell or Perry
Klein at 659-7224 if you have any questions.
Well Integrity Projects Supervisor
Attachments
RECEIVED
JAN 1 6 2001
.4laska Oil & G.
as Cons C . '
REPORT OF SUNDRY WELL OPERATIONS Anchora f; Df11mlssion
Stimulate 0 Other 0
Waiver 0 Time Extension 0
Re-enter Suspended Well 0
5. Permit to Drill Number:
201-1391 .
6. API Number:
50-029-23034-00
.
.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Abandon 0
Alter Casing 0
Change Approved Program 0
2. Operator Name:
ConocoPhillipsAlaska, Inc.
3. Address:
Repair Well 0
Pull Tubing 0
Operat. ShutdownD
1. Operations Performed:
P. O. Box 100360, Anchorage, Alaska 99510
7. KB Elevation (ft):
RKB 102'
8. Property Designation: , lb
Kuparuk River Unit ,dJ;>(,.. '¡..ç(pr{
11. Present Well Condition Summary:
(.1.; .c:;.7
Total Depth
6606' ,
4272'
measured
true vertical
Effective Depth
measured
true vertical
Casing
Structural
CONDUCTOR
PRODUCTION-tapered
PRODUCTION-tap.ered
Length
Size
158'
5697'
795'
16".
5-1/2"
3-1/2"
Perforation depth:
Measured depth:
5986
true vertical depth: 3698
Tubing (size, grade, and measured depth) 3-1/2" , L-80, 5785' MD.
Packers & SSSV (type & measured depth) no packer
no SSSV no SSSV
12. Stimulation or cemèntsquèezesumh1àry:
Intervals treated (rrîeäsured)
Treatment descriptions including voluh1eSlJsed andJinalpressÜre:
Plug Perforations 0
Perforate. New Pool 0
Perforate 0
4. Current Well Status:
Development 0
Stratigraphic 0
Exploratory 0
Service
0'
9. Well Name and Number:
1C-119 -
15. Well Class after proposed work:
Exploratory .0 Development 0
16. Well Status after proposed work:
CuD GasD,WAG0
17; I hereby certify thattheforegoing istrue and correct to the best of my knowledge.
10. Field/Pool(s):
Kuparuk River Field 1 West Sak Oil Pool
feet
feet
feet
feet
. Plugs (measured)
Junk (measured)
MD
TVD
Burst
Collapse
158'
5799'
6594'
158'
3539'
4260'
13.
g~Þr~S~I1t.åtj\,Ï~.[)~IIY~)/~l'ä9E!PrOd..uction.. or·.lnJeption.D~.t~
O¡hSbIGas·Met Water"i3bf
Signature
ORIGINAL
Service 0
GINJD
WINJD
'- i __,__~
~h ~;-~ ~øß~?
)5 Submit Örinil1:orOnlv
.
.
~¡
1 C-119
DESCRIPTION OF WORK COMPLETED
SUMMARY
Date Event Summary
12/31/2006Remove 25.5' of conductor.
117/2007 Weld patch on SF casing 3 pass weld on top and bottom side of patch, TIlIO=OIOIO. Purge IA
with N2 drill hole in old SF casing to strap FL, FL 3' below bottom of weld. 9'2" patch on SF
casing. Casing material. API, 5L~X65 6" .432.
1/8/2007IAOGCC Inspector (Grimaldi) on site to see excavation and patched casing.
1/10/2007
Install 6" Patch on SC. Initial TIl= SliD. Purged N2 across IA. A existing patch ( 9' 2" , API 5L ~
X65 - 6" .432" wall thickness), was already installed @ 14' 3" down from the bottom of the
mandrel hanger. Another 6" patch (API 5L - X65 6" .432" wa/l thickness ), is being welded
into place at the bottom of the existing patch. TotalSC patch length 9' 8". Final TIl= SilO
1/11/2007 Patch weldon IA Intial TIl = 010, Rigged up purge hoses and purged N2 across IA. Assist
welders filling pits. UT & crack check on welded areas. Wrapped entire SC w/Denso wrap.
Weld 25.5' of 16" 62.5# .375 conductor. TIl = 010
1/12/2007MITIA ~ passed, Initial TIl= SilO, Installed the VR plug in the IA opposing valve.
e
e
WELL LOG
TRANSMITTAL
PRoAcrivE DiAGNOSnC SERvicES, INC.
To: AOGCC.
Attn: Ceresa Tolley
333 West 7th Avenue
Suite 1 00
Anchorage, Alaska 99501-3539
RE : Cased Hole/Open Hole/Mechanical Logs and/ or Tubing Inspection[Caliper / MTTJ
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this transmittal letter to :
ProActive Diagnositc Services, Inc.
Attn: Robert A. Richey
130 West International Airport Road
Suite C
Anchorage, AK 99518
Fax: (907) 245 - 8952
;lOJ- 1')1 1J 1C-119 MTT Report 16-May-06
2J 1 C - 121 MTT Report 16-May-06
3J 1C-131 MTT Report 14-Jun-06
4J 10 - 127 MTT Repcrt 14-Jun-06
5J 10 - 121 MTT Report 14-Jun-06
6J 1 0 - 1 09 MTT Report 1 5-Jun-06
7J 1 0 - 1 20 MTT Report 15-Jun-06
8J 10-111 MTT Report 15-Jun-06
Signed: ~ òiJJ
Print Name: µ D \.J..) ~ I/' ¿,..~ Okl(lk¿
';.,-~,
';.I ,.;.
Date: ? I J u ~ ~ IN.\ ~
PRoACTivE DiAGNOSTic SERviCES, INc., J}O W. INTERNATioNAl AiRpoRT Rd SuiTE C, ANCHORAGE, AK 99 ~ 18
PliONE: (907)24~-89~ J FAX: (907)24~-89~2 E-MAil: Dds'\í\JCHORi\qE@I\<1EMORvlo(j.COM
WEbsiTE: MEMORyloG.cOM
C:\My Documents\ W ork\ DistributionLablesNew\ Transmît_ Original. doc
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
e
e
Memory Magnetic Thickness Tool
Log Results Summary
Vi
\' \ ~~
;}C
Company: ConocoPhillips Alaska, Inc. Well: 1C-119
Log Date: May 16, 2006 Field: Kuparuk
Log No. : 8023 State: Alaska
Run No.: 2 API No.: 50-029-23034-00
Pipe1 Desc.: 3.5" 9.2 Ib EUE Top Log Intvl.: Surface
Pipe1 Use: Tubing Bot. Log InM.: 193 Ft. (MD)
Pipe2 Desc.: 5.5" 15.5 Ib BTC-M Top Log Intvl.: Surface
Pipe2 Use: Production Casing Bot. Log InM.: 193 Ft. (MD)
Pipe3 Desc.: 16" 62.6 lb. H-40 Top Log InM.: Surface
Pipe3 Use: Conductor Pipe Bot. Log Intvl.: 117 Ft. (MD)
Inspection Type: Assess External Corrosive Damage (Metal Loss) to Production Casing.
COMMENTS:
This MTT data is tied into the Tubing Hanger @ 0' Depth.
This is the first log of this well with the 12 Arm Magnetic Thickness Tool (MTT). The Magnetic Thickness
Tool responds to the total thickness of metal of the 3.5" tubing and 5.5" production casing, with some
influence from the 16" conductor pipe.
Due to the concentric pipe strings in the log interval, the MTT response is qualitative - indicating an overall
increase or decrease in metal surrounding the tool, but not distinguishing in which pipe string the change in
metal thickness occurs. In this log, the MTT was calibrated down hole (100'), where the readings are
assumed to represent undamaged tubing, casing and conductor pipe. All other readings are relative to this
reference point, which include influences from the 3.5"" tubing, 5.5" casing, and 16" conductor pipe.
INTERPRETATION OF MTTLOG RESULTS:
The MTT log results cover the interval 0' - 193'. A log plot of the entire log interval, plus detailed sections of
intervals showing damage are included in this report. The Delta Metal Loss (%) curve in these plots refers to
total metal surrounding the MTT tool and the results show four intervals of metal loss.
A maximum of (8%) circumferencial metal loss is recorded in the interval between 17' and 26'.
A maximum of (10%) circumferencial metal loss is recorded in the interval between 52' and 57', with an
isolated event showing as much as 17% metal loss over a small area.
A maximum of (9%) circumferencial metal loss is recorded in the interval between 71' and 77', and two areas
of isolated metal loss are recorded just below this interval (77' & 79').
A significant (-15%) isolated metal loss feature is recorded below the conductor pipe (148').
The percent circumferencial metal loss expressed in this summary is a percentage of the total metal that the
tool is responding to, which includes influences from the 3.5",5.5" and 16" pipe. If all of the metal loss is
specific to the 5.5" production casing, the percent metal loss from that pipe alone is probably higher than the
numbers expressed. Some of the metal loss indicated could be from either the 3.5" tubing or 16" conductor.
I Field Engineer: R. Richey & G. Chipman
Analyst: M. Tahtouh & J. Burton
Witness: T. Sendon I
ProActive Diagnostic Services, Inc J P.O. Box 1369, Stafford, TX 77497
Phone: (281) or (888) 565-9085 Fax: (281) 565-1369 E-mail: PDS@memorylog.com
Prudhoe Bay Field Office Phone: (907) 659-2307 Fax: (907) 659-2314
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
cIas- I\JI '-~ 'I-' .1 .....
'>:1 It:HIv IlIvl'\llt:~~ r·ð~~
"""""""'JivE DiAq""""..c SERVic"", ¡NC.
Database File d\warrior\data\1c-119\1c119.db
Dataset Pathname .- A.. ....^'. 1
I Li-! I;::II! UI I
Presentation Format
Dataset Creation: Thu 1808:50:042006 Calc Sondex Warrior V7. 0
Charted in Feet scaled 1 :150
I Thickness (%) ~ 2.5 MTTP01 (rad) 12.5
0 Line Speed (ft/min) -200 -6.3 MTTP12 (rad) 3.7
~ TREE
r3.!: "Colla
I
±J ~I
-- 3.5" ---j 11 1
Jt 1 -j:
./ )
20 IJ =
8% Metal Loss- -
-
¡';;,
"\ ¡sl ,
;~. -
FRF
-
I--
3.5" Collar ~
~I I Pup Jt. 1. 1
-35" 40
3.5"
Pup Jt. 1.2
~
- 3.5" Collar
10+% Metal Loss
t = 60
3.5"
Jt. 2
< , L
I--
9% Metal Loss_
I I
I 80
.-
3.5" Collar - 1>---
I
"Casi Collar
IJ I
W" , " .7' ft IF !
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I ~ I I I r~; I ~ I I.!:
I < I I I~' I
~ ti
100
f
{
~3. 5" Colla
} 16" Conductor
! 120
5.5" Cm>ln9 Collar
3.5"
Ji. 4
-
tt f--
¡ I 140
+-35" Colla
Isolated Metal ~os~ Feature
~ '--
3.5"
Jt. 5 ~¡
160
!--
\ .5" l.,as!n~ Collar I--
( ¡::
!--
¡ 5" C;;lIar 180
f "'1
'-.. I ;:c
? 3.5"
L Jt. 6
3 J
" I
-50 Delta Metal Thickness (%) ~~. 2.5 MTTP01 (rad) 12.5
0 Line Speed (ftlmin) -200 -6.3 MTTP12 (rad) 3.7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
clrk n.i. :1 IU_,,_ I n~~ r". .I.JfA 1 -
..-......-.. ___. - I -
PROAcri_ DiAq""""Y¡c 51"...,;.,13, ¡..c.
Database File: d\warrior\data\1c-119\1c119.db
Dataset Pathname 'UN ",,'. , 'vII U! II 1-""<>" I v.1
Presentation Format Ohz
Dataset Creation Thu 1808:50:042006 Calc Sondex Warrior VT 0
Charted in Feet scaled 125
-50 Delta Metal Thickness (%) 50 2.5 MTTP01 (rad) 12.51
0 Line Speed (ft/mìn) -200 -6.3 MTTP12 (rad) 3.7
1"+ ~J J . ¡
:
? ì
<
16 (
I 18 I I
I 5 ~ I / ì j
I I
) >
J
:> (
1 I ! I
20
~ : < " 1\
~.. 8% Metal Loss !
') :> «~ ) :>
, J ( I' <
22 !
) ~ ,
~ !
(\.;, f \ (
<
i~ < ~>
24
~ ~
(
1
26 <
~> ~'>
> <
{
( :>
( < ~
;>
28 <;
~
, )
> II ;;
-50 Delta Metal Thickness (%) 50 2.5 MTTP01 (rad) 12.5
0 Line 8f-'C<;;\.J (~~¡ I II! I) -200 -6.3 M I I I-'l¿ (rad) 3.7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
cIas. n * ., U ,,£01 I ass ¡- L
,,, .........., ¡ -
................
p~"" DiN:¡"""""", S"'''''¡CE!i, ¡....,.
Database File: d\warrior\data\1c-119\1c119.db
Dataset Pathname -r "oJ""' ¡~I!UIII 0.1
Presentation Format:
Dataset Creation Thu 1808:50:042006 Calc Sondex Warrior VI. 0
Charted in Feet scaled 120
-50 Delta Metal (%) 50 2.5 MTTP01 (rad) 12.5
0 Line Speed (ft/min) -200 -6.3 MTTP12 (rad) 3.7
............................
;:;
48 1'"- '--
"".c F> >:
( .:: I:>
z~ F ¿ ;:
< ~:::.
- f--
f--
LL 50 (,
II 1./// c.> // / II / :
/' ~ ( ( (
l
( I~ L. h h
-+c:Þt -, '"
3.5" Collar
Area of General 1 0% Loss 1 ( ]> { / ¡
( ,
:
~~ m~ I lí ( \
54 ~ -> <
IF'E ~Rr Isolate, þFeature .J \ ( { ¿:
~ ........ « .~:;:
"'1" (
( ¡
. D \
AlII" it [?
....£1
Isolaf þd , y,..",.", '-' ~ >" ~ è
I I I ( ~ ~ ;, !\
Area of Metal Loss < 1,
\ { "\ ~
< (
í
58 (
I
":::::: ì <
í <
~ )-
\
-50 Delta Metal (%) 50 2.5 MTTP01 (rad) 12.5
0 Line Speed mfmin) -200 -6.3 MTTP12 (rad) 3.7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
cIas. n ' ., I'í" · 'I n~~ FA.At'jrp. 71'-
IQT:;¡¡II
-....~-,. -. ....
p~ DÎAi:¡......iè !!Ii"..wi""", I..c.
Database File d:\warrior\data\1c-119\1c119.db
Dataset Pathname WI 'n::!rI .,.110.;-119/1 10.1
Presentation Format mtt 10hz
Dataset Creation: Thu 1808:50:042006 Calc Sondex Warrior V7. 0
Charted in Feet scaled 125
-50 Delta Metal , ~ 2.5 MTTP01 (rad) 12.5
0 Line Speed \~t", m,} -6.3 MTTP12 (rad) 3.7
J J f> > [ ) 1-1 ~
70 ~
J /' ) J l/ I ./ i/ /
II I; J
J
72
f) )
,+ - 9% Metal Loss < :>
<'ii< Þ
74 (. <
<: \
:>
< ¡
(
tl ~ ) ~ \, \ )
76 < Î: .~ <',
je, n.::>' Isolated Feature , > \ 1
-
1\ \ ì
J ,
,
78 <:
(> ,) L ('< " < <,
I- ue eper Feature ~ < ~ <: ') (
j~ <
) <) 0"
<: < (~ (
80 { <.
(> <; > .:::i>
"""" ¡
l ~ -= I· :::;
~) ~~ ¿ iC;· "", ~. -~
/ ~
) D j:) )
j .// //
82 ./ /
I ( (
<'Ii ¡
3.5" Collar- ~
84 ( Ir' I J (
= I ¡ I I
-50 Delta Metal Thickness (%) 50 2.5 MTTP01 (rad) 12.5
:0 L '"' N".~' -200 -6.3 MTTP12 (rad) 3.7
Ine ;:,peeo (1l1111111)
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~I"" DW:¡_lc SEa";.,,,,,- INC.
1
Database File: d\warrior\data\1c-119\1c119.db
Dataset Pathname 1
Presentation Format
Dataset Creation: Calc Sondex Warrior V7.0
Charted
-3.5" Colla 146
148
Isolated Metal Loss Feature
150
I -50
o
Line
I
I
2.5
-6.3
12.5
3.7
MTTP01
MTTP12
2.5
-6.3
12.5
3.7
MTTP01
MTTP12
I
1
19
I
I
TUBING -~--
(0-5785,
00:3,500,
10:2,992)
'ROOUCllON -~
(0-5799,
00:5,500,
Wt:15,50)
, API: 500292303400
SSSV Type: NONE
Annular Fluid:
._"~~-
I
I NIP
(5746-5747,
00:4,520)
NIP ,----
I (5785-5788,
00:4,500)
SBE~
(5787 -5788,
00:5,000)
I SEAL
(5788-5789,
00:4,000)
I ID
2.812
3.000
4.000
3.000
I SHOE - 4.950
(5798-5799,
00:5,500) 3.500
0.000
2.992
I XO
(5799-5800,
00:5,000)
I
'ROOCUTION
I (5799-6594,
00:3,500,
Wt:9.30)
Perf
(5986-6002)
I
I Perf
(5002-6022)
I
Perf
I (5054-6072)
I Perf
(5072-6092)
I
I _.~-~~--
Lr vvu. vVJJUI."U.l JJl1l1p~ LA""a VUUVl1 or.. .l'\.""PUU .1 1 UJ'-''-'L J
.~
'-"
Subject: [Fwd: ConocoPhillips Excavation & Repair Project]
From: Thomas Maunder <tom _ maunder@admin.state.ak.us>
Date: Tue, 20 Jun 2006 07:00:24 -0800
To: Lou Grimaldi <Iou _grimaldi@admin.state.ak.us>, John Spaulding
<john~spaulding@admin.state.ak.us>, John Crisp<john_crisp@adInin.state.ak.us>, Jeff Jones
;<jeff---Ïones@admin.state.ak.us>, Chuck Scheve <chuck _ scheve@admin.state.ak.us>, Jim Regg
<jim_regg@admin.state.ak.us>
All,
Enclosed, FYI and scheduling, is a message from Problem Wells regarding the "big dig"
project they will be starting soon. Jerry has also included a copy of the SPE paper
he/they prepared regarding causes and repairs.
Tom
\~-\\,\
dCJ \ - \ S <7
-------- Original Message --------
ConocoPhillips Excavation & Repair Project
Mon, 19 Jun 2006 14:06:18 -0800
NSK Well Integrity proj <NI878@conocophillips.com>
tom maunder@admin.state.ak.us
N-SKWeTI-integri ty -·Proj <NIB 78@conocophillips. com> ,
aogcc prudhoe bay@admin.state.ak.us
Subject:
Date:
From:
To:
CC:
SCANNED JUN 2 7 2006
Tom:
I don't remember how much of our plans we have shared with you on excavating and
repairing wells at lC & ID pads. We have been submitting a lot of 10-403s for the work
and there is a reason for that. Starting in the next two weeks we will focus on this
project, which is pretty ambitious. The attached spreadsheet lists the wells we intend
to excavate. Some of these were determined this last year to have surface casing leaks.
Others we have chosen to I'pro-actively" excavate and inspect to get a better
understanding of the level of damage to be expected for the other single casing wells.
At any point in time we will have two wells in progress, and hope to continue for the
bulk of the summer. A couple of them we will intentionally target late in the year when
the ground has less water encroachment problems.
We have submitted Sundry requests for all but one well, three of which are in the mail
to you today. Like the others, we expect that you agree inspections and repairs on
these wells are important and will approve those as well. As we go through the project
we will keep the Inspectors notified of our progress so they can see these casings
exposed. However, we will be under a tight timeline and will not hold excavations open
longer than is necessary. Hopefully they can arrange to inspect them in the several day
period that each of them is exposed.
If you have any questions about our project please let us know. The SPE paper we wrote
on the subject is a good primer on the mechanism involved. I have attached a copy in
case there is interest in your shop. Talk to you soon. «IC and ID Casing Repair List
AOGCC.xls» «SPE-I00432-PP SC Corrosion West Region 2006 Final.doc»
Jerry Dethlefs
Problem Well Supervisor
ConocoPhillips Alaska
907-659-7043
u. n no _ _u_._______
· Content-Type: application/vnd.ms-excel
1 C and ID Casing Repair List AOGCC.xls
. Content-Encoding: base64
SPE-I00432-PP SC Corrosion West Region 2006 Final.doc Content-Type:
application/msword
10f2
6/26/20067:51 AM
PRIORITY
1
2
3
4
) 5
6
7
~~\-\"1~
8
9
10
11
12
13
14
15
16
-,
)
NAME
. - .. -..--..--..--.------.-
1 C-121
1 C-131
1 0-109
1 0-111
1 0-120
,"b..._._ _-,-_._ ......,_~_. ..____ ........_.._
·..1.()~121 ... . .
IZ~~I&f=:
: 1 0-132 :
i._..__._.._.. .__.___......_.__....__......._._____....___.___.. _.._..
1 0-136
. .~.·,___...,....._..w._.....~..._._........_____.~...~.".~.~n' ....n..
10-137
1 0-138
1 D-139
~ 1C-119
,. '. 1iC-13S ............. . .i
- .. . t".._u ·~·-_·:~~·-·..,···,..:·,··'-·~'-:··"·,-'~···..·"..·....1
1P..1ª~ '. .... I
t-··,,·..·..·--~",..,···_-~,···-··-7~,...- -" .......:...:--.,
1D':141' i
ConocoPhillips Alaska, Inc.
1 C and 1 D Suñace Casing Corrosion Repair Candidates
TYPE PTD# LEAK DEPTH (ft)
---_...._-_._._..__.~.. .__.. --.. --.---- -- --_._-~_.,~-~.__.._-
INJ 201-080 4
INJ 201-185 7
---- -.",'-"'..--
INJ 197 -235 5*
INJ 198-166 5*
INJ 197-221 7
.-
Gas Lift 197-181 None
Gas Lift 198-109 None
INJ 198-121 5
INJ 200-046 None
- - -. --
INJ 200-047 None
INJ 200-048 8
--
INJ 200-049 None
INJ 201-139 16
- -
Jet Pump 201-220 None
ESP 197-184 None
Gas Lift 200-112 None
COMMENTS I STATUS
- _U' _ _. ..."'.. u_.. _
Proactive dig
Proactive dig
Proactive dig
. -- _._-~---_.._.._-_._._._-_.- -.
Proactive dig
- --.---.--.---. --~--
Proactive dig
Proactive dig
Proactive dig, backup candidate (has 500' casing)
- ----.- - -
Proactive dig backup candidate.
Notes:
1. Repairs will.be performed in the priority order as listed, two repairs in progress simultaneously.
2.10-135 and 10-141 are backup options in case excavations cannot be made on other wells.
3. List is a combination of wells with known leaks (8) and proactive inspections (2 injectors and 3 producers).
4. Proactive inspections are scheduled for wells that are currently shut-in and should not have rate impacts except 1 C-135 Jet Pump producer.
5. Rate impacts may be encountered if neighboring wells are shut-in during excavator activities or if additional flowlines need removal.
6. If excavations cannot be completed prior to rig arrival then SIMOPS operations will be considered or delays will be encountered.
NSK Problem Well Supervisor
6/26/2006
e
e
.: ? U D Lì .~_ -=.:: :
'hj") _() \ -
OPER & FIELD
dtJ l-\ ~ <-)
C\>~ ~@~~So.~.
\c...-\\C\
HECR..A...NICAL INTEGRITY REPORT' ___
:. ~ G 2 E ;... .:: ;_ :: ~ :
<C:S-/lS;-C -L- Í'ê~LL NTMBER
'Cit:LL DATÞ. TD: ~bC<O Jill. ,-\'J-'l) TVD; ?ETD: bl1~1) MD ~,'\D TVD
Cê.S Ù'6: 5l{"'J. Shoe: 5"'\'ì'1 till TVD j DV: MD ,TVD
~~\X!~. ~<:.
___Ie:.. ~l/L. Shoe: G>S<;~MD Tift; :C.?: ..JI-1)t·m :T0
- '-J 0"--:; g : 5 'l-:J. P ac?~~ till TVI); Set ê. t:
'"' ""I(;L\\ .'~ c:-¡ .- -L 0 l """ C' d.-
~ole Size \ 0 anå Perfs .~~~ ~~ 1
-\-~ \"'~~~ \ ',~
:'SC?.Þ..NIC'...L INTEGRITY - ? .A.RT 11
Annulus Press Test: ~p
15 min
3 0 m~n
Cow:oents:
'\-\\\\~~~ ~-l~-()c
,..-
\ .5~~'1-\ '-\5\ \O~\~\
~4S-~~ <.. S~ b \)\c;.)
Csg . ; DV .
~CB~~IC~~ INTEGRITY - PMZT /2
Ce!J1enc Volumes:' ,AIDt. Liner
CiTIe -,¡ol to cove-r Der=s ,è)7'D b\:)\~ o\. c..1l..~~\ 'S'..J'~'Œ.'¡~~ ~£-
7:>\/)
c.Q..""""'" ~5 ~ \;J \-.a. ~ (¡c c'ì. "-~ \c.. ~J
'l"heorecical TOC
Cement Bond Log (Yes or No)'''iE-'5> In AOGCC File ''i<t~
v
CEL ~valuation, zone ¿Dove perfs ~~ S<::û~ ,-(,\1'4:,,6 5'1~éJ ..
Pro¿u~tion Log: Type
Evaluation
?ar:: fZ:
,
\-A,"S;:' ~C<'> ~"""""- k~ ..
\J\...L "' ~ 't ~t"Ctl ~Ç)
. .... . ~ ¿f2 ~ ~/>i)-O(;,
CONCLUSIOt-1S:
? ar e t 1 :
AI,ASIiA ORAND GAS
CONSERVATION COMMISSION
e
FRANK H. MURKOWSKI, GOVERNOR
MJ Loveland
Problem Wells Supervisor
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510-0360
333 W, 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: Kuparuk River Field, West Sak Oil Pool, 1 C-119
Sundry Number: 306-095
Dear Mr. Loveland:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
DATED this~ day of March, 2006
Encl.
ór:rS ~;;¡ RECEIVED
· STATE OF ALASKA Ábû MAR 2 0 2006
ALASKA Oil AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROV A~Jaska Oil & Gas Cons. Commission
20 MC 25.280 Anchorage
o Suspend 0 Operational Shutdown 0 Perforate 0 Waiver 0 Other 0
o Repair well 0 Plug Perforations 0 Stimulate 0 Time Extension 0
o Pull Tubing 0 Perforate New Pool 0 Re-enter Suspended Well 0
5. Permit to Drill Number:
201-139 V
6. API Number:
50-029-23034-00
9. Well Name and Number:
1 C-119
1, Type of Request:
Abandon
Alter casing
Change approved program
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360, Anchorage, Alaska 99510
7. KB Elevation (ft):
RKB 102'
4, Current Well Class:
Development 0
Stratigraphic 0
Exploratory 0
Service 0
10, Field/Pool(s):
Kuparuk River Field / West Sak Oil Pool
PRESENT WELL CONDITION SUMMARY
Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured):
8. Property Designation:
Kuparuk River Unit
11.
Total depth MD (ft): Total Depth TVD (ft):
6606' 4272'
Casing Length
Junk (measured):
CONDUCTOR
158'
5697'
qSI
Size MD TVD Burst Collapse
16" 158' 158
5-1/2" 5799' 3539
-, --' \1 I.{;>' .
Tubing Size:
3698 3-1/2"
Packers and SSSV MD (ft)
Perforation Depth MD (ft):
5986
Packers and SSSV Type:
no packer
no SSSV
12, Attachments: Description Summary of Proposal 0
Detailed Operations Program 0 BOP Sketch 0
14, Estimated Date for
Commencing Operations:
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name MJ Loveland
~
Perforation Depth TVD (ft):
Date:
no SSSV
13, Well Class after proposed work:
Exploratory 0 Development 0
15. Well Status after proposed work:
Oil 0 Gas 0
WAG 0 GINJ 0
Contact:
Title:
Signature
~
Phone 659-7224
Commission Use Only
Conditions of approval: Notify Commission so that a representative may witness
Plug Integrity 0 BOP Test 0
Mechanical Integrity Test 0
Location Clearance 0
Other: C.O~~ClC \- r~\,<èc..\o\-~'-- C~ <'-~ ~\~S '> 't_~\-
Tubing Grade:
L-80
Tubing MD (ft):
5785'
Service 0
Plugged 0
WINJ 0
Abandoned 0
WDSPL 0
MJLoveland / Marie McConnell
Problem Well Supervisor
5
Approved by:
e
e
ConocoPhillips Alaska, Inc.
Kuparuk Well1C-119 (PTD 201-139)
SUNDRY NOTICE 10-403 APPROVAL REQUEST
February 27,2006
This application for Sundry approval for Kuparuk well 1 C-II9 is for the repair of a production
casing leak:. This well is a single casing injector; it has no surface casing. It was completed in
April 2002. On August 02,2005, the well failed an MITIA. A leak rate of 0.25 bpm was
established and the leak: depth has been estimated at 16.6' corresponding to the top of cement in
the conductor.
Since the mode of failure is suspected to be the same as other wells with similar construction, it
is requested to inspect and repair the production casing near surface on this well.
With approval, repair of the production casing will require the following general steps:
1. Notify AOGCC Field Inspector of repair operation so they may witness the event.
2. Safe-out the well with plugs and load the tubing and IA with seawater and diesel freeze
protection cap.
3. Remove the floor grate and equipment from around the wellhead.
4. Install nitrogen purge equipment for the IA and conductor so that hot work may be conducted
in a safe manner.
5. Cut away the conductor casing and remove cement around surface casing for inspection.
Approximately the top twenty feet of conductor will be removed to provide access to the
production casing.
6. CP AI Mechanical Engineers will determine appropriate patch and/or repair to return the
casing to operational integrity.
7. QAlQC the repair and MIT-IA for a final integrity check.
8. Install anti-corrosion coating as specified by CP AI Corrosion Engineer.
9. Replace the conductor and fill the void with cement and top offwith sealant.
10. Backfill as needed with gravel around the wellhead.
11. Remove plugs and return the well to production.
12. File 10-404 with the AOGCC post repair.
NSK Problem Well Supervisor
05/07/05
TU91t-iG
(0-5785.
00 3 500,
102992)
SURFACE·
Monobo:e
(0·5799,
00'5,500,
Wt.1550)
~IP
(5746-5747,
00 4 520)
N!P
(5ìf.';-5788,
OD 4 500)
S3E
(5787·5788
OD 5 OOG)
SEAL
(5188-5789.
OD,4,OJO)
SHOE
í51£<8-57S>.3.
CJ.5.500)
Perf
(5986-6002)
Perf
(6002-6022)
Perf
(6054-6072)
Perf
(6072-6092)
.
WEATHERFORD FLOAT SHOE FOR 3 5" CASING
Description
CAMCO 'DS' NIPPLE WINO GO PROFILE
BAKER NO GO SUB w/4" BAKER DEBRIS SEAL SUB
BAKER 12' SBE
BAKER 80-40 GBH-22 SEAL ASSEMBL Y
MULE SHOE FOR 315" MONOBORE TUBING
ID
2,812
3000
4000
3,000
4950
3500
2992
Man
!ïe!
KBG-2-9
- JEWELRY
DMY
o
DK-1
0,000
o
Date
Run
8/16/200
Zone
WSD
WSB
V Mfr
V Type
f!
~
38
SPF Date
4 4/15/2002
4 411512002
V OD I latch
!ïe! Comment
IPERF 2,5" HSD HB Guns
IPERF 2,5" HSD HB Guns
Port
TRO
Vlv
Cmnt
Status
Bottom
5785
6460
411412002
All STRING~
Size
16,000
5500
3,500
To
o
o
5799
TVD
3527
Bottom
156
5799
6594
Wt
930
Grade
L-80
TVD
158
3539
4260
Wt
62,50
15,50
9,30
Thread
EUE8RD
Grade
H-40
L-80
L-80
Thread
WELDED
BTC-M
EUE8RD
R
API' 500292303400
SSSV Type: NONE
Max Hol
2429
ImO
e
.PHlllIPS Alaska, Inc.
~ A Subsidiary of PHILLIPS PETROLEUM COMPANY
:¡c::¡:¡¡
Well
e
KRU
1 C-119
20 ¡ - ¡ Failed MITIA
19
-1
an
is as
to
is in
is a
a
1 19
3000
2500
2000
1500
1000
500
o
Date
C-! !
FaiIed MITrA
201-
in a
11
e
e
MICROFilMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _lnserts\Microfilm _ Marker.doc
Schlumberger
NO. 3313
Schlumberger -DCS
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
1/19/05
~- ~-.~.._ €þc~_
~ (}Jff- ?~~~ ?;<--~ 7
<'I F. ?nf11:.
fi.N- í\.'Er\ p\ Pq ¡ 1'\ ~U J,j
sen, J'j _ .k' . ~ 1 ¿, \d
Company: Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Well Job# Log Description Date BL
{'fo- /&:,7 1A-25 10942816 PRODUCTION PROFILE/DEFT 12/25104 1
1ge...~D-10 10942818 LDL & MUL TIFINGER CALIPER 12/27/04 1
2B'I-ðfr 1E-112 10715441 MPSP PRODUCTION PROFILE 11/12/04 1
JOI"'/~ 1C-119 10942819 INJECTION PROFILE 12/28/04 1
;ü,¿f'...tt ~ 1 E-1 04 10942821 PERF RECORD W/SBHP 12/30104 1
/8h- /2. ~ 2T -12A 10922519 PRODUCTION PROFILE/DEFT 01/03/05 1
104"Z2.1.1E-104 10942821 SCMT 12/29/04
2-D 1{..1.' ( 1 E-1 02 10942815 USIT 12/24/04
SIGNED:
DATE:
Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you.
Kuparuk
-..-i
Color CD
1
1
-~
1-(1- 05
/ Ç" r-'l. ~/ A (j i.. ,-I
DATA SUBMITTAL COMPLIANCE REPORT
412912004
Permit to Drill 2011390
Well Name/No. KUPARUK RIV U WSAK 1C-119
Operator CONOCOPHILLlPS ALASKA INC
MD 6606
1VD 4272 -
Completion Date 4/15/2002 ./-
Completion Status 1 WINJ
Current Status WAGIN
-- --------
.--- --- ----
- . -. - - .---
".. -
------- ---- -----------
-- -----------
REQUIRED INFORMATION
.~ vJ ;7 Ii ~'1 ,{(; () I
API No. 50-02~3D~.4-00-00
C:c y)
-- - -- .
Mud Log No
Samples No
Directional Survey No
-------- - -- -- - ---.
------ -- - ---- -
------
-- --- ----- -.
----
DATA INFORMATION
Types Electric or Other Logs Run:
(data taken from Logs Portion of Master Well Data Maint)
Well Log Information:
LogI Electr
Data Digital Dataset Log Log Run
Type MedlFrmt Number Name Scale Media No
,':L09 ---- ------- ----
I nductionlResistivity 25 Blu 1
~ I nductionlResistivity 25 Blu
cLog Spinner 5 Blu
J
~g Pressure 5 Blu
~.Log Casing collar locator BS
~~ Temperature 5 Bfu
..-Log Temperature BS
r'Cog Injection Profile 5 Blu
...:)fog Pressure Blu
Log Pressure BS
...1
...; Rpt LIS Verification
I Log Spinner BS
!
¡Log Gamma Ray BS
~- C L..-r1217 LIS Verification
I
¡ .~og I njection Profile 5 Blu
I
I
:-t:Og Pressure 5 Blu
I
+tog Temperature 5 Blu
~
: Log Spinner 5 Blu
Interval OHI
Start Stop CH Received
158 6606 Open 10/18/2002
158 6606 Open 1 0/18/2002
5695 6150 Case 10/1/2002
5695 6150 Case 1 0/1/2002
100 3900 Case 5/17/2002
5695 6150 Case 10/1/2002
100 3900 Case 5/17/2002
5695 6150 Case 10/1/2002
5800 6130 Case 1/10/2003
100 3900 Case 5/17/2002
158 6606 Open 10/18/2002
100 3900 Case 5/17/2002
100 3900 Case 5/17/2002
158 6606 Open 10/18/2002
5745 6270 Case 12/12/2003
5745 6270 Case 12/12/2003
5745 6270 Case 12/12/2003
5745 6270 Case 12/12/2003
Comments
--- -----
--- ----- --
Injection Profile -
Press/Temp/Spinners
Injection Profile -
Press/Temp/Spinners
Injection Profile -
Press/Temp/Spinners
Injection Profile -
PressfTemp/Spinners
--- -----------
---------
------------ ---._---------- ----- --".-
------ --------
DATA SUBMITTAL COMPLIANCE REPORT
4/29/2004
Permit to Drill 2011390
Well Name/No. KUPARUK RIV U WSAK 1C-119
Operator CONOCOPHILLlPS ALASKA INC
API No. 50-029-23034-00-00
MD 6606
TVD 4272
Completion Date 4/15/2002
Completion Status 1 WINJ
Current Status WAGIN
UIC V
Well Cores/Samples Information:
Name
Interval
Start Stop
Sent
Received
Sample
Set
Number Comments
Well Cored?
ADDITIONAL INFORMATION
V@)
Daily History Received?
@N
(Î)N
Chips Received? < v / N ~
Formation Tops
Analysis
Received?
~.
----------------
-----
------
-------
-------- ---- -
Comments:
~:mPlia~ce Rev~e~edBY: ~ --~~- . u - -----=- ~-
Date:
, - M.--=-:-_~-~~~~~
-!-1--flIb, - H- '--- ~
-
Change Approved Program
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360
7. KB Elevation (ft):
RKB 102'
1. Operations Performed:
Abandon
Alter Casing
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
0 Suspend 0 Opera1ion Shutdown 0 'perlorate 0
0 Repair Welf 0 Plug Perforations 0' Stimulate 0
0 Pull Tubing' 0 Perforate New Pool. .0
. 4. Current Well Status:
Developmeflt 0
Stratigraphic D
Other 0
j,J:J¡eJJ ~ 0114
Variance D Annular Disp. 0
Time Extension 0 '
Re-enter Suspended Well 0
5. Permit to Drill Number:
201-139/
6. API Number:
50-029-23034-00
Exploratory D
. Service 0
9. Well Name and Number:
1 C-119
8. Property Designation:
Kuparuk River Unit
11. Present Well Condition Summary:
10. FieldlPool(s):
West Sak Oil Pool
Total Depth
Effective Depth
Casing
Structural
CONDUCTOR
SURFACE- MON-
SURFACE
Perforation depth:
measured 6606' feet
true vertical 4272' feet
measured 6498 feet
true vertical 4170 feet
Length Size MD
158' 16" 158'
5697' 5-1/2" 5799'
795' 3-1/2" 6594'
Plugs (measured)
Junk (measured)
TVD
Burst
Collapse
158'
3539'
4260'
Measured depth: 5986-6022: 6054-6092
RECEIVECti
MAH 1 2 2004
Alaska on & Gas Cons. Gommi3;;iofl
Anchorage
true vertical depth: 3698-3729; 3757-3791
Tubing (size, grade, and measured depth) 3-1/2" , L-80, 5785' MD.
Packers & SSSV (type & measured depth)
no packer
no SSSV no SSSV
'12. Stim'ulation or ~ame,nt squeeze ,summa,ry:'
,Intervals treated, (meastired) N/A
, Treatm'ent'descriptions including volumes used and firial pressure:
Prior to well operation'
, Subsequent to operation 126
.14. AtlÇichments' ' 15. Well Class after proposed work:
Copies of Logs arid ~urveys run - Exploratory 0 Development 0 , Service 0
Daily Report of Well Qperations _X 16. Well Status after proposed work:
, ouD GasD WAG0 GINJD WINJ 0
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A If C.O. Exempt:
" ,13. ," '
Oil-Bbl
Representative Daily Average Production or Injection Data
, . 'Gas-Met. Water-Bbl. .
1594
. Tubinq Pressure
1107
2430
. C~sinq Pressure
450
150
WDSPL 0
Contact fIjf¿' Jeff Spencer@659-7226
Printe,d Nam eli' - h~,istens n
Signatur
--A A
~4i1 ~~ tiS fJFL
Form 1 0-404 ReVis~~~ .
Producti,on Engineering T ech\lician . /
6.59-7.53!¡ Date 3/Iðj'o'f'
. 1 5 ?O~~, I::! ',,': ,.1'\ j
,:..--" ~ " I: 'J,,:.' J' ~' ,~I. i L
Title,
Phone
SUBMIT IN DUPLICATE
1 C-119
DESCRIPTION OF WORK COMPLETED
SUMMARY
Date
Event Summary
02l27/04lCommenced WAG EOR Injection
12/08/03
Schlumberger
NO. 3057
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Well
3B-01
1 L-09
1 C-119
1 C-121
g.cO" Œ,\ 1 D-11 OA
X;O- J 4 Ü 1 D-140L 1
2P-432
1.C~-d1 \ 2P-432
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Kuparuk
.-
Job#
BL
Color
CD
Log Description
Date
\ $jf5-C;.5( (: INJECTION PROFILE
}90- (')~L LEAK DETECTION LOG
f,l,Ci{ .. 13D INJECTION PROFILE
l}.C, I-([',)if) INJECTION PROFILE .-
10709648 US IT - 0\A ~,---, (,-~ U
10709639 USIT '\
~~'r:=t l SLIM SONIC LOGGING TOOL
10687658 US IT
~"L~ <:.'--'~~\ '\ -C7- -(. ~
11/24/03
11/26/03
11/27/03
11/30103
10/31/03
10/22/03
11/21/03
11/16/03
1
1
1
1
D~rr::fVED
~ ".. i..-.. V i-. I
. --,
SIGNED: .~-,(:\<.. \.\..:.'-'~~-,.,'. '- (. (~~" e "\
DATE:
DEC 1 2 2003
AlasKa Úil 0 Gas vons. vùlllmJS!lf~n
Anchor~e
Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you.
-~~~ \'\ '- ~
Schlumberger
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TTN: Beth
Well
Job#
Log Description
Date
1 C-119
3S-09
2K-13
aOI- 13q
riQ;)-~~
I "XC¡ - 09'5
04/15102
12125/02
12/19/02
PRESS/TEMP LOG
SBHP/T (POST PERF)
INJECTION PROFILE
5IGNED~. (, OOor~
DATE:
12/31/02
NO. 2635
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Kuparuk
~
BL
Sepia
CD
Color
1
1
1
REGE\VED
JAN 1 0 'OO~
Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you.
Ala~8 0;', & Ga5 GonS. c<;mrnl~
AnC'hQ{fI<Je
~ PHilLIPS Alaska, Inc.
m, A Subsidiary of PHILLIPS PETROLEUM COMPANY
Post Office Box 100360
Anchorage, Alaska 99510-0360
R. Thomas
Phone (907)265-6830
Fax: (907) 265-6224
l\1ay 2. 2002
Comtnissioner Camtny Oechsli Taylor
State of Alaska
Alaska Oil & Gas Conservation Commission
333 \Vest th Avenue Suite 100
Anchorage. Alaska 99501
Subject: COInpletion Report for 1 C-119 (201-139)
Dear Commissioner:
Phillips Alaska, Inc. submits the attached Completion Report for the drilling operations on the West
Sak welllC-119.
If you ha\'e any questions regarding this matter, please contact Steve J\tIcKeever at 265-6826.
Sincerely.
. :-~ ~~~
R. Thomas
Kuparuk Drilling Team leader
PAl Drilling
RT/skad
RECf!\/ED
~ I ".,' :'1 ?OO2'
' :"-~, " '.." -; L ..
Alas!<a (}iI & Gas CUBS v:,II¡IIIISSILH,
ð. n chili (ii~¡e
f,...' Ar' ø" I
n ~' ' ~ <, I! ,a 1\
\ I 1 I tt . ,
,. ,-:' r ,"~ ~" ,\! .",\ ~
~" i .! ~ ~ I 1: It 'I:' t) :.....
'\ STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 StaTuS 01 well
Od 0 Gas 0
2. Name of Operator
Phillips Alaska. Inc.
3. Address
Suspended
0
Abandoned 0
Service [;]
1&t4";1'\-'¡~' Classification 01 Servll:e Well
~ ~ Produced Water Injector
~~ \ 7 Permit Number
! ~..~ 201-139/301-272
-,. - T ,- - - .-,,^- 8. API Number
1571' FNL. 823' FWL, Sec. 12, T11 N, R10E, UM
At Top Producing Interval
1134' FNL. 1898' FWL. See, 11. T11N. R1OE. UM
At TOlal Depth
1112' FNL. 1743' FWL. Sec. 11. T11N. R10E, UM (ASP: 557467, 5969089)
5, Elevation in leet (indicate KB. DF, etc.) 6, lease Designation and Serial No,
KB 102' AMSL ADL 25649 ALK 467
,/ P /ç. b"\ . 50-029-23034
'--. . - -~,' 9. Umt or lease Name
(ASP: 561831, 5968664)"dD :~ Kuparuk River Unit
. ... ~-:- .10 Well Number
P. O. Box 100360, Anchorage, AK 99510-0360
4. location 01 well at surface
(ASP: 557623, 5969067)
1 C-119
11, Field and Pool
Kuparuk River Field
West Sak 011 Pool
12, Date Spudded
August 7. 2001
17. Total Depth (MD + TVD)
6606' MD 14272' TVD
13. Date T.D, Reached
August 11 , 2001
18. Plug Back Depth (MD + TVD)
6498' MD 14170' TVD
14, Date Comp.. Susp. Or Aband
April 15, 2002
19, Directional Survey
YES 0 No 0
15, Water Depth, II offshore
16. No, 01 Completions
N/A
20. Depth where SSSV sel
N/A
I.".! MSL
21. Thickness of Permafrost
feel MD
2286'
22, Type Electnc or Other logs Run
GR/Res/Den/Neu, CBL, GR/CCL
23,
CASING SIZE
16"
5.5"
3.5"
WT PER FT.
62.5#
15.5#
9,3#
GRADE
H-40
L-80
L-80
CASING. LINER AND CEMENTING RECORD
SETTING DEPTH MD
TOP BOTTOM
Surface 158'
Surface 5799'
5799' 6594'
HOLE SIZE
24"
7,875"
7.875"
CEMENTING RECORD
320 sx AS 1
570 sx AS IlIl, 365 sx Class G
(included above)
AMOUNT PUllED
3.5"
TUBING RECORD
DEPTH SET (MD)
5785'
PACKER SET (MD)
N/A
24. Perforations open to Production (MD + TVD of Top and Bottom and
mterval, size and number)
25.
SIZE
6054' - 6092' MD 3757' - 3791' TVD 4 spf
5986' - 6022' MD 3697' - 3729' TVD 4 spf
26.
ACID, FRACTURE, CEMENT SQUEEZE. ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
N:A
27.
Date Firs! Production
N/A
Date of Test
N/A
Hours Tested
PRODUCTION TEST
Method of Operation (Flowing. gas lift. etc.,
Injecting
Production for Oll-BBl
Test Penod >
CalculaTed
GAS-MCF
WATER-BBl
CHOKE SIZE
GAS-Oil RATIO
Flow Tubing
Casing Pressure
Oll-BBl
GAS-MCF
WATER-BBl
Oil GRAVITY - API (corr)
24-Hour Rate>
28.
CORE DATA
Brief description of lithology, porOSity, fractures, apparent dips and pressence 01 oil, gas or water. Submit core chips.
N/A
r,\:,' "I,i,':~ ,j.' ...' ',- 4 ~, I' f" f~~
- ' ~'~ {../
(J -'<":" ,. -:
r; n r¡ .;
1... v,- '-.
,/ilas!<a DII & G~!S (;ens, l;~1¡'W¡"¡¡:';::-;,IO'
!\neJwm;Je
Form 10-407 Rev. 7-1-80
CONTINUED ON REVERSE SIDE
;
RBDMS BFl
Submit In duplicate
MAY I.') ?nn?
G, \:::
,-.-, , r'
29.
30.
GEOLOGIC MARKERS
FORMATION TESTS
NAME
MEAS.DEPTH
TRUE VERT. DEPTH
Include interval tested, pressure data, all fluids recovered and gravity.
GOR. and lime of each phase.
West Sak C \./
West Sak D
West Sak A-3
6024'
5984'
6146'
3730'
3696'
3839'
Annulus left open - freeze protected with diesel.
31, LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey
32.
I hereby certify Ihat the following IS true and correct 10 the best of my knowledge,
Questions? Call Steve McKeever 265-6826
Signed ~v.........,..t.~~---- Tille
R. Thom3s
Kuparuk Dnlhnq Team Leader
Date
.;- /2. If.) L
Prepared by Sharon AI/sup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other
spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in
item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each
additional interval to be separately produced, showing the data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, s~. ~r~'f. ~ '/V,a" }e~~,' action, Gas Injection,
Shut-in, Other-explain. J~ t t., ::..., ~ \ t~.l
Item 28: If no cores taken, indicate "none".
:,1 ''''',' ,,': "/ '::\(\n~'
~ ~._. .' : .....IJ,-'l.-
Form 10-407
.-\ "',: .
" I
Alaska ûd is C<;~ Cl.::j!~:, t.:l'f,hlill~':~~!U.
i\ r¡trl;')(;;~ I~~~
~.
~
~~
Page 1 of 4
PHILLIPS ALASKA INC.
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-11 9
1 C-11 9
ROT - DRILLING
n1268@ppco.com
Nabors 245
Sub
Hours Code Code
Phase
Date
From - To
8/6/2001
1.00 MOVE MOVE MOBMIR
1.50 WELCTL NUND SURFAC
2.00 DRILL RIRD SURFAC
07:00 - 08:00
08:00 - 09:30
09:30 - 11 :30
11 :30 - 12:00 0.50 WELCTL BOPE SURFAC
12:00 - 13:00 1.00 DRILL RIRD SURFAC
13:00 - 20:00 7.00 DRILL OTHR SURFAC
20:00 - 21 :00 1.00 RIGMNT RSRV SURFAC
21 :00 - 00:00 3.00 DRILL TRIP SURFAC
8/7/2001 00:00 - 01 :00 1.00 DRILL OTHR PROD
01 :00 - 01 :30 0.50 DRILL SFTY PROD
01 :30 - 02:00 0.50 DRILL TRIP PROD
02:00 - 05:00 3.00 DRILL DRLG PROD
05:00 - 06:00 1.00 DRILL DRLG PROD
06:00 - 06:30 0.50 DRILL TRIP PROD
06:30 - 08:00 1.50 DRILL OTHR PROD
08:00 - 11 :00 3.00 DRILL OTHR PROD
8/8/2001
11 :00 - 12:00 I 1.00 DRILL TRIP PROD
12.00 DRILL DRLG PROD
12.00 - 00.00 ,
00:00 - 12:00 12.00 DRILL DRLG PROD
12:00 - 12:30 0.50 RIGMNT RSRV PROD
12:30 - 00:00 11.50 DRILL DRLG PROD
00:00 - 01 :00 1.00 DRILL DRLG PROD
01 :00 - 02:00 1.00 DRILL CIRC PROD
02:00 - 04:30 2.50 DRILL TRIP PROD
04:30 - 06:30 2.00 DRILL TRIP PROD
06:30 - 08:30 2.00 DRILL TRIP PROD
08:30 - 09:00 0.50 RIGMNT RSRV PROD
09:00 - 11 :30 2.50 DRILL TRIP PROD
11 :30 - 12:00 0.50 DRILL DRLG PROD
8/9/2001
Spud Date: 8/7/2001
End: 8/17/2001
Group:
Start: 8/6/2001
Rig Release: 8/17/2001
Rig Number: 245
Description of Operations
Move Rig f/ 1c-123 to 1c-119 (60')
Nipple up diverter system.
Rig up to function test diverler. P/U landing
joint. prepare floor for picking up DP. Mix
spud mud.
Function test diverter system. Perform accu
mulator test. Witnessing of test waived by A
OGCC rep. Chuck Scheve.
M/U casing hanger make dummy run wI same
to ensure clearance. LID hanger & landing j
0 in t.
P/U HWDP, Jars. 180 joints of DP & set bac
k in derrick.
Cui Drilling line 111'.
P/U Bit & BHA. Orient & program tools.
Fill stack & check surface equipment for lea
k s.
Hold pre-spud meeling with rig team member
s & Company man.
P/U 2, Flex DC's, tag @ 145'. C/O to 158'
Drilling 7-7/8" hole fI 158' to 277' ADT=
Attempt to get MWD survey. Could not get a
p u I s e.
POOH for MWD.
Check tools, LID MWD (pulser) Debris in too
Is. Service Top Drive.
P/U tools Plug In & program. Tools did not h
ave annulus press tool installed. LID tools
& work on same. P/U tools, program & orient
I 100 Is.
RIH wi 1 sid of flex collars. shallow test M
I'WD. Continue RIH to 277'
Drilling 7-7/8" Hole fI 277' to 1183' AST=3.
3 hrs ART=3.8 hrs
Drilling 7-7/8" Hole f/ 1183' 102121' AST=4
.4 hrs ART=2,2 hrs
Service Rig & Top Drive
Drilling 7-7/8" Hole FI 2121' to 3443' AST=.
4 hr ART=6.7 hrs.
Drilling 7-7/8" Hole fI 3443' to 3539' ADT=O
hr ART= .6 hrs
Circ & Cond for trip, MWD Check Shot, Man
itor well (OK)
POOH, Monitor well @ HWDP. Pulled 20k ov
er @246'. Change bit.
Down load LWD I MWD data, Reset AKO on
motor to 1.2". Oieint tools.
RIH, Shallow test MWD, Wash & Ream Thru
bridges fI 246' to 505'.
Service Rig & Top Drive.
'RIH to 3068', Small Bridges, Wash & Ream t
0 3539'
Drilling 7-7/8" Hole f/ 3539' to 3572' ART=.
Pnnt",d: J.22'2002 2,)43(1 PM
~,
~
~
Page 2 of 4
PHILLIPS ALASKA INC.
Operations Summary Report
Legal Well Name: 1 C-119
Common Well Name: 1 C-119
Event Name: ROT - DRILLING
Contractor Name: n1268@ppco.com
Rig Name: Nabors 245
Date From - To Hours Code Sub Phase
Code
8/9/2001 11 :30 - 12:00 0.50 DRILL DRLG PROD
12:00 - 00:00 12.00 DRILL DRLG PROD
8/10/2001 00:00 - 12:00 12.00 DRILL DRLG PROD
12:00 - 12:30 0.50 RIGMNT RSRV PROD
12:30 - 00:00 11.50 DRILL DRLG PROD
8/11/2001 00:00 - 04:00 4.00 DRILL DRLG PROD
04:00 - 05:00 1.00 DRILL CIRC PROD
05:00 - 10:30 5,50 DRILL TRIP PROD
10:30 - 11 :30 1.00 DRILL OTHR PROD
11 :30 - 12:00 0.50 DRILL TRIP PROD
12:00 - 13:30 1.50 DRILL OTHR PROD
13:30 - 14:00 0.50 RIGMNT RSRV PROD
14:00 - 14:30 0,50 DRILL TRIP PROD
14:30 - 19:30 5.00 DRILL TRIP PROD
19:30 - 23:00 3.50 DRILL CIRC PROD
23:00 - 00:00 1.00 DRILL TRIP PROD
8/12/2001 100:00 - 01 :30 1.50 DRILL TRIP PROD
01 :30 - 02:00 0.50 DRILL SFTY PROD
02:00 - 03:30 1.50 DRILL ,TRIP PROD
03:30 - 04:30 1.00 CASE OTHR PROD
04:30 - 05:00 0.50 CASE SFTY PROD
05:00 - 08:30 3.50 CASE RUNC PROD
08:30 - 09:30 1.00 CASE RUNC PROD
09:30 - 12:00 2.50 CASE RUNC PROD
12:00 - 12:30 0.50 CASE CIRC PROD
12:30 - 16:00 3.50 CASE RUNC PROD
16:00 - 20:30 4.50 CEMENT CIRC PROD
20:30 - 22:00 1.50 CEMENT PUMP PROD
Spud Date: 817/2001
End: 8/17/2001
Group:
Start: 8/6/2001
Rig Release: 8/17/2001
Rig Number: 245
Description of Operations
5 hrs. TVD=2313'
Drilling 7-7/8" Hole fI 3572' to 4954' ART=6
.2 hrs AST=1.6 hrs. TVD= 2930'
Drilling 7-7/8" Hole fI 4954-5808' ART= 4.4
hrs. AST=2.8 hrs. TVD= 3539'
Service Rig & Top Drive.
Drilling 7-7/8" Hole fI 5805' to 6380' ART=4
.1 hrs AST=4.1 hrs TVD=4058'
Drilling 7-7/8" Hole fl 6380' to 6606' ART=3.
7 hrs AST=O hr. TVD=4271'
Pump Densified sweep, Circ & Cond for Trip.
Monitor well, Pump slug.
POOH. Monitor well @ HWDP, PJSM (BHA).
Tight @ 733'. Pump out fI 733' to 673'. Cont
inue POOH pulled 20k over @ 491'. Break or
f bit.
Download MWD data.
L/D BHA
PJSM. Pick up 33 joints 3-1/2" tubing & stan
d back in Derrick for Port collar contingency
Service Rig & Top Drive.
Make up Hole Opener Assy.
\RIH' tight @ 6000', Wash & ream to bottom
@ 6606'. No fill.
¡CirC & Cond Mud for casing run. Pump 2 Den
sified sweeps around, fair amount of cutting
s 1st sweep, very little on 2nd sweep,
Monitor well, pump slug, POOH w/ Hole Ope
ner assy.
¡POOH w/ Hole Opener to HWDP.
Monitor well @ HWDP, PJSM on BHA
[POOH, LID Hole Opener assy.
Clean up floor. Rig up casing equipment.
\PJSM on running casing wI Company man &
Toolpusher.
¡Run 3-1/2" casing, PIU 5-1/2" casing [ools,
Franks fill up tool. Run 5-1/2" casing Bridg
'e @ 1345'
Circulate & Work thru bridges fI 1345'-1450'
RIH w/ 5-1/2" casing. Circulate @ 2500' one
casing volume. Continue to run casing.
Circulate & Condition mud @ 4500' 5 bpm. g
ood returns, no losses.
Run 5-1/2" casing. L/D Franks fill up [001. M
ake up Hanger & Landing joint. Land (asing.
Circulate & Condition for cement job. Recipr
ocate casing wI circ. Increase rate to 6 bpm
. PJSM On cementing casing.
Cement wI Dowell. Pump 10 bbls preflush, P
.T. lines to 3500 psi. pump 50 bbls preflush
Prrnl",d' J 22'2002 21)4.30 PM
~.
~
~
Page 3 of 4
PHILLIPS ALASKA INC.
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
8/12/2001
8/13/2001
8/14/2001
8/15/2001
1 C-119
1 C-119
ROT - DRILLING
n1268 @ ppco.com
Nabors 245
Sub
From - To Hours Code Code Phase
20:30 - 22:00
1.50 CEMENT PUMP PROD
22:00 - 00:00
2.00 CEMENTOTHR PROD
00:00 - 10:30
10.50 CASE RUNC CMPL TN
10:30 - 11 :00 0.50' CASE RUNC CMPL TN
11 :00 - 19:30 8.50 CASE RUNC CMPL TN
19:30 - 22:30 3.00 CASE OTHR CMPL TN
22:30 - 00:00 1.50 CASE OTHR CMPL TN
00:00 - 01 :00 1.00 CASE OTHR CMPL TN
01 :00 - 02:30 1.50 CASE OTHR CMPL TN
02:30 - 03:30 1.00 CASE OTHR CMPL TN
03:30 - 04:30 1.00 CASE OTHR CMPL TN
04:30 - 05:30 1.00 CASE OTHR CMPL TN
05:30 - 07:00 1.50 CASE OTHR CMPL TN
07:00 - 11 :00 4,00 CASE OTHR CMPL TN
11 :00 - 11 :30 0.50 CASE OTHR CMPL TN
11 :30 - 15:00 3.50 CASE OTHR CMPL TN
15:00 - 15:30 0.50 CASE OTHR CMPL TN
15:30 - 17:30 I 2.00 CASE OTHR CMPL TN
17:30 - 21 :00 3.50 CASE OTHR CMPL TN
21 :00 - 00:00 3.00 CASE OTHR CMPL TN
00:00 - 01 :00 1.00 CASE OTHR CMPL TN
01 :00 - 01 :30 0,50 CASE OTHR CMPL TN
01 :30 - 02:00 0.50 CASE OTHR CMPL TN
02:00 - 04:00 2.00 CASE OTHR CMPL TN
04:00 - 05:00 1.00 CASE OTHR CMPL TN
05:00 - 09:30 4.50 CASE OTHR CMPL TN
09:30 - 10:00
0.50 CASE OTHR CMPL TN
Spud Date: 8/7/2001
End: 8/17/2001
Group:
Sta r1: 8/6/2001
Rig Release: 8/17/2001
Rig Number: 245
Description of Operations
, Drop Bottom plug. Pump 50 bbls Mudpush
XL @ 10.2 ppg., 122 bbls Lead cement @ 10
.7 PPG. Casing string plugged off. Attempt t
0 clear casing & regain circulation to no ava
il. Casing capacity to landing collar 145.5 b
bls. Cement not at landing collar.
Attempt to clear casing & regain circulation
to no avail. Casing capacity to landing call
ar 145.5 bbls. Cement not at landing collar,
Casing string free & moving good. Rig up to
lay down casing. POOH wI plugged casing
string.
POOH, LID casing. (full of cement). Change
out slips & elevators. Continue to LID cas in
g.
Rig up Vac truck Line to rig floor to evacuat
e cement out of drains ect.
Continue POOH LID casing. Retrieved all ca
sing & all centralizers.
Clean rig of cement, clean out all drains & s
umps eeL
Rig up floor to run DP. Adjust bale kicker, P
IU Hole Opener assy.
PU 7 7/8" hole opener, MU BHA.
RIH wI 7 7/8" hole opener to 2000'.
Circ & Condition hole (4000 strokes, 403 bbl
s)
RIH wI 77/8" hole opener to 4421'.
Circ & Condition hole (3230 stokes, 325 bbl
s )
RIH wI 7 7/8" hole opener to 6606'.
Circ & Condition hole.
Monitor well, PJSM, Pump dry job.
POOH to 600'.
Service rig and top drive.
RIH to 6606'.
Circ & Condition mud and hole for casi ng jo
b. Monitor well prior to POOH. OK.
PJSM, Pump dry job, POOH for casing,
LD hole opener and BHA. Clean up rig floor.
RU to run 3 1/2" x 5.5" casing.
PJSM wI all team memebers on running casi
n g.
Run 25 joints 3 1/2" casing, checked floats
on joint # 4. OK.
PU 3 1/2" x 5.5" x-a, SBE, Change running e
quip to 5,5". Circ wI fill up tool. OK.
Run 5.5" casing, fill up every joint. top off e
very 10th joint. Hole displacement accurate.
Hung up on joint # 127 (Port collar @,' 635')
, work through spot and run total of 135 join
ts.
PU landing joint, land casing, RU cement he
Pr,,,,ed' J,22.2002 2,)4'30 PM
~þ
~
~
Page 4 of 4
PHILLIPS ALASKA INC.
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-11 9
1 C-11 9
ROT - DRILLING
n1268@ppco.com
Nabors 245
Date
Sub
From - To Hours Code Code Phase
8/1 5/2001
09:30 - 10:00
10:00 - 15:30
0.50 CASE OTHR CMPL TN
5.50 CASE OTHR CMPL TN
15:30 - 16:00
16:00 - 18:00
0.50 CASE OTHR CMPL TN
2.00 CASE OTHR CMPL TN
18:00 - 19:00
1.00 CEMENT DISP CMPL TN
19:00 - 23:00
4.00 CEMENT OTHR CMPL TN
23:00 - 00:00 1.00 CEMENT PULD CMPL TN
8/16/2001 00:00 - 02:00 2.00 CMPL TN NUND CMPL TN
02:00 - 04:00 2.00 CMPL TN NUND CMPL TN
04:00 - 06:30 2.50 CMPL TN NUND CMPL TN
06:30 - 08:00 1.50 WELCTL OTHR CMPL TN
08:00 - 08:30 0.50 WELCTL OTHR CMPL TN
08:30 - 12:00 3.50 WELCTL BOPE CMPL TN
12:00 - 12:30 0.50 WELCTL OTHR CMPL TN
12:30 - 13:00 0.50 CMPL TN RURD CMPL TN
13:00 - 13:30 0.50 CMPL TN SFTY I CMPL TN
13:30 - 18:30 5.00 CMPL TN RUNT CMPL TN
18:30 - 20:00 1.50 CMPL TN SOHO CMPL TN
20:00 - 21 :00 1.00 CMPL TN CIRC CMPL TN
21 :00 - 22:00 1.00 CMPL TN FRZP CMPL TN
22:00 - 00:00 2.00 CMPL TN FRZP CMPL TN
8/17/2001 00:00 - 02:00 2.00 CMPL TN FRZP CMPL TN
02:00 - 04:30 2.50 CMPL TN NUND CMPL TN
04:30 - 07:00 2.50 CMPL TN NUND CMPL TN
07:00 - MOVE OTHR MOBMIR
Spud Date: 8n /2001
End: 8/17/2001
Group:
Start: 8/6/2001
Rig Release: 8/17/2001
Rig Number: 245
Description of Operations
ad.
Break circ slowly @ 2.5 bpm, increase to 6
bpm. Hole displacement calc 33.6, actual 34
. Circ & condition for cement job.
PJSM wI Team members before cement job.
Test cement lines @ 3500 psi. Cement per p
rogram.
Displace cement wI seawater with rig pumps .~
. Bump plug @ calculated strokes. CIP @ 18
:50 hrs 8-15-2001
Check floats. not holding. Repressure to 20
00 psi. check floats. still not holding. repre
ssure to 2500 psi. then bleed back to 1200
psi and hold pressure.
Check floats. Holding OK. RD cement equip
'ment and landing joint.
Install gravel protector. Flush out diverter a
nd knife valve, ND diverter. remove 16" knif
e valve.
Install tubing head. Test to 1000 psi for 10
min. Install DSA and 13 5/8" 5m riser.
NU 135/8" BOPE.
RU to test BOPE.
Fill BOP stack. function test chart recorder.
Test BOPE. Test witness waived by AOGCC i
nsp. John Crisp.
RD test equip. Blow down choke manifold.
RU to run 3 1/2" completion.
PJSM wI team members on running 3 1/2" co
mpletion.
Run 184 joints 31/2" tubing.
Rig up to pump down tubing to locate seals.
Space out for tubing hanger. Final tubing i
n hole 181 joints 10' pup. 6' pup. jOint # 18
2. 3' pup on hanger and hanger.
Circulate and displace well with 200 bbls se
awater.
Drain stack. Close annular and reverse 60 b
bls diesel into well taking tubing returns to
pit s .
U tube diesel from annulus to tubing.
Continue to U tube diesel. Land tubing. Rig
¡down landing Joint. Set BPV.
PJSM. Nipple Down BOPE, flowline, fillup Ii
n e.
NU tree and test same, Secure tree. Clean c
ellar. Blow down lines.
Rig released for 270' inline move (away fI C
PM) to well 1 C-1 02 ML
Pr,n¡.;,>d '¡'22120ü2 20.4:30 PM
Date
09/05/01
09/08/01
09/09/01
09/10/01
09/13/01
09/17/01
09/20/01
04/14/02
04/15/02
1 C-119 Event History
Comment
TAGGED MUD IN PROD. CASING @ 6028'WLM [TAG]
ATTEMPTED TO PERFORM A FCO WITH A 2" SWIRL JET NZL. TAGGED HARD AT 6064' CTMD,
CHANGED TOOLS OVER TO PDM AND 2.70 MILL. MILL FROM 6064'-6200'. SHUT DWN FOR THE NIGHT.
CONTINUE ON 9-9-01. [FCO]
MILLED OUT CEMENT TO 6471.9' CTMD. PERFORMED STATE TEST FOR TUBING & IA TO 3000#. WELL
FREEZE PROTECTED TO 3700'. TD = 6472' [FCO]
TAG HARD CEMENT @ 6224' SLM.COIL WORK NEEDED. [TAG]
PERFORMED A FCO TO 6457.6' CTMD. ATTEMPTED A 2.5" SWIRL JET NZL, CHANGED BHA TO A 1.75"
VORTECH NZL, DEFINITELY CLEANED CEMENT SHEAN OFF TUBING WALL. WELL FREEZE
PROTECTED TO 2500'. [FCO, VORTECH]
DRIFT TUBING WITH 19' X 2.5" BAILER TO 6460'WLM [TAG]
RAN CEMENT BOND LOG W/ SCMT-A/ PSP (41'), LOGGED SCMT WITHOUT PRESSURE, LOCATED TOP
OF CEMENT @ 5790' WITH GOOD CEMENT DOWN TO TO (EXCEPT FOR ONE 20' SECTION 6150'-6170'),
MADE JEWELRY LOG.
RIG UP RUN GAMMA RAY/CCL FOR DRIFT AND TAG RUNPRIOR TO RUNNING PERF SERVICES-- TAG
FOUND @ 6460-- NO PULLS NO PROBLEMS-
RIG UP RUN 2.5 HSD BH GUNS LOADED 4 SPF-- TOTAL OF 74 FT - 300 SHOTS-- PERF INTERVALS ARE
.- 6054 TO 6092 & 5986 TO 6022-- PRESSURE/ TEMP STATION RAN AFTÇß PERF - STATION LOG LOG
RAN @ 6040--------MAX TEMP 76
Page 1 of 1
4/19/2002
= SURVEY CALCULATION AND FIELD WORKSHEET Job No, 0450-00097 Sidetrack No. Page 1 of 3
-
Company PHILLIPS ALASKA, INC, Rig Contractor & No, Nabors Alaska Dring - Rig: #245E Field KUPARUK RIVER UNIT
Well Name & No. PAD 1 C/119 Survey Section Name Definitive Survey BHI Rep, D BALLOU I R FUHRER
INTEQ WELL DATA
Target TVD (FT) Target Coord. N/S Slot Coord. N/S -1571.00 Grid Correction 0.000 Depths Measured From: RKB ~ MSL 0 SSO
Target Description Target Coord. E/W Slot Coord. E/W 823.00 Magn. Declination 26.180 Calculation Method MINIMUM CURVATURE
Target Direction (DO) Build\Walk\DL per: 1 OOft~ 30mO 10m I] Vert. Sec. Azim. 275.99 Magn. to Map Corr. 26.180 Map North to: OTHER
SURVEY DATA
Survey Survey Inc!. Hole Course Vertical Total Coordinate Build Rate Walk Rate
Date Tool Depth Angle Direction Length TVD Section N(+) / S(-) E(+) I W(-) DL Build (+) Right (+) Comment
Type (FT) (DO) (DO) (FTl (FT) (FT) 1FT) (Per 100FT) Drop (-) Left (-)
0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIE IN POINT
06-AUG.01 MWD 158.00 0.00 0.00 158.00 158.00 0.00 0.00 0.00 0.00 0.00
07-AUG-01 MWD 231.00 0.53 90.87 73.00 231.00 -0.34 -0.01 0.34 0.73 0.73
07-AUG-01 MWD 298.71 0.35 103,88 67.71 298.71 -0.85 -0,06 0.85 0.30 -0.27
07-AUG-01 MWD 391,19 2.46 213,56 92,48 391.16 -0.21 -1.78 0.03 2.81 2.28
07-AUG-01 MWD 478.00 6.15 226.92 86,81 477.71 3.70 -6.51 -4.40 4.38 4.25 15.39
07-AUG-01 MWD 569.10 8.61 232,90 91.10 '568.05 11.87 -13.96 -13.40 2.83 2.70 6.56
07-AUG-01 MWD 664.31 15.29 239,93 95.21 661.15 27.25 -24.56 -29.97 7.17 7.02 7.38
07-AUG-01 MWD 754.92 18.28 244.85 90.61 747.89 49.07 -36.59 -53.18 3.65 3.30 5.43
07-AUG-01 MWD 845.87 18.98 246,26 90.95 834.08 74.12 -48.61 -79.63 0.92 0.77 1,55
07-AUG-01 MWD 936.26 19.60 249.42 90.39 919.40 1 00.45 -59,85 -107.28 1.34 0.69 3.50
07-AUG-01 MWD 1 026.63 23,29 256.81 90.37 1003.51 130.90 -69.26 -138.88 5.05 4.08 8,18
07-AUG-01 MWD 1117.67 29,62 264.19 91.04 1085.00 169.97 -75.66 -178.84 7.82 6.95 8,11
08-AUG-01 MWD 1209.71 34.10 269.46 92.04 1163.17 217.90 -78.20 -227.30 5.73 4.87 5.73
08-AUG-01 MWD 1299.78 36.47 271.92 90.07 1236.69 269.70 -77.54 -279.31 3.07 2.63 2.73
08-AUG-01 MWD 1392.56 38.85 270.52 92.78 1310.13 326.18 -76.36 -335.98 2.73 2.57 -1,51
08-AUG-01 MWD 1487.89 44.38 271 .92 95.33 1381 ,38 389,24 -74.97 -399.25 5.88 5.80 1.47
08-AUG-01 MWD 1583.32 50.36 275.09 95.43 1445.99 459,34 -70.58 -469.27 6.72 6.27 3.32
08-AUG-01 MWD 1676.05 50.89 276.84 92.73 1504.82 531.02 -63.13 -540.56 1.57 0.57 1,89
08-AUG-01 MWD 1771 .66 55.55 277 .55 95.61 1562.05 607.56 -53.53 -616.51 4.91 4.87 0,74
08-AUG-01 MWD 1866.88 60.56 279.31 95.22 1612.42 688.25 -41.65 -696.40 5.49 5.26 1.85
OB-AUG-01 MWD 1960.71 65.65 280.36 93.83 1654.85 771 .72 -27.35 -778.82 5.52 5.42 1,12
08-AUG-01 MWD 2052.77 64.69 279.66 92.06 1693.51 855.06 -12.82 -861.10 1.25 -1.04 -0.76
08-AUG-01 MWD 2148.07 66.45 277.20 95.30 1732.92 941.74 -0,12 -946.92 2.99 1.85 -2,58
- -
= SURVEY CALCULATION AND FIELD WORKSHEET Job No. 0450-00097 Sidetrack No. Page 2 of 3
Company PHilLIPS ALASKA, INC. Rig Contractor & No. Nabors Alaska Dring - Rig: #245E Field KUPARUK RIVER UNIT
Well Name & No. PAD 1 C/119 SUNey Section Name Definitive SUNey BHI Rep, D BAllOU I R FUHRER
INTEQ WELL DATA
Target TVD (FT) Target Coord. N/S Slot Coord. N/S -1571.00 Grid Correction 0.000 Depths Measured From: RKB ~ MSL 0 SSD
Target Description Target Coord. E/W Slot Coord. E/W 823.00 Magn. Declination 26,180 Calculation Method MINIMUM CURVATURE
Target Direction (DO) Build\Walk\Dl per: 10Oft~ 30mO 10mD Vert. Sec. Azim. 275.99 Magn, to Map Corr. 26.180 Map North to: OTHER
SURVEY DATA
SUNey SUNey Incl. Hole Course Vertical Total Coordinate Build Rate Walk Rate
Date Tool Depth Angle Direction length TVD Section N(+) I S(-) E(+) I W(-) Dl Build (+) Right (+) Comment
Type (FT) (DO) (DO) (FT) (FT) (FT) (FT) (Per 100FT) Drop (-) left (-)
08-AUG-01 MWD 2241.91 66.27 277.55 93.84 1770.55 1027.68 10.92 -1032.17 0.39 -0.19 0.37
08-AUG-01 MWD 2335.45 64.51 276.49 93.54 1809.51 1112.70 21.31 -1116.57 2.15 -1.88 -1.13
08-AUG-01 MWD 2428.56 67.59 275.79 93.11 1847.30 1197.78 30.41 -1201.17 3.38 3.31 -0.75
08-AUG-01 MWD 2522.28 66,18 275.44 93.72 1884.09 1283.97 38.84 -1286.95 1.54 -1.50 -0.37
08-AUG-Ol MWD 2615.29 66.18 276.49 93.01 1921 .66 1369.06 47.68 -1371.57 1.03 0.00 1.13
08-AUG-01 MWD 2709.53 66.45 276.14 94.24 1959.51 1455.36 57.18 -1457.35 0.44 0.29 -0.37
08-AUG-Ol MWD 2804.08 66.53 276.84 94.55 1997.23 1542.06 66.98 -1543.49 0.68 0.08 0.74
08-AUG-Ol MWD 2900.70 66.62 275.79 96.62 2035.64 1630.71 76.73 -1631.61 1.00 0.09 -1.09
08-AUG-Ol MWD 2995.21 65.74 277.20 94.51 2073.81 1717.16 86.50 -1717.51 1.65 -0.93 1.49
08-AUG-Ol MWD 3087.77 65.74 277,90 92.56 2111.84 1801 .52 97.59 -1801.17 0.69 0,00 0.76
08-AUG-Ol MWD 3182.06 65.39 277.90 94.29 2150,85 1887.31 109.39 -1886.20 0.37 -0.37 0,00
08-AUG-01 MWD 3277.70 65.21 278.60 95.64 2190.81 1974,14 121.86 -1972.19 0.69 -0,19 0.73
08-AUG-Ol MWD 3372.02 65.39 278.60 94.32 2230.23 2059.74 134.67 -2056.91 0.19 0.19 0,00
09-AUG-Ol MWD 3467.40 65.48 278.95 95.38 2269.88 2146,38 147.91 -2142,64 0.35 0.09 0,37
09-AUG-Ol MWD 3565.79 65.48 278.95 98.39 2310.71 2235,78 161.83 -2231.07 0.00 0.00 0.00
09-AUG-Ol MWD 3659.43 65.21 278.95 93.64 2349.77 2320.77 175.07 -2315.14 0.29 -0.29 0.00
09-AUG-Ol MWD 3752,82 65.04 279.31 93.39 2389.06 2405.37 188.51 -2398.79 0.39 -0.18 0.39
09-AUG-01 MWD 3847.96 64.95 279.66 95.14 2429.27 2491.43 202.72 -2483.84 0.35 -0,09 0.37
09-AUG-Ol MWD 3942.55 64.95 279.31 94.59 2469.32 2576.96 216.84 -2568.36 0.34 0.00 -0.37
09-AUG-Ol MWD 4035.94 63.98 278.95 93.39 2509.58 2661.10 230.22 -2651.55 1.10 -1.04 -0.39
09-AUG-Ol MWD 4129,83 64.16 278.95 93.89 2550.64 2745.43 243.35 -2734.96 0,19 0,19 0.00
09-AUG-01 MWD 4224.82 63.81 279,66 94.99 2592.30 2830.65 257.15 -2819.21 0,77 .0.37 0.75
09-AUG-Ol MWD 4320.76 64.16 278.95 95.94 2634.38 2916.72 271.09 -2904.29 0.76 0.36 -0.74
09-AUG-01 MWD 4413.21 64.78 278.95 92.45 2674.22 3000.03 284.07 -2986.70 0,67 0.67 0,00
---._----------------_..---_._--_...---------.~_.- - .. -- ----------
= SURVEY CALCULATION AND FIELD WORKSHEET Job No. 0450-00097 Sidetrack No. Page 3 of 3
-
Company PHILLIPS ALASKA, INC. Rig Contractor & No. Nabors Alaska Dring - Rig: #245E Field KUPARUK RIVER UNIT
Well Name & No. PAD' C/, '9 Survey Section Name Definitive Survey BHI Rep. D BALLOU / R FUHRER
INTEQ WELL DATA
Target TVD (FT) Target Coord. N/S Slot Coord. N/S -'571.00 Grid Correction 0.000 Depths Measured From: RKB ~ MSL 0 SSO
Target Description Target Coord. E/W Slot Coord. E/W 823.00 Magn. Declination 26.180 Calculation Method MINIMUM CURVATURE
Target Direction \00) Build\Walk\DL per: 100ft~ 30mO 10mD Vert, Sec. Azim. 275.99 Magn. to Map Corr. 26.180 Map North to: OTHER
SURVEY DATA
Survey Survey Inc!. Hole Course Total Coordinate Build Rate Walk Rate
Date Tool Vertical Build (+) Right (+) Comment
Depth Angle Direction Length TVD Section N(+) I S(-) E(+) I W(-) DL
Type (FT) (DO) (DO) (FT) (FT) (FT) (FT) (Per 100 FT) Drop (-) Left (-)
09-AUG-01 MWD 4507.99 64.95 276.84 94.78 2714.49 3085.79 295.86 -3071.68 2.02 0.18 -2.23
09-AUG-01 MWD 460' .74 64.86 276.84 93.75 2754.25 3170.68 305.97 -3155.98 0.10 -0.10 0.00
09-AUG-01 MWD 4695.60 63.02 276.49 93.86 2795.48 3254.98 315.76 -3239.72 1.99 -1.96 -0.37
09-AUG-01 MWD 4790,53 59.50 275.79 94.93 2841.12 3338.21 324.67 -3322.47 3.76 -3,71 -0.74
09-AUG-01 MWD 4885.77 56.34 275,44 95.24 2891 .69 3418.89 332.56 -3402.77 3.33 -3.32 -0.37
1 0-AUG-01 MWD 4981.91 53.61 275.79 96.14 2946.87 3497.61 340.26 -3481.11 2.86 -2.84 0.36
1 0-AUG-01 MWD 5076.69 50.80 276.84 94.78 3004,95 3572.50 348.49 -3555.54 3.09 -2.96 1,11
1 0-AUG-01 MWD 5174.04 47.90 276.14 97.35 3068.36 3646.35 356.84 -3628.92 3.03 -2.98 -0.72
1 0-AUG-01 MWD 5269.13 45.62 278.25 95.09 3133.50 3715.59 365.49 -3697.64 2.89 -2.40 2.22
1 0-AUG-01 MWD 5363.78 43.77 280.36 94.65 3200.78 3782.04 376.24 -3763.32 2.51 -1.95 2.23
1 0-AUG-01 MWD 5457.64 41.84 278.60 93.86 3269.64 3845.69 386.76 -3826.22 2.42 -2.06 -1.88
1 0-AUG-01 MWD 5552.39 39.64 278.60 94.75 3341 .43 3907.46 396.00 -3887.36 2.32 -2.32 0.00
1 0-AUG-01 MWD 5646.49 37.35 278.60 94.10 3415.07 3965.97 404.76 -3945.27 2.43 -2.43 0.00
1 0-AUG-01 MWD 5742.06 35.60 279.31 95.57 3491.92 4022.70 413.60 -4001 .39 1.88 -1.83 0.74
1 0-AUG-01 MWD 5836.21 33.49 277.55 94.15 3569.47 4076.03 421.44 -4054.19 2.48 -2.24 -1.87
1 0-AUG-01 MWD 5931,08 30.76 277.20 94.87 3649.80 4126.46 427.93 -4104.21 2.88 -2.88 -0.37
1 0-AUG-01 MWD 6028.16 28,65 275.79 97.08 3734.12 4174,56 433.39 -4152.00 2.29 -2.17 -1 .45
1 0-AUG-01 MWD 6123.96 25.31 274.38 95.80 3819.49 4218.01 437.27 -4195.28 3.55 -3.49 -1.47
1 0-AUG-01 MWD 6217.40 21,18 276.49 93.44 3905.32 4254.87 440.70 -4231.99 4.51 -4.42 2.26
1 0-AUG-01 MWD 6313.10 19.69 278,95 95.70 3995.00 4288.26 445,17 -4265.09 1.80 -1.56 2.57
11-AUG-01 MWD 6408.64 19.25 278.95 95.54 4085.08 4320.06 450.12 -4296.55 0.46 -0.46 0.00
11-AUG-01 MWD 6504.48 18.98 280.01 95.84 4175.63 4351.39 455.29 -4327.50 0.46 -0.28 1,11
11-AUG-01 MWD 6540.01 18.90 278.60 35.53 4209,24 4362.90 457.15 -4338.88 1.31 -0.23 -3,97
11-AUG-01 MWD 6606.00 18.90 278.60 65.99 4271.67 4384.25 460.35 -4360,02 0.00 0,00 0.00 Projected Data - NO SURVEY
Transmittal Form
INTEQ
To:
AOGCC
333 \Vest 7th Ave, Suite 100
Anchorage, Alaska
99501
Attention:
Lisa \Veepie
Reference:
1 C-119
- . ----- "---.------.-.- -------- - ---.----------------------- ---..
-- --",. . --_.. -- - .--. - .. .-. -- - ---- -- - - --.
:, Contains the following:
] LD\VG Compact Disc
" (Includes Graphic Image tiles)
! ] LD\\lG lister summary
ii ] blueline - l\1PR l\1easured Depth Log
;: 1 blue line - fv1PR TVD Log
II
I:
i'
\I
I,
Ii
LAC Job#: ] 60402
,-,,------ - ---- ------- -.-- ------ --- -.--.-------.------- ----- ---- ---- - - - - --. .
"-- --- -- -"-- ..--- - _.- ---.---- - -.. .. - .... -. - - -- - - ". --.
Sent By: Glen Horel
Received ~ (~ OOO'f...:J
é).ol-/39
"..
BAKER
HUGHES
Anchorage GEOScience Center
.. - ."'_.._--_.._.~--_..-.- --. --...
-- --" .--.- - --.-.- ---. - .
- ----.... -- .---_u_-.
-- ... -- --.-- ... --
Date: Oct 17, 2002
Date:
PLEASE ACKNO\VLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COP\'
Fl\X: (907) 267-6623
Baker Hughes INTEQ
7260 Homer Dri\"e
Anchorage, Alaska
99518
Direct: (907) 267-6612
FA,X: (907) 267-6623
RECEIVED
OCT 1 8 2002
Alaska 0.1 & Gas Cons. Commi.
Anchorage - .
- -- .. --
-'.--" -.-- ... - - .
rJn,." ',- ..0. "LI, I u.I
----
-. - . .""...
-... - .. .' .....
, .
-- - .. .. ...
'.. .. .. -- .
F:' I
1-. -.. . ,I .'.
.---. .
1I&.:P'l! ..., . . .'-"
---"-"--
-. .-.. . - .
~...-"V;
--- ---
I .
, :
i;
¡ ~
~
-==-
Schlumberger
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TTN: Beth
2H-09
1Q-09
1 C-125
2H-12
2T-39
1 B-04
3A-12
3A-13
2K-02
3N-07
2M-01
1C-119
Well
Log Description
Date
Job #
I <a'5- ~ 5q PRODUCTION PROFILE
[ ~-JQ~ INJECTION PROFILE
....;}O {-} q l:J INJECTION PROFILE
I~f)-~b~ PRODUCTION PROFILE
~ OJ- I <g ~ PRODUCTION PROFILE
I)? 1- 0 (0 5 INJECTION PROFILE
I ~5..~.3 9 STATIC PRESSURE SURVEY
19 .c;.... ~ «? I STATIC PRESSURE SURVEY
~~ -I ~ 1 PRODUCTION PROFILE
J ?fl.o . o.;¡ g-- LEAK DETECTION LOG
I <1~- 103 PRODUCTION PROFILE
dD/- 13 9 INJECTION PROFILE
08/29/02
09/04/02
09/11/02
09/07/02
09/09/02
09/04/02
08/31/02
08/31/02
09/08/02
08/30/02
09/13/02
09/05/02
SIGN~ ~
DATE:
09/23/02
NO. 2433
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Kuparuk
BL
CD
Color
Sepia
1
1
1
1
1
1
1
1
1
1
1
1
REceIVED
OCT 0' 200l
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you.
AI'" Oil I Gal Coni. CommIuktn
AndMøg8
Scblum_epgep
NO. 2082
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
05/16/02
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Well Job # Log Description Date BL Sepia
1 C-119 ~nl-/~ DRIFT & TAG 04/14/02 1 1
1 C-133 ~J-O 7 PRESSURE/TEMP LOG 04/14/02 1 1
1 C-133 Jt INJECTION PROFILE 04/14/02 1 1
1 D- 1 09 Jq 7-:::J~5 STATIC BOTTOM HOLE PRESSURE 04/11 /02 1 1
1 D-119 aQ-1~9 STATIC BOTTOM HOLE PRESSURE 04/11/02 1 1
1 D-132 qi- J;). J TEMPERATURE WARMBACKS 04/18/02 1 1
1 D- 132 ~ INJECTION PROFILE 04/18/02 1 1
1 R-35 dD}-dlO PRESSURE TEMPERATURE 04/21 /02 1 1
2D-02 1'1'1- 15:J PRESSURE-TEMP STATIONS 04/16/02 1 1
2P-431 aDd -o~ "3 PERF RECORD/STATIC SURVEY 04/19/02 1 1
2T-39 ~-Jg'~ PRODUCTION PROFILE 04/23/02 1 1
3B-14 J 5-Oc3L/ PRESSURE/TEMP LOG 04/15/02 1 1
3C-15 J c({5~;;)Q() PRESSURE/TEMP 04/13/02 1 1
SIGN~ {~O&p:J
DATE:
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you.
Kuparuk
CD
Color
RCliI::IVED
H,~~' 1 7 2002
AJaskaOil & Gas Cons.ComI11ision
Anct10rage
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Camille Taylor t;;\
Chair
DATE: April 25, 2002
SUBJECT: Mechanical Integrity Tests
THRU: Tom Maunder t' Q?T\ Phillips Alaska Inc.
P.I. Supervisor {¡;- v- ~ -D / 1 C
(~ 119, 123
FROM: John H. Spaulding Kuparuk River Unit
Petroleum Inspector Kuparuk River Field
NON. CONFIDENTIAL
Well 1C-119 Type Inj.
P.T.D. 2011390 Type test
Notes:
Well 1C-123 Type Inj. N T.V.D. 3688 Tubing
P.T.D. 2010840 Type test P Test psi 922 Casing
Notes: IA did not pressure up. Diagnostics in progress.
Well Type Inj. T.V.D. Tubing
P.T.D. Type test Test psi Casing
Notes:
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
Type INJ. Fluid Codes
F = FRESH WATER INJ.
G = GAS INJ,
S = SALTWATER INJ.
N = NOT INJECTING
s
P
Packer Depth Pretest Initial 15 Min.
TV.D. 3530 Tubing 1600 1600 1600
Test psi 883 Casing 1100 1950 1950
O\\CJ~\~~~
"C)-\--~Q\~~~ ~"'Œ
C\C)SoS C~Q:.C~ð~
~C!:)~); ~~~o..\~ J
("j "t:S c.'ct£ '?' ~ "-(
30 Min, I
1600 Interval I
1950 P/F e
Type Inj.
Type test
T.V.D.
Test psi
Tubing
Casing
Interval
P/F E
Interval
P/F
Interval
P/F
Interval
P/F
Type Inj.
Type test
T.V.D.
Test psi
Tubing
Casing
Type Test
M= Annulus Monitoring
P= Standard Pressure Test
R= Internal Radioactive Tracer Survey
A= Temperature Anomaly Survey
D= Differential Temperature Test
Interval
1= Initial Test
4= Four Year Cycle
v= Required by Variance
W= Test during Workover
0= Other (describe in notes)
Test's Details
Type the test details in here. Expand or cotract the row height as needed. The sheet js protected so you will need to
unprotect first. there is no password.
Type the test details in here. Expand or cotract the row height as needed. The sheet is protected so you wm need to
un protect first, there is no password.
M.I. T. IS performed:
Attachments:
Number of Failures:
Total Time during tests:
cc:
M IT report form
5/12/00 L.G.
mitis KRU 1 C 4-25-02 Revised js.xls
7/8/2002
10/24/2001
Schlullbepger
NO. 1566
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TTN: Sherrie
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Kuparuk
Well
Job #
Log Description
Date
BL
Sepia
CD
Color
1C-117.;}-Ol-/c:J ,
1 C-119 ~O)., '30,
2K-27 dÖ/-¡(O'1
_2N-302,~ D -, IS
.3K Q()
21439
21438
21440
21437
204"~
USIT v'
SCMT V
SCMT ./
SCMT /
5eMf
10/06/01
09/20/01
10/03/01
09/01/01
,01./"10/01
1
1
1
1
114-
SIGNED:~(~
RECEIVED
DATE:
OCT 30 2001
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Æbftiøwa.Gas Cons. Commissior,
Anchorage
/PHI~UP5'~
m !::~st~!:!~~IP~!~~~~d~~~
Post Office Box 100360
Anchorage, Alaska 9951D-0360
Chuck Mallary
Phone(907)265~4
Fax: (907) 265-1535
September 17, 2001
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Suite 100
Anchorage, Alaska 99501
(907) 279-1433
Re:
Application for Sundry Approvals, West Sak Dual Purpose WeIl1C-119.
Permit to Drill # 201-139
API # 50-029-23034
Dear Commissioners:
Further to a change in drilling procedure authorized by Tom Maunder on August 13, 2001, Phillips
Alaska, Inc. hereby requests a Sundry Approval for a well in the West Sak Oil Pool, designated #lC-119
Please find attached for the review of the Commission Form 10-403, and two attachments:
-a copy of the e-mail from Tom Maunder, authorizing the change in procedure.
-the Proposed Drilling Program which was submitted with the Application for Permit to Drill, and the
proposed procedure.
If you have any questions or require any further information, please contact Steve McKeever at 265-
6826.
Sincerely, '11tJ b/2..... A /
(};:~lIa; '.~-?
GKA Drilling Engineering Supervisor
RECEJVED
.s E p 1 ,:) ,2 n I] l
,.\/askd¡ì¡ (, '-, -
. -" ')I (.;¡as Lone;; I'~' -
'j,- -, . -,Imlrl/',,,,~,I;"
r I,h,.'ra':"",
OR\G\NAL
,{'1\ t ~
j iJ'
q \ \~
D7:!
Æ
./Js
,/~(\~
/ /<2c/o /
( STATE OF ALASKA (
ALM,:)KA OIL AND GAS CONSERVATION COMMI::'vION
APPLICATION FOR SUNDRY APPROVALS
1. Type of request:
Abandon- Suspend-
Aller casing - Repair well -
Change approved program_X
¡
i 2, Name of Operator
¡ Phillips Alaska, Inc.
I
i 3. Address
P. O. Box 100360
Anchorage, AK 99510-0360
i 4. Location of well at surface
1571' FNL, 823' FWL, Sec. 12, T11 N, R1 OE, UM
At top of productive interval
1134' FNL, 1898' FWL, Sec. 11, T11 N, R10E, UM
At effective depth
At total depth
1111' FNL, 3536' FEL, Sec. 11, T11 N, R10E, UM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length Size
CONDUCTOR 158' 16"
SURFACE- MONC 5697' 5-1/2"
SURFACE 795' 3-1 /2"
Perforation depth:
measured No Perfs
true vertical
¡TUbing (size. grade. and measured depth
I Packers & SSSV (type & measured depth)
Operational shutdown -
Plugging -
Pull tubing -
5. Type of Well:
Development -
Exploratory -
Stratigraphic -
Service_X
(asp's 561831,5968664)
(asp's 557467, 5969089)
(asp's 557467, 5969089)
6606 feet
4272 feet
6498 feet
4170 feet
Plugs (measured)
Junk (measured)
Cemented
320 sx AS I
570 sx AS Lite. 365 sx Class G
Included above
3-1/2",9,3#, L-80 Tbg @ 5785' MD.
No packer
No SSSV
13. Attachments Description summary of proposal J
14. Estimated date for commencing operation
September 17, 2001
16. If proposal was verbally approved
Re-enter suspended well -
Time extension - Stimulate -
Variance - Perforate -
6. Datum elevation (OF or KB feet)
RKB 38' feet
7. Unit or Property name
Other -
Kuparuk River Unit
8. Well number
1 C-11 9
9. Permit number / approval number
201-139
10. API number
50-029-23034
11. Field / Pool
Kuparuk River Field / West Sak Oil Pool
Measured Depth
158'
5799'
6594'
True vertical Depth
158'
3539'
4260'
R~ r-'--. "..-, ,~, ,,~ ",~.. ..q"
¿ !t-- II > ,~.... ~ ~, ,I' ;',. " "
" ~ '-JI f:..... ~ \~ ~ '.'~, ¡,,_:'
SEP 1 B 2001
Alaska 011 & G3S C('ln~ ':Ùl1lnllSSII-,i
I\ndl"X,?;ije
Detailed operations program-
15. Status of well classification as:
BOP sketch -
Oil-
Date approved
e to the best of my knowledge.
Service X
Gas-
Suspended -
Questions? Call Steve McKeever 265-6826
Date 18 ~ +0 I
Prepared by Sharon AlIsup-DriJke 263-4612
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so repre ,ative may witness Approval r'\°'
Plug integrity -- BOP Test - Location clearance - \. ~ l - ~ 7,J...
Mechanical Integrity Test - Subsequent fonn required 10- 4'bì ('I."," c....t:)""~ró-\C'"
Dale q !J¡C/O I
Approved by order of the Commission
Original Signed By
Cammy Uechsll
Form 10-403 Rev 06/15/88 .
ORIGINAL
Commissioner
SUBMIT IN TRIPLICATE
~
Tom Maunder dom_maunder@admin.state.ak.us>
08/13/01 02:37 PM
To: Steve McKeever/PPCO@Phillips
cc:
Subject: Re: 1 C-119 Procedure Change, Application for Sundry Permit
Steve,
We appreciate the heads up. You are correct, a fairly minor change. An HIT
does need to be done prior to beginning injection. Our Inspectors do not need
to see this one, but they do like to see an NIT after the well is warmed up
and injecting. I don't see a problem with what you propose.
Tom Haunder
Steve McKeever wrote:
> Tom-
>
> Phillips requests authorization via e-mail for a change in procedure on a
> well currentlf in progress, Well 1C-109, Permit # 201-139.
>
> We are hoping to change the permitted procedure to improve the quality of
> our cement job. The scope of change is that we are not going to do the
> required HIT tests with the rig, but will do the HIT tests after the rig
> has mo\'ed off, but prior to putting the well into service. The attached
> Word document details the procedure that was permitted and the procedure
> for which a Sundry Application will follow.
>
> Can you please review this and provide e-mail authorization for the change
> in procedure?
>
> Thanks
>
> (See attached file: lC-119 Sundry Procedure.doc)
>
> Steve HcKee~ler
>
>
>
Drilling Engineer
Phillips Alaska, Inc.
907.265.6826 office
907.265.1535 fax
907.275.0369 pager
smckeev@ppco.com
>
>
>
>
>
> "Nothing so sobers the mind as the prospect of being hanged."
> - I-lark Twain
>
>
>
------------------------------------------------------------------------
Name: 1C-119 Sundry Procedure.doc
1C-119 Sundry Procedure.doc Type: WINWOED File (application/msword)
Encoding: base64
>
>
D
10m_maunder. vcf
1 C-119: Permitted Procedure
Rig Work:
1) Excavate cellar, install cellar box, set and cement 16" conductor. Weld landing ring on
conductor.
2) MIRU Nabors Rig 245e. Install diverter and function test same.
3) Spud and directionally drill 7-7/8" hole to desired targets through West Sak intelVal. Run
MWD/LWD logging tools in drill string as required for directional monitoring and formation
data gathering.
4) Circulate and condition hole to run casing.
5) Run and cement 5-1/2" 15.5# L-80 BTCM x 3-1/2" 9.3# L-80 EUE 8rd tapered casing string
to surface. Displace cement with seawater and perform stage job or top job if required.
6) Note: 5-1/2" Port Collar to be installed @ +/- 1,000' TVD.
7) Nipple down diverter and install wellhead. Nipple up BOP stack and pressure test to 5,000
psi.
8) PU and RIH with 3-1/2" tubing to just above seal bore extension and displace well to clean
seawater.
9) Sting into seal bore extension and space out.
10) Unsting seal assembly, and freeze protect well with diesel.
11) Sting back into seal bore extension and land tubing.
12) Using diesel, pressure test tubing and annulus to 3,000 psi. Record results. Install back
pressure valve.
13)Nipple down BOP stack. Install production tree and pressure test same.
14)Secure well and release Nabors Rig 245e.
Note: A cement bond log will be run after the rig has moved off the well.
1 C-119: Proposed Procedure to improve Cement Quality
Rig Work:
1) Excavate cellar, install cellar box, set and cement 16" conductor. Weld landing ring on
conductor.
2) MIRU Nabors Rig 245e. Install diverter and function test same.
3) Spud and directionally drill 7-7/8" hole to desired targets through West Sak intelVal. Run
MWD/LWD logging tools in drill string as required for directional monitoring and formation
data gathering.
4) Circulate and condition hole to run casing.
5) Run and cement 5-1/2" 15.5# L-80 BTCM x 3-1/2" 9.3# L-80 EUE 8rd tapered casing string
to surface. Displace cement with seawater and perform stage job or top job if required.
Note: 5-1/2" Port Collar to be installed @ +/- 1,000' TVD.
6) Nipple down diverter and install wellhead. Nipple up BOP stack and pressure test to 5~OOO
psi.
7) PU and RIH with 3-1/2" tubing to just above seal bore extension and displace well to clean
seawater.
8) Sting into seal bore extension and space out.
9) Unsting seal assembly, and freeze protect well with diesel.
1 O)Sting back into seal bore extension and land tubing.
11) results. Install back pressure valve.
12) Nipple down BOP stack. Install production tree and pressure test same.
13) Using diesel, pressure test casing x tubing annulus to 500 psi for 10 minutes.
14)Secure well and release Nabors Rig 245e.
Post Rig Work:
1) Rig up and pull BPV.
2) Rig up and pressure test tubing and tubing annulus, each for 30 minutes to 3000 psi.
Record tests on chart and store copy in the well file, and transmit a copy to the Anchorage
Drilling Aide for inclusion in the Anchorage well file.
3) Rig up wireline and make a dummy run to PBTD.erun and perforate well. Logs should be
run prior to perforating well.
4) Rig up and run CBUGR/CCL logs. Run SCMT cement evaluation tool with zero pressure
on tubing and with 1000 psi on tubing.
5) Rig up and perforate well for injection.
~~~~ì :¡ !Æ~~~~~~
~II~SKA OIL AND GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
333 W. -,r" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Tom Brockway
Interim Drilling Engineering Supervisor
Phillips Alaska, Inc.
PO Box 100360
Anchorage AK 99510
Re:
Kuparuk River Unit lC-119
Phillips Alaska, lnc
PenTIit No: 201-139
Sur. Loc. 1571' FNL, 823' FWL, Sec 12, Tl1N, RIOE, UM
Btmhole Loc. 1114' FNL, 1787' FWL, Sec 11, TI1N, RI0E, UM
Dear Mr. Brockway:
Enclosed is the approved application for pennit to drill the above referenced well.
The penn it to drill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required pennitting determinations are made.
Annular disposal of drilling wastes \vill not be approved for this \vell until sufficient data is
submitted to ensure that the requirements of 20 AAC 25.080 are met. Annular disposal of
drilling waste will be contingent on obtaining a well cemented surface casing confirmed by a
valid Formation Integrity Test (FIT). Cementing records, FIT data, and any CQLs must be
subnlitted to the Commission for approval on fonn 10-403 prior to the start of disposal
operations.
Please note that any disposal of fluids generated from this drilling operation which are pumped
down the surface/production casing annulus of a well approved for annular disposal on Kuparuk
River Unit IC pad nlust comply \vith the requirements and limitations of 20 AAC 25.080.
Approval of this permit to drill does not authorize disposal of drilling waste in a volume greater
than 35,000 barrels through the annular space of a single well or to use that well for disposal
purposes for a period longer than one year.
The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035;
and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC
25.412 and 20 AAC 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test
Permit No: 201-139
Page 1 of ~
before operation, and of the BOPE test perfonned before drilling below the surface casing shoe,
must be given so that a representative of the Commission may witness the tests. Notice may be
given by contacting the Commission petroleum field inspector on the North Slope pager at
659-3607.
~
Daniel T. Seamount
Commissioner
BY ORDER OF WE COl\1lVIISSION
DATED thisÉ day of August, 2001
jjc/Enclosures
cc:
Department of Fish & Game, Habitat Section wlo encl.
Department of Environmental Conservation w/o encl.
/PHI~PS" ,I
~, ~~st~~!~~'P~~~~~d~~~
Post Office Box 100360
Anchorage,AJaska 99510-0360
Tom Brockway
Phone(907)263~135
Fax: (907) 265-1535
Email: tbrockw@ppco.com
July 10, 2001
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Suite 100
Anchorage, Alaska 99501
(907) 279-1433
Re: Application for Permit to Drill, West Sak Injector lC-119
Dear Commissioners:
Phillips Alaska, Inc. hereby applies for a Permit to Drill an onshore service well, #lC-119, an injector well
to provide pressure support for West Sak production.
Please find attached for the review of the Commission Form 10-401 and the information required by 20
ACC 25.005.
If you have any questions or require any further information, please contact me at 263-4135 or Steve
McKeever at 265-6826.
J" 17
Sincer ,'/ /~ /} .. '
/~., .'
//ij!;,1:'q'?¿:f ~~7
Tom Brockway ~
Interim Drilling Engineering Supervisor
RECEIVED
JUL 1 2 2001
Alaska Oil & Gas Cons. Commission
Anchorage
ORIG!I'\JAL
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
1a. Type 01 work: Drill b!J Redrill U
Re-entry 0 Deepen 0
2. Name 01 Operalor
Phillips Alaska, Inc.
3. Address
P.O. Box 100360 Anchorage, AK 99510-0361
4. Location 01 well at surtace
1571' FNL, 823' FWL, See 12, T11N, Rl0E, UM
At top of produclive inlerval
1142' FNL, 1989' FWL, Sec. 11, T11 N, RlOE, UM
At total depth
1114' FNL, 1787' FWL, Sec. 11, Tl1N, RlOE, UM
12. Distance to nearest property line I 13. Distance to nearest well
1787' @ TD feet 1C-117 29
16. To be completed tor deviated wells
'Kicko1t depth: 300 MD
18. Casing program
size
20 AAC 25.005
Exploratory U Stratigraphic Test LI
Development Gas 0 Single Zone 0
5. Datum elevallon (DF or KBI
RKS = 102 feet AMSL
1b. Type 01 well
Service 0
feet
6. Property Designation
ADL 25649 ALK 467
7. Unit or property Name
Kuparuk River Umt
8. Well number
1 C- 1 19
9. Approximate spud date
August3,2001
14. Number 01 acres in property
2560
hi
(
Development 011 LJ
Multiple Zone 0
10. Field and Pool
Kuparuk River Field
West Sak Oil Pool
11. Type Bond I&ee 20 ÄAC 25.02511
Statewide
Number
#59-52-180
Amount
$200,000
15. Proposed depth IMD aM TVOI
6579 ' MD I 4250 . TVD
Maximum hole angle
65 deg
17. Antícipated pressure ¡see 20 Al..c ~5,035 leli211
Maximum surface 1487 psig At total depth (TVD) 1955 psig
Setting Depth
Hole
24"
7,875"
7.875"
5,5" Csg
Specifications
Grade Coupling
H-40 Weld
L-80 STCM
L-80 EUE 8rd M
L-80 EUE 8rd M
Length
120'
5856'
682'
5856'
Top Bottom Quantity 01 Cement
MD TVD MD TVD l,include stage data,!
41.2' 41.2' 158' 158' 225 cf AS 1
41.2' 41.2' 5897' 3616' 540 sx AS III L & 340 sx Class G
5897' 3616' 6579' 4250' Tapered String - cemented above
41.2' 41,2' 5897' 3616' (Tubing String)
20. Attachments Filing lee 0 Prope y PlaiD BOP Skelch 0 Diverter Sketch 0 Drilling program0
Drilling fluid progral1}'1 0 Time vs dePth~lot Retraclion analysis 0 Seabed report 0 20 AAC 25,050 requirements ø
21, I hereby cert~~y~, th foregoing)S ~ru~ ,nd C. or 0 the best 01 my knowledge Que5('vr,s? C,;¡II Sr~I'e """cK~.;~r 2J,.682~ ,
, / /'j""~Z:/./S ' ..//:/°/
Signed " ",'" , .". I -. -:::..e-" -- :-::Þ."þ Title: ¡"rer,m Onllir,'} E"g,n~t:Jr,ng SupenMor Date
Tom 8rcrckll'ay . ¿. ",./ Pr€<p3rt:Jd by Sr€<.'e. /'o,kKe.e-I'er
Commission Use Onl~
5' c' ""3 ¿¡ I Approval date ~ \ 0'
No Mud log required
Directional survey required
5M: 0 10M;O
Casing
16"
5.5"
3.5"
3.5"
Weight
62,5#
15.5#
9.3#
9.3#
19. To be completed for Redrill, Re-entry, and Deepen Ope:ralions,
Present well condition summary
Total Depth:
measured
true vertical
Plugs (measuredl
leet
feet
E1tective Deplh:
Junk (measured,1
measured
true vertical
leet
(eel
Casing
Conductor
Surface
0
Measured depth
Length
Size Cemented
Pertoration depth:
measured
true vertical
permn Number API number
2c./ -- )" $' ~ 50-C'.2 'J - 2-
Conditions of approval Samples required 0 y'es Qg
Hydrogen sullìde measures 0 Yes ŒI No
Required working pressure lor BOPE 0 2M; J!l..3M; 0
Olher: '" \\ i: QMQ:."-\-Cy\.j~\\-\-l \Ö ~
ORIGINAL SIGNED BY
n Taylor SoomounI
fg
0
Commissioner
by order 01
the commission
Approved by
Form 10-401 Rev,12/1/8S-
OHJG'N.. L
True Vertical depth
RECEIVED
JUL 1 2 2001
Alaska Oil & Gas Cons. Commission
Anchorage
Isee cover letter
tor other requirements
0 Yes ßI No
Yes 0 No
Dale
6 I \ 0 (
Submit in triplicate
J:~
ation tor Permit to Drill. Well 1 C.119
Revision No.O
Saved: 9-Jul-Q1
Permit It - West Sak Well #1C-119
Application for Permit to Drill Document
MoximizE
Well VglUE
Table of Contents
1. Well Name ....... ........ ... ..................................... .... ............ ..........................................2
Requirements of 20 AAC 25.005 (f)..... .... '"'''''''''' """'"'''''''''''''''' '''''''''''''''''''''''''''' ........... "" ........ ......2
2. Location Summary..................... .......... ......... ...... ...................... .... ....... ....................2
Requirements of 20 AAC 25.00S(e)(2) ....... ...... ..... ....... ............ ....... ....,..... .......... ........ .......... """'" ........ 2
Requirements of 20 AAC 2S.0S0(b)............ ............., ....., ..., """""""""'"'''''''''' """",,,,, ..,.. ......... ..........3
3. Blowout Prevention Equipment Information ......................................................... 3
Requirements of 20 AAC 25.005(e)(3) ........................ ........... ............. ................... .... """"'" """'" ........3
4. Dri II i ng Hazards Information...................................... ................... .......................... 3
Requirements of 20 AAC 25.005 (e)(4) ..................................................................................................3
5. Procedure for Conducting Formation Integrity Tests ........................................... 3
Requirements of 20 AAC 25.005 (e)(5) ..................................................................................................3
6. Casing and Cementing Program.............................................................................4
Requirements of 20 AAC 25.005(c)(6) ................................................................................................... 4
7. Diverter System Information ........... ........... ............. ...................... ...................... ....4
Requirements of 20 AAC 25.005(e)(7) .. ........,.. ............................................. ..... .................. ...............,.. 4
8. Drill i ng FI uid Program ............................................................................................. 5
Requirements of 20 AAC 25.005(e)(B) ..... ......... .......... ............ "."" """""'''''' .... """.",,, ..... ................,.. 5
9. Abnormally Pressured Formation Information ......................................................5
Requirements of 20 AAC 25.005 (e)(9) ..................................................................................................5
10. Seismic Analysis..... ........... ...... ................................................................................ 5
Requirements of 20 AAC 25.005 (e)(10) ................................................................................................ 5
11. Seabed Condition Analysis .....................................................................................5
Requirements of 20 AAC 25.005 (e)(11) ................................................................................................5
12. Evidence of Bondi ng..................................... ........ ........................... ........... .... ......... 6
Requirements of 20 AAC 25.005 (e)(12) . "'"'''''''''''''' "'"'''''''''''''''''''''''''''''''''' ...... ............ ...................6
0 1IG"Nj~
1C-119 PERMIT IT. DOC
Page 1 of 7
Printed: 9-Jul-01
4,
ation for Permit to Drill. Well 1 C.1 1 9
Revision No.O
Saved: 9-Jul-01
13. Proposed Dri II i ng Program................................. ............................... ...... ... ............. 6
Requirements of 20 AAC 25.005 (c)(13) ................................................................................................ 6
14. Discussion of Mud and Cuttings Disposal and Annular Disposal....................... 7
Requirements of 20 AAC 25.005 (c)(14) ...... ....,............... ................................... ..... .............................. 7
15. Attachments ......... ... ............................. ......................................................... ...... ..... 7
Attachment 1 Directional Plan....... ......................,............... ...-.................................. .............................. 7
Attachment 2 Drilling Hazards Summary............................................................................................... 7
Attachment 3 Cement Loads and CemCADE Summary. ......................................................................7
Attachment 4 Well Schematic. ... """"'"'''''''''' ......., """'" ............ ...................... .................. ..............".. 7
1. Well Name
Requirements of 20 AAC 25.005 (f)
EJd} a'ell fIIust be Id(~n{¡ii(!d l:w a umL('lIe n:mli..' ¡jc~iÿnat£'ä by tlle o{)i...'lafcx df/li .:1 U/7/(/"£' API numver as'5lflflCd bV the' L:Olllnl/SSllYl
under 20 AAC 25.0<lO(b). For ð WI..:/I mth fI1ulople Vl/c..'11 bldncllò.. ed.::h brJflc!1 must sirmlJdr be ¡dc..YltI!lcd b,~ a umquc namc dOll API
numtJä b.~' 3ddl/7£} a suifi,'( to tilt? flame dC5lgll.Jtryj fnr tll(~ wt'll hI- the o,n(~l<ìttll and to tile numbtY .:7..":;5JÇl/7,:d fa f!h: I rell by the
,-ommIS5ID{/.
The well for which this Application is submitted will be designated as lC-119.
2. Location Summary
Requirements of 20 AAC 25.005(c)(2)
An apfJ/¡cât~ÓII ((.Ir a Permit to On/I flI/):,{ Dr: dŒ"OfT7pnllirä bv ea,f) 01' till? '~ìll(Jn'/f7q Itellls, t")(Cr:?pt '¡ìf an Hem alrt:>adr (U} fit,,:; ¡ ¡11th tl~e
c()mmi~"SI()fI and Identdié:'o' In !he apphca{¡on,
(/) a pl.')! ,de17tJ/\.'lllr} the prO/Jerty and the pmpc:rtv's on'tlt'r.'>' ânci SIIOI h'n9
(A)tI7e coon1llk1tt.'::, of the prooo5cd 1(}(..-d{¡oIJ of the u'ell elf the surtJÚ~~ .Jt the tG~D of c~dch ùp/Cctwe fÓrtliJtlor~ and at tOt.;i! {It.~[jt/J.
rdt.'/(IJ7('t'[f to (]ol't.'Inmenlal :;L'ctwn /mr..'5.
(6j tIlt.' c()oldtilates of tile {.1fiJposed /ùG:7tItJ/7 olt/Je H.'cll at tile .':;lJrf,-71:e, ¡é.'fi'fel7ccd to tile .-;t.:1t..7 pJ~7ne C(I\"JI",ltn..'i!t' System tOf tillS
state as ma¡"nlam¡:d L'V tilt' N.-1tlO/I.JI GCI7drVIC .'illflll:V tn the Natlonal Ou:oamc dnd ;1rmo~ph('nc Adml;'uslrðtion:
(C) tlfe proposed depth of t/7/' II/ell at tllr} top of er1ä7 oL;/Ô'lll,-e lormatlon and at total depth;
Location at Surface
NGS Coordinates
Northings: 5,968,664.0 Eastings: 561,830.6
11571' FNL, 823' FWL, See 12, T11N, Rl0E, UM
RKB Elevation
Pad Elevation
102.0' AMSL
60.8' AMSL
Location at Top of
Productive Interval
(West Sak "D" Sand)
NGS Coordinates
Northings: 5,969,060
1142' FNL, 1989' FWL, Section 11, T11N, R10E, UM
Eastings: 557,713
Measured Depth, RKB:
Total Vertical Depth, RKB:
Total Vertical Depth! 55:
5997
3706
3604
Location at Total Depth
NGS Coordinates
Northings: 5,969,087 Eastings: 557,511
1114' FNL,
1787' FWL, Section 11, TllN, RI0E, UM
Measured Depth! RKB: 6579
Total Vertical Depth, RKB: 4250
Total Vertical Depth! 55: 4148
ân(/
V ,-. , \.;¡ , . IJ ,-- II ~
1C-119 PERMIT IT. DOC
Page 201 ï
Printed: 9-Jul-01
Ai
r
Jtion for Permit to Dnll, We1l1C-119
Revision No.O
Saved: 9-Jul-01
(D) Orl12¡ If7forrnabon re>quireû t,¡, ]0 A4C 25,050(DJ,'
Requirements of 20 AAC 25.050(b)
It a 1'.'21115 ti} be IIltentlona/iv dé'v'lat2.1, tl12 applIcatIOn tÒr.3 Pern7lt to Dn..l (Form 10-401) must
(1) mclude a plat, dral'\ln to a 5U1table scale, 5hQ¡~'h7g tne path of tne proposed 1~'é'/ltJore, lficludmg all aq/acenr II'e/;,Öùrr:s mtl71l7 .lOCI
fé'et of any portion 0; the proposed Ive,~~'
Please see Attachment 1: Directional Plan
and
(2) rcr aN n'e>I/s mt/7/n 200 l2et of (17e proposed wè'/Ibore
(A) lIst the names of tl7e operators 0; t!lose H'211s, to tIle> t.'xtent t!lat tl)OS2 namE'S arC' knmll'fl or LllScol/erable 117 pUNiC r:2corLls,
and sl70n' t/Jat pac/J named ope>rator has been furmsl1e>d a copy of tl7e apph'ca{lOn bll' ú::rtllÎed m;/I(: or
(8) state> that the applicant is tl¡e onlv afTected olvner.
The Applicant is the only affected owner.
3. Blowout Prevention Equipment Information
Requirements of 20 AAC 25.005(c)(3)
4n apphcatlOf7 for à Pc'lflut to DIlII must Lit.' i/('"LiJmpal1lc.yj b).' c:.'ach of the.' !d/ol1'''¡¡U ¡{cms, ('xcept fOf an Item all/ladvon file With (he
corrJf7¡/5"s/¡}(] and Identified II' tI)C dPP/Ií..3tiùn:
(J) a dia~7ram and df'5Cllptlon of (lie hlOlL'Dut prc:L'entll'JlI rql/lpmc;'nt (BOPE) as req/1l{¡~d ¿)jI 20 AAC 25.03:;. 2() A.4C 25.036, t'Y 20
AIIC ..:'5.0J.~ as al-~Dlicr7ble:
Please see "Diagram and Description of the Blowout Prevention Equipment for Nabors Rig 245e", placed
on file with the Commission with the Application for Permit to Drill for welllC-133, dated April 26th, 2001.
4. Drilling Hazards Information
Requirements of 20 AAC 25.005 (c)(4)
An dppllc3liûn for ä Pefll1lt 10 Dnll milS! t>i:! nn'()rr~{lall!pJ by each of' tll~ folk'u'lfJU Items; r? \'c,;;,pf f( 'r an it~m alrt!t:h1I' L)fI .rï/c> nit/¡ tllr=
(,(,'mITII:"~':;lOfI dnd Idð,Jf¡/ii:d I/J {/It:: dpplll a{¡ùf}:
el) ¡n/U/fnatlL1l7 on äll//m~l n.i'ZJrâs~ If.Ic/uI.Jmlj
¡;'V tlie 171dX/fIWm dOt1'l711t)/e prC.'ssUlc tl?':J! nIJY DC cnco/.lnt(!rc.'~,t. enterl,:f used to det(.ytlliflt.' it, 3m} nlJ)(/fIwm pLJh'/7t/d/ ~urtc1C(,
f!fc-::5SUle !.Hscd 01/ a Il7r...Y!7aJlL' qtarf/(~nt;
The expected reservoir pressures in the West Sak sands in the lC pad area vary from 0.43 to 0.46 psi/ft,
or 8.2 to 8.8 ppg EMW (equivalent mud weight). These are pressures obtained from actual well test data
from the nearby WS1-0l well.
The maximum potential surface pressue (MPSP) based on the above maximum pressure gradient, a
methane gradient (0.11) and the vertical depth of the expected base of the West Sak formation is 1487
psi, calculated thusly:
MPSP =(4250 ft)(0.46 - 0.11 psi/ft)
=1487 psi
(8) data ('}.07 pr}(r:'llt/~71 gds 7cn2:>,'
The well bore is not expected to penetrate any gas zones.
,:mli
(C) ädtd C()nct!rnmÿ pmr3lltJ:-!1 í. aUSi:!S of hC'lt3 problems sucll .::1.<'; atmo/7ì1al.~y £N'o-pn:s...:;ured strdtd, k~'st etrl:"lIlalli.)f) .:Of Ii:':>, dnd /.Cfll.:-')-
IIl..,t IJdL'c.' :J propensIty lor Œflc(c:ntldl S[ir:/(¡'tJ~7;
Please see Attachment 2: 1C-119 Drilling Hazards Summary.
5. Procedure for Conducting Formation Integrity Tests
Requirements of 20 AAC 25.005 (c)(5)
All r'lf.'plicatloll tÒr a Permit to f)1I.!1 must D('~ .:1Ccom/-,a/1/c"d LW (la()1 of tho" (01/011'/11<7 dC/ì7s, {')..ú~ot f(7!" t7l1ltem alreadv un rih~ W,I(I¡ It1C
COfllllll,55¡(}1I anä lt1entlfìc:d In tilt.' .:l,Dpllcatlon:
(5).'] ci6al,i)/¡~JIi o.f /11t~ pmC2(1ure IÒr ¡-onducfm(J f()rmat.'(!lI Ù)te.9/~l}' te:~-¡s, .'l;'; r('((UIf/>j undt'?'r ?O A4C .?SO}{}(O,
1 C-119 PERMIT IT. DOC
0) G N J Page30f7
.1 f ~ Printed: 9-Jul-01
ß:
ation for Permit to Dnll. Well 1 C-119
Revision No.O
Saved: 9-Jul-01
As the well will be completed with a single casing string that will not be drilled out, no formation integrity
tests are planned. In the unlikely event that it does become necessary to drill out a casing string with
blowout prevention equipment installed, a formation integrity test will be performed in accordance with
the LOT / FIT procedure, that Phillips Alaska has on file with the Commission.
6. Casing and Cementing Program
Requirements of 20 AAC 25.005(~){6)
An applicatIon for a Pem7tt to Onll must be accompanied L'v eacll of tIle 1(,J110I\''/f79 (rems~ excepr /;x an Item alreaJy on file wtfh the
comml5Slon and Identtried in the a/Jpi/cation:
(6) a complett"' proposë'd casmg and cement:nq program as reqUlreu by 20 A4C 25.0JD- and a de5ulptlOn C'l arw slotted Imel, rrë'-
pe¡(orated Imer. or scrë'en to be :n5tallec~.
Casinq and Cementinq PrOqram
Hole Top Btm
CsgfTbg Size Weight Length MD/TVD MDíTVD
OD (in) (in) (Ib/ft) Grade Connection (to (tt) (ft)
16 24 62.5 H-40 Welded 117 41/41 158 / 158
5-1/2 7-7/8 15.5 L-80 BTC,AB 5856 41 / 41 5897 / 3616
Modified
3-1/2 7-7/8 9.3 L-80 EUE 8rd, 682 5897 / 3616 6578/4249
AB
Modified
See also Attachment 3: Cement Loads and CemCADE Summary.
Cement Program
Cemented to
surface with
225 cf
ArcticSet 1
Cemented to
Surface with
540 sx ASLite
Lead, 340 sx
Class G Tail
7. Diverter System Information
Requirements of 20 AAC 25.005(c)(7)
An appllca[¡(){I for d PernN! hJ DoH must be aCC()(J1.Ddflli...yj bv cadi ol ttle /o/lc~I'l'm} dem5:, (~'I((i.'pt ror dO Iiem d/rr-',kf¡¡ on tile ;'J!i' tl7e
(~ùmmIS5IOn dnd IrJenf¡fïed m tl7e app/!(-atlon:
(,~) a d,aqmm and (k~5alptl(Jn ot fl](? dwerf¿.y ,<;¡:St('lrl .1<; r(~t7U1("t:."'d hI¡ 20 AAC 2.'i.OJS, ,'Jnles~ tIlls re<7/J(f,.~rncnr IS wawc¡1 ty t/lr~
C<)fnrì7loj~'IiJl} unlit'r /0 AAC .~S,Il}S(/I)(/):
Please see "Diagram And Description of the Diverter System For Nabors Rig 245e", placed on file with
the Commission with the Application for Permit to Drill for weIl1C-133, dated April 26th, 2001.
v,., "'. ¡ - lí"16.
1C-119 PERMIT IT. DOC
Page 40f 7
Printed: 9-Jul-O 1
i
,atlon for Permit to Drill. We1l1C-119
Revision No,Q
Saved: 9-Jul-01
8. Drilling Fluid Program
Requirements of 20 AAC 25.005(c)(B)
An applicatIon lor a Penmt to Doll must L1t: accompanred é,v ea..-t¡ 0." tne fiJllowmg Items, except for an ¡fem alread.~' (jli fil2 ¡'¡lIft¡ the
commIsSIon and Iden!tf7ed In the appltcatlon:
(8) a dnl/mg fluId program, lncludmg a diagram and descnpr:o!7 of the dnllmq r7U1d system, as re,7ulred bv 20 MC 25.0J3:
Drilling will be done with a bentonite slurry having the following properties over the listed intervals:
Spud to Base of Permafrost Base of Permafros to Total Depth
Initial Value Fmal Value Initial Value Final Value
8.5 <9.4 <9.4* <9.4*
150-200 150-200 150 75
Density (ppg)
Funnel Viscosity
(seconds)
Yield Point
(cP)
Plastic Viscostiy
(lb/100 sf)
70 second Gel
Strength (lb/100 sf)
10 minute Gel
- Strength (lb/100 sf)
pH
API Filtrate(cc)
Solids (O~)
30-60 30-60 20-40 18- 30
8-15 11- 22 15-30 15- 30
10-30 10-25 10-25 10-25
25-55 25-55 20-40 20-40
8-9 8-9 8-9 8-9
8-15 6 5-6 5-6
5-8 5-8 5-8 6-11
*9.8 PPQ if hydrates are encountered
Please see "Diagram of Mud System, Nabors Rig 245e", placed on file with the Commission with the
Application for Permit to Drill for we1l1C-133, dated April 26th, 2001.
This drilling fluid system of Nabors Rig 245e consists of: (3) Continental Emsco FB-1600 Mud Pumps,
Steel Mud pits with 1100 barrel capacity, Pill Pit, Trip Tank, (3) Derrick Flo-line Shale Shakers (rated at
600 gpm), Brandt Model SRS-2 Desander, Derrick Model 58S Mud Cleaner, (2) Alpha-Laval Model 418-VT-
5 Centrifuges, Degassers, PVT System with visual and audio alarms, Trip Tank, Flow Sensor, and Fluid
Agitators.
Drilling fluid practices will be in accordance with appropriate regulations stated in 20 MC 25.033.
9. Abnormally Pressured Formation Information
Requirements of 20 AAC 25.005 (c)(9)
An app.llc:1tIO/1 fDr r7 P('?rrmt to DIIlI must {lr? acC,ìmpa/l/{'rJ'Lw ,",JI,::I'1 (ì( t/k~ .fo/k}1 ¡':l1q Items.. c.\'n':~Dt riJr an item aJread,i" Dn rll¡~ tVlrll the
cornmls,-:ion and lär3n[tiÎl:'d III tilt:?' dppl,cðf¡"on:
(~~) (or.3n p~plora/i!fV 0-' ,<::t':~tlqra{Jlu{~ te.çt ,¡veil, c7 f~~bul:]IIi.;lÌ ,r::i't/m..} ,Jut t/lr:? df~Otl,1:;,' o(pr2(/icled a/)r¡(}1Ï1I.~/1.~' pc:.o"/Jressurr;>o' itrata 3:-õ
rt'ljUili::'d L,~ 20 AAC ?5.03J{t);
Not applicable: Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
Requirements of 20 AAC 25.005 (c)(10)
An applicdtlofl tor a PLumt ro Dnll mllst bc.." aC':'rJmpa/1/r'..'d ,bJ.' (.Idch 0/ rh¿,' l01Ioll'/!7flltcms: ex.:.-t.-y:..,{ lOI an ItC/1/ "k(,i1{"~~' on rile wlt/7 tile
COl7lllllS5IÒ¡1 dnd Idl..'ntl/il..:l1/f./ the' apP/lcatlOn:
(10) for an e>.pl(}ratorv (}r 5trat'~7/Jp.t1IC f¡;sr ¡t'c/I, .J seismic œttactlOf1 01 rdlc..Ytlon iJnalY5o'5 as rcqullcd b~ 20 MC 25.(161'(.:7),'
Not applicable: Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
Requirements of 20 AAC 25.005 (c)(11)
An c7pDlicatlon tQI a Permit (,7 Drti~ mlJst be a. -compamed t'y L'.:1c/7 or" the /'!//[!t'I:ln~7 Ih:m5, ¿')¡cept lÒr an I[¡~m c7it;'atlV on tile I'i"tfh tile
¡,~(;mml::;sir)fl and Identit7eif IlJ the" f7pp¡ïcr7liO/1'
1C-119 PERMIT IT. DOC
UH ,~' I ¡ Page50f7
I \.A IIV Ii L Printed: 9-Juf-01
A,
ation for Permit to Dnll, Well 1 C-119
Revision No.O
Saved: 9-Jul-01
(11) f.:x a ~.'el'l.:kll/ed frDm an OffS170r2 platfot¡71, n?oL¡,/e tJort~m¡-,'ounc1ed 5tru..:ture, ,IaCk-i.:p og, or t7o.3t,n;; (J(lI/¡n~7 ~e55e/. dn .3fi3lv'S6
of 5eaL~ cDndit/orF as reqi/lre.1 by 20 AAC 25,06I(!;J),'
Not applicable: Application is not for an offshore well.
12. Evidence of Bonding
Requirements of 20 AAC 25.005 (c)(12)
An appIJcatlOn for a PermIt to Dnll must De accompan:eä by eacl7 of the ((.lrlop¡rng Items, except ror Bn Item alrr::adv on rile 1~,¡{11 the
ccmmrs...C;¡(1n and rdentlfied m tl'ìe applrcatlOn:
(12) eviäence snowmg t/lat the reqUirements ot 20 MC 25. 025 ¡' BDnd(n9)h.:1~'é! L'een më'(:
Evidence of bonding for Phillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
Requirements of 20 AAC 25.005 (c)(13)
An applrcatlon ro,'" a Permrt to Drrll m!.i.';! l1t? accompanred b,v each ol tile following ¡ferns~ ex¡:wH for an item c7lrèòdr on frlr? ¡'viti? th2
cornmiS5rcn .3f1d ¡Oentrfi:?d rn t/lr3 applrcarion,
The proposed drilling program is listed below. Please refer as well to Attachment 4, Well Schematic.
1. Excavate cellar, install cellar box, set and cement 16" conductor. Weld landing ring on conductor.
2. MIRU Nabors Rig 245e. Install diverter and function test same.
3. Spud and directionally drill 7-7/8" hole to desired targets through West Sak interval. Run
MWO/LWO logging tools in drill string as required for directional monitoring and formation data
gathering.
4. Circulate and condition hole to run casing.
5. Run and cement 5-1/2" 15.5# L-80 BTCM x 3-1/2" 9.3# L-80 EUE 8rd tapered casing string to
surface. Displace cement with seawater and perform stage job or top job if required.
Note: 5-1/2" Port Collar to be installed @ +/- 1,000' TVO.
6. Nipple down diverter and install wellhead. Nipple up BOP stack and pressure test to 5,000 psi.
7. PU and RIH with 3-1/2" tubing to just above seal bore extension and displace well to clean
seawater.
8. Sting into seal bore extension and space out.
9. Unsting seal assembly, and freeze protect well with diesel.
10. Sting back into seal bore extension and land tubing.
11. Using diesel, pressure test tubing and annulus to 3,000 psi. Record results. Install back pressure
valve.
12. Nipple down BOP stack. Install production tree and pressure test same.
13. Secure well and release Nabors Rig 245e.
Note: A cement bond log will be run after the rig has moved off the well.
1C-119 PERMIT IT. DOC
0 ) 'G NA Page6o/7
, 1 , .. Printed: 9-Jul-01
A',
3tion for Permit to Drill. Well 1 C-119
Revision No.O
Saved: 9-Jul-01
14. Discussion of Mud and Cuttings Disposal and Annular Disposal
Requirements of 20 AAC 25.005 (c)(14)
An applIcatIOn lor a PermIt tC' Dnll mush.- be ac':ùmçai7ted b},' eacl¡ of the ii."lIOl~'in[} Items. excepr .ror an dem a/read}' en file WI{h rhe
CDmmJ55tOn and IdenMied 111 the apo/,catlon:
(14) a general de5cr~Dlion of ho~~' [/7e operator p..:::¡ns to dispose of anlllng mud and cuttmgs and a staremr?nt of w/'7erher {i)i'
C'peraror rntenäs {O rô7uest auU70rrzatlOn under 20 MC 25.080 for at? annul a, disposal operatlDn m the H'r:II.;
Waste fluids generated during the drilling process will be disposed of either by pumping authorized fluids
into a permitted annulus on lC pad, or by hauling the fluids to a KRU Class II disposal well. All cuttings
generated will be either stored temporarily on site or hauled to the Prudhoe Bay Field for temporary
storage and eventual processing for injection down an approved disposal well.
Phillips Alaska does not intend to request authorization for the use of this well for annular disposal
operations.
15. Attachments
Attachment 1 Directional Plan (14 pages)
Attachment 2 Drilling Hazards Summary (1 page)
Attachment 3 Cement Loads and CemCADE Summary (1 page)
Attachment 4 Well Schematic. (1 page)
1 C-119 PERMIT IT. DOC
0 1 G I V'l Page7of7
. 1 , If.. Printed: 9-JIJ/-O 1
i
0 - Ä"
- ~
2¿Ü -
Sol'I:' -
"'6(1 -
1 (¡~(¡ -
1300 -
..--..
-
Q) , :'6(:'-
Q)
'+-
'-"'"
..c 18.2':'-
-
c..
Q)
0
2060
0
U
- L ~~i) -
L
Q)
>
Q) ¿tÜÜ
~
L
I-
le.~C' -
312(' -
3;,öÜ -
~t,"¡L' -
3'~(U:' -
..¡, ¿C'-
"¡"¡.iC' -
Phillips ~~laska, Inc.
¡ ':''''''0 c, ' .:" For: S McKeever
; Dot. ..'~~rl'.:J .".-~-1vj'
I "'Co' RerI18."I:' " ' Hi) "8'"'1001'1 '4
C->,,'O "0'" ..'. . '.., '0'0,"0"(0 ,,,, ,,,"
\'''" '1"",,0' t..,,,. 0,. '.¡"j.B 'u2' I~-;'O~(\
I INT~
Structure: Pad 1 C
Well: 119
F;eld : Kuparul< River Unit
Locat;on : North Slope, Alaska I
¡:;'-:8 £L£'.,HI':,tJ. 102
275. 99 AZI~IUTH
4193' (TO TARGET)
~û¡:.
,3..ÙCI
1II""PI\Jnr;- Of Prüp,:.sûl"""
. 6.I:q)
II 9 (ìD
~ ¡".IX'
~
\
. 1,~ -e,
~2 89
I:'L': 3.0C' deg p..;,. , ,,')û t t
5Eç,r, i",rr.
;:- 33
DLS. SI,)CI ')€"Y p~r lÜü 11
31 Ç¡,;.
'... 3b.t.,3
" ..¡ 1.;,9
"'-.. "¡6.19
'", 51 e'L
''', ::.') 88
""..,,,-,, EC,,:
"............,
'....
'-...........
-..............,
-'............,
-"""""'-""""""
"~ ïc.¡jl"l~,
"
-,
'.......
.......................
'............
- - .......................
t;eg,r, L'r'j¡j '-.. --,
",
"-,
, '>0..,
"......
T.:,~, Ij,~r,,~ C ""
50S€' P",,',,-,ofr,:,s l
l\IAXIMU~l ANGLE
65.22 DEG
~~. ~I('
S'" :'(1
~,4 ~,Ü
~I 1 ::'1:'
-J.ð :,1:'
-1':..51:1
~:;. 51:1
ijç, ')4'-'", 8
T,:,ç, I:I,-:¡,-,,,, :..
. K 1:
\: IJc::;n,~ \~ 0 Pt
T"D \1\/ :.Jk ~:..
-8
1..,-1
i,)r9r: I I.., 5 £1:'(
TARGET ANGLE
20 DEG
b.~::-:: \\' ::'.JI.
TL' - I:O'::lr,,~ Pt
261j
S21:1
""51J
, I~I~(I
131:")
I St..:1
1 ~.2('
;:081)
:: :541:1
¿ f.,1)<j
2B¿l'
~. I ¿I)
~3t.(1
3€...J,:,
Vertical Section (feet) - >
Azimuth 275.99 with reference 0.00 N, 0.00 E from slot ,# 119
0= ,'GJlVl-
~
~
~
C'L~" 31:,1) .:;JE'J ç..;¡, 11:":1 rl
"'"
.3'~ ~I:'
",
;.ç. ~ I:,
3~.'~(t
'"
~,C'. ::.LI
2 ""'.'~O
~;:
~
\
\
"
2..¡ :.1:1
21 :.1:,
1..,1
,;,..'''''
!,'~C'I)
~4 ::¿I:I
..:¡ 16,:,
a
=0
..........
~
---
~
........
('f',,",IN t, I,"..:r.
for: S McKE'E'\er
01:;1'; ,.r..:'.IIE1]
24-u..r,-~o.:'1
~I.:I ¡;~'.:re'-,,:'" ., 119 H..C:~~.. '4
(.;'C,',]"'.':'I-:" ...r.: ,", IE"r 1'F..'".e,":.; ~I,:I '11':'
.fiJ(l
iruf.' "'''''.,;Cl (\f.'lt.~ c.'~ .'f'-="",-,,:~ F.l"e IÜ~
.¡¡.
BAlCER
HUGHES
1i";T[()
.3800
~20(1
40('~'
~~(IO
~400
,C;':~~:: ð,,'I,,\é, ':.'
<) ~P .~~ \~ ({-' \\J '¡- '<> c
"/ ""~r, ~ ~ -+- ~"')6;") ~,)
L4---l-"C~¿¡~~c~~,~/)~
~\ /~
'". .----,/
P 11 i 11 ips A 1 a s l( a , 111 C .
Struc I...re : Pod 1 C
Well: 119
f;eld : KlIporllk ~iYer Unil
Locolion : North Slope, Alosko I
('/-24' tI
': - West ( feet)
,HOÜ
~.20(J
.:.úlJ(1
~'8[i(1
24('0
22(i(¡
2000
1~ÜO
1600
1400
1200
1000
80('
2600
275.99 AZIMUTH
419:3' (TO TARGET)
...PltJnë .)f PrÜ¡)t:,:':'JI...
,
TRUE
I 11 \ 4ff1F; 'i~~: ~ T~~;. f"V11. I
I '::'[C 1 1, Tilt f': 1 ܣ
¡ TAt=r.~ET '-1,:"':"~TI(¡tJ I
I 1.)4' ft JL. I ~n¿' f~/L
':£C. 11, T 1 1 r'l, [;'1 i)[
I TOP W :,':'1' 0 uX't. TI(¡r I
11.1-' ¡:-t'llL 1 '1i'.~' t='WI
S(( 11, h l-tJ-. 1<11)(
IPHI~LlP~'
~
~
éOO
200
~'(}J
0
400
- 12')0
- IDOC!
8~")
fOO
I '
400 Z
0
:1
2Crü ::r
,,;,::f":' ..........
(, -
,')) CD
'?J~ ° ~
..-/.,fI!j ~~ '--""
,§)
1.-- - £(IÜ
.HjÙ
- f,O'j
800
:: L!h'fA( f t")':.~T',)N.
1~,!1' rrn, 82Y n~'l
S[I~ I~, TllrJ. F:10E
c
::x:r
----.,
~.
----
~
r--
(r¡;,:;I":,] [., r;..,~"
For: S MeKee\'er
0':.1'; il(II,'.J ':.4 -LL:'t -ll.")1
J:.L'JI t:;"I(oI'l?f'"..:,:: .<; 119 '.",r; ..:.r. "
C.:.:"." r""l~ .:or,.: ,", I~.;I ',:''::'t .,:-:: "Iul '110;.
llùf. V,,;"'Cul I~Dlr.i. Oil: '!C"'E',::r,,:f. tfl(t3 1(12'" (U-~4~.£)
~ii.
BAIŒII
HUGHES
rr.nl)
P 11 i II ips A I ask a , 111 C .
Slruclure : Pad IC
Well: 119
"ield : Y.uparuk Ri-er Unil lacolõan: Norlh Slope, Alaska
==
--
--
F1J R (=~ ~= ~ II E
-----
Po;nt -----
tv10
f<OF'
::;.(10.00
E:egin Tur-n
:300,00
Et)C
1891.6 ¡
E: I] S e P e rrll (] f r- 0 -:::: t
2220.40
Top K 15
Begin [''-c,p
3456.2.3
4642.5,?¡
Top Uljnu C
52,'32.66
Tüf=" Ugnu B
5642.;32
T () P L.I gnu ,6
:)690.15
1< I ,:'
":' 8 7 ,~;,() 0
t=ù:::ing X/C) F't
Top W ':;ok 0
5897.44
5997.44
c
604 1 ,2i)
8
60E;2,92
64
6100. (:::,(3
To r-'~et,.'.~ 3, /toe
6149.86
" ,-)
''-\L
622=j.4.i
,è., 1
6,~12S. i~=)
eo>: \'\' ':;,':J~,
(~J--124. ~2
TD - (,(]~'inq F'~.
6:¡ ~,3.Ó~,
nc
0.00
15.00
c'r:: ì.'
0 -'.L.!..
6=.,,22
65.22
t")::..22
46.02
,35.2 ']
j.3.7J
28.16
27,:'"
24.,5~
2.3.26
2~'.61
21.4C:,
20,OU
20.(;()
2C).Ol.i
2CI.(/O
:2 (.i . (I ()
(~:: ~:~=) ~:\,,:~ hi"j E f""'~,J ~
25EJ.OO
236,00
¿'77.99
277,99
~7:.9q
277.9'~
~ 7 7.99
277.9S'1
277.9'~
27:'.99
¡"'"':.9/j
¿'¡'.99
27'7.99
277.99
2;--;-,99
2'7.99
2~ì!.99
2¡~,~09
.2 -; -;-' . ~j ']
.2 :' 7 .'~¡ ';1
Oir
TVD
~'oo,oo
794.,31
161.3.22
1751,00
2.269.00
2766.21
,3126.00
:" 3 9 S,¡ . (10
,3438.00
?1:,9SJ.OCJ
361 f, 1 9
~ 706,00
.) -; 4C.O(.1
:; 766,00
3:301.00
,?,84 7.(¡()
:. S1 I ,::;. 00
40 1 ~uJtJ
-+ 1 (J:=:) ,00
4241~j,9.3
[=" ,=,
I) /'~'" ¡ Jé'-:,~~
LJ}==4. ! 1\\
[\Jorth
0.00
- :)6..39
-47..36
-~,.87
1:-,0.07
299,7E,
.3:- 2 .84
40:), .38
409,10
422.~A
42.3.80
429,91
4:)2.3:
4':,),5:)
4 ~I:' . :'1 2
4-3'7.94
44 I, :'.:'
446.44
-1- ~ìl=I, 9~1
4~,E~. :,=.
Eost
0.00
- ~I:J. 9:)
-712.41
- 1 007. 9 7
-21'] 9.16
-318:,,74
- 3706.46
-39,:)8.29
- 3964.:33
- 4060, 5.5
- 4069. =,3
- 4 1 ] ~" OS
-413(1,62
-4139.00
- 4 1 5.3.0,3
-41 ~O.28
-41'~¡5.87
-4:;",)().éi5
-426,3.27
-4,~, I =!.:) 1
~~HILLlP5'~
TfTja
~
= = = ====0
V. Sect
49,86
703.57
1001.8:,
212,3.25
3199.63
,3 "72 :¡, 1 .3
.39=,9.09
3985.88
40e? .46
4(J91.~,4
41 ':,5.46
41 =1,:), ] r.J
4161.64
41 -:'~,.81
41(~i.:,,21
421',:1.(14
41=)4..32
422, - ,(It;
4 ~, .:', '~1. :' 8
0,00
Deg/1OO
0,00
:1.00
5.00
0.00
0.00
0.00
.3.00
3.00
~I.OO
.3.00
.3.00
':'.O(J
:,.00
3.00
,3.00
,). ()CJ
O. (JC;
0.00
(j I~I()
-_---.i~..QQ
Grid Repan
I of-J
Philltps Al.:;.=~:':;, Inc.
t?õd lC
119
=:1',)1: ~113
Kuparuk Pi~er Unit
II,:, r 1:h S 1.:.p", , .;1 ",.,;, K",
P F. ,) I? ':' :: ,; L LIS T I II G
by
E'ako:-r Hu-;TIES I[IT[':'
'i,:,ur ro:-t : 111 Per.,; ie,n ~.J
Our r",f : prop.J3aO
Lico:-n.,;ë :
D",1:¿ prin1:ed : ¿.J -Ila~'-:")(Il
Dat~ çr~~t~d: 5-Jan-2001
Last r';',"l:ed . ::j-I.1~J'-':'(II:'1
Fi~ld ~s c~ntred on n-(I 16 1~.5~¿,w15C' 5 56.5]6
£trLl-:t'Jro:- is c.;!ntr",d ,:,n n~'I) 19 ~5,l~'j,',;1.J~ :;,) lSt,12..J
Slot loca1:ion i.= n70 1~ 29, "22,wl.J9 2~ 55.102
Slo1: Grid -:o0rdina1:Bs are IJ 596~66.J,020 E 561~¿9.30~
S10~ 1,.=a1 cc,oc,jinate& aT¿ 15:1.00 S ~~3.01:1 E
Prc.j.;.Gl:i,:,n t:/1:'¿: ",lazka - :;:,:,n.: .J, S¡:,her,:..id: ':'larko:- - l~¿,¿,
E~ ferënc-= 1J.:,r u., is True H:'!"1:n
OHJ(:i, , 'V¡.
..
Grid Report
2 of 4
Fhi111pS Alaska, Inc,
P3.dlC,ll';¡
f:uparuL: Fi':-:r Unlt,!J.:,rth $1.:,p.;" Mlaska
PR')PC'SAL U3TIrJ'':: F';¡9'" 1
Your ref: 119 ~erzion #~
La3~ r-:~is~d : 2]-Ma~-:001
Heasure.j Inçlin Azimuth Tr U€ '~'~r t F. E eTA IJ ,:; U L M F. ,; ft, I 0 r::C)ORDS G E 0 G F A PHI C
J)'Õpth rl~gra:€s Degrees Depth C ,~, [0 F D I !J ATE S E'3.stin'~ JI.:,rthing C ':' .:' F D I II ATE S
0.00 .) . (1(1 236 00 (I. C'O C' . 1)1)11 O.OOE 561829.30 S96~1)¿'~.Ü~ n71) 19 ::"~."'2 IrJU9'::~ 55. H'
300.ÜO I). (II) ~3t).IJO 300.00 (I. I)')IJ Ü. Ol'E %H2? 30 596~ ¿,6'¡ . (I;:' n701',':::9,:2 '.d'¡'~ 2';' 55.10
..)0(1.0(1 3.00 236.00 39? ~5 1. HS ;.:: . 1 "71'1 :,6lE,27.1S 5;'6.:662. 5..J nil) 1St '::9.71 wU9 29 55.1'
500.(10 t.. (II) 236.ÜO .1 9'~ , 6] 5.'?5S S? 6 7\11 561820.6~ 59f5865?, 1 I) n'O 19 29 ~6 '",,1-19 :";. 5::,.~6
600.ÜO " ,1)1) :. 3t:,. 00 5'~'? -, 7 1?15S 1 ~ , -1 ~~I'I 56120?9:' 5HS?¿,:;,O. 71 n7(1 19 29.:.'? ',\'1-19::;' 55. 67
71)(1. ÜÜ 1:' . 1)0 :':6.00 69'7. (I.? 23.3-15 3 -1,6('\'1 5Ijl"79'¡.90 596:1:í-10,-10 n-Ü 19 29,-J9 '.\'1'¡9 2, ~..6 11
20(1.1)0 15.1)1) .23.).0(1 79-1.]1 3¿'.39S 53. ~5\'1 561i75,055 :.'~69¿,~''''.'::0 n""O 19 2';'.:1,1) ',,'1'¡9 29 5ë,,058
';'1)0. (If) II?"""' (I ~'r.69 ~91).O; .J?""2S :9.53\'1 561i5(I,1, 5968613.66 n"':'1) 1~ 2~.:'3 1r.'1-1? 29 5-. ~2
1(11)1).1)(1 ::. . ~ 9 255,'¡"¡ 983,51 6(1. 71)~ 11 ] , :- ')\'1 5617lo5.051 5 9 ¿. 5 6 (I:' . ..J I) n -. 1:1 I? .: 9 . 1 3 ',\'1-19:?:, ~ . .1 1
11':11).1)(1 2'"' . ~,3 2¿,O,cq 107.1.05 ¿,?25S 15-1."71\'1 561675.1.3 5S'';:~5';.~,. 5:' n"" (I 1';:' ¿' ~ (I..) ',..'1'¡9:9 59.0:2
1200.00 31.93 ;;';:-1. ,? 1 1160.95 -'5.303 :'(1 j . 75t"] :,61626.20 5 9 t. 'e 51? i . I)"':' n'"'O 1'01 2S?, 99 ',\'1-19 3(1 ('1. ':05
1 3 I) ':0 . (I (i :6,63 26"".S¿; 1:'¡:'.56 ""'~,c<1~ :'5;:¡.9:1'1 =, ¿. 1 5 7 I) . I) -I :1;+6o:?5:~?,.11 niO 19 28.95 IrJl-1? 31) (1::.';:~1
1 .¡ C' 0 . (10 ~ 1 . ~ 9 2'"'0.31 1;.2.1. 25 -'9.7,,)3 3:' 2. ?.¡\" 56150-:.1:, 5';'~~.581. .:.t, n - 'J 1:;' 2 S? , 9 -1 '..~'1..J:;' 30 Ü-l.53
1 5 ,) ,) , (10 .¡.:: .1:;' ~7~'.~.3 1:93.-12 -. ~ . 11):: ~n. 0')\"1 ':,051-137.;+9 :.9'::9=,,~:. 70J n """' (I 1 9 :1.~. ~ 5 ".' 1'¡ ';0 ~ 0 (I'::. 5'¡
16(1(1. I~IO 51. Ü2 :: -.¡ . I) ~ 1-1':,9,53 "7?,. ~9S .I 66.;:- 71'] 5 .:. 1 : 6 3 . (I;¡ 5?.:.S586.~'¡ f.L;0 19 2'j.ÜÜ '.\' 1.J ~ ~ I~I I) ~ . -. 3
1 -'(1(1. (11:1 ~. 5. -e.~ 275.5-1 1:,19.Ü"7 ¿,:.1:.3 ':,.1 ¿, . ? 91'1 5 .:: 1 2 ~,:3 . ,) 3 5%259:'..13 n"" (I l'~ :. ';f . I) tS 1'.'1 .¡ ~ 3 0 11. (I ¿,
18Ü(I.I)1) ¿,(to "'5 ~.: €- . 8 r 15'"'1.5? 5:. ~.?S ¿, 31 . -151'1 5 01 9 8 . -1 ':' :,9¿.~.t,I)O. 9¿, n""'(1 1';1 :. 9,15 '".'1,)9:0 13,5:'
19;'1.';:- 65.::2 ¿::.?? 1613.2: '¡'"', 36S '"'12. -J 1\"1 56111""'. 7!'"' 5'?¿, ~61'), ~ ~ T! """' (I 1;" ::'j.:: ¿; '.\' 1 ..} ~ 3 (I 1:.. '? (I
¿:, 1)(1(1. (II) ¿,5 , :::2 :\..."""' . 99 1¿,5~.6:: 33. ¿'.?S .~(1'1..? lr.J 561019.8; :,968¿,23."':'1) n"'O 15' ':9.3'~ ,.\r 1 .J ~ ? 1:1 1 ~ . -'.J
.2 2 ~ I) . .J Ü ':':'.:';: ¿""~.99 1 '"'51. I)') 5 '?'"'; H")7. 9-1'1 :\ 6 1:1 8 2 1 . :.1 :,?¿,~~...J ~. ;.:' n : I) 1 St .2 9 . E ¿: ':'1 ~9 30 :;:-:1.5:
:-' 51)(1.1)(1 05 5 .~':: ~'-~.99 186::'.19 :' 9. -J ITI 1~' 5'? . H\'1 5¿:O5¿;9.?€ :'?¿::.¿. ~:.. 1.? n ... I) 1 -;. :. (I . I) 1 '.\' 1 ~ 9 ] I) 3. 1 . :;~,
:: (11)(1.1).:1 6~.~1 2::.99 ::'Ü""",.....;t3 92. :.(IJ] 1 -,)'3, S'2\"1 5¿'('11~.S?5 596?'"'~2.61 n -:' (I 1 .~~ ~ Ü . ¿.? ...'l.J';. ~O .J.J.??
3.J::';: . ~ ~ 65.;';2 2~-:.~9 2.2¿:-1.1)(I 15(1. ':'""11 211'1. H\'] 5597C'9. I? :.::'6.?-.~t5. ':'5 n'"'O 19 31.~r) '.'.'1 ..J? ~ I~I 5 6 . ? ~
3 :,(1(1.1)0 t 5.:';: :"""'- . :-9 ".:: .?... . 3 3 155,5~/l ~'153.'¡ ':'1'1 5:,;+ ¿,¿'S' . <?.¡ 5 ':1 ¿. ': ~ I) 2 . I:I.J n '"' ,) 1 '? 3 1 . 2 5 ':.' 1 .1;' ? r) S 2 . 11
..J I) Ü I~I . I} I) 65.22 ':-':.99 2 .J.9t5. ~(I :'1,? 6?!! 2 ¿'(I~ . (I ?\"] :,59.?1~..33 5?¿,~?~,1. r n """' 1:1 l'~ 3 1 . :-: ','.'1-1? ~ 1 1.1,~:
J 5 (I (I . (I I) 65.22 ::"'.~9 ~ '-¡Üt, . .J.j 2,? 1 . '"' S?II ) I) S .., . :. ~ t"J 55~,-'.;9. 82 59t5?9:0. .~(I nil) 19 -::2.~'? ." 1-1? 7! 1 :::.1. ~ 5
.¡ ¿,.¡:: , =,3 ~,5. ::;: :.. -::.99 2""'6':',21 2';':;' . ":'¿,'I 3P5, 7.1\'1 =.:' ~6.Jl. 5.J I:.?¿:.;.~...... '?~ n -. (I 1';' 3;:. 6":' 'I: l..J 9 ? 1 2 ~ . .) 9
oJ -; (I (t . (I t) ¿.~ .5(1 277.~9 .::: -:';'1. (I"""' 3(16. ';.6IJ j~ ]""' , ':'-1\1 5 5 3 ~:.? (, . 1 S 59¿:<?~J~.63 nil) 19327..) ',}1B 31 2:1.59
..J ':'0(1.1)(1 60.51) 2"'~.9~ ~. !: 3 ~ . I) ~ ?19.23r'l j 3~''¡ . .1 7\'1 :,:.?5(1::. 6; 59';:,?~:'5~,. 1 '! n.il) 1';' ~::.2¿. '.d.J9 31 32. U
..} ~I:IÜ. I)t) 51.51) ~....... . ~ j :'S2~'. 52 331.1.¡n ~,.¡ r) '? . .:?.J \"1 553-1F.:l 5'j ¿. :.96: . ~ (I n"'Ü 19 32.'9: \,'1 .1 9 :. 1 H..:.2
'; (I (I (I . (I I) 5~.50 2~"'.9~ ~'9-15 , .J-1 :..¡ 2 ,0505[1 ~,.¡ ~ 1. -12\'1 55,3335. ':,-1 :.~6S9-':. :':, n"""'l) 1~ 33.(1';' ',".'1 .1 ~ 3 1 3"". (11
51 (11:1. ')0 S 1,5':' ~ ~,""", . '~;, 3 (11)5.62 ;::,3. "76!1 3:;''''' (\ . 51)t.] 55S25¿;.39 5:;..::;<?:?~e.'"'1 n -;' (I 1? ?':'. 2 (I ':'1-19 31 ! ~I . ;.::
5:' (II) . I) I) .¡ ~ .5(1 :.-,-. '?~ ~ I) Eo 9 . ~:. (t :¿,-1, -1')rJ 3¿,.J6.?5\' 5581,3C:r...J¿, 59ojS?';.e¡. -.1 n -, (I 1 ~ 3?! I) '.-:1'¡? 31 .Jl,:,-1
5;': ~.:: . .:: t, ~ ¿, ,I):' 2"""'-'.;.~ 3 1 2 6 . (I (I 3'"':'.~.Jr : : I) 6 . ~ 6 \'1 55S12r:'.:'~ 5,?¿.9(1(lt,. ¿;~ n : (I 1 9 :, 3 . ~, S ',\1 1..J 9 31 -1;1.':: 9
:,~(lO.OO ~ 5. =.1) .:'"7-.99 3 ! 3 3 , 1 ,) r4.5'"'!'J 3-1?7¿,\'] 55S10"7.';¡? 5 ~ 6 ~ (11:1 ? . 3 1 n'"'l) 19 37!, ~O ',.:1 ~ ';. ] 1 J. 3. ¿:.
5 ..:J I~I Ü . (I I~' .¡:: . 5') ~."""' ~ . 9'9 3210.1)3 E-1,:'2IJ 3-8"7,5.1\'1 55'? I) ;. 9 . 1 3 S'~¿'9(ll ~. ~(I n""Ü19 ~3.:.1) '.-:l.J9] 1 -J:" ¿,6
55(1(1.0(1 3 ';' ,5') 2-'7.~~ 322~.:.O 3?3.:m ; <?52. -J ."1"1 55":'9i-1.11 59¿.;,('25.99 n:(1 19 33.S~ ',d..j~ 31 .""'. ':,5
5 ¿, I) (I . I) I) .J.;' ~r"'1 2-'-:-.99 336..J.29 .J I) 1 . ,3 '~r J ~ 913 , -J 5\'1 55'"'j!?I)'? 5St€?Üj~. (15 n."""'(1 19 :3.6"""' ',',.'IB H -J':>,3:
5¿,-J2,82 35,21 ¿''''"7 . ';'? ;? ~.? . (I':' H':,. : <:IJ :~~] S. 2?!\"] SS-''?::.23 :,'j¿\;.O: -'. 3:J n"""'(I l'j 33. ...(, I'.' 1 .1 ~ ;. 1 5 (I . I)':;
5¿''?(1.15 :,!. . """";' ~. -:...,. 9~ 3 -J : '3 . (II) '¡C'9,lC'IJ 39t5.1. 8]\"1 55'"',~';:1. ~,S S ';h~ 9 (I ~ (I . 'e.J n"':'(I 19 33.""~ ':.' l'¡;. ~ 1 5 I) , ? 3
5 -'(1(1. (II) :. ~ .51) ::-'.99 3"¡ oJ oJ . ~ IJ .J (I'~ . e'::!l ? ';':(1.2 -I\'/ 5S'"'35¿,,2-J 5969 (I J 1 . S:' n '"' (I 1 9 ~~" - 5 ','.'1'¡ ';' : 1 50,;,~
5 ~ (I (, . C, (I .3 (I. :,1) 2"'''''.99 :"'531. (1(1 .n -:. ':::,[1 ..¡ I) ;; ~' . '"' li"1 ':, 5 .... ~ (I 3 . ..., ¿ :'?~. ~ (I~ : . ~ ~ n : I) I? ~. 3 '~ 2 ':; 1 ~ 9 3 1 52.52
53"7?OI) 2:' . 1~, 2"""';.99 3 59 51 . (II) -1~' 2.5 .1rr -IC'60, 5 ~I" 557:¿'5,86 5~~¿,9(1::,.3. ~ 9 n"""'(1 19 .?~..8; ',,:1-19 31 53, ¿,3
5~9""'.'¡'¡ 27.5'"' :' 7-'.99 ~'::H,U .J;;' 3 , : OrJ oJ (lt59 . :.3t"J 55:i5':..S5 5:? oj:? ':'5,,) . .;::' n-'(I 1~ 33.~8 1'.'1'¡9 ~1 5:.!?9
5?(I(I.OÜ ::-'.5(1 '::::'"'.99 3¿;ló.'¡¿; .¡ ~ 3 , ~:. 611 .10'"'0. '"'0\'1 5:.-'-':.5. '5~ 5.?6?(IS~. ~~ n-'(I 19 33. S~ '.\' 1 ~;+ ~ 1 5 3 . :;. <.
5St9-."¡-J 2~.5i :1"""'"':'.99 3 -'Ot5. (1(1 -1:: ~ . ';'111 ~ 11] ,05\'1 5S:'"'l:?,:'9 5 '~ ¿, :? (I ¿. (I . J.J ,,-(11:" ~~.~:¿..J '.'.' 1 .J? 31 5 =, , 1 .::
¿,(II)!) . (1(1 2-1,5(1 2-'7.9~ 3"70'e.~3 .¡ ~ (I . (1611 .I 1l.J . lOt"] 55":'712,2'3 5 ? ~ 9 ':1 ~,I) . =, .... n '"' 'J 1 S' ;. 3 . 9 -1 '..Jl.J:;. 31 :,5,19
60.J1. ~'Ü ':3.2~ 27(.~9 3(~6.(lÜ -13::.::' '"'11 .1 13 (I. '::<'\'1 5 5 i I:) 9 5 . : I) 5?..;~Ü¿'.?. -:'t:~ 117(1 19 3::.?7 1,..'H9 jl 55. ¿,"7
6062. ?:. 22,61 .2"""'"""'.99 3 7 ¿..:. . IJ I) ..¡ 7!, 3 . 5511 ~13'~. 0(11'1 :.~,""",,,?..,. ~l 5'9 ¿, ';' I~I ¿. ~ . .: .., n":' I) 1 ~ 3 3 . 9 8 ',.¡l.J? 31 55.9~
611) I) . I) Ü .: 1.5(1 ~'-'; ~9 380'J.:7 .J35.'¡!?! ~152, i9\'1 5:. ;¿,"" j. :.1 :.?69(1t.:,. 69 n .... (I I? :. ~ . (II) ,\'1'¡9:1 5 r3 j~.
U i1 Hi I/Vl -
Grid Reporl
.3 of4
;',11 data in f.:et unlo:-.=;s .:,r:hen-..i,;¡o:- st3t':?d. ':':.lculatl':,n u::es minirTI'..un ,::ur':",tur'? mo:th,:,d.
r::-,:"ndin,ues from slc,t n1:;¡ an.j T'.'D ire!TI Fn: 10,2' 111-;;'-15E\ (11)2.(10 Ft ab,)'"o:- rT1""'3n :=.:a l",':el'.
Eotr:o!TI h01':? distance is .J339.~9 on aZl!TIur:h 2~6.1)6 degrees fro~ wel1he3d.
Total Dogleg for we11path is 114.eO degre.:s.
',.'ert ieal £"",ctlOn 1.5 fH)m \,'ellhead on a::imur:h ::"75.99 d':?gr'?o:-s.
Gr1d 15 alaska - :ono:- 4
Grid coordinates 1n FEET and computed uSIng th'? Clark'? - 1266 sph",roid
Present':?d b,- Baker Hughes I!!TE':'
Phillips Alaska, Inc.
Pad 1C,l19
Kuparuk Fi~er Unit,lJorth Slope, Alaska
PF.':'P'),3AL LlSTI!JG Pag~;;:
"":,ur ref: II'? ':er::::i,:,n ~4
la::. t r e'.' i :: -= d . 2 ~ - Ha " - 2 (I C' 1
H€asuro:d Inclin
D':?pth D.:gree::::
6100,68
61.J9.S6
6225.42
6:2~,65
6424.42
650(1.0(1
65'~.65
Degr~8s
A::imuth 'True ':ert
D",pth
11.48
¿ .~9
?~{ ~9
3901.00
3947,00
3919.00
.JOlS.OO
4105,00
~1~6.02
.J249.93
F. E ':- 'I' A rJ G U L A F
C Co 0 F. 0 I !J A 'I' £ .3
':' 0:0 (\ F. D S
]J,:,nhing
-- EO'::; F ;., PHI C
COOP.C'I!JATE.:-
:0. L)I)
2(1.00
277.99
~7:.~~~
,.:; F I D
E3..:tlng
.J3:;.52!J
-B~. 941)
441 .5311
.J4';; 44!!
45':'.9911
41 'j 3. (\ 3\'1
.J 1 "'0. ;;. E\.¡
.JI95,8"7\'1
4 2 3 ° . 8 3 \.1
5'965'065. -
59690';;9. (II)
5969071,39
3 4 . I) 0 '.oJ 1 .J'~ 3 1
3 J . r:':: I,d 4? : 1
:4.0¿. ,,-..14931
34.11 Vl14?:1
34.15 '..¡U?:1
21). (11:1
.2 (I. (II)
~' .99
n~O 19
n ~ (I 1 ~
n~O 19
[,7(1 I?
n"'O 19
~.5;6"3.~.
5:,76,6.00
55~~j(l. 38
~~"'5'~5. 3'1
5 9 6 .~ I) '7 ¿. . (I 1
59¿;90'?('.31)
:' (1.1)(1
;::0. .:1(1
..:. ':.':.
.. , .99
4263,2:\-1
557~16.2. ~::'l
4 5J. 59!J
4 5S, 22!!
~ :: ,~,~ . g 7\.)
~315,5l\'1
SS7S37.2St
55 ;:.10. t52
n70 19 ~J.19 wl~9 ~~ 1:1(1.:9
n70 19 34,2:: w1~? 32 01.07
59690~:.r ¿;'?
596~Ü27. :.)
All d3ta in fe",t unl",ss 0therl~1So:- :=t:.to:-d. C:.lcu13r:ion use5 roinimu~ c~r~:.t~re rT1.:thod.
':',,:,..:..r-:'I1nat.:3 tr,:,m sl,:,t U11;1 and T':D fr,:,m FVE' 1';'2' 1))-;:'~5EI '1');:' .1)1) Ft ab,:,"-:- ~-:-an 5':3 le"ell.
Botto~ hole distance is 4339.~~ on a=irT1uth 2~6.0¿; d.:gre0:2 fro~ wellhead.
Total Doglo:g for w.:l1path i; 1lJ,30 degr",e2.
"o:rtl,:a1 ::ecti':'D i; fre'[T1 ','10:11he":.d c'n 03.::1ITIljch 2~'j.j':. ,::3egr-=o:.:.
GrId is ala5~a - :an", 4.
Grid coordinate.: in FEET and cOrT1puted using the Clark.: - 1866 spheroid
Pr",::ented b~' E3.ker H'j';rh€s I!]TE':'
Phillip; .=da5I.;,3. Ir.,:,
P:.d 10:,119
Y.up:.rul( F.i"¿r UrLit,!I,:,rth Sl,:pe. ,;las,ka
PE'P':'.:AL LETI!1G Pag", ~
~)ur r",f : 119 ~.:rsion U.J
Laõt r",".'i.5¿d : 23-J.!3~'-¿r:"~1
rID
T':D
C,:,rrlr(1o:ntz In "'e!l¡:.,::.th
--------------------
--------------------
(I . (II)!]
Fectangu1::.r Co)rd5.
V.oJ F
E,:'~in Turn
,':',:,mrr,o: n t
5E . 33
5 ¿. . ::< ~
5~, :'~
5~, . ¿.(I
5';'. :,5
~, ¡) I) . Ij I)
2(11). (1(,1
-----------------------------------------------------------------------------------------------------------
1 i? '? 1 . ,:;~
¿~:. (I. oJ (I
;.J =. ¿.. ~'':
~6J2.5?
5282.6':,
5t,~2. ~.:::
5 .:; ? ,) . 1 5
5 8 7 8 . (I (I
5~97..J.J
5997..J-I
'::Ü.J 1.2')
6Üt.:'.92
r510'). ~,3
';;1.J9.~6
6225...J2
63;;'~,¿,5
t5L.J..J2
t55-:'$? t.5
T,:,p [1['
~,(, (I. I) I)
~~.J.31
It513,22
1 "751. ')1)
~'¿69. (1('
:' '66, .:: 1
.31~' t. . (1(1
:3'3~::'.OÜ
? -J 3 e .I)(t
3 5 9 .~ . (I Ü
:E,16,19
j -;' (I ¿: . I) Ü
3"7..J6.(¡Ü
i-:'6.;.r)Ü
?:I)l.ÜÜ
3 S..¡'" . (II)
3 ';'1 '! . (1('1
.J ')15. ,)(1
~ 1':'5. (II)
~'::~9.?3
T,:,p T"['
3':'. ~ 95
r. 2 ¿:.:
:.. .3~S
1 5'~ , (I~I)
~'99. -;6))
3-2.8.J!I
-1':15. .38!1
.J ')? lOIJ
~:2.:'.Jrr
.J;?:?, . t I)IJ
.J29.'?lIl
.J 2,2. :. 71]
4~3.55I1
~35,S,2I)
B7, '?.JI!
..I.J1.5::II
~.JI5, .J4I1
.J50 9911
-I 'j~, ,3211
I). (¡(IE
=,3.95\'1
7 1 2 . ..¡ 1 \" E'O:
1(,,)7, ,;.~\,]
e:..:.: Ferp,afrc,::r:
2119. l';,¡¡ 1":,[-' ¡q 5
31e5,"'4~ Eegin Drop
3~06..J6W T0p Ugnu C
393~.29W Tcp Ugnu B
j?64,a~W Top Ugnu ~
"¡').;(I.5?\'1 VI:,
..¡ (16S'. :,3\'1 ':03.:: 1 n.;! ;': 0::' Pt
~11~,05W Top W Sak D
.Jl!.1).6:\'1 C
"¡1:9.0('\'1 B
..Jl53.(1,3\'/ ;;4
~1~O,13W Target A3 E0C
H 95. = 'to) ;..2
n: c'. ~ :'\'1 ,:,1
"¡263.27W Bas.: W .::.~
~215.51W 'I'D - Casing Pr:
C33ing position5 in .:trlng 'A'
------------------------------
------------------------------
(I. (lOrJ
F.:~tangul::.r Co)rds.
~S~.~2JJ
-----------------------------------------------------------------------------------------------------------
T3 t";)", t name
(1.1:11)
(I. I~I(I
E.:,r: rID e,:,t T:C'
Fectangular Coord::.
',: :. s 1ng
I:'. (I')E
D15.51\'1
3 1 ¿ '::-.~sing
65.78.65
42.J.? . ;.;,
Tar-;ret.: a.::s,:,c-i:.t.:d I,áth thl¿ 'Iellp,ath
-------------------------------------
-------------------------------------
Geographic Location
T,','. Q,
F",ct:.ngu1ar C00rdin::.to:-¿
pe"ised
0 G ^'4'
J "J . <...
-~WN Ð 'L' 1
V \11,( k~
nh,' Ltt
t,j()'Lt~-;':
1),)orJ' ':1' (11)(1
~~0¿~~;'00~\'~Ç9LSS
I ¡'}(r <'3,J - S , ::H :q ?l.j
- - - --- - - - - -- - - ---- --- -- --- - - - -- - - - - - - - - - - - - - - - - - --- - -- - -- - ----- --- - - - - -- - - -- - -- - -- - - - - --- - - - -- ---- -- -- - -- --
l ':":' ¡: - U E' [' - ,j
¡.j t ': I) - 1 !>
r JÜ t
1JOd~~ P!JQ
c,'
=r
.....,
c-~
.......
..........
~
~,
a
[ .
u
(1'
D
-'
'JJ
(J
In ~
::1 ::)
(> CJ
::)
TJ
U
u
,
<1'
c1J < 1 21 . -
= -I
¿ Ò '-"1 :~;
((J
,-
(]1
,
<1\ ::)
Q <D
Q \-j "':'I} - J.-
(11 "- c...~
D
-=; ::)
if) U
r" Ii
(> ,
ì
- 0'
TJ -, <l7ïI- 0-- - c'
nj ,
--.. (j,
C11 ili
ell
=)
c.
(1'
(1,
,-,
C1
1'.1
+-
c)
r".I
l.n
'-:-)
¡''>
0'
(=.1
f'.I
J
C'
kl
cD
(~)
( "J
(=-- £i.\. ;~
c= \.)f...,., \ ¿,
;~ ~f .c,;
~,t'-
/'~- c'
,~ /J~,~,\
I:)
f',1
OJ
c
1')
C1
Cl
I',_J
(_>I
r=J
I' ,J
f')
l=J
Eì
<:;a
f'l
CJ
Q',
'-~,
cD
{--J
C,J
- \ -
.... \' \ ,"'5'
,:;;, \- -,- -\- ¿;. - ~ -.- - '\;7~-,'-/L~/
~, ' \;:f \ ' ..~ / \,w
, ò \ \ 'J ' '~'-:--../ j:,-,
\ <::,', .-li": '-~J'" ,':'
\\ , ,,'<, - / c~ ~w-/
\ ' \..,/ ,,/ c, '1:
\ \. \-,/ \-;,A;/
" " /" ~<"" // "'" . Î
\.,<x<. - ;< ~l
"" "" / . -., í :;:
,,/~:~y/
rJ ./ J (_.....
- ~~///~~
r~, (.If' \ò
1~1 '.\
~; \~)
(=1
I:~~ J
¡',
'.c"J
l_.n
'=J
'-
+-
,-,
l_-
"
J'\.
~: ".. "..
+--
CJ
(-oj
c-=.,
\
}8~~
":'1
.'.
I :.'. "
,-,
,-,
, .
1=1
'.L;
f:-J
cü
1- ,
'-=J
, ,
(:..)
.
~ ~'
~'!i:!~
- ... 0 i ~
~ E ~~:~;i
.c II¡ õ ¿ ~ :'"!
II¡., ~ ~ ; ~ !.IJ
.~ ~ ~ ~ ~
f ~ "t - ~
.. III
~ i. ~
~ ~
'9~
~
t
..,
ãï
a. ~
.. 2
^ n
c: -
-0 ~
C III
~
~
::r
þrooorI.
~
~
þoooorI .
"'0
(J)
:u æ
., a.
~ ~
c n
~
~
þoooooorI
PJ
UJ
~
C,?
r
g
~
õ'
:J
z =E
0 <11
::t =
::T ..
V\ ~
.g ~
~
~
::;
(")
:Þ
C
~
C
c:
::1:-
..........
c-:-.
--...:
----- ".
<
~
........
C,,:;':'I,, " ['1 I. -..~r.
W'< r'-,I - for: S M('Kee~('
.'", ,::",::;::",::!;i~:;;~~i~' "~'''"~
HUGHES
I,\TEI)
P11illips Alasl<a
St.."." , ,., IC ' In c .
Field: t<upcruk R' Well: 119
..er Unit
Locction : NCr1
h Slope. lIlcSkc
~-
~ PHilLIPS'
ft(j
380
< ~o We s t (f e e t )
I 160 140
, t~
(:" ~ I
\~\ \;~\
. f,OO ~y
-Et :'00
. ::'00
. f.OD -
3iO
340
!,20
300
2ao
26(.1
I
240
2?Cr
200
120
I
IDa
80
to
::0
0
LO
40
40
8(' -
. :'00
G I) - (~..~':~t
. ~,oo
. 500
. 800
$-300
. ~üo
4.) -
. 700
...---..
-+-
Q)
Q)
-
'-""
800
1000 ... gOO
... .. _..--'~-üü \
-@'if - - - - - - - - ';;'"
.?ll - - '- - - - - - -- . J" <900 - "
- - - - - ""'" ,'000 2°''')- -~
,- ;"7- -. - - 2"'11,'-, ~ --------------- - . . - '00
"-' - - 24 on 2300 ~~~ . eoo " - "
~--------------- - - - _. "('0 \ - '00 '"
60 : -.- - - - - - - - - - - ."°0 - - - - - \ . -<200 - - - - . H 00 .' Ou') , '.50~ '00. : 0
, ". E.QO \-;4-
~ 1100 .' .
" 700
\
1100 \ - . .. .. .. .. .. .. .. "'9~0
- - - - - . - - - - - - - \ ~ l~~OO .
\ '000
1100 \ .
\' ,00
Î II ,"0
\
~~
-.._1.2°0
2') -
- "I ~ 00
.-
(I -
e
. ~OO
" - 500 é-
~,O(I
-L
-
:J
0
(f)
"'8(1i)
" 7 Of)
f3
", _.JOG
:¡Ou - ~'J
" WO
"800
. "00
/. - ('.(1
f)O(' t:.~~?:,-
80 -@I-- - - -
- - - - - - - - I ,~,Oll
--...------------
- - - - ~ ~O~'
-800
... 900
. ;'1)0
.9(10
1 (1') -
. c:Y:'- 100
80('
\W(I
. I Oü(¡
12(1 -
900
9(10
I ~ü -
~ I ¿(J(¡
I f.O -
.' 10(¡O
1 OI)Ci
(0~~T I ,~oü
(:j~:~\
,'ß)
l. :~.~ ~'.\
ICII)-,
~,81)
.'¡f,O
340
3:::0
~,(lO
280
lC.O
2~)
?~O
lOCi
180
1 E,(I
. W I~O
.. - est (feet)
100
¿li
1 ?O
dO
f.O
~I)
:;'l'
(I
40
w
- 80
- Err)
- 20
(j)
0
c
-
:r
,........,
-
ro
ro
-
'-""
'.'
- 80
- 1 ~.ü
- I ~t)
- I £,¡j
18ú
61)
C
::x:J
----
~
............
~
........
1 ::(, -
...---..
-+-
Q)
Q)
"+-
'-"
.r
-+-
:J
0
V1
80 -
1 ¿IJ -
1(,0 -
~I)(I -
2"0 -
180 -
,3"0 -
- - -
,- I ¡(lÜ . 160Ü /--
- - "II - - - - - \~ -
- - - - - - - 2400 .........
- - - - - - - - - - If.,OO 25~-~-
3000.- - ~~~_.,,-oõ- - - ""-
~
l'r. :10: J [. f -:1"
for: S M('KeeH'r
(..]IE t'1,,~r I"',]
:"-LC.:;, -¡'WI
Flo.iI ""':1,:"",,,,,,:,; .¡ 119 "'10'--;-:'1". '4
(,:,:..',],,-I:,I+j, ].", ,,' 1"",1 ro:l".'o:r..:,!, '::1(' 'II~
ir,,-, 'i~rt<ul l'eí.lt,~ ,:"': 'tle,¡;r,,:«: F,I(!j 1(1';" IÞ~-Z,J:()
iiíiii
BAKER
HUGHES
INT£Q
1 ;:ûO
11 f.O
1050
11~O
10~O
16'J -
(!l!J-
~.... ~.1 (iÜ
81) -
41.) -
-G-- -
0 -
1130ÍJ
--._--
40 -
~ ¿,.~OÜ
36tJÍJ
,135(;0
-',:D-
ITi--~
1 ~Ol)
111',1)
11 ~O
1080
1(1~I)
(!7 '
----
lODe,
1000
P 11 i 11 ips A 1 ask a, I 11 C .
Slruclure : Pad IC
Well: 119
Field: Kuparuk River Un;1
location: Uorlh Slape. Alaska
".: - West (feet)
'jf,rj
92IJ
¿,~¡)
ð~O
1:'0(r
760
¡;:;o
- --.2000
- " ] '~(u:l
,~...tC'Ü
330(1
..9j.-
I f'(¡O
-.-----.- - - ....----.--
---.------ I ------.--
----.-----¡-
'jf,O
920
i3f'.O
8~O
8(1(1
760
¡ll)
,- West (feet)
~,~(¡
E,4Ü 600 5f.CI ~L(I 480 440
r.;>~ì Qf~ " 1300
. -. .. 1"100
, ìOO
1 ~O(J
,..::.;L~'
680
640
f.I-I(I
::1t:,O
')2(1
48')
.. 1_200
. 1400
IS,jO
44(1
/PHILLlP~
r¡7p.
~
40(1
JfO
320
(f~"
- 160
. 1100
,,~-
.11 (1~ì;J - 1 ~ú
~-
- 80
.. 1300
(!J2r J Ù
- 0
~r)
(/I
0
C
-+
:J
80
....---
-
()
~
'--"
- 1211
, ..
- I E.')
l:§'0 -
- 2Ú)
. 14(1(1
- L.1Ü
[~I? ~-
- 2ihl
- ~;¿(I
4 ('l)
.I.?ü
5f.,O
c
::c
~-
~~
..........
~
t~
I ', ;"(10
,--...
Q; I (II)
Q)
-
'-'"
..c (I
--
L
0
Z II)I)
:!Ij¡j
3(1(1
..tüo
('-O¡;.:'It>O to, I,',:r.
For: S McKeever
1Xo1F. ¡::"":IIEJ ¿4-~:i,-.?(t(11
"I{'OI ¡::çl,ere,".:è' .. 110:. "¡f':."':" 14
Cc.c.,'o,,"I.;,le,: u""" ..";, hi' rEI.;r.:r.:~ ,,,=1 'II'';'
i'-LJI: ..,;;"...:,;., I)Eí.\r"; ore '.¡:Iei-:,"..::e .;"tj l(i,i (~-L4-:,L'
Rili
8ft.Ls
.",nQ
J.?Où
j100
':,',)00
2900
2500
ïOO
f.O(r -
-:,(11) -
400 -
~':IO -"--'--!2/-- - - - - - -:~ 7~CJ_' - - - -
261)(1
--1-_-
~,(l0 -
E (it') -------r
P 11 i II ips A 1 ask a, I 11 C .
Slruclure : Pad C
Well: ! 19
r;eld : KLlparLlk River Uni!
Location: North Slope. Alaska
<:- We sf (feet)
2 7Ll0
2f.Crli
2::.0l)
24(1('
2,00
2100
2000
1900
IÖÜÜ
I ïÙ(1
2300
\./.~~7
~ ¿.IOQ
- -~:.3(~(~ _.'._1 00
-.. ~9?O-
- ._2.71~0. 2600
- ~ - .. ?~ûO
2.5('0
~
~
~
I~OÜ IdOG 1300 1200 1100
Q;~,
. 1900
1(,00
. ,2000
- . ~49(¡
"II _2 ~ür)
- - . - - - - - - 241)0
- - -. - - - - - - - - - 3. 3~(~ - - - - - - 3 2~')1_) - - - -
2100
- - . - - - - - - 20('ù
- - -. - - - - - - - - -o.~ 9~(~ -
"'00
- èOO
. II~OÜ
Q~~ ~llÙ
1800
. (~~;¡- dÚO
- !Ol'
... ¿2ûù
- 2('0
'\
(?!ì-
- '1'°
z
0
:¡
:r
1800 -
- - - - - "(3- (J
,--..
-+,
CD
~
'"-'"
QJ I) /1)Ll
" ¿,300
.. .~8üO ~~I()CJ
~,OijQ ,4eoo
4(,00
44 on 4.'.00 4 ;'0(; .. 100 4000 3800 3800 3 700 ~,6pq- - 1 Ü(¡
. -. . .---- .. . . .,-
,~20(l
2P.,úO
....,-------;- - -----.-- ,------.--- --.------¡- ------.--- -~- -----.----- ..-----.- - -----¡--- i----'---
, - West (feet)
~100
~Of)CI
29ljû
271)1)
2f.rJ(j
~~{II)
:::~oo
1,~OO
2~'IXI
2100
1'~('rJ
13(1)
1:'00
;:'000
t~0 .
1 [",)(1
15(11)
1400
- . \900
- iÚ(1
- ~.(I:I
- "J(lll
1 e.1)~~ ..t:1~
- ')(1('
E.,I)'.I
I _'.O,)
I ZOO
1100
~
~.
----
c:
~
--..,..
~
~
...........
C.",r;,.,.; J to', r,".:..
For: S McKeever
:'400
~I.!OO
:.(lÜlJ
,..:)1'
\.--
O<JI.: ,;.1':11';1]
14 - u.:r, - :l(~:'1
."/~IÙ
I cell) .
1..\t)Ü
1 ;(10 -
1 ':rOO
"
~IJO
Q)
Q) 60,)
'+-
'-"
...c
-+-
!..... 401)
0
Z
~(10
(I
,;rot)
0..1(11)
J:"~I F«..r.":"r.~ ; II') \.:'f,"-V 11
(.:..:VJ,r";'llEõ .:,,'~.n 'F.¿ol rEI,!:r~r.:" ~w:.' 111';'
ir.~ VE."rJ' (1".:.lr,: (Ire 'EIIt"f"':": 11¡t,6 102" (t.-:t:.t!I,,:,.n
Rill
IUUŒR
HUGHES
II'/TEQ
t.!ÜO
600,')
~ÆOO
~.f.OÜ
18('0 -
':")(1 -
1)200
E,OÜO
~,801)
<¡~'oo
~ I!I, .---.--,
~.40(1
!'>200
~,ODO
'..., . 3785
.~" 4 700
31'.00. '. "',.,.4 (,')(1
""'-... 4 ~,OO
"""'-... ..\400
. 2900 "'. .....,~ 30ú 2~)DO'
.. 21300 ". ,4¿rJO .2';.°0-
.. 41(111 2400. \.~~1- 121)1j
. 2700.::0-~:::~~~'~~-~ '000
PIli II ips Alaska, Inc.
Slrucl...re : Pad 1 C
W611: 119
i ,eld : K",parLlk River un;!
localõon : ~Iorth Slope, Alaska
'. -
West (feet)
4ÖÜÜ
40('(1
,~6IJO
JõÜO
,34fjü
.3200
5ÜÜO
26Ü(r
2fOÜ
~60(1
4400
42Ü(1
\~:~~)
(~£Ò' ""'-.
4900 "",
4800
'/~; (.,' ,
0'/ (:';;~600
, .3 '::Jt) "...... -
2800" 2500
. 2.\00
noo"
.340()
.3500 ..
3200"
.310D"
.3000.:
~HILLlP~
'fTi1
~
2~OO
~ooü
220(1
- 1800
- 1 f.OO
.. 2,300
2600'
. 2200
- 14ür)
~ 2 4 (I~J
.\
2,300
. (':&¡ 800
z
0
::¡
:r
- f,(10
1~ - ~Ü(IO ,36DÜ .3300
- - -- - - - -~ - - -~~ 1 :Ir~ - - .L'~OÜ I
- - -' 28(lù
- -... - - - .} ~'(~O 260(1
- - .. - - 2:;'00 ;>..\00
- -. - - - - ,. - - - -.. 2 !-O(I - 2,})
---03..
III
----.----- -; - ----.-------.-- ---.----.--- -.------.----- .------.-----.------; -----.-------¡
4800
460û
~400
4~0¡)
4000
2.'j(l¡)
2600
3,<lüO
.3f,OO
:,~üO
3~'OI)
.\000
. - West (feet)
..--
--+.
CD
~
'-"
t!...1 ~,7 (J D
!.., I~IO.-:IJ] - 4(1ú
- II
I~
66(¡~. 7~'I~~-0- - 2liO
- 4(10
- (/1\)
24(10
!~.üo
~'¡jÜü
Phi 11 IpS Alasl<3, Inc.
Pad 1'::
119
s 1 ,)t ~ 11 9
Kuparul< Rl~er Unit
I¡-nth Sl':.1pe, Alask3
.3 1J !1 1.1 A R ï C L E ;;. F. A II C E F. E P (r F T
by
Eaker Hu'~he.s IIJTEC!
Your ref: 119 ~~rsion #~
Our ref : prop~?80
Liç~n~~ :
Date prInted: 10-Jul-2001
Date cr~ated: 8-Jan-2001
L3st re~i5~d: 6-Jul-200I
Field is centred on n~O l~ 1~,5~ó,w150 5 56.5~6
Structure iE centred on n'O 19 4S.1~?,w149 30 19.1:~
Sl~t 1,:,cation i~ n~(1 19 ~9.~22.wl~9 29 55.102
51,:,( -':;r1d c,:..:,rdlnates ,He II 596,?t:6.J .':'20, E 56192?, ?O3
510t local coordinat~s 3re 15~1.00 S 823.00 r
Projection t~~e: 31ask3 - :one ~, ~ph~roid: Clarke - le66
F.efer~nce IJ,:nth is Tr'.l-= 1J.::,rth
0bjeçt wellpath
mJD .;0-54~5'>..1:;,Parl E'
!lWD <0-6876'>..121,Pad E'
PIJSS <0 - 119l?'>..16,pad E
PM 55 <0 - S09S'>, ,1~,Pad Ie
GMS <0-7615'>, ,2,Pad Ie
Frrss <')-1 ~(199';., ,12, P,3,d lC
FNS5 <0-11300'>, ,11, Pad lC
GMS <0-9600'>, .S,Pad IC
!lI1S <6~143-7:,~O' >, ,NSII.2 J. Fad lC
Grr.s <O-~575'>".J,Pad lr::'
P¡.¡SS <0-1':'920'>, ,l"¡,Pad Ie
PJ.!.3.3 ,;0-939':">,,15,Pad lC
GH5 cO-77C¡O'>, ,l,P3d 1('
Fl-IS3 «1-1~63r)'>,,26,Pad E'
P!-!S5 .;(I-E'l~O'>, ,2S,Pad Ie
PlISS <IS"¡('-1?;o~5>, ,:3-", P",d lC
PJ.lSS <0-6529'>, ,23 PEl, Pad lC
~JSS <')-~O00'>, .9GI,P3d IC
PHS':; .r;(I-!:16::'>,,13,P3d Ie
UnknO\VI1 [\at'3, ,\'151, P'3d lC
GJ.l5 ~O-979~'>, ,7,Pad lC
,:;rIS <C'-l':''?.J3'>..6,P3d lC
Q!£ cO-7~53'>, ,5,P3d lC
PH.5S <I) - 10'~¿';.'),.17.Pa.:l1(:'
GH.3 <0-?700'>, ,3,pad IC
P).13S «I-l?911)'>..27,P:;¡d 1C
!'1\o'ID <O-6"¡5')'>, ,127,Pad 1<:'
PGM5 <0-9002'>, ,10GI,Pad 1C
m'JD < (\ - ..¡ Ó 1 5 ' > - ' 1 ~ 3 , p" dIe
[.f{'}D <0-5000' >, ,II ~,Pad IC
¡'fl'JD <')-???'>"l11,Pad 1C
Closest approach with 3-[\ !Ilnimum Distance method
Last re~ised Diztance N,D. Di~erg1ng from M,D.
26-Jun-2001 60,5 IJO.O 1.J0.0
2Q-Jun-201)1 31.~ I~O.O ~2~.3
8-Jan-19?? 182.1 120.0 1.20.0
22-F~b-1999 ¡O~.9 31)0.0 657~.6
IB-Dec-1992 .JJ~.O 300.0 300.0
7-Jãn-l~98
19-M3r-l?9~
12-D-=c-199S
17-Dec-199;
19-Dec-1992.
1@-Mar-1999
17-Dec-199g
11-l-I:;r-1999
2"¡-Aug-1999
~-Jun-1999
8-Jun-199~
13-Jul-1999
2-Jan-1993
I-Dec-199S
2-II,:,"-19?C¡
1~-Dec-1999
1@-Dec-199~
lS-Dec-1999
2-['ec-19?8
1~-Dec-199~
1-J3n-1999
3-Jul-200l
19-Dec-1992
5-Jun-2001
lO-Jul-2001
10-Jul-2001
3~S.5
?~2.~
360.1
11201.:
2.J9,")
~16.1:1
"¡20.-
560.6
532.~
516.C¡
~f.2.6
~~2.6
271.2
lS7.5
5121.6
262.;
195, ,)
1~?~
31,,) . 0
3"¡2,2
5~7.0
119.5
..¡ J .0
21:19.~
28.~
119.5
3'7.8
2&0.0
20.(1
927.3
20.1)
120.0
120.0
31)0.0
21).1)
322,2
20.1)
21:1.0
131!:1.2
100.0
6578.6
31)1).0
3(1(1.0
20,1)
100.0
300.0
20.0
~66.~
1109.1
~~~ 7
l~O.O
1"¡0.0
;77.8
220.0
657:.6
1 0(19.1
6~ÜO.O
12(1.0
120.rJ
30(1.0
2(1.0
3~L .2
1(1.(1
20.0
13l~.2
100.0
~5-2.~
31)0.0
300.0
:0.0
100.(1
62~û.o
:0.0
..)66 ;
1109.1
36~.7
"¡55.G
~~2.~
OJ1/(-;, 'NAL
j~ivJf)lJ.lf1
... 0019
t. ~ b9
(I I) rt ~
(I (I~ ";".:.
S rSb
€ ltS';
(I I) i: 1
T .:,r)8
"- Z (';
( .. '. c:
? ~r:;::
r S.1õ¿
";' -;Tn
€ ¿
,... ,..,..,..
c. c. Co r~
f' S. €.:T
Ü (Ie;
ç. 2LÇ?
1 rS¿-,';
¡,. .~:: t
¿, t õ ¿
1 III:
'~ B... £9
1 ¿ (il) 1
Ü Ürr?
(r üf'1
(.r ')õ I
¿ Co r- ¿
I 1 H
f H£
Ü üü¿
Ü ÜI~I ¿
'0 t£~T
(I ('õ T
(I r:'r:.1
9 ¿'... £9
'~ (I,:.)?
'... .:...:..("
T 11 ¿
r ,~U'
.:. as~
I) OS.~
? :: Z r:
S ì':;S
::, '; r ¿ T
Ü r:I¿'T
T 6ÜÕ
'. ,~,~s
C. L.;:õ
t 9 ¡:-S
;:: SILT
l r..
t t ':. r.
f' rtf
(I (IE,
I TH
T 6 (I IT
~ z ,~~
¿, 2 b ¿
I IT ¡:-
t rrr
¿ !.~6
I II ¿
':' (it I
(I oeT
£ IõElõ
I TE
f' f'ì '(:
Ü (1(1-;':
Ü ÜÜE
S t£O
Ü Ü~T
(I (If'T
9 ëLS~
f' ìì ¿
\.. ,:.: 'e.
I TH
J T . 'i: :: I
1(, . .:. \: T ,
L' d':~ I
I \~ . ~I~ ~ I
, ( " ,~£ (
I...~:?~I
, .:. ¿H (
19"¡:-..TI
, €. . ::.: ': I
::?~
, T' '(: II (
'L 'sn (
, r" Z ~ (
, f' ' rl) I 1
T'),)Z-.':12r.r- =
TO(,:-J:d'::'-:I
T(r(r,~-;¡d';'-ZI
IOO,~-;¡.j'r:.r_'?T
I (1) ;:-llj~-,~ 1
lÜ(¡~-,¡d';:.-:'T
¿.; E." T - ~ ~a -.~
TO,);:,-;¡d';'-9I
1(1(1:::- ;¡d',:,- ZT
1 (I 0 Z - J:,j,;,- 9 T
T 0(1;:- ;¡d\i- '?T
HI(J.:-.1d',~'-9 I
1 (I (I,~ - J:.j',:' - ': T
1 (10 ¡:- ;:¡d';,-::: I
10Ctè'-;¡d'::-Z1
H"E - ;¡,j1;:"- è'1
':,0561 -tJer-1
6f.I:iI-Q'='3-Zi.."
¿605T-:J:'ù-bl
866 1-:;',:'0]- & 1
366T-UEC-...
L¿61-;¡12Il-6I
õ66I-.J:.(]-õI
L605T-:':,'J-~ 1
E'66T-.Ja(]-el
8156 I - H'r¡ - 8 I
&6¿1-.J:.Q-¿T
66€T-;¡EI]-H
¿;66I-E,n,,:,- r.:
6t,6 1-un.c- t
.;.€¿I-unr-&
15661 -lrLC- £T
'=.E,¿ I -UP-[-¡;'
¿661-ur:,('-õ
~ E" 6T -'::'?ù - 1
~o56 I-..c'[j-,~
866"[- :'9ù-2 I
2661-.J?(]-21
8 ¿-' 6 T - .J:.ù - õ 1
9 E¿S9 ~ ~~ JE'o5EEI S661-~:.ù-ST
0 1)~61 (I IJa~ JS'LûZt T00~-7d~-6
"a . I i '.Li'~.IJ 6u ~ 6.< :.:, I,] '.J "r'1 ?.::,ue:¡ S1:'J P?s1=:.:.;¡:¡s '="1
pe,t.¡"J;?w a:,uE:¡5~r'J wnw~U~[r (]-E t¡:I1,':' tpE,~"tddE :¡:;?=':'IJ
1'~..:..8 I
¡ t . L£ 1
b" ~S';;:' (
'L'S'rS'
I Z. ~(I;: I
I Ò . ¿,~ 1
II' Stf' (
1£ . 9 ~ ( (
, 9 . I) E'. £ I
I':" as'ë: I
6' è'SIH (
'6"~r¡:\
1f"STë:1
) I:" I)': r 1
¡ ~'.:. ';£ (
115' 1);;:£ I
10'£1£1
¡ l' ,:9 r I
1 " ,:9 r I
IS'Üt;::t
¡i:'T~1
J .:.. .9 S' I I
}L"Üõ:...r(
Id"ES?(
) 1 . ':: E. I 1
1'(:'.:.SII
':.T pr:a' 1?"[" '(:n u':' 1" S..1:-=-, I TZ1
:.T P12d' 18:1 ¿'H' '.J "1'" :¡E'1-a ¿,:rT
:,1 pEd"'Ië[ r(IT" 13'1',,1 ~I:"l-a 1':) .:n ::1,\
.:'"[ PE'd'EET' 'rn tK'!~J:é-"', E£1
J1 P'=d''(:.:r''rn UC'p.I.:-:. €2'1
:' T P '= d . a , ;:: (r 1 ' , ,,;;! . I ' , ,I .L ':"1- a E':' :' I S l,j
:'T PlOd' L l' , I ,':,9601 - Ü> S-5['d
':,1 ¡:,ed'Ii:1"E# u':'P;¡e-¡. HI
J1 P12d' LIT' 't'll u':'T-S"J:,=-:. .:.11
.:-1 pE'¿' L;::'"[' 'E# U'='1=S.1:.:. .:.('1
':.1 Pl?d'6¡:1' ''(:# u'~1=';.1?... 6:::T
J1 pEa' £,:1' 'E# u'~1=S;¡.:-.. £:::1
:'T pea' III' , a"I "dJ:~.,1 ¿-.:I ':'1 Sl'\
.:."[ pEd' EII' , (a' T' ~3..1 ¡:',J .:n ;:11\
JT ped'£1I" la'1'~3~1 Z~ ~T :3'N
J"[ PEd'"[ÜI' '1# UC'P;;¡.:-., 1('T
:II P1;?d'~:-' '<.ÜI':;'~I-Ü> SS[id
.:'"[ PP-d'S1"<.C;602 - (» S3"IIa
JI PEd' 1:::'01' '<, ¡:rjl)6-0> 5IJ~'d
,:01 ped'¡:' '-::,SI9~-('> Sli::'
:' I pI? d ' Z1 ' '< , E. ë' (r L 1 - I) > S ::r.J:i
':'1 PI?d.'I1"<.Ü')¿IT-(I> ':::11.:1
:11 Pt2d'õ"<.':'Ü9¿.-(l> sn..:.
:,1 PE'd'f';:'II-SH' '<,O~S...-U6~:'> s¡.¡¡.
Jl PEd't"<,S~£~-(r> fII~1
':'1 pEd'r1"<,O%rJl-('> S::lld
:J"[ pea'S1' '<,1)6E6-1» ='3"Hd
:1'[ ¡;:'19ð'I' '<,üaLi..-(t> Sii::'
':'1 PP-d 's.':"' '< ,('¿9f'T-(I> ::S[k[
:' I p>; d ' C;': .. < , I) rI (r 1 - (I;" S :3'rId
J1 pe¿''"f,(:,~' '.~S~t;;:1-Üf'SP' S'::-Hd
JI ped'18d -;::~. '<,15':£';:'-'» 5::Ud
JI P~d'I~6' '<,OO0..-Q> SSM
.:' I P12d' 9 I ' . < . 21611 - (I > -: = 11¿
Jl P12d'U"<,.:.~9.;-(r> :::¡.¡a
:'1 pEa '1:'1',1' ',=':¡eoJ UF,'::;'J)(Uj¡
':'1 PEd'.:.' '<, rSL¿,-(r> 51]::::,
~T pe¿'9' '<,U2:(II-(I> fl'I:::,
JI ped"'S' '<,'(:SL--O> -:H~
Jl pE¿'¿' '<.OO¿6-(» :H~
~1 P~¿'S.rJl" I~"T'~) ~~~-8 T3 ~I 3M
.f".:..õi' 'f.',:. ':¡Ep:.:¡SE UI2 .':q p.:-J".J~pu1" ?H J=-¿,J (i(II:'I UEtp ::::::=-1 1':' S,3JI i':'".:i 13'1':' ::ofJIS':'3:1:'.3:(]
l.{ J E,j I 1=-,". :¡.J:. çq,:.
"?IQ'='T1E:.E :.;:¡=-lj:"', '1:;:"Ü11 'f,'¿, 'SJ;;)¡:'E.E ;,'~"'",.";,,,, UI u':'1J12.¡e,j=-,: =-=d1=1T3
. ': II :.,''', t.¡:¡ C"::¡ "E'.¡ p,=dJ P =-P :..H .:; IOo:¡ .'::.,',;:¡ ns U2l.{':. - 5 :.=d n T:. ?:¡ E "1 C,.j.E'.JU ~ IT 11'" :: ,:.1=:¡ ~W1"Xû;:¡d
1:.=-~ (rOl UEL¡:¡ 55=-1 s=-~ue;¡12,:.T:J c:¡ P:.:¡1=W~I 51" :¡JOd2d
t¡J:tql an.l,l .:;! 4-;¡;¡'~I¡ :.'::'U=-:t-=-J:.d
99'~T - :.)¡JEIJ :P1='='..1:24':1;: 'f' :.U';': - '=':1512T'= :e-d..'::¡ U':'p.J2~('J:d
3 (rO'Err.; S O(r'I~ST e;¡,= :;~1eu1"p10c~ T,=~cT J01S
f (I 't . t 2' ¿ I 9 ç 3 . (I Z' (I . r 9 '? ; .~ 6 '; [i :;. .1 e s; :J ¡; U l' P 1. .:' (I:" P l' .I~) 'J (I T 5
~1:lr.SS 6~ 6~TM'~~_.6~ 6I OLU 51' u'JJ~e~'~I :J')lE
tZT"6I ÜE 6tTM'E~I'Sf' 61 OLU uc p2.1JU=-~ 5! 2;¡n:¡.Jn.1:¡S
9£S"9£ £ 0£IM'9..£"81 91 o~U uo p=-;¡:¡u:.J s1 PT=-!J
1O(r:-~12H-¿Z : p9S1"~:.1 :¡se~
ICI(r;::-UEL~-8 : p2JI?:...1:.J ~"JEù
TOOè'-~eN-rZ : p;?1u1";¡d é-:¡ea
: .:-sua.J1"1
06Erdo;¡d : J¿.J: ;¡no
f'# u°1".:;;:¡a~ ¿TT : ~el ..1:no~
'~'3.L[IT sal{6nH ;¡a)¡ '= a
.':q
S3 r.LrJI":'~H.3:.)[I[¡ [JO r.LISÜd ::)lJIûfJ1.:,rn
.1 d Co d ::¡::I .3:':' lJ 't' "d '\;! 3 '1::0 3.J rJ ';' .L ~ I ,] ¡.¡ Ll £'J r [I I I.J oJ - (
ID!SeTI::' 'õd01S '.Pl('fJ
JtUn .1~~!d ~n~EdnA
E.1Tn );:'Ts
t,l1
:'01 PEd
':JUI 'E~s12I':' 5:jlTPl.{d
lC-119 Drillinq Hazards Summarï
(SEE WELL PLAN AND ATTACHEMENT FOR DETAILED DISCUSSION OF THESE RISKS)
7-7/8" Open Hole / 5-1/2" x 3-1/2" Casina Interval
Hazard
Broach of Conductor
Gas Hydrates
Running Sands and
Gravels
Abnormal Reservoir
Pressure
Lost circulation
Hole swabbing on trips
Risk Level
Low
Low
Moderate
Low
Low
Moderate
I Mitiqation Strateqy n'
Monitor cellar continuously during interval,
reduced flow rates until BHA is bleow
conductor.
Control drill, Reduced pump rates, Reduced
drilling fluid temperatures, Additions of
d ri Itreat.
Maintain planned mud parameters,
Increase mud weight, use weighted
sweeps, run gravel isolation string.
Diverter drills, increased mud weight.
Reduced pump rates, mud rheology, LCM
Trip speeds, Proper hole filling, pumping
out
1C-119 Drilling Hazards Summary
prepared by Steve McKeever
) p 1fYf~... ~ L
'Vest Sak lC-119l\rlonobore Injector" Cenlent Loads and CemCADE Sunlmary.
45 % Excess Below permafrost, 300 % Above.
7-7/8" Open hole. TO @ 6585' 1\'10. Single Stage Design.
5-112" X 3-112" Tapered String. 5-1/2" X 3-1/2" Cross over @ 5904'1\10.
Tail Slurry TOC @ 5404' l\rfO. (500' abo\'e Cross Over)
Port collar for no cement to surface contingency. Port Collar @ 1000' l\rID
Base of permafrost @ 2208' l\'ID.
Volume Cales:
Pump 40 bbls CW preflush, 50 bbls TvtudPUSH XL @ 10.2 ppg. Cenlent from TO to
5404' MD with Class G + adds @ 15.8 ppg, and fronl 5404' to surface with ASLite @
10.7 ppg.
Lead Slurry Requirements:
ASLite @ 10.7 ppg. Class G + 50% 0124, 3.50/0 044. 0.4% 046. 30CÆ, 053.
1.5% S 1, 1.50/0 079 - 4A4- ft3/sk
(5404' - 2208') x 0.1733 fr3/ft x 1.45 (45% excess)
2208' x 0.1733 x 4- (3000/0 excess)
803.10 ft3 + 1530.58 ft3
2333.68 ft3/4.44 fr3/sk
= 803.10 f13
= 1530.58 ft3
= 2333.68 ft3
= 525.6 sks
Round upto 540 sks
Tail Slurry Requirements:
Expanding Cement @ 15.8 ppg. Class G + 0.3% 065.0.20/0 0800. 2.0 gps
D600G, 0.150/0 D35. 0.20/0 047. 4.5£K, 0174 - 1.22 ft3/sk
(6585' - 5904') x 0.2714 fr3/ft x 1.45 (459é, excess)
(5904' - 5404') x 0.1733 ft3/ft x 1,..1.5 (450/0 excess)
80' (shoe joints) x 0.0488 ft3/ft
267.99 ft3 + 125.64 ft3 + 3.90 ft3
397.53 ft3/1.22 ft3/sk
= 267.99 ft3
= 125.64 fr3
= 3.90 f13
= 397.53 ft3
= 325.8 sks
Round upto 340 sks
CemCADE* Summary:
Fluid sequence: Establish circulation using FW. 40 bbl C\V 100 preflush, Drop
Botton) Plug. 50 bbls 10.2 ppg MudPUSH XL spacer. 540 sks (427 bbls) ASLite
Lead. 340 sks (74 bbls) Class G + adds. Drop Top Plug. Displacement is
approximately 146 bbls.
Circulation:
Circulation and cementing at or less than 6 bpm is within safe ECD to avoid
breaking down the formation. Recommend dropping the rate below 3 bpm for the
last 20 bbls of displacement for bumping the plug as well as maintaining returns.
Run dye nlarker in the spacer to provide insight into the decision to open port
collar or performing a top job.
Recommended Conditioned l\Iud Properties:
9.6 ppg. PV < 15, Ty < 15, as thin and light as possible for effective mud
remo\'al.
04-10-2001
AT
O~"l~JA'A'
... .. . ,. - J 1II,¡w¡,8
Well # 1 C-119, AFE # xxxx
West Sak Monobore Injector
Planned Completion Schematic,
Sheet 1 of 1
Christmas Tree:
(475-0605) Vetco-Gray, API 5K 7-11
16" Flange Bottom x API 5K 3-1/8"
Valves, with Otis 5-3/4" 5K Tree Top
Tubing Head:
(475-0515) Vetco-Gray, 10-
3/4" Gray QUick Connect ~
Bottom x API 5K 7-1/16" ~
Flange Top ~
~
16" Conductor
@ +1-158' MD
Port Collar @ 1,000' MD:
(491-9350) TAM 5-1/2" BTC
Box x Pin
Production Tubing:
(423-1660) 3-1/2" 9.3# L-80
EUE 8rd, AB Modified.
Production Casing
(467-0750) 5-1/2" 15.5# L-80
BTCM
XO I SBE to surface
Set XO I SBE +1- 100' above
top Perforation
Production Casing
(423-1660) 3-1/2" 9.3# L-80 EUE
8RD-Mod
TD to XO I SBE
- -
! I
~ ~
i ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~ ~
~ ~ ~
~ ~
~ ~
~ ~
~ ~
~ ~ Locator Seal Assembly: (461-3435) 3-1/2" Baker GBH-22 '80-
i i
~ ~ 40' wI 12' of Seals and Locator, 3-1/2" x 6' L-80 Handling Pup
2 ~
~ ~ (455-3185) installed on top. EUE 8rd AB Mod Box up.
~ ~
~ ~
~~ +-- Casing Bore Receptacle Assembly (461-3470) @ +1- 5897' MD,
¡ = ¡ 3706' TVD:
~~
¡ ¡ Baker 5-1/2" XO I Handling Pup, BTC x BTC
! ¡ Baker XO Coupling wI locator shoulder, BTC x SBE
! ¡ Baker 5" 00 x 4" 10 Seal Bore Extension 12'
. ;
~
¿
1
1-
~
f
J
TD 7-7/8" Hole
6578' MD, 4250' TVD
(';ìOOiPs'> PHILLIPS Alaska, Inc.
,~ A SUbs;d,a,y of PHILLIPS PETROlEUM COMPANY
Tubing Hanger:
(475-0525) 3-1/2" Vetco-Gray wI 3-1/2"
pup (EUE 8rd, AB Mod pin) down x
3.725" MCA box up
Casing Hanger:
(492-1810) 5-1/2" Vetco-Gray wI 5-11
2" pup (BTCM pin) down x 7.790"
MCA box up
Landing Ring:
(492-9750) Vetco-Gray, 16"
Weld on Bottom x 13-5/8" Male
Overshot Top
Nabors Rig 245 RKB @ 0'
Latitude: 70 deg, 19',29,722"
Longitude' 149 deg, 29', 55.064"
Elevation: 102.0' AMSL
~
~
I
~
Gas Lift Mandrel:
(477-4825) 3-1/2" x 1" Camco 'KBG-2-9' wI dummy valve
(474-7315), IBT special clearance box up x IBT special
clearance box down, with 6-foot tubing handling pups (XO to
EUE 8rd) installed on top and bottom.
(1) Joint Tubing
Landing Nipple: (461-6545) 3-1/2" Camco 'OS' wI 2.812" No-Go
Profile.
(1) Joint Tubing
(x) Joints Tubing, from Landing Sleeve to Seal Bore Extension
Landing Sleeve: 3-1/2" Weatherford, installed in top of joint #3.
(1) Joint Tubing (468-0725) Joint with Collar Thread Locked
CJ~
"::'(1)
It! QJ
E:.:.
c:u u
5~
Cl)QJ
~~
c::U)
<: ,.,
Æ~-
~~~
~ C'.4.C
c.) ~ ~
- 0.0
Float Collar: 3-1/2" Weatherford wI 3-1/2" EUE 8rd Box x Pin.
. . (468-0720) Joint with Float Collar made up
(2) Jomts Tubmg (468-0710) Joint with Float Shoe made up
Float Shoe: 3-1/2" Weatherford wI 3-1/2" EUE 8rd Box Up.
o.W\'~.. !
. - . - - ..." lit J.
American ExpressCØ) Cash Advance Draft 150
DATE I/:Ju ~ 2ðo1 81-«>'021
~~~:~ ~:E 5hfo!- "r A~ çf, 6- / I1:c6c ( I s I /00. â? I
------ Zk k-~;;¡;-~ ~/ ~ þe- . DOLLARS
Issued by Integrated Payment System, Inc.
Englewood. Colorado NOT V AUD FOR AMOUNT OVER $1000
Payable at NOlWest Bank of Grand Junction - Downtown. NA &t:/ SHARO~UP%
J ~d JL!n..sPon, Colorado ...~ ¿
PERIOD ENDING It: ~-I¡r{ 'Fh 7':2- "-'(I'
I: ~ 0 2 ~ 0 0 ... 0 0 I: ~ 5 III 0 ~ ? 5 000 5 ~ b III 0 ~ 50
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BEINCLUDEDINTRANSNUTTALLETTER
WELL NAME
CHECK 1
STANDARD LETTER
DEVELOPMENT
CHECK \VHA T APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last two (2)
digits are between 60-69)
DEVELOPMENT
REDRILL
PILOT HOLE (PH)
EXPLORATION
ANNULAR DISPOSAL
<->NO
INJECTION WELL
V
ANNULAR DISPOSAL
<-> YES
INJECTION \VELL
REDRILL
ANNULAR DISPOSAL
THIS WELL
\c..-\\~
"CLUE"
The permit is for a new well bore segment of existing well
---' Permit No, API No.
Production should continue to be reported as a function of
the original API number stated above.
In accordance with 20 AAC 25.005(t), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Annular disposal has not been requested. . .
Annular Disposal of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER Please note that an disposal of fluids generated. . .
ANNULUS /
~YES+
SP ACING EXCEPTION
Templates are located m drh'e\jody\templates
Enclosed Is the appro\'ed application for permit to drill the
above referenced well. The permit is approved subject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Company Name) will assume the liability of any protest to
the spacing exception that may occur.
WELL PERMIT CHECKLIST COMPANY I'A :J/ l' ( WELL NAME,,fR!-r /C-/'9 PROGRAM: exp - dev - redrll- serv >< well bore seg _ann. disposal para req-
FIELD & POOL Lj io I, ~ d INIT CLASS 1- .... j J 'A..-í GEOL AREA 77'6 UNIT# /// ~ ð ON/OFF SHORE GA.)
l I
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . r~ N
2. Lease number appropriate. .. . . . . . . . . . . . . . . . . Y N
3. Unique well name and number. .. . . . . . . . . . . . . . , . Y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. Well located proper distance from drilling unit boundary. . . . Y N
6. Well located proper distance from other wells.. . . . . . . . . Y N
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
8. If deviated, is wellbore plat induded.. . . . . . . . . . . . . . Y I N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . \ Y N
Af,RR DJ. TI1 12. Permit can be issued without administrative approval.. . . . . \ Y N
ff(~ .y¿"¡I?/ 13. Can permit be approved before 15-day wait.. . . . . . . . . . ~y N
ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . N
15. Surface casing protects all known USDWs. . . . . . . . . . . N
16. CMT vol adequate to circulate on conductor & surf csg. . . . . Y N .ç \
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . ~ ~c \c,,~ ~-\~\~. -. C;-.)\'" ()~ ,-<:1~\"~ CJr-... ~l
18. CMT will cover all known productive horizons. . . . . . . . . . Y N
19. Casing designs adequate for C, T, B & permafrost. . . . . . . Y N ,
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . N E' ~\ '::. -\ \ 'f'. ~ ~ t I t"\~ "E: ~~ ~Q: ~-\ .
21. If a re-drill. has a 10-403 for abandonment been approved. . . ~ ~ ~... ~ ... ('... I . '-' ~
22. Adequate well bore separation proposed.. . . . . . . . . . . . N C"\t~~C"..~\,~~"c.L~ \ Ù~\"\~\~\~ \ S'i~ ~C)~~\'v)\'t f'\~ea~CJ
23. If diverter required, does it meet regulations. . . . . . . . . . Y. N
24. Drilling fluid program schematic & equip list adequate. . . . . N
25. BOPEs. do they meet regulation. . . . . . . . . . ---' . . . . N .. C0... ('\ :\ - J '" - C"\,
26. BOPE press rating appropriate; test to ~~') psig. N ~ ~,,\' \>~~Mtc::.) ~~(V..~"{(~t\ \'-\~';>~ 0j;\-"~~C)~ \--\~\ ~\
27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N
28. Work will occur without operation shutdown. . . . . . . . . . . LN-
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y @.)
30. Permit can be issued w/o hydrogen sulfide measures. . . . . Y N /
31. Data presented on potential overpressure zones. . . . . . . Y N' ) //
32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y N / L/~ 1'7' .
AJ?PR - gATJ: 33. Seabed condition survey (if off-shore). . . . . . . . . . . . . Y N
I?f'/..- f'/2/~J 34. Contact name/phone for weekly progress reports [exploratory only] Y N
ANNULAR DISPOSAL35. With proper cementing records, this plan. ,. ~
(A) will contain waste in a suitable receiving zone; . . . . . . . Y N ~ ~
(B) will not contaminate freshwater; or cause drilling waste. " Y N
to surface;
(C) will not impair mechanical integrity of the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N
GEOLOGY: ENGINEERING: UIC/Annular COMMISSION:
~~a/ÇØé ~~ WM - 8~s Lnl
T~~lv1 ?>r I JMH
~. ftTE
kØ:-"\ \
GEOLOGY
APPR DATE
~~
c
0
Z
0
-I
:E
:::0
-I
m
""-\-0 ö..~-\~t"\ ~~ C).t\~~ \'-.:) ~ ~('... \ c::... '0'\ 0~~ ~ cr- ~t \
CA.~," ') ,,\...\~,~~~ \ ~~\- ~s. ~\~~ \""'- ~\" \.k\~\."
S(J~,-<t ~~\ f'.~ ~t--\I' "~Ñ\
Z
-I
:J:
en
»
::0
m
»
Comments/Instructions:
c:\msoffice\wordian\diana\checklist (rev. 11/01/100)
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readabiHty of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Memory Multi-Finger Caliper
Log Results Summary
II'
Company:
Log Date:
Log No. :
Run No.:
Pipe 1 Desc.:
Pipe 1 Use:
ConocoPhillips Alaska, Inc.
August 5, 2005
7511
1
3.5" 9.3 lb. L-80 EUE 8RD
Tubing & Liner
Well: 1 C-119
Field: Kuparuk
State: Alaska
API No.: 50-029-23034-00
Top Log IntvI1.: Surface
Bot. Log IntvI1.: 5,917 Ft. (MD)
Inspection Type:
Corrosive & Mechanical Damage Inspection
COMMENTS:
This log is tied into the mule shoe @ 5,798' (Driller's Depth).
This log was run to assess the condition of the tubing with respect to corrosive and mechanical damages.
The caliper recordings indicate the 3.5" tubing appears to range from good to fair condition. Wall
penetrations from 20% to 39% are recorded throughout the tubing logged. The damage appears in the form
of scattered pitting and lines of pits, eventually broadening circumferentially into areas of corrosion. Deposits
restrict the I.D. to 2.58" in joint 186 (5,917').
" . '-", "Uf' c'Þ ~" ")OÎ\~
SCj~ï\h~EU 1-'\ :1 (.., ;) I..." u.."
MAXIMUM RECORDED WALL PENETRATIONS:
Line of Pits
Corrosion
Line of Pits
Line of Pits
Corrosion
( 39%)
( 38%)
( 35%)
( 34%)
( 34%)
Jt.
Jt.
Jt.
Jt.
Jt.
123 @
165 @
124 @
142 @
176 @
3,900 Ft. (MD)
5,226 Ft. (MD)
3,935 Ft. (MD)
4,491 Ft. (MD)
5,548 Ft. (MD)
MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS:
No significant areas of cross-sectional wall loss (> 7%) are recorded throughout the tubing and liner logged.
MAXIMUM RECORDED ID RESTRICTIONS:
Deposits
Lt. Deposits
Minimum I.D. = 2.58"
Minimum I.D. = 2.79"
Jt.
Jt.
186 @
185 @
5,917 Ft. (MD)
5,900 Ft. (MD)
No other significant I.D. restrictions are recorded throughout the tubing and liner logged.
I Field Engineer: L Mills-Dawson Analyst: M. Lawrence Witness: C. Fitzpatrick
ProActive Diagnostic Services, Inc. I P.O. Box 13691 Stafford, TX 77497
Phone: (281) or (888) 565-9085 Fax: (281) 565-1369 E-mail: PDS@memorylog.com
Prudhoe Bay Field Office Phone: (907) 659-2307 Fax: (907) 659-2314
_) )Ùl-i>'t
~s,'
Well:
Field:
Company:
Coun try:
1 C-11 9
Kuparuk
ConocoPhillips Alaska, Inc.
USA
\ Tubing:
Nom.OD
3.5 ins
Weight
9.3 ppf
Grade & Thread
L-80 EUE 8RD
Penetration and Metal Loss (% wall)
_ penetration body
200
~ metal loss body
150
100
50
.
o 0 to
1%
1 to
10%
1 0 to 20 to 40 to ove r
20% 40% 85% 85%
Number of joints analysed (total = 193)
pene. 0 58 24 111 0 0
loss 18 175 0 0 0 0
Damage Configuration ( body)
100
80
60
40
20
o
isolated general line ring hole / poss
pitting corrosion corrosion corrosion ible hole
Number of joints damaged (total = 131)
91 40 0 0 0
PDS Report Overview
Body Region Analysis
Survey Date:
Tool Type:
Tool Size:
No. of Fingers:
Analyst:
Nom.lD
2.992 ins
August 5, 2005
MFC 24 No. 00387
1.69
24
M. Lawrence
Upper len.
1.2 ins
Lower len.
1.2 ins
Nom. Upset
3.5 ins
Damage Profile (% wall)
~ metal loss body
50
_ penetration body
o
O~
=-
~
~
~
=-
Ë
=
==
='
-iF"
I
48 I
-i:-
~
9;,~~
100
~.~ ' {:~
.':(-:\. \,
98"~"
I~
I =\ (:.~ ~
~ ~ .."'"' .l-
1-=,:; ¡=.....,
¡ .. \....~~t ~ \
.,!,,:;:¡!\~j\,"\',"
~\
r, '...... It. ",'-
~"
',~: .'=.~..
11Ö~:.~~; I
148.~~~
,,~ . \
i~\r
Bottom of Survey = 186
GLM 1
Analysis Overview page 2
t ~
PDSKEPORT JOINT TABULATION ~HEET
Pipe: 3.5 in 9.3 ppf L-80 EUE 8RD Well: 1 C-119
Body Wall: 0.254 in Field: Kuparuk
Upset Wall: 0.254 in Company: ConocoPhillips Alaska, Inc.
Nominal 1.0.: 2.992 in Country: USA
Survey Date: August 5, 2005
Joint Jt. Depth Pen. Pen. Pen. Metal Min. Damage Profile
No. (Ft.) Upset Body % Loss 1.0. Comments (% wall)
(Ins.) (I ns.) 0' (Ins.) 0 50 100
Yo
.1 31 0 0.04 16 0 2.91 PUP Shallow pitting. =-
1 34 0 0.03 10 ~ 2.89
1.1 65 0 0.02 9 ~ 2.93 PUP
1.2 72 0 0.03 12 ~ 2.93 PUP
2 82 0 0.02 8 ~ 2.95
3 114 0 0.02 8 2.95
4 149 0 0.02 6 2.94
5 180 0 0.03 10 ~ 2.95
6 212 0 0.02 8 2 2.96
7 243 0 0.02 8 2 2.93
8 275 0 0.02 8 ~ 2.96
9 306 0 0.02 8 ~ 2.96
10 338 0 0.02 8 2 2.90
11 369 0 0.02 8 0 2.93
12 401 0 0.02 9 2 2.94
13 432 0 0.01 6 2.90
14 463 0 0.01 6 2.96
15 495 0 0.02 8 2 2.96
16 526 0 0.02 7 2.94
17 557 0 0.02 8 2 2.96
18 589 0 0.02 8 2 2.95
19 620 0 0.02 9 :2 2.93
20 652 0 0..02 8 1 2.90 Lt. Deposits.
21 683 0 0.02 7 2 2.95
22 715 0 0.02 8 2 2.96
23 746 0 0.02 8 2 2.96
24 778 0 0.02 8 2 2.96
25 809 0 0.02 8 2 2.97
26 840 0 0.02 8 2 2.95
27 872 0 0.02 8 2.91
28 903 0 0.02 6 2.95
29 935 0 0.02 9 2 2.95
30 966 0 0.02 9 2 2.96
31 998 0 0.02 9 2 2.96
32 1029 0 0.02 8 2 2.96
33 1060 0 0.02 8 2 2.95
34 1092 0 0.03 11 6 2.94
35 1123 0 0.02 8 1 2.97
36 1155 0 0.02 8 2 2.96
37 1186 0 0.02 8 ') 2.96
38 1217 0 0.02 8 2 2.96
39 1249 0 0.02 8 2 2.96
40 1281 0 0.02 8 2.94
41 1312 0 0.02 8 2.96
42 1343 0 0.02 8 2 2.94
43 1375 0 0.02 7 1 2.94
44 1406 0 0.02 8 2 2.95
45 1438 0 0.02 8 2 2.94
46 1469 0 0.02 8 ') 2.96
47 1500 0 0.02 8 2 2.95
I Penetration Body
3!ii! Metal Loss Body
Page 1
PDS~'KfPORT JOINT TABULATION'~~HEET
Pipe: 3.5 in 9.3 ppf L-80 EUE 8RD Well: lC-119
Body Wall: 0.254 in Field: Kuparuk
Upset Wall: 0.254 in Company: ConocoPhillips Alaska, Inc.
NominaII.D.: 2.992 in Country: USA
Survey Date: August 5, 2005
Joint Jt. Depth Pen. Pen. Pen. Metal Min. Damage Profile
No. (Ft.) Upset Body °10 Loss 1.0. Comments (% wall)
(Ins.) (Ins.) (1<) (Ins.) 0 50 100
48 1531 0 0.02 8 2 2.96 f
49 1563 0 0.02 8 4 2.96
50 1594 0 0.02 8 2 2.96
51 1623 0 0.01 5 2 2.89
52 1655 0 0.02 8 2.94
53 1686 0 0.02 6 2.92
54 1718 0 0.03 11 2 2.87
55 1749 0 0.02 7 2 2.92
56 1781 0 0.04 14 2 2.96 Line of Shallow Pits.
57 1812 0 0.02 8 2 2.92
58 1844 0 0.02 8 .2 2.92
59 1875 0 0.05 19 2 2.95 Line of Shallow Pits.
60 1907 0 0.03 13 2 2.94 Line of Shallow Pits.
61 1938 0 0.03 10 2 2.92
62 1970 0 0.07 26 .2 2.92 Line of Pits.
63 2001 0.01 0.02 9 2 2.85 Line of Shallow Pits.
64 2033 0 0.05 19 2.88 Line of Shallow Pits.
65 2064 0 0.05 18 .2 2.88 Line of Shallow Pits.
66 2096 0 0.04 17 .2 2.93 Line of Shallow Pits.
67 2127 0 0.03 12 2 2.93
68 2159 0 0.05 20 2 2.95 Line of Pits.
69 2190 0 0.06 23 2 2.92 Corrosion.
70 2222 0 0.04 17 2 2.93 Line of Shallow Pits.
71 2253 0 0.06 23 2 2.93 Line of Pits.
72 2284 0 0.06 22 3 2.94 Line of Pits.
73 2316 0 0.06 24 .2 2.91 Line of Pits.
74 2347 0 0.06 24 2 2.94 Line of Pits.
75 2379 0 0.06 24 5 2.94 Line of Pits.
76 2410 0 0.05 20 4 2.92 Line of Pits.
77 2442 0 0.06 23 3 2.89 Line of Pits.
78 2473 0 0.06 24 3 2.91 Line of Pits.
79 2505 0 0.07 27 4 2.90 Line of Pits.
80 2536 0 0.06 24 3 2.90 Line of Pits.
81 2567 0 0.05 20 .2 2.94 Line of Pits.
82 2599 0 0.07 26 ') 2.93 Line of Pits.
:>
83 2630 0 0.07 26 3 2.92 Line of Pits.
84 2662 0 0.06 24 2 2.85 Line of Pits.
85 2693 0 0.07 . 28 2 2.92 Line of Pits.
86 2725 0 0.07 26 3 2.92 Line of Pits.
87 2756 0 0.06 24 4 2.91 Line of Pits.
88 2788 0 0.07 28 .2 2.91 Line of Pits.
89 2819 0 0.05 21 3 2.90 Line of Pits.
90 2851 0 0.06 24 .2 2.94 Line of Pits.
91 2882 0 0.08 30 4 2.95 Line of Pits.
92 2914 0 0.06 25 5 2.92 Corrosion.
93 2945 0 0.06 24 3 2.93 Corrosion.
94 2976 0 0.07 27 4 2.94 Line of Pits.
95 3006 0 0.06 22 3 2.90 Line of Pits.
96 3037 0 0.07 26 3 2.94 Line of Pits.
97 3069 0 0.05 20 .2 2.92 Line of Pits.
I Penetration Body
t~;~;~i"i Metal Loss Body
Page 2
~ ~
PDSkEPORT JOINT TABULATION~HEET
Pipe: 3.5 in 9.3 ppf L-80 EUE 8RD Well: lC-119
Body Wall: 0.254 in Field: Kuparuk
Upset Wall: 0.254 in Company: ConocoPhillips Alaska, Inc.
N ominaII.D.: 2.992 in Country: USA
Survey Date: August 5, 2005
Joint Jt. Depth Pen. Pen. Pen. Metal Min. Damage Profile
No. (Ft.) Upset Body 0/0 Loss I.D. Comments (% wall)
(Ins. ) (Ins.) (Y<) (Ins.) 0 50 100
98 3100 0 0.05 21 .2 2.93 Line of Pits.
99 3132 0 0.05 20 .2 2.92 Line of Shallow Pits.
100 3161 0 0.07 29 3 2.94 Line of Pits.
101 3192 0 0.08 31 3 2.91 Line of Pits.
102 3224 0 0.08 30 .2 2.91 Line of Pits.
103 3255 0 0.07 26 4 2.90 Line of Pits.
104 3286 0 0.06 25 3 2.89 Line of Pits.
105 3319 0 0.06 22 3 2.89 Corrosion.
106 3350 0 0.08 30 .2 2.90 Corrosion.
107 3382 0 0.07 28 3 2.89 Line of Pits.
108 3413 0 0.07 28 3 2.91 Corrosion.
109 3445 0 0.07 26 4 2.89 Line of Pits.
110 3476 0 0.06 24 3 2.88 Line of Pits.
111 3508 0 0.06 24 3 2.83 Line of Pits.
112 3539 0 0.06 24 3 2.93 Line of Pits.
113 3571 0 0.06 22 3 2.94 Line of Pits.
114 3602 0 0.06 24 3 2.87 Line of Pits.
115 3633 0 0.05 21 .2 2.89 Line of Pits.
116 3665 0 0.08 30 3 2.95 Line of Pits.
117 3696 0 0.07 26 2 2.94 Line of Pits.
118 3728 0 0.07 28 2 2.94 Line of Pits.
119 3759 0 0.07 26 4 2.93 Line of Pits.
120 3791 0 0.06 22 2 2.89 Line of Pits.
121 3822 0 0.07 28 .2 2.88 Line of Pits.
122 3854 0 0.08 32 2 2.89 Line of Pits.
123 3885 0 0.10 39 3 2.91 Line of Pits.
124 3917 0 0.09 35 3 2.89 Line of Pits.
125 3948 0 0.08 32 3 2.87 Line of Pits.
126 3980 0 0.06 24 .2 2.88 Line of Pits.
127 4011 0 0.06 24 2 2.89 Line of Pits.
128 4042 0 0.06 25 3 2.94 Line of Pits.
129 4074 0 0.07 29 4 2.94 Line of Pits.
130 4105 0.07 0.09 33 3 2.90 Line of Pits.
131 4137 0 0.07 29 .2 2.94 Line of Pits.
132 4168 0 0.08 33 3 2.94 Line of Pits.
133 4200 0 0.08 33 2 2.93 Line of Pits.
134 4230 0 0.07 29 3 2.93 Line of Pits.
135 4261 0.07 0.07 28 3 2.90 Line of Pits.
136 4293 0 0.07 26 3 2.90 Line of Pits.
137 4324 0 0.07 26 2 2.91 Corrosion.
138 4356 0 0.07 26 3 2.91 Corrosion.
139 4387 0 0.07 26 .2 2.92 Line of Pits.
140 4419 0 0.07 27 -. 2.93 Line of Pits.
.=>
141 4450 0 0.07 28 3 2.91 Corrosion.
142 4482 0 0.09 34 5 2.93 Line of Pits.
143 4513 0 0.08 31 3 2.93 Line of Pits.
144 4545 0 0.07 27 4 2.91 Corrosion.
145 4577 0 0.06 24 3 2.88 Line of Pits.
146 4608 0 0.06 23 3 2.91 Line of Pits.
147 4640 0 0.07 28 4 2.81 Corrosion. Lt. Deposits.
I Penetration Body
1~~'1 Metal Loss Body
Page 3
( ~
PDS KEPORT JOINT TABULATION sHEET
Pipe: 3.5 in 9.3 ppf L-80 EUE 8RD Well: 1 C-119
Body Wall: 0.254 in Field: Kuparuk
Upset Wall: 0.254 in Company: ConocoPhillips Alaska, Inc.
N ominaII.D.: 2.992 in Country: USA
Survey Date: August 5,2005
Joint Jt. Depth Pen. Pen. Pen. Metal Min. Damage Profile
No. (Ft.) Upset Body 0/0 Loss 1.0. Comments (%wall)
(Ins.) (Ins.) % (Ins.) 0 50 100
148 4671 0 0.08 31 ..., 2.82 Corrosion.
J
149 4703 0 0.06 25 3 2.83 Line of Pits.
150 4734 0 0.07 28 3 2.88 Corrosion.
151 4765 0 0.07 26 4 2.90 Corrosion.
152 4795 0 0.06 23 4 2.90 Corrosion.
153 4826 0 0.06 24 :2 2.87 Line of Pits. Lt. Deposits.
154 4858 0 0.06 25 4 2.87 Corrosion.
155 4889 0 0.07 27 3 2.89 Line of Pits. Lt. Deposits.
156 4920 0 0.05 20 4 2.89 Corrosion.
157 4951 0 0.06 22 6 2.88 Corrosion.
158 4982 0 0.06 24 6 2.92 Line of Pits.
159 5014 0 0.08 32 6 2.88 Corrosion.
160 5044 0 0.06 22 4 2.89 Corrosion.
161 5075 0 0.06 24 3 2.92 Corrosion.
162 5106 0 0.06 24 6 2.91 Corrosion.
163 5138 0 0.07 28 6 2.88 Line of Pits.
164 5169 0 0.06 25 3 2.88 Line of Pits.
165 5200 0 0.10 38 5 2.90 Corrosion.
166 5230 0 0.06 24 4 2.88 Corrosion. Lt. Deposits.
167 5261 0.05 0.07 27 4 2.92 Corrosion.
168 5293 0 0.05 21 :2 2.92 Corrosion. Lt. Deposits.
169 5325 0 0.07 28 4 2.91 Corrosion.
170 5356 0 0.06 25 3 2.92 Corrosion.
171 5386 0 0.06 23 6 2.90 Corrosion.
172 5417 0 0.07 29 5 2.90 Corrosion.
173 5449 0 0.07 26 4 2.92 Corrosion.
174 5480 0 0.07 27 4 2.91 Corrosion.
175 5511 0 0.06 24 3 2.91 Corrosion.
176 5543 0 0.09 34 3 2.91 Corrosion.
177 5574 0 0.06 25 5 2.92 Corrosion.
178 5605 0 0.07 26 6 2.92 Corrosion.
179 5637 0 0.05 21 5 2.92 Line of Pits.
180 5668 0 0.06 23 2 2.90 Corrosion.
180.1 5699 0 0.04 17 1 2.91 PUP Line of Shallow Pits.
180.2 5705 0 0 0 0 N/A GLM 1 (Latch @ 12:30)
1 80.3 5711 0 0.06 23 7 2.93 PUP Corrosion.
181 5717 0 0.06 22 6 2.93 Line of Pits.
181.1 5749 0 0 0 0 2.81 OS NIPPLE
182 5750 0 0.05 20 6 2.92 Line of Pits.
182.1 5781 0 0.05 19 5 2.88 PUP Line of Shallow Pits.
182.2 5787 0 0 0 0 N/A Seal Bore Extension
182.3 5799 0 0 0 0 N/A Mule Shoe
182.4 5801 0 0.06 22 :2 2.90 PUP Line of Pits. [
183 5811 0 0.05 20 6 2.92 Line of Pits.
184 5843 0 0.05 19 7 2.86 Shallow corrosion. Lt. Deposits.
185 5874 0 0.05 20 :2 2.79 Line of Shallow Pits. Lt. Deposits.
186 5901 0 0.07 28 2 2.58 Corrosion. Deposits.
I Penetration Body
!~JF: Metal Loss Body
Page 4
c&3." .. ...... .~.~.-..~...... ...
.- ·...n ê.tS
, - .iI·
PDS Report Cross Sections
Well:
Field:
Company:
Country:
Tubing:
1 C-11 9
Kuparuk
ConocoPhillips Alaska, Inc.
USA
3.5 ins 9.3 ppf L-80 EUE 8RD
Survey Date:
Tool Type:
Tool Size:
No. of Fingers:
Analyst:
August 5, 2005
MFC 24 No. 00387
1.69
24
M. Lawrence
Cross Section for Joint 123 at depth 3900.02 ft
Tool speed = 55
Nominal 10 = 2.992
Nominal 00 = 3.500
Remaining wall area = 98 %
Tool deviation = 80 0
Finger 7 Penetration = 0.099 ins
Line of Pits
0.10 ins = 39% Wall Penetration
HIGH SIDE = UP
Cross Sections page 1
cId...... _-.....-u~-.n-..-.._ -. -.. .--.'
.. -~~..
- ~
1"
PDS Report Cross Sections
Well:
Field:
Company:
Country:
Tubing:
1 C- 11 9
Kuparuk
ConocoPhillips Alaska, Inc.
USA
3.5 ins 9.3 ppf L-80 EUE 8RD
Survey Date:
Tool Type:
Tool Size:
No. of Fingers:
Analyst:
August 5, 2005
MFC 24 No. 00387
1.69
24
M. Lawrence
Cross Section for Joint 165 at depth 5225.55 ft
Tool speed = 48
Nominal 10 = 2.992
Nominal 00 = 3.500
Remaining wall area = 99 %
Tool deviation = 58 0
Finger 8 Penetration = 0.096 ins
Corrosion
0.10 ins = 38% Wall Penetration
HIGH SIDE = UP
Cross Sections page 2
.~- ).:-. --..... ..... '.. -".--
~s
~II
Well:
Field:
Co mpany:
Country:
Tubing:
PDS Report Cross Sections
1 C-11 9
Kuparuk
ConocoPhillips Alaska, Inc.
USA
3.5 ins 9.3 ppf L-80 EUE 8RD
Survey Date:
Tool Type:
Tool Size:
No. of Fingers:
Analyst:
August 5, 2005
MFC 24 No. 00387
1.69
24
M. Lawrence
Cross Section for Joint 186 at depth 5916.768 ft
Tool speed = 16
NominallD = 2.992
Nominal 00 = 3.500
Remaining wall area = 100 %
Tool deviation = 35 0
~~--~~
Finger 6 Projection = -0.284 ins
Deposits
Minimum I.D. = 2.58 ins
HIGH SIDE = UP
Cross Sections page 3
~PHILLlPS AlasL.t, Inc.
~ A Subsidiary of PHILLIPS PETROLEUM COMPANY
1C-119
TUBING
(0-5785,
00:3.500,
10:2.992)
SURFACE-
Mondxre
(0-57ffi,
00:5.500,
wt:15.50)
NIP
(5746-5747,
00:4.520)
NIP
(5785-5788,
00:4.500)
SBE
(5787-5788,
00:5.000)
SEAL
(5788-5789,
00:4.000)
SHOE
(5798-5799,
00:5.500)
Perf
(5986-6X(2)
Perf
(6002-OO22)
Perf
(6œ4-0072)
Perf
(6072-0092)
1
.
I
KRU
1C-119
API: 500292303400
SSSV Type: NONE
Well Type: INJ
Orig
Completion:
Last W/O:
Ref Log Date:
TD: 6606 ftKB
Max Hole Angle: 68 deg ~ 2429
Angle ~ TS: deg ~
Angle @ TD: 19 deg @ 6606
Rev Reason: Tag, PERF by ImO
Last Update: 4/18/2002
Annular Fluid:
Reference Log:
Last Tag: 6460
Last Tag Date: 4/14/2002
Casing String - ALL STRINGS
Description Size
CONDUCTOR 16.000
SURFACE- Monobore 5.500
SURFACE 3.500
Tubing String - TUBING
Size I Top
3.500 0
Peñorations Summary
Interval TVD
5986 - 6022 3698 - 3729
6054 - 6092 3757 - 3791
Gas Lift MandrelsNalves
St MD TVD Man Man
Mfr Type
1 5704 3461 CAMCO KBG-2-9
Other (:llugs, equip., etc.) - JEWELRY
Depth TVD Type
5746 3495 NIP
5785 3527 NIP
5787 3529 SBE
5788 3530 SEAL
5798 3538 SHOE
5799 3539 XO
6592 4258 SHOE WEATHERFORD FLOAT SHOE FOR 3.5" CASING
I Bottom
5785
Top Bottom TVD Wt Grade Thread
0 158 158 62.50 H-40 WELDED
0 5799 3539 15.50 L-80 BTC-M
5799 6594 4260 9.30 L-80 EUE8RD
TVD Wt Grade Th read
3527 9.30 L-80 EUE8RD
Status Ft SPF Date Type Comment
36 4 4/15/2002 IPERF 2.5" HSD HB Guns
38 4 4/15/2002 (PERF 2.5" HSD HB Guns
Zone
WSD
WSB
V Mfr
V Type V 00 Latch Port TRO
Date
Run
8/16/2001
Vlv
Cmnt
0.000
o
DMY
1.0
DK-1
ID
2.812
3.000
4.000
3.000
4.950
3.500
2.992
Description
CAMCO 'DS' NIPPLE WINO GO PROFILE
BAKER NO GO SUB w/4" BAKER DEBRIS SEAL SUB
BAKER 12' SBE
BAKER 80-40 GBH-22 SEAL ASSEMBLY
MULE SHOE FOR 3/5" MONOBORE TUBING
* ... +.. PEEL HE.;IIEP. *.. * ..
LDWG
02/1CI,'lì
.L..""15
IJ 1
.++.. TAPE HEADER ....+.
LD""lG
Ü2/11)l17
01
+... LIS C()HHEIIT P.£C()P.D + +..
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
LDWG FIle VersIon 1.000
Extra,:t FIle: LIST.:',FE. HED
TAPE H£AD£P.
t'JE51' S.~K UIIIT
H1V<JD/H;'D LOGS
:j:
v'JELL II.AH£:
J:.,P I ITUHB E P. :
OPE P~;'TOP.:
VJGC~I lIG COHPJ..JIi :
TAPE CP.E.I...1'I')¡¡ D,:',TE:
If
.JGB Dp,1';',
JOB ¡'¡UHBEP:
LOGGITTG EITGI1IEEP:
OPEP.ATOP. tVI TI lESS:
#
SUPF,I...CE LOr:}.,-TI01J
SEC1'IŒI:
TOT,lnISHIP:
pþJ IGE :
nrL:
F~,L:
EEL:
FWL:
ELE'v',;'TIOIJ 1FT FP'C,H
1<:ELL'1 BUSHIITG:
DEPRICE FLC"':'P':
GPCIUITD L£\.'EL:
#
¡¡.JELL C.l:..5, I riG P.ECC'P D
1ST STPIIIG
:UD 5TP.I!IG
JP.D 5Tp.IrIG
PPC'DUCTI,:,TT STP.IIIG
#
P Et-LL..P. ES :
HI;W P. U1 r 1
1
c. HEJ.'£P.
F. HEP.BEP.T
I.15L 0,
lC-119
500292303"¡ûCI
PhllllpS Alaska, Inc.
B::',r::EP. HUGHES ITT1'E'~
16-';:1,: t -1)2
Hii'.1D p.urr
1 P.
2
Hir7D PU1r 3
2
P.. P.ODP.IGUEZ
F. HEP.BEP.T
T. CHEIIG
F. HEP.BEP,1'
c9o/-/3O¡
II~J7
FEP PHILLI PS .~.L.L..S r:':', ST.!JIDI!JG OP.DEP. F'':'P v,JEST ~,,:'.E, THE
1:
llrr
10E
102.00
e'PEII HOLE ':ASI!IG DP.ILLEP.S
BIT SIZE I III 'I SIZE IIU) DEPTH 1FT I
2"¡ . I~ICIÜ
7.2,,' S
16.000
15:-:,.0
;:, ~:.O r,. CI
GAHHr., RAY CUF:""E fP.Of. THI S LOG I S THE DEPTH P.EFEP.EIJ':E
feW THI SWELL. ,;5 SUCH, JJO DEPTH SH I FTS !-L;'\"E BEEIJ
.!..PPLlED.
IIJDI'..rIDUAL HlvD RUIJ DÞ.T.r.. WAS Y.EFGED ITI THE FI ELD
PRIOR TO DE,LI'v'EP.Y Fp.or.¡ WELL SITE.
SURfACE LCICAT IOIJ:
L.i;T: IJ70 DEG 19' ,,)5.173"
LOIlG: Wl,,)9 DEG 30' 19.124"
LOG r.1E.;'SUP.ED fp.or'1 D. F. AT 10:. (I fT. ABO','"E PEPl.!. D.;'TUH
(H.S.L.) .
BJ~.EEP, HUGHES ITJTEQ RUIIS 1 THp'I,:::rUGH 3 UTILIZED HULTIPLE
PPI)PAG_;'TFm P.ESISTI'./IT'l' (f'1PR'¡ SEP.VICES IIJ A STEEP~;BLE
A55Er.1BLï Fp.'Jr.¡ 158 - E.t:06' HD (158 - ,,)272' T\..'D).
PEP, PAl GEOSCIEnCE P.EQUEST. THE CIJPVE "P.S60", A 60"
FI:ŒD DEPTH e'F rrflE5-TIGATIOIJ FESISTr.,.rITï PESULT
Fp.or.l IIJTEQ' S FOST PF.()CESS rIJG POUTI1IE 1 I-1PP.TEQ), 15-
IIJCLUDED IIJ THI S LD\'I7G I)UTPUT. HPP,TE',) PP.OC ESS rIJG
vJAS OITLY P,EQUESTED O"fEP. AIID IS ŒJLï PRESEITTED FOP.
THE IIITEP.VAL 5250 - 65~7' r.m.
1) 16" C.;SI!JG DEPTH - LOGGEF.: 158' HD 1158' rv"D)
16" CASIJJG DEPTH - DP.ILLEF.: 158' HD 1158' T\rD).
2) THE IIJTEP'./AL FP.OH .:?"¡5 TO 277 FEET HD 1,2"¡5-277' TVD')
WAS L()GGED 8.0 HOUP.S AFTEP. BEIIIG DP.ILLED DUE TO A
TP.I F TO CHAUGE A PLUGGED UIII\lEP5AL PULSEP..
3) PESISTIVITJ: D,;'TA O'".:EP. THE IIJTEP',rAL FP.OH 158 - 2.270'
1'1D (158 - 1783' T'.ID\ IS E:,:TP.EHELY EP.RATIC DUE T':'
DFILLIIJG THP.OUGH PEPHAfPOST.
.,¡) THE IIITEP:,lAL FP.OH 351].,) TO 3536 FEET HD 12~85 - 2298'
r./D) WAS LOGGED 10.5 HOUP.S ,r..FTEP. BEIITG DP.ILLED DUE
TO A TPIP TC' CHAlIGE THE BIT.
5) THE IIITEF.'v'AL FP.OH 656-1 - 6606' HD (,,)231 - -:127':'
TolD I vIAS !JOT LOGGED DUE TO SEIJSOP. OFFSET AT TD.
$
Tape Subflle: 1
75 records...
Hlnlmum record length:
I-Jaxlmurn rec.:.rd length:
2- bj'tes
132 bi"tes
~~~~ FILE HEADEP. +~+~
LDV'.TG
.001
102,,)
+ + + LIS CCHHEIIT PECC'P.D + + +
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
LDWG FIle VerSlon 1.000
Extract File: FILEOOl.HED
FILE HEADEP.
FILE IJTJHBEP.:
EDITED HEP.GED I,rulJD
Depth shlfted and
DEPTH IIIC:PE¡'¡ElIT:
#
FILE SU¡.IHAP.'{
PBlJ TOOL CODE
r,p;qO
$
1
cl1ppe.J. CUr":ES¡ all blt runs merged.
.5000
Sn~F.T DEPTH
158. C'
STOP DEPTH
':'56.,).0
"#
BA.SELIIIE CUP'.:E fr::'P' SHIFTS:
CIJP'\,'E SHIFT DATA ': 1.1E.;;SUF.ED DEPTH:,
- - - - - - - - - EQUI'vr.~.LE[IT U[JSHI FTED DE PTH - - - - - - - --
S¡:'.SELIIJE DEPTH
$
#
HEP.GED
PElT
[.rWD
HvJD
HWD
DAT.!:.. S,:;.uPCE
Tr)()L Cr':IDE
BIT pur I [IO I-IEPGE H)P
1 158.0
lA 225.0
2 348:.0
HEP.GE E..LoSE
2~5. (I
3482.0
¿;5¿.<J.0
:;.
1*
P EI.l~, 1<:S :
HEP.GED PASS.
PEP, PHILLIPS AL;;SY.A STPJJDI[JG ':'PDEP. FOP. WEST s.rú(, THE
GÞ.HHÞ. PAY CUP.VE fp',)[.r THIS LOG IS THE DEPTH P.EFEF.EIICE
FOP. THIS vJELL. AS SUCH, lJO DEPTH SHIFTS M'IE BEElJ
AFPLIED.
THE CUP.VE "P.S60" IS THE ¿.I)" fI:-:ED DEPTH OF IIr/ESTIG.;'-
TH)T-I PESISTr/IT"i PESULT FP.OB ITJTEQ' S 1'IPP.TEQ POST
PP'C,CESSIIIG P.OUTIIIE. IT IS PP.ESElJTED (),JEP. THE
IIJTEP.VAL FP.CH 5250 - ':'557' 1.'1[0 OULY.
$
#
.. ~.. IIIFOP1IATIOIT T.;'BLE: COIlS
I'!l1E [.l \i]:..L U
------------------------------
~\7D FIT
LCC
CIT
linT
FII
COUlJ
STAT
lel19 S.xcf
150
Phllllps Alaska, Inc.
lC-119
West Sak
rrorth SlOp02
.;;1 ask a
...... IITFOP.HÞ.TI':'IT TABLE: CIFO
I'U/EH CHlVI DHn ClJAH
ODEP
----------------------------------------------------
Gp. Gp. G P PH u.Ü
PPD PPD P.PD Ü. IJ
p.nr P.PH PP¡.1 0.0
P.PS P.PS PI'S u.O
F.P:-: FPX P. P:': O.u
PS~,O P.S60 P.E'.:.'¿-,O 0.0
P'C'P POP P''=:' P S 0.0
fET FET P.PTH 0.0
HTErr HTEU TCDH O. I)
.. FOPH;;T P.ECOP.D ITiPE# 64)
Da t a rec,:;,.r.,:;i c j'¡:.e 1 S : 0
Datum Fram02 Sl=e 15: 40 b;tes
Logq1ng dlrectl,:,n is .joun I':alue= 255,
Optlcal Log D02pth Scale Units: Feet
Frame spaclng: O.SI)I=IÜCIO
F.r:ame spaclng unlts: [f ]
IIumber of frames per recor,j lS:
C:rne depth per frame (.,'alue= I),
Datum Speclflcatlcn Block Sub-t7pe l3:
25
1
f PJ.l.! IE S P.;'C E =
I~I . 5 0 0 .. F
':,1)E DEPTH PEP. FPÞJ,IE
Tape depth IC': F
9 r:ur:e 5 :
IJam,= Tool Code Sampl,=s UnIts Sl::e Length
1 GP. HWD €,8 1 GAP I .,I .,}
- PPD HvID 68 1 Œ-IHH ..J ..J
3 F.PH HWD 68 1 Oill.IT. .,I .,¡
.,¡ P.FS ¡.1WD 68 1 Oill.n. .,¡ .,}
5 P.P:<: l-11rrD ~8 1 ''::'H1.IT. .,¡ .,}
t. P.S~.O TEQ ¿8 1 ..::rmu.. .,¡ 4
7 POP HWD ¿,8 1 FPHP. .,¡ ~
8 FET HWD t,8 1 HP. .,¡ .,¡
9 HTEH HWD ¡¿-.8 1 DEGF .,} ..J
-------
.) t.
Total Data Records:
516
Tape Flle Start Depth
Tape FIle End Depth
Tape F11,= Le-:el Spaclng =
Tape File Depth Units = feet
158.000000
6606.000000
0.500000
~~~~ FILE TPAILEP ~..~
Tape Subf11e: 2
567 records...
Hinlffium rec'='rd length:
MaXImum record length:
5 bytes
.,1124 bytes
~... FILE HEADER ....
LDWG
.002
102.,}
.¡. .. LI S COT,n,ETJT P,ECCrP.D .. ~
, , , , , , , , , , , , , , , , , , ,
. . . . . . . . . . . . . . . . . . .
LH,7G fll,= T.rerSlon 1.000
Extract Flle: FILEOl1.HED
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
FILE HEADEP.
FILE lTUHBEP:
PAW ¡,'!1l.7D
Cur~es and log header data for e3ch blt run In separate flIes.
BIT PUTJ JTr:): 1
DEPTH IT TCP.EHEITT :
#
FILE smn.L;.p:l
,rEIJDOp. TO'JL C":mE STAP.T DEPTH
}MD 150.0
$
-
.2500
STOP DEPTH
225.0
#
LOG HE,;DEP. DATA
DKTE LOGGED:
SOfT\¡Il.;PE
SUP.F.;'CE S':'FTV,7AP.E ',JEP.S IOrT:
DO,¡,mHr:'LE S'JFTTtJAPE T,lEPSIO!l:
D,;'TA T'l'PE I J.IEHOP.ï OF. P.EAL-THIE) :
TD DRILLEP. (FT',:
0 ì - ,MUG - 0 1
HSB 18655
4.75 J,!PP
I'lEl-IOR "¡
277.0
TOP LOG I rrTEP'vT.~ \ FT) :
B,)TT':::,I. L':::,G IIJTEP.'/.Z:..L / fT I :
BIT POTATIIJG SPEED (PPI.t,:
H'JLE 1IICL III.~T 10:)11 I DEG)
HIIJI HUH .rJJGLE:
HA.:OY.rm. .'VJGLE:
#
T,J()L STP,IIIG " TOP TO
\TElmOp TOOL C(:roE
DIP.
HPP,
G PAI'T
BOTT'JH)
Tù()L T'lPE
D1 P.ECT I OILrJ.
HULT. PEOf'.
GÞl'¡H;' PA";
PES-1ST.
$
#
BC'PEHOLE ,!ùm ':AS lUG ['.!.,TA
OPEIJ HOLE BIT SIZE (III I:
DP.ILLEP.'S C.~SI1!G DEPTH \FTI:
#
S(W, EHOLE C()! IDIT I ,:::,1 IS-
HUD TYPE:
HUD DEIJSIT".L (LB¡GI:
MUD VISCOSITY (5):
HUD PH:
HUD CHLC,PIDES I PPHI :
fLUID LOSS (C31:
p.ESISTr...'ITJ: I C:.HHHI ;'.T TEHPEPATUPE ([r£GF)
I.IUD AT I-IE;'.5UPED TEHPEPATUP.E I HT) :
HUD AT Hö.::< CIPCULATI [lG TEl I PEP}:I.TU P.E :
nUD fILTPATE .;:T nT:
HUD CAEE ::'.T ¡.IT:
#
HEUTP.OU TOC'L
r-t!..TPIX:
r.Lr:...TP,I:.: DEUS ITJ::
Hr:::'LE COP'P,ECTIOIf (' I Ii, :
#
TC¡OL ST.IùTDOFF (IIT I :
Dim FP.EQUEIICï (HZ,:
#
150.Ü
2~5.0
0
.0
.5
TOOL rJUl-IEEP.
I.¡PP. 1112
SP IG,5 350
7.875
158.0
FirJ GEL
8.75
.0
.0
0
.0
3.000
.000
.000
.000
74.0
.0
. ()
.0
.00
.000
. ()
I)
BIT P.Ulf 1 I TI1i'.TD P.Ulf 1).
GP./HPP. .
C UP.VE G LOS S.::'.P' J: :
GPAH - G.;.J.II.L~ PÞ,'l' .r:...PP;',PEITT (1.Ji¡\1D-API I
P.PCL - DEEP PHASE P.E.5ISTl'JITï ((¡HI.'ll'II
P.P5L - ¡'¡EDIUH FH.Z¡.SE PESISTI'/ITï (OHI.'ll.¡'
PFCH - SH.!..LL01¡'] H'L;'SE PES I STI',,'ITJ: t, ()H!,II.I,
P.PSH - E:,{TP.;' SH.:;LLC'~',] PH.r:...SE p.E.SISTrnT"¡
P.OPS - PATE Of PEITETP~;'Tl()1! (FFHP.,
PFTH - fC'PHl>.T!()IT E:-:H)SUPE TII-IE (lU IT)
TCDH - BC'P.EH':'LE TEI.IPEP.;'TUPE (DEGF)
$
PEI.IAP.Y.S :
#
+" + ITIFC'PHATIOIT T;'.6LE: COITS
EIfEl-! VALU
------------------------------
ItJDf(i
Lce
CIT
~'m
FIr
CC'UI!
ST;'.T
lc119.xtf
150
Phlllips Alaska, Inc.
1C-119
~'Jest S3.k
u.:..r th Slope
Alaska
I ()HT 'II,¡ I
.. + + I!JFCIRHATIO!J TABLE: CIn:,
HIJE!-I CH.:;JI DHIT CIIAl1
ûDEP
----------------------------------------------------
G Rl:J.I GP.AH G P_!:J.1 Ü.Û
RPCL PPCL PPCUI 0.0
P.PSL P,PSL PPCSLH Ü.O
P.PCH PPCH P.PC H1.' 0.0
PPSH P.PSH P.PCSH1.1 Ü. CI
P':)PS p.ûps POPS 0.0
RPTH P.PTH P. PTJ-n-I 0.0
TCDH TCmI TCDH 0.0
+ FC'Pl'IAT P.ECOR.D (T'iPE# 6"]¡
Data Lecord type lS: 0
Datum Frame Slze lS: 36 bytes
Lc.gglng .::I1rectlon 15 dmm (':a1ue= 255\
0pt1C31 Log Depth Scale Un1ts: Feet
Frame spaclng: Ü.2S(01)O
Frame spac1ng urucs: [f ]
TJumber of frames per record lS:
':'ne depth per fLame 1':a1ue= 0 ¡
Da turn Specl fica tlon B1 ad: Sub-type 1 s:
28
FPÞJ.IE SPACE =
0.250 + F
,.)IIE DEPTH PEP. FPANE
Tape depth ID: F
8 Cur'.'es:
I r ame Tc..:,l C,,:,de Samples Unlts
1 GP~;r.1 Hiim 68 1 GAPI
..., P.PCL Hlim 68 1 e'HHH
L
3 PPSL I.[V'JD 68 1 OHmr
.,¡ P.PCH H1ÄTD ':'ö 1 OHH[.J
5 P.PSH H1;11D 68 1 OHI.II-l
>3 P.OPS HWD 68 1 FPHP.
7 P.PTH 1. rv-m 68 1 IHUS
8 TCCH I.r;rJD 68 1 DEGF
'sl::e
Length
.,¡
4
4
.,¡
.,¡
.,¡
.J
..¡
.,¡
.,¡
.,¡
4
.,¡
.,¡
.,¡
.,¡
-------
32
Total Data Pecords:
11
Tape Flle Start Depth
Tape flle End Depth
Tape Flle Le~'el Spaclng =
Tape Flle Depth VDlts = feet
lSO.ÜÜOOOÜ
225.01)00ÜO
0.250000
+..+* FILE TPAILER *++*
Tap,;: Subflle: 3
SO rec.:,rd 5 . . .
!Ünlmum Lece,r:d length:
HaXlmum r:ecoLd length:
8 b~'tes
.,112.,) bj'ces
++++ FILE HEADEP. ++++
LHJG
.003
1024
+ ¡,. + LI S COl'-IHEIIT PECOP.D + + +
!~!~!~!~!!~!!!~!!!!
! ! ! ! ! ! ! ~ ! ! ~ ! ! ! ! ! ! ! !
LDWG FIle VersIon 1.000
Extract FIle: F1LE012.HED
FILE HEADEP.
FILE TlUHBEP.:
PAW HWD
Cur':es and
B1 T purl IlO:
DEPTH IIlCP,EHEIJT:
#
F I 1. E S TJHHA.P, Y
'1EIJDOP Tr.")OL CC'DE
Hv7D
$
oJ
log header data for each bIt run In separate flIes.
lA
.Z500
ST.!"'PT DEPTH
STOP DEPTH
3.,182.0
225.0
#
LOG HEADEF. DAn;,.
DATE V:::'GGED:
SOFTtl7APE
SUP.FACE SOFHJAP.E './EP.s I,:m:
DorrnrHOI.E SOFTT/l7.;'PE VEPSI,.::m:
DATA T:LPE (HEHOPï ,)P. P.EAL-TUlE I :
TD DP.Il-LEP. (FT):
T,JP LC)G IlTTEP"IA1. I FT I :
BOTTOH LOG IlTTEP.VAL 1FT):
BIT P.OTATITTG SPEED (P.H!):
HOLE IJTCLIJTATI'JlT (DE G)
¡UUHITJH AlrGLE:
HAZIHUH AlJGLE:
#"
TO'')L STP.IUG (TOP TC'
'IEI][II':,P' T':'OL C'::'DE
DIP.
HPP.
GR;;I,1
BC'TTCH 1
TOC'L T";PE
D1P.ECTIOlTA1.
HULT. PP.OP.
G.AH!, L;' P.A".l
PESIST.
.,/
#
BOP.EHC)LE -i;]TD ':AS IIJG DATA
OPEII HOLE BIT 5I ZE !ITT I :
DP.ILLEP'S (:.;'SIITG DEPTH I,FT):
#
BOPEH'::'LE C'JJTDITIOlTS
HUD riPE:
I,IUD DElTS I TJ: (1.6/ G ,I :
I.'lUD ',/I SC':'SITJ: IS,:
I.IUD FH:
MUD CHLORIDES (PPMI:
FLUID LOSS (C3):
RESISTIVIT:': IOHUW AT TEHPEF~;'TUP.E (DEGF)
I'IUD ;;T I-IE.;;SUP.ED TEHPEP~-;TUP.E I HT) :
HUD AT ¡':IA:': CIP.CU1.ATITTG TEHPEPATUP.E:
I.IUD FILTPATE ,;'T T.IT:
I:IUD CÞJ-Œ AT ¡'IT:
It
lTEUTP.OlT T()CIL
HATF. I:.: :
rL1~..Tp.I:': DElIS IT:': :
HX,E COP.P.ECTIOII ! 1]]:1:
#
TOOL ST.;]][":ÆF (III I :
Ev7P. FF.EQUElIC:L (HZ':
#
09-AUG-Ol
HSB 18655
.,1.75 HPP.
¡,IE J.IrJp. ï
353':'.0
:25.0
3.,182.0
0
.4
':'7.6
TOOL IJUHBEP.
HPP. 1112
SP.IG5350
7.875
158.0
FW GEL
9.00
.0
.0
550
.0
.000
.000
.000
.000
.0
.0
.0
.0
.0(1
.1:100
. I)
0
P.E!'L~,]<:S :
81 T PU¡¡ L~ (HWD P,U!! 2,.
GP./I.1PP..
':UP'\'E GLrJSS;'.P"¡:
GPAH - G.r..Hl.Lc., P;':l' '-;PP.~, E!IT (HWD- .~P I I
P.PCL - DEEP PH.T:..SE PESISTI\'ITï IOHHH,I
P.PSL - HEDIln.1 PH.Zl.SE PESISTI'.¡'ITY IOH1.n'I,1
PPCH - SHALLOW PH.f..SE P.ESISTIVIT"i (()ill.n.I,
PPSH - EXTP-;' SH.IU.LOt-l PH.;'SE PES I STIVI TY
POPS - R;'TE '::,F PEIIETPATIOII (FPHP. I
PPTH - FC'PJ.L1I..TIO!1 EXPOSUP.E T HIE (HITI)
TCDH - ß.JP,EHOLE TEHPEPATUP,E l DEGF I
l Of-a.n.r ,i
$
"It
+ + + IIIFûPHATIOIT T.r..ßLE: COITS
[.lIIEI.l '/ALU
------------------------------
WDFIJ
Lee
CII
WIJ
FII
COU1!
STAT
1,:;119.xtf
150
Phill1pS Alaska, Inc.
1C-119
West Sak
IIor th Slope
Alaska
++.. I!IFOPJlÞ.TIOlJ TABLE: CIF(j
H1JH'! CH.ZùI DIHT CIUd.l
,)DEP
----------------------------------------------------
GPJ:J 1 G P ~;'H GRAH 0.0
P.PCL P.PCL P,P':UI 0.0
P.PSL P.PSL PPCSLH 0.0
PPCH PPCH PPCHH 1).0
PPSH P,PSH P.PCSHl-I 0.0
POPS P'I:'P S POPS C).O
P.PTH P.PTH P.PTHH 0.1)
TCDH TCDH TCD¡.r 0.0
+ F 0 PHr.. T P.ECOP.D ITiPE# 6"\)
Data record t~'pe 15: Ù
Datum Frame Sl~e 1S: 36 b~te5
Lc'gging dire,:tl,:,n lS -::IO\-J!ì 1':,:Ül..le= 2551
0pt1cal Log Depth Scale Un1ts: Feet
Frame spac1ng: 0.250000
Fr~me spacing un1ts: [F 1
[JLlUÙ)er of frames per record 15:
'Jne depth per frame (':al'Lie= 0.1
Datum Spec1flcat10n Blc,ck .s.ub-t~'pe 15:
28
1
FP.A1!E SP.;'CE =
0.251) + F
C'1JE [,EPTH PEP. FP)\HE
Tape depth ID: F
8 Cur:es:
1Iame Tool
Code Samples Un1t3
Sl::::e
LE:ngth
1 GPþJ.I HiJD 68 1 GAPI
'" P.PCL Ht\JI) ¿8 1 e, HUH
.:...
, P.PSL [. J1,'.j[r 6.j 1 C,HHI.!
-'
~ P.PCH H1i'1ú ¿,,~ 1 ,:,HHII
~
..
.,\
.,
.,\
..
.,¡
.,\
FILE HEADEP.
FILE JTUHBEP.:
RA1r7 I.'I1iIJD
Cur~es and log headeL data for each bit run in 5epaLate flIes.
BIT pun IlO: ?
DEPTH IJJCREJ:TEJJT:
#
FILE SUI,UIKP.'¡
'.,TEIIDOP TCu::rL I:ODE STAP.T DEPTH
DvJD
$
5 P.PSH HWD ~,8 1 OHHH 4 4
¿, P. C' P S r.rvm ~,8 1 FPHP 4 4
7 P.PTH HWD ':.8 1 T.n II S 4 4
e TCDf.1 HvIl) .:,::: 1 DEGF 4 4
-------
32
Total Data P.ecords: 4 ¿,¿,
225.000000
3 ..¡ ~: 2 . 0 I) I) Ü 0 0
0.250000
Tape Flle Start Depth
Tape F1Ie End Depth
Tape F1Ie Le':el Spaclng =
Tape File Depth Unlts = feet
*+** FILE TPAILER ++**
Tape 5ubflle: ..¡
552 records...
lhnimum re-coLd length:
Ila:.::1 mum re cord 1 e ng"th:
8 bJ'"tE5
412.,\ bJ."tes
**** FILE HEADEP. +***
LD1rJG
.00"\
1024
* * * LIS c,,::;rr,IHElfT F.EC":'PD * * +
! ! ! ~ ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
LDWG F1Ie VeL 51 on 1.000
ExtLact File: FILE013.HED
.,¡
.2500
3482.0
STOP DEPTH
65 ¿,q . I)
#
LC'G HE.;DEP. DATA-
DATE LOGGED:
SrJfTWAP.E
SUP.FACE SOfH'.TAPE VEP.SIOII:
D')WJJHOLE SOFT1¡'7AP.E \.TEP.S lOll:
DATA TYPE IJ.IEI1C'P'i OP. PEÞ.L-TIIIEI:
TD DP.ILLEP 1FT):
T':'P LC'G lITTEP'.lAL I fT I :
B'')TTC'H LC'G IIJTEP,\'hL I FT I :
BIT P'C'T,;'TIJIG SPEED (P.PI.!I:
HOLE II ICLIIIAT I r:rIJ 1 DEGI
IUIIUíUH }úJGLE:
n;::<:IHUI. AlJGLE:
#
TOC'L STP.IIIG (TOP TO E,I:::'TTC)J,ll
'"lETJDC'P TC'OL CODE T,:<:rL T'.LPE
DIP. DlP.ECTI':'IJ.;'L
J.IPP J.1ULT. PP'I:'P. PES I ST.
1I-,~UG-01
HSB 18>::.55
4.75 JIPF.
BEl-rop.....
660~,. 0
3 ~ 8 2 . 1:1
656"'¡.0
0
It:.9
65.5
TC{)L JJTJHBEP.
HP F 1 11 .:
GP~;'¡-I
GAH1.t; P};Y
$
#
BOP.EHrJLE AIID c.~S IIJG DAT.;
OPEII HOLE BIT SIZE (IIJ):
DP. I LLEP. 's c.;s I UG DE PTH I FT) :
#
BOP,EHOLE COlJDI TIOlJS
HUD TYPE:
HUD DEIISITY (LB.:G):
I-'IUD 'JISC()SITY (S,:
l-IUD PH:
I.IUD CHV:,P.I[,ES f PPH,I :
FLUID LOSS (C3):
P.ESI STI"llT"l I OHHH I .~T TEHPEPATUP.E ([,EGF ,I
HUD AT HE.~SUP.ED TEI-IPEPATUP.E (J.IT I :
I.ruD .:"T I,L;:x: CIP.':UL.~TIIJG TE¡'¡PEPATUPE:
[.ruD F1LTPÞ,TE AT HT:
¡.rUD CAI':E AT HT:
#
TJEUTP.OII TOOL
IJLZ\TP.D~ :
n;:¡.Tp.1:-': DETJS IT';:
HC'LE COP.PECTI':'II I ITJ I :
#
T.:":,L ST.ZùTDOFF (ITJ,:
E~'IP. FP.E'':;'UE1Jr:Y (HZ':
#
SP,IG5350
7.875
158.0
FW GEL
9.25
. (I
. Ü
400
.0
.000
. (1)0
.000
.000
.0
.0
.0
. (I
.00
.000
.0
(I
B1 T P.UIi 2 I, HWD P.UIT 3).
GR/I.IP P. .
THE CUP",IE P.S60 IS OIIL'¡ PP,ESEIJTED O'vTEP. THE ITJTEP.'v'AL
5 2 5 0 - 65 5 7' r.m.
CUP.'/E GL,:'SSAP,ï:
GP J.J.l - GAl.n'L~ P.A.l: .:..p P AP.EIiT I HHD- AP I )
P.PCL - DEEP PH.;'SE P.ESISTI'v'IT"! (OHHI-'I)
P.PSL - I-IEDIUl-1 PHASE P.ESI5TI'v'IT".L (\:'HHH¡
P,PCH - SH..:"LLCIV',7 PH..:"SE P.ESISTI",lITi I 0 HI.'ll-I I
P.PSH - EXTP).. SH..;'LLC'T!J PHASE P.ESISTIV1TJ: ('JH1.n.l¡
P.S 60 - HPP.TEQ 60" F1:-:ED DEPTH 'JF nrvTEST. P.ES IS. (OHHH I
PC'PS - PATE OF PE[]ETP~;'TIC'TJ I FPHP. ¡
P.PTH - FOP1'Lz..TIOIJ D:P')SUP.E T IHE (HIITi
TCDH - B')P.EH()L£ TEHPEP.Þ.TUP,E (, DEGF)
c:
.."
P. E. HAP. l<: S :
#
.. ,,"" ITJF'JP.[t~TIOTJ T.;'BLE: r:OTJS
I.II J Ell V'ALU
------------------------------
\,..JD f II
LCC
ClJ
~'.nT
FII
COUII
STAT
1cl19.:-:tf
150
Phll1ips Alaska, Inc.
lC-119
vJ"e 5 t 5 a t
IJorth Slope
,r.,laska
.. + + nTFC'PI.U...TIc,rr T.c..BLE: CIn:;.
H[]EH CI-!.ÞJI DIl-IT crrMl [
CtDEP
----------------------------------------------------
GP_l\j.l GPþJ.l GP)"J.[ 0.0
PPCL P.PCL PP":U'I Ü.O
P.P5L P.PSL P.PCSU[ Ü. I)
P,PCH P. F' C H P. Pi: Hf.I Ü.Ü
PP~H PP5H PPC5H1. 0.0
P'S¿,I] RS6û F.ESGO 0.1]
P'I)PS R,JPS POPS O. (I
P.PTH P.PTH P.PTH1.1 O.ü
TCDH TCDì1 TC N! (I. Ù
* Fe) Fl-lA T PECOFD (,T"fFE# ,;:,~)
Data Lecord type IS: I]
Datum FLame SIze lS: ~O bJ'tes
LoggIng dIrectIon lS .:k,Mn I':alue= 255)
OptIcal Log Depth Scale UnIts: feet
Frame spac1ng: 0.250ûOO
frame spa':lng unIts: [F ]
¡¡umber of frames per record 15:
'Jne depth per fLame \ ':alue= Ij I
Datum Speclflcat10n Blod; Sub-tJ'pe IS:
25
1
FPþJ.!E SP.Z:..CE =
0.250 + F
01JE DEPTH PEP. FP}J.TE
Tape depth ID: f
9 Cur':es:
I J ame To,:.l Code Samples Urn t.5 51::e Length
1 GP.AH IIVI1D 68 1 G.:!:..PI .J ~
.2 P.PCL Him 68 1 OHHI-I .J -I
3 PPSL Hli'JD 66 1 ,:'HHJ.! -I -I
-I PPCH Hv.1D 68 1 ()HHH .J -i
5 PPSH HWD E.8 1 (:rH r. IJ.! .J -I
6 P.S60 TEQ 68 1 OHI.n.r -:I .:
.., P.OPS HWD 68 1 FPHP. ..¡ -I
I
8 PPTH nWD 68 1 ['!I [IS -:I ..}
9 1'CD1-1 HírJD 68 1 DEGf -I .J
-------
36
Total Data Fecords:
500
Tape fIle Start Depth
Tape FIle End Depth
Tape F1le Le':el Spac1ng =
Tape F11e Depth Un1ts = feet
348.2.000000
660¿.OOOOOO
0.250ÛOO
*++* FILE TRZ:..ILEP. ++++
Tape Subf11e: 5
590 rec,:.rds...
¡-ilnlmum rece,rd length:
[.!aXlmüm .record lo:=ngth:
8 t,~'tes
-112-1 bytes
*++* TAPE TR~ILEP ++++
Lm,TG
02/10/17
01
~~++ REEL TPAILEP ++++
LDWG
02/10/17
,~,WS
01
Tape Subfl1e: 6
IÜnlmurn ree.::..r:d length:
Hay.imum record length:
2. records...
132 bytes
132 b~'tes