Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout218-0511. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program
Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Tubing Patch
Development Exploratory
Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number): 8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured 9811'feet 9150'feet
true vertical 6405' feet None feet
Effective Depth measured 9150'feet 4946', 4967',5486'feet
true vertical 6417' feet 4106', 4122', 4508'feet
Perforation depth Measured depth
True Vertical depth
Tubing (size, grade, measured and true vertical depth) 4-1/2" x 3-1/2" L-80 5519' MD 4534' TVD
Packers and SSSV (type, measured and true vertical depth) 4946' MD
4967' MD
5486' MD
N/A
4106' TVD
4122' TVD
4508' MD
N/A
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure: N/A
13a.
Prior to well operation:
Subsequent to operation:
13b. Pools active after work: Kuparuk River Oil Pool
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Authorized Name and
Digital Signature with Date: Contact Name:
Contact Email:
Authorized Title: Contact Phone:
N/A
Sr Pet Eng: Sr Pet Geo: Sr Res Eng:
WINJ WAG
~
Water-BblOil-Bbl
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
N/A
Packer: PIIP Patch Packer
Packer: PIIP Patch Packer
Packer: Baker 190-47 Seal Assembly
SSSV: None
Shelby Sumrall
shelby.sumrall@conocophillips.com
(907) 265-6678Well Integrity Specialist
Slotted Liner: 8601-9139' MD
Slotted Liner: 6416-6416' TVD
measured
true vertical
Packer
Representative Daily Average Production or Injection Data
Casing Pressure Tubing Pressure
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
~
Gas-Mcf
MD
~
Size
79'
~ ~~
Well Remains Shut-In ~~
~
measured
TVD
7"
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
218-051
50-029-20872-01-00
P.O. Box 100360
Anchorage, AK 99510
3. Address:
ConocoPhillips Alaska, Inc.
N/A
5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work:
ADL0025640
Kuparuk River Field/ Kuparuk River Oil Pool
KRU 1G-07A
Plugs
Junk measured
Length
Production
Slotted Liner
8808'
549'
Casing
6414'
2-3/8"
8836'
9139' 6416'
2457'
79'Conductor
Surface
Intermediate
16"
10-3/4"
49'
2487' 2367'
Burst Collapse
Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov
By Grace Christianson at 1:27 pm, Aug 13, 2024
Digitally signed by Shelby Sumrall
DN: OU=Alaska, O=Conocophillips, CN=Shelby
Sumrall, E=Shelby.Sumrall@conocophillips.com
Reason: I am the author of this document
Location: Anchorage Alaska
Date: 2024.08.13 10:32:54-08'00'
Foxit PDF Editor Version: 13.0.0
Shelby
Sumrall
DTTMSTART JOBTYP SUMMARYOPS
7/22/2024 REPAIR
WELL
SET 1" OV @ 4091' RKB (1/4" PORT), PULLED 3.81 DBP PLUG @ 5538' RKB,
BRUSH & FLUSH TBG FROM 5000' TO 4800', CLEAN DUMMY 3.76" x 23' DUMMY
PATCH DRIFT TO 5000', SET LOWER 3.76" P2P @ 4970' RKB (CE) (OAL 4.89' /
SN:CPP45006), SET 4 1/2 TTS TEST TOOL IN 3.76" P2P @ 4970' RKB CMIT TBG
x IA 2500 PSI (PASS). IN PROGRESS.
7/23/2024 REPAIR
WELL
PULLED 4 1/2 TTS TEST TOOL @ 4970' RKB, SET UPPER 3.76" P2P SPACER
ANCHOR LATCH @ 4949' RKB (CE) TOP @ 4945.92' RKB, SET 4 1/2 TTS TEST
TOOL IN UPPER 3.76" P2P @ 4946' RKB MIT TBG 2500 (PASS) CMIT TBG x IA
2500 PSI (PASS), PULLED 4 1/2 TTS TEST TOOL @ 4946' RKB. JOB
COMPLETE.
1G-07 Patch
Sumary of Operations
Last Tag
Annotation Depth (ftKB) Wellbore End Date Last Mod By
Last Tag: RKB 7,898.0 1G-07 5/5/2018 zembaej
Last Rev Reason
Annotation Wellbore End Date Last Mod By
Rev Reason: Set OV, Pull Plug, Set Patch 1G-07 7/23/2024 bworthi1
Notes: General & Safety
Annotation End Date Last Mod By
NOTE: (INCONCLUSIVE IMPRESSION). ...RETURN AT LATER DATE TO TROUBLE SHOOT
OBSTRUCTION
10/29/2016 pproven
NOTE: UNABLE TO PASS 7821' SLM WITH 2.67" MAGNET. MADE 2.74" LIB RUN TO SAME 10/28/2016 pproven
NOTE: WO 10/20/2016 pproven
NOTE: CVs @ 7840' & 8031 RKB slightly eroded 6/9/2001 WV5.3
Conversio
n
NOTE: WO 9/5/1988 pproven
Casing Strings
Csg Des OD (in) ID (in) Top (ftKB)
Set Depth
(ftKB)
Set Depth
(TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread
SCAB LINER 4 1/2 3.96 5,477.8 8,002.5 6,435.2 12.60 L-80 IBTM
Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string
Top (ftKB)
8,019.1
Set Depth
8,097.2
Set Depth
6,503.1
String Max No
3 1/2
Tubing Description
Tubing Completion Lower
Wt (lb/ft)
9.30
Grade
J-55
Top Connection
EUE 8RD
ID (in)
2.99
Completion Details: excludes tubing, pup, space out, thread, RKB...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal
ID (in)
8,030.7 6,455.5 44.08 PRODUCTION 5.960 MERLA TPDX 2.875
8,039.9 6,462.1 44.15 NIPPLE 4.540 OTIS X NIPPLE 2.813
8,063.8 6,479.2 44.32 SEAL ASSY 4.500 BAKER SEAL ASSEMBLY w/ 5'
SEALS
3.000
8,064.7 6,479.8 44.32 LOCATOR 4.500 BAKER LOCATOR 3.000
8,066.0 6,480.8 44.33 PACKER 5.875 BAKER FB-1 PERMANENT
PACKER
4.000
8,069.4 6,483.2 44.36 SBE 5.000 SEAL BORE EXTENSION 4.000
8,084.5 6,494.0 44.46 NIPPLE 4.540 CAMCO D NIPPLE NO GO 2.750
8,096.2 6,502.4 44.54 SOS 4.570 BAKER BALL SEAT SHEAR SUB,
ELMD TTL @ 8100 during PPROF
on 4/19/2006
3.000
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ftKB)
Top (TVD)
(ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in)
8,020.0 6,447.8 44.01 CIBP 4/28/2018 0.000
8,084.4 6,493.9 44.46 NIPPLE
REDUCER
NIPPLE REDUCER 2/6/1998 2.250
8,357.0 6,685.6 45.93 FISH A-2 Blanking Plug & Junk
Basket Left in Tailpipe below
milled up PKR; See
HandOver Form 9/6/88
9/5/1988 0.000
Mandrel Inserts : excludes pulled inserts
Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°)
St
ati
on
No
/S Serv
Valve
Type
Latch
Type
OD
(in)
TRO Run
(psi) Run Date Com Make Model
Port
Size (in)
8,030.7 6,455.5 44.08 5 PROD CV RM 1 1/2 0.0 7/26/2007 open Merla TPDX 0.000
Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal ID
(in)
5,477.8 4,502.6 40.63 PACKER 7.000 Baker ZXP Liner Top Packer Baker HRD-E
ZXPN
5.500
5,538.4 4,548.7 40.39 NIPPLE 4.500 DB Nipple 3.813" Ser #3655-2
IBTM Box x Pin
3.813
7,949.0 6,396.5 43.54 Landing Collar 4.500 Landing Collar IBTM Box x Pin 3.950
Perforations & Slots
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Linked Zone Date
Shot
Dens
(shots/ft)Type Com
7,894.0 7,946.0 6,356.5 6,394.3 C-4, C-3, 1G-07 9/1/1988 12.0 APERF 120 deg. Phasing
7,978.0 8,013.0 6,417.5 6,442.8 C-1, 1G-07 9/1/1988 16.0 APERF 12 @ 120 deg 4 @ 90
8,217.0 8,238.0 6,587.7 6,602.5 A-4, 1G-07 1/14/1983 12.0 IPERF 120 deg Ph; GeoVann TCP
8,253.0 8,273.0 6,613.0 6,627.0 A-3, 1G-07 1/14/1983 12.0 IPERF 120 deg Ph; GeoVann TCP
Cement Squeezes
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Des Com
Pump Start
Date
6,550.0 8,020.0 5,337.8 6,447.8 Liner Cement 5/1/2018
1G-07, 8/9/2024 9:25:20 AM
Vertical schematic (actual)
A LATERAL; 8,590.0-9,138.6
PRODUCTION; 28.0-8,836.1
FISH; 8,357.0
IPERF; 8,253.0-8,273.0
LINER TOP; 7,894.0
IPERF; 8,217.0-8,238.0
SOS; 8,096.2
NIPPLE; 8,084.5
NIPPLE REDUCER; 8,084.4
SBE; 8,069.4
PACKER; 8,066.0
LOCATOR; 8,064.7
SEAL ASSY; 8,063.8
NIPPLE; 8,039.9
PRODUCTION; 8,030.7
CIBP; 8,020.0
SCAB LINER; 5,477.8-8,002.5
FLOAT SHOE; 8,000.9-8,002.5
APERF; 7,978.0-8,013.0
Liner - Pup; 7,949.9-7,970.0
Landing Collar; 7,949.0-7,949.9
APERF; 7,894.0-7,946.0
WHIPSTOCK; 7,903.0
AL1 LATERAL; 7,894.3-10,608.0
DEPLOYMENT SLEEVE;
7,894.3-7,895.1
Liner Cement; 6,550.0 ftKB
Liner - Pup; 5,540.0-5,549.8
NIPPLE; 5,538.4-5,540.0
Liner - Pup; 5,524.8-5,538.4
XO Reducing (Casing); 5,523.4-
5,524.8
SBE; 5,503.7-5,523.4
SEAL ASSY; 5,485.6
HANGER; 5,494.4-5,503.7
PACKER; 5,477.8-5,494.4
LOCATOR; 5,483.9
GAS LIFT; 5,433.3
PACKER - PATCH - LWR;
4,967.0
LEAK - TUBING; 4,960.0
SPACER PIPE; 4,950.7
PACKER - PATCH - UPR;
4,946.0
GAS LIFT; 4,937.4
GAS LIFT; 4,091.1
GAS LIFT; 2,659.5
SURFACE; 29.7-2,487.0
FLOAT SHOE; 2,485.2-2,487.0
CONDUCTOR; 30.0-79.0
HANGER; 29.7-34.0
HANGER; 28.0-33.0
HANGER; 25.6
KUP PROD
KB-Grd (ft)
29.99
RR Date
1/14/1983
Other Elev
1G-07
...
TD
Act Btm (ftKB)
8,851.0
Well Attributes
Field Name
KUPARUK RIVER UNIT
Wellbore API/UWI
500292087200
Wellbore Status
PROD
Max Angle & MD
Incl (°)
47.15
MD (ftKB)
8,600.00
WELLNAME WELLBORE1G-07A
Annotation
Last WO:
End Date
5/3/2018
H2S (ppm)
50
Date
8/22/2017
Comment
Last Tag
Annotation Depth (ftKB) Wellbore End Date Last Mod By
Last Tag: RKB 7,902.0 1G-07A 5/8/2018 pproven
Last Rev Reason
Annotation Wellbore End Date Last Mod By
Rev Reason: Tubing leak added @ 4960' RKB & OV pulled from 4091' 1G-07A 7/12/2024 jconne
Notes: General & Safety
Annotation End Date Last Mod By
NOTE: jennalt
Casing Strings
Csg Des OD (in) ID (in) Top (ftKB)
Set Depth
(ftKB)
Set Depth
(TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread
CONDUCTOR 16 15.06 30.0 79.0 79.0 62.50 H-40 WELDED
SURFACE 10 3/4 9.95 29.7 2,487.0 2,367.0 45.50 K-55 BTC
PRODUCTION 7 6.28 28.0 8,836.1 6,413.7 26.00 K-55 BTC
A LATERAL 2 3/8 1.99 8,590.0 9,138.6 6,416.2 4.60 L-80 STL
Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string
Top (ftKB)
25.6
Set Depth
5,519.4
Set Depth
4,534.2
String Max No
4 1/2
Tubing Description
Tubing Completion Upper
Wt (lb/ft)
12.60
Grade
L-80
Top Connection
IBTM
ID (in)
3.96
Completion Details: excludes tubing, pup, space out, thread, RKB...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal
ID (in)
25.6 25.6 0.00 HANGER 7.063 Tubing Hanger, Cameron, CXS, 7-
1/16" x 4-1/2" VAM FJL Top x IBT
Bottom, 4" H BPVG
Camero
n
CXS 3.900
2,659.5 2,492.9 43.80 GAS LIFT 5.200 GLM, 4 1/2" x 1" KBG-2 12.6# IBTM
Box x Pin Ser# 13175-04
Camco KBG-2 3.860
4,091.1 3,493.5 45.83 GAS LIFT 5.984 GLM, 4 1/2" x 1" KBG-2 12.6# IBTM
Box x Pin Ser# 13175-34
Camco KBG-2 3.860
4,937.4 4,100.2 42.92 GAS LIFT 5.984 GLM, 4 1/2" x 1" KBG-2 12.6# IBTM
Box x Pin Ser#13175-22
Camco KBG-2 3.860
5,433.3 4,468.9 40.90 GAS LIFT 5.984 GLM, 4 1/2" x 1" KBG-2 12.6# IBTM
Box x Pin Ser# 13175-32
Camco KBG-2 3.860
5,483.9 4,507.2 40.60 LOCATOR 4.500 Locater Sub, Baker, GHB-22
(bottom of locator spaced out 3.41')
Baker GBH-22 3.960
5,485.6 4,508.5 40.59 SEAL ASSY 4.500 Seal Assembly, Baker, 190-47 Baker 190-47 3.870
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ftKB)
Top (TVD)
(ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in)
4,946.0 4,106.5 42.91 PACKER -
PATCH - UPR
4-1/2" UPR P2P MID-
ELEMENT AT 4949' RKB
WITH SPACER PIPE AND
ANCHOR LATCH, OAL 21'
TTS P2P CPP4
5005 /
CPAL
45007
7/23/2024 2.000
4,950.7 4,109.9 42.90 SPACER
PIPE
2-3/8" SPACER PIPE 7/23/2024 1.995
4,960.0 4,116.7 42.89 LEAK -
TUBING
TUBING LEAK IDENTIFIED
ON RELAY LDL
7/12/2024 3.960
4,967.0 4,121.8 42.88 PACKER -
PATCH - LWR
4-1/2" LWR PKR MID-
ELEMENT AT 4970' RKB,
OAL 4.89'
TTS P2P CPP4
5006
7/22/2023 2.000
7,894.0 6,356.5 43.14 LINER TOP AL1 Liner: Consisting of a
shorty deployment sleeve
( 2.62" OD, 1.90" ID & .84'
OAL) and 1.992" ID slotted
liner.
6/10/2018 1.900
7,903.0 6,363.1 43.24 WHIPSTOCK 3.5" x 4.5" Whipstock 6/2/2018 1.000
9,150.0 6,417.2 84.94 IBP RIBP (BOT) 6/6/2018 0.000
Mandrel Inserts : excludes pulled inserts
Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°)
St
ati
on
No
/S Serv
Valve
Type
Latch
Type
OD
(in)
TRO Run
(psi) Run Date Com Make Model
Port
Size (in)
2,659.5 2,492.9 43.80 1 GAS LIFT GLV BK 1 1,266.0 11/25/2020 Schlumb
erger
Camco
BK 0.188
4,091.1 3,493.5 45.83 2 GAS LIFT OV BK 1 0.0 7/22/2024 Schlumb
erger
Camco
BK 0.250
4,937.4 4,100.2 42.92 3 GAS LIFT DMY BK 1 0.0 11/24/2020 0.000
5,433.3 4,468.9 40.90 4 GAS LIFT DMY BK 1 0.0 5/3/2018 Schlumb
erger
Camco
BK 0.000
Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal ID
(in)
8,590.0 6,415.5 88.75 ALUMINUM
BILLET
2.630 Aluminum billet w/ OH anchors BOT Billet 1.920
1G-07A, 8/9/2024 9:25:21 AM
Vertical schematic (actual)
LINER TOP; 7,894.0
IBP; 9,150.0
A LATERAL; 8,590.0-9,138.6
Shoe; 9,138.2-9,138.6
PRODUCTION; 28.0-8,836.1
FLOAT SHOE; 8,834.2-8,836.1
FLOAT COLLAR; 8,745.6-
8,747.7
ALUMINUM BILLET; 8,590.0-
8,601.2
FISH; 8,357.0
IPERF; 8,253.0-8,273.0
IPERF; 8,217.0-8,238.0
SOS; 8,096.2
NIPPLE; 8,084.5
NIPPLE REDUCER; 8,084.4
SBE; 8,069.4
PACKER; 8,066.0
LOCATOR; 8,064.7
SEAL ASSY; 8,063.8
NIPPLE; 8,039.9
PRODUCTION; 8,030.7
CIBP; 8,020.0
SCAB LINER; 5,477.8-8,002.5
FLOAT SHOE; 8,000.9-8,002.5
APERF; 7,978.0-8,013.0
Liner - Pup; 7,949.9-7,970.0
Landing Collar; 7,949.0-7,949.9
APERF; 7,894.0-7,946.0
WHIPSTOCK; 7,903.0
AL1 LATERAL; 7,894.3-10,608.0
DEPLOYMENT SLEEVE;
7,894.3-7,895.1
Liner Cement; 6,550.0 ftKB
Liner - Pup; 5,540.0-5,549.8
NIPPLE; 5,538.4-5,540.0
Liner - Pup; 5,524.8-5,538.4
XO Reducing (Casing); 5,523.4-
5,524.8
SBE; 5,503.7-5,523.4
SEAL ASSY; 5,485.6
HANGER; 5,494.4-5,503.7
PACKER; 5,477.8-5,494.4
LOCATOR; 5,483.9
GAS LIFT; 5,433.3
PACKER - PATCH - LWR;
4,967.0
LEAK - TUBING; 4,960.0
SPACER PIPE; 4,950.7
PACKER - PATCH - UPR;
4,946.0
GAS LIFT; 4,937.4
GAS LIFT; 4,091.1
GAS LIFT; 2,659.5
SURFACE; 29.7-2,487.0
FLOAT SHOE; 2,485.2-2,487.0
CONDUCTOR; 30.0-79.0
HANGER; 29.7-34.0
HANGER; 28.0-33.0
HANGER; 25.6
KUP PROD
KB-Grd (ft)
29.99
RR Date
1/14/1983
Other Elev
1G-07A
...
TD
Act Btm (ftKB)
9,811.0
Well Attributes
Field Name
KUPARUK RIVER UNIT
Wellbore API/UWI
500292087201
Wellbore Status
PROD
Max Angle & MD
Incl (°)
96.50
MD (ftKB)
8,140.03
WELLNAME WELLBORE1G-07A
Annotation
Last WO:
End DateH2S (ppm)
50
Date
8/22/2017
Comment
SSSV: NONE
Notes: General & Safety
Annotation End Date Last Mod By
NOTE: jennalt
Casing Strings
Csg Des OD (in) ID (in) Top (ftKB)
Set Depth
(ftKB)
Set Depth
(TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread
AL1 LATERAL 2 3/8 1.99 7,894.3 10,608.0 6,428.0 4.60 L-80 STL
Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal ID
(in)
7,894.3 6,356.7 43.14 DEPLOYMENT
SLEEVE
2.375 Shorty Deployment Sleeve Baker 1.000
9,654.1 6,422.6 88.20 DEPLOYMENT
SLEEVE
2.375 Shorty Deployment Sleeve Baker 1.000
1G-07AL1, 8/9/2024 9:25:21 AM
Vertical schematic (actual)
AL1 LATERAL; 7,894.3-10,608.0
SHOE; 10,607.6-10,608.0
DEPLOYMENT SLEEVE;
9,654.1-9,655.0
SHOE; 9,653.7-9,654.1
PRODUCTION; 28.0-8,836.1
SCAB LINER; 5,477.8-8,002.5
LINER TOP; 7,894.0
APERF; 7,894.0-7,946.0
DEPLOYMENT SLEEVE;
7,894.3-7,895.1
Liner Cement; 6,550.0 ftKB
Liner - Pup; 5,540.0-5,549.8
NIPPLE; 5,538.4-5,540.0
Liner - Pup; 5,524.8-5,538.4
XO Reducing (Casing); 5,523.4-
5,524.8
SBE; 5,503.7-5,523.4
SEAL ASSY; 5,485.6
HANGER; 5,494.4-5,503.7
PACKER; 5,477.8-5,494.4
LOCATOR; 5,483.9
GAS LIFT; 5,433.3
PACKER - PATCH - LWR;
4,967.0
LEAK - TUBING; 4,960.0
SPACER PIPE; 4,950.7
PACKER - PATCH - UPR;
4,946.0
GAS LIFT; 4,937.4
GAS LIFT; 4,091.1
GAS LIFT; 2,659.5
SURFACE; 29.7-2,487.0
FLOAT SHOE; 2,485.2-2,487.0
CONDUCTOR; 30.0-79.0
HANGER; 29.7-34.0
HANGER; 28.0-33.0
HANGER; 25.6
KUP PROD
KB-Grd (ft)
29.99
RR Date
1/14/1983
Other Elev
1G-07AL1
...
TD
Act Btm (ftKB)
10,608.0
Well Attributes
Field Name
KUPARUK RIVER UNIT
Wellbore API/UWI
500292087260
Wellbore Status
PROD
Max Angle & MD
Incl (°)
96.50
MD (ftKB)
8,140.03
WELLNAME WELLBORE1G-07A
Annotation End DateH2S (ppm)
50
Date
8/22/2017
Comment
Originated: Delivered to:13-Aug-24
Halliburton Alaska Oil and Gas Conservation Comm.
Wireline & Perforating Attn.: Natural Resource Technician
Attn: Fanny Haroun 333 West 7th Avenue, Suite 100
6900 Arctic Blvd. Anchorage, Alaska 99501
Anchorage, Alaska 99518
Office: 907-275-2605
FRS_ANC@halliburton.com
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of the sender above
WELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPE DATA TYPE LOGGING DATE PRINTS # DIGITAL # E SET#
1 1A-26 50-029-22115-00 909422974 Kuparuk River Leak Detect Log Field- Final 18-Jul-24 0 1
2 1A-26 50-029-22115-00 909422974 Kuparuk River Multi Finger Caliper Field & Processed 18-Jul-24 0 1
3 1D-12 50-029-22948-00 909422973 Kuparuk River Leak Detect Log Field- Final 15-Jul-24 0 1
4 1D-12 50-029-22948-00 909422973 Kuparuk River Multi Finger Caliper Field & Processed 15-Jul-24 0 1
5 1D-101 50-029-22988-00 909422480 Kuparuk River Patch Setting Record Field- Final 9-Jul-24 0 1
6 1F-03A 50-029-20853-01 909423152 Kuparuk River Packer Setting Record Field- Final 20-Jul-24 0 1
7 1G-01 50-029-20805-00 909469740 Kuparuk River Multi Finger Caliper Field & Processed 31-Jul-24 0 1
8 1G-01 50-029-20805-00 909469740 Kuparuk River Packer Setting Record Field- Final 30-Jul-24 0 1
9 1G-07A 50-029-20872-01 909383029 Kuparuk River Leak Detect Log Field- Final 2-Jul-24 0 1
10 1G-07A 50-029-20872-01 909383029 Kuparuk River Multi Finger Caliper Field & Processed 11-Jul-24 0 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518
FRS_ANC@halliburton.com
Date:Signed:
Transmittal Date:
T39431
T39431
T39432
T39432
T39433
T39434
T39435
T39435
T39436
T39436
190-166
199-084
200-183
196-096
182-130
218-051
8-14-2024
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2024.08.14 08:29:49 -08'00'
9 1G-07A 50-029-20872-01 909383029 Kuparuk River Leak Detect Log Field- Final 2-Jul-24 0 1
10 1G-07A 50-029-20872-01 909383029 Kuparuk River Multi Finger Caliper Field & Processed 11-Jul-24 0 1
218-051
Originated: Delivered to:13-Aug-24
Halliburton Alaska Oil and Gas Conservation Comm.
Wireline & Perforating Attn.: Natural Resource Technician
Attn: Fanny Haroun 333 West 7th Avenue, Suite 100
6900 Arctic Blvd.Anchorage, Alaska 99501
Anchorage, Alaska 99518
Office: 907-275-2605
FRS_ANC@halliburton.com
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of the sender above
WELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPE DATA TYPE LOGGING DATE PRINTS # DIGITAL # E SET#
1 1G-07A 50-029-20872-01 909383029 Kuparuk River Packer Setting Record Field- Final 22-Jul-24 0 1
2 1G-11B 50-029-21008-02 909469734 Kuparuk River
Correlation Record ans SBHP
Records Field- Final 29-Jul-24 0 1
3 1G-11B 50-029-21008-02 909469734 Kuparuk River SBHP Record Field- Final 29-Jul-24 0 1
4 1G-17 50-029-22945-00 909422685 Kuparuk River Leak Detect Log Field- Final 13-Jul-24 0 1
5 1G-17 50-029-22945-00 909422685 Kuparuk River Multi Finger Caliper Field & Processed 14-Jul-24 0 1
6 1G-17 50-029-22945-00 909422685 Kuparuk River Packer Setting Record Field- Final 13-Jul-24 0 1
7 1L-24 50-029-22170-00: 909422478 Kuparuk River Patch Setting Record Field- Final 6-Jul-24 0 1
8 1Q-04 50-029-21250-00 909422479 Kuparuk River Leak Detect Log Field- Final 10-Jul-24 0 1
9 1Q-04 50-029-21250-00 909422479 Kuparuk River Multi Finger Caliper Field & Processed 10-Jul-24 0 1
10 1Q-09 50-029-21209-00 909422975 Kuparuk River Multi Finger Caliper Field & Processed 19-Jul-24 0 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518
FRS_ANC@halliburton.com
Date:Signed:
Transmittal Date:
218-051
216-009
199-062
191-066
184-234
184-192
T39436
T39437
T39437
T39438
T39438
T39438
T39439
T39440
T39440
T39441
8-14-2024
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2024.08.14 08:36:38 -08'00'
1 1G-07A 50-029-20872-01 909383029 Kuparuk River Packer Setting Record Field- Final 22-Jul-24 0 1
218-051