Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
199-040
1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 15240'feet 11058',feet true vertical 5969' feet 12137', 12149' feet Effective Depth measured 11508'feet 12011'feet true vertical 5324' feet 5754' feet Perforation depth Measured depth True Vertical depth Tubing (size, grade, measured and true vertical depth) 3-1/2" L-80 12037' MD 5765' TVD Packers and SSSV (type, measured and true vertical depth) 12011' MD 1994' MD 5754' TVD 1829' TVD 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: Kuparuk River Oil Pool- SUSPENDED 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title:Contact Phone: 4751' 3011' Burst Collapse Production Liner 12356' Casing 5849'12391' 4710' 121'Conductor Surface Intermediate 16" 12" 80' measured TVD 7" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 199-040 50-103-20203-01-00 P.O. Box 100360 Anchorage, AK 99510 3. Address: ConocoPhillips Alaska, Inc. N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: ADL0025524 Kuparuk River Field/ Kuparuk River Oil Pool KRU 3H-25A Plugs Junk measured Length measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) ~ Gas-Mcf MD ~ Size 121' ~~~ SUSPENDED ~~ ~ N/A Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG ~ Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. N/A Packer: Baker FHL Rtvbl Packer SSSV: Camco TRDP-4E SFTY VLV Dusty Freeborn Dusty.Freeborn@conocophillips.com 907-659-7224Staff Well Integrity Engineer 12136-12166' 5939-5960' Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Grace Christianson at 10:32 am, Sep 26, 2025 Digitally signed by Dusty Freeborn DN: CN=Dusty Freeborn, O=ConocoPhillips Alaska, OU =Well Integrity and Intervention, E=Dusty.Freeborn@ conocophillips.com, C=US Reason: I am the author of this document Location: Anchorage, Alaska Date: 2025.09.24 11:19:40-08'00' Foxit PDF Editor Version: 13.1.6 Dusty Freeborn J.Lau 11/5/25 RBDMS JSB 100225 P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 September 9, 2025 Commissioner Jessie Chmielowski Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Re: Suspended Well Inspection 10-404 Sundry Kuparuk River Unit 3H-25A (PTD 199-040) Dear Commissioner Chmielowski: Enclosed please find the quinquennial suspended well inspection documentation as required by 20 AAC 25.110 for ConocoPhillips Alaska, Inc. Kuparuk River Unit well 3H-25A (PTD 199-040). The following documents are attached: - 10-404 Sundry - Suspended Well Check List - Wellbore Schematic - Location Plot Plan - Photographs This well is being held for future sidetrack development. Please call me at (907) 265-6218 if you have any questions. Sincerely, Dusty Freeborn Well Integrity Engineer ConocoPhillips Alaska, Inc. Digitally signed by Dusty Freeborn DN: CN=Dusty Freeborn, O=ConocoPhillips Alaska, OU=Well Integrity and Intervention, E= Dusty.Freeborn@conocophillips.com, C=US Reason: I am the author of this document Location: Anchorage, Alaska Date: 2025.09.24 11:20:28-08'00' Foxit PDF Editor Version: 13.1.6 Dusty Freeborn Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By Last Tag:3H-25A osborl Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason: WELL REVIEW 3H-25A 3/5/2012 osborl Notes: General & Safety Annotation End Date Last Mod By NOTE: SIDETRACK FAILED, WELL P&A'd - NO TUBING DETAIL AVAILABLE 6/23/1999 osborl Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread CONDUCTOR 16 15.06 41.0 121.0 121.0 62.50 H-40 WELDED SURFACE 9 5/8 8.53 41.0 4,750.7 2,991.4 47.00 L-80 BTC PRODUCTION 7 6.28 34.9 12,391.3 5,829.7 26.00 L-80 BTC-MOD Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in) 1,944.0 1,829.0 36.14 SAFETY VLV Camco 'TRDP-4E' 5/17/1994 2.812 4,433.0 2,875.1 68.69 GAS LIFT CAMCO/KBUG/1/DMY/BK/// Comment: 1 5/1/1999 2.920 9,166.0 4,600.2 67.31 GAS LIFT CAMCO/KBUG/1/DMY/BK/// Comment: 2 5/1/1999 2.920 11,053.0 5,309.5 66.75 GAS LIFT CAMCO/KBUG/1/DMY/BK/// Comment: 3 5/1/1999 2.920 11,058.0 5,311.5 66.61 CMT PLUG Cement plug after sidetrack failure; Plug & Abandon 7/99 7/1/1999 0.000 11,136.0 5,343.6 64.87 CMT Retainer CEMENT RETAINER 7/1/1999 1.000 11,581.0 5,551.5 62.14 GAS LIFT CAMCO/KBUG/1/DMY/BK/// Comment: 4 6/21/1997 2.920 11,947.0 5,724.3 62.19 GAS LIFT CAMCO/MMM/1.5/DMY/RK/// Comment: 5 5/2/1999 2.920 11,997.0 5,747.2 63.27 PBR Baker '80-40' w/ 10' 5/17/1994 3.000 12,011.0 5,753.5 63.83 PACKER Baker 'FHL' Retr. 5/17/1994 3.000 12,026.0 5,760.0 65.14 NIPPLE Camco 'D' Nipple NO GO 5/17/1994 2.750 12,036.0 5,764.1 66.02 SOS Baker 5/17/1994 2.992 12,137.0 5,797.9 75.02 FISH TAGGED FISH TAGGED FISH @ 12137' - Flat Bottom Mill 1.1' Length X 2.7", w/ 2" Fishing Neck; See WSR's from 4/19/97 to 6/1/97 5/31/1997 12,149.0 5,800.9 76.14 FISH 1" GLV Downhole 8/19/1994 Cement Squeezes Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Des Com Pump Start Date 11,058.0 12,037.0 5,311.5 5,764.5 CMT PLUG 11,058.0 12,391.0 5,311.5 5,829.7 CMT PLUG 3H-25A, 9/9/2025 4:16:19 PM Vertical schematic (actual) PRODUCTION; 34.9-12,391.3 IPERF; 12,136.0-12,166.0 FISH; 12,149.0 FISH; 12,137.0 SOS; 12,036.0 NIPPLE; 12,026.0 PACKER; 12,011.0 PBR; 11,997.0 GAS LIFT; 11,947.0 CMT PLUG; 11,058.0 Primary – Full Bore; 11,050.0 ftKB GAS LIFT; 11,581.0 CMT Retainer; 11,136.0 CMT PLUG; 11,058.0 ftKB CMT PLUG; 11,058.0 ftKB GAS LIFT; 11,053.0 GAS LIFT; 9,166.0 SURFACE; 41.0-4,750.7 GAS LIFT; 4,433.0 Squeeze – Behind Casing Squeeze; 1,684.0 ftKB Primary – Full Bore; 896.0 ftKB SAFETY VLV; 1,944.0 CONDUCTOR; 41.0-121.0 Grouting / Top-Up; 41.0 ftKB KUP PROD KB-Grd (ft) 40.99 RR Date 2/27/1994 Other Elev… 3H-25A ... TD Act Btm (ftKB) 15,240.0 Well Attributes Field Name KUPARUK RIVER UNIT Wellbore API/UWI 501032020301 Wellbore Status PROD Max Angle & MD Incl (°) 96.62 MD (ftKB) 15,163.39 WELLNAME WELLBORE3H-25A Annotation Last WO: End DateH2S (ppm) DateComment SSSV: NIPPLE “Copyright 2025. All rights reserved. This photograph is provided to the AOGCC with permission to copy for its own use. Copying for any other purpose or by any other party is prohibited without the express consent of ConocoPhillips Alaska, Inc.” “Copyright 2025. All rights reserved. This photograph is provided to the AOGCC with permission to copy for its own use. Copying for any other purpose or by any other party is prohibited without the express consent of ConocoPhillips Alaska, Inc.” “Copyright 2025. All rights reserved. This photograph is provided to the AOGCC with permission to copy for its own use. Copying for any other purpose or by any other party is prohibited without the express consent of ConocoPhillips Alaska, Inc.” “Copyright 2025. All rights reserved. This photograph is provided to the AOGCC with permission to copy for its own use. Copying for any other purpose or by any other party is prohibited without the express consent of ConocoPhillips Alaska, Inc.” “Copyright 2025. All rights reserved. This photograph is provided to the AOGCC with permission to copy for its own use. Copying for any other purpose or by any other party is prohibited without the express consent of ConocoPhillips Alaska, Inc.” “Copyright 2025. All rights reserved. This photograph is provided to the AOGCC with permission to copy for its own use. Copying for any other purpose or by any other party is prohibited without the express consent of ConocoPhillips Alaska, Inc.” Suspended Well Inspection Review Report Reviewed By: P.I. Suprv Comm ________ JBR 10/29/2025 InspectNo:susSTS250908142006 Well Pressures (psi): Date Inspected:9/6/2025 Inspector:Sully Sullivan If Verified, How?Other (specify in comments) Suspension Date:6/29/1999 Tubing:1 IA:1 OA:188 Operator:ConocoPhillips Alaska, Inc. Operator Rep:Matt Miller Date AOGCC Notified:9/3/2025 Type of Inspection:Subsequent Well Name:KUPARUK RIV UNIT 3H-25A Permit Number:1990400 Wellhead Condition no signs of leaks, well head is outside and shows normal wear from weather. Valves turn easily and tree is isolated from flowline Surrounding Surface Condition clean, no subsidence Condition of Cellar no cellar, gravel to surface Comments Gauges were accurate and verified by calibrated digital gauge. Location was verified by plot map. Supervisor Comments Photos (2) attached Suspension Approval:Completion Report Location Verified? Offshore? Fluid in Cellar? Wellbore Diagram Avail? Photos Taken? VR Plug(s) Installed? BPV Installed? Wednesday, October 29, 2025 2025-0906_Suspend_KRU_3H-25A_photos_ss Page 1 of 1 Suspended Well Inspection – KRU 3H-25A PTD 199400 AOGCC Inspection Rpt # susSTS250908142006 Photos by AOGCC Inspector S. Sullivan 9/6/2025 1.Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ___________________ 2. Operator Name:4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3.Address:Stratigraphic Service 6.API Number: 7.If perforating:8.W ell Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception?Yes No 9.Property Designation (Lease Number):10.Field/Pool(s): 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD): Casing Collapse Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13.W ell Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14.Estimated Date for 15.W ell Status after proposed work: Commencing Operations:OIL WINJ WDSPL Suspended 16. Verbal Approval:Date:GAS WAG GSTOR SPLUG Commission Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Date: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Post Initial Injection MIT Req'd? Yes No Spacing Exception Required? Yes No Subsequent Form Required: APPROVED BY Approved by:COMMISSIONER THE COMMISSION Date: Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Authorized Title: 17.I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Signature: Perforation Depth MD (ft): TVD BurstMDLength Size Perforation Depth TVD (ft): Tubing Size: PRESENT WELL CONDITION SUMMARY STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 COMMISSION USE ONLY Authorized Name: Tubing Grade: Tubing MD (ft): approval: Notify Commission so that a representative may witness Sundry Number: BOP TestMechanical Integrity Test Location Clearanc e ection MIT Req'd? Yes No ption Required? Yes No Subsequent Form Required: COMMISSION USE ONLY Contact Name: Contact Email: Contact Phone: Date: e: certify that the foregoing is true and the procedure approved herein will not rom without prior written approval. gnature: me: Date for 15.W ell Status after proposed work: Operations:OILWINJ W DSPL Suspended proval:Date:GASWAGGSTOR SPLUG Representative:GINJ Op Shutdown Abandoned nts: Proposal Summary Wellbore schematic13.W ell Class after proposed work: ations Program BOP SketchExploratory Stratigraphic Development Service SSSV Type:Packers and SSSV MD (ft) and TVD (ft): quest: Abandon Plug Perforations Fracture Stimulate Repair We Operations shutdownpair Well Suspend Perforate Other Stimulate Pull Tub Change Approved Programll Tubing Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ___er Casing ________________ __ ame:4.Current Well Class:5.Permit to Drill Number: Exploratory Development Stratigraphic Service 6.API Number: g:8.W ell Name and Number: ation or Conservation Order governs well spacing in this pool? perforations require a spacing exception?Yes No esignation (Lease Number):10.Field/Pool(s): D (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD): g Collapse pth MD (ft): TVD BurstMDLengthSize Perforation Depth TVD (ft):Tubing Size: PRESENT WELL CONDITION SUMMARY Tubing Grade:Tubing MD (ft): Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval. ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510 199-040 50-103-20203-00 n/a KRU 3H-25A ADL 25524 Kuparuk River Field/Kuparuk River Oil Pool 15240 5969 11058 5324 cement 11058 12137, 12149 Conductor 80 16" 121 121 Surface 4710 12" 4751 3011 Production 12356 7" 12391 5849 12136-12166 (cemented)5797-5805 (cemented) 3-1/2"L-80 12037 Baker FHL Packer 12011' MD, 5754' TVD 06/29/1999 Stephanie Pilch Well Integrity & Compliance Specialist Digitally signed by Stephanie Pilch DN: C=US, O=CPAI, CN=Stephanie Pilch, E=stephanie.r.pilch@conocophillips.com Reason: I am the author of this document Location: your signing location here Date: 2020-10-10 10:10:37 Foxit PhantomPDF Version: 10.0.0 Stephanie Pilch 10/10/20 Stephanie Pilch/Sara Carlisle n2549@conocophillips.com (907)659-7126 ✔Suspension Renewal ✔ ✔ ✔ ✔✔ ✔ By Samantha Carlisle at 6:09 pm, Oct 11, 2020 320-433 DSR-10/12/2020 NONE DLB 10/12/2020 X 0025531; ADL0025532 DLB X VTL 11/2/20 -01-00 DLB Com m. 11/3/2020 dts 11/3/2020 JLC 11/3/2020 RBDMS HEW 11/12/2020 !"##$ %& %' ( )* "(%+,)$-./0 ##) * 1 0 & .(23- .2145'' ('"(%+,)$-./0 ##) * 1( $3 3 /4(64 7 )* *3 /' )* '3 .'!& )/(''!(!3 )/(3 .25'(!'' 4(3 . 7$#) 7'4453 4 (. 2!48 ( ( .(23 Digitally signed by Stephanie Pilch DN: C=US, O=CPAI, CN=Stephanie Pilch, E=stephanie.r.pilch@conocophillips.com Reason: I am the author of this document Location: your signing location here Date: 2020-10-10 10:10:58 Foxit PhantomPDF Version: 10.0.0 Stephanie Pilch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y Samantha Carlisle at 9:34 am, Jun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uspended Well Inspection Review Report InspectNo: susBDB200517134344 Date Inspected: 5/16/2020 Inspector: Brian Bixby Well Name: KUPARUK RIV UNIT 3H -25A Permit Number: 1990400 Suspension Approval: Completion Report Suspension Date: 6/29/1999 Location Verified? Q If V f' ei ried, How? Other (specify in comments) ' Offshore? ❑ Type of Inspection: icy qq7" Subsequent Date AOGCC Notified: 4/27/2020 Operator: ConocoPhillips Alaska, Inc. Operator Rep: Roger Winter Wellbore Diagram Avail? Photos Taken? Well Pressures (psi): Tubing: 0 Fluid in Cellar? ❑ IA. 0 BPV Installed? ❑ OA. 10 VR Plugs) Installed? ❑ Wellhead Condition The wellhead looked to be in good condition and all the valves worked properly and had gauges on them. Condition of Cellar Full of gravel Surrounding Surface Condition No wellhouse. The surrounding area (between wellhouses) looked to be in good order, snow and ice had been removed to expose gravel. No signs of any leaks or trash. Comments Location verified by as -built pad map. , Supervisor Comments Location should be clear of snow and ice before suspended well inspection is performed. Photo (1) Friday, June 5, 2020 Suspended Well Inspection - KRU 311-25A PTD 1990400 Photos by AOGCC Inspector B. Bixby 5/16/2020 2020-0516Suspend_KRU 3H-25A_bb.docx I Page 1 of STATE OF ALASKA AL .__KA OIL AND GAS CONSERVATION CON._ _.iSION REPORT OF SUNDRY WELL OPERATIONS 1 Operations Abandon r Plug Perforations r Fracture Stimulate r Pull Tubing r Operations shutdown r Performed Suspend r Perforate r Other Stimulate r Alter Casing r Change Approved Program r Rug for Redrill r Perforate New Pool r Repair Well r Re-enter Susp Well r Other:Suspend Well Inspect F. 2.Operator Name 4.Well Class Before Work. 5.Permit to Drill Number: ConocoPhillips_ Alaska, Inc Development Exploratory r 199-040 - 3.Address: 6.API Number: Stratigraphic r Service r P. O. Box 100360,Anchorage,Alaska 99510 50-103-20203-01 7.Property Designation(Lease Number) 8.Well Name and Number: ADL 25524 KRU 3H-25A 9 Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): NA Kuparuk River Field/Kuparuk River Oil Pool 11 Present Well Condition Summary: Total Depth measured 15240 feet Plugs(measured) Cement Plug 11058 true vertical 5969 feet Junk(measured) Fish - 12137 & 12149 Effective Depth measured 11058 feet Packer(measured) 12011 true vertical 5324 feet (true vertical) 5754 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 16 121 121 1640 630 SURFACE 4710 12 4751 3011 6870 4760 PRODUCTION 12356 7 12391 5849 7240 5410 Perforation depth: Measured depth: 12136-12166 ( ,� 2015 n i✓ R E D E V E D True Vertical Depth: 5797-5805 SCANNED iI-I JUN 3 0 2015 Tubing(size,grade,MD,and TVD) 3.5, L-80, 12037 MD, 5765 TVD AOGCC Packers&SSSV(type,MD,and TVD) PACKER-BAKER'FHL' RETR. @ 12011 MD and 5754 TVD AO 12 Stimulation or cement squeeze summary: NA Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13 Representative Daily Average Production or Injection Data 011-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure , Prior to well operation NA NA NA NA NA Subsequent to operation NA NA NA NA NA 14.Attachments(required per 20 AAC 25.070,25 071,&25 283) 15.Well Class after work: Daily Report of Well Operations p Exploratory r Development r Service r Stratigraphic r Copies of Logs and Surveys Run r 16.Well Status after work: Oil r Gas r VVDSPL r Printed and Electronic Fracture Stimulation Data r GSTOR r VVINJ r WAG r GINJ r SUSP p- SPLUG r 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C 0 Exempt NA Contact MJ Loveland/Martin Walters Email N1878conocophillips.com Printed Name MJ Loveland Title WI Project Supervisor Signature - // (///1/ / Phone:659-7043 Date �,/j�` ori- 7-lg115- RBDM JUL - 1 2015 Form 10-404 Revised 5/2015 Submit Original Only ConocoPhillips RECEIVED Alaska JUN 3 0 2015 P.O. BOX 100360 ANCHORAGE,ALASKA 99510-0360 AOGCC June 29, 2015 Commissioner Cathy Foerster Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Re: Suspended Well Inspection 10-404 Sundry Kuparuk River Unit 3H-25A (PTD 199-040) Dear Commissioner Foerster: Enclosed please find the quinquennial suspended well inspection documentation as required by 20 AAC 25.110 for ConocoPhillips Alaska, Inc. Kuparuk River Unit well 3H-25A (PTD 199-040). The following documents are attached: - 10-404 Sundry - Suspended Well Check List - Wellbore Schematic - Location Plot Plan - Photographs This well is being held for future sidetrack development. Please call Martin Walters or me at 659-7043 if you have any questions. Sincerely, MJ Loveland ConocoPhillips Well Integrity Projects Supervisor Suspended Well Site Inspection Form Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness Well Name: KUPARUK RIV UNIT 3H-25A Field/Pool: KUPARUK RIVER Permit#(PTD): 199-040 Sundry 310-422 API Number: 50-103-20203-01-00 Operator: ConocoPhillips Alaska, Inc. Date Suspended: 6/29/1999 Surface Location: 1220' FNL, 281' FWL Section: 12 Township: 12N Range: 8E Nearest active pad or road. KRU DS3H Meridian: UMIAT Take to Location Digital camera Map showing well location /Aerial photos Brief well history Wellbore diagram showing downhole condition Latest Sundry or Completion report Past Site Visit documentation Site clearance documentation Pressure gauges, fittings, tools Sample containers for fluids on or near pad Condition of Surface Location AOGCC requires: 1) a description of the condition of the surface location, including discoloration, fluids or sheens visible on the ground or in any nearby water, 2) photographs showing the condition of the location surrounding the well General location condition: No well house, water in conductor Pad or location surface: Good Location cleanup needed: no Pits condition: Reclamed Surrounding area condition: Clean Gravel Water/fluids on pad: NA Discoloration, Sheens on pad, pits or water: NA Samples taken: NA Access road condition: Good Photographs taken (#and description): 3 of well and surrounding area Condition of Wellhead AOGCC requires: 1) a description of the condition of the wellhead, 2)well pressure readings, where practicable, 3) photographs showing the wellhead condition Wellhead/tree/valve description, condition: Cean Cellar description, condition, fluids: Back-filled Rat Hole: NA Wellhouse or protective barriers: NA Well identification sign: Well Head Stencil, no other signage Tubing Pressure (or casing if no tubing): 0 psi Annulus pressures: IA= 0 psi, OA= 0 psi Wellhead Photos taken (#and description): Work Required: sign Operator Rep (name and signature): Roger Mouser AOGCC Inspector: Johnnie Hill Other Observers: Amy Conklin Inspection Date: 6/27/2015 AOGCC Notice Date: 6/25/2015 Time of arrival: 1100 Time of Departure: 1115 Site access method: Truck i KUP 3H-25A v ConocoPhillips 04 Well Attributes Max Angle&MD TD AlaskaInc. Wellbore API/UWI Field Name Well Status Incl(°) I MD(RKB) Act Btm(RKB) CanmPtul6ps 501032020301 KUPARUK RIVER UNIT _ PA 96.62 15,163.39 15,240.0 CommentH2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date --- SSSV:NIPPLE Last WO: 40.99 2/27/1994 -- Well Conf.:-3H-25A,3/5/2012 2:11:40PM Schematic-Actual - Last Tag: Rev Reason:WELL REVIEW osborl 1 Casing Strings Casing p Thrd CONDUCTOR r 1. 1 1 1 1 String 1 •WELDED I Casing Description String 0... String ID...Top(RKB) Set Depth(f...Set Depth(ND)...String Wt...String...String Top Thrd SURFACE 95/8 8.535 41.0 4,750.7 3,010.9 47.00 L-80 BTC Casing Description String 0... String ID...Top(RKB) Set Depth(f...Set Depth ITVD)...String Wt...String...String Top Thrd PRODUCTION 7 6.276 34.9 12,391.3 5,849.0 26.00 L-80 BTC-MOD Tubing Strings Tubing Description String 0... String ID..Top(ftKB) Set Depth(f...Set Depth(TVD).. String Wt...String... String Top Thrd TUBING 31/2 2.992 27.0 12,037.0 5,780.4 9.30 L-80 8rdABMOD CONDUIv CTOR, Other In Hole Wireline retrievable plugs,valves,pumps,fish,etc.) Top Depth (ND) Top mel SAFETY VLV, lTop(MB) (RKB) (•) Description Comment Run Date ID(in) •• 1,944 — IE'. 1,944.0 1,848.4 36.30 SAFETY VLV Camco TRDP-4E' 5/17/1994 2.812 4,433.0 2,894.6 68.66 GAS LIFT CAMCO/KBUG/1/OMY/BW//CommenC 5/1/1999 2.920 I 9,166.0 4,619.7 67.15 GAS LIFT CAMCO/KBUG/1/DMY/BW//CommenC 5/1/1999 2.920 11,053.0 5,329.0 66.74 GAS LIFT CAMCOMBUG/1/DMY/BW//Comment: 5/1/1999 2.920 GAS LIF3 11,058.0 5,331.0 66.32 CMT PLUG Cement plug after sidetrack failure;Plug&Abandon 7/99 7/1/1999 0.000 11,136.0 5,363.1 64.87 CMT Retainer CEMENT RETAINER 7/1/1999 1.000 11,581.0 5,571.1 62.44 GAS LIFT CAMCO/KBUG/1/DMY/BW//Comment: 6/21/1997 2.920 11,947.0 5,743.6 62.19 GAS LIFT CAMCO/MMM/1.5/DMY/RW//Comment: 5/2/1999 2.920 11,997.0 5,766.7 63.27 PBR Baker'80-40'w/10' 5/17/1994 3.000 12,011.0 5,766.2 63.31 PACKER Baker'FHL'Retr. 5/17/1994 3.000 12,026.0 5,774.6 64.71 NIPPLE Camco'D'Nipple NO GO '5/17/1994 2.750 12,036.0 5,779.9 65.64 SOS Baker 5/17/1994 2.992 SURFACE, . ' 12,137.0 5,816.6 75.02 FISH TAGGED FISH TAGGED FISH @ 12137'-Flat Bottom Mill 5/31/1997 41-4.751 1.1'Length X 2.7",w/2"Fishing Neck;See WSR's from i 4/19/97 to 6/1/97 12,149.0 5,818.8 76.14 FISH 1"GLV Downhole 8/19/1994 GAS LIFT. Notes:General&Safety 9,765 End Date Annotation 623/1999 NOTE:SIDETRACK FAILED,WELL P&A'd-NO TUBING DETAIL AVAILABLE GAS11.053 LIFT, i . CMT Retainer, 1,136 j GAS LIFT, 11,581 CMI PLUG, 17,058 GAS11,947 LIFT, PBR.11,997 2t PACKER. ...._:--- 12,011 NIPPLE,12,026 f1 I e SOS.12,038 CMI PLUG, I'• 11,058 FISH,12.137 FISH.12,149 IPERF, 12,136.12,166 CMT PLUG, 11,058 PRODUCTION, • 35-12,391 TD(3H-25A), 15,240 G IP cx s. t •-• o $ I m =p NH 1 + 0 0 1 a 0 < fl NMaOZ I O L". + j Q o - .- u,d Lti UW O tn \._ w w -IJ3 QJQ • o / / VI. I / i --'-1&" O zo co o — • 1.e1$N O 0o m C R -+-I + ,--__, -+-00+91 N 0 I�il.. _ �n� r , x ISI 0 `‘, 1"-.—-s- `-ffi CO = z n N $ N IIN ----+00O181 ao '? ---+ ii I ^'� o 0 -- f - `$ W st 4•El7k .• -+- -+- Cn -+-00+02 N I I CAI 5 a alr �°lbe p I o as �7a.. ,f�N J W Z Z o= �-i-+ —kmscrl ;-44 N I I1 • �v J O WU U, O 1 it I0i _+ ^' II I 1 • / _ _ 4_ mm 0 n -� '181 N Z O _. 1I __ _i81 m m w ma �..I WS ','I is o m o e0 _j_ T � � -00+zz N < r Mm CC I O r-1 N I� < I ' 0 m M.N. II -n 1'La y��a N zz yy 1 NIJ- N 3 U N \\--_—__--� I.n , 6 1-Ii31 NY1 D U N --- -7---------..------..t. N O K and -L U -+- T -j -+-00+1,Z N 1 55 m ' z m x 1 o � } + L } .a • N v •▪ c o CL 6 \C 1 47 A-4 '`.. "�(.u J ' , 1. 4 r t . # , • rt �, -t fit �l Py /) `.F` fr., •q" / t + t is AitF I -1. r•C t i '' r r m r� t„ x � Ye 5.'11 • �p ''' r° r ( ri rt IF,,., -" tib. °. � � ,,:i �i�s. 115 �� � �+ � � '� r �, x • r } :.ms�ss � �' '}f d•. t4 t. � �,' # '/".;' 4'-.;;;' 1,�'� • r .'�+ !! itt ✓..` )r ' ''''1 `y` :. a "t g(} ♦,,73 J-, . 'n wi iw m. p,, :. °,� � .. -,,,,,,,->,,,I. f �. i` #" ,r a;`4,,,,,...,,,,:',,".f s , ,jam*,,ay., ,.r" .. ;• ?* "fig. F "+,z 'r a t t: t 5{ _ f 1 ,:4" fie r .t '/4 t ,� i , �i T., 1 . t.t i' It �, I. 1 ' �) .t. f Y J i. ` nf\ i 71. ' 1 .rl 'fig .r f,'f ' i' t�',� z. Y°. l \ , ' • ;.. i `f'r � �' Q t,f 31 z� � ti'1 t` �A}i�r S � 7• ��y,.•'r�, i `•••••,..:`-• .�".xT t' *r,,• '� / • ri 7 ' ; siN...1.4r.,, to! 'it -. , , --t, , '...- :2' f R o , ,,,,,,,,‘ .... ,3 .amu° °�,5, it it <e a S,,,,,_ �1 3 .,, 1 ` " ,**a' t ra 4., • .. . ... pm t , y y, ,. ;�§ �,, .4 ,.. v < „,, T Li) .. „ , ..., , ., , q Iv .1 ' ' , ' ', ' t ;'.'44",tel: -'.2,,,:f.'k 04%,":t; :',1*,. ??' '0 ' a) CO ' 1 ` c. {`yam.,, .” }y ., ''''Atq 1 4. ` r iii �C�1� }ilk, Yet �� `" Y " , r ti f .0 r�it r �� .a A' i � S it ag y` x, ' ; ,,. , i'•'';.,:4,i 1 ' l;t. I •F ,., , F; 'x ' `:\t r4 k%,,,',4, ''1-lr�., .r11t '*:' ♦ �• . r �� p n .,-.‘v,4-:.:*.- 1 , ,,.i.i a„ c� �. ... , 41R. .z t• K fi �� fid, 1v�, . „s. t .`� 1 4 i �a t y r _ 1{ � x �v t .Z f v ti►-� c ca. , Li, ,g) it 4 � � xa�`. Y�' l� AZ •Itis c , i,c. .-..!..44t,'vf.,,,,iko!t ,,i4. i - . ' ' 4t. �{,��y ,� � !: �s tii `' 4. �11'• ,�k r 1 ry'ttliiks:, :1';.,. ,-.\°4,, 1, �,-� QRZ•<,,.' i* t`Y 4 Vv', i' `p'k 'l,, .,. `1 �,! ,is :' ,.4:;,:,' 4,•., 1 4-,' :I '`t- ,,t 4" &,. ,„•', • ' ''.:: — \' 10" 8 \‘,0 ' , ie.\ c: f N\s„ - ' . -•,',', „ ,. ,..v4-46 41',!',..*.A. ii• ,.!4 1 s.,,,,,,-,, ..r \', : i ,c.-) ..E. a 'k.„,.„ -, . .•.. , , ' ,,,, ', ,.., 7g,..:,,,,,pc.:,,, 4" ,,.' 'VV‘s4 , . :'\''''' ' ','k s>) i• ,C , '- S ,' lY n A O' • �* `.r 4,•.4A i �. ' t 'ti C �C 4 « lk '��`\� �_ (j�t�J. „1",- i 3H-25A PTD '9-040 ©ConocoPhillips Alaska, Inc This photo is copyrighted by ConocoPhillips Alaska, Inc. and cannot be released or published without express written consent of ConocoPhillips Alaska of OA , . «oi lowt , ,, �: IR 0 r 1116 i , ,,,,,iii . lb.. iivik k tinINIIIP 4 . ... ev, , .,„. . . -',, , ..„ ,. . i 4. v yr, 40°y t'a i w N.a W so ee b» v o- r * � ..r ** Y ! .. t_ / . • i':'.:41::.': .:r :..'.,-'');' .4:...!. ,. 4 jilt, . • , .,,,, ...„... ? , ..,. :..: ,, „„,,,,,,i . . 1 . . . ,,,, „:,::,, .,,...., .... . , ... ..... . ___. . ,.. 1 ,.., .. ...„ „,..,,, .., , - r v: 3 . r �` -- , t � _. m ley, � � . . _... . , , .;.. x , i� _ �M m 014, ii lialilliM — X , ► .. Mgr mom.... - - •- .r` . .. F ..gip P"`'• .� d V r b 3H-25A PTD 199-040 . ©ConocoPhillips Alaska, Inc This photo is copyrighted by ConocoPhillips r�. Alaska, Inc. and cannot be released or � . published without express written consent of ConocoPhillips Alaska • i STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Suspended Well Inspection Report Date Inspected: 06/27/15 Inspector: Johnnie Hill , Operator: ConocoPhillips Alaska Inc , Well Name: 3H-25A Oper.Rep: Perry Greenwood PTD No.: 199-040 Oper.Phone: Location Verified? Yes Oper.Email: If Verified, How? LAT/LONG • Onshore/Offshore: Onshore Suspension Date: 06/29/99 Date AOGCC Notified: 06/25/15 Sundry No.: Well Completion Report Type of Inspection: Subsequent Wellbore Diagram Avail.? No Well Pressures(psi): Tubing 0 • Photos Taken? Yes IA 100 • OA 160 • Condition of 3CAIAEL Wellhead: good and clean-no well house water in conducter Condition of Surrounding Surface Location: good clean gravel/celler little water Follow Up Actions Needed: sign needed with well name and Lat and Long - Comments: Attachments: Photos(1) REVIEWED BY:QQ Insp.Supry JYk 74-4(, - Comm PLB 06/2014 2015-0627_Suspend_KRU_3H-25Ajh.xlsx • Suspended Well Inspection - KRU 3H-25A PTD 1990400 Photos by AOGCC Inspector J. Hill 6/27/2015 1111g F 3. 4 II r. z b M 2015-0627_Suspend_KRU 3H-25A_jh.docx Page 1 of 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Suspended Well Inspection Report Date Inspected: 08/29/10 Inspector: Bob Noble Operator: CPA Well Name: KRU 3H-25A Oper.Rep: Ian Ives PTD No.: 199-040 Oper.Phone: 659-7043 Location Verified? Yes Oper.Email: If Verified, How? ier(specify in commei Onshore/Offshore: Onshore Suspension Date: 06/29/99 - Date AOGCC Notified: 08/28/10 - Sundry No.: Well Completion Rpt Type of Inspection: Initial Wellbore Diagram Avail.? Yes Well Pressures(psi): Tubing 0 Photos Taken? Yes IA 0 OA 0 SCANNED AUG 1 4 201` Condition of Wellhead: Wellhead location verified with use of a plot plan.Wellhead looked to be in good working condition.All lines blinded with gauges. Mandrel hanger had lifted out of conductor about 8".There was about 1"of water in conductor on top of sealant. Wellhead is protected by the two wellhouse's on each side. Condition of Surrounding Surface The surface location lookd good and free of any oil. Location: Follow Up Actions AL valve missing handle. I asked Ian to see that the AL valve got a handle installed on it. Needed: Attachments: Photos(3) REVIEWED BY: Insp.Supry Comm PLB 08/2010 2010-0829_Suspend_KRU_3H-25A_bn.xlsx - 4 sg,7 • , , .f.' p6::, ,:',:0111:i , ,:r..1,.-..1:,....,:,,,,,i,,, , , , ,, . , It 1 r ( ft . 1'! 1 �I N 11 i 1 _ " it -� '� : � � .t i , ri; - , t , ,' r t t J a _ ' V t r l,IPy! N en — ‘,„ „ ,. ,, ,( :, ,,,,, , . • .,.. i., . . . . t . , ilin 1, II z. . ..., I , I -CI { 'O ' T, 1,,," rJia ' , i ,: xO , r 7 f... # CU U s U • " . to w -o .,p . ik rCAo 4.71O Ncu 0 ;r r iI EOm . N r.i O c3 r/1a A, o • Ncs. .$11t. • tir 4 " f 1.,.,0 ' �.r, •rr ., " 6:;,/,,,. � '. i t+M ,0 iikr ill * It \I IA ' . Off* r . ....,.. .., ri �� t � el �� 0 p '1,-4-',,,e' ?-71r--\'.4t "n eq f f .4 '_ x .� �. 1 f •114 - o . ,;. :�. v, + -- , r ., i ' C Oki • • 12 E [JJ [F AILASEA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 MJ Loveland Well Integrity Project Supervisor 0 'mil 0 ConocoPhillips Alaska, Inc. (, '" P.O. Box 100360 Anchorage, AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, 3H -25A Sundry Number: 310 -422 Dear Ms. Loveland: StiANNED JAN 2 UY Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 9 Daniel T. Seamount, Jr. Chair DATED this5 day of January, 2011. Encl. • Iv • • ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510 -0360 December 11, 2010 RECEIVED Commissioner Dan Seamount DEC 4 2010 Alaska Oil and Gas Conservation Commission 333 West 7 Avenue, Suite 100 Alaska Oil & Gas Coifs. Commission Anchorage, AK 99501 Anchorage Re: Renewal of Suspended Well 10 -403 Status Kuparuk River Unit 3H -25A (PTD 199 -040) Dear Commissioner Seamount: ConocoPhillips Alaska Inc. (CPAI) hereby submits a request for renewal of the suspension status of Kuparuk River Unit well 3H -25A (PTD 199 -040) per 20 AAC 25.110. The well was visually inspected September 29, 2010 and the results submitted on a 10 -404. The condition of the well is noted on an attached schematic and 10 -403 form. Please note the following: - The perforation from original well bore are isolated with a cement plug. - The well is on an active pad. CPAI request the renewal of the suspension because the well is being held for future rotary side track development. Please call Perry Klein or me at 659 -7043 if you have any questions. Sincerely, MJ Loveland ConocoPhillips Well Integrity Projects Supervisor STATE OF ALASKA � ALAS•IL AND GAS CONSERVATION COMMISS 1'4' t, APPLICATION FOR SUNDRY APPROVALS t' 4. 20 AAC 25.280 1. Type of Request: Abandon r Flug for Redrill r Perforate New Pool r Repair w ell r Change Approved Program r Suspend . Flug Fl?rforations r Perforate r Rill Tubing r Time Extension ' y q Operational Shutdow n r Re -enter Susp. Well r Stimulate r Alter casing r Other: ✓ sw pin Seaver 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConocoPhillips Alaska, Inc. Development r , Exploratory r 199 -040 3. Address: Stratigraphic r Service r 6. API Number! P. 0. Box 100360, Anchorage, Alaska 99510 50- 103 - 20203 -01 , 7. If perforating, closest approach in pool(s) opened by this operation to nearest property line 8. Well Name and Number: where ownership or landownership changes: Spacing Exception Required? Yes r No r 3H -25A 9. Property Designation: 10. Field / Pool(s): ADL 25524 ALK 2655 Kuparuk River Field / Kuparuk River Oil Pool ' 11. PRESENT WELL CONDITION SUMMARY Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 15240 • 5969 • 11058' 5324' 11136' 12037' Casing Length Size MD TVD Burst Collapse CONDUCTOR 121 16 121' 121' SURFACE 4751 9.625 4751' 2991' PRODUCTION 12391 7 12391' 5829' Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 12136 - 12166 - cemented 5939 - 5960 - cemented 3.5 L - 80 12037 Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft) Baker FHL Retr. 12011 MD 5852 TVD Camco TRDP -4E 1944 MD 1833 12. Attachments: Description Summary of Proposal r 13. Well Class after proposed work: Detailed Operations Program r BOP Sketch r Exploratory r Development r Service r 14. Estimated Date for Commencing Operations: 15. Well Status after proposed work: NA 011 r Gas r WDSPL r Suspended r . 16. Verbal Approval: Date: WINJ r GINJ r WAG r Abandoned r Commission Representative: GSTOR r SPLUG r 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: MJ Lovland /Perry Klein Printed Name �% /" Loveland /Perry Klein Title: WELL INTEGRITY SUPERVISOR Signature i ��, "7 7 �' Phone: 659 -7043 Date p_ _// `/ V Commission UOnly Sundry Number: 3f 0 ! 1 Conditions of approval: Notify Commission so that a representative may witness / v Plug Integrity r BOP Test r Mechanical Integrity Test r Location Clearance r Other: RECEIVED 14 2010 lieSICa L .[_ D EC Subsequent Form Required: f i JJl g / 4 Ci Eaas Cons. Commission a ch ore. / / Approved by: APPROVED BY COMMISSIONER THE COMMISSION Date: ) �/ [ C ppefr), 1 "'•3 Form 10 -403 Relief) � ��:+ �qN Og ZO � � R Submit in Df� �� /yXa • • ARCO Alaska, I nc.A GKA 3H -25/ 3H -25 SSSV -- API: 501032020300 Well Type: PROD Angle @ TS: 46 deg Si) 12130 (1944-1945, l SSSV Type_ Camco'TRDP -4E' Orig Completion: 2/27/94 Angle @ TD: 45 deg (it 12410 Annular Fluid: Last W /O: Rev Reason: Sidetrack OD 3 500) - f ailure/P &A by ImO Reference Log: Ref Log Date: Last Update: 7/17/99 Last Tag: 12110 CTM TD: 12410 ftKB Last Tag Date: 8/5/98 Max Hole Angle: 71 deg a 3358 _ Gas Lift - - -- - —t Casing String - CONDUCTOR MandrelNalve 1 f Size Top Bottom TVD Wt Grade 1 Thread 1(4433 - 4434. ' 16.000 0 121 121 62.60 H - 40 00:5.313) Casing String - SURFACE Size Top Bottom TVD Wt Grade Thread 9.625 0 4751 3004 36.00 J - 55 Gas LIR Rr . 1 Casing String - PRODUCTION MandrelNalve L I Size Top Bottom TVD Wt Grade Thread 2(9166 ' 7.000 0 12391 6118 _ 26.00 L - 80 OD 5.313) Tubing String - TUBING Size Top Bottom TVD Wt Grade Thread 3.500 0 12037 _ 5870 9.30 L - 80 8RD A8 MOD Perforations Summary ;1 interval TVD Zone 3tatusFeetSPF Date Type Comment 12136 - 12166 5939 - 5960 C - 4 30 4 5714 /94IPERF 180 deg. phasing; 4 172" HSD Gas Lift MandrelsNalves PLUG - Stn MD TVD Man Man V Mfr V Type V OD Latch Port TRO Date Viv (11058-12391, Mfr Type Run 3ommen 00.6.500) 1 4433 2888 Camco KBUG CAMCO DMY 1.0 BK 0.000 0 5/1/99 2 9166 4612 Camco KBUG CAMCO DMY 1.0 BK 0.000 0 5/1/99 3 11053 5321 Camco KBUG CAMCO DMY 1.0 8K 0.000 0 6/1/99 4 11581 5574 Camco KBUG CAMCO DMY 1.0 BK 0.000 0 6/21/97 5 11947 5808 Camco MMM CAMCO DMY 1.5 _ RK 0.000 0 5/2/99 Other (plugs, equip., etc.) -JEWELRY ji Depth TVD Type Description ID 1944 1833 SSSV Camco 'TROP -4E' 2.812 11997 5843 PBR Baker '80 -40' w/ 10' 3.000 12011 5852 PKR Baker'FHL' Relr. 3.000 12026 6863 NIP Camco '0' Nipple NO GO 2.750 12036 5870 SOS Baker 2.992 PBR 12037 5870 TTL 2.992 (11997.11998. Other plugs, equip., etc.) - PLUG 00.3500) Depth TVD Type Description ID 11058 5323 PLUG Cement plug after sidetrack (allure; Plug & Abandon 7/99 0.000 Fish - FISH Depth Description Comment PKR 12137 TAGGED FISH TAGGED FISH © 12137' - Flat Bottom Mill 1.1' Length X 2.7 ", w/ 2" (12011- 12012, Fishing Neck; See WSR's from 4/19/97 to 8/1/97 00.6 151) 12149 1" GLV _Downhole General Notes Date Note 4/19/97 Milled on OBSTRUCTION in the 7" CSG from 12127' to 12129' CTM. Left 2.7" Mill In Hole. NIP (12026 - 12027, OD 3500) TUBING ----- (0- 12037, OD:3.500, ID 2.992) Ped _ (12136- 121b9( _.__ .- ~ COi'lOC ~ ~ ~ oPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 August 11, 2009 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7~' Avenue, Suite 100 Anchorage, AK 99501 : ; ~,~~;~~~ t,. .~: `ti~'~'~:;k...: , _J~.~ Dear Mr. Maunder: ~ ~p~~ ~~ ~ ,. J~-~ Enclosed please find a spreadsheet with a list of wells from the Kuparuk field (KRU). Each of these wells was found to have a void in the conductor. These voids were filled with cement if needed and corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The cement was pumped July 30~' 2009 and the corrosion inhibitor/sealant was pumped August 8~', 9~' and 10~' 2009. The attached spreadsheet presents the well name, top of cement depth prior to filling, and volumes used on each conductor. Please call Perry Klein or MJ Loveland at 907-659-7043, if you have any questions. Sincerely, ~~~~ MJ Lov land ConocoPhillips Well Integrity Projects Supervisor ~ ~ ConocoPhillips Alaska Inc. Surtace Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (70-404) Kuparuk Field Dat@ 08/11/09 ~r± ~u ~ir 4_ ~n o..a Well Name API # PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhib+tor Corrosion inhibitor/ sealant date bbls al 3G-12 50103201310000 1900730 24' 4.00 20" 7/30l2009 4.25 8/10/2009 3G-13 50103201370000 1901160 17" n/a 17" n/a 2.97 8/10/2009 3G-15 50103201390000 1901210 18" n/a 18" n/a 2.97 8/10/2009 3G-23 50103201440000 1901320 17" n/a 17" n/a 1.27 8/10l2009 3H-02 50103200830000 1871070 21" n/a 21" n/a 3.82 8/8/2009 3H-06 50103200780000 1870780 8'5" 2.00 18" 7/30/2009 5.52 8/8l2009 3H-07 5U103200790000 1870790 17" n/a 17" n/a 2.97 8/8/2009 3H-09 50103200860000 1871120 17" n/a 17" n/a 5.52 8/8/2009 3H-10B 50103200870200 2031600 16" n/a 16" n/a 2.55 8/8/2009 3H-12 50103200880000 1871290 2'7" n/a 2'7" n/a 8.92 8/9/2009 3H-15 50103200820000 1871030 19" n/a 19" . n/a 3.4 8/9/2009 3H-16A 50103200960100 2000220 15' 2.75 17" 7/30/2009 1.7 8/9/2009 3H-18 50103200950000 1880090 SF n/a 17" n/a 5.52 8/9/2009 3H-20 50103200930000 1871340 16' 3.75 16" 7/30/2009 2.25 8/9/2009 3H-22 50103200970000 1880110 27'6" 4.25 21" 7/30/2009 8.5 8/9/2009 H-25 50103202030000 1990400 30" n/a 30" n/a 7.65 8/9/2009 3H-26 50103202080000 1940290 SF n/a 9" n/a 2.12 8/9/2009 3H-28A 50103202360100 1960370 SF Na 18" n!a 5.1 8/9/2009 3H-32 50103203220000 2000010 10" n/a 10" n/a 1.27 8/9/2009 3K-102 50029233786000 2071650 n/a n/a 5" Na 1.27 8/8/2009 3Q-01 50029222200000 1911250 15'7" 2.00 17" 7/30/2009 4.25 8/8l2009 3Q-02 50029216880000 1870040 41' 4.75 21" 7/30/2009 5.52 8/8/2009 3Q-04 50029222190000 191124~ 4'10" 1.50 16" 7~30/2009 4.25 8/8/2009 3Q-07 50029216820000 1861940 6" n/a 6" n/a 1.7 8/9/2009 3Q-12 50029216770000 1861890 7" n/a 7" n/a 2.97 8/8/2009 3Q-13 50029216640000 1861760 44'6" 5.00 21" 7/30/2009 8.92 8/8/2009 3Q-15 50029216660000 1861780 49'5" 4.50 20" 7/30/2009 9.35 8/8/2009 3Q-16 50029216670000 1861790 46' S.25 30" 7/30/2009 8.5 8/8/2009 Permitto Drill 1990400 DATA SUBMITTAL COMPLIANCE REPORT 7/3/2003 Well Name/No. KUPARUK RIV UNIT 3H-25A Operator CONOCOPHILLIPS ALASKA INC MD 15240 TVD 5982 Completion Dat 6/29/1999 Completion Statu SUSP Current Status SUSP APl No. 50-103-20203-01-00 UIC N REQUIRED INFORMATION Mud Log N_~o Sample No Directional Survey N_go DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type Media Fmt (data taken from Logs Portion of Master Well Data Maint) D R R R R R R Interval Log Log Run OH I Dataset Name Scale Media No Start Stop CH Received Number Comments ~-GR/EWR4-MD , 2/5 FINAL U,i~GPJEWR4-MD 2/5 FINAL ~D~ PJEWR4-M D 2/5 FINAL c.J~EWR4-~D 2/5 FINAL '-I~PJEWR4-TVD 2/5 FI NAL ~D~PJEWR4-'I'VD 2/5 FINAL 9064 2,6 9065 2 9066 2,5 SRVY RTP SRVY RPT 11170 15195 Open 11/18/1999 ~:J'~64 11170-15195 11170 13200 Open 11/18/1999 ~J'~66 11170-13200 11170 14414 Open 11/18/1999 ~J~65 11170-14414 11215 13247 OH 11/22/1999 11215-13247 PB2 11215 14458 OH 11/22/1999 11215-14458 PB1 11215 15240 OH 11/22/1999 11215-15240 5382 5865 OH 11/22/1999 5382-5865 PB2 5382 5959 OH 11/22/1999 5382-5959 PB1 5382 5973 OH 11/22/1999 5382-5973 OH 11/18/1999 /-~:J~064 SPERRY MPT/GPJEWR4 OH 11/18/1999 ~_.9e65 SPERRY MPT/GR/EWR4 PB1 OH 11/18/1999 ~J0~6 SPERRY MPT/GPJEWR4 PB2 12104 15240 OH 7/15/1999 SPERRY 12104,45-15240. 11157 14458 OH 7/15/1999 SPERRY 11157.70-14458. PB1 12104 13247 OH 7/15/1999 SPERRY 12104.45-13247. PB2 SRVY RPT Well Cores/Samples Information: Name Start Interval Stop Sent Dataset Received Number Comments ADDITIONAL INFORMATION Permitto Drill 1990400 DATA SUBMITTAL COMPLIANCE REPORT 7~3~2003 Well Name/No. KUPARUK RIV UNIT 3H-25A Operator CONOCOPHILLIPS ALASKA INC MD 15240 'I'VD 5982 Well Cored? Y/~,,~ Chips Received? ---Y-.~.".' -~ Analysis R~.r~.iv~.d ? Completion Dar 6/29/1999 Completion Statu SUSP Current Status SUSP Daily History Received? ~ N Formation Tops Y ~ APl No. 50-103-20203-0'1-00 UIC N Comments: Compliance Reviewed By: Date: WELL LOG TRANSMITTAL To.' State of Alaska Alaska Oil and Gas Conservation Cornrn. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 / q c~. ~ 6i C9 November 23, 1999 RE: MWD Formation Evaluation Logs 3H-25A, PB 1 & PB2 AK-MM-90125 The technical data listed below is being submitted herewith. Please address any problems or concems to the attention off Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 31t-25A: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-103-20203-01 2"x 5" TVD Resistivity & ~a Ray Logs: 50-103-20203-01 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia $1t-25A PB1: 2"x 5" MD Resistivity & Gamma Ray Logs: 50-103-20203-70 2"x 5" TVD Resistivity & Gamma Ray Logs: 50-103-20203-70 $It-25A PB2: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-103-20203-71 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline . t '£ 9_ 'i999 1 Folded Sepia 2" x 5" TVD Resistivity & Gamma Ray Logs: ,a!a a,0il & Gas cons. Commission 50-103-20203-71 An~oro~o 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax' 907-273-3535 A Halliburton Company 0 !:t I I_1--1 ~ [~ C:;EFtVI C E ~ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 lVlWD.F~ation Evaluation Lags November 18, 1999 ..oqO qoU H .AK-MM-90125 1 LDWG forma~ed Disc with vefificationlistir~ API#: 50-103-20203-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPY OF ~ TRANSMITTAL LETYER TO THE ATTENTION OF: Sperry-Sun. Drilling.Service Atto: Jim Gal~ 5631 Silver~to.W_ay, Suite G. Anchorage, Alaska 99518 RECEIVED :..~v ~ ~ 1999 Date: ..... Ala~ Oil & ~as Cons. ~i~io.n ~chomge Signed: 5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax: 907-273-3535 A Halliburton Company t' To: WELL LOG TRANSMITr~ State of Alaska Alaska Oil and Gas Conservation Cornrn. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs November 18, 1999 3H-25A PB 1, AK-MM-90125 1 LDWG formatted Disc with verification listing. API#: 50-103-20203-70 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPY OF THE TRANSMITTAL LETTER TO ~ ATTENTION OF: Sperry-Sun Drilling Service Attn: JLrn Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 RECE!VED ....~\,r ~. :.?: -* . ' Date: ':'~ '.' ). ~ _!~ S~gne ,,~.~, 0il & Gas Cons. C0mmimi0n 2) gn~horago 5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax: 907-273-3535 A Halliburton Company WELL LOG TRANSM1TFAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs .oq° 3H-25A PB2, November 18, 1999 AK-MM-90125 1 LDWG formatted Disc with verification listing. API#: 50-103-20203-71 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Service Attn: Jim Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 RECEIVED ',":"': "" '!999 Date: :,~,~ Oil & Gas Cons. Commi~ion Anchorage 5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax: 907-273-3535 A Halliburton Company ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 November 2, 1999 Mr. Robert N. Christenson Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: 3H-25A (Permit No. 99-40) Well Completion Report Dear Mr. Commissioner: Enclosed is the well completion report for the completion on 3H-25A. If there are any questions, please call 265-6120. Sincerely, G. C. Alvord Drilling Engineering Supervisor AAI Drilling GCA/skad i" STATE OF ALASKA (" ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Wefl,~ ~,.~ Oil B Gas D Suspended Abandoned ~ Se~ice D 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 99-40 3. Address 8. APl Number,, ¢~q.. P. O. Box 100360, Anchorage, AK 99510-0360 ~ ~ 50-103-20203:~'t 4. Location of well at sudace . .... ~~' 9. Unit or Lease Name 1220' FNL, 281' FWL, Sec. 12, T12N, R8E, UM ~ Kuparuk River Unit 1386' FSL, 1420' FWL, Sec. 3, T12N, R8E, UM 3H-25A At Total Depth :;..~7..'~ '.~ ~ . -- 11. Field and Pool 998' FNL, 193' FEL, Sec. 4, T12N, R8E, UM .......... . ....... .. Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Kuparuk River Pool RKB 68' feetI ADL 25524 ALK 2655 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. 115. Water Depth, if o~hore 16. No. of Completions May 30, 1999 June 23, 1999 June 29, 1999I N/A feet MSL 1 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Su~ey ~20. Depth where SSSV set 21. Thickness of Permafrost 15240' MD / 5982' TVD 11058'MD/5324'TVD YES ~ No ~I N/A feetMD 1700'(approx) 22. Type Electric or Other Logs Run ~WD/G ~Res/PWD 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER ~. GRADE TOP BO~OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5¢ H-40 Surface 121' 24" 2oosxAS I 9.625" 47¢ / 36¢ L-80 / J-55 Surface 4751' 12-1/4" 780 sx AS III, 740 sx Class G &125 sx ASl cmt top job 7" 26¢ L-80 Surface 12391' 8-1/2" 25o sx Cl~s G Baker cement retainer ~ 11136' 24. Per~oratio.s ope. to Production (MD + TVb o~Top an~ Bottom an~ 2~. TUB~Ne RECORD ~ ~ I I ~ ~ I inte~l, ~ize ~nd number) SIZE DEPTH SET (MD) PACKER SET (~D) N/A N/A packer ~ 11205' in odgin~l wellbo~e 2~. ACID, FRAOTURE, OEMENT SQUEEZE, ETC. N/A DEPT~ I~T~VAL (MD) AMOUNT ~ KIND OF ~ATE~I~b USED ~ bbl~ oement ~ top ~¢ ret~i~er ~ 1~ bbl M~der est. TOC ~ 11058' 27. P~ODUCTIO~ TEST D~te First Pro~MotioR Method of Operation (Flowing, g~s li~, eto.) N/A Date o¢~8~t Hour~ Te~tsd Production for OIL-BBb ~AS-MCF WATE~-BBL OHOKE SIZE I~AS-OIL ~ATIO I Test Period > Flow TMbi~g C~si~g Pre88Mr8 C~loMl~te~ OIL-~B~ ~AS-MOF WATER-BBL Olb ~RAVITY - APl (oorr) 24-Hour Rate > 28. CORE DATA Brief desoriptio~ ~¢ lit~ology, porosity, ffaoture~, ~pp~re~t dip~ ~ pres~e~oe o¢ oil, gas or w~ter. SMbmit oore ohip~. Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity. ME. AS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. N/A N/A 31. LIST OF ATTACHMENTS Summary of Daily Operations, Directional Survey 32. I hereby certify that the following is true and correct to the best of my knowledge. Questions? Call Mark Chambers 265-1319 Signed .4~ ~_ ~ Title DrillinqEngineerinqSupervisor Date Chip Alvord INSTRUCTIONS Prepared by Sharon AIIsup-Drake General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 Date: 8/4/99 ARCO ALASKA INC. WELL SUMMARY REPORT Page: 1 WELL:3H-25A WELL_ID: AK9997 TYPE: STATE:ALASKA AREA/CNTY: NORTH SLOPE WEST FIELD: KUPARUK RIVER UNIT SPUD:05/25/99 START COMP: RIG:NORDIC 3 WI: 0% SECURITY:0 API NUMBER: 50-103-20203-01 BLOCK: FINAL: 05/24/99 (D1) MW: 0.0 VISC: 0 PV/YP: 0/ 0 APIWL: 0.0 TD: 0'( 0) CINTRO MUD FROM 12.1PPG TO 10.0 FOR WELL KILL SUPV:DEARL W. GLADDEN Move rig from iL pad to 3H pad. Accept rig ~ 1730 hrs. 5/24/99. MIRU. UPCOMING OPERATIONS:HOLD WELL KILL PJSM - KILL WELL - SET BPV - N/D TREE - N/U BOPS 05/25/99 (D2) MW: 10.0 VISC: 42 PV/YP: 12/16 APIWL: 3.8 TD:11975'(11975) CONTINUE TESTING BOPE. PULL 3.5" TBG HANGER TO RIG FLOOR 100 SUPV:DONALD L. WESTER Safety meeting. Pump down tubing to kill well. N/D tree. N/U BOPE and test. UPCOMING OPERATIONS:RUN 3.5" TBG BACK IN HOLE LAY 10 BBL P & A CEMENT PLUG @ 11975' UP TO 11714'. LAY DOWN 3.5" TBG. 05/26/99 (D3) MW: 10.0 VISC: 43 PV/YP: 12/16 APIWL: 3.6 TD:l1714'( 0) CONTINUE TO LAY DOWN 373 JOINTS TOTAL 3.5" TBG & JEWELRY. PI .SUPV:DONALD L. WESTER Pull 3.5" tubing. Pump cement plug. UPCOMING OPERATIONS:RIH TO 11250' CIRC. POOH FOR WHIP STOCK. 05/27/99 (D4) MW: 10.0 VISC: 74 PV/YP: 15/33 APIWL: 3.6 TD:l1714'( 0) POOH L/D BIT & SCRAPER. M/U TORQUEMASTER, 'PACKER, WHIP-STOCK SUPV:DONALD L. WESTER Continue to pull tubing. RIH with casing scraper. UPCOMING OPERATIONS:RIH TO 11205' NORDIC DEPTH, SET PACKER, WHIP-STOCK & CUT WINDOW. 05/28/99 (D5) MW: 10.0 VISC: 53 PV/YP: 15/30 APIWL: 3.2 TD:l1215'( 0) CONTINUE CUTTING WINDOW OFF WHIPSTOCK 11,186'-11,198' FORMAT SUPV:DONALD L. WESTER RIH w/ Baker 7" TorqueMaster Whipstock w/milling assy. Set Whipstock top ~ 11186' and packer ~ 11205'. Shear off and start window. UPCOMING OPERATIONS:COMPLETE WINDOW, FORMATION TEST 13.5 PPG, TRIP FOR DRILLING ASSEMBLY. Date: 8/4/99 ARCO ALASKA INC. Page: 2 WELL SUMMARY REPORT 05/29/99 (D6) MW: 10.0 VISC: 44 PV/YP: 11/21 APIWL: 3.4 TD:l1215'( 0) CONTINUE TO P/U 3-1/2" DP OFF RACK TOTAL OF 150 JOINTS. CON SUPV:DONALD L. WESTER ~ Continue cutting 7" window from 11186' to 11198', drill formation to 11215'. FIT test, EMW = 13.6 ppg. POOH w/mill. UPCOMING OPERATIONS:DIRECTIONAL DRILL 6-1/8" HOLE F/ 11,215' 05/30/99 (D7) MW: 10.0 VISC: 42 PV/YP: 13/23 APIWL: 3.8 TD:11772'( 557) DIRECTIONAL DRILLING 6-1/8" HOLE @ 11970' SUPV:DONALD L. WESTER Slide thru window 11186' to 11198' and 5' in open hole to 11203'. Start pumps clean out 6.125" hole to 11215' Continue to slide and rotate to 11772' UPCOMING OPERATIONS:CONTINUE DRILLING 6-1/8" HOLE 05/31/99 (D8) MW: 10.0 VISC: 41 PV/YP: 14/23 APIWL: 3.0 TD:12451'( 679) CONTINUE SHORT TRIP TO 12,358'. TRY TO WASH AND REAM TO BOTT SUPV:DONALD L. WESTER Continue directional drilling 6.125" hole from 11772' to 12451' Short trip f/12451' up to shoe ~ 11186' UPCOMING OPERATIONS:CONTINUE DRILLING A HEAD W/ 6-1/8 HOLE. 06/01/99 (D9) MW: 10.0 VISC: 46 PV/YP: 13/18 APIWL: 3.8 TD:13324'( 873) DRILL 6 1/8" HOLE SUPV:D. GLADDEN/T. BRASSFIELD TIH, break circ ~ 12354', hole packing off, Rotate, Recip and back ream to 12258. Ream and wash 12258 to bttm. Drilling 6.125" hole from 12451' to 13324' UPCOMING OPERATIONS:DRLG -WEIGHT UP TO 10.5PPG - SHORT TRIP - DRLG 06/02/99 (D10) MW: 10.5 VISC: 49 PV/YP: 14/21 APIWL: 4.2 TD:13730'( 406) DRILLING AHEAD ~ 13960', ECD AT 12.4 PPG EMW SUPV:D. GLADDEN/T. BRASSFIELD Drilling from 13324' to 13630' MD. Backreamed from 13261' to 12979'. Drilling from 13630' to 13730' UPCOMING OPERATIONS:DRILL TO TOP OF KUPARUK @14957' MD 06/03/99 (Dll) MW: 10.5 VISC: 60 PV/YP: 15/18 APIWL: 3.6 TD:14306'( 576) MAKING WIPER TRIP TO 12,400', CURENTLY PUMPING AND BACKREAMI SUPV:D. GLADDEN/T. BRASSFIELD Drilling from 13730' to 14306' UPCOMING OPERATIONS:DRILL INTO KUPARUK SANDS 06/04/99 (D12) MW: 10.5 VISC: 49 PV/YP: 16/17 APIWL: 2.6 TD:14306'( 0) TIH FROM 11389' AFTER WIPER TRIP SUPV:D. GLADDEN/T. BRASSFIELD Continue to circulate for wiper trip. Circulate and back ream each stand out of hole. Hole packing off periodically. Cuttings off shakers very fine, dense material with varying quantities. POOH. UPCOMING OPERATIONS:DRILL KUPARUK SANDS Date: 8/4/99 ARCO ALASKA INC. Page: 3 WELL SUMMARY REPORT 06/05/99 (D13) MW: 10.5 VISC: 48 PV/YP: 13/23 APIWL: 3.2 TD:14393'( 87) CIRCULATE/CONDITION & PREP TO POOH-CURRENT DEPTH ~ 14458' (5 SUPV:D. GLADDEN/T. BRASSFIELD POOH to 11389' pumping and back reaming. Wellbore cleaned-up. RIH. Reaming and circulating from 13800' Drilling from 14306' to 14393' UPCOMING OPERATIONS:TEST BOPE, CHANGE OUT BHA 06/06/99 (D14) MW: 10.5 VISC: 48 PV/YP: 16/18 APIWL: 3.2 TD:14458' ( 65) TIH W/ NEW BHA AT 3400' SUPV:D. GLADDEN/T. BRASSFIELD Drilling from 14393' to 14458' Pump and backream first 15 stands. Tight spot from 13820' to 13858'. Safety meeting. Test BOPE's. UPCOMING OPERATIONS:DRILL KUPARUK SANDS/CHANGE OVER TO BARADRILN 06/07/99 (D15) MW: 10.5 VISC: 44 PV/YP: 13/14 APIWL: 2.9 TD:14458'( 0) POOH FOR BIT CHANGE SUPV:D. GLADDEN/T. BRASSFIELD Completed BOPE 250/3500 psi. RIH. Circulate bottoms up. Back ream and punp, no return flow, hole packing off. Backream and wash to 11252' UPCOMING OPERATIONS:DRILL KUPARUK SANDS 06/08/99 (D16) MW: 10.6 VISC: 44 PV/YP: 13/16 APIWL: 2.5 TD:14458'( 0) DRILLING AT SUPV:D. GLADDEN/T. BRASSFIELD Circulate and reciprocate. Pump sweep. Break circulation, packing off. Ream and wash down. Work through tight spot 11963'-11996' UPCOMING OPERATIONS:CHANGE OVER TO BARADRILN 06/09/99 (D17) MW: 10.5 VISC: 55 PV/YP: 21/21 APIWL: 2.5 TD:14458'( 0) DOWNLOADING AND TESTING MWD. MAKING UP BHA. (NOTE NEW BIT: SUPV:D. WESTER/ S. GOLDBERG Continue washing and reaming from 11196' to 12287' Survey at 12256'. Continue washing and reaming to 12351' MWD failure. Attempting to get MWD functional. UPCOMING OPERATIONS:RUN IN HOLE TO CONTINUE CLEANING OUT WELL TO 14,458' DRILL AND LOG TO BASE OF KUPARUK A1 SAND 06/10/99 (D18) MW: 10.8 VISC: 62 PV/YP: 19/33 APIWL: 3.5 TD:14458' ( 0) ROTATING AHEAD AT 12,532' APPROX 50/50 ROTATE/SLIDE RATIO. SUPV:D. WESTER/ S. GOLDBERG Safety meeting. RIH with new assembly. Tested MWD, pulsed OK. Wash and ream to 12200'. Survey well at 12259'. Rotate down to 12302' and survey well. UPCOMING OPERATIONS:CONTINUE DRILLING TO BASE OF KUPARUK A SANDS Date: 8/4/99 ARCO ALASKA INC. Page: 4 WELL S~RY REPORT 06/11/99 (D19) MW: 10.5 VISC: 64 PV/YP: 17/26 APIWL: 4.0 TD:12865'( 0) DRILLING AHEAD AT 13040' MD SUPV:D. WESTER/ S. GOLDBERG Drilling ahead from 12395' to 12865' UPCOMING OPERATIONS:CONTINUE DRILLING DOWN TO KUPARUK SANDS, SHORT TRIP 06/12/99 (D20) MW: 10.5 VISC: 61 PV/YP: 23/25 APIWL: 4.0 TD:13247' (382) PULLING OUT OF HOLE AT APPROX 4500' SUPV:D. WESTER/ S. GOLDBERG Drilling ahead from 12865' to 13124'. Wash and ream. Drilling ahead from 13124' to 13247' UPCOMING OPERATIONS:CONTINUE PULLING OUT OF HOLE. TEST BOPE. MAKE UP NEW BIT AND BHA 06/13/99 (D21) MW: 10.5 VISC: 64 PV/YP: 22/24 APIWL: 4.0 TD:13247'( 0) WASHING AND REAMING LAST FOUR STANDS TO BOTTOM SUPV:D. WESTER/ S. GOLDBERG Continue tripping out of hole. Well not taking correct fill. Monitor and continue pulling out of hole slowly. Damage to Inteq motor. Test BOPE to 250/3500 psi. OK. UPCOMING OPERATIONS:CONTINUE DRILLING TO BASE OF KUPARUK A SANDS 06/14/99 (D22) MW: 10.5 VISC: 59 PV/YP: 15/26 APIWL: 4.0 TD:13247'( 0) DRYING MOTOR ON #2 PUMP. SUPV:D. WESTER/ S. GOLDBERG Continue RIH to 11154' w/bit #5. Wash & ream to 12950' started packing off. Continue trying to clean hole w/one pump hole tight working up. Due to damage of pump #2 pull out of hole. Working on mud pumps. UPCOMING OPERATIONS:WASH & REAM THRU ALL BAD HOLE. 06/15/99 (D23) MW: 11.1 VISC: 48 PV/YP: 16/17 APIWL: 4.8 TD:12480'( 0) DRILLING AT 12,542' IN 2ND SIDETRACKED WELLBORE SUPV:D. WESTER/ D. GLADDEN/ T. BRAS Working on mud pump traction motors. Installed heater to help dry. Tested traction motors/mud pump. Wash and ream from 12027' to 12480'. Confirm a second sidetrack off the original wellbore ~ approx. 12239'. Swap over mud to 11.1 ppg 9% KC1 LSND mud system. UPCOMING OPERATIONS:DRILL AHEAD 06/16/99 (D24) MW: 11.0 VISC: 40 PV/YP: 14/15 APIWL: 4.8 TD:12896' ( 416) CIRCULATING BOTTOMS-UP AT 13091' (5878' TVD) FOR SHORT TRIP SUPV:D. GLADDEN/ T. BRASSFIELD Drilling from 12480' to 12588'. Pump and circulate high weight viscosified sweep. Hole packing off. Drilling from 12588' to 12896' UPCOMING OPERATIONS:DRILL AHEAD Date: 8/4/99 ARCO ALASKA INC. Page: 5 WELL SUMMARY REPORT 06/17/99 (D25) MW: 11.1 VISC: 43 PV/YP: 12/15 APIWL: 4.0 TD:13284'(388) DRILLING AT 13403' SUPV:D. GLADDEN/ T. BRASSFIELD Drill from 12896' to 12926', slide from 12926' to 12936', drill from 12936' to 13091' Make short trip to 11737' Tight from 12329' to 12385', some packing off. Clean out to 13091' Hole packing off. Drill from 13091' to 13284' UPCOMING OPERATIONS:DRILL AHEAD 06/18/99 (D26) MW: 11.1 VISC: 43 PV/YP: 13/14 TD:13770' ( 486) DRILLING AT 13800' SUPV:D. GLADDEN/ T. BRASSFIELD Drill from 13284' to 13770' UPCOMING OPERATIONS:DRILL AHEAD APIWL: 5.0 06/19/99 (D27) MW: 11.0 VISC: 39 PV/YP: 11/12 APIWL: 4.8 TD:14061'(291) DRILLING AT 14212' SUPV:D. GLADDEN/ T. BRASSFIELD Wash and ream to bottom at 13770', no fill. Drill from 13770' to 13868' Lost #1 pump. Drill from 13868' to 14061' Slide from 13890' to 13920' and from 13926' to 13946' UPCOMING OPERATIONS:DRILL AHEAD 06/20/99 (D28) MW: 11.1 VISC: 43 PV/YP: 12/12 APIWL: 5.0 TD:14460'(399) DRILLING AT 14560' SUPV:D. GLADDEN/ T. BRASSFIELD Drill from 14061' to 14447'. Slide from 14360' to 14390' Pump weighted sweeps. Circulate and condition bottoms up. Wash and ream to bottom, no fill. Drill from 14447' to 14460' UPCOMING OPERATIONS:DRILL'TO TD 06/21/99 (D29) MW: 11.0 VISC: 44 PV/YP: 13/13 APIWL: 5.4 TD:14845'( 385) DRILLING AT 14933' (5991' TVD) SUPV:D. GLADDEN/ T. BRASSFIELD Drill from 14460' to 14845'. Slide from 14480' to 14510' Pump weighted sweeps at 14525' & 14790'. #1 pump down. Bad pot on middle cylinder. UPCOMING OPERATIONS:DRILL TO TD 06/22/99 (D30) MW: 11.1 VISC: 40 PV/YP: 12/14 APIWL: 3.5 TD:15224'( 379) CIRCULATING AND CONDITIONING MUD. RAISING MW. WELL TD'D AT SUPV:D. WESTER/S. GOLDBERG Drill from 14845' to 15224' UPCOMING OPERATIONS:CONTINUE C&C MUD. MAKE MAD PASS FOR DEEP RESISTIVITY. CONTINUE WITH SHORT TRIP TO ABOVE TROUBLE SPOT Date: 8/4/99 ARCO ALASKA INC. Page: 6 WELL SUMMARY REPORT 06/23/99 (D31) MW: 11.3 VISC: 41 PV/YP: 14/14 APIWL: 2.8 TD:15240'( 16) CIRCULATING AND CONDITIONING MUD. PUMPING SWEEPS AROUND. SUPV:D. WESTER/S. GOLDBERG Drilling ahead to TD ~ 15240' MD. Circulate and condition mud. Increase weight to 11.3 ppg. Begin pumping out of hole. Pulling tight at 14925' MD. Work pipe trying to free up. Unable to work rotation down to BHA. Able to circulate freely. Pipe stuck with bit at 14295' MD. RIH with Free POint indicator tool. Shows pipe stuck at 12250' UPCOMING OPERATIONS:RE-RUN FREE POINT INDICATOR. DETERMINE GOOD BACK OFF POINT 06/24/99 (D32) MW: 11.3 VISC: 42 PV/YP: 16/13 APIWL: 2.4 TD:15240'( 0) LAYING DOWN BHA SUPV:D. WESTER/S. GOLDBERG Take last free point check at 11,500, free. Pump tandem sweeps around. Little success with sweeps. Start to work a little torque into string and slacking off weight. Pipe came free. POOH very slowly while backreaming. Pulled tight every 30' as tool joint passed window. UPCOMING OPERATIONS:TEST BOPE. MAKE UP HOLE OPENER AND BHA. 06/25/99 (D33) MW: 11.3 VISC: 42 PV/YP: 14/12 APIWL: 2.6 TD:15240'( 0 WASHING AND REAMING DOWN AT 12,500 SUPV:D. WESTER/S. GOLDBERG Test BOPE from 300/3500 psi. RIH with hole opener. Vary flowrate from 237 to 347 gpm. Continue running in hole. Lose weight at 12358'. Wash down a stand. Hole began packing off. UPCOMING OPERATIONS:CONTINUE TRIPPING IN HOLE WITH HOLE OPENER 06/26/99 (D34) MW: 11.5 VISC: 41 PV/YP: 16/16 APIWL: 2.4 TD:15240'( 0) LAYING DOWN BHA. SLIP AND CUT DRILLING LINE SUPV:D. WESTER/S. GOLDBERG Continue to RIH. Taking weight at 12588'. Hole packing off. Wash and ream hole. Hole continually packing off. Wash and ream from 12250' to 12588'. Trying various flowrates and reaming methods, no success. Circulate and condition mud. Increase mud weight to 11.5 ppg. Rotating and reciprocating pipe. Lots of solids unloading at shakers. Hole packing off. Pull 1 stand and continue circulating. Solids still unloading at shakers. Pull up to shoe. Tight spot at 11840' UPCOMING OPERATIONS:MAKE UP HOLE OPENER BHA W/O STABALIZERS AND RIH Date: 8/4/99 ARCO ALASKA INC. Page: 7 WELL SUMMARY REPORT 06/27/99 (D35) MW: 11.5 VISC: 41 PV/YP: 13/14 APIWL: 3.5 TD:15240'( 0) TRIPPING OUT OF HOLE SUPV:D. WESTER/S. GOLDBERG make up fixed cutter hole opener. RIH to window at 11180'. Wash and ream from 12200' to 12347' Hole packing off. Work with various flowrates. Hole packed off quickly at 12347' Hole caved in on drillstring. No circulation, no pipe movement, no rotation. Pipe stuck at 12347' Good jar action. Jarring up. Working torque into pipe. Pipe would free up momentarily and then stick again. Wellbore deteriorating with each trip. UPCOMING OPERATIONS:??? WAITING ON ORDERS 06/28/99 (D36) MW: 8.5 VISC: 0 PV/YP: 0/ 0 APIWL: 0.0 TD:15240'( 0 PULLING OUT OF HOLE LAYING DOWN DRILLPIPE (CEMENT SUCCESSFUL SUPV:D. WESTER/S. GOLDBERG Continue tripping out of hole slowly to window. Circulate and condition well at window. RIH w/cement retainer. Set mechanical cement retainer at 11136' UPCOMING OPERATIONS:FREEZE PROTECT WELL. CONTINUE LAYING DOWN DP. UNLOAD PIPESHED AND PREP RIG FOR MOVE 06/29/99 (D37) MW: 8.4 VISC: 0 PV/YP: 0/ 0 APIWL: 0.0 TD:15240'( 0) RIG PREPARING TO LEAVE 3H PAD SUPV:D. GLADDEN/T. BRASSFIELD Stab into cement retainer. Pump cement and squeeze. Freeze protect wellbore. N/D BOPs. Prepare rig for move. UPCOMING OPERATIONS:MOVE RIG & CAMP FROM 3H PAD TO 2T PAD (21.9 MILE MOVE) 06/30/99 (D38) MW: 8.4 VISC: 0 PV/YP: 0/ 0 APIWL: 0.0 TD:15240'( 0) MOVING RIG TO 2T 220 SUPV:D. GLADDEN/T. BRASSFIELD Finish moving rig off well. Release rig at 1500 hrs. UPCOMING OPERATIONS: 0 !:! I Cl--I !~ G S E I::! ~ I I-- I::: S 13-Jul-99 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 3H-25A Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 12,104.45' MD 12,201.00' MD 15,240.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, ,, ~! I!... '15 1999 A~aska 0il & Gas Cons. Commission .Anchorage William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company Prudhoe Bay Unit Alaska State Plane Zone 4 Kuparuk 3H, Slot 3H-25 3H-25A Job No. AKMMg0125, Surveyed: 23 June, 1999 SURVEY REPORT 13 July, 1999 Your Reft AP!-501032020301 Surface Coordinates: 6000437.54 N, 498655.50 E (70° 24' 44.7458" N, Kelly Bushing: 60.5Oft above Mean Sea Level ORIGINAL RECEIVED ." Il 15 1999 Alaska Oil & Gas Cons, Commission Anchorage 150° 00' 39.4160" W) 13 R ! i_ I.. I N {3 S W R V I {:: ~ ~ Survey Ref: svy8638 A HALLIBURTON ~'OMPA.NY Sperry-Sun Drilling Services Survey Report for 3H-25A Your Ref: API-501032020301 Job No. AKMM90125, Surveyed: 23 June, 1999 Prudhoe Bay Unit Measured Depth (ft) Incl. .12104,45 .12201.00 12256.72 12359.86 12418.38 12449.87 12549.92 12647.23 12737.93 12839.65 12934.87 13025.00 13130.33 13230.53 13323.21 ~ 13421.91 13519.74 ,13615.44 13715.56 13807.79 13863.00 13905.48 14ooo.ol 14098.94 14195.93 72.ooo 80.970 85.11o 84.960 84.51o 84.880 87.560 87.400 87.000 86.220 85.990 85.700 84.660 85.270 86.21o 87.OLO 87.16o 87.930 89.910 89.820 91.29o 89.51o 87.260 87.1oo 86.660 Azim. 318.85o 324.590 326.950 326.350 324.450 325.380 324.320 323.960 324.550 323.530 323.260 323.750 322.470 323.490 325.71o 327.780 331.o4o 33o.51o 334.660 332.980 333.680 333.OLO 332.000 330.580 330,260 Sub-Sea Depth (ft) 5728.15 5750.71 5757.46 5766.39 5771.76 5774.67 5781.26 5785.54 5789.97 5795.99 5802.46 5808.99 5817.84 5826.63 5833.52 5839.35 5844.33 5848.43 5850.32 5850.54 5850.00 5849.70 5852.37 5857.24 5862.51 Vertical Depth (ft) 5788,65 5811.21 5817.96 5826.89 5832.26 5835.17 5841.76 5846.04 5850.47 5856.49 5862.96 · 5869.49 5878.34 5887.13 5894.02 5899.85 5904.83 5908.93 5910.82 5911.04 5910.50 5910.20 5912.87 5917.74 5923.01 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 2863.34 N 9386.80W 6003302.57 N 489269.21 E 2936.97 N 9444.80W 6003376.21 N 489211.22 E 2982.69 N 9475.90W 6003421.94 N 489180.13 E 3068.52 N 9532.39W 6003507.78 N 489123.66 E 3116.49 N 9565.48W 6003555.75 N 489090.58 E 3142.15 N 9583.50W 6003581.41 N 489072.56 E 3223.77 N 9640.97W 6003663.04 N 489015.11E 3302.55 N 9697.92W 6003741.84 N 488958.17 E 3376.08 N 9750.84W 6003815.38 N 488905.26 E 3458.27 N 9810.47W 6003897.58 N 488845.65 E 3534.53 N 9867.12W 6003973.85 N 488789.02 E 3606.80 N 9920.58W 6004046.12 N 488735.57 E 3690.74 N 9983.58W 6004130.08 N 488672.58 E 3770.43 N 10043.68W 6004209.78 N 488612.50 E 3845.76 N 10097.21W 6004285.12 N 488558.98 E 3928.15 N 10151.24W 6004367.52 N 488504.97 E 4012.25 N 10200.95W 6004451.62 N 488455.27 E 4095.69 N 10247.63W 6004535.07 N 488408.60 E 4184.52 N 10293.71W 6004623.92 N 488362.54 E 4267.29 N 10334.40W 6004706.69 N 488321.87 E 4316.62 N 10359.18W 6004756.03 N 488297.10 E 4354.58 N 10378.23W 6004793.99 N 488278.05 E 4438.40 N 10421.85W 6004877.81 N 488234.44 E 4525.06 N 10469.32W 6004964.48 N 488187.00 E 4609.28 N 10517.13W 6005048.71N 488139.20 E Alaska State Plane Zone 4 Kuparuk 3H Dogleg Rate (°ll00ft) Vertical Section (ft) Comment 10.938 8.537 0.598 3.323 3.167 2.880 0,4o5 0.785 1.261 0.372 0.631 1.562 1.183 2.595 2.245 3.332 0.976 4.592 1.824 2.949 4.477 2.609 1.443 o.561 9677.59 9762.37 981o.61 9899,48 9950.5o 9978.o9 10065.95 10152.09 10232.28 10322.33 10407.07 lO487.17 10581.03 10670.38 10751.92 10837.05 10919.08 lO998.11 11o79.Ol 11152.37 11196.57 11230.57 11307.03 11388.20 11468.58 TIE ON SURVEY WINDOW POINT Continued.,. 13 July, 1999 - 14:03 - 2 - DrlllQuest Sperry-Sun Drilling Services Survey Report for 3H-25A Your Ref: API-501032020301 Job No. AKMM90125, Surveyed: 23 June, 1999 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim, Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 14291.31 87.170 330.100 5867.65 5928.15 4691.91 N 10564.49W 6005131.35 N 488091.86 E 14388.15 85.660 328.310 5873.70 5934.20 4774.93 N 10613.97W 6005214.38 N 488042.39 E 14485.44 85.580 329.760 5881.13 5941.63 4858.11 N 10663.87W 6005297.57 N 487992.50 E 14582.94 82.940 329.540 5890.88 5951.38 4941.82 N 10712.89 W 6005381.29 N 487943.50 E 14680.59 84.360 328.980 5901.68 5962.18 5025.23 N 10762.49 W 6005464.71 N 487893.91 E 14714.87 84.320 330.250 5905.07 5965.57 5054.66 N 10779.75 W 6005494.14 N 487876.66 E 14746.63 84.480 330.850 5908.16 5968.66 5082.18 N 10795.29W 6005521.66 N 487861.13 E 14773.22 84.470 329.980 5910.72 5971.22 5105.20 N 10808.36W 6005544.68 N 487848.06 E 14808.78 84.040 329.560 5914.28 5974.78 5135.77 N 10826.17W 6005575.25 N 487830.26 E 14840.90 84.160 330.560 5917.59 5978.09 5163.45 N 10842.11W 6005602.94 N 487814.32 E 14873.31 84.300 329.790 5920.84 5981.34 5191.43 N 10858.15W 6005630.92 N 487798.28 E 14905.89 84.870 329.070 5923.92 5984.42 5219.35 N 10874.65W 6005658.85 N 487781.79 E 14939.05 86.570 329.400 5926.39 5986.89 5247.76 N 10891.56W 6005687.27 N 487764.88 E 14970.92 87.420 330.450 5928.06 5988.56 5275.31 N 10907.51W 6005714.81N 487748.94 E 15025.45 91.170 330.110 5928.74 5989.24 5322.65 N 10934.54W 6005762.16 N 487721.92 E 15064.66 93.760 327.970 5927.05 5987.55 5356.24 N 10954.69W 6005795.75 N 487701.78 E 15107.00 96.340 329.740 5923.32 5983.82 5392.33 N 10976.50W 6005831.85 N 487679.97 E 15163.38 96.620 332.420 5916.96 5977.46 5441.36 N 11003.59W 6005880.88 N 487652.89 E 15240.00 96.620 332.420 5908.12 5968.62 5508.82 N 11038.82W 6005948.35 N 487617.67 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Alaska State Plane Zone 4 Kuparuk 3H Dogleg Rate (°/100fi) Vertical Section (ft) Comment 0.560 2.415 1.488 2.717 1.562 3.689 1.946 3.257 1.686 3.119 2.403 2.811 5.222 4.235 6.905 8.565 7.380 4.749 0.000 11547.85 11629.19 11710.99 11792.23 11873.86 11902.44 11928.63 11950.60 1198o.19 12006.82 12033.66 12060.89 12088.71 12115.28 1216o.61 12193.63 12229.26 12275.39 12337.05 PROJECTED SURVEY The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 296.521° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 15240.00ft., The Bottom Hole Displacement is 12337.05ft., in the Direction of 296.521° (True). Continued... 13 July, 1999 - 14:03 - 3 - DrillQuest Sperry-Sun Drilling Services Survey Report for 3H-25A Your Ref: API-501032020301 Job No. AKMM90125, Surveyed: 23 June, 1999 Prudhoe Bay Unit Alaska State Plane Zone 4 Kuparuk 3H Comments Measured Depth (ft) 12104.45 12201.00 15240.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 5788.65 2863.34 N 9386.80 W 5811.21 2936.97 N 9444.80 W 5968.62 5508.82 N 11038.82 W Comment TIE ON SURVEY WINDOW POINT PROJECTED SURVEY 13 July, 1999 - 14:03 - 4 - DrillQuest =n ,i ',r,v-sun I 0 !::! I I_1_ I I~i G S E I::1 ~./I !- E S 13-Jul-99 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 3H-25A PB1 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 11,157.70' MD 11,186.00' MD 14,458.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. ,!UL 15 1999 Alaska 0ii & Gas Cons. Commission Regards, William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company Prudhoe Bay Unit Alaska State Plane Zone 4 Kuparuk 3H, Slot 3H-25 3H-25A PB1 Job No. AKMM90125, Surveyed: 6 June, 1999 SURVEY REPORT 13 July, 1999 Your Ref: API-501032020370 Surface Coordinates: 6000437.54 N, 498655.50 E (70° 24' 44.7458" N, 150° 00' 39.4160" W) Kelly Bushing: 60.5Oft above Mean Sea Level ORIGINAL RECEIVED , ~ Il._ 1 $1999 Alaska Oil & Gas Cons. Commission Anchorage D R I L L I N r= S E Fi V I ~ E ~ Survey Ref: _~vvaSdn Sperry-Sun Drilling Services Survey Report for 3H-25A PB1 Your Ref: API-501032020370 Job No, AKMM90125, Surveyed: 6 June, 1999 Prudhoe Bay Unit Measured Depth (ft) Incl. 11157.20 11157.70 11186.00 11230.53 11262.03 11326.15 11358.62 11422.12 11519.58 11617.o7 11713.84 11811.99 11908.70 12006.95 12104.45 12201.49 12297.17 12390.03 12490.06 12588.44 12684.81 12781.31 12877.98 12974.15 13070.98 64.479 64.476 64.270 63.320 62.350 61.3oo 61.24o 60.880 61.84o 62.31o 61.95o 61.540 61.360 63.480 72.000 80,970 87.OLO 88.12o 88.15o 88.12o 88.030 87.500 88,080 87.840 87.500 Azim. 284.432 284.431 284.41o 286.280 287.630 29o.41o 291.84o 295.260 305.050 3o7,18o 311.4oo 311.38o 31O.lOO 311.OLO 318.85o 324.590 329.18o 327.21o 326.91o 324.890 322.16o 321.39o 322.11o 321.39o 321.16o Sub-Sea Depth (ft) 5292.19 5292.41 5304.65 5324.31 5338.69 5368.97 5384.58 5415,32 5462.12 5507.78 5553.03 5599.49 5645.71 5691.20 5728.15 5750.82 5760.84 5764.79 5768.04 5771.25 5774.48 5778.25 - 5781.97 5785.40 5789.33 Vertical Depth (ft) 5352.69 5352.91 5365.15 5384.81 5399.19 5429.47 5445.08 5475.82 5522.62 5568.28 5613.53 5659.99 5706.21 5751.70 5788.65 5811.32 5821.34 5825.29 5828.54 5831.75 5834.98 5838.75 5842.47 5845.90 5849.83 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (fi) (ft) (ft) 2406.46 N 8696.81W 6002845.57 N 489959.12 E 2406.57 N 8697.25W 6002845.68 N 489958.68 E 2412.93 N 8721.96W 6002852.04 N 489933.97 E 2423.50 N 8760.49W 6002862.61N 489895.45 E 2431.67 N 8787.30W 6002870.79 N 489868.64 E 2450.08 N 8840.73W 6002889.21N 489815.21E 2460.34 N 8867.29W 6002899.48 N 489788.66 E 2482.54 N 8918.22W 6002921.68 N 489737.73 E 2525.46 N : 8992.03W 6002964.61N 489663.93 E 2576.22 N 9061.61W 6003015.40 N 489594.36 E 2630.37 N 9127.80W 6003069.56 N 489528.18 E 2687.54 N 9192.66W 6003126.73 N 489463.33 E 2742.98 N 9257.02W 6003182.18 N 489398,97 E 2799.60 N 9323.18W 6003238.82 N 489332.83 E 2863.34 N 9386.80W 6003302.57 N 489269.21E 2937.35 N 9445.10W 6003376.59 N 489210.93 E 3017.00 N 9497.03W 6003456.25 N 489159,02 E 3095.84 N 9545.92W 6003535.10 N 489110.14 E 3179.74 N 9600.28W 6003619.01N 489055.79 E 3261.16 N 9655.41W 6003700.44 N 489000.68 E 3338.60 N 9712.66W 6003777,89 N 488943.44 E 3414.35 N 9772.32W 6003853.65 N 488883.79 E 3490.21N 9832.12W 6003929.52 N 488824.00 E 3565.69 N 9891.62W 6004005.01N 488764.52 E 3641.17 N 9952.15W 6004080.50 N 488704.01E Alaska State Plane Zone 4 Kuparuk 3H Dogleg Rate (°/100fi) Vertical Section (fi) Comment 0.730 o.73o 4.330 4.9Ol 4.158 3.866 4.747 8.868 1.99o 3.873 o.418 1.177 2.309 11.471 lO.883 7.911 2.433 o.3ol 2.052 2.833 0.968 0.956 0.789 0.424 8923.92 8924.36 8949.52 8989.02 9o16.83 9o73.13 9101.57 9157.12 9242.Ol 9326.22 9408.71 9491.21 9572.55 9656.02 9740.06 9823.41 9903.24 9979.97 10063.75 10147.22 lO231.Ol 10316.32 10401.80 10486.85 10572.84 TIE ON SURVEY WINDOW POINT Continued... 13 July, 1999 - 14:03 - 2 - DrlllQuest Sperry-Sun Drilling Services Survey Report for 3H-25A PB1 Your Ref: AP1-501032020370 Job No. AKMM90125, Surveyed: 6 June, 1999 Prudhoe Bay Unit Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) 13169.13 86.980 320.960 5794.06 5854.56 3717.42 N 10013.77 W 13266.06 86.520 320.710 5799.56 5860.06 3792.45 N 10074.88 W 13363.27 86.020 320.100 5805.88 5866.38 3867,20 N 10136.71 W 13461.17 86.950 321.470 5811.88 5872.38 3942.91 N 10198.49 W 13558.04 86.920 321.160 5817.06 5877.56 4018,41 N 10258.95 W 13653.29 85.870 321,700 5823.05 5883.55 4092.74 N 10318.21 W 13750.95 85.370 323.640 5830.51 5891.01 4170.16 N 10377.26 W 13849.53 84.530 323.830 5839.19 5899.69 4249.34 N 10435.35 W 13946.61 85.280 324.210 5847.81 5908.31 4327.58 N 10492,15 W 14042.97 87.070 324.530 5854.24 5914.74 4405.73 N 10548.16 W 14140,74 86.150 325,280 5860.02 5920.52 4485.58 N 10604.27 W 14237.79 83.710 333.950 5868.61 5929.11 4568.88 N 10653.13 W 14333.87 83.270 341.840 5879.52 5940.02 4657.25 N 10689,03 W 14458.00 83.270 341.840 5894.07 5954.57 4774.38 N 10727.45 W Global Coordinates Northings Eastlngs (ft) (ft) 6004156.76 N 488642.40 E 6004231.81N 488581.30 E 6004306.57 N 488519.49 E 6004382.28 N 488457.72 E 6004457.80 N 488397.28 E 6004532.13 N 488338.02 E 6004609.57 N 488278.99 E 6004688.75 N 488220.92 E 6004767.01 N 488164A3 E 6004845.17 N 488108.13 E 6004925.03 N 488052.04 E 6005008.34 N 488003.19 E 6005096.71N 487967.31E 6005213.86 N 487928.91 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Alaska State Plane Zone 4 Kuparuk 3H Dogleg Rate (°/100ft) Vertical Section (ft) Comment 0.568 0,540 0.810 1.689 0.321 1.239 2.046 0.873 0.865 1.887 1.213 9,246 8.172 0.000 10660,14 10746.48 10833.36 1O92O.58 11OO6,52 11090.89 11176.31 11261.57 11345.29 11428.23 11511.96 11590.47 11659.20 11741.93 PROJECTED SURVEY The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 293.992° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14458.00ft., The Bottom Hole Displacement is 11741.93ft., in the Direction of 293.992° (True). Continued... 13 July, 1999 - 14:03 - 3 - DrillQuest Sperry-Sun Drilling Services Survey Report for 3H-25A PB 1 Your Ref: API-501032020370 Job No. AKMM90125, Surveyed: 6 June, 1999 Prudhoe Bay Unit Alaska State Plane Zone 4 Kuparuk 3H Comments Measured Depth (ft) 11157.70 11186.00 14458.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 5352.91 2406.57 N 8697.25 W 5365.15 2412.93 N 8721.96 W 5954.57 4774.38 N 10727.45 W Comment TIE ON SURVEY WINDOW POINT PROJECTED SURVEY 13 July, 1999 - 14:03 - 4 - DrlllQuest I'1 R I /1_1 I~ I~ S I~ F! U I C~ I=:: S 13-Jul-99 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 3H-25A PB2 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 12,104.45' MD 12,201.00' MD 13,247.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, RECE V , !t JL '1 5 '{999 Alaska 0ii & Gas Cons. C0fnwdssi0n ~cho~a~e William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company Prudhoe Bay Unit Alaska State Plane Zone 4 Kuparuk 3H, Slot 3H-25 3H-25APB2 Job No. AKMM90125, Surveyed: 12 June, 1999 SURVEY REPORT 13 July, 1999 ORIGINAL RECEIVED dUL 15 1999 Alaska Oil & Gas Cons. Commission Anohor~e Your Ref: AP1-501032020371 Surface Coordinates: 6000437.54 N, 498655.50 E (70° 24' 44.7458" N, 150° 00' 39.4160" W) Kelly Bushing: 60.5Oft above Mean Sea Level sper~r',~-sun 13 R I L. I-- I N I~ $ ER V.I !:::. E.S Survey Re,f: svy8642 Sperry-Sun Drilling Services Survey Report for 3H-25APB2 Your Ref: AP1-$01032020371 Job No. AKMM90125, Surveyed: 12 June, 1999 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim, Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (fi) (ft) (ft) 12104.45 72.000 318.850 5728.15 5788.65 2863.34N 9386.80W 6003302.57 N 489269.21 E 12201.00 80.970 324.590 5750.71 5811.21 2936.97 N 9444.80W 6003376.21 N 489211.22 E 12258.80 81.890 326.300 5759.32 5819.82 2984.04 N 9477.22W 6003423.29 N 489178.82 E 12302.14 81.840 327.150 5765.46 5825.96 3019.91N 9500.76W 6003459.16 N 489155.28 E 12355.05 82.240 326.390 5772.78 5833.28 3063.74 N 9529.47W 6003503.00 N 489126.58 E 12451.02 86.980 323.630 5781.80 5842.30 3141.99 N 9584.25W 6003581.25 N 489071.82 E 12546.68 88.670 322.660 5785.43 5845.93 3218.47 N 9641.58W 6003657.74 N 489014.50 E 12645.30 89.350 322.790 5787.13 5847.63 3296.93 N 9701.30W 6003736.22 N 488954.79 E 12740.46 88.890 325.030 5788.59 5849.09 3373.82 N 9757.35W 6003813.11 N 488898.76 E 12839.05 87.820 326.120 5791.42 5851.92 3455.10 N 9813.06W 6003894.41 N 488843.07 E 12936.95 87.700 325.570 5795.25 5855.75 3536.06 N 9867.98W 6003975.37 N 488788.16 E 13034.05 88.860 323.890 5798.16 5858.66 3615.29 N 9924.02W 6004054.62 N 488732.13 E 13130.13 91.450 325.100 5797.90 5858.40 3693.50 N 9979.81W 6004132.84 N 488676.35 E 13247.00 91.450 325.100 5794.95 5855.45 3789.32 N 10046.66W 6004228.67 N 488609.52 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Alaska State Plane Zone 4 Kuparuk 3H Dogleg Rate (°/lOOft) Vertical Section (ft) Comment 10.938 3.330 1.945 1.611 5.709 2.037 o.702 2.4o3 1.549 0.575 2.1o2 2.975 o.o0o 9793.33 9873.59 9920.53 9955.21 9997.55 lOO76.41 10157.05 10240.62 lO32O.19 10401.00 10480.96 10561.35 10641.16 10737.52 TIE ON SURVEY WINDOW POINT PROJECTED SURVEY The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 290.665° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13247.00ft., The Bottom Hole Displacement is 10737.52ft., in the Direction of 290.665° (True). Continued... 13 July, 1999- 14:05 -2- DrlllQuest Sperry-Sun Drilling Services Survey Report for 3H-25APB2 Your Ref: AP1-$01032020371 Job No. AKMM90125, Surveyed: 12 June, 1999 Prudhoe Bay Unit Alaska State Plane Zone 4 Kuparuk 3H Comments Measured Depth (ft) 12104.45 12201.00 13247.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 5788.65 2863.34 N 9386.80 W 5811.21 2936.97 N 9444.80 W 5855.45 3789.32 N 10046.66 W Comment TIE ON SURVEY WINDOW POINT PROJECTED SURVEY 13 July, 1999 - 14:05 - 3 - DrlllQuest 3H-25A Proposed P&A 3-1/2' 5M WKM Gert IV tubing hanger with 3-1/2' L--80 EUE 8rd Msd pin down. "' -- 9.625" 36# J-55 Casing Set ~ 4,751' MD J 3,003' TVD. Top HRZ Type ShaPes Top HRZ K-1 Marker Top Kuparuk D Top C.,4-Sand Top Al-Sand 11 ,~' MD / 5.582' 'I'VD 11,763' MD / 5,63E TVD 13,084' MD / 5,863' TVD 14,597' MD / 5,962' TVD 14,691' MD / 5,977 'I-VD 15,200' MD / 6,005' TVD Top of Whipstock +/-11,191~' MD Original flK8 ,/-I 1,186' MD Nordi~ RKB ..Bo~tqn~ Of WhipstoA:k · 1/- 11,211' MD C)~iginal RKB +1- 11.199' MD Nordic RKI~ C4-Sand 12, t3P · 12,16~' A1 -Sand 12,162'- 12,16§° 7", 26#, L-S0 casing @ 12,391' MD Top of Cement Plug @ +/- 11,0§6' MD Nordic HKB (50' above top of retainer). Baker 7' Cement Retainer Set @ +/- 11,1,36' MD Nordic RKB (50' above top of window). C;. ':~:. '..'..' :!:i. Bottom of Cement Plug @ 4.1- 11,299' MD Nordic RKB (100' below bottom of window), · '. "...;.',. . .... w. TD ~ +/- 15,240' MD Nordic RKB MAC 6/28/99 ~ /~ #~t 9tg t08 ~V}tSVqV 03aV ! EdfC:g : 69-9U-9 'A~ &kr'As ARCO Alaska, Inc. · i . i i iii · ii · ~_ _TRANSMISSI.ON ,, , F.m: .... ~~ ", ~~ ~ ~ ,_ _ L~tion: ~ . ~. _. ~ ~ ~ ~ :- ~. · i . . .... ii i i ii ii i i iii / L~li0n: ~~ ............. ' ., Phone ~Copie~ To: ................... .. - ii ._ i i . .- i i i iiii., i i iiii iii . i ii iii i .. ,,.,, · ,,., , , ,.,,., , _ ii · _' - ......! u _ _ iii · i . iiiii . i . ii · Kuparuk DeveloPment ' P.O. BOXlO0360 ', ANCHORAGE, AK '99510-0360 FAX .ti 907 265-67.2.4 ..... ATO-1279 ',, iii m ,ii ii1!iii i - --' i _ iii_ i ~ iii iii! Subject: Comments: , , .mil, L. ' ............. , ~11 . JUl ,1 .__, 111 ' i ~-vxsvqV 03hn~ '. l~dfTf~: ~ ' OcJ-9~;-9 MEMORANDUM State of Alaska TO: Alaska Oil and Gas Conservation Commission Robert Christenson,~ DATE: June 13, 1999 Chairman THRU: Blair Wondzell, P. I. Supervisor FROM' Lou Grimaldi~0~¢,44__ SUBJECT: Petroleum Insl~ctor ' FILE NO: AC2JFMGF.DOC BOP Test, Nordic 3 Arco 3H-25A Kuparuk River Field PTD #99-0040 Non-Confidential Sunday, June 13, 1999; I witnessed the weekly BOP test on Nordic rig #3 drilling Arco well #3H-25A in the Kuparuk River field. The rig was downloading the MWD tools when I arrived, after approximately two hours the test was begun. The test went very well with all BOPE components functioning properly and holding their pressure test with no leakage observed. The crew seemed well versed in their procedure, which indicated to me familiarity with this procedure. A tour around the rig showed much attention to housekeeping and preventative maintenance is standard for this rig, all in all a good looking rig. SUMMARY: I witnessed the weekly BOP test on Nordic rig #3. Test time 4 hours, No failures. Attachments: AC2JFMGF.XLS cc; Paul Mazzolini (Kuparuk drilling) NON-CONFIDENTIAL STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: 7 Test: Initial X Workover: Nordic Rig No. PTD # 99-40 Arco Alaska Inc Rep.: 3H-25A Rig Rep.: Set @ 12,391 Location: Sec. Weekly X Other TEST'DATA DATE: Rig Ph.# Don Wester 6/13/99 659-7872 Lance Johnson 12 T. 12N R. 8E Mericlian Umiat MISC. INSPECTIONS: Location Gen.: P* Housekeeping: P* (Gen) PTD On Location P Standing Order Posted P Well Sign P Drl. Rig P Hazard Sec. P - FLOOR SAFETY VALVES: Upper Kelly/IBOP Lower Kelly/IBOP Ball Type Inside BOP Test Quart. Pressure P/F 1 250/3500 P 250/3500 P 250/3500 P 250/3500 P BOP STACK: Quan. Annular Preventer Pipe Rams 1 Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Test Press. P/F 250/3000 P 250/3500 P 250/3500 P 250/3500 P 250/3500 I 250/3500 P 2 250/3500 P N/A MUD SYSTEM: Visual Alarm Trip Tank P P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector P P ~ H2S Gas Detector P P '- CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes Test Pressure P/F 12 250/3500 P 30 250/3500 P Functioned Functioned ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained 0 Blind Switch Covers: Master: Nitgn. Btl's: Four Boftles 2250 psi average 2,950 [ P 2,500 P minutes 16 sec. minutes 38 sec. P Remote: P Psig, ' ::~:'~:~:i ,,--~--"~ TEST RESULTS Number of Failures: 0 ,Test Time: ~~lours. Number of valves testea 20 Repair or Replacement of Failed Equipment will be made within N/A ~ Notify the Inspector and follow with Written or Faxed verification to me AOGCC Commission Office at: Fax NO. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-'1433 REMARKS: Good test! * Rig and surrounding area very clean and orderly. Distribution: orig-Well File c - Oper./Rig c - Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Lob Grimaldi FI-021L (Rev.12/94) AC2JFMGF.xls SF_.NT BY' 5-12-59 'lO'07Al~I ' ARCO ALASKA--, 3H-25 P & A Schematic ~ ~ ~c~ 007 276 7542'# 1/ 1 -040 Post-it'" brand fax transmittal memo 7671 J#of pages · ' , d.f 1 fl.,lc I~..~'.",'~~.~· '1~'' ~r , ~5/8" 36~ J-55 cas~ set ~ 4751' MD '~, The plan for 3H-2.~ portion of line cement to top casing. Since sidetrack cot lap, It Is felt tiler cement on top of the lower packer Is unnecessary. Baker - 7" ~l'OrqU~ Master' Whipstock w/Hydraulic Set Permanent Packer. is to drill the sldelrack and run a 4-1/2" Liner. The lower r will be slotted and the upper portion will be solid with of liner. Estimate 150' of cemented liner lap Inside 7" Injection Into perloratlons was unsuccessfull and the lpletlon will contain dual packers and 150' cemented liner Packer Setting Depth tied In with 7" Casing Tally and CBL 3/'11/g4 face Proposed Top of wh.' ipstock @ 11,000' MD. Proposed Bottom of whlpstocl( face @ 11,012' MD, Proposed Bottom of whipstock @ 11,015' MD, Proposed Top of Packer @ 11,015' MD. Top of 3-1/2" Tubing Stub @ +/- 11,gf5' MD. 3.1/2" x 7" Baker 'F~I.,IL' Hydraulic Set Retrievable Production Packet @ +/- 12,011' MD, 3-1/2" tubing and 7? x 3-1/2" annulus pressure tested to 2500 psi prior to setting retainer and cutting tubing, Baker Cement Retainer set in 8' pup joint below pa~,ker @ +/- 12,025' MD. C0il Tubing Unit attempted, unsuccessfully, to establish injection into perforations, Last Tag at 12,111' MD on 4/319g O4-Sand Pods 12,136' - 12,162' 7", 26~, L-80 casing @ 12,391' MD Al-Sand Pods PBTD = 12,309' MD TD -- 12,410' MD 12,162'- 13,166' MAC 5/10~99 TONY KNOWLE$, GOVEF~NOFI ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-31 92 PHONE: (907~ 279-1433 FAX: (907'~ 276-7542 May 12,1999 Chip Alvord Drilling Engineering Supervisor ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0361 Re; Kuparuk River Unit 3H-25A ARCO Alaska. Inc. Permit No: 99-40 Sur Loc: 1220'FNL, 28 I'FWL Sec. 12, TI2N, RSE, UM Btmhole Loc. 406'FSL, 1844'FWL, Sec. 33, TI3N, RSE, UM Dear Mr. Alvord: Enclosed is the approved application for permit to redrill thc above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice max.' be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. obert . t; nstcnson, P. E. Chairman BY ORDER OF THE COMMISSION dlffEnclosures ¢C: Department of Fish & Game, Habitat Section w/o cncl. Department of Environmental Conservation w/o cncl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.005 la. Type of work: Drill [] Redrill [] I lb. Type of well. Re-entry [] Deepen [] I Service [] 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. RKB 31 feet 3. Address 6. Property Designation P.O. Box 100360 Anchorage, AK 99510-036( ADL 25524 ALK 265E 4. Location of well at surface 7. Unit or property Name 1220' FNL, 281' FWL, Sec. 12, T12N, R8E, UM Kuparuk River Unit At top of productive interval 1492' FNL, 159' FWL, Sec 3, T12N, RSE, UM At total depth 406' FSL, 1844' FWL, Sec 33, T13N, R8E, UM Exploratory [] StratigraphicTest [] Development Oil[] Development Gas [] Single Zone [] Multiple Zone [] 10. Field and Pool Kuparuk River Field Kuparuk River Pool 11. Type Bond (see 20 AAC 25.0251) Statewide 8. Well number 3H-25A 9. Approximate spud date May 14, 1999 Number #U-630610 Amount $200,000 12. Distance to nearest property line 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) 162' @ Target feet no close approach feet 2560 16682 ' MD / 6013 ' 'FVD 16. To be completed for deviated wells Kickoff depth: 11012 MD Maximum hole angle 95 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Maximum surface 2649 psig At total depth (TVD) 3300 psig 18. Casing program Settin,(] Depth size Bottom Hole MD TVD 6.125" 4.5" BTC 6013' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total Depth: measured 12410 feet Plugs (meaSured) true vertical 6131 feet Quantity of Cement (include stage data) 109 bbls Class G sidetrack - top of window @ 11000' MD RECEIVED APR 1999 Effective Depth: meaSured 12309 feet true vertical 6060 feet Casing Length Size Cemented Conductor 121' 16" 200 sx AS I Surface 4751' 9.625" 780 sx AS III, 740 sx Class G & 125 sx ASI cmt top job Production 12391' 7" 250 sx Class G Liner Junk (measured) Naska Oil & Gas Cons. Commission Anchorage Measured depth True Vertical depth 121' 121' 4751' 3004' 12391' 6118' Perforation depth: measured 12136'-12166' true vertical 5939'-5960' DUPLICATE 20. Attachments Filing fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling programr~ Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report [] 20 AAC 25.050 requirements [] 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Questions? Call Mark Chambers 265-131(` Signed Chip Alvord · Commission Use Onl} I APlnumber I Approvald. ate_ Date Prenar~-,-I hv .C~h~rnn JSee cover letter J for other requirements Yes [] No Mud Icg required [] No Directionalsurvey required ~ Yes [] Date Conditions of approval Samples required [] Hydrogen sulfide meaSures [] Yes Required working pressure for ROPE [] 2M; Other: ORIGINAL SIGNED' BY Approved by Robert N. Chdstenson by order of the commission Commissioner. Yes [] No No Form 10-401 Rev. 12/1/85 · Submit in triplicate ' 3H-25A Proposed Completion Liner top and Whipstock Depth's are based on Original RKB to the hanger from the 7" Csg Detail. These depths need to be converted to Nordic RKB. 4-1/2" liner top @ +/- 10,850' MD Top of Whipstock at +/-11,000' MD Window in 7" H. 4-1/2" 5M FMC Gen IV tubing hanger with 4-1/2" L-80 BTC AB-Mod pin down G. 4-1/2" 12.6# L-80 BTC AB-Mod tubing to surface F. 4-1/2" Camco 'DB' landing nipple with 3.875" ID No-Go profile set at +/-500' MD E. 4-1/2" 12.6# L-80 AB-Mod tubing to 'DB' landing nipple w/ 4-1/2" x 1" Camco 'KBG-2' mandrels w/DV's, spaced out as follows: GLM# MD TVD 2 TBD TBD 3 TBD TBD 4 TBD TBD 5 TBD TBD 6 TBD TBD Note: Each GLM should have 6' L-80 handling pups installed on top and bottom. D. 4-1/2" x 1" Camco 'KBG-2' mandrel w/DCR Dump Kill Valve (3000 psi casing to tubing shear). 6" L-80 handling pups installed on top and bottom of mandrel. C. I joint 4-i/2" 12.6# L-80 BTC AB-Mod Tubing B. 4-1/2" Camco 'DB' landing nipple with 31812" ID and No-Go profile A. Baker 4-1/2" seal assembly w/10' of seals and special Iocator to locate in liner tie back sleeve Liner Top Baker 12' Tieback Extension with 4.75" ID. Baker 4-1/2" x 7'! 'ZXP' Liner Top Isolation Packer. Baker 4-1/2" x 7" 'HMC' Hydraulic Liner Hanger with 4-1/2" BTC ABMod pin down. Solid Liner 4-1/2" 12.6# L-80 BTC AB-Mod from Hydraulic Stage Tool to Liner Hanger." C4-Sand 12,136'- 12,162' Al-Sand 12.162'- 12,166' 7", 26#, L-80 casing @ 12,391' MD Cement Weatherford Hydraulic Stage Tool w/4-1/2" BTC AB-Mod Box x Pin. 8' Handling Pup Joint 4,1/2" 12.6# L-80 BTC Box x Pin. Baker CTC Payzone Packer (ECP) 4-1/2" x 20' w/4-1/2" BTC AB-Mod Box x Pin. 3' Handling Pup Joint 4-1/2" 12.6# L;80 BTC Box x Pin. Weatherford Landing Collar w/4-1/2" BTC Box x Pin. Slotted Liner 4-1/2" 12.6 # L-80 BTC AB-Mod to the landing collar (2" x 1/4" slots @ 16 slots / ft). 1-Joint blank pipe 4-1/2" 12.6# L-80 BTC AB-Mod. Baker 'V' Set guide shoe w/4-1/2" BTC Box. 1 C4/A Sand TD @ +/- 16,682' Future C4 Sand Perfs BDN 4/8/99 REDRILL PLAN SUMMARY~'' Well 3H-25 A Type of well (producer/injector): Surface Location: Tie-In Location: Top of C4: Target 1: Target 2: Target 3: Target 4: TD: Producer 1142' FSL, 2292' FWL, SEC 03, T12N, R08E, UM 1492' FNL, 159' FWL, SEC 03, T12N, R08E, UM 1481' FNL, 162' FWL, SEC 03, T12N, R08E, UM 1196' FNL, 257' FWL, SEC 03, T12N, R08E, UM 780' FNL, 397' FWL, SEC 03, T12N, R08E, UM 247' FSL, 1785' FWL, SEC 33, T13N, R08E, UM 406' FSL, 1844' FWL, SEC 33, T13N, R08E, UM MD: TVD: Rig: Estimated Start Date: ~ Operation Days to Complete: 16,682' 6,013' Nordic Rig 3 5/18/99 2O Drill Fluids Pro_~ram: Density =V YP Viscosity Initial Gel 10 Minute Gel APl Filtrate pH % Solids Mill to Weight Up 10.0 10-13 25-30 40-55 7-11 9-16 <4 9.0-9.5 11-12 Weight Up to Swap Point 10.5 14-20 15-25 40-55 7-11 9-16 <4 8.5-9.0 12-13 Swap Point to TD (Baradriln) 10.5 16-22 22-38 40-55 6-10 8-14 ' <4 8,5-9,0 8-9 Drilling Fluid System: Tandem Geolograph/Swaco Shale Shakers Mud Cleaner Degassers Pit Volume Totalizer (Visual and Audio Alarm) Trip Tank Fluid Flow Sensor Fluid Agitators Notes: Drilling fluid practices will be in accordance with the appropriate regulations stated in 20 AAC 25.033. Casinq/Tubinq Program: Hole size Csq/Tbq Lenqth Top (MD/TVD) Btm (MD/TVD) 6-118" Liner( 4-1/2", 12.6#, L-80, BTC Mod Tubing 4-1/2", 12.6#, L-80, BTC Mod 5,834' 10,850' / 5,249' 16,682' / 6,013' 10,811' 37'/37' 10,850' / 5,249' Cement Calculations: Casing to be cemented: 4-1/2" in 6-1/8" open hole Volume = 109 bbls, Class G Cement Based on: Open hole volume + 52%, 150' liner lap, and 150' of cement above liner top. Well Control: Well control equipment consisting of 5000 psi working pressure pipe rams, blind rams, and annular preventer will be installed. Maximum anticipated surface pressure is estimated at 2649 psi and is calculated using a gas column to surface with a maximum expected formation pressure in the Kuparuk of 3300 psi and a gas gradient of 0.11 psi/ft. Therefore, ARCO Alaska, Inc. will test the BOP equipment to 3500 psi. See attached BOPE schematic. Drilling Hazards: Lost Circulation: Overpressured Intervals: Other Hazards: The suspect lost circulation zones throughout the Kuparuk field are the K-10 and K-5 intervals. The sidetrack 3H-25 A, will kick off out of the 7" casing below both the K-10 and K-5 intervals. It is uncertain if adequate cement exists behind 7" casing at the, planned kick-off window. If the Formation Integrity Test shows that the K-10 and K,5 intervals are not isolated and will not hold the desired equivalent mud weight, a cement squeeze at the window could be performed to help isolate these intervals. The kick-off point 'in 3H-25 A is below any zones which would be of pressure concern prior to weighting up for the Kuparuk interval. None Directional: KOP: Max hOle angle: CloSe approach: 11,012' MD / 5,298' TVD 95° (in sidetrack portion) No Hazards 70° (in original portion) Lo~c~in~ Program: Open Hole Logs:' Cased Hole Logs: GR / Resistivity None Notes: All drill solids generated from the 3H-25 'A sidetrack will be hauled to CC2A in Prudhoe Bay for grind and inject. Incidental fluids developed from drilling operations will be hauled to the nearest permitted disposal well. KRU 3H-25 A GENERAL SIDETRACK PROCEDURE P&A WORK (Pre-Ric~): 1. RU slickline unit. RIH and dummy off all GLM's. Pressure test 7" casing to 3500 psi for 30 min (chart test). 2. RU pump truck. Perform injectivity test for upcoming CTU squeeze, by bullheading +/- 15 bbls of diesel down tubing into perforations. Record pressure and pump rate. 3. RU CTU. RIH and establish injection rate into perforations. Record breakdown pressure and rate. Note final injection rate and pressure. Tie-in CTU depth with RKB depth and flag coil. RIH with Baker 2-1/8" or 2-1/2" inflatable cement retainer on CTU and set retainer at +/-12,022" MD RKB (middle of 8' x 3-1/2" pup joint in tubing tail below Baker 'FHL' retrievable packer). 4. Squeeze 10.5 bbls of 15.8 ppg Class G cement below retainer. (3 bbl for the 3-1/2" and 7" volume below the retainer down to top of fill at 12,111' MD RKB + 7.5 bbls into perfs.) If needed, use a spotting valve placed immediately above the retainer to displace the cement down coil to desired distance above top of retainer. Close valve and pump cement squeeze below retainer into perfs. Unsting from retainer and circulate any excess cement from well bore. Leave well shut-in with initial tubing pressure on wellhead. RDMO CTU. 5. Bleed annulus pressure to 0 Psi. Pressure test tubing above inflatable retainer to 2500 psi for 30 min. Slowly bleed tubing pressure to 0 psi and monitor pressure for build-up. 6. RU slickline unit. RIH and pull 1-1/2" DV from bottom GLM at 11,947' MD RKB, leaving an open pocket. 7. RU E-line unit. RIH and cut tubing at +/-11,975' MD RKB (middle of 31' x 3-1/2" joint between bottom GLM and Baker PBR expansion joint). 8. Remove well house and scaffolding. WORKOVER RIG WORK: 1. MIRU Nordic 3. Lay hard-line to tree. 2. Verify well is dead. Displace Well to 10.0 ppg mud by circulating through tubing cut at 11,947' MD. 3. Set BPV. ND tree. NU and test BOPE. 4. Screw in landing joint. Pull tubing hanger to rig floor. POOH laying down all tubing and jewelry. 5. PU 7" Casing Scrapper on DP and run through Packer setting depth. . PU Baker 7" Torque MaSter Whipstock, MWD, Etc and RIH. Orient and set whipstock w/MWD. Shear off whipstock and test wellbore to 3500 psi, testing packer and cement plug to ensure isolation from perforations. Circulate well to. milling fluid, and mill window in 7" casing. POOH and LD milling assembly. 7. RIH w/6-1/8" bit, MWD / LWD and steerable drilling assembly. Slide out window, perform FIT test, kick-off well, and directionally drill, as per directional plan, to the base of the Al'Sand at +/- 15,000' MD. Note: Mud sh'ould be weighted up +/- 200' MD above estimated top of Kuparuk. 8. POOH and lay down MWD/i' , D and steerable drilling assembly. . 9. RIH to TD and displace well with clean Drill-In Fluid. 10. POOH and Pick-up MWD / LWD and steerable drilling assembly. 11. RIH and directionally (horizontal) drill from +/- 15,000' MD to TD at +/- 16,682' MD. 12. Displace well bore with clean Drill-In Fluid and POQH. 13. RIH with 4-1/2" Slotted / Blank Liner to TD (150' overlap above top of window) 14. Inflate ECP and cement liner in place. Set liner hanger and liner top packer. Circulate out excess cement and POOH. 11. Pressure test casing and liner lap to 3500 psi for 30 min (Chart Test for State). 12. RIH w/completion assembly and sting into polished bore receptacle at top of liner. Space out and land tubing hanger. Test tubing and annulus. 13. ND BOPE. NU and test tree. Displace well with seawater and freeze protect well with diesel. RDMO Nordic. 14. Clean out well to PBTD w/coiled tubing. Lower Limit: 18 days Expected Case: 20 days Upper Limit: 25 days No problems. Difficulties milling window, drilling new hole or running completion. MAC 4/2O/99 Created bY: Andrews For: NO~ I~te potted: 21-Apt-1999 F. ot Rel~ere-ce [~ 2~ VernOn ~12~ C~di~t~ ore ;n f~ r~ ~o1 ~25~ I 3800- 4000 4200 4400 4600 4800 5000 5200 5400 5600 I 5800 6000, 6200 6400 TIE-IN ANGLE 68.40 DE(; 6600 , , , , BO0 6O0 400 8.00 AZIMUTH ~1479.74' (TO LANDING PT) ***Plane of Proposal*** HEZ TANGENT ANGLE 55.00 TANGENT ANGLE 87.67 DEC ARCO AlaSka, Inc. J Sfru~re: Pod 3H Well: 25A Field: Kuporuk River Unfl lo~"~ilon: North Point MD Tie-In Survey 10997.70 Top of Window / Inte ~' 10998.00 KOP / Bose of Whlpst ~' 11010,00 Mill Bury Depth 11027.00 EOC / Begin HRZ Tong ~ 11631,57 TOP HRZ Type Shales 11637.47 TOP HRZ 11724,64 Begin Build /'Bose H ~ 11914.68 End of Build 12244.76 K-1 Marker / Top L. ]' 12738.83 Begin Drop/Turn to T ~' 14102.75 Top Kuporuk D 14580.75 Top C4 14674.43 3H-25A T1 / EOC / La ~ 14686.43 fop A1 14829,84 Begin Build 14861,08 5H-25A T2 / Deepest ~ 14989.52 :OC 15056.00 'ap A1 15183.80 Begin Drop 15529.43 3H-25A T3 / Hor'z Pt ~' 15429.42 5H-25AT4 /Top A1 / ~ 16508.19 :OC 16657,72 ~H-25A T5 / TD 16682.10 PR i i i i i i i 200 ' 0 200 400 OFILE COMMENT Inc Dir TVD 88.41 285.12 5293.10 68.40 285.12 5295.22 69.70 286.50 5297.51 71.55 288.44 5505.15 55,00 317.00 5578.62 55.00 ,517.00 5582.00 55,00 ,517,00 5632,00 55.00 ,517.00 5741,00 87.87 320.20 5844.67 87.87 320.20 5863.00 87,87 `520,20 5913.60 81.17 7.79 5962.00 80,44 17,25 5977.00 80,37 18.47 5979,00 80.37 18.47 600.3,00 80.37 18.47 6008,23 90,00 18.47 6019.00 94,99 18.51 6016,11 94.99 18.51 6005.00 94.99 18.51 5992.35 90.00 18.14 5988.00 90,00 18,14 5988.00 75.46 21.66 6006.88 75,46 21,66 6013.00 DATA North 2367.16 2367.25 2,370.28 2`575.10 2653.39 2656.92 2709.14 2822.99 3055.04 34`54.38 4481.59 4925.11 5015,28 5026,54 5160.65 5189.86 5311.12 5374,09 5494.82 5652.40 5727.19 6752.37 6891.47 6915.40 East -8549.06 -8549.53 -8560,11 -8575,40 -g026,83 -9030,12 -9078.82 -9184,98 -9388,41 -9704,43 -10576.81 -10705.21 -10685,19 -10681,56 -10636,78 -10627,02 -10586,53 -10565.47 -10525.06 -10479.00 -10447.60 -10111,79 -10061,53 -10052.82 LANDING ANGLE TARGET ANGLE 80.37 DEG 90.00 DEO i i i ! i i ! i i i ii i iI i i i 600 800 1000 1200 1400 1600 1 BO0 2000 2200 240{3 Verfical Secfion (feet) -> Azimufh 18.00 with reference 0.00 S, 0.00 Ir from slot #25A i i i i i i i 2600 2800 5000 5200 V. Sect -390.50 -390,52 -390,95 -391,0g -265,92 -26,5,58 -228,96 -153.49 4.34 267.46 993,83 1375.97 1467.91 1479,74 1621.13 1651,92 1779,76 1846.15 197`5.46 2118,54 2218.40 5297,17 3444,99 3468.54 Deg/lOC O.OC 3,39 15.28 15.28 5.00 O.OO 0.00 0.00 O. 0,00 10.00 10.00 10.00 0,00 0.00 7,50 7,5O 0.00 0,00 5.00 0,00 10.00 0.00 %. i i i i ! l 3400 3600 5800 ARCO Alaska, Inc. / Coereeete. are fn I.e~ r.lefe-,ce .lot 12~ I ~eld: Ku~mk ~ Un. L~lon: NoHh SIo~, ~kaI '::~ ' ~ ~ ~ <- Wosf (foot) 14000 1~600 15200 128~ 124~ 120~ 11~ 11'2~ 10~ 1~00 1~0 9~0 9200 ~00 ~00 8000 7600 7200 6800 6400 6000 5600 5200 4800 4400 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 7~0 T~G~ 5 - TD' 406' FSL, 1844' ~L SEC. 55, T15N, RBE TARG~ 4 - BEGIN DROP / T5 /TD 245' FSL, 1785' ~L SEC. 55, T15N, R8E T4 / Top A1 / Begin Drop ~00 TARGET 5 - HOR'Z ~: 780' FNL, 597' ~L SEC. 5, T12N, RBE ~H-2~ T5 / Hor'z Begin Drop 5600 A1 T~GET 2 DEEPEST ~: lOC - ?5A T2 / Deepest Pt 1196' FWNL, 257' ~L Build SEC. 5, T12N, R8E T1 / EOC / Londing Pt T~GET I - ~NDING ~: C4 1481' FNL, 162' ~L D SEC. 5, T12N, R8E TOP C4: 1492' FNL, 159' ~L Beg~n Drop~urn to Torget SEC. 3, T12N, RBE orker / Top L. Kolub~k 5200 ~End of Build .~ Begin Build / Bose HRZ / Top U. Kolubik ~ ~P HRZ 2800 ~~ Mill Bury.Depth , ~K~P / Bos~ qf WNRs~ock [oFe, _ . 2400 ~lle-ln ~u~ey I I I 1142' FSL, 2~ ~L I [ ~EC. 3, T~=U,,SE J 7200 680L 5200 4800 4400 16O0 Created by: Andrews For: NOEL1 Dots ~: 21-N~r-19g9 J IARCO Alaska, Ino.t Sir'u~'ur~: Pod 5H Will: 2,~,l~ ] iqeid: Kuporuk Rl~r Unit Loeaflon: North S~ope, AlaskaI <- West (feet) 12800 12400 12000 11600 11200 10800 10400 10000 9600 9200 8800 8400 8000 7600 7200 6800 6400 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 8000 7600 7200 68OO 6400 6000 5600 5200 I 4800 -Ii ~_ 4400 '~ 4000 0 Z 5600 5200 2800 2400 2000 1600 1200 6000 T.D. & Target - 6013.00 Tvd, 6913.40 N, 10052.82 W Target - 5988,00 Tvd, 6752,37 N, 10111.79 W et - 5988.00 Tvd, 5727.19 N, 10447.60 W Target - 6019.00 Tvd, 5311.12 N, 10586.53 W 6000 Target - 5979.00 Tvd, 5026.54 N, 10681.56 W 6100 5900 5700 5500 5400 5300 5200 5100 5000 4900 -8000 -- -7600 -- - 7200 -- -6800 -6400 -6000 5300 5200 5100 6100 5000 5800 4900 48OO 4700 5800 5700 5600 5500 5400 5500 5300 5300 4600 4500 5100 4400 4300 4900 4200 4700 5600 5200 4800 I Z 0 4400 4000 --4- 3600 2OOO 1600 1200 800 i i i i i i i i i i i i i i i i i i i i r I I i i i i i i i i 12800 12400 12000 11600 11200 10800 10400 10000 9600 9200 8800 8400 8000 7600 7200 6800 6400 <- West (feet) 800 2400 28OO 3200 Created by:. Andrews For: NOEL D~te ~: 21-,q)~-l~g9 : 520 330 Sfr~ofl~re: Pad 3H Well: 25A Reid: Kuporuk River Unlt Looeflon: Nor+h Slope~ s u TRUE NORTH ~oo, 0 0 10 340 ~oo 13300 2O 30 4O 310 50 300 6O 290 7O 280 8O 270 90 260 100 25O 110 240 23O 130 120 220 210 2 O0 190 180 170 160 Normal Plane Travelling Cylinder - Feet All depths shown ore Measured depths on Reference Wel 150 140 ARCO Alaska, Inc. Pad3H 25A slot #25A Kuparuk River Unit North Slope, Alaska PROPOSAL L I ST I NG INCLUDING POSITION UNCERTAINTIES by Baker Hughes INTEQ Your ref : 25A Version #12A Our ref: prop3376 License : Date printed : 21-Apr-99 Date created : 25-Mar-99 Last revised : 21-Apr-99 Field is centred on n70 16 18.576,w150 5 56.536 Structureis centred on n70 24 56.740,w150 0 47.688 Slot location is n70 24 44.742,w150 0 39.451 Slot Grid coordinates are N 6000437.105, E 498654.311 Slot local coordinates are 1220.00 S 281.00 E ProjeCtion type: alaska - Zone 4 Spheroid: Clarke - 1866 Reference North is True North ARCO Alaska, Inc. Pad 3H.25A Kuparuk River Unit,North Slope, A1 Measured Inclin. Azimuth Depth Degrees Degrees True Vert Depth 10997.70 68.41 285.12 5293.10 10998.00 68.40 285.12 5293.22 11000.00 68.62 285.35 5293.95 11010.00 69.70 286.50 5297.51 11027.00 71.55 288.44 5303.15 11100.00 69.28 291.48 5327.62 11200.00 66.26 295.78 5365.46 11300.00 63.37 300.29 5408.03 11400.00 60.63 305.03 5454.99 11500.00 58.06 310.01 5506.00 11600.00 55.70 315.28 5560.67 11631.57 55.00 317.00 5578.62 11637.47 55.00 317.00 5582.00 11724.64 55.00 317.00 5632.00 11914.68 55.00 317.00 5741.00 12000.00 63.49 317.97 5784.59 12100.00 73.45 318.95 5821.24 12200.00 83.41 319.83 5841.27 12244.76 87.87 320.20 5844.67 12500.00 87.87 320.20 5854.14 12738.83 87.87 320.20 5863.00 13000.00 87.87 320.20 5872.69 13500.00 87.87 320.20 5891.24 14000.00 87.87 320.20 5909.79 14102.75 87.87 320~20 5913.60 14200.00 86.22 329.80 5918.62 14300.00 84.63 339.71 5926.61 14400.00 83.21 349.66 5937.23 14500.00 81.98 359.67 5950.15 14580.75 81.17 7.79 5962.00 aska 14600.00 81.00 9.73 5964.98 14674.43 80.44 17.25 5977.00 14686.43 80.37 18.47 5979.00 14686.48 80.37 18.47 5979.01 14829.84 80.37 18.47 6003.00 RECTANGULAR COORDINATES 2367.16 N 8549.06 2367.23 N 8549.33 2367.72 N 8551.12 2370.28 N 8560.11 2375.10 N 8575.40 2398.56 N 8640.04 2435.61 N 8724.83 2478.09 N 8804.69 2525.67 N 8879.01 2577.99 N 8947.23 2634.66 N 9008.83 2653.39 N 9026.83 2656.92 N 9030.12 2709.14 N 9078.82 2822.99 N 9184.98 2877.01N 9234.47 2946.56 N 9296~05 3020.85 N 9359.74 3055.04 N 9388.41 3251.01N 9551.66 3434.38 N 9704.43 3634.91N 9871.47 4018.81 N 10191.28 4402.70 N 10511.09 4481.59 N 10576.81 4561.05 N 10632.46 4651.09 N 10674.93 4746.87 N 10701.17 4845.47 N 10710.39 4925.11 N 10705.21 4943.91N 10702.31 5015.28 N 10685.19 5026.54 N 10681.56 5026.59N 10681.55 5160.65 N 10636.78 14861.08 80.37 18.47 6008.23 5189.86'N 14900.00 83.29 18.47 6013.76 5226.40 N 14989.52 90.00 18.47 6019.00 5311.12 N 15000.00 90.79 18.47 6018.93 5321.06 N 15056.00 .94.99 18.51 6016.11 5374.09 N 15183.80 94.99 18',51 6005.00 5494.82 N 15329.43 94.99 18.51 5992.35 5632.40 N 15400.00 91.47 18.25 5988.38 5699.25 N 15429.42 90.00 18.14 . 5988.00 5727.19 N 15500.00 90.00 18.14 5988.00 5794.27 N PROPOSAL LISTING Page 1 Your ref : 25A Version #12A Last revised : 21-Apr-99 Dogleg Deg/lOOft 0.00 3.39 15.28 15.28 15.28 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0.00 0.00 0.00 10. O0 10.00 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 Vert Sect -390.50 Tie-In Survey -390.52 Top of Window / Interpolated Point -390.61 -390.95 KOP / Base of Whipstock Face -391.09 Mill Bury Depth -388.76 -379.72 -363.99 -341.71 -313.03 10.00 10. O0 10.00 10.00 10.00 W 10.00 W 10.00 W 10.00 W 7.50 W 0.00 10627.02 W 0.00 10614.82 W 7.50 10586.53 W 7.50 10583.21 W 7.50 10565.47 W 7.50 10525.06 W 0.00 10479.00 W 0.00 10456.79 W 5.00 10447.60 W 5.00 10425.63 W 0.00 -278.17 -265.92 EOC / Begin HRZ Tangent -263.58 TOP HRZ Type Shales -228.96TOP HRZ -153.49 Begin Build / Base HRZ / Top U. Kalubik -117.41 -70.29 -19.32 4.34 End of Build 140.27 267.46 K~i Marker / Top L. KalUbik 406.55' 672.83 939.11 993.83 Begin Drop/Turn to Target 1052.21 1124.72 1207.70 1298.62 1375.97 Top Kuparuk D 1394.74 1467.91 Top C4 ' 1479.74 3H-25A T1 / EOC / Landing Pt 1479.79 1621.13Top A1 1651.92 Begin Build 1690.44 1779.76 3H-25A T2 / DeePest Pt 1790.23 1846.15 EOC 1973.46 Top A1 2118.54 Begin Drop 2188.98 2218.40 3H-25A T3 / Hor'z Pt 2288.98 16000.00 90.00 18.14 5988.00 6269.42 N 10269.99 W 0.00 2788.97 16500.00 90.00 18.14 5988.00 6744.58 N 10114.34 W 0.00 3288.97 16508.19 90.00 18.14 5988.00 6752.37 N 10111.79 W 0.00 329717 3H-25A T4 ! Top A1 / Begin Drop 16600.00 81.07 20.27 5995.14 6838.71N 10081.73 W 10.00 3388.58 16641.40 77.04 21.26 6003.00 6876.71 N 10067.33 W 10.00 3429.17 All data is in feet unless otherwise stated. Coordinates from slot #25A and TVD from RKB (NORDIC III) (68.00 Ft above mean sea level).. Bottomhole distance is 12200.59 on azimuth 304.52 degrees from wellhead. Total Dogleg for wellpath is 160.62 degrees. Vertical section is from S 0.00 W 0.00 on azimuth 18.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 3H,25A Kuparuk River Unit,North Slope, Alaska Measured Inclin. Azimuth True Vert R E C T A N G U L A R Depth Degrees Degrees Depth C 0 0 R D I N A T E S PROPOSAL LISTING Page 2 Your ref : 25A Version #12A Last revised : 21-Apr-99 Dogleg Vert Deg/lOOft Sect 16657.72 75.46 21.66 6006.88 6891.47 N 10061.53 W 10.00 3444.99 EOC 16682.10 75.46 21.66 6013.00 6913.40 N 10052.82 W 0.00 3468.54 3H-25A T5 / TD All data is in feet unless otherwise stated. Coordinates from slot#25A and TVD from RKB (NORDIC III) (68.00 Ft above mean sea level). Bottom hole distance is 12200.59 on azimuth 304,52 degrees from wellhead. Total Dogleg for wellpath is 160.62 degrees. Vertical section is from S 0.00 W 0.00 on azimuth 18.00 degrees. Calculation uses the minimum curvature method. Presented by Baker HughesINTEQ ARCO Alaska. Inc. Pad 3H.25A Kuparuk River Unit. North Slope. Alaska PROPOSAL LISTING Page 3 Your ref : 25A Version #12A Last revised : 21-Apr-99 Comments in wellpath MD TVD Rectangular Coords. Comment 10997.70 5293.10 10998.00 5293.22 11010.00 5297.51 11027.00 5303.15 11631.57 5578.62 11637.47 5582.00 11724.64 5632.00 11914.68 5741.00 12244.76 5844.67 12738.83 5863.00 14102.75 5913.60 14580.75 5962.00 14674.43 5977.00 14686.43 5979.00 14829.84 6003.00 14861.08 6008.23 14989.52 6019.00 15056.00 6016.11 15183.80 6005.00 15329.43 5992.35 15429.42 5988.00 16508.19 5988.00 16657.72 6006.88 16682.10 6013.00 2367.16 2367.23 2370.28 2375.10 2653.39 2656.92 2709.14 2822.99 3055.04 3434.38 4481.59 4925.11 5015.28 5026.54 5160.65 5189.86 5311 12 5374 09 5494 82 5632 40 5727 19 6752 37 6891 47 6913.40 N 8549.06 W Tie-In Survey N 8549.33 W Top of Window / Interpolated Point N 8560.11 W KOP / Base of Whipstock Face N 8575.40 W Mill Bury Depth N 9026.83 W EOC / Begin HRZ Tangent N 9030.12 W TOP HRZ Type Shales N 9078.82 W TOP HRZ N 9184.98 W Begin Build / Base HRZ / Top U. Kalubik N 9388.41W End of Build N 9704.43 W K-1 Marker / Top L. Kalubik N 10576.81 W Begin Drop/Turn to Target N 10705.21 W Top Kuparuk D N 10685.19 W Top C4 N 10681.56 W 3H-25A T1 / EOC / Landing Pt N 10636.78 W Top A1 N 10627.02 W Begin Build N 10586.53 W 3H-25A T2 / Deepest Pt N 10565.47 W EOC N 10525.06 W Top A1 N 10479.00 W Begin Drop N 10447.60 W 3H-25A T3 / Hor'z Pt N 10111.79 W 3H-25AT4 / Top A1 / Begin Drop N 10061.53 W EOC N 10052.82W 3H-25A T5 / TD Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised 3H-25A T1 / EOC / La 487974.910,6005465.469,0.0000 5979.00 5026.54N 10681.56W 30-Mar-99 3H-25A T2 / Deepest 488070.000,6005750.000,0.0000 6019.00 5311.12N 10586.53W 30-Mar-99 3H-25A T3 / Hor'z Pt 488209.000,6006166.000,0.0000 5988.00 5727.19N 10447.60W 12-Apr'99 3H-25A T4 / Top A1 / 488545.000,6007191.000,0.0000 5988.00 6752.37N 10111.79W 12-Apr-99 3H-25A T5 / TD 488604.000,6007352.000,0.0000 6013.00 6913.40N 10052.82W 12-APr-99 ARCO Alaska. Inc. Pad 3H,25A Kuparuk River Unit,North Slope. Alaska Measured Inclin. Azimuth True Vert R E C T A N G U L A R Depth Degrees Degrees Depth C 0 0 R D I N A T E S 10997.70 68.41 285.12 5293.10 1147.16 N 8268.06 10998.00 68.40 285.12 5293.22 1147.23 N 8268.33 11000.00 68.62 285.35 5293.95 1147.72 N 8270.12 11010.00 69.70 286.50 5297.51 1150.28 N 8279.11 11027.00 71.55 288.44 5303.15 1155.10 N 8294.40 11100.00 69.28 291.48 5327.62 1178.56 N 8359.04 11200.00 66.26 295.78 5365.46 1215.61 N 8443.83 11300.00 63.37 300.29 5408.03 1258.09 N 8523.69 11400.00 60.63 305.03 5454.99 1305.67 N 8598.01 11500.00 58.06 310.01 5506.00 1357.99 N 8666.23 11600.00 55.70 315.28 5560.67 1414.66 N 8727.83 11631.57 55.00 317.00 5578.62 1433.39 N 8745.83 11637.47 55.00 317.00 5582.00 1436.92 N 8749.12 11724.64 55.00 317.00 5632.00 1489.14 N 8797.82 11914.68 55.00 317.00 5741.00 1602.99 N 8903.98 12000.00 63.49 317.97 5784.59 12100.00 73.45 318.95 5821.24 12200.00 83.41 319.83 5841.27 12244.76 87.87 320.20 5844.67 12500.00 87.87 320.20 5854.14 1657.01N 8953.47 1726.56 N 9015.05 1800.85 N 9078.74 1835.04 N 9107.41 2031.01N 9270.66 12738.83 87.87 320.20 5863.00 13000.00 87.87 320.20 5872.69 13500.00 87.87 320.20 5891.24 14000.00 87.87 320.20 5909.79 14102.75 87.87 320.20 5913.60 PROPOSAL LISTING Page 1 Your ref : 25A Version #12A Last revised : 21-Apr-99 14200.00 86.22 329.80 5918.62 14300.00 84.63 339.71 5926.61 14400.00 83.21 349.66 5937J23 14500.00 81.98 359.67 5950.15 14580.75 81.17 7.79 5962.00 Dogleg Vert Deg/lOOft Sect 14600.00 81.00 9.73 5964.98 14674.43 80.44 17.25' 5977.00 14686.43 80.37 18.47 5979.00 14686.48 80.37 18.47 5979.01 14829.84 80.37 18.47 6003.00 W 0.00 -390.50 W 3.39 -390.52 W 15.28 -390.61 W 15.28 -390.95 W 15.28 -391.09 14861.'08 80.37 18.47 6008.23 14900.00 83.29 18.47 6013.76 14989.52 90.00 18.47 6019.00 15000.00 90.79 18.47 6018.93 15056.00 94.99 18.51 6016.11. W 5.00 -388.76 W 5.00 -379.72 W 5.00 -363.99 W 5.00 -341.71 W 5.00 -313.03 W 5.00 -278.17 W 5.00 -265.92 W 0.00 -263.58 W 0.00 -228.96 W 0.00 -153.49 Tie-In Survey Top of Window / Interpolated Point KOP / Base of Whipstock Face Mill Bury Depth EOC / Begin HRZ Tangent TOP HRZ Type Shales TOP HRZ Begin Build / Base HRZ / Top U. Kalubik W 10.00 -117.41 W 10.00 -70.29 W 10.00 -19.32 W 10.00 4.34 End of Build W 0.00 140.27 2214.38 N 9423,43 W 2414.91 N 9590.47 W 2798.81 N 9910.28 W 3182.70 N 10230.09 W 3261.59 N 10295.81 W 3341.05 N 10351.46 W 3431.09 N 10393.93 W 3526.87 N 10420.17 W 3625.47 N 10429.39 W 3705.11N 10424.21W 3723.91N 10421.31W 3795.28 N 10404.19 W 3806.54 N 10400.56 W 3806.59 N 10400.55 W 3940.65'N 10355.78 W 3969.86 N 10346.02 W 4006.40 N 10333.82 W 4091.12 N 10305.53 W 4101.06 N 10302.21W 4154.09 N 10284.47 W 15183.80 94.99 18.51. 6005.00 4274.82 N 10244.06 W 15329.43 94.99 18.51 5992.35 4412.40 N 10198.00 W 15400.00 91.47 18.25 5988.38 4479.25N 10175.79 W 15429.42 90.00 18.14 5988.00 4507.19 N 10166.60 W 15500.00 90.00 18.14 5988.00 4574.27 N 10144.63 W 16000.00 90.00 18.14 5988.00 5049.42 N 9988.99 W 16500.00 90.00 18.14 5988.00 5524.58 N 9833.34 W 16508.19 90.00 18.14 5988.00 5532.37 N 9830.79 W 16600.00 81.07 20.27 5995.14 5618.71N 9800.73 W 16641.40 77.04 21.26 6003.00 5656.71N 9786.33 W 0.00 267.46 0.00 406.55 0.00 672.83 0.00 939.11 0.00 993.83 K-1 Marker / Top L. Kalubik Begin Drop/Turn to Target 10.00 1052.21 10.00 1124.72 10.00 1207.70 10.00 1298.62 10.00 1375.97 Top Kuparuk D 10.00 1394.74 10.00 1467.91 10.00 1479.74 7.50 1479.79 0.00 1621.13 Top C4 3H-25A T1 / EOC / Landing Pt TopA1 0.00 1651.92 7.50 1690.44 7.50 1779.76 7.50 1790.23 7.50 1846.15 Begin Bui 1 d 3H-25A T2 / DeePest Pt EOC 0.00 1973.46 0.00 2118.54 5.00 2188.98 5.0O 2218.40 0.00 2288.98 Top A1 Begin Drop 3H-25A .T3 / Hor'z Pt 0,00 2788.97 0.00 3288.97 0.00 3297.17 10.00 3388.58 10.00 3429.17 3H-25A T4 / Top A1 / Begin Drop All data is in feet unless otherwise stated. Coordinates from NW Corner of Sec. 12, T12N, R8E and TVD from RKB (NORDIC III) (68.00 Ftabove mean sealevel). Bottom hole distance is 12200.59 on azimuth 304.52 degrees from wellhead. Total Dogleg for wellpath is 160.62 degrees. Vertical section is from S 1220.00 E 281.00 on azimuth 18.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 3H,25A Kuparuk River Unit,North Slope, Alaska Measured Inclin. Azimuth True Vert R E C T A N G U L A R Depth Degrees Degrees Depth C 0 0 R D I N A T E S PROPOSAL LISTING Page 2 Your ref : 25A Version #12A Last revised : 21-Apr-99 Dogleg Vert Deg/lOOft Sect 16657.72 75.46 21.66 6006.88 5671.47 N 9780.53 W 10.00 3444.99 EOC 16682.10 75.46 21.66 6013.00 5693.40 N 9771.82 W 0.00 3468.54 3H-25A T5 / TD All data is in feet unless otherwise stated. Coordinates from NW Corner of Sec. 12, T12N, R8E and TVD from RKB (NORDIC III) (68.00 Ft above mean.sea level). Bottom hole distance is 12200.59 on azimuth 304.52 degrees from wellhead. Total Dogleg for wellpath is 160.62 degrees. Vertical section is from S 1220.00 E 281.00 on azimuth 18.00 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska. Inc. Pad 3H.25A Kuparuk River Unit. North Slope. Alaska PROPOSAL LISTING Page 3 Your ref : 25A Version #12A Last revised : 21-Apr-99 Comments in wellpath MD TVD Rectangular Coords. Comment 10997.70 5293.10 1147.16 N 8268.06 W Tie-In Survey 10998.00 5293.22 1147.23 N 8268.33 W Top of Window / Interpolated Point 11010.00 5297.51 1150.28 N 8279.11W KOP / Base of Whipstock Face 11027.00 5303.15 1155.10 N 8294.40 W Mill Bury Depth 11631.57 5578.62 1433.39 N 8745.83 W EOC / Begin HRZ Tangent 11637.47 5582.00 1436.92 N 8749.12 W TOP HRZ Type Shales 11724.64 5632.00 1489.14 N 8797.82 W TOP HRZ 11914.68 5741.00 1602.99 N 8903.98 W Begin Build / Base HRZ / Top U. Kalubik 12244.76 5844.67 1835.04 N 9107.41W End of Build 12738.83 5863.00 2214.38 N 9423.43 W K-1 Marker / Top L. Kalubik 14102.75 5913.60 3261.59 N 10295.81W Begin Drop/Turn to Target 14580.75 5962.00 3705.11 N 10424.21W Top Kuparuk D 14674.43 5977.00 3795.28 N 10404.19 W Top C4 14686.43 5979.00 3806.54 N 10400.56 W 3H-25A T1 / EOC / Landing Pt 14829.84 6003.00 3940.65 N 10355.78 W Top A1 14861.08 6008.23 3969.86 N 10346.02 W Begin Build 14989.52 6019.00 4091.12 N 10305.53 W 3H-25A T2 / Deepest Pt 15056.00 6016.11 4154.09 N 10284.47 W EOC 15183.80 6005.00 4274.82 N 10244.06 W Top A1 15329.43 5992.35 4412.40 N 10198.00 W Begin Drop 15429.42 5988.00 4507.19 N 10166.60 W 3H-25A T3 / Hor'z Pt 16508.19 5988.00 5532.37 N 9830.79 W 3H-25A T4 / Top A1 / Begin Drop 16657.72 6006.88 5671.47 N 9780.53 W EOC 16682.10 6013.00 5693.40 N 9771.82 W 3H-25A T5 / TD Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular COordinates Revised 3H-25A T1 /EOC / La 487974.910,6005465.469.0.0000 5979.00 3806.54N 10400.56W 30-Mar-99 3H-25A T2 / Deepest 488070.000,6005750.000,0.0000 6019.00 4091.12N 10305.53W 30-Mar-99 3H-25A T3 / Hor'z Pt 488209.000,6006166.000,0.0000 5988.00 4507.19N 10166.60W 12-Apr-99 3H-25A T4 / Top A1 / 488545.000,6007191.000,0.0000 5988.00 5532.37N ~ 9830.79W 12-Apr-99 3H-25A T5 / TD 488604.000,6007352.000,0.0000 6013.00 5693.40N 9771.82W 12-Apr-99 ARCO Alaska. Inc. Pad 3H,25A Kuparuk River Unit. North Slope, Alaska Measured Depth Inclin Azimuth True Vert Degrees Degrees Depth 10997.70 68.41 285.12 5293.10 10998.00 68.40 285.12 5293.22 11000.00 68.62 285.35 5293.95 11010.00 69.70 286.50 5297.51 11027.00 71.55 288.44 5303.15 11100.00 69.28 291.48 5327.62 11200.00 66.26 295.78 5365.46 11300.00 63.37 300.29 5408.03 11400.00 60.63 305.03 5454.99 11500.00 58.06 310.01 5506.00 11600.00 55.70 315.28 5560.67 11631.57 55.00 317.00 5578.62 11637.47 55.00 317,00 5582.00 11724.64 55,00 317.00 5632.00 11914.68 55.00 317.00 5741.00 12000.00 63.49 317.97 5784.59 12100.00 73.45 318.95 5821,24 12200.00 83.41 319.83 5841.27 12244.76 87.87 320.20 5844.67 12500.00 87.87 320,20 5854.14 12738.83 87.87 320.20 5863.00 13000.00 87.87 320.20 5872.69 13500.00 87.87 320.20 5891.24 14000.00 87,87 320.20 5909.79 14102.75 87,87 320.20 5913.60 14200.00 86,22 329.80 5918.62 14300.00 84.63 339.71 5926.61 14400,00 83.21 349.66 5937.23 14500.00 81,98 359.67 5950,15 14580.75 81.17 7.79 5962.00 14600,00 81.00 9.73 5964,98 14674.43 80,44 17.25 5977.00 14686.43 80~37 18.47 5979,00 14686,48 80.37 18.47 5979.01 14829.84 80,37 18,47 6003,00 14861.08 14900.00 14989.52 15000.00 15056.00 15183.80 15329.43 15400.00 15429.42 15500.00 16000.00 16500.00 16508.19 16600.00 16641.40 RECTANGULAR COORDINATES PROPOSAL LISTING Page 1 Your ref : 25A Version #12A Last revised : 21-Apr-99 Dogleg Vert Deg/lOOft Sect 2367.16N 8549.06W 0.00 -390.50 2367.23N 8549.33W 3.39 -390.52 2367.72N 8551.12W 15.28 -390.61 2370.28N 8560.11W 15.28 -390.95 2375.10N 8575.40W 15.28 -391.09 2398.56N 8640.04W 2435.61N 8724.83W 2478.09N 8804.69W 2525.67N 8879.01W 2577.99N 8947.23W 2634.66N 9008.83W 2653.39N 9026.83W 2656,92N 9030.12W 2709.14N 9078,82W 2822.99N 9184.98W 2877.01N 2946.56N 3020.85N 3055.04N 3251.01N 3434.38N 3634.91N 4018~81N 4402.70N 4481.59N 5.00 -388.76 5.00 -379.72 5.00 -363.99 5,00 -341.71 5.00 -313,03 4561.05N 4651.09N 4746.87N 4845.47N 4925.11N 4943.91N 5015.28N 5026.54N 5026.59N 5160.65N 80.37 18,47 6008.23 5189.86N 83.29 18.47 6013.76 5226.40N 90.00 18.47 6019,00 5311.12N 90.79 18.47 6018.93 5321.06N 94,99 18,51 6016,11 5374,09N 94.99 182,51 6005.00 5494.82N 94.99' 18.51 5992.35 5632.40N 91.47 18.25 5988.38 5699.25N 90.00 18.14 5988.00 5727.19N 90.00 18,14 5988.00 5794.27N 90.00 18.14 5988.00 6269.42N 90.00 18.14 5988~00 6744.58N 90.00 18.14 5988.00 6752.37N 81,07 20.27 5995.14 6838.71N · 77.04 21.26 6003.00 6876.71N 5.00 -278.17 5.00 -265.92 0.00 -263.58 0.00 -228.96, 0.00 -153.49 9234.47W 10.00 -117.41 9296,05W 10,00 -70.29 9359;74W 10.00 -19.32 9388.41W 10.00 4.34 9551.66W 0.00 140.27 9704,43W 0.00 267]46 9871.47W 0.00 406.55 10191.28W 0.00 672.83 10511.09W 0,00 939.11 10576.81W 0.00 993.83 10632.46W 10.00 1052.21 10674.93W 10,00 1124.72 10701.17W 10.00 1207.70 10710.39W 10.00 1298,62 10705,21W 10.00 1375.97 10702.31W 10.00 1394.74 10685.19W 10.00 1467.91 10681.56W 10.00 1479,74 10681.55W 7.50 1479,79 10636.78W 0.00 1621.13 10627.02W 0.00 1651,92 10614.82W 7.50 1690,44 10586.53W 7.50 1779,76 10583,21W 7.50 1790,23 10565,47W 7.50 1846.15 10525.06W 0.00 1973,46 10479.00W 0.00 2118.54 10456,79W 5.00 2188.98 10447.60W 5.00 2218.40 10425.63W 0.00 2288,98 10269.99W 0.00 2788.97 10114,34W 0.00 3288,97 10111.79W 0.00 3297.17 10081.73W 10.00 3388.58 10067.33W 10,00 3429.17 GR I D COORD S Easting Northing 490106.62 6002805.89 490106.35 6002805.96 490104.56 6002806.45 490095.57 6002809,02 490080.28 6002813,83 490015.66 6002837.31 489930.89 6002874,37 489851.04 6002916,86 489776.74 6002964.46 489708.54 6003016.79 489646.96 6003073.46 489628.97 6003092.19 489625.67 6003095.72 489576.99 6.003147,95. 489470.86 6003261.81 489421,39 6003315.84 489359.83 6003385.40 489296.17 6003459.69 489267.51 6003493.88 489104.31 6003689.87 488951,60 6003873.26 488784.62 6004073.80 488464.92 6004457,73 488145.23 6004841.66 488079.53 6004920,56 488023.91 6005000.02 487981.47 6005090.06 487955.25 6005185,83 487946,05 6005284.42 487951.25 6005364.06 487954.15 6005382,85 487971.28 6005454.21 487974,91 6005465.47' 487974.93 6005465.52 488019.72 6005599.56 488029.48 6005628.76 488041.69 6005665.29 488070.00 6005750.00 488073'.32 6005759.93 488091.06 6005812,95 488131.51 6005933.66 488177.59 6006071.22 488199.81 6006138.06 488209.00 6006166.00 488230,98 6006233.06 488386.72 6006708.14 488542.45 6007183.21 488545.00 6007191.00 488575,08 6007277,33 488589.49 6007315.32 All data in feet unless otherwise stated. Calculation uses minimumcurvature method. Coordinates from slot#25A and TVD from RKB (NORDIC III) (68.00 Ft above mean sea level), Bottomhole distance is 12200.59 on azimUth 304.52 degrees from wellhead. Total Dogleg for wellpath is 160.62 degrees. Vertical section is from S 0.00 W 0.00 on azimuth 18.00 degrees, Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ 'i:' ARCO Alaska, Inc. Pad 3H,25A Kuparuk River Unit,North Slope, Alaska PROPOSAL LISTING Page 2 Your ref : 25A Version #12A Last revised : 21-Apr-99 Measured Inclin Azimuth True Vert R E C T A N G U L A R Dogleg Vert G R I D C 0 0 R D S Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOft Sect Easting Northing 16657.72 75.46 21.66 6006.88 6891.47N 10061.53W 10.00 3444.99 488595.29 6007330.08 16682.10 75.46 21.66 6013.00 6913.40N 10052.82W 0.00 3468.54 488604.00 6007352.00 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot#25A and TVD from RKB (NORDIC III) (68.00 Ft above mean sea level). Bottom hole distance is 12200.59 on azimuth 304.52 degrees from wellhead. Total Dogleg for wellpath is 160.62 degrees. Vertical section is from S 0.00 W 0.00 on azimuth 18.00 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866spheroid Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 3H,25A Kuparuk River Unit.North Slope. Alaska PROPOSAL LISTING Page 3 Your ref : 25A Version #12A Last revised : 21-Apr-99 Comments in wellpath MD TVD Rectangul ar Coords. Comment ..... ..... ................................................. 10998.00 5293.22 2367.23N 11010.00 5297.51 2370.28N 11027.00 5303.15 2375.10N 11631.57 5578.62 2653.39N 11637.47 5582.00 2656.92N 11724.64 5632.00 2709.14N 11914.68 5741.00 2822.99N 12244.76 5844.67 3055.04N 12738.83 5863.00 3434.38N 14102.75 5913.60 4481.59N 14580.75 5962.00 4925.11N 14674.43 5977.00 5015.28N 14686.43 5979.00 5026.54N 14829.84 6003.00 5160.65N 14861.08 6008.23 5189.86N 14989.52 6019.00 5311.12N 15056.00 6016,11 5374.09N 15183.80 6005.00 5494.82N 15329.43 5992.35 5632.40N 15429.42 5988.00 5727.19N 16508.19 5988.00 6752.37N 16657.72 6006.88 6891.47N 16682.10 6013.00 6913.40N 8549.33W 8560.11W 8575.40W 9026.83W 9030.12W 9078.82W 9184.98W 9388.41W 9704.43W 10576.81W 10705.21W 10685.19W 10681.56W 10636.78W 10627 02W 10586 53W 10565 47W 10525 06W 10479 OOW 10447 60W 10111.79W 10061.53W 10052.82W Top of Window / Interpolated Point KOP / Base of Whipstock Face Mill Bury Depth EOC / Begin HRZ Tangent TOP HRZ Type Shales TOP HRZ Begin Build / Base HRZ / Top U. Kalubik End of Build K-1 Marker / Top L. Kal ubik Begin Drop/Turn to Target Top Kuparuk D Top C4 3H-25A T1 / EOC / Landing Pt Top A1 Begin Build 3H-25A T2 / Deepest Pt EOC Top A1 Begin Drop 3H-25A T3 / Hor'z Pt 3H-25A T4 / Top A1 / Begin Drop EOC 3H-25A T5 / TD Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised 3H-25A T1 / EOC / La 487974.910,6005465.469,0.0000 5979.00 5026.54N 10681.56W 30-Mar-99 3H-25A T2 / Deepest 488070.000,6005750.000,0.0000 6019.00 5311.12N 10586.53W 30-Mar-99 3H-25A T3 / Hor'z Pt 488209.000,6006166.000,0.0000 5988.00 5727.19N 10447.60W 12-Apr-99 3H-25A T4 / TopA1 / 488545.000.6007191.000,0.0000 5988.00 6752.37N 10111.79W 12-Apr-99 3H-25A T5 / TD 488604.000.6007352.000,0.0000 6013.00 6913.40N 10052.82W 12-Apr-99 ARCO Alaska, Inc, Pad 3H, 25A Kuparuk River Unit,North Slope, A1 Measured Inclin, Azimuth True Vert Depth Degrees Degrees Depth 10997,70 68,41 285,12 5293,10 10998,00 68,40 285,12 5293,22 11000.00 68,62 285,35 5293,95 11010,00 69,70 286,50 5297,51 11027,00 71,55 288,44 5303,15 11100,00 69.28 291,48 5327,62 11200,00 66,26 295,78 5365,46 11300,00 63,37 300,29 5408,03 11400,00 60,63 305,03 5454.99 11500.00 58,06 310,01 5506,00 11600,00 55,70 315,28 5560,67 11631,57 55,00 317,00 5578,62 11637,47 55.00 317,00 5582,00 11724,64 55,00 317,00 5632,00 11914,68 55,00 317,00 5741,00 12000,00 63.49 317,97 5784.59 12100,00 73,45 318,95 5821,24 12200,00 83,41 319,83 5841,27 12244,76 87,87 320,20 5844,67 12500,00 87,87 320,20 5854,14 12738,83 87,87 320,20 5863,00 13000,00 87,87 320,20 5872,69 13500,00 87,87 320,20 5891,24 14000,00 87,87 320,20 5909,79 14102,75 87,87 320,20 5913,60 14200,00 86,22 329,80 5918,62 14300,00 84,63 339,71 5926,61 14400,00 83,21 349,66 5937~23 14500,00 81,98 359,67 5950,15 14580,75 81,17 7,79 5962,00 14600,00 81,00 9,73 5964,98 14674,43 80,44 17,25 · 5977,00 14686,43 80,37 18,47 5979,00 14686,48 80,37 18,47 5979,01 14829,84 80,37 18,47 6003,00 14861.08 80,37 18.47 6008,23 14900,00 83,29 18,47 6013,76 14989,52 90,00 18,47 6019,00 15000,00 90,79 18,47 6018,93 15056,00 94.99 18,51 6016,11 aska RECT COOR 2367,16 2367,23 2367,72 2370,28 2375,10 2398,56 2435,61 2478,09 2525,67 2577,99 2634,66 2653,39 2656,92 2709,14 2822,99 2877,01 2946,56 3020,85 3055,04 3251,01 3434,38 3634,91 4018,81 4402,70 4481,59 4561,05 N 4651,09 N 4746,87 N 4845,47 N 4925,11N 4943,91N 5015,28 N 5026,54 N 5026,59 N 5160,65'N ANG DIN PROPOSAL LISTING Page 1 Your ref : 25A Version #12A Last revised : 21-Apr-99 U L A R Vert Ellipse Semi Axes Minor A T E S Sect Major Minor Vert, Azi. 8549,06 W -390,50 313,59 37,26 48,67 285,27 8549,33 W -390.52 313,59 37,26 48,67 285,27 8551,12 W -390,61 313,61 37,27 48,69 285,27 8560.11 W -390.95 313,68 37,29 48.75 285.27 8575,40 W -391,09 313,82 37,33 48,86 285,27 8640,04 W -388,76 314,47 37,53 49,31 285,28 8724.83 W -379.72 315.48 37,85 49,93 285,32 8804,69 W -363,99 316,57 38,27 50,53 285,39 8879,01 W -341,71 317,69 38,83 51,11 285,47 8947,23 W -313,03 318,81 39,55 51,68 285,58 9008,83 W -278,17 319.88 40,44 52,23 285,71 9026,83W -265,92 320,22 40,75 52,40 285,76 9030,12 W -263,58 320,29 40,82 52,44 285,76 9078.82 W -228,96 321,29 41,84 52,92 285,90 9184,98 W -153,49 323,48 44,07 53,97 286,19 9234,47 W -117,41 324,66 45,37 , 54,51 286,36 9296,05 W -70,29 326,23 47,15 55,23 286,60 9359,74 W -19,32 327,95 49,15 56,01 286,87 9388,41 W 4,34 328,74 50,08 56,37 287,00 9551,66 W 140,27 333,63 55,81 58,46 287,79 9704,43 W 267,46 339,03 61,63 60,49 288,65 9871,47 W 406,55 344,93 67,99 62,70 289,58 10191.28 W 672,83 358~47 80,21 67,11 291,62 10511,09 W 939,11 374,22 91,69 71,66 293,79 10576,81 W 993,83 377,71 93,92 72,61 294,24 10632,46 W 1052,21 380,39 96,21 73,51 294,67 10674,93 W 1124,72 382,40 98,44 74,43 295,08 10701,17 W 1207,70 383,72 100,24 75,35 295,42 10710,39 W 1298,62 384,44 101,42 76,27 '295,67 10705,21 W 1375,97 384.69 101,77 77,01 295,79 10702,31 W 1394,74 384,75 101,86 77,19 295,82 10685,19 W 1467,91 384,82 101,75 77,87 295,87 10681,56 W 1479,74 384,83 101,73 77,98 295,88 10681,55 W 1479,79 384,83 101,73 77,98 295,88 10636,78 W 1621,13 384,97 101,87 79,30 295,98 5189.86 N 10627,02 W 1651,92 385.00 101,90 79,59 296,00 5226,40 N 10614,82 W 1690,44 385,04 '102,01 79,96 296,03 5311,12 N 10586,53 W 1779,76 385,13 102,36 80,81 296,10 5321,06 N 10583,21 W 1790,23 385,14 102,41 80,91 296,10 5374,09 N 10565,47 W 1846,15 385,19 102.71 81,45' 296,15 15183,80 94,99 18,51 6005,00 5494,82 N 10525,06 W 1973,46 385,32 103,79 82,68 296,25 15329,43 94,99 18,51 5992,35 5632,40 N 10479,00 W 2118,54 385,47 105,01 84,08 296,37 15400.00 91,47 18,25 5988,38 5699,25N 10456,79 W 2188,98 385,55 105,82 84,77 296,43 15429,42 90,00 18,14 5988,00 5727,19 N 10447,60 W 2218,40 385,58 106,19 85,06 296,45 15500,00 90,00 18,14 5988,00 5794,27 N 10425,63 W 2288,98 385,66 107,12 85,74 296,52 16000,00 90,00 18,14 5988,00 6269,42 N 10269,99W 2788,97 386,26 115,86 90,64 297,01 16500,00 90,00 18,14 5988,00 6744,58 N 10114,34 W 3288,97 386,91 127.70 95.59 297,57 16508,19 90,00 18,14 5988,00 6752,37 N 10111,79 W 3297,17 386,92 127,91' 95,67 297,58 16600,00 81,07 20,27 5995,14 6838,71 N 10081,73 W 3388,58 387,02 130,34 96,57 297,68 16641.40 77,04 21.26 6003,00 6876,71N 10067,33 W 3429,17 387.05 131,45 96,95 297,71 All data is in feetunless otherwise stated, Coordinates from slot #25A and TVD from RKB (NORDIC III) (68,00 Ft above mean sea level), Bottom hole distance is 12200,59 on azimuth 304,52 degrees from wellhead. Vertical section is from S 0,00 W 0,00 on azimuth 18,00 degrees, Calculation uses the minimum.curvature method, Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 3H,25A Kuparuk River Unit.North Slope, Alaska PROPOSAL LISTING Page 2 Your ref : 25A Version #12A Last revised : 21-Apr-99 Measured Inclin. Azimuth True Vert Depth Degrees Degrees Depth RECTANGULAR COORDINATES Vert Ellipse Semi Axes Minor Sect Major Minor Vert, Azi. 16657.72 75.46 21.66 6006.88 6891.47 N 10061.53 W 3444.99 387.07 131.89 97.11 297.73 16682.10 75.46 21.66 6013.00 6913.40 N 10052.82 W 3468.54 387.09 132.55 97.33 297.75 POSITION UNCERTAINTY SUMMARY Depth Position Uncertainty From To Survey Tool Error Model Major Minor Vert. 0 10998 ARCO (H.A. Gyro) User specified 313.59 37.26 48.67. 10998 16682 ARCO (H.A. Mag) User specified 387.09 132.55 97.33 1. Ellipse dimensions are half axis. 2. Casing dimensions are not included. 3. Ellipses are calculated on 2.58 standard deviations. 4. Uncertainty calculations start at drill depth zero. 5, Surface position uncertainty is not included. 6, Where twosurveys are tied together the errOrs of one are considered to have a systematic relationship to the corresponding errors of the other. 7. Detailed description of the INTEQ error models can be found in the Ec*Trak manual, All data is in feet unless otherwise stated. Coordinates from slot #25A and TVD from RKB (NORDIC III) (68.00 Ft above mean sea level). Bottom hole distance is 12200.59 on azimuth 304.52 degrees from wellhead. Vertical section is from S 0.00 W 0.00 on azimuth 18,00 degrees., Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ARCO Alaska, Inc. Pad 3H,25A Kuparuk River Unit.North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 25A Version #12A Last revised : 21-Apr-99 Comments in wellpath MD TVD Rectangular Coords. Comment 10997.70 5293.10 2367.16 N 8549.06 W Tie-In Survey 10998.00 5293.22 2367.23 N 8549.33 W Top of Window / Interpolated Point 11010.00 5297.51 2370.28 N 8560.11W KOP / Base of Whipstock Face 11027.00 5303.15 2375.10 N 8575.40 W Mill Bury Depth 11631.57 5578.62 2653.39 N 9026.83 W EOC / Begin HRZ Tangent 11637.47 5582.00 2656.92 N 9030.12 W TOP HRZ Type Shales 11724.64 5632.00 2709.14 N 9078.82 W TOP HRZ 11914.68 5741.00 2822.99 N 9184.98 W Begin Build / Base HRZ / Top U. Kalubik 12244.76 5844.67 3055.04 N 9388.41 W End of Build 12738.83 5863.00 3434.38 N 9704.43 W K-1 Marker / Top L. Kalubik 14102.75 5913.60 4481.59 N 10576.81 W Begin Drop/Turn to Target 14580.75 5962.00 4925.11N 10705.21 W Top Kuparuk D 14674.43 5977.00 5015.28 N 10685.19 W Top C4 14686.43 5979.00 5026.54 N 10681.56 W 3H-25A T1 / EOC / Landing Pt 14829.84 6003.00 5160.65 N 10636.78 W Top A1 14861.08 6008.23 5189.86 N 10627.02 W Begin Build 14989.52 6019.00 5311.12 N 10586.53 W 3H-25AT2 / Deepest Pt 15056.00 6016.11 5374.09 N 10565.47 W EOC 15183.80 6005.00 5494.82 N 10525.06 W Top A1 15329.43 5992.35 5632.40 N 10479.00 W Begin Drop 15429.42 5988.00 5727.19 N 10447.60 W 3H-25A T3 / Hor'z Pt 16508.19 5988.00 6752.37 N 10111.79 W 3H-25A T4 / Top A1 / Begin Drop 16657.72 6006.88 6891.47 N 10061.53 W EOC 16682.10 6013.00 6913.40 N 10052.82 W 3H-25A T5 / TD Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised 3H-25A T1 /EOC / La 487974.910,6005465.469,0.0000 5979.00 5026.54N 10681.56W 30-Mar-99 3H-25A T2 / Deepest 488070~000,6005750.000,0.0000 6019.00 5311.12N 10586.53W 30-Mar-99 3H-25A T3 / Hor'z Pt 488209.000,6006166.000,0.0000 5988.00 5727.19N 10447.60W 12-Apr-99 3H-25A T4 / Top A1 / 488545.000,6007191.000,0.0000 5988.00 6752.37N 10111.79W 12-Apr-99 3H-25A T5 / TD 488604.000,6007352.000,0.0000 6013.00 6913.40N 10052.82W 12rApr-99 ARCO Alaska, Inc. Pad 3H 25A slot #25A Kuparuk River Unit North Slope, Alaska SUMMARY CLEARANCE REPORT by Baker Hughes INTEQ Your ref : 25A Version #12A Our ref : prop3376 License : Date printed : 21-Apr-99 Date created : 25-Mar-99 Last revised : 21-Apr-99 Field is centred on n70 16 18.576,w150 5 56.536 Structure is centred on n70 24 56.740,w150 0 47.688 Slot location is n70 24 44.742,w150 0 39.451 Slot Grid coordinates are N 6000437.105, E 498654.311 Slot local coordinates are 1220..00 S 281.00 E Projection type: alaska, Zone 4, Spheroid: Clarke - 1866 Reference North is True North Object wellpath PMSS <6133 - 7755'>,,13A,Pad 3H PGMS <0-7370'>,,13,Pad 3H PGMS <0-9360'>,,23,Pad 3H PMSS <7640 - 9875'>,,23A,Pad 3H PMSS <549 - 14940'>,,28,Pad 3H PMSS <5706 - 8867'>,,28A,Pad 3H PMSS <7395 - 12575'>,,28A,Pad 3H PMSS <1743-6660'>,,26,Pad 3H PGMS <0-8460'>,,15,Pad 3H PGMS <O-8095'>,,4,Pad 3H PGMS <0-7987'>,,6,Pad 3H PGMS <O-7750'>,,11,Pad 3H PGMS <O-7155'>,,5,.Pad 3H PMSS <461-12044'>,,24,Pad 3H PGMS <O-10730'>,,31,Pad 3H PGMS <O-8650'>,,19,Pad 3H PGMS <O-10293'>,,18,Pad 3H PGMS <O-8167'>,,1,Pad 3H PGMS <O-9555'>,,3,Pad 3H PGMS <O-8620'>,,7,Pad 3H PGMS <0-6881'>,,8,Pad 3H PGMS <O-7310'>,,9,Pad 3H PGMS<O-8350'>;,2,Pad 3H PGMS <O-6785'>,,10,Pad 3H PGMS <0-9770'>,,16,Pad 3H PGMS <O-8614'>,,17,Pad 3H PGMS <O-8250'>,,14,Pad 3H Closest approach with 3- Last revised Distance 7-Jan-99 7332.1 13-Nov-91 6945.7 7-Nov-96 4910.7 7-Jan-99 5265.4 18-Feb-96 506.9 28-Feb-96 3032.7 28-Feb-96 2065.9 7-Jan-99 8895.9 13-Nov-91 4174.2 13-Nov-'91 9947.1 13-Nov-91 4922.7 13-Nov-91 9959.0 13-Nov-91 8536.8 14-Feb-96 7104.2 14-Feb-96 8095.6 14-Feb-96 7532.6 13-Nov-91 1559.3 13-Nov-91 9123.0 13-Nov-91 9928.7 13-Nov-91 6780.5 13-Nov-91 6713.3 13-Nov-91 9734.2 13-Nov-91 9907.0 13-Nov-91 9135.2 13-Nov-91 3065.8 13-Nov-91 9357.8 13,Nov-91 9640.1 D Minimum Distance method M,D, 10997.7 10997 7 10997 7 10997 7 14167 6 10997 7 16035 0 10997 7 10997 7 10997.7 10997.7 10997.7 10997.7 16682.1 10997.7 10997.7 10997.7 10997.7 10997.7 10997.7 10997.7 10997.7 10997.7 10997.7 10997.7 10997.7 10997.7. Diverging from M.D. 16440.0 15382.4 16682.1 16682.1 14167.6 10997.7 16035J0 10997.7 10997.7 14742.0 10997.7 16671.0 10997.7 16682.1 16682.1 16682.1 10997.7 10997.7 10997.7 10997.7 10997.7 16452.0 10997.7 15432.0 10997.7 16682.1 15585.0 PGMS <0-7298'>,,12.P~ PGMS <0-10234'>.,22,Paa ~H PGMS <0-11346'>,.21,Pad 3H PMSS <1506-2076'>,,20.Pad 3H PMSS <1622-4449'>.,20,Pad 3H PGMS <0-9050'>..20,Pad 3H PMSS <1506-3878'>,.20,Pad 3H PGMS <O-12410'>,,25,Pad 3H 13-Nov-91 13-Nov-91 13-Nov-91 13-Nov-91 13-Nov-91 13-Nov-91 13-Nov-91 17oFeb-99 9169.1 10997.~ 9240.5 10997.7 9638.3 10997.7 9646.6 10997.7 9660.1 10997.7 9662.3 10997.7 9637.5 10997.7 0.0 10998.0 16682.1 16682.1 16682.1 10997.7 16443.0 15453.0 15483.0 10998.0 7-1/16" 5000 PSI BOP STACK S BLIND RAM~ l MUD CROSS 4 [,, 3 PIPE RAM 9, 11. 12. 13. 14, 15. 1.11" - 3000 PSI CASING HEAD 2, 11"; 3000 PSI x 7-1/16" 5000 PSI TUBING HEAD 3.7-1/16" - 5000PSI SINGLE GATE W/PIPE RAMS 4.7-1/16" - 5000 PSI DRLG SPOOL W/CHOKE & KILL UNES 5.7-1/16" - 5000 PSI SINGLE GATE W/ BLIND .RAMS 6.7-1/16" - 5000 PSI SINGLE GATE W/PIPE RAMS 7.7-1/16" - 5000 PSI ANNULAR PREVENTER ACCUMULATOR CAPACITY TEST CHECK AND. FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAUUC FLUID. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. RECORD ON THE IADC REPORT. THE ACCEPTABI.E LOWER UMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. ~OP STACK TEST FILL BOp STACK AND MANIFOLD WITH WATER CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD, RUN IN LOCK-DOWN SCREWS IN HEAD. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. ALL OTHERS OPEN. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 5 MINUTES. INCREASE PRESSURE TO 3500 PSI AND HOLD FOR 5 MINUTES. BLEED TO ZERO PSI. OPEN ANNULAR PREVENTOR AND INSIDE MANUAL KILL AND CHOKE LINE VALVES. CLOSE TOP PIPE RAMS, HCR VALVE ON CHOKE LINE, AND OUTSIDE MANUAL VALVE ON KILL LINE. TEST TO 250 PSI AND 3500 PSI AS IN STEP 4. CONTINUE TESTING AL VALVES, LINES, AND CHOKES WITH A 250 PSI LOW AND 3500 PSI HIGH, TEST AS IN STEP 4. DO NOT PRESSURE TEST ANY CHOKE THAT IS NOT A FULL CLOSING POSITIVE SEAL CHOKE. OPEN TOP PIPE RAMS AND CLOSE Bo3-rOM PIPE RAMS. TEST BOTTOM RAMS TO 250 PSI AND 3500 PSI. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE." ' CLOSE BLIND RAMS AND TEST TO 3500 PSI FOR 5 MINUTES. BLEED TO ZERO PSI. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD ,AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILUNG POSITION, TEST STANDPIPE VALVES TO 3500 PSI. TEST KELLY COCKS AND INSIDE BOP TO 3500 pSI'wITH KOOMEY PUMP. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST' FORM, SIGN AND SEND TO DRILLING SUPERVISOR. ' ' PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. n co nc. ALPINE DISBURSEMENT ACCOUNT P.O. Box 103240 Anchorage, AK 99510-3240 PAY TO THE ORDER OF: 839 CHECK NUMBER 249003209 0990337 APRIL 9, 1999 :i -i ': ' ':: ALASKA DEPT OF REVENUE ALASKA OIL & GAS' cONSERVATION COMMI The First Nati°naii Bank o{ chica{J°'0710 Chicago, :.Illinois payable Through Republic Bank Shelbyville, Kentucky 3001 PORCUPINE DRIVE : i. :~: i ~i,: ~ ' i:.:"':t :::': : ::'::':' ~':' ":': :: ':' O0 CENts ,~*:'**~'******'100'00 : :. i : ~,,~x,~cr.¥ *******%.*~oo oo'~'~s ~o :i .! :- -: . ::i :i: TRACE NUMBER: 249003209 ,. ;~,clO0:~ Poq"' ,:O~qOt, 2r-,, ;~: 0 q qo ~ ~ ?"' 1. Type of request STATE OF ALASKA " ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS don _X Suspend _ Operational shutdown _ Re-enter suspended well _ Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _ Change approved program _ Pull tubing _ Variance _ Perforate _ Other _ 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360 Anchora~le, AK 99510-0360 4. Location of well at surface 1220' FNL, 281' FWL, Sec. 12, T12N, R8E, UM At top of productive interval 1386' FSL, 1420' FWL, Sec. 3, T12N, R8E, UM At effective depth At total depth 1440' FSL, 1216' FWL, Sec. 3, T12N, R8E, UM 5. Type of Well: Development _X Exploratory _ Stratigraphic _ Service _ 6. Datum elevation (DF or KB feet) RKB 80', Pad 39' Gl feet 7. Unit or Property name Kuparuk River Unit 8. Well number 3H-25 9. Permit number / approval number 94-16 10. APl number 50-103-20203 11. Field / Pool Kuparuk River Field/Kuparuk Oil Poe 12. Present well condition summar Total depth: measured 12410 true vertical 6131 Effective depth: measured 12309 true vertical 6060 Casing Length Size Conductor 121' 16" Surface 4751' 9.625" Production 12391' 7" Liner feet Plugs (measured) feet feet Junk (measured) feet Cemented 200 sx AS I 780 sx AS III, 740 sx Class G & 125 sx ASI cmt top job 250 sx Class G Measured Depth True vertical Depth 121' 121' 4751' 3004' 12391' 6118' Perforation depth: measured 12136'-12166' true vertical 5939'-5960' Tubing (size, grade, and measured depth' Packers & SSSV (type & measured depth) 3.5", 9.3#, L-80 @ 12037' Baker 'FHL' retr. pkr @ 12011' Camco 'TRDP-4E' SSSV @ 1944' 13. Attachments Description summary of proposal __X Detailed operations program __ 14. Estimated date for commencing operation 15. Status of well classification as: May 10, 1999 16. If proposal was verbally approved Oil __X Gas m Name of approver Date approved Service _ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. BOP sketch__ Suspended __ Questions? Call Mark Chambers 265-1319 SignedChipA~,ord /.~,~. ~/. ~,..~.~,} Title: Drilling Engineering Supervisor - FOR COMMISSION USE ONLY Date ~ IZ-~I~) Prepared by Sharon AIIsup-Drake Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test _ Location clearance _ Mechanical Integrity Test _ Subsequent form required 10- Approval no. ARp, ro, ve, d by orde,r,qf the Commission Commissioner Date Form 10-403 Rev 06/15/88 · SUBMIT IN TRIPLICATE COMPANY /~/~,,-_,.-~ __ dev ~ redrll ~ serv __ wellbore seg ann. disposal para req __ WELL PERMIT CHECKLIST WELL NAME/~~ ~//~'~ PROGRAM: exp FIELD & POOL ADMINISTRATION 1. INIT CLASS Z~,~," . 3. 4. 5. 6. 7. 8. 9. 10. 11. AP,~DR DATE 12. ENGINEERING 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. DATE 26. ~/~T~'~ 27. 28. 29. GEOLOGY 30. 31. 32. 34. ANNULAR DISPOSAL 35. APPR DATE Permit fee attached ....................... Lease number appropriate ................... Unique well name and number .................. Well located in a defined pool .................. Well located proper distance from ddlling unit boundary .... Well located proper distance from other wells .......... Sufficient acreage available in ddlling unit ............ If deviated, is wellbore plat included ............... Operator only affected party ................... Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can be issued without administrative approval ...... Can permit be approved before 15-day wait ........... Conductor stdng provided ................... Surface casing protects all known USDWs ........... CMT vol adequate to circulate on conductor & surf csg ..... CMT vol adequate to tie-in long string to surf csg ........ CMT will cover all known productive horizons .......... Casing designs adequate for C, T, B & permafrost ....... Adequate tankage or reserve pit ................. If a re-drill, has a 10-403 for abandonment been approved... Adequate wellbore separation proposed ............. If diverter required, does it meet regulations .......... Drilling fluid program schematic & equip list adequate ..... BOPEs, do they meet regulation ................ BOPE press rating appropriate; test to 5"'OOc'~ psig. Choke manifold complies w/APl RP-53 (-May 84) ........ Work will occur without operation shutdown ........... GEOL Y~ YR YR ¥~ Y,~ YR Y~ Y~ YR YR Y ~ Y R ¥~ )N N N Is presence of H2S gas probable ................. Y Permit can be issued w/o hydrogen sulfide measures ..... Y N//Z!J''~' Data presented on potential overpressure zones ....... Y Seismic analysis of shallow gas zones ............. Y Seabed condition survey (if off-shore) ............. Y/ Contact name/phone for weekly progress reports [exploratory only~ N With proper cementing records, this plan (A) will contain waste in~~e_~ receiv~ zone; ....... Y N (B) will not conta..o3i~te freshwater.pr'cause drilling~/aste... Y N to surfac. (C) ~grity ofth~ll used for disposal; Y N (D)).~' ~~ingnot damage pro cing formationformation or ior impair recovery from a Y N poo~; ina (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N UNIT# ON/OFF SHORE GEOLO~j.Y: ENGINEERINC~; UIC/Arjnular / COMMISSION: RP{~_ BEW ,~"~ VY,~i ~/ '/ ~ ~C .--I~,~--~~ JDH ~ CO Comments/Instructions: c:\msoffice\wordian\diana\checklist Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this. .nature is accumulated at the end of the rite under APPE .N. DIXi No 'special 'effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Wed Nov 17 10:28:45 1999 Reel Header Service name ............. LISTPE Date ..................... 99/11/17 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/11/17 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER KUPARUK RIVER UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: MWD RUN 2 AK-MM-90125 K. ALLEN D. WESTER 3H-25A 501032020301 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 17-NOV-99 MWD RUN 6 AK-MM-90125 E. CRIBBS D. WESTER 12 12N 0SE 1220 281 60.50 RECEIVED Alaska 0i~ ~ t~as 6o~$. ~A~ ~nchorage DERRICK FLOOR: GROUND LEVEL: # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING # REMARKS: 60.50 30.30 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 16.000 121.0 9.625 4751.0 7.000 11196.0 6.125 15240.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 WAS DIRECTIONAL ONLY AND IS NOT PRESENTED. 3. MWD RUNS 2, 6 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS,AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). THE EWR4 MEMORY BOARD ON MWD RUN 6 FILLED AT 14992'MD, AND ONLY REAL TIME DATA IS AVAILABLE THEREAFTER. 4. THIS WELL SIDETRACKS FROM BOTH 3H-25A PB1 & PB2 AT 12201'MD, 5816'TVD. 5. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE E MAIL MESSAGE FROM D. SCHWARTZ FOR T. HILLEGEIST OF ARCO ALASKA, INC. ON 10/26/99. THIS DATA IS CONSIDERED PDC. 6. MWD RUNS 2 & 6 REPRESENT WELL 3H-25A WITH API#: 50-103-20203-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 15240'MD, 5973'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA-SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/17 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. .5000 DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR FET RPD RPM RPS RPX ROP $ START DEPTH STOP DEPTH 11170.0 15195.5 11186.0 14992.0 11186.0 15202.5 11186.0 14992.0 11186.0 14992.0 11186.0 14992.0 11215.0 15240.5 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 2 11215.0 12201.0 6 12201.0 15240.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FET MWD HOUR 4 1 68 4 2 RPX MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPM MWD OHMM 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 GR MWD API 4 1 68 24 7 ROP MWD FT/H 4 1 68 28 8 First Name Min Max Mean Nsam Reading DEPT 11170 15240.5 13205.2 8142 11170 Last Reading 15240.5 FET 0.61 358.21 11.8542 7613 RPX 0.23 2000 6.17707 7613 RPS 0.52 1709.59 9.01062 7613 RPM 0.21 2000 33.2223 7613 RPD 1.41 2000 37.7814 8034 GR 46.62 570.64 140.346 8052 ROP 0.06 684.93 59.5801 8052 11186 11186 11186 11186 11186 11170 11215 14992 14992 14992 14992 15202.5 15195.5 15240.5 First Reading For Entire File .......... 11170 Last Reading For Entire File ........... 15240.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/17 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/17 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP $ 11170 0 11186 0 11186 0 11186 0 11186 0 11186 0 11215 0 LOG HEADER DATA DATE LOGGED: SOFTWARE STOP DEPTH 12201.0 12201 0 12201 0 12201 0 12201 0 12201 0 12201 0 06-JUN-99 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY S): MUD PH: MUD CHLORIDES PPM): FLUID LOSS (C3 : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ................ J ..... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 I3.23 5.16/2.41/10.87/0.37/8.28 MEMORY 12201.0 11215.0 12201.0 60.9 88.1 TOOL NUMBER P1310WMGRV4 P1310WMGRV4 6.130 6.1 LSND 10.10 42.0 10.5 27000 10.0 .170 .090 .130 .250 141.0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FET MWD 2 HOUR 4 1 68 4 2 RPD MWD 2 OHMM 4 1 68 8 3 RPM MWD 2 OHMM 4 1 68 12 4 RPS MWD 2 OHMM 4 1 68 16 5 RPX MWD 2 OHMM 4 1 68 20 6 GR MWD 2 API 4 1 68 24 7 ROP MWD 2 FT/H 4 1 68 28 8 First Name Min Max Mean Nsam Reading DEPT 11170 12201 11685.5 2063 11170 FET 0.61 2.6 1.20633 2031 11186 RPD 2.11 2000 11.3166 2031 11186 RPM 0.21 2000 12.9216 2031 11186 RPS 0.87 1632.32 6.43797 2031 11186 RPX 0.23 1574.02 5.90925 2031 11186 GR 53.29 570.64 174.066 2063 11170 ROP 1.03 201.57 49.2588 1973 11215 Last Reading 12201 12201 12201 12201 12201 12201 12201 12201 First Reading For Entire File .......... 11170 Last Reading For Entire File ........... 12201 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/17 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/17 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET RPD RPM RPS RPX GR ROP $ 12201.5 12201 5 12201 5 12201 5 12201 5 12201 5 12202 5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 14992 0 15202 5 14992 0 14992 0 14 992 0 15195 5 15240 5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 23-JUN-99 I3.23 5.16/2.41/10.87/0.37/8.28 MEMORY 15240.0 12201.0 15240.0 81.0 96'.6 TOOL NUMBER P1327WGRV4 P1327WGRV4 6.130 6.1 LSND 10.80 62.0 9.3 27000 3.5 .130 .130 .130 .180 155.9 .6. REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam DEPT FT 4 1 GR MWD 6 API 4 1 RPX MWD 6 OHMM 4 1 RPS MWD 6 OHMM 4 1 RPM MWD 6 OHMM 4 1 RPD MWD 6 OHMM 4 1 ROP MWD 6 FT/H 4 1 FET MWD 6 HOUR 4 1 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name DEPT GR RPX RPS RPM RPD ROP FET Min 12201.5 46.62 0 42 0 52 0 91 1 41 0 06 0 76 Max Mean Nsam 15240.5 13721 6079 279.93 128.73 5989 2000 6.27452 5582 1709.59 9.94668 5582 2000 40.6086 5582 2000 46.7353 6003 684.93 62.8573 6077 358.21 15.7285 5582 First Reading 12201 5 12201 5 12201 5 12201 5 12201 5 12201 5 12202.5 12201.5 Last Reading 15240.5 15195.5 14992 14992 14992 15202.5 15240.5 14992 First Reading For Entire File .......... 12201.5 Last Reading For Entire File ........... 15240.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/17 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/11/17 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Reel Trailer Service name ............. LISTPE Date ..................... 99/11/17 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Technical Scientific Technical Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Tue Nov 16 15:02:49 1999 Reel Header Service name ............. LISTPE Date ..................... 99/11/16 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/11/16 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER KUPARUK RIVER UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: MWD RUN 2 AK-MM-90125 K. ALLEN D. WESTER 3H-25A PB1 501032020370 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 16-NOV-99 RECEIVED ., , , NOV 999: 12N o s E N~!~,Oil & GaS Cons. Commi~i.o~ 12 2 o ~chom~e 281 60.50 DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING # REMARKS: 60.50 30.30 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 16.000 121.0 9.625 4751.0 7.000 11196.0 6.125 15240.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 WAS DIRECTIONAL ONLY AND IS NOT PRESENTED. 3. MWD RUN 2 WAS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) 4. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE E MAIL MESSAGE FROM D. SCHWARTZ FOR T. HILLEGEIST OF ARCO ALASKA, INC. ON 10/26/99. THIS DATA IS CONSIDERED PDC. 5. MWD RUN 2 REPRESENTS WELL 3H-25A PB1 WITH API%: 50-103-20203-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 14458'MD, 5959'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA-SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE GR FET RPD RPM RPS RPX ROP $ START DEPTH 11170 0 11186 0 11186 0 11186 0 11186 0 11186 0 11215 0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: STOP DEPTH 14414 5 14421 5 14421 5 14421 5 14421 5 14421 5 14460.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 2 11215.0 14458.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD API 4 1 68 4 2 RPD MWD OHMM 4 1 68 8 3 ROP MWD FT/H 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 RPS MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Name Min Max Mean Nsam Reading DEPT 11170 14460 12815 6581 11170 GR 53.29 570.64 154.471 6490 11170 RPD 2.11 2000 70.8047 6472 11186 ROP 0.16 1945.75 57.485 6491 11215 RPX 0.23 1574.02 5.18131 6472 11186 RPS 0.87 1632.32 7.11007 6472 11186 RPM 0.21 2000 58.5742 6472 11186 Last Reading 14460 14414.5 14421.5 14460 14421.5 14421.5 14421.5 FET 0.29 48.24 1.9423 6472 11186 14421.5 First Reading For Entire File .......... 11170 Last Reading For Entire File ........... 14460 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 11170 0 11186 0 11186 0 11186 0 11186 0 11186 0 11215 0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): STOP DEPTH 14414 5 14421 5 14421 5 14421 5 14421 5 14421 5 14460 0 06-JUN-99 I3.23 5.16/2.41/10.87/0.37/8.28 MEMORY 14458.0 11215.0 14458.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 60.9 88.1 TOOL NUMBER P13EOWMGRV4 P1310WMGRV4 6.130 6.1 LSND 10.10 42.0 10.5 27000 10.0 .170 .090 .130 .250 141.0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 API 4 1 68 4 2 RPX MWD 2 OHMM 4 1 68 8 3 RPS MWD 2 OHMM 4 1 68 12 4 RPM MWD 2 OHMM 4 1 68 16 5 RPD ROP FET MWD MWD MWD OHMM 4 1 68 FT/H 4 1 68 HOUR 4 1 68 20 24 28 Name DEPT GR RPX RPS RPM RPD ROP FET Min 11170 53 29 0 23 0 87 0 21 2 11 0 16 0 29 Max Mean 14460 12815 570.64 154.471 1574.02 5.18131 1632.32 7.11007 2000 58.5742 2000 70.8047 1945.75 57.485 48.24 1.9423 Nsam 6581 6490 6472 6472 6472 6472 6491 6472 First Reading 11170 11170 11186 11186 11186 11186 11215 11186 Last Reading 14460 14414.5 14421.5 14421.5 14421.5 14421.5 14460 14421.5 First Reading For Entire File .......... 11170 Last Reading For Entire File ........... 14460 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/11/16 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Reel Trailer Service name ............. LISTPE Date ..................... 99/11/16 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Technical Scientific Technical Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Tue Nov 16 14:54:16 1999 Reel Header Service name ............. LISTPE Date ..................... 99/11/16 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/11/16 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER KUPARUK RIVER UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: MWD RUN 2 AK-MM-90125 K. ALLEN D. WESTER 3H-25A PB2 501032020371 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 16-NOV-99 MWD RUN 5 AK-MM-90125 K. ALLEN D. WESTER 12 12N 08E 1220 RECEIVED · , · Gas CoDs. COIlilI!IJ~JP..D chomge 281 60.50 DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 60.50 30.30 OPEN HOLE CASING DRILLERS BIT SIZE (IN} SIZE (IN} DEPTH (FT} 16.000 121.0 9.625 4751.0 7.000 11196.0 6.125 13247.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 WAS DIRECTIONAL ONLY AND IS NOT PRESENTED. 3. MWD RUNS 2 & 5 WERE DIRECTIONAL WITH DUAL GAMMA RAY {DGR} UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) 4. MWD RUN 5 SIDETRACKED FROM 3H-25A PB1 AT 12201~MD, 5816'TVD. 5. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE E MAIL MESSAGE FROM D. SCHWARTZ FOR T. HILLEGEIST OF ARCO ALASKA, INC. ON 10/26/99. THIS DATA IS CONSIDERED PDC. 6. MWD RUNS 2 & 5 REPRESENT WELL 3H-25A PB2 WITH API%: 50-103-20203-71. THIS WELL REACHED A TOTAL DEPTH (TD} OF 13247~MD, 5960~TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA-SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING}. SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 11170 0 FET 11186 0 RPD 11186 0 RPM 11186 0 RPS 11186 0 RPX 11186 0 ROP 11215 0 $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: STOP DEPTH 13200 0 13207 0 13207 0 13207 0 13207 0 13207 0 13246 0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 2 11215.0 12201.0 5 12201.0 13247.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD API 4 1 68 4 2 RPX MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPM MWD OHMM 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 ROP MWD FT/H 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Name Min Max Mean Nsam Reading DEPT 11170 13246 12208 4153 11170 GR 53.29 570.64 161.682 4061 11170 RPX 0.23 1574.02 5.63123 4043 11186 RPS 0.87 1632.32 7.23662 4043 11186 Last Reading 13246 13200 13207 13207 RPM 0.21 2000 41.3168 4043 RPD 2.11 2000 46.6939 4043 ROP 0.05 1693.27 68.932 4063 FET 0.13 242.88 1.76337 4043 11186 11186 11215 11186 13207 13207 13246 13207 First Reading For Entire File .......... 11170 Last Reading For Entire File ........... 13246 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 11170 0 11186 0 11186 0 11186 0 11186 0 11186 0 11215 0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): STOP DEPTH 12201 0 12201 0 12201 0 12201 0 12201 0 12201 0 12201 0 06-JUN-99 I3.23 5.16/2.41/10.87/0.37/8.28 MEMORY TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ # Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 12201.0 11215.0 12201.0 60.9 88.1 TOOL NUMBER P1310WMGRV4 P1310WMGRV4 6.130 6.1 LSND 10.10 42.0 10.5 27000 10.0 .170 .090 .130 .250 141.0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FET MWD 2 HOUR 4 1 68 4 2 RPD MWD 2 RPM MWD 2 RPS MWD 2 RPX MWD 2 ROP MWD 2 GR MWD 2 OHMM 4 1 68 OHMM 4 1 68 OHMM 4 1 68 OHMM 4 1 68 FT/H 4 1 68 AP1 4 1 68 8 12 16 20 24 28 Name DEPT FET RPD RPM RPS RPX ROP GR Min 11170 0 61 2 11 0 21 0 87 0 23 1 O3 53 29 Max Mean Nsam 12201 11685.5 2063 2.6 1.20633 2031 2000 11.3166 2031 2000 12.9216 2031 1632.32 6.43797 2031 1574.02 5.90925 2031 201.57 49.2588 1973 570.64 174.066 2063 First Reading 11170 11186 11186 11186 11186 11186 11215 11170 Last Reading 12201 12201 12201 12201 12201 12201 12201 12201 First Reading For Entire File .......... 11170 Last Reading For Entire File ........... 12201 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 12201.5 RPD 12201.5 RPM 12201.5 RPS 12201.5 RPX 12201.5 GR 12201.5 ROP 12202.0 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED {RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 13207.0 13207.0 13207.0 13207.0 13207.0 13200.0 13246.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ 12-JUN-99 I3.23 5.16/2.41/10.87/0.37/8.28 MEMORY 13247.0 12201.0 13247.0 81.8 91.5 TOOL NUMBER P1311WMGRV4 P1311WMGRV4 6.130 6.1 LSND-HT 10.80 62.0 9.3 27000 3.5 .2.80 .150 .140 .160 135.0 .6 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD 5 API 4 1 68 RPX MWD 5 OHMM 4 1 68 RPS MWD 5 OHMM 4 1 68 RPM MWD 5 OHMM 4 1 68 RPD MWD 5 OHMM 4 1 68 ROP MWD 5 FT/H 4 1 68 FET MWD 5 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean Nsam DEPT 12201.5 13246 12723.8 2090 GR 81.24 285.98 148.894 1998 RPX 0.75 341.86 5.35058 2012 RPS 1.24 74.99 8.04282 2012 RPM 2.16 2000 69.9801 2012 RPD 3.34 2000 82.4052 2012 ROP 0.05 1693.27 87.1108 2089 FET 0.13 242.88 2.32568 2012 First Reading 12201 5 12201 5 12201 5 12201 5 12201 5 12201 5 12202 12201.5 Last Reading 13246 13200 13207 13207 13207 13207 13246 13207 First Reading For Entire File .......... 12201.5 Last Reading For Entire File ........... 13246 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/11/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/11/16 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Services Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 99/11/16 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Scientific Technical Technical Physical EOF Physical EOF End Of LIS File