Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-038Suspended Well Inspection Review Report Reviewed By: P.I. Suprv Comm ________ JBR 10/27/2025 InspectNo:susGDC250903211827 Well Pressures (psi): Date Inspected:9/2/2025 Inspector:Guy Cook If Verified, How?Other (specify in comments) Suspension Date:7/3/2021 #321-280 Tubing:0 IA:100 OA:0 Operator:Hilcorp Alaska, LLC Operator Rep:Steve Soroka Date AOGCC Notified:8/31/2025 Type of Inspection:Subsequent Well Name:MILNE PT UNIT S-24 Permit Number:2030380 Wellhead Condition Wellhead was in good condition. There is a wellhouse in place protecting the well from the elements. Well still connected to flowline and only isolated by the wing valve. Surrounding Surface Condition Good clean gravel pad with no signs of hydrocarbons. Condition of Cellar Water in the cellar. No signs of hydrocarbons. Comments Well location verified by well-site pad map. Supervisor Comments Photos (8) attached Suspension Approval:Sundry Location Verified? Offshore? Fluid in Cellar? Wellbore Diagram Avail? Photos Taken? VR Plug(s) Installed? BPV Installed? Monday, October 27, 2025            2025-0902_Suspend_MPU_S-24_photos_gc Page 1 of 4 Suspended Well Inspection – MPU S-24 PTD 2030380 AOGCC Inspection Rpt # susGDC250903211827 Photos by AOGCC Inspector G. Cook 9/2/2025 2025-0902_Suspend_MPU_S-24_photos_gc Page 2 of 4 Valve Tree SSV and Actuated Wing Valve 2025-0902_Suspend_MPU_S-24_photos_gc Page 3 of 4 Tree Cap Pressure Gauge (Tbg Pressure) IA Pressure Gauge 2025-0902_Suspend_MPU_S-24_photos_gc Page 4 of 4 Well Cellar OA Pressure Gauge Hilcorp Alaska, LLC David Haakinson, Milne Point Operations Manager 3800 Centerpoint Dr, Suite 400 Anchorage, Alaska 99503 08/19/2022 Chairman Jeremy Price Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Docket Number: OTH-22-025, Notice of Violation. Suspended Well Inspection Requirements. Milne Point Unit S-24 (PTD 203-038), S-32 (PTD 203-092), S-35 (PTD 203-143), Hilcorp Alaska, LLC. Dear Chairman Price, Please see below for information requested per Docket Number: OTH-22-025 on 08/17/2022 regarding suspended well inspection requirements for Milne Point Wells S-24 (PTD 203-038), S-32 (PTD 203-092), S-35 (PTD 203-143). Event Summary: Milne Point wells S-24 (suspended on 7/3/2021), S-32 (suspended on 6/24/2021), and S-35 (suspended on 9/19/2021) required inspections within 12 months after initial suspension. Upon review of our records on 07/25/2022, S-24 and S-32 were identified as being overdue for the initial inspection. On 07/26/2022, Hilcorp self-reported the issue and the AOGCC was notified of the delinquency and informed that the inspections would be submitted as soon as possible. The well inspections were completed and witnessed on 07/29/2022. Inspections were submitted for S-35 and S-24 on 08/05/2022 for record. S-32 inspection was submitted for record on 8/8/2022. Photos were taken during the inspection but lacked clarity needed to clearly identify well information. Investigation Details: Recent timeline of events leading to the late inspections: o 06/24/2022: S-32 (PTD 203-092) Initial suspended well inspection due. o 07/03/2022: S-24 (PTD 203-038) Initial suspended well inspection due. o 07/25/2022: Identified late inspections and communicated with the field to schedule inspection. o 07/26/2022: Communication to AOGCC that inspections would be late and the nature of the delay. o 07/29/2022: Field inspections of the suspended wells were completed. o 08/05/2022: S-24 (PTD 203-038) and S-35 (PTD 203-143) inspections submitted for record. o 08/08/2022: S-32 (PTD 203-092) inspection submitted for record. The suspended well inspection and renewal requirements are currently tracked within a manual entry spreadsheet monitored by the Well Integrity Engineer. As well statuses change and inspections are completed, the Well Integrity Engineer is responsible for updating the data accordingly. Periodic review of the data is completed to ensure compliance per 20 AAC 25.110(e). A review was conducted and identified two inspections not completed by their due date. Notification was sent to the field to conduct the inspections as soon as possible and a call was placed to AOGCC to self-report the late inspections. The inspections were completed and subsequently submitted for record. Photos were taken during the inspection and submitted as part of the record. During the process of taking and sending photos clarity of signage was not sufficient for all the well details. Hilcorp regrets this error. In MPU S-35’s case, the wellhouse was removed and placed nearby for gravel work at the time of photographs. Root cause of the incident: x Well Integrity Engineer failed to extract the correct information from the current data management system. By Samantha Carlisle at 3:48 pm, Aug 19, 2022 Contributing factors of the incident: x Manual entry and tracking of data with no automated alert in place to notify of upcoming and past-due obligations. Actions to prevent recurrence: x Migrate Milne Point Unit and Alaska Islands (Northstar, Endicott, and Point Thomson) teams to the Alaska Integrity Management System adopted by the Prudhoe Bay Unit which includes automated alerts for approaching and past-due obligations with notifications provided to personnel responsible for regulatory reporting. (Project began in May 2022 and targeted initial rollover by 1 September 2022. Full functionality planned to be in place by end of year 2022.) x Communicate to the company representatives photo requirements with regards to quality and content. x Communication to company representatives that well signage must be moved from wellhouse to wellhead in event of wellhouse removal. If you have any questions, please call me at 907-777-8343 or Jerimiah Galloway at 907-564-5005. Sincerely, David Haakinson Milne Point Operations Manager Digitally signed by David Haakinson (3533) DN: cn=David Haakinson (3533), ou=Users Date: 2022.08.19 11:29:28 -08'00' David Haakinson (3533)  Žƒ•ƒ‹Žƒ† ƒ• ‘•‡”˜ƒ–‹‘‘‹••‹‘   333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov  August 17, 2022 CERTIFIED MAIL – RETURN RECEIPT REQUESTED 7018 0680 0002 2052 9723 Mr. David Haakinson MPU Operations Manager Hilcorp Alaska, LLC P.O. Box 244027 Anchorage, AK 99524-4027 Re: Docket Number: OTH-22-025 Notice of Violation Suspended Well Inspection Requirements Milne Point Unit S-24 (PTD 203-038) Milne Point Unit S-32 (PTD 203-092) Milne Point Unit S-35 (PTD 203-143) Dear Mr. Haakinson: Hilcorp Alaska, LLC (Hilcorp) conducted several Alaska Oil and Gas Conservation Commission (AOGCC) witnessed initial suspended well inspections on the Milne Point Unit (MPU) Spad wells listed above. Inspections occurred on July 29, 2022. All wells had at least one issue with the inspection or the inspection report: - MPU S-24: 20 AAC 25.110(e) requires the initial inspection of a suspended well to occur within 12 months of the date of suspension. The well was initially suspended on July 3, 2021, so the July 29th inspection was conducted 26 days late. The quality of photos submitted with the inspection report were too poor to assess whether the well sign meets the requirements of 20 AAC 25.040. - MPU S-32: 20 AAC 25.110(e) requires the initial inspection of a suspended well to occur within 12 months of the date of suspension. The well was initially suspended on June 24, 2021, so the July 29th inspection was more than a month overdue. The quality of photos submitted with the inspection report were too poor to assess whether the well sign meets the requirements of 20 AAC 25.040. - MPU S-35: Inspection report does not demonstrate that the well has the sign required by 20 AAC 25.040. Within 14 days of receipt of this letter, you are requested to provide the AOGCC with: Docket Number: OTH-22-025 Notice of Violation August 17, 2022 Page 2 of 2 1) a written description of why wells MPU S-24 and MPU S-32 were not inspected within 12 months of the date of initial suspension as required by 20 AAC 25.110(e) and what steps Hilcorp will take to ensure that initial suspended well inspections will occur within the time frame prescribed by the regulations. And, 2) legible photographs demonstrating that the three wells have signs that meet the requirements of 20 AAC 25.040. The AOGCC reserves the right to pursue addition enforcement action in connection with this Notice of Violation. Questions regarding this letter should be directed to Dave Roby at dave.roby@alaska.gov or (907)793-1232. Sincerely, Jeremy M. Price Chair, Commissioner cc: AOGCC Inspectors Jim Regg, AOGCC Phoebe Brooks, AOGCC Jeremy Price Digitally signed by Jeremy Price Date: 2022.08.17 13:52:12 -08'00' Suspended Well Inspection Review Report Reviewed By: P.I. Suprv Comm ________ JBR 08/30/2022 InspectNo:susAGE220802140422 Well Pressures (psi): Date Inspected:7/29/2022 Inspector:Adam Earl If Verified, How?Other (specify in comments) Suspension Date:7/3/2021 #321-280 Tubing:0 IA:100 OA:0 Operator:Hilcorp Alaska, LLC Operator Rep:Derek Weglin Date AOGCC Notified:7/27/2022 Type of Inspection:Initial Well Name:MILNE PT UNIT S-24 Permit Number:2030380 Wellhead Condition good working condition, wellhouse still on Surrounding Surface Condition good, clean and free of sheen or trash. Condition of Cellar water in cellar do to recent heavy rain ,water level is below valves, to be sucked out soon. Comments Verified by pad map, Photo in shared drive Supervisor Comments Photo (1) attached Suspension Approval:Sundry Location Verified? Offshore? Fluid in Cellar? Wellbore Diagram Avail? Photos Taken? VR Plug(s) Installed? BPV Installed? Tuesday, August 30, 2022 9 9 9 9 9 9 9 9 9 2022-0729_Suspend_MPU_S-24_photo_ae Page 1 of 1 Suspended Well Inspection – MPU S-24 PTD 2030380 AOGCC Inspect # susAGE2208021404232 Photo by AOGCC Inspector A. Earl 7/29/2022 By Anne Prysunka at 2:34 pm, Aug 05, 2022 1. Operations Abandon Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Suspend Perforate Other Stimulate Alter Casing Change Approved Program Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well Other: Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 8,205 feet N/A feet true vertical 3,890 feet N/A feet Effective Depth measured 4,362 feet feet true vertical 3,832 feet feet Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet 4-1/2"12.6# / L-80 / IBT-M 4,651' 3,960' Tubing (size, grade, measured and true vertical depth)3-1/2"9.2# / L-80 / NSCT 4,719' 3,984' Packers and SSSV (type, measured and true vertical depth)N/A N/A 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13. Prior to well operation: Subsequent to operation: 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name:Chad Helgeson Contact Name: Authorized Title:Operations Manager Contact Email: Contact Phone: Production 7-5/8"4,991' 5,022' 4,035' 4,664 & 4,765 3,965 & 4,000 6,890psi 777-8343 2. Operator Name 80' 2,672' measured Casing Tubing Pressure 0 Senior Engineer: Senior Res. Engineer: Collapse N/A 2,470psi Burst N/A 5,210psi Liner N/A N/A Conductor Size Junk Length Surface 20" 10-3/4" 7,910psi 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 321-280 N/A Authorized Signature with date: David Haakinson dhaakinson@hilcorp.com 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 203-038 50-029-23142-00-00 Plugs ADL0380109 5. Permit to Drill Number: MILNE POINT / SCHRADER BLUFF OIL 3. Address: 4. Well Class Before Work: 0 Representative Daily Average Production or Injection Data N/A0 measured 113' Oil-Bbl MILNE PT UNIT S-24 WINJ WAG 0 Water-Bbl MD 113' 2,575'2,704' TVD Gas-Mcf 7-5/8" x 4-1/2" S- 3 & ZXP Liner Top Packer 0 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 0 0 Casing Pressure Hilcorp Alaska LLC measured true vertical Packer 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 4,664' MD/3,965' TVD & 4,765' MD/4,000 TVD 4,790psi 6,590psi3,440' 4" 8,205' 3,890' L G Form 10-404 Revised 3/2020 Submit Within 30 days of Operations By Samantha Carlisle at 8:36 am, Aug 03, 2021 Digitally signed by Chad Helgeson (1517) DN: cn=Chad Helgeson (1517), ou=Users Date: 2021.08.02 18:31:18 -05'00' Chad Helgeson (1517) MGR04AUG21 DSR-8/3/21 RBDMS HEW 8/4/2021 Well Name Rig API Number Well Permit Number Start Date End Date MP S-24 Coiled Tubing/ Slickline 50-029-23142-00-00 203-038 6/15/2021 7/3/2021 MIT-T to 1500 psi (PASSED) (Witnessed by Matt Herrera) (Pressure test surface lines 250/2500 psi) Pump 0.5 bbls Dsl down Tbg to reach Test pressure. 1st 15 Min Tbg lost 110 psi. 2nd 15 Min Tbg lost 26 psi. Bleed Tbg down w/ 0.5 bbls dsl returned. 6/19/2021 - Saturday MIT-T Cement post CTU (Pressure test surface lines 250/2500 psi) MIT-T passed @ 1459 psi. Pressured up TBG to 1596 psi with .3 bbls diesel. 1st 15 min TBG lost 100 psi. 2nd 15 min TBG lost 37 psi for a total loss of 137 psi. Bled TBG pressure to 200 psi and recovered .3 bbls. Tags hung. 6/20/2021 - Sunday WELL S/I ON ARRIVAL, DSO NOTIFIED, PT PCE 250L/2500H. DRIFTED W/ KJ, 3'x1-1/2" STEM, 2.30" CENT, SAMPLE BAILER & TAGGED @ 4,362' SLM, SAMPLE BAILER FULL OF CEMENT. WELL S/I ON DEPARTURE, DSO NOTIFIED. 7/3/2021 - Saturday 6/17/2021 - Thursday SLB Coiled Tubing arrive and conduct JSA and PTW. Halliburton Cement on location MIRU. RIH with 2" ball drop nozzle. Lay in 33 bbls of 15.8 ppg cement from 7450' to 4800'. Squeeze away an additional 6 bbls of cement. POOH pumping contamination pill following with diesel and water. RDMO. Hilcorp Alaska, LLC Weekly Operations Summary 6/16/2021 - Wednesday SLB coiled tubing arrive, JSA & PTW. MU lubricator to BOP's and test. Cleanout to 7486' ctmd. POOH and circulate well over to fluid. Pump diesel around coil. Change out nozzles. LDFN. SLB Coiled Tubing conduct JSA, approve PTW. MIRU, Cleanout from 4943' to 6380' ctmd with nitrified gel sweeps and 1% slick KCl. POOH with coiled tubing and close swab. LDFN. 6/15/2021 - Tuesday TOC: 4,362’ (slm 06/20/2021) 6/18/202 A.Tambe Reservoir Suspended MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg '-p`' ri ('Z& P.I. Supervisor �I FROM: Matt Herrera Petroleum Inspector DATE: July 3, 2021 SUBJECT: Plug Verification MPU S-24 - Hilcorp Alaska LLC PTD 2030380; Sundry 321-280 - Section: 12 Depth Btm Township: 12N Range: 10E , Meridian: Umiat " Drilling Rig: NA - Rig Elevation: 33.85 ft Total Depth: 8205 ft MD Lease No.: ADL0380109 Operator Rep: Jon Arend Suspend: X - P&A: Casing/Tubing Data (depths are MD): Casing Removal: Conductor: 20" - O.D. Shoe@ 113 Feet Csg Cut@ Feet Surface: 10 3/4" O.D. Shoe@ 2704 Feet Csg Cut@ Feet Intermediate: O.D. Shoe@ Feet Csg Cut@ Feet Production: 7 5/8" O.D. Shoe@ 5022 'Feet Csg Cut@ Feet Liner: 4" - O.D. Shoe@ 8205 -Feet Csg Cut@ Feet Tubing: 4 1/2"-3 1/2" O.D. Tail@ 4719 Feet Tbg Cut@ Feet Plugging Data: Test Data Type Plug Founded on Depth Btm Depth (Top) MW Above Verified Fullbore Bottom 8205 ft MD 4800 ft MD- 15.8 ppg- C.T. Tag Pre -Test Initial 15 min 30 min Result Tubing 208 1818 1708 - 1682 IA 642 645 645 - 645 P OA 18 17 18 19 Tubing IA OA Initial 15 min 30 min 45 min Result Remarks: MPU S-24 was originally drilled 4/2003 and put online as a Jet Pump Producer. Excessive solid production caused repeat downhole equipment failures. Well has been shut in since 2013. Well plan and Sundry referenced suspensing wellbore. Plugged ✓ with CTU pumping 55 bbls cement. AOGCC was given 24 hour prior notice to winess pressure test of cement plug once it had reached compressive strength Attachments: None ', rev. 11-28-18 2021-0703_PI ug_Verification_M PU_S-24_m h 1.Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ___________________ 2.Operator Name:4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3.Address:Stratigraphic Service 6. API Number: 7. If perforating:8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception?Yes No 9.Property Designation (Lease Number):10.Field/Pool(s): 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD): 8,205'N/A Casing Collapse Conductor N/A Surface 2,470psi Production 4,790psi Liner 6,590psi Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13.Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14.Estimated Date for 15. Well Status after proposed work: Commencing Operations:OIL WINJ WDSPL Suspended 16. Verbal Approval:Date:GAS WAG GSTOR SPLUG Commission Representative: GINJ Op Shutdown Abandoned Chad Helgeson Contact Name: Operations Manager Contact Email:Abhijeet.Tambe@hilcorp.com Contact Phone: 777-8485 Date: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Post Initial Injection MIT Req'd? Yes No Spacing Exception Required? Yes No Subsequent Form Required: APPROVED BY Approved by:COMMISSIONER THE COMMISSION Date: Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng 4.5# / L-80 / IBT 4,671' MILNE PT UNIT S-24 C.O. 477.05 7-5/8" x 4-1/2" Baker S-3 & ZXP LTP C2 Profile and N/A 4,664 MD / 3,965 TVD & 4,765 MD / 4,000 TVD and N/A Authorized Title: 17.I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. 3-1/2" Perforation Depth MD (ft): See Schematic See Schematic Perforation Depth TVD (ft): 4-1/2" 80' 20" 10-3/4" 7-5/8" 2,672' 4"3,440' 4,991' 7,910psi Tubing Size: 5,210psi 6,890psi 2,575' 4,035' 3,890' 2,704' 5,022' 8,205' N/A MILNE POINT / SCHRADER BLUFF OIL 113' 113' 9.2# / L-80 / TC-II TVD Burst 4,719' MD N/A Length Size 3,890' 8,205' 3,890' 1,094 PRESENT WELL CONDITION SUMMARY STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0380109 203-038 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-23142-00-00 Hilcorp Alaska LLC Tubing Grade: Tubing MD (ft): Abhijeet Tambe COMMISSION USE ONLY Authorized Name: Authorized Signature: 6/10/2021 ory Statu Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval. By Samantha Carlisle at 7:27 am, Jun 04, 2021 321-280 Chad Helgeson (1517) 2021.06.03 13:54:01 - 08'00' DLB 06/09/2021 10-404 within 30 days of work completion DSR-6/7/21MGR11JUN21 AOGCC to witness pressure test of cement plug to 1500 psi. X dts 6/11/2021 6/11/21 Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2021.06.11 10:58:51 -08'00' RBDMS HEW 6/11/2021 Reservoir Abandonment Well: MPU S-24 Date: 6/03/2021 Well Name:MPU S-24 API Number:50-029-23142-00-00 Current Status:Oil Producer Shut-In Pad:MP S-Pad Estimated Start Date:June 10, 2021 Rig:CTU #6 Reg. Approval Req’d?Yes Date Reg. Approval Rec’vd: Regulatory Contact:Tom Fouts Permit to Drill Number:201-078 First Call Engineer:Abhijeet Tambe (907) 777-8485 (O) (907) 331-9184 (M) Second Call Engineer:David Gorm (907) 777-8333 (O) (505) 215-2819 (M) AFE Number:WellEZ Entry Required:Yes Current Bottom Hole Pressure: 1,494 psi @ 4,000’ TVD (Last SBHP 08/18/2014; 1,841 psi 8.85 ppg EMW) Maximum Expected BHP:1,494 psi @ 4,000 TVD (EMW = 7.18 ppg) MPSP:1,094 psi (0.1 psi/ft gas gradient) Brief Well Summary: MPS-24 was originally drilled in April 2003 as a jet-pumped single-lateral Schrader Bluff N-sand only producer. The well was completed with premier Baker Excluder sand screens to hold back highly unconsolidated N-sand. Solids production has been a lingering problem with bailer runs often required. In July 2011, the power fluid rate increased dramatically. While in the well to change out the jet pump, a thick sludge with a high percentage of solids was discovered. Slickline was able to pull the jet pump and work to 4,737’ SLM with the assistance of LRS. Upon reaching 4,737’ SLM the tubing pressured up to 2,000 psi and slickline was unable to proceed further. In March 2012, coil jetted to the sliding sleeve & closed the sleeve. The well wouldn’t pass an MIT-IA so the rest of the FCO was not completed. Follow up SL work was done to diagnose the sliding sleeve and make sure it was closed. However, subsequent MIT-IAs failed. In March 2012, the well failed a MIT-IA and in April 2012 failed a MIT-T. An LDL was run in June and clearly identified a leak at 4,057’, with no other leaks identified. The LDL showed that the sliding sleeve was shut and not leaking. The first attempt to set a patch ended up getting stuck at 4,090’ MD and the patch was set. The patch was pulled after extensive jarring with SL. A 3.70”x20” drift was performed, and no restrictions were seen before a KB patch was set from 4,052’ – 4,062’ MD in October 2012 with a passing MIT-IA to 1,000 psi. A CT FCO to TD (8,194’ CTMD) was performed successfully in December 2012. Coil then perforated the last two joints of screens to prepare for a sand consolidation trial. A sand consolidation treatment was pumped in March 2013 and was not successful because the well still produced sand during the flowback. The patch was pulled, and SSD was opened in April 2013. After setting the nipple reducer (2.313” ID) a patch was set from 4,047.6’ – 4,065’ MD. Well has been shut-in since 2013. Notes Regarding Wellbore Condition x Successful MIT-IA to 4,200 psi on 07/17/2014 x Successful MIT-T to 2,000 psi on 05/03/2013 Reservoir Abandonment Well: MPU S-24 Date: 6/03/2021 Objective: 1. FCO with coil tubing (and N2 if needed) to TD. 2. Suspend the entire horizontal lateral with cement. The planned redevelopment pattern for the S-Pad Schrader Bluff requires this N-sand lateral to be suspended prior to drilling future well MPS-45 due to crossing a planned new injector to ensure proper reservoir flooding. MPS-24 must be suspended to 6,750’ MD to help minimize potential communication (MBE’s). Slicline Procedure: 1. MIRU SL. 2. MU shifting tool. 3. RIH and close HES “XD” sliding sleeve @ 4,614’ MD. 4. D&T, note tag depth and type of fill for CT FCO. Coil Tubing Procedure: 5. MIRU CT unit and spot support equipment. Fill uprights with 1% KCl. 6. Pressure test BOPE to 3,500 psi Hi, 250 psi low, 10 min Hi, 5 min Low each test. a. If within the standard 7-day test BOPE test period for Milne Point, a full body test and function test of the rams is sufficient. b. Each subsequent test of the lubricator will be to 3,500 psi Hi 250 Low to confirm no leaks. 7. RIH w/ 2” CT and JSN to WLEG at 4,719’ and begin FCO to a PBTD of 8,205’ md. a. A FCO to TD was successfully completed in 2012. b. To minimize potential communication with MPS-46, minimum target depth is 6,750’ MD. 8. POOH. 9.Contingency: If unable to wash down with nozzle, RIH w/motor & mill and extended reach cleanout BHA and cleanout to PBTD using 8.5 ppg 1% KCl w/ liquid foamer and mix with Nitrogen. POOH. 10. MU ball drop cementing nozzle and RIH to 8,205’ or deepest depth reached during FCO. 11. RU cementers. 12. Mix and pump 50 bbls of 15.8 ppg Class G cement down the coil tubing taking returns up the 4-1/2” tubing. Use freshwater spacers as needed around the cement. a. 4” liner vol: 0.0122 x (8,205’ – 4,800’) = ~42 bbls (adjust volume based on final cleanout depth reached) 13. Allow ~1 bbl of cement around the cementing nozzle and lay the rest of the cement in at 1:1. Pause at 4,950’ md and attempt to squeeze ±5 bbls cement until a bump in pressure is observed. 14. PU to 4,800’ and attempt to squeeze away ±5 bbls of cement. 15. Swap to contaminate and RIH to clean out to 4,800’ MD (planned TOC). 16. POOH and circulate coil tubing clean as needed. a. Freeze protect well on way out of hole. 17. Wait on cement to gain 1,000 psi compressive strength. 18. Pressure test cement to 1,500 psi for 30 min (charted). a. If the pressure test of the cement plug fails, contact the Operations Engineer to discuss pumping additional cement. b. Notify AOGCC 24 hours in advance to witness tag and pressure test. 19.Contingency: If cement top is below 4,951’ (top of screens), spot additional cement and repeat Steps #10-#14. 20. Freeze protect well. POOH. 21. RD CT unit. Reservoir Abandonment Well: MPU S-24 Date: 6/03/2021 Attachments: 1. As-built Schematic 2. Proposed Schematic 3. Coiled Tubing BOPE schematic 4. N2 Procedure & schematic for contingency (If necessary) Camco 4.5“ x 1” w/ BK latch sidepocket KGB-2 GLM DATE REV. BY COMMENTS Btm. Baker 4 1/2” Guide Shoe 8205’ 6 1/8“ Hole td @ 8205’ MILNE POINT UNIT 7 5/8“ HES Float Collar 4942‘ 7 5/8” HES Float Shoe 5022’ Baker ZXP Liner Top Packer 4765’ Baker 7 5/8“ x 5 1/2“ HMC Liner Hanger 4778‘ 2102‘ Phoenix Discharge gauge 4603‘ 4.5“ HES “XD” Dura sliding sleeve (3.850” id ) 4614‘ Phoenix Jet Pump gauge sensor 4637‘ NOTE: ID change min. 2.840“ 4.5“ x 3.5” X-Over 4651‘ 4662‘ 7 5/8“ x 4.5” Baker S-3 PKR. 3.875“ ID 4664‘ 3.5“ HES XN-Nipple (2.750” No Go) 4671‘ WLEG 4719‘ 3.5“ x 4.5” X-Over 4.5“ x 3.5” X-Over 4714‘ Min. ID through tubing 2.450“ @ 4051‘ Min. ID through XN 2.750“ @ 4714’ 3.813“ ID (Opens down) 7 5/8“ 29.7# L-80 IBT-M casing ( drift ID = 6.75”, cap = .0262 BPF w/ tbg. ) 4.5“ 12.6# L-80 IBT-M tubing ( ID = 3.958”, cap = .0152 BPF ) 3.5“, 9.2# L-80 NSCT tubing ( ID = 2.992”, cap = .0087 BPF ) (3955‘ tvd) (3890‘ tvd) “Reverse Circulation” Jet Pump Configuration Power FluidPower Fluid Reservoir FluidSliding Sleeve BodySliding Sleeve Max hole angle in tubing =73 degree67 degrees at sleeve 10 3/4“ 45.5# L-80 BTRC casing 2704‘ 10' Patch, Minimum I.D. = 2.45" (5/2/13) Length is 23.51' Perforation Summary Size SPF Intervals Opn/ Sqz Data 2" 6 7780'-7810' O 12/4/12 2" 6 7860'-7890' O 12/4/12 4047.6' to 4071.1' Nipple Reducer With 2.313" profile 4/16/13 Reservoir Abandonment Well: MPU S-24 06/03/2021 COIL BOPE Valve, Swab, WKM-M, 4 1/16 5M FE Valve, Upper Master, Baker, 4 1/16 5M FE, w/ Hydraulic END 2-02 30 X 20 X 13д X 9з X 7 X 4 ½ Coil Tubing BOP Valve, Lower Master, WKM-M, 4 1/16 5M FE Blind/Shear Blind/Shear Lubricator to injection head 4 1/16 10M Slip Slip Blind/Shear Blind/Shear Pipe Pipe Manual Gate 2 1/8 5M 2д" Single Stripper Crossover spool 4 1/16 10M X 4 1/16 5M Manual Gate 2 1/8 5M Tubing Adapter, 4 1/16 5M Pump-In Sub 4 1/16 5M 1502 Union STANDARD WELL PROCEDURE NITROGEN OPERATIONS 12/08/2015 FINAL v1 Page 1 of 1 1.) MIRU Nitrogen Pumping Unit and Liquid Nitrogen Transport. 2.) Notify Pad Operator of upcoming Nitrogen operations. 3.) Perform Pre-Job Safety Meeting. Review Nitrogen vendor standard operating procedures and appropriate Safety Data Sheets (formerly MSDS). 4.) Document hazards and mitigation measures and confirm flow paths. Include review on asphyxiation caused by nitrogen displacing oxygen. Mitigation measures include appropriate routing of flowlines, adequate venting and atmospheric monitoring. 5.) Spot Pumping Unit and Transport. Confirm liquid N2 volumes in transport. 6.) Rig up lines from the Nitrogen Pumping Unit to the well and returns tank. Secure lines with whip checks. 7.) Place signs and placards warning of high pressure and nitrogen operations at areas where Nitrogen may accumulate or be released. 8.) Place pressure gauges downstream of liquid and nitrogen pumps to adequately measure tubing and casing pressures. 9.) Place pressure gauges upstream and downstream of any check valves. 10.) Wellsite Manager shall walk down valve alignments and ensure valve position is correct. 11.) Ensure portable 4-gas detection equipment is onsite, calibrated, and bump tested properly to detect LEL/H2S/CO2/O2 levels. Ensure Nitrogen vendor has a working and calibrated detector as well that measures O2 levels. 12.) Pressure test lines upstream of well to approved sundry pressure or MPSP (Maximum Potential Surface Pressure), whichever is higher. Test lines downstream of well (from well to returns tank) to 1,500 psi. Perform visual inspection for any leaks. 13.) Bleed off test pressure and prepare for pumping nitrogen. 14.) Pump nitrogen at desired rate, monitoring rate (SCFM) and pressure (PSI). All nitrogen returns are to be routed to the returns tank. 15.) When final nitrogen volume has been achieved, isolate well from Nitrogen Pumping Unit and bleed down lines between well and Nitrogen Pumping Unit. 16.) Once you have confirmed lines are bled down, no trapped pressure exists, and no nitrogen has accumulated begin rig down of lines from the Nitrogen Pumping Unit. 17.) Finalize job log and discuss operations with Wellsite Manager. Document any lessons learned and confirm final rates/pressure/volumes of the job and remaining nitrogen in the transport. 18.) RDMO Nitrogen Pumping Unit and Liquid Nitrogen Transport. STANDARD WELL PROCEDURE NITROGEN OPERATIONS 12/08/2015 FINAL v1 Page 1 of 1 1.) MIRU Nitrogen Pumping Unit and Liquid Nitrogen Transport. 2.) Notify Pad Operator of upcoming Nitrogen operations. 3.) Perform Pre-Job Safety Meeting. Review Nitrogen vendor standard operating procedures and appropriate Safety Data Sheets (formerly MSDS). 4.) Document hazards and mitigation measures and confirm flow paths. Include review on asphyxiation caused by nitrogen displacing oxygen. Mitigation measures include appropriate routing of flowlines, adequate venting and atmospheric monitoring. 5.) Spot Pumping Unit and Transport. Confirm liquid N2 volumes in transport. 6.) Rig up lines from the Nitrogen Pumping Unit to the well and returns tank. Secure lines with whip checks. 7.) Place signs and placards warning of high pressure and nitrogen operations at areas where Nitrogen may accumulate or be released. 8.) Place pressure gauges downstream of liquid and nitrogen pumps to adequately measure tubing and casing pressures. 9.) Place pressure gauges upstream and downstream of any check valves. 10.) Wellsite Manager shall walk down valve alignments and ensure valve position is correct. 11.) Ensure portable 4-gas detection equipment is onsite, calibrated, and bump tested properly to detect LEL/H2S/CO2/O2 levels. Ensure Nitrogen vendor has a working and calibrated detector as well that measures O2 levels. 12.) Pressure test lines upstream of well to approved sundry pressure or MPSP (Maximum Potential Surface Pressure), whichever is higher. Test lines downstream of well (from well to returns tank) to 1,500 psi. Perform visual inspection for any leaks. 13.) Bleed off test pressure and prepare for pumping nitrogen. 14.) Pump nitrogen at desired rate, monitoring rate (SCFM) and pressure (PSI). All nitrogen returns are to be routed to the returns tank. 15.) When final nitrogen volume has been achieved, isolate well from Nitrogen Pumping Unit and bleed down lines between well and Nitrogen Pumping Unit. 16.) Once you have confirmed lines are bled down, no trapped pressure exists, and no nitrogen has accumulated begin rig down of lines from the Nitrogen Pumping Unit. 17.) Finalize job log and discuss operations with Wellsite Manager. Document any lessons learned and confirm final rates/pressure/volumes of the job and remaining nitrogen in the transport. 18.) RDMO Nitrogen Pumping Unit and Liquid Nitrogen Transport. LEGEND:Fluids Pumped Valve Open Gate Valve 500 BBL KILL TANKChoke ManifoldP400 BBL UPRIGHTOpenVBRBLINDCOIL PUMP400 BBL UPRIGHTOpenClosedOpenOpenOpenOpenOpenOpenOpenPSWFOFRRE50 BBL FREEZEPROTECT TANKSWFOFRRETo FlowlineNITROGEN PUMP & TANPCOIL UNIT WITH 1.5” to 2.0” COIL400 BBL UPRIGHTSEAWATERW/DEFOAMERTRIPLEX • 'E CEIVED STATE OF ALASKA MAY 292013 ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCC REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon U Repair Well U • Plug Perforations U Perforate ❑ OtherU Performed: Alter Casing ❑ Pull TubinE1 Stimulate - Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended WeC] 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc • • Developmertel ' Exploratory ❑ 203 -038 -0 ' 3. Address: P.O. Box 196612 Stratigraphid Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 23142 -00 -00 • 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0380109 SBL MPS -24 . 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted MILNE POINT, SCHRADER BLFF OIL - 11. Present Well Condition Summary: Total Depth measured 8205 feet ' Plugs measured None feet true vertical 3890 feet Junk measured None feet Effective Depth measured 8205 feet • Packer measured See Attachment feet true vertical 3890.28 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 91.5# H -40 33 - 113 33 - 113 1490 470 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate None None None None None None Production 4991 7 -5/8" 29.7# L -80 31 - 5022 31 - 4035.27 6890 4790 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth See Attachment feet True Vertical depth See Attachment feet Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): SCANNED JUN 0 4 2013 Treatment descriptions including volumes used and final pressure: 1 � 6 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 84 6 401 3203 228 Subsequent to operation: 0 0 0 0 0 14. Attachments: * 15. Well Class after work: Copies of Logs and Surveys Run Exploratorf❑ Development 0 • Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil El . Gas ❑ WDSPI.❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCO 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Email Nita.Summerhays @BP.com Printed Name Nita Summerhays Title Petrotechnical Data Technician 1 .cam Signat rz o� vii is _ � Phone 564 4035 Date 5/28/2013 Re e 0/2012 Form 10 -404 Revised 10/2012 v� - � RB� � IM ' MAY 2 9 2016 01 Submit Original Only • • Dail Report of Well Operations Y P p ADL0380109 ACTIVITYDATE I SUMMARY ®= e l s• s 1 e , SET BAKER 4.5" KB PATCH @ 4049' - 4065', ELEMENT TO ELEMENT. TOP OF PATCH @ 4047.6 (PATCH SPECS = 3.70" MAX O.D., 23.51' OAL, 2.45" MIN I.D.) POOH AND RIG DOWN EQUIPMENT. FINAL T /I /O = 1000/900/0 PSI 5/2/2013 ** *JOB COMPLETE, WELL SHUT IN ON DEPARTURE, DSO NOTIFIED. * ** FLUIDS PUMPED BBLS 1 DIESEL 1 TOTAL Perforation Attachment ADL0380109 SW Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base TVD Depth Top TVD Depth Base MPS -24 5/31/2012 BPS 4951.23 4988.3 4037.81 4037.25 MPS -24 5/31/2012 BPS 5027.55 5064.62 4034.96 4033.07 MPS -24 5/31/2012 BPS 5107.25 5144.33 4031.25 4029.56 MPS -24 5/31/2012 BPS 5186.97 5224.04 4027.02 4024.51 MPS -24 5/31/2012 BPS 5265.43 5302.51 4021.49 4018.64 MPS -24 5/31/2012 BPS 5337.03 5374.09 4016.05 4013.54 MPS -24 5/31/2012 BPS 5538.55 5575.63 4008.6 4009.74 • MPS -24 5/31/2012 BPS 5616.99 5654.05 4011 4011.35 MPS -24 5/31/2012 BPS 5695.93 5733.01 4010.79 4010.38 MPS -24 5/31/2012 BPS 5769.56 5806.64 4010.7 4010.78 MPS -24 5/31/2012 BPS 5849.31 5886.38 4010.93 4011.3 MPS -24 5/31/2012 BPS 5928.73 5965.79 4011.88 4012.13 MPS -24 5/31/2012 BPS 6006.68 6043.76 4011.09 4009.71 MPS -24 5/31/2012 BPS 6085.32 6121.75 4008.3 4007.59 MPS -24 5/31/2012 BPS 6163.15 6200.07 4007.19 4006.32 MPS -24 5/31/2012 BPS 6240.56 6277.65 4005.48 4004.62 MPS -24 5/31/2012 BPS 6319.94 6357.01 4003.76 4002.97 MPS -24 5/31/2012 BPS 6394.68 6431.77 4001.25 3999.97 MPS -24 5/31/2012 BPS 6471.67 6508.74 3999.62 4000.35 MPS -24 5/31/2012 BPS 6549.66 6586.73 4000.64 4000.99 MPS -24 5/31/2012 BPS 6628.52 6665.59 4002.44 4001.93 MPS -24 5/31/2012 BPS 6702.03 6738.9 4000.3 3998.68 . MPS -24 5/31/2012 BPS 6780.3 6817.38 3996.92 3995.29 MPS -24 5/31/2012 BPS 6860.03 6897.13 3992.72 3990.19 MPS -24 5/31/2012 BPS 6931.44 6968.34 3987.82 3984.87 MPS -24 5/31/2012 BPS 7006.94 7044.05 3981.18 3977.29 MPS -24 5/31/2012 BPS 7086.66 7123.48 3973.12 3970.24 MPS -24 5/31/2012 BPS 7163.52 7200.6 3967.43 3965.03 MPS -24 5/31/2012 BPS 7242.02 7279.11 3962.29 3960.83 MPS -24 5/31/2012 BPS 7321.16 7358.22 3960.45 3960.31 MPS -24 5/31/2012 BPS 7399.36 7436.44 3960.77 3961.44 MPS -24 5/31/2012 BPS 7474.33 7511.05 3961.03 3959.5 1 MPS -24 5/31/2012 BPS 7552.77 7589.83 3957.28 3954.65 MPS -24 5/31/2012 BPS 7628.15 7665.24 3951.27 3948.18 MPS -24 5/31/2012 BPS 7707.55 7744.63 3944.85 3941.47 MPS -24 12/4/2012 BPS 7776.62 7780 3938.13 3937.78 MPS -24 12/4/2012 APF 7780 7810 3937.78 3934.77 MPS -24 12/4/2012 BPS 7810 7813.69 3934.77 3934.41 MPS -24 12/4/2012 BPS 7856.37 7860 3930.24 3929.88 MPS -24 12/4/2012 APF 7860 7890 3929.88 3926.92 MPS -24 12/4/2012 BPS 7890 7893.46 3926.92 3926.58 MPS -24 5/31/2012 BPS 7935.84 7972.93 3922.59 3919.22 • MPS -24 5/31/2012 BPS 8010.47 8047.55 3915.62 3911.46 MPS -24 5/31/2012 BPS 8087.33 8124.4 3906.34 3901.39 • 1 Casing / Tubing Attachment ADL0380109 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 91.5# H -40 33 - 113 33 - 113 1490 470 LINER 48 3 -1/2" 9.2# L -80 4671 - 4719 3968.12 - 3985.06 10160 10530 LINER 3396 4" 9.5# L -80 4765 - 8161 3999.92 - 3896.35 7910 6590 PRODUCTION 4991 7 -5/8" 29.7# L -80 31 - 5022 31 - 4035.27 6890 4790 SURFACE 2672 10 -3/4" 45.5# L -80 32 - 2704 32 - 2575.24 5210 2480 SURFACE 2672 10 -3/4" 45.5# L -80 32 - 2704 32 - 2575.24 5210 2480 TUBING 4641 4 -1/2" 12.6# L -80 30 - 4671 30 - 3968.12 8430 7500 • TUBING 11 3 -1/2" 9.2# L -80 4051 - 4062 3647.89 - 3655.08 10160 10530 • i • Packers and SSV's Attachment ADL0380109 SW Name Type MD TVD Depscription MPS -24 PACKER 4051 3575.44 3 -1/2" Baker KB Top Packer MPS -24 PACKER 4062 3582.63 3 -1/2" Baker KB Top Packer MPS -24 PACKER 4765 3927.47 4 -1/2" Baker ZXP Packer j MPS -24 PACKER 7664 3875.82 4 -1/2" Baker Premier Packer Tree: 4- 1/16" - 5M FMC '! MPS -24 F elev. = 71.90' (Doyon 14) Wellhead: 11" x 4.5" 5M Gen 6 GL. elev.= 33.85' (Doyon 14) w/ 4.5" TCII T &B Tubing Hanger - CIW "H" BPV profile IL KOP @ 550' 20" x 34" insulated, 215 #/ft A -53 112` +50 degrees @ 4100' 11:111 Max hole angle in tubing = 73 degree 67 degrees at sleeve Camco 4.5" x 1" w/ BK latch 2102' sidepocket KGB -2 GLM 10 3/4" 45.5# L -80 BTRC casing 2704' 4 7 5/8" 29.7# L -80 IBT -M casing ( drift ID = 6.75 ", cap = .0262 BPF w/ tbg.) Min. ID through tubing 2.450" @ 4051' Min. ID through XN 2.750" @ 4714' 4.5" 12.6# L -80 IBT -M tubing ( ID = 3.958", cap = .0152 BPF) 10' Patch, Minimum 4047.6' to 4071.1' 3.5 ", 9.2# L -80 NSCT tubing I.D. = 2.45" (5/2/13) ( ID = 2.992 ", cap = .0087 BPF ) Length is 23.51' Phoenix Discharge gauge (3.850" id) [ 4603' 'Reverse Circulation' Jet Pump Configuration `_ __ f Nipple Reducer With 2.313" profile 4/16/13) pd f 1 ,,, - 4.5" HES "XD" Dura sliding sleeve 4614` LL p r�y } o. *0 3.813" ID (Opens down) I I 1 Phoenix Jet Pum p gauge sensor L4637' NOTE: ID change min. 2.840" (3955' tvd) L11:637' 4.5" x 3.5" X -Over 4651' � t H I r (L[ I - I 3.5" x 4.5" X -Over 4662' CI 7 5/8" x 4.5" Baker S -3 PKR. 3.875" ID 4664' I ( 4.5" x 3.5" X -Over 4671' R Betio, F d • I 3.5" HES XN- Nipple (2.750" No Go) 4714' Perforation Summary WLEG 4719' Size SPF Intervals Opn/ Sqz Data 2" 6 7780' -7810' 0 12/4/12 2" 6 7860' -7890' 0 12/4/12 Baker ZXP Liner Top Packer 4765' Baker 7 5/8" x 5 1/2" HMC Liner Hanger 4778' A 7 5/8" HES Float Collar 4942' 6 1/8" Hole td @ 8205' (3890' tvd) 7 5/8" HES Float Shoe 5022' NB Sands Lateral 43 its - 4 ", 9.5 # /ft. Screens & Blank Jts 0' \......... L -80 IBT (4951' - 8161') Rat hole Btm. Baker 4 1/2" Guide Shoe 8205' DATE REV. BY COMMENTS M I LN E POINT UNIT 4/26/03 Lee Hulme Drilled and completed by Doyon 14 WELL S-24 10/22/12 B. Bixby Update Patch set 12/4/12 B. Bixby Add Perfs API NO: 50- 029 - 23142 -00 05/04/2013 B. Bixby Update Patch set / Nipple Reducer BP EXPLORATION (AK) • STATE OF ALASKA • AKA OIL AND GAS CONSERVATION COMAON " . - 1 REPORT OF SUNDRY WELL OPERATIONS r' , -y: ,. 1. Operations Abandon U Repair Well U Plug Perforations U Perforate U Other U Sand Consolidation Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended Well❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: BP Exploration (Alaska), Inc Development El Exploratory ❑ "• 203 -038 -0 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 23142 -00 -00 7. Property Designation (Lease Number): 8. Well Name and Number: r ADL0380109 - SBL MPS -24 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted MILNE POINT, SCHRADER BLFF OIL 11. Present Well Condition Summary: Total Depth measured 8205 feet Plugs measured None feet true vertical 3890 feet Junk measured None feet Effective Depth measured 8205 feet Packer measured See Attachment feet true vertical 3890.28 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 91.5# H-40 33 - 113 33 - 113 1490 470 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate None None None None None None Production 4991 7 -5/8" 29.7# L -80 31 - 5022 31 - 4035.27 6890 4790 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth See Attachment feet SCANNEV APR 16 2U13 True Vertical depth See Attachment feet Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None • • -•- None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 84 6 401 3203 228 Subsequent to operation: 0 0 0 0 0 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Explorator10 Development El - Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: . Oil 0 Gas ❑ WDSPL❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Email Nita.Summerh Printed Name Nita Summerhays Title Petrotechnical Data Technician .74 _._ / Signatur yezeozw jam ,, . \ Phone 564 -4035 Date 4/3/2013 iVA bMS APR 0 4 9� " 1 . 10130 4 /e/Ii3 Form 10 -404 Revised 10/2012 Submit Original Only • Daily Report of Well Operations ADL0380109 �.- SUMMARY pumpe. • • s nea meth, .. s cru•e 'own u •rng to • isp ace an. pe orm s ep rate test, Increased rate at .1 bpm increments and held for 5 minutes, starting at .6 bprn and working up to 1.5 bpm before reaching max pressure of 1600 psi. During test, Tubing pressure climbed from 1250 psi to 1600 psi. No visable pressure breakover observed during pumping * *Swab, Wing, SSV= closed. Master, IA, OA= open on departure ** 3/11/2013 FWHP's= 785/0/56 •_:: I an. onso i•a ion rea men •ig o : . •ump .. s nea me followed by 712 bbls dead crude down TBG not to exceed 1600 Psi. RDMO. FWHP= 1110/0/147. wing =shut / ssv =shut / swab =shut / master =open IA and OA open to gauges 3/13/2013 Operator notified of departure. • = : • I : an. onso i. a on rea men • 1g o . • ump :.. s • ie:se Treatment chemicals down TBG not to exceed 1600 Psi. Swap to dead crude and pump 114 bbls down TBG. RDMO / FWHP= 987/0/86 wing =shut / SSV =shut / swab =shut / 3/14/2013 master =shut / IA and OA open to gauges. Operator notified of departure. 3/14/2013 'ea ranspo o .s o • I or an. onso 1.a ion • rojec FLUIDS PUMPED BBLS 10 METH 339 CRUDE 712 DIESEL 178 DIESEL / CHEMICAL 1239 TOTAL • • Perforation Attachment ADL0380109 Perf Operation 1 SW Name Operation Date Code Meas Depth Top _ Meas Depth Base TVD Depth Top TVD Depth Base MPS -24 4/25/2003 SL 4951.23 4988.3 4037.81 4037.25 MPS -24 4/25/2003 SL 5027.55 5064.62 4034.96 4033.07 MPS -24 4/25/2003 SL 5107.25 5144.33 4031.25 4029.56 MPS -24 4/25/2003 SL 5186.97 5224.04 4027.02 4024.51 MPS -24 4/25/2003 SL 5265.43 _ 5302.51 4021.49 4018.64 MPS -24 4/25/2003 SL 5337.03 5374.09 4016.05 4013.54 MPS -24 4/25/2003 SL 5538.55 5575.63 4008.6 4009.74 MPS -24 4/25/2003 SL 5616.99 5654.05 4011 4011.35 MPS -24 4/25/2003 SL 5695.93 5733.01 4010.79 4010.38 MPS -24 4/25/2003 SL 5769.56 5806.64 4010.7 4010.78 MPS -24 4/25/2003 SL 5849.31 5886.38 4010.93 4011.3 MPS -24 4/25/2003 SL 5928.73 5965.79 4011.88 4012.13 MPS -24 4/25/2003 SL 6006.68 6043.76 4011.09 4009.71 MPS -24 4/25/2003 SL 6085.32 6121.75 4008.3 4007.59 MPS -24 4/25/2003 SL 6163.15 6200.07 4007.19 4006.32 MPS -24 4/25/2003 SL 6240.56 6277.65 4005.48 4004.62 MPS -24 4/25/2003 SL 6319.94 6357.01 4003.76 4002.97 MPS -24 4/25/2003 SL 6394.68 6431.77 4001.25 3999.97 MPS -24 4/25/2003 SL 6471.67 6508.74 3999.62 4000.35 MPS -24 4/25/2003 SL 6549.66 _ 6586.73 4000.64 4000.99 MPS -24 4/25/2003 SL 6628.52 6665.59 4002.44 4001.93 MPS -24 4/25/2003 SL 6702.03 6738.9 4000.3 3998.68 MPS -24 4/25/2003 SL 6780.3 6817.38 3996.92 3995.29 MPS -24 4/25/2003 SL 6860.03 6897.13 3992.72 3990.19 MPS -24 4/25/2003 SL 6931.44 6968.34 3987.82 3984.87 MPS -24 4/25/2003 SL 7006.94 7044.05 3981.18 3977.29 MPS -24 4/25/2003 SL 7086.66 7123.48 3973.12 3970.24 MPS -24 4/25/2003 SL 7163.52 7200.6 3967.43 3965.03 MPS -24 4/25/2003 SL 7242.02 7279.11 3962.29 3960.83 MPS -24 4/25/2003 SL 7321.16 7358.22 3960.45 3960.31 MPS -24 4/25/2003 SL 7399.36 7436.44 3960.77 3961.44 MPS -24 4/25/2003 SL 7474.33 7511.05 3961.03 3959.5 MPS -24 4/25/2003 SL 7552.77 _ 7589.83 3957.28 3954.65 MPS -24 4/25/2003 SL 7628.15 7665.24 3951.27 3948.18 MPS -24 4/25/2003 SL _ 7707.55 7744.63 3944.85 3941.47 MPS -24 12/4/2012 SL 7776.62 7780 3938.13 3937.78 MPS -24 12/4/2012 APF 7780 7810 3937.78 3934.77 MPS -24 12/4/2012 SL 7810 7813.69 3934.77 3934.41 MPS -24 12/4/2012 SL 7856.37 7860 3930.24 3929.88 MPS -24 12/4/2012 APF 7860 7890 3929.88 3926.92 MPS -24 12/4/2012 SL 7890 7893.46 3926.92 3926.58 MPS -24 4/25/2003 SL 7935.84 7972.93 3922.59 3919.22 MPS -24 4/25/2003 SL 8010.47 8047.55 3915.62 3911.46 MPS -24 4/25/2003 SL 8087.33 8124.4 3906.34 3901.39 Casing / Tubing Attachment ADL0380109 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 91.5# H -40 33 - 113 33 - 113 1490 470 LINER 48 3 -1/2" 9.2# L -80 4671 - 4719 3968.12 - 3985.06 10160 10530 LINER 3396 4" 9.5# L -80 4765 - 8161 3999.92 - 3896.35 7910 6590 PRODUCTION 4991 7 -5/8" 29.7# L -80 31 - 5022 31 - 4035.27 6890 4790 SURFACE 2672 10 -3/4" 45.5# L -80 32 - 2704 32 - 2575.24 5210 2480 SURFACE 2672 10 -3/4" 45.5# L -80 32 - 2704 32 - 2575.24 5210 2480 TUBING 4641 4 -1/2" 12.6# L -80 30 - 4671 30 - 3968.12 8430 7500 • TUBING 11 3 -1/2" 9.2# L -80 4051 - 4062 3647.89 - 3655.08 10160 10530 • • • I Packers and SSV's Attachment ADL0380109 SW Name Type MD TVD Depscription MPS -24 PACKER 4051 3575.44 3 -1/2" Baker KB Top Packer MPS -24 PACKER 4062 3582.63 3 -1/2" Baker KB Top Packer MPS -24 PACKER 4765 3927.47 4 -1/2" Baker ZXP Packer MPS -24 PACKER 7664 3875.82 4 -1/2" Baker Premier Packer v Tree: 4-1/16" - 5M FMC MPS -24 0 elev. = 71.90' (Doyon 14) Wellhead: 11" x 4.5" 5M Ge GL. elev.= 33.85' (Doyon 14) w/ 4.5" TCII T &B Tubing Hanger - CIW "H" BPV profile lk KOP @ 550' 20" x 34" insulated, 215 #/ft A -53 112' +50 degrees @ 4100' Max hole angle in tubing = 73 degree 67 degrees at sleeve Camco 4.5" x 1" w/ BK latch 2102' sidepocket KGB -2 GLM 10 3/4" 45.5# L -80 BTRC casing I 2704' 4 ■ 7 5/8" 29.7# L -80 IBT -M casing ( drift ID = 6.75 ", cap = .0262 BPF w/ tbg. ) Min. ID through tubing 2.450" @ 4051' Min. ID through XN 2.750" @ 4714' 4.5" 12.6# L -80 IBT -M tubing ( ID = 3.958", cap = .0152 BPF) 0 10' Patch, Minimum 1 4051' 3.5 ", 9.2# L -80 NSCT tubing I.D. = 2.45" (10/21/12) ( ID = 2.992", cap = .0087 BPF ) Phoenix Discharge gauge (3.850" id) 1 4603' Reverse Circulation' Jet Pump Configuration PrMU:wi fluty 2 4.5" HES "XD" Dura sliding sleeve 4614' 3 , t .7.1 . 3.813" ID (Opens down) Phoenix Jet Pump gauge sensor 4637' NOTE: ID change min. 2.840" (3955' tvd) '-) 1 is (-- — 4.5 "x3.5 "X -Over 4651' I f . I i � 3.5" x 4.5" X -Over 4662' f ° 7 5/8" x 4.5" Baker S 3 PKR. 3.875" ID 4664 momoigionlimminnis 4.5" x 3.5" X -Over 4671' Pesery "rz Fl v 3.5" HES XN - Nipple (2 .750" No Go) 4714' Perforation Summary WLEG 4719' Size SPF Intervals Opn/ Sqz Data 2" 6 7780' -7810' 0 12/4/12 2" 6 7860' -7890' 0 12/4/12 Baker ZXP Liner Top Packer 4765' Baker 7 5/8" x 5 1/2" HMC Liner Hanger 4778' I A 7 5/8" HES Float Collar 4942' 6 1/8" Hole td @ 8205' (3890' tvd) 7 5/8" HES Float Shoe 5022' NB Sands Lateral 43 jts - 4 ", 9.5 # /ft. Screens & Blank Jts o' L -80 IBT (4951' - 8161') Rat hole LZIMIEZI =EMI Btm. Baker 4 1/2" Guide Shoe 8205' DATE REV. BY COMMENTS MI LN E POINT UNIT 4/26/03 Lee Hulme Drilled and completed by Doyon 14 WELL S -24 10/22/12 B. Bixby Update Patch set API NO: 50- 029 - 23142 -00 12/4/12 B. Bixby Add Perfs BP EXPLORATION (AK) , STATE OF ALASKA RECEIVED Air OIL AND GAS CONSERVATION COMM N JAN 0 3 2013 ` RE OF SUNDRY WELL OPER O NS 1. Operations Abandon U Repair Well U Plug Perforations U Perforate U Other U AOGCC Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time ExtensionD Change Approved Program ❑ Operat. ShutdownE Stimulate - Other ❑ Re -enter Suspended Well❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Develo ment Exploratory ❑ p Q p r 203 -038 -0 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 23142 -00 -00 7. Property Designation (Lease Number): 8. Well Name and Number: -, ADL0380109 SBL MPS -24 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): — To Be Submitted MILNE POINT, SCHRADER BLFF OIL 11. Present Well Condition Summary: Total Depth measured 8205 feet Plugs measured None feet true vertical 3890 feet Junk measured None feet Effective Depth measured 8205 feet Packer measured See Attachment feet true vertical 3890.28 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 91.5# H -40 33 - 113 33 - 113 1490 470 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate None None None None None None Production 4991 7 -5/8" 29.7# L -80 31 - 5022 31 - 4035.27 6890 4790 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth See Attachment feet SCANNED JAN 1 6 2 013 True Vertical depth See Attachment feet Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV (type, measured and true vertical depth) See Attachment Seeptichme4t__ . . , ,See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 84 6 401 3203 228 Subsequent to operation: 0 0 0 0 0 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development s ^ Service L] Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil 0 Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUC-❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Garry Catron Email Gar ry . Ca tron ( a�BP.Com Printed Name Garry Catron Title PDC PE Signature it CV Phone 564 -4424 Date 1/2/2013 RBDMS JAN 0 4 2013 /- 71-5 Form 10 -404 Revised 10/2012 / Submit Original Only • • Packers and SSV's Attachment ADL0380109 SW Name Type MD TVD Depscription MPS -24 PACKER 4051 3575.44 3 -1/2" Baker KB Top Packer MPS -24 PACKER 4062 3582.63 3 -1/2" Baker KB Top Packer MPS -24 PACKER 4765 3927.47 4 -1/2" Baker ZXP Packer MPS -24 PACKER 7664 3875.82 4 -1/2" Baker Premier Packer Casing / Tubing Attachment ADL0380109 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 91.5# H-40 33 - 113 33 - 113 1490 470 LINER 48 3 -1/2" 9.2# L -80 4671 - 4719 3968.12 - 3985.06 10160 10530 LINER 3396 4" 9.5# L -80 4765 - 8161 3999.92 - 3896.35 7910 6590 PRODUCTION 4991 7 -5/8" 29.7# L -80 31 - 5022 31 - 4035.27 6890 4790 SURFACE 2672 10 -3/4" 45.5# L -80 32 - 2704 32 - 2575.24 5210 2480 SURFACE 2672 10 -3/4" 45.5# L -80 32 - 2704 32 - 2575.24 5210 2480 TUBING 4641 4 -1/2" 12.6# L -80 30 - 4671 30 - 3968.12 8430 7500 • TUBING 11 3 -1/2" 9.2# L -80 4051 - 4062 3647.89 - 3655.08 10160 10530 • • • Perforation Attachment ADL0380109 Operation Perf Operation SW Name Date Code Meas Depth Top Meas Depth Base TVD Depth Top TVD Depth Base MPS -24 4/25/2003 SL 4951.23 4988.3 4037.81 4037.25 MPS -24 4/25/2003 SL 5027.55 5064.62 4034.96 4033.07 MPS -24 4/25/2003 SL 5107.25 5144.33 4031.25 4029.56 MPS -24 4/25/2003 SL 5186.97 5224.04 4027.02 4024.51 MPS -24 4/25/2003 SL 5265.43 5302.51 4021.49 4018.64 MPS -24 4/25/2003 SL 5337.03 5374.09 4016.05 4013.54 MPS -24 4/25/2003 SL 5538.55 5575.63 4008.6 4009.74 MPS -24 4/25/2003 SL 5616.99 5654.05 4011 4011.35 MPS -24 4/25/2003 SL 5695.93 5733.01 4010.79 4010.38 MPS -24 4/25/2003 SL 5769.56 5806.64 4010.7 4010.78 MPS -24 4/25/2003 SL 5849.31 5886.38 4010.93 4011.3 MPS -24 4/25/2003 SL 5928.73 5965.79 4011.88 4012.13 MPS -24 4/25/2003 SL 6006.68 6043.76 4011.09 4009.71 MPS -24 4/25/2003 SL 6085.32 6121.75 4008.3 4007.59 MPS -24 4/25/2003 SL 6163.15 6200.07 4007.19 4006.32 MPS -24 4/25/2003 SL 6240.56 6277.65 4005.48 4004.62 MPS -24 4/25/2003 SL 6319.94 6357.01 4003.76 4002.97 MPS -24 4/25/2003 SL 6394.68 6431.77 4001.25 3999.97 MPS -24 4/25/2003 SL 6471.67 6508.74 3999.62 4000.35 MPS -24 4/25/2003 SL 6549.66 6586.73 4000.64 4000.99 MPS -24 4/25/2003 SL 6628.52 6665.59 4002.44 4001.93 MPS -24 4/25/2003 SL 6702.03 6738.9 4000.3 3998.68 MPS -24 4/25/2003 SL 6780.3 6817.38 3996.92 3995.29 MPS -24 4/25/2003 SL 6860.03 6897.13 3992.72 3990.19 MPS -24 4/25/2003 SL 6931.44 6968.34 3987.82 3984.87 MPS -24 4/25/2003 SL 7006.94 7044.05 3981.18 3977.29 MPS -24 4/25/2003 SL 7086.66 7123.48 3973.12 3970.24 MPS -24 4/25/2003 SL 7163.52 7200.6 3967.43 3965.03 MPS -24 4/25/2003 SL 7242.02 7279.11 3962.29 3960.83 MPS -24 4/25/2003 SL 7321.16 7358.22 3960.45 3960.31 MPS -24 4/25/2003 SL 7399.36 7436.44 3960.77 3961.44 1 MPS -24 4/25/2003 SL 7474.33 7511.05 3961.03 3959.5 MPS -24 4/25/2003 SL 7552.77 7589.83 3957.28 3954.65 MPS -24 4/25/2003 SL 7628.15 7665.24 3951.27 3948.18 MPS -24 4/25/2003 SL 7707.55 7744.63 3944.85 3941.47 MPS -24 12/4/2012 SL 7776.62 7780 3938.13 3937.78 MPS -24 12/4/2012 APF 7780 7810 3937.78 3934.77 MPS -24 12/4/2012 SL 7810 7813.69 3934.77 3934.41 MPS -24 12/4/2012 SL 7856.37 7860 3930.24 3929.88 MPS -24 12/4/2012 APF 7860 7890 3929.88 3926.92 MPS -24 12/4/2012 SL 7890 7893.46 3926.92 3926.58 MPS -24 4/25/2003 SL 7935.84 7972.93 3922.59 3919.22 MPS -24 4/25/2003 SL 8010.47 8047.55 3915.62 3911.46 MPS -24 4/25/2003 SL 8087.33 8124.4 3906.34 3901.39 AB ABANDONED MIR MECHANICAL ISOLATED REMOVED APF ADD PERF MIS MECHANICAL ISOLATED BPP BRIDGE PLUG PULLED MLK LEAK • • BPS BRIDGE PLUG SET OH OPEN HOLE FCO OUT STC STRADDLE PACK, CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF 1 • • Daily Report of Well Operations ADL0380109 ACTIVITYDATE ' 1 ; w/ 1.75" CT. Job Scope: Nitrified , pe on inue rom WSR * ** Begin RU. Perform BOP test. MU /RIH with Weatherford MHA and 2.2" nozzle for dry tag. RIH at tag fill at 4945'. PUH and come online w/ N2 at 500scfm to establish 1:1 returns. 11/29/2012 ** *Job continued on 11/30/12 WSR * ** CTU #3 w/ 1.75" CT. Job Scope: Nitrified FCO, Addperf ** *Continued from 11/29/12 WSR * ** Adjusting N2 rate to establish 1:1 returns before starting FCO. 1:1 returns established at 550scfm w/ 1 bpm slick 1% KCI. RIH and begin cleaning out, tagged hard bridge at 4945' multiple times. Reduce N2 rate and increase slick 1% KCI rate and broke through hard fill. Jet down to 5558', started loosing returns, Increase N2 rate to 600 scf. Get well unloaded, resume FCO to 5862', cut N2 to 575 scf. FCO to 6017', returns down to 60 %, increase N2 back to 600 scf. Chasing every 3rd pill into TT. FCO to 6750' when a standing iron seal started leaking. Circulated BU to clear fill on backside and shutdown. Replaced seal and performed successful PT. RIH and dry tag at 8166'. PUH to 4700' and pump N2 at 600scfm to lift well for final gel sweep. 11/30/2012 ** *Job in progress. * ** CTU #3 w/ 1.75" CT. Job Scope: Nitrified FCO, Addperf ** *Continued from 11/30/12 WSR * ** RIH and pump final 15bbl gel sweep. Chased OOH at 80 %. to 3900', park circ bottoms up. SI well. RIH to 8180' (uncorrected CTM). Paint flag @ 8130', pooh, pump pipe displacement down coil w/ water /meth. Found out of spec pipe /below min wall @ buttweld @ 5205'. POOH. Blow down reel. Pump 5 bbl meth /wtr, 120 bbl 1% KCL, 28 bbl meth /wtr down backside. Injectivity is 3.3 bpm @ 289 psi WHP. Swap to 12/1/2012 reel swap WSR. Note - this job is incomplete. CTU #3 w/ 1.75" CT. Job Scope: Jewelry log, Addperf ** *Continued from 12/01/12 WSR * ** MIRU CTU w/ new 1.75" X 0.134" wall HS -80 pipe. Pump 1.25" ball through coil. MU /RIH w/ Weatherford MHA and PDS 2.2" carrier w/ 2.2" nozzle. Dry tag. TD @ 8194'. Log GR /CCL @ 50 fpm from 8194' -3900' w/ col flag @ 7750'. POOH. Processed good logging data, +2.5' correction (Tie -in to Liner Tally 24- April- 2003). Corrected PBTD 8203'. PT'd WFD MHA and identified a leak at the disconnect. Replaced disconnect and MU perf guns. RIH w/ 2" perf guns. 12/3/2012 ** *Job continued on 12/4/12 * ** CTU #3 w/ 1.75" CT. Job Scope: Addperf ** *Continued from 12/03/12 WSR * ** RIH w/ 2" perf guns. Correct depth to flag. Launch 1/2" alum ball and shoot 2" HJ2006 perf guns from 7860-7890'. POOH, all shots fired. MU 2nd 2 "x30' HJ2006 perf gun and RIH. Correct to flag depth. Launch 1/2" alum ball and shoot HJ2006 perf guns from 7780 - 7810'. POOH, all shots fired. Recover ball. RDMO. Well is freeze protected. 12/4/2012 ** *Job complete * ** • Tree: 4- 1/16" - 5M FMC Ori F elev. = 71.90' (Doyon 14) Wellhead: 11" x 4.5" 5M Gee MPS -24 t L. elev.= 33.85' (Doyon 14) w/ 4.5" TCII T &B Tubing Hanger CIW "H" BPV profile KOP @ 550' 20" x 34" insulated, 215 #/ft A -53 1 112` +50 degrees @ 4100' Max hole angle in tubing = 73 degree 67 degrees at sleeve Cameo 4.5" x 1" w/ BK latch 2102` ,v sidepocket KGB -2 GLM 10 3/4" 45.5# L -80 BTRC casing I 2704' 7 5/8" 29.7# L -80 IBT -M casing ( drift ID = 6.75 ", cap = .0262 BPF w/ tbg.) n. through tubing 4" 0 M ID ID through XN 2.72.50" @ 50 4714 451` ' 4.5" 12.6# L -80 IBT -M tubing ( ID = 3.958", cap = .0152 BPF) • 10' Patch, Minimum 1 4051' 3.5 ", 9.2# L -80 NSCT tubing I.D. = 2.45" (10/21/12) ( ID = 2.992 ", cap = .0087 BPF) r Phoenix Discharge gauge (3.850" id) 1 4603` "Reverse Circulation" Jet Pump Configuration Proium fluid ,g 4.5" 4.5" HES "XD" Dura sliding sleeve 4614' 3.813" ID (Opens down) - L Z' Phoenix Jet Pump gauge sensor 4637' I ` NOTE: ID change min. 2.840" (3955' tvd) I � 4.5" x 3.5" X -Over 4651' j Ih - I m 3.5" x 4.5" X -Over 1 4662' ibi t .__ N 7 5/8" x 4.5" Baker S -3 PKR. 3.875" ID 4664` II 4.5" x 3.5" X -Over 1 4671' Reservoir Fluid 3.5" HES XN- Nipple (2.750" No Go) 4714' Perforation Summary WLEG 4719' Size SPF Intervals Opn/ Sqz Data 2" 6 7780' -7810' 0 12/4/12 2" 6 7860' -7890' 0 12/4/12 Baker ZXP Liner Top Packer 4765' Baker 7 5/8" x 5 1/2" HMC Liner Hanger 4778' 1 7 5/8" HES Float Collar 4942` 6 1/8" Hole td @ 8205' (3890' tvd) 7 5/8" HES Float Shoe 5022' NB Sands Lateral 43 jts - 4", 9.5 # /ft. Screens & Blank Jts 0' L -80 IBT (4951' - 8161') Rat hole = 112227.111 I . Btm. Baker 4 1/2" Guide Shoe 8205' DATE REV. BY COMMENTS MILNE POINT UNIT 4/26/03 Lee Hulme Drilled and completed by Doyon 14 WELL S -24 10/22/12 B. Bixby Update Patch set API NO: 50- 029 - 23142 -00 12/4/12 B. Bixby Add Perfs BP EXPLORATION (AK) RECEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM! SION NOV 2 0 2012 REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon U Repair Well U Plug Perforations U Perforate U Other' ./Cµ b; n w fa, Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time ExtensionD Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended Well❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Na me: BP Exploration (Alaska), Inc Development IS Exploratory ❑ J 203 -038 -0 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 23142 -00 -00 7. Property Designation (Lease Number): 8. Well Name and Number: . ADL0380109 SBL MPS -24 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): — To Be Submitted MILNE POINT, SCHRADER BLFF OIL 11. Present Well Condition Summary: Total Depth measured 8205 feet Plugs measured None feet true vertical 3890 feet Junk measured None feet Effective Depth measured 8205 feet Packer measured See Attachment feet true vertical 3890.28 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20'91.5#I-$-40 33 - 113 33 - 113 1490 470 Surface 2672 10 -3/4" 45.5# L -80 32 - 2704 32 - 2575.24 ••■••yt}g." 2480 Intermediate None None None None None None Production 4991 7 -5/8" 29.7# L -80 31 - 5022 31 - 4035.27 6890 4790 Liner 3396 4" 9.5# L -80 4765 - 8161 3999.92 - 3896.35 7910 6590 Perforation depth Measured depth See Attachment feet True Vertical depth See Attachment feet SCANNED MAR 1 2013, Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 84 6 401 3203 228 Subsequent to operation: 0 0 0 0 0 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Explorator0 Development Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil — U Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUC❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Garry Catron Email Gar 11 Printed Name Garry Catron / Title PDC PE Signature �� C Phone 564 -4424 Date 11/20/2012 H.S. ?, d e r if(fie Form 10-404 Revised 10/2012 Submit Original Only • • Packers and SSV's Attachment ADL0380109 SW Name Type MD TVD Depscription MPS -24 PACKER 4051 3575.44 3 -1/2" Baker KB Top Packer MPS -24 PACKER 4062 3582.63 3 -1/2" Baker KB Top Packer MPS -24 PACKER 4765 3927.47 4 -1/2" Baker ZXP Packer MPS -24 PACKER 7664 3875.82 4 -1/2" Baker Premier Packer I Perforation Attachment ADL0380109 SW Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base TVD Depth Top TVD Depth Base MPS -24 4/25/2003 SL 4951 4988 4037.81 4037.25 MPS -24 4/25/2003 SL 5028 5065 4034.96 4033.07 MPS -24 4/25/2003 SL 5107 5144 4031.25 4029.56 MPS -24 4/25/2003 SL 5187 5224 4027.02 4024.51 MPS -24 4/25/2003 SL 5265 5303 4021.49 4018.64 MPS -24 4/25/2003 SL 5337 5374 4016.05 4013.54 MPS -24 4/25/2003 SL 5539 5576 4008.6 4009.74 • MPS -24 4/25/2003 SL 5617 5654 4011 4011.35 MPS -24 4/25/2003 SL 5696 5733 4010.79 4010.38 MPS -24 4/25/2003 SL 5770 5807 4010.7 4010.78 MPS -24 4/25/2003 SL 5849 5886 4010.93 4011.3 MPS -24 4/25/2003 SL 5929 5966 4011.88 4012.13 MPS -24 4/25/2003 SL 6007 6044 4011.09 4009.71 MPS -24 4/25/2003 SL 6085 6122 4008.3 4007.59 MPS -24 4/25/2003 SL 6163 6200 4007.19 4006.32 MPS -24 4/25/2003 SL 6241 6278 4005.48 4004.62 MPS -24 4/25/2003 SL 6320 6357 4003.76 4002.97 MPS -24 4/25/2003 SL 6395 6432 4001.25 3999.97 MPS -24 4/25/2003 SL 6472 6509 3999.62 4000.35 MPS -24 4/25/2003 SL 6550 6587 4000.64 4000.99 MPS -24 4/25/2003 SL 6629 6666 4002.44 4001.93 MPS -24 4/25/2003 SL 6702 6739 4000.3 3998.68 MPS -24 4/25/2003 SL 6780 6817 3996.92 3995.29 • MPS -24 4/25/2003 SL 6860 6897 3992.72 3990.19 MPS -24 4/25/2003 SL 6931 6968 3987.82 3984.87 MPS -24 4/25/2003 SL 7007 7044 3981.18 3977.29 MPS -24 4/25/2003 SL 7087 7123 3973.12 3970.24 MPS -24 4/25/2003 SL 7164 7201 3967.43 3965.03 il MPS -24 4/25/2003 SL 7242 7279 3962.29 3960.83 MPS -24 4/25/2003 SL 7321 7358 3960.45 3960.31 MPS -24 4/25/2003 SL 7399 7436 3960.77 3961.44 MPS -24 4/25/2003 SL 7474 7511 3961.03 3959.5 MPS -24 4/25/2003 SL 7553 7590 3957.28 3954.65 MPS -24 4/25/2003 SL 7628 7665 3951.27 3948.18 Perforation Attachment ADL0380109 MPS -24 4/25/2003 SL 7708 7745 3944.85 3941.47 MPS -24 4/25/2003 SL 7777 7814 3938.13 3934.41 MPS -24 4/25/2003 SL 7856 7893 3930.24 3926.58 MPS -24 4/25/2003 SL 7936 7973 3922.59 3919.22 MPS -24 4/25/2003 SL 8010 8048 3915.62 3911.46 MPS -24 4/25/2003 SL 8087 8124 3906.34 3901.39 AB ABANDONED MIR MECHANICAL ISOLATED REMOVED • APF ADD PERF MIS MECHANICAL ISOLATED BPP BRIDGE PLUG PULLED MLK MECHANICAL LEAK BPS BRIDGE PLUG SET OH OPEN HOLE FCO FILL CLEAN OUT STC STRADDLE PACK, CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF • Casing / Tubing Attachment ADL0380109 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 91.5# H -40 33 - 113 33 - 113 1490 470 LINER 3396 4" 9.5# L -80 4765 - 8161 3999.92 - 3896.35 7910 6590 PRODUCTION 4991 7 -5/8" 29.7# L -80 31 - 5022 31 - 4035.27 6890 4790 SURFACE 2672 10 -3/4" 45.5# L -80 32 - 2704 32 - 2575.24 5210 2480 TUBING 4641 4 -1/2" 12.6# L -80 30 - 4671 30 - 3968.12 8430 7500 PATCH 11 3 -1/2" 9.2# L -80 4051 - 4062 3647.89 - 3655.08 10160 10530 TUBING 48 3 -1/2" 9.2# L -80 4671 - 4719 3968.12 - 3985.06 10160 10530 • • Daily Report of Well Operations ADL0380109 ACTIVITYDATE SUMMARY * ** JOB CONTINUED FROM 20 -OCT -2012 * ** (ELINE: PATCH) RIH WITH 4 -1/2" BAKER PATCH. SETTING INTERVAL 4052- 4062FT. TOP OF PATCH= 4051 FT. CCL TO LOWER ELEMENT = 18.56FT. CCL STOP DEPTH = 4043.46FT. PATCH SET CONFIRMED FINAL T /I /O = 0/0/0 WELL SHUT IN ON DEPARTURE 10/21/2012 * ** JOB COMPLETED 21 -OCT -2012 * ** T /I /O = 20/0/0. MIT -IA PASSED to 1000 psi. (Test Tbg Patch) Pumped 10.2 bbls 60/40 down IA to reach test pressure. Loss of 36 psi 1st 15 min. Loss of 4 psi 2nd 15 min, for a total of 40psi in • 10/22/2012 30min. FWHP's = 20/0/0. • Tree: 4- 1/16" - 5M FMC a MPS -24 Or elev. = 71.90' (Doyon 14) Wellhead: 11" x 4.5" 5M Gen 6 On . GL. elev.= 33.85' (Doyon 14) w/ 4.5" TCII T &B Tubing Hanger CIW "H" BPV profile KOP @ 550' 20" x 34" insulated, 215 #/ft A -53 112` +50 degrees @ 4100' Max hole angle in tubing = 73 degree 67 degrees at sleeve Camco 4.5" x 1" w/ BK latch 2102' sidepocket KGB -2 GLM 10 3/4" 45.5# L -80 BTRC casing 1 2704' A 1. 7 5/8" 29.7# L -80 IBT -M casing ( drift ID = 6.75 ", cap = .0262 BPF w/ tbg.) Min. ID through tubing 2.840" @ 4637' Min. ID through XN 2.750" @ 4714' 4.5" 12.6# L -80 IBT -M tubing ( ID = 3.958", cap = .0152 BPF) _ 2 7 r- 10' Patch, Minimum 1 4051' I 3.5 ", 9.2# L -80 NSCT tubing 1 I.D. = 2.45" (10/21/12), ( ID = 2.992", cap = .0087 BPF) _ • L "-, - - - -- -.' f Phoenix Discharge gauge (3.850" id) 1 4603` `Reverse C rculation° Jet Pump Configuration rreduc„iMid r , • 4.5" HES "XD" Dura sliding sleeve 4614` i 1 ; 3.813" ID (Opens down) a° S ' a f :. - 1 Phoenix Jet Pump gauge sensor 1 4637` ' �,< NOTE: ID change min. 2.840" (3955` tvd) - ), I (--� %' 4.5" x 3.5" X -Over 4651' i .. '- m 3.5" x 4.5" X -Over 1 4662` li 7 5/8" x 4.5" Baker S -3 PKR. 3.875" ID 4664' II 4.5" x 3.5" X -Over 4671' Reservoir Fluid 3.5" HES XN- Nipple (2.750" NO Go) 4714' WLEG 4719' Baker ZXP Liner Top Packer 4765' Baker 7 5/8" x 5 1/2" HMC Liner Hanger 4778' A 7 5/8" HES Float Collar 4942' 6 1/8" Hole td @ 8205' (3890' tvd) 7 5/8" HES Float Shoe 5022' a NB Sands Lateral 43 jts - 4", 9.5 # /ft. Screens & Blank Jts 0' \ L -80 IBT (4951' - 8161') Rat hole L_ Btm. Baker 41 /2" Guide Shoe 8205' DATE REV. BY COMMENTS MILNE POINT UNIT UNIT 4/26/03 Lee Hulme Drilled and completed by Doyon 14 WELL S -24 10/22/12 B. Bixby Update Patch set API NO: 50- 029 - 23142 -00 BP EXPLORATION (AK) 2-V *----0- 61 DATE: 27-Jun-12 -: ','-'■A';' TRANS#: 5999 Delivery Services Technician D./7.F; TAIIIM11 gliifiriPi 2aPINT,02 N 3; 1': : : : i t1:E ":.', :11 '[ 1' 1 '' 11 :1 Ii Dal..7 S: 'Consulting Services . - . . .. . . 5::: aanibell St, Ste. /100 SCANNED FEB 5 6/3 Anchorage, AK 99503 R : Oiri'ice: (907) 273-1770 +'' :• ,-, : F., A . NAME ORDER # DIST DIST DIST hrst - -' LOGGED PRINTS PRINTS V-229 BBSK-00116 X MDT 8-May-12 1 CD MPS-24 BAUJ-00129 X MEMORY LEAK DETECTION LO 1-Jun-12 1 1 CD 13-15 C3NA-00019 X USIT/SONIC SCANNER 22-May-12 1 1 CD 13-15 BVYC-00037 X ISOLATION SCANNER 19-May-12 1 1 CD 04-18 C4W7-00015 X PRODUCTION PROFILE 26-May-12 1 1 CD C-27B C600-00011 X MEMORY LEAK DETECTION LO 5-Jun-12 1 1 CD 06-11 C3NA-00014 X CROSS FLOW W/ IBP 12-May-12 1 1 CD V-229 C3NA-00011 X USIT/CBL 8-May-12 1 1 CD D-14A C4W7-00012 X SLIM CEMENT MAPPING TOOL 24-May-12 1 1 CD Z-40 C2JC-00007 X USIT/CBL 27-Mar-12 1 1 CD 15-01B C600-00010 X MEMORY PRODUCTION PROFIT 3-Jun-12 1 1 CD • . . 1 1 X X Please return a signed copy to: Please return a signed copy to: BP PDC LR2-1 DCS 2525 Gambell St, Suite 400 900 E Benson Blvd Anchorage AK 99503 Anchorage AK 99508 ,.- ..r „,,..«. n.wym nor.. v ..,,, .. „- .' ,.A .,. , .s?. 'T ,• -: _..n a*=.xw _ • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 ` Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 Sa � D F B 4 2012 Mr. Tom Maunder � Alaska Oil and Gas Conservation Commission a0,3-°3 333 West 7 Avenue a f Anchorage, Alaska 99501 s Subject: Corrosion Inhibitor Treatments of MPS -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, (i ) Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) MPS -Pad 1 10/11/2011 Corrosion - Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft gal MPS-01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011 MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011 MPS-03 2021460 50029231050000 Open Flutes - Treated MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-05 2021370 50029231000000 Open Flutes - Treated MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009 MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011 MPS -09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009 MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -11 2021130 50029230920000 1 NA 1 NA 10.2 7/29/2011 MPS-12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011 MPS -13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009 MPS -14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011 MPS -15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011 MPS-16 2030650 50029231510000 1.2 NA 1.2 NA 102 7/29/2011 MPS -17 2021730 50029231150000 Open Flutes - Treated MPS -18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011 MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/3/2009 MPS -22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7/28/2011 MPS -23 2021320 50029230980000 Open Flutes - Treated -----> MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 102 7/28/2011 MPS -25 2021030 50029230890000 Open Flutes - Treated MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011 MPS -27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011 MPS -28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7/28/2011 MPS -29 2021950 50029231190000 Open Flutes - Treated MPS-30 2022360 50029231310000 12 NA 1.2 NA 11.9 7/28/2011 MPS -31 2020140 50029230660000 Open Flutes - Treated MPS-32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7/28/2011 MPS -33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011 MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7/28/2011 MPS-35 2031430 50029231750000 1.2 NA 12 NA 11.9 7/28/2011 MPS -37 2070520 , 50029233550000 13.9 Need top job NA MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/18/2011 MPS -41A 2081610 50029234010100 Sealed NA NA NA NA NA MPS -43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011 MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/62011 MPSB -04 _ 500299990799 0.6 NA 0.6 NA 3.4 7/30/2011 • • ~_ ~' ..~--- ~.r <,,', - ~ ;_ -- MICROFILMED 03/0112008 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:1LaserFiche\CvrPgs_Inserts~Nlicrofilm_Marker.doc e e WELL LOG TRANSMITTAL ¿}()3·- O'J'ð To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West ih Ave., Suite 100 Anchorage, Alaska 99501 February 16, 2006 /3l4D RE: MWD Fonnation Evaluation Logs MPS-24 + PB 1 + PB2, The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500 MPS-24 + PBl + PB2: LAS Data & Digital Log Images: 50-029-23142-00, 70, 71 1 CD Rom ~¡h /~~~ ) 7 M'J ~_~~ ,r- DATA SUBMITTAL COMPLIANCE REPORT 5/10/2005 Permit to Drill 2030380 Well Name/No. MILNE PT UNIT SB S-24 Operator BP EXPLORATION (ALASKA) INC A~eO~29_2t~~/,b~ 3 MD 8205 /' TVD 3890 / Completion Date 4/27/2003 /' Completion Status 1-01L REQUIRED INFORMATION Mud Log No Samples No DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, ABI, IFR, CASANDRA Well Log Information: Log/ Data Digital Type Med/Frmt LED-- r¡/ I I~ I Rpt /' Electr Dataset Number Name ,.eJ'I'féctional Survey Directional Survey Directional Survey Run No 1 Log Log Scale Media ~ Directional Survey c,jirJ D ~ectional Survey ijØt Directional Survey ~ Directional Survey ~ D ~rectional Survey I i~D r&.61'Í"ectional Survey ~ (1írèctional Survey ~ D Directional Survey ~ Directional Survey ~ Directional Survey ~ D ~rectional Survey ~D ~96 LIS Verification 1-5 11996 Induction/Resistivity 1-5 ~ 11997 LIS Verification 1,2 ~ D ~97 I nd uction/Resistivity 1,2 Current Status 1-01L UIC N Directional surv~ ........... (data taken from Logs Portion of Master Well Data Maint) '~ Interval OH/ Start Stop CH Received Comments 4780 6760 Open 5/13/2003 PB2 4780 6760 Open 5/13/2003 MWD PB2 6424 8205 Open 5/13/2003 A Directional Survey Log is required to be submitted. This record automatically created from Permit to Drill Module on: 3/13/2003. 6424 8205 Open 5/13/2003 MWD 543 5033 Open 5/13/2003 MWD PB1 543 5033 Open 5/13/2003 PB1 0 543 Open 5/13/2003 GYRO PB1 4780 6760 Open 5/13/2003 MWD PB2 6424 8205 Open 5/13/2003 -- 543 5033 Open 5/13/2003 PB1 0 543 Open 5/13/2003 GYRO PB1 4780 6760 Open 5/13/2003 PB2 543 5033 Open 5/13/2003 MWD PB1 6424 8205 Open 5/13/2003 MWD 69 8205 Open 6/2/2003 69 8145 Open 6/2/2003 MWD-ROP, DGR, EWR- MD 69 5033 Open 6/2/2003 PB1 69 4995 Open 6/2/2003 MWD-ROP, DGR, EWR - PB1 DATA SUBMITTAL COMPLIANCE REPORT 5/10/2005 Permit to Drill 2030380 MD 8205 Rpt ~ ! Well Name/No. MILNE PT UNIT SB S-24 TVD 3890 Completion Date 4/27/2003 11998 LIS Verification l>1"'9'98 Induction/Resistivity Well Cores/Samples Infonnation: Name Interval Start Stop ADDITIONAL INFORMATION Well Cored? Y /flJ Chips Received? ; I N Analysis Received? Comments: ~ Compliance Reviewed By: l~ Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23142-00-00 Completion Status 1-01L Current Status 1-01L UIC N 1-4 69 6760 Open 6/2/2003 PB2 1-4 4874 6705 Open 6/212003 MWD-ROP, DGR, EWR - PB2 Sample Set Sent Received Number Comments Daily History Received? <f)N &N Formation Tops Date: ~ Â~ ~ M-oJ- '<--- STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ) ) 1. Status of Well Œa Oil 0 Gas D Suspended D Abandoned D Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3289' NSL, 267' WEL, SEC. 12, T12N, R10E, UM At top of productive interval &tV 3121' NSL, 2164' WEL, SEC. 12, T12~R10E, UM X = 563848, Y = 5999772 10. Well Number At total depth 1064' NSL, 4647' WEL, SEC. 12, T12N, R10E, UM X = 561383, Y = 5997694 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Milne Point Unit I Schrader Bluff KBE = 72.4' ADL 380109 12. Date Spudded 13. Date T.D. Reached 14. Date Camp., Susp., or Aband. 4/17/2003 4/24/2003 4/27/2003 ,/ 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 8205 3890 FT 8205 3890 FT Œa Yes D No 22. Type Electric or Other Logs Run MWD , GR ABI , IFR , CASANDRA Classification of Service Well 7. Permit Number 203-038 8. API Number 50- 029-23142-00 9. Unit or Lease Name X = 565743, Y = 5999956 Milne Point Unit MPS-24 15. Water depth, if offshore 16. No. of Completions NI A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost NIA MD 1800' (Approx.) 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 92# H-40 35' 110' 42" ,260 sx Arctic Set (Approx.) 10-3/4" 45.5# L-80 35' 2704' 13-1/2" 682 sx PF 'L', 281 sx Class 'G' 7-518" 29.7# L-80 32' 5024' 9-7/8" 395 sx Class 'G' 4-1/2" x 4" 12.6# x 9.5 L-80 4765' 8205' 6-1/8" Sand Screens 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4",9.5#, L-80, Sand Screens MD TVD MD TVD 25. TUSING RECORD SIZE DEPTH SET (MD) 4-1/2", 12.6#, L-80 4652' 3-1/2", 9.2#, L-80 4652' - 4708' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 2000' Freeze Protected with 80 Bbls of Diesel PACKER SET (MD) 4664' 4951' - 8161' 4037' - 3896' ,r """':':"~·;'·;"·r~iTl~"¡Õ¡~r·"\'~ ; !'Ó·\"f. ~ 1 ,jd.,j_ I. ( _.2'.2,. η 03 ~ . ., .~.: VÃXfR' ED..~.· ~ j ~ L==:...... ..;~...,.:J 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) May 12, 2003 Hydraulic Pump Date of Test Hours Tested PRODUCTION FOR OIL-BsL GAs-McF WATER-BsL 5-16-2003 TEST PERIOD 2108 421 0 Flow Tubing Casing Pressure CALCULATED OIL-BsL GAs-McF WATER-BsL Press. 24-HoUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit c'N~ I::: I VI:::: 0 CHOKE SIZE GAS-OIL RATIO 200 OIL GRAVITY-API (CORR) No core samples were taken. JUN 0 9 2003 III)MS BFL (,IC JUN 1 It 'J~n{ '1'~' OR\G\N^l Alaska Oil & Gas Cons. Commission Anchorage Form 1 0-407 Rev. 07-01-80 Submit In Duplicate ) ) 29. Geologic Markers Marker Name Measured Depth SBF2-NA 4791' SBF1-NB 4875' SBF1-NB 5400' SBF1-NB 5531' SBF1-NB 8127' 30. Formation Tests True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 4009' 4029' 4012' 4009' 3901' 31. List of Attachments: RE EIVE JUN 0 9 200.3 Alaska Oil & Gas Gons. c A~~~~ Summary of Daily Drilling Reports, Surveys, Post Rig Work Summary and a LeaK-off Test Summary. ·32. I hereby certífy that the foregoing is true and correct to the best of my knowledge Signed ~~ Title Technical Assistant Date OlQ-Oi-O") MPS-24 203-038 Prepared By Name/Number: Sandra Stewman, 564-4750 Well Number Drilling Engineer: Steve Campbell, 564-4401 Permit No. I Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in ìtem 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level {Gl} or other elevation (OF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut~ln, Other-explain. ITEM 28: If no cores taken, indicate 'none'. . "'I" Form 10-407 Rev. 07-01-80 OR\G\NAL ) ) BPEXPLORATION Pagelof5 Ope"éltions$umrnary·. R~port Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-24 MPS-24 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 4/16/2003 Rig Release: 4/27/2003 Rig Number: Spud Date: 4/17/2003 End: 4/27/2003 Date From·~To HOurs Task . Code NPT 4/16/2003 12:00 - 16:00 4.00 MOB P PRE 16:00 -19:00 3.00 RIGU P PRE 19:00 - 22:00 3.00 DRILL P SURF 22:00 - 23:00 1.00 DRILL P SURF 23:00 - 23:30 0.50 DRILL P SURF 23:30 - 00:00 0.50 RIGU P PRE 4/17/2003 00:00 - 01 :30 1.50 DRILL P SURF 01 :30 - 02:00 0.50 DRILL P SURF 02:00 - 03:30 1.50 DRILL P SURF 03:30 - 05:30 2.00 DRILL P SURF 05:30 - 00:00 18.50 DRILL P SURF 4/18/2003 00:00 - 05:30 5.50 DRILL P SURF 05:30 - 07:00 1.50 CASE P SURF 07:00 - 09:00 2.00 CASE P SURF 09:00 - 11 :00 2.00 CASE P SURF 11 :00 - 12:30 1.50 CASE P SURF 12:30 - 15:30 3.00 CASE P SURF 15:30 - 17:30 2.00 CASE P SURF 17:30 - 21 :00 3.50 CASE P SURF 21 :00 - 22:00 1.00 CASE P SURF 22:00 - 00:00 2.00 CASE P SURF 4/19/2003 00:00 - 00:30 0.50 CEMT P SURF 00:30 - 03:00 2.50 CEMT P SURF Description of Operations Rig Down, Move Off MPS-01 & Move Rig to MPS-24. Spot Rig over Conductor. Skid Rig Floor. RIG ACCEPTED @ 16:00 HRS. RIU to Drill : Take On Water, NIU Diverter,Mix Spud Mud, Load Pipeshed wI 5" DP. P/U 102 Jts. of 4" DP & Stand back in Derrick. P/U BHA to Floor P/U 17 Jts 5" HWDP & Jars and Stand Back in Derrick Function Test Diverter. Witness of Test Waived by John Crisp, AOGCC. M/U & Orient BHA #1 Pre - Spud Meeting w/ Crew & all Service Personnel Fill Conductor wI Mud - Check for Leaks. Drill from 112' to 290' POH for Monel Flex Collars & Run back to bottom. Gyro Survey. Directional Drill from 290' to 1965'. 475 gpm @ 2400 psi. WOB = 15 to 50K, RPM = 75 to 100. TO = 3 to 8K. AST = 3.75 Hrs. ART = 9 Hrs. Ran 5 Gyro Surveys - Last @ 543'. Bit balling began @ 1380'. Thick & sticky clay over shakers. Un-balled wI Sapp I Nut Plug sweeps. Directional Drill from 1965' to 2714' - TD. 475 gpm @ 2450 psi. TO = 9K, ROT = 90 to 100 RPM, WOB = 15 to 50K P/U = 120K, S/O = 105K ROT = 112K. AST = 1.58 Hrs. ART = 3.33 Hrs. Circulate Hole Clean. 2X B/U. 475 GPM @ 2130 psi. Pump out of Hole to HWDP. RIH to Bottom - Work through tight spot @ 1650'. Circ. 2 + B/U. Lot of wood over shaker @ B/U. Pump out of Hole to HWDP. Stand Back HWDP & Flex De's, UD rest of BHA. Clear Floor. RlU to run 10 3/4" Casing. PJSM w/ Crew. M/U 10 3/4" Shoe Track & check Floats. Run 65 Jts, 10 3/4", L-80, BTC Surface Casing. Shoe @ 2704. P/U Wt = 180K SIO Wt. = 120K. RID Fill - Up Tool. Blow down Top Drive. RlU HES Cement Head. Circulate & Condition Mud for Cement Job. Pump @ 10 BPM & 420 psi. Circulate & Condition Mud for Cement Job. Vis = 50 YP = 15 Turn over to HES: Pump 10 Bbls. Water. Test Lines to 3500 psi. Pump 10 Bbls Water. Pump 50 BBls 'ALPHA' Spacer Mixed @ 10.2 ppg. with 1 Gallon Red Dye in the 1 st. 5 Bbls of Spacer. Drop Bottom Plug. Mix & pump @ 8 to 9 BPM, 10.7 ppg., PERMAFROST L Slurry wI yield of 4.15 cf/sx. Red Dye at Surface after pumping 680 sx - 504 Bbls. Switch to Tail slurry. Printed: 4/28/2003 9:12:25 AM ) ) BP EXPLORATION Operations .SunimaryReport· Pagè2 of5 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-24 MPS-24 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 4/16/2003 Rig Release: 4/27/2003 Rig Number: Spud Date: 4/17/2003 End: 4/27/2003 Date From- To HOurs ·.Task Code NPT Phase Description of Operations 4/19/2003 00:30 - 03:00 2.50 CEMT P SURF Mix & Pump @ 5 BPM, 58 bbls, 275 SX, Class G Premium Cement @ 15.8 ppg. - yield of 1.16 cf/sx. Drop Top Plug & Chase wI 30 Bbls Water. Switch to Rig pump & Displace wI 222 Bbls 9.4 ppg Mud @ 6.4 BPM, Slowed to 3.5 BPM for Last 5 BBls. FCP = 870 psi. Bumped Plug wI 1900 psi. Bled off - Floats OK. 220 BBls 10.7 ppg. Good Cement to Surface. CIP @ 03:00 Hrs. 03:00 - 04:00 1.00 CASE P SURF RID Cement Head. Back out landing jt. Flush Diverter & surface Equipment. 04:00 - 05:00 1.00 CASE P SURF NID Diverter System. 05:00 - 05:30 0.50 CASE P SURF N/U FMC 20" X 11" Casing Head & 11 " X 11" Tubing spool. Test Metal to Metal seal to 1000 psi. 05:30 - 08:00 2.50 CASE P SURF N/U 13 5/8", 5000# BOPE 08:00 - 12:00 4.00 CASE P SURF RIU & Test BOPE to 250 I 3500 psi. Annular to 250 I 2500 psi. Witness of Test waived by Jeff Jones, AOGCC. Pull Test Plug, Install Wear Bushing. 12:00 - 12:30 0.50 CASE P SURF Install Elevators. Bring BHA Componants to Rig Floor. 12:30 - 14:00 1.50 CASE P SURF Slip & Cut Drilling Line. 14:00 - 16:00 2.00 CASE P SURF M/U BHA. Orient & Surface Test MWD. 16:00 - 17:00 1.00 CASE P SURF RIH to 2545'. 17:00 - 18:00 1.00 CASE P SURF Break Circulation & pressure test 10 3/4" Casing to 2500 psi for 30 Minutes. 18:00 - 18:30 0.50 DRILL P INT1 Drill Float Collar, Shoe Track & Shoe. Clean out Rat Hole to 2714. Drill new Hole to 2734. 18:30 - 19:00 0.50 DRILL P INT1 Circulate & Condition Mud for FIT. 19:00 - 19:30 0.50 DRILL P INT1 Perform FIT. 9.3 ppg. Mud & Surface Pressure of 310 psi. FIT = 11.6 ppg. EMW. 19:30 - 00:00 4.50 DRILL P INT1 Directional drill 9 7/8" Hole from 2734' to 3502'. TO = 5.5K WOB = 20 to 35K, 100 RPM, 470 GPM @ 1850 psi. P/U = 126K, S/O = 101 K, ROT = 111 K. ART = 1.75 Hrs. AST = 1 Hr. NOTE: Displaced Well to clean, 8.7 ppg, LSND Mud on the fly while drilling @ +1- 3000'. 4/20/2003 00:00 - 14:00 14.00 DRILL P INT1 Directional Drill from 3502' to 5033'- TO. 500 GPM @ 2220 psi. TO = 8 K, RPM = 80 to 100, WOB = 10 to 40K P/U = 135K, S/O = 97K, ROT = 112K ART = 2.75 Hrs., AST = 7.75 Hrs. Top 'NB' Sand @ 4875'. 14:00 - 15:30 1.50 CASE P INT1 Circulate 3 Bottoms Up @ 550 GPM & 2400 psi. Reciprocate & Rotate @ 120 RPM. 15:30 - 17:30 2.00 CASE P INT1 Pump out of Hole to Shoe @ 2714' at above rate. 17:30 - 18:00 0.50 CASE P INT1 Service Top Drive. 18:00 - 19:00 1.00 CASE P INT1 RIH to TO @ 5033'. No Problems. 19:00 - 20:30 1.50 CASE P INT1 Circulate 3 Bottoms Up @ 550 GPM & 2400 psi. Reciprocate & Rotate @ 120 RPM. 20:30 - 22:30 2.00 CASE P INT1 Pump out of Hole to Shoe @ 2714' at above rate. 22:30 - 23:00 0.50 CASE P INT1 CBU @ Shoe. Pump Slug. 23:00 - 00:00 1.00 CASE P INT1 POH Standing Back 4" DP. 4/21/2003 00:00 - 01 :30 1.50 CASE P INT1 UD BHA #2. 01 :30 - 03:30 2.00 CASE P INT1 Change Top Pipe Rams to 7 5/8" & Test Bonnet Seals to 1500 psi while R/U to run 7 5/8" Casing. PJSM wI All Hands. Printed: 412812003 9:12:25 AM ) ) BP EXPLORATION Page~..of5 Operations. Sum<rtlaryRèport Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-24 MPS-24 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 4/16/2003 Rig Release: 4/27/2003 Rig Number: Spud Date: 4/17/2003 End: 4/27/2003 Date From- To Hours Task Code NPT . Phase· D~scriptiol'1ofOperations 4/21/2003 03:30 - 05:30 2.00 CASE P INT1 M/U 7 5/8" Shoe Track & check Floats - OK. Run 66 Jts, 7 5/8", 29.7#, L-80, BTC-Mod Casing as per program to 103/4" shoe. 05:30 - 06:30 1.00 CASE P INT1 CBU @ Shoe, 6 BPM @ 350 psi. 06:30 - 08:00 1.50 CASE P INT1 Run total 122 Jts 7 5/8" Csg. M/U Hanger & Land - Shoe @ 5023' 08:00 - 08:30 0.50 CEMT P INT1 LID Frank's Tool & M/U Cement Head. 08:30 - 10:00 1.50 CEMT P INT1 Circulate & Condition Mud for Cement Job. 6 BPM @ 350 psi. Vis =44, YP= 13 10:00 - 11 :30 1.50 CEMT P INT1 Turn over to HOWCO: Pump 5 Bbls Water Test Lines to 3500 psi. Pump 15 Bbls Water Mix & Pump 50 Bbls, 10.2 ppg, ALPHA Spacer @ 4.5BPM - 400 psi. Drop Bottom Plug Mix & Pump 86 Bbls, 395 sx Class 'G' Slurry with 3% KCL + 1 % Cal Seal + 0.6% LAP @ 15.6 ppg with yield of 1.21 cu. ft./ sx. Pump @ 5 Bpm / 600 psi. Wash out Cement Line through "T". Drop Top Plug Displace wI HOWCO: 227 Bbls, 9.7 ppg., Flo-Pro Mud. @ 5 BPM. FCP = 554 psi. Bump Plug wI 1500 psi. 11 :30 - 12:00 0.50 CEMT P INT1 Bleed back to HOWCO. Check Floats - OK. RID Cement Head 12:00 - 13:00 1.00 CASE P INT1 Back out & LID Landing Jt., Change Bails. 13:00 - 14:00 1.00 CASE P INT1 Run Pack Off, R.I.L.D.S. & Test P/O to 5000 psi. 14:00 - 16:00 2.00 CASE P INT1 Change out Top Rams to 31/2" X 6". Test Same to 250/3500 psi. 16:00 - 16:30 0.50 CASE P INT1 Test 7 5/8" casing to 3500 psi for 30 Minutes 16:30 - 19:30 3.00 STWHIP P PROD2 M/U Whipstock Assy. & MWD. Surface Test MWD. P/U DC's & HWDP. 19:30 - 21 :30 2.00 STWHIP P PROD2 RIH to 4877'. 21 :30 - 22:00 0.50 STWHIP P PROD2 Orient 4 Deg. Left of High Side & Set Whipstock w Tail @ 4940'. 22:00 - 00:00 2.00 STWHIP P PROD2 Mill Window - TOW @ 4874'. Mill to 4883'. 4/22/2003 00:00 - 01 :00 1.00 STWHIP P PROD2 Complete Milling Window to 4886'. Clean & Mill hole to 4901'. 01 :00 - 01 :30 0.50 STWHIP P PROD2 Circulate Hi -Vis sweep. 01 :30 - 02:00 0.50 STWHIP P PROD2 Perform FIT: 9.7 ppg Mud, 4029' TVD, 290 psi surface Pressure = 11.08 ppg. EMW FIT 02:00 - 03:30 1.50 STWHIP P PROD2 POH, LID Milling Assy. 03:30 - 04:00 0.50 STWHIP P PROD2 M/U Stack Washer, Flush BOP, Function & Flush again. 04:00 - 05:00 1.00 DRILL P PROD1 M/U 61/8" Lateral Drilling BHA. Surface Test MWD. 05:00 - 06:00 1.00 DRILL P PROD1 RIH to 4720'. 06:00 - 07:00 1.00 DRILL P PROD1 Slip & Cut Drilling Line, Service Top Drive. RIH to 4901' 07:00 - 00:00 17.00 DRILL P PROD1 Directional Drill from 4901' to 6540'.242 GPM @ 1780 psi. TQ = 4K, RPM = 80, WOB = 5 to 15K P/U = 113K, S/O = 80K, ROT = 100K AST = 3.5 HRS. ART = 7.25 HRS. 4/23/2003 00:00 - 02:00 2.00 DRILL P PROD1 Continue Dir. Drilling from 6540' to 6760'. Topping out of NB. 02:00 - 02:30 0.50 DRILL P PROD1 Pump out of Hole to 6446' 02:30 - 00:00 21.50 STKOH P PROD1 Open Hole Sidetrack - Low Side. Directional Drill from 6446' to 7593'. 242 GPM @ 2360 psi. TQ = 5K, RPM = 80, WOB = 5 to 15K, ECD'S WITHIN RANGE Printed: 4/28/2003 9:12:25 AM ) ) BP EXPLORATION Page4of5 Operatio n!;S lImrnClryReport Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: M PS-24 MPS-24 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 4/16/2003 Rig Release: 4/27/2003 Rig Number: Spud Date: 4/17/2003 End: 4/27/2003 Date From- To Hours Task Code NPT Phase Description of Oþerations· 4/23/2003 02:30 - 00:00 21.50 STKOH P PROD1 P/U = 111 K, S/O = 77K, ROT = 99K AST = 6.33 HRS. ART = 7.92 HRS 4/24/2003 00:00 - 08:00 8.00 DRILL P PROD1 Directional Drill from 7593' to 8205'. 245 GPM @ 2420 psi. TQ = 7K, RPM = 80, WOB = 4 to 15K, ECD = 11.86 ppg. PU = 112K, S/O = 75K, ROT = 100K. ART = 4 HRS. AST = 1.16 HRS. 08:00 - 10:00 2.00 DRILL P PROD1 Circulate 2+ times Bottoms Up @ 6 BPM - 1940 psi. Reciprocate while Rotating @ 100 RPM. 10:00 - 13:00 3.00 DRILL P PROD1 Pump out of Hole to 4820' @ 6 BPM - 1940 to 1600 psi. 13:00 - 13:30 0.50 DRILL P PROD1 CBU above Window. Pump Slug. 13:30 - 15:30 2.00 DRILL P PROD1 POH Standing Back DP. 15:30 - 17:30 2.00 DRILL P PROD1 Down load MWD & LID BHA. 17:30 - 19:30 2.00 CLEAN P COMP Up Load PWD. M/U Hole Opener BHA. Surface Test PWD 19:30 - 21 :30 2.00 CLEAN P COMP RI H to 4820'. 21 :30 - 22:00 0.50 CLEAN P COMP CBU & Take Basline ECD Readings. 3 BPM @ 120 RPM & 760 psi = 10.6 ppg. 7 BPM @ 120 RPM & 2300 psi = 10.92 ppg. 22:00 - 23:30 1.50 CLEAN P COMP RIH to 8115'. Hole in good Shape. P/U = 11 OK S/O = 85K. 23:30 - 00:00 0.50 CLEAN P COMP Break circulation. Wash to bottom @ 8205' Circulate @ 7 BPM & ICP of 2820 psi, wi 120 RPM. 4/25/2003 00:00 - 01 :00 1.00 CLEAN P COMP Continue CBU - 2+ Times. 7 BPM 1120 RPM Reciprocating 80 ft. FCP = 2740 psi. ECD = 11.9 ppg. 01 :00 - 02:30 1.50 CLEAN P COMP Slow Rotation to 15 RPM, Continue Reciprocating. Pump 20 Bbls Hi Vis Spacer @ 3 BPM I 900 psi. Pump 160 Bbls 9.8 ppg Filtered Brine Pump 1 st. 60 Bbls @ 3BPM I 900 psi. & remaining 100 Bbls @ 5.2 BPM 11750 psi. ECD's From 11.1 ppg. to 11.3 ppg. Pumped 320 Bbls 9.8 ppg, Clean solids Free Flo-Pro Mud @ 7 BPM w/ICP of 2720 psi. & ECD of 11.3 ppg. With FloPro @ Window - Pressure = 2380 psi & 10.9 ECD. with Flo-Pro at Surface - Pressure + 2300 psi & ECD 11.3 ppg. 02:30 - 05:00 2.50 CLEAN P COMP Pump out of Hole to Window @ 245 GPM FCP = 1630 psi. ECD's Avg. 10.7 ppg. 05:00 - 05:30 0.50 CLEAN P COMP CBU @ Window - 275 GPM @ 1600 psi. 05:30 - 07:00 1.50 CLEAN P COMP POH to BHA 07:00 - 07:30 0.50 CLEAN P COMP LID Hole Opener BHA. 07:30 - 08:30 1.00 CASE P COMP RIU to Run 4" Excluder Screen Liner. PJSM w/ All Hands. 08:30 - 13:30 5.00 CASE P COMP RIH w/4" Screen & Blank Liner as per Program to 4874'. 13:30 -14:00 0.50 CASE P COMP Circulate DP volume @ 127 GPM / 250 psi. 14:00 - 16:00 2.00 CASE P COMP Run Liner into Open Hole to Bottom @ 8205'. P/U WT = 130K, S/O WT = 85K. 16:00 - 18:00 2.00 CASE P COMP Circulate DP Volume @ 127 GPM I 600 psi. Drop Ball & pump down to Packer. Pull string up out of Compression. Set HMC Liner hanger & ZXP Packer. Test ZXP Packer to 1500 psi. Release from Packer. ZXP Set @ 4764'. 18:00 - 19:00 1.00 CASE P COMP POH, Lay Down DP, DC's & HWDP. 19:00 - 20:00 1.00 CASE P COMP Slip & Cut Drilling Line. Service Top Drive. 20:00 - 22:00 2.00 CASE P COMP POH, LID 90 Jts. 4" DP, Stand Back Remainder. 22:00 - 22:30 0.50 CASE P COMP Break Down & LID Liner Running Tool. 22:30 - 23:00 0.50 CASE P COMP P/U & M/U Ported Sub. 23:00 - 00:00 1.00 CASE P COMP RIH 4/26/2003 00:00 - 00:30 0.50 CASE P COMP RIH to 4760' Printed: 4/28/2003 9: 12:25 AM ) ) BP EXÞLORATION OperatipnsSummary Report . . Page 5 of5 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-24 MPS-24 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 4/16/2003 Rig Release: 4/27/2003 Rig Number: Spud Date: 4/17/2003 End: 4/27/2003 Date From .~ To Hours Task Code NPT Phase Description. of Operations 4/26/2003 00:00 - 00:30 0.50 CASE P COMP 00:30 - 02:30 2.00 CASE P COMP Circulate 20 bbl Hi-Vis Sweep and displace Flo-Pro with 9.4 ppg filtered brine @ 5 BPM & 440 psi. Rotate and reciprocate pipe while displacing. 02:30 - 04:30 2.00 CASE P COMP POH with 4" drill pipe and stand back. Lay down Ported Nipple Assy. 04:30 - 05:30 1.00 RUNCOI\tP COMP R/U to Run 4.5" Completion. Pre job safety meeting with drilling crew and third party contractors. 05:30 - 14:30 9.00 RUNCOI\tP COMP Run 4.5" Tubing Completion as per Program. Final P/U = 100K S/O = 90K. Land Tubing wI TWC Installed in Hanger. R.I.L.D.S. WLEG @ 4719'. 14:30 - 15:00 0.50 RUNCOI\tP COMP Test TWC to 1000 psi. LID Landing Jt. 15:00 - 16:00 1.00 RUNCOI\tP COMP N/D BOPE 16:00 - 17:00 1.00 RUNCOI\tP COMP N/U Adapter Flange & Tree. Test I - Wire & Penetrator. 17:00 - 18:00 1.00 RUNCOI\tP COMP Test Adapter Flange & Tree to 5000 psi. Pull TWC wI lubricator. 18:00 - 18:30 0.50 RUNCOI\tP COMP R/U Circulating Manifold & Lines to Tree. 18:30 - 19:30 1.00 RUNCOI\tP COMP Reverse Circulate @ 3 BPM I 200 psi. & Spot 67 Bbls, Corrosion Inhibited, Filtered, 9.4 ppg. Brine in Annulus from Packer to GLM @ 2100'. 19:30 - 22:00 2.50 RUNCOI\tP COMP Drop BallI Rod Assy. R/U 1 st. Energy. Test Lines to 4500 psi. Pump down tubing, Pressure to 4000 psi to set Premier Packer. Hold 4000 psi for 30 minute Test. Bleed Tbg to 3000 psi & Pressure Annulus to 4500 psi. & hold for 30 minute Test. Bleed down Tubing - RP sheared wI 2400 psi differential. 22:00 - 23:30 1.50 RIGD P COMP Pump 80 Bbls Diesel down Annulus @ 2.7 BPM & 1800 psi. Shut in and allow to U-Tube. - Tbg & Ann. Freeze Protected to 2000'. 23:30 - 00:00 0.50 RIGD P COMP RID Circulating Manifold. 4/27/2003 00:00 - 00:30 0.50 RIGD P COMP RID Circulating Lines from Tree. 00:30 - 01 :30 1.00 RIGD P COMP Install BPV. Test from below to 1000 psi. 01 :30 - 02:00 0.50 RIGD P COMP RID 1 st Energy. Clear Cellar. Secure Well. RELEASE RIG @ 02:00 HRS, 4/27/03. Printed: 4/28/2003 9:12:25 AM ) ) Well: Field: API: Permit: Date MPS-24 Milne Point Unit I Schrader Bluff 50-029-23142-00 203-038 Accept: Spud: Release: Rig: 04/16/03 04/17/03 04/27/03 Doyon 14 POST-RIG WORK 04/27/03 PULLED BPV, RP, RHC, SET DGLV IN SPM, OPENED SSD, SET BP-1069, 13C RATIO JET PUMP. 04/28/03 HELD SAFETY MEETING PRIOR TO FLOWBACK TO TANKAGE. WELL S-24 CLEANED UP QUICKLY AND WAS FOUND CAPABLE OF FREE FLOWING TO TANKAGE BUT WILL NOT AGAINST HEADER PRESSURE. FORMATION FLUID FLOW RATES DIFFICULT TO ESTIMATE IN TRUE STOCK TANK BARRELS DUE TO FOAMINESS OF CRUDE. ARRIVED LOCATION, HELD PRE-JOB SAFETY MEETING, PRESSURE TESTED TO 3500 PSI. START DOWN THE TUBING WITH 35 BBLS DIESEL @ 2 BPM WI 950 PSI MAX. SWITCHED TO IA AND PUMPSED _47 BBLS MEOH @ 1.3 BPM WI 1500 PSI MAX FLUSHING THROUGH THE TEMPORARY WATER SUPPLY LINE. AN ADDITIONAL 47 BBLS MEOH WAS PUMPED DOWN THE HEADER DUE TO HOOKING UP IN THE WRONG SPOT. 05/07/03 PJSM. MIRU FESCO. PT'D TO 4700 PSI. LEAK TESTED POWER FLUID LINE TO 4500 PSI FOR 10 MIN. RIGGED UP TO PRODUCTION LINE AND PT'D UP STREAM OF THE CHOKE TO 3200 PSI FOR 10 MIN AND DOWN STREAM OF THE CHOKE TO 1150 PSI FOR 10 MIN. GOOD TEST ON ALL LINES. RDMO OS/24/03 ARRIVED LOCATION, HELD PRE-JOB SAFETY MEETING, PRESSURE TESTED TO 3500 PSI. START DOWN THE TUBING WITH 18 BBLS MEOH AND 17 BBLS DIESEL (ALREADY ON UNIT) @ 1.5 BPM WI 700 PSI MAX. SWITCHED TO IA AND PUMPED 45 BBLS MEOH (USED MEOH DUE TO TIME SHUT IN AND DELAY IN GETTING WL WORK DONE) @ 2 BPM WI 825 PSI MAX. OS/25/03 PULLED JET PUMP, EXTREMELY FLOWS CUT ON POWER FLUID FLOW PATH. ATTEMPTED SETTING PUMP ONCE, PULLED OUT OF HOLE. BOTTOM PIN SHEARED. LOCKED WAS FULL OF SAND AND METAL FLAKES. BRUSHED AND FLUSHED TUBING. SET 13C JET PUMP (BP- 1074). NOTE: ON BOTH ATTEMPTS TO SET THE PUMP HAD TROUBLE GETTING THROUGH THE TREE ON THIS WELL. Legal Name: MPS-24 Common Name: MPS-24 Test Date 4/19/2003 4/21/2003 FIT FIT Test Type Test Depth (TMD) 2,704.0 (ft) 4,874.0 (ft) BPE~PUOAA'-IØN Lèak-()fft~st$ul't1rn¿¡.y . TestDepth(TVD) 2,575.0 (ft) 4,029.0 (ft) AMW 9.30 (ppg) 9.70 (ppg) Sui'facePressÙre 310 (psi) 290 (psi) L~iifsøffeI'Ø~sUre(aHP)·· . 1,554 (psi) 2,320 (psi) Page 1()f1 EMW. 11.62 (ppg) 11.09 (ppg) ,c~ Printed: 4/28/2003 9:12:18 AM ) ) ó?ö3-ù3r 30-Apr-03 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-24 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 6,424.79' MD Window / Kickoff Survey: 6,446.00' MD (if applicable) Projected Survey: 8,205.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED MAY 13 2003 Alaska Of; & Gas Cons. Commfeeion Anchorase Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-24 --' Job No. AKZZ0002399225, Surveyed: 30 April, 2003 Survey Report 30 April, 2003 Your Ref: API 500292314200 Surface Coordinates: 5999955.70 N, 565743.45 E (70024' 37.1616" N, 149027' 52.8093" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 -- Surface Coordinates relative to Project H Reference: 999955.70 N, 65743.45 E (Grid) Surface Coordinates relative to Structure: 14.00 S, 601.70 W (True) Kelly Bushing: 72.45ft above Mean Sea Level Elevation relative to Project V Reference: 72.45ft Elevation relative to Structure: 72.45ft spe""""y-sul'l DRIL-LING SERVices A Halliburton Company Survey Ref: svy1169 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24 Your Ref: API 500292314200 Job No. AKZZ0002399225. Surveyed: 30 April. 2003 BP EXPLORA TlON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 6424.79 91.670 221.340 3927.71 4000.16 1367.46 S 2874.09 W 5998563.00 N 562881.51 E 3168.46 Tie On Point 6446.00 91.360 221.270 3927.15 3999.60 1383.38 S 2888.08 W 5998546.95 N 562867.66 E 1.498 3187.05 Window Point 6472.57 88.460 221.380 3927.19 3999.64 1403.34 S 2905.63 W 5998526.84 N 562850.29 E 10.922 3210.36 6523.46 89.630 221.390 3928.04 4000.49 1441.51 S 2939.26 W 5998488.37 N 562816.99 E 2.299 3255.03 6567.07 89.750 221.700 3928.28 4000.73 1474.15 S 2968.19 W 5998455.48 N 562788.35 E 0.762 3293,37 6615.58 87.280 220.680 3929.53 4001.98 1510.64 S 3000.12 W 5998418.71 N 562756.74 E 5.508 3335.86 6663.11 92.590 220.670 3929.59 4002.04 1546.67 S 3031.09 W 5998382.41 N 562726.09 E 11 .172 3377.28 -~j 6713.33 92.530 221 .100 3927.35 3999.80 1584.60 S 3063.93 W 5998344.19 N 562693.59 E 0.864 3421.11 6759.90 92.410 220.390 3925.34 3997.79 1619.85 S 3094.29 W 5998308.67 N 562663.54 E 1.545 3461.71 6810.31 92.530 220.610 3923.17 3995.62 1658.15 S 3127.00 W 5998270.09 N 562631.17 E 0.497 3505.54 6855.53 94.020 225.530 3920.58 3993.03 1691.12 S 3157.82 W 5998236.85 N 562600.64 E 11.351 3545.78 6904.28 93.770 228.700 3917.27 3989.72 1724.21 S 3193.45 W 5998203.44 N 562565.30 E 6.508 3590.58 6948.03 94.510 233.050 3914.11 3986.56 1751.745 3227.30 W 5998175.62 N 562531.70 E 10.060 3631.80 6997.71 95.750 236.460 3909.67 3982.12 1780.295 3267.70 W 5998146.71 N 562491.55 E 7.278 3679.53 7046.88 96.240 237.710 3904.53 3976.98 1806.87 5 3308.75 W 5998119.78 N 562450.73 E 2.718 3727.19 7096.10 94.570 241.900 3899.89 3972.34 1831.50 S 3351.09 W 5998094.77 N 562408.61 E 9.129 3775.41 7141.03 94.020 242.870 3896.53 3968.98 1852.275 3390.79 W 5998073.66 N 562369.10 E 2.477 3819.81 7189.30 93.640 242.380 3893.30 3965.75 1874.41 5 3433.56 W 5998051.13 N 562326.52 E 1.283 3867.58 7237.34 93.890 242.610 3890.15 3962.60 1896.55 5 3476.08 W 5998028.62 N 562284.20 E 0,706 3915.10 7286.01 90.490 243.220 3888.29 3960.74 1918.69 S 3519.37 W 5998006.10 N 562241.10 E 7.097 3963.36 7333.43 90.430 242.810 3887.91 3960.36 1940.21 S 3561.63 W 5997984.21 N 562199.04 E 0.874 4010.43 7382.21 89.200 243.860 3888.07 3960.52 1962.10 S 3605.22 W 5997961.94 N 562155.64 E 3.315 4058.87 7429.84 88.830 245.360 3888.88 3961.33 1982.52 S 3648.24 W 5997941.14 N 562112.80 E 3.243 4106.28 7478.18 92.220 247.810 3888.44 3960.89 2001.725 3692.59 W 5997921.55 N 562068.63 E 8.652 4154.53 7525.79 92.840 248.330 3886.34 3958.79 2019.49 S 3736.71 W 5997903.40 N 562024.66 E 1.699 4202.06 '-' 7576.17 94.200 250.670 3883.25 3955.70 2037.10 S 3783.80 W 5997885.38 N 561977.72 E 5.365 4252.34 7622.21 95.440 249.780 3879.38 3951.83 2052.62 S 3826.97 W 5997869.48 N 561934.69 E 3.311 4298.22 7668.85 94.200 251.730 3875.46 3947.91 2067.93 S 3870.85 W 5997853.77 N 561890.95 E 4.942 4344.68 7716.76 95.010 250.900 3871.61 3944.06 2083.23 S 3916.09 W 5997838.08 N 561845.85 E 2.417 4392.43 7766.25 96.180 251.020 3866.79 3939.24 2099.30 5 3962.65 W 5997821.60 N 561799.44 E 2.376 4441.67 7813.03 95.500 252.650 3862.03 3934.48 2113.81 5 4006.86 W 5997806.70 N 561755.35 E 3.759 4488.18 7864.18 95.750 253.200 3857.01 3929.46 2128.75 S 4055.52 W 5997791.33 N 561706.82 E 1.176 4539.02 7909.42 95.440 253.110 3852.60 3925.05 2141.805 4098.61 W 5997777.90 N 561663.85 E 0.713 4583.98 7959.43 95.130 253.010 3848.00 3920.45 2156.31 S 4146.25 W 5997762.98 N 561616.34 E 0.651 4633,70 8003.84 95.630 253.080 3843.83 3916.28 2169.21 S 4188.54 W 5997749.71 N 561574.16 E 1.137 4677.86 ~~------ 30 April, 2003 - 9:48 Page 20f4 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24 Your Ref: APlSO0292314200 Job No. AKZZ0002399225, Surveyed: 30 April, 2003 BP EXPLORA TION (ALASKA) INC. Milne Point Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) 8057.90 97.370 254.010 3837.71 3910.16 8100.54 97.620 255.190 3832.15 3904.60 8134.24 97.930 254.540 3827.59 3900.04 8205.00 97.930 254.540 3817.83 3890.28 Local Coordinates Northings Eastings (ft) (ft) 2184.42 S 2195.65 S 2204.36 S 2223.05 S 4240.05 W 4280.81 W 4313.04 W 4380.59 W All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 250.000° (True). Magnetic Declination at Surface is 25.532°(16-Apr-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 8205.00ft., The Bottom Hole Displacement is 4912.38ft., in the Direction of 243.093° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 6424.79 6446.00 8205.00 4000.16 3999.60 3890.28 2874.09 W 2888.08 W 4380.59 W Tie On Point Window Point Projected Survey 1367.46 S 1383.38 S 2223.05 S 30 April, 2003 - 9:48 Page 3 of4 Global Coordinates Northings Eastings (ft) (ft) 5997734.04 N 5997722.46 N 5997713.46 N 5997694.18 N 561522.79 E 561482.13 E 561449.98 E 561382.60 E Dogleg Vertical Rate Section (0/100ft) 3.644 2.806 2,121 0.000 BPXA Comment 4731.46 4773.60 4806.87 4876.73 Projected Survey --' -- DrillQlIest 3.03.02.005 BP EXPLORA TlON (ALASKA) INC. Milne Point Unit Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24 Your Ref: API 500292314200 Job No. AKZZ0002399225, Surveyed: 30 April, 2003 BPXA Survey tool program for MPS-24 Fro m Measured Vertical Depth Depth (ft) (ft) 0.00 543.00 0.00 542.98 30 April, 2003 - 9:48 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 543.00 8205.00 542.98 Tolerable Gyro (MPS-24PB1 Gyro) 3890.28 AK-6 BP _IFR-AK (MPS-24PB1) ~. - Page 4 of 4 DrillQllest 3.03.02.005 ) ) ¿;¡à3-(J~ 30-Apr-03 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-24 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 6,424.79' MD Window / Kickoff Survey: 6,446.00' MD (if applicable) Projected Survey: 8,205.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED MAY 13 2003 Alaaka OU & Gas Cons. Commiteion And1arage Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-24 MWD ~ Job No. AKMW0002399225, Survey Report 30 April, 2003 Your Ref: API 500292314200 Surface Coordinates: 5999955.70 N, 565743.45 E (70024' 37.1616" N, 149027'52.8093" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 -- Surface Coordinates relative to Project H Reference: 999955.70 N, 65743.45 E (Grid) Surface Coordinates relative to Structure: 14.00 S, 601.70 W (True) Kelly Bushing: 72.45ft above Mean Sea Level Elevation relative to Project V Reference: 72.45ft Elevation relative to Structure: 72.45ft spe..........y-5UI'l DRILLING seRVIc:es A Halliburton Company Survey Ref: svy1175 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24 MWD Your Ref: AP/500292314200 Job No. AKMWOOO2399225. BP EXPLORA T/ON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft) 6424.79 91.670 223.120 3927.71 4000.16 1345.90 S 2878.52 W 5998584.51 N 562876.88 E 3165,25 Tie On Point 6446,00 91.360 221.270 3927.15 3999.60 1361.61 S 2892.76 W 5998568.68 N 562862.78 E 8.841 3184.01 Window Point 6472.57 88.460 220.580 3927.19 3999.64 1381.68 S 2910.17 W 5998548.46 N 562845.56 E 11.219 3207.23 6523.46 89.630 221.550 3928.04 4000.49 1420.04 S 2943.59 W 5998509.80 N 562812.47 E 2.986 3251.76 6567.07 89.750 221.980 3928.28 4000.73 1452.57 S 2972.64 W 5998477.02 N 562783.71 E 1.024 3290.18 6615.58 87.280 220.600 3929.53 4001.98 1489.00 S 3004.64 W 5998440.31 N 562752.04 E 5.832 3332.70 6663.11 92.590 220.740 3929.59 4002.04 1525.04 S 3035.60 W 5998404.00 N 562721.39 E 11.176 3374.13 - 6713.33 92.530 221.180 3927.34 3999.79 1562.93 8 3068.49 W 5998365.82 N 562688.84 E 0.883 3417.99 6759.90 92.410 220,030 3925.34 3997.79 1598.25 8 3098.77 W 5998330.23 N 562658.87 E 2.481 3458.52 6810.31 92.530 220.020 3923.16 3995.61 1636.82 8 3131.16W 5998291.38 N 562626.82 E 0.239 3502.15 6855.53 94.020 224.730 3920.58 3993.03 1670.168 3161.58W 5998257.78 N 562596.70 E 1 0.908 3542.14 6904.28 93.770 228.410 3917.27 3989.72 1703.59 8 3196.89 W 5998224.04 N 562561.68 E 7.549 3586.76 6948.03 94.510 233.530 3914.11 3986.56 1731.068 3230.78 W 5998196.27 N 562528.04 E 11.794 3627.99 6997.71 95.750 236.240 3909.66 3982.11 1759.52 8 3271.25 W 5998167.45 N 562487.82 E 5.979 3675.76 7046.88 96.240 237.180 3904.53 3976.98 1786.36 8 3312.12 W 5998140.25 N 562447.18 E 2.147 3723.35 7096.10 94.570 241.660 3899.89 3972.34 1811.288 3354.30 W 5998114.96 N 562405.23 E 9.676 3771.50 7141.03 94.020 243.240 3896.52 3968.97 1832.00 8 3394.02 W 5998093.89 N 562365.69 E 3.714 3815.92 7189.30 93.640 243.800 3893.30 3965.75 1853.48 8 3437.13 W 5998072.04 N 562322.77 E 1 .400 3863.77 7237.34 93.890 242.580 3890.15 3962.60 1875.108 3479.91 W 5998050.04 N 562280.18 E 2.587 3911.37 7286.01 90.490 243.970 3888.29 3960.74 1896.96 S 3523.34 W 5998027.80 N 562236.94 E 7.546 3959.66 7333.43 90.430 243.630 3887.91 3960.36 1917.908 3565.89 W 5998006.49 N 562194.58 E 0.728 4006.80 7382.21 89.200 244.760 3888.06 3960.51 1939.138 3609.80 W 5997984.87 N 562150.86 E 3.424 4055.33 7429.84 88.830 245.360 3888.88 3961.33 1959.21 8 3652.99 W 5997964.41 N 562107.85 E 1 .480 4102.77 7478.18 92.220 248.360 3888.44 3960.89 1978.21 8 3697.42 W 5997945.02 N 562063.58 E 9.364 4151.03 7525.79 92.840 248.350 3886.34 3958.79 1995.758 3741.63 W 5997927.09 N 562019.53 E 1.302 4198.57 ~ 7576.17 94.200 251.000 3883.24 3955.69 2013.21 S 3788.78 W 5997909.21 N 561972.54 E 5.903 4248.85 7622.21 95.440 250.400 3879.37 3951.82 2028.38 8 3832.08 W 5997893.67 N 561929.37 E 2.990 4294,72 7668.85 94.200 251.870 3875.46 3947.91 2043.408 3876.06 W 5997878.26 N 561885.53 E 4.115 4341 .19 7716.76 95,010 251.730 3871.61 3944.06 2058.32 S 3921.42 W 5997862.94 N 561840.30 E 1.716 4388.92 7766.25 96.180 251.900 3866.78 3939.23 2073.69 8 3968.21 W 5997847.16 N 561793.64 E 2.389 4438.15 7813.03 95.500 253.270 3862.02 3934.47 2087.628 4012.62 W 5997832.84 N 561749.36 E 3.256 4484,63 7864.18 95.750 253.150 3857.01 3929.46 2102.32 S 4061.35 W 5997817.71 N 561700.76 E 0.542 4535.46 7909.42 95.440 251.470 3852.60 3925.05 2116.008 4104.24 W 5997803.65 N 561657.99 E 3.759 4580.44 7959.43 95.130 251.510 3847.99 3920.44 2131.818 4151.47W 5997787.43 N 561610.91 E 0,625 4630.22 8003.84 95.630 252.220 3843.83 3916.28 2145.578 4193.48 W 5997773.30 N 561569.02 E 1.950 4674.41 30 April, 2003 - 9:49 Page 20f4 Dril/Quest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24 MWD Your Ref: API 500292314200 Job No. AKMW0002399225. BP EXPLORA TJON (ALASKA) INC. Milne Point Unit Measured Sub-Sea Vertical Depth Inet. Azim. Depth Depth (ft) (ft) (ft) 8057.90 97.370 254.170 3837.71 3910.16 8100.54 97.620 254.480 3832.15 3904.60 8134.24 97.930 254.540 3827.59 3900.04 8205.00 97.q~0 254.540 3817.83 3890.28 Local Coordinates Northings Eastings (ft) (ft) 2161.10S 2172.53 S 2181.44 S 2200.12 S 4244.90 W 4285.60 W 4317.78 W 4385.33 W All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 250.000° (True). Magnetic Declination at Surface is 25.532°(16-Apr-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 8205.00ft., The Bottom Hole Displacement is 4906.28f1., in the Direction of 243.357° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings ~) ~ ~ Comment 6424.79 6446.00 8205.00 4000.16 3999.60 3890.28 1345.90 S 1361.61 S 2200.12 S 2878.52 W 2892.76 W 4385.33 W Tie On Point Window Point Projected Survey 30 April, 2003 - 9:49 Page 3 of4 Global Coordinates Northings Eastings (ft) (ft) 5997757.32 N 5997745.54 N 5997736.34 N 5997717.06 N 561517.74 E 561477.14 E 561445.04 E 561377.66 E BPXA Dogleg Vertical Rate Section (Of100ft) 4.817 0.929 0.937 0.000 Comment 4728.04 4770,19 4803.48 4873.34 Projected Survey ,,-,,' '-"" DrillQuest 3.03.02.005 BP EXPLORA nON (ALASKA) INC. Milne Point Unit Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24 MWD Your Ref: AP/500292314200 Job No. AKMW0002399225s BPXA Survey tool program for MPS-24 MWD Fro m Measured Vertical Depth Depth (ft) (ft) 0.00 543.00 0.00 542.98 30 April, 2003 - 9:49 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 543.00 8205.00 542.98 Tolerable Gyro (MPS-24PB1 Gyro) 3890.28 MWD Magnetic (MPS-24PB1 MWD) _/ -~ Page 4 of4 DrillQuest 3.03.02.005 ) AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-24 PB2 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 4,780.41' MD Window / Kickoff Survey: 4,874.00' MD (if applicable) Projected Survey: 6,760.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ) QC8--Œt 30-Apr-03 RECEIVED MAY 13 2003 Aiasita Oil & Gas Cons. Commisfion Andtorage Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-24PB2 ~ Job No. AKZZ0002399225, Surveyed: 23 April, 2003 Survey Report 30 April, 2003 Your Ref: API 500292314271 Surface Coordinates: 5999955.70 N, 565743.45 E (70024' 37.1616" N, 149027' 52.8093" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 '~~ Surface Coordinates relative to Project H Reference: 999955.70 N, 65743.45 E (Grid) Surface Coordinates relative to Structure: 14.00 S, 601.70 W (True) Kelly Bushing: 72.45ft above Mean Sea Level Elevation relative to Project V Reference: 72.45ft Elevation relative to Structure: 72.45ft Spe'-'''''Y-5UI'1 DRILLING SeRVlc:eS A Halliburton Company Survey Ref: svy1168 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24PB2 Your Ref: AP/500292314271 Job No. AKZZ0002399225. Surveyed: 23 April. 2003 BP EXPLORA TlON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 4 780A 1 72.650 219.140 3932.15 4004.60 96.06 S 1840.51 W 5999843.45 N 563903.85 E 1762.37 Tie On Point 4874.00 77.750 217 .590 3956.05 4028.50 166.99 S 1896.64 W 5999772.03 N 563848.35 E 5.679 1839.37 Window Point 4939.20 86.730 222.510 3964.85 4037.30 216.35 S 1938.18 W 5999722.29 N 563807.25 E 15.668 1895.29 4989.31 93.520 222.720 3964.74 4037.19 253.21 S 1972.09 W 5999685.14 N 563773.67 E 13.557 1939.76 5035.17 93.090 222.550 3962.09 4034.54 286.89 S 2003.10 W 5999651.19 N 563742.96 E 1.008 1980.42 5084.31 92.340 222.150 3959.77 4032.22 323.17 S 2036.16 W 5999614.62 N 563710.21 E 1.729 2023.90 5130.07 92.590 219.160 3957.80 4030.25 357.85 S 2065.94 W 5999579.68 N 563680.73 E 6.551 2063.74 '-" 5176.87 93.710 219.120 3955.23 4027.68 394.09 S 2095.44 W 5999543.18 N 563651.56 E 2.395 2103.86 5226.49 94.010 218.570 3951.88 4024.33 432.65 S 2126.49 W 5999504.35 N 563620.85 E 1.260 2146.22 5275.25 94.450 218.970 3948.29 4020.74 470.56 S 2156.94 W 5999466.17 N 563590.73 E 1.218 2187.80 5321.90 94.330 218.470 3944.72 4017.17 506.85 S 2186.04 W 5999429.63 N 563561.96 E 1.099 2227.56 5372.92 93.650 217.820 3941.17 4013.62 546.88 S 2217.47 W 5999389.33 N 563530.88 E 1.842 2270.79 5418.56 94.820 218.130 3937.80 4010.25 582.76 S 2245.48 W 5999353.20 N 563503.19 E 2.652 2309.37 5466.95 91.420 216.730 3935.16 4007.61 621.12 S 2274.84 W 5999314.58 N 563474.17 E 7.597 2350.09 5514.40 88.090 215.880 3935.37 4007.82 659.35 S 2302.93 W 5999276.10 N 563446.41 E 7.243 2389.56 5563.07 88.270 216.200 3936.91 4009.36 698.69 S 2331.55 W 5999236.52 N 563418.14 E 0.754 2429.91 5610.54 88.210 215.610 3938.37 4010.82 737.12 S 2359.38 W 5999197.84 N 563390.65 E 1.249 2469.20 5658.38 90.620 217.980 3938.86 4011.31 775.42 S 2388.02 W 5999159.29 N 563362.34 E 7.065 2509.22 5705.09 91.050 218.220 3938.18 4010.63 812.17 S 2416.84 W 5999122.28 N 563333.85 E 1.054 2548.87 5753.67 89.200 216.930 3938.07 4010.52 850.67 S 2446.47 W 5999083.52 N 563304.57 E 4.642 2589.87 5799.06 90.120 217.920 3938.34 4010.79 886.72 S 2474.05 W 5999047.24 N 563277.30 E 2.977 2628.12 5848.88 89.570 217.650 3938.48 4010.93 926.09 S 2504.57 W 5999007.60 N 563247.13 E 1.230 2670.27 5896.05 89.200 217.690 3938.98 4011.43 963.43 S 2533.40 W 5998970.01 N 563218.63 E 0.789 2710.13 5944.12 89.260 218.660 3939.63 4012.08 1001.21 S 2563.10 W 5998931.97 N 563189.26 E 2.022 2750.97 5992.23 91.910 219.550 3939.14 4011.59 1038.54 S 2593.45 W 5998894.37 N 563159.25 E 5.810 2792.24 ~ 6047.25 92.280 220.760 3937.13 4009.58 1080.56 S 2628.90 W 5998852.04 N 563124.16 E 2.298 2839.93 6087.04 91,540 220.500 3935.80 4008.25 1110.74 S 2654.80 W 5998821.63 N 563098.53 E 1.971 2874.59 6136.03 90.250 220.420 3935.03 4007.48 1148.01 S 2686.58 W 5998784.08 N 563067.08 E 2.638 2917.20 6182.95 91.540 220.020 3934.30 4006.75 1183.83 S 2716.88 W 5998748.00 N 563037.10 E 2.878 2957.92 6233.17 91.050 220.100 3933,17 4005.62 1222.26 S 2749.19 W 5998709.29 N 563005.13 E 0.989 3001.43 6278.95 91.540 220.530 3932.13 4004.58 1257.16 S 2778.80 W 5998674.13 N 562975.82 E 1.424 3041 .1 9 6326.44 90.620 220.170 3931.24 4003.69 1293.34 S 2809.54 W 5998637.68 N 562945.40 E 2.080 3082.45 6375.42 92.960 221.350 3929.71 4002.16 1330.42 S 2841.50 W 5998600.32 N 562913.77 E 5.350 3125.17 6424.79 91.670 221.340 3927.71 4000.16 1367.46 S 2874.09 W 5998563.00 N 562881.51 E 2.613 3168.46 6471.91 90.990 221.180 3926.62 3999.07 1402.87 S 2905.15 W 5998527.31 N 562850.76 E 1 .483 3209.76 --~--~-----~_._- 30 April, 2003 - 9:48 Page 20f4 DrillQLJest 3.03.02.005 BP EXPLORA nON (ALASKA) INC. Milne Point Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) 6520.77 90.430 220.920 3926.01 3998.46 6566.12 94.760 223.450 3923.96 3996.41 6616.17 94.630 223.850 3919.86 3992.31 6662.20 96.500 225.120 3915.40 3987.85 6760.00 96.500 225.120 3904.33 3976.78 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24PB2 Your Ref: AP/500292314271 Job No. AKZZ0002399225, Surveyed: 23 April, 2003 BPXA Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (0/100ft) 1439.71 S 2937.24 W 5998490.19 N 562819.00 E 1.264 3252.51 1473.27 S 2967.65 W 5998456.36 N 562788.88 E 11.055 3292.57 1509.36 S 3002.08 W 5998419.97 N 562754.77 E 0.838 3337.27 1542.05 S 3034.18 W 5998387.00 N 562722.96 E 4.904 3378.61 1610.61 S 3103.03 W 5998317.83 N 562654.71 E 0.000 3466.76 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. ~' The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 250.000° (True). Magnetic Declination at Surface is 25.532°(16-Apr-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 6760.00ft., The Bottom Hole Displacement is 3496.13ft., in the Direction of 242.569° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 4780.41 4874.00 6760.00 96.06 S 166.99 S 1610.61 S 1840.51 W 1896.64 W 3103.03 W 4004.60 4028.50 3976.78 30 April, 2003 - 9:48 Comment Tie On Point Window Point Projected Survey .--- Page 3 of4 Dri/lQuest 3.03.02.005 BP EXPLORA TION (ALASKA) INC. Milne Point Unit Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24PB2 Your Ref: API 500292314271 Job No. AKZZ0002399225, Surveyed: 23 April, 2003 BPXA Survey tool program for MPS-24PB2 Fro m Measured Vertical Depth Depth (ft) (ft) 0.00 543.00 0.00 542.98 30 April, 2003 - 9:48 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 543.00 6760.00 542.98 Tolerable Gyro (MPS-24PB1 Gyro) 3976.78 AK-6 BP _IFR-AK (MPS-24PB1) ~' '-' Page 4 of4 DrillQuest 3.03.02.005 ) AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-24 PB2 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 4,780.41' MD Window / Kickoff Survey: 4,874.00 I MD (if applicable) Projected Survey: 6,760.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ) ó?Ù3--ò3 ~ 30-Apr-03 RF 0 r: í\J"¡:: f) .. .. ",.. R ~ r-.'''' ~ '1 . ~. ~...". ""''''''' ""rf ,,,,,,,,.. ~~I\ '1 '\ 3 2003 , t)· \ ;I ,-, c;;: ('i"jî'¡S i...-:.onhl,~\n AlaSM\ \ í¡ <',;. \::I~' ~",1 , " . ÞJ'CÌ\~J?r Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-24PB2 MWD - Job No. AKMW0002399225, Surveyed: 23 April, 2003 Survey Report 30 April, 2003 Your Ref: API 500292314271 Surface Coordinates: 5999955.70 N, 565743.45 E (70024' 37.1616" N. 149027' 52.8093" W) Grid Coordinate System: NAD27 Alaska State Planes. Zone 4 ~ Surface Coordinates relative to Project H Reference: 999955.70 N, 65743.45 E (Grid) Surface Coordinates relative to Structure: 14.00 S. 601.70 W (True) Kelly Bushing: 72.45ft above Mean Sea Level Elevation relative to Project V Reference: 72.45ft Elevation relative to Structure: 72.45ft 5~="""'-'Y-5U" DRILLING seRVices A Halliburton Company Survey Ref: svy1174 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24PB2 MWD Your Ref: APlS00292314271 Job No. AKMW0002399225, Surveyed: 23 April, 2003 BP EXPLORA nON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 4780.41 72.650 219.920 3932.14 4004.59 78.91 S 1839.63 W 5999860.60 N 563904.58 E 1755,68 Tie On Point 4874.00 77.750 218.000 3956.05 4028.50 149.26 S 1896.49 W 5999789.76 N 563848.34 E 5.799 1833.17 Window Point 4939.20 86.730 222.510 3964.84 4037.29 198.48 S 1938.21 W 5999740.17 N 563807.07 E 15.381 1889.20 4989.31 93.520 222.320 3964.74 4037.19 235.45 S 1971.98W 5999702.90 N 563773.61 E 13.555 1933.59 5035.17 93.090 221.900 3962.09 4034.54 269.42 S 2002.69 W 5999668.67 N 563743.21 E 1.310 1974,05 5084.31 92.340 220.540 3959.76 4032.21 306.34 S 2035.03 W 5999631.46 N 563711.20 E 3,158 2017.07 5130.07 92.590 218.080 3957.80 4030.25 341.71 S 2063.99 W 5999595.84 N 563682.55 E 5.399 2056.39 ~ 5176.87 93.710 218.260 3955.22 4027.67 378.44 S 2092.87 W 5999558.85 N 563653.99 E 2.424 2096.09 5226.49 94.010 217.680 3951.88 4024.33 417.47 S 2123.33 W 5999519.55 N 563623.88 E 1.314 2138.06 5275.25 94.450 218.310 3948.29 4020.74 455.79 S 2153.26 W 5999480.97 N 563594.28 E 1.573 2179.29 5321.90 94.330 217.940 3944.72 4017.17 492.38 S 2181.98 W 5999444.13 N 563565.89 E 0.832 2218.79 5372.92 93.650 217.590 3941.17 4013.62 532.62 S 2213.15W 5999403.62 N 563535.08 E 1.498 2261.84 5418.56 94.820 218.180 3937.80 4010.25 568.54 S 2241.10 W 5999367.46 N 563507.45 E 2.869 2300.39 5466.95 91.420 216.810 3935.16 4007.61 606.87 S 2270.50 W 5999328.87 N 563478.38 E 7.573 2341 .14 5514.40 88.090 216.180 3935.36 4007.81 645.01 S 2298.72 W 5999290.48 N 563450.50 E 7.142 2380.69 5563.07 88.270 216.520 3936.91 4009.36 684.19 S 2327.55 W 5999251.05 N 563422.01 E 0.790 2421.19 5610.54 88.210 216.250 3938.37 4010.82 722.39 S 2355.70 W 5999212.61 N 563394.20 E 0.582 2460.70 5658,38 90.620 218.590 3938.86 4011.31 760.37 S 2384.76W 5999174.36 N 563365.4 7 E 7.021 2501,01 5705.09 91.050 218.560 3938.18 4010.63 796.89 S 2413.88 W 5999137.60 N 563336.67 E 0.923 2540.86 5753.67 89.200 217.650 3938.07 4010.52 835.11 S 2443.86 W 5999099.11 N 563307.03 E 4.244 2582.10 5799.06 90.120 218.420 3938.34 4010.79 870.86 S 2471.83W 5999063.11 N 563279.38 E 2.643 2620.61 5848.88 89.570 218.090 3938.47 4010.92 909.98 S 2502.67 W 5999023.72 N 563248.88 E 1.287 2662.98 5896.05 89.200 218.110 3938.98 4011.43 947.10 S 2531.78 W 5998986.35 N 563220.11 E 0.786 2703.02 5944.12 89.260 219.280 3939.63 4012.08 984.61 S 2561.83 W 5998948.57 N 563190.39 E 2.437 2744.09 5992.23 91.910 220.200 3939.14 4011.59 1021.60 S 2592.58 W 5998911.32 N 563159.96 E 5.831 2785.64 - 6047.25 92.280 221.800 3937.12 4009.57 1063.10 S 2628.65 W 5998869.51 N 563124.26 E 2.983 2833.72 6087.04 91.540 221.380 3935.80 4008.25 1092.84 S 2655.05 W 5998839.53 N 563098.13 E 2.138 2868.70 6136.03 90.250 221.1 20 3935.03 4007.48 1129.67 S 2687.34 W 5998802.42 N 563066.15 E 2.686 2911.65 6182.95 91.540 221.070 3934.30 4006.75 1165.02 S 2718.18 W 5998766.80 N 563035.63 E 2.751 2952.71 6233.17 91.050 220.680 3933.16 4005.61 1202.99 S 2751.04 W 5998728.55 N 563003.11 E 1.247 2996.57 6278.95 91.540 221.000 3932.13 4004.58 1237.61 S 2780.97 W 5998693.66 N 562973.49 E 1.278 3036.54 6326.44 90.620 221.580 3931.24 4003.69 1273.29 S 2812.30 W 5998657.71 N 562942.4 7 E 2.290 3078.18 6375.42 92.960 222.380 3929.71 4002.16 1309.68 S 2845.04 W 5998621.03 N 562910.05 E 5.049 3121.40 6424.79 91.670 223.120 3927.71 4000.16 1345.90 S 2878.52 W 5998584.51 N 562876.88 E 3,012 3165.25 6471.91 90.990 222.800 3926.62 3999.07 1380.37 S 2910.63 W 5998549.76 N 562845.09 E 1.595 3207.21 --- ---------~- 30 April, 2003 - 9:48 Page 2 0(4 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Swvey Report for Milne Point MPS - MPS-24P82 MWD Your Ref: AP/500292314271 Job No. AKMW0002399225, Surveyed: 23 April, 2003 BP EXPLORA T/ON (ALASKA) INC. Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) ·(ft) (ft) (ft) 6520.77 90.430 221.700 3926.01 3998.46 1416.54 S 2943.48 W 5998513.31 N 562812.56 E 6566.12 94.760 223.820 3923.96 3996.41 1449.79 S 2974.22 W 5998479.78 N 562782.10 E 6616.17 94.630 224.860 3919.86 3992.31 1485.47 S 3009.09 W 5998443.80 N 562747.56 E 6662.20 96.500 226.090 3915.40 3987.85 1517.59 S 3041.75 W 5998411.39 N 562715.18 E 6760.00 9fUJOO 226.090 3904.33 3976.78 1584.98 S 3111.75W 5998343.39 N 562645.77 E All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 250.000° (True). Magnetic Declination at Surface is 25.532°(16-Apr-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 6760.00ft., The Bottom Hole Displacement is 3492.16ft., in the Direction of 243.008° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings ffl) ~ ~ Comment 4780.41 4874.00 6760.00 78.91 S 149.26 S 1584.98 S 1839.63 W 1896.49 W 3111.75W Tie On Point Window Point Projected Survey 4004.59 4028.50 3976.78 30 April, 2003 - 9:48 Page 3 of4 Dogleg Rate (0/100ft) 2.526 10.628 2.087 4.856 0.000 BPXA Vertical Section Comment 3250.45 3290.71 3335.68 3377.35 3466.18 Projected Survey .~ ~ ---- DrillQuest 3.03.02.005 -- .~ BP EXPLORA nON (ALASKA) INC. Milne Point Unit Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24PB2 MWD Your Ref: APi 500292314271 Job No. AKMW0002399225, Surveyed: 23 April, 2003 BPXA Survey tool program for MPS-24PB2 MWD Fro m Measured Vertical Depth Depth (ft) (ft) 0.00 543.00 0.00 542.98 30 April, 2003 - 9:48 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 543.00 6760.00 542.98 Tolerable Gyro (MPS-24PB1 Gyro) 3976.78 MWD Magnetic (MPS-24PB1 MWD) ~ - ----.--------- Page 4 of4 DríllQuest 3.03.02.005 ) \ J aD3-'â5~ 30-Apr-03 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-24PB 1 Gyro Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD (if applicable) 0.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Su rvey Manager Attachment(s) RECEIVED MAY 13 2003 Alaska o¡~ & Gas \ :r,,¡-.. . .. . . -- It). VU¡ í ¡mISSIOn Anchorage Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-24PB1 Gyro ,-,' Job No. AKF00002399225, Surveyed: 20 April, 2003 Survey Report 30 April, 2003 Your Ref: API 500292314270 Surface Coordinates: 5999955.70 N, 565743.45 E (70024' 37.1616" N, 149027' 52.8093" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 ~. Surface Coordinates relative to Project H Reference: 999955.70 N, 65743.45 E (Grid) Surface Coordinates relative to Structure: 14.00 S, 601.70 W (True) Kelly Bushing: 72.45ft above Mean Sea Level Elevation relative to Project V Reference: 72.45ft Elevation relative to Structure: 72.45ft 5p1!!r"'-'Y-SUf1 DRILLING SERVICES A Halliburton Company Survey Ref: svy1158 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24PB1 Gyro Your Ref: API 500292314270 Job No. AKF00002399225, Surveyed: 20 April, 2003 BP EXPLORA TION (ALASKA) INC. Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 0.00 0.000 0.000 -72.45 0.00 0.00 N 0.00 E 5999955.70 N 565743.45 E 0.00 Tolerable Gyro 186.00 0.300 28.000 113.55 186.00 0.43 N 0.23 E 5999956.13 N 565743.67 E 0.161 -0.36 274.00 0.300 190.000 201.55 274.00 0.41N 0.30 E 5999956.11 N 565743.74 E 0,673 -0.42 363.00 0.700 189.000 290.55 363.00 0.36 S 0.17 E 5999955.34 N 565743.62 E 0.450 -0.04 453.00 0,700 190.000 380.54 452.99 1 .44 S 0.01 W 5999954.26 N 565743.45 E 0.014 0.50 543.00 0.850 271.000 470.53 542.98 1.97 S 0.77W 5999953.72 N 565742.69 E 1.126 1.40 BPXA ~ All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 250.000° (True). Magnetic Declination at Surface is 25.532°(16-Apr-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 543.00ft., The Bottom Hole Displacement is 2.12ft., in the Direction of 201.388° (True). Survey tool program for MPS-24PB1 Gyro Fro m Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) .-' 0.00 0.00 543.00 542.98 Tolerable Gyro 30 April, 2003 - 9:48 Page 20f2 DrillQuest 3.03.02.005 ) AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-24PB1 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 5,033.00' MD (if applicable) ). aè3-ò3'r 30-Apr-03 Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) R r- I"·\\\J...... "IE' - D L r-.... ,\ ~ P-' g Iæ¡¡.. ~,p J....,." .,' MAY 13 2003 Aiask'JO;'; 8,Ci8(:3 C;Qn\)., C+Jrr.·ml~n J~t:~ìJrjr~ Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-24PB1 -' Job No. AKZZ0002399225, Surveyed: 20 April, 2003 Survey Report 30 April, 2003 Your Ref: API 500292314270 Surface Coordinates: 5999955.70 N, 565743.45 E (70024' 37.1616" N, 149027' 52.8093" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 -. Surface Coordinates relative to Project H Reference: 999955.70 N, 65743.45 E (Grid) Surface Coordinates relative to Structure: 14.00 S, 601.70 W (True) Kelly Bushing: 72.45ft above Mean Sea Level Elevation relative to Project V Reference: 72.45ft Elevation relative to Structure: 72.45ft 5~""''''''Y-5U'' DRILLING seRVices A Halliburton Company Survey Ref: svy1159 - Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24PB1 Your Ref: AP/500292314270 Job No. AKZZ0002399225, Surveyed: 20 April, 2003 BP EXPLORA TlON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 543.00 0.850 271.000 470.53 542.98 1.97 S 0.77W 5999953.72 N 565742.69 E 1.40 AK-6 BP _IFR-AK 661.41 2.980 303.090 588.87 661.32 0.28 S 4.23W 5999955.38 N 565739.22 E 1.946 4.07 758.08 3.250 313.190 685.40 757.85 2.97 N 8.33W 5999958.60 N 565735.09 E 0.632 6.82 853.68 4.710 308.380 780.77 853.22 7.26N 13.39 W 5999962.84 N 565730.00 E 1.565 10.10 949.76 8.030 301.920 876.24 948.69 13.26 N 22.18 W 5999968.76 N 565721.16 E 3.530 16.30 1045,14 10.380 301.820 970.39 1042.84 21.31 N 35.13 W 5999976.70 N 565708.13 E 2.464 25.73 1141 .27 12.320 302.370 1064.63 1137.08 31.37 N 51.16W 5999986.62 N 565692.02 E 2.021 37.34 ~--,. 1237.52 14.290 300.260 1158.29 1230.74 42.86 N 70.09 W 5999997.94 N 565672.98 E 2.108 51.21 1331.56 16.100 300.410 1249.04 1321.49 55.31 N 91.36 W 6000010.20 N 565651.60 E 1.925 66.94 1428.05 16.580 303.490 1341.64 1414.09 69.68 N 114.38 W 6000024.37 N 565628.46 E 1.026 83.66 1523.80 17.170 303.220 1433.26 1505.71 84.96 N 137.60 W 6000039.44 N 565605.11 E 0.622 100.25 1620.37 17.430 304.350 1525.47 1597.92 100.93 N 161.47W 6000055.20 N 565581.10 E 0.440 117.21 1715.93 17.250 305.060 1616.68 1689.13 117.14N 184.88 W 6000071.21 N 565557.55 E 0.291 133.67 1812.67 18.230 302.520 1708.82 1781.27 133.52 N 209.38 W 6000087.37 N 565532.90 E 1.291 151.09 1909.35 17.450 302.480 1800.85 1873.30 149.43 N 234.36 W 6000103.06 N 565507.78 E 0.807 169.12 2004.65 19.450 298.620 1891.25 1963.70 164.71 N 260.35 W 6000118.11 N 565481.66 E 2.458 188.31 2101.40 22.830 293.900 1981.49 2053.94 180.03 N 291.66 W 6000133.16 N 565450.22 E 3.909 212.50 2197.90 27.710 292.780 2068.73 2141.18 196.31 N 329.48 W 6000149.11 N 565412.25 E 5.081 242.4 7 2292.56 29.880 293.350 2151.68 2224.13 214.18 N 371.43 W 6000166.60 N 565370.15 E 2.311 275.77 2389.71 30.230 294.620 2235.76 2308.21 233.96 N 415.88 W 6000185.99 N 565325.53 E 0.747 310.78 2483.11 31.410 294.010 2315.97 2388.42 253.66 N 459.49 W 6000205.31 N 565281.75 E 1.307 345.02 2579.64 32.090 296.220 2398.06 2470.51 275.23 N 505.47 W 6000226.47 N 565235.58 E 1.395 380.85 2658.71 32.760 293.160 2464.81 2537.26 292.92 N 543.98 W 6000243.82 N 565196.91 E 2.241 410.99 2768.80 34.050 287.290 2556.73 2629.18 313.80 N 600.81 W 6000264.20 N 565139.90 E 3.159 457.25 2865.98 33.780 285.950 2637.38 2709.83 329.31 N 652.77 W 6000279.25 N 565087.81 E 0.818 500.77 ~ 2958.25 33.540 286.560 2714.18 2786.63 343.63 N 701.87 W 6000293.14 N 565038.59 E 0.449 542.01 3055.35 33.560 284.310 2795.11 2867.56 357.91 N 753.59 W 6000306.96 N 564986.74 E 1 .281 585.73 3151.49 33.390 280.660 2875.31 2947.76 369.37 N 805.34 W 6000317.97 N 564934.89 E 2.101 630.44 3247.91 33.240 278.830 2955.88 3028.33 378.33 N 857.53 W 6000326.47 N 564882.63 E 1.054 676.41 3342.17 33.690 275.450 3034.53 3106.98 384.78 N 909.08 W 6000332.47 N 564831.01 E 2.034 722.66 3438.09 33.900 269.520 3114.26 3186.71 387.09 N 962.33 W 6000334.30 N 564777.75 E 3.445 771.90 3532.03 35.110 264.460 3191.69 3264.14 384.26 N 1015.43 W 6000331.01 N 564724.68 E 3.311 822.77 3627.98 37.610 258.740 3268.97 3341.42 375.87 N 1071.63 W 6000322.13 N 564668.55 E 4.389 878.45 3723.89 41 . 1 90 254.980 3343.09 3415.54 361.97 N 1130.87 W 6000307.70 N 564609.44 E 4.485 938.87 3819.40 43.410 254.660 3413.72 3486.17 345.13 N 1192.90 W 6000290.32 N 564547.56 E 2.335 1002.91 30 April, 2003 - 9:48 Page 2 0'4 DrillQuest 3.03.02.005 - Sperry-Sun Drilling Services Survey Report for Milne Point MPS . MPS-24PB1 Your Ref: AP/500292314270 Job No. AKZZ0002399225, Surveyed: 20 April, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100tt) 3915.43 44.620 250.700 3482.80 3555.25 325.25 N 1256.56 W 6000269.88 N 564484.07 E 3.130 1069.54 4011.30 47.870 246.920 3549.10 3621.55 300.18 N 1321.07 W 6000244.24 N 564419.78 E 4.426 1138.74 4107.48 50.660 244.180 3611.87 3684.32 269.99 N 1387.38 W 6000213.47 N 564353.74 E 3.615 1211.37 4203.98 52.840 240.570 3671.62 3744.07 234.83 N 1454.49 W 6000177.72 N 564286.95 E 3.705 1286.46 4295.39 56.400 236,900 3724.55 3797.00 196.12N 1518.14 W 6000138.45 N 564223.64 E 5.087 1359.51 4395.14 60.120 232.760 3777 .03 3849.48 147.23 N 1587.41 W 6000088.95 N 564154.80 E 5.134 1441.32 4491.40 63.120 229.870 3822.78 3895.23 94.29 N 1653.49 W 6000035.43 N 564089.20 E 4.085 1521.52 -' 4587.25 66.450 225.870 3863.63 3936.08 36.11 N 1717.74 W 5999976.69 N 564025.46 E 5.130 1601.80 4683.63 68.880 223.350 3900.25 3972.70 27.36 S 1780.33 W 5999912.67 N 563963.43 E 3.493 1682.32 4780.41 72.650 219.140 3932.15 4004.60 96.06 S 1840.51 W 5999843.45 N 563903.85 E 5.660 1762.37 4874.09 77.750 217.590 3956.07 4028.52 167.05 S 1896.70 W 5999771.96 N 563848.30 E 5.674 1839.45 4968.54 77.1 90 218.720 3976.56 4049.01 239.55 S 1953.66 W 5999698.96 N 563791.98 E 1.310 1917.77 5033.00 77.190 218.720 3990.85 4063.30 288.60 S 1992.97 W 5999649.57 N 563753.10 E 0.000 1971.49 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 250.000° (True). Magnetic Declination at Surface is 25.532°(16-Apr-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 5033.00ft., The Bottom Hole Displacement is 2013.76f1., in the Direction of 261.760° (True). ~ 30 April, 2003 - 9:48 Page 3 of4 Dril/Quest 3.03.02.005 ., ... Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24PB1 Your Ref: API 500292314270 Job No. AKZZ0002399225, Surveyed: 20 April, 2003 BP EXPLORA TlON (ALASKA) INC. Milne Point Unit BPXA Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 5033.00 4063.30 288.60 S 1992.97 W Projected Survey ~ Survey tool program for MPS-24PB1 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 543.00 0.00 542.98 543.00 5033.00 542.98 Tolerable Gyro (MPS-24PB1 Gyro) 4063.30 AK-6 BP _IFR-AK (MPS-24PB1) _I 30 April, 2003 - 9:48 Page 4 0(4 DrillQuest 3.03.02.005 ) AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 ) a03~~ 30-Apr-03 Re: Distribution of Survey Data for Well MPS-24 PB 1 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 5,033.00' MD 0.00' MD 0.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED MAY 13 2003 Ai.a OH & Gas Cons. CommiMion Anchcnge Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-24PB1 MWD '-' Job No. AKMW0002399225, Surveyed: 20 April, 2003 Survey Report 30 April, 2003 Your Ref: API 500292314270 Surface Coordinates: 5999955.70 N, 565743.45 E (70024' 37.1616" N, 149027' 52.8093" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 -' Surface Coordinates relative to Project H Reference: 999955.70 N, 65743.45 E (Grid) Surface Coordinates relative to Structure: 14.00 S, 601.70 W (True) Kelly Bushing: 72.45ft above Mean Sea Level Elevation relative to Project V Reference: 72.45ft Elevation relative to Structure: 72.45ft 5pe""'''''y-!5ul'l DRILLING seRVices A Halliburton Company Survey Ref: svy1173 ..,- Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24PB1 MWD Your Ref: AP/SOO292314270 Job No. AKMW0002399225, Surveyed: 20 April, 2003 BP EXPLORA nON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 543.00 0.850 271.000 470.53 542.98 1.97 S 0.77W 5999953.72 N 565742.69 E 1.40 MWD Magnetic 661.41 2.980 303.150 588.87 661.32 0.28 S 4.23W 5999955.39 N 565739.22 E 1.947 4.07 758.08 3.250 313.350 685.40 757.85 2.98 N 8.33W 5999958.61 N 565735.10 E 0,637 6.80 853.6R 4.710 308.920 780.77 853.22 7.31 N 13.35 W 5999962.89 N 565730.04 E 1.560 10.05 949.76 8.030 302.300 876.24 948.69 13.37 N 22.09 W 5999968.88 N 565721.24 E 3.533 16.19 1045.14 10.380 302.260 970.39 1042.84 21.52 N 34.99 W 5999976.91 N 565708.27 E 2.464 25.52 1141.27 12.320 302.720 1064.63 1137.08 31.69 N 50.95 W 5999986.94 N 565692.23 E 2.020 37,04 ~ 1237.52 14.290 300.690 1158.29 1230.74 43.30 N 69.80 W 5999998.38 N 565673.27 E 2.103 50.78 1331.56 16,100 300.850 1249.04 1321.49 55.91 N 90.98 W 6000010.81 N 565651.98 E 1.925 66.37 1428.05 16.580 304.480 1341.64 1414.09 70.57 N 113.81 W 6000025.26 N 565629.02 E 1.169 82.81 1523.80 17.170 304.130 1433.26 1505.71 86.23 N 136.77 W 6000040.72 N 565605.92 E 0.625 99.03 1620.37 17.430 304.880 1525.47 1597.92 1 02.50 N 160.44 W 6000056.78 N 565582.12 E 0.355 115.71 1715.93 17.250 305.680 1616.68 1689.13 118.95 N 183.69 W 6000073.03 N 565558.72 E 0.313 131.93 1812.67 18.230 303.060 1708.82 1781.27 135.57 N 208.02 W 6000089.43 N 565534.24 E 1.306 149.11 1909.35 17.450 302.820 1800.85 1873.30 151.68 N 232.88 W 6000105.32 N 565509.24 E 0.810 166.96 2004.65 19.450 300.180 1891.25 1963.70 167.40 N 258.61 W 6000120.82 N 565483.38 E 2.274 185.76 2101.40 22.830 294.170 1981.49 2053.94 183.19 N 289.67 W 6000136.33 N 565452.18 E 4.146 209.54 2197.90 27.710 294.150 2068.73 2141.18 200.04 N 327.24 W 6000152.85 N 565414.46 E 5.057 239.09 2292.56 29.880 293.920 2151.68 2224.13 218.61 N 368.88 W 6000171.05 N 565372.66 E 2.295 271.87 2389.71 30.230 294.710 2235.77 2308.22 238.64 N 413.22 W 6000190.70 N 565328.14 E 0.544 306.68 2483.11 31.410 292.760 2315.98 2388.43 257.89 N 457.03 W 6000209.56 N 565284.17 E 1.655 341.26 2579.64 32.090 295.520 2398.07 2470.52 278.67 N 503.36 W 6000229.93 N 565237.65 E 1.661 377.70 2658.71 32.760 292.560 2464.81 2537.26 295.93 N 542.08 W 6000246.84 N 565198.79 E 2.179 408.17 2768.80 34.050 288.490 2556.72 2629.17 317.13 N 598.82 W 6000267.55 N 565141.86 E 2.348 454.24 2865.98 33.780 287.360 2637.37 2709.82 333.82 N 650.41 W 6000283.78 N 565090.13 E 0.706 497.01 -- 2958.25 33.540 287.850 2714.17 2786.62 349.29 N 699.16 W 6000298.82 N 565041.25 E 0.393 537.53 3055.35 33.560 286.140 2795.10 2867.55 364.97 N 750.47 W 6000314.05 N 564989.79 E 0.973 580.39 3151.49 33.390 281.710 2875.30 2947.75 377.73 N 801.91 W 6000326.36 N 564938.25 E 2,547 624.36 3247.91 33.240 280.080 2955.88 3028.33 387.74 N 853.91 W 6000335.91 N 564886.16 E 0.941 669.80 3342.17 33.690 276.350 3034.52 3106.97 395.15 N 905.33 W 6000342.87 N 564834.67 E 2.233 715.58 3438.09 33.900 270.340 3114.26 3186.71 398.26 N 958.54 W 6000345.50 N 564781.44 E 3.491 764,52 3532.03 35.110 265.170 3191.69 3264.14 396.14 N 1011.67 W 6000342.92 N 564728.34 E 3.372 815.17 3627.98 37.610 258.870 3268.98 3341 .43 388.16 N 1067.92 W 6000334.44 N 564672.16 E 4.681 870.76 3723.89 41 .190 255.630 3343.08 3415.53 374.66 N 1127.25 W 6000320.43 N 564612.94 E 4.304 931 .1 3 3819.40 43.410 255.620 3413.72 3486.17 358.71 N 1189.52 W 6000303.92 N 564550.82 E 2.324 995.09 ------------~------- ------.--------- 30 April, 2003 - 9:48 Page 2 of 4 DrillQuest 3.03.02.005 ~ Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24PB1 MWD Your Ref: AP/S00292314270 Job No. AKMW0002399225, Surveyed: 20 April, 2003 BP EXPLORA TlON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 3915.43 44.620 251.600 3482.80 3555.25 339.86 N 1253.50 W 6000284.52 N 564487.01 E 3.169 1061.66 4011.30 47.870 247.030 3549.11 3621.56 315.35 N 1318.21 W 6000259.43 N 564422.52 E 4.830 1130.86 4107.48 50.660 243.920 3611.87 3684.32 285.07 N 1384.47 W 6000228.57 N 564356.52 E 3.797 1203.48 4203.98 52.840 240.370 3671.62 3744.07 249.64 N 1451.44 W 6000192.56 N 564289.87 E 3.667 1278.52 4295.39 56.400 236.940 3724.55 3797.00 210.85 N 1515.04 W 6000153.20 N 564226.61 E 4.952 1351,56 4395.14 60.120 233.460 3777.03 3849.48 162.41 N 1584.64 W 6000104.15 N 564157.44 E 4.765 1433.53 4491.40 63.120 229.960 3822.79 3895.24 109.92 N 1651.07 W 6000051.08 N 564091 .48 E 4.466 1513.90 ~ 4587.25 66.450 226.700 3863.63 3936.08 52.26 N 1715.80 W 5999992.86 N 564027.26 E 4.640 1594.45 4683.63 68.880 223.470 3900.26 3972.71 10.68 S 1778.90 W 5999929.36 N 563964.71 E 3.995 1675.27 4780.41 72.650 219.920 3932.14 4004.59 78.91 S 1839.63 W 5999860.60 N 563904.58 E 5.212 1755.68 4874.09 77 .750 218.000 3956.07 4028.52 149.32 S 1896.55 W 5999789.69 N 563848.29 E 5.793 1833.24 4968.54 77 .190 218.400 3976.56 4049.01 221.78 S 1953.56 W 5999716.73 N 563791.91 E 0.723 1911.60 5033.00 77 .190 218.400 3990.85 4063.30 271.04 S 1992.61 W 5999667.13 N 563753.31 E 0.000 1965.14 Tie On Point All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 250.000° (True). Magnetic Declination at Surface is 25.531 0(16-Apr-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 5033.00ft., The Bottom Hole Displacement is 2010.96ft., in the Direction of 262.254° (True). '-' 30 April, 2003 - 9:48 Page 3 0'4 DriflQuest 3.03.02.005 -- Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-24PB1 MWD Your Ref: API 500292314270 Job No. AKMW0002399225, Surveyed: 20 April, 2003 BP EXPLORA nON (ALASKA) INC. Milne Point Unit BPXA Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 5033.00 4063.30 271.04 S 1992.61 W Tie On Point .~ Survey tool program for MPS-24PB1 MWD From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 543.00 0.00 542.98 543.00 5033.00 542.98 Tolerable Gyro (MPS-24PB1 Gyro) 4063.30 MWD Magnetic (MPS-24PB1 MWD) --' -------~---- 30 April, 2003 - 9:48 Page 4 of 4 DrillQuest 3.03.02.005 ) ) /)03-0:% I crc¡~ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Corom. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 May 21, 2003 RE: MWDFotmation Evaluation Logs MPS-24 PB2, AK-MW-2399225 1 LIS formatted Disc with verification listing. API#: 50-029-23142-71 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99648 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: ~ - ~~ Signed: ~Ç)~' ~ f'{,,--~ \,~"r"\.. R,ECEIVED JUN 0 2 2003 ~~~,\\~~ AJasK8 o;·¡ (~GSß CC;;'í~i. ~~caìmi~~n J.\nG~~10r~.j~~ \ ) ) /)03 --030- 1 \~qT WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 May 21,2003 RE: MWD Formation Evaluation Logs MPS-24 PH 1, AK-MW-2399225 1 LIS fonnatted Disc with verification listing. API#: 50-029-23142-70 PLEASE ACKNOWLEDGE RECEIPT .BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Atln: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99648 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: Sign~\ ~,~'"º~ ~~ECEIVED JUN 0 2 2003 ~~~\\\~ J~a5ka 0;.; & Gs.s ·Com:. Commiseton if\nchof!!fle ) ) 803 -Q3 c5 " g q¿p WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 May 21, 2003 RE:MWD Formation Evaluation LogsMPS-24, AK-MW-2399225 1 LIS formatted Disc with verification listing. API#: 50-029-23142-00 PLEASE ACKNOW.LEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99648 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: S· ed~· \ - "~, < tgn : \ "e~~ '--'-...JY\' '--..) '- C. (~;:::::;>~.)~ r'ì~=~ (~ t: J \ l~. = ""~."" t" t: ~~ ~=~1 ~ I~þ' E U JU· ~,! O? ~ ('Ii"""J, ~ t ,-.L. '.;J, \} ~..' ~K~~~ ~ f,,: ( ) (~.'~ 1i[Æ'li' [ ñj li·~ Ii Ie: \_ u ...J ....:::z ~""E I~IJ !Æ'~!Æ~~«!Æ FRANK H. MURKOWSKI, GOVERNOR . AIIA~HA. OIL AND GAS CONSERVATION COMMISSION 333 W. -rm AVENUE, SUITE 100 ANCHORAGE. ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276·7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519 Re: Milne Point Unit !v1PS-24 BP Exploration (Alaska), Inc. Permit No: 203-038 Surface Location: 3289' NSL, 267' WEL, Sec, 12, TI2N, R10E, UM Bottomhole Location: 1092' NSL, 4628' WEL, Sec. 12, T12N, R10E, UM Dear Mr. Archey: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, ~~ ~/~~ Randy Ruedrich Commissioner BY ORDER OF THE COMMISSION DATED this~day of March, 2003 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Exploration, Production and Refineries Section 1 a. Type of work 181 Drill 0 Redrill ORe-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99p19-6612 4. Location of well at surface x = 565743, Y = 5999956 3289' NSL, 267' WEL, SEC. 12, T12N, R10E, UM At top of productive interval x = 563861, Y = 5999750 3099' NSL, 2152' WEL, SEC. 12, T12, R10E, UM At total depth x = 561402, Y = 5997722 1092' NSL, 4628' WEL, SEC. 12, T12N, R10E, UM ) STATE OF ALASKA) t/. ALASKA OIL AND GAS CONSERVATION COMMISSION , ~ I í , PERMIT TO DRILL _,-I) '3/,¿,.j6:' 20 AAC 25.005 ì1! 1 b. Type of well 0 Exploratory 0 Stratigraphic Test B Development Oil o Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool Planned KBE = 72' Milne Point Unit / Schrader 6. Property Designation Bluff ADL 380109 7. Unit or Property Name Milne Point Unit 8. Well Number MPS-24 9. Approximate spud date 04/03/03 Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 8219' MD 13897' TVD o 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} 95 Maximum surface 1354 psig, At total depth (TVD) 4055' 11760 psig Setting Depth Top Bottom MD TVD MD TVD Surface Surface 112' 112' Surface Surface 2713' 2582' Surface Surface 5043' 4064' 4813' 4000' 8219' 3897' 11. Type Bond (See 20 AAC 25.025) Number 2S 100302630-277 12. Distance to nearest property line 13. Distance to nearest well ADL 025637,1092' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 733' MD Maximum Hole Angle 18. CaSing;;~gram Specifications Hole CasinQ WeiQht Grade Cou,plina 42" 20" 92# H-40 Weld 13-1/2" 10-3/4" 45.5# L-80 BTC 9-7/8" 7-5/8" 29.7# L-80 BTC 6-1/8" ~" 12.7# L-80 BTC .su LenQth 112' 2713' 5043' 3406' Quantity of Cement (include staQe data) 260 sx Arctic Set (Approx.) 569 sx PF 'L', 377 sx Class 'G' 456 sx Class 'G' Uncemented Slotted Liner ~(..~ ,>,,~ t'-~ 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Structural Conductor Surface Intermediate Production Liner Length Size Cemented MD TVD RECEIVED true vertical MAR 1 0 2003 ð\iaIœ Oil & Gas Cons" COOitnIfIloo AooIioI1Vl Perforation depth: measured 181 Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch 181 Drilling Program 181 Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 MC 25.050 Requirements Contact Engineer Name/Number: Steve Campbell, 564-4401 Prepared By NamelNumber. Sandra Stewman, 564-4750 21. I hereby certify that ~~~~oing is tru1 and correct to the best of my know~ge. _" / Signed Pat Archey T ~ (L c./:" I.- ' Trtle S,. /-:>r I') )::::-,-v'0Z- Date 3 I 'ob/OS . 7 C~~ion Use OiIly Permit Number -7'\2n API Num~ I / -> 0 APpr¡al Date See cover letter .2ZJ3 -<...L..J"{\ 50- 02.t-¡ - 2-3/ f-f .L-- - 0 J I' '2..--- 17) for other reauirements Conditions of Approval: Samples Required 0 Yes rB1 No Mud Log Required 0 Yes !1 No Hydrogen Sulfide Measures 0 Yes 121 No Directional Survey Required 3 Yes 0 No Required Working Pressure for BOPE D2K D3K D4K P(5K D10K D15K 0 3.5K psi for CTU Other: ~5 aa ,,~. \ ~~ ~--\-~<5\- V le5S~'f'.( ~ Þ by order of Approved By "~ ~ ~-Z"'~L---1 Commissioner the commission Form 10-401 Rev. 12-01-85 20. Attachments Date J 112~/ø-\ Submit ~ ~rip1¡cate ) I Well Name: I MPS-24 Drill and Complete Plan Summary M. ) Point MPS-24 Well Permit I Type of Well (service / producer / injector): 1 Single Lateral Producer "NB" Surface Location: 19901 FNL, (32891 FSL), 261' FEL, (50121 FWL), SEC. 12, T12N,R1 OE E=565743.57 N=5999955.67 2180' FNL, (30991 FSL), 2152' FEL, (31271 FWL), SEC. 12,T12N, R10E E=563860.67 N=5999749.77 Z=4043' TVD/RKB 41871 FNL, (10921 FSL), 4628' FEL, (651' FWL), SEC. 12, T12N,R10E E=561402.00 N=5997722.00 Z=3897' TVD Target Location: TOP "NB" Target Location: BHL "NB" Well TD I AFE Number: 1 I Estimated Start Date: I April 3, 2003 I MD: 18219 I I TVD: 13897 I I RiQ: 1 Doyon 14 I OperatinQ days to complete: 113 I Max Inc: 195 1 I KOP: 1733 I I KBE:172 Well Design (conventional, slim hole, etc.): Conventional Grass Roots Lateral Producer I Objective: I Schrader NB Sand Mud Program: 13-1/2" Surface Hole Mud Properties: Density (ppg) Funnel visc YP HTHP 8.6 - 9.0 75 -150 25 - 60 N/A Spud - LSND Freshwater Mud pH API Filtrate LG Solids 8.5 - 9.5 < 8 < 6.5 9-7/8" Intermediate Hole Mud Properties: Density (ppg) Funnel visc YP HTHP 9.0 - 9,3 75 -150 25 - 60 N/A LSND Freshwater Mud pH API Filtrate LG Solids 9.0 - 9.5 < 8 < 6.5 6.125-in Production Hole Mud Properties: KCL-CaC03 Flo-Pro Density (ppg) Funnel visc YP HTHP pH API Filtrate LG Solids 8.6 - 9.3 40 - 55 22 - 27 <10 8.0 - 8.5 4 - 6 < 12 LCM Restrictions: No Organic LCM products in the Schrader Bluff formation Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R. Cement Program: ) M ) Point MPS-24 Well Permit " casini Size 110-3/4" 45.5-lb/ft L-80 BTC Surface Casing Basis 250% excess over gauge hole in permafrost interval 40% excess over gauge hole below permafrost Total Cement Volume: 453-bbl Wash 50-bbl water Spacer Lead Tail Temp 50-bbl Viscosified Spacer (Alpha) weighted to 10.5-lb/gal 569-sx 10.7 Ib/gal Class L - 4.15 cuft/sx (cement to surface) 377-sx 15.8 Ib/gal Prem G - 1.15 cuft/sx (top of tail at 1 BHST ::::: 80°F from SOR, BHCT 85°F estimated by Halliburton Casinç Size 17-5/8 29.7-lb/ft L-80 BTC Intermediate Casing Basis 40% excess over gauge hole. Tail 500-ft MD above top of N-sand. Total Cement Volume: 35-bbl Wash 50-bbl water 50-bbl Viscosified to 10.50 456-sx 15.8 Ib/gal Prem G - 1.15 cuft/sx (top of tail at 3296' MD) 500' above the top of the UQnu-sand BHST ::::: 80°F from SOR, BHCT 85°F estimated by Halliburton Tail Temp Evaluation Program: 13-1/2" Section Open Hole: MWD/GR/IFR/CASANDRA Gyro as required Cased Hole: N/A 9-7/8" Section Open Hole: MWD/GR/RES IFR/CASANDRA Cased Hole: N/A 6-1/8"Section Open Hole: MWD/GR/RES/ABI/IFR/CASANDRA 2 ) Formation Markers: Formation Tops Base Permafrost Top Ugnu NA NB NC TO MOrkb (ft) 1856 3976 4808 4898 4999 8219 TVDrkb (ft) 1822 3482 4012 4034 4055 3897 CasinglTubing Program: Pore Pressure (psi) 791 1511 1742 1751 1760 1692 M.. )Point MPS-24 Well Permit Estimated EMW (Ib/gal)* 8.35 8.35 8.35 8.35 8.35 8.35 Hole Csg/ WtlFt Grade Conn Length Top Bottom Size Tbg O.D. M D / TVDrkb MD / TVDrkb 42-in 20-in* 92# H-40 Weld 112' 0 112-ft / 112-ft 13-1 /2" 1 0-3/4" 45.5# L-80 BTC 2713' 0 2713' / 2582' 9-7/8" 7-5/8" 29.7# L-80 BTC 5043 0 5043' /4064' 6-1/8" 4-1/2" 12.7# L-80 BTC 3406' 4813'/4000' 8219'/ 3897' NB *The 20" casing is insulated Recommended Bit Program: BHA Hole Size Depth (M D) Bit Type Nozzle/Flow rate 1 1 3-1 /2" 0-2713 Mill tooth 3-1 5 & 1 -1 0 2 9-7/8" 2713 - 5043' Mill tooth 3-15 & 1 -1 0 3 6-1 /8" 5043' - TO Secu rity 3-12 FM2643 3 ) M )Point MPS-24 Well Permit Well Control: Surface Interval · The surface hole will be drilled with a diverter. Intermediate and Production Intervals · Maximum anticipated BHP: · Maximum surface pressure: · Planned BOP test pressure: 1,760-psi @ 4,055-ft TVDss - Top of NC-sand 1,354-psi @ surface (Based on BHP and a full column of gas from TD @ 0.1-psi/ft) Diverter will be function tested. BOPs: Test annular 250-psi low and 2,500-psi high, and rams to 250-psi low and 3,500-psi high. An FIT to 11.5-lb/gal will be made on the 7-5/8" casing shoe. 25.5-bbl with 10.0-lb/gal mud and FIT of 11.4-lb/gal @ 10-3/4" casing shoe. 9.2-lb/gal NaCI / 6.8-lb/gal Diesel · Integrity test: · Kick tolerance: · Planned completion fluid: Drilling Hazards & Contingencies: Hydrates · Hydrates have not been seen on S pad, but has been encountered in the surface holes on other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/- 1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for the possibility of shallow gas and/or hydrates. Use recommended practices for drilling hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well Program and Recommended Practices for specific information. · Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have experienced stuck pipe from this situation. Lost Circulation · We do not expect losses while drilling this well. · Offset wells encountered losses while running and cementing casing and only one well had losses while running a hole opener. Below is a list of the wells and the lost circulating problems associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures · It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the Schrader Bluff formation will be drilled with 9.1 ppg mud. 4 ) M ') Point MPS-24 Well Permit Pad Data Sheet · Please Read the S-Pad Data Sheet thoroughly. Breathing · N/A Hydrocarbons · Hydrocarbons will be encountered in the NA through the Schrader Bluff. Faults · NA Hydrogen Sulfide · MPS Pad is not designated as an H2S Pad. Anti-collision Issues · MPS-24 has no anti-collision issues. 5 } M ) Point MPS-24 Well Permit DRILL & COMPLETION PROCEDURE Pre-Rig Operations 1. Install 20-in insulated conductor. Procedure 1. MIRU. NU diverter on 20-in conductor and function test. 2. Drill 13-1 /2" surface hole as per directional plan. 3. Case and cement 10-3/4" surface casing. 4. NO diverter, NU BOPE and test. 5. Perform FIT. 6. Drill 9-7/8" hole to base of the NB-sand as per directional plan. -(:/d hpk . 7. Case and cement 7-5/8" intermediate casing. Freeze protect 7-5/8" x 10-3/4" annulus 8. Mill window in casing at the top of the NB sand 9. Perform FIT. 10. Drill 6-1/8" NB-sand lateral as per directional plan. 11. Run 5" uncemented sand screens hang off 100-ft inside 7-5/8" casing. 12. Displace drilling mud to brine. 13. Run 4-1/2" jet pump completion as per schematic. 14. Land tubing hanger and test. 15. Set BPV. 16. NO BOP. 17. Install and test tree. 18. Pull BPV. 19. Test 7-5/8" x 4-1/2" annulus. 20. Freeze protect thru GLM. 21. Install BPV and secure well. 22. RD/MO. 6 P~~OPOSI::LJ GOMPLI:: liON · M~'\.-?4 ~~D 20" 92 Ibltt, H-40 Welded / Insulated Diesel Freeze protect to 750' MD )"REE: Cameron 4-1/16" 5M ,WELLHEÞ..D: FMC Gen 6 11 ", 5M Tubing Head: 11" x 4-1/2", FMC Tubing Hanger 1121 10-3/4" 45.5#, L-80, BTC-M Casing Orift: 9.875 Casing ID: 9.950 Coupling 00: 11.75" Burst: 5,21 0 psi Collapse: 2,480 psi 9.8 KCI with corrosion inhibitor as packer fluid / Jet Pump Installed in - Sliding Sleeve Post rig! 7-5/8" 29.7#, L-80, BTC-M Casing Drift: 6.75 Casing 10: 6.875 Coupling 00: 11.75" Burst: 6,890 psi Collapse: 4,790 psi Window in 7-5/8" casing @ 4913' MO Well Inclination @ Window = 78 Degrees 7.625" Casing Shoe @ 5,043' MD; 4064' TVD .... Well Inclination @ Shoe = 78 Degrees DATE COMMENTS REV. BY ~ . - ) KB. ELEV =72.0' Cellar Box ELEV = 38.3' ... 42" Hole 4-1/2" x 1" Gas Lift Mandrel @ 2,200' MD; 2,068' TVD, 13-1/2" hole 4-1/2",12.6 Iblft, L-80, IBT-M Coupling OD: 5.2" Drift/ID: 3.833" Burst: 8,430, 80% 6,744 psi Collapse: 7,500, 80%=6,000 psi .... 10-3/4"@ 2,713' MD, 2,585' TVD/RKB 'BIW 1- Wire Phoenix Pressure Gauge (3.850" 10, W/BIW 1- wire down to lower sensor) Phoenix Pressure Gauge (2.840" 10) 7-5/8" x 4-1/2" Premier Packer I Set @ 4,813' MD 3-1/2" HES 'XN' nipple 2.750" 10 No Go W/RHC ball & rod Wireline Entry Guide '- ;I/J S-1/8"¢ateral TO 18219' MD/3897' TVDI - - - - - - NB Horizontal 6-1/8" hole ------ 5" Sand Screen Liner WlBaker HR-ZXP liner hanger ..... 9-7/8" Hole t: /01- 44 Milne Point Unit WF : MPS-?4 API NO: • bp COMPANY DETAILS REFERENCE INFORMATION SURVEY PROGRAM Plan: MPS -24pb1 wp0l (Plan MPS- 24/Plan MPS -24PB I) CBP Amoco Co-ordinate (N/E) Ref ce: Well Centre: Plan MPS -24, True North Depth Fm Depth To Survey/Plan Tool Created By: Ken Allen Date- 2/20/2003 Var (DVO) Ref e. S -Pad Dev 72.00 Calculation Method: Minimum Curvature Section (VS) Reference Slot - (0.00E1.0.00E) 33.00 1061.00 Planned: MPS -24pbl wp01 V16 CB- GYRO -SS Error System: ISCWSA Measured Depth Reference. S-Pad Dev 72.00 1061.00 5043.00 Planned: MPS -24pbI wp01 V16 MWD +IFR +MS Checked: Date: Scan Method: Tray Cylinder North Calculation Method Minimum Curvature Error Surface: Elliptical + Casing Reviewed: Date: Wain , _ Method: Rules Based CASING DETAILS WELL DETAILS • Name ON / -S +P/ -W Northing Eastmg latitude Longitude Slot No. TVD MD Name Size Plan MPS-24 -16.99 - 601.66 5999955.67 565743.57 70 149 N/A 1 2582.00 2713.07 10 3/4" 10.750 TARGET DETAILS 2 4064.03 5043.00 7 5/8" 7.625 pp Nave TVD +N / -S +E -W Northing Easnng Shape 0-11 I Y!J-dT FORMATION TOP DETAILS MPS-24 TI.1 4037.00 -200.03 - 1893.58 5999739.00 563852.00 Point MPS -24 Poly 4042.00 283.18 - 1796.32 6000223.00 563945.00 Polygon No. TVDPath MDPath Formation 1 1822.00 1856.37 BPRF SECTION DETAILS 2 3482.00 3796.92 TUZC Sec MD Inc Azi TVD +N / -S +E/ -W DLeg TFace VSec Target - 3 4012.00 4808.11 SBF2 -NA - 4 4031.00 4885.22 NAMF 1 33.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 - + Start Dir 1.5 /100' : 600' MD, 600TVD 5 4034.00 4898.85 SBFI -NB 6 4040.00 4927.43 SBFI -NBR 2 600.00 0.00 0.00 600.00 0.00 0.00 0.00 0.00 0.00 7 4055.00 4999.57 SBE4 -NC 3 733.33 2.00 300.00 733.31 1.16 -2.02 1.50 300.00 1.82 Smrt Dir2 .5/t00':733.33'MD,733.31TVD 4 1213.33 14.00 300.00 1207.77 34.50 -59.76 2.50 0.00 53.93 700 - / 5 1480.00 18.00 300.00 1464.05 71.25 - 123.41 1.50 0.00 111.36 6 1938.38 18.00 300.00 1900.00 142.07 - 246.08 0.00 0.00 222.06 6° All TVD depths are DDVvDD��++ 8 3122.98 30.74 293.31 2934.30 374.13 - 769.89 0.00 -15.34 0.00 705.28 ssTVD plus 72 for .R.KB. .. 10 5043.00 78.00 219.20 4064.03 - 298.57 - 1973.95 0.00 -82.49 0.00 1996.40 MPS -24 00 2" Start Dir 1.5/100' : 1213.33' MD, 1207.77TVD End Dir :1480' MD, 1464.05' TVD -.� - - -1 1401 _ -- - i .. �.._. 9 r _ , , i _ .� 0011% / 0/%4 \ 10.- 0 1 Start Dir 4/100' :1938.38 MD, 1900 "FVD / I ' ;I ■ Dir : 2 26 .89' 2195.94'TVD 00 ' . . End 3 // ' \ \ \ \ \ � o / / 1 \ \ \ \\ \ \ . pppOropr■44R4Ek■pa44 0 Egoodit // / m , q\\ \ 4 i► \ o 2800 Start Dir 4/100': 3122.98' MD,2934.3TVD , "j o 44 Alb"- 4..... /11 , 00 0 0 1 3500 TlY.0 r /���� �. ` i r , 4- as �1 " End Dir :4913'MD,403TTVD� 1i D jT • •.. s � N ' B' 1 -NH 2 5000 7 5/8" _I' � �o / lie" ` • Total Depth : 5043' MD, 4064.03' TV MPS -24pb1 wp01 4• •. `/ /,>Z1 4100 . i `�... o p I l l l l i l t t t l l l l l l l O X50 0 700 1400 2100 2800 4 '17e0 Vertical Section at 261.40° [700ft/in] b p COMPANY DETAILS REFERENCE INFORMATION SURVEY PROGRAM Plan: MPS-2401 wp01 (Plan MPS -24 /Plan MPS- 24PB1) 047 RP Amoco Co- ordinate (19/E) Reference) Well Centre: Plan MPS-24. True North Vertical (TVD) Reference) S -Pad Dev 72.00 Depth Fm Depth To Survey/Plan 7'001 Created By: Ken Allen Date: 2/20/2003 Calculation Method: Mudnrum Curvature Section (VS) Reference: Slot - (0.00N.0,00E) 33.00 1061.00 Planned: MPS-24p131 wIAl V 16 ('B- GYRO -SS Checked: Date: Error System: ISCWSA Measured Depth Reference: S -Pad Dev 7200 3061 00 5043 011 Planned: MPS -24pbI wp0l V 16 MWPHFR *MS t Scan Method: 1 my (}inder North Calculation Method: Minimum Curvature Error Surface: Elliptical r Casing Reviewed: Date: of Wammg Method: Rules Rased - _ WELL DETAILS 40`1 All TVD depths are Name ON/-S +F/ -W Northing Easting Latitude Longitude Slot 1 Plan MPS-24 -1699 -601.66 5999955.67 565743.57 70 149 N/A • / °� 1``11 1 1 ` ss TVD plus / L / for RKBE. TARGET DETAILS / /// 1 1``11 ` 1 ` Name TVD rN / -S +F/.W Nonl.ng Fasting Shape MPS-24 PI Point 4042.00 -200.03 - 1796.32 5999739.00 563945.00 Polyt / MPS -24 4 Poly y 4042.00 283.18 - 1796.32 6000223.00 563945.00 Polygon 0 100000010%1%4%%1%tRk �/��`111`` SECTION DETAILS S ec 1 MD Inc Azi 33.00 0.00 0.00 TVD +N / -S +E/-W DLeg TFace 33.00 0.00 0.00 0.00 0.00 VSec Target ///1,' 0.00 A / �/`� ® ®`11�ja` 2 600.00 0.00 0.00 600.00 0.00 0.00 0.00 0.00 0.00 3 733.33 2.00 300.00 733.31 1.16 -2.02 1.50 300.00 1.82 1 , 4 1213.33 14.00 300.00 1207.77 34.50 -59.76 2.50 0.00 53.93 0 0OOPPO ..`14`,�,,1` 5 1480.00 18.00 300.00 1464.05 71.25 123.41 1.50 0.00 111.36 042150' 0 400 •.•`14;;1`` 6 1938.38 18.00 300.00 1900.00 142.07 -246.08 0.00 0.00 222.06 Alb... . • 1 ` 7 2263.89 30.74 293.31 2195.94 200.38 -366.56 4.00 -15.34 332.47 �/- 8 3122.98 30.74 293.31 2934.30 374.13 -769.89 0.00 0.00 705.28 9 4913.00 78.00 219.20 4037.00 - 200.03 - 1893.58 4.00 -82.49 1902.20 MPS -24 T ,,° =_ ar--� �..`` 10 5043.00 78.00 219.20 4064.03 - 298.57 - 1973.95 0.00 0.00 1996.40 �� ® �4- � 1 CASING DETAILS FORMATION TOP DETAILS ., • FAVIt 1 I I P ill er4 No. TVD MD Name Size No. TVDPath MDPath Formation ,•�....•• . #° 1 2582.00 2713.07 10 3/4" 10.750 1 1822.00 1856.37 BPRF 2 4064.03 5043.00 7 5/8" 7.625 2 3482.00 3796.92 TUZC . 3 4012.00 4808.11 SBF2 -NA N NAME' 4031.00 4885.22 NAM S • 5 4034.00 4898.85 SBFI -NB ,� •.•. 6 4040.00 4927.43 SBFI -NBR ,� . 7 4055.00 4999.57 SBE4 -NC 601 t o 55 ta't Dir 4/ O(' : 31 2.98' MD, 2934.3'TVD 3Cn( 300 3500 P Poly lu 1/4 �. F. 50 Et d in : 22'53.89' MD, 2195.94' TVD c �t trt"Di`4'1t0' 1938.38' MD, 1900'TVD o .00 Eqd 7 :1430 MD, 1464.05' TVD LC '1tlr ' ..5 /100 :1213.33' MD, 1207.77'TVD g ° 150I0 St Dir 2.5/100' : 733.33' MD, 733,31'TVD 0 I Ii 000 Start Dir 1.5 /100' :600' MD, 600'TVD = i0: 11 tt M " 'T 1 r,8 30� 4N-74 0 , . . I. al Dc pt . .� !U, 41. 4 I I I - 1 1 1 1 1 1 1 1 1 1 I I I I I -2100 -1800 -1500 -1200 -900 -600 -300 0 300 1 West( -) /East( +) [300ft/in] ') BP ) KW A Planning Report MAP Company: · Field:' Site: . Well: , Wellpath: BP Amoco Milne Pbint M PfS.Pád··, Plan MPS,;24 Plan MPS·24PB1 Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Site: M pt S Pad Site Position: From: Map Position Uncertainty: Ground Level: 5999978.00 ft 566345.00 ft Northing: Easting: 0.00 ft 0.00 ft Well: Plan MPS-24 Well Position: +N/-S -16.99 ft Northing: 5999955.67 ft +E/-W -601.66 ft Easting: 565743.57 ft Position Uncertainty: 0.00 ft Wellpath: Plan MPS-24PB1 Current Datum: Magnetic Data: Field Strength: Vertical Section: S-Pad Dev 6/29/2001 57481 nT Depth From (TVD) ft 0.00 +N/-S ft 0.00 Height 72.00 ft Plan: MPS-24pb1 wp01 Principal: Yes Casing Points Date: 2/20/2003 Time: 16:57:58, Pag~: Co-ordinate(NE) Referenc.e: Well: plan MPS~24j True North Ver~ica){TVp) ]leference: S-Pad Dev 72:0 Section (VS)Reference: Well (0.OON;O,OOE,261.40Azi) Survey CaÏëulationMethod: Mil1imUrnCurväture·' , .Db: Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2002 Latitude: Longitude: North Reference: Grid Convergence: 70 24 37.329 N 149 27 35.171 W True 0.51 deg Slot Name: Latitude: Longitude: 70 24 37.161 N 149 27 52.806 W Drilled From: Tie-on Depth: Above System .Datum: Declination: Mag Dip Angle: +E/- W ft 0.00 Well Ref. Point 0.00 ft Mean Sea Level 26.21 deg 80.79 deg Direction deg 261.40 2/11/2003 16 From Well Ref. Point Date Composed: Version: Tied-to: MD TVD Diameter Hole Size Name ft ft in in 2713.07 2582.00 10.750 13.500 10 3/4" 5043.00 4064.03 7.625 9.875 75/8" Formations MD TVD Formations Lithology Dip Angle Dip Direction ft ft deg deg 1856.37 1822.00 BPRF 0.00 0.00 3796.92 3482.00 TUZC 0.00 0.00 4808.11 4012.00 SBF2-NA 0.00 0.00 4885.22 4031.00 NAMF 0.00 0.00 4898.85 4034.00 SBF1-NB 0.00 0.00 4927.43 4040.00 SBF1-NBR 0.00 0.00 4999.57 4055.00 SBE4-NC 0.00 0.00 Targets Map Map <-- Latitude --> <-- Longitude --> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft MPS-24 T1.1 4037.00 -200.03 -1893.58 5999739.00 563852.00 70 24 35.192 N 149 28 48.306 W -Plan hit target MPS-24 Poly 4042.00 283.18 -1796.32 6000223.00 563945.00 70 24 39.944 N 149 28 45.459 W -Polygon 1 4042.00 283.18 -1796.32 6000223.00 563945.00 70 24 39.944 N 149 28 45.459 W -Polygon 2 4042.00 -1419.04 -3160.49 5998509.00 562596.00 70 24 23.199 N 149 29 25.424 W -Polygon 3 4042.00 -1821.12 -4066.15 5998099.00 561694.00 70 24 19.240 N 149 29 51.958 W -Polygon 4 4042.00 -2679.13 -4759.79 5997235.00 561008.00 70 24 10.798 N 149 30 12.268 W -Polygon 5 4042.00 -2208.43 -3242.44 5997718.99 562521.00 70 24 15.435 N 149 29 27.815 W -Polygon 6 4042.00 -335.58 -1719.76 5999605.00 564027.00 70 24 33.859 N 149 28 43.211 W ') BP ') KW A Planning Report MAP Company: BP Amoco Date: 2/20/2003 · Time: · .'16:57;58 Pàge: Field: . MilrïePoint CO"f.)rdinat~(NË) R~(erence: . · Well:; Plan MPS-24, True North Site: ' MPì$Pad V'ertical (TYJ»,~~ferenc~: ,S,.Pad Dev72.Ö .......'., , ,Well: PlånMPS..24 ' Se~~on(VS) Rëference: . , \tVeU(0~OQN,0.0()~,261 ,40Azi) Wellpath: Plan MPS~24PB1 Sur.veyCalcuhitioni\1éthod: MinimÜmCurvature ' . Db: Targets Map .' F;ästing ft ft 5999720.64 563837.30 70 24 35.012 N 149 28 48.742 W Plan Section Information MD ,Incl ,Azilri TVO +N/..;S +E/..;W 'OLS ,. Build . Turn·'" TFO ,.;ft '·dêg deg ft 'ft ft dëg/100ft deg/100ft dëg/1 QOft deg 33.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 0.00 600.00 0.00 0.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00 733.33 2.00 300.00 733.31 1.16 -2.02 1.50 1.50 0.00 300.00 1213.33 14.00 300.00 1207.77 34.50 -59.76 2.50 2.50 0.00 0.00 1480.00 18.00 300.00 1464.05 71.25 -123.41 1.50 1.50 0.00 0.00 1938.38 18.00 300.00 1900.00 142.07 -246.08 0.00 0.00 0.00 0.00 2263.89 30.74 293.31 2195.94 200.38 -366.56 4.00 3.91 -2.06 -15.34 3122.98 30.74 293.31 2934.30 374.13 -769.89 0.00 0.00 0.00 0.00 4913.00 78.00 219.20 4037.00 -200.03 -1893.58 4.00 2.64 -4.14 -82.49 MPS-24 T1.1 5043.00 78.00 219.20 4064.03 -298.57 -1973.95 0.00 0.00 0.00 0.00 Survey Mp Ind ',' Azim TYD Sys TVO MapN MäpE VS OLS TFO ' Tool/Comment. ft deQ deg ft ft ft ft 'ft ' d ëg/10 Oft , deg 33.00 0.00 0.00 33.00 -39.00 5999955.67 565743.57 0.00 0.00 0.00 CB-GYRO-SS 100.00 0.00 0.00 100.00 28.00 5999955.67 565743.57 0.00 0.00 0.00 CB-GYRO-SS 200.00 0.00 0.00 200.00 128.00 5999955.67 565743.57 0.00 0.00 0.00 CB-GYRO-SS 300.00 . 0.00 0.00 300.00 228.00 5999955.67 565743.57 0.00 0.00 0.00 CB-GYRO-SS 400.00 0.00 0.00 400.00 328.00 5999955.67 565743.57 0.00 0.00 0.00 CB-GYRO-SS 500.00 0.00 0.00 500.00 428.00 5999955.67 565743.57 0.00 0.00 0.00 CB-GYRO-SS 600.00 0.00 0.00 600.00 528.00 5999955.67 565743.57 0.00 0.00 0.00 CB-GYRO-SS 700.00 1.50 300.00 699.99 627.99 5999956.31 565742.43 1.02 1.50 0.00 CB-GYRO-SS 733.33 2.00 300.00 733.31 661.31 5999956.82 565741.54 1.82 1.50 0.00 CB-GYRO-SS 800.00 3.67 300.00 799.89 727.89 5999958.44 565738.68 4.39 2.50 0.00 CB-GYRO-SS 900.00 6.17 300.00 899.51 827.51 5999962.66 565731.22 11.09 2.50 0.00 CB-GYRO-SS 1000.00 8.67 300.00 998.67 926.67 5999969.01 565719.99 21.18 2.50 0.00 CB-GYRO-SS 1100.00 11.17 300.00 1097.17 1025.17 5999977.49 565705.00 34.64 2.50 0.00 MWD+IFR+MS 1200.00 13.67 300.00 1194.82 1122.82 5999988.07 565686.29 51.44 2.50 0.00 MWD+IFR+MS 1213.33 14.00 300.00 1207.77 1135.77 5999989.64 565683.51 53.93 2.50 0.00 MWD+IFR+MS 1300.00 15.30 300.00 1291.61 1219.61 6000000.43 565664.44 71.06 1.50 0.00 MWD+IFR+MS 1400.00 16.80 300.00 1387.71 1315.71 6000014.04 565640.37 92.67 1.50 0.00 MWD+IFR+MS 1480.00 18.00 300.00 1464.05 1392.05 6000025.82 565619.55 111.36 1.50 0.00 MWD+IFR+MS 1500.00 18.00 300.00 1483.07 1411.07 6000028.87 565614.18 116.19 0.00 0.00 MWD+IFR+MS 1600.00 18.00 300.00 1578.18 1506.18 6000044.08 565587.28 140.34 0.00 0.00 MWD+IFR+MS 1700.00 18.00 300.00 1673.28 1601.28 6000059.29 565560.39 164.49 0.00 0.00 MWD+IFR+MS 1800.00 18.00 300.00 1768.39 1696.39 6000074.50 565533.49 188.64 0.00 0.00 MWD+IFR+MS 1856.37 18.00 300.00 1822.00 1750.00 6000083.08 565518.33 202.26 0.00 0.00 BPRF 1900.00 18.00 300.00 1863.49 1791.49 6000089.72 565506.60 212.79 0.00 0.00 MWD+IFR+MS 1938.38 18.00 300.00 1900.00 1828.00 6000095.56 565496.28 222.06 0.00 0.00 MWD+IFR+MS 2000.00 20.39 298.13 1958.19 1886.19 6000105.22 565478.48 238.11 4.00 344.66 MWD+IFR+MS 2100.00 24.29 295.85 2050.67 1978.67 6000122.11 565444.45 269.04 4.00 346.43 MWD+IFR+MS 2200.00 28.22 294.17 2140.33 2068.33 6000140.41 565404.19 305.90 4.00 348.54 MWD+IFR+MS 2263.89 30.74 293.31 2195.94 2123.94 6000152.80 565375.30 332.47 4.00 350.05 MWD+IFR+MS 2300.00 30.74 293.31 2226.98 2154.98 6000159.96 565358.28 348.14 0.00 0.00 MWD+IFR+MS 2400.00 30.74 293.31 2312.92 2240.92 6000179.76 565311.16 391.54 0.00 0.00 MWD+IFR+MS 2500.00 30.74 293.31 2398.87 2326.87 6000199.57 565264.04 434.93 0.00 0.00 MWD+IFR+MS 2600.00 30.74 293.31 2484.82 2412.82 6000219.38 565216.92 478.33 0.00 0.00 MWD+IFR+MS 2700.00 30.74 293.31 2570.76 2498.76 6000239.19 565169.80 521.72 0.00 0.00 MWD+IFR+MS 2800.00 30.74 293.31 2656.71 2584.71 6000259.00 565122.68 565.12 0.00 0.00 MWD+IFR+MS ) BP ) KW A Planning Report MAP Compåny: ,BPAmÒco Date:. ... ·2/20/2003· Time: ... 16:57:58 Page: Field: . Mílne Point (;()"9rdinate(NE) .~eference: VVell:Plan MPS~24;Jrue North· Site:< M Pt gPad Vertical(fVO)Jleference: .. . S.,.PadDev.72.0.. . .. . .. ·Well: Plan MPS-24 Seëtio~ (VS)lleference.: ..... . Wen (0.00NI0~00E,2ß1 é4OAzi) WeUpath: PI~nMPS~24PB1 Survey Calcl1latiØril\1etbod: Minimum Curvature·· Db: Survey MD Incl Azlm tvo MapE VS DLS· TFO ft deg .·deg ft ft· ff deg/100ft 2900.00 30.74 293.31 2742.66 2670.66 6000278.80 565075.56 608.51 0.00 0.00 MWD+IFR+MS 3000.00 30.74 293.31 2828.60 2756.60 6000298.61 565028.44 651.91 0.00 0.00 MWD+IFR+MS 3100.00 30.74 293.31 2914.55 2842.55 6000318.42 564981.32 695.31 0.00 0.00 MWD+IFR+MS 3122.98 30.74 293.31 2934.30 2862.30 6000322.97 564970.49 705.28 0.00 0.00 MWD+IFR+MS 3200.00 31.28 287.41 3000.33 2928.33 6000336.42 564933.21 739.97 4.00 277.51 MWD+IFR+MS 3300.00 32.36 280.11 3085.33 3013.33 6000348.44 564881.96 788.67 4.00 282.56 MWD+IFR+MS 3400.00 33.84 273.30 3169.13 3097.13 6000354.26 564827.75 841.28 4.00 288.77 MWD+IFR+MS 3500.00 35.66 267.04 3251.32 3179.32 6000353.86 564770.82 897.56 4.00 294.48 MWD+IFR+MS 3600.00 37.78 261.36 3331.49 3259.49 6000347.23 564711.47 957.22 4.00 299.62 MWD+IFR+MS 3700.00 40.14 256.23 3409.27 3337.27 6000334.41 564649.98 1019.97 4.00 304.17 MWD+IFR+MS 3796.92 42.62 251.72 3482.00 3410.00 6000316.13 564588.62 1083.46 4.00 308.17 TUZC 3800.00 42.71 251.59 3484.27 3412.27 6000315.46 564586.64 1085.52 4.00 311.55 MWD+IFR+MS 3900.00 45.44 247.39 3556.12 3484.12 6000290.47 564521.77 1153.53 4.00 311.65 MWD+IFR+MS 4000.00 48.32 243.58 3624.47 3552.47 6000259.57 564455.68 1223.68 4.00 314.66 MWD+IFR+MS 4100.00 51.31 240.11 3689.00 3617.00 6000222.90 564388.70 1295.63 4.00 317.27 MWD+IFR+MS 4200.00 54.40 236.91 3749.39 3677.39 6000180.65 564321.15 1369.02 4.00 319.51 MWD+IFR+MS 4300.00 57.56 233.96 3805.33 3733.33 6000133.01 564253.36 1443.50 4.00 321.44 MWD+IFR+MS 4400.00 60.79 231.21 3856.57 3784.57 6000080.23 564185.66 1518.71 4.00 323.09 MWD+IFR+MS 4500.00 64.07 228.63 3902.85 3830.85 6000022.55 564118.39 1594.27 4.00 324.50 MWD+IFR+MS 4600.00 67.40 226.19 3943.94 3871.94 5999960.27 564051.85 1669.83 4.00 325.70 MWD+IFR+MS 4700.00 70.76 223.86 3979.65 3907.65 5999893.68 563986.40 1745.01 4.00 326.70 MWD+IFR+MS 4800.00 74.15 221.63 4009.80 3937.80 5999823.11 563922.33 1819.44 4.00 327.53 MWD+IFR+MS 4808.11 74.42 221.46 4012.00 3940.00 5999817.22 563917.21 1825.43 4.00 328.21 SBF2-NA 4885.22 77.05 219.79 4031.00 3959.00 5999760.08 563869.06 1882.02 4.00 328.25 NAMF 4898.85 77.52 219.50 4034.00 3962.00 5999749.77 563860.67 1891.93 4.00 328.67 SBF1-NB 4900.00 77.56 219.48 4034.25 3962.25 5999748.89 563859.97 1892.77 4.00 328.73 MWD+IFR+MS 4913.00 78.00 219.20 4037.00 3965.00 5999739.00 563852.00 1902.20 4.00 328.73 MPS-24 T1.1 4927.43 78.00 219.20 4040.00 3968.00 5999727.98 563843.18 1912.66 0.00 0.00 SBF1-NBR 4937.05 78.00 219.20 4042.00 3970.00 5999720.64 563837.30 1919.63 0.00 0.00 MPS-24 Poly 4999.57 78.00 219.20 4055.00 3983.00 5999672.91 563799.06 1964.94 0.00 0.00 SBE4-NC 5000.00 78.00 219.20 4055.09 3983.09 5999672.59 563798.80 1965.25 0.00 0.00 MWD+IFR+MS 5043.00 78.00 219.20 4064.03 3992.03 5999639.76 563772.51 1996.40 0.00 0.00 MWD+IFR+MS bp COMPANY DETAILS REFERENCE INFORMATION SURVEY PROGRAM Plan: MPS -24 wp07 (Plan MPS- 24/Plan MPS -24) 0 HP Amoco Co-ordinate (N/F.) Reference Well Centre: Plan MPS-24, Tea North Depth Fm Depth To Survey/Nan Created By: Ken Allen Date: 2/24 /2003 Vertical (TVD) Reference: Slot - (0. Dm 72.00 Section (VS) Ref Calculation Method: I Curvature erence: Slot - 0)N.0.00E) 4913.OD 8219.78 Planned: MPS-24 wp07 V4 M1ltl'I ) -IIR •M1I� Checked. Date: Error System: Tra WSA Measured Depth Reference: S -Pad Dm 72.00 Calculation Scan Method: Tray Cylinder NCalculation Method: Minimum Curvatrve Error Surface: Elliptical r Casing Reviewed: Date: WammS Method: Rules Based wminal WELL DETAILS /` Name +N / -S +E/ -W Northing Easlmg Latitude Longitude Slot Plan MPS-24 -16.99 - 601.66 5999955.67 565743.57 70°24'37.161N 149 °27'52.806W N/A / `11 TARGET DETAILS 1` Name TVD +N.5S 36.W North's* F.00 Poipe 011°4%41411 MPS -24 T6 3987.00 - 1755.18 31511.44 59971723.10 56260002.00 Point MPS -24 T5 3927.00 - 2055.09 - 3846.17 5997867.01 561916.00 Point MPS -24 T3.1 3982.00 - 1487.97 - 2142.06 5998442.01 562615.00 Point '`` MPS -24 Pa 402.00 - 1283.18 - 1796.32 5000223 563945.00 Polyt MPS -24 22.1 4012.00 - 648.87 - 2259.58 5999287.00 563490.00 Point ///' `11` ` 1 MPS-24 Poly y 4012.00 283.18 - 1796.32 6010223.00 563945.00 Polygon / / ' 0%k%k% `` SECTION DETAILS / / / '' I ` ` ` ` � ` Sec MD Inc Azi TVD +N / -S +E/ -W DLeg TFace VSec Target p //// / `` ` 1 4913.00 78.00 219.20 4037.00 -200.03 -1893.58 0.00 0.00 1781.31 ` /I // / / 1 1 ` 4 2 5052.84 94.78 219.20 4045.77 -307.80 - 1981.47 12.00 -0.02 1908.27 Ie 0 / / 0 1.` 1 1 1 `' ■,1 3 5374.73 94.78 219.20 4018.95 -556.40 - 2184.19 0.00 0.00 2201.11 4 5419.25 93.00 219.19 4015.93 -590.82 -2212.26 4.00 5 5494.25 93.00 219.19 4012.00 - 648.87 - 2259.58 0.00 17 0.00 2310.04 MPS -24 T2.I I* ,0 d / `0%0 6 5543.91 91.01 219.12 4010.26 - 687.35 - 2290.92 4.00 - 178.02 2 p 7 6575.68 91.01 219.12 3992.01 - 1487.69 - 2941.83 0.00 0.00 3296.59 ¢' r / / / • ` 1 , ` ` '' ` ` 8 6576.05 91.00 219.12 3992.00 - 1487.97 - 2942.06 4.00 - 175.02 3296.93 MPS -24 T3.1 / .1 r ` 9 6639.69 90.05 216.76 3991.42 - 1538.16 - 2981.18 4.00 - 111.88 3354.44 1 6759.32 90.05 216.76 3991.31 -1634.1 -352.77 0.00 0.0 341.4 / / . •.. ``` 11 6920.94 93.00 226.00 3987.00 - 1755.10 - 3159.44 6.00 72.21 3611.2 MPS -24 T4.1 4 °) /�/�_.- 111 ` ` 12 7437.12 95.33 256.97 3948.59 - 1998.02 - 3606.13 6.00 84.64 4119.42 ix , _ A. , �_� I. ` 1 13 7608.37 95.33 256.97 3932.69 - 2036.47 - 3772.24 0.00 0.00 4285.08 ` '�/= ■ �� � - � , � 14 7684.83 93.21 254.75 3927.00 - 2055.09 - 3846.17 4.00 - 133.58 4359.49 MPS -24 T5 tra 15 8219.78 93.21 254.75 3897.00 - 2195.58 - 4361.48 0.00 0.00 4882.93 MPS -24 T6 �� � y �, •. 1 CASING DETAILS - - W q r .•. No. TVD MD Name Size .. ? O •.. • • 1 3897.00 8219.77 4 " screens 4.000 4, ,Sr p • •• • ••• FORMATION TOP DETAILS •� ��•� � ��� All TVD depths are No. TVDPath MDPath Formation • ..% ssTVD plus 72' for RKBE. 1 4040.00 4928.63 SBFI -NBR 3601 Start Dir 12 /100' : 4913' MD, 4037TVD a - ! ' _ End Dir : 5052.84' MD, 4045.77' TVD a Start Dir 4/100' : 5374.73' MD, 4018.95TVD g End Dir : 5419.25' MD, 4015.93' TVD . 0 , Start Dir 4/100' : 5494.25' MD, 4012TVD Total Depth : 8219.78' MD, 3897' TVD s d I r : 554 .91' D 4110 26' s PS 2• T. MPS -24 wp07 a. mi 1• ■ ■ ■.111111•.■ ■ ■■I ■� ■ ■1111I•I••■ ■■■■■■■■ ■ ■ ■ ■ ■ ■ ■■ ■■• ■ ■ ■ ■ ■ ■ ■■ ■■■ ■ ■ ■■■iili i1111� ■�! ��� 4 "screens c. E !_UUII•U•i•II• • II•• I. 9• �I• I• I■ I■ II• II• IIIII• •II•II•II•■■II•II•II•II•II•II•© 3311M11•••rift I1I11f1•∎•11 ■ ■• ■ ■••!�I��I�■ -F ft1II•II• ■■ 1 4001 1 \S \• ■111.11■�■ ■ ■ ■ ■ ■ ■ ■ ■�I ■_ ■_ •■•••■■■■■■■■■■■■■ ��m��i∎∎. t� _C.1iii■ ■ ■ ■swiloI/ ■_ /I■_�mI■ ■■■■ i•ism_giNa imm ••∎c- .i. ...;�il•mm� iumumKmmunn � womiii 1111 riammsri, l �>•mu�tmmomFAMOSTAfal- �ommmwmu > IMO MPII.1 ■.M■■■IRIMM•■1111l HIlul•III•I■11Wa11■■■ ■ ■ ■ ■■■■I •••1111/ III• ■I■■ ■■1111■■■•■ ■LI■ ■■•■•1 ■■•MINIIII■■1111■■■ z 1•Iiiiii iii■iliiii111■ ■ ■i ■11■t ■ ■ ■• ■ ■•1lI PIII! !!! I!l MEIRRUN11AfIVA ■■rill11111AiLiiIIIMI QUakiiiiaW••0■IN•••••••■■■ ■■■ I- 1• ■ ■ ■•■■ ■ ■QI 1 EEEZET 1131IC ■ ■ ■•1111111111r■ ■1111 !11INNI1!filINNO ■MA11 % ■/,■MIN11 ■EVICELC11Ei•Eia,ZE MME ■ ■■ ■1111 ■EM■11■ 1111 I ■ 11■=■■■■■■■■■■■■■■■■■••■■■ 11iiiiiinliiiiiifliiiiifliidiki / ■■11 ■ ■ ■• ■ ■ ■ ■■li'IT!!Jl/7 i!t41R7TSCS:'7 ■ ■ ■ ■ ■■ ■ ■I• •1111 ■■I■ III•■ ■•• ■ ■ ■ ■ ■ ■■• ■■ III •■IIIIIIIIIII• ■ ■■■r.RIMAIREVE: ITIM11I Ill ••• •• ■ ■■■• ■■■■■■ ■■ ■ ■ ■•■■ =1•■■ ■111•1■■ ■■■II•■■ ■ ■ ■■■■■ ■••1111 III•■ IIIIIIIIII•■■■•■■■■■■■ I■■■■■ I■■■■■■■ II•■■■■■ I■■■■■■ ■ ■ ■ ■■ ■■■III•IIIIIIIIIIIIIIIIII• ■■1111• ■■ ••••••••• •••••••••■•••••••• •••••••••• •••••••••• •••••••••• •••••••••■•■•••• ■ •••■••••• ■ ■ ■■ III• ■■■III••IIIIIIIIIII••• ■■■ ■ ■ ■■■• 1111 ■■ 1111■■■■ ■ ■ ∎■ 1111•■■■■■■■■■■■•■■ IIIIIIIIIII •IIIIIIIIIIIIIIIIII•■ ■III•■ • 4401 ■■■■■■■■■■■■■■ IIII•■ I ■■II• ■ ∎ ■ ■ ■■ ■ ■ ■ ■ ■ ■■■ ■ ■ ■ ■ ■ ■ ■ ■■I■■ III•■■■ 11■■■ ■■11 ■ ■ ■ ■ ■ ■■■IIIIIIIIII•IIIIIII�■ ■III• ■■ IIM■■■■■ ■ ■ ■ ■■■■ ■ ■••••• ••• ■■■■■■■■■\■■■■■■■•■ ■ ■ ■ ■•1■■■•■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■■•■∎••■•••• 1600 2000 2400 2800 3200 3600 4000 4400 4800 5200 Vertical Section at 243.28° [400ft/in] bp COMPANY DETAI REFERENCE INFORMATION SURVEY PROGRAM Plan: MPS -24 wp07 (Plan MPS- 24/Plan MPS -24) - Amoco Co-ordinate (WE) Ref We11 Centre: Plan MPS -2A, Tao North Depth Fm Depth To Survey/Plan Tool Created By' Ken Allen Date: 2/24/2003 O RE Venial (13/13) Reference: S -Pad Dev 72.00 C alculation Method: Minimum Caroline Section (VS) Reference Slot - (0.00N,0.00E) 4913.00 8219.78 Planned: MPS-24 wp07 V4 MWD+IPR +MS Checked: Date: Error System: 1SCWSA Measured Depth Reference: S -Pad Dev 72110 Scan Method: Tray Cylinder North Calculation Method: WPM= Curvature Error Surface Elliptical + Casing Reviewed: Date: Warning Method: Rules Based ,ow■ CASING DETAILS WELL DETAILS N:une +N/ -S +E/ -W Northm8 Easting IaliIde Longitude Slot No. TVD MD Name Size Plan MPS -24 -16.99 -601.66 5999955.67 565743.57 70 149 N/A 1 3897.00 8219.77 4 " screens 4.000 TARGET DETAILS All TVD depths are Name TVD oW -s +E/ -W Northing EasWtg shape FORMATION TOP R DETAILS MPS-24 T6 3897.00 - 2195.58 - 4361.48 5997722.00 561402.00 Point /n{ /T(� MPS-24 T5 3927.00 - 2055.09 - 3846.17 5997867.00 561916.00 Point ssTVD plus 72 for KBE. MPS-24 T4.1 3987.00 - 1755.10 - 3159.44 5998173.00 562600.00 Point No TVDPath MDPath Formation MPS -24 T3.1 3992.00 - 1487.97 - 2942.06 5998442.00 562815.00 Point MPS-24 T2.1 4012.00 - 648.87 - 2259.58 5999287.00 563490.00 Point 1 4040.00 4928.63 SBFI -NBR MPS-24 Poly 4012.00 283.18 - 1796.32 6000223.00 563945.00 Polygon SECTION DETAILS See MD Inc Azi TVD +N / -S +E/ -W DLeg TFace VSec Target f - s i >- 1 4913.00 78.00 219.20 4037.00 - 200.03 - 1893.58 0.00 0.00 1781.31 5 - i - I _ 2 5052.84 94.78 219.20 4045.77 - 307.80 - 1981.47 12.00 -0.02 1908.27 11 ` 4. a ,,, °-- -- 3 5374.73 94.78 219.20 4018.95 - 556.40 - 2184.19 0.00 0.00 2201.11 4 5419.25 93.00 219.19 4015.93 - 590.82 - 2212.26 4.00 - 179.83 2241.66 5 5494.25 93.00 219.19 4012.00 - 648.87 - 2259.58 0.00 0.00 2310.04 MPS -24 12.1 6 5543.91 91.01 219.12 4010.26 - 687.35 - 2290.92 4.00 - 178.02 2355.33 7 6575.68 91.01 219.12 3992.01 - 1487.69 - 2941.83 0.00 0.00 3296.59 8 6576.05 91.00 219.12 3992.00 - 1487.97 - 2942.06 4.00 - 175.02 3296.93 MPS -24 T. 9 6639.69 90.05 216.76 3991.42 - 1538.16 - 2981.18 4.00 - 111.88 3354.44 10 6759.32 90.05 216.76 3991.31 - 1634.01 - 3052.77 0.00 0.00 3461.48 11 6920.94 93.00 226.00 3987.00 - 1755.10 - 3159.44 6.00 72.21 3611.21 MPS -24 T4.1 12 7437.12 95.33 256.97 3948.59 - 1998.02 - 3606.13 6.00 84.64 4119.42 13 7608.37 95.33 256.97 3932.69 - 2036.47 - 3772.24 0.00 0.00 4285.08 14 7684.83 93.21 254.75 3927.00 - 2055.09 - 3846.17 4.00 - 133.58 4359.49 MPS -24 T5 Start Dir 12/100' : 4913' MD, 4037TVD 15 8219.78 93.21 254.75 3897.00 - 2195.58 - 4361.48 0.00 0.00 4882.93 MPS -24 T6 1 Plan MPS -24 (Plan MPS- 24PB1) 1 ■ ■ ■ ■ ■ ■ ■■ ■■■ ■ ■ ■ ■■ ■■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■ ■ ■ ■ ■ ■ ■■. 2 \■V% 0%% l•••••••• ■ ■ ■ ■■ ■ ■ ■■■ ■ ■■■ ■ ■■ ■■■ ■■■ ■■ ■ ■■I ■ ►\\ I■ //1`1 I•••••••• ■■ ■■■■■■■■EGIEL i�6�ILT ■MEMO7I/■■ ■►i■■ ///` 1 1 1 ■■ ■ ■ ■■■■ ■ ■ ■ ■■■ ■■■■■1�► MI EEPRIRTlI�WMMEr•■■G■■■ / Ad 1 1 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■w■ +o' 549x74, • �11■11�■E■■■�■■■■' •••••• ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■•1119 iiiiili6EMINI. DAIMON / / 0% % %%% 1 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■■■ ■ ■■■ ■I \'n■II■■ ■II■ // 0401k%441%4% / 701 1 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■ ■ ■ ■I ■ ■ ■I ■a,■ ■■ / / 0 0P%%1%141%%k% 1■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ /• ■ ■■ MME 1111 / G 1■■■■ ■■ ■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ / %■■ /I ■ ■■ 1 111 111.1 z o /// //1■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ / ■ ■ ■■ ■ ■■ g 1 ■■ ■■■ ■■ ■■■■■■■■■■■ ••••••••11%•••0•1111%•• ■■■■ 1• ■■■ ■■■■■■■ ■ ■ ■ ■■■ ■ ■ ■ ■■■ ■ ■■I ■■■I■ ■ ■I ■■■ ■ ■ ■■ I��������r�� �rrr����rr��M������� %�����U... 00°P001°%441%4%111*4k 1 ■ ■ ■ ■ ■■■ ■■31T1h+1�I Shitialalia1i ■LELM■■■ %■ ■ ■I ■■■■ ■■■■■ i IM ■■■■■■■■■■■■■ ■■■ ■■■■■■IAUMM►I■■ ■II■■■■■■ ■■■■ 1' °000 °°0 0 4% 4 411 4 %% % %Pl% `,�' -141 1■■ ■■ 20C �i II■ GEm1I1Vi7 [�3I® Yllul;■■\\\�I /■ ■■M TMITt1[■■ ■■ ■■ �ggi ///. 11` `,, • 1■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■■■�►■■■cii ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ! ` " 1 1■■■■■■■■■■■■ ■■ ■ ■ ■G■ ■■ ■11■■■■■■■■ ■■■ ■ ■■■■ ■ ■■ 1 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■• / ■wA■�11 ■ ■MI■ ■111 ■ ■ ■ ■ ■ ■ ■ ■ ■ ME= / /• .•• • ` ' �``` 1■■■■■■■■■■■■ ■i ■■Wi1i11ii1illU■■ ■ ■■■■ ■ ■■ ■■ >� � - `1 ••••. •KIIIMMESTa' 2133E1 •• / %•••I•• •••••••••• ii.. I =. ■■■■■ ■■■.■■■ ■1■ ■ ■■ ■.. ■■■■..■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ,� 0 � �► X14 . .A6 8 %1 I■1lla ET111 Ii■■■■ ■■■ /_••■■■■■■■■■■■ ■ ■ ■■■■■■■■■■■ ������� 21ot 1 ■ ■r■ 1111■ I■■■ IR. 'i►■ ■■■lr;�■ %■■ ■ ■■ ■■■■■■ ■■■ ■ ■ ■■ � �' 1■■■ ■■!i■/5ii■■\\■\\ ■■■■■Ilt�i�tfi7 3■!■�MIMMI1'a■ ••• .� . . ■ � Qb 1■ ■■■■ i:' A■■■■ ■■\ ■ ■ ■■ ■ ■■ ■ ■ ■ ■ ■ ■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ •■■ �'� • 1■■■■ Mi lli ta2•• ■\ ■ ■111∎71�1l1 ■111111l11.� •1/111 fWHI�A!121�i1■■ ■ ■■■ , .. .. . 1■■■MI■I■EKII1MMIIII 1!.■■■ fiiiiWiiWY ■Wi■iiiYtifii/Wiil ■ ■ ■ ■ ■■ , . .. .. 1■■ I■■■■ UG11111■■■■■■■■ ■■ ■ ■■ ■■■■■■ ■■■ ■ ■■ ■ ■■■■ ■ • .•. • ..• y I 1■ IIU.l G71■■■■ ■■■■■ ■■■■■■■■■■■■■ ■■■■■■ ■ ■■■■■■ ; � .��`� II /SM ■ ■11�R�IVIIII C�L�i' ,� EIIIMIT111■■ ■ ■■■ ■ ■■■■■■■■■■ ■■■ ;�' r�, 1�■■■■■■■■■■ ■■■ ■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ .... z8o1 1■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■■ ■■ -4200 -3500 -2800 -2100 -1400 0 West( -) /East(+) [700ft/in] * s4442 ) BP ) KW A Planning Report MAP COJt1pa~y: Fiëld: . Site: . Well:.. .... WeJJpatþ: BPAmoco Milne Point M PtS Pad Plan MPS;.24 planMPS~24 Date: 2/24/2003 Time: 07:31:57 ,Page: Co-ord~nate(N~) Reference: W~II: Plan MFlS;.24, True North "~rtical (1'VD) Refel'~nce: S-FladDev 72.0 .. .. . . ........ . Section (VS)Referencë: Well (O.OON,O,OOE;243.28¡ð.ZO SurveYÇalculation 1\iIethod: .MinimumCurvature Db: 1 Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2002 Site: M pt S Pad Site Position: From: Map Position Uncertainty: Ground Level: Northing: Easting: 5999978.00 ft 566345.00 ft Latitude: Longitude: North Reference: Grid Convergence: 70 24 37.329 N 149 27 35.171 W True 0.51 deg 0.00 ft 0.00 ft Well: Plan MPS~24 Slot Name: Well Position: +N/-S -16.99 ft Northing: 5999955.67 ft Latitude: +E/-W -601.66 ft Easting: 565743.57 ft Longitude: Position Uncertainty: 0.00 ft 70 24 37.161 N 149 27 52.806 W Wellpath: Plan MPS~24 +N/-S ft 0.00 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 Plan MPS-24PB1 4913.00 ft Mean Sea Level 25.60 deg 80.81 deg Direction deg 243.28 2/12/2003 4 From: Definitive Path Current Datum: Magnetic Data: Field Strength: Vertical Section: S-Pad Dev 2/12/2003 57508 nT Depth From (TV D) ft 0.00 Height 72.00 ft Plan: MPS-24 wp07 Date Composed: Version: Tied-to: Principal: Yes Casing Points MO TVD Diameter Hole Size Name ft ft· in .in 8219.77 3897.00 4.000 6.125 4 " screens Formations MD TVD Formations Lithology Dip Angle Dip Direction ft ft deg deg 0.00 SBF1-NB 0.00 0.00 4928.63 4040.00 SBF1-NBR 0.00 0.00 0.00 SBE4-NC 0.00 0.00 Targets Map Map <-- Latitude --> <__- . Longitude --> Name Description TVD +N/-S +E/-W Northing Easting Deg· Min Sec Deg Min . Sec Dip. Dir. ft ft ft ft ft MPS-24 T6 3897.00 -2195.58 -4361.48 5997722.00 561402.00 70 24 15.556 N 149 30 0.606 W MPS-24 T5 3927.00 ~2055.09 -3846.17 5997867.00 561916.00 70 24 16.940 N 149 29 45.508 W MPS-24 T4.1 3987.00 -1755.10 -3159.44 5998173.00 562600.00 70 24 19.894 N 149 29 25.389 W MPS-24 T3.1 3992.00 -1487.97 -2942.06 5998442.00 562815.00 70 24 22.522 N 149 29 19.022 W MPS-24 T2.1 4012.00 -648.87 -2259.58 5999287.00 563490.00 70 24 30.776 N 149 28 59.030 W M P8-24 Poly 4012.00 283.18 -1796.32 6000223.00 563945.00 70 24 39.944 N 149 28 45.459 W -Polygon 1 4012.00 283.18 -1796.32 6000223.00 563945.00 70 24 39.944 N 149 28 45.459 W ·Polygon 2 4012.00 -1419.04 -3160.49 5998509.00 562596.00 70 24 23.199 N 149 29 25.424 W ·Polygon 3 4012.00 -1821 .12 -4066.15 5998099.00 561694.00 70 24 19.240 N 149 29 51.958 W ) BP ) KW A Planning Report MAP Company: SP Amoco Date:.· 2/24/2003·· Time: . 07:31 :57 Page: · FieÏd: .. Milne Point Có;.ordillate(NE) Reference: . . Well: Plan MPS~24, True North Site: MPtSPad Ver~ical(TVD) Reference: S·Pad Dev 72.0 ·Weu: þlanMP$.24 . Seçtion(VS)Reference: .. W~11 (O.00N,0.qOE,243.28Azi) WeUpath: Plan MPS..,24 .. Su.rv~yCalculatiøll Metllod.: Minimum Curvature· . Db: Targets ~ap. :<·":;;;'Latitude . ....:;;> <~;'Longitude ...;.;.~ Name Nørthii1g o.eg Mtn.· · .Sec .. .... Deg}\iIin ...... S~ê< ft ft -Polygon 4 5997235.00 561008.00 70 24 10.798 N 149 30 12.268 W -Polygon 5 5997718.99 562521.00 70 24 15.435 N 149 29 27.815 W -Polygon 6 5999605.00 564027.00 70 24 33.859 N 149 28 43.211 W Plan Section Information MD .. 'Iild Adm TVO +N/-S +E/..,W OLS· Build· Turll ·TFO ft peg dég ft ft ft deg/100ft deg/100ftdeg/1 o Oft . deg 4913.00 78.00 219.20 4037.00 -200.03 -1893.58 0.00 0.00 0.00 0.00 5052.84 94.78 219.20 4045.77 -307.80 -1981.47 12.00 12.00 0.00 -0.02 5374.73 94.78 219.20 4018.95 -556.40 -2184.19 0.00 0.00 0.00 0.00 5419.25 93.00 219.19 4015.93 -590.82 -2212.26 4.00 -4.00 -0.01 -179.83 5494.25 93.00 219.19 4012.00 -648.87 -2259.58 0.00 0.00 0.00 0.00 MPS-24 T2.1 . 5543.91 91.01 219.12 4010.26 -687.35 -2290.92 4.00 -4.00 -0.14 -178.02 6575.68 91.01 219.12 3992.01 -1487.69 -2941.83 0.00 0.00 0.00 0.00 6576.05 91.00 219.12 3992.00 -1487.97 -2942.06 4.00 -3.70 -0.32 -175.02 MPS-24 T3.1 6639.69 90.05 216.76 3991.42 -1538.16 -2981.18 4.00 -1.49 -3.71 -111.88 6759.32 90.05 216.76 3991.31 -1634.01 -3052.77 0.00 0.00 0.00 0.00 6920.94 93.00 226.00 3987.00 -1755.10 -3159.44 6.00 1.82 5.72 72.21 MPS-24 T4.1 7437.12 95.33 256.97 3948.59 -1998.02 -3606.13 6.00 0.45 6.00 84.64 7608.37 95.33 256.97 3932.69 -2036.47 -3772.24 0.00 0.00 0.00 0.00 7684.83 93.21 254.75 3927.00 -2055.09 -3846.17 4.00 -2.76 -2.90 -133.58 MPS-24 T5 8219.78 93.21 254.75 3897.00 -2195.58 -4361.48 0.00 0.00 0.00 0.00 MPS-24 T6 Survey MD Incl Adm TVo. Sys .TVo. .l\1apN MapE VS o.LS TFO ft .·deg cieg ft ft ft ft ft d~gl1 POft .. ... d~g 4913.00 78.00 219.20 4037.00 3965.00 5999739.00 563852.00 1781.31 0.00 0.00 MWD+IFR+MS 4925.00 79.44 219.20 4039.35 3967.35 5999729.81 563844.64 1792.05 12.00 359.98 MWD+IFR+MS 4928.63 79.88 219.20 4040.00 3968.00 5999727.03 563842.41 1795.31 12.00 359.98 SBF1-NBR 4950.00 82.44 219.20 4043.28 3971.28 5999710.55 563829.21 1814.59 12.00 359.98 MWD+IFR+MS 4975.00 85.44 219.20 4045.92 3973.92 5999691.15 563813.67 1837.28 12.00 359.98 MWD+IFR+MS 5000.00 88.44 219.20 4047.26 3975.26 5999671.67 563798.07 1860.07 12.00 359.98 MWD+IFR+MS 5025.00 91 .44 219.20 4047.28 3975.28 5999652.16 563782.45 1882.89 12.00 359.98 MWD+IFR+MS 5050.00 94.44 219.20 4046.00 3974.00 5999632.68 563766.84 1905.68 12.00 359.98 MWD+IFR+MS 5052.84 94.78 219.20 4045.77 3973.77 5999630.47 563765.07 1908.27 12.00 359.98 MWD+IFR+MS 5100.00 94.78 219.20 4041.84 3969.84 5999593.79 563735.70 1951.17 0.00 0.00 MWD+IFR+MS 5200.00 94.78 219.20 4033.51 3961.51 5999516.02 563673.41 2042.15 0.00 0.00 MWD+IFR+MS 5300.00 94.78 219.20 4025.17 3953.17 5999438.24 563611.12 2133.13 0.00 0.00 MWD+IFR+MS 5374.73 94.78 219.20 4018.95 3946.95 5999380.12 563564.57 2201.11 0.00 0.00 MWD+IFR+MS 5400.00 93.77 219.19 4017.06 3945.06 5999360.45 563548.82 2224.12 4.00 180.17 MWD+IFR+MS 5419.25 93.00 219.19 4015.93 3943.93 5999345.46 563536.81 2241.66 4.00 180.17 MWD+IFR+MS 5494.25 93.00 219.19 4012.00 3940.00 5999287.00 563490.00 2310.04 0.00 0.00 MPS-24 T2.1 5500.00 92.77 219.18 4011.71 3939.71 5999282.52 563486.41 2315.28 4.00 181.98 MWD+IFR+MS 5543.91 91.01 219.12 4010.26 3938.26 5999248.25 563459.01 2355.33 4.00 181 .98 MWD+IFR+MS 5600.00 91.01 219.12 4009.27 3937.27 5999204.43 563424.01 2406.50 0.00 0.00 MWD+IFR+MS 5700.00 91.01 219.12 4007.50 3935.50 5999126.32 563361.61 2497.73 0.00 0.00 MWD+IFR+MS 5800.00 91.01 219.12 4005.73 3933.73 5999048.20 563299.22 2588.96 0.00 0.00 MWD+IFR+MS 5900.00 91.01 219.12 4003.96 3931.96 5998970.09 563236.82 2680.18 0.00 0.00 MWD+IFR+MS 6000.00 91.01 219.12 4002.19 3930.19 5998891.97 563174.43 2771.41 0.00 0.00 MWD+IFR+MS 6100.00 91.01 219.12 4000.42 3928.42 5998813.86 563112.03 2862.64 0.00 0.00 MWD+IFR+MS 6200.00 91.01 219.12 3998.65 3926.65 5998735.75 563049.64 2953.87 0.00 0.00 MWD+IFR+MS 6300.00 91.01 219.12 3996.88 3924.88 5998657.63 562987.24 3045.10 0.00 0.00 MWD+IFR+MS 6400.00 91.01 219.12 3995.11 3923.11 5998579.52 562924.85 3136.32 0.00 0.00 MWD+IFR+MS 6500.00 91.01 219.12 3993.35 3921.35 5998501.40 562862.45 3227.55 0.00 0.00 MWD+IFR+MS 6575.68 91.01 219.12 3992.01 3920.01 5998442.29 562815.23 3296.59 0.00 0.00 MWD+IFR+MS ) BP ) KW A Planning Report MAP Company: BP Amoco·· Date: . 2/24/2003.·· . Time: 07:31 :57 Page: Field: Milne. Point Co;.ordinate(NE)·Reference: 'Nell:PlarlMP~~24. True North. Slt~: M.PtSPad Yel'ti~al(TVD)..Reference: .. S~Pad D~v 72.0 . ... WeJl: PlanMPS~24 Section..(Y~)Refer.enc~:.. Well (0,OON,O.OOE,243.28Azi). Wellpatl1: Plan MPS;;24 Sµrvey ÇålculåtionMetholl: Minhl1urnCurväture· Db: Survey MD. Incl AziDi TVD Sys TVD MapE VS· DLS TFO toollçomm~nt . ft. ··deg deg ft ft :\··ft· . ft · degJ10()ft d~g. 6576.05 91.00 219.12 3992.00 3920.00 562815.00 3296.93 3.72 184.98 MPS-24 T3.1 6600.00 90.64 218.23 3991.66 3919.66 5998423.17 562800.20 3318.70 4.00 248.12 MWD+IFR+MS 6639.69 90.05 216.76 3991.42 3919.42 5998391.47 562776.32 3354.44 4.00 248.10 MWD+IFR+MS 6700.00 90.05 216.76 3991.36 3919.36 5998342.85 562740.66 3408.40 0.00 0.00 MWD+IFR+MS 6759.32 90.05 216.76 3991.31 3919.31 5998295.01 562705.59 3461.48 0.00 0.00 MWD+IFR+MS 6800.00 90.80 219.08 3991.01 3919.01 5998262.71 562680.88 3498.24 6.00 72.21 MWD+IFR+MS 6850.00 91.71 221.94 3989.92 3917.92 5998224.43 562648.75 3544.32 6.00 72.23 MWD+IFR+MS 6900.00 92.62 224.80 3988.03 3916.03 5998187.82 562614.76 3591.30 6.00 72.29 MWD+IFR+MS 6920.94 93.00 226.00 3987.00 3915.00 5998173.00 562600.00 3611.21 6.00 72.40 MPS-24 T4.1 6950.00 93.16 227.74 3985.44 3913.44 5998152.98 562579.01 3639.04 6.00 84.64 MWD+IFR+MS 7000.00 93.43 230.73 3982.56 3910.56 5998120.06 562541.49 3687.46 6.00 84.74 MWD+IFR+MS 7050.00 93.69 233.73 3979.45 3907.45 5998089.16 562502.33 3736.43 6.00 84.91 MWD+IFR+MS 7100.00 93.94 236.72 3976.12 3904.12 5998060.35 562461.61 3785.82 6.00 85.10 MWD+IFR+MS 7150.00 94.19 239.72 3972.58 3900.58 5998033.71 562419.45 3835.49 6.00 85.30 MWD+IFR+MS 7200.00 94.41 242.72 3968.83 3896.83 5998009.33 562375.98 3885.31 6.00 85.51 MWD+IFR+MS 7250.00 94.63 245.72 3964.89 3892.89 5997987.26 562331.30 3935.15 6.00 85.73 MWD+IFR+MS 7300.00 94.84 248.72 3960.76 3888.76 5997967.57 562285.53 3984.85 6.00 85.97 MWD+IFR+MS 7350.00 95.03 251.73 3956.46 3884.46 5997950.31 562238.82 4034.29 6.00 86.22 MWD+IFR+MS 7400.00 95.20 254.74 3952.00 3880.00 5997935.53 562191.27 4083.34 6.00 86.48 MWD+IFR+MS 7437.12 95.33 256.97 3948.59 3876.59 5997926.18 562155.51 4119.42 6.00 86.74 MWD+IFR+MS 7500.00 95.33 256.97 3942.76 3870.76 5997911.53 562094.65 4180.24 0.00 0.00 MWD+IFR+MS 7608.37 95.33 256.97 3932.69 3860.69 5997886.28 561989.76 4285.08 0.00 0.00 MWD+IFR+MS 7684.83 93.21 254.75 3927.00 3855.00 5997867.00 561916.00 4359.49 4.00 226.42 MPS-24 T5 7700.00 93.21 254.75 3926.15 3854.15 5997862.89 561901.43 4374.33 0.00 0.00 MWD+IFR+MS 7800.00 93.21 254.75 3920.54 3848.54 5997835.78 561805.34 4472.18 0.00 0.00 MWD+IFR+MS 7900.00 93.21 254.75 3914.93 3842.93 5997808.68 561709.26 4570.03 0.00 0.00 MWD+IFR+MS 8000.00 93.21 254.75 3909.33 3837.33 5997781.57 561613.18 4667.88 0.00 0.00 MWD+IFR+MS 8100.00 93.21 254.75 3903.72 3831.72 5997754.47 561517.09 4765.73 0.00 0.00 MWD+IFR+MS 8200.00 93.21 254.75 3898.11 3826.11 5997727.36 561421.01 4863.57 0.00 0.00 MWD+IFR+MS 8219.78 93.21 254.75 3897.00 3825.00 5997722.00 561402.00 4882.93 0.00 0.00 MPS-24 T6 r-.----r-, I I r 1 I I L J I I I I ~ .31 ~ I MPS-29i ~ I I MPS-27 -$- I ï NPS-24r -+ 1 I .21i I L J I I I .15i I ~ ~ --L · 91 I I MPS-7i -+- I -o ~ ., I ~SEc'" - - r- ....... I -~ -' 12 T . 'I SEer '1 rdl..N F?7 I I r'2N '. .DE: , R17f:. l- I I I i ~ I I ~~ I h ~.... - ~f¡:!c, -1. _ _ _T- - - L - _.L ~I /~ ./ .. ." ) ) 22 2& 21 .,~,..,.,-r: (27 ~G-PAD ~:. PLANT J 15'00'00" GRID " os 3r~" u, K.;,.Þð "A:1 6" 5 PRoJECTJ S-PAD /J=I-='\ 12 7 a 9 10 ;i ._ J+ H-PAD TIJN T12N 2 33 MPU S-P AD IFGFNIl 14- ILl..... 13 ~ ~ 18 15 17 16 + AS-BUILT CONDUCTOR EXISTING CONDUCTOR VICINITY MAP N,T.S. . --- NOTES: 1. DATE OF SURVEY: NARCH 26, 28, & 31, 2002. 2. REFERENCE FIELD BOOK: MP02-0J PGS. 61-69, NP02-0+ PGS. 9-11. 3. COORDINATES ARE ALASKA STATE PLANE, ZONE-4 NAO-27. 4. GEODETIC COORDINATES ARE NAD-27. 5. MPU S-PAD AVERAGE SCALE FACTOR IS: 0.999904923. 6. HORIZONTAL CONTROL IS BASED ON MPU CFP MONUNENT CFP-3 AND NPU H-PAD MONUMENT H-1. 7. ELEVATIONS ARE BPX MEAN SEA LEVEL BASED ON MILNE POINT PIPELINE VERTICAL CONTROL. SURVEYOR'S CERTI FICA TE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND UCENSED TO PRACTICE LAND SURVEYING IN lHE STATE OF ALASKA AND THAT lHlS PLAT REPRESENTS A SURVEY MADE 8Y ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF MAR CH 31, 2002. PLANT CO OR D IN A TES N= 2,236.84 E= 6.868.95 N= 2.237.07 E= 6,613.90 N= 2,2.36.95 E= 6,569.00 N= 2,2.36.98 E= 6,538.80 12., T. 12 N., R. 10 E., UMIAT MERIDIAN, ALASKA GEODETIC GEODETIC CELLAR SECTION POSITION(DMS) POSIllON{D.DD} BOX ELEV. OFFSETS 70L4'37.787" 70.4104965" 3,353' FSL 149.,7145.570" 149.46?6583" 38.9 20' FEL 70'24'37.162" 70.4103228' 39.1' 3.289' FSL 149L7'52.809" 1 49.4646692" 267' FEL 70"24'37.050" 70.4102917" 39.3' 3,278' FSL 1 49"27154.083" 1 49.4650231 . .311' FEL 70L4'36.976" 70.4-102711" 39.1' 3,270' FSL 149'27'54.940" 149.4652611" 340' FEL LOCATED WITHIN PROTRACTED SEC. WELL A.S.P. NO. COORDINATES MPS- T y= 6,000,021.49 I x= 565.989.85 MPS-241 Y=5,999.955.70 x= 565.743.45 MPS-27 Y=5,999.94.3.96 x= 565,700.12 MPS-29' y= 5,999,9.36.18 I x= 565,670.94 F. ~b1) DRMW; JACOBS Obp t-- -- . CItE CIIED: ALLISON lL DAtE: 3/lß/02 DRAWNO: 9-£ET~ FRB02 MPS 10-00 MILNE POINT UNIT S-PAD iä100bo .œ NO; IiC IILÐ AS-BUlL T CONDUCTORS o ~/07/02.I!i5Um FOR IroFOAMATlON JJ C LOi ....... .. ute ....... WELLS MP $-71, 24i, 27 ðc 29i 1 t\" 1 .. .... ....... u..: I'. 200' NO. DATE R[\I S~ BY CHI<. -. M.WCA _ 11105 500 7"· 11:0 ~ ~ 20 ~a g 51: 0 ~ 21811 b"a -~~----~_._~~_._~-~-,--_._--- -_.._-~-~_.~ --- - -~ -~_._~-------------------~ --~.-~~..--~--------~~-.--- -------·~-1 ***************$100.00***1 - --~-------~ NOk~~~:~~~¿20DAYS r~'~::'::~~~' .. '~.:.:~ ~:-~~~~~..;. ::..:~:. . ALASKA OIL & GAS CONSERVATION COMMISSION 333 W 7TH AVENUE SUITE 100 ANCHORAGE, AK 99501 TO THE ORDER OF: December 19, 2002 ¡\MOUNT DATE ~!GI'·t· !U¡t /.....1 n r-" ..,,,. l,,)'. 1-' . :~;~..!L PAY: 055007 NOaP 56-389 412 NATIONAL CITY BANK Ashland, Ohio ßP EXPLORATION, (ALASKA) INC. PI1UDI-IOE ß/W UNIT 11() BOX '196612 !\[\!CI K>RAGE, AK 99b'! 9-6612 CONSOLIDATED COMMERCIAl.. /CCC_"I _4~_________ "_ ~----'- ...-------- ---~-----~ . --'._-~- --~------ ----~~"-T==-==_~_=_= '~; :!\'rm;;;H'"'~ ~:I~~I~~~J~'~~~~:T FOR ITEMS DESCRIB~~~~~~ ~ ---.. / RiCEIVED MtR 1 0 2003 MIIIIlIaOil_QI¡.;IÅ!=~]1 i ... ! .- ~. _ i , . . I i PERMIT TO DRILL FEE 12/19/2002 INV# CK121702P VEND on DISCOUNT· . --1=--==-- f~ji~~=~~_~== GROSS L_~~CRIPTION _.-_._-_._-~~ -~ "----------- INVOICE / CREDIT MEMO DATE -.. ---------_.~-----.----~~ --ëHECK¡~'l i P055007 ! 12/19/2002 ¡p055007 DArE Rev: 07/10/02 C\j ody\templates ) ) TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMtTTAL LETTER WELL NAME mP ~ - 2-9 . PTD# 203 -038 CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL The permit is for a new wellbore segment of existing well Permit No, API No. Production should continue to ·be reported as a function· of the original API number stated above. "CLUE" (If API number last two (2) digits are between 60-69) PILOT (PH) HOLE In accordance with 20AAC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both . ~ na~e, (name on permit plus PH) A1f"..:s...ZýPHand API number· (50 ôz..1·z;.~!'¿ ~ 76 /?70Ì80) from records, data and logs acquired '-rõ¡: well (name on permit). .. SPACING EXCEPTION The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. DRY DITCH SAMPLE All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. WELL PERMIT CHECKLIST COMPANY Af3< WELL NAME IlJp.:S -,2 f FIELD & POOL .J:)2S /c./l::> INIT CLASS ~() lOlL- ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . 3. Unique well name and number. . . . . . . . . . . . . . . . . 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . 5. Well located proper distance from drilling unit boundary. . . . 6. Well located proper distance from other wells.. . . . . . . . . 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . h.. 3 . //.D3 8. If deviated, is we II bore plat included.. . . . . . . . . . . . . . j:;>lL- 9. Operator only affected party.. . . . . . . . . . . . . . . . . . 10. Operator has appropriate bond in force. . . . . . . . . . . . . 11. Permit can be issued without conservation order. . . . . . . . N 12. Permit can be issued without administrative approval.. . . . . N (Service Well Only) 13. Well located wlin area & strata authorized by injection order # . LJ.- - y~ (Service Well Only) 14. All wells wlin X mile area of review identified. . . . . . . . . jJ'7J./Y N ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . ~N 16. Surface casing protects all known USDWs. . . . . . .. . . N f"'~ ~ 17. CMT vol adequate to circulate on conductor & surf csg. . . . Y. N '-.:>t- ~ \# 18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . Y ® ...., Ð .. \\ '\ ~. ~~ ~ 19. CMT will cover all known productive horizons. . . . . . . . . . Y.Q'õ ~~~ ('->c ~'" ~ t\ ~ \~,~ , \ '" ~ 20. Casing designs adequate for C, T, B & permafrost. . . . . . . Ci)N \. . ~\ ~ '"' \ _ 21. Adequate tankage or reserve pit. . . . . . . .. . . . . . . . . Y N ~Þ..-.~~,~~~\""\,'.ñ.~., ~~C\-.~~~ ~~~... ~\"T"" 22. If a re-drill, has a 10-403 fo.r abandonment been approved. . . V N ~~ t "~ \...rL~~ 23. Adequate wellbore separation proposed.. . . . . . . . . . . . N N\ ('~~~ç'm~1 J\ \C)~~~~ 24. If diverter required, does it meet regulations. . . . . . .' . . . N. .. ~ 25. Drilling fluid program schematic & equip list adequate. . . ~ . N ~*"f'~ ~~''-' ~ ~..~ ç \('o,,~cJ~\J0 ~ r \ 26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N APPR DATE 27. BOPE press rating appropriate; test to ~() psig. N "'"'-~S~ Q~\-~ \.SS'-\ ~\ V.G?M 3 28. Choke manifold complies wlAPI RP-53 (May 84). . . . . . . . N .ktJ..'1I \ I(Ca~ 29. Work will occur without operation shutdown. . . . . . . . . . . Y I 30. Is presence of H2S gas probable.. . . . . . . . . .. . . . . . Y ~ 31. Mechanical condition of wells within AOR verified. . . . . . . . -¥-N" \.) ~ 32. Permit can be issued wlo hydrogen sulfide measures. . . . (Î)N 33. Data presented on potential overpressure zones. . . . . . .. 1* 34. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Nit N 35. Seabed condition survey (if off-shore). . . . . . . . Y N 36. Contact namelphone for weekly progress reports. ...... Y N APPR DATE (Service Well Only) GEOLOGY APPR DATE µ $·//.ö3 (Exploratory Only) Rev: 2/25/03 \well_perm it_checklist PROGRAM: Exp _ Dev ~Redrll_ Re-Enter _ Serv _ Well bore seg_ GEOL AREA Bern UNIT# 0/ /32.$S ON/OFF SHOREc2!2 (' ( UIC ENGINEER JR COMMISSIONER: :J..... SP 97/ <?A3 RR DS Comments/Instructions: GEOLOGY: RPC_ PETROLEUM ENGINEERING: TM~1)VL RESERVOIR ENGINEERING JH SFcþ- WA MW ) ) Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Pennitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ) ') !9ð3-03z:1 , \ 9q G Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue May 20 11:08:31 2003 Reel Header Service name. . . . . . . . . . . . .LISTPE Date.................... .03/05/20 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name..... ..UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name. . . . . . . . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . . 03/05/20 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name..... ..UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-24 500292314200 B.P. Exporation (Alaska) Inc. SperrySun Drilling Services 20-MAY-03 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0002399225 T. MCGUIRE C. DIXON MWD RUN 2 MW0002399225 T. MCGUIRE C. DIXON MWD RUN 3 MW0002399225 T. MCGUIRE C. DIXON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 MW0002399225 T. MCGUIRE C. DIXON MWD RUN 5 MW0002399225 J. STRAHAN D. FERGUSON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: 12 12N 10E 3289 ~; ~~;' '~', j c:: ~~~ ~,,~ \:) \~ ~ l··¡-: _,~ ) ) FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 267 72.45 39.10 # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE BIT SIZE (IN) 13.500 9.875 6.125 CASING SIZE (IN) 20.000 10.750 7.625 DRILLERS DEPTH (FT) 112.0 2704.0 4886.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELL SECTION WAS EFFECTED BY MEANS OF AN OPEN-HOLE SIDETRACK AT 6446'MD/4000'TVD IN THE MPS-24 PB2 WELLBORE. 4. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS. 5. MWD RUN 2 COMPRISED DIRECTIONAL WITH DGR AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 6. MWD RUN 3 WAS DIRECTIONAL ONLY TO POSITION THE WHIPSTOCK AND MILL THE WINDOW. SGRC DATA OVER THE RUN 3 INTERVAL WERE ACQUIRED WHILE RIH FOR RUN 4. 7. MWD RUNS 4 & 5 COMPRISED DIRECTIONAL WITH DGR¡ EWR4¡ PRESSURE WHILE DRILLING (PWD) ¡ AND AT-BIT-INCLINATION (ABI). 8. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC., DATED 5/15/03. MWD DATA ARE CONSIDERED PDC. 9. MWD RUNS 1 - 5 REPRESENT WELL MPS-24 WITH API#: 50-029-23142-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 8205'MD/3890'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW ) ) SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP FET RPD RPM RPS RPX $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 69.5 112.5 2669.5 2669.5 2669.5 2669.5 2669.5 STOP DEPTH 8149.5 8205.0 8156.5 8156.5 8156.5 8156.5 8156.5 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD $ # REMARKS: BIT RUN NO 1 2 3 4 5 MERGED MAIN PASS. $ MERGE TOP 69.5 2714.0 4877.0 4901.0 6446.5 MERGE BASE 2714.0 4876.5 4901.0 6446.5 8205.0 # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined ) ') Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 69.5 8205 4137.25 16272 69.5 8205 ROP MWD FT/H 0.12 3209.38 242.017 16186 112.5 8205 GR MWD API 11.03 116.66 61.8552 16161 69.5 8149.5 RPX MWD OHMM 0.48 2000 30.0645 10975 2669.5 8156.5 RPS MWD OHMM 0.53 2000 92.7583 10975 2669.5 8156.5 RPM MWD OHMM 0.61 2000 109.975 10975 2669.5 8156.5 RPD MWD OHMM 0.09 2000 122.789 10975 2669.5 8156.5 FET MWD HOUR 0.07 43.32 1.06708 10975 2669.5 8156.5 First Reading For Entire File......... .69.5 Last Reading For Entire File.......... .8205 File Trailer Service name............ .STSLIB.OOl Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 File Type................ LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 ) File Type... . . . . . . . . . . . . .LO Previous File Name...... .STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 ) header data for each bit run in separate files. 1 .5000 START DEPTH 69.5 112.5 STOP DEPTH 2671.0 2714.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # 18-APR-03 Insite 66.37 Memory 2714.0 112.0 2714.0 .0 32.8 TOOL NUMBER 124725 13.500 112.0 Water Based 9.40 90.0 8.8 400 8.6 .000 .000 .000 .000 .0 68.0 .0 .0 ) REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD010 GR MWD010 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 69.5 2714 1391.75 5290 69.5 2714 ROP MWD010 FT/H 1.4 955.57 214.74 5204 112.5 2714 GR MWD010 API 17.58 114.91 63.3248 5204 69.5 2671 First Reading For Entire File......... .69.5 Last Reading For Entire File.......... .2714 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 File Type................ LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 File Type... . . . . . . . . . . . . .LO Previous File Name...... .STSLIB.002 Comment Record ) FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET GR ROP $ 3 ) header data for each bit run in separate files. 2 .5000 START DEPTH 2669.5 2669.5 2669.5 2669.5 2669.5 2671.5 2714.5 STOP DEPTH 4873.5 4873.5 4873.5 4873.5 4873.5 4873.5 4876.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): 20-APR-03 Insite 66.37 Memory 4874.0 2714.0 4874.0 33.2 77.8 TOOL NUMBER 164580 134760 9.875 2704.0 Water Based 8.70 54.0 9.0 400 6.6 1.700 1.300 4.000 2.400 68.0 91.3 68.0 68.0 ') EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2669.5 4876.5 3773 4415 2669.5 4876.5 ROP MWD020 FT/H 2.15 3209.38 364.709 4325 2714.5 4876.5 GR MWD020 API 11.03 116.66 64.1286 4405 2671.5 4873.5 RPX MWD020 OHMM 0.48 138.53 16.4264 4409 2669.5 4873.5 RPS MWD020 OHMM 0.53 186.48 17.8946 4409 2669.5 4873.5 RPM MWD020 OHMM 0.61 2000 22.0004 4409 2669.5 4873.5 RPD MWD020 OHMM 0.09 2000 43.6976 4409 2669.5 4873.5 FET MWD020 HOUR 0.07 38.2 1.15261 4409 2669.5 4873.5 First Reading For Entire File......... .2669.5 Last Reading For Entire File.......... .4876.5 File Trailer Service name.. ... ....... .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 ) F i 1 e Type................ LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 F i 1 e Type................ LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE ROP $ 4 ) header data for each bit run in separate files. 3 .5000 START DEPTH 4877.0 STOP DEPTH 4901.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: 21-APR-03 Insite 66.37 Memory 4901.0 4874.0 4901.0 .0 .0 TOOL NUMBER 6.750 2704.0 Water Based 8.70 54.0 9.0 400 6.6 .000 .0 .000 .0 ) ') MUD FILTRATE AT MT: MUD CAKE AT MT: .000 .000 .0 .0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD030 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4877 4901 4889 49 4877 4901 ROP MWD030 FT/H 0.12 149.49 34.4316 49 4877 4901 First Reading For Entire File......... .4877 Last Reading For Entire File.......... .4901 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 File Type................ LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 ) Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 File Type................ LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPX RPS RPM FET RPD ROP $ 5 ) header data for each bit run in separate files. 4 .5000 START DEPTH 4874.0 4874.0 4874.0 4874.0 4874.0 4874.0 4901.5 STOP DEPTH 6446.0 6446.0 6446.0 6446.0 6446.0 6445.5 6446.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: 23-APR-03 Insite 66.37 Memory 6446.0 4901.0 6446.0 86.7 96.5 TOOL NUMBER 129046 159439 6.125 2704.0 FLO PRO 9.70 53.0 9.1 90000 5.8 .080 .060 .060 71.0 92.0 72.0 ") ) MUD CAKE AT MT: .080 74.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4874 6446.5 5660.25 3146 4874 6446.5 ROP MWD040 FT/H 21.08 530.95 195.311 3091 4901.5 6446.5 GR MWD040 API 21.6 104.6 52.0805 3145 4874 6446 RPX MWD040 OHMM 0.61 2000 52.6105 3145 4874 6446 RPS MWD040 OHMM 5.31 2000 212.346 3145 4874 6446 RPM MWD040 OHMM 3.83 2000 266.602 3145 4874 6446 RPD MWD040 OHMM 4.56 2000 272.451 3144 4874 6445.5 FET MWD040 HOUR 0.21 43.32 1.26363 3145 4874 6446 First Reading For Entire File......... .4874 Last Reading For Entire File.......... .6446.5 ') File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation..... ..03/05/20 Maximum Physical Record..65535 F i 1 e Type................ LO Next File Name.......... .STSLIB.006 Physical EOF File Header Service name............ .STSLIB.006 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation..... ..03/05/20 Maximum Physical Record..65535 File Type.............. ..LO Previous File Name..... ..STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX GR FET ROP $ 6 ) header data for each bit run in separate files. 5 .5000 START DEPTH 6446.0 6446.5 6446.5 6446.5 6446.5 6446.5 6447.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 8156.5 8156.5 8156.5 8156.5 8149.5 8156.5 8205.0 24-APR-03 Insite 66.37 Memory 8205.0 6446.0 8205.0 87.3 97.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 Electromag Resis. 4 TOOL NUMBER 129046 159439 J $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.. ...0 Logging Direction............... ..Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing................... ..60 .1IN Max frames per record............ . Undefined Absent value...................... -999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O ) 6.125 4886.0 FLO PRO 9.80 53.0 9.2 92000 4.6 .080 .060 .060 .260 72.0 92.0 71.0 74.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD050 FT/H 4 1 68 4 2 GR MWD050 API 4 1 68 8 3 RPX MWD050 OHMM 4 1 68 12 4 RPS MWD050 OHMM 4 1 68 16 5 RPM MWD050 OHMM 4 1 68 20 6 RPD MWD050 OHMM 4 1 68 24 7 FET MWD050 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 6446 8205 7325.5 3519 6446 8205 ROP MWD050 FT/H 1.66 594.11 175.442 3517 6447 ) ) 8205 GR MWD050 API 24.45 101.42 65.694 3407 6446.5 8149.5 RPX MWD050 OHMM 3.55 2000 26.9143 3421 6446.5 8156.5 RPS MWD050 OHMM 4.03 2000 79.3036 3421 6446.5 8156.5 RPM MWD050 OHMM 4.36 2000 79.3677 3421 6446.5 8156.5 RPD MWD050 OHMM 4.99 2000 87.1875 3422 6446 8156.5 FET MWD050 HOUR 0.15 6.58 0.776153 3421 6446.5 8156.5 First Reading For Entire File......... .6446 Last Reading For Entire File.......... .8205 File Trailer Service name............ .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 F i 1 e Type................ LO Next File Name.......... .STSLIB.007 Physical EOF Tape Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . . 03/05/20 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name...... . . . . . . .LISTPE Da te . . . . . . . . . . . . . . . . . . . . . 03/05/20 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File ) ) ') ) 803-03~ '\\~~i- Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue May 20 09:20:51 2003 Reel Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . . 03/05/20 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... .UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Da te. . . . . . . . . . . . . . . . . . . . . 03/05/20 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-24 PB1 500292314270 B.P. Exporation (Alaska) Inc. Sperry-Sun Drilling Services 20-MAY-03 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0002399225 T. MCGUIRE C. DIXON MWD RUN 2 MW0002399225 T. MCGUIRE C. DIXON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 12 12N 10E 3289 267 72.45 39.10 ~;:) rr= C. i= ~.\ I r::. D· {"'Uk""" ii.-. W V ik_ JUN 0 2 2003 '~~~rY~~ A\2!5~a Œ~ l~ G8.~¡ CCìn~. (:o;r¡n~¡:!;i:5km þ-qJ'!C~10r~Je ) ) # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 13.500 20.000 112.0 9.875 10.750 2704.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS. 4. MWD RUN 2 COMPRISED DIRECTIONAL WITH DGR AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC., DATED 5/15/03. MWD DATA ARE CONSIDERED PDC. 6. MWD RUNS 1 AND 2 REPRESENT WELL MPS-24 PB1 WITH API#: 50-029-23142-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 5033'MD/4063'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP RPD RPM RPS RPX FET $ ) ) clipped curves; all bit runs merged. .5000 START DEPTH 69.5 112.5 2669.5 2669.5 2669.5 2669.5 2669.5 STOP DEPTH 4995.5 5033.0 4987.5 4987.5 4987.5 4987.5 4987.5 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ # REMARKS: BIT RUN NO 1 2 MERGED MAIN PASS. $ MERGE TOP 69.5 2714.0 MERGE BASE 2714.0 5033.0 # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing................... ..60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 69.5 5033 2551.25 9928 69.5 5033 ROP MWD FT/H 1.4 3209.38 278.623 9842 112.5 ) ) 5033 GR MWD API 11.03 116.66 63.2707 9853 69.5 4995.5 RPX MWD OHMM 0.48 138.53 19.1348 4637 2669.5 4987.5 RPS MWD OHMM 0.53 218.43 21.8181 4637 2669.5 4987.5 RPM MWD OHMM 0.61 2000 26.2051 4637 2669.5 4987.5 RPD MWD OHMM 0.09 2000 49.0144 4637 2669.5 4987.5 FET MWD HOUR 0.07 38.2 1.11695 4637 2669.5 4987.5 First Reading For Entire File......... .69.5 Last Reading For Entire File.......... .5033 File Trailer Service name............ .STSLIB.OOl Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 File Type............... .LO Next File Name......... ..STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 F i 1 e Type. . . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 69.5 112.5 STOP DEPTH 2671.0 2714.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : 18 -APR- 03 Insite 66.37 Memory ) TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............ ..Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD010 GR MWD010 ) 2714.0 112.0 2714.0 .0 32.8 TOOL NUMBER 124725 13.500 112.0 Water Based 9.40 90.0 8.8 400 8.6 .000 .000 .000 .000 .0 68.0 .0 .0 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 API 4 1 68 8 3 First ') ) Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 69.5 2714 1391.75 5290 69.5 2714 ROP MWDOI0 FT/H 1.4 955.57 214.74 5204 112.5 2714 GR MWDOI0 API 17.58 114.91 63.3248 5204 69.5 2671 First Reading For Entire File......... .69.5 Last Reading For Entire File.......... .2714 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 File Type................ LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name........... ..STSLIB.003 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 F i 1 e Type................ LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET GR ROP $ 3 header data for each bit run in separate files. 2 .5000 START DEPTH 2669.5 2669.5 2669.5 2669.5 2669.5 2671.5 2714.5 STOP DEPTH 4987.5 4987.5 4987.5 4987.5 4987.5 4995.5 5033.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 20-APR-03 Insite 66.37 ) DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O ) Memory 5033.0 2714.0 5033.0 33.2 77.8 TOOL NUMBER 164580 134760 9.875 2704.0 Water Based 8.70 54.0 9.0 400 6.6 1.700 1.300 4.000 2.400 68.0 91.3 68.0 68.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 ) ) RPM RPD FET MWD020 MWD020 MWD020 OHMM OHMM HOUR 4 4 4 1 1 1 68 68 68 20 24 28 6 7 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2669.5 5033 3851.25 4728 2669.5 5033 ROP MWD020 FT/H 2.15 3209.38 350.302 4638 2714.5 5033 GR MWD020 API 11.03 116.66 63.2102 4649 2671.5 4995.5 RPX MWD020 OHMM 0.48 138.53 19.1348 4637 2669.5 4987.5 RPS MWD020 OHMM 0.53 218.43 21.8181 4637 2669.5 4987.5 RPM MWD020 OHMM 0.61 2000 26.2051 4637 2669.5 4987.5 RPD MWD020 OHMM 0.09 2000 49.0144 4637 2669.5 4987.5 FET MWD020 HOUR 0.07 38.2 1.11695 4637 2669.5 4987.5 First Reading For Entire File......... .2669.5 Last Reading For Entire File.......... .5033 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 F i 1 e Type................ LO Next File Name.......... .STSLIB.004 Physical EOF Tape Trailer Service name............ .LISTPE Date.................... .03/05/20 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name. . . . . . . . . . .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Da te. . . . . . . . . . . . . . . . . . . . . 03/05/20 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... .UNKNOWN Continuation Number..... .01 ) ) Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File ) ') é)03--ð3~ 11993" Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue May 20 09:48:18 2003 Reel Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/05/20 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . . 03/05/20 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-24PB2 500292314271 B.P. Exporation (Alaska) Inc. Sperry-Sun Drilling Services 20-MAY-03 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0002399225 T. MCGUIRE C. DIXON MWD RUN 2 MW0002399225 T. MCGUIRE C. DIXON MWD RUN 3 MW0002399225 T. MCGUIRE C. DIXON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 MW0002399225 T. MCGUIRE C. DIXON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: 12 12N 10E ·~R" ... .' J2=' .?"'ì:. ~ ~ '-. g ~........ ~:'~ ~. .' ~,.... ¡¡; ~ r"""" E ~,~~ ¡Þ ~ ,'i ~ ,!t.......~Jk,~1I (:.: b=· 3289 ¡: \¡)J r~ r) U \,.,i ~ ,,'--" j"; ~.\ ,"-... .'1" ¿, ...,: ~: .) ¡)~~~sk.z ¿,:~ ;~:';:.~; 'K~~~\~ ) ) FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 267 72.45 39.10 # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE BIT SIZE (IN) 13.500 9.875 6.125 CASING SIZE (IN) 20.000 10.750 7.625 DRILLERS DEPTH (FT) 112.0 2704.0 4886.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELL SECTION WAS DRILLED OFF OF A WHIPSTOCK IN THE MPS-24 PB1 WELLBORE. THE TOP OF THE WHIPSTOCK WAS AT 4874IMD/4028'TVD. 4. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS. 5. MWD RUN 2 COMPRISED DIRECTIONAL WITH DGR AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 6. MWD RUN 3 WAS DIRECTIONAL ONLY TO POSITION THE WHIPSTOCK AND MILL THE WINDOW. SGRC DATA OVER THE RUN 3 INTERVAL WERE ACQUIRED WHILE RIH FOR RUN 4. 7. MWD RUN 4 COMPRISED DIRECTIONAL WITH DGR¡ EWR4¡ PRESSURE WHILE DRILLING (PWD) ¡ AND AT-BIT-INCLINATION (ABI). 8. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC., DATED 5/15/03. MWD DATA ARE CONSIDERED PDC. 9. MWD RUNS 1 - 4 REPRESENT WELL MPS-24 PB2 WITH API#: 50-029-23142-71. THIS WELL REACHED A TOTAL DEPTH (TD) OF 6760'MD/3977ITVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . ) ) SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 F i 1 e Type................ LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP FET RPD RPM RPS RPX $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 69.5 112.5 2669.5 2669.5 2669.5 2669.5 2669.5 STOP DEPTH 6705.0 6760.5 6712.0 6712.0 6712.0 6712.0 6712.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ # REMARKS: BIT RUN NO 1 2 3 4 MERGED MAIN PASS. $ MERGE TOP 69.5 2714.0 4877.0 4901.0 MERGE BASE 2714.0 4876.5 4901.0 6760.5 # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record........... ..Undefined ) ') Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 69.5 6760.5 3415 13383 69.5 6760.5 ROP MWD FT/H 0.12 3209.38 258.024 13297 112.5 6760.5 GR MWD API 11.03 116.66 60.8206 13272 69.5 6705 RPX MWD OHMM 0.48 2000 30.9399 8086 2669.5 6712 RPS MWD OHMM 0.53 2000 96.3273 8086 2669.5 6712 RPM MWD OHMM 0.61 2000 119.902 8086 2669.5 6712 RPD MWD OHMM 0.09 2000 134.448 8086 2669.5 6712 FET MWD HOUR 0.07 43.32 1.15069 8086 2669.5 6712 First Reading For Entire File......... .69.5 Last Reading For Entire File.......... .6760.5 File Trailer Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..03/05/20 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation..... ..03/05/20 Maximum Physical Record. .65535 ) File Type................ LO Previous File Name...... .STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 ') header data for each bit run in separate files. 1 .5000 START DEPTH 69.5 112.5 STOP DEPTH 2671.0 2714.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # 18 -APR- 03 Insite 66.37 Memory 2714.0 112.0 2714.0 .0 32.8 TOOL NUMBER 124725 13.500 112.0 Water Based 9.40 90.0 8.8 400 8.6 .000 .000 .000 .000 .0 68.0 .0 .0 ) REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD010 GR MWD010 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 69.5 2714 1391.75 5290 69.5 2714 ROP MWD010 FT/H 1.4 955.57 214.74 5204 112.5 2714 GR MWD010 API 17.58 114.91 63.3248 5204 69.5 2671 First Reading For Entire File......... .69.5 Last Reading For Entire File.......... .2714 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 F i 1 e Type................ LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 F i 1 e Typ e. . . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.002 Comment Record ) FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE FET RPD RPM RPX RPS GR ROP $ 3 ) header data for each bit run in separate files. 2 .5000 START DEPTH 2669.5 2669.5 2669.5 2669.5 2669.5 2671.5 2714.5 STOP DEPTH 4873.5 4873.5 4873.5 4873.5 4873.5 4873.5 4876.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RES IS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): 20 -APR- 03 Insite 66.37 Memory 4874.0 2714.0 4874.0 33.2 77.8 TOOL NUMBER 164580 134760 9.875 2704.0 Water Based 8.70 54.0 9.0 400 6.6 1.700 1.300 4.000 2.400 68.0 91.3 68.0 68.0 ) ') EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2669.5 4876.5 3773 4415 2669.5 4876.5 ROP MWD020 FT/H 2.15 3209.38 364.709 4325 2714.5 4876.5 GR MWD020 API 11.03 116.66 64.1286 4405 2671.5 4873.5 RPX MWD020 OHMM 0.48 138.53 16.4264 4409 2669.5 4873.5 RPS MWD020 OHMM 0.53 186.48 17.8946 4409 2669.5 4873.5 RPM MWD020 OHMM 0.61 2000 22.0004 4409 2669.5 4873.5 RPD MWD020 OHMM 0.09 2000 43.6976 4409 2669.5 4873.5 FET MWD020 HOUR 0.07 38.2 1.15261 4409 2669.5 4873.5 First Reading For Entire File......... .2669.5 Last Reading For Entire File...... .... .4876.5 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 ) F i 1 e Type................ LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 File Type................ LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE ROP $ 4 ) header data for each bit run in separate files. 3 .5000 START DEPTH 4877.0 STOP DEPTH 4901.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: 21-APR- 03 Insite 66.37 Memory 4901.0 4874.0 4901.0 .0 .0 TOOL NUMBER 6.750 2704.0 Water Based 8.70 54.0 9.0 400 6.6 .000 .0 .000 .0 ) ) MUD FILTRATE AT MT: MUD CAKE AT MT: .000 .000 .0 .0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value... . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD030 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4877 4901 4889 49 4877 4901 ROP MWD030 FT/H 0.12 149.49 34.4316 49 4877 4901 First Reading For Entire File......... .4877 Last Reading For Entire File.......... .4901 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 ) Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 File Type.. . . . . . . . . . . . . . .LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX GR FET ROP $ 5 ) header data for each bit run in separate files. 4 .5000 START DEPTH 4874.0 4874.0 4874.0 4874.0 4874.0 4874.0 4901.5 STOP DEPTH 6712.0 6712.0 6712.0 6712.0 6705.0 6712.0 6760.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: 22-APR-03 Insite 66.37 Memory 6760.0 4901.0 6760.0 86.7 96.5 TOOL NUMBER 129046 159439 6.125 4886.0 FLO PRO 9.70 53.0 9.1 90000 5.8 .080 .000 .060 71.0 .0 72.0 ') ) MUD CAKE AT MT: .080 74.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4874 6760.5 5817.25 3774 4874 6760.5 ROP MWD040 FT/H 21.08 530.95 197.468 3719 4901.5 6760.5 GR MWD040 API 21.6 104.6 53.2849 3663 4874 6705 RPX MWD040 OHMM 0.61 2000 48.3426 3677 4874 6712 RPS MWD040 OHMM 5.31 2000 190.374 3677 4874 6712 RPM MWD040 OHMM 3.83 2000 237.294 3677 4874 6712 RPD MWD040 OHMM 4.56 2000 243.264 3677 4874 6712 FET MWD040 HOUR 0.21 43.32 1.14839 3677 4874 6712 First Reading For Entire File......... .4874 Last Reading For Entire File.......... .6760.5 ) ) File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/20 Maximum Physical Record. .65535 F i 1 e Type................ LO Next File Name.......... .STSLIB.006 Physical EOF Tape Trailer Service name............ .LISTPE Da te . . . . . . . . . . . . . . . . . . . . . 03/05/20 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Da te. . . . . . . . . . . . . . . . . . . . . 03/05/20 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File