Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout184-125 ~ge Project Well History File' Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. RESCAN DIGITAL DATA OVERSIZED (Scannable) [] Color items: [] Diskettes, No, [] Maps: [3 Grayscale items: [] Other, No/Type [] Other items scann able by large scanner [] Poor Quality Originals: ..~ Other: li~: Logs of various kinds NOTES: [] Other BY; BEVERLY BREN VINCENT SHERYL MARIA LOWELl. DATE: Is/ Project Proofing BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELl. DATE: /SI Scanning Preparation ~ x 30= ! '~'/~- + ~)0 = TOTAL PAGES Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: /~;~ ? PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: '~ YES Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES (Sc^:N:iO is COMPLETEBAETVT:i:Lp~YiNT~.;ELENss ~:ENcC~i~^TTENT~ON iSREQLiMR::'O: ^NL~Dw~,:::L p^GE i~,S~S DATE/~ilI~~s! ~ DUE TO QUALITY, GRAY$CALE OR COLOR IMAGES) ReScanned (individual page [special attention] scanning completed) NO NO F~ESCANNEDBY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /SI General Notes or Comments about this file: Quality Checked (done) 10/25/02Rev3NOTScanned.wpd STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back for Sidetrack 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 184-125 302-240 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 ~ i 50-029-21156-00 4. Location of well at surface ,. ~.'-- ~~. 9. Unit or Lease Name 2314' SNL, 711' EWL, SEC. 35, T12N, R12E, UM !~. '~' ' ~ i' Prudhoe Bay Unit At top of productive interval i!;. ' . - ---.; ~ 4237' SNL, 1442' EWL, SEC. 02, T11N, R12E, UM 10. Well Number At total depth S-18 4462' SNL, 1445' EWL, SEC. 02, T11N, R12E, UM 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool KBE = 75.29' ADL 028260 12. Date Spudded 07/26/1985 i 13' Date T'D' Reached 114' Date C°mp'' Susp'' °r Aband' 08/11/1985 8/9/2002 "" 115' Water depth' if OffshOre N/A MSL II 16' N°' °f C°mpleti°ns Zero 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost 12140 9173 FTI 12098 9147 FTI [] Yes [] NoI N/A MDI 1900' (Approx.) 22. Type Electric or Other Logs Run DIL / SFL / GR, LDT / CNL, Gee Column, BHCS, Cyberlook, CBL, GCT 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED 20" x 30" Insulated Conductor Surface 110' 36" 8 cu yds Concrete 13-3/8" 72# L-80 Surface 3055' 17-1/2" 4265 cu ft Permafrost 9-5/8" 47# L-80 Surface 11650' 12-1/4" 2196 cu ft Class 'G', 230 cu ft 'G' 7" 26# L-80 11376' 12140' 8-1/2" 375 cu ft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None None MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11722 P&A with 17 Bbls Class 'G', Squeezed to 750 psi 10960' Set Bridge Plug with Whipstock on top 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not On Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL O~L GRAVITY-APl (CORR) F~ress. 24-HOUR RATE 28. CORE DATA i'~ I~ ~ ~'~ I:t, I I' !~ Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit c(~r~ ~il:~. ~' ! ¥ E IJ No core samples were taken. ? ~' {~k ~ ~ ~,-.,,,,. ~~C'~'~. - 0CT 0 4 ~00~ Anchorage Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered and Marker Name Depth Depth gravity, GOR, and time of each phase. Sag River 11669' 8861' Shublik C 11814' 8961' Sadlerochit / Zone 4 11844' 8981' RECEIVED OCT 0 4 2002 Alaska 0il & Gas Cons. Co~~ Anchorage 31. List of Attachments: Summary of Pre-Ri9 Work and Daily Drilling Reports 32. I hereby certify that the foreGoinG is true and correct to the best of my knowledge Signed TerrieHubble.~J~~, ~ Title TechnicalAssistant Date /O°O&'O~ S- 18 184-125 302-240 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. /Approval No. Drilling Engineer: Bill Isaac. son, 564-5521 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Well: S-18A Rig Accept: 08/15/02 Field: Prudhoe Bay Unit Rig Spud: 08/23/02 APl' 50-029-21156-01 Rig Release: 09/03/02 Permit: 202-163 Drilling Rig: Doyon 14 PRE-RIG WORK 03/17~02 PPPOT-IC PASSED / CMIT T X IA FAILED (RWO SCREENING). 06/16/02 RAN 2.50" X 8' X 2.50" BARBELL. TAG BOTTOM @ 11380' SLM. RD. SECURED WELL. NOTIFIED DSO OF WELL STATUS. WELL LEFT SHUT-IN. 06/30/02 CMIT T X IA PASSED TO 2500 PSI (SIDETRACK EVAL). 08/06/02 DRIFT TO TOP OF 3-1/2" XX PLUG @ 11382' SLM. PULLED PLUG. STARTED IN WELL W/2.49" CENTRALIZER, EOT LOCATOR & SAMPLE BAILER. 08/07/02 TAG EOT @ 11393' SLM. ELM-11402'. CORRECTION=9'. TAG BO-I-I'OM @ 11877' CORRECTED DEPTH. BOTTOM PERF @ 11899'. 22' OF FILL. NOTHING IN SAMPLE BAILER. RIG DOWN. SECURED WELL. NOTIFIED DSO OF WELL STATUS. 08/08/02 PPPOT-T AND PPPOT-IC PASSED (PRE RWO). CYCLED ALL LDS ON BOTH THE TUBING HEAD AND CASING HEAD AND RE-TORQUE TO PROPER TORQUE. NO SIGNS OF BENT OR BROKEN LDS. THE 9-5/8 HAS A MANDREL STYLE PACKOFF THAT CAN BE PULLED THROUGH THE BOP STACK. 08/09/02 P&A. M/U 2.25" BALL DROP NOZZLE & RIH. TAG AT 11884' CTMD. KILL WELL & R/U CEMENTERS. PUMP 5 BBLS NEAT, 5 BBLS W/15# AGGREGATE & 7 BBLS NEAT, PULL TO SAFETY & SQUEEZE 3 BBLS AWAY, SEE 500 PSI ON WELLHEAD & R/D CEMENTERS. SQUEEZE IN ANOTHER BARREL & SEE WELLHEAD CLIMB TO 750 & HOLD. CONTAMINATE AND JET OUT CEMENT TO 11725' WHILE MAINTAINING 500 PSI WHP AND 1:1 RETURNS. POOH AT 80%. FREEZE PROTECT WELL TO 2500' WITH 50/50 METH. LEAVE WELL SHUT IN WITH 400 WHP. NOTIFY PAD OP OF WELL STATUS. 08/11/02 DRIFT AND TAG CEMENT TOP W/2.58" CENT, TEL, AND SAMPLE BAILER. LOCATED T.T. @ 11375' SLM + 27 = 11402' ELM. DRIFTED DOWN TO TD, TOOLS STOPPED @ 11758' SLM AND FELL TO 11787' SLM + 27 = 11814' CORRECTED DEPTH. RDM©. LEFT WELL SHUT IN. SAMPLE WET CEMENT. NOTIFY DSO OF WELL STATUS. 08/12/02 RIH W/2.5" BALL DROP NOZZLE. TAG HARD AT 11733' CTD. (8' DEEPER THAN TOC WAS LEFT AFTER PLUG JOB, BUT 81' DIFFERENCE FROM S/L TAG.) CALL OUT SLICKLINE TO RETAG. SLICKLINE MAKES (2) RUNS, 1ST RUN SHOWS CEMENT TOP @ 11,765'. SOME CONFUSION ABOUT TUBING TAIL. 2ND RUN VERY DEFINED TUBING TAIL, CEMENT TOP @ 11,722' (CORRECTED TO ELM). R/D HALLIBURTON SLICKLINE. RIH W/COIL & FREEZE PROTECT TO 2500'. S-18A, Pre-Rig Work for Rotary o~detrack Page 2 08/13/02 SHOT 3 STRAND 80 GRAIN STRING SHOT FROM 11307' TO 11317'. RAN A 2 3/8" CHEMICAL CUTTER AND CUT TUBING AT 11315'. CU'I-I'ER MOVED UPHOLE 16' BEFORE BECOMING STUCK. UNABLE TO WORK FREE, PULLED CABLE FREE AT WEAK POINT. TOOLS FISHED BY HAIBURTON SLICKLINE UNIT. 08/14/02 ATTEMPTED TO FISH E-LINE TOOL STRING W/2.6 BELL GUIDE AND 2" UO PULLING TOOL, DID NOT LATCH FISH @ EXPECTED DEPTH @ 11315' ELM. RAN THROUGH AREA SEVERAL TIMES BEFORE RUNNING IN HOLE AND SITTING DOWN @ 11719' SLM (DID NOT LATCH). LEFT WELL SHUT IN. NOTIFIED OPER. CIRCULATE OUT TUBING & IA TO THE FLOWLINE OF WELL S-40. PUMPED 5 BBL NEAT MEOH SPEAR FOLLOWED BY 800 BBLS 1% KCL WATER. BLED TUBING, IA, & OA DOWN TO ZERO. BP EXPLORATION Page 1 ~ Operatio. ns Summary Report Legal Well Name: S-18 Common Well Name: S-18 Spud Date: 7/27/1985 Event Name: REENTER+COMPLETE Start: 8/14/2002 End: 9/3/2002 Contractor Name: DOYON Rig Release: 9/3/2002 Rig Name: DOYON 14 Rig Number: Date Fr°m-To HOUrs Task Code NpT PhaSe Description of Operations : ,._ 8/15/2002 04:00- 05:00 1.00 MOB P PRE Held PJSM. Skidded Rig Floor. 05:00 - 09:30 4.50 MOB P PRE Held PJSM. Moved off of S 215i. Moved in Rig and Spotted over S~18A. Shimmed and Set Rig. 09:30- 10:30 1.00 MOB P PRE Skidded Rig Floor into Position. 10:30 - 11:00 0.50 MOB P PRE Set Cuttings Tank, R / U Rig Floor. Took on Sea Water. Accepted Rig @ 1030 hrs 8 / 15 / 2002 11:00 - 12:00 1.00 WHSUR P DECOMP Held PJSM. N I D Production Tree, Checked Tubing Hanger Threads, Checked XO Make Up in Hanger, OK. : 12:00 - 15:00 3.00 BOPSUF P DECOMP Held PJSM. N / U 13-5/8" x 5,000 psi BOP Stack. Hydril Annular Preventer, Top Pipe Ram w/2-7~8" x 5" Variable Rams, Blind Ram, Lower Pipe Rams w/3-1/2" x 6" Variable Rams. 15:00- 16:00 1.00 BOPSUIq P DECOMP R / U Drill Floor 16:00 - 17:00 1.00 BOPSUR P DECOMP Held PJSM. R / U to Test BOPE Equipment. 17:00 - 20:30 3.50 BOPSUIq P DECOMP Tested BOPE. Tested Upper and Lower Rams, Blind Rams, Stand Pipe Manifold, Choke Manifold, Valves, HCR, Kill Line, Choke Line, Floor Valves and IBOP to 3,500 psi High / 250 psi Low. Tested Annular Preventer to 2,500 psi High / 250 psi Low. iAII Tests Held f/5 Min. All Pressure Tests Held w/No Leaks or Pressure Loss. Witnessing of BOPE test Waived by Chuck Sheeve-AOGCC. 20:30 - 21:30 1.00 BOPSUF P DECOMP R / D BOPE Test Equipment. 21:30 - 22:30 1.00 BOPSUF P DECOMP Held PJSM. R / U DSM Lubricator, Pulled TWC. R / D DSM. 22:30 - 23:00 0.50 PULL P DECOMP Held PJSM. R / U Equipment to Pull Tubing. 23:00 - 23:30 0.50 PULL P DECOMP M / U 1 Joint 4" DP and XO to 4" TDS Threads. RIH and Screwed into Tubing Hanger. Backed Out Lock Down Screws. Pulled on Tubing, Hanger was Free. Pulled Up 5', String Weight 95,000~. 23:30 - 00:00 0.50 PULL P DECOMP Circulated Bottoms Up. Pump Rate 10 bpm, 300 psi. 8/16/2002 00:00 - 01:00 1.00 PULL P DECOMP Held PJSM. Circulated Bottoms Up. Pump Rate 10 bpm, 300 psi, No Gas. R / U Camco Equipment to Spool up Dual Encapsulated Control Line. 01:00 - 01:30 0.50 PULL ~ DECOMP Pulled Tubing Hanger to Floor. Broke out and L / D 4" TDS Thread XO and 4" DP. Broke out and L I D Tubing Hanger. 01:30 - 04:00 2.50 PULL :) DECOMP POOH and L / D 50 Jts 4-1/2" Tubing. Spooled Up Control Line. Broke out and L / D SSSV Assembly. Recovered 26 Clamps as per Tally, Did Not Recover 2 Stainless Steel Bands. 04:00 - 04:30 0.50 PULL P DECOMP R / D Camco Equipment, R / D 4-1/2" Equipment and Cleared Floor. R / U 3-1/2" Handling Equipment. 04:30-12:30 8.00 PULL P DECOMP POOH and L / D 296 Jts of 3-1/2" Tubing.,1 Cut Jt =1.69' and 5 GLM Assemblies. 12:30 - 14:00 1.50 PULL P DECOMP Cleaned Paraffin and Oil from Tubing off of Rig Floor. R / D Tubing Equipment. R / U 4" DP Handling Equipment. 14:00 - 15:00 1.00 BOPSUF P DECOMP Held PJSM. M / U Test Plug and Set in Wellhead. Attempted to Test Lower BOP Rams. Test Plug was not fully seated when RIH. Test Plug Seated under Pressure. Damaged Plug and Lock Down Screws. Pulled Test Plug and Inspected. 15:00 - 15:30 0.50 BOPSUF:P DECOMP Ran and Set Wear Bushing. 15:30 - 18:30 3.00 FISH !P DECOMP Held PJSM. M I U Fishing BHA-8-1/8" Cut Lip Guide - Overshot Extension - Overshot Bowl w/3-1/2" Basket Grapple - XO - Bumper Sub - 6-1/4" Oil Jars - 9 x 6-3/4" D.C. - Accelerator Jars - Pump Out Sub - 15 x 5" HWDP - XO. BHA Length Printed: 9/4/2002 10:51:08 AM BP EXPLORATION Page 2 ~ Operati:ons Summary Report Legal Well Name: S-18 Common Well Name: S-18 Spud Date: 7/27/1985 Event Name: REENTER+COMPLETE Start: 8/14/2002 End: 9~3~2002 Contractor Name: DOYON Rig Release: 9~3~2002 Rig Name: DOYON 14 Rig Number: Date ' From ~To Hours Task Code NPT ' PhaSe DesCription of Operations 8/16/2002 15:30 - 18:30 3.00 FISH P DECOMP 773.92'~ Top of Fish 11,315'. 18:30 - 20:00 1.50 FISH P DECOMP Held PJSM. Cut and Slip Drilling Line. Serviced Top Drive. 20:00 - 00:00 4.00 FISH P DECOMP RIH w/Fishing BHA, P / U and Drifted 4" Drill Pipe. RIH to 5,736' 8/17/2002 00:00 - 04:00 4.00 FISH P DECOMP Held PJSM. RIH w/Fishing BHA, P / U and Drifted Total of 329 Jts 4" Ddll Pipe. RIH to 11,262'. 04:00 - 04:30 0.50 FISH P DECOMP Broke Circulation, Established Circulation Rates: 3 bpm-280 psi, 5 bpm-650 psi, 7 bpm-1,150 psi. Washed Down to 11,290'. Pump Rate 7 bpm, 1,150 psi. Shut Down Pumps and R / U to Reverse Circulate. Closed Annular and Established Reverse Circulation Rates: 4 bpm-350 psi, 6 bpm-700 psi. R I U Little Red Hot Oil Truck. 04:30 - 06:00 1.50 FISH P DECOMP Held PJSM wi Rig Crew, Hot Oil Crew and Truck Drivers. Little Red Pressure Tested Line to 3,000 psi, OK. Pumped 135 bbls 180 deg Diesel Down Annulus, Took Returns up Drill Pipe. Pump Rate 1.95 bpm, 200 psi. 06:00 - 08:00 2.00 FISH P DECOMP Switched over to Rig Pumps. Chased the 135 bbl Hot Diesel w/ 25 bbl Hi-Vis Pill, 300 bb1120 deg Seawater followed with Seawater from pits. Pump Rate 6 bpm, 1,280 psi. Dumped Diesel and 200 bbl Seawater Returns into the Slop Tank. 08:00 - 08:30 0.50 FISH P DECOMP R / D Hose and Circulating Head, Opened Annular. M / U Top Drive and Engaged Pump. Checked Parameters: String Weight Up 260,000/t, String Weight Down 145,000~, String Weight Rotating 175,000~. Pump Rate 3 bpm, 250 psi. Washed Down to the Top of and Swallowed Fish, Pump Pressure Increased to 770 psi. Shut Down Pump and Fully Engaged Fish at 11,308'. 08:30 - 12:00 3.50 FISH 3 DECOMP Attempted to Release K Anchor. Overpulled 15,000# and Rotated Drill String to the Right 22 times. Worked Drill String to get Torque to Fish, Torque 22,000 ft / lbs. No Movement in K Anchor. Backed off 1/2 of the Torque and Jarred on Fish w/ 305,000~ - 350,000~ up Weight. Retorqued Ddll Stdng to 22,000 ft / lbs Worked Torque Down to Fish. Grapples Slipped, No Movement of K Anchor. Reengaged Fish and Obtained 20,000~ Overpull. Torqued Drill String to 24,000 ft I lbs and Worked Torque Down to Fish. No Movement. Backed off Torque to 15,000 ft I lbs, Jarred on Fish w/325,000~ - 350,000~ Up Weight. Retorqued Drill String, No Movement in K Anchor. Grapples Slipped. Reengaged Fish and made Several more attempts as above with No Success. 12:00 - 12:30 0.50 FISH P DECOMP I Held PJSM. Released from Fish, Flow Checked Well, Well Static, Prepared to POOH. 12:30-18:30 6.00 FISH 3 DECOMP POOH w/ 4" DP from11,308' to 774'. 18:30 - 19:30 1.00 FISH ~ DECOMP POOH w/Fishing BHA. Racked HWDP and Drill Collars in Derrick. L / D Jars and Overshot. 19:30 - 20:00 0.50 FISH P DECOMP Cleared and Cleaned Drill Floor. 20:00 - 21:00 1.00 BOPSUF~ ~ DECOMP Held PJSM. R / U Test Plug, RIH and Set in Wellhead. Test Plug Fully Seated. Pressure Tested Lower Pipe Rams to 3,500 psi ~ High / 250 psi - Low. Each Test Held for 5 minutes. Pressure Tests Held w/No Leaks or Pressure Loss. Pulled Test Plug and R / D BOP Test Equipment. Ran and Set Wear Bushing. 21:00 - 22:00 1.00 FISH P DECOMP Held PJSM. M / U Washover Milling BHA. 8-1/2" Burn Shoe - 1 Jt Wash Pipe - Drive Sub - XO - 3 x Boot Baskets - XO - Printed: 914/2002 10:51:08 AM BP EXPLORATION Page 3 ~ OPerations Summa Report :Legal Well Name: 8-18 Common Well Name: S-18 Spud Date: 7/27/1985 Event Name: REENTER+COMPLETE Start: 8/14/2002 End: 9/3/2002 Contractor Name: DOYON Rig Release: 9/3/2002 Rig Name: DOYON 14 Rig Number: Date: From:~To HOurs Task:~C°de NPT Phase Description of Operations 8/17/2002 21:00 - 22:00 1.00 FISH P DECOMP Bumper Sub - 6-1/4" Oil Jars - 9 x 6-3~4" D.C. - 15 x 5" HWDP o XO. BHA Length 800.58'. Top of Fish 11,308'. 22:00 - 00:00 2.00 FISH P DECOMP RIH w/Washover Milling BHA on 4" DP to 2,300' 8/18/2002 00:00 - 03:00 3.00 FISH P DECOMP Held PJSM. RIH w/Washover-Milling BHA on 4" DP to 11,300' 03:00 - 03:30 0.50 FISH P DECOMP M / U Top Drive and Broke Circulation. Established Parameters: String Weight Up 285,000~, String Weight Down 145,000~, String Weight Rotating 192,000~: RPM 60, Torque 12,500 ff / lbs; Pump Rates: 3 bpm-270 psi, 4 bpm-470 psi, 6 bpm-1,000 psi, 8 bpm-1,640 psi, 10 bpm-2,540 psi. Started Mud Lube into System. Washed Down over K Anchor, Tagged Packer at 11,329'. 03:30 - 07:30 4.00 FISH P DECOMP Milled on Packer from 11,329' to 11,333'. WOM 10,000~, RPM 60, Torque 14,000 ft / lbs, Pump Rate 7 bpm, 1,340 psi. Pumped Intermittent 10 bbl Hi-Vis Sweeps. 07:30 - 08:00 0.50 FISH P DECOMP Packer Dropped Down Hole, Chased Packer down to 11,363'. Attempted to Jam Packer inside Wash Pipe. 08:00 - 09:00 1.00 FISH P DECOMP Pumped and Circulated around 25 bbl Hi-Vis Sweep. Pump Rate 10 bpm, 2,400 psi. Slight Show of Gas on Bottoms Up. Flow Checked Well, Well Static. 09:00 - 13:00 4.00 FISH P DECOMP POOH w/4" Drill Pipe to 800'. 13:00 - 15:00 2.00 FISH P DECOMP Held PJSM. POOH Broke out and L / D Milling BHA and Wash Pipe, No Fish. Cleaned out Junk Baskets, Recovered 4-1/2 gallons, 100~ of metal cuttings. 15:00 - 15:30 0.50 FISH P DECOMP Cleared and Cleaned Rig Floor. 15:30 - 16:30 1.00 FISH P DECOMP Held PJSM. M / U Packer Fishing BHA-8-1/8" Cut Lip Guide - Overshot Extension - Overshot Bowl w/3-1/2" Basket Grapple - XO - Bumper Sub - 6-1/4" Oil Jars - 9 x 6-3~4" D.C. - Pump Out Sub - 15 x 5" HWDP - XO. BHA Length 761.14'. Top of Fish 11,343'. 16:30 - 18:00 1.50 FISH P DECOMP Held PJSM. Slipped and Cut Drilling Line. 18:00-21:00 3.00 FISH P DECOMP RIH w/ Fishing BHA on 4" DP to11,320' 21:00 - 21:30 0.50 FISH P DECOMP M / U Top Drive Broke Circulation. Established Parameters: !String Weight Up 250,000~, String Weight Down 160,000~, i String Weight Rotating 192,000g, RPM 65, Torque 7,000 ft / lbs; Pump Rates: 3 bpm-260 psi, 4 bpm-310 psi. Slowed Pump Rate to 3 bpm, 260 psi, Washed Down to the Top of and Swallowed Fish, Pump Pressure Increased to 400 psi. Shut Down Pump and Fully Engaged Fish at 11,350'. Pulled up to Ensure Fish Engaged, Worked Packer through Casing Collars, Drag up 65,000~. 21:30 - 23:00 1.50 FISH P DECOMP Pumped and Circulated around 30 bbl Hi-Vis Sweep. Pump Rate 10 bpm, 2,300 psi. No Gas Observed on Bottoms Up. 23:00 - 00:00 1.00 FISH :) DECOMP POOH w/Fish from 11,343' to 10,400'. Worked Packer through Numerous Casing Collars w/100,000~ Overpull. Drag up 60,000~. 8/19/2002 00:00 - 03:30 3.50 FISH ~ DECOMP Held PJSM. POOH W/4" DP to 700'. Average Drag 10,400' - 9,950' 35,000~. Average Drag 9,950' - 700' 15,000~. 03:30 - 04:00 0.50 FISH P DECOMP Broke Out and L / D BHA. Broke out, L / D Fish. 100% Recovery. Recovered: Cut Jt, Pup Jt and K Anchor, Packer wi Millout Extension, and 3-1/2" Tail Pipe w/Profile Nipples and WLEG. Total Length of Fish 100.04'. 04;00- 04;30 0.50 FISH N DPRB DECOMP Cleaned and Cleared Rig Floor. 04:30 - 05:30 1.00 FISH N DPRB DECOMP Held PJSM. R / U Slickline Unit to Fish Chemical Cutter out of Printed: 914/2002 10:51:08 AM BP EXPLORATION Page 4 ~ Operations Summa Report Legal Well Name: 8-18 Common Well Name: S-18 Spud Date: 7/27/1985 Event Name: REENTER+COMPLETE Start: 8/14/2002 End: 9/3/2002 Contractor Name: DOYON Rig Release: 9/3/2002 Rig Name: DOYON 14 Rig Number: · Date FrOm To Hours Task Code NPT Phase Description of Operations 8/19/2002 04:30 - 05:30 1.00 FISH N DPRB DECOMP Hole. 05:30 - 09:30 4.00 FISH N DPRB DECOMP RIH w/Chemical Cutter Fishing Assembly on Slickline. 1.38" Grapple, 4.40" Bell Guide. Fishing Assembly Stacked Out at 11,453', Made Several Attempts to Work Through with No Success. POOH w/Fishing Assembly. Changed out 4.40" Bell Guide for a 3.80" Bell Guide. RIH w/Chemical Cutter Fishing Assembly. Stacked Out at 11,453', Again Made Several Attempts to Work Through the Obstruction with No Success. POOH w/Slickline. 09:30- 10:00 0.50 FISH N DPRB DECOMP R / D HES Slickline. 10:00 - 11:30 1.50 FISH N DPRB DECOMP Held PJSM. RIH w/6-3/4" Drill Collars and 5" HWDP. Broke Out and L / D Same. 11:30-12:00 0.50 FISH N DPRB DECOMP R/UtoRun4-3/4"BHAEquipment. 12:00 - 14:30 2.50 FISH N DPRB DECOMP Held PJSM. M / U Fishing BHA-5-3/4" Cut Lip Guide - Overshot Extension - Overshot Bowl w/2-1/8" Basket Grapple - Bumper Sub - 4-3/4" Oil Jars - Pump Out Sub - 8 x 4-3/4" D.C. - 16 x 3-1/2" HWDP - XO. BHA Length 747.93'. Top of Fish 11,695'. 14:30 - 17:30 3.00 FISH N DPRB DECOMP RIH w/Fishing BHA on 4" DP to 10,350' 17:30 - 18:30 1.00 FISH N DPRB DECOMP Held PJSM. Cut and Slipped 60' of Drilling Line. 18:30 - 19:00 0.50 FISH N DPRB DECOMP RIH w/Fishing BHA on 4" DP to 11,299'. 19:00 - 19:30 0.50 FISH N DPRB DECOMP M / U Top Drive Broke Circulation. Established Parameters: String Weight Up 230,000~, String Weight Down 150,000~, Stdng Weight Rotating 180,000~, RPM 40, Torque 7,000 ft / lbs; Pump Rates: 6 bpm-950 psi, 7 bpm-1,280 psi. Washed Down from 11,299' to 11,445'. Drill String Torqued up to 15,000 ft / lbs, Set down w/10,000~. Worked Drill String in Attempt to Work Through Obstruction with No Success. Set down with Maximum 20,000~, Drill String Picked up Clean, No overpull. 19:30 - 20:30 1.00 FISH N DPRB DECOMP Lined up to Reverse Circulate the Well. Closed Annular and Broke Circulation. Reverse Circulated, Pump Rate 9 bpm, 2,650 psi. Reverse Circulated 2 x Bottoms Up, Very Slight Show of Gas, Very Slight Show of Scale and Metal Cuttings. 20:30 - 21:30 1.00 FISH N DPRB DECOMP Lined up for Conventional Circulation. Attempted to Wash Down Through Obstruction at 11,445'. Drill String Torqued up to 12,000 ft / lbs, Set down w/30,000~. Drill String Picked Up Clean, No Overpull. Could Not Work Through Obstruction at 11,445'. 21:30 - 22:00 0.50 FISH N DPRB DECOMP Circulated Well, Pump Rate 7 bpm, 1,410 psi. Shut Down Pumps, Flow Checked Well, Well Static. 22:00- 00:00 2.00 FISH N DPRB DECOMP POOH w/4" DP to 5,740'. 8/20/2002 00:00 - 01:30 1.50 FISH N DPRB DECOMP Held PJSM. POOH w/4" DP from 5,740' to 750' 01:30 - 02:30 1.00 FISH N DPRB DECOMP POOH w/BHA to Surface. Lost Cut Lip Guide and Mill Guide Control from Overshot in Hole. 02:30 - 03:30 1.00 FISH N DPRB DECOMP Broke out and L / D Overshot Assembly. ~03:30 - 04:00 0.50 FISH N DPRB DECOMP Evaluated Well operations with Anchorage. Decision Made to Come Up Hole and Set Whipstock in 9-5/8" Casing. 04:00 - 04:30 0.50 BOPSUi~ P DECOMP M / U Retrieving Tool, Latch and Pull Wear Bushing & Set Test Plug. 04:30 - 07:30 3.00 BOPSUI; P DECOMP R / U BOP Test Equipment. Test BOPE to 250 psi Iow / 5 min, 3500 psi high / 5 min. Witness of test waived by AOGCC rep. Chuck Sheave 07:30 - 08:00 0.50 BOPSUI:; P DECOMP R / D Test Equipment. Pu!l Test Plug. Install Wear Bushing. 08:00 - 09:30 1.50 FISH DECOMP RIH w/4.75" DC'c & 3.5" HWDP. POOH L / D same. Printed: 9/4/2002 10:51:08AM BP EXPLORATION Page 5 ~ Operations Summary Report Legal Well Name: S-18 Common Well Name: S-18 Spud Date: 7/27/1985 Event Name: REENTER+COMPLETE Start: 8/14/2002 End: 9/3/2002 Contractor Name: DOYON Rig Release: 9/3/2002 Rig Name: DOYON 14 Rig Number: Date FrOm - To Hours Task Code NPT Phase Description of Operations 8/20/2002 !09:30 - 10:30 1.00 CLEAN P DECOMP M / U BHA #5. Bull Nose, Mill, Scraper, 2 - Boot Baskets, LBS, Oil Jars, 9 - Dc's, 15 - HWDP, & DP. Empty and inspect boot baskets. (No metal or cement recovered) 10:30 - 15:30 5.00 CLEAN P DECOMP TIH w/BH^ #5 on 4.5" DP. Wash Down Last Stand. Tag Liner Top @ 11378'. 15:30 - 16:30 1.00i CLEAN P DECOMP Reverse Circulate @ 402 gpm, 2200 psi. 16:30 - 18:00 1.50 CLEAN P DECOMP Pump sweep around @ 580 gpm, 3900 psi. Flow Check. Pump Dry Job. 18:00- 21:30 3.50 CLEAN P DECOMP POOH. 21:30 - 23:00 1.50 CLEAN P DECOMP Change out handling tools for BHA. Stand back BHA. L / D Scraper & boot baskets. 23:00 - 00:00 1.00 CLEAN P DECOMP R ! U Electric Line unit to run BP. 8/21/2002 00:00 - 01:00 1.00 CLEAN :P DECOMP R / U Electric line unit. 01:00 - 05:00 4.00 CLEAN P DECOMP P,IH w/9 5/8" bridge plug on electric line. Tag top of 7" liner @ 11376'. Run GP, ! CCL correlation log f/11376 ' - 10600'. Tie-in with liner top & previous GR log. Set BP @ 10960'. Pull up 80' TIH tag top of BP. POOH. 05:00 - 05:30 0.50 CLEAN :) DECOMP R ! D Electric line unit. 05:30- 06:00 0.50 CLEAN :) DECOMP Close Blind rams. Test casng & BP to 3500 psi. 06:00 - 08:00 2.00 STWHIP :~ WEXIT Make up whipstock assembly BHA #6: Anchor, Slide, Starting Mill, Lower Mill, Upper Mill, HWDP, Float Sub, MWD / UBHO, LBS, 9 - DC's, 15 - HWDP, & XO. Orient tools. 08:00 - 08:30 0.50 STWHIP P WEXIT Surface test MWD. 08:30 - 14:30 6.00 STWHIP :~ WEXIT TIH with whipstock on 4" DP @ 1.5 min / stand. 14:30 - 15:30 1.00 STWHIP ~ WEXIT Odent Whipstock to 60 deg right. Set Whipstock @ 10960' (btm). Trip anchor. Shear off Whipstock. 15:30 - 17:00 1.50 STWHIP P WEXIT Swap hole to 11.0 ppg LSND mud system @ 454 gpm, 3130 psi. Circulating rates: 300 gpm 1750 psi 400 gpm 2780 psi 450 gpm 3340 psi 500 gpm 3900 psi 17:00 - 00:00 7.00 STWHIP P WEXIT Mill Window in 9 5~8" casing. Top of Window @ 10936'. Bottom of Window @ 10952'. Drill to 10957'. 395 gpm, 2580 psi. 8/22/2002 00:00 - 02:30 2.50 STWHIP P WEXIT Drilling formation f/10957' - 10966'. 395 gpm, 2580 psi. 02:30 - 04:00 1.50 STWHIP P WEXIT Pump sweep around. Circulate and condtion mud for FIT. 400 gpm, 2580 psi. 04:00 - 04:30 0.50 STWHIP P WEXIT FIT. MW = 11.0 ppg, TVD = 8363'. Pressure = 660 psi. EMW = 12.5 ppg. 04:30 - 05:30 1.00 S'I'WHIP P WEXIT Polish up window. 05:30 - 07:30 2.00 STWHIP :) WEXIT Flow check. Pump slug. TOOH. Stand back 56 stands of 4" DP. 07:30 - 12:00 4.50 STWHIP :) WEXIT Continue POOH laying down 4" DP to make room in derrick for 5" DP. 12:00 - 13:00 1.00 STWHIP :) WEXIT LD Whipstock assembly. Clear rig floor. 13:00 - 14:00 1.00 BOPSUI~ P INT1 PU stack washer & wash stack to clear milling debris. LD tool. 14:00 - 18:30 4.50 DRILL C INT1 PU BHA #7: Bit, Mtr, Float sub, Stab, MWD, 2 NM Hang of subs, 3 NM Flex DC's, Jars, XO, 65 Stds 4" DP, XO. Orient mtr, Initialize MWD. Shallow test MWD prior to picking up 4" DP. TIH to 6885'. 18:30 - 21:30 3.001 DP,ILL C INT1 Cut & Slip Drill line. Change out Top Drive saver sub to 5" HT. Chage grabber dies in TD & roughneck. Change out elevators Printed: 914/2002 10:51:08AM BP EXPLORATION Page 6 Operations Summary Report Legal Well Name: S-18 Common Well Name: S-18 Spud Date: 7/27/1985 Event Name: REENTER+COMPLETE Start: 8/14/2002 End: 9~3~2002 Contractor Name: DOYON Rig Release: 9/3/2002 Rig Name: DOYON 14 Rig Number: ~Date From ,To Hours .Task Code NPT ~ PhaSe Description of Operations 8~22~2002 18:30 - 21:30 3.00 DRILL C INT1 and handling tools to 5" DP. 21:00 o 00:00 3.00 DRILL C lINT1 TIH picking up 5" DP from pipe shed. PU total 33 jts and rack back in derrick. Continue TIH. 8000' @ report time. 8~23~2002 00:00 - 03:00 3.00 DRILL C INT1 Continue TIH picking up 5" DP from pipe shed. 03:00 - 04:00 1.00 DRILL C INT1 Break circulation. 460 gpm, 3240 psi. 500 gpm, 3700 psi. Orient tool face to slide through window. Pumps off. MAD pass fl 10880' - 10960' (180 ftJhr). Slight wobble as pass through window. Tag up @ 10960'. 04:00 - 23:00 19.00 DRILL C INT1 Drill directionally f/10966'- 11705'. 500 gpm, 3900 psi, 5 - 10 K WOB. Reduce rate to 470 gpm, 3820 psi on bottom. PU = 230 K, SO wt = 118 K, ROT wt = 118 K. AST: 10.9 hrs,,~T: 2.17Hrs, ADT: 12.26hrs. TQ:8Koffbtm, 12Konbt~, 23:00 - 00:00 1.00 DRILL C INT1 Circulate up sample for Geology. Circulate sweep a~und and hole clean. Some splintering shale in returns. ~' , 18/24/2002 00:00 - 01:00 1.00 DRILL C INT1 Continue to circulate up cutting sample and s.~'ep arou?d_L- Rotate @ 80 rpm and reciprocate drill string"470 gpm, 3600 psi. TQ = 6 K. 01:00 - 01:30 0.50 DRILL C INT1 Wiper trip to 9 5/8" window @ 10~6'. Hole slick. PU wt pumps off = 250 K. // 01:30-02:00 0.50 DRILL C INT1 TIHtobottom@ 11705'.~'fi11. Hole__s?c_k.. 02:00 - 03:00 1.00 DRILL C INT1 Circulate sweep around~. 500 gpm, 3780 psi..TQ =_6 K. _.. 03:00 - 03:30 0.50 DRILL C INT1 Spot Liner pill on b~eck. Pump slug. Drop 2" rabbit. ~ ................ 03:30 - 08:30 5.00 DRILL C INT1 POOH for 7~ & 4" DP. SLM. Flow check @ 9 5~8" c..~'fng window. 08:30 - 10:30 2.00 DRILL C INT1 LD BHA~'~. Clear rig floor. 10:30-12:30 2.00 CASE C INT1 RU L~~~' w..elry.' .F. Ioat. ~ Collar (inserttype in t #3 pin), 20 Jts 7" 26~ L-80 BTC-M Liner. Baker-Lok Shoe iNT~ track. PU wt = 75 K, SO wt = 75 K, Liner wt = 20 K. 12:30 - 13:00 0.50 CASE C RD 7" Liner tools. MU liner hanger. PU 1 stand 4" DP. Circulate liner volume @ 220 gpm, 140 psi. 1NT1 TIH with 7" liner on 61 stands + 20' pup jt of 4" DP. Change 13:00 - 18:00 5.00 CASE C J out handling tools to 5". Continue TIH with 7" liner on 5" DP to 9 5~8" casing window @b 10936'. 18:00 - 18:30 0.50 CASE C j INT1 Circulate Liner volume @ window. 296 gpm, 1220 psi. PU wt -- 225 K, SO wt = 160 K. 18:30 - 19:30 1.00 CASE INT1 Continue TIH with 7" liner to 11675'. 19:30 - 22:00 2.50 CEMT,,'/' C INT1 MU cement head and lines. Break Circulation & wash to bottom. 100 gpm, 600 psi. Stage pumps up to 296 gpm (7 bpm), 1750 psi. Hole packed off. Work pipe, regain  circulation. Set pipe on bottom and stage pumps up to 210 gpm (5 bpm), 1000 psi. RU cementers. PJSM with rig crew and cementers. Batch cement. 22:00 - 23:0,,0,'1.00 CEMT C INT1 Switch to Dowell. Pump 5 bbls 12.5 ppg Mud Push XL. Test  lines to 4000 psi. Pump 20 bbls 12.5 ppg Mud Push XL @ 5 bpm, 850 psi. Mix & pump 42 bbls (152 sxs) 15.8 ppg, 1.53 ft^3 / sx yield, class "G" cement @ 5 bpm, 1050 psi. Drop pump down plug. Pump 5 bbls water. Switch to rig pumps for  displacement. , Pump Displacement @ 5 bpm, 500 psi. Pressue increase as Printed: 9 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Alter Casing [] Change Approved Program [] Suspend [] Repair Well [] Operation Shutdown 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 . Location of well at surface 8'2'f~' SNL, 711' EWL, SEC. 35, T12N, R12E, UM At top of productive interval 4237' SNL, 1442' EWL, SEC. 02, T11N, R12E, UM At effective depth 4429' SNL, 1~.~.' EWL, SEC. 02, T11N, R12E, UM At total depth 4462' SNL, 1445' EWL, SEC. 02, T11N, R12E, UM [] Plugging [] Time Extension [] Perforate [] Pull Tubing [] Variance [] Other ,/" [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 75.29' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number // S-18 9. Permit Number 184-125 /~ 10. APl Number 50- 029-21156-00 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Casing Present well condition summary Total depth: measured 12140 feet Plugs (measured) true vertical 9173 feet Effective depth: measured 12098 feet Junk (measured) 5" Cutter Bar 1-3/4" Fishing Neck at about 11934' ~'' true vertical 9147 feet Length Size Cemented MD TVD Structural Conductor 110' 20" x 30" 8 cu yds Concrete 110' 110' Surface 3055' 13-3/8" 4265 cu ft Permafrost 3055' 2687' Intermediate 11650' 9-5/8" 2426 cu ft Class 'G' 11650' 8848' Production Liner 764' 7" 375 cu ft Class 'G' 11376' - 12140' 8658' - 9173' Perforation depth: measured 11846'- 11860', 11866'-11890' R E C E~v Sqzd: 11890'- 11915', 11925'- 11940' true vertical 8983' - 8992', 8996' - 9012' Sqzd: 9012'- 9029', 9036'- 9045' JUL Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 x 3-1/2", 9.2#, L-80 to 11415' Alaska 0il & L~as Cons. . .Anch0raoe Packers and SSSV (type and measured depth) 9-5/8" Baker 'SB-3' packer at 11336'; 4-1/2" Otis SSSV r~ipp~e at 2004' 13. Attachments [] Description Summary of Proposal [] Detailed Operations Program [] BOP Sketch 14. Estimated date for commencing operatio.,p 115. Status of well classifications as: August 5, 2002 ~ I [] Oil [] Gas [] Suspended 16. If proposal was verbally approved Service Name of approver Date Approved Contact Engineer Name/Number: Bill Isaacson, 564-5521 Prepared By Name/Numbec Terfie Hubble, 564-4628 17. I hereby certify that the foregoiq~ is true and correct to the best of my knowledge Signed Brian Robertson ~-_'_~~/ Title Senior Drilling Engineer Date Conditions of Approval: Notify Commiss,o~,~o representative may. witness I Approval Eel ~~- Plug integrity /~. BOp Test ~. Location clearance __ 7 Mechanical Integrity Test Subsequent form required 10- 0..~-.¢' '~-r.~iL.. Approved by order of the Commission §m~l OommJssJoner Date Form 10-403 Rev. 06/15/88 Camm~f Oe~i~CDfO ~ Submit In 9~ipliCa~e bp To: From: ,Subject: Reference: Winton Aubert - AOGCC Date: July 29, 2002 William Isaacson - BPXA GPB Drilling & Wells S-18A Application for Sundry Approval - P&A for Sidetrack Operations APl # 50-029-21156 Approval is requested for the proposed P&A of PI3U well S-18. Plans are to sidetrack the well as a horizontal producer targeting Zone 4 reserves in the same fault block as the original S-18 completion, and Dccess a large, previously unpenetrated block to the south-west. The sidetrack is currently scheduled for oyon 14 beginning around August 14th. The pre-rig work for this sidetrack is planned to begin as soon as the attached Application for Sundry is approved. See the attached diagrams for details and please call with any questions regarding the planned operations. Pre-Ric~ Work: * Notify the field AOGCC representative with intent to plug and abandon * . 1. Rig up slickline. Pull plug from 'X' nipple in tubing tail at 11,404' MD. Drift tubing and tag top of fill in 7" liner for upcoming CTU P&A. RIH with CTU and perform a cement P&A using 15.8 ppg class 'G' cement with adequate cement volume to fill the 7" liner from the top of fill (estimated at -11,878' MD from most recent slick-line tags) to -I~MD, plus squeeze 5 bbls to the perforatiOns. Estimated cement volume needed is 10.9/' barrels. Use aggregate as required to aid in plugging the perfs (this well was frac'd and has the potential to take cement). Once cement has been la/id in and the desired squeeze obtained, RIH and wash out any excess cement down to -~_[Vll~Circulate the well clean above this point. / NOTE: The upcoming sidetrack is pl~r~r~e~ to exi.t.r~.h,e-~ 7" casing at ~11,695',~"~nd the requirement to wash-out excess cement to ~1~¢7-E5~ i¢ t~ r~move any cement from across the planned whipstock set depth. To meet AOGCC regulations, the top of cement should not extend below 11,746' MD, 100' above the top perf./ 3. Rig up slickline, tag and document top of cement and drift tubing for upcoming tubing cut. 4. Liquid pack both the tubing and 9-5/8" annulus to surface. Test the integrity of the cement plu~q and 9- 5/8" casing by simultaneously pressure testing both the tu~hulus ~o 3000 psi' for 30// minutes. The 31/2" tubing is severely corroded and has known leaks. NOTE: This step should be done prior to the tubing cut to allow additional trouble-shooting if either the cement plug or 9-5/8" casing is leaking. 5. RU E-line. Cut the 3W' L-80 tubing at 11,315' MD using a chemical cutter (all depths referenced to Tubing Summary dated 9-4-89). The specified cut depth is -2' down into the 3W' tubing pup above/, the 'X' nipple at 11,322.8'. This cut will be fished and the type and location of the cut is critical.¢ As specified, the cut will leave approximately 8' of 3-1/2" tubing stub for fishing operations. 6. Displace the well to clean seawater by circulating down tubing through the tubing cut / holes in tubing. Continue to circulate until clean seawater returns to surface. Freeze protect top 2200' MD with diesel. 7. Test the FMC 9-5/8" mandrel packoff and tubing hanger seals to 5000 psi for 30 minutes. S-18 Application for Sundry 8. Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test from below to 1000 psi. Secure well. 9. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. o- pr v, l. Ric~ Operations: 1. MIRU Doyon 14. 2. Circulate out freeze protection and displace well to seawater. Set TWC. 3. Nipple down tree. Nipple up and test BOPE. 4. Pull 4¥2" x 3F2" tubing string from above pre-rig cut. 5. MU overshot for 3Y2" tubing and RIH. Wash over and engage 3Fa" tubing stub. Release 'K' anchor from production packer and POH with remaining tubing down to production packer. 6. MU 9-5/8" packer milling assembly with PRT (packer retrieving tool). RIH and mill 9-5/8" packer until free. Engage fish with PRT (in mill out extension below packer) and POH with remaining packer and tubing tail assembly. 7. MU clean-out BHA with MWD/GR. RIH to top of cement in 7" liner and dress cement as required until firm cement is encountered. Use MWD/GR and existing GR log to tie-in top of cement with desired KOP. POH. 8. PU 7" Baker bottom-trip anchor whipstock assembly. Run a tubing spacer below the whipstock to place the top of whipstock at -11,695'MD when spacer bottoms-out on cement plug. Orient whipstock and set on cement plug. Mill window in 7" liner at _+ 11,695' MD. POOH. 9. MU and RIH with 6-1/8" directional assembly with realtime GR/Res. Kick-off and drill the 6-1/8" production section as per directional plan to an estimated TD of 15,598' MD. 10. Run and cement a 4 ~", 12.6# L-80 bonzai production liner (combination solid and slotted) using an inner-string configuration. Displace well to clean seawater. POOH LD DP. 11. Run 4-1/2", 12.6# 13Cr-80 completion tying into the 4-1/2" liner top. 12. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes. 13. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. 14. Freeze protect the well to -2200' and secure the well. 15. Rig down and move off. Post-Riq Work: 1. MIRU slickline. Pull the ball and rod / RHC plug from 'X' nipple below the production packer. Install gas lift valves. Estimated Pre-rig Start Date: Estimated Spud Date: O8/04/O2 08/14/02 William Isaacson Operations Drilling Engineer 564-5521 S-18 Application for Sundry TREE = 4-1/16" ClW ~WELLHEAD = 13-5/8" McEVOY ACTUATOR = CAMERON KB. ELEV = 75.29' i BF. ELEV = 39.S9' i'P,6~, = 9oo' Max Angle = 52 @ 3400' Datum MD = 11689' Datum TVD -- 8800' SS 4-1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID = 3.958" ITOP OF 3-1/2" TBG Id I 13-3/8" CSG, 72#, L-80, ID = 12.347" Id S-18 Current St&.Js 2004' ' Id4-1/2" OTIS TRVS CP-2 SSSV NIP, ID = 3.813" 2028' 2028' 3055' 2028' J--J4-1/2" x 3-1/2" XO J GAS LIFT MANDRELS DATE JMinimum ID = 0.0" @ 11404' J 3-1/2" XX PLUG J TOP OF 7" LNR J--J 11376' 11415' 11322' 11336' 11382' 11404' 11404' 11415' J 11402' J--~3-1/2" OTIS X NIP, ID= 2.750" J Id9-5/8" x 3-1/2" BAKER SB-3 PKR, ID = 3.99" J J--J3-1/2" OTIS X NiP, ID= 2.750" J N3-1/2" XX PLUG J J-J3-1/2" W/LEGI J 9-5/8" CSG, 47#, L-80, ID= 8.681" Jd 11650' PERFORATE)N SUMMARY REF LOG: BHCS/GR ON 08/11/85 ANGLE AT TOP PEP, F: 47 @ 11846' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/8" 4 11846-11860 O 08~06~96 2-1/8" 4 11866-11890 O 08~06~96 2-7~8" 4 11890-11915 S 09~26~86 2-7~8" 4 11925-11940 S 09~26~86 I H 12098' I J 7" LNR, 26#, L-80 U4S, 0.0383 bpf, ID = 6.276" Jd 12140' J / %Top of fill tagged at 11,878' MD on 2/24/93 11934' J--J5" CUTTERBAR 1-3/4" FISHING NECK J DATE REV BY COMMENTS DATE REV BY COMMENTS 08/16/85 ORIGINAL COMPLETION 03/09/01 SIS-MH CONVERTED TO CANVAS 03/12/01 SIS-MD FINAL 09108/01 RN/'I'P CORRECTIONS ,, PRUDHOE BAY UNIT WELL: S-18 PERMIT No: 84-1250 APl No: 50-029-21156-00 Sec. 35, T12N, T12E BP Exploration (Alas ka) TP, EE = 4-1/16" CIW WELLHEAD = 13-5/8" McEVOY ACTUATOR = CAMERON KB. ELEV = 75.29' BF. ELEV = 39.89' KOP = 9OO' Max Angle = 52 @ 3400' Datum MD = 11689' Datum 'rVD = 8800' SS ., 4-1/2"TBG, 12.6#,L-80,0.0152bpf, ID=3.958" i--~ 2028' S-18 Proposed Pr .-Rig ITOP OF 3-1/2" 'rBG Id 2028' [/'/] I ~-~,~-cs~.~#. ~-~o. ~--~.~,~- I-t ~o~' t-~ 2004' ]d4-1/2" OTIS TRVS CP-2 SSSV NIP, ID = 3.813" 2028' Id4-1/2" x 3'1/2" xO I GAS LIFT MANDRELS DATE Pre-Rig tubing cut at -11,315' MD 11322' Id3-1/2" OTIS X NIP, ID = 2.750" I TOP OF 7" LNR H 11376' 11336' 11382' --t 11404' Id9-5/8" x 3-1/2" BAKER SB-3 PKR, ID = 3.99" 11415' 11650' L 11415' 1-13-1/2" W/LEGI I ~402' H ELMD'I-F LOGGED 07/09/90 I PERFORATION SUMMARY REF LOG: BHCS/GR ON 08/11/85 ANGLEATTOP PERF: 47 @ 11846' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/8" 4 11846-11860 O 08/06/96 2-1/8" 4 11866-11890 O 08~06~96 2-7~8" 4 11890-11915 S 09~26~86 2-7~8" 4 11925-11940 S 09/26/86 Cement P&A plug with top planned at 11,725' MD of fill tagged at 11,878' MD on 2/24/93 11934' J--~5" CUTTER BAR 1-3/4" FISHING NECK I~ I-I 12098' ! 7" LNR, 26#, L-80 U4S, 0.0383 bpf, ID = 6.276" Id 12140' DATE REV BY COMMENTS DATE REV BY COMMENTS 08/16/85 ORIGINAL COMPLETION 03/09/01 SIS-MH CONVERTED TO CANVAS 03/12/01 SIS-MD FINAL 09108101 RN/TP CORRECTIONS 07/23/02 WSI Proposed Pre-Rig Work PRUDHOE BAY UNIT WELL: S-18 PERMIT No: 84-1250 APl No: 50-029-21156-00 Sec. 35, T12N, T12E BP Exploration (Alaska) S-18A Proposed Completion TREE: 4-1/16" - 5M CIW L-80 WELLHEAD: 13 5/8" - 5M McEvoy 4-1/2" 'X' Landing Nipple with 3.813" seal bore. I 2200' Cellar Elevation = 38.49' Base Flange = 39.89' Doyon 14 RKB = 73.89' 13-3/8", 72 #/ft, L-80, BTC ~ 4-1/2" 12.6# 13Cr-80 Vam Ace Tubing with GLM's GAS LIFT MANDRELS ............... MD Size ..... ~':T~" Dv -~- ............. 7F-~ ........ _Valve .T_y~e .. 5 TBD 1-1/2" RP Shear 4 TBD 1-1/2" DV 3 TBD 1-1/2" DV 2 TBD 1-1/2" DV 1 / 1 jt above pkr 1-1/2" DV 7" Liner Top at I 11,3'~6' I 9-5/8", 47 #/ft, L-80, BTC ~ 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 7"x 4-1/2" Baker 'S-3' Production Packer 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 4-1/2" 'X' Landing Nipple with 3.813" seal bore. Two full joints of 4-112" tubing 4-1/2" WireUne Entry Guide spaced-out into 4-1/2" liner tie-back sleeve. I +i-1~,42s' I BAKER 5" x 7" Tie Back Sleeve ZXP Liner Top Packer 'HMC' Hydraulic Liner Hanger Window Milled from Whipstock Top of Window at +/-11,695' MD 4-1/2" 12.6#, L-80: IBT-M Solid liner w/Baker ECP at I +1-13,600' i 4-1/2" 12.6 #/ft, L-80, IBT Slotted Liner 7", 26 #/ft, L-80, IJ4S I !,2'140' I I I Date Rev By Comments PRUDHOE BAY UNIT 07/23/02 WSI Proposed Completion WELL: S-18A APl NO: 50-029-21156-01 , , GPB Drilling & Wells I STATE OF ALASKA A'L~oKA OIL AND GAS CONSERVATION COMMISSioN REPORT OF SUNDRY WELL OPERATIONS Perforate Other X 6. Datum elevation (DF or KB) KBE = 75.29 AMSL feet 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2314'SNL, 711' EWL, SEC. 35, T12N, R12E, UPM At top of productive interval 1044' NSL, 1452' EWL, SEC. 02, T11N, R12E, UPM At effective depth 850'NSL, 1454'EWL, SEC. 02, T11N, R12E, UPM At total depth 817'NSL, 1455'EWL, SEC. 02, T11N, R12E, UPM 5. Type of Well: Development X Exploratory Stratigraphic Service 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-18 (13-02-11-12) PBU 9. Permit number/approval number 84-125/9-144,90-417 10. APl number 50- 029-21156 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12140feet BKB 9171feet 12098feet BKB 9144feet Plugs (measured) Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented 110 20x30 8 c.y. 3020 13 3/8 4265 c.f. 11615 9 5/8 2426 c.f. measured ._ 764 7 11846'-11860', 11866'-11890' 375c. f. Measured depth True vertical depth BKB 145 145 3055 2687 11650 884 7 11376-12140 8656-9171 Sqzd: 11890-11915, 11925-11940 true vertical subsea 8906'- 8937' (two intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 x 3 1/2" L-80 to 11336' with 3 1/2" tai~oipe to 11415' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 11336'; 4 1/2" SSSV at 2004' · ' '~" 13. Stimulation or cement squeeze summary Intervals treated (measured) see attachment Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 190 411 573 1662 460 585 190 931 Tubing Pressure 214 207 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby c. ertify that the foregehtg is true and correct to the best of my knowledge. Si~Ined ~ .-'~,,~.t~, ~ ? "~ O~.'~ TltleSeniorTechnicalAssistantl Form 10-404 Rev 06/15/88 Date SUBMIT IN DUtSL(CATE 3/7/89 WELL S-18(13-02-11-12) Non-RieWorkOver/Stimulation Ap proval#9- 144,90-417 Performed a Tubing Wash (Pre Mud Acid) using the following fluids: 40 bbls 15% DAD ACID. 944G H20 plus 559G 34% HCL plus 6G A250 plus 3G F75N plus 42 lbs L58 plugg 143G A26 plus 25G U74 LAF: 14.4% FE-100 PPG 123 bbls Prod WTR 10 bbls Diesel 6/05/90 fjh 2/10/93 A NRWO CTUWO WSO was performed using the following fluids: 206 bbls Prod WTR to Load Well 5 bbls EW 22 bbls ACID 56 bbls PW(Flush) 10 bbls EFF WTR(Pre-flush) 16 bbls Cement 24 bbls EFF WTR(Spacer) 22 bbls Gel Contaminant 8 bbls PW Flush 317 bbls PW to Rev Out 33 bbls Jet CMT Area Class G Cement: 15.8 PPG Containing, .5% D59, .55% D65, 1% D133, .05 GAL/SK D 135, .05 GAL/SK D47 ACID: 13% HCL Containing, 20% Xylene, .4% A-250, .2% F- 75, .5% W-35, 25#/MGAL L-58 BP EXPLORATION BP Exploration (Alaska) Inc. 900 Ea$[ ~enson ~ou~evar~ RO. Box 196612 Anchorage, Alaska 99519-6612 (90~ 561-5111 DATE: 10/24/91 T~ 82948 BP CASED HOLE FINALS Enclosed is your copy of the materials listed quessions, please contact BP Well Records at below. If you have any (907) 564-4004. · 9~''p' -"'~ 41 · · ~ ~-!4 CL 09/22/91 9047 00-10650 00 CAMCO 5 " ~$-~ W-07/ CCL 10/05/91 .=.i i3950.00-14~i2, u0 ~ ~~/ CL 08/22/91 ~1 12101.00-13175.00 C~CO 5 " q/.~-!! / CCL 09/25/91 ~! 9070.00- 9621.00 C~CO 5 " ,~_ ~ Y-04~- CCL 10/0!/91 ~! 8869.00-10162.00 C~MCO 5 " ~/.~P-10~ CCL 09/25/91 %1 8780.00- 9331.00 C~CO 5 " ~'/ W-0a:~/ CCL 0~/21/9i %~ 14200 00-14987 00 C~MCO 5 " t~/~S-!8~' GAS LiFT SU~'~Y 08/30/91 ~1 1800.00- 4550.00 C~CO 2/5" ~-~Y-16~ PROD-F . 10/04/91 ~1 ~ 9000.00- 9405.00 ~CO 5 " .--.~._~ ....... ~-;~ A-!6 INJ 09/01/91 %1 10470.00-10900.00 C~CO 5 " ~-~7 E-13~ PROD-F 09t24/9i ~i 10900.00-11290.00 C~MCO 5 " ./~'15/~ S-07' : :.. '~GAs. LIFT. S~Y ':'~9-/22'/'9I t':fl '/~-/~ "'375':.00-11191'-;00 "~0 '. %'2/5" ..... ~t-~6~ X-17~ TE~ 10/05/91 ~1 8800.00- 9812.00 C~CO 5 " ?~-~[ Y-01~-~ LE~ DET 09/29/91 ~1 7400.00- 7600.00 C~CO 5 " ~';~S-2~ /' PITS 09/22/91 ~1 9100.00- 9547.00 C~CO 5 ~/-~q Y-23 / ~ DET 10/04/91 ~1 '9770.00-10150.00 C~CO 5 " / . .... :~ R-04-- GAS LIFT SURLY 09/26/91 ~1 100 00- 8550 00 C~CO 2 " ~-~5 Z-01~- LE~ DET 09/27/91 ~1 170.00-11350.00 C~CO 2 91,j~Y-3~~ SPI~ER 10/02/91 ~1 9000.00- 9230.00 C~CO 5 " ~ /' 90.~]~y-~9 ~ SPI~ER 10/03/91 ~1 12500.00-13125.00 C~CO 5 " ~,,~¢U-03~/ INJ 09/30/91 ~1 9150.00- 9520.00 C~CO 5 " ,~ - 9050 00- 9385 O0 C~CO 5 " ~-,~ U-05~'~ INJ 10/01/91 ~1 . - 3 ~U-I~'~ INJ 10/07/91 ~1 9650.00-10078.00 C~CO 5 " ~'~X-!I~ iNJ 10/06/91 ~i 9050.00- 9400.00 C~CO 5 " 10/07/91 ~1 8300.00- 9116.00 C~CO 5 " M-21~ TE~ , - X-24- iNJ 10/06/91 ~I ~=u ...... ~ ......... . ~ aaS0 00- 973~ O0 CA=MCO 5 " -~ R-27 PETS 09/27/9= '~ X-06- -NJ 09/28/91 =l !2000.00-!26~0.00 C~2dC 0 5 " j~--~ ~ U-09 - iNJ 10/01/91 =! 10750.00-11297.00 CA~CO 5 " ,-~-~; ,~_n~ ~ ~0/02/91 ~2 8996.00-11779.00 C~MCO 5 " - ~ j-IL LO/O3/9L ~L ~ · . ~.:~ ~ LE~ DET 93~0 00- 9650 00 C~CO 5 ?~-f~ F-03 ~ JE~LRY 08/30/91 91 10800.00-11150.-0~,~CO 5 " .... GAS =Nmov jEWELRY 12/06/ai F! !0039.00-i 0~9. ~ ~'~' W-~: /EWELP. Y ~ 5/91 ~! io o,~ .0 5 " GAS ENTRY SURVEY JEWELRY LCG 15'06/91 #! 900'--. 0-10143. O0 CA=MCO 9300.00- 9800.00 C~MCO information Control Well Records Adrian J. Martin BP EXPLORATION BP Exl31oration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION D ate :09~07~90 T#:81644 FROM' SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedai listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. V" S-18 Collar 07/09/90 #1 11150-11965 HLS 5" ~ Y-09 Perf 08/04/90 #- 10180-10765 HLS 5" I~/Y-09 Temp 08/04/90 #- 9389-10621 HLS 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED S E P '1 3 1990 Alaska 0il & Gas Cons. Com~SS[O[~ Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anct~orage. AlasKa 99519-6612 (907) 561-5111 TO' DISTRIBUTION Date :07~31/90 T#:81450 FROM: Information ContrOl Well Records LR2-1 SUBJECT: BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-d~.~.5. ~/~/I-07 Perf 07/02/90 #1 9500-9850 HLS 5" ~,'S-18 Perf 07/09/90 #1 11150-11965 HLS 5" v,S-18 Perf 07/10/90 #1 11600-11820 HLS 5" v,' S-21 Per/ - 06/30/90 #1 9600-10358 HLS v" W-29 Tubing Jewerly 07/16/90 #1 10400-10820 HLS 5" v" Y-27 Perf 06/29/90 #1 13000-13415 HLS 5" V~' Z-08 Perf 06/27/90 #1 '10585-11576 HLS 5" Distribution: /~C~/ ARCO VL~'D CHEVRON AU~' 3 0 ' ' ~. GEOSCIENCES . . . '~ uas Co~ ,;~~-~;_ .... ~_._ MOBILpHi~iPS ~O~0~*;' b0~~0" ' - -. ... ARCHIVES - ~ STATE OF ALASKA '~ iLASKA OIL AND GAS CONSERVATION CON ..... SSION ~ ~ APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend Operation Shutdown ~ Re-enter suspended well Alter casing Repair wail Plugging . Time extension Stimulate x Change approved program ~ Pull tubing - Variance Perforate oth~ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2314' SNL, 711' EWL, SEC. 35, T12N, R12E, UPM At top of productive interval 1044'NSL, 1452'EWL, SEC. 02, T11N, R12E, UPM At effective depth 5. Type of Well: Development .x Exploratory Stratigraphic Service RECEIVED MAY 1990 850' NSL, 1454' EWL, SEC. 02, T11N, R12E, UPM ~as~(a 0il & Gas Cons. CommissiOtl At total depth 817' NSL, 1455' EWL, SEC. 02, T11N, R12E, UPM 12. Present well condition summary Total depth: measured 12140 feet Plugs (measured) true vertical BKB 9171 feet Effective depth: measured 12098 feet Junk (measured) true vertical BKB 9144 feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 6. Datum elevation (DF or KB) KBE = 75.29 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-18 (13-02-11-12) PBU .. measured 9. Permit number 84-125 ~10. APl number 50- 029-21156 11. Field/Pool ~ Prudhoe Oil Pool Length Size Cemented Measured depth True vertical depth . - BKB 110 20x30 8 c.y. 145 145 3020 13 3/8 4265 c.f. 3055 2687 11615 9 5/8 2426 c.f. 11650 8847 11376-12140 .. 764 7 375 c.f. 11846'-11860', 11866'-11915', 11925'-11940' 8656-9171 true vertical subsea 8906'- 8970 (three intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 x 3 1/2"L-80 to 11336' with 3 1/2" tailpipe to 11415' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 11336'; 4 1/2" SSSV at 2004' 13. Attachments Description summary of proposal × Detailed operations program, BOP sketch X 14. Estimated date for commencing operation MA Y/JUNE 1990 16. if proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Gas Suspended Service Sic)ned ~ ~,/,,/.~-~Z~~ Title Supervisor Waterflood/Miscible Flood FOR COMMISSION USE ONLY Conditions of approval: Notify commission so representative may witness Plug integrity BOP Test~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- T~¢~(_/ I Approva, Approved by order of the Commission ORIGINAL Si~NED BY LONNIE C; SMITH Commissioner Form 10-403 Rev 06/15/88 Approved Copy Returned / STATE SUNDRY NOTICE WELL S-18 Well S-18 requires a cement squeeze WSO, to be followed by a hydraulic fracture of the ivishak, as follows: A. S. 1 3. 4. 5. 6. . 8, 9. 10. CTUWSO: 1. MIRU coiled tubing unit. Acid wash the. perforations ~ Liquid pack the well and cool the reservoir Cement squeeze all perforations up to 3000 psi differential Reverse out after holding squeeze for 30 to 40 minutes. Reverse in Nitrogen to underbalance well for perforating and inflow test Leave well with 1000 psi positive differential at perforations for WOC period Inflow test Resqueeze if it fails inflows If no inflow is observed, reperforate as follows (Ref 08/11/85 BHCS): 11846'-11860' 11866-11890' I · HYDRAULIC FRACTURE TREATMENT: Rig up fracturing equipment and pressure test. Perform a calibration frac. Fracture as follows: PROPPANT STAGE VOLUME PPG TYPE LBS Pad 60 0 1 3.2 1 16/20 CL 3200 2 2.8 3 16/20 CL 8400 3 2.4 5 16/20CL 12000 4 1.5 7 16/20CL 10500 5 0.3 9 16/20CL 2700 6 3.2 10 16/20CL 32000 FLUSH 5.4 0 BPM 35 35 35 35 35 35 35 35 4 5 Leave well shut in overnight. Clean-out any frac sand in wellbore, return well to production BOP STACK F KILL LINE CONNECTION iNJECTOR HEAD PAC~( QUICK UNION _~'--- BLIND SHEARS EILJND SHEARS WHP SENSOR PIPE SLJPS PIPE"RAMS FLANGED CONNECT/ON SWAB VALVE TYPICAL CTU STACK FORM 1481 5/10/89 BP EXPLORATION RECEIVED . /~.~_-- 1990 Alask8 u~i ~, ~' .. -,,,;is.- BP Exploration (Alaska) Inc.. 900 East Elenson 8oulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO:. DISTRIBUTION Date :05/03/90 T#:81093 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. K-08 TDT-P 04/26/90 K-11 TDT-P 04/28/90 M-07 Perf 04/25/90 Sz18 Prod-F 04/27/90 X-27 Prod-F 04/25/90 # 1 10250-10856 #2 11100-1'1587 # 1 9450-9850 # I 11700-12069 # 1 10400-11620 Sch 5" Sch 5" Sch 5" Sch 5" Sch- 5" Distribution: · CIqEVRON GEOSCIENCES MOBIL PHILLIPS ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 November 17, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attention' Mr. C. V. Chatterton Well S-18 (13-02-11-12) PBU Gentlemen: Enclosed, in duplicate, is form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of pulling tubing in the well. Yours very truly, R.V. Schock Workover/Completions Supervisor RVS/KTH Enclosures (2) cc: J. Martin (MB 9-4) Prudhoe Production Engineers Mark Grindle (MB 5-3) Well Records w/10 Well File RECEIVED .NOV 2 .... , gnchore~o STATE OF ALASKA ALA,, .~ OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATII I ¢ I N A [ 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing X Alter casing Repair well Perforate Other 2. Name of Operator BP Exploration 3. Address Po O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2314'SNL, 711'EWL, SEC. 35, T12N, R12E, UPM At top of productive interval 1044' NSL, 1452' EWL, SEC. 02, T11N, R12E, UPM At effective depth 850' NSL, 1455' EWL, SEC. 02, T11N, R12E, UPM At total depth 817' NSL, 1455' EWL, SEC. 02, T11N, R12E, UPM 12. Present well condition summary Total depth: measured true vertical BKB Effective depth: measured true vertical BKB 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE- 75.29 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S- 18 (13-02-11-12) PBU 9. Permit number/approval number 84-125/9-709 10. APl number 50- 029-21156 11. Field/Pool Prudhoe Oil Pool 12140 feet Plugs (measured) 9171 feet 12098 feet Junk (measured) 9144 feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth .. 1 I0' 20" x 30" 8 cu yds 145' 3020' - 13-3/8" 4265 cuft 3055' 11615' 9-5/8" 2426 cu ft 11650' measured .. 764' 7" 375 cu fl 11376'- 12140' 11846'- 11860'; 11866'- 11915'; 11925'- 11940' (all open intervals) True vertical depth BKB 145' 2687' 8847' 8656' - 9171' true vertical (subsea) 8906'- 8969' (three intervals) Tubing (size. grade, and measured depth) 3-1/2"L-80 to 11336' with 3-1/2" tallpipe to 11416' Packers and SSSV (type and measured depth) 9-5/8" Baker packer at 11336'; 4-1/2" SSSV at 2004 13. Stimulation or cement squeeze summary 14. Intervals treated (measured) Treatment description including volumes used and final pressure Representative Daily Average Production or In!ection Data Prior to well operation 12 hr test Subsequent to operation 12 hr test OiI-Bbl Gas-Md Water-Bbl Casing Pressure 140 351 367 1467 psig 220 469 562 1644 psig Tubing Pressure 224 psig 207 psig 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations x 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the f,~regoing is true an/dco~ to the best of my knowledge. Sicjned .,,~.{//~,:.~.~ ''~'////~4~'~'-' Title CompletionEn~ineefin~Supervisor Form 10-4D4 R~V 06/15/88 ~ SUBMIT IN DUPLICATE ATTACHMENT I S-18 WORKOVER PROCEDURE Procedure Outline: , . . . . 10. 11. 12. 13. 14. 15. 16. 17. 18. MIRU workover rig. Accepted rig @2400 hrs 8-27-89. Pulled BPV. Circulated diesel from well. Installed two-way check valve. ND tree. NU and tested BOP's to 5000 psi. Pulled 4-1/2" tubing. Recovered 4-1/2" tubing and SBR. RIH w/overshot. Replaced the 9-5/8" packoff. Recovered the slick stick. RIH mill and recovered the 9-5/8" TIW packer and tailpipe assembly. RIH with 7" test packer. Tested 9-5/8" casing & 7" liner lap to 3000 psi. RIH with 9-5/8" casing scraper to 11,390'. Reverse circulated. Tested casing and lap to 3000 psi - ok. RIH 8.5" gauge ring/junk basket. RIH with 6" bit and 7" scraper to 11,895'. Reverse circulated to inhibited brine. RIH with 4-1/2" X 3-1/2" tubing with GLM's and 3-1/2" tailpipe. Set two-way check valve. ND BOP's. NU & test existing 4"-5M tree to 5000 psi. Pulled two-way check valve & set plug in tailpipe. Set 9-5/8" permanent packer. Tested tubing X casing annulus to 2500 psi. Displaced annulus to 135 bbls diesel and U-tube diesel to tubing. Set BPV. Released rig @1200 hrs 9-6-89. BP EXPLORATION Daily Drilling Report-- PBU -- Workover August 28, 1989 at 0600 hrs Rig: NABORS 1ES AFE # 160502 AFE Amount: (Expense) Well: S-18 (13-02-11-13) AFE # 120958 (Capital) AFE Amount: Current Amount: ~ -. 0600 Depth: Day: 0 Current Operation: Nipple up BOP's. Accepted rig 2400 hrs. on 8-27-89. MIRU rig. Pulled BPV. Changed well over to brine. Installed two-way check valve. ND tree. Wells Shut-In for Drill-By: BP EXiq.ORN'K)N Daily Drilling Report-- pBu-- Workover August 29, 1989 at 0600 hrs Rig: NABORS 1ES Welh S-18 (13-02-11-13) AFE # 160502 AFE Amount: (Expense) AFE # 120958 AFE Amount: (Capital) - Current Amount: 0600 Depth: Day: 1 Current Operation: Change rams. NU and test BOP's. Attempt to pull 4-1/2" tubing. Cut 4-1/2" tubing, at 9856' WLM. Pull 4-1/2" tubing. Change rams to 3-1/2". Wells Shut-In for Drill-By: BP EXPLOFI,~IQN Daily Drilling Report-- PBU -- Workover August 30, 1989 at 0600 hrs Rig: NABORS 1ES Well: S-18 (13-02-11-13) AFE # 160502 (Expense) AFE Amount: AFE 4/ 120958 AFE Amount: (Capital) Current Amount: 0600 Depth: 12098' Day: 2 Current Operation: Lay down 4-1/2" tubing. RIH with overshot and engage fish at 9856'. lar on tubing and attempt to release 'K' anchor. Make blind back off. Lay down overshot and 4-1/2" tubing. Wells Shut-In for Drill-By: BP EXPLORKrlON Daily Drilling Report -- PBU -- Workover August 31, 1989 at 0600 hfs Rig: NABORS 1ES Well: S-18 (13-02-11-13) AFE # 160502 (Expense) AFE Amount: AFE # 120958 AFE Amount: (Capital) - Current Amount: 0600 Depth: 12098' Day: 3 Current Operation: Trip out of hole. Lay down 4-1/2" robing. IH with overshot. Recover 4-1/2" tubing and SBR. RII-~, with overshot. Attempted to release slick stick. No success. POH. Wells Shut-In for Drill-By: BP EXPLORKIION Daily Drilling Report-- PBU-- Workover September 1, 1989 at 0600 hrs Rig: NABORS 1ES Well: S-18 (13-02-11-13) AFE # 160502 (Expense) AFE Amount: AFE # 120958 AFE Amount: (Capital) Current Amount: Current Operation: 0600 Depth: 12098' Day: 4 Trip out of hole. Replace and test 9-5/8" packoff to 5000 psi - OK. Mill and washover 9-5/8" packer from ll314'DPM to ll316'DPM. POH. ,. Wells Shut-In for Drill-By: BP EXPLORKI'iON Rig: NABORS 1ES Well: S-18 (13-02-11-13) Daily Drilling Report -- PBU -- Workover September 5, 1989 at 0600 hrs AFE # 160502 (Expense) AFE Amount: AFE # 120958 AFE Amount: (Capital) - Current Amount: 0600 Depth: 12098' Day: 8 Current Operation: Setting plug in tailpipe. Recover packer tailpipe assembly. Ran 9-5/8" casing scraper to 11390'. Reverse circulate. Test casing and lap to 3000 psi - OK. Ran 8.5 gauge ring junk basket. Ran 7" casing scraper 11985'. Reverse circulate. POH. Change rams to 4-1/2". Ran and landed tubing..ND BOP. NU and test trio to 5000 psi. Pull dummy BV. Set plug in tailpipe~ Wells Shut-In for Drill-By: BP EXPLOR~N Daily Drilling Report-- PBU -- Workover September 6, 1989 at 0600 hrs Rig: NABORS 1ES Well: S-18 (13-02-11-13) AFE # 160502 (Expense) AFE # 120958 (Capital) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 12098' Day: 11 Current Operation: Rig released. Set plug in tailpipe. Set packer. Test annulus to 2500 psi. - OK. Shear valve in glm @ 2900 psi. Pump 135 bbl diesel into annulus and "U" robe to the tubing. Set BPV. Release rig 1200 hrs. Wells Shut-In for Drill-By: BP E~PLORATION BP ExploraUon (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 09/05/89 Transmittal: 80329 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. C-36 TDT-P 08/29/89 91 9600-9901 SCH 5' S-18 TUBING CUTTER 08/28/89 ~1 9712-9868 SCH 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS RESERUC~tR---------- > LASKA ~--------- ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 08/24/89 Transmittal: 80299 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907)564-4445. B-23 Completion 08/18/89 91 9698-9924 Sch 5" R-16 PROD-F 08/19/89 92 11150-11650 Sch S-18 Tubing Puncher 08/11/89 91 3050-11632 Camco ' Distribution: ARCO CHEVRON EXXON GEOSCIENCES EOUSTON MOBIL PHILLIPS OF ALASKA~ ARC~IVES BP EXPLORATION OR IG IN/ BP Exploration (Alaska) Inc. 900 East Benson Boulevard Re. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 14, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attention' Mr. C. V. Chatterton/Mike Minder Well S-18 (13-02-11-12) PBU Gentlemen' Enclosed, in triplicate, is form 10-403, Application for Sundry Approvals, for the above-named well. This information contains our proposal to pull tubing. Yours very truly, Workover/Completions Supervisor RVS/KTH Enclosures cc' J. Martin (MB 9-4) Floyd Hernandez Well File STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISt~...,N APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well~ Alter casing __ Repair well __ Plugging __ Time extension __ Stimulate __ Change approved program __ Pull tubing X Variance__ Perforate Other 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2314' SNL, 711' EWL, SEC. 35, T12N, R12E, UPM At top of productive interval 1044' NSL, 1452' EWL, SEC. 02, T11N, R12E, UPM At effective depth 850' NSL, 1455' EWL, SEC. 02, T11N, R12E, UPM At total depth 817'NSL, 1455'EWL, SEC. 02, T11N, R12E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12140 feet BKB 9171 feet 12098 feet BKB 9144 feet 5. Type of Well: Development X Exploratory __ Stratigraphic__ Service . Datum elevation (DF or KB) KBE - 75.29 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-18 (13-02-11-12) PBU 9. Permit number 84-125 10. APl number 50- 029-21156 11. Field/Pool Prudhoe Oil Pool Casing Length Size Structural -- Conductor 110' 20" x 30" Surface 3020' 13-3/8" Intermediate 11615' 9-5/8" Production -- Liner 764' 7" Perforation depth: Plugs (measured) Junk (measured) Cemented Measured depth True vertical depth BKB 145' 145' 3O55' 2687' 11650' 8847' 8 cu yds 4265 cu ft 2426 cu fl 375 cu ft 11376'- 12140' 8656'- 9171' measured 11846'- 11860'; 11866'- 11915'; 11925'- 11940' true vertical (subsea) 8906' - 8969' (three intervals) Tubing (size, grade, and measured depth) 4-1/2"L-80 to 11297' with 4-1/2" tailpipe to 11411' Packers and SSSV (type and measured depth) 9-5/8" TlW packer at 11297'; 4-1/2" SSSV at 2142' 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X 14. Estimated date for commencing operation 3rd Quarter 1989 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Gas Suspended~ Service 17. I hereby certify that the foregoin~is true and correct to the best of my knowledge. Signed ~ ~~/ Title Completion Engineering Supervisor ,,,,/ FOR COMMISSION USE ONLY Conditions of appro,~al: Notify Commission so representative may witness Plug integrity BOP Test__ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- 'fO'/ Original Signed By Approved by order of the Commission David W. Johnston I Approval No. ~::~ /kporoved COpY Returned ~ Co~ Date Form10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE ATTACHMENT I S-18 WORKOVER PROCEDURE OUTLINE Procedure Outline: 1. MIRU workover rig. 2. Pull BPV. Circulate diesel from well. Install two-way check valve. 3. ND tree. NU and test BOP's to 5000 psi. 4. Pull 4-1/2" tubing. 5. Replace the 9-5/8" packoff. 6. Recover the slick stick. 7. RIH mill and recover the 9-5/8" TIW packer and tailpipe assembly. 8. RIH with 7" test packer. Test 9-5/8" casing & 7" liner lap to 3000 psi. 9. RIH with 9-5/8" casing scraper to 11,376'. Reverse circulate. 10. RIH with 6" bit and 7" scraper to 12,098'. Reverse circulate to inhibited brine. 11. RIH 8.5" gauge ring/junk basket to 11,376'. 12. RIH with 4-1/2" X 3-1/2" tubing with GLM's and 3-1/2" tailpipe. 13. Set two-way check valve. 14. ND BOP's. NU & test existing 4"-5M tree to 5000 psi. 15. Pull two-way check valve & set plug in tailpipe. 16. Set 9-5/8" permanent packer. Test tubing X casing annulus to 2500 psi. 17. Displace annulus to 135 bbls diesel and U-tube diesel to tubing. 18. Set BPV. Release rig. WORKOVER B.O.P. STACK CONFIGURATION 13-5:/8 IN. TRIPLE RAM STACK $000 PSi WP ATTACHMENT II . _ DRILLING ! ANNULAR PREVENTER I I I I PIPE RAHS I I I PIPE RAMs I I 2 IN. KILL LINE ' GATE GATE I BLIND RAMS' I I 4 IN. CHOKE LINE DRILLING J SPOOL ~~ ' GATE GATE BP EXPLORATION HOUSTON ARCO CHEVRON EXXON TEXACO TO: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR REFERENCE: ARC]lIVES ,, BP*CASED HOLE FINAL LOGS BP Exploration (Alaska) Inc.. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Date: 04-27-89 80013 The following material [s being submi'M'ed herewith. Please acknowledge receipt by signing a copy of This le't'ter and returning it to this office: A-Iii C-35 H-22 S-18 W-34 X-05 Z-25 CCL/GR 04-15-89 #1 8850--10604 Camco 5" TEMP 04-12-89 _#1 2950-9638 ~Camco 5" FM/T~MP 04-22-89 #1 SURF ---9600 camco 5" CCL 04-16'89 #1 11100-11990 Camco 5" PITS 04-11-89 #1 10350-10786 Camco , 5" TEMP/GLS 04-15-89 #1 55-9500 Camco 2"/5" CCL 04-16-89 #1 10500-11600 Camco 5" Rece i ved Date Anchorage Shirley R. McCurry I NFORMAT I ON CONTROL .. Well Records LR2-1 BP EXPLORATION HOUSTON ARCO CHEVRON F~XON Date: - TEXACO 'TO: T~: MOBIL PHILLIPS ~TATE OF ALASKA ' ARCHIVES INDEXED BP ~xplora~ion (^l~kal Inc. gOO East Benin Boulevan~ RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 04-26-89 80011 BP F~NAL DATA - PRESSURE SURVEY DATA The following material Is being submltffed herewith. Please acknowledge receipt by signing a copy of this .lei~rer and refurnlng It to this office: B-23 S~atic Gradient - '04-20-89 Camco D-17 Static Gradient 04-18-89 Camco D-26 Static Gradient 04-22?89 Camco E-03 Static Gradient 04-16-89 Camco F-11 Static Gradient 04-20-89 Camco H-24 Flowing Gradient 04-19-89 Camco K-05 Static Gradient 04-18-89 Camco M-17 Static. Gradient 04-20-89 Camco S-18 ' Static Gradient 04-16-89 Camco X~I 9 Static Gradient 04-20-89 Camco Z-25 Static Gradient 04-16-89 Camco Z-31 Static Gradient 04-21-89 Camco Received Date Alask-~ Oil & Anchorage Shirley R. McCurry I NFORMAT 1 ON CONI~ROL We i I Records LR2- ! BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O, Box 196612 Anchorage, Alaska 99519-6612 (9O7) 561-5111 TO HOUSTON ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES Date: 04/17/89 T~: 79969 BP CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: C-23 Prod-F 03/25/89 ~1 9800-10170 Camco 5" D-04A PITS 03/22/89 91 10300-10600 Camco 5' E-14 Prod-F 03/31/89 ~1 11400-11680 Camco H-02 CCL/GR 03/15/89 91 7600-9100 Camco 5" M-06 Spin Temp 03/27/89 ~1 2500-11248 Camco M-29 Inj-F 03/18/89 91 9450-10210 Camco 5" S-18 Leak Der 03/17/89 91 50-11550 Camco 2"/5' W-17 CNL-GR 04/11/89 ~1 11350-11850 Sch 5' X-26 Inj-F 03/17/89 91 9200-9530 Camco Z-31 Prod-F 03/16/89 91 12900-13196 Camco Received: Date: Alaska uiJ & C-as Con=. CommJssior~ Anchorage Information Control Well Records LR2-1 J. Dietz/S. McCurry BP EXPLORATION HOUSTON ARCO CEEVAON TEZA~O TO: MOBIL REFERENCE:: PHILLIPS STATE OF ALASI~ GEOSCIENCES RESERVOIR ARC]tirES '- BP'CASED HOLE FINAL LOGS BP Exl~lomti0n (Alaska) Inc. g00 East Benson Boulevard P.O. Box 196612 Anchotage,-Alaska 99519-6612 (907) 561-5111 Date: 03-17-89 79890 TI: The following material ls being subml~ed herewith. Please acknowledge receip? by signing a copy of this It"tier and returning It to this office: F-15 GC-2C M-14i S-18 U-9i W-31 W-36 W-31 X-15 CCL; 03-13-89 #1 9268-9635 At las 5" PERF 03-09-89 #1 4620-5100 Sch 5" COMP 03-12-89 #1 10200-10745 Sch 5" PROD 03-14-89 #1 11900-11500 Atlas 5" COMP 03-13-89 #1 10515-11100 Sch 5:' 4-ARM 03-11-89 #1 10780-11900 Atlas 5" CNL 03-09-89 #1 9150-9725 Sch 5" CCL 03-11-89 -#1 10850-11730 Atlas 5" COMP 03-10-89 #1 9342-9700 Sch 5" Rece i ved Da$e Shirley R. McCurry I NFORJ4AT ! ON CONTROL We I I Records LR2-:I BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 February 21, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well S-18 (13-02-11-12) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, J A Bragg ~ ~~j~~~A~er Production Engineering JAB:JAM Enclosures (9) cc: L. Burke (MB12-1) Well File STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon__ Suspend Alter casing __ Repair well Change approved program __ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2314' SNL, 711° EWL, SEC. 35, T12N, R12E, UPM At top of productive interval 1044' NSL, 1452'EWL, SEC. 02, T11N, R12E, UPM At effective depth 850' NSL, 1454' EWL, SEC. 02, T11N, R12E, UPM At total depth 817'NSL, 1455'EWL, SEC. 02, T11N, R12E, UPM 12. Present well condition summary Total depth: measured true vertical BKB Effective depth: measured true vertical BKB operation Shutdown __ Re-enter suspended well__ Time extension ~ Perforate 6. Plugging __ Pull tubing __ Variance __ 5. Type of Well: Development x Exploratory .__ Sl~atigraphic__ Service 12140 feet Plugs (measured) 9171 feet 12098 feet Junk (measured) 9144 feet stimulate x oilier Datum elevation (DF or KB) KBE = 75.29 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-18 (13-02-11-12) PBU 9. Permit number 84-125 10. APl number 50- 029-21156 11. Field/Pool Prudhoe Oil Pool Casing Length Structural -- Conductor 110 Surface 3020 Intermediate 11615 Production -- Liner 764 Perforation depth: measured Size Cemented Measured depth True vertical depth BKB 20x30 8 c.y. 145 1 45 13 3/8 4265 c.f. 3055 2687 9 5/8 2426 c.f. 11650 8847 7 375 c.f. 11846'-11860', 11866'-11915', 11925'-11940' 11376-1214O true vertical subsea 8906'.8969'(three~rvals) Tubing (size, grade, and measured depth) 4 1/2"L-80 to 11297'with 4 1/2" tailp~oe to 11411' Packers and SSSV (type and measured depth) 9 5/8" TIWpacker at 11297'; 4 1/2" SSSV at 2142' 8656-9171 13. Attachments Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation I February 1989 16. If proposal was verbally approved Oil X Gas~ Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~,'~'~~"~,~.~~ Title Manager Production Engineering // FOR COMMISSION USE ONLY Con(~t~ns of approval: Notify Commission so representative may witness v Plug integrity BOP Test Location clearance Mechanical Integrity Test~ Subsequent form required 10- ~ 15. Status of well classification as: Suspended __ Approved by order of the Commission 0RIGINAL~ SIGNED BY LONNIE C. SMITH Commissioner Date Form 10-403 Rev 06/15/88 ~p.nroved Copy Returned SUBMIT IN TRIPLICATE ,WELL S-18 (13-02-11-12] PBU STIMULATION PROPOSAL A mud acid wash and contingent scale inhibition treatment are proposed for the following perforated intervals in Well S-18. 11846'- l1860'MDBKB 11866'- ll915'MDBKB 11925'- l1940'MDBKB The mud acid treatment will be bullheaded as follows: a) c) d) e) f) g) h) i) j) k) l) m) n) o) 1500 gal. 15% HC1/10% xylene 3000 gal. 6% HCI/1.5% HF 2000 gal. 2% NH4CI brine 500 gal. 2% NH4C1 brine w/mutual solvent w/100 7/8" 1.0 SG ballsealers dropped evenly throughout the fluid 500 gal. 2% NH4CI brine w/mutual solvent w/100 7/8" 1.0 and 50 5/8" 1.1 SG ballsealers dropped evenly throughout the fluid 1500 gal. 15% HC1/10% xylene 3000 gal. 6% HCI/1.5% HF 2000 gal. 2% NH4CI brine 500 gal. 2% NH4CI brine w/mutual solvent w/100 7/8" 1.0 SG ballsealers dropped evenly throughout the fluid 500 gal. 2% NH4C1 brine' w/mutual solvent w/100 7/8" 1.0 and 50 5/8" 1.1 SG ballsealers dropped evenly throughout the fluid 1500 gal. 15% HC1/10% xylene 3000 gal. 6% HCI/1.5% HF 2000 gal. 2% NH4CI brine 1000 gal. 2% NH4C1 brine w/mutual solvent 180 bbls. dead crude If the mud acid wash is successful, the following scale inhibition treatment will be performed via coiled tubing: a) b) c) d) e) 15 bbls. diesel preflush 15 bbls. methanol 29 bbls. EDTA w/OSR 98-117 bbls. scale inhibitor w/OSR Displace from CT with 15 bbls. seawater followed by diesel After a 24-hour shut-in period, the well will be returned to production and tested. jm 2/14/89 Coiled Tubing Blow-Out-Preventers Coiled Tub lng · . Pack-Of~ Blind Rams Cutter Rams Chlcksan (Kill Line) Slips Pipe Rams .Pump-In Sub ~ (Circulate/Returns) Well Head Swab Valve Standard Alaska Production Company 900 F:ast Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION January 5, 19 88 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well S-18 (13-02-11-12) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry kpprovals, for the above-named well. This contains our proposal to perforate the well. Yours very truly, ~r Waterflood & Miscible Flood BJP:JAM Enclosures (9) cc: L. Burke (MB12-1) S-18 Well File ~ ~'\ ~ ~ . Aias~ .0il _& Gas Cons. C0mn~i.0i'i. A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISsiON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon~ Suspend Alter casing ~ Repair well Change approved program 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2314'SNL, 711' EWL, SEC. 35, T12N, R12E, UPM At top of productive interval 1044' NSL, 1452' EWL, SEC. 02, TI 1N, R12E, UPM At effective 'depth 850' NSL, 1454' EWL, SEC. 02, T11N, R12E, UPM At total depth 817' NSL, 1455'EWi_, SEC. 02, T11N, R12E, UPM 12. Present well condition summary Total depth: measured 12140 feet true vertical BKB 9171 feet Operation Shutdown ~ Re-enter suspended well Plugging ~ Time extension Stimulate ~ Pull tubing. Variance ~ Perforate X Other~ 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE--75.29 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-18 (13-02-11-12) PBU 9. Permit number 84-125 10. APl number 50- 029-21156 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Effective depth: measured 12098 feet true vertical BKB 9144 feet Junk (measured) Casing Length Structural -- Conductor 110 Surface 3020 Intermediate 11615 Production -- Liner 764 Perforation depth: measured Size Cemented Measured depth True vertical depth BKB 20x30 8 c.y. 145 145 13 3/8 4265 c.f. 3055 2687 9 5/8 2426 c.f. 11650 8847 7 375 c.f. 11846'-11860', 11866'- 11915', 11925'- 11940' 11376-1214O true vertical subsea 8906'- 8969' (three intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 11297' with 4 1/2" tailp~oe to 11411' 8656-9171 Packers and SSSV (type and measured depth) 9 5/8" TIWpacker at 11297'; 4 1/2" SSSV at 2142 13. Attachments Description summary of proposal ,x Detailed operations program BOP sketch X 14. Estimated date for commencing operation January 1989 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: 0il X Gas~ Suspended ~ Service i7. I hereby certify that the forego~p~ i~true~d correct to the best of my knowledge. Conditions of approval: Notify Commission so representative may witness I Approval No. Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- ~ '~' ORIGINAL SIGNED BY Approved by order of the Commission LONNIE C. SMITH Commissioner Date ~orm 10-403 Rev 06/15/88 Approved Copy Returne;] SUBMIT IN TRIPLICATE WELL S-18 (13.02-11.121 PBU ADD'L. PERFORATION PROPOSAL We propose to perforate the following Sag River interval during January 1989: 11668' - 11719' MD BKB (Ref. BHCS, 9/30/85) A lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to production immediately following perforating operations, then tested. jm 1/4/89 FLOW TUBES & PACKOFF BOWEN PACKOFF ,N--HAND GREASE SEAL FLOWTUBE PUMP FLOWLIN E ~ GREASE LINE GREASE / MANIFOLD GREASE PUMP RISER B OP ..~- GREASE RESERVOIR Standard Alaska Production Company 900 East 8ansan 6aulev. P.O. Bo, 19661~ Anchorage. Alaska 99519-6612 (907) 564-§1 ! I HOUSTON ARCO CHEVRON EXXON TEXACO TO: MOBIL PHILLIPS _STATE OF ALASKA GEOSCIENCES RESERVOIR REFERENCE: ARCHIVES SAPC CASED HOLE FINAL LOGS INDEXED ~'TANDARD ALASKA PRODUCTION Date: 01/04/89 Ti: 79693 The following material Is being submil~ed herewith. Please acknowledge receipt by signing a copy of this letter and returnlng It to this office: B-05 GR/CCL 12/16/88 #I 10000-11872 Camco 5" E-06 GR/CCL 12/16/88 #I 8400-9478 Camco 5" GC-2C Inj F 12/13/88 #I 4850-5800 Camco 5" R-05 Perf-R 12/28/88 #I 8994-9510 Sch 5" S-18 Gas Lift T~p 12/14/88 #I Surf-11993 Camco 5" W-18 GR/CCL 12/13/88 #I 8500-9501 Camco 5" W-27 CBT 12/27/88 #I 10210-11631 Sch 5" W-27 CET 12/27/88 #I 10210-11652 Sch 5" Z-28 GR/CCL 12/17/88 #I 9050-10202 Camco 5" Received Alaska Oil &~-'~ C¢~,:.. CcmmissL :; Jenni~ Diaz I NFORMAT i ON CONTROL Wel I Records LR2-1 A uni! oi Ihe o~',ginol Slam:lord Oil Company Founded in Cle~,elond, Ohio. ,n 1870. Standard Alaska Production Com~am 900 East Benson Boul P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) ,561-5111 STANDARD ALASKA PRODUCTION May 25, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well S-18 (13-02-11-12) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of stimulating the well. Yours very truly, JAB:JAM anager Production ~ngineering Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 S-18 Well File A unit of the original Standard C~I Company Founded in Cleveland Ohio in 1870. Operation performed: Operation shutdown [] Stimulate [] STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Plugging [] Perforate [] Pull tubing [] Alter casing [] Other [] 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2314' SNL, 711' EWI_, SEC. 35, T12N, R12E, UPM At top of productive interval 1044' NSL, 1452' EWL, SEC. 02, T11N, R12E, UPM At effective depth 850'NSL, 1454'EW1_, SEC. 02, T11N, R12E, UPM At total depth 817'NSL, 1455'EW1_, SEC. 02, T11N, R12E, UPM 5. Datum elevation (DF or KB) KBE = 75.29 AMSL feet 8. Unit or Property name Prudhoe Bay Unit 7. Well number S-18 (13-02-11-12) PBU 8. Approval number 8-15 9. APl number 5 0 - 029-21156 10. Pool Prudhoe Oil Pool 1. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 12140 feet true vertical BKB 9171 feet measured 12098 feet true vertical BKB 9144 feet Length Size .. 110 20x30 3020 13 3/8 11615 9 5/8 __ 764 measured Plugs (measured) Junk (measured) Cemented Measured depth True Vertical depth BKB 8 c.y. 145 145 4265 c.f. 3055 2687 2426 c.f. 11650 8847 Tubing (size, grade and measured depth) 7 375 c.f. 11846'-11860', 11866'-11915', 11925'-11940' true vertical subsea 8906' - 8969' (three intervals) 4 1/2" L-80 to 11297' with 4 1/2" tailpipe to 11411' 11376-1214O 8656-9171 Packers and SSSV (type and measured depth) 9 5/8" TIWpacker at 11297'; 4 1/2" SSSV at 2142' 2. Stimulation or cement squeeze summary Intervals treated (measured) see attachment Treatment description including volumes used and final pressure . Prior to well operation Subsequent to operation Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 70 295 36 1058 850 463 18 1499 Tubing Pressure 219 223 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Form I 1 Title Manager Production Engineering Date Submit in Duplicat,=, WELL S-18 (13-02-11-12~ PBU ~.TIMULATION OPERATIONS A two-stage mud acid treatment was performed May 14, 1988 on the following perforated intervals in Well S-18. 11846'- l1860'MDBKB 11866'- ll915'MDBKB 11925'- l1940'MDBKB The treatment consisted of the following: Stage 1' 48 bbls. 15% HCI w/10% dispersed xylene 56 bbls. 12% HCI - 3% HF 60 bbls. 3% NH4C1 brine 23 bbls. 3% NH4C1 brine w/OSR diverter Stage 2: 64 bbls. 15% HC1 127 bbls. 12% HC1 - 3% HF 50 bbls. diesel w/mutual solvent The treatment fluids were displaced to the perforations with 180 bbls. dead crude. The well was returned to production immediately following the treatment, then tested. jm 5120188 Pro. du~lmn Company' 900 ~t~, PO ~- 190012 ~F~ 564 3 I I I INDEXED DALLAS ARCO S'rANDARD C~]F.V~ON ALASKA P~ODUCTION E~XON Date: 02/12/88 TEXACO 78547 TO: Y~: MOBIL PHILLIPS ~.~ATE OF ALASKA~_..__~) REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: A-26 01/27/88 Static Survey GO A-29 01/30/88 " " Camco A-32 01/28/88 " " GO B-20 01/28/88 " " Camco B-29 01/27/88 " " GO C-I2 01/31/88 " " Camco C-35 01/31/88 " " Camco G-19 02/01/88 " " GO G-26 01/30/88 " " Camco H-22 01/25/88 " " Camco J-21 01/29/88 " " GO N-22 01/24/88 " " Camco 01/30/88 " " so U-8 01/23/88 " " Camco X-2 01/24/88 " " Camco X-7 01/27/88 " " Camco X-27 01/26/88 " " Camco Y-2 01/09/88 " " Camco Founded ,n Cleveland. ~,o. ,~ 1870 Victoria Aldridge INFORHATION CONTROL Well Records LR2-1 Standard 'Alaska Production Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 1907) 561-5111 STANDARD ALASKA PRODUCTION January 14, 1988 Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Enclosed, Approvals, Well S-18 (13-02-11-12) PBU in triplicate, is Form 10-403, Application for Sundry for the above-named well. This contains our proposal to stimulate the well. Yours very truly, JAB:JAM-iI9~ Enclosures (6) cc: J. L. Haas (MB12-1) S-18 Well File . Bragg get Production Engineering RECEIVED JAN t 8 ~¢'""~' Alaska Oil & Gas Cons. Commission Anchorage A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASr~A OIL AND GAS CONSERVATION COMiv, iSSlON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown E] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate ,'~ Pull tubing [] Amend order [] Perforate [] Other Fi 2. Name of Operator 5. Datum elevation (DF or KB) STANDARD ALASKA PROBUOTION 60HPANY KBE = 75.29 AHSL feet 3. Address 6. Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 2314' SNL, 711' EWL, Sec. 35, T12N, R12E, UPM At top of productive interval 1044' NSL, 1452' EWL, Sec. 02, T11N, R12E, UPM At effective depth 850' NSL, 1454' EWL, Sec. 02, T11N, R12E, UPM At total depth 817' NSL, 1455' EWL, Sec. 02, T11N, R12E, ~PM 7. Well number S-18 (13-02-11-12) PBU 8. Permit number 84-125 9. APl number 5O--029-21156 10. Pool Prudhoe 0il Pool 11. Present well condition summary Total depth: measured true vertical 12140 feet Plugs (measured) 9171 feet BKB Effective depth: measured true vertical 12098 feet Junk (measured) 9144 feet BKB Casing Length Size Structural -- Conductor 110' 20"X30" Surface 3020' 13 3/8" Intermediate 11615' 9 5/8" Production -- Liner 764' 7" Perforation depth: measured 11846' - 11940' true vertical (SS) 8906' - 8969' Cemented 8 cu.yds. 4265 c.f. 2426 c.f. 375 c.f. (three intervals) Tubing (size, grade and measured depth) 4 1/2" L-80 to 11297' with 4 1/2" tailpipe to 11411' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 11297'; 4 1/2" SSSV at 2142' 12.Attachments Measured depth 145' 3055' 11650' ~ue Vertical depth BKB 145' 2687' 8847' 11376'-12140' 8656'-9171' RECEIVED JAN 1 8 0il & Gas Cons. Commissio. Anchorage Description summary of proposal )~ Detailed operations program [] BOP sketch 13. Estimated date for commencing operation January 1988 14. If proposal was verbally Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Sig~ed~ //~/~~ Titlefvlanager Production Engineering /',,¢'. A. Bragg ~/~ Commission Use Only Conditionst"'" of approval Notify commission so representative may witness ! Approval No. [] Plug integrity E] BOP Test E] Location clearanceI Date/'/d" 2y Approved by ORIGINAL SIGNED BY LONNIE C. SMITH Approved Copy Returned Commissioner by order of the commission Date Form 10-403 Rev 124-85 Submit in triplicate following perforated ' Pa 15% HC1/×ylene tubing was~. A two-stage mud acid treatmenti~nS roposed for the intervals in Well S-15, fol, low g 11B46' - 11860' ~AD BKB 11866' 11915' MD BKB 11925' 11940' MD BKB Ihe treatment will consist of the following' stage 1' 48 bblS. 15% HC1 w/10% dispersed xylene 56 bbls. 12% HC1 - 3% BF 60 bblS. 3%o NB4C1 brine 25 bblS. 3% NH4C1 brine w/OSR diverter stage 2' 65 bbls. 15% HC1 130 bbls. 12% BC1 - 3% HF 50 bbls. diesel w/mutual solvent · s with dead crude. ~ erfor~t~n ~_. +~ re~tment, Ihe treatment fluids will be disol~ced ty ~%~¢~1v follOW~.9 .... t Ihe well will be returned to production ~m"=~ ..... then tested. RECEIVED JAN 1 8 Alaska Oil & Gas Cons. Anchorage Standard Alaska Production Compo 900 East Benson Bow. -ard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION September 28, 1987 Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well S-18 (13-02-11-12) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of stimulating the well. YoUrs very truly, upervisor ~roduction uperations JAB: JAM ~ Enclosures (4) J. L. Haas (MB12-1) Well Records (LR2-1) w/10 S-18 Well File SEP: ,.,.,. ~?.:~1 Alaska 011 & Gas Cons. Commission Anchorage A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. ,---- STATE OF ALASKA ~-- AL/ iA OIL AND GAS CONSERVATION CO. i'ISSION REPORT OF SUNDRY WELL .OPERATIONS 1. OPerations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other [] 2. Name of Operator 5. Datum elevation (DF or KB) STANDARD ALASKA PRODUCTION COMPANY KBE = 75.29 Feet 3. Address 6. Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 2314' SNL, 711' EWL, Sec. 35, T12N, R12E, UPM At top of productive interval 1044' NSL, 1452' EWL, Sec. 02, TllN, R12E, UPM At effective depth 850' NSL, 1454' EWL, Sec. 02, TllN, R12E, UPM At total depth 817' NSL, 1455' EWL, Sec. 02, TllN, R12E, UPM 7. Well number S-18 (13-02-11-12) PBU 8. Approval number 7-448 9. APl number 50-- 029-21156 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured true vertical 12140 9171 Effective depth: measured 12098 true vertical 9144 Casing Length Size Structural -- Conductor 70' 20"x30" Surface 3015' 13 3/8" Intermediate 11610' 9 5/8" Production -- Liner 764' 7" Perforation depth: measured 11846' - 11940' true vertical (ss) 8906' - 8969' feet Plugs (measured) feet BKB feet Junk (measured) feet BKB Cemented Measured depth True Vertical depth BKB 8 cu.yds. I10' 110' 4265 c.f. 3055' 2687' 2426 c.f. 11650' 8847' 375 c.f. 11376'-12140' (three intervals ) Tubing (size, grade and measured depth) 4 1/2" L-80 to 11297' with 4 1/2" tailpipe to 11411' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 11297'; 4 1/2" SSSV at 2142' 8656' -9171' 12. Stimulation or cement squeeze summary See attachment Intervals treated (measured) Treatment description including volumes used and final pressure SEP ) r' I~...'..!~ ~ Alaska Oil 8, Gas Cons. Commissio~ Anchorage 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 60 325' 3 968 180 321' 16 1066 Tubing Pressure 214 217 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Form 10~1~4 Rev. 12'-1-85 ~//- TitleSupervisor Production Operations Submit in Duplicate,,,/ Well S-18 (13-02-11-12) PBU STIMULATION OPERATIONS A 3% NH4C1/xylene perforation wash via coiled tubing was performed August 29, 1987 on the following perforated intervals in Well S-18. 11846' - 11860' MD BKB 11866' - 11915' MD BKB 11925' - 11940' MD BKB The treatment consisted of the following: Se b. ce d. e. d. 500 gal. NH4C1 W/50% xylene & dispersant while moving CT from top perfs to bottom perfs 30 bbls. 65-quality foam - 10.5 bbls. NH4C1 w/30 MSCF nitrogen pumped at 2.5 MSCF/bbl. ratio while CT stationary at bottom perf. 600 gal. NH4C1 w/50% xylene & dispersant while recip- rocating CT across perfs 50 bbls. 65-quality foam - 17.5 bbls. NH4C1 w/50 MSCF nitrogen pumped at 2.5 MSCF/bbl. ratio while CT stationary at bottom perf 900 gal. NH4C1 w/50% xylene & dispersant while recip- rocating CT across perfs Displaced brine/xylene out of coiled tubing with diesel The well was left shut in four hours; then returned to production and tested. jm 9/17/87 RECEIVED SEP Alaska 011 & Gas Cons. Commissior~ Anchorage Standard Alaska ~ Production Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 July 16, 1987 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well S-18 (13-02-11-12) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, JAB:jAMi'[£' Enclosures (9) cc: J. L. Haas (MB12-1) S-18 Well File ~ -A Bragg~~~ ~r Production Operations RECEIVED JUl. 2 o 1987 Alaska Oil & Gas Cons. Commission Anchorage A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASr,,A OIL AND GAS CONSERVATION COIV,,.,,SSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other [] . . Name of Operator STANDARD ALASKA PRODUCTION COMPANY Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 2314' SNL, 711' EWL, Sec. 35, T12N, R12E, UPM At top of productive interval 1044' NSL, 1452' EWL, Sec. 02, TllN, R12E, UPM At effective depth 850' NSL, 1454' EWL, Sec. 02, TllN, R12E, UPM At total depth 817' NSL, 1455' EWL, Sec. 02, TllN, R12E, gPM 5. Datum elevation (DF or KB) ](BE = 75.29 6. Unit or Property name Prudhoe Bay Unit 7. Well number S-18 (13-02-11-12) PBU 8. Permit number 84-125 9. APInumber 50-- 029-21156 10. Pool Prudhoe Oil Pool feet 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12140 feet 9171 feet BYJ~ 12098 feet 9144 feetBKB Plugs (measured) Junk (measured) Casing Length Size Structural -- Conductor 70' 20"×30" Surface 3015 ' 13 3/8" Intermediate 11610' 9 5/8" Production -- Liner 764 ' 7" Perforation depth: measured 11846' - 11940' true vertical (ss) 8906' - 8969' Cemented 8 cu.yds. 4265 c.f. 2426 c.f. 375 c.f. (three intervals) ~bing(size, grade and measured depth) 4 1/2" L-80 to 11297' with 4 1/2" tailpipe to 11411' Packers and SSSV(type and measured depth) 9 5/8" TIW packer at 11297'; 4 1/2" SSSV at 2142' · Measured depth 110' 3055' 11650' 11376'-12140' True Vertical depth BKB 110 ' 2687' 8847 ' 8656'-9171' RECEIVED .,,_, L. ? 1987 Alaska (JH ~ Gas Cons. Commission Anchorage 12.Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation July/August 1987 14. If proposal was verbally approved Name of approver Date approved -15. I hereby certify that the foregoing is true and correct to the best of my knowledge '"~igned ~ /~~ Title Supervisor Production OperationsDate 7 //,j,~. A. Bragg ' UU Commission Use ' Only Conditte'ns of approval Notify commission so representative may witness I Approval No. . ,. AC" [] Plug integrity [] BOP Test [] Location clearanceI Approved by JJ¥ L~l'il~iE 1L SI~IT, tt Approved Co~.v ~l~t. urn,~<~ ~ Commissioner the commission Date '1 Form 10-403 Rev 12-1-85 Submit in triplicate Well S-18 (13-02-11-12) PBU STIMULATION PROPOSAL A 3% NH4C~xylene perforation wash is proposed for the following perforated intervals in Well S-18. 11846' - 11860' MD BKB 11866' - 11915' MD BKB 11925' - 11940' MD BKB The treatment will consist of the following pumped via coiled tubing: a. 500 gal. NH4C1 w/50% xylene & dispersant while moving CT from top perfs to bottom perfs b. 30 bbls. 65-quality foam - 10.5 bbls. NH4C1 w/+_30 MSCF N2 pumped at a 2.5-3.0 MSCF/bbl ratio while CT stationary at bottom perf c. 600 gal. NH4C1 w/50% xylene & dispersant while reciprocating CT across perfs d. 50 bbls. 65-quality foam - 17.5 bbls. NH4C1 w/+_50 MSCF N2 pumped at a 2.5-3.0 MSCF/bbl ratio while CT stationary at bottom perf e. 900 gal. NH4C1 w/50% xylene & dispersant while reciprocating CT across perfs . f. Displace brine/xylene out of CT w/diesel. The well will be left shut in four hours following the treatment, then put back on Production and tested. REC. E1VE Gas Oons. Commission Anchorage jR 7/14/87 Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Off Blind Rams Cutter 'Rams 2' Chicksan (Kill Line) Slips Pipe Rams Pump-In Sub (C irculate/R e turns) Well Head RECEIVED Swab Valve JUL P 0 Alaska Oil & Gas Oons. ¢ornmission Anchorage Slondard Alaska P~'oductJon Company 900 Eo~.! Benson Boule,,, P.O. Box 196612 Anchorage. AlosI, a 99..519.661~ ~907) 564-5 i I I INDEXED DALLAS ARCO c, .woN STANDARD ALASKA PRODUCTION TEXACO Date: 02~20~87 TO: MOBIL TI: 77727~ . PHILLIPS / STATE OF ALASKA~ GEOSC IENCES REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith, Please acknowledge receipt by signing a copy of this letter and returning It to this office: B-23 F-17 F-17 H-13 H-26 J-1 N-3 N-3 N-8 S-18 T-7 Y-7 Y-13 Y-24 Completion Record 09/23/86 #2 8340-9966 Sch 5" MWP-Measurement While Perf. 02/05/87 #1 10800-11374 Sch Perf. Record 02/05/87 #1 10800-11374 Sch 5" Completion Record 01/31/87 #1 9200-9651 Sch 5" Completion Record 09/13/86 #1 9462-9989 'Sch 5" Junk Basket 09/30/85 #1 8900-9128 Sch 5" Tubing Puncher 09/28/86 #1 9145-9600 Sch 5" Collar Record 10/11/86 #1 8172-9331 Sch 5" EPL 07/10/86 #1 9595-9970 Sch 5" Completion Record 09/26/86 #1 11200-12003 Sch 5" Completion Record 09/25/86 #2 8900-9600 Sch 5" Completion Record 05/14/86 #1 8450-9845 Sch 5" Completion Record 09/14/86 #1 9590-10620 ScA 5" Prod. Logging 02/02/87 #1 3100-13416 Dres 5'" 5!1 Rece i ved ~ Date A unll al the o,iglnot $1ondo,,d Oil Company Founded in (le,,elond. C~io. Victoria Aldridge I NFORMAT I ON CONTROL Wel I Records LR2-1 Standard Alaska Production Company '"-~.. 900 East Benson Boulev P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 564-5111 December 9, 1986 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Well S-18 (13-02-11-12) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of perforating the well. Yours very truly, SLB:JAM Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 S-18 Well File S. L. Bryant, Superviso~ Reservoir/Production Surveillance Unit II A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. ~-,,. STATE OF ALASKA ALASF )IL AND GAS CONSERVATION COMM"-'hlON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~ Stimulate ~ Plugging ~ Perforate'~, Pull tubing Alter Casing ~ Other ~ 2. Name of Operator 5. Datum elevation (DF or KB) STANDARD ALASKA PRODUCTION COMPANY KBE = 75.29 Feet 3. Address 6. Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 2314' SNL, 711' EWL, Sec. 35, T12N, R12E, UPM At top of productive interval 1044' NSL, 1452' EWL, Sec. 02, TllN, R12E, UPM At effective depth 850' NSL, 1454' EWL, Sec. 02, TllN, R12E, UPM At total depth 817' NSL, 1455' EWL, Sec. 02, TllN, R12E, UPM 7. Well number S-18 (13-02-11-12) PBU 8. Approval number 345 9. APl number 50-- 029-21156 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth' measured true vertical Effective depth: measured true vertical 12140 feet Plugs (measured) 9171 feet BKB 12098 feet Junk (measured) 9144 feet BKB Casing Length Size Structural -- Conductor 70 ' 20"x30" Surface 3015 ' 13 3/8" Intermediate 11610 ' 9 5/8" Production -- Liner 764 ' 7" Perforation depth: measured 11846' - 11940' true vertical(subsea) 8906' - 8969' Cemented 8 cu.yds. 4265 c.f. 2426 c o f. 375 c.f. (three. intervals) Tubing (size. grade and measured depth) 4 1/2" L-80 to 11297' with 4 1/2" tailpipe to 11411' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 11297'; 4 1/2" SSSV at 2142' 12. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure Measured depth 110' 3055' 11650' 11376'-12140' True Vertical depth BKB 110' 2687' 8847 ' 8656'-9171' 13. Repre,,entative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 520 216 4 0 201 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run ~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge ~7~- ~ "'Z [-- I~..~ Signed ,Z,~~ ,/------¢-~ ~. L. %~ TitleSupvr. Res./Prod. Surveillance II Date Form 10-404 Rev. 12-1-85 / Submit in Duplicate PERFORATING DATA - Well S-18 (13-02-11-12) PBU 9/24/86 Pressure teSted tubing and inner annulus. 9/26/86 Installed and tested lubricator to 3500 psi for all well work. Rigged up Schlumberger and perforated the following ........... · -- intervals for initial production using 2 7/8" Hyperdome guns at 4 spf: 11846' - 11860' MD (8906' - 8915' TVDss) 11866' - 11915' MD (8919' - 8952' TVDss) 11925' - 11940' MD (8959' - 8969' TVDss) Ail depths are referenced to BHCS/GR, 8/11/85. Put well on production and tested. 10/11/86 Shut in well to prepare for initial static pressure survey. 10/13/86 Ran initial static pressure surVey at 8800' TVDss. 12/6/86 Set and tested SSSV in ball valve nipple at 2142'. Well on production. (Note: The Sag River interval (11686' - 11714' MD) as proposed in our Sundry Notice of 3/12/86 will not be shot due to suspected gas.) jm 12/8/86 Standard Alaska ~ Productien Company 900 Eost Benson Boulevaru P.O. Box 196612 Anchorage, AIoska 99,519-66 (907) 564-§ I I I I NOEXED DACT~S A~CO CHEVRON STANDARD ALASKA PRODUCTION EXXON Date: 11 / 03 / 86 TEXACO 7 7484 TO: Tt: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES (Transmittal Only) REFERENCE: · SAPC FINAL DATA - PRESSURE SURVEY DATA The following materiel Is belng submlt-I'ed herewith. Please acknowledge receipt by signing e copy of thls lel-I'er end refubnlng IY fo fhls office: ~ B-2 ~ C-29 ~ F-4 ~' H-20 ~ J-6 v M-5 ~ R-26A ~' R-27 ~'S-18 '- Y-23 Static Gradient 09/15/86 Camco " " 09/03/86 " " " 10/16/86 " " " 10/04/86 " " " 10/04/86 Otis " " 10/03/86 Camco " " 10/02/86 Otis " " 10/20/86 Camco " " 10/13/86 Camco " " 10/13/86 Camco " " 10/15/86 Camco Received Dale A u-,! ol ~he Of,g,nol 5to,~¢h,fd (~1 Co,npon), Founded ,. (.le~ela-d. Oh,o. ,n 18/0 Standard Alaska Production Company 900 East Benson Boulew P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 564-5111 August 19, 1986 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Well S-18 (13-02-11-12) PBU Gentlemen: Enclosed, in triplicate, is Approvals, for the above-named perforate the well. Form 10-403, Application well. This contains our for Sundry proposal to Yours very truly, SLB:JAM~ Enclosures (9) cc: J. L. Haas (MB12-1) S-18 Well File S. L. Bryant, Supervisor Reservoir/Production Surveillance Unit II A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. RECEIVED AUG 2 1 1986 Alaska 0il & Gas Cons. Commission Anchora~le ~ STATE OF ALASKA ~.. , · . ALASK )IL AND GAS CONSERVATION COMM "ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown C Re-enter suspended well ~ Alter casing 3_ Time extension ~ Change approved program ~ Plugging ~ Stimulate ~ Pull tubing ~ Amend order '~ Perforate i~ Other- 2. Name of Operator 5. STANDARD ALASKA PRODUCTION COMPANY 3. Address 6. P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 7. 2314' SNL, 711' EWL, Sec. 35, T12N, R12E, UPM At top of productive interval 1044' NSL, 1452' EWL, Sec. 02, TllN, R12E, UPM At effective depth 850' NSL, 1454' EWL, Sec. 02, TllN, R12E, UPM At total depth 817' NSL, 1455' EWL, Sec. 02, TllN, R12E, UPM Datum elevation (DF or KB) KBE = 75.29 feet Unit or Property name Prudhoe Bay Unit Well number S-18 (13-02-11-12) PBU 8. Permitnumber 84-125 9. APInumber 50-- 029-21156 10. Pool Prudhoe Oil Pool 11. Present well condition Summary Total depth: measured true vertical 12140 feet Plugs (measured) 9171 feet BKB Effective depth: measured 12098 feet Junk (measured) true vertical 9144 feet BKB Casing Length Size Cemented Structural - -- Conductor. 70' 20"x30" 8 cu.yds. Surface 3015' 13 3/8" 4265 c.E. Intermediate 11610' 9 5/8" 2426 c.E. Production -- Liner 764' 7" 375 c.f. Perforation depth: measured true vertical Measured depth True Vertical depth BFd3 110' 110' 3055 ' 2687 ' 11650 ' 8847 ' 11376 ' -12140 ' 8656 ' -9171 ' RECEIVED Tubing (size, grade and measured depth) 4 1/2" L-80 to 11297' with 4 1/2" tailpipe to 11411' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 11297'; 4 1/2" ball valve nipple at 2142' 12.Attachments Description summary of Proposal .~, Detailed operations program AUG 2 1 1986 Alaska 011 & Gas Cons. Commission Anchorage BOP sketch 13. Estimated date for commencing operation August/September 1986 14. If proposal was verbally approved Name of approver Date approved .15. I hereby certify that the foregoing is true and correct to the best of my knowledge S~gned --~~/~~ ~ Titlesupvr. Res/Prod. Su~eillance ii Date~ '/ ~'~ ~//~ I S. L. Bryant Commission Use Only Conditions of approval Notify commission so representative m'ay witness Q Plug integrity Fq.. BOP Test Fi Location clearance Y",J Approved by Approval No. ............ ~-J~- ~ by order of commi~ib'd'b~ ..... the commission Date Form 10-403 Rev 124-85 Submit in triplicate Well S-18 (13-02-11-12) PBU PERFORATING PROPOSAL We propose to perforate the following Ivishak intervals for initial production during August/September 1986 at 4 spf: 11846' - 11860' MD (8906' - 8915' TVDss) 11866' - 11915' MD (8919' - 8952' TVDss) 11925' - 11940' MD (8959' - 8969' TVDss) All depths are referenced to BHCS/GR, 8/11/85. A lubricator will be installed and tested to 3500 psi for all well work. Following perforating operations, an SSSV will be set and tested in the ball valve nipple at 2142'. RECEIVED AUG 2 1 198~ jm 8/18/86 Alaska Oil & Gas Cons. Commission Anchorage FLOW TUBES & PACKOFF BOWEN PACr~OFF 1~- HAND PUMP GREASE SEAL FLOWTUBE FLOWLINE GREASE LINE FLOWLINE._~~J VALVE RISER GREASE /--MANIFOLD GREASE PUMP BOP ...-GREASE RESERVOIR RECEIVED AUG 2 1 1986 At~.cka Oil & Gas Cons. Commission, An,,h~,age SOHIO ALASKA PETROLEUM COMPANY DALLAS ARCO CHEVRON E~CXON ,o: DAL/UNIT/STATE: TEXACO (-.Hara thon) MOBIL PHILLIPS ~>-~. STATE OF AK BPAE 3111 "C" STREET A~',;CHORAGE. ALASKA TELEPHONE ¢907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 04/18/86 77006 GEOSCI~NCES REFERENCE: SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning, it to this office:-- DAL/UNIT/STATE/GEOS: A-28 'CRL 01/03/86 #1 11500-11955 Sch 5" Q-3 Packer Depth 01/17/86 #2 4i00-4362 Sch 5" S-15 Temp. 04/08/86 #1 20-2500 Camco 5" S-18 Temp. 04/08/86 #1 40-2500 Camco 5" RECEIVED Victoria Aldridge LR2-1 INFOP~MAT ION CONTROL WELL RECORDS LR2-1 DAli 19 SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 March 12, 1986 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive- Anchorage, AK 99501 Attn: Mr. C. V. Chatterton Well S-18 (13-02-11-12) PBU Gentlemen: Enclosed in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This contains our proposal to perforate the well. Very truly yours, S. L. Superviso~~. Reservoir/ ProductJ. e~:~ Surveillance Unit II SLB:JAI~.~ Enclosures (3) cc: Drilling Well Files (MB 12-1) Well Records (LR 2-1) S-18. Well File 4052m RECEIVED MAR 1 4 1986 Alaska 0il & Gas Cons. Commissiori Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL I~ 2. Name of Operator 7. Permit No. STANDARD ALASKA PRODUCTION COMPANY 84-125 3. Address 8. APl Number P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 50-029-21156 4. Location of Well OTHER [] At surface: 2314' SNL, 711' EWL, Sec. 35, T12N, R12E, UPM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. KBE = 75.29' AMSL I ADL 28260 12. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number S-18 (13-02 -11-12) PBU 11. Field and Pool prUdhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.} 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following interval will be perforated for initial production in March/April, 1986 at 4 spf: 11686' - 11714' BKB (Ref. BHCS/GR, 8/11/85) A lubricator will be installed and tested~to 3500 psi for all well work. An SSSV will be set and tested in the ball valve nipple at.2142'. RECEIVED MAR 1 4 1986 ~.,i~ ,.~ -~.:b ;.~;.'i.~ ~,u,~ ;". :':'..'; :,'t;) f~t.g~¢ 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Supvr. ReserVoir/Production Thesp~e below for Commission use ' S. ~L. Bryant Surveillance Unit II Date Conditions of Approval, ~f any: Approved by ~proved Copy ~eturned 8y Order of COMMISSIONER the Commission Form 10-403 Subm,t "lnlent,ons" ,n Tr,plicate SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON TO: SFO/UNIT/STATE: TE]CACO (-Marathon) MOBIL PHILLIPS STATE OF AK BPAE 31 I 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 10-17-85 T#- 76499 REFERENCE: SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- S-18 8-14-85 GCT Directional 12033-12098 Sch RECEIVED [")AT[ .... Technical Documentation '-~,~S Cons ' Records Management SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON SFO/UNIT/ TEXACO STATE: ~ tARATHON MOBIL PHILLIPS *STATE OF AK BPAE (Transmittal Only) 31 1 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE i907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Da te: T~/: 09/03/85 76421 *Date to State Via Drilling: REFERENCE. SOHIO OPEN HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing copy of this letter and returning ~ to this office:- SFO/UNIT / STATE: N-4A N-11A S-18 S-18 S-18 ~fw~/Gamma Plus Directional MWD/Gamma Plus Directional MWD/Gamma Plus Directional Mkq)/Gamma Plus Directionml MUD log 07/30/85-08/04/85 07/09/85-07/16/85 Teleco 06/19/85-06/26/85 Teleco 07/27/85-08/08/85 Teleco 07/27/85-08/08/85 Teleco 3065-9340 Baroid 2" 8410-9880 2" 8162-9880 2" 7170-11660 2" 5500-8878 2" STATE ONLY: DIRECTIONAL SURVEYS Magnetic Single Shot Directional Survey Date: Job#: Gyroscopic Directiona2 Survey RECeiVED ()AT [ Date' Job~~: '~ ~~Victoria A ldridge L R2-1 '~ ~" ~- 0 Technical Documentation ~'~ ~' ~ Records Management SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON SFO/UNIT/ TEXACO lO~ STATE: ~tARATHON MOBIL PHILLIPS *STATE OF AK BPAE (Transmittal Only) 3~ 11 "C" STREET ANCHORAGE. ALASKA fELEPHONE (907l 265-0000 MAIL: POUCH 6-6 I 2 ANCHORAGE. ALASKA 99502 Date: T#: 09/04/85 76423 *Date to State Via Drilling: 09/04/85 REFERENCE: SOHIO OPEN HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- SFO/UNIT/STATE: S-18 DIL/SFL 08/08/85 & #1 3052-11630 Sch 5" & 2" 08/11/85 #2 11632-12114 S-18 BHCS 08/11/85 #2 11632-12080 Sch 5" & 2" S-18 LDT/CNL-Poro 08/11/85 #2 11632-12117 Sch 5" & 2" S-18 LDT/CNL-Raw 08/11/85 #2 11632-12117 Sch 5" & 2" STATE ONLY: DIRECTIONAL SURVEYS 7/2/85- Job#: AL785D21 Magnetic Single Shot Directional Survey Date: 8/8/85 Gyroscopic Directional Sur~ey~~~~~8/27/85 Job#: 70760 ~p,. /o G.~ Ce,s O0mmiSsi~echnical D°c~entati°n OAT~ ~m,".~ ~', '~ "=:_, ' ' Records Management SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502~3612 September 12, 1985 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention' Mr, C.V Chatterton Well S-18 (13-02-11-12) PBU Gentlemen: Enclosed in duplicate, is Form 10-407, Well Completion Report, for the above named well together with the Daily Drilling Reports, Well Logs and Directional Survey. This well has been completed as a non-perforated oil well. Yours very truly, SOHIO ALASKA PETROLEUM COMPANY R. S. Allan District Drilling Engineer RSA :MSS' kkm 09l 085-0699N Enclosure CC' A. C. Clark, MB12-4 Well Records, LR2-1 Drilling Well File #17 RECEIVED SEP 1 2 Alaska Oil & Gas Cons. commission Anchorage STATE OF ALASKA · ALASKA_ ,_ AND GAS CONSERVATION C6 iVllSSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum Company 84-125 3. Address 8. Apl Number P. O. Box 6612, Anchorage, Alaska 99502 50- 029-21156 4. Location of well at surface 9. Unit or Lease Name 2314'SNL, 711'EWL, Sec. 35, T12N, R12E, UPM [ VERIF~D ' Prudhoe Bay Unit At Top Producing Interva~ Zone 4 (Top IVI/SAD) Surf. _~__~ 10. We~ Number 1044'NSL, 1452'EWL, Sec. 02, TllN, R12E, UPM S-18 (13-02-11-12) PBU At Total Depth - 11. Field and Pool 817'NSL, 1455'EWL, Sec. 02, TllN, R12E, UPM Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Oil Pool KBE=75.29' AMSL ADL 28260 12. Date Spudded 13. Date T.D. Reached 14. Date Co..mp., Su,,sp. or Aba,,--~., I 15. Water Depth, if offshore 16. No. of Completions 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost L2140'MD9095'TVDss 12098'MD9069'TVDss YES ~]( NO [] 2142 feet MD I 2077' 22. TYpe Electric or Other logs Run DIL/SFL/GR; LDT; LDT/CNL; Geo Column; BHCS; CyberLook, CBL; GCT 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20"X30" Insulated~Conducto~ Surface 110' 36" 8 cu._~d. Concrete 13-3/8" 72# L-80 Surface 3055' 17-1/2" 4265 Cu. ft.Permafros! 9-5/8" 47# L-80 Surface! 11650' 12-1/4"2196 cu.ft.Class G wJ.th 8% Gel 230 cu.ft.Class G wi.th 1% FR 7" 26# L-80 11359' 12140' 8-1/2" 375 cu,ft,Class G wi.th 5% KCL 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4 ~>'" 11297' --a t2.6#L~8"] 11411' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 9-5/8"x13-3/8"An:~ulus 282 cu. ft. Permafrost C Down squeeze followed by Arctic Pack 27. PRODUCTION TEST Date First Production ' I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO 'TEST PERIOD Flow Tubing :Casing Pressure CALCULATED,~ OiL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~ 28. COP E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED SE? 1 2 AlasKa Oil & Gas Cons. CQmmjssi°n Ap. ch0rage ., Form 10-407 - Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. SS Sag River ss 11668' 8784' Shublik C 11815' 8885' Zone 4 11844' 8980' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct tO the best of my knowledge Signed .- . Title Drilling Engineer Date ~ ! ~- -- INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1'.Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". AK United 2 Well' S-18 {13-02-11-12) 0600 Depth: O, Day: 0 24-Hr. Ftg: O' Water Used: lO0 AFE #: 11 SOHIO DAILY DRILLING REPORT - PBU CURRENT OPERATION' MOVED RIG TO S-18 Moved rig to S-18. 7/25/85 0600 Hrs. MUD TYPE' WT' SURVEY MD VIS' PV: YP: FL' ANGLE DIRECTION TVD SECTION SOLIDS: TEMP.' COORDINATES DLS RECEIVED SEP 1 2 !~B5 Alaska Oil & Gas Cons, Commission Anchorage SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION: RIGGING UP ON S-18 Well: S-18 (13-02-11-12) Rigging up on S-18. 0600 Depth: 0 Day: -1 24-Hr. Ft§: O' Water Used: 200 AFE #: l14835 7/26/85 0600 Hrs. MUD TYPE: WT: SURVEY MD VIS: PV: ANGLE DIRECTION YP: TVD FL: SECTION SOLIDS: COORDINATES TEMP.: DLS SOHIO DAILY DRILLING REPORT - PBIJ AK United 2 CURRENT OPERATION: DYNADRILLING Well- S-18 (13-02-11-12) Accepting rig at 0600 Hrs. on 7/26/85. Spud 0600 Depth: 770' S-18 at 1700 Hrs. on 7/26/85. Drilled to 450'. Day- 1 POH for Dynadrill. RIH and directionally drill 24-Hr. Ftg: /lO' to 770'. Water Used: 2400 AFE #: l14835 7/27/85 060D Hrs. MUD TYPE: WT: 8.9 VIS: 155 PV: YP: FL: SURVEY MD ANGLE DIRECTION TVD SECTION SOL I DS: COORDINATES TEMP.: DLS SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION: POH for B.H.A. Well: S-18 {13-02-11-12) Dynadrilled to 967'. POH. LD Dynadrill. RIH 0600 Depth: 1932' and drill to 1645'. POH for Dyandrill. RIH Day: 2 and Dynadrill to 1932'. POH. 24-Hr. Ftg: 1162' Water Used: 2500 AFE #: 11 4835 7/28/85 0600 Hrs. MUD TYPE: WT: 9.2 VIS: 80 PV: SURVEY MD ANGLE DIRECTION 4 1037 16.1 ° S12.8°E 6 1401 20.7° S12.0°E 8 1800 30.1 ° S16.3 °E YP: FL: TVD SECTION 1 031 61 1377 172 1 741 334 SOL IDS: COORDINATES S 60'/E 11' S170'/E 36' S329'/E 70' TEMP.: DLS SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION' RUNNING 13-3/8" CASING Well' S-18 Il3-02-11-12) Pick up jetting BHA. RIH and drilled to 3065'. 0600 Depth' 3065' POH. Running 13-3/8" casing. Day- 3 24-Hr. Ftg' 1133' Water Used- 2100 AFE #- l14835 7/29/85 0600 Hrs. MUD TYPE: WT: 9.4 VIS: 75 PV: YP: FL: SURVEY MD ANGLE DIRECTION TVD SECTION 10 2203 39.7 ° S14.0 °E 2073 557 1 2 2544 43.2 ° S10. 0 °E 2327 782 1 5 301 5 48.6 ° S 7.2 °E 2665 1110 SOLIDS: COORDINATES S 549'/El 29' S 771 '/E175' S1097'/E21 6' TEMP.' DLS SOHIO DAILY DRILLING REPORT - PBU , AK United 2 CURRENT OPERATION- DRILLING Well: S-18 (13-02-11-12) Ran 78 its 13-3/8" casing to 3055'. Cemented 0600 Depth: 3250' with 4590 sks Permafrost. Bumped plug. ND dj- Day: 4 verter. Did 100 sks top job. NU wellhead and 24-Hr. Ft§: 185' BOPE and tested. PU BHA and RIH. Tested casing Water Used: 2100 to 3000 psi. Drilled floats and lO' new hole. AFE #: 114835 Ran leak off test to .74 psi/ft gradient. 7/30/85 0600 Hrs. MUD TYPE' WT' SURVEY MD 9.0 VIS' 33 PV' 33 YP' 5 FL' 15.2 SOLIDS' 3 TEMP.' ANGLE DIRECTION TVD SECTION COORDINATES DLS SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION: DRILLING Well' S-18 (13-02-11-12) Drilled to 3460'. Trip for bit. Drilled to 0600 Depth: 4859' 3598'. Trip for BHA. Drilling at 4859'. Day: 24-Hr. Ft§: 1609' Water Used: 1600 AFE #: 114835 7/31/85 0600 Hrs. MUD TYPE: WT: 9.2 VIS: 32 PV: SURVEY MD ANGLE DIRECTION 1 6 31 88 50.1 S 8.1 °E 17 3390 51.7 S 8.2°E 18 361 7 46.4 S 4.0 °E 1 9 3953 45.4 S 2.1 °E 20 4417 44.1 S 1.2°E 7 YP: 1 FL: 14.6 SOLIDS: 6 TEMP.: 69°F TVD SECTION COORDINATES DLS 2774 2905 3053 3287 3616 1241 S1227'/E 234' 1398 S1382'/E 256' 1569 S1553'/E 274' 1810 S1794'/E 287' 21 36 S21 20'/E 297' ~K United 2 4ell' S-18 (13-02-11-12) ]600 Depth' 6275' )ay ' 6 ~_4-Jlr. Ftg' 1416' 4ater Used' lO00 IFE #- 114835 SOHIO DAILY DRILLING REPORT - PBU CURRENT OPERATION' DRILLING Drilled to 4984'. Trip for bit. Drilled to 5928'. Trip for bit. Drilling at 6275'. 8/1/85 0600 Hrs. 4UD TYPE' SURVEY 21 22 23 WT: MD 4883 5379 5856 9.2 VIS: 36 PV: l0 YP: 5 FL: 8.3 ANGLE DIRECTION TVD SECTION 44.3 S .5°E 3950 2461 45.1 S .8°E 4303 2809 46.3 S .5°E 4636 3150 SOLIDS: COORDINATES S2445'/E 301' S2794'/E 306' S31 35'/E 309' 6 TEMP. · 74 °F DLS AK United 2 Well- S-18 (13-02-11-12) 0600 Depth' 7716' Day' 7 24-Hr. Ftg' 841' Water Used' 1600 AFE #: 11'483~; SOHIO DAILY DRILLING REPORT - PBU CURRENT OPERATION' DYNA DRILLING Drilled to 7032'. POH. RIH with Dynadrill and RIH. Dynadrilling at 7116'. 8/2/85 0600 Hrs. MUD TYPE: SURVEY 24 25 26 WT: 9.3 VIS: MD ANGLE 6327 48.1 6798 47.9 6956 47.1 35 PV: 6 YP: 3 FL: 6.8 DIRECTION TVD SECTION S .5°E 4956 3494 S .9°W 5271 3844 S 1.6°w 5378 3959 SOLIDS: 6 COORDINATES S3481'/E 312' S3831'/E 311' S3947'/E 309' TEMP.' PIT CHK DLS SOH'IO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION: RIH Well: S-18 (13-02-11-12) Dynadrilled to 7163' · 0600 Depth' 80'72' to 8072. Trip for bit. Day: 8 24-Hr. Ft§: 956' Water Used: 1800 AFE #: 114835 Trip for BHA . Drilled 8/3/85 0600 Hrs. MUD TYPE: SURVEY 27 28 29 30 WT: 9.5 VIS: 37 PV: l0 YP: 5 FL: MD ~J~IGLE DIRECTION TVD 7175 45.2 SIO. 7°E 5531 7340 44.6 Sll. O°E 5648 7656 42.7 Sll.4°E 5876 7927 40.3 SIO. 7°E 6109 4.9 SOLIDS: 8 TEMP.: 78 °F SECTION 4116 4232 4448 4653 COORDINATES S41 03'/E 323' S4218'/E 345' S4432'/E 387' S4634'/E 42 7' DLS SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION' DRILLING Well: S-18 (13-02-11-12) Drilled to 8568'. Trip for bit. Drilling 0600 Depth: 8853' at 8853'. Day: 9 24-Hr. Ftg: 781 ' Water Used: 1400 AFE #: 11 8/4/85 0600 Hrs. MUD TYPE: SURVEY 31 32 WT: 9.7 VIS: 41 PV: 15 YP~ 4 FL: 4.6 SOLIDS: 9 TEMP.: 73°F MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 8317 38.4 S 9.3°E 6380 4874 S4852'/E 466' 8475 37.6 S 6.1°E 6504 4970 S4949'/E 479' SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION: DRILLING Well: S-18 (13-02-11-12) Drilled to 9340' 0600 Depth' 9840' Drilling at 9840'. Day:' l0 24-Hr. Ftg: 987' Water Used: 1500 AFE #: 114835 Trip for bit and BHA. 8/5/85 0600 Hrs. MUD TYPE: WT: 9.9 VIS: 37 PV: MD ANGLE DIRECTION 8820 37.0 S 5.4°E 9104 39.6 S 6.1 °E 9420 41.2 S 7.2°E 9743 38.6 S 7.5 °E SURVEY 33 34 35 36 13 YP: 3 TVD 6779 7001 7242 7490 FL: 4.4 SOL IDS: 9 TEMP.: 81~F SECTION COORDINATES DLS 51 80 S51 57'/E 500' 1.0 5356 S5332'/E 51 7' .9 5560 S5535'/E 541 ' .6 5767 S5741 '/E 568' .8 SOHIO DAILY DRILLING REPORT - PDU AK United 2 CURRENT OPERATION' POH Well: S-18 (13-02-11-12) Drilled to 9931'. Trip for bit. Drilling at 0600 Depth: 10520' 10520'. Day: 11 24-tlr. Ftg: 680' Water Used: 1 600 AFE #: 114835 8/6/85 0600 Hrs. MUD TYPE: WT: SURVEY MD 37 9860 38 10206 39 10459 l0 VIS: 36 PV: 12 YP: 3 FL: ANGLE DIRECTION TVD 37.6 S 7.5°E 7582 40.5 S 7.2°E 7851 44.6 S 4.7°E 8037 4.5 SOL IDS: 9 TEMP.: 86°F SECTION COORDINATES DLS 5839 S581 2'/E 577' .93 6057 S6029'/E 605' .8 6228 S6199'/E 622' 1.8 SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION' DRILLING Well: S-18 (13-02-11-12) Trip for bit and BHA. Drilling at llll2'. 0600 Depth: 11112' Day: 12 24-Hr. Ftg: 592' Water Used: 1600 AFE #: 114835 8/7/85 0600 Hrs. MUD TYPE: WT: l0 VIS: 38 PV: SURVEY MD ANGLE DIRECTION 40 10679 46.0 S 5.4°E 41 10868 44.6 S 4.7°E 12 YP: 4 FL: 4.4 SOLIDS: l0 TEMP.: 86°F TVD SE CT ION COORD I NATES D LS 81 92 6385 S6355'/E 636' .7 8325 6518 S6489'/E 648' .8 SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION' DRILLING Well: S-18 (13-02-11-12) Drilled to 11569'. POH for bit and BHA. 0600 Depth: 11569' Reamin§ to bottom. Day: 1 3 24-Hr. Ft§: 457' Water Used: 1100 AFE #: 114835 8/8/85 0600 Hrs. MUD TYPE: WT: SURVEY MD 42 11183 43 11499 lO VIS- 37 PV- 12 YP' 5 FL' 4.6 SOL IDS' lO TEMP.' 86°F ANGLE DIRECTION TVD SECTION COORDINATES DLS 46.5 S 5.1°E 8545 6744 S6713'/E 667' .6 45.7 S 2.2°E 8764 6972 S6940'/E 682' .7 SOHIO DAILY DRILLING REPORT - PBU AK Uni ted 2 CURRENT OPERATION' R.I.H. Well: S-18 (13-02-11-12) Drilled to 11663'. Short trip. CBU. POH. 0600 Depth: 11'663' RU ~hl. and ran SP/GR/DIL. RIH for wiper . Day: 1 4 trip. 24-Hr. Ftg: 94' Water Used: ! [~UU AFE #: 114835 8/9/85 0600 Hrs. MUD TYPE- SURVEY 44 WT' lO. 1 VIS- 39 PV- 15 YP' 8 FL' 4.9 SOLIDS' lO TEMP.' 90°F MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 11621 45.9 S 4.7°E 8848 7062 S7029'/E 687' 1.48 SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION' TEST B.O.P.'s Well: S-18 (13-02-11-12) Completed wi per trip. Ran 293 jts 9 5/8" 0600 Depth: 11663' Casing to 11,650'. Cemented with 1,162 sks Day: 15 Class G w/8% Gel and 200 sks Class G. Bumped 24-Hr. Ftg: O' plug wi th 3,000 psi. Installed and tested 9 5/8" Water Used: 400 packoff. AFE #: 114835 8/1 0/85 0600 Hrs. MUD TYPE' WT- lO. 1 VIS- 39 PV- 15 YP' 8 FL- 4.9 SOLIDS' l0 SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES TEMP.' 90 °F DLS SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION' DRILLING Well' S-18 (13-02-11-12) Tested BOPE. Drilled FC. Tested casing to 0600 Depth' 11860' 3,000 psi. Drilling 8 1/2" hole at 11,663. Day- 1 6 24-Hr. Ftg' 197' Water Used' 1600 AFE #- 11483b 8/]]/85 0600 Hrs. MUD TYPE- WT- SURVEY MD 9.1 VIS- 35 PV- ANGLE DIRECTION 9 YP' 6 FL- 7.8 SOLIDS' 4 TEMP.- 86°F TVD SECTION COORDINATES DLS SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION: P.O.H. FOR LINER Well' S-18 (13-02-11-12) Drilled to 12140'. Short trip. CBU. RU Schl 0600 Depth' 12140' and ran open hole logs. RIH for wiper trip. Day: 17 24-Hr. Ftg: 280' Water Used: 1 400 AFE #: 114835 8/12/85 0600 Hrs. MUD TYPE: WT: SURVEY MD 9.1 VIS: 36 PV: ANGLE DIRECTION 9 YP: TVD 6 FL: 5.6 SOLIDS: 4 TEMP.: 72°F' SECTION COORDINATES DLS SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION: Drill C~fF @ Top of Liner Well: S-18 (13-02-11-12) Ran 19 jts. 7" liner with shoe at 12140 and 0600 Depth: 12140' liner top at 11376. Cemented with 325 sks Day: 18' Class G with 5% KC1. Bumped plug. Set liner 24-Hr. Ft§' O' hanger. POH. RIH with 6" bit and tagged Water Used: ~UU cement at lll07. AFE #: 114835 8/13/85 0600 Hrs. MUD TYPE: WT: 9.1 VIS: 36 PV: 9 YP: SURVEY MD ANGLE DIRECTION TVD 6 FL: 5.6 SOL IDS: 4 TEMP.: 72 °F SE CT ION COORD I NATES DLS SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION' R.U. to LaS D/D.P. Well: S-18 (13-02-11-12) Drilled cement to liner top. POH for 6" bit. 0600 Depth: 12098' PBTD Cleaned out liner top and tested liner to Day.' 19 3000 psi. Cleaned out liner to FC. CBU. 24-Hr. Ftg: O' Displaced well to NaC1. Tested liner to Water Used: ' 1400 3000 psi. POH. AFE #: 114835 8/1 4/85 0600 Hrs. MUD TYPE- WT' 9.6 VIS- PV- YP- FL' SURVEY MD ANGLE DIRECTION TVD SECTION SOLIDS' COORDINATES TEMP. · DLS SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION' Run 4-1/2" tubing. Well: S-18 (13-02-11-12) Lay down drill pipe. Log CBL/GR/GCT. 0600 Depth: 12U9~' PBIU Run 4-1/2" tubing. Day: 20 24-~Ir. Ftg: O' Water Used: 1200 AFE #: '114835 8/1 5/85 0600 Hrs. MUD TYPE' WT' SURVEY MD 9.6 VIS- PV' YP' FL' ANGLE DIRECTION TVD SECTION SOLIDS' COORDINATES TEMP. · DLS SOHIO DAILY DRILLING REPORT - PBU AK United 2 CURRENT OPERATION' Move Rig Well- S-18 (13-02-11-12) Run 4-1/2" tubing. Nipple down BOPE. 0600 Depth' 0I Day' 21 24-Hr. Ftg' O' Water Used' lO'O AFE #' 114835 Nipple up and test Xmas tree to 5000 psi. Displace tubing to diesel. Set and test packer to 3500 psi. Clean pi ts. Release rig @ 2030 hours, 8/15/85. RWS and top drive modifications. MUD TYPE- NaC1 WT- 9.6 VIS- PV- YP' FL' SECTION SURVEY MD ANGLE DIRECTION TVD SOLIDS' COORDINATES 8/!6/85 0600 ttrs. TEMP. · DLS SUB. SURFACE DIRECTIONAL SURVEY ['~ UIDANCE [~]ONTINUOUS ['~"JOOL STATE OF ALAS~ COP? Job Reference No,. 70760 Loa(~ed 8¥; Company so.~o ALASKA ~E'"'PROT,'F,,TTIVI' C,L"llvI"PAN"Y Well Name. s-~8 (?-~' ~, 7~]' ~T...~.~. ?~?~..17_~,~ . Field/Location ~.~o~ SA~..0~. sco.~.. AT,A.gT~A Oat_._~e 27-AUGUST-1985 -Computed By: GCT DIRECTIONAL SURVEY CUSTOgEP LISTING FOR $0~I!] ~6~SKA PETROLEUM CO PRI]DgOF BAY SURVEY DAT~: 14-Al]G-85 · UOi, bOC~%~![)~: ~ANG~i~TIaL- averaqed deviation and azimuth V~i~,iC~?, SECTIOr<~: H'[~IZ, DiS'i', PRoJECtED ONTO A TARG~]T ~Z!MHTH OF SOUTH 4 DEG 0 ~'~IN EAST COMPUT~gTION DATE: 2B-AOG-g5 SOHIO AI,,~.SK~ OE"~RObEi,.J~ C{) NORTB S[.,ODE, ALASK ~ I~..~.[F. Rt~O[,~PEr~ VALUES FOR EVEM 100 FEE SOR-SE~ COU!'~ $~?. VERTICAL VE~TIC~.~b D~VIAT1ON AZ]'.~U~rH SECTIOa SEV DEPT~ DEG M!~'~ D~,G ?lin FEET DEC, 0.00 lO0.nO 200,00 200.00 30o. o0 ,300.00 400. o0 ,~00.0O 5(,)0,00 500,0o 600.00 600,00 700,00 699,91 ~00,~0 '799.,47 900,00 8~8.3~,, 24.71 0 7 ;~ .!8 1. t,! -0.17 ;1.24,,~! 0 o ~f 63 54 W -0.~,5 P24,7:1, 0 Ii S 7 1~ W 0.03 ~2a.71 0 g S a9 5'2 W 0,18 424,71 0 t0 S ~1 10 W 0.40 524.71 0 39 ~ ~3 19 W 0,98 62~.62 3 4$ $ 2 49 E 4.71 724,1.2 6 57 .~ 9 27 E 13,~2 a23,02 10 3~ S ~.3 4~ F 29,81 1000.00 995.77 11 () 0. r) o ii,,, 0 c~ 2, '32 1200.00 1300,00 1,283,30 1400.00 1377,30 1500.0() ~,,470,26 1600.00 1562,82 1700,~0 1653,9~ 1~00.00 1,'7,12,2a 1900.00 920.4,8 !,4 2q S I[3 41 E 50,7.4 1017.03 ~,5 30 S 1,3 27 E 76.43 1!13'0~t 17 11. S 14 35 E 103.94 l,~0a,0t 19 8 $ 14 34 E 134,70 130~,01 ~0 49 S 13 7 ~ 1,6~'26 i394,~7 72 O ,S 11 21 E ~04,75 1a87,53 72 54 S ~0 4~ ~ 242'34 157fl,63 26 5 $ 13 5 E 283.16 1566,ql ~9 57 a 16 7 E 329.25 1752.1,5 32 2000.00 !9!.1.90 2100.00 1994.7~ 2200,00 ~073,f¢a 2300.00 2147.2~ 2500.~0 92~2,51 2600.00 ~364.76 2700.n0 ?435.52 280n.00 ~508.~2 2~00.o0 1a,,t6.61 .~2 45 $ 1.5 15 E 4.32.58 1oi~,47 35 43 $ t4 21 E 487.55 199~.59 40 ~ a 14 1,! E 547.69 2071.,99 ~4 15 S 13 49 E 614.52 2143.47 ,13 25 $ 1,.2 43 E 683.49 2~17.2,2 42 4! s !1 7 F: 750.41 2~,a'7 44 47 ~ 10 51 E 819.02 2~60.'23 a.g 10 S 9 23 ~ ~80.26 2433.~3 ~2 0 ~ 7 ~9 E ~57.28 2506.~i ,44 3~ S 6 57 ~' ~025.19 3000.C0 P650.55 31.0n. O0 2715,55 3~00.00 2779,15 3300,00 ~842.08 3400.00 7903,8q 3500.00 ~966.4P 3600.00 3033,31 3700.00 3102,i9 3800.00 3171.36 3o00.o0 32a, 0.5~ 2~75.36 4S 2~ ~ 7 9 E 1o97.69 2640.P6 50 10 $ 7 47 E 1173.61 2703.~6 50 43 $ 8 6 E 1~50.59 2766.79 ~1 25 S 7 57 E 1328.11 2~28.&0 51 55 S 8 0 E 1406.53 2~9~..13 49 45 S 6 32 F 14~a.41 2958.02 46 50 $ 4 27 ~ 1558.69 3026.~0 46 20 S 3 42 E 1631.~9 3096.07 46 9 S 3 36 E 1703.40 3~5.~7 16 O ~ 3 42 E 177~.59 PAGE 1 DATE OF SUPVE¥: ~4-AUG-85 KEt, LY BUSHING ELEVATION: 75.29 EMGINMER: BEUTLER T OF ~EASURED DEPTH LEG RE;CTAMG(...!L~R COORDINATES HORIZ. ERiTY NORTH/SOUTH EAST/WEST DIST. /~.00 FEFT FEET FEET DEPARTUR~ IZIMUT}~ PEG ~IN 0,00 0.00 ~ 0.00 E 0,00 0,53 0,16 N 0,05 W 0.17 0.51 0,14 N 0,03 W 0,15 0,10 0.05 S 0.27 W 0,28 0,25 0.20 S 0,34 W 0,39 0,37 0,45 S 0.65 W 0,79 2,00 1,05 $ 0,88 W 1.36 2,34 4,80 S 1.13 W 4,93 3,'74 1.3.86 S 0.03 W 13,86 4.34 28,66 S 3.11 E 28.83 2,i2 50.27 $ 8,46 E 50,98 1.06 75.60 $ 14,49 E 76,98 2.26 102.70 $ 21.30 E 104.89 1.52 132.99 S 29.26 E 136,17 2,12 166,04 S 37,50 E 170,23 0,77 202.08 S 45.27 E 207.09 2.20 239,2~ S 52.34 E 244.93 4.20 279,61 $ 60.65 E 286,12 3.90 324.98 S 72'56 E 332,98 1,09 375.01 S 87.70 E 385.13 S 9 33 g $ 10 51E $ 11 43 g $ 12 24 E $ 12 43 g S 12 37 E S 12 20 E $ 12 14 E S 12 35 E $ 13 9 E 1,70 426.47 $ 102,45 E 438.60 ,3,9~ 480,59 $ 116,68 E 494.56 5.54 539,82 S 131.73 E 555.66 1,51. 605.65 S 148,2~ E 623,53 3.64 673,b6 S 164.52 E 693.46 1.80 739.78 S 178.23 E 760.94 1.31. 807,64 S 191.36 E 830.00 2.8q 877,16 $ 204.03 E 900,58 0,79 944.66 S 213.84 E 968.56 4.05 1.01,2,16 $ 222.20 E 1036,26 $ 13 30 E $ 13 38 E $ 13 42 g S 13 45 E $ 13 43 E S 13 32 E $ 13 19 E S 13 5 E S 12 45 g S 12 ~2 E 2.97 1.084.21 S 230,99 1.05 1159,62 S 240.98 0,65 1236.05 S 251.63 1.03 1313.00 S 262.55 0.33 1390.84 S 273.49 4.40 ~468.19 $ 283.79 1.7~ 1542.17 S 290.70 0.33 1614,40 S 295.76 0.38 1696.56 S 300.29 0,4~ 1758.60 S 304.92 1108.55 S 12 1 E 1184.40 $ I1 44 E 1261,40 S 11 30 E 1.338.99 S 11 18 E 1417.t7 S 11 7 E 1.495.36 S I0 5~ E 1569.33 S 10 40 E 1641.36 S 10 22 E 1713.09 S 10 5 g 1.784.84 6 9 50 E NORT'H ~!,,OPE,At,A, SK~ E A $ I! R KD D E P T ~ ~00, O0 3381.42 3306. l..~ 00.00 34~2.~, 3~'77 4300. O0 35~3.76 344~, 47 4400.00 3595,25 4600.00 3738.9a 36(~3.65 [)ATE OW SURVEY: 14-AUG-@5 KEI,~,£~Y BUSBING ELEVATION: EN(;,T.N~E~: BEUTt,,ER 5000,n0 40~4,3!, ,394e,02 5100.00 4095.i1 401~,82 5200.00 4165,~6 4090,57 5300.O0 ,t236,52 410!,~3 5400,~0 4306.9~ 4~31.69 5500,00 4.376,7~ 430~.43 5600,00 4445.~7 43'10.58 5700,00 4514.99 4.439,A9 5~00,00 45a~.01 450~,72 5900.00 4~52,7'0 4577.41, rOb S VERTICAL DOGbEG DE V'TATIi'TN g.Z,I ,~ U'~H SECTI Old! SEVERITY D F G M I {~,i i:,) ~ G tvi I N F'"E g T D g G / 1, 00 6000.O0 4721,01 4a,:i5.72 6~.00.n0 ~.788,6~ 4713.33 6200,~0 4,855.~5 4780.56 6~00.00 4923.19 6400.r%0 a9o0.31 4015.0'2 6500.,~0 5057.50 4~87.30 660o.a0 5i~4.03 5040.34 6700.00 5191.93 5~1~.64 6800.oo 5259.23 6900.00 53~6.~ 5251.39 ~5 5 5 2 ,t6 E 1847.~4 44 45 $ 2 20 ~ 19~7,53 44 36 $ 2 16 g 1987,93 44 27 S 2 i0 F 2057,95 44< 7 S 2 11 ~ 21.27,83 4~ 6 ~ 2 9 E 2197,36 44 ~ $ 2 12 E 2266.88 4~ 29 $ 1 55 E 2336.64 44 33 $ i 28 F 24,06.82 44 28 $ i 15 ~ 2476.84 ,33 .49 ,23 . ,il ,47 .87 ,3.1, ,26 7000.00 ~3q4,4! 5319.1.2 710~,a0 5463.37 5]89.08 7200.00 5534.05 58.5R.76 7300.o0 5604.76 5529.a7 7A00,60 5676.0g 5~O0.RO 7500.00 57~7,g7 5~7~.6~ 7600.00 5890.5° 5745.30 7700.~0 5803.70 5glg,50 7800.00 5967,05 5~92.36 7900.C:0 60~2.37 5967.O~ 4~ 53 $ 1 13 E 2546.91 44 57 $ I 19 'E 2617.46 44 56 $ 0 57 E 268'8.04 45 '~ $ i 5 F 275~,70 a5 2a ~ I z E 2829 59 46 3 g I 31 E 290I.~.9 46 21 $ 1 27 E 2073,36 46 ll S 1 ,:.9 E 3045 56 45 30 S 1 24 F 3!.17,84 46 4& S i 1,3 E 31,,90.44 0.88 0.38 0,2~ 0,42 0.88 0,38 0,17 0,26 0.2~ 0.21. 47 14 $ 0 48 F 3263.37 47 3~ $ 0 32 E 3336.~3 47 40 ~. 0 2 E 3410.80 ~7 44 $ 0 I~ W 348~..54 47 5,3 ~ 0 26 W 355~.4,,4 47 46 $ 0 24 ~ 3632.20 ~7 50 $ 0 30 W 3706.~8 ~7 46 $ 0 41 w 3779.00 4'7 3~ $ 0 42 W 3~52.62 *.7 3~ g 0 43 W 3927.20 0.96 0.62 0.84 0,39 0,51 0,45 0.29 0.13 0,15 75.29 FT i ,52 6,82 1.23 0.69 0.63 0.93 0.44 0.42 0.86 I .00 a:7 a .~ 0 il W 4000,52 45 20 $ 5 i~ E 4072,84 45 6 S JO 5 E 41¢~3.33 44 4,~ S 10 %6 E 4213.57 44 17 S ~0 5g E 4283.15 43 45 S 11 !fi E 4352.1.3 a. 3 1~ S 11 36 E 4420.30 42 35 S 1.1 ~8 ~ 4487.80 42 3 ~ l~ ~6 E ~554.59 41 11 S ~.I 38 F 4620.86 dF..CTA~ GULAR COORDINATES NORTH/SOOTB ~,AST/. ES F bS F';I' FEET HORIZ, DIST. FEET DEPARTURE AZIMUTH OEO 1830.03 S 1900'39 S 1970.76 S 2040,77 S 317,69 E 2065 2110,63 $ 320,34 E 2134 ~180,14 $ 322,99 E 2203 ~249,65 $ 325.61 E 2273 ~319.39 $ 328,26 E 2342 2389.60 $ 330,28 E 2412 ~459,67 $ 331.96 E 2481 309,15 ~ 1855.96 3t2,12 $ 1925,85 314,99 E 1995 77 S S $ 34 $ 80 S 94 S 09 S 51 S ~2 S 97 S 9 35 E 9 19 g 9 4 E 8 50 g 837£ 8 25 g 8 14 g 8 3 g 7 52 g 7 41 E 2529,82 S 333,39 E 2551,69 2600,4.3 $ 335.03 g 2621,92 2671,08 S 336.41 E 2692.18 2741,82 S 337,65 E 2762,54 2812,78 $ 339,17 E 2833,16 2884.4~ S 341.12 E 2904,52 ~956,64 S 342,96 E 2976,46 3028.89 S 344,82 E 3048.45 3101,21 S 346,68 E 3120,53 3173,87 $ 348'36 E 3192,93 7 30 g 7 20 E 7 10 g 7 I E 6 52 g 6 44 E 6 36 E 6 29 E 6 22 g 6 15 E 3246,89 S 349,67 E 3265.66 3320'57 S 350.49 E 3339.01 3304.59 $ 351,02 E 3412.69 ,3468,52 S 350.73 ~ 3486.2~ 3542,64 S 350.2~ ~ 3559.9~ 3616,62 S 349.67 E 3633,48 3690,8~ S 3~9.11 E 3707,30 3764'78 S 348,30 E 3780.85 3838,74 S 347,40 E 3854.43 3912.56 $ 346.46 E 3927.87 6 8 E 6 I g 5 54 E 5 46 E 5 38 E 5 31 E 5 24 E 5 17 E 5 10 E 5 3 E 3986,12 S 385.64 E 4001.08 a058.47 S 347.70 E 4073.34 4178'39 $ 358.26 E 4143.91 4197,90 S 371.24 E 4214'29 4.266.73 S 384.46 E 4284.02 4334,94 S 397.89 E 4353.16 4402,31 $ 411,53 E 4421.51 4469,02 $ 4~5,39 E 4489.22 4635.00 $ 439.20 E 8556.21 8600.0~ S 452,6~ E 4622.30 4 57 E 4 53 E 4 57 g 5 3 g 5 8 E 5 14 E 5 20 g 526£ 5 31 E 5 37 g WELL NAME: S- 18 SURFACE LOCATION: 2b_~' SNL, 711' EWL, S35, T12N, Rlk~. HORIZONTAL PROJECTION NOI~'I'H6000 REF 00007071~0 I~CPtt_E = 1/2000 IN/FT 4000 2OOO -2OOO -4000 -6000 -8000 SOUTH -1000[ -8000 NEST ~ i ~-~--~-H ~-~ ~ i t ~ ---ki--t-'ff~ ~ i i-i--ff--ff~--"ti-H-'f-' ?-i..'"t-'-i--?H--t--i-"--'H-+-*..:'--t-H"H'-'-~'"i-'-:'-~ "I~'-H'-~' ..4-.~-.~-4. i ': ': : :- :' ~ ~ :. i i-.~----.,~-: .4.. ~..~-.i--.i-.4-.i--.-i-~.-.i-,.4-.i.--.i.4--..4--,L-,i-...L----i-.i.-i~.,i-.- -i-i-4....i....-..i-...i-4-,i-;-4-4--i-.i.,-.-L-i-.~,...,i-...-,L4..4-,L- ~½--t--½~- ~-~-~-~4-- --i-; --!-~ ".:-.. q---i-..-~ --H--fi' i ! [ ~+- -.~---~q-..iq--. ~½--i-~--i-~-!.,-. q---i--H--.--i:',---i-~..-~----i-+--~-..b -~.-.i-i-..~-- · 4-~-~4-..~-L~-L-~- -L~-. --~_.L--L~-.~. -£-~..i.J~.I,4.-L-i-~--£-~-~JF.-~.L.L.L-,.-~-L.L~---~L-L.~.. -~..~J ...... ~-i-.-~...4.4.4-..~ .4-. --L4...L ..J.4.-.~-i- .4.-L.~_~. '''' 1_.': ....... ' ............................... -- ....... -'i.'-~-'~;~.-~; 'i-' : : : ?'--i--?-~-?-P.' -' "i"-~ i -~ ~ i~ - ~ ?'?-?'-~'-?~-~.'---r-.'?'?~~ ~.'~'~'~-'?-?-??-~-?"~ ,'"P--'i-'r'..'~; '-*-' .r--P~;-, -,i-4....i-4-. 4-~4J,-,--.L-,i-.'.!-4....l-4.-...L...i-.4....~4..4-...i...-i~ .,L4...4-.4..--.4-.i : : -4~4 -: :4--i--.-.M.i-..,L..~---4-.4..4-.i.-. 4-.i.-4-,i--....i..4~g i 4-.4-.,X-~" i-:-.,~--L..~..,L..: ; ; : : : : : ~ : : : : : : : : : : .. : : : : : ~ : : : : ~ : :'~'~ : : : ~ : : : : : : : , : : : : : : f : ; : : ~ ~ : -.? ...... ie~ i!.:~-:..i_-. !~:i:~-... --- ~~ ~- ~k .:..iL .iii. L ~ ~.:~t:z '...t:~ ~..X._~~:~-_.i£~_~.i': ~-----i~ .b..i.'::iii-:.: ~:i::i::~::!::i::!:i:: ::::::::::::::::::::::: ::~:~::~X~:!-~_.-:. ::-(d-:i:h'~:~..':.L' i:' i.:i i:: i.-_-~j~j: .--..".-;~.:j: i:.~i---i.;~i; :-.i:-i: ~.-.½.ff.i_-. _q~ i :;iii 'b.t--?' 71-T-'-.-"?TTTTT" 'T -:.: '"'..-- -T T TT T" -~ -'TT'.-:-'T-?T'T-?' ~ -T~'~'?.-'"':.-!'"!; ..1'"~ ~t~i~'I~T'T-?-" d'TT'T' KT-?TT" 'd..'- '..-' "'!- T ~V? T' T' '.-:'''' "T"~I"Td"T".:'"T"~-~ '-i'"~'-".'--?-"1--'~-'~'-'i"-~-- '-%'-~'"-~ -~--~----i---?---? --~--- '--.-'---~-'?--~..'-'-~;---.,---?'--"P'- ,--.~-~--~-.~~ ---~-'P---i-~- -4-- -'?--~--- --~---P.-~-~-... -..~---*.-~---;.---~'--.~---';'--.~--~.-- -.-.;--..~.-.~;.--?- -.~"~'"~-'i'- '"~'-i"-~'-"P" -'~'-~"'i'"+--'~ · --~--~.--~-.~.,.-~--~-.~..~....-~----.-'-.-~-~-..~-~.-;.-.~...~-. -.~.-~..~-.~-~...~-~...~.--,-~.-~.~:I..~-.~-~.-~-.-.~-t-~..~..i.~-~.-.~-,..,...~.-~...~...~..~...~...,..~.-...' ....... ~...~-.~...,...I::~.~-.~...~.......~...~--,-.~.I.. ~.-,...~.. · ~.'..-~-r'r'?'??'?-~ ..... ?"..'"'.."'?'-?'"~"?":. ...... r':.-'".~-H-?~-?~ .... r?-~TF?td-"":'"~--~.'..-...-'~-~-?'?r-H'?':-'"?"-?"~-r-F?~'..-':.-' ~"TTT'TT'?TT" '"r'T'T"TT'?.-'T'?-'?'' -~r~?'T-t-.."r".tT~-"t'- -!?-t.-' ?'?TT~ 'd-Tl?~ -rT-'.'..' TT-~ --?T-~-?'T'~d'-T" "'?'?"?'T-m:'-'t"i"" '-t'Td"TT'TT'??' .g--4-1---:-.--'.-q--;-.-..:---~------4---~---~---; .-~----~----i-.-~.---.:-----.:---4--4-~i-;-:*~.;4---?"---..¥--;.'--:~.~.--t-.-~-,.;;-+g-...:.-.:.~.;q-&4...~-~,..4-.4-:4..-,.-:...~...~-..~,..:...:.44..-~-..!-~.4..-;.-.,:- 4,4-4..4..~-~.4:.4...~_. 4-. ,:'...:....~,...,~-..~.:...::..:... ,..:...--:...~.. ;---I---:---:---: .-:--- -.4...'-4-4q...-:'.4.4...;....-4.-i..~)..~..+ .~....4q--14..-!--.iq....i...;.,.~ ~"~'; t ~ ~ ~ ..-' ..-~.44.4...i...I.4.4-..i..:,u ....L..3-..~-4...i-."....;-'....~...!.,, .--.L..i.4..-.~...F-;...~...)...i... -L--'*4--4.4.-.L.L..L--L..,..L.L.L.L4-4.4_L.L.-..-J--.L-ML4-L,I-4.4.--I.4-: ~ -44 i i, 4-;-. '-01~i:~14-,_ .4.4-ML..44...I.;...~ ...... ~.4..4-.-"..~l-Ld--i..-~-4...:4..d-.4-4.4-I...~-.. q-+4'-4-.-l-?'-,;.-~--~---.---~---.s.---~-~--+-s. ¥--4-4.--~-4-.~-~-.;~.-~.-~." --4-. ~ -~*.-~-~---'?--+-~ -i.'-~,-=-'--'- *-- -s-s-*--.*....-~---;--+-.~...-....*.--s--+.+- .?~-??- --~..-.~--~..-?--.i---~:--i---~ -~i!!i;iii'-? '"~'"?"'~'"?'"?' ':'"?"'~'"' -?'"~'"~'":":si!i::!:" ':'"??'-"'"~ -"?-~'~!!!~'!!!! -*.-?:- .--~ ..--~. ???-.~!!.~..-?-~--?-.,--!~!! -~--si ! !~-"J ; ; i i~"'~'"+"?' --~---? .-~--.-~.--I.---~ --;,---.~ - ? .-- i i i i J ~ ! i i -~'"?'"'~"~' '" ~ ~,j J I ~ J !'"'~"-P"?-?- -'P"? -'?-'~ -~L-'~-'~-?'4- q--~-4.--i----i---i---~.--~---i---,--~---~-4---~q----~--~-4---i---.q.-4.4--~ ~-! ~ i~ 4 ! i i4.'.-..i----~.-p.-i. ~.-i ~': '~i-~4--?-"-pl---?'"--.~.---~--.-'.-'..-..-i.--i.q.4..-~..--i-.-~-.-~-4- -;--+4...-~..-i--,~4...~.--.,i-.- q4--¢-i-4..-~-q~-.}...~-.~ +-~.q..4....i-..-~-.-?':-4-~-¢-~-~44.--~. ?-" ~.~ ..~-~-+" &.-- 4.q-4.-+..14---;..;-4... i.~~.-4-..~...i...;--.;~4...~..- 4...~...;...;.-.~4..;.4...~.- .4--4.. L.-A..L-4---¢...~..2.-1....:--.;..4.~...i..-}-.-~.-.&M-~ ...}..-~-.L.. '~-L.~-..~.. -~....&~.~-.-[ '..~. ,.--&.4--L-g-.-..~-.4...~..4--L.4...~..-;.-4... !...~-.~.-.~...~..-,.-.!...~.-4....~ ..... ~..4.-~..-~...i.-~ -.~...-/.-..-~-.. ,_x....L.~....~......i...[...2.._ ..: q--~---i---~--~----~---~-.¢4--~--}.--~--}-,-}--~----;-.-~---~:--;---tq.-.}--¢-:"--~::'q--.}---}-~ ~¢4-4.'.-~- ~¢-~-4-4------~.-}---~.--~.--!--~.-.}-..}---~-.---¢--}--~---,."-.-~--.~---4---~--.}--- ..}...~.-.~-q-.~.-.~..-~--~.4... 14.-.~-..~-44 ~+-t-'t'¢--t-~---~---~-~---t--?".--~-~-~-~--.~----~---~%--~---F-¢--.~-~-~-~-~- .+-~--~ ~-H-~-~-~, ---~----~---~---,.'--~-.,:'---?-:;-.- -~----~---~.-~-.-i.-.~-.-~--~--.~-.-,---~----..:-,.i.--~-.-i---.:-.-,.:-.-~.-.i-.-~.--,:.-.~-.-~---~.-+-,~. -!---~---~'-".?- !.---~ -"F--~---~---t--~-~---~---~--+- ~---}--~---~---t---~---.~-~-~;---t-¢--~---*---~- -.~--.i-.4...~.-.-4..-4-..~.-~--4.-.- ...;..:~..--;...;.. i....,.- .~..4... ~. ..... ;-..,.-4.-..-;-..i.-.~.......,....~ ~; .-;--.;-':-~-&--4---~.---i---+-...---*-..?-.-~.--'~...½.-.'?.-';--.!--'; · - - : I : - : : / ..... · - · : I : : : - : : : ; ' : : : : , : : ' ' : : : : : : : ~ : : , : : ~ : ; : : ' - ....... -%-?---~---?-?---?--~---? ..... t---? .......... ;--4 ........ ~----~---;---* ....... ?-.-;----i----~-;----;----i;---i---. -s-~---~--.~--.]...-?'-.-~-.s-) ....... .*;---*----';---'~---i----~-"~- -¢ '-s ...... .;...;.-.;-..;.. ,~.. ,.. ~.. ~.- ~.-~... *.-.;... '....;..-.;...;.--~-.;...;--- .--.74...;...;. ~...;..f-..*. .... -~--'~'-'i-'-fT--;---~-'"i' '~"-}'-:"'~'"~-'"r i---¢----:----;---:---t---~--~---.;.-+-~_--~---~-- :.---H '--+--i--+--.~-!'--H--H--'----~--~---?i---i-------:---i---~ ....... ~---!--?'-?i---t---.!'---:----:'-l- ~---;-'--r -?'ff-~.---i'--i'--~--' '-+--~-'--?-?'! ....... :" ~-,--!-'-~.----!--i-----'.--!---~--~--1---?+-i--i---~--!--~`-~t--~---?--i-~--~---? --?-i-.-e-i--ff---!---?-~--'-.-H.--~--i--.t--~--i--.i..-~ ...... ?-'!-"*-"d'-'*---i--'~ ........ t--'~'--~--'~ ....... i-"!'-'?--'t--:"~'":."'*"'~"i"'!' :'-~"-'l 8000 -BO00 -4000 -2000 0 2000 4000 6000 SCHLUMBERGER O I RECT I ONAL SURVEY COMPANY SOHIO ALASKA PETROLEUM COM NELL S- 18 F I ELD PRUOHOE BAY COUNTRY USA RUN ONE DATE LOOOEO 14-AUO-SS REFERENCE 000070760 WELL NAME: S- 18 SURFACE LOCATION: 23.14' SNL, 711' EWL, S35, T12N, R12E VERTICAL PROJECTION -4000 -2000' 0 0 2000 4000 6000 8000 I0000 IZO00 ,ii..- i iii i!-~.i~+~~+4_rH~..+½..~i+~._1.4_.4_44_~.._i_~_.44~4_t 1 : ' : r':' ! I : : ! ! ! -T.- i : , ~ :, ~'?."..'?- ~ :- :'T,7: ~-T"T-t-'-T-!': ..'T-I- '"~-T'T,'T,' : :-F'T-T- -F: :-~., '-t' .,-~,, Y-' :-~:., .,-t- ~ :. ~ ~ : ;-? :-~-.-t-r-?-.-t- ~i~i ..+.4-rr.-r-t-tt.-:-:-r-t--t-----~nrrn.~-::.---t-r ~±-...'eh~-tt-.-rt-%rt-;.-t??-'T'N-'!-"-H-T;"?:-i"'H"t'--t--t ~ i -~ .4-;---m-t--...' i, ii ii'.;'! !t!"t-~"i-'.?..e'~ffl ii i iii iit'.;'-b~..~½ ii i ili i i ii i ! i i i ?i ii ~i $ i~ -H ';iii :iii $ i i i .: -' ." ; ; ; -'- i I [ .; :-' i ~ S i.: -'.:::- i :.." . $ } ; '" ..: I .:' i .:' :: .-' -" $ ~ }.:ii ~ :. -: [ :. ~ ..' ~ ~.. ~ :. .: :'.~? ?'.~.? -~? ...... ~*.'".*-~.-'~"T~T':-JrT~..'..~..'-.-~TTT.."-':-, .~-~..~-i i r'..~TT~...~_ri i -~ ii i S i~!-'+~-~-m:-+'iet+-'"?TT.., rT.. ,?~ i :i ~ ~t-.-'f-;~;-i-' .... i i:i:i e: i .:.'x--t;~i, i .~i-i , i-i-;-;-;-;-;-;-;-;-H-..' .+--i _JL~ ._~_L,L.L~-~-,.;.Y~.~4.-~-J~It-i---.;-~- .J--';J,..~.i i i J ~ ~- -J--:-~-J,-J- ;: ~ L~-J-4.-$-~-..4-~"NN.I,.-~-JL4-L....J-L-L! -". -+.+~.?t---H--?,:-.--++++i---H~,--~,--+-~--~+~-~.-~+--~+-.4-++-~ : ~ .-+-?"-+4-~4-~.44-.L:'?;I-~.L-N-4 ! ~i-~-::'-~-~44-;':--::- ..-4-~...~...i ...... .~----.'----?-~-" '----;---,~-"~'--~---,---t ....... ~ ..... ~---~--~--'~--+--t'-'+---;-~---' --+..-;....4-.;--~--~.: -f.,+---.: ...... f-~-+--~--4-.M...~-.~-.+....--~--f--,-.'---~- --?.~..~.-:'.~ --+-?--~----;-~-i-[ ~----[-+-- ':_~ ~L ~ I :.: ..i...i ...... :...i...i...i...l...: ..... ~ ...... i...i...:...-"- '... :..4 ..: .-~.....i-i-4-4---L--b..i.J,-...-4-..-b--i--:-~--:--i-4....L..-.4..4- '~.' ..... :..-L..~-4--.--i..4--i-4- -..~-4--.':-4-- -~-.':--: :.. - :-:-: : l ~ ',- "p... !::L:!::i:::i::: :::::::::::::::::::::::::::: 5T i · '* ~ : ~ ' '*- ~ ". ~': ~ i ~ ' ~ ~ : ~ ~ ~ ~ ~ / ~ :' ~ ~: ~ ! ~ L. i _:_i_ :-. :_~ ~ .-' ::; i '::'~i:" :__L.. _-:i .,' ? T:': :' -':J~T?: :~: ..... :, ,.. ~ ~:-.: A.i 4.--.":.--i- :' ! :.~:_~..., ...:....L..~...i_J, ..1...i.i...: ~ ~ ~ ~ ~ I : ?. ! .: J ....... :.. i...L. '-L4-.:L : ~ ; i...~.-..+..~...~--.~----.+++..~--.,,-.+-~.-+.+....~-~imr~i~,--.~,'.-..;---+-+-d ,': i-+-'?-+'--,-;,--;-+.-*.-1-?'--+-++---*.'.--~-~?'...J--+-+-+.--.:-;---+--+--.;-+-~-++-.;--~----~-~Jr'-+~+--';.--.: ~ ~ ~ I : J : : ; ; : : i : ' : ! ,,-~ ~1,,1~ ~: : : : : : : : i l li!i II ;; i!.i.i..jr..i .i.j..i .... ._i...i_Li..: Li L]..i i. i i ii .:,i i..£_Li..i i2._l_i LLi._i...i_L~.i_L..~_..i.jL_L~_i_~._~.~.L..L.i..~_i_i -T."'?'-'T"T-r"'t'".'t'":'t-"T"' "-t'" .*." ~ "T '. ' 'f" i' ? · T ! T t. i '" · .?-'t.- 'T:'-t m ..'T-t T~ .: ~ ..' -: .: :'T- :*-T 't "T t.-'T i i .-~-! : ?'-. i : ~ : T: ~ : : 'T.- · .-;-.-;-.4-.~-....~...i--*...~-----~;---~..-*---~r--~-~--.~---4 .... 4--~.-.;.-~--~--4.-;--;---4--~- ! i :- : .: 4--,-4,-;-.;--~--;- .-:~.'--4--t--+- .-~.' .'---~---.~--~--4-i ..... ?-'?"i"+'+'d--!.'"'~- .'~-'~ .'~..'"+"+~.'-~-~ .4.-L4.4-L4.4...L..L....L.;.4-;...;:.4-.-}.4-4 ..... ~...}-}-..L--L.4-4-i- .~.-,--.-4-4..4-;_.4..&.~4-.~4-;-;.:..~....4.4.4..-*---t'-}-L4...~-~ .-.¢...¢-.~...,.-'.--~-~-.~..~-~..-....~4..-~-4.'...i..4-;4--: .4..J-i..il..i.i4...L- ,4.44.44..~...~...,-;.4 .... ;4.-.~ .4-_-4_~.;-.4_ ..-.M_~ ~ i-;4----N-Li44-4-4--~. 4-..-;--~.,'-4-4--:;...i--4.4-.LN-4-:..:-N'-...~--44-4...,:"...!.4.4..-,:-4 · 4-..i...i-4--.,-1.4..--[:...;---...44...~..-N..-~.4...i.4 ..... ~...-.'--:4--~..i-P - ! ! 4.-P~-:+:-N-.--I-.:-44--~ .4-.4.-'.'.- f4..+.-f---:.'.4.-:-.--;...~+-.H-H.-.f.-;--.H-i;-i.-+'-+-f4-~..-~ .... -i-+-.¢--~--t...i-~-.-~-i---.--~-~--~-..iq-~--+.+--~-----i----;---.;'-¥-.--+-+.~.:- -+~~-+--!-i-+-?'--+--~-.c-+" ++-: .+.i-?-...?.-l-~-?-.++-4.-+--,:-?-..-?--f-+-.~-e.-?---++-+-.~ff+-+4-?' .... -"!'"!"ti4'-!"!"i'"i ...... !'-'f+ i"t'i'"t 4--.!-- --!r~nnh~+?-..-~~?-.;-4---! ?'!':!'i'?'?"? "t-?t'i"i"i"i'"f-i"i"i'-'t-i'1-i'ff'i'"?""ti'"?ti"'f--t-!'-i .... · 4.44.44...i.4...;.4-...N..-;.-;.--i---N.-.¢----: ..... ~...~...N-..f.¢44-.:-.-~.i.4.-f..[-¢'. +4-4.-.!-44---~-;:'-.+-~--H.--i--.-H---!-f--i.---N.--H---i--.i-i-H--i---f--~-..H ..... .4.4...~...~.4.4.4...~...~ ....... ,.-.~.4.4-,..+.-~..-¢.-.~ ..... ->-¢--.mi.-T..~-~---~-4--. ~.~.-..4--:--4--~-4"---~-,~-¥++--~.-e+-+-e--~--+-+--~--+-.+-.+--5----~---q---i-f-+--5--.-i---.-:--.-?-.f.--/-/--+-+-..-f-.~---~ .... ...L $. L.L.i.4...L 4..-} ...... L4...}-.:-I.. ?...;.4 ..... z..LL..~...,...~...L4.4....4-4-4-4--4-4-4-4-:-I-L4-4-4-.4---L~-4.4-- -:-.4-~.--*-4...;.--~.. ~.-4---~...~ 4.4-~-~-..~.4-~..-~....-4--.~-.~-4-4.=*..-.;.-.:. :.-. : 4-2 .L.;.../,..L..;..L.I X .; ~ ~ ~ ; ¢ ; i- ; 4 .~ ; i ; ; ;; -; ;--;-LI .i 4-;--L-]--L-;-;--L-i-.-;-.L ..4.-..;-4---;.-.;..-i..~..-;-..L4-.-L.~-..~..-.~--P~...;..;.-/,.4 ....... ...~...:,...~...¢-.+...;-.~...;...~...|-...,....,....;...¢..4--+-¢.-4-..~ ...... ~.4-~--.:...';....~-;-.-:,-++-~---~...k.~-,~-4-.4--; .... ~------~.;-.-,.'-~-~-4--.~--F~.`~..+.~.e...~.f~+..~....;..+.+~+..?.+.~*;.~.~s.~?r~.}-~-+..?T~*~.~?~: ........... . . . ...... : . : , ; : : : - : : : ~ : : : : : : , ; : : : ~ ; : ; - : : : , ; : : ~ : . : , . : : . ; : : ; : : . : : · "t"t'-:'-TT' t"?'~'"i'"!-t'"t"rT'T'+"t"T''': ..... t1-Rnn~"-t-'-?:-"?~-r, TTT-r'T'TT" "T'T'TT'.-?T:-"T- 'T'-F-r'-FT-'7-'7'?'"FI'"TT-.T'"T--F-~TT'7'-[-'?'T--r'r'?":'-~'":---! 176. II PROJECTION ON VERTICAL PLANE 176. - ~S6. SCI:H-ED IN VERTICAL DEPTHS HORIZ SCALE = 1/2000 IN/FT PRLtPHOE ~Y NORTH SLOPE,A!,,ASK~ FOR EVEN .100 FCF, T OF E A S ~] VERTICAl:: VERTI~CAb DFPTH COUR$~ VERTICAb DO,bEG DEVI ATiO,N AZIM[J]'B SECTION SEVERITY D.K',G N.%i"! DM(] MIN FEET DEG/.!O0 8000 820O 8~00 8400 8500 8600 8700 8800 8900 .00 .00 , P 0 , O0 . O0 .00 . O0 . O0 6118,1~ 604P.SJ 6194.95 6110.66 6272.26 6196.97 6349,93 6~7a,64 6428,37 fi353.08 6507,23 643~.q4 6586,97 6511,68 6666,79 ~59~.50 6746.3~ 567.1,03 ~8~5,94 6750,65 40 15 $ 11 23 ~ 4685.t. 8 1,29 ~9 31 S 11 S E 474~8.66 0,47 39 15 $ 10 30 ~ 481~,64 0.47 38 4A $ 9 35 ~ q874..2~ 0.8~ 38 0 S 8 18 F 4936,06 1,08 37 37 $ 6 40 E 4997.42 1,83 30 55 g 5 25 E 5057,74 0,40 37 11, S 5 38 F 5117.95 0,50 37 1~ S 6 ~.7 ~ 5~.78,55 0.65 37 2g a 5 53 ~ 5239.00 0.73 9000 9!00 920n 9300 94,00 9500 9600 9700 9800 9~00 . O0 .00 .00 .00 .00 , O0 .00 6904,80 6~29,60 69~2,63 6~)07.33 7059.00 6983.71 7134.3~. '705~,02 7208,87 7~33.5~ 72~4,1~ 7~08.90 7360.60 7~85,3i 7838.05 7q67,75 75~6,16 7~40,87 75~4,99 751~,70 38 25 ~ 5 28 E 5300.36 1.02 39 3~. S 5 46 ~ 5363.23 :1.40 40 45, $ 6 50 g 5427,73 1,09 41 35 $ 7 5~ E 5493.41 1,19 41 3~ ~ 8 !0 E 5559,87 0,88 4() 39 5 8 { E 5625.48 0,9,4 ~9 40 g '7 5& F 5689,82 ~8 56 S 7 5S ~ 575~.93 0,56 38 1~, S 8 2 K 5815.~1 0,80 3'7 5~ $ "7 45 F 5~76.59 0,58 0000 0100 0900 0300 040O 0500 0600 0700 0800 0900 .O0 ,00 .00 .00 .00 .CO . o0 .00 .00 7673,45 759~. ~ f,, 7751.09 7675.~0 78?7.63 775.9.34 7903,07 7827,78 7976,5~ 7801,.27 g047,84 707P.55 ~1~7.4l 8047.1.2 81~6.0a 8~11.35 9256.i~ 8~.8~ .!.2 ~377.04 8~5t .75 38 42 ~ 7 3~ ~ 593~.46 0,57 39 3~ $ 7 27 F 6001,37 1,16 40 30 S 7 7 E 6065.63 0,91 aJ, 4~ ~ ~ 42 K 613~.1.6 1.81 43 36 $ 5 56 K 6i9~.92 45 25 S 5 10 K 6269.02 1.'70 46 7 S 5 34 E 0340.85 0.28 46 4 $ 5 49 ~ 641~.96 0,53 45 23 $ 5 55 E 6434.56 0.83 44 51 S 5 24 ? 6555.33 0.53 1000.00 g3~7.62 8322.33 1~00.00 ~467,31 ~392,02 1900.00 8536.21 8a60,92 130n. O0 8604.3~ ~52o.09 laO0.O0 ~672.~g 8597.60 1500.nO 8742.06 1600.00 8811.78 8736.49 1700.00 88~1.65 8~06,36 1800.~0 8950.22 8974.93 190~.00 0017.78 45 2~ g 5 1,1E 6626.~5 0,66 46 7 $ 5 17 F 6697.83 0,53 a6 46 S 5 8 ? 6770.26 0.44 47 15 S 4 44 K 6843.45 0.BE 4.5 37 ~ 3 42 ~ 6916.30 1.83 45 56 S 2 3~ ? 6988.49 0.93 45 40 S 1 4~ ~ 7060.1.5 0.B0 46 ~ $ 0 35 ~ 7131.6! 1.85 47 1 S 0 i,~ ~ 7204.~5 0.77 ~ 13 S 0 29 E 7~7~.g~ 1,73 PAGE 3 DATE OF 80RVEY: 14-AUG-85 KELLY BUSHING ELEVATION: 75.29 FT ENGINEER: BEUTbER ~EASU'RED DKPTH RECTANGULAR NORTH/SOUTH FEET COORDINATES HORIZ. DEPARTURE EAST/WEST DIET, AZIMUTH FEET FEET DE~ 4664,05 4:726.82 4789.12 4851,13 4912,39 4973,13 5033, 7 5093.33 5153,63 52~3.77 465,74 E 4687,25 $ 5 42 g 478.24 E 4750,95 S 5 46 g 490.14 E 4814,14 8 5 50 E 501,20 K 4876. 9~ $ 5 53 g 510.9! E 4938,89 8 5 56 E 518,99 E 5000,34 $ 5 57 E 525,16 E 5060,69 S 5 57 E 530.86 E 51~0,92 S 5 57 E 537,20 E 5181,55 S 5 57 E 54,3.72 E 524.2,05 S 5 57 g 5274.86 5337,46 5401,62 5466.87 5532'83 5597,96 5661.8~ 5724,~8 5786,30 58,47,24 S 549.70 E 5303,42 $ 5 56 g S 555,79 E 5366.32 S 5 56 E S 562.84 E 5430.87 S 5 56 E S 571.34 E 5496'65 ~ 5 57 E, S 580.79 E 5563,23 $ 5 59 E S 590.08 E 5698,,97 $ 6 1 ~ S 599,09 E 5693.43 $ 6 2 E S 607,8~. E 5756,66 S 6 3 E S 616.51 E 58]9.05 S 6 4 E $ 625.0~ E 5880.55 S 6 6 g 5908,69 5971,17 6035,01 6100.15 6167.55 6237,35 6308,88 63~0.67 6451.93 6522.37 $ 633.20 E 5942.52 S 641.46 E 6005,52 S 649,63 E 6069.8~ S 657.57 E 6135.~9 S 665.03 E 6203.30 S 671.7~ K 6273,42 S 678.60 E 6345.27 S 6~5.76 E 6417.42 S 693,19 E 6489,06 S 700.2~ F 6559.85 6592.91 6664,31 6736.~7 6809.38 6882,02 ~954,12 7025.76 7097.29 7170,07 7243,79 706.73 ~ 6630.68 $ 6 7 E 713 3] F 6702,37 S 6 6 E 719[94 E 6'174.83 ~ 6 6 ~ 726,30 E 6848,00 $ 6 5 E 731.74 K 69~0.81 6 6 4 E 735,57 g 6992.91 $ 6 2 E 738.28 E 7064.45 S 5 59 E 739.84 E 7135.75 S 5 57 E 740,39 ~ 7208.20 S 5 53 E 740,75 F 7281.56 S 5 50 E C.FI~qPUTATION DATM; 23-AOG-~5 PAGe; 4 .$,-18 ~ORT8 ,SI..,OPE,Ar,A.SK/1 OATE O~ SURVEY: ]&-AUG-85 KEbLY BUSHING EL.F..VATIOM: 75.29 PT iM'%'MRPULATED VALUF. S FOR EVEN 100 FEET [)F' ME,:~.SURED DEPTH T~Ut7 ,,cUB-SE,~ C, OUR5~; gASI.IRFO, 'g~RTICA~, VEnTIC~,L DF'VTA"PlOf~i DEPT}: OF~PTH DEPT.b' D~G MTN D~G ~,~'I'N VgRTI'CAb DOGbEG R,F,',CTANGUbA, R COORDINATES HORIZ. DEPART[IRE SECTION SEVEP, ITY NORTH/SOUTH EA,$T/WEST DIMT. ,AZINI,JTH FEET DE,C,/~,, O0 fEET FEET F~ET 2000,00 90:q2,98 9007,69 50 2~.~ 2100.00 9145. "/.I. 90'70,42 51 10 2140.00 q170.70 9095,41 51 10 7353,50 7431.30 7462.49 2,00 73J9,58 $ 7411.80 g 7357,07 $ 5 47 g 0.00 7397,46 S 743.40 ? 7434,7~ S 5 44 E 0.00 7428,68 $744.06 E 7465,85 $ 5 43 g COMPUTATION DATE ~OR'T'~'i' SLOPE;, A~' ¥'~RT I .r', Al,, DEPTEt I~!'TERPOLATEiD VALUFS FOR EVEN 1000 DEV TATIOf'~ AZI~UTH SECTION DEG MIl';; DEG ~,!tIN FEET 0.00 1000,00 2000.~0 3000.00 4000.00 5000.00 6000.00 7000.00 8000. O0 9000,00 0.00 995, '77 2650.65 33.10..'~ ]. 4024,31 47..9.. 1 539¢~. 6904.89 V E ~ T T C ~ L 0 0 N 0 0 F 0.00 32 45 S ]5 15 E 432.58 48 2~ $ 7 9 F 1097,69 45 5 $ 2 46 F. 1847,14 44 53 S 1 13 E 2546.91 /$7 14 ~ 0 4.~ E 3263.37 47 4 S 0 11 W 4000.52 40 15 5 11 2! E 4665.1.8 38 25 a 5 '2~ E 5300.36 0000.O0 lO00.a0 2000.00 2140.00 7573.,~5 9170.70 920.48 1936.61 25'75.36 323~.~2 46~5.72 5319.12 38 :~2 $ 7 34 ~ 5038.46 45 24 $ 5 14 E 6626.15 50 28 ~ 1 ! ~ 7353,50 51. 19 g 1 11 E~ 7462.49 759~.~6 9007.69 90d5.41 FEET OF' SEVE DEG/ DATE OF SUR~V'EY', 14-AUG-S5 KELLY P~USNING ELEVATION: ENGINEER: BEUTbER MFASUPED DEPT FG RECTAMGUL~R COOR RITY NORTH/SOUTH EAST lO0 FEET FEE 75,29 .00 0,00 N O, .1~ 50.27 $ ,70 426.47 S 102. ,97 1084.21 S 230. .33 1830.03 S 309. 6~ 2529.~2 $ 333. '96 3246 89 S 349 .5~ 3986,12 $ 345. .29 4664.05 S 465. ,02 5274.86 S 549. DIN~TE$ HORIZ, DEPART /WEST DIST, AZIMUT T FEET DE(; ~I ,57 5908,69 S 633. .66 6592.91S 706, .00 7319,58 S 741, ,00 7428.68 S 744. O0 E 0,00 46 E 50'98 45 E 438,60 99 E 1108,55 15 E 1855,96 39 E 2551.69 67 E 3265.66 64 E 4001,p~ 74 E 4687.2 70 E 5303,42 N 0 0 $ 9 33 S 13 30 $ 12 1 $ 9 35 S 7 3O 8 4 57 $ 5 42 S 5 56 20 E 5942.5~ 8 6 7 E 73 E 6630.68 8 6 7 E 80 E 7357,07 $ 5 4'1E 06 E 7465,65 S 5 43 E FT N COHPUT~TiON O~T'g: NOR'!'[~i SLOr~E,ALASK~ iMTFRPOLATE, D TRU~ SUB-SEa ¥~RTICAL vEr~'rT CA D~PTH . EP I H O.00 0.00 -75. 75.29 75.29 ~75.79 175.29 2'15.~9 275.29 375.~9 375.2~ 300. 4.75.~9 475.29 400. 575.29 575.2q K00. 675.~ 675.~9 775.66 775.29 700, ~76,62 875,29 ~00, 23-AUG-g5 97~.85 975,29 900. 1089.~5 ]075.29 1000. 1186,34 ~175,29 1100. 1~9~,53 1275,29 1200. 1397.~4 1375,29 1300, 1.505'43 ~475.29 1~00. 16~3.57 !575.2~ 1500. 1723.~7 !675.29 1600. 1.~38,46 1775.20 1700. 1956.62 i875.29 lgO0. 100 FEET OF COUP, SE VERTIC.~L DOGL, EG L DEVla, TION AZI~,UT,H SECTION SEVERITY DEG ,HT~,,~ DEG NtN F~ET DEG/IO0 2076.09 1975.29 1000. 270~.~2 ~075,29 2000. 2330.30 2175.2~ 2!00. 2476.~5 2275,29 2200, 2614.g0 2375.29 2~00, 2755.01 2475.20 2~00. 2890,73 2575.29 2500, 3037.~0 2~75.29 2600. 3193.~9 2775.20 270n. 3353.55 2875.2~ 2900. 29 0 0 N' 0 0 E 00 0 7 $ 71 17 W 00 0 12 S 23 9 W 00 0 4. $ 72 5'2 W O0 0 1.7 $ ~4 23 W 00 0 20 $ ~1 37 W 00 3 5 ~ 0 57 W O0 O 6 S 8 ~ E O0 9 38 S .13 7 ~ 50 F 2,3 F :16 E 52 E 4:9 E 5O E 3513.65 2975.29 2q00. 3661.~3 3075,2q 3000. 3805.&7 3175.2~ 3!00. 3050.00 3275.2a 3200. 409~.36 ~375.29 3300. 4~37.~2 3475.2~ 3000. 437~.15 3575.29 3500. 451~.~0 3675.2q 3600. 4650.68 3775.29 370n. 4790.95 3875.29 3800. 00 !3 57 $ 13 00 15 2t $ O0 ~6 53 $ 14 00 18 5O $ 1,4 O0 ~0 4:7 ~ ~3 O0 22 !, S 11 O0 23 14 S 10 00 ~7 ~ S 13 00 31 16 $ ~6 O0 32 21 ~ 15 30 34 E 4, 4 5 F, 27 E 0 E 00 40 13 $ O0 44 27 S !,3 00 42 2~ $ ll O0 a. 4 54 S l0 O0 42 4~ $ 8 O0 44 10 $ 6 ~0 49 1~ 8 7 O0 ~0 41 8 O0 51 52 $ 8 0,00 -0.20 -0.~1 -0.05 0.18 0.29 3.21 I1.07 2~.75 45.55 71.82 99.94 131.99 167.~9 206,77 247,65 293.64 34~.38 409,79 473.92 54~.83 641.68 734.76 829.49 927.12 101~.71 11.26.03 i945.~7 1370.03 1494.76 1602.98 1707.49 181J.55 191~..44 2010.46 210~.43 2205.28 2302.~8 2000.48 6 11 E 3 53 F 3 37 F 3 24 ~ 2 19 E 2 13 ~ 2 11 E 1 29 F no 49 oo 46 25 oo ~6 O0 4,5 42 O0 44 4a S O0 44 30 O0 44 15 $ nO 44 6 00 ~4 17 O0 44 3~ 0,00 0,55 0,50 0,40 0,30 0,46 0,53 3,85 3,39 4'35 3.1,0 0,81, 2,27 1,59 2,14 0,79 2'4:9 4.20 3,14 0,96 3.81 5.59 0,99 1.25 1,15 3,34 4.00 1.59 0.~8 0.62 4,33 0,52 0,39 1.51 0.64 0,42 0,59 0.67 0.49 0.33 PAGC 6 75 2,, RECTANGUb,~R COCIPDI'NATES HORIZ, 14 '"' 'S' . NORTH/SOUTH EAST/, ES1 DI r F E ~ T F E ~ T F f E T DEPARTURE BEG 0.00 W 0,00 E 0,00 0,20 N 0.01, '~ 0.20 0.11 N 0.01, E 0,03 N 0,25 W 0,26 0,20 S 0.30 W 0,36 0,33 S 0.60 W 0.68 0,87 $ 0,79 W 1,1~ 3,30 S 1.15 W 3,49 ~.1.13 S 0.46 W Il,la 24,66 S 2,15 E 24,75 0 0 E 2 45 W 245£ S 56 12 W 60 43 W 42 29 'W 19 18 W 2 21W 4 58 E 45,15 S 7.21 ~ 45.73 71,06 S 13.42 ~ 72,32 98"77 S 20.28 E 100,83 130,32 S ~8,56 E 133.41 165,29 S 3'7,32 F 169,45 204,0~ S 45'68 E 209.13 244.53 $ 53,34 E 250.28 2~9'95 $ 63,12 E 296,74 343.77 S 78.16 E 352,54 404,06 $ 96,23 E 415,36 S 9 4 E S 10 41 E S 12 21 E S 12 43 E S 12 37 E S 12 18 g S 17. 16 E $ 12 48 E 467,16 $ 113.24 E 480.69 540,93 $ 132,02 E 556.8! 632,4.3 S 154.76 E 651,09 724,30 S 175.19 E 745,19 8t7,99 S 193,34 E 840,53 9~4,7~ S 209,83 E 938,47 1005.7~ $ 2~1.41 E ~0~9.80 1.112.37 $ 234.59 E 1136.84 1231.37 S 250,95 E 1256.68 1354.61S 268.36 E 1380.93 $ 13 37 E $ 13 42 E $ 13 45 E $ 13 35 E $ 13 17 E $ 12 55 E S 12 24 E S 11 54 E 5 11 31 E S 11 12 E 1.478.49 S 284.93 g 1505,69 1,,5~6.35 $ 293.80 E ~613.34 1690.64 $ 300.54 K 1717.15 ~.794.49 S 307.21 K 1.820.60 !,894.30 S 31.1,87 E 1919,80 1993,2~ S 315.87 E 2018.16 2091.23 S 319.60 E 2115,51 21R8.06 S 323.29 f P211,81 2294.94 S 376.9~ F 2308,2~ 23a3.25 S 330,1~ F 2406.01 10 54 E 8 10 29 E 5 10 4 E 942£ 920£ 9 0 E 8 41 E 8 8 E 7 53 E FT PRUDHOE i3~Y NORTH ,SLOPE, Ar,,ASK~ C 0 I~TERDO!,,I~TED VALUES FOR EVEN E~SItE!,FD DEPTH D~"PTH V E ~ T ! C A L, COURSm VERTIC DEVIATION AZI~UT,H SECTI 4931.15 39'75,29 5077.00 4075,29 5213.20 4175.29 5354.97 4275,2~ 5~97.94 4,375,29 564~.61 4,%75.29 5787.33 ,4575.29 5933.00 4675.20 6080.~4 47'75'29 6~2~.~7 4875.29 3~00,00 4~,00,00 4~00.00 4300. O0 4~.0o, O0 4500.00 4600.00 4~00,00 44 2~ S i 10 ? 2498. 44 53 S 1 2~ E 2597. 4,4 59 S 0 57 E 2697. a5 13 $ ! ~3 E 2797. 46 3 $ 1 31E 2~99. ~6 1'7 $ 1 27 E 3004. 46 30 $ 1, 26 E 31,0~. 46 49 S 1 6 ~ 3214. 47 3~ $ 0 33 E 3329. 47 38 S 0 ~ W 343~. 6377.58 4975.2~ 6526.36 5075.20 6675,73 5175,29 6823,~3 5275.20 6971.~7 5375.29 71~6.89 5475.29 7~5~,~2 5575.29 739~.~9 5675,20 7537.73 5775,29 7674.~4 5875.2~ 4900,00 5000.00 5~00,o0 5300.00 5~0o.o0 5500.00 5600.00 5700,00 5~00.00 4,7 53 $ 0 25 W 354~., 47 5~ $ 0 24 W 3651. 47 40 $ 0 40 W 376~.. 47 37 g 0 43 W 3871. 47 15 S 0 34 W 3979. 45 ~ $ 6 34 E 4084. 44 57 S ~0 30 E 4184. 44 17 $ I0 58 E 4?82. 43 2~ S 11 2,4, E 4377. ~,2 ~5 $ 11 47 ~ 4470. 7810.29 5975.29 7943.61 6075.29 $074.48 6175'29 8203,92 ~275,2~ 833~.a9 ~375,2~~ 8459.52 6475.29 85~5..~1 &575.2~ 8710,66 6fl75.'2~ 8836.32 6775.~o 806P.~3 6875.2~ 5000.00 6oO0,aO 6100,00 6300,00 6500.00 6600.00 670~.00 6~00.00 41 5~ S 11 45 E 456~. 40 50 $ 11 33 E 4648. 39 37 S 1.1 1~ E 4737. 39 15 S 1.0 29 E 4814. 38 30 S 9 15 E 4894. 37 56 S 7 24 E 4972. 36 5~ S 5 30 ~ 504~. 37 1,~ $ 5 42 ~ 37 10 S 6 15 E 5200. 37 5g S 5 30 E 5277. 909ri.a9 6975.2~ 9921.5,4 7075.29 9354,99 7175.2q 948~.74 7275.2q 961q.07 7375.2~ 9747.79 7475.2q 997K.03 7575.20 0002,~6 7675.2° 0~3~.~7 7775,2~ 0962.9~ 7875.2° 7000,00 '1100.00 7200.00 7~00.00 7400,00 7500.00 7700.00 7800,00 39 26 S 5 42 F 5357. 41 5n S 8 11 ~ 5529. ~0 45 ~ ~ 5 E 5617. 39 27 S 7 55 F 570~. 38 39 q 8 0 E 5782. ~7 54 S 7 52 F 38 43 $ 7 34 F 5939. 39 53 S 7 21E 602~. ~1 10 8 6 54 E 6~06. 23-A, UG-g5 PAGE 7 DATE OF SURVEY: 14-AUG-85 KELLY BUSHING EGEV'ATION: 75.29 VT ENG!NEEg: BEUTSER !00 FEET OF SUB-SEA DEPTH AL DOGGEG RECTANGULAR CO0 O~ SEVERITY NORTH/SOUTH EA$ T DEG/IO0 ~£ET FE RDINATES HORIZ, DEDARTURE T/WEST DIST. AZIMUTH ET F~ET DEG ~IN' 64 0.32 2481,49 $ 332 71 0.4~ 2580'66 S 334 4:1 0,55 26~0.47 8 336 63 0.38 ~780.80 S 338 71 0,38 2852.94 S 341 15 0,15 29~7.45 $ 343 66 0,21 3092.03 S 346 46, .0,39 3197'91 S 348 36 0,37 3305,98 S 350 09 0.33 3415.93 S 350 ,4~ E 2503,66 $ 7 37 E .56 E 2602.25 S 7 23 E ,57 E 2701.51. $ 7 9 E ,44 E 2~01,32 S 6 56 E ,08 E 9903.05 $ 6 44 £ ,75 E 3007'i6 S 6 33 E ,45 E 3111"38 $ 6 23 E ,86 E 321.6,88 $ 6 132 E .35 E 3324.49 S 6 E ,96 E 3433,9! S 5 51E 85 0.26 68 0.36 62 0.56 17 0,06 96 0.7~ 78 5,81 44 0.50 38 0.61, 04 0,69 91 0,77 3526.00 S 350.35 E 3543,36 8 5 40 E 3636,16 S 349,53 E 3652,92 6 5 29 E 3746,44 S 348,52 ~ 3762.62 S 5 18 E 3856.35 $ 347,1~ E 3871,94 $ 5 8 E 3965.49 $ 345,82 E 3980,54 S 4 59 E 4070,34 S 349,0~ ~ 4085,2~ 8 4 54 f; 169.08 S 365,,7~ E 4185,09 5 5 0 E ~265.96 S 384,31 E 4283,24 $ 5 8 E 4360.44: S 403.00 E 4379,03 S 5 16 E 4452,33 S 4~1.9~, E 4472.27 $ 5 24 E 42 0.85 80 0.70 53 0.44 11 0.47 49 1.24 6O 1,00 09 0.5~ 39 0,62 43 0.59 05 1.30 4541.74 S 44,0,60 E 4563,07 8 5 32 E 4628.09 S 458.4a E 4650,7a S 5 39 E 4.7~.0.86 S 475 O~ F 4734,76 S 5 45 E 4791.56 S 490~60 ~ 4816,~1 $ 5 50 E 4871,16 $ 504.54 E 4897.22 6 5 54 E 4948.66 S 515.99 E 4975.45 $ 5 57 E 5094.66 S 594.33 F 505~,94 S 5 57 E 5099.74 S 53~.50 ~ 5197,36 $ 5 56 E 5175,40 S 539.61 ~ 5203.45 S 5 57 E 5251.65 $ 547.48 F 5280,~! $ 5 57 E 18 1,39 8O 1,03 g8 0.34 81. 0.95 96 1.0~ 81 0.70 ~8 0.44 9~ 0.58 45 i.ll 71 1.11 5331.44 S 555.19 ~ 5360,27 $ 5 56 E 541.5,6~ S 564.56 E 5444.96 S 5 57 E 5503.17 S 576,51 F 5533.29 6 5 58 E 5590.34 $ 589.00 ~ 5691.29 S 6 0 E 5673.87 $ 600.77 E 5705.59 S 6 2 E 5754.~4 ~ b11.95 ~ 5786,59 S 6 4 E 5832.04 S 6~2.99 E 5865.2~ 6 6 5 E 59~0.15 S 633.40 E 5944,00 $ 6 7 E 5991.1~ S 644.06 E 60~5.64 $ 6 $ E 6075.85 $ 654,66 E 6111.0~ $ 6 8 f SOHIO ALAS~,~ P~TR~bFO~'~ CO i~TWR°OI,ATf~D VALUES FgR EVE, N 100 FE:~T OF ' COURSF: VERTICAL DO~LEG [~E'V I ~TI, O~ ~ZI X'[iTH SECTION SEVERIq~Y DEG ~'tIN DE(; MTN F'EET DEG/IO0 039e. 0539. 0683, 0826. 0968. 11. I~.. 1~57. 1403. 1547. 1690. 25 r~3 26 51 1.9 ~0 D~PTH DEPTM 43 34 S 5 56 E 6197.72 45 53 $ 5 24 E 6297.19 0.73 46 8 S 5 4~ E ~40~..~5 0,40 45 1'3 $ 5 49 E 6503.61 0,6~ 45 13 $ 5 15 E 6603.60 0'52 t6 I! S 5 17 ~ 6706.~,2 0.55 ~'7 2 $ 4 5~ E 6917.04 0.68 46 36 S 3 3~ E 6919.95 1,97 ~5 49 S 2 10 E 702~.67 0.53 46 ~ $ 0 4~ E 7125.06 1,79 l~3&. 1087. 2140. ~5 O0 7975.29 7900.00 8(}75.2~ aO00.O0 ~175.29 8~.00.00 9375.2~ 8300.00 fl475.29 2575.29 8500.00 8675.20 8600.00 a775,29 8700.00 ~7 :17 $ 0 1,2 ~ 7~31.~0 0.85 50 12 S 1 0 E 7344.23 2.39 51 ig ,S l, 11 E 7462.49 0,00 9975.20 8000.00 0075.2~ 9000.00 ~170,70 9095.41 PAGE 8 DATE 0~' SURVFY~ !4-AUG-85 KEf, bY BUSHINC E,bEV,~TION: 75,29 FT SUB-SEA DEPTF! RECTANGULAR CO0~DIN'ATES HORIZ. DE~ARTUR~ NORTH/SO'UT?t EAST/WES:2 DIST, A, ZIMUTN FE I....... FEF'T Dfi, G MIN 6166.36 6265,41. 6368,9~ 6470.89 6570'45 6672,56 6778.0~ 6884.56 69~8.2a 7090.73 $ 664.90 E 6202.10 S 674.41. F 6301.60 $ 684,57 ~ 6405,60 S 695.15 F 6508.1~ S 704.67 F 6608,13 S '71,4,08 E 6710,~7 ,S 723.64 E 6816,60 $ 731.91 E 6923.36 S 736.98 E 7027.0~ $ 739,76 F 7129,21 6 9 E 6 8 E 6 7 E 6 7 E 6 6 E 6 5 E 6 4 E; 6 1 E 5 57 E 7197.08 731,0.30 7428.68 740.49 'F 7235.07 $ 5 52 E 741.63 E 7347.83 $ 5 47 E 7~4,06 F 7465.~5 S 5 43 E GREAT LAND DIRECTIONAL DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY SOHIO COMPANY S-Pad No.18 WELL NAME prudhoe Bay LOCATION AL785D21 MWD Tool Readings JOB NUMBER Lynn Hensl e,.,v NAME TYPE SURVEY Directional ~upervisor TITLE 8/9/85 .../. · DATEt-' 0 11621 DEPTH INTERVAL FROM TO 7/2/85 8/8/85 DATE SURVEY TAKEN FROM TO THIS'IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL We have retained a copy of your survey report in our files for your convenience; however, should you so desire, all copies of the survey report will be forwarded to you on written request. All surveys are kept in a locked file and are held in strictest confi- dence. Additional copies of your survey report can be made from the original .by any blueprint company. RECEIVED Alaska Oil & GaB Cons. Commissio~ Ant'borage G R [.'i: ~'¥ L.. ~ N D D I R E C T I 0 ~ A I._ D R I L L.. I N G ~ I H C C o m p ,,l'b ** t i o Iq; R A i.) I l..J S };] F:' C IJ R g A '1" LJ R E:' I"1,~ t. lq o d .......... ; I~IW Ii) ]" 00 I... R E A L.') I N G S R I'.'.. I!?, I"1,,~: i !.1 h t ..; 75 .. S .P .l:, R E C '~ "' q '" [.. I-,, D 0 I::' ~:. UI-~ V E Y 500 ,, 0 ) D :[ F;.'.I!!:CT I ON F:.'.I!!:I...A'T' :1: Vii!' COOF;~'D I NATES CI...OSL.IFkE DOG I...E:G A N G I... Ii!: F:' R 0 I"1 W Iii: L.. L..-..-H E A D [) I S '1" A N C iii: D G I~l N S d ,~: !;j/'! 00 0 ,, 00 0,00 0 ,, 00 0 ,, 00 0 0 0 0 ,, 000 (::',., .1. ,, :LO.. iii: 6 ,, 4~:)., (::',., ;'".... ,, ()?' Ii!: S ,, .q ~:.', (::',., :J. 6 .O'E. . :L ,, 446 . S "5,, 80 E (~'. ,, 44S .... ,:'/ ,, .4"~ E '::~., .~",,'~'~,.. S ':), ......... :';:;!::~ ::~,.. E S ,, ...~,':.o .. ,... ..;., .L,I .* q .1.?; 50 E ':)7 ,Si,,;':' c: "z !::~'L E .")",o.") (:- ,~:' ,:.',,:) '~ ....... ~ ........ ,.., ,, :.,.,.. .... 7 .1. ,.~ E "~' (' ''') %- ""* "' '"" " ,'~...'-,, . u ," ~,-'l ,~;. S 12 ,, iii 0 E 60, S 9 S .1. i ,, .1. 8 ii!: 61 ,, ,42 S .1. 0 '/?.':? 3 iii: S ,, 878 '2 '20 'S S 9 4 '2 ,,."~ 4 .1. 7 4,... ''~ S 0 2544 4S 2735 43 12 2924 45 6 2234,41 2.1. 59 ,, .1. 2 697 ,, 51 S .1..1. ,, 40 Ii!: 686 ,, 82 S :L 59 ,, 10 E 705 ,, 01 S .1. S 2 ;32 E .1.. 4 .1. 3 .,..,.~.,,.':~ ";,' "~ '7_, ~:,.~ 2..,..':~ ~..5''~ ''~ .,, ......... ':* '~, 783 41 '"~:: .1. 0,00 E 771 ,, 69 S .1. 75. 14 E "~, (~..1. ,, S .1. S' .1. ''~,'. ...... 4 ':7 .1. 'P Ii!: 0 75' 5 :..~ 46 6 75 2 S 9 ]. 46 c;) .1. S 90 S 6 ]. 0 E 90.1. ,, .1. ':.~ S .1. 9 S 44 E 9'-~ .1.. 65 S 1 ':~ 6 ~= ~ ............. ,- ....... '.,¢.~ Iii: 0. '.~~ 2602.S',"~j 2,527.06 :1.045.49 S 6,,50 Iii; .1. 0:3.1. . 97 S 207,,89 E :L 0 ,5 2 ,, 7 () S :1..1. :.';.!S 2:3 E .1.,,.,.~ .'~.1 3015 48 36 3188 50 6 3390 5.1. 42 3617 46 '24 395¥ 45 24 2664.58 2589.29 :1.1.1.1.. 82 S 7..20 E 1097.87 S 215,80 E .1..1..1.8.88 S .1.:i. 7 :J. 4 E 3.870 2777.:..~8 270.1..99 1242.89 S 8~.20 E 1227.94 ,(3 23S.S9 E 1249,.92 S .1.045 42 Ii:' 0'.9S1 -,'-' ,c.; 4' 2904,67 ,-."~ ~"~,., '~,~.-o . 38 .1. S 99, S ,.~ S 8 .20 E .1. 383 . 10 S "),,. '-'~,.. '::~,. 75 E .1. 406 .54 :1. 0 28 3 E: 0 .79 ,,. ''~ SO~.~S,S9 2971:3.10 ].,570.65 S 4.00 E .1.553,47 S 27~,96 E 1,577,45 ,(310 0 5 Ii:' 2,,528 3287.21 32]..1..92 1811.83 S 2.20 E 1794.40 S 287.00 F: 1817.21 S 9 5 ].4 E". 0.403 44].7 44 .6 488S 44 18 5~79 45 6 5856 46 18 6S27 48 6 3616.73 3950.81 4303.37 4636.50 4956.51 . ., , , :~541.44 S 1.20 E 2120,,9.1. S 296.70 I.:.' 214]..56 S 7 57 413 E S875.52 S 0.50 E 2445.75 S, S01.51 E 2464.26 S 7 .1. 4]. E 4228.08 S 0.80 E 2794.61 S ~05.'47 E 28.1.1.25 S 6 14 ].7 E 4561.21 S 0.50 E ~1~5.96 S 309.S5 E' S151.:1.8 S 5 S8 .1. F 4881.22 S 0.50 E S481,,52 S S12.S6 E $495.51 S 5 7 S7 E 213,(3.04 2462..1.9 2810.21 3150.75 S495.40 ,. 0.299 0. 085' 0.164 0.254 0. 382 RLi.)HOE S-PAD WELL. NJ:) .1.8 8 9 85 R E C'. 0 R [) 0 F= ~<:> U k"' V t.'.'" Y HI:AS Di'~.I.F:T TR...Vt:.i'~][ IJ SEA ,:~I=C~IC}N DIF;,'EC:TIC}N I'~t::.I...A"I'IVE C'.C)OF:,'DII,.r.-~I'E.,:> CI...C)SLJF~:E DOG I...EG DEF:'"f'H DG i"IN I]I:F"FH. Dli!:F:"t"H DI`(3'I" Ai'.!GL.E I::'F(C)FI WEL. L.""HI!itAI:) DIS'¥'ANCE [)G I';li'.l S 6798 47 54 5271,67 ,5 :1. <76 , 383.844,, :1.,4 S C,.90 W 38:3:1.,5:.f S Sl1,,14 E S8.44,,.1.4 S .4 38:33 E 0.169 ,':.,' ~"~'., ,..,'::' c,' 47 6 ':::.., ,..'~, ''~., 8 .................... 41 ..,'::' L'~ 0 S 1.,-.. '''~ :.'!; 960.0 .1. S 1 6 0 W3947 q ? S" S 08 60 E .S '9 60 0 .4 ,:~c, 4 28 .1. 0 ii:' 0 ~:',., ~:',., 9 7 .1. 75 45 1.,:. ''~ .j'::',..'::i,..";¢ u ~ , J.' .,... ''~ '::' "':"'" 8:3 4:1. 17 6 S ~:"; J. 0. '? <':, E4 .1. 0 '::~ .1. 2 SS "-~ 1.10 E 4117 66 S .4 ''~ 8 ':.~ .1. [it':~ ~;~'::: 8 · ..J ~'9 ...J '~¢' . ., .. ........ . . . .,.. , ., ~:. ., ..... .~... 7 S 4 C) 4.4 "z ;'' ........b 0 ':q':: ............ ":~ 4 L?,',.:il ':" ''~ ...... : o 5,':~.'~ / .......~ ./.1. 7 .1. 4 '::~ ';~ S 4 :....'. S ]. :L 00 ti!: 421 o '::~'."~ S :34 S 0 S E .4 ':~ S S 4 S ',.,. E 0 ... . ..... . . . ..r .., ...... . . .,.... ~, ., ..... ":' .... 656 4 2 4 '2 ~'";-., ,::~"" '?. 5.. ,.. o' S 5. 8. C, 0 , :34 44 !::~ ..... 0 . '.1. ,.... ''~ S ]. 1 , 4 ,";~. E 44:3. S . -~ .... 6 ,..c'~ S 85 , ~-.~ o: E 4450 t 8 S 4 ,..'::i :.~c" 5 E C, . 604 .1. 08 ~''' '60 S S 2':'~ ..... :Z.~ '~,} . . .' 7.; 79., 'J. 8 6 '3. 0 :.i~ . 89 6503 ,. 69 6428 ,, 40 "778 ,, :I. '2 6 ? 02 ,, 8 S 000 o t:~ ' ~?"~ '::: 9 . ; .; 0 '. ,.-..,..,. 6 7967 40 .1.8 83.1.7 S8 24 84 ':" ;., :.37 S6 88 '2 0 S 7 0 9.1.04 S9 S6 9420 4:[ :1.2 7241,6'2 7:1.66,, SS 974 S :38 S 6 7489 ,, S ~;~ 7414,10 9°zO 37 S6 7'= " ~,81.46 .... '::'06 ]. >: :1. 0206 40 S 0 78 50,14 7774 ,, 85 10459 44 S6 8036.48 796:1., :1.9 ................ , ..... 56 "~ E ...' .... ..,. ,..,.-,. *.,. ,::','~ z ,, S ,, ~.:. 0 574 c~ 7 E ,.:o~:1. 71 7 E 58:1.4,,20 S ,, '"' 6059 ,, 4 T.'; S 7,20 Ii!: 607; 0 ,, S 7 ..cs 602 ,, 55 E 6230,4'2 S 4,,70 E 6200,,48 S 620,,28 E '" ~'" ':)'::' S 6386 79 S 5 40 E ;~.~.,6 634 05 E 6521,12 S 4,70 E 6490.06 S 6.45.87 E 6745,,98 S 5,..1.0 E 6714,10 S 665.08 E 6973.61 S 2.20 E 6941.S0 S 679.57 E 706:1..04 S 4,70 E 7028.60 S 684.84 E .1. 0679 46 0 (3191 . 22 81 ]. 5 ,, 9 S i0868 44 36 8324.J. 6 8248.87 .1. :1..1. 83 46 S 0 8544.. 74 8469 ,, 45 J..1. 499 45 42 8763.85 8688.56 1.1.62.1. 45 54 8848. ?.1. 8773.62 5. 770 ,, 38 S ,.:':' S 7 .1. '7. E' 0. , 8. 06.. 58-42,,53 S 5 38 4:1.E 0,,855 6060 40 S ~':; 4':> 2':~ F o 8:39 ..... :~ ~ ,... ,r,.. ;.. ,,,.. ,. if 6231.43 S 5 42 46 E 1,,692 6387,79 ,(3 5 41 47 E 0,,657 65'22..1.2 S 5 40 60 E 0.' 'i3 67.46,,96 ,(3 '5 S9 '26 E: 0 <:>~7~'' 6974.49 S 5 35 30 E 0,,534 7061.89 S 5 SS 54 E 1.069 PRI. JDHC)E S""F:'AD WEI_L NO. 18 D A T A .i. N l I:.1',, I" 0 L A TIE D F" 0 R E VIE N 100 F'" EEi'F [)F S |.JBt' '" o1."-A i)IEF'TH 8 - 9 '.'-85 13 E A,S. T R I..I V I':'] R T ,S I..I 13 S E A 13 D -" T V [) V Iii] I:;<'i" I C A I.. D E F:' T H D E F' T H [) E" F:' T H [) I F' F:' ,, C 0 R R E C T 0 0 .... 7,5 0 0 :1. 00 :i. 00 25 0 0 200 200 'l "~':: 0 0 300 300 225 0 0 400 400 3 o,:' · ,. ,.: 0 0 I'~I:.I...A i' :1: VE COOF':D I NATES F I:;:C113 WFLL.""HFZAD 0 . 00 0 ,, 00 0 ,, 00 O. O0 0.00 0,,00 0 ,, 00 0.00 0 ,, O0 0 ,, O0 500 500 425 0 600 600 525 0 '700 700 625 0 80 :I. 800 72 'ff.; ]. 902 ':.? 00 82 ','5 .'.'.:~ 0 0.00 N 0,,00 W 0 0,,37 S 1,,2:1. W 0 5 ,, 1;!'.'fi S 0 ,, :1. 3 [-: :1. .14,3-4 S .1,,04 E :1. 29. '78 S .."t ,, 0 z, E ]. 005 :1. 000 925 5 ]..109 :1..100 :1. 025 :l. 2:1.3 :1. 200 :1. :1. 25 ]. 3 4 :I. :';i :1. 9 :1. 300 :1. 225 :1. <2 ,6 :1. ~" ~-.. '"> ,..,z' ]. 4 c,.. C,. :l. ,:,".:' ..:. ''~ ..... ,..~':; <:> ,'::," '>'. 52 00 <:' 9 F;O E 80 ,, 2. :1. S ]. 5. ';;' 3 .E i'll") :28 c:- o-? 82. E .... ,~ . ,....~ ..,'.. a.. u .142 ,, ,<38 S :;."i 0 ,. 87 E :l. 7 !3 ,, 85 S :;.:.'; 13 ,, 34 2J.:1.3 2000 :1.925 1:i. 3 ,:.4 4<74.83 S 1:i. 6.20 E: 2'2 :~':? 2 .1 O0 2025 139 26 571;! ,, O0 S :1. 33 ,, '-? 3 E: "~ ..... ~ ;~"> 2 '" 72 ~..37,... ]. 33 6 6 :1.:2-'3 S 156 62 E ,. ~.- 00 .125 ': .... · -"' '~ '~" 2 ':":~ 5 207 3 tS 74,6. '5:1.S '~ ':~:'.,07 ~ .... uO ....... .l: :1..67 Ii:' · 264 -4 2.. 400 - "~,.. ,.,~...,,'x ", ~ ',,... z, 4 3. 7 838 . '~, '?. S :i. 88 . ,..;~ 0 E "~ '" ,:.500 2425 28'~ 38 933 08 c, .... .~ 196.89 E 2600 -~.,:o~ ,,,,,,.,, 321 39 1029.95 S Z07.66 E 2700 262S 370 49 1138.81 S 221.09 E ''" ' o725 424 :54 :1.°~'"-~ z. ~ ~,,. 280.0 ,~.,~,~.7:!. S 237 39 E R U f.) I"I 0 E F 0 R E V E N 100 I::'E:l!i:'r f"l E A S .... ' I '" I '~ -- ., I' t',,t.. VE R T o t.. I:. S E: A MI.') T V D D E: P 'f' I"I D E: F:' 'l" I"t D E P T I"i D :i; F F. -) ,:....,~/~ -~ ,::~"z ,,'. ;3000 ;~ 9 ,,,. 5 S68-4 S ]. 0() S0:25 584 : ............. (.), ...:. X 9 .... '71 S S 00 ,...,... ,.... ,..'"'I "~ "~ ,::~ 6 '? :t. 4112 :3400 S :_'~ :25 71 '2 45 :.'!; 4 S. 700 :'.,~ ,.,,-'. "~.,... ,., -4675 S800 S725 48 .1. S :'4900 :3 o ,'~ ,::: 495¥ 509S r." .").-v / i;:' -,v -~ r~' 5518 4000 '~ 9 "~ ":; 4100 4025 4 '200 4125 · .v~- ! ., 4400 4S25 566:1. 4500 -4425 5804 4600 4525. 5950 4700 4625 6097 4800 4725 6244 4900 4825 639'2 6542 6691 6840 6988 V IL:.' R T :1: C A i... C 0 R I:;.: Ii::.C T I':~ --v 44 41 75 S 794 ,<it S 4 8 '7 '~ 9 :l. 4:1. 41 40 Sc.,* · 40 7132 7274 7414 7552 7689 95S 40 99S 40 :1.054 4:1. 107'5 41 .1..1. 18 4 S 1.1.61 4S :1.204 43 :1.250 46 :1.297 47 1344 47 5000 5100 5200 5S00 5400 49.25 1392' 48 5025 1442 50 5:1.25 1491 49 5225 :1.540 49 5325 1588 48 5500 ~'~'~ ,.-,~,. 16~2 44 5600 5525 1674 4'~.. 5700 5625 1714 40 5800 5725, 1752 ~8 5900. ';~'~' 1789.' , R E L. A T :1: V E: C'. 00 R D I N A 'l" E S I.. I.,, t.. f'l W E I... I....... H Il:: A D 249.4,41 S :.3()1,,96 E "~593,:. ., 06. SS02 .96 E "~/,9"~ :1.0 S ..... ) ,, .,, ..... ,.. .... J~4 12 E ') :791 ~"' 4 ,) ,, ". '"' 289S.. 20 S S06,, <?2 Il:: 2V95..5S S 308.59 E 3098.50 S 310.4S E S204.04 S S09,,94 Il: 3S]..1..57 S S10.88 E: 3420.09 S 311,,82 E 35S0.21S S64:L.SS S S752.32 S 3862.91S 3971.07 S 3:1.2.87 E 314.65 E 3.1.7.28 E 310.70 E 308.31 E 4074.89 4:1.73.95 4270.07 4363,81 4455.29 , S S 316.01 E 334.22 E · 352.90 E 371.43 E S89.81 E :'RUDHOE S'"'F:'AD WELL. DATA NO,, :1.8 :i: N T E R I"" 0 I... A TIE D I::' 0 R f.'"' V E N .1. 00 ,,, . / o U L,,~ E. A D E F' 'l' I"1 F:'EE'f' OF:' '" =, c, -- 8'-9'85 I'"l E A S, D E F:' "f' i"1 · 9 ,.':~ -':.', ,.., i....,,... 7956 ~0,...6 8:Y, 44 "f' R U VIii: F;.: T D E F' 'f' i"1 6000 6100 6200 6500 6400 8471 6500 8596 6600 8 '74 ,~ ..... ; ,:) / (.; ,) · ,,;.. 8848 6800 8976 6900 or. il!.~, SFA D E P T I"i 5<:/25 6025 6125 6:225 67,25 6425 6525 6625 .....'i ~.) I-'2 ('.) / .,'.. %. %. :,,. 9 ]. 0$ 7000 6925 9254 7100 7025 9366 7200 7125 9496 7500 7225 9627 7400 7 'S '25 FID ..."f'Vl} D I t::' F ,, 1822 1856 18 Iii 6 1915 1 c:,., 44 1971 1996 2022 2048 'a ') 76 2.1. OS 2154 2166 "~ .1. 96 2227 9757 7500 7425 2257 9884 7600 7525 2284 .1. 001 S 7700 7,.,'c .,..."~ ,-.-:,., 2 S .1. S 10142 7800 7725 2542 .1.027.4 7900 7825 2574 10410 8000 7925 2410 10550 8100 8025 2450 10692 8200 8125 2492 10854 8S00 8225 25S4 .1.0977 8400 8~25 2577 8425 8525 8625 8725 V E R T' I C'. A I.. t_ .... ;., ';., .... . .,UI'.I'.I::. C 1- 3:;3 S .4 :.'.-.~ 0 ...'.. .~:...' 11120 8500 11265 8600 11407 8700 .,.~]. 8800, .' .. ., . R E I... A'l" I V E C 00 R I} t N A 'l" E S F:' R 0 Ivl W E I... L.. "" H Iii; A D 4542,,69 S 407,, 79 Ii!; .4 '" ''~ ''~ 2'S 25 o.,.., o ,,S 4 ,, 86 Ii!: 4710 '::"::' S .,.~ ,.., ,, ;7.4,.. E 4790,,84 S 455,,59 iii: 4870,6:L S 466,,:[8 Iii: 27 4947,,17 S 48:L.24 ti!: 25 5024,,10 S 484,,46 E "~ ,: '"'" 9 ,'-. 9 ",~ ,'."~ 5 Iii; .,-..,:., ,..,u. 9 7 6 S 2 8 ,:-o ,'-' 4 0 ~'' 2620 2665 2707 275,1 50 .~'.o 7 29 29 S6 40 42 42 45 45 45 44 44 ,..,::¢S,.~ :1.9 S '::' .... :1. 4,9'? 54:1. 6,9.6 S 5,. 9,,. 4 , ''~,.-.. ,.,'::' E 5501,78 S 57,4.54 I!:' 5586 ,, ,"!l;'~ S 5.45 ,, 05 iii: 5670.04 S 555,.76 E 5751.18 S 5828.90 S 5908.10 S 5989.14 S 607.4.70 S 566,57 E 576,.61 E 587, .1. 4 I.:.: 598,08 F 608.42 E 6.1.65.76 S 6264,28 S 6;365.'47 o 6466,.1.6 S 6566.58 S 622.08 E 625.69 E 654.92 E 644.,99 E 652.26 E 6668.58 S 6771.85 o 6875.12 o 6978.69. S ,, 661.05 E 670.61E '682-57 E 681.56 E ', 'RLII~)HOE ,S.-"PAi3 WELl.. NO. 18 D A T A .1: ~'1' E'". R F:' 0 L.. A '1' E D F 0 R E"' U I!: N 10 0 0 F:' E E '1" 0 F i'd E A S U R E D D E I::' T I-.I I.'1-'-'9 '--8 5 M Il!; A S . '¥' R U V E R T S t.J i!.~, S E A I.. I::. I.. T I..IL I::.i'. l H I..') iii; I::' TH 10 0 0 9 9 6 9 21 2000 191 1 18 ;'~ 6 3 0 0 0 2 6 5 5 2 5 8 0 · *... ~,*.. * 1 5000 403 4 S 9 5 9 R E 1... A T .1] V E C 0 0 I:;:. D .1] N A T E S -' "i "' "' ") I::'I'~L. I"1 WELI...'"'HI::.~..A 5,.') 77 S 10 8 6 ,, 7,':, .::., 6000 47¥5 4660 S240.54 S 7000 5 408 !:"; 7; S S S <? 80 ,, 12 S 8000 61S4 6059 4656.6S S 9000 ~ o "~ ,., ,,.. o o ..... ,.~ ~ ,,.. 0 6 8 4 5 '= ''~" ~'' 4 '7 S 10000 7691 7616 5900.00 S 11000 8.4 :l. 7 8 S .4 ":>,._ <::' ,_'=; ,..:.q ,.~ -'~ ,, 07 S S 02 ,, 28 E D [ft x iooo ) 0.75 t.50 2.25 3.00 3.75 4.50 5.25 6.00 6.75 7.50 8.25 9.00 9.75 JO. 50 ii,25 12.00 t2.75 t3.50 -0.75 VERTICAL SECTION SOHIO PRUDHOE S-PAD WELL NO. 18  RADIUS DF CURVATURE MWD TOOL READINGS SCALE ' ! inch = !500 feet DRAWN' 8-9-85 ., ., 1VD 884~ 1MD 116~t ,, ..... ,, ......... 0 0.75 1.50 2.25 3.00 3.75 4.50 5.25 6.00 6.75 7.50 8.25 Departure ( ftx 1000 ) // Notes: All values in feet. Depths shown are TVD] Closure: 7062 ft at S 5 deg 33 min E Bottom hole: TVD 8849 TMD 11621 Magnetic declination: 31 deg 30 min E HORIZONTAL VIEW ~OHIO PRUDHOE S-PAD WELL NO. 18 RADIUS OF CURVATURE MWD TOOL READINGS SCALE : ! inch = 1200 feet DRAWN: 8-9-85 _, 50O I ,3287 ,,, I , I I ,, 1 ''l , , :1 ! :  , , 8036 ~BB49 ,,, , , Suggested form to be inserted in each "Active" well folder to check for timely compliance with our regulations. OPERATOr, WELL NAblE AND NUMBER Reports and Materials to be received by: Date Required Date Received Remarks Completion Report . y~ ~-- /2 -- ~-- ~'/< We~ ~or~ 7~.~ ? -./~ -~~ ~ 1< Samples Core Chips Core Descr~ptSon Registered Survey Plat Inclination Survey Directional Survey Drill Stem Test Reports ~ro~uct~on ~est ~e~orts SOHIO ALASKA PETROLEUM COMPANY SFO ARCO 31 1 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907~ 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 EXXON Date: 08/26/85 TO: PHILLIPS TI/: 76402 STATE OF AK REFERENCE: SOHIO ~IAGNETIC LIS TAPES & LISTINGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- H-4 CH-CNT. 08/04/85 7/3 Sch i770713 S-18 O,H. 08/11/85 f/l&2 Sch f/70740 Tape Pos, i/03482 Tape Pos, f/03481 * EXXON: An Asterisk (*) next to a listing above means you should have received the Tape(s) and Listing(s) directly from the respective service company. Please confirm this. RECEIVED DATE ----/~x- ~z,--[~ / ) Technical Documentation v / ,-. ,~ ;'- :': %' 'i,,;: W- % ~ .... _ _..~.,'~ __ _ :_'7,;~__~-;9~-~'''~'' Recoras Management / / ,,~.~ ni~ & G-~. c:or,-: .2 M'EMORANOUM State of Alaska ALASKA OIL AND GAS CONSERVATION COM~4ISSION TO: 'Co V~ C~terton DATE: August 7, 1985 Chai~m~.k-~ . ~RU: Lonnie C. Smith ~c~('~ FILENO: D.H~.51 Co~8sioner TELEPHONE NO: FROM: Harold R. Hawkins ~,~.-._? SUBJECT: Petroleum inspector-,~':', ~' BOPE Test Sohio PBU $-18 Permit 84-125 Prudhoe ~ Pool Monday, July_ 29..,. 1985: I left Kuparuk Field, subject of another rePori, ~0 ~Ohi~'-~ pa~ No. S-18 Prudhoe Bay to witness a BOPE Test. T witnessed the BOPE Test and there were no failures I filled out an A.O.G.C.C. Report which is attached. In summary, I witnessed the successful BOPE test by Alaska United Drilling, inc. crew on Sohio's Well No. S-18. Attachment 02-00IA(Rev. 10/79) O&G tt4 ~/8~ o Inspector STAT'E OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.E. Inspection Report Date Well Operator ~ O../~/ Weii ,~ ~/~ ~,/~ Location: Sec Drillin~ Contractor.~, ~ 0/ Ri. Location, General Well Sign~/~ General Housekeeping. Rig ~/~ Reserve Pit ~ Mud Systems Visual Trip Tank ~ Pit Gauge ~ Flow Monitor ~/ Gas Detectors f Audio BOPE Stack Annular Preventer Pipe Rams Blind Rams Choke Line Valves -g.,-~--:~. Valve_ .J~TL?~O,~,£ Kill Line Valves Check Valve Test Pressure Test Results: Failures Representative~-~/~/~ /f as ng Set ~ ~ Representative ~//~/~ ACC~LATOR SYST~ Full Charge Pressure ~ ~O psig Pressure After Closure ~ psig /~~ Pump incr. clos. pres. 200 psig ~ mind.sec. Full Charge Pressure Attained: ~ min~ sec. Controls: Master ~/~ / Remote ~/~ Blinds switch cover~ Kelly and Floor Safety Valves Upper Kelly Lower Kelly Ball Type Inside BOP Choke Manifold No. Valves / / No. flanges ~, Test Pressure ~-~ Test Pressure ~ Test Pressure _~---~ Test Pressure J-- Test Pressure Adj us table Chokes ~-fz-~O ~ Hydrauically operated choke ~.~ Test Time / , hrs. ~_~- ~/~-~ Repair or Replacement of failed equipment to be made within ~days and Inspector/ Commission office notified. Remarks Distribution orig. - AO&GCC cc - Operator cc - Supervisor SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502~612 July 24, 1985 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 ATTN' Mr. C,V. Chatterton Wells S-18 (13-02-11-12) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above named well. This gives notice of intention to change the bottom hole location. Yours very truly, SOHIO ALASKA PETROLEUM COMPANY R.S. Allan SAPC Drilling Engineer RSA/MSS/sh 72385: 0505N Enclosures cc' Well File #17 · , STATE OF ALASKA ~' ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL [] OTHER 2. Name of Operator 3. Address 4. Location of Well Surface: Target: Bot. Hole: Sohio Alaska Petroleum Company PO Box 6612, Anchorage, AK 99502 2314'SNL, 711'EWL, Sec.35, Ti2N, R12E, UPM 1050'NSL, 1300'EWL, Sec.2, TllN, R12E, UPM 842'NSL,'1317'EWL, Sec.2, TllN, R12E,' UPM 7. Permit No. 84-125 8. APl Number 50-- 029-21156 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number S-18 (13-02-11-12) PBU 11. Field and Pool Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool Est. KBE- 75' AMSL I ADL 28260 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF' (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans ~ Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state 'all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Change bottom hole location approximately 500' to the South East of the original location as specified by the coordinates shown above. RECEIVED JUL2 5 ~q~ Naska 0il E Gas Cons. commission Anchorage 14. I hereby certify that the foregoing is true'and correct to the best of my knowledge. Signed (~ .~.. ~ Title SAPC Drilling Engineer The space below for Commission use Conditions of Approval, if any: .._oroYed C.o~y Approved by Form 10-403 By Order of COMMISSIONER the Commission Submit "Intentions" in Triplicate Rev. 7-1~0 and "Subsequent Reports" in Duplicate July 31, 1984 Mr. R. H. Reiley District Drilling Engineer Sohio Alaska Petroleum Company Pouch 6- 612 Anchorage, Alaska 99502,0612 Re: Prudhoe Bay Unit S-8 Sohio Alaska Petroleum Company Permit No. 84-125 - Sur. Loc. 2314'SNL, 711'EWL, Sec. 35, T12N, R12E, UpM. Btmhole Loc. 1272'NSL, 956'EWL, Sec. 2, TtlN, RI2E, UPM. Dear Mr. Rei!ey: EnClosed is the approved application for permit to d£z_ the above referenced well. If coring is conducted, a one cubic inch chip from each foot of recovered core is required. Samples of well cuttings and a mud l°g are not required. A continuous directional survey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in.these areas are subject to AS 16.05.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Priorlto commencing operations you m~y be contacted by the Habitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the state is prohibited by AS 46, Chapter 3, Article 7 and the re~lat!ons promulgat'ed thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. PriOr %o · ' b eommenczng operations.you may be contacted y a representative of the Departmeht of Environmental Conservation. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention ~,Ir. R.m.~' Reiley Prudhoe Bay Unit S-8 -2- July 31, 1984 equipment so that a representative of the Commission my be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Ve~ truly yours Chairman of Alaska Oil and Gas Conservation Commission BY ORDER OF %"HE CObi~ISSION be Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of EnviroD~nental Conservation w/o encl. SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET, ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 July 24, 1984 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: WELL S-18 (13-02-11-12) PBU Enclosed are the following documents, in triplicate, along with our check for $100 to cover the permit filing fee. 1. Application for Permit to Drill; 2. Proposed drilling program outline; 3. Proposed Blowout Prevention Diagram; 4. Surveyor's plat showing well location; 5. Directional map. If you have any questions, please call Ted Stagg at 564-5173. Yours very truly, R. H. Reiley District Drilling Engineer MQ4:ckg 71384 Enclosure cc: Well File #17 JUL 2 A~aska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA -'- ALASKA OIL AND GAS CONSERVATION CC..,MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL I~ DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC SINGLE ZONE ~] MULTIPLE ZONE 2. Name of operator Sohio Alaska Pe .troleum_ Company 3. Address Pouch 6-612, Anclx)rage, Alask~ 99502 4, Location of well at surface 2314' SNL, 711' ~NL, Sec. 35, T12N, R12E, ~JPM At top of proposed producing interval (Target) 1435' NSL, 950' ~L, Sec. 02, TllN, R12E, UPM At total depth , ,~ ~ ~ 1272' NSL, 956' .E~L, Sec. 02, T1LN, R12E, UPM 5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no. Est. KBE = 60'AMSL I ADL 28260 9. Unit or lease name Prudhoe Bay Unit 10. Well number S-18 (13-02-11-12) PBU 11. Field and pool Prudhoe Bay Prudh~ 0±1 ~ool 12. Bond information (see 20 AAC 25.025) Type Blanket Surety and/or numbersafeco Tns.. 2975387 13. Distance and direction from nearest town 5T~; of Deadhorse 10miles 16. Proposed depth (MD & TVD) 11716 ' MD - 9112' ~eet 14. Distance to nearest property or lease line East of ADL 28261 950f~t 17. Number of acres in lease 2560 19. if deviated (see 20 AAC 25.050) 42° 04 ' KICK OFF POINT 500 feet. MAXIMUM HOLE ANGLE 20. Anticipated pressures (see 20 AAC 25.035 (c) (2) Amount $~00r000.00 15. Distance to'nearest drilling or completed we. S7 2.2=;c)feet 18. Approximate spud date August 17, 19 84 3'330 psige . Surface 4390 psig@ ~)tq ft. ~'{TVD) Proposed Casing, Liner and Cementing Program SIZE Hole ! Casing 36 20x30 1.7% ]13 3/8 12¼ 9 5/9 7 Weight Insulat~ 72.~ I47~ 26.~ 22. Describe proposed program: CASING AND LINER Grade Coupling .~ Condl ictor L-80 Butt L-80 IButt L-80 IIJ4S Length 80 3048 11200 736i SETTING DEPTH MD TOP TVD I MD BOTTOMTVD Surface ] 11~ 110 Surface 30781 2700 Sur~ace I1123011 8751 I 10OR0~, RS~I ]1716, 9112 QUANTITY OF CEMENT (include stage data) 8 cu. yds. concrete 4175 cu.ft. AS 'TI & 2119 cu. ft. Class G 230 cu.ft. Class G 242 cu. ft. Class G w/18% salt See attached proposed drilling ar~ cc~oletion program. As shown on the the attached directional plat, we are aware of the potential intersection proble~ns which can result frcm the drilling of this well. If during actual drilling operations, one of these intersections is approached within hazardous proximity, the well to be intersected will be shut-in. RECEIVED J U L 2 5 1984 al,,~,b,~ 13;I ~O. ~oe Pnne P_nrnm|c=~inll 23. I hereby certify~e for,~rr~t ,o~best of my knowl~ge Anchorage S,GNED ( ~ i~5 ~ ~ T,TLE Dis~ict Fm~ATE 7- ~' ~q The ~ace below formation use~ ~. ~iley ~ Drill~q _ CONDITIONS OF APPROVAL Samples required t-lYES J~NO Permit number Directional Survey required I APl number ~YES •NO J 5o- o'~.9- Mud log required r-lYES /~'NO Approval d~, SEE COVER LETTER FOR OTHER REQUIREMENTS APPROVED BY ,COMMISSIONER DATE by order of the Commission July 31, 1984 PROPOSED DRILLING AND COMPLETION PROGRAM WELL S-18 (13-02-11-12) PBU Install and cement 80' of 20" x 30" insulated conductor to surface. Drill 17 1/2" hole to 2700' TVD and cement 13 3/8" 72# L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W,P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12 1/4" hole to +100' TVD above the Sag River Sandstone. Run 9 5/8" 470 L-80 Buttress casing to within 5' of 12 1/4" TD and cement in two stages: First stage using Class G cement around the 9 5/8" shoe. The second stage to be downsqueezed in the 13 3/8" x 9 5/8" annulus followed by Arctic Pack. Directionally drill 8 1/2" hole to TD. Run 7" liner from TD to 250' inside 9 5/8" casing shoe and cement using Class G cement with 18% salt. Clean out to 7" float equipment, Change over to 9.6 ppg. NaC1 completion fluid. Test casing and lap to 3000 psi. Run CBL. Run 9 5/8" production packer on internal plastic coated tubing with gas lift mandrels and a sliding sleeve. Set packer +50' above top of liner. A sub- surface safety valve with ~ual control lines will be placed +50' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. Suspend well for perforating subsequent to rig release. Tubing Size: 4 1/2" 12.6# L-80 A/B Mod. Butt. IPC with GLMS. RECEIVED JUL 2 5 !984, Alaska Oil & Gas Cons. commission Anchorage B.O.P..~--$TACK CONFIGUR/LTION 1:5 5/8" TRIPLE RAM STACK ! 5000 PSI WP DRILLING ANNULAR PREVENTER PIPE RAMS BLIND RAMS 2" KILL LINE DRILLING SPOOL CHECK GATE GATE GATE PIPE RAMS 4," CHOKE LINE HYDR. ASST. GATE RECEIVED JUL 2 5 i~84 Oil & Gas Cons. Commission Anchorage J Si,8 (PropoSed} i' PORTION'OF T. !1N.& T. 12N., R. 12E.~ U.M. SCALE: 1":i/2MILE ,,SURVEYQR'S CERTIFICATE ! HEREBY CERTIFY THAT i AM pROpERLY REGISTERED AND LICENSED T° PRACTICE LAND SURVEYING IN THE STATE OF ALASKA, THAT THIS PLAT- REPRESENTS A LOCATION SURVEY TI2N ' TiiN' I OF THE WELLPAD SHOWN AND THE WELLS THEREON. THIS SURVEY WAS MADE BY ME OR uNDER MY DIRECT SUPERVISION, AND ALL DIMENSIONS-AND OTHER DETAILS ARE CORRECT. BOTTOM HOLE LOCATIONS ARE FURNISHED BY OTHERS, ~'i'/IAy. I 1; 15~4__ REGISTRATION NO. DATE REGISTERED LAND SIo'RVEYOR ADDED LOCATION DIMENSIONS FOR WELL S-15 RECEIVE[ JUL 2 5 ]984 Alaska Oil & Gas Cons. Co~ Anchorage YELLS PAD DETAIL SCALE: I": 500' PLANT PAD "S" EXTENSION Located in ~ROTRACTED SECTIO NS ZC! ZT~ 34.~3..5! 2 & :5~TI 2N rTl I N ~.R, 12E, UM Surveyed for SOHIO ALASKA PETROLEUM CO. Surveyed by niss~r~EAN TECHNOLOGY LTD. LAND & HYDROGRAPHIC SURVEYORS 2502 West Norfhern LlghfI.Boulevard Anchorage, Alaska --- CLOSEST APPROACH VERSION 5,5 FOH PROPOSED WELL S-18 ANALYSIS --- COURSE LINE CALC, S-18 , LOCATION : W-E S-N TVD(SBS) TOP 618885.00 597916g.00 -60.00 BOTTOM 619238,85 5972209,7~ 9039,75 NOTE - ALL DEPTHS IN FEET BELOW KELLY BUSHING (BKB) m------.. ---- ------m--------~------ -- '' ' ' ' CLOSEST APPROACH VERTICAL INTERSECTION WELL IDENT /PROPOSED- /NEARBY- CLOSEST /PROPOSED- /NEARBY- VERTICAL TVD DEPART TVD DEPART DISTANCE TVD DEPART TVD DEPART DISTt ~ A69500 S-3 500.0 0,0 511,5 2.1 729,4 A72gO0 S-12 92.9 0.0 100,0 1,3 1419.7 A72~00 S-11 500.0 0,0 509,8 5,9 1317,7 A76500 S-10 500,0 0,0 512,8 1,1 1229,9 A77100 S-9 500,0 0.0 510,8 5,3 1139,2 A77800 S-8 500,0 0,0 51~,4 3,9 1053,6 A71701 500,0 0.0 517,3 8.6 677.7 A69800 S-2 500.0 0.0 A82900 S-7 0.0 0.0 4.9 .0. 974.4 ASIO00 S-13 500.0 0,0 508,1 1,3 1515.~ A83900 S-6 500.0 0,0 520,5 6.4 893.6 A86900 500,0 0,0 519,5 2,6 830,5 A95900 0,0 0,0 .SUMMARY o THE WELL WHICH COMES CLOSEST 512,3 3.5 696,8 11.2 .0 775.7 TO THE PROPOSED WELL IS 2148,2 692.1 5620,5 ' 1632,7 2333,0 859,0 8199.9 1720,1 5859,3 5759.~" 3952.5 8529,0 RECEIVED JUL 2 5 Alaska Oil & Gas Cons. Commission Anchorage A71701 ~'[ ~ CLOSEST APPROACH ANALYSIS --- VERSION 5,5 ~OR PROPOSED WELL S-18 7 DEGREE LEAD LINE CALC, S-18 .OCATION = W-E S-N TVD¢SBS) FOP 618885,00 5979169,00 -60,00 ~OTTOM 620085.10 5972304.87 9039,75 mOTE - ALL DEPTHS IN FEET BELOW KELLY UUSHING (BKB) CLOSEST APPROACH VERTICAL INTERSECTION WELL IDENT /PROPOSED- /NEAROY- CLOSEST /PROPOSED- /NEARBY- VERTICAl_ TVD DEPART TVD DEPART DISTANCE TVD 'DEPART ., TVO DEPART DIST~N ? ~69500 S-3 500,0 0,0 511,5 2,1 729,~ ~72900 S-12 92,9 0,0 100,0 1,3 1419,7 A72800 S-11 500,0 0,0 509,8 5,9 1317,7 ~76500 S-10 500.0 0.0 512,8 1.1 1~29.9 ~77100 S-9 500,0 0,0 510,8 5,3 1139,2 ~77800 S-8 500,0 0,0 51~,~ 3,9 1053,6 A71701 500,0 0,0 517,3 8,6 677,7 A69800 S-2 500.0 0,0 512,3 3,5 696,8 A82900 S-7 0,0 0.0 A81000 S-13 500,0 0,0 A83900 S-6 600,0 2,2 A86900 A95900 ~,9 ,0 974,4 508,1 1,3 1515,~ 623,2 8,1 893,5 500,0 0,0 519,5 2,6 830,5 0,0 0,0 11,2 ,0 S.UMMARY T'MF WELL WHICH COMES CLOSEST TO THE PROPOSED WELL A71701 775,7 IS 20W2,8 597,1 5W63,0 1509,4 3~13,1 2227,7 763,9 7817,8 1587,1 5582,5 RECEIVED JUL 2 5 1B 4 Alaska Oil & Gas Cons. Commission Anchorage - ! I lO 20 t $0 40 °.1 04 Z~7 'l - - . . .::'._-::~ iURVE )R'S CERTIFICATE HEREBY C~JITIF¥ THAT I AM PROPERLY REGISTERED AND :?~.~:_, .: .- -.._ .... - ,ICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ...'ALASKA, THAT THIS PLAT IIIEPRESENTS A LOCATION SURVEY _ 'OF THE WELLPAD SHOWN AND THE WELLS THEREON; THIS ~'~ ~ .;- . .- -:.',.-'~.:$URVEY WAS MADE BY ME OR UNDER MY DIRECT SUPERVISION, :..-...:-..._'.:,_AND ALL DIMENS ONS AND OTHER DETAILS ARE CORRECT, ~' ' .BOTTOM HOLE LOCATIONS ARE FURNISHED BY OTHERS. .~, -L:-'-DATE ~¥'tl;1~- REGISTRATION NO. '/..~, f~l~l ' -" _.REGISTERED LAND VEYOR . I ~1 /'L~T. =70°z~ 0~..~2. / ! ---d--t- --FLON¢~' 44¢-e~04-.'7;7~ ...... , ' I / X= 618,885 Y=5,979,499 ' OI , j ~ ~ ~ j , ...... :~__~ ..... -~ ....... ~ : ............ ~, ........ ~ ....... i, i~ '~ = ~ i I J i . ~S*18 (Propoled) 1 PORTION OF T. II N. ~ T. ~N.~ R. I~ E.~ ~.M.. SCALE: 1"=I/2MILE I ITI~N, TIIN - . ':.RECEIVED ' "'- · ..'-' --- :-"--- ..... :: ....... . ~ 'JUN 1 4 L~4 ._- .... ' ...'.: _" -_:..-_.'.:' -:.:-.~--:! "" '. '; -:';:/. '-"'-i -: .... "--'~ ::: .... "--'".' -' - '" '.'- --..:...' Ataska Oit & Gas Cons.'.' Commi5sk ........ ' ' - .... '- '." .'---'-':'--; .--.:_i:::--":-..-Anchorai~e --.'.'---.i · . ADOED. LOCATION DIMENSIONS FOR .WELI~ 5-15 ':' ':.'-' '- - '"': :'"' '-"-" "': "' ' f~6~tl'l/84 WELLS PAD DETAIL SCALE: I": 500' PLANT -: PAD "S" EXTENSION .;-. ' Locefed In . ~)TRACTED SECTIONS. 26,.ZT,$4,55, Z &:~,Ti 2N,T".IN,RIZ~ UM Surveyed for :' .,.....: _ . SOHIO'ALASKA P ETROLEUM....CO. · II I I I II I _Iii . Surveyed by OCEAN TECHNOLOGY LTD. '" · LAND & HYDROGRAPHIC sUEvEYOR~ ' .L- '2 5 0 ~, West Northern Llghti.Boulevard Anchorage, Alaika' ' _ . . I · Fee !:'-.:(2) Loc .. LIST '(8) (3) Admin~x~.-/ ~-~,f'~¥ (~. thru 11-~-----. /'/,yT-/ (10 'and 11) (4) Cas /7 /{ ?'zT'fV (12 thru 20) · (21 thrd 24') PERMITS. .. I. . 3. 4. 5. 6. 7. 8. . 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. Lease &!:.Well No. .. '~:%, :/. , j,.,, .~..~ . . . YES NO REMARKS · .? -. Is the permit fee attached ......................................... ~ · IS well to be-located in a defined pool ............................. Is ~ell located proper distance from property line ................. .. Is well located proper, distance from other wells .................... Is sufficient undedicated acreage available in this pool ............ Is. well to be deviated and is well bore plat included ............... Is operator the only affected party ................. ; ............... Can permit be approved before ten-day wait .......................... Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed . ' Is conductor string provided ........................................ Is enough cement used to circulate on conductor and surface ....... Will cement tie in surface and intermediate or production strings .ii Will cement cover all known productive horizons ...,..'.. ............ Will surface casing protect fresh water zones ..................... Will all casing give adequate safety in Collapse, tension and burst Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate well bore separation proposed ........................... Is a diverter system required ....................................... Are necessary diagrams of diverter and BOP equipment attached ....... Does BOPE have sufficient pressure rating - Test to .~-~ psig Does the choke manifold comply w/API RP-53 (Feb.78) .................. Additional r~quirements ............................................. ~Z ~-~0 Additional Remarks: GeOlogy: Enginpering: ,.cs .WVA JKT~;/¢~2 HJH ~ JAL~ MTMA' rev: '12/08/83 6. CKLT INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE , , , , , Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effod has been made to chronologicallY organize this category of information. , Alaska u, & Gas Cons, Commls~ L I S'T AP E knchorag~ I'FICATION LISTIN~ LVP OlO.H02 VERIFICATIDN LISTING PAGE 1 ** REEL HE~DER SERVICE NAME :EDIT OATE' :85108119 ORIGIN : REEL NAME :142695 CONTINUATION ~ :01 PREVIOUS REEL' COMMENTS :SCHLUMBERGER WELL'SERVICES CUSTOMER FIELD TAPE ** TAPE HEADER ¢~ SERVICE NAME :EDIT' DATE :85/08/19 ORIGIN :0000, TAPE NAME :0740 CONTINUATION # :01 PREVIOUS TAPE : COMMENTS':SCHLUMBERGER WELL SERVICES CUSTOMER FIELD TAPE ** FILE HEADER ** FILE 'NAME :EDIT .001 SERVICE NAME : VERSION ~ :, DATE : MAXIMUMiLENGTH': 1024 FILE 'TYPE : PREVIOUS FILE : iNFORMATION RECORDS MNEM CONTENTS CN : SOHIO ALASKA PETROLEUM COMPANY WN : S-18 FN : PRUDHOE BAY RANG: 12E TOWN: 12N SECT: 35 COUN: N. SLOPE STAT: ALASKA CTRY: USA MNEM CONTENTS PRES: E ** COMMENTS UNIT TYPE CATE SIZE CODE 000 000 03O O65 000 000 004 065 000 000 012 065 000 000 004 065 000 000 004 055 000 000 002 065 000 000 012 065 000 000 006 065 000 000 003 065 UNIT 'TYPE CATE SIZE CODE 000 000 001 065 LVP OlO.H02 VERIFICATION LISTING PAGE 2 SCHLUMBERGER ALASK,~ COMPUTING CENTER COMPANY = SOHIO ALASKA PETROLEUM COMPANY W~LL : S-18 FIELD : PRUDHDE ~AY COUNTY = NORTH SLOPE BOROUGH STATE = ALASKA JOB N:UMBER AT'ACC:: 70739 RUN ~1, DATE LOGGED: 8-AUG-85 LOP: MO CASING ': 13.375" @ 3055' TYPE FLUID : LIGNO DENSITY = 10'0 LB/G VISCOSITY : 37,0 S PH = 10.0 F~LUID LOSS = 4.6 CB MATRIX SANDSTONE BIT SIZE RM RMF RMC RM AT = 12.25" TO BH'T 11663,.0' 2.5B0 @ 65.0 D'F 2. 290 @ 65.0 DF 2°230 @ 65.0 OF 1,106 ~ 161-0 DF LVP OlOoH02 VERIFICATION LISTING PAGE THIS DATA HAS NOT BEEN DEPTH SHIFTED - OVERLAYS FIELD PRINTS JOB NUMBER AT ACC:: 70740. RUN #2, DATE 'LOGGED: 11-AUG-85 LDP:.MO CASING TYPE FLUID DENSITY VISCOSITY PM FLUID LOSS MATRIX, SANDSTONE 9.625" @ 11650,0' - BIT SIZE = 8.5" TO LIGNDSULFONATE 9.10 LB/G RM = 2.800 2 67.0 DF 35°0 S RMF = 2-880 @ 67.0 DF 11.5 RMC = 2,370 @ 67.0 OF 7"8 C3 RM AT BHT = 1.138 @ 175.0 DF THIS DATA HAS' NOT BEEN DEPTH SHIFTED - OVERLAYS :FIELD PRINTS SCHLUMBERGER LOGS INCLUDED,WITH THIS MAGNETIC TAPE: ~ DUAL INDUCTION SPHERICALLY FO'CUSED LOG (DI'L) ~ DA'TA AVAILABLE:. 12114,0' TO 29'96,0' ~ BOREHOLE COMPENSATED LOG (BHC) LVP 010.H02 VERIFICATION LISTING PAGE 4 =:~ OA'TA AVAILABLE: 1ZO$O.O' TO 1163Z.0' * LI'THO DENSITY COMPENSATED LOG (LD'T) ~ COMPENSATED NEUTRON .LOG (LOT) ~ ~DATA AVAILABLE: 12117.0 TO 11632.0 ~r JOB ~70740 MERGE COMPLETED BY LOP,MOo ** DATA FORMAT RECORD ..- ENTRY BLOCKS TYP DATUM SPECIFICATION BLD MNEM SERVICE SERVICE U ID ORDER # DEPT SFLU OIL ILO: OIL I L M D I L S P OIL GR OiL DT BHC GR BHC GR LOT CALI LOT RHO 8 LOT D~ HO 'LOT NR,~T LDT RNRA LOT NPHI LOT PEF LDT NCNL LDT FCNL LDT QLS LOT E SiZE REPR CODE ENTRY 2 1 66 0 4 1 66 1 8 4 73 60 g 4 65 .liN 6. I 66 0 1 66 0 CKS NIT. API API API API FILE SIZE SPL LOG 'TYPE CLASS MOD ND. PT O0 000 00; 0 0 4 1 OHMM O0 '220 O1 0 0 ~ 1 DHMM O0 120 46 0 0 OHMM O0 120 44 0 0 4 1 MV O0 010 O1 0 0 4 1 GAPI O0 310 O1 O 0 4 1 US/F O0 520 80 0 0 G4PI O0 310 01~ 0 0 4 1 GAPI O0 310 O1 0 0 4 1 IN O0 280 01 0 0 4 1 G/C3 O0 350 02 0 0 4 1 G/C3 O0 356 O1 0 0 4 1 O0 420 O1 O. 0 4 1 O0 000 O0 0 0 PU O0 BDO O0 0 0 4 1 O0 358 O1 0 0 4 1 CPS O0 330 31 0 0 4 1 CPS O0 330 30 0 0 4 1 O0 000 O0 O. 0 4 1 REPR CODE PROCESS (OCTAL) 68 00000000000000 68 00000000000000 68 00000000000000 88 O0000000OO0000 6B 00000000000000 6.8 00000000000000 68 00000000000000 6.8 00000000000000 68 O0000OO0000000 88 00000000000000 68 00000000'000000 68 00000000000000 68 00000000000000 68 00000000000000 68 00000000000000 68 000~00000000000 68 00000000000000 68 00000000000000 68 00000000000000 LVP 010..H02 VERIFICATION LISTING PAGE 5 ~SS, LOT O0 000 O0 0 1 68 00000000000000 DEPT SP GR NRAT NCNL, DEPT SP GR NRAT' NCNL OEPT SP GR NRAT NCNL OEPT SP GR NRAT NCNL OEPT GR NRAT NCNL DEPT GR NRAT NCNL OEPT SP GR N R ,67 NCNL DEPT SP NRAT NCNL DEPT 12141.'0000 -999.2500 18.3955 2'3147 3739.5000 12',100'0000 -46.0195 23.7S49 2.0569 3569,.5000 12000.0000 -58'4570 29.3174 2,2874 3987.5000 11900.0000 -69.0352 22.3486 2,3206 3803.5000 11800'0000 -16.4326 196-9375 2.0022 5351.25'00 11700.0000 -23.3545 61.4805 2.2190 3541.5000 11600.0000 -29.2451 57.9805 4.0320 1403.6875 11500.0000 -32.4883 -999.2500 -999.2500 -999.2500 11400.0000 SFLU GR CALi RNRA FCNL .SFLU GR CALI RNRA FCNL SFL U GR CALI RN R~ FCNL SFLU GR CALI RNRA FCNL SFLU GR. CALI RNR A FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU -999.2500 ILD -999.2500 DT 8.5020 RHOB 2.4827 NPHI 1505,6875 QLS 3-8401 ILO 50.1680 DT 8.619t RHOB 2.1858 NPHI 1677.6875 QLS 7.4656 ILO r22'0986 DT 8.5410 RHO8 2'4612 NPHI 1619.6875 QLS 11.3066 ILO 18.0830 DT 8.6582 RHOB 2.510.0 NPHI 1514.6875 QLS 3.2991 ILD 184.8125 DT 9.2598 RHOB 2.1506 NPHI 2487.5000 QLS 9.0488 ILO 47..8242 DT 9.0332 RHOB 2.3284 NPHI 1520.6875 QLS 1.6397 iLO 121.7148 DT 8.7207 RHOB 4.6570 NPHI 301.3906 QLS 2.1370 ILO 129.4375 DT -999.2500 RHOB -999.2500 NPHI -999.2500 QLS 2.3420 ILD -999,2500' ILM -99:9.2500 GR 2.1917 DRHO 23.5840 PE~ -0.0405 QSS 2.2073 I-LM 89.2148 GR 2.51.00 DRHO 19.5801 PEF 0.0112 QSS 2.9.573 ILM 79.5273 GR 2.3987 DRHO 23.14.45 PEF -0.0024 QSS 7.2781 ILM 90.7773 GR 2.3108 DRHO 23..4863 PEF -0.003'9 QSS 4.2156 ILM 66.2148 GR 2.7659 DRHO 17.9687 PEF 0.0298 QSS 7.2546 ILM 86.6523 GR 2'3303 DRHO 21.53,32 PEF -0.0127 QSS 1.3077 ILM 56.6992 GR 2.3635 DRHO 52.5879 PEF -0.0273. QSS 1.9161 ILM 66.9648 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 1.5362 ILM -999.2500 -999.2500 0.0464 5.04'76 0.1318 2.5764 50.1680 0.0024 3.2932 0.0166 3.1584 22.0986 0.013'/ 2.7405 0.0430 6.2781 18.0830 -0.0044 2.3420 0.0181 3.3088 184.8125 0.0176 6.2351 0.0361 7.2039 47.8.242 0.0083 2.2502 0.0352 1.3692 53.3242 -0.4741 68.9648 -0.1855 1.9503 60.9492 -999.2500 -999.2500 -999.2500 1.6260 LVP 010.H02 VERIFICATION LISTIN~ P4GE 6 S P GR NC N'L DEPT SP NRAT NCNL DEPT Sp,, NRAT NCNL DEPT SP NRAT NCNL DEPT SP GR NRAT NCNL OEPT SP GR NRAT NCNL DEPT SP GR NR A'T NCNL OEPT SP NRAT NCNL DEPT SP GR NRAT NCNL DEPT '36r'7383 -999'2500 -999'2500 -999.2500 11300.0000 -40.7383 -999,Z500 -999.2500, -999,2500 11,200.0000 -45?9883 -999'2500 -999.2500 -999.2500 11100,0000 -46,7383 -999,2500 -999,2500 -999,2500 11000.'0000 -47.7383 -999,2500 -999,2500 -999,2500 10900.'0000 -49'2383 -999,2500 -999,2500 -999,2500 10800,0000 -50,9883 -999,2500 '999,2500 -999,2500 10700.0000 -31.2451 -999,2500 -999.2500 -999.2500 10600,0000 -33,9258 -999,2500 -999,2500 -999,2500 10500,0000 GR CALI RN RA FCNL SF:LU GR CA,LI RNRA FCNL SFLU GR CALI RNR~ FCNL SFLU CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU 12t.9648 DT -999.2500 RHDB -999.2500 NPHI -999.250.0 QLS 2.1331 ILD 132.4375 DT -999.2500 RHOB -999.2500 NPHI -999.2500 QLS 2.7502 ILD 98.4023 DT -999,2500 RH05 -999.2500 NPHI -999,2500 QLS 3.5959 I'LO 74.0273 DT -999.2500 RHOB -999.2500 NPHI -999,2500 QLS 3.3518 ILD 79.0273 DT -9'99.2500 RHOB -999.2500 NPHI -999.2500 QLS Z.9319 ILD 98.0:273 DT -999.2500 RHOB '-999.2500 NPHI · -999.2500 QLS 1.7452 ILO 114.9023 DT -999.2500 RHO~ -999.2500 NPHI -999.2500 QLS 1.4854 ILO 115.5898 DT -999.2500 RHOB -999.2500 NPHI -999.2500 QLS 2.2581 ILO 101.9023 DT -999.2500 RHOB -999.2500 NPHI -999,2500 QLS 2.5194 ILO 56'3242 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 1.8262 ILM -999.2500 GR -999.2500 ORHO -999.2500 PEF -999,2500 QSS 2.5491 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999,2500 QSS 3.2522 ILM -999.250'0 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 2.9924 ILM -9'99.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 2.2561 I'LM -999.2500 GR -999.2500 ORHO -999.2500 PEP -999,250.0 QSS 1,4844 ILM -999,2500 GR -999,2500 DRHO -999,2500 PEF -999.2500. QSS 1.3116 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 2.1663 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 qSS 2.6565 ILM 55.1367 -999.2500 -99'9.2500 -999.2500 1.8858 -999.2500 -999.25'00 -999,2500 -999,2500 2.6838 -999,.2500 -999,2500 -999.2500 -999.2500 3.3987 -999.2500 -999.2500 -999.2500 -999.2500 3,0881 -'999,2500 -999.2500 -999,2500 -999,2500 2,3596 -999,2500 -999,2500 -999.2500 -999,2500 1,5411 -999,2500 -999,2500 -999,2500 -999,2500 1,3809 -999,2500 -999,2500 -999,2500 -999.2500 2.2209 -999.2500 -999,2500 -999,2500 -999.2500 2.6897 LVP 010.HOZ, VERIFICATION LISTING PAGE ? SP GR NRAT N.CNL DEPT SP GR N:R A T NCNL DE PT SP GR NR AT NC NL DEPT SP GR NRA T; NCNL DEPT NRAT~ NC NL DEPT SP NRAT NCNL DEPT SP GR NRAT, NCNL DEPT SP GR NRAT NC NL DEPT SP GR NRAT NCNL DEPT -38,9258 GR -999.2500 CALI -999,2500 RNRA -999.2500 FCNL 10400.0000 -39,4570 -999.2500 -999.2500 -999.2500 10300.0000 -37.7383 -999.2500 -999.2500 -999.2500 10200,0000 -38.9583 '999. 250'0 -999,2500 -999.2500 10100,000'0 -44-2383 -999.2500 -999.25.00 -999.2500 10000.0000 -14.5293 -999.2500 -999.2:500 -999.2500 9900'0000 -20,0264 -999,2500 -999,2500 -999,2500 9800.0000 -21,0264 -999.2500 -999.2500 -999.2500 9700.0000 -22,510'7 -999.2500 -999.2500 -999.2500 9500.0000 SFLU GR CALI FCNL S F L U GE C A L I 'RNRA FC NL SFLU GR CALI R'NRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU 97,0273 D'T -999,2500 RHOB -999,2500 NPHI -999,2500 QLS 2-9534 ILD 75,1523 DT -999,2500 RHOB -999,250'0 NPHI -999.2500 QLS t.3565 ILD 11t.8398 DT -999.2500 RHO~ -999.2500 NPHI -999,2500 QLS 1.2022 ILO 101,0273 DT -999.2500 RHOB -999.2500 NPHI -999.2500 QLS 1,2159 ILO 106,9023 DT -999.2500 RHOB -999,2500 NPHI -999.2500 QLS 1.6856 ILD 105,4023 DT -999.2500 RHOB -999,2500 NPHI -999,2500 QLS 1.7325 ILO 114.. 0273 DT -999.2.5'00 RHOB -999.2500 NPHI -999.2500 OLS 1.9317 ILD' 119,7148 DT -999.2500 RHDB -999.2500 NPHI -999.2500 QLS 2.8127 ILD 97.8398 DT -999.2500 RHOB -999.2500 NPHI -999.2500 2. 0413 ILD -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 2.8499 ILM -999.2500 GR -999,2500 DRHO -999,2500 PEF -999,2500 QSS 1.3223 ILM -999.2500 G,R -999.2500 DRHD -999,,2500 PEF -999.2500 QSS 1.1221 ILM -999,2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 1.2413 ILM -999,2500 GR -999,2500 DRHO -9'99,2500 PEF -999.2500 QSS 1.6006 ILM -999.2500 GR -999.2500 DRMD -999.2500 PEF -999.2500 QSS 1.8155 ILM -999.2500 GR -999,2500 DRHO -999,2500 PEF -999.2500 QSS 1.9141 ILM -999,2500 GR -999,2500 DRHD -999.2500 PEF -999.2500 QSS 2.8499 ILM -999.2500 GR -999,2500 ORHO -999.2500 PEF -999.2500 QSS 2.0374 ILM -999.2500 -999,2500 -999,2500 -9'99.2500 2.9397 -999.2500 -999.2500 -999.2500 -999.2500 1.3633 -999.2500 -999.2500 -999.2500 -999.2500 1.1592 -999.2500 -999.2500 -999.2500 -999.2500 1.2999 -999.250'0 -999.2500 -999.2500 -999.2500 1.6465 -999.2500 -999.2500 ,-999.150'0 -999.2500 1.8487 -999.2500 -999.2500 -999.2500 -999.2500 1.9190 -999.2500 -999.2500 -999.2500 -999.2500 2.8557 -999.2500 -999.2500 -999.2500 '999.2500 2.0217 LVP 010.H02 VERIFICATION LISTING PAGE 8 SP GR NR AT NC NL DEPT SP' GR NRAT NCNL DEP'T 5P GR NRAT NCNL DEPT SP GR NRAT NC NL DEPT SP GR NRA T N C N'L DEPT SP GR NRAT NCNL DEPT sP GR NRAT NCNL DEPT SP GR NR~T NCNL DEPT SP GR NRAT NCNL DEPT -23.'2764 GR -999.2500 CALI -999-2500 RNRA -999.2500 FCNL 9500.0000 SFLU -206.6875 GR -999.2500 CALI -999.2500 RNR~; -'999.2500 FCNL~ 9400'0000 SFLU' '-27~4795 GR -999.2500 CALI -999'2500 RNRA -999.2500 FCNL:i 9300.00'00 -31.1201 -999.2500 -999.2500 -999.2500 9200.0000 -34.4570 -999.2'500 -999.. 2.500 -999.2500 9100.0000 -40'7070 -999.2500 '999.2500 -999.2500 9000.0000 -4~.0820 -999.2500 -999.2500 -999.2500 8900.0000 -42.0820 -999.2500 -999.2500 -999.2500 8800.0000 -43.4570 -999.2500 -999.2500 -999.2500 8700.0000 SFLU GR CALI RNRAL FCNL~ SFLU GR CALI RNRA F.CNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FC N L SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU 101.9648 OT -999.2500 RHOB -99'9.2500 NPHI -999.2500 QLS 2.4,709 ILO 101. 277:3 DT -999.2500 RHOB -999.2500 NPHI -999.2500 QLS 2.2737 ILO 106.3398 DT -999.2500 RHOB -999.2500 NPHI '999.2500 QLS 1.7940 ILO 103.8398 DT -99'9.2500 RHO8 -999.2500 NPHI -999.2500 QLS 2.2991 ILO 111.9023 DT -999.2500 RHOB -999.2500' NPHI -999.2500 QLS 2.5667 ILO 102.3398 D'T -999.2500 RHOB -999.2500 NPHI -999.2500 QLS 2.9866 ILO 92.7148 DT -999-2500 RHOB -999.250~0 NPHI. -999.2500 QLS 5.0867 ILO 215.0625 DT -999.2500 RHOB -999.2500 NPHI. -999.2500 QLS 4.1375 ILD 242.3125 OT -999.2500 RHOB '-999.2500 NPHI -999.2500 QLS 3. 5920 ILO -999.2500 GR -999.Z500 ORHO -999.2500 PEF -999.2500 QSS 2.4846 ILM -999.25.00 GR -999.2500 DRHD -9'99.2500 PEF -999.2500 QSS 2.1135 ILM -999.2500 GR -999.2500 ORHO -999.2500 PEF -999.2500 QSS 2.0413 ILM -999.2500 GR -999.2500 DRHD -99'9.2500 PEF -999.2500 QSS Z..3010 ILM -999'2500 G,R -999.2500 ORHO -999.2500 PEF -9:99.2500 QSS 2.6702 ILM ,-999.2500 GR -999.2500 DRHD -999.2500 PEF -'999.2500 QSS 2.8459 ILM -999.2500 G'R -999.2500 ORHg -999.2500 PEF -999.2500 QSS 4.4812 ILM -999,2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 3.1194 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 3.1760 ILM -999.2500 -999.2500 -999.2500 -999.2500 2.3352 -999.2500 -999.250'0 -999.2500 -999.2500 2.1174 -999.2500 -999.2500 -999.,2500 -999.2500 1.9493 -999.2500 -999.2500 -999.2500 -999.2500 2.2991 -999.2500 -999.2500 -999.2500 -999.2500 2.6741 -999.2500 ,-999.2500 -999.2500 -999.2500 2.8381 -999.250'0 -999.2500 -9'99.2500 -999.2500 4.5242 -999.2500 -999.2500 -999.2500 -999.2500 3.1838 -999.2500 -999.2500 -999.2500 -999.2500 3.1506 L'VP OlO.H02 VERIFICATION LISTING PAGE 9 NR AT NCNL DEPT SP NRAT' NCNL DEPT SP GR NRAT. NCNL DEPT SP GR NRAT NC NL DEPT SP GR NRAT NCNL OEPT SP NRAT NCNL DEPT SP GR NRAT NCNL OEPT SP GR NRAT NCNL DEPT SP GR NRAT NC N:L DEPT -51.8320 GR -999.2500 C~Li -999.2500 RNR& -999'2500 FCNL 222.1875 DT -99'9.2500 RHOB -g99.2500 NPHI -999.2500 QLS 8600.0000 SFLU -45.7383 GR -999-2500 CALI -999,2500 RNRA -999.2500 FCNL 4.1531 ILO 146'5625 DT -999.2'500 RHOB -999.2500 NPHI -999.2500 QLS 85:00'0000 '42.9883 -999.2500 -999.2500 -999.2500 SFLU GR CALI RNRA FCNL 2.0452 ILD 119.7148 DT -999.2500 RHOB -999.250'0 NPHI -999.2500 QL;S~ 8400.0000 -59.0508 -999,2500 -999.2500 -999..2500 SF'LU GR C~LI RNRA FCNL 4,2820 184,1875 -999.2500 -999,2500 -999,2500 8300,0000 -45-7070 -999,2500 -999.2500 -99'9,2500 SFLU GR C A L I RNR4 FCNL 2..1018 166.187,5 -999.2500 -999.250:0 -999,2500 8200,0000 -49.5820 -999,2500 -999,25.00 -999.2500 SFLU GR CAL .I RNRA FCNL 2.7542 184,9375 -999,2500 -999,2500 -999,2500 8100.0000 -21.8701 -999.2500 -999.2500 -999.2500 SFLU GR CALI RNRA FCNL ILD DT RH08 NPHI QLS 8000.0000 SFLU -25.8232 GR -999.2500 CALI -999.2500 RNRA -999.2500 FCNL ILD DT, RHDB N PHI QLS 7900.0000 SFLU -25.7295 GR -999.2500 CALI -999.2500 RNRA -999.2500 FCNL ILO DT RHO6 NPHI 'QLS 7800.0000 SFLU 4.0007 ILD 114.9023 DT -999. 2500 RHOB -999.2500 NPHI -999,2500 QLS 2.2913 ILO '169.$625 DT -999.2500 -999.2500 NPHI -999.2500 QLS 2.5745 ILD 107.589.8 DT -999.2500 RHO5 -999.2500 NPHI -999.2500 QLS 2.1233 iLO -999,2500 -999.2500 -999.2500 -999.2500 GR~ DRHO PEF Q S'S 3.1:116 ILM -999.2500 -999.2500 ORHO -999'2500 PEF: -999.25,00 'QSS 1.7549 '-999. 2500 -999.2500 - 99' 9 . 2500 -999. 2500 ILM GR DRHO 'PEF QSS 3.5627 !LM -99:9.2500 GR: -999.2500 ORHO -999.250;0 PEF -999.2500 QSS 1,6505 -999,2500 -999,2500 -999,2500 -999,2500 GR D RHO PEF.: qSS 2.0139 -999.2500 GR -999.2500 DRHO -999.2500 P'EF -999.2500 QSS 2.5959 ILM -999,2500 G;R -999.2500 DRHO -999.2500 PEF, -999..2~00 OSS 1.9092 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 1.8321 ILM -999.250.0 GR -999.2500 DRHO -999.2500 PEF -999,2500 QSS 2.3049 ILM -999 -2 500 -999,2500 -999,2500 -999°2500 2.9924 -999.2500' -999.2500 -999:.2500 -999.2500 1,8214 -999,2500 -999,2500 -999.2500 -999,2500 3.4358 -999,2500 -999,2500 -999,2;50:0 -999.2500 1.7022 -999.250'0 -999.2500 -999.2500 -999.2500 2.0510 -999.250'0 -999,2500 -999,2500 -999.2500 2.6'760 -999,2500 -999.2500 -999,2500 -999.250'0 1.9180 -999.2500 -999.2500 -999.2500 -999.2500 1,8848 -999,2500 -999.2500 -999,2500 -999.2500 2.2092 LVP 010,H02 VERIFICATION LISTING PAGE 10 GR NR ~T NCNL DEPT SP GR NRAT. NC NL DEPT' SP GR NRA'T NCNL DEPT SP GR NR AT NCNiL DEPT GR NRAT NCNL DEPT SP NR~T NCNL DEPT SP GR NR~T NCNL DEPT SP GR NR~T NCNL DEPT SP GR NR.~T NCNL OEPT -26,7295 GR 94° .-999,2500 C~LI -999. -999,2500 RNRA 999, -999.2500 FCNL' -9'99. 7700,0000. SFLU -34.3945 GR 114. -999.2500 CALl -999. -999..2500 RNRA -999- -999,2500 FCNLi -999. 7600.0000 SFLU 3. -36.1758 GR 101. -999.2500 'CALl. -999. -999,2500 RNRA -999. -999.2500 FCNL -999, 7500.0000 SFLU 2, -36.8008 GR :105. -999.2500 CALI '999. -999,2500: RNRA -999. -999.2500 FCNL -999. 7400.0000 SFLU 2. -35'3633 GR 93. -999-2500 CALI -999. -999.2500 RNRR -999, -999.2500~ FCNL -99'9..' 7300.0000 SFLU 2. -37'5820 GR 93. -999.2500 CALI -999. -999'2500 RNRA -999, -999,2500 FCNL -999, 7200,0000 SFLU -41.3945 GR -999,2500 CALi -999.2500 RNRA -999.2500 FCN.L 7100.0000 SFLU -43.5508 GR -999.2500 CALI -999.2500 RNRA -999,2500 FCNL 7000.0000 SFLU -39.3633 GR -999.2500 CAL'I -999.2500 RNRA -999.2500 FCNL 6900.0000 SFLU 98. -999. -999. -999. . 102. -999. -999. -999. . 89. -999. -999. -999. 3398 2500 2500 2500 9788 5898 2500 2500 2500 0842 7773 25 O0 2500 2500 7874 ,3398 2500 2500 2500 6506 2148 2500 2500 2500 9299 0898 2500 2500 2500 0867 2773 2500 2500 2500 1389 7148 2500 2500 2500 1799 2773 2500 2500 250O 3796 DT RHOB NPHI QLS ILO DT RHOB NPHI QLS ILD D.T RHO'B NPHI QLS ILD DT RHOB NP'HI Q.L S ILO DT RHOB NPHI QLS ILO NPHI QLS ILD DT RHOB NPHI QLS ILO DT RHDB NPHI QLS ILD DT RHD5 NPHI C)LS ILD '999.25O0 GR -999.2500 DRHO -'999.2500 PEF -999.2,500 QSS 3.3069 ILM -999.2500 GR -999.2500 DRHO -999,2500 PEF -999.2500 QSS 3.4963 ILM -999.2500 GR -999.2500 DRHO -9'99.2500 PEF -999,2500 QSS 3.2620 I,LM -999.2500 GR -999.2500 DRHO -999°2500 PEF -999.2500 Q,SS 3.1838 ILM -999.25'00 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 3.4573 ILM -999.2500 GR -999.250.0 DRHO -999.2500 PEF -999.2500 QSS 4.7820 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 3.8323 ILM -999.2500 GR -999.2500 DRHD -999.2500 PEP -999.2500 QSS 2.59.01 ILM -999.2500 GR -999.2500 DRHD -999.2500 PEF. -999,2500 QSS 4.4578 ILM -999.2500 -999.2500 -999.2500 -999.2500 3.1038 -999.2500 -999.2500 -999.2500 -999.2500 3.3245 -999.2500 -999.2500 -999.2500 -999.2500 3.0510 -999..2500 -999.2500 -99'9.2500 -999.2500 3.. 0959 -'999 500 -999.2500 -999.2500 3.2502 -999.2500 -999,2500 -999,2500 -999.2500 4.5046 -999,2500 -999.2500 -999.2500 -999.2500 3.5334 -999.2500 -999.2500 -999.2500 -999.2500 2.4065 -999.2500 -999.2500 -999.2500 -999,2500 4.6726 --1 LVP OlO.H02 VERIFICATION LISTING PAGE ¸SP NRAT N C N L O E PT SP GR NRAT NC NL DEPT SP 'GR' NR A'T NC NL DEPT GR NR AT NCNL DE PT SP, GR N,R A T NC NL -47.8945 GR -999.2500 CALI -999'2500 RNRA -999.2500 FCNL 6800.0000 SFLU -52'3945 GR -999,2500 C.ALI -999.2500 RNRA -999.2500 FCNL 5700.0000 SFLU -49'0195 GR -999.2500 CALZ -999-2500 RNRA -999.2500 FCNL 6600.0000 SFLU -43'26!95 GR -999.2500 CALI -999.2500, RNRA -999.2500 F~CNL 6500.0000 SFLU -57.1445 GR -999.2500 CALI -999.2500 RNRA -999.2500 FCNL OEPT 6400.0000 SFLU SP -78.0352 GR GR -999.2500 CALI NRAT -999.25,00 RNRA NCNL -999.2500 FCNL DEPT 6300.0000 SFLU SP -76.6602 GR GR -999.2500 CALI NRAT -999.2500 RNRA NCNL -999.2500 FCNL DEPT 6200.0000 SFLU SP -70.9102 GR GR -999.2500 CALI NRAT -999.2500 RNRA NCNL -999.2500 FCNL OEPT 6100.0000 SFLU SP -54.1445 GR GR -999.2500 CALI NRAT -9'99.2500 RNRA NCNL -999.2500 FCN'L DEPT 6000.0000 SFLU '104.7773 DT -999.2500 RHOB -9'99.2500 NPHI -999°2500 QLS 3,4592 ILD 93,9023 DT -999.2500 RHOB -999,2500 NPHI -999.2500 QLS 2.6799 76.0273 DT -999.2500 RHOB -999.2500 -999.25'00 QLS 2.6799 ILD 70.7773 DT -999.2500 RHOB -999.2500 NPHI -999.2500 QLS 3,0237 ILO 80'5898 DT -999,2500 RHOB -999,2500 NPHI -999,2500 QLS 5.5046 ILO 50.3867. DT -999.2500 RHOB -999.2500' NPHI -99'9,2500 QLS 3.7463 ILO 73.4023 DT -999.2500 RHO8 -999.2500 NPHI -999.2500 QLS 4.7234 ILO 50.2305 OT -999-2500 RHOB -999.2500 NPHI -999,2500 QLS 6.8875 ILD 56.4180 DT -999.2500 RH08 -999.2500 NPHI -999.2500 QLS 8.2910 ILO -999,2.50'0 GR -999.2500 DRHO -999,2500 PEF -999.2500 QSS 4.0789 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 3.5178 ILM -999'2500 GR -999.2500 DRHO -9'99.2500 PEF -999.2500 QSS 3.3616 ILM -999,2500 GR -999,2500 DRHD -999,2500 PEF -999.2500 QSS 3.8,577 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 3.6370 ILM -999,2500 GR '-999.2500 DRHO -99'9,2500 PEF -999.2500 QSS 4.1296 ILM -999.2500 GR -999.2500 DRHD -999.2500 PEF -9'99.2500 QSS 1.9063. ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999,2500 QSS 5.3210 ILM -999,2500 GR -999,2500 DRHD -999,2500 PEF -999.2500 ~SS 5.4070 ILM -999.2500 -999.2500 -999.2500 -999.2500 3.7834 -999.2500 -999.2500 -999,2500 -999.2500 3.1624 -999.2500 -999.2500 -999.2500 -999.2500 3.064'7 -999.2500 -99'9.2500 -999.2500 -999.2500 3.5940 -999,2500 -999.2500 -999.2500 -999.2500 3.8635 -999.2500 -999,2500 -999.2500 -999.2500 3.9846 -999.2500 -999.2500 -999.2500 -999.2500 2.1799 -999.2500 -999.2500 -999.2500 -999.2500 5.5437 -999,2500 -999,2500 -999.2500 -999.2500 5.8171 LVP 010.H02 VERIFICATION LISTING PAGE 12 SP GR NRAT NCNL DEPT SP GR NRAT NCNL OEPT SP GR NCNL gEPT SP GR NRAT NCNL OEPT SP GR NRA'T NCNL OEPT SP GR NRAT NCNL 'DEPT SP GR NEAT NCNL gEPT SP GR NRAT NCNL DEPT SP GR NR~T NCNL DEbT -38.6758 -999'2.500 -999..2500 -999.2500 590O.0O00 "-50,7695 -999.2500 -999-2500 -999,2500 5800,0000 -23,4014 -999,2500 -999,2500 -999,2500 570'0.0000 -15.9512 -999,2500 -999°2500 -999,2500 5600,0000 -18,12101 -999,2500 -999,2500 -999,2500 5500,0000 -52,1133 -999,2500 -999,2500 -999,2500 5400.0000 -49,9883 -999,2500 -999,2500 -999,2500 5300,0000 -25,7451 -999,2500 -999,2500 -999,2500 5200.0000 -23.4951 -999.2500 -999.2500 -999.2500 5100.0000 GR CALI RNRA' F:CNL SFLU' GR CALI RNRA: FCNL. SFLU GR RNRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALl RNRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA F~CNL SFLU GR C~LI RNRA FCNL SFLU GR CALI RNR4 FCNL SFLU 49.949.2 OT -999.2500 RHOB -999.2500 NPHI -99'9.2500 QLS 8.306,6 ILD 56,1992 DT -999.2500 RHOB -999.2500 NPHI -999.2500 QLS 4.0242 ILO 59,2930 DT -999.2500 RHOB -999.2500 NPMI -999.2500 QLS 5.2664 ILD 75,2148 DT -999,2500 RHOB -999,2500 NPHI -999.2500 QLS 4,32.i0 ILD 77.1523 DT '-9'99.2500 RHDB -999.2500 NPHi -999.2500 QLS 4.1414 ILO 57.9492 DT -999.2500 RHOa -999.2500 NPHI -999,2500 QLS 5,8367 ILO 58.3867 DT -999-2500 RHOB -999,2500 NPHI -999.2500 QLS 2.9924 ILO 95,7773 DT -999.2500 RMOB -999,2500 NPHI -999,2500 QLS 3.4241 ILD 85.2148 DT -999.2500 RHOB -999.2500 NPHI -999.2500 QLS 3.8323 ILO -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 8.0879 ILM -9.99.2500 GR -999.2500 DRMO -999.2500 PEF -999.2500 QS'S 3.43'77 ILM -999,2500 GR -999,2500 DRMO -'999,2500 PEF -999.2500 QSS 4,4890 ILM -999,2500 GR -999,2'500 DR'HO -9'99,25'00 PEF -999.2500 QSS 4.'7937 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEP -999.2500 ~SS 3.5608 ILM -999,2500 GR -999.2500 DRHO -999,2500 PEF -999.2500 QSS 7.6375 ILM -999,2500 GR -999.2500 DRHO -9'99,2500 PEF -999.2500 QSS 3,8459 ILM. -999.2500 GR -999.2500 ORHO -999.2500 PEF -999,2500 QSS 4.3679 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 4,3250 ILM -999,2500 -999,2500 -999.2500 -999.2500 8. 5488 -999,2500 -999.2500 -999,2500 -999.2500 3.6663 -999.2500 -999.2500 -999.2500 -999.2500 4.5984 -999,2500 -999.2500' -999,250.0 -999,2500 4.~968 -999,2500 -999.2.500 -999,2500 -999.2500 3.6565 -999,2500 -999,2500 -999,2500 -999,2500 7,3367 -999,2500 -999.2500 -999,2500 -999,2500 3,3694 -999,2500 -999,2500 -999,2500 -999.2500 3,7053 -999,2500 -999,2500 -999,2500 '999,2500 4.22.34 LVP OlO.H02 VERIFICATION LISTING PAGE 13 SP -33.2383 GR GR -9'99,2500 C~LI NR~T -999.2500. RNR~' NCNL -999,,2500 FCNL 70.4648 DT -999,2500 RHOB -999,2500 NPHI -999.2500 QLS DEPT 5000,0000 SFLU' SP -35'6133 GR GR -999.2500 CALl NRAT '-999,2500 RNRA NCNL -999,2500 FCNL 4,9070 91,9648 -999.2500 -999,2500 -999.2500 DEPT 4900.0000 SF:LU SP -83,3~77', GR GR ,-999,2500 CALl NRAT -999.2500 RNRA NCNL -999,,2500 FCNL ILD DT RH06 NPHI QLS DEPT 4800,0000 SP ,-69,7227 GR -999-2500 NRAT '-999,2500 NCNL -999.2500 SFLU .GR CALI RNR& FCNL. 4.9656 tLD 51,9492 DT .-999-2500 RHO8 -999,2500 NPHI -999.2500 QLS DEPT 47'00.0000 SP -81,3477 GR -999.2500 NR~T -999°2500 NCNL -999.2500 SFLU GR CALI RNR4 FCNL 5,0203 ILO 48.2617 OT -999.2500 RHO6 -99'9.2500 NP'HI ,-999.2500 QLS OEPT 4600.0000 SP -67,5977 GR -999.2500 NRAT -999.2500 NCNL -999,2500 SFLU GR CALI RNR4 FCNL 79,9023 3~.,1367 -999,25t00 -999,2500 -999.2500 DEPT 4500,0000 SP -71-4727 GR -999,2500 NR4T -999,2500 NCNL -999,2500 SFLU~ GR CALI RNRA FCNL ILD OT RHOB NPHI QLS OEPT 4400.0000 SP -53,7383 GR -999,2500 NRAT -999,2500 NCNL -999.2500 SFLU' GR C~LI RNRA FCNL 58.7617 ILO 36,3867 DT -999.2500 RHOB -999.2500 NPHI -999,2500 QLS DEPT 4300.0000 SFLU SP -45.8633 GR GR -999.2500 CALI NR~T -999.2500 RNR~ NCNL -999.2500 FCNL 29,1455 40,6992 -9'99,2500 .-999,2500 -999,25'00 DEPT 4200,0000 SFLU ILO DT RHOB NPHI QLS 8,3770 ILO 66,7773 DT. '999,2500 RHOB -999,2500 NPHI -999,2500 QLS 7.7468 ILD 78.5273 DT -999.2500 RHO~ -999.2500 NPHi -999.2500 QLS 6.1335 ILO -999.2500 GR -999.2500 DRHO -999.250'0 PEF -999.2500 QSS 5.6179 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 4.1609 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 4.1609 ILM -999,2500 GR -999.2500 DRHO -999.2500 PEF -999,2500 QSS 50.4180 ILM -999.2500 GR -999.2500 DRHO -999.2500 PE~ -999,2500 QSS 5B.1992 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEP .-999.2500 QSS 23.5361 ILM -999'2500 GR -999.2500 DRHO -999.2500 PEF -999,2500 QSS 8.3379 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 9.1895 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEP -999.2500 QSS 7,2625 ILM -999.2500 -999.2500 -999.2500 -999.2500 5.2039 -999.2500 -999.2500 -999.2500 -999.2500 4.2937 -999.2500 -999.2500 -999.2500 -999.2500 4.3523 -999.2500 -999.2500 -999-2500 -999.2500 63.4180 -999.2500 -999.2500 -999.2500 -999.2500 48.5117 -999.2500 -999.2500 -999.250'0 -999.2500 23.8018 -9'99.2500 -999.2500 -999.2500 -999.2500 7.3523 -999.2500 -999.2500 '999.2500 -999.2500 8.4707 -999,2500 -999.2500 -999.2500 -999.2500 6.6414 LVP OlO.HO2 VERIFICATION LISTING PAGE 14 SP GR NR~T NCNL DEPT SP GR NRAT NC NL DEPT SP GR NRAT NCNL 9EPT SP NR AT NCNL DEPT S,P GR, NRAT NCNL OEPT SP GR NRAT NCNL DEPT SP GR NRAT NCNL DEPT SP GR NRAT NCNL DEPT SP GR NR AT NCNL DEPT -48,4883 GR -999.2500 CALI '999,2500 RNRA -999.2500 FCNL 4100,0000 SFLU -41'7383 GR -999.2500 CALI -9'99,2.500 RNRA -999.2500 FCNL 4000.0000 SFLU -70.8477 GR -999.2500 CALI -999.2500 RNRA -999.2500 FCNL .3900,0000] SFLU -42-2383 GR -999.2500 CALI -999.2500' RNRA -999,2500 FCN:L 3800.0000 -46.$133 -999.2500 -999.2500 -999.2500 3700'0000 -74.2227 -999.2500 -999.2500 -999.2500 3600.0000 -63.4883 -999.2500 -999.2500 -999.2500 3500.0000 -77.0977 -999.2500 -999.2500 -999.2500 3400,0000 -57.2383 -999.2500 -999.2500 -999.2500 3300.0000 S~LU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU GR CALI RNRA FCNL SFLU ?9.7773 DT -999.2500 RHDB -999.2500 NPHI -999.2500 QLS 6- 4695 ILO 86,7148 OT -999. 2500 RHDB -999o 2500 NPHI -999.2'500 QLS 8,0,020 ILD 49.6992 DT -999.2500 RHD~ -999.2500 NPHI -999.2500 QLS 6.3'718 ILD 95.3398 DT -999.2500 RHOB -999.2500 NPHI -999.2500 QLS 7.3093 'ILD 84.714B DT, -999.2500 RHO6 '-999.2500 NPHI -999.2500 QLS 6,5046 ILD 50,0?42 DT -999.2500 RHOB -999.2500' NPHI -999.2500 QLS 5.6765 ILO 67.6523 DT -999.2500 RHD8 -999.2500 NPHI -999.2500 QLS 5,1062 ILO 44.1992 DT -999.2500 RHDB -999.2500, NPHI -999.2500 QLS 6.1765 iLD 57.7148 DT -999.2500 RHOB -999.2500 NPHI -999.2500 QLS 5.4.578 ILD -999-2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 7.8406 ILM -999-25~00 GR -999.2500 DRHO -999,'2500 PEF -999.2500 QSS 8.1191 ILM -999-2500 GR -999.2500 DRHO -999.2500 P'EF -999.2500 QSS 7.9~21 -99'9,.250~0 GR -999.2500 DRHO -999.2500 -999.2500 Q,SS 8.7598 ILM -999'2500 GR. -999,2500 DRHO -999.2500 PEF -999,2500 QSS 6.0164 ILM -999.2500 GR -999.2500 DRHD -999.2500 PEF -999.2500 6.0'906 ILM -999,2500 GR -999.2500 DRHO -999.,2500 PEF -999.2500 QSS 4.0789 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 6.7742 ILM -999.2500 GR -999.2.500 DRHO -999.2500 PEF -999.2500 QSS 6.9070 ILM -999.2500 -999.2500 -999.2500 -999.2500 6'6062 -999.2500 -999.2500 -999.2500 -999.2500 7,9070 -99:9.2500 -999.2500 -999.2500 -999.2500 6.8054 -999.250'0 -999.2500 -999.25~00 -999.2500 7.9890 -9'99.2500 -999.2500 -999.2500 -'999.2500 6.1,648 -999.2500 -999.2500 -999.2500 -999.2500 6.2078 -999.2500 -999.2500 -999.250'0 -999.2500 4.3523 -999.2500 -999.2500 -999.2500 -999.2500 6.6375 -999.2500 -999.2500 -999.2500 -999.2500 6.1414 LVP OlO.HOZ VERIFICATION LISTING PAGE 15 SP -39°363.3 GR GR -999,.2500 CALI NR~T, -999.2500. RNR4 NCNL -999.2500 FCNL DEPT 3200.00.00 SFLU SP -69.2227 GR GR -999.2500 CALI NR:AT,: -999:.2500 RNRA NCNL' -999.2500 FCNL OEPT 3100.0000 SFLU' SP -40.9883 GR GR -999.2500 CALI NRAT -999.25.00 RNRA NCNL -999.2500 FCNL DEPT SP GR NRAT NCNL 3000'000.0 SFLU 96o'7148 GR -999.2500 CALI -999.11500 RNRA -999.2500 FCNL DEPT 2996.0000 SFLU SP. 100,9648 'GR GR -999.2500 CALI NRAT -999.2500 RN'RA NCNL -999.2500 F'CNL 91.5898 -999.2500 -999.2500 -99'9.2500 5.8601 56,1367 -999.25'00 -999.2500. -999.2500 4.'0984 82-5273 -999.2500 -999.2500 -999.2500 1.7032 5'7.7305 -999.2500 -999.2500 -999.2500 1'6690 50.9180 -999.2500 .-999.2500 -999.2500 RHOB NPHI QLS ILO DT, RHOB NPHI. QLS ILD DT, RHOB NPHI QLS ILO O'T: RHOB NPHI. QLS ILO' DT,: 'RHOB NPH:I QLS -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 4.9539 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 5.0320 ILM -999..2500 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS 2000.6875 ILM -999.2500 GR -999.2500 DRHO -999.2500 PEF -gggo2500 QSS 2000.6875 ILM -999.250,0 GR -999.2500 DRHO -999.2500 PEF -999.2500 QSS -999.2500 -999.2500 -999.2500 -999.2500 5.1~14 -999.2500 -999.2500 -999.2500 -999.2500 4.5593 -999.2500 -999.2500 -999.2500 -999.2500 2000.6875 -999.2500 -999.2500 -999.2,500 -999.2500 2000.6875 -999.2500 -999.2500 -999.2500 -999.2500 ~ FILE TRAILER ~ FILE NAME :EDIT .00! SERVICE NAME : VERSION ~ : DATE : MAXIMUM LENGTH :,1024 FILETYPE : NEXT FILE NAME : -,.~'~ TAPE TRAILER ~'~.- SERVICE NAME :EDIT DATE :85/08/19 ORIGIN :0000 TAPE NAME :0740 CONTINUATION ~ :01 NEXT T~PE NAME : COMMENTS :SCHLUMBERGER WELL SERVICES CUSTOMER FIELD TAPE -'~ REEL TRAILER :,~ SERVICE NAME :EDIT LVP OIO.HOZ VERIFICATiON. LISTING PAGE 16 DATE :B5/08/19 ORIGIN : REEL NAME :142695 CONTINUATION ~ :01 NEXT REEL NAME : COMMENTS :SCHLUMBERGER WELL SERVICES CUSTOMER FIELO TAPE