Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout164-0061. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: CT Operations Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 9,215 feet 7539 & 8,437 feet true vertical 9,203 feet See schematic feet Effective Depth measured 7,539 feet 5,263 & 7,525 feet true vertical 7,534 feet 5,259 & 7,519 feet Perforation depth Measured depth See schematic feet True Vertical depth See schematic feet Tubing (size, grade, measured and true vertical depth) 3-1/2" N-80 7,560 (MD) 7,555 (TVD) Otis BWH Pkr 5,263 (MD) 5,259 (TVD) Packers and SSSV (type, measured and true vertical depth) Otis BWH Pkr 7,525 (MD) 7,519 (TVD) SSSV: N/A 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work:Middle Ground Shoal Oil 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title: Contact Phone: 2,020psi 3,830psi 1,530psi 2,730psi 3,520psi 6,340psi 1,987 1,986 Burst Collapse 520psi 1,130psi measured TVD Production Liner 7,151 9,066 Casing Structural 7,146 9,202 7,151 9,215 1,003 1,987 1,003Conductor Surface Intermediate 36" 20" 13-3/8" 9-5/8" 7" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 164-006 50-733-10070-00-00 3. Address: Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: ADL0017595 Middle Ground Shoal / Middle Ground Shoal Oil MGS ST 17595 04 Plugs Junk measured Length 400 measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 0 Gas-Mcf MD 400 N/A 0 Size 400 1,002 0 00 0 00 0 324-502 Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG 0 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Casey Morse Casey.Morse@hilcorp.com (907) 777-8322Operations Manager N/A Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Grace Christianson at 9:30 am, Nov 05, 2024 Digitally signed by Dan Marlowe (1267) DN: cn=Dan Marlowe (1267) Date: 2024.11.05 08:37:49 - 09'00' Dan Marlowe (1267) BJM 11/19/25 Updated by: CDM 10/09/24 WELLBORE SCHEMATIC Baker Ba-04 N Middle Ground Shoal Last Completed: 02-16-1993 (Injection Well since 1974) Size Type Wt/ Grade/ Conn ID Top Btm Cement Sacks CMT Top 36” Structural 34” 400’ 20” Conductor 94 / H-40 19.124 surf 1,003’ 1500 105 (Calc) 13-3/8” Surface 54.5 & 61 / J-55 12.515 surf 1,987 ‘2.5º2500 Surf 9-5/8” Intermediate 36, 40, 43.5 / J-55 & N-80 8.755 surf 7,151’ 765 4198 (Calc) 7” Prod Liner 23, 26 / N-80, S-95 6.366 6,935’ 9,215’ 1400 6935 7” Tie-back 23 / N-80 6.366 3,510’ 6,934’ 525 3790 (CBL)26 / N-80 6.276 1,322’ 3,510’ 29 / S-95 6.184 149’ 1,322’ Completion 3-1/2 Prod Tubing 9.2#, N80 BTC 32.0’ 7,560’ Completion Jewelry Detail # Depth Length ID OD Item 149’ 7” Tieback casing hung at 150’ in Underwater wellhead. 1 5,232’ 1.37 2.813 3.96 OTIS “X” Nipple 2 5,263’ 4.52 4.0 5.875 OTIS “BWH” Packer 3 7,482’ 4.10 2.813 4.450 OTIS “XA” Sleeve (opens up) 4 7,525’ 4.0 4.0 5.875 OTIS “BWH” Packer 5 7,547’ 1.37 2.813 3.96 OTIS “X” Landing Nipple 6 7,557’ 0.65 2.990 5.5 Re-Entry Guide 8,445’ Damaged Casing assumed to be collapse (2/93) * 10/2024 – Tag cement @ 7539’ SLM. CMIT to 2,300 psi successful. * 09/2024 – Fished tubing patch and tools @ 5215’, tag fill @ 7744’. Spot 8 bbl cement at 7742’ * 10/2010 – Circ 9.8 ppg brine in tubing and annulus. Pumped 36 bbl LCM pill. Has diesel cap. * 10/2010 – RIH w/2.73” GR to 7582’ RKB – no problems. Tubing punch from 5224’ – 5230’ RKB. * 09/2007 – Last Tag @ 7823’ w/SBHP Survey. 2.02” GR ran to 7855’ on 7/27/05. * 1984 – Pulled Tbg & found hole in collar which was causing communication to Tbg annulus. * 03/1993 – Passed MIT to 2000 psi on 3.5” X 7” for 30 min. * Could not pump into 9-5/8” to freeze protect on 9/9/05. FISH Below Retainer – Wireline Tools @ 8442’ Perforation Data Top Bottom Pool Info 5,310’ 7,275’ Tyonek A, B, C, E, F Pools Cement Squeezed 7,375’ 7,765’ Tyonek G-1, 2, 3 Cement Squeezed 7,785’ 8,405’ Tyonek G-4 OPEN 8,440’ 9,120’ Tyonek G-5 Below CMT Retainer PBTD =8437’ TD =9215’ MAX HOLE ANGLE = 6O @ 7918’MD/7910’TVD 6 36” 400’ 6935’ Liner Hanger RKB: MSL = 101’ Mudline= 203’ Water Depth= 102’ 7” 9168’ 7785’ – 8405’ Open perfs 1 5 3790’ TOC CBL 7525’ OTIS BWH Packer 8437 EST CMT Retainer 20” 1003’ 13-3/8” 1987’ 5419’ MGSOil Top BHT = 125 @ 7800’ TVD Pore Press = 3100 psi @ 7800 MD (7.6 ppg EMW) 8445’ CSG Collapse 5263’ OTIS BWH Packer 7744’ Tag Fill 9/2024 9-5/8” 7151’ Perfs Squz 5310’ - 6825’ Perfs Squz 7080’ – 7765’ Tbg Punch 5224’ – 5230’ 4198’ TOC Calc 4529’ MGS Gas Base 8 bbls cement Tag TOC 7539’ 1 3 4 X 2 XA 9.8 ppg brine X KB: MSL Mean Sea Level Mud Line ADL: 0017595 PTD: 164-006 Leg 5, Slot 1 API: 50-733-10070-00 Well Name:MGS ST 17595 04 API #:50733100700000 Field:Middle Ground Shoal Start Date:9/19/2024 Permit #:164006 Sundry #:324-502 End Date:10/8/2024 9/19/2024 9/20/2024 9/21/2024 9/22/2024 10/8/2024 Daily Operations: Well Operations Summary O oad black water iso and cement pod from boat. Fill cement pod and set pod and compressor by cement pump. - RIH with wash nozzle, BHA #3, tag 4k down at 5245' CTM. Establish circulation, circulate at 1.75 BPM, 3100 psi. work nozzle 4 times - RIH w/ Pump through GS tool, BHA #4, tag 5k down at 5251' CTM. P/u and see slight bobble. P/u to 5248' and back down to 5253' and tag (x-nipple), repeat 2 more times. P/u to 5200', pump down CT annulus, pump 5bbls FIW at 1bpm,300psi, (previous diagnostics, tubing - RIH w/ wash nozzle, BHA #5. Tag 3k down at 7730'. Circulate at 1.75 BPM, 2800psi, washing down to 7744', fill is hard packed, pump bottoms up, getting back fine scale and LCM. Start POOH while circulating at rate. Shut down pump at 5200', returns are clean, 138bbls circulated. Get to surface, shut in well, SDFN. Break down wash nozzle BHA. M/u cement nozzle BHA. RIH w/ cement nozzle, BHA #6, tag 3k down at 7744'. P/u to 7742' circulate bottoms up with FIW at 1.75 BPM, 2400psi. Batch up 8bbls, 14 PPG cement. Lead w/ 8bbls 9.8ppg brine. Pump 8bbls cement @ 1.3 bpm, 860psi, displace w/ brine at 1.3 bpm, 1100psi, laying cement from 7742', into tubing at 7557' up to 7500'. P/u to 7275', circulate real clean. Bump up, shut in well. Blow down reel. Wash up cement equipment. R/d coil tubing equipment. Secure loads, and move to west deck in preparation to load on boat. Prep equipment to backload boat. Pick and set cement pump from boat, backload w/ crane cable equipment. Fox, support crew, and cook arrive. Orientation, PTW, and PJSM with new arrivals. Set coil tubing equipment. R/u cement pump, r/u coil tubing on Ba-04. Test BOPE to 250/3500psi, all tests passed. Witness waived by AOGCC's Jim Regg. M/u wash nozzle BHA #1. RIH, tag at 5209' CTM, 2k down. Wash down at 1.75 BPM, 3100psi to 5221' CTM, sat down 4k, solid. Circulate 2 bottoms up, saw LCM at bottoms up. POOH. Change out nozzle w/ 1.75" hydraulic overshot. RIH with BHA #2, tag fish at 5215' CTM, put 5k down, P/u 18k over, fire jars and straight pull to 30k over, repeat. On 4th jar lick, let it soak at 30k over for 5 minutes, pull 3k more and weight broke over, saw initial drag when picking up. POOH. Retrieved whole slick line tool string, AD-2 stop still in hole. Rack lubricator and injector. secure well and SDFN. TOC tag -Ba-04 -RIH w/ 2.5"x6' DD bailer, tag cement at 7539' SLM. CMIT T/IA to 2300 psi - 15 min. 2404 psi down 5 psi - 30 min. 2404 psi down 0 psi (Good Test) 1.4 bbls in/ 1.4 bbls out. Page 1 of 1 Witnessed by AOGCC inspector Kam StJohn -bjm MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 31 Township: 9N Range: 12W Meridian: Seward Drilling Rig: n/a Rig Elevation: n/a Total Depth: 9203 ft MD Lease No.: ADL0017595 Operator Rep: Suspend: P&A: X Conductor: 20" O.D. Shoe@ 1003 Feet Csg Cut@ Feet Surface: 13-3/8" O.D. Shoe@ 1987 Feet Csg Cut@ Feet Intermediate: 9-5/8" O.D. Shoe@ 7151 Feet Csg Cut@ Feet Production: 7" O.D. Shoe@ 9215 Feet Csg Cut@ Feet Liner: O.D. Shoe@ Feet Csg Cut@ Feet Tubing: 3-1/2" O.D. Tail@ 7560 Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Fullbore Bottom 8000 ft 7539 ft 8.6 ppg Wireline tag Initial 15 min 30 min 45 min Result Tubing 2409 2404 2404 IA 2409 2404 2404 OA 5 5 5 initial 15 min 30 min 45 min Result Tubing IA OA Remarks: Attachments: Good tag, good test. MIT pumped 1.4 bbls and returned 1.4 bbls. October 8, 2024 Kam StJohn Well Bore Plug & Abandonment MGS ST 17595-04 Hilcorp Alaska LLC PTD 1640060; Sundry 324-502 none Test Data: P Casing Removal: Brad Whitten Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): rev. 3-24-2022 2024-1009_Plug_Verification_MGS_ST_17595_Ba-4_ksj 9 9 9 9 9 9 99 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 &0,77[,$ 9 James B. Regg Digitally signed by James B. Regg Date: 2024.11.19 11:16:45 -09'00' 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing 2.Operator Name: 4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool?N/A Yes No 9. Property Designation (Lease Number): 10. Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 9,215 7823 Casing Collapse Structural Conductor 520psi Surface 1,130psi Intermediate 2,020psi Production 3,830psi Liner Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Casey Morse Contact Email:Casey.Morse@hilcorp.com Contact Phone:(907) 777-8322 Authorized Title: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng Middle Ground Shoal Middle Ground Shoal Oil N/A 9,203 7,823 7,816 3,187 8,437 Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): Operations Manager STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0017595 164-006 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 50-733-10070-00-00 Hilcorp Alaska, LLC MGS St 17595-04 Length Size Proposed Pools: 400 400 9.2# / N-80 TVD Burst 7,560 6,340psi MD 3,520psi 1,530psi 2,730psi 1,002 1,986 7,146 1,003 1,987 400 36" 20" 13-3/8" 1,003 9-5/8"7,151 1,987 7,151 7,785 - 8,405 9,066 7,779 - 8,397 9,2027" Other: CT Operations 9/5/2024 3-1/2" Otis BWH Pkr / Otis BWH Pkr & N/A 5,263 (MD) 5,259 (TVD) / 7,526 (MD) 7,519 (TVD) & N/A 9,215 Perforation Depth MD (ft): No Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 9:16 am, Sep 05, 2024 Digitally signed by Dan Marlowe (1267) DN: cn=Dan Marlowe (1267) Date: 2024.09.05 08:16:15 - 08'00' Dan Marlowe (1267) 324-502 10-404 BJM 9/6/24 DSR-9/5/24 X CT BOP test to 3500 psi X Provide 48 hrs notice for AOGCC opportunity to witness CMIT TxIA to 2300 psi. Cement top target at 7500' MD. A.Dewhurst 09SEP24*&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2024.09.10 11:57:31 -05'00' 09/10/24 RBDMS JSB 091024 Oil Zone P&A Program Well: Ba-04 Well Name:MGS ST 17595 04 (Ba-04) API Number:50-733-10070-00-00 Current Status:Shut-In Injector Rig:CT, cement Estimated Start Date:September 2024 Estimated Duration:5 days Reg. Approval Req’d?Yes Regulatory Contact:Juanita Lovett First Call Engineer:Casey Morse 603-205-3780 (M) Second Call Engineer:Ryan Rupert 907-301-1736 (M) Current Bottom Hole Pressure (est):3075 psi @ ~7814’ TVD (PT survey 9/3/07, 7.6 ppg equivalent) Max. Potential Surface Pressure:2294 psi Gas Column Gradient (0.1 psi/ft) Current Pressures (T/IA/OA):vac/140/5 psi History Drilled and suspended in 1964 and completed as an oil producer in the Hemlock G zones and put on production in 1966. A workover was performed in 1974 to convert the well to a water injector. Subsequent workovers were performed in 1980 and 1993 to isolate selected Hemlock G zone intervals and perforate new intervals, respectively. Drilled 26” hole, ran 20” casing to 1,003’ MD. Cemented with 1000 sacks of Class A and 500 sacks of Class A w/ 2% CaCl2. Calculated top of cement assuming 10% washout is ~105’ MD. Top of 20” casing head landed 39’ above mud line. Distance KB to mudline is 188 feet and distance MLL water level to mud line is 102’. Drilled 17-1/2” hole to 2065’. Set 13-3/8” casing at 1987’. Cemented with 2500 sx Class A neat 15 ppg. Calculated top of cement with 10% washout is to surface. Drilled 12.25” hole to 7200’. Set 9-5/8” casing at 7153’. Cemented with 765 sx Class A, assumed 15 ppg. Calculated TOC on 9-5/8” casing with 10% washout is ~4198’. Drilled 8-5/8” hole to 7366’. Set 7” liner from 6935’ – 9215’ w/1400 sx Class A 15.5 ppg. Ran additional 7” casing from 6935’ – 149’ and cemented with 525 sx Class A 14 ppg. Ran CBL 9165’ – 2800’ showing top of cement on the 7” liner at 3790’. The well intermittently injected from 1993 up until the platform was SI in 2003. In October 2010 the tubing was punched from 5224’ – 5230’ MD. The well was then circulated with 9.8 ppg brine and a ~40bbl pill of CaCO3 was pumped to plug off the perforations. The full scope of the approved Sundry was to pump a cement plug to act as a reservoir abandonment plug but the cement work was never completed. In 2013 an attempt was made to patch the punched tubing and put the well back on injection. However, the patch was mis-set (top of patch packer set ~13’ below the tubing punch holes) and the tubing was not repaired. The top of the patch-packer and the two spacer pipes of the patch were successfully pulled. Several attempts to pull the bottom patch-packer (AD2 stop) were unsuccessful and resulted in a slickline toolstring (GS Spear, Spangs, Oil Jars) being LIH, latched into the bottom packer of the patch. LCM continued to fill back in on top of fish; numerous attempts to bail down to fish top were unsuccessful. Current Status Shut-in. Perforations are plugged with a Calcium Carbonate LCM pill and the tubing and IA are loaded with 9.8 ppg brine. Oil Zone P&A Program Well: Ba-04 Pre-P&A Diagnostics Performed 1. T: vac / IA: 5 psi / OA: 5 psi 2. Pump 9.8 ppg brine down tubing with returns up IA @ 900 psi, 2 bpm. 3. Attempt to inject down tubing, pressure up to 1500 psi after 0.85 bbls loaded into tubing. Hold for 5 minutes, no drop in pressure – no injectivity into perfs. 4. RU slickline, RIH w/ 2.75” GR to 5224’ SLM, tagged fish, POOH. RIH w/ 3.5” D&D Holefinder. Set @ 5,007’ SLM. Pressure test tubing to 500 psi for 5 minutes – good test. Objective Cleanout tubing to allow access to perfs with coil tubing. Lay in cement plug with coil tubing to plug and abandon the MGS Oil Pool. Completion of the wellbore abandonment will follow. Procedural steps Coil Tubing 1. MIRU Coiled Tubing and pressure control equipment 2. PT lubricator to 250psi low / 2500psi high 3. MU Fishing BHA a. Working fluid will be FIW (8.6ppg) b. Take returns to surface up the CT x tubing annulus c. Taking returns to formation is also permissible 4. RIH and cleanout fill on top of fish and dress fish top. Tagged fill inside tubing @ 5224’ SLM. Latch fish and POOH. 5. RIH w/ coil to tag inside the perfs ~8,000’ based on previous tag depth from 09/2007. 6. While on bottom, circulate wellbore to 9.8 ppg brine. 7. Pump reservoir abandonment plug as follows: a.26 bbl 14 ppg Class G cement i. Places top of cement inside the 3.5” tubing at ~7000’ b. Pull up into the tubing and circulate to clean out coil. 8. POH and RD coil Fullbore/Slickline 1. CMIT TxIA to 1500 psi (AOGCC Witnessed). 2. Tag TOC in Tbg (AOGCC Witnessed). Cement Tops x 20” Conductor o Cemented with 1000 sacks of Class A and 500 sacks of Class A w/ 2% CaCl2. o Cement report does not specify cement density. Assume 13 ppg ~2.0 cu-ft/sack o Cement volume: 534 bbl o Annulus volume: ƒ 1003’ to 400’: 603 ft * 0.2681 bpf = 269 bbl o 534 – (269 * 110%) = 238 bbl o Annular volume 400’ to surface: 0.7344 bpf o 238 / 0.7344 bpf / 110% = 295 ft o 400 ft – 295 ft = 105 ft x 13-3/8” Casing o Annulus volume: 304 bbl * 110% = 334 bbl CMIT to 2300 psi (.25psi/ft of liner depth per 20 AAC 25.112(g)) -bjm Perform CT BOP test to 3500 psi. -bjm Circulate out excess cement from 7500' MD. -bjm Oil Zone P&A Program Well: Ba-04 ƒ 1987’ to 1003’: 984’ * 0.1237 bpf = 122 bbl ƒ 1003’ to surf: 1003’ * 0.1815 bpf = 182 bbl o Cement volume 2500 sx 15 ppg, ~1.33 cu-ft/sack: 592 bbls o Cement to surface x 9-5/8” Casing o Annular volume: 0.0558 bpf o Cement volume 765 sx 15 ppg, ~1.33 cu-ft/sack: 181 bbl o 181 bbl / 0.0558 bpf = 3248 ft / 110% = 2953 ft o 7151 – 2953 = 4198 ft calculated TOC x 7” Liner o CBL on file with AOGCC T# 34802 Attachments: Current Schematic Proposed Schematic CT BOP Diagram Updated by: CDM 05/29/24 SCHEMATIC Baker Ba-04 N Middle Ground Shoal Last Completed: 02-16-1993 (Injection Well since 1974) Size Type Wt/ Grade/ Conn ID Top Btm Cement Sacks CMT Top 36”Structural 34”400’ 20” Conductor 94 / H-40 19.124 surf 1,003’ 1500 105 (Calc) 13-3/8”Surface 54.5 & 61 / J-55 12.515 surf 1,987 ‘2.5º2500 Surf 9-5/8” Intermediate 36, 40, 43.5 / J-55 & N-80 8.755 surf 7,151’ 765 4198 (Calc) 7”Prod Liner23, 26 / N-80, S-95 6.366 6,935’9,215’1400 6935 7” Tie-back 23 / N-80 6.366 3,510’6,934’ 525 3790 (CBL)26 / N-80 6.276 1,322’3,510’ 29 / S-95 6.184149’1,322’ Completion 3-1/2 Prod Tubing 9.2#, N80 BTC 32.0’ 7,560’ Completion Jewelry Detail # Depth Length ID OD Item 149’7” Tieback casing hung at 150’ in Underwater wellhead. 1 5,232’1.372.813 3.96 OTIS “X” Nipple 2 5,263’4.524.0 5.875 OTIS “BWH” Packer 3 7,482’4.10 2.813 4.450 OTIS “XA” Sleeve (opens up) 4 7,525’4.0 4.0 5.875 OTIS “BWH” Packer 5 7,547’1.372.813 3.96 OTIS “X” Landing Nipple 6 7,557’0.65 2.990 5.5 Re-Entry Guide 8,445’Damaged Casing assumed to be collapse (2/93) *10/2010 –Circ 9.8 ppg brine in tubing and annulus. Pumped 36 bbl LCM pill. Has diesel cap. *10/2010 –RIH w/2.73” GR to 7582’ RKB –no problems. Tubing punch from 5224’–5230’ RKB. * 09/2007 –Last Tag @ 7823’ w/SBHP Survey. 2.02” GR ran to 7855’ on 7/27/05. *1984 –Pulled Tbg & found hole in collar which was causing communication to Tbg annulus. * 03/1993 –Passed MIT to 2000 psi on 3.5” X 7” for 30 min. * Could not pump into 9-5/8” to freeze protect on 9/9/05. FISH Below Retainer –Wireline Tools @ 8442’ Perforation Data Top Bottom Pool Info 5,310’ 7,275’Tyonek A, B, C, E, F Pools Cement Squeezed 7,375’ 7,765’ Tyonek G-1, 2, 3 Cement Squeezed 7,785’ 8,405’ Tyonek G-4 OPEN 8,440’ 9,120’ Tyonek G-5 Below CMT Retainer PBTD =8437’ TD = 9215’ MAX HOLE ANGLE = 6O @ 7918’MD/7910’TVD 6 36” 400’ 6935’ Liner Hanger RKB: MSL = 101’ Mudline= 203’ Water Depth= 102’ 7” 9168’ 7785’ – 8405’ Open perfs 1 5 3790’ TOC CBL 7525’ OTIS BWH Packer 8437 EST CMT Retainer 20” 1003’ 13-3/8” 1987’ 5419’ MGS Oil Top BHT = 125 @ 7800’ TVD Pore Press = 3100 psi @ 7800 MD (7.6 ppg EMW) 8445’ CSG Collapse 5263’ OTIS BWH Packer 7823’ Tag Fill 9/2007 9-5/8” 7151’ Perfs Squz 5310’ - 6825’ Perfs Squz 7080’ – 7765’ Tbg Punch 5224’ – 5230’ 4198’ TOC Calc Installed Tbg Patch 5243’ – 5258’ 4529’ MGS Gas Base 3 4 X 2 XAXX 9.8 ppg brine KB: MSL Mean Sea Level Mud Line ADL: 0017595 PTD: 164-006 Leg 5, Slot 1 API: 50-733-10070-00 Updated by: CDM 05/29/24 PROPOSED Baker Ba-04 N Middle Ground Shoal Last Completed: 02-16-1993 (Injection Well since 1974) Size Type Wt/ Grade/ Conn ID Top Btm Cement Sacks CMT Top 36”Structural 34”400’ 20” Conductor 94 / H-40 19.124 surf 1,003’ 1500 105 (Calc) 13-3/8”Surface 54.5 & 61 / J-55 12.515 surf 1,987 ‘2.5º2500 Surf 9-5/8” Intermediate 36, 40, 43.5 / J-55 & N-80 8.755 surf 7,151’ 765 4198 (Calc) 7”Prod Liner23, 26 / N-80, S-95 6.366 6,935’9,215’1400 6935 7” Tie-back 23 / N-80 6.366 3,510’6,934’ 525 3790 (CBL)26 / N-80 6.276 1,322’3,510’ 29 / S-95 6.184149’1,322’ Completion 3-1/2 Prod Tubing 9.2#, N80 BTC 32.0’ 7,560’ Completion Jewelry Detail # Depth Length ID OD Item 149’7” Tieback casing hung at 150’ in Underwater wellhead. 1 5,232’1.372.813 3.96 OTIS “X” Nipple 2 5,263’4.524.0 5.875 OTIS “BWH” Packer 3 7,482’4.10 2.813 4.450 OTIS “XA” Sleeve (opens up) 4 7,525’4.0 4.0 5.875 OTIS “BWH” Packer 5 7,547’1.372.813 3.96 OTIS “X” Landing Nipple 6 7,557’0.65 2.990 5.5 Re-Entry Guide 8,445’Damaged Casing assumed to be collapse (2/93) *10/2010 –Circ 9.8 ppg brine in tubing and annulus. Pumped 36 bbl LCM pill. Has diesel cap. *10/2010 –RIH w/2.73” GR to 7582’ RKB –no problems. Tubing punch from 5224’–5230’ RKB. * 09/2007 –Last Tag @ 7823’ w/SBHP Survey. 2.02” GR ran to 7855’ on 7/27/05. *1984 –Pulled Tbg & found hole in collar which was causing communication to Tbg annulus. * 03/1993 –Passed MIT to 2000 psi on 3.5” X 7” for 30 min. * Could not pump into 9-5/8” to freeze protect on 9/9/05. FISH Below Retainer –Wireline Tools @ 8442’ Perforation Data Top Bottom Pool Info 5,310’ 7,275’Tyonek A, B, C, E, F Pools Cement Squeezed 7,375’ 7,765’ Tyonek G-1, 2, 3 Cement Squeezed 7,785’ 8,405’ Tyonek G-4 OPEN 8,440’ 9,120’ Tyonek G-5 Below CMT Retainer PBTD =8437’ TD = 9215’ MAX HOLE ANGLE = 6O @ 7918’MD/7910’TVD 6 36” 400’ 6935’ Liner Hanger RKB: MSL = 101’ Mudline= 203’ Water Depth= 102’ 7” 9168’ 7785’ – 8405’ Open perfs 1 5 3790’ TOC CBL 7525’ OTIS BWH Packer 8437 EST CMT Retainer 20” 1003’ 13-3/8” 1987’ 5419’ MGS Oil Top BHT = 125 @ 7800’ TVD Pore Press = 3100 psi @ 7800 MD (7.6 ppg EMW) 8445’ CSG Collapse 5263’ OTIS BWH Packer 7823’ Tag Fill 9/2007 9-5/8” 7151’ Perfs Squz 5310’ - 6825’ Perfs Squz 7080’ – 7765’ Tbg Punch 5224’ – 5230’ 4198’ TOC Calc 4529’ MGS Gas Base 26 bbls cement Est TOC ~7000’ 3 4 X 2 XAXX 9.8 ppg brine KB: MSL Mean Sea Level Mud Line ADL: 0017595 PTD: 164-006 Leg 5, Slot 1 API: 50-733-10070-00 KLU A-1 Well Head Rig Up 1 1 1 1 4 1/16" 15K Lubricator - 10 ft 100" Gooseneck HR680 Injector Head 4 1/16" 10K Flow Cross, 2" 1502 10k Flanged Valves 4 1/16" 15K Lubricator - 10 ft API Flange Adapter 10K to 5K for riser/wellhead Hydraulic Stripper 4 1/6" 15K API Bowen CB56 15K 4 1/16" 10K Combi BOPs Blind/Shear Ram Pipe/Slip Ram 4 1/16" 10K bottom flange 4 1/16" 5K flanged Riser - 10 ft if necessary • • Schwartz, Guy L (DOA) From: Juanita Lovett <jlovett @hilcorp.com> Sent: Monday, April 29, 2013 8:05 AM To: Daniel Taylor, Schwartz, Guy L (DOA) Cc: Ted Kramer Subject: RE: Ba -4 Tubing Patch �l 164(---664 Attachments: 10 -404 - Baker Ba -04 - Submitted 04- 29- 13.pdf Good morning Guy, Here's a copy of the 10 -404 that will be delivered to your office via courier today. Thanks, Juanita Lovett Sr. Operations /Regulatory Tech Hilcorp Alaska, LLC 3800 Centerpoint Drive Suite Anchorage, MAY 14 2013 Ancrage, AK 99503 Office: (907) 777 -8332 Email: oven.: , iic : . From: Daniel Taylor Sent: Monday, April 29, 2013 7 :50 AM To: guy_ ei;t.v<1r < w .a3 Ska.gov Cc: Juanita Lovett; Ted Kramer Subject: Ba-4 Tubing Patch Guy, I am writing in reference to: • Sundry: 313 -100 • PTD: 164-006 I wanted to make you aware of the situation behind the 10-404 form we will be submitting today for Ba-4. Ba-4 was to have tubing punch holes over the interval 5,224 ft to 5,230 ft covered by a tubing patch. However, correct Slick Line setting depth of the patch was over the interval 5,243 ft to 5,258 ft. As a result, communication between the tubing and casing remains. Several attempts were made to remove and reset the patch over the tubing punch holes. All attempts were unsuccessful due to debris and paraffin buildup. Ba-4 remains shut in. Regards, Dan Taylor Operations Engineer Hilcorp Alaska, LLC. 0: 907 - 777 -8319 C: 907 -947 -8051 1 RECEWED STATE OF ALASKA APR 2 9 20 ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS AOGCC 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Perforate ❑ Other El Install Patch ✓` Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended Well❑ 2. Operator ✓ 4. Well Class Before Work: ✓ 5. Permit to Drill Number: ✓ Name: Hilcorp Alaska, LLC Development ❑ Exploratory ❑ 164 -006 3. Address: 3800 Centerpoint Drive, Suite 100 Stratigraphic❑ Service El 6. API Number: ✓ Anchorage, AK 99503 50- 733 - 10070 -00 7. Property Designation (Lease Number): be 8. Well Name and Number: • ADL0017595 MGS St 17595 -04 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): ✓ Middle Ground Shoal / E,F and G Oil and A Oil Pool 11. Present Well Condition Summary: Total Depth measured 9,215 feet Plugs measured 8,467 feet true vertical 9,202 feet Junk measured 7,823 feet Effective Depth measured 7,823 feet Packer measured 5,263 & 7,525 feet true vertical 7,816 feet true vertical 5,259 & 7,519 feet Casing Length Size MD TVD Burst Collapse Structural 400' 36" 400' 400' Conductor 1,003' 20" 1,003' 1,002' 1,530 psi 520 psi Surface 1,987' 13 -3/8" 1,987' 1,986' 2,730 psi 1,130 psi Intermediate 7,151' 9 -5/8" 7,151' 7,146' 3,520 psi 2,020 psi Production 9,066' 7" 9,215' 9,202' 6,340 psi 3,830 psi Liner Perforation depth Measured depth 7,785' - 8,405' feet SCANNED MAY 0 3 2013 True Vertical depth 7,779' - 8,397' feet Tubing (size, grade, measured and true vertical depth) 3 -1/2" 9.2# / N -80 7,560' (MD) 7,555' (TVD) Otis BWH Pkr 5,263' (MD) 5,259' (TVD) Packers and SSSV (type, measured and true vertical depth) Otis BWH Pkr 7,525' (MD) 7,519' (TVD) SSSV / NA 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 0 0 Subsequent to operation: 0 0 0 130 0 14. Attachments: 15. Well Class after work: ✓ Copies of Logs and Surveys Run Exploratory❑ Development Service El Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: 1 Oil ❑ Gas ❑ WDSPL❑ GSTOR ❑ WINJ El WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: ✓ 313 -100 Contact Dan Taylor Email dtaylor( hilcorp.com Printed Name Dan Tayl • Title Operations Engineer Signature /i�� ' — Phone (907) 777 -8319 Date 4/29/2013 Form 10 -404 Revised 10/2012 RBDMS MAY -1101- S‘ 5-11-.1 3 g` y S ubmit Origin I • SCHEMATIC Baker Ba -04 N Middle Ground Shoal Last Completed: 02 -16 -1993 (Injection Well since 1974) RKEt MSL =101' Mudi ne= Water Depth= 102 t 1 KB: MSL ADL: 0017595 PTD: 164 -006 e Mean Mud Sea Line Level Leg 5, Slot 1 API: 50- 733 - 10070 -00 36" 400' Size Type Wt/ Grade/ Conn ID Top Btm Cement CMT 411 N. Sacks Top ?o 36" Structural 34" 400' I 20" Conductor 94 / H-40 19.124 surf 1,003' 1500 (Calc 4 Qii 13 -3/8" Surface 54 & 61 / J -55 12.515 surf 1,987 '2s^ 2500 Surf 13 -3 / 8 " 36, 40, 43.5 / 4443 ' 1987 9 -5/8" Intermediate J_55 & N -80 8.755 surf 7,151' 765 (CaIc) 7" Prod Liner 23, 26 / N -80, S -95 6.366 6,935' 9,215' 1400 6935 9.8 23 / N- 80 ................... .................. 3,510' 6,934' ....._..____ ................................... ................_.............. ppg 7" Tie -back 26 /N-80 . ............................... ...._ 1,322' 3790 (CBL) ,322' 3,510' 525 79 brine 29 / S -95 6.184 149' 1,322' 3790' . - TOCGEL Completion 3 -1/2 Prod Tubing 9.2 #, N80 BTC 32.0' 7,560' 4443' TOG CzIr Completion Jewelry Detail Tbg Punch 5224' -5230 # Depth Length ID OD Item 1 Installed Itg 149' 7" Tieback casing hung at 150' in Underwater wellhead. Qi1S5&,3, 2 ` 5243 -5258' 1 5,232' 1.37 2.813 3.96 OTIS "X" Nipple Packer 2 5,263' 4.52 4 0 5.875 OTIS "BWH" Packer 5305' 3 7,482' 4.10 2.813 4.450 OTIS "XA" Sleeve (opens up) ai Top GAG Pelis SIIIIIz 4 7,525' 4.0 4.0 5.875 OTIS "BWH" Packer 0' 6825 5 7,547' 1.37 2.813 3.96 OTIS "X' Landing Nipple . 6 7,557' 0.65 2.990 5.5 Re -Entry Guide 8,445' Damaged Casing assumed to be collapse (2/93) * 10/2010 — Circ 9.8 ppg brine in tubing and annulus. Pumped 36 bbl LCM pill. Has diesel cap. * 10/2010 — RIH w/2.73" GR to 7582' RKB — no .roblems. Tubin. • unch from 5224' — 5230' RKB. Liner � � " . * 09/2007 — Last Tag @ 7823' w /SBHP Survey. 2.02" GR ran to 7855' on 7/27/05. * 1984 — Pulled Tbg & found hole in collar which was causing communication to Tbg annulus. * 03/1993 — Passed MIT to 2000 psi on 3.5" X 7" for 30 min. / * Relief valve installed on 9 -5/8" during active injection. Set at 1500psi. Still installed ?? 95/8 * Could not pump into 9 -5/8" to freeze protect on 9/9/05. 3 * Drilled off "the old minimum self- contained platform ". ,.__,\*1) 7525 ')j 4 FISH Below Retainer — Wireline Tools @ 8442' OTIS RAMPadca (\J Perfs Sq z Perforation Data 5 x 7080' - 7765 L 6 Top Bottom Pool Info 7785 = _ _ Tyonek A, B, C, E, OPeu Pe,t = 7823'Tag 5,310' 7,275' F Pools Cement Squeezed _i,' Fill 92007 ;� 7,375' 7,765' Tyonek G -1, 2, 3 Cement Squeezed 8437 EST . 7,785' 8,405' Tyonek G -4 OPEN CMT Retairrer _ 84, CSG y 7 = 8,440' 9,120' Tyonek G -5 Below CMT Retainer 7"L •. BHT = 125 @ 7800 TVD 9168' + Pore Press = 3100 psi (0 7800 MD (7.6 ppg EM PBTD .43T TD = 9215' MAX HOLE ANGLE = 6 @ 7918' MD/7910'TVD Updated by: JLL 02/26/13 Hilcorp Alaska, LLC Hilcorp Alaska, LLC Well Operations Summary Well Name API Number Well Permit Number Start Date End Date 8A -04 50- 733 - 10070 -00 164 -006 3/1/2013 3/28/2013 Daily Operations: 3/1/2013 Nipple up flange on BA -4 Standby for Sunday /State approval R/U W /L -PT wellbore -good RIH w/2.7" GR w /Tubing Tail Locator -tag fill at 7760' KB pull up to 7541' KB locate tubing tail pooh RIH w/2.85" LIB tag fluid at 1300' KB set down several times WT to 1700' KB pooh, no impressions 1.2 cups paraffin on LIB RIH w/2.80" GR tag X- Nipple at 5257' WLM flag wire pooh RIH w/3.5" GS w/3.5 AD -2 Stop to 5258' WLM set pooh RIH w/3.5" GS w/12' Patch Pipe to 5258' WLM set pooh RIH w/3.5" GS w/12' Patch Pipe to 5246' WLM set attempt to shear could not - attempt to pull -call supervisor -WT for 3 hrs. came free pooh -ooh w /GS full of paraffin R/D W /L- secure well 3/2/2013 R/D W /L- secure well for night TGSM cut 50' wire R/U W /L -PT -good RIH w/3.5 GS w/3.5 A Stop to 5243' KB set pooh -ooh GS not sheared w/A Stop not sheared C/O Spange repin tool RIH w /same to 5243' set pooh, ooh GS sheared R/D W/L Assist w /MIT 3/21/2013 Rig up w/I PT well bore- good RIH w/3 1/2" GS to 391' WLM W/T could not pass PIIH OOM not sheared GS has some debris - scale, paraffin RIH w/ 2.75 G -ring to 391' WLM W/T Pass to 5200' WLM POOH RIH w/ 3 1/2 GS to 5215 WLM WT 501b over pull POOH OOH w /GS RIH w /same to same wt latch POOH OOH w/ A Stop R/H w /same to 5217 wt latch POOH OOH w /stringer pipe Rig down and standby for boat RIH w /same to 5229 win WT latch POOH to 5150' pull through to 5100' KB pull through to 5025 KB W/T Loose weight POOH OOH W /Gas- Sheared RIH w /same (steel pin) to same latch W/T 2x12001b jar Ticks come free POOH OOH w /stringer pipe RIH w /same to 5239 WLM W/T attempt to latch, slip off multiple times POOH OOH w /GS pin not sheared Hilcorp Alaska, LLC Hilcorp Alaska, LLC Well Operations Summary Well Name API Number Well Permit Number Start Date End Date BA -04 50- 733 - 10070 -00 164 -006 3/1/2013 3/28/2013 3/22/2013 Rig up W/L RIH w/ 2.25" Pump Bailer to 5230' WLM WT POOH OOH 4 Cup Scale RIH w/ 3 1/2" GS WT latch 12001b jar lick slip off- latch continue to slip off POOH OOH not sheared RIH w/2.25" Pump Bailer to 5230' WLM W/T POOH OOH w/ 2 cups RIH w/ same to same W/T POOH 00H w/ 1/4 cup scale RIH w/ GS to 5230' WLM W/T latch slip off POOH no shear RIH w/ 2.25 pump bailer to 5230 WLM W/T POOH 1 cup scale RIH W /GS to 5230' WLM (add knuckle) latch 8 OJ licks from 12001b up to 18001b Move top sheave down 3 ft work tools -lose spangs 30 oil jar Ticks still not free cannot shear - call supervisor- decide to pump down tubing- standby - unsuccessful Standby for tools to be flown out Tools arrive- safety and procedure meeting Shut rams on W/L valves break off lub. Attach cutter bar drop bar cut wire at rope socket all wire indicated retrieved Secure well for the night 3/23/2013 RIH w /2" JDC to 5215' WLM W/T POOH 00H No prong no shear RIH w /same to same W/T latch POOH OOH w/ cutter bar Rig down W/L standby for crane Maintenance Rig up W/L RIH w/ 25" RB w/2.7" Skirt 3220 latch W/T Down attempt pull 3 spang licks POOH - Sheared RIH w /2.5" JDC to 5220' WLM latch 12 spang & 3x18001b jar shear off POOH OOH Spangs have scale stuck open. RIHw /same to same, WT no latch pooh ooh JDC has debris from rubber RIH w/ same to same latch -slip off- lose spangs- POOH -OOH Scale inside spangs RIH w/ 2.25 "x 5 pump bailer to 5220' ab w/t pooh ooh 1/2 FULL SCALE RIH w/ same to same W/T POOH 00H W/ 1 cup scale RIH W/ 2.5" JDC to 5220' WLM no latch POOH OOH Sheared RIH w/ 2.25 "x5 pump bailer to 5221' WLM WT POOH OOH 1/2 full scale RIH w /same to same WT POOH 00H w/ 1/3 full scale RIH w/ same to same WT POOH OOH w/1/4 full scale RIH w/ same to same WT POOH OOH w/1/3 full scale RIH w /same to same WT POOH OOH w /same Hilcorp Alaska, LLC Hilcorp Alaska, LLC Well Operations Summary Well Name API Number Well Permit Number Start Date End Date BA -04 50- 733 - 10070 -00 164 -006 3/1/2013 3/28/2013 3/24/2013 Rig up scale ORIH w/2.25 Pump Bailer to 5220' WLM W/S POOH 1/4 full RIH w /same to same W/T POOH 1/4 full RIH W/ same to same W/T POOH OOH w/ 1/3 Full RIH w /same to same W/T POOH OOH w/ 1/4 full RIH w /same to same W/T POOH OOH w /empty RIH w/ 2.5" 11B to 5220' WLM W/T POOH OOH w/ clean rope socket RIH w/ 2.5" JDC to 5220' WLM W/T 24 spang & 3 Jar Licks at 1500 shear POOH OOH w /sheared JDC - damaged dogs RIH w/ same to same no latch POOH OOH w /sheared w/ rubber RIH w/2.25 "x5 Pump Bailer to 5220' WLM WT POOH OOH 1 cup RIH w/ same to same WT POOH OOH w/ empty RIH w/2.5" JDL to 5220' WLM WT no latch POOH Reconfigure tool string (knuckle jar on bottom) RIH w/ same to same latch WTB spangs 12 -jar- licks- attempt to shear off loose spangs could not shear 5 jar licks come free POOH OOH w/ broke skirt on JDC Rig down W/L secure well for the night 3/25/2013 RIH w/2.5" JDC to 5220' WLM WT latch slip off pooh -ooh sheared 1 broke dog RIH w/2.5" RB w/2.7 Skirt to 5220' WLM WT latch 3 OJ licks shear pooh RIH w/2.5" JDC to 5220' WLM WT latch slip off pooh -ooh sheared 1 broke dog RIH w /same to same WT latch 34 oil jar licks at 1800 Ibs work spangs for 30 mins -lose spangs paraffin /scale stuck in spangs, bottom oil jars & spangs visible shear off pooh ooh sheared RIH w /same to same WT latch WT 25 oil jar licks- bottom set of jars work occasionally -lose spangs WT down shear off pooh, ooh sheared L/D Lub cut 50' wire reconfigure tool string - RS,Stem,Stem,Spangs, KJ, OJ, Spangs RIH w/2.5" JDC to 5220' WLM WT latch 3 spang Ticks lose spangs 25 oil jar Ticks at 1800 Ibs attempt to shear after 30 mins gain spang action shear tool pooh ooh w /sheared Standby- discuss w /supervisors- decide to dump bail acid R/D W /L- secure well for night 3/26/2013 R/U W/L RIH w/2.25" x 11' Pump Bailer w/1.25 gallons acid (see MSDS) to 5220' WLM WT dump acid pooh ooh empty- sheared RIH 5 times w /same to same pooh ooh w /same RIH w/2.5" JDC to 5220' WT latch slip off after 800 Ib over pull lose spangs latch 1000 Ib over pull slip off pooh ooh w /sheared RIH w /same to same WT no latch pooh ooh w /sheared Hilcorp Alaska, LLC Hilcorp Alaska. LLC Well Operations Summary Well Name API Number Well Permit Number Start Date End Date BA -04 50- 733 - 10070 -00 164 -006 3/1/2013 3/28/2013 3/27/2013 Rig up W/L RIH w/2.25 "x5 pump bailer to 5220' WLM WT POOH OOH 1/3 full scale RIH w /same to same WT POOH OOH w/1/4 full soft scale RIH w/ same to same WT POOH OOH w/ 1/2 full scale RIH w /same to same WT POOH OOH w/ 1/4 full scale RIH w /same to same WT POOH OOH w/ 1 cup scale RIH w /same to same WT POOH OOH w/ 1/2 cup Reconfigure tool string add 2.25 centralized above and below spangs RIH w/ 2.25 JDL to 5220' WLM WT latch 3x 18001b jar licks slip off. WT no latch POOH OOH Sheared RIH w/ same to same WT slip off POOH sheared RIH w /same to same latch -WT spangs 45 min WT oil jar 20x18001b licks- ship off cannot relatch, POOH, Sheared RIH w/ 2.5" ebrace HD pulling tool to 5220' WT latch pull 15001b oil jar lick slip off WT latch 24 spang licks slip off could not relatch POOH OOH not sheared RIH w/2.5" E -brace releasable overshot- to 5220' WLM WT latch pull 18001b oil jar lick slip off WT latch spang 45 min slip off POOH 3/28/2013 Rig up W/L RIH W/ 2.5" E -brace releasable overshot -to 5211' WLM WT no latch POOH W/ not sheared- scale on tool RIH w/ 2.25x5' Pump Bailer to 5211' WLM WT POOH OOH W/ 1/4 scale RIH W/ same to same WT POOH OOH W/ full scale wet RIH w /same to same WT POOH OOH w/ full scale/ paraffin RIH w /same to same WT POOH OOH w /full RIH w /same to 5213 WT POOH OOH w /full bailer RIH w /same to 5214 WT POOH OOH w /full bailer RIH w /same to same POOH 000H w /full bailer RIH w/ same to same WT POOH OOH w/ full bailer RIH w /same to same WJ POOH OOH w /full bailer RIH w /same to same WT POOH OOH w /full bailer RIH down W/L secure well clean up area • • w w�� \ \I %%'s THE STATE Al Oil and Gas F '` "' °f ALASJL'�1 1 Conservation Commission GO VERNOR SEAN PARNELL ,�,. 333 West Seventh Avenue 0.A; .0,. np 1 L � Anchorage, Alaska 99501 -3572 ��pN�eo � IH" Main: 907.279.1433 Fax: 907.276.7542 Chet Starkel Asset Team Leader Hilcorp Alaska, LLC I t JO ©0 3800 Centerpoint Drive, Suite 100 Anchorage, AK 99503 Re: Middle Ground Shoal Field, A, E, F, and G Oil Pool, MGS St 17595 -04 Sundry Number: 313 -100 Dear Mr. Starkel: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cat . Foerster U Chair DATED this � d y of March, 2013. Encl. . • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 MC 25.280 1. Type of Request: Abandon ❑ Plug for Redrill ❑ Perforate New Pod ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -enter Susp. Well ❑ Stimulate ❑ After Casing ❑ Other: Install Tubing Patclfl' 2. Operator Name: 4. Current Well Class: 5. Permit to DriN Number: Hilcorp Alaska, LLC Exploratory ❑ Development ❑ 164-006 - 3. Address: 3800 Centerpoint Drive, Suite 100 Stratigraphic ❑ Service 0 • 6. API Number. Anchorage, AK 99503 50- 733 - 10070 -00 - 7. If perforating: 8. Well Name and ` �lY� , D What Regulation or Conservation Order governs well spacing in this pool? N/A Will planned perforations require a spacing exception? Yes ❑ No ❑ MGS St 17595-04 • aEP 2 ‘ o ` Z 9. Property Designation (Lease Number): 10. Field /Pool(s): ADL0017595 % Middle Ground Shoal / E,F and G Oil and A Oil Pool . T. S 11. PRESENT WELL CONDITION SUMMARY A C V Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth ND (ft): Plugs (measured): Junk (measured): • 9,215 9,202 . 7,823 7,816 8,467 • 7,823 Casing Length Size MD TVD Burst Collapse Structural 400' 36" 400' 400' Conductor 1,003' 20' 1,003' 1,002' 1,530 psi 520 psi Surface 1,987' 13 -3/8" 1,987' 1,986' 2,730 psi 1,130 psi Intermediate 7,151' 9 -5/8" 7,151' 7,146' 3,520 psi 2,020 psi Production 9,066' 7" 9,215' 9,202' 6,340 psi 3,830 psi Liner Perforation Depth MD (ft): Perforation Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 7,785' - 8,405' . 7,779' - 8,397' 3 -1/2" 9.2# N -80 7,560' Packers and SSSV Type: Packers and SSSV MD (ft) and ND (ft): 2xOtis BWH Packers and N/A SSSV Pkrs 5,263' (MD) 5,259' (ND); 7,525' (MD) 7,519' (ND) and N/A SSSV 12. Attachments: Description Summary of Proposal El . 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development ❑ Service El 14. Estimated Date for 15. Well Status after proposed work: 3/4/2013 Commencing Operations: Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: WINJ El • GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Ted Kramer Email tkramerna.hilcorp.com Printed Name Chet Starke) Title Asst Team Leader Signature r," 7 9 r Phone 907 777 -8344 Date 2/26/2013 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: t /i V Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test Location Clearance ❑ Other: G � . r�f�ess 2 I 7.-- ' Z , REM MS MAR 0 5 10 Spacing Exception Required? Yes ❑ No Eli Subsequent Form Required: /0 — II Y 4_�� APPROVED BY Z Approved by: COMMISSIONER THE COMMISSION Date: 3 1� - / J L 3 `? Submit Form and 1 Qof4Ote / 01 Approved application i valid for 12 months from the date of approval. Attachments in Duplicate \��N • • Well Prognosis Well: MGS ST 17595-04 Hilcorp Alaska, LL V \ &e Date: 2/26/2013 Well Name: MGS ST 17595 -04 (Ba -04) API Number: 50- 733 - 10070 -00 Current Status: SI Injector Leg: 5 Estimated Start Date: Mar 4 2013 Rig: Reg. Approval Req'd? 403 Date Reg. Approval Rec'vd: Regulatory Contact: Juanita Lovett 777 -8332 Permit to Drill Number: 164 -006 First Call Engineer: Ted Kramer (907) 777 -8420 (0) (907) 229 -4824 (M) Second Call Engineer: Reid Edwards (907) 777 -8421 (0) (907) 250 -5081 (M) AFE Number: Current Bottom Hole Pressure: — 2954 psi @ 7401' TVD (SBHP measured 9 -3 -2007) Maximum Expected BHP: — 2954 psi @ 7401' TVD Max. Allowable Surface Pressure: — 0 psi (based on 0.44 psi /ft gradient to surface) Brief Well Summary This well was drilled and suspended in 1964 as a standalone well. It was then completed as an oil producer in the Hemlock G zones after the platform was set in 1966 and put on production. A workover was performed in 1974 to convert the well to water injection. Subsequent workovers we performed to isolate selected Hemlock G zone intervals and attempt to remediate damage casing in1980 and 1993, respectively. Ba -04 received intermittent injection from 1993 up until the platform was SI in 2003. In October 2010 the well was circulated with 9.8 ppg brine and — 40 bbl LCM CaCO3 pill pumped into the formation. As part of the kill operations, (''V) tubing was punched from 5224'- 5230'MD in order to circulate the brine into the 7" tie back liner. The well has ;if.) 3 remained SI since 2003. ^‘‘' The current plan is to install a tubing patch across the tubing punched interval in order to isolate tubing X IA communication. Once the patch is set an MIT IA will be performed to prove up pressure integrity. If integrity is confirmed the well will be returned to injection. Brief Procedure: 1. MIRU a -line unit. 2. Drift and tag to ensure open tubing and access to perforations 3. RIH and set permanent patch across punched tubing interval of 5224' -5230' MD 4. Perform MIT IA to prove pressure integrity 5. Return well to injection Attachments: 1. As -built Well Schematic 2. Proposed Schematic . • • II SCHEMATIC Baker Ba -04 N Middle Ground Shoal Last Completed: 02 -16 -1993 (Injection Well since 1974) RIB: MSL =101' MdIine=20 ' water Depth= 102 I KB: MSL ADL: 0017595 PTD: 164 -006 _ _Mean Sea Level Mud Line Leg 5, Slot 1 API: 50- 733 - 10070 -00 I s Size Type Wt/ Grade/ Conn ID Top Btm Cement CMT Ad Sacks Top 1 W 3 36" Structural 34" 400' • ...................................................................................................................................................................._................................................................................................................................_....................................... ..................._..__.._.... ............... 20" Conductor 94 / H-40 19.124 surf 1,003' 1500 (Galt) 4 ( � 13 -3/8" Surface 54 & 61 / J -55 12.515 surf 1,987 2500 Surf 13-3/8" 36, 40, 43.5 / 4443 1967' 9 -5/8" Intermediate J 55 & N -80 8.755 surf 7,151' 765 (talc) 7" Prod Liner 23, 26 / N -80, S -95 6.366 6,935' 9,215' 1400 6935 9.s 23 / N- 80 ... ............................... .._ 6,934' .......................... ............................... PP9 7" Tie -back 26/ 3790 N- 80 ............ ........................._ 1,322' 3,510' 525 (CBL) trine 29 / S -95 6.184 149' 1,322' 3790' T°CCBI_ Completion 3 -1/2 Prod Tubing 9.2 #, N80 BTC 32.0' 7,560' 4443 TOC Ca, Completion Jewelry Detail T6gPurch 5224'_5230 # Depth Length ID OD Item 1 149' 7" Tieback casin • hun• at 150' in Underwater wellhead. OnS@NH 2 ! 1 5,232' 1.37 2.813 3.96 OTIS "X" Nipple Packer _ ., 2 5,263' 4.52 4.0 5.875 OTIS "BWH" Packer 5 - 3 7,482' 4.10 2.813 4.450 OTIS "XA" Sleeve (opens up) OITop ' Pert S4z 4 7,525' 4.0 4.0 5.875 OTIS "BWH" Packer 53,0' -6875 5 7,547' 1.37 2.813 3.96 OTIS "X" Landing Nipple . 6 7,557' 0.65 2.990 5.5 Re -Entry Guide j 8,445' Damaged Casing assumed to be collapse (2/93) R ? 4 * 0 — Circ 9.8 ppg in tubing annulus. Pumped 36 L pill. s diesel cap. * 10/201 — RIH w/2.73" GR to 7582' RKB — no problems. Tubing punch from 5224' — 5230' RKB. tales 69'5 r * 01199//822400210p — Last Tag @ 7823 ' w /SBHP Survey. 2.02" GR ran to 7855 ' on 7/27/05. Ha die * ulled Tbg & found hole in collar which and was causing communication CM to Tb annulus. * 03/1993 — Passed MIT to 2000 psi on 3.5" X 7" for 30 min. t.J o . * Relief valve installed on 9 -5/8" during active injection. Set at 1500psi Still installed ?? 9 -55 "L * Could not pump into 9 -5/8" to freeze protect on 9/9/05. 3 , * Drilled off "the old minimum self- contained platform ". 7525' ' 7 4 �/ FISH Below Retainer — Wireline Tools @ 8442' OTIS 1334 -1 Packer /� — Pert Perforation Data 5 • 7030' -7764 6 Top Bottom Pool Info 7785' -8405' _ = Tyonek A, B, C, E, Open Peril - - 5,310 7,275' Cement Squeezed 7823' Tag a F Pools y Fi 92007 _ 7,375' 7,765' Tyonek G -1, 2, 3 Cement Squeezed 8477''' CMT Retainer 7,785' 8,405' Tyonek G -4 OPEN �, w, aaas csc 7 = Cops" 8,440' 9,120' Tyonek G -5 Below CMT Retainer 7 'L .A eir= 125 @78c0TW 9168' Pore Press .3100 psi@ 7800 MD (7.6 ppg EMJV) PBTD =8437' TD =9215 MAX HCLE ANGLE =6 @7918'MD/79101VD Updated by: JLL 02/26/13 • • II PROPOSED Baker Ba -04 N Middle Ground Shoal ,, " A1 " pka, ,,. 1 Last Completed: 02 -16 -1993 (Injection Well since 1974) RKB: MSL =101' Mudline=207' Water Depth 107 1 1 KB: MSL ADL: 0017595 PTD: 164 -006 _Mean Sea Level _ Mud Line Leg 5, Slot 1 API: 50- 733 - 10070 -00 lir 36" 400 Size Type Wt/ Grade/ Conn ID Top Btm Cement CMT N. Sacks Top 20" 1003' 36" Structural 34" 400' 20" .................._............ Conductor ........... .............................94 / H-40 19.124 _.......... surf .._................._... .......................... 1500 ._.................. ............................... 217 Qu 13 -3/8" Surface 54.5 & 61 / J 55 12.515 surf 1,987 '2.5" 2500 Surf 13-3/8" 36, 40, 43.5 / 4443 1987' 9 -5/8" Intermediate J_55 & N -80 8.755 surf 7,151' 765 (caIc) 7" Prod Liner 23, 26 / N -80, S -95 6.366 6,935' 9,215' 1400 6935 9.8 23 / N- 80 ... ............................... .._6.366................_3,510' 6934' PRIg _ ......................................... ............................... 7" Tie -back 26/ N- 80 ... ............................... .._ 3790 ................_1,322' 3,510' 525 (CBL) brine 29 / S -95 6.184 149' 1,322' 3730' - T°CCFI Completion 3 -1/2 Prod Tubing 9.2 #, N80 BTC 32.0' 7,560' 4443' TOC CaI, �;"' Completion Jewelry Detail 5224 -5230' # Depth Length ID OD Item 1 149' 7" Tieback casing hung at 150' in Underwater wellhead. OTIS5 2 `,' 1 5,232' 1.37 2.813 3.96 OTIS "X" Nipple Packer 1 1 2 5,263' 4.52 4.0 5.875 OTIS "BWH" Packer 5305' 3 7,482' 4.10 2.813 4.450 OTIS "XA" Sleeve (opens up) C51 Top CAC ' Perfs Sq. 1 4 7,525' 4.0 4.0 5.875 OTIS "BWH" Packer 5310 6825 5 7,547' 1.37 2.813 3.96 OTIS "X" Landing Nipple 6 7,557' 0.65 2.990 5.5 Re -Entry Guide 8,445' Damaged Casing assumed to be collapse (2/93) 91 * 10/2010 – Circ 9.8 ppg brine in tubing and annulus. Pumped 36 bbl LCM pill. Has diesel cap. * 10/2010 – RIH w/2.73" GR to 7582' RKB – no problems. Tubing punch from 5224' – 5230' RKB. 6935' _,. * 09/2007 – Last Tag 7823HP Survey. 2.02" GR ran to 7855' on 7/27/05. ❑ner Hanger ` g @ ' w /SB __. — _.... Y• * 1984 – Pulled Tbg & found hole in collar which was causing communication to Tbg annulus. * 03/1993 – Passed MIT to 2000 psi on 3.5" X 7" for 30 min. * Relief valve installed on 9 -5/8" during active infection. Set at 1500psi. Still installed?? 9-5/r / , * Could not pump into 9 -5/8" to freeze protect on 9/9/05 7151' ■ 3 x * Drilled off "the old minimum self- contained platform ". 7525 ,� .r. FISH Below Retainer – Wireline Tools @ 8442' OTIS HSA dr 4 Paer y ,[� - = Perforation Data 5 L.. ,_ 7oeo' -nss 6 Top Bottom Pool Info 7786' -8405 Tyonek A, B, C, E, Open penh • --- 5,310 7,275' Cement Squeezed 7823 Tag F Pools . . F,1192007 7,375' 7,765' Tyonek G -1, 2, 3 Cement Squeezed 3437 EST , CMT Retainer , . ,.,1_,,: „ * ,445, csG 7,785' 8,405' Tyonek G -4 OPEN Collapse 8,440' 9,120' Tyonek G -5 Below CMT Retainer T' 4 BHT =125 (07800 ND 9198' Pore Repo =3100 psis 7800 MD (7.6 ppg ETvel PBTD =8437' TD= 9215' MAX HOLE ANGLE = 6 @ 7918' MD17910'TVD Updated by: JLL 02/26/13 ~ STATE OF ALASKA ALASKSL AND GAS CONSERVATION COMMIS. REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon 1 Repair Well LJ Plug Perforations Li Stimulate LJ Other U Cancel Procedure Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver ❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator Union Oil Company of Califomia 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development ❑ Exploratory ❑ 164 -006 3. Address: PO Box 196247, Anchorage, AK 99519 Stratigraphic III Service 0 6. API Number: 50- 733 - 10070 -00 — OO 7. Property Designation (Lease Number): 8. Well Name and Number: ADLoo17595 [Baker Platform] MGS ST 17595 04 — 9. Field /Pool(s): Middle Ground Shoal Field/ E, F and G Oil & A Oil Pool 10. Present Well Condition Summary: Total Depth measured 9,215 feet Plugs measured 8,467 feet true vertical 9,202 feet Junk measured 7,823 feet 5,263 Effective Depth measured 7,823 feet Packer measured 7,525 feet 5,259 true vertical 7,816 feet true vertical 7,519 feet Casing Length Size MD TVD Burst Collapse Structural 400' 36" 400' 400' 1,490 psi 520 psi Conductor 1,003' 20" 1,003' 1,002' 3,450 psi 1,950 psi Surface 1,987' 13 -3/8" 1,987' 1,986' 5,750 psi 3,090 psi Intermediate 7,151' 9 -5/8" 7,151' 7,146' 9,690 psi 7,830 psi Production 9,066' 7" 9,215' 9,202' Liner y� Perforation depth Measured depth 7,785 -8,405 feet WANED FEB 0 6 ZO1 True Vertical depth 7,779 -8,397 feet Tubing (size, grade, measured and true vertical depth) 3 -1/2" 9.2 #/ N -80 7,560' MD 7,556' TVD 5,263'MD/ 5,259'TVD Packers and SSSV (type, measured and true vertical depth) 2x0tis BWH Packers 7,525'MD/ 7519'TVD N/A N/A 11. Stimulation or cement squeeze summary: N/A RECEIVED Intervals treated (measured): N/A Treatment descriptions including volumes used and final pressure: N/A JAN 2 7 2012 12. Representative Daily Average Product orAlasibitwa $ Cons. commission Oil -Bbl Gas -Mcf Water -Bbl Casing Pri§®G K race Tubing Pressuie Prior to well operation: 0 0 0 380 psi - 80 -- Subsequent to operation: 0 0 0 0 psi 0 psi 13. Attachments: 14. Well Class after work: Copies of Logs and Surveys Run N/A Exploratory III Development ❑ Service el A Stratigraphic ❑ Daily Report of Well Operations Y 15. Well Status after work: ,. Oil ❑ Gas U WDSPL Li GSTOR ❑ WINJ 0 WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 310 -297 Contact Hilcorp Drilling Dept. at 777 -8301 Printed Name Timothy C. Brandenburg Title Drilling Manager Signature C , ._- — Phone 276 -7600 Date 1/25/2012 r Form 10-404 Revised 10/2010 RB® JAN 2012 3 1 / • , / /?/ / ' Ofr3it — nal Only Chevron • • %10 Chevron - Alaska %. Daily Operations Summary Well Name Legal Well Name Lease Surface UWI ChevNo Original RKB (ft) Water Depth (ft) Ba -04 MGS ST 17595 04 ADL0017595 5073310070 AR4185 75.00 Primary Job Type Job Catego Objective Actual Start Date Actual End Date Well Preparation Well 10/1/2010 10/2/2010 Services Primary Wellbore Affected Wellbore UWI Well Permit Number Ba -04 507331007000 1640060 phi Operations 10/2/2010 00:00 - 10/3/2010 00:00 Operations Summary R/U slickline and pressure test lubricator to 250 psi low/ 2500 psi high. RIH with 2.73" GR to 7582' RKB. R/D slickline. R/U eline and pressure test to 250 psi low / 2500 psi high. RIH and tubing punch 2 holes in tubing from 5,224' - 5,225' RKB. RIH and tubing punch 23 shots from 5,224' - 5,230' RKB. R/D eline. 10/19/2010 00:00 - 10/20/2010 00:00 Operations Summary R/U on lines Ba -04. Pressure test lines to 300psi low and 2000 psi high. Pump 9.8 ppg KWF down tubing taking returns up 9 -5/8" annulus for a total of 222 bbls when good 9.8 ppg KWF returns were seen. Bullhead 30 bbls 9.8ppg KWF @ 465 psi - 1104 psi and shut down. Initial shut in 1104 psi, 1 min: 840 psi, 5 min: 348 psi. Bleed off well. Well on slight vacuum. Pump 36 bbls LCM (CaCO3) pill and chase with 4 bbls KWF. Continue to bullhead LCM pill w/ 53 bbls total 9.8 ppg KWF - 12 bbls LCM pill squeezed into perfs. Initial shut in 1453 psi; 1 min: 1206 psi, 5 min: 668 psi. Well went on vacuum. Secure well. R/D. 10/24/2010 00:00 - 10/25/2010 00:00 Operations Summary R/U on Ba -04. Pressure test lines to 500psi low and 2000 psi high. Pump 50 bbls 9.8 ppg KWF @ 2 bpm& 400 psi. Saw pressure at 28 bbls and got returns at 44 bbls. Had good, clean 9.8 ppg KWF at 50 bbls. Switch to diesel for 5 bbls and pump at 0.5 bpm. Displace at 2 bpm with 40 bbl KWF, 40 bbls LCM pill, 4.5 bbls 9.8 ppg KWF, 1.5 bbls diesel, and finally 1 bbl KWF. Shut down and bleed off pressure. Secure well. R/D. LAIL) 3-11 / / r7-1v . , r ' evro • Offshore Baker Platform Ba -04 ^ Cook Inlet Basin, Alaska `-Middle Ground Shoal " N Middle Ground Shoal Last Completed: 02 -16 -1993 _' (Injection Well since 1974) RIB: MSL =101' Milli ne= 20 niter Depth= 102 Me MSL ADL: 17595 PTD: 164 -006 ,._Mean Sea Level Leg 5, Slot 1 API: 50- 733 - 10070 -00 SI b" f - Mud Line - to. Current Schematic +; Size Type Wt/ Grade/ Conn ID Top I Btm I Cement I CMT 413 Cw Sacks Top 1003 ,( 36" .........................._ Structural 34 " ...._. 4 00' ._..__................. .................._............ _...._._............ 20" Conductor 94 / H-40 19.124 surf 1,003' 1500 217 13_3/8" Surface 54.5 & 61 / J -55 12.515 surf 1,987 'z.s" 2500 Surf 1348 36, 40, 43.5 / 4443 1967 9 -5/8" Intermediate 8.755 surf 7,151' 765 J -55 & N -80 (Calc) 7" Prod Liner 23, 26 / N -80, S -95 6.366 6,935' 9,215' 1400 6935 23 / N -80 6.366 3,510' 6,934' s.s ................_............ ---...................................................................................................................................................... ............._....._........... 3790 Pips 7" Tie -back 26 / N -80 6.276 1,322' 3,510' 525 bnne 29 /S-95 6.184 149' 1,322' 3790' - TOCCBL Completion 3 -1/2 Prod Tubing 9.2 #, N80 BTC 32.0' 7,560' 4443 • ' TOC CC, Completion Jewelry Detail p4'' 5230 # Depth Length ID OD Item 1 149' 7" Tieback casing hung at 150' in Underwater wellhead. ores, . 2 S 1 5,232' 1.37 2.813 3.96 OTIS X" Nipple Packer .l 2 5,263' 4.52 4.0 5.875 OTIS 'BWH" Packer 5 � 3 7,482' 4.10 2.813 4.450 OTIS "XA" Sleeve (opens up) °i Top CAC . • Perk 3rkrz 4 7,525' 4.0 4.0 5.875 OTIS "BWH" Packer 5310 6825 _ 5 7,547' 1.37 2.813 3.96 OTIS "X" Landing Nipple . 6 7,557' 0.65 2.990 5.5 Re -Entry Guide 8,445' Damaged Casing assumed to be collapse 12/93) * 10/2010 - Circ 9.8 ppg brine in tubing and annulus. Pumped 36 bbl LCM pill. Has diesel cap. *10/2010 - RIH w/2.73" GR to 7582' RKB - no problems. Tubing punch from 5224' - 5230' RKB. 60 3 " 09/2007 - Last Tag @ 7823' w /SBHP Survey. 2.02" GR ran to 7855' on 7/27/05. " 1984 Pulled Tbg & found hole in collar which was causing communication to Tbg annulus. " 03/1993 - Passed MIT to 2000 psi on 3.5" X 7" for 30 min. " Relief valve installed on 9 -5/8" during active injection. Set at 1500psi. Still installed'? s ss ° °L *Could not pump into 9-5/8" _to to freeze protect on 9/9/05. 7151' _..... 3 „ " Drilled off "the old minimum self- contained platform ". 7525' \)i 4 FISH Below Retainer - Wireline Tools @ 8442' OTS BM Packer AJ PertScz Perforation Data 5 7060' -7765 -J 6 Top Bottom Pool Info 7765 -8405' _ — Tyonek A, B, C, E, openp.- = - >825Tag 5,310' 7,275' F Pools Cement Squeezed a t Fi 92007 7,375' 7,765' Tyonek G -1, 2, 3 Cement Squeezed 6437 EST J CMT Retainer = 8445 c� 7,785' 8,405' Tyonek G -4 OPEN 7 � G e 8,440' 9,120' Tyonek G -5 Below CMT Retainer T'L BHT = 125@ 9166' Pae Press =3160 psi @ 7800 MD (7 ppg EAMV) PBTD =843T TD =9215' MAXHCLE ANGLE =6 @7918'MD/7910'T1.D WBD Ba -04 1- 252012.doc Page 1 of 1 TDF 1/25/2012 0 ALASKA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMUSSIOIQ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Timothy C. Brandenburg Drilling Manager Union Oil Company of California P.O. Box 196247 Anchorage, AK 99519 Re: Middle Ground Shoal Field, A, E, F 8v G Oil Pool, MGS ST 17595 04 Sundry Number: 310-297 Dear Mr. Brandenburg: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. 16<1 Chair DATED this) 1 day of September, 2010. Encl. Chevron Timothy C Brandenburg Union Oil Company of California Drilling Manager P.O. Box Anchoragee,, AK AK 99519-6247 Ift— A.a Tel 907 263 7657 Fax 907 263 7884 Email brandenburgt@chevron.com ""`Li September 7, 2010 F'0 z Commissioner (61i1 Alaska Oil & Gas Conservation Commission ; t t�,, ,Mission 333 W. 7th Avenue ,. Anchorage, Alaska 99501 Re: Baker Platform Wellbore Abandonment MGS ST 17595 — 04 (Ba -04) Dear Commissioner, Union Oil is preparing to perform wellbore abandonment work on the Baker Platform. The attached sundry is for the "Phase 1" reservoir abandonment of well number 17595- 04. The work scope includes the circulation of kill weight brine which we plan to perform in October 2010, prior to plugging the oil reservoir zones in early 2011. Union Oil is requesting a variance of 20 AAC 25.112 (c) (1) (E) to allow the existing completion packer located at 5263 ft MD, to be used in place o ,�'�echanical bridge plug, at a set height of 47 feet above the existing top yperrlierforated interval. A mechanical plug will be placed in the tubing string below the completion packer, and 300 feet of cement will be displaced inside the tubing string and on top of the packer in the tubing by casing annulus. This variance will allow for the "through tubing" abandonment of the oil pool. The wellbore has production casing/liner annular cement being above the packer, as well as above the top of the oil pool. Union Oil is also requesting a variance of 20 AAC 25.112 (g) (2) to allow the testing of the cement plug to hold a surface pressure of 500 psi, in place of the greater of 1500 psi or 0.25 psi/ft multiplied by true vertical depth. This variance will allow for the testing of the cement plug for leak off to permeable formation, but by testing to a surface pressure of 500 psi over the hydrostatic pressure, the risk of creating a casing integrity issue with the 46 year old casing is greatly reduced. Union Oil appreciates your consideration of this request and looks forward to discussing any questions as needed. Attached is a brief description of the well work procedure, and the current and the proposed wellbore schematics. Please let us know if we can provide any further information by contacting myself at 263-7657 or Mike Quick at 263-7900. Sincerely, Timothy C. Brandenburg Drilling Manager Attachments: Form 10-403 in duplicate, Actual Well Schematic, Proposed Well Schematic, Summary Well Work Procedure Union Oil Company of California / A Chevron Company L1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1 WGA 0'1 `1 3 12,0 to _l4' `4 1. Type of Request: Abandon ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend [e "' Plug Perforations ❑� Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re-enter Susp. Well ❑ Stimulate ❑ Alter Casing ❑ Other: ❑ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Union Oil Company of California Development ❑ Exploratory ❑ Stratigraphic ❑ Service ❑✓ 164-006. 3. Address: 6. API Number: P.O. 196247, Anchorage, Alaska 99519 50-733-10070-00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: Spacing Exception Required? Yes ❑ No 0 MGS ST 17595 04' 9. Property Designation (Lease Number): 10. Field/Pool(s): ADL0017595 [Baker Platform] I Middle Ground Shoal Field / E F AND G OIL & A OIL Pool ' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft):Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 9,215 9,202 7,823 7,816 8,437 7,823 (fill) Casing Length Size MD TVD Burst Collapse Structural 400' 36" 400' 400' - - Conductor 1,003' 20" 1,003' 1,002' 1,490 psi 520 psi Surface 1,987' 13-3/8" 1,987' 1,986' 3,450 psi 1,950 psi Intermediate 7,151' 9-5/8" 7,151' 7,146' 15,750 psi 3,090 psi Production 9,066' 7" 9,215' 9,202' 9,690 psi 7,830 psi Liner Perforation Depth MD (ft Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): ` 7,785'-8,405' 7,778'-8,395' 3-1/2" 9.2# N-80 7,560' Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): (2) Otis BWH packers / NA 5,263'MD (5,259'TVD) & 7,525 -MID (7,519 -TVD) / N/A 12. Attachments: Description Summary of Proposal Q 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Development ❑ Service ❑Q 14. Estimated Date for 10/1/2010 15. Well Status after proposed work: Commencing Operations: Oil ❑ Gas ❑ WDSPL ❑ Suspended 5 WINJ C 10y� i` GINJ F]WAG ElAbandoned ❑ 16. Verbal Approval: Date: Commission Representative: �''e GSTOR ❑ SPLUG El 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Marcus Barbee 263-7605 Printed Name re Timothy C. Brandenburg Title Drilling Manager Signature Phone 276-7600 Date COMMISSION USE ONLY Conditions approval: Notify Commission so that a representative may witness Sundry Number: 3/o of Plug Integrity [� BOP Test ❑ Mechanical Integrity Test ❑t Location Clearance E]✓�u Other: f(AAA fP ZO44(„ Zs. I(2 G(,f o—tfe./Kv tC UAe�Axahal&,—t b� "�d�� - _ 'eE'q wA1t � -q P ssu►� }est rtiKe A-PrV \te-J. 11 2010 Subsequent Form Required: (� — Ll ni APPROVED BY Approved by/-��� COMMISSIONER THE COMMISSION Date: Form 10-403 Revised 1/BBDMS SEP 171 1 ORIGINAL Submit in Duplicate , Chevron • . Middle Ground Shoal MGS ST 17595 04 Date: 08-30-10 OBJECTIVE: • To perform well kill and plug open perforations. Note: Plan to perform complete abandonment with follow up sundry. Current BHP= 3,141 psi @ 7,843'TVD. Max DH Pressure= 3,141 psi @ 7,843'TVD (Based on pressure/depth/fluid data to TVD fill tag) 314/ -- l i� = 2357 Max Potential Surface Pressure=1.50 psi (Based on stabilized shut in tubing pressure.) PROCEDURE SUMMARY: Description Summary of Proposal • MIRU pumping and flow back equipment. • RU Eline unit, pressure test lubricator 250psi low/2,500psi high. • Tubing punch ±3' above the X nipple @ 5,232' and circulate well with ±9.6# KWF. • RD Eline unit. • Mix and pump CaCo3 pill. • RU Slickline unit, pressure test lubricator 250psi low/2,500psi high: • Set XX plug in x -nipple @ 5,232'. • RD Slickline unit. t� • Mix and pump a ±300' balanced cement plug (bls) of ±15.8# class "G" cement • WOC and perform charted pressure test cement plug t �50"si for 30 minutes. • RU Slickline unit, pressure test lubricator 250psi low/2,500psi high. • Tag cement and record depth. • RD Slickline unit. Rig down and secure well. MGS ST 17595 04 REVISED BY: CVK 8-30-2010 ft4irw RKB: MSL = 101' Water Deptty- 102' Offshore Baker Platform Ba -04 N Middle Ground Shoal - KB: MSL -Mean Sea Level Mud Line IT = 125@78DU TVD r'9168 Ut P.,e P- - 3100 p. @ 7 800 MD (7 6 ppg EWV) PBTD =8437 TD = 9215' MAX HOLE ANGLE = 6P @ 7918'MYn10'TVD ADL 17595 PTD 164-006 Leg 5, Slot 1 Current Schematic Size Type Wt/ Grade/ Conn ID Top Btm Cement CMT Sacks Top 36" Structural ........................................ 400?? ..... ............... .................... ........................ .. I ..... ........ ................................... ............. .1 . . ....................................... Conductor20" .............................. ............................................................... 94 / H-40 .................. 11 .................. surf 1003 ............. ........................... 1500 ............................. . .......... ? ........................ . ............. 13-3/8" ............................................................... Surface ...... .. I ......................................................... .......................... 54.5 & 61 / J-55 ................................. I ........... .-.11 ..... . ....................... .................................. . . ............. . 11 ....................... surf ....................................... 1987 I ........................................ 2500 ............................................ ? ................................ . .................................................. 9-5/8" ............................................................... Intermediate . ..... . ........ .. 40,43.5/ surf 7151 765 ? J-55 & N-80 ............................ ....... * .................... ... . ............. ..................... ...................... .......... . .. . .............. ProdLiner ............................................ .. ................................. 23, 26 / N-80, S-95 .................................... ........ ... 6935 ....................................... 9215 ......................................... 1400 ............................................ 6935 .................................. ............................................... . .. .......... ............ ... . .................... . .......... .................................. ­­­ ...................................................... 23 N-80 .................. 35106934 ... . ... 7" Tie-back8 0 ................................. . . 11 ......... 1322 ....................................... ... 3 5 1 0 .............. . . . ...................... 525 3790 * * ............................... ................................................. .......... ... .................................................................... . .............. ....... 29/S-95 ......... .................................... ...................... ...................... ............... 149 ........................... 1322 ... ......................... ........................... . .. .. ....... .............................. Completion 3-1/2 Prod Tubing 9.2#, N80 BTC 32.0 7560 Completion Jewelry Detail # Depth Length ID OD Item 7" Tieback casing hung at 150' in Underwater 149 wellhead. 1 5232 1.37 - 2.813 3.96 —OTIS "X" Ni 2 5263 4,52 4.0 5.875 OTIS "BWH" Packer 3 7482 4.10 2.8113 4.450 OTIS "XX Sleeve (opens up) 4 7525 4.0 4.6 5.875 OTIS "BWH" Packer 7547 1.37 2.813 3.96 OTIS "X" Landing Nipple 6 7557 0.65 2,990 5.5 Re -Entry Guide 8445 Damaged Casing assumed to be collapse 2/93 *Pulled Tbg in 1984 & found hole in collar which was causing communication to Tb 9 annulus. • Last Tag @ 7823'w/SBHP Survey on 9/3/07. 2.02" GR ran to 7855' on 7/27/05. • Passed MIT to 2000 psi on IF X 7" for 30 min on 3/1/93. • Relief valve installed on 9-5/8" during active injection. Set at 1500psi. Still installed?? • could no pump into 9-5/8" to freeze protect on 9/9/05 • Drilled off "the old minimum self-contained platform". FISH Below Retainer - Wireline Tools (d) 8442' Perforation Data Top Bottom Pool Info 5310 7275 Tyonek A, B, C, E, Cement Squeezed F Pools 7375 7765 Tyonek G-1, 2, 3 Cement Squeezed 7785 8405 Tyonek G-4 OPEN 8440 9120 Tyonek G-5 Below CMT Retainer WBD Ba-04.docx Page 1 of 1 ARD 2/2010 dline= i 20" 1003 3-3/8" 1987' 5263' DTIS BWH Packer Offshore Baker Platform Ba -04 N Middle Ground Shoal RKB: MSL = 101' KB: MSL Water Depth= 102' an Sea Level Mud Line Ilii BHT = 125 @ 7800' 7" 9168' Pore Press = 3100 1 7800 MD (7.6 ppg E PBTD =8437' TD = 9215' MAX HOLE ANGLE = 6° @ 7918'MD/7910'T ADL: 17595 PTD: 164-006 Leg 5, Slot 1 Proposed Schematic Size Type Wt/ Grade/ Conn ID Top Btm Cement CMT Sacks To 36" Structural ......._. 400??......... .................................................'............. ...................... ...... 20" ......... ......... . _.................................................................................................................. 94 / H-40 I....... surf 1003 1500 . ..... .. ...... 13-3/8" _Conductor ..........._...._._.._.........................................................................................................................._................-..............................................................................................................._............................. Surface 54.5 & 61 / J-55 surf 1987 25 ...... 9-5/8" __ Intermediate ................................._..............._.._.................._....................................................................................................................._.................................................................................. 36, 40, 43.5 / J-55 & N-80 surf 7151 765 .......... _..1400....................6935;,..... ? .....7...... ..... _.....Prod...Liner.......................23....26..N-80....S-95........... ............................ ..... ..... ............................._............. ...........6935..........._........92.1.5.......... _._............._............... ........................................ ....... _.............................. ........ _..................... ..... .................................-_...... .............................................................. ............................................................_................................. 23 / N-80 3510 6934 7" Tie-back .................................................................... .....1322.....................351.0........... 525 3790 ................................................... ..._................................................................... .........................I...26..�..N-80........._ _. 29 / S-95 149 _. 1322 ................................................................................................................. Completion 3-1/2 Prod Tubing 9.2#, N80 BTC 32.0 7560 Completion Jewelry Detail # Depth Length ID OD Item 149 7" Tieback casing hung at 150' in Underwater wellhead. 1 5232 1.37 2.813 3.96 OTIS "X" Nipple 2 5263 4.52 4.0 5.875 OTIS "BWH" Packer -3 7482 4.10 2.813 4.450 OTIS "XA" Sleeve (opens up) 4 7525 4.0 4.0 5.875 OTIS "BWH" Packer 5 7547 1.37 2.813 3.96 OTIS "X" Landing Nipple 6 7557 0.65 2.990 5.5 Re -Entry Guide 8445 Damaged Casing assumed to be collapse 2/93 *Pulled Tbg in 1984 & found hole in collar which was causing communication to Tbg annulus. * Last Tag @ 7823' w/SBHP Survey on 9/3/07. 2.02" GR ran to 7855' on 7/27/05. * Passed MIT to 2000 psi on 3.5" X 7" for 30 min on 3/1/93. * Relief valve installed on 9-5/8" duft active injection. Set at 1500psi. Still installed?? * Could no pump into 9-5/8" to freeze protect on 9/9/05. * Drilled off "the old minimum self-containedplatform". FISH Below Retainer — Wireline Tools @ 8442' Perforation Data Top Bottom Pool Info 5310 7275 Tyonek A, B, C, E, Cement Squeezed F Pools 7375 7765 Tyonek G-1, 2, 3 Cement Squeezed 7785 8405 Tyonek G-4 Plugged 8440 9120 Tyonek G-5 Below CMT Retainer ND :i @ AN) /D WBD Ba -04 proposed REV 1 docx Page 1 of 1 ARD 2/2010 ) ) Chevron III Timothy C Brandenburg Drilling Manager Union Oil Company of California P.O. Box 196427 Anchorage, AK 99519-6247 Tel 907 263 7657 Fax 907 263 7884 Email brandenburgt@chevron.com Commissioner John Norman Alaska Oil & Gas Conservation Commission 333 W. th Avenue Anchorage, Alaska 99501 <, Uli-~O' \~ 6\\ Ç1 2DD~:, ," s<;ANNE\)1 {~~\. ~ ~JI (i) .. '/ Ii,';:;;:,: October 10, 2005 \bl.\'-Ð00 Q;~",ot Re: Baker Platform Pilot Pre-Abandonment Work Summary Dear Commissioner Norman, Tills letter is intended to update the Alaska Oil and Gas Conservation Commission on the status of Unocal's pilot pre-abandonment work on the Baker Platform in Cook Inlet, Alaska. On October 22, 2004, Unocal proposed that a pilot program be initiated on the Baker platform to develop a safe, cost effective, and optimal method for the abandonment of multiple well bores. As noted in the letter of October 22, 2004, Unocal has operated the Baker and Dillon Platforms under a "lighthouse" mode where all oil and gas production has been shut-in. The Dillon Platform was shut-in December 2002 and the Baker Platform was shut-in August 2003. Unocal commenced the pilot study with a diagnostic program on five water injection wells and three oil wells on the Baker Platform in July 2005. The diagnostic program consisted of pressure and temperature surveys for baseline data, mechanical integrity of the completion, injectivity tests to the formation, and pressure measurement on the outer casing annuli. The inj ection wells initially surveyed were Baker 7, 8rd, 12, 15rd, and 27. The oil wells surveyed were Baker 13, 28, and 30. Unocal did not anticipate that any of the oil wells on the Baker platform would have a bottom hole pressure (BlIP) gradient exceeding seawater. However, when it was discovered that Baker well 28 had a static BlIP of9.0 ppg, the diagnostic program was expanded to include all of the oil wells and water injection wells on the Baker Platform as well as six wells on the Dillon Platform. The Baker water injection wells have mostly held their residual pressure since being shut-in. Their BlIP gradients range from 5.8 to 9.4 ppg. Three oil wells on the Baker platform have BlIP gradients that exceed a seawater gradient. Two additional wells have pressures that exceed an oil gradient but are below a seawater gradient. Under the right conditions, these wells could be capable of unassisted flow. The Baker Platform Well BlIP Summary is attached. The Dillon well BHPs are all below a seawater gradient of 8.4 ppg. No additional diagnostic well work on the Dillon platform has been initiated. ~1Jn~ ,'r ^TE ,), ~ 1-' ~_ à ~'<...~ f-\ t Union Oil Company of California / A Chevron Company http://www.chevron.com ) ") Commissioner John Norman Alaska Oil & Gas Conservation Commission October 10, 2005 Page 2 No temperature anomalies were noted on the Baker platform with the exception of Baker well 28. Baker 28 exhibited a temperature anomaly at approximately 5,000 feet MD, as noted on the attached Baker Composite Temperature Chart. An assessment of Baker 28 is attached with the recommendation of no remedial activity. Chevron intends to conduct annual temperature/pressure surveys on Baker 28 to monitor the well status. There were no temperature anomalies noted on the Dillon platform wells. The pilot abandonment program commenced with plugging perforations on the water injection wells initially identified (i.e. Baker wells 7, 8rd, 12, 15rd, and 27). The plugging of the perforations received Sundry approval and the integrity testing of the cement plugs was witnessed by an AOGCC representative. In addition, perforations were plugged in the water supply well Baker SOland in the gas well Baker 32. In light of the Chevron Corporation acquisition ofUnocal, the well plugging operations for the oil wells on the Baker platform has been omitted from the 2005 pilot program to allow time to reassess economic potential under Chevron's criteria. Furthermore, the gas potential from the Baker is also being re-assessed. To better prepare for the winter, Chevron will be applying heat on both the Baker and Dillon platforms. In addition, the wells capable of receiving a freeze protect fluid in their respective annuli will be freeze protected. If you have any questions or concerns, please contact me at 907-263-7657. S incerel y, ~&é-¿~7 Timothy C. Brandenburg Drilling Manager Attachments Cc: Dale Haines Gary Eller Union Oil Company of California / A Chevron Company http://www.chevron.com Baker Platform Well BHP Summary Last Updated: October 7,2005 Pressure Su rvey Measured Gradient Equivalent Mud Well Well Type Date MD (ft) TVD (ft) BHP (psia) (psi/ft) Weight (ppg) Notes ~ Ba-4 Injector 27-Jul-05 7850 7843 3141 0.400 7.7 Ba-5 Producer 30-Jul-05 6284 5566 2753 0.495 9.5 Ba-6 Producer 20-Jul-05 5712 5709 2811 0.492 9.5 Ba-7 Injector 7-Jul-05 6244 5630 2712 0.482 9.3 Ba-8rd Injector 7-Jul-05 7100 6937 3288 0.474 9.1 Ba-9rd2 Injector Perfs cemented, no survey planned Ba -11 Producer 21-Jul-05 8379 8113 3273 0.403 7.8 Ba-12s Injector 6-Jul-05 7080 6066 Ba-121 Injector 16-Jul-05 7121 6106 2941 0.482 9.3 Ba-13 Producer 6-Jul-05 7916 7661 3236 0.422 8.1 Ba-14 Gas No survey Ba-15rd Injector 5-Jul-05 6480 6286 3050 0.485 9.3 Ba-16 Injector No survey Ba-17 Injector No survey Ba-18 Gas No survey Ba-20 Producer 28-Jul-05 4134 4030 1242 0.308 5.9 Obstruction in tubing at 4139' Ba-23 Injector 23-Jul-05 8841 8499 2584 0.304 5.8 Ba-25rd Producer 22-Jul-05 9495 9033 3208 0.355 6.8 Ba-27 Injector 6-Jul-05 7779 5999 2928 0.488 9.4 Ba-28 Producer 3-Jul-05 8441 5308 2497 0.470 9.0 Ba-29 Producer 28-Jul-05 7923 7594 2165 0.285 5.5 Ba-30 Producer 4-Jul-05 10966 9109 3593 0.394 7.6 ~...' Ba-31 Producer 29-Jul-05 11433 10636 3795 0.357 6.9 Ba-32 Producer No survey ) ~ ,'? ~7J1~! :} [Æ~[Æ~~~[Æ ) AT¡ASIiA OIL AlVD GAS CONSERVATION COMMISSION FRANK H. MURKOWSKI, GOVERNOR 333 W. 7fH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279~ 1433 FAX (907) 276-7542 Mr. Dave Cole Oil Team Manager UNOCAL P.O. Box 196247 Anchorage, AK 99516-6247 öCo [ htfA:> Re: Middle Ground Shoal Unit Platforms Dillon and Baker Dear Mr. Cole: This letter confinns your conversation with Commission Engineer Tom Maunder last week regarding the multiple Applications for Sundry Approval (Form 403) you submitted in mid October regarding changing the monitoring frequency on the 16 wells on Dillon Platform and 23 wells on Baker Platform. Production and injection operations were halted on these platforms in 4th Q 2002 and 2nd Q 2003 respectively. Attached, please fmd the Sundry Applications, which are being returned without approval.., because the relief you request needs to be sought through a different procedure. The intent of submitting sundry notices for each well was to establish a monthly pressure and general monitoring frequency for all wells on Dillon and Baker. There is arequirement in place for some of the water injection wells that pressures and rates are to be monitored daily and reported monthly. Since the platforms are unmanned and not operating, it is not possible to obtain daily information. When operations were curtailed, a monthly monitoring frequency was established in the Plans of Development (POD) annually filed with the Division of Oil and Gas and Unocal desires to assure that this monitoring scheme is accepted by the Commission. As noted in the conversation, changing the monitoring frequency where presently in place and establishing a monthly monitoring frequency in general is not an action that is best accomplished with multiple sundry notices. A letter application requesting the desired monitoring schedule should be made under the applicable Area Injection Orders (AlO 7 for Baker and AIO 8 for Dillon) and Conservation Oiders (CO 44 and CO 54) for the platforms/unit. The Commission looks forward to receiving your letter applications. If prior monthly monitoring information has not been submitted to the Commission, that information should be ubmitted forthwith. . No an Daniel T. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this _day of November, 2004 SCANNED NOV Z 11 2004 Ene!. , .: ) STATE OF ALASKA-' ALASKA OIL AND GAS CONSERVATION COMMlb;:>(ON APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 Operational shutdown U Plug Perforations D Perforate New Pool D 4. Current Well Class: RE OCT 1'~, 2004 Perforate U A'askrO~~a~ 6008~uUl_~ ¡\ Stimulate D Time Extension [Ahchorage Other 0 Re-enter Suspended Well D Monitor Frequency 5. Permit to Drill Number: ~ ::1 Name and Number: / 10. Field/Pools(s): / MIDDLE GROUND SHOAL ,,' // ,/ / " PRESENT WELL CONDITION SUMMARY / Effective Depth MD (ft): Effective Depth TVD (ft): '~" PI's (measured): 8,740' 8,729' / MD /D Burst 1,003' /, / // 1,003' 1,987' , ' 1,986' 7,1~~: / 9,2; Tubing Size: Abandon U Alter casing D Change approved program D 2. Operator Name: Union Oil of California aka Unocal 1. Type of Request: Suspend U Repair well D Pull Tubing D Development Stratigraphic 0 D Exploratory D 1640060 Service D 6. API Number: 3. Address: 909 West 9th Ave. Anchorage AK 99501 50-733-10070-00 7. KB Elevation (ft): 75' 8. Property Designation: BAKER 11. Total Depth MD (ft): Total Depth TVD (ft): 9,215' Casing Structural Conductor 9,202' Length Size 20" Surface Intermediate 133/8" 95/8" 7,148' 9,202' 9,690 psi Production Liner 7" Perforation Depth MD (ft): 7580 to 8405; Packers and SSSV Type: Perforation Depth TVD (ft): 7574 to 8395; Tubing Grade: 31/2" Packers and SSSV MD (ft): 9.2# N-80 12. Attachments: Description Summary of Proposal ~ Detailed Operations Program D BOP Sketch D 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: Exploratory D Development 15. Well Status after proposed work: Oil 0 GasD WAG D GINJ D 0 16. Verbal Approval: Commission Representative: Date: Plugged WINJ 17. I hereby certify that the foregoing is true and correc to the best of my knowledge. Contact Printed Nam¡) ,', J"9,.'"\ D yc~ Title Oil Team Supervisor Signature ~t{'æL 907-263-7805 Date COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity D BOP Test D D D Mechanical Integrity Test Location Clearance Other: RBDMS BFL NOV 22 2DD4 EIVED Junk (measured): 8,442' Collapse 7,830 psi Tubing MD (ft): 7,558' Service D D D D D Abandoned WDSPL 27-Sep-2004 .3P'I-VL(D APPLICATION RETURNED 11/17/04 NOT APPROVED BY COMMISSION Subsequent Form Required: Approved by: COMMISSIONER BY ORDER OF THE COMMISSION Date: ~3 Form 10-462t'Revised 12/2003 ~\G\NAL Submit in Duplicate • STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon Li Suspend Lj Operation Shutdown Lj Perforate I WaiverLi Other d Performed: Alter Casing ❑ Repair Well ❑ Plug Perforations ❑ Stimulate❑ Time Extension F] Change Approved Program ❑ Pull Tubing F] Perforate New Pool ❑ Re-enter Suspended Well El Shut in & secure 2. Operator Union Oil of California 4. Current Well Class: 5. Permit to Drill Number: Name: aka Unocal Development ❑✓ Exploratory❑ Stratigraphic❑ Service F] 1640060 3. Address: 909 West 9th Ave. 6. API Number: Anchorage AK 99501 50-733-10070-00 " 00 7. KB Elevation (ft): 9. Well Name and Number: 75' Ba -04 8. Property Designation: c^ 41 10. Field/Pool(s): BAKER PT t MIDDLE GROUND SHOAL 11. Present Well Condition Summary: Total Depth measured 9,215' feet Plugs (measured)e true vertical 9,202' feet Junk (measured) 8,442"'. Effective Depth measured 8,740' feet true vertical 8,729' feet., Casing Length Size MD TVD Burst Collapse Structural Conductor 20" 1,003' 1,003' Surface 13 3/8" 1,987' 1,986' Intermediate 9 5/8" 7,153' 7,148' Production 7" 9,215' 9,202' 9,690 psi 7,830 psi Liner Perforation depth: Measured depth: 7580 to 7765; 7820 to 8035; 8070 to 8145; 8170 to 8180; 8205 to 8260; 8370 to 8405; True Vertical depth: 7574 to 7758; 7813 to 8027; 8061 to 8136; 8161 to 8171; 8196 to 8251; 8360 to 8395; Tubing: (size, grade, and measured depth) 3 1/2" 9.2# N -80@7,558 - Packers and SSSV (type and measured depth) Otis "BWH" Packer @5263' and 7,525' 12. Stimulation or cement squeeze summary: Intervals treated (measured): SaNNE'D Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 675 1900 3000 Subsequent to operation: 0 0 on 02/24/04 0 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory E] Development El Service ❑ Daily Report of Well Operations 16. Well Status after proposed work: IS- Oil Gas ❑ WAG ❑ GINJ ❑ WINJ ❑ WDSPL ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Printed Name P. M. Ayer Title Petroleum Engineer Signature Phone 263-7620 Date 07 Jun 2004 Form 10-404 Revised 12/2003 "'TrJUMS MAY 2 9 2012 =* 13-3/8" 54.5# & 61 # 1987' f 7" 23,26, & 29# F/0-6935' 9-5/8" 40 & 43.5 0 7151' 7" 23 & 26# 0 9215' TUBING DETAIL 3-1/2", 9.2#, N-80 BTC 1) Otis "X" Nipple 05232' 2) Otis "BWH" Packer 0 5263' 3) Otis "XA Sleeve 7482' 4) Otis "8WH" Packer 0 7525' 5) "X" Nipple 0 7547' 6) Re—Entry Guide 0 7558' Perforations: Detailed Attached 5310'-6186' 0 Intervals (Sgz'd) 6775'-6825' 0 Intervals (Sgz'd) 7080'-7275' 0 Intervals (Open) 7375'-7520' 0 Intervals (Sgz'd) 7580' 7765' 7820' 8035' 8070' 8145' Intervals (Open) 8170' 8180' 8205' 8260' 8370' 8405' Cement Retainer 08740' ETD TOF at 8442' (Log Tool) Damaged Casing at 8445' ADL 17595 WELL NO. 4 DRAWN: CLL COMPLETION SCHEMATIC SCALE: NONE UNION OIL COMPANY OF CALIFORNIA (dba UNOCAL) DATE: 3-1-93 BAKER PLATFORM API # 50-733-20070-00 MGS. ST. 17595 # 4 WELL HISTORY LAST WORK: 3/1/93 Well Baker #4 DATE COMPLETED EVENT 8/24/64 Spud 10/13/64 Completed as a shut-in oil well. 4/30/74 Converted to a water injection well. 4/19/84 WO - Ran single 3 1/2" tbg to 7,834'w/ Baker FB -1 Pkrs @ 7,029'& 7,554'. 2/8/93 Ba -4 is In Communication with Ba -23 & Ba -25. Recently obtained pressure data from Ba -25 (2,000 psi @ 8500' SS & Bubble Pt. Pr. of 1,410 psi indicates pressure support is not adequate). 2/18-28/93 WO - Discovered collapsed casing below 8,445'. Set cement retainer @ 8,440' and perforated from 7,580' to 8,405'. 2/28/93 PF - Perforate Tyonek "G" WNann TCP Guns, 4HPF. G-3 7,580'- 7,765' 185' G-4 7,785' - 7,800' 15' G-4 7,820' - 8,035' 215' G-4 8,070'- 8,145' 75' G-4 8,170'- 8,180' 10' G-4 8,205' - 8,260' 55' G-4 8,370' - 8,405' 35' TOTAL 590' 3/1/93 WO - Ran single 3 1/2", 9.2#, N-80 tbg. to7,560' W/Otis BWH Pkrs. @ 5,263' & 7,525'. 06/30/03 All casing and tubing valves closed; pipe connections removed and blind flanges installed. Gauges installed to monitor pressures. i 1 U GRANITE POINT ADL 17595 WELL NO. 4 Pertinent Data: Spud Date: December 28, 1966 Surface Location: Fifth Leg cantilever and caisson, NE of Leg 2 1971' FNL, 610' FW L Subsurface Location: 1916' FNL, 932' FWL, Sec. 31 T9N, R12W, S.M. Elevation: RDB 75' -MSL TD: 9215' Plug Back Depth: 9142' Casing: 20", 94# at 1003' w/1500 sx 13-3/8" 54.5 & 61 # at 1987' w/2500 sx 9-5/8" 36. 40 & 43.5 7151'w/765 sx 7" 23 &26# at 6935-9215' w/1400 sx 7" 23, 26 & 29# at 0-6935'w/525 sx Initial Potential: EFG 1180 BOPD at 150# FTP, GOR 392 Initial Stimulation: Diesel and diesel x 10% Control Flow Squeeze on intervals given by * below, after perf in water or water base mud. All other zones perf in diesel x flow natural. GRANITE POINT ADL 17595 WELL NO. 4 (continued) Perforation Record: • Date Zone Interval 9-64 EFG* 8400-60' Flw 298 BOPD @ 145# w/3745 BHSIP. 9-64 EFG* 8805-65' Flw 287 BOPD GOR 376 @ 90# / 4095 BHSIP. 9-64 EFG 7080-7130'. Flw 807 BOPD @ 190# w/3735 BHSIP. 10-64 EFG 7670-7730' Flw 773 BOPD GOR 190 @ 127# w/3785 BHSIP. 10-64 EFG 8070-8130' Flw 511 BOPD GOR 267 @ 104# w/3870 BHSIP. 10-64 A 5570-5620'. Flw 204 BOPD x 1180 MCFD @ 1800# w/2683 BHSIP and squeeze cement. 10-64 BCD 5920-70'. Flw 867 BOPD GOR 91 @ 184# w/2687 BHSIP- squeeze cement 11/66. 10-64 BCD 6136-86' Flw 635 BOPD GOR 113 @ 185# w/2778 BHSIP- squeeze cement 11/66. 12-66 EFG 6775-85'6810-25', 7080-7130', 7245-60', 7375-7460', 7480-7520', 7580-7765', 7785-7800', 7820-8035', 8070-8145', 8210-55', 8370-8500', 8610-8770', 8800-8920', 8985-95', 9010-30', 9050-9120'. 1-68 A 5310-20', 5450-70', 5530-45', 5580-5610', 5650-60'. 4-74 EFG 7240-60', 7265-75', 7375-7460', 7475-7520', 7580-7670', 7840-8035', 8170-80', 8205-60', 8865-8940', 8985-95', 9010-30', 9050-9120', @ 2 JSPF w/casing gun. 10-80 G 7498-7520'2 SPF, 7590-7760'2 SPF, 7785-7800' 4 SPF with Dresser 4" casing gun. Reservoir Data: Zone Depths: GRANITE POINT ADL 17595 WELL NO. 4 (Continued) A zone: 5300-5720' BCD zone: 5720-6767' EFG zone: 6767-9120' Cored Intervals: A zone: 5312s, 5441s, 5446-1/2s, 5585s BCD zones: 5860s, 5940s, 6162s, 6165s, 6270s, 6424s, 6518s, 6528s EFG zones: 7366-97', 7399-7410', 7458-82', 7522-47', 7597-47', 7597-7610', 7715-42', 8024-36', 8181-96', 8600-15', 7076s, 7088s, 7101s (S indicates possible percussion sidewall core) DST Intervals and Results: A zone: None (in pipe DST's listed above) BCD zone: None EFG zone: 7151-7456' FLW 9 hrs @ 141-1050 BOPD w/0-575 psi FTP, FSIP 3433 Final FLW 630 BOPH x GOR 685 @ 575 psi Selective Tests: A zone: Re above workover 1/68 and 1/70 BCD zone: None EFG zone: Re above IPF and workover 1/70 Log Inventory: ~!:,.~~ONOr. ALe Monthly Injection W.A'I'ER~LOOD INJECTOR M'ONEn-IL¥ REPORT BAKE~ PLA'['FOI~vl: ~A 4: $0'~33100?000S01 Hfl Volume Tbg Well Date On Inje,?ted Press l~reu Pre~s ... B~ 4 6/l/Or 12 41~ 1950 1975 0 i iiiii illl _. i i _ii i BA 4 6/2/01 -24 817 3000 1925 0 s iai il I . ,~ II BA 4 6/3t01 24- 792 3000 192:5 0 ........ ia il . .II ~ . i ii il i BA 4 6/4/01 24 787 3000 1925 0 -- ..._ la .... i BA 4 615/01 24 784 3000 1925 0 SA4 o/&Ol :~4 .....,s2 ' ~ooo ~9'2~' o Sl III, III . I Ill .... II BA 4 6/?/01 24 783 3000 1950 0 I m I ill ] fall /llll / . Ba 4 6/8/01 2~ 781 3050 1950 0 .... : Sill I i III BA 4 6/9/01" 24 7~3 -3050 _1950 0 ...... Il I I I · Il BA 4 6/10/01 24 769 3050 1975 0 i iii ! · ii ila i i BA 4 ~/1i/01 6 199 1400: 2250 0 I-- i ~, iiII I i · i ii la^ 4 6/12/01 0 0 1200 2350 0 · - .. ·1 ~ .,.. ~ .. ,', , . . ,, .... . ,~, BA4 i 1 6/13/01 0 0 ' ~ 10~10 ~ 2400 : 0 iBA 4 6/14/01 0 0 1050 2425 0 I~A 4 6/15/01 0 0 1000 2450 0 ~m .... lin BA4 [ 6/16/01 O' '- 0 925 2475 0 BA4 6/17t01 0 0 950 2500 0 ill ' ' Ill I 'l I _ I : i ~ ' · ~I s I BA 4 6/18/01 0 0 900 2500 0 .... nil i ii . ii i BA 4 6/19/01 0 0 850 1400 0 BA 4 6/20/01 0 0 850 1400 0 ...~IL ~. I Il i i ik I Il BA 4 6/21/01 0 0 800 ~ 400 0 · i il iii ~^ 4 6t:2(o~. , o .t o aoo' ~4oo o -. .~., n ,, BA 4 6/23/01 0 0 800 ! 400 0 BA 4 6124/01 0 0 750 1400 0 ql i i i il f _.[ii i BA 4 6/25/01 0 0 700 1450 0 Ill I I .... · Il -- ~4 ~r~/Ol o- o, ~oo 1,~5o o I · .~.a i I Il I l '~-~ 4 6/27/01 0 0 700 1450 0 Il I Il · ,Ill ·7 · .... BA 4 6/28/01 0 0 700 1450 0 III Il I i I Il I~A 4 6/29/01 0 ' 0 " 700 1450 0 ~, . ] ~1 I ...... IIII Ill Il 11 I BA 4 6/30/01 : l 0 0 '700 - 1450 0 , RECEIVED JUL 0 5 ?.001 Alaska 0il & Bas G0ns Monthly Injection hort ,¥A".YERFLOOD INJECTOR M. ONTHLY REPORT ~AKER PLATFORM: BA 4: fi0733 I007000S01 Hfs Volume Tbg 7 C~ 9.62~S Well Date On Injured Press Press Pre~s i~'A 4 :~/1/01 20 650 2950 1750 .............. 0- , ....................... i '--- iii BA 4 5~I01 24 776 ~000 1750 0 BA 4 5/3/01 24 772 3000 1750 0 I)A 4 5t4t01 24 772 3000 17~0 0 BA 4 ~/5/01 24 773 3000 1750 0 BA4 5J~lO1 24 771 3000 1750 0 ...... hA 4 ................. 5h20~ ..... 24 772 3000 I750 0 ~n 4 s~/o~ 24 771 ~6o~ .......... ~7~o o ~ L i i BA 4 5~/01 24 771 3000 17s0 0 BA 4 5/10/01 24 765 ~000 1750 0 BA 4 5/tl/Ol 24 764 5000 : 1750 0 BA 4 5/12/01 24 773 1000 1775 0 B~4 5/13/01 24 771 3000 i775 0 I BA 4 5/14/01 24 [~ 772 ~000 , 1775 0 BA 4 5/15/0I 10 t22 ~" 2200 2250 0 a i BA 4 5/16~1 0 0 1700 21 ~0 0 BA 4 ~/t7/0l 0 0 1700 2~00 0 i i ill i Il ........ I J .............. J ............. BX4 5/18/01 ~.~ I~0 1700 19S0 0 'BA4 S/ig~i .......... 24 853 1700 1860 ~ 4 ., ~/g0/01 24 816 lg00 1850 0 .., fl s ~ - lin BA 4 5~ 1/01 ~ 803 2050 1850 0 **., ,,. · , ~ ,,, .. , ~- BA 4 5/22/01 24 794 2200 1850 0 Illll I I1A 4 fi/2~/O 1 ~ 784 2300 1850 0 i ii ii ii i ilill i BA4 5~4/01 ~ 782 23S0 .... 1~5o 0 / I It II " BA 4 ~q5/01 24 779 2S00 1850 0 I i,- ~' '~l al .... BA 4 5~6/01 24 778 2500 1850 0 Illl . lq I I BA 4 ~7/01 24 780 2600 1900 0 BA 4 5/2~? 24 779 ~,~,~0 1900 ...... 0 ,- BA 4 5~9/01 24 774 3000 ! 900 0 1t~ 4 5/~0/01 24 769 3000 1900 0 ItA 4 5/31/01 24 770 3000 1900 0 RECEIVED JUN 0 5 kll l Oil & Gas ns. C, om r lm Anchorage ,-Re: FW: Baker 4 Injection well. Subject: Re: FW: Baker 4 Injection well. Date: Wed, 29 Mar 2000 12:46:11 -0900 From: Blair Wondzell <blair_wondzell@admin.state.ak.us> Organization: State of Alaska, Dept of Admin, Oil 8: Gas To: "Ruff, Christopher A" <mffc~unocal.com> Chris, This looks reasonable. Blair "Ruff, Christopher A" wrote: Blair, I'm not sure when we will have the new pressure relief valve installed, but we will return B-4 to injection once it is installed. I modified our plan to set the casing pressure at 1500 psi, but still to shut the well in if the pressure exceeds 2000 psi (as you can see in the attached email). After reviewing the recent injection history, it appears that the problems started when we reduced the casing pressure from 1500 psi around Feb 8th to 500 psi. Since we had no problems when the casing pressure was near 1500 psi I thought it would be better to set the well up as it was before the problems began. Let me know if you have a problem with this, as I said we won't be bringing the well on for at least a few days. Chris Recent Well History attached... <<b4. xls>> > .... Original Message ..... > From: Ruff, Christopher A > Sent: Tuesday, March 28, 2000 5:47 PM > To: Brandon, Stewart; Lott, Michael J > Cc: Meyer, Steven K; Myers, Chris S; Dolan, Jeff J; Tyler, Steve L. > -Contract > Subject: Baker 4 Injection well. > Blair Wondzell has approved the MIT on B-4 but is confused by the high > casing pressure. > Once we have the new pressure relief valve installed, please bring Baker 4 > back online according to the procedure below... > Initial Injection Procedure for Ba-4 > I. Adjust Tubing x 7" Casing Annulus > Bleed off the annulus pressure to 1500 psi. > II. Ba-4 Injection Start-up > Gradually pinch back the lower priority wells while incrementally > opening B-4 to injection until the well is injecting at the system > pressure, probably around 3400 psi. > Do not exceed maximum pressure guideline of 3400 psi > III. Tubing x 7" Casing monitoring > Monitor closely for the next two weeks. If the casing pressure > exceeds 2000 psi at any time, shut-in the well and notify Chris Ruff ~ > 263-7830. 1 of 2 3/29/00 12:47 PM -,-Re: FV~ Baker 4 Injection well. Name: b4.xls Type: En coding: b4.xls Microsoft base64 Excel Worksheet (appli ca t ion/vnd, ms-excel) 2 of 2 3/29/00 12:47 PM ~iAR-2?-§8 FRI 13:62 UNOCAL ASSET GAS GRP FAX NO. 90'F2~'F4 F, UI/UI Unocal Corporation 909 West 9'~ Avenue, P.O. Box 196247 Anchorage, Alaska 99519-6247 UNOCAL ) March 27, 1998 Wendy Mchan Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Re: Status of Unocal's Cook Inlet. Injector Work Dear Wendy, This letter is to provide you with an update of the work conducted since our January 23, 1998 letter which Blair signed granting time extensions for various wells. Tearing or xvork was completed on the following wells and the results of this work is listed: Anna 29-42: Well head inspection completed (no leaks), Variance granted on 3/3/98. - Baker 4: MIT passed on 2/15/98 by Leu Grimaldi Bruce 31-42: Coil Tubing operation completed to repa/r leaking cement plug. Pressure test completed. GP 33-14RD: SI MIT successfully completed on 2/11/98. GP 22-13RD2: Variance granted on 3/17/98, MIT completed on 12/15/97. Grayling 16: Workover completed on 3/26/98. MIT Passed. Monopod A-SRD2: MIT passed on 1/28/98 by Leu Grimaldi Testing or work was attempted on thc following shut-in w~lls aad a time extension tmtfl June 30, 1998 is re0uested to complete furth~ work and testing. Anna 19-42: Scale cleanout of tubing completed, fmther testing s, heduled to prove casing integrity, Anna 2%42: Scale cleanout of tubing completed, further testing schedul~l to prove ca~ing integrity. Anna 46-42: Temp Survey ran on 2/17/98, survey should prove no flow and allow SI status. Baker 9: MIT attempted on 2/15/98, further wireline testing scheduled to prove casing integrity. Monopod A-12RD2: SI MIT a~empted, Temp Survey scheduled to prove no flow. Monopod A-29 : SI MIT scheduled to prove no flow/casing integrity King 4RD : WFL indic~es possible casing leak, w~ll shutin, further testing and workovcr scheduled. King ISRD: WFL indicates possible casing leak, well ~utin, further testing scheduled. King 22RD: WFL indicates possible casing leak, well ahutin, further testing ~eheduled. Grayling 5 : Workover/Redrill scheduled in torrent drilling schedule. Grayling 22 : Workover/Reddll scheduled in current drilling schedule. Grayling 28 : Workovcr/Redrill scheduled in currant drilling schedule. Grayling 36DPN : Workover/Redfill scheduled in currant drilling schedule. Grayling 40 : Workover/Redrill scheduled in current drilling schedule. Unocal respectfully requests a time-extension until June 30, 1998 to complete the work on the above listed Anna, Baker and Monopod wells. The Grayling and King work will be executed per our current drilling sched_ul.~.J~lCilSC P. EC call me if you have any questions or claritkation on these issues. F I ~ ~ 9 Senior Reservoir Engineer Cook Inlet Watertlood Mana~lf$~ Oii & Gas Gons...Lomrnlsslon hnct~orage Please acknowledge tho approval of the time extension and >'our receipt of this letter by faxing back a signed copy of this letter to Christopher Ruff at 263-7874 (fax). ~Vcndy~d~han Dat~ ....I - AOGCC Unocal AlasKa Resources ~nocal CorDorauon ~09 West 9th Avenue. P.©. Box ~ 95247 :,ncnoraae. AlasKa 99519-6247 'TeieDnone ~907~, 27~-7600 UNOCAL January 23, 1998 Blair Wondzell State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Re' Status and Plans for MIT testing of Cook Inlet Injection Wells Dear Blair: Thank you for your assistance in helping us complete our mechanical integrity testing of water injectors in the Cook Inlet Area. The following is a status of our efforts to date. We also request a time extension for a group of wells listed below to allow us to complete testing work. We request a time extension for completing MIT testing on the following wells until the end of March 1998: Currently shut-in wells Granite Point Field Anna 19-42 Anna 27-42 Anna 46-42 ~"~.,.,-~-,;+A n,,.,;,,.,+ nl,-~+~ ..... ~^~-" ........ , ............ ,. ~.~. 33-14RD Middle Ground Shoal Field Baker #9 Currently injecting wells Tradinq Bay Field Monopod Platform A-8RD2 Wells Needing Repair The shut-in MIT on Bruce Platform Well. # 31-42 indicated a problem with the :emporary abandonment which was completed on 10/7/88. We will develop and send to you a procedure for repairing or permanently abandoning this well. An MIT on shut-in Granite Point Platform Well. # 33-14 indicated a mechanical problem with this well. We will develop and send to you a procedure for repairing or permanently abandoning this well. We also want to confirm your receipt and approval of the following shut-in MIT tests. For our records, please sign and return a copy of the following Shut-in MIT tests: Baker #8 Baker #12 Monopod A-5R cz Monopod A-12R2 Monopod A-26 Monopod A-29 ,~, Please indicate your approval of the shut-in tests and the time extension requested by signing and returning a copy of this letter. Thanks again for your help in this matter. Sincerely, etanka Reservoir Engineer Agreed to by: Blair Wond~ell ~// Petroleum Engineer AOGCC ,,---~ STATE OF ALASKA ~ "~ ') ,, ~' ALASKA. ,.. AND GAS CONSERVATION CO ~ISSION ~'.""? ....... ~ REPORT OF SUNDRY WELL OPERATIONS , 1. Operations performed: Operation shutdown __ Stimulate __ Plugging Perforate Pull tubing X Alter casing__ Repair well Pull tubing Other 6. Datum elevation (DF or KB) \ I 2. Name of Operator Union Oil Company of California (UNOCAL) 3. Address P.O. Box 196247, Anchorage, AK 99519-6247 Location of well at surface LEG #5, CONDUCTOR #1 1971' FNL, 610' FWL, SEC 3', T9N, R12W, S.M. At top of productive interval At effective depth At total depth 1892' FNL, 942' FWL, SEC 31, T9N, R12W, S.M. o Type of Well: Development __ Exploratonj __ 75 RKB ABOVE MLLW Stratigraphic 7. Unit or Property name Service X MGS STATE 17595 8. Well number WELL NO. 4 9. Permit number/approval number 64-0006 / 93-012 10. APl number 50-73310070-~o ~ 11. Field/Pool MIDDLE GROUND SHOAL feet 12. Present well condition summary Total depth: measured 9215 feet true vertical 9202 feet Plugs (measured) Effective depth: measured 8440 feet true vertical 8431' feet Junk (measured) CEMENT RET. @ 8440' Casing Length Size Structural Conductor 1003' 20" Surface 1987' 13-3/8" Intermediate 7151' 9-5/8" Production Liner 9215' 7" Perforation depth: measured true vertical SEE A'I-I'ACHED SHEET Cemented Measured depth True vertical depth 1500 SXS 1003' 1003' 2500 SXS 1987' 1987' 765 SXS 7151' 7147' 1925 SXS 9215' 9203' RECEIVED Tubing (size, grade, and measured depth) 3-1/2", 9.2#, N-80 @ 7560' Packers and SSSV (type and measured depth) OTIS "BWH" PKR @ 5263' & 7525' 13. Stimulation or cement squeeze summary Intervals treated (measured) NA APR - § 199 Alaska 0il & Gas Cons, C0mmiss[0[~ Treatment description including volumes used and final pressure 14. Prior to well operation Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure NA Tubing Pressure Subsequent to operation 2000 0 PSI 32O0 PSI 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations X Oil __ Gas Suspended __ 17. I hereby c(~[J~fy t~t the f/31[~go('~l i~ tru~rrect to the best of my knowledge. Signed G. RussellSchmidt Title Regional Drilling Manager Form 10-404 Rev 06/15/88 WATER INJ. Service SUBMIT IN DUPLICATE BAKER PLATFORM BA #4 BAKER PLATFORM BA #4 9142' ETD DAY 3 (02/18/93) 9-5/8" C @ 7151' 7"C @9215' 548 PSI PERFORATED TUBING AT 6957'. CIRC BRINE. KILLED WELL. INSTALL BOPE. CONT MODIFY RIG. BAKER PLATFORM BA #4 9142' ETD DAY 4-6 (02/19-21/93) 9-5/8" C @ 7151' 7"0 @9215' 546 PSI CMPT MODIFICATION F/RIG. INSTALL CHOKE & KILL LINES. TEST BOPE. RU WL & RIH W/2.7" TBG CUTTER. UNABLE TO PASS 337', POOH. RIH W/2.59" GAUGE RING TO 7580', POOH. RIH W/2.59" TBG CUTTER, CUT TBG AT 7518' WLM. RU, UNSEAT TBG HGR & PULL SEAL ASSY F/PACKER AT 7031'. CBU. POOH, LAY DN 3-1/2" TBG. MU PKR MILL ASSY & RIH. MILL ON PKR #1 AT 7035', POOH REC'D PKR, TBG & LWR SEAL ASSY F/PKR #2 AT 7550'. MU PKR MILL ASSY #2 & RIH. BAKER PLATFORM BA #4 9142' ETD DAY 7 (02/22/93) 9-5/8" C @ 7151' 7"C @9215' 546 PSI SET DN AT 7411', UNABLE TO WORK DEEPER. SCRAPER & RIH. WASH & REAM F/7413'-7557'. ASSY #2 & RIH. MILL OVER .PKR AT 7557' DPM. POOh. MU 6" BIT & 7" CSG CBU. POOH. MU PKR MILL RECEIVED APR - 5 199;5 Alaska Oil & Gas Cons. Gomm~sSiOr~ ;Anchorage BAKER PLATFORM BA #4 9142' ETD DAY 8 (02/23/93) 9-5/8" C @ 7151' 7"C @ 9215' 546 PSI MILL ON PKR #2 AT 7557'. POOH, REC'D PKR. MU MILL ASSY & RIH TO 8410'. ATTEMPT TO BREAK CIRC, PIPE PLUGGED. POOH, CLEAN PLUG. RIH TO 8382'. BAKER PLATFORM BA #4 8445' ETD DAY 9 (02/24/93) 9-5/8" C @ 7151' 7"C @9215' 546 PSI C/OUT FILL F/8410'-8445'. MILL ON JUNK AT 8445' W/O SUCCESS. DETERMINED EXISTENCE OF DAMAGED 7" CSG @ 8440' & LOST WIRELINE TOOLS @ 8445'. POOH, MILL WEAR INDICATES WIRELINE TOOL. MU 7" RTTS PKR & RIH TO 5280'. SET PKR & PRESS TEST CSG ABOVE TO 1800 PSI F/30 MIN, OK. POOH. RIH W/5-7/8" BIT & 7" CSG SCRAPER TO 8445', UNABLE TO WORK DEEPER. CBU. POOH. MU 7" BRIDGE PLUG & RIH. BAKER PLATFORM BA #4 8445' ETD DAY 10 (02/25/93) 9-5/8" C @ 7151' 7"C @ 9215' 546 PSI SET BP @ 8437' DPM. CBU. POOH. MU TCP GUNS & ASSY. RIH F/TOP SHOT AT 7580'. MU SERVICE LINES & RU WL. RIH W/GR-CCL, PLACE GUNS ON DEPTH W/TOP SHOT AT 7580' DIE SET PKR AT 7501', RE-CONFIRM DEPTHS W/GR-CCL. POOH, DN WL. RECEIVED APR - 5 Alaska 0il & 6as Co~'~s. Corr~missioi'~ Anchorage BAKER PLATFORM BA #4 8416' ETD DAY 11-13 (02/26-28/93) 9-5/8"0 @ 7151' 7"C @9215' PERF 7580'-8405' DIL AT INTERVALS. OPEN BY-PASS & REV CIRC. REL PKR & CBU. POOH W/PERF ASSY. RIH W/6" BIT & CSG SCRAPER, C/OUT TO 8416'. CBU. POOH. PERFORM BOPE TEST. RU WL, RIH W/JUNK BASKET AND GAUGE RING TO 7600'. POOH. MU 7" PERM PKR W/TBG TAIL ASSY & RIH. SET PKR AT 7525' DIL. POOH. MU PKR SEAL ASSY W/3-1/2" TBG AND 7" PERM PKR ON DP. RIH, CBU AT 7500'. STAB SEALS INTO LWR PKR AT 7525', TEST SAME TO 500 PSI, OK. SET TOP PKR AT 5263', TEST SAME TO 1650 PSI, OK. SHEAR OFF PKR & POOH. LAY DN DP & DC. RU & RIH W/3- 1/2" COMPLETION TBG, HYDROTEST SAME TO 5M. BAKER PLATFORM bA #4 8416' ETD DAY 14 (03/01/93) 9-5/8"0 @ 7151' 7"0 @ 9215' CMPT RIH W/TBG. CBU. STAB SEALS INTO PKR @ 5263' & TEST SAME TO 1650 PSI, OK. SPACE OUT & LAND TBG HGR. PERFORM MIT TO 2000 PSI F/30 MINS, OK. ND & REM BOPE. INSTALL CIW 9" 5M X 3-1/8" 5M TREE, TEST SAME TO 5M. RU INJ LINES. PREP RIG EQUIP FOR DEACTIVATION. RIG RELEASED @ 2400 HRS. R E EIVED APR - § Alaska 0il & Gas Cor~s. Corr, missiol" A. ncllo;'ao~ 15-5/8" 54.5//I & 61# 1987' 7" 25,26, & 29# F/0-6955' 9-5/8" 40 & 43.5# .~ @ 7151' /I I FISH l 7" 23 &: 26# @ 9215' TUBING DETAIL 3-1/2% 9.2#, N-80 BTC 1) Otis "X" Nipple @ 5260' 2) Otis "BWH" Packer @ 5265' 5) Otis "XA" Sleeve @ 7490' 4) Otis "BWH" Packer @ 7525' 5) "X" Nipple @ 7550' 6) Re-Entry Guide @ 7560' E,¢EIVED APR - 5 ¥39;~ Alaska Oil & Gas Cons. Ancl~0rage Perforations: Detailed Attached 5310'-6186' @ Intervals (Sqz'd) 6775'-6825' @ Intervals (Sqz'd) 7080'-7275' @ Intervals (Open) 7575'-7520' @ Intervals (Sqz'd) 7580'-8405' @ Intervals (Open) Cement Retainer @ 8440' ETD TOF at 8442' (Log Tool) Damaged Casing at 8445' ADL 17595 WELL NO. 4 PROPOSED COMPLETION SCHEMATIC UNION OIL COMPANY OF CALIFORNIA (dba UNOCAL) DRAWN: CLL SCALE: NONE DATE: 2- 16-95 MGS 17595 #4 PERFORATION RECORD TYONEK a POOL CEMENT SC UEEZED 5310-5320 5307-5317 TYONEK A POOL CEMENT SC UEEZED 5450-5470 5447-5467 TYONEK A POOL CEMENT SC UEEZED 5530-5545 5527-5542 TYONEK A POOL CEMENT SC UEEZED 5580-5610 5577-5607 TYONEK A POOL CEMENT SC UEEZED 5650- 5660 5647- 5657 TYONEK B POOL CEMENT SC UEEZED 5920-5970 5917-5967 TYONEK C POOL CEMENT SC UEEZED 6136-6186 6133-6183 TYONEK E POOL CEMENT SCUEEZED 6775-6785 6771-6781 TYONEK E POOL CEMENT SC UEEZED 6810-6825 6806-6821 TYONEK F POOL CEMENT SC UEEZED 7080-7130 7076-7126 TYONEK F POOL CEMENT SC UEEZED 7240- 7260 7236- 7256 TYONEK F POOL CEMENT SC UEEZED 7265- 7275 7261 - 7270 TYONEK G-1 POOL CEMENT SC UEEZED 7375-7460 7370-7455 TYONEK G-2 POOL CEMENTSC UEEZED 7475-7520 7470-7515 TYONEK G-3 POOL CEMENT SC UEEZED 7580-7765 7575-7760 TYONEK G-4 POOL OPEN 7785-7800 7779-7794 TYONEK G-4 OPEN 7785- 7800 7779- 7794 TYONEK G-4 OPEN 7820-8035 7814-8029 TYONEK G-4 OPEN 8070-8145 8063-8138 TYONEK G-4 OPEN 8170-8180 8162-8172 TYONEK G-4 OPEN 8205-8260 8197-8252 TYONEK G-4 OPEN 8370-8405 8361-8396 CMT RET SET @ 8440 COLLAPSED CASING 8440-8500 8431-8491 CMT RET SET @ 8440 COLLAPSED CASING 8865-8940 8855-8930 TYONEK G-5 COLLAPSED CASING 8985-8995 8974-8984 TYONEK G-5 COLLAPSED CASING 9010-9030 8999-9019 TYONEK G-5 COLLAPSED CASING 9050-9120 9038-9108 RECEIVED APR - 5 199~ Alaska Oil & 6as Cons. Gomm%sSiO~ Anchorage MEMORANDUM ALASKA OIL AND GAS CONSERVATION COMMISSION STATE OF ALASKA to: David Johnstorn~ CommiSsioner thru: Blair E Wondzell Sr Petr Engineer from: ~'~hn Spaulding Petr Inspector date: file: subject: March 4, 1993 JOHO2261.DOC BOP Test Unocal 61 UNOCAL Baker Platform Well 4 Middle Ground Shoals Field Friday, February 26, 1993: I witnessed the BOP Test on UNOCAL Rig 61 on Baker Platform, Middle Ground Shoal Field. The accumulator system was slow in reaching maximum pressure. Since the rig was doing a work over and was about finished, I allowed them to continue. This rig will be removed from the platform and scrapped when finished with this well. SUMMARY: I Witnessed the successful BOP Test on UNOCAL Rig 61 with no failures; the test lasted 2 1/2 hours. Attachment OPERATION: Drlg: Drlg Contractor: ~,/VoSA/ Rig No. Operator: /J,~/~¢ 4 [ Well Name: A/c). ~ Casing Size: ,~ ..~ Set ~ 7/;5'(' Feet Test: Initial Weekly Other STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Workover: ~'~ DATE: ~- - ~ C -- ~,-~ PTD # ~ z/- ~od/~-ORig Ph.# Rep. ,,'~1 Rep. Location: Sec. Test MISC. INSPECTIONS: Location Gen.: ~'~ Housekeeping: ~ (Gen) Reserve Pit~ BOP STACK: Qua. Ann. Preventer Pipe Rams Blind Rams 1 Chk/Ln Valves HCR Valves Kill Line Valves Check Valve Well Sign Drl. Rig Test Pressure jSb I P/F MUD SYSTEM: Light Alarm Trip Tank Pit Level Indicators ,,.~' V/ Flow Indicator Gas Detectors ~- FLOOR SAFETY VALVES: Quan. Pressure P/F Upper Kelly I I Lower Kelly j Ball Type / ~ ~/5o~,o ~ Inside BOP I 13,d31 ~o~, ~ CHOKE MANIFOLD: No. Valves /~' I P No. Flanges Manual Chokes /' Hydraulic Chokes ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master:- Nitgn. Btl's: ~, ~. J minutes minutes ~ Remote: Psig. Number of Failures ~ Test Time ~ ~/;:z_., Hours Number of valves tested _~ Repair or Replacement of Failed Equipment shall be made within days. Notify the inspector on duty and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 If your call is not returned by the inspector within 12 hours please contact the P. !. Supen/isor at 279-1433 Distribution: odg-Well File c - Oper./Rig c - Database c - Tdp Rpt File c - Inspector :STATE WITNESS REQUIRED? YES ~ NO 24 HOUR NOTICE GIVEN YES ~-"'"~ NO ~ Waived By: F~ r. , VVitnessed By: ~/~ ..~a'~"-/!~.c/L~' FI-021L.XLT Rev. 1/93 STATE OF ALASKA ALASK( .L AND GAS CONSERVATION C£ 'llSSION APPLICATION FOR SUNDRY APPROVALS 1. Type of request: Abandon __ Suspend __ Alter casing__ Repair well __ Change approved program __ Operations shutdown __ Re-enter suspended well__ Plugging __ Time extension __ Stimulate __ - e Pull tubing __ Variance __ Perforate X_ Other__ 5. Type of Well: 6. Datum elevation DevelOpment X Exploratonj --- 101' RKB above MLW 2. Name of Operator Union Oil Company of California (UNOCAL) 3. Address P.O. Box 196247, Anchorage, AK 99519-6247 , Stratigraphic __ Location of well at surface Leg #5, Conductor #1 1971' FNL, 610' FWL, Sec 31, T9N, R12W, S.M. At top of productive interval 1870' FNL, 727' FWL, Sec 31, T9N, R12W, S.M. At effective depth 1889' FNL, 937' FWL, Sec 31, T9N, R12W, S.M. At total depth 1892' FNL, 942' FWL, Sec 31, T9N, R12W, S.M. Service 7. Unit or Property name MG$ STATE 17595 8. Well number Well No. 4 9. Permit number 64 -0006 -0 10. APl number 50-733-1007~-00 11. Field/Pool Middle Ground Shoal 12. Present well condition summary Total depth: measured 9215' feet Plugs (measured) true vertical 9202' feet Effective depth: measured 9142' feet Junk (measured) true vertical 9130' feet Cement Plug @ 9142' Casing Length Size Cemented Measured depth Structural Conductor 1003' 20" 1500 SXS 1003' Surface 1987' 13-3/8" 2500 SXS 1987' Intermediate 7151' 9-5/8" 765 SXS 7151' Production Liner 9215' 7" 1925 SXS 9215' Perforation depth: measured See attached sheet true vertical Tubing (size, grade, and measured depth) 3-1/2", 9.2#, N-80, @ 7634' Packers and SSSV (type and measured depth) Baker "FB-I" 85-40 Packer @ 7031' & 7553' True verticaldepth 1003' 1987' 7147' 9211' 13. Attachments Description summary of proposal X Detailed operations programX_ BOP sketch X 14. Estimated date for commencing operation 115. 16. If proposal was verbally approved I Oil X Gas Name of approver Date approved Service 17. I hereb~/.~e~~ue and correct to the best of my knowledge. Signed G. RusselISchmidt Title Regional Drilling Manager FOR COMMISSION USE ONLY Status of well classification as: __ Suspended__ Date Conditions of approval: Notify Commission so representative may witness Plug Integrity _ BOP Test Location clearance -- __ Mechanical Integrity Test_ Subsequent form required 10- ~0~ Original Si,3.ned By Approved by the order of the Commission David W. johnston Approval No. Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE ~r~oratio~ ~¢or~ ZONE CONDITION MEASURED TRUE VERTICAL DEPTH (FT) DEPTH (FT) TYONEK A POOL Cement Squeezed 5310-5320 5307-5317 5450-5470 5447-5467 5530-5545 5527-5542 5580-5610 5577-5607 5650-5660 5647-5657 TYONEK B POOL Cement Squeezed 5920-5970 5917-5967 TYONEK C POOL Cement Squeezed 6136-6186 6133-6183 TYONEK E POOL OPEN 6775-6785 6771-6781 6810-6825 6806-6821 , TYONEK F POOL OPEN 7080-7130 7076-7126 7240-7260 7236-7256 7265-7275 7261-7270 TYONEK G-1 Cement Squeezed 7375-7460 7370-7455 TYONEK G-2 Cement Squeezed 7475-7520 7470-7515 TYONEK G-3 OPEN 7580-7765 7575-7760 TYONEK G-4 OPEN 7785-7800 7779-7794 , 7820-8035 7814-8029 8070-8145 8063-8138 8170-8180 8162-8172 8205-8260 8197-8252 8370-8500 8361-8491 8610-8770 8600-8760 8865-8940 8855-8930 TYONEK G-5 OPEN 8985-8995 8974-8984 9010-9030 8999-9019 TYONEK G-5 OPEN 9050-9120 9038-9108 RECEIVED JAN 2 0 199 ,Alaska Oil & Gas Cons. Comm[ssior~ Anchorage MGS 17595 BAKER PROPOSED WORKOVER JANUARY 8, 1993 PROCEDURE 1. MOVE RIG OVER MGS 17595 #4, LEG #5, SLOT #1. 2. KILL WELL WITH FIW. 3. INSTALL BPV, NIPPLE DOWN TREE, NIPPLE UP BOPE. 4. PULL AND LAY DOWN SINGLE STRING. 5. BURNOVER AND RECOVER PERMANENT PACKER AT 7029'. 6. BURNOVER AND RECOVER PERMANENT PACKER AT 7554'. 7. CLEAN OUT FILL TO 9142' ETD ( TAGGED AT 8452' ). 8. RUN BIT AND SCRAPER TO ETD. CHANGE OVER. 9. PRESSURE TEST CASING WITH AN RTTS PACKER. 10. TCP PERFORATE " EFG " ZONE (465') AT INTERVALS: 8370'-8500' DIL (130') 8610'-8770' DIL (160') 8865'-8940' DIL ( 75') 8985'-8995' DIL ( 10') 9010'-9030' DIL ( 20') 9050'-9120' DIL ( 70') 11. SET PERMANENT PACKER AT 8300'. SET ISOLATION PLUG. 12. TCP PERFORATE "BC" ZONE (540') AT INTERVALS: 7580'-7765' DIL (185') 7820'-8035' DIL (215') 8070'-8145' DIL ( 75') 8170'-8180' DIL ( 10') 8205'-8260' DIL ( 55') 13. RUN SINGLE "SELECT" 3-1/2" COMPLETION WITH TWO ADDITIONAL PACKERS FOR ISOLATION (SEE SCHEMATIC). 14. CHANGE OVER BACK SIDE TO INHIBITED FLUID. PERFORM MIT TEST. 15. REMOVE BOPE AND INSTALL DUAL TREE. 16. RELEASE RIG AND MOVE OFF. DAYS 314 112 1 1/2 1 1-1/2 1/'2 1/2 Alaska Oil & Gss Cons. Anchorage- ali i i m m dmm mmmml i P.__e.~J. n e~t Data: Spud Date: Surface Location: Subourfaoe Location: ~levatJon: TO: Caring: PerforatJonm: Initial Potential: Initial St. Jrnulo~on: R__ _e~'vo. Ir .D~. a__~: Cored Intervals: DST Intervall and ReoulLo: UIDDIF' OROUND SHOAL ADL 17595 WELL NO. 4 KENN ac LOWER KE3~IAI CONOLOMERATE PLATFORM BAKER ev'24/64 Flfth leg oontflev~ ond oaloson, NE of Leg 2 lg71' FNL, 610' FWL, Sea. 31, TSN, Rt2W, S.M. To - ~Ole' FNL, 032' ~ Sea. 31, 11N, R12W, S.U. 75' RKB MSL g21 $' T~D g202' g142' 20", g4~l CeMng M,t at 1003' with 1500 Ix aement 15 3v~", 54.5 and 811f C_aslng Nt at 1987' with 2500 mc cement g ~v~8", 36, 40 and 4~.51~ Casing Ht at 7151' w/765 mc emt 7", 23 and 28~ Liner set at 8935-g215' with 1400 Ix cement 7". 2,3. 28 and 2g~ Uner est at 0-8635' w~:h 525 mc cement A: 5310-$320% 0-1: 7375-7480'e 5450-5470'* 0.-2: 7475-7520'e 5530-5545'e G--3: 7~80-7765' sseo-selO', 0--4: 7785-7800' 5650-5660'* 7820-8035' B: 592O-Sg70'e 8070-8145' C: 81,~6-8188'* 8170-8180' E: 8775-8785' 8205-8280' 6810-- 6~25' 8370- 8500' F: 7080-71`30' 8810-8770' 7240-7280' 8885-8940' 7285-7275' · ~ement Squeezed [FO 1180 BOP'D et 150~ FTP, OOR 392 Depth 1. 8" Cameron Single DCO--F138 Nora hanger 35' 2. ;3 1/2" Buttreao tubing pup 38' ;3. ;3 1/2" Buttress tubing pup 44' 4. ;3 I/2" Buttress tubing 7028' 5. Seal Locator 702g' 8. 4" Seal bore 7031' 7. Wit out Extandon 7037' 8. 5" 8F~ and S" Std X0 7038' g. Seal Bore extanslan 7047 10. S" Std and 3 1/2" Buttr~ XO 7048' 1 t. 3 1/2" Bu~,re~ tubing 7445' 12. CQmr. Q K-Bug UQndrefl 7452' 13. `3 1/2" Buttress tubing 7~3' 14. Seal L~¢ator 7554* 15. Seal A~rnbly 758e' 18. 3 1/2" Buttress tubing 7800' 17. OUs X-nipple 7601' 16. 3 1/2" 9utb-ees tubing 7633' lg, Uuteshoe 7634' 0--.~: 8985--Bggs' 9010-0030' 9050-9120' DteHI and (Iteoel x lOX Control Flow Squeeze an Intervals 8400-80' and ~05-6~', affv ~ In wat~ ~ wat~ ban mud. NI o~ zones ~ In dle~ and flw na~ml. A-zone: 53126. 5441s. 5446 1/2m, $585e BCD zone: 5860m, 5gA0m, 8182h 81ese, 8270~. 8424e. 6518s. 8528s [FO: 7388-g7'. 73gg-7410', 7458-82% 7522-47'. 7597-7810'. 7715-42'. 8181-g8', 8600--15% 7078~, 7088s, 7101s [FO: 7151-7458' FI.W g hm at 141-1050 BOPD w/0-575 psi FTP. FS1P ,3433 Irlnol IrLW ~ BOPO and OOR 885 et 075 pd p~m hole lES. OR-Sordo, MLL, Dendty et~r and Spinner Survey 12/g/72 Baker FB-1 85-40 Packer .(A~ run 4/lg/94) Baker 1=9-1 85--40 Packer F'gD g142' 113 9215' 7" 23, 28 . & 28f Uner Top at 0' 13 ~/9" 54.5 1987' ,) --5.310' -- 5970' --8138--8188' '4,CO' '475--7520' 23& 2~ uner 43.~ 71 7g120' FILL-UP KILL LINE I / '~ FLOW ANNULAR BOP 13%"3000 psi PIPE RAMS 13%"$000 psi BLIND RAMS '13%"5000 psi , I ~ [ DRILLINC / [P'~[/q-[-[~x ~ SPOOL ~ ~a~¢ooo p~~ 4" 5000 psi il t~ 4" 5000 I [ PIPE RAMS ] 135/ff'5000 psi CHOKE psi LINE~ RISER ~3%" 5000 psi Alaska Oil & Gas Cons. Anchorage COOK INLET PLATFORMS BOP£ STACK 13 %" 5000 psi II I I TO 10" CROWN VENT BLOW DOWN GAS BUSTER 1 O' TO SHAKER TO CHOKE PANEL SWACO CHOKE NOTE: SWACO CHOKES EACH HYDRAULICALLY ACTUATED VIA REMOTE. TO BOPE MANUAL SWACO CHOKE i i i ii iiii i i CHOKE MANIFOLD Unocal PLATFORM RIGS 4-1/16" & 3-1,/8", 5M MSP April 6, 1990 Amoco Production Company Denver Region 1670 Broadway P.O. Box 800 Denver, Colorado 80201 3034~30-4040 Alaska Oil and Gas Conservation Commission 3001 Porcupine'Drive Anchorage, AK 99501 Attention: Larry Grant File: KJO-396-WF Information Requested Middle Ground Shoals Wells t7595 ~501, ~4 and ~6 and Granite Point Well 17586 ~5RD Platforms Baker and Bruce, Cook Inlet, Alaska Per your request I am forwarding a copy of the directional surveys for the Middle GroUnd Shoals wells. The tape log for the Granite Point well that you requested is not available. If you require any additional information on Amoco operated wells in Alaska, please contact Julie Victor at (303) KJO/fjb cc: J. A. Victor R CE VED APR ! 2 !990 .0il & Gas C0n~ C0mmissl0n F'AN '' Middle Ground Shoal No,'4 ! FI!'.-.LD M£ddle Groupd Shoa~ :.";: T R. OL E.IJIVI COi.'i'POl~A'l' ION &TVD - '" T VD 1050.00 · 2064.80 . 1050.00 · 1014.80 AN 13.00 1050 '?' i/2 2065 2-1/2 Es~ N-54JE 1015 LOC. 591~'g"'6f-k)i'[ i97i' '§"0[ NL, .. bF. S '17,88 ., _ .. ... . . N- E ' °1 ..13. O0 17.88 2598 3114 3424 3610 3940 .. A o40 .. .4688 4972 5384 54O8 .5609 5892 6202 6,'., 62 6703 69'37 7560 · '--- -'., 2-1/2 2 ;. ,. 2-1/4 ...- 2-1/2 ' '--" '' 2-i/2 ... .. "." 2-1/2 . 3 -- 1-3/4 .. '" l- 3/4 ]=3/4 ~/'~ ,,, C-'.. ~,f~.,' o 2 I: 2 2-1/4 0 5o .z: l ... " 2-1/4 ?os, /: ' ~-1/4 2~75 6r ~ ' ..... .:! . . 5-3/4 7918 ~.3tZ' '} 6 ..... '~ 8505 ;. . i . 4-3/4 ( 9215 '"D~;'t~.:'": 4-3/4 · ....: . .: ..'{ . , , , . , ,~'. f . BH Loc. = 341' E and '":": '. ..... ;or 345' N 8 -. .... :.L~.I 'f-: . , . .. ':: .7 "' "' : .' ' .. ...' ' I';" ' ~ ' ' Est N- 54-E Est N-54-E Est N-54-E Est N- 54-E Est N- 54-E · Est, .N-54'-E Est .N-.54- E' Est N- 54-E Est N- 54-E Est N- 54-E' N-62-E N-53-E . . ~. N- 52-E N-48-E N-57-E N- 50-E , N- 62-E N-76-E Eas~ S-69-E · S-59-E '.S-59-E 533 516 310 . 186 .. -" '330 , 3O0 · 312 , ', 136 ~ 284 ~ 412 24 " 201 283 310 i - 200 .... 2 4 i · ~,'~ t ;_ _,,.~ 2OO ... 423 ~ 358 : 587 ' I'-'' ': '1 710 · 55' N .of surface .loca. @ 9'2: )o 51,' E," '. ' :... · · .... .../:; :.,.'. :..[".':: - . .... · % .. ... %- i .. · 532.73 515.48 309.81 185.85 329.67 299.70 311 69. 135 81 283 72 411 79 23 99 2'00 94 262 86 309 81 259 84 7~ gl 233 81 199.84 2597.53 3113.01 3422.82 3608.67 3938.34 4238.04 4549.73 4685.54 4969.26 5381,05 5405.04 5605'.98 9.60 · 1~.20 6.35 5.24. 8.45 7.68 7,98 4.19 -. 7.26 7.42 -I 0;.34 ] I I'. '3.18 ' 420.88 [ .?:~v,., 7553.83 -- 356.03I g} o ~ 7 90'9". 86 ,.. 585,00- I ,, , 8494.86 . - 707.59 / .. -. . · 5888.84' j.- 5/32 ' 6198.65 I '7.25 I 6458.49 '1 4,94 i .... " 6G99 30 . ' ~'.09 ~ " · ,..~3'. 11 4.31 ~ 7132.95'- 1..90' I ~ .' ' I 13.17 18.21 8.74 -5.91 .11.65 10.59 11.01 5.75 10.02 10.19 0.65 4.20- 6.82 8.03' 7.61 '~ 7.26 8.11 5.62 42.38 34.94 · · ,. . - . 22.60 35.80 42:15 47.39 55.84 63.52 71'. 50 75 ..69 - 82.95 ~ ,'c 90.37 ·90,71 93. 8,9 99',21 106.46 ~'~' a') 111'.40 I1~'~'~' 117.49 ',lj~ ' 12i.80//~ .' 123~70/2~'~:?.-, .,,:. 123.70 "':"F'°'''''' -;. ' 110.27 q~33' 5~.'S9"i "~ ' · 92.09 I . ... · ' I ,' : .; · ; . . ~,'con~;'.C a~miss~ .. .... ., .- . ~ ~, . ... . . . ' 31.05 49.26 58, O0 63.91 .75.56 86.15 97.16 -" 102.91 123 12 123.77' 142.8'2 · 15 b9/jr,; 16 80 - 17 42 340.83 W. G. Smith District Manager Amoco Production Company Post Office Box 100779 Anchorage, Alaska 99510 907-272-8471 April 25, 1984 File' WGS-IO9-WF Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir- Middle Ground Shoal 17595 Well No. 4 Platform Baker, Cook Inlet, Alaska Attached in triplicate is a State of Alaska Form 10-403, Sundry Notices and Report on Wells, subsequent to'pulling and replacing the tubing in Middle Ground Shoal 17595 Well No. 4. The high annulus pressure was caused by a hole in a tubing collar. The entire tubing string and seal assembly was replaced and the well was returned to injection. Please direct any questions concerning the project to Kip Clapper in our Anchorage office. Very truly yours, W. G. Smith District Manager Attachment KCC/dmh RECEIVED APR 2 719B4 Alaska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA ALASKa, ,.)IL AND GAS CONSERVATION [..,MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] 2. Name of Operator Amoco Production Company 3. Address P. O. Box 100779, Anchorage, Alaska 99510 4. Location of Well COMPLETED WELL OTHER [] Leg 5, MGS Platform Baker 1,916' FNL, 932' FWL, Sec. 31, T9N, R12W, S.M. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 75' KB, RKB ! ADL 17595 , , , 12. 7. Permit No. 64-6 8. APl Number 50- 733-100 7000 9. Unit or Lease Name Middle Ground Shoal 10. Welt Number 4 1 1. Field and Pool ,.,,, Middle Ground Shoal Heml oc k Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation J~ Abandonment Repair Well [] Change Plans [] Repairs Made I--I Other Pull Tubing [] Other [] Pulling Tubing · (Note: Report mu ltipte comptet ions on Form t0-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operat,ions (CJearlv state all.pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Amoco Production Company performed the following..Work· . e 4, 5. Killed well with filtered COok-Inlet water. Set back-pressure valves, nippled, down tree'., nippled up BOP's and tested to 2,500 psi. Pulled back-pressure valves. Pulled tubing and Seal assembly. 'Ran in new tubing and new seal assembly. Returned well to injection status. Currently injecting 2400 BWPD at 3800 psi. ' - RECEIVED APR'2 7 1984 Alasl<a 0ii & Gas Cons, Commission Anchorage 14. I herebv certify that the foregoing is true and correct to the best of my knowledge. The space below for Commission use Title Di strict Manager' Conditions of Approval, if any: Date /1 /gR/RI] Approved by By Order of COMMISSIONER the Commission Date .......... _, , Form 10-403 Rev. 7-1430 Submit "lnientions" in Trtphcate and "SubseQuent Reports" in Dupl,cate L. A. Darsow District Superintendent Amoco Production Company Post Office Box 100779 Anchorage, Alaska 99510 907-272-8471 March 19, 1984 File: WEN-194-WF Mr. C. V. Chatterton, Chairman Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Notice of Intent MGS 17595 Well No. 4 Platform Baker, Cook Inlet, Alaska Attached in triplicate for your approval is State of Alaska Form 10-403, Sundry Notices and Reports on Wells, regarding our plans to work on MGS 17595 Well No. 4. High annulus pressures on this injection well · indicate a leak in the packer seal assembly. We plan to kill the well, pull the tubing and first seal assembly, replace the seal assembly, rerun tubing, and return the well to injection. Yours very truly, W. E. Nielsen Supervi sor-i n-Charge Attachment KCC/dmh GaS Cons. commission Ant, borage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WE LLX~ 2. Name ~if Operato~ , Amoco vroauction Company 7 .cP~ r_m~ t No. OTHER [] 3. Addre~. O. BOX 100779, Anchorage, Alaska 99510 4. Location of Well Leg 5, HGS Platform Baker 1,916' FNL, 932' EWL, Sec, 3:[, T9N, R12W, S.M. 5. Elevation in feet (indicate KB, DF, etc.) 75' KB, RKB 6. Lease Designation and Serial No. ADL 17595 8. APl Number 50- 733-100 7000 9. Unit or Lease Name Middle Ground Shoal 10. Well Number 4 11. Field and Pool Middle Ground Shoal Hemlock 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well ~X Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state alt pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Amoco Production Company plans to' le e . Circulate and kill well with weighted brine. Set back-pressure valves, nipple down tree, nipple u.p BOP's. and test to 2,500 psi. Pull back-pressure valves. Pull tubing and defective seal assembly. Run tubing and seal assembly. Set back-pressure valves, nipple down BOP's,_ nipple up tree and test to 4,000 psi. Pull back-pressure valves. Return well to injection status. 14. I hereby certify that the foregoing is true and correct to the best of mv knowledge. RECEIVED MAR 2 2 1984 Alaska 0il & Gas Cons. Commission A L The space below for Commission use Title Supervi sor-i n-Charge Date 3/16/84 Conditions of Approval, if any: Approved by 6RIGINAI.' SIGII[i BY LOflXlE IL SIilTI _Approve~ Co~. ~eturned By Order of COMMISSIONER the Commission Date Form 10403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate L. A. Darsow District Superintendent. March 11, 1983 Amoco Production Company (USA) Post Office Box 779 Anchorage, Alaska 99510 907 - 272-8471 File: LAD-274-WF Mr. C. V. ChattertJn, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Subsequent Reports, Sundry Notices and Reports on Wells (Form- 10-403) GP 18742 Well Nos. 10, 11, 19, and 25, MGS 17595 Well Nos. 4 and 15, and West Foreland Well No. I This letter is in response to your letter of February 16, 1983 on the above subject. Attached in duplicate are the Subsequent Reports outlining the work completed on Granite Point 18742 Well Nos. 11, 19,. and 25. Also attached in duplicate are the Subsequent Reports on Middle Ground Shoal 17595 Well Nos. 4 and 15 indicating that the work on these wells was canceled. Concerning the other two wells in question, our records show that a Subsequent Report was submitted for Granite Point 18742 Well No. 10 on January 14, 1983. A copy of that letter and duplicate copies of the Form 10-403 are attached. The work on the West Foreland Well No. I is. pending at this time. We will notify you upon completion of this work. We apologize'for the delay in submitting these reports and we will make every effort to avoid this situation in the future. Yours very truly, L. A. Darsow District Superintendent Attachments RLW/seh ' RECEIVED Alaska Oil & (];as Cmos. Gummissior~ Anchorage STATE OF ALASKA ""-~. ALASKA ~,,- AND GAS CONSERVATION CC,,,MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DR ILLING WELL [] COMPLETED WELL [2] 2. Name of Operator 7. Permit No. Amoco Production Compan.v 64-6 3 Address 8. APl Number P.0. Box 779, Anchorage, Alaska 99510 50-733-100-7000 OTHER [] 4 Location of Well Leg 5, MGS Platform Baker 1916' FNL, 932' FWL, Section 31, T9N, R12W, SoM. 5. Elevation in feet (indicate KB, DF, etc.) 75' NSL RKB 12. I 6 . Lease Designation and Serial No. ADL 17595 9. Unit or Lease Name Middle Ground Shoal 10. Well Number 4 11. Field and Pool Middle Ground Shoal Hemlock Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF' (Submit in Triplicate) Perforate ~ Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing --I Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Amoco planned to repair the communication to the annulus in this injector. However, the pres~eased and a decision was made to suspend the work. Alaska Oil & Gas Oons~ 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed W~.~)~~_ Title District Superintendent Th~ spac~ below for Comm~ss,on u~~ Conditions of Approval, if any' Approved by By Orde~ of COMMISSIONER the Commission Dale Form tO-403 Rev. 7-1-80 Submit "Intentions" m Triplicate and "Subsecluent Repo, ls" in Duplicate STATE OF ALASKA ALASKA ~ AND GAS CONSERVATION C~ISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator Amoco Production Company 3. Address P.0, Box 779, Anchorage, Alaska 99510 4. Location of Well · Leg 5, MGS Platform Baker 1916' FNL, 932' FWL, Section 31, T9N, R12W, S.M. 5. Elevation in feet (indicate KB, DF, etc.) 75' MSL RKB 6. Lease Designation and Serihl No. ADL 17595 7. Permit No. 64-6 '8. APl I~umber 5o-733-100-7000 9. Unit or Lease Name Middle Ground Shoal 10. Well Number 4 11. Fie d and Pool Hiddle Ground Shoal Hemlock 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing l-] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] RePairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date oi starting any proposed work, for Abandonment see 20 AAC 25,105-170). Amoco planned to repair the communication to the annulus in this injector. However, the pressure~-F~s decreased and a decision was made ~end the work. 14 I hereby certify that the foregoing is true and correct to the'best of my knowledge. The space below for Commiss'on u~~''~k~'~ Title "District Superintendent Conditions of Approval, if any: RECEIVED MAR 1 198'3 Alaska 0il & Gas Cons. Commission Anchorage Approved by' , BY Order of COMMISSIONER the Commission Form 1'0-403 Rev. 7-1 ~80 Date~ .,:_; ...... , _._ Submit "Intentions" in TriPlicate and "Subsequent Reports" in DuPlicate February 16, 19 83 Amoco Production Company P.O. Box 779 Anchorage, Alaska"9 9510 ~ ~e~ Subsequent Reports, Sundry Notices and Reports on ~ells (Form 10-403 } For the following lists of "Notice of Intention To~# Sundry Notices and Report on Wells (form 10-403) this office does not have on record the "Subsequent Report of~" defining the action taken on the' approved intention. Please advise this office by Subsequent Report of'the disposition of the intention. Wel 1 Amoco Date Brief Descrip_t. ion of... !ntenti0.n .1, =-_ , . MCS 15 112/80 CP 1.9 6/10/8'0 MGS 4 3/31 82 GP 11 4/8/82 . GP 25 6/8/82 West Foreland 1 10/15/82 GP 10 10/26/82 Perforate "G" zone Hemlock Reperforate MD Kenai C-4 Pull tubing, replace packer· Pull tubing, reperforate, set Eobe Pull tubing, clean out., run Kobe Periodic testing shut in gas wel 1 Pull tubing, repair leaks Sincerely,. · --- ' / t.'/. "_. / Commissioner LCS/JKT/9 lh ' · . L. A. Darsow District Superintendent March 3, 1982 File' LAD-194-WF Amoco Production Company Post Office Box 779 Anchorage, Alaska 99510 907 - 272-8471 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Si r: Notice of Intent MGS 17595 Well No. 4 Platform Baker, Cook Inlet, Alaska Attached in triplicate for your approval is State of Alaska Form 10-403, Sundry Notices and Reports on Wells, regarding our plans to work on MGS 17595 Well No. 4. High annulus pressures on this injection well indicate a leak in the tubing or packer seal assembly. We plan to kill the well, pu-~'~T~the tubing down to the first packer, replace any defective tubing or seal assembly, rerun tubing, and return the well to injection. Yours very truly, L. A. Darsow District Superintendent Attachment BFS/klt Oil & G~s C.,o~s. commissio~ ~,~chorage STATE OF ALASKA '~ ALASKA ..,iL AND GAS CONSERVATION CL,,vlMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. Amoco Production Company 64-6 3. Address 8. APl Number P. 0. Box 779, Anchorage, Alaska 99510 50-733 100 7000 4. Location of Well Leg 5, MGS Platform Baker 1916' FNL, 932' FWL, Section 31, T9N, R12W, S.M. Elevation in feet (indicate KB, DF, etc.) 75' MSL RKB 6. Lease D~l~_atif~sSerial No. 9. Unit or Lease Name Middle Ground Shoal 10. Well Number 4 11. Field and Pool Middle Ground Shoal Hemlock 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [Xl Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Amoco Production Company proposes to' 1. Kill well. 2. Pull tubing to 7031' MD. 3. Replace defective tubing/packer seal assembly. 4. Run tubing. 5. Return well to injection. o~ ~o~ RECEIVED' MAR 0 s Alaska Oil & Gas Cons. Commission Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~I~~O~.~.~, Title District Superintendent The space below for Commission use Date 3/3/82 Conditions of Approval, if any: Approved by COMMISSIONER By Order of the Commission Date Form 10~,03 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate L. A. Darsow District Superintendent November 17, 1980 Amoco Production Com; Post Office Box 779 Anchorage, Alaska 99510 907 - 272-8471 Fi 1 e: LAD-1178-WF Mr. Hoyle H. Hamilton, Commissioner Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Subsequent Report Repair of MGS 17595 Well No. 4 Platform Baker, Cook Inlet, Alaska Attached in duplicate is a State of Alaska Form 10-403, Sundry Notices and Reports on Wells. The G-1 and G-2 zones in MGS 17595 Well No. 4 were cement squeezed to shut off a 'thief zone and repair communication between the two zones, which was discovered during this workover. The G-2, G-3, and G-4 zones were reperforated and injections separated with packers and a mandrel. Yours very truly, L A. Darsow Di stri ct Superintendent Attachment BFS/klt RECEIVED NOV 1 8 1980 ~asla 0il & I~as Cons. Commission / ~' STATE OF ALASKA ~-~-,~ ALASK*' JIL AND GAS CONSERVATION C~,...,VllSSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator 7. Permit No. Amoco Production Company 64-6 3. Address 8. APl Number P. 0. Box 779, Anchorage, Alaska 99510 so-133-10070 4. Location of Well Fifth Leg Cantilever and Caisson NE of Leg 2, MGS Platform Baker 5. Elevation in feet (indicate KB, DF, etc.) 75' MSL RDB 12. I 6 . Lease Designation and Serial No. MGS 17595 9, Unit or Lease Name Middle Ground Shoal 10, Well Number 4 1 1. Field and Pool Middle Ground Shoal Hemlock Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) -- (Submit in Duplicate) Perforate [] Alter Casing [] ~ Perforations ~ Altering Casing Stimulate [] Abandon [] Stimulation [-'1 Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing ~ (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). 9/22/80- 10/15/80 Cement squeezed G-1 and G-2 zones with 845 sacks cement; reperfed G-2, G-3 and G-4 zones with 4" casing gun at 2 JSPF; set packers at 7050' and 7550' to separate injection into the G-2 zone from injection into the G-3, G-4 and G-5 zones; injection to the G-2 zone will be through a mandrel and regulator; injection into G-3, G-4 and G-5 zones will be through the tailpipe. Squeezed: G-l' 7375-7460' G-2: 7475-7520' Reperforated' G-2' 7485-7520' G-3: 7580-7765' G-4: 7785-7800' RECEIYEO NOV 1 8 1980 ;Alaska 0il & Gas Cons. Commls$10n Anchorage 14. I hereby certify that the foreg~s true and correct to the best of my knowledge. Signed Title Distri ct Superintendent The space below for Commission use Date ...... 11/17/80 . Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate Form 10-403 Rev. 7-1-80 November 17, ~1980 Mr. George Stadnicky Union/Oil Company cf California P. O. Box 6247 Anchorage, Alaska 99505 Re: Preparation of Petrographic Thin-Sections of Cores from State Well .Sample Library. Dear George: Pursuant~. to our November 13, 1980 discussion on the captioned subject,'pe~mfssign is hereby granted to Union Oil Company of CalifOrnia. to 'cut a maximum of 1 cc, of core 'material per foot of core from the State's set of core chips from the following wells 'for~the sole purpose of preparing thin-sections within the designated intervals, subject to the conditions set forth below: Sample Set No Well Interval 174 81 124 48 109 215 17 63 93 Amoco Albert Kaloa #1 Amo¢o~MGS 17595 #4 ARCO W. Foreland Unit #3 Pan Am Tyonek St. #1 SOCAL Naptowne Unit #24-8 Union Granite Pt. MUC I-1 Halbouty Ak D&M King Oil #i-B Pan Am MGS 17595 92 Mobil Granite Pt. #1 13,067' .- 13,078' 7,340' - 8,196' 9,170' - 9,286' 12,832' - 12,488' 13,072' - 13,108' 12,975' - 13,017' 13,300' - 13,439' 10,554' - 10,557' 11,245' - 11,257' Cuts from the state's set of core chips are to be made only out of those individual envelopes or'bags in which the total Volume of core material is greater than 10 cc. Union will provide the State with a list of the specific core footages from which material was extracted. Union shall bear all costs entailed and will provide Alaska Oil and Gas Conservation Commission with a complete set of all thin-sections prepared. All thin-sections and ali core residue. materials are to be received by the Commission by approximately February 15, 198I. No core material is to be retained by Union. Mr. George Stadn..~y -2- November 17, 1980 All materials are to be transmitted direct to the Commission and are not to be examined by outside parties. We are pleased to work with you in this mutually beneficial endeavor and look forward to your company's continued exercise of care and good judgement in the handling of this limited quantity of well material. I know we both understand that the State's well sample library is public property and that grant- ing Union permission to extract portions of material from this library for the Purpose of preparing the indicated thin-sections enhances the value of the library and is in the public interest. William Van Alen Petroleum Geologist cc ~ Mr. Art Trevena Union 0il Co. of Calif. P. O. Box 76 Brea,.California ~"~A ~ be  OX~ L. A. Darsow District Superintendent August 20, 1980 File' LAD-877-WF Mr. Hoyl e H. Hamil ton, Commissioner Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Amoco Production Post Office Box 779 ~'1 Anchorage, Alaska 99510 907-272-8471 ,,/. .* ....... 1 s ~OL/ I ST',,T TEC ¢I ~AT TE~ CONFEr: FILF: Dear Sir: Notice of Intent Repair of MGS 17595 Well No. 4 Platform'Baker, Cook' Inlet"Alaska Attached in triplicate for your approval is a State of Alaska Form 10-403, Sundry Notices and Reports on Wells. To correct a poor injection profile and repair a tubing leak in MGS 17595 Well No. 4, we propose to pull the tubing, cement Squeeze the G-1 zone, reperforate the G-2, G-3, and part' of the G-4 zones, and separate and control injections into the G-2 zone from the G-3, G-4, and G-5 zones with packers and a mandrel while runni.ng a new tubi.ng stri.ng. Yours very truly, L. A. Darsow Di stri ct Superintendent Attachment BFS/llr Form 10-403 (REV. 1-~0-73 Submit "1 ntentions" In Trlplicate & "Subsequent Reports" In Duplicate ~" ~, STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) WELL Water [njecti0n Well 2, NAME OF OPERATOR Amoco Production Company 5. APl NUMERICAL CODE 50-133-10070 6. LEASE DESIGNATION AND SERIAL NO. MGS 17595 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Hiddle Ground Shoal 3. ADDRESS OF OPERATOR 9,WELL NO, P.O. Box 779, Anchorage, Alaska 99510 4 4. LOCATION OF WELL Atsurface Fifth Leg Cantilever and Caisson, NE of Leg 2, MGS Platform Baker 13. ELEVATIONS (Show whether DF, RT, GR, etc.) RDB 75' MSL 14. Check Appropriate Box To Indicate Nature of Notice, Rel 10. FIELD AND POOL, OR WILDCAT Hemlock 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 31, T9N, R12W, S.M. 12. PERMIT NO. 3ort, or Other Data NOTICE OF INTENTION TO; TEST WATER 5HUT-OFF r-~ PULL OR ALTER CASING r'~ FRACTURE TREAT ~ MULTIPLE COMPLETE ~!------I SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (ot.er) Cement squeeze; set pkrs and mand~.l.d SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAI RING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE= Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent detailS, and give pertinent dates, Including estimated date of starting any proposed work. In order to correct a poor injection profile and repair a tubing leak we propose to- 1. Cement squeeze the G-1 zone (7375-7460'). . Reperforate the G-2 (7480-7510), the G-3 (7590-7755') and part of the G-4 (7785-7800') zones. e Separate injections into the G-2 from the G-3, G-4, and G-5 zones with packers and a mandrel. e Run a new tubing string. AUG 5 Alaska Oi~ a 16. I hereby certify that the for. egJlh~9 is true and correct / SIGNED .: - TITLE District Superintendent (This space for State office use) CO~~!ONER APPROVED BY ,, CONDITIONS OF APPROVAL, IF ANY= ~Y~~~~ OF T~ COMMiSSiON See Instructions On Reverse Side DATE DATE 8/20/8O / / Approved Copy Returned Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 July 15, 1974 File: GJR-667-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 300i Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Re: Monthly Reports of Drilling and Workover Operations Attached are the State of Alaska Forms P-4 reporting workover operations for MGS 17595 Well No. 4, MGS 17595 Well No. 6, and Granite Point 18742 Well No. 5 for the month of June 1974. Yours very truly, Area Superintendent Attachments ,till ~ ? ~974 Oi¥ISI~N OF O~L ~N~ :l"orm ~o. RgV, ~- I-?0 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS Water Injection 2. NAME OF OPE~ATOR Amoco Production Company ~ ADDRESS OF OPERATOR P. O. Box 779, Anchorage, Alaska 4 LOCATION OF At surface: 1971' FNL, 591' FWL, Sec. 31, T9N, R12W, S.M., Caisson off Leg No. 2, MGS Platform Baker SUBMIT IN IiIUP. LIcA'r~ 99510 [5 Alii NUAIERICAL CODE 50-133-10070 6 LF2kSE DESIGNATION AXD SE1RIAL NO. ADL-17595 T IF YNDIA]~. ALO/'iEE OR TRIBE NAME 8. LL'IT FA/~ OR !-~.~SE NA~4E MGS State 17595 9 WF~.T, NO 4 i0 F~ A_ND PO~)L. OR WILDC~kT Middle Ground Shoal il SEC, T.. P,.., M. ('BO'I'I"OM HOI..~ OB,meT'nm) Sec. 31, T9N, R12W, S.M. 12 PE~/A'IIT I~0 64-6 REP~)RT TOTAL DEPTH AT END OF MONTH. CIiANGES IN HOLE SIZE, CASING AND Ci~IENTING JOES INCLUDING DEPTH SET AND VOLUIVIES USED, pERFORATIONS. TESTS AND RESULTS FISHING JOBG JUNK IN HOLE AND SIDE-TRACKED HOLE A3~D ANY O.'I'f~R SIGNIFICANT CHA~GES IN HOLE CO1VDITIONS S~ary _of_ Operations D~ring June 1974: Injected water at the following volumes and pressures: Date BW Inj._ Hours Pressure June 8 702 13 1400 9 1283 24 1300 10 1345 24 1350 11 1112 20 1350 12 1491 21 1350 13 860 16 1900 14 1607 24 1750 15 1573 24 1650 16 1650 24 1650 17 1675 23 1675 18 1539 24 1700 19 1658 24 1720 20 1637 24 1750 21 1703 24 1770 22 1643 24 1785 23 1638 24 1800 24 1624 24 1810 25 1690 24 1835 26 1574 24 1850 27 1515 16 1775 28 1499 15 1775 29 1480 21 1850 30 1510 24 1760 i)I iSlON 0:f 0IL GAS Cumulative injected during June 1974 = 34,008 BW 14. I hereby ~ify that the [orego~. '.~true ~ ~ Area Superintendent mA~ July 15 1974 oil end gas conservatbn commiflee b~the 15~ of the succ~diflg ~n~, ~le~ Otherwise directed. Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 June 6, 1974 File: GJR-371-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Re: Monthly Report of Drilling and Workover Operations MGS 17595 Well No 4 Attached is a State of Alaska Form P-4 reporting workover operations on the above well for the month of May 1974. Yours very truly, George J. Ross Area Superintendent At tachment JUN? 1974 ro~ x~o. t~.-4 STATE O, ALASKA R~'. ~- 1-70 OIL AND OAS CONSERVATION COMMITTEE SUBMIT IN DUPLICATE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. WKLL ~'~LL OT]~ER :2. NAME OF OP~-ATOR Amoco Production Company ......... ~.' A~d~ss oF oPm~TO~ P. O. Box 779~ ..Anchorage~ .A.!.a,ska ..... 99510 4. LOCAT/ON OF WELL At surface: 1971' FNL, 591' FWL, Sec. 31, T9N, R12W, S.M., Caisson off Leg 2, Platform Baker NU~m~A/. CODE 50--133--10070 LEASE DESIGNATION A%'D SERIAL NO. ADL-17595 IF INDIA~, AI~)TTEE OR TiRIBE NAME L~,'IT FARM OH LEASE NAME MGS State 17595 WELL .~O 4 FLELD A.~ID POOL. O2 WILDCAT Middle Ground Shoal s-c., r,, ~., ~.. (~o~o~ ~o~ Sec. 31, T9N, R12W, S.M. ,m~ir ~o. 64-6 13. REPORT TOTAL DEPTIq AT E/~D OF NIONTI-I. CI-IAI~GES IN HOLE SIZE. CASING A~ CEi~[ENT]NG JOBS INCLUDING DEPTH SET AND VOLLrlYiES USED. PEI~FORATIONS, TESTS AND RESULTS FISHING JOB~ JUNK IN HOLE AND SIDE-TI~ACKED ItOL~E AJCD A2qY OTI-IER SIGNIFICA/qT ~I3ES IAI HOLE CONDITIONS. Sq .mmary_ of.. 0Rerat.i.ons During _May 1.9.7.4; May 1 - 31: ~aiting on injection equipmen:. JUN 7 1974 DNBION OF OIL AND GAS ANCHORAGE i i i I I i i iii i ~ -- - ~ iii il i 14, l hereby c~ify that the forego~/~nd eorr~ szo~ ~~ . ~~ ~ Area Superintenden~ ~A~ June 6, 1974 May 7, 1974 File: GJR-293-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 DRAFT I sEC 1- CONFER: FILE: Re: Monthly Report of Drilling and Workover Operations MGS 17595 Well No. 4 Attached is a State of Alaska Form P-4 reporting workover operations on the above well for the month of April 1974. Yours very truly, George U. Ross Area Superintendent Attachment I974 OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS Amoco Production Company s. A~DR~SS o~"o¥'k~A~o'~ .... P. O. Box 779, Anchorage, Alaska 4. Lexicon Or w~nn At surface: SUBMIT IN DUPLICA'I'g 99510 1971' FNL, 591' FWL, Sec. 31, T9N, R12W, S. M., Caisson off Leg 2, MGS Platform Baker ~$. APl NLr~ERICAL CODE 50-133-10070 LEASE DESIGNATION AND SERIAL NO, ADL 17595 T IF INDIA~, ALOi ,~;l~ OR TRIBE NAME 8, L~IT F.~M OR ~ASE N~ MGS State 17595 g WE~ NO 4 lQ ~'~ ~ND P~L, OR WILDCkT ~iddle Ground Shoal '" n' s~c., T., ~., ~.. (~o~ no~ o~ Sec. 31, T9N, R12W, S.M. PEIRiVI IT NO. 64-6 13. ~EPO~T TOTAL DEP'rH AT END OF MONTH, C~IA. NGE, S IN HOLE SIZE. CASING AND CL-MENTING JOBS INCLUDING DEPTH SET AND VOLUM~ USED. PERFOP,-ATIONS, TESTS ~ 1R.ESULTS FISHING JOBS JU/~K IN HOLE AND $IDE-TI~CKED HOLE A~D A~IY O~/~I]51~ SIGNIFICANT ~Gli~ IN HOL~ CONDITIONS. Summary of Operations Durin~ April 1974: April 3- 4 Rigged up on well and drilled out cement 5175-5325'. Pressure-tested perforations 5310-5320' to 1500 psi. Milled out cement retainer at 5327'. April 5 Drilled out cement 5327-5~72' tions 5450-5470' to 1500 psi. at 5475'. · Pressure tested perfora- Milled out cement retainer April 6 'Drilled out cement 5475-5550' tions 5530-5545' to 1500 psi. at 5550'. · Pressure tested perfora- Milled out cement retainer April 7 Drilled out cement 5550-5622'. Pressure tested perfora- tions 5580-6610' to 1500 psi. April 8 Milled out cement retainer at 5625'. Drilled out cement 5625-5660'. Pressure tested Perforations 5650-5660' to 1500 psi. April 9 Milled out drillable bridge plug at 5900'. (continued on attached page) MAY 8 I974 BIVISION OF OIL AND GAS . . '~ -' '?J}ti~/~ t~ ....... 14. I he.by e f°rego~e ~ ~ oil Offal gOS conservatbn commiflee by the 15~ of the suec~ding mon~, ~le~ Otherwise directed. MGS 17595 Well No. 4 Summary of Operations During April 1974: (continued) April 10 April 11 'April 12 April 13-14 April 15-16 April 17. April 18 April 19 April 20-30 Cleaned out to 9135'. Perforated 6824-6825' with 4 jet shots. Set retrievable bridge plug at 5879'. Pressure tested casing to 1500 psi.' Moved retrievable bridge plug to 7220' and pressure tested to 2000 psi. Set packer at 6835' and pressure tested "F" zone (7080-7130') to 3000 psi for communication with "E" zone. Moved bridge plug to 7040' and pressure tested to 2000 psi. Set packer at 6193' and unsuccessfully attempted to establish injection into "E" zone perforations 6775- 6785' and 6810'6825' prior to squeezing. Perforated 6775-6785' and 6810-6825' with 1 JSPF. Set packer at 6193'. Established injections into perfora- tions and cement squeezed with 80 sacks,Class G cement. Drilled out cement 6609-6825'. PreSsure tested to 1500 psi. Attempted to retrieve bridge plug but unable to pull due to tight spot 6810-6813'. Pushed bridge plug to 9129'. Pressure tested casing 7000' to surface at 1500 psi. 'Ran GR-CCL 7100-9130'. Perforated 7240-7260'; 7265-7275'; 7375-7460'; 7475-7520'; 7580-7670'; 7840-8035'; 8170-8180'; 8205-8260'; 8865-8940'; 8985-8995'; 9010-9030'; and 9050-9120' with 2 JSPF. ~electively broke down perforations 7240-9120' with filtered Inlet water at 3200 psi. Set Baker Model "D" packer on wireline at 6855'. Pres- sure tested tubing and packer seal assembly to 5000 psi. Pressure tested tree to 5000 psi and casing-tubing annulus to 1500 psi. Rigged down. Hooked up injection equipment. 8 1974 April 19, 1974 , File: GJR-243-WF Mr. Morner L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 --I c. ~'~o~ ~ 2 G~OL .... CONFER: FILE: Re: MonthlY Report of Drilling and WorkoVer Operations MGS 17595 Well No. 4 Attached is a state' of Alaska FoTM P-4 reporting workover operations on the above well for the month of' March 1974.~ Yours very truly, Area Superintendent Attachment APR 2 2 ~974 I)~¥I$ION OF OIL AND G~$ STATE O~ ALASKA OIL AND GAS CONSERVATION COMMII-[EE SUBMIT IN DU'~LICA'I~ MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. ~. NAlvf~ OF OP~TOR Amoco Production Company i ADSR~ss Or'6~WOR ................ P. 0_. Box .7.79, ..Anchorages. Alaska ';( LOCA~O~ or w~.,. 99510 At surface: 1971' FNL, 591' FWL, Sec. 31, T9N, R12W, S.M., Caisson off Leg 2, MGS Platform Baker ~ API NUII~PdCA/~ CODE " 50-133-10070 ~ 'I~F~SE DESIGA1AT2ON AN'D SEBIAL NO. ADL 17595 8. 'L,~I'/~ .F.~RM OR LEASE .~M~ '" MGS State 17595 4 'lO" FIFJ~D A_ND P~L, OR' WfLDCkT Riddle Ground Shoal Sec. 31, TgN, R12W, S.M. - 64-6 13. REPORT TOTAL DEPTH AT END OF MONTH. C/TANGES IN HOLE SIZE, CASING AND CENiENTING JOBS INCLUDING DEPTH SET ~ VOL~ USED. P~ORATIONS, ~TS ~ ~SUL~ FISHING JO~ J~K L~ HO~ AND SIDE-~CKED HOLE ~D ~Y O~R SIGNIFIC~T ~G~ ~ HO~ ~ITIONS Su_mmary 9.f Operations During March 1974: March 15-19 Pulled existing downhole equipment and cleaned out to 9146'. March 20 Set drillable bridge plug at 5900' and cement retainer at 5625'. Squeezed perforations 5650-5660' with 90 sacks Class G cement. March 21 Set cement retainer at 5550'. Squeezed perforations 5580 -5610' with 165 sacks Class G cement. March 22 Set cement retainer at 5475'. Squeezed perforations 5530-5545' with 100 sacks Class G cement. March 23-26 Set cement retainer at 5327'. Squeezed perforations 5450-5470' with 125 sacks Class G cement. March 27 March 28 March 29 Set retrievable packer at 5160'. Squeezed perforations 5310 - 5320' with 70 sacks Class G cement. Squeeze unsatisfactory. Resqueeze perforations 5310-5320' with 75 sacks Class G cement. ~Moved~rig to MGS Well No. 13 to pull Kobe bottom hole assembly and stuck Kobe pump. APR 2 2 1974 i41' I hereby' 9~{_y tJ'~, t t~ ~o' ~1-~--~ -' ' · - , ,,,, .......... -_nNlglON___ w.,. _ m~--(~,~.k~~ ~ .~ Area Superintendent m'~ ~ m m m m mi mi , m m Il m mm mi i m mm m .......... I NOTE --~ep°~°n ;h,, fo(~, ~l required for $~ GOlendor ~;h~ regordJeee o~ ~he i;o?ue ~f oper~i~, ond ~ ~ filed }n Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 March 11, 1974 File: GJR-143-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: 'i' I ! CONFER: J: Re: Monthly Report of Drilling and Workover Operations MGS 17595 Well No. 4 Attached is a State of Alaska Form P-4 reporting workover operations on the above well for the month of February 1974. Yours very truly, George w~. Ross Area Superintendent At t achment MAR ! ,'"~ 1974 l"or'n't No. P---4 R]~,t, $-I~?0 STATE G, ALASKA OIL AND GAS CONSERVATION COMMI~EE SUBMIT IN DUPLICA'I~ MONTHLY REPORT O'F DRILLING AND WORKOVER OPERATIONS , , h ~i~AI~! ~LrRIE~CAL CODE 50-133-10070 P. O. Box 779, Anchor.age,. Alaska 99510 4. LO'~XTiON OF WELL 6 LEASE DESIGNATION AND SERIAL NO. ADL 17595 ? IF INDIA]~', ALOTTEE OR TRIBE NAME 0IL [] GAS WI;LL W~LL NAIVE OF OP~TOR 8. L~'IT. F~{ OR LEASE ~E ~oco Production Company ~GS S~a~e 17595 4 I0. Y~ ~ND P~L, OH WILDCAT At surface: 1971' FNL, 591' FWL, Sec. 31, T9N, R12W, S.M., caisson off Leg 2, MGS Platform Baker _ Middl.e ,,Ground Shoal I1. SEC.. T.. R., M.. ('BOT~OM ltOl..,E om,rmc-rrv-~ Sec. 31, T9N, R12W, S.M. 12. PEP, MIT NO, 64-6 13. REIP~I~T TOTAL DEPTH AT END OF MONTH, CHA.NGF.~ IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET A/xrD VOLLrMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JI3/VK IN HOLE A2JD SIDE-TRACKED HOLE AND ANY O'rH~-~ SIGNIFICANT ~GIiiS IN HOL~ CONDITIONS. S.u.mma _fy. o f. Operati_ens During, February ~ 1974: No work waS performed during February due to other higher priority well work. MAR i ~ 1974 DIVISION OF OIL AND S, Gm~ ...,4-.~.,~,.~,,~, .~, xa~=~a,= ~ Area Superintendent ~ March 11~ 1974 ..... ,,, -:: ,,- ~-- ~ ~ ..... - .- ,, , oil and gas conservotion commiflee bythe 15~ of the ;uoc~ding ~n~, ~le~ otherwiee directed. Amoco Production Company P. O. Box 779 AnchOrage, Alaska 99510 Feb ruary 12, 1974 File: G JR-0 86-WF Mr. Homer Lo Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Re: Monthly Report of Drilling and Workover Operations MGS 17595 Well No. 4 Attached is a State of Alaska Form P-4 reporting workover operations on the above well for the month of January 1974. Yours very truly, Area Superintendent At tachment Form No. P.--4 RID/. ~,- I- 70 MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS SUBMIT I~ DUPLICATI: 1. WI;LL W~ILL OTH~I~ 2. NAME OF OP~ATOR AMOCO PRODUCTION COMPANY P.O. Box 779, Anchorage, Alaska 99510 4. LOCATION OF WELL At surface: 1971' FNL, 591' FWL, Sec. 31, T9N, R12W, S.S., Caisson off Leg 2, MGS Platform Baker. ir W-APl NI.SIERICAL CODE 50-133-10070 L~SE DESIGNA~ON AND S~IAL NO. ADL 17595 IF INDIA],~. ALOTTEE O1~ TRIBE NAME 8. L~.'IT F?~RAI OR LEASE HAWSE MGS State 17595 9 WELL NO 4 I0 FIELD A_ND POOL, OR WILDCAT Middle Ground Shoal 11. SEC., T.. R., 5I.. (BO~'TO~{ HO1.V. OBJECTnZE) Sec.31, T9N, R12W, S.M. 12, PER.MIT NO. 64-6 ,,, 13. REPORT TOTAL DEPTH AT F2qD OF MONTH. CHANGIgS IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLI/NIES USED, PERFORATIONS,/-F. STS A/ND I{ESULTS FISHING JOBS JI/NK IN HOLE AND SIDE-TI~ACKED HOLE A3¢D A.NY OT}IER SIGNIFICANT CIiA.NGF~ IAI HOL~ CONT)ITIONS. Summary of Operations During January 1974: No work was performed during January due to other higher priority well work. 14. I hereby ~ify that the foreg~true and eorrec% SmNm~ .~e~tD, k~,q-~. ~%~ ~- mT~ Area Superintendent ~ February 12, 1974 NOTE--Rep on this form t8 required for .each calendar ~nth% regardless of the status of operations, and must ~ filed 'in duplicate with the oil and gas conservation comm lffee b~ the I~ of the suoc~ding month, unle~ otherwise directed. Amoco Production Company P. O. Box 779 AnchOrage, Alaska 99510 January 21, 1974 File: WMJ-036-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Re: Monthly RePort of Drilling and Workover Operations MGS 17595 Well No. 4 Granite Point 17586 Well No. 3 Attached are State of Alaska Forms P-4 reporting workover operations on the above wells for the month of December 1973. District ~duction Superintendent Attachments JAr! o ,..', 1974 ~.~ .;.. STATE OI~ ^I. ASKA OIL AND OAS CONSERVATION CO/V~I~EE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS SUBMIT IN DUPLICATE AP! ~Lr~ERIC~L CODE 50-133-10070 LEASE DESIGNATION AND SglqlAL NO. ADL 17595 1. T IF INDIA~ AD'flEE OR* TRIBE NAME 01~ ['~ O,~, ~ 0T~Z~ W~LL W~LL NAME OF OPen, ATOll Amoco Production C, ompan¥ ......... ,kDI~'RESS OF 6P~ P, O, Box 779.~ Ancho.ra~.~ Alaska 99510 At surface: 1971' FNL, 591' FWL, Sec. 31, T9N, R12W, S.M., Caisson off Leg 2, MGS Platform Baker 8. L,~IT FAR~{ OH LEASE NAME MGS State 17595 4 1~'i' F~ AND POOL, OR WILDCAT Middle Ground Shoal II. SEC,, T., R., M.. [BOTTOM HOLE o~rmc-rn~ Sec. 31, T9N, R12W, S.M. 1~. P~LM IT 64-6 13. REPORT TOTAL DEPTH AT END OF MONTH. CHA.NGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEl'TH SET AND VOLI. rlVIES USED. PEP.2'OHATIONS, TESTS AND RESULTS FISHING OO]3~; JUNK IN HOLE AND SIDE-TRACKED HOLE A,N'D A~qY OTHER SIGNIFICANT ~GES IN HOL~ CO1WI)ITIONS. Summary _o.f Operations During December 1973: No work performed during December due to other higher priority well workovers. JAt 2 2 974 ...... ~ -~J~-, ,,~Dist' Production Supt. ~,~ ,,Janua~ 21, 1974 oil Qnd gas c~ot~n commiffte by the 16~ of the suec~ding mnt.~ltg Otherwile directed. Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 December 17, 1973 File: WMJ-667-WF Mr. Homer L. Burrell, Director Division .of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504~ Dear Sir: Re: Monthly Report of Drilling and Workover Operations MGS 17595 Well No. 4 I Attached is a State of Alaska Form P-4 for the subject well for the month of November 1973. Yours very truly, John C. Schillereff Supervisor in Charge Attachment F~ No. P.--4 REV. 3-1-70 STATE (~r ALASKA OIL AND GAS CONSERVATION COM~I'I-I'EE SUBMIT IN MONTHLY REPORT O'F DRILLING AND WORKOVER OPERATIONS 1. W~;LL ~. N~- OF O~R*TO~ Amoco Production Compan7 3. iDDRESS Or OP]~:~ATOR P. O. Box 779~ Anchorage, Alaska '~. ~OCA~ON OF W~UL 99510 At Surface: 1971' FNL, 591' FWL, Sec. 31, T9N, R12W, S.M., Caisson off Leg 2, MGS Platform Baker ~--API NUAIERICAL CODE 50-133-10070 LEASE DESIGNAT/ON AND $EIRIAL NO, ADL-17595 7 IF INDIAIq, ALOTTEIE OR TRIBE N~ME 8. L~.'IT FAitM OR LEASE NAME MGS State 17595 9 WELL NO 4 10 FIELD AND POOL. OR WILDCAT _Mid,dle Ground Shoal SEC., Z., Sec. 31, T9N, R12W, S.M. 12. PEP. MIT NO 64-6 13. REPORT TOTAL DEPTH AT END OF MObil'H, CHANGES IN HOLE SIZE. CASING AND CE1VIENTING JOBS INCLUDIXG DEPTH SET AND VOLUMES USED, PERFORATIONS. T~STS A1W~D RESULTS FISHING JOBS JIfNK I1~ HOLE A-ND SIDE-TR~,CKED HOLE ;~ND ANY OT~rF-R SIGNIFICANT ~GES rN HOL~ CONDITIONS. Summary of. Operations. During. Novemberr 1973: No work performed during November. 'ANcHORAOE ' ........................ Supervisor in Charge D*m December 17~ 1973 Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 November 13, 1973 File: WMJ-602-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Re: Monthly Report of Drilling and Workover Operations MGS 17595 Well No. 4 Attached is State of Alaska Form P-4 for the subject well for the month of October 1973. Yo.ur~s very t~uls[, ,. Dlstr~ct' ' ~Tr duction Superintendent At t achmen t NOV ! 5 1973 ~m .o. ~'--4 STATE Or' ALASKA ~,r, B- I-?0 SUBMIT II~ D-uTpLICAT~ OIL AND GAS CONSERVATION COMMII-I'EE MONTHLY REPORT OF ;DRILLING AND WORKOVER OPERATIONS Ap! ~UMEmCAL ~:'ODE 50-133-10070 LEASE DESIGNATION A. ND SERIAL NO. ADL 17595 WKLL W,LL 99510 ~,~..~z or oP~.z'o~ Amoco Product£on Company .... ADDRESS OF OPEI~ATO~ P. O. Box 779, Anchorase~ Al. aska '4. Ld~A~ON OF %VFJ..,L At surface: 1971' FNL, 591' FWL, Sec. 31, T9N, R12W, S.M., caisson off Leg 2, MGS Platform Baker 8. L~IT FA1RA{ OR LEASE NA/~E MGS State 17595 g WELL NO 4 "10. F~ A-~D POOL. OH WILDCAT Middle Ground Shoal 11. SEC., T., R., M.. (BoTToM HOLE om,rmc.nv~ Sec. 31, T9N, R12W, S.M. 1~-, PERMIT NO. 64-6 13. REPORT TOTAL DEPTH AT END OF MONTH, CHA. NGF~ IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDING DEPTH SET A/W'D VOLU%VI]~ USED, PEB. FO~TIONS. TESTS AND RESULTS FISHING JOBS JITNK IN HOLE AlqD SlDE~TR~CKED HOLE AND A. NY O'I'I-IEl:t SIGNIFICAAIT CItANGI~ IN HOL~ CONDITIONS. Summary.. of,. Operations~ During. October. 1973: No work performed during October. NOV ! 5 1973 No. · - 1-70 STATE gr ALASKA OIL AND GAS CONSERVATION CON~I'i-rEE SUBMIT l~T DUPLICAT~ MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS [] °- _ 2. NAME OF OPEI%ATOR Amoco Production Company. 3. ADbRESS ~F' 0PEP~'I~R ..... P. O. Box 7.7.9, Anchorage, Alaska 99510 4. LOCATION OF At Surface: 1971' FNL, 591' FWL, Sec. 31, T9N, R12W, S M., Caisson off Leg 2, MGS Platform Baker $. APl NUA~ER/CAL CODE 50-133-10070 6 LEASE DESIGI~ATION AXD SERIAL NO. ADL-17595 ? IF INDIA)~, ALOTTEE OR TRIBE NAME 8. L~IT. F~ OR LEASE ..... MGS State 17595 9 WE~ NO 4 10. F~ ~ND P~L, OH WILDCAT ~.Middle Ground Shoal n. s~., T., R., M.. (~OM HO~ O~ Sec. 31, TgN, R12W, S.M. 12 P~IT - ,,, , 64-6 I3. REPORT ~0~AL D~H AT END OF MONTH, CHA~NGES IN HOLE SIZE. CASING AND C~-VIENTING JOBS INCLUDING DEPTH SET ~ VOLUMI~ USED, PI/IRFORATIONS, TESTS ANT) RESULTS FISHING JOBS JLrNK IN HOLE AND SIDE-TR~CKED HOLE A~D A.NY OTI-IER SIGNIFICANT CHANi~I~ IN HOL~ CONDITIONS. Summary of Operations During .September 1973: Workover delayed due to'platform skid rail modifications to facilitate moving workover rig over well. No work performed during September. OCT Is';".-, i/ oil and go~ co~ervation commiflee by the 15~ of the suQc~ding ~n~, ~le~ otherwise directed. Amoco Production Company P. O. Box 779 ' Anchorage, Alaska 99510 September 24, 1973 File: WMJ-507-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Re: Monthly Report of Drilling and Workover Operations MGS 17595 Well No. 4 SMGS Unit Well No. 11 SMGS Unit Well No. 12 REV I I ~)~AFT I _ ...... ! $~c I CONFER: FILE: - . : LI _ LL Attached are State of Alaska Forms P-4 reporting workover operations on the above wells for the month of August 1973. Yol s ve , District gro~uction Superintendent Attachments DIV[,310N ¢/...;F OIL AND GAS ANCHORAGE Form No, P--4 REV. $- I-?0 STATE Ot- ALASKA SUBMIT IN DUPLICATE OIL AND GAS CONSERVATION COMMI'I-i'EE MONTHLY RE!PORT OF DRILLING AND WORKOVER OPERATIONS API NUMERICAL ~2ODE 50-133-10070 6 LEASE DESIGNATION AND SERIAL NO. ADL-17595 1. ? IF INDIA~, ALOTTEE OR TRIBE NAME 0IL [~ O&S 0 WgLL W~LL OTHER ,. NAME OF OPERATOR Amoco Production Company 3. ADDRESS OF P. O. Box 779~ Anchorage~ Alaska 4. LOCATION OF WELL 99510 At Surface: 1971' FNL, 591' FWL, Sec. 31, T9N, R12W, S.M., Caisson off Leg 2, MGS Platform Baker 8. L.~IT. FA3LM OR LEASE NAME MGS State 17595 g WELL NO 10. FIELD A_ND POOL. OR WILDCAT Middle Ground Shoal 11. S'mC., T., R., M.. CROCI'TOM H.O~E OBJF, C'Trv'~ Sec. 31, T9N, R12W, S.M. 1~-. PERMIT NO. 64-6 13. REPORT TOTAL DEPTH AT END OF MONTH, CHA~NGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET A/WD VOLU1ViES USED, PERFOHATIONS. TESTS AND HESULTS FISHING JOBS JUNK Ii~ HOLE AND SIDE-TRACKED HOLE A~D A~TY OTHER SIGNIFICANT CI-IAN~ IN HOLI~ CONDITIONS. Summary.of Operations During. August 1973: Workover delayed due to platform skid rail modifications to facilitate moving workover rig over well. No work performed on well during August. DIVi:$1ON OF OIL AND GA~ ANCHORAGE 14. I hereby ce ,SmNXD ~/t._z-,' ~' ,~/ ~r~ Dist. Production Supt. ~AT~ ,September 24~ 1973 NOTE--Re.or, on thi~/~or'~~d.~Leech colendor mo. th, regerdles, of tl~e $,o,u$ of operotion,, end .us, I~ flied in duplice,, wit, the '~ oil and goo ~fonser,~clt~on commiftee bythe 15th of the succeeding month, unless otherwise directed. F~rm ~To. P.--4 ~EV, 3-1-70 STATE C,, ALASKA OIL AND GAS CONSERVATION COMMII-I'EE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS ,. NAME OF OPERATOR Amoco Production Company 3. ADDRESS oF oPnutro~ P. 0. Box 779, Anchora~e~ ALaska '4. LOCATiON OF W~ ' Surface: 1971' FNL, 591' F~rL, Sec. 3~, TgN, ~2~, S.H., Caisson offf Le~ 2, HGS P~a~ffo~ Baker SUBMIT IN DUPLICATE AP1 NLrMERICAL CODE 50-133-10070 LEASE DESIGNATION AND SEHIAL NO. ADL-17595 ~ IF INDIA]~, ALOTTEE OR TRIBE NAME 8. L,~IT FARM OR LEASE NAME MGS State 17595 g WELL NO 10. F~ AND POOL, OR WILDCAT .Middle Ground Shoal I1. SF, C, T.. R., M.. ('BO'I'TOM 99510 Sec. 31, T9N, R12W, S.M. 12. PEP~MIT N'O. 64-6 13. REPORT TOTAL DEPTH AT END OF MONTH, CHA.NGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLU1VIES USED. PERFOI:[ATIONS. TESTS ANT) RESULTS FISHING JOBS JLrNK L~T HOLE AND SIDE-TRACKED HOLE A.N'D A~TY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. S~mmary.of. Operations,During July,1973: No work performed during July; currently plan to commence this workover after completion of injection well work On SMGS Platform Dillon. DPv'iSICN ;:2. F 0!!, ,~.t'-ID OAS , ,Sm~~T~ District Production Supt.mA~ August 22, 1973 oil and/tlas/rdonservot/on oommiffse by the 15th of the suoceeding month, unle~8 otherwise directed. July 23, 19 73 File: WMJ-396-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Amoco Production Company P. O. Box 779· Anchorage, Alaska 99510 I-%? Re: Monthly Report of Drilling and Workover Operations MGS 17595 Well No. 4 MGS 17595 Well No. 6 SMGS Unit Well No. 11 SMGS Unit Well No. 12 · Attached are State of Alaska Forms P-4 repOrting workover operations on the'aboVe Wells for the·month'Of June 1973. Yours very truly, Supervisor in Charge Attachments DIV{SION OF OIL AND OAS ANCHORAGE STATE Of. ALASKA OIL AND GAS CONSERVATION COMMITTEE SUBMFT IN DUPLICAT~ MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS ~. ~z or O~ZR~TO~ Amoco Production Company 3. ADDRESS OF OPerATOR P.O. Box 779, /~chora~;e~ Alaska 4. LOCATION OF WELL 99510 Surface: 1971' FNL, 591' FWL, Section 31, T9N, R12W, S.M. Caisson off Leg 2 ~ ApI NU'NiERICAL CODE 50-133-10070 LEASE DESIGI~ATION AND S~RIAL NO. ADL-17595 '7 IF INDIA)~, ALOT l'kE OR TRIBE NAME 8. L.~IT FARA~ OR LEASE NAME MGS State 17595 WELL NO 4 10 FIELD AND POOL. OR WILDCAT Middle Ground Shoal 11 SEC** T., R., M.. (BOTTOM HOI~E om,rmcrm~ Sec. 31, T9N, R12W, S.M. 1~-. PERMIT NO, 64-6 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEME~'riNG JOBS INCLUDING DEPTH SET AiNq) VOLI/MES USED. PEB.FOHATIONS, TESTS A1N'D RESULTS FISHING JOB~ JI~'/~IK IN HOLE AND SIDE-/RACKED HOLE AND ANY OTHER SIGNIFICANT ~GES IN HOLE CONDITIONS. Summary, of. Ope.F..a.t.ions During. June. 1973:. No work performed during June, delayed to coordinate with other workovers scheduled at MGS Platform Baker. We now anticipate this work will commence in August. DtVtSlON OF Oft AND OAS ANcHORAgE 14. I hereb~4~ertify tlmt the foretoin~ is ~'ue and correct SmN~O~Z~...~~I]P'~ ~.m Supervisor in ~arge m.~ July 23, 1973 N~E --Report on this form is requlre~or .each calendar ~nth~ regardless of the status of operations, and must ~ filed in dupli~te with the oil and gas conservatbn commiffee bythe 15~ of the suecNding mn~, ~le~ otherwise directed. June 14, 1973 File: WMJ-329.WF Amoco Production Compan P. O. Box 779 Anchorage, Alaska 99511 · lc. C. ENG ~ 1 ENG 4 ENG ...,~-E NG -- ___ 1 GEOL ~ 2' r- '-' G,..OL 3 G~OL R~V DRAFT ..... "S'EC CONFER: FILE: -- Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 . Dear Sir: Re:. j~nthlY Report of Drilling and Workover Operations ~'MGS 17595 Well No. 4 MGS 17595 Well No. 6 SMGS Unit Well No. 11 Attached are State of AlaSka Forms P-4 reporting workover operations on the subject wells for the month of May 1973. Yours very truly, W. M. Jones District Production SUperintendent Attachments ,STATE OF ALASKA SUBMIT IN DLrPLICATE OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 0IL ~ GAB WELL ~'~LL NAME OF OPERATOR Amoco Production Company i' XOD~WSs 'OF"0~_-'jaWoa ................ P. O. Box 779, Anchorage, Alaska i LOCA~O~ OF w~;-~ Surface: 99510 1971' FNL, 591' FWL, Sec. 31, TDN, R12W, S.M., Caisson off Leg 2, MGS Platform Baker APl NI~{ERICAL CODE ....... · 50-133-10070 LEASE DESIO~ATION AND SERIAL NO. ADL-17595 } IF INDIAL~, AL, OTTEE OR TRIBE NAME 8. L.~IT FARM OR LEASE NAME ..MGS State 17595 9 WELL .N'O 4 Mid, die. Ground Shoal il. sec, r., ~., ~f.i iBO~rOM ~OtX O~ Sec...3.1., T9N, R12W., S.M. 12 PEi~VIIT NO. 64-6 13. REPORT TOTA~ DE~H A~ END' ~F MON~, C~NG~ iN H~LE SIZE, CASING A~ C~NG JOBS INCLUDING DEP~ s~ ~ voL~ us~. ~o~o~s. ~s ~ ~s~s ns~mo JO~ ~ ~ ~o~ ~D S~D~-~C~D Summary'.9.f'ORerations Durin.~.:May.1973:. No work performed during May; delayed to coordinate with other workovers planned at MGS Platform Baker. JUN DlVlStc, i'4 ~.t:: OIL ANCHOKAO~ s~~ }f ,, ~~ . ~ District Prod. Su t ~.~ June,,~., 1973 ........... // .~ -- ~ . __ ~ May 1, 1973 File: WMJ-236-WF Amoco Production coml~aln~ Anchorage, Alaska Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Re: Sundry Notice of Intent Water Injection Conversion of Middle Ground Shoal 17595 Well No. 4 Attached is State of Alaska Form 10-403 reporting our intent to convert the subject well from producing to water injection. The conversion was authorized by Division of Oil and Gas Administrative Approval No. 44-13 dated March 21, 1973. The conversion work is expected to begin on May 5, 19 73. Dis t riC~[ ?r~ducti on Superintendent Attachment < 'F~rJ I0-403 ~REV. I- I0-~5 S~brnit "Intentions" in Tr4plicate & ,'SuSsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WILLS (Do not use this form for proposals to drill or to deepen use "APP-LICATION 'FOR/~'ER~V~iT:-' 'for such'p~o~osals.) . . . OIL GA. [] WELL WELL OTHER 2. NAME OF OPERATOR ~_~_co Production G~m~7' 3. ADDRESS OF OPERATOR P. O. Box 779, ~olage, ~~ 99510 t.~oc.~o~ o~ ~ ~t~.-~c. 1971' ~L, 5~1' ~, Saa. 31, TgN, ~2W, S'M. Cais~ off ~g 2 13. ELEVATIONS (Show whether DF, RT, GR, etc. PJ~ 75' abo~ MSL 14. Clmck Apgroprinte Box To I~nd~ N~t'um ~ N~ti'ce, Re 5. AP1 NI/MY_A~CAL CODE 0-!33-z0070 6. LF_,ASE DESIGNATION A-ND SERIAL NO. 7. IF INDIA-N, ALLO'i-r=E OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME 9. WELL NO. 10. FLELD A/~D POOL, OR WILDCAT ~itddle Ground Shoal 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 31, TgN, R12~, S.H. t2. PEP,2/HT ~O. 6/,-6 tort, or Other Dnta ' NOTICE OF INTENTION TO: TEST WATER aHUT-OFF PULL OR ALTER CA~INO FRACTURE TREAT MULTIPLE COMPI,ETE 8HOOT OR ACXDIZE ABANDON' REPAIR WELL CHANGE PLANS ,__ SUBSEQUENT REPORT OF: WATER SHUT-OFF J ] REPAIRINO WELL FRACTURE 'TREATMENT --I ALTERING CASING SHooTiNG OR ACIDIZING ~ ABANDONMENT* (Other) (.NOTE: Report results of multiple completion on Well ~Other) Co~'~V//~'~ ~O %~1~. ~l~//J~t~/~ Completion or Reeompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OP~RATIONI~ (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. Wa propoae to convert thin "A-EFG" none producing w~ll =o ~ "FO" ~ n injection traZive Approval iio. 44-13 dated ~a'r~ Zl,. 1973. ~ plan for the conva~ton work ~o: 1) ~ill ~ha well amd p~l ~he ~=tug d~ole ~qut~ment~ 2) Clean out to P~TD 4) Test for co~untcatiou between the *'~' f~e (6a10-6823') ~a th~ "F" zone (7080-71~') ~th packer ~ b~ldge plus and c~t ~q~eze a~ req~red for zone itolation~ 5) ~ment ~ follows at /JSPF: 7240-72~0', 7~5-7175', 7375-7460', 7475-7520' , 7500-7570', 8035' , ~170-~1~0~, ~105-8~60~, ~-~9~~ , 098~-8995' , 9010-90~' , ~d 9050-9120' ~d p~ing f~.Ce~d inlet waCe~ aC ~eur~ up to 3500 palg; 8) SeC a pa.~nent packer az 6a~'~ 9) Run a single ~-~ string; 10) Put well on ~ater injection. c 16. X hereb7 certify t~at. the feor~l[oJnl ~tl...~ue and correct OHgina, ~ uy Dist. Production Supt. SIGNED ~. x~ ~nXT~O TITLE (This space for State ~ce,~e) APPROVED BY ..... CONDITION8 OF APPROVAL, IF l~y I, 1973 DATE DATE ~"-~ ~"'"' 7 3 InStructions On Reverse Side Approv~ Cop~ · Returned February 6, 1973 File: WMJ-061-WF Mr. Homer L. BUrrell, Director DiViSion of Oil and Gas · Department of Natural Resources State~ of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 . Dear Sir: Re: Semi-annual Production Tests Middle Ground Shoal 17595 Wells Nos.~.4 and 7 Amoco Production Company P. O. Box 779, Anchorage, Alaska FEB 7 @73 DIV~lgt~ .:~,..~': OIL AN.D GAS ANCHORAG~ 99510 In accordance with Conservation Order No. 99 dated March 15, 1971, we are furnishing commingled production test and spinner survey data for MGS 17595 Wells Nos. 4 and 7. On December 9, 1972 a spinner survey was performed on MGS 17595 Well No. 4 ("A"-"EFG" pools commingled). Well production during that survey waS 493 BOPD, 2 BWPD, 383 MCFD, with a 50 psig flowing wellhead pressure and 15 psig test separator pressure. On December 30, 1972 Well No. 4 was placed on gas lift and on a 24-hour production test the commingled "A" and "EFG" zones produced 396 BOPD, 11 BWPD, and 425 MCFD through a 124/64 in. choke at 100 psig. The' API crude oil gravity was 38.2° at 60° F. Production allocation by zones based on the December 30, 1972 production test and the December 9, 1972 spinner survey is: "A" zone 258 BOPD 11 BWPD 387 MCFD "EFG" zone 138 BOPD 0 BWPD 38 MCFD Special production tests commenced on Well No. 7 January 4, 1973. A spinner survey of the long string for "A" and "EFG" zone production on commn~ fr~_~t_h~ ...... F.~F~ ...... January 4, 1973 indicated, no~roduction is ' ' " " In addition, this survey also indicated additional fluid was entering the tubing above the top packer. In view of this, a tubing stop was set in the long string above the "A" and "EFG" zones and a spinner survey of the "BCD" zone production from the short tubing string was performed. This survey also showed that additional fluid was entering the tubing above the top packer. ThiS cross-flow condition allows production from the "A" and "BCD" zones to commingle. - 2- Some time ago after mechanical problems were experienced in Well No. 7 while placing gas lift valves or dummies' in gas lift mandrels,'we became suspicious that a cross-flow between tubing strings could possibly be occurring. Also, we believe there is the' possibility that there is a leak around the top packer. During January 1973 we also attempted to obtain a "BCD" zone bottom hole pressure, but encountered wireline problems and could not complete the Survey. The spinner survey performed on the "BCD" zone tubing indicates the "A" zone is producing 72 perCent of the total fluid and the "BCD" zone 28 percent of the fluid. On a 24-hour production test on January 8, 1973, the combined "A" and "BCD" zone production waS 606 BOPD, 741 BWPD, and 510 MCFD thrOugh a 64/64 in. choke at 265 psig, with water cuts by zones unknown, We are presently preparing plans for repair of Well No. 7 for review by other working interest owners. Repair of Well No. 7 will commence as soon as possible after a satisfactory procedUre is agreed upon by all interested parties'. Inasmuch as the spinner survey performed January 4, 1973. and the previous semi-annual survey May 30, 1972 both indicated the "EFG" zone is not pro- ducing, we can conclude that we are presently producing only the "A" and "BCD" zones commingled. Administrative Decision 44.9 dated December 2, 1969 granted approval to commingle Production from the' "A" zone in Middle Ground Shoal 17595.Well No. 7 with product~ion from the' "BCD" zone or the "EFG" zone in accordance with Rule 6 of Conservation Order No. 44J. We assume it will be'. satisfactory to produce the "A" and "BCD" zones com- mingled in Well No. 7 in accordance with Administrative Decision 44.9 until repairs can be commenced. Yours very truly, W. M. Johes District Production Superintendent cc: H. T. Hunter November 28, 1972 File: WMJ-646-WF Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Re~/~S~mi-Annual Production ~ ( Middle Ground Shoalzi~95 We~ls Nos. 4 and 7 Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 2 GEOL ~ ~. -~V ..... ' c .... :'1 In accordance with Conservation Order No. 99 dated March 15, 1971, we are required to submit commingled production test data every six months on the referenced wells. The next scheduled testing is due during November 1972. We are presently conducting a special data collection program on Wells Nos. 4 and 7 which includes provisions for commingled production testing. The data collection procedures are complex and time consuming; consequently, the' final results will not be available until about' mid- December 1972.. We will furnish the necessary commingled test data as soon as possible after the conclusion of the data collection program. Dis tric~uction Superintendent Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: P. O. Box 779 Anchorage, Alaska NovemberlO, 1971 99510 File: JCS-598-WF Re: Semi-Annual Production Te, . Middle Ground Shoal 17595 Wells Nos. 4 and 7 ' / · I 4 ENG I -I ! G~EOL- EOt REV DRAFT SEC CONFER: TILE, DIVI~[OI'~ OF OiL AND ANCHORAGE Conservation Order 99, March 15, 1971, granted us permission to run spinner surveys on the "~' and "EFG" oil pool commingled MGS Wells Nos. 4 and 7 to fulfill the semi-annual production test requirements for these multi-completed wells. Your letter of July 13,' 1971 granted us permission to delay taking the spinner surveys in both wells due to a faulty workover rig on Platform Baker. On September 28, 1971 a 12-hour "A-EFG" connningled test was obtained on MGS Well No. 4, at which time the well produced 616 BOPD, 14 BWPD, and 788.MCFD through a 124/64" choke at 125. psig. The API'gravity of the combined crude .stream was 38.0 at 60°'F. On September 30,.1971 a spinner survey was~ performed on MGS Well No. 4. The results of the spinner survey were then applied to the "A-EFG" commingled test data given above to establish the production from each pool as follows: "A" zone - 462 BOPD, 14 BWPD, 734' MCFD "EFG" zone - 154 BOPD, 0 BWPD, 54 MCFD ;A 24-hour production test was obtained on the "A-EFG" commingled production om Well No. 7 on September 15, 1971-, at which time the well produced 247 BOPD, 7 BWPD, and 500MCFD.thr°ugh a 107/64" choke at a tubing pressure of. 160 psig, . On October 1, 1971 a spinner survey was performed on Well No. 7 to establish the individual "A" zone andthe "EFG" zone producing rates. The spinner survey showed that the "A" zone is producing all of the fluid and that the "EFG" zone is not producing any fluid at present. We are currently attempting to restore pro- duction from the'"EFG" zone by.means of a change in gas .lift valves. _ ~ ' ' Yours very truly, -C. Schillereff Supervisor in Charge Amoco Production Company P. O. Box 779 Anchorage, Alaska 99501 July 8, 1971 JCS-368-WF Semi-Annual Production Tests Middle Ground Shoal 17595 Well No's. 4 and 7 Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: COnservation Order 99, March 15, 1971, granted permission to run spinner surveys on the "A", "E", "F", and "G" oil pool commingled MGS Well No's. 4 and 7 to fulfill the semi-annual production test requirements for these multi-completed wells. Previously, we had performed the semi-annual produc- tion tests, required by Conservation Orders 44 and 89, by setting a plug in the commingled production string to shut in the "E", "F", and "G" oil pools while testing the "A" oil pool, and then removing the plug to test the com- mingled "A", "E", "F", and "G" pools. However, testing the wells with plugs had become difficult due to plug setting and retrieval problems which created a risk of permanent damage to the wells. We have, however, in the recent past, experienced mechanical problems with the workover rig on MGS Platform Baker. Therefore, we have been reluc- tant to perform the required semi-annual spinner survey production tests on MGS 17595 Well No's. 4 and 7~due to the risk involved. With the present faulty rig we would not be able to pull or repair either well if problems did develop during the spinner surveys. Thus a considerable amount of down- time and deferred production could result. A replacement workover rig for MGS Platform Baker has been purchased and is currently being checked out and prepared for shipment to Alaska. We are making every effort to expedite the installation of this replacement rig' and anticipate having it operational in about 90 days. In the meantime, to avoid possible extensive and costly downtime and deferred production, we respectfully request that we be allowed to delay - 2- taking the required semi-annual spinner survey production tests on MGS 17595 Well No's. 4 and 7 until the replacement rig is operational. Yours very truly, C Schillereff Supervisor- In-Charge cc: W. M. Jones PAN AMERICAN PETROLEUM CORpoRATION P. O. Box 779 Anchorage, Alaska April 9, 1970 99501 oKG KLV ~ HW~ / ~1<,. . FILE ~ File: Re: FKK-249-WF Production Test - Middle Ground Shoal 17595 Well No. 4 Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: In compliance with Part (b)of Conservation Order No. 89, dated April 6, 1970, we are submitting an "A-EFG" commingled production test after the dual flow choke was removed from the subject well. ,. On March 12, 1970, a commingled production test was obtained. During the 24-hour test, the well produced 806 barrels of oil, 0 barrels o£ water, and 2473 MCF of gas. The well was flowing through a 124/64" surface choke at 190 psig. The observed API gravity of the crude was 38, 8° at 60°F. The required production test information prior to removing the dual flow choke was transmitted to you in our letter of February 9, 1970, File: FKK-108-WF. Yours very truly, F. K. Krebill Are a Superintendent RECEIVED Dt,..,~$~,ON OF OiL AND ,'SAS ANCHORAO~ // mCA Conpo PANAME PETROLEUM ION P. O. Box 779 KLV ~ ~chorage, ~aska 99501 .HW~:;._ ~ February 9, 1970 REL FILE File: FKK- 108-WF Quarterly Pro'duction Tests - Middle Ground Shoal 17595 Well No. 4 _ _ ~ , L .......... t u ........ Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: In compliance with Conservation Order No. 62 dated March 27, 1968, Pan American Petroleum Corporation herewith submits well test information for the subject well. This test information is for the fourth quarter of 1969. A twenty-four hour production test of the Middle Ground Shoal "A" and "EFG" pools, commingled through the Otis dual flow choke-check valve, was obtained on December 8, 1969. The well produced 776 barrels of fluid with a trace of BS & W, flowing through a 124/64" surface choke at 150 psi tubing pressure. A total of 2673 MCFD of gas was produced during the test Period. The observed API gravity of the crude was 39.3° at 6O°F. On January 26, 1970, a 24-hour production test was obtained on the MGS "A" pool only. Total fluid recovery was 560 barrels per day with a trace BS & W. The surface tubing pressure was 140 psig with a surface choke setting of 124/64". Total gas produced was 2557 MCFD during the test, and the observed API gravity of the crude was 40.1° at 60°F. The delay between obtaining the commingled test and the separate "A" pool test resulted from scaling problems around the dual flow choke. i o 1970 DIVI$10N OF O1£ AND 0~S Mr. Homer L. Bu~¢ell - 2 - Feb~aary 9, 1970 Techniques required to pull the choke were quite time consuming and had to be coordinated with other platform production operations in progress at that time. Yours very truly, F. K. Krebill Ar'ea Superintendent cc: Mr. W. M. Jones- Denver "..'~ ~!'~ i o 1970 I~IVI$10N OF OIL AND ~ AI~¢HOi~G~ P. O. Box 779 Anchorage, Alaska 99501 October 2, 1969 PANAMERICAN PETROLEUM CORPOP. ATION File: OKG KW HWK REL FKK-656~WF Production Tests - FILE Middle Ground Shoal 17595 Well No. 4 Re: Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: In accordance with requirements of Conservation Order No, 62~ dated March 27, 1968, Pan American Petroleum Corporation hereby submits the following well test information for Middle Ground Shoal 17595 Well No. 4, for the third quarter: Twenty-four hour test of MGS "A" Pool, conducted on September 18, 1969, recovered 537 barrels of fluid, with a trace of BS & W, flowing on 124/64 choke with Z10 psi surface tubing pressure, API gravity of the produced fluid was 41, Z° at 60°F. Gas production was 3Z 17 MCFD. Twenty-four hour test of MGS "A" Pool and MGS "EFG" Pool commingled, through an Otis dual flow choke check valve assembly, conducted on September Z5, 1969, recovered 780 barrels of fluid, with a trace of BS & W, flowing on 124/64 choke, with 150 psi surface tubing pressure, API gravity of the produced fluid was 39, 6° at 60°F. Gas production was g9Zl MCFD. ~ Yours very truly, Area Superintendent Attachments DATE: Me ter ' BBLS. Time ~ ,'-,/!1 ~ ,' · ,,jil/!j. · /, o-r, '-~ " - Sepr. TPF. Pres s Ch. BS&W .? > Remarks - / Time Meter BBLS 7r /l . · Temp._ Ch. BSU~ Remarks ? ./? ~s /0 , /2_ j · Sepr. TPF. Press -VD C i_£L' ..... Z;/i? 0 J ~,~ ~--/ ~ / '~ TEMP _ _ OO ,/ ecisio"n harts ROSS-M, ARTIN CO. ~ TULSA 74-10I METER ~ [TUBE& ORiF.SIZE Ti[','iE PUT OH ~It L ~- DATE TAKEN OFF SIG~ PA A mCA PETI OLEUM COI POP. ATIO 99501 File: FKK-480-WF P. O. Box 779 Anchorage, Alaska June 24, 1969 -- Re- Production Tests - Middle Ground Shoal 17595 Well No. 4 Mr. Homer L. Burrell, Director Division of Oil & Gas Alaska Department of Natural Resources 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir- Pursuant to the requirements of Conservation Order No. 62, dated March 27, 1968, Pan American Petroleum Corporation hereby submits the following well test information for Middle Ground Shoal 17595 Well No. 4, for the second quarter' Twenty-four hour test of MGS A Pool, conducted on June 14, 1969, recovered 460 barrels of fluid, with a trace of BS & W, flowing on 124164 choke with 240 psi surface pressure. AP1 gravity of the ~9: produced fluid was 40.9° at 60°F. Gas production was 4091 MCFD ............. Twenty-four hour test of MGS A Pool and MGS EFG Pool commingled through an Otis dual flow choke check valve assembly, conducted on June 17, 1969, recovered 781~.j~rels of fluid, with a trace of BS & W, flowing on 124/64 choke with 240 psi surface tubing pressure. API gravity of the produced fluid was 39.7° at 60°F. Gas production was 3863 MCFD. The EFG zone completion will not flow by itself. The gas which would be required to lift this zone is not available because of limited compressor capacity. It is, therefore, essential that the two zones be commingled through the downhole check valve assembly in order to obtain the 300 BOPD of EFG zone production. Yours very truly, Area Superintendent Attachmen ts i DATE: NAME OF WELL: A)~,~_~f /7/ e._ ... 3f · Sept. Time Me ter BBLs. TPF. Pre s s Temp. Ch. BS&W Remarks DATE: BBLS. TPF. Time Meter ;.// /0 ?.2 .to ./ 17 ./_.__7 /? ,2_.o /7 /? NAME OF WELL: ~/_~~ ~/~ Sept .' Pre s s Ch. BS&W Temp. _ ~C?. . 7',r,,( e ~' [ I I I Remarks METER CO CHARTS PLATE .'fax . , F~ORM ~70 2-57 P. O. Box 7?9 Anchorage, Alaska April 14, i969 PANAMERICAN PETROLEUM COILOOOATION HLB ~ 99501 'i'u~ ~ OKG ~ KLV,---~-~--- File: FKK-314-WF Re: Production Tests Middle Gr®und Sheal 17595 Well No. 4 Mr. Homer L. Burrell, Director Division of Oil and Gas Alaska Department of Natural Resources 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Pursuant to the requirements of Conservation Order No. 62, dated March 27, 1968,· Pan American Petroleum Corporation hereby submits the following well test information for Middle Ground Shoal 17595 Well No. 4 for the first quarter: Twenty-four hour test of MGS A Pool, conducted on March 24, I969, recovered 740 barrels of fluid, with a trace of BS & W, flowing on 124/64 choke with 225 psi surface tubing pressure. API gravity of produced fluid 40° at 60°F. Gas production 4690 MCFD. Twenty-four hour test of MGS A Pool and MGS EFG Pool commingled through Otis dual flow choke check valve assembly, conducted on March 26, 1969, recovered 1034 barrels of fluid, with a trace of BS & W, flowing on 1Z4/64 choke with 240 psi surface tubing pressure. API gravity of produced fluid 39.0° at 60°F. Gas production 4zi?0 I~ICFD. The EFG zone completion will not flow by itself. The gas which would be necessary to lift this zone is not available because of limited 1 A 1 )69 ~lo~ o~: o,. ,~ ~,~. Homer L. Burr~_41 - Z - ~ril i4, I969 compressor capacity. It is, therefore, essential that the two zones be commingled through the downhole check valve assembly in order to obtain the 300 BOPD EFG zone production. Yours very truly, F. K. Krebill Area Superintendent Attachments- Well Test Data APR 1 ~ I'96~J DATE: Sepr. · Time Meter BBLS TPF. Press Temp, Ch. BS&W' RemJrk~ C:~o ~ ~ .... "' ....... · 7,'oo....-:' ?/ I. 7 ...... . . . ...... ,, , ......... ,:o-~.1...~c.~~' ~.x--'..1_ .~. I ' ~ ........ ~. __ ' ' /~:0,~ 307"'1' 'Yz ,I . _ ¢ _ _ -..'-.._ ~oo__.~-r~-I ¢~ .1_.' '.,-' _._ .I . .. _ ', '¢n."-¢v' I' '":' ,57:ol.7~- · t " ~1 '~ //.~, FrO_ ¢3 I ........ ! .. " ' ~ ~ . " ,, - ...... _ :_ ':~ L.::: _-[ ............. : ....... :_ ._ 1 ,-,.._. '_.. :. :: ~:_~o ?~.,L_~¢".: · -._., · ~ ~..' .... J~:~' t.~ :¢ ': ~'¢~/--~:_ i ............ L-____-_-_'-. L... ,,,,~ I ' - I ...-'"' ~"'-._ "'1-'" '."- -I. NAME OF WELL: ...... e. Sepr. .' BBLS TPF Press Temp. Ch. BS&W Remarks · . 9_..a~' '~._o ., 3.0.,.' , .... . ......... 9-~° . ~-,~.~ .... l s.i " . ....... '" -- -/z ~'_ .. ~ ,/ ' I · .. :~. ,~: . ' ;' ,, ,~ t/~ I-"~',". /~ , , . .... ~-~'1.~ I ' ~.~ ,'i,_. :' '1" ' .,, . ............ _ · , ~JOl 3 g..33.: ........ x~._!'~;~"".'z~''. I · , ...... - ~~.' ~~'t ~7"1 .... "'". , ~>j~ ~-~? ~' ~,~:_, ,, -'~ ~3, o~- ,~ ~ ...... ~~! ~'[,.~~ ..... -: t .... .......... ...., . ' ~~,! ~~ I~ __.., -_]LT~.' "I .... " ~a~ L~~.. ~z ,. I ~_. I." . .... . ~~'- ....... _ ~ I~ ' - ...... ARCCO RECORDING CHARTS j~; / ~ --' ~, ,.... ' METER ,~~ /~ ......,. -- ON "~' '-/' /? ~ ' M I~ OFF '''-; '" J ~'' '~ ' M - ,. ; I REMARKS LiA.IVI. ,12 IVOoN RECORDING CHABTS // '?/: / A.M. i FORM ~.70 2.57 PAN AMERICAN PETROLEUM CORPORATION P. O. Box 779 Anchorage, Alaska 99501 January 30, 1969 File: FKK-98~WF Re: Dual Flow Choke Tests Middle Ground Shoal 17595 Well No. 4 ~ Middle Ground Shoal Field Mr. Homer L. Burrell, Director Division of Oil and Gas State of Alaska Department of Natural Resources 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: DIVISION OF C,~L AoiD GA3 A,~( 2i' Zi. Pursuant to the requirements of Conservation Order No. 62, dated March 27, 1968, Pan American Petroleum Corporation hereby submits the following well test information for Middle Ground Shoal 17595 Well No. 4: Twenty-four hour test of MGS A Pool, conducted on November 3, 1968, recovered 1015 barrels of fluid, with a trace of BS & W, flowing on i24/64 choke with 270 psi surface tubing, pressure. API gravity of produced fluid 40° at 60°F. Gas production 465O MCFD. Twenty-four hour test of MGS A Pool and MGS EFG Pool commingled through Otis dual flow choke check valve assembly, conducted on November 5, 1968, recovered 1327 barrels of fluid, with a trace of BS & W, flowing on 124~64 choke with 270 psi surface tubing pressure. API gravity of produced fluid 38.9° at 60°F. Gas production 4800 MCFD. Attempts to obtain the required individual zone test of the EFG Pool completion interval were unsuccessful. The EFG Pool completion could Mr. Homer L. Bu',. ¢11 _ January 30, 1969 not be made to produce without the assistance of flowing A zone production through the downhole check valve assembly. On the basis of the above tests, we now attribute about 300 BOPD production to the EFG Pool as a direct result of the Dual Flow Choke installation. Our gas lift compressor does not have sufficient capacity to provide lift gas for the EFG Pool in this well, and the lift provided by the A Pool gas is essential for continued production. Well test data will be submitted at quarterly intervals, hereafter. Yours very truly, F. K. Krebill Area Superintendent Attachments: Well Test Data DIVISION OF C;;. ,::',,;r.; GA. 3 'DATE- NAME Time 'Me ter BBLS. TPF. · Sept. P~'e s s Ch. _~ ....... TemD B S &W . .\ L_' / DIYI$1( '! ./ DATE: Time 'Meter TPF. BBLS. .1 I Sepr. Pre s s Tem~ Ch B S ~'l R e m a r k s · · t. _/ ~, ~;'-a~ ~..,~ RECORDING CHARTS l~ay 2~, 1968 FORM 470 P A P.,XCAN CO ON P. O. Box 779 Anchorage, Alaska 99501 May 21, 1968 ~:~ \5. RECEIVED File: FKK-643-986.511 MAY 2 1968 DIVISION OF MINES & MINERALB ANCHORAGE Re: Testing of Dual Flow Choke - Middle Ground Shoal 17595 Well No. 11 Mr. Thomas R. Marshal'i, Jr. State Petroleum Supervisor Division of Mines and Minerals 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Conservation Order No. 56, dated January 3, 1968, approved Pan Amer- ican's application for exception to the commingling provisions of Conservation Orders 44 and 53. A provision of this order required testing of Middle Ground Shoal State 17595 Well No. 11. A report on this testing was required within three months after the initial downhole commingling. Initially, the start of the testing was delayed due to the drilling of Well No. 14 from the same platform leg as Well No. 11. Following, the completion of Well No. 14, an attempt was made to begin the testing of this well. However, mechanical problems caused a further dela~ of'this testing. It became necessary to manufacture teflon coated O-rings for the downhole choke assembly to prevent gas from permeating the rubber O-rings which were initially provided with the assembly. The teflon O-rings have now been received; however, a further delay has been incurred due to the necessary recompletion of Middle Ground Shoal 17595 Well'~No. 14. Following the work' on Well No. 14, we plan to begin the testing'of the dual flow choke in Well No. 11. We anticipate beginning this work in the very near future'. The tests will be performed in accordance with Rule 1 (b) of conSer- vation Order No. 56, except for the required 24 hour flow test.of the B-C-D (intermediate) zone. This portion of the testing was waived by your letter of January 18, 1968. The intermediate zone is still dead, and we will be unable to conduct any production tests on this zone. Your letter of January 18, 1968, also requested information on contact made with Shell Oil Company on this matter. It is our understanding that the Mr. Thomas R. Marshall, Jr. May 21, 1.9.68 - Page 2 public hearing on this matter held December 21, 1968, and the subsequent hearing on commingling of Well No. 4 on March 14, 1968, constituted contact with Shell Oil Company on this subject. Please advise if this interpretation is incorrect. Yours very truly, F. K. Krebill Area Superintendent FORM 470 2-57 ..~, PANAMERIC PETROLEUM C01 PO ION P. O. Box 779 Anchorage, Alaska 99501 April 18, i968 File' FKK-495-WF Mr. T. R. Marshall, Jr. Division of Mines & Minerals Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Re: Packer Leakage Tests MGS 17595 Well No. 4 Please find attached data pertaining to the packer leakage tests which have been conducted on the above referenced well in the Middle Ground Shoal Field. The data is presented in graphical form rather than on the usual State form. This is because of the unusual completion technique used in this well. A pressure bomb was landed in a nipple below the lower packer, and then the lower zone was isolated by a plug in the tubing. This 'permitted an accurate monitor of pressures in the lower zone while conducting the test. A tabulation of bottom hole pressure is attached, and this information is also shown on the graphical pre sentation. You will also find attached the appropriate surface pressure charts for the test period, as well as a well bore sketch for your reference. This information is provided for your review and approval, in accordance with State regulations concerning packer leakage tests. .il: ::.- ! Attachments Yours very truly, F. K. Krebill Area Superintendent Shut- In Start Flow Shut-In Pump Diesel On Production PAN AMERICAN PETROLEUM CORPORATION PACKER LEAKAGE TEST March 12-14, 1968 MGS 17595 WELL NO. 4C K-2 4201 5050 PSI Hours Depth Deflection Pressure 1 7094 2 7094 3 7094 4 7O94 ~6 7094 8 7O94 10 7094 12 7094 13 7094 977 2450 984 2467 988 2478 991 2485 996 2498 997 2500 999 2505 999 2505 999 2505 1 7094 2 7094 4 7094 6 7O94 8 7094 10 7094 12 7094 999 2505 999 2505 .999 2505 .996 2498 .994 2493 .994 2493 .994 2493 1 7094' .994 2493 2 7094' .994 2493 3 7094' .994 2493 2 7094' .991 2485 4 7094' .989 2467 6 7094' .986 2472 8 7094' .981 2460 10 7094' .981 2460 i2 7094' .981 2460 FORM 470 2-57 . · MGS ~TATE 17595'WELL No. 4 Location:. . Surface-1971-'trNL, 591' F~VI,, Sec. 31, T9N, R1ZW SM At T. Do-1916'leNL, 932' FWL, Sec. 31, T9N, 1R12W SM Casing Program: 20" 94# csg set at 1003' 13 3/8" 54.5# csg set at 1987' 9 5/18'' 36, 40, 43.5# csg set at 7151' 7"' 23, 26,"29# csg set at 9215' 3 1/2" Single Item _ BY CX-1 CX-2 CX -3 'cx-4 CX-5 X PKR CXO CXO PKR KO KO o Strin_g._Dual Depth 314 1251 2346 3254 '4256 ' 5162 5261 5262 5360. 6613 6681 6683 7094 8.1'61 9108 Legend' BV - Otis Ball Valve Nipple CX - Otis Type CX Gas Lift Mandrel X - Otis Type X Seating Nipple PKR - Otis Type HR Hydraulic Packer - 3 1/2" X 7" (26-32# CXO-'- Otis Type CX Sliding Sleeve Q - Otis Type Q Seating-NipPle Form No. 1=--4- REV. 9-30-6'7 STATE O,F AI./~KA SUBMIT IN DEPLICATE OiL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT O:F DRILLING AND WORKOVE.R OPERATIONS ~. AP1 NUIiERICAL CODE None Assigned 6. LEASE DESIGNATION AND SERIAL NO. APL - 17595 , _ . 1. 7. IF INDIAN, ALOTTEE OR TRIBE NA.%IE OIL [] GAS [] WELL WELL OTHER 2. NAME OF OPEI%ATOR Pan American Petroleum CorporatiOn 3, .n'nRsss oF O~TOR P. O. Box 779 - Anchorage~ Alaska 4. LOCATION O,F W~ Leg 5, MGS Platform 'B'; 1971' FNL, 591' FWL, Section 31, T9N, R1ZW, S.M. 8. U-NIT, FAt~M OR LEASE N.~ME MGS State 17595 9. WELL NO. 4 10. FIELD AND POOL. OR WILDCAT Middle Ground Shoal 11. SEC., T., It., M., tBOT'POM HOI_.E OI~ECTIVE) Sec. 31, TgN, R12W, S.M. 12. PEI~IIT NO. 64-6 13. REPORT TJTAL DEPTI-I AT 'E_ND OF MONTH, CHANGES IN HOLE SI~E, CASING A~rl9 CEMENTING JOBS INCLUDING DEPTH SET A/kq~ VOLU/VIES USED, P~OI:L~TIONS, TESTS AND RESULTS, FISHING JOBS, JLrNK IN HOLE A/~D SIDE-T'RJ~CKED HOLE AND A_NY OTHER SIGNIFICAXqT ~GES IN HOL~ CONDITIONS. (Workover) 3/1-6 Flow tested 3/7 PBTD 9198'. Dual recompleted as flowing oil well. RECEIVED APR 16 1968 OIVISION OF MINES & MINERAL~ ANO'IOeAGE 14. I hereby certify t~t_~the . . . s~o~~ n~As s 't. Area Admin. Supvr.nA,,-~ 4/11 / 68 NOTE--Report on this form is ~ired for each calendar month, regardless of the status of operations, and must be filecl in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. Form No. P--4 REV. 9-30-6'7 STATE OF ALASKA SUBMIT I~ DEPLICATE AND GAS CONSERVATION CONU~I/IE5 MONTHLY REPORT OF 'DRILLING AND WORKOVER OPERATIONS WELL WELL OTHER 2. N~d~IE OF OPEiq~KTOR Pan Anat,,titan Petr01~,:m COrpor-tlnu 3. ADDR~.SS O~ O~TO~ P. 0. BOX 779 - ~h~a~: AI..~- qq~Ol 4. LOCA~ON O'F W~TJ- ~$ 5, MGS Platfo~ 'B'; i971' F~, 591' AP1 NUAIERICAL CODE None Assigned LEASE DESIGNATION AND SERIAL NO. ADL- 17595 7 IF INDIAN, ALO~I lEE OR TRIBE NA.%IE 8. UNIT,FAt:LM OR LEASE NAAIE M~S State 17595 9. %VELL NO. 10. FIELD A-ND POOL, OR WILDCAT Midgle Ground Shoal I1. SEC., T., R., M., (BOTTO,%ff HOLE OBJECTIVE ) Sec. 31, T9N, RZ2W, S.M. 1~.. PERAIIT NO. 64-6 13. ~EPORT TOTAL DEPTH AT END OF MONTH, CtiANGES IN HOLE SI~E, CASING AND CEMENTING JOBS INCLUDING DEPTH SET ~ VOLUiVIES USED. PERFOH~TIONS, TESTS A/VD RESULTS FISHING JOBS, JU/VK IN HOLE A_ND SIDE-TI~ACKED HOLE AND A~IY OTHER SIGNIFICANT CHAH~ES IN HOL~ CONT)ITIONS. 2/29 PB'TD 9198'. Flow testing. 2/1-13 2/20-29 Fiow tested. ikiddid in small rig and killed well. Pulled packer and tripped in with RTT$ packer and set at 6610'. Tested above and below packer for commnnication. Ran tubing to 9109~ and set packers at 5262' and 6682'. Flow testing. ce t ore o g Ls true SmW~:D C.K. DZETZ ~T~diSS~t. Area Admin. Su~vr. nA'~'~ 3/19/6g NOTE--Report on this form is required for each calendar month, regardless of the status of operations, an~ must be file~ in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless othe~ise directed. ~,ATE OF ALASKA Il I~l.' TYPE OF WELL: OIL,,.ELL~] GASWELL [] '~ DRY [] b. TYPE OF COMPLETION: NEW ~ WOrK PLUG OVER ~ DEEP- DIFF. 2. ~AME OF OPRRATOg Pan ~erican Petroleum Corporation 3. A~DR~SS 0~ 0~:~RATOR _._ OIL AND GAS-CONSERVATION COMMITTEE reverse side) ! i i i i I WELL cOMPLETION OR RECOMPLETION REPORT AND LoG* .. Other Other Commingled SUBMIT IN DUPLI~ ,' See omer st ructions on - ' 5. AP1 N~C. AJ~ COD None Assigned ADL- 17595 ~, IF I~, ~~ OR ~IB~ ~. UNIT,Fa OR ~SE , , MGS State 17595 9. W~L NO. 4 Middle .Ground Shoal Sec.. 31, T9N, R12W, S.M. ;- ' P~ 0. Box 779- Aa:chorase, Ala.~,~Ska: 99501 ~, LO~CAT~ON .OF ~!ELL (~e~ort. location clearly~ang::in fivcorda~b~ with any State requirements)* .~ 11. ~C., T., R., M., (~M At su~ace~ 1971'~FNL, 591:' ~L,.. Section 31, T9N, R12W, S.M., .Caiss6n off Leg 2 o~m~w~ At t~P prod. interval reported below t~ total 88~:~L,~ .~. 712~ ~L~. 8ect~On.. 31~ ' ~ 1916'~, 932~ ~'~ 8ect~°n 31, 6~-6 Recomn_ 6/24/64 [ 8/24/a , [~: -r '~ 3/7/68 t ~ 75' ~S~ · 42-70' ~S~ 18. T~fD~., ~ &-TVD~9; PLUG, ~CK MD & ~. ~ ~L~LE CO~L., 21. 'INTERVALS ~RILLED ' T:VD 9215'~ 'ii 9198, . .[ ~w~Y. 2 ROTARYTOOLS 0 -- TD CAsLz ~ooz, s 9202 ~. PRODUCING) ~V~(S), OF ~S ~MP~TI~~, BO~M N~E (~ A~ ~)* ~. W~ DI~ON~ ~ SURV~ ~D~ 5310-9120' '~- Hemlock No -2~. ME ~ffEC AND OTM' LOGS ~ None . · CASING RECORD (Report all strings set in well) 20" 1" 94# [.H-'40 I 1003'. 26" 13-3/8'? /54.5 & 61# ! 3-,55 [ 1987' 17%" :-5/8. [36,40&43.5#~-55&N~80 7t51' I2~" 2~. LINER ~CO~ 6935 215 ~ _ ~8. P~O~TIO~S OP~ TO PRO~O~ (in~e~al, s~xe ~d numar) SCREEN (MD) See Attachment i I 30. PllODUCTION CEAIE~NTING RECOI~ 1500 sx 2500 sx 765 sx 525 sx I Alt/fOUNT PULLED i i i TUBING DEPTH ~ (MD) .[[ PACKER S~-~I~ (MD) 9109' Uoner 5262' ,I L~er 668~' 2.0. ACID, SHOT, FZLA. C~I"UlqE, CF_AVIENT SQUI~IZE, ETC. D~-I' ~V~ (MD) [ ~o~'r :2~ KI~ O,F M~~ U~ 1 i DATE FIRST PI%ODUCTION I FRODUCTION METIiO'D (Flowh~g, gas lift, pumping--size and type of pump) [WELL STATUS (l~roducing or [ si~ut-in) ~ ': 2/21/68 '~ Flowing ._ ] A ~r~ ~,,,,,~,s~. I'zovss ~s~m 'lcuc~:<~.,s:~z~.I:~OD'S: FOB OIL--BBL. G2~--M;CF. WATER,-~BBL. I GAS.~i zone-.~/:o/o~ - I ?f, 11~-/~/,04 ITEST ~OD E-F-C zon'e-3/S/dS ! 24- !I2/'+76z~ I ~ I' I ' . ~ lin; 'l 450 ~LOW, TU~,~r.~ lC~§m~ Pm,:ssm~ ]CA~-Cm~i~Z) 'mZ~--~ " GAS-:.~c~. W ~ , lob'. ~aWTY-~'i ~m~S. Z~U I ---- '[~.-~OU~ m~T~ ;I 19~6 ' ' ~, 4~-1-6 , I 42.0° , ,, 70 ] .... ] "' > [ 333 ' 'l- 150 ... | j }4.90 .. 81. DISPOSITION OF OtS (SOld, ,~eg .for/uel, ~ente~, etc.) ' - ' t TEST WITNESSED BY Flared ,, s2. '~iST o{~" iT¥'J,C"~E-NTS Well History and List off Perfforations, Core Data '' ~3.'I hereb~ certify tha-t the forfgoing and attached information is c0n~Plete[and ~o~reet as determined from all'available records SIO~D ' . ~ .... TIT~, SS r:. Area Admin. SupYro D*TE 3/13/68 , ", . , ~? , ..... *(See Instructions and Spaces I~or Additional Data on Reverse Side) INSTRUCTIONS · · · . f - C_~neral: This form is designed f6~: ~submitti~ng a compiete and correct, well completion report end log on . ? ! [ . :~. ,' ail types of lands and leases in Alaska. ~ ....... - .~ _ . · '.Item: '16: "lnd.icate which elevation, is used'as: reference (where not otherwise shown) for depth.h~easure~' -.. ;:''merits given in ather spaces on this. form"'6nd in any attachments. : r · ~ i' ~lt~ms 20,',~ncl 2-2:: If'this well is'comple, ted for sepa-i'aT6 pF0d.u.ction from more than one interval zone ~ "~- :(multiPle"compl~tion)- so state'in item 20,'and" in item 22 ,show the .prcducing int¢rvall or intervnls, ' ' -.- ~-~ .- '- t ~ :~op(s);. Bottom(s)~ ~nd name (,s) (if'any) for only the interval reported in. item 30. Submit a separate report, i (page) on this form, "dequately identified, for each adcf:~tional interval to be seperately produced, show- ing the adiditional d~.ta pertinent to such interval. : --' · I;tem26:i ';Sacks :Cement": Attached supplemental r~cords ~6r'~ fhis well should show the details of an~/bui- ~tiPle~:stage'cementing an5 the Io¢.~tion of the cementin~g :too'l.: ' '- ; :" -' : ':L >" '~" ..... ' . '-- ~ltem ~21h Submit'~ sePnrate completion '~'eport on. _th[~ .form ilo; each interval to be separately produced. .(See instr0ction for items.20 and 22 ~bove). F ....... c, c.',-i ,'.' ~ , ~ 34. SUMMARY OF .F'O~I. MA.TION TESTS INCLUDING IN .TERyAL TESTED, PRESSURE DATA A_N'D ~ECOVERIF_~.OF OIL, GA~, .~ ... .- ~ · , ~., WATE. H AND MUD .- .... · .... ' . ~, · . , :~ .. NAME ! -. ~ ...... .... i ' ' - · '.... ... "' ........ ~' '~ :' MGS nd 2670' ---~ · . : '/ · . .. ., . " . · : i." ' ' ' , ~'.": ' , Hem ~ ;7i375 .,..,,~, ' ' ' ' lock ' '~'~'~n.,. ,t. . ~.. - ~. . , · ~ ., ,~ .~ ., . · . . . ~ : I . ~., ., ! . ~ . ._. ~ · , ~ · ; · - ;'-'i i'i.: :",' .......... ~ ~ . · · .. . . ........ _ · , ~,.~ ...... . .. ....................... ... ........... ,....~- ,. · · ~. COR,E DATA, ATTACH BI{IE~ DESCItI.PITIONS O1~ LITHOLOGY, POROSITY, FRACTURF~, APPA1R~-NT DIPS , · ' ' AND DETECTEI) SHOWS O~' OllJ, GAS OR WATER. : _ · , ( ~, ~ . . .. .. _' ~ . . ..., _ ( . .. See . ........... · Attachment ,. :. .: .. · . ( ~ ~ . . : . * · [ ,- - · b' ,"; /., ~.[' . ,',. ... : . ....... · . .. . ,. . i r~ ' . .- PERFORATION LIST~ MGS STATE 17595 NO. 4 1964 Perfomations: 8400-8460' 8805-8865' 7080-7130', 7670-7730' 8070-8130' 5570-5620' 5920-5970', 6136-6186' w/4 jspf Interval 5570-5620' cement squeezed in 1964. 1966 Perforations: Interval 5920-5970' and 6136-6186' cement squeezed in 1966. 9050-9120', 9010A9030', 8985-8995', 8800-.8920', 8610- 8770', 8370-8500', 8210-8255', 8070-8145', 8005-8035', 7820-8005', 7785-7800', 7580-7765', 7480-7520', 7400- 7460', 7375-7400', w/2 jspf and 7245-7260', 7080-7130' 6810-6825', 6775-6785' w/4 jspf. 1968 Perforations: 5310-20' 5450-70' 5530-45' 5580-5610' 5650-60' w/4 jspf. 12/28/67 to 1/07/68 ~1/o8/68 to 1/11/68 ~ 1/12/68 to 1/22/68 1/23/68 to 2/13/68 2/14/68 to 2/19~68 2/20/68 to 3/06/68 3/07/68 Chronological Well History MGS State 17595 Well #4 Recompleted Rigged up for recompletion. Killed well and tripped out with packer. PBTD 9198'. Circulated and cleaned out to 9142'. Gammm Ray log 5000-7000' and perforated 5310-20', 5450-70', 5530-45', 5580-5610', 5650-60' w/4 jspf. Ran completion string tubing to 9105' and set upper packer at 5291' and lower packer at 6707'. Rig released 1/13/68. Flow tested. Checked lower packer and flow tested. Skidded in rig and killed well. Pulled packer and tripped in with RTTS packer and set at 6610'. Tested above and below packer for communication. Ran tubing to 9109' and set packers at 5262' and 6682'. Flow tested. Dual recompleted as flowing oil well with one tubing string and zones commingled through dual flow choke. CORE DATA - MGS STATE 17595 #4 Core 1 Core 2 Core 3 Core 4 Core 5 Core 6 Core 7 Core 8 Core 9 Core 10 Core 11 7340-64', Rec. 24', SS, gy-brn, vf-m, ang-subang, clyey, poor-good show, 1~' coal. 7366-97', Rec. 28', oil ss & cgl, vis por & perm, fairly tite, well fract. 7399-7410', No recovery. 7458-82', Rec. 24', oil ss & cgl, good oil stn, fl, cut. fair pot & perm. except in local cly tire areas. 7522-47', Rec. 25', 2' sh, 23' vf-c ss w/generally clayey matrix, common fract w/oil stn, fluor, cut. 7597-7610', Rec. 4', oil cgl, fri, highly fract, generally tire, good cut in stn pomtions. 7715-42', Rec. 27', oil cgl& ss w/est poor-fair pot & perm, good fluor, cut, stain. 8024-36', Rec. 12,, 3' pebbly ss w/good stn, fl, cut 7' coal & lignite, 1.5' shaly lignite, 6.5' sh, dk gry. 8181-96', Rec. 15', ss, It gry-tn, vf-m, occ crse gr, cly, carb. 8600-15', Rec. 11', 5' sh, 6' ss, f-crse, good fl, stn~ cut. 9205-15', Rec. 10', sh, dk gry. Form No. P---~4 I~EV. 9-30-6~ STATE OF ALASKA suBMrr nv DEPLZCA~ OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT O'F DRILLING AND WORKOVER OPERATIONS 2. NAME OF OP~TOR Pan American Petroleum Corporation 3~ ADDRESS OF OPEI~ATOR P. O, ]Box 779 - Anchorage, Alaska 99501 4. LOCATION O~F WELL Leg 5, 1971' FNL, 591' FWL, Section ]1, T9N, R12W, S.M. - MGS Platform 'B' APl NUA{ERICAL CODE None Assigned 6. LEASE DESIGNATION AND SEEIAL NO. ADL-17595 7. IF INDIAN, .'%ZXDTTEE OR TRIBE NAAIE 8. LrNIT,FA!~M OR LEASE MGS State 17595 9. WELL NO. 10. FID AND POOL, OR WILDCAT Middle Ground Shoal 11. SEC., T., R., M.. (BOTTOM HOLE OBJECTIVE ) Sec. 31, T9N, RlZW, S.M. 12. PERMIT NO. 64-6 13. REPORT TOTAL DEPTH AT END OF MONTH, CI4_A2qGES IN HOLE SI~,E, CASING AND CE!ViENTING JOBS INCLUDING DEPTH SET A_ND VOLUlVlES USED, PERVO.RATIONS, TESTS ANT) lq~ESULTS, FISHING JOBS, JLrNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHAN~ES IN HOL]~ CONDITIONS. 1/31 Flow testing. l/l-7 t/8-9 1/10-n 1/12-31 Rigged up for recompletion. .. Killed well and cleaned out to 9142' Perforated 5310-20', 5450-70', 5530-45', 5580-5610', 5650-60' with 4 jspf and set completion tubing at 9105' Upper packer at 5291' and lower packer at 6707' Flow testing. RECEIVED FEB 1 14. I hereby certify %~ha.t ' ' d correct smz~D~/'-: UTL~ASst. AreaAdmin. Supr. DATI~ 2/12/68 NOTE--Report on this form~,,'/required for each calendar month, regardless of the status of operations, and must be fJlecl in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. l~orm No. P--4 REV. 9-30-67 STATE OF ALASKA O~L AND GAS CONSERVATION COMMITTEE A~ONT'HLY REPORT OF ~DRILLING AND WORKOVER OPERATIONS SUBMIT IN DEPLICATE ~, API' NU~IERICAL CODE ' None as signed LEASE DESIGNATION AN'D SElqIAL NO. ADL.-l?595 1. 7. IF INDIAN, ALOTTEE OR TRIBE NASIE 0IL ~ GAS [] WELL WELL OTHER 8. ~'IT F~M OR LEASE N~ME MGS State 17595 2. NAME OF OPEP~%TOR Pan American PetroleUm Corporation 3'[ 'ADDRESS OF OPEI:G~TOR ' P. O- Box 779 - Anchorage, Alaska 99501 LOCATION O,F WF. LI~ Leg 5, 1971' FNL, TgN, R12W, S.M. 591' FWL, Section 31, 9. IVELL NO. 10. FIELD A.ND POOL, OR WILDCAT Middle Ground Shoal 11. SEC,, T,, R., M., (BO~I'OM HOLE OBJECTIVE) Sec. 31, TgN, R12.W, S.M. 12. PER/ViIT NO. 64-6 13. REPORT TOTAL DEPTH AT. END OF MONTH, CI-L~NGES IN HOLE SIZE, CASING AND CEIViENTING JOBS INCLUDING DEPTH SET AND VOLLrMES USED, PERFORATIONS, TESTS ANT) RESULTS, FISHING JOBS, JUNK IN HOLE A.ND SIDE-TRACKED HOLE AND A3qy OTHER SIGNIFICANT CI-L%/~F~ IN HOL~ CONDITIONS. 12/31 12/28-29 Rigging up workover rig. Skidded and began to rig up workover rig. ,, srGmm ...... C.K. DIEq~z T~TLEASS't. Area Admin. Supvr~A,,.i 1/5/68 , ~ , NOT£--Report on this form is required for each calendar mo~th, regard[ess o[ the status o[ operations, and must be fi[e~ in duplicate wit}] the Division of Mi~e$ & Minerals by the 15th o{ the succeeding month, un[ess otherwise directed. Janu~-y 9. I968 Pan Am~te. an Per. rolm op~ator Aucho~a~8, Ala~h 99~01 Su~e,sed ~ ~ approved copy of Sudr7 Hot,ce (1-3) f~or the.. abOVe eq, tf~ned Form Ho. P--4 P,~EV. 9-30,-6~ STATE O,F A~LASKA SUBMIT 1~ DEPLICATE OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF :DRILLING AND WORKOVER OPERATIONS -5. AP1 NUA~ERICAL CODE None as signed 6. LEASE DESIGNATION AND SERIAL NO. ADL-17595 1. T. IF INDIAN, ALOTTEE OR TRIBE NA.%IE O,L I~. GA8 ~ WELL WELL OTHER 8. LrNIT,F.klLM OR LEASE NA_ME MGS State 17595 2, NAME OF OPERATOR Pan American Petroleum Corporation P. O. Box 779 - Anchorage, Alaska 99501 4. LocATION OF WELL Leg 5, 1971' FNL, T9N, R12W, S.M. 591' FWL, Section 31, 9. WELL NO. 4 10, FIELD AND POOL, OR WILDCAT Middle Ground Shoal 11. SEC., T., R., M., (BOTTOM HOLE OBJ'~CTIVE ) Sec. 31, T9N, R12.W, S.M. 12. PER1ViIT NO. 64-6 13. REPORT TOTAL DEI~TH AT END OF MONTH, CI-IA~NGES IN HOLE SI~E, CASING AND CE1VIENTING JOBS INCLUDING DEPTH SET A_ND VOLUlVIES USED, PFA{FOt{ATIONS. TESTS A/WI) RESULTS. FISHING JOBS, JUNK LN HOLE A-ND SIDE-TILACKED HOLE A/W~) A~IY OTI-IER SIGNIFICA/%IT CIiA/~GES IN HOL~ CONq:)ITIONS. lZ/Sl 12/28-29 Rigging up workover rig. Skidded and began to rig up Workover rig. 1~. I hereby certify that the fgregoing is~,and~rrect S~GNED ~-~-/~ .~ ~ TITLEAss't. Area Admin. Supvr~A.,.~ 1/5/68 [ , NOTE--Report on this form is r~J~ed for each calendar month, regardless of the status of operations, and must be fJle~J in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. - F'ORM 4'70 P ?aoI tr COllpoIg2ION P. O. Box 779 Anchorage, Alaska 99501 January 4, 1968 File: Re: FKK-4-986.511 Application for an Order Permitting Dual Completion of MGS 17595 Well No. 4 with Downhole Commingling of State "A" and State "E-F-G" Pools Mr. Thomas R. Marshall, Jr. R E C E IV E D State Petroleum Supervisor Division of Mines & Minerals 1C'.. ~.,.~" ~ 3001 Porcupine Drive Anchorage, Alaska 99501 .... ~,~ ......................... DIVISION OF hAINES & MINERALS Dear Sir: ANCHORAGE ¢..A~a~E"¢"~merican Petroleum Corporation on behalf of itself, Phillips Petroleum Company, Sinclair Oil & Gas Company, and Skelly Oil Company, respectfully requests administrative approval to simultaneously produce the State "A" pool and the State "E-F-G" pools at their MGS 17595 No. 4 through a single tubing string. Permission was recently granted by Mr. James A. Williams' Western Union message of December 26, 1967, to similarly produce MGS 17595 No. 11 as the result of the hearing of Case No. 56. · ~`/~$~i~~~~`~B~{~~c~mp lished through a downho le dual- flow choke in such a manner as to preclude cross flow between zones in the event the well is shut-in. Production tests will be obtained which will allow allocation of production between zones. Approval to complete MGS 17595 No. 4 in this manner will allow a more economical completion and more efficient use of existing reservoir energy to lift oil to the surface. In support of this application the attached sketch shows the downhole equipment, appropriate sliding sleeves, packers and seating nipples to allow complete control of the well, as well as necessary individual zone testing. Also attached is an amended Form P-3, ~'Sundry Notices and Reports on Wells," indicating our change of plans for this well. Yours very truly, Area Superintendent At t achme nt s FORM $~ 2'*. $7 SU BJECT~ . 7,5'O ' P/t~.AM'ERICAN PETROLEUM CORPO.'~"~,TION ENGINEERING CHART (TRACING) r~u£ ,WOO,/.., APP. B ~ r/~r~.ss. #}; Jr ~ ~/,'¢ ' '~ X 7;' Form P--3 · REV. 9-30-67 STATE O,F ALASKA Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate OIL AND GAS CONSERVATION; COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proPosals to drill or to deepen or plug back to a diffierent reservoir. USe "APPLICATION FOR PERI~IT~" for sUch proposals.) 1. OIL [] OAS [] WELL WELL OTHER 2. NAME OF OPERATOR Pan American Petroleum Corporation 3' ADDRESS OF OPERATOR P. O. Box 779 - Anchorage, Alaska 99501 4. LOCATION. O'F WELL At surface Leg 5, 1971' FNL, 591' FWL, Section 31, T9N, RlZW, S.M. 13. ELEVATIONS (Show whether DF, RT, OR, etc. RKB 75' MSL 5. API N~CAL CODE None A s s igned 6.LEASE DE~iIGNA~UION A-ND SERL4~ NO. ADL - 17595 7.IF INDIA/~, ALLOTTEE OR TRIBE NAME 8. UNIT, FA~R1VI OR LEASE NA/VIE MOS State 17595 9. 1VELL NO. 4 i0. FIELD A~D FOOL, OR WILDCAT Middle Ground Shoal 11. SEC., :T., R., M., (BOTTOM OBJECTIVE) Sec. 31, T9N, R1ZW, S.M. 12. PERMXT NO. 64-6 Check Appropriate BOX To I,nc[icate Niature of N~oti'c'e, Re,port, or Other 'Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL PULL OR ALTER CASING MULTIPLE COMPI,ETE ABANDONs CHANGE PLANS (Other) EUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING 8HOOTING OR ACIDIZINO ABANDONMENTs (Other)  NOTE: Report results of multiple completion on Well ompletion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting an.y proposed work. This notice sets forth our intent to dual complete this well using a single tubing string. A combination sliding sleeve and dual flow check valve will be installed between 5250' and 6219' in order that production from both the "A" zone and the "E-F-G" zones may be accounted for separately. RECEIVED DIVISION OF MINES & MINERALS ,qqCHOI~GE 16. I hereby certify that ~the foregoing ~true and correct ('/K/, 1/4/68 SIGNED ....... -~ '. TITLE Ass't. Area Admin. Supvr. D*TE (This space for State e'~ co~z~zo~s o1~ llerliov TITLE See Jnstrudions On Reverse Side Dm:eld)er 28, 1967 Pin Au~rie~n ~etroleum Corporstian, Anehor~e. AI~ 99591 lhst:~ b~ ~ eppravml ~ of Sund~y ~ot~-'e (9-331) hr! L. Vouder~ ELV:~a Enclosure ;:: ,.'.' :: : .... ........ . .,, Form P--3 REV. 9-30-67 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE O'F ALASKA OiL AND GAS CONSERVATIONi COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen or plug back to a diffierent rese~woir. Use "APPLICATION FOR PERA/IIT~" for such proposals.) OIL [] (;AS ~-~ WELL WELL OTHER 2. NAME OF OPERATOR Pan American Petroleum Corporation 3. ADDRESS OF OPERATOR P. O. ]Box 779 - Anchorage~ Alaska 99501 4. LOCATION. O,F WELL At surface Leg 5, 1971' FNL, 5C)l' FWL, Section 3.1, T9N, R12W, S.M. 13. ELEVATIONS (Show whether DF, RT, GR, etc. 14. API NU1ViF2~CAL CODE None Assigned LEAS]~ DESIGNATION A-ND SERL~L NO. ADL - 17595 7. IF lIN-DIAN, ALLOTTEE OR TRIBE NAME 8. UNI% FAi~iVI OR LEASE NA2VIE MGS State 17595 9. WELL NO. 4 , 10. FIELD .A2~D POOL, OR WILDCAT Middle Ground Shoal 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 31, T9N, R12W, S.M. 12. PER/VLIT NO. RKB 75' MSL 64-6 Check Appropria~ Box To I, ndlicate Nlat'ure of NOtice, Report, or..Other 'Data . NOTICE OF INTENTION TO: TEST WATER SHUT-OFF ~ PULL OR ALTER CASING ~-~ FRACTURE TREAT MULTIPLE COMPLETE REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF: FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* · (Other)  NOTE: Report results of multiple completion on Well ompletion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an}' proposed work. ~ . The following procedure will be followed to make this well, which is currently producing oil from the E-F-G zones, into a dua1 well to produce from the A and the E-F-G zones: i. Kill well, pull tubing and clean out to PBTD 9198'. Z. Perforate between 5310' and 5660'. 3. Set dual packers at 5Z50' and 6719' and land 2-3/8" dual tubing strings at 6719' and 9120'. 4. When the E-F-G zones have cleaned up, the short tubing string will be plugged at 6719' and a sliding sleeve will be opened bet- ween 5310' and 5660' to produce from the A zone. 16. I hereby certify tha~ :.the foregoing ts ~ila~and correct TITLE AS s'to Area Admin. Supvr. DATE 12/28/67 (This space for State o~ffice use)..o CO~ONS Od~P~iOV~, DATE See [nstrudions On Reverse Side Form SA 1 IIfEIifOI~AN~IIM State of Ale~ke TO: ~ DATE : FROM: SUBJECT: August 30~ 1967 lttddle Ground Shoal Pan American Petroleum Corpo Strip log for above referenced well is located ~;.~i([~.'~?'~:'t?',.~ ...... /~.A/'. FORM 470 Z.57 PAN AMERICAN PETROLEUM CORPORATION P. O. Box 779 Anchorage, Alaska 99501 January 26, 1967 File: FKK- 90-WF Re: Form P- 7 Completion Report MGS State 17595 ~4 Mr. Thomas R. Marshall, Jr. State of Alaska Division of Mines and Minerals 3001 Porcupine Drive Anchorage, Alaska Dear Sir: Enclosed please find two Forms P-7, Completion Report, for the well MGS State 17595 No. 4, with attachments describing the perforations and chronological well history. Sepias and prints of the required electric and lithologic logs have been furnished previously. Encls. Yours very truly, Area Supe rintendent SUBMIT IN DL ~- STATE OF ALASKA '~see ~m~r in- structions on OIL AND GAS CONSERVATION COMMITTEE reverse side) WELL COMPLETION OR RECOMPLETION REPORT AND LOG* la. TYFE OF WELL: b. TYPE OF COMPLETION: NEW ~] WOnK ~ WELL OVER OIL WELL [~ WELLGAS [] DRY [~ Other DEEP-[] PLUG ~--~ DIFF. ~--] EN BACK RESVR. Other NAME OF OPERATOR Pan American Petroleum Corporation ADDRESS OF OPERATOR P. O. Box 779, Anchorage, Alaska 99501 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)* At surface 1971' FNL, 591' FWL, Sec. 31, T9N, R12W, S.M. At top prod. interval reported below 1853' FNL, 750' FWL, Sec. 31, T9N, R12W, S.M. At total depth 1916' FNL, 932' FWL, Sec. 31, 14. PERMIT NO. T9N,.R12W, S.M 64-6 15. DATE SPUDDED 17. DATE COMPL. (Ready to prod.) 16. DATE T.D. REACHED 6- 24- 64 8- 24- 64 12- 28- 66 DATE ISSUED 4-23-64 Effective: July 1, 1964 5. LEASE DESIGNATION AND SERIAL NO. ADL- 17595 6. IF INDIAN, ALLOTTEE OR TRIBE NAME __ : 7. UNIT AGREEMENT NAME ---- S. FARM OR LEASE NAME MGS State 17595 9. WELL NO. 10. FIELD AND POOL, OR WILDCAT Middle Ground Shoal 11. SEC., T., R., M., OR BLOCK AND SURVEY OR AREA Sec. 31, T9N, R12W, S.M. 12. BOROUGH 13. STATE Kenai Alaska 19. ELEV. CASI~G~AD 42.70.' MSL 18. ELEVATIONS (DF, RKB, ET, GE, ETC.)* RKB 75.00' MSL 20. TOTAL DEPTH, MD & TVD [ 9202 TVD 9215 FID 21.PLUG, BACKT.D., MD & rVV 22.IF MULTIPLE COMPL., HOW MANY* 9198 -- 23.INTERVALS ROTARY TOOLS CABLE TOOLS DRILLED BY > [ 0 - TD [ -- 24. PRODUCING INTERVAL(S), OF THIS COMPLETION TOP, BOTTOM, NAME (MD AND 6775 - 9120 MD Hemlock 25. WAS DIRECTIONAL SURVEY MADE Yes 26. TYPE ELECTRIC AND OTHER LOGS RUN [ 27. WAS WELL CORED IES, GE-Sonic, Mb/L, Dipmeter, Density, CBL, Mud ] -Yes 28. CASING RECORD (Report all strings set in well) CA~INC SIZE WEIGHT, LB./FT. DEPTH SET (MD) HOLE SIZE CEMENTING RECORD 20" 94 13-3/8" 54.5 9-5/8" 1003' 1987' 36, 40, 43.5 7151' 26" 1500 Sx :17½" 2500 Sx i!2~" 765 Sx AMOUNT PULLED 7" 6935' 525 Sx 29. 30. TUBING RECORD SCREEN (MD) SIZE PACKER SET MD) LINER RECORD SIZE . TOP (MD) [ BOTTOM (MD) SACKS CEMENt* i: [ F- Set in 1{6~ e--~-~endea ~o ~u-~ac~ in 31. PERFORATION RECORB (Interval, size and number) See Attachment A DEPTH SET (MD) 6726' 6719' 32. ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC. - ! DEPT. H INTERVAL See Well ~st]ry AMOUNT AND KIND OF MATERIAL USED 33. * PRODUCTION DATE FIRST PRODUCTION [PRODUCTION METHOD (Flowing, gas lift, pumping size and type o! pump) [WELL STATUS (Producing or 9-13- 64 [ F l~°wing DATE OF TEST HOURS TESTED ] CHOKE SIZE PROD'N. FOR [ OIL----BBL. [ GAS MCF. [ WATER--,BL. GAS. OiL RATIOsee Well History TEST PERIOD FLOW. TUBING PRESS. CASING PRESSURE CALCULATED OIL--BBL. GAS MCF. WATER BBL. J. OIL GRAVITY-AP1(CORR.) 34. ~ISPOSlTIOr OF GAS (Sold~ used ~or ~uel., vented, etc.) TEST WITNESSED BY 35. LIST OF ATTACHMENTS "A" (list of per. forations), Well History, IES and Mud Logs ':"~.'"-I~JN 36. I hereby certify, that ~he. foregoing and attached information is complete and correct as determined from all'available D~fTE ... 1- 25.- 67 *(See Instructions and Spaces I:or Additional Data on Reverse Side) INSTRUCTIONS · .. ~ form is designed for ·submitting a complete ~and Correct 'well ~co. mpletion report and ?g on.all types of .lands.and leases ~o either a Federal agency or a State agency, ] ~:~'~uant tO applica~ie Federal and/or State laws'and!regulations, i Any'necessary specia~ instructions conqerning the use 'of this form and the number of copies to be p~rticularly iwith regard~to local, area, or regional procedures and practices, either are shown below or will be issued by, or may be obtained from, the local Federal off]ce. See instructio.ns on items 22 and 24, and 33, be!0w...regarding separate reports for separate completions. pcior to the time this summary record is submitted, copies of all.currently available il0gs (d,rHlers, geologists; sample anff core analysis, all t~pes,electric, etc.)~ forma- .i,<'~:.~sure ,tests,; and directional surveys, should be attached hereto~ to the extent required'by applicable Federal and/or State laWs and regulations. All attachments ii~ed on',thislform, see item 35. '- ~hcre are no applicable 'gtate requirements, locations on Federal or Indian land shouId be described in"accordance wi~h Federal requirements~ Consult local S~ate ,:~fice ~or.specific instructions. !:.aIicate which elevation is used as reference (where not otherwise shown) for ~depth measurements given in other spaces on this form and i~iany attachments. ~4: If thru well is completed for separate production from moke than one interval zone (multiple Completion L, so state ~n item 22, and in item 24 show the producing h~tervals,'~bp(s),' bottom(s), and name(s) (ff. anY) for-.only/.~he interval re~ ~ l~m ~. SUbmit a ~parate rep6~ (page)~ on thi~ fo%~"ad~uately identified, additional intbrval t0 be ~epara~ly produced, showing th~ ~ffditi~nal data pertinent to such interval. ' ' . ~ ~ ~ . ",:;~:zks Cement": Attach~ supplem'en~l records for this .well Shoed show the de~ils of any multiple stage cembnting and the location of the bementing to01. m~. a ~parate completion re~rt on this form for each inter~al to be separately produc~. (S~ inst~ction for items 22 and 24 a~ve.) ' ~L"J ~ ~,' ~ OF:PORO,US ZONES: ' ; . ~nL ]MPORT~,N~ ZONES 0r r0ROSIT¥ aND. COnTeNTS' THER~Or'; CORED iNTrgV~LS; AND ~LL DR]LL-S~r~ ~rSTS, [NCLU~]S~ '3~. - GEOLOGIC MARKERS .~NTERVAL TESTE~ CUSHION USED, TIME TooL~oPEN~"FLOWiNG AND SHUT-IN PRESSURES, AND RECOVERIES ~'~0N . TOp. ~ .: BOTTOM ' : ," DESCRIPTION,, ~ONTENTS, ETC. '- TOP: :-... . . ., ~ ~ . ~,.= : ~. . ._ -, ~ .... . ~ . . : . : ~ : ' .:=. :., .-.. .. ....' . ~ · . . , ~ ,. ~ . . ~ . , . . : '. . · : . , . .-'; ~ , , , . '. ; ' ~ ~- ", - . .-? ~ ' . . . .. · .. ~ . . - . ~:.. : ... . ~ .. . ~ ~ : . . . . ,.:' :. , , /- : ~ , ::] - . .. ·. . ' , . ~ ~ . .: ~ . .. . . . ., : . ~ .. .., , . ATTACHMENT A TO P-7 MGS State 17595 No. 4 1964 perforations: 8400-8460, 8805-8865, 7080-B130, 7670-7730, 5920-5970, 6136-6186, w/4 jspf. ............ ~ Interval 5570-5620sqqeeze cemented in 1964. 8070-8130, 5570-5620, 1966 perforations' 9050-9120, 9010-9030, 8985-8995, 8800-8920, 8610-8770, 8370-8500, 8210-8255, 8070-8145, 8005-8035, 7820--80.05, 7785-7800, 7580-7765, 7480-7520, 7400-7460, 7375-7400 w/2 jspf and 7245-7260, 7080-7130, 6810-6825, 6775-6785 w/4 jspf. 5/lO/66 to 11/13 11/14 11/18 11/25 11/27 12/8 12/9 12/11 lZ/lZ lZ/16 12/28 MGS State 17595 No. 4 Chronological Well History Subsequent to Resumption of Operations Installing caisson and riser to extend subsea wellhead to deck of MGS Platform t3 as a separate leg of platform, Move on with workover rig. Install 7" tie-back casing. Drill cmt to 6200', squeeze perfs. 5920-5970 and 6136-6186 w/200 sx cmt. Drill cement to 6000 and pressure test, drill 6000-6200 and pressure test. Clean out to 9198'. Perf. 9050-9120, 901029030, 8985-8995, 8800-8920, 86'10-8770, 8370-8500, 8210-8255, 8070-8145, 8005-8035, 7820-8005, 7785-7800, 7580-7765, 7480-7520, 7400-7460, 7375-7400 w/2 jspf and 7245-7260, 7080-7130, 6810-6825, w/4 jspf. 6775-6785 Flowing on 3/8" choke w/ TP 450, casing 250 psi, 6% BS&W. Flow 37-1/2 BFPH on 1/2" choke, TPF 250 psi, BS&W trace to 10°/0. Flowed 1153 PF in 24 hours on 3/4" choke with TPF 160 and O to . 8a/0 BS&W. Flowed 893 BF in 18 hours on 1" choke w/ TPF 150 and BS&W trace to . Completed as flowing oil well. IP 1180 BOPD on 1" choke, TPF 150 psi. Form No. P--4 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE Effective: July 1, 1964 *~/v" or~,=EAnchorage .~=~'~ =~ ~,, ~ MGS State 17595 Well No. 4 LESSEE'S MONTHLY REPORT OF OPERATIONS State ........ _A_!__~_m__k~_ _ ................... Borough ........ ._~__.e___.~___J, ...................... Field ............... D.__.e_v___e__l___o.~__~...__n_.t._ .............................. TY~e followi~f is a eorreo~ report of operatior~s and proch~e~ion (i~ol~di~f drillir~f an, d prod~ei~ wells) for tl~e mo~th of ....... .D,.e_~_~l~_~_~_r. ............... 19__6_.~_, _ ........................................................................... ....... p,___O__,___.B_o__x___7_7__?_ .............................. .4rent's address Anchorage, Alaska $ifined, ...... ~ ....................... Cu. F~. OF GAS SEC. &~o BAaRELS o~ Om ~4 oe ~4 (In'thousands) -- SW 1/4 SW 1/4 Sec. 31 20,014.3 6925 0 98' Well 6719'. Di 9120', 83 -6825', 6~ CaC1 I2-9- I (]ALLONS OF GASOLINE RECOVERED :d 12-28.66 as p: :run 12 66, BARRELS OF WA?Ea (If none, so state) 2OO :oducing x comple with die.',ei and open slidl ',' $98s, soo,-s9 00', 8210' 8255', ~170'=81~ Perforated 2 -7520 "7400' 4 ,785'. in and . Test sting we [1. , 7400'- 7245' - bbls o: ~d well. OIVI$10N ( REMARKS (If drilling, depth; if shut down, oause; date and result of te~t for gazelle® content of ~a~) None oil well. tion string ng sleeve. >.0'. 12-5-66. 0{, JSPF r460'. 260', diesel 12-8-66. NOTE.--There were ..~..0..t..0.-1-.4.:..~ ....................... runs or sales of oil; ........... No .............................. M cu. ft. of gas sold; NO runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE.~Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Division of Mines & Minerals by the 6th of the succeeding month, unless otherwise directed. Form No. STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION Effective: July 1, 1964 ~.1 ~- · ANo DF~,~-~ Anchorage j!~'-~ ~ L~^~ ~,,~ ADL 17595 L~^~ o~ "~,* ~ MGS State 17595 Well. No. 4 LESSEE'S MONTHLY REPORT OF OPERATIONS State ................. __A_.l__~_s___k__a_i ......... Borough .......... K.__e._n_._a_.i._ ..................... Field ~ Tl~e followir~ is a eorreo~ repot* of opera~ior~s arid prodt~e*ion, (ir~el~dir~ drillir~ arid produoir~ff wells) for ~l,e rnontl~ of ........... __N_.9_y__e___m__.b__e_r. ......... 19_6__6.__, ............................................................................ ./l~er~'s address ........................ __P_ .... _Q;_ _ _ _B_ _ _o_ _x__ __7_ ~_9_ ............. Corr~pan!] Cu. F~. et* GAs S~.c. ~N~. B~E~E~S OF Om ~ O~ ~ (In'thousands) SW 1/4 sw 1/4 Sec 31 0 9198'. Tri comPletio: .an 7" tie 11-21- sx Class · Held GR IC;r~ela{ion a~d 69'4~'. ~rill~d re~ainer 696 tai~e r ~345~sa471and andl C er~ent [Bondl log s 3000 do~n d~ill p~pe a~d run tub~ ~nu Displac, tubing, (~AI, LONS OF GASOLINE RECOVEEED ° l° with tubin . 12-1-~ -66, Pulled Cam lng to drilling d cem, ran casin .th CaC12 0. lled ceme: logs. Dr: .rculate o~ o 9198', 11 · Trip in 28-66. 3 calcium 6. nt to PI scrape zate r at ~22R. Dr xt 6000- .lied cen It gas ki~ -27-66. with scr ubing p~ ware r. ~ARRELS OF WA~g~ (If none, so REMARKS · (If drilling, depth; if zhu~ down, osu~e; date and result o! test for pzoU~e content o! gsa) . None 6. Move eron Ire eck. Dri ~TD 5521 to 645c~ 5250 psi iii c e me )200', 11 rant 620 :k 7070' Ran 5" ~pe r to rforatir <[ipple ul d workove r x Works 7" lied packer , 11-22-66. · Set packer Tested and xt 5762-6000' 25-66. Ran -6228' and Drill re- ]amma Ray ,207'. Lay gun stuck BOP' s, NowE.--There were ................ .N...o.. ......................... runs or sales of oil; ............... .N...0. .......................... M cu. ft. of gas sold; ............................. ..N...o. ......................... runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE. Report on this form is required for each calendar month, regardless of the status of 9perations, and must be filed in duplicate with the Division of Mines & Minerals by the 6th of the succeeding men[hi, ~ ..... ~ i ','! ;" !/ directed. -' ~tlter J. Hickel~ ~mimo~ Stste 17~95 #~ American Petroleum Cozpor&t~, Ope~tor Dma~ ~r. K~ebtll: Notice (~-3) mi ~ ~ capt~ Nllo Eric losuze FORM 470 2-57 PAN AMERICAN PETROLEUM C01LoOIL ION P. O. Box 779 Anchorage, Alaska 99501 November 22, 1966 File: Re: FKK- 1738-WF Form P- 3 MGS State 17595 Well No. 4 Mr. Thomas R. Marshall, Jr. Division of Mines and Minerals Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska Dear Sir: Enclosed are three copies of Form P-3, Sundry Notice, setting forth our notice of intent to perforate intervals in MGS Oil Pools E, F and G, and complete the subject well for production. Present perforated intervals in Pools B and C will be squeeze- cemented prior to additional perforating. Pool F is currently perforated at 7092~ to 7094 ft. and 7130 to 7131~ ft. in MG$ State 17595 Well No. 6, the twin well to Well No. 4. Your approval to include these intervals in a "sand" completion was provided by Form P-3 on March 17, 1966, prior to establishment of vertical pool limits. Bottom hole pressure measurements taken in Well No. 6 on September 30, 1966, conclusively establish that the Pool F perforations are not contributing production in this well; however, they will be squeeze-cemented at an early date to conform to the new regulation. The interval 7080 to 7130 ft. in MGS State 17595 Well No. 4 correlates with these perforations in Pool F. Therefore, at this time, we wish to obtain approval to perforate the intervals in Pools E, F and G, as listed on our Form P-3, with a six months' exception to Rule 2 of Section 2061.1, of the amended Alaska Oil and Gas Regulations, to allow us sufficient time to squeeze-cement the perforations in Pool F in MGS State 17595 Well No. 6. Yours very truly, . K. Kre~ill Area Superintendent Enclosures DEC 1 1966 PlVl$1OiXl OF: MINES & MINERALS ANCHORAGE SUNDRY NOTICES AND REPORTS ON WELLS (Do not u~e this form for proposals to drill or to deepen or plug back to a dlfferen~ re~ervoir, Use "APPLICATION FOR PERMIT--" for such proposals.) (Other lnstruetlon~ re- I-- __ OIL AND GAS CO:,~2VAT;ON CO~$~i~!]SSION ver~ ~me) ~. ~*:~ ~z~i~,~o,~ ,:x~ ~.',~..~ ~. ADL - 17'-95 WELL %Vi~LL OTIIER 2. ~AA~}~ OC OPERATOR Pan American Petroleum Corporation aDDRES~ OF OPERATOR P 0 Box 779 - Anchorage, Alaska LOCAtiON OF W~LL (Report locatlor~ clearly and la accordan'~e with any S't~te requirements. See al~o space 17 below.) At surface 1971' FNL, 591' FWL, Sec. 31, T9N, 1Rigw-, S.M. I 15. ELEVATION~ (Show'whether NO. 7. UNIT MGS State 17595 9. W~LL NO. 10, FIELD AND POOL~ Ok WILDCAT 1Vliddle ~round Shoal ]Sec. 31, T9N, RIgW, S.M. t 12. BOaOUGH .. '[ 13. u~ 64-6 ~ld RKB 86' above MLLW; newRKB 82.4' ] Kenai Alaska 10. Check Appropriate Box-TO Indicate .Nature of Notice, Reportt or Other Data - NOTICE OP INTENTION TO: FRACTURE TREAT ~IULTIPLE. COMPLETE SHOOT OR ACIDIZ]~ ABA~N'DONs REPAIR WELL CHANGE PLANS (Other) Completion procedure WATER SI/UT-OFF REPAIRING WELL S~[OOTING OR ACXDIZlNG ABAA'DONMENT' (Other) (NOTZ: Report results of multlplo completion on Well Completion or Recompletlon Report and Log form.) DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all perttneut details and give pertinent dates, including estimated date of starting any proposed work. If well l~ ' direotionally drilled, give ~ub~q" lop, oas and measured and true vertlcM depths for all marker~ and zone~ portl-' nen~ ~ ~i~ work.) · - ... .. . The completion procedure for the subject well 'will be as Extend underwater wellhead with 16" riser. Tie back 7" casing to surface. Drill plugs and packer. Squeeze perforations at 5920-5970' and 6136-6186'. Set packer at 6700'. .-- Perforate with 2 jspf..-(i.i,9050_9120, 8610-8770' 8070- 9010-9030'. 8370-8500' 78Z0- 8985-8995' 8210-8255' 7785- 8800-8920' 8i70-8180' 7580- (i) (z) (3) (7) Perfora~.e with4jspf- 7~5-7~60' 68!0-68~5' · 7080,,7i30' 6775,,6785' 8145'. 7480-7520' 8035''7375 ' ' -74o.0 smx~o .. F.K. KREBLLL Area Superintendent (This ~pace /or Federal or ~t~te ~cs use) . ~ ~ . co~D!~zo~s o~PPaow~, ~ ~: · / ' .. . ..... .... DEC 1 1966 . , DIVISION uk MINE5 a MINE~La 28, 1966 AC2acheg is ~ approved ~ of[ the Su~ Hoi::Lce (P-.3) on th~ ~ ~£erenced Very ~ruly yours, Pe~roleun · L~: dc Form P--3 STA'~ ~)F ALASKA SU~MIT IN TRIP (Other lnstructlonb OIL AND GAS CONSERVATION 'COMMISSION verse side) SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen or plug back to a different reservoir. Use "APPLICATION FOR PERMIT--" for such proposals.) .TE* OIL ~-~ GAS WELL WELL OTHER 2. NAME OF OPERATOR Pan American Petroleum Corporation 8. ADDRESS OF OPERATOR P O Box 779 - Anchorage, Alaska 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements.* See also space 17 below.) At surfoce 1971' FNL, 591' FWL, Sec'. 31, T9N, R12W, S.M. ADL - 17595 6. IF INDIAN'~ &LLOTTE~E OR TRIBE NAME Effective: July 1, 1964 5. LEA'SE DESXG,ATZ~-- AND s'~-Rx,~"No, 7. UNIT AGREEMENT NAME 8. FARM~ OR LEASE NAME MGS~ State 1759-5 9. w~mL NO. 4 10. FIELD.~AND POOL, OR WILDCAT Middle Ground Shoal 11. SEC.~ ~., B.,, M., OR BLK. AND BURYEY OR' AREA Sec. 31, TgN, R1ZW, S.M. 1:2. BOROUGH 'J 18. STATE Kenai J A la s ka 14. PER~IT NO. ]15. EI'~'VATIONS (Show whether DF, ,RT, OB, etc.) 64-6 pld RKB 86' abOve MLLW; newRKB 82.4' ze. Check Appropriate Box T° Indicate Nature o[ Notice, Report, or Other Data - NOTICE OF INTENTION TO: TEST WATER SHUT-OFF I I PULL OB 'ALTER CASING FRACTURE TREAT MULTIPLE. COMPLETE SHOOT OR ACXDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) Completion procedure SUBSEQUENT REPORt* OF: FRACTURE TREATMENT -.~LTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) NOT E:,Rep0rt results of multiple' completion on wen ompletion or Recompletion Report[and~Log'form~) DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including ,estimated date of starting any proposed work. If well is dtrecttonally drilled, give sul~face locations and measured and true vertical depths for all markers and ~zones perti- nent to this work.) * The completion procedure for the subject well will be as follows: (1) (z) (3) (4) (5) (6) Extend underwater wellhead with 16" riser. Tie back 7" casing to surface. Drill plugs and packer. Squeeze perforations at 5920-5970' and 6136-6186'. Set packer at 6700'. Perforate with 2 jspf.-(i 9050-9120' 8610-8770' 8070-8145' 9010-9030' 8370-8500' 7820-8035' 8985-8995' 8210-8255' 7785-7800' 8800-8920' 8170-8180' 7580-7765' 7480-7520' 73,75-7460' (7) Perforate with 4 jspf- 7245-7260' 6810-6825' 7080-7130' 6775-6785' 18. I hereby eertif_y that the f~oregoing is tr~e and correct · TITLE Area Superintendent 11/18/66 (This space fOr FederaL/or~ Sta~e ofilee use) CONDITIONS O~ A PRO¥ L, X~ Alq~: *See Instructions on Reverse Side NOV 2 Z 1966 DIVI,$1ON OF MINES & MINERA~ ANCHORAGE RACY,kAOND M. THOMPSON Englewood, Colorado 90110 )&q-_006 STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINES AND MINERALS ALASKA OIL AND GAS CONSERVATION COMMITTEE 3001 Porcupine Drive Anchorage, Alaska RE: THE APPLICATION OF THE PAN AMERICAN ) PETROLEUM CORPORATION, covering the devel-) opment of part of the MGS Field, for an ) exception to Section 2061.1 of the Alaska ) Oil and Gas Conservation Regulations, ) Title 11, AAC ) IT APPEARING THAT: Conservation Order #31 October 19, 1966 (rehearing of Conservation Order #26 - August 4, 1966) 1. The Pan American Petroleum Corporation submitted a petition dated August 24, 1966 for a rehearing of Conservation Order #26 involving an exception to Section 2061.1 of the Alaska Oil and Gas Conservation Regulations, Title 11, AAC. 2. Notice of rehearing was published in the Anchorage Times on September 12, 1966. 3. Personal service of the notice of hearing was made to all affected parties. 4. A rehearing was held in the City Council Chambers of the Z. J. Loussac Library, Anchorage, Alaska on September 23, 1966 commencing at 9:30 a.m. 5. Testimony in support'of the petition was given by Pan American Petroleum Corpor- ation and objection to the petition was presented by Shell Oil Company. AND IT FURTHER APPEARING that certain exceptions to Section 2061.1 of the Alaska Oil and Gas Conservation Regulations included in Conservation Order #26 should be granted because of the hazards and hardships of developing multiple reservoirs in this off- shore area from permanent platforms by means of directed holes. �f AND IT FURTHER APPEARING that reservoir data presented at the rehearing is insufficient to determine that a change in the existing acreage spacing requirements of Section 2061.1 of the Alaska Oil and Gas Conservation Regulations is necessary. AND IT FURTHER APPEARING that certain amendments should be made to clarify or modify the rules listed in Conservation Order #26. These amendments are incorporated into the restatement of the rules listed belpw. CONSERVATION ORDER #31 Page 2 October 19, 1966 NOW, THEREFORE, IT 'IS ORDERED that the area described as follows is affected by this order. T9N-R12W, S.M. Section 19: S/2 Section 30: All Section 31: All T9N-R13W. S.M. Section 25: E/2 Section 36: E/2 T$N-R13W. S.M. Section 1: All Section 2: E/2 Section 11: SW/4, E/2 Section 12: SW/4, N/2 Section 13: W/2 Section 14: All Section 23: N/2 Section 24: NW/4 The following special rules apply to the aforementioned area: RULE 1 Spacing Footage - Oil wells may be completed closer than 500 feet to the section lines or quarter section lines and may be completed closer than Y 1000 feet to any well drilling to or capable of producing from the same! pool except that no oil well shall be completed at a distance of less r than 500 feet from a lease line where ownership changes. RULE 2 facing Acreage - No more than one oil completion in a pool as designated in•i F Rule 3 shall be allowed in each governmental quarter section or govern mental lot corresponding thereto. RULE 3 Pool Designation - Until ordered otherwise, the vertical producing intervals! shall be divided into seven (7) pools which will correlated with the following intervals in the Pan American Petroleum Corporation State 17595 #4 well. MGS Oil Pool A - 5300' to 5720' MGS Oil Pool B - 5720' to 6100' MGS Oil Pool C - 6100' to 6400' MGS Oil Pool D - 6400' to 6750' MGS Oil Pool E - 6750' to 7050' MGS Oil Pool F - 7050' to 7375' J MGS Oil Pool G - 7375' to 9215' / CONSERVATION ORDER #31 Page 3 October 19, 1966 RULE 4 Permissible Commingling - A well may be completed taneously from any one or more, or from all provided that the production from the pools in the well bore and produced at the surface requirements may be met; a. Production from MGS Oil Pool A, as be segregated in the same well bore inating from any other pool. in and produced simul-� of the above seven pools' is adequately segregated/ so that the fallowing defined in Rule 3, must from production orig- 1 b. Production from MGS Oil Pools B, C, and D, as defined in Rule 3, may be commingled in the same well bore, but must be segregated from production from any other pool. C. Production from MGS Oil Pools E, F, and G, as defined in Rule 3, may be commingled in the same well bore, but must be segregated from production from any other pool. This Order is made pursuant to Section 2061.3 of the Alaska Oil and Gas Conservation Regulations and shall continue in force for a period of not more than eighteen (13) months from the date of Conservation Order #26 provided, however, that wells which have been drilled and completed and are being produced in compliance with the pro- visions of this Order, or any other Order of the Committee, may be produced in com- pliance with the terms of said Order notwithstanding the fact that such Order may have expired or have been terminated, or that there may be pending a request that said Order be modified or terminated, until such time as the Committee shall, after notice and hearing, enter an Order establishing different rules, requirements, or provisions. The Committee on its own motion, or at the request of any interested party, may at any time during the temporary period set this matter for further hearing for the purpose of determining whether the present Order should be amended' or modified. The Committee will, in the absence of a request of an interested party for a hearing at an earlier date, set this matter for hearing for a date which shall be not later than 30 days prior to the date of the expiration of this Order, for the purpose of determining the proper spacing and field rules which should then be applicable to this field. 11 CONSERVATION ORDER #31 Page 4 October 19, 1966 DONE at Anchorage and Juneau, Alaska, and dated October 19, 1966. Thomas R. Marshall, Jr., Exedutive Secretary Alaska Oil and Gas Conservation Committee Concurrence: a es A.Williams, Chairman aska Oil and Gas Conservation Committee eir Charles F. Herbert, Member Alaska Oil and Gas Conservation Committee arl L. VonderAhe, Member Alaska Oil and Gas Conservation Committee i Otto jj ti3x POH3% j kdOOj AaC • f • fJ �J , P' P U �vJ I 1 ell trI u � t 1 (�y ''!• i �� �� (� U' _' 1% U�`�'I • i� t � t _. ��� it �I �,%��,, /�� � ,! � I •i I I VI i:i ---j—r--�--�----• -_- -- - rim►: '. _..___._ r--�`-� •-----r---- -- --- " __— -r- - 11 ., A < <� �i� . J`""f� •��` �.�—ter �V��l....'�_,.�A_...� � ,M�` � r i A. dOO Otj3x `f Oti3% ti Oii3) { is • It]/,(/(`�.^�,�w `^ eras a.uxsa�.w.y.wti.+r-. . �• { 1� t � i j � I'4 g � , ' f �\ �::::.� j t t� I 1 i - ,t i j V �Y,r,.r { '• ,i ;a f ., it i• a 11'^"� I f' ' -i t .l_. .I. _I .l .,. .i. I t i ,r. I t 1 � r y y'4 ry , 1 j Q A rj _ � t j 1 I- r I - ' '. .r I � .'' ! I- I R.., •�) �' ,'1 � .. li 1R`{•"""0 .I I I i - I' O.Y.... � l:t 9 i , I I I � � • 1 t..�{ � N tl.rR +I • ' ED n c I f f , I _ r •� . - ewooarivsatu.u.,.ra>`s...,.e�.ww�ec.. _o..:a,..,, n�r..oauw+.er�..w.•+e.ao-.:�'y.u:.a.an.i•wtwa.uaas...ra�•w.. Hw.w.�l 1{ ' I r . it I ,, -..�� ... _. ,...,..�........xw......-_. _.d.__..._.,....d-,. �- ..,.. .....�., .. ... ... , �� lily,',• ( '' ` , r , . .• �. � .. , I (1 {' ./ 1 I I , , . +.:t .. � •+..+�.rc.,� wam.�.e�s.m•m•rcwrww t F�{ J � 1 I i ') �, , ( , '/•^"� enw*.a•src�c�anr.rrrnawrr++n....«.._ �._�..u,s,w„�wa..... 'i , (//' �lYJYOJM�•!•r+••,.M1w.s..'�+•a.•w.•��•��Rw•.r�w•.•y, hh fill r 11 I I h � -{ ' � °yam � ,� # `- • ' + ` u) t:. r C' •+' , ,r�� . � �}, �r gg dry ryvr 1 IIII �+. I ' Zja., �� ...:.�i"`;nr.�i�z,wia"�:«r �4,., 'i.;a7 a :�s-, '• ,. � �, t �•^• - p'1 4.J r I `. +i �I � i:! ,r' � \ h �. t� A S i •Y `" 4 7 �. ' 03 E3 0 C 77 4'/0 2.5'7 PANAMERICAN PETIIOLEUM C0 ION P. O. Box 779 Anchorage, Alaska 99501 May 11, 1966 f4,,~ c File: FKK- 608-WF Re: Forms P-3, MGS State 17595 No. 4 and MGS State 17595 No. 6 Mr. Thomas R. Marshall, Jr. Division of Mines and Minerals Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska Dear Sir: Enclosed are two Forms P-3 describing: 1. Change in production interval for MGS State 17595 No. 6, and g. Resumption of operations on MGS State 17595 No. 4. With replacement of the caisson by J. Ray McDermott & Co. , Inc., the mechanical problems on Well No. 4 mentioned in the P-1 for Well No. 6 have been overcome. Well No. 4 will be completed in the conglomerate section and Well No. 6 in the sand section as detailed in the Forms P-3 for the respective wells. Yours very truly, F. K. Krebill Area Superintendent Enclosures 470 .~.57 PAN AMEmCAN PETROLEUM CORPOP. ATION P. O. Box 779 Anchorage, Alaska 99501 May 11, 1966 File: FKK- 607-WF Re: Form P-3, Sundry Notice, MGS State 17595 No. 4 Mr. Thomas R. Marshall, Jr. Division of Mines and Minerals Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska Dear Sir: Enclosed please find three copies of our application P-3, Sundry Notice, describing our intention to resume operations of MGS State 17595 Well No. 4, Permit No. 64-6. Please return one approved copy at your earliest convenience. Yours very truly, F. K. Krebill Area Superintendent Enclosures Fo~m P--,%. STA1 )F ALASKA Sm3MZT IN TRIP1 (Other instructions ..~ re- OIL AND GAS cONSERVATION COMMISSION verse side) SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen or plug back to a different reservoir. Use "APPLICATION FOR PERMIT--" for such proposals.) Effective: July 1, 1964 5. LEASE DESlONATION AND SERIAL NO. ADL-17595 6. IF INDZAN~ ALLOTTEE OR TRIB]~,.NAME - - 1, ?. UNITAGREEMENT NAME OIL [] GAS WELL [-] OTHER : WELL - -- 2. NAME OF OPERATOR 8. FARM OR LEASE NAME Pan American Petroleum Corporation MGS State 17595', 8. ADDRESS OF OPERATOR 9. WELn'NO. Box 779, Anchorage, Alaska 4 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements.* See also space 17 below.) At sur~oce 1971' FNL, 591' FWL, Sec. 31, TgN, R1ZW, S~ M. 64-6 ELEVATIONS (Show whether DF,-B?, OB, eto.) RKB 75' Above SL, 86' Above MLLW 14. PERMIT NO. 10. FIELD AND ,POOL, OR W1LDC&T Middle Ground :Shoal SURVE~ OR ~REA Sec. '3'1i }T9N, "Rizw, S.M. 12. BOROUGH -. '1 18. STATE Kenai I Alas ka Check Appropriate Box T° Indicate .Nature of Notice, Report, or Other Data . ' NOTICE OF INTENTION TO: [ SUBSEQUENT REPOR~ OF',' SHOOT OR ACIDIZE ABANDON* REPAIR WELL ] ; J CHANGE PLANS [ _] [ (Other) · ' ' 'f I · · · NOTE:Report results of multiple .comPletion on Well (Other)Resume operatrons, on shut-znIX ~1 v~ell.- ' ~ompletion or Recompletion Report:andLog'fOrm,) 17. DESCRmE PROPOSED OR C0~PLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled, ~ive subsurface locations and measured ~nd true vertical depths for'all markers and zones perti- nent to this work.) · This notice sets out our intention to resume operations on this well in order to put the well on a productive status and to complete in the conglomerate section 7300' and below. Perforated intervals above 7300' will be individually cement squeezed prior to proceeding with completion work. 18. I hereby certify that tb~-~0~egoing is tr~and correct J('~ "<' ';~ Area Engineer SIGNED.. . ,~_)/~..~ t.A..A_~J¢' ~// TITLE May 11, 1966 TITLE *See Inrlructions on Reverse Side Form P--3 ST.~ ~F ALASKA SUBMIT IN TRY (Other instructl~ ~ re- OIL AND GAS C~RVATION COMMISSIONverse side) ~--~ SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen or plug back to a different reservoir. Use "APPLICATION FOR PERMIT--" for such proposals.) WELL WELL NAME OF OPERATOR Pan American Petroleum Corporation 8. ADDRESS OF OPERATOR P.O. Box 779, Anchorage, Alaska 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements.* See also space 17 below.) At surf, ce 1971 ft. from N Line, 591 feet from West Line, .Sec. 31, T9N-R12W, S.M. 14. PERMIT NO. 15. E'.~VArIONS (Show whether DF, ar, as, et~) 16. Effective: July 1, 1964 LEASE DESIGNATION AND ltlERIAL NO. ADL 17595 ... UNIT~AGRE~MENT NAME - M. G~S~'~: ~$tate '17-595 10. FIE~D' ~AND .POOL, ~R WiLDC~T~ Middle ~:;Gr~'d~ Shoal Sec/-:3'~, 9N~i2W~ S.M. Che~k Appropriate Box T° Indicate .Nature Gl: Notice, Report, or Other D~ !~ ~' NOTICE OF INTENTION TO: SUBSEQUENT FRACTURE TREAT MULTIPLE. COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) WATER SHUT-OFF (Other, ha ~~.~ (No~E:Report results of Completion or Reeompletion ~ep 17. DESCRIBE PROPOIBED os COMPLETED OPERATIONS (Clearly state all pertineut details, and give pertinent dates, includi.n~-:eittmated date of it~rt~ng any proposed work. If well is dlreetionallF drilled, sire s~s~e l~tions and measured and true vertical depths $2r~'dtl'~markeis a~d:~zo~ perti- nent ~ this work.) * Well name formerly Middle Ground Shoal Well No. 4. Fom~:/P~:3:~ reflect change of name which now includes state lease nu~~'. 18. I hereby certify that the foregoinl is true and correct ,,.,,..,_ ,o, APPROVED B~ (-~'~'"'"~' _ ' CONDITIONS OF APPROVAL, ~ A~: TITLE Execut i-ye Secretary *See Instructions on Reverse Side FORM 470 2-57 PANAMERICAN PETROLEUM COILOOIL TION P. O. Box 779 Anchorage, Alaska December 10, 1964 File: AEP-1092-WF Re: Middle Ground Shoal No. 4 Well Information. State of Alaska Division of Mines and Minerals 800 "L" Street Anchorage, Alaska Attention: Mr. T. R. Marshall, Jr. Gentlemen: Reference is to our letter of November 13, 1964, File AEP-982-400.1 concerning our Middle Ground Shoal No. 4 well. Enclosed please, find one cut of core samples for this well, completing our obligation to supply information, upon well cOmpletion, in accordance with regulations. Please acknowledge receipt by signing and returning one copy of this letter. Yours very truly, A. E. Piper District Superintendent Receipt Acknowledged ~I~ARTIVI~T O~r ~AT~I~AL ~IE~O~RCI~ g. A, Watlington D~..a trice Landman Pan Am~rtcaa Petroleum Corp. gmchorage ~ AlaSka gab jeer: Middle Ground Shoal APt ~_ 7505 Learnt No. 186839 Dear Mr. Watltngton~ ia accordance with ym~r request of November 25, 1964 and Section 505~72 of the Aia~ka 0~I and Cm~ Regulation,, con~ider this letter a c~ft~~ ~o ~he ~ffect that the annual delay remtal~ prevt~mly tendered by your c~pany under th~ t~ of nub Jeer l~$~e at th~ rate of omc dollar (8i.00) per acre~ ar~ ~ e~ve~t~d to miriam royalty ~yabI~ a~ ~he ~ame r~te c~emc~g a~ the ~?i~ati~ of th~ le~a~ Fear, having its anniversary date ~ ~ebmary 1, ~c ~:o ~is conversion results from the d~tominatiom mdt by Mr. To? .:~'arshall, grate Petroleum Geologiet, based on mup~rting data g:-:-:tted by you ~ovember 2, aa to th~ atatu8 of th~ Middl~ Ground:. : ~1 8tare Well No. 4 being in a completed shut-in condition. Very t~ty your~ ~ ROMCOE E, BELL, Director N~[dp cc: C, F~ Herbert, J. A. Williams, Director To Marahall/K. Vonderhae FORM 470 2.57 PAN AMERICAN PETROLEUM CORPORATION P. O. Box 779 Anchorage, Alaska November 13, 1964 File: AEP-982-400.1-WF Re: Middle Ground Shoal No. 4 Well Information State of Alaska Department of Mines and Minerals c/o St. Mary's Residence 8th and L Street Anchorage, AlaSka Attention: Mr. T. R. Marshall, Jr. Gentlemen: Attached for your information and file please find one blue line and one sepia print of the sample description - lithologic log of Middle Ground Shoal No. 4 well. One washed.and dried'cut of samples has also been forwarded to you. Please acknowledge receipt by signing and returning one copy of this letter. A cut of the cores from this well is being obtained and will be forwarded as soon as poSsible. Yours very truly, A. E. Piper District Superintendent Attach. FORM 4'70 2.57 PAN AMERICAN PETROLEUM CORPOP. ATION P. O. Box 779 Anchorage, Alaska November 7, I964 File: Re: AEP-946-400.1 Well Completion or Re- completion Report and Log, MGS #4 State of Alaska Oil and Gas Conservation Commission Oil and Gas Section Anchorage, Alaska Attention: Mr. Tom Marshall RECEIVED ['~OV i 3 i9~4 DIVISION OF MINES & MINERALS ANCHORAGE Gentlemen: This will confirm that the following data, which is applicable to our Middle Ground Shoal State No. 4 well, located in Section 31, T9N, R1ZW, Seward Meridian, was hand delivered November Z, 1964: 1. Form P-7 in triplicate. Z. Sepia and one copy of Induction Electrical Log. Very truly yours, A. E. Piper '~ District Superintendent cc: R. W. Craig w/attachments ~fA~E OF ALASKA (S~~"eri~: s~ruetions on O~ AN~ -GAS CONS~VA~ON' COMM~'~[ON reverse side) E££ective: July 1, 1964 5. LEAS DESIGNATION AND SERIAL~ NO. AgL- 6. IF INDIAN, ALLOTTEE OR TRIBE NAME WELL COMPLETION OR RECOMPLETION REPORT AND LOG * . other 7. UNIT AGREEMENT NAME la. TYPE OF WELL: b. TYPE OF COMPLETION: NEw t--I WORK I'1 WELL ~ OVER OIL ~ .GAS. WELL'~t-.J WELL ~'~ DRY ~-~ DEEP' F~ PLUG F~ DIFF' F~ EN BACK EESVR. 2. NAME OF OPERATOR ~m~ Am~ricau Petroleum ADDRESS.OF OPERATOR FARM OB. LEASE NAME ~adle G~mmd Shoal State 9. WELL NO. 4. LOCATION OF WELL At ..rfa~e 591* At top prod. interval reported below At total depth 9215 ~ 24-64 8- 2:~.. 64 14. PERMIT NO. 17. DATE COMPL. 10. FIELD AND POOL, OR WILDCAT !iidle 9round Shoal · 11. SEC., T., a., M;, OR BLOCK AND SI~RVEY ] OR ~REA. t~On 31, T~, RI~, S.~. - 9215' HI) 915~ ~ " 24. PRODUCING INTERVAL(S), OF THIS .COMPLETION TOP, BOTTOM, NAME Top = 5920, ~Bottam - 886~ :~r ~e~ia~ CABLE ,TOOLS I o 25.WAS DIRECTIONAL SURVEY MADE 26. TYPE ELECTRIC AND OTHER LOSS RUN Dip~e]~ Lp:gm _ l 27. WAS WE~L CORED lES* ~mic,*~ Bey, ~, itro:rnmC:t~ D~nstty ~, ~t Eval~iatLOn Los[ Yes 28. CASING RECORD (Report all strings set in well) CASINO SIZE 13 3/8," 29, SIZE WEIGHT, LR./]~T. [ DEPTH SET (MD) HOLE SIZE 'l' ] / I LINER RECORD 30, ToP (MD) BOTTOM (MD) SACKS CEMEN~$ SCREEN 31. PERFORATION RECORD (Interval, size and ~umber) Pe~£. 8~60, ~805-6~ 613~86, all wi~h ~ Jet CEMENTING RECORD 2500 sks 765 ~ 525 ~s AMOUNT PULLED TUBING RECORD SIZE .. 2 7/8" DEPTH SET (MD) 13~ ' PACKER SET (MD) ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH ~INTERVAL (MD) / AEIOUNT AND KIND OF MATERIAL USE. D / ~ ISqu~~ v/lO0 macks =em~t ! 33.* PRODUCTION' DATE FIRST PRODUCTION I PROD??TION METHOD (.Flowing, gas lift, pumping--size and type o! pump) WELL STATUS (Producing or WATER--BBL. I GAS-OIL RATIO 34. DISPOSITION OF GAS. (~Ot(~, USed yor]uel, ee~te~, etc.) [ TEST wITNESSED BY Vented LIST OF ATTACHMENTS 36. I hereby c~t t~. SIGNED _ ~~~' attached information ts complete and correct as determined from all available reeords~ ~' ' ~ TITLE .stri=t' 8.rinten~qt DATE ~*(See InstructiOns p~ SRacss for Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases to either a Federal agency or a State agency, or both, pursuant to applicable Federal and/or State laws and regulations. Any'necessary special instructions concerning the use of thiS form and the number of copies to be submitted, particularly with regard to local, area, or regional procedures and practices, either are shown below or will be issued by, ,or may be obtained from, the Iocal Federal and/or State Office. See instructions on items 22 and 24, and 33, below regarding separate .reports for separate completions. If not filed prior to the time this summary record is submitted, copies of all currently available logs (drillers, geologists, sample and core analysis, all types electric, etc.), forma- ' tion and pressure tests, and directional surveys, should be attached hereto, to the extent required by applicable Federal and/or State laws and regulations. All attachments should be listed on this form, see item 35. Ifem 4: If there are no applicable State requirements, locations on Federal or Indian land should be described in accordance with Federal requirements. Consult local State or Federal office for specific instructions. ifem ] 8: Indicate which elevation is used as reference (where not otherWise shown) for dePth measurements given in other spaces on this form and in any attachments. Ifems 22 ond 24: If thiS well is completed for separate production from more than one interval zone (multiple completion), so state in item 22, and in item 24 show the producing interval, or intervals, top(s), bottom(s) and name(s) (if any) for only the interval reported in item 33. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, showing the additional data pertinent to such interval. ISem 2?: "Sacks Cement": .Attached supplemental records for this well should show the details of any multiple stage Cementing and the location of the cementing tool. ISem 33: Submit a separate Completion report on this form for each.interval to be separately produced. (See instruction fo~ items 22 and 24 above.) · i : ,, ,. . 37. SUMMARY OF POROUS ZONES: .-. SHOW A!%L I~[PORTANT ZONES OF POROSITY AND CONTENTS THEREOF; CORED INTERVALS; AND ALL DRILL-STEM TESTS, INCLUDING 38. GEOLOGIC MARKERS . DEPTH INTERVAL TESTED, CUSHION US.ED, TIME TOOL OPEN, ~LOWING AND SHU~-IN PRESSURES, AND RECOVERIES ' . FORhfATION TOP BOTTOM DESCR[PTION~ CONTENTS~ ETC. TOP ;,. .. 7366 ;: 7397 Oil Sd. & Cgl. : Tert~y ~ 0 - 9215 -. 7~58 '~ 7~2 Oil Cgl. 7522 ~ ' 75~7 75~7. 7610 0~ Cgl. -. _ 7715 77~2 0~I Cgl. . . . ' . .... 8024 8036 Oil, 'Sd., ~., C~l ": - 8181 8196 Sd. w~th-~od ,h~ 0~1 .. . ~. ':8600 : 8615 Wire Line Si~ll .Cored t~: 7101, 7088,'7076, 6518, 6528, 6424, 6270, --. , . 6165, 6162, 5940, 5860, 5585, ~I, 5~6~, TeSting.- See ~.tta~ed ~:.ll Stm, W~:re Li~ ~d"~oduction Test Sm~, : " '" . : : : . . ; State of Alaska Department of Natural Resources DIVISION OF MINES AND MINERALS Petroleum Branch INDIVIDUAL WELL RECORD . ~lease Date .. 11-1~-66 ,, Sec.:_ : .,3! .... Permit No. ,, 64,6 Issued _ a.-)2-..6a Operator~ .Pan Americ.a.n....Fe.t.. C..o_rp. Location (Surface)_ 591'. FWL.& 1971! FNL:_ Sec, 31 .... Lease No. ADL 17595 or Owner _ l~iddl~ C. rd..qhoal ..qtat~. LoC. (Bottom) ~_ Well No. ,. 4 .... ._ _~_ Area Spud Date... 6._-2a-64 .. Drilling ceased Total Depth 9215' _. _ Suspended. Abandoned. Completed (F-GL-P) 10-13-64 ..... Gas75_ to__1%80~. MCF/D, Bean ..... ~ /64 CP Casing: Size Depth _ Sx Cmt Perf: 8400'-8460' 2 0" 1003 ' 1500 8805 '_8865 ' 13 3/8" 1987' 2500 7080'-7130' ~.-. 9 5/8" 7153' 765 7" 6~35'-9215' 1400 - .//t_ ~~ GEOLOGIC FORMATIONS Surface ~_.L°west Tested. Name Elevation K. _"..to mud line- 188' MLL water level to mud line 102' Gray 36.2° API Cut ..... % to 46' ' · psi, TP psi Pl~ugs"__ 8240_' D,C. retainer 6900' & pg. ......... 6900'.-~792 ' D.C. retainer 5492' & 5492 ' -5379' N prod pc~r 250' W~retrvble pg. 2 its 2 7/8" & tbg hanger-:,~/ W.L. ~-=L~vD'i=' B:.F;--~iv='' 'i'h' tb.g. ~_pDed ~ubsea we~lhead~ _ PRODUCTIVE HORIZONS Depth Contents WELL STATUS Year Jan Feb Mar Apr _May.. June July Aug Sept ~"-'' -' "- ..... __'.'. '..t: -_ '-. -._-.-...,,. ,.,_ ......... __Tested ..below csg. 7.152'-.7456'. (303.')_957 B/D ._-...37.6°_ APl. _1/.2" _bean... Oct Nov Dec __T. P. 235.Dsi DST (perf). 8400.'.v8460' _DST ._(pmrf) 8805.'-8865'.. _ ,. I)ST. _. ~ 8400 ' -,8.46,0 ' .m& --8805 m'm ' 81865 ' , . . 'nET. (.p~-i=)~ 7080'_,.T71301'...: .... . ..... Remarks ~ Contractor... Reading &'Bates National 50 rig, ........... : .......... clo~ed in t9 await shipping facilities. TEST INFORMATION . WLFT NO. 1 (7080) No Recovery WLFT NO. 2 (6528) No Recovery WLFT NO. 3 (6162)' No Recovery wzzz No. 4 (5446-1/2) 14.09 cubic feet of free gas 225'0 cc Oil WLFT NO. 5 (5312) .2',1 cubic feet of free gas · .500 cc' Oil ~,, 50 cc Sand WLFT NO. 6 (3314) 31.1 cubic feet of free gas WLFT NO. 7 (5312) 29 cubic feet of free gas 7000 cc Oil DST No. 1 7153-7456.OH PKR@.7078, 2000' WC.~,....''~'~:'"'"''''~'~'~':. ""~' . ' Summary of'Flows: AVE. AVE. 'AVE.'-~''''~'' -" CHO~ HRS. F, TP ' BOPD MCFD' GOR~..BS&~ - . 1/2" 1% -- 1050.5 222 212' 18% . 1/2" 1%. ,-- "' 600.3 190 "317 -' '" 5/8" 2 '200 956.9 255 260'""'--'. 1/2" 2 235 .956.9 192. 200, 3/16" 2 575 140.6 96 .68{. i/4'" 37,6°API Oil .' :. iFP =. 1181 psig. FFP - 2901 psig · FSIP - 3433 paig. , .' : . . . _ .. Production Test No. 2 8805-8865 PKR@ 8780 Pressure Datum 8835 BHT -,159° F .Summary of ~ows: .. i,. AVE. AVE. AVE. ~. CHO~ HRS. ~TP SO~ ~C~ O0__Z~ }!~ 5/8" 4 71# 312 116 ~73 '1:2% 1/2" 3 66 283' 117 413 1-4 Shut in 2 hours, pump in diesel oil 3/8" 2 ,130 277 110 397 -3/4-1 1/2" 3 90, 347 108 316 ,1-6' 5/8'! 3 90 287 108 366 1-2 36°API oil ' BH Pressure = 3380 psig in 2 hr~,' 345'5. p~sig in 3-1/4 hrs., 3745 psig in 12 hours. ' Static Reservoir Pressure = 4095 psig~. PRODUCTION TEST NO. ·1 "." ' 'PKR SET, AT '83'77 .' PRESSURE DATUM 8400. BI-IT'- 157° F' " 'AVE. '· AVE. ' AVE :. ' -CHOm~ -~otms FTP · ~OP~ MCFD- COR"' ~S&~, ':? . :. 5/8''~. 25 ' 210~)' 766 · 159 '214:-,1' .8-52~ 1/2" 5 5/8" 2 · i/2" 2 ' 3/8" 2 3/8" & !/2" 6 5/8" 3 . 140:' 251 · . 278:',895 ' 148' '166 ' 7;10' · 1.38 · 340 .' 122- '375 . 8-14 150 242' 119 480 .1-'4 '150"' 246 116 468'" 1~2 .. 137 : 255. 1119 465. "' 1-4' 116 '463.. .:3/' 4' ,2 Shut in 1-3/4 hr.- . ' ' None 2 - 145 298..' i18' 39'~4 -, :-' 1/2. · 36.2° AP1 oil .., - BH Pressure = 270.'3'"psig./1-3/4..krs ~'. Si:attc ReservOir Pressure.-. , ,... 3745. -'" ' Ps'iS" ' ... , '-y/~.~, ~a ..... Production Test No. 3 ..... ~(8400-60. 8805-65) '".,'., ~/ " PKU@ 8380, TP tO 8850' Pressure Datum 8633 BHT = 160° F ~ ' S. ummary of Flow: AVE. AVE. AVE. .CHO~ ~S.. FTP ~OPD ,MCFD,· ~0,~,. ~S&W 3/8" 7 170" 301 254' 845 %-10% 1/2" ~%--"'"I30 387 25r9~~.Or Less ~ 3% ];00 417 ...... ~ ' . · - BH Pressure.= 3452 psig in 4 hrs. · ~SCatic Reservoir Pr. = 428'5 psig. ' ' ~ · . " ~.._~N~ x' ,," · _'.' Production Test No. ~ ' 7080-7130 ,""~,.. PKR@ 7055 .PressUre Datum 7105 BHT = 150°, F summary of Flows: . AVE..'AVE. AVE. ~TP_ BOPD MCF~-G__OR BS&W "~'."'7-30 340 :685 --- 285 ~45 "'75 '.138'.'4-10 220 869 ....... 4-5 '190 807 .... .>''' 2 .q~o~ m~s__ 518" 3/8" 3 1/2" 3 5/8" 2 37.6° APl' Oil BH Pr. = 3438 psig in 2 hrs. s:a~i¢ Reservoir Pressure - 3735 · ~o~.c¢~o~ ~s~ ~o. 5 (7670-7730) '. P~:"'~ 7642 = woo . ..' ·., AVE. AVE. AVE. c~o~ ~ouR~ ~FTP_. ~OPD MCF_~ ~ GO~_..~s_aW_ · 3/8" 2-1/2 250~ 479 ''112 .22'9:'!' 1/2% . 1/2" 3 158 538 143 '265'-.,. 1/2-1 5/8" 2 127 773 147 190>.,' 1." 38 50 A~ oil. "-'-. - BH Pr. = '3649 psis in 4-1/4 hfs;' - '-.,~ $~a~ic Re's; Pr. ' ' " /:": ' ~ !..', ,.. ... ,~'z~/:.-."'.~':"' ~ ,-,. ' : ~ .' . j. :. ..',' , .. production Test No.:".'"6''" "'. ' ·PKR~.S033"('S070:S130) '·i'">'"':'""!"' ?~) BHT = 152° F .--....' .. -., Summary of Flows: '... AVE. AVE. 'AVE. · CHOKE' · HRS'..~TP_' "}OPD' MCFD . ./GOR_. 'B:S&W · ~.'3/8"' 6 192# 424· 113 :265:'1: 1-.4% 1/2" 6 131-' 610 133. '"'.'12181'.. :. "%-3. 5/8" 6 ' 104 511, 137' "26'7 ....::'...,- 3/4-3 Production Test No. 7 (7080-713~-~7670-7730, 8070-8130) PKR @ )42, T.P. to 7440 Pressure Datum 7605 BHT = 152° F Summary of Flows: AVE, AVE. AVE. CHOKE HRS~ FTP BOPD MCFD GOR BS&W 3/8" 6 1/2" 7% 5/8" 11 3/8" 1/2" 6 5/8" 4 157# 308 102 336:1 %-30% 119 425 103 242 %-6 83 522 ...... %-5 167 400 ...... %-1 135 507 ...... ~-% 90 57l ...... 36.5°API Oil BH Pr. = 3648 psig in 10 hrs. Static Res Prs . . (See individ~ual PKR @ 554 Sugary of Flows: AVE. AVE. ~ ' ' CHO~ ~S.. FTP BOPD MCFD ~R BS&W 1/4" 7% 1800 204 1180 4830 1/8-1/2 '45-46° AP1 Oil - , BH Pr. = 2554 psis in 2 hrs. Static Res. Pr. = 2683 psig~ Production Test No. 9 5920-5970· PKR @ 5895- (DST Tools) Pressure Datum = 5942 BHT = 130° F Summary of Flows: , AVE. AVEr AVE. CHOKE HRS. FTP BOPD MCFD GOR . BS&W '3/8" 5 308# 586 78 132:1 %-1%?., ,. 1/2" 4 ' 240 727 69 95 %-% 5/8" 5 ' 184 867 79 91 %-3/8 . . · .... . ' ': 37° APl Oil . ' ' '" . ..i'.:.:?~:., ..'.'.... ,' .... _~..: ~,i BH Pr. = 2624 psis in 2-1/2 hrs. BH Pr - '3695 .psis in'6 hr.. SC&Cie Res. Pr; = 3870 psis - ,, · . ' . : :~,.,. · , '.. ' .. ., , -. Production 'Test No. 10 /*% - (6136-86) · P. KR @ 6059 Pressure Datum 6106' BHT = 138° F ~(5~-- {~<~(r Summary Of' Flows: AVE, AVE, AVE°, C'HOKE .HRS,. FTP BOPD MCFD GOR BS&W 3/8" 4. .420~ 753 79 105 1/8-1/2% 1/2" '4 250 704 72 1.02 1/8-1/2 5/8" 4 185 635 72 113 . 1/4 .' 38.4° A~I Oil "~?',,,~ ~, BH Pr.='2723 in 2'.hr /<~ Static Res. Pr. = 2778. psig~':?'2 ¢ ~ ProdUcti6n Test No. 11 (5920-70, 6136-86) FKR @ 5902,. TP to 6168 Pressure Datum = 6053 BHT = 134° Summary o'f FlOws: , Aw..' AV .. AW.. CHOKE , zP OPD MCF COR 3/8'" .6 42'7#' - 745 100 129:1 1/8-1/2% 1/2" 5 341 1127 ...... 1/8 5/8" 6. 270~ 1235 ...... 1/'16 3/8" 4~ , 445 836 308 369 1/16- 1/2" 4~ 3.51 1183 44.2 370 1/16 5/8" C 282 1245 509 410 1/16 36 1°API Oil BH Pr. = ~'655 .Psig in 4 hrs. Static Res. Pr. = 2775 psig ~ _: / /-_r . :- Production Test No. 12 (6136-6186) "Retest" PKR @ 6032, TP to 6294 Pres sure Datum -~O%{ BHT 138° F :. summary of F10w~: AVE. AVE. AVE. CHOKE HRS. . FTP BOPD MCFD. GOR BS&W 5/8'" 4~ 181, . 900 302 334 1/8-1/16% 1/2" 5 262 ' 702 230 328 1/16 5/8': 4 '336 634 161 253 1/16 37;,,4. A I'.Oil ,,.¢ ........................ BH Pr.. = 2723 p~'~ in 4 hr. Static Res. Pr.~= 2803< psig.' STATE Di~SION OF M~S AND MINE~S DEPAET~ O~ ~NATUEAL .P~S0b~RCES Check-off List ~ Safety Inspection - Petroleum 2402. .1 .2 24o3. .1 .2 .1 .2 2406. .1 2407. .1 .2 .3 -5 24O8. .1 .2 .3 24o9. .1 .2 .3 .4 .6 .7 .8 .9 Company ......... - Location .... . ........ Date of Inspection Person in charge of work.' contractor Drlg. Depth ~/, Mud Weight Number of Employees FIRST AID Supplies Personnel Accident Prevention Program Hats, Goggles, Respiratory Equipment CONFINED PLACES ESCAPE E~IPMENT Escape Line Escape Buggy MOBILE E~IPMENT Safety Devices and guards MACHINERY AND E~JIPME~ Unsafe Equipment Walkways Pipe, valves, fittings Stationary tanks Line Spooler GUARDS Dr~wworks Drilling Machinery Line Guards Nip points & cutting edges TTt.UMINATION DERRICK EQUIPMENT Floors Outside platforms Inside platforms Gin Poles Ladders Exits Counter weight s Stabbing boards Weather protection 2411. .1 .2 .3 .1 .2 .3 2413. .1 .2 .1 .2 .4 .5 .6 2415. .1 2416. .1 .2 2417. .1 .2 .4 2418. .1 .1 242o. .1 .2 2421. HOISTING LINES Safety Factor Operations Weight Indicator PIPE HANDLING Securing of Pipe Stands Pipe Handling tools Pull Back Post BLOCKS Crown Blocks Travelling Blocks CATHEADS Rope Anti-fouling devices Rope Guide Friction Surface Projections Operations Chain CHAINS Chains for spinning lines BLOWOUT PREVENTION Type used Te sting procedure-interval FIRE PREVENTION Fire extinguishers Electrical Protection Derrick Ventilation Flares Location of equipment EXPLOSIVES Magazines COMMUNICATIONS Equipment MISCELLANEOUS Cellars Housekeeping REPORTS - Forms available · 'SUMMARY OF OPERATIONS AND TEST INFORMATION MIDDLE GROUND SHOAL NO. 4 · SECTION 1~ T9N: .R12W OPERATIONS: June Spudded 6-24-'64. 'Ran 20" casing i.n 26" hole· Set at 1,003' KB w/1000 sx. Class A and 500 sx. Class A w/2% cac12. 'Top of 20" casing head landed 39' above mud l±ne~ Distance Kg to mud line is' 18~ feeti' and distance MLL water level to mud l±ne is 102 feet. .. -. July. Drilled 17-1/2 inch hole to 2065'. Ran IES, GRN, Microlateral, Density and Dipmeter Logs 1002'-2065'. 8et 13-3/8 £nch at 1987'. Cemented w/2500 sx. Class A. Dr±lled 1'2-1/4 inch hole to 7200', 'Ran IES, GR Sonic, biLL, Dipmeter, Formation Density 1989'-7151' ~Took 18, recovered 15 sidewall cores: 7101' 7088' 7076' 6518' · . . , , , , 6528'", 6424' 6270' 6165' 6162''5940' 5860' 5585' 5441' 5446-1/2' 5312' 5103' 4418' 3312' Set 9-5/8 inch casing at 7153'..KB w/765 sx. Class A cement. Drilled 8-5/8 inch hole to 7366',-coring interval 7340'-7364'. Recovered 24 feet. · · August Tested open'hole interval 7.152-7456' below 9-5/8" casing. Core No. 2 7366-97'. Core No. 3 7399-7410'. Core No. 4 7458-82'. Core No. 5 7522-47'. Core No. 6 7597-7610'. Core No. 7 7715-42'. Core No. 8 8024,36'. Ran 1ES 8144' to' 7152'. Core No. 9 8181'-8196'. .Core No. 10 8600-15'. Core No. 11 9205-15'. Ran'IES, GR-Sonic Microlaterolog-caliper, Dipmeter, Density Log 7158'-9205'. Set 7" Liner 6935'-9215' w/1400, skso Class A + 1/2% Halad-9' Pulled DP to 5964 and circ. 3 hrs. Pipe stuck. Fishing.. September Set 7" casing 6,935' to surface~and cemented with 525 sacks Class A and 99 lbs. h]~-4. Ran CBL 9,'156'-2,800". Ran Gamma-Ray collar locator 9,156'-2,500'. Perforated and tested ~ Perforated and tested 8,805' to 8,865'. Tested intervals 8,406'-60' and 8,805'-65' t~r. ~ '~ested int~r~al 7,080 to 7,130 Perforated ' '. October · Perforated and tested interval..7670-7730' Perforated and tested interval 8070- 8130' Tested intervals ~7080-7130', 7670-7730' and 8070-8130' together. Set DC retainer at 6900' and 20 sack cement plug 6792-6900' Perforated and tested 5570- . 5620' Squeezed 5570-5620' with 100 sacks cement and drilled out. Perforated and tested 5920'70'. Perforated and tested 6136-86' Tested intervals 5920-70' and 6136-86' together. Re'tested interval 6136-86'. Set DC retainer 5492', cement plug 537.9-5492'. set Mode% "N" production packer at 250' with a retrievable plug. Hung two joints of 2-7/8" tubing in' the tubing hanger with a wire line retrievable back pressure valve in tubing. Capped subsea wellhead. Started rigging down 10-13-64. 800 L Street November 2~ 1964 Mr. A.E. Pipe~ Pan Au~ricau Petroleu~ C~rporation P.O. Box 779 Anchorage~ Alaska Dear Hr. P£~r: Re: State Form P-~ ~tddle Ground Shoal Eucloaed ia the approved copy of the State form P-3 oovering £he · suspension and shut-in?status of your co~ap!eted oil well Middle Ground . Shoal ~o 4. Very truly yours; K.L. 7onderAhe If~lir: kp Fo ~,n P--3 STAT~'%F ALASKA (Other inst~uctioz OIL AND GAS COr~aERVATION COMMISSIONverse stole) SUNDRY .NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen or plug back to a different reservoir. Use "APPLICATION FOR PERMIT--" for such proposals.) WELL WELL OTHER 2. NAME OF OPERATOR Pan American Petroleum Co~'p~ration 8. ADDRESS OF OPERATOR P. 0. g~ 779, ~chorage, l~ 4. ~ocA~zos OF WSh~ (Eeport loeatio~ dearly and tn accordance with any State requirements.* See also space 17 below.) At surface 591' E of W Lt~, 1971' 8 of N Line, ~ctl~ 31, TPN, RI~, $.M. 15. E,.~VA?IONS (Show whether DF, -ar, ~, et~) ~ '= 4..75(Sea ~el)= .l~86~ Tide) 14. PERMIT NO. 6/4~6 re- LEASE DESIGNATION AND ffERIAL NO. API~ ~175~5 , IF INDIAN. ALLOTTEE OR ~IBE NAME 9. W~L' ~0." 10, FIE~D AND[~OOL, OR WILDCAT Sect~ 31, io~, ~1~, s.~. 16. Check Appropriate Box T° Indicate .Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF I I PULL OR ALTER CASING FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON$ (Other) oil ~ell 17. DESCRIBE PROPOSED OR cOMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including, estimated d~te of"starting any proposed work. If well is directionally drilled, give subsurface loc~tions and measured and true vertical depths foi~ all marke'~s and zones perti- nent to this work.) * -. This isa report of the suspension ot operati~on this SI oil well l op~a~ion~ to resume with the cons~uc~ion ota permanent platform and sales facilities. .. TD 9215, (PBTD 9156) 7" liner [rom 6935* to 9215', 7" casing tied intoli~r and-ex~ending to wellhead, lerforated and tested intervals 8600-60, 8805-65, 8070-8i30, 767~-t73D, 7080- 7130, 6136-86, 5920-70, ~570-5620..Bridge plug 8350', cement plug 82 _4G-_.~350, brig~e_~'.plug 6900, ~nt plug 6792-6900, peri, 5570-5620, squeezed ~ith 1~0 sx., b~dse plht-[~P2, cement p!ua 5379-5~92, production packer ~ith plug 250~· 2 joints of tubing*hunE'~in !tubi~ hanger ~ith a back pressu~ valve in lo-er 'Joint, subsea wellhead installed #nd capped.: 18. I hereby certify t ego i ue and.correct SIGNE (This space for Federal or State"o~]~ t~s ) CO,bi,ZOOS dF ~PPR~vAL, ~ ~: TITLE TITLE District Superintendent Z)~,T=. ~'~er 728~. 1964 ? *See Indructions on Reverse Side · --"'-- B'fi'd~et Bureau No. 42-R356.5. UNITED STATES LAND OFFICE _._.~_~.h_?_~g_e: DEPARTMENT OF THE INTERIOR LEASE NUMBER___~.D..L-__!.7-~-9-~ ........... GEOLOGICAL SURVEY UNIm____~__'_l._d__d___]._~__...(~_~_O__L].__~__d__~_~_b.O__~_!_ ~4 P. A. ~';186839 LESSEE'S MONTHLY REPORT OF OPERATIONS The followir~g is a correct report of operatiorcs arcd prodz~ctiorc (ircch~din~ drillir~$ arcd prod~circg wells) for tl~e rrcorct]~ of .......... __O__c__t_9_~b_9_~r_ ................. , 19._6-?-~, ............................................................................. ~lge~t's address ..... _P_ ;_ _ _ _0_ _: ___B_ 9_ _x___ ~ _7_ _9_ .................................... Corr~pa~y .... Phone ...................._B__R. _ _ _8_ _-__6. .4. _O. . _l_ ............................................ ~f E e n t ' s t i t l e ._ _ .D_ .i_ _s_ .t_ .r. .i. _c_ _t_ _ _ _S_ _u_ _p_ _e. .r. . '.z_ _n_ t_ _ .e_n_. .d. e. _ ~ ~ ..... SEC. AND BARRELS O~' OIL (]RAVIT¥ OASOLINE WA~ER (If (If drilling, depth; if'shut down, oause; ~ Or ~ TWP. RXN~E W~.LL D~ CU. F~. or Ois GALtONS OF BX~LS O~ REMARKS NO. Pao.vc~. (In thousands) date and result of test for gazoline I~ECOVERED none, so state) ooa~nt o! ga,) ~ 1/4 9 12 4 9 * 3865 36 0 0 None ~ 1/4 ~c. 31 P 9215', Rigging do~n. ]'erforated and t~.sted inte~'val 7670-7730'. Perforated and re. .~terva[ 8050-8130' Tes :ed intervals 70B0-7130' ]'670-7730' and 80"0-8130' together ~t DG ~etaJ~ner at 6!~00' nd 20 sack ceme'at plug 67(.t2-6900'. Per,ore,ted and tested 570-56~.0'. Squeezeii 557(~-5620' with 100 sacks cem(~.nt and drilled o~to Perforated an~ ~sted ~920-70'. Pe!:fora .ed and tested 6136-86'. "~ested intervals .~i920-70' and 6136-i gethe~~. }~etested [nter~'al 6136-86' S~.t DG retaJ.ner 5492', cemen! plug 5379-5492' 25~' ro uc- io. a p ug. ~bing .n t[.e tubing hang~.r with a ~ire line retrie~able back pressu~:e valve in tubing ~pped ~ub ~ea well l~ead. Started zigging down 10-].3-64 · · · Report ~rrect:.on t.o Septeml~er's : 14 ~ 2850 The e two fi,~ure total 6715 barrels r~f crude produced. The dift erence between th{ amoqnt produ:ed, 6715/barrels, a.~d th~ amount run for sa~e, 5552 amount to 1163 bar~els. Th Ls o 1 was so contam[nateqt with mud chemical~ that it could not be cle~ up tOr sale md ttad tc be dumped! to p~.ts. / Thi~ fig:are :ake~t ,rca. field rec!>rds ~tnd represents grost; barrel~, ru~, net barrels yet It° bi=. de,:erm~.ned, after adjus]:menti for temperature an.[ BS&W. SW TD Co ted 61 7/8" red **5552 Bbls No NoTm.--There were ........................ : ............. runs or sales of oil; .............................................. M au. f~. of gas sold; ............... _N_.o_ .......................... runs or sales of gasoline during the month. (Write "no" where applicable.) No~m.--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Form 9-829 (January 1950) 16--25766-9 U.S. GOYERH~ENT PRINTING OFFICE ])AN AMERICAN PETROLEUM COI PO ION P. O. Box 779 Anchorage, Alaska October 29, 1964 File: AEP-914-400.1 Re: Middle Ground Shoal No. 4 Alaska Division of Mines and Minerals c/o St. Mary's Residence 8th and L Street Anchorage, Alaska Attention: Mr. T. R. Marshall, Jr. Gentlemen: Attached please find an original and one copy of the Lessee's Monthly Report of Operations for the month of October and an original and two copies of Form P-3, Sundry Notices and Reports on Wells, setting out work performed' for the suspension of the shut-in oil well, Middle Ground Shoal No. 4. Completion Report will follow soon. A. E. Piper District Superintendent Fo~m P--3 ~ STAY~'OF ALASKA SUBMIT IN TRzp~E* (Other tnstruetio~ ~ re- OIL AND GAS' CO'r~SERVATION COMMISSION verse .Me) SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen or plug back to a different reservoir. Use "APPLICATION FOR PERMIT--" for such proposals.) Effective: July 1, 1964 §. LEASE DESIONATION AND SERIAL NO. ADL 17595 6. IF INDIAN, ALLOTTEE OR TRIBE NAME 7. UNIT 'AGREEMENT NAME OIL [~ GAS [~ WELL WELL OTHER 2. NAME OF OPERATOR Pan American Petroleum Corporation 8. ADDRESS OF OPERATOR P. O. Box 779, Anchorage, Alaska 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements.* See also space.17 below.) At surf, ce 591' E of W Line, 1971' S of N Line, Section 31, T9N, R12W, S.M. 15. Et~VATIONS (Show whether DF, RT, GB, RKB = + 75(Sea Level) = +86(MLL Tide) 14. PERMIT NO. 6476 16. 8. FARM OR LEASE NAME _ _ Middle. Ground Shoal State 9. WELT` NO. 4 10. FIELD AND[P00L,,OR WILDCAT . Middlle Ground, Shoal 11. 8EC~, ~.,-R:~.~M. OB BL~r, AND BURYB~ OR'AB~A SectiOn 31, T9N, R12W, S.M. 12. BOROUGH .. ' [ 18.. s~ 3rd 5ud' Di~[ ' Alaska Check Appropriate Box TO Indicate .Nature o~ Notice, Report, or Other Data. NOTICE OF INTENTION TO: TEST WATER SHUT-OFF I [ PULL OB ALTER CASING FRACTURE TREAT MULTIPLE. COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WET,r, CHANGE PLANS (Other) WATER SHUT-OFF ~ .: REFAIRINO· . WELT, FRACTURE TREATMENT ALTERING CASING' SHOOTING OR ACIDIZING ABANDONMENT~ (Other) Suspend ope~tion~ ,on Shut in  No~z: .Report' results of multiplaeompletion on' WeB ompletion or Reeompletion Rep0~ anaLog'form;) oil well 17. DESCRZRE PROPOSED OR coMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including, estimated date of.starting any proposed work. If well is directionally drilled, ~ive subsurface locations and measured and true vertical depths fo~ i~ll'markers Rna zones perti- nent to this work.) * ' ' ' This is a report of the suspension of operations on this SI oil well; operations to resume with the construction of a permanent platform and sales facilities. TD 9215, (PBTD 9156) 7" liner from 6935' to 9215', 7" casing tied into~.lin~r and extending to wellhead. Perforated and tested intervals 8400-60, 8805-65, 8070-8130, 7670-7730~ 7080- 7130, 6136-86, 5920-70, 5570-5620. Bridge plug 8350', cement plug 8240~8~50, bridgeplug 6900, cement plug 6792-6900, perf. 5570-5620, squeezed with 100 sx., bridge plug 5492, cement plug 5379-5492, production packer with plug 250'. 2 joints of tubing hung in tubing hanger with a back preSsure valve in lower joint, subsea wellhead installed and capped. SIGNED TITLE District Superintendent .. DATE Octobe~ 28, 1964 (This space for Fede~l or SJ~ate/oflles qse) CON ITIONS 0'F APPROVAL, IF ANY: DATE *See Instructions on Reverse Side UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY ~. ~.~ Form approved. Budget Bureau No. 42-R355.5. L^.v omc~ __A_._n_9__h.p_._r_.a_g.e__ ............ · .......... P.A, #186839 LESSEE'S MONTHLY REPORT OF OPERATIONS The followin~ is a correct report of operations and production (includinff drillin~ and prod~ci-~ff wells) for the month of ...... _S__e_~_t__e___m___b_B_r_ ............... , 19__6._4._, _ ............................................................................. /l ~ent' s address .... ?_:__~:____~___o__x____7__7__~ ................................... Company__~____--_------_-_.-Pan A~m2__~_i_~F~__~_.x~.Petroleum Corp. Anchorag'e, Alas ka Si$ned ..... --~~v------------------- ~, Phone .......... _~_..~.___~__-__~_4__0_.1__ ..... : .............................................. ~lger~t' s title ._D..i_.s__t_.r_~__c.t....S._~_r_.e_.r.~*.t..e..n..d..e-..n-t-. ....... SEC. AND SW 1/4 NW Sec. 31 TD 9, Zl! . 525 sac! s locator , 8,805' t tested ii ~ RA~ ~B 6' 'al No, -- 4 8, T O8( D&Y~ I.'i0. d' 9.9: sted ~to? BABRELS Or T e sting. .bs HR-4. P~foratei interval s 130'. ORAVITY __ 0 Set 7 an cu. F~. OF GAS (In thousands) ' Casing 6 CBL 9, 15~ :ested 8, 41 - 60 and ~ OALLONS OF OASOLINE RECOVERED 9~5' to - 2, 80 O' to 8,~ 805 - BARRELS OF WA~ER (If none, so state) None surface )'. Ran g60'. Pe 5 t0geth, .... i'I-~O?.AGE REMARKS (If drilling, d~th; if shut down, oause: date and result of trot for gasoline eontent'of gas) .nd cemented with gamma-Ra~ collar ~forated aiad tested ~r. Perforated' and No?~.--There were ............. ~P ..................... runs or sales of oil; ........ _~_Q ................................. M cu. ft. of gas sold; .................. ~__o_ ...................... runs or sales of gasoline during the month. (Write "no" where applicable.) NoTm.--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Form 9-$29 16--25766-9 U.S. ¢OyEnNMEtI? PRIt~TING OFFICE (January 1950) UNITED STATES DEPARTMENT~ OF THE INTERIOR GEOLOGICAL SURVEY Form approved Budget Bureau'No. A2-R356.5.~ ~o omc~ ..... .~xcko. r._ag_e. ....... ~,~ ._.~!~_~__._~_9_~__~_9_~1 ~ 4 LESSEE'S MONTHLY REPORT OF OPERATIONS The followinff is a correct report of operations and prod~ction (includinff drillinff and produein~ wells) for the month of ............. _A___~_g__u__s_t_ ............... , ff9._6_4_., ............................................................................ d fent's address ............ P__.~___O_ .... ._B__o~c_:7_Z9 .......................... Company ~__m~_~~?_._e_.t__:F__q_l_.e_~__.~_.9_~_P- Anc hot age, Alas ka Si fined ...... ~~ ........................ Phone ............................ _ .~__ .R_ _ _ _8. _-_ .6_ _4_ __0_ .1. .................................. /l ~ e n t ' s t i t l e . _D~.i. _c_t_ _ . _~. _u. ~p. .e_ .r_ i.n_ .t. .e. .n. _d. .e. . .n_ .t_ ...... ~ Or ~ TWP. RANGE WEI2~ DAWs CU. FT. O1? GAS GALLONS OF BARRE~ 0r REMARKS NO. ~ Paoouomo BAREE~ OF O~ GRA~TY (~ tho~ands) GASOLINE WATER (~ (If dri~, d~th: H shut down, ease: ~ECOVERED none, so state)date ~d rm~t of t~t for g~o~e ..... eon~t of SW 1/4 9 12 4 0 0 ~ 0 0 0 None 'w /4 cc. 31 D 9215. l~asling '~ver ~ish. Tested o;en hole in~erval 71 52-7456 below 9 5/8" casing. ore ~ 7366-~7'. [Core t3 7399-1410' Core ~4 7458-82 . Core t5 7522-47'. ore ~( 7f97-]610'. Core t7 7715-42' Core t8 8024-3,,'. Ran ~S 8144 to 715Z' ore ~:~ ~ ~i81-81!~6'. ~ore ~10.~600-15~. Core ~11 92~5-15'. Ran~S, GR-Sonic [icrol~ter~ log-cali)er~ ]Di:~pmeter,~ Denl ity Log 7158'-920~ '. Set 7" liner 6935-9215 w/1400 sks Cla s A + 1/2% Halad-9~ PUled DP to 5964 ant circ. 3 hrs. ~ipe stuck. is~ng. RECEIVED SI P 1 b DIVISION OF MINES ~ MIN~RA~ ~ ! ANCHO~Q E ................ NoTE.--There were ............ __n._g ..................... runs or sales of oil; ................... -~.g_ ...................... M cu. ft. of gas sold; ................ --n_9_ ........................ runs or sales of gasoline during the month. (Write "no" where applicable.) NebR.--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Form 9-829 (January 1950) 16--25766-9 LI, S, GOVERNMENT PRINTING OFFICE ~ ~- Budget Bureau No. 42-R356.5. UNITED STATES DEPARTMENT~ OF THE INTERIOR . ~ N~.~. .... ~L__!~9~ ........... MONTH OF OP State ..... &!_~_k_a .................. County __C_o_o_k__..I_p.]~e._t:___B__a__s__:L__n__. Field ....... The followin~ is a correct report of operations and prod~ction (including drillin~ and prod~cin~ wells) for tke ~ontk of ......... J!~l~ ......................... , 19_6_~__, ......................................................................... Jl~e~t--s address .......... B_o__:~___7__7__~)_ ............................................ Co~pany Phone ................._B_P~__~.-__6_~QJ~ ................................................ ~lffent' s ~EC. AND SW 1/4 NW Sec, 31 'ri) 7366 Density 2500 s× 7076 ~ ~ 5312', Set 9 5 7366', LL L __ __ 0 ! I rs BARRELS O~ OiL (~RAVITY I r~'"D I 0 0 11 !ed 17 1/2.~inch ag I~2' - :f065' ed 12 l/4-in~h ho~ - 7151'. T~ok 1' 24 , 6270', ~165' 12 , [ t '153' XB v~ 765 73,.0~ - 7364~o Cu. F~. or (]AS (In thousands) hole to 20~ e to 7200' , recOvere 6162' 59~ sx Class A covered 24! (~ALLONS OF (}ASOLINE I~ECOVERED ~5' ~8-inch Ran I~ 15 sid~ 0' 586C ~eet. BARRELS OF WA?ES (If none, so state) None lES, OK t 1987'. S, OR So wall cot ', 5585' Drilled REMARKS (If drilling, depth; if shut down, oause; date and result of test for geaolt,no content of eas) Ntcrola~eral, Cemented w/ ~ic, I~L~ Dipmeter, ;s: 7101' 7088' 5441' 5446 1/2' 8 $/8-inch hole to No?E.--There were ............ no ...................... runs or sales of oil; .................. O_P ......................... M cu. ft. of gas sold; .......... ~_Q ............................... runs or sales of gasoline during the month. (Write "no" where applicable.) · NO?E.--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Form 9-329 (January 1950) 16--25766-9 O. $. GOVERNMZNT PRINTIN; OFFICE FORM 470 2.57 PAN AMERICAN PETItOLEUM CORPOIb ION P. O. Box 779 Anchorage, Alaska July 21, 1964 File: AEP- 6552400.1 Re: Location Survey Plats Middle Ground Shoal Nos. 3 and 4 Wells. State of Alaska Department of Natural Resources Division of Mines and Minerals c/o St. Mary's Residence 8th and L Streets Anchorage, Alaska Attention: Mr. T. R. Marshall, Jr. Gentlemen: Reference is made to previous correspondence concerning Applications for Permits to Drill our Middle Ground Shoal Nos. 3 and 4 wells. Transmitted herewith are four 'location survey plats of the referenced wells for your file and information. Yours very~~ly, A. E. Pzper~ Di.strict Superintendent Attach. dis:lng UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY ~---"""'~. Form al)proved. Budget Bureau No. 42-R356.5. ......... P. LESSEE'S MONTHLY REPORT OF OPERATIONS The followin~ is a correct report of operations and production (inch, di~ff drillin~ and produein~ wells) for thee moT~t/~ of ......................... .J__~_e._ ....... , 19.6__~_, An¢ hora ge, AlaSka $i~nea ....... ~~~._]ji~.!. ..... : .............. - ;~;~,; ......................... ~--~t-:~-~~i- ............... --- .................... J~ent's title ....... _DJ ~_r__i_.c~____~_u_p__e_ r iht e ndent , . , I SEC. AND A I BARRELS OF OIL GRAVITY GALLONSGAsOLiNEOF BARREL,wATER (IfOr (If drilling, depth; if shut down. eaus~ ]4 or ]4 Twp- R NGE WELL DAxS (DU. FT. OF GAS REMARKS NO' PRODUOmD (II1 thousands) date and result of test for gasoline RECOVERED ll0no, sO state) content of gas) /4 9 lg 4 0 0 i 0 O 0 None . 31 i 1,05C*. !)rillLng. Spa~[ded 6-g4-b4.' [an ge" ca~ing in ~6" hole. Set at 1, U0$~ KI L00~ ~ CIi~ss ,[ an, l 500 ex Class .~ w/~% CaC1g. TOp of i 0" casir.g head 'landed: 35 ye m~d iir~e, Dist~nce lB to mud line ~ 188 feet and distance MLL water level line is !~g fa et. I A~C ~oRAG[ I ......................... SW NW TD .above mud No?r.--There were ................ _rAo .................. runs or sales of oil; .............. I1~_ .......................... M cu. fg. of gas sold; .................... _~_O_ .................... runs or sales of gasoline during the month. (Write "no" where applicable.) NO~E.--Report on ~his form is required for each calendar month, regardless of the stagus of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by ~he supervisor. Forxn 9-329 (January 1950) 16---25766-9 LI. S. GOVERNMENT PRINTING OFFICE UNITED STATES DEPARTMENT' OF THE INTERIOR GEOLOGICAL SURVEY Budget Bureau No. 42-R3~6.5. .,,,,,~ oF~,c~ ...... ~_~_c.~9___r_~g_9 L~,~,~ ,,..,,,,,,:,';, ...... UNIT _~M_i._d._d__l_~_..¢._r__o--]~_~rJ-_.-d-.-~--h-Q-~--1 $ ~ 4 P.A. # 186839 LESSEE'S MONTHLY REPORT OF OPERATIONS State ......... _ _A_.1_a_s__k__a__ ........... Oo zt ~ ty ._C_:o_ _~.k____~.__1__e__t___ _~__a_ _s_i_n___ Field ___W__ '_z_l__d___c__a__t_ ................................................... The [ollowir~ is a correct report of operations and prod~ction (i~cludin~ drilli~O and producin~ wells) for tAe month of ................................ ~-~--a-Lk_, 19_G_-4-_, ............................................................................... ./l~e~t'S address ....................._ _~_ _o_ _x_ _ _7_ 7_ ~_ ............................... Company ..... ~a rx,4a~~ ~__ ~_ _~_t r _Qi_e_~ __C o ............................................... ........ .... ................ P I~o n e ....... , ........................... _B__R__ _8__:.~__~_O_.i_ ........................... /l O e~ t s ti tl~.c._t_..S_B ~.e. ..r. '.l..n.t..9._n._d..e..n..t__ .... rp. ~EC. AND ~4o~ ~4 SW 1/4 NW 1/4 Sec. 31 ri'wP 9 C 12 [4 nstrkxcti PR 0 ~i 0 elf- contained Cu. F~. OF O~s (In thousands) latform or. GALLONS OF GASOLINE i~ECOYERED locatioz BARRELS OF none, so state) None REMARKS (If drilling, depth; if shut down, cause; date and result of test for gasoline content of gas) No?E.--There were ................ _n_o__ ................. runs or sales of oil; .............. __rl__o_ ........................... M cu. ft. of gas sold; , IlO runs or sales of gasoline during the month. (Write "no" where applicable.) No~E.~Report on this form is required for each calendar month, regardless of the s~atus of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Forln 9-8~9 (January 1950) 16--25766-9 u.S. GOVERNMENT pRINTINa OFFICE UNITED STATES DEPARTMENT' OF THE INTERIOR GEOLOGICAL SURVEY Form approved. Budget Bureau No. 42-R856.5. u,,~_~i~dLe_G~o_~&_S~l s ~4 ~.A. ~ 186839 LESSEE'S MONTHLY REPORT OF OPERATIONS State ......... ._A__l__a._s..k__.a_ ........... Cou~r~ty .C___o_.o__~_._I~__l_.e__t._~_B___a__s__i_n___ Fge~d .... _W___i__l__d__q_a__t_ ................................................ The followi~ is a correct report of operations a~d Prod~etio~ (i~cl~di~g drilli~ a~d produein~ wells) for tI~e montk of .......................... ~A*p~i~ ..... , 19_~_, .................................................................... ~ d~e~t's address ........._.B~_x_~__7___7__9_ ............... , .......................... Compa~u_~lP.¢_tm~gunm_Co rp. · Anchorage, ._A_!__~s__k__a_ ................... Signed_[~..~.~~/ ........................... Pkon~e ............... , ......... /~lq__ 8_-__6~01 ...... ~ .............................. ./l~er~t's ~ t ~~_ _S_.u_ p._e_.r__i_nt e nd e nt SEC. AND SW 1/4 NW 1/4 .Sec. 31 Sui TWP. 9 vey RANG] , .~ 12 WE: ~ 0 tion BARRELS OF OIL CU. FT. OF GAS GALLONS OF BARRELS or REMARKS (In thousands) GASOLINE WATER (~f (If drilling, depth; fflshut down, oause; RECOVERED none, so state)da~ ~d r~t of ~t for g~ol~e oontent of 0 0 None No~E.--There were .......... _~Q ....................... runs or sales of oil; ........... _ILQ ............................... M cu. ft. of gas sold; .................. ~_~_.o_ ...................... runs or sales of gasoline during the month. (Write "no" where applicable.) No?E.--Report on this form is required for each calendar month, regardless of the status of operations, and must be flied in duplicate with the supervisor bY the 6th of the succeeding month, unless otherwise directed by ~he supervisor. FOI'~I 9-329 16--25766-9 U, $. GOVERNMENT PRINTING OFFICE aanuarv 1Off0) ~ app:~ ~ b~tn8 b~ld pmat~ r~ce~t .~ tae ftlb~ fee. 8/63 MEMORANDUM State of Alaska ( TO: r P,.OSCOe E, Bell FRO~ .Thomas R. Mar~hall DATE : SUBJECT: March 25, 1964 ,Middle Ground $h~al ~4 Pan American Petroleum Corporation An application foz' permit to drill has been received from Pan Am~xican for a ~4 well neax Middle Gro~md $,hoal. An appllcation for £h~ir #3 ~S is -iu the mill but has not yet been received by this office, This is to notify you, for ~ own fr~or~t~n, a~ ~ tl~J~the. Cook Inlet Setmetters may be co~sulted by ywdr Divietom. The location will '~ approximately a m~le and a half p~r~h of Shell's MaS #1 oil discovery. Mr. Stanley will be interested C~t: mo use of tidelands is contemplated in conaectlon:,~ the drilling operation, T~ proposed lo~atton is 660' g o£ th~ west li~e amd 19~0' S of the N lime, Se~. 31, TgN-RIZW', $.M. This ~11 be' altered slightly when an actual murvey of the locaZion can be i afl:er the drillim~ ve~ssel has been secured. '~ " FORM 4'70 2-57 PAN AMERICAN PETnOLEUM CORPOIIATION o. RECEIVED AnchOrage, Alaska March 23, 1964 MAR 25 Filez AEP-240-WF Re: Permission to Drill Middle Ground Shoal State No. 4 Petroleum blvlslon of Mines ' ,erais · Alaska Dept. of t4~,~, ~;~ourcel Section 31, T9N, R12W, S.M. Cook Inlet Basin, Alaska State of Alaska Department of Natural Resources Division of Mines & Minerals 329 2nd Avenue Anchorage, Alaska Attention: Mr. T. R.-Marshall, Jr. Gentlemen: In accordance with Section 2051, Oil and Gas Regulations, we are transmitting herewith State Form P-l, a tentative plat showing well location and distances from Offsetting wells and lease lines, and a schematic of the blowout preventer equipment to be used on the subject well. An official surveyor's plat will be furnished ~o your office as soon as ice and weather conditions permit surveyin~'~ operations in the Inlet. / We understand from the published State regulationsi and past correspondence with your office that you require notification prior to: (a) Spud date (b) Date of installation of blowout prevention equipment. (c) Any change of plans approved by this Division (d) Abandonment or completion date. It is also understood that you would like to be notified immediately of any shows of oil or gas, or the moving of the drilling platform from the approved precise location. State of Alaska Department of Natural Resources Division of Mines & Minerals -2- March 23, 1964 Also, in addition to copies of the litholigic and electrical logs and monthly report of operations, it is understood you require a washed and dried sample cut. office. If there are any further requirements, please notify this Yours very~ A. E. Piper District Superintendent dis:lng Attach. CC: U,S.G.S. ?\ ,~TZ tl A/ T I O ?4 ff. ,4 ,¢ E,e ~ ¢,4/,/- - ,5 INCL4/,e. - F~/4'/zz'/,p..,f. lq,/v PA N ~ N~£z c4 h'- Plh II~ PS ~H~ C M IZ- 51~ELL I &Q_,AL~- In= 28L, /0/ .' / .,6, ,kb ,,', z:) z. 1876'4 - ~T4IFD4 .~'D ADI ! ?3-¢.4- 2 31 3rd Floor Box ?79 Anchorage, Al.a~ka Re: Middle Ground Shoal #4 l~a Am~riaaa Petroleum Dear above refereaced application for peraLt to trill coostated only a~ origtam! a~ on~ copy. Please ~ubmi~ another copy as 3 i~tcal f~ are ~aqutred. Very ~ruly yours, Thm~as R. tlarahal I, Sr. Peerol~ Geologist APPLICATION FOR PERMIT TO DRILL, D'EE, ....... · : APPLIC'AT, ION TO ,DRIL:L~]:' DEEPEN,:[[I NAME OF COMPANY OR OPEi%'.~T~R '~ : ~:~ Fan American Petroleum ~0,~'~:i~i/:i0~n'~' Address :: ~' :-: .... ~- ' ~ :"~;' ~ ?::i City r. 0. Box 779 Anchorag, '"~;:~ DESCRii~TION:"'0F. WELL"'AND':':~EASE ~, P[~UG BACK PLUG.: BACK?O '. DATE .,.. Name of lease Middle Ground Sh.o..a...1...S...ga~eI %VeiL.location _/giv, e footage from section lines) 1! q/,Tj~-t .~ Eof West li~-~.. 8 of North line Field & reservoir (lf wildcat, so state) ~er Tertiary: Middle Ground ~oai Distance, in miles, and direction from nearest town or post o~ice 45 miles SW of .~_ch_orage,__A!_a__s_k__a Nearest distance from proposed location to property or lease line: 3 '300 feet Ii'ell numberer [ S'/~Elevati°n.L~Ve ~(gr°und) Section township--range or bl~)ck & survey ~c~iOn 31i .T~., R1,2W, Sewat'd .Meridian county (~ook :I~let Basin) ' Distance from proposed location to nearest drilling, completed or applied--for well on the same lease: feet Proposed depth: 9,000' Number of acres in lease: 1'06 Rotary or cable tOols . I . ~tary $.-13-5~49 Approx. date work will stare Number of wells on lease, including this well. completed in or drilling to thts reservoir: If lease, purchased with one or more wells drilled, from Whom purchased: Not Applicable. Name Address Status of bond bead on file in Central Nati~tde .Bond lile - D.C. Remarks: (If this is an application to deepen or plug back, briefly describe work to be done, giving present producing zone and expected new producing zone) Ten~ative IocaCion plat attached. Approved survey plat will be su~t~ted'~ lich ~iil ~ prior ~o ~~ ~ location. ~e d~'iili~ and c~litt~ folios: Drill 26" hole to approxl~ly 9~~ amd set 20" conductor ~tll 17%".hole ~o approxi~ely 3,000~ ~d .se~ 13 3/8" su'~f~e e Drill 12%" hole to approx.~ely 7,000' ~d set 9 $/8" inte.~iate pipe sear top of ~r. Tertta~'~ ~ Drill 8 5/8" ~le ~o appr~i~tely 9,000' and set 7" p~uctl~ s, tri~ ~r~ ail ,1ere tvailable CEB~FICA~: I, ~e ~dersi~ed, state ~at I am the D[~. ~ of ~ ~, (comply), ~d ~at I ~ suborned by said comply ~ m~e ~ repo~; ~d ~at ~ repo~ was pre- pared under my supervision and direction and that the facts s~~~~e~ct ~d complete to the best of my knowledge. Signature A.C'Bo FX~ ~'' Permit Number: ~ ~ -- & , Approval Da e: · ! n >~ ~ / . See Instruction on Reverse Side of Form Alaska Oil and Gas Conservation Commission Application to Drill, Deepen or Plug Back Form No. P-1 Authorized by Order No. i Effective October 1, 195~ ]-