Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout204-2451. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Tubing Patch Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 19359'feet None feet true vertical 7175' feet 12490'feet Effective Depth measured 19359'feet 12242', 12262', 12501'feet true vertical 7175' feet 6879', 6889', 7006'feet Perforation depth Measured depth True Vertical depth Tubing (size, grade, measured and true vertical depth) 3-1/2"x 4-1/2" L-80 12560' MD 7033' TVD Packers and SSSV (type, measured and true vertical depth) 12242' MD 12262' MD 12501' MD 2314' MD 6879' TVD 6889' TVD 7006' TVD 1989' TVD 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: Alpine Oil Pool 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title:Contact Phone: 3085' 2364' Burst Collapse Production Open Hole 13348' 5977' Casing 7216' 6-1/8" 13382' 19359' 7175' 3048' 114'Conductor Surface Intermediate 16" 9-5/8" 77' measured TVD 7" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 204-245 50-103-20504 P.O. Box 100360 Anchorage, AK 99510 3. Address: ConocoPhillips Alaska, Inc. N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: ADL0380075, ADL0387212, Colville River Field/ Alpine Oil Pool CRU CD2-21 Plugs Junk measured Length measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 106 Gas-Mcf MD 460 Size 114' 1669 16541676 0 1500 248 N/A Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG 0 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. N/A Packer: PIIP Patch Packer Packer: PIIP Patch Packer Packer: Baker Premier Packer SSSV: Camco TRM-4E X Profile Nip (Locked out) Mark Shulman Mark.Shulman@conocophillips.com (907) 263-3782Senior Well Intervention Engineer Open Hole: 13382-19359' 7216- 7175' Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Grace Christianson at 12:13 pm, Sep 19, 2025 Mark Shulman Digitally signed by Mark Shulman Date: 2025.09.19 09:37:08 -08'00' J.Lau 11/6/25 RBDMS JSB 092525 DTTMSTJOBTYP SUMMARYOPS 9/6/2025 REPAIR WELL RIG UP FOR SLB ELINE CONVEYED PATCH LOWER PACKER SETTING W/ HAL DPU. WHILE RIH REALIZE RBP BELOW SETTING DEPTH HAS NOT BEEN PULLED. POOH AND RIG DOWN PENDING SLICKLINE OPERATION TO PULL RBP. 9/7/2025 REPAIR WELL EQUALIZED & PULLED 2.60" ME P2P RBP @ 12,474' RKB. READY FOR E-LINE. 9/7/2025 REPAIR WELL RIG UP FOR SLB ELINE CONVEYED PATCH LOWER PACKER SETTING W/ HAL DPU. SET LOWER PACKER AT 12265'. CCL TO MID ELEMENT = 11.5', CCL STOP DEPTH = 12253.5'. JOB COMPLETE, READY FOR SLICKLINE. 9/8/2025 REPAIR WELL SET UPPER 3.5" PIIP ME PACKER, 12.54' SPACER PIPE & ANCHOR LATCH (OAL = 20.83') @ 12,265' RKB (UPPER PACKER @ 12,242' RKB (20.03' CE TO CE). JOB COMPLETE. 9/13/2025 REPAIR WELL (AC EVAL) RE-TIFL POST PATCH (PASSED) CD2-21 Tubing Patch Summary of Operations Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason: Tubing Patchl CD2-21 9/8/2025 boehmbh Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread CONDUCTOR Insulated 34" 16 15.06 37.0 114.0 114.0 62.50 H-40 WELDED SURFACE 9 5/8 8.92 36.6 3,084.6 2,363.6 36.00 J-55 BTC PRODUCTION 7 6.28 34.6 13,382.2 7,216.2 26.00 L-80 BTCM OPEN HOLE 6 1/8 13,382.2 19,359.0 Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string Top (ftKB) 32.7 Set Depth … 12,560.0 Set Depth … 7,033.3 String Max No… 3 1/2 Tubing Description TUBING 4.5X3.5 @124' Wt (lb/ft) 9.30 Grade L-80 Top Connection EUE-mod ID (in) 2.99 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 32.7 32.7 0.10 HANGER 10.800 FMC TUBING HANGER 4.500 123.8 123.8 0.25 XO 4.5x3.5 4.500 TUBIING CROSSOVER 4.5x3.5" 2.992 2,314.2 1,989.3 59.68 SAFETY VLV 5.176 CAMCO TRM-4E X PROFILE NIP SSSV ; LOCKED OUT 10/3/15 CAMCO TRM-4E 2.812 5,435.4 3,545.2 58.09 GAS LIFT 5.390 CAMCO KBUG CAMCO KBUG 2.920 9,632.2 5,592.9 60.66 GAS LIFT 5.390 CAMCO KBUG CAMCO KBUG 2.920 12,330.2 6,922.0 60.34 GAS LIFT 5.390 CAMCO KBUG CAMCO KBUG 2.920 12,417.7 6,965.6 59.86 SLEEVE 4.260 BAKER CMD SLIDING SLEEVE w/2.813 'X' PROFILE BAKER CMD 2.813 12,500.6 7,006.3 61.92 PACKER 5.980 BAKER PREMIER PACKER BAKER PREMIE R 2.870 12,548.1 7,028.0 63.43 NIPPLE 3.750 HOWCO XN NIPPLE 2..81 POLISH BORE w/2.75 NO GO HOWCO XN 2.750 12,559.5 7,033.1 63.81 WLEG 4.500 WIRELINE GUIDE 3.000 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in) 7,248.5 4,463.2 60.88 PATCH PERM - UPR TOP Welltec Isealate Spring Blade Patch. OAL = 9.5' (8/20/24 caliper showed min ID 2.66") WellTec 8/18/2024 2.660 7,250.0 4,463.9 60.91 LEAK - TUBING Leak detected w/ Eline LDL 1/29/2024 2.992 7,258.0 4,467.8 61.03 PATCH PERM - LWR BOTTOM Welltec Isealate Spring Blade Patch Well Tec 8/18/2024 2.660 12,242.0 6,878.8 61.00 PACKER - PATCH - UPR Bottom PIIP 3-1/2" Medium Expansion; ALPMEP35004 9/8/2025 1.125 12,247.0 6,881.3 61.01 SPACER PIPE 1.9 NU 10 Rnd Spacer Pipe; ALPBSC125001, ALPAL287001 9/8/2025 1.370 12,250.0 6,882.7 60.99 LEAK - TUBING Leak detected w/Relay LDL 4/22/2025 2.992 12,262.0 6,888.5 60.90 PACKER - PATCH - LWR Bottom PIIP 3-1/2" Medium Expansion; ALPMEP35002 9/7/2025 1.125 12,490.0 7,001.2 61.59 FISH KOT TRAY 9/7/2005 0.000 12,545.2 7,026.8 63.34 CATCHER Catcher Sub set on GS 9/7/2005 0.000 Mandrel Inserts : excludes pulled inserts Top (ftKB) Top (TVD) (ftKB) Top Incl (°) St ati on No /S Serv Valve Type Latch Type OD (in) TRO Run (psi) Run Date Com Make Model Port Size (in) 5,435.4 3,545.2 58.09 1 GAS LIFT DMY BK 1 0.0 2/5/2005 3:30 0.000 9,632.2 5,592.9 60.66 2 GAS LIFT GLV BK 1 1,800.0 10/1/2005 1:00 0.188 12,330.2 6,922.0 60.34 3 GAS LIFT OV BK 1 0.0 4/22/2025 12:00 0.250 Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 13,382.2 7,216.2 87.86 OPEN HOLE 6.125 CD2-21, 9/15/2025 7:09:09 PM Vertical schematic (actual) OPEN HOLE; 13,382.2-19,359.0 PRODUCTION; 34.6-13,382.2 CATCHER; 12,545.2 FISH; 12,490.0 GAS LIFT; 12,330.2 PACKER - PATCH - LWR; 12,262.0 SPACER PIPE; 12,247.0 LEAK - TUBING; 12,250.0 PACKER - PATCH - UPR; 12,242.0 GAS LIFT; 9,632.2 PATCH PERM - LWR; 7,258.0 PATCH PERM - UPR; 7,248.5 LEAK - TUBING; 7,250.0 GAS LIFT; 5,435.4 SURFACE; 36.6-3,084.6 SAFETY VLV; 2,314.2 CONDUCTOR Insulated 34"; 37.0-114.0 WNS PROD KB-Grd (ft) 44.11 RR Date 2/8/2005 Other Elev… CD2-21 ... TD Act Btm (ftKB) 19,359.0 Well Attributes Field Name ALPINE Wellbore API/UWI 501032050400 Wellbore Status PROD Max Angle & MD Incl (°) 93.76 MD (ftKB) 19,237.43 WELLNAME WELLBORECD2-21 Annotation Last WO: End DateH2S (ppm) DateComment SSSV: TRDP Originated: Delivered to:11-Sep-25Alaska Oil & Gas Conservation Commiss11Sep25-NR        !"#$$%$ !&$$'($)*%+ ($)*%,-.WELL NAME API #SERVICE ORDER #FIELD NAMESERVICE DESCRIPTIONDELIVERABLE DESCRIPTION DATA TYPE DATE LOGGED3T-616 50-103-20899-00-00 224-138 Kuparuk River WL TTiX-FSI FINAL FIELD 30-Aug-253S-719 50-103-20919-00 225-058 Kuparuk River WL TTiX-HSD FINAL FIELD 3-Sep-25CD2-40 50-103-20464-00-00 203-126 Colville River WL Patch FINAL FIELD 7-Sep-25CD2-21 50-103-20504-00-00 204-245 Colville River WL Patch FINAL FIELD 7-Sep-25Transmittal Receipt//////////////////////////////// 0/////////////////////////////////  +  !  1 Please return via courier or sign/scan and email a copy to Schlumberger." 2"3 +45 %TRANSMITTAL DATETRANSMITTAL #1 67 8 " !  - +"  8#!(3 . 8 ) "3   8#!9 3   :   8"    +868 8  " 8#!;"   "  3 -  3 "  3""+      3   + < +3!%  T40870T40871T40872T40873CD2-2150-103-20504-00-00204-245Colville RiverWLPatchFINAL FIELD7-Sep-25Gavin GluyasDigitally signed by Gavin Gluyas Date: 2025.09.12 08:32:59 -08'00' Originated: Delivered to:7-May-25Halliburton Alaska Oil and Gas Conservation Comm.Wireline & Perforating Attn.: Natural Resource TechnicianAttn: Fanny Haroun 333 West 7th Avenue, Suite 1006900 Arctic Blvd. Anchorage, Alaska 99501Anchorage, Alaska 99518Office: 907-275-2605FRS_ANC@halliburton.comThe technical data listed below is being submitted herewith. Please address any problems orconcerns to the attention of the sender aboveWELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPE DATA TYPE LOGGING DATE PRINTS # DIGITAL # E SET#1 CD2-21 50-103-20504-00 909953586 Colville River Leak Detect Log Field- Final 22-Apr-25 0 12 CD2-21 50-103-20504-00 909953586 Colville RiverPlug Setting RecordField- Final 21-Apr-25 0 13 CD2-40 50-103-20464-00 909953481 Colville RiverMulti Finger CaliperField & Processed 10-Apr-25 0 14 CD2-40 50-103-20464-00 909953481 Colville RiverPacker Setting RecordField- Final 14-Apr-25 0 15 CD4-24 50-103-20602-00 909953393 Colville RiverLeak Detect LogField- Final 16-Apr-25 0 16 CD4-24 50-103-20602-00 909953479 Colville RiverPacker Setting RecordField- Final 6-Apr-25 0 17 CD4-24 50-103-20602-00 909953393 Colville RiverPacker Setting RecordField- Final 19-Apr-25 0 18 CD4-211 50-103-20538-00 909953392 Colville RiverPlug Setting RecordField- Final 11-Apr-25 0 19 CD4-211 50-103-20538-00 909953392 Colville RiverPlug Setting RecordField- Final 12-Apr-25 0 110PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518FRS_ANC@halliburton.comDate:Signed:Transmittal Date:204-245203-126209-097206-153T40368T40368T40369T40369T40370T40370T40370T40371T403715/8/2025Gavin GluyasDigitally signed by Gavin Gluyas Date: 2025.05.08 10:16:03 -08'00'204-245CD2-2150-103-20504-00 909953586Colville RiverLeak Detect LogField- Final22-Apr-25012CD2-2150-103-20504-00 909953586Colville RiverPlug Setting RecordField- Final21-Apr-2501 1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Isealate Patch Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 19359'feet None feet true vertical 7175' feet 12490'feet Effective Depth measured 19359'feet 12501'feet true vertical 7175' feet 7006' feet Perforation depth Measured depth True Vertical depth Tubing (size, grade, measured and true vertical depth) 4-1/2" x 3-1/2" L-80 12560' MD 7033' TVD Packers and SSSV (type, measured and true vertical depth) 12501' MD N/A 706' TVD N/A 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: Alpine Oil Pool 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title: Contact Phone: 3085' 2364' Burst Collapse Production Open Hole Casing 7216' 6-1/8" 13382' 19359' 114'Conductor Surface Intermediate 16" 9-5/8" measured TVD 7" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 204-245 50-103-20504-00-00 P.O. Box 100360 Anchorage, AK 99510 3. Address: ConocoPhillips Alaska, Inc. N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: ADL0380075, ADL0387212 Colville River Field/ Alpine Oil Pool CRU CD2-21 Plugs Junk measured Length measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 143 Gas-Mcf MD 900 Size 114' 1875 17191256 0 2120 200 N/A Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG 0 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. N/A Packer: Baker Premier Packer SSSV: Camco TRM-4E X Profile NIP (Locked Out) Mark Shulman mark.shulman@conocophillips.com (907) 263-3782Senior Well Interventions Engineer None None Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Grace Christianson at 8:00 am, Oct 22, 2024 DTTMSTART JOBTYP SUMMARYOPS 6/13/2024 ACQUIRE DATA MOVE EQUIPMENT FROM CD2-45, SPOT EQUIPMENT, LAY DOWN PCE BASKET, PREPARE FOR WELLTEC RUNS, PERFORM PT, LAY DOWN AND STANDBY FOR WELLTEC DAY SHIFT NEXT MORNING 6/14/2024 ACQUIRE DATA RIH WITH WELLTEC WBH TOOL TO CLEAN PATCH SETTING AREA RIH WITH WELLTEC DRIFT TOOL TO CAPTURE PRESSURE AND TEMPERATURE DATA FOR PATCH SET PARAMETERS, LOG COMPLETED, POOH, INSTALL NIGHT CAP, STANDBY TO CONTINUE OPERATIONS NEXT MORNING 6/15/2024 ACQUIRE DATA JOB CONTINUE, DECIDED BY WELLTEC THAT INSTALLING PATCH AT CURRENT WELL TEMPERATURE WOULD NOT BE SUITABLE. DETEMINED TO CANCEL PATCH SETTING RUN. RIGGED DOWN, AND MOVE OUT TO CHANGE OUT CABLE FOR NEXT RUN. *** JOB PAUSED FOR NOW *** 8/17/2024 REPAIR WELL RIG UP FOR SLB ELINE CONVEYED WELLTEC ISEALATE PATCH. SET ISEALATE PATCH FROM 7248.5' TO 7258'. CCL TO TOP OF PATCH = 32.8', CCL STOP DEPTH = 7215.7'. STANDBY FOR PATCH TO SET. ***JOB IN PROGRESS*** 8/18/2024 REPAIR WELL ***JOB CONTINUED FROM 17-AUG-2024*** CONTINUE STANDING BY FOR PATCH TO SET. PATCH SET, PULL UPHOLE FREELY. POOH AND RIG DOWN ELINE. JOB COMPLETE, READY FOR SLICKLINE CONVEYED 24 ARM CALIPER. 8/20/2024 REPAIR WELL RAN 24 ARM CALIPER f/ 12,495' RKB TO SURFACE. JOB COMPLETE. 10/5/2024 REPAIR WELL (AC EVAL) SI RE TIFL PASSED CD2-21 Isealate Patch Summary of Operations Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By Last Tag: 12,760.0 CD2-21 9/7/2005 WV5.3 Conversion Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason: Set Welltec Spring Blade Patch CD2-21 8/18/2024 boehmbh Notes: General & Safety Annotation End Date Last Mod By NOTE: TREE: FMC 4-1/16" 5K - TREE CAP CONNECTION: 7" OTIS 2/7/2005 WV5.3 Conversio n Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread CONDUCTOR Insulated 34" 16 15.06 37.0 114.0 114.0 62.50 H-40 WELDED SURFACE 9 5/8 8.92 36.6 3,084.6 2,363.6 36.00 J-55 BTC PRODUCTION 7 6.28 34.6 13,382.2 7,216.2 26.00 L-80 BTCM OPEN HOLE 6 1/8 13,382.2 19,359.0 Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string Top (ftKB) 32.7 Set Depth … 12,560.0 Set Depth … 7,033.3 String Max No… 3 1/2 Tubing Description TUBING 4.5X3.5 @124' Wt (lb/ft) 9.30 Grade L-80 Top Connection EUE-mod ID (in) 2.99 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 32.7 32.7 0.10 HANGER 10.800 FMC TUBING HANGER 4.500 123.8 123.8 0.25 XO 4.5x3.5 4.500 TUBIING CROSSOVER 4.5x3.5" 2.992 2,314.2 1,989.3 59.68 SAFETY VLV 5.176 CAMCO TRM-4E X PROFILE NIP SSSV ; LOCKED OUT 10/3/15 CAMCO TRM-4E 2.812 5,435.4 3,545.2 58.09 GAS LIFT 5.390 CAMCO KBUG CAMCO KBUG 2.920 9,632.2 5,592.9 60.66 GAS LIFT 5.390 CAMCO KBUG CAMCO KBUG 2.920 12,330.2 6,922.0 60.34 GAS LIFT 5.390 CAMCO KBUG CAMCO KBUG 2.920 12,417.7 6,965.6 59.86 SLEEVE 4.260 BAKER CMD SLIDING SLEEVE w/2.813 'X' PROFILE BAKER CMD 2.813 12,500.6 7,006.3 61.92 PACKER 5.980 BAKER PREMIER PACKER BAKER PREMIE R 2.870 12,548.1 7,028.0 63.43 NIPPLE 3.750 HOWCO XN NIPPLE 2..81 POLISH BORE w/2.75 NO GO HOWCO XN 2.750 12,559.5 7,033.1 63.81 WLEG 4.500 WIRELINE GUIDE 3.000 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in) 7,248.5 4,463.2 60.88 ISO-SLEEVE Welltec Isealate Spring Blade Patch. OAL = 9.5' Welltec 8/18/2024 2.710 7,250.0 4,463.9 60.91 LEAK - TUBING Leak detected w/ Eline LDL 1/29/2024 2.992 12,490.0 7,001.2 61.59 FISH KOT TRAY 9/7/2005 0.000 12,545.2 7,026.8 63.34 CATCHER Catcher Sub set on GS, FISHING KOT TRAY 9/7/2005 0.000 Mandrel Inserts : excludes pulled inserts Top (ftKB) Top (TVD) (ftKB) Top Incl (°) St ati on No /S Serv Valve Type Latch Type OD (in) TRO Run (psi) Run Date Com Make Model Port Size (in) 5,435.4 3,545.2 58.09 1 GAS LIFT DMY BK 1 0.0 2/5/2005 0.000 9,632.2 5,592.9 60.66 2 GAS LIFT GLV BK 1 1,800.0 10/1/2005 0.188 12,330.2 6,922.0 60.34 3 GAS LIFT DMY BK 1 0.0 12/31/2023 0.000 Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 13,382.2 7,216.2 87.86 OPEN HOLE 6.125 CD2-21, 9/9/2024 5:46:06 PM Vertical schematic (actual) OPEN HOLE; 13,382.2-19,359.0 PRODUCTION; 34.6-13,382.2 CATCHER; 12,545.2 FISH; 12,490.0 GAS LIFT; 12,330.2 GAS LIFT; 9,632.2 ISO-SLEEVE; 7,248.5 LEAK - TUBING; 7,250.0 GAS LIFT; 5,435.4 SURFACE; 36.6-3,084.6 SAFETY VLV; 2,314.2 CONDUCTOR Insulated 34"; 37.0-114.0 WNS PROD KB-Grd (ft) 44.11 RR Date 2/8/2005 Other Elev… CD2-21 ... TD Act Btm (ftKB) 19,359.0 Well Attributes Field Name ALPINE Wellbore API/UWI 501032050400 Wellbore Status PROD Max Angle & MD Incl (°) 93.76 MD (ftKB) 19,237.43 WELLNAME WELLBORECD2-21 Annotation Last WO: End DateH2S (ppm) DateComment SSSV: TRDP Originated: Delivered to:12-Sep-24 Alaska Oil & Gas Conservation Commiss 12Sep24-NR ATTN: MeredithGuhl 333 W. 7th Ave., Suite 100 600 E 57th Place Anchorage, Alaska 99501-3539 Anchorage, AK 99518 (907) 273-1700 main (907)273-4760 fax WELL NAME API # SERVICE ORDER # FIELD NAME SERVICE DESCRIPTION DELIVERABLE DESCRIPTION DATA TYPE DATE LOGGED CD2-58 50-103-20457-00-00 203-085 Colville River WL SBHPS-RBP FINAL FIELD 16-Aug-24 CD2-21 50-103-20504-00-00 204-245 Colville River WL Patch FINAL FIELD 18-Aug-24 CD2-467 50-103-20579-00-00 208-114 Colville River WL Patch FINAL FIELD 20-Aug-24 1B-07 50-029-20616-00-00 181-089 Kuparuk River WL MechCutter FINAL FIELD 24-Aug-24 2A-11 50-103-20057-00-00 186-003 Kuparuk River WL Isealate Patch FINAL FIELD 27-Aug-24 3F-11 50-029-21482-00-00 185-272 Kuparuk River WL IPROF FINAL FIELD 29-Aug-24 2A-20 50-103-20196-00-00 193-151 Kuparuk River WL IPROF FINAL FIELD 30-Aug-24 3F-20 50-029-22947-00-00 199-079 Kuparuk River WL IPROF FINAL FIELD 2-Sep-24 3J-18 50-029-22701-00-00 196-147 Kuparuk River WL Lee-PPROF FINAL FIELD 3-Sep-24 2U-12 50-029-21304-00-00 185-041 Kuparuk River WL PPROF FINAL FIELD 4-Sep-24 1D-39 50-029-22997-00-00 200-216 Kuparuk River WL Punch-Cut FINAL FIELD 9-Sep-24 2P-448A 50-103-20396-01-00 202-005 Kuparuk River WL Punch FINAL FIELD 10-Sep-24 2P-432 50-103-20420-00-00 202-091 Kuparuk River WL Punch FINAL FIELD 11-Sep-24 2P-434 50-103-20467-00-00 203-153 Kuparuk River WL Punch FINAL FIELD 11-Sep-24 Transmittal Receipt ________________________________ X_________________________________ Print Name Signature Date Please return via courier or sign/scan and email a copy to Schlumberger. Nraasch@slb.com SLB Auditor - TRANSMITTAL DATE TRANSMITTAL # A Delivery Receipt signature confirms that a package (box, envelope, etc.) has been received. The package will be handled/delivered per standard company reception procedures. The package's contents have not been verified but should be assumed to contain the above noted media. # Schlumberger-Private T39555 T39556 T39557 T39558 T39559 T39560 T39561 T39562 T39564 T39565 T39566 T39567 T39668 T39563 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.09.13 08:31:59 -08'00' CD2-21 50-103-20504-00-00 204-245 Colville River WL Patch FINAL FIELD 18-Aug-2 T39556 C:\Users\grgluyas\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\R97USUAM\2024-08-24_16004_CRU_CD2-21_CaliperSurvey_LogData_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 16004 CRU CD2-21 50-103-20504-00 Caliper Survey w/ Log Data 20-Aug-24 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ _____________________________________ Date received Signature ______________________________ ______________________________________ PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM 204-245 T39482 8/26/2024 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.08.26 10:04:49 -08'00' C:\Users\kmjunke\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\H2LGR515\2024-02-02_23013_CRU_CD2-21_CaliperSurvey_LogData_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 23013 CRU CD2-21 50-103-20504-00 Caliper Survey w/ Log Data 02-Feb-24 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM PTD: 204-245 T38504 2/15/2024 Kayla Junke Digitally signed by Kayla Junke Date: 2024.02.15 09:26:57 -09'00' TTT RR AA NN SS MM II TT TT AA LL FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 333 W. 7 th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: AOGCC WNS wells Geochem request 12/6/2022 DATE: 01/11/2023 Transmitted: North Slope, Colville River Unit, Alaska Via SFTP ___AOGCC WNS wells Geochem request email 12/6/2022 Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com CC: wells e-transmittal well folder Receipt: Date: Alaska/IT-Support Services |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512 By Meredith Guhl at 10:28 am, Jan 19, 2023 194-026 T37450 191-147 T37451 196-006 T37452 195-020 & 204-245 T37453 Meredith Guhl Digitally signed by Meredith Guhl Date: 2023.01.19 10:37:44 -09'00' - STATE OF ALASKA AIL OIL AND GAS CONSERVATION COMAION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other:Scale Inhibitor Treatment ❑., 2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number: ConocoPhillips Alaska, Inc. Development ❑✓ Exploratory ❑ 204-245 3.Address: Stratigraphic ❑ Service ❑ 6.API Number: P.O. Box 100360,Anchorage,AK 99510 50-103-20504-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL 380075, 387212 CRU CD2-21 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): None Colville River Field/Alpine Oil Pool 11.Present Well Condition Summary: Total Depth measured 19359 feet Plugs measured None feet true vertical 7175 feet Junk measured 12490 feet Effective Depth measured 19359 feet Packer measured 12501 feet true vertical 7175 feet true vertical 7006 feet Casing Length Size MD TVD Burst Collapse Structural SCANNED (1 _� Coonductor 77' 16" 114' 114' Nov�V �G 201? Surface 3048' 9.625" 3085' 2364' Intermediate Production 13348' 7" 13382' 7216' Liner RECEIVED Perforation depth Measured Depth: Open Hole Completion, 13382'- 19359' MD SEP 012017 True Vertical Depth: 7216'-7175'TVD AOGCC Tubing(size,grade,measured and true vertical depth) 4.5"x 3.5", L-80, 12560'MD, 7033'TVD Packers and SSSV(type,measured and true vertical depth) Packer: Baker Premier Packer, 12501'MD, 7006'TVD SSSV: Camco TRM-4E locked out and iso sleeve set, 2314' MD, 1989'TVD 12.Stimulation or cement squeeze summary: Intervals treated(measured): 13382'- 19359' MD Treatment descriptions including volumes used and final pressure: Please see attached summary 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 361 281 809 1211 211 Subsequent to operation: 396 199 870 1224 207 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations C7 Exploratory❑ Development 2 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Q Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Kaylie Plunkett Email Kaylie.B.Plunkettcop.com Printed Name Kaylie Plunkett Title Production Engineer Signature /. / 1 t i Phone 265-6450 Date 8-3 0- 17 yin - /°J ' / 3' Form 10-404 Revised 5/2015 s 2U i7 Submit Original Only /O/� 7 • • CD2-21 Scale Inhibition Treatment 8/7/17—8/8/17 Hybrid Scale Inhibitor Squeeze Job pumped from 08:15 hrs on 8/7/17 to 14:00 hrs on 8/8/17. LRS= Little Red Services - Initial pressure TBG/IA/OA—915/1167/167 - LRS pumped 218 bbls Diesel/EC9610A/M209 preflush at 2.1 bpm,TBG/IA/OA-1412/1143/173 - LRS pumped 218 bbls Seawater/EC6089A scale inhibitor main treatment at 2.1 bpm,TBG/IA/OA —888/1117/167 - LRS pumped 2343 bbls Dead Crude/M209 overflush at 2.0—3.0 bpm,TBG/IA/OA— 2005/1089/169 Interval treated: 13,382'—19,359' MD a©y - 245 ConocoPhillips RECEIVED AUG 3 1 2016 Transmittal #1178 Detail AOGCC Date: 8/30/2016 To (External Party): From (CPAI Contact): Email*: meredith.guhl@alaska.gov Email*: richard.e.elgarico@conocophillips.com First Name*: Meredith First Name*: Ricky Last Name*: Guhl Last Name*: Elgarico Phone 907 793-1235 Phone Number: 907 265-6580 Number: Company: AOGCC Company: ConocoPhillips Address: 333 W. 7th Ave. Address: 700 G Street City: Anchorage City: Anchorage State: AK State: AK Zip Code: 99501 Zip Code: 990501 Transmittal Info Sent Via: email Tracking #: SCANNED SEP 0 6 2016 Justification: Compliance Data Detail Quantity*: Description*: Type*: 1 CD2-21PB1 MWD log data TAP 3007'-20170' MD Attachments: Signature: Date: WIAQ-- M -r I( I U9 Approver: Signature: Date: STATE OF ALASKA AlIll<A OIL AND GAS CONSERVATION COMION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other:Scale Inhibitor Treatment ❑., 2.Operator Name: 4.Well Class Before Work: 5. Permit to Drill Number: ConocoPhillips Alaska, Inc. Development Q Exploratory ❑ 204-245 3.Address: Stratigraphic ❑ Service ❑ 6.API Number: P.O. Box 100360,Anchorage,AK 99510 50-103-20504-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL 380075, 387212 CRU CD2-21 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): None Colville River Field/Alpine Oil Pool 11.Present Well Condition Summary: Total Depth measured 19359 feet Plugs measured None feet true vertical 7175 feet Junk measured 12490 feet Effective Depth measured 19359 feet Packer measured 12501 feet true vertical 7175 feet true vertical 7006 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 77' 16" 114' 114' Surface 3048' 9.625" 3085' 2364' RECEIVED Intermediate Production 13348' 7" 13382' 7216' JUN 15 2016 Liner °' Perforation depth Measured Depth: Open Hole Completion, 13382'- 19359'MD A0GCC True Vertical Depth: 7216'-7175'TVD SCANNED DEC 0 obt Tubing(size,grade,measured and true vertical depth) 4.5"x 3.5", L-80, 12560' MD, 7033'TVD Packers and SSSV(type,measured and true vertical depth) Packer: Baker Premier Packer, 12501' MD, 7006'TVD SSSV: Camco TRM-4E locked out and iso sleeve set, 2314' MD, 1989'TVD 12.Stimulation or cement squeeze summary: Intervals treated(measured): 13382'- 19359' MD Treatment descriptions including volumes used and final pressure: Please see attached summary 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 278 190 1039 1304 204 Subsequent to operation: 234 7 440 1945 217 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations E Exploratory❑ Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Q Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Kerry Freedman Email Kerry.C.Freedmanaa cop.com Printed Name Kerry Freedman Title Principal Production Engineer Signature Phone 265-6579 Date 4 //Li 1/L 4' VIL /if Pt- Form JLForm 10-404 Revised 5/2015 ry RBDMS 1Y JbK. 1- 2016 Submit Original Only • CD2-21 Scale Inhibition Treatment 5/16/16 Hybrid Scale Inhibitor Squeeze Job pumped 5/16/16 from 07:00 to 21:30 hrs. LRS= Little Red Services - Initial pressure TBG/IA/OA—797/1569/183 - LRS pumped 218 bbls Diesel/WAW5206/M209 preflush at 2 bpm,TBG/IA/OA- 1696/1587/181 - LRS pumped 218 bbls Seawater/SCW3001 scale inhibitor main treatment at 1.7-2 bpm, TBG/IA/OA—997/1630/180 - LRS pumped 675 bbls Dead Crude/M209 overflush at .5—2 bpm,TBG/IA/OA—1696/2264/185 Interval treated: 13,382'—19,359' MD WNS PROD • CD2-21 lir- ConocOP fillipsIII') Well Attributes Max Angle&MD TD Alaska Inc Wellbore API/UWI Field Name Wellbore Status ncl("I MD(ftKB) Act Btm(ftKB) 501032050400 ALPINE PROD 93.76 19,237.43 19,359.0 •-• su Comment H2S(ppm) Date Annotation End Date KB.Grd(ft) -Rig Release Date CD2-21,5/21/201611:46:50 AM SSSV:TRDP Last WO: 44.11 2/8/2005 Vertical schematic(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date Last Tag: 12,760.0 9/7/2005 Rev Reason:PULL AND SET ISO SLEEVE pproven 5/21/2016 HANGER.32 7- Casing Strings Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread CONDUCTOR 16 15.062 37.0 114.0 114.0 62.50 H-40 WELDED 1111 - 111. Insulated 34" IL C Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread • SURFACE 95/8 8.921 36.6 3,084.6 2,363.6 36.00 J-55 BTC Casing Description 00(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(L..Grade Top Thread e PRODUCTION 7 6.276 34.6 13,382.2 7,216.2 26.00 L-80 BTCM 11. I Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread OPEN HOLE 6 1/8 13,382.2 19,359.0 Tubing Strings _suk Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(TVD)(...Wt(lb/ft) Grade Top Connection TUBING 31/2 2.992 32.7 12,560.0 7,033.3 9.30 L-80 EUE-mod CONDUCTOR Insulated 34"; 4.5X3.5 @124' 37.0-114.0 Completion Details Nominal ID Top(866) Top(TVD)(ftKB) Top Incl('1 Item Des Com (in) 32.7 32.7 0.10 HANGER FMC TUBING HANGER 4.500 • 123.8 123.8 0.25 XO 4.5x3.5 TUBIING CROSSOVER 4.503.5" 2.992 • 2,314.2 1,989.3 59.68 SAFETY VLV CAMCO TRM-4E X PROFILE NIP SSSV;LOCKED OUT 2.812 10/3/15 12,417.7 6,965.6 59.86 SLEEVE BAKER CMD SLIDING SLEEVE w/2.813'X'PROFILE 2.813 ISO SLEEVE;2,314.0 !RI 12,500.6 7,006.3 61.92 PACKER BAKER PREMIER PACKER 2.870 SAFETY VLV;2,314.21 ( ��Iif! 12,548.1 7,028.0 63.43 NIPPLE HOWCO XN NIPPLE 2..81 ID w/2.75 NO GO 2.750 12,559.5 7,033.1 63.81 WLEG WIRELINE GUIDE 3.000 Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) Top(TVD) Top Incl Top(ftKB) (ftKB) I°) Des Corn Run Date ID(in) • 2,314.0 1,989.2 59.68 ISO SLEEVE 2.81"ISO SLEEVE(2.81"X-LOCK&ISO SLEEVE 5/20/2016 1.720 (OD=2.7871D=1.727 OAL=50') - 12,490.0 7,001.2 61.59 FISH KOT TRAY 8/6/2012 0.000 Mandrel Inserts SURFACE:36.630846 St at) on Top(TVD) Valve Latch Port Size TRO Run N Top(MB) )ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Corn 5,435.4 3,545.2 CAMCO KBUG 1'GAS LIFT DMY BK 0.000 0.0 2/5/2005 GM LIFT;5,435.4 ,. 2 9,632.2 5,592.9 CAMCO KBUG 1 GAS LIFT GLV BK 0.188 1,800.0 10/1/2005 3 12,330.2 6,922.0 CAMCO KBUG 1 GAS LIFT OV BK 0.313 0.0 5/13/2016 Notes:General&Safety End Date Annotation 2/7/2005 NOTE:TREE: FMC 4-1/16"5K-TREE CAP CONNECTION:7"OTIS 8/30/2010 NOTE:View Schematic w/Alaska Schematic9.0 I GAS LIFT;9,632.2 GAS LIFT;12,330.2 SLEEVE;12,417.7 '� FISH;12,490.0 PACKER',12,5006i 411 NIPPLE;12,548.1 WLEG;12,5595 PRODUCTION;34.6-13,362.2 - OPEN HOLE;13,382.2-19,359.0 • STATE OF ALASKA AL ,A OIL AND GAS CONSERVATION CON, SION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Performed Abandon r Repair w ell r Plug Perforations r Perforate rOther Scale Inhibitor Alter Casing r Pull Tubing r Stimulate-Frac Waiver r Treatment r r Time Extension Change Approved Program rOperat. Shutdown r Stimulate-Other r Re-enter Suspended Well r 2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number: ConocoPhillips Alaska, Inc. Development Exploratory r 204-245 3.Address: 6.API Number: P. O. Box 100360,Anchorage,Alaska 99510 Stratigraphic r Service r 50-103-20504-00 7 Property Designation(Lease Number): 8.Well Name and Number: ADL 380075,387212 CRU CD2-21 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10 Field/Pool(s): none Colville River Field/Alpine Oil Pool 11.Present Well Condition Summary: Total Depth measured 19359 feet Plugs(measured) none true vertical 7175 feet Junk(measured) 12490 Effective Depth measured 19359 feet Packer(measured) 12501 true vertical 7175 feet (true vertical) 7006 Casing Length Size MD TVD Burst Collapse CONDUCTOR 77' 16" 114' 114' SURFACE 3048' 9.625" 3085' 2364' PRODUCTION 13347' 7" 13382' 7216' RECEIVED APR 30 2015 Perforation depth Measured depth: open hole completion from 13382'-19359' ASV00C True Vertical Depth: 7216'-7175' SCANNED imAY 1 2 20i5 Tubing(size,grade,MD,and ND) 3.5, L-80, 12560 MD, 7033 TVD Packers&SSSV(type,MD,and ND) PACKER-BAKER PREMIER PACKER @ 12501 MD and 7006 TVD SSSV-CAMCO TRM-4E SSSV @ 2314 MD and 1989 ND 12.Stimulation or cement squeeze summary: Intervals treated(measured): 13382'- 19359' Treatment descriptions including volumes used and final pressure: see attached summary 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 399 192 _ 945 1415 223 Subsequent to operation 223 164 1064 1284 214 14.Attachments 15.Well Class after work: Copies of Logs and Surveys run Exploratory r Development J Service E Stratigraphic r 16.Well Status after work: Oil r Gas r VVDSPL r Daily Report of Well Operations XXX GSTOR r W1NJ r WAG r GINJ P SUSP r SPLUG r- 17. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C O Exempt none Contact Kerry Freedman C ,265-6579 Email Kerry.C.Freedman(a�conocophillips.com Printed Name Kerry Freedman Title Principal Production Engineer Signature f / n Phone:265-6579 Date t/ho it s - z.2 v'TL .5-/6//5- RBDMS J APR 3 0 2015 A f2 ' Form 10-404 Revised 10/2012 Submit Original Only a WNS CD2-21 ConocoPhillips 01 Well Attributes Max Angle&MD TD Alaska,IncWellbore API/UWI Field Name Well Status Incl(°) MD(MB) Act BEn(RKB) 501032050400 ALPINE PROD 93.76 l 19,237.43 19,359.0 Comment H2S(ppm) Date Annotation End Date KB-Ord(ft) Rig Release Date • -CD2-21,10/30/20126:25,47 AM Well Confer: SSSV:TROP Last WO: 44.11 2/8/2005 Schematic-Actual Annotation Depth(RKB) End Date Annotation Last Mod...End Date Last Tag: 12,760.0 9/72005 Rev Reason:WELL REVIEW osborl 10/29/2012 Casing Strings Casing Description String 0... String ID...Top(RKB) Set Depth(f...Set Depth(TVD)...String Wt...String...String Top Thrd CONDUCTOR 16 15.062 I ) 62.50 H-40 WELDED HANGER,33 - insulated 34" Casing Description String 0... StringID...TopRKB Set Depth(I...Set Depth(TVD)...'String Wt..String...String Top Thrd 11119 H PIP SURFACE i g/80 i8.921ID 36.6(5KB 3,084.6th( 2,363.6pth 36.00 J-55 BTC Casing Description String 0... String ID...Top(RKB) Set Depth(f...Set Depth(ND)...String Wt..String...String Top Thrd PRODUCTION 7 6.276 34.6 13,382.2 7,216.5 26.00 L-80 BTCM iiiii.. Casing Description String 0... String ID...Top(RKB) Set Depth(f...Set Depth(ND)...String Wt..String... String Top Thrd OPEN HOLE 61/8 13,382.2 19,359.0 Tubing Strings „. Tubing Description String 0... String ID...Top(RKB) Set Depth(f...Set Depth(ND)...String Wt...String... String Top Thrd TUBING 31/2 2.992 32.7 12,560.0 7,031.9 9.30 L-80 EUE-mod 4.5X3.5 @124' CONDUCTOR Completion Details Insulated 34', x. Top Depth 37-114 (ND) Topincl Nomi... Top(RKB) (R") (1 Rem Description Comment ID(in) 1111 32.7 32.7 0.25 HANGER FMC TUBING HANGER 4.500 123.8 123.8 0.25 XO 4.5x3.5 TUBIING CROSSOVER 4.5x3.5" 2.992 --__.. 2,314.2 1,989.2 59.70 SAFETY VLV CAMCO TRM-4E SSSV 2.812 12,417.7 6,965.5' 59.33 SLEEVE BAKER CMD SLIDING SLEEVE w/2.813'X'PROFILE 2.813 SAFETY VLv, o l 12, 500.6 7,006.1 61.89 PACKER BAKER PREMIER PACKER 2.870 23u f 12,548.1 7,025.9 62.55 NIPPLE HOWCO XN NIPPLE 2..81 ID w/2.75 NO GO 2.750 12,559.5 7,031.6 63.06 WLEG WIRELINE GUIDE 3.000 Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) Top Depth (ND) Top Incl Top(RKB) (MB) (1 Description Comment Run Date ID(In) L 12,490.0 7,000.9' 61.54 FISH KOT TRAY 8/6/2012 0.000 SURFACE, Notes:General&Safety 37-3,085 End Date Annotation 2!72005 NOTE:TREE:FMC 4-1/16"5K-TREE CAP CONNECTION:T OTIS r— 8/30/2010 NOTE:View Schematic w/Alaska Schematic9.0 GAS LIFT. 5.435 GAS LIFT,_ 9.632 GAS LIFT. 1 2.330 SL12,418 EEVE. 1 i■ , 11 FISH,12,480 PACKER, 12,601 NIPPLE,12.548 rli Mandrel Details Top Depth Top Port (TVD) Inel OD Valve Latch Size TRO Run' Stn_Top(MB) (RKB) el Make Model (in) go, Type Type (in) (psi) Run Date Com... WLEG,12.560-- 1 5,435.4 3,544.9 57.52 CAMCO KBUG 1 GAS LIFT DMY BK 0.000 0.0 2/5/2005 2 9,632.2 5,592.9 60.66 CAMCO KBUG 1 GAS LIFT GLV BK 0.188 1,800.0 10/1/2005 3'12,330.2 6,922.0 60.34 CAMCO KBUG 1 GAS LIFT OV BK 0.250 0.0 10/1/2005 1 PRODUCTION. , 3513,382 OPEN HOLE. e 13,382-19.359\ TO(CD2-21), \ — 19,359 CD2-21 Scale Inhibition Treatment 3/30/15—3/31/15 Aqueous Scale Inhibitor Squeeze Job pumped from 3/30/15 16:45 to 3/31/15 12:00. LRS= Little Red Services ACF=Alpine Central Facility - Initial pressure TBG/IA/OA—204/1331/137 - ACF pumped 30 bbls seawater preflush from seawater injection system at .1 bpm—2.9 bpm, TBG/IA/OA-408/1296/137 - LRS pumped 21.8 bbls WAW5206 at.3 bpm while ACF pumped 196.1 bbls seawater at 2.8 bpm, TBG/IA/OA-776/1251/131 - LRS pumped 33 bbls SCW3001 scale inhibitor at .5 bpm while ACF pumped 186 bbls seawater at 2.8 bpm -2.9 bpm,TBG/IA/OA—1033/1250/129 - ACF pumped 2251 bbls seawater overflush at 1.9 bpm—2.4 bpm,TBG/IA/OA- 1016/2127/129 Interval treated: 13,382'—19,359' · . Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ 0 lJ- - Q.. ~S Well History File Identifier Organizing (done) ~wo-sided 1111111111111111111 o Rescan Needed 1111111111111111111 RES CAN ""Calor Items: D Greyscale Items: DIGITAL DATA OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Diskettes, No. D Other, NolType: o Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: o Other:: mf Is~"1I111I 11111I111 vnf BY: ~ Date 1f-/I~1 07 /5/ Project Proofing BY: ~ Date 4/¡!}-.'O 7 & X 30 = I f5 0 Date: 4-/ J a- /07 + f I = TOTAL PAGES I q J (Count does not include cover sheet)v1A..P /5/ , r ~ 11/11111111111 1111I Scanning Preparation BY: ~ Production Scanning Stage 1 Page Count from Scanned File: 19 ~:. (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: VYES Date:lfJ id-/Dl If NO in stage 1 page(s) discrepancies were found: NO Stage 1 YES /5/ Mf NO 15/ 1IIII11111I111111I1 BY: ~ BY: Maria Date: Scanning is complete at this point unless rescanning is required. ReScanned 11111111I111111111I BY: Maria Date: 15/ Comments about this file: Quality Checked 11111111111I111111I 10/6/2005 Well History File Cover Page.doc STATE OF ALASKA ALASK~L AND GAS CONSERVATION COMMIS~1 REPORT OF SUNDRY WELL OPERATIONS t Operations Performed: Abandon "" Repair w ell ~"'" Plug Perforations Stimulate ~` Other ~' Alter Casing ~" Pull Tubing Perforate New Pool Waiver Time Extension Change Approved Program ""` Operat. Shutdow n ~ Perforate "" Re-enter Suspended Well '" 2. Operator Name: 4. Current Well Status: Permit to Drill Number: ConocoPhillips Alaska, Inc. Development r Exploratory "" 204-245 3. Address: Stratigraphic j"' Service .API Number: P. O. Box 100360, Anchorage, Alaska 99510 50-103-20504-00 7. roperty Design~on: 8. Well Name and N~nber: ADL 380075, 387212 ` CD2-21 9. Field/Pool(s): Colville River Field /Alpine Oil Pool 10. Present Well Condition Summary: Total Depth measured 19359 feet Plugs (measured) None true vertical 7175 feet Junk (measured) 12465 Effective Depth measured 19359 feet Packer (measured) 12501 true vertical 7175 feet (true vertucal) 7006 Casing Length Size MD ND Burst Collapse CONDUCTOR 77 16 114 114' SURFACE 3048 9.625 3085 2364' PRODUCTION 13345 7 1 3 382 7216' tt((~~j/~ )(~ yg ~ Y~~J'"ALS~~ IYt~~~l~ /3 t. /UI~.,I ~.. ~ \~',C~~~I~® ' ' MAR 0 ~ 20 Perforation depth: Measured depth: open hole completion from 13382 -19359 10 True Vertical Depth: 7216'-7175' Alaska Qjl ~ G as Cons. COmmtSS10R Anchorage Tubing (size, grade, MD, and ND) 3.5, L-80, 12560 MD, 7033 TVD Packers &SSSV (type, MD, and ND) PACKER -BAKER PREMIER PACKER @ 12501 MD and 7006 TVD TRDP - CAMCO TRM-4E SSSV @ 2314 MD a nd 1989 ND 11. Stimulation or cement squeeze summary: Intervals treated (measured): SE@ attachment Treatment descriptions including volumes used and final pressure: 12. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1024 2123 139 -- 258 Subsequent to operation 552 2265 124 -- 261 13. Attachments 1~A. Well Class after proposed work: Copies of Logs and Surveys run ` Exploratory °"" Development Service . Well Status after work: Oil ~' Gas WDSPL Daily Report of Well Operations XXX GSTOR ;'"`' WAG "` GASINJ WINJ SPLUG 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: none contact Tim Schneider ~ 265-6859 Printed Name Tim Schneider Title Staff Production Engineer Signature ~~-~ Phone: 265-6859 Date 3 ~ ~~ Form 10-404 Revised 7/2009 RBDMS MAR 0 31010~~'n'1 /`__ Submit Original Only a • CD2-21: Job pumped 2350 on 2-9-10 to 920 am 2-10-10. Hybrid squeeze; 35 bbls pre & post flush crude oil with WAW 5206 (578 gal) @ 3 bpm/800 psi; 253 bbls SW/SCW-3001WC (1595 gal) @ 3 bpm/vacuum; 1469 bbls dead crude @ 3.5 bpm. Well waS on a vacuum until 400 bbls into the overflush; then treating pressure increased to 1000 psi. Well SI for 20 hrs. after squeeze before returning to production. J"yyE 4 J r . :.: ; f ~y /Y /~ 99 +~ +y ~.~y/~~ I fusiN~ ~D2-2 t..~...-- API: 50103 (o-1za, OD:4.500. SSSV Type: TRDP ID:3.958) SURFACE Annular Fluid: (0-3085, OD:9.625, wf:3s.oo) Reference Log: 36' Rk Last Tag: 12760 n~awc Last Tag Date: ~ 9/7/20 (1zs-lzsso, OD:3.500, Casin Strin ALL ST 9 9 - ID:2.992) Description PRODUCTION S U R FAC E ALPINE Well Type:', PROD Orig Completion: 2/8/2005 Last W/O: o~~i ooo, PRODUCTION 7.000 0 13382 ~ 7216 wf:2s.ao) CONDUCTOR 16.000 0 114 114 Gas Lift andrellDummy Valve 1 (5435-5436, OD5.390) i Gas Lift Mandrel/Valve 2 (9632-9633, Gas Lift Mandrel/Valve 3 ;12330-12331, OD:5.390) SLEEVE ;12418-12419, OD:4.260) PACKER ;12501-12502, OD.5.980) NIP ;12548-12549, OD:3.750) W LEG ;12559-12560, OD:4.500) OPEN HOLE 6.125 13382 19359 1935 tubing String -TUBING Size Top Bottom TVD Wt 4.500 0 124 124 12.60 3.500 125 12560 7033 9.30 3as Lift Ma St MD ndrels/Valves TVD Man Mfr Man Type ~, V Mfr V Type V OD Latch 1 '. 5435 I 3545 ~ CAMCO KEUG DMY 1.0 BK 2 9632 5593; CAMCO KEUG GLV 1.0 BK 3 12330 6922' CAMCO KBUG OV 1.0 'I BK CD2-21 Angle @ TD:' 94 deg @ 19359 Rev Reason: TAG, GLV C/O, FISH Last Update: 3/8/2006 __ Wt ' Grade Thread __.36.00 J-55 ~ BTC D H_-40 WELDI ~ __ I Thread IBTM EUEMOD TRO ~ Date ~ V 124 I 124 XO TUBING CROSSOVER _... _ _ 3.ouu 2314 ', 1989 SSSV CAMCO TRM-4E SSSV -CLOSED 2/5/2005 _.. 2.812 12418 ', 6966 ' SLEEVE BAKER CMD SLIDING SLEEVE _. 2.813_ 12501 ~ 7006 PACKER BAKER PREMIER PACKER __ ~ 2.870 _ 12548 7028 ~ NIP HOV'JCO'XN' NIPPLE 2.750 12559 7032 ! WLEG WIRELINE GUIDE __ _ 3.000 Fish -FI s SH ___.: .~_ Depth Description _,_ _,, ,,~;_. Comment 12465 KOT TRAY _ General Notes _- - - _ Date - ~ Note _. 2/7/2005 TREE: FMC 4-1/16" SK TREE CAP CONNECTION: 7" OTIS OPEN HOLE ;13382-19359, OD:6 125) • • ~.. ~~ ;. -• ~ 03~0~ zoos DO N4T PLACE .,.,: ,,~ ANY NEW MATERIAL UNDER THIS PAGE F:~LaserFiche\CvrPgs_InsertslMicrofilm I~Zarker.doc e . ConocriPí,illips èXJ'-\- 'ð-\.\ S" Casing Detail 9518" Surface Casina Well: CD2-21 Date: 12/29/2004 DEPTH Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS Doyon 19 RKB to Landing Ring ~MAl U':JlW' 36,64 FMC Gen V Hanger 2.23 36.64 Jts 3 to 75 73 Jts 9-5/8" 36# J-55 BTC Csg 2957.07 38.87 Weatherford Float Collar 1.46 2995.94 Jts 1 to 2 2 Jts 9-5/8" 36# J-55 BTC Csg 84.96 2997.40 Ray Oil Tools "Silver Bullet" Float Shoe 2.24 3082.36 3084.60 TO 12 1/4" Surface Hole 3094.60 RUN TOTAL 42 BOWSPRING CENTRALlZERS- 1 per jt on Jt #1 - #12 (stop ring on Jt #1 & 2 ) and over collars on jts# 14, 16, 18,20,22, 24, 26, 28, 30, 32,34,36,38,40,42,44,46,48,50,52,54,56,58,60,62 64,66,68,70,72. 80 joints in the pipe shed. Run 75 joints - 5 joints stay out ~ ~ " ","",,- /' ",\, ":~\.'J ~\\I-'~~\')W' r\-- a--\ "- ~ \ , \ IlfA C\);j-- 4 a '-\ ~\) \C-A.:..).j~+ \ . , \ \J'-Q'-( VG ¡d-UO" - l } Q (~ \, '- I rr;.- ( -----' Use Best-o-Life 2000 pipe dope MU torgue - 8600 ftllbs Remarks: Up Wt-160 k On Wt - 132 k Block Wt - 75k Supervisor: D. Lutrick / L. Hill Cement Detail Report CD2-21 Surface Casing Primary Job Type ROT - DRILLING Start Date 12/26/2004 Spud Date ûementitíletáíls Description Cementing Start Date Wellbore Name Surface Casing 12/30/200407:15 CD2-21 Comment Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water wI nut plug for marker wI rig pump - Switch over to Dowell - Pumped 5 bbls water - Tested lines to 2500 psi - Dropped bottom plug - Mixed & pumped 50 bbls Mud Push XL spacer@ 10.5 ppg @ 5.6 bpm @ 175 psi - Mix & pump Lead slurry(AS3lite) @ 10,7 ppg @ 7.0 bpm @ 227 psi - Observed nut plug @ shakers wI 323 bbls lead slurry pumped - pumped down tub - total of 343 bbls lead (434 sks)- Mixed & pumped Tail slurry (Class G wI .20% D46, ,30% D65, 2% S001) 50 bbls (239 sks) @ 15,8 ppg @ 5.5 bpm @ 300 psi - Dropped top plug wI 20 bbls water fl Dowell - Switched over to rig pumps & displaced cement w/212 bbls 9,6 ppg mud @ 7 bpm @ 490 to 560 psi for first 204 bbls displacement - slowed pumps to 3.5 bpm for last 8 bbls @ 540 psi - Bumped plug w/1120 psi - Floats held - CIP @ 0852 hrs. Full returns throughout job wI 140 bbls 10.7 ppg cement returns to surface, Description Cement Casing Q (start) (bbl/min) 7 Depth tagged (ftKB) 0.0 P (final) (psi) 540.0 Bottom (ftKB) 3,085.0 P (bump) (psi) 1,120,0 Depth Plug Drilled Out To (ftKB) Comment Cement Found Between Shoe and Collar (Y/N): N Cement found on liner tool (Y/N): N Annular flow after cement job (Y/N): N Pressure before cementing (psi): 290 Hours circulated between stages: 2.25 Bbls cmt to surf: 140 Method used to measure density: Densometer Method used for mixing cement in this stage: tub Returns (pet): 100 Time cementing mixing started: 07:15 Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) FLUSH Biozan water wI nut 0 40.0 plug Yield (ft'/sack) Mix H20 Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) 0.00 0.00 0.00 8.30 0.00 0.0 Additives Additive Type Concentration Conc Unit label Fluid Fluid Type Pumped (bbl) FLUSH MUDPUSH XL 50.0 Yield (ft'/sack) Mix H20 Ratio (gallsa... Free Water (%) Density (Ib/gal) Thickening Time (hrs) CmprStr 1 (psi) 0.00 0,00 0,00 10,50 0.00 0,0 Additives Additive Conc Unit label Fluid Type Top (ftKB) Est Btm (ftKB) LEAD AS Lite 0.0 2,585,0 434 Yield (ft'/sack) Mix H20 Ratio (gallsa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) 4.45 20.70 0.00 10,70 0.00 Additives Additive Type Concentration Conc Unit label D-44 ACCELERATOR 9.0 % BWOW Additive Type Concentration Conc Unit label S1 ACCELERATOR 1,5 % Additive Type Concentration Conc Unit label D-46 DEFOAMER 0.6 % Page 1/32 Report Printed: 5/1/2007 Primary Job Type DRILLING SUPPORT-CAPITAL Additives Additive D-65 Additive D-79 Additive D-124 Additive D-53 Ce Flu Fluid Type TAIL Yield (ft'/sack) 1,17 Additives Additive S1 Additive D-46 Additive D-65 Cement Detail Report CD2-21 Job Category Well Intervention AFE / RFE Start Date 10045957 3/15/2005 Spud Date Concentration 0.5 Concentration 1.5 Concentration 50.0 Concentration 30.0 Surface Casing End Date 3/15/2005 Conc Unit label % Conc Unit label % Conc Unit label % Conc Unit label % Fluid Description Mix H20 Ratio (gal/sa... 5.10 Estimated Top (ftKB) 2,585.0 Free Water (%) 0.00 Type DISPERSANT Type EXTENDER Type FILLlTE Type GYPSUM Est Btm (ftKB) 3,085,0 Density (Ib/gal) 15,80 Amount (sacks) 239 Plastic Viscosity (cp) Type ACCELERATOR Type DEFOAMER Type DISPERSANT Page 2/32 Class G Thickening Time (hrs) 0.00 Concentration 1.0 Concentration 0,2 Concentration 0,3 Volume Pumped (bbl) 48.0 CmprStr 1 (psi) 0.0 Conc Unit label % Conc Unit label % Conc Unit label % Report Printed: 5/1/2007 Security level: Development Daily Drilling Report CD2-21 Report Number: 5 .---:- -. -*-:.. . Rig: Report Date: 12/30/2004 Well bore I Well Type Field Name I Spud Date I DFS (days) I Depth Start (ftKB) I Depth End (ftKB) I Depth Progress (ft) CD2-21 PB1 Development ALPINE 12/28/2004 3.00 3,095,0 3,095.0 0.00 AFE / RFE / Maint.# I Daily Mud Cost Cummulative Mud Cost Daily Cost Total Tcummulative Cost I Total AFE + Sup Amount 10045956 410,638,00 867,611.00 6,150,867.00 Last Casing String Next Casing OD (in) I Next Casing Set Depth (ftKB) Open Hole, 19,359,OftKB Ops and Depth @ Morning Report I ~4hr Forecast Picking up 5"" DP. Recovered pipe wrench first run PU DP and BHA RIH & Drill shoe track. Last 24hr Summary Ran casing and circulated, Cemented 95/8"" casing. Tested casing. Nippled down riser. NU and Tested BOP. PU and RIH reversing basket. General Remarks I ~eather I Head Count Temp 22 Wind SE 7 MPH, 47.0 I --- ~~ D. LutricklL. Hill Supervisor 00:00 02:15 2,25 SURFAC CASE RUNC P 131.0 1,977.0 RIHw/95/8"" 36#J-55 BTC csgfrom 131'to 1977'. 02:15 02:45 0,50 SURFAC CASE CIRC P 1,977,0 1,977.0 Circ 1 csg volume, Stage pumps up to 5 bpm at 320 psi. Up wt 130k. Dn wt 115k. 02:45 04:00 1.25 SURFAC CASE RUNC P 1,977,0 3,085.0 RIH w/9 5/8"" csg from 1977' to 3048'. MU hanger. Land csg at 3085', Up wt 160k. Dn wt 120k, 04:00 04:30 0.50 SURFAC CASE RURD P 3,085.0 3,085,0 RD Franks fill up tool. MU cement head. RU lines. 04:30 06:30 2.00 SURFAC CEMENT CIRC P 3,085.0 3,085,0 Circ and condition mud. Stage pumps up to 6.5 bpm at 290 psi. 06:30 06:45 0.25 SURFAC CEMENT SFTY P 3,085,0 3,085.0 PJSM on cementing csg with all personnel. 06:45 08:30 1,75 SURFAC CEMENT PUMP P 3,085,0 3,085,0 Rig pumped 40 bbls biozzanl nutplug spacer. Dowell tested lines to 2500 psi. Dropped bottom plug. Dowell pumped 50 bbls 10.5 ppg mudpush, 343 bbls 10.7 ppg lead cement and 50 bbls 15.8 ppg tail cement. 08:30 09:00 0.50 SURFAC CEMENT DISP P 3,085.0 3,085.0 Dropped top plug, Dowell pumped 20 bbls H20. Rig pumped 212 bbls mud. Bumped plug. Floats OK. 140 Bbls. cement to surface. CIP @ 0852 Hrs. 09:00 09:45 0.75 SURFAC CASE DEQT P 0.0 0,0 Test csg to 2500 psi for 30 min. 09:45 10:45 1,00 SURFAC CASE RURD P 0.0 0,0 RD csg equip, landing jt and long bails. 10:45 13:30 2,75 SURFAC CASE NUND P 0,0 0.0 Nipple down riser. 13:30 16:00 2.50 SURFAC CASE NUND P 0,0 0.0 Changed swivel packing and nippled up BOP. 16:00 20:30 4,50 SURFAC WELCTL BOPE P 0.0 0.0 Test BOPE - Hydril to 250 & 3500 psi - Pipe rams, choke & kill line valves, choke manifold valves, IBOP and floor valves to 250 & 5000 psi - performed accumutator closure test. Witiness of test by AOGCC waived by John Crisp. Pulled test plug and set wear bushing. 20:30 22:00 1,50 SURFAC FISH PULD T 0.0 0,0 Picked up and diagramed fishing basket. 22:00 23:00 1.00 SURFAC DRILL PULD P 0.0 900.0 Picked up DP from pipe shed and RIH, 23:00 23:30 0.50 SURFAC RIGMNT RSRV P 900,0 900.0 Serviced rig and top drive. Spud Mud 2,369.0 9,65 290 26.0 55,000 30.012 61,025 66,027 30,0 8,5 6,5 Latest BOP Test Data , uate I - , I Page 1/2 Report Printed: 5/1/2007 Stg No. Description Top (ftKB) Bottom (ftKB) 1 Cement Casing 0,0 3,085.0 FLUSH 0 40.0 8.30 0.00 FLUSH 0 50,0 10.50 0.00 LEAD 434 343,0 10,70 4.45 TAIL G 239 48.0 15,80 1.17 Daily Drilling Report CD2-21 12/30/2004 String Surface, 3,085.0ftKB Page 2/2 Security level: Development Report Number: 5 Report Date: 12/30/2004 Cement Evaluation Results Bond log run (Y/N): N Remedial cement required (Y/N): N Pressure used to test shoe (psi): 17.5 Test pressure (psi): 2500 Test time (hrs): 30 Top of cement sufficient (Y/N): Y Q (end) (bbll... P (final) (psi) 3 540.0 0.0 2,585.0 2,585,0 3,085,0 Report Printed: 5/1/2007 PRESSURE INTEGRITY TEST CONOCOPHllUPS Alaska, Inc. ell Name: Mud Weight: Mud 10 min Gel: Test Pressure: Rotating Weight: Blocks/Top Drive Weight: Estimates for Test: Mud Weight: Mud 10 min Gel: Rotating Weight: Blocks/Top Drive Weight: Desired PIT EMW: Estimates for Test: :::: + 0.052 x TV!) EMW at 3085 Ft-MD 3000 2500 2000 W I:t: :::;) en en 1500 w I:t: Q. 1000 500 Barrels """'IiPooCASING TEST ........LEAK-OFF TEST Shut-in Pressure, psi 920 _____________________n_____n___ Lost 25 psi during test, held 99% of test pressu re, 3 5 10 20 25 30 Shut-In time, Minutes PIT Point e e ConocJ"Phillips Casing Detail Well: Date: CD2-21 1/26/2005 DEPTH Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS Doyon 19 RKB 34.64 FMC Gen V Hanger 1.68 34.64 Jts 3 to 313 311 Jts 7" 26# L-80 BTCM Csg 13255.57 36.32 Davis Lynch Float Collar 1.32 13291,89 Jts 1 to 2 2 Jts 7" 26# L-80 BTCM Csg 86,88 13293.21 Ray Oil Tools "Silver Bullet" Float Shoe 2,15 13380.09 13382.24 TO 81/2" Hole 13395.00 Total Centralizers: 113 Stop Rings: 40 Straight blade centralizer one per jt on jts # 1-15 Straight blade centralizer one per jt on jts. # 239,2240,241 Straight blade cent. one every other joint #'s 243 - 269 Straight blade cent. 2 per jt w/ stop ring in middle of jt #'s 271 - 311 320 joints in shed - 313 total jts. to run 7 jts. Out Use JET LUBE Run & Seal pipe dope MU torque - 7900 ftllbs Remarks: Up Wt - k On Wt -155 k Block Wt - 75k Supervisor: D. Lutrick L. Hill Cement Detail Report CD2-21 Intermediate Casing/Liner Description Intermediate CasinglLiner Comment Wait on cement (hrs): 4 Cemented 7" casing as follows: Pumped 5 bbls CW100 - Test lines to 3700 psi - Pumped 45 bbls Cw100 @ 8,3 ppg 5.5 bpm @ 500 psi. Pumped 40 bbls Mud Push XL 10.5 ppg @ 5.5 bpm 1550 psi - Dropped bottom plug - Mix & pumped 44.6 bbls of Class G wI 0.2% D46, 0.3% D65, 0.40% D167, .1% B155 @ 15,8 ppg 5,2 bpm I 560 psi Dropped top plug wI 20 bbls water fl Dowell Switched to rig pumps & displaced wI 494 bbls of 9.8 ppg LSND mud - @ 6 - 3.5 bbls/min - 440 to 500 psi - plug not bumped CIP @ 1800 hrs. Floats did not hold. Good returns while cementing. Cementing Start Date 1/26/200516:10 Spud Date Primary Job Type ROT - DRILLING Job Category DRILLING CD2-21 Description Cement Casing Q (start) (bbllmin) 5 Depth tagged (ftKB) Comment Cement Found Between Shoe and Collar (Y/N): N Cement found on liner tool (Y/N): N Annular flow after cement job (Y/N): Y Pressure before cementing (psi): 580 Hours circulated between stages: 3 Bbls cmt to surf: 0 Method used to measure density: Densometer Method used for mixing cement in this stage: RCM Returns (pet): 100 Time cementing mixing started: 16:10 Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) FLUSH CW100 0 50.0 Yield (ft'/sack) Mix H20 Ratio (gallsa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) 0,00 0,00 0.00 8,30 0.00 0,0 Additives Additive Concentration (bbl) Spacer MUDPUSH XL 0 40.0 Yield (ft'/sack) Mix H20 Ratio (gallsa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) 0.00 0,00 0,00 10.50 0,00 0.0 Additives Additive Type Conc Unit label Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) TAIL 12,176,0 13,382.0 215 G 44.6 Yield (ft'/sack) Mix H20 Ratio (gallsa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) 1.16 5.09 0.00 15,80 0.00 0.0 Additives Additive Type Concentration Conc Unit label B155 0.07 % Additive Type Concentration Conc Unit label D167 0.4 % Additive Type Concentration Conc Unit label D-46 DEFOAMER 0,2 % Additive Type Concentration Conc Unit label D-65 DISPERSANT 0.3 % Page 1/32 Report Printed: 5/1/2007 Security level: Development Daily Drilling Report CD2-21 Report Number: 24 .' ~ ·1Ii_.-" . Rig: Report Date: 1/18/2005 Well bore ¡Well Type I Field Name I Spud Date I DFS (days) I Depth Start (ftKB) I Depth End (ftKB) I Depth Progress (ft) CD2-21 PB1 Development ALPINE 12/28/2004 22,00 20,171.0 20,171.0 0.00 AFE / RFE / Maint.# I Daily Mud Cost Cummulative Mud Cost Daily Cost Total Icummulative Cost ¡Total AFE + Sup Amount 10045956 107,557.00 3,851,826.00 6,150,867,00 Last Casing String Next Casing OD (in) I Next Casing Set Depth (ftKB) Open Hole, 19,359.0ftKB Ops and Depth @ Morning Report I ~4hr Forecast Picking up BHA. MU BHA #5, Sidetrack and drill, Last 24hr Summary RIH, Set 2 abandonment plugs and one KO plug. POOH laying down excess DP, General Remarks I Weather I Head Count 46,0 III mIiiEIII,,'I: IIIiI.i il II iIii'iIii;¡¡ii iI .H~ V. Johnson Engineer 00:00 00:30 0,50 INTRM1 ABANDN TRIP P 19,623.0 20,095.0 RIH to 20,095' with tubing tail. 00:30 02:00 1.50 INTRM1 ABANDN CIRC P 20,095,0 20,095.0 CBU @ 450 GPM 1270 PSI. 02:00 03:00 1.00 INTRM1 CEMENT PLUG P 20,095.0 20,095.0 Set balanced plug from 20,095' to 19,341'. Mixed and pumped 63 Bbls CI G @ 15,8 PPG. 20 Bbls water ahead + 3 behind. Displaced with 324 Bbls. mud @ 10 BPM. 03:00 05:00 2.00 INTRM1 ABANDN TRIP P 20,095,0 18,850.0 POOH to 18,850'. 05:00 06:00 1,00 INTRM1 ABANDN CIRC P 18,850.0 18,850.0 Pumped 40 bbls of high vis (gel) pill - displaced to equalization 06:00 06:30 0,50 INTRM1 ABANDN TRIP P 18,850.0 18,478.0 POOH to 18,478'. 06:30 08:00 1,50 INTRM1 ABANDN CIRC P 18,478.0 18,478.0 Circulated and conditioned mud 500 GPM 1620 PSI. 08:00 09:00 1,00 INTRM1 CEMENT PLUG P 18,478.0 18,478.0 Set balanced plug from 18,478' to 17,722'. Mixed and pumped 48 Bbls CI G @ 15.8 PPG. 20 Bbls water ahead + 3 behind. Displaced with 299 Bbls. mud @ 10 BPM. 09:00 10:00 1.00 INTRM1 ABANDN TRIP P 18,478.0 17,272.0 POOH to 17,272'. 10:00 10:30 0.50 INTRM1 ABANDN CIRC P 17,272.0 17,272.0 Circulated 40 Bbls of mud to clear tubing 10:30 16:00 5.50 INTRM1 ABANDN TRIP P 17,272.0 9,093,0 POOH to 9093' - pumped 40 bbls of high vis (gel) pill - displaced to equalization 16:00 16:15 0.25 INTRM1 ABANDN TRIP P 9,093.0 8,712,0 POOH to 8712'. 16:15 17:00 0.75 INTRM1 CEMENT PLUG P 8,712.0 8,712,0 Set balanced plug from 8,712' to 8,108'. Mixed and pumped 53 Bbls CI G @ 17 PPG, 25 Bbls water ahead + 3 behind, Displaced with 129 Bbls. mud @ 12 BPM. 17:00 17:30 0,50 INTRM1 CEMENT TRIP P 8,712,0 8,108.0 POOH to 8108'. 17:30 19:30 2.00 INTRM1 CEMENT CIRC P 8,108,0 8,108.0 CBU 500 GPM 740 PSI. 19:30 20:00 0.50 INTRM1 CEMENT TRIP P 8,108,0 7,629.0 POOH to 7,629' and observed well. Pumped dry job. 20:00 00:00 4.00 INTRM1 CEMENT TRIP P 7,629,0 3,080.0 POOH laying down DP to 3,080'. Glydril <Description?> - Started tœ 1/18/2005 Type I Wellbore I String Cement Evaluation Results plug CD2-21 Stg No. Description Top (ftKB) Bottom (ftKB) Q (end) (bbl/... P (final) (psi) 1 Kick-Off Plug 12 0.0 Stg No. Description Top (ftKB) Bottom (ftKB) Q (end) (bbl/... P (final) (psi) 2 Abandonment Plug 12 0.0 Latest BOP Test Data YY Ii Ii iiiiEii IIiII,i ,,',"'., iEY'YYi iç;pm~' iiE I Page 1/2 Report Printed: 5/1/2007 Daily Drilling Report CD2-21 Top (ftKB) Page 2/2 Bottom (ftKB) Security level: Development Report Number: 24 Report Date: 1/18/2005 Q (end) (bbll... P (final) (psi) 10 0,0 Report Printed: 5/1/2007 '!I PRESSURE INTEGRITY TEST CONOCOPHllllPS Alaska, Inc. I Name: Hole Size: 8-1/2" RKB-CHF: ing shoe test results Description references outer ize is that drilled below outer timated TOC for Hole Depth. Enter inner casing 00 at right in comments casing string. casing, Mud Weight: Inner casing 00: + = + 9.8 Shut-in Pressure, psi 358 0.052 x TVD EMW at 3085 Ft-MD , ---~-~._.-"---~ 500 w « :J (f) (f) w « n.. o o 5 10 15 Barrels 20 25 30 o 5 10 15 20 25 30 Shut-In time, Minutes o PIT Point .........CASING TEST .........LEAK-OFF TEST omments: e e Note to File CD2-404 Colville River Unit (Qannik) (206-054. . . 307-154 ) ConocoPhillips Alaska, Inc ConocoPhillips has made application for annular disposal for the subject well. This document examines the pertinent information for the well and recommends approval of ConocoPhillips' request. --Some severe lost circulation (80 bph) was experienced while drilling surface hole. This is unusual at Alpine. Losses were cured prior to running and cementing the casing with no problems experienced during the cementing operation. --Surface casing was cemented to surface. No problems were reported. Approximately 250 bbls of cement was circulated to surface. The net cement remaining in the surface hole was 48% XS of the calculated hole volume. -- On the initial leak off test, the pressure slope rises smoothly after filling the system to 18.1 EMW. Minimal fluid was pumped in. The pressure declined during the observation period to about 16.0 EMW. The initial leak off indicates that the surface casing shoe is well cemented. --No problems are reported drilling the intermediate hole. The 7-5/8" casing was run and successfully cemented. Full returns were noted and the casing was reciprocated. --An injectivity test down 10-3/4" x 7-5/8" annulus was conducted. Pressure steadily increases until the break at 15.6 EMW. The pressure declined with additional pumping to 13.6 -13.8 EMW. During the observation period, the pressure declined to 12.8 EMW. The lower EMW of the pump in test indicates that the planned disposal should be conducted at EMWs below that of the shoe integrity. --There are 17 wells within 1300' of CD2-404 with 6 wells within 525'. The surface shoe of CD2-15 is closest, about 250' distant. CD2-15 was recommended for annular disposal in 2001. CD2-21 is 280' distant. During pump in testing the final pressures were lower than seen on other wells. CPAI did not pursue AD on CD2-21. CD2-23 and CD2-11 lie closer to CD2-404 and do not exhibit similar fall-off pressures. All proximate wells have been examined and are in my database. There are no identified issues with any of the wells. Based on examination of the submitted information, I recommend approval of ConocoPhillips' request for the subject well. =:::~ Sr. Petroleum Engineer May 8, 2007 G:\common\tommaunder\ Well Information\By Subject\Annular Disposal\070508--CD2-404.doc ~ ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 April 11, 2007 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West ih Avenue, Suite 100 Anchorage, AK 99501 sCANNED APR 2 7 Z007 l~"" iJ-,~S- ..:l, D .., Dear Mr. Maunder: Sorry for the inconvenience, however it was observed that a spreadsheet sent to you and dated 3/31/07 was incomplete. Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). It was noticed that Alpine well CD2-404 was unintentionally left out of spreadsheet dated 3/31/07. Please find enclosed updated spreadsheet, and replace. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions. Sincerely, ~:-Z:7~/ ConocoPhillips Well Integrity Project Supervisor ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Alpine Field March 31,2007 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTO# cement pumped cement date inhibitor sealant date ft bbls ft Qal C02-1 205-118 4" na 4" na 2 2/18/2007 C02-2 205-109 6" na 6" na 2.5 2/18/2007 C02-404 206-054 6" na 6" na 1.8 3/22/2007 C02-7 203-187 16" na 16" na 7.5 2/17/2007 C02-9 202-129 22" na 22" na 10.5 2/17/2007 C02-12 203-073 16" na 16" na 7.5 2/17/2007 C02-14 201-177 4" na 4" na 2 2/17/2007 C02-15 201-159 12" na 12" na 5.7 2/17/2007 C02-16 202-144 11 '7" 1.6 4" 4/16/2003 1 3/8/2007 C02-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007 C02-18 203-151 36" na 36" na 17 2/17/2007 C02-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007 C02-2~ 204-245 6" na 6" na 2.5 2/18/2007 C02-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007 C02-24 201-095 6" na 6" na 1 3/8/2007 C02-26 201-232 1Q'5" na 4" 4/16/2003 1 318/2007 C02-28 202-217 29" na 29" na 11 3/8/2007 C02-30 203-135 8" na 8" na 3 3/8/2007 C02-31 204-082 15" na 15" na 6 318/2007 C02-32 202-029 8'6" 1.2 4" 4/16/2003 1 318/2007 C02-33 201-125 7' 1.0 4" 4/16/2003 1 318/2007 C02-34 202-126 4' 0.6 4" 4/16/2003 1 318/2007 C02-37 202-211 29" na 29" na 13.8 2/18/2007 C02-38 202-171 18" na 18" na 8.5 2/18/2007 C02-39 201-160 34" na 34" na 16.2 2/18/2007 C02-44 202-165 13" na 13" na 6.2 2/18/2007 C02-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007 C02-47 201-205 25" na 25" na 11.9 2/18/2007 C02-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007 C02-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007 CO2-53 204-089 4" na 4" na 2 2/18/2007 CO2-54 204-178 8" na 8" na 3.7 2/18/2007 CO2-55 203-118 13" na 13" na 6 2/18/2007 CO2-57 204-072 8" na 8" na 1 3/8/2007 CO2-58 203-085 6" na 6" na 1 3/8/2007 CO2-59 204-248 6" na 6" na 1.5 3/8/2007 C02-60 205-068 6" na 6" na 1 3/8/2007 , . . ~ ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 March 31, 2007 s!~ANNED OCT 312007 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West ih Avenue, Suite 100 Anchorage, AK. 99501 1 l"' ~l.f5 9vÐ '-1 Dear Mr. Maunder: }:'I Enclosed please find a spreadsheet with a list of wells fÌom the Alpine field (ALP). Some of these wells were found to have a void in the conductor by surface casing annulus. The voids that were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The remaining volume of annular void subsequently was filled with a corrosion inhibiter engineered to prevent water fÌom entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions. Sincerely, ~~C Jerry Dethlefs ConocoPhillips Well Integrity Proj Supervisor Attachment . . ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTO# cement pumped cement date inhibitor sealant date ft bbls ft gal C02-1 205-118 4" na 4" na 2 2/18/2007 C02-2 205-109 6" na 6" na 2.5 2/18/2007 C02-7 203-187 16" na 16" na 7.5 2/17/2007 C02-9 202-129 22" na 22" na 10.5 2/17/2007 C02-12 203-073 16" na 16" na 7.5 2/17/2007 C02-14 201-177 4" na 4" na 2 2/17/2007 C02-15 201-159 12" na 12" na 5.7 2/17/2007 C02-16 202-144 11'7" 1.6 4" 4/16/2003 1 3/8/2007 C02-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007 C02-18 203-151 36" na 36" na 17 2/17/2007 C02-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007 C02-21 204-245 6" na 6" na 2.5 2/18/2007 C02-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007 C02-24 201-095 6" na 6" na 1 3/8/2007 C02-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007 C02-28 202-217 29" na 29" na 11 3/8/2007 C02-30 203-135 8" na 8" na 3 3/8/2007 C02-31 204-082 15" na 15" na 6 3/8/2007 C02-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007 C02-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007 C02-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007 C02-37 202-211 29" na 29" na 13.8 2/18/2007 C02-38 202-171 18" na 18" na 8.5 2/18/2007 C02-39 201-160 34" na 34" na 16.2 2/18/2007 C02-44 202-165 13" na 13" na 6.2 2/18/2007 C02-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007 C02-47 201-205 25" na 25" na 11.9 2/18/2007 C02-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007 C02-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007 CO2-53 204-089 4" na 4" na 2 2/18/2007 CO2-54 204-178 8" na 8" na 3.7 2/18/2007 CO2-55 203-118 13" na 13" na 6 2/18/2007 CO2-57 204-072 8" na 8" na 1 3/8/2007 CO2-58 203-085 6" na 6" na 1 3/8/2007 CO2-59 204-248 6" na 6" na 1.5 3/8/2007 C02-60 205-068 6" na 6" na 1 3/8/2007 Alpine Field March 31,2007 ìM~ DATA SUBMITTAL COMPLIANCE REPORT 3/12/2007 Permit to Drill 2042450 Well Name/No. COLVILLE RIV UNIT CD2-21 Operator CONOCOPHILLlPS ALASKA INC ~ ~f k^-ó~;}- API No. 50-103-20504-00-00 MD 19359r TVD 7175 r/ Completion Date 2/7/2005 Completion Status i-OIL Current Status i-OIL UIC N ~~..~._._..--- U'__ "____________ ----- --.----- -----_._----~ -----~- REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes -.--------.--- "- -----~--_.- --------~--~_...- .- ----_._-~~-~. DATA INFORMATION Types Electric or Other Logs Run: GR/Res, Dens/Neutron Well Log Information: (data taken from Logs Portion of Master Well Data Maint Log/ Electr Data ... Digital Dataset ~ Med/Frmt Number Name ~~._...__._________..____n..,,_ " 'lt D Lis 13083 Induction/Resistivity 13083 LIS Verification ~/C Lis 13160 I nduction/Resistivity I~ Tf 13160 LIS Verification I C Pdf 13786 I nd u ction/Resistivity Log Log Run Interval OH/ Scale Media No Start Stop CH Received Comments ^'-_.._-------. -~----------- - 3061 19295 Open 3/16/2005 GR/EWR4/ABI/ROP/PWD/ MWD 3061 19295 Open 3/16/2005 GR/EWR4/ABI/ROP/PWD/ MWD 3095 7027 Open 6/10/2005 PB 1 3095 7027 Open 6/10/2005 PB 1 3095 19359 Open 3/9/2006 Graphics .pdf & .emf ROP DRG EWR plus PB 1 3095- 20171 ROP DGR EWR ALD CTN . _____n____________.._ -----------------..- . _~ _n_.___·_____·___.__ . - --------.---.-"...--------'''-. Well Cores/Samples Information: Name Interval Start Stop Sent Received Sample Set Number Comments e ADDITIONAL INFORMATION Well Cored? Y Zt;i) Chips Received? '?Tf\J Daily History Received? QN @/N Formation Tops Analysis Received? ~ --------.------- ... - ________n_________... -_.._---~._._.._-_. -----------, --" ~--------_.- -- ---.-.------ -- ~"-'- ----------. -~ ---.-------.- --- ----~.- -......------------ ------------- Comments: DATA SUBMITTAL COMPLIANCE REPORT 3/12/2007 Permit to Drill 2042450 Well Name/No. COLVILLE RIV UNIT CD2-21 Operator CONOCOPHILLlPS ALASKA INC API No. 50-103-20504-00-00 ~~mPI,::::9ReY;e~~ 7175 --¡t;;~'" D't~/2005 Completion Status i-OIL Current Status 1-011 6 !.J. A........ UIC N Date: t I /".. ~7 e e -e e WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Ceresa Tolley 333 West ih Avenue, Suite 100 Anchorage, Alaska 99501-3539 March 7, 2006 RE: MWD Fonnation Evaluation Logs: CD2-21 & CD2-21 PBl, AK-MW-3458623 CD2-21: Digital Log Images: 50-103-20504-00 -# n 71?~ 1 CD Rom CD2-21 PBl: Digital Log Images: 50-103-20504-70 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 Date: 9~~4 Signed: 1LJ ðfu Iv ÙJ¥ - Æ t{ J-- frl -L CD2-21 AD application, et al . . Tom, ~\{-·if-4 ~ We continued to have problems getting a temperature log on CD2-21. While changing out gas lift valves, we stuck the wireline tools and spent some time fishing. We were unable to retrieved the entire toolstring, and then we had a series of mechanical failures with the logging unit at Alpine. It was decided to put the ~ll ba~rior t~ble to get the temperature log. . ~ ~ Since we currently are not planning to drill at CD2 in the near future, please cancel the application for CD2-21. We may re-apply if drilling at CD2 is resumed. . used CD2 or annular lsposal. CD2-57 was used, and took 19181 bbls of fluid, but it started to require higher pressures to put fluid away, so we shut down and freeze protected the well earlier than planned. There should be a annular disposal permit for CD4-319 in your office now (or very soon), it was sent out yesterday. Let me know if you have any questions. Vern -----Original Message----- From: Thomas Maunder [mailto:tom maunder@admin.state.ak.us] Sent: Tuesday, December 06, 2005 8:56 AM To: Johnson, Vern Subject: Re: CD2-21 AD application, et al Vern, This is the message trail I can find on the AD application for CD2-21. Has anything changed on the status?? The sundry request has been over here for a while and I'd like to move it on. If it doesn't look like the temp survey will be available, it may be appropriate to "withdraw" or "cancel" the application. How are/did the disposal operations go with CD2-57 and 2-59?? Will you all be applying for AD at Nanuq?? Look forward to your reply. Tom Maunder, PE AOGCC Thomas Maunder wrote, On 9/8/2005 2:17 PM: Thanks Verno I will look forward to the information. Tom Johnson, Vern wrote, On 9/8/2005 2:15 PM: Tom, We have been delayed on our proposed testing (temp log). The well was put back on production earlier than we wanted it to be- and we could not do the logging while the well was flowing. I think we will be able to run the test this weekend. Vern -----Original Message----- 10f3 12/812005 9:47 AM CD2-2l AD application, et al . . From: Thomas Maunder [mailto:tom maunder@admin.state.ak.us] Sent: Wednesday, September 07, 2005 8:25 AM To: Johnson, Vern Subject: Re: CD2-21 AD application Vern, I am back and getting up to speed. Anything new on AD2-21?? Tom Maunder, PE AOGCC Thomas Maunder wrote, On 8/22/2005 12:12 PM: OK. On the basis of pumping - 400 bbl sea water plus freeze protection, I will not plan to finish up the sundry until you have the diagnostic information. Please keep me informed on this work. If it appears that more diagnostics may be needed then a sundry might be in order. It will be interesting to see the plots. I am curious how - 80 degrees was/is determined?? I don't have a handle on what the in situ temperature might be at the shoe depth, but for temperature "contrast" purposes I'd have guessed that you all would pump cold fluid. Tom Maunder, PE AOGCC Johnson, Vern wrote, On 8/22/2005 11:58 AM: The well is currently not producing. The plan is still being discussed, but we will likely run a baseline pass then pump warm (+/- 80°F) seawater (+/- 400 bbl) , then run a few more successive passes with the temperature logging tool. Vern -----Original Message----- From: Thomas Maunder [mai.l. to: tom maunder~~?:dm:í.n. state. ak. us] Sent: Monday, August 22, 2005 11:54 AM To: Johnson, Vern Subject: Re: CD2-21 AD application Thanks Verno Some questions... What type of fluid are you planning to pump?? Will there be a baseline pass?? Is the well already in production?? Tom Johnson, Vern wrote, On 8/22/2005 11:48 AM: Tom, Yes, this is the well that we plan to do some additional diagnostic work. In the next ± week we plan to run a temperature survey while pumping warm fluid to confirm that there are no casing integrity issues. When we have the results, I'll send an email to let you know how it went. 20f3 12/8/2005 9:47 AM CD2-21 AD application, et al 30f3 . . Vern -----Original Message----- From: Thomas Maunder [mailto:tom maunder@admin.state.ak.us] Sent: Monday, August 22, 2005 9:11 AM To: Johnson, Vern Cc: Alvord, Chip; Noel, Brian Subject: CD2-21 AD application Vern, I have been looking at the CD2-21 application. The pressure bleed off after the recent pump in tests goes lower than I remember having seen before. What is CPAI's interpretation of this behavior?? I seem to remember that you had mentioned of desiring to do some diagnostic logging on an AD well. Is this the one?? Look forward to your reply. Tom Maunder, PE AOGCC 12/8/2005 9:47 AM "-"' ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 Conoc~illips August 15, 2005 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 . . . AI~$~~ QiL& Ga~ Cn .r> ."- . Re: Application for Sundry Approval for Annular DIsposal of DnllIn2 W'. lS£e mti\Velt"~ÐJQtiï fU1fjn~rtig~ Dear Sir or Madam: I AUG 1 B 2005 ConocoPhillips Alaska, Inc. hereby requests that CD2-21 be permitted for annular pumping of fluids occurring as a result of drilling operations, per regulation 20 ACC 25.080. It is intended to begin annular disposal operations on CD2-21 approximately August 30, 2005 or as soon as a permit is available.. Please find attached form 10-403AD and other pertinent information as follows: 1. Annular Disposal Transmittal Form 2. Pressure Calculations for Annular Disposal 3. Surface Casing Description 4. Surface Casing Cementing Report & Daily Drilling Report during cement job 5. Casing and Formation Test Integrity Report (LOT at surface casing shoe). 6. Intermediate Casing Description 7. Intermediate Casing Cementing Report & Daily Drilling Report during cement job 8. Formation LOT on 9-5/8" x 7" casing annulus 9. Plan View of Adjacent Wells 10. List of wells on CD2 pad and the lateral distance from the surface casing shoe. 11. Additional information regarding wells within ~ mile radius, not already on file at AOGCC: CD2-31 & CD2-18 Further details regarding wells on CD2 pad within ~ mile radius should be on file at the AOGCC. The initial annular LOT (12.9 ppg) and subsequent annular LOT (13.7 & 14.3 ppg 8/5/05) occurred at a lower equivalent mud weight than the casing shoe test (17.5 ppg LOT). Therefore we conclude that waste will not migrate above the confining zone provided we do not inject with sustained surface pressures that win cause pressures at the surface shoe to be in excess of the shoe FIT /LOT. If you have any questions or require further information, please contact Vem Johnson at 265-6081; Chip Alvord can also be reached by calling 265-6120. s~~ / i.-- ¿ "- <ó IIC~5'---- Vem Johnson Drilling Engineer cc: CD2-21 Wen File Chip Alvord Anadarko Sharon Allsup-Drake ATO-1700 ATO-1530 r'"- U STATE OF ALASKA c~J~iASKA OIL AND GAS CONSERVATION COMMISSION ANNULAR DISPOSAL APPLICATION 20 AAC 25.080 ConocoPhillips Alaska 3. Permit to Drill Number: 204-245 4. API Number: 50-103-20504-00 2. Address: 5. Well P.O. Box 100360, Anchorage, Alaska CD2-21 6. Field: Colville River Field 7. Publicly recorded wells a) All wells within one-quarter mile: CD2-24, CD2-15, CD2-23, CD2-12, CD2-20, CD2-09 CD2-18, CD2-31 8. Stratigraphic description: a) Interval exposed to open annulus: Torok and Seabee formation, shale, siltstone and sandstone b) water wells within one mile: b) Waste receiving zone: Sand layers in the Colville group C-30 in the Seabee formation None c) Confinement: The Schrader Bluff formation provides an upper barrier and marine shales and claystones of the Lower Cretaceous Torok Formation provide a lower barrier 9. Depth to base of permafrost: approximately 1700' MO / 1600' TVO 10. Hydrocarbon zones above waste receiving zone: None 11. Previous volume disposed in annulus and date: None 12. Estimated slurry density: densities range from diesel to 12#/gal 15. Fluids to be disposed: 13. Maximum anticipated pressure at shoe: 2151 PSI 14. Estimated volume to be disposed with this request: 35,000 bbls. 16. Estimated start date: Types of waste may be drilling mud, drilling cuttings, reserve pit fluids, cement- contaminated drilling mud, completion fluids, diesel, formation fluids associated with the act of drilling a well, drill rig wash fluids, cement rinsate, domestic waste water, any added water needed to facilitate pumping of drilling mud or drilling cuttings, and any other fluids associated with drilling a well. W-Aug-05 17. Attachments: Well Schematic (Include MD and TVD) 0 Cement Bond Log (if required) D FIT Records wlLOT Graph [2] Surf. Casing Cementing Data [2] Other D 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: 77- ~ì:J '7/~ z.,s - G. q 77 Title: Printed Name: ~ Chip Alvord Phone Number: Commission Use Only 265-6120 Date: ð/I!/OS- Conditions of approval: LOT review and approval: ~~:,.'S-::·(glf./) Subsequent form required: Approval number: Approved by: Jl'v'J lidflQR BY ORDER OF THE COMMISSION Date: Form 10-403AD Rev. 9/2003 INSTRUCTIONS ON REVERSE Submit in Duplicate "-" '-' Annulus Disposal Transmittal Form - Well CD2-21 AOGCC Regulations, 20 AAC 25.080 (b) 1 Designation of the well or wells to receive drilling wastes: C02-21 2 The depth to the base of freshwater aquifers and pennafrost, if There are no USD\V aquifers in the Colville River Unit. present. Estimated base ofPermafTost = 1600' TVD (RKB) 3 A sttatigraphic description of the interval exposed to the open The Schrader Bluff formation provides an upper barrier and annulus and other information sufficient to support a marine shales and claystones of the Lower Cretaceous Torok commission fmding that the waste 'will be confmed and will Fonnation provide a lower banier. Calculated water salinities not come to the surface or contaminate freshwater. of the Cretaceous and older stratigraphic sections range from 15000 to 18000 mgiL (Ref. AOGCC Conservation Order No. 443, !vlarch 15, 1999) 4 A list of all publicly recorded wells within one-quarter mile and all publicly recorded water wells within one mile of the well to receive drilling waste. 5 Identify the types and maximum volume of waste to be disposed of and the estimated density of the waste slurry. See attached map indicating wells within lí4 mile. There are no water wells within 1 mile. Types of waste may be driUing mud, dri11ing cuttings, reserve pit fluids, cement-contaminated drilling mud, completion fluids, diesel, formation t1uids associated with the act of drilling a weB, drm rig wash fluids, domestic waste water, any added water needed to facilitate pumping of drilling mud or drilling cuttings, and any other fluids associated with drilling a \veJ1. Densities range trom diesel to 12#ígaL Maximum volume to be pumped is 35,000 bbls. 6 A description of any waste sought to be determined as drilling Cement rinsate waste under (h)(3) of this section. 7 An estimate of maximum anticipated pressure at the outer casing shoe during annular disposal operations and calculations showing how this value was determined. 8 Details that show the shoe of the outer casing is set below the base of any freshwater aquifer and permafrost, if present, and cemented with sufficient cement to provide zone isolation: Maximum anticipated pressure at the outer casing shoe during disposal operations is 2151 psi. See attached calculation page. See attached: cementing reports, LOT i FIT reports and casing reports. 9 Details that show the inner and outer casing strings have See attached casing summary sheet and calculation pages. sufficient strength in collapse and burst to withstand anticipated pressure of disposal operations: 10 The downhole pressure obtained during a formation integrity See attached LOT/FIT report. test conducted below the outer casing shoe. 11 Identification of the hydrocarbon zones, if any above the Ni A depth to which the inner casing is cemented. 12 The duration of the disposal operation, not to exceed 90 days. Ni A 13 Whether drilling waste has previously been disposed of in the NíA annular space of the well and, ifso,1 a summary of the dates of the disposal operations, the volumes of waste disposed of, and the wells where the drilling waste was generated. 14 The welles) where the drilling waste to be disposed of was or CD2-01, C02-II, C02-04, CD2-34a, C02-17a, CD2-43a will be generated. 15 If the operator proposes not to comply with a limitation Ní A established in (d) of this section, an explanation of why compliance would be imprudent. 16 Any additional data required by the commission to confirm N/ A containment of drilling waste. [, .";~ .: .~.:-:... . .. .;~.4::..~:" Well Date Pressure Calculations for Annular Disposal (for submital with Annular Disposal Application) Assumptions Maximum injection pressure of Maximum density of the injection fluid is Pore pressure at the 9 5/8" casing shoe is GasIFluid Gradient in tubing/casing annulus Header Pressure (for wells on gas lift) CD2-21 8/1512005 ~ 1:: '.~' . ~ U 1,500 12.0 0.434 0.1 2,000 Version 1.0 - Jan '05 psi ppg psi/ft psi/ft psi rMaximum Fluid Density to avoid Burst of Surface Casing Pburst85% = PHydrostatic + P Applied - PPonnation TVD 2,992 = ( 2,364 * 0.052 * MW max MW max ppg ) + 1500 - (0.4337 * 2,364) 20.5 Surface Casing String 9.625 36 Size Weight Grade YburstlOO% Pburst85% In or 2,151 psi 12,176' MD "- 6,840' TVD ("Maximum Fluid Density avoid Collapse of 2nd Casing String P collapse85% = PHydrostatic + P Applied - P GasGradient - PHeader 3.5 "Tubing ppf J 55 3,520 2,992 2,364 17.5 12.9 1,500 pSI pSI Depth of Shoe FIT/LOT @ Shoe FIT/LOT for Annulus Max Surf Pressure ft ppg ppg psi 16.3 ) + 1,500 - ( 0.1000 * 6,840) - 2,000 4,599 = ( 6,840 * 0.052 't< M W max MW max ppg 2nd Casing String Size 7 in Weight 26 ppf Grade L 80 Y collapse I 00% 5,410 psi P collapse85% 4,599 psi Top of Cement 6,840 ft Gas Gradient 0.1 psi/ft Max Surf Pressure 1,500 psi "- Header Press 2,000 pSI Maximum Anticipated Pressure at Surface Casing Shoe P max allowable = Shoe TVD Depth * .052 * Shoe FIT/LOT P max allowable = 2,364 * .052 * 17.5 ) P max allowable = 2,151 psi This is the value for the Injection Permit "Maximum Anticipated Pressure at Shoe". ............. ~. Conoc6Phillips Casing Detail 9 5/8" Surface Casino Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN Doyon 19 RKB to Landing Ring FMC Gen V Hanger Jts 3 to 75 73 Jts 9-5/8" 36# J-55 BTC Csg Weatherford Float Collar Jts 1 to 2 2 Jts 9-5/8" 36# J-55 BTC Csg Ray Oil Tools "Silver Bullet" Float Shoe TD 12 1/4" Surface Hole RUN TOTAL 42 BOWSPRING CENTRALlZERS- 1 per jt on Jt #1 - #12 (stop ring on Jt #1 & 2 ) and over collars on jts# 14, 16, 18,20,22,24,26,28,30, 32,34,36,38,40,42,44,46,48,50,52,54,56,58,60,62 64, 66, 68,70,72. 80 joints in the pipe shed. Run 75 joints - 5 joints stay out Use Best-o-Life 2000 pipe dope MU torgue - 8600 ftIlbs Remarks: Up Wt - 160 k Dn Wt - 132 k Block Wt - 75k Well: CD2-21 Date: 12/29/2004 LENGTH 36.64 2.23 2957.07 1.46 84.96 2.24 Supervisor: D. Lutrick / L. Hill DEPTH TOPS 36.64 38.87 2995.94 2997.40 3082.36 3084.60 3094.60 Legal Well Name: CD2-21 Common Well Name: CD2-21 Event Name: ROT - DRILLING String Type: Surface Casing Hole TVO: 2,368.0 (ft) Ground Level: 15.90 (ft) Circ Hours: 1.50 (hr) Manufacturer: FMC Hanger Model: Actual TMD Set: 3,084.60 (ft) Item Size Weight Grade (in.) (Ib/ft) Casing Hanger 9.625 36.00 J-55 Casing 9.625 36.00 J-55 Float Collar 9.625 36.00 J-55 Casing 9.625 36.00 J-55 Float Shoe 9.625 36.00 J-55 Page 1 of 1 ConocoPhillips Alaska Casing Report Report #: Start: Spud Date: 12/21/2004 Report Date: 12/30/2004 End: 2/8/2005 1 12/23/2004 General Information Hole Size: Water TMO: Liner Overlap: KB to Cutoff: 8.500 (in) (ft) (ft) 36.64 (ft) Hole TMD: Str Wt on Slips: Max Hole Angle: Days From Spud: 3,095.0 (ft) 160,000 (Ibs) 62.11 n 2.70 (days) Permanent Datum: KB-Oatum: CF Elevation: Mud Lost: Kelly Bushing 15.90 (ft) (ft) (bbl) Casing Flange / Wellhead Top Hub/Flange: (in) / 5,000 (psi) BTM Hub/Flange: (in) / 5,000 (psi) Threads JTS Integral Casing Detail Model Top (ft) MU Torq. THO Manufacturer (ft-Ibf) Condo Max 00 Min 10 Compo Name (in) (in) Model: Horizontal Packoff Model: Drift (in) 8.765 BTC 8.765 BTC 8.765 BTC 8.765 BTC 8.765 BTC Length (ft) 73 2.23 2.957.07 1.46 84.96 2.24 36.64 38.87 2,995.94 2,997.40 3.082.36 Casing Hanger 8.921 9 5/8" 36# J-55 Float Collar 8.921 9 5/8" 36# J-55 Float Shoe 2 Remarks Ran 95/8" 36# J-55 BTC csg. - (75 jts total) PU hanger & landing jt. -land casing on FMC fiuted hanger on landing ring w/ shoe @ 3085' & FC @ 2999'. CBU @ Jt #47 1950' MD. No problems good displacement. Printed: 8/12/2005 3:34:26 PM Legal Well Name: CD2-21 Common Well Name: CD2-21 Event Name: ROT - DRILLING Primary Hole Size: 12.250 (in) TMD Set: 3,085 (ft) Date Set: 12/30/2004 Csg Type: Surface Casing Csg Size: 9.625 (in.) Cmtd. Csg: OPEN HOLE Cement Co: Dowell Schlumberger Rot Time Start: : Rec Time Start: : Time End: Time End: Type: Cement Casing Volume Excess %: 160.00 Meas. From: 140 Time Circ Prior To Cementing: 2.25 Mud Circ Rate: 273 (gpm) Mud Circ Press: 290 (psi) ',-" OonocoPhiUipsA.laska Q'ementi'l"I.gAe;po'rt Page 1 of 3 Report #: Start: Spud Date: 12/21/2004 1 Report Date: 12/30/2004 12/23/2004 End: 2/8/2005 Cement Job Type: Primary Squeeze Open Hole Hole Size: sa TMD: (ft) sa Date: sa Type: Cmtd. Csg: RPM: SPM: Squeeze, Casing Hole Size: TMD Set: Date Set: Csg Type: SQ TMD: SQ Date: Cmtd. Csg: Cementer: Steve Doughten Plug Hole Size: Top Set: (ft) BTM set: (ft) Plug Date: Plug Type: Drilled Out: Cmtd. Csg: Pipe Movement Pipe Movement: Reciprocating Init Torque: (ft-Ibf) Stroke Length: (ft) Avg Torque: (ft-Ibf) Drag Up: (Ibs) Stage No: 10f 1 Start Mix Cmt: 07:15 Start Slurry Displ: 08:14 Start Displ: 07:16 End Pumping: 08:52 End Pump Date: 12/30/2004 Top Plug: Y Bottom Plug: Y Type: Spud Mud Density: 9.6 (ppg) Visc: 55 (s/qt) Bottom Hole Circulating Temperature: (OF) Displacement Fluid Type:Mud Slurry Data Fluid Type: FLUSH Slurry Interval: (ft) Water Source: Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Disp Avg Rate: Disp Max Rate: Bump Plug: Press Prior: Press Bumped: Press Held: Float Held: 7.00 (bbllmin) 7.00 (bbl/min) Y 540 (psi) 1,120 (psi) 2 (min) Y Mud Data Max Torque: (ft-Ibf) Drag Down: (Ibs) Returns: 100 Total Mud Lost: (bbl) Cmt Vol to Surf: 140.00 (bbl) Ann Flow After: N Mixing Method: tub Density Meas By: Densometer PV/yP: 18 (cp)/15 (lb/100ft2) Gels 10 sec: 7 (lb/100ft2) Gels 10 min: (lb/100ft2) Bottom Hole Static Temperature: CF) Density: 9.6 (ppg) Volume: 212.00 (bbl) Stage No: 1 Slurry No: 1 of:4 To: (ft) Description: Biozan water w/ nut plug Cmt Vol: 40.0 (bbl) Density: 8.30 (ppg) Slurry Vol: (sk) Water Vol: (bbl) Class: Yield: (ft3/sk) Other Vol: 0 Temperature: (OF) Temperature: (OF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Purpose: Wash & mark Mix Water: (gal) Foam Job: N Temp CF) CF) Pressure (psi) (psi) Printed: 8/12/2005 3:34:12 PM ConocoPhillips Alaska Cementing Report Legal Well Name: CD2-21 Common Well Name: CD2-21 Event Name: ROT - DRILLING Slurry Data Fluid Type: FLUSH Slurry Interval: (ft) Water Source: Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Slurry Data Fluid Type: LEAD Slurry Interval: 2,585.00 (ft)ro: (ft) Water Source: lake Test Data Thickening Time: Free Water: (%) Fluid Loss: (ec) Fluid Loss Pressure: CF) Trade Name 0-53 S1 D-65 0-124 0-46 0-79 0-44 Page 2 of 3 Report #: Start: Spud Date: 12/21/2004 1 Report Date: 12/30/2004 12/23/2004 End: 2/8/2005 Stage No: 1 Slurry No: 2 of 4 To: (ft) Description: MUDPUSH XL Class: Cmt Vol: 50.0 (bbl) Density: 10.50 (ppg) Yield: (ft3/sk) Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Temperature: (OF) Temperature: (OF) Temperature: CF) Time Compressive Strength 1: Compressive Strength 2: Temp CF) (OF) Stage No: 1 Slurry No: 3 of 4 Description: ASLite Cmt Vol: 343.0 (bbl) Slurry Vol:434 (sk) Temperature: (OF) Temperature: (OF) Temperature: (OF) Class: Density: 10.70 (ppg) Yield: 4.45 (ft3/sk) Water Vol: 214.0 (bbl) Other Vol: 0 Time Compressive Strength 1: Compressive Strength 2: Temp CF) (OF) Stage No: 1 Slurry No: 3 of 4 - Additives Type GYPSUM ACCELERATOR DISPERSANT FILLlTE DEFOAMER EXTENDER ACCELERATOR Concentration Units 30.00 % 1.50% 0.50% 50.00 % 0.60% 1.50 % 9.00 %BWOW Liquid Cone. Stage No: 1 Slurry No: 4 of 4 Slurry Data Fluid Type: TAIL Description: Slurry Interval: 3,085.00 (ft)ro: 2,585.00 (ft) Cmt Vol: 48.0 (bbl) Water Source: lake Slurry Vol:239 (sk) Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: CF) Temperature: (OF) Temperature: (OF) Temperature: (OF) Class: G Density: 15.80 (ppg) Yield: 1.17 (ft3/sk) Water Vol: 29.0 (bbl) Other Vol: 0 Time Compressive Strength 1: Compressive Strength 2: Temp (OF) CF) Purpose: SPACER Mix Water: (gal) Foam Job: N Pressure (psi) (psi) Purpose: FILLER CEM Mix Water: 20.70 (gal) Foam Job: N Pressure (psi) (psi) Units Purpose: SHOE INTEG Mix Water: 5.10 (gal) Foam Job: N Pressure (psi) (psi) Printed: 8/12/2005 3:34:12 PM ~ ""-'" ConocoPhilliips ,At,aska C:emen:ti'ng ,iReport Page 3 of 3 Legal Well Name: CD2-21 Common Well Name: CD2-21 Event Name: ROT - DRILLING Report #: Start: Spud Date: 12/21/2004 1 Report Date: 12/30/2004 12/23/2004 End: 2/8/2005 Stage No: 1 SlurryNo:4of 4- Additives Trade Name Type ACCELERATOR DEFOAMER DISPERSANT Concentration 1.00 % 0.20% 0.30% Units Liquid Cone. Units S1 D-46 D-65 Casing Test Shoe Test Liner Top Test Test Press: 2,500 (psi) For: 30 (min) Cement Found between Shoe and Collar: N Pressure: 17.50 (ppge) Tool: N Open Hole: 30 (ft) Hrs Before Test: Liner Lap: Pas Test: (ppge) Neg Test: (ppge) Hrs Before Test: Cement Found on Tool: N Tool: N Tool: N Log/Survey Evaluation Interpretation. Summary CBL Run: N Under Pressure: (psi) Bond Quality: Cet Run: N Bond Quality: Temp Survey: N Hrs Prior to Log: Cement Top: (ft) How Determined: TOC Sufficient: Y Job Rating: If Unsuccessful Detection Indicator: Remedial Cementing Required: N Number of Remedial Squeezes: Remarks Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water wi nut plug for marker wi rig pump - Switch over to Dowell - Pumped 5 bbls water - Tested lines to 2500 psi - Dropped bottom plug - Mixed & pumped 50 bbls Mud Push XL spacer @ 10.5 ppg @ 5.6 bpm @ 175 psi - Mix & pump Lead slurry(AS3Iite) @ 10.7 ppg @ 7.0 bpm @ 227 psi - Observed nut plug @ shakers wi 323 bbls lead slurry pumped - pumped down tub - total of 343 bbls lead (434 sks) - Mixed & pumped Tail slurry (Class G wi .20% D46, .30% D65, 2% S001) 50 bbls (239 sks) @ 15.8 ppg @ 5.5 bpm @ 300 psi - Dropped top plug wi 20 bbls water fl Dowell - Switched over to rig pumps & displaced cement wi 212 bbls 9.6 ppg mud @ 7 bpm @ 490 to 560 psi for first 204 bbls displacement - slowed pumps to 3.5 bpm for last 8 bbls @ 540 psi - Bumped plug wi 1120 psi - Floats held - CIP @ 0852 hrs. Full returns throughout job wi 140 bbls 10.7 ppg cement returns to surface. Printed: 8/12/2005 3:34:12 PM ConocoPhillips Alaska, Inc. Daily Drilling Report I JOB NUMBER I EVENT CODE 124 HRS PROG TMD I TVD I DFS CD2-21 ODR 3,095.0 2,368.0 2.70 SUPERVISOR I RIG NAME & NO. I FIELD NAME / OCS NO. AUTH MD I DAILY TANG D. LutricklL. Hill doyon1(Çì2ppco.com 19 Alpine 20,244.0 0 CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT W/O MUD Picking up 5" DP. Recovered pipe wrench first run. 0 24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL PU DP and BHA RIH & Drill shoe track. 12/27/2004 410,638 I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE CLAYSTONE 10045956 LAST SURVEY: DATE TMD INC AZIM I LAST CASING I NEXT CASING 12/29/2004 3,046.20 61.707 301.340 9.625 (in) (Çì2 3,085.0 (ft) 7.000 (in) @ 13,339.0 (ft) DENSITY(ppg) 9.65 I PP I I ECD I I MUD DATAl DAILY COST I 0 I CUM COST I FV PVIYP GELS WUHTHP FCrr.SOL OIUWAT %Sand/MBT Ph/pM Pf/Mf CI Ca 290 26/55 30/61 6.4/ 2/ 1.3/30.0 8.5/ 0.01/ WELL NAME LITHOLOGY Page 1 of 2 I REPT NO. DATE 5 ¡12/30/2004 I CUM. TANGO CUM INT ANG w/ MUD o CUM COST W/ MUD 867,611 AUTH. LAST BOP PRES TEST 12/30/2004 H2S o LIME ES OPERATIONS SUMMARY FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION 00:00 02:15 2.25 CASE P RUNC SURFAC RIH w/9 5/8" 36# J-55 BTC csg from 131' to 1977'. 02:15 02:45 0.50 CASE P CIRC SURFAC Circ 1 csg volume. Stage pumps up to 5 bpm at 320 psi. Up wt 130k. Dn wt 115k. 02:45 04:00 1.25 CASE P RUNC SURFAC RIH w/9 5/8" csg from 1977' to 3048'. MU hanger. Land csg at 3085'. Up wt 160k. Dn wt 120k. 04:00 04:30 0.50 CASE P RURD SURFAC RD Franks fill up tool. MU cement head. RU lines. 04:30 06:30 2.00 CEMENT P CIRC SURFAC Circ and condition mud. Stage pumps up to 6.5 bpm at 290 psi. 06:30 06:45 0.25 CEMENT P SFTY SURFAC PJSM on cementing csg with all personnel. 06:45 08:30 1.75 CEMENT P PUMP SURFAC Rig pumped 40 bbls biozzan/ nutplug spacer. Dowell tested lines to 2500 psi. Dropped bottom plug. Dowell pumped 50 bbls 10.5 ppg mud push, 343 bbls 10.7 ppg lead cement and 50 bbls 15.8 ppg tail cement. 08:30 09:00 0.50 CEMENT P DISP SURFAC Dropped top plug. Dowell pumped 20 bbls H20. Rig pumped 212 bbls mud. Bumped plug. Floats OK. 140 Bbls. cement to surface. CIP @ 0852 Hrs. 09:00 09:45 0.75 CASE P DEQT SURFAC Test csg to 2500 psi for 30 min. 09:45 10:45 1.00 CASE P RURD SURFAC RD csg equip, landing jt and long bails. 10:45 13:30 2.75 CASE P NUND SURFAC Nipple down riser. 13:30 16:00 2.50 CASE P NUND SURFAC Changed swivel packing and nippled up BOP. 16:00 20:30 4.50 WELCTL P BOPE SURFAC Test BOPE - Hydril to 250 & 3500 psi - Pipe rams, choke & kill line valves, choke manifold valves, I BOP and floor valves to 250 & 5000 psi - performed accumutator closure test. Witiness of test by AOGCC waived by John Crisp. Pulled test plug and set wear bushing. 20:30 22:00 1.50 FISHT PULD SURFAC Picked up and diagramed fishing basket. 22:00 23:00 1.00 DRILL P PULD SURFAC Picked up DP from pipe shed and RIH. 23:00 23:30 0.50 RIGMNT P RSRV SURFAC Serviced rig and top drive. 23:30 00:00 0.50 DRI LL P PULD SURFAC Continued picking up 5" DP. 24 HR SUMMARY: Ran casing and circulated. Cemented 9 5/8" casing. Tested casing. Nippled down riser. NU and Tested BOP. PU and RIH reversing basket. COMPANY ConocoPhillips Company Fairweather E&P Service Doyon Drilling Inc ACI - Arctic Catering Halliburton - Sperry-Sun PERSONNEL DATA NO. HOURS COMPANY 1 Halliburton - Sperry-Sun 1 M-I Drilling Fluids 25 Swaco 5 Dowell 2 FMC Corporation Wellhe SERVICE SERVICE NO. HOURS 3 3 4 2 Printed: 8/12/2005 3:33:33 PM WELL NAME COMPANY Baker Oil Tools ITEM Fuel Rig Water, Drilling RESERVOIR NAME CD1 - 19 f l \.~ CD2-21 ConocoPhillips Alaska, Inc. Daily Drilling Report JOB NUMBER I EVE~DC~DE 124 HRS PROG IT~~095.0 SERVICE PERSONNEL DATA NO. HOURS COMPANY 1 Halliburton - Sperry-Sun UNITS gals bbls MATERIALS I CONSUMPTION ON HAND ITEM 4,970 Water, Potable 995 Fuel Camp USAGE 2,428 820 RESERVOIR AND INTERVAL DATA ZONE TOP BASE CD2 - 21 2295 0 I ~ TVD I DFS 2,368.0 2.70 SERVICE UNITS bbls gals COMMENTS USAGE 120 I REPT ~O. Page 2 of 2 DATE 12/30/2004 NO. HOURS ON HAND 420 2,080 Printed: 8/12/2005 3:33:33 PM Well Name: CD2-21 I Rig: PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Doyon 19 I Date: I 1/1/2005 Pump used: I #2 Mud Pump I. Drilling Supervisor: Lutrick / Hill Type of Test: I Casing Shoe Test LOT/FIT . Hole Size: USE PICK UST [ ... Casing Shoe Depth I RKB-CHF: 36.11Ft 3,085 1Ft-MOl 2,3641 Ft-TVD Casina Size and Description: 19-5/8" 36#/Ft J-55 BTC Casina Test Mud Weight: Mud 10 min Gel: Test Pressure: Rotating Weight: BlockslTop Drive Weight: Estimates for Test: Pumping down annulus and DP. Hole Depth 3,115IFt-MD I 2,378IFt-TVD 1·1 9.6 ppg 18.0 Lb/100 Ft2 2,500 psi 74,000 Lbs 74,000 Lbs 2.3 bbls Pressure IntearitvTest Mud Weight: 9.4 ppg Mud 10 min Gel: 12.0 Lb/100 Ft2 Rotating Weight: 120,000 Lbs BlockslTop Drive Weight: 74,000 Lbs Desired PIT EMW: 18.0 ppg Estimates for Test: 1057 psi 0.9 bbls \...1 1...1 EMW = Leak-off Pressure + Mud Weight = 995 94 0.052 x TVD 0.052 x 2364 + . EMW at 3085 Ft-MD (2364 Ft-TVD) = 17.5 ppg PIT 15 Second Shut-in Pressure, psi 920 3000 - - Lost 25 psi during test, held 99% - _ of test pressure. I I I I .'1!II,'rH.-...~~ ... Ai. 2500 - ~ ..,,¡r 2000 - w 0::: :::» U) 1500- U) W 0::: a. ,- ~ J6 ..I.... - 2 3 0 5 10 15 20 25 30 Shut-In time, Minutes o PIT Point Barrels .....CASING TEST --- LEAK-OFF TEST Comments: 6" liners on casing trips 5-1/2" liners for LOT Volume Input Barrels ... 0.1000 Bbls/Strk ... . Casing Test Pumping Bbls psi o 0 0.202 150 0.404 390 0.606 590 0.808 800 1.01 990 1.212 1120 1.414 1325 1.616 1490 1.818 1625 2.02 1810 2.222 2020 2.424 2250 2.626 2400 2.828 2600 Volume Pumped 2.8 tsbls Shut-in Min psi o 2600 1 2600 2 2600 3 2600 4 2600 5 2600 6 2600 7 2600 8 2600 9 2595 10 2595 15 2590 20 2585 25 2580 30 2575 Volume Bled Back Il::Sbls Pump Rate: 8.0 Strkfmin T Pressure Integrity Test Pumping Bbls psi o 80 0.085 85 0.17 100 0.255 140 0.34 195 0.425 265 0.51 330 0.595 410 0.68 500 0.765 590 0.85 630 0.935 700 1.02 765 1.105 810 1.19 860 1.275 895 1.36 915 1.445 965 1.53 995 1.615 1000 1.7 Volume Pumped 1.1 i:Sbls Shut-in Min psi o 1000 0.25 920 0.5 800 1 790 1.5 7('\/:::" 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5 7 7.5 8 8.5 9 9.5 10 Volume Bled Back Il::Sbls 780- 780 780 I 775 775 775 775 775 770 770 765 760 755 750 750 7~-' ~ Conoc6Phillips Casing Detail Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN Jts 3 to 313 Doyon 19 RKB FMC Gen V Hanger 311 Jts 7" 26# L-BO STCM Csg Davis Lync~ Float Collar 2 Jts 7" 26# L-80'STCM Csg Ray Oil Tools "Silver Bullet" Float Shoe Jts 1 to 2 TO B 1/2" Hole Total Centralizers: 113 Stop Rings: 40 Straight blade centralizer one per jt on jts # 1-15 Straight blade centralizer one per jt on jts. # 239,2240,241 Straight blade cent. one every other joint #'s 243 - 269 Straight blade cent. 2 per jt wI stop ring in middle of jt #'s 271 - 31.1 320 joints in shed - 313 total jts. to run 7 jts. Out Use JET LUBE Run & Seal pipe dope MU torque - 7900 ft/lbs Remarks: Up Wt - k On Wt -155 k Block Wt .,. 75k Supervisor: D. Lutrick L. Hill Well: CD2-21 Date: 1/26/2005 LENGTH 34.64 1.68 13255.57 1.32 86.88 2.15 DEPTH TOPS 34.64 36.32 13291.89 13293.21 13380.09 13382.24 13395.00 ConocoPhillips Alaska Casing Report Page 1 of 2 Legal Well Name: CD2-21 Common Well Name: CD2-21 Event Name: ROT - DRILLING Report #: Start: 2 12/23/2004 Spud Date: 12/21/2004 Report Date: 1/26/2005 End: 2/8/2005 General Information String Type: Intermediate Casing/Liner Permanent Datum: Kelly Bushing Hole Size: 6.125 (in) Hole TMD: 13,395.0 (ft) Hole TVD: 7,217.0 (ft) KB-Datum: 15.90 (ft) Water TMD: (ft) Str Wt on Slips: 145,000 (Ibs) Ground Level: 15.90 (ft) CF Elevation: (ft) . Liner Overlap: (ft) Max Hole Angle: 87.06 n Circ Hours: 3.00 (hr) Mud Lost: (bbl) KB to Cutoff: 34.64 (ft) Days From Spud: 29.70 (days) Casing Flange I Wellhead Manufacturer: Hanger Model: FMC FMC Model: Packoff Model: Gen IV FMC Top Hub/Flange: (in) / (psi) BTM Hub/Flange: (in) / (psi) Actual TMD Set: 13,382.24 (ft) Integral Casing Detail Item Size Weight Grade Drift Threads JTS Length Top MU Torq. THD Manufacturer Model Condo Max OD Min ID Camp. Name (in.) (Ib/tt) (in) (ft) (tt) (tt-Ibf) (in) (in) Casing Hanger 1.68 34.64 Casing Hanger Casing 7.000 26.00 L-80 6.151 BTC 311 13,255.57 36.32 6.276 7" 26# L-80 Cas Float Collar 7.000 1.32 13,291.89 Float Collar Casing 7.000 26.00 L-80 6.151 BTC 2 86.88 13,293.21 6.276 7" 26# L-80 Cas Float Shoe 2.15 13,380.09 Float Shoe 13,382.24 Non-Integral Casing Accessories Accessory Manufacturer Number Spacing (tt) Interval Top (tt) Bottom (tt) How Fixed Centralizer Centralizer Stop Collars RAY OIL TOOLS RAY OIL TOOLS WEATHERFORD 14 99 40 Remarks Held Pre-Job safety and Opts meeting with crew. Printed: 8/12/2005 3:34:32 PM ConocoPhillips Alaska Casing Report Page 2 of 2 Legal Well Name: CD2-21 Common Well Name: CD2-21 Event Name: ROT - DRILLING Report #: Start: 2 12/23/2004 Spud Date: 12/21/2004 Report Date: 1/26/2005 End: 2/8/2005 Remarks Run 7" 26# L-80 MBTC casing as follows: FS (Ray Oil Tool Silver bullet) 2 jts. - FC (Weatherford) - 2 jts. (first 4 connectioins BakerLoc - fill pipe & check floats on jt # 4) 100 jts. to 4250' (100 jts. total) Established circ @ 3.5 bpm I 350 psi - staged pumps up to 5.0 bpm - FCP 460 psi - total mud pumped 225 bbls - full returns throughout. PUW 155 K SOW 128K ( Continue running 7", 26#, L-80 casing to 7972' (187 jts total) Est. circulation - @ 2bbls/min - Circulate btms up - stage pumps to 5 bbls/min FCP 540 psi Continue running 7" csg to 11,514' (270 jts. total) Est. circulation @ 2 bbls/min Circulate btms up - staging pumps up to 4 bbls/min FCP 570 psi. Continue running 7" csg to 13,348' (313 jts. total) MU FMC fluted hanger and LJ, land casing with FS @ 13,382' - FC @ 13,292'. ( Printed: 8/12/2005 3:34:32 PM ConocoPhillips Alaska Cementing Report Legal Well Name: CD2-21 Common Well Name: CD2-21 Event Name: ROT - DRILLING Page 1 of 3 Report #: Start: Spud Date: 12/21/2004 3 Report Date: 1/26/2005 12/23/2004 End: 2/8/2005 Cement Job Type: Primary Primary Squeeze Open Hole Hole Size: 8.500 (in) Hole Size: TMD Set: 13,382 (ft) sa TMD: (ft) Date Set: 1/26/2005 sa Date: Csg Type: Intermediate Casing/Li sa Type: Csg Size: 7.000 (in.) Cmtd. Csg: OPEN HOLE Cement Co: Dowell Schlumberger Rot Time Start: Rec Time Start: Time End: Time End: Type: Cement Casing Volume Excess %: 40.00 Meas. From: 0 Time Circ Prior To Cementing: 3.00 Mud Circ Rate: 210 (gpm) Mud Circ Press: 580 (psi) Cmtd. Csg: Cementer: Steve RPM: SPM: Init Torque: Stroke Length: Squeeze Casing Hole Size: TMD Set: Date Set: Csg Type: sa TMD: sa Date: Cmtd. Csg: Plug Hole Size: Top Set: (ft) BTM set: (ft) Plug Date: Plug Type: Drilled Out: Cmtd. Csg: Pipe Movement Pipe Movement: Reciprocating (ft-Ibf) (ft) Avg Torque: (ft-Ibf) Drag Up: (Ibs) Stage No: 1 of 1 Start Mix Cmt: 16: 10 Start Slurry Displ: 16:14 Start Displ: 16:24 End Pumping: 18:00 EndPump Date: 1/26/2005 Top Plug: Y Bottom Plug: Y Disp Avg Rate: Disp Max Rate: Bump Plug: Press Prior: Press Bumped: Press Held: Float Held: 5.00 (bbl/min) 4.80 (bbl/min) N 500 (psi) (psi) 240 (min) N Max Torque: (ft-Ibf) Drag Down: (Ibs) Returns: 100 Total Mud Lost: (bbl) Cmt Vol to Surf: (bbl) Ann Flow After: Y Mixing Method: RCM Density Meas By: Densometer Type: LSND 1 Glydril Density: 9.8 (ppg) Visc: 39 (s/qt) Bottom Hole Circulating Temperature: (OF) Displacement Fluid Type:Mud PVNP: 8 (cp)/19 (lb/100ft2) Gels 10 see: 7 (lb/100ft2) Gels 10 min: 9 (lb/100ft2) Bottom Hole Static Temperature: (OF) Density: 9.8 (ppg) Volume: 494.00 (bbl) Slurry Data Fluid Type: FLUSH Slurry Interval: (ft) Water Source: lake Test Data Thickening Time: Free Water: (%) Fluid Loss: (ce) Fluid Loss Pressure: CF) Mud Data Stage No: 1 Slurry No: 1 of 3 To: (ft) Description: CW100 Cmt Vol: 50.0 (bbl) Slurry Vol: (sk) Temperature: (OF) Temperature: CF) Temperature: (OF) Density: 8.30 (ppg) Water Vol: (bbl) Class: Yield: (ft3/sk) Other Vol: 0 Time Compressive Strength 1: Compressive Strength 2: Purpose: PRIMARY Mix Water: (gal) Foam Job: N Temp (OF) (OF) Pressure (psi) (psi) Printed: 8/12/2005 3:34:19 PM , "-' "-" ConocoPhilHpsÄ1aska Cementing RèpØrt Page 2 of 3 Legal Well Name: CD2-21 Common Well Name: CD2-21 Event Name: ROT - DRILLING Report #: Start: Spud Date: 12/21/2004 3 Report Date: 1/26/2005 12/23/2004 End: 2/8/2005 Stage No: 1 Slurry No: 2 of. 3 Slurry Data Fluid Type: Spacer Slurry Interval: (ft) To: (ft) Water Source: lake Description: MUDPUSH XL Class: Cmt Vol: 40.0 (bbl) Density: 10.50 (ppg) Yield: (ft3/sk) Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Purpose: SPACER Mix Water: (gal) Foam Job: N Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Temperature: (OF) Temperature: (OF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Temp (OF) (OF) Pressure (psi) (psi) Stage No:1SlurryNo:30f 3 Slurry Data Fluid Type: TAIL Description: Slurry Interval: 12,176.00 (tIP: 13,382.00 (ft~mt Vol: 44.6 (bbl) Water Source: lake Slurry Vol:215 (sk) Class: G Density: 15.80 (ppg) Yield: 1.16 (ft3/sk) Water Vol: 26.0 (bbl) Other Vol: 0 Purpose: SHOE INTEG Mix Water: 5.09 (gal) Foam Job: N Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: rF) Temperature: (OF) Temperature: rF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Temp (OF) (OF) Pressure (psi) (psi) Stage No: 1 Slurry No:30f3- Additives Trade Name Type DEFOAMER DISPERSANT Concentration 0.20 % 0.30% 0.07% 0.40 % Units Liquid Conc. Units D-46 D-65 8155 D167 Printed: 8/12/2005 3:34:19 PM ConocoPhillips Alaska Cementing Report Page 3 of 3 Legal Well Name: CD2-21 Common Well Name: CD2-21 Event Name: ROT - DRILLING Report #: Start: Spud Date: 12/21/2004 3 Report Date: 1/26/2005 12/23/2004 End: 2/8/2005 Casing Test Shoe Test Liner Top Test Test Press: 3,500 (psi) For: 30 (min) Cement Found between Shoe and Collar: N Pressure: 12.47 (ppge) Tool: N Open Hole: 30 (ft) Hrs Before Test: Liner Lap: Pos Test: (ppge) Neg Test: (ppge) Hrs Before Test: Cement Found on Tool: N Tool: N Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Under Pressure: (psi) Bond Quality: Cet Run: N Bond Quality: Temp Survey: N Hrs Prior to Log: Cement Top: (ft) How Determined: TOC Sufficient: Y Job Rating: If Unsuccessful Detection Indicator: Remedial Cementing Required: N Number of Remedial Squeezes: Remarks Cemented 7" casing as follows: Pumped 5 bbls CW100 - Test lines to 3700 psi - Pumped 45 bbls Cw100 @ 8.3 ppg 5.5 bpm @ 500 psi. Pumped 40 bbls Mud Push XL 10.5 ppg @ 5.5 bpm I 550 psi - Dropped bottom plug - Mix & pumped 44.6 bbls of Class G wi 0.2% 046, 0.3% 065, 0.40% 0167, .1 % B 155 @ 15.8 ppg 5.2 bpm I 560 psi Dropped top plug wi 20 bbls water fl Dowell Switched to rig pumps & displaced wi 494 bbls of 9.8 ppg LSND mud - @ 6 - 3.5 bbls/min - 440 to 500 psi - plug not bumped CIP @ 1800 hrs. Floats did not hold. Good returns while cementing. Printed: 8/12/2005 3:34:19 PM "-' '~ Page 1 of 2 ConocoPhilUps Alaska:, Inc. Dally DriUing Report I JOB NUMBER I EVENT CODE /24 HRS PROG TMD ¡ TVD I DFS CD2-21 ODR 13,395.0 7,217.0 29.70 SUPERVISOR RIG NAME & NO. ¡FIELD NAME lacs NO. AUTH MD I DAILY TANG D. Lutrick I L. Hill doyon1(éi2PPco.com 19 Alpine 20,244.0 0 CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT W/O MUD Laying down 5" drill pipe. 0 24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL LD & PU DP & BHA. RIH & drill shoe track. FIT. Chanre Mud. 1/24/2005 325,493 LITHOLOGY I JAR HRS OF SERVICE BHA HRS SINCE INSP I LEAKOFF AFE FINE SAND 17.54 10045956 LAST SURVEY: DATE TMD INC AZIM I LAST CASING I NEXT CASING 1/24/2005 13,358.54 87.055 327.620 7.000 (in) @ 13,382.0 (ft) 3.500 (in) (éi2 12,562.0 (ft) DENSITY(ppg) 9.80 I PP I I ECD I I MUD DATAl DAILY COST 1 0 I CUM COST I FV PVIYP GELS WUHTHP FCIT.SOL OIUWAT %Sand/MBT Ph/pM Pf/Mf CI Ca 39 8/18 7/8· 3.8/9.0 11 I 0.5/20.0 9.41 0.05/ WELL NAME I REPT NO. DATE 32 1/26/2005 CUM. TANGo CUM INT ANG W/ MUD o CUM COST WI MUD 5,162,665 AUTH. LAST BOP PRES TEST 1/23/2005 H2S o LIME ES OPERATIONS SUMMARY FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION 00:00 03:45 3.75 CASE P RUNC INTRM2 Ran 87 Jts. 7" 26# L 80 BTCM casing to 7,972'. 03:45 04:45 1.00 CASE P CIRC INTRM2 CBU. 5 BPM 540 PSI. 04:45 08:45 4.00 CASE P RUNC INTRM2 Ran 83 Jts. 7" 26# L 80 BTCM casing to 11,514'. 08:45 10:00 1.25 CASE P CIRC INTRM2 CBU 4 BPM 570 PSI. 10:00 12:30 2.50 CASE P RUNC INTRM2 Ran 43 Jts. 7" 26# L 80 BTCM casing to 13,348'. Picked up landing Jt. and landed casing @ 13,382'. 12:30 13:00 0.50 CASE P RURD INTRM2 Laid down circulating tool and rigged up cement head. 13:00 15:45 2.75 CEMENT P CIRC INTRM2 Circulated and worked pipe. 2-5 BPM 580 PSI. PJSM for cement job. 15:45 18:00 2.25 CEMENT P PUMP INTRM2 Cemented 7" casing as follows: Pumped 5 bbls CW100 - Test lines to 3700 psi - Pumped 45 bbls Cw100 @ 8.3 ppg 5.5 bpm @ 500 psi. Pumped 40 bbls Mud Push XL 10.5 ppg @ 5.5 bpm 1550 psi - Dropped bottom plug - Mix & pumped 44.6 bbls of Class G w/ 0.2% D46, 0.3% D65, 0.40% D167, .1% B155 @ 15.8 ppg 5.2 bpm I 560 psi Dropped top plug w/ 20 bbls water fl Dowell Switched to rig pumps & displaced wI 494 bbls of 9.8 ppg LSND mud - @ 6 - 3.5 bbls/min - 440 to 500 psi - plug not bumped CIP @ 1800 hrs. Floats did not hold. Good returns while cementing. 18:00 22:00 4.00 CEMENT T EQIP OTHR INTRM2 wac. Well shut in and casing shut in. 22:00 23:00 1.00 CEMENT P RURD INTRM2 Opened casing and well No Flow. Rigged down cement tools. 23:00 00:00 1.00 CASE P DEQT INTRM2 Installed and tested FMC packoff. 24 HR SUMMARY: Ran casing to 7,972'. Circulated. Ran casing to 11,514'. Circulated. Ran and landed casing at 13,382'. Circulated and cemented casing. wac 4 hours. Rigged down tools. Set and tested packoff. COMPANY ConocoPhillips Company Fairweather E&P Service Doyon Drilling I nc ACI - Arctic Catering Halliburton - Sperry-Sun Halliburton - Sperry-Sun SERVICE PERSONNEL DATA NO. HOURS COMPANY 1 M-I Drilling Fluids 1 Swaco 27 Dowell 5 FMC Corporation Wellhe 1 Baker Oil Tools 2 Epoch Well Services Inc SERVICE NO. HOURS 4 4 2 1 ITEM Fuel Rig Water, Drilling UNITS gals bbls USAGE 2,233 300 MATERIALS J CONSUMPTION ON HAND ITEM 10,236 Water, Potable 1.255 Fuel Camp UNITS bbls gals USAGE 120 40 ON HAND 340 2,040 Printed: 8/12/2005 3:33:51 PM WELL NAME C02-21 RESERVOIR NAME C01 - 19 ConocoPhilUps Alaska, Inc. Daily Drilling Report I JOB NUMBER I EVENOTOCRODE 124 HRS PROG I TMD I TVD 13,395.0 7,217.0 RESERVOIR AND INTERVAL DATA ZONE TOP BASE C02 - 21 840 0 IDFS 29.70 COMMENTS Page 2 of 2 1 REPT NO. I DATE 32 1/26/2005 Printed: 8/12/2005 3:33:51 PM Well Name: CD2-21 Ri9: PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Doyon 19 Date: I 1/27/2005 Pump used: I Cement Unit \... Drilling Supervisor: Lutrick I Hill Type of Test: I Annulus Leak Off Test for Disposal Adequacy .. Hole Size: 8-1/2" \.. Casing Shoe Depth I RKB-CHF: 33.91Ft 3,085 1Ft-MOl 2,3641 Ft-TVD Casing Size and Description: 19-5/8" 36#/Ft )-55 BTC Changes for Annular AdeQuacv Test outer casing shoe test results in comments Description references outer casing string. 3!ze is that drilled below outer casing. ;timated TOC for Hole Depth. Enter inner casing 00 at right Pumping down annulus. Hole Depth 12,176IFt-MD I 6,840IFt-TVD \..1 Pressure Intef1ritYI~st Mud Weight: 9.8 ppg Inner casing 00: 7.0 In. Desired PIT EMW: Estimates for Test: 15.2 ppg 664 ps i 0.7 bbls 1..\ \..1 EMW = Leak-off Pressure + Mud Weight = 380 9 8 0.052 x TVD 0.052 x 2364 + . EMW at 3085 Ft-MD (2364 Ft-TVD) = 12.9 PIT 15 Second Shut-in Pressure, psi 358 500· w ~ :) CJ) CJ) w ~ a. " o o 10 15 Barrels 20 25 30 0 5 10 15 20 25 30 Shut-In time, Minutes o PIT Point .....CASING TEST ___ LEAK-OFF TEST Comments: Performed 9 5/8" casing shoe LOT = 17.5 EMW .. Volume Input Barrels ... Bbls/Strk ... Casing Test Pumping Shut-in Bbls psi Min psi o 1 2 3 4 5 6 7 8 9 10 15 20 25 30 Volume Pumped 0.0 Bbls Volume Bled Back IBbls Pump Rate: 0.8 Bbl/min . Pressure Integrity Test Pumping Bbls o 1 2 3 4· 5 6 7 8 9 10 11 12 13 14 15. 16 17 18 19 20 21 22 23 24 25 Volume Pumped 25.0 Bbls psi 35 100 121 147 172 192 212 249 270 259 303 306 294 :,32~ 345 311 369. 325 363 380 34.4 404 ~~(:). 396 492 404 Shut-in Min psi o 402 0.25 358 0.5 339 1 329 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5 7 7.5 8 8.5 9 9.5 10 Volume B led Back IBbls r 324' 320 315 309 308 308 3Qf3 308 308 30ß 307 ,3.Q9 ~Q9 305 306 r " PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Doyon 19 1 Date: 8/5/2005 Pump used: I Cement Unit I. Pumping down annulus. ~ Well Name: CD2-21 Rig: Drilling Supervisor: D. Burley Type of Test: I Annulus Leak Off Test for Disposal Adequacy ~ Hole Size: 8-1/2" I... Casing Shoe Depth I RKB-CHF: 33.91Ft 3,085 1Ft-MOl 2,3641 Ft-TVD Casina Size and Description: 19-5/8" 36#/Ft ]-55 BTC Chanaes for Annular Adeauacv Test outer casing shoe test results in comments Description references outer casing string. >ize is that drilled below outer casing. )timated TOC for Hole Depth. Enter inner casing 00 at right Hole Depth 12,176IFt-MD I 6,840IFt-TVD 1...1 Pressure IntearitvTest Mud Weight: 6.8 ppg Inner casing 00: 7.0 In. Desired PIT EMW: Estimates for Test: 15.0 ppg 1008 psi 1.2 bbls 1"'1 1...1 EMW = Leak-off Pressure + Mud Weight = 920 0.052 x TVD 0.052 x 2364 + 6.8 EMW at 3085 Ft-MD (2364 Ft- TVD) = 14.3 1000 - w §~O~ 0:: Q. o o 8 Barrels 10 12 14 2 4 6 ~CASING TEST ___LEAK-OFF TEST PIT 15 Second Shut-in Pressure, psi 741 16 16 o 5 10 15 20 25 Shut-In time, Minutes o PIT Point Volume Input Barrels ... Bbls/Strk ... Pressure Integrity Test CasinQ Test Pumping Shut-in Bbls psi Min psi o 1 2 3 4 5 6 7 8 9 10 15 20 25 30 30 Volume Pumped 0.0 ~bls Volume Bled Back li:sbls Comments: Used Ball Mill Injection pump for test Initial wellhead pressure 301 psi - pumped 25 bbls of diesel pressure increased to 431 psi just prior to charting test. Bbls o 2 3 4 6 7 8 9 10 11 12 13 14 15 16 Pumping psi 431 491 531 581 671 730 771 810 851 901 920 861 879 881 901 Volume Pumped 16.0 i:sbls Pump Rate: 1.0 USE UST .... Shut-in Min psi o 865 0.25 741 0.5 671 1 611 1.5 h"'.4 2 2.5 521 3 500 3.5 481 4 460 4.5 445 5 431 5.5 421 6 401 6.5 391 7 381 7.5 371 8 361 8.5 350 9 351 9.5 341 10 . 15 L 20 250 25 232 30 222 35 212 40 202 45 191 75 181 Volume Bled Back li:sbls Well Name: CD2-21 PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Doyon 19 I Date: I 8/5/2005 I Pump used: I Cement Unit I ~ Pumping down USE UST ... I Rig: I Drilling Supervisor: I D. Burley Type of Test: I Annulus Leak Off Test for Disposal Adequacy ... Hole Size: 8-1/2" I. Casing Shoe Depth I RKB-CHF: 33.91Ft 3,085 IFt-MDI 2,3641 Ft-TVD Casina Size and Description: 19-5/8" 36#/Ft J-55 BTC Chanaes for Annular Adeauacy Test Juter casing shoe test results in comments Description references outer casing string. :;ize is that drilled below outer casing. )timated TOe for Hole Depth. Enter inner casing 00 at right Hole Depth 12,176IFt-MD I 6,840IFt-TVD 1·1 Pressure IntearityTest Mud Weight: 6.8 ppg Inner casing OD: 7.0 In. Desired PIT EMW: Estimates for Test: 14.5 ppg 947 psi 1.1 bbls \·1 1·\ EMW = Leak-off Pressure + Mud Weight = 851 0.052 x TVD 0.052 x 2364 + 6.8 EMW at 3085 Ft-MD (2364 Ft-TVD) = 13.7 PIT 15 Second Shut-in Pressure, psi 741 w 0:: ::» en en w 0:: Q. r 'I~~ ¡ ~- [ ~\ \., ~ ---:\ o o 2 4 6 Barrels 8 10 12 0 5 10 15 20 25 30 Shut-In time, Minutes o PIT Point ---CASING TEST ___LEAK-OFF TEST Comments: Used Ball Mill Injection pump for job Started test 75 minutes after initial test was shut in. I Volume Input Pump Rate: 1.0 USEUST ~ Barrels ... Bbls/Strk ... CasinA Test Pressure Integrity Test Pumping Shut-in Pumping Shut-in Bbls psi Min psi Bbls psi Min psi 0 0 181 0 911 1 0.5 202 0.25 741 2 1 217 0.5 620 3 1.5 251 1 501 4 2 291 1.5 4~~ 5 2.5 345 2 3 " 6 3 461 2.5 361 7 3.5 641 3 351 8 4 771 3.5 341 9 4.5 851 4 321 10 5 869 4.5 311 15 5.5 890 5 301 20 6 901 5.5 290 25 6.5 901 6 281 30 7 891 6.5 272 7.5 880 7 262 8 889 7.5 251 8.5 901 8 241 9 901 8.5 241 9.5 911 9 241 10 911 9.5 232 10 ~{ '-" Volume Pumped 0.0 tsbls Volume Bled Back Itsbls Volume Pumped 10.0 tsbls Volume Bled Back Itsbls .."'IfIIIIII''''"IIIMmIIlI'''mlll'''.._"''..IIIItIl..llllllllnllnlllllllll.............III¡II¡IIIII"'"I"'"IIIIIIIIIIIII""IIII"IIIII"I'''"I'''''_IIIIIIII''"I''IIII_11I1...1I...11I1..""II...."...IIII'III...I"'..OIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII"11t1l1111111tlllllltllllnllllllltllllllllllllllnlllllllllllllllllllllllllllllllllllllllllt.lllllllllmtlllllllllllll111I1111111111111111111""IIIIIIIIII"lIIllIlIIlllIlIlIlllIIllIllIIlllIIllIltlllllllllll11'''11I11I1111I111I11I'"11111111I1111I111I111111I11I111111""1111I11111111111I1111111I11111I1"111I11111III"IIIIIIIIIIIIIIIII'lIlIIlIlIllIIlllIlIllIllIIlIlIlIIllIIlIIml"1II1111II111I1I11""11I111111111111111I11I11111111111111111111111111'_ ¡ CAStIG DETAIlS " conoCJ'"Pi,iIliPS '~ª,Ë ProJ~;e~:I:~rUnit ~ ~ ,..::;;;: I I Alaska -":.;;'..,"il::'~"'" Well:~~~~~PB1 I I HALLIBURTON CD2-21 I 2251---···· ê æ o an t:.. +' 751 :c 1:: o z ~ £' ::::J o en I o -751- -15XJ ~ö 't. i,,) I -3751 I o I -751 I -4500 11111111I111111111111111I11111111111111111111111111111111111I111I11111111111111111111111111111111111111111I11111111111111111111111111111111111111III'IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII"11111I11111111111111I1111111111111111111111111111111111111111111111111111I111111111I111111111111111I11111I111I111111111111111111I1111I.11I111I111I11111.11IIIIIIIIIIII'IIIllIltlllllllllll'IIIIIIfIIIIIIIIIIII IIIIIIIIIIII IIIII1111111111111111111111111111111111111111111111'11111111111111111111111I11111111111111111111111111111111I1111111I11111111I111111111111I11I1111111111111111111111111111111I111I111111111111111111111I111111111I11111111111111111111111111111I1111I111111111111111 1."./ CobJIoIIon~~CUMILn _ ; ConocoPhiUips ~~E Proj~~e~%~::: ~;r Unit ~ ~ ~ ~ = i==_¡======= :==_i Ataska GeodoIIc~~~CCH.I!» Well: CD2-21 Well bore: CD2-21PB1 ~ GrŒJ!"1d LnVBJ: lHH3D ~ ! HALLIBURTON Nor'f;jna!J\S~~ ~~~2~ 53XOO (CD2·2') CD2-21 I j Sperry Drilling Services E""!¡¡~AsP X: 37j7û2.5<Œ) I I !=_~ ! I 1==_ I 1~ I I i I I ! ¡ I ~ i I I i :::;.- i:C ~ i '$ ~ I~o~ ~ ~ I ~ po I I =----- ~ I I ª I \ .J" .Jx, .J" -= wes11-)lEasq+)(500 ftlin) ,J" RUIIUIl1I11I11I1I1IUUIIUIIIIUlIIUUlIIIIUUlIIIIII1I11I11I1I11U1IU1I11I1I1I11I1I1I1I11I11I11I11I1I1I11It1I11I1I11I1I11UIIUIIIIIIIIUlIII IUUIIUIIUIlIlIllIIllIllIIUItIlIIllIllIlIlIlIll IIIIIIIIIIIIIIIUllllllllllllltllUlIlIlIIlII111I11I111111I11I11111111111111I11111111I1111I111111111111111111111I111I1111I11I11I111111I1111I11I11I1111I11I111111111I11I111111I1111I11I111I11I111111I111111I11I11I11I1111I11111111I11I111111I11111111I1111I1111I11I1111I1111111111111111111I11111111I111111I111I1111111111111111111111111111I11I111I11I111111111111I11111I111111I111I11I111I1111I11I111I11I111I111111I111I1111I1111I11I1111I11I11111I1111I11I1111I11I1111111111I111I11111111I11I11I11I1111I11I1111I111111I.... 1(0) SURFACE CASING SHOE SEPARATION FROM CD2-21 CD2-21 x y Surface Casing Shoe ASP 4 Coordinates: 370286.77 5975261.48 ulstance Details from Surface csg. Surface csg. @ Ann. Object Shoe X Shoe Y Wells AOGCC Permit # Permit Date Source well Vol."'* Start Date End Date well* Coord. Coord. C02-35** ---- ---- ~ ~ --- 2377 372312.31 5974017.68 C02-24, C02-33, C02-33A. C02-42 y 301-140 6/1/2001 C02-15 33992 6/1/2001 10/10/2001 1506 371098.46 5973992.48 C02-33 (+A&B), C02-39, ~ C02-24 y 301-186 7/13/2001 C02-14, C02-15 33999 7/16/2001 10/9/2001 640 370630.11 5974721.81 C02-33 B*** --- ---- ------- --- --- 1381 370155.64 5973886.23 C02-39 y 301-281 10/9/2001 C02-15. C02-47. C02-44 29945 10/10/2001 9/16/2002 2629 372350.61 5973633.17 - C02-14 y 301-288 10/9/2001 C02-45, C02-47. C02-32 31073 11/13/2001 3/5/2002 1939 372202.47 5974960.87 C02-15 y 301-308 11/6/2001 C02-50, C02-25, C02-44 31652 3/6/2002 9/21/2002 612 370832.00 5974984.02 C02-47 y 301-322 12/3/2001 C02-34, C02-26 27349 12/17/2001 1/20/2002 2182 371231.72 5973294.19 C02-45 y 301-345 12/13/2001 C02-49, C02-17 22991 1/20/2002 2/19/2002 2850 372765.13 5973853.74 C02-34 y 302-069 3/4/2002 C02-13, C02-37 22842 10/17/2002 11/28/2002 1725 371803.06 5974439.79 C02-26 y 302-068 3/4/2002 C02-44, C02-29, C02-13 29626 9n /2002 10/17/2002 1669 371798.52 5974554.55 C02-49 y 302-070 3/4/2002 C02-50, C02-46, C02-22 27960 4/22/2002 5/28/2002 1537 371252.38 5974065.93 C02-17 y 302-122 4/10/2002 C0-48, C02-08 18181 5/29/2002 2n /2003 1610 371774.00 5974645.00 C02-32 y 302-119 4/30/2002 C02-19, C02-41. C02-23 31113 6/14/2002 7/23/2002 1392 371295.61 5974302.38 C02-41, C02-19. C02-16. CO2-50 y 302-121 4/30/2002 C02-38 32000 7/24/2002 9/7/2002 1723 371665.21 5974227.65 C02-25 y NA 1524 371594.00 5974479.00 C02-46 y 302-273 9/20/2002 C02-51, C02-12 31864 4/15/2003 5/19/2003 1699 371694.80 5974310.85 C02-22 y 302-274 9/20/2002 C02-08, C02-36, CO2-51 31253 2n /2003 3/16/2003 1558 371678.61 5974562.30 C02-28, C02-35a. C02-48 y 302-275 9/20/2002 C02-45, C02-08 32000 12/10/2002 2/4/2003 2034 371631.74 5973736.14 C02-19 y 303-083 4/28/2003 C02-58, CO2-52 31337 5/19/2003 6/27/2003 2081 372284.88 5974681.33 C02-41 y 303-081 4/28/2003 C02-20, C02-55.C02-43 32000 6/27/2003 7/28/2003 2243 371990.58 5973802.52 - C02-23 y 303-080 4/28/2003 C02-18, C02-55, C02-06 32000 9/4/2003 1/1/2004 751 371013.17 5975070.46 C02-16 y --- ---- ---- --- ---- 2224 372460.34 5974790.01 C02-38 y 303-082 4/28/2003 C02-40, C02-30 30011 7/28/2003 9/4/2003 2462 372033.86 5973527.13 C02-44 y --- --- ......-- --- --- 1981 372034.57 5974328.53 C02-29 y 303-249 8/25/2003 C02-06, C02-30, C02-27 29036 10/8/2003 11/19/2003 2394 372652.44 5974896.02 ~O2-13 Y --- ---- ----- --- --- 2429 372658.78 5975785.31 C02-37 y -- ---- ~ ---- --- 2710 371569.79 5972874.47 C02-28 y --- --- --- --- --- 1928 372139.80 5974728.95 C02-08 y --- ---- ---- --- --- 2394 372655.88 5975603.76 C02-36 y 303-365 12/12/2003 C02-43, C02-31, CO2-57 32000 12/31/2003 7/9/2004 2328 371848.22 5973535.38 CO2-51 y 303-312 10/28/2003 C02-07. C02-10 31769 11/19/2003 12/24/2003 3379 373114.02 5973411.81 - C02-12 y 303-365 12/12/2003 C02-57, C02-31 32000 5/15/2004 6/14/2004 806 371071.29 5975445.60 ·C02-58 y NA 3174 372102.03 5972657.80 CO2-52 y NA 2844 372637.61 5973661.63 C02-20 y 304-288 7/30/2004 452 1107 371366.14 5975507.11 CO2-55 y --- --- --- --- --- 2228 371118.23 5973194.84 C02-40 y NA 0 1515 370691.67 5973801.44 C02-30 NA 0 1661 370473.52 5973610.96 . C02-18 -- ---- --- ---- --- 714 369825.76 5974716.05 C02-D6 y NA 0 1525 371610.81 5976018.45 C02-27 y 304-226 6/23/2004 C02-53, C02-05, C02-09 32000 7/9/2004 8/27/2004 3523 373046.07 5973071.83 C02-10 y 304-289 7/30/2004 C02-D9. CO2-56 30703 8/27/2004 10/15/2004 1687 371800.58 5976006.36 C02-D7 y NA 0 2187 372218.06 5976287.95 C02-43 --- --- A rr:~io Pg....~~u --- ---- ---- 1742 370344.04 5973520.68 CO2-57 y NA 0 3700 372537.05 5972324.37 1C"" C02-31 NA 0 933 369824.37 5974451.30 CO2-53 y 304-361 9/30/2004 C02-56, CO2-54 20350 10/3/2005 1 0/22/2005 3793 372896.67 5972509.19 C02-D5 NA 0 1526 370258.60 5973735.40 - C02-09 y 304-362 9/30/2004 NA 382 978 370318.00 5976239.00 CO2-56 NA 0 2246 369875.93 5973053.08 CO2-54 NA 0 1921 369991.09 5973363.59 C02-21 0 370286.77 5975261.48 CO2-59 1368 369650.94 5974049.86 C02-60 3086 371269.33 5972336.05 C02-03 1446 371040.60 5976495.42 C02-D2 1190 369463.97 5976121.87 C02-01 C02-11 C02-04 * Lateral distance in feet. between surface casing shoes, in the X-V plane ** C02-35 was drilled from an ice pad in early 1998. The 9-5/8" x 7" annulus has not been permitted for annular disposal. ***C02-33 B was a delineation well with a window milled out of 9-5/8" casing at 3840' MO (3062' TVO), shoe depth shown indicates window depth. It has not been permitted for annular disposal. *-* As of 07-29-05 Note that this sheet is not the definitive record ~ ~ Casing Detail 95/8 (lPHILLlPS Alaska, Inc. .~ A Subsidiary of PHILLIPS PETROLEUM COMPANY Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN Jts 53 to 76 Doyon 19 RKB to LOS FMC Gen V Hanger 9-5/8" 36# J-55 BTC Csg 9-5/8" TAM port collar 9-5/8" 36# J-55 BTC Csg Davis Lynch Float Collar 9-518" 36# J-55 BTC Csg Davis Lynch Float Shoe 24 Jts Jts 3 to 52 50 Jts Jts 1 to 2 2 Jts TO 12 1/4" Sutiace Hole RUN TOTAL 43 BOWSPRING CENTRALIZERS - 1 per jt on Jt #1 - # 12 (On stop rings of Jt #1 & #2) 14,16,18,20,22,24,26,28,30,32,34,36,38, 40,42,44,46,48,50,52,54,56,5860,62,64,66,68,70,72,74 80 joints total in shed - 76 joints total to run Last 4 joints, stay out, # 77 thru # 80 Use API Mod Best 0 Life Artie Grade Csg Compound. Remarks: Up Wt - K Ibs Dn Wt - K Ibs Block Wt 75K Ibs Supervisor Guy Whitlock Well: CD~2w18 Date: 9/5/2003 DEPTH LENGTH TOPS 36.75 2.19 1008.12 2.99 2089.74 1.49 78.15 2.32 36.75 38.94 1047.06 1050.05 3139.79 3141.28 3219.43 3221.75 3233.00 ConocoPhillips Alaska Casing Report Page 1 of 1 Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Report #: Start: 1 9/8/2003 Spud Date: 9/8/2003 Report Date: 9/8/2003 End: 9/23/2003 General Information String Type: Surface Casing Hole TVD: 2,352.0 (ft) Ground Level: 15.90 (ft) Circ Hours: (hr) Permanent Datum: Kelly Bushing Hole Size: 12.250 (in) KB-Datum: 52.00 (ft) Water TMD: (ft) CF Flev3tion: (ft) Liner Overlap: (ft) Mud Lost: (bbl) KB to Cutoff: 36.75 (ft) Hole TMD: Str Wt on Slips: Max Hole Angle: Days From Spud: 3,233.0 (ft) (Ibs) n 4.00 (days) Casing Flange / Wellhead Manufacturer: FMC Hanger Model: Model: Injector Packoff Model: Top Hub/Flange: (in) / (psi) BTM Hub/Flange: (in) / (psi) Actual TMD Set: 3,221.75 (ft) Integral Casing Detail Item Size Weight Grade Drift Threads JTS Length Top MU Torq. THO Manufacturer Model Condo Max 00 Min 10 Camp. Name (in.) (Ib/ft) (in) (ft) (ft) (ft-Ibf) (in) (in) Casing Hanger 9.625 2.19 36.75 NEW Casing Hanger Casing 9.625 36.00 J-55 8.765 BTC 24 1,008.12 38.94 NEW 8.921 95/8" 36# J-55 Cement Stage Tool 9.625 2.99 1,047.06 TAM Port collar NEW Cement Stage T c Casing 9.625 36.00 J-55 8.765 BTC 50 2,089.74 1,050.05 NEW 8.921 95/8" 36# J-55 Float Collar 1.49 3,139.79 y WEATHERFORD NEW Float Collar Casing 9.625 36.00 J-55 8.765 BTC 2 78.15 3,141.28 y NEW 8.921 95/8" 36# J-55 Float Shoe 2.32 3,219.43 Y RAY OIL TOOLS Silver Bullet NEW Float Shoe Non-Integral Casing Accessories Accessory Manufacturer Number Spacing (ft) Interval How Fixed Top (ft) Bottom (ft) Stop Collars Bowspring Centralizer Bowspring Centralizer WEATHERFORD WEATHERFORD WEATHERFORD 2 12 31 Clamped OverCollar OverCollar Remarks TAM port collar run due to lost circulation experienced when drilling at 2400' and tight hole when pulling out of hole to run casing. Printed: 8/16/2005 6:59:46 AM -- ~ ConocoPh iUipsAlaska Cementing...Repørf Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Primary Hole Size: 12.250 (in) TMD Set: 3,222 (ft) Date Set: 9/8/2003 Csg Type: Surface Casing Csg Size: 9.625 (in.) Cmtd. Csg: Surface Casing Cement Co: Dowell Schlumberger Rot Time Start: Rec Time Start: Time End: Time End: Type: Cement Casing Volume Excess %: 50.00 Meas. From: 225 Time Circ Prior To Cementing: 1.50 Mud Circ Rate: 42 (gpm) Mud Circ Press: 300 (psi) Report #: Start: 1 9/8/2003 Cement Job Type: Primary Squeeze Open Hole Hole Size: sa TMD: (ft) sa Date: sa Type: Cmtd. Csg: Squeeze Casing Hole Size: TMD Set: Date Set: Csg Type: sa TMD: sa Date: Cmtd. Csg: Cementer: Jim Thompson Pipe Movement Pipe Movement: Reciprocating RPM: SPM: Init Torque: (ft-Ibf) Stroke Length: (ft) Avg Torque: (ft-Ibf) Drag Up: (Ibs) Start Mix Cmt: 15: 13 Start Slurry Displ: 15: 13 Start Displ: 16:23 End Pumping: 17:08 End Pump Date: 9/8/2003 Top Plug: Y Bottom Plug: Y Stage No: 10'.1 Disp Avg Rate: Disp Max Rate: Bump Plug: Press Prior: Press Bumped: Press Held: Float Held: 6.00 (bbl/min) 6.00 (bbl/min) Y 510 (psi) 1,030 (psi) 2 (min) Y Page 1 of 3 Spud Date: 9/8/2003 Report Date: 9/8/2003 End: 9/23/2003 Plug Hole Size: Top Set: (ft) BTM set: (ft) Plug Date: Plug Type: Drilled Out: Cmtd. Csg: Max Torque: (ft-Ibf) Drag Down: (Ibs) Returns: 100 Total Mud Lost: (bbl) Cmt Vol to Surf: 250.00 (bbl) Ann Flow After: N Mixing Method: Density Meas By: DS Type: Spud Mud Density: (ppg) Visc: (s/qt) Bottom Hole Circulating Temperature: (OF) Displacement Fluid Type: Mud PVIYP: (cp)/ (lb/100ft2) Gels 10 see: (lb/100ft2) Gels 10 min: (lb/100ft2) Bottom Hole Static Temperature: (OF) Density: 9.8 (ppg) Volume: 242.70 (bbl) Slurry Data Fluid Type: FLUSH Slurry Interval: (ft) Water Source: Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Mud Data Stage No: 1 Slurry No: 1014 To: (ft) Description: Viscosified water w/ nutp Cmt Vol: 40.0 (bbl) Density: 8.30 (ppg) Slurry Vol: (sk) Water Vol: (bbl) Class: Yield: (ft3/sk) Other Vol: 0 Temperature: (OF) Temperature: (OF) Temper~ture: (OF) Time Compressive Strength 1: Compressive Strength 2: Purpose: SPACER Mix Water: (gal) Foam Job: N Temp (OF) (OF) Pressure (psi) (psi) Printed: 8/16/2005 6:59:27 AM Page 2 of 3 ConocoPhillips Alaska Cementing Report Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Report #: Start: Spud Date: 9/8/2003 Report Date: 9/8/2003 End: 9/23/2003 1 9/8/2003 Trade Name Type Stage No: 1 Slurry No: 1 of 4 - Additives Units Concentration Liquid Cone. Units Stage No: 1 Slurry No: 2 of 4 Slurry Data Fluid Type: FLUSH Slurry Interval: (ft) To: (ft) Water Source: Description: MUDPUSH XL Class: Cmt Vol: 50.0 (bbl) Density: 10.50 (ppg) Yield: (fP/sk) Slurry Vol: (sk) Water Vol: (bbl) Other Vol: () Purpose: SPACER Mix Water: (gal) Foam Job: N Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Temperature: CF} Temperature: (OF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Pressure (psi) (psi) Temp (OF) CF} Stage No: 1 Slurry No: 3 of 4 Slurry Data Fluid Type: LEAD Slurry Interval: 2,722.00 (ftJfo: 36.75 (ft) Water Source: Description: ASLite Cmt Vol: 405.0 (bbl) Slurry Vol:531 (sk) Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: ("F) Temperature: CF) Temperature: (OF) Temperature: (OF) Class: G Density: 10.50 (ppg) Yield: 4.28 (ft3/sk) Water Vol: 245.0 (bbl) Other Vol: () Purpose: FILLER CEM Mix Water: 19.39 (gal) Foam Job: N Time Compressive Strength 1: Compressive Strength 2: Pressure (psi) (psi) Temp (OF) (OF) Trade Name Stage No: 1 Slurry No: 3 of 4 - Additives Units D-53 D-46 D-79 S1 D-124 D-44 D-65 Type GYPSUM DEFOAMER EXTENDER ACCELERATOR FILLlTE ACCELERATOR DISPERSANT Concentration Units 30.00 %BWOC 0.60 %BWOC 1.50 %BWOC 1.50 %BWOC 43.10 %BWOC 9.00 %BWOW 0.50 %BWOC Liquid Cone. Printed: 8/16/2005 6:59:27 AM ~ ,,-/ ConocoPhillipsAlaska Cerne..,titng..··R·~·port Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Report #: Start: 1 9/8/2003 Stage No: 1 SlurryNo:4of4 Slurry Data Fluid Type: TAIL Description: Slurry Interval: 2,722.00 (ft}fo: 3,222.00 (ft) Cmt Vol: 47.5 (bbl) Water Source: Slurry Vol234 (sk) Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Temperature: (OF) Temperature: (OF) Temperature: (OF) Class: G Density: 15.80 (ppg) Yield: 1.16 (ft3/sk) Water Vol: 28.4 (bbl) Other Vol: 0 Time Compressive Strength 1: Compressive Strength 2: Trade Name Stage No: 1 SlurryNo:4of 4 - Additives D-46 D-65 S1 Type DEFOAMER DISPERSANT ACCELERATOR Casing Test Shoe Test Test Press: 2,500 (psi) For: 30 (min) Cement Found between Shoe and Collar: N Pressure: (ppge) Tool: N Open Hole: (ft) Hrs Before Test: Log/Survey Evaluation Concentration Units 0.20 %BWOC 0.30 %BWOC 2.00 %BWOC Liner Lap: Pas Test: (ppge) Neg Test: (ppge) Hrs Before Test: Cement Found on Tool: N Intel"pretationSummary CBL Run: N Under Pressure: (psi) Bond Quality: Cet Run: N Bond Quality: Temp Survey: N Hrs Prior to Log: Cement Top: (ft) How Determined: TOC Sufficient: N Job Rating: If Unsuccessful Detection Indicator: Remedial Cementing Required: N Number of Remedial Squeezes: Page 3 of 3 Spud Date: 9/8/2003 Report Date: 9/8/2003 End: 9/23/2003 Purpose: SHOE INTEG Mix Water: 5.10 (gal) Foam Job: N Temp rF) rF) Pressure (psi) (psi) Liquid Cone. Units Liner Top Test Tool: N Tool: N Printed: 8/16/2005 6:59:27 AM Page 1 of 2 ConocoPhillips Alaska, Inc. Daily Drilling Report I REPT NO. I DATE 5 9/8/2003 [CUM. TANGO CUM INT ANG WI MUD o CUM COST WI MUD 705,221 [JOB NUMBER [EVENT CODE 124 HRS PROG TMD I TVD [ DFS CD2-18 ODR 3,233.0 2,352.0 4.00 I RIG NAME & NO. [FIELD NAME I OCS NO. AUTH MD I DAILY TANG DoyonDríllinglnc19 ALPINE 16,661.0 0 ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD o DATE OF LAST SAFETY MEETING DAILY TOTAL 317,322 WELL NAME SUPERVISOR G.R. Whitlock CURRENT STATUS N/U BOPE 24 HR FORECAST N/U test BOPE. P/U d.:). and BHA RIH JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF INC AZIM I LAST CASING 53.510 271.880 9.625 (in) @ 3,221.0 (ft) DENSITY(ppg) 9.80 I PP I IECDI IMUD DATAl DAILYCOST I FV PVNP GELS WUHTHP FCIT.SOL OIL/WAT %Sand/MBT PhlpM 200 22/61 39/62 8.81 31 0.5/25.0 8.31 AUTH. AFE LITHOLOGY 10030338 I NEXT CASING 7.000 (in) @ 11,964.0 (ft) o I CUM COST I Pf/Mf CI Ca LAST BOP PRES TEST LAST SURVEY: DATE 9/7/2003 TMD 3,189.33 o LIME H2S ES 40 0.01/0 BIT NO. I 1 BHA LENGTH 978.08 CONN SIZE CONN TYPE BHANO. I 1 BHA WT. BELOW JARS BHA I HOLE CONDITIONS STRING WT. DN STRING WT. ROT TORQUE / UNITS NO JTS LENGTH O.D. J.D. 1 1.10 12.250 3.750 1 30.78 8.000 5.250 1 2.23 8.000 2.813 1 2.52 8.000 3.000 1 9.20 7.920 1.900 1 8.89 7.950 1.900 1 9.97 8.170 1.900 1 2.88 8.050 2.813 1 5.79 8.150 2.875 1 31.03 8.100 2.810 1 31.01 8.100 2.810 1 31.05 8.100 2.810 1 1.98 8.000 2.880 3 89.70 5.000 3.000 1 32.80 6.375 2.750 23 687.15 5.000 3.000 STRING WT. UP ITEM DESCRIPTION Bit Mud Motor Sub - Float Crossover MWD MWD MWD Sub - Bottom Hole Orienting Stabilizer - Non Mag Drill Collar - Non Mag Drill Collar - Non Mag Drill Collar - Non Mag Crossover Drill Pipe - Heavy Wgt Jars Drill Pipe - Heavy Wgt BITS DEPTH IN DATE IN I-O-D-L-B-G-O-R 114.0 9/4/20032-3-WT-G-E-I-PN-TD JETS OR TFA 12/16/16/18/1 SERIAL NO. 6016810 SIZE MANUF. TYPE 12.250 HUGHES-CHR MX-C1 BIT / RUN 1 I BIT OPERATIONS RPM I GPM I PRESS I P BIT I HRS I 24Hr DlST I 24Hr ROP I CUM HRS I CUM DEPTH I CUM ROP OPERATIONS SUMMARY PHASE DESCRIPTION SURFAC Stand back hwdp and jars to 168' SURFAC Stand back d.c.'s and UD stabilizer, UBHO, Download MWD, Break bit and adjust motor back to O. UD MWD tools and clear floor SURFAC R/U casers and hold pre-job safety meeting SURFAC RIH wI 9-5/8" 36#, J-55, BTC csing to 749' w/ insufficient returns. CBU RIH to 877' w/ no returns and taking wt. POOH to 833' and circulate down to 876'. Run casing to 920' wI no returns. Break circulation and wash casing to 1051 wI good returns. RIH to 1656' WOB BIT / RUN FROM TO HOURS CODE TROUBLE SUB 00:00 00:15 0.25 DRILL P TRIP 00:15 02:45 2.50 DRILL P TRIP 02:45 04:15 1.50 CASE P RURD 04:15 09:00 4.75 CASE P RUNC Printed: 8/16/2005 6:58:42 AM WELL NAME ConocoPhillips Alaska, Inc. DaUyDrilUngReport IJOB NUMBER IEVE~;~DE 124 HRS PROG IT~~233.0 ,-/ CD2-18 FROM TO HOURS CODE TROUBLE SUB 09:00 09:30 0.50 CASE P CIRC 09:30 12:00 2.50 CASE P RUNC 12:00 12:30 0.50 CASE P RUNC 12:30 15:00 2.50 CASE P CIRC 15:00 16:30 1.50 CEMENT P PUMP 16:30 17:30 1.00 17:30 18:30 18:30 19:30 19:30 21:00 21 :00 00:00 1.00 1.00 1.50 3.00 CEMENT P DISP .\-1 Page 2 of 2 TVD IDFS 2,352.0 4.00 I REPT NO. I DATE 5 9/8/2003 CASE P CASE P WELCTL P RIGMNT P DEQT RURD NUND RGRP OPERATIONS. SUMMARY PHASE DESCRIPTION SURFAC CBU @ 4 bpm-280 psi SURFAC Continue running 9-5/8" casing to 2845' wi good returns SURFAC Continue running 9-5/8" casing to 3182' M/U landing jt and landi casing @ 3221'. UD fillup tool and blowdown topdrive. RIU cement head SURFAC Circ and condition mud while reciprocating casing. PU=170k, S/O=125k. 5 bpm @ 230 psi. Hold safety meeting SURFAC Pump 40 bll viscosified water wi nutplug wi rig pump. Pump 5 bbl water wi dowell and test lines to 2500 psi. Drop bottom plug. Dowell pumped 40 bbl mud push @ 10.5 ppg 405 bbllead @ 10.7 ppg, and 48 bbl tail @ 15.8 ppg. Dropped top plug SURFAC Dowell pumped 20 bbl water. Pumped 222 bbl mud wi rig pump and bumped plug wi 1050 psi @ 17:08 hrs. Good returns throughout job. Circulated 225 bbl slurry to surface. SURFAC Check floats-OK. RlU and pressure test casing to 2500 psi for 30 min.-OK SURFAC RID casers. UD landing jt. Flush out surface riser SURFAC N/D surface riser. N/U unihead. CIO bales and top drive saver sub SURFAC Change out mud cross on BOP's. N/U BOPE 24 HR SUMMARY: Run 9-5/8" surface casing to 3221'. Circulate and condition mud. Cement wi 405 bbl Lead and 48 bbl Tail. Pressure test casing. N/D riser and N/U BOPE COMPANY Arctic Catering Inc. Doyon Drilling Inc Dowell Fairweather E&P Service Halliburton - Sperry-Sun ITEM Fuel Water, Drilling RESERVOIR NAME CD2-23 SERVICE UNITS gals bbls USAGE 1,225 1,430 PERSONNEL DATA NO. HOURS COMPANY 5 Halliburton - Sperry-Sun 26 M-I Drilling Fluids 2 Swaco 1 FMC Corporation Wellhe 2 PES I - Petroleum Equip SERVICE NO. HOURS 3 3 4 1 1 MATERIALS I CONSUMPTION ON HAND ITEM -3,946 Water, Potable -6,530 UNITS bbls USAGE 90 ON HAND -280 RESERVOIR AND INTERVAL DATA ZONE TOP BASE CD2-18 1615 3.8 1140 COMMENTS Printed: 8/16/2005 6:58:42 AM PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Doyon 19 I Date: 8/28/2003 I Volume Input Volume/Stroke I Pump used: I #2 Mud Pump I... ~ Strokes ~ 0.0840 Bbls/Strk ~ ... Pumping down annulus and DP. ... Well Name: CD2-18 Ri9: Drilling Supervisor: I Don Mickey Type of Test: I Casing Shoe Test lOT/FIT Hole Size: 8-1/2" \... Casing Shoe Depth RKB-CHF: 36.71Ft 3,221 1Ft-MOl 2,3851Ft-TVD Casina Size and Description: 19-5/8" 36#/Ft )-55 BTC Casina Test Mud Weight: Mud 10 min Gel: Test Pressure: Rotating Weight: BlocksfTop Drive Weight: Estimates for Test: Hole Depth 3,253IFt-MD I 2,401IFt-TVD 1"'1 9.8 ppg 14.0 Lb/100 Ft2 2,500 psi 75,000 Lbs 75,000 Lbs 2.3 bbls Pressure IntearitvTest Mud Weight: 9.6 ppg Mud 10 min Gel: 12.0 Lb/100 Ft2 Rotating Weight: 120,000 Lbs BlocksfTop Drive Weight: 75,000 Lbs Desired PIT EMW: 16.0 ppg Estimates for Test: 794 psi 0.7 bbls 1...1 1...1 EMW = Leak-off Pressure + Mud Weight = 800 + 9 6 0.052 x TVD 0.052 x 2385 . EMW at 3221 Ft-MD (2385 Ft-TVD) = 16.1 ppg PIT 15 Second Shut-in Pressure, psi 785 3000 . - Lost 25 psi during test, held 99% - = of test pressure. .' ~JJ ';u/l 1 1 1. 2500· ~ ..I'" /'" 2000· w a:: :;) CI) 1500- CI) W a:: Q. /. ., /~ 2 3 Barrels 4 0 5 10 15 20 25 30 Shut-In time, Minutes o PIT Point .....CASING TEST ---lEAK-OFF TEST Comments: Tested casing after bumping plugs and checking floats on cement job. Changed over to new LSND mud prior to PIT. Casing Test Pumping Strks psi o 0 2 25 4 50 6 150 8 300 10 425 12 650 14 800 16 950 18 1025 20 1200 22 1350 24 1475 26 1600 28 1750 30 1900 32 2050 34 2250 36 2400 37' 2525 Volume Pumped 3.1 tsbls Shut-in Min psi o 2525 1 2525 2 2525 3 2525 4 2525 5 2525 6 2525 7 2525 8 2525 9 2525 10 2525 15 2500 20 2500 25 2500 30 2500 Volume Bled Back 3.lltsbls Pump Rate: 0.5 Bbl/min ... Pressure Integrity Test Pumping Strks psi o 0 1 10 2 40 3 100 4 160 5 240 6 320 7 390 8 460 9 530 10 610 11 670 12 740 13 800 Volume Pumped 1.1 tsbls Shut-in Min psi o 790 0.25 785 0.5 785 1 785 1.5 77~ 2 7 2.5 760 3 760 3.5 755 4 750 4.5 750 5 750 5.5 750 6 745 6.5 745 7 740 7.5 740 8 740 8.5 735 9 735 9.5 735 10 7':- Volume Bled Back I tsbls '-- ~ Casing Detail 7" lnÞ::r:rned.!ate.. Casing ConocoPhillips Alaska Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN Doyon 19 RKB to LOS FMC 11" X 7" Hanger Jts 3 to 282 280 Jts 7" 26# L-80 STCM Csg 7" Weatherford Float Collar Jts 1 to 2 2 Jts 7" 26# L-80 STCM Csg 7" Ray Oil Tools Float Shoe(Silver bullet) 7" Shoe @ 12,112' TO of 8-1/2" hole @ 12,124' Total Centralizers: 61 Straight blade centz. one per j1 on jts # 1-12, 14,16,18,20,22,24,26,28,30,32 Straight blade centralizer one per jt on jts. # 207,208,& 209 21 0,212,214,216,218,220,222,224,226,228,230,232,234,236,238,24C 244,246,248,250,252,254,256,258,260,262,264,266 ,268 ,270 ,272 ,27 L 278, & 280' 295 joints in pipe shed - 282 total j1s. to run / last 13 joints stay out Top of Alpine C 11,958' MD - 7249' TVD Remarks: Use Best-a-Life 2000 pipe dope Drifted to 6.151" MU Torque 7,200 ft/lb Up Wi =325 K On Wt =140 K Block Wt=75 K Well: Date: LENGTH 34.60 1.67 11987.58 1.33 84.78 2.07 Supervisor: Don Mickey CD2-18 4/03 DEPTH TOPS 34.60 36.27 12023.85 12025.18 12109.96 12112.03 ConocoPhillips Alaska Casing Report Page 1 of 2 Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Report #: Start: 2 9/8/2003 Spud Date: 9/8/2003 Report Date: 9/14/2003 End: 9/23/2003 General Information String Type: Production Casing Hole TVD: 7,272.0 (ft) Ground Level: 15.90 (ft) Circ Hours: 2.50 (hr) Permanent Datum: KB-Datum: CF E!evation: Mud Lost: Kelly Bushing 52.00 (ft) (ft) (bbl) Hole Size: Water TMD: Liner Overlap: KB to Cutoff: 8.500 (in) (ft) (ft) 34.60 (ft) Hole TMD: Str Wt on Slips: Max Hole Ang!e: Days From Spud: 12,124.0 (ft) (Ibs) 82.69 n 10.00 (days) Casing Flange I Wellhead Manufacturer: FMC Hanger Model: Model: Horizontal U Packoff Model: Top Hub/Flange: (in) / 5,000 (psi) BTM Hub/Flange: (in) I 5,000 (psi) Actual TMD Set: 12,112.03 (ft) Integral Casing Detail Item Size Weight Grade Drift Threads JTS Length Top MU Torq. THO Manufacturer Model Condo Max 00 Min 10 Compo Name (in.) (Ib/ft) (in) (ft) (ft) (ft-Ibf) (in) (in) Casing Hanger 7.000 26.00 1.67 34.60 FMC Casing Hanger Casing 7.000 26.00 L-80 6.151 BTC-MOD 280 11,987.58 36.27 6.276 7" 26# L-80 Cas Float Collar 7.000 26.00 L-80 6.151 BTC-MOD 1.33 12,023.85 Y WEATHERFORD Float Collar Casing 7.000 26.00 L-80 6.151 BTC-MOD 2 84.78 12,025.18 Y 6.276 7" 26# L-80 Cas Float Shoe 7.000 26.00 L-80 BTC-MOD 2.07 12,109.96 Y RAY OIL TOOLS Float Shoe Non-Integral Casing Accessories Accessory Manufacturer Number Spacing (ft) Interval Top (ft) Bottom (ft) How Fixed Centering Guides RAY OIL TOOLS 61 122.0 12,068.0 Floating Remarks Run 7" 26# L-BO MBTC casing as follows: FS (Ray Oil Tool Silver bullet) 2 jts. - FC (Weatherford) - 2 jts. (first 4 connectioins BakerLoc - fill pipe & check floats on jt # 4) 71 jts. to 3207.71' (75 jts. total) Break circulation & circulate casing capacity - 4 bbls I min @ 240 psi - PU wt. 135 SO wt 115 Continue running 7" 26# L-BO MBTC casing - fl 3207' to 8123.56' - 190 jts. total Break circulation & circulate btms up - Start 4 bbls/min @ 630 psi Printed: 8/16/2005 6:59:53 AM ConocoPhillips Alaska Casing Report Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING 2 9/8/2003 Spud Date: 9/8/2003 Report Date: 9/14/2003 End: 9/23/2003 Report #: Start: Remarks Continue circulating btms up @ 8123' @ 4 bbls/min @ 410 psi final PU 250 SO 145 ..Continue to.run?" casing·f/8123' to 10,697' (250 jts tot~l) full returns while. runl1ing pipe Break circulation & circulate btms up + @ 10,697' 4 bbls/min @ 580 psi PU 325 SO 150 Finish running 7" casing f/1 0,697' to 12,075' (282 jts. total ran) PU hanger & landing jt. - Land casing in wellhead on FMC fluted hanger wi shoe @ 12,112' & FC @ 12,094' SO wt 145 Installed centering guides on jts. 1-12 then ever other jt. fl # 14 to # 32 then jts. # 207,208,&209 then every other jt fl # 212 to # 208 - 61 total Page 2 of 2 ( ( Printed: 8/16/2005 6:59:53 AM ConocoPhillips Alaska Cementing Report Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Primary Hole Size: 8.500 (in) TMD Set: 12,112 (ft) Date Set: 9/15/2003 Csg Type: Production Casing Csg Size: 7.000 (in.) Cmtd. Csg: Production Casing Cement Co: Dowell Schlumberger Rot Time Start: Rec Time Start: Time End: Time End: Type: Cement Casing Volume Excess %: 60.00 Meas. From: N/A Time Circ Prior To Cementing: 2.00 Mud Circ Rate: 210 (gpm) Mud Circ Press: 700 (psi) Report #: Start: 2 9/8/2003 Cement Job Type: Primary Squeeze Open Hole Hole Size: sa TMD: (ft) sa Date: sa Type: Cmtd. Csg: Squeeze Casing Hole Size: TMD Set: Date Set: Csg Type: sa TMD: sa Date: Cmtd. Csg: Page 1 of 3 Spud Date: 9/8/2003 Report Date: 9/15/2003 End: 9/23/2003 Plug Hole Size: Top Set: (ft) BTM set: (ft) Plug Date: Plug Type: Drilled Out: Cmtd. Csg: Cementer: Steve doughten Pipe Movement Pipe Movement: No movement RPM: SPM: Init Torque: Stroke Length: (ft-Ibf) (ft) Avg Torque: (ft-Ibf) Drag Up: (Ibs) Stage No: 1 of 1 Start Mix Cmt: 09:10 Start Slurry Displ: 09: 10 Start Displ: 09:20 End Pumping: 10:41 End Pump Date: 9/15/2003 Top Plug: Y Bottom Plug: Y Disp Avg Rate: Disp Max Rate: Bump Plug: Press Prior: Press Bumped: Press Held: Float Held: 5.50 (bbl/min) 7.00 (bbl/min) Y 790 (psi) 1,240 (psi) 10 (min) Y Max Torque: (ft-Ibf) Drag Down: (Ibs) Returns: 100 Total Mud Lost: Cmt Vol to Surf: 36.00 (bbl) (bbl) Mud Data Ann Flow After: N Mixing Method: Density Meas By: densemeter Type: Non-Disp. LS Density: 9.6 (ppg) Visc: 41 (s/qt) Bottom Hole Circulating Temperature: CF) Displacement Fluid Type:Mud PV/yP: 8 (cp)/18 (lb/100ft2) Gels 10 sec: 8 (lb/100ft2) Gels 10 min: 12 (lb/100ft2) Bottom Hole Static Temperature: (OF) Density: 9.6 (ppg) Volume: 457.00 (bbl) Slurry Data Fluid Type: FLUSH Slurry Interval: (ft) Water Source: Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: CF) Stage No: 1 Slurry No: 1 of 3 To: (ft) Description: CW100 Cmt Vol: 20.0 (bbl) Slurry Vol: (sk) Temperature: CF) Temper'3ture: (OF) Temperature: (OF) Density: 7.30 (ppg) Water Vol: (bbl) Class: Yield: (ft3/sk) Other Vol: 0 Time Compressive Strength 1: Compressive Strength 2: Purpose: Flush Mix Water: (gal) Foam Job: N Temp (OF) (OF) Pressure (psi) (psi) Printed: 8/16/2005 6:59:38 AM ----. ,-/ ConocoPhilHpsAlasl<a CementirngRöpört Page 20f 3 Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Report #: Start: 2 9/8/2003 Spud Date: 9/8/2003 Report Date: 9/15/2003 End: 9/23/2003 Stage No: 1 SlurryNo:2Ôf3 Slurry Data Fluid Type: Spacer Slurry Interval: (ft) To: (ft) Water Source: Description: MUDPUSH XL Class: Cmt Vol: 50.0 (bbl) Density: 12.50 (ppg) Yield: (ft3/sk) Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Purpose: SPACER Mix Water: (gal) Foam Job: N Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Temperature: CF) Temperature: (OF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Temp (OF) (OF) Pressure (psi) (psi) Stage No: .1SlurryNo:30f3 Slurry Data Fluid Type: PRIMARY Description: Slurry Interval: 12,112.00 (ff):>: 1 0,776.00 (ft~mt Vol: 54.0 (bbl) Water Source: Slurry Vol:252 (sk) Class: G Density: 15.80 (ppg) Yield: 1.16 (fP/sk) Water Vol: 30.8 (bbl) Other Vol: 0 Purpose: PRIMARY Mix Water: (gal) Foam Job: N Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Temperature: rF) Temperature: (OF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Temp (OF) rF) Pressure (psi) (psi) Stage No: 1 Slurry No: 30f 3 -Additives Trade Name Type DEFOAMER DISPERSANT Concentration 0.20% 0.25% 0.40 % 0.02% Units Liquid Cone. Units 0-46 0-65 0167 EX920 Printed: 8/16/2005 6:59:38 AM ConocoPhillips Alaska Cementing Report Page 3 of 3 Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRiLLING Report #: Start: 2 9/8/2003 Spud Date: 9/8/2003 Report Date: 9/15/2003 End: 9/23/2003 Casing Test Shoe Test Liner Top Test Test Press: 3,500 (psi) For: 30 (min) Cement Found between Shoe and Collar: N Pressure: (ppge) Tool: N Open Hole: (ft) Hrs Before Test: Liner Lap: Pas Test: (ppge) Neg Test: (ppge) Hrs Before Test: Cement Found on Tool: N Tool: N Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Under Pressure: (psi) Bond Quality: Cet Run: N Bond Quality: Temp Survey: N Hrs Prior to Log: Cement Top: (ft) How Determined: TOC Sufficient: N Job Rating: If Unsuccessful Detection Indicator: Remedial Cementing Required: N Number of Remedial Squeezes: Remarks Cement 7" casing as follows: Pumped 5 bbls CW100 - Test lines to 3500 psi - Pumped 15 bbls Cw100 @ 7.32 ppg 5 bbls/min @ 680 psi - Pumped 50.5 bbls Mud Push XL 12.75 ppg @ 6 bbls/min @ 600 psi - Dropped bottom plug - Mix & pumped 54 bbls Class G wi 0.2% D46, 0.25% D65, 0.40% D167, .02% XE902 @ 15.8 ppg 5.5 bbls/min @ 470 psi - Dropped top plug wi 20 bbls water fl Dowell- Switched to rig pumps & displaced wi 438 bbls 9.6 ppg LSND mud @ 7 to 3.5 bbls/min @ 340 to 790 psi - bumped plug wi 1240 psi - CIP @ 1041 hrs. Check floats OK Full returns while pumping job - unable to move pipe during job - lost approx. 36 bbls during job Printed: 8/16/2005 6:59:38 AM '- '-"'-'" Page 1 of 2 ConocoPhillips Alas;ka,lne. DailyD:ri lIimg.Repört I JOB NUMBER I EVENT CODE ¡ 24 HRS PROG TMD I TVD I DFS CD2-18 ODR 12,124.0 7,272.0 10.00 ¡RIG NAME & NO. I FIELD NAME 10CS NO. AUTH MD I DAILY TANG Doyon Drilling Inc 19 ALPINE 16,661.0 0 ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD I REPT NO. I DATE 11 9/14/2003 CUM. TANGO CUM INT ANG WI MUD o WELL NAME SUPERVISOR Don Mickey CURRENT STATUS Land 7" csg - RU to Circulate o DATE OF LAST SAFETY MEETING DAILY TOTAL 139,330 24 HR FORECAST Cmt 7" csg - Test BOPE - MU 61/8" BHA - RIH LITHOLOGY I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE 16.06 10030338 LAST SURVEY: DATE TMD INC AZIM I LAST CASING I NEXT CASING 9/13/2003 12,046.34 82.690 325.460 9.625 (in) @ 3,221.0 (ft) 7.000 (in) @ 12,112.0 (ft) DENSITY(ppg) 9.60 PP !ECD 11.82!MUDDATA DAILYCOSTj 0 CUM COST I FV PV/yP GELS WUHTHP FCIT.SOL OIUWAT %Sand/MBT Ph/pM Pf/Mf CI Ca H2S 44 8/26 14/16 4.6/10.0 1/ 0.2/13.8 9.1/ 0.10/0 40 CUM COST WI MUD 1 ,727,236 AUTH. LAST BOP PRES TEST 9/9/2003 o LIME ES BHANO. I 2 BHA WT. BELOW JARS BIT NO. I 2 BHA LENGTH 1,504.59 CONN SIZE CONN TYPE BHA I HOLECONDIJfIONS STRING WT. DN STRING WT.ROT STRINGWT. UP TORQUE I UNITS ITEM DESCRIPTION NO JTS 1 1 1 1 1 1 1 1 1 1 3 1 3 LENGTH 1.60 20.06 9.16 1.96 20.96 2.21 6.95 9.03 9.75 1.44 91.21 5.46 89.70 31.97 329.43 1.42 63.75 6.95 794.65 6.93 O:D. 8.500 7.625 6.750 6.750 6.700 6.750 6.750 6.750 6.750 6.700 6.500 6.880 5.000 6.200 5.000 6.380 4.000 5.280 4.000 5.270 I.D. 3.000 1.900 2.810 2.750 1.900 2.750 1.900 1.900 1.900 2.875 2.800 2.813 3.000 2.300 3.000 2.630 3.240 2.190 3.240 2.190 Bit Geo Pilot NM Pony Collar IB NM Stabilizer MWD-RLL,DGR,EWR,PWD IB NM Stabilizer MWD-HCIM MWD-HOC MWD-HOC NM Float Sub 3-NM Flex DC's IB NM Stabilizer 3 HWDP Drilling Jar - DNT 11 HWDP Crossover } Jts Drill Pipe Weatherford Ghost Reamer 25 Jts Drill Pipe Weatherford Ghost Reamer 11 1 2 1 25 1 BITS JETSORTFA 15/15/15/15/15/ SIZE MANUF. TYPE SERIAL NO. 8.500 SECURITY-DBSFSF2463 10566703 DEPTHINDATEIN I-O-D-L-B-G-O-R 3,233.0 9/9/20032-2-BT-A-1-I-EC-TD BIT / RUN 2/ 2 BIT OPERATIONS I GPM I PRESS I PBIT I HRS I 24HrDJST OPERATIONS SUMMARY PHASE INTRM 1 24HrROP j CUM HRS ICUM DEPTH I CUM ROP WOB RPM BIT I RUN CODE DRILL P TROUBLE SUB CIRC DESCRIPTION Circulate Hi-vis sweep - circ hole clean w/ 3X btms. up - standing back 1 std every 30 mins. f/ 11.904' to 11,523' w/ 550 gpm @ 2820 psi w/ 120 rpm's POOH on trip tank to 11,495' - pulling tight - MU top drive - pump out to 11 ,045' - switch over & POOH on trip tank to 7227' - work through tight spots FROM TO 00:00 02:30 HOURS 2.50 TRIP INTRM1 3.75 DRI LL P 02:30 06: 15 Printed: 8/1612005 6:59:07 AM Page 2 of 2 ConocoPhillips Alaska, Inc. Daily Drilling Report WELL NAME I JOB NUMBER I EVE~Dc~DE 124 HRS PROG TMD ITVD IDFS I REPT NO. ¡DATE CD2-18 12,124.0 7,272.0 10.00 11 i 9/14/2003 OPERATIONS SUMMARY FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION 02:30 06:15 3.75 DRILL P TRIP INTRM1 @ 11,096' & 11,072' - average drag 5 to 10 over 06:15 06:30 0.25 DRI LL P CIRC INTRM1 Pump dry job - blow down top drive 06:30 08:00 1.50 DRILL P TRIP INTRM1 Continue POOH on TT fl 7227' to 2931' - 5 to 10 drag - proper hole fill 08:00 08:15 0.25 DRILL P RIRD INTRM1 Remove GeoPilot skid fl rig floor - monitor well on TT 08:15 09:45 1.50 DRILL P TRIP I NTRM 1 Continue to POOH - LD ghost reamers - change handling equipment to 5" - std back HWDP & jars 09:45 12:00 2.25 DRILL P PULD INTRM1 Handle BHA - LD stab - std back NM flex DC's - Down load MWD & service GeoPilot - LD bit - GeoPilot - remove pUlser & LD MWD - clean up rig floor 12:00 12:30 0.50 DRILL P OTHR INTRM1 PU stack washer & flush BOP stack 12:30 14:30 2.00 WELCTL P EQRP INTRM1 Pull wear bushing - set test plug - Change top pipe rams to 7" & test to 250 & 5000 psi - pull test plug & set thin wall wear bushing 14:30 15:30 1.00 CASE P RURD INTRM1 RU to run 7" casing - Held PJSM 15:30 18:30 3.00 CASE P RUNC INTRM1 Run 7" 26# L-80 MBTC casing as follows: FS (Ray Oil Tool Silver bullet) 2 jts. - FC (Weatherford) - 2 jts. (first 4 connectioins BakerLoc - fill pipe & check floats on jt # 4) 71 jts. to 3207.71' (75 jts. total) 18:30 19:00 0.50 CASE P CIRC INTRM1 Break circulation & circulate casing capacity - 4 bbls 1 min @ 240 psi - P}..J wt. 135 SO wt 115 19:00 23:00 4.00 CASE P RUNC INTRM1 Continue running 7" 26# L-80 MBTC casing - fl 3207' to 8123.56' - 190 jts. total 23:00 00:00 1.00 CASE P CIRC INTRM1 Break circulation & circulate btms up - Start 4 bbls/min @ 630 psi 24 HR SUMMARY: Circulate hole clean - pump out to 11,045' - POOH on TT - hole in good condition - LD BHA - RU RU & run 7" casing - Run casing to 8123 (190 j'is,) Circ @ 3207' & 8123' COMPANY Arctic Catering Inc. Doyon Drilling Inc Dowell Fairweather E&P Service Halliburton - Sperry-Sun SERVICE PERSONNEL DATA NO. HOURS COMPANY 5 Halliburton - Sperry-Sun 26 M-I Drilling Fluids 2 Swaco 1 FMC Corporation Well he 2 SERVICE NO. HOURS 2 3 4 1 ITEM UNITS gals bbls USAGE 1 ,425 450 MATERIALS I CONSUMPTION ON HAND ITEM -12,040 Water, Potable -12,670 UNITS bbls USAGE 120 ON HAND -1,000 Fuel Water, Drilling RESERVOIR NAME CD2-23 RESERVOIR AND INTERVAL DATA ZONE TOP BASE CD2-18 612 3.5 1280 COMMENTS Printed: 8/16/2005 6:59:07 AM PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Doyon 19 Date: 9/15/2003 Volume Input pump used: 1 Cement Unit I'" € Barrels ... .., Pumping down annulus. .., I Rig: I Drilling Supervisor: Don Mickey Type of Test: I Annulus Leak Off Test for Disposal Adequacy Hole Size: 8-1/2" \.... Casing Shoe Depth RKB-CHF: 36.71Ft 3,221 1Ft-MOl 2,385IFt-TVD Casina Size and Description: 19-5/8" 36#/Ft J-55 BTC .Chanaes for Annular Adeauacv Test Juter casing shoe test results in comments Description references outer casing string. ;ize is that drilled below outer casing. ;timated TOC for Hole Depth. Enter inner casing 00 at right Well Name: CD2-18 Hole Depth 1 0,7761 Ft-MD I 6,846IFt-TVD 1....\ Pressure IntearitvTest Mud Weight: 9.6 ppg Inner casing 00: 7.0 In. Desired PIT EMW: Estimates for Test: 14.5 ppg 608 psi 0.6 bbls 1....1 \....1 EMW = Leak-off Pressure + Mud Weight = 625 + 9 6 0.052 x TVD 0.052 x 2385 . EMW at 3221 Ft-MD (2385 Ft-TVD) = 14.6 PIT 15 Second Shut-in Pressure, psi 488 1000· w IX :J t/) t/) w IX 0.. 5 Shut-In time, Minutes o PIT Point 2 3 4 5 Barrels 6 8 10 0 7 9 .....CASING TEST ---LEAK-OFF TEST Comments: 9-5/8" casing shoe tested to 16.1 ppg EMW when drilled out. Bbls/Strk ... Pump Rate: 0.5 Bbl/min ... Casing Test Pumping Shut-in Bbls psi Min psi 10 Volume Pumped 0.0 tsbls Volume Bled Back I tsbls Pressure Integrity Test Pumping Shut-in Bbls psi Min psi 0 0 0 515 0.5 98 0.25 488 1 155 0.5 479 1.5 208 1 464 2 263 1.5 44( 2.5 299 2 43~ 3 345 2.5 424 3.5 381 3 408 4 415 3.5 405 4.5 437 4 400 5 472 4.5 391 5.5 500 5 384 6 541 5.5 378 6.5 596 6 372 7 625 6.5 367 7.5 607 7 362 8 600 7.5 357 8.5 576 8 352 9 564 8.5 347 9.5 515 9 343 9.5 338 10 3t Volume Pumped 9.t) tsbls Volume Bled Back Itsbls ConocriPhillips Casing Detail 9518" Surface Casino Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN Doyon 19 RKB to Landing Ring FMC Gen V Hanger Jts 3 to 79 77 Jts 9-5/8" 36# J-55 BTC Csg Davis Lynch Float Collar Jts 1 to 2 2 Jts 9-5/8" 36# J-55 BTC Csg Ray Oil Tools "Silver Bullet" Float Shoe TO 12 1/4" Surface Hole RUN TOTAL 45 BOWSPRING CENTRALIZERS - 1 per jt on Jt #1 - #12 (One stop ring on Jt #2) and over co.llars on jts# 14, 16, 18, 20, 22, 24, 26, 28, 30, 32, 34, 36, 3ß,40, 42,44,46,48, 50, 52, 54,56, 58,60,62 64,64,66,613,70,72,74,76,78 86 joints in the pipe shed. Run 79 joints -7 - joints stay out Use Best-o-Ufe 2000 pipe dope Remarks: Up Wt - 175 k On Wt - 125 k Block Wt - 75k Supervisor: D. Bur/ey / D. Mickey Well: Date: LENGTH 36.70 2.19 3175.15 1.48 84.11 2.30 CD2-31 6/7/2004 DEPTH TOPS 36.70 38.89 3214.04 3215.52 3299.63 3301.93 3312.00 ConocoPhillips Alaska Casing Report Legal Well Name: CD2-31 PB1 Common Well Name: CD2-31PB1 Event Name: ROT - DRILLING Report #: Start: 1 6/5/2004 General Information String Type: Surface Casing Hole TVD: 2,372.0 (ft) "." -Braund Level: 15:90 (ft) Circ Hours: 2.00 (hr) Permanent Datum: Rotary Table Hole Size: 12.250 (in) KB-Datum: 0.84 (ft) Water TMD: (ft) .'- ···C¡:; E!9'!ation: (ft) Liner· ·Overlap: (ft) Mud Lost: (bbl) KB to Cutoff: 36.70 (ft) Casing Flange! Wellhead Manufacturer: FMC Hanger Model: Model: Producer Packoff Model: Actual TMD Set: 3,301.93 (ft) Integral Casing Detail Item Size Weight Grade Drift Threads JTS Length Top MU Torq. THD Manufacturer (in.) (I bItt) (in) (ft) (ft) (ft"lbf) Casing Hanger 9.625 8.765 2.19 36.70 Casing 9.625 36.00 J-55 8.765 BTC 77 3,175.15 38.89 Float Collar 9.625 BTC 1.48 3,214.04 Y WEATHERFORD Casing 9.625 36.00 J-55 8.765 BTC 2 84.11 3,215.52 Y Float Shoe 9.625 BTC 2.30 3,299.63 Y RAY OIL TOOLS 3,301.93 Non-Integral Casing Accessories Accessory Manufacturer Spacing (ft) Number Bowspring Centralizer Bowspring Centralizer WEATHERFORD WEATHERFORD 12 33 Remarks Page 1 of 1 Spud Date: 6/5/2004 Report Date: 6/7/2004 End: 7/2/2004 Hole TMD: Str Wt on Slips: Max Hole Ang!a: Days From Spud: 3,312.0 (ft) (Ibs) 61.81 n 2.25 (days) ( Top Hub/Flange: (in) / (psi) BTM Hub/Flange: (in) / (psi) Model Condo Max OD Min ID Comp.Name (in) (in) Casing Hanger 8.921 95/8" 36# J-55 Float Collar 8.921 95/8" 36# J-55 Float Shoe { " Interval How Fixed Top (ft) 2,838.0 77.0 Bottom (ft) 3,292.0 OverCollar 2,760.0 OverCollar Run 9 5/8" 36# J-55 BTC casing as follows: FS, 2 jts. FC, 2 jts. (BakerLoc 1 st four connections - fill pipe - circ & check floats) - 36 jts. (40 total) to 1624' - Circulate btms up 4 bbls/min @ 260 psi - PU 130 SO 100 - Continue running csg f/1624' to 3263' - 39 jts (79 total) - PU hanger & landing jt. - Land casing w/ FMC fluted hanger w/ shoe @ 3302' - FC @ 3214' Printed: 8/16/2005 7:04:00 AM ConocoPhillips Alaska Cementing Report Legal Well Name: CD2-31 PB1 Common Well Name: CD2-31PB1 Event Name: ROT - DRILLING Primary Hole Size: 12.250 (in) TMD Set: 3,302 (ft) Date Set: 6/7/2004 Csg Type: Surface Casing Csg Size: 9.625 (in.) Cmtd. Csg: Surface Casing Cement Co: Dowell Schlumberger Rot Time Start: Rec Time Start:21 :00 Report #: Start: 1 6/5/2004 Cement Job Type: Primary Squeeze Open Hole Hole Size: sa TMD: (ft) sa Date: sa Type: Cmtd. Csg: Squeeze Casing Hole Size: TMD Set: Date Set: Csg Type: sa TMD: sa Date: Cmtd. Csg: Cementer: Steve Daughton Pipe Movement Pipe Movement: Reciprocating Time End: Time End: 00:30 RPM: SPM: Init Torque: (ft-Ibf) Stroke Length: 25.0 (ft) Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf) Drag Up: 150,000 (Ibs) Drag Down: 125,000 (Ibs) Type: Cement Casing Volume Excess %: 167.00 Meas. From: 130 Time Circ Prior To Cementing: 1.50 Mud Circ Rate: 252 (gpm) Mud Circ Press: 260 (psi) Start Mix Cmt: 23:07 Start Slurry Displ: 23:07 Start Displ: 00:14 End Pumping: 00:53 End Pump Date: 6/8/2004 Top Plug: Y Bottom Plug: Y Type: Spud Mud Density: 9.6 (ppg) Vise: ~~5 (s/qt) Bottom Hole Circulating Temperature: rF) Displacement Fluid Type:Mud Slurry Data Fluid Type: FLUSH Slurry Interval: (ft) Water Source: lake Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: rF) Stage No: 1 of 1 Disp Avg Rate: Disp Max Rate: Bump Plug: Press Prior: Press Bumped: Press Held: Float Held: 7.00 (bbl/min) 7.00 (bbl/min) Y 700 (psi) 1,100 (psi) 10 (min) Y Page 1 of 3 Spud Date: 6/5/2004 Report Date: 6/7/2004 End: 7/2/2004 Plug Hole Size: Top Set: (ft) BTM set: (ft) Plug Date: Plug Type: Drilled Out: Cmtd. Csg: Returns: 100 Total Mud Lost: (bbl) Cmt Vol to Surf: 130.00 (bbl) Ann Flow After: N Mixing Method: Density Meas By: Densemeter PVIYP: 23 (cp)/16 (lb/100ft2) Gels 10 see: 5 (lb/100ft2) Gels 10 min: 10 (lb/100ft2) Bottom Hole Static Temperature: (OF) Density: 9.6 (ppg) Volume: 228.40 (bbl) Mud Data Stage No: 1 Slurry No: 1 of 4 To: (ft) Description: Biozan water w/ nut plug Cmt Vol: 40.0 (bbl) Density: 8.30 (ppg) Slurry Vol: (sk) Water Vol: (bbl) Class: Yield: (ft3/sk) Other Vol: 0 Temperature: (OF) Temperature: (OF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Purpose: Flush & marke Mix Water: (gal) Foam Job: N Temp (OF) (OF) Pressure (psi) (psi) Printed: 8/16/2005 7:03:22 AM ~ ConocoPhillipsAtask:a Cementing Re'pøl1: Legal Well Name: CD2-31 PB1 Common Well Name: CD2-31 PB1 Event Name: ROT - DRìLLlNG Page 2 of 3 Report #: Start: 1 6/5/2004 Spud Date: 6/5/2004 Report Date: 6/7/2004 End: 7/2/2004 Stage No: 1 SlurryNo:2of4 Slurry Data Fluid Type: Spacer Slurry Interval: (ft) To: (ft) Water Source: lake Description: MUDPUSH XL Class: Cmt Vol: 44.0 (bbl) Density: 10.50 (ppg) Yield: (ft3/sk) Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Temperature: (OF) Temperature: (OF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Temp (OF) (OF) Stage No: 1 Slurry No: 30f4 Slurry Data Fluid Type: LEAD Slurry Interval: 2,802.00 (ftJTo: (ft) Water Source: lake Description: ASLite Cmt Vol: 394.0 (bbl) Slurry Vol:507 (sk) Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Temperature: (OF) Temperature: COF) Temperature: (OF) Class: Density: 10.70 (ppg) Yield: 4.28 (ft3/sk) Water Vol: 243.0 (bbl) Other Vol: 0 Time Compressive Strength 1: Compressive Strength 2: Temp (OF) (OF) Stage No:.1 .SlurryNo: 4of4 Slurry Data Fluid Type: TAIL Description: Slurry Interval: 3,302.00 (ftJTo: 2,802.00 (ft) Cmt Vol: 50.0 (bbl) Water Source: lake Slurry Vol:240 (sk) Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Temperature: COF) Temperature: (OF) Temperature: COF) Class: G Density: 15.80 (ppg) Yield: 1.17 (fP/sk) Water Vol: 30.0 (bbl) Other Vol: 0 Time Compressive Strength 1: Compressive Strength 2: Temp COF) (OF) Trade Name Stage No: 1 Slurry No:4of4 -Additives LiquidConc. D-46 D-65 S1 Type DEFOAMER DISPERSANT ACCELERATOR Concentration Units 0.20 %BWOC 0.30 %BWOC 1.00 %BWOC Purpose: SPACER Mix Water: (gal) Foam Job: N Pressure (psi) (psi) Purpose: PRIMARY Mix Water: 20.00 (gal) Foam Job: N Pressure (psi) (psi) Purpose: PRIMARY Mix Water: 5.00 (gal) Foam Job: N Pressure (psi) (psi) Units Printed: 8/16/2005 7:03:22 AM ConocoPhillips Alaska Cementing Report Page 3 of 3 Legal Well Name: CD2-31 PB1 Common Well Name: CD2-31 PB1 Event Name: ROT - DRILLING Report #: Start: 1 6/5/2004 Spud Date: 6/5/2004 Report Date: 6/7/2004 End: 7/2/2004 Casing Test Shoe Test Liner Top Test Test Press: 2,500 (psi) For: 30 (min) Cement Found between Shoe and Collar: N Pressure: (ppge) Tool: N Open Hole: (ft) Hrs Before Test: Liner Lap: Pos Test: (ppge) Neg Test: (ppge) Hrs Before Test: Cement Found on Tool: N Tool: N Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Under Pressure: (psi) Bond Quality: Cet Run: N Bond Quality: Temp Survey: N Hrs Prior to Log: Cement Top: (ft) How Determined: TOC Sufficient: N Job Rating: If Unsuccessful Detection Indicator: Remedial Cementing Required: N Number of Remedial Squeezes: Remarks Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water w/ nut plug for marker wi rig pumps - Switch to Dowell - Pumped 2 bbls water - Test lines to 2500 psi - Drop bottom plug - Mixed & pumped 50 bbls Mud Push XL @ 10.5 ppg - Mixed & pumped Lead slurry ( AS lite3) @ 10.7 ppg - Observed nut plug marker @ sharkers wi 375 bbls lead pumped - pumped 394 bbls total of lead slurry - Prep to switch to tail slurry Mixed & pumped Tail slurry (G wi .2% 0046, .3% 0065, & 1 % S002) @ 15.8 ppg - Dropped top plug wi 20 bbls water fl Dowell - Switch to rig pumps & displace cement wi 228.4 bbls 9.6 ppg mud @ 7 B/M f/ 420 to 790 psi - slowed pumps to 3 1/2 81M for last 18.4 bbls of displacment - Bumped plug wI 1100 psi - CIP @ 0053 hrs. - Full circulation throughout wi 130 bbls. 10.7 ppg cement reutrns to surface Printed: 8/16/2005 7:03:22 AM I JOB NUMBER EVENT CODE 124 HRS PROG TMD I TVD DFS C02-31 OOR 149.0 3,312.0 2,368.0 2.25 SUPERVISOR I RIG NAME & NO.; I FIELD NAME I OCSNO. AUTH MD I DAILY TANG O. Burley / O. Mickey Doyon Drilling Inc 19 ALPINE 18,682.0 0 CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INTW/O MUD Prep to test BOPE 0 24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL Test BOPE- PU OP - MU BHA#2 - RIH - FIT - Drill 8 1/2" hole 6/7/2004 205,298 LITHOLOGY I JAR "IRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE 10034643 LAST SURVEY: DATE TMD INC AZIM I LAST CASING I NEXT CASING 6/7/2004 3,262.53 61.257 266.810 9.625 (in) (ã2 3,302.0 (ft) 7.000 (in) ~ 13,737.0 (ft) DENSITY(ppg) I 9.60 I PP I I ECD I I MUD DATAl DAILY COST 0 I CUM COST I FV PV/yP GELS WUHTHP FC/T.SOL OIL/WAT %Sand/MBT Ph/pM Pf/Mf CI Ca H2S 300 34/82 42/95 7.4/ 3/ / 0.5/27.5 8.7/ 0.01/0 20 BHANO. 1 BHA/HOLECONDITIONS BHA WT. BELOW JARS STRING WT. UP STRING WT. DN STRINGWT.ROT 24,568 140 120 130 ITEM DESCRIPTION NO JTS LENGTH 1 1.00 1 31.10 1 2.47 1 5.92 1 2.44 1 9.17 1 8.70 1 9.90 1 3.00 1 31.03 1 31.03 1 30.80 1 3.02 3 89.85 1 32.70 23 685.15 -- ConocoPhillipsAlaska, Inc. Daily DrUllng ReiPort WELL NAME Bit Mud Motor Sub - Float Stabilizer Crossover - NonMag MWO MWO MWD Sub - Bottom Hole Orienting Drill Collar - NonMag Drill Collar - NonMag Drill Collar - Non Mag Crossover Drill Pipe - Heavy Wgt Jars Drill Pipe - Heavy Wgt BITS BIT / RUN SIZE MANUF. TYPE 1/ 12.250 HUGHES-CHR MX-C1 BIT / RUN WOB RPM GPM 1 / 20 / 30 /80 656 SERIAL NO. 5044528 JETS OR TFA 12/16/16/18/1 BIT OPERATIONS PRESS PBIT HRS 2,600 673 1.04 M.D. INCL. 3,209.94 60.927 SURVEY DATA AZIMUTH T.V.D.; NIS CUM EIW CUM SECTION M.D. INCL. 268.030 2,319.17 -59.69 -1,807.4 1,678.38 3,262.53 61.257 '"--,,, O.D. 12.250 8.000 8.000 8.150 8.140 8.020 8.020 8.090 8.100 2.812 8.062 8.062 6.750 5.000 6.130 5.000 TORQUE 1 UNITS 8,500 ft-Ibf I.D. 4.500 5.000 2.870 2.875 2.875 3.500 1.920 1.900 2.813 2.875 2.880 2.880 2.780 3.000 2.500 3.000 Page 1 of 3 REPT NO. JDATE 3 6/7/2004 CUM. TANGO CUM INT ANG WI MUD o CUM COST WI MUD 581,605 AUTH. LAST BOP PRES TEST o LIME ES BIT NO. I 1 BHALENGTH 977.28 CONN SIZE CONN TYPE DEPTHIN DATE IN I-O-D-L-B-G-O-R 114.0 6/5/20041-1-WT-Ä-E-1-NO-TO 24Hr'DIST 149.0 24Hr ROP 143.27 CUM HRS CUM DEPTH CUM ROP 21.56 3,198.0 148.33 AZIMUTH T.V.D. N/SCUM EIWCUM SECTION 266.810 2,344.60 -61.76 -1,853.4 1,720.90 NO. 1 2 MAKE OF PUMP Continental Emsco Continental Emsco PUMP I HYDRAULIC DATA STROKE (in) LINER (in) SPM Q (gpm) PRESS. (psi) 12.000 6.000 75 317.26 2,600 12.000 6.000 80 338.41 2,600 TOTAL Q 655.67 655.67 KILL SPM I PRESSURE Printed: 8/16/2005 7:02:23 AM Page 2 of 3 CD2-31 ConocoPhillips Alaska, Inc. Daily Drilling Report I JOB NUMBER I EVENT CODE 124 HRS PROG I TMD ODR 149.0 3,312.0 TVD IDFS 2,368.0 2.25 REPT NO. [DATE 3 6/7/2004 WELL NAME OPERATIONS SUMMARY FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION 00:00 01 :15 1.25 DRILL P DRLG SURFAC Drill 12 1/4" hole from 3162' to 3312' MD 2368' TVD WOB 20/30 k RPM 80 GPM 650 @ 2500 psi String wt. PU 140 SO 120 Rot. 130 Torque on/off btm - 8,500/7,500 ft. Ibs. ADT - 1.04 hrs.= ART - 0.7 hrs. AST - 0.34 hrs. 01 :15 02:30 1.25 DRI LL P CIRC SURFAC CBU @ 650 gpm /2400 psi 180 rpm, pumped 40 bbls low vis sweep and circ hole clean. 02:30 04:15 1.75 DRI LL P WIPR SURFAC Backream from 3312' to 2270' - 400 gpm /1120 psi / 80 rpm. Circ BU to clean hole while Backreaming from 2270' to 2175'. 04:15 05:30 1.25 DRILL P WIPR SURFAC Continue to backream from 2175' to 1670' - 400 gpm I 1100 psi 180 rpm. CBU on last stand to clean up hole. 05:30 06:30 1.00 DRILL P WIPR SURFAC RIH, precautionary wash and ream from 3230' to 3312'. 06:30 08:00 1.50 DRI LL P CIRC SURFAC CBU - 675 gpm / 2600 psi 180 rpm, pumped 40 bblls high vis sweep and circ hole clean. Flow check well, static. 08:00 09:00 1.00 DRILL P TRIP SURFAC POOH on trip tank from 3312' to 1650' with 5-8K over, began pulling tight @ 1650'. Worked up to 1640' with several attempts to 50k over. 09:00 11 :00 2.00 DRILL Np DH TRIP SURFAC Backream from 1670' to 970' - 500 gpm I 1400 psi I 80 rpm. CBU on last stand - heavy cuttings load back. Flow check well, static. 11 :00 14:15 3.25 DRILL P PULD SURFAC Stand back hwdp and flex collars -lay down UBHO, mwd, stab, motor and bit. Clean up trip mess and clear tools from rig floor. 14:15 15:15 1.00 CASE P RURD SURFAC RU to run 9 5/8" surface casing 15:15 15:30 0.25 CASE P SFTY SURFAC Held PJSM with crew. 15:30 21:00 5.50 CASE P RUNC SURFAC Run 9 5/8" 36# J-55 BTC casing as follows: FS, 2 jts. FC, 2 jts. (BakerLoc 1 st four connections - fill pipe - circ & check floats) - 36 jts. (40 total) to 1624' - Circulate btms up 4 bbls/min @ 260 psi - PU 130 SO 100 - Continue running csg fl 1624' to 3263' - 39 jts (79 total) - PU hanger & landing jt. - Land casing wi FMC fluted hanger wi shoe @ 3302' - FC @ 3214' 21:00 22:30 1.50 CEMENT P CIRC SURFAC Rig down casing equipment - RU cmt head & lines - Circulate & condition for cement job -ICP 300 psi @ 3 B/M - FCR - 270 psi @ 6 B/M - PU 150 SO 125 22:30 00:00 1.50 CEMENT P PUMP SURFAC Cement 95/8" casing as follows: Pumped 40 bbls Biozan water w/ nut plug for marker w/ rig pumps - Switch to Dowell - Pumped 2 bbls water - Test lines to 2500 psi - Drop bottom plug - Mixed & pumped 50 bbls Mud Push XL @ 10.5 ppg - Mixed & pumped Lead slurry (AS Iite3) @ 10.7 ppg - Observed nut plug marker @ sharkers wi 375 bbls lead pumped - pumped 394 bbls total of lead slurry - Prep to switch to tail slurry 24 HR SUMMARY: Drill 12 1/4" hole fl 3162' to 3312' MD - Pump sweep & circulate hole clean - Wiper trip to 1670' -RIH - pump sweep and circ clean- POOH, lay down BHA - RU and Run 95/8" casing.- Cmt csg. COMPANY ConocoPhillips Company Fairweather E&P Service Doyon Drilling Inc Arctic Catering Inc. Dowell Halliburton - Sperry-Sun SERVICE PERSONNEL DATA NO. HOURS COMPANY 1 Halliburton - Sperry-Sun 1 Halliburton - Sperry-Sun 27 M-I Drilling Fluids 5 Swaco 2 FMC Corporation Wellhe 2 SERVICE NO. HOURS 2 1 3 4 1 Printed: 8/16/2005 7:02:23 AM WELL NAME ITEM Fuel Water, Drilling RESERVOIR NAME CD2-12 CD2-31 UNITS gals bbls CD2-31 "'-". USAGE 1,344 350 ConocoPhilllpsAlaska,lhb. DailyDl"illingReport IJOB NUMBER ! eVENT CODe /24 HRS PROG ·ITMD ODR 149.0 3,312.0 MATERIALS.I·CONSUMPTION ON HAND ITEM -3,815 Water, Potable -3,370 Fuel, Camp \......,/ ITVD I DFS 2,368.0 2.25 UNITS bbls gals RESERVOIR AND INTERVAL. DATA ZONE TOP BASE 933 3.5 1440 COMMENTS Page 3 of 3 /REPT NO. ¡DATE 3 6/7/2004 USAGE 120 ON HAND -360 Printed: 8/16/2005 7:02:23 AM Well Name: Drilling Supervisor: Type of Test: OpenholeTest LOTIFIT CD2-31 Ri9: Burley / Mickey PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Doyon 19 Date: 6/9/2004 Pump used: I #2 Mud Pump \. ... Pumping down annulus and DP. .... Volume Input Volume/Stroke Pump Rate: 6.0 Strk/min ... Strokes ..., O. 1 000 Bbls/Strk ..., Casing Test Pressure Integrity Test Hole Size: 8-112" \. Casing Shoe Depth I Hole Depth Pumping Shut-in Pumping Shut-in RKB-CHF: 36.71Ft 3,302 1Ft-MOl 2,3671 Ft-TVD 3,332IFt-MD I 2,378LFt-TVD Strks psi Min psi Strks psi Min psi Casing Size and Description: \9-5/8" 36# 1Ft J-55 BTC 1·\ 0 0 0 2500 0 0 0 800 Caslna Test .Pressure IntearitvTest 2 50 1 2500 2 60 0.25 650 Mud Weight: 9.6 ppg Mud Weight: 9.5 ppg 4 150 2 2500 4 205 0.5 610 Mud 10 min Gel: 13.0 Lb/100 Ft2 Mud 10 min Gel: 13.0 Lb/100 Ft2 6 300 3 2500 6 400 1 580 Test Pressure: 2,500 psi Rotating Weight: 115,000 Lbs 8 500 4 2500 8 600 1.5 570 Rotating Weight: 75,000 Lbs BlocksfTop Drive Weight: 75,000 Lbs 10 700 5 2500 10 750 2 f BlocksfTop Drive Weight: 75,000 Lbs Desired PIT EMW: 18.0 ppg 12 900 6 2500 12 850 2.5 5~v Estimates for Test: 2.4 bbls Estimates for Test: 1046 psi 1 bbls 14 1100 7 2500 14 870 3 550 1·\ 1·1 16 1240 8 2500 16 900 3.5 545 EMW = Leak-off Pressure + Mud Weight = 850 2367 + 9.5 PIT 15 Second 18 1400 9 2500 18 4 540 0.052 x TVD 0.052 x Shut-in Pressure, psi 20 1550 10 2500 20 4.5 540 EMW at 3302 Ft-MD (2367 Ft-TVD) = 16.4 ppg 650 22 1700 15 2500 5 540 3000 - - Lost 0 psi during test, held 100% - 24 1900 20 2500 5.5 540 _ of test pressure. 26 2050 25 2500 6 540 ..~;J. Ur¡.l 1 I 28 2250 30 2500 6.5 535 2500· / ;. A .. 30 2450 7 530 31 2500 7.5 520 .. 8 515 2000 - 8.5 515 w / ~ 9 515 :;) 515 rn 1500 - . 9.5 rn - 10 5" w .lilt ~ Q. 2 Barrels .....CASING TEST ---LEAK-OFF TEST 4 0 5 10 15 20 25 30 Shut-In time, Minutes o PIT Point Volume Pumped 3.1 Bbls Volume Bled Back IBbls Volume Pumped 2.0 Bbls Volume Bled Back IBbls Comments: Tested 9 5/8" casing after bumping plugs on cement job. conoc6Phillips Casing Detail 7" Casina Well: Date: Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH Doyon 19 RKB to Landing Ring FMC Gen V Hanger Jts 3 to 321 319 Jts 7" 26# L~80 BTCM Csg Davis Lynch Float Collar Jts 1 to 2 2 Jts 7" 26# L-80 BTCM Csg Ray Oil Tools "Silver Bullet" Float Shoe 34.84 2.40 13471.62 1.30 86.15 2.10 TO 8 1/2" Hole Total Centralizers: 94 Straight blade centralizer one per jt on jts # 1-14 Straight blade centralizer one per jt on jts. # 243,244,245 Straight blade centralizer one per jt on every other joint Starting @ # 247 to # 279 Straight bla.de centralizer 2 per jt on jts 282 - 303 wI stop collars Straight blade centralizer one per jt on jts # 303 - 319 ** 330 joints in shed - 321 total jts. to run Last 9 jts. out Use Best-a-Life 2000 pipe dope Remarks: Up Wt - 350.+ k On Wt - 145'k Block Wt - 75k ** Did not install stop rings on jts #304 - 319 due to csg trying to stick in hole. Only 1 cent per jt. Supervisor: D. Lutrick / L. Hill CD2-31 6/19/2004 DEPTH TOPS 34.84 37.24 13508.86 1351 O. 16 13596.31 13598.41 13608.00 ConocoPhillips Alaska Cementing Report Legal Well Name: CD2-31 PE1 Common Well Name: CD2-31PB1 Event Name: ROT - DRILLING Primary Hole Size: 8.500 (in) TMD Set: 13,598 (ft) Date Set: 6/19/2004 Csg Type: Production Casing Csg Size: 7.000 (in.) Cmtd. Csg: OPEN HOLE Cement Co: Dowell Schlumberger Rot Time Start: Rec Time Start: Time End: Time End: Type: Cement Casing Volume Excess %: 40.00 Meas. From: N/A Time Circ Prior To Cementing: Mud Circ Rate: 294 (gpm) Mud Circ Press: 1,000 (psi) Report #: Start: 3 6/5/2004 Cement Job Type: Primary Squeeze Open Hole Hole Size: sa TMD: (ft) sa Cate: sa Type: Cmtd. Csg: Squeeze Casing Hole Size: TMD Set: Date Set: Csg Type: sa TMD: sa Date: Cmtd. Csg: Cementer: Jim Thompson Pipe Movement RPM: SPM: Init Torque: Stroke Length: Pipe Movement: (ft-Ibf) (ft) Avg Torque: (ft-Ibf) Drag Up: (Ibs) Stage No: 1 of 1 Start Mix Cmt: 03:38 Start Slurry Displ: 03:38 Start Displ: 03:50 End Pumping: 05:05 End G'ump Date: 6/19/2004 Top Plug: Y Botto"Tl Plug: Y Type: Non-Disp. LS Density: 9.8 (ppg) Visc: 40 (s/qt) Bottom Hole Circulating Temperature: (OF:, Displacement Fluid Type:Mud Slurry Data Fluid Type: FLUSH Slurry Interval: (ft) Water Source: lake Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: rF) Disp Avg Rate: Disp Max Rate: Bump Plug: Press Prior: Press Bumped: Press Held: Float Held: 7.00 (bbl/min) 7.00 (bbl/min) Y 900 (psi) 1 ,400 (psi) 1,400 (min) Y Page 1 of 3 Spud Date: 6/5/2004 Report Date: 6/19/2004 End: 7/2/2004 Plug Hole Size: Top Set: (ft) BTM set: (ft) Plug Date: Plug Type: Drilled Out: Cmtd. Csg: Max Torque: (ft-Ibf) Drag Down: (Ibs) Returns: 100 Total Mud Lost: (bbl) Cmt Vol to Surf: (bbl) Ann Flow After: N Mixing Method: Tub Density Meas By: Densometer PV/yP: 8 (cp)/16 (lb/100ft2) Gels 10 sec: 8 (lb/100ft2) Gels 10 min: 11 (lb/100ft2) Bottom Hole Static Temperature: (OF) Density: 9.8 (ppg) Volume: 516.00 (bbl) Mud Data Stage No: 1 Slurry No: 1 of 3 To: (ft) Description: CW100 Cmt Vol: 20.0 (bbl) Slurry Vol: (sk) Temperature: rF) Temped3ture: (OF) Temperature: rF) Density: 8.30 (ppg) Water Vol: (bbl) Class: Yield: (ft3/sk) Other Vol: 0 Time Compressive Strength 1: Compressive Strength 2: Purpose: Chemical was Mix Water: (gal) Foam Job: N Temp rF) (OF) Pressure (psi) (psi) Printed: 8/16/2005 7:03:47 AM ConocoPhilliþsA.laSka Ce'mentingllèiPQrt Legal Well Name: CD2-31 PB1 Common Well Name: CD2-31 PB1 Event Name: ROT - DRILLING Report #: Start: 3 6/5/2004 Stage No: 1 SlurryNo:2of3 Slurry Data Fluid Type: FLUSH Slurry Interval: (ft) To: (ft) Water Source: '-" Page 2 of 3 Spud Date: 6/5/2004 Report Date: 6/19/2004 End: 7 /2/2004 Description: MUDPUSH XL Class: Cmt Vol: 50.0 (bbl) Density: 10.50 (ppg) Yield: (ft3/sk) Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Purpose: SPACER Mix Water: (gal) Foam Job: N Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Temperature: CF) Temperature: (OF) Temperature: CF) Time Compressive Strength 1: Compressive Strength 2: Stage No: 1 SlurryNo:30f3 Slurry Data Fluid Type: TAIL Description: Slurry Interval: 13,598.00 (ffþ: 12, 126.00 (ft~mt Vol: 47.0 (bbl) Water Source: lake water Slurry Vol:230 (sk) Temp (OF) (OF) Pressure (psi) (psi) Class: G Density: 15.80 (ppg) Yield: 1.16 (ft3/sk) Water Vol: 27.8 (bbl) Other Vol: 0 Purpose: PRIMARY Mix Water: 5.09 (gal) Foam Job: N Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: CF) Temperature: (OF) Temper;~ture: CF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Stage No: 1 Slurry No: 30f 3-Additives Trade Name Type DISPERSANT retarder DEFOAMER Fluid loss Cooœn~~n Un~ 0.30 %BWOC 0.07 %BWOC 0.20 %BWOC 0.40 %BWOC 0-65 B-155 0-46 0-167 Temp (OF) CF) Pressure (psi) (psi) liquid Cone. Units Printed: 8/16/2005 7:03:47 AM ConocoPhillips Alaska Cementing Report Page 3 of 3 Legal Well Name: CD2-31 PB1 Common Well Name: CD2-31 PB1 Event Name: ROT - DRILLING Report #: S ta rt: 3 6/5/2004 Spud Date: 6/5/2004 Report Date: 6/19/2004 End: 7/2/2004 Casing Test Shoe Test Liner Top Test Test Press: (psi) For: (min) Cement Found between Shoe and Collar: Pressure: (ppge) Tool: Open Hole: (ft) r.rs Before Test: Liner Lap: Pos Test: (ppge) Neg Test: (ppge) Hrs Before Test: Cement Found on Tool: Tool: Tool: Log/Survey Evaluation Interpretation Summary CBL Run: Under Pressure: (psi) Bond Quality: Cet Run: Bond Quality: Temp Survey: Hrs Prior to Log: Cement Top: (ft) How Determined: TOC Sufficient: Job Rating: If Unsuccessful Detection Indicator: Remedial Cementing Required: Number of Remedial Squeezes: Remarks Pump 5 bbls CW100. Test lines to 3500 psi. Pump 15 bbls CW100, 50 bbls 12.5 mud push. Drop bottom plug and 47 bbls 15.8 cement. Drop top plug. Dowell pumped 20 bbls H20. Rig displaced with 497 bbls 9.8 mud. Bumped plug. Check floats OK. Test csg to 3500 psi. Printed: 8/16/2005 7:03:47 AM JOB NUMBER I EVENT CODE 124 HRS PROG TMD I TVD I DFS CD2-31 ODR 13,608.0 7,342.0 13.25 SUPERVISOR I RIG NAME & NO. I FIELD NAME I OCS NO. AUTH MD I DAILY TANG Donnie Lutrick / Larry HiI Doyon Drilling Inc 19 ALPINE 18,682.0 0 CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INTW/O MUD Rig down after cement job. 0 DATE OF LAST SAFETY MEETING DAILY TOTAL Run 7". Cement 7". Test BOP. 6/14/2004 87,503 I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE FINE SAND 16.38 10034643 LAST SURVEY: DATE TMD INC AZIM ¡LAST CASING ¡NEXT CASING 6/16/2004 13,533.65 80.320 318.950 9.625 (in) @ 3,302.0 (ft) 7.000 (in) @ 13,737.0 (ft) DENSITY(ppg) 9.80 I PP I ECD 19.80 I MUD DATAl DAILY COST 0 I CUM COST I FV PV/yP GELS WUHTHP FCIT.SOL OIL/WAT %Sand/MBT Ph/pM Pf/Mf CI Ca H2S 42 7/20 8/12 4.0/7.2 '1/ / 0.2/18.0 9.0/ 0.05/2 4 WELL NAME 24 HR FORECAST LITHOLOGY FROM 00:00 02:15 02:45 03:30 07:45 08:45 13:00 15:00 TO 02:15 02:45 03:30 07:45 08:45 13:00 15:00 00:00 HOURS 2.25 0.50 0.75 4.25 1.00 4.25 2.00 9.00 CODE CASE P CASE P CASE T CASE P CASE P CASE P CASE P CASE P TROUBLE SUB RUNC CIRC EQIP OTHR RUNC CIRC RUNC CIRC RUNC 24 HR SUMMARY: Ran casing from 250' to 13515'. COMPANY ConocoPhillips Company Fairweather E&P Service Doyon Drilling Inc Arctic Catering Inc. Dowell Halliburton - Sperry-Sun ITEM Fuel Water, Drilling RESERVOIR NAME CD2-36 UNITS gals bbls SERVICE USAGE 750 250 ~ Cono.coPhUlips Alaska,lnc. Daily Drilli ngReport Page 1 of 1 I REPT NO. I DATE 14 6/18/2004 ¡CUM. TANGO CUM INT ANG WI MUD o CUM COST WI MUD 2,379,807 AUTH. LAST BOP PRES TEST 6/14/2004 o LIME ES OPERATIONS SUMMARY PHASE INTRM1 INTRM1 INTRM1 INTRM1 INTRM1 I NTRM1 INTRM1 INTRM1 DESCRIPTION Rih wI 7" csg from 250' to 3261'. Circ 1 csg volume at 5 bpm at 310 psi. Change out Franks fill up tool. Cup was leaking. RIH w/ 7" csg from 3261' to 7590'. Circ and condition mud at 4 bpm at 430 psi. Upwt - 220 k. On wt - 120k. RIH w/ 7" csg from 7590' to 11,816'. Circ and condition mud at 4 bpm at 580 psi. Upwt - 325 k. On wt - 145 k. RIH w/ 7" csg from 11816' to 12,750'. From 12750' to 13515' casing was tight 460 K up and All of weight down to make a few feet at a time. Attempts to circulate tried to pack off. PERSONNEL DATA NO. HOURS COMPANY 1 Halliburton - Sperry-Sun 1 Halliburton - Sperry-Sun 27 M-I Drilling Fluids 5 Swaco 2 FMC Corporation Well he 2 SERVICE NO. HOURS 2 3 4 1 MATERIALS I CONSUMPTION ON HAND ITEM 9,075 Water, Potable 820 Fuel, Camp UNITS bbls gals USAGE 120 ON HAND 680 2,080 RESERVOIR AND INTERVAL. DATA ZONE TOP BASE 20 2 1470 Cd2-31 COMMENTS Printed: 8/16/2005 7:02:43 AM I JOB NUMBER I EVENT CODE 124 HRS PROG TMD I TVD I DFS CD2-31 ODR 13,608.0 7,342.0 14.25 SUPERVISOR I RIG NAME & NO. I FIELD NAME I OCS NO. AUTH MD I DAILY TANG Donnie Lutrick / Larry Hil Doyon Drilling Inc 19 ALPINE 18,682.0 0 CURRENT STATUS ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD Circulating prior to doing FIT. 0 24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL FIT. Change out mud system to MOBM and drill. 6/14/2004 449,583 LITHOLOGY I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE FINE SAND 16.38 10034643 LAST SURVEY: DATE TMD INC AZIM I LAST CASING 'NEXT CASING 6/16/2004 13,533.65 80.320 318.950 7.000 (in) @ 13,598.0 (ft) 4.500 (in) @ 18,682.0 (ft) DENSITY(ppg) 9.80 I PP I I ECD 19.80 I MUD DATAl DAILY COST 0 I CUM COST I FV PVIYP GELS WUHTHP FC/T.SOL OILlWAT %Sand/MBT Ph/pM Pf/Mf CI Ca 40 8/16 8/11 5.2/7.2 1/ / 0.2/15.0 9.0/ 0.05/2 4 WELL NAME ConocoPhillips Alaska, Inc. Daily Drilling Report BHA NO. I 4 BHA I HOLE CONDITIONS BHA WT. BELOW JARS STRING WT. UP STRING WT. DN STRING WT. ROT TORQUE / UNITS ITEM DESCRIPTION NO JTS LENGTH O.D. I.D. Bit 1 0.75 6.125 2.250 Motor 1 32.48 4.974 2.794 6" Stab 1 5.53 4.790 2.256 Sub - Float 1 2.40 4.625 2.250 MWD 1 8.56 4.720 2.625 MWD 1 24.47 4.750 1.250 MWD 1 10.86 4.700 1.250 MWD 1 11.01 4.630 2.815 NM Flex DC's 3 93.84 4.700 2.250 Crossover 1.16 4.770 2.625 3 X HWDP 3 91.95 3.500 2.060 Jar DNT 32.46 4.750 2.000 2 X HWDP 2 61.31 3.500 2.063 BIT / RUN 4/ 4 SIZE I MANUF. TYPE 6.125 HUGHES-CHR HC 306 BIT / RUN WOB FROM TO 00:00 00:30 HOURS 0.50 CODE CASE P TROUBLE SUB RUNC 00:30 01 :00 01:00 03:15 CASE P CEMENT P RURD CIRC 0.50 2.25 03:15 05:15 2.00 CEMENT P PUMP BITS SERIAL NO. 7102089RB JETS OR TFA 12/12/13/13/13/13 DEPTH IN DATE IN ·O-D-L-B-G-O·R 13,608.0 6/19/2004 1-1-CT -M-D-I-EC- TD Page 1 of 2 IREPT NO. ¡DATE 15 6/19/2004 ¡CUM. TANGO CUM INT ANG WI MUD o CUM COST WI MUD 2,829,390 AUTH. LAST BOP PRES TEST 6/19/2004 H2S o LIME ES BIT OPERATIONS RPM GPM PRESS I P BIT I HRS I 24Hr DIST 24Hr ROP CUM HRS I CUM DEPTH' CUM ROP OPERATIONS SUMMARY PHASE DESCRIPTION INTRM1 Ran 7" 26# L-80 BTCM casing from 13515' to 13561'. Made up hanger and landed casing @ 13598'. INTRM1 Rigged down fill up tool and made up cement head and lines. INTRM1 Broke circulation with 1 BPM and worked up in stages to 7 BPM as pressure and flow stabilized. Final circulating pressure 1000 PSI @ 7 BPM with full returns. Attempted to work pipe pulled up to 475 K. Pipe stuck. Seweight back on hanger. PJSM for cement job. INTRM1 Pump 5 bbls CW100. Test lines to 3500 psi. Pump 15 bbls CW100, 50 bbls 12.5 mud push. Drop bottom plug and 47 bbls 15.8 cement. Drop top plug. Dowell pumped 20 bbls H20. Rig displaced with 497 bbls 9.8 mud. Bumped plug with 1400 PSI. Check floats OK. CI P @ 0505Hrs. 6/19/04. BIT NO. I 4 BHA LENGTH 376.78 CONN SIZE CONN TYPE Printed: 8/16/2005 7:02:58 AM \~ '~ Page 2 of 2 CD2-31 ConocoPhilUps Alaska, Inc. Daily Drilling Repørt I JOB NUMBER I EVENOTDCRODE 124 HRS PROG I TMD I TVD 13,608.0 7,342.0 IDFS 14.25 I REPT NO. I DATE 15 6/19/2004 WELL NAME OPERATIONS SUMMARY FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION 05:15 06:00 0.75 CASE P MIT INTRM1 Rigged up and tested casing 3500 PSI for 30 miniutes. 06:00 06:45 0.75 CASE P RURD INTRM1 Rigged down cement and casing tools. 06:45 07:45 1.00 CASE P DEQT INTRM1 Laid down landing joint. Installed and tested packott. 07:45 08:45 1.00 WELCTL P EQRP INTRM1 Changed out rams from 7" to VBR. 08:45 13:00 4.25 WELCTL P BOPE INTRM1 Set test plug and Tested Annular to 250/3500 PSI. Tested rams,choke lines, kill lines, choke and kill valves and floor valves to 250/5000 PSI. Tested IBOP to 250/5000 PSI. State inspecter. AOGCC (Chuck Scheve) waived witnessing tests. Pull test plug and install wear bushing. 13:00 13:30 0.50 DRILL P RIRD I NTRM 1 Picked up bales and elevators. 13:30 17:30 4.00 DRILL P PULD INTRM1 Made up BHA and RIH. Shallow tested MWD. 17:30 20:30 3.00 DRILL P PULD INTRM1 Picked up and RIH 150 Jts. 4" DP from pipe shed. Broke circulation at 4000'. 20:30 00:00 3.50 DRILL P TRIP INTRM1 RIH to 12500'. Broke circulation @ 9000'. 24 HR SUMMARY: Ran and landed casing at 13598'. Circulated. Cemented casing. Tested casing to 3500 PSI. Rigged down tools and tested BOP. Made up and RIH with BHA and 150 Jts. DP from pipe shed. RIH with DP from derrick to 12500'. COMPANY ConocoPhillips Company Fairweather E&P Service Doyon Drilling Inc Arctic Catering Inc. Dowell Halliburton - Sperry-Sun Halliburton - Sperry-Sun SERVICE PERSONNELDATA NO. HOURS COMPANY 1 Halliburton - Sperry-Sun 1 M-I Drilling Fluids 27 Swaco 5 FMC Corporation Wellhe 2 ASRC Energy Services ( 2 Epoch Well Services Inc 2 SERVICE NO. HOURS 3 4 1 2 2 ITEM UNITS gals bbls USAGE 560 950 MATERIALS I CONSUMPTION ON HAND ITEM 8,515 Water, Potable 1,070 Fuel, Camp UNITS bbls gals USAGE 120 ON HAND 960 2,080 Fuel Water, Drilling RESERVOIR NAME CD2-36 CD2-31 RESERVOIR AND >INTERVALDA TA ZONE TOP BASE 1449 3.5 1420 392 4.3 1400 COMMENTS Cd2-31 CD2-31 Printed: 8/16/2005 7:02:58 AM ¡fell Name: trilling Supervisor: C02 -31 Rig: Lutrick / Hill PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Doyon 19 Date: 6/19/2004 Pump used: I Cement Unit I... Type of Test: Annulus Leak Off Test for Disposal Adequacy .. Pumping down annulus. lole Size: 8-1/2" I" Casing Shoe Depth I RKB-CHF: 34.81Ft 3,302 1Ft-MOl 2,3671 Ft-TVD Casina Size and Description: 19-5/8" 36#/Ft J-55 BTC Chanaes for Annular Adeauacy Test uter casing shoe test results in comments Jescription references outer casing string. ze is that drilled below outer casing. ¡mated TOC for Hole Depth. Enter inner casing OD at right Hole Depth 12,126IFt-MD I 6,828IFt-TVO 1"'1 Pressure IntearityTest Mud Weight: 9.8 ppg Inner casing 00: 7.0 In. Desired PIT EMW: Estimates for Test: 15.5 ppg 702 psi 0.8 bbls I.. I..l :MW = Leak-off Pressure + Mud Weight = 606 + 9 8 0.052 x TVD 0.052 x 2367 . EMW at 3302 Ft-MD (2367 Ft- TVD) = 14.7 w ~ ::) U) 500- U) W ~ Q. Comments: PIT 15 Second Shut-in Pressure, psi 460 1000 - o o 16 o 5 10 15 20 25 Shut-In time, Minutes o PIT Point 14 6 8 Barrels 10 12 2 4 ---CASING TEST ___LEAK-OFF TEST 9 5/8 LOT = 16.4 PPG EMW I Volume Input Pump Rate: 0.8 Bbl/min ... Barrels ~ Bbls/Strk ~ .. Casing Test Pressure Integrity Test Pumping Shut-in Pumping Shut-in Bbls psi Min psi Bbls psi Min psi 0.5 25 0 480 1 56 0.25 460 1.5 86 0.5 450 2 116 1 444 2.5 147 1.5 44.1 3 177 2 44 3.5 212 2.5 439 4 242 3 439 4.5 268 3.5 439 5 298 4 439 5.5 328 4.5 434 6 353 5 434 6.5 384 5.5 429 7 409 6 429 7.5 434 6.5 429 8 464 7 429 8.5 485 7.5 424 9 510 8 424 9.5 540 8.5 424 10 560 9 419 10.5 586 9.5 419 11 606 10 41r 11.5 555 12 520 12.5 515 13 515 13.5 525 14 530 14.5 535 Volume Volume Volume Volume Pumped Bled Back Pumped Bled Back 0.0 i:sbls li:sbls 14.5 i:sbls li:sbls 30 ',-. G. C. Alvord Alpine Drilling Team Leader "-'"' Drilling & Wells ConocóP'hillips P. O. Box 100360 Anchorage, AK 99510-0360 Phone: 907-265-6120 May 13, 2005 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 RE 0 MAY 1 7 ¿005 Alalka UII ~ '''' j.,,) ni7Ûuion Subject: Well Completion Report for CD2-21 (#204-245) Dear Commissioner: ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the recent drilling operations on the Alpine well CD2-21. If you have any questions regarding this matter, please contact me at 265-6120. Sincerely, Á- -c_ ()tJ( G. C. Alvord Alpine Drilling Team leader CPAI Drilling and Wells GCAlskad JGINAL ALASKA OIL AND ~~Tgg~~~:~ON cOMMfsslON MAY 1 7 2005 WELL COMPLETION OR RECOMPLETION REPOR11aAHnI1QG¡s, lJûmmis:dôfi 1b. Well Class: Am:horage Development 0 Exploratory 0 Service 0 Stratigraphic TesD 12. Permit to Drill Number: 1 a. Well Status: Oil [2] Gas U GINJ D WINJ D WDSPL D 2. Operator Name: ConocoPhillips Alaska, Inc. 3. Address: Plugged U Abandoned D 20AAC 25.105 Suspended D 20AAC 25.110 WAGD No. of Completions _ Other 5. Date Comp., Susp., or Aband.: February 7,2005 6. Date Spudded: December28,2004 ' 7. Date TD Reached: P. O. Box 100360, Anchorage, AK 99510-0360 4a. Location of Well (Governmental Section): Surface: 1775' FNL, 1538' FEL, Sec. 2, T11 N, R4E, UM At Top Productive Horizon: 5974582 5980157 5985547 ¿i February 3, 2005 ./ 8. KB Elevation (ft): 36.9' RKB 152.8' AMSL 9. Plug Back Depth (MD + NO): 19359' MD 17175' TVD 10. Total Depth (MD + TVD): ./ 19359' MD 1 7175' TVD ". Total Depth: 1638' FNL, 69' FWL, Sec. 34, T12N, R4E, UM 1580' FNL, 2801' FEL, Sec. 28, T12N, R4E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x-371703 y- TPI: x- 362840 y- Total Depth: x- 360057 ./ y- 18. Directional Survey: Yes 0 NoU 21. Logs Run: GRlRes, Dens/Neutron 22. CASING SIZE wr. PER FT. 16" 62.5# 9.625" 36# 7" 26# GRADE H-40 J-55 L-80 Zone-4 Zone-4 Zone-4 11. Depth where SSSV set: SSSV @ 2314' 19. Water Depth, if Offshore: N/A feet MSL CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD TOP BOTTOM TOP BOTTOM 36.9' 114' 36.9' 114' 36.9' 3085' 36.9' 2364' 36.9' 13382' 36.9' 7216' 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): open hole completion 26. Date First Production Submit core chips; if none, state "none". Form 10-407 Revised 12/2003 24. SIZE 4.5" 1 3.5" !r\ r.:: '" ~\/~D ./ 204-245 1 13. API Number: 50-103-20504-00 14. Well Name and Number: CD2-21 1 CD2-21 PB1 15. Field/Pool(s): Colville River Field Alpine Oil Pool 16. Property Designation: ADL 380075, 387212 17. Land Use Permit: ALK ASRCNPRA 02 20. Thickness of Permafrost: 1690' MD HOLE SIZE CEMENTING RECORD AMOUNT PULLED 42" Pre-Set 434 sx AS Lite, 239 sx Class G 215 sx Class G Abandonment plug # 1 @ 20095' - 19341' abandonment plug #2 @ 18851' to 17722' abandonment plug #3 @ 8712' to 8108' TUBING RECORD DEPTH SET (MD) 124' 112560' 12.25" 8.5" PACKER SET 12501' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED Plug #1 from 20095' to 19341' 63 bbls 15.8 ppg Class G Plug #2 from 18851' to 17722' 48 bbls 15.8 ppg Class G Plug #3 from 8712' to 8108' 53 bbls 17 ppg Class G PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Gas Lift Oil WATER-BBL o WA TER-BBL o NONE RBDMS 8FL MAY 1 9 2005 May 12, 2005 Date of Test Hours Tested Production for OIL-BBL GAS-MCF 5/12/2005 5 hours Test Period --> 631 327 Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF press. 876 psi 726 24-Hour Rate -> 2700 - 2001 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). CONT, I \, ~,Eq.. O"",N "R t, v, ERSE n f) , ~ j ,t u i f . t ,J ., ¡ , . " t... ,', \, L""f CHOKE SIZE 53% OIL GRAVITY - API (corr) not available GAS-OIL RATIO 741 tC '\.:)T 28. ",,-,," GEOLOGIC MARKERS 29. "-' FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". CD2-21 Seabee Form. Nanushak Gamma Ray Shale Kalubik Kuparuk Formation Miluveach Top Alpine 0 Top Alpine C Base Alpine C TO n/a 6021' 1 0261' 12645' 12646' 12980' 13164' 13290' 19245' 19359' 3836' 5903' 7069' 7069' 7161' 7198' 7211' 7183' 7175' N/A CD2-21PB1 TD 20171' 7786' 30. LIST OF ATTACHMENTS Summary of Daily Operations, Directional Survey 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Vern Johnson @ 265-6081 Printed Name.L\ C. Alvord Signature /r:J- -t. º' /f...... Title: Phone Alpine Drillina Team Leader 2'- .ç - ~ ( L 0 Date S--( ( (., ( (,)-ç- Prepared by Sharon Allsup-Drake INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: True vertical thickness. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1 and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other (explain). Item 27: If no cores taken, indicate "none". Item 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon 1 @ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 12/26/2004 20:00 - 00:00 4.00 MOVE DMOB MOVE 12/27/2004 00:00 - 18:00 18.00 MOVE MOVE MOVE 18:00 - 21 :00 3.00 WELCTL NUND RIGUP 21 :00 - 00:00 3.00 DRILL PULD SURFAC 12/28/2004 00:00 - 02:45 2.75 DRILL PULD SURFAC 02:45 - 03:15 0.50 DRILL PULD SURFAC 03:15 - 06:30 3.25 DRILL PULD SURFAC 06:30 - 07:00 0.50 DRILL OTHR SURFAC 07:00 - 12:00 5.00 DRILL DRLG SURFAC Rig down and begin rig move to CD2-21. Pipe shed off location @ 2230 Hrs. Moved rig to CD2-21 and rigged up. Rig accepted @ 1800 Hrs. Nippled up riser and loaded pipe shed while taking on spud mud. Picked up DP and stood back in derrick. Picked up and stood back 5" DP and HWDP. Picked up BHA componets. Picked up and made up BHA. Uploaded MWD and Pre spud meeting. Filled hole and tested mud lines to 3500 PSI. Spud well, Drill 12 1/4" hole from 114' to 613' MD 609' TVD ADT - 1.79 hrs. = ART - .7 hrs. AST - 1.09 hrs. WOB 10/20 k RPM 0/50 GPM 490 @ 990 psi String wt. 105K SO 105K Rot. 1 05K Torque on/off btm. - 6,000 /5,500 ftllbs. 12:00 - 00:00 12.00 DRILL DRLG SURFAC Drill 12 1/4" hole from 613' to 2216' MD 1922' TVD ADT - 5.53 hrs. = ART - 3.91 hrs. AST - 1.62 hrs. WOB 25/35 k RPM 0/65 GPM 600 @ 2050 psi String wt. 125K SO 118K Rot. 123K Torque on/off btm. -10,000/7,000 ftllbs. 12/29/2004 00:00 - 08:00 8.00 DRILL DRLG SURFAC Drill 12 1/4" hole from 2216' to 3095' MD 2368' TVD ADT - 5.38 hrs. = ART - 4.74 hrs. AST - .64 hrs. WOB 20/25 k RPM 0/50 GPM 600 @ 2250 psi String wt. 125K SO 115K Rot. 125K Torque on/off btm. - 9,000/6,000 ftllbs. 08:00 - 09:15 1.25 DRILL CIRC SURFAC Circulate hole clean. 09:15 -13:30 4.25 DRILL WIPR SURFAC POOH Backreaming w/50 RPM 600 GPM. 13:30 - 14:00 0.50 DRILL OBSV SURFAC Monitor well and blow down top drive. 14:00 - 15:15 1.25 DRILL WIPR SURFAC RIH to 3020'. 15:15 - 15:30 0.25 DRILL WIPR SURFAC Wash precautionary to 3095'. 15:30 - 16:30 1.00 DRILL CIRC SURFAC CBU X 2. 16:30 -19:30 3.00 DRILL TRIP SURFAC Blew down top drive and POOH to 135'. 19:30 - 21 :30 2.00 DRILL PULD SURFAC Set back DC's and laid down BHA. 21 :30 - 23:00 1.50 CASE RURD SURFAC Cleared floor and rigged up to run casing. 23:00 - 23:30 0.50 CASE SFTY SURFAC PJSM. 23:30 - 00:00 0.50 CASE RUNC SURFAC Ran 4 Jts 9 5/8" 36# J 55 BTC casing and checked floats. 12/30/2004 00:00 - 02:15 2.25 CASE RUNC SURFAC RIH w/9 5/8" 36# J-55 BTC csg from 131' to 1977'. 02:15 - 02:45 0.50 CASE CIRC SURFAC Circ 1 csg volume. Stage pumps up to 5 bpm at 320 psi. Up wt 130k. Dn wt 115k. 02:45 - 04:00 1.25 CASE RUNC SURFAC RIH w/9 5/8" csg from 1977' to 3048'. MU hanger. Land csg at 3085'. Up wt 160k. Dn wt 120k. 04:00 - 04:30 0.50 CASE RURD SURFAC RD Franks fill up tool. MU cement head. RU lines. 04:30 - 06:30 2.00 CEMENTCIRC SURFAC Circ and condition mud. Stage pumps up to 6.5 bpm at 290 psi. 06:30 - 06:45 0.25 CEMENT SFTY SURFAC PJSM on cementing csg with all personnel. 06:45 - 08:30 I 1.75 CEMENT PUMP SURFAC Rig pumped 40 bbls biozzan/ nutplug spacer. Dowell tested lines to I 2500 psi. Dropped bottom plug. Dowell pumped 50 bbls 10.5 ppg I mudpush, 343 bbls 10.7 ppg lead cement and 50 bbls 15.8 ppg tail cement. 08:30 - 09:00 0.50 CEMENT DISP SURFAC Dropped top plug. Dowell pumped 20 bbls H20. Rig pumped 212 bbls mud. Bumped plug. Floats OK. 140 Bbls. cement to surface. CIP @ 0852 Hrs. Printed: 2/14/2005 9:39:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 12/30/2004 09:00 - 09:45 0.75 CASE DEQT SURFAC 09:45 - 10:45 1.00 CASE RURD SURFAC 10:45 - 13:30 2.75 CASE NUND SURFAC 13:30 - 16:00 2.50 CASE NUND SURFAC 16:00 - 20:30 4.50 WELCTL BOPE SURFAC 12/31/2004 20:30 - 22:00 22:00 - 23:00 23:00 - 23:30 23:30 - 00:00 00:00 - 01 :00 01:00 - 02:15 02:15 - 02:30 02:30 - 03:45 03:45 - 04:30 04:30 - 15:00 115:00 - 16:00 116:00 - 00:00 00:00 - 01 :30 01 :30 - 02:00 02:00 - 02:30 02:30 - 06:15 06: 15 - 08:45 08:45 -10:15 10:15 -13:15 13:15 -13:30 13:30 - 14:00 14:00 - 15:00 15:00 - 15:30 15:30 - 00:00 1/1/2005 1/2/2005 00:00 - 07:00 1.50 FISH PULD 1.00 DRILL PULD 0.50 RIGMNT RSRV 0.50 DRILL PULD 1.00 DRILL PULD 1.25 FISH FISH 0.25 FISH CIRC 1.25 DRILL TRIP 0.75 FISH PULD 10.50 DRILL PULD 1.00 DRILL OTHR 8.00 DRILL PULD 1.50 DRILL PULD 0.50 DRILL RIRD 0.50 DRILL PULD 3.75 DRILL PULD 2.50 DRILL PULD 1.50 RIGMNT RSRV 3.00 CEMENTDSHO 0.25 DRILL DRLG 0.50 DRILL CIRC 1.00 CEMENT FIT 0.50 DRILL CIRC 8.50 DRILL DRLG SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC INTRM1 I NTRM1 7.00 DRILL DRLG INTRM1 07:00 - 08:00 1.00 DRILL CIRC INTRM1 08:00 - 09:30 1.50 DRILL TRIP INTRM1 09:30 - 10:00 0.50 DRILL CIRC INTRM1 10:00 - 10:30 0.50 DRILL TRIP INTRM1 10:30 - 12:30 2.00 DRILL CIRC INTRM 1 12:30 - 14:30 2.00 DRILL TRIP INTRM 1 14:30 - 15:30 1.00 DRILL TRIP INTRM 1 15:30 - 16:30 1.00 DRILL CIRC INTRM 1 16:30 - 00:00 7.50 DRILL DRLG I NTRM1 Test csg to 2500 psi for 30 min. RD csg equip, landing jt and long bails. Nipple down riser. Changed swivel packing and nippled up BOP. Test BOPE - Hydril to 250 & 3500 psi - Pipe rams, choke & kill line valves, choke manifold valves, IBOP and floor valves to 250 & 5000 psi - performed accumutator closure test. Witiness of test by AOGCC waived by John Crisp. Pulled test plug and set wear bushing. Picked up and diagramed fishing basket. Picked up DP from pipe shed and RIH. Serviced rig and top drive. Continued picking up 5" DP. Continued picking up 5" DP from pipe shed. Washed over pipe wrench with reverse basket. CBU. POOH and stood back 5" DP. Lay down Fishing tools and recovered fish. Continiued picking up and standing back 5" DP from pipe shed. Rearranged HWDP in derrick. Continiued picking up and standing back 5" DP from pipe shed. Picked up 5" DP from pipe shed and stood in derrick. Installed Geo Span unit. Picked up BHA componets. Made up BHA. Up loaded MWD. Installed nukes and RIH with HWDP. RIH picking up 5" DP from pipe shed to 2845'. Slipped and cut drilling line. Serviced rig. Drilled out shoe track and cleaned out rat hole to 3095'. Drilled from 3095' to 3115'. ADT. 25 Hrs. CBU. Rigged up and performed FIT to 17.5 PPG EMW. Changed mud to flo pro. Drill 8 1/8" hole from 3115' to 4082' MD 2871' TVD ADT - 5.8 hrs. WOB 5/15 k RPM 100/160 GPM 625 @ 2240 psi String wt. 155K SO 11 OK Rot. 125K Torque on/off btm. - 12,500/11,500 ftllbs. ECD 11.2 to 11.5 Drill 8 1/8" hole from 4082' to 4739' MD 3202' TVD ADT - 4.3 hrs. WOB 8/15 k RPM 110/160 GPM 625 @ 2280 psi String wt. 165K SO 11 OK Rot. 138K Torque on/off btm. - 14,000/13,000 ftllbs. ECD 11.2 to 11.8 Note: Hole packed off while drilling @ 4300' and lost 75 Bbls mud. Circulated hole clean. POOH with pump due to incorrect hole fill. Observed gas at surface. Circulated 'gas cleared up. RIH to 4653'. Washed down (precautionary) to 4739' and raised MW to 9.8 PPG. POOH on TT to 2440' and laid down top ghost reamer. RIH to 4648'. Washed down (precautionary) to 4739' and CBU. Observed gas at bottoms up. Drill 8 1/8" hole from 4739' to 5408' MD 3530' TVD ADT - 5 hrs. WOB 10/15 k RPM 120/150 GPM 600 @ 2080 psi String Printed: 2/14/2005 9:39:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 1/2/2005 16:30 - 00:00 1/3/2005 00:00 - 12:00 12:00 - 13:30 13:30 - 14:30 14:30 -19:00 7.50 DRILL DRLG INTRM1 wt. 180K SO 118K Rot. 140K Torque on/off btm. - 14,000/12,500 ftllbs. ECD 11.2 to 11.6 12.00 DRILL DRLG INTRM1 Drill 8 1/8" hole from 5408' to 6361' MD 4006' TVD ADT - 7.53 hrs. WOB 10/15 k RPM 110/150 GPM 625 @ 2420 psi String wt. 195K SO 125K Rot. 150K Torque on/off btm. - 14,000/13,500 ftllbs. ECD 11.2 to 11.6 1.50 DRILL DRLG INTRM1 Drill 8 1/8" hole from 4082' to 4739' MD 3202' TVD ADT -1.0 hrs. WOB 10/120 k RPM 150/160 GPM 625 @ 2380 psi String wt. 195K SO 125K Rot. 150K Torque on/off btm. - 14,000/13,500 ftllbs. ECD 11.2 to 11.8 Note: Hole packed off while drilling @ 6551' and lost 30 Bbls mud. 1.00 DRILL OBSV INTRM1 Exhale test. 4.50 DRILL DRLG INTRM1 Drill 8 1/8" hole from 6551' to 7027' MD 4381' TVD ADT - 3.17 hrs. WOB 15/20 k RPM 160 GPM 625 @ 2380 psi String wt. 195K SO 125K Rot. 155K Torque on/off btm. - 14,000/13,500 ftllbs. ECD 11.2 to 11.6 Circulated and raised MW to 9.8 PPG. Geo pilot not responding. POOH to 6170' with pump @ 5 BPM due to tight spots. Back reamed through 2 spots with little problem. POOH on TT to 5122'. POH f/5122' to 3039'. Check flow. OK. POH to HWDP at 736'. Check flow. OK. Std back HWDP and jars. Std back DC's. Remove sources. Std back MWD. LD Geopilot and bit. 19:00 - 20:00 1.00 DRILL CIRC INTRM1 20:00 - 22:00 2.00 DRILL TRIP INTRM1 22:00 - 00:00 2.00 DRILL TRIP INTRM1 1/4/2005 00:00 - 03:15 3.25 DRILL TRIP INTRM1 03:15 - 06:15 3.00 DRILL PULD INTRM1 Geopilot housing above clutch assembly was bent in on one side. No junk damage to housing. MU BHA #3. Install sources. Upload MWD. RIH w/ DC's and HWDP tp 739'. Shallow test MWD. Downlink to geopilot. RIH f/ 739' to 6935' Break circulation - wash down f/6935' to 7027' - Circulate btms up @ 515 gpm @ 2000 psi w/90 rpm - No gas on btms up Drill 8 1/2" hole w/ Geo Pilot f/7027' to 7981' MD 4792' TVD ADT - 6 hrs. WOB 15/20 k RPM 120 GPM 605 @ 2400 psi String wt. PU 230 SO 130 Rot 160 Torque on/off btm. - 16,000/15,000 ft. Ibs. ECD - 10.9 to 11.3 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole w/ Geo Pilot f/7981' to 9124' MD 5268' TVD ADT - 7.90 hrs. WOB 18/22 k RPM 120/165 GPM 625 @ 2400 psi String wt. PU 215 SO 144 Rot 170 Torque on/off btm. - 16,000/15,500 ft. Ibs. ECD - 11.1 to 11.5 8.00 DRILL DRLG INTRM1 Drill 8 1/2" hole f/9124' to 10,075' MD 5470' TVD ADT - 5.5 hrs. WOB 15/21 k RPM 135 GPM 625 @ 2300 psi String wt. PU 205 SO 145 ROT 170 Torque on/off btm. - 15,500/15,000 ft.llbs ECD - 11.0 to 11.4 06:15 - 10:00 3.75 DRILL PULD INTRM1 10:00 - 14:00 4.00 DRILL TRIP INTRM1 14:00 - 14:30 0.50 DRILL REAM INTRM1 14:30 - 00:00 9.50 DRILL DRLG INTRM1 1/5/2005 00:00 - 12:00 I 112:00 - 20:00 Printed: 2/14/2005 9:39:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 1/5/2005 20:00 - 21 :00 1.00 DRILL CIRC INTRM1 Pump hi-vis sweep & circulate hole clean for wiper trip 625 gpm @ 2080 psi w/150 rpm - Flow check (static) 21 :00 - 22:30 1.50 DRILL WIPR INTRM1 Wiper trip f/1 0,075' to 9600' - pulled on IT - worked through various tight spots pulling 35 to 45 over - hole took proper fill 22:30 - 00:00 1.50 DRILL WIPR INTRM1 Wiper trip f/ 9600' to 9028' w/ pump 550 gpm @ 1600 psi w/1 00 rpm 1/6/2005 00:00 - 02:00 2.00 DRILL WIPR INTRM1 POH w/ pump from 9028' to 8647' at 550 gpm - 1600 psi -100 rpms. Check flow. OK. Cant' POH on trip tank to 6935'. Check flow. OK. No hole problems. 02:00 - 04:00 2.00 DRILL WIPR INTRM1 RIH to 9981'. No hole problems. 04:00 - 05:00 1.00 DRILL CIRC INTRM1 Break circ. Precautionary wash and ream from 9981' to 10,072'. CBU. No gas at bottoms up. 05:00 - 12:00 7.00 DRILL DRLG INTRM1 Drill 8 1/2" hole w/ GeoPilot f/10,075' to 10,838' MD 5636' TVD ADT - 4.3 hrs. WOB 15/21 k RPM 120/160 GPM 625 @ 2520 psi String wt. PU 250 SO 135 ROT 175 Torque on/off btm. - 19,000/18,500 ft.llbs ECD - 11.1 to 11.5 12:00 - 00:00 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole w/GeoPilot f/1 0,838' to 11,978' MD 5884' TVD ADT - 7.2 hrs. WOB 16/21 k RPM 155 GPM 265 @ 2520 psi String wt. PU 210 SO 153 Rot 180 Torque on/off btm. - 14,500/13,000 ftllbs. ECD - 11.0 to 11.2 1/7/2005 00:00 - 06:00 6.00 DRILL DRLG INTRM1 Drill 8 1/2" hole w/GeoPilot f/11 ,978 ' to 12,638' MD 6021' TVD ADT - 4.60 hrs. WOB 16/21 k RPM 155 GPM 625 @ 2220 psi String wt. PU 215 SO 150 Rot 185 Torque on/off btm. - 16,000/14,000 ftllbs. ECD - 11.0 to 11.3 06:00 - 06:45 0.75 DRILL CIRC INTRM1 Circ while changing swab in #1 mud pump. 370 gpm - 1050 psi - 110 rpms. 06:45 - 12:00 5.25 DRILL DRLG INTRM1 Drill 8 1/2" hole w/GeoPilot f/12,638 ' to 13,120' MD 6124' TVD ADT - 3.0 hrs. WOB 9/14 k RPM 160 GPM 625 @ 2600 psi String wt. PU 230 SO 150 Rot 185 Torque on/off btm. - 18,000/16,500 ftllbs. ECD - 11.1 to 11.5 12:00 - 00:00 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole w/ GeoPilot f/13,120' to 14,478' MD 6389' TVD ADT - 7.6 hrs. WOB -16/21 k RPM - 160 GPM 625 @ 2600 psi String wt. PU 245 SO 150 Rot 190 Torque on/off btm. - 18,500/18,000 ft.llbs. ECD - 11.0 to 11.4 1/8/2005 00:00 - 12:00 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole w/ GeoPilot f/14,478' to 15,440' MD 6618' TVD I ADT - 7.5 hrs. WOB - 12/20 k RPM - 160 GPM 625 @ 2740 psi String wt. PU 250 SO 150 Rot 190 Torque on/off btm. - 19,500/19,000 ft.llbs. ECD - 11.0 to 11.1 12:00 - 18:00 6.00 I DRILL DRLG INTRM 1 Drill 8 1/2" hole w/ GeoPilot f/15,440' to 15,977' MD 6732' TVD ADT - 4.1 hrs. WOB - 12/16 k RPM - 160 GPM 625 @ 2830 psi Printed: 2/14/2005 9:39:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon 1 @ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 1/8/2005 12:00 - 18:00 6.00 DRILL DRLG INTRM1 Streing wt. PU 252 SO 150 Rot 192 Torque on/off btm. - 20,000/18,000 ft.llbs. ECD - 11.0 - 11.2 18:00 - 00:00 6.00 DRILL CIRC INTRM1 Pump hi vis sweep - circulate 3X btms up (std. back 1 std DP/30 mins.) 625 gpm @ 2700 psi w/150 rpm f/15,977' to 15,024' * Note Phase 3 weather conditons 1/9/2005 00:00 - 05:30 5.50 DRILL WIPR INTRM1 POH on trip tank from 15,024' to 8,361'. Worked through tight spots at 8900' and 8500'. No problems. 05:30 - 06:00 0.50 DRILL WIPR INTRM 1 Monitor well. Pump dry-job. 06:00 - 12:00 6.00 DRILL WIPR INTRM1 POH from 8400' to 3026'. Worked through tight spots at 7850' and 5920'. No problems. Rotate through tight spots at 4884' and 4114'. Appears to be minor ledges. 12:00 - 14:00 2.00 RIGMNT RSRV INTRM1 PJSM. Slip and cut drilling line. Service TD 14:00 - 16:00 2.00 DRILL TRIP I NTRM1 Continue to POOH f/ 3026' to 735' (HWDP) flow check - OK (Note: Due to Phase III conditions - Decision was made to POOH & Test BOPE) 16:00 - 22:00 6.00 DRILL OTHR INTRM1 Std back HWP & Jars - Remove RA sources f/ MWD - Down load MWD Thaw out link tilt on TD - Service Geo-Pilot - Change out battery in MWD Change out pulser for MWD - Std back MWD, GeoPilot & bit Pull wear bushing - Set test plug PJSM on testing BOPE - RU to test BOPE - RU a trap to heat TD while testing BOPE Test BOPE to 250-5000 psi with annular to 3500 psi. Pull test plug and install wear bushing. Witness of test waived by AOGCC rep John Spalding. Thaw rig floor and link tilt. Service rig. PJSM on BHA and RA sources. Thaw out MWD tools. Install sources. Upload MWD. RIH w/ BHA to 809'. Shallow test MWD. RIH f/809' to 3032' (9 5/8" csg shoe) Break circulation - circulate & condition mud 400 gpm @ 800 psi Wait on equipment( vac trucks, injection skid, & fuel tanker) to be thawed out, repaired and put back in service Circulate & condition mud 400 gpm @ 800 psi Wait on equipment( vac trucks, injection skid, & fuel tanker) to be thawed out, repaired and put back in service RIH w/5" DP from 3032' to 7020'. Circ and condition mud. Monitor well. Gas breaking out at surface. Circ additional bottoms up. Monitor well. Static. RIH w/5" DP from 7020' to 11,028' Circulate & condition mud 530 gpm @ 1800 psi w/ 20 rpm Continue RIH f/11 ,028' to 14,890' - hole becoming tight - 25 to 40 drag going down Establish circulation - wash & ream f/14,890' to 15,024' - 338 gpm @ 1300 psi w/120 rpm Continue RIH f/15,024' to 15,881' Establish circulation - Wash & ream f/15,881' to 15,977' - 310 gpm @ 1320 psi w/120 rpm Stirng wt. PU 270 SO 150 Rot 195 Torque off btm 21,000 ftllbs 0.50 DRILL CIRC INTRM1 Circulate btms up 625 gpm @2800 psi w/160 rpm 22:00 - 22:30 0.50 DRILL OTHR INTRM1 22:30 - 00:00 1.50 WELCTL BOPE INTRM1 1/10/2005 00:00 - 05:30 5.50 WELCTL BOPE INTRM1 05:30 - 07:00 1.50 DRILL OTHR INTRM 1 07:00 - 12:00 5.00 DRILL OTHR INTRM 1 12:00 - 13:30 1.50 DRILL TRIP INTRM1 13:30 - 00:00 10.50 WAlTON EQIP INTRM1 1/11/2005 00:00 - 04:30 4.50 WAlTON WOW INTRM1 04:30 - 07:30 3.00 DRILL TRIP INTRM1 07:30 - 09:30 2.00 DRILL CIRC INTRM1 09:30 - 13:00 3.50 DRILL TRIP INTRM1 13:00 - 15:00 2.00 DRILL CIRC INTRM1 15:00 - 17:30 2.50 DRILL TRIP INTRM1 17:30 - 21 :00 3.50 DRILL REAM INTRM1 21 :00 - 22:30 1.50 DRILL TRIP INTRM1 22:30 - 00:00 1.50 DRILL REAM INTRM1 1/12/2005 00:00 - 00:30 Printed: 2/14/2005 9:39:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon 1 @ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 1/12/2005 00:30 - 12:00 11.50 DRILL DRLG INTRM1 Drill 8 1/2" hole w/ GeoPilot f/ 15,977' to 16,806' MD 6909' TVD I ADT - 7.1 hrs. I I WOB 10/20 k RPM 160 GPM 615 to 625 @ 2800 to 2900 psi String wt. PU 255 SO 155 Rot 195 Torque on/off btm. - 21,500/21,000 ft Ibs. ECD - 11.0 to 11.2 12:00 - 00:00 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole w/ GeoPilot f/ 16,806' to 17,757' MD 7112' TVD ADT - 8.2 hrs. WOB 11/15 k RPM 155 GPM 600 @ 2990 String wt. PU 270 SO 150 Rot 197 Torque on/off btm. - 22,000/ 21,000 ft. Ibs. ECD - 11.1 to 11.3 1/13/2005 00:00 - 03:15 3.25 DRILL DRLG INTRM1 Drill 8 1/2" hole w/ GeoPilot f/ 17,757' to 17,963' MD 7159' TVD WOB 10/15 k RPM 155 GPM 600 @ 2950 psi String wt. PU 280 SO 150 Rot 197 Torque on/off btm. - 23,000/22,000 ft Ibs. ECD - 11.3 ppg 03:15 - 05:15 2.00 RIGMNT RSRV I NTRM1 Wash pipe packing on Top Drive leaking - set back one stand - change out Wash pipe and packing. Circ hole with head pin on drill pipe 550 gpm /2800 psi. Precautionary ream from 17,850' to 17,963' 05:15 - 05:30 0.25 DRILL DRLG INTRM1 Drill from 17,963' to 17,977' 05:30 - 06:00 0.50 RIGMNT RSRV INTRM1 Circ hole 420 gpm / 1200 psi Change out swab on #2 mud pump 06:00 - 10:45 4.75 DRILL DRLG INTRM1 Drill 8 1/2" hole w/ GeoPilot f/ 17,977' to 18,267' MD 7225' TVD ADT since midnight - 5.4 hrs. WOB 10/15 k RPM 155 GPM 600 @ 2900 to 2960 psi String wt. PU 250 SO 150 Rot 200 Torque on/off btm. - 23,000/22,000 ft Ibs. ECD - 11.3 to 11.0 ppg 10:45 - 11 :30 0.75 RIGMNT RSRV INTRM1 Circ hole 420 gpm / 1250 psi Change out swab on #1 mud pump 11 :30 - 00:00 12.50 DRILL DRLG INTRM1 Drill 8 1/2" hole w/ GeoPilot f/ 18,267' to 19,149' MD 7441' TVD ADT 7.3 hrs. WOB 13/20 k RPM 150 GPM 600 @ 3180 psi String wt. PU 285 SO 150 Rot 208 1Þ Torque on/off btm. - 23,500/22,000 ft Ibs. r ECD - 11.0 to 11.1 1/14/2005 00:00 - 13:00 13.00 DRILL DRLG INTRM1 Drill 8 1/2" hole w/ GeoPilot f/ 19,149' to 20,171' MD 7786' TVD ADT 7.6 hrs. WOB 15/20 k RPM 150 GPM 600 @ 3170 psi '1'cÞ String wt. PU 300 SO 155 Rot 210 ,,!t . ~ Torque on/off btm. - 24,500/22,000 ft Ibs. ECD - 11.0 to 11.1 13:00 - 19:30 6.50 DRILL CIRC INTRM1 Circulate and conditiom mud - 600 gpm / 3060 psi / 150 rpm Circ 3 x BU - set back one stand every 30-40 minutes from 20171' to 19,241' 19:30 - 00:00 4.50 DRILL TRIP INTRM1 POOH - backreaming & pumping f/ 19,241' to 18,501' -120 rpm 400 gpm @ 2230 psi String wt. PU 310 SO 150 Rot 215 Torque 21,000 ft. Ibs. 1/15/2005 00:00 - 05:30 5.50 DRILL TRIP INTRM1 POOH - backream from 18,501' to 18,220' - 120 rpm 400 gpm @ 2230 psi Printed: 2/14/2005 9:39:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon1@ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 1/15/2005 00:00 - 05:30 5.50 DRILL TRIP INTRM1 Pump out from 18,220' to 16,735' - 500 gpm I 2200 psi Backream from 16,735' to 16,452' - 500 gpm I 2200 psi /110 rpm String wt. PU 280 SO 150 Rot 210 Torque 20,000 ft. Ibs. 105:30 - 06:15 0.75 DRILL OBSV INTRM1 Monitor well before pulling on trip tank - flow check, ok. 06:15 -11:00 4.75 DRILL TRIP I NTRM 1 POOH - from 16,452' to 12,930' - monitor well on trip tank - Work through several tight spots from 14,655' to 13,010' 30-40K over. 11 :00 - 11 :30 0.50 DRILL OTHR INTRM1 Pipe pulled tight out of slips with bit @ 12,930'. Picked up single- established circulation and worked pipe free with torque and slump. 11 :30 - 14:00 2.50 DRILL CIRC INTRM1 Pumped 40 bbl high vis sweep - Backream from 12,930' to 12644' 600 gpm /2760 psi /130 rpm Circ 2 x BU. 14:00 - 16:00 2.00 DRILL TRIP INTRM 1 Pipe continued to pull tight out of slips - POOH backream from 12,644' to 12,264' - 570 gpm /2340 psi /120 rpm 16:00 - 19:30 3.50 DRILL TRIP INTRM1 Monitor well, ok. Attempted to POOH from 12264', made several attempts to pass 12,198' with 60 k over, unable. Backream from 12,264' to 11,883' - 550 gpm w/120 rpm 19:30 - 22:00 2.50 DRILL TRIP INTRM1 POOH on TT f/11 ,883' to 11,313' - Tight hole @ 11,255' - Attempt to work pipe through tight hole @ 11,255' - pulling 75 k over -Drop back down to 11,313' - Back ream f/11,313' to 11,122' - 550 gpm wI 120 rpm 22:00 - 00:00 2.00 DRILL TRIP INTRM1 Monitor well before pulling on TT - flow check.OK POOH on TT f/11, 122' to 10,742' 1/16/2005 00:00 - 00:30 0.50 DRILL TRIP INTRM1 POOH on trip tank from 10,742' to 10,457', attempted to work pipe through tight spot 10,428', unable. 00:30 - 02:45 2.25 DRILL TRIP INTRM1 Backream from 10,457' to 10,171' - 500 gpm /1730 psi /120 rpm Monitor well, ok. 02:45 - 06:00 3.25 DRILL TRIP INTRM 1 POOH on trip tank from 10,171' to 7981' - attempted to wipe hole on last stand pulled, unable to go back down below 8000'. 06:00 - 07:30 1.50 DRILL TRIP I NTRM1 Slight effort to wash down past 8000' - Back ream from 8076' to 7886' - 540 gpm /1800 psi /120 rpm Rot up wt 165K w/11 ,000 ftllbs torque Circ 1.5 X BU - moderate amount of fine cuttings back. Monitor well, ok. 07:30 - 15:00 I 7.50 DRILL TRIP INTRM1 POOH on trip tank from 7886' to 3032'. - wiped tight spot @ 5935' - flow check well @ shoe - static. Continue to POOH - stand back hwdp. 15:00-15:15 0.25 DRILL SFTY INTRM1 PJSM - pulling RA sources 15:15-17:30 2.25 DRILL PULD INTRM1 Pull RA sources f/ MWD - Down load MWD - Service Geopliot - LD MWD & GeoPilot 17:30 - 19:30 2.00 DRILL OTHR INTRM1 Clean up rig floor - Chaange grabs & saver sub in TO 19:30 - 00:00 4.50 DRILL PULD INTRM1 Pre job on running tbg. - MU mule shoe - PU & run 36 jts. 3 1/2" 12.6 # Eue tbg for cmt stinger - MU XO's for DP - RIH wI 5" DP TO 3034' 1/17/2005 00:00 - 02:30 2.50 ABANDJ\ TRIP INTRM1 Slip and cut drilling line - Service Top Drive and Drawworks Attempted to determine actual bbllstroke pump output using calibrated trip tank. 02:30 - 06:30 4.00 ABANDJ\ TRIP INTRM1 RIH with 3 1/2" tubing tail below 5" drill pipe to 7000', drill pipe began flowing back. 06:30 - 07:00 0.50 ABANDJ\ CIRC INTRM1 Circ hole and spot slug in pipe. 07:00 - 12:15 5.25 ABANDJ\ TRIP INTRM1 Continue to RIH from 7,000' to 14,548' monitoring displacement on pit #6. 12:15 - 14:00 1.75 ABANDJ\ CIRC I NTRM 1 Circ and condition mud - 500 gpm I fcp 1260 psi PUW 220k SOW 155K 14:00 - 21 :00 7.00 ABANDJ\ TRIP INTRM1 Continue to RIH from 14548' to 20,095' - Worked through several tight spots w/ pump 17,768',18,324',19,253',19,438' - unable to work or circulate past 20,095' Printed: 2/14/2005 9:39:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 1/17/2005 21 :00 - 23:00 2.00 ABAND" CIRC INTRM1 Break circulation - Circulate btms up + @ 420 gpm @ 1300 psi - working pipe - PU wt. 290 SO wt. 155 23:00 - 00:00 1.00 ABAND" TRIP INTRM1 Wiper trip f/20,095' to 19,,623' - pulled out OK 1/18/2005 00:00 - 00:30 0.50 ABAND" TRIP INTRM1 RIH to 20,095' with tubing tail. 00:30 - 02:00 1.50 ABAND" CIRC INTRM1 CBU @ 450 GPM 1270 PSI. 02:00 - 03:00 1.00 CEMENT PLUG INTRM 1 Set balanced plug from 20,095' to 19,341'. Mixed and pumped 63 Bbls CI G @ 15.8 PPG. 20 Bbls water ahead + 3 behind. Displaced with 324 Bbls. mud @ 10 BPM. 03:00 - 05:00 2.00 ABAND" TRIP INTRM1 POOH to 18,850'. 05:00 - 06:00 1.00 ABAND" CIRC INTRM1 Pumped 40 bbls of high vis (gel) pill - displaced to equalization 06:00 - 06:30 0.50 ABAND" TRIP INTRM1 POOH to 18,478'. 06:30 - 08:00 1.50 ABAND" CIRC INTRM1 Circulated and conditioned mud 500 GPM 1620 PSI. 08:00 - 09:00 1.00 CEMENT PLUG INTRM1 Set balanced plug from 18,478' to 17,722'. Mixed and pumped 48 Bbls CI G @ 15.8 PPG. 20 Bbls water ahead + 3 behind. Displaced with 299 Bbls. mud @ 10 BPM. 09:00 - 10:00 1.00 ABAND" TRIP INTRM1 POOH to 17,272'. 10:00 - 10:30 0.50 ABAND" CIRC INTRM1 Circulated 40 Bbls of mud to clear tubing 10:30 - 16:00 5.50 ABAND" TRIP INTRM1 POOH to 9093' - pumped 40 bbls of high vis (gel) pill - displaced to equalization 16:00 -16:15 0.25 ABAND" TRIP INTRM 1 POOH to 8712'. 16:15 -17:00 0.75 CEMENT PLUG INTRM 1 Set balanced plug from 8,712' to 8,108'. Mixed and pumped 53 Bbls CI /' G @ 17 PPG. 25 Bbls water ahead + 3 behind. Displaced with 129 Bbls. mud @ 12 BPM. 17:00 - 17:30 0.50 CEMENT TRIP INTRM1 POOH to 8108'. 17:30 - 19:30 2.00 CEMENT CIRC INTRM1 CBU 500 GPM 740 PSI. 19:30 - 20:00 0.50 CEMENT TRIP INTRM1 POOH to 7,629' and observed well. Pumped dry job. / 20:00 - 00:00 4.00 CEMENT TRIP INTRM1 POOH laying down DP to 3,080'. 1/19/2005 00:00 - 01 :30 1.50 DRILL TRIP I NTRM1 Lay down excess 5" drill pipe 01 :30 - 01 :45 0.25 DRILL SFTY INTRM1 PJSM on laying down tubing 01 :45 - 06:00 4.25 DRILL PULD INTRM1 RU Tubing tongs and elevators - POOH lay down 36 joints of 3 1/2" tubing. Stripped contaminated cement and mud of tubing - clean up rig floor and drip pans. 06:00 - 08:30 2.50 DRILL PULD INTRM2 MU BHA #5 - Bit - GeoPilot - GP Fex - stab - GRlPWD - stab - HCIM - TM-fs 08:30 - 09:30 1.00 DRILL TRIP INTRM2 RIH with flex collars and hwdp - pu new jars - test surface lines to 3500 psi - shallow test tools. 09:30 - 10:00 0.50 RIGMNT RSRV INTRM2 Service Top Drive 10:00 - 12:00 2.00 DRILL TRIP INTRM2 RI H to 2723' 12:00 - 13:00 1.00 RIGMNT RSRV INTRM2 Slipped and cut drilling line. 13:00 - 14:15 1.25 DRILL TRIP INTRM2 RIH to 7500'. Taking weight. 14:15 - 14:45 0.50 DRILL REAM INTRM2 Washed and reamed through tight spot from 7500' to 7571 '. 14:45 - 17:45 3.00 DRILL TRIP INTRM2 RIH to 8429'. 7$/ 17:45 - 19:00 1.25 DRILL CIRC INTRM2 CBU 550 GPM 1800 PSI. 19:00 - 00:00 5.00 DRILL DRLG INTRM2 Time drilled from 8429' to 8508' to sidetrack well. ~/~"- 1/20/2005 00:00 - 04:30 4.50 DRILL DRLG INTRM2 Time drill off plug from 8508' to 8575' MD Side tracked well @ 8515'. wd/ 04:30 - 12:00 ! 7.50 I DRILL DRLG INTRM2 Drill 8 1/2" hole w/ GeoPilot f/8,575' to 9195' MD 5397' TVD /¡;p~ I ADT 7.4 hrs. (from 8515') WOB 15/21 k RPM 155 GPM 625 @ 2330 psi Þb String wt. PU 240 SO 145 Rot 175 5: n,ot{' Torque on/off btm. - 20,000/18,000 ft Ibs. ECD -10.9 to 11.2 12:00 - 00:00 12.00 DRILL DRLG INTRM2 Drill 8 1/2" hole w/ GeoPilot f/ 9,195' to 10,460' MD 6,002' TVD Printed: 2/14/2005 9:39:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 1/20/2005 12:00 - 00:00 12.00 DRILL DRLG INTRM2 ADT 6.6 hrs. WOB 15/21 k RPM 155 GPM 620 @ 2230 psi String wt. PU 280 SO 140 Rot 180 Torque on/off btm. - 20,000/18,000 ft Ibs. ECD-10.9to 11.4 1/21/2005 00:00 - 12:00 12.00 DRILL DRLG INTRM2 Drill 8 1/2" hole w/ GeoPilot f/10,460' to 11,626' MD 6573' TVD ADT 6.36 hrs WOB 15/25 k RPM 155 GPM 625 @ 2500 psi String wt. PU 305 SO 140 Rot 197 Torque on/off btm. - 25,000/23,000 ft Ibs. ECD - 10.9 to 11.2 12:00 - 21:15 9.25 DRILL DRLG INTRM2 Drill 8 1/2" hole w/ GeoPilot f/11 ,626' to 12,462' MD 6988' TVD ADT 5.94 hrs WOB 15/25 k RPM 155 GPM 625 @ 2630 psi String wt. PU 290 SO 137 Rot 167 Torque on/off btm. - 22,000/21,500 ft Ibs. ECD - 10.9 to 11.2 21:15 - 23:00 1.75 DRILL CIRC INTRM2 Geopilot not responding. Pumped sweep and circulated hole clean. 23:00 - 00:00 1.00 DRILL TRIP INTRM2 POOH with pump backreaming to 11,997'. 1/22/2005 00:00 - 01 :30 1.50 DRILL TRIP INTRM2 Backream from 11,997' to 11534' - 500 gpm /1770 psi / 70 rpm 01 :30 - 01:45 0.25 DRILL OBSV INTRM2 Monitor well, ok, attempt to pull pipe well swabbing. 01:45 - 05:15 3.50 DRILL TRIP INTRM2 Pump out from 11,534' to 9286' - 175 gpm / 450 psi 05: 15 - 05:45 0.50 RIGMNT RGRP INTRM2 Work on Top Drive Grabber 05:45 - 06:00 0.25 DRILL TRIP INTRM2 Attempted to pull pipe - well swabbing 06:00 - 06:45 0.75 DRILL TRIP INTRM2 Pump out from 9286' to 8810' 175 gpm /450 psi 06:45 - 07:15 0.50 RIGMNT RGRP INTRM2 Repair die keepers on grabber - Rig mech inspected grabber system 07:15 - 08:30 1.25 DRILL TRIP INTRM2 Backream from 8810' to 8429' - 500 gpm /1600 psi /90 rpm 08:30 - 08:45 0.25 DRILL OBSV INTRM2 Monitor well, ok. 08:45 - 11 :30 2.75 DRILL TRIP INTRM2 POOH on trip tank from 8429' to 6048' - 10 - 30 k over - hole taking proper fill - pump dry job 11 : 30 - 11:45 0.25 DRILL OBSV INTRM2 Monitor well, ok - some gas bubbling in annulus - no flow. 11:45-12:15 0.50 DRILL TRIP INTRM2 POOH on trip tank - attempted to work past tight spot @ 5917' with 75K over, unable. 12:15 - 13:15 1.00 DRILL TRIP INTRM2 Backream from 5953' to 5667' - 500 gpm /1400 psi / 80 rpm 13:15 -13:30 0.25 DRILL OBSV INTRM2 Monitor well, ok. 13:30 - 16:00 2.50 DRILL TRIP INTRM2 POOH on trip tank from 5667' to 4146' - 10 - 30k over - wiped several tight spots - unable able to pass 4139'. 16:00 - 16:15 0.25 DRILL TRIP INTRM2 Backream from 4146' to 4051' - 280 gpm /520 psi /70 rpm 16:15 -16:30 0.25 DRILL OBSV INTRM2 Flow check well, static. 16:30 - 19:30 3.00 DRILL TRIP INTRM2 POOH on trip tank from 4051' to 709'. 19:30 - 21:15 1.75 DRILL PULD INTRM2 POOH and laydown BHA. Bit balled up. Download MWD. 21 :15 - 00:00 2.75 WELCTL BOPE INTRM2 Set test plug and tested BOP. 1/23/2005 00:00 - 02:00 2.00 WELCTL BOPE INTRM2 Finish testing BOPE - Pull test plug and set wear bushing - blow down lines. 02:00 - 04:00 2.00 RIGMNT RGRP INTRM2 Replaced die carrier on Top Drive grabber system - Worked on Drawworks brake linkage. 04:00 - 05:45 1.75 DRILL PULD INTRM2 MU BHA #3: Bit, GeoPilot, GP flex, stab, GRlPWD, stab, HCIM, initialize tools. 05:45 - 06:15 0.50 DRILL TRIP INTRM2 RIH with flex collars and hwdp to 706'. 06:15 - 07:00 0.75 DRILL DEQT INTRM2 Shallow test tools - troubleshoot low oil light. 07:00 - 07:30 0.50 DRILL TRIP INTRM2 Stand back hwdp and Flex collars 07:30 - 09:00 1.50 DRILL PULD INTRM2 POOH - checked GeoPilot oil resevoir, empty, apparent seal failure. Lat down BHA # 6. 09:00 - 11 :00 2.00 DRILL PULD INTRM2 MU BHA #7: Bit, 7" SperryDrill @ 1.5, FS, DM, stab, GRlPWD, stab, Printed: 2/14/2005 9:39:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon1@ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 1/23/2005 09:00 - 11 :00 2.00 DRILL PULD INTRM2 HCIM, TM, initialize tools. 11 :00 - 12:00 1.00 DRILL TRIP INTRM2 RIH with flex collars and hwdp to 710', shallow test tools. 12:00 - 16:00 4.00 DRILL TRIP INTRM2 RIH to 8049' - no problems - fill pipe every -2000". 16:00 - 16:45 0.75 DRILL INTRM2 Stage pumps up to 500 gpm - circ and cond mud 500 gpm /1670 psi /40 rpm @ 14,000 ftllbs PUW 195K SOW 130K - Blow down Top Drive 16:45 - 19:00 2.25 DRILL TRIP INTRM2 RIH from 8049' to 11,813'. 19:00 - 20:00 1.00 DRILL CIRC INTRM2 Circulated and took tie in surveys for IFR. 20:00 - 20:15 0.25 DRILL TRIP INTRM2 RIH to 12,186'. 20:15 - 21:45 1.50 DRILL REAM INTRM2 Washed to 12,462' (precautionary). 21 :45 - 00:00 2.25 DRILL DRLG INTRM2 Drill 8 1/2" hole w/ MM f/12,462' to 12,557' MD 7036' TVD ADT 1.2 Hrs. ART.7 Hrs. AST .5 Hrs. WOB 5/15 k RPM 80 GPM 620 @ 2830 psi String wt. PU 255 SO 170 Rot 210 Torque on/off btm. - 17,500/16,000 ft Ibs. ECD - 10.6 to 11 1/24/2005 00:00 - 12:00 12.00 DRILL DRLG INTRM2 Drill 8 1/2" hole w/ MM f/12,557' to 13,250' MD 7199' TVD ADT 7.7 Hrs. ART 3.44 Hrs. AST 4.26 Hrs. WOB 12/20 k RPM 80 GPM 620 @ 2850 psi String wt. PU 255 SO 160 Rot 210 Torque on/off btm. -18,500/17,500 ft Ibs. ECD - 10.8 to 11.0 12:00 - 14:15 2.25 DRILL DRLG INTRM2 Drill 8 1/2" hole w/ MM f/13,250' to 13,395' MD 7217' TVD ADT 1.32 Hrs. ART 0.55 Hrs. AST 0.77 Hrs. WOB 15/25 k RPM 80 GPM 605 @ 2870 psi String wt. PU 260 SO 160 Rot 210 Torque on/off btm. - 18,500/18,000 ft Ibs. ECD - 10.9 to 11.0 14:15 - 16:00 1.75 DRILL DRLG INTRM2 Circ and condition mud - 600 gpm /2700 psi /95 rpm /17,000 ftllbs ECD=10.9 ppg 16:00 - 18:15 2.25 DRILL WIPR INTRM2 Backream from 13,395' to 12,186' - 500 gpm / 2020 psi / 70 rpm 18:15 - 19:00 0.75 DRILL WIPR INTRM2 RIH and washed to 13395'. 19:00 - 20:30 1.50 DRILL CIRC INTRM2 CBU 600 GPM. 2690 PSI. ECD 10.8. 20:30 - 22:30 2.00 DRILL WIPR INTRM2 Backream from 13,395' to 12,186' - 500 gpm / 2020 psi / 70 rpm. 22:30 - 23:15 0.75 DRILL WIPR INTRM2 RIH and washed to 13395'. 23:15 - 00:00 0.75 DRILL CIRC INTRM2 Pumped sweep and circulated. 600 GPM 2700 PSI. 1/25/2005 00:00 - 01 :30 1.50 DRILL CIRC INTRM2 Circulated hole clean. ECD 10.6. 01 :30 - 03:00 1.50 DRILL TRIP INTRM2 POOH spottong pill @ 3 BPM. to 12,093'. 03:00 - 12:00 9.00 DRILL TRIP INTRM2 POOH on IT to 777'. Observed well @ casing shoe. 12:00 - 13:30 1.50 DRILL PULD INTRM2 Stood back HWDP and laid down BHA. 13:30 - 14:45 1.25 CASE OTHR INTRM2 Pulled wear bushing. Changed saver sub. 14:45 - 16:45 2.00 CASE RURD INTRM2 Rigged up to run casing. Changed rams to 7" and tested. Installed thin wear ring. 16:45 -19:15 2.50 RIGMNT RGRP INTRM2 Repaired high gear chain in draw works. 19:15-23:15 4.00 CASE RUNC INTRM2 PJSM. Ran 100 Jts. 7" 26# L 80 BTCM casing to 4,250'. 23:15 - 00:00 0.75 CASE CIRC INTRM2 Circulated casing volume @ 5 BPM. 1/26/2005 00:00 - 03:45 3.75 CASE RUNC INTRM2 Ran 87 Jts. 7" 26# L 80 BTCM casing to 7,972'. 03:45 - 04:45 1.00 CASE CIRC INTRM2 CBU. 5 BPM 540 PSI. 04:45 - 08:45 4.00 CASE RUNC INTRM2 Ran 83 Jts. 7" 26# L 80 BTCM casing to 11,514'. 08:45 - 10:00 1.25 CASE CIRC INTRM2 CBU 4 BPM 570 PSI. 10:00 - 12:30 2.50 CASE RUNC INTRM2 Ran 43 Jts. 7" 26# L 80 BTCM casing to 13,348'. Picked up landing Jt. and landed casing @ 13,382'. 12:30 - 13:00 0.50 CASE RURD INTRM2 Laid down circulating tool and rigged up cement head. Printed: 2/14/2005 9:39:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon 1 @ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 1/26/2005 13:00 - 15:45 15:45 - 18:00 2.75 CEMENTCIRC INTRM2 2.25 CEMENT PUMP INTRM2 1/27/2005 18:00 - 22:00 4.00 CEMENTOTHR INTRM2 22:00 - 23:00 1.00 CEMENT RURD INTRM2 23:00 - 00:00 1.00 CASE DEQT INTRM2 00:00 - 01 :00 1.00 CASE RURD INTRM2 01 :00 - 02:30 1.50 WELCTL BOPE INTRM2 02:30 - 03:30 1.00 CASE RURD INTRM2 03:30 - 13:45 10.25 DRILL PULD INTRM2 13:45 -14:30 0.75 DRILL RIRD INTRM2 14:30 - 21:15 6.75 DRILL PULD INTRM2 21:15 - 21:45 0.50 DRILL CIRC INTRM2 21 :45 - 00:00 2.25 DRILL TRIP INTRM2 00:00 - 00:45 0.75 DRILL TRIP INTRM2 00:45 - 03: 15 2.50 DRILL PULD INTRM2 03:15 - 04:00 0.75 DRILL OTHR INTRM2 04:00 - 05:30 1.50 DRILL PULD INTRM2 05:30 - 17:00 11.50 DRILL PULD INTRM2 17:00 - 18:30 1.50 RIGMNT RSRV INTRM2 18:30 - 21 :00 2.50 DRILL PULD INTRM2 21 :00 - 22:00 1.00 DRILL REAM INTRM2 22:00 - 22:30 0.50 DRILL CIRC INTRM2 22:30 - 00:00 1.50 CASE MIT INTRM2 00:00 - 02:30 2.50 CEMENT DSHO INTRM2 02:30 - 03:00 0.50 DRILL DRLG INTRM2 1/28/2005 1/29/2005 03:00 - 04:00 04:00 - 05:00 05:00 - 07:30 07:30 - 12:00 1.00 DRILL CIRC INTRM2 1.00 CEMENT FIT INTRM2 2.50 DRILL CIRC PROD 4.50 DRILL DRLH PROD 12:00 - 00:00 12.00 DRILL DRLH PROD Circulated and worked pipe. 2-5 BPM 580 PSI. PJSM for cement job. Cemented 7" casing as follows: Pumped 5 bbls CW1 00 - Test lines to 3700 psi - Pumped 45 bbls Cw100 @ 8.3 ppg 5.5 bpm @ 500 psi. Pumped 40 bbls Mud Push XL 10.5 ppg @ 5.5 bpm / 550 psi - Dropped bottom plug - Mix & pumped 44.6 bbls of Class G w/ 0.2% 046, 0.3% 065,0.40% 0167, .1% B155@ 15.8 ppg 5.2 bpm / 560 psi Dropped top plug w/ 20 bbls water f/ Dowell Switched to rig pumps & displaced w/ 494 bbls of 9.8 ppg LSND mud - @ 6 - 3.5 bbls/min - 440 to 500 psi- plug not bumped CIP @ 1800 hrs. Floats did not hold. Good returns while cementing. WOC. Well shut in and casing shut in. Opened casing and well No Flow. Rigged down cement tools. Installed and tested FMC packoff. Laid down pack off running tool and long bales. Set test plug. Changed and tested top rams + 4" floor valves 250/5000 PSI. Put on standard bales and installed wear bushing. Laid down 5" drill pipe from derrick in mousehole. Changed out pipe handling tools to 4". Picked up and RIH 240 Jts 4" DP from pipe shed. CBU to clear DP. POOH to 2671' standing back 4" DP. POOH and stood back 4" DP. Picked up BHA. Uploaded MWD. RIH with Flex collars and tested MWD. RIH Picking up 4" DP and installing Lo Tads to 10,994'. Slipped and cut drilling line. Continued RIH picking up 4" DP and installing Lo Tads to 12,870'. Washed down to 13,240' tagged Cement. CBU. Blew down TO and RU to test casing. Tested casing to 3500 PSI for 30 Min. Rigged down test lines. Drilled up shoe track and cleaned out rathole to 13,395'. Drill 6 1/8" horizontal section f/ 13,395' to 13,415' MD 7218' TVD ADT - .45 hrs. = ART - .2 hrs. AST - .25 hrs. WOB 3/6 k RPM's 0/40 GPM 220 @ 2000 psi String wt. PU 240 SO 135 Rot 175 Torque on/off btm. - 15,000/15,000 ftllbs. Average ECD - 10.1 to 10.2 ppg CBU. Rigged up and Performed FIT tp 12.47 PPG EMW. Rigged down. PJSM Displaced to MOBM and cleaned out surface system. Drill 6 1/8" horizontal section f/ 13,415' to 13,660' MD 7221' TVD ADT - 2.63 hrs. = ART - 2.13 hrs. AST - .5 hrs. WOB 3/6 k RPM's 0/40 GPM 220 @ 2200 psi String wt. PU 250 SO 130 Rot 177 Torque on/off btm. - 15,000/15,000 ftllbs. Average ECD -10.1 to 10.2 ppg Drill 6 1/8" horizontal section f/ 13,660' to 14,403' MD 7227' TVD ADT - 7.37 hrs. = ART - 5.27 hrs. AST - 2.1 hrs. WOB 9/10 k RPM's 0/75 GPM 220 @ 2870 psi String wt. PU 245 SO 130 Rot 177 Printed: 2/14/2005 9:39:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 1/29/2005 12:00 - 00:00 12.00 DRILL DRLH PROD Torque on/off btm. - 15,000/14,500 ftllbs. Average EGD - 10.1 to 10.7 ppg 1/30/2005 00:00 - 12:00 12.00 DRILL DRLH PROD Drill 6 1/8" horizontal section f/ 14,403' to 15,046' MD 7222' TVD ADT - 7.91 hrs. = ART - 6.44 hrs. AST - 1.47 hrs. WOS 8/11 k RPM's 0/80 GPM 220 @ 3000 psi String wt. PU 250 SO 128 Rot 175 Torque on/off btm. - 14,500/14,000 ftllbs. Average EGD - 10.4 to 10.7 ppg 12:00 - 00:00 12.00 DRILL DRLH PROD Drill 6 1/8" horizontal section f/ 15,046' to 15,674' MD 7221' TVD ADT - 8.25 hrs. = ART - 6.99 hrs. AST - 1.26 hrs. WOS 7/10 k RPM's 0/85 GPM 220 @ 3070 psi String wt. PU 255 SO 130 Rot 175 Torque on/off btm. - 15,500/15,000 ftllbs. Average EGD - 10.5 to 10.9 ppg 1/31/2005 00:00 - 12:00 12.00 DRILL DRLH PROD Drill 6 1/8" horizontal section f/15,674' to 16,110' MD 7215' TVD ADT - 7.94 hrs. = ART - 5.2 hrs. AST - 2.74 hrs. WOS 8/15 k RPM's 0/80 GPM 220 @ 3150 psi String wt. PU 255 SO 125 Rot 175 Torque on/off btm. - 15,000/14,500 ftllbs. Average EGD - 10.5 to 10.9 ppg 12:00 - 00:00 12.00 DRILL DRLH PROD Drill 6 1/8" horizontal section f/ 16,110' to 16,772' MD 7206' TVD ADT - 8.27 hrs. = ART - 7.26 hrs. AST - 1.01 hrs. WOS 9/15 k RPM's 0/85 GPM 220 @ 3170 psi String wt. PU 250 SO 127 Rot 172 Torque on/off btm. - 15,500/15,000 ftllbs. Average EGD - 10.5 to 10.9 ppg 2/1/2005 00:00 - 12:00 12.00 DRILL DRLH PROD Drill 6 1/8" horizontal section f/16,772' to 17,300' MD 7210' TVD ADT - 8.91 hrs. = ART - 7.94 hrs. AST- .97 hrs. WOS - 10/15 k RPM - 85 GPM - 220 @ 3200 psi String wt. PU 255 So 125 Rot 172 Torque on/off btm. - 15,500/15,000 ft. Ibs. EDG - 10.8 to 10.9 12:00 - 00:00 12.00 DRILL DRLH PROD Drill 6 1/8" horizontal section f/17,300' to 17,753' MD 7208' TVD ADT - 7.22 hrs. = ART - 5.59 hrs. AST- 1.63 hrs. WOS - 9/15 k RPM - 85 GPM - 220 @ 3260 psi String wt. PU 255 So 124 Rot 171 Torque on/off btm. - 16,000/15,500 ft. Ibs. EDG -10.8 to 11.1 2/2/2005 00:00 - 12:00 12.00 DRILL DRLH PROD Drill 6 1/8" horizontal section f/ 17,753' to 18,195' MD 7202' TVD ADT - 8.92 hrs. = ART - 6.13 hrs. AST - 2.79 hrs. WOS 9/12 k RPM 85 GPM 220 @ 3320 psi String wt. PU 265 SO 120 Rot 170 Torque on/off btm. - 16,000/15,500 ftllbs. EGD - 11.1 12:00 - 00:00 12.00 DRILL DRLH PROD Drill 6 1/8" horizontal section f/ 18,195' to 18,635' MD 7196' TVD ADT - 7.99 hrs. = ART - 5.15 hrs. AST - 2.84 hrs. WOS 10/12 k RPM 85 GPM 220 @ 3300 psi String wt. PU 260 SO 120 Rot 172 Torque on/off btm. - 16,500/16,000 ftllbs. EGD - 11.2 2/3/2005 00:00 - 12:00 12.00 DRILL DRLH PROD Drill 6 1/8" horizontal section f/ 18,635' to 19,009' MD 7192' TVD I ADT - 8.95 hrs. = ART - 4.65 hrs. AST - 4.3 hrs. WOS 10/13 k RPM 80 GPM 220 @ 3300 psi Printed: 2114/2005 9:39:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon 1 @ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 2/3/2005 00:00 - 12:00 12.00 DRILL DRLH PROD 12:00 - 00:00 12.00 DRILL DRLH PROD 2/4/2005 00:00 - 08:30 8.50 DRILL CIRC PROD 08:30 - 12:00 3.50 DRILL TRIP PROD 12:00 - 21 :00 9.00 DRILL TRIP PROD 21 :00 - 22:30 1.50 DRILL CIRC PROD 22:30 - 00:00 1.50 DRILL TRIP PROD 2/5/2005 00:00 - 10:30 10.50 DRILL TRIP PROD 10:30 - 14:00 3.50 DRILL TRIP PROD 14:00 - 16:00 2.00 DRILL TRIP PROD 16:00 - 17:00 1.00 DRILL OTHR CMPL TN 17:00 - 18:00 1.00 CMPL TN RURD CMPL TN 18:00 - 00:00 6.00 CMPL TN RUNT CMPL TN 2/6/2005 100:00 - 04:30 4.50 CMPL TN RUNT CMPL TN 04:30 - 05:30 1.00 CMPL TN RUNT CMPL TN 05:30 - 09:00 3.50 CMPL TN RUNT CMPL TN ¡ i 09:00 - 10:30 1.50 CMPL TN RUNT CMPL TN I 110:30 - 11 :00 0.50 CMPL TN RUNT CMPL TN 11 :00 - 15:00 4.00 CMPL TN PULD CMPL TN 15:00 - 16:30 16:30 - 18:00 18:00 - 20:00 1.50 CMPL TN OTHR CMPL TN 1.50 CMPL TN NUND CMPL TN 2.00 CMPL TN NUND CMPL TN String wt. PU 260 SO 117 Rot 170 Torque onloff btm. - 16,000/15,500 ftllbs. ECD - 11.2 to 11.4 Drill 6 1/8" horizontal section f/19,009' to 19359' MD 7175' TVD 0- ADT - 7.31 hrs. = ART - 4.3 hrs. AST - 3.01 hrs. WOB 10/13 k RPM 80 GPM 220 @ 3560 psi String wt. PU 260 SO 116 Rot 170 Torque onloff btm. - 16,000/15,500 ftllbs. ECD - 11.2 to 11.4 POOH wI pump to 19,185' (2 stds) Circulate hole clean & bump mud wt. to 9.3 ppg for trip out - 80 RPM 180 GPM @ 2450 psi Flow check well (static) POOH wI pump & backreaming - 50 RPM 180 gpm @ 2290 psi String wt PU 260 SO 120 Continue POOH wI pump & backreaming f/17,752' to 13,368. 50 RPM 180 gpm @ 1950 psi String wt PU 240 SO 115 Circ and condition mud at 211 gpm - 2760 psi - 80 rpms. POH wI pump from 13,368' to 12,775' at 180 gpm at 1560 psi. Continue to POOH wI pump f/12,775' to 5140' - Attempted to pull on TT @ 11,290',8920' & 6475' - incorrect hole fill Flow check - well static - POOH on TT f/5140' to 375' - hole took correct fill Monitor well @ HWDP - well static - Handle BHA - Stand back HWDP - NM flex DC's - Down load MWD - flush MWD & motor wI mineral oil - break off bit - LD MWD & motor Pull wear bushing - clean up rig floor RU to run 3 1/2" completion - Held Pre-job safety meeting Run 31/2" completion as follows: WLEG, 10' 3 1/2" 9.3# pup jt.- XN nipple - 1 jt. 3 1/2" 9.3# L-80 EUE tbg - Baker premier packer - (all connections below packer made up w/BakerLoc) - 2 jts. 3 1/2" 9.3# L-80 EUE tbg - Baker CMD sliding sleeve - 2 jts. 3 1/2" 9.3# L-80 EUE tbg - Cameo KBUG GLM - 87 jts. 3 1/2" 9.3# L-80 EUE tbg - Cameo KBUG GLM - Total of 170 jts. of 400 as of midnight. Continue running 3 1/2" completion - Ran total of 329 jts. to 10,256' PJSM - MU Cameo SSSV - install control line - test to 5000 psi for 10 mins. Contiune RIH wI completion - Ran 71 jts. 3 1/2" 9.3# L-80 EUE (400 jts. total) to 12,435' MU XO (3 1/2" x 41/2") Run 2 Jts. 41/2" 12.3# L-80 IBTM tgb - MU control line to tbg hanger & test to 5000 psi - Land tbg in wellhead on FMC tbg hanger wI tail @ 12,560' - XN @ 12,548', Packer @ 12,500', Sliding sleeve @ 12,417', GLM's @ 12,330', 9632', & 5435', SSSV @ 2314' RILD - LD landing jt. A - Set 1WC - PU Landing jt. B - Attempt to test hanger seals to 5000 psi - Hanger seals wouldn't test Pull1WC - Unseat & Pull tbg hanger to surface - Disconnect control line - Change out tbg hanger (fl metal to metal seal to Elastemer seals) Reconnect control line & test - Reland tbg wI tail @ 12,560' - all others components at same depth as before - RILD - set 1WC - Test seals to 5000 psi OK - LD landing Jt. B MU stack washer & flush stack, Blow down lines. Nipple down BOPE, Change saver sub to 4-1/2" IF Nipple up Tree, Test same to 5000 PSI, Pull1WC Printed: 2/14/2005 9:39:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-21 CD2-21 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 12/23/2004 Rig Release: 2/8/2005 Rig Number: 19 Spud Date: 12/21/2004 End: 2/8/2005 Group: 2/6/2005 20:00 - 22:00 2.00 CMPL TN FRZP CMPL TN Rig up sqeeze manifold, PJSM, Test lines to 4500 PSI. 22:00 - 00:00 2.00 CMPL TN FRZP CMPL TN Change well over to diesel w/441 bbls to 12,560', Pumping down tbg holding back pressure on annulus thru choke @ 3 bpm. 2/7/2005 00:00 - 01 :30 1.50 CMPL TN OTHR CMPL TN Finish displacing well to diesel - pumped 461 bbls @ 3 bbls/min 01 :30 - 05:00 3.50 CMPL TN PCKR CMPL TN RU lubricator - drop packer setting ball/rodassembly - Test lines to 4700 psi - Pressure up on tbg to 4000 psi to set packer - Test tbg to 4000 psi for 30 mins. - Test 3 1/2" x 7" annulus to 3500 psi for 30 mins. - Bleed annulus to 0 - shut in tbg pressure 450 psi - clean oput lines & rig down lines & squeeze manifold 05:00 - 06:00 1.00 CMPL TN OTHR CMPL TN RU FMC lubricator - Set BPV - Secure well 06:00 - 20:30 14.50 CMPLTN OTHR CMPL TN PJSM - Install mouse hole - LD excess DP f/ derrick via mouse hole for rig move 20:30 - 00:00 3.50 CMPL TN OTHR CMPL TN Clean floor & pits of MOBM. 2/8/2005 00:00 - 02:00 2.00 CMPL TN OTHR CMPL TN Finish cleaning rig f/ OBM 02:00 - 05:00 3.00 CMPL TN OTHR CMPL TN Finish LD excess DP - LD NMFC - HWDP & Jars - LD MH · Release Rig @ 0500 hrs. Move to CD2-59 Printed: 2/14/2005 9:39:43 AM -- ~' ConocoPhillips Alaska, Inc. Alaska North Slope North Slope, Alaska CD2-21 Job No. AKZZ3458623, Surveyed: 3 February, 2005 Survey Report 18 February, 2005 Your Ref: API 501032050400 Surface Coordinates: 5974582.28 N, 371702.51 E (70020' 19.6421" N, 151002' 27.8701" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 ,/ Kelly Bushing Elevation: 53.00ft above Mean Sea Level ~ 5pe............y-5uf1 b AICL I N cf··· s e'R V I c fiS!? A Halliburton Company ConocoPhillips -"laska, Inc. Survey Report k D2-21 Your Ref: API 501l1:f2050400 Job No. AKZZ3458623, Surveyed: 3 February, 2005 Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 8427.17 62.140 302.340 4947.76 5000.76 3072.37 N 5379.13 W 5977746.24 N 366376.74 E 8515.00 62.070 302.820 4988.85 5041.85 3114.17N 5444.54 W 5977789.15 N 366312.05 E 0.490 8588.29 59.360 303.300 5024.70 5077.70 3149.04 N 5498.11 W 5977824.93 N 366259.09 E 3.741 8685.01 60.700 303.530 5073.02 5126.02 3195.18N 5568.04 W 5977872.26 N 366189.95 E 1.401 8780.06 60.680 303.230 5119.55 5172.55 3240.78 N 5637.25 W 5977919.04 N 366121.53 E 0.276 8875.58 61.950 300.530 5165.40 5218.40 3285.02 N 5708.40 W 5977964.49 N 366051.15 E 2.814 8970.77 61.030 299.180 5210.84 5263.84 3326.66 N 5780.94 W 5978007.37 N 365979.33 E 1.577 9064.99 59.850 296.930 5257.32 5310.32 3365.21 N 5853.26 W 5978047.15 N 365907.69 E 2.425 9160.72 60.230 297.460 5305.13 5358.13 3403.11 N 5927.03 W 5978086.31 N 365834.58 E 0.623 9255.64 59.860 297.040 5352.53 5405.53 3440.77 N 6000.14 W 5978125.21 N 365762.12 E 0.547 9350.93 59.900 297.800 5400.34 5453.34 3478.73 N 6073.30 W 5978164.41 N 365689.62 E 0.691 9445.92 59.970 300.680 5447.94 5500.94 3518.88 N 6145.03 W 5978205.79 N 365618.59 E 2.625 9541 .27 60.510 301.600 5495.27 5548.27 3561.68 N 6215.87 W 5978249.80 N 365548.49 E 1.011 9636.32 60.670 301.680 5541.94 5594.94 3605.12 N 6286.36 W 5978294.43 N 365478.75 E 0.184 9732.02 60.920 301.830 5588.64 5641.64 3649.08 N 6357.39 W 5978339.60 N 365408.48 E 0.295 9827.30 60.680 300.920 5635.12 5688.12 3692.39 N 6428.40 W 5978384.12 N 365338.23 E 0.871 9922.93 60.650 301.710 5681.97 5734.97 3735.71 N 6499.62 W 5978428.66 N 365267.76 E 0.721 10017.90 60.420 301.710 5728.69 5781.69 3779.18 N 6569.97 W 5978473.32 N 365198.17 E 0.242 10109.62 59.780 300.210 5774.41 5827.41 3820.08 N 6638.15 W 5978515.38 N 365130.70 E 1.580 10201.14 59.860 299.840 5820.42 5873.42 3859.67 N 6706.64 W 5978556.13 N 365062.89 E 0.360 10296.24 60.170 300.140 5867.95 5920.95 3900.84 N 6777.99 W 5978598.52 N 364992.26 E 0.425 10389.22 60.140 300.690 5914.22 5967.22 3941.67 N 6847.54 W 5978640.54 N 364923.42 E 0.514 10482.40 61.090 300.450 5959.94 6012.94 3982.96 N 6917.44 W 5978683.02 N 364854.23 E 1.044 10575.78 59.910 299.740 6005.93 6058.93 4023.72 N 6987.76 W 5978724.97 N 364784.62 E 1.426 10668.93 60.060 299.990 6052.52 6105.52 4063.88 N 7057.70 W 5978766.33 N 364715.37 E 0.283 10762.09 60.260 301.760 6098.88 6151.88 4105.35 N 7127.05 W 5978808.97 N 364646.74 E 1.662 10855.12 60.260 302.690 6145.03 6198.03 4148.42 N 7195.39 W 5978853.21 N 364579.16 E 0.868 10948.17 60.550 302.750 6190.98 6243.98 4192.16 N 7263.46 W 5978898.10 N 364511.84 E 0.317 11041.18 61.330 302.510 6236.16 6289.16 4235.99 N 7331.93 W 5978943.10 N 364444.13 E 0.868 11132.13 61.020 302.330 6280.01 6333.01 4278.71 N 7399.19 W 5978986.97 N 364377.61 E 0.382 11224.84 61 .140 301.160 6324.84 6377.84 4321.41 N 7468.20 W 5979030.84 N 364309.35 E 1.112 11318.13 61.260 303.820 6369.79 6422.79 4365.31 N 7537.14 W 5979075.92 N 364241.16 E 2.502 11411.20 60.750 301.320 6414.91 6467.91 4409.14 N 7605.74 W 5979120.91 N 364173.33 E 2.412 11504.34 60.530 298.950 6460.58 6513.58 4449.89 N 7675.93 W 5979162.85 N 364103.84 E 2.230 11595.56 60.680 298.660 6505.36 6558.36 4488.18 N 7745.57 W 5979202.33 N 364034.86 E 0.322 18 February, 2005 - 10:26 Page 20f6 ConocoPhillips JJ.laska, Inc. '-" Survey Report.. D2-21 Your Ref: API 5017J!2050400 Job No. AKZZ3458623, Surveyed: 3 February, 2005 Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 11688.98 60.190 301.050 6551.46 6604.46 4528.62 N 7816.04 W 5979243.97 N 363965.10 E 2.286 11782.22 59.660 300.950 6598.18 6651.18 4570.18 N 7885.20 W 5979286.71 N 363896.66 E 0.576 11876.14 60.610 299.940 6644.95 6697.95 4611.45 N 7955.42 W 5979329.17 N 363827.16 E 1.376 11968.94 59.820 300.430 6691.05 6744.05 4651.94 N 8025.04 W 5979370.85 N 363758.24 E 0.967 12060.52 59.940 301.230 6737.01 6790.01 4692.54 N 8093.06 W 5979412.60 N 363690.93 E 0.767 12153.47 60.930 301.880 6782.87 6835.87 4734.85 N 8161.95W 5979456.09 N 363622.77 E 1.227 12247.94 61.010 302.960 6828.71 6881.71 4779.13 N 8231.68 W 5979501.56 N 363553.81 E 1.003 12339.08 60.270 302.670 6873.40 6926.40 4822.18 N 8298.43 W 5979545.74 N 363487.80 E 0.858 12432.21 59.780 304.160 6919.93 6972.93 4866.60 N 8365.77 W 5979591.31 N 363421.23 E 1.482 12524.65 62.670 305.360 6964.42 7017.42 4912.80 N 8432.32 W 5979638.64 N 363355.48 E 3.327 12617.13 65.680 307.330 7004.71 7057.71 4962.14 N 8499.35 W 5979689.12 N 363289.31 E 3.777 12710.29 69.910 306.370 7039.91 7092.91 5013.84 N 8568.36 W 5979742.00 N 363221.20 E 4.640 12802.69 75.950 310.230 7067.03 7120.03 5068.59 N 8637.60 W 5979797.92 N 363152.90 E 7.659 12895.28 76.540 312.460 7089.05 7142.05 5128.00 N 8705.11 W 5979858.4 7 N 363086.42 E 2.425 12986.32 77.070 316.140 7109.83 7162.83 5189.89 N 8768.53 W 5979921.44 N 363024.06 E 3.978 13078.49 78.000 319.430 7129.73 7182.73 5256.54 N 8828.99 W 5979989.11 N 362964.76 E 3.628 13171.27 81.640 322.950 7146.13 7199.13 5327.68 N 8886.19 W 5980061.23 N 362908.78 E 5.416 13264.79 85.820 323.350 7156.34 7209.34 5402.06 N 8941.93 W 5980136.54 N 362854.32 E 4.490 13358.54 87.060 327.620 7162.17 7215.17 5479.14 N 8994.93 W 5980214.52 N 362802.65 E 4.734 13415.87 89.010 330.700 7164.13 7217.13 5528.32 N 9024.30 W 5980264.20 N 362774.13 E 6.356 13511.52 89.500 333.120 7165.38 7218.38 5612.69 N 9069.33 W 5980349.33 N 362730.55 E 2.581 13607.04 88.890 332.970 7166.72 7219.72 5697.83 N 9112.62 W 5980435.19 N 362688.71 E 0.658 13702.61 88.390 333.150 7168.99 7221.99 5783.00 N 9155.91 W 5980521.09 N 362646.89 E 0.556 13797.85 88.820 332.710 7171.31 7224.31 5867.78 N 9199.24 W 5980606.60 N 362605.02 E 0.646 13893.55 89.380 332.330 7172.81 7225.81 5952.67 N 9243.39 W 5980692.24 N 362562.33 E 0.707 13988.85 88.390 331.990 7174.67 7227.67 6036.93 N 9287.89 W 5980777.24 N 362519.28 E 1.098 14084.79 89.070 331.570 7176.79 7229.79 6121.44N 9333.24 W 5980862.52 N 362475.38 E 0.833 14180.13 89.390 331.760 7178.07 7231.07 6205.35 N 9378.49 W 5980947.19 N 362431.57 E 0.390 14275.44 90.800 332.280 7177.91 7230.91 6289.52 N 9423.20 W 5981032.11 N 362388.30 E 1.577 14370.75 90.320 331.370 7176.98 7229.98 6373.53 N 9468.20 W 5981116.88 N 362344.75 E 1.079 14466.06 90.370 331.890 7176.41 7229.41 6457.39 N 9513.49 W 5981201.50 N 362300.90 E 0.548 14561.32 90.180 333.480 7175.95 7228.95 6542.02 N 9557.20 W 5981286.87 N 362258.65 E 1.681 14657.02 91.550 333.340 7174.51 7227.51 6627.59 N 9600.03 W 5981373.16 N 362217.29 E 1.439 14751.57 90.740 334.460 7172.62 7225.62 6712.48 N 9641.62 W 5981458.75 N 362177.16 E 1.462 14846.57 91.240 333.340 7170.98 7223.98 6797.78 N 9683.40 W 5981544.75 N 362136.84 E 1.291 18 February, 2005 -10:26 Page 30f6 ConocoPhillips ~/aska Inc. Survey Report~D2-21 Your Ref: API 501 . 2050400 Job No. AKZZ3458623, Surveyed: 3 February, 2005 Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 14941.86 90.620 332.200 7169.43 7222.43 6882.50 N 9727.00 W 5981630.20 N 362094.70 E 1.362 15037.05 90.130 331.520 7168.81 7221.81 6966.43 N 9771.89 W 5981714.89 N 362051.25 E 0.880 15132.47 89.880 332.160 7168.80 7221.80 7050.56 N 9816.92 W 5981799.77 N 362007.66 E 0.720 15227.83 90.120 334.160 7168.80 7221.80 7135.64 N 9859.97 W 5981885.58 N 361966.07 E 2.112 15323.11 89.870 333.920 7168.81 7221.81 7221.30 N 9901.68 W 5981971.95 N 361925.83 E 0.364 15418.39 89.510 333.500 7169.32 7222.32 7306.73 N 9943.88 W 5982058.08 N 361885.10 E 0.581 15514.12 89.760 332.700 7169.93 7222.93 7392.10 N 9987.19 W 5982144.18 N 361843.26 E 0.876 15609.44 90.610 333.000 7169.62 7222.62 7476.91 N 10030.69 W 5982229.73 N 361801.22 E 0.946 15704.76 89.940 333.040 7169.17 7222.17 7561.86 N 10073.93 W 5982315.40 N 361759.44 E 0.704 15800.27 90.490 332.510 7168.81 7221.81 7646.78 N 10117.63 W 5982401.06 N 361717.20 E 0.800 15895.59 90.360 331.590 7168.10 7221.10 7730.98 N 10162.30 W 5982486.01 N 361673.97 E 0.975 15991.07 92.590 329.960 7165.64 7218.64 7814.27 N 10208.90 W 5982570.09 N 361628.81 E 2.893 16033.82 91.980 329.490 7163.94 7216.94 7851.16 N 10230.43 W 5982607.34 N 361607.91 E 1.801 16086.17 91.920 329.650 7162.16 7215.16 7896.28 N 10256.93 W 5982652.90 N 361582.19 E 0.326 16181.63 91.300 330.620 7159.48 7212.48 7979.03 N 10304.45 W 5982736.45 N 361536.09 E 1.206 16277.15 90.670 331.460 7157.83 7210.83 8062.59 N 10350.69 W 5982820.79 N 361491.29 E 1.099 16372.62 90.930 331.370 7156.50 7209.50 8146.41 N 10396.37 W 5982905.38 N 361447.05 E 0.288 16468.03 90.490 331.950 7155.32 7208.32 8230.38 N 10441.65 W 5982990.11 N 361403.21 E 0.763 16563.26 90.440 331.530 7154.55 7207.55 8314.26 N 10486.74 W 5983074.75 N 361359.56 E 0.444 16659.18 90.490 333.070 7153.77 7206.77 8399.18 N 10531.33 W 5983160.42 N 361316.44 E 1.606 16754.82 89.630 333.030 7153.67 7206.67 8484.43 N 10574.67 W 5983246.40 N 361274.56 E 0.900 16850.29 89.760 333.290 7154.18 7207.18 8569.62 N 10617.77 W 5983332.31 N 361232.92 E 0.304 16945.76 90.500 332.520 7153.96 7206.96 8654.61 N 10661.26 W 5983418.04 N 361190.90 E 1.119 17041.03 89.130 333.020 7154.27 7207.27 8739.32 N 10704.85 W 5983503.48 N 361148.76 E 1.531 17136.67 88.950 332.900 7155.87 7208.87 8824.49 N 10748.32 W 5983589.38 N 361106.75 E 0.226 17232.06 89.880 332.170 7156.84 7209.84 8909.12 N 10792.31 W 5983674.76 N 361064.21 E 1.239 17327.80 91.600 331.530 7155.61 7208.61 8993.53 N 10837.47 W 5983759.92 N 361020.50 E 1.917 17422.96 89.750 330.730 7154.48 7207.48 9076.85 N 10883.41 W 5983844.02 N 360976.00 E 2.118 17516.33 89.510 330.560 7155.09 7208.09 9158.23 N 10929.19 W 5983926.17 N 360931.62 E 0.315 17613.75 89.930 331.260 7155.56 7208.56 9243.36 N 10976.55 W 5984012.10 N 360885.72 E 0.838 17709.57 90.550 331.150 7155.16 7208.16 9327.33 N 11022.70 W 5984096.84 N 360841.01 E 0.657 17805.01 90.430 331.880 7154.35 7207.35 9411.21 N 11068.22 W 5984181.49 N 360796.94 E 0.775 17900.61 91.110 332.030 7153.06 7206.06 9495.58 N 11113.16 W 5984266.62 N 360753.45 E 0.728 17995.86 90.800 331.890 7151.47 7204.47 9579.64 N 11157.93 W 5984351.43 N 360710.12 E 0.357 18091.52 90.800 330.620 7150.14 7203.14 9663.50 N 11203.93 W 5984436.06 N 360665.56 E 1.327 18 February, 2005 -10:26 Page 40f6 ConocoPhillips Jt.laska, Inc. Survey Report, .D2-21 Your Ref: API 5011T12050400 Job No. AKZZ3458623, Surveyed: 3 February, 2005 Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 18187.03 89.810 329.870 7149.63 7202.63 9746.41 N 11251.33 W 5984519.78 N 360619.59 E 1.300 18282.52 91.170 328.770 7148.81 7201.81 9828.53 N 11300.05 W 5984602.72 N 360572.28 E 1.832 18378.18 91.480 328.930 7146.60 7199.60 9910.38 N 11349.52 W 5984685.40 N 360524.22 E 0.365 18473.88 90.380 328.950 7145.05 7198.05 9992.34 N 11398.89 W 5984768.20 N 360476.26 E 1.150 18569.45 91.350 329.580 7143.61 7196.61 10074.48 N 11447.72 W 5984851.16 N 360428.84 E 1.210 18664.65 93.140 329.210 7139.88 7192.88 10156.35 N 11496.15 W 5984933.85 N 360381.82 E 1.920 18760.07 89.440 330.970 7137.73 7190.73 10239.02 N 11543.71 W 5985017.32 N 360335.68 E 4.294 18855.60 88.700 331.310 7139.28 7192.28 10322.68 N 11589.81 W 5985101.75 N 360291.02 E 0.852 18951.14 90.430 331.600 7140.00 7193.00 10406.60 N 11635.46 W 5985186.44 N 360246.81 E 1.836 19046.53 91.300 331.230 7138.56 7191.56 10490.35 N 11681.10W 5985270.96 N 360202.62 E 0.991 19141.82 92.530 331.290 7135.38 7188.38 10573.85 N 11726.89 W 5985355.23 N 360158.26 E 1.292 19237.45 93.760 331.140 7130.13 7183.13 10657.54 N 11772.87 W 5985439.69 N 360113.72 E 1.296 ./ 19359.00 93.760 331.140 7122.16 7175.16 ./ 10763.76 N 11831.41 W 5985546.91 N 360057.00 E 0.000 All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to 53 ft above MSL. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 313.330° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 19359.00ft., The Bottom Hole Displacement is 15995.03ft., in the Direction of 312.295° (True). 18 February, 2005 - 10:26 Page 5 0'6 ConocoPhillips , /' 'aska, Inc. Survey Report f0w-/2-21 Your Ref: API 501032050400 Job No. AKZZ3458623, Surveyed: 3 February, 2005 Alaska North Slope Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 8427.17 8515.00 19359.00 5000.76 5041.85 7175.16 3072.37 N 3114.17 N 10763.76 N 5379.13 W 5444.54 W 11831.41 W Tie On Point Window Point Projected Survey Survey tool program for CD2-21 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 793.00 0.00 793.00 786.03 19359.00 786.03 CB-SS-Gyro (CD2-21 PB 1) 7175.16 MWD+IIFR+MS+SAG (CD2-21PB1) 18 February, 2005 -10:26 Page 60f6 -' ConocoPhillips Alaska, Inc. Alaska North Slope North Slope, Alaska CD2-21 PB1 Job No. AKZZ3458623, Surveyed: 14 January, 2005 Survey Report 18 February, 2005 Your Ref: API 501032050470 Surface Coordinates: 5974582.28 N, 371702.51 E (70020'19.6421" N, 151002' 27.8701" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Kelly Bushing Elevation: 53.00ft above Mean Sea Level spe....,....,y-sul'1 r:..~I.b..ï;...·ïN..I:!;......··$·~·..~y..i.c;...··$ A Halliburton Company ConocoPhillipsJJ laska, Inc. '"-' Survey Report forfJ:r1621 PB1 Your Ref: API 501· 050470 Job No. AKZZ3458623, Surveyed: 14 January, 2005 Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 0.00 0.000 0.000 -53.00 0.00 0.00 N 0.00 E 5974582.28 N 371702.51 E 85.00 0.250 83.000 32.00 85.00 0.02 N 0.18 E 5974582.30 N 371702.69 E 0.294 163.00 0.250 158.000 110.00 163.00 0.11 8 0.42 E 5974582.16 N 371702.92 E 0.390 255.00 1.300 254.000 201.99 254.99 0.598 0.51 W 5974581.70 N 371701.99 E 1.467 345.00 3.850 273.000 291.89 344.89 0.718 4.51 W 5974581.65 N 371697.99 E 2.950 434.00 6.500 274.000 380.52 433.52 0.208 12.52 W 5974582.29 N 371689.99 E 2.979 522.00 9.400 270.000 467.67 520.67 0.14 N 24.68 W 5974582.85 N 371677.84 E 3.353 613.00 11.500 269.000 557.15 610.15 0.018 41.18 W 5974582.97 N 371661.33 E 2.316 701.00 12.200 270.000 643.28 696.28 0.178 59.25 W 5974583.13 N 371643.26 E 0.829 793.00 13.200 267.000 733.03 786.03 0.728 79.46 W 5974582.92 N 371623.05 E 1.302 927.19 14.470 268.300 863.32 916.32 2.028 111.52 W 5974582.17 N 371590.97 E 0.974 1025.08 15.380 268.200 957.91 1010.91 2.798 136.72 W 5974581.83 N 371565.76 E 0.930 1120.81 18.160 273.920 1049.57 1102.57 2.178 164.30 W 5974582.93 N 371538.20 E 3.374 1216.32 20.710 279.420 1139.63 1192.63 1.62 N 195.82 W 5974587.25 N 371506.75 E 3.284 1311.92 24.100 279.870 1228.00 1281.00 7.73 N 231.73 W 5974593.97 N 371470.94 E 3.551 1407.21 27.910 281.700 1313.63 1366.63 15.59 N 272.76 W 5974602.54 N 371430.06 E 4.086 1502.55 31.780 285.730 1396.32 1449.32 26.93 N 318.79 W 5974614.66 N 371384.22 E 4.570 1597.82 36.630 290.340 1475.10 1528.10 43.62 N 369.63 W 5974632.22 N 371333.68 E 5.769 1693.10 41.580 291.370 1549.02 1602.02 65.04 N 425.76 W 5974654.59 N 371277.93 E 5.240 1788.27 45.560 291.330 1617.96 1670.96 88.91 N 486.84 W 5974679.51 N 371217.26 E 4.182 1881.69 47.820 295.660 1682.05 1735.05 116.04 N 549.13 W 5974707.70 N 371155.44 E 4.150 1978.29 49.740 298.510 1745.71 1798.71 149.14 N 613.80 W 5974741.90 N 371091.36 E 2.979 2072.97 53.040 301.450 1804.79 1857.79 186.13 N 677.84 W 5974779.99 N 371027.96 E 4.246 2168.71 56.240 302.750 1860.19 1913.19 227.63 N 743.96 W 5974822.61 N 370962.55 E 3.521 2263.01 59.480 302.390 1910.35 1963.35 270.61 N 811.24 W 5974866.73 N 370896.01 E 3.451 2358.49 59.860 302.540 1958.56 2011.56 314.85 N 880.78 W 5974912.15 N 370827.25 E 0.420 2453.90 60.210 303.020 2006.22 2059.22 359.60 N 950.27 W 5974958.08 N 370758.53 E 0.570 2548.74 59.700 303.580 2053.70 2106.70 404.67 N 1018.89 W 5975004.32 N 370690.70 E 0.742 2644.32 60.420 303.140 2101.41 2154.41 450.21 N 1088.06 W 5975051.04 N 370622.31 E 0.852 2738.63 61.610 300.550 2147.11 2200.11 493.73 N 1158.14 W 5975095.75 N 370552.99 E 2.713 2834.36 62.110 301.140 2192.26 2245.26 537.01 N 1230.61 W 5975140.26 N 370481.27 E 0.754 2929.27 61 .800 300.220 2236.89 2289.89 579.75 N 1302.65 W 5975184.23 N 370409.97 E 0.916 3025.31 61.770 301.490 2282.29 2335.29 623.15 N 1375.30 W 5975228.87 N 370338.07 E 1.166 3046.20 61.710 301.340 2292.18 2345.18 632.74 N 1391.00 W 5975238.73 N 370322.54 E 0.695 3104.27 60.710 301.800 2320.15 2373.15 659.38 N 1434.36 W 5975266.11 N 370279.64 E 1.857 18 February, 2005 -10:24 Page 20f9 ConocoPhillips Alaska, Inc. ~ Survey Report for. ,,21 PB1 Your Ref: API 501'1r.r1ó50470 Job No. AKZZ3458623, Surveyed: 14 January, 2005 Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Depth Inct. Azim. Depth Depth Northings Eastings Northings Eastings Rate (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 3199.21 59.920 301.750 2367.17 2420.17 702.82 N 1504.48 W 5975310.73 N 370210.27 E 0.833 3294.01 60.750 301.310 2414.09 2467.09 745.89 N 1574.70 W 5975355.01 N 370140.81 E 0.964 3389.27 60.730 301.530 2460.65 2513.65 789.22 N 1645.62 W 5975399.54 N 370070.64 E 0.203 3484.13 60.150 301.200 2507.44 2560.44 832.16 N 1716.07 W 5975443.68 N 370000.93 E 0.682 3579.11 59.300 301.240 2555.33 2608.33 874.68 N 1786.22 W 5975487.39 N 369931.52 E 0.896 3674.52 58.510 302.160 2604.60 2657.60 917.61 N 1855.73 W 5975531.50 N 369862.75 E 1.169 3769.26 58.280 301.570 2654.25 2707.25 960.20 N 1924.26 W 5975575.27 N 369794.97 E 0.583 3864.47 57.760 303.270 2704.68 2757.68 1003.50 N 1992.43 W 5975619.72 N 369727.55 E 1.610 3959.49 58.280 302.810 2755.01 2808.01 1047.44 N 2059.99 W 5975664.81 N 369660.74 E 0.684 4053.55 59.000 303.140 2803.96 2856.96 1091.15 N 2127.37 W 5975709.67 N 369594.12 E 0.822 4149.83 58.780 303.440 2853.70 2906.70 1136.40 N 2196.28 W 5975756.09 N 369526.00 E 0.351 4245.60 59.250 303.290 2903.01 2956.01 1181.55 N 2264.85 W 5975802.41 N 369458.21 E 0.509 4340.84 59.520 302.450 2951.51 3004.51 1226.04 N 2333.69 W 5975848.07 N 369390.14 E 0.810 4436.03 60.520 303.120 2999.08 3052.08 1270.69 N 2403.01 W 5975893.90 N 369321.60 E 1.215 4531.52 60.710 302.970 3045.93 3098.93 1316.06 N 2472.75 W 5975940.45 N 369252.64 E 0.242 4626.75 61.500 302.800 3091.95 3144.95 1361.33 N 2542.77 W 5975986.91 N 369183.41 E 0.844 4721.68 62.960 304.250 3136.18 3189.18 1407.72 N 2612.78 W 5976034.50 N 369114.20 E 2.047 4810.09 62.470 303.980 3176.71 3229.71 1451.79 N 2677.83 W 5976079.67 N 369049.91 E 0.617 4905.44 61.700 302.860 3221.35 3274.35 1498.19 N 2748.15 W 5976127.28 N 368980.39 E 1.315 5000.26 60.560 302.880 3267.13 3320.13 1543.26 N 2817.89 W 5976173.53 N 368911.43 E 1.202 5095.12 59.530 302.870 3314.49 3367.49 1587.87 N 2886.92 W 5976219.32 N 368843.18 E 1.086 5190.66 58.500 301.170 3363.68 3416.68 1631.30 N 2956.36 W 5976263.93 N 368774.50 E 1.868 5285.16 58.310 300.360 3413.19 3466.19 1672.48 N 3025.52 W 5976306.28 N 368706.05 E 0.757 5381.13 58.310 300.820 3463.60 3516.60 1714.03 N 3095.82 W 5976349.03 N 368636.47 E 0.408 5476.15 57.920 299.750 3513.80 3566.80 1754.72 N 3165.49 W 5976390.91 N 368567.51 E 1.041 5571.67 58.860 299.470 3563.86 3616.86 1794.91 N 3236.21 W 5976432.30 N 368497.49 E 1.015 5667.19 60.310 300.990 3612.22 3665.22 1836.39 N 3307.37 W 5976474.99 N 368427.04 E 2.046 5762.57 60.920 300.360 3659.02 3712.02 1878.79 N 3378.85 W 5976518.61 N 368356.30 E 0.860 5857.40 61.350 299.980 3704.80 3757.80 1920.52 N 3450.65 W 5976561.57 N 368285.22 E 0.573 5952.86 61.450 300.400 3750.49 3803.49 1962.67 N 3523.10 W 5976604.95 N 368213.51 E 0.400 6048.23 61.080 300.450 3796.34 3849.34 2005.02 N 3595.20 W 5976648.52 N 368142.14 E 0.391 6143.57 59.920 300.580 3843.29 3896.29 2047.15 N 3666.69 W 5976691.87 N 368071.38 E 1.222 6238.85 59.660 299.580 3891.23 3944.23 2088.42 N 3737.94 W 5976734.35 N 368000.85 E 0.947 6333.94 59.240 299.200 3939.57 3992.57 2128.61 N 3809.29 W 5976775.76 N 367930.20 E 0.560 6428.70 59.080 299.190 3988.15 4041.15 2168.30 N 3880.31 W 5976816.65 N 367859.86 E 0.169 18 February, 2005 -10:24 Page 30f9 6 O t aBed tz:o . - gOOZ 'A.¡en.lqa::J S ' omro 3 ££'6ZV99£ N mrBL9BL69 M 99'017£9 N 09'BBB£ L9'00v9 L9'Lv£9 OV~'9~£ 09L'LL 9£'09L6 099'~ 3 ZV'£6V99£ N 69'0 ~9BL69 M Ov'9LZ9 N 09' ~ZB£ Z ~ 'OB£9 Z~'LZ£9 OB£'9 ~£ OL9' LL ~9'v996 9179'0 3 9~ 'L9999£ N vB'ZvvBL69 M ~9'0~Z9 N 9B'v9L£ £9'09£9 £9' LO£9 OVZ'9 ~£ OBL'BL 09'6996 ~99'Z 3 £0' ~Z999£ N 179'17 L£BL69 M Bv'9v~9 N v9'LB9£ £6' ~v£9 £6'BBZ9 0179'9 ~£ 009'BL £~'vLv6 B6£'~ 3 9Z'9B999£ N 6Z'BO£BL69 M £~·6L09 N £9'ZZ9£ ~£·ZZ£9 ~£'69Z9 OBZ'£ ~£ OL9'LL ~ ~ '6L£6 L90'~ 30L'£9L99£ N ~ ~ 'vvZBL69 M 09'0~09 N ~9'699£ B9' ~0£9 B9'BvZ9 OZ6' ~ ~£ 0917' LL 9L'£BZ6 ~6Z'Z 3 vB' ~ZB99£ N Z9'~B~BL69 M 6£'~v69 N OZ'B6v£ ~9'OBZ9 ~ 9' LZZ9 09 ~ . ~ ~ £ 09L'9L 06'BB~6 9U'V 3 OB'06B99£ N Zv'OZ~BL69 M 017' ~LB9 N B~'B£v£ OZ'L9Z9 OZ'vOZ9 090'O~£ 09B'vL 6L'£606 9~£'~ 3 170'09699£ N 9L' ~90BL69 M9~'~OB9 N ZL'OB££ v9'6ZZ9 v9'9L ~9 009'BO£ OvZ' ~L 06'B66B 9L9'~ 3 0 ~ '0£099£ N 6L'vOOBL69 M v~ '0£L9 N 96'VZ££ £6'L6 ~9 £6'vv~9 OBL'LO£ OB~'OL £Z'£06B 9~L'Z 3 170'00 ~99£ N 69'6v6LL69 M LZ'6999 N 96'OLZ£ 99'179 ~9 99' ~ ~ ~9 0~B'90£ OLB'B9 Z ~ 'BOBB v69'Z 3 ~9'69 ~99£ N v ~ '96BLL69 M LB'BB99 N OL'L~Z£ 6Z'BZ~9 6Z'9L09 OZV'LO£ 017£'99 V9'Z ~LB £LB'£ 3 B9' L£Z99£ N 9 ~ 'ZvBLL69 M ~B'6~99 N BB'99~£ ~v'BB09 ~ 17'9£09 0££'90£ OBO'v9 £9'L~9B ~6v'0 3 ~B'90£99£ N L9'Z6LLL69 M vB'6vv9 N 09'L~ ~£ ~Z'9V09 ~Z'Z66V 09B'ZO£ 090'Z9 9 ~ 'ZZ9B 9617'0 3vL'9L£99£ N VZ'9V LLL69 M £~'6L£9 N L£'ZLO£ 9L'0009 9L·Lv6v OV£'ZO£ OV~'Z9 H'LZvB Z£9'0 3 ZZ'L 171799£ N L£'OOLLL69 M LB'LO£9 N ZL'LZO£ 9Z'996V 9Z'£06v o ~B' ~O£ OBO'Z9 £O'Z££B Z69'0 396'9Z999£ N 9L'6v9LL69 M 6Z'LZZ9 N Lv'BL6Z £ ~ '90617 £ ~ '£9Bv 090' ~O£ 000'Z9 ~ ~ '9ZZB vLL'O 399'6B999£ N 9~'0~9LL69 M ZO'V9 ~9 N V6'6£6Z 96'99Bv 96'£~Bv 0£9' ~O£ OLZ'Z9 ~£' ~v~B v99'~ 3 ZO'09999£ N 9£'v99LL69 M BL'Z609 N 9£'96BZ L9'ZZBv L9'69Lv 09v'ZO£ 09 ~ 'Z9 ~£'9vOB 009'0 3 ~£'0£L99£ N 66'9 ~9LL69 M 69' ~Z09 N OZ'6vBZ 90'6LLv 90'9ZLv 0£9'£0£ 0017'£9 66'096L LZZ'O 3 9 ~ '00B99£ N v9'B9v LL69 M £0' ~96v N 90'ZOBZ vB'9£Lv v8'£B9v 006'£0£ 017 L '£9 £~'998L L6~'O 3 L£'OLB99£ N 9B'6~vLL69 M B6'6LBv N 6v'V9LZ LL'v69v LL' ~ 17917 OOL'£O£ 09B'£9 vB'09LL OOB·O 3 ~£'OV699£ N ££' ~L£LL69 M ZZ'608V N 9~'LOLZ LB'Z99v L8'669v 098'£0£ 0£L'£9 96'999L £BZ'O 3 96'0 ~OL9£ N 96'ZZ£LL69 M 9L'L£Lv N 66'699Z 8v'0~9v Bv' L99v O~O'£O£ 009'£9 Zv'OL9L ~£~ '~ 3 17£' ~BOL9£ N ZZ'9LZLL69 M L9'999v N 8V'£~9Z BZ'B99v BZ'9~9v O~£'£O£ 0~9'£9 Bv'9LvL £L9'~ 3 09' ~9 ~L9£ N 0 ~ 'BZZLL69 M Z9'969V N 99' L99Z Z9'9Z9v Z9'ZLvv 009'ZO£ OZ~rZ9 ~8'08£L 690'Z 3 LZ'ZZZL9£ N 60'ZB~LL69 M LO'vZ9v N LL'ZZ9Z 86'081717 86' LZvv 069' ~O£ 01717' ~9 Z£'98ZL ZV£'~ 3 v6'Z6ZL9£ N 9Z'B£~LL69 M 99'Z9VV N 9~'OBvZ 17£'17£1717 17£' ~ B£v 090'00£ 000'09 96'6B ~L ~9Z'~ 3 £9'£9£L9£ N B9'960LL69 M LZ'~8£v N 08'6£VZ VZ·98£V VZ'£££V 068'B6Z OZZ'69 6B'v60L BO£'O 3 L£'9£v L9£ N 66'990LL69 M v8'LO£v N 9£'00VZ ~ ~ '9££17 ~ ~ '£BZv 069'L6Z 0£L'B9 £9' L669 LL9'0 3 B£' L09L9£ N 09'L ~OLL69 M B~'9£Zv N B~'£9£Z 60' L8Zv 60'V£ZV 09Z'L6Z 0£L'B9 B ~ '£069 0176'0 3 6£' LL9L9£ N £v'6L69L69 M £9'99~v N ZZ'9Z£Z L9'8£Zv L9'98 ~ v 086'L6Z 0£9'89 v9'6089 ~£17'O 3 LZ'9179L9£ N 9£'6£69L69 M L6'£60v N 9£' LBZZ 176'B9~v 176'9£~17 0£O'66Z 099'99 gv'17~L9 HB'O 3 £9'B ~LL9£ N B£'B6B9L69 M £O'£Z017 N 09'L17ZZ L£'6£ ~ 17 L£'9B017 o ~9'66Z 0£9'99 17Z'6~99 LL£'O 3 ~6'99LL9£ N 99' L9B9L69 M 96' ~96£ N L6' LOZZ OZ'060V OZ'L£017 OLL 'B6Z 080'69 9 ~ 'vZ99 (UOO ~/o) (U) (U) (U) (U) (U) (U) (U) a¡e~ s6u ¡Se3 s6u!4¡JON s6u ¡Se3 s6u!4¡JON 4¡daa 4¡daa ·W!ZV l:>UI 4¡daa 6al6oa sa¡eu!pJoo:) leqolÐ sa¡eu!pJoo:) le:>ol le:>!¡Ja^ eas-qns anJ.l paJnseaw adolS l./µoN e)fsel'rl gOOZ 'JÚenuer t/. :pa,{aILInS '£Z9Sgt£ZZ>I'rI ·oN qor OLVO~O/.Og Id'rl : aH .InoÁ .~ /.8d /.1 ? .IO µodaH ,{aA-InS -:Ju leJ se, fI Sd! !L/dO:JOUO~ ConocoPhillips Alaska, Inc. ~ Survey Report for, . .~21 PB1 Your Ref: AP/501'ð':r1ó50470 Job No. AKZZ3458623, Surveyed: 14 January, 2005 Alaska North Slope Measured True Sub-5ea Vertical Local Coordinates Global Coordinates Dogleg Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 9855.68 77.190 315.410 5368.25 5421.25 3955.29 N 6405.55 W 5978646.59 N 365365.57 E 0.957 9950.55 77.130 314.580 5389.33 5442.33 4020.69 N 6470.96 W 5978713.10 N 365301.29 E 0.855 10042.85 77.330 313.310 5409.73 5462.73 4083.16 N 6535.78 W 5978776.67 N 365237.55 E 1.359 10141.31 77.260 312.540 5431.39 5484.39 4148.57 N 6606.11 W 5978843.27 N 365168.35 E 0.766 10236.55 77.070 312.310 5452.54 5505.54 4211.22 N 6674.65 W 5978907.08 N 365100.89 E 0.309 10331.67 77.260 313.040 5473.67 5526.67 4274.08 N 6742.84 W 5978971.11 N 365033.79 E 0.774 10426.83 77.260 313.740 5494.66 5547.66 4337.84 N 6810.29 W 5979036.01 N 364967.44 E 0.717 10521.78 77.700 313.950 5515.24 5568.24 4402.05 N 6877.14 W 5979101.36 N 364901.70 E 0.511 10616.15 77.630 313.900 5535.40 5588.40 4466.01 N 6943.54 W 5979166.44 N 364836.40 E 0.090 10712.09 77.580 314.590 5556.00 5609.00 4531.38 N 7010.66 W 5979232.96 N 364770.40 E 0.704 10807.36 77.580 315.120 5576.49 5629.49 4597.01 N 7076.62 W 5979299.70 N 364705.58 E 0.543 10902.37 77.510 315.620 5596.98 5649.98 4663.03 N 7141.80W 5979366.83 N 364641.54 E 0.519 10997.99 77.510 314.990 5617.66 5670.66 4729.39 N 7207.46 W 5979434.30 N 364577.03 E 0.643 11092.64 77.640 315.450 5638.02 5691.02 4795.00 N 7272.57 W 5979501.02 N 364513.05 E 0.494 11187.82 77.570 314.940 5658.45 5711.45 4860.96 N 7338.07 W 5979568.09 N 364448.68 E 0.528 11281.50 77.640 313.640 5678.56 5731.56 4924.85 N 7403.57 W 5979633.09 N 364384.29 E 1.357 11377.54 77.500 313.350 5699.24 5752.24 4989.40 N 7471.61 W 5979698.80 N 364317.37 E 0.329 11472.86 76.930 313.350 5720.33 5773.33 5053.21 N 7539.20 W 5979763.75 N 364250.87 E 0.598 11568.30 77.000 313.750 5741.86 5794.86 5117.28 N 7606.59 W 5979828.96 N 364184.59 E 0.415 11663.36 77.760 315.450 5762.63 5815.63 5182.41 N 7672.64 W 5979895.21 N 364119.67 E 1.920 11758.14 77.830 315.670 5782.66 5835.66 5248.55 N 7737.50 W 5979962.45 N 364055.95 E 0.239 11853.30 77.320 315.130 5803.14 5856.14 5314.72 N 7802.75 W 5980029.73 N 363991.84 E 0.771 11948.30 77.320 315.530 5823.99 5876.99 5380.63 N 7867.91 W 5980096.75 N 363927.82 E 0.411 12043.64 78.710 314.630 5843.79 5896.79 5446.67 N 7933.76 W 5980163.90 N 363863.11 E 1.726 12138.77 78.640 315.500 5862.47 5915.47 5512.70 N 7999.64 W 5980231.05 N 363798.36 E 0.900 12234.12 77.690 314.600 5882.03 5935.03 5578.75 N 8065.57 W 5980298.21 N 363733.57 E 1.359 12329.00 77.570 315.380 5902.35 5955.35 5644.27 N 8131.11 W 5980364.85 N 363669.16 E 0.813 12424.10 77.950 315.130 5922.51 5975.51 5710.28 N 8196.54 W 5980431.96 N 363604.88 E 0.475 12519.53 77.820 313.690 5942.54 5995.54 5775.57 N 8263.19 W 5980498.39 N 363539.35 E 1.482 12614.53 77.750 312.430 5962.64 6015.64 5838.96 N 8331.03 W 5980562.93 N 363472.61 E 1.298 12710.09 77.570 313.250 5983.07 6036.07 5902.43 N 8399.48 W 5980627.57 N 363405.26 E 0.859 12805.13 77.120 312.770 6003.89 6056.89 5965.69 N 8467.28 W 5980691.97 N 363338.54 E 0.683 12900.48 77.070 313.240 6025.18 6078.18 6029.08 N 8535.25 W 5980756.52 N 363271.67 E 0.483 12995.42 77.830 314.040 6045.81 6098.81 6093.04 N 8602.32 W 5980821.61 N 363205.71 E 1.148 13090.87 77.690 314.610 6066.05 6119.05 6158.21 N 8669.05 W 5980887.92 N 363140.10 E 0.602 18 February, 2005 -10:24 Page 50f9 ConocoPhillips jJ 'aska, Inc. Survey Report for G )1 PB1 Your Ref: API 5010~0470 Job No. AKZZ3458623, Surveyed: 14 January, 2005 Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 13186.07 78.510 315.620 6085.68 6138.68 6224.21 N 8734.78 W 5980955.04 N 363075.50 E 1.349 13280.30 78.320 316.720 6104.61 6157.61 6290.80 N 8798.71 W 5981022.71 N 363012.73 E 1.161 13375.25 78.070 316.870 6124.03 6177.03 6358.55 N 8862.34 W 5981091.54 N 362950.27 E 0.305 13470.12 78.270 314.930 6143.48 6196.48 6425.23 N 8926.95 W 5981159.31 N 362886.80 E 2.013 13565.39 77.810 314.580 6163.22 6216.22 6490.85 N 8993.14 W 5981226.05 N 362821.75 E 0.602 13660.40 77.450 315.630 6183.58 6236.58 6556.59 N 9058.64 W 5981292.91 N 362757.38 E 1.144 13754.70 77.190 315.200 6204.28 6257.28 6622.11 N 9123.22 W 5981359.52 N 362693.93 E 0.523 13850.97 77.450 313.160 6225.41 6278.41 6687.57 N 9190.57 W 5981426.12 N 362627.71 E 2.085 13946.15 77.960 313.180 6245.68 6298.68 6751.19N 9258.40 W 5981490.90 N 362560.98 E 0.536 14040.94 77.570 313.760 6265.77 6318.77 6814.92 N 9325.63 W 5981555.77 N 362494.85 E 0.726 14136.89 77.180 314.060 6286.74 6339.74 6879.86 N 9393.08 W 5981621.85 N 362428.52 E 0.508 14232.03 78.070 312.870 6307.13 6360.13 6943.78 N 9460.53 W 5981686.92 N 362362.18 E 1.539 14327.03 78.650 313.340 6326.30 6379.30 7007.36 N 9528.46 W 5981751.65 N 362295.34 E 0.779 14422.30 78.010 314.440 6345.57 6398.57 7072.04 N 9595.70 W 5981817.47 N 362229.22 E 1.315 14518.02 77.440 314.800 6365.92 6418.92 7137.74 N 9662.27 W 5981884.30 N 362163.78 E 0.700 14613.10 77.500 315.150 6386.55 6439.55 7203.34 N 9727.93 W 5981951.01 N 362099.25 E 0.365 14708.43 77.120 315.270 6407.49 6460.49 7269.34 N 9793.45 W 5982018.13 N 362034.87 E 0.417 14803.51 77.520 314.680 6428.36 6481.36 7334.91 N 9859.07 W 5982084.80 N 361970.38 E 0.737 14899.05 77.510 315.170 6449.01 6502.01 7400.78 N 9925.12 W 5982151.80 N 361905.47 E 0.501 14994.50 76.860 314.930 6470.18 6523.18 7466.65 N 9990.87 W 5982218.78 N 361840.86 E 0.724 15090.04 78.270 314.400 6490.76 6543.76 7532.23 N 10057.23 W 5982285.49 N 361775.63 E 1.572 15185.35 77.570 315.170 6510.70 6563.70 7597.88 N 10123.38 W 5982352.26 N 361710.62 E 1.079 15280.52 78.140 315.070 6530.72 6583.72 7663.81 N 10189.03 W 5982419.30 N 361646.10 E 0.608 15375.68 77.560 316.070 6550.75 6603.75 7730.24 N 10254.15 W 5982486.84 N 361582.13 E 1.195 15470.79 77.760 315.340 6571.08 6624.08 7796.74 N 10319.04 W 5982554.44 N 361518.39 E 0.779 15566.24 77.830 316.110 6591.26 6644.26 7863.54 N 10384.16 W 5982622.34 N 361454.41 E 0.792 15661.08 77.580 314.380 6611.46 6664.46 7929.34 N 10449.40 W 5982689.25 N 361390.31 E 1.802 15756.40 77.820 314.750 6631.76 6684.76 7994.69 N 10515.75 W 5982755.73 N 361325.09 E 0.455 15850.83 77.180 313.450 6652.20 6705.20 8058.85 N 10581.96 W 5982821.01 N 361259.99 E 1.505 15943.70 78.170 312.910 6672.03 6725.03 8120.93 N 10648.12 W 5982884.22 N 361194.90 E 1.208 16040.39 77.380 313.620 6692.50 6745.50 8185.70 N 10716.93 W 5982950.15 N 361127.21 E 1.087 16137.20 77.640 313.340 6713.44 6766.44 8250.74 N 10785.51 W 5983016.35 N 361059.75 E 0.390 16232.17 77.190 313.160 6734.13 6787.13 8314.24 N 10853.02 W 5983081.00 N 360993.33 E 0.509 16326.4 7 77.070 312.890 6755.13 6808.13 8376.97 N 10920.23 W 5983144.87 N 360927.21 E 0.307 16422.63 78.590 313.530 6775.41 6828.41 8441.33 N 10988.74 W 5983210.39 N 360859.81 E 1.709 18 February, 2005 - 10:24 Page 60f9 ConocoPhillips Ii laska, Inc. ~ Survey Report for, i21PB1 Your Ref: API S01ò:r1ÓS0470 Job No. AKZZ34S8623, Surveyed: 14 January, 200S Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 o Oft) 16518.03 77.700 313.560 6795.00 6848.00 8505.65 N 11056.41 W 5983275.86 N 360793.25 E 0.933 16613.35 78.140 314.430 6814.95 6867.95 8570.39 N 11123.47 W 5983341.74 N 360727.31 E 1.005 16704.77 77.770 316.030 6834.03 6887.03 8633.86 N 11186.43 W 5983406.28 N 360665.44 E 1.759 16797.66 77.580 316.330 6853.86 6906.86 8699.34 N 11249.26 W 5983472.82 N 360603.74 E 0.376 16890.49 77.450 316.370 6873.93 6926.93 8764.92 N 11311.83 W 5983539.46 N 360542.31 E 0.146 16985.18 77.260 315.410 6894.66 6947.66 8831.26 N 11376.13 W 5983606.89 N 360479.15 E 1.009 17076.92 78.150 314.860 6914.19 6967.19 8894.79 N 11439.37 W 5983671.49 N 360417.01 E 1.133 17170.66 78.460 315.580 6933.19 6986.19 8959.94 N 11504.02 W 5983737.75 N 360353.48 E 0.822 17263.12 78.080 313.740 6951.99 7004.99 9023.57 N 11568.41 W 5983802.4 7 N 360290.19 E 1.991 17357.31 77.440 313.980 6971.96 7024.96 9087.35 N 11634.78 W 5983867.38 N 360224.92 E 0.724 17450.43 76.560 314.290 6992.91 7045.91 9150.54 N 11699.90 W 5983931.66 N 360160.89 E 0.999 17542.89 77.070 314.830 7014.00 7067.00 9213.70 N 11764.04 W 5983995.92 N 360097.84 E 0.792 17635.66 77.770 316.010 7034.20 7087.20 9278.19 N 11827.59 W 5984061.48 N 360035.40 E 1.453 17726.53 77.580 317.230 7053.60 7106.60 9342.71 N 11888.57 W 5984127.04 N 359975.54 E 1.328 17819.35 77.390 316.130 7073.72 7126.72 9408.64 N 11950.73 W 5984194.02 N 359914.51 E 1.175 17912.30 76.940 316.080 7094.36 7147.36 9473.94 N 12013.57 W 5984260.39 N 359852.80 E 0.487 18006.37 77.900 317.130 7114.85 7167.85 9540.66 N 12076.64 W 5984328.17 N 359790.88 E 1.493 18097.47 77.640 316.990 7134.15 7187.15 9605.83 N 12137.29 W 5984394.38 N 359731.35 E 0.323 18189.08 77.130 316.160 7154.16 7207.16 9670.76 N 12198.75 W 5984460.35 N 359671.02 E 1.045 18283.82 76.750 315.830 7175.57 7228.57 9737.14 N 12262.86 W 5984527.82 N 359608.05 E 0.525 18376.93 75.410 315.800 7197.97 7250.97 9801.95 N 12325.85 W 5984593.69 N 359546.18 E 1.439 18469.13 76.570 317.120 7220.29 7273.29 9866.80 N 12387.47 W 5984659.58 N 359485.68 E 1.874 18562.20 76.180 318.570 7242.21 7295.21 9933.85 N 12448.17 W 5984727.66 N 359426.13 E 1.571 18655.31 75.350 318.590 7265.11 7318.11 10001.52 N 12507.88 W 5984796.35 N 359367.59 E 0.892 18747.28 75.730 319.840 7288.07 7341.07 10068.95 N 12566.05 W 5984864.77 N 359310.58 E 1.379 18841.55 75.990 321.010 7311 .10 7364.10 10139.41 N 12624.29 W 5984936.21 N 359253.56 E 1.235 18932.48 75.670 319.950 7333.36 7386.36 10207.42 N 12680.39 W 5985005.17 N 359198.63 E 1.184 19026.25 75.360 319.760 7356.82 7409.82 10276.82 N 12738.92 W 5985075.56 N 359141.29 E 0.384 19119.48 76.440 319.320 7379.53 7432.53 10345.62 N 12797.60 W 5985145.35 N 359083.80 E 1.246 19211.20 75.340 319.600 7401.89 7454.89 10413.22 N 12855.42 W 5985213.93 N 359027.15 E 1.235 19304.81 75.980 319.040 7425.08 7478.08 10481.99 N 12914.53 W 5985283.71 N 358969.22 E 0.896 19398.43 76.130 320.010 7447.64 7500.64 10551.11 N 12973.51 W 5985353.83 N 358911.43 E 1.018 19491.79 75.410 319.940 7470.59 7523.59 10620.41 N 13031.71 W 5985424.11 N 358854.43 E 0.775 19584.01 75.810 320.040 7493.51 7546.51 10688.83 N 13089.14 W 5985493.50 N 358798.17 E 0.446 19677.11 73.410 319.680 7518.21 7571.21 10757.44 N 13147.00 W 5985563.10 N 358741.50 E 2.605 18 February, 2005 - 10:24 Page 70'9 ConocoPhillips Ii laska, Inc. Survey Report for ~21 PB1 Your Ref: API 5010 ·050470 Job No. AKZZ3458623, Surveyed: 14 January, 2005 Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 19770.86 70.240 319.340 7547.45 7600.45 10825.18 N 13204.83 W 5985631.81 N 358684.84 E 3.399 19862.08 66.510 318.620 7581.06 7634.06 10889.15 N 13260.47 W 5985696.72 N 358630.30 E 4.154 19953.95 62.980 319.300 7620.25 7673.25 10951.80 N 13315.02 W 5985760.30 N 358576.83 E 3.900 20047.95 59.460 319.690 7665.50 7718.50 11014.43 N 13368.53 W 5985823.84 N 358524.40 E 3.762 20138.99 55.780 319.560 7714.25 7767.25 11073.00 N 13418.32 W 5985883.25 N 358475.62 E 4.044 20171.00 55.780 319.560 7732.25 7785.25 11093.14 N 13435.49 W 5985903.68 N 358458.79 E 0.000 All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to 53 ft above MSL. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 313.330° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 20171.00ft., The Bottom Hole Displacement is 17423.27ft., in the Direction of 309.545° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 20171.00 7785.25 11093.14 N 13435.49 W Projected Survey 18 February, 2005 -10:24 Page 80f9 ConocoPhillips ji1aska, Inc. Survey Report for t 21 PB1 Your Ref: API 501~50470 Job No. AKZZ3458623, Surveyed: 14 January, 2005 Alaska North Slope Survey tool program for CD2-21PB1 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 793.00 0.00 793.00 786.03 20171.00 786.03 CB-SS-Gyro 7785.25 MWD+IIFR+MS+SAG 18 February, 2005 - 10:24 Page 9 of9 >:hJ l/-2~) ~ WELL LOG TRANS MITT AL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Helen Wannan 333 West ih Avenue, Suite 100 Anchorage, Alaska 99501-3539 March 1, 2005 RE: MWD Fonnatiol1 Evaluation Logs: CD2-2l, AJ(-MW-3l58623 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this translnittalletter to the attention of: Rob Kalish, Spen-y Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 1 LDWG fonnatted Disc with verification listing. API#: 50-103-20504-00. O~¡ JJ~ i~ /0 s' ~ STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Submit to: J1O:LJegg.@.~ädm¡n..$tate.a.k,JJ~ {WgCG _pmg.b.oe _þ;:;y@adr:rÜo.~tate.éÛLY.S ÞQ¡~u.necK~n~te¡n@q.dm¡n .st.~tf.;. ai<. u~ Rig No.: 19 DATE: 1/23/2005 Rig Phone: 670-4302' Rig Fax: 670-4303 Op. Phone: 670-4300 Op. Fax: 670-4301 11 /09/04 Contractor: Doyon Rig Rep.: Krupa/Lupton Operator: Conoco Phillips Alaska Rep.: Burley/Hill Field/Unit & Well No.: Colville Rv CD2-21 Operation: Test Test Pressure: Drlg: X Initial: Rams: 250/5000 MISC. INSPECTIONS: Test Result Location Gen.: P Housekeeping: P PTD On Location P Standing Order Posted P BOP STACK: Quantity 1 1 1 1 1 2 1 o Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve MUD SYSTEM: Visual Test Trip Tank P Pit Level Indicators P Flow Indicator P Meth Gas Detector P H2S Gas Detector P Well Sign Drl. Rig Hazard Sec. Size 13-5/8 3-1/2x 6 3-1/2x 6 blinds 3-1/8 3-1/8 3-1/8 Alarm Test P P P P P \.~d PTD # 204-245 Workover: Weekly: Annular: 250/3500 TEST DATA Explor. : Bi-Weekly x Valves: 250/5000 Test Result P P P Test Result P P P P P P P NA FLOOR SAFETY VALVES: Quantity Test Result Upper Kelly 1 P Lower Kelly 1 P Ball Type 1 P Inside BOP 1 P CHOKE MANIFOLD: Quantity Test Result No. Valves 16 P Manual Chokes 1 P Hydraulic Chokes 1 P ACCUMULATOR SYSTEM: Time/Pressure Test Result System Pressure 3000 P Pressure After Closure 1475 P 200 psi Attained 28 sec P Full Pressure Attained 2 min 47 sec P Blind Switch Covers: All stations P Nitgn. Bottles (avg): 4 @2350 Test Results Number of Failures: º Test Time: 4.75 Hours Components tested 28 Repair or replacement of equipment will be made within n/a days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Superviser at JIm reg.g.@adm¡îl...$tat¡;;.{i.k,.~J~ Remarks: Test went well- 24 HOUR NOTICE GIVEN YES X NO Date 01/21/05 Time Waived By 8:00:00PM John Crisp Witness Test start 1:00PM 1-22-( Finish 23/052:00: AM Robert Lupton BOP Test (for rigs) BFL 11/09/04 Doyon19 01-23-05 CD2-21.xls Ke: ~UL.-L.l r D 1 ~L.V't-'¿''¿'J} r IU/:,/:,IU/:, VP!;;1 auvu;:> d4~ Subject: Re: CD2-21PB 1 (204~ Plugging operations From: Thomas Maunder <tom _ maunder@admin.state.ak.us> Date: Fri, 14 Jan 2005 14:33:13 -0900 To: "Johnson, Vem" <Vem.Johnson@conocophillips.com> CC: "Alvord, Chip" <Chip.Alvord@conocophillips.com>, Doyon 19 Company Man <doyon 1 @conocophillips.com> ':~ Vern, et aI, The approval as given previously is still valid regarding not tagging the lower plugs. The exception to tagging is null if unusual circumstance (most likely lost circulation, but riot limited to that) are encountered while setting the plug(s). Using viscosified mud in between the plugs is acceptable and should preclude the cement from moving. Good luck with the operation. Tom Maunder, PE AOGCC Johnson, Vem wrote: Tom, As discussed this afternoon, we are preparing to plug back the. pilot hole portion of CD2-21 PB1. Our current plan is slightly different from the plan described in the permit to drill application. We currently plan to place three cement plugs vs. two. The first from TO (20172' MD) to 100' + above the top of the Nechelik sand, the second will be placed 100'+ below the base of the Alpine and 100' + above the top of the Alpine. There will be mud and a hi-vis pill between the first and second plug. A third plug will be set +/- 200 ft above and below the planned kick off depth at +/- 8500' MD. This plug will have mud and a hi-vis pill below it. This is the plug that will be tagged and used to kick off and drill the intermediate section to landing in the Alpine sands. As described in the permit to drill application, we do not plan to tag lower plug(s). Let me know if you have any questions or concerns. Vern Johnson 907 -7 48-3906 1 of 1 1/14/20052:42 PM STATE OF ALASKA ...~. OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Submit to: Hm.__.ß1.Qg@admL~L$.tªte.ak.u~ a.ogcG___p;ud.h.º~_ bay@adm; n ..~tf;l.t~__ ª.K..u$. Qüb f;eck~n~t~to.@adm¡n.staJ~,.<tk,.~l~ Rig No.: 19 DATE: 1/10/2005 Rig Phone: 670-4302 Rig Fax: 670-4303 Op. Phone: 670-4300 Op. Fax: 670-4301 '~ 11 /09/04 Contractor: Doyon Rig Rep.: Grazulis/Welsh Operator: Conoco Phillips Alaska Rep.: Lutrick/Mickey Field/Unit & Well No.: Colville Rv CD2-21 Operation: Test: Test Pressure: MISC. INSPECTIONS: Test Result Location Gen.: P Housekeeping: P PTD On Location P Standing Order Posted P BOP STACK: Quantity 1 1 1 1 1 2 1 o Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve MUD SYSTEM: Visual Test Trip Tank P Pit Level Indicators P Flow Indicator P Meth Gas Detector P H2S Gas Detector P Well Sign Dr!. Rig Hazard Sec. Size 13-5/8 3-1/2x 6 3-1/2x 6 blinds 3-1/8 3-1 /8 3-1 /8 Alarm Test P P P P P PTD # 204-245 .--- EXPIOr.:"\ t£1iI( Bi-Weekly ~ Workover: VV'eekly: Annular: 250/3500 TEST DATA Test Result P P P Test Result P P P P P P P NA Valves: 250/5000 FLOOR SAFETY VALVES: Quantity Test Result Upper Kelly 1 P Lower Kelly 1 P Ball Type 1 P Inside BOP 1 P CHOKE MANIFOLD: Quantity Test Result No. Valves 16 P Manual Chokes 1 P Hydraulic Chokes 1 P ACCUMULATOR SYSTEM: Time/Pressure Test Result System Pressure 3000 P Pressure After Closure 1475 P 200 psi Attained 35 sec P Full Pressure Attained 2 min 55 sec P Blind Switch Covers: All stations P Nitgn. Bottles (avg): 4 @1650 Test Results Number of Failures: º Test Time: 5.5 Hours Components tested 28 Repair or replacement of equipment will be made within n/a days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Superviser at: Hm.__ß1.Qg@ad.mÜ:L$.tate.ak,us Remarks: Test went well-cold weather conditions-equipment freezinq-took extra precautions in keepinq equipment thawed out. 24 HOUR NOTICE GIVEN YES X NO Date 01/09/05 Time Waived By John Spaulding 9:00 Witness John Welsh / Ed Grazulis Test start :00 AM 01-10 Finish 1/2005 5:30: AM BOP Test (for rigs) BFL 11/09/04 Doyon19 01-10-05 CD2-21.xls ;~~ STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Submit to: 1im regg@admín.state.ak.us .a.9g.Gç___p'rHç!_b.p_~ _.~ Pf1y@ad=J'!;n.s.tate.ak:us þQþ. _ft~_çK.~.o:$.t?Ül@_ª_gmín.state.ak.us Rig No.: 19 DATE: 12/30/2004 Rig Phone: 670-4302 Rig Fax: 670-4303 Op. Phone: 670-4300 Op. Fax: 670-4301 11/09/04 Contractor: Doyon Rig Rep.: Grazulis/Krupa Operator: Conoco Phillips Alaska Rep.: LutricklHill Field/Unit & Well No.: Colville Rv CD2-21 Operation: Test: Test Pressure: Drlg: X Initial: X Rams: 250/5000 Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln~ Valves HCR Valves Kill Line Valves Check Valve MUD SYSTEM: Visual Test Trip Tank P Pit Level Indicators P Flow Indicator P Meth Gas Detector P H2S Gas Detector P Well Sign Dr!. Rig Hazard Sec. Size 13-5/8 3-1/2x 6 . 3-1/2x 6 blinds 3-1/8 3-1/8 3-1/8 Alarm Test P P P P P PTD # 204-245 Workover: Weekly: Annular: 250/3500 TEST DATA Test Result P P P Test Result P P P P P P P NA Explor. : Bi-Weekly Valves: 250/5000 FLOOR SAFETY VALVES: Quantity Test Result Upper Kelly 1 P Lower Kelly 1 P Ball Type 1 P Inside BOP 1 P CHOKE MANIFOLD: Quantity Test Result No. Valves 16P Manual Chokes 1 P Hydraulic Chokes 1 P ACCUMULATOR SYSTEM: Time/Pressure Test Result System Pressure 3000 P Pressure After Closure 1475 P 200 psi Attained 28 sec P Full Pressure Attained 2 min 47 sec P Blind Switch Covers: All stations P Nitgn. Bottles (avg): 4 @1750 Test Results Number of Failures: Q Test Time: 3.5 Hours Components tested 28 Repair or replacement of equipment will be made within n/a days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Superviser at:B.m__JJ~!_g.g_@_ª_g_mLO_._$ta1!;L_?k.us Remarks: Test went well-cold weather conditions-equipment freezinq-took extra precautions in keepinq equipment thawed out. MISC. INSPECTIONS: Test Result Location Gen.: P Housekeeping: P PTD On Location P Standing Order Posted P BOP STACK: Quantity 1 1 1 1 1 2 1 o 24 HOUR NOTICE GIVEN YES X NO Date 12/29/04 Time Waived By John Crisp noon Test start 5:00pm12/3C Finish 8:30pm12/30 Witness Tim Krupa / Ed Grazulis BOP Test (for rigs) BFL 11/09/04 Doyon19 12-30-04 CD2-21.xls @CO?í'=-ç cY) __ JL ~ .b ~'[ ~~ ff)~ ~ J Lf\j ~ Ll'J " FRANK H. MURKOWSK/. GOVERNOR A.I~A.SIi& OIL AIVD GAS CONSERVATION COMMISSION 333 W. ]TH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 C. Alvord Alpine Drilling Team Leader ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 Re: Colville River CD2-21 ConocoPhillips Alaska, Inc. Permit No: 204-245 Surface Location: 1775' FNL, 1538' FEL, SEC. 2, T11N, R4E, UM Bottomhole Location: 793' FNL, 2067' FWL, SEC. 28, T12N, R4E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name CD2-21PH and API number 50-103-20504-70 from records, data and logs acquired for well Colville River CD2-21. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to .. es... any required test. Contact the Commission's petroleum field inspector at (907) 659-3 . (paget). ( 71,., '. ~ DATED this /.3day of December, 2004 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ¡; ()/ ....o'i I~û RECEIVED DEC 0 9 2004 , --.... ~ STATE OF ALASKA ALASKA OIL & GAS COMMISSION PERMIT TO DRILL ExploratoryU Develo*~iI & GI. C\mMpl~~~sian Service 0 Development Gas 0 AnChOr8ltJ1e Zone Q 5. Bond: U Blanket U Single Well 11. Well Name and Number: Bond No. 59-52-180 CD2-21 6. Proposed Depth: 12. Field/Pool(s): MD: 20244" TVD: 7230'" Colville River Field RedrillU DrillQ Re-entry 0 1a. Type of Work: 1 b. Current Well Class: Stratigraphic Test 0 2. Operator Name: ConocoPhillips Alaska, Inc. 3. Address: P.O. Box 100360 Anchorage, AI< 99510-0360 4a. Location of Well (Govemmental Section): Surface: 1775' FNL, 1538' FEL, Sec. 2, T11N, R4E, UM Top of Productive Horizon: 7. Property Designation: " ALK 380075,387212 8. land Use Permit: Alpine River Pool 13. Approximate Spud Date: 12/24/2004 1738' FNL, 173' FWL, Sec. 34, T12N, R4E, UM Total Depth: 793' FNL, 2067' FWL, Sec. 28, T12N, R4E, UM 4 4b. Location of Well (State Base Plane Coordinates): ASRCNPRA 02 9. Acres in Property: 2560 14. Distance to Nearest Property: 173' FWL, Sec. 34 10. KB Elevation 15. Distance to Nearest Surface: x- 371702.51 16. Deviated wells: Kickoff depth: 200 18. Casing Program Size 5974582.3 Zone- 4 (Height above GL): 0 feet Well 'NÍthin Pool: CD2-24 , 595' 17. Anticipated Pressure (see 20 MC 25.035) y- Maximum Hole Angle: Max. Dooohole Pressure: 3272 psig / Max. Surface Pressure: 2549 psig Setting Depth Quantity of Cement c. f. or sacks (including stage data) ft. 90° Top Bottom MD TVD MD TVD 37' 37' 114' 114' 37' 37' 3124' 2390' 37' 37' 13339' 7228' 32' 32' 12552' 7028' Specifications Grade Coupling H-40 Weld J-55 BTC L-80 BTG-M L-80 EUE-M Hole 42" Casing 16" Weight 62.5# 36# 26# 9.3# Length 77' 3087' 13302' 12520' 12.25" 9.625" 582 sx AS Lite & 230 sx LiteCrete 208 sx 15.8 ppg G 8.5" 7" 6.125" 3.5" Uncemented (To be completed for Redrill and Re-Entry Operations) Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured) PRESENT WELL CONDITION SUMMARY Total Depth TVD (ft): Plugs (measured) 19 Total Depth MD (ft): Casing Structural Conductor Surface Intermediate Production Liner Perforation Depth MD (ft): Cement Volume MD Length Size TVD Perforation Depth TVD (ft): None Q o None Time v. Depth Plot 0 Drilling Fluid Program Q Date: BOP SketchO Diverter Sketch 0 Drilling Program!!] Seabed Report 0 Shallow Hazard Analysis 0 20 MC 25.050 requirements Q Filing Fee Property Plat 20. Attachments: 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name C. Alvord Signature ÂJ L Ot\ Contact V. Johnson/Z.Kuenzler @ 265-6081/1308 Title Alpine Drilling Team Leader Phone ¿G,S -G ( 2. 0 Date (2..( 8 ( (:> <f- Preoared bv Zane Kuenzler Commission Use Only API Number: Permit Approval 50- /D 3· Z65à if Có Date: /;;2/) 3/ tJ y- O Yes fi(I' No Mud log required 0 Yes g No SUlfìdi measures 0 Yes @' No Directional sUNey required .8 Yes 0 No ~ ~~ \? ~->~, '?:ÞV ~~~'\ ~~NQ \ !::. À.\.{~'( c; x~s.to\Î"\ ~ ~~ f'. \> \. \,) ~ \.=) ().. cJ<- t -::. ~ ,-~<=ð \",) \.~'è) . L((/~ COMMISSIONER ~::~:'~;'ON Date 1'43/¿ 6/2004 ~--- Submit in Qt~i¡te '" (' "---- Permit to Drill Number: 2d-/- ¿ t..f S- See cover letter for other requirements Conditions of approval : ORIGINAL CD2-21 Drilling Hazards Summary (to be posted in Rig Floor Doghouse Prior to Spud) (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) ,12-1/4" Hole /9-5/8" Casina Interval Event Risk Level Conductor Broach Low Well Collision Low Gas Hydrates Low Running Sands and Gravel Low Abnormal Pressure in Surface Formations >2000' TVD Lost Circulation Low Low ~ 8-1/2" Hole / 7" Casina Interval Event Risk Level Abnormal Pressure in Low Surface Formations >2000' TVD Lost circulation Low Hole swabbing on trips Moderate Abnormal Reservoir Pressure Low Hydrogen Sulfide gas .. Low Mitigation Strateqy Monitor cellar continuously during interval. Gyro single shots as required Monitor well at base of permafrost, increased mud weight, decreased mud viscosity, increased circulating times, controlled drilling rates, low mud temperatures Maintain planned mud parameters, Increase mud weight, use weighted sweeps. Increase mud weight Reduce pump rates, mud rheology, lost circulation material, use of low density cement slurries Mitigation Strateqy BOPE drills, Keep mud weight above 9.6 ppg. Check for flow during connections and if needed, increase mud weight. Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECO) monitoring, mud rheology, lost circulation material Reduced trip speeds, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. Well control drills, increased mud weight. No mapped faults occur within 700' of the planned well bore. HzS drills, detection systems, alarms, standard well control practices, mud scavengers 6-1/8" Hole / Horizontal Production Hole Event Risk Level Lost circulation Low Hole swabbing on trips Moderate Abnormal Reservoir Pressure Medium Hydrogen Sulfide gas Low Mitigation Strategy Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material Reduced trip speeds, Pump out to 7" shoe, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. BOPE drills, Keep mud weight above 8.8 ppg. Check for flow during connections and if needed, increase mud weight. Well control drills, increased mud weight. HzS drills, detection systems, alarms, standard well control practices, mud scavengers OR' INAL _""~ø::,; -- Alpine: CD2-21 & CD2-21 PB1 Procedure 1. Move on Doyon 19. 2. Drill 12 ~ hole to the surface casing point as per the directional plan. 3. Run and cement 9 5/8" surface casing. 4. Pressure test casing to 2500 psi. 5. Install and test BOPE to minimum 5000 psi. 6. Drill out 20' of new hole. Perform leak off test. ./' " 7. Drill 8-1/2" hole through the Alpine interval TO @ 21,833' MD/7857' TVD (GRlRES/DENSITY/POROSITY PWD) 8. Plug back the pilot hole with two cement plugs 9. Kick off the cement plug with 8-1/2" drilling assembly. " 10. Drill 8 }i" hole to the intermediate casing point in the Alpine Sand. (LWD tools, GR/RES/PWD) 11. Run and cement 7" casing as per program. Top of cement:: minimum 500 feet MD above Alpine formation. Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus. Note: Additional cement may be required if any sands are deemed commercially viable. -- 12. Pressure test casing to 3500 psi. 13. BOPE Test to 5000 psi. 14. Run drilling assembly. Drill out and perform FIT to 12.5 ppg EMW. Minimum acceptable leak off for drilling ahead is 11.5 ppg. 15. Drill 6-1/8" horizontal section to well TO. (LWD: GRlRES/PWD) 16 Circulate the hole clean and POOH 17. Run 3-%", 9.3 #, L-80 tubing with SSSV, gas lift mandrels, sliding sleeve, landing nipple and production packer. Centralize for Arctic packing. Land hanger. 18. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 19. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. 20. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi /30 mins. 21. Shear open sliding sleeve. Displace tubing and annulus to diesel keeping pressure on the system. 22. Set BPV and secure well. Move rig off. ORiGiNAL Well Proximity Risks: Directional drilling I collision avoidance information as required by 20 ACC 25.050 (b) is provided in following attachments. CD2-23 and its associated plug-back CD2-23PB1 will be the closest well to CD2-21. Well separation is 16.9' @ 700' MD. Accounting for survey uncertainties, the ellipse-to-ellipse separation is 4.5' @ 700' MD. Drillina Area Risks: - There are no high-risk events (e.g. over-pressures zones) anticipated. Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost circulation. Standard LCM material has proved effective in dealing with lost circulation in previous development wells. Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. Annular Pumpina Operations: Incidental fluids developed from drilling operations on well CD2-21 will be injected into a permitted annulus on C02 pad or the class 2 disposal well on CD1 pad. The CD2-21 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there will be 500' of cement fill above the top of the Alpine as per regulations. Upon completion of CD2-21 form 10-403, Application for Sundry Operations, will be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080, could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potablelindustrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi = (12.0 ppg) * (0.052) * (2390') + 1,500 psi = 2,990 psi Pore Pressure = 1,081 psi Therefore Differential = 2991 - 1081 = 1910 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: Wt Connection 85% of 85% of OD (ppf) Grade Range Type Collapse Collapse Burst Burst 9-5/8" 36 J-55 3 BTC 2,020 psi 1,717 psi 3,520 psi 2,992 psi 7" 26 L-80 3 BTC-Mod 5,410 psi 4,599 psi 7,240 psi 6,154 psi ORIGINAL - ",-"/ CD2-21 DRILLING FLUID PROGRAM Density PV YP Funnel Viscosity Initial Gels 10 minute gels API Filtrate HPHT Fluid Loss at 160 PH KCL Oil /water ratio SPUD to 9-5/8"surface casing point - 12 %" 8.8 - 9.6 ppg 20 - 60 100 - 200 Intermediate hole to 7" casing point - 8 }2" Production Hole Section - 6 1/8" 9.6 - 9.8 ppg 10 - 25 15 - 25 8.1-8.8 ppg 10-15 25 -30 /' NC - 10 cc / 30 min 4-8 <18 4 - 12 cc/30 min (drilling) 1 0-1 5 12-20 NA 12-14 cc/30 min 9.0-9.5 6% Approx. 80/20 8.5-9.0 9.0 - 10.0 Surface Hole: A standard high viscosity fresh water / gel spud mud is recommended for the surface interval. Keep flowline viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary. Intermediate Hole Section: Fresh water gel/polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining well bore stability. Production Hole Section: The horizontal production interval will be drilled with a 80/20 oil/water ratio M-I Versa-Pro mineral oil based drill-in fluid. The base fluid will consist of high flash point (>200 F) mineral oil with 25% by weight calcium chloride as the internal phase. Calcium carbonate bridging material will be added to minimize formation damage. ORIGINAL Colville River Field CD2-21 PH Pilot Hole - Prior to Sidetracking RKB - GL = 37' 9.8 ppg drilling mud in hole 9.8 ppg drilling mud in hole Top Alpine Reservoir at 18361' MD 17207' TVO _ Pilot Hole TO at 21833' MO 17857' TVO (+1- 79.2° inc.) > Cement Plug > Updated 12/8/2004 ~ Wellhead 16" Conductor to 114' 9-5/8" 36 ppf J-55 BTC Surface Casing @ 3124' MD /2390' TVD cemented to surface Plug #2: 600' (8500-9100' MD). 17 ppg to kickoff Top of cement plug dressed off to 8500' MD I 5035' TVD (+1- 60.5° inc.) ¿~ Top of Cement Plug #1 at +/- 18133' MD / 7162' TVD 3700 ft ,~ Nechelik Reservoir OfRfGlN'AL CD2-21 Completion Schematic Updated 11/19/2004 Sperry Sun Directional v 16" Conductor to 114' 3-}'2" x 4-}'2" cross-over, 2 jts below 4-%" hanger -- 3-1/2" Camco TRM-4E SSSV Nipple (2.813" 10) at 1935' TVO = 2200' MO -2.813" X~Over -Single ~"xO.049" sls control line :¡¡i::::':'¡ 9-5/8" 36 ppf J-55 STC Ii Surface Casing @ 3123' MD 1 2390' TVO cemented to surface GLJ Camco KBUG GLM (2.867" 10) at 3400' TVD for E Dummy with 1" BK-2 Latch Packer Fluid mix: Diesel in tubing and annulus 3-1/2" 9.3 ppf L-80 1ST Mod. R3 tubing run with Jet Lube Run'n'Seal pipe dope Completion MO TVO Tubing Hanger 32' 32' 4-}2" 12.6 #/ft 1ST-Mod Tubing (2) Crossover 3-1/2", 9.3#/ft, 1ST-Mod Tubing Camco BAL-O SSSV Nipple 2200' 1935' 3-1/2", 9.3#/ft, 1ST-Mod Tubing Camco KSUG GLM (2.867" 10) 5178' 3400' 3-1/2", 9.3#/ft, 1ST-Mod Tubing Camco KSUG GLM (2.867" 10) 9853' 5700' 3-1/2", 9.3#/ft, 1ST-Mod Tubing Camco KSUG GLM (2.867" 10) 12340' 6920' 3-1/2" tubing joints (2) Saker 3-1/2" CMD sliding sleeve 12420' 6962' wi 2.81" X Profile 3-1/2" tubing joint (2) Baker SAB3 Packer 12500' 7002' with millout extension 3-1/2" tubing joints (1) HES "XN" (2.75" 10)-640 inc 12540' 7021' 3-1/2" 10' pup joint WEG 12552' 7028' GLJ Camco KBUG GLM (2.867" 10) at 5700' TVD for E Dummy with 1" BK-2 Latch Cameo KBUG GLM (2.867" 10) 2 joints above sliding sleeve E Dummy with 1" BK-2 Latch Baker 3-%" CMPA sliding sleeve with 2.81 "'X' Profile set 2 joints above SAB3 packer Pinned for 2865 psi annular shear ew 2.81" X Profile Baker Premier Packer at +/- 12500' MD Toe @ +/- 12081' MD / 6796' TVD (500' MD above top of Alpine C) Well TD at 20244' MD I 7230' TVD Top Alpine Cat 13148' MD 17207' TVO 7" 26 ppf L -80 STC Mod Production Casing @ 13339' MO 17228' TVO @ 86.40 ORIGIN A_ CD2-21 PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: N/A Csg Setting Depth MD/TVD(ft) 114/114 3124 I 2390 13339 I 7228 20244 I 7230 Fracture Gradient (Ibs. I gal) 10.9 14.5 16.0 16.0 Pore pressure (psi) 52 1081 3271 3272 ASP Drilling (psi) 53 1563 2549 N/A Casing Size (in) 16 9 5/8 7" . NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to minimum 3500 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1]0 Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in Iblgal 0.052 = Conversion from Ib./gal to psilft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP = FPP - (0.1 x D) Where; FPP = Formation Pore Pressure at the next casing point ASP CALCULATIONS 1 . Drilling below conductor casing (16") ASP = [(FG x 0.052) - 0.1] D = [(10.9 x 0.052) - 0.1] x 114 = 53 psi OR ASP = FPP - (0.1 x D) = 1081 - (0.1 x 2390) = 842 psi 2. Drilling below surface casing (9 5/8") ASP = [(FG x 0.052) - 0.1] 0 = [(14.5 x 0.052) - 0.1] x 2390 = 1563 psi OR ASP = FPP - (0.1 x D) = 3271 - (0.1 x 7228') = 2548 psi 3. Drilling below intermediate casing (7") ASP = FPP - (0.1 x D) = 3272 - (0.1 x 7230') = 2549 psi dAlsr:NAL "- 9 5/8" Surface Casinv run to 3124' MD 12390' TVD. Cement from 3124' MD to 2614' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 2514' to surface with Arctic Set Lite 3. Assume 3000/0 excess annular volume in permafrost and 50% excess below the permafrost (1795' MD). Lead slurry: System: Tail slurry: System: (2514'-1795') X 0.3132 ft3/ft X 1.5 (50% excess) = 359.1 ft3 below pennafrost 1795' X 0.3132 ft3/ft X 4 (300% excess) = 2248.8 ft3 above pennafrost Total volume = 359.1 + 2248.8 = 2607.9 ft3 => 582 Sx @ 4.48 ft3/sk 578 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.45 ft3/sk, Class G + 30% D053 thixotropic additive, 0.6% D046 antifoamer, 1.5% D079 extender, 1.5% SOOI accelerator, 50% D 124 extender and 9% BWOW1 D044 freeze suppressant 500' X 0.3132 felft X 1.5 (50% excess) = 234.9 fe annular volume 80' X 0.4341 ft3/ft = 34.7 ft3 shoe joint volume Total volume = 234.9 + 34.7 = 269.6 ft3 => 230 Sx @ 1.17 ft3/sk 230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1% S002 accelerator @ 15.8 PPG yielding 1.17 ft3/sk Pilot Hole Cementine: Requirements Cement Plug #1 : 21833' MD to 18133' MD = 3700'. Cement with Class G + additives @ 15.8 ppg. Assume 150/0 excess on open hole volume. Slurry: 3700' X 0.3941 ft3/ft X 1.15 (15% excess) = 1676.9 ft3 => 1446 Sx @ 1.16 fe/sk Cement Plug #2 : 8500' MD to 9100' MD = 600'. Cement with Class G + additives @ 17 ppg. Assume 150/0 excess on open hole volume. Slurry: 600' X 0.3941 felft X 1.15 (15% excess) = 271.9 ft3 => 237 Sx @ 1.16 felsk 7" Intermediate Casint! run to 13339 MD I 7228' TVD Cement from 13339' MD to +1- 12081' MD (minimum 500' MD above top of Alpine C Formation) with Class G + adds @ 15.8 PPG. Assume 40% excess annular volume. Slurry: System: (13339' - 12081') X 0.1268 fe/ft X 1.4 (40% excess) = 223.3 ft3 annular vol. 80' X 0.2148 fe 1ft = 17.2 fe shoe joint volume Total volume = 223.3 + 17.2 = 240.5 ft3 => 208 Sx @ 1.16 felsk 208 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant, 0.07% B155 retarder and 0.4% D167 fluid loss additive @ 15.8 PPG yielding 1.15 felsk 1 By Weight Of mix Water, all other additives are BWOCement ORIGINAl_ '. ~Ph/ _II"' Conococ. .... ··I.ips ConocoPhillips Alaska Inc. Colville River Unit Alpine CD2 Plan: CD2-21 Plan: CD2-21 Plan: Plan: CD2-21 (wp06) Standard Planning Report 07 December, 2004 nR'r:~CNAL' \,J, I ". l Ç), L, i.' ,.' r I ~\ ";- Conoc;"PhilUps -w- ~ -- Z 15000- E - 00 N U OJ (/) 13750- ¡¡{ u. ~ I'- I'- N I _- ~ (..- 12500- .J'--- _ z ~ ~ or (;) z (;) N -..... ..... 11250- ~- ~ - 0 N ~ ~ -- ~ _ - -CI) - g' üf 10000- ~ - :¡; I/) (() I'- CJ) I Ò g II ::æ oð I 8750- ~- ~ ~/ ..... u.. 01 ê ~ ~ ~ I S ~ ~ I/~ I ¡¡;: (;) N/..... I N '-" / L{) I 25 7500-.:.:.-ö-~ / L() - -g ¡:: ~ I -C- ~ ~ ¢:: ó/ ~ -+ ,¡,: 0 :2 I ~ ::c 6250- ~- ~- ~/ ~ t -:rl g¡ ~ 0 ..¡ Z~OI ~ t--.. c; ¡:: ~ n ãí § r:: ¢:: ò -- ~ ¢:: -:-: ~ ::æ :5 5000- {!.- ~ - CI)- ~- ~ :::.¡ - oo; ' ëS ~ g o ~ 00 01.{) ~ ø . I/) C"'J Ó t--. ";:: @) ~ ~ -------- ë>-ð-b-~ ~ .!: g ~ '0 g> 0 I'- __ æ a:J &L _ _ - @)- - - - - - - - - - - - - - - CI) 0::> ~ Q) - .¡;-- - õ (/) I ~ £ ~ ä: ..: $-5 C -g 'õ ~ 0. OJ c: 0- __W^_______, _____'_'m~·__n__..___.___·_" ï=: c: 'ÕJ Q) a:J 3750 2500 1250 ConocoPhillips Alaska Inc. '~' Project: Colville River Unit Site: Alpine CD2 Well: Plan: CD2-21 Well bore: Plan: CD2-21 Plan: Plan: CD2-21 (wp06) Approved Plan Calculation Method: Error .$ystem: Scan Method: Error Surface: Warning Method: ~-~ I I I I Csg Pt ... Begin 6-1/8" hole: 13339.000ft MD, 7228.2500 TVD -- Continue Dir Dír@4.00DLS: 12425.7000 MD,6966.177ftTVD -2500----------------·--·------ I I I I I I I I I I I I I I I I I I I I I I I I I I -1 5000 -11250 -7500 -3750 1250 -2500 -1250 -6250 -5000 -10000 -8750 -13750 -12500 W est( - )/East( +) (2500 ft/in) SECTION DETAILS See MD Inc 1 36.100 0.000 2 200.000 0.000 3 1100.000 18.000 4 2243.286 60.531 5 12425.681 60.531 6 13459.686 90.017 7 20244.038 90.017 Azi TVD +N/-S +El·W Dl-¡¡g TFace vSec Target 0.000 36.100 0.000 0.000 0.00 0.00 0;000 0.000 200.000 0.000 0.000 0.00 0:00 0.000 270.000 1085.269 0.000 -140.213 2.00 270.00 101.990 301.191 1956.928 272.364 ·776.760 4.00 39.03 751;912 301.191 6966.167 4863.509 ..a360~300 0.00 0.00 9418.666 331.618 7232.000 !$582.997 ·9020.004 4.00 50.0310392.258 CD2-21 New Hëel D1.618 n~.OOO11D1.8",1ÕR rG illà [~H@ ;\ It\!.,J.IU¡t¡RtE}S f'4)'\.nhV"·" !!5PE!~~'v..SL:J~ D À I L.~JJ':!! ti 5 eI\Y:.H;.:i:!i,! ConocoPhillips Alaska Inc. ~/' ConocoPhillips 10/.) ~o vE;I (fþ í'~q Engineering Error System: Calculation Method: Scan Method: Error Surface: Alpine Minimum Curvature ISCWSA Trav. Cylinder North Elliptical Conic Rules Based Project: Colville River Unit Site: Alpine CD2 Well: Plan: CD2-21 Wellbore: Plan: CD2-21 Plan: Plan: CD2-21 (wp06) o ;a -...sf. G1 -- :zj ~ ü 113 > Q) :J ~ 2500 7500 w_w_ '<t _ '<t - a:: a:: Z Z N N ~ f7 eX; N N u-u- Q) Q) C/) C/) ~~__L__~_ ~ ~ r- Cú N m '<t '<t ..i oð Z ...J . LL Z §_ LL_ o ~ ..- r- ..- m ~ '<t g Ö I- --.:..., ¡::: g I';:: o 1 '<t o I Cú r--: 1 ~ :21 ~ r- a:> ~-~~! ::;¡: .;:: ~ g 0_ <0_ ~ ~ N a:> ~ :g :J ro I C/) - (1) - ~ -- Q) .s::. u Q) Z ~-' ã) 0> ro ~ -2500 -1250-- 10000--1 - I I [I I I I I I -2500 -1250 1250 2500 3750 5000 6250 7500 8750 10000 (Toe) : 20244.0300 MD, 7230.0000 TVD, (793ft FNL, 3213ft FEL, Sec28-T12N-R4E I I I I , , I ' I , I I ' I I I I ' " I I I I I I I I ' , I I I I I I' I I 11250 12500 13750 15000 16250 17500 18750 20000 21250 C::;PPI"""r"V-5un DRILLING SERVIces \ tntU1!;I},at'_ fH':at·~'\ Conoc;Phillips Database: Company: Project: Site: Well: Wellbore: Design: Project Map System: Geo Datum: Map Zone: Site Site Position: From: Position Uncertainty: Well SPERRY_SUN HES Planning Report EOM 2003.11 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine C02 Plan: C02-21 Plan: C02-21 Plan: C02-21 (wp06) Curvature Plan: C02-21 MSL @ 52.000ft (52' MSL) MSL @ 52.000ft (52' MSL) Colville River Unit, North Slope Alaska, United States US State Plane 1927 (Exact solution) NAO 1927 (NAOCON CONUS) Alaska Zone 04 Mean Sea Level USing Well Reference Point USing geodetic scale factor System Datum: Alpine C02 Map Northing: Easting: Slot Radius: 5,974,641.660ft 371,696.240 ft 0" Latitude: Longitude: Grid Convergence: 70· 20' 20.225" N 151002' 28.083" W -0.98 0 0.000 ft Plan: C02-21, CD2-21 Slot 0.000 ft 0.000 ft 0.000 ft 5,974,582.280 ft 371,702.510 ft ft 70020' 19.642" N 151002' 27.870" W 0.000 ft Position Uncertainty Well Position +N/-S +E/-W Northing: Easting: Wellhead Elevation: Latitude: Longitude: Ground Level: Wellbore Magnetics Dellign Audit Notes: Version: Ve.ffic~l~eçtion: Plan: CD2-21 ModêlName BGGM2004 23.88 80.60 57,504 8/25/2004 Plan: C02-21 (wp06) 11 PLAN 36.100 Phase: Tie On Depth: 36.100 0.000 0.000 313.332 36.100 0.000 0.000 36.100 0.000 0.000 0.00 0.00 0.00 0.00 200.000 0.000 0.000 200.000 0.000 0.000 0.00 0.00 0.00 0.00 1,100.000 18.000 270.000 1,085.269 0.000 -140.213 2.00 2.00 0.00 270.00 2,243.286 60.531 301.191 1,956.928 272.364 -776.760 4.00 3.72 2.73 39.03 12,425.681 60.531 301.191 6,966.167 4,863.509 -8,360.300 0.00 0.00 0.00 0.00 13,459.686 90.017 331.618 7,232.000 5,582.997 -9,020.004 4.00 2.85 2.94 50.03 CD2-21 New Heel 20,244.038 90.017 331.618 7,230.000 11,551.850 -12,244.940 0.00 0.00 0.00 0.00 C02-21 Toe ----- 1211/2004 2:53.·35PM Page 20f9 ORIGINAL COMPASS 2003. 11 Build 48 Conoc;p.,illips SPERRY - SUN HES Planning Report Database: EDM 2003.11 Single User Db Local Co-ordinate Reference: Well Plan: CD2-21 Company: ConocoPhillips Alaska Inc. (Alpine) TVD Reference: 52' MSL @ 52.000ft (52' MSL) Project: Colville River Unit MD Reference: 52' MSL @ 52.000ft (52' MSL) Site: Alpine CO2 North Reference: True Well: Plan: C02-21 Survey Calculation Method: Minimum Curvature Wellbore: Plan: C02-21 Design: Plan: C02-21 (wp06) --- --~-_._--------- -----~~-- Planned. Survey Measured Vertical Vertical Dogl~g Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate (ft) {oJ (oJ (ft) (ft) (ft) (ft) (o/100ft) (O/100ft) (o/100ft) 36.100 0.000 0.000 36.100 0.000 0.000 0.000 0.00 0.00 0.00 SL (1775'FNL & 153S'FEL, Sec2-T11N-R4E) 100.000 0.000 0.000 100.000 0.000 0.000 0.000 0.00 0.00 0.00 200.000 0.000 0.000 200.000 0.000 0.000 0.000 0.00 0.00 0.00 200.100 0.000 270.000 200.100 0.000 0.000 0.000 0.00 0.00 0.00 Begin Dir @ 2.00DLS: 200.100ft MD,200.100ft TVD 300.000 2.000 270.000 299.980 0.000 -1.745 1.269 2.00 2.00 0.00 400.000 4.000 270.000 399.838 0.000 -6.978 5.076 2.00 2.00 0.00 500.000 6.000 270.000 499.452 0.000 -15.694 11.415 2.00 2.00 0.00 600.000 8.000 270.000 598.702 0.000 -27.880 20.280 2.00 2.00 0.00 700.000 10.000 270.000 697.465 0.000 -43.523 31.658 2.00 2.00 0.00 800.000 12.000 270.000 795.623 0.000 -62.603 45.537 2.00 2.00 0.00 900.000 14.000 270.000 893.055 0.000 -85.096 61.899 2.00 2.00 0.00 1,000.000 16.000 270.000 989.643 0.000 -110.977 80.724 2.00 2.00 0.00 1,100.000 18.000 270.000 1,085.269 0.000 -140.213 101.990 2.00 2.00 0.00 Continue Dir@4.00 DLS: 1100.010ft MD, 10S5.27Sft TVD 1,200.000 21.252 276.960 1,179.459 2.197 -173.667 127.832 4.00 3.25 6.96 1,300.000 24.716 282.098 1,271.516 8.778 -212.115 160.314 4.00 3.46 5.14 1,400.000 28.314 286.022 1,360.990 19.709 -255.368 199.278 4.00 3.60 3.92 1,500.000 32.000 289.118 1,447.445 34.939 -303.217 244.534 4.00 3.69 3.10 1,600.000 35.748 291.631 1,530.461 54.393 -355.427 295.861 4.00 3.75 2.51 1,700.000 39.539 293.722 1,609.632 77.976 -411 .744 353.009 4.00 3.79 2.09 1,800.000 43.362 295.502 1,684.574 105.573 -471.895 415.700 4.00 3.82 1.78 1,900.000 47.209 297.045 1,754.920 137.050 -535.586 483.628 4.00 3.85 1.54 2,000.000 51.074 298.408 1,820.329 172.253 -602.507 556.463 4.00 3.87 1.36 2,100.000 54.953 299.629 1,880.481 211.012 -672.331 633.850 4.00 3.88 1.22 2,200.000 58.844 300.739 1,935.083 253.136 -744.719 715.411 4.00 3.89 1.11 2,243.286 60.531 301.191 1,956.928 272.364 -776.760 751.912 4.00 3.90 1.04 End Dir, Start Sail @ 60.531: 2243.290ft MD, 1956.930ft TVD 2,300.000 60.531 301.191 1,984.828 297.936 -818.999 800.184 0.00 0.00 0.00 2,400.000 60.531 301.191 2,034.023 343.025 -893.476 885.299 0.00 0.00 0.00 2,500.000 60.531 301.191 2,083.219 388.114 -967.953 970.414 0.00 0.00 0.00 2,600.000 60.531 301.191 2,132.414 433.203 -1,042.430 1,055.529 0.00 0.00 0.00 2,700.000 60.531 301.191 2,181.609 478.292 -1,116.907 1,140.644 0.00 0.00 0.00 2,800.000 60.531 301.191 2,230.804 523.381 -1,191.384 1,225.760 0.00 0.00 0.00 2,900.000 60.531 301.191 2,279.999 568.470 -1,265.861 1,310.875 0.00 0.00 0.00 3,000.000 60.531 301.191 2,329.194 613.559 -1,340.338 1,395.990 0.00 0.00 0.00 3,100.000 60.531 301.191 2,378.389 658.648 -1,414.815 1,481.105 0.00 0.00 0.00 3,123.602 60.531 301.191 2,390.000 669.290 -1,432.393 1,501.193 0.00 0.00 0.00 9-5/S" Csg Pt... Drill out S-1/2" Hole: 3123.602ft MD, 2390.000ft TVD - 9 5/8" Csg Pt@ 3124' MD 3,147.994 60.531 301.191 2,402.000 680.288 -1,450.560 1,521.955 0.00 0.00 0.00 C-30 3,200.000 60.531 301.191 2,427.584 703.737 -1,489.292 1,566.220 000 0.00 0.00 3,300.000 60.531 301.191 2,476.779 748.826 -1,563.769 1,651.335 0.00 0.00 0.00 3,400.000 60.531 301.191 2,525.974 793.915 -1,638.246 1,736.450 0.00 0.00 0.00 3,500.000 60.531 301.191 2,575.170 839.004 -1,712.723 1,821.565 0.00 0.00 0.00 3,600.000 60.531 301.191 2,624.365 884.093 -1,787.200 1,906.680 0.00 0.00 0.00 3,700.000 60.531 301.191 2,673.560 929.182 -1,861.677 1,991.795 0.00 0.00 0.00 3,800.000 60.531 301.191 2,722.755 974.271 -1,936.154 2,076.910 0.00 000 0.00 3,900.000 60.531 301.191 2,771.950 1,019.361 -2,010.631 2,162.026 0.00 0.00 0.00 3,904.167 60.531 301.191 2,774.000 1,021.239 -2,013.735 2,165.572 0.00 0.00 0.00 C-20 4,000.000 60.531 301.191 2,821.145 1,064.450 -2,085.108 2,247.141 0.00 0.00 0.00 1217/2004 2.·53:35PM Page 3 of 9 COMPASS 2003.11 Build 48 o R I G1N1At "-" y/ SPERRY_ SUN HES ConocoPhillips Planning Report Database: EDM 2003.11 Single User Db Plan: CD2-21 Company: ConocoPhillips Alaska Inc. (Alpine) MSL @ 52.000ft (52' MSL) Project: Colville River Unit MSL @ 52.000ft (52' MSL) Site: Alpine CD2 W..II: Plan: CD2-21 Wellbore: Plan: CD2-21 Design: Plan: CD2-21 (wp06) Planned Survey Measure~ Wl"tiëal Depth Inclination Azimuth ~êptb (ft) (0) (,,) (ft) 4,100.000 60.531 301.191 2,870.340 1,109.539 -2,159.585 2,332.256 0.00 0.00 0.00 4,200.000 60.531 301.191 2,919.535 1,154.628 -2,234.062 2,417.371 0.00 0.00 0.00 4,300.000 60.531 301.191 2,968.730 1,199.717 -2,308.539 2,502.486 0.00 0.00 0.00 4,400.000 60.531 301.191 3,017.925 1,244.806 -2,383.016 2,587.601 0.00 0.00 0.00 4,500.000 60.531 301.191 3,067.121 1,289.895 -2,457.493 2,672.716 0.00 0.00 0.00 4,600.000 60.531 301.191 3,116.316 1,334.984 -2,531.970 2,757.831 0.00 0.00 0.00 4,700.000 60.531 301.191 3,165.511 1,380.073 -2,606.447 2,842.946 0.00 0.00 0.00 4,800.000 60.531 301.191 3,214.706 1,425.162 -2,680.924 2,928.061 0.00 0.00 0.00 4,900.000 60.531 301.191 3,263.901 1,470.251 -2,755.401 3,013.176 0.00 0.00 0.00 5,000.000 60.531 301.191 3,313.096 1,515.340 -2,829.878 3,098.291 0.00 0.00 0.00 5,100.000 60.531 301.191 3,362.291 1,560.429 -2,904.355 3,183.407 0.00 0.00 0.00 5,200.000 60.531 301.191 3,411 .486 1,605.518 -2,978.832 3,268.522 0.00 0.00 0.00 5,300.000 60.531 301.191 3,460.681 1,650.607 -3,053.309 3,353.637 0.00 0.00 0.00 5,400.000 60.531 301.191 3,509.876 1,695.696 -3,127.785 3,438.752 0.00 0.00 0.00 5,500.000 60.531 301.191 3,559.072 1,740.785 -3,202.262 3,523.867 0.00 0.00 0.00 5,600.000 60.531 301.191 3,608.267 1,785.874 -3,276.739 3,608.982 0.00 0.00 0.00 5,700.000 60.531 301.191 3,657.462 1,830.963 -3,351.216 3,694.097 0.00 0.00 0.00 5,800.000 60.531 301.191 3,706.657 1,876.053 -3,425.693 3,779.212 0.00 0.00 0.00 5,900.000 60.531 301.191 3,755.852 1,921.142 -3,500.170 3,864.327 0.00 0.00 0.00 6,000.000 60.531 301.191 3,805.047 1,966.231 -3,574.647 3,949.442 0.00 0.00 0.00 6,069.017 60.531 301.191 3,839.000 1,997.350 -3,626.049 4,008.186 0.00 0.00 0.00 K-3 Marker 6,100.000 60.531 301.191 3,854.242 2,011.320 -3,649.124 4,034.557 0.00 0.00 0.00 6,200.000 60.531 301.191 3,903.437 2,056.409 -3,723.601 4,119.673 0.00 0.00 0.00 6,300.000 60.531 301.191 3,952.632 2,101.498 -3,798.078 4,204.788 0.00 0.00 0.00 6,400.000 60.531 301.191 4,001.827 2,146.587 -3,872.555 4,289.903 0.00 0.00 0.00 6,473.529 60.531 301.191 4,038.000 2,179.740 -3,927.317 4,352.487 0.00 0.00 0.00 Basal K-3 Sand 6,500.000 60.531 301.191 4,051.023 2,191.676 -3,947.032 4,375.018 0.00 0.00 0.00 6,526.380 60.531 301.191 4,064.000 2,203.570 -3,966.679 4,397.471 0.00 0.00 0.00 K-2 Marker 6,600.000 60.531 301.191 4,100.218 2,236.765 -4,021.509 4,460.133 0.00 0.00 0.00 6,700.000 60.531 301.191 4,149.413 2,281.854 -4,095.986 4,545.248 0.00 0.00 0.00 6,705.259 60.531 301.191 4,152.000 2,284.225 -4,099.903 4,549.724 0.00 0.00 0.00 Base K-2 Cycle 6,800.000 60.531 301.191 4,198.608 2,326.943 -4,170.463 4,630.363 0.00 0.00 0.00 6,900.000 60.531 301.191 4,247.803 2,372.032 -4,244.940 4,715.478 0.00 0.00 0.00 7,000.000 60.531 301.191 4,296.998 2,417.121 -4,319.417 4,800.593 0.00 0.00 0.00 7,100.000 60.531 301.191 4,346.193 2,462.210 -4,393.894 4,885.708 0.00 0.00 0.00 7,200.000 60.531 301.191 4,395.388 2,507.299 -4,468.371 4,970.823 0.00 0.00 0.00 7,300.000 60.531 301.191 4,444.583 2,552.388 -4,542.848 5,055.939 0.00 0.00 0.00 7,400.000 60.531 301.191 4,493.778 2,597.477 -4,617.325 5,141.054 0.00 0.00 0.00 7,500.000 60.531 301.191 4,542.974 2,642.566 -4,691.802 5,226.169 0.00 0.00 0.00 7,600.000 60.531 301.191 4,592.169 2,687.656 -4,766.279 5,311.284 0.00 0.00 0.00 7,700000 60.531 301.191 4,641.364 2,732.745 -4,840.756 5,396.399 0.00 0.00 0.00 7,800.000 60.531 301.191 4,690.559 2,777.834 -4,915.233 5,481.514 0.00 0.00 0.00 7,900.000 60.531 301.191 4,739.754 2,822.923 -4,989.710 5,566.629 0.00 0.00 0.00 8,000.000 60.531 301.191 4,788.949 2,868.012 -5,064.187 5,651.744 0.00 0.00 0.00 8,100.000 60.531 301.191 4,838.144 2,913.101 -5,138.664 5,736.859 0.00 0.00 0.00 8,200.000 60.531 301.191 4,887.339 2,958.190 -5,213.141 5,821.974 0.00 0.00 0.00 8,300.000 60.531 301.191 4,936.534 3,003.279 -5,287.618 5,907.089 0.00 0.00 0.00 8,400.000 60.531 301.191 4,985.729 3,048.368 -5,362.095 5,992.204 0.00 0.00 0.00 ______ª-.?Qº-. 000 __~O. 531 301.191 5,034.925 3,093.457 -5,436.572 6,077.320 0.00 0.00 0.00 12///2004 2:53:35PM Page 4of9 COMPASS 2003. 11 Build 48 ORIGINAL ConocÓPhillips SPERRY - SUN HES Planning Report Database: EDM 2003.11 Single User Db Local Co-ordinate Reference: Well Plan: CD2-21 Company: ConocoPhillips Alaska Inc. (Alpine) TVD Reference: 52' MSL @ 52.000ft (52' MSL) Project: Colville River Unit MD Reference: 52' MSL @ 52.000ft (52' MSL) Site: Alpine CD2 North Reference: True Well: Plan: CD2-21 Survey Calculation· Method: Minimum Curvature Wellbore: Plan: CD2-21 Design: Plan: CD2-21 (wp06) Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate (ft) (0) (0) (ft) (ft) (ft) (ft) (0/100ft) (0/100ft) (0/100ft) Beginning point for Pilot Hole: 8500.000 ft MD, 5034.925 ft TVD 8,600.000 60.531 301.191 5,084.120 3,138.546 -5,511.049 6,162.435 0.00 0.00 0.00 8,700.000 60.531 301.191 5,133.315 3,183.635 -5,585.526 6,247.550 0.00 0.00 0.00 8,800.000 60.531 301.191 5,182.510 3,228.724 -5,660.003 6,332.665 0.00 0.00 0.00 8,847.749 60.531 301.191 5,206.000 3,250.254 -5,695.565 6,373.306 0.00 0.00 0.00 Albian 97 8,900.000 60.531 301.191 5,231.705 3,273.813 -5,734.480 6,417.780 0.00 0.00 0.00 9,000.000 60.531 301.191 5,280.900 3,318.902 -5,808.956 6,502.895 0.00 0.00 0.00 9,100.000 60.531 301.191 5,330.095 3,363.991 -5,883.433 6,588.010 0.00 0.00 0.00 9,200.000 60.531 301.191 5,379.290 3,409.080 -5,957.910 6,673.125 0.00 0.00 0.00 9,300.000 60.531 301.191 5,428.485 3,454.169 -6,032.387 6,758.240 0.00 0.00 0.00 9,400.000 60.531 301.191 5,477.680 3,499.258 -6,106.864 6,843.355 0.00 0.00 0.00 9,500.000 60.531 301.191 5,526.876 3,544.348 -6,181.341 6,928.470 0.00 0.00 0.00 9,600.000 60.531 301.191 5,576.071 3,589.437 -6,255.818 7,013.586 0.00 0.00 0.00 9,700.000 60.531 301.191 5,625.266 3,634.526 -6,330.295 7,098.701 0.00 0.00 0.00 9,800.000 60.531 301.191 5,674.461 3,679.615 -6,404.772 7,183.816 0.00 0.00 0.00 9,900.000 60.531 301.191 5,723.656 3,724.704 -6,479.249 7,268.931 0.00 0.00 0.00 10,000.000 60.531 301.191 5,772.851 3,769.793 -6,553.726 7,354.046 0.00 0.00 0.00 10,100.000 60.531 301.191 5,822.046 3,814.882 -6,628.203 7,439.161 0.00 0.00 0.00 10,200.000 60.531 301.191 5,871.241 3,859.971 -6,702.680 7,524.276 0.00 0.00 0.00 10,240.164 60.531 301.191 5,891.000 3,878.081 -6,732.593 7,558.462 0.00 0.00 0.00 Albian 96 10,300.000 60.531 301.191 5,920.436 3,905.060 -6,777.157 7,609.391 0.00 0.00 0.00 10,400.000 60.531 301.191 5,969.631 3,950.149 -6,851.634 7,694.506 0.00 0.00 0.00 10,500.000 60.531 301.191 6,018.827 3,995.238 -6,926.111 7,779.621 0.00 0.00 0.00 10,600.000 60.531 301.191 6,068.022 4,040.327 -7,000.588 7,864.736 0.00 0.00 0.00 10,700.000 60.531 301.191 6,117.217 4,085.416 -7,075.065 7,949.851 0.00 0.00 0.00 10,800.000 60.531 301.191 6,166.412 4,130,505 -7,149.542 8,034.967 0.00 0.00 0.00 10,900.000 60.531 301.191 6,215.607 4,175.594 -7,224.019 8,120.082 0.00 0.00 0.00 11,000.000 60.531 301.191 6,264.802 4,220.683 -7,298.496 8,205.197 0.00 0.00 0.00 11,100.000 60.531 301.191 6,313.997 4,265.772 -7,372.973 8,290.312 0.00 0.00 0.00 11,200.000 60.531 301.191 6,363.192 4,310.861 -7,447.450 8,375.427 0.00 0.00 0.00 11,300.000 60.531 301.191 6,412.387 4,355.951 -7,521.927 8,460.542 0.00 0.00 0.00 11,400.000 60.531 301.191 6,461.582 4,401.040 -7,596.404 8,545.657 0.00 0.00 0.00 11,500.000 60.531 301.191 6,510.778 4,446.129 -7,670.881 8,630.772 0.00 0.00 0.00 11,600.000 60.531 301.191 6,559.973 4,491.218 -7,745.358 8,715.887 0.00 0.00 0.00 11,700.000 60.531 301.191 6,609.168 4,536.307 -7,819.835 8,801.002 0.00 0.00 0.00 11,800.000 60.531 301.191 6,658.363 4,581.396 -7,894.312 8,886.117 0.00 0.00 0.00 11,900.000 60.531 301.191 6,707.558 4,626.485 -7,968.789 8,971.233 0.00 0.00 0.00 12,000.000 60.531 301.191 6,756.753 4,671.574 -8,043.266 9,056.348 0.00 0.00 0.00 12,100.000 60.531 301.191 6,805.948 4,716.663 -8,117.743 9,141.463 0.00 0.00 0.00 12,183.447 60.531 301.191 6,847.000 4,754.288 -8,179891 9,212.489 0,00 0.00 0.00 HRZ 12.200000 60.531 301.191 6,855143 4,761.752 -8,192.220 9,226.578 0.00 0.00 0.00 12,300.000 60.531 301.191 6,904.338 4,806.841 -8,266.697 9,311.693 0.00 0.00 0.00 12,400.000 60.531 301,191 6,953.533 4,851.930 -8,341.174 9,396.808 0.00 0.00 0.00 12,425.681 60.531 301,191 6,966.167 4,863.509 -8,360.300 9,418.666 0.00 0.00 0.00 Begin Dir @ 4.00DLS: 12425.700ft MD,6966.177ft TVD 12,500.000 62.464 303.759 7,001.634 4,898.583 -8,415.382 9,482.801 4.00 2.60 3.45 12,522.650 63.064 304.525 7,012.000 4,909.887 -8,432.049 9,502.681 401 2.65 3.38 Base HRZ 12,600.000 65.137 307.075 7,045.787 4,950594 -8,488.466 9,571.653 4.00 2.68 3.30 12/7/2004 2.·S3.·35PM Page 5 of 9 COMPASS 2003.11 Build 48 o R I GI NA L Conoc~illips SPERRY_SUN HES Planning Report Database: Company: Project: Site: Well: Wellbore: Design: EDM 2003.11 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine C02 Plan: C02-21 Plan: C02-21 Plan: C02-21 (wp06) Well Plan: CD2-21 52' MSL @ 52.000ft (52' MSL) 52' MSL @ 52.000ft (52' MSL) True Minimum Curvature Local Co-ordinate Reference: TVD Reference: MD Reference: North. Reference: Survey Calculation Method: Planned Survey Measured Depth (ft) Inclination (0) 12,646.826 66.415 K-1 Marker 12,700.000 67.881 12,758.779 69.523 Kuparuk Fm 12,800.000 70.683 12,900.000 73.535 12,915.195 73.973 LCU-Miluveach 13,000.000 76.427 13,005.731 76.595 Miluveach A 13,070.628 78.490 Alpine D Azimuth e) 308.580 7,065.000 4,976.784 -8,522.191 9,614.157 4.00 310.250 7,085.650 5,007.897 -8,560.043 9,663.040 4.00 312.059 7,107.000 5,043.939 -8,601.270 9,717.761 4.00 313.301 7,121.028 5,070.215 -8,629.763 9,756.517 4.00 316.249 7,151.749 5,137.243 -8,697.286 9,851.629 4.00 316.691 7,156.000 5,147.820 -8,707.334 9,866.196 4.01 319.111 7,177.663 5,208.654 -8,762.285 9,947.913 4.00 319.275 7,179.000 5,212.872 -8,765.926 9,953.456 4.04 321.092 7,193.000 5,261.544 -8,806.498 10,016.367 4.00 79.350 80.776 321.904 323.238 7,198.644 7,207.000 5,284.101 5,321.977 -8,824.441 -8,853.428 10,044.899 10,091.974 3.99 4.00 13,100.000 13,148.424 Alpine C 13,200.000 82.298 324.643 7,214.590 5,363.217 -8,883.453 10,142.114 13,300.000 85.262 327.345 7,225.423 5,445.615 -8,939.033 10,239.086 13,339.000 86.423 328.393 7,228.250 5,478.554 -8,959.719 10,276.737 7" Csg Pt... Begin 6-1/8" hole: 13339.000ft MD, 7228.250ft TVD - Continue Dir -7" Csg pt@ 13339' MD 13,400.000 88.237 330.023 7,231.090 5,530.895 -8,990.909 10,335.341 4.00 13,459.686 90.017 331.618 7,232.000 5,582.997 -9,020.004 10,392.258 4.00 Target (Heel) GeoSteer, 13459.680ft MD, 7231.998ft TVD, (1478ft FNL, 5273ft FEL, Sec34-T12N-R4E· CD2-21 New Heel 13,500.000 90.017 331.618 7,231.988 5,618.465 -9,039.167 10,430.536 0.00 13,600.000 90.017 331.618 7,231.959 5,706.445 -9,086.702 10,525.486 0.00 13,700.000 90.017 331.618 7,231.929 5,794.424 -9,134.237 10,620.436 0.00 13,800.000 90.017 331.618 7,231.900 5,882.404 -9,181.772 10,715.386 0.00 13,900.000 90.017 331.618 7,231.870 5,970.384 -9,229.307 10,810.336 0.00 14,000.000 90.017 331.618 7,231.841 6,058.363 -9,276.842 10,905.287 0.00 14,100.000 90.017 331.618 7,231.811 6,146.343 -9,324.377 11,000.237 0.00 14,200.000 90.017 331.618 7,231.782 6,234.323 -9,371.912 11,095.187 0.00 14,300.000 90.017 331.618 7,231.752 6,322.303 -9,419.447 11,190.137 0.00 14,400.000 90.017 331.618 7,231.723 6,410.282 -9,466.982 11,285.087 0.00 14,500.000 90.017 331.618 7,231.693 6,498.262 -9,514.516 11,380.037 0.00 14,600.000 90.017 331.618 7,231.664 6,586.242 -9,562.051 11,474.987 0.00 14,700.000 90.017 331.618 7,231.634 6,674.221 -9,609.586 11,569.937 0.00 14,800.000 90.017 331.618 7,231.605 6,762.201 -9,657.121 11,664.887 0.00 14,900.000 90.017 331.618 7,231.575 6,850.181 -9,704.656 11,759.838 0.00 15,000.000 90.017 331.618 7,231.546 6,938.161 -9,752.191 11,854.788 0.00 15,100.000 90.017 331.618 7,231.516 7,026.140 -9,799.726 11,949.738 0.00 15,200.000 90.017 331.618 7,231.487 7,114.120 -9,847.261 12,044.688 0.00 15,300.000 90.017 331.618 7,231.457 7,202.100 -9,894.796 12,139.638 0.00 15,400.000 90.017 331.618 7,231.428 7,290.079 -9,942.331 12,234.588 0.00 15,500.000 90.017 331.618 7,231.399 7,378.059 -9,989.866 12,329.538 0.00 15,600.000 90.017 331.618 7,231.369 7,466.039 -10,037.401 12,424.488 0.00 15,700.000 90.017 331.618 7,231.340 7,554.019 -10,084.936 12,519.438 0.00 15,800.000 90.017 331.618 7,231.310 7,641.998 -10,132.470 12,614.389 0.00 15,900.000 90.017 331.618 7,231.281 7,729.978 -10,180.005 12,709.339 0.00 16,000.000 90.017 331.618 7,231.251 7,817.958 -10,227.540 12,804.289 0.00 16,100.000 90.017 331.618 7,231.222 7,905.937 -10,275.075 12,899.239 0.00 16,200.000 90.017 331.618 7,231.192 7,993.917 -10,322.610 12,994.189 0.00 4.00 4.00 4.01 12/7/2004 2:53:35PM Page 6 of 9 ÜRIGINAL 2.73 3.21 2.76 3.14 2.79 3.08 2.81 3.02 2.85 2.95 2.89 2.91 2.89 2.85 2.94 2.85 2.92 2.80 2.93 2.77 2.95 2.75 2.95 2.73 2.96 2.70 2.98 2.69 2.97 2.67 2.98 2.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 COMPASS 2003.11 Build 48 Conoc;r;hillips SPERRY - SUN HES Planning Report Database: EDM 2003.11 Single User Db LocalCo-ordlnateReference: Well Plan: CD2-21 Comp¡JOY: ConocoPhillips Alaska Inc. (Alpine) TVD Reference: 52' MSL @ 52.000ft (52' MSL) Project: Colville River Unit MD Reference: 52' MSL @ 52.000ft (52' MSL) Site: Alpine CD2 North Reference: True Well: Plan: CD2-21 Survey Calculation Method: Minimum Curvature Well bore: Plan: CD2-21 Design: Plan: CD2-21 (wp06) Planned Survey Mct8sured Vertical Vertical Dogleg Build Turn Dctpth Inclination Azimuth Dctpth +N/-S +E/-W Section Rate Rate Rate (ft) (0) (0) (ft) (ft) (ft) (ft) (0/100ft) (°/1 POft) (0/1POft) 16,300.000 90.017 331.618 7,231.163 8,081.897 -10,370.145 13,089.139 0.00 0.00 0.00 16,400.000 90.017 331.618 7,231.133 8,169.877 -10,417.680 13,184.089 0.00 0.00 0.00 16,500.000 90.017 331.618 7,231.104 8,257.856 -10,465.215 13,279.039 0.00 0.00 0.00 16,600.000 90.017 331.618 7,231.074 8,345.836 -10,512.750 13,373.989 0.00 0.00 0.00 16,700.000 90.017 331.618 7,231.045 8,433.816 -10,560.285 13,468.940 0.00 0.00 0.00 16,800.000 90.017 331.618 7,231.015 8,521.795 -10,607.820 13,563.890 0.00 0.00 0.00 16,900.000 90.017 331.618 7,230.986 8,609.775 -10,655.355 13,658.840 0.00 0.00 0.00 17,000.000 90.017 331.618 7,230.956 8,697.755 -10,702.889 13,753.790 0.00 0.00 0.00 17,100.000 90.017 331.618 7,230.927 8,785.735 -10,750.424 13,848.740 0.00 0.00 0.00 17,200.000 90.017 331.618 7,230.897 8,873.714 -10,797.959 13,943.690 0.00 0.00 0.00 17,300.000 90.017 331.618 7,230.868 8,961.694 -10,845.494 14,038.640 0.00 0.00 0.00 17,400.000 90.017 331.618 7,230.838 9,049.674 -10,893.029 14,133.590 0.00 0.00 0.00 17,500.000 90.017 331.618 7,230.809 9,137.653 -10,940.564 14,228.540 0.00 0.00 0.00 17,600.000 90.017 331.618 7,230.779 9,225.633 -10,988.099 14,323.491 0.00 0.00 0.00 17,700.000 90.017 331.618 7,230.750 9,313.613 -11,035.634 14,418.441 0.00 0.00 0.00 17,800.000 90.017 331.618 7,230.720 9,401.593 -11,083.169 14,513.391 0.00 0.00 0.00 17,900.000 90.017 331.618 7,230.691 9,489.572 -11,130.704 14,608.341 0.00 0.00 0.00 18,000.000 90.017 331.618 7,230.662 9,577.552 -11,178.239 14,703.291 0.00 0.00 0.00 18,100.000 90.017 331.618 7,230.632 9,665.532 -11,225.774 14,798.241 0.00 0.00 0.00 18,200.000 90.017 331.618 7,230.603 9,753.511 -11,273.309 14,893.191 0.00 0.00 0.00 18,300.000 90.017 331.618 7,230.573 9,841.491 -11,320.843 14,988.141 0.00 0.00 0.00 18,400.000 90.017 331.618 7,230.544 9,929.471 -11,368.378 15,083.091 0.00 0.00 0.00 18,500.000 90.017 331.618 7,230.514 10,017.451 -11,415.913 15,178.042 0.00 0.00 0.00 18,600.000 90.017 331.618 7,230.485 10,105.430 -11,463.448 15,272.992 0.00 0.00 0.00 18,700.000 90.017 331.618 7,230.455 10,193.410 -11,510.983 15,367.942 0.00 0.00 0.00 18,800.000 90.017 331.618 7,230.426 10,281.390 -11,558.518 15,462.892 0.00 0.00 0.00 18,900.000 90.017 331.618 7,230.396 10,369.369 -11,606.053 15,557.842 0.00 0.00 0.00 19,000.000 90.017 331.618 7,230.367 10,457.349 -11,653.588 15,652.792 0.00 0.00 0.00 19,100.000 90.017 331.618 7,230.337 10,545.329 -11,701.123 15,747.742 0.00 0.00 0.00 19,200.000 90.017 331.618 7,230.308 10,633.309 -11,748.658 15,842.692 0.00 0.00 0.00 19,300.000 90.017 331.618 7,230.278 10,721.288 -11,796.193 15,937.642 0.00 0.00 0.00 19,400.000 90.017 331.618 7,230.249 10,809.268 -11,843.728 16,032.593 0.00 0.00 0.00 19,500.000 90.017 331.618 7,230.219 10,897.248 -11,891.263 16,127.543 0.00 0.00 0.00 19,600.000 90.017 331.618 7,230.190 10,985.228 -11,938.797 16,222.493 0.00 0,00 0.00 19,700.000 90.017 331.618 7,230.160 11,073.207 -11,986.332 16,317.443 0.00 0.00 0.00 19,800.000 90.017 331.618 7,230.131 11,161.187 -12,033.867 16,412.393 0.00 0.00 0.00 19,900.000 90.017 331.618 7,230.101 11,249.167 -12,081.402 16,507.343 0.00 0.00 0.00 20,000.000 90.017 331.618 7,230.072 11,337.146 -12,128.937 16,602.293 0.00 0.00 0.00 20,100.000 90.017 331.618 7,230.042 11,425.126 -12,176.472 16,697.243 0.00 0.00 0.00 20,200.000 90.017 331.618 7,230.013 11,513.106 -12,224.007 16,792.193 0.00 0.00 0.00 20,244.038 90.017 331,618 7.230.000 11,551.850 -12,244.940 16,834.007 0.00 0.00 0.00 Target (Toe) : 20244.030ft MD, 7230.000ft TVD, (793ft FNL, 3213ft FEL, Sec28-T12N-R4E - 61/8" Open Hole - CD2-21 Toe 12/7/2004 2:53.·35PM Page 7 of 9 COMPASS 2003, 11 Build 48 ORIGINAL .\......- Conocd>hillips SPERRY_SUN HES Planning Report Database: Company: Pr()ject: Site: Well: WellbQre: Design: EDM 2003.11 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine C02 Plan: CD2-21 Plan: CD2-21 Plan: CD2-21 (wp06) Plan: CD2-21 MSL @ 52.000ft (52' MSL) MSL @ 52.000ft (52' MSL) Curvature Targets Target Name - hit/miss target - Shape Dip Angle (0) Dip Dlr. (0) CD2-21 New Heel 0.00 0.00 7,232.000 5,582.997 -9,020.004 5,980,318.330 - plan hits target - Rectangle (sides W6,784.000 H200.000 00.000) 362,780.080 70° 21'14.497" N 151° 06' 51.524" W CD2-21 Toe 0.00 358.12 7,230.000 11,551.850 -12,244.940 5,986,341.000 359,658.000 70022'13.154"N 151°08'26.074"W - Point Measured Depth (ft) 3,123.602 13,339.000 20,244.030 Vertical Depth (ft) 2,390.000 95/8" Csg Pt@ 3124' MD 7,228.250 7" Csg Pt @ 13339' MD 7,230.000 61/8" Open Hole C~slng Points 9-5/8 7 6-1/8 12-1/4 8-112 6-1/8 3,147.994 2,402.000 C-30 0.00 3,904.167 2,774.000 C-20 0.00 6,069.017 3,839.000 K-3 Marker 0.00 6,473.529 4,038.000 Basal K-3 Sand 0.00 6,526.380 4,064.000 K-2 Marker 0.00 6,705.259 4,152.000 Base K-2 Cycle 0.00 8,847.749 5,206.000 Albian 97 0.00 10,240.164 5,891.000 Albian 96 0.00 12,183.447 6,847.000 HRZ 0.00 12,522.650 7,012.000 Base HRZ 0.00 12,646.826 7,065.000 K-1 Marker 0.00 12,758.779 7,107.000 Kuparuk Fm 0.00 12,915.195 7,156.000 LC U-Miluveach 0.00 13,005.731 7,179.000 Miluveach A 0.00 13,070.628 7,193.000 Alpine 0 0.00 13,148.424 7,207.000 Alpine C 0.00 12/7/2004 2:53:35PM Page 8 of 9 COMPASS 2003.11 Build 48 ORIGINAL 300 GD2-18 f - - :AJ ............ G) ...-- .:2: 270 ::r::> r- Northing Easting !';-;:-~tudB ConocoPhillips Alaska Inc. Engineering Alpine Ground level: 0.000 Calculation Method: MininumCurvature Error System: ISCWSA Scan Method: Trav. Cylinder North Error Suñace: Elliptical Conic Warning Method: Rules Based 36 300 300 400 400 500 500 750 750 - 1000 1000 1250 1250 1500 1500 2000 - 2000 2500 . CD2-19 2500 3000 . 90 3000 3500 3500 4000 4000 5000 5000 6000 , , 6000 -- 7000 I CD2-22 7000 8000 8000 9000 9000 10000 ÙÒ" 10000 11000 \ ~ 11000 12000 \ ~ 12000 13000 \ 13000 14000 o 14000 15000 15000 16000 16000 17000 17000 18000 l_ - - - - - - - I CD2-20 I - - - - -ICD2-16! 60 CD2-29 CD2-27 ICD2-31 I 180 Travelling Cylinder Azimuth (TFO+AZI) [0] vs Centre to Centre Separation [50 ftJin] SURVEY PROGRAM Date: 2004-12-07'1'00:00:00 Validated: Yes Version: 11.000 Depth From 36.100 1125.000 Depth To SurveylPlan 1125.000 Plan: CDZ-21 (wp06) 20244.038 Plan: CD2-21 (wp06) Tool CB-GYRO-SS MWD+IFR-AK-CAZrSC From Colour To MD ANTI-COLLlSION SETTINGS Interpolation Method: MD + Stations Interval: 25ft Stations Depth Range From: 36.1 00 To 20244.038 Reference: Plan: CD2-21 (wp06) Maximum Range: 2282.3 ft Scanned from Surface to TD 270 _ J CD2-19 l CD2-20 I 90 180 Travelling Cylinder Azimuth (TFO+AZI) [0) vs Centre to Centre Separation [10 ftJin) (7)2-21 (H'lJ06) AjJ]JrOvef/ Plan ~/ / :·~-Ph·" .'., '·11·' Conceo' ..'.. .'I,.lps ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine C02 Plan: C02-21 Plan: C02-21 Plan: C02-21 (wp06) Travelling Cylinder Report 07 December, 2004 n R't~1 f\f A I ~/ ConocoPhillips Company: Project: Reference Site: Site Error: Reference Well: Well Error: Reference Wellbore Reference Design: Reference ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine CD2 O.OOOft Plan: CD2-21 O.OOOft Plan: CD2-21 Plan: CD2-21 (wp06) Plan: CD2-21 (wp06) SPERRY_SUN HES Anticollision Report local Co-ordinateReference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: OffsetTVD Reference: Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD + Stations Interval 25.000ft Error Model: Depth Range: Unlimited Scan Method: Results Limited by: Maximum center-center distance of 2,282.298ft Error Surface: Warning levels evaluated at: 0.00 Sigma Survey Tool Program From (ft) 36.100 1,125.000 12/7/2004 3: 11: 50PM Date 12/7/2004 To (ft) Survey (Wellbore) Tool Name 1,125.000 Plan: CD2-21 (wp06) (Plan: CD2-21) 20,244.038 Plan: CD2-21 (wp06) (Plan: CD2-21) CB-GYRO-SS MWD+IFR-AK-CAZ-SC Well Plan: CD2-21 52' MSL @ 52.000ft (52' MSL) 52' MSL @ 52.000ft (52' MSL) True Minimum Curvature 1.00 sigma EDM 2003.11 Single User Db Offset Datum ISCWSA Trav. Cylinder North Elliptical Conic Description Camera based gyro single shot MWD+IFR AK CAZ SCC CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 2 of 349 COMPASS 2003.11 Build 48 (ì þ'~1 ¡~ I ;f\~f ì]J\') ConocriPhillips Company: pròject: RefðrenceSlte: Site Error: RefenmceW(lII: WellError: Refer(llÌce Wellbore R(lference D.eslgn: Summary ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine C02 O.OOOft Plan: C02-21 O.OOOft Plan: C02-21 Plan: C02-21 (wp06) $Ite Name Offset Well· Wellbore. -Design 12/7/2004 3:11:50PM SPERRY_SUN HES Anticollision Report Plan: CD2-21 MSL @ 52.000ft (52' MSL) MSL @ 52.000ft (52' MSL) CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 3 of 349 COMPASS 2003.11 Build 48 ORIGINAL ~/ SPERRY - SUN HES ConocoPhillips Anticollision Report Company: ConocoPhillips Alaska Inc. (Alpine) I.ocal Co-ordinateReference: Well Plan: C02-21 Project: Colville River Unit TVDReffmmce: 52' MSL @ 52.000ft (52' MSL) Reference Site: Alpine CO2 MD Reference: 52' MSL @ 52.000ft (52' MSL) Site Error: O.OOOft North Reference: True Refarence Well: Plan: C02-21 SurveyCalculatloo Method: Minimum Curvature Well Error; O.OOOft Outputerror$are at 1.00 sigma Reference Wè1lbore Plan: C02-21 Databa$e: EOM 2003.11 Single User Db Reference Design: Plan: C02-21 (wp06) Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No.Go Allowable Mea$ured Measured C.entre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well· Wellbore . Design (ft) (ft) (ft) (ft) Alpine CD2 C02-05 - Plan: C02-05 - C02-05 (Rig Surveys) 1,533.884 1,525.000 56.277 25.86 30.413 Pass - Major Risk C02-06 - C02-06 - C02-06 199.293 200.000 150.769 3.99 146.776 Pass - Major Risk C02-07 - C02-07 - C02-07 149.220 150.000 140.970 2.94 138.029 Pass - Major Risk C02-07 - C02-07PB1 - C02-07PB1 149.220 150.000 140.970 2.94 138.029 Pass - Major Risk C02-07 - C02-07PB2 - C02-07PB2 149.220 150.000 140.970 2.94 138.029 Pass - Major Risk C02-08 - C02-08 - C02-08 249.831 250.000 130.895 5.13 125.765 Pass - Major Risk C02-09 - Plan: C02-09 - C02-09 (Rig Surveys) 275.368 275.000 119.784 4.89 114.891 Pass - Major Risk C02-10 - C02-10 - C02-10 499.998 500.000 109.379 8.66 100.715 Pass - Major Risk C02-10 - C02-10PB1 - C02-10PB1 499.998 500.000 109.379 8.70 100.679 Pass - Major Risk C02-12 - C02-12 - C02-12 325.287 325.000 90.303 6.22 84.083 Pass - Major Risk C02-13 - C02-13 - C02-13 274.645 275.000 81.117 5.61 75.510 Pass - Major Risk C02-13 - C02-13PB1 - C02-13PB1 274.645 275.000 81.117 5.61 75.510 Pass - Major Risk C02-13 - C02-13PB2 - C02-13PB2 274.645 275.000 81.117 5.61 75.510 Pass - Major Risk C02-14 - C02-14 - C02-14 473.749 475.000 69.950 8.12 61.828 Pass - Major Risk C02-15 - C02-15 - C02-15 624.046 625.000 61.766 11.78 49.989 Pass - Major Risk C02-15 - C02-15PB1 - C02-15PB1 624.046 625.000 61.766 11.78 49.989 Pass - Major Risk C02-15 - C02-15PB2 - C02-15PB2 624.046 625.000 61.766 11.78 49.989 Pass - Major Risk C02-16 - C02-16 - C02-16 399.231 400.000 50.811 7.14 43.668 Pass - Major Risk C02-16 - C02-16 (Sag) - C02-16 (Sag) 399.242 400.000 50.782 6.88 43.907 Pass - Major Risk C02-18 - CD2-18 - CD2-18 625.355 625.000 33.637 12.99 20.643 Pass - Major Risk C02-18 - CD2-18PB1 - CD2-18PB1 625.355 625.000 33.637 12.99 20.643 Pass - Major Risk CD2-19 - CD2-19 - CD2-19 374.471 375.000 19.679 6.43 13.251 Pass - Major Risk C02-20 - C02-20 - C02-20 274.475 275.000 11 .424 5.36 6.062 Pass - Major Risk C02-22 - C02-22 - C02-22 299.491 300.000 10.887 5.07 5.817 Pass - Major Risk C02-23 - C02-23 - C02-23 698.717 700.000 16.898 12.42 4.479 Pass - Major Risk CO~23-C02~3PB1-CO~23PB1 698.717 700.000 16.898 12.42 4.479 Pass - Major Risk C02-24 - C02-24 - C02-24 274.039 275.000 30.469 2.30 28.165 Pass - Minor 1/100 C02-24 - C02-24PB 1 - C02-24PB 1 423.504 425.000 32.356 7.48 24.876 Pass - Major Risk C02-25 - C02-25 - C02-25 373.727 375.000 40.869 6.82 34.049 Pass - Major Risk C02~6-C02~6-C02~6 447.965 450.000 46.977 7.89 39.092 Pass - Major Risk C02-26 - C02-26PB1 - CD2-26PB1 274.971 275.000 51.029 4.86 46.174 Pass - Major Risk CD2-26 - C02-26PB2 - CD2-26PB2 299.999 300.000 51.445 5.32 46.121 Pass - Major Risk C02-27 - C02-27 - CD2-27 199.211 200.000 62.032 4.10 57.930 Pass - Major Risk CD2-28 - CD2-28 - CD2-28 496.732 500.000 70.605 9.70 60.906 Pass - Major Risk CD2-28 - CD2-28PB1 - CD2-28PB1 496.732 500.000 70.605 9.70 60.906 Pass - Major Risk CD2-29 - C02-29 - CD2-29 398.343 400.000 80.304 7.07 73.231 Pass - Major Risk CD2-30 - C02-30 - CD2-30 423.575 425.000 89.618 7.59 82.030 Pass - Major Risk CD2-31 - CD2-31 - CD2-31 1,140.069 1,150.000 96.316 22.63 73.689 Pass - Major Risk CD2-31 - CD2-31 PB 1 - CD2-31 PB 1 1,140.069 1,150.000 96.316 22.63 73.689 Pass - Major Risk CD2-32 - CD2-32 - C02-32 422.636 425.000 111.784 7.43 104.350 Pass - Major Risk C02-32 - C02-32 PB1 - C02-32 PB1 422.636 425.000 111.784 7.54 104.240 Pass - Major Risk C02-33 - C02-33 - C02-33 373.822 375.000 121.359 6.28 115.077 Pass - Major Risk C02-33 - CD2-33A - C02-33A 373.822 375.000 121.359 6.24 115.124 Pass - Major Risk C02-33 - C02-33B - C02-33B 373.822 375.000 121.359 6.28 115.077 Pass - Major Risk C02-34 - C02-34 - C02-34 421.934 425.000 125.310 8.02 117.290 Pass - Major Risk C02-34 - C02-34PB 1 - C02-34PB 1 421.934 425.000 125.310 8.13 117.181 Pass - Major Risk C02-35 - C02-35 - C02-35 362.186 350.000 142.260 6.37 135.886 Pass - Major Risk C02-35 - C02-35A - C02-35A 348.289 350.000 142.038 6.15 135.892 Pass - Major Risk C02-36 - CD 2-36 - CD 2-36 274.255 275.000 149.751 4.94 144.816 Pass - Major Risk CD2-36 - C02-36 PB1 - C02-36 PB 1 274.255 275.000 149.751 4.94 144.816 Pass - Major Risk C02-37 - C02-37 - C02-37 373.415 375.000 161.626 6.76 154.864 Pass - Major Risk C02-38 - C02-38 - C02-38 323.508 325.000 171.187 5.79 165.396 Pass - Major Risk C02-38 - C02-38 (Sag) - C02-38 (Sag) 323.508 325.000 171.187 5.54 165.649 Pass - Major Risk 12/7/2004 3: 11: 50PM CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 4 of 349 COMPASS 2003.11 Build 48 ORIGINAL ConocJPhillips Company: Projøct: Reference Site: Site Errør: RefElrøncøWell: Well Error: Reference Wellbore ReferønceDøsign: ConocoPhillips Alaska Inc. (Alpine) Colvìlle River Unit Alpine CD2 O.OOott Plan: CD2-21 O.OOOtt Plan: CD2-21 Plan: CD2-21 (wp06) Summary Sit~ Name Offset Well-Wellbore-Design Alpine CD2 CD~39-CD2~9-CD2~9 CD2-39 - CD2-39PB1 - CD2-39PB1 CD2-40 - CD2-40 - CD2-40 'CD2-40 - CD2-40PB1 - CD2-40PB1 CD2-41-CD~41-CD2-41 CD~42-CD2-42-CD2-42 ¡ CD2-42 - CD2-42PB 1 - CD2-42PB 1 CD2-43 - CD2-43 - CD2-43 CD2-43-CD~43PB1-CD243PB1 ';CD2-44 - CD2-44 - CD2-44 CD2-45 - CD2-45 - CD2-45 CD2-46 - CD2-46 - CD2-46 Plan: CD2-03 - Plan: CD2-03 - Plan: CD2-03 (wp02 Plan: CD2-04 - Plan: CD2-04 - Plan: CD2-04 (wp02 Plan: CD2-11 - Plan: CD2-11 - Plan: CD2-11 (wp06 Plan: CD2-17 - CD2-17 - CD2-17 Plan: CD2-17 - Plan: CD2-17 X - Plan: CD2-17 X (wp SPERRY_SUN HES Anticollision Report Plan: CD2-21 52' MSL @ 52.000tt (52' MSL) MSL @ 52.000tt (52' MSL) 224.798 225.000 180.697 3.80 176.899 Pass - Major Risk 248.689 250.000 181.112 4.21 176.900 Pass - Major Risk 447.098 450.000 192.150 7.74 184.406 Pass - Major Risk 447.098 450.000 192.150 7.74 184.406 Pass - Major Risk 495.538 500.000 203.703 9.44 194.262 Pass - Major Risk 422.569 425.000 212.114 7.22 204.892 Pass - Major Risk 422.569 425.000 212.114 7.22 204.892 Pass - Major Risk 372.442 375.000 219.700 6.87 212.828 Pass - Major Risk 372.442 375.000 219.700 6.76 212.937 Pass - Major Risk 446.200 450.000 231.782 8.38 223.404 Pass - Major Risk 322.882 325.000 239.436 5.76 233.680 Pass - Major Risk 372.379 375.000 251.614 6.26 245.354 Pass - Major Risk 225.194 225.000 180.200 4.18 176.022 Pass - Major Risk 225.183 225.000 170.086 4.18 165.910 Pass - Major Risk 652.394 650.000 103.502 13.44 90.059 Pass - Major Risk 449.082 450.000 41.794 8.04 33.758 Pass - Major Risk 449.082 450.000 41.794 8.20 33.598 Pass - Major Risk 12/7/2004 3: 11: 50PM CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 5 of 349 COMPASS 2003.11 Build 48 ORIGINAL 4ú.0-: 30.0- 28.0- q:: ~ .S "cd ¡...... cc: '0,·,.. ~ '~~., r/) :::o~ _.0) u mB - .~ Z~ :Þ r- 22.0- 20.0- 18.0- 0.0 I'I I , II -50 0 Plan: Plan: CD2-21 (wp06) (Plan: CD2-211PIan: CD2-21) I I' I I I I' I I I 50 100 II I' I I I 1250 II I I I' I I I II I I I I" I 1350 1400 1450 I I I I I' I II II I I I I" I I o 200 250 300 I I I" I I I I I I I' I 500 5 0 600 I I I I II I' I I I 850 o Measured Depth [ft] CD2-07, CD2-<J7PB I. CD2.iJ7PBt-'ffl- CD2-07. CD2-<J7PB2. CD2-<J7PB~ CD2-08, CD2~)8, CD2-<J8 V¡4 C02· 10, CD2-1O. cm-Io V7 - CD2-1O. CD2-IOPB I. CD2·IOPBt-'ffl- CD2-12. CD2·12. cm-12 V7 Co2· 13, CD2-13. CO2· 13 VI CD2-I5, CD2-IS. CD2-I.'> V3 - C02-IS, CD1~ 15PB 1, CD2~ 15PB' "'Y' - CD2-15, CD2-15PB2, C02- I SPB:.:: ,V2 CD2-lb, CD2·16 (Sag), CD2-16 (~:h"'SlVOCD2·16, CD2·t 6, CD1~ 16 V7 CD2·I7, CD2-17, CD2-17 YO CD2-! It CD2-18, C02-18 VI? CD2-22. CD2-22. CD2·22 VI CD2-23. CD2-23. CD2-2] V2 CD2·23. CD2-23PBI, CD2·2]PB·¡--VH CD2-24. CD2-24, CD2-24 VO -"'- CD2-24. CD2-24PBI, CD2-24PB; ...; CD2-25. CD2-25. CD2-25 VI CD2·26. CD2-26. CD2-26 V4 CD2-l8. CD2-l8, CD2-2R V3 CD1-28, CD2-28PBl. CD2-28PBi-¥i-:1 CD2·29, CD2-29. CD2-29 VI - C01-30, C02-30, CD2~30 V31 C02-31. C02-31. CD2·31 V7 CD2-31. CD2-3IPBI. CD2-31PBr,\l4-. CD2-32. CD2-32 POI. C02-32 PSI VO CD2-33. CD2-33B, CD2-JJB VI CD2·34. CD2·34. CD2-34 V3 ---- CD2-34. CD2-34PBI. CD2·34Pß-f-'A"· CD2-35, CD2-35. CD2-35 V¡ CD2-35. CD2-35A, CD2·35A VI CD2-36. CD 2·36. CD 2·36 V2 - CD2·36. CD2·36 PBI. CD2·36 PBI VII CD2-39. CD2-39. CD2-39 V\ CD2-39. CD2-39PBL CD2-3I)PBi-Y{t- CD2-40. C02-40. ('02-40 V9 C02-40. CD2-40PBI. CD2-40Pß: \'::) C02-41. C02-41. ('02-41 V9 ('02·42. C02-42, ('D2-42 VO CD2-42. C0242PB1. C02-42£>£31 VO C02-45. C02-45. C01-45 V':>; C02-46. CO]-4Ó. C02-4{' V~ CD2-47. C02-47. C02-47 \'2 Plan: C02-03. Plan: CD2-03. Plan. ~'~2-0.:PÞrpQ)!.84. Plan: C02-04, Plan. C8>Ü4~QY45, Plan: C02-05. CDNt5-tRjgf9.am-é.,j.&~~. Pian: CD2-ü<r C02-Hi) (Ri~ ------- "- G ConocoPhillips Alaska Inc. Colville River Unit Alpine CD2 Plan: CD2-21 Plan: CD2-21 Plan: Plan: CD2-21 (wp06) Sperry-Sun Combo Report 07 December, 2004 Local Coordinate Origin: Centered on Well Plan: CD2-21 Viewing Datum: 52' MSL @ 52.000ft (52' MSL) TVDs to System: N North Reference: True Unit System: API - US Survey Feet ORIGINAL .;'\ ...~~. ¡ Ln ·1 ~~ :;.. .. cc.~.::i ~ I ~ ,,;¡¡ &;... ...i W ~Jf~: .'.~.~ e-.;' ¡ t-·~·F ' 1.. ~"' nÆ I :....-.......; .. ~ :;;-1' ~ ~b' ~~;~ t~..;;Ð", ~ ¡;::...~'::.~~::-:::.-jj\:":.u: ::.···I···nnL" ~onocoPhillips Alaska Inc. (Alpine) HALLIBURTON Colville River Unit - Plan Report for Plan: CD2-21 - Plan: CD2-21 - Plan: CD2-21 (wp06) Measured Sub-System Vertical Local Coordinates Map Coordinates Dogleg Vertical Depth Inclination Azimuth Depth Depth +N/-S +EI·W Northing Easting Rate Section (ft) n (0) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) (ft) 36.100 0.000 0.000 -15.900 36.100 0.000 0.000 5,974,582.280 371,702.510 0.00 0.000 SL (1775'FNL & 1538'FEL, Sec2-T11N-R4E) 100.000 0.000 0.000 48.000 100.000 0.000 0.000 5,974,582.280 371,702.510 0.00 0.000 200.000 0.000 0.000 148.000 200.000 0.000 0.000 5,974,582.280 371,702.510 0.00 0.000 200.100 0.000 270.000 148.100 200.100 0.000 0.000 5,974,582.280 371,702.510 0.00 0.000 Begin Dir @ 2.00DLS: 200.100ft MD,200.100ft TVD 300.000 2.000 270.000 247.980 299.980 0.000 -1.745 5,974,582.310 371,700.765 2.00 1.269 400.000 4.000 270.000 347.838 399.838 0.000 -6.978 5,974,582.399 371,695.533 2.00 5.076 500.000 6.000 270.000 447.452 499.452 0.000 -15.694 5,974,582.549 371,686.820 2.00 11.415 600.000 8.000 270.000 546.702 598.702 0.000 -27.880 5,974,582.757 371,674.636 2.00 20.280 700.000 10.000 270.000 645.465 697.465 0.000 -43.523 5,974,583.025 371,658.997 2.00 31.658 800.000 12.000 270.000 743.623 795.623 0.000 -62.603 5,974,583.351 371,639.922 2.00 45.537 900.000 14.000 270.000 841.055 893.055 0.000 -85.096 5,974,583.736 371,617.433 2.00 61.899 1,000.000 16.000 270.000 937.643 989.643 0.000 -110.977 5,974,584.179 371,591.558 2.00 80.724 1,100.000 18.000 270.000 1,033.269 1,085.269 0.000 -140.213 5,974,584.679 371,562.329 2.00 101.990 Continue Dir @ 4.00 DLS: 1100.01 Oft MD, 1 085.278ft TVD 1,200.000 21.252 276.960 1,127.459 1,179.459 2.197 -173.667 5,974,587.448 371,528.920 4.00 127.832 1,300.000 24.716 282.098 1,219.516 1,271.516 8.778 -212.115 5,974,594.685 371,490.593 4.00 160.314 1,400.000 28.314 286.022 1,308.990 1,360.990 19.709 -255.368 5,974,606.354 371,447.537 4.00 199.278 1,500.000 32.000 289.118 1,395.445 1,447.445 34.939 -303.217 5,974,622.399 371,399.960 4.00 244.534 1,600.000 35.748 291.631 1,478.461 1,530.461 54.393 -355.427 5,974,642.742 371,348.095 4.00 295.861 1,700.000 39.539 293.722 1,557.632 1,609.632 77.976 -411.744 5,974,667.283 371,292.193 4.00 353.009 1,800.000 43.362 295.502 1,632.574 1,684.574 105.573 -471.895 5,974,695.903 371,232.528 4.00 415.700 1,900.000 47.209 297.045 1,702.920 1,754.920 137.050 -535.586 5,974,728.462 371,169.391 4.00 483.628 2,000.000 51.074 298.408 1,768.329 1,820.329 172.253 -602.507 5,974,764.803 371,103.088 4.00 556.463 2,100.000 54.953 299.629 1,828.481 1,880.481 211.012 -672.331 5,974,804.747 371,033.942 4.00 633.850 2,200.000 58.844 300.739 1,883.083 1,935.083 253.136 -744.719 5,974,848.100 370,962.291 4.00 715.411 2,243.286 60.531 301.191 1,904.928 1,956.928 272.364 -776.760 5,974,867.871 370,930.587 4.00 751.912 End Dir, Start Sail @ 60.531: 2243.290ft MD, 1956.930ft TVD 2,300.000 60.531 301.191 1,932.828 1,984.828 297.936 -818.999 5,974,894.160 370,888.795 0.00 800.184 2,400.000 60.531 301.191 1,982.023 2,034.023 343.025 -893.476 5,974,940.513 370,815.106 0.00 885.299 2,500.000 60.531 301.191 2,031.219 2,083.219 388.114 -967.953 5,974,986.866 370,741.417 0.00 970.414 2,600.000 60.531 301.191 2,080.414 2,132.414 433.203 -1,042.430 5,975,033.219 370,667.729 0.00 1,055.529 2,700.000 60.531 301.191 2,129.609 2,181.609 478.292 -1,116.907 5,975,079.572 370,594.040 0.00 1,140.644 2,800.000 60.531 301.191 2,178.804 2,230.804 523.381 -1,191.384 5,975,125.925 370,520.352 0.00 1,225.760 2,900.000 60.531 301.191 2,227.999 2,279.999 568.470 -1,265.861 5,975,172.278 370,446.663 0.00 1,310.875 3,000.000 60.531 301.191 2,277 .194 2,329.194 613.559 -1,340.338 5,975,218.631 370,372.974 0.00 1,395.990 3,100.000 60.531 301.191 2,326.389 2,378.389 658.648 -1,414.815 5,975,264.984 370,299.286 0.00 1,481.105 3,123.602 60.531 301.191 2,338.000 2,390.000 669.290 -1,432.393 5,975,275.924 370,281.894 0.00 1 ,501.193 9·5/8" Csg pt ... Drill out 8-1/2" Hole: 3123.602ft MD, 2390.000ft TVD - 9 5/8" Csg PI 3,147.994 60.531 301.191 2,350.000 2,402.000 680.288 -1,450.560 5,975,287.231 370,263.920 0.00 1,521.955 C-30 3,200.000 60.531 301.191 2,375.584 2,427.584 703.737 1,489.292 5,975,311.337 370,225.597 0.00 1,566.220 3,300.000 60.531 301.191 2,424.779 2,476.779 748.826 -1,563.769 5,975,357.690 370,151.909 0.00 1,651.335 3,400.000 60.531 301.191 2,473.974 2,525.974 793.915 -1,638.246 5,975,404.043 370,078.220 0.00 1,736.450 3,500.000 60.531 301.191 2,523.170 2,575.170 839.004 -1,712.723 5,975,450.396 370,004.532 0.00 1,821.565 3,600.000 60.531 301.191 2,572.365 2,624.365 884.093 -1,787.200 5,975,496.749 369,930.843 0.00 1,906.680 3,700.000 60.531 301.191 2,621.560 2,673.560 929.182 -1,861.677 5,975,543.103 369,857.154 0.00 1,991.795 3,800.000 60.531 301.191 2,670.755 2,722.755 974.271 -1,936.154 5,975,589.456 369,783.466 0.00 2,076.910 3,900.000 60.531 301.191 2,719.950 2,771.950 1,019.361 -2,010.631 5,975,635.809 369,709.777 0.00 2,162.026 3,904.167 60.531 301.191 2,722.000 2,774.000 1,021.239 -2,013.735 5,975,637.740 369,706.706 0.00 2,165.572 C-20 4,000.000 60.531 301.191 2,769.145 2,821.145 1,064.450 -2,085.108 5,975,682.162 369,636.089 0.00 2,247141 4,100.000 60.531 301.191 2,818.340 2,870.340 1,109.539 -2,159.585 5,975,728.515 369,562.400 0.00 2,332.256 4,200.000 60.531 301.191 2,867.535 2,919.535 1,154.628 -2,234.062 5,975,774.868 369,488.712 0.00 2,417.371 4,300.000 60.531 301.191 2,916.730 2,968.730 1,199.717 -2,308.539 5,975,821.221 369,415.023 0.00 2,502.486 4,400.000 60.531 301.191 2,965.925 3,017 .925 1,244.806 -2,383.016 5,975,867.574 369,341.334 0.00 2,587.601 4,500.000 60.531 301.191 3,015.121 3,067.121 1,289.895 -2,457.493 5.975,913.927 369,267.646 0.00 2,672.716 07 December, 2004 - 14:53 Page 2 of 7 COMPASS OR' G 1~~ ,A L ·~ -'- / ConocoPhillips Alaska Inc. (Alpine) HALLIBURTON Colville River Unit Plan Report for Plan: CD2-21 - Plan: CD2-21 - Plan: CD2-21 (wp06) Measured Sub-System Vertical Local Coordinates Map Coordinates Dogleg Vertical Depth Inclination Azimuth Depth Depth +N/-S +EI-W Northing Easting Rate Section (ft) (0) n (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) (ft) 4,600.000 60.531 301.191 3,064.316 3,116.316 1,334.984 -2,531.970 5,975,960.280 369,193.957 0.00 2,757.831 4,700.000 60.531 301.191 3,113.511 3,165.511 1,380.073 -2,606.447 5,976,006.633 369,120.269 0.00 2,842.946 4,800.000 60.531 301.191 3,162.706 3,214.706 1,425.162 -2,680.924 5,976,052.986 369,046.580 0.00 2,928.061 4,900.000 60.531 301.191 3,211.901 3,263.901 1,470.251 -2,755.401 5,976,099.339 368,972.891 0.00 3,013.176 5,000.000 60.531 301.191 3,261.096 3,313.096 1,515.340 -2,829.878 5,976,145.692 368,899.203 0.00 3,098.291 5,100.000 60.531 301.191 3,310.291 3,362.291 1,560.429 -2,904.355 5,976,192.045 368,825.514 0.00 3,183.407 5,200.000 60.531 301.191 3,359.486 3,411.486 1,605.518 :2,978.832 5,976,238.398 368,751.826 0.00 3,268.522 5,300.000 60.531 301.191 3,408.681 3,460.681 1,650.607 -3,053.309 5,976,284.751 368,678.137 0.00 3,353.637 5,400.000 60.531 301.191 3,457.876 3,509.876 1,695.696 -3,127.785 5,976,331.104 368,604.449 0.00 3,438.752 5,500.000 60.531 301.191 3,507.072 3,559.072 1,740.785 -3,202.262 5,976,377.457 368,530.760 0.00 3,523.867 5,600.000 60.531 301.191 3,556.267 3,608.267 1,785.874 -3,276.739 5,976,423.810 368,457.071 0.00 3,608.982 5,700.000 60.531 301.191 3,605.462 3,657.462 1,830.963 -3,351.216 5,976,470.163 368,383.383 0.00 3,694.097 5,800.000 60.531 301.191 3,654.657 3,706.657 1,876.053 -3,425.693 5,976,516.516 368,309.694 0.00 3,779.212 5,900.000 60.531 301.191 3,703.852 3,755.852 1,921.142 -3,500.170 5,976,562.869 368,236.006 0.00 3,864.327 6,000.000 60.531 301.191 3,753.047 3,805.047 1,966.231 -3,574.647 5,976,609.222 368,162.317 0.00 3,949.442 6,069.017 60.531 301.191 3,787.000 3,839.000 1,997.350 -3,626.049 5,976,641.214 368,111.459 0.00 4,008.186 . K-3 Marker 6,100.000 60.531 301.191 3,802.242 3,854.242 2,011.320 -3,649.124 5,976,655.575 368,088.629 0.00 4,034.557 6,200.000 60.531 301.191 3,851.437 3,903.437 2,056.409 -3,723.601 5,976,701.928 368,014.940 0.00 4,119.673 6,300.000 60.531 301.191 3,900.632 3,952.632 2,101.498 -3,798.078 5,976,748.281 367,941.251 0.00 4,204.788 6,400.000 60.531 301.191 3,949.827 4,001.827 2,146.587 -3,872.555 5,976,794.634 367,867.563 0.00 4,289.903 6,473.529 60.531 301.191 3,986.000 4,038.000 2,179.740 -3,927.317 5,976,828.717 367,813.380 0.00 4,352.487 Basal K-3 Sand 6,500.000 60.531 301.191 3,999.023 4,051.023 2,191.676 -3,947.032 5,976,840.987 367,793.874 0.00 4,375.018 6,526.380 60.531 301.191 4,012.000 4,064.000 2,203.570 -3,966.679 5,976,853.215 367,774.435 0.00 4,397.471 'K-2 Marker 6,600.000 60.531 301.191 4,048.218 4,100.218 2,236.765 -4,021.509 5,976,887.340 367,720.186 0.00 4,460.133 6,700.000 60.531 301.191 4,097.413 4,149.413 2,281.854 -4,095.986 5,976,933.693 367,646.497 0.00 4,545.248 6,705.259 60.531 301.191 4,100.000 4,152.000 2,284.225 -4,099.903 5,976,936.131 367,642.622 0.00 4,549.724 Base K-2 Cycle 6,800.000 60.531 301.191 4,146.608 4,198.608 2,326.943 -4,170.463 5,976,980.046 367,572.808 0.00 4,630.363 6,900.000 60.531 301.191 4,195.803 4,247.803 2,372.032 -4,244.940 5,977,026.399 367,499.120 0.00 4,715.478 7,000.000 60.531 301.191 4,244.998 4,296.998 2,417.121 -4,319.417 5,977,072.752 367,425.431 0.00 4,800.593 7,100.000 60.531 301.191 4,294.193 4,346.193 2,462.210 -4,393.894 5,977,119.105 367,351.743 0.00 4,885.708 7,200.000 60.531 301.191 4,343.388 4,395.388 2,507.299 -4,468.371 5,977,165.458 367,278.054 0.00 4,970.823 7,300.000 60.531 301.191 4,392.583 4,444.583 2,552.388 -4,542.848 5,977,211.811 367,204.366 0.00 5,055.939 7,400.000 60.531 301.191 4,441.778 4,493.778 2,597.477 -4,617.325 5,977,258.164 367,130.677 0.00 5,141.054 7,500.000 60.531 301.191 4,490.974 4,542.974 2,642.566 -4,691.802 5,977,304.517 367,056.988 0.00 5,226.169 7,600.000 60.531 301.191 4,540.169 4,592.169 2,687.656 -4,766.279 5,977,350.870 366,983.300 0.00 5,311.284 7,700.000 60.531 301.191 4,589.364 4,641.364 2,732.745 -4,840.756 5,977,397.223 366,909.611 0.00 5,396.399 7,800.000 60.531 301.191 4,638.559 4,690.559 2,777.834 -4,915.233 5,977,443.576 366,835.923 0.00 5,481.514 7,900.000 60.531 301.191 4,687.754 4,739.754 2,822.923 -4,989.710 5,977,489.930 366,762.234 0.00 5,566.629 8,000.000 60.531 301.191 4,736.949 4,788.949 2,868.012 -5,064.187 5,977,536.283 366,688.546 0.00 5,651.744 8,100.000 60.531 301.191 4,786.144 4,838.144 2,913.101 -5,138.664 5,977,582.636 366,614.857 0.00 5,736.859 8,200.000 60.531 301.191 4,835.339 4,887.339 2,958.190 -5,213.141 5,977,628.989 366,541.168 0.00 5,821.974 8,300.000 60.531 301.191 4,884.534 4,936.534 3,003.279 -5,287.618 5,977,675.342 366,467.480 0.00 5,907.089 8,400.000 60.531 301.191 4,933.729 4,985.729 3,048.368 -5,362.095 5,977,721.695 366,393.791 0.00 5,992.204 8,500.000 60.531 301.191 4,982.925 5,034.925 3,093.457 -5,436.572 5,977,768.048 366,320.103 0.00 6,077.320 Beginning point for Pilot Hole: 8500.000 ft MD, 5034.925ftTVD 8,600.000 60.531 301.191 5,032.120 5,084.120 3,138.546 -5,511.049 5,977,814.401 366,246.414 0.00 6,162.435 8,700.000 60.531 301.191 5,081.315 5,133.315 3,183.635 -5,585.526 5,977,860.754 366,172.725 0.00 6,247.550 8,800.000 60.531 301.191 5,130.510 5,182.510 3,228.724 -5,660.003 5,977,907.107 366,099.037 0.00 6,332.665 8,847.749 60.531 301.191 5,154.000 5,206.000 3,250.254 -5,695.565 5,977,929.240 366,063.851 0.00 6,373.306 Albian 97 8,900.000 60.531 301.191 5,179.705 5,231.705 3,273.813 -5,734.480 5,977,953.460 366,025.348 0.00 6,417.780 9,000.000 60.531 301.191 5,228.900 5,280.900 3,318.902 -5,808.956 5,977,999.813 365,951.660 0.00 6,502.895 9,100.000 60.531 301.191 5,278.095 5,330.095 3,363.991 -5,883.433 5,978,046.166 365,877.971 0.00 6,588.010 9,200.000 60.531 301.191 5,327.290 5,379.290 3,409.080 -5,957.910 5,978,092.519 365,804.283 0.00 6,673.125 9,300.000 60.531 301.191 5,376.485 5,428.485 3,454.169 -6,032.387 5,978,138.872 365,730.594 0.00 6,758.240 07 December, 2004 - 14:53 Page 3 of 7 COMPASS ORIGINAL ~onocoPhillips Alaska Inc. (Alpine) HALLIBURTON Colville River Unit Plan Report for Plan: CD2-21 - Plan: CD2-21 - Plan: CD2-21 (wp06) Measured Sub-System Vertical Local Coordinates Map Coordinates Dogleg Vertical Depth Inclination Azimuth Depth Depth +N/.s +EI-W Northing Easting Rate Section (ft) n (0) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) (ft) 9,400.000 60.531 301.191 5,425.680 5,477.680 3,499.258 -6,106.864 5,978,185.225 365,656.905 0.00 6,843.355 9,500.000 60.531 301.191 5,474.876 5,526.876 3,544.348 -6,181.341 5,978,231.578 365,583.217 0.00 6,928.470 9,600.000 60.531 301.191 5,524.071 5,576.071 3,589.437 -6,255.818 5,978,277.931 365,509.528 0.00 7,013.586 9,700.000 60.531 301.191 5,573.266 5,625.266 3,634.526 -6,330.295 5,978,324.284 365,435.840 0.00 7,098.701 9,800.000 60.531 301.191 5,622.461 5,674.461 3,679.615 -6,404.772 5,978,370.637 365,362.151 0.00 7,183.816 9,900.000 60.531 301.191 5,671.656 5,723.656 3,724.704 -6,479.249 5,978,416.990 365,288.463 0.00 7,268.931 10,000.000 60.531 301.191 5,720.851 5,772.851 3,769.793 -6,553.726 5,978,463.343 365,214.774 0.00 7,354.046 10,100.000 60.531 301.191 5,770.046 5,822.046 3,814.882 -6,628.203 5,978,509.696 365,141.085 0.00 7,439.161 10,200.000 60.531 301.191 5,819.241 5,871.241 3,859.971 -6,702.680 5,978,556.049 365,067.397 0.00 7,524.276 10,240.164 60.531 301.191 5,839.000 5,891.000 3,878.081 -6,732.593 5,978,574.666 365,037.800 0.00 7,558.462 Albian 96 10,300.000 60.531 301.191 5,868.436 5,920.436 3,905.060 -6,777.157 5,978,602.402 364,993.708 0.00 7,609.391 10,400.000 60.531 301.191 5,917.631 5,969.631 3,950.149 -6,851.634 5,978,648.755 364,920.020 0.00 7,694.506 10,500.000 60.531 301.191 5,966.827 6,018.827 3,995.238 -6,926.111 5,978,695.108 364,846.331 0.00 7,779.621 10,600.000 60.531 301.191 6,016.022 6,068.022 4,040.327 -7,000.588 5,978,741.461 364,772.642 0.00 7,864.736 10,700.000 60.531 301.191 6,065.217 6,117.217 4,085.416 -7,075.065 5,978,787.814 364,698.954 0.00 7,949.851 10,800.000 60.531 301 .191 6,114.412 6,166.412 4,130.505 -7,149.542 5,978,834.167 364,625.265 0.00 8,034.967 10,900.000 60.531 301.191 6,163.607 6,215.607 4,175.594 -7,224.019 5,978,880.520 364,551.577 0.00 8,120.082 11,000.000 60.531 301.191 6,212.802 6,264.802 4,220.683 -7,298.496 5,978,926.873 364,477.888 0.00 8,205.197 11,100.000 60.531 301.191 6,261.997 6,313.997 4,265.772 -7,372.973 5,978,973.226 364,404.200 0.00 8,290.312 11,200.000 60.531 301.191 6,311.192 6,363.192 4,310.861 -7,447.450 5,979,019.579 364,330.511 0.00 8,375.427 11,300.000 60.531 301.191 6,360.387 6,412.387 4,355.951 -7,521.927 5,979,065.932 364,256.822 0.00 8,460.542 11,400.000 60.531 301.191 6,409.582 6,461.582 4,401.040 -7,596.404 5,979,112.285 364,183.134 0.00 8,545.657 11,500.000 60.531 301.191 6,458.778 6,510.778 4,446.129 -7,670.881 5,979,158.638 364,109.445 0.00 8,630.772 11,600.000 60.531 301.191 6,507.973 6,559.973 4,491.218 -7,745.358 5,979,204.991 364,035.757 0.00 8,715.887 11.700.000 60.531 301.191 6,557.168 6,609.168 4,536.307 -7,819.835 5,979,251.344 363,962.068 0.00 8,801.002 11,800.000 60.531 301.191 6,606.363 6,658.363 4,581.396 -7,894.312 5,979,297.697 363,888.380 0.00 8,886.117 11,900.000 60.531 301.191 6,655.558 6,707.558 4,626.485 -7,968.789 5,979,344.050 363,814.691 0.00 8,971.233 12,000.000 60.531 301.191 6,704.753 6,756.753 4,671.574 -8,043.266 5,979,390.403 363,741.002 0.00 9,056.348 12,100.000 60.531 301.191 6,753.948 6,805.948 4,716.663 -8,117.743 5,979,436.757 363,667.314 0.00 9,141.463 12,183.447 60.531 301.191 6,795.000 6,847.000 4,754.288 -8,179.891 5,979,475.437 363,605.823 0.00 9,212.489 HRZ 12,200.000 60.531 301.191 6,803.143 6,855.143 4,761.752 -8,192.220 5,979,483.110 363,593.625 0.00 9,226.578 12,300.000 60.531 301.191 6,852.338 6,904.338 4,806.841 -8,266.697 5,979,529.463 363,519.937 0.00 9,311.693 12,400.000 60.531 301.191 6,901.533 6,953.533 4,851.930 -8,341.174 5,979,575.816 363,446.248 0.00 9,396.808 12,425.681 60.531 301.191 6,914.167 6,966.167 4,863.509 -8,360.300 5,979,587.719 363,427.324 0.00 9,418.666 . Begin Dir @ 4.00DLS: 12425.700ft MD,6966.177ft TVD 12,500.000 62.464 303.759 6,949.634 7,001.634 4,898.583 -8,415.382 5,979,623.728 363,372.855 4.00 9,482.801 12,522.650 63.064 304.525 6,960.000 7,012.000 4,909.887 -8,432.049 5,979,635.314 363,356.385 4.01 9,502.681 Base H RZ 12,600.000 65.137 307.075 6,993.787 7,045.787 4,950.594 -8,488.466 5,979,676.977 363,300.677 4.00 9,571.653 12,646.826 66.415 308.580 7,013.000 7,065.000 4,976.784 -8,522.191 5,979,703.738 363,267.408 4.00 9,614.157 K-1 Marker 12,700.000 67.881 310.250 7,033.650 7,085.650 5,007.897 -8,560.043 5,979,735.492 363,230.097 4.00 9,663.040 12,758.779 69.523 312.059 7,055.000 7,107.000 5,043.939 -8,601.270 5,979,772.230 363,189.496 4.00 9,717.761 Kuparuk Fm 12,800.000 70.683 313.301 7,069.028 7,121.028 5,070.215 -8,629.763 5,979,798.988 363,161.459 4.00 9,756.517 12.900.000 73.535 316.249 7,099.749 7,151.749 5,137.243 -8,697.286 5,979.867.156 363,095.098 4.00 9,851.629 12,915.195 73.973 316.691 7,104.000 7,156.000 5,147.820 -8,707.334 5,979.877.902 363,085.234 4.01 9,866.196 LCU-Miluveach 13,000.000 76.427 319.111 7,125.663 7,177.663 5,208.654 -8,762.285 5,979,939.663 363,031.336 4.00 9,947.913 13,005.731 76.595 319.275 7,127.000 7,179.000 5,212.872 -8,765.926 5,979,943.943 363,027.767 4.04 9,953.456 Miluveach A 13,070.628 78.490 321.092 7,141.000 7,193.000 5,261.544 -8,806.498 5,979,993.297 362,988.038 4.00 10,016.367 Alpine D 13,100.000 79.350 321.904 7,146.644 7,198.644 5,284.101 -8,824.441 5,980,016.157 362,970.484 3.99 10,044.899 13,148.424 80.776 323.238 7,155.000 7,207.000 5,321.977 -8,853.428 5,980,054.520 362,942.153 4.00 10,091.974 Alpine C 07 December, 2004 - 14.53 Page 4 of 7 COMPASS flRJGtNAL "'-' "- , -- ConocoPhillips Alaska Inc. (Alpine) HALLIBURTON Colville River Unit Plan Report for Plan: CD2-21 - Plan: CD2-21 - Plan: CD2-21 (wp06) Measured Sub-System Vertical local Coordinates Map Coordinates Dogleg Vertical Depth Inclination Azimuth Depth Depth +N/-S +EI-W Northing Easting Rate Section (ft) (0) (0) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) (ft) 13,200.000 82.298 324.643 7,162.590 7,214.590 5,363.217 -8,883.453 5,980,096.264 362,912.840 4.00 10,142.114 13,300.000 85.262 327.345 7,173.423 7,225.423 5,445.615 -8,939.033 5,980,179.594 362,858.682 4.00 10,239.086 13,339.000 86.423 328.393 7,176.250 7,228.250 5,478.554 -8,959.719 5,980,212.880 362,838.564 4.01 10,276.737 7" Csg Pt ... Begin 6-1/S" hole: 13339.000ft MD, 7228.250ft TVD -- Continue Dir -7" 13,400.000 88.237 330.023 7,179.090 7,231.090 5,530.895 -8,990.909 5,980,265.742 362,808.277 4.00 10,335.341 13,459.686 90.017 331.618 7,180.000 7,232.000 5,582.997 -9,020.004 5,980,318.330 362,780.080 4.00 10,392.258 Target (Heel) GeoSteer, 13459.680ft MD, 7231.998ft TVD, (147Sft FNl, 5273ft FEl, ~ 13,500.000 90.017 331.618 7,179.988 7,231.988 5,618.465 -9,039.167 5,980,354.118 362,761.528 0.00 10,430.536 13,600.000 90.017 331.618 7,179.959 7,231.959 5,706.445 -9,086.702 5,980,442.891 362,715.509 0.00 10,525.486 13,700.000 90.017 331.618 7,179.929 7,231.929 5,794.424 -9,134.237 5,980,531.664 362,669.490 0.00 10,620.436 13,800.000 90.017 331.618 7,179.900 7,231.900 5,882.404 -9,181.772 5,980,620.437 362,623.471 0.00 10,715.386 13,900.000 90.017 331.618 7,179.870 7,231.870 5,970.384 -9,229.307 5,980,709.210 362,577.453 0.00 10,810.336 14,000.000 90.017 331.618 7,179.841 7,231.841 6,058.363 -9,276.842 5,980,797.983 362,531.434 0.00 10,905.287 14,100.000 90.017 331.618 7,179.811 7,231.811 6,146.343 -9,324.377 5,980,886.756 362,485.415 0.00 11,000.237 .14,200.000 90.017 331.618 7,179.782 7,231.782 6,234.323 -9,371.912 5,980,975.529 362,439.396 0.00 11,095.187 14,300.000 90.017 331.618 7,179.752 7,231.752 6,322.303 -9,419.447 5,981,064.302 362,393.377 0.00 11,190.137 14,400.000 90.017 331.618 7,179.723 7,231.723 6,410.282 -9,466.982 5,981,153.075 362,347.358 0.00 11,285.087 14,500.000 90.017 331.618 7,179.693 7,231.693 6,498.262 -9,514.516 5,981,241.847 362,301.340 0.00 11,380.037 14,600.000 90.017 331.618 7,179.664 7,231.664 6,586.242 -9,562.051 5,981,330.620 362,255.321 0.00 11,474.987 14,700.000 90.017 331.618 7,179.634 7,231.634 6,674.221 -9,609.586 5,981,419.393 362,209.302 0.00 11,569.937 14,800.000 90.017 331.618 7,179.605 7,231.605 6,762.201 -9,657.121 5,981,508.166 362,163.283 0.00 11,664.887 14,900.000 90.017 331.618 7,179.575 7,231.575 6,850.181 -9,704.656 5,981,596.939 362,117.264 0.00 11,759.838 15,000.000 90.017 331.618 7,179.546 7,231.546 6,938.161 -9,752.191 5,981,685.712 362,071.245 0.00 11,854.788 15,100.000 90.017 331.618 7,179.516 7,231.516 7,026.140 -9,799.726 5,981,774.485 362,025.227 0.00 11,949.738 15,200.000 90.017 331.618 7,179.487 7,231.487 7,114.120 -9,847.261 5,981,863.258 361,979.208 0.00 12,044.688 15,300.000 90.017 331.618 7,179.457 7,231.457 7,202.100 -9,894.796 5,981,952.031 361,933.189 0.00 12,139.638 15,400.000 90.017 331.618 7,179.428 7,231.428 7,290.079 -9,942.331 5,982,040.804 361,887.170 0.00 12,234.588 15,500.000 90.017 331.618 7,179.399 7,231.399 7,378.059 -9,989.866 5,982,129.577 361,841.151 0.00 12,329.538 15,600.000 90.017 331.618 7,179.369 7,231.369 7,466.039 -10,037.401 5,982,218.350 361,795.132 0.00 12,424.488 15,700.000 90.017 331.618 7,179.340 7,231.340 7,554.019 -10,084.936 5,982,307.123 361,749.113 0.00 12,519.438 15,800.000 90.017 331.618 7,179.310 7,231.310 7,641.998 -10,132.470 5,982,395.896 361,703.095 0.00 12,614.389 15,900.000 90.017 331.618 7,179.281 7,231.281 7,729.978 -10,180.005 5,982,484.669 361,657.076 0.00 12,709.339 16,000.000 90.017 331.618 7,179.251 7,231.251 7,817.958 -10,227.540 5,982,573.442 361,611.057 0.00 12,804.289 16,100.000 90.017 331.618 7,179.222 7,231.222 7,905.937 -10,275.075 5,982,662.215 361,565.038 0.00 12,899.239 16,200.000 90.017 331.618 7,179.192 7,231.192 7,993.917 -10,322.610 5,982,750.988 361,519.019 0.00 12,994.189 16,300.000 90.017 331.618 7,179.163 7,231.163 8,081.897 -10,370.145 5,982,839.761 361,473.000 0.00 13,089.139 16,400.000 90.017 331.618 7,179.133 7,231. 133 8,169.877 -10,417.680 5,982,928.534 361,426.982 0.00 13,184.089 16,500.000 90.017 331.618 7,179.104 7,231.104 8,257.856 -10,465.215 5,983,017.307 361,380.963 0.00 13,279.039 16,600.000 90.017 331.618 7,179.074 7,231.074 8,345.836 -10,512.750 5,983,106.080 361,334.944 0.00 13,373.989 16.100.000 90.017 331.618 7,179.045 7,231.045 8,433.816 -10,560.285 5,983,194.853 361,288.925 0.00 13,468.940 16,800.000 90.017 331.618 7,179.015 7,231.015 8,521.795 -10,607.820 5,983,283.626 361,242.906 0.00 13,563.890 16,900.000 90.017 331.618 7,178.986 7,230.986 8,609.775 -10,655.355 5,983,372.399 361,196.887 0.00 13,658.840 17,000.000 90.017 331.618 7,178.956 7,230.956 8,697.755 -10,702.889 5,983,461.172 361,150.869 0.00 13,753.790 17,100.000 90.017 331.618 7,178.927 7,230.927 8,785.735 -10,750.424 5,983,549.945 361,104.850 0.00 13,848.740 17,200.000 90.017 331.618 7,178.897 7,230.897 8,873.714 -10,797.959 5,983,638.718 361,058.831 0.00 13,943.690 17,300.000 90.017 331.618 7,178.868 7,230.868 8,961.694 -10,845.494 5,983,727.490 361,012.812 0.00 14,038.640 17,400.000 90.017 331.618 7,178.838 7,230.838 9,049.674 -10,893.029 5,983,816.263 360,966.793 0.00 14,133.590 17,500.000 90.017 331.618 7,178.809 7,230.809 9,137.653 -10,940.564 5,983,905.036 360,920.774 0.00 14,228.540 17,600.000 90.017 331.618 7,178.779 7,230.779 9,225.633 -10,988.099 5,983,993.809 360,874.756 0.00 14,323.491 17,700.000 90.017 331.618 7,178.750 7,230.750 9,313.613 -11,035.634 5,984,082.582 360,828.737 0.00 14,418.441 17,800.000 90.017 331.618 7,178.720 7,230.720 9,401.593 -11,083.169 5,984,171.355 360,782.718 0.00 14,513.391 17,900.000 90.017 331.618 7,178.691 7,230.691 9,489.572 -11,130.704 5,984,260.128 360,736.699 0.00 14,608.341 18,000.000 90.017 331.618 7,178.662 7,230.662 9,577.552 -11,178.239 5,984,348.901 360,690.680 0.00 14,703.291 18,100.000 90.017 331.618 7,178.632 7,230.632 9,665.532 -11,225.774 5,984,437.674 360,644.661 0.00 14,798.241 18,200.000 90.017 331.618 7,178.603 7,230.603 9,753.511 -11,273.309 5,984,526.447 360,598.642 0.00 14,893.191 18,300.000 90.017 331.618 7,178.573 7,230.573 9,841.491 -11,320.843 5,984,615.220 360,552.624 0.00 14,988.141 18,400.000 90.017 331.618 7,178.544 7,230.544 9,929.471 -11,368.378 5,984,703.993 360,506.605 0.00 15,083.091 18,500.000 90.017 331.618 7,178.514 7,230.514 10,017.451 -11,415.913 5,984,792.766 360,460.586 0.00 15,178.042 18,600.000 90.017 331.618 7,178.485 7,230.485 10,105.430 -11,463.448 5,984,881.539 360,414.567 0.00 15,272.992 18,700.000 90.017 331.618 7,178.455 7,230.455 10,193.410 -11,510.983 5,984,970.312 360,368.548 0.00 15,367.942 07 December, 2004 - 14:53 Page 5of7 COMPASS ORIGINAL nR'G'NA' L " è." . . "'~'" " , ~ .. Ii" COMPASS Page 6 of 7 Origin Origin Start Target Azimuth Type +N/_S +E/-W TVD (0) (ft) (ft) (ft) No Target (Freehand) 313.332 Slot 0.000 0.000 36.100 SL (1775'FNL & 1538'FEL, Sec2-T11N-R4E) Begin Oir @ 2.000LS: 200.1 OOft MO,200.1 OOft TVO Continue Oir @ 4.00 OLS: 1100.010ft MO, 1085.278ft TVO End Oir, Start Sail @ 60.531: 2243.290ft MO, 1956.930ft TVO 9-5/8" Csg Pt... Drill out 8-1/2" Hole: 3123.602ft MO, 2390.000ft TVO Beginning point for Pilot Hole: 8500.000 ft MO, 5034.925 ft TVD Begin Oir @ 4.00DLS: 12425.700ft MD,6966.177ft TVO 7" Csg Pt... Begin 6-1/8" hole: 13339.000ft MO, 7228.250ft TVO - Continue Dir Target (Heel) GeoSteer, 13459.680ft MO, 7231.998ft TVO, (1478ft FNL, 5273ft Target (Toe) : 20244.030ft MO, 7230.000ft TVD, (793ft FNL, 3213ft FEL, Sec28 Comment Local Coordinates +N/-S +E/-W (ft) (ft) 0.000 0.000 0.000 0.000 0.000 -140.216 272.366 -776.763 669.290 -1,432.393 3,093.457 -5,436.572 4,863.518 -8,360.314 5,478.554 -8,959.719 5,582.992 -9,020.000 11,551.843 -12,244.937 Angle Type 07 December, 2004 - 14:53 TO Vertical Section Information Vertical Depth (ft) 36.11 0 200.100 1,085.278 1,956.930 2,390.000 5,034.925 6,966.177 7,228.250 7,231.998 7,230.000 Measured Depth (ft) 36.110 200.100 1,100.010 2,243.290 3,123.602 8,500.000 12,425.700 13,339.000 13,459.680 20,244.030 Plan Annotations Based upon Minimum Curvature type calculations, at a Measured Depth of 20,244.04ft the Bottom Hole Displacement is 16,834.01ft in the Direction of 313.33° (Grid). Measured Sub-System Vertical Local Coordinates Map Coordinates Dogleg Vertical Depth Inclination Azimuth Depth Depth +N/-S +EI-W Northing Easting Rate Section (ft) (0) (0) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) (ft) 18,800.000 90.017 331.618 7,178.426 7,230.426 10,281.390 -11,558.518 5,985,059.085 360,322.529 0.00 15,462.892 18,900.000 90.017 331.618 7,178.396 7,230.396 10,369.369 -11,606.053 5,985,147.858 360,276.511 0.00 15,557.842 19,000.000 90.017 331.618 7,178.367 7,230.367 10,457.349 -11,653.588 5,985,236.631 360,230.492 0.00 15,652.792 19,100.000 90.017 331.618 7,178.337 7,230.337 10,545.329 -11,701.123 5,985,325.404 360,184.473 0.00 15,747.742 19,200.000 90.017 331.618 7,178.308 7,230.308 10,633.309 -11,748.658 5,985,414.177 360,138.454 0.00 15,842.692 19,300.000 90.017 331.618 7,178.278 7,230.278 10,721.288 -11,796.193 5,985,502.950 360,092.435 0.00 15,937.642 19,400.000 90.017 331.618 7,178.249 7,230.249 10,809.268 -11,843.728 5,985,591.723 360,046.416 0.00 16,032.593 19,500.000 90.017 331.618 7,178.219 7,230.219 10,897.248 -11,891.263 5,985,680.496 360,000.398 0.00 16,127.543 19,600.000 90.017 331.618 7,178.190 7,230.190 10,985.228 -11,938.797 5,985,769.269 359,954.379 0.00 16,222.493 19,700.000 90.017 331.618 7,178.160 7,230.160 11,073.207 -11,986.332 5,985,858.042 359,908.360 0.00 16,317.443 19,800.000 90.017 331.618 7,178.131 7,230.131 11,161.187 -12,033.867 5,985,946.815 359,862.341 0.00 16,412.393 19,900.000 90.017 331.618 7,178.101 7,230.101 11,249.167 -12,081.402 5,986,035.588 359,816.322 0.00 16,507.343 20,000.000 90.017 331.618 7,178.072 7,230.072 11,337.146 -12,128.937 5,986,124.361 359,770.303 0.00 16,602.293 20,100.000 90.017 331.618 7,178.042 7,230.042 11,425.126 -12,176.472 5,986,213.133 359,724.284 0.00 16,697.243 20,200.000 90.017 331.618 7,178.013 7,230.013 11,513.106 -12,224.007 5,986,301.906 359,678.266 0.00 16,792.193 20,244.038 90.017 331.618 7,178.000 7,230.000 11,551.850 -12,244.940 5,986,341.000 359,658.000 0.00 16,834.007 Target (Toe) : 20244.030ft MD, 7230.000ft TVD, (793ft FNL, 3213ft FEL, Sec28-T12N Plan Report for Plan: CD2-21 - Plan: CD2-21 - Plan: CD2-21 (wp06) LonocoPhillips Alaska Inc. (Alpine) Colville River Unit HALLIBURTON "~ '- HALLIBURTON ConocoPhillips Alaska Inc. (Alpine) Colville River Unit North Reference Sheet for Alpine CD2 - Plan: CD2-21 - Plan: CD2-21 Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 using datum NAO 1927 (NAOCON CONUS), ellipsoid Clarke 1866 Projection method is Transverse Mercator (Gauss-Kruger) Central Meridian is -150.00°, Longitude Origin:O.OO°, Latitude Origin:O.OO° False Easting: 500,OOO.000ft, False Northing: O.OOOft, Scale Reduction: 0.99991869 Grid Coordinates of Well: 5,974,582.280, 371,702.510 Geographical Coordinates of Well: 70° 20' 19.64" N, 151 ° 02' 27.87" W Grid Convergence at Surface is: -0.98° Magnetic Convergence at surface is: -24.86° (25 August 2004, , BGGM2004) T ^ M Magnetic Model: Date: Declination: I nclinationlDip: Field Strength: BGGM2004 25-Aug-04 23.88° 80.60° 57504 Grid North is 0.98° West of True North (Grid Convergence) Magnetic North is 23.88° East of True North (MagneticDeclination) Magnetic North is 24.86° East of Grid North (MagneticConvergence) To convert a True Direction to a Grid Direction, AddO.98° To convert a Magnetic Direction toa True Direction ,Add 23;88° To convert a Magnetic Direction to a Grid Direction, Add 24.86° 07 December, 2004 - 14:53 Page 7 of 7 ORIGINAL COMPASS GEOLOGIC SUMMARY: 1 (NAP 27) Landing Resp: Jeff Yeaton - 4284 I-ormatlo Z X Y (TVD.SS) Porosity Perm Alpine C 362.942 5.980,054 7,155' 0.19 18 Target 362,780 5.980318 7,180' t Shape: Rectangular as defined in CD2-21WP06 Remarks: 2 (NAP 27) Toe Formatlo n X Alpine A 359.658 Dot Applicable y 5,986,341 z (TVD.SS) Porosity Perm 7,178' 0.18 12 t Shape: Rectangular as defined in CD2-21WP06 Remarks: CD2-21 ø Complete Net Pay Preferred Tar. Angle Approx Stepout: Net Pay Preferred Tar. Angle Approx Stepout: 3 (NAP 27) Dot Applicable Formatlo Z n X Y (TVD.SS) Porosity Perm Net Pay Preferred Tar. Angle Pilot Hole Alpine A 359.321 5,984,551 7.186' 0.18 12 Nechelik 358.589 5.986,054 7.505' t Shape: Nechelik target poiygon detineci in CD2-21BWP03 Remarks: Geologic Progno Formatlo X Responsible: Jeff Yeaton - 4284 Y Z MD Gross (TVD.SS) Thicknes West Sak Permafrost C-40 I C-30 C-20 K-3 Marker Basal 1<-3 Sand K-2 Markel Base K-2 Cycle Alb:an 97 f\lbian 96 HRZ Base HRZ K-1 Marker Kuparuk Fm LCU-MiIL/veach Miluveach A Alpine 0 I Alpine C Alp C above shoe 2,350' 2,722' 3,787 3,986 4.012' 4,100' 5,154' 5.839' 6,795' 6,960' 7,013' 7.055' 7.104' 7,127' 7,141' 7, î55' 24' 5' Approx Step out: ø Net Pay Com plete Net to Gross Remarks: Geologic Discussion: Responsible: Jeff Yeaton - 4284 PI Com plete The Alpine C section expected to be <JpiHoxin"2te:y 3U fi thick near the 12ndlflg point, and to thm rapid,y along 1[18 ¡irBt 2000 feet of thi,' ilOrl70ntal Bedion, ThG we,l wiil then be Bteered inlo the Alpine 1\3 Band reservoir section which is inlerpreted to range in thickness f!'Om 5 to 18 feet The C02-21 PB 1 pilot will provide an elevation and t¡-iÌcknoss point to aid geosteuu-,g tho woHlJore ill the Alpll10 A3 section The well will be stoorod to the landing pOint froen the office, two wellsit" geologists will be employed during the d,'iiling of the horizontal s(;c!on ORrGINAL '~ \.~ SHL C:D2-21 ORIGINAL BHL CD2-21 PBt n R.·~···· Gw ,. N" A L l,.,,/ . .~) ~ ~ . if u . ~/ '- ~Ph" /-1"1' ..~, Conoco ....... .·1..· ips Plan: Plan CD2-21 PB1 (wp03) ConocoPhillips Alaska Inc. Colville River Unit Alpine CD2 Plan: CD2-21 Plan CD2-21 PB1 Standard Planning Report 08 December, 2004 ORIGINAL ConocJÂ,illips DataÞas~: Comp~ny: Project: Site: Well: WellÞore: Design: Project Map System: Geo Datum: Map Zone: Site Site Position: From: Position Uncertainty: - Well SPERRY_SUN HES Planning Report EDM 2003.11 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine CD2 Plan: CD2-21 Plan CD2-21 PB1 Plan CD2-21 PB1 (wp03) Local Co-ordinateRøference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Well Plan: CD2-21 52' MSL @ 52.000ft (52' MSL) 52' MSL @ 52.000ft (52' MSL) True Minimum Curvature Colville River Unit, North Slope Alaska, United States US State Plane 1927 (Exact solution) NAD 1927 (NADCON CONUS) Alaska Zone 04 System Datum: Mean Sea Level Using Well Reference Point Using geodetic scale factor Alpine CD2 Map Northing: Easting: Slot Radius: 5,974,641.66°ft 371,696.240 ft 0" Latitude: Longitude: Grid Convergence: 700 20' 20.225" N 1510 02' 28.083" W -0.98 0 0.000 ft Plan: CD2-21, CD2-21 Slot 0.000 ft 0.000 ft 0,000 ft 5,974,582.280 ft 371,702.510 ft ft Latitude: Longitude: Ground Level: 70020' 19.642" N 151002' 27.870" W 0.000 ft Position Uncertainty W~II Position +N/-S +E/-W WêUbore Magnetic:s pesigr;1 Audit Notes: Ve,sion: Northing: Easting: Wellhead Elevation: Plan CD2-21 PB1 Model.Name Field Strength (nT) Sample Date Declination (0) Dip Angle e) bggm2004 4/22/2004 24.03 80.60 57,491 Plan CD2-21 PB1 (wp03) 2 Tie On Depth: 8,500.000 PLAN Phase: Depth From (TVD) (ft) 36.1 00 0.000 310.506 0.000 8,500.000 60.531 301 .1 91 5,034.925 3,093.457 -5,436.572 0.00 0.00 0.00 0.00 9,175.314 77 .825 312.546 5,274.749 3,472.845 -5,936.438 3.00 2.56 1.68 33.76 17,761.225 77 .825 312.546 7,085.458 9,147.857 -12,119.757 0.00 0.00 0.00 0.00 18,440.107 79.215 333.284 7,222.000 9,675.635 -12,518.322 3.00 0.20 3.05 88.22 CC2-21 PB1 Alpine A 20,230.410 79.215 333.284 7,557.000 11,246.576 -13,308.960 0.00 0.00 0.00 0.00 CC2-21 B Tgt 2 NEW 21,833.667 79.215 333.284 7,857.000 12,653.389 -14,016.993 0.00 0.00 0.00 0.00 12/8/2004 8:55:20AM Page 2 of 6 COMPASS 2003.11 Build 48 ORIGIN'At ~ -' ConocJPhillips SPERRY _SUN HES Planning Report Di\ti\bi\SEI : EDM 2003.11 Single User Db Plan: CD2-21 CO,mpany: ConocoPhillips Alaska Inc. (Alpine) MSL @ 52.000ft (52' MSL) Project: Colville River Unit MSL @ 52.000ft (52' MSL) Site: Alpine CO2 Well: Plan: CD2-21 sûj;;.iêvêálóÜíätidnMtitfi6'd.~···· Minimum Curvature Wellbore: Plan CD2-21 PB1 Design: Plan CD2-21 PB1 (wp03) ----~----..,._- PIé1nned Survey Measured Depth Inclination Azimuth (ft) (0) (0) 8,500.000 60.531 301.191 5,034.925 3,093.457 -5,436.572 6,142.918 0.00 0.00 0.00 8,500.100 60.531 301.191 5,034.974 3,093.502 -5,436.646 6,143.004 0.00 0.00 0.00 Begin Dlr for Pilot Hole @ 3.00DLS: 8500.100ft MD,5034.984ft TVD 8,600.000 63.037 303.061 5,082.203 3,140.324 -5,511.177 6,230.085 3.00 2.51 1.87 8,700.000 65.568 304.849 5,125.563 3,190.661 -5,585.902 6,319.597 3.00 2.53 1.79 8,800.000 68.119 306.567 5,164.885 3,244.328 -5,660.543 6,411.207 3.00 2.55 1.72 8,900.000 70.687 308.224 5,200.063 3,301.180 -5,734.895 6,504.666 3.00 2.57 1.66 9,000.000 73.269 309.829 5,230.999 3,361.059 -5,808.753 6,599.717 3.00 2.58 1.61 9,100.000 75.864 311.392 5,257.609 3,423.803 -5,881.917 6,696.100 3.00 2.59 1.56 9,175.314 77 .825 312.546 5,274.749 3,472.845 -5,936.438 6,769.408 3.00 2.60 1.53 End Dir, Start Sail @ 77.825: 9175.400ft MD, 5274.782ft TVD 9,200.000 77.825 312.546 5,279.955 3,489.162 -5,954.216 6,793.524 0.00 0.00 0.00 9,300.000 77.825 312.546 5,301.044 3,555.258 -6,026.233 6,891.213 0.00 0.00 0.00 9,400.000 77.825 312.546 5,322.133 3,621.355 -6,098.250 6,988.902 0.00 0.00 0.00 9,500.000 77.825 312.546 5,343.223 3,687.452 -6,170.267 7,086.591 0.00 0.00 0.00 9,600.000 77 .825 312.546 5,364.312 3,753.549 -6,242.284 7,184.280 0.00 0.00 0.00 9,700.000 77.825 312.546 5,385.401 3,819.646 -6,314.301 7,281.969 0.00 0.00 0.00 9,800.000 77.825 312.546 5,406.491 3,885.742 -6,386.318 7,379.658 0.00 0.00 0.00 9,900.000 77.825 312.546 5,427.580 3,951.839 -6,458.335 7,477.347 0.00 0.00 0.00 10,000.000 77.825 312.546 5,448.669 4,017.936 -6,530.352 7,575.036 0.00 0.00 0.00 10,100.000 77.825 312.546 5,469.759 4,084.033 -6,602.369 7,672.725 0.00 0.00 0.00 10,200.000 77.825 312.546 5,490.848 4,150.130 -6,674.386 7,770.414 0.00 0.00 0.00 10,300.000 77.825 312.546 5,511.937 4,216.226 -6,746.403 7,868.103 0.00 0.00 0.00 10,400.000 77.825 312.546 5,533.026 4,282.323 -6,818.421 7,965.792 0.00 0.00 0.00 10,500.000 77.825 312.546 5,554.116 4,348.420 -6,890.438 8,063.481 0.00 0.00 0.00 10,600.000 77.825 312.546 5,575.205 4,414.517 -6,962.455 8,161.170 0.00 0.00 0.00 10,700.000 77.825 312.546 5,596.294 4,480.614 -7,034.472 8,258.859 0.00 0.00 0.00 10,800.000 77.825 312.546 5,617.384 4,546.710 -7,106.489 8,356.548 0.00 0.00 0.00 10,900.000 77.825 312.546 5,638.473 4,612.807 -7,178.506 8,454.237 0.00 0.00 0.00 11,000.000 77 .825 312.546 5,659.562 4,678.904 -7,250.523 8,551.926 0.00 0.00 0.00 11,100.000 77.825 312.546 5,680.652 4,745.001 -7,322.540 8,649.615 0.00 0.00 0.00 11,200.000 77.825 312.546 5,701.741 4,811.098 -7,394.557 8,747.304 0.00 0.00 0.00 11,300.000 77 .825 312.546 5,722.830 4,877.194 -7,466.574 8,844.993 0.00 0.00 0.00 11,400.000 77.825 312.546 5,743.920 4,943.291 -7,538.591 8,942.682 0.00 0.00 0.00 11,500.000 77 .825 312.546 5,765.009 5,009.388 -7,610.608 9,040.371 0.00 0.00 0.00 11,600.000 77.825 312.546 5,786.098 5,075.485 -7,682.625 9,138.060 0.00 0.00 0.00 11,700.000 77.825 312.546 5,807.187 5,141.582 -7,754.642 9,235.749 0.00 0.00 0.00 11,800.000 77 .825 312.546 5,828.277 5,207.678 -7,826.659 9,333.438 0.00 0.00 0.00 11,900.000 77 .825 312.546 5,849.366 5,273.775 -7,898.676 9,431.127 0.00 0.00 0.00 12,000.000 77 .825 312.546 5,870.455 5,339.872 -7,970.693 9,528.816 0.00 0.00 0.00 12,100.000 77.825 312.546 5,891.545 5,405.969 -8,042.710 9,626.505 0.00 0.00 0.00 12,200.000 77.825 312.546 5,912.634 5,472.066 -8,114.727 9,724.194 0.00 0.00 0.00 12,300.000 77.825 312.546 5,933.723 5,538.162 -8,186.744 9,821.883 0.00 0.00 0.00 12,400.000 77.825 312.546 5,954.813 5,604.259 -8,258.761 9,919.572 0.00 0.00 0.00 12,500.000 77.825 312.546 5,975.902 5,670.356 -8,330.778 10,017.261 0.00 0.00 0.00 12,600.000 77.825 312.546 5,996.991 5,736.453 -8,402.795 10,114.950 0.00 0.00 0.00 12,700.000 77.825 312.546 6,018.080 5,802.550 -8,474.812 10,212.639 0.00 0.00 0.00 12,800.000 77.825 312.546 6,039.170 5,868.646 -8,546.829 10,310.328 0.00 0.00 0.00 12,900.000 77 .825 312.546 6,060.259 5,934.743 -8,618.847 10,408.017 0.00 0.00 0.00 13,000.000 77 .825 312.546 6,081.348 6,000.840 -8,690.864 10,505.706 0.00 0.00 0.00 13,100.000 77.825 312.546 6,102.438 6,066.937 -8,762.881 10,603.395 0.00 0.00 0.00 13,200.000 77.825 312.546 6,123.527 6,133.034 -8,834.898 10,701.084 0.00 0.00 0.00 _______'!},300.000 __~J.,§'ª__ 312.546 6,144.616 6,199.130 -8,906.915 10,798.773 0.00 0.00 0.00 - 12/8/2004 8:55:20AM Page 3 of 6 COMPASS 2003.11 Build 48 n'R f hI t\f A , ConocJ'Phillips Database: CompóiOY: Project: Site: Well: Wellbore: Design: Plan Annotations EDM 2003.11 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine CD2 Plan: CD2-21 Plan: CD2-21 Plan: CD2-21 (wp06) Measured Depth (ft) 36.110 200.100 1,100.010 2,243.290 3,123.602 8,500.000 12,425.700 13,339.000 13,459.680 20,244.030 12í1/2004 2.·S3:3SPM Vertical Depth (ft) 36.110 200.100 1,085.278 1,956.930 2,390.000 5,034.925 6,966.177 7,228.250 7,231.998 7,230.000 SPERRY_SUN HES Planning Report Local Co-ordinateReference: TVDRéference: MDReference: North Reference: Survey CalculationMethod: Well Plan: CD2-21 52' MSL @ 52.000ft (52' MSL) 52' MSL @ 52.000ft (52' MSL) True Minimum Curvature Local Coordinates +N/-S +E/-W (ft) (ft) 0.000 0.000 0.000 272.366 669.290 3,093.457 4,863.518 5,478.554 5,582.992 11,551.843 0.000 0.000 -140.216 -776.763 -1,432.393 -5,436.572 -8,360.314 -8,959.719 -9,020.000 -12,244.937 Comment SL (1775'FNL & 1538'FEL, Sec2- T11 N-R4E) Begin Dir @ 2.00DLS: 200.100ft MD,200.100ft TVD Continue Dir @ 4.00 DLS: 11 OO.010ft MD, 1 085.278ft TVD End Dir, Start Sail @ 60.531: 2243.290ft MD, 1956.930ft TVD 9-5/8" Csg Pt... Drill out 8-1/2" Hole: 3123.602ft MO, 2390.000ft TVO Beginning point for Pilot Hole: 8500.000 ft MO, 5034.925 ft TVD Begin Oir @ 4.000LS: 12425.700ft MO,6966.177ft TVO 7" Csg Pt ... Begin 6-1/8" hole: 13339.000ft MO, 7228.250ft TVD -- Continue Oil Target (Heel) GeoSteer, 13459.680ft MO, 7231.998ft TVD, (1478ft FNL, 5273ft Target (Toe) : 20244.030ft MO, 7230.000ft TVO, (793ft FNL, 3213ft FEL, Sec28 Page 9 of 9 COMPASS 2003. 11 Build 48 n R I h1 ~"Jl1\ ''-'''' "\.~{ ~/ SPERRY_SUN HES ConocoPhiltips Planning Report Database: EDM 2003.11 Single User Db Company: ConocoPhillips Alaska Inc. (Alpine) Project: Colville River Unit Site: Alpine CO2 Well: Plan: CD2-21 WEillbore: Plan CD2-21 PB1 Design: Plan CD2-21 PB1 (wp03) Planné(tSurvey Measured D4!pth Inclination Azimuth (ft) (0) (0) 13,400.000 77.825 312.546 6,165.706 6,265.227 -8,978.932 10,896.462 0.00 0.00 0.00 13,500.000 77 .825 312.546 6,186.795 6,331.324 -9,050.949 10,994.151 0.00 0.00 0.00 13,600.000 77.825 312.546 6,207.884 6,397.421 -9,122.966 11,091.840 0.00 0.00 0.00 13,700.000 77.825 312.546 6,228.974 6,463.518 -9,194.983 11,189.529 0.00 0.00 0.00 13,800.000 77.825 312.546 6,250.063 6,529.614 -9,267.000 11,287.218 0.00 0.00 0.00 13,900.000 77.825 312.546 6,271.152 6,595.711 -9,339.017 11,384.907 0.00 0.00 0.00 14,000.000 77 .825 312.546 6,292.241 6,661.808 -9,411.034 11,482.596 0.00 0.00 0.00 14,100.000 77.825 312.546 6,313.331 6,727.905 -9,483.051 11,580.285 0.00 0.00 0.00 14,200.000 77.825 312.546 6,334.420 6,794.002 -9,555.068 11,677.973 0.00 0.00 0.00 14,300.000 77.825 312.546 6,355.509 6,860.098 -9,627.085 11,775.662 0.00 0.00 0.00 14,400.000 77.825 312.546 6,376.599 6,926.195 -9,699.102 11,873.351 0.00 0.00 0.00 14,500.000 77 .825 312.546 6,397.688 6,992.292 -9,771.119 11,971.040 0.00 0.00 0.00 14,600.000 77 .825 312.546 6,418.777 7,058.389 -9,843.136 12,068.729 0.00 0.00 0.00 14,700.000 77.825 312.546 6,439.867 7,124.486 -9,915.153 12,166.418 0.00 0.00 0.00 14,800.000 77 .825 312.546 6,460.956 7,190.582 -9,987.170 12,264.107 0.00 0.00 0.00 14,900.000 77 .825 312.546 6,482.045 7,256.679 -10,059.187 12,361.796 0.00 0.00 0.00 15,000.000 77 .825 312.546 6,503.135 7,322.776 -10,131.204 12,459.485 0.00 0.00 0.00 15,100.000 77 .825 312.546 6,524.224 7,388.873 -10,203.221 12,557.174 0.00 0.00 0.00 15,200.000 77.825 312.546 6,545.313 7,454.970 -10,275.238 12,654.863 0.00 0.00 0.00 15,300.000 77.825 312.546 6,566.402 7,521.066 -10,347.256 12,752.552 0.00 0.00 0.00 15,400.000 77.825 312.546 6,587.492 7,587.163 -10,419.273 12,850.241 0.00 0.00 0.00 15,500.000 77.825 312.546 6,608.581 7,653.260 -10,491.290 12,947.930 0.00 0.00 0.00 15,600.000 77 .825 312.546 6,629.670 7,719.357 -10,563.307 13,045.619 0.00 0.00 0.00 15,700.000 77.825 312.546 6,650.760 7,785.454 -10,635.324 13,143.308 0.00 0.00 0.00 15,800.000 77.825 312.546 6,671.849 7,851.550 -10,707.341 13,240.997 0.00 0.00 0.00 15,900.000 77.825 312.546 6,692.938 7,917.647 -10,779.358 13,338.686 0.00 0.00 0.00 16,000.000 77.825 312.546 6,714.028 7,983.744 -10,851.375 13,436.375 0.00 0.00 0.00 16,100.000 77 .825 312.546 6,735.117 8,049.841 -10,923.392 13,534.064 0.00 0.00 0.00 16,200.000 77.825 312.546 6,756.206 8,115.938 -10,995.409 13,631.753 0.00 0.00 0.00 16,300.000 77.825 312.546 6,777.296 8,182.034 -11,067.426 13,729.442 0.00 0.00 0.00 16,400.000 77.825 312.546 6,798.385 8,248.131 -11,139.443 13,827.131 0.00 0,00 0.00 16,500.000 77.825 312.546 6,819.474 8,314.228 -11,211.460 13,924.820 0.00 0.00 0.00 16,600.000 77.825 312.546 6,840.563 8,380.325 -11,283.477 14,022.509 0.00 0.00 0.00 16,700.000 77.825 312.546 6,861.653 8,446.422 -11,355.494 14,120.198 0.00 0.00 0.00 16,800.000 77 .825 312.546 6,882.742 8,512.518 -11,427.511 14,217.887 0.00 0.00 0.00 16,900.000 77.825 312.546 6,903.831 8,578.615 -11,499.528 14,315.576 0.00 0.00 0.00 17,000.000 77.825 312.546 6,924.921 8,644.712 -11,571.545 14,413.265 0.00 0.00 0.00 17,100.000 77.825 312.546 6,946.010 8,710.809 -11,643.562 14,510.954 0.00 0.00 0.00 17,200.000 77.825 312.546 6,967.099 8,776.906 -11,715.579 14,608.643 0.00 0.00 0.00 17,300.000 77 .825 312.546 6,988.189 8,843.002 -11,787.596 14,706.332 0.00 0.00 0.00 17,400.000 77 .825 312.546 7,009.278 8,909.099 -11,859.613 14,804.021 0.00 0.00 0.00 17,500.000 77.825 312.546 7,030.367 8,975.196 -11,931.630 14,901.710 0.00 0.00 0.00 17,600.000 77 .825 312.546 7,051.456 9,041.293 -12,003.647 14,999.399 0.00 0.00 0.00 17,700.000 77 .825 312.546 7,072.546 9,107.390 -12,075.664 15,097.088 0.00 0.00 0.00 17,761.225 77.825 312.546 7,085.458 9,147.857 -12,119.757 15,156.898 0.00 0.00 0.00 Begin Dir @ 3.00DLS: 17761.320ft MD,7085.514ft TVD 17,800.000 77.864 313.733 7,093.623 9,173.776 -12,147.415 15,194.763 2.99 0.10 3.06 17,900.000 77.987 316.798 7,114.545 9,243.236 -12,216.229 15,292.201 3.00 0.12 3.07 18,000.000 78.144 319.860 7,135.229 9,316.312 -12,281.265 15,389.115 3.00 0.16 3.06 18,100.000 78.333 322.918 7,155.617 9,392.805 -12,342.347 15,485.242 3.00 0.19 3.06 18,200.000 78.555 325.972 7,175.653 9,472.505 -12,399.305 15,580.316 3.00 0.22 3.05 18,288.252 78.777 328.665 7,193.000 9,545.330 -12,446.022 15,663.140 3.00 0.25 3.05 _._~!:)ine D -. 12/8/2004 8:55:20AM ORfGfNAL COMPASS 2003.11 Build 48 '. -.:-' ConocoPhillips SPERRY_SUN HES Planning Report Databa$e: Company: Project: Site: Wall: Wellbore: Design: EDM 2003.11 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine CD2 Plan: CD2-21 Plan CD2-21 PB1 Plan CD2-21 PB1 (wp03) Local Co-ørdlnate Reference: TVD Røference: MDReference: North Røference: Survey Calculation. Method: Well Plan: CD2-21 52' MSL @ 52.000ft (52' MSL) 52' MSL @ 52.000ft (52' MSL) True Minimum Curvature PlrnnnedSurvey Measûred Depth (ft) Inclination (0) Azimuth (0) Vertical Depth (ft) +N/-S (ft) +EI~W (ft) Vertical Section (ft) Dogleg Rate (0/100ft) Build Rate (0/100ft) Turn Rate (01100ft) 18,300.000 78.808 329.020 7,195.283 9,555.192 -12,451.985 15,674.079 2.98 0.27 3.03 18,360.817 78.978 330.874 7,207.000 9,606.846 -12,481.869 15,730.351 3.00 0.28 3.05 Alpine C 18,400.000 79.093 332.063 7,214.453 9,640.641 -12,500.241 15,766.271 2.99 0.29 3.04 18,440.107 79.215 333.284 7,222.000 9,675.635 -12,518.322 15,802.749 3.01 0.31 3.04 A Sand Target (1) : 18440ft MD, 7222.001ft TVD; (2663ft FNL & 3098ft FEL, Sec28-T12N-R4E - CC2-21 PB1 Alpine A Tgt 1 18,500.000 79.215 333.284 7,233.207 9,728.190 -12,544.772 15,856.996 0.00 0.00 0.00 18,600.000 79.215 333.284 7,251.919 9,815.937 -12,588.935 15,947.568 0.00 0.00 0.00 18,700.000 79.215 333.284 7,270.631 9,903.685 -12,633.097 16,038.140 0.00 0.00 0.00 18,800.000 79.215 333.284 7,289.343 9,991.432 -12,677.259 16,128.713 0.00 0.00 0.00 18,900.000 79.215 333.284 7,308.055 10,079.179 -12,721.421 16,219.285 0.00 0.00 0.00 19,000.000 79.215 333.284 7,326.767 10,166.926 -12,765.583 16,309.858 0.00 0.00 0.00 19,100.000 79.215 333.284 7,345.479 10,254.673 -12,809.746 16,400.430 0.00 0.00 0.00 19,200.000 79.215 333.284 7,364.191 10,342.420 -12,853.908 16,491.002 0.00 0.00 0.00 19,300.000 79.215 333.284 7,382.902 10,430.168 -12,898.070 16,581.575 0.00 0.00 0.00 19,400.000 79.215 333.284 7,401.614 10,517.915 -12,942.232 16,672.147 0.00 0.00 0.00 19,500.000 79.215 333.284 7,420.326 10,605.662 -12,986.394 16,762.720 0.00 0.00 0.00 19,600.000 79.215 333.284 7,439.038 10,693.409 -13,030.557 16,853.292 0.00 0.00 0.00 19,700.000 79.215 333.284 7,457.750 10,781.156 -13,074.719 16,943.864 0.00 0.00 0.00 19,800.000 79.215 333.284 7,476.462 10,868.903 -13,118.881 17,034.437 0.00 0.00 0.00 19,900.000 79.215 333.284 7,495.174 10,956.651 -13,163.043 17,125.009 0.00 0.00 0.00 20,000.000 79.215 333.284 7,513.886 11,044.398 -13,207.205 17,215.582 0.00 0.00 0.00 20,100.000 79.215 333.284 7,532.598 11,132.145 -13,251.368 17,306.154 0.00 0.00 0.00 20,200.000 79.215 333.284 7,551.310 11,219.892 -13,295.530 17,396.726 0.00 0.00 0.00 20,230.410 79.215 333.284 7,557.000 11,246.576 -13,308.960 17,424.269 0.00 0.00 0.00 Target (Nechelik Sand) : 20230.410ft MD, 7557.000ft TVD, (1100ft FNL, 4277ft FEL, Sec28-T12N-R4E - CC2-21 B Tgt 2 NEW BHL 20,300.000 79.215 333.284 7,570.022 11,307.639 -13,339.692 17,487.299 0.00 0.00 0.00 20,400.000 79.215 333.284 7,588.734 11,395.386 -13,383.854 17,577.871 0.00 0.00 0.00 20,500.000 79.215 333.284 7,607.445 11,483.134 -13,428.016 17,668.443 0.00 0.00 0.00 20,600.000 79.215 333.284 7,626.157 11,570.881 -13,472.179 17,759.016 0.00 0.00 0.00 20,700.000 79.215 333.284 7,644.869 11,658.628 -13,516.341 17,849.588 0.00 0.00 0.00 20,800.000 79.215 333.284 7,663.581 11,746.375 -13,560.503 17,940.161 0.00 0.00 0.00 20,900.000 79.215 333.284 7,682.293 11,834.122 -13,604.665 18,030.733 0.00 0.00 0.00 21,000.000 79.215 333.284 7,701.005 11,921.869 -13,648.827 18,121.305 0.00 0.00 0.00 21,100.000 79.215 333.284 7,719.717 12,009.617 -13,692.990 18,211.878 0.00 0.00 0.00 21,200.000 79.215 333.284 7,738.429 12,097.364 -13,737.152 18,302.450 0.00 0.00 0.00 21,300.000 79.215 333.284 7,757.141 12,185.111 -13,781.314 18,393.023 0.00 0.00 0.00 21,400.000 79.215 333.284 7,775.853 12,272.858 -13,825.476 18,483.595 0.00 0.00 0.00 21,500.000 79.215 333.284 7,794.565 12,360.605 -13,869.638 18,574.167 0.00 0.00 0.00 21,600.000 79.215 333.284 7,813.276 12,448.352 -13,913.801 18,664.740 0.00 0.00 0.00 21,700.000 79.215 333.284 7,831.988 12,536.099 -13,957.963 18,755.312 0.00 0.00 0.00 21,800.000 79.215 333.284 7,850.700 12,623.847 -14,002.125 18,845.885 21,833.667 79.215 333.284 7,857.000 12,653.389 -14,016.993 18,876.378 TD (BHL)-21833.600 ft MD, 7856.984 ft TVD; 4975ft FNL & 4984ft FEL, Sec21-T12N-R4E 0.00 0.00 0.00 0.00 0.00 0.00 12/8/2004 8:55:20AM Page 5 of 6 COMPASS 2003.11 Build 48 ORIGINAL .."-.. ./ Conoc<fPhillips DataÞas,: COf1}pany: Projeêt: Site: Well: WellÞöre: Design: Tiirgøts Tj~r~e.· Name , . ol.tlrriisst;¡rget ~Sl'Iape CC2-21B Tgt 2 NEW I: - plan hits target - Polygon NE Corner NW Corner SW Corner SE Corner CC2-21 PB1 Alpine A' - plan hits target - Point C;aslngPo.lnts EOM 2003.11 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine C02 Plan: CD2-21 Plan CD2-21 PB1 Plan C02-21 PB1 (wp03) <~" SPERRY_SUN HES Planning Report Plan: C02-21 MSL @ 52.000ft (52' MSL) MSL @ 52.000ft (52' MSL) True Curvature DlpAl1gle Dip Dir. TVD (0) (0) (ft) 0.00 0.00 7,557.000 11,246.576 -13,308.960 5,986,054.000 358,589.000 70° 22' 10.134" N 151008' 57.184" W 94.493 80.555 5,986,132.92 358,684.85 -44.515 79.176 5,986,133.92 358,545.85 -45.315 -166.893 5,985,887.92 358,540.84 54.644 -163.182 5,985,889.92 358,640.84 0.00 0.00 7,222.000 9,675.635 -12,518.322 5,984,469.890 359,352.580 70021' 54.698" N 151008' 33.979" W Measured D~pth (ft) 3,123.602 Vertical Depto (ft) 2,390.000 95/8" Csg Pt @ 3124' MO Alpine D Alpine C 9-5/8 12-1/4 0.00 0.00 8,500.100 9,175.400 17,761.320 18,440.100 20,230.410 21,833.600 12/8/2004 8:55:20AM 5,034.974 5,274.767 7,085.478 7,221.999 7,557.000 7,856.987 3,093.502 3,472.902 9,147.920 9,675.630 11,246.576 12,653.330 -5,436.646 -5,936.500 -12,119.825 -12,518.319 -13,308.959 -14,016.963 Begin Oir for Pilot Hole @ 3.00DLS: 8500.100ft MO,5034.984ft TVD End Oir, Start Sail @ 77.825: 9175.400ft MO, 5274.782ft TVD Begin Dir@ 3.00DLS: 17761.320ft MO,7085.514ft TVD A Sand Target (1) : 18440ft MO, 7222.001ft TVD; (2663ft FNL & 3098ft FEL, Se Target (Nechelìk Sand) : 20230.41 Oft MD, 7557.000ft TVD, (1100ft FNL, 4277ft TO (BHL)-21833.600 ft MD, 7856.984 ft TVD; 4975ft FNL & 4984ft FEL, Sec21- Page 6 of 6 COMPASS 2003.11 Build 48 ORIGINAL o ConocoPhillips Alaska Inc. Colville River Unit Alpine CD2 Plan: CD2-21 Plan CD2-21 PB1 Plan: Plan CD2-21 PB1 (wp03) Sperry-Sun Combo Report 07 December, 2004 Local Coordinate Origin: Viewing Datum: TVDs to System: North Reference: Unit System: Centered on Well Plan: CD2-21 52' MSL @ 52.000ft (52' MSL) N True API - US Survey Feet n R·· , G I N A L \.J '> I '~ "'--'" ConocoPhillips Alaska Inc. (Alpine) HALLIBURTON Colville River Unit Plan Report for Plan: CD2-21 - Plan CD2-21 PB1 - Plan CD2-21 PB1 (wp03) Measured Sub-8ystem Vertical Local Coordinates Map Coordinates Dogleg Vertical Depth Inclination Azimuth Depth Depth +N/-8 +EI-W Northing Easting Rate Section (ft) (0) (0) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) (ft) 8,500.000 60.531 301.191 4,982.925 5,034.925 3,093.457 -5,436.572 5,977,768.048 366,320.103 0.00 6,142.918 8,500.100 60.531 301.191 4,982.974 5,034.974 3,093.502 -5,436.646 5,977,768.094 366,320.029 0.00 6,143.004 Begin Dir for Pilot Hole @ 3.00DLS: 8500.100ft MD,5034.984ft TVD 8,600.000 63.037 303.061 5,030.203 5,082.203 3,140.324 -5,511.177 5,977,816.181 366,246.316 3.00 6,230.085 8,700.000 65.568 304.849 5,073.563 5,125.563 3,190.661 -5,585.902 5,977,867.784 366,172.469 3.00 6,319.597 8,800.000 68.119 306.567 5,112.885 5,164.885 3,244.328 -5,660.543 5,977,922.716 366,098.763 3.00 6,411.207 8,900.000 70.687 308.224 5,148.063 5,200.063 3,301.180 -5,734.895 5,977,980.827 366,025.401 3.00 6,504.666 9,000.000 73.269 309.829 5,178.999 5,230.999 3,361.059 -5,808.753 5,978,041.957 365,952.584 3.00 6,599.717 9,100.000 75.864 311.392 5,205.609 5,257.609 3,423.803 -5,881.917 5,978,105.938 365,880.511 3.00 6,696.100 9,175.314 77 .825 312.546 5,222.749 5,274.749 3,472.845 -5,936.438 5,978,155.901 365,826.841 3.00 6,769.408 End Dir, Start Sail @ 77.825: 9175,400ft MD, 5274.782ft TVD 9,200.000 77.825 312.546 5,227.955 5,279.955 3,489.162 -5,954.216 5,978.172.519 365,809.346 0.00 6,793.524 9,300.000 77 .825 312.546 5,249.044 5,301.044 3,555.258 -6,026.233 5,978,239.833 365,738.476 0.00 6,891.213 9,400.000 77.825 312.546 5,270.133 5,322.133 3,621.355 -6,098.250 5,978,307.146 365,667.607 0.00 6,988.902 9,500.000 77.825 312.546 5,291.223 5,343.223 3,687.452 -6,170.267 5.978,374.460 365,596.737 0.00 7,086.591 9,600.000 77.825 312.546 5,312.312 5,364.312 3.753.549 -6,242.284 5,978,441.774 365.525.867 0.00 7,184.280 9,700.000 77.825 312.546 5,333.401 5,385.401 3,819.646 -6,314.301 5,978,509.088 365,454.997 0.00 7,281.969 9,800.000 77.825 312.546 5,354.491 5,406.491 3,885.742 -6,386.318 5,978,576.402 365,384.128 0.00 7,379.658 9,900.000 77.825 312.546 5,375.580 5,427.580 3,951.839 -6,458.335 5,978,643.716 365,313.258 0.00 7,477.347 10,000.000 77.825 312.546 5,396.669 5,448.669 4,017.936 -6,530.352 5,978,711.030 365,242.388 0.00 7,575.036 10,100.000 77.825 312.546 5,417.759 5,469.759 4,084.033 -6,602.369 5,978,778.344 365,171.518 0.00 7,672.725 10,200.000 77.825 312.546 5,438.848 5,490.848 4,150.130 -6,674.386 5,978,845.658 365,100.648 0.00 7,770.414 10,300.000 77.825 312.546 5,459.937 5,511.937 4,216.226 -6,746.403 5,978,912.972 365,029.779 0.00 7,868.103 10,400.000 77.825 312.546 5,481.026 5,533.026 4,282.323 -6,818.421 5,978,980.285 364,958.909 0.00 7,965.792 10,500.000 77.825 312.546 5,502.116 5,554.116 4,348.420 -6,890.438 5,979,047.599 364,888.039 0.00 8,063.481 10,600.000 77.825 312.546 5,523.205 5,575.205 4,414.517 -6,962.455 5,979,114.913 364,817.169 0.00 8,161.170 10,700.000 77.825 312.546 5,544.294 5,596.294 4,480.614 -7,034.472 5,979,182.227 364,746.299 0.00 8,258.859 10,800.000 77.825 312.546 5,565.384 5,617.384 4,546.710 -7,106.489 5,979,249.541 364,675.430 0.00 8,356.548 10,900.000 77 .825 312.546 5,586.473 5,638.473 4,612.807 -7,178.506 5,979,316.855 364,604.560 0.00 8,454.237 11,000.000 77 .825 312.546 5,607.562 5,659.562 4,678.904 -7,250.523 5,979,384.169 364,533.690 0.00 8,551.926 11,100.000 77 .825 312.546 5,628.652 5,680.652 4,745.001 -7,322.540 5,979,451.483 364,462.820 0.00 8,649.615 11,200.000 77.825 312.546 5,649.741 5,701.741 4,811.098 -7,394.557 5,979,518.797 364,391.951 0.00 8,747.304 11,300.000 77.825 312.546 5,670.830 5,722.830 4,877.194 -7,466.574 5,979,586.111 364,321.081 0.00 8,844.993 11,400.000 77 .825 312.546 5,691.920 5,743.920 4,943.291 -7,538.591 5,979,653.424 364,250.211 0.00 8,942.682 11,500.000 77 .825 312.546 5,713.009 5,765.009 5,009.388 -7,610.608 5,979,720.738 364,179.341 0.00 9,040.371 11,600.000 77 .825 312.546 5,734.098 5,786.098 5,075.485 -7,682.625 5,979,788.052 364,108.471 0.00 9,138.060 11,700.000 77.825 312.546 5,755.187 5,807.187 5,141.582 -7,754.642 5,979,855.366 364,037.602 0.00 9,235.749 11,800.000 77 .825 312.546 5,776.277 5,828.277 5,207.678 -7,826.659 5,979,922.680 363,966.732 0.00 9,333.438 11,900.000 77 .825 312.546 5,797.366 5,849.366 5,273.775 -7,898.676 5,979,989.994 363,895.862 0.00 9,431.127 12,000.000 77.825 312.546 5,818.455 5,870.455 5,339.872 -7,970.693 5,980,057.308 363,824.992 0.00 9,528.816 12,100.000 77.825 312.546 5,839.545 5,891.545 5,405.969 -8,042.710 5,980,124.622 363,754.123 0.00 9,626.505 12,200.000 77.825 312.546 5,860.634 5,912.634 5,472.066 -8,114.727 5,980,191.936 363,683.253 0.00 9,724.194 12,300.000 77 .825 312.546 5,881.723 5,933.723 5,538.162 -8,186.744 5,980,259.250 363,612.383 0.00 9,821.883 " 12,400.000 77 .825 312.546 5,902.813 5,954.813 5,604.259 -8,258.761 5,980,326.563 363,541.513 0.00 9,919.572 12,500.000 77.825 312.546 5,923.902 5,975.902 5,670.356 -8,330.778 5,980,393.877 363,470.643 0.00 10,017.261 12,600.000 77.825 312.546 5,944.991 5,996.991 5,736.453 -8,402.795 5,980,461.191 363,399.774 0.00 10,114.950 12,700.000 77.825 312.546 5,966.080 6,018.080 5,802.550 -8,474.812 5,980,528.505 363,328.904 0.00 10,212.639 12,800.000 77 .825 312.546 5,987.170 6,039.170 5,868.646 -8,546.829 5,980,595.819 363,258.034 0.00 10,310.328 12,900.000 77.825 312.546 6,008.259 6,060.259 5,934.743 -8,618.847 5,980,663.133 363,187.164 0.00 10,408.017 13,000.000 77.825 312.546 6,029.348 6,081.348 6,000.840 -8,690.864 5,980,730.447 363,116.294 0.00 10,505.706 13,100.000 77.825 312.546 6,050.438 6,102.438 6,066.937 -8,762.881 5,980,797.761 363,045.425 0.00 10,603.395 13,200.000 77.825 312.546 6,071.527 6,123.527 6,133.034 -8,834.898 5,980,865.075 362,974.555 0.00 10,701.084 13,300.000 77.825 312.546 6,092.616 6,144.616 6,199.130 -8,906.915 5,980,932.389 362,903.685 0.00 10,798.773 13,400.000 77.825 312.546 6,113.706 6,165.706 6,265.227 -8,978.932 5,980,999.702 362,832.815 0.00 10,896.462 13,500.000 77.825 312.546 6,134.795 6,186.795 6,331.324 -9,050.949 5,981,067.016 362,761.946 0.00 10,994.151 13,600.000 77.825 312.546 6,155.884 6,207.884 6,397.421 -9,122.966 5,981,134.330 362,691.076 0.00 11,091.840 13,700.000 77.825 312.546 6,176.974 6,228.974 6,463.518 -9,194.983 5,981,201.644 362,620.206 0.00 11,189.529 13,800.000 77.825 312.546 6,198.063 6,250.063 6,529.614 -9,267.000 5,981,268.958 362,549.336 0.00 11,287.218 13,900.000 77.825 312.546 6,219.152 6,271.152 6,595.711 -9,339.017 5,981,336.272 362,478.466 0.00 11,384.907 07 December, 2004 - 14:22 Page 2 of 5 COMPASS ORIG\NAL LunocoPhillips Alaska Inc. (Alpine) HALLIBURTON Colville River Unit - Plan Report for Plan: CD2-21 - Plan CD2·21 PB1 - Plan CD2·21 PB1 (wp03) Measured Sub-System Vertical Local Coordinates Map Coordinates Dogleg Vertical Depth Inclination Azimuth Depth Depth +N/-S +E/-W Northing Easting Rate Section (ft) (") (") (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) (ft) 14,000.000 77.825 312.546 6,240.241 6,292.241 6,661.808 -9,411.034 5,981,403.586 362,407.597 0.00 11,482.596 14,100.000 77.825 312.546 6,261.331 6,313.331 6,727.905 -9,483.051 5,981,470.900 362,336.727 0.00 11,580.285 14,200.000 77.825 312.546 6,282.420 6,334.420 6,794.002 -9,555.068 5,981,538.214 362,265.857 0.00 11,677.973 14,300.000 77.825 312.546 6,303.509 6,355.509 6,860.098 -9,627.085 5,981,605.528 362,194.987 0.00 11,775.662 14,400.000 77.825 312.546 6,324.599 6,376.599 6,926.195 -9,699.102 5,981,672.841 362,124.117 0.00 11,873.351 14,500.000 77.825 312.546 6,345.688 6,397.688 6,992.292 -9,771.119 5,981,740.155 362,053.248 0.00 11,971.040 14,600.000 77.825 312.546 6,366.777 6,418.777 7,058.389 -9,843.136 5,981,807.469 361,982.378 0.00 12,068.729 14,700.000 77.825 312.546 6,387.867 6,439.867 7,124.486 -9,915.153 5,981,874.783 361,911.508 0.00 12,166.418 14,800.000 77.825 312.546 6,408.956 6,460.956 7,190.582 -9,987.170 5,981,942.097 361,840.638 0.00 12,264.107 14,900.000 77.825 312.546 6,430.045 6,482.045 7,256.679 -10,059.187 5,982,009.411 361,769.769 0.00 12,361.796 15,000.000 77.825 312.546 6,451.135 6,503.135 7,322.776 -10,131.204 5,982,076.725 361,698.899 0.00 12,459.485 15,100.000 77.825 312.546 6,472.224 6,524.224 7,388.873 -10,203.221 5,982,144.039 361,628.029 0.00 12,557.174 15,200.000 77.825 312.546 6,493.313 6,545.313 7,454.970 -10,275.238 5,982,211.353 361,557.159 0.00 12,654.863 15,300.000 77.825 312.546 6,514.402 6,566.402 7,521.066 -10,347.256 5,982,278.667 361,486.289 0.00 12,752.552 15,400.000 77.825 312.546 6,535.492 6,587.492 7,587.163 -10,419.273 5,982,345.980 361,415.420 0.00 12,850.241 15,500.000 77.825 312.546 6,556.581 6,608.581 7,653.260 -10,491.290 5,982,413.294 361,344.550 0.00 12,947.930 : 15,600.000 77.825 312.546 6,577.670 6,629.670 7,719.357 -10,563.307 5,982,480.608 361,273.680 0.00 13,045.619 15,700.000 77.825 312.546 6,598.760 6,650.760 7,785.454 -10,635.324 5,982,547.922 361,202.810 0.00 13,143.308 15,800.000 77.825 312.546 6,619.849 6,671.849 7,851.550 -10,707.341 5,982,615.236 361,131.941 0.00 13,240.997 15,900.000 77.825 312.546 6,640.938 6,692.938 7,917.647 -10,779.358 5,982,682.550 361,061.071 0.00 13,338.686 16,000.000 77.825 312.546 6,662.028 6,714.028 7,983.744 -10,851.375 5,982,749.864 360,990.201 0.00 13,436.375 16,100.000 77.825 312.546 6,683.117 6,735.117 8,049.841 -10,923.392 5,982,817.178 360,919.331 0.00 13,534.064 16,200.000 77.825 312.546 6,704.206 6,756.206 8,115.938 -10,995.409 5,982,884.492 360,848.461 0.00 13,631.753 16,300.000 77.825 312.546 6,725.296 6,777.296 8,182.034 -11,067.426 5,982,951.806 360,777.592 0.00 13,729.442 16,400.000 77.825 312.546 6,746.385 6,798.385 8,248.131 -11,139.443 5,983,019.119 360,706.722 0.00 13,827.131 16,500.000 77.825 312.546 6,767.474 6,819.474 8,314.228 -11,211.460 5,983,086.433 360,635.852 0.00 13,924.820 16,600.000 77.825 312.546 6,788.563 6,840.563 8,380.325 -11,283.477 5,983,153.747 360,564.982 0.00 14,022.509 16,700.000 77.825 312.546 6,809.653 6,861.653 8,446.422 -11,355.494 5,983,221.061 360,494.112 0.00 14,120.198 16,800.000 77.825 312.546 6,830.742 6,882.742 8,512.518 -11,427.511 5,983,288.375 360,423.243 0.00 14,217.887 16,900.000 77.825 312.546 6,851.831 6,903.831 8,578.615 -11,499.528 5,983,355.689 360,352.373 0.00 14,315.576 17,000.000 77.825 312.546 6,872.921 6,924.921 8,644.712 -11,571.545 5,983,423.003 360,281.503 0.00 14,413.265 17,100.000 77.825 312.546 6,894.010 6,946.010 8,710.809 -11,643.562 5,983,490.317 360,210.633 0.00 14,510.954 17,200.000 77.825 312.546 6,915.099 6,967.099 8,776.906 -11,715.579 5,983,557.631 360,139.764 0.00 14,608.643 17,300.000 77.825 312.546 6,936.189 6,988.189 8,843.002 -11,787.596 5,983,624.945 360,068.894 0.00 14,706.332 17,400.000 77.825 312.546 6,957.278 7,009.278 8,909.099 -11,859.613 5,983,692.258 359,998.024 0.00 14,804.021 17,500.000 77.825 312.546 6,978.367 7,030.367 8,975.196 -11,931.630 5,983,759.572 359,927.154 0.00 14,901.710 17,600.000 77.825 312.546 6,999.456 7,051.456 9,041.293 -12,003.647 5,983,826.886 359,856.284 0.00 14,999.399 17,700.000 77.825 312.546 7,020.546 7,072.546 9,107.390 -12,075.664 5,983,894.200 359,785.415 0.00 15,097.088 17,761.225 77.825 312.546 7,033.458 7,085.458 9,147.857 -12,119.757 5,983,935.413 359,742.025 0.00 15,156.898 Begin Dir @ 3.00DLS: 17761.320ft MD,70S5.514ft TVD 17,800.000 77.864 313.733 7,041.623 7,093.623 9,173.776 -12,147.415 5,983,961.799 359,714.816 2.99 15,194.763 17,900.000 77.987 316.798 7,062.545 7,114.545 9,243.236 -12,216.229 5,984,032.420 359,647.206 3.00 15,292.201 18,000.000 78.144 319.860 7,083.229 7,135.229 9,316.312 -12,281.265 5,984,106.593 359,583.435 3.00 15,389.115 18,100.000 78.333 322.918 7,103.617 7,155.617 9,392.805 -12,342.347 5,984,184.113 359,523.676 3.00 15,485.242 18,200.000 78.555 325.972 7,123.653 7,175.653 9,472.505 -12,399.305 5,984,264.769 359,468.095 3.00 15,580.316 18,288.252 78.777 328.665 7,141.000 7,193.000 9,545.330 -12,446.022 5,984,338.377 359,422.634 3.00 15,663.140 Alpine D 18,300.000 78.808 329.020 7,143.283 7,195.283 9,555.192 -12,451.985 5,984,348.339 359,416.842 2.98 15,674.079 18,360.817 78.978 330.874 7,155.000 7,207.000 9,606.846 -12,481.869 5,984,400.492 359,387.848 3.00 15,730.351 Alpine C 18,400.000 79.093 332.063 7,162.453 7,214.453 9,640.641 -12,500.241 5,984,434.594 359,370.058 2.99 15,766.271 18,440.107 79.215 333.284 7,170.000 7,222.000 9,675.635 -12,518.322 5,984,469.890 359,352.580 3.01 15,802.749 A Sand Target (1) : 18440ft MD, 7222.001ft TVD; (2663ft FNL & 3098ft FEL, Sec28-T 18,500.000 79.215 333.284 7,181.207 7,233.207 9,728.190 -12,544.772 5,984,522.885 359,327.035 0.00 15,856.996 18,600.000 79.215 333.284 7,199.919 7,251.919 9,815.937 -12,588.935 5,984,611.368 359,284.384 0.00 15,947.568 18,700.000 79.215 333.284 7,218.631 7,270.631 9,903.685 -12,633.097 5,984,699.851 359,241.733 0.00 16,038140 18,800.000 79.215 333.284 7,237.343 7,289.343 9,991.432 -12,677.259 5,984,788.334 359,199.082 0.00 16,128.713 18,900.000 79.215 333.284 7,256.055 7,308.055 10,079.179 -12,721.421 5,984,876.816 359,156.431 0.00 16,219.285 19,000.000 79.215 333.284 7,274.767 7,326.767 10,166.926 -12,765.583 5,984,965.299 359,113.781 0.00 16,309.858 07 December, 2004 - 14.22 Page 3 of 5 COMPASS ORIGINAL ORIGINAL COMPASS Page 4 of5 07 December, 2004 - 14:22 Origin Origin Start Target Azimuth Type +NCS +E/-W TVD n (ft) (ft) (ft) No Target (Freehand) 310.506 Slot 0.000 0.000 36.100 User Angle Type Vertical Section Information Begin Dir for Pilot Hole @ 3.00DLS: 8500.100ft MD,5034.984ft TVD End Dir, Start Sail @ 77.825: 9175.400ft MD, 5274.782ft TVD Begin Dir @ 3.00DLS: 17761.320ft MD,7085.514ft TVD A Sand Target (1) : 18440ft MD, 7222.001ft TVD; (2663ft FNL & 3098ft FEL, Se Target (Nechelik Sand) : 20230.410ft MD, 7557.000ft TVD, (1100ft FNL, 4277ft TD (BHL)-21833.600 ft MD, 7856.984 ft TVD; 4975ft FNL & 4984ft FEL, Sec21- Local Coordinates +N/-S +E/-W (ft) (ft) 3,093.502 -5,436.646 3,472.902 -5,936.500 9,147.920 -12,119.825 9,675.630 -12,518.319 11,246.576 -13,308.959 12,653.330 -14,016.963 Vertical Depth (ft) 5,034.974 5,274.767 7,085.478 7,221.999 7,557.000 7,856.987 Measured Depth (ft) 8,500.100 9,175.400 17,761.320 18,440.100 20,230.410 21,833.600 Comment Plan Annotations Based upon Minimum Curvature type calculations, at a Measured Depth of 21,833.67ft the Bottom Hole Displacement is 18,883.44ft in the Direction of 312.0r (Grid). \..../ \ "-'" ConocoPhillips Alaska Inc. (Alpine) HALLIBURTON Colville River Unit Plan Report for Plan: CD2-21 - Plan CD2-21 PB1 - Plan CD2-21 PB1 (wp03) Measured Sub-System Vertical Local Coordinates Map Coordinates Dogleg Vertical Depth Inclination Azimuth Depth Depth +N/-S +EI-W Northing Easting Rate Section (ft) (0) (0) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) (ft) 19,100.000 79.215 333.284 7,293.479 7,345.479 10,254.673 -12,809.746 5,985,053.782 359,071.130 0.00 16,400.430 19,200.000 79.215 333.284 7,312.191 7,364.191 10,342.420 -12,853.908 5,985,142.265 359,028.479 0.00 16,491.002 19,300.000 79.215 333.284 7,330.902 7,382.902 10,430.168 -12,898.070 5,985,230.747 358,985.828 0.00 16,581.575 19,400.000 79.215 333.284 7,349.614 7,401.614 10,517.915 -12,942.232 5,985,319.230 358,943.177 0.00 16,672.147 19,500.000 79.215 333.284 7,368.326 7,420.326 10,605.662 -12,986.394 5,985,407.713 358,900.526 0.00 16,762.720 19,600.000 79.215 333.284 7,387.038 7,439.038 10,693.409 -13,030.557 5,985,496.196 358,857.875 0.00 16,853.292 19,700.000 79.215 333.284 7,405.750 7,457.750 10,781.156 -13,074.719 5,985,584.679 358,815.225 0.00 16,943.864 19,800.000 79.215 333.284 7,424.462 7,476.462 10,868.903 -13,118.881 5,985,673.161 358,772.574 0.00 17,034.437 19,900.000 79.215 333.284 7,443.174 7,495.174 10,956.651 -13,163.043 5,985,761.644 358,729.923 0.00 17,125.009 20,000.000 79.215 333.284 7,461.886 7,513.886 11,044.398 -13,207.205 5,985,850.127 358,687.272 0.00 17,215.582 20,100.000 79.215 333.284 7,480.598 7,532.598 11,132.145 -13,251.368 5,985,938.610 358,644.621 0.00 17,306.154 20,200.000 79.215 333.284 7,499.310 7,551.310 11,219.892 -13,295.530 5,986,027.092 358,601.970 0.00 17,396.726 20,230.410 79.215 333.284 7,505.000 7,557.000 11,246.576 -13,308.960 5,986,054.000 358,589.000 0.00 17,424.269 Target (Nechellk Sand): 20230.410ft MD, 7557.000ft TVD, (1100ft FNL, 4277ft FEL,: . 20,300.000 79.215 333.284 7,518.022 7,570.022 11,307.639 -13,339.692 5,986,115.575 358,559.319 0.00 17,487.299 20,400.000 79.215 333.284 7,536.734 7,588.734 11,395.386 -13,383.854 5,986,204.058 358,516.668 0.00 17,577.871 ; 20,500.000 79.215 333.284 7,555.445 7,607.445 11 ,483.134 -13,428.016 5,986,292.541 358,474.018 0.00 17,668.443 . 20,600.000 79.215 333.284 7,574.157 7,626.157 11,570.881 -13,472.179 5,986,381.023 358,431.367 0.00 17,759.016 20,700.000 79.215 333.284 7,592.869 7,644.869 11,658.628 -13,516.341 5,986,469.506 358,388.716 0.00 17,849.588 20,800.000 79.215 333.284 7,611.581 7,663.581 11,746.375 -13,560.503 5,986,557.989 358,346.065 0.00 17,940.161 20,900.000 79.215 333.284 7,630.293 7,682.293 11,834.122 -13,604.665 5,986,646.472 358,303.414 0.00 18,030.733 21,000.000 79.215 333.284 7,649.005 7,701.005 11,921.869 -13,648.827 5,986,734.954 358,260.763 0.00 18,121.305 21,100.000 79.215 333.284 7,667.717 7,719.717 12,009.617 -13,692.990 5,986,823.437 358,218.112 0.00 18,211.878 21,200.000 79.215 333.284 7,686.429 7,738.429 12,097.364 -13,737.152 5,986,911.920 358,175.461 0.00 18,302.450 21,300.000 79.215 333.284 7,705.141 7,757.141 12,185.111 -13,781.314 5,987,000.403 358,132.811 0.00 18,393.023 . 21,400.000 79.215 333.284 7,723.853 7,775.853 12,272.858 -13,825.476 5,987,088.885 358,090.160 0.00 18,483.595 21,500.000 79.215 333.284 7,742.565 7,794.565 12,360.605 -13,869.638 5,987,177.368 358,047.509 0.00 18,574.167 21,600.000 79.215 333.284 7,761.276 7,813.276 12,448.352 -13,913.801 5,987,265.851 358,004.858 0.00 18,664.740 21,700.000 79.215 333.284 7,779.988 7,831.988 12,536.099 -13,957.963 5,987,354.334 357,962.207 0.00 18,755.312 21,800.000 79.215 333.284 7,798.700 7,850.700 12,623.847 -14,002.125 5,987,442.816 357,919.556 0.00 18,845.885 21,833.667 79.215 333.284 7,805.000 7,857.000 12,653.389 -14,016.993 5,987,472.606 357,905.197 0.00 18,876.378 TD (BHL)-21833.600 ft MD, 7856.984 ft TVD; 4975ft FNL & 4984ftFEL, Sec21-T12N.-1 - DESCRIPTION REV DATE BY CK APP _¿SCRIPTION REV DATE BY CK .r'P o 5/29/01 G.D J.Z C.A. PER A01004ACS 4 5/15/03 G.D. J.Z. I C.A PER K03074ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC.2, T 11 N, R 4 E, U.M. SEC.LlNE O/S PLAN WELL y' X LAT.(N) LONG.(W) FNL FEL GND PAD 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.8 8.8 8.8 8.8 8.8 8.8 8.8 8.8 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.6 8.6 8.6 8.6 8.6 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 1558' 1556' 1555' 1554' 1552' 155" 1550' 1549' 1548' 1546' 1545' 1544' 1543' 1542' 1541' 1539' 1538' 1536' 1536' 1534' 1533' 1532' 153" 1530' 1528' 1527' 1526' 1525' 1523' 1522' 1521 ' 1520' 1519' 1517' 1516' 1515' 1514' 1513' 1512' 1510' 1509' 1508' 1506' 1505' 1504' 1503' 1502' 1501 ' 1499' 1498' 1497' 1496' 1494' 1493' 1617' 1627' 1636' 1646' 1656' 1666' 1676' 1686' 1696' 1706' 1716' 1726' 1736' 1746' 1755' 1765' 1775' 1785' 1795' 1805' 1815' 1825' 1835' 1844' 1855' 1865' 1875' 1885' 1894' 1905' 1915' 1924' 1934' 1944' 1954' 1964' 1974' 1984' 1994' 2004' 2013' 2024' 2034' 2043' 2053' 2063' 2073' 2083' 2093' 2103' 2113' 2123' 2133' 2143' 02' 28.443" 02' 28.406" 02' 28.359" 02' 28.337" 02' 28.291" 02' 28.259" 02' 28.226" 02' 28.193" 02' 28.151" 02' 28.110" 02' 28.083" 02' 28.044" 02' 28.008" 02' 27.976" 02' 27.939" 02' 27.897" 02' 27.870" 02' 27.817" 02' 27.801" 02' 27.756" 02' 27.725" 02' 27.691" 02' 27.648" 02' 27.620" 02' 27.575" 02' 27.548" 02' 27.513" 02' 27.474" 02' 27.438" 02' 27.407" 02' 27.363" 02' 27.331" 02' 27.297" 02' 27.256" 02' 27.216" 02' 27.187" 02' 27.148" 02' 27.116" 02' 27.087" 02' 27.042" 02' 27.005" 02' 26.971" 02' 26.934" 02' 26.898" 02' 26.868" 02' 26.836" 02' 26.793" 02' 26.762" 02' 26.724" 02' 26.684" 02' 26.652" 02' 26.618" 02' 26.580" 02' 26.544" 151' 151' 151' 151' 151' 151' 151' 151" 151' 151' 151' 151' 151' 151' 151' 151" 151" 151" 151' 151' 151' 151' 151' 151' 151' 151' 151' 151' 151' 151' 151' 151' 151' 151' 151' 151' 151" 151' 151" 151' 151' 151' 151' 151' 151' 151' 151" 151' 151' 151' 151" 151· 151' 151' 21.202" 21.103" 21.008" ?O. 910" 20.812" 20.716" ?0.617" ?0.519" 20.424" 20.328" 20.225" 20.130" 20.033" 19.935" 19.842" 19.739" 19.642" 19.545" 19.445" 19.348" 19.250" 19.152" 19.053" 18.958" 18.860" 18.763" 18.665" 18.565" 18.475" 18.370" 18.274" 18.179" 18.079" 17.986" 17.885" 17.787" 17.689" 17.595" 17.494" 17.396" 17.304" 17.200" 17.102" 17.006" 16.908" 16.811" 16.713" 16.618" 16.518" 16.421 II 16.322" 16.226" 16.128" 16.029" 70' 20' 70' 20' 70" 20' 70' ?O' 70' 20' 70' 20' 70' ?O' 70' ?O' 70' 20' 70' 20' 70' 20' 70' 20' 70' 20' 70' ?O' 70" 20' 70' 20' 70' 20' 70' 20' 70' 20' 70' 20' 70' 20' 70· 20' 70' 20' 70' 20' 70' 20' 70' 20' 70' 20' 70' 20' 70' 20' 70' 20' 70· 20' 70' 20' 70' 20' 70' 20' 70" 20' 70' 20' 70' 20' 70· 20' 70" 20' 70' 20' 70' 20' 70' 20' 70' 20' 70' 20' 70' 20' 70" 20' 70' 20' 70' 20' 70· 20' 70· 20' 70' 20' 70' 20' 70· 20' 70· 20' 371,685.60 371,686.73 371.688.17 371.688.72 371.690.14 371,691.07 371,692.02 371.692.98 371,694.26 371,695.50 371,696.24 371,697.39 371,698.48 371,699.38 371,700.50 371.701.77 371,702.51 371,704.15 371,704.52 371,705.92 371,706.81 371,707.80 371,709.10 371,709.87 371,711.26 371,712.00 371,713.04 371,714.18 371,715.28 371,716.13 371,717.49 371,718.42 371,719.40 371,720.66 371,721.83 371,722.68 371,723.84 371,724.77 371,725.60 371,726.94 371,728.07 371.729.06 371,730.13 371,731.19 371,732.05 371,733.00 371,734.28 371,735.18 371,736.31 371,737.50 371 ,7 38.44 371,739.42 371,740.55 371,741.60 5,974,741.17 5,974,731.13 5,974,721.46 5,974,711.45 5,974,701.48 5,974,691.64 5,974.681.62 5.974.671.61 5.974.661.90 5,974.652.12 5.974,641.66 5,974,631.95 5,974,622.10 5,974,612.15 5,974.602.64 5,974,592.18 5,974,582.28 5,974,572.39 5,974,562.21 5,974,552.30 5,974,542.33 5,974,532.34 5,974,522.31 5,974,512.60 5.974.502.63 5.974.492.75 5,974,482.74 5,974,472.57 5,974,463.34 5,974,452.65 5,974,442.90 5,974,433.20 5,974,423.05 5,974,413.52 5,974,403.28 5.974.393.27 5,974,383.33 5,974,373.69 5,974,363.45 5,974,353.42 5,974,344.11 5,974,333.52 5,974,323.53 5,974,313.77 5,974,303.80 5,974,293.84 5,974,283.88 5,974,274.18 5,974,264.07 5,974,254.19 5,974,244.05 5,974,234.27 5,974,224.26 5,974,214.18 CD2-1 CD2-2 CD2-3 CD2-4 CD2- 5 CD2-6 CD2-7 CD2-8 CD2- 9 CD2-10 CD2-11 CD2-12 CD2-13 CD2-14 CD2-15 CD2-16 CD2-17 CD2-18 CD2-19 CD2- 20 CD2- 21 CD2- 22 CD2- 23 CD2-24 CD2-25 CD2-26 CD2- 27 CD2-28 CD2- 29 CD2-30 CD2-31 CD2- 32 CD2-33 CD2- 34 CD2-35 CD2- 36 CD2- 37 CD2-38 CD2-39 CD2-40 CD2-41 CD2-42 CD2-43 CD2-44 CD2-45 CD2-46 CD2-47 CD2-48 CD2-49 CD2-50 CD2-51 CD2-52 CD2-53 CD2- 54 CD2- 55 CD2- 56 CD2-57 CD2- 58 CD2-59 C02-60 * * * COORDINA TES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 27. ELEVA TIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.) * INDICATES DATA PER LOUNSBURY AS-BUILT. ALPINE NOTES 1 . 2 3 CD UNIT: MODULE: CD20 ALPINE PROJECT CD- 2 WELL CONDUCTORS AS-BUILT LOCATIONS 21 I PART: 2 ps Alaska, Inc. I ORA WING NO: ~/ ConocoPhilli REV: 4 3 OF CE-CD20- INAL (~ ~.ff'J OR 05-27-0 CADO FILE NO. 01-02-05- "~/ . ... ... . ·-':-_'Ph·, , , i_II_; Co noco , , .,", ,,' I" IPS ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine CD2 Plan: CD2-21 Plan: CD2-21 Plan: CD2-21 (wp06) Anticollision Summary Report 08 December, 2004 ORIG\NAL Conoc6Phillips Company: Project: Reference Site: Site Error: Reference Well: Well Error: Reference Wellbore Reference Design: Reference ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine C02 O.OOOft Plan: CD2-21 O.OOOft Plan: CD2-21 Plan: CD2-21 (wp06) Plan: CD2-21 (wp06) SPERRY_SUN HES Anticollision Summary Report lOcal COOoOrdinateReference: TVD Reference: MD Reference: North Refel'ence: Survey Calculation Method: Outputerrors are at Database: Offset TVD Reference: Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: TVD + Stations Interval1.000ft Error Model: Depth Range: 7,200.000 to 7,250.000ft Scan Method: Re$ults Limited by: Maximum center-center distance of 2,282.298ft Error Surface: Warning levels Evaluated at: 0.00 Sigma Survey Tool progr;¡m From (ft) 36.100 1,125.000 12/8/2004 9:03:19AM Date 12fl12004 To (ft) Survey (WeUbore) Tool Name 1,125.000 Plan: CD2-21 (wp06) (Plan: CD2-21) 20,244.038 Plan: CD2-21 (wp06) (Plan: CD2-21) CB-GYRO-SS MWD+I FR-AK-CAZ-SC Well Plan: CD2-21 52' MSL @ 52.000ft (52' MSL) 52' MSL @ 52.000ft (52' MSL) True Minimum Curvature 1.00 sigma EDM 2003.11 Single User Db Offset Datum ISCWSA Horizontal Plane Elliptical Conic Descrip~iC)n Camera based gyro single shot MWD+IFR AK CAZ SCC CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 2 of 6 COMPASS 2003.11 Build 48 ORIGINAL "'--" ~/ ConocoPhillips SPERRY_SUN HES Anticollision Summary Report Company: Project: Reference Site: Site Error: Reference Well: Well Error: Reférence WeJlbore Reference Design: ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine C02 O.OOOft Plan: CD2-21 O.OOOft Plan: CD2-21 Plan: CD2-21 (wp06) Plan: CD2-21 MSL @ 52.000ft (52' MSL) MSL @ 52.000ft (52' MSL) Curvature 1.00 sigma EDM 2003.11 Single User Db Offset Datum Summary Site Name Offset Well- Wellbore . Design 12/8/2004 9:03: 19AM CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 3 of 6 COMPASS 2003.11 Build 48 ORIGINAL Conoc;pf,illips Company: Proj.~t: ReferençeSite: Site Error: Reference Well: Well Error: Reference Wellbore Reference Design: ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine CD2 O.ooott Plan: CD2-21 O.OOOtt Plan: CD2-21 Plan: CD2-21 (wp06) summary Site Nâl11e Off$etWell - Wellbore - Design Alpine CD2 CD2-05 - Plan: CD2-05 - CD2-05 (Rig Surveys) CD2-06 - CD2-06 - CD2-06 CD2-07 - CD2-07 - CD2-07 CD2-07 - CD2-07PB1 - CD2-07PB1 CD2-07 - CD2-07PB2 - CD2-07PB2 CD2-08 - CD2-08 - CD2-08 CD2-09 - Plan: CD2-09 - CD2-09 (Rig Surveys) CD2-10 - CD2-10 - CD2-10 CD2-10 - CD2-10PB1 - CD2-10PB1 CD2-12 - CD2-12 - CD2-12 CD2-13 - CD2-13 - CD2-13 CD2-13 - CD2-13PB1 - CD2-13PB1 CD2-13 - CD2-13PB2 - CD2-13PB2 CD2-14 - CD2-14 - CD2-14 CD2-15 - CD2-15 - CD2-15 CD2-15 - CD2-15 - CD2-15 CD2-15 - CD2-15PB1 - CD2-15PB1 CD2-15 - CD2-15PB2 - CD2-15PB2 CD2-16 - CD2-16 - CD2-16 CD2-16 - CD2-16 (Sag) - CD2-16 (Sag) CD2-18 - CD2-18 - CD2-18 CD2-18 - CD2-18PB1 - CD2-18PB1 CD2-19 - CD2-19 - CD2-19 CD2-20 - CD2-20 - C02-20 CD2-22 - CD2-22 - CD2-22 CD2-23 - CD2-23 - CD2-23 CD2-23 - CD2-23PB1 - CD2-23PB1 CD2-24 - CD2-24 - CD2-24 CD2-24 - CD2-24PB1 - CD2-24PB1 CD2-25 - CD2-25 - CD2-25 CD2-26 - CD2-26 - CD2-26 CD2-26 - CD2-26PB1 - CD2-26PB1 CD2-26 - CD2-26PB2 - CD2-26PB2 CD2-27 - CD2-27 - CD2-27 CD2-28 - CD2-28 - CD2-28 CD2-28 - CD2-28PB1 - CD2-28PB1 CD2-29 - CD2-29 - CD2-29 CD2-30 - CD2-30 - CD2-30 CD2-31 - CD2-31 - CD2-31 CD2-31 - CD2-31 PB1 - CD2-31 PB1 CD2-32 - CD2-32 - CD2-32 CD2-32 - CD2-32 PB1 - CD2-32 PB1 CD2-33 - CD2-33 - CD2-33 CD2-33 - CD2-33A - CD2-33A CD2-33 - CD2-33B - CD2-33B CD2-34 - CD2-34 - CD2-34 CD2-34 - CD2-34PB1 - CD2-34PB1 CD2-35 - CD2-35 - CD2-35 CD2-35 - CD2-35A - CD2-35A CD2-36 - CD 2-36 - CD 2-36 CD2-36 - CD2-36 PB1 - CD2-36 PB1 CD2-37 - CD2-37 - CD2-37 CD2-38 - CD2-38 - CD2-38 SPERRY_SUN HES Anticollision Summary Report Local Co-ordinate Reference: TVDReferençe: MD Reference: North Reference: Survey Calculation Method: Output errol'8 are at Database: Offset TVD Reference: Reference Measured Depth (ft) Offset Measured Depth Cft) Well Plan: CD2-21 52' MSL @ 52.000tt (52' MSL) 52' MSL @ 52.000tt (52' MSL) True Minimum Curvature 1.00 sigma EDM 2003.11 Single User Db Offset Datum Distance Between BetWeen Centl"és Ellipses (ft) (ft) 1,478.748 1,474.026 929.237 941.689 Separation Factor Warning 13,188.391 13,262.856 13,873.347 14,064.231 595.318 579.634 Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 2.691 ES, SF 2.769 CC Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 37.958 CC, ES, SF Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 12/8/2004 9:03.·19AM CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 4 of 6 COMPASS 2003.11 Build 48 13,118.634 14,293.459 ORIGINAL ---- - ,- ConoccrPhillips SPERRY_SUN HES Anticollision Summary Report Company: Projøct: Reference Site: SltêError: Ref~reocø Well: Wël.l.Error: ReførehceWellbore Reference Oeslgo: ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine CD2 O.OOOft Plan: CD2-21 O.OOOft Plan: CD2-21 Plan: CD2-21 (wp06) Summary Slte.Nanie Offsetwell~Wellbore -Design Alpine CD2 CD2-38 - CD2-38 (Sag) - CD2-38 (Sag) CD2-39 - CD2-39 - CD2-39 CD2-39 - CD2-39PB1 - CD2-39PB1 CD~40-CD~40-CD~40 CD~40-CD2-40PB1-CD240PB1 CD2-41 - CD2-41 - CD2-41 CD2-42 - CD2-42 - CD2-42 CD2-42 - CD2-42PB1 - CD2-42PB1 CD2-43 - CD243 - CD2-43 CD2-43 - CD2-43PB1 - CD243PB1 CD2-44 - CD2-44 - CD2-44 CD~45-CD245-CD~45 CD2-46 - CD2-46 - CD2-46 Plan: CD2-11 - Plan: CD2-11 - Plan: CD2-11 (wp06) Plan: CD2-17 - CD2-17 - CD2-17 Plan: CD2-17 - Plan: CD2-17 X - Plan: CD2-17 X (wp01) Plan: CD2-21 - Plan CD2-21 PB1 - Plan CD2-21 PB1 (wp03 Plan: CD2-21 - Plan CD2-21 PB1 - Plan CD2-21 PB1 (wp03 Plan: CD2-21 - Plan CD2-21 PB1 - Plan CD2-21 B (wp02) Plan: CD2-21 - Plan CD2-21 PB1 - Plan CD2-21B (wp02) 18,699.925 18,799.925 18,699.925 18,799.925 18,485.293 18,485.135 18,485.282 18,485.125 1,133.114 1,131.556 1,133.119 1,131.560 716.253 727.529 716.295 727.569 Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 2.718 ES, SF 2.801 CC 2.718 ES, SF 2.801 CC 12/8/2004 9:03:19AM CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation OR(GrNAL COMPASS 2003.11 Build 48 ",,=/ ConocoPhillips Company: Pròject: Reference Site: Site Error: Reference Well: Well Error: Reference Wellbore Reference Design: ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine C02 O.OOOft Plan: CD2-21 O.OOOft Plan: CD2-21 Plan: CD2-21 (wp06) Reference Depths are relative to 52' MSL @ 52.000ft (52' MSL) Offset Depths are relative to Offset Datum Central Meridian is -150.000000000 2200 '2 ~ o 1.0 !£. c: o ~ ro a.. Q) en 11 ~ 'E Q) u .8 ~ 'E Q) o 550- I I I I _____1___._ I I 1 1 -~------- SPERRY_SUN HES Anticollision Summary Report local Co-ordlnate Reference: TVD Refe.rence: MDReference: North Reference: SurveyCalcIJ1ationl\/lethOd: OlJtPlJt errors are at Database: Offset TVDReference: Well Plan: CD2-21 52' MSL @ 52.000ft (52' MSL) 52' MSL @ 52.000ft (52' MSL) True Minimum Curvature 1.00 sigma EDM 2003.11 Single User Db Offset Datum Coordinates are relative to: Plan: CD2-21 Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Grid Convergence at Surface is: -0.980 Ladder Plot .~ / , I .... ........1...... I I I I I I !:J munnomm ...____ ._~_..... J - - - - -" - - - - ----~---------~---------~------- t t I I ·43, CD2-46 V2 ·2::> C02-22 V1 -4;' CD2-421¢o -4 ;~B1, CD2-4:fPB1 VO 3500 -I- ,ê8~QH,PB1 V2 14000 Flan: CD2-04, Plan: CD2-04 (wp02) V4 -å- C02-26, CO~E2ª~~~4h (3500 ftlin) ·44. CD2-44 V15 C02-26. C02-26P82. CD2-26P82 V3 ·2 3PB1, C02-23PB1 V12 -e- CD2-06, C02-06, CD2-06 V6 ·23, CD2-23 V2 CD2-05, Plan: CD2-05, CD2-05 (Rig Surveys) VO ·33, CD2-33 V2 CD2-09, Plan: CD2-09, CD2-09 (Rig Surveys) VO -33A,CD2-33AV1 '"* CD2-16,CD2-16,CD2-16 V7 ·338, CD2-338 V1 CD2-16, CD2-16 (Sag), CD2-16 (Sag) VO ·32, CD2-32 VO -I- C02-41, CD2-41, CD2-41 V9 -32 PB1, CD2-32 P81 VO -e- CD2-12, CD2-12, CD2-12 V7 -23, CD2-28 V3 ........ CD2-18, CD2-18PB1, CD2-18PB1 V5 ·2 3PB1, CD2-28PB1 V13 CD2-18, CD2-18, CD2-18 V19 ·2 J, CD2-20 V4 CD2-45, CD2-45, CD2-45 V5 t'tð n. CD2-17 X, rid,), CD2-17 x (vvpO 1)!.... rtMI. CD2-11 , Pld ,). CD2-11 , F'lð ,). CD2-11 (vv¡.;OO) V::;2~;¡¡;(.t," PB1 , PI~n CD2-21 8 (wpO~}}¡f2 CD2-30, CD~-30, C02-3C V31 "Y2 : '"* CD2-24, CD2-24PB1, CD2-24P81 ....... CD2-24, CD2-24, CD2-24 VO -e-~ ~"l:AAQ8, CD2-0B, 8ð2~ V14 ..... CD2-43, CD2-43, CD2-43 V15 -*"" CD2-43. CD2-43P81. CD2-43P61 .... CD2-13, CD2-13P82, CD2-13PB2 ..g,.. CD2-13, CD2-13, CD2-13 V1 CD2-13, CD2-13P81, CD2-13P81 -ð- CD2-37, CD2-37, CD2-37 V17 Plan: CD2-03, Plan: CD2-03, Pia n: oø8- CD2-40, CD2-40, CD2-40 V9 ~. CD2-40, CD2-40PB1, CD2-40PB1 CD2-35, CD2-35A, CD2-35A V1 CD2-35, CD2-35, CD2-35 V1 CD2-29, CD2-29, CD2-29 V1 CD2<.W, CD2-80 F'01, CD2-JG r81 12/8/2004 9:03:19AM CC .. Min centre to center distance or covergent point, SF.. min separation factor, ES - min ellipse separation Page 6 of 6 COMPASS 2003.11 Build 48 ORiGINAL ",",,/' ConocoPhillips o ::0 - G) - z ):::- I ConocoPhillips Alaska Inc. ANTI-COLLlSION SETTINGS Traveling Cylinder Engineering Alpine Interpolation Method: TVD + Stations Interval: 1ft Stations Calculation Method: Minimum Curvature Error System: ISCWSA Scan Method: Horizontal Plane Error Surface: Elliptical Conic Warning Method: Rules Based Depth Range From: 7200 To 7250 Reference: Plan: CD2-21 (wp06) Maximum Range: 2282.3 ft o 270 ( 2250 1800~ . . ~CD2-15ICD2-15 1350 90 _2W- - IPlan: CD2-21/Plan CD2-21 PB1 (wp03) I 180 Highside Toolface Angle [0] vs Centre to Centre Separation [900 Win] spe......y-sun QÄI·L;..t,..:ING5'eÄvfce$ .\ 1I.'U",t..I.M,KI'O' n~""I",\.~"i 330 300 c ~ G) - 270.' :t> r o 1320 880 -------- // // / / / I I ! I I \ ~/ 17200 30 - ~ - - - - -I C02-24/CD2-24I \ 150 I I I / I Plan: CD2-21/Plan C~2-21 PB1 (wp03) I 180 Highside Toolface Angle [0] vs Centre to Centre Separation [440 ft/in] COllocoPhiUips Alaska IlIc. Engiilæring Alpine Calculation Method: Minimum Curvature Error System: ISCWSA Scan Method: Horizontal Plane Error Surface: Elliptical Conic Warning Method: Rules Based ANTI-COLLISION SETTINGS Interpolation Method: TVD + Stations Interval: IStations Depth Range From: 7200 To 7250 Reference: Plan: Plan: CD2-21 (wp06) Maximum Range:2282.29821079358 ConocJ'Phillips LPINE 1/4 Mile Radius of CD2-21 in Alpine _1-1_1 ·r-ay-sun DAILLING SEAVIc:es ,," IU.LLIIU ¡U'O~ c(""u...\..;....,- WELL DETAILS: Plan: CD2-21 +NI-S 0.000 +E1-W Northing 0.000 5974582.280 Ground Level: 0.000 Easting Latittude 371702.510 70"20'19.642N Slot Longitude 151 "2"27.87W Engineering Alpine /" ~:.- ConocoPhillips ConocoPhillips Alaska Inc. , It\LlJtUltTO:"\ CO'U".Y'" Calculation MethodMinimum Curvature Error System: ISCWSA Scan Method: Horizontal Plane Error Surface: Elliptical Conic Warning Method: Rules Based 5i-Jt:I ·......y-5un DRILLING SERVices ~ --- ~ -.J~ --- CD2-21 ~ .......... CD2-24, CD2-24, CD2-24 va -' CRU CD2..21i'Pilot Hole 2042450 t .. 12/9/2004 .^-^".--^^^ 11'1I CRU CD2..21 1..0il 2042450· / . ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 . Conoc~illips December 8, 2004 RECEIVED DEC 0 9 2004 Alaska Oil and Gas Conservation Commission 333 West yth Avenue, Suite 100 Anchorage, Alaska 99501 Alaska Oil & Gas Cons. Commission Anchorage Re: Application for Permit to Drill CD2-21 and CD2·21 PB1 Dear Sir or Madam: ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from the Alpine C02 drilling pad. The intended spud date for this well is December 24, 2005. It is intended that Doyon Rig 19 drill the well. / The pilot hole well, CD2-21 PB1 will be drilled through the Alpine C sand and Nechelik sand at +/-78° inclination for logging and evaluation purposes. The well will be plugged o -.J~\Ç)S:. rJ.. back 500+ MD feet above the top of the Alpine formation. The well CD2-21 will then be Y drilled off the 2nd cement plug at approximately 8500' MD and landed in the Alpine sand horizontally. A string of 7" casing will then be run and cemented in place. The horizontal section will be drilled with oil based mud using mineral oil as the base fluid. CD2-21 will be completed as an AlC sand producer. At the end of the work program the well will be shut in awaiting surface connection. Note that it is planned to drill the surface hole without a diverter. There have been 52 w_ells drilled on C02 pad wi~h no significant indication of gas or shallow gas hydrates. Please find attached the information required by 20 ACe 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 1 0-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a). 2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1). 3. A proposed drilling program 4. A drilling fluids program summary. 5. Proposed pilot hole plug back diagram. 6. Proposed completion diagram. 7. Pressure information as required by 20 ACC 25.035 (d)(2). 8. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b). Information pertinent to this application that is presently on file at the AOGCC is: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold layout as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser setup which replaces diverter ORIGINAL . . If you have any questions or require further information, please contact Vern Johnson or Zane Kuenzler at 265-6081 or 265-1308, respectively. Chip Alvord can also be reached by calling 265-6120. Sincerely, ~~~4 Drilling Engineer Attachments cc: CD2-21 Well File 1 Sharon Allsup Drake Chip Alvord Vern Johnson/Zane Kuenzler Tim Schneider Steve Moothart/Jeff Yeaton Bill Esco Lanston Chin ATO 1530 ATO 1700 A TO 1702/1704 ATO 1768 ATO 1756/1752 Anadarko - Houston Kuukpik Corporation . · · · "-'1( ...'-_.._~.._~,... -,...... SHARON K. ALLSUP-DRAKE CONOCOPHILLlPS ATO 1630 700 G STREET ANCHORAGE AK 99501 1080 DATE~4~4/311 ,..¡ l I ~::.~' 7rt~ CF AlIIS.tfr 11to6~ I ~ roo.(}ð__ ~LoLJ ~~ ~~ too DOLLARS tð ~~~"". ...... CHAS E Ch... M.nh.tt.n B.nk USA, N.A. Valid Up To 5000 Dollars ~ U *_".o_._~....., L , .<NO __Æ:_~",- ¿ ~. P-L : I: 0 3 ~ ~ 0 0 ~ L, L, I: 2 ~ B L, 7 ~ gO 7 g 2 7 b III ~ 0 B 0 ry ~#"I"<\~"~~ - .._.,.~. ~~:--""'-WUj,1!t~~""''"'''f~,_.:':::' UNNeRSAL .. .. TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME (lIe ¿( (!ì) z- 2-/ PTD# zoc/ - z- r-I ~ Development Service CHECK WßA T APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (1f API Dumber last two. (2) digits are between 60-69) Exploration Stratigraphic ~'CLUE n. The permit is for a new wellbore 'segment of existing weD'. . Permit No, .' API No. Production.sbould continue to be reponed as a function' of the original API number. stated above. . HOLE In accordance with 20 AAC 25.005(1), all records, data and logs acquired for the pilot bole must be clearly differentiated In both name (name on permit plus PH) J / ð.Þ.Z~ZI PI! and API Dumber (50/D3 zC>s;Þy-- 70 ~ from records, data and logs acquired for we)) (name on permit). PILOT (PH) v' SPACING EXCEPTION DRY DITCH SAMPLE Tbe permit is approved subject ·to fun compliance with 20 AAC 2S..0S5~ Approval to perlorate and produce is contingeDt upon issuance of ~ conservation order approviDg a spa cing e:J ceptioD. (Company Name) assumes tbe liability of aDY protest to tbe spacing .e:Jception tbat may occur. AU dry ditcb sample sets submitted to tbe Commission must be in no greater 1ban 30' sample intervals from below tbe permafrost or from wbere samples are first caugbt and ] 0' sample iIiter:vals tbrougb target zones. D D .~ Well bore seg Annular Disposal Program DEV On/Off Shore Well Name: COLVillE RIV UNIT CD2-21 DEV / PEND GeoArea 890 On in .o..DL 387212.; TDoo ASRC-Fee <1I:~reage.Piloth9IeTDon Uoit, ç¡l1d..witNnJ:~Q 44..3Aþoun~ç¡rje$... goyeroedbyCQ 443A... AlpineOi . . Yes Y.ßs Y~s Yes Yes Y~s Y..es Yes Y~s Y~$ Yes NA NA NA ..NA NA ..NA 50360 Surface loc iJlADJ...38Q075; i!1t.ß(Vç¡1 .o..DI., Q37821J, All ç¡ffe..cted acre~9.e..comlJ1itted toJlJe CQh(ÎlleRiv.er Colville..Riv.er Uoit, Pool Unit top procl nitial Class/Type Field & Pool COLVillE RIVER, ALPINE Oil -120100 - .-~ CONOCOPHllLlPS ALASKA INC P..ermit fee ~ttaçhe..d.. le~s.ßnumberappropri!it.ß .. "0'''0'' n..alJ1.ß ..and olJ.mb..er I Company ina d..efil1e~ .pool ..UJI[q,.." """. Wel WeJ We I bound..ary.. Joc!it.ßd proper ..distance.. from driJli!1g unit Joc!ited properd[sta!1ce from otlJer welJs ..SJJtfiçient ~ Jtd.ßviatec ~creage..aYailable indrilJio9 unjt js weJlbore plç¡tJncJu..ded Qperator onl)' affected party ..Oper..ator lJé!s..appropriate.. bond in Jorce P.ßrmit P.ß(mit. Can permit be approved before WeJI Jocated within areé! andstrç¡t!i authorized by..lojection Order # (put 10# ..AJI welJs..within 1l4JlJile..area..of review jd.ßot[fied cao Þe [sslJ.ed witlJout co..nservation order c.ao Þe isslJ.ed without actministratille..apprpval 15-day wait (for (111)') (for service well only) in.. cOlJ1m.ßots (For ~ervjc.ewel Pre-produq¡ct injector; ~urat.io..nof pre-pro~uctioo less than 3 months.. ACMP findjng 9f Consi$t.ency has Þeen issued for.. this prolect 2 3 4 '5 6 7 8 9 o 11 12 13 14 15 16 7 PTD#: 2042450 Administration Date 12/9/2004 Appr SFD - No aquifers,..perAIO..1ßA conclusion 3. Inte(l1"\ediate c.em.ßotwill GOyer ..ao)' oon:p..ay ~ones,a!ll1uJar di$posç¡ uJtimatelypJanneO.. Open.h..olecompletion planl1ed, . .' Waste to approved annulJJs ordjspo~al wel No reseJ\lepjtplamJed, Rig js. equippedwit!l $t.ßelpits. I?ro:>.cimit)' an..alysis perfo(l1"\ed, Jrayeling ç)'lioder Path Cé!lcu!ate..d, ßyros pos..siÞle, Diyerter waiver Maximum expectect foonation pre~sur..e ..8,7.. EMW jn Alpioe. CD2..pad. !las beeo givenJor F'lanJled weight~ 9.8 (8,5")and8.8in Alpine. MAS!=' Cé!fcu]ated..at 2549 psi, 35QOp$iappr..oprjate, PPCo Usu!ilJytests to 50QO pst Y.ßs NA Yes No No.. Y.ßs Y.ßs NA Yes NA Y.ßS Y.ßs Y.ßs Y.ßs Y.ßs No.. NA Cooductor Surfac.e ..~ known USDWs ..CMT. v.ol JeCllJ.ate.. to çirculateon .cOl1d..uctor.. string provided ~~~ing. protect~ al 8< SUJfÇ$g to_suú c~g.. to tie-in koown .pro..ductiYe horizons ..CMT.wil! coyer a] Casing designs ad..equa_te fpr C,J", B& permé!frost ..tankage_oJ re..serve pit ..Mequate JfaJe-drilt !laS..a.. 10,.403 for abé!ndonme.nt ..A~equate ..v,.ellbore ~epar!itjo..n ..pro.po~.d t be.ßO apprQved 18 119 20 i21 122 23 24 25 26 27 28 Engineering Jongstring CMT vot adequ..ate.. meet reguJa_tions_ Iist..adequ!it.ß Jfdjverter req"uired, does schematic & eq"uip they meet Drilling fluid. progré!m BOPEs,dp Appr Date TEM.. 13(10/2004 29 /ðt, h/ ( 30 31 incommeots) reguJatiol1 test to .(put ..C..hoke l1Jé!nifold complies w/API. RF'-53 lMay 84) _Work will occ_ur ,u'."n ,. , J~ pre~ence_ of "1 Meçhanicalcol : psig ratiog approprié!te; BOPE.press ~_."..",IJ, operation ..shutdown . 12S gas.. probaÞle 32 33 34 -- wells wi.thil1 .o..OR verified (For_s_ervjce well only) Y.ßs Y.ßs NA NA NA iSSlJ.ed wlo hYdr9gen_ s_ulfide meaS..ures P.ßrmit c.an Þe _D_ata_preseoted on.. pote_ntial oveJpreS_SUre _Zone$ 35 36 37 38 39 Geology 8.8 ppg mud. Expected r_eservojr preSSUJe i$ 8,7 ppg EMW; willbedril!ed with 8. .S.ßÎ..smicanalysis of shaJlow 9as.zpoes .S.ßabed ..col1djtioo survey (if off-sh.ore) Contact namelphoneJorv,.eekly progressreports [exploratory _001Y1 Date 12/9/2004 Appr SFD Public Commissioner '773ft f£ Date Engineering Commissioner :;;3/1. Geologic Commissioner: .piS' . . Well History File APPENDIX Information of detailed nature that is not particularly gennane to the Well Pennitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, infonnation of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. . . ~6c/~ Z cß; Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Fri Mar 11 08:02:10 2005 #{] I (P 0 Reel Header Service name............ .LISTPE Date.................... .05/03/11 Origin.......... .........STS Reel Name... .. . .. ....... . UNKNOWN Continuation Number......01 Previous Reel Name...... . UNKNOWN Comments.... ..... ........STS LIS Writing Library. Scientific Technical Services Tape Header Service name.. . . . ....... .LISTPE Date.................... .05/03/11 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name.. . . . . . . . . .. .. . .UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Colville River Unit (Alpine) MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA CD2-21 PB1 501032050470 ConocoPhillips Alaska, Inc. Sperry Drilling Services 11-MAR-05 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 2 MW0003458623 R. KRELL D. LUTRICK MWD RUN 3 MW0003458623 R. KRELL D. LUTRICK MWDRUN 4 MW0003458623 M. HANIK D. LUTRICK # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 2 11N 4E 1775 1538 53.00 15.90 # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.625 3084.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELLBORE WAS A PLANNED PILOT HOLE, WITH AN . . EXPLORATION TAIL. 4. THE MAIN CD2-21 WELLBORE EXITS FROM THIS WELLBORE AT 8515'MD/5042'TVD. 5. MWD RUN 1 WAS DIRECTIONAL ONLY - NO DATA ARE PRESENTED. 6. MWD RUNS 2 - 4 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4); COMPENSATED THERMAL NEUTRON POROSITY (CTN); AZIMUTHAL LITHO- DENSITY (ALD); PRESSURE WHILE DRILLING (PWD); ACOUSTIC CALIPER (ACAL); AND GEOPILOT ROTARY-STEERABLE BHA. 7. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE LOGGING REQUIREMENTS AT CONOCO-PHILLIPS/VENDOR MEETING HELD ON 26 SEPTEMBER 2001. 8. MWD RUNS 1-4 REPRESENT WELL CD2-21 PB1 WITH API#:50-103-20504-70. WELL DATA FOR THIS PRESENTATION WERE CUT OFF AT 18600'MD/7304'TVD, THE START OF THE EXPLORATION SECTION. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, ACAL-DERIVED). CTFA SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN) . SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN) . SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN) . PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: ACAL-DERIVED (8.5" BIT) MUD WEIGHT: 9.6 - 9.9 PPG MUD SALINITY: 250 - 25,000 PPM CHLORIDES FORMATION WATER SALINITY: 23,000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ File Header Service name........ .....STSLIB.001 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation... ....05/03/11 Maximum Physical Record..65535 File Type. . . . . . . . . . . . . . . .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE NPHI FCNT NCNT DRHO RHOB PEF RPX RPS RPM RPD FET GR ROP CALA $ . . and clipped curves; all bit runs merged. .5000 START DEPTH 3007.5 3007.5 3007.5 3020.5 3020.5 3020.5 3053.5 3053.5 3053.5 3053.5 3053.5 3061. 0 3095.5 3848.5 STOP DEPTH 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ # REMARKS: BIT RUN NO 2 3 4 MERGED MAIN PASS. $ MERGE TOP 3007.5 7027.0 15977.0 MERGE BASE 7027.0 15977.0 18600.0 # Data Format Specification Record Data Record Type........ ..........0 Data Specification Block Type.....O Logging Direction............ .....Down Optical log depth units...... .....Feet Data Reference Point............. . Undefined Frame Spacing. ... .................60 .1IN Max frames per record.............Undefined Absent value..................... .-999 Depth Uni t s. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type. ..0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 NPHI MWD PU-S 4 1 68 32 9 FCNT MWD CNTS 4 1 68 36 10 NCNT MWD CNTS 4 1 68 40 11 RHOB MWD G/CM 4 1 68 44 12 DRHO MWD G/CM 4 1 68 48 13 PEF MWD BARN 4 1 68 52 14 CALA MWD INCH 4 1 68 56 15 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3007.5 18600 10803.8 31186 3007.5 18600 ROP MWD FT/H 0.22 308.54 154.05 31010 3095.5 18600 GR MWD API 42.08 412.32 115.829 31079 3061 18600 RPX MWD OHMM 0.19 24.13 6.3777 31094 3053.5 18600 RPS MWD OHMM 0.15 105.17 6.64925 31094 3053.5 18600 RPM MWD OHMM 0.12 1809.23 7.67014 31094 3053.5 18600 . . RPD MWD OHMM 0.34 2000 9.6642 31094 3053.5 FET MWD HOUR 0.16 80.11 1. 0686 31094 3053.5 NPHI MWD PU-S 11.42 59.8 29.1918 31186 3007.5 FCNT MWD CNTS 536.86 3007.47 1204.43 31186 3007.5 NCNT MWD CNTS 102385 191569 146406 31186 3007.5 RHOB MWD G/CM 0.195 3.092 2.45203 31160 3020.5 DRHO MWD G/CM -4.211 0.231 0.0350506 31160 3020.5 PEF MWD BARN 1. 89 13.26 3.02219 31160 3020.5 CALA MWD INCH 8.27 13.09 9.0677 28949 3848.5 18600 18600 18600 18600 18600 18600 18600 18600 18600 First Reading For Entire File.. ........3007.5 Last Reading For Entire File.......... .18600 File Trailer Service name.. .......... .STSLIB.001 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation.. .....05/03/11 Maximum Physical Record..65535 File Type........... .. . . .LO Next File Name... ........STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name. . . Version Number.. .........1.0.0 Date of Generation...... .05/03/11 Maximum Physical Record..65535 File Type............ . . . .LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE NPHI FCNT NCNT PEF RHOB DRHO RPX RPS RPM RPD FET GR ROP CALA $ 2 header data for each bit run in separate files. 2 .5000 START DEPTH 3007.5 3007.5 3007.5 3020.5 3020.5 3020.5 3053.5 3053.5 3053.5 3053.5 3053.5 3061. 0 3095.5 3848.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 6937.5 6937.5 6937.5 6951.5 6951.5 6951.5 6984.5 6984.5 6984.5 6984.5 6984.5 6992.5 7027.0 6941. 0 03-DEC-04 Insite 66.37 Memory 7027.0 3095.0 7027.0 57.8 63.0 . # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 CTN ASLD ACAL $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 COMP THERMAL NEUTRON Azimuthal Litho-Den Acoustic Caliper # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.............. ....0 Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.... .................60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . TOOL NUMBER 124725 134758 181190 727423 727423 8.500 3084.0 FloPro/LSND 9.70 43.0 8.0 13000 10.8 1.500 1.030 1. 300 1.900 72.0 107.6 72.0 72.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 NPHI MWD020 PU-S 4 1 68 32 9 FCNT MWD020 CNTS 4 1 68 36 10 NCNT MWD020 CNTS 4 1 68 40 11 RHOB MWD020 G/CM 4 1 68 44 12 DRHO MWD020 G/CM 4 1 68 48 13 PEF MWD020 BARN 4 1 68 52 14 CALA MWD020 INCH 4 1 68 56 15 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3007.5 7027 5017.25 8040 3007.5 7027 ROP MWD020 FT/H 0.22 302.31 159.328 7864 3095.5 7027 GR MWD020 API 42.08 191.66 122.991 7864 3061 6992.5 RPX MWD020 OHMM 0.19 19.68 4.67696 7863 3053.5 6984.5 RPS MWD020 OHMM 0.15 105.17 4.86841 7863 3053.5 6984.5 . . RPM MWD020 OHMM 0.12 1809.23 6.32137 7863 3053.5 6984.5 RPD MWD020 OHMM 0.34 2000 14.0765 7863 3053.5 6984.5 FET MWD020 HOUR 0.16 79.76 1.43896 7863 3053.5 6984.5 NPHI MWD020 PU-S 19.63 59.8 35.8357 7861 3007.5 6937.5 FCNT MWD020 CNTS 536.86 1941.06 934.123 7861 3007.5 6937.5 NCNT MWD020 CNTS 102385 173570 133853 7861 3007.5 6937.5 RHOB MWD020 G/CM 0.195 2.678 2.3006 7863 3020.5 6951. 5 DRHO MWD020 G/CM -4.211 0.231 0.023299 7863 3020.5 6951.5 PEF MWD020 BARN 2.01 13 .26 2.92634 7863 3020.5 6951. 5 CALA MWD020 INCH 8.45 12.63 9.05666 6012 3848.5 6941 First Reading For Entire File......... .3007.5 Last Reading For Entire File... ........7027 File Trailer Service name.. . . . ....... .STSLIB.002 service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .05/03/11 Maximum Physical Record..65535 File Type... . ...... . . . . . .LO Next File Name..... ..... .STSLIB.003 Physical EOF File Header Service name..... ........STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation.......05/03/11 Maximum Physical Record..65535 File Type. . . ....... . .. . . .LO Previous File Name.......STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE TNPS CTFA CTNA ACAL SBD2 SC02 SNP2 SEXP SESP SEMP SEDP SFXE SGRC SROP $ 3 header data for each bit run in separate files. 3 .5000 START DEPTH 6938.0 6938.0 6938.0 6941. 5 6952.0 6952.0 6952.0 6985.0 6985.0 6985.0 6985.0 6985.0 6993.0 7027.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: STOP DEPTH 15884.5 15884.5 15884.5 15888.0 15898.5 15898.5 15898.5 15931.5 15931. 5 15931. 5 15931.5 15931. 5 15939.5 15977.0 08-JAN-05 Insite 66.37 Memory 15977.0 7027.0 15977 . 0 59.2 . , . MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 CTN ASLD ACAL $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 COMP THERMAL NEUTRON Azimuthal Litho-Den Acoustic Caliper # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units. ......... . Feet Data Reference Point......... .....Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . 78.8 TOOL NUMBER 124725 134758 181190 727423 727423 8.500 3084.0 LSND 9.80 36.0 9.5 350 6.8 5.000 2.430 4.700 5.200 68.0 147.2 68.0 73.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 NPHI MWD030 PU-S 4 1 68 32 9 FCNT MWD030 CNTS 4 1 68 36 10 NCNT MWD030 CNTS 4 1 68 40 11 DRHO MWD030 G/CM 4 1 68 44 12 RHOB MWD030 G/CM 4 1 68 48 13 PEF MWD030 BARN 4 1 68 52 14 CALA MWD030 INCH 4 1 68 56 15 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 6938 15977 11457.5 18079 6938 15977 ROP MWD030 FT/H 9.25 308.54 161.456 17900 7027.5 15977 GR MWD030 API 57.8 154.82 105.629 17894 6993 15939.5 RPX MWD030 OHMM 5.14 17.07 7.08344 17894 6985 15931.5 . . RPS MWD030 OHMM 5.07 17.32 7.24777 17894 6985 15931. 5 RPM MWD030 OHMM 5.21 18.96 7.51747 17894 6985 15931.5 RPD MWD030 OHMM 5.3 15.63 7.61102 17894 6985 15931.5 FET MWD030 HOUR 0.21 20.25 0.600852 17894 6985 15931. 5 NPHI MWD030 PU-S 11.42 36.59 25.5781 17894 6938 15884.5 FCNT MWD030 CNTS 790.08 3007.47 1295.42 17894 6938 15884.5 NCNT MWD030 CNTS 120957 191569 150882 17894 6938 15884.5 DRHO MWD030 G/CM -0.016 0.194 0.0397684 17894 6952 15898.5 RHOB MWD030 G/CM 2.306 2.698 2.50207 17894 6952 15898.5 PEF MWD030 BARN 1. 98 5.32 3.02671 17894 6952 15898.5 CALA MWD030 INCH 8.6 11.22 9.13707 17773 6941. 5 15888 First Reading For Entire File.. ........6938 Last Reading For Entire File........ ...15977 File Trailer Service name............ .STSLIB.003 Service Sub Level Name. . . Version Number...........1.0.0 Date of Generation.......05/03/11 Maximum Physical Record..65535 File Type............... .LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name. . . Version Number...........1.0.0 Date of Generation... ... .05/03/11 Maximum Physical Record..65535 File Type............... .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE CTFA CTNA TNPS ACAL SBD2 SC02 SNP2 SEXP SESP SEMP SEDP SFXE SGRC SROP $ 4 header data for each bit run in separate files. 4 .5000 START DEPTH 15885.0 15885.0 15885.0 15888.5 15899.0 15899.0 15899.0 15932.0 15932.0 15932.0 15932.0 15932.0 15940.0 15977 . 5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG STOP DEPTH 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 18600.0 14-JAN-05 Insite 66.37 Memory 18600.0 15977.0 18600.0 . MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 CTN ASLD ACAL $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 COMP THERMAL NEUTRON Azimuthal Litho-Den Acoustic Caliper # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type. . ................0 Data Specification Block Type.....O Logging Direction............. ....Down Optical log depth units. . . . . . . ... . Feet Data Reference Point....... .... ...Undefined Frame Spacing........... ......... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . 55.8 78.6 TOOL NUMBER 124725 134758 181190 727423 727423 8.500 3084.0 LSND 9.80 38.0 9.0 300 3.0 1.700 .780 1.400 2.200 72.0 165.0 72.0 74.0 Name Service Order units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HOUR 4 1 68 28 8 NPHI MWD040 PU-S 4 1 68 32 9 FCNT MWD040 CNTS 4 1 68 36 10 NCNT MWD040 CNTS 4 1 68 40 11 RHOB MWD040 G/CM 4 1 68 44 12 DRHO MWD040 G/CM 4 1 68 48 13 PEF MWD040 BARN 4 1 68 52 14 CALA MWD040 INCH 4 1 68 56 15 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 15885 18600 17242.5 5431 15885 18600 ROP MWD040 FT/H 5.6 233.8 120.87 5246 15977 . 5 18600 GR MWD040 API 49.81 412.32 139.543 5321 15940 18600 . . RPX MWD040 OHMM 2.72 24.13 6.51721 5337 15932 18600 RPS MWD040 OHMM 2.98 29.26 7.2662 5337 15932 18600 RPM MWD040 OHMM 3.06 748.91 10.1691 5337 15932 18600 RPD MWD040 OHMM 3.26 253.42 10.0475 5337 15932 18600 FET MWD040 HOUR 0.27 80.11 2.09124 5337 15932 18600 NPHI MWD040 PU-S 13.98 48.2 31. 4817 5431 15885 18600 FCNT MWD040 CNTS 805.77 2601. 03 1295.9 5431 15885 18600 NCNT MWD040 CNTS 121618 188498 149825 5431 15885 18600 RHOB MWD040 G/CM 2.229 3.092 2.50669 5403 15899 18600 DRHO MWD040 G/CM -0.081 0.18 0.0365282 5403 15899 18600 PEF MWD040 BARN 1. 89 9.64 3.14669 5403 15899 18600 CALA MWD040 INCH 8.27 13.09 8.84182 5164 15888.5 18600 First Reading For Entire File. .........15885 Last Reading For Entire File.......... .18600 File Trailer Service name.. .......... .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation.......05/03/11 Maximum Physical Record..65535 File Type........... . .. . .LO Next File Name... ........STSLIB.005 Physical EOF Tape Trailer Service name............ .LISTPE Date.................... .05/03/11 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number......01 Next Tape Name..... . .. . . .UNKNOWN Comments.................STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name...... ...... .LISTPE Date.................... .05/03/11 Origin............ .... ...STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments.......... .......STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End of LIS File . . g¿ot- 2+{ $Revision: 3 $ LisLib $Revision: 4 $ Fri Feb 25 13:50:21 2005 #/} \) ~ ~ Sperry-Sun Drilling Services LIS Scan Utility Reel Header Service name. ............LISTPE Date.................... .05/02/25 Origin..... ............. .STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .05/02/25 Origin.................. .STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Colville River Unit (Alpine) MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA CD2-21 501032050400 ConocoPhillips Alaska, Inc. Sperry-Sun Drilling Services 25-FEB-05 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 2 MW0003458623 R. KRELL D. LUTRICK MWDRUN 3 MW0003458623 R. KRELL D. LUTRICK MWDRUN 5 MW0003458623 M. HANIK D. BURLEY JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 7 MW0003458623 M. HANIK D. BURLEY MWDRUN 8 MW0003458623 R. KRELL D. LUTRICK # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 2 llN 4E 1775 1538 MSL 0) 53.00 15.90 # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE BIT SIZE (IN) 12.250 8.500 CASING SIZE (IN) 16.000 9.625 DRILLERS DEPTH (FT) 114.0 3084.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. . . THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELLBORE EXITS THE CD2-21 PB1 WELLBORE AT 8515'MD/5042'TVD. 4. MWD RUN 1 WAS DIRECTIONAL ONLY - NO DATA ARE PRESENTED. 5. MWD RUNS 2,3,5,7,8 COMPRISED DIRECTIONAL; DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4); AND PRESSURE WHILE DRILLING (PWD). RUN 5 ALSO INCLUDED GEOPILOT ROTARY-STEERABLE BHA. RUN 8 ALSO INCLUDED AT-BIT INCLINATION (ABI). MWD RUNS 2 & 3 ALSO INCLUDED POROSITY TOOLS - THESE DATA ARE INCLUDED IN THE CD2-21 PB1 DATASET. 6. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE LOGGING REQUIREMENTS AT CONOCO-PHILLIPS/VENDOR MEETING HELD ON 26 SEPTEMBER 2001. 7. MWD RUNS 1-3,5,7,8 REPRESENT WELL CD2-21 WITH API#: 50-103-20504-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 19359'MD/7175'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). $ RESISTIVITY (EXTRA RESISTIVITY ( SHALLOW RESISTIVITY (MEDIUM RESISTIVITY (DEEP File Header Service name. ....... .....STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .05/02/25 Maximum Physical Record. .65535 File Type........ . . . . . . . . LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE FET RPD RPM RPS RPX GR ROP $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 3053.5 3053.5 3053.5 3053.5 3053.5 3061.0 3095.5 STOP DEPTH 19302.0 19302.0 19302.0 19302.0 19302.0 19295.0 19359.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- . . BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD $ BIT RUN NO 2 3 5 7 8 MERGE TOP 3053.5 7027.0 8515.5 12462.0 13395.0 MERGE BASE 7027.0 8515.0 12462.0 13395.0 19359.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..... .............0 Data Specification Block Type.....O Logging Direction.................Down Optical log depth units.......... .Feet Data Reference Point......... .....Undefined Frame Spacing..................... 60 .1IN Max frames per record......... ... . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3053.5 19359 11206.3 32612 3053.5 19359 ROP MWD FT/H 0.22 690.44 133.411 32528 3095.5 19359 GR MWD API 26.37 381. 6 95.8404 32469 3061 19295 RPX MWD OHMM 0.19 1159.1 10.9289 32498 3053.5 19302 RPS MWD OHMM 0.15 2000 11.2099 32498 3053.5 19302 RPM MWD OHMM 0.12 1809.23 14.7869 32498 3053.5 19302 RPD MWD OHMM 0.34 2000 17.5123 32498 3053.5 19302 FET MWD HOUR 0.16 349.57 1. 58784 32498 3053.5 19302 First Reading For Entire File......... .3053.5 Last Reading For Entire File.......... .19359 File Trailer Service name... ........ ..STSLIB.001 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .05/02/25 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .05/02/25 Maximum Physical Record..65535 File Type. . . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.001 . Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPM RPS RPD FET RPX GR ROP $ 2 . header data for each bit run in separate files. 2 .5000 START DEPTH 3053.5 3053.5 3053.5 3053.5 3053.5 3061. 0 3095.5 STOP DEPTH 6984.5 6984.5 6984.5 6984.5 6984.5 6992.5 7027.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record. .... ........Undefined 03-DEC-04 Insite 66.37 Memory 7027.0 3061.0 7027.0 57.8 63.0 TOOL NUMBER 124725 134758 8.500 3084.0 FloPro/LSND 9.70 43.0 8.0 13000 10.8 1. 500 1.030 1. 300 1. 900 72.0 107.6 72.0 72.0 . . Absent value... . . . . . . . . . . . . . . . . . . . - 999 Depth units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3053.5 7027 5040.25 7948 3053.5 7027 ROP MWD020 FT/H 0.22 302.31 159.328 7864 3095.5 7027 GR MWD020 API 42.08 191.66 122.991 7864 3061 6992.5 RPX MWD020 OHMM 0.19 19.68 4.67696 7863 3053.5 6984.5 RPS MWD020 OHMM 0.15 105.17 4.86841 7863 3053.5 6984.5 RPM MWD020 OHMM 0.12 1809.23 6.32137 7863 3053.5 6984.5 RPD MWD020 OHMM 0.34 2000 14.0765 7863 3053.5 6984.5 FET MWD020 HOUR 0.16 79.76 1.43896 7863 3053.5 6984.5 First Reading For Entire File........ ..3053.5 Last Reading For Entire File.......... .7027 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .05/02/25 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Next File Name. ..... .... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation.......05/02/25 Maximum Physical Record..65535 File Type. . . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPM RPS RPX FET RPD GR ROP $ 3 header data for each bit run in separate files. 3 .5000 START DEPTH 6985.0 6985.0 6985.0 6985.0 6985.0 6993.0 7027.5 STOP DEPTH 8515.0 8515.0 8515.0 8515.0 8515.0 8515.0 8515.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE 08-JAN-05 . SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction....... ......... . Down Optical log depth units.......... .Feet Data Reference Point.......... ....Undefined Frame Spacing.................... .60 .1IN Max frames per record.............Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . Insite 66.37 Memory 8515.0 7027.0 8515.0 59.2 78.8 TOOL NUMBER 124725 134758 8.500 3084.0 LSND 9.80 36.0 9.5 350 6.8 5.000 2.430 4.700 5.200 68.0 147.2 68.0 73.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 6985 8515 7750 3061 6985 8515 ROP MWD030 FT/H 9.25 237.34 153.598 2976 7027.5 8515 GR MWD030 API 72.01 136.41 97.7166 3045 6993 8515 RPX MWD030 OHMM 5.14 11 6.34116 3061 6985 8515 RPS MWD030 OHMM 5.21 10.31 6.39205 3061 6985 8515 . . RPM RPD FET MWD030 OHMM MWD030 OHMM MWD030 HOUR 5.36 5.43 0.25 10.54 10.03 20.25 6.43115 6.50252 1.02761 3061 3061 3061 6985 6985 6985 8515 8515 8515 First Reading For Entire File. . . ...... .6985 Last Reading For Entire File......... ..8515 File Trailer service name.. ...... .....STSLIB.003 Service Sub Level Name... Version Number.... .......1.0.0 Date of Generation...... .05/02/25 Maximum Physical Record. .65535 File Type............... .LO Next File Name...........STSLIB.004 Physical EOF File Header Service name...... ...... .STSLIB.004 service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .05/02/25 Maximum Physical Record..65535 File Type. .. ............ .LO Previous File Name.......STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE ROP FET RPD RPM RPS RPX GR $ 4 header data for each bit run in separate files. 5 .5000 START DEPTH 8515.5 8515.5 8515.5 8515.5 8515.5 8515.5 8515.5 STOP DEPTH 12462.0 12416.5 12416.5 12416.5 12416.5 12416.5 12424.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 2l-JAN-05 Insite 66.37 Memory 12462.0 8515.0 12462.0 59.4 62.0 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 TOOL NUMBER 97054 157645 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 3084.0 # BOREHOLE CONDITIONS MUD TYPE: LSND . . MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 9.80 36.0 10.0 300 6.1 2.100 1. 060 2.350 2.700 68.0 141.8 68.0 68.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . .Down Optical log depth units...... .....Feet Data Reference Point......... .....Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . - 999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD050 FT/H 4 1 68 4 2 GR MWD050 API 4 1 68 8 3 RPX MWD050 OHMM 4 1 68 12 4 RPS MWD050 OHMM 4 1 68 16 5 RPM MWD050 OHMM 4 1 68 20 6 RPD MWD050 OHMM 4 1 68 24 7 FET MWD050 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 8515.5 12462 10488.8 7894 8515.5 12462 ROP MWD050 FT/H 1. 52 332.89 183.8 7894 8515.5 12462 GR MWD050 API 53.81 381. 6 112.824 7818 8515.5 12424 RPX MWD050 OHMM 2.35 16.6 6.53748 7803 8515.5 12416.5 RPS MWD050 OHMM 2.49 14.71 6.48944 7803 8515.5 12416.5 RPM MWD050 OHMM 2.68 14.4 6.70434 7803 8515.5 12416.5 RPD MWD050 OHMM 2.68 13 .56 6.95008 7803 8515.5 12416.5 FET MWD050 HOUR 0.17 349.57 0.550771 7803 8515.5 12416.5 First Reading For Entire File..........8515.5 Last Reading For Entire File.. ........ .12462 File Trailer Service name. ............STSLIB.004 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .05/02/25 Maximum Physical Record..65535 File Type............... .LO Next File Name...... .....STSLIB.005 Physical EOF File Header . Service name.............STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation.......05/02/25 Maximum Physical Record..65535 File Type.... . . . . .... . . . .LO Previous File Name.......STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPM RPS RPD FET RPX GR ROP $ 5 . header data for each bit run in separate files. 7 .5000 START DEPTH 12417.0 12417.0 12417.0 12417.0 12417.0 12424.5 12462.5 STOP DEPTH 13346.5 13346.5 13346.5 13346.5 13346.5 13354.0 13395.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record 24-JAN-05 Insite 66.37 Memory 13395.0 12462.0 13395.0 62.7 87.1 TOOL NUMBER 97054 157645 8.500 3084.0 LSND 9.80 41. 0 9.6 400 3.6 1.200 .600 2.100 1.700 68.0 145.0 68.0 68.0 . . Data Record Type. .................0 Data Specification Block Type.....O Logging Direction........ ........ . Down Optical log depth units.......... . Feet Data Reference Point...... ... .....Undefined Frame Spacing........... ......... .60 .1IN Max frames per record.. . . . . . . ... . .Undefined Absent value..................... .-999 Depth units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD070 FT/H 4 1 68 4 2 GR MWD070 API 4 1 68 8 3 RPX MWD070 OHMM 4 1 68 12 4 RPS MWD070 OHMM 4 1 68 16 5 RPM MWD070 OHMM 4 1 68 20 6 RPD MWD070 OHMM 4 1 68 24 7 FET MWD070 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 12417 13395 12906 1957 12417 13395 ROP MWD070 FT/H 1.18 690.44 105.964 1866 12462.5 13395 GR MWD070 API 49.12 309.07 139.496 1860 12424.5 13354 RPX MWD070 OHMM 2.57 18.19 4.80244 1860 12417 13346.5 RPS MWD070 OHMM 2.58 18.48 5.10353 1860 12417 13346.5 RPM MWD070 OHMM 2.68 23.15 6.20913 1860 12417 13346.5 RPD MWD070 OHMM 3.04 23.49 6.46473 1860 12417 13346.5 FET MWD070 HOUR 0.34 49.64 3.30738 1860 12417 13346.5 First Reading For Entire File..........12417 Last Reading For Entire File. ......... .13395 File Trailer Service name... ... ...... .STSLIB.005 Service Sub Level Name... version Number.......... .1.0.0 Date of Generation...... .05/02/25 Maximum Physical Record..65535 File Type.... ............LO Next File Name.......... .STSLIB.006 Physical EOF File Header Service name............ .STSLIB.006 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation.... ...05/02/25 Maximum Physical Record. .65535 File Type...... . . . ., . . .. .LO Previous File Name.......STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET 6 header data for each bit run in separate files. 8 .5000 START DEPTH 13347.0 13347.0 13347.0 13347.0 13347.0 STOP DEPTH 19302.0 19302.0 19302.0 19302.0 19302.0 . GR ROP $ 13354.5 13395.5 19295.0 19359.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.. ........... .....0 Data Specification Block Type.....O Logging Direction......... ....... . Down Optical log depth units.......... .Feet Data Reference Point......... .....Undefined Frame Spacing..................... 60 .1IN Max frames per record............ . Undefined Absent value.... . . . . . . . . . . . . . . . . . . - 999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . 03-FEB-05 Insite 66.37 Memory 19359.0 13395.0 19359.0 88.4 93.8 TOOL NUMBER 87224 130908 8.500 13382.0 oil Based 9.10 52.0 .0 39000 6.4 .000 .000 .000 .000 .0 176.0 .0 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD080 FT/H 4 1 68 4 2 GR MWD080 API 4 1 68 8 3 RPX MWD080 OHMM 4 1 68 12 4 RPS MWD080 OHMM 4 1 68 16 5 RPM MWD080 OHMM 4 1 68 20 6 RPD MWD080 OHMM 4 1 68 24 7 FET MWD080 HOUR 4 1 68 28 8 ~ ' . . First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13347 19359 16353 12025 13347 19359 ROP MWD080 FT/H 0.94 546.94 82.2328 11928 13395.5 19359 GR MWD080 API 26.37 137.63 59.3815 11882 13354.5 19295 RPX MWD080 OHMM 2.5 1159.1 20.0685 11911 13347 19302 RPS MWD080 OHMM 2.75 2000 20.6803 11911 13347 19302 RPM MWD080 OHMM 2.91 1768.03 29.1573 11911 13347 19302 RPD MWD080 OHMM 3.16 2000 31.2543 11911 13347 19302 FET MWD080 HOUR 0.38 114.43 2.24097 11911 13347 19302 First Reading For Entire File......... .13347 Last Reading For Entire File. ......... .19359 File Trailer Service name............ .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .05/02/25 Maximum Physical Record..65535 File Type.. .. .. .. .. .. .. .. LO Next File Name.......... .STSLIB.007 Physical EOF Tape Trailer Service name... .... ..... .LISTPE Date. . . . . . . . . . . . . . . . . . . . .05/02/25 Origin.................. .STS Tape Name............... . UNKNOWN Continuation Number......01 Next Tape Name..... . . ... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name. . . . . . . . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .05/02/25 Origin..... ..............STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments..... ...... ..... .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End of LIS File