Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
219-103
Suspended Well Inspection Review Report Reviewed By: P.I. Suprv Comm ________ JBR 11/03/2025 InspectNo:susKPS250909141800 Well Pressures (psi): Date Inspected:9/8/2025 Inspector:Kam StJohn If Verified, How?Other (specify in comments) Suspension Date:11/10/2019 Tubing:0 IA:0 OA:0 Operator:Hilcorp Alaska, LLC Operator Rep:Gus Wik Date AOGCC Notified:9/5/2025 Type of Inspection:Subsequent Well Name:GRANITE POINT 55RD Permit Number:2191030 Wellhead Condition Clean no leak and gauges were in operable condition Surrounding Surface Condition Clean with no sign of leaks Condition of Cellar Offshore platform; no cellar Comments Location verified by well slot schematic Supervisor Comments Photos (2) attached Suspension Approval:Completion Report Location Verified? Offshore? Fluid in Cellar? Wellbore Diagram Avail? Photos Taken? VR Plug(s) Installed? BPV Installed? Monday, November 3, 2025 2025-0908_Suspend_GranitePt_GPP_55RD_photos_ksj Page 1 of 1 Suspended Well Inspection – Granite Pt GPP 55RD PTD 2191030 AOGCC Inspection Rpt # susKPS250909141800 Photos by AOGCC Inspector K. StJohn 9/8/2025 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:Drlg DYNAMICS, ANNULAR PRESSURE/MPR,COMP NEUTRON PORE, GR/ PB1,2,3, mudlogsNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScaleC12/17/20190 10756 Electronic Data Set, Filename: DD_Depth_MEM_0.25_Hilcorp_GP-55RD.las31674EDDigital DataC12/17/2019 Electronic Data Set, Filename: DD_Time_Run11_MEM_60s_Hilcorp_GP-55RD.las31674EDDigital DataC12/17/2019 Electronic Data Set, Filename: DD_Time_Run12_MEM_60s_Hilcorp_GP-55RD.las31674EDDigital DataC12/17/20190 10756 Electronic Data Set, Filename: FE_MEM_0.25_Hilcorp_GP-55RD.las31674EDDigital DataC12/17/2019 Electronic File: DD_TIME_MEM_Hilcorp_GP-55RD.cgm31674EDDigital DataC12/17/2019 Electronic File: FE_MD2MEM_Hilcorp_GP-55RD.cgm31674EDDigital DataC12/17/2019 Electronic File: FE_MD5MEM_Hilcorp_GP-55RD.cgm31674EDDigital DataC12/17/2019 Electronic File: FE_TVD2MEM_Hilcorp_GP-55RD.cgm31674EDDigital DataC12/17/2019 Electronic File: FE_TVD5MEM_Hilcorp_GP-55RD.cgm31674EDDigital DataC12/17/2019 Electronic File: VSS_MD5MEM_Hilcorp_GP-55RD.cgm31674EDDigital DataC12/17/2019 Electronic File: DD_TIME_MEM_Hilcorp_GP-55RD.pdf31674EDDigital DataC12/17/2019 Electronic File: FE_MD2MEM_Hilcorp_GP-55RD.pdf31674EDDigital DataTuesday, January 5, 2021AOGCCPage 1 of 19Supplied byOPSupplied byOP,FE_MEM_0.25_Hilcorp_GP-55RD.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoC12/17/2019 Electronic File: FE_MD5MEM_Hilcorp_GP-55RD.pdf31674EDDigital DataC12/17/2019 Electronic File: FE_TVD2MEM_Hilcorp_GP-55RD.pdf31674EDDigital DataC12/17/2019 Electronic File: FE_TVD5MEM_Hilcorp_GP-55RD.pdf31674EDDigital DataC12/17/2019 Electronic File: VSS_MD5MEM_Hilcorp_GP-55RD.pdf31674EDDigital DataC12/17/2019 Electronic File: MWD_Surveys_17-10756.pdf31674EDDigital DataC12/17/2019 Electronic File: MWD_Surveys_17-10756.txt31674EDDigital DataC12/17/2019 Electronic File: DD_TIME_MEM_Hilcorp_GP-55RD.tif31674EDDigital DataC12/17/2019 Electronic File: FE_MD2MEM_Hilcorp_GP-55RD.tif31674EDDigital DataC12/17/2019 Electronic File: FE_MD5MEM_Hilcorp_GP-55RD.tif31674EDDigital DataC12/17/2019 Electronic File: FE_TVD2MEM_Hilcorp_GP-55RD.tif31674EDDigital DataC12/17/2019 Electronic File: FE_TVD5MEM_Hilcorp_GP-55RD.tif31674EDDigital DataC12/17/2019 Electronic File: VSS_MD5MEM_Hilcorp_GP-55RD.tif31674EDDigital Data0 0 2191030 GRANITE POINT 55RD LOG HEADERS31674LogLog Header Scans0 0 2191030 GRANITE POINT 55RD PB1 LOG HEADERS31675LogLog Header ScansDF12/9/20205004 10345 Electronic Data Set, Filename: DD_Depth_MEM_0.25_Hilcorp_GP-55RD-PB1.las31675EDDigital DataDF12/9/20205000 10345 Electronic Data Set, Filename: FE_MEM_0.25_Hilcorp_GP-55RD-PB1.las31675EDDigital DataDF12/9/2020 Electronic File: DD_TIME_MEM_Hilcorp_GP-55RD-PB1.pdf31675EDDigital DataDF12/9/2020 Electronic File: FE_MD2MEM_Hilcorp_GP-55RD-PB1.pdf31675EDDigital DataTuesday, January 5, 2021AOGCCPage 2 of 19,FE_MEM_0.25_Hilcorp_GP-55RD-PB1.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/9/2020 Electronic File: FE_MD5MEM_Hilcorp_GP-55RD-PB1.pdf31675EDDigital DataDF12/9/2020 Electronic File: FE_TVD2MEM_Hilcorp_GP-55RD-PB1.pdf31675EDDigital DataDF12/9/2020 Electronic File: FE_TVD5MEM_Hilcorp_GP-55RD-PB1.pdf31675EDDigital DataDF12/9/2020 Electronic File: GP-55RD-PB1_Surveys.pdf31675EDDigital DataDF12/9/2020 Electronic File: GP-55RD-PB1_Surveys.txt31675EDDigital DataDF12/9/2020 Electronic File: VSS_MD5MEM_Hilcorp_GP-55RD-PB1.pdf31675EDDigital DataDF0 0 DD_Time_Run1_MEM_60s_Hilcorp_GP-55RD-PB1.las31675EDDigital DataDF0 0 DD_Time_Run2_MEM_60s_Hilcorp_GP-55RD-PB1.las31675EDDigital Data0 0 2191030 GRANITE POINT 55RD PB2 LOG HEADERS31676LogLog Header ScansDF12/9/20205004 10686 Electronic Data Set, Filename: DD_Depth_MEM_0.25_Hilcorp_GP-55RD-PB2.las31676EDDigital DataDF12/9/2020 Electronic Data Set, Filename: DD_Time_Run3_MEM_60s_Hilcorp_GP-55RD-PB2.las31676EDDigital DataDF12/9/2020 Electronic Data Set, Filename: DD_Time_Run4_MEM_60s_Hilcorp_GP-55RD-PB2.las31676EDDigital DataDF12/9/2020 Electronic Data Set, Filename: DD_Time_Run6_MEM_60s_Hilcorp_GP-55RD-PB2.las31676EDDigital DataDF12/9/20205000 10686 Electronic Data Set, Filename: FE_MEM_0.25_Hilcorp_GP-55RD-PB2.las31676EDDigital DataDF12/9/2020 Electronic File: DD_TIME_MEM_Hilcorp_GP-55RD-PB2.pdf31676EDDigital DataDF12/9/2020 Electronic File: FE_MD2MEM_Hilcorp_GP-55RD-PB2.pdf31676EDDigital DataDF12/9/2020 Electronic File: FE_MD5MEM_Hilcorp_GP-55RD-PB2.pdf31676EDDigital DataTuesday, January 5, 2021AOGCCPage 3 of 19,FE_MEM_0.25_Hilcorp_GP-55RD-PB2.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/9/2020 Electronic File: FE_TVD2MEM_Hilcorp_GP-55RD-PB2.pdf31676EDDigital DataDF12/9/2020 Electronic File: FE_TVD5MEM_Hilcorp_GP-55RD-PB2.pdf31676EDDigital DataDF12/9/2020 Electronic File: GP-55RD-PB2_Surveys.pdf31676EDDigital DataDF12/9/2020 Electronic File: GP-55RD-PB2_Surveys.txt31676EDDigital DataDF12/9/2020 Electronic File: VSS_MD5MEM_Hilcorp_GP-55RD-PB2.pdf31676EDDigital Data0 0 2191030 GRANITE POINT 55RD PB3 LOG HEADERS31677LogLog Header ScansDF12/9/20205004 11047 Electronic Data Set, Filename: DD_Depth_MEM_0.25_Hilcorp_GP-55RD PB3.las31677EDDigital DataDF12/9/20201790 11047 Electronic Data Set, Filename: DD_Time_Run10_MEM_60s_Hilcorp_GP-55RD PB3.las31677EDDigital DataDF12/9/20205000 11047 Electronic Data Set, Filename: FE_MEM_0.25_Hilcorp_GP-55RD PB3.las31677EDDigital DataDF12/9/2020 Electronic File: FE_MD2MEM_Hilcorp_GP-55RD PB3.pdf31677EDDigital DataDF12/9/2020 Electronic File: FE_MD5MEM_Hilcorp_GP-55RD PB3.pdf31677EDDigital DataDF12/9/2020 Electronic File: FE_TVD2MEM_Hilcorp_GP-55RD PB3.pdf31677EDDigital DataDF12/9/2020 Electronic File: FE_TVD5MEM_Hilcorp_GP-55RD PB3.pdf31677EDDigital DataDF12/9/2020 Electronic File: GP-55RD PB3_Surveys.pdf31677EDDigital DataDF12/9/2020 Electronic File: GP-55RD_PB3_Surveys.txt31677EDDigital DataDF12/9/2020 Electronic File: VSS_MD5MEM_Hilcorp_GP-55RD PB3.pdf31677EDDigital DataDF12/9/2020 Electronic File: VSS_TIME_MEM_Hilcorp_GP-55RD PB3.pdf31677EDDigital Data0 0 2191030 GRANITE POINT 55RD LOG HEADERS34395LogLog Header ScansDF12/29/20206400 10800 Electronic Data Set, Filename: GP-55 RD.las34395EDDigital DataTuesday, January 5, 2021AOGCCPage 4 of 19,FE_MEM_0.25_Hilcorp_GP-55RD PB3.lasGP-55 RD.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/29/2020 Electronic File: GP 55RD Daily Reports.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD Final Well Report.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP 55RD - 5in Formation Log MD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP 55RD - 5in Formation Log TVD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - 5in Drilling Dynamics Log MD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - 5in Drilling Dynamics Log TVD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - 5in Gas Ratio Log MD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - 5in Gas Ratio Log TVD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - 5in LWD Combo Log MD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - 5in LWD Combo Log TVD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - Drilling Dynamics Log MD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - Drilling Dynamics Log TVD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - Formation Log MD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - Formation Log TVD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - Gas Ratio Log MD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - Gas Ratio Log TVD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - LWD Combo Log MD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - LWD Combo Log TVD.pdf34395EDDigital DataDF12/29/2020 Electronic File: GP 55RD - 5in Formation Log MD.tif34395EDDigital DataTuesday, January 5, 2021AOGCCPage 5 of 19 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/29/2020 Electronic File: GP 55RD - 5in Formation Log TVD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - 5in Drilling Dynamics Log MD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - 5in Drilling Dynamics Log TVD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - 5in Gas Ratio Log MD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - 5in Gas Ratio Log TVD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - 5in LWD Combo Log MD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - 5in LWD Combo Log TVD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - Drilling Dynamics Log MD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - Drilling Dynamics Log TVD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - Formation Log MD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - Formation Log TVD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - Gas Ratio Log MD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - Gas Ratio Log TVD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - LWD Combo Log MD.tif34395EDDigital DataDF12/29/2020 Electronic File: GP-55RD - LWD Combo Log TVD.tif34395EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10420'.jpg34395EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10421'.jpg34395EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10440'.jpg34395EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10500'.jpg34395EDDigital DataTuesday, January 5, 2021AOGCCPage 6 of 19 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10530'.jpg34395EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10560'.jpg34395EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10590'.jpg34395EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10620'.jpg34395EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10650'.jpg34395EDDigital DataDF12/29/20206400 10360 Electronic Data Set, Filename: GP-55RD_PB1.las34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Drilling Dynamics Log MD 2in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Drilling Dynamics Log MD 5in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Drilling Dynamics Log TVD 2in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Drilling Dynamics Log TVD 5in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Formation Log MD 2in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Formation Log MD 5in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Formation Log TVD 2in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Formation Log TVD 5in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Gas Ratio Log MD 2in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Gas Ratio Log MD 5in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Gas Ratio Log TVD 2in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Gas Ratio Log TVD 5in.pdf34396EDDigital DataTuesday, January 5, 2021AOGCCPage 7 of 19GP-55RD_PB1.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/29/2020 Electronic File: GP 55RD PB1 LWD Combo Log MD 2in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 LWD Combo Log MD 5in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 LWD Combo Log TVD 2in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 LWD Combo Log TVD 5in.pdf34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Drilling Dynamcis Log MD 2in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Drilling Dynamcis Log MD 5in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Drilling Dynamcis Log TVD 2in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Drilling Dynamcis Log TVD 5in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Formation Log MD 2in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Formation Log MD 5in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Formation Log TVD 2in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Formation Log TVD 5in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Gas Ratio Log MD 2in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Gas Ratio Log MD 5in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Gas Ratio Log TVD 2in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 Gas Ratio Log TVD 5in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 LWD Combo Log MD 2in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 LWD Combo Log MD 5in.tif34396EDDigital DataTuesday, January 5, 2021AOGCCPage 8 of 19 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/29/2020 Electronic File: GP 55RD PB1 LWD Combo Log TVD 2in.tif34396EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB1 LWD Combo Log TVD 5in.tif34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 09840'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 09870'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 09900'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 09930'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 09960'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 09990'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10020'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10050'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10080'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10110'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10140'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10170'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10190'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10200'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10210'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10220'.jpg34396EDDigital DataTuesday, January 5, 2021AOGCCPage 9 of 19 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10230'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10240'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10250'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10255' sp.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10260'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10270'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10280'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10290'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10300'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10310'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10320'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10330'.jpg34396EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD PB1 10345' Lost Circ.jpg34396EDDigital Data0 0 2191030 GRANITE POINT 55RD PB1 LOG HEADERS34396LogLog Header Scans0 0 2191030 GRANITE POINT 55RD PB2 LOG HEADERS34397LogLog Header ScansDF12/29/20206400 10720 Electronic Data Set, Filename: GP-55RD PB2.las34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Drilling Dynamics Log MD 2in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Drilling Dynamics Log MD 5in.pdf34397EDDigital DataTuesday, January 5, 2021AOGCCPage 10 of 19GP-55RD PB2.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/29/2020 Electronic File: GP 55RD PB2 Drilling Dynamics Log TVD 2in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Drilling Dynamics Log TVD 5in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Formation Log MD 2in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Formation Log MD 5in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Formation Log TVD 2in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Formation Log TVD 5in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Gas Ratio Log MD 2in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Gas Ratio Log MD 5in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Gas Ratio Log TVD 2in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Gas Ratio Log TVD 5in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 LWD Combo Log MD 2in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 LWD Combo Log MD 5in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 LWD Combo Log TVD 2in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 LWD Combo Log TVD 5in.pdf34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Drilling Dynamics Log MD 2in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Drilling Dynamics Log MD 5in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Drilling Dynamics Log TVD 2in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Drilling Dynamics Log TVD 5in.tif34397EDDigital DataTuesday, January 5, 2021AOGCCPage 11 of 19 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/29/2020 Electronic File: GP 55RD PB2 Formation Log MD 2in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Formation Log MD 5in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Formation Log TVD 2in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Formation Log TVD 5in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Gas Ratio Log MD 2in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Gas Ratio Log MD 5in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Gas Ratio Log TVD 2in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 Gas Ratio Log TVD 5in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 LWD Combo Log MD 2in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 LWD Combo Log MD 5in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 LWD Combo Log TVD 2in.tif34397EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB2 LWD Combo Log TVD 5in.tif34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09510'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09540'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09570'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09600'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09630'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09660'.jpg34397EDDigital DataTuesday, January 5, 2021AOGCCPage 12 of 19 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09690'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09720'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09750'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09780'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09810'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09840'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09870'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09900'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09930'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09960'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 09990'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10020'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10050'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10080'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10110'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10140'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10170'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10200'.jpg34397EDDigital DataTuesday, January 5, 2021AOGCCPage 13 of 19 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10230'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10260'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10290'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10320'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10350'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10380'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10410'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10440'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10470'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10500'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10530'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10560'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10590'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10614'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10650'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10680'.jpg34397EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10685'.jpg34397EDDigital DataDF12/29/20206400 11044 Electronic Data Set, Filename: GP-55 RD PB3.las34398EDDigital DataTuesday, January 5, 2021AOGCCPage 14 of 19GP-55 RDPB3.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/29/2020 Electronic File: GP 55RD PB3 Drilling Dynamics Log MD 2in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Drilling Dynamics Log MD 5in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Drilling Dynamics Log TVD 2in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Drilling Dynamics Log TVD 5in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Formation Log MD 2in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Formation Log MD 5in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Formation Log TVD 2in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Formation Log TVD 5in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Gas Ratio Log MD 2in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Gas Ratio Log MD 5in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Gas Ratio Log TVD 2in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Gas Ratio Log TVD 5in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 LWD Combo Log MD 2in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 LWD Combo Log MD 5in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 LWD Combo Log TVD 2in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 LWD Combo Log TVD 5in.pdf34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Drilling Dynamics Log MD 2in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Drilling Dynamics Log MD 5in.tif34398EDDigital DataTuesday, January 5, 2021AOGCCPage 15 of 19 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/29/2020 Electronic File: GP 55RD PB3 Drilling Dynamics Log TVD 2in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Drilling Dynamics Log TVD 5in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Formation Log MD 2in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Formation Log MD 5in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Formation Log TVD 2in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Formation Log TVD 5in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Gas Ratio Log MD 2in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Gas Ratio Log MD 5in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Gas Ratio Log TVD 2in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 Gas Ratio Log TVD 5in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 LWD Combo Log MD 2in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 LWD Combo Log MD 5in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 LWD Combo Log TVD 2in.tif34398EDDigital DataDF12/29/2020 Electronic File: GP 55RD PB3 LWD Combo Log TVD 5in.tif34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10,920'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10397'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10400'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10401.jpg34398EDDigital DataTuesday, January 5, 2021AOGCCPage 16 of 19 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10402'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10404'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10406'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10408'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10410'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10415'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10420'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10424'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10440'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10470'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10500'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10530'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10560'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10590'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10620'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10650'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10680'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10710'.jpg34398EDDigital DataTuesday, January 5, 2021AOGCCPage 17 of 19 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoWell Cores/Samples Information:ReceivedStart Stop CommentsTotalBoxesSample SetNumberNameIntervalINFORMATION RECEIVEDDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10720'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10740'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10750'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10770'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10830'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10860'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10890'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10950' .jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 10980'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 11010'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 11040'.jpg34398EDDigital DataDF12/29/2020 Electronic File: Hilcorp Alaska LLC GP 55RD 11800'.jpg34398EDDigital Data0 0 2191030 GRANITE POINT 55RD PB3 LOG HEADERS34398LogLog Header Scans12/12/20199240 10740 Mainbore11729Cuttings12/12/20199810 10685 PB1: 9810-10345, PB2: 10380-10685 in same box1 170Cuttings12/12/201910380 11040 PB311731CuttingsTuesday, January 5, 2021AOGCCPage 18 of 19 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-733-20479-01-00Well Name/No. GRANITE POINT 55RDCompletion StatusSUSPCompletion Date11/10/2019Permit to Drill2191030Operator Hilcorp Alaska, LLCMD10756TVD9489Current StatusSUSP1/5/2021UICNoCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYComments:Compliance Reviewed By:Date:Mud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYDate CommentsDescriptionCompletion Date: 11/10/2019Release Date:7/31/2019Tuesday, January 5, 2021AOGCCPage 19 of 19M. Guhl1/5/2021 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: Date: 12/29/2020 To: Alaska Oil & Gas Conservation Commission Natural Resources Technician 333 W. 7th Ave. Ste#100 Anchorage, AK 99501 DATA RESUBMITTAL GP-55RD + PB1, PB2, PB3 (PTD 219-103) NABORS: EOW REPORTS - MUDLOGS (09/17/2019 - 11/11/2019) 1.DAILY DRILLING REPORTS 2.FINAL EOW REPORT 3.LWD LOG PRINTS 4.MUDLOG PRINTS 5.LAS DATA FILES 6.SAMPLE PHOTOGRAPHY Folder Contents: PB1, PB2, PB3 Subfolder Contents: Please include current contact information if different from above. PTD: 2191030 E-Set: 34395 Received by the AOGCC 12/29/2020 Abby Bell 1/04/2021 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: Date: 12/14/2020 To: Alaska Oil & Gas Conservation Commission Natural Resources Technician 333 W. 7th Ave. Ste#100 Anchorage, AK 99501 DATA TRANSMITTAL GP 55RD + PB1, PB2, PB3 (PTD 219-103) NABORS: EOW REPORTS - MUDLOGS (11/11/2019) 1.DAILY DRILLING REPORTS 2.FINAL EOW REPORT 3.LWD LOG PRINTS 4.MUDLOG PRINTS 5.LAS DATA FILES 6.SAMPLE PHOTOGRAPHY Folder Contents: PB1, PB2, PB3 Subfolder Contents: Please include current contact information if different from above. Received by the AOGCC 12/16/2020 PTD: 2191030 E-Set: 34395 Abby Bell 12/16/2020 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: Date: 12/29/2020 To: Alaska Oil & Gas Conservation Commission Natural Resources Technician 333 W. 7th Ave. Ste#100 Anchorage, AK 99501 DATA RESUBMITTAL GP-55RD + PB1, PB2, PB3 (PTD 219-103) NABORS: EOW REPORTS - MUDLOGS (09/17/2019 - 11/11/2019) 1.DAILY DRILLING REPORTS 2.FINAL EOW REPORT 3.LWD LOG PRINTS 4.MUDLOG PRINTS 5.LAS DATA FILES 6.SAMPLE PHOTOGRAPHY Folder Contents: PB1, PB2, PB3 Subfolder Contents: Please include current contact information if different from above. PTD: 2191030 E-Set: 34396 Received by the AOGCC 12/29/2020 Abby Bell 01/04/2021 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: Date: 12/14/2020 To: Alaska Oil & Gas Conservation Commission Natural Resources Technician 333 W. 7th Ave. Ste#100 Anchorage, AK 99501 DATA TRANSMITTAL GP 55RD + PB1, PB2, PB3 (PTD 219-103) NABORS: EOW REPORTS - MUDLOGS (11/11/2019) 1.DAILY DRILLING REPORTS 2.FINAL EOW REPORT 3.LWD LOG PRINTS 4.MUDLOG PRINTS 5.LAS DATA FILES 6.SAMPLE PHOTOGRAPHY Folder Contents: PB1, PB2, PB3 Subfolder Contents: Please include current contact information if different from above. Received by the AOGCC 12/16/2020 PTD: 2191030 E-Set: 34396 Abby Bell 12/16/2020 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: Date: 12/29/2020 To: Alaska Oil & Gas Conservation Commission Natural Resources Technician 333 W. 7th Ave. Ste#100 Anchorage, AK 99501 DATA RESUBMITTAL GP-55RD + PB1, PB2, PB3 (PTD 219-103) NABORS: EOW REPORTS - MUDLOGS (09/17/2019 - 11/11/2019) 1.DAILY DRILLING REPORTS 2.FINAL EOW REPORT 3.LWD LOG PRINTS 4.MUDLOG PRINTS 5.LAS DATA FILES 6.SAMPLE PHOTOGRAPHY Folder Contents: PB1, PB2, PB3 Subfolder Contents: Please include current contact information if different from above. PTD: 2191030 E-Set: 34397 Received by the AOGCC 12/29/2020 Abby Bell 01/04/2021 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: Date: 12/14/2020 To: Alaska Oil & Gas Conservation Commission Natural Resources Technician 333 W. 7th Ave. Ste#100 Anchorage, AK 99501 DATA TRANSMITTAL GP 55RD + PB1, PB2, PB3 (PTD 219-103) NABORS: EOW REPORTS - MUDLOGS (11/11/2019) 1.DAILY DRILLING REPORTS 2.FINAL EOW REPORT 3.LWD LOG PRINTS 4.MUDLOG PRINTS 5.LAS DATA FILES 6.SAMPLE PHOTOGRAPHY Folder Contents: PB1, PB2, PB3 Subfolder Contents: Please include current contact information if different from above. Received by the AOGCC 12/16/2020 PTD: 2191030 E-Set: 34397 Abby Bell 12/16/2020 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: Date: 12/29/2020 To: Alaska Oil & Gas Conservation Commission Natural Resources Technician 333 W. 7th Ave. Ste#100 Anchorage, AK 99501 DATA RESUBMITTAL GP-55RD + PB1, PB2, PB3 (PTD 219-103) NABORS: EOW REPORTS - MUDLOGS (09/17/2019 - 11/11/2019) 1.DAILY DRILLING REPORTS 2.FINAL EOW REPORT 3.LWD LOG PRINTS 4.MUDLOG PRINTS 5.LAS DATA FILES 6.SAMPLE PHOTOGRAPHY Folder Contents: PB1, PB2, PB3 Subfolder Contents: Please include current contact information if different from above. PTD: 2191030 E-Set: 34398 Received by the AOGCC 12/29/2020 Abby Bell 01/04/2021 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: Date: 12/14/2020 To: Alaska Oil & Gas Conservation Commission Natural Resources Technician 333 W. 7th Ave. Ste#100 Anchorage, AK 99501 DATA TRANSMITTAL GP 55RD + PB1, PB2, PB3 (PTD 219-103) NABORS: EOW REPORTS - MUDLOGS (11/11/2019) 1.DAILY DRILLING REPORTS 2.FINAL EOW REPORT 3.LWD LOG PRINTS 4.MUDLOG PRINTS 5.LAS DATA FILES 6.SAMPLE PHOTOGRAPHY Folder Contents: PB1, PB2, PB3 Subfolder Contents: Please include current contact information if different from above. Received by the AOGCC 12/16/2020 PTD: 2191030 E-Set: 34398 Abby Bell 12/16/2020 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: Date: 12/08/2020 To: Alaska Oil & Gas Conservation Commission Natural Resources Technician 333 W. 7th Ave. Ste#100 Anchorage, AK 99501 RESUBMISSION DATA TRANSMITTAL (PTD 219-103) GP 55RDPB1 (09/15/2019 to 09/26/2019) GP 55RDPB2 (09/30/2019 to 10/09/2019) GP 55RDPB3 (09/30/2019 to 10/25/2019) Folder File Contents: •Final LWD Log Prints (2” & 5” MD & TVD) •Final Definitive Directional Survey •Digital Data Load Files (LAS and Text) Please include current contact information if different from above. Received by the AOGCC 12/09/2020 PTD: 2191030 E-Set: 31675 Abby Bell 12/09/2020 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: Date: 12/08/2020 To: Alaska Oil & Gas Conservation Commission Natural Resources Technician 333 W. 7th Ave. Ste#100 Anchorage, AK 99501 RESUBMISSION DATA TRANSMITTAL (PTD 219-103) GP 55RDPB1 (09/15/2019 to 09/26/2019) GP 55RDPB2 (09/30/2019 to 10/09/2019) GP 55RDPB3 (09/30/2019 to 10/25/2019) Folder File Contents: •Final LWD Log Prints (2” & 5” MD & TVD) •Final Definitive Directional Survey •Digital Data Load Files (LAS and Text) Please include current contact information if different from above. Received by the AOGCC 12/09/2020 PTD: 2191030 E-Set:31676 Abby Bell 12/09/2020 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: Date: 12/08/2020 To: Alaska Oil & Gas Conservation Commission Natural Resources Technician 333 W. 7th Ave. Ste#100 Anchorage, AK 99501 RESUBMISSION DATA TRANSMITTAL (PTD 219-103) GP 55RDPB1 (09/15/2019 to 09/26/2019) GP 55RDPB2 (09/30/2019 to 10/09/2019) GP 55RDPB3 (09/30/2019 to 10/25/2019) Folder File Contents: •Final LWD Log Prints (2” & 5” MD & TVD) •Final Definitive Directional Survey •Digital Data Load Files (LAS and Text) Please include current contact information if different from above. Received by the AOGCC 12/09/2020 PTD: 2191030 E-Set:31677 Abby Bell 12/09/2020 1a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: _0 Service Stratigraphic Test 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: Top of Productive Interval: 9. Ref Elevations: KB: 17. Field / Pool(s): GL: N/A BF: N/A Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y- Zone- 4 TPI: x- y- Zone- 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y- Zone- 4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 (ft MSL) 22. Logs Obtained: 23. BOTTOM 7" L-80 9,345' 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MCF: Test Period Casing Press: Calculated Gas-MCF: Oil Gravity - API (corr): Press. 24-Hour Rate November 4, 2019 September 14, 2019 ADL 018761 LOCI 19-001 N/A 10,395' MD / 9,345' TVD75 N/A 10,756' MD / 9,489' TVD Drlg DYNAMICS, ANNULAR PRESSURE/MPR,COMP NEUTRON PORE, GR/ PB1,2,3 Sr Res EngSr Pet GeoSr Pet Eng Oil-Bbl: Water-Bbl: Oil-Bbl: suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary N/A Water-Bbl: PRODUCTION TEST N/A Date of Test: Flow Tubing 29# 10,395' Gas-Oil Ratio:Choke Size: Per 20 AAC 25.283 (i)(2) attach electronic information DEPTH SET (MD) N/A PACKER SET (MD/TVD) CASING WT. PER FT.GRADE N/A 260713 TOP SETTING DEPTH MD 4,796' SETTING DEPTH TVD 2541963 BOTTOM TOP 3,975' HOLE SIZE AMOUNT PULLED 50-733-20479-01-00 Granite Point 55RD 263339 2544494 N/A CEMENTING RECORD 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 11/10/2019 2437' FNL, 1303' FWL, Sec 13, T10N, R12W, SM, AK 259' FSL, 1269' FEL, Sec 14, T10N, R12W, SM, AK 219-103 / 320-441 Granite Point Field / Middle Kenai Oil Pool 132' 10,196' MD / 9,005' TVD STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Hilcorp Alaska, LLC WAG Gas 8-3/8" T - 316 sx 492' 2-7/8" SIZEIf Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): ACID, FRACTURE, CEMENT SQUEEZE, ETC. CASING, LINER AND CEMENTING RECORD List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, TUBING RECORD WINJ SPLUG Other Abandoned Suspended Stratigraphic Test No No (attached) No Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment By Samantha Carlisle at 9:19 am, Nov 03, 2020 RBDMS HEW 11/5/2020 Suspension Date 11/10/2019 HEW SFD 11/9/2020 Suspended /319-490/ 319-513 DSR-11/10/2020gls 12/14/20 G mudlogs MDG 12/14/20 Conventional Core(s): Yes No Sidewall Cores: 30. MD TVD N/A N/A Top of Productive Interval N/A N/A 9,892' 8,698' 9,949' 8,767' 10,174' 8,982' 10,671' 9,426' Tyonek 31. List of Attachments: 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Cody Dinger Contact Email:cdinger@hilcorp.com Authorized Contact Phone: 777-8389 General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment, whichever occurs first. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Formation at total depth: C7A Wellbore Schematic, Drilling Reports, Definitive Directional Surveys, Csg and Cmt Reports, OH ST Summary Signature w/Date: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. INSTRUCTIONS Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. TPI (Top of Producing Interval). Yes No Well tested? Yes No 28. CORE DATA If yes, list intervals and formations tested, briefly summarizing test results. Attach separate pages to this form, if needed, and submit detailed test information, including reports, per 20 AAC 25.071. NAME C2C C5A C2B This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inc lination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. Authorized Name: Monty Myers Authorized Title: Drilling Manager Permafrost - Base 29. GEOLOGIC MARKERS (List all formations and markers encountered): FORMATION TESTS Permafrost - Top No NoSidewall Cores: Yes No Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment Digitally signed by Monty M Myers DN: cn=Monty M Myers, c=US, o=Hilcorp Alaska, LLC, ou=Technical Services - AK Drilling, email=mmyers@hilcorp.com Reason: I am approving this document Date: 2020.10.29 14:10:20 -08'00' Monty M Myers _____________________________________________________________________________________ Updated By: CJD 12/5/2019 Current Schematic Granite Point Field Well: GP 55RD Last Completed:Future PTD: 219-103 API: 50-733-20479-01-00 CASING DETAIL Size Wt Grade Conn ID Top Btm 26” Conductor Surf 306’ 13-3/8” 68 K-55 BTC 12.415 Surf 1,318’ 9-5/8” 53.5 P-110 BTC 8.535 Surf 4,997’ 7” 26 L-80 DWC/C 6.276” 4,796’ 10,395’ (TOW) TUBING DETAIL 2-7/8” 6.4 L-80 IBT 2.441 Surface 492’ JEWELRY DETAIL No Depth (MD)Item 1 10,395’ Whipstock (Not Pictured) PBTD:±10,196’ MD TD:10,756’MD RKB = 132’ 7” 106 bbls pumped below Retainer 13-3/8” 9-5/8” Cmt Retainer – 10,327’ MD 26” TOW –10,395’ 5 bbls pumped on top of Retainer; Est. TOC @ 10,196’ MD PB3 4997' BHA fish with nuclear sources (11044 ft TD) Suspended PB1 PB2 PB3 TD 10,347' MD / 9,130' TVD 10,717' MD / 9,479' TVD 11,044' MD / 9,654' TVD KOP N/A 9,813' MD / 8,634' TVD 10,395' MD / 9,188' TVD TD Date 9/24/2019 10/13/2019 10/25/2019 PTD: 219-103 / API: 50-733-20479-01-00 MPU GP-55RD Sidetrack Summary (time drill 9/30/19) (kick off 10/21/19) Lost BHA 629ft OAL Activity Date Ops Summary 9/13/2019 Prep and move rig f/GP-53RD to GP-55RD.;N/D Dry Hole tree from well head. Install 13-5/8" 5K Hub by 11" 5K Flange adapter spool.;Land riser w/ 11” 5 k X 13- 5/8” 10 k DSA on wellhead adapter spool and M/U bolts on same.;Set BOP on riser and M/U bolts on same. Install bell nipple. Check hub and all flange bolts again after BOP's in place.;Change out Top Drive saver sub, lower IBOP valve and dies in "grabber". Re-sequence hydraulics to break out, had to C/O 2 of 4 sequencing cartridges. C/O swivel pkg. Simultaneously cleaning starb. flow trough.;Clean 5" liner run tools from last well, make ready ship to beach, clean and clear rig floor all unecessary equipment, clean wellhead room, clean trough to shakers, C/O shaker screens to 170s.;P/U 8-3/8 clean out BHA, stand back in mast.;M/U test plug in prep for BOP test. 9/14/2019 R/U and shell test BOPE w/ 3500 psi- Good Test, Checked accumulator bottles pressures and calibrated gas alarm sensors.;Straighten and clean up rig floor while waiting on Brian Bixby w/ AOGCC to arrive to witness initial BOP test.;Test BOPE per Hilcorp, Spartan and AOGCC standards. Test Rams, Valves and Annular to 250 psi low / 3500 psi high f/ 5 min each on chart. Perform function test on Accumulator, PVT and gas detector alarms, manual and both hyd. chokes. No Failures. Witnessed by AOGCC Inspector Brian Bixby.;R/D test equipment and clear rig floor of same.;Install wear bushing .;R/U and M/U 8-3/8" clean out BHA, P/U 3 jt. 5" HWDP and 12 jt. 5" DP. Continue to RIH w/ 5" pipe out of the derrick, tag up at 4875 ft.;PJSM all personnel including GP platform foreman. Topic: Displace wellbore OBM, contingencies and possible hazards.;Commence displace 9-5/8 wellbore to OBM. Total 301 bbls, linear pressures, no stops or re- starts. Fluids balanced DP and annulus.;PJSM, test 9-5/8 csg 2500 psi - 10 min. Test successful, no re-tests.;Drill cmt and float equip 4875 - 5031 ft. Hard, dense cement.;Drill ahead 8-3/8 hole new formation for FIT, 5031 - 5044 ft. 9/15/2019 Drill new hole to 5051' 73RPM, 5.2 TQ, 18 WOB, 272 gpm, 500 psi.;Perform FIT to 13 ppg EMW = 9.1 ppg MW w/ 810 psi. - Good test.;Pump dry job.;POOH for Rotary Steerable Drilling Assembly.;M/U BHA #2, Rotary Steerable w/ OnTrak-MWD as per DD.;Work boat with crane before tide changes. Swap out empty LVT ISO with full one. Load out 2 full cuttings boxes.;Continue M/U BHA #2 as per DD.;RIH w/ BHA #2, picking up 135 jt. 5" DP.;Wash and ream 5006 - 5051 ft. Take no wt, wellbore free.;Downlink MWD, drill ahead 8-3/8 hole RSS OnTrak, 5051 - 5241 ft. WOB 22.5, RPM 112, GPM 460, SPP 1738.;Transported to KGF G&I: Offloaded Solids = 72 Cumulative Solids = 72 9/16/2019 Directional drill 8-3/8" hole w/ RSS OnTrak f/ 5,241' - 5,448' WOB 19-22, RPM 112, TQ 6.5, GPM 504, SPP 1918, ECD 10.3, PU 160, SO 140, ROT 150.;Directional drill 8-3/8" hole w/ RSS OnTrak f/ 5,448' - 5,723' WOB 20-21, RPM 112, TQ 6-7, GPM 502, SPP 1920, ECD 10.2, PU 160, SO 140, ROT 150.;Directional drill 8-3/8" hole w/ RSS OnTrak f/ 5,723' - 5887' WOB 21 - 22, RPM 112, TQ 6-7, GPM 502, SPP 1925, ECD 10.2, PU 160, SO 140, ROT 150.;Directional drill 8-3/8" hole w/ RSS OnTrak f/ 5887' - 6135' WOB 21 - 22, RPM 112, TQ 6-7, GPM 502, SPP 1925, ECD 10.2, PU 160, SO 140, ROT 150.;Transported to KGF G&I: Offloaded Solids = 117 Cumulative Solids = 189 9/17/2019 Directional drill 8-3/8" hole w/ RSS OnTrak f/ 6135' t/6365' WOB 21 - 22, RPM 112, TQ 6-7, GPM 502, SPP 1925, ECD 10.2, PU 160, SO 140, ROT 150.;Directional drill 8-3/8" hole w/ RSS OnTrak f/ 6365' t/6450' WOB 18 - 22, RPM 100 to 115, TQ 6-7, GPM 525, SPP 2200, ECD 10.3, PU 160, SO 140, ROT 150. Canrig equip went down.;Contact Canrig tech and trouble shoot system. Can't get system going. Bring Canrig tech back to rig and he arrived at 1700 hrs. Circ and work pipe while trouble shooting.;Pump dry job and short trip back to shoe while trouble shooting Canrig system. [Got Canrig system running at 1930 hrs.] Wellbore good condition, normal up drag, no swab, gain, loss.;Service rig.;Flow check, PJSM, RIH 5" DP 4940 - 6450 ft. Precaution wash - ream 90 ft to btm. No fill. No gain - loss.;Directional drill 8-3/8" hole w/ RSS OnTrak f/ 6450 - 6718' WOB 15 - 20, RPM 120, TQ 7-8, GPM 558, SPP 2475, ECD 10.5, PU 190, SO 150, ROT 170. Note: Drill at reduced GPM while clean flowline troughs to shakers. 6541 - 6560 ft.;Transported to KGF G&I: Offloaded Solids = 162 Cumulative Solids = 351 9/18/2019 Directional drill 8-3/8" hole w/ RSS OnTrak f/ 6718 - 6920' WOB 15 - 25, RPM 110 - 130, TQ 6.5 - 8, GPM 570, SPP 2550, ECD 10.5, PU 200, SO 160, RT Wt 180. Had issues keeping our ROP up until we raised the bit wt to 25k.;Directional drill 8-3/8" hole w/ RSS OnTrak f/ 6920' t/ 7103', WOB 20 - 25, RPM 120 - 130, TQ 6.5 - 8, GPM 570, SPP 2550, ECD 10.5, PU 200, SO 160, RT Wt 180. Pumped 20 bbl high vis lube sweep at 6943' with no increase in cuttings. Lost a swab on #1 mud pump and had to swap to 2 & 3.;Directional drill 8-3/8" hole w/ RSS OnTrak f/ 7103' t/ 7106', Lost ROP and made numerous attempts to get it back drilling to no avail.;Mix and pump dry job.;PJSM, flow check, POH 5" DP for bit, 7106 to BHA at 581 ft. Wellbore exc condition. Normal drag, no swab - gain - loss.;Handle BHA #2, break and grade bit #2. (1, 1, No, A, X/1, In, No, PR), Download and stand back OnTrak assy. NOTE: While pulling drill collar slips, 3 slip dies came loose from slip bodies and fell down hole.;Decision made to RIH tri-cone mill tooth bit in order to drill up and or push aside junk into formation. Handle BHA #3, (8-3/8 tri-cone assy.). Re-arrange BHA on rack, re-position stabilizer to 30 ft above bit. RIH same. (Bit, bit sub, jt HWDP, stab).;Flow check, follow BHA with 5" DP to 4085 ft at 0600 hrs. n (LAT/LONG): evation (RKB): API #: Well Name: Field: County/State: GPF GP-55RD Granite Point Hilcorp Energy Company Composite Report , Alaska Contractor AFE #: AFE $: Spartan 151 Job Name:1911669D GP-55RD Drilling Spud Date: gp cement.;Drill ahead 8-3/8 hole new formation for FIT, 5031 - 5044 ft. Directional drill 8-3/8" hole w/ RSS OnTrak f/ 6135' t/6365' Prep and move rig f/GP-53RD to GP-55RD. Directional drill 8-3/8" hole w/ RSS OnTrak f/ 5,241' -5,448' R/U and shell test BOPE w/ 3500 psi- Good ;Perform FIT to 13 ppg EMW Directional drill 8-3/8" hole w/ RSS OnTrak f/ 6718 - 6920' pp g p p gp hazards.;Commence displace 9-5/8 wellbore to OBM. Total 301 bbls, linear pressures, 9/19/2019 RIH w/ junk clean out run to 7000'.;Wash to bottom looking for junk. Wash to bottom several times and work pipe off bottom looking for junk. Didn't see any indication of junk on bottom.;Drill 8 3/8 hole f/ 7106' t/ 7190', 455 GPM, 1730 Psi, 105 RPM, 6.5 to 7.5 TQ, 15 to 25 WOB.;Circ hole clean while keeping pipe moving. 100 RPM, 525 GPM, 1945 Psi.;Check flow, Pump dry job, and POH to BHA. Didn't have any issues in open hole and hole fill was good. Had an overpull in the csg at 2750' that could have been a slip dye.;Clean and clear rig floor.;M/U BHA #4, Bit #4 (OnTrak RSS ASSY) L/D jars and replace (Excessive Leaking Through Weep Hole), RIH same.;Flow check, follow BHA with 5" DP (P/U 45 jts in Singles) to 2400 ft.;Shallow test MWD. Test successful.;Service Rig.;Flow check, RIH 5" DP, 2400 - 7000 ft.;Bring pumps on line, down link tools, re-log new 8-3/8 hole 7100 - 7190 ft. NOTE: No junk in hole encountered entire trip in hole. Wellbore exc condition, normal dn drag, no obstruction, no gain - loss. Trip gas 115u.;Drill ahead 8-3/8 hole with OnTrak RSS, 7190 - 7250. WOB 20-25, RPM 125, GPM 550, SPM 160, SPP 2400, Tq 7200. No gain - loss, cuttings normal quantity - quality. BG gas 24u.;Transported to KGF G&I: Offloaded Solids = 136 Cumulative Solids = 487 9/20/2019 Drill 8-3/8" hole with OnTrak RSS, f/ 7250' t/ 7492'. = 40 FPH. WOB 15-22, RPM 110 - 125, GPM 550, SPP 2400, Tq 7500 to 8900, MW 9 ppg, ECD 10.4.;Drill 8-3/8" hole with OnTrak RSS, f/ 7492' t/ 7783'. = 48.5 FPH. WOB 15-24, RPM 105 - 130, GPM 545, SPP 2330, Tq 7500 to 9400, MW 9 ppg, ECD 10.3. [Unload 2 cmt pods and cementers off boat. Offload pods and put them back on the boat.];Re-cip drill string while clean flow line troughs to shakers. Sludge build up, cannot flow OBM without possibility of overflow and spill. Fabricate flow line jet manifold.;Resume Drill 8-3/8" hole with OnTrak RSS, f/ 7783 - 8163'. = 50 FPH. WOB 15-22, RPM 110 - 125, GPM 550, SPP 2400, Tq 7500 to 8900, MW 9 ppg, ECD 10.3 Connectons free, normal drag, no gain - loss, cuttings returns normal quantity - quality. BG Gas 37u.;Transported to KGF G&I: Offloaded Solids = 85 Cumulative Solids = 572 9/21/2019 Directional Drill 8-3/8" hole with OnTrak RSS, f/ 8163' t/ 8373'. = 35.3 FPH. WOB 15-24, RPM 110 - 125, GPM 535, SPP 2365, TQ 7500 to 10,000, MW 9 ppg, ECD 10.3. Backreaming a full std before every connection.;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 8373' t/ 8448'. = 30 FPH. WOB 15-24, RPM 110 - 125, GPM 551, SPP 2485, TQ 7500 to 10,000, MW 9 ppg, ECD 10.4.;Circ bottoms up. Check flow, and pump dry job.;Short trip to 7190'. Pulled 20k over coming through tight spots f/ 7400' t/ 7350'. pulled 10k over pulling through at 7245'. Both spots were coals. Took 10 to 15k going back through 7350' t/ 7400'. Wash last std to bottom and had 2' of fill.;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 8448' t/ 8498'. = 33.3 FPH. WOB 15-24, RPM 110 - 125, GPM 547, SPP 2500, TQ 7500 to 10,000, MW 9.1 ppg, ECD 10.5.;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 8498 - 8930'. = 40 FPH. WOB 15-24, RPM 110 - 125, GPM 550, SPP 2450, TQ 7500 to 10,500, MW 9.1 ppg, ECD 10.1. Connections free, normal drag, no gain - loss, cuttings returns normal quantity - quality. Trip Gas 65, BG Gas 34u.;Transported to KGF G&I: Survey 8795 MD, Inc 13.31, Az 268.78, TVD 7643, VS 3091, .5 ft Low, 5 ft Left Offloaded Solids = 198 Cumulative Solids = 770 9/22/2019 Directional Drill 8-3/8" hole with OnTrak RSS, f/ 8930' t/ 9088'. = 26.3 FPH. WOB 15-24, RPM 110 - 125, GPM 544, SPP 2490, TQ 8500 to 11,100, MW 9.1 ppg, ECD 10.2. [ 45 hrs & 325 Krevs on bit at noon.].;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9088' t/ 9245'. = 26 FPH. WOB 15-24, RPM 98 - 125, GPM 544, SPP 2490, TQ 8,500 to 12,200, MW 9.1 ppg, ECD 10.2. [When we hit a hard spot we back off on the flow rate until the torque starts to increase].;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9245 - 9390'. = 25 FPH. WOB 15-24, RPM 98 - 125, GPM 508, SPP 2290, TQ 8,500 to 12,200, MW 9.1 ppg, ECD 10.2.;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9390 - 9550'. = 25 FPH. WOB 15-20, RPM 95 - 125, GPM 508, SPP 2290, TQ 8,500 to 12,200, MW 9.1 ppg, ECD 10.2.;Hole Position at last survey = 0.45' Low / 3.56' Right Transported to KGF G&I: Offloaded Solids = 153 Cumulative Solids = 923 9/23/2019 Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9550' t/ 9692'. = 23.6 FPH. WOB 15-25, RPM 95 - 125, GPM 502, SPP 2270, TQ 9,000 to 13,000, MW 9 ppg, ECD 10.1.;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9692' t/ 9816'. = 20.6 FPH. WOB 10-25, RPM 95 - 125, GPM 485, SPP 2150, TQ 9,000 to 13,100, MW 9 ppg, ECD 10.1. [70 hrs & 500 Krevs at 1800 hrs.] Started bringing on 7" csg at 1530 hrs.;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9816 - 9962'. = 25 FPH. WOB 10-25, RPM 95 - 125, GPM 495, SPP 2185, TQ 9,000 to 13,100, MW 9.1 ppg, ECD 10.1.;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9962 - 10,078'. = 25 FPH. WOB 10-25, RPM 95 - 125, GPM 495, SPP 2185, TQ 9,000 to 13,100, MW 9.1 ppg, ECD 10.1. Connections free, normal drag, no gain - loss, cuttings returns normal quantity - quality. Conn Gas 60, BG Gas 20u.;Hole Position at last survey = 5.65' Above / 3.38' Left Transported to KGF G&I: Offloaded Solids = 144 Cumulative Solids = 1167 9/24/2019 Directional Drill 8-3/8" hole with OnTrak RSS, f/ 10,078' t/ 10,221'. = 23.8 FPH. WOB 10-25, RPM 95 - 125, GPM 502, SPP 2293, TQ 9,500 to 14,100, MW 9 ppg, ECD 10. Pumped high wt high vis sweep at 10,150'. Sweep came back on time w/ a 15% increase in fines.;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 10,221' t/ 10,292'. = 11.8 FPH. WOB 10-25, RPM 95 - 125, GPM 502, SPP 2293, TQ 9,500 to 14,100, MW 9 ppg, ECD 10.1. Got into the C5 sand and ROP slowed way dn.;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 10,292' t/ 10,340'. = 10.7 FPH. WOB 10-25, RPM 95 - 125, GPM 502, SPP 2157 psi, TQ 9,500 to 14,100, MW 9 ppg, ECD 10.1. Backream full std.;Pumped high wt high vis lube sweep at 10,333'. No cuttings increase w/ sweep back at shakers. AOGCC given 48 hrs notice of upcoming BOP test on 09-27-2019 1:00 AM.;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 10,340' t/ 10,341'. = 1 FPH. WOB 10-25, RPM 95 - 125, GPM 502, SPP 2157 psi, TQ 9,500 to 14,100, MW 9 ppg, ECD 10.1. Torqued up to 16K & lost all returns.;Racked back one stand. Picked up 50' above bottom. Recip pipe. Began filling backside w/ seawater, while building 35 bbl @ 45 ppb LCM pill. (Baracarb, steel seal) Pumped pill slowly out bit w/ no returns. (Building second pill simultaneously.) Backside filled ~150 bbls SW.;Backside filled when LCM pill was outside bit. Chasing w/ 2nd pill. Slight returns. Tried 5 rpms w/ 16K TQ. Stopped rotary. PU one more stand to 10,205'. Finish spot second pill outside bit. Call town to discuss plan forward. Downhole Losses 516 bbls MOBM, 628 bbls SW.;Work & reciprocate & rotate DP f/ 10,205' t/ 10,341'. Stage pumps each stand monitoring returns. Break out & set back 2 jts from last stand in mousehole. Stage pumps to 300 gpms w/ full returns.;Drill 8-3/8" hole with OnTrak RSS, f/ 10,341' t/ 10,347'. = 6 FPH. WOB 1 K, RPM 66, GPM 301, SPP 1748 psi, TQ 6900K, MW 8.7 ppg, Full returns. Pump 35 bbl LCM pill & spot outside bit.;POOH f/ 10,347' t/ 10,163' while circulating good MOBM to surface. PU 323 K, RPM 2, GPM 211, SPP 363 psi, TQ 5900K, MW 8.5 ppg, Full returns.;Transported to KGF G&I: Offloaded Solids = 108 Cumulative Solids = 1275 Directional Drill 8-3/8" hole with OnTrak RSS, f/ 8930' t/ 9088'. = 26.3 FPH. WOB 15-24, RPM 110 - 125, GPM 544, SPP 2490, TQ 8500 to 11,100, MW 9.1 gp p g ;Drill 8-3/8" hole with OnTrak RSS, f/ 10,341' t/ 10,347' drillled to 10347 ft Torqued up to 16K & lost all returns. Drill 8-3/8" hole with OnTrak RSS, f/ 7250' t/ 7492' Directional Drill 8-3/8" hole with OnTrak RSS, f/ 10,078' t/ 10,221'. = . Got into the C5 sand and ROP slowed way dn.;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 10,292' t/ 10,340'. Directional Drill 8-3/8" hole with OnTrak RSS, f/ 8163' t/ 8373'. 9/25/2019 Work pipe f/ 10,121' t/ 10,208' pumping saltwater at 175 GPM & 300 Psi, While getting OBM treated and ready for displacement. Lost 30' of hole due to water reacting to formation while working pipe.;Displace well to OBM taking saltwater back and shipping it to production at 4 BPM. Pumped 464 bbls of the seawater returns to production then took the rest of the returns back to mud pit slop tank.;With hole full of OBM brought circ rate up to 290 GPM, 1350 psi and started reaming f/ 10,155'. to 10,180'. Having pack off issues so we slowed the pump rate dn to 177 GPM, 905 Psi, 80 RPM. Ream to 10,185' while mud getting warmed up and sheared.;Work pumps up to drilling rate of 480 GPM, w/ 2275 Psi, 90 RPM, 15-16K TQ. Down link baker tools to confirm blades are retracted. Circ & Cond MOBM. Adding LVT to active system. (LVT @ bit 19:00 hrs) Balancing MW in & out to 8.7 ppg. Wash & ream t/ 10,187'.;Begin losing MOBM to hole. Slow pumps to 400 gpm. 1521 PSI, 92 RPM. 15-16K TQ. Continue losing to mud hole. Reduce flow to 300 GPM, 1100 PSI, 80 RPM. Continue losing mud to hole. Reduce pumps to 200 GPM, 550 PSI. No losses.;Staged pump rate to 405 GPM, 1800 PSI, 90 RPM. Wash & ream t/ 10,187'. Packing off & inducing losses. Flow out f/ 36% t/ 26%. Pumped 55 bbl hi vis LCM pill. Reduced pump rate to 200 GPM, 650 PSI. Losses slowed but continued. 24 hr losses to hole = 126 bbls.;Mix & pump 55 bbl hi vis LCM pill. Spot outside bit @ 10,180'.;Check flow. Well static. POOH f/ 10,180' t/ 6,600'. Pulled 20K over @10,041'. Not getting correct hole fill. (2 out of 4 bbls per 5 stds) Well static.;Circulate B/U @ 6600'. Stage pumps f/ 205 GPM, 475 PSI. No losses. 300 GPM, 775 PSI. No losses. 421 GPM, 1400 PSI. No losses. Max Gas 110 units.;Check flow. Well static. POOH f/ 6600' t/ 4912', inside csg shoe. Slick TOH.;Clean & clear rig floor after TOH. Prep to slip & cut drill line.;Transported to KGF G&I: Offloaded Solids = 72 Cumulative Solids = 1347 9/26/2019 Finish cleaning floor and prepping to cut drilling line.;Cut and slip drilling line. Service rig.;Flowing back over DP so mix and pump dry job.;POH to BHA. Stand back HWDP . Monitor well.;Work BHA. Stand back flex collars w/ stab. LD filter sub, and float sub. PU and break bit. Bit was a 1-1-I. [Pictures in o-drive], Down load MWD. tools were plugged so we layed everything dn. [Tested gas alarms].;Drain stack, pull wear ring, and set test plug. MU test jt. Well start to flow and built up to a 2" stream. Shut ann valve and pull test plug. Fill stack within 1" from top of the riser and monitor well. after 15 min well started flowing over riser. LD test jt.;PU & MU Cleanout BHA #5 w/ stand of flex collars w/ stab, float sub, and bit. RIH w/ HWDP. Cont RIH t/ 2047'. Not getting proper returns. Slight losses static. Fill pipe. Continue RIH @ <100 fpm to 4978'. Slight static losses.;Stage pumps - 100 GPM / 151 PSI, 200 GPM / 318 PSI, 300 GPM / 556 PSI, 400 GPM / 1027 PSI. Full returns, No losses. Running degasser. Max Gas 444 units. MW in 8.8 ppg. MW out 8.7 ppg. Ditch 8.6 ppg. Circ surf to surf. Stop pumps. Monitor well. Hole static.;Weight up active system @ 4968' to 8.9 ppg MW in & out. 200 GPM / 321 PSI, 280 GPM / 595 PSI, 407 GPM / 1114 PSI . Max gas 47 units. Adding backround LCM during circulation. No losses while pumping.;Monitor well. Flowing pencil thin but steady stream . Build & pump 50 bbl slug w/ 11.9 ppg MW. Prep to POH 10 stds to monitor well.;Transported to KGF G&I: Offloaded Solids = 36 Cumulative Solids = 1383 9/27/2019 Pull 10 stds to about 4000' so we can monitor well for flow after spotting 50 bbl 11.9 slug.;Monitor well for flow. Well stayed static for about 15 min. Then we had had a slow seepage the kept increasing to a stronger flow. Discussed options with town and decided RIH and condition mud then c lean out fill.;RIH 10,105' filling pipe every 2500'.;MU TD and break circ. Start out at 200 GPM and 650 psi. Work pipe dn to 10,130' then back up to 10,105' getting everything moving good. Increase flow rate to 300 GPM 1200 psi. work pipe dn to 10,143' where it started taking wt. PU and start reaming slow f/ 10,138' t/ 10,190'.;At 10,190' the pressure started falling off and then the flow fell off. Next the pipe torqued up and stalled. Shut the pump dn and backed the trapped torque out. PU to 360k with no movement the back dn to 200k with no movement. Fluid fell 6' down in ann and stopped there.;PU to 275k, Set rotary torque limiter at 22k. Kicked rotary in and dropped pipe dn to 250k where it broke loose rotating at 20k. Kept it rotating and inched it up backreaming with no circ or pump up to 10,175'. Then we inched it back down to 10,176'. Shut dn rotary and pulled up to 375k.;Didn't break loose. Slacked back off to 200k and it looked like we had slight movement. PU to 390k and pipe pulled free. Pulled pipe up to 10,105' but we still didn't have circ. Slack off to 10,150'. PU pipe at a high rate and run the pump up to 70 spm. Shut pump dn when pipe got back to 10,105'.;Slack back off with no pump and stroke back up with the pump several times and finally regained full circ. Total 18 bbls downhole losses.;Circ gas out and get mud all evened out at 9.1 ppg [High gas 770 units].;Shut dn and monitor well. Looks like gas is still breaking out so we resumed circ.;Monitor well and it had a very slight flow. We believe the well is breathing. Pull 10 stds and the first 4 stds pulled dry.;Monitor well- Static. Pump dry job. POH. Rack back & LD BHA #5 per Baker. Monitor well - Static. Check Saver Sub - Good.;Clean & Clear rig floor. Prep to test BOPs. Drain stack. M/U test joint, set test plug and R/U to test BOPE. Very slight but steady trickle at wellhead annular valve into bucket. (1 gal / hr) Line up annular valve to Trip Tank for head pressure & monitor well for flow during testing.;Begin testing BOPE as per AOGCC and Hilcorp requirements. AOGCC witness of BOP test waived by State Inspector Mr. Jim Regg 9/25/19 @ 08:03 am. Rams and valves tested 250 psi low / 3500 psi high. Annular tested 250 psi low / 2500 psi high w/ 4" and 5" test joints. Tests charted and held for 5 min ea.;Transported to KGF G&I: Offloaded Solids = 18 Cumulative Solids = 1401 9/28/2019 Finish testing everything on 5". Swap test jts to 4". Test annular, upper pipe rams, IBOP, and floor valve. All test passed. Witness of test was waived by Jim Regg.;RD test equip. and clean floor.;Unload tbg and equip off the boat and get the floor ready for tbg equip. Got centrifuge rigged up taking mud from ISO, cutting wt back, and putting the mud back into the rig pits.;Get tbg tongs on the rig floor. Get everything ready to PU tbg.;PU defuser and 30 jts of 3 1/2, 9.2 lb tbg. MU XOs and 1 std of 5" DP.;RD tbg tongs and RU Hawkjaw. RIH w/ 5" DP t/ 5000'.;Circulate BU. Stage pumps to 300 GPM / 545 PSI. No losses. Max Gas 155 units. Running centrifuge while circulating. 9.05 ppg MW in & 8.9 ppg MW out.;Continue RIH on 5" DP f/ 5000' t/ 10,107'.;Circulate BU. Stage pumps to 300 GPM / 881 PSI. No losses. Max Gas 260 units. Running centrifuge while circulating. 9.05 ppg MW in & 9.15 ppg MW out.;RIH & wash t/ 10,164'. Stacking weight. PU to 10,162'. Good hole. RU for cement job. SLB prepping mix water. Moving computer set up due to rain.;Finish R/U Schlumberger. Hold PJSM. Schlumberger pumped 10 bbls sea water, test lines to 2500 psi, Pump 15 bbls 12.5 ppg mudpush w/ rig. SLB Batch up and pump 34 bbls 15.8 ppg cmt. Centrifuged ISO tank used whole mud to active pits.;Swap to rig and pump 5 bbls 12.0 ppg mudpush, and displace with 144 bbls 9.05 ppg OBM.;RD Cement circulating valves & hose. POOH 8 stds @ ~30 fpm f/ 10,162' to 9347'. Cmt in place at 05:30 hrs w/ a final pressure of 200 PSI @ 160 GPM.;Drop foam ball. Begin circulate out cement stinger & cleaning up hole. 381 GPM, 1327 PSI.;Transported to KGF G&I: Offloaded Solids = 36 Cumulative Solids = 1437 9/29/2019 Continue cir bottoms up to clear pipe of cmt. Did see traces of the cmt spacer on bottoms up. Pump dry job.;PU and break dn cmt head. Clear tools off floor.;POH to tbg.;RD DP equip & RU tbg equp. LD 8 jts 3 1/2 tbg. Secure well so hands could help with deck water management.;Rain was building up on the decks and we were not able to keep up with just the rstbs. Got all the hands working on pumping the decks so we didn't cause a spill to the inlet due to heavy and constant rain. Finally got everything caught up.;Continue POH LD 3 1/2 tbg cmt stinger and defuser. Wash out defuser and send to the welder for clean out.;RD tbg equip, clean floor, and RU to PU drilling BHA.;Service rig, Grease up TD, Blocks, Crown, and drwks. Prep to PU BHA #6.;PU & MU Kick Off BHA #6 w/ 1.5° bend Motor & OnTrak MWD. (C/O inserts f/ 1.3° t/ 1.5°) Scribe Motor. MU 8 3/8" Kymera bit. Upload MWD. MU Jars & HWDP.;RIH w/ Kick Off BHA #6 w/ 1.5° bend Motor & OnTrak MWD on 5" DP t/ 5242'. Fill pipe per ~25 stds.;Test MWD. - Good test. Circulate BU. 451 GPM, 1811 PSI. 9.05 ppg MW in, 9.0 ppg MW out.;RIH w/ Kick Off BHA #6 w/ 1.5° bend Motor & OnTrak MWD on 5" DP f/ 5242' t/ 8626'. Fill pipe per ~25 stds.;Transported to KGF G&I: Offloaded Solids = 36 Cumulative Solids = 1473 pyj p M/U test joint, set test plug and R/U to test BOPE. Ver g g g ppg ppg g hole. RU for cement job. SLB prepping mix water. Moving computer set up due to rain.;Finish R/U Schlumberger. Hold PJSM. gjpppggppg Schlumberger pumped 10 bbls sea water, test lines to 2500 psi, Pump 15 bbls 12.5 ppg mudpush w/ rig. SLB Batch up and pump 34 bbls 15.8 ppg cmt.gp p p p ppg p g p p p ppg Centrifuged ISO tank used whole mud to active pits.;Swap to rig and pump 5 bbls 12.0 ppg mudpush, and displace with 144 bbls 9.05 ppg OBM.;RD Cementgppgp circulating valves & hose. POOH 8 stds @ ~30 fpm f/ 10,162' to 9347' g g Continue losing mud to hole. pp gp Reduce pumps to 200 GPM, 550 PSI. No losse gg p pq Rams and valves tested 250 psi low / 3500 psi high. Annular tested 250 psi low / 2500 psi high w/ yp 4" and 5" test joints. y decided RIH and condition mud then clean out fill.;RIH 10,105' filling pg pipe every 2500'.;MU 34 bbl cmt plug 10160 ft HWDP.;RIH w/ Kick Off BHA #6() yp w/ 1.5° bend Motor & OnTrak MWD on 5" DP t/ 5242'. Fill pipe per ~25 stds.;Test MWD. - Good test. Circulate BU. 451 GPM, 1811 PSI. 9.05 ppg MW in, 9.0 pp p ppg MW out.;RIH w/ Kick Off BHA #6 w/ 1.5° bend Motor & OnTrak MWD on 5" DP f/ 5242' t/ 8626'. Fill pipe per ~25 stds. gp p POOH f/ 6600' t/ 4912', inside csg shoe. [] jt. Well start to flow andpgg y y g [ g ] p g pg j built up to a 2" stream. Shut ann valve and pull test plug. Fill stack within 1" from top of the riser and monitor well. after 15 min well started flowing over riser. POOH f/ 10,180' t/ 6,600' 9/30/2019 Fill pipe at 5242' and continue RIH to 9225'.;Wash dn to 9570' and started running into stringers. Started washing and reaming at 9617' where it was holding more wt. Cleaned out soft cmt dn to 9813' where it held 10k while rotating and pumping 300 GPM at 1430 psi. Hard cmt at 9813'.;Orientate motor and started troughing f/ 9788' t/ 9812'.;Time drilling at 1'/hr f/ 9,812' t/ 9,816'. Getting back 95% cmt and 5% siltstone and coal. Pumping 516 GPM, 2700 Psi. MW 9.1 ppg, ECD 10.1 ppg.;Time drilling at 1'/hr f/ 9,816' t/ 9,818'. Getting back 94% cmt and 6% siltstone and coal. Pumping 517 GPM, 2700 Psi. MW 9 ppg ECD 10.1 ppg.;Time drilling at 1'/hr f/ 9,818' t/ 9,822'. 94% cmt and 6% siltstone and coal. Pumping 517 GPM, 2700 Psi. MW in 9.0 ppg / out 9.0 ppg. ECD 10.0 ppg.;Time drilling at 2'/hr f/ 9,822' t/ 9,830'. 70% cmt and 30% siltstone / sandstone. Pumping 523 GPM, 2709 Psi. MW in 9.0 ppg / out 8.9 ppg. ECD 10.0 ppg.;Time drilling at 3'/hr f/ 9,830' t/ 9,838'. 40% cmt and 60% siltstone , sandstone & coal. Pumping 527 GPM, 2737 Psi. MW 9.0 ppg in & out. ECD 10.1 ppg.;Time drilling at 4'/hr f/ 9,838' t/ 9,841'. 10% cmt and 90% siltstone , sandstone & coal. Pumping 527 GPM, 2737 Psi. MW 9.0 ppg in & out. ECD 10.1 ppg.;Transported to KGF G&I: Offloaded Solids = 54 Cumulative Solids = 1527 10/1/2019 Time drill at 10' / hr f/9,841' t/ 9,860' Getting back 90% formation and 10 % cmt. 530 GPM, 2770 Psi.;Time drill at 20' / hr f/9,860' t/ 9,870'. Take check shot survey.;Directional drilling f/ 9,870' t/ 9,913'. 520 GPM, 2720 Psi, 40 RPM, 12k TQ.;Directional drilling f/ 9,913' t/ 10,055'. 520 GPM, 2720 Psi, 40 RPM, 12k TQ. Separation projected at the bit at 10,055' = 30' (Rot= 2.3 hr, Sld=3.3 hr).;Drilling / Slliding 6 1/8" hole f/ 10,055' t/ 10,120'. 26.7 FPH ROP, 285K PU, 200K SO, 240K RT, 15- 25K WOB, 525GPM, 2971 PSI, MW 9.0 ppg, 10.0 ppg ECD, 0 RPM, 6-7K TQ. Take SPRs.;Drilling / Rotating 6 1/8" hole f/ 10,120' t/ 10,135'. 30 FPH ROP, 285K PU, 200K SO, 240K RT, 15- 25K WOB, 525GPM, 2971 PSI, MW 9.0 ppg, 10.0 ppg ECD, 43 RPM, 6-7K TQ. Take survey.;Drilling / Slliding 6 1/8" hole f/ 10,135' t/ 10,174'. 9.75 FPH ROP, 285K PU, 200K SO, 240K RT, 15- 25K WOB, 525GPM, 2971 PSI, MW 9.0 ppg, 10.0 ppg ECD, 0 RPM, 7-8K TQ. 3.5' Low / 12.20' Right of Plan.;Sliding @ 10,174' MD, 8982' TVD. Torqued up, stalled out, & lost all returns. Stopped pumps. PU 1 full std off bottom to 10,051'. (325K PU). Filled annulus w/ MOBM. (20 bbls to fill) Monitor hole. Static. Pump @ 1.5 bpm. Establish loss rate of 12 bph.;Pump 25 bbl / 40 ppb LCM pill into drill string. (Lost 18 bbls to hole).;TIH f/ 10,051' t/ 10,164'. Finish pump pill outside bit. Work pipe while allowing pill to set.;Pump 2nd 25 bbl / 40 ppb LCM pill to bit.;PU Single. RIH t/ 10,170'. Stage pumps to 400 gpm w/ 40 RPM. No losses. Wash t/ 10,174'. Tag bottom. Immediately lost returns. Stop pumps. PU t/ 10,130'. Monitor well. Static. Call town to discuss plan forward.;POH f/ 10,130' t/ 9704'. Monitor well on trip tank. Allow LCM pill to set.;Transported to KGF G&I: Offloaded Solids = 54 Cumulative Solids = 1527 Daily Metal from Magnets 0 lbs. Total 17.25 lbs. Daily Losses to hole. 42 bbls 10/2/2019 Monitor well on trip tank w/ bit at 9,704'. Allow LCM pill to set. Hole static.;Pump and spot a 50 bbl LCM pill at bit. at 90 gpm.;RIH to 10,176'.;Drill f/ 10,174' to 10,194', 31 FPH ROP, 285K PU, 210K SO, 240K RT, 8-12K WOB, 311 GPM, 1290 PSI, MW 9.0 ppg, 55 RPM, 13.5-14.5K TQ. Initially had 31% returns that we completely lost once LCM pill was up hole and slowly came back to 23%. Lost 195 bbl MOBM.;POOH 90' t/ 10,105' and circulate across top of hole w/ hole fill while monitoring well . Discuss options with town while mixing 2nd 50 bbl 40 ppb LCM pill.;Spot 2nd 40 ppb LCM pill @ bit an drill f/ 10,194 to 10,201' 23 FPH ROP, 285K PU, 210K SO, 240K RT, 11-13K WOB, 270 GPM, 1200 PSI, MW 9.0 ppg, 55 RPM, 13.5K TQ. Maintained 23% returns while drilling. Lost 120 bbl MOBM and shut down to build volume.;POOH to 10,090' fill backside with diesel, circulate diesel across top of hole and monitor while building volume. Rate of loss to hole ~30 bbl/hr. Discuss current conditions with town and discuss plan forward options.;Continue to circ diesel across top of hole while building volume with LVT and diesel. Make arrangements to use the vessel Red Dog to transport 3 ISO's of MOBM from the beach and to purchase 813 bbl of MOBM from Glacier Oil and Gas. Loss rate declining f/ 12 bph to 0 bph.;Pump MOBM out of shaker pits 1,2 &3 (106 bbl) and bypass same while continuing to build volume with diesel and wt up to 8.8 ppg. Circulating diesel across top of hole . Loss rate @ 0 bph . Offload mud pallets from M/V Red Dog. CO shaker screens to 80s.;Offload 3 ISOs 9.6 ppg MOBM from Glacier O&G + 1 ISO LVT. Build additional 8.75 ppg MOBM volume. Stage products & Build 100 bbl LCM pill in Slug pit 2. Add 55 bbls diesel to Slug pit 1.;Stage pumps to 1.5 bpm to confirm flow. Pump LCM pill chain to bit - 5 bbls slop water from pit 1, 35 bbls pill from Slug pit 2, 5 bbls slop water from pit 1, 35 bbls diesel flush from Slug pit 1, remaining pill from slug Pit 2. Begin chase w/ MOBM w/ 750 stks.;Transported to KGF G&I: Offloaded Solids = Cumulative Solids = 1527 Daily Metal from Magnets 0 lbs. Total 17.25 lbs. Daily Losses to hole. 128 bbls (Thru midnight) 10/3/2019 Continue to displace LCM pill chain to bit.;RIH f/ 10,090' to bottom @ 10,201'.;Break circulation. (Had a bit of trouble getting IBOP valve to open TD) Stage rate up to 275 gpm.;Drill 8-3/8" hole f/10,201' to 10,264', 29 FPH, ROP, 300K PU, 220K SO, 260K RT, 18-20K WOB, 275 GPM, 1200 PSI, 259 psi Diff, MW 8.9 ppg, 43 RPM, 13.5-14.5K TQ. Initial returns of 27% up to 31% and then down to 21%. Fluid loss rate of 84-97 bph.;Spot 10 bbl 40ppb LCM pill on back side of pipe, P/U to 10,105'. Circulate at 90 gpm and monitor well. Zero losses observed. Attempted to pump up survey but was not able to get pulse from MWD tool (suspect turbine or instruments plugged with LCM).;Drill 8-3/8" hole f/10,264' to 10,359', 57 FPH ROP, 300K PU, 220K SO, 260K RT, 16K WOB, 272 GPM, 1200 PSI, 255 psi Diff, MW 8.9 ppg, 47 RPM, 13.5-14.5K TQ. Returns 22-27% Fluid loss rate of 42 down to 24 bph. (Pumped 5 bbl 40 ppb LCM pills every 10 ' of new hole).;Spot 10 bbl 40 ppb LCM pill on back side of pipe.;POOH to 10,078' and Kelly up.;Stage pumps up to 450 gpm to clean out MWD tool. Survey @ 10,024.59' inst. depth = Inc 15.25°, Az 260.66°.;RIH to 10,352' (had 7' of fill). Wash and ream to bottom @ 10,359'. Took Survey @ 10,216.33'' inst depth = 21.41° Inc., 243.54° Az. and Survey on bottom @ 10,310.03'' inst depth = 21.87° Inc., 243.85° Az.;Drill 8-3/8" hole f/10,359' t/ 10,394', 70 FPH ROP, 300K PU, 220K SO, 260K RT, 20-35K WOB, 272 GPM, 1145 PSI, 268 psi Diff, MW 9 ppg, 45 RPM, 14.5K TQ. Returns 24%.;Orient tool face and Slide Drill f/10,394' to 10,408' , 8 FPH ROP, 300K PU, 220K SO, 260K RT, 35K WOB, 347 GPM, 1490 PSI, 185 psi Diff, MW 8.9 ppg,.145 rpm @ Bit. Returns 26% , Fluid losses ~40 bph. Difficulty holding tool face. Getting low on MOBM volumes. Call town & discuss plan forward.;Rotate & reciprocate drill string while building 70 bbl LCM pill. 310K PU, 220K SO, 260K RT, 250 GPM, 577 PSI, 185 psi Diff, MW 8.8 ppg,.140 rpm @ Bit. Returns 26%. Fluid losses ~40 bph. Pump 70 bbl LCM lube pill & spot in annulus. (1027' pill length).;POH f/ 10,408' - 9,193' above LCM / lube pill. 310K PU. Hole slick. Monitor hole. Slight static losses.;Stage pumps to 2 bpm. 123 PSI. No losses while circulating. MW in & out = 8.8 ppg. Add LCM to active system while circulating. Fill trip tank. Stop pumps. Monitor hole. No static losses.;Pump 20 bbl slug. POOH f/9,193' t/ 4,946'. Check hole inside csg shoe. No static losses. 40 fpm running speed. Hole slick. Continue POOH f/4,946' t/ 3673'.;Transported to KGF G&I: Offloaded Solids = 54 Cumulative Solids = 1581 Daily Metal from Magnets 0 lbs. Total 17.25 lbs. Daily Losses to hole. 559 bbls l at 10' / hr f/9,841' t/ 9,860' Getting back 90% formation g g Hard cmt at 9813'.;O Start time drill PB2 10/4/2019 Continue POOH w/ BHA #6 to 916'.;MOBM from hole fill leaked onto deck of GPP due to wind breaking trap anchor strap allowing tarp to catch on valve handle and open same. Suspend tripping and secure well. All crews engaged in cleanup of spill. Total spilled ~32 gallons. Cleaned beam s and decking on rig as well as top deck of GPP.;Resume TOH to BHA. Laied down jars.;POH stand back Compressive Drill Pipe and L/D remaining components of BHA #6. (Had to take extra precautions laying down tools from rig floor to deck due to 50 mph winds).;Clean and clear rig floor.;P/U BHA #7. Bit, ATK Steerable Stab, Flex sub w/ S\tab, OnTrak-MWD, MWD-Stab-Mod, BCPM, NM MWD-Sub-Stop.;Upload MWD.;Finish MU BHA, compressive DP, Jars & HWDP. RIH on 5" DP t/ 761'.;Shallow pulse test MWD @ 761'. 450 GPM, 901 PSI. Good test.;RIH on 5" DP f/ 761' t/ 4,924'. Fill pipe per 25 stds. Monitor well. Static.;While waiting on boat with mud products circulate @ 4,924'. 2 BPM, 111 PSI. No losses. Maintain 8.8 ppg MW in active mud system. Check well 04:00. Static. Replace tarp containment across water from Rig to GPP due to wind damage.;Build additional 158 bbls MOBM in pit #2 w/ 80 bbls diesel, 60 bbls oily water, and premix f/ Slug pit #1. Waiting on boats w/ additional ISOs LVT & 9.6 ppg MOBM from Glacier.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1581 Daily Metal from Magnets 0 lbs. Total 17.25 lbs. Daily Losses to hole. 559 bbls 10/5/2019 Circulate and monitor well @ 4,924'. 2 BPM, 111 PSI. (No losses) While waiting on boat with mud products.;RIH f/ 4924' to 10,241'. Filled pipe at 7115' and 9579' with no losses.;Wash and ream f/10,241' tagging bottom @ 10,400' (8' high) . 1282 psi @ 367 gpm. 116 rpm, 14.6K TQ. Initially saw losses of ~180 bbl/hr that dropped to 60-70 bbl/hr closer to bottom (lower ECD due to stabilizers being below loss zone).;Directional drill 8-3/8" hole f/ 10,400' to 10,415'. 24 ft/hr ROP, 25K WOB, 139 rpm, 16K TQ, 1341 psi, 391 gpm, 29% Returns, 9.5 ppg ECD. PUW= 300, SOW=220, Rot=250 . Loss rate ~ 60 bbl/hr.;Directional drill 8- 3/8" hole f/ 10,415' to 10,,512'. 23 ft/hr ROP, 25K WOB, 124 rpm, 16.7K TQ, 1468 psi, 403 gpm, 29% Returns, 9.5 ppg ECD. PUW= 310, SOW=220, Rot=250. Loss Rate 40 bbl/hr (384 bbl total losses today). SPR @ 20, 30 & 40 spm : #1 MP 150, 200, 250 psi / #2 MP 125, 175, 250 psi.;Mix 45 bbl LCM pill and lay on bottom of hole. Monitor well (Static).;POOH 10 std to 9579'. 40K over pull @ 10,414', ran back through it and pulled clean 2nd time through. 10-15 over pull @ 10,171'.;Monitor well (Static) Circulate @ 2 bpm, 137 PSI, 310 PU, 220 SO, 250 RT. Waiting on 3 ea. ISO's of MOBM from the Osprey Platform. Losing ~8 bph. Slow pumps t/ 1 bpm. Continue losing ~8 - 10 bph. Build & pump 33 bbl LCM pill to backside.;Monitor well. Hole took 12 bbls to fill backside. POH 6 stds above LCM pill f/ 9579' t/ 9,051'. Hole slick.;Circulate @ 1 bpm, 117 PSI w/ LCM pill dropping to loss zone. Losses to hole ~6 bph down to 0 bph. M/V Titan on site 01:50 am. (Next, heading back to Ospry for additional MOBM.) Offload 3 x ISO tanks 9.6 ppg MOBM to mud pits. Blend 110 bbls LVT, 248 bbls MOBM. 150 bbls oily water.;Stop pumps. Reciprocate pipe. Equalize, circulate & agitate pits 2 & 3 for total 537 bbls 8.8 ppg mud on surface. Continue circulate @ 1 bpm. 120 PSI. Begin building 70 bbl LCM pill in Slug pit.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1581 Daily Metal from Magnets 0 lbs. Total 17.25 lbs. Daily Losses to hole. 328 bbls 10/6/2019 Circulate @ 9,051' 1 bpm. 120 PSI. Build 70 bbl LCM pill in Slug pit 2. Pump and spot 10 bbl. of LCM pill in HWDP.;RIH to 10,430'.;Wash and ream to bottom @ 10,505' (Tight hole f/ 10,494' to bottom) Broke circulation slowly working up f/40 gpm to 390 gpm w/ 1800 psi. (Loss rate of ~ 60 bbl/hr).;Cycle pumps to turn on MWD w/o success. Attempt to surge tool and pump at max rate to open tool with no success. Baker tech services recommended weighted sweep.;POOH 15 std to 9,106' while mixing weighted sweep.;Pump weighted sweep down to above tool @ 89 gpm to min losses. At tool increase rate to 600 gpm to create turb. flow to open and clear tool. No Go . Try surging without luck . Monitor well - loss rate 20 bbl/hr Static. Offloading 3 ISO's of MOBM from Osprey Platform.;Call town and discuss options and determine plan forward. Pump out 2 x ISO's of 9.6 ppg MOBM into pit #2 and load ISO's back onto boat. Blending water and diesel in with MOBM in pit #2 to get to 8.8 ppg. (Total losses last 12 hours = 267 bbl) Total MOBM on surface 598 bbls 8.8 ppg MW.;Also one remaining ISO of 9.6 ppg MOBM starting into pit 2 to build an additional ~150 bbls of 8.8 ppg MW.;RIH f/ 9,105' t/ 9,855' @ ~60 fpm. Stack up hard w/ 30 K. (~15' coal seam).;Wash & ream f/ 9,855' t/ 9890'. Stage pumps to 2 bpm. 180 PSI, w/ 40 RPM. Went smoothly through coal seam w/ no losses.;PU & set in slips. Elevators hung on box upset. Hammer off elevs. Found 1.5" gash in upset & 1/2" piece of metal w/ teeth wedged between elevs & DP. LD bad joint in mousehole. Appears to be metal f/ Hawkjaws "adjustment nut".;Remove elevators off rig floor to grind bad spot . PU & MU another set of elevators.;Circulate @ 9891' w/ 1 bpm, 117 psi and reciprocate pipe while removing hawkjaws f/ rig floor to repair. RU rig spinner hawks. Prep to continue RIH w/ spinner hawks. Continue building mud in pit 2.;RIH f/ 9,855' t/ 10,453' @ ~60 fpm. PU & work through tight spot @ 10,230'.;Circulate @ 10,461' w/ 1 bpm, 121 psi. Pump 20 bbl LCM pill into drill string. Chase w/ 35 bbls MOBM. Pump 20 bbl diesel pill into string. No losses.;Wash dn f/ 10,461' to btm staging pumps & rotary to drilling rate. 80 gpm t/ 415 gpm, 1825 psi, 30 % flow, 40 -100 RPM. 15-17K TQ, 15 bbls loss. 2' fill off btm.;Drill ahead f/ 10,512' t/ 10,615'. 415 gpm, 22.9 fph. 1837 psi, 30% flow, 120 RPM, 25K WOB, 17 -20K TQ. (Loss rate of ~ 46 BPH down t/ ~30 BPH) Pumping 15 bbl LCM pill w/ lube hourly. No MWD activity. Pump 10 bbl diesel sweep w/ lube trying to clear MWD.;Heavy LCM & cuttings returns at shakers on 3 x BU. Slow pumps to 360 gpm till shakers cleaned up.;Circulate BU @ 10,615' while building LCM pill to spot on bottom.;Transported to KGF G&I: Offloaded Solids = 126 Cumulative Solids = 1707 Daily Metal from Magnets 1 lbs. Total 18.25 lbs. Daily Losses to hole. 309 bbls 10/7/2019 Mix and spot 40 bbl 40 ppb LCM pill on bottom. Observe well - Static.;POOH 15 std. to 9201'.;Observe well (Static). Pump Dry job and fill trip tanks.;Continue POOH to top of BHA. Hole in good condition.;Stand back HWDP, Jars and Compressive drill pipe. Break off and clean out MWD filter sub. Pull up to bit and inspect same (1-1-NO-A-E-I-NO-DTF). Calculated hole fill 88 bbl. Actual fill 92 bbl.;Download and test MWD tools. Both BCPM and OnTrak tools bad. Lay down and replace both tools. Hole taking 4 BPH. PU & RU Hawkjaws on rig floor.;RIH on 5" DP t/ 665'.;Shallow pulse test MWD @ 665'. 450 GPM, 621 PSI. Recycle pumps multiple . Stage pumps to 600 gpms, 30 RPMs. Pump 25 bbl diesel, lube, graphite pill. Stage pumps to 650 gpms. Unsuccessful activating MWD. Ordering back up tool from dock. ~30 bbls loss to hole.;POH t/ OnTrak / BCPM. Plug in & reprogram OnTrak tool . LD float sub, filter sub and stop sub. LD BCPM on rig floor. 1/4 cup x 1/2" L x 3/16" thick coal like pieces on top of screen, but screen not packed off. 1/8" W x 4" L screen openings. A few pieces around pulsar below screen.;Lift pin end. Blow air from pin end downhill. A few pieces caught in 5 gal bucket. Blow air from pin end w/ vacuum on box end. Felt pieces in vac hose for 15 sec straight. Repeated process till no more pieces / trash felt in vac hose. Static losses ~4 BPH.;MU OnTrak / BCPM, float sub, filter sub and stop sub. MU Compressive DP, Jars & HWDP.;RIH on 5" DP t/ 665'.;Shallow pulse test MWD @ 665'. 400 GPM, 695 PSI. MWD test successful.;RIH f/ 665' t/ 4,913' @ ~60 FPM.;Shallow pulse test MWD @ 4,913'. 403 GPM, 1027 PSI. MWD test successful. Prep to slip & cut drill line.;Transported to KGF G&I: Offloaded Solids = Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 209 bbls Mix and spot 40 bbl 40 ppb LCM pill on bottom. 10/8/2019 R/U head pin and hoses to circ hole @ 1 bpm w/100 psi @ 4935'.;Drawworks making noise like the chains are slapping. Inspect chains and couplings - all good. Inspected traction motors and found brushes worn on one motor. C/O brushes and run drawworks. No slapping noise, drawworks running smoothly. Loss rate @ 6-7 BPH.;Hang blocks, slip and cut drilling line.;R/D head pin and hose. RIH out of shoe to 5120'. Break circulation and down link with ATK Rotary Steerable stab @ 431 gpm w/980 psi. and set tool to maximum build. Shut down pumps and allow blade to close on tool. (losses while down linking = 17 bbl).;RIH to 9575' Filling pipe every 2500'.;Break circulation. Bring up rate slowly to 208 gpm and 500 psi.;RIH to 10,430'.;W ash and ream f/ 10,430' to bottom @ 10,615'. 80 RPM, 11.5K TQ, 391 GPM, 1500 PSI. 45 bbl losses while reaming.;Drill ahead drctnl, 8-3/8 hole 10,615 - 10685 ft. Losses 40 - 100 bph. with LCM sweeps 30 min intervals. WOB 25, RPM 60, SPP 1450, GPM 400, TQ 16K. Cuttings return normal quantity - quality. SRV 10584, INC 25.07, AZ 241.43, Hole Position @ 10584' = 84' Low / 86' Right.;Lose pulse MWD, attempt regain with various attempts. No success. Discuss with Hilcorp Anchorage. Decision to call TD at 10,685 ft. TD 8-3/8 HOLE SECTION 10685 FT, THIS DATE 10-8-2019, AT 2230 HRS.;Mix and pump liner pill, total 75 bbls, displace with 190 bbls OBM (1200 ft) spot on bottom.;Flow check, fluid column static, POH 5" DP to 9300 ft. standing back in mast Screw in all stands, float not holding. No swab, no excess drag.;Flow check, column static, pump wt pill, resume POH 5" DP to 6700 ft. No further "U" tubing at DP.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 540 bbls 10/9/2019 POOH, standing back 5" drill pipe t/ 6200' , L/D 5" drill pipe t/5600'. (Cleaning OD & ID of pipe).;Suspend tripping temporarily. All hands sent to help vac up rain water on top deck and around shakers.;Continue POOH L/D 5" drill pipe, HWDP and Jars (Cleaning OD & ID of pipe).;Flow check at BHA, Handle BHA #8, L/D and inspect all components, download MWD. break bit #8 ( Grade 1 ,1 ,NO, A, IN, NO, TD). No damage, bearings tight, no axial movement, seals effective.;Clean rig floor, assist crane crew pump rain water to GPP.;Service rig.;R/D 5" handling equip, R/U 4" handling equip.;PJSM, flow check (No losses, column Static), commence P/U 3320 ft 4" DP in singles, POH standing back in mast for 6-1/8 drill out. 2500 ft P/U at 0600 hrs.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 52 bbls 10/10/2019 Finish picking up and standing back 3320' (35 std) of 4" drill pipe in derrick.;Clear rig floor and bottom of Beaver slide. While crane back loads boat.;Make up 7" casing inner string drilling BHA and stand back in derrick.;M/U pulling tool and pull wear ring. Had difficulty engaging slots, when pulled found a piece of stainless steel plate wedged in slot and folded over.;Install test plug and run in LDS. Change lower pipe rams from 5" to 7".;M/U 7" test assembly, R/U test equipment and test 7" rams and annular. 250 psi low / 3500 psi high for 5 min each. UPR door seal leaked on Ann high test. Tighten bonnet bolts and retested- Good. Small trickle of mud through upper annulus valve.;R/D test equip, remove test plug, return all valves to original positions.;Install wear bushing, run in LDS.;PJSM, R/U liner run tools and equip.;Flow check (Column Static), P/U reamer shoe with pup jt, M/U csg jt #1 (7", 29lb, L-80, DWC).;Weatherford power hydraulic unit fail. Replace with backup unit.;Flow check (Column Static), resume RIH jts csg (7", 29lb, L-80, DWC) to 2000 ft. Slow going, run speed 20-15 fpm as precaution to losses.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 52 bbls 10/11/2019 Continue to RIH w/ 7" Liner (29lb, L-80, DWC) to 2600'. Slow going, run speed 20-15 fpm as precaution to losses and to minimize overflow.;Stab into pipe with Volant tool, circulate and condition mud.;Continue to RIH w/ 7" Liner (29lb, L-80, DWC) f/ 2600' to 5001'. Slow going, run speed 20-15 fpm.;Circulate 2 X bottoms up. 180 gpm w/ 270 psi, 14-25% Flow, 155 PUW, 140 SOW w/ pump, 150 SOW w/o pump, 149 Rot, 26 rpm, 4-5K Tq. No losses observed while circulating.;Continue to RIH w/ 7" Liner (29lb, L-80, DWC) f/ 5001' to 5860'. (Did not see any additional drag or weight when entering open hole @ 5010').;PJSM, R/D csg run equip (bales, CRT, power tongs, all 7" handlng equip). R/U Baker work table, quick connect assy, false rotary, all related 4" inner string run tools. M/U XOs to Baker "Kickstand" assy, hang off on slide for quick access.;P/U pre-assembled Baker BHA #9, Bit #9 from mast. RIH same. Follow with 4" DP inner string to 3485 ft of 4" DP. Losses total 8 bbls while run inner string. Ramp down run speed to 12 fpm resulting in "0" losses from 1500 to current depth.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 8 bbls 10/12/2019 Continue to RIH with 4" DP inner string f/ 3485' to 5860' @ 10-12 fpm (Any faster and we start pushing fluids away).;Change out elevators from 4" to 5". P/U and M/U Lower and upper Quick Disconnect and HRD-E Liner Setting Sleeve to 4" inner string and 7" liner. R/D raised platform, c-plate, false bowl and slips.;M/U stand of 5" DP to top of HRD-E liner setting sleeve. Break circulation and take readings for base line. W/O pump PUW 275, SOW 220. W/ pump PUW 260, SOW 210, ROT 235, 20 rpm / 9-10 Tq., 30 rpm / 9-10 Tq, 40 rpm / 10-11 Tq , 178 gpm, 800 psi.;Continue to RIH w/ 7" liner and 4" inter string on 5" DP. to 9038'. Kelly up on every stand to eliminate overflow. Filling pipe , rotating and checking torque every row out of the derrick.;Wash and ream through coal seam @ 9038'. Ream full stand down and back up. 40 rpm, 19-24 Tq, 185 gpm, 1250 psi. Work once w/o rotation- Clean.;Continue to RIH w/ 7" liner and 4" inter string on 5" DP. Kelly up on every stand to eliminate overflow.;Packing off with torque and tight hole. Wash and ream remainder 7" liner on 5" DP (All Stands) to btm. Tag bit depth at 10685 ft. Note: P/U for flow check at 10595 ft with max gas 786 units. Approx 2 gpm flow reduced to "0" flow in 5 minutes.;Commence drill 6-1/8 pilot hole 10685 - 10709 ft. (7" csg shoe at 10649 ft.) WOB 4K, GPM 140, SPP 780, RPM 45, Motor RPM 70, Torque 25K, ROP 3 - 4 fph.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 265 bbls ggqp POH standing back in mast for 6-1/8 drill out. TD at 10685 ft pp p psi.;Continue to RIH w/ 7" liner and 4" inter string PU 7" liner ;Make up 7"pgp g ( ) pp g casing inner string drilling BHA and stand back in derrick.;M/U pulling tool and pull wear ring. Had difficulty engaging slots, when pulled found a piece of ggg pgp stainless steel plate wedged in slot and folded over.;Install test plug and run in LDS. Drill-in liner Continue to RIH with 4" DP inner string f/ 3485' to 5860' gp , M/U csg jt #1 (7", 29lb, L-80, DWC) yg q . Losses total 8 bbls while run inner string. Rig up Baker liner drilling system qy Discuss with Hilcorp Anchorage. Decision to @gppgp pg call TD at 10,685 ft. TD 8-3/8 HOLE SECTION 10685 FT, THIS DATE 10-8-2019, AT 2230 HRS.;Mix and pump liner pill, total 75 bbls, displace with 190 bbls OBM (1200 ft) spot on bottom. gp ;Commence drill 6-1/8 pilot hole 10685 - 10709 ft. Continue to RIH w/ 7" Liner (29lb, L-80, DWC) to 2600'. yp y Tag bit depth at 10685 gp 10/13/2019 Commence drill 6-1/8 pilot hole 10,709' - 10717'. (7" csg shoe at 10,687') WOB 10K, GPM 138, SPP 943, RPM 35, Motor RPM 70, Torque 26K, ROP 5 fph.;Pump and spot LCM pill on back side of liner. Stop rotation and set 30K down on the reamer shoe and let 6-1/8" drill off. Break off the TD and drop the 1- 3/4" bronze ball. Make up TD and ease on the pump at 1 BPM @ 50 PSI.;Ball on seat after 432 stks. Increase the pressure to release the HRD-E and saw the ball seat extrude at 3550 PSI after setting another 10K down. Pick up to see if released -No. Worked up and down and tried several more times even setting 220K down and still not releasing.;Start Secondary Release process for the running tool. Worked 14K down to the tool and then let wraps out and worked the same amount to the right to tighten up any possible loose connections. Picked up to see if free - No. Work it several times with no luck.;Got more aggressive and still could not release. Tried to let drill off for more rat hole to allow downward movement of the running tool w/o luck. Work pipe to see if the liner was free. Able to work free at 550K. New PUW-450K and SOW_280K. Continue working and trying to get off;the liner - no luck. Called the Baker Shop in Prudhoe and discussed situation. Tried torquing to the right 10K ft/lb's both in compression and tension to see if the torque fingers are engaged. Could tell no difference indicating they are still engaged and not released.;Called the Baker shop in Prudhoe again and they thought the same as us, get something moving and POOH with whatever. Discussed options with Hilcorp in town while rig worked pipe. Slacked off to 150K picked up and released from l iner. New PUW 290K.;Pick up 60' and monitor well. Static.;POOH to 10,349'.;Drain Stack, pull Wear Bushing and hang off string on test plug. Change out lower pipe rams from 7" to 5".;M/U test jt. and R/U BOPE test equipment to test on both 4" and 5" pipe. Flood stack and manifold with water. Line up and shell test stack and choke manifold.;Test BOPE as per Hilcorp and AOGCC standards and policies. All components tested to 250 psi low and 3500 psi high. Tests witnessed by AOGCC Inspector Mr. Adam Earl.;R/D test equip, remove test pump from rig floor, coil hoses, pull test plug, install wear bshg. Return all valving to working position.;Flow check, fluid column static, M/U top drv, attempt pump through drill string, no success, press to 3000 psi. Re-check surface valves and equip. Make second attempt, no success, drill string plugged. Bleed press, prep POH 5" DP.;PJSM, POH 5" DP, hookload 245K, no gain / loss. Wet string. Bit depth 7000 ft at 0600 hrs.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 141 bbls 10/14/2019 POOH 5" DP f/ 7000' bit depth to Baker 7" LSS and Upper Quick Connect tool @ . Inspect and Lay Down same. Secondary release shear pins still intact.;Change over handling equipment from 5" to 4". Clear floor of Baker and Weatherford 7" casing tools.;Continue POOH with 4" DP f/ 5992' to mud motor and bit.;Break off X/O, float sub. ported sub, stb and pup jt from top of motor. All plugged off with clay, coal and sand. Attempt to milk motor, motor seized up. Break bit off bottom of motor. Pressure wash inside of motor out as far as wand will reach inside, full of clay, coal and sand.;Clean rig floor from wet trip and cleaning out BHA tools.;Make up Baker SLZXP packer, latching bullet seal assembly w/ half mule shoe and LNR quick connect assembly on bottom of single of 5" DP and stand back in derrick.;Change handling equipment to 4" and make up Baker cement retainer on bottom of 4" DP. RIH same on 4" DP to 4720 ft.;Circ, confirm 4" DP clear. No gain / losses.;Resume RIH. Slow going, 50 fpm (On Verge of Flowback). P/U pre-assembled Baker SLZXP packer, latching bullet seal assembly from mast at stand # 59 and single. Flow check, RIH 5" DP to 9442 ft.;M/U cmt head and subs, XOs in prep for cmt job. L/D to deck for quick access when ready for use.;Flow check, Resume RIH 5" DP to 9266 ft. Prep for circ.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 0 bbls 10/15/2019 RIH to 10,352'.;Establish circulation 2 bpm 250 psi, 3 bpm 360 psi PUW - 240k SOW - 185k.;Space out. L/D 2 pups and P/U 1 sng. of 5" DP. Slack off engage HRDE Liner top hanger quick connect as per baker rep work over pull to ensure good latch pulling 50k over, attempt t/ establish circulation rate packed off, over pull to attempt to move casing pulling up t/ 430k no movement, pressure up;and attempt t/ establish circulation max psi 3650 psi, discuss options with town decision made to release from hanger and attempt to establish injection rate pressure up t/ 5000 psi bled off 30 psi in 15 min, attempt to release from HRDE Drop 1.75'' Ball pressure up t/ 3650 psi hpld f/ 2 min bleed.;down to 1000 psi f/ 6 min and sheared DOBS tool pulled free from HRDE, P/U 10' Set Cement retainer as per Baker rep, [Top of ret at 10,426'] The set liner top packer w/ 4k dn wt. P/U and Circulate Bottoms up @ 4 BPM 2000 psi, R/D Cement equipment.;Mix Dry Job clean and clear rig floor, Pump Dry Job. Pull 4 stds. PU and break dn cmt head.;POH standing back 5" DP to Liner hanger assem. Dogs were sheared and tool looked good. Clean and LD tool.;POH standing back 4" DP to CICR run tool.;L/D 3BB-K1 Mech CICR setting tool. No damage, tool intact.;Flow check (Column Static) Clear and clean rig floor while wait on arrival wireline operators.;Arrival wireline operators, PJSM, R/U unit, P/U perf guns (3- 3/8 OD, 3 ft, 6 SPF, .75" Shot) Attempt RIH through Jt 5" DP. Will not drift 5" pin. Rearrange wireline through Jt DP, M/U wireline pkf.;Flow check, RIH perf guns on wireline to 8800 ft at 0600 hrs.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 0 bbls 10/16/2019 RIH with perf guns on e-line to top of ret at 10,426'. PU to tool wt and fire perf gun. Shot 3' gun w/ 6 SPF. Hole stayed static. POH with wireline.;Shut Blind rams and establish an injection rate at 4 BPM and 500 psi. Pumped away 20 BBLS.;PU and MU Tripoint pkr. MU 2 jts 2 7/8 tbg and 4' mule shoed pup below packer. Hole taking 16 BPH while making up tools.;RIH to TOL.. Go slow through liner top with stinger and packer. Didn't see any drag. Continue RIH with the rest of the 4" DP and swap elevators over to 5". Run one stand of 5''.;RU to set packer and test csg. Set packer and test liner lap to 2800 psi for 30 min on a chart. Lost 20 Psi over 30 min. Bleed off and RD test equip. Unseat packer.;Continue RIH to just above Retainer with stinger.;Space out and set packer at 10,333' w/ bottom of stinger at 10,405'. RU cmt line. Hole PJSM w/ everyone involved.;With bypass closed circ dn string to ensure we can inject. injecting at 2 BPM and 300 psi. PU 5' and press bled off when the bypass opened. Schlumberger pump 2 bbls water then tested lines to 3000 psi.;Wait on Schlumbeger to get cmt batched up. Then we pumped 32 bbls spacer w/ the rig pumps. Swapped over to Schlumberger and they pumped 81 bbls cmt, [Slacked off and closed bypass at 75 bbls] followed by 2 bbls water. Swap back to rig pump 5 bbls spacer and swap to OBM.;Pump 54 bbls at 8 BPM before we caught pressure. Drop back to 4 BPM at 350 psi. Pressure continued to build and when we had the drill string cleared it had built up to 2550 psi. Shut in and monitor press and discuss options with town.;Build and hold pressure against cement with hesitation squeeze method. Continue hold pressure beginning at 2550 psi dropping to 1260 psi. Bleed to 1100 psi, hold stable.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 281 bbls pumped 81 bbls cement Able to work free at 550K. New PUW-450K and SOW_280K. RIH with perf guns on e-line to top of ret at 10,426' g Continue working and trying to get off;the liner - no luck. perf holes at 10426 ft p drill string plugged. P/U 10' Set Cementppppp retainer as per Baker rep, [Top of ret at 10,426'] Commence drill 6-1/8 pilot hole 10,709' - 10717'. (7" csg shoe at 10,687') pump cement retainer set 10426' p Change out lower pipe rams from 7" to 5".;M/U p test jt. and R/U BOPE test equipment to test on both 4" and 5" pipe. Flo pgp pp ;Continue RIH to just above Retainer with stinger.;Space out and set packer at 10,333' w/ bottomqp p j g p p of stinger at 10,405'. RU cmt line. Hole PJSM w/ everyone involved.;With bypass closed circ dn string to ensure we can inject. injecting at 2 BPM and 300 psi. gyypgjjg p PU 5' and press bled off when the bypass opened. Schlumberger pump 2 bbls water then tested lines to 3000 psi.;Wait on Schlumbeger to get cmt batched up.pyppgpp pgg Then we pumped 32 bbls spacer w/ the rig pumps. Swapped over to Schlumberger and they pumped 81 bbls cmt, [Slacked off and closed bypass at 75 bbls]pp p gpp pp g ypp [yp ] followed by 2 bbls water. Swap back to rig pump 5 bbls spacer and swap to OBM.;Pump 54 bbls at 8 BPM before we caught pressure. Drop back to 4 BPM atypgppppp gpp 350 psi. Pressure continued to build and when we had the drill string cleared it had built up to 2550 psi. Shut in and monitor press and discuss options with pgpppp town.;Build and hold pressure against cement with hesitation squeeze method. Continue hold pressure beginning at 2550 psi dropping to 1260 psi. Bleed to pg 1100 psi, hold stable.;Transported to KGF G&I: y p ;Continue POOH with 4" DP f/ 5992' to mud motor ggqp g and bit.;Break off X/O, float sub. ported sub, stb and pup jt from top of motor. All plugged off with clay, coal and sand. 10/17/2019 Packer set at 10,333' and stinger is at 10,405'. Monitor pressure from cmt squeeze job. Press at 1260 psi. By 07:12 pressure had came dn to 980 psi so we bled it dn .5 bbls to 660 psi. Shut in and it built to 764 psi.;Bled pressure dn slowly to 20 psi getting back 2 bbls. Monitor well and it still had slight flow that died down. PU to 225k to open bypass. Well static. Pull packer free with no increase in pull. PU 10' then let packer relax for 5 min. Slack of and packer moved down hole.;Continue PU and LD sng with cmt assem and one pup jt out together.;Put wiper ball in pipe and circ to clean pipe w/ tbg tail at 10,315'. Seen traces of spacer come back on bottoms up and some cmt contaminated mud from the inside of the pipe.;Monitor well and pump dry job. POH 9450'.;PU cmt assem. Break it all down and lay it dn.;POH checking connections for cmt rings. Started seeing cmt rings at 9240'. Break and clean cmt out of every connection on the 5" DP.;Change handling tools over to 4" and continue POH to RTTS. Trip drill resulting in 30 sec.response time.;Flow check, L/D RTTS and components.;Clear and clean rig floor.;M/U BHA #10, Bit # 10 7" scraper assy, RIH same. BHA Wt 16K.;Flow check, follow BHA with 4" DP to 5" DP at 6789 ft, follow 4" DP with 5" DP to 10260 ft.;Begin wash - ream 10260 to cmt retainer at 10426 ft at 0600 hrs. Take no weight, no fill, wellbore clear.;Transported to KGF G&I: Offloaded Solids = 76 Cumulative Solids = 3413 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 0 bbls 10/18/2019 Circ hole clean w/ clean out assem in the hole. Got back traces of spacer and contaminated mud.;Pump dry job and POH to BHA.;LD Clean out BHA.;PU Whipstock BHA. MU window mill, lower mill, flex jt,, upper mill, XO, 1 jt HWDP, XO, MWD stop sub, On Trak MWD, stb, BCPM, stb, stop sub, filter sub, and XO. Orientate tool. MU whipstock with trip anchor. [ Anchor 21k, Mill bolt shear 48k].;Upload MWD tools.[ Took 45 min.] RIH w/ 6 stds of HWDP.;Test MWD and Continue RIH to tag liner top at 4788 ft.;Cannot pass 4788 ft. Circ possible debris while tag lightly. Tag multiple times 4 - 15K. No success. Communicate with Hilcorp Anchorage. Discuss POH, remove whipstock. Whipstock, and RIH window mill only, dress liner top bore for possible obstruction.;Flow check, PJSM, POH 4" DP for whipstock assy adjustment.;Handle whipstock BHA #11, stand back HWDP, L/D MWD, remove whipstock - anchor, M/U window mill, lower mill, upper mill assy. RIH same.;Tag liner top hgr, pass through with no pump - rotation. Take no weight, no obstruction. Begin passes with pump - rotation. Ensure hanger bore clean, free of possible restriction.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 3413 Daily Metal from Magnets .5 lbs. Total 18.75 lbs. Daily Losses to hole. 0 bbls 10/19/2019 Wash and ream through top of liner hanger past restriction w/ all 3 mills 4 times. 4 BPM 80 RPM. Didn't see and obstruction or torque.;Circ Bottoms up at 8 BPM, 1575 Psi. Got back about 1 lb metal fines back on our 4 magnets.;Pump dry job and POH. Inspect and gage mills. Everything looks good.;PU whipstock and bolt into starting mill. Scribe to top of jt of HW. PU MWD and orientate. Upload MWD.;RIH w/ HWDP. And test MWD. Continue RIH to liner top.;Didn't see anything at top of liner. See slight bobble at 4788' but went right through. Sat down 15k at 4866'. PU and sat back down at the same spot about 3 times and it fell through. Continue RIH slow watching for any tight spots.;Resume RIH 4866 - 9850 ft. Tight hole, P/U 10 ft until free, set dn 10K, approx 5 ft tight hole, break free.;M/U top drv, wash dn 9850 to 10285 ft, take no wt. Begin take wt at 10285, wash, re-cip, set 10 - 12K on fill each pass. 303 - 350 gpm, 2550 psi. Continue wash 10285 - 10388 ft. No further downward progress. Fill possible compaction by whipstock anchor. P/U 220- S/O 180K.;Continued attempts wash past 10388 ft, no success. C/C fluids while consult with Hilcorp Anchorage. Decision to set whipstock. Set dn 25K , no indication anchor set, Set 25K once more, no anchor set. Set 30K on anchor, still no indication set. Test pull 250K, pull free anchor not set.;Consult with Hilcorp Anchorage, Decision to POH for clean out assy.;PJSM, flow check (Static), POH 5" DP for clean out BHA. 3700 ft at 0600 hrs.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 3413 Daily Metal from Magnets .5 lbs. Total 18.75 lbs. Daily Losses to hole. 0 bbls 10/20/2019 POH to whipstock BHA.;LD MWD and PU to whipstock inspecting the mills. All the mills looked good. Unbolt whipstock and install lifter on whipstock. Pull whipstock out of hole. Anchor was packed off solid with cmt. Pictures are in the o-drive. LD whipstock.;MU clean out BHA. Bit, csg scraper, and upper mill. PU jars and bumper sub. RIH w/ HWDP.;Cut drilling line & service rig.;RIH w/ clean out assem to 10,338'. Did take slight increase in wt at 4782' & 4846'. Both were spots that we had taken wt before.;Break circ 248 GPM, 1435 Psi. Wash dn from 10,338' to where we tagged at 10,386'. Clean out fill from 10,386' to top of the retainer at 10,426'. Circ for 5 min then PU 30' off bottom. Shut dn pump and go back to bottom. Get good mark on bottom with no pump.;PU 30' and circ hole clean. Stop pumps, slack off to tag retainer with no pumps. No fill, take no wt.P/U 30 ft, cont circ shakers clean.;Pump wt pill, Flow check, POH to tight interval at 10274 - 10264 ft. (Pull 4 - 6K over), (Take 4K down). Re-cip, rotate free. Pass through no pump. Take no wt. No up drag.;Flow check, POH 5 stds wet 5" DP. Pump slug, resume POH to top liner hgr.;Wash - ream mill assy through liner hgr bore (4760 - 4790), ensure bore free of obstruction. Total 5 passes. Pump slug, break TD XO.;Flow check, resume POH 4" DP to 2200 ft at 0600 hrs.;Transported to KGF G&I: Offloaded Solids = 72 Cumulative Solids = 3485 Daily Metal from Magnets .0 lbs. Total 18.75 lbs. Daily Losses to hole. 0 bbls 10/21/2019 Continue POH w/ clean out run to BHA.;Break off bit and scrapper and LD the rest of the BHA.;RU E-line. Start in the hole with the CIBP at 0900 hrs. Set at 10410' WLM, 10,419' DPM. POH and RD e-line.;Change out Hawkjaw . The lower makeup ram wouldn't return back to the relaxed position after usage.;MU whipstock BHA, Install new 45k brass shear bolt in whipstock and new anchor set at 21k. Pug in and upload MWD.;RIH with HWDP and Surface test MWD. Good test. Continue RIH to 5900' w/ no issues.;Continue RIH to 9230 ft.;Displacement indicates possible plugged drill string. Pump through string, confirm clear.;Flow check, resume RIH to 10112 ft.;Wash 10112 to tag at10412 ft while orient MWD to 60 LOHS.;Tag CIBP at 10412 ft. Set DW with 20K, and shear anchor. P/U 25K over, confirm set. S/O and set 50K D/W. Mill shear from slide. P/U to 10385 ft with no over pull. Whipstock in place. TOW 10395, BOW 10408 ft.;P/U 225K, S/O 180, ROT 200, RPM 80, Free Tq 8K, GPM 320, PSI 3200 Commence mill 7" csg window 10395 to 10405 ft at 0600 hrs.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 3485 Daily Metal from Magnets 94 lbs. Total 113 lbs. Daily Losses to hole. 0 bbls 10/22/2019 Mill window f/ 10,405' t/ 10,408'. Milling formation f/ 10,408' t/ 10,409'. The formation we are drilling in is sands tone and the starter mill won't drill the formation. Decision made to POH and put a bit on instead of the starting mill.;Pump dry job and POH to BHA.;LD MWD, starter mill, and lower string mill. MU new lower string mill and Kymera bit. RIH w/ HWDP.;Continue RIH w/ 6.125" Kymera bit & mills T/10,271', M/U TD, broke circulation, established parameters. P/U-212K S/O-175K ROT-195K RPM-60 Free TQ-7.5K GPM-350 SPP-1540 psi.;Washed down T/10,400' and set down 4K, P/U & racked back one std., P/U single & std., M/U TD, re-established parameters. P/U-220K S/O-180K ROT-200K RPM-80 TQ-7-8K GPM-277 SPP-1813 psi, washed & reamed down T/10,409', cont. to drill 20' of new formation T/10,427',;Reamed through window side area multiple times w/ upper & lower mills, shut down pumps, went through window multiple times w/ no issues.;Pulled into the window, R/U test chart, preformed FIT test w/ 9.0 ppg mud, 1916 psi for EMW of 13 ppg (ok), R/D testing equip., CBU at current time. PB1 Continue POH w/ clean out run to BHA.;Break off bit and scrapper and LD the rest of the BHA.;RU E-line. Start in the hole with the CIBP at 0900 hrs. Set at 10410' WLM, 10,419' DP ppg g . Anchor was packed off solid with cmt. Pictures are in the o-drive. LD whipstock. ne pg p Set 30K on anchor, still no indication set. Test pull 250K, pull free anchor not set.;Consult with Hilcorp Anchorage, Decision to POH for clean outpp p assy.;PJSM, flow check (Static), POH 5" DP for clean out BHA. 3700 ft at 0600 hrs.;Transported to KGF G&I p ;MU clean out BHA. pg p p BHA Wt 16K.;Flow check, follow BHA with 4" DP to 5" DP at 6789 ft, follow 4" DP with 5" gpy DP to 10260 ft.;Begin wash - ream 10260 to cmt retainer at 10426 ft at 0600 hrs. Take no weight, no fill, wellbore clear.;Transported to KGF G&I: TOW at 10395 ft set CIBP at 10419 ft ppp g Discuss POH, remove whipstock. Whipstock, and RIH window mill only, Mill window pgg g pgg ;Tag CIBP at 10412 ft. Set DW with 20K, and shear gg anchor. P/U 25K over, confirm set. S/O and set 50K D/W. Mill shear from slide. P/U to 10385 ft with no over pull. Whipstock in place. TOW 10395, BOW 10408ppp ft.;P/U 225K, S/O 180, ROT 200, RPM 80, Free Tq 8K, GPM 320, PSI 3200 Commence mill 7" csg window 10395 to 10405 ft at 0600 hrs.;T 10/23/2019 Pump dry job. Extra pipe that was in the derrick started to come untied and fall out of the fingers due to the high winds. Secure pipe in drk.;POH w/ whipstock mill assem to BHA.;LD bit and mills. Bit had some outer teeth broken and it was 1/8 out of gage. Upper mill was worn dn on the bottom section but the upper section was in gage. Clear floor.;Operate BOP equip and flush stack, Flush out choke and kill line. Clean floor.;PU and MU 6 1/8 directional drilling BHA. Everything was broke out so it took longer to make everything up. Ran a Reed PDC on a motor w/ 1.80 bend.;Plug in and upload MWD data, cont. M/U 6-1/8" directional BHA #16 F/102'-T/172', loaded radio active sources, cont. RIH w/ BHA #16 P/U HWDP F/102'-T/818', tested & warmed tools on first stand of 4" DP (ok). Started conditioning OBM mud in reserve pit #1 over shaker while tripping.;Cont. RIH w/ BHA #16 on 4" DP F/818'-T/4725', eased through top of 7" liner w/ no issues at 4763', cont. RIH w/ BHA #16 on 4" DP F/4763'-T/6935', held well control drill crew during trip, 67 sec total (good), got correct calculated pipe displacement during trip.;Started P/U & M/U singles of the deck & RIH F/6935'-T/7124'.;Held PTSM, crew change, cont. P/U & M/U singles of the deck & RIH F/7124'-T/9,266', M/U XO & started RIH out of the derrick w/ 5" DP, cont. to get calculated pipe displacement.;Cont. RIH w/ 5" DP F/9,266'-T/10,359', M/U TD, calibrated MWD tool, orientate tool face, exit window w/ no issues, washed to bottom and started directionally drilling ahead F/10,427' to current depth of 10,446'. P/U-210K S/O-165K ROT-180K GPM-283 SPP-2851 psi.;Transported to KGF G&I: Offloaded Solids = 56 bbls Cumulative Solids = 3541 bbls Daily Metal from Magnets 60 lbs. Total 340 lbs. Daily Losses to hole. 0 bbls 10/24/2019 Directional drill 6 1/8" hole sliding w/ 1.80° bend mudmotor f/ 10,446' t/10,606'. 275 GPM, 3050 Psi, 8 to 12k WOB, MW 9 ppg, ECD 10ppg.;Picked up to make a connection and it packed off and hung up. Attempt to work free. Finally broke it free in rotation. Reamed back to bottom the backreamed the entire stand. After we had it freed up we made a connection.;Surveyed at 10,553', Inc 40.34, Az 236.02. w/ a 12° dogleg. Rotate 1 sng dn to 10,635'. Slide f/ 10,635' t/ 10,668' and Take check shot survey at 10,616', 46.32 Inc, 233.72 Az, w/ a 9.83° dogleg. Rotate last sng on the std dn t/ 10,704'.;Directional drill 6 1/8" hole sliding & rotating w/ 1.80° bend mudmotor f/ 10,704' t/ 10,745'. Had to rotate 15' to make room to work the pipe and orientate. At 15:35 hrs we stalled the motor and it it went to 3800 psi. at that point we started loosing mud and it increased to 50 BPH.;Looks like losses may have started at 10,737'.;PU off bottom and monitor well. Mud falling slowly in hole. Circ slow and stay up above loss zone while we pump mud dn at 10 PPB LCM. lost about 22 bbls while circ at 125 GPM.;POH on elevators to 10,495' where we started having over pulls up to 50k. Backream f/ 10,492' t/ 10,467'. Pull on elevators to 10,458' and we had to start backreaming again. Ended up backreaming to 10,416'. Then pulled last 8' up into the window.;Put well on trip tank and monitored while bringing LCM content up to 20 PPB in circ pit, had zero losses, orientated tool face above window top, shut down pump, eased through window w/ no issues T/10,412', brought on pump to 150 GPM, monitored hole for half an hour while cont. to;bring hole volume mud up to 20 ppb back ground LCM, monitored hole while circ., (static).;Started washing & reaming to bottom F/10,412', seen slight seepage losses @ 10,512', cont. washing & reaming F/10,512'-T/10,735' w/ no hole issues, staged up pump, orientated tool face, washed to bottom F/10,735'-T/10,745'. P/U-220K S/O-170K ROT-190K SSP-2630 psi GPM-270.;Cont. directionally drilling ahead, had moderate losses while drilling, of 20 bbls per/hr., drilled F/10,745'-T/10,756' while cont. to loss mud, made decision to pull off bottom, slowed down pump rate, mixed & spotted a 20 bbl LCM pill on bottom w/ 40 ppb of Baracarb.;POOH on elevators F/10,756'-T/10,326', had no issues POOH. Total losses during the TIH, drilling, and TOOH =82 bbls. 20 bbl an/hr. average. Total losses for the day 197 bbls.;Lined up trip tank to circ. across the hole, monitor hole while letting pill soak, hole is taking 3 bbls per/hr. at current time, mixing second 20 bbl LCM w/ 40 ppb of barafiber while cont. to let fi rst pill soak.;Transported to KGF G&I: Offloaded Solids = 72 bbls Cumulative Solids = 3613 bbls Daily Metal from Magnets 3.5 lbs. Total 343.75 lbs. Daily Losses to hole. 197 bbls 10/25/2019 Monitor well on trip tank while setting up in the pipe. Hole taking about 5 BPH. Mixing 40 PPB barafiber pill.;RIH to 10,714' where it started taking wt. Wash and ream to bottom at 10,756 and space out where we could drill 60' without making a connection.;Rotary drill from 10,756' t/ 10,816'. Pumped 20 bbl barafiber pill when we started drilling. Hole was taking 60 BPH until pill went out the bit then it fell back to 28 BPH. Pumping 250 GPM, 2650 psi, 40 RPM, 8 to 10k TQ, 14k WOB.;Pump 2nd 20 bbl, 40 PPB barafiber pill. Stopping when pill was in pipe and taking a survey. [Depth 10,754', Inc 43.70, Az 225.77] Finish spotting pill in open hole. Shut dn and monitor well.;POH up into window with no issues.;Monitor well on trip tank. Hole was static.;RIH to 10,792' with no issues.;Orientate tool and slide drill f/ 10,816' t/ 10,892', 260 GPM, 2850 Psi, 6 to 12k WOB, Av loss to hole is 18 BPH. Ream full stand.;Take survey [10,835', Inc 46.24, Az 222.95] Get tool orientated and start slide. Pump 20 bbl 40 PPB barafiber pill. Slide Drill f/ 10,892', t/ 11,040'.;Cont. slide drilling F/11,040-T/11,044', started stacking weight, lost all diff, pulled off bottom to back ream std., kicked in rotary, had tight spot F/11,044-T/11,000', cont. to ream spot, while reaming up hung pipe @ 11,033', began working to free stuck pipe. P/U-220K S/O-175K.;attempted to free pipe w/ trapped TQ while beating down to 100K multiple times before cocking jar and jarring up to 150K over P/U weight, w/ no success called town, decision was made to built LVT lube pill to spot on back side in open hole to help free pipe.;Pumped 38 bbls of LVT lube pill, chased w/ 8.8 ppg OBM to spot LVT lube pill on back side, shut down pump, left 10 bbls of lube pill in pipe to spot as needed.;Cont. attempting to free pipe w/ trapped TQ while beating down F/250K -T/100K-70K multiple times, went to spot a couple of our bbls of LVT lube on the back side and pressured up, tried to establish circ. multiple times w/ no success, called town and discussed options, lined up Pollard wireline;to come out and make a free point back off while cont. to free stuck pipe.;Transported to KGF G&I: Offloaded Solids = 18 bbls Cumulative Solids = 3631 bbls Daily Metal from Magnets 2.5 lbs. Total 346.25 lbs. Daily Losses to hole. 298 bbls 10/26/2019 Pipe is stuck in the hole w/ the bit at 11,033'. Attempt to free pipe by applying torque and setting dn max wt. Also jarring up at 370k and parking pipe with strain on it while waiting on E-line. E-line hands arrived at about 10:30 hrs and fishing hands at 11:00 hrs. Broke off upper sng and LD same.;Orientate hands to the Spartan. Had meeting with E-line hands, Fishermen, and drilling manager about forward plan. Decision was made to back off string at the bottom of the XO below the jars. Blow dn TD and that caused a 35 bbl spill to the deck on the GP due to TT overflow. Clean OBM off GP deck.;RU Alaska E-Line. Prep string shot. Attempt to pull plug out of the top of the goose neck on the TD swivel. Couldn't get plug out. Decided to RU on jt of 5" DP. Work torque into pipe, Put 5 rd left hand torque in pipe. work pipe from 150 to 225, Put 3 more left hand turns. Work torque dn.;Put one more wrap in and work torque in. Have a total of 8 wraps in to the left that = 9k on the gage. Set slips and lock torque in with the rotary. Break out TD and RU E-line sheaves.;RIH with a string shot on E-line. Run collar log and set string shot at bottom of XO under jars. Fire string shot. Didn't see any indication of shot going off on the rig floor. POH.;Break off packoff and pull string shot out of pipe. Shot had fired. Remove valve and XO. Lower and RD sheaves. MU TD and pull pipe off slips. Work pipe dn to 150k and PU and never pulled over 220k. pipe was free.;Circ. STS to even out mud weight, shut down pump, flow checked (static), pumped 20 bbl slug 1 lb. over mud weight.;POOH F/10,404 to surface, P/U-205K S/O-170K, backed off at the bottom of the XO between the jars & HWDP, recovered everything but 629' of BHA #16, broke off XO's on jars & L/D jars.;Drained stack, P/U test plug, latched into wear ring, backed out lock downs, pulled wear ring, set test plug on 5" test jt., M/U dart valve, TIW, side ported sub to test jt., filled stack w/ water, purged out air, started shell test.;AOGCC Rep Brian Bixby will be here at 07:00 hrs. to witness BOP test.;Transported to KGF G&I: Offloaded Solids = 90 bbls Cumulative Solids = 3721 bbls Daily Metal from Magnets 0 lbs. Total 346.25 lbs. Daily Losses to hole. 30 bbls Slide Drill f/ 10,892', t/ 11,040' Stuck BHA )p p g g recovered everything but 629' of BHA #16, broke off Directional drill 6 1/8" hole sliding w/ 1.80° bend mudmotor f/ 10,446' t/10,606'. 275 G p pp f Baracarb.;POOH on elevators F/10,756'-T/10,326', had no issues POOH. Total losses during the pp TIH, drilling, and TOOH =82 bbls. pp 20 bbl an/hr. avera y[ ;Cont. slide drilling F/11,040-T/11,044' pp g . Decision was made to back off string at the bottom of the XOp below the jars. Blow 10/27/2019 RU to test BOPs. Put shell test on the BOPs w/ 5" DP.;Test BOPs with AOGCC inspector Brian Bixby witnessing tests. Test all BOP equip to 250 and 3500 psi. Test gas alarms, PVTs, and accumulator.;RD test equip. Set wear ring.;Do a rig and derrick & rig inspection because of the excessive jarring that has occurred over the last couple days.;Prep to PU BHA, PU screw in fishing BHA. Screw in sub, bumper sub, fishing oil jars, 6 - 4 3/4 DCs, Accelerator jar, & XO = 223.96.;Started RIH out the derrick w/ 4" DP F/223' to TOL (7") at 4,763', went through liner w/ no issues , started to centrifuge our MW back at surface to 8.9 ppg.;Cont. RIH w/ fishing BHA F/4763'-T/10,381' just above window top, P/U-215K S/O-175K.;Lined up pump and displaced hole volume mud from 9.4 ppg to 9.0 ppg, GPM-430 SPP-3000 psi, shut down pump after we had 9.0 ppg around.;P/U single, washed down and tagged top of fish @ 10,405', P/U and kicked in rotary, washed back down on fish, pressure came up to 750 psi, shut down pump, run TQ up to 10K and trapped TQ, reciprocated pipe to work TQ down to screw in sub, P/U to 250K and S/O to 150K,;repeating this multiple times bringing trapped TQ up to 13K, P/U-215K S/O-175K GPM-154 SPP-470 psi.;Started jarring on fish, S/O to 150K-100K to cock jars, P/U to 260K-340K, firing jars and pulling up to 370K and holding it, also trapping 10K TQ and pressuring up drill string to 1000 psi while cont. to jar on fish, currently cont. to attempt to jar fish free.;Transported to KGF G&I: Offloaded Solids = 0 bbls Cumulative Solids = 3721 bbls Daily Metal from Magnets 0 lbs. Total 346.25 lbs. Daily Losses to hole. 0 bbls 10/28/2019 Attempt to free pipe by jarring up to 370k. Also tried applying torque and spudding pipe down.;Space out for running string shot. LD sng and PU 20' of pups.;Lost pipe drift while drifting pup jts. Knew drift wasn't left in pups but still couldn't find it. Pulled mouse hose and turned it over but no drift. Decided that it must have went down the rotary pin hole and into the flow box.;Put left hand torque in pipe 3 rds at a time, then work the pipe. Had 9 rds in and decided to put one more rd in and pipe backed out of screw in sub. Brought on rig pump and watched down hole for returns. Hand noticed drift was floating in hole. Had hand go under rotary and grab drift.;Went back to circ and rotated dn on the fish. Started to pressure up so we shut pump dn and torqued into fish. Worked pipe and applied more torque to 15k. Bled off pressure and released right hand torque. Then worked the pipe to get the torque out.;Then we started putting left hand torque back in 3 rds at a time and working pipe. Got a total of 9 rds worked and locked in. Set pipe in slips with 160k, with the table locked and released the torque from the TD.;RU e-line to run string shot. Get shot made up and Ready to RIH.;RIH with E-line. Tagged up at 10,560' WLM. This would put it at the connection between the 5th and 6th jt of HWDP. Attempted to get by this spot several times w/ no success. POH w/ e-line. Had a little bit of fine coal on tool. RD e-line so we can check torque on pipe.;MU TD to pipe. With TD brake locked, PU on the pipe and check to make sure left hand torque was still on the pipe, and it was. PU 40k over up wt to make sure we were not backed of. Set back in slips with 160k on them.;Break out TD and RU all the e-line equip again.;Tools showed up on the chopper. MU 1 7/16" swedge, knuckle jt, spangs, and wt bars. RIH to 10,560' and tool got stuck. Work tool jarring up for 15min and it finally came free. POH and break dn tool. Had just a little bit of fine coal stuck in the end.;MU string shot and RIH. Set tool across the bottom of the 4th jt of HWDP and the top of the 5th at 10,527'. Fired shot and had good indication on the rig floor.;POOH w/ E-line, verified shot fired, R/D E-line, put 3 wrap to the left in the string, trapping 5K TQ, worked string down to 150K & up to 250K multiple times w/ no indication of being free, cont. to put 2 wraps to the left in the pipe each time for a total of 13 wraps, each time checking;the trapped TQ left in the string & losing half the TQ, pressured DP to 400 psi looking for any pressure loss while working pipe, no luck, made decision to let all the left hand TQ out and apply 7 wraps to the right in the pipe, trapping 10K TQ, worked pipe, checked wraps left in pipe and only;got back half a wrap, decided to put 9 wraps in to the left, trapping 6K TQ, worked pipe, put 5 more wraps to the left, trapping 8K TQ, worked TQ down, brought up pressure on DP to 400 psi, pulled up to 350K, weight started to fall off and pressure started to decrease, cont. to pick up, brought on;pump on a 50- GPM, established circ., pulled std. high, washed back down, weight dropped down to 220K, shut down pump, broke off pups, screwed back in, brought on and staged up pumps to GPM-370 SPP-2460 psi P/U-210K S/O-160K, pipe was free w/ extra weight on the hook.;Pumped 25 bbl barafiber LCM pill and circ. STS to clean up hole, pumped 20 bbl slug 1.5 lbs over MW, flow checked well (ok).;POOH F/10,527' to surface, L/D accelerator jar & fishing oil jar, racking back DC, recoved 4 jts of HWDP, got calculated hole displacement during TOOH.;Currently M/U cement clean assembly w/ mill tooth bit and racking back in derrick;Transported to KGF G&I: Offloaded Solids = 162 bbls Cumulative Solids = 3883 bbls Daily Metal from Magnets 0 lbs. Total 346.25 lbs. Daily Losses to hole. 0 bbls 10/29/2019 Lay out and strap 2 7/8 tbg stinger. PU 15 jt 2 7/8 tbg with a short mule shoe jt on bottom.;Service rig. Grease TD, Blocks, Crown, and drwks. Change handling equip to 4".;RIH. Went through top of 7" liner with no issues. Went through window with no issues. Tagged fill at 10,515'. Washed dn to 10,527' where we tagged the top of the fish.;Circ bottoms up. Got back some fines over the shakers, but not a lot.;MU cmt head with foam ball on top of closed TIW valve. Hold PJSM. Pump 2 bbls of water with Schlumberger. Shut down and put foam ball in line. Pump 1 more bbl of water and test lines to 2500 psi. good test. Batch up and pump 10.1 bbls of cmt, followed by 2 bbls of water.;Shut in Schlumberger and open TIW valve w/ foam ball on top. Pump 115 bbls OBM at 4.5 BPM slowing dn to 3 bpm for last 5 bbls. Shut dn pump and break off cmt head.;Pull 5 stds slow to pull tbg stinger out of the cmt. Cement in place at 16:30 hrs.;Put another foam ball in the pipe and circ until clean.;Pump dry job, PO0H & L/D 2-7/8" cmt stinger, vacuuming footballs through each jt., cont. working on pit cleaning, had calculated hole fill during trip.;Held PTSM, crew change, cleaned & cleared rig floor, P/U BHA #18, 6-1/8" cmt clean out assembly, RIH F/192' to TOL @ 4763' went through liner top w/ no issues, cont. RIH and had 8K set down @ 4784', P/U checked depth per DP tally (spot on), attempted to go through again and;set down same spot, P/U & came down and set 3K on it, turned it one wrap and it fell right through.;Cont. RIH filling on the fly every 3500' F/4784' to 10,049' tagged cmt stringer, screwed in and started washing down, current depth of 10,093', got calculated pipe displacement during TIH.;Transported to KGF G&I: Offloaded Solids = 36 bbls Cumulative Solids = 3919 bbls Daily Metal from Magnets 0 lbs. Total 346.25 lbs. Daily Losses to hole. 0 bbls 10/30/2019 Wash cmt stringers f/ 10,093' t/10, 273' where it started holding light wt. Clean out to 10,337' and it started holding 3 to 5k bit wt. Firm cmt.;Drill cmt f/ 10,337' t/ 10, 408'. Bottom of window.;PU to top of window. Circ hole clean getting back cmt.;Get SPRs, Monitor well, Pump dry job.;POH to 10,000'. Secured well for a fire drill at 10:00 hrs. Good response on drill. Continue POH. Broke bit, bit sub and float sub out and stood back 4 3/4 DCs.;PU directional drilling BHA. Adjust motor to 1.80°, MU bit and orientate to MWD. PU NM flex collar.;Plug into tool and upload. Had to change some software because tool was set up for a rotary steerable.;Cont. P/U remainder of BHA #19, NM flex collars, jar, and 4" HWDP while cont. to clean mud pits.;Slip & cut 134' of drill line, preformed rig serviced , finished cleaning pits 1-3, and started building new batch of MOBM mud.;RIH w/ 3 stds. of 4" DP, XO, RIH w/ 2 stds. of DC for push pipe, XO & cont RIH w/ 4" DP T/1,832'.;Held PTSM, crew change, cont. RIH F/1832'-T/3,092', filled pipe & shallow tested MWD tools (ok).;Cont. RIH F/3,092' to TOL @ 4763', went through liner w/ no issues, cont. RIH F/4763'-T/10,307', fill pipe every 3500', had calculated pipe displacement during trip.;K elley up & washed down F/10,307'- T/10,396', orientated tools face at the TOW, eased down through window w/ no issues, started time slide drilling, current depth 10,413'. P/U-215K S/O-170K GPM-247 SPP-2138 psi.;Transported to KGF G&I: Offloaded Solids = 108 bbls Cumulative Solids = 4027 bbls Daily Metal from Magnets 0 lbs. Total 346.25 lbs. Daily Losses to hole. 0 bbls pgg pyj Good response on drill. Continue POH. Broke bit, bit sub and float sub out and stood back 4 3/4 DCs.;PU directional drilling BHA. Adjust motor p gj to 1.80°, MU bit and orientate to MWD. PU NM flex collar.;Plug into tool and upload. Had to change some software because tool was set up for a rotary gp g py steerable.;Cont. P/U remainder of BHA #19, NM flex collars, jar, and 4" HWDP while cont. to clean mud pits.;Slip & cut 134' of drill line, preformed rig serviced , jpppg finished cleaning pits 1-3, and started building new batch of MOBM mud.;RIH w/ 3 stds. of 4" DP, XO, RIH w/ 2 stds. of DC for push pipe, XO & cont RIH w/ 4"gp g p pp DP T/1,832'.;Held PTSM, crew change, cont. RIH F/1832'-T/3,092', filled pipe & shallow tested MWD tools (ok).;Cont. RIH F/3,092' to TOL @ 4763', went gpp()@ through liner w/ no issues, cont. RIH F/4763'-T/10,307', fill pipe every 3500', had calculated pipe displacement during trip.;K elley up & washed down F/10,307'-gppyppp T/10,396', orientated tools face at the TOW, eased down through window w/ no issues, started time slide drilling, . Change handling ypggjg j g equip to 4".;RIH. Went through top of 7" liner with no issues. Went through window with no issues. cement BHA in hole qp g g g p jg BHA, PU screw in fishing BHA. Screw in sub, bumper sub, fishing oil jars, 6 - 4 3/4 DCs, Accelerator jar, & XO = pp p p ppg down and tagged top of fish @ 10,405', P/U and kicked inppg p p p ppg g rotary, washed back down on fish, pressure came up to 750 psi, shut down pump, run TQ up p gp Pump 115 bbls OBM at 4.5 BPM slowing dn pp y g p to 3 bpm for last 5 bbls. Shut dn pump and break off cmt head.;Pull 5 stds slow to pull tbg stinger out of the cmt. the top of the fish.;C qp g agged fill at 10,515'. Washed dn to 10,527' g Ta 10/31/2019 Time drilling 6 1/8" hole at 1'/ hr w/ mudmotor f/ 10,413' t/10, 419'. 260 GPM, 2200 Psi, 1 to 2k WOB.;Time drilling 6 1/8" hole at 1'/hr w/ a mud motor f/ 10,419' t/ 10,422'. 260 GPM, 2160 psi. 1.5 to 2.5k WOB. Getting 20% sand. Still building vol in pit 1.;Time drilling 6 1/8" hole at 2'/hr w/ a mud motor f/ 10,422' t/ 10,427'. 260 GPM, 2160 psi. 2 to 3k WOB. Getting 25% sand and hard cmt. Building vol in pit 1. Running centrifuge and maintaining mud wt at 9 ppg.;Looks like it wants to pull back to the old hole. Work pipe to get it back to 110° to the left and get away from the old hole. Go back to 1'/hr and time drill f/ 10,426' t/10,432', formation percent dropped from 25%-10%. 261 GPM, 2140 Psi P/U-215K S/O-170K.;Called town, decision was made to orientate tool face to 150° left, reduced GPM to 220 and attempt to hold 5K WOB, drilled F/10,432'-10,436' w/ no WOB, P/U & worked pipe, re-orientated tool face to 150° to the left, applied 2K WOB.;kept pumps at 220-GPM and went back to time drill at 1'/hr. F/10,436'-T/10,437', cutting sample showed formation percent dropped to 5% and cmt was soft & mushy coming back.;Cont. time drilling at 1'/hr., while holding tools face at 145°-150° left, cont. to attempt to get departure from old well bore. GPM-220 SPP-1732 psi, F/10,437'-T/10, 439', w/ no success, P/U off bottom and started troughing to help w/ departure, called town, decision was made to slide drill.;T/10,448' and resume time drilling at 1'/hr, while holding tools face at 145°-150° left, right above a 10' coal at 10,455', attempting to get kicked off in coal seam. current depth 10,448'.;Transported to KGF G&I: Offloaded Solids = 0 bbls Cumulative Solids = 4027 bbls Daily Metal from Magnets 4.5 lbs. Total 350.75 lbs. Daily Losses to hole. 0 bbls 11/1/2019 Drill dn sliding down f/ 10,448' t/ 10,453'. Looking for top of 5' coal to assist in kick off. Pump packed off w/ a 250 Psi increase. Shut pump down and pipe was hung up. 750 Psi was trapped on DP. Bleed pressure off and cock jars. PU to 350k and pipe jarred free. Work pipe and get toolface back;150° left. Slide back down but pipe packed off at 10,444' again. Shut dn pump and bled press. Pipe pull free w/ a 10k overpull. Work pipe and get toolface back to 150° left. Slide back down to 10,450'. Getting 20% cmt w/ trace of sand, but mostly LCM mud products. Seen an increase in gas f/ 3 t/5 U.;Time drilling 6 1/8" hole at 1FPH f/ 10,450' t/ 10,453'. Started showing traces of formation with very little cmt and mostly mud products. Holding 150° to the left to get away from the old well, started bring mud system up to 5 ppb w/ soltex & baratrol.;Cont. time drilling 6 1/8" hole at 1.5FPH f/ 10,453' t/ 10,460', cuttings sample started showing 40% formation with cmt & mud products. Holding 150° to the left to get away from the old well. P/U-215K S/O-172K GPM-239 SPP-1980.;Cont. time drilling 6 1/8" hole, staged up ROP F/4-T/12 FPH f/ 10,460' t/ 10,461', started seeing an increase in weight & diff, WOB-4.9 Diff 20 psi, at 10,462' weight & diff fell off and tool face went to 80° left, P/U and worked pipe, re-orientated tool face, eased back to bottom,;cont. time drilling 6-1/8" hole at 3 FPH, F/10,461'-T/10,466', seen increase in diff (80 psi), but very little weight (.9k), cuttings sample from 10,462 showed 90% cmt/ mud product & 10 formation, call town, decision was made to slide drill ahead and see if we could get it to stack more WOB.;Cont. time drilling 6-1/8" hole at 6 FPH, F/10,466'-T/10,468', WOB-1.6K Diff-35 psi, cutting sample came back w/ 60-70% formation/mud product & 30% cmt, cont. time drilling 6-1/8" hole ahead at 10 FPH, F/10,468'-T/10,469', WOB-5.1K Diff-61 psi, while cont. to hold tool face at 150° left,;cutting sample came back again w/ 60-70% formation/mud product & 30% cmt, Cont. time drilling 6-1/8" hole ahead at 12 FPH, F/10,469'- T/10,471', WOB-5.2K Diff-57 psi, started to see weight drill off while holding some diff pressure and tool face holding at 150° left.;P/U & had to work it a little while to get our tool face orientated to 150° left, called town, decision was made to start to trough. P/U-215K S/O-172K GPM-241 SPP-1950 psi.;began to trough F/10,415'-T/10,470' for 2 hrs , while cont. to catch sample marks from 10,468' & 10,470', both showing 80% formation/mud products & 20% cmt.;Cont. time drilling 6-1/8" hole at 2 FPH, F/10,470'-T/10,471', WOB-0 Diff-0 psi, while holding tool face at 150°-170° left, cutting sample F/10,471' still showing 80% formation/mud products & 20% cmt, plan forward is the bring ROP up by 1' every/hr.;Cont. time drilling 6-1/8" hole at 3 FPH, F/10,471'-T/10,473', WOB-1.5K Diff- 34 psi, while holding tool face at 150°-170° left, cutting sample F/10,472' started showing 90% formation/mud products & 10% cmt.;Cont. time drilling 6-1/8" hole at 4 FPH, F/10,473'-T/10,476', WOB-2.5K Diff-36-46 psi, while holding tool face at 140°-150° left, cutting sample F/10,475' still showing 90% formation w/ less mud product & 10% cmt, formation cutting are looking like shavings from PDC bit.;Cont. time drilling 6-1/8" hole at 5 FPH, F/10,476'-T/10,481', WOB-3.1K Diff- 58 psi, while holding tool face at 90°-110° left, cutting sample F/10,479' still showing 90% formation/mud products & 10% cmt.;Cont. time drilling 6-1/8" hole at 6 FPH, F/10,481'-T/10,488', WOB-3.5K Diff-38-62 psi, while holding tool face at 80°-90° left, brought ROP to 7 FPH @ 06:00 hrs.;Transported to KGF G&I: Offloaded Solids = 72 bbls Cumulative Solids = 4099 bbls Daily Metal from Magnets 4.5 lbs. Total 355.3 lbs. Daily Losses to hole. 0 bbls 11/2/2019 Cont. time drilling 6-1/8" hole at 6 FPH, F/10,488', t/ 10538' WOB-3.5K Diff-38-180 psi, while working tool face up t/ 30-45 left, brought ROP to 12-28' working off TF and diff and up gpm t/ 260 gpm.;Wash ooh t/ 10490' (ok) ream slide @ 60 rpm w/ 6k TQ back to btm X 2 (ok).;Resume slide drilling @ 30-45 left f/ 10,538' t/ Kelly dn @ 10,587' WOB 6-8k Diff 100-170 psi, @ 260 gpm @ 2250 psi.;Wash ooh t/ 10,488' (ok) ream slide @ 60 rpm w/ 6k TQ back to btm @ 10,587' X 2 (ok) Make connection survey still hot w/ 25.98 degs.;Resume slide drilling @ 30-45 left working off TF and diff. f/ 10,587' t/ Kelly dn @ 10,682' WOB 6-8k Diff 100-170 psi, @ 260 gpm @ 2250 psi started taking losses @ 10,571' +- 60 bph slowed t/ 220 gpm and continued drilling ahead to Kelley dn w/ total 38 bbls lost and holding.;straight pull off btm t/ 10,672' ok and back reamed t/ 10,585' (ok) Ream @ 60 rpm w/ 6k TQ back to btm @ 10,682' X 2 (ok) Make connection and staged up t/ 230 gpm and got a good survey @ 10,632' w/ INC @ 35.07 and AZ @ 221.35 w/ no losses.;Orientate and resume slide drilling F/10,682' w/ 230 gpm SPP-2040 psi, WOB 5-7K, @ 10,695', started seeing seepage losses, pumped a 10 bbl 8.9 ppg LCM pill, at 80 lbs per/bbl around while drilling ahead, losses healed up.;cont. slide drilling ahead F/10,695', w/ 224 gpm SPP-2140 psi, WOB 5-7K, @ 10,727', started seeing seepage losses, pumped a 10 bbl 8.9 ppg LCM pill, at 80 lbs per/bbl around while drilling ahead, seepage losses slowed down.;Cont. drilling ahead w/ minimal losses F/10,727', w/ 224 gpm SPP- 2172 psi, WOB 7-8K Diff 299, @ 10,745', lost all returns, slowed pump rate to 50-GPM, P/U to 10,697', pumped 20 bbl 8.9 ppg LCM pill, at 80 lbs per/bbl down pipe at 100-GPM, while filling back side from TT, got well stood up;w/ 10% return flow once pill rounded the corner, shut down pumps, POOH F/10,697'- T/10,397' w/ no issues, monitored hole for 1 hr. while circ. across hole w/ TT, zero losses.;RIH below window @ 10,418', staged pumps up to 230-GPM w/ no losses while circ., cont. RIH F/10,426'-T/10,479', took 10K weight, P/U, brought on pumps (220-GPM), orientated tool face and washed right through, cont. RIH F/10,479'-T/10,679', Kelley up, staged up pumps to 220-GPM,;washed down and tagged up @ 10,743'.;Attempted to drill ahead, lost all return, P/U & slowed pumps T/10,685' (70-GPM), lined up and pumped 20 bbl 8.9 ppg LCM pill, at 80 lbs per/bbl down pipe at 100-GPM, while filling ba ck side from TT, got well stood up w/ 10% return flow once pill rounded the corner, shut down pumps, POOH;F/10,685'-T/10,388' w/ no issues, monitored hole, while circ. across hole w/ TT, zero losses.;Cont. monitoring well on TT while building mud volume. Total losses for the day 273 bbls. Distance to plan: 6.92 6.75 Low 1.51 Right.;Transported to KGF G&I: Offloaded Solids = 0 bbls Cumulative Solids = 4099 bbls Daily Metal from Magnets .5 lbs. Total 355.8 lbs. Daily Losses to hole. 273 bbls Cont. time drilling 6-1/8" hole at 6 FPH, F/10,488', t/ 10538' pp psi, WOB 7-8K Diff 299, @ Time drilling 6 1/8" hole at 1'/ hr w/ mudmotor f/ 10,413' t/10, 419'. 260 GPM, 2200 Psi, 1 ng gp ', lost all returns, slowed 10,745', Start last sidetrack. @gpg ;Cont. drilling ahead w/ minimal losses F/10,727', 11/3/2019 Cont. monitoring well on trip tank w/ bit above window @ 10,388' while building mud volume. w/ .5 bbl loss in 8 hrs.;Cont. monitoring well on trip tank w/ bit above window @ 10,388' while building mud volume. Worked pipe once and moved 10 bbls in drill string w/ 1 bbl loss in 12 hrs.;Cont. monitoring well on trip tank w/ bit above window @ 10,388', finished first 298 bbl batch of MOBM w/ 40 ppb of back ground LCM. working on mixing 70 bbl LCM pill w/ 80 ppb of LCM for spotting in case of total losses. Losses while circ. over top of hole over the last 18 hrs=1 bbl.;Cont. working on mixing 70 bbl LCM pill w/ 80 ppb of LCM in slug pit#1. Worked on camera in the derrick, changed out shaker screen from API 200's to API 80's to reduce the amount on LCM being strip out of our mud while drilling.;P/U std. RIH T/10,420' just outside BOW, pumped 10 bbls through MWD tools to ensure LCM material wasn't settling out and plugging tools, finished mixing 70 bbl LCM pill w/ 80 ppb of LCM, started working on 2nd 298 bbl batch of MOBM w/ 40 ppb of back ground LCM, losses over;the last 21 hrs. =1.3 bbls.;Cont. to work on 2nd 298 bbl batch of MOBM w/ 40 ppb of back ground LCM, losses over the last 24 hrs.=1.8 bbls.;Transported to KGF G&I: Offloaded Solids = 54 bbls Cumulative Solids = 4153 bbls Daily Metal from Magnets 0 lbs. Total 355.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right Daily Losses to hole. 1.8 bbls total = 304.8 bbls from this event 11/4/2019 Cont. to work on and finish 2nd 298 bbl batch of MOBM w/ 40 ppb of back ground LCM, losses over the last 30hrs.=2.2 bbls. Take on diesel from platform, house cleaning and rig maintenance.;Take hole off trip tank and line up on Pit #3 short system. Rih two std f/ 10,387'- t/ 10,577' (OK) work full std and circ @ 107 gpm @ 640 psi and add LCM product to bring back ground of hole mud t/ 40 ppb LCM stage up t/ 220 gpm Loss rate stable.;Rih f/ 10, 584' and taking weight 25- 30k X3 @ 10,595' (coal ) wash ream t/ 10,620', dn pump and rotation. Rih taking weight 20-25k wash ream @ 10,652' Rih t/ 10,717'. Safety wash and ream @ 40 rpm @ 6-7k @ 1320 psi @ 174 gpm.;Rotary drill f/ 10,745' t/ 10,750' w/ 140 bbls of loses and zero to 13% returns, orientate and slide drill @ 30 L t/ 10,756' @ 1680 psi @ 200 gpm while spotting 20 bbl 80 PPB LCM pill w/ additional 268 bbls lost.;Pooh back through wi ndow and into csg t/ 10,367' @ monitor well on trip tank w/ no losses for 2 hrs.;RIH T/10,432', oriented tool face 90° left, GPM-205, SPP-1730 psi, shut down pump, RIH w/ no issues T/10,722', tagged LCM fill, Kelley up, washed down T/10,754', GPM-100, SPP-670 psi, proceeded to pump & clean up open hole, lost returns, slowed pump rate 50 GPM, tried to re-establish;circ., w/ no success, shut down pump, back side was full, lost 17 bbls while pumping, POOH on trip tank, had a 30K over pull @ 10,752', worked though on elevators, pulled back in the window @ 10,385',;monitor hole on TT, while finishing up mixing slug 2.5 ppb over MW, lost 1.5 bbl over 2 hr., pumped slug, slug ineffective, built 2nd slug and pumped, pipe came dry.;POOH F/10,385'-T/4749' TOL, flow check @ TOL (ok), cont. POOH F/4749' to BHA #19, racking back BHA in derrick at current time., while working on 3rd 298 bbl batch of MOBM w/ 40 ppb back ground LCM, hole fill during trip was 10 bbls over calculated.;Transported to KGF G&I: Offloaded Solids = 0 bbls Cumulative Solids = 4153 bbls Daily Metal from Magnets 0 lbs. Total 355.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right Daily Losses to hole. 429.5 bbls total = 734.3 bbls from this event 11/5/2019 Continue working bha, Continue working on 3rd 298 bbl batch of MOBM w/ 40 ppb back ground LCM.;Monitor hole clean floor Load door w/ cmt stinger static loss rate @ zero.;P/up 14 jts 2-7/8" tbg stinger @ 441.46' total w/ defuser and btm 6' has 40 -3/8" hole @ +- 60 deg phased.;Rih w/ 2-7/8" cmt defuser on dp out of derrick broke circ twice to window taking weight @ 10.690'.;wash cmt stinger to btm f/ 10,690' t/ 10, 756' and stage rate t/ 220 gpm 1140 psi pick up and drift w/ no pump ok w/ 12 bbl loss while washing rack back stand.;Space out r/up cmt head and lines load foam balls PJSM & pressure test lines 300/3000 psi (ok ).;Pump 25 bbls 13.55 ppg Class G Cement @ 4 bpm, chase w/ 5 bbls H2O, Drop top ball, Displace with 113 bbls 9.1 ppg OBM, ICP 526 psi @ 5 bpm FCP 800 psi @ 4 bpm.;L/D Cement head and Pull and stand back 10 stands of DP f/ 10752' t/ 9769'.;Line up and squeeze cement staging pumps t/ 1.3 bpm 500 psi max psi 12.2 bbls squeezed injection started @ 415 psi, shut down pressure bled down to 440 psi and held, bleed off pressure CIP 2010 hrs.;Line up and Circulate surface to surface 7 bpm 1450 psi no cement on bottoms up, pump slug.;POOH on Elevators f/ 9769' t/ 441'.;Change out floor equipment, L/D 2 7/8'' cement stinger.;Clean and clear rig floor, P/U and crane BHA components to floor.;M/U BHA as per DD/MWD.;Transported to KGF G&I: Offloaded Solids = 0 bbls Cumulative Solids = 4153 bbls Daily Metal from Magnets 0 lbs. Total 355.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right Daily Losses to hole. 57 bbls total = 791.3 bbls from this event 11/6/2019 Continue M/U BHA # 14 as per DD/MWD and shallow hole test (ok);P/up rabbit strap 4" HWDP;Rih w/ drilling Bha # 14 fill pipe twice to 10, 388' right above window;orient to face 60 left and exit window and slide chasing old hole 50-350 fph w/ no hard cmt encountered t/ 10,743' and started losing returns flow dn 8% and total losses @ 10,745';slow pump t/ 115 gpm and 730 psi hole staying full w/ very little to no flow and pump 20 bbl 80PPB LCM pill and spot around corner dn pump w/ 105 bbls lost;Pooh on elevators through window and into csg @ 10,362';monitor well on trip tank while waiting on orders f/ town, Build and pump slug;POOH on elevators f/ 10,362' t/ 1633' L/D all HWDP;L/D Remaining BHA, Download MWD, L/D smart tools break bit L/D Motor, L/D drill collars from derrick;Transported to KGF G&I: Offloaded Solids = 0 bbls Cumulative Solids = 4153 bbls Daily Metal from Magnets 0 lbs. Total 355.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right Daily Losses to hole. 133 bbls total = 924.3 bbls from this event 11/7/2019 Continue L/D bha #14, drill collars from derrick and r/dn Baker B.P.A. and equipment.;P/up M/up Halliburton 7" cmt retainer and running tool & rih w/ same t/ 10,270' w/ no issue.;Attempt to brk circ to 800 psi dn pipe with no luck chk surface equipment (ok) work pipe up dn ok, r/up and attempt reverse circ and stage pressure up to 1000 psi w/ very little to no injection discuss options with town.;Establish injection rate 2 bpm 1300 psi reverse circulating no returns up DP, swap over and pump down DP stage pumps t/ 3500 psi in 500 psi increments unable to establish circulation, discuss options w/ town, set retainer as per Halliburton and shear off retainer w/ 55k over pull, establish circ.;down drill pipe, stage pumps t/ 6 bpm 1500 psi, attempt to sting into retainer and establish injection rate, packed off set 20k down, pull out of retainer, stinger plugged pressure up on stinger to 1500 psi plug cleared, sting back into retainer stage pumps t/ 2000 psi and pressure started falling;off, establish injection rate 1 bpm 1280 psi 2 bpm 1380 psi 3 bpm 1450 psi , pullout of retainer, R/U cement head and lines, sting in and reconfirm injection rate.;PJSM on cement job, SLB pumped 2 bbls water shut in valves and PT lines to 300/3000 psi, pumped 111 bbls 350 sx 13.5ppg Class G cement, followed by 5 bbls H2O stung into retainer and squeezed all but 5 bbls cement into formation, unstung and laid remaining 5 bbls on top of retainer, Pumped 1337 stks;L/D cement head and lines and racked back 3 stands t/ 9960' retainer set @ 10327'.;Drop ball and circulate around at high rate 8 bpm 2000 psi, cement contamination on bottoms up, strip LMC and weighting material f/ mud.;Transported to KGF G&I: Offloaded Solids = 18 bbls Cumulative Solids = 4171 bbls Daily Metal from Magnets 0 lbs. Total 355.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right Daily Losses to hole. 140 bbls total = 1064.3 bbls from this event ggp pullout of retainer, R/U cement head and pp g j p pp pp pp lines, sting in and reconfirm injection rate.;PJSM on cement job, SLB pumped 2 bbls water shut in valves and PT lines to 300/3000 psi, pumped 111 bbls 350 sxgj jpp ppp 13.5ppg Class G cement, followed by 5 bbls H2O stung into retainer and squeezed all but 5 bbls cement into formation, unstung and laid remaining 5 bbls onppg y g q g g top of retainer, Pumped 1337 stks;L/D cement head and lines and racked back 3 stands t/ 9960' retainer set @ 10327'.;Drop ball and circulate around at high set cmt retainer at 10270 ft ;P/up M/up Halliburton 7" cmt retainer and running tool & rih w/ same t/ 10,270' w/ no issue 11/8/2019 Continue circ 9961' @ 251 gpm @ 1315 psi and strip LCM and weighting material f/ complete mud system w/ no losses, finish clean solids from pill pits run water and OBM lines in prep for transfer to and from GPP;Continue circ and centrifuging and striping LCM from OBM start filling pill pits w/ FIW and flushing lines w/ same and start build spacer.;Shut pipe rams Test csg on chart t/ 2849 psi > 2757 psi in 30 min bump up twice and bled air once (ok) rig/dn test equipment.;Pump 662 bbls to beam tanks on GPP, R/U to reverse circ and pump 520 bbls FIW @ 3 bpm FCP 890 psi , shut down.;Clean flow lines and fluid paths and trip tanks and sand traps clean pits, clean under rig floor and catch pan, ship remaining 1124 bbls of 8.7+ ppg OBM t/ GPP beam tank.;Transported to KGF G&I: Offloaded Solids = 144 bbls Cumulative Solids = 4315 bbls Daily Metal from Magnets 2 lbs. Total 357.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right Daily Losses to hole. 140 bbls total = 1064.3 bbls from this event 11/9/2019 Continue clean flow lines and fluid paths and trip tanks and sand traps clean pits, clean under rig floor and catch pan, shiped total to date of 1124 bbls of 8.7+ ppg OBM t/ GPP beam tank.;Continue clean flow lines and fluid paths and trip tanks and sand traps clean pits, clean under rig floor and catch pan, Have isolated pit #1 of interface and rig clean up plan to build batch obm once done w/ completion diesel clean up.;POOH L/D 24 jts. of 5'' DP leaving 44 stands in derrick, Stand back 40 stands of 4'' DP, fill slug pit w/ FIW f/ platform, Work Boat off load Eline unit and tools.;Continue POOH f/ 4370' L/D 4'' DP @ 2908'.;Transported to KGF G&I: Offloaded Solids = 0 bbls Cumulative Solids = 4315 bbls Daily Metal from Magnets 2 lbs. Total 357.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right Daily Losses to hole. bbls total = 1064.3 bbls from this event 11/10/2019 Continue cleaning shakers tanks and continued POOH ld/dn 4" DP f/ 2908' t/ Bha;Inspect clean and l/dn Halliburton running tool (ok) P/up 4-3/4" jar clean same and lay back dn. Pull wear ring prep to run 2-7/8" kill string;P/up rih w/2-7/8" mule shoe cut jt @ 22.18' and 13 full jts of 2-7/8" IBT 6.4# L-80 tbg w/ special clearance couplings and land hanger w/ TWC installed W/ mule shoe @ 491.78' rkb RILDS;Back out remove XO rack back landing stand. Clean flow box and prep for nip/dn remove stack and trolley over remove riser and set dry hole tree;Hammer up dry hole tree, Test seals and void t/ 500/5000 psi f/ 15 min, Test tree t/ 250/5000 psi f/ 5 min, Pull TWC, prep to skid rig;N/U riser and BOP stack, install bell nipple and flow line, center stack;Final Report for GP-55rd Rig Activity now on GP-53rd;Transported to KGF G&I: Offloaded Solids = 0 bbls Cumulative Solids = 0 bbls Daily Metal from Magnets 0 lbs. Total 0 lbs. Total of 1124 bbls of 8.7+ OBM pump back to GPP beam tank gg pg ;Shut pipe rams Test csg on chart t/ 2849 psi > 2757 psi in 30 min bump up twice p g()p j prep to run 2-7/8" kill string;P/up rih w/2-7/8" mule shoe cut jt @ 22.18' and 13 full jts of 2-7/8" IBT 6.4# L-80 tbg w/ ygppgp j@ special clearance couplings and land hanger w/ TWC installed W/ mule shoe @ 491.78' rkb RILDS;Back out remove X Vert. Uncert 1sd[ft]1.005.00 Start MDEnd MD[ft][ft]17.00 4842.004842.00 4973.004973.00 9742.989742.98 10395.0010395.0010756.00MDInclinationAzimuthTVDTVDSSNorthEastGrid EastGrid NorthLatitudeLongitudeDLSToolfaceBuild RateTurn RateVert SectMajor SemiMinor SemiVert SemiMinor AzimComments[ft][°][°][ft][ft][ft][ft][US ft][US ft] [°/100ft] [°][°/100ft][°/100ft][ft][ft][ft][ft][°]0.00 0.00 301.62 0.00 -132.00 0.00 0.00 263339.45 2544494.92 60°57'28.755"N 151°19'53.589"W 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.00 0.00 301.62 17.00 -115.00 0.00 0.00 263339.45 2544494.92 60°57'28.755"N 151°19'53.589"W 0.00 -58.38 0.00 0.00 0.00 100.08 100.08 10.20 0.00 42.00 0.02 301.62 42.00 -90.00 0.00 0.00 263339.45 2544494.92 60°57'28.755"N 151°19'53.589"W 0.08 0.00 0.08 -233.52 0.00 100.08 100.08 10.20 31.62 67.00 0.04 301.62 67.00 -65.00 0.01 -0.01 263339.44 2544494.93 60°57'28.755"N 151°19'53.589"W 0.08 0.00 0.08 0.00 0.00 100.08 100.08 10.20 211.62 92.00 0.06 301.62 92.00 -40.00 0.02 -0.03 263339.42 2544494.94 60°57'28.755"N 151°19'53.590"W 0.08 0.00 0.08 0.00 0.01 100.08 100.08 10.20 211.62 117.00 0.09 301.62 117.00 -15.00 0.04 -0.06 263339.39 2544494.96 60°57'28.755"N 151°19'53.590"W 0.12 0.00 0.12 0.00 0.02 100.08 100.08 10.20 31.62 142.00 0.11 301.62 142.00 10.00 0.06 -0.10 263339.35 2544494.98 60°57'28.756"N 151°19'53.591"W 0.08 0.00 0.08 0.00 0.03 100.08 100.08 10.20 211.62 167.00 0.13 301.62 167.00 35.00 0.09 -0.14 263339.31 2544495.01 60°57'28.756"N 151°19'53.592"W 0.08 0.00 0.08 0.00 0.04 100.08 100.08 10.20 31.62 192.00 0.15 301.62 192.00 60.00 0.12 -0.20 263339.26 2544495.04 60°57'28.756"N 151°19'53.593"W 0.08 0.00 0.08 0.00 0.05 100.08 100.08 10.20 211.62 217.00 0.17 301.62 217.00 85.00 0.16 -0.25 263339.20 2544495.08 60°57'28.757"N 151°19'53.594"W 0.08 0.00 0.08 0.00 0.07 100.08 100.08 10.20 211.62 242.00 0.19 301.62 242.00 110.00 0.20 -0.32 263339.13 2544495.12 60°57'28.757"N 151°19'53.595"W 0.08 0.00 0.08 0.00 0.09 100.08 100.08 10.20 31.62 267.00 0.21 301.62 267.00 135.00 0.24 -0.40 263339.06 2544495.17 60°57'28.757"N 151°19'53.597"W 0.08 71.73 0.08 0.00 0.11 100.08 100.08 10.20 31.62 292.00 0.37 340.74 292.00 160.00 0.34 -0.46 263339.00 2544495.27 60°57'28.758"N 151°19'53.598"W 0.98 -28.94 0.64 156.48 0.08 100.08 100.08 10.20 33.28 317.00 0.48 333.70 317.00 185.00 0.51 -0.53 263338.93 2544495.44 60°57'28.760"N 151°19'53.600"W 0.49 -38.79 0.44 -28.16 0.01 100.08 100.08 10.20 35.99 342.00 0.51 331.04 342.00 210.00 0.71 -0.63 263338.83 2544495.64 60°57'28.762"N 151°19'53.602"W 0.15 16.24 0.12 -10.64 -0.05 100.08 100.08 10.21 38.00 367.00 0.55 332.25 367.00 235.00 0.91 -0.74 263338.72 2544495.84 60°57'28.764"N 151°19'53.604"W 0.17 -25.41 0.16 4.84 -0.12 100.08 100.08 10.21 39.69 392.00 0.63 328.84 392.00 260.00 1.13 -0.87 263338.60 2544496.07 60°57'28.766"N 151°19'53.607"W 0.35 -105.31 0.32 -13.64 -0.19 100.08 100.08 10.2141.09 417.00 0.61 318.57 416.99 284.99 1.35 -1.03 263338.45 2544496.29 60°57'28.768"N 151°19'53.610"W 0.45 -110.31 -0.08 -41.08 -0.23 100.08 100.08 10.21 41.89 442.00 0.58 307.74 441.99 309.99 1.53 -1.22 263338.26 2544496.47 60°57'28.770"N 151°19'53.614"W 0.46 -69.60 -0.12 -43.32 -0.22 100.08 100.08 10.21221.97 467.00 0.70 289.09 466.99 334.99 1.65 -1.46 263338.02 2544496.60 60°57'28.771"N 151°19'53.619"W 0.96 -36.09 0.48 -74.60 -0.14 100.08 100.08 10.21221.21 492.00 0.88 280.94 491.99 359.99 1.74 -1.80 263337.69 2544496.70 60°57'28.772"N 151°19'53.625"W 0.85 -53.92 0.72 -32.60 0.03 100.08 100.08 10.21 219.84 517.00 1.12 266.44 516.98 384.98 1.76 -2.23 263337.26 2544496.73 60°57'28.772"N 151°19'53.634"W 1.39 -52.45 0.96 -58.00 0.32 100.08 100.08 10.21 218.10 542.00 1.27 258.35 541.98 409.98 1.69 -2.74 263336.74 2544496.67 60°57'28.772"N 151°19'53.644"W 0.90 -36.62 0.60 -32.36 0.74 100.08 100.08 10.22 216.06 567.00 1.37 255.30 566.97 434.97 1.56 -3.30 263336.18 2544496.55 60°57'28.770"N 151°19'53.656"W 0.49 -50.17 0.40 -12.20 1.23 100.08 100.08 10.22 213.97 592.00 1.47 250.83 591.96 459.96 1.38 -3.90 263335.58 2544496.38 60°57'28.769"N 151°19'53.668"W 0.60 -76.13 0.40 -17.88 1.77 100.08 100.08 10.22 211.89 617.00 1.53 243.57 616.96 484.96 1.12 -4.50 263334.98 2544496.14 60°57'28.766"N 151°19'53.680"W 0.80 -50.07 0.24 -29.04 2.38 100.08 100.08 10.22 209.77 642.00 1.58 241.45 641.95 509.95 0.81 -5.10 263334.37 2544495.83 60°57'28.763"N 151°19'53.692"W 0.30 -81.94 0.20 -8.48 3.02 100.08 100.08 10.22 207.63 667.00 1.61 235.84 666.94 534.94 0.45 -5.69 263333.77 2544495.48 60°57'28.759"N 151°19'53.704"W 0.64 -63.49 0.12 -22.44 3.70 100.08 100.08 10.23 205.51 692.00 1.64 233.81 691.93 559.93 0.04 -6.27 263333.18 2544495.09 60°57'28.755"N 151°19'53.716"W 0.26 -129.05 0.12 -8.12 4.40 100.08 100.08 10.23 203.40 717.00 1.53 228.41 716.92 584.92 -0.39 -6.81 263332.63 2544494.67 60°57'28.751"N 151°19'53.727"W 0.74 -148.84 -0.44 -21.60 5.08 100.08 100.08 10.23 201.30 742.00 1.33 223.04 741.91 609.91 -0.83 -7.26 263332.18 2544494.24 60°57'28.747"N 151°19'53.736"W 0.96 -136.15 -0.80 -21.48 5.71 100.08 100.08 10.23 199.17 767.00 1.07 207.45 766.90 634.90 -1.24 -7.56 263331.86 2544493.83 60°57'28.743"N 151°19'53.742"W 1.66 -119.84 -1.04 -62.36 6.22 100.08 100.08 10.23 196.96 792.00 0.94 186.73 791.90 659.90 -1.66 -7.70 263331.72 2544493.42 60°57'28.739"N 151°19'53.745"W 1.53 -103.57 -0.52 -82.88 6.60 100.08 100.08 10.24 194.68 817.00 0.92 166.48 816.90 684.90 -2.05 -7.67 263331.74 2544493.02 60°57'28.735"N 151°19'53.744"W 1.31 -78.53 -0.08 -81.00 6.87 100.08 100.08 10.24192.48 842.00 1.03 149.04 841.89 709.89 -2.44 -7.51 263331.89 2544492.63 60°57'28.731"N 151°19'53.741"W 1.26 -37.29 0.44 -69.76 7.03 100.08 100.08 10.24190.52 867.00 1.13 145.27 866.89 734.89 -2.84 -7.25 263332.14 2544492.23 60°57'28.727"N 151°19'53.736"W 0.49 -80.27 0.40 -15.08 7.13 100.08 100.08 10.24188.73 892.00 1.14 142.68 891.88 759.88 -3.24 -6.96 263332.42 2544491.82 60°57'28.723"N 151°19'53.730"W 0.21 -174.78 0.04 -10.36 7.21 100.08 100.08 10.25186.92 917.00 1.09 142.44 916.88 784.88 -3.62 -6.67 263332.71 2544491.43 60°57'28.719"N 151°19'53.724"W 0.20 -77.66 -0.20 -0.96 7.27 100.08 100.08 10.25185.04 942.00 1.12 136.72 941.88 809.88 -3.99 -6.35 263333.02 2544491.06 60°57'28.716"N 151°19'53.718"W 0.46 -21.10 0.12 -22.88 7.31 100.08 100.08 10.25183.14 967.00 1.18 135.60 966.87 834.87 -4.35 -6.01 263333.36 2544490.69 60°57'28.712"N 151°19'53.711"W 0.26 139.82 0.24 -4.48 7.32 100.08 100.08 10.26 181.22 992.00 1.14 137.32 991.87 859.87 -4.72 -5.66 263333.70 2544490.32 60°57'28.709"N 151°19'53.703"W 0.21 -123.45 -0.16 6.88 7.34 100.08 100.08 10.26179.16 1017.00 1.10 134.02 1016.86 884.86 -5.07 -5.32 263334.03 2544489.96 60°57'28.705"N 151°19'53.697"W 0.30 -31.84 -0.16 -13.20 7.34 100.08 100.08 10.26 176.97 1042.00 1.13 133.08 1041.86 909.86 -5.40 -4.96 263334.38 2544489.62 60°57'28.702"N 151°19'53.689"W 0.14 130.44 0.12 -3.76 7.33 100.08 100.08 10.27 174.70 1067.00 1.10 134.95 1066.85 934.85 -5.74 -4.61 263334.72 2544489.27 60°57'28.698"N 151°19'53.682"W 0.19 173.41 -0.12 7.48 7.32 100.08 100.08 10.27 172.25 1092.00 1.06 135.20 1091.85 959.85 -6.08 -4.28 263335.05 2544488.93 60°57'28.695"N 151°19'53.676"W 0.16 24.59 -0.16 1.00 7.33 100.08 100.08 10.27169.58 1117.001.10136.151116.84984.84-6.41-3.95263335.372544488.5960°57'28.692"N151°19'53.669"W0.18170.120.163.807.33100.08100.0810.28166.72 OperatorHilcorp Alaska, LLCNorth ReferenceTrueAreaCook Inlet, Alaska (Offshore)Scale0.999964Actual Wellpath Geographic Report - including Position UncertaintyReport by Baker Hughes11/20/2019 at 12:27 using WellArchitect 5.1Projection SystemNAD27 / TM Alaska SP, Zone 4 (5004), US feetSlotslot #4-06Vertical Reference PointActual RKB = 132.00' (RKB)WellGP55RDMD Reference PointActual RKB = 132.00' (RKB)FieldGranite Point FieldConvergence at Slot1.16 WestFacilityGRANITE POINT PlatformHorizontal Reference PointSlotWellbore Last Revised11/20/2019Actual RKB = 132.00' (RKB) to mean sea level132.00 ftSidetrack fromGP55RD PB2_awp at 10395.00 MDActual RKB = 132.00' (RKB) to Mud Line at Slot (slot #4-06)132.00 ftWellboreGP55RDField Vertical Referencemean sea levelWellpathGP55RD_awpActual RKB = 132.00' (RKB) to Facility Vertical Datum132.00 ftDeclinationMagnetic North is 15.56 degrees East of True NorthSection Azimuth224.88°Ellipse Confidence Limit2.00 Std DevSurface Position UncertaintyincludedUserUlricardSection Origin XE 0.00 ftCalculation methodMinimum curvatureSection Origin YN 0.00 ftDatabaseWA_ANC_DefnEllipse Start MD17.00 ftLocal North Local East Grid East Grid North Latitude Longitude Horiz. Uncert 1sd[ft] [ft] [US ft] [US ft] [ft]151°19'53.589"W 2.00Facility Reference Pt 262081.75 2546957.3360°57'52.746"N 151°20'20.074"W 50.00Slot Location-2436.29 1307.80263339.45 2544494.9260°57'28.755"N SDI Keeper v1.04 SDI Gyro <0-4842> GP55151°18'33.112"W Positional Uncertainty Model Log Name / Comment WellboreField Reference Pt 267571.89 2557407.9860°59'36.731"NBHI OnTrak (MagCAD+IFR1, SAG) BHI OnTrak (MagCad+IFR,Sag) <9813-10717> GP55RD PB2BHI OnTrak (MagCAD+IFR1, SAG) OnTrak(MagCad+IFR,Sag)<10395-110756> GP55RDBHI MTC (Collar, pre-2000) (Standard) MWD <1594-5011'> GP55BHI Unknown Tool (Standard) BHI Ontrak (MagCad+IFR,Sag) <5023-10347> GP-55RD PB1Page 1 of 4 1142.00 1.07 136.43 1141.84 1009.84 -6.75 -3.63 263335.69 2544488.24 60°57'28.689"N 151°19'53.662"W 0.12 -52.71 -0.12 1.12 7.34 100.08 100.08 10.28 163.65 1167.00 1.21 128.43 1166.83 1034.83 -7.09 -3.26 263336.05 2544487.90 60°57'28.685"N 151°19'53.655"W 0.85 164.83 0.56 -32.00 7.32 100.08 100.08 10.28 160.51 1192.00 1.10 129.99 1191.83 1059.83 -7.41 -2.87 263336.43 2544487.57 60°57'28.682"N 151°19'53.647"W 0.46 78.33 -0.44 6.24 7.27 100.08 100.08 10.29157.28 1217.00 1.11 132.27 1216.82 1084.82 -7.72 -2.50 263336.79 2544487.25 60°57'28.679"N 151°19'53.640"W 0.18 113.69 0.04 9.12 7.24 100.08 100.08 10.29153.78 1242.00 1.07 137.76 1241.82 1109.82 -8.06 -2.17 263337.12 2544486.91 60°57'28.676"N 151°19'53.633"W 0.45 -32.90 -0.16 21.96 7.24 100.08 100.08 10.30 150.02 1267.00 1.12 136.12 1266.81 1134.81 -8.41 -1.84 263337.44 2544486.55 60°57'28.672"N 151°19'53.626"W 0.24 11.17 0.20 -6.56 7.26 100.08 100.08 10.30146.09 1292.00 1.23 137.13 1291.81 1159.81 -8.78 -1.49 263337.78 2544486.17 60°57'28.669"N 151°19'53.619"W 0.45 -158.26 0.44 4.04 7.27 100.08 100.08 10.30 142.08 1317.00 1.19 136.36 1316.80 1184.80 -9.17 -1.13 263338.14 2544485.78 60°57'28.665"N 151°19'53.612"W 0.17 -18.74 -0.16 -3.08 7.29 100.08 100.08 10.31 138.02 1342.00 1.29 134.86 1341.80 1209.80 -9.55 -0.75 263338.51 2544485.39 60°57'28.661"N 151°19'53.604"W 0.42 -149.84 0.40 -6.00 7.30 100.08 100.08 10.31 133.95 1367.00 1.22 132.93 1366.79 1234.79 -9.93 -0.35 263338.89 2544485.00 60°57'28.657"N 151°19'53.596"W 0.33 -167.02 -0.28 -7.72 7.29 100.09 100.08 10.32 129.88 1392.00 1.03 130.48 1391.79 1259.79 -10.26 0.01 263339.25 2544484.66 60°57'28.654"N 151°19'53.589"W 0.78 73.91 -0.76 -9.80 7.26 100.09 100.08 10.32 125.83 1417.00 1.05 133.91 1416.78 1284.78 -10.56 0.35 263339.58 2544484.35 60°57'28.651"N 151°19'53.582"W 0.26 -51.93 0.08 13.72 7.24 100.09 100.08 10.33 121.85 1442.00 1.09 131.30 1441.78 1309.78 -10.88 0.69 263339.92 2544484.03 60°57'28.648"N 151°19'53.575"W 0.25 -93.23 0.16 -10.44 7.22 100.09 100.08 10.33 117.97 1467.00 1.09 124.83 1466.77 1334.77 -11.17 1.06 263340.29 2544483.73 60°57'28.645"N 151°19'53.567"W 0.49 128.15 0.00 -25.88 7.16 100.09 100.09 10.33 114.14 1492.00 1.00 131.98 1491.77 1359.77 -11.45 1.42 263340.64 2544483.44 60°57'28.642"N 151°19'53.560"W 0.63 91.14 -0.36 28.60 7.11 100.09 100.09 10.34 110.44 1517.00 1.01 141.27 1516.77 1384.77 -11.77 1.72 263340.93 2544483.12 60°57'28.639"N 151°19'53.554"W 0.65 51.65 0.04 37.16 7.13 100.09 100.09 10.34107.12 1542.00 1.44 159.55 1541.76 1409.76 -12.24 1.97 263341.17 2544482.65 60°57'28.635"N 151°19'53.549"W 2.30 53.04 1.72 73.12 7.28 100.09 100.09 10.35104.58 1567.00 2.58 186.11 1566.74 1434.74 -13.09 2.02 263341.20 2544481.79 60°57'28.626"N 151°19'53.548"W 5.77 22.65 4.56 106.24 7.85 100.09 100.09 10.35 103.38 1592.00 3.81 193.65 1591.71 1459.71 -14.46 1.76 263340.92 2544480.43 60°57'28.613"N 151°19'53.553"W 5.19 14.97 4.92 30.16 9.00 100.09 100.09 10.36283.19 1617.00 4.55 196.13 1616.64 1484.64 -16.22 1.29 263340.41 2544478.68 60°57'28.595"N 151°19'53.563"W 3.05 12.52 2.96 9.92 10.58 100.09 100.09 10.37283.27 1642.00 5.22 197.76 1641.55 1509.55 -18.25 0.67 263339.75 2544476.66 60°57'28.575"N 151°19'53.575"W 2.74 33.19 2.68 6.52 12.46 100.09 100.09 10.37283.44 1667.00 5.45 199.33 1666.44 1534.44 -20.46 -0.07 263338.96 2544474.47 60°57'28.554"N 151°19'53.590"W 1.09 40.56 0.92 6.28 14.54 100.09 100.09 10.38 283.66 1692.00 5.52 199.95 1691.32 1559.32 -22.71 -0.87 263338.12 2544472.24 60°57'28.531"N 151°19'53.607"W 0.37 16.79 0.28 2.48 16.71 100.09 100.09 10.38 283.91 1717.00 5.87 200.98 1716.20 1584.20 -25.03 -1.74 263337.20 2544469.93 60°57'28.509"N 151°19'53.624"W 1.46 25.05 1.40 4.12 18.97 100.09 100.09 10.39 284.16 1742.00 6.45 203.37 1741.06 1609.06 -27.51 -2.76 263336.14 2544467.47 60°57'28.484"N 151°19'53.645"W 2.54 27.58 2.32 9.56 21.44 100.09 100.09 10.39 284.45 1767.00 7.21 206.49 1765.88 1633.88 -30.21 -4.01 263334.82 2544464.80 60°57'28.458"N 151°19'53.670"W 3.38 20.24 3.04 12.48 24.24 100.09 100.09 10.40 284.81 1792.00 8.20 209.03 1790.65 1658.65 -33.17 -5.58 263333.20 2544461.87 60°57'28.428"N 151°19'53.702"W 4.19 10.79 3.96 10.16 27.44 100.09 100.09 10.40 285.22 1817.00 9.07 210.08 1815.37 1683.37 -36.43 -7.43 263331.28 2544458.65 60°57'28.396"N 151°19'53.739"W 3.54 11.84 3.48 4.20 31.06 100.09 100.09 10.41 285.63 1842.00 10.12 211.33 1840.02 1708.02 -40.02 -9.56 263329.08 2544455.11 60°57'28.361"N 151°19'53.783"W 4.28 12.24 4.20 5.00 35.10 100.09 100.09 10.42 286.02 1867.00 11.44 212.77 1864.58 1732.58 -43.98 -12.04 263326.51 2544451.20 60°57'28.322"N 151°19'53.833"W 5.39 3.52 5.28 5.76 39.66 100.09 100.09 10.42 286.38 1892.00 12.69 213.12 1889.03 1757.03 -48.36 -14.89 263323.58 2544446.87 60°57'28.279"N 151°19'53.890"W 5.01 -2.50 5.00 1.40 44.77 100.09 100.09 10.43 286.69 1917.00 13.84 212.91 1913.36 1781.36 -53.17 -18.01 263320.36 2544442.13 60°57'28.231"N 151°19'53.954"W 4.60 -5.31 4.60 -0.84 50.39 100.09 100.0910.44 286.92 1942.00 14.92 212.52 1937.57 1805.57 -58.40 -21.37 263316.90 2544436.97 60°57'28.180"N 151°19'54.022"W 4.34 -4.71 4.32 -1.56 56.46 100.09 100.0910.44 287.08 1967.00 15.64 212.30 1961.69 1829.69 -63.96 -24.90 263313.26 2544431.48 60°57'28.125"N 151°19'54.093"W 2.89 -8.35 2.88 -0.88 62.89 100.09 100.0910.45 287.16 1992.00 16.31 211.95 1985.72 1853.72 -69.79 -28.56 263309.48 2544425.73 60°57'28.068"N 151°19'54.167"W 2.71 0.00 2.68 -1.40 69.60 100.09 100.09 10.46 287.18 2017.00 16.61 211.95 2009.70 1877.70 -75.80 -32.31 263305.61 2544419.80 60°57'28.009"N 151°19'54.243"W 1.20 8.16 1.20 0.00 76.50 100.09 100.09 10.46 287.14 2042.00 17.06 212.17 2033.63 1901.63 -81.93 -36.15 263301.65 2544413.74 60°57'27.948"N 151°19'54.321"W 1.82 10.34 1.80 0.88 83.56 100.09 100.09 10.47 287.04 2067.00 17.85 212.64 2057.48 1925.48 -88.26 -40.17 263297.50 2544407.50 60°57'27.886"N 151°19'54.402"W 3.21 -7.24 3.16 1.88 90.88 100.09 100.09 10.48 286.87 2092.00 18.63 212.33 2081.22 1949.22 -94.86 -44.37 263293.16 2544400.98 60°57'27.821"N 151°19'54.487"W 3.14 4.79 3.12 -1.24 98.53 100.10 100.09 10.48 286.61 2117.00 19.26 212.49 2104.87 1972.87 -101.72 -48.72 263288.68 2544394.22 60°57'27.753"N 151°19'54.576"W 2.53 11.45 2.52 0.64 106.45 100.10 100.09 10.49 286.25 2142.00 19.83 212.83 2128.43 1996.43 -108.76 -53.23 263284.02 2544387.27 60°57'27.684"N 151°19'54.667"W 2.32 4.64 2.28 1.36 114.63 100.10 100.0910.50 285.78 2167.00 20.61 213.01 2151.89 2019.89 -116.01 -57.93 263279.18 2544380.12 60°57'27.613"N 151°19'54.762"W 3.13 6.77 3.12 0.72 123.08 100.10 100.0910.50 285.16 2192.00 21.41 213.27 2175.22 2043.22 -123.51 -62.83 263274.13 2544372.71 60°57'27.539"N 151°19'54.861"W 3.22 3.51 3.20 1.04 131.85 100.10 100.0910.51 284.36 2217.00 22.60 213.46 2198.40 2066.40 -131.34 -67.98 263268.82 2544365.00 60°57'27.462"N 151°19'54.966"W 4.77 3.31 4.76 0.76 141.03 100.10 100.0910.52 283.29 2242.00 23.86 213.64 2221.37 2089.37 -139.55 -73.43 263263.20 2544356.89 60°57'27.381"N 151°19'55.076"W 5.05 4.63 5.04 0.72 150.70 100.10 100.1010.53 281.84 2267.00 25.01 213.86 2244.13 2112.13 -148.15 -79.18 263257.28 2544348.41 60°57'27.296"N 151°19'55.192"W 4.61 4.25 4.60 0.88 160.85 100.10 100.1010.53 279.89 2292.00 26.20 214.06 2266.68 2134.68 -157.11 -85.21 263251.07 2544339.58 60°57'27.208"N 151°19'55.315"W 4.77 -4.81 4.76 0.80 171.46 100.10 100.10 10.54 277.23 2317.00 27.01 213.91 2289.03 2157.03 -166.40 -91.47 263244.62 2544330.42 60°57'27.116"N 151°19'55.441"W 3.25 -2.74 3.24 -0.60 182.45 100.10 100.10 10.55 273.64 2342.00 27.59 213.85 2311.25 2179.25 -175.92 -97.86 263238.04 2544321.03 60°57'27.023"N 151°19'55.571"W 2.32 5.71 2.32 -0.24 193.71 100.10 100.10 10.56 268.94 2367.00 28.35 214.01 2333.33 2201.33 -185.65 -104.41 263231.30 2544311.44 60°57'26.927"N 151°19'55.703"W 3.05 18.54 3.04 0.64 205.22 100.10 100.10 10.56 262.98 2392.00 29.15 214.56 2355.24 2223.24 -195.58 -111.18 263224.32 2544301.65 60°57'26.829"N 151°19'55.841"W 3.37 -10.84 3.20 2.20 217.04 100.10 100.10 10.57 255.95 2417.00 29.72 214.34 2377.02 2245.02 -205.71 -118.13 263217.17 2544291.66 60°57'26.729"N 151°19'55.981"W 2.32 -4.01 2.28 -0.88 229.12 100.10 100.10 10.58 248.66 2442.00 30.37 214.25 2398.66 2266.66 -216.05 -125.18 263209.91 2544281.46 60°57'26.628"N 151°19'56.124"W 2.61 -22.29 2.60 -0.36 241.42 100.11 100.10 10.59 242.04 2467.00 31.18 213.61 2420.14 2288.14 -226.67 -132.32 263202.55 2544271.00 60°57'26.523"N 151°19'56.269"W 3.49 -22.89 3.24 -2.56 253.98 100.11 100.10 10.60 236.55 2492.00 32.14 212.85 2441.42 2309.42 -237.64 -139.51 263195.14 2544260.17 60°57'26.415"N 151°19'56.414"W 4.16 -11.29 3.84 -3.04 266.83 100.11 100.10 10.60 232.17 2517.00 32.93 212.56 2462.49 2330.49 -248.96 -146.78 263187.65 2544249.01 60°57'26.303"N 151°19'56.561"W 3.22 -24.48 3.16 -1.16 279.98 100.11 100.10 10.61 228.73 2542.00 33.39 212.18 2483.42 2351.42 -260.51 -154.10 263180.10 2544237.61 60°57'26.190"N 151°19'56.710"W 2.02 -12.17 1.84 -1.52 293.33 100.11 100.11 10.62 226.08 2567.00 34.44 211.78 2504.17 2372.17 -272.34 -161.49 263172.47 2544225.93 60°57'26.073"N 151°19'56.859"W 4.29 -6.70 4.20 -1.60 306.92 100.11 100.11 10.63 223.98 2592.00 35.58 211.55 2524.64 2392.64 -284.55 -169.01 263164.70 2544213.88 60°57'25.953"N 151°19'57.012"W 4.59 -12.26 4.56 -0.92 320.88 100.11 100.11 10.64 222.27 2617.00 36.40 211.25 2544.87 2412.87 -297.09 -176.67 263156.79 2544201.50 60°57'25.830"N 151°19'57.167"W 3.35 -22.22 3.28 -1.20 335.17 100.12 100.11 10.65 220.87 2642.00 37.08 210.79 2564.91 2432.91 -309.90 -184.37 263148.82 2544188.84 60°57'25.703"N 151°19'57.323"W 2.93 -24.80 2.72 -1.84 349.69 100.12 100.11 10.65 219.70 2667.00 38.18 209.97 2584.71 2452.71 -323.07 -192.09 263140.84 2544175.83 60°57'25.574"N 151°19'57.479"W 4.83 -21.03 4.40 -3.28 364.47 100.12 100.11 10.66 218.69 2692.00 39.37 209.25 2604.20 2472.20 -336.68 -199.83 263132.83 2544162.38 60°57'25.440"N 151°19'57.636"W 5.09 -11.08 4.76 -2.88 379.57 100.12 100.11 10.67 217.79 2717.00 40.60 208.88 2623.35 2491.35 -350.72 -207.63 263124.74 2544148.50 60°57'25.301"N 151°19'57.794"W 5.01 3.04 4.92 -1.48 395.02 100.13 100.11 10.68 216.98 2742.00 41.73 208.97 2642.17 2510.17 -365.13 -215.59 263116.49 2544134.26 60°57'25.160"N 151°19'57.955"W 4.53 13.11 4.52 0.36 410.85 100.13 100.11 10.69 216.28 2767.00 42.87 209.36 2660.66 2528.66 -379.82 -223.79 263108.00 2544119.74 60°57'25.015"N 151°19'58.121"W 4.68 13.58 4.56 1.56 427.04 100.13 100.11 10.70 215.68 2792.00 44.11 209.79 2678.80 2546.80 -394.78 -232.28 263099.20 2544104.95 60°57'24.868"N 151°19'58.293"W 5.10 18.38 4.96 1.72 443.64 100.14 100.11 10.71 215.18 2817.00 44.94 210.18 2696.62 2564.62 -409.97 -241.04 263090.14 2544089.95 60°57'24.718"N 151°19'58.470"W 3.50 20.54 3.32 1.56 460.58 100.14 100.11 10.72 214.76 2842.00 45.55 210.50 2714.22 2582.22 -425.29 -250.01 263080.86 2544074.82 60°57'24.567"N 151°19'58.652"W 2.60 10.17 2.44 1.28 477.76 100.14 100.11 10.73 214.41 2867.00 46.81 210.81 2731.53 2599.53 -440.80 -259.21 263071.35 2544059.49 60°57'24.414"N 151°19'58.838"W 5.12 4.99 5.04 1.24 495.25 100.15 100.12 10.73 214.12 2892.00 48.09 210.96 2748.44 2616.44 -456.61 -268.66 263061.58 2544043.88 60°57'24.259"N 151°19'59.030"W 5.14 2.15 5.12 0.60 513.12 100.15 100.12 10.74 213.87 2917.00 48.69 210.99 2765.04 2633.04 -472.63 -278.28 263051.63 2544028.05 60°57'24.101"N 151°19'59.224"W 2.40 39.27 2.40 0.12 531.26 100.15 100.12 10.75 213.65 2942.00 48.93 211.25 2781.50 2649.50 -488.74 -288.01 263041.59 2544012.15 60°57'23.942"N 151°19'59.421"W 1.24 -9.22 0.96 1.04 549.54 100.16 100.12 10.76 213.47 2967.00 49.21 211.19 2797.88 2665.88 -504.89 -297.80 263031.47 2543996.20 60°57'23.783"N 151°19'59.620"W 1.13 152.39 1.12 -0.24 567.89 100.16 100.12 10.77 213.31 2992.00 49.08 211.28 2814.24 2682.24 -521.06 -307.60 263021.34 2543980.24 60°57'23.624"N 151°19'59.818"W 0.59 -142.95 -0.52 0.36 586.26 100.17 100.12 10.78 213.17 3017.00 49.04 211.24 2830.62 2698.62 -537.20 -317.40 263011.21 2543964.30 60°57'23.465"N 151°20'00.017"W 0.20 11.41 -0.16 -0.16 604.62 100.17 100.12 10.79 213.04 3042.00 49.19 211.28 2846.98 2714.98 -553.36 -327.21 263001.08 2543948.34 60°57'23.306"N 151°20'00.215"W 0.61 0.00 0.60 0.16 622.99 100.18 100.12 10.80 212.93 3067.00 49.31 211.28 2863.30 2731.30 -569.55 -337.04 262990.92 2543932.36 60°57'23.147"N 151°20'00.414"W 0.48 33.05 0.48 0.00 641.39 100.18 100.12 10.81 212.84 3092.00 49.38 211.34 2879.59 2747.59 -585.75 -346.90 262980.74 2543916.36 60°57'22.987"N 151°20'00.614"W 0.33 -84.33 0.28 0.24 659.83 100.19 100.12 10.82 212.75 3117.00 49.43 210.70 2895.86 2763.86 -602.02 -356.68 262970.63 2543900.29 60°57'22.827"N 151°20'00.812"W 1.95 -91.16 0.20 -2.56 678.26 100.19 100.12 10.84 212.66 3142.00 49.42 209.85 2912.12 2780.12 -618.42 -366.25 262960.72 2543884.09 60°57'22.665"N 151°20'01.006"W 2.58 -44.89 -0.04 -3.40 696.64 100.20 100.13 10.85 212.55 3167.00 49.82 209.33 2928.31 2796.31 -634.98 -375.66 262950.98 2543867.73 60°57'22.502"N 151°20'01.196"W 2.25 14.32 1.60 -2.08 715.01 100.20 100.13 10.86 212.43 3192.00 49.97 209.38 2944.42 2812.42 -651.64 -385.03 262941.27 2543851.26 60°57'22.338"N 151°20'01.386"W 0.62 160.23 0.60 0.20 733.43 100.21 100.13 10.87 212.32 3217.00 49.80 209.46 2960.53 2828.53 -668.30 -394.42 262931.55 2543834.80 60°57'22.174"N 151°20'01.576"W 0.72 -153.14 -0.68 0.32 751.86 100.22 100.13 10.88 212.21 3242.00 49.47 209.24 2976.72 2844.72 -684.90 -403.76 262921.87 2543818.39 60°57'22.011"N 151°20'01.765"W 1.48 61.32 -1.32 -0.88 770.21 100.22 100.13 10.89 212.11 3267.00 49.52 209.36 2992.95 2860.95 -701.48 -413.06 262912.24 2543802.01 60°57'21.847"N 151°20'01.954"W 0.42 -53.15 0.20 0.48 788.52 100.23 100.13 10.91 212.01 3292.0049.60209.223009.172877.17-718.07-422.37262902.592543785.6060°57'21.684"N151°20'02.142"W0.53108.250.32-0.56806.85100.23100.1310.92211.92 Page 2 of 4 3317.00 49.55 209.42 3025.38 2893.38 -734.67 -431.69 262892.94 2543769.20 60°57'21.521"N 151°20'02.331"W 0.64 129.43 -0.20 0.80 825.18 100.24 100.13 10.93 211.84 3342.00 49.50 209.50 3041.61 2909.61 -751.22 -441.04 262883.25 2543752.84 60°57'21.357"N 151°20'02.520"W 0.32 180.00 -0.20 0.32 843.51 100.25 100.13 10.94 211.77 3367.00 49.41 209.50 3057.86 2925.86 -767.76 -450.40 262873.56 2543736.50 60°57'21.195"N 151°20'02.710"W 0.36 110.64 -0.36 0.00 861.83 100.25 100.14 10.96 211.70 3392.00 49.39 209.57 3074.13 2942.13 -784.27 -459.75 262863.87 2543720.18 60°57'21.032"N 151°20'02.899"W 0.23 167.27 -0.08 0.28 880.13 100.26 100.14 10.97 211.63 3417.00 48.89 209.72 3090.49 2958.49 -800.71 -469.11 262854.19 2543703.94 60°57'20.870"N 151°20'03.089"W 2.05 144.34 -2.00 0.60 898.38 100.27 100.14 10.98 211.58 3442.00 48.66 209.94 3106.96 2974.96 -817.02 -478.46 262844.51 2543687.82 60°57'20.710"N 151°20'03.278"W 1.13 162.87 -0.92 0.88 916.54 100.28 100.14 11.00 211.53 3467.00 48.49 210.01 3123.50 2991.50 -833.26 -487.83 262834.81 2543671.78 60°57'20.550"N 151°20'03.468"W 0.71 23.51 -0.68 0.28 934.65 100.28 100.14 11.01 211.48 3492.00 48.68 210.12 3140.04 3008.04 -849.48 -497.22 262825.09 2543655.75 60°57'20.390"N 151°20'03.658"W 0.83 10.32 0.76 0.44 952.78 100.29 100.14 11.02 211.45 3517.00 48.97 210.19 3156.50 3024.50 -865.75 -506.67 262815.31 2543639.67 60°57'20.230"N 151°20'03.849"W 1.18 153.32 1.16 0.28 970.98 100.30 100.14 11.04 211.41 3542.00 48.91 210.23 3172.92 3040.92 -882.04 -516.16 262805.50 2543623.58 60°57'20.069"N 151°20'04.041"W 0.27 56.52 -0.24 0.16 989.21 100.31 100.14 11.05 211.38 3567.00 49.00 210.41 3189.34 3057.34 -898.32 -525.67 262795.65 2543607.50 60°57'19.909"N 151°20'04.234"W 0.65 9.55 0.36 0.72 1007.46 100.31 100.15 11.06 211.35 3592.00 49.18 210.45 3205.71 3073.71 -914.61 -535.24 262785.75 2543591.41 60°57'19.749"N 151°20'04.428"W 0.73 1.25 0.72 0.16 1025.76 100.32 100.15 11.08 211.32 3617.00 49.53 210.46 3221.99 3089.99 -930.96 -544.86 262775.81 2543575.25 60°57'19.588"N 151°20'04.623"W 1.40 -16.71 1.40 0.04 1044.13 100.33 100.15 11.09 211.30 3642.00 49.81 210.35 3238.17 3106.17 -947.40 -554.50 262765.83 2543559.02 60°57'19.426"N 151°20'04.818"W 1.17 0.00 1.12 -0.44 1062.58 100.34 100.15 11.11 211.28 3667.00 49.81 210.35 3254.31 3122.31 -963.88 -564.15 262755.85 2543542.74 60°57'19.263"N 151°20'05.013"W 0.00 123.28 0.00 0.00 1081.07 100.35 100.15 11.12 211.25 3692.00 49.72 210.53 3270.45 3138.45 -980.34 -573.82 262745.85 2543526.48 60°57'19.101"N 151°20'05.209"W 0.66 174.45 -0.36 0.72 1099.55 100.36 100.15 11.14 211.23 3717.00 49.33 210.58 3286.68 3154.68 -996.71 -583.49 262735.85 2543510.31 60°57'18.940"N 151°20'05.405"W 1.57 -148.80 -1.56 0.20 1117.97 100.37100.15 11.15 211.21 3742.00 49.23 210.50 3302.99 3170.99 -1013.03 -593.12 262725.89 2543494.19 60°57'18.779"N 151°20'05.600"W 0.47 167.07 -0.40 -0.32 1136.33 100.37 100.16 11.17 211.20 3767.00 49.00 210.57 3319.35 3187.35 -1029.31 -602.72 262715.96 2543478.11 60°57'18.619"N 151°20'05.794"W 0.94 41.13 -0.92 0.28 1154.64 100.38 100.16 11.19 211.18 3792.00 49.13 210.72 3335.73 3203.73 -1045.56 -612.35 262706.01 2543462.06 60°57'18.459"N 151°20'05.989"W 0.69 9.16 0.52 0.60 1172.95 100.39 100.16 11.20 211.17 3817.00 49.46 210.79 3352.04 3220.04 -1061.85 -622.04 262695.99 2543445.97 60°57'18.299"N 151°20'06.185"W 1.34 41.32 1.32 0.28 1191.33 100.40 100.16 11.22 211.16 3842.00 49.59 210.94 3368.27 3236.27 -1078.17 -631.80 262685.90 2543429.85 60°57'18.138"N 151°20'06.383"W 0.69 -29.82 0.52 0.60 1209.78 100.41 100.16 11.23 211.15 3867.00 49.79 210.79 3384.44 3252.44 -1094.53 -641.58 262675.79 2543413.69 60°57'17.977"N 151°20'06.581"W 0.92 42.93 0.80 -0.60 1228.28 100.42 100.16 11.25 211.14 3892.00 49.93 210.96 3400.56 3268.56 -1110.94 -651.38 262665.66 2543397.49 60°57'17.815"N 151°20'06.780"W 0.76 -3.66 0.56 0.68 1246.82 100.43 100.16 11.27 211.13 3917.00 50.05 210.95 3416.63 3284.63 -1127.36 -661.23 262655.47 2543381.27 60°57'17.654"N 151°20'06.979"W 0.48 -86.51 0.48 -0.04 1265.40 100.44100.17 11.28 211.12 3942.00 50.06 210.74 3432.68 3300.68 -1143.81 -671.06 262645.32 2543365.02 60°57'17.491"N 151°20'07.178"W 0.65 0.00 0.04 -0.84 1284.00 100.45 100.17 11.30 211.12 3967.00 50.06 210.74 3448.73 3316.73 -1160.29 -680.86 262635.19 2543348.75 60°57'17.329"N 151°20'07.376"W 0.00 17.75 0.00 0.00 1302.59 100.46 100.17 11.32 211.11 3992.00 50.18 210.79 3464.76 3332.76 -1176.77 -690.67 262625.04 2543332.47 60°57'17.167"N 151°20'07.575"W 0.50 -60.89 0.48 0.20 1321.19 100.48 100.17 11.33 211.10 4017.00 50.24 210.65 3480.76 3348.76 -1193.29 -700.48 262614.89 2543316.16 60°57'17.004"N 151°20'07.774"W 0.49 -28.80 0.24 -0.56 1339.82 100.49100.17 11.35 211.09 4042.00 50.31 210.60 3496.74 3364.74 -1209.83 -710.28 262604.77 2543299.81 60°57'16.841"N 151°20'07.972"W 0.32 69.66 0.28 -0.20 1358.45 100.50 100.17 11.37 211.08 4067.00 50.33 210.67 3512.70 3380.70 -1226.39 -720.08 262594.63 2543283.46 60°57'16.678"N 151°20'08.171"W 0.23 -57.00 0.08 0.28 1377.10 100.51 100.18 11.39 211.07 4092.00 50.34 210.65 3528.66 3396.66 -1242.94 -729.90 262584.48 2543267.11 60°57'16.515"N 151°20'08.369"W 0.07 -155.23 0.04 -0.08 1395.76 100.52 100.18 11.41 211.06 4117.00 50.29 210.62 3544.62 3412.62 -1259.50 -739.70 262574.34 2543250.76 60°57'16.352"N 151°20'08.568"W 0.22 -66.58 -0.20 -0.12 1414.40 100.53 100.18 11.42 211.05 4142.00 50.30 210.59 3560.59 3428.59 -1276.05 -749.49 262564.22 2543234.41 60°57'16.189"N 151°20'08.766"W 0.10 -23.76 0.04 -0.12 1433.04 100.54100.18 11.44 211.05 4167.00 50.37 210.55 3576.55 3444.55 -1292.62 -759.28 262554.09 2543218.04 60°57'16.026"N 151°20'08.964"W 0.31 -24.84 0.28 -0.16 1451.69 100.56100.18 11.46 211.04 4192.00 50.47 210.49 3592.48 3460.48 -1309.22 -769.07 262543.97 2543201.65 60°57'15.863"N 151°20'09.162"W 0.44 -47.23 0.40 -0.24 1470.36 100.57100.18 11.48 211.03 4217.00 50.52 210.42 3608.38 3476.38 -1325.85 -778.84 262533.86 2543185.22 60°57'15.699"N 151°20'09.360"W 0.29 153.43 0.20 -0.28 1489.04 100.58100.19 11.50 211.02 4242.00 50.32 210.55 3624.31 3492.31 -1342.45 -788.62 262523.75 2543168.82 60°57'15.535"N 151°20'09.558"W 0.89 -51.03 -0.80 0.52 1507.70 100.59100.19 11.52 211.01 4267.00 50.47 210.31 3640.25 3508.25 -1359.06 -798.37 262513.66 2543152.41 60°57'15.372"N 151°20'09.756"W 0.95 -37.65 0.60 -0.96 1526.35 100.61100.19 11.54 211.00 4292.00 50.49 210.29 3656.16 3524.16 -1375.71 -808.10 262503.59 2543135.96 60°57'15.208"N 151°20'09.953"W 0.10 149.96 0.08 -0.08 1545.02 100.62100.19 11.56 210.99 4317.00 50.45 210.32 3672.07 3540.07 -1392.36 -817.83 262493.53 2543119.52 60°57'15.044"N 151°20'10.150"W 0.18 -83.87 -0.16 0.12 1563.68 100.63100.19 11.58 210.98 4342.00 50.46 210.20 3687.99 3555.99 -1409.01 -827.55 262483.48 2543103.07 60°57'14.880"N 151°20'10.346"W 0.37 -17.17 0.04 -0.48 1582.33 100.64100.20 11.60 210.97 4367.00 50.56 210.16 3703.88 3571.88 -1425.69 -837.25 262473.44 2543086.59 60°57'14.716"N 151°20'10.543"W 0.42 -78.78 0.40 -0.16 1601.00 100.66100.20 11.62 210.95 4392.00 50.58 210.03 3719.76 3587.76 -1442.40 -846.93 262463.42 2543070.08 60°57'14.551"N 151°20'10.739"W 0.41 -15.46 0.08 -0.52 1619.67 100.67100.20 11.64 210.94 4417.00 50.72 209.98 3735.61 3603.61 -1459.14 -856.60 262453.42 2543053.54 60°57'14.386"N 151°20'10.935"W 0.58 144.70 0.56 -0.20 1638.35 100.68100.20 11.66 210.93 4442.00 50.60 210.09 3751.46 3619.46 -1475.88 -866.27 262443.40 2543037.01 60°57'14.221"N 151°20'11.131"W 0.59 -83.33 -0.48 0.44 1657.04 100.70100.20 11.68 210.92 4467.00 50.61 209.98 3767.33 3635.33 -1492.60 -875.94 262433.39 2543020.48 60°57'14.057"N 151°20'11.326"W 0.34 75.51 0.04 -0.44 1675.71 100.71 100.21 11.70 210.90 4492.00 50.62 210.03 3783.19 3651.19 -1509.33 -885.61 262423.39 2543003.95 60°57'13.892"N 151°20'11.522"W 0.16 0.00 0.04 0.20 1694.39 100.73 100.21 11.72 210.89 4517.00 50.77 210.03 3799.03 3667.03 -1526.08 -895.29 262413.38 2542987.40 60°57'13.727"N 151°20'11.718"W 0.60 -23.31 0.60 0.00 1713.09 100.74 100.21 11.74 210.88 4542.00 50.86 209.98 3814.82 3682.82 -1542.86 -904.98 262403.35 2542970.82 60°57'13.562"N 151°20'11.914"W 0.39 -14.52 0.36 -0.20 1731.82 100.76100.21 11.76 210.87 4567.00 50.98 209.94 3830.58 3698.58 -1559.68 -914.67 262393.32 2542954.21 60°57'13.396"N 151°20'12.110"W 0.50 -142.20 0.48 -0.16 1750.57 100.77 100.21 11.78 210.86 4592.00 50.90 209.86 3846.34 3714.34 -1576.50 -924.35 262383.30 2542937.58 60°57'13.231"N 151°20'12.306"W 0.41 -167.87 -0.32 -0.32 1769.32 100.78 100.22 11.80 210.85 4617.00 50.72 209.81 3862.13 3730.13 -1593.31 -933.99 262373.32 2542920.97 60°57'13.065"N 151°20'12.502"W 0.74 -17.22 -0.72 -0.20 1788.03 100.80 100.22 11.82 210.83 4642.00 50.77 209.79 3877.95 3745.95 -1610.11 -943.61 262363.36 2542904.37 60°57'12.900"N 151°20'12.696"W 0.21 57.18 0.20 -0.08 1806.72 100.82 100.22 11.85 210.82 4667.00 50.80 209.85 3893.76 3761.76 -1626.92 -953.24 262353.39 2542887.77 60°57'12.734"N 151°20'12.891"W 0.22 -61.78 0.12 0.24 1825.43 100.83 100.22 11.87 210.81 4692.00 50.85 209.73 3909.55 3777.55 -1643.74 -962.87 262343.42 2542871.15 60°57'12.568"N 151°20'13.086"W 0.42 -164.10 0.20 -0.48 1844.14 100.85 100.22 11.89 210.80 4717.00 50.66 209.66 3925.37 3793.37 -1660.55 -972.46 262333.49 2542854.53 60°57'12.403"N 151°20'13.280"W 0.79 -154.77 -0.76 -0.28 1862.83 100.86 100.23 11.91 210.78 4742.00 50.48 209.55 3941.25 3809.25 -1677.34 -982.00 262323.61 2542837.94 60°57'12.238"N 151°20'13.474"W 0.80 -51.02 -0.72 -0.44 1881.45 100.88 100.23 11.93 210.77 4767.00 50.53 209.47 3957.15 3825.15 -1694.13 -991.50 262313.77 2542821.35 60°57'12.072"N 151°20'13.666"W 0.32 -172.18 0.20 -0.32 1900.05 100.89 100.23 11.96 210.76 4792.00 50.25 209.42 3973.09 3841.09 -1710.90 -1000.97 262303.97 2542804.77 60°57'11.907"N 151°20'13.858"W 1.13 -98.25 -1.12 -0.20 1918.62 100.91 100.23 11.98 210.74 4817.00 50.24 209.33 3989.07 3857.07 -1727.65 -1010.40 262294.20 2542788.22 60°57'11.742"N 151°20'14.049"W 0.28 90.02 -0.04 -0.36 1937.14 100.93 100.24 12.00 210.73 4842.00 50.24 209.38 4005.06 3873.06 -1744.40 -1019.82 262284.44 2542771.66 60°57'11.577"N 151°20'14.239"W 0.15 -83.78 0.00 0.20 1955.66 100.94100.24 12.03 210.71 4973.00 50.33 208.36 4088.77 3956.77 -1832.65 -1068.47 262234.01 2542684.43 60°57'10.708"N 151°20'15.224"W 0.60 100.68 0.07 -0.78 2052.51 100.99 100.34 11.90 211.02 Tie On Point to GP-555023.09 50.09 210.11 4120.83 3988.83 -1866.23 -1087.27 262214.53 2542651.23 60°57'10.377"N 151°20'15.605"W 2.73 149.55 -0.48 3.49 2089.57 101.02 100.35 11.95 210.92 5094.60 48.43 211.42 4167.50 4035.50 -1912.79 -1114.97 262185.89 2542605.25 60°57'09.919"N 151°20'16.166"W 2.70 170.78 -2.32 1.83 2142.11 101.30 100.37 12.24 210.84 5189.82 45.74 212.03 4232.33 4100.33 -1972.10 -1151.63 262148.03 2542546.70 60°57'09.335"N 151°20'16.908"W 2.86 175.03 -2.83 0.64 2210.01 102.11 100.46 13.04 211.10 5283.77 41.47 212.59 4300.34 4168.34 -2026.86 -1186.25 262112.31 2542492.66 60°57'08.796"N 151°20'17.609"W 4.56 176.41 -4.54 0.60 2273.24 103.33 100.60 14.17 211.41 5377.25 37.76 212.97 4372.34 4240.34 -2076.97 -1218.51 262079.05 2542443.22 60°57'08.302"N 151°20'18.262"W 3.98 167.88 -3.97 0.41 2331.50 104.82 100.82 15.47 211.69 5472.07 33.92 214.45 4449.19 4317.19 -2123.16 -1249.28 262047.34 2542397.66 60°57'07.847"N 151°20'18.885"W 4.15 152.55 -4.05 1.56 2385.95 106.53 101.13 16.81 212.00 5566.63 31.36 217.03 4528.82 4396.82 -2164.57 -1279.03 262016.75 2542356.87 60°57'07.439"N 151°20'19.487"W 3.08 146.63 -2.71 2.73 2436.28 108.34 101.51 18.14 212.46 5661.75 28.48 221.09 4611.26 4479.26 -2201.43 -1308.85 261986.19 2542320.62 60°57'07.076"N 151°20'20.091"W 3.70 147.97 -3.03 4.27 2483.45 110.23 101.99 19.44 213.12 5758.13 24.47 227.34 4697.53 4565.53 -2232.30 -1338.65 261955.77 2542290.37 60°57'06.772"N 151°20'20.694"W 5.06 153.47 -4.16 6.48 2526.35 112.08 102.56 20.67 213.97 5851.77 21.11 232.09 4783.86 4651.86 -2255.81 -1366.23 261927.72 2542267.42 60°57'06.541"N 151°20'21.253"W 4.09 152.43 -3.59 5.07 2562.46 113.73 103.22 21.74 214.85 5946.44 18.04 237.39 4873.05 4741.05 -2274.19 -1392.04 261901.55 2542249.57 60°57'06.360"N 151°20'21.775"W 3.74 146.10 -3.24 5.60 2593.70 115.23 103.96 22.70 215.62 6040.98 15.10 245.35 4963.67 4831.67 -2287.22 -1415.57 261877.76 2542237.02 60°57'06.232"N 151°20'22.252"W 3.92 134.50 -3.11 8.42 2619.53 116.51 104.76 23.54 216.23 6135.51 13.29 254.04 5055.32 4923.32 -2295.34 -1437.21 261855.96 2542229.34 60°57'06.151"N 151°20'22.690"W 2.95 93.70 -1.91 9.19 2640.56 117.59105.59 24.26 216.64 6230.76 13.28 260.90 5148.02 5016.02 -2300.08 -1458.54 261834.54 2542225.03 60°57'06.105"N 151°20'23.122"W 1.65 86.55 -0.01 7.20 2658.97 118.59106.42 24.96 216.93 6324.96 13.32 263.10 5239.70 5107.70 -2303.10 -1479.99 261813.03 2542222.45 60°57'06.075"N 151°20'23.556"W 0.54 -95.85 0.04 2.34 2676.25 119.59107.25 25.65 217.14 6421.64 13.31 262.66 5333.78 5201.78 -2305.86 -1502.09 261790.88 2542220.14 60°57'06.048"N 151°20'24.003"W 0.11 -102.88 -0.01 -0.46 2693.80 120.66 108.16 26.36 217.26 6515.03 13.26 261.67 5424.67 5292.67 -2308.78 -1523.35 261769.57 2542217.65 60°57'06.019"N 151°20'24.434"W 0.25 -99.46 -0.05 -1.06 2710.87 121.75 109.12 27.06 217.25 6608.81 13.17 258.91 5515.97 5383.97 -2312.40 -1544.47 261748.37 2542214.47 60°57'05.983"N 151°20'24.862"W 0.68 84.74 -0.10 -2.94 2728.34 122.92 110.16 27.76 217.12 6704.22 13.32 263.79 5608.84 5476.84 -2315.68 -1566.07 261726.72 2542211.63 60°57'05.951"N 151°20'25.299"W 1.18 100.43 0.16 5.11 2745.90 124.15111.27 28.47 216.91 6799.86 13.25 265.60 5701.92 5569.92 -2317.71 -1587.95 261704.80 2542210.04 60°57'05.931"N 151°20'25.742"W 0.44 -87.83 -0.07 1.89 2762.78 125.40 112.39 29.20 216.65 6895.35 13.28 263.32 5794.87 5662.87 -2319.82 -1609.75 261682.96 2542208.37 60°57'05.910"N 151°20'26.183"W 0.55 126.00 0.03 -2.39 2779.66 126.71 113.58 29.93 216.30 6990.85 13.27 263.38 5887.82 5755.82 -2322.36 -1631.53 261661.13 2542206.27 60°57'05.885"N 151°20'26.624"W 0.02 90.36 -0.01 0.06 2796.83 128.08114.83 30.66 215.86 7089.32 13.27 264.11 5983.66 5851.66 -2324.83 -1654.00 261638.62 2542204.27 60°57'05.861"N 151°20'27.079"W 0.17 -170.16 0.00 0.74 2814.43 129.55 116.17 31.42 215.33 7182.9812.70263.666074.925942.92-2327.07-1674.93261617.662542202.4560°57'05.839"N151°20'27.503"W0.628.47-0.61-0.482830.78130.97117.4932.13214.70 Page 3 of 4 7277.38 13.50 264.17 6166.86 6034.86 -2329.33 -1696.20 261596.34 2542200.62 60°57'05.816"N 151°20'27.934"W 0.86 127.76 0.85 0.54 2847.40 132.46118.86 32.85 214.03 7371.71 13.32 265.19 6258.62 6126.62 -2331.36 -1717.98 261574.52 2542199.03 60°57'05.796"N 151°20'28.375"W 0.32 84.51 -0.19 1.08 2864.21 134.01120.27 33.59 213.38 7468.87 13.34 266.03 6353.16 6221.16 -2333.07 -1740.32 261552.16 2542197.77 60°57'05.780"N 151°20'28.827"W 0.20 94.83 0.02 0.86 2881.19 135.64 121.74 34.36 212.65 7561.60 13.31 267.94 6443.40 6311.40 -2334.20 -1761.66 261530.80 2542197.08 60°57'05.768"N 151°20'29.259"W 0.48 -95.44 -0.03 2.06 2897.04 137.24 123.17 35.09 211.93 7656.50 13.25 263.10 6535.76 6403.76 -2335.90 -1783.37 261509.06 2542195.83 60°57'05.752"N 151°20'29.699"W 1.17 82.42 -0.06 -5.10 2913.57 138.93 124.68 35.84 211.13 7753.01 13.31 264.86 6629.69 6497.69 -2338.22 -1805.42 261486.97 2542193.95 60°57'05.729"N 151°20'30.145"W 0.42 -92.99 0.06 1.82 2930.77 140.71126.27 36.60 210.26 7846.79 13.30 259.72 6720.96 6588.96 -2341.11 -1826.78 261465.55 2542191.49 60°57'05.700"N 151°20'30.578"W 1.26 -93.12 -0.01 -5.48 2947.90 142.49 127.88 37.35 209.37 7940.60 13.28 256.27 6812.26 6680.26 -2345.60 -1847.87 261444.38 2542187.44 60°57'05.656"N 151°20'31.005"W 0.85 91.81 -0.02 -3.68 2965.95 144.34 129.57 38.09 208.40 8035.04 13.28 259.98 6904.17 6772.17 -2350.06 -1869.09 261423.08 2542183.41 60°57'05.612"N 151°20'31.434"W 0.90 90.74 0.00 3.93 2984.08 146.24 131.30 38.85 207.40 8129.91 13.30 264.03 6996.51 6864.51 -2353.09 -1890.67 261401.44 2542180.82 60°57'05.582"N 151°20'31.871"W 0.98 -92.40 0.02 4.27 3001.46 148.17133.00 39.61 206.44 8225.21 13.29 262.55 7089.25 6957.25 -2355.65 -1912.43 261379.63 2542178.70 60°57'05.557"N 151°20'32.312"W 0.36 96.68 -0.01 -1.55 3018.63 150.15 134.72 40.37 205.48 8320.35 13.22 266.06 7181.86 7049.86 -2357.82 -1934.13 261357.89 2542176.98 60°57'05.536"N 151°20'32.751"W 0.85 -86.94 -0.07 3.69 3035.48 152.16 136.43 41.14 204.52 8415.56 13.29 262.44 7274.53 7142.53 -2360.00 -1955.84 261336.14 2542175.23 60°57'05.514"N 151°20'33.191"W 0.87 -90.97 0.07 -3.80 3052.35 154.21 138.16 41.91 203.58 8510.76 13.32 257.40 7367.18 7235.18 -2363.84 -1977.39 261314.52 2542171.84 60°57'05.476"N 151°20'33.627"W 1.22 115.10 0.03 -5.29 3070.27 156.33 139.98 42.68 202.58 8605.85 13.29 257.68 7459.72 7327.72 -2368.56 -1998.76 261293.06 2542167.55 60°57'05.430"N 151°20'34.060"W 0.07 84.44 -0.03 0.29 3088.69 158.48141.84 43.45 201.55 8700.32 13.32 258.89 7551.65 7419.65 -2372.97 -2020.05 261271.69 2542163.57 60°57'05.386"N 151°20'34.491"W 0.30 95.06 0.03 1.28 3106.84 160.66 143.69 44.22 200.55 8794.81 13.31 268.78 7643.62 7511.62 -2375.30 -2041.60 261250.09 2542161.68 60°57'05.363"N 151°20'34.927"W 2.41 90.71 -0.01 10.47 3123.70 162.85 145.47 44.99 199.67 8889.39 13.33 272.79 7735.65 7603.65 -2375.00 -2063.38 261228.32 2542162.42 60°57'05.366"N 151°20'35.368"W 0.98 -95.43 0.02 4.24 3138.86 165.03147.16 45.76 198.95 8987.50 13.27 267.91 7831.14 7699.14 -2374.86 -2085.93 261205.78 2542163.02 60°57'05.367"N 151°20'35.825"W 1.15 -90.95 -0.06 -4.97 3154.67 167.33 148.93 46.57 198.22 9080.66 13.30 262.89 7921.81 7789.81 -2376.58 -2107.25 261184.43 2542161.74 60°57'05.351"N 151°20'36.256"W 1.24 -87.47 0.03 -5.39 3170.93 169.59 150.71 47.33 197.45 9173.80 13.32 261.37 8012.44 7880.44 -2379.51 -2128.49 261163.14 2542159.23 60°57'05.322"N 151°20'36.686"W 0.38 82.19 0.02 -1.63 3188.00 171.90152.55 48.10 196.64 9268.56 13.52 266.18 8104.62 7972.62 -2381.89 -2150.33 261141.25 2542157.30 60°57'05.298"N 151°20'37.129"W 1.20 92.21 0.21 5.08 3205.10 174.26 154.41 48.88 195.90 9361.75 13.51 268.09 8195.23 8063.23 -2382.98 -2172.08 261119.49 2542156.65 60°57'05.287"N 151°20'37.569"W 0.48 -94.90 -0.01 2.05 3221.21 176.61 156.21 49.66 195.28 9458.04 13.46 263.48 8288.87 8156.87 -2384.63 -2194.46 261097.08 2542155.46 60°57'05.271"N 151°20'38.022"W 1.12 -46.46 -0.05 -4.79 3238.17 179.07 158.10 50.47 194.63 9551.90 13.50 263.30 8380.14 8248.14 -2387.14 -2216.19 261075.30 2542153.38 60°57'05.246"N 151°20'38.462"W 0.06 -110.16 0.04 -0.19 3255.29 181.50 159.99 51.25 193.98 9645.51 13.28 260.51 8471.21 8339.21 -2390.19 -2237.65 261053.79 2542150.77 60°57'05.216"N 151°20'38.897"W 0.73 86.14 -0.24 -2.98 3272.59 183.96 161.90 52.04 193.31 9742.98 13.29 261.11 8566.07 8434.07 -2393.77 -2259.76 261031.61 2542147.65 60°57'05.181"N 151°20'39.344"W 0.14 -60.01 0.01 0.62 3290.73 186.54163.89 52.85 192.60 Tie On Point to GP55RD PB19813.00 13.85 257.27 8634.14 8502.14 -2396.86 -2275.88 261015.43 2542144.88 60°57'05.151"N 151°20'39.671"W 1.51 135.65 0.80 -5.48 3304.30 187.48 164.58 53.57 192.42 Kick Off Point9858.36 11.21 272.68 8678.42 8546.42 -2397.85 -2285.59 261005.71 2542144.09 60°57'05.141"N 151°20'39.867"W 9.34 125.78 -5.82 33.97 3311.85 187.48 164.58 53.61 192.42 9929.93 10.46 278.88 8748.72 8616.72 -2396.52 -2298.96 260992.37 2542145.69 60°57'05.154"N 151°20'40.138"W 1.94 -47.73 -1.05 8.66 3320.34 187.48 164.59 53.67 192.41 10025.24 15.58 260.72 8841.59 8709.59 -2397.25 -2320.16 260971.16 2542145.39 60°57'05.147"N 151°20'40.567"W 6.81 -53.81 5.37 -19.05 3335.82 187.48 164.60 53.75 192.40 10119.61 19.88 245.82 8931.50 8799.50 -2405.88 -2347.33 260943.82 2542137.32 60°57'05.062"N 151°20'41.117"W 6.59 -31.02 4.56 -15.79 3361.10 187.49 164.64 53.83 192.37 10216.33 21.41 243.33 9022.01 8890.01 -2420.54 -2378.11 260912.75 2542123.29 60°57'04.917"N 151°20'41.741"W 1.82 14.10 1.58 -2.57 3393.21 187.50 164.68 53.92 192.36 10310.03 21.87 243.64 9109.10 8977.10 -2435.96 -2409.03 260881.52 2542108.50 60°57'04.765"N 151°20'42.367"W 0.51 89.30 0.49 0.33 3425.96 187.50164.69 54.00 192.36 10395.00 21.89 245.57 9187.95 9055.95 -2449.54 -2437.63 260852.65 2542095.50 60°57'04.631"N 151°20'42.946"W 0.85 -52.47 0.02 2.27 3455.76 187.51 164.69 54.07 192.36 Tie On Point to GP55RD PB210632.41 35.07 221.35 9396.84 9264.84 -2519.58 -2523.64 260765.24 2542027.23 60°57'03.942"N 151°20'44.687"W 7.28 -20.00 5.55 -10.20 3566.08 187.60 165.17 54.30 192.65 10756.0048.64214.939488.739356.73-2584.59-2573.91260713.662541963.2660°57'03.301"N151°20'45.704"W11.500.0010.98-5.203647.62187.69165.7254.83193.18Projection to TDPage 4 of 4 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797000 Location S13 T10N R12E Well GP-55RD PB1 Wellbore GP-55RD PB1 Rig Spartan 151 Job 110026730 Well Origin Latitude 60.958 deg Longitude -151.332 deg North Reference True Drill Depth Zero Rotary Table Vertical Datum is Mean Sea Level Vertical Datum to DDZ 132.00 ft Vertical Section North 0.00 ft Vertical Section East 0.00 ft Vertical Section Azimuth 211.470 deg Vertical Section Depth 0.00 ft Grid Convergence 0.000 deg Magnetic Declination 15.807 deg Total Correction 15.807 deg TVD Calculation Method Minimum Curvature D-Raw Calculation None Local Magnetic Field 55291 nT Local Magnetic Dip Angle 73.836 deg Local Gravity Field 9.820 m/s^2 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft T 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.00 0.00 301.62 0.00 0.00 17.00 0.00 17.00 0.00 0.00 -343.41 42.00 0.02 301.62 0.00 -0.00 42.00 -0.00 25.00 0.08 0.08 0.00 67.00 0.04 301.62 0.01 -0.01 67.00 -0.00 25.00 0.08 0.08 0.00 92.00 0.06 301.62 0.02 -0.03 92.00 -0.00 25.00 0.08 0.08 0.00 117.00 0.09 301.62 0.04 -0.06 117.00 -0.00 25.00 0.12 0.12 0.00 142.00 0.11 301.62 0.06 -0.10 142.00 -0.00 25.00 0.08 0.08 0.00 167.00 0.13 301.62 0.09 -0.14 167.00 -0.00 25.00 0.08 0.08 0.00 192.00 0.15 301.62 0.12 -0.20 192.00 -0.00 25.00 0.08 0.08 0.00 217.00 0.17 301.62 0.16 -0.25 217.00 -0.00 25.00 0.08 0.08 0.00 242.00 0.19 301.62 0.20 -0.32 242.00 -0.00 25.00 0.08 0.08 0.00 267.00 0.21 301.62 0.24 -0.40 267.00 -0.00 25.00 0.08 0.08 0.00 292.00 0.37 340.74 0.34 -0.46 292.00 -0.05 25.00 0.98 0.64 156.48 317.00 0.48 333.70 0.51 -0.53 317.00 -0.16 25.00 0.49 0.44 -28.16 342.00 0.51 331.04 0.71 -0.63 342.00 -0.27 25.00 0.15 0.12 -10.64 367.00 0.55 332.25 0.91 -0.74 367.00 -0.39 25.00 0.17 0.16 4.84 392.00 0.63 328.84 1.13 -0.87 392.00 -0.51 25.00 0.35 0.32 -13.64 417.00 0.61 318.57 1.35 -1.03 416.99 -0.61 25.00 0.45 -0.08 -41.08 442.00 0.58 307.74 1.53 -1.22 441.99 -0.67 25.00 0.46 -0.12 -43.32 467.00 0.70 289.09 1.65 -1.46 466.99 -0.65 25.00 0.96 0.48 -74.60 492.00 0.88 280.94 1.74 -1.80 491.99 -0.55 25.00 0.85 0.72 -32.60 517.00 1.12 266.44 1.76 -2.23 516.98 -0.34 25.00 1.39 0.96 -58.00 542.00 1.27 258.35 1.69 -2.74 541.98 -0.01 25.00 0.90 0.60 -32.36 567.00 1.37 255.30 1.56 -3.30 566.97 0.39 25.00 0.49 0.40 -12.20 592.00 1.47 250.83 1.38 -3.90 591.96 0.86 25.00 0.60 0.40 -17.88 617.00 1.53 243.57 1.12 -4.50 616.96 1.39 25.00 0.80 0.24 -29.04 642.00 1.58 241.45 0.81 -5.10 641.95 1.97 25.00 0.30 0.20 -8.48 667.00 1.61 235.84 0.45 -5.69 666.94 2.59 25.00 0.64 0.12 -22.44 692.00 1.64 233.81 0.04 -6.27 691.93 3.24 25.00 0.26 0.12 -8.12 717.00 1.53 228.41 -0.39 -6.81 716.92 3.89 25.00 0.74 -0.44 -21.60 742.00 1.33 223.04 -0.83 -7.26 741.91 4.49 25.00 0.96 -0.80 -21.48 767.00 1.07 207.45 -1.24 -7.56 766.90 5.01 25.00 1.66 -1.04 -62.36 792.00 0.94 186.73 -1.66 -7.70 791.90 5.43 25.00 1.53 -0.52 -82.88 817.00 0.92 166.48 -2.05 -7.67 816.90 5.76 25.00 1.31 -0.08 -81.00 842.00 1.03 149.04 -2.44 -7.51 841.89 6.00 25.00 1.26 0.44 -69.76 867.00 1.13 145.27 -2.84 -7.25 866.89 6.21 25.00 0.49 0.40 -15.08 892.00 1.14 142.68 -3.24 -6.96 891.88 6.40 25.00 0.21 0.04 -10.36 917.00 1.09 142.44 -3.62 -6.67 916.88 6.57 25.00 0.20 -0.20 -0.96 942.00 1.12 136.72 -3.99 -6.35 941.88 6.72 25.00 0.46 0.12 -22.88 967.00 1.18 135.60 -4.35 -6.01 966.87 6.85 25.00 0.26 0.24 -4.48 992.00 1.14 137.32 -4.72 -5.66 991.87 6.98 25.00 0.21 -0.16 6.88 1017.00 1.10 134.02 -5.07 -5.32 1016.86 7.10 25.00 0.30 -0.16 -13.20 1042.00 1.13 133.08 -5.40 -4.96 1041.86 7.20 25.00 0.14 0.12 -3.76 1067.00 1.10 134.95 -5.74 -4.61 1066.85 7.31 25.00 0.19 -0.12 7.48 1092.00 1.06 135.20 -6.08 -4.28 1091.85 7.42 25.00 0.16 -0.16 1.00 1117.00 1.10 136.15 -6.41 -3.95 1116.84 7.53 25.00 0.18 0.16 3.80 1142.00 1.07 136.43 -6.75 -3.63 1141.84 7.65 25.00 0.12 -0.12 1.12 1167.00 1.21 128.43 -7.09 -3.26 1166.83 7.75 25.00 0.85 0.56 -32.00 1192.00 1.10 129.99 -7.41 -2.87 1191.83 7.81 25.00 0.46 -0.44 6.24 1217.00 1.11 132.27 -7.72 -2.50 1216.82 7.89 25.00 0.18 0.04 9.12 Page 1 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797000 Location S13 T10N R12E Well GP-55RD PB1 Wellbore GP-55RD PB1 Rig Spartan 151 Job 110026730 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft 1242.00 1.07 137.76 -8.06 -2.17 1241.82 8.01 25.00 0.45 -0.16 21.96 1267.00 1.12 136.12 -8.41 -1.84 1266.81 8.13 25.00 0.24 0.20 -6.56 1292.00 1.23 137.13 -8.78 -1.49 1291.81 8.27 25.00 0.45 0.44 4.04 1317.00 1.19 136.36 -9.17 -1.13 1316.80 8.41 25.00 0.17 -0.16 -3.08 1342.00 1.29 134.86 -9.55 -0.75 1341.80 8.54 25.00 0.42 0.40 -6.00 1367.00 1.22 132.93 -9.93 -0.35 1366.79 8.66 25.00 0.33 -0.28 -7.72 1392.00 1.03 130.48 -10.26 0.01 1391.79 8.74 25.00 0.78 -0.76 -9.80 1417.00 1.05 133.91 -10.56 0.35 1416.78 8.83 25.00 0.26 0.08 13.72 1442.00 1.09 131.30 -10.88 0.69 1441.78 8.92 25.00 0.25 0.16 -10.44 1467.00 1.09 124.83 -11.17 1.06 1466.77 8.97 25.00 0.49 0.00 -25.88 1492.00 1.00 131.98 -11.45 1.42 1491.77 9.03 25.00 0.63 -0.36 28.60 1517.00 1.01 141.27 -11.77 1.72 1516.77 9.14 25.00 0.65 0.04 37.16 1542.00 1.44 159.55 -12.24 1.97 1541.76 9.41 25.00 2.30 1.72 73.12 1567.00 2.58 186.11 -13.09 2.02 1566.74 10.11 25.00 5.77 4.56 106.24 1592.00 3.81 193.65 -14.46 1.76 1591.71 11.41 25.00 5.19 4.92 30.16 1617.00 4.55 196.13 -16.22 1.29 1616.64 13.16 25.00 3.05 2.96 9.92 1642.00 5.22 197.76 -18.25 0.67 1641.55 15.22 25.00 2.74 2.68 6.52 1667.00 5.45 199.33 -20.46 -0.07 1666.44 17.48 25.00 1.09 0.92 6.28 1692.00 5.52 199.95 -22.71 -0.87 1691.32 19.82 25.00 0.37 0.28 2.48 1717.00 5.87 200.98 -25.03 -1.74 1716.20 22.26 25.00 1.46 1.40 4.12 1742.00 6.45 203.37 -27.51 -2.76 1741.06 24.91 25.00 2.54 2.32 9.56 1767.00 7.21 206.49 -30.21 -4.01 1765.88 27.86 25.00 3.38 3.04 12.48 1792.00 8.20 209.03 -33.17 -5.58 1790.65 31.20 25.00 4.19 3.96 10.16 1817.00 9.07 210.08 -36.43 -7.43 1815.37 34.95 25.00 3.54 3.48 4.20 1842.00 10.12 211.33 -40.02 -9.56 1840.02 39.12 25.00 4.28 4.20 5.00 1867.00 11.44 212.77 -43.98 -12.04 1864.58 43.80 25.00 5.39 5.28 5.76 1892.00 12.69 213.12 -48.36 -14.89 1889.03 49.02 25.00 5.01 5.00 1.40 1917.00 13.84 212.91 -53.17 -18.01 1913.36 54.75 25.00 4.60 4.60 -0.84 1942.00 14.92 212.52 -58.40 -21.37 1937.57 60.96 25.00 4.34 4.32 -1.56 1967.00 15.64 212.30 -63.96 -24.90 1961.69 67.55 25.00 2.89 2.88 -0.88 1992.00 16.31 211.95 -69.79 -28.56 1985.72 74.43 25.00 2.71 2.68 -1.40 2017.00 16.61 211.95 -75.80 -32.31 2009.70 81.51 25.00 1.20 1.20 0.00 2042.00 17.06 212.17 -81.93 -36.15 2033.63 88.75 25.00 1.82 1.80 0.88 2067.00 17.85 212.64 -88.26 -40.17 2057.48 96.25 25.00 3.21 3.16 1.88 2092.00 18.63 212.33 -94.86 -44.37 2081.22 104.07 25.00 3.14 3.12 -1.24 2117.00 19.26 212.49 -101.72 -48.72 2104.87 112.19 25.00 2.53 2.52 0.64 2142.00 19.83 212.83 -108.76 -53.23 2128.43 120.55 25.00 2.32 2.28 1.36 2167.00 20.61 213.01 -116.01 -57.93 2151.89 129.19 25.00 3.13 3.12 0.72 2192.00 21.41 213.27 -123.51 -62.83 2175.22 138.15 25.00 3.22 3.20 1.04 2217.00 22.60 213.46 -131.34 -67.98 2198.40 147.51 25.00 4.77 4.76 0.76 2242.00 23.86 213.64 -139.55 -73.43 2221.37 157.36 25.00 5.05 5.04 0.72 2267.00 25.01 213.86 -148.15 -79.18 2244.13 167.70 25.00 4.61 4.60 0.88 2292.00 26.20 214.06 -157.11 -85.21 2266.68 178.49 25.00 4.77 4.76 0.80 2317.00 27.01 213.91 -166.40 -91.47 2289.03 189.68 25.00 3.25 3.24 -0.60 2342.00 27.59 213.85 -175.92 -97.86 2311.25 201.13 25.00 2.32 2.32 -0.24 2367.00 28.35 214.01 -185.65 -104.41 2333.33 212.85 25.00 3.05 3.04 0.64 2392.00 29.15 214.56 -195.58 -111.18 2355.24 224.86 25.00 3.37 3.20 2.20 2417.00 29.72 214.34 -205.71 -118.13 2377.02 237.13 25.00 2.32 2.28 -0.88 2442.00 30.37 214.25 -216.05 -125.18 2398.66 249.63 25.00 2.61 2.60 -0.36 2467.00 31.18 213.61 -226.67 -132.32 2420.14 262.41 25.00 3.49 3.24 -2.56 2492.00 32.14 212.85 -237.64 -139.51 2441.42 275.52 25.00 4.16 3.84 -3.04 2517.00 32.93 212.56 -248.96 -146.78 2462.49 288.96 25.00 3.22 3.16 -1.16 2542.00 33.39 212.18 -260.51 -154.10 2483.42 302.64 25.00 2.02 1.84 -1.52 2567.00 34.44 211.78 -272.34 -161.49 2504.17 316.58 25.00 4.29 4.20 -1.60 2592.00 35.58 211.55 -284.55 -169.01 2524.64 330.93 25.00 4.59 4.56 -0.92 2617.00 36.40 211.25 -297.09 -176.67 2544.87 345.62 25.00 3.35 3.28 -1.20 2642.00 37.08 210.79 -309.90 -184.37 2564.91 360.57 25.00 2.93 2.72 -1.84 2667.00 38.18 209.97 -323.07 -192.09 2584.71 375.83 25.00 4.83 4.40 -3.28 2692.00 39.37 209.25 -336.68 -199.83 2604.20 391.48 25.00 5.09 4.76 -2.88 2717.00 40.60 208.88 -350.72 -207.63 2623.35 407.53 25.00 5.01 4.92 -1.48 Page 2 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797000 Location S13 T10N R12E Well GP-55RD PB1 Wellbore GP-55RD PB1 Rig Spartan 151 Job 110026730 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft 2742.00 41.73 208.97 -365.13 -215.59 2642.17 423.97 25.00 4.53 4.52 0.36 2767.00 42.87 209.36 -379.82 -223.79 2660.66 440.78 25.00 4.68 4.56 1.56 2792.00 44.11 209.79 -394.78 -232.28 2678.80 457.98 25.00 5.10 4.96 1.72 2817.00 44.94 210.18 -409.97 -241.04 2696.62 475.50 25.00 3.50 3.32 1.56 2842.00 45.55 210.50 -425.29 -250.01 2714.22 493.25 25.00 2.60 2.44 1.28 2867.00 46.81 210.81 -440.80 -259.21 2731.53 511.29 25.00 5.12 5.04 1.24 2892.00 48.09 210.96 -456.61 -268.66 2748.44 529.70 25.00 5.14 5.12 0.60 2917.00 48.69 210.99 -472.63 -278.28 2765.04 548.39 25.00 2.40 2.40 0.12 2942.00 48.93 211.25 -488.74 -288.01 2781.50 567.21 25.00 1.24 0.96 1.04 2967.00 49.21 211.19 -504.89 -297.80 2797.88 586.09 25.00 1.13 1.12 -0.24 2992.00 49.08 211.28 -521.06 -307.60 2814.24 605.00 25.00 0.59 -0.52 0.36 3017.00 49.04 211.24 -537.20 -317.40 2830.62 623.89 25.00 0.20 -0.16 -0.16 3042.00 49.19 211.28 -553.36 -327.21 2846.98 642.79 25.00 0.61 0.60 0.16 3067.00 49.31 211.28 -569.55 -337.04 2863.30 661.73 25.00 0.48 0.48 0.00 3092.00 49.38 211.34 -585.75 -346.90 2879.59 680.69 25.00 0.33 0.28 0.24 3117.00 49.43 210.70 -602.02 -356.68 2895.86 699.68 25.00 1.95 0.20 -2.56 3142.00 49.42 209.85 -618.42 -366.25 2912.12 718.66 25.00 2.58 -0.04 -3.40 3167.00 49.82 209.33 -634.98 -375.66 2928.31 737.69 25.00 2.25 1.60 -2.08 3192.00 49.97 209.38 -651.64 -385.03 2944.42 756.80 25.00 0.62 0.60 0.20 3217.00 49.80 209.46 -668.30 -394.42 2960.53 775.91 25.00 0.72 -0.68 0.32 3242.00 49.47 209.24 -684.90 -403.76 2976.72 794.95 25.00 1.48 -1.32 -0.88 3267.00 49.52 209.36 -701.48 -413.06 2992.95 813.94 25.00 0.42 0.20 0.48 3292.00 49.60 209.22 -718.07 -422.37 3009.17 832.95 25.00 0.53 0.32 -0.56 3317.00 49.55 209.42 -734.67 -431.69 3025.38 851.97 25.00 0.64 -0.20 0.80 3342.00 49.50 209.50 -751.22 -441.04 3041.61 870.98 25.00 0.32 -0.20 0.32 3367.00 49.41 209.50 -767.76 -450.40 3057.86 889.96 25.00 0.36 -0.36 0.00 3392.00 49.39 209.57 -784.27 -459.75 3074.13 908.93 25.00 0.23 -0.08 0.28 3417.00 48.89 209.72 -800.71 -469.11 3090.49 927.83 25.00 2.05 -2.00 0.60 3442.00 48.66 209.94 -817.02 -478.46 3106.96 946.63 25.00 1.13 -0.92 0.88 3467.00 48.49 210.01 -833.26 -487.83 3123.50 965.37 25.00 0.71 -0.68 0.28 3492.00 48.68 210.12 -849.48 -497.22 3140.04 984.11 25.00 0.83 0.76 0.44 3517.00 48.97 210.19 -865.75 -506.67 3156.50 1002.92 25.00 1.18 1.16 0.28 3542.00 48.91 210.23 -882.04 -516.16 3172.92 1021.77 25.00 0.27 -0.24 0.16 3567.00 49.00 210.41 -898.32 -525.67 3189.34 1040.62 25.00 0.65 0.36 0.72 3592.00 49.18 210.45 -914.61 -535.24 3205.71 1059.51 25.00 0.73 0.72 0.16 3617.00 49.53 210.46 -930.96 -544.86 3221.99 1078.48 25.00 1.40 1.40 0.04 3642.00 49.81 210.35 -947.40 -554.50 3238.17 1097.53 25.00 1.17 1.12 -0.44 3667.00 49.81 210.35 -963.88 -564.15 3254.31 1116.62 25.00 0.00 0.00 0.00 3692.00 49.72 210.53 -980.34 -573.82 3270.45 1135.71 25.00 0.66 -0.36 0.72 3717.00 49.33 210.58 -996.71 -583.49 3286.68 1154.72 25.00 1.57 -1.56 0.20 3742.00 49.23 210.50 -1013.03 -593.12 3302.99 1173.67 25.00 0.47 -0.40 -0.32 3767.00 49.00 210.57 -1029.31 -602.72 3319.35 1192.56 25.00 0.94 -0.92 0.28 3792.00 49.13 210.72 -1045.56 -612.35 3335.73 1211.45 25.00 0.69 0.52 0.60 3817.00 49.46 210.79 -1061.85 -622.04 3352.04 1230.40 25.00 1.34 1.32 0.28 3842.00 49.59 210.94 -1078.17 -631.80 3368.27 1249.42 25.00 0.69 0.52 0.60 3867.00 49.79 210.79 -1094.53 -641.58 3384.44 1268.48 25.00 0.92 0.80 -0.60 3892.00 49.93 210.96 -1110.94 -651.38 3400.56 1287.59 25.00 0.76 0.56 0.68 3917.00 50.05 210.95 -1127.36 -661.23 3416.63 1306.74 25.00 0.48 0.48 -0.04 3942.00 50.06 210.74 -1143.81 -671.06 3432.68 1325.90 25.00 0.65 0.04 -0.84 3967.00 50.06 210.74 -1160.29 -680.86 3448.73 1345.07 25.00 0.00 0.00 0.00 3992.00 50.18 210.79 -1176.77 -690.67 3464.76 1364.25 25.00 0.50 0.48 0.20 4017.00 50.24 210.65 -1193.29 -700.48 3480.76 1383.46 25.00 0.49 0.24 -0.56 4042.00 50.31 210.60 -1209.83 -710.28 3496.74 1402.69 25.00 0.32 0.28 -0.20 4067.00 50.33 210.67 -1226.39 -720.08 3512.70 1421.92 25.00 0.23 0.08 0.28 4092.00 50.34 210.65 -1242.94 -729.90 3528.66 1441.17 25.00 0.07 0.04 -0.08 4117.00 50.29 210.62 -1259.50 -739.70 3544.62 1460.40 25.00 0.22 -0.20 -0.12 4142.00 50.30 210.59 -1276.05 -749.49 3560.59 1479.64 25.00 0.10 0.04 -0.12 4167.00 50.37 210.55 -1292.62 -759.28 3576.55 1498.88 25.00 0.31 0.28 -0.16 4192.00 50.47 210.49 -1309.22 -769.07 3592.48 1518.14 25.00 0.44 0.40 -0.24 4217.00 50.52 210.42 -1325.85 -778.84 3608.38 1537.43 25.00 0.29 0.20 -0.28 Page 3 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797000 Location S13 T10N R12E Well GP-55RD PB1 Wellbore GP-55RD PB1 Rig Spartan 151 Job 110026730 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft 4242.00 50.32 210.55 -1342.45 -788.62 3624.31 1556.70 25.00 0.89 -0.80 0.52 4267.00 50.47 210.31 -1359.06 -798.37 3640.25 1575.95 25.00 0.95 0.60 -0.96 4292.00 50.49 210.29 -1375.71 -808.10 3656.16 1595.23 25.00 0.10 0.08 -0.08 4317.00 50.45 210.32 -1392.36 -817.83 3672.07 1614.51 25.00 0.18 -0.16 0.12 4342.00 50.46 210.20 -1409.01 -827.55 3687.99 1633.79 25.00 0.37 0.04 -0.48 4367.00 50.56 210.16 -1425.69 -837.25 3703.88 1653.08 25.00 0.42 0.40 -0.16 4392.00 50.58 210.03 -1442.40 -846.93 3719.76 1672.38 25.00 0.41 0.08 -0.52 4417.00 50.72 209.98 -1459.14 -856.60 3735.61 1691.71 25.00 0.58 0.56 -0.20 4442.00 50.60 210.09 -1475.88 -866.27 3751.46 1711.03 25.00 0.59 -0.48 0.44 4467.00 50.61 209.98 -1492.60 -875.94 3767.33 1730.35 25.00 0.34 0.04 -0.44 4492.00 50.62 210.03 -1509.33 -885.61 3783.19 1749.66 25.00 0.16 0.04 0.20 4517.00 50.77 210.03 -1526.08 -895.29 3799.03 1769.00 25.00 0.60 0.60 0.00 4542.00 50.86 209.98 -1542.86 -904.98 3814.82 1788.37 25.00 0.39 0.36 -0.20 4567.00 50.98 209.94 -1559.68 -914.67 3830.58 1807.77 25.00 0.50 0.48 -0.16 4592.00 50.90 209.86 -1576.50 -924.35 3846.34 1827.18 25.00 0.41 -0.32 -0.32 4617.00 50.72 209.81 -1593.31 -933.99 3862.13 1846.55 25.00 0.74 -0.72 -0.20 4642.00 50.77 209.79 -1610.11 -943.61 3877.95 1865.90 25.00 0.21 0.20 -0.08 4667.00 50.80 209.85 -1626.92 -953.24 3893.76 1885.26 25.00 0.22 0.12 0.24 4692.00 50.85 209.73 -1643.74 -962.87 3909.55 1904.63 25.00 0.42 0.20 -0.48 4717.00 50.66 209.66 -1660.55 -972.46 3925.37 1923.98 25.00 0.79 -0.76 -0.28 4742.00 50.48 209.55 -1677.34 -982.00 3941.25 1943.28 25.00 0.80 -0.72 -0.44 4767.00 50.53 209.47 -1694.13 -991.50 3957.15 1962.56 25.00 0.32 0.20 -0.32 4792.00 50.25 209.42 -1710.90 -1000.97 3973.09 1981.81 25.00 1.13 -1.12 -0.20 4817.00 50.24 209.33 -1727.65 -1010.40 3989.07 2001.02 25.00 0.28 -0.04 -0.36 4842.00 50.24 209.38 -1744.40 -1019.82 4005.06 2020.22 25.00 0.15 0.00 0.20 4973.00 50.33 208.36 -1832.65 -1068.47 4088.77 2120.89 131.00 0.60 0.07 -0.78 5023.09 50.09 210.11 -1866.23 -1087.27 4120.83 2159.34 93.2 50.09 2.73 -0.48 3.49 5094.60 48.43 211.42 -1912.79 -1114.97 4167.49 2213.51 106.8 71.51 2.70 -2.32 1.83 5189.82 45.74 212.03 -1972.10 -1151.63 4232.33 2283.25 109.5 95.22 2.86 -2.82 0.64 5283.77 41.47 212.59 -2026.86 -1186.25 4300.34 2348.02 114.9 93.95 4.56 -4.55 0.60 5377.25 37.76 212.97 -2076.97 -1218.50 4372.34 2407.59 120.3 93.48 3.98 -3.97 0.41 5472.07 33.92 214.45 -2123.16 -1249.28 4449.19 2463.06 123.0 94.82 4.15 -4.05 1.56 5566.63 31.36 217.03 -2164.57 -1279.03 4528.82 2513.91 123.0 94.56 3.08 -2.71 2.73 5661.75 28.48 221.09 -2201.43 -1308.85 4611.26 2560.92 123.0 95.12 3.70 -3.03 4.27 5758.13 24.47 227.34 -2232.30 -1338.65 4697.53 2602.80 125.7 96.38 5.06 -4.16 6.48 5851.77 21.11 232.09 -2255.81 -1366.23 4783.86 2637.25 125.7 93.64 4.09 -3.59 5.07 5946.44 18.04 237.39 -2274.19 -1392.04 4873.05 2666.40 128.4 94.67 3.74 -3.24 5.60 6040.98 15.10 245.35 -2287.22 -1415.57 4963.67 2689.80 131.1 94.54 3.92 -3.11 8.42 6135.51 13.29 254.04 -2295.34 -1437.21 5055.32 2708.03 131.1 94.53 2.95 -1.91 9.19 6230.76 13.28 260.90 -2300.08 -1458.54 5148.03 2723.21 131.1 95.25 1.65 -0.01 7.20 6324.96 13.32 263.10 -2303.10 -1479.99 5239.70 2736.98 131.1 94.20 0.54 0.04 2.34 6421.64 13.31 262.66 -2305.86 -1502.09 5333.78 2750.87 125.7 96.68 0.11 -0.01 -0.46 6515.03 13.26 261.67 -2308.78 -1523.35 5424.67 2764.46 131.1 93.39 0.25 -0.05 -1.06 6608.81 13.17 258.91 -2312.40 -1544.47 5515.97 2778.57 133.8 93.78 0.68 -0.10 -2.94 6704.22 13.32 263.79 -2315.68 -1566.07 5608.85 2792.64 139.2 95.41 1.18 0.16 5.11 6799.86 13.25 265.60 -2317.71 -1587.95 5701.93 2805.80 141.9 95.64 0.44 -0.07 1.89 6895.35 13.28 263.32 -2319.82 -1609.75 5794.86 2818.98 141.9 95.49 0.55 0.03 -2.39 6990.85 13.27 263.38 -2322.36 -1631.53 5887.81 2832.52 144.6 95.50 0.02 -0.01 0.06 7089.32 13.27 264.11 -2324.83 -1654.00 5983.66 2846.35 112.2 98.47 0.17 0.00 0.74 7182.98 12.70 263.66 -2327.07 -1674.93 6074.92 2859.18 123.0 93.66 0.62 -0.61 -0.48 7277.38 13.50 264.17 -2329.33 -1696.20 6166.86 2872.22 128.4 94.40 0.86 0.85 0.54 7371.71 13.32 265.19 -2331.36 -1717.98 6258.62 2885.33 133.8 94.33 0.32 -0.19 1.08 7468.87 13.34 266.03 -2333.07 -1740.32 6353.17 2898.45 136.5 97.16 0.20 0.02 0.86 7561.60 13.31 267.94 -2334.20 -1761.66 6443.40 2910.55 139.2 92.73 0.48 -0.03 2.06 7656.50 13.25 263.10 -2335.90 -1783.37 6535.76 2923.33 139.2 94.90 1.17 -0.06 -5.10 7753.01 13.31 264.86 -2338.22 -1805.42 6629.69 2936.82 139.2 96.51 0.42 0.06 1.82 7846.79 13.30 259.72 -2341.11 -1826.78 6720.96 2950.45 136.5 93.78 1.26 -0.01 -5.48 7940.60 13.28 256.27 -2345.60 -1847.87 6812.26 2965.28 139.2 93.81 0.85 -0.02 -3.68 8035.04 13.28 259.98 -2350.06 -1869.09 6904.17 2980.16 141.9 94.44 0.90 0.00 3.93 8129.91 13.30 264.03 -2353.09 -1890.67 6996.51 2994.01 144.6 94.87 0.98 0.02 4.27 Page 4 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797000 Location S13 T10N R12E Well GP-55RD PB1 Wellbore GP-55RD PB1 Rig Spartan 151 Job 110026730 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft 8225.21 13.29 262.55 -2355.65 -1912.43 7089.25 3007.56 147.3 95.30 0.36 -0.01 -1.55 8320.35 13.22 266.06 -2357.82 -1934.13 7181.86 3020.73 147.3 95.14 0.85 -0.07 3.69 8415.56 13.29 262.44 -2360.00 -1955.84 7274.54 3033.93 144.6 95.21 0.87 0.07 -3.80 8510.76 13.32 257.40 -2363.84 -1977.39 7367.18 3048.45 147.3 95.20 1.22 0.03 -5.29 8605.85 13.29 257.68 -2368.56 -1998.76 7459.72 3063.63 150.0 95.09 0.07 -0.03 0.29 8700.32 13.32 258.89 -2372.97 -2020.04 7551.65 3078.51 152.7 94.47 0.30 0.03 1.28 8794.81 13.31 268.78 -2375.30 -2041.60 7643.61 3091.75 152.7 94.49 2.41 -0.01 10.47 8889.39 13.33 272.79 -2375.00 -2063.38 7735.65 3102.86 155.4 94.58 0.98 0.02 4.24 8987.50 13.27 267.91 -2374.86 -2085.93 7831.13 3114.52 152.7 98.11 1.15 -0.06 -4.97 9080.66 13.30 262.89 -2376.58 -2107.25 7921.81 3127.11 155.4 93.16 1.24 0.03 -5.39 9173.80 13.32 261.37 -2379.51 -2128.49 8012.44 3140.70 155.4 93.14 0.38 0.02 -1.63 9268.56 13.52 266.18 -2381.89 -2150.33 8104.62 3154.13 152.7 94.76 1.20 0.21 5.08 9361.75 13.51 268.09 -2382.98 -2172.08 8195.23 3166.41 152.7 93.19 0.48 -0.01 2.05 9458.04 13.46 263.48 -2384.63 -2194.46 8288.87 3179.50 155.4 96.29 1.12 -0.05 -4.79 9551.90 13.50 263.30 -2387.14 -2216.19 8380.14 3192.99 152.7 93.86 0.06 0.04 -0.19 9645.51 13.28 260.51 -2390.19 -2237.65 8471.21 3206.79 152.7 93.61 0.73 -0.24 -2.98 9742.98 13.29 261.11 -2393.77 -2259.76 8566.07 3221.39 155.4 97.47 0.14 0.01 0.62 9835.58 14.04 256.10 -2398.11 -2281.18 8656.05 3236.28 155.4 92.60 1.51 0.81 -5.41 9932.32 16.00 243.12 -2406.96 -2304.47 8749.51 3255.98 155.4 96.74 4.01 2.03 -13.42 10024.68 19.43 229.50 -2422.71 -2327.52 8837.52 3281.45 155.4 92.36 5.80 3.71 -14.75 10117.82 21.50 226.28 -2444.57 -2351.64 8924.78 3312.68 155.4 93.14 2.53 2.22 -3.46 10212.89 24.43 222.66 -2471.07 -2377.56 9012.30 3348.82 158.1 95.07 3.42 3.08 -3.81 10306.41 29.79 215.45 -2504.25 -2404.16 9095.54 3391.01 158.1 93.52 6.71 5.73 -7.71 Projection to TD 10347.00 29.79 215.45 -2520.68 -2415.86 9130.77 3411.13 40.59 0.00 0.00 0.00 Tie Column Legend: I - interpolated tie-point, S - survey station, U - user-defined, T - Surface Page 5 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797100 Location S13 T10N R12E Well GP-55RD PB2 Wellbore GP-55RD PB2 Rig Spartan 151 Job 110026730 Well Origin Latitude 60.958 deg Longitude -151.332 deg North Reference True Drill Depth Zero Rotary Table Vertical Datum is Mean Sea Level Vertical Datum to DDZ 132.00 ft Vertical Section North 0.00 ft Vertical Section East 0.00 ft Vertical Section Azimuth 211.470 deg Vertical Section Depth 0.00 ft Grid Convergence 0.000 deg Magnetic Declination 15.807 deg Total Correction 15.807 deg TVD Calculation Method Minimum Curvature D-Raw Calculation None Local Magnetic Field 55291 nT Local Magnetic Dip Angle 73.836 deg Local Gravity Field 9.820 m/s^2 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft T 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.00 0.00 301.62 0.00 0.00 17.00 0.00 17.00 0.00 0.00 -343.41 42.00 0.02 301.62 0.00 -0.00 42.00 -0.00 25.00 0.08 0.08 0.00 67.00 0.04 301.62 0.01 -0.01 67.00 -0.00 25.00 0.08 0.08 0.00 92.00 0.06 301.62 0.02 -0.03 92.00 -0.00 25.00 0.08 0.08 0.00 117.00 0.09 301.62 0.04 -0.06 117.00 -0.00 25.00 0.12 0.12 0.00 142.00 0.11 301.62 0.06 -0.10 142.00 -0.00 25.00 0.08 0.08 0.00 167.00 0.13 301.62 0.09 -0.14 167.00 -0.00 25.00 0.08 0.08 0.00 192.00 0.15 301.62 0.12 -0.20 192.00 -0.00 25.00 0.08 0.08 0.00 217.00 0.17 301.62 0.16 -0.25 217.00 -0.00 25.00 0.08 0.08 0.00 242.00 0.19 301.62 0.20 -0.32 242.00 -0.00 25.00 0.08 0.08 0.00 267.00 0.21 301.62 0.24 -0.40 267.00 -0.00 25.00 0.08 0.08 0.00 292.00 0.37 340.74 0.34 -0.46 292.00 -0.05 25.00 0.98 0.64 156.48 317.00 0.48 333.70 0.51 -0.53 317.00 -0.16 25.00 0.49 0.44 -28.16 342.00 0.51 331.04 0.71 -0.63 342.00 -0.27 25.00 0.15 0.12 -10.64 367.00 0.55 332.25 0.91 -0.74 367.00 -0.39 25.00 0.17 0.16 4.84 392.00 0.63 328.84 1.13 -0.87 392.00 -0.51 25.00 0.35 0.32 -13.64 417.00 0.61 318.57 1.35 -1.03 416.99 -0.61 25.00 0.45 -0.08 -41.08 442.00 0.58 307.74 1.53 -1.22 441.99 -0.67 25.00 0.46 -0.12 -43.32 467.00 0.70 289.09 1.65 -1.46 466.99 -0.65 25.00 0.96 0.48 -74.60 492.00 0.88 280.94 1.74 -1.80 491.99 -0.55 25.00 0.85 0.72 -32.60 517.00 1.12 266.44 1.76 -2.23 516.98 -0.34 25.00 1.39 0.96 -58.00 542.00 1.27 258.35 1.69 -2.74 541.98 -0.01 25.00 0.90 0.60 -32.36 567.00 1.37 255.30 1.56 -3.30 566.97 0.39 25.00 0.49 0.40 -12.20 592.00 1.47 250.83 1.38 -3.90 591.96 0.86 25.00 0.60 0.40 -17.88 617.00 1.53 243.57 1.12 -4.50 616.96 1.39 25.00 0.80 0.24 -29.04 642.00 1.58 241.45 0.81 -5.10 641.95 1.97 25.00 0.30 0.20 -8.48 667.00 1.61 235.84 0.45 -5.69 666.94 2.59 25.00 0.64 0.12 -22.44 692.00 1.64 233.81 0.04 -6.27 691.93 3.24 25.00 0.26 0.12 -8.12 717.00 1.53 228.41 -0.39 -6.81 716.92 3.89 25.00 0.74 -0.44 -21.60 742.00 1.33 223.04 -0.83 -7.26 741.91 4.49 25.00 0.96 -0.80 -21.48 767.00 1.07 207.45 -1.24 -7.56 766.90 5.01 25.00 1.66 -1.04 -62.36 792.00 0.94 186.73 -1.66 -7.70 791.90 5.43 25.00 1.53 -0.52 -82.88 817.00 0.92 166.48 -2.05 -7.67 816.90 5.76 25.00 1.31 -0.08 -81.00 842.00 1.03 149.04 -2.44 -7.51 841.89 6.00 25.00 1.26 0.44 -69.76 867.00 1.13 145.27 -2.84 -7.25 866.89 6.21 25.00 0.49 0.40 -15.08 892.00 1.14 142.68 -3.24 -6.96 891.88 6.40 25.00 0.21 0.04 -10.36 917.00 1.09 142.44 -3.62 -6.67 916.88 6.57 25.00 0.20 -0.20 -0.96 942.00 1.12 136.72 -3.99 -6.35 941.88 6.72 25.00 0.46 0.12 -22.88 967.00 1.18 135.60 -4.35 -6.01 966.87 6.85 25.00 0.26 0.24 -4.48 992.00 1.14 137.32 -4.72 -5.66 991.87 6.98 25.00 0.21 -0.16 6.88 1017.00 1.10 134.02 -5.07 -5.32 1016.86 7.10 25.00 0.30 -0.16 -13.20 1042.00 1.13 133.08 -5.40 -4.96 1041.86 7.20 25.00 0.14 0.12 -3.76 1067.00 1.10 134.95 -5.74 -4.61 1066.85 7.31 25.00 0.19 -0.12 7.48 1092.00 1.06 135.20 -6.08 -4.28 1091.85 7.42 25.00 0.16 -0.16 1.00 1117.00 1.10 136.15 -6.41 -3.95 1116.84 7.53 25.00 0.18 0.16 3.80 1142.00 1.07 136.43 -6.75 -3.63 1141.84 7.65 25.00 0.12 -0.12 1.12 1167.00 1.21 128.43 -7.09 -3.26 1166.83 7.75 25.00 0.85 0.56 -32.00 1192.00 1.10 129.99 -7.41 -2.87 1191.83 7.81 25.00 0.46 -0.44 6.24 1217.00 1.11 132.27 -7.72 -2.50 1216.82 7.89 25.00 0.18 0.04 9.12 Page 1 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797100 Location S13 T10N R12E Well GP-55RD PB2 Wellbore GP-55RD PB2 Rig Spartan 151 Job 110026730 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft 1242.00 1.07 137.76 -8.06 -2.17 1241.82 8.01 25.00 0.45 -0.16 21.96 1267.00 1.12 136.12 -8.41 -1.84 1266.81 8.13 25.00 0.24 0.20 -6.56 1292.00 1.23 137.13 -8.78 -1.49 1291.81 8.27 25.00 0.45 0.44 4.04 1317.00 1.19 136.36 -9.17 -1.13 1316.80 8.41 25.00 0.17 -0.16 -3.08 1342.00 1.29 134.86 -9.55 -0.75 1341.80 8.54 25.00 0.42 0.40 -6.00 1367.00 1.22 132.93 -9.93 -0.35 1366.79 8.66 25.00 0.33 -0.28 -7.72 1392.00 1.03 130.48 -10.26 0.01 1391.79 8.74 25.00 0.78 -0.76 -9.80 1417.00 1.05 133.91 -10.56 0.35 1416.78 8.83 25.00 0.26 0.08 13.72 1442.00 1.09 131.30 -10.88 0.69 1441.78 8.92 25.00 0.25 0.16 -10.44 1467.00 1.09 124.83 -11.17 1.06 1466.77 8.97 25.00 0.49 0.00 -25.88 1492.00 1.00 131.98 -11.45 1.42 1491.77 9.03 25.00 0.63 -0.36 28.60 1517.00 1.01 141.27 -11.77 1.72 1516.77 9.14 25.00 0.65 0.04 37.16 1542.00 1.44 159.55 -12.24 1.97 1541.76 9.41 25.00 2.30 1.72 73.12 1567.00 2.58 186.11 -13.09 2.02 1566.74 10.11 25.00 5.77 4.56 106.24 1592.00 3.81 193.65 -14.46 1.76 1591.71 11.41 25.00 5.19 4.92 30.16 1617.00 4.55 196.13 -16.22 1.29 1616.64 13.16 25.00 3.05 2.96 9.92 1642.00 5.22 197.76 -18.25 0.67 1641.55 15.22 25.00 2.74 2.68 6.52 1667.00 5.45 199.33 -20.46 -0.07 1666.44 17.48 25.00 1.09 0.92 6.28 1692.00 5.52 199.95 -22.71 -0.87 1691.32 19.82 25.00 0.37 0.28 2.48 1717.00 5.87 200.98 -25.03 -1.74 1716.20 22.26 25.00 1.46 1.40 4.12 1742.00 6.45 203.37 -27.51 -2.76 1741.06 24.91 25.00 2.54 2.32 9.56 1767.00 7.21 206.49 -30.21 -4.01 1765.88 27.86 25.00 3.38 3.04 12.48 1792.00 8.20 209.03 -33.17 -5.58 1790.65 31.20 25.00 4.19 3.96 10.16 1817.00 9.07 210.08 -36.43 -7.43 1815.37 34.95 25.00 3.54 3.48 4.20 1842.00 10.12 211.33 -40.02 -9.56 1840.02 39.12 25.00 4.28 4.20 5.00 1867.00 11.44 212.77 -43.98 -12.04 1864.58 43.80 25.00 5.39 5.28 5.76 1892.00 12.69 213.12 -48.36 -14.89 1889.03 49.02 25.00 5.01 5.00 1.40 1917.00 13.84 212.91 -53.17 -18.01 1913.36 54.75 25.00 4.60 4.60 -0.84 1942.00 14.92 212.52 -58.40 -21.37 1937.57 60.96 25.00 4.34 4.32 -1.56 1967.00 15.64 212.30 -63.96 -24.90 1961.69 67.55 25.00 2.89 2.88 -0.88 1992.00 16.31 211.95 -69.79 -28.56 1985.72 74.43 25.00 2.71 2.68 -1.40 2017.00 16.61 211.95 -75.80 -32.31 2009.70 81.51 25.00 1.20 1.20 0.00 2042.00 17.06 212.17 -81.93 -36.15 2033.63 88.75 25.00 1.82 1.80 0.88 2067.00 17.85 212.64 -88.26 -40.17 2057.48 96.25 25.00 3.21 3.16 1.88 2092.00 18.63 212.33 -94.86 -44.37 2081.22 104.07 25.00 3.14 3.12 -1.24 2117.00 19.26 212.49 -101.72 -48.72 2104.87 112.19 25.00 2.53 2.52 0.64 2142.00 19.83 212.83 -108.76 -53.23 2128.43 120.55 25.00 2.32 2.28 1.36 2167.00 20.61 213.01 -116.01 -57.93 2151.89 129.19 25.00 3.13 3.12 0.72 2192.00 21.41 213.27 -123.51 -62.83 2175.22 138.15 25.00 3.22 3.20 1.04 2217.00 22.60 213.46 -131.34 -67.98 2198.40 147.51 25.00 4.77 4.76 0.76 2242.00 23.86 213.64 -139.55 -73.43 2221.37 157.36 25.00 5.05 5.04 0.72 2267.00 25.01 213.86 -148.15 -79.18 2244.13 167.70 25.00 4.61 4.60 0.88 2292.00 26.20 214.06 -157.11 -85.21 2266.68 178.49 25.00 4.77 4.76 0.80 2317.00 27.01 213.91 -166.40 -91.47 2289.03 189.68 25.00 3.25 3.24 -0.60 2342.00 27.59 213.85 -175.92 -97.86 2311.25 201.13 25.00 2.32 2.32 -0.24 2367.00 28.35 214.01 -185.65 -104.41 2333.33 212.85 25.00 3.05 3.04 0.64 2392.00 29.15 214.56 -195.58 -111.18 2355.24 224.86 25.00 3.37 3.20 2.20 2417.00 29.72 214.34 -205.71 -118.13 2377.02 237.13 25.00 2.32 2.28 -0.88 2442.00 30.37 214.25 -216.05 -125.18 2398.66 249.63 25.00 2.61 2.60 -0.36 2467.00 31.18 213.61 -226.67 -132.32 2420.14 262.41 25.00 3.49 3.24 -2.56 2492.00 32.14 212.85 -237.64 -139.51 2441.42 275.52 25.00 4.16 3.84 -3.04 2517.00 32.93 212.56 -248.96 -146.78 2462.49 288.96 25.00 3.22 3.16 -1.16 2542.00 33.39 212.18 -260.51 -154.10 2483.42 302.64 25.00 2.02 1.84 -1.52 2567.00 34.44 211.78 -272.34 -161.49 2504.17 316.58 25.00 4.29 4.20 -1.60 2592.00 35.58 211.55 -284.55 -169.01 2524.64 330.93 25.00 4.59 4.56 -0.92 2617.00 36.40 211.25 -297.09 -176.67 2544.87 345.62 25.00 3.35 3.28 -1.20 2642.00 37.08 210.79 -309.90 -184.37 2564.91 360.57 25.00 2.93 2.72 -1.84 2667.00 38.18 209.97 -323.07 -192.09 2584.71 375.83 25.00 4.83 4.40 -3.28 2692.00 39.37 209.25 -336.68 -199.83 2604.20 391.48 25.00 5.09 4.76 -2.88 2717.00 40.60 208.88 -350.72 -207.63 2623.35 407.53 25.00 5.01 4.92 -1.48 Page 2 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797100 Location S13 T10N R12E Well GP-55RD PB2 Wellbore GP-55RD PB2 Rig Spartan 151 Job 110026730 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft 2742.00 41.73 208.97 -365.13 -215.59 2642.17 423.97 25.00 4.53 4.52 0.36 2767.00 42.87 209.36 -379.82 -223.79 2660.66 440.78 25.00 4.68 4.56 1.56 2792.00 44.11 209.79 -394.78 -232.28 2678.80 457.98 25.00 5.10 4.96 1.72 2817.00 44.94 210.18 -409.97 -241.04 2696.62 475.50 25.00 3.50 3.32 1.56 2842.00 45.55 210.50 -425.29 -250.01 2714.22 493.25 25.00 2.60 2.44 1.28 2867.00 46.81 210.81 -440.80 -259.21 2731.53 511.29 25.00 5.12 5.04 1.24 2892.00 48.09 210.96 -456.61 -268.66 2748.44 529.70 25.00 5.14 5.12 0.60 2917.00 48.69 210.99 -472.63 -278.28 2765.04 548.39 25.00 2.40 2.40 0.12 2942.00 48.93 211.25 -488.74 -288.01 2781.50 567.21 25.00 1.24 0.96 1.04 2967.00 49.21 211.19 -504.89 -297.80 2797.88 586.09 25.00 1.13 1.12 -0.24 2992.00 49.08 211.28 -521.06 -307.60 2814.24 605.00 25.00 0.59 -0.52 0.36 3017.00 49.04 211.24 -537.20 -317.40 2830.62 623.89 25.00 0.20 -0.16 -0.16 3042.00 49.19 211.28 -553.36 -327.21 2846.98 642.79 25.00 0.61 0.60 0.16 3067.00 49.31 211.28 -569.55 -337.04 2863.30 661.73 25.00 0.48 0.48 0.00 3092.00 49.38 211.34 -585.75 -346.90 2879.59 680.69 25.00 0.33 0.28 0.24 3117.00 49.43 210.70 -602.02 -356.68 2895.86 699.68 25.00 1.95 0.20 -2.56 3142.00 49.42 209.85 -618.42 -366.25 2912.12 718.66 25.00 2.58 -0.04 -3.40 3167.00 49.82 209.33 -634.98 -375.66 2928.31 737.69 25.00 2.25 1.60 -2.08 3192.00 49.97 209.38 -651.64 -385.03 2944.42 756.80 25.00 0.62 0.60 0.20 3217.00 49.80 209.46 -668.30 -394.42 2960.53 775.91 25.00 0.72 -0.68 0.32 3242.00 49.47 209.24 -684.90 -403.76 2976.72 794.95 25.00 1.48 -1.32 -0.88 3267.00 49.52 209.36 -701.48 -413.06 2992.95 813.94 25.00 0.42 0.20 0.48 3292.00 49.60 209.22 -718.07 -422.37 3009.17 832.95 25.00 0.53 0.32 -0.56 3317.00 49.55 209.42 -734.67 -431.69 3025.38 851.97 25.00 0.64 -0.20 0.80 3342.00 49.50 209.50 -751.22 -441.04 3041.61 870.98 25.00 0.32 -0.20 0.32 3367.00 49.41 209.50 -767.76 -450.40 3057.86 889.96 25.00 0.36 -0.36 0.00 3392.00 49.39 209.57 -784.27 -459.75 3074.13 908.93 25.00 0.23 -0.08 0.28 3417.00 48.89 209.72 -800.71 -469.11 3090.49 927.83 25.00 2.05 -2.00 0.60 3442.00 48.66 209.94 -817.02 -478.46 3106.96 946.63 25.00 1.13 -0.92 0.88 3467.00 48.49 210.01 -833.26 -487.83 3123.50 965.37 25.00 0.71 -0.68 0.28 3492.00 48.68 210.12 -849.48 -497.22 3140.04 984.11 25.00 0.83 0.76 0.44 3517.00 48.97 210.19 -865.75 -506.67 3156.50 1002.92 25.00 1.18 1.16 0.28 3542.00 48.91 210.23 -882.04 -516.16 3172.92 1021.77 25.00 0.27 -0.24 0.16 3567.00 49.00 210.41 -898.32 -525.67 3189.34 1040.62 25.00 0.65 0.36 0.72 3592.00 49.18 210.45 -914.61 -535.24 3205.71 1059.51 25.00 0.73 0.72 0.16 3617.00 49.53 210.46 -930.96 -544.86 3221.99 1078.48 25.00 1.40 1.40 0.04 3642.00 49.81 210.35 -947.40 -554.50 3238.17 1097.53 25.00 1.17 1.12 -0.44 3667.00 49.81 210.35 -963.88 -564.15 3254.31 1116.62 25.00 0.00 0.00 0.00 3692.00 49.72 210.53 -980.34 -573.82 3270.45 1135.71 25.00 0.66 -0.36 0.72 3717.00 49.33 210.58 -996.71 -583.49 3286.68 1154.72 25.00 1.57 -1.56 0.20 3742.00 49.23 210.50 -1013.03 -593.12 3302.99 1173.67 25.00 0.47 -0.40 -0.32 3767.00 49.00 210.57 -1029.31 -602.72 3319.35 1192.56 25.00 0.94 -0.92 0.28 3792.00 49.13 210.72 -1045.56 -612.35 3335.73 1211.45 25.00 0.69 0.52 0.60 3817.00 49.46 210.79 -1061.85 -622.04 3352.04 1230.40 25.00 1.34 1.32 0.28 3842.00 49.59 210.94 -1078.17 -631.80 3368.27 1249.42 25.00 0.69 0.52 0.60 3867.00 49.79 210.79 -1094.53 -641.58 3384.44 1268.48 25.00 0.92 0.80 -0.60 3892.00 49.93 210.96 -1110.94 -651.38 3400.56 1287.59 25.00 0.76 0.56 0.68 3917.00 50.05 210.95 -1127.36 -661.23 3416.63 1306.74 25.00 0.48 0.48 -0.04 3942.00 50.06 210.74 -1143.81 -671.06 3432.68 1325.90 25.00 0.65 0.04 -0.84 3967.00 50.06 210.74 -1160.29 -680.86 3448.73 1345.07 25.00 0.00 0.00 0.00 3992.00 50.18 210.79 -1176.77 -690.67 3464.76 1364.25 25.00 0.50 0.48 0.20 4017.00 50.24 210.65 -1193.29 -700.48 3480.76 1383.46 25.00 0.49 0.24 -0.56 4042.00 50.31 210.60 -1209.83 -710.28 3496.74 1402.69 25.00 0.32 0.28 -0.20 4067.00 50.33 210.67 -1226.39 -720.08 3512.70 1421.92 25.00 0.23 0.08 0.28 4092.00 50.34 210.65 -1242.94 -729.90 3528.66 1441.17 25.00 0.07 0.04 -0.08 4117.00 50.29 210.62 -1259.50 -739.70 3544.62 1460.40 25.00 0.22 -0.20 -0.12 4142.00 50.30 210.59 -1276.05 -749.49 3560.59 1479.64 25.00 0.10 0.04 -0.12 4167.00 50.37 210.55 -1292.62 -759.28 3576.55 1498.88 25.00 0.31 0.28 -0.16 4192.00 50.47 210.49 -1309.22 -769.07 3592.48 1518.14 25.00 0.44 0.40 -0.24 4217.00 50.52 210.42 -1325.85 -778.84 3608.38 1537.43 25.00 0.29 0.20 -0.28 Page 3 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797100 Location S13 T10N R12E Well GP-55RD PB2 Wellbore GP-55RD PB2 Rig Spartan 151 Job 110026730 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft 4242.00 50.32 210.55 -1342.45 -788.62 3624.31 1556.70 25.00 0.89 -0.80 0.52 4267.00 50.47 210.31 -1359.06 -798.37 3640.25 1575.95 25.00 0.95 0.60 -0.96 4292.00 50.49 210.29 -1375.71 -808.10 3656.16 1595.23 25.00 0.10 0.08 -0.08 4317.00 50.45 210.32 -1392.36 -817.83 3672.07 1614.51 25.00 0.18 -0.16 0.12 4342.00 50.46 210.20 -1409.01 -827.55 3687.99 1633.79 25.00 0.37 0.04 -0.48 4367.00 50.56 210.16 -1425.69 -837.25 3703.88 1653.08 25.00 0.42 0.40 -0.16 4392.00 50.58 210.03 -1442.40 -846.93 3719.76 1672.38 25.00 0.41 0.08 -0.52 4417.00 50.72 209.98 -1459.14 -856.60 3735.61 1691.71 25.00 0.58 0.56 -0.20 4442.00 50.60 210.09 -1475.88 -866.27 3751.46 1711.03 25.00 0.59 -0.48 0.44 4467.00 50.61 209.98 -1492.60 -875.94 3767.33 1730.35 25.00 0.34 0.04 -0.44 4492.00 50.62 210.03 -1509.33 -885.61 3783.19 1749.66 25.00 0.16 0.04 0.20 4517.00 50.77 210.03 -1526.08 -895.29 3799.03 1769.00 25.00 0.60 0.60 0.00 4542.00 50.86 209.98 -1542.86 -904.98 3814.82 1788.37 25.00 0.39 0.36 -0.20 4567.00 50.98 209.94 -1559.68 -914.67 3830.58 1807.77 25.00 0.50 0.48 -0.16 4592.00 50.90 209.86 -1576.50 -924.35 3846.34 1827.18 25.00 0.41 -0.32 -0.32 4617.00 50.72 209.81 -1593.31 -933.99 3862.13 1846.55 25.00 0.74 -0.72 -0.20 4642.00 50.77 209.79 -1610.11 -943.61 3877.95 1865.90 25.00 0.21 0.20 -0.08 4667.00 50.80 209.85 -1626.92 -953.24 3893.76 1885.26 25.00 0.22 0.12 0.24 4692.00 50.85 209.73 -1643.74 -962.87 3909.55 1904.63 25.00 0.42 0.20 -0.48 4717.00 50.66 209.66 -1660.55 -972.46 3925.37 1923.98 25.00 0.79 -0.76 -0.28 4742.00 50.48 209.55 -1677.34 -982.00 3941.25 1943.28 25.00 0.80 -0.72 -0.44 4767.00 50.53 209.47 -1694.13 -991.50 3957.15 1962.56 25.00 0.32 0.20 -0.32 4792.00 50.25 209.42 -1710.90 -1000.97 3973.09 1981.81 25.00 1.13 -1.12 -0.20 4817.00 50.24 209.33 -1727.65 -1010.40 3989.07 2001.02 25.00 0.28 -0.04 -0.36 4842.00 50.24 209.38 -1744.40 -1019.82 4005.06 2020.22 25.00 0.15 0.00 0.20 4973.00 50.33 208.36 -1832.65 -1068.47 4088.77 2120.89 131.00 0.60 0.07 -0.78 5023.09 50.09 210.11 -1866.23 -1087.27 4120.83 2159.34 93.2 50.09 2.73 -0.48 3.49 5094.60 48.43 211.42 -1912.79 -1114.97 4167.49 2213.51 106.8 71.51 2.70 -2.32 1.83 5189.82 45.74 212.03 -1972.10 -1151.63 4232.33 2283.25 109.5 95.22 2.86 -2.82 0.64 5283.77 41.47 212.59 -2026.86 -1186.25 4300.34 2348.02 114.9 93.95 4.56 -4.55 0.60 5377.25 37.76 212.97 -2076.97 -1218.50 4372.34 2407.59 120.3 93.48 3.98 -3.97 0.41 5472.07 33.92 214.45 -2123.16 -1249.28 4449.19 2463.06 123.0 94.82 4.15 -4.05 1.56 5566.63 31.36 217.03 -2164.57 -1279.03 4528.82 2513.91 123.0 94.56 3.08 -2.71 2.73 5661.75 28.48 221.09 -2201.43 -1308.85 4611.26 2560.92 123.0 95.12 3.70 -3.03 4.27 5758.13 24.47 227.34 -2232.30 -1338.65 4697.53 2602.80 125.7 96.38 5.06 -4.16 6.48 5851.77 21.11 232.09 -2255.81 -1366.23 4783.86 2637.25 125.7 93.64 4.09 -3.59 5.07 5946.44 18.04 237.39 -2274.19 -1392.04 4873.05 2666.40 128.4 94.67 3.74 -3.24 5.60 6040.98 15.10 245.35 -2287.22 -1415.57 4963.67 2689.80 131.1 94.54 3.92 -3.11 8.42 6135.51 13.29 254.04 -2295.34 -1437.21 5055.32 2708.03 131.1 94.53 2.95 -1.91 9.19 6230.76 13.28 260.90 -2300.08 -1458.54 5148.03 2723.21 131.1 95.25 1.65 -0.01 7.20 6324.96 13.32 263.10 -2303.10 -1479.99 5239.70 2736.98 131.1 94.20 0.54 0.04 2.34 6421.64 13.31 262.66 -2305.86 -1502.09 5333.78 2750.87 125.7 96.68 0.11 -0.01 -0.46 6515.03 13.26 261.67 -2308.78 -1523.35 5424.67 2764.46 131.1 93.39 0.25 -0.05 -1.06 6608.81 13.17 258.91 -2312.40 -1544.47 5515.97 2778.57 133.8 93.78 0.68 -0.10 -2.94 6704.22 13.32 263.79 -2315.68 -1566.07 5608.85 2792.64 139.2 95.41 1.18 0.16 5.11 6799.86 13.25 265.60 -2317.71 -1587.95 5701.93 2805.80 141.9 95.64 0.44 -0.07 1.89 6895.35 13.28 263.32 -2319.82 -1609.75 5794.86 2818.98 141.9 95.49 0.55 0.03 -2.39 6990.85 13.27 263.38 -2322.36 -1631.53 5887.81 2832.52 144.6 95.50 0.02 -0.01 0.06 7089.32 13.27 264.11 -2324.83 -1654.00 5983.66 2846.35 112.2 98.47 0.17 0.00 0.74 7182.98 12.70 263.66 -2327.07 -1674.93 6074.92 2859.18 123.0 93.66 0.62 -0.61 -0.48 7277.38 13.50 264.17 -2329.33 -1696.20 6166.86 2872.22 128.4 94.40 0.86 0.85 0.54 7371.71 13.32 265.19 -2331.36 -1717.98 6258.62 2885.33 133.8 94.33 0.32 -0.19 1.08 7468.87 13.34 266.03 -2333.07 -1740.32 6353.17 2898.45 136.5 97.16 0.20 0.02 0.86 7561.60 13.31 267.94 -2334.20 -1761.66 6443.40 2910.55 139.2 92.73 0.48 -0.03 2.06 7656.50 13.25 263.10 -2335.90 -1783.37 6535.76 2923.33 139.2 94.90 1.17 -0.06 -5.10 7753.01 13.31 264.86 -2338.22 -1805.42 6629.69 2936.82 139.2 96.51 0.42 0.06 1.82 7846.79 13.30 259.72 -2341.11 -1826.78 6720.96 2950.45 136.5 93.78 1.26 -0.01 -5.48 7940.60 13.28 256.27 -2345.60 -1847.87 6812.26 2965.28 139.2 93.81 0.85 -0.02 -3.68 8035.04 13.28 259.98 -2350.06 -1869.09 6904.17 2980.16 141.9 94.44 0.90 0.00 3.93 8129.91 13.30 264.03 -2353.09 -1890.67 6996.51 2994.01 144.6 94.87 0.98 0.02 4.27 Page 4 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797100 Location S13 T10N R12E Well GP-55RD PB2 Wellbore GP-55RD PB2 Rig Spartan 151 Job 110026730 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft 8225.21 13.29 262.55 -2355.65 -1912.43 7089.25 3007.56 147.3 95.30 0.36 -0.01 -1.55 8320.35 13.22 266.06 -2357.82 -1934.13 7181.86 3020.73 147.3 95.14 0.85 -0.07 3.69 8415.56 13.29 262.44 -2360.00 -1955.84 7274.54 3033.93 144.6 95.21 0.87 0.07 -3.80 8510.76 13.32 257.40 -2363.84 -1977.39 7367.18 3048.45 147.3 95.20 1.22 0.03 -5.29 8605.85 13.29 257.68 -2368.56 -1998.76 7459.72 3063.63 150.0 95.09 0.07 -0.03 0.29 8700.32 13.32 258.89 -2372.97 -2020.04 7551.65 3078.51 152.7 94.47 0.30 0.03 1.28 8794.81 13.31 268.78 -2375.30 -2041.60 7643.61 3091.75 152.7 94.49 2.41 -0.01 10.47 8889.39 13.33 272.79 -2375.00 -2063.38 7735.65 3102.86 155.4 94.58 0.98 0.02 4.24 8987.50 13.27 267.91 -2374.86 -2085.93 7831.13 3114.52 152.7 98.11 1.15 -0.06 -4.97 9080.66 13.30 262.89 -2376.58 -2107.25 7921.81 3127.11 155.4 93.16 1.24 0.03 -5.39 9173.80 13.32 261.37 -2379.51 -2128.49 8012.44 3140.70 155.4 93.14 0.38 0.02 -1.63 9268.56 13.52 266.18 -2381.89 -2150.33 8104.62 3154.13 152.7 94.76 1.20 0.21 5.08 9361.75 13.51 268.09 -2382.98 -2172.08 8195.23 3166.41 152.7 93.19 0.48 -0.01 2.05 9458.04 13.46 263.48 -2384.63 -2194.46 8288.87 3179.50 155.4 96.29 1.12 -0.05 -4.79 9551.90 13.50 263.30 -2387.14 -2216.19 8380.14 3192.99 152.7 93.86 0.06 0.04 -0.19 9645.51 13.28 260.51 -2390.19 -2237.65 8471.21 3206.79 152.7 93.61 0.73 -0.24 -2.98 9742.98 13.29 261.11 -2393.77 -2259.76 8566.07 3221.39 155.4 97.47 0.14 0.01 0.62 I 9813.00 13.85 257.27 -2396.86 -2275.88 8634.14 3232.44 70.02 1.51 0.80 -5.48 9858.36 11.21 272.68 -2397.85 -2285.59 8678.43 3238.35 141.9 45.36 9.34 -5.82 33.97 9929.93 10.46 278.88 -2396.52 -2298.95 8748.72 3244.20 141.9 71.57 1.93 -1.05 8.66 10025.24 15.58 260.72 -2397.25 -2320.16 8841.58 3255.89 141.9 95.31 6.82 5.37 -19.05 10119.61 19.88 245.82 -2405.88 -2347.33 8931.50 3277.43 144.6 94.37 6.59 4.56 -15.79 10216.33 21.41 243.33 -2420.54 -2378.11 9022.01 3306.00 131.1 96.72 1.82 1.58 -2.57 10310.03 21.87 243.64 -2435.96 -2409.03 9109.10 3335.30 133.8 93.70 0.51 0.49 0.33 10395.00 21.89 245.57 -2449.54 -2437.63 9187.95 3361.81 133.8 84.97 0.85 0.02 2.27 10491.00 26.88 240.40 -2467.67 -2472.82 9275.37 3395.65 147.3 96.00 5.65 5.20 -5.39 10584.09 25.07 241.43 -2487.50 -2508.44 9359.05 3431.16 131.1 93.09 2.00 -1.94 1.11 Projection to TD 10717.00 25.07 241.43 -2514.43 -2557.90 9479.44 3479.95 132.91 0.00 -0.00 0.00 Tie Column Legend: I - interpolated tie-point, S - survey station, U - user-defined, T - Surface Page 5 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797200 Location S13 T10N R12E Well GP-55RD PB3 Wellbore GP-55RD PB3 Rig Spartan 151 Job 110026730 Well Origin Latitude 60.958 deg Longitude -151.332 deg North Reference True Drill Depth Zero Rotary Table Vertical Datum is Mean Sea Level Vertical Datum to DDZ 132.00 ft Vertical Section North 0.00 ft Vertical Section East 0.00 ft Vertical Section Azimuth 211.470 deg Vertical Section Depth 0.00 ft Grid Convergence 0.000 deg Magnetic Declination 15.807 deg Total Correction 15.807 deg TVD Calculation Method Minimum Curvature D-Raw Calculation None Local Magnetic Field 55291 nT Local Magnetic Dip Angle 73.836 deg Local Gravity Field 9.820 m/s^2 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft T 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.00 0.00 301.62 0.00 0.00 17.00 0.00 17.00 0.00 0.00 -343.41 42.00 0.02 301.62 0.00 -0.00 42.00 -0.00 25.00 0.08 0.08 0.00 67.00 0.04 301.62 0.01 -0.01 67.00 -0.00 25.00 0.08 0.08 0.00 92.00 0.06 301.62 0.02 -0.03 92.00 -0.00 25.00 0.08 0.08 0.00 117.00 0.09 301.62 0.04 -0.06 117.00 -0.00 25.00 0.12 0.12 0.00 142.00 0.11 301.62 0.06 -0.10 142.00 -0.00 25.00 0.08 0.08 0.00 167.00 0.13 301.62 0.09 -0.14 167.00 -0.00 25.00 0.08 0.08 0.00 192.00 0.15 301.62 0.12 -0.20 192.00 -0.00 25.00 0.08 0.08 0.00 217.00 0.17 301.62 0.16 -0.25 217.00 -0.00 25.00 0.08 0.08 0.00 242.00 0.19 301.62 0.20 -0.32 242.00 -0.00 25.00 0.08 0.08 0.00 267.00 0.21 301.62 0.24 -0.40 267.00 -0.00 25.00 0.08 0.08 0.00 292.00 0.37 340.74 0.34 -0.46 292.00 -0.05 25.00 0.98 0.64 156.48 317.00 0.48 333.70 0.51 -0.53 317.00 -0.16 25.00 0.49 0.44 -28.16 342.00 0.51 331.04 0.71 -0.63 342.00 -0.27 25.00 0.15 0.12 -10.64 367.00 0.55 332.25 0.91 -0.74 367.00 -0.39 25.00 0.17 0.16 4.84 392.00 0.63 328.84 1.13 -0.87 392.00 -0.51 25.00 0.35 0.32 -13.64 417.00 0.61 318.57 1.35 -1.03 416.99 -0.61 25.00 0.45 -0.08 -41.08 442.00 0.58 307.74 1.53 -1.22 441.99 -0.67 25.00 0.46 -0.12 -43.32 467.00 0.70 289.09 1.65 -1.46 466.99 -0.65 25.00 0.96 0.48 -74.60 492.00 0.88 280.94 1.74 -1.80 491.99 -0.55 25.00 0.85 0.72 -32.60 517.00 1.12 266.44 1.76 -2.23 516.98 -0.34 25.00 1.39 0.96 -58.00 542.00 1.27 258.35 1.69 -2.74 541.98 -0.01 25.00 0.90 0.60 -32.36 567.00 1.37 255.30 1.56 -3.30 566.97 0.39 25.00 0.49 0.40 -12.20 592.00 1.47 250.83 1.38 -3.90 591.96 0.86 25.00 0.60 0.40 -17.88 617.00 1.53 243.57 1.12 -4.50 616.96 1.39 25.00 0.80 0.24 -29.04 642.00 1.58 241.45 0.81 -5.10 641.95 1.97 25.00 0.30 0.20 -8.48 667.00 1.61 235.84 0.45 -5.69 666.94 2.59 25.00 0.64 0.12 -22.44 692.00 1.64 233.81 0.04 -6.27 691.93 3.24 25.00 0.26 0.12 -8.12 717.00 1.53 228.41 -0.39 -6.81 716.92 3.89 25.00 0.74 -0.44 -21.60 742.00 1.33 223.04 -0.83 -7.26 741.91 4.49 25.00 0.96 -0.80 -21.48 767.00 1.07 207.45 -1.24 -7.56 766.90 5.01 25.00 1.66 -1.04 -62.36 792.00 0.94 186.73 -1.66 -7.70 791.90 5.43 25.00 1.53 -0.52 -82.88 817.00 0.92 166.48 -2.05 -7.67 816.90 5.76 25.00 1.31 -0.08 -81.00 842.00 1.03 149.04 -2.44 -7.51 841.89 6.00 25.00 1.26 0.44 -69.76 867.00 1.13 145.27 -2.84 -7.25 866.89 6.21 25.00 0.49 0.40 -15.08 892.00 1.14 142.68 -3.24 -6.96 891.88 6.40 25.00 0.21 0.04 -10.36 917.00 1.09 142.44 -3.62 -6.67 916.88 6.57 25.00 0.20 -0.20 -0.96 942.00 1.12 136.72 -3.99 -6.35 941.88 6.72 25.00 0.46 0.12 -22.88 967.00 1.18 135.60 -4.35 -6.01 966.87 6.85 25.00 0.26 0.24 -4.48 992.00 1.14 137.32 -4.72 -5.66 991.87 6.98 25.00 0.21 -0.16 6.88 1017.00 1.10 134.02 -5.07 -5.32 1016.86 7.10 25.00 0.30 -0.16 -13.20 1042.00 1.13 133.08 -5.40 -4.96 1041.86 7.20 25.00 0.14 0.12 -3.76 1067.00 1.10 134.95 -5.74 -4.61 1066.85 7.31 25.00 0.19 -0.12 7.48 1092.00 1.06 135.20 -6.08 -4.28 1091.85 7.42 25.00 0.16 -0.16 1.00 1117.00 1.10 136.15 -6.41 -3.95 1116.84 7.53 25.00 0.18 0.16 3.80 1142.00 1.07 136.43 -6.75 -3.63 1141.84 7.65 25.00 0.12 -0.12 1.12 1167.00 1.21 128.43 -7.09 -3.26 1166.83 7.75 25.00 0.85 0.56 -32.00 1192.00 1.10 129.99 -7.41 -2.87 1191.83 7.81 25.00 0.46 -0.44 6.24 1217.00 1.11 132.27 -7.72 -2.50 1216.82 7.89 25.00 0.18 0.04 9.12 Page 1 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797200 Location S13 T10N R12E Well GP-55RD PB3 Wellbore GP-55RD PB3 Rig Spartan 151 Job 110026730 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft 1242.00 1.07 137.76 -8.06 -2.17 1241.82 8.01 25.00 0.45 -0.16 21.96 1267.00 1.12 136.12 -8.41 -1.84 1266.81 8.13 25.00 0.24 0.20 -6.56 1292.00 1.23 137.13 -8.78 -1.49 1291.81 8.27 25.00 0.45 0.44 4.04 1317.00 1.19 136.36 -9.17 -1.13 1316.80 8.41 25.00 0.17 -0.16 -3.08 1342.00 1.29 134.86 -9.55 -0.75 1341.80 8.54 25.00 0.42 0.40 -6.00 1367.00 1.22 132.93 -9.93 -0.35 1366.79 8.66 25.00 0.33 -0.28 -7.72 1392.00 1.03 130.48 -10.26 0.01 1391.79 8.74 25.00 0.78 -0.76 -9.80 1417.00 1.05 133.91 -10.56 0.35 1416.78 8.83 25.00 0.26 0.08 13.72 1442.00 1.09 131.30 -10.88 0.69 1441.78 8.92 25.00 0.25 0.16 -10.44 1467.00 1.09 124.83 -11.17 1.06 1466.77 8.97 25.00 0.49 0.00 -25.88 1492.00 1.00 131.98 -11.45 1.42 1491.77 9.03 25.00 0.63 -0.36 28.60 1517.00 1.01 141.27 -11.77 1.72 1516.77 9.14 25.00 0.65 0.04 37.16 1542.00 1.44 159.55 -12.24 1.97 1541.76 9.41 25.00 2.30 1.72 73.12 1567.00 2.58 186.11 -13.09 2.02 1566.74 10.11 25.00 5.77 4.56 106.24 1592.00 3.81 193.65 -14.46 1.76 1591.71 11.41 25.00 5.19 4.92 30.16 1617.00 4.55 196.13 -16.22 1.29 1616.64 13.16 25.00 3.05 2.96 9.92 1642.00 5.22 197.76 -18.25 0.67 1641.55 15.22 25.00 2.74 2.68 6.52 1667.00 5.45 199.33 -20.46 -0.07 1666.44 17.48 25.00 1.09 0.92 6.28 1692.00 5.52 199.95 -22.71 -0.87 1691.32 19.82 25.00 0.37 0.28 2.48 1717.00 5.87 200.98 -25.03 -1.74 1716.20 22.26 25.00 1.46 1.40 4.12 1742.00 6.45 203.37 -27.51 -2.76 1741.06 24.91 25.00 2.54 2.32 9.56 1767.00 7.21 206.49 -30.21 -4.01 1765.88 27.86 25.00 3.38 3.04 12.48 1792.00 8.20 209.03 -33.17 -5.58 1790.65 31.20 25.00 4.19 3.96 10.16 1817.00 9.07 210.08 -36.43 -7.43 1815.37 34.95 25.00 3.54 3.48 4.20 1842.00 10.12 211.33 -40.02 -9.56 1840.02 39.12 25.00 4.28 4.20 5.00 1867.00 11.44 212.77 -43.98 -12.04 1864.58 43.80 25.00 5.39 5.28 5.76 1892.00 12.69 213.12 -48.36 -14.89 1889.03 49.02 25.00 5.01 5.00 1.40 1917.00 13.84 212.91 -53.17 -18.01 1913.36 54.75 25.00 4.60 4.60 -0.84 1942.00 14.92 212.52 -58.40 -21.37 1937.57 60.96 25.00 4.34 4.32 -1.56 1967.00 15.64 212.30 -63.96 -24.90 1961.69 67.55 25.00 2.89 2.88 -0.88 1992.00 16.31 211.95 -69.79 -28.56 1985.72 74.43 25.00 2.71 2.68 -1.40 2017.00 16.61 211.95 -75.80 -32.31 2009.70 81.51 25.00 1.20 1.20 0.00 2042.00 17.06 212.17 -81.93 -36.15 2033.63 88.75 25.00 1.82 1.80 0.88 2067.00 17.85 212.64 -88.26 -40.17 2057.48 96.25 25.00 3.21 3.16 1.88 2092.00 18.63 212.33 -94.86 -44.37 2081.22 104.07 25.00 3.14 3.12 -1.24 2117.00 19.26 212.49 -101.72 -48.72 2104.87 112.19 25.00 2.53 2.52 0.64 2142.00 19.83 212.83 -108.76 -53.23 2128.43 120.55 25.00 2.32 2.28 1.36 2167.00 20.61 213.01 -116.01 -57.93 2151.89 129.19 25.00 3.13 3.12 0.72 2192.00 21.41 213.27 -123.51 -62.83 2175.22 138.15 25.00 3.22 3.20 1.04 2217.00 22.60 213.46 -131.34 -67.98 2198.40 147.51 25.00 4.77 4.76 0.76 2242.00 23.86 213.64 -139.55 -73.43 2221.37 157.36 25.00 5.05 5.04 0.72 2267.00 25.01 213.86 -148.15 -79.18 2244.13 167.70 25.00 4.61 4.60 0.88 2292.00 26.20 214.06 -157.11 -85.21 2266.68 178.49 25.00 4.77 4.76 0.80 2317.00 27.01 213.91 -166.40 -91.47 2289.03 189.68 25.00 3.25 3.24 -0.60 2342.00 27.59 213.85 -175.92 -97.86 2311.25 201.13 25.00 2.32 2.32 -0.24 2367.00 28.35 214.01 -185.65 -104.41 2333.33 212.85 25.00 3.05 3.04 0.64 2392.00 29.15 214.56 -195.58 -111.18 2355.24 224.86 25.00 3.37 3.20 2.20 2417.00 29.72 214.34 -205.71 -118.13 2377.02 237.13 25.00 2.32 2.28 -0.88 2442.00 30.37 214.25 -216.05 -125.18 2398.66 249.63 25.00 2.61 2.60 -0.36 2467.00 31.18 213.61 -226.67 -132.32 2420.14 262.41 25.00 3.49 3.24 -2.56 2492.00 32.14 212.85 -237.64 -139.51 2441.42 275.52 25.00 4.16 3.84 -3.04 2517.00 32.93 212.56 -248.96 -146.78 2462.49 288.96 25.00 3.22 3.16 -1.16 2542.00 33.39 212.18 -260.51 -154.10 2483.42 302.64 25.00 2.02 1.84 -1.52 2567.00 34.44 211.78 -272.34 -161.49 2504.17 316.58 25.00 4.29 4.20 -1.60 2592.00 35.58 211.55 -284.55 -169.01 2524.64 330.93 25.00 4.59 4.56 -0.92 2617.00 36.40 211.25 -297.09 -176.67 2544.87 345.62 25.00 3.35 3.28 -1.20 2642.00 37.08 210.79 -309.90 -184.37 2564.91 360.57 25.00 2.93 2.72 -1.84 2667.00 38.18 209.97 -323.07 -192.09 2584.71 375.83 25.00 4.83 4.40 -3.28 2692.00 39.37 209.25 -336.68 -199.83 2604.20 391.48 25.00 5.09 4.76 -2.88 2717.00 40.60 208.88 -350.72 -207.63 2623.35 407.53 25.00 5.01 4.92 -1.48 Page 2 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797200 Location S13 T10N R12E Well GP-55RD PB3 Wellbore GP-55RD PB3 Rig Spartan 151 Job 110026730 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft 2742.00 41.73 208.97 -365.13 -215.59 2642.17 423.97 25.00 4.53 4.52 0.36 2767.00 42.87 209.36 -379.82 -223.79 2660.66 440.78 25.00 4.68 4.56 1.56 2792.00 44.11 209.79 -394.78 -232.28 2678.80 457.98 25.00 5.10 4.96 1.72 2817.00 44.94 210.18 -409.97 -241.04 2696.62 475.50 25.00 3.50 3.32 1.56 2842.00 45.55 210.50 -425.29 -250.01 2714.22 493.25 25.00 2.60 2.44 1.28 2867.00 46.81 210.81 -440.80 -259.21 2731.53 511.29 25.00 5.12 5.04 1.24 2892.00 48.09 210.96 -456.61 -268.66 2748.44 529.70 25.00 5.14 5.12 0.60 2917.00 48.69 210.99 -472.63 -278.28 2765.04 548.39 25.00 2.40 2.40 0.12 2942.00 48.93 211.25 -488.74 -288.01 2781.50 567.21 25.00 1.24 0.96 1.04 2967.00 49.21 211.19 -504.89 -297.80 2797.88 586.09 25.00 1.13 1.12 -0.24 2992.00 49.08 211.28 -521.06 -307.60 2814.24 605.00 25.00 0.59 -0.52 0.36 3017.00 49.04 211.24 -537.20 -317.40 2830.62 623.89 25.00 0.20 -0.16 -0.16 3042.00 49.19 211.28 -553.36 -327.21 2846.98 642.79 25.00 0.61 0.60 0.16 3067.00 49.31 211.28 -569.55 -337.04 2863.30 661.73 25.00 0.48 0.48 0.00 3092.00 49.38 211.34 -585.75 -346.90 2879.59 680.69 25.00 0.33 0.28 0.24 3117.00 49.43 210.70 -602.02 -356.68 2895.86 699.68 25.00 1.95 0.20 -2.56 3142.00 49.42 209.85 -618.42 -366.25 2912.12 718.66 25.00 2.58 -0.04 -3.40 3167.00 49.82 209.33 -634.98 -375.66 2928.31 737.69 25.00 2.25 1.60 -2.08 3192.00 49.97 209.38 -651.64 -385.03 2944.42 756.80 25.00 0.62 0.60 0.20 3217.00 49.80 209.46 -668.30 -394.42 2960.53 775.91 25.00 0.72 -0.68 0.32 3242.00 49.47 209.24 -684.90 -403.76 2976.72 794.95 25.00 1.48 -1.32 -0.88 3267.00 49.52 209.36 -701.48 -413.06 2992.95 813.94 25.00 0.42 0.20 0.48 3292.00 49.60 209.22 -718.07 -422.37 3009.17 832.95 25.00 0.53 0.32 -0.56 3317.00 49.55 209.42 -734.67 -431.69 3025.38 851.97 25.00 0.64 -0.20 0.80 3342.00 49.50 209.50 -751.22 -441.04 3041.61 870.98 25.00 0.32 -0.20 0.32 3367.00 49.41 209.50 -767.76 -450.40 3057.86 889.96 25.00 0.36 -0.36 0.00 3392.00 49.39 209.57 -784.27 -459.75 3074.13 908.93 25.00 0.23 -0.08 0.28 3417.00 48.89 209.72 -800.71 -469.11 3090.49 927.83 25.00 2.05 -2.00 0.60 3442.00 48.66 209.94 -817.02 -478.46 3106.96 946.63 25.00 1.13 -0.92 0.88 3467.00 48.49 210.01 -833.26 -487.83 3123.50 965.37 25.00 0.71 -0.68 0.28 3492.00 48.68 210.12 -849.48 -497.22 3140.04 984.11 25.00 0.83 0.76 0.44 3517.00 48.97 210.19 -865.75 -506.67 3156.50 1002.92 25.00 1.18 1.16 0.28 3542.00 48.91 210.23 -882.04 -516.16 3172.92 1021.77 25.00 0.27 -0.24 0.16 3567.00 49.00 210.41 -898.32 -525.67 3189.34 1040.62 25.00 0.65 0.36 0.72 3592.00 49.18 210.45 -914.61 -535.24 3205.71 1059.51 25.00 0.73 0.72 0.16 3617.00 49.53 210.46 -930.96 -544.86 3221.99 1078.48 25.00 1.40 1.40 0.04 3642.00 49.81 210.35 -947.40 -554.50 3238.17 1097.53 25.00 1.17 1.12 -0.44 3667.00 49.81 210.35 -963.88 -564.15 3254.31 1116.62 25.00 0.00 0.00 0.00 3692.00 49.72 210.53 -980.34 -573.82 3270.45 1135.71 25.00 0.66 -0.36 0.72 3717.00 49.33 210.58 -996.71 -583.49 3286.68 1154.72 25.00 1.57 -1.56 0.20 3742.00 49.23 210.50 -1013.03 -593.12 3302.99 1173.67 25.00 0.47 -0.40 -0.32 3767.00 49.00 210.57 -1029.31 -602.72 3319.35 1192.56 25.00 0.94 -0.92 0.28 3792.00 49.13 210.72 -1045.56 -612.35 3335.73 1211.45 25.00 0.69 0.52 0.60 3817.00 49.46 210.79 -1061.85 -622.04 3352.04 1230.40 25.00 1.34 1.32 0.28 3842.00 49.59 210.94 -1078.17 -631.80 3368.27 1249.42 25.00 0.69 0.52 0.60 3867.00 49.79 210.79 -1094.53 -641.58 3384.44 1268.48 25.00 0.92 0.80 -0.60 3892.00 49.93 210.96 -1110.94 -651.38 3400.56 1287.59 25.00 0.76 0.56 0.68 3917.00 50.05 210.95 -1127.36 -661.23 3416.63 1306.74 25.00 0.48 0.48 -0.04 3942.00 50.06 210.74 -1143.81 -671.06 3432.68 1325.90 25.00 0.65 0.04 -0.84 3967.00 50.06 210.74 -1160.29 -680.86 3448.73 1345.07 25.00 0.00 0.00 0.00 3992.00 50.18 210.79 -1176.77 -690.67 3464.76 1364.25 25.00 0.50 0.48 0.20 4017.00 50.24 210.65 -1193.29 -700.48 3480.76 1383.46 25.00 0.49 0.24 -0.56 4042.00 50.31 210.60 -1209.83 -710.28 3496.74 1402.69 25.00 0.32 0.28 -0.20 4067.00 50.33 210.67 -1226.39 -720.08 3512.70 1421.92 25.00 0.23 0.08 0.28 4092.00 50.34 210.65 -1242.94 -729.90 3528.66 1441.17 25.00 0.07 0.04 -0.08 4117.00 50.29 210.62 -1259.50 -739.70 3544.62 1460.40 25.00 0.22 -0.20 -0.12 4142.00 50.30 210.59 -1276.05 -749.49 3560.59 1479.64 25.00 0.10 0.04 -0.12 4167.00 50.37 210.55 -1292.62 -759.28 3576.55 1498.88 25.00 0.31 0.28 -0.16 4192.00 50.47 210.49 -1309.22 -769.07 3592.48 1518.14 25.00 0.44 0.40 -0.24 4217.00 50.52 210.42 -1325.85 -778.84 3608.38 1537.43 25.00 0.29 0.20 -0.28 Page 3 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797200 Location S13 T10N R12E Well GP-55RD PB3 Wellbore GP-55RD PB3 Rig Spartan 151 Job 110026730 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft 4242.00 50.32 210.55 -1342.45 -788.62 3624.31 1556.70 25.00 0.89 -0.80 0.52 4267.00 50.47 210.31 -1359.06 -798.37 3640.25 1575.95 25.00 0.95 0.60 -0.96 4292.00 50.49 210.29 -1375.71 -808.10 3656.16 1595.23 25.00 0.10 0.08 -0.08 4317.00 50.45 210.32 -1392.36 -817.83 3672.07 1614.51 25.00 0.18 -0.16 0.12 4342.00 50.46 210.20 -1409.01 -827.55 3687.99 1633.79 25.00 0.37 0.04 -0.48 4367.00 50.56 210.16 -1425.69 -837.25 3703.88 1653.08 25.00 0.42 0.40 -0.16 4392.00 50.58 210.03 -1442.40 -846.93 3719.76 1672.38 25.00 0.41 0.08 -0.52 4417.00 50.72 209.98 -1459.14 -856.60 3735.61 1691.71 25.00 0.58 0.56 -0.20 4442.00 50.60 210.09 -1475.88 -866.27 3751.46 1711.03 25.00 0.59 -0.48 0.44 4467.00 50.61 209.98 -1492.60 -875.94 3767.33 1730.35 25.00 0.34 0.04 -0.44 4492.00 50.62 210.03 -1509.33 -885.61 3783.19 1749.66 25.00 0.16 0.04 0.20 4517.00 50.77 210.03 -1526.08 -895.29 3799.03 1769.00 25.00 0.60 0.60 0.00 4542.00 50.86 209.98 -1542.86 -904.98 3814.82 1788.37 25.00 0.39 0.36 -0.20 4567.00 50.98 209.94 -1559.68 -914.67 3830.58 1807.77 25.00 0.50 0.48 -0.16 4592.00 50.90 209.86 -1576.50 -924.35 3846.34 1827.18 25.00 0.41 -0.32 -0.32 4617.00 50.72 209.81 -1593.31 -933.99 3862.13 1846.55 25.00 0.74 -0.72 -0.20 4642.00 50.77 209.79 -1610.11 -943.61 3877.95 1865.90 25.00 0.21 0.20 -0.08 4667.00 50.80 209.85 -1626.92 -953.24 3893.76 1885.26 25.00 0.22 0.12 0.24 4692.00 50.85 209.73 -1643.74 -962.87 3909.55 1904.63 25.00 0.42 0.20 -0.48 4717.00 50.66 209.66 -1660.55 -972.46 3925.37 1923.98 25.00 0.79 -0.76 -0.28 4742.00 50.48 209.55 -1677.34 -982.00 3941.25 1943.28 25.00 0.80 -0.72 -0.44 4767.00 50.53 209.47 -1694.13 -991.50 3957.15 1962.56 25.00 0.32 0.20 -0.32 4792.00 50.25 209.42 -1710.90 -1000.97 3973.09 1981.81 25.00 1.13 -1.12 -0.20 4817.00 50.24 209.33 -1727.65 -1010.40 3989.07 2001.02 25.00 0.28 -0.04 -0.36 4842.00 50.24 209.38 -1744.40 -1019.82 4005.06 2020.22 25.00 0.15 0.00 0.20 4973.00 50.33 208.36 -1832.65 -1068.47 4088.77 2120.89 131.00 0.60 0.07 -0.78 5023.09 50.09 210.11 -1866.23 -1087.27 4120.83 2159.34 93.2 50.09 2.73 -0.48 3.49 5094.60 48.43 211.42 -1912.79 -1114.97 4167.49 2213.51 106.8 71.51 2.70 -2.32 1.83 5189.82 45.74 212.03 -1972.10 -1151.63 4232.33 2283.25 109.5 95.22 2.86 -2.82 0.64 5283.77 41.47 212.59 -2026.86 -1186.25 4300.34 2348.02 114.9 93.95 4.56 -4.55 0.60 5377.25 37.76 212.97 -2076.97 -1218.50 4372.34 2407.59 120.3 93.48 3.98 -3.97 0.41 5472.07 33.92 214.45 -2123.16 -1249.28 4449.19 2463.06 123.0 94.82 4.15 -4.05 1.56 5566.63 31.36 217.03 -2164.57 -1279.03 4528.82 2513.91 123.0 94.56 3.08 -2.71 2.73 5661.75 28.48 221.09 -2201.43 -1308.85 4611.26 2560.92 123.0 95.12 3.70 -3.03 4.27 5758.13 24.47 227.34 -2232.30 -1338.65 4697.53 2602.80 125.7 96.38 5.06 -4.16 6.48 5851.77 21.11 232.09 -2255.81 -1366.23 4783.86 2637.25 125.7 93.64 4.09 -3.59 5.07 5946.44 18.04 237.39 -2274.19 -1392.04 4873.05 2666.40 128.4 94.67 3.74 -3.24 5.60 6040.98 15.10 245.35 -2287.22 -1415.57 4963.67 2689.80 131.1 94.54 3.92 -3.11 8.42 6135.51 13.29 254.04 -2295.34 -1437.21 5055.32 2708.03 131.1 94.53 2.95 -1.91 9.19 6230.76 13.28 260.90 -2300.08 -1458.54 5148.03 2723.21 131.1 95.25 1.65 -0.01 7.20 6324.96 13.32 263.10 -2303.10 -1479.99 5239.70 2736.98 131.1 94.20 0.54 0.04 2.34 6421.64 13.31 262.66 -2305.86 -1502.09 5333.78 2750.87 125.7 96.68 0.11 -0.01 -0.46 6515.03 13.26 261.67 -2308.78 -1523.35 5424.67 2764.46 131.1 93.39 0.25 -0.05 -1.06 6608.81 13.17 258.91 -2312.40 -1544.47 5515.97 2778.57 133.8 93.78 0.68 -0.10 -2.94 6704.22 13.32 263.79 -2315.68 -1566.07 5608.85 2792.64 139.2 95.41 1.18 0.16 5.11 6799.86 13.25 265.60 -2317.71 -1587.95 5701.93 2805.80 141.9 95.64 0.44 -0.07 1.89 6895.35 13.28 263.32 -2319.82 -1609.75 5794.86 2818.98 141.9 95.49 0.55 0.03 -2.39 6990.85 13.27 263.38 -2322.36 -1631.53 5887.81 2832.52 144.6 95.50 0.02 -0.01 0.06 7089.32 13.27 264.11 -2324.83 -1654.00 5983.66 2846.35 112.2 98.47 0.17 0.00 0.74 7182.98 12.70 263.66 -2327.07 -1674.93 6074.92 2859.18 123.0 93.66 0.62 -0.61 -0.48 7277.38 13.50 264.17 -2329.33 -1696.20 6166.86 2872.22 128.4 94.40 0.86 0.85 0.54 7371.71 13.32 265.19 -2331.36 -1717.98 6258.62 2885.33 133.8 94.33 0.32 -0.19 1.08 7468.87 13.34 266.03 -2333.07 -1740.32 6353.17 2898.45 136.5 97.16 0.20 0.02 0.86 7561.60 13.31 267.94 -2334.20 -1761.66 6443.40 2910.55 139.2 92.73 0.48 -0.03 2.06 7656.50 13.25 263.10 -2335.90 -1783.37 6535.76 2923.33 139.2 94.90 1.17 -0.06 -5.10 7753.01 13.31 264.86 -2338.22 -1805.42 6629.69 2936.82 139.2 96.51 0.42 0.06 1.82 7846.79 13.30 259.72 -2341.11 -1826.78 6720.96 2950.45 136.5 93.78 1.26 -0.01 -5.48 7940.60 13.28 256.27 -2345.60 -1847.87 6812.26 2965.28 139.2 93.81 0.85 -0.02 -3.68 8035.04 13.28 259.98 -2350.06 -1869.09 6904.17 2980.16 141.9 94.44 0.90 0.00 3.93 8129.91 13.30 264.03 -2353.09 -1890.67 6996.51 2994.01 144.6 94.87 0.98 0.02 4.27 Page 4 ADVANTAGE Final Survey Listing Operator Hilcorp Alaska, LLC Field Granite Point Field API No 50733204797200 Location S13 T10N R12E Well GP-55RD PB3 Wellbore GP-55RD PB3 Rig Spartan 151 Job 110026730 Tie MD Incl Azim North East TVD VS Temperature CRS LEN DLS Build Turn In ft deg deg ft ft ft ft degF ft deg/100ft deg/100ft deg/100ft 8225.21 13.29 262.55 -2355.65 -1912.43 7089.25 3007.56 147.3 95.30 0.36 -0.01 -1.55 8320.35 13.22 266.06 -2357.82 -1934.13 7181.86 3020.73 147.3 95.14 0.85 -0.07 3.69 8415.56 13.29 262.44 -2360.00 -1955.84 7274.54 3033.93 144.6 95.21 0.87 0.07 -3.80 8510.76 13.32 257.40 -2363.84 -1977.39 7367.18 3048.45 147.3 95.20 1.22 0.03 -5.29 8605.85 13.29 257.68 -2368.56 -1998.76 7459.72 3063.63 150.0 95.09 0.07 -0.03 0.29 8700.32 13.32 258.89 -2372.97 -2020.04 7551.65 3078.51 152.7 94.47 0.30 0.03 1.28 8794.81 13.31 268.78 -2375.30 -2041.60 7643.61 3091.75 152.7 94.49 2.41 -0.01 10.47 8889.39 13.33 272.79 -2375.00 -2063.38 7735.65 3102.86 155.4 94.58 0.98 0.02 4.24 8987.50 13.27 267.91 -2374.86 -2085.93 7831.13 3114.52 152.7 98.11 1.15 -0.06 -4.97 9080.66 13.30 262.89 -2376.58 -2107.25 7921.81 3127.11 155.4 93.16 1.24 0.03 -5.39 9173.80 13.32 261.37 -2379.51 -2128.49 8012.44 3140.70 155.4 93.14 0.38 0.02 -1.63 9268.56 13.52 266.18 -2381.89 -2150.33 8104.62 3154.13 152.7 94.76 1.20 0.21 5.08 9361.75 13.51 268.09 -2382.98 -2172.08 8195.23 3166.41 152.7 93.19 0.48 -0.01 2.05 9458.04 13.46 263.48 -2384.63 -2194.46 8288.87 3179.50 155.4 96.29 1.12 -0.05 -4.79 9551.90 13.50 263.30 -2387.14 -2216.19 8380.14 3192.99 152.7 93.86 0.06 0.04 -0.19 9645.51 13.28 260.51 -2390.19 -2237.65 8471.21 3206.79 152.7 93.61 0.73 -0.24 -2.98 9742.98 13.29 261.11 -2393.77 -2259.76 8566.07 3221.39 155.4 97.47 0.14 0.01 0.62 I 9813.00 13.85 257.27 -2396.86 -2275.88 8634.14 3232.44 70.02 1.51 0.80 -5.48 9858.36 11.21 272.68 -2397.85 -2285.59 8678.43 3238.35 141.9 45.36 9.34 -5.82 33.97 9929.93 10.46 278.88 -2396.52 -2298.95 8748.72 3244.20 141.9 71.57 1.93 -1.05 8.66 10025.24 15.58 260.72 -2397.25 -2320.16 8841.58 3255.89 141.9 95.31 6.82 5.37 -19.05 10119.61 19.88 245.82 -2405.88 -2347.33 8931.50 3277.43 144.6 94.37 6.59 4.56 -15.79 10216.33 21.41 243.33 -2420.54 -2378.11 9022.01 3306.00 131.1 96.72 1.82 1.58 -2.57 10310.03 21.87 243.64 -2435.96 -2409.03 9109.10 3335.30 133.8 93.70 0.51 0.49 0.33 I 10395.00 21.89 245.57 -2449.54 -2437.63 9187.95 3361.81 84.97 0.85 0.02 2.27 10552.94 40.34 235.89 -2490.76 -2507.41 9322.67 3433.40 136.5 157.94 12.07 11.68 -6.13 10647.56 45.35 231.91 -2528.73 -2559.29 9392.04 3492.87 141.9 94.62 6.02 5.29 -4.21 10754.89 43.80 225.77 -2578.22 -2615.99 9468.52 3564.68 136.5 107.33 4.27 -1.44 -5.72 10835.96 46.35 220.95 -2619.96 -2655.33 9525.79 3620.82 133.8 81.07 5.25 3.15 -5.95 10930.35 50.70 206.81 -2678.54 -2694.31 9588.46 3691.13 136.5 94.39 12.11 4.61 -14.98 Projection to TD 11044.00 50.70 206.81 -2757.04 -2733.98 9660.44 3778.79 113.65 0.00 0.00 0.00 Tie Column Legend: I - interpolated tie-point, S - survey station, U - user-defined, T - Surface Page 5 TD Shoe Depth: PBTD: Jts. X Yes No X Yes No 10 Fluid Description: Liner hanger Info (Make/Model):Liner top Packer?:X Yes No Liner hanger test pressure:Yes X No Centralizer Placement: Preflush (Spacer) Type: Density (ppg) Volume pumped (BBLs) Lead Slurry Type:Sacks: Yield: Density (ppg) Volume pumped (BBLs) Mixing / Pumping Rate (bpm): Tail Slurry Type:Sacks: Yield: Density (ppg) Volume pumped (BBLs) Mixing / Pumping Rate (bpm): Post Flush (Spacer) Type: Density (ppg) Rate (bpm): Volume: Displacement: Type: Density (ppg) Rate (bpm): Volume (actual / calculated): FCP (psi): Pump used for disp: Yes X No Casing Rotated? Yes X No Reciprocated? Yes X No % Returns during job Cement returns to surface? Yes X No Spacer returns? Yes X No Vol to Surf: Cement In Place At: Date: Estimated TOC: Method Used To Determine TOC: Casing (Or Liner) Detail Reamer Shoe 7 5/8 29.0 L-80 Rotate Csg Recip Csg Ft. Min. PPG13 Shoe @ 10685'FC @ Top of Liner 4,796' Floats Held3000 OBM CASING RECORD County State Alaska Supv.Bob Mize Hilcorp Energy Company CASING & CEMENTING REPORT Lease & Well No.GPF GP-55RD Date Run 11-Oct-19 Setting Depths Component Size Wt. Grade THD Make Length Bottom Top DWC/C 1.41 10,685.00 10,683.59 Csg Wt. On Hook:197,000 Type Float Collar: No. Hrs to Run:36 8.8 8 2250FIRST STAGE54/54 0 Rig 14.5 81 Bump pressBump Plug? 21:30 10/16/2019 10,685.0010,685.00 CEMENTING REPORT Csg Wt. On Slips:197,000 OBM Type of Shoe:Reamer Casing Crew:Weatherford Baker www.wellez.net WellEz Information Management LLC ver_04818br 2 PUP 7 29.0 L-80 DWC/C 20.77 10,683.59 10,662.82 Jts Casing 1:143 7 29.0 L-80 DWC/C 5,839.46 10,662.82 4,824.77 XO PUP 7 29.0 L-80 DWC/C Ten 14.46 4,824.77 4,810.31 Low Quick Connect 7 29.0 L-80 Ten Blue 2.42 4,810.31 4,807.89 Upper Quick Connect 7 29.0 L-80 Ten Blue 3.08 4,807.89 4,804.81 Liner Set Sleeve 7 29.0 L-80 Ten Blue 8.67 4,804.81 4,796.14 G 316 1.45 Sqz'd through perf holes at 10416 ft (retainer set 10417ft) gls 12/14/20 1. Type of Request:Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ___________________ 2. Operator Name:4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address: Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception?Yes No 9. Property Designation (Lease Number): 10. Field/Pool(s): 11. Total Depth MD (ft):Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 10,756'N/A Casing Collapse Structural Conductor Surface 1950 psi Intermediate 7950 psi Production 7030 psi Liner (FISH) Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): 12. Attachments:Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations:OIL WINJ WDSPL Suspended 16. Verbal Approval:Date: GAS WAG GSTOR SPLUG Commission Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Date: 10/8/2020 Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Post Initial Injection MIT Req'd? Yes No Spacing Exception Required? Yes No Subsequent Form Required: APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Signature: N/A 2-7/8" N/A Authorized Title: Operations Manager Authorized Name: Dan Marlowe 10,395' (TOW) Perforation Depth MD (ft): 4,997' N/A 5,599' Perforation Depth TVD (ft):Tubing Size: 9,345'7" 229'33" 26" 13-3/8" 306' 9-5/8"4,997' 1,318' MD 10900 psi 3450 psi 306' 1,318' 4,091' 306' 1,318' Granite Point Field / Middle Kenai Oil Pool Granite Point 55RD PRESENT WELL CONDITION SUMMARY 229'229' L-80 TVD Burst 492' 8160 psi STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL018761 219-103 3800 Centerpoint Drive, Suite 1400, Acnhorage, AK 99503 N/A 50-733-20479-01-00 Hilcorp Alaska, LLC COMMISSION USE ONLY Tubing Grade:Tubing MD (ft): N/A N/A Dan Marlowe dmarlowe@hilcorp.com 283-1329 9,489'10,196'9,005'N/A 10,196' Length Size m n s 66 t _ c s Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval. By Samantha Carlisle at 10:29 am, Oct 14, 2020 320-441 Digitally signed by Daniel Marlowe DN: cn=Daniel Marlowe, ou=Users Reason: I am approving this document Date: 2020.10.13 16:06:11 -08'00' Daniel Marlowe Inspection Suspended gls 10/16/20 Suspend SFD 10/14/2020 DSR-10/15/2020 X 10-407 (As Suspended report ) X DLB10/14/2020 * submit all logging and directional data with 10-407 report. y: Comm. 10/20/2020 dts 10/20/2020 Suspended Well Inspection Data Well: GP 55RD Surface Location: 2437’ FNL, 1303’ FWL, Sec 13, T10N, R12W, SM, AK Permit to Drill: 219-103 API: 50-766-20479-01-00 Size Pressure (psi) Tubing 2-7/8” 0 Casing 9-5/8” 0 13-3/8” 0 *Note: Wellhead pressures to be recorded monthly at minimum. Other Notes: Due to multiple attempts at drilling this well and encountering severe losses, Hilcorp shutdown drilling operations of GP-55RD and RDMO on 11/10/2019. Hilcorp is requesting a suspension to this well, with the anticipation of future use / new drilling plan. Attachments: x Current Well Schematic x Plat - 1/4mile radius of wellbore Operations shutdown NOTE: submit all logging data if not already submitted with 10-404 for OPs Shutdown. _____________________________________________________________________________________ Updated By: CJD 12/5/2019 Current Schematic Granite Point Field Well: GP 55RD Last Completed:Future PTD: 219-103 API: 50-733-20479-01-00 CASING DETAIL Size Wt Grade Conn ID Top Btm 26” Conductor Surf 306’ 13-3/8” 68 K-55 BTC 12.415 Surf 1,318’ 9-5/8” 53.5 P-110 BTC 8.535 Surf 4,997’ 7” 26 L-80 DWC/C 6.276” 4,796’ 10,395’ (TOW) TUBING DETAIL 2-7/8” 6.4 L-80 IBT 2.441 Surface 492’ JEWELRY DETAIL No Depth (MD)Item 1 10,395’ Whipstock (Not Pictured) PBTD:±10,196’ MD TD:10,756’MD RKB = 132’ 7” 106 bbls pumped below Retainer 13-3/8” 9-5/8” Cmt Retainer – 10,327’ MD 26” TOW –10,395’ 5 bbls pumped on top of Retainer; Est. TOC @ 10,196’ MD GP 55 P&A ¶ ' ¶' ' Q 0 ' ¶ ¶¶ ¶ ¶' ' ¶ ¶ ' ¶ ¶ 0 Y ' ' 'Y Y Y 0 ¶ Q Q¶Q !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! ! !!!! ! !!!!¶'¶''Q0'¶¶¶'''¶¶0'¶¶''¶''¶'¶¶0Y¶'0'''Y¶'''Y Y 00¶Q'Q¶Q ¶Q¶Q !!!!" GP-55RD PB1 BHL GP-55RD PB2 BHL GP-55RD PB3 BHL GP-55RD BHL S010N012W Sec. 13 S010N012W Sec. 14 S010N012W Sec. 24 S010N012W Sec. 23 Granite Pt GRANITE POINT UNIT GP-55RD PATHGP-11-13 BHL GP-11-13RD BHL GP-11-24 BHL GP-11-24PB BHL GP-11-24RD BHL GP-11-24RD PB BHL GP-13-13 BHL GP-22-13 BHL GP-24-13 BHL GP-24-13RD BHL GP-31-14 BHL GP-31-14RD1 BHL GP-31-14RD2 BHL GP-31-23 BHL GP-32-23PB BHL GP-33-13 BHL GP-33-14 BHL GP-33-14RD BHL GP-44-14 BHL GP-50 BHL GP-51 BHL GP-52 BHL GP-55 BHL GRANITE PT 1 BHL MUC-I-03 BHL GP-53RDPB BHL GP-31-23PB1 BHL GP-55RD PB2 BHL GP-55RD BHL 0 500 1,000 Feet Alaska State Plane Zone 4, NAD27 ¯ Legend Quarter-Mile Radius around Well Bore Oil and Gas Unit Boundary Map Date: 10/7/2020 GRANITE POINT GP-55RD Suspended Well ! ! ! ")") ")")")")") ")")") ")")") ") ") Location Map Overview Coo k I nl et Kenai Tyonek Anchorage HAK Petra Well Symbol'Other'Oil 0 INJ Q P&A¶P&A Oil Q TA Y Suspended Schwartz, Guy L (CED) From: Schwartz, Guy L (CED) Sent: Thursday, November 7, 2019 9:02 AM To: 'Mack Myers'; Cody Dinger Subject: RE: PTD #219-103 (GP55RD P&A Prod Hole) You have verbal approval to suspend operations (Operational Shutdown) for the well as proposed. Submit a 10-403 sundry ASAP. Include a 2500 psi pressure test of the casing after pumping cement. A 10-404 report will be required ( vs 10-407 ) since well won't be reentered within 30 - days. (see 20 AAC 25.072(b) It will need to include all logs and reports for the well to date. Regards, Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Guy Schwartz at (907-793-1226) or (Guy.schwartz@alaska.aov). From: Mack Myers <mmyers@hilcorp.com> Sent: Thursday, November 7, 2019 7:09 AM To: Schwartz, Guy L (CED) <guy.schwartz@alaska.gov>; Cody Dinger <cdinger@hilcorp.com> Subject: PTD #219-103 (GP55RD P&A Prod Hole) Good morning Guy, After our discussion last Friday about the possibility of P&A on this hole section and RDMO, we have arrived at that decision. After multiple attempts to cement the losses that we have seen while drilling the 6-1/8" production hole, we have decided that is time to cut this well short and set a retainer and squeeze the hole that we have drilled. Our plan forward is to: • RIH with a cement retainer and set it at 10,380' TMD. • Establish an injection rate • Mix and pump the remaining cement we have on the jackup (-80 bbls) of cement mixed to a 13.5 ppg • We will unsting from the retainer with 5 bbls left inside pipe and lay 5 bbis of cement on top of the retainer. • Estimated TOC will be - 10,245' • We will reverse circulate the well clean and displace the OBM from the well at 10,240' with FIW with corrosion inhibitor. • POOH and LD retainer running tools • RU and run —450' of 2-7/8" tubing for a kill string • ND BOPE • RU Tree and test • Skid to GP53RD to perforate and run the completion. We will write up and send over a 10-403 today documenting the changes and will also request to withdraw the completion sundry #319-410. Thank you! Please let me know if you have any questions or concerns. Monty M Myers Drilling Manager 907.538.1168 (c) 907.777.8431 (o) The information contained in this e-mail message is confidential information intended only for the use of the recipient(s) named above. In addition, this communication may be legally privileged. If the reader of this e-mail is not an intended recipient, you have received this e-mail in error and any review, dissemination, distribution or copying is strictly prohibited. If you have received this e-mail in error, please notify the sender immediately by return e-mail and permanently delete the copy you received. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Hilcorp Alaska, LLC IIilvorliAla•ka.i.l.(: Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date GP-55RD Spartan 151 50-733-20479-01-00 219-103 9/13/2019 1 Future Daily Operations: 10/30/19 - Wednesday Wash cmt stringers f/ 10,093' t/10, 273' where it started holding light wt. Clean out to 10,337' and it started holding 3 to 5k bit wt. Firm cmt. Drill cmt f/ 10,337't/ 10, 408'. Bottom of window. PU to top of window. Circ hole clean getting back cmt. Get SPRs, Monitor well, Pump dry job. POH to 10,000'. Secured well for a fire drill at 10:00 hrs. Good response on drill. Continue POH. Broke bit, bit sub and float sub out and stood back 4 3/4 DCs. PU directional drilling BHA. Adjust motor to 1.80', MU bit and orientate to MWD. PU NM flex collar. Plug into tool and upload. Had to change some software because tool was set up for a rotary steerable. Cont. P/U remainder of BHA #19, NM flex collars, jar, and 4" HWDP while cont. to clean mud pits. Slip & cut 134' of drill line, preformed rig serviced, finished cleaning pits 1-3, and started building new batch of MOBM mud. RIH w/ 3 stds. of 4" DP, XO, RIH w/ 2 stds. of DC for push pipe, XO & cont RIH w/ 4" DP T/1,832'. Held PTSM, crew change, cont. RIH F/1832'-T/3,092', filled pipe & shallow tested MWD tools (ok). Cont. RIH F/3,092' to TOL @ 4763', went through liner w/ no issues, cont. RIH F/4763'-T/10,307', fill pipe every 3500', had calculated pipe displacement during trip. Kelley up & washed down F/10,307'-T/10,396', orientated tools face at the TOW, eased down through window w/ no issues, started time slide drilling, current depth 10,413'. P/U-215K S/0-170K GPM-247 SPP-2138 psi. 10/31/19 -Thursday Time drilling 61/8" hole at 1'/ hr w/ mudmotor f/ 10,413't/10, 419'. 260 GPM, 2200 Psi, 1 to 2k WOB. Time drilling 61/8" hole at 1'/hr w/ a mud motor f/ 10,419't/ 10,422'. 260 GPM, 2160 psi. 1.5 to 2.5k WOB. Getting 20% sand. Still building vol in pit 1. Time drilling 61/8" hole at 2'/hr w/ a mud motor f/ 10,422't/ 10,427'. 260 GPM, 2160 psi. 2 to 3k WOB. Getting 25% sand and hard cmt. Building vol in pit 1. Running centrifuge and maintaining mud wt at 9 ppg. Looks like it wants to pull back to the old hole. Work pipe to get it back to 110° to the left and get away from the old hole. Go back to 1'/hr and time drill f/ 10,426't/10,432', formation percent dropped from 25%-10%. 261 GPM, 2140 Psi P/U-215K 5/0-170K. Called town, decision was made to orientate tool face to 150° left, reduced GPM to 220 and attempt to hold 5K WOB, drilled F/10,432'-10,436' w/ no WOB, P/U & worked pipe, re-orientated tool face to 150' to the left, applied 2K WOB. kept pumps at 220-GPM and went back to time drill at 1'/hr. F/10,436'-T/10,437', cutting sample showed formation percent dropped to 5% and cmt was soft & mushy coming back. Cont. time drilling at 1'/hr., while holding tools face at 145°-150° left, cont. to attempt to get departure from old well bore. GPM-220 SPP-1732 psi, F/10,437'-T/10, 439', w/ no success, P/U off bottom and started troughing to help w/ departure, called town, decision was made to slide drill. T/10,448' and resume time drilling at 1'/hr, while holding tools face at 145°-150" left, right above a 10' coal at 10,455', attempting to get kicked off in coal seam. current depth 10,448'. Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date GP-55RD Spartan 151 50-733-20479-01-00 219-103 9/13/2019 Future 11/1/19 - Friday Drill do sliding down f/ 10,448't/ 10,453'. Looking for top of 5' coal to assist in kick off. Pump packed off w/ a 250 Psi increase. Shut pump down and pipe was hung up. 750 Psi was trapped on DP. Bleed pressure off and cock jars. PU to 350k and pipe jarred free. Work pipe and get toolface back 150' left. Slide back down but pipe packed off at 10,444' again. Shut do pump and bled press. Pipe pull free w/ a 10k overpull. Work pipe and get toolface back to 150" left. Slide back down to 10,450'. Getting 20% cmt w/ trace of sand, but mostly LCM mud products. Seen an increase in gas f/ 3 t/5 U. Time drilling 61/8" hole at 1FPH f/ 10,450't/ 10,453'. Started showing traces of formation with very little cmt and mostly mud products. Holding 150* to the left to get away from the old well, started bring mud system up to 5 ppb w/ soltex & baratrol. Cont. time drilling 61/8" hole at 1.5FPH f/ 10,453't/ 10,460', cuttings sample started showing 40% formation with cmt & mud products. Holding 150° to the left to get away from the old well. P/U-215K S/0-172K GPM-239 SPP-1980. Cont. time drilling 61/8" hole, staged up ROP F/4-T/12 FPH f/ 10,460't/ 10,461', started seeing an increase in weight & diff, WOB-4.9 Diff 20 psi, at 10,462' weight & diff fell off and tool face went to 80° left, P/U and worked pipe, re- orientated tool face, eased back to bottom, cont. time drilling 6-1/8" hole at 3 FPH, F/10,461'-T/10,466', seen increase in diff (80 psi), but very little weight (.9k), cuttings sample from 10,462 showed 90% cmt/ mud product & 10 formation, call town, decision was made to slide drill ahead and see if we could get it to stack more WOB. Cont. time drilling 6-1/8" hole at 6 FPH, F/10,466'-T/10,468', WOB-1.6K Diff-35 psi, cutting sample came back w/ 60-70% formation/mud product & 30% cmt, cont. time drilling 6-1/8" hole ahead at 10 FPH, F/10,468'-T/10,469', WOB-5.1K Diff-61 psi, while cont. to hold tool face at 150° left, cutting sample came back again w/ 60-70% formation/mud product & 30% cmt, Cont. time drilling 6-1/8" hole ahead at 12 FPH, F/10,469'-T/10,471', WOB-5.2K Diff-57 psi, started to see weight drill off while holding some diff pressure and tool face holding at 150° left. P/U & had to work it a little while to get our tool face orientated to 150° left, called town, decision was made to start to trough. P/U-215K S/0-172K GPM-241 SPP-1950 psi. began to trough F/10,415'-T/10,470' for 2 hrs , while cont. to catch sample marks from 10,468'& 10,470', both showing 80%formation/mud products & 20% cmt. Cont. time drilling 6-1/8" hole at 2 FPH, F/10,470'-T/10,471', WOB-0 Diff-0 psi, while holding tool face at 150°-170° left, cutting sample F/10,471' still showing 80% formation/mud products & 20% cmt, plan forward is the bring ROP up by 1' every/hr. Cont. time drilling 6-1/8" hole at 3 FPH, F/10,471'-T/10,473', WOB-1.5K Diff-34 psi, while holding tool face at 150°-170° left, cutting sample F/10,472' started showing 90% formation/mud products & 10% cmt. Cont. time drilling 6-1/8" hole at 4 FPH, F/10,473'-T/10,476', WOB- 2.5K Diff-36-46 psi, while holding tool face at 140°-150° left, cutting sample F/10,475' still showing 90% formation w/ less mud product & 10% cmt, formation cutting are looking like shavings from PDC bit. Cont. time drilling 6-1/8" hole at 5 FPH, F/10,476'-T/10,481', W0B-3.1K Diff-58 psi, while holding tool face at 90"-110° left, cutting sample F/10,479' still showing 90% formation/mud products & 10% cmt. Cont. time drilling 6-1/8" hole at 6 FPH, F/10,481'-T/10,488', WOB-35K Diff-38-62 psi, while holding tool face at 80°-90' left, brought ROP to 7 FPH @ 06:00 hrs. Hilcorp Alaska, LLC IIiI,-,,.,) kIit:kit. L L( Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date GP-55RD Spartan 151 50-733-20479-01-00 219-103 9/13/2019 Future 11/2/19 -Saturday Cont. time drilling 6-1/8" hole at 6 FPH, F/10,488', t/ 10538' WOB-3.5K Diff-38-180 psi, while working tool face up t/ 30-45 left, brought ROP to 12- 28' working off TF and diff and up gpm t/ 260 gpm. Wash ooh t/ 10490' (ok) ream slide @ 60 rpm w/ 6k TQ back to btm X 2 (ok). Resume slide drilling @ 30-45 left f/ 10,538' t/ Kelly do @ 10,587' WOB 6-8k Diff 100-170 psi, @ 260 gpm @ 2250 psi. Wash ooh t/ 10,488' (ok) ream slide @ 60 rpm w/ 6k TQ back to btm @ 10,587'X 2 (ok) Make connection survey still hot w/ 25.98 degs. Resume slide drilling @ 30-45 left working off TF and diff. f/ 10,587' t/ Kelly do @ 10,682' WOB 6-8k Diff 100-170 psi, @ 260 gpm @ 2250 psi started taking losses @ 10,571' +- 60 bph slowed t/ 220 gpm and continued drilling ahead to Kelley do w/ total 38 bbfs lost and holding. straight pull off btm t/ 10,672' ok and back reamed t/ 10,585' (ok) Ream @ 60 rpm w/ 6k TQ back to btm @ 10,682'X 2 (ok) Make connection and staged up t/ 230 gpm and got a good survey @ 10,632'w/ INC @ 35.07 and AZ @ 221.35 w/ no losses. Orientate and resume slide drilling F/10,682' w/ 230 gpm SPP-2040 psi, WOB 5-7K, @ 10,695, started seeing seepage losses, pumped a 10 bbl 8.9 ppg LCM pill, at 80 lbs per/bbl around while drilling ahead, losses healed up. cont. slide drilling ahead F/10,695', w/ 224 gpm SPP-2140 psi, WOB 5-7K, @ 10,727', started seeing seepage losses, pumped a 10 bbl 8.9 ppg LCM pill, at 80 lbs per/bbl around while drilling ahead, seepage losses slowed down. Cont. drilling ahead w/ minimal losses F/10,727', w/ 224 gpm SPP-2172 psi, WOB 7-8K Diff 299, @ 10,745', lost all returns, slowed pump rate to 50-GPM, P/U to 10,697', pumped 20 bbl 8.9 ppg LCM pill, at 80 lbs per/bbl down pipe at 100-GPM, while filling back side from TT, got well stood up w/ 10% return flow once pill rounded the corner, shut down pumps, POOH F/10,697'- T/10,397' w/ no issues, monitored hole for 1 hr. while circ. across hole w/ TT, zero losses. RIH below window @ 10,418', staged pumps up to 230- GPM w/ no losses while circ., cont. RIH F/10,426'-T/10,479', took 10K weight, P/U, brought on pumps (220-GPM), orientated tool face and washed right through, cont. RIH F/10,479'-T/10,679', Kelley up, staged up pumps to 220-GPM, washed down and tagged up @ 10,743'. Attempted to drill ahead, lost all return, P/U & slowed pumps T/10,685'(70-GPM), lined up and pumped 20 bbl 8.9 ppg LCM pill, at 80 lbs per/bbl down pipe at 100- GPM, while filling back side from TT, got well stood up w/ 10% return flow once pill rounded the corner, shut down pumps, POOH F/10,685'- T/10,388' w/ no issues, monitored hole, while circ. across hole w/ TT, zero losses. Cont. monitoring well on TT while building mud volume. Total losses for the day 273 bbls. 11/3/19 - Sunday Cont. monitoring well on trip tank w/ bit above window @ 10,388' while building mud volume. w/.5 bbl loss in 8 hrs. Cont. monitoring well on trip tank w/ bit above window @ 10,388' while building mud volume. Worked pipe once and moved 10 bbls in drill string w/ 1 bbl loss in 12 hrs. Cont. monitoring well on trip tank w/ bit above window @ 10,388', finished first 298 bbl batch of MOBM w/ 40 ppb of back ground LCM. working on mixing 70 bbl LCM pill w/ 80 ppb of LCM for spotting in case of total losses. Losses while circ. over top of hole over the last 18 hrs=1 bbl. Cont. working on mixing 70 bbl LCM pill w/ 80 ppb of LCM in slug pit#1. Worked on camera in the derrick, changed out shaker screen from API 200's to API 80's to reduce the amount on LCM being strip out of our mud while drilling. P/U std. RIH T/10,420' just outside BOW, pumped 10 bbls through MWD tools to ensure LCM material wasn't settling out and plugging tools, finished mixing 70 bbl LCM pill w/ 80 ppb of LCM, started working on 2nd 298 bbl batch of MOBM w/ 40 ppb of back ground LCM, losses over the last 21 hrs. =1.3 bbls. Cont. to work on 2nd 298 bbl batch of MOBM w/ 40 ppb of back ground LCM, losses over the last 24 hrs.=1.8 bbls. Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit NumberStart Date End Date GP-55RD Spartan 151 50-733-20479-01-00 219-103 9/13/2019 Future 11/4/19 - Monday Cont. to work on and finish 2nd 298 bbl batch of MOBM w/ 40 ppb of back ground LCM, losses over the last 30hrs.=2.2 bbls. Take on diesel from platform, house cleaning and rig maintenance. Take hole off trip tank and line up on Pit #3 short system. Rih two std f/ 10,387- t/ 10,577' (OK) work full std and circ @ 107 gpm @ 640 psi and add LCM product to bring back ground of hole mud t/ 40 ppb LCM stage up t/ 220 gpm Loss rate stable. Rih f/ 10, 584' and taking weight 25- 30k X3 @ 10,595' (coal) wash ream t/ 10,620', do pump and rotation. Rih taking weight 20-25k wash ream @ 10,652' Rih t/ 10,717'. Safety wash and ream @ 40 rpm @ 6-7k @ 1320 psi @ 174 gpm. Rotary drill f/ 10,745' t/ 10,750' w/ 140 bbls of loses and zero to 13% returns, orientate and slide drill @ 30 L t/ 10,756' @ 1680 psi @ 200 gpm while spotting 20 bbl 80 PPB LCM pill w/ additional 268 bbls lost. Pooh back through window and into csg t/ 10,367'@ monitor well on trip tank w/ no losses for 2 hrs. RIH T/10,432', oriented tool face 90" left, GPM -205, SPP -1730 psi, shut down pump, RIH w/ no issues T/10,722', tagged LCM fill, Kelley up, washed down T/10,754', GPM -100, SPP -670 psi, proceeded to pump & clean up open hole, lost returns, slowed pump rate 50 GPM, tried to re-establish circ., w/ no success, shut down pump, back side was full, lost 17 bbls while pumping, POOH on trip tank, had a 30K over pull @ 10,752', worked though on elevators, pulled back in the window @ 10,385', monitor hole on TT, while finishing up mixing slug 2.5 ppb over MW, lost 1.5 bbl over 2 hr., pumped slug, slug ineffective, built 2nd slug and pumped, pipe came dry. POOH F/10,385' -T/4749' TOL, flow check @ TOL (ok), cont. POOH F/4749' to BHA #19, racking back BHA in derrick at current time., while working on 3rd 298 bbl batch of MOBM w/ 40 ppb back ground LCM, hole fill during trip was 10 bbls over calculated. 11/5/19 - Tuesday Continue working bha, Continue working on 3rd 298 bbl batch of MOBM w/ 40 ppb back ground LCM. Monitor hole clean floor Load door w/ cmt stinger static loss rate @ zero. P/up 14 jts 2-7/8" tbg stinger @ 441.46' total w/ def user and btm 6' has 40 -3/8" hole @ +- 60 deg phased. Rih w/ 2-7/8" cmt defuser on dp out of derrick broke circ twice to window taking weight @ 10.690'. wash cmt stinger to btm f/ 10,690't/ 10, 756' and stage rate t/ 220 gpm 1140 psi pick up and drift w/ no pump ok w/ 12 bbl loss while washing rack back stand. Space out r/up cmt head and lines load foam balls PJSM & pressure test lines 300/3000 psi (ok). Pump 25 bbls 13.55 ppg Class G Cement @ 4 bpm, chase w/ 5 bbls H2O, Drop top ball, Displace with 113 bbls 9.1 ppg OBM, ICP 526 psi @ 5 bpm FCP 800 psi @ 4 bpm. L/D Cement head and Pull and stand back 10 stands of DP f/ 10752't/ 9769'. Line up and squeeze cement staging pumps t/ 1.3 bpm 500 psi max psi 12.2 bbls squeezed injection started @ 415 psi, shut down pressure bled down to 440 psi and held, bleed off pressure CIP 2010 hrs. Line up and Circulate surface to surface 7 bpm 1450 psi no cement on bottoms up, pump slug. POOH on Elevators f/ 9769't/ 441'. Change out floor equipment, L/D 2 7/8" cement stinger. Clean and clear rig floor, P/U and crane BHA components to floor. M/U BHA as per DD/MWD. Schwartz, Guy L (CED) From: Schwartz, Guy L (CED) Sent: Thursday, October 17, 2019 8:29 AM To: Mack Myers Subject: RE: PTD #219-103 (GP55RD 7" Liner cement) Monty, You have approval to proceed as planned and cement the 7" liner as proposed below ... we can always go back with a CBL and determine cement placement later. After drillout update me on how the FIT goes (13 ppg EMW is required). Regards, Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Guy Schwartz at (907-793- 1226 ) or (Guy.schwartz@alaska.gov). -----Original Message ----- From: Mack Myers <mmyers@hilcorp.com> Sent: Wednesday, October 16, 2019 7:30 PM To: Schwartz, Guy L (CED) <guy.schwartz@alaska.gov> Subject: Re: PTD #219-103 (GP55RD 7" Liner cement) Guy, Update on the liner top packer. It was set when we set the retainer and the hanger. We tested it and held positive pressure. We have good injection into the formation (likely the loss zone) and will squeeze 75 bbls at the window depth, behind pipe. This would give us 3650' of cement coverage behind pipe if it all went up. Monty M Myers 907.538.1168 > On Oct 16, 2019, at 3:17 PM, Mack Myers <mmyers@hilcorp.com> wrote: The information contained in this e-mail message is confidential information intended only for the use of the recipient(s) named above. In addition, this communication may be legally privileged. If the reader of this e-mail is not an intended recipient, you have received this e-mail in error and any review, dissemination, distribution or copying is strictly prohibited. If you have received this a -mail in error, please notify the sender imme„,ately by return e-mail and permanently delete the copy you received. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Schwartz, Guy L (CED) From: Mack Myers <mmyers@hilcorp.com> Sent: Tuesday, September 17, 2019 4:45 PM To: Schwartz, Guy L (CED); Rixse, Melvin G (CED) Cc: Cody Dinger Subject: PTD #219-013 (Intermediate casing depth pushed deeper) Follow Up Flag: Follow up Flag Status: Flagged Guy, Due to the recent success of the Two Trip Drilling Liner (TTDL) on GP53RD and A-10RD for the 7" liner sections, Hilcorp requests approval to extend TD of the GP55RD 8-3/8" hole section to 11,000'(9,581' TVD). We are currently permitted to drill to 9,500" TMD (8,328' TVD). This is 1,253' deeper in TVD. I updated the FIT and Kick tolerance data below 12.10 Conduct FIT to 13.0 12.11 (13.0 — 9.0) * 0.052 * 4115' = 856 psi 12.12 Dick Tolerance • (13.0 -9.0) * (4115/9581) = 1.7 By utilizing the TTDL we should be able to isolate the troublesome coals pictured below, and land in the C7C. We did this on GP53RD and had zero issues tripping in and out of the Tyonek C5 with drill pipe and the liner. The directional plan and cement volumes will not change for the well. Please let me know if you have any questions or concerns with this plan. GP -11.24 GP -44.14 GP -13.13 GP -50 GP-11.13RD GP -11.13 • • • • • • Monty M Myers Drilling Manager 907.538.1168 (c) 907.777.8431(o) The information contained in this e-mail message is confidential information intended only for the use of the recipient(s) named above. In addition, this communication may be legally privileged. If the reader of this e-mail is not an intended recipient, you have received this e-mail in error and any review, dissemination, distribution or copying is strictly prohibited. If you have received this e-mail in error, please notify the sender immediately by return e-mail and permanently delete the copy you received. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Schwartz, Guy L (CED) From: Mack Myers <mmyers@hilcorp.com> Sent: Wednesday, October 16, 2019 3:18 PM To: Schwartz, Guy L (CED) Subject: PTD #219-103 (GP55RD 7" Liner cement) Follow Up Flag: Follow up Flag Status: Flagged Guy, This is a follow up email to our phone call. This is a 2 part issue also. While drilling the GP55RD with losses we blind drilled a few hundred feet from 10,300-ish to 10,500-ish with partial return and sporadic surveys. When we were finally able to get good surveys we had deviated from our well a few degrees and knew that we would need to mill a window and sidetrack our well from above the shoe as opposed to drilling out the bottom of the shoe. Decision was made to run liner to bottom and cement and put together a sidetrack plan to stay on plan. Our KOP for the window will be at 10,408', putting us below the loss zone. — 1, We were able to successfully run our 7" liner using the TTDL (two trip drilling liner) and got it on bottom and released from it. We were due for our BOP test so we stopped and tested BOP'S while tripping out of hole with our inner string. We then laid down the inner string after the test and picked up our cement retainer and tripped in the hole to the liner. After we stabbed in we were unable to circulate the well with 1500psi all the way up to 5000psi. Our retainer for the cement job was set at 10,426'. The plan is to perforate just above the retainer with 3' of guns from 10,423'-10,426' and establish an injection rate. We will squeeze 75 bbls of cement into the perfs for our window, and to hopefully plug the loss zone. Please let me know if you have any issues with our plan. VL4 Thank you! Monty M Myers Drilling Manager 907.538.1168 (c) 2 ;-Wi DEC - 5 2119 STATE OF ALASKA AL/, - .,A OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS lie 1. OperationsAC AbandonEJ Plug Perforations Lj Fracture Stimulate LJ Pull Tubing Li Operations shutdown Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Operator Hilcorp Alaska, LLC 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development ❑� Stratigraphic ❑ Exploratory p Service ❑ 219-103 3. Address: 3800 Centerpoint Drive, Suite 1400, Anchorage, 6. API Number: AK 99503 50-733-20479-01-00 7. Property Designation (Lease Number): 8. Well Name and Number: ADLO18761 Granite Point 55RD 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): Drlg DYNAMICS, ANNULAR PRESSURE/MPR,COMP NEUTRON PORE, GR/ PB1,2,3 Granite Point Field / Middle Kenai Oil Pool 11. Present Well Condition Summary: Total Depth measured 10,756 feet Plugs measured 10,196' feet true vertical 9,489' feet Junk measured N/A feet Effective Depth measured 10,196 feet Packer measured N/A feet true vertical 9,005 feet true vertical N/A feet Casing Length Size MD TVD Burst Collapse Structural 229' 33" 229' 229' Conductor 306' 26" 306' 306' Surface 1,318' 13-3/8" 1,318' 1,318' 3450 psi 1950 psi Intermediate 4,997' 9-5/8" 4,997' 4,091' 10900 psi 7950 psi Production 5,599' 7" 10,395 (TOW) 9,345' 8160 psi 7030 psi Liner I Perforation depth Measured depth N/A feet True Vertical depth N/A feet Tubing (size, grade, measured and true vertical depth) 2-7/8" L-80 492' 492' Packers and SSSV (type, measured and true vertical depth) N/A N/A N/A N/A 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Treatment descriptions including volumes used and final pressure: NIA 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: N/A Subsequent to operation: N/A 14. Attachments (required Per 20 AAC 25.070, 25.071, a 25.283) 15. Well Class after work: Daily Report of Well Operations ❑✓ Exploratory ❑ Development ❑� Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑� Def Survey Only 16. Well Status after work: Oil ❑✓ Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 3 11 13 Authorized Name: Monty Myers Contact Name: Cody Dinger Authorized Title: Drilling Manager Contact Email: odinger .hilcorp.com Authorized Signatur r Date: 1 Contact Phone: 777-8389 Form 10-404 Revised 4/2017 "rte DMS 60-1 DEC 0 61019 Submit Original Only GP 55RD Summary • 9/15/19 Spud 8-3/8" hole • 9/24/19 encountered losses 10,341' MD • 9/28/19 pump 34 bbl cmt plug to heal losses hard TOC @ 9,813' MD • 9/30/19 kick off at 9,813' time drilling/troughing in 8-3/8" hole • 10/1/19 losing mud again at 10,174' MD • 10/1/19 —10/7/19 Use various techniques to heal losses; drilled to 10,408' on 10/3/19 • 10/8/19 TD hole section at 10,685' MD • 10/10/19 Begin running 7" liner with inner string • 10/13/19 Drill inner string pilot hole w/ 6-1/8" bit to 10,717' MD 7" liner @ 10,687' • 10/15/19 RIH with LTP and Baker cement retainer, unable to circulate • 10/16/19 perf and squeeze — perf with Eline at 10,423'. Squeeze 81 bbls of cmt. 7 • 10/21/19 Set whipstock at 10,412' MD TOW 10,395'/ BOW 10,408' MD 3c • 10/25/19 Stuck pipe at 11,033' MD • 10/25/19 —10/29/19 Attempt various techniques to free pipe — no luck. TOF 10,527' BHA w/ Nukes left in hole. • 10/29/19 RIH w / cement stinger and spot cement to TOW at 10,395' MD / TAG at 10,049' MD • 10/31/19 Time drill and kick off cement plug with 6-1/8" bit • 11/2/19 Lost circulation and returns at 10,743' MD • 11/4/19 Drill to 10,756' MD with losses, LCM ineffective. • 11/5/19 Attempt to cure losses with cement, pumped 25 bbls of cement — POOH • 11/6/19 RIH w BHA encountered no hard cement and continued losses, decision made to POOH and ultimately, RDMO • 11/7/19 RIH w 7" cement retainer, set at 10,270' MD — pump 106 bbls below and 5 bbls on top. • 11/8/19 Begin rigging down and moving off r_� .� f G- '2 Joe.) R° • 11/10/19 Run 2-7/8" kill string to 492', Rig released to GP -53. l Lease & Well No. County TD 10.685.00 Hilcorp Energy Company CASING & CEMENTING REPORT GPF GP-55RD State Alaska Supv CASING RECORD Liner Shoe Deoth: 10.685.00 PBTD: Date Run 11 -Oct -19 Bob Mize Csg Wt. On Hook: 197,000 Type Float Collar: Casing (Or Liner) Detail 36 Setting Depths As. Component Size Wt. Grade THD Make Length Bottom Top Reamer Shoe 75/8 29.0 L-80 DWC/C 1.41 10,685.00 10,683.59 PUP 7 29.0 L-80 DWC/C 20.77 10,683.59 10,662.82 Jts Casing 1:143 7 29.0 L-80 DWC/C 5,839.46 10,662.82 4,824.77 XO PUP 7 29.0 L-80 DWC/C Ten 14.46 4,824.77 4,810.31 Low Quick Connect 7 29.0 L-80 Ten Blue 2.42 4,810.31 4,807.89 Upper Quick Connect 7 29.0 L-80 Ten Blue 3.08 4,807.89 4,804.81 Liner Set Sleeve 7 29.0 L-80 Ten Blue 8.67 4,804.81 4,796.14 Method Used To Determine TOC: Csg Wt. On Hook: 197,000 Type Float Collar: No. Hrs to Run: 36 Csg Wt. On Slips: 197,000 Type of Shoe: Reamer Casing Crew: Weatherford Rotate Csg X Yes No Recip Csg X Yes _ No 10 Ft. Min. 13 PPG Fluid Description: OBM Lead Slurry Liner hanger Info (Make/Model): Baker Liner top Packer?: X Yes No Liner hanger test pressure: 3000 Floats Held Yes X No Centralizer Placement: Tail Slurry Lu Type: G CEMENTING REPORT Shoe @ FC @ Top of Liner Preflush (Spacer) Type: Density (ppg) Volume pumped (BBLs) Lead Slurry Type: Sacks: Yield: Density (ppg) Volume pumped (BBLs) Mixing / Pumping Rate (bpm): Tail Slurry Lu Type: G Sacks: 316 Yield: 1.45 a Density (ppg) 14.5 Volume pumped (BBLs) 81 Mixing / Pumping Rate (bpm): 2 e Post Flush (Spacer) LL Type: Density (ppg) Rate (bpm): Volume: Displacement: Type: OBM Density (ppg) 8.8 Rate (bpm): 8 Volume (actual / calculated): 54/54 FCP (psi): 2250 Pump used for disp: Rig Bump Plug? Yes X No Bump press _ Casing Rotated? Yes X No Reciprocated? Yes X No % Returns during job Cement returns to surface? Yes X No Spacer returns? _Yes X No Vol to Surf: 0 Cement In Place At: 21:30 Date: 10/16/2019 Estimated TOC: 0 Method Used To Determine TOC: www.weliez.net WellEz Information Management LLC ver 04818br 26" 13-3/8" 9-5/8" Granite Point Field Well: GP 55RD Last Completed: Future Current Schematic PTD: 219-103 Hilcorp Alaska, LLC API: 50-733-20479-01-00 RKB =132' CASING DETAIL Size Wt Grade Conn ID Top Btm 26" Conductor Whipstock (Not Pictured) Surf 306' 13-3/8" 68 K-55 BTC 12.415 Surf 1,318' 9-5/8" 53.5 P-110 BTC 8.535 Surf 4,997' 7" 26 L-80 DWC/C 6.276" 4,796' 10,395' (TOW) TUBING DETAIL 2-7/8" 6.4 L-80 IBT 2.441 1 Surface 492' c C, JEWELRY DETAIL y µ 5 bbls pumped on top of - Depth Retainer Est TOC @ No (MD) Item 1 10,395' Whipstock (Not Pictured) y µ 5 bbls pumped on top of - Retainer Est TOC @ 10196ND •� a-yc.'5 �# >! Ij Retainer 10,327 MD ti ♦ f � 106 bbis pumped / belaw Retainer C' PBTD: ±10,196'MD TD: 10,756 MD C-4 Updated By: CJD 12/5/2019 Hilcorp Energy Company Composite Report Well Name: GPF GP-55RD Field: Granite Point County/State: , Alaska (LAT/LONG): avation (RKB): API #: Spud Date: Job Name: 1911669D GP-55RD Drilling Contractor Spartan 151 AFE #: AFE $: Activit �r Date.: f3p� Stingeiaty.,.. - ... . ..:.. .... .... 6/23/2019 Remove dry hole tree, N/U riser to well head. N/U Mud Cross, Double gate BOPE and Annular to riser.;Rig up jacks and skid rig over well GP -55. Run power cable and connect same to Accumulator building. 06/24/19 Witness of Initial BOP test verbally waived by Jim Regg 06/23/19 @ 16:02.;PJSM. Raise and scope up mast. R/U floor, beaver slide, stairs etc. R/U Accumulator hoses.;Build 3.5" test joint, attempt shell test of BOPE, chase leaks. Fill pits with FIW 6/24/2019 Complete tightening of hub flange on riser. Shell test BOPE w/ 2500 psi.;Test BOPE as per AOGCC & Hilcorp requirements. AOGCC witness waived by Jim Regg 6-23-19 @ 16:02 hr. Test w/ 3.-1/2" test jt. Bag 250 low / 2500 high. Blind rams, pipe rams, ck. & kill line valves & ck. manifold 250 low / 3500 high. Function test accumulator, manual & remote ck. valves . Good Test.;Pull test plug and rig down test equipment.;HPU down with bad wire. C/O units and swap hoses to new unit.;Break down test joint and valves with HawkJaw.;UD test joint and load pipe in Beaver slide. Crane Swapping out full ISO tanks with empties off of boat between loads.;P/U 9-5/8" scraper assembly, 8.5" bit and RIH picking up 3-1/2 in. 12.95# PH -6 work string;Fix hydraulic leak on accumulator hose, fitting leaking on kill line. Replace hose;RIH picking up 3-1/2 in. 12.95# PH -6 work string to 3430FT. Stop at 2500Ft and establish reverse circulation. Continue to check reverse circulation every 20 joints, check up and down weight every 10 joints;RIH picking up 3-1/2 in. 12.95# PH -6 work string from 3430FT to 4,864'. Tagged plug R/U to circulate out WBM and swap to FIW 6/25/2019 PJSM with all parties involved on displacing WBM to ISO tanks with FIW.;Reverse circulate out 9.6# WBM w/FIW taking returns to ISO tanks. Initial circulating pressure 1150 psi @ 3 bpm, at highest pressure was 1840 psi @ 2.2 bpm. Final pressure was 490 psi @ 4 bpm.;Waiting on tide to swap out ISO tank on boat. Service rig and rig up to test casing while waiting.; Complete displacement of 9.6# WBM w/ FIW. 670 psi @ 5 bpm.;POOH to 4761';Set up test pump, fluid pack well and begin pressuring up for casing test.;Test 9-5/8 casing to 3500 psi for 30 minutes - Charted. Good Test;POOH laying down 3-1/2" work string. UD 9 5/8" scraper and 8.5" bit;Clean and clear the rig floor. R/D wind walls, stairs, rig floor, beaver slide. R/D accumulator lines and checked pre - charge pressures in accumulator bottles. Prep for scoping down derrick;Scope derrick down to half mast. Skid rig 12ft north to allow access to GP -52 with crane;N/D GP -52 wellhead and remove tree with crane;N/D BOPE from GP -55 and N/U to GP-52;N/U Wellhead on GP -55. R/U Accumulator, choke, and kill lines. Fluid pack wellhead for test;R/U and test wellhead to 1500 psi 9/13/2019 Prep and move rig VGP-53RD to GP-55RD.;N/D Dry Hole tree from well head. Install 13-5/8" 5K Hub by 11" 5K Flange adapter spool.;Land riser w/ 11" 5 k X 13-5/8" 10 k DSA on wellhead adapter spool and M/U bolts on same.;Set BOP on riser and M/U bolts on same. Install bell nipple. Check hub and all flange bolts again after BOP'S in place.;Change out Top Drive saver sub, lower IBOP valve and dies in "grabber". Re -sequence hydraulics to break out, had to C/O 2 of 4 sequencing cartridges. C/O swivel pkg. Simultaneously cleaning starb. flow trough.;Clean 5" liner run tools from last well, make ready ship to beach, clean and clear rig floor all unecessary equipment, clean wellhead room, clean trough to shakers, C/O shaker screens to 170s.;P/U 8-3/8 clean out BHA, stand back in mast.•M/U test plug in prep for BOP test. 9114/2019 R/U and shell test BOPE w/ 3500 psi- Good Test, Checked accumulator bottles pressures and calibrated gas alarm sensors.;Straighten and clean up rig floor while waiting on Brian Bixby w/ AOGCC to arrive to witness initial BOP test.;Test BOPE per Hilcorp, Spartan and AOGCC standards. Test Rams, Valves and Annular to 250 psi low / 3500 psi high f/ 5 min each on chart. Perform function test on Accumulator, PVT and gas detector alarms, manual and both hyd. chokes. No Failures. Witnessed by AOGCC Inspector Brian Bixby.;R/D test equipment and clear rig floor of same.;lnstall wear bushing .;R/U and M/U 8-3/8" clean out BHA, P/U 3 jt. 5" HWDP and 12 jt. 5" DP. Continue to RIH w/ 5" pipe out of the derrick, tag up at 4875 ft.;PJSM all personnel including GP platform foreman. Topic: Displace wellbore OBM, contingencies and possible hazards.;Commence displace 9-5/8 wellbore to OBM. Total 301 bbls, linear pressures, no stops or re -starts. Fluids balanced DP and annulus.;PJSM, test 9-5/8 csg 2500 psi - 10 min. Test successful, no re-tests.;Drill cmt and float equip 4875 - 5031 ft. Hard, dense cement.;Drill ahead 8-3/8 hole new formation for FIT, 5031 - 5044 ft. 9/15/2019 Drill new hole to 5051' 73RPM, 5.2 TO, 18 WOB, 272 gpm, 500 psi.;Perform FIT to 13 ppg EMW = 9.1 ppg MW w/ 810 psi. - Good test.;Pump dry job.; POOH for Rotary Steerable Drilling Assembly.; M/U BHA #2, Rotary Steerable w/ OnTrak-MWD as per DD.;Work boat with crane before tide changes. Swap out empty LVT ISO with full one. Load out 2 full cuttings boxes.;Continue M/U BHA #2 as per DD.;RIH w/ BHA #2, picking up 135 jt. 5" DP.;Wash and ream 5006 - 5051 ft. Take no wt, wellbore free.;Downlink MWD, drill ahead 8-3/8 hole RSS OnTrak, 5051 - 5241 ft. WOB 22.5, RPM 112, GPM 460, SPP 1738.; Transported to KGF G&I: Offloaded Solids = 72 Cumulative Solids = 72 9/16/2019 Directional drill 8-3/8" hole w/ RSS OnTrak f/ 5,241'- 5,448' WOB 19-22, RPM 112, TO 6.5, GPM 504, SPP 1918, ECD 10.3, PU 160, SO 140, ROT 150.; Directional drill 8-3/8" hole w/ RSS OnTrak f/ 5,448'- 5,723' WOB 20-21, RPM 112, TO 6-7, GPM 502, SPP 1920, ECD 10.2, PU 160, SO 140, ROT 150.; Directional drill 8-3/8" hole w/ RSS OnTrak f/ 5.723'- 5887' WOB 21 - 22, RPM 112, TO 6-7, GPM 502, SPP 1925, ECD 10.2, PU 160, SO 140, ROT 150.; Directional drill 8-3/8" hole w/ RSS OnTrak f/ 5887'- 6135' WOB 21 - 22, RPM 112, TO 6-7, GPM 502, SPP 1925, ECD 10.2, PU 160, SO 140, ROT 150.; Transported to KGF G&I: Offloaded Solids = 117 Cumulative Solids = 189 9/17/2019 Directional drill 8-3/8" hole w/ RSS OnTrak f/ 6135' t/6365' WOB 21 -22, RPM 112, TQ 6-7, GPM 502, SPP 1925, ECD 10.2, PU 160, SO 140, ROT 150.; Directional drill 8-3/8" hole w/ RSS OnTrak fl 6365' t/6450' WOB 18- 22, RPM 100 to 115, TO 6-7, GPM 525, SPP 2200, ECD 10.3, PU 160, SO 140, ROT 150. Canrig equip went down.;Contact Canrig tech and trouble shoot system. Can't get system going. Bring Canrig tech back to rig and he arrived at 1700 hrs. Circ and work pipe while trouble shooting.;Pump dry job and short trip back to shoe while trouble shooting Canrig system. [Got Canrig system running at 1930 hrs.] Wellbore good condition, normal up drag, no swab, gain, Ioss.;Service rig.;Flow check, PJSM, RIH 5" DP 4940 - 6450 ft. Precaution wash - ream 90 ft to btm. No fill. No gain - loss.; Directional drill 8-3/8" hole w/ RSS OnTrak f/ 6450 - 6718' WOB 15 - 20, RPM 120, TO 7-8, GPM 558, SPP 2475, ECD 10.5, PU 190, SO 150, ROT 170. Note: Drill at reduced GPM while clean flowline troughs to shakers. 6541 - 6560 ft.;Transported to KGF G&I: Offloaded Solids = 162 Cumulative Solids = 351 9/18/2019 Directional drill 8-3/8" hole w/ RSS OnTrak f/ 6718 - 6920' WOB 15 - 25, RPM 110 - 130, TO 6.5 - 8, GPM 570, SPP 2550, ECD 10.5, PU 200, SO 160, RT Wt 180. Had issues keeping our ROP up until we raised the bit wt to 25k.; Directional drill 8-3/8" hole w/ RSS OnTrak f/ 6920' t/ 7103', WOB 20 - 25, RPM 120 - 130, TO 6.5 - 8, GPM 570, SPP 2550, ECD 10.5, PU 200, SO 160, RT Wt 180. Pumped 20 bbl high vis lube sweep at 6943' with no increase in cuttings. Lost a swab on #1 mud pump and had to swap to 2 & 3.; Directional drill 8-3/8" hole w/ RSS OnTrak f/ 7103' t/ 7106', Lost ROP and made numerous attempts to get it back drilling to no avail.;Mix and pump dry job.; PJSM, flow check, POH 5" DP for bit, 7106 to BHA at 581 ft. Wellbore exc condition. Normal drag, no swab - gain - Ioss.;Handle BHA #2, break and grade bit #2. (1, 1, No, A, X/1, In, No, PR), Download and stand back OnTrak assy. NOTE: While pulling drill collar slips, 3 slip dies came loose from slip bodies and fell down hole.;Decision made to RIH tri-cone mill tooth bit in order to drill up and or push aside junk into formation. Handle BHA #3, (8-3/8 tri-cone assy.). Re-arrange BHA on rack, re-position stabilizer to 30 ft above bit. RIH same. (Bit, bit sub, jt HWDP, stab).;Flow check, follow BHA with 5" DP to 4085 ft at 0600 hrs. 9/19/2019 RIH w/ junk clean out run to 7000'.;Wash to bottom looking for junk. Wash to bottom several times and work pipe off bottom looking for junk. Didn't see any indication of junk on bottom.;Drill 8 3/8 hole f/ 7106'V 7190', 455 GPM, 1730 Psi, 105 RPM, 6.5 to 7.5 TO, 15 to 25 WOB.;Circ hole clean while keeping pipe moving. 100 RPM, 525 GPM, 1945 Psi.;Check flow, Pump dryjob, and POH to BHA. Didn't have any issues in open hole and hole fill was good. Had an overpull in the csg at 2750' that could have been a slip dye.;Clean and clear rig floor.;M/U BHA #4, Bit #4 (OnTrak RSS ASSY) UD jars and replace (Excessive Leaking Through Weep Hole), RIH same.; Flow check, follow BHA with 5" DP (P/U 45 jts in Singles) to 2400 ft.;Shallow test MWD. Test successful.;Service Rig.;Flow check, RIH 5" DP, 2400 - 7000 ft.;Bring pumps on line, down link tools, re-log new 8-3/8 hole 7100 - 7190 ft. NOTE: No junk in hole encountered entire trip in hole. Wellbore exc condition, normal do drag, no obstruction, no gain - loss. Trip gas 115u.;Drill ahead 8-3/8 hole with OnTrak RSS, 7190 - 7250. WOB 20-25, RPM 125, GPM 550, SPM 160, SPP 2400, Tq 7200. No gain - loss, cuttings normal quantity - quality. BG gas 24u.;Transported to KGF G&l: Offloaded Solids = 136 Cumulative Solids = 487 9/20/2019 Drill 8-3/8" hole with OnTrak RSS, f/ 7250't/ 7492'. = 40 FPH. WOB 15-22, RPM 110 - 125, GPM 550, SPP 2400, Tq 7500 to 8900, MW 9 ppg, ECD 10.4.;Drill 8-3/8" hole with OnTrak RSS, f/ 7492't/ 7783'. = 48.5 FPH. WOB 15-24, RPM 105 - 130, GPM 545, SPP 2330, Tq 7500 to 9400, MW 9 ppg, ECD 10.3. [Unload 2 cmt pods and cementers off boat. Offload pods and put them back on the boat.];Re-cip drill string while clean flow line troughs to shakers. Sludge build up, cannot flow OBM without possibility of overflow and spill. Fabricate flow line jet manifold.; Resume Drill 8-3/8" hole with OnTrak RSS, f/ 7783 - 8163'. = 50 FPH. WOB 15-22, RPM 110 - 125, GPM 550, SPP 2400, Tq 7500 to 8900, MW 9 ppg, ECD 10.3 Connectons free, normal drag, no gain - loss, cuttings returns normal quantity - quality. BG Gas 37u.; Transported to KGF G&I: Offloaded Solids = 85 Cumulative Solids = 572 9/21/2019 Directional Drill 8-3/8" hole with OnTrak RSS, f/ 8163't/ 8373'. = 35.3 FPH. WOB 15-24, RPM 110 - 125, GPM 535, SPP 2365, TO 7500 to 10,000, MW 9 ppg, ECD 10.3. Backreaming a full std before every connection.; Directional Drill 8-3/8" hole with OnTrak RSS, f/ 8373't/ 8448'. = 30 FPH. WOB 15-24, RPM 110 - 125, GPM 551, SPP 2485, TO 7500 to 10,000, MW 9 ppg, ECD 10.4.;Circ bottoms up. Check flow, and pump dry job.;Short trip to 7190'. Pulled 20k over coming through tight spots f/ 7400't/ 7350'. pulled 10k over pulling through at 7245'. Both spots were coals. Took 10 to 15k going back through 7350' t/ 7400'. Wash last std to bottom and had 2' of fill.; Directional Drill 8-3/8" hole with OnTrak RSS, f/ 8448' t/ 8498'. = 33.3 FPH. WOB 15-24, RPM 110 - 125, GPM 547, SPP 2500, TO 7500 to 10,000, MW 9.1 ppg, ECD 10.5.; Directional Drill 8-3/8" hole with OnTrak RSS, f/ 8498 - 8930'. = 40 FPH. WOB 15-24, RPM 110 - 125, GPM 550, SPP 2450, TO 7500 to 10,500, MW 9.1 ppg, ECD 10.1. Connections free, normal drag, no gain - loss, cuttings returns normal quantity - quality. Trip Gas 65, BG Gas 34u.;Transported to KGF G&I: Survey 8795 MD, Inc 13.31, Az 268.78, TVD 7643, VS 3091, .5 ft Low, 5 ft Left Offloaded Solids = 198 Cumulative Solids = 770 9/2212019 Directional Drill 8-3/8" hole with OnTrak RSS, f/ 8930't/ 9088'. = 26.3 FPH. WOB 15-24, RPM 110 - 125, GPM 544, SPP 2490, TO 8500 to 11,100, MW 9.1 ppg, ECD 10.2. [ 45 hrs & 325 Krevs on bit at noon.].; Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9088't/ 9245'. = 26 FPH. WOB 15-24, RPM 98 - 125, GPM 544, SPP 2490, TO 8,500 to 12,200, MW 9.1 ppg, ECD 10.2. [When we hit a hard spot we back off on the flow rate until the torque starts to increase].; Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9245 - 9390'. = 25 FPH. WOB 15-24, RPM 98 - 125, GPM 508, SPP 2290, TO 8,500 to 12,200, MW 9.1 ppg, ECD 10.2.; Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9390 - 9550'. = 25 FPH. WOB 15-20, RPM 95 - 125, GPM 508, SPP 2290, TO 8,500 to 12,200, MW 9.1 ppg, ECD 10.2.; Hole Position at last survey = 0.45' Low / 3.56' Right Transported to KGF G&I: Offloaded Solids = 153 Cumulative Solids = 923 9/23/2019 Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9550't/ 9692'. = 23.6 FPH. WOB 15-25, RPM 95 - 125, GPM 502, SPP 2270, TO 9,000 to 13,000, MW 9 ppg, ECD 10.1.; Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9692't/ 9816'. = 20.6 FPH. WOB 10-25, RPM 95 - 125, GPM 485, SPP 2150, TO 9,000 to 13,100, MW 9 ppg, ECD 10.1. [70 hrs & 500 Krevs at 1800 hrs.] Started bringing on 7" csg at 1530 hrs.; Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9816 9962'. = 25 FPH. WOB 10-25, RPM 95 - 125, GPM 495, SPP 2185, TO 9,000 to 13,100, MW 9.1 ppg, ECD 10.1.; Directional Drill 8-3/8" hole with OnTrak RSS, f/ 9962 - 10,078'. = 25 FPH. WOB 10-25, RPM 95 - 125, GPM 495, SPP 2185, TO 9,000 to 13,100, MW 9.1 ppg, ECD 10.1. Connections free, normal drag, no gain - loss, cuttings returns normal quantity - quality. Conn Gas 60, BG Gas 20u.;Hole Position at last survey = 5.65' Above / 3.38' Left Transported to KGF G&I: Offloaded Solids = 144 Cumulative Solids = 1167 9/24/2019 Directional Drill 8-3/8" hole with OnTrak RSS, f/ 10,078't/ 10,221'. = 23.8 FPH. WOB 10-25, RPM 95 - 125, GPM 502, SPP 2293, TQ 9,500 to 14,100, MW 9 ppg, ECD 10. Pumped high wt high vis sweep at 10,150'. Sweep came back on time w/ a 15% increase in fines,; Directional Drill 8-318" hole with OnTrak RSS, f/ 10,221' t/ 10,292'. = 11.8 FPH. WOB 10-25, RPM 95 -125, GPM 502, SPP 2293, TQ 9,500 to 14,100, MW 9 ppg, ECD 10.1. Got into the C5 sand and ROP slowed way dn.;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 10,292't/ 10,340'. = 10.7 FPH. WOB 10-25, RPM 95 - 125, GPM 502, SPP 2157 psi, TQ 9,500 to 14,100, MW 9 ppg, ECD 10.1. Backream full std.;Pumped high wt high vis lube sweep at 10,333'. No cuttings increase w/ sweep back at shakers. AOGCC given 48 hrs notice of upcoming BOP test on 09-27-2019 1:00 AM.;Directional Drill 8-3/8" hole with OnTrak RSS, f/ 10,340' t/ 10,341'. = 1 FPH, WOB 10-25, RPM 95 - 125, GPM 502, SPP 2157 psi, TQ 9,500 to 14,100, MW 9 ppg, ECD 10.1. Torqued up to 16K & lost all returns.;Racked back one stand. Picked up 50' above bottom. Recip pipe. Began filling backside wl seawater, while building 35 bbl @ 45 ppb LCM pill. (Baracarb, steel seal) Pumped pill slowly out bit w/ no returns. (Building second pill simultaneously.) Backside filled -150 bbls SW.;Backside filled when LCM pill was outside bit. Chasing w/ 2nd pill. Slight returns. Tried 5 rpms w/ 16K TQ. Stopped rotary. PU one more stand to 10,205'. Finish spot second pill outside bit. Call town to discuss plan forward. Downhole Losses 516 bbls MOBM, 628 bbls SW.;Work & reciprocate & rotate DP f/ 10,205't/ 10,341'. Stage pumps each stand monitoring returns. Break out & set back 2 jts from last stand in mousehole. Stage pumps to 300 gpms w/ full returns.;Drill 8-3/8" hole with OnTrak RSS, f/ 10,341't/ 10,347'. = 6 FPH. WOB 1 K, RPM 66, GPM 301, SPP 1748 psi, TQ 6900K, MW 8.7 ppg, Full returns. Pump 35 bbl LCM pill & spot outside bit.;POOH f/ 10,347' t/ 10,163' while circulating good MOBM to surface. PU 323 K, RPM 2, GPM 211, SPP 363 psi, TQ 5900K, MW 8.5 ppg, Full returns.; Transported to KGF G&I: Offloaded Solids = 108 Cumulative Solids = 1275 9/25/2019 Work pipe f/ 10,121't/ 10,208' pumping saltwater at 175 GPM & 300 Psi, While getting OBM treated and ready for displacement. Lost 30' of hole due to water reacting to formation while working pipe.;Displace well to OBM taking saltwater back and shipping it to production at 4 BPM. Pumped 464 bbls of the seawater returns to production then took the rest of the returns back to mud pit slop tank.;With hole full of OBM brought circ rate up to 290 GPM, 1350 psi and started reaming f/ 10,155'. to 10,180'. Having pack off issues so we slowed the pump rate do to 177 GPM, 905 Psi, 80 RPM. Ream to 10,185' while mud getting warmed up and sheared.;Work pumps up to drilling rate of 480 GPM, w/ 2275 Psi, 90 RPM, 15-16K TQ. Down link baker tools to confirm blades are retracted. Circ & Cond MOBM. Adding LVT to active system. (LVT @ bit 19:00 hrs) Balancing MW in & out to 8.7 ppg. Wash & ream t/ 10,187'.; Begin losing MOBM to hole. Slow pumps to 400 gpm. 1521 PSI, 92 RPM. 15-16K TQ. Continue losing to mud hole. Reduce flow to 300 GPM, 1100 PSI, 80 RPM. Continue losing mud to hole. Reduce pumps to 200 GPM, 550 PSI. No Iosses.;Staged pump rate to 405 GPM, 1800 PSI, 90 RPM. Wash & ream t/ 10,187'. Packing off & inducing losses. Flow out f/ 36% t/ 26%. Pumped 55 bbl hi vis LCM pill. Reduced pump rate to 200 GPM, 650 PSI. Losses slowed but continued. 24 hr losses to hole = 126 bbls.;Mix & pump 55 bbl hi vis LCM pill. Spot outside bit @ 10,180'.;Check flow. Well static. POOH f/ 10,180' t/ 6,600'. Pulled 20K over @10,041'. Not getting correct hole fill. (2 out of 4 bbls per 5 stds) Well static.; Circulate B/U @ 6600'. Stage pumps f/ 205 GPM, 475 PSI. No losses. 300 GPM, 775 PSI. No losses. 421 GPM, 1400 PSI. No losses. Max Gas 110 units.;Check flow. Well static. POOH f/ 6600't/ 4912', inside csg shoe. Slick TOH.;Clean & clear rig floor after TOH. Prep to slip & cut drill Iine.;Transported to KGF G&I: Offloaded Solids = 72 Cumulative Solids = 1347 9/26/2019 Finish cleaning floor and prepping to cut drilling Iine.;Cut and slip drilling line. Service rig.;Flowing back over DP so mix and pump dry job.;POH to BHA. Stand back HWDP . Monitor well.;Work BHA. Stand back flex collars w/ stab. LD filter sub, and float sub. PU and break bit. Bit was a 1-1-I. [Pictures in o -drive], Down load MWD. tools were plugged so we layed everything dn. [Tested gas alarms].;Drain stack, pull wear ring, and set test plug. MU test jt. Well start to flow and built up to a 2" stream. Shut ann valve and pull test plug. Fill stack within 1" from top of the riser and monitor well. after 15 min well started flowing over riser. LD test jt.;PU & MU Cleanout BHA #5 w/ stand of flex collars w/ stab, float sub, and bit. RIH w/ HWDP. Cont RIH t/ 2047'. Not getting proper returns. Slight losses static. Fill pipe. Continue RIH @ <100 fpm to 4978'. Slight static Iosses.;Stage pumps - 100 GPM / 151 PSI, 200 GPM / 318 PSI, 300 GPM / 556 PSI, 400 GPM / 1027 PSI. Full returns, No losses. Running degasser. Max Gas 444 units. MW in 8.8 ppg. MW out 8.7 ppg. Ditch 8.6 ppg. Circ surf to surf. Stop pumps. Monitor well. Hole static.;Weight up active system @ 4968' to 8.9 ppg MW in & out. 200 GPM / 321 PSI, 280 GPM / 595 PSI, 407 GPM ! 1114 PSI . Max gas 47 units. Adding backround LCM during circulation. No losses while pumping.;Monitor well. Flowing pencil thin but steady stream . Build & pump 50 bbl slug w/ 11.9 ppg MW. Prep to POH 10 stds to monitor well.;Transported to KGF G&I: Offloaded Solids = 36 Cumulative Solids = 1383 9/27/2019 Pull 10 stds to about 4000' so we can monitor well for flow after spotting 50 bbl 11.9 slug.;Monitor well for flow. Well stayed static for about 15 min. Then we had had a slow seepage the kept increasing to a stronger flow. Discussed options with town and decided RIH and condition mud then clean out fill.;RIH 10,105' filling pipe every 2500'.;MU TD and break circ. Start out at 200 GPM and 650 psi. Work pipe do to 10,130' then back up to 10,105' getting everything moving good. Increase flow rate to 300 GPM 1200 psi. work pipe do to 10,143' where it started taking wt. PU and start reaming slow f/ 10,138't/ 10,190'.;At 10,190' the pressure started falling off and then the flow fell off. Next the pipe torqued up and stalled. Shut the pump do and backed the trapped torque out. PU to 360k with no movement the back do to 200k with no movement. Fluid fell 6' down in ann and stopped there.; PU to 275k, Set rotary torque limiter at 22k. Kicked rotary in and dropped pipe do to 250k where it broke loose rotating at 20k. Kept it rotating and inched it up backreaming with no circ or pump up to 10,175'. Then we inched it back down to 10,176'. Shut do rotary and pulled up to 375k.;Didn't break loose. Slacked back off to 200k and it looked like we had slight movement. PU to 390k and pipe pulled free. Pulled pipe up to 10,105' but we still didn't have circ. Slack off to 10,150'. PU pipe at a high rate and run the pump up to 70 spm. Shut pump do when pipe got back to 10,105'.;Slack back off with no pump and stroke back up with the pump several times and finally regained full circ. Total 18 bbls downhole Iosses.;Circ gas out and get mud all evened out at 9.1 ppg [High gas 770 units].;Shut do and monitor well. Looks like gas is still breaking out so we resumed circ.;Monitor well and it had a very slight flow. We believe the well is breathing. Pull 10 stds and the first 4 stds pulled dry.;Monitor well- Static. Pump dry job. POH. Rack back & LD BHA #5 per Baker. Monitor well - Static. Check Saver Sub - Good.;Clean & Clear rig floor. Prep to test BOPs. Drain stack. M/U test joint, set test plug and R/U to test BOPE. Very slight but steady trickle at wellhead annular valve into bucket. (1 gal / hr) Line up annular valve to Trip Tank for head pressure & monitor well for flow during testing.;Begin testing BOPE as per AOGCC and Hilcorp requirements. AOGCC witness of BOP test waived by State Inspector Mr. Jim Regg 9/25/19 @ 08:03 am. Rams and valves tested 250 psi low / 3500 psi high. Annular tested 250 psi low / 2500 psi high w/ 4" and 5" test joints. Tests charted and held for 5 min ea.;Transported to KGF G&I: Offloaded Solids = 18 Cumulative Solids = 1401 9/28/2019 Finish testing everything on 5". Swap test jts to 4". Test annular, upper pipe rams, IBOP, and floor valve. All test passed. Witness of test was waived by Jim Regg.;RD test equip. and clean floor.;Unload tbg and equip off the boat and get the floor ready for tbg equip. Got centrifuge rigged up taking mud from ISO, cutting wt back, and putting the mud back into the rig pits.;Get tbg tongs on the rig floor. Get everything ready to PU tbg.;PU defuser and 30 jts of 3 1/2, 9.2 Ib tbg. MU XOs and 1 std of 5" DP.;RD tbg tongs and RU Hawkjaw. RIH w/ 5" DP t/ 5000'.;Circulate BU. Stage pumps to 300 GPM / 545 PSI. No losses. Max Gas 155 units. Running centrifuge while circulating. 9.05 ppg MW in & 8.9 ppg MW out.;Continue RIH on 5" DP f/ 5000't/ 10,107'.;Circulate BU. Stage pumps to 300 GPM / 881 PSI. No losses. Max Gas 260 units. Running centrifuge while circulating. 9.05 ppg MW in & 9.15 ppg MW out.;RIH & wash U 10,164'. Stacking weight. PU to 10,162'. Good hole. RU for cement job. SLB prepping mix water. Moving computer set up due to rain.;Finish R/U Schlumberger. Hold PJSM. Schlumberger pumped 10 bbis sea water, test lines to 2500 psi, Pump 15 bbis 12.5 ppg mudpush w/ rig. SLB Batch up and pump 34 bbls 15.8 ppg cmt. Centrifuged ISO tank used whole mud to active pits.;Swap to rig and pump 5 bbis 12.0 ppg mudpush, and displace with 144 bbls 9.05 ppg OBM.;RD Cement circulating valves & hose. POOH 8 stds @ -30 fpm f/ 10,162' to 9347'. Cmt in place at 05:30 hrs w/ a final pressure of 200 PSI @ 160 GPM.;Drop foam ball. Begin circulate out cement stinger & cleaning up hole. 381 GPM, 1327 PSI.; Transported to KGF G&I: Offloaded Solids = 36 Cumulative Solids = 1437 9/29/2019 Continue cir bottoms up to clear pipe of cmt. Did see traces of the cmt spacer on bottoms up. Pump dry job.;PU and break do cmt head. Clear tools off floor.;POH to tbg.;RD DP equip & RU tbg equp. LD 8 jts 3 1/2 tbg. Secure well so hands could help with deck water management.; Rain was building up on the decks and we were not able to keep up with just the rstbs. Got all the hands working on pumping the decks so we didn't cause a spill to the inlet due to heavy and constant rain. Finally got everything caught up.;Continue POH LD 3 1/2 tbg cmt stinger and defuser. Wash out defuser and send to the welder for clean out.;RD tbg equip, clean floor, and RU to PU drilling BHA.;Service rig, Grease up TD, Blocks, Crown, and drwks. Prep to PU BHA #6.;PU & MU Kick Off BHA #6 w/ 1.5° bend Motor & OnTrak MWD. (C/O inserts fl 1.3° t/ 1.5°) Scribe Motor. MU 8 3/8" Kymera bit. Upload MWD. MU Jars & HWDP.;RIH w/ Kick Off BHA #6 w/ 1.5° bend Motor & OnTrak MWD on 5" DP t/ 5242'. Fill pipe per -25 stds.;Test MWD. - Good test. Circulate BU. 451 GPM, 1811 PSI. 9.05 ppg MW in, 9.0 ppg MW out.;RIH wl Kick Off BHA #6 w/ 1.5° bend Motor & OnTrak MWD on 5" DP f/ 5242't/ 8626'. Fill pipe per -25 stds.;Transported to KGF G& I: Offloaded Solids = 36 Cumulative Solids = 1473 9130/2019 Fill pipe at 5242' and continue RIH to 9225'.;Wash do to 9570' and started running into stringers. Started washing and reaming at 9617' where it was holding more wt. Cleaned out soft cmt do to 9813' where it held 10k while rotating and pumping 300 GPM at 1430 psi. Hard cmt at 9813'.; Orientate motor and started troughing f/ 9788't/ 9812'.;Time drilling at 17hr f/ 9,812'V 9,816'. Getting back 95% cmt and 5% siltstone and coal. Pumping 516 GPM, 2700 Psi. MW 9.1 ppg, ECD 10.1 ppg.;Time drilling at 1 Yhr f/ 9,816't/ 9,818'. Getting back 94% cmt and 6% siltstone and coal. Pumping 517 GPM, 2700 Psi. MW 9 ppg ECD 10.1 ppg.;Time drilling at 17hr f/ 9,818't/ 9,822'. 94% cmt and 6% siltstone and coal. Pumping 517 GPM, 2700 Psi. MW in 9.0 ppg / out 9.0 ppg. ECD 10.0 ppg.;Time drilling at 27hr f/ 9,822't/ 9,830'. 70% cmt and 30% siltstone / sandstone. Pumping 523 GPM, 2709 Psi. MW in 9.0 ppg 7 out 8.9 ppg. ECD 10.0 ppg.;Time drilling at 37hr f/ 9,830't/ 9,838'. 40% cmt and 60% siltstone, sandstone & coal. Pumping 527 GPM, 2737 Psi. MW 9.0 ppg in & out. ECD 10.1 ppg.;Time drilling at 47hr f/ 9,838't/ 9,841'. 10% cmt and 90% siltstone , sandstone & coal. Pumping 527 GPM, 2737 Psi. MW 9.0 ppg in & out. ECD 10.1 ppg.;Transported to KGF G&I: Offloaded Solids = 54 Cumulative Solids = 1527 10/1/2019 Time drill at 10'/ hr f/9,841' U 9,860' Getting back 90% formation and 10 % cmt. 530 GPM, 2770 Psi.;Time drill at 20'/ hr (/9,860' t/ 9,870'. Take check shot survey.; Directional drilling f/ 9,870' t/ 9,913'. 520 GPM, 2720 Psi, 40 RPM, 12k TQ.; Directional drilling f/ 9,913' U 10,055'. 520 GPM, 2720 Psi, 40 RPM, 12k TQ. Separation projected at the bit at 10,055' = 30' (Rot= 2.3 hr, Sld=3.3 hr).: Drilling / Slliding 6 1/8" hole f/ 10,055' U 10,120'. 26.7 FPH ROP, 285K PU, 200K SO, 240K RT, 15- 25K WOB, 525GPM, 2971 PSI, MW 9.0 ppg, 10.0 ppg ECD, 0 RPM, 6-7K TQ. Take SPRs.;Drilling / Rotating 6 1/8" hole f/ 10,120' U 10,135'. 30 FPH ROP, 285K PU, 200K SO, 240K RT, 15- 25K WOB, 525GPM, 2971 PSI, MW 9.0 ppg, 10.0 ppg ECD, 43 RPM, 6-7K TQ. Take survey.; Drilling / Slliding 6 1/8" hole f/ 10,135't/ 10,174'. 9.75 FPH ROP, 285K PU, 200K SO, 240K RT, 15- 25K WOB, 525GPM, 2971 PSI, MW 9.0 ppg, 10.0 ppg ECD, 0 RPM, 7-8K TQ. 3.5' Low/ 12.20' Right of Plan.;Sliding @ 10,174' MD, 8982' TVD. Torqued up, stalled out, & lost all returns. Stopped pumps. PU 1 full std off bottom to 10,051'. (325K PU). Filled annulus w/ MOBM. (20 bbis to fill) Monitor hole. Static. Pump @ 1.5 bpm. Establish loss rate of 12 bph.; Pump 25 bbl / 40 ppb LCM pill into drill string. (Lost 18 bbls to hole).;TIH f/ 10,051' t/ 10,164'. Finish pump pill outside bit. Work pipe while allowing pill to set.;Pump 2nd 25 bbl / 40 ppb LCM pill to bit.;PU Single. RIH t/ 10,170'. Stage pumps to 400 gpm w/ 40 RPM. No losses. Wash U 10,174'. Tag bottom. Immediately lost returns. Stop pumps. PU t/ 10,130'. Monitor well. Static. Call town to discuss plan forward.;POH f/ 10,130't/ 9704'. Monitor well on trip tank. Allow LCM pill to set.;Transported to KGF G&I: Offloaded Solids = 54 Cumulative Solids = 1527 Daily Metal from Magnets 0 lbs. Total 17.25 lbs. Daily Losses to hole. 42 bbis 10/2/2019 Monitor well on trip tank w/ bit at 9,704'. Allow LCM pill to set. Hole static.;Pump and spot a 50 bbl LCM pill at bit. at 90 gpm.;RIH to 10,176'.;Drill f/ 10,174' to 10,194', 31 FPH ROP, 285K PU, 21 OK SO, 240K RT, 8-12K WOB, 311 GPM, 1290 PSI, MW 9.0 ppg, 55 RPM, 13.5-14.5K TQ. Initially had 31 % returns that we completely lost once LCM pill was up hole and slowly came back to 23%. Lost 195 bbl MOBM.;POOH 90't/ 10,105' and circulate across top of hole w/ hole fill while monitoring well . Discuss options with town while mixing 2nd 50 bbl 40 ppb LCM pill.;Spot 2nd 40 ppb LCM pill @ bit an drill f/ 10,194 to 10,201'23 FPH ROP, 285K PU, 210K SO, 240K RT, 11-13K WOB, 270 GPM, 1200 PSI, MW 9.0 ppg, 55 RPM, 13.5K TQ. Maintained 23% returns while drilling. Lost 120 bbl MOBM and shut down to build volume.;POOH to 10,090' fill backside with diesel, circulate diesel across top of hole and monitor while building volume. Rate of loss to hole -30 bbl/hr. Discuss current conditions with town and discuss plan forward options.;Continue to circ diesel across top of hole while building volume with LVT and diesel. Make arrangements to use the vessel Red Dog to transport 3 ISO's of MOBM from the beach and to purchase 813 bbl of MOBM from Glacier Oil and Gas. Loss rate declining f/ 12 bph to 0 bph.;Pump MOBM out of shaker pits 1,2 &3 (106 bbl) and bypass same while continuing to build volume with diesel and wt up to 8.8 ppg. Circulating diesel across top of hole . Loss rate @ 0 bph . Offload mud pallets from M/V Red Dog. CO shaker screens to 80s.;Offload 3 ISOs 9.6 ppg MOBM from Glacier O&G + 1 ISO LVT. Build additional 8.75 ppg MOBM volume. Stage products & Build 100 bbl LCM pill in Slug pit 2. Add 55 bbis diesel to Slug pit 1.;Stage pumps to 1.5 bpm to confirm flow. Pump LCM pill chain to bit - 5 bbls slop water from pit 1, 35 bbls pill from Slug pit 2, 5 bbis slop water from pit 1, 35 bbis diesel flush from Slug pit 1, remaining pill from slug Pit 2. Begin chase w/ MOBM w/ 750 stks.;Transported to KGF G&I: Offloaded Solids = Cumulative Solids = 1527 Daily Metal from Magnets 0 lbs. Total 17.25 lbs. Daily Losses to hole. 128 bbls (Thru midnight) 10/3/2019 Continue to displace LCM pill chain to bit.; RIH f/ 10,090' to bottom @ 10,201'.; Break circulation. (Had a bit of trouble getting IBOP valve to open TD) Stage rate up to 275 gpm.; Drill 8-3/8" hole f/10,201' to 10,264', 29 FPH, ROP, 300K PU, 220K SO, 260K RT, 18-20K WOB, 275 GPM, 1200 PSI, 259 psi Diff, MW 8.9 ppg, 43 RPM, 13.5-14.5K TQ. Initial returns of 27% up to 31% and then down to 21%. Fluid loss rate of 84-97 bph.;Spot 10 bbl 40ppb LCM pill on backside of pipe, P/U to 10,105'. Circulate at 90 gpm and monitor well. Zero losses observed. Attempted to pump up survey but was notable to get pulse from MWD tool (suspect turbine or instruments plugged with LCM).;Drill 8-3/8" hole f/10,264' to 10,359', 57 FPH ROP, 300K PU, 220K SO, 260K RT, 16K WOB, 272 GPM, 1200 PSI, 255 psi Diff, MW 8.9 ppg, 47 RPM, 13.5-14.5K TQ. Returns 22-27% Fluid loss rate of 42 down to 24 bph. (Pumped 5 bbl 40 ppb LCM pills every 10' of new hole).;Spot 10 bbl 40 ppb LCM pill on backside of pipe.; POOH to 10,078' and Kelly up.;Stage pumps up to 450 gpm to clean out MWD tool. Survey @ 10,024.59' inst. depth= Inc 15.25°, Az 260.66°.;RIH to 10,352' (had 7' of fill). Wash and ream to bottom @ 10,359'. Took Survey @ 10,216.33" inst depth = 21.41' Inc., 243.54° Az. and Survey on bottom @ 10,310.03" inst depth = 21.87° Inc., 243.85° Az.;Drill 8-3/8" hole f/10,359' V 10,394', 70 FPH ROP, 300K PU, 220K SO, 260K RT, 20-35K WOB, 272 GPM, 1145 PSI, 268 psi Diff, MW 9 ppg, 45 RPM, 14.5K TQ. Returns 24%.;Orient tool face and Slide Drill (/10,394' to 10,408', 8 FPH ROP, 300K PU, 220K SO, 260K RT, 35K WOB, 347 GPM, 1490 PSI, 185 psi Diff, MW 8.9 ppg,.145 rpm @ Bit. Returns 26% , Fluid losses -40 bph. Difficulty holding tool face. Getting low on MOBM volumes. Call town & discuss plan forward.;Rotate & reciprocate drill string while building 70 bbl LCM pill. 31 OK PU, 220K SO, 260K RT, 250 GPM, 577 PSI, 185 psi Diff, MW 8.8 ppg,.140 rpm @ Bit. Returns 26%. Fluid losses -40 bph. Pump 70 bbl LCM lube pill & spot in annulus. (1027' pill length).;POH f/ 10,408' - 9,193' above LCM / lube pill. 31 OK PU. Hole slick. Monitor hole. Slight static Iosses.;Stage pumps to 2 bpm. 123 PSI. No losses while circulating. MW in & out = 8.8 ppg. Add LCM to active system while circulating. Fill trip tank. Stop pumps. Monitor hole. No static Iosses.;Pump 20 bbl slug. POOH f/9,193' V 4,946'. Check hole inside csg shoe. No static losses. 40 fpm running speed. Hole slick. Continue POOH f/4,946't/ 3673'.; Transported to KGF G&I: Offloaded Solids = 54 Cumulative Solids = 1581 Daily Metal from Magnets 0 lbs. Total 17.25 lbs. Daily Losses to hole. 559 bbls 10,4/2019 Continue POOH w/ BHA #6 to 916'.;MOBM from hole fill leaked onto deck of GPP due to wind breaking trap anchor strap allowing tarp to catch on valve handle and open same. Suspend tripping and secure well. All crews engaged in cleanup of spill. Total spilled -32 gallons. Cleaned beams and decking on rig as well as top deck of GPP.;Resume TOH to BHA. Laied down jars.;POH stand back Compressive Drill Pipe and L/D remaining components of BHA #6. (Had to take extra precautions laying down tools from rig floor to deck due to 50 mph winds).;Clean and clear rig floor.;P/U BHA #7. Bit, ATK Steerable Stab, Flex sub w/ S1tab, OnTrak-MWD, MWD-Stab-Mod, BCPM, NM MWD-Sub-Stop.; Upload MWD.;Finish MU BHA, compressive DP, Jars & HWDP. RIH on 5" DP V 761'.;Shallow pulse test MWD @ 761'. 450 GPM, 901 PSI. Good test.;RIH on 5" DP f/ 761't/ 4,924'. Fill pipe per 25 stds. Monitor well. Static.;While waiting on boat with mud products circulate @ 4,924'. 2 BPM, 111 PSI. No losses. Maintain 8.8 ppg MW in active mud system. Check well 04:00. Static. Replace tarp containment across water from Rig to GPP due to wind damage.;Build additional 158 bbls MOBM in pit #2 w/ 80 bbls diesel, 60 bbls oily water, and premix f/ Slug pit #1. Waiting on boats w/ additional ISOs LVT & 9.6 ppg MOBM from Glacier.; Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1581 Daily Metal from Magnets 0 lbs. Total 17.25 lbs. Daily Losses to hole. 559 bbls 10/5/2019 Circulate and monitor well @ 4,924'. 2 BPM, 111 PSI. (No losses) While waiting on boat with mud products.;RIH f/ 4924' to 10,241'. Filled pipe at 7115' and 9579' with no Iosses.;Wash and ream f/10,241' tagging bottom @ 10,400' (8' high) . 1282 psi @ 367 gpm. 116 rpm, 14.6K TO. Initially saw losses of -180 bbl/hr that dropped to 60-70 bbl/hr closer to bottom (lower ECD due to stabilizers being below loss zone).; Directional drill 8-3/8" hole f/ 10,400' to 10,415'. 24 ft/hr ROP, 25K WOB, 139 rpm, 16K TQ, 1341 psi, 391 gpm, 29% Returns, 9.5 ppg ECD. PUW= 300, SOW=220, Rot=250. Loss rate - 60 bbl/hr.;Directional drill 8-3/8" hole f/ 10,415to 10„512'. 23 ft/hr ROP, 25K WOB, 124 rpm, 16.7K TQ, 1468 psi, 403 gpm, 29% Returns, 9.5 ppg ECD. PUW= 310, SOW=220, Rot=250. Loss Rate 40 bbl/hr (384 bbl total losses today). SPR @ 20, 30 & 40 spm : #1 MP 150, 200, 250 psi / #2 MP 125, 175, 250 psi.;Mix 45 bbl LCM pill and lay on bottom of hole. Monitor well (Static).;POOH 10 std to 9579'. 40K over pull @ 10,414', ran back through it and pulled clean 2nd time through. 10-15 over pull @ 10,171'.;Monitor well (Static) Circulate @ 2 bpm, 137 PSI, 310 PU, 220 SO, 250 RT. Waiting on 3 ea. ISO's of MOBM from the Osprey Platform. Losing -8 bph. Slow pumps V 1 bpm. Continue losing -8 - 10 bph. Build & pump 33 bbl LCM pill to backside.; Monitor well. Hole took 12 bbls to fill backside. POH 6 stds above LCM pill f/ 9579' V 9,051'. Hole slick.;Circulate @ 1 bpm, 117 PSI w/ LCM pill dropping to loss zone. Losses to hole -6 bph down to 0 bph. M/V Titan on site 01:50 am. (Next, heading back to Ospry for additional MOBM.) Offload 3 x ISO tanks 9.6 ppg MOBM to mud pits. Blend 110 bbls LVT, 248 bbls MOBM. 150 bbls oily water.;Stop pumps. Reciprocate pipe. Equalize, circulate & agitate pits 2 & 3 for total 537 bbls 8.8 ppg mud on surface. Continue circulate @ 1 bpm. 120 PSI. Begin building 70 bbl LCM pill in Slug pit.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1581 Daily Metal from Magnets 0 lbs. Total 17.25 lbs. Daily Losses to hole. 328 bbls 10/6/2019 Circulate @ 9,051' 1 bpm. 120 PSI. Build 70 bbl LCM pill in Slug pit 2. Pump and spot 10 bbl. of LCM pill in HWDP.;RIH to 10,430'.;Wash and ream to bottom @ 10,505' (Tight hole f/ 10,494' to bottom) Broke circulation slowly working up f/40 gpm to 390 gpm w/ 1800 psi. (Loss rate of - 60 bbl/hr).;Cycle pumps to turn on MWD w/o success. Attempt to surge tool and pump at max rate to open tool with no success. Baker tech services recommended weighted sweep.; POOH 15 std to 9,106' while mixing weighted sweep.;Pump weighted sweep down to above tool @ 89 gpm to min losses. At tool increase rate to 600 gpm to create turb. flow to open and clear tool. No Go . Try surging without luck . Monitor well - loss rate 20 bbl/hr Static. Offloading 3 ISO's of MOBM from Osprey Platform.;Call town and discuss options and determine plan forward. Pump out 2 x ISO's of 9.6 ppg MOBM into pit #2 and load ISO's back onto boat. Blending water and diesel in with MOBM in pit #2 to get to 8.8 ppg. (Total losses last 12 hours = 267 bbl) Total MOBM on surface 598 bbls 8.8 ppg MW.;Also one remaining ISO of 9.6 ppg MOBM starting into pit 2 to build an additional -150 bbis of 8.8 ppg MW.;RIH f/ 9,105't/ 9,855' @ -60 fpm. Stack up hard w/ 30K. (-15' coal seam).;Wash & ream f/ 9,855' V 9890'. Stage pumps to 2 bpm. 180 PSI, w/ 40 RPM. Went smoothly through coal seam w/ no losses.; PU & set in slips. Elevators hung on box upset. Hammer off elevs. Found 1.5” gash in upset & 1/2" piece of metal w/ teeth wedged between elevs & DP. LD bad joint in mousehole. Appears to be metal f/ Hawkjaws "adjustment nut".; Remove elevators off rig floor to grind bad spot. PU & MU another set of elevators.;Circulate @ 9891' w/ 1 bpm, 117 psi and reciprocate pipe while removing hawkjaws f/ rig floor to repair. RU rig spinner hawks. Prep to continue RIH w/ spinner hawks. Continue building mud in pit 2.;RIH f/ 9,855't/ 10,453' @ -60 fpm. PU & work through tight spot @ 10,230'.;Circulate @ 10,461'w/ 1 bpm, 121 psi. Pump 20 bbl LCM pill into drill string. Chase w/ 35 bbls MOBM. Pump 20 bbl diesel pill into string. No Iosses.;Wash do f/ 10,461' to btm staging pumps & rotary to drilling rate. 80 gpm V 415 gpm, 1825 psi, 30 % flow, 40 -100 RPM. 15-17K TQ, 15 bbls loss. 2' fill off btm.;Drill ahead f/ 10,512't/ 10,615'. 415 gpm, 22.9 fph. 1837 psi, 30% flow, 120 RPM, 25K WOB, 17 -20K TQ. (Loss rate of -- 46 BPH down V -30 BPH) Pumping 15 bbl LCM pill w/ lube hourly. No MWD activity. Pump 10 bbl diesel sweep w/ lube trying to clear MWD.;Heavy LCM & cuttings returns at shakers on 3 x BU. Slow pumps to 360 gpm till shakers cleaned up.;Circulate BU @ 10,615' while building LCM pill to spot on bottom.;Transported to KGF G&I: Offloaded Solids = 126 Cumulative Solids = 1707 Daily Metal from Magnets 1 lbs. Total 18.25 lbs. Daily Losses to hole. 309 bbls 10/7/2019 Mix and spot 40 bbl 40 ppb LCM pill on bottom. Observe well - Static.;POOH 15 std. to 9201'.;Observe well (Static). Pump Dry job and fill trip tanks.;Continue POOH to top of BHA. Hole in good condition.; Stand back HWDP, Jars and Compressive drill pipe. Break off and clean out MWD filter sub. Pull up to bit and inspect same (1-1-NO-A-E-1-NO-DTF). Calculated hole fill 88 bbl. Actual fill 92 bbl.; Download and test MWD tools. Both BCPM and OnTrak tools bad. Lay down and replace both tools. Hole taking 4 BPH. PU & RU Hawkjaws on rig floor.;RIH on 5" DP t/ 665'.;Shallow pulse test MWD @ 665'. 450 GPM, 621 PSI. Recycle pumps multiple . Stage pumps to 600 gpms, 30 RPMs. Pump 25 bbl diesel, lube, graphite pill. Stage pumps to 650 gpms. Unsuccessful activating MWD. Ordering back up tool from dock. —30 bbls loss to hole.;POH t/ OnTrak / BCPM. Plug in & reprogram OnTrak tool . LD float sub, filter sub and stop sub. LD BCPM on rig floor. 1/4 cup x 1/2" L x 3/16" thick coal like pieces on top of screen, but screen not packed off. 1/8" W x 4" L screen openings. A few pieces around pulsar below screen.; Lift pin end. Blow air from pin end downhill. A few pieces caught in 5 gal bucket. Blow air from pin end w/ vacuum on box end. Felt pieces in vac hose for 15 sec straight. Repeated process till no more pieces / trash felt in vac hose. Static losses —4 BPH.;MU OnTrak / BCPM, float sub, filter sub and stop sub. MU Compressive DP, Jars & HWDP.;RIH on 5" DP t/ 665'.;Shallow pulse test MWD @ 665'. 400 GPM, 695 PSI. MWD test successful.;RIH f/ 665't/ 4,913' @ —60 FPM.;Shallow pulse test MWD @ 4,913'. 403 GPM, 1027 PSI. MWD test successful. Prep to slip & cut drill Iine.;Transported to KGF G&I: Offloaded Solids = Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 209 bbls 10/8/2019 R/U head pin and hoses to circ hole @ 1 bpm w/100 psi @ 4935'.;Drawworks making noise like the chains are slapping. Inspect chains and couplings - all good. Inspected traction motors and found brushes worn on one motor. C/O brushes and run drawworks. No slapping noise, drawworks running smoothly. Loss rate @ 6-7 BPH.;Hang blocks, slip and cut drilling Iine.;R/D head pin and hose. RIH out of shoe to 5120'. Break circulation and down link with ATK Rotary Steerable stab @ 431 gpm w/980 psi. and set tool to maximum build. Shut down pumps and allow blade to close on tool. (losses while down linking = 17 bbl).; RIH to 9575' Filling pipe every 2500'.; Break circulation. Bring up rate slowly to 208 gpm and 500 psi.;RIH to 10,430'.;Wash and ream f/ 10,430' to bottom @10,615'. 80 RPM, 11.5K TQ, 391 GPM, 1500 PSI. 45 bbl losses while reaming.; Drill ahead dretnl, 8-3/8 hole 10,615 - 10685 ft. Losses 40 - 100 bph. with LCM sweeps 30 min intervals. WOB 25, RPM 60, SPP 1450, GPM 400, TQ 16K. Cuttings return normal quantity - quality. SRV 10584, INC 25.07, AZ 241.43, Hole Position @ 10584'= 84' Low / 86' Right.;Lose pulse MWD, attempt regain with various attempts. No success. Discuss with Hilcorp Anchorage. Decision to call TD at 10,685 ft. TD 8-3/8 HOLE SECTION 10685 FT, THIS DATE 10-8-2019, AT 2230 HRS.;Mix and pump liner pill, total 75 bbls, displace with 190 bbls OBM (1200 ft) spot on bottom.;Flow check, fluid column static, POH 5" DP to 9300 ft. standing back in mast Screw in all stands, float not holding. No swab, no excess drag.;Flow check, column static, pump wt pill, resume POH 5" DP to 6700 ft. No further "U" tubing at DP.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 ?�/ r Daily Metal from Magnets 0 lbs. Total 18.25 lbs.�� l - /0 � Daily Losses to hole. 540 bbls 10/9/2019 POOH, standing back 5" drill pipe t/ 6200' , UD 5" drill pipe t/5600'. (Cleaning OD & ID of pipe).;Suspend tripping temporarily. All hands sent to help vac up rain water on top deck and around shakers.;Continue POOH UD 5" drill pipe, HWDP and Jars (Cleaning OD & ID of pipe).; Flow check at BHA, Handle BHA #8, UD and inspect all components, download MWD, break bit #8 ( Grade 1 ,1 ,NO, A, IN, NO, TD). No damage, bearings tight, no axial movement, seals effective.;Clean rig floor, assist crane crew pump rain water to GPP.;Service rig.;R/D 5" handling equip, R/U 4" handling equip.;PJSM, flow check (No losses, column Static), commence P/U 3320 ft 4" DP in singles, POH standing back in mast for 6-1/8 drill out. 2500 ft P/U at 0600 hrs.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 52 bbls 10/10/2019 Finish picking up and standing back 3320' (35 std) of 4" drill pipe in derrick.;Clear rig floor and bottom of Beaver slide. While crane back loads boat.;Make up 7" casing inner string drilling BHA and stand back in derrick.;M/U pulling tool and pull wear ring. Had difficulty engaging slots, when pulled found a piece of stainless steel plate wedged in slot and folded over.;Install test plug and run in LDS. Change lower pipe rams from 5" to 7".;M/U 7" test assembly, R/U test equipment and test 7" rams and annular. 250 psi low / 3500 psi high for 5 min each. UPR door seal leaked on Ann high test. Tighten bonnet bolts and retested - Good. Small trickle of mud through upper annulus valve.;R/D test equip, remove test plug, return all valves to original positions.; Install wear bushing, run in LDS.;PJSM, R/U liner run tools and equip.;Flow check (Column Static), P/U reamer shoe with pup jt, M/U csg jt #1 (7, 29Ib, L-80, DWC).;Weatherford power hydraulic unit fail. Replace with backup unit.;Flow check (Column Static), resume RIH jts csg (7", 29Ib, L-80, DWC) to 2000 ft. Slow going, run speed 20-15 fpm as precaution to Iosses.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 52 bbls 10/11/2019 Continue to RIH w/ 7" Liner 29Ib L-80 DWC to 2600'. Slow going, run speed 20-15 fpm as precaution to losses and to minimize overflow.;Stab into pipe with Volant tool, circulate and condition mud.;Continue to RIH w/ 7" Liner (29Ib, L-80, DWC) f/ 2600' to 5001'. Slow going, run speed 20-15 fpm.;Circulate 2 X i 5C bottoms up. 180 gpm w/ 270 psi, 14-25% Flow, 155 PUW, 140 SOW w/ pump, 150 SOW w/o pump, 149 Rot, 26 rpm, 4-5K Tq. No losses observed while circulating.;Continue to RIH w/ 7" Liner (29Ib, L-80, DWC) f/ 5001' to 5860'. (Did not see any additional drag or weight when entering open hole @ 5010').;PJSM, R/D csg run equip (bales, CRT, power tongs, all 7" handing equip). R/U Baker work table, quick connect assy, false rotary, all related 4" inner string run tools. M/U XOs to Baker "Kickstand" assy, hang off on slide for quick access.;P/U pre -assembled Baker BHA #9, Bit #9 from mast. RIH same. Follow with 4" DP inner string to 3485 ft of 4" DP. Losses total 8 bbls while run inner string. Ramp down run speed to 12 fpm resulting in "0" losses from 1500 to Icurrent depth.; Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Dailv Losses to hole. 8 bbls 10112/2019 Continue to RIH with 4" DP inner string f/ 3485' to 5860' @ 10-12 fpm (Any faster and we start pushing fluids away).;Change out elevators from 4" to 5". P/U and M/U Lower and upper Quick Disconnect and HRD-E Liner Setting Sleeve to 4" inner string and 7" liner. R/D raised platform, c -plate, false bowl and slips.;M/U stand of 5" DP to top of HRD-E liner setting sleeve. Break circulation and take readings for base line. W/O pump PUW 275, SOW 220. W/ pump PUW 260, SOW 210, ROT 235, 20 rpm / 9-10 Tq., 30 rpm / 9-10 Tq, 40 rpm / 10-11 Tq , 178 gpm, 800 psi.;Continue to RIH w/ 7" liner and 4" inter string on 5" DP, to 9038'. Kelly up on every stand to eliminate overflow. Filling pipe , rotating and checking torque every row out of the derrick.;Wash and ream through coal seam @ 9038'. Ream full stand down and back up. 40 rpm, 19-24 Tq, 185 gpm, 1250 psi. Work once w/o rotation- Clean.;Continue to RIH w/ 7" liner and 4" inter string on 5" DP. Kelly up on every stand to eliminate overflow.; Packing off with torque and tight hole. Wash and ream remainder 7" liner on 5" DP (All Stands) to btm. Tag bit depth at 10685 ft. Note: P/U for flow check at 10595 ft with max gas 786 units. Approx 2 gpm flow reduced to "0" flow in 5 minutes.:Commence drill 6-1/8 pilot hole 10685 - 10709 ft. (7" csq shoe at 10649 ft.) WOB 4K, GPM 140, SPP 780, RPM 45, Motor RPM 70, Torque 25K, ROP 3 - 4 fph.;Transported to KGF G&I: Offloaded Solids = 0 ` Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. e� l i Dail Losses to hole. 265 bbi 10/13/2019 Commence drill 6-1/8 pilot hole 10,709'( 10717'. " csg shoe at 10,687') WOB 10K, GPM 138, SPP 943, RPM 35, Motor RPM 70, Torque 26K, ROP 5 fph.;Pump and spot LCM pill on back si er. Stop rotation and set 30K down on the reamer shoe and let 6-1/8" drill off. Break off the TD and drop the 1- 3/4" bronze ball. Make up TD and ease on the pump at 1 BPM @ 50 PSI.;Ball on seat after 432 stks. Increase the pressure to release the HRD-E and saw the ball seat extrude at 3550 PSI after setting another 10K down. Pick up to see if released -No. Worked up and down and tried several more times even setting 220K down and still not releasing.;Start Secondary Release process for the running tool. Worked 14K down to the tool and then let wraps out and worked the same amount to the right to tighten up any possible loose connections. Picked up to see if free - No. Work it several times with no Iuck.;Got more aggressive i and still could not release. Tried to let drill off for more rat hole to allow downward movement of the running tool w/o luck. Work pipe to see if the liner was free. (j Able to work free at 550K. New PUW-450K and SOW_280K. Continue working and trying to get off;the liner - no luck. Called the Baker Shop in Prudhoe and discussed situation. Tried torquing to the right 10K ft/lb's both in compression and tension to see if the torque fingers are engaged. Could tell no difference indicating they are still engaged and not released.; Called the Baker shop in Prudhoe again and they thought the same as us, get something moving and POOH with whatever. Discussed options with Hilcorp in town while rig worked pipe. Slacked off to 150K picked up and released from liner. New PUW 290K.;Pick up 60' and monitor well. Static.;POOH to 10,349'.;Drain Stack, pull Wear Bushing and hang off string on test plug. Change out lower pipe rams from 7" to 5".;M/U test jt. and R/U BOPE test equipment to test on both 4" and 5" pipe. Flood stack and manifold with water. Line up and shell test stack and choke manifold.;TQst BOPS as per Hilcorp and AOGCC standards and policies. All components tested to 250 psi low and 3500 psi high. Tests witnessed by AOGCC Inspector Mr. Adam Earl.;R/D test equip, remove test pump from rig floor, coil hoses, pull test plug, install wear bshg. Return all valving to working position.; Flow check, fluid column static, M/U top drv, attempt pump through drill string, no success, press to 3000 psi. Re -check surface valves and equip. Make second attempt, no success, drill string plugged. Bleed press, prep POH 5" DP.;PJSM, POH 5" DP, hookload 245K, no gain / loss. Wet string. Bit depth 7000 ft at 0600 hrs.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 141 bbls 10/14/2019 POOH 5" DP f/ 7000' bit depth to Baker 7" LSS and Upper Quick Connect tool @. Inspect and Lay Down same. Secondary release shear pins still intact.;Change over handling equipment from 5" to 4". Clear floor of Baker and Weatherford 7" casing tools.;Continue POOH with 4" DP f/ 5992' to mud motor and bit.;Break off X/O, float sub, ported sub, stb and pup jt from top of motor. All plugged off with clay, coal and sand. Attempt to milk motor, motor seized up. Break bit off bottom of motor. Pressure wash inside of motor out as far as wand will reach inside, full of clay, coal and sand.;Clean rig floor from wet trip and cleaning out BHA tools.;Make up Baker SLZXP packer, latching bullet seal assembly wl half mule shoe and LNR quick connect assembly on bottom of single of 5" DP and stand back in derrick.;Change handling equipment to 4" and make up Baker cement retainer on bottom of 4" DP. RIH same on 4" DP to 4720 ft.;Circ, confirm 4" DP clear. No gain / Iosses.;Resume RIH. Slow going, 50 fpm (On Verge of Flowback). P/U pre -assembled Baker SLZXP packer, latching bullet seal assembly from mast at stand # 59 and single. Flow check, RIH 5" DP to 9442 ft.;M/U cmt head and subs, XOs in prep for cmt job. UD to deck for quick access when ready for use.;Flow check, Resume RIH 5" DP to 9266 ft. Prep for circ.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 0 bbls 10115/2019 RIH to 10,352'.; Establish circulation 2 bpm 250 psi, 3 bpm 360 psi PUW - 240k SOW - 185k.;Space out. UD 2 pups and P/U 1 sng. of 5" DP. Slack off engage HRDE Liner top hanger quick connect as per baker rep work over pull to ensure good latch pulling 50k over, attempt t/ establish circulation rate packed off, over pull to attempt to move casing pulling up t/ 430k no movement, pressure up;and attempt t/ establish circulation max psi 3650 psi, discuss options with town decisionmade to release from hanger and attempt to establish injection rate pressure up t/ 5000 psi bled off 30 psi in 15 min, attempt to release from HRDE Drop 1.75" Ball pressure up t/ 3650 psi hpld f/ 2 min bleed.;down to 1000 psi f/ 6 min and sheared DOBS tool pulled free from HRDE, P/U 10Set Cement retainer as per Baker rep, [Top of ret at 10,426 The set liner top packer w/ 4k do wt. P/U and Circulate Bottoms up @ 4 BPM 2000 psi, R/D Cement equipment.;Mix Dry Job clean and clear rig floor, Pump Dry Job. Pull 4 stds. PU and break do cmt head.;POH standing back 5" DP to Liner hanger assem. Dogs were sheared and tool looked good. Clean and LD tool.;POH standing back 4" DP to CICR run tool.;UD 3BB-K1 Mech CICR setting tool. No damage, tool intact.;Flow check (Column Static) Clear and clean rig floor while wait on arrival wireline operators.;Arrival wireline operators, PJSM, R/U unit, P/U perf guns (3- 3/8 OD, 3 ft, 6 SPF, .75" Shot) Attempt RIH through A 5" DP. Will not drift 5" pin. Rearrange wireline through Jt DP, M/U wireline pkf.;Flow check, RIH perf guns on wireline to 8800 ft at 0600 hrs.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 0 bbls 10/16/2019 RIH with perf guns on a -line to top of ret at 10,426'. PU to tool wt and fire perf gun. Shot 3' gun w/ 6 SPF. Hole stayed static. POH with wireline.;Shut Blind rams and establish an injection rate at 4 BPM and 500 psi. Pumped away 20 BBLS.;PU and MU Tri oint nkr Mi 12 jts 2 7/8 tbg and 4' mule shoed pup below packer. Hole taking 16 BPH while making up tools.;RIH to TOL.. Go slow through liner top with stinger and packer. Didn't see any drag. Continue RIH with the rest of the 4" DP and swap elevators over to 5". Run one stand of 5".;RU to set packer and test csg.Set packer and test liner lap to 2800 psi for 30 min on a chart. Lost 20 Psi over 30 min. Bleed off and RD test equip. Unseat packer.; Continue RIH to just above Retainer with stinger.;Space out and set packer at 10,333' w/ bottom of stinger at 10,405'. RU cmt line. Hole PJSM w/ everyone involved.;With bypass closed circ do string to ensure we can inject. injecting at 2 BPM and 300 psi. PU Sand press bled off when the bypass opened, Schlumberger pump 2 bbls water then tested lines to 3000 psi.;Wait on Schlumbeger to get cmt batched up. Then we pumped 32 bbls spacer w/ the rig pumps. Swapped over to Schlumberger and they pumped 81 bbls cmt, rSlacked off and closed bypass at 75 bbls] followed by 2 bbls water. Swap back to rig pump 5 bbls spacer and swap to OBM.;Pump 54 bbls at 8 BPM before we caught pressure. Drop back to 4 BPM at 350 psi. Pressure continued to build and when we had the drill string cleared it had built up to 2550 psi. Shut in and monitor press and discuss options with town.;Build and hold pressure against cement with hesitation squeeze method. Continue hold pressure beginning at 2550 psi dropping to 1260 psi. Bleed to 1100 psi, hold stable.;Transported to KGF G& 1: Offloaded Solids = 0 Cumulative Solids = 1707 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 281 bbls 10/17/2019 Packer set at 10,333' and stinger is at 10,405'. Monitor pressure from cmt squeeze job. Press at 1260 psi. By 07:12 pressure had came do to 980 psi so we bled it do .5 bbls to 660 psi. Shut in and it built to 764 psi.;Bled pressure do slowly to 20 psi getting back 2 bbls. Monitor well and it still had slight flow that died down. PU to 225k to open bypass. Well static. Pull packer free with no increase in pull. PU 10' then let packer relax for 5 min. Slack of and packer moved down hole.;Continue PU and LD sng with cmt assem and one pup jt out together.;Put wiper ball in pipe and circ to clean pipe w/ tbg tail at 10,315'. Seen traces of spacer come back on bottoms up and some cmt contaminated mud from the inside of the pipe.;Monitor well and pump dry job. POH 9450'.;PU cmt assem. Break it all down and lay it dn.;POH checking connections for cmt rings. Started seeing cmt rings at 9240'. Break and clean cmt out of every connection on the 5" DP.;Change handling tools over to 4" and continue POH to RTTS. Trip drill resulting in 30 sec.response time.; Flow check, L/D RTTS and components. ;Clear and clean rig floor.;M/U BHA #10, Bit # 10 7" scraper assy, RIH same. BHA Wt 16K.;Flow check, follow BHA with 4" DP to 5" DP at 6789 fl, follow 4" DP with 5" DP to 10260 ft.;Begin wash - ream 10260 to cmt retainer at 10426 ft at 0600 hrs. Take no weight, no fill, wellbore clear.; Transported to KGF G&I: Offloaded Solids = 76 Cumulative Solids = 3413 Daily Metal from Magnets 0 lbs. Total 18.25 lbs. Daily Losses to hole. 0 bbls 10/18/2019 Circ hole clean w/ clean out assem in the hole. Got back traces of spacer and contaminated mud.;Pump dry job and POH to BHA.;LD Clean out BHA.;PU Whipstock BHA. MU window mill, lower mill, flex jt„ upper mill, XO, 1 jt HWDP, XO, MWD stop sub, On Trak MWD, stb, BCPM, stb, stop sub, filter sub, and XO. Orientate tool. MU whipstock with trip anchor. f Anchor 21 k, Mill bolt shear 48k].; Upload MWD tools.[ Took 45 min.] RIH w/ 6 stds of HWDP.;Test MWD and Continue RIH to tag liner top at 4788 ft.;Cannot pass 4788 ft. Circ possible debris while tag lightly. Tag multiple times 4 - 15K. No success. Communicate with Hilcorp Anchorage. Discuss POH, remove whipstock. Whipstock, and RIH window mill only, dress liner top bore for possible obstruction.; Flow check, PJSM, POH 4" DP for whipstock assy adjustment.; Handle whipstock BHA #11, stand back HWDP, L/D MWD, remove whipstock - anchor, M/U window mill, lower mill, upper mill assy. RIH same.;Tag liner top hgr, pass through with no pump - rotation. Take no weight, no obstruction. Begin passes with pump - rotation. Ensure hanger bore clean, free of possible restriction.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 3413 Daily Metal from Magnets .5 lbs. Total 18.75 lbs. Daily Losses to hole. 0 bbls 10/19/2019 Wash and ream through top of liner hanger past restriction w/ all 3 mills 4 times. 4 BPM 80 RPM. Didn't see and obstruction or torque.;Circ Bottoms up at 8 BPM, 1575 Psi. Got back about 1 Ib metal fines back on our 4 magnets.;Pump dry job and POH. Inspect and gage mills. Everything looks good.;PU whipstock and bolt into starting mill. Scribe to top ofjt of HW. PU MWD and orientate. Upload MWD.;RIH w/ HWDP. And test MWD. Continue RIH to liner top.;Didn't see anything at top of liner. See slight bobble at 4788' but went right through. Sat down 15k at 4866'. PU and sat back down at the same spot about 3 times and it fell through. Continue RIH slow watching for any tight spots.;Resume RIH 4866 - 9850 ft. Tight hole, P/U 10 ft until free, set do 10K, approx 5 ft tight hole, break free.;M/U top drv, wash do 9850 to 10285 ft, take no wt. Begin take wt at 10285, wash, re-cip, set 10 - 12K on fill each pass. 303 - 350 gpm, 2550 psi. Continue wash 10285 - 10388 ft. No further downward progress. Fill possible compaction by whipstock anchor. P/U 220- S/O 180K.;Continued attempts wash past 10388 ft, no success. C/C fluids while consult with Hilcorp Anchorage. Decision to set _whiostock. ,Set do 25K , no indication anchor set, Set 25K once more, no anchor set. Set 30K on anchor, still no indication set. Test pull 250K, pull free anchor not set.;Consult with Hilcorp Anchorage, Decision to POH for clean out assy.;PJSM, flow check (Static), POH 5" DP for clean out BHA. 3700 ft at 0600 hrs.; Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 3413 Daily Metal from Magnets .5 lbs. Total 18.75 lbs. Daily Losses to hole. 0 bbls 10/20/2019 POH to whipstock BHA.;LD MWD and PU to whipstock inspecting the mills. All the mills looked good. Unbolt whipstock and install lifter on whipstock. Pull whipstock out of hole. Anchor was packed off solid with cmt. Pictures are in the o -drive. LD whipstock.;MU clean out BHA. Bit, csg scraper, and upper mill. PU jars and bumper sub. RIH w/ HWDP.;Cut drilling line & service rig.;RIH w/ clean out assem to 10,338'. Did take slight increase in wt at 4782' & 4846'. Both were spots that we had taken wt before.;Break circ 248 GPM, 1435 Psi. Wash do from 10,338' to where we tagged at 10,386'. Clean out fill from 10.386' to top of the retainer at 10,426'. Circ for 5 min then PU 30' off bottom. Shut do pump and go back to bottom. Get good mark on bottom with no pump.;PU 30' and circ hole clean. Stop pumps, slack off to tag retainer with no pumps. No fill, take no wt.P/U 30 ft, cont circ shakers clean.;Pump wt pill, Flow check, POH to tight interval at 10274 - 10264 ft. (Pull 4 - 6K over), (Take 4K down). Re-cip, rotate free. Pass through no pump. Take no wt. No up drag.;Flow check, POH 5 stds wet 5" DP. Pump slug, resume POH to top liner hgr.;Wash - ream mill assy through liner hgr bore (4760 - 4790), ensure bore free of obstruction. Total 5 passes. Pump slug, break TD XO.;Flow check, resume POH 4" DP to 2200 ft at 0600 hrs.;Transported to KGF G&I: Offloaded Solids = 72 Cumulative Solids = 3485 Daily Metal from Magnets .0 lbs. Total 18.75 lbs. Daily Losses to hole. 0 bbls 10/21/2019 Continue POH w/ clean outrun to BHA.; Break off bit and scrapper and LD the rest of the BHA.; RU E-line. Start in the hole with the CIBP at 0900 hrs. Set at 10410' WLM, 10,419' DPM. POH and RD e-Iine.;Change out Hawkjaw. . The lower makeup ram wouldn't return back to the relaxed position after usage.;MU whipstock BHA, Install new 45k brass shear bolt in whipstock and new anchor set at 21k. Pug in and upload MWD.;RIH with HWDP and Surface test MWD. Good test. Continue RIH to 5900' w/ no issues.;Continue RIH to 9230 ft.; Displacement indicates possible plugged drill string. Pump through string, confirm clear.; Flow check, resume RIH to 10112 ft.;Wash 10112 to tag at10412 ft while orient MWD to 60 LOHS.;Tag CIBP at 10412 ft. Set DW with 20K, and shear anchor. P/U 25K over, confirm set. S/O and set 50K DAN. Mill shear from slide. P/U to 10385 ft with no over pull. Whipstock in place. TOW 10395, BOW 041 08 ft.:P/U 225K, S/0180, ROT 200, RPM 80, Free Tq 8K, GPM 320, PSI 3200 Commence mill 7" csg window 10395 to 10405 ft at 0600 hrs.;Transported to KGF G&I: Offloaded Solids = 0 Cumulative Solids = 3485 L o� Daily Metal from Magnets 94 lbs. Total 113 lbs. Daily Losses to hole. 0 bbls 10/22/2019 Mill window f/ 10,405't/ 10,408'. Milling formation f/ 10,408' t/ 10,409'. The formation we are drilling in is sandstone and the starter mill won't drill the formation. Decision made to POH and put a bit on instead of the starting mill.;Pump dry job and POH to BHA.;LD MWD, starter mill, and lower string mill. MU new lower string mill and Kymera bit. RIH w/ HWDP.;Continue RIH w/ 6.125" Kymera bit & mills T/10,271', M/U TD, broke circulation, established parameters. P/U-212K S/0-175K ROT-195K RPM-60 Free TQ-7.5K GPM-350 SPP-1540 psi.;Washed down T/10,400' and set down 4K, P/U & racked back one std., P/U single & std., M/U TD, re-established parameters. P/U-220K S/0-180K ROT-200K RPM-80 TQ-7-81K GPM-277 SPP-1813 psi, washed & reamed down T/10,409% cont. to drill 20' of new formation T/1 0,427%; Reamed through window side area multiple times w/ upper & lower mills, shut down pumps, went through window multiple times w/ no issues.; Pulled into the window, R/U test chart, preformed FIT test w/ 9.0 ppg mud, 1916 psi for EMW of 13 ppg (ok), R/D testing equip., CBU at current time. 10/23/2019 Pump dry job. Extra pipe that was in the derrick started to come untied and fall out of the fingers due to the high winds. Secure pipe in drk.;POH w/ whipstock mill assem to BHA.;LD bit and mills. Bit had some outer teeth broken and it was 1/8 out of gage. Upper mill was worn do on the bottom section but the upper section was in gage. Clear floor.;Operate BOP equip and flush stack, Flush out choke and kill line. Clean floor.;PU and MU 6 1/8 directional drilling BHA. Everything was broke out so it took longer to make everything up. Ran a Reed PDC on a motor w/ 1.80 bend.;Plug in and upload MWD data, cont. M/U 6-1/8" directional BHA #16 F/102'-T/172', loaded radio active sources, cont. RIH w/ BHA #16 P/U HWDP F/102'-T/818', tested & warmed tools on first stand of 4" DP (ok). Started conditioning OBM mud in reserve pit #1 over shaker while tripping.;Cont. RIH w/ BHA #16 on 4" DP F/818'-T/4725', eased through top of 7" liner w/ no issues at 4763', cont. RIH w/ BHA #16 on 4" DP F/4763'-T/6935', held well control drill crew during trip, 67 sec total (good), got correct calculated pipe displacement during trip.;Started P/U & M/U singles of the deck & RIH F/6935'-T/7124'.; Held PTSM, crew change, cont. P/U & M/U singles of the deck & RIH F/7124'-T/9,266', M/U XO & started RIH out of the derrick w/ 5" DP, cont. to get calculated pipe displacement.;Cont. RIH w/ 5" DP F/9,266'-T/10,359', M/U TD, calibrated MWD tool, orientate tool face, exit window w/ no issues, washed to bottom and started directionally drilling ahead F/10,427' to current depth of 10,446'. P/U-21 OK S/0-165K ROT-180K GPM-283 SPP-2851 psi.;Transported to KGF G&I: Offloaded Solids = 56 bbls Cumulative Solids = 3541 bbls Daily Metal from Magnets 60 lbs. Total 340 lbs. / G� C9 Daily Losses to hole. 0 bbls 10/24/2019 w/ 1.80° bend mudmotor f/ 10,446' U10,606'. 275 GPM, 3050 Psi, 8 to 12k WOB, MW 9 ppg, ECD 10ppg.;Picked up to make a connection and it packed off and hung up. Attempt to work free. Finally broke it free in rotation. Reamed back to bottom the backreamed the entire stand. After we had it freed up we made a connection.;Surveyed at 10,553', Inc 40.34, Az 236.02. w/ a 12° dogleg. Rotate 1 sng do to 10,635'. Slide f/ 10,635' t/ 10,668' and Take check shot survey at 10,616', 46.32 Inc, 233.72 Az, w/ a 9.83° dogleg. Rotate last sng on the std do U 10,704'.; Directional drill 6 1/8" hole sliding & rotating w/ 1.80° bend mudmotor f/ 10,704' t/ 10,745'. Had to rotate 15' to make room to work the pipe and orientate. At 15:35 hrs we stalled the motor and it it went to 3800 psi. at that point we started loosing mud and it increased to 50 BPH.; Looks like losses may have started at 10,737'.;PU off bottom and monitor well. Mud falling slowly in hole. Circ slow and stay up above loss zone while we pump mud do at 10 PPB LCM. lost about 22 bbls while circ at 125 GPM.;POH on elevators to 10,495' where we started having over pulls up to 50k. Backream f/ 10.492't/ 10,467'. Pull on elevators to 10,458' and we had to start backreaming again. Ended up backreaming to 10,416'. Then pulled last 8' up into the window.; Put well on trip tank and monitored while bringing LCM content up to 20 PPB in circ pit, had zero losses, orientated tool face above window top, shut down pump, eased through window w/ no issues T/10,412', brought on pump to 150 GPM, monitored hole for half an hour while cont. to;bring hole volume mud up to 20 ppb back ground LCM, monitored hole while circ., (static).; Started washing & reaming to bottom F/10,412', seen slight seepage losses @ 10,512', cont. washing & reaming F/10,512'-T/10,735' w/ no hole issues, staged up pump, orientated tool face, washed to bottom F/10,735'-T/10,745'. P/U-220K S/0-170K ROT-190K SSP-2630 psi GPM-270.;Cont. directionally drilling ahead, had moderate losses while drilling, of 20 bbls per/hr., drilled F/10,745'-T/10,756' while cont. to loss mud, made decision to pull off bottom, slowed down pump rate, mixed & spotted a 20 bbl LCM pill on bottom w/ 40 ppb of Baracarb.;POOH on elevators F/10,756'-T/10,326', had no issues POOH. Total losses during the TIH, drilling, and TOOH =82 bbls. 20 bbl an/hr. average. Total losses for the day 197 bbls.;Lined up trip tank to circ. across the hole, monitor hole while letting pill soak, hole is taking 3 bbls per/hr. at current time, mixing second 20 bbl LCM w/ 40 ppb of barafiber while cont. to let first pill soak.; Transported to KGF G&I: Offloaded Solids = 72 bbls Cumulative Solids = 3613 bbls Daily Metal from Magnets 3.5 lbs. Total 343.75 lbs. Daily Losses to hole. 197 bbls 5t1 10/25/2019 Monitor well on trip tank while setting up in the pipe. Hole taking about 5 BPH. Mixing 40 PPB barafiber pill.;RIH to 10,714' where it started taking wt. Wash and ream to bottom at 10,756 and space out where we could drill 60' without making a connection.; Rotary drill from 10,756't/ 10,816'. Pumped 20 bbl barafiber pill when we started drilling. Hole was taking 60 BPH until pill went out the bit then it fell back to 28 BPH. Pumping 250 GPM, 2650 psi, 40 RPM, 8 to 10k TQ, 14k WOB.;Pump 2nd 20 bbl, 40 PPB barafiber pill. Stopping when pill was in pipe and taking a survey. [Depth 10,754', Inc 43.70, Az 225.77] Finish spotting pill in open hole. Shut do and monitor well.;POH up into window with no issues.;Monitor well on trip tank. Hole was static.;RIH to 10,792' with no issues.;Orientate tool and slide drill f/ 10,816't/ 10,892', 260 GPM, 2850 Psi, 6 to 12k WOB, Av loss to hole is 18 BPH. Ream full stand.;Take survey [10,835', Inc 46.24, Az 222.95] Get tool orientated and start slide. Pump 20 bbl 40 PPB barafiber pill. Slide Drill f/ 10,892', U 11,040'.;Cont. slide drilling F/11,040 - T11 1 started stacking weight, lost all diff, pulled off bottom to back ream std., kicked in rotary, had tight spot F/11,044 -T/11,000% cont. to ream spot, while reaming up hung pipe @ 11,033', began working to free stuck pipe. P/U-220K S/0-175K.;attempted to free pipe w/ trapped TQ while beating down to 100K multiple times before cocking jar and jarring up to 150K over P/U weight, w/ no success called town, decision was made to built LVT lube pill to spot on back side in open hole to help free pipe.; Pumped 38 bbls of LVT lube pill, chased w/ 8.8 ppg OBM to spot LVT lube pill on back side, shut down pump, left 10 bbls of lube pill in pipe to spot as needed.;Cont. attempting to free pipe w/ trapped TQ while beating down F/250K-T1100K-70K multiple times, went to spot a couple of our bbis of LVT lube on the back side and pressured up, tried to establish circ. multiple times w/ no success, called town and discussed options, lined up ` Pollard wireline;to come out and make a free point back off while cont. to free stuck pipe.; Transported to KGF G&I: Offloaded Solids = 18 bbls Cumulative Solids = 3631 bbls aily Metal from Magnets 2.5 lbs. Total 346.25 lbs. Daily Losses to hole. 298 bbls 10/26/2019 Pie is stuck in the hole w/ the bit at 11,033'. Attempt to free pipe by applying torque and setting do max wt. Also jarring up at 370k and parking pipe with strain on it while waiting on E -line. E -line hands arrived at about 10:30 hrs and fishing hands at 11:00 hrs. Broke off upper sng and LD same.;Orientate hands to the Spartan. Had meeting with E -line hands, Fishermen, and drilling manager about forward plan. Decision was made to back off string at the bottom of the XO below the jars. Blow do TD and that caused a 35 bbl spill to the deck on the GP due to TT overflow. Clean CBM off GP deck.;RU Alaska E -Line. Prep string shot. Attempt to pull plug out of the top of the goose neck on the TD swivel. Couldn't get plug out. Decided to RU on jt of 5" DP. Work torque into pipe, Put 5 rd left hand torque in pipe. work pipe from 150 to 225, Put 3 more left hand turns. Work torque dn.;Put one more wrap in and work torque in. Have a total of 8 wraps in to the left that = 9k on the gage. Set slips and lock torque in with the rotary. Break out TD and RU E -line sheaves.;RIH with a string shot on E -line. Run collar log and set string shot at bottom of XO under jars. Fire string shot. Didn't see any indication of shot going off on the rig floor. POH.;Break off packoff and pull string shot out of pipe. Shot had fired. Remove valve and XO. Lower and RD sheaves. MU TD and pull pipe off slips. Work pipe do to 150k and PU and never pulled over 220k. pipe was free.;Circ. STS to even out mud weight, shut down pump, flow checked (static), pumped 20 bbl slug 1 Ib. over mud weight.;POOH F/10,404 to surface, P/U-205K S/0 -170K, backed off at the bottom of the XO between the jars & HWDP, recovered everything but 629' of BHA #16, broke off XO's on jars & UD jars.;Drained stack, P/U test plug, latched into wear ring, backed out lock downs, pulled wear ring, set test plug on 5" test jt., M/U dart valve, TIW, side ported sub to test jt., filled stack w/ water, purged out air, started shell test.;AOGCC Rep Brian Bixby will be here at 07:00 hrs. to witness BOP test.;Transported to KGF G&I: Offloaded Solids = 90 bbls Cumulative Solids = 3721 bbls Daily Metal from Magnets 0 lbs. Total 346.25 lbs. Daily Losses to hole. 30 bbls 10/27/2019 RU to test BOPs. Put shell test on the BOPs w/ 5" DP.;Test BOPs with AOGCC inspector Brian Bixby witnessing tests. Test all BOP equip to 250 and 3500 psi. Test gas alarms, PVTs, and accumulator.;RD test equip. Set wear ring.;Do a rig and derrick & rig inspection because of the excessive jarring that has occurred over the last couple days.;Prep to PU BHA, PU screw in fishing BHA. Screw in sub, bumper sub, fishing oil jars, 6 - 4 3/4 DCs, Accelerator jar, & XO 2 .96.;Started RIH out the derrick w/ 4" DP F/223' to TOL (7") at 4,763', went through liner w/ no issues , started to centrifuge our MW back at surface to -- ppg.;Cont. RIH w/ fishing BHA F/4763' -T/10,381' just above window top, P/U-215K S/0-175K.;Lined up pump and displaced hole volume mud from 9.4 v g to 9.0 ppg, GPM -430 SPP -3000 psi, shut down pump after we had 9.0 ppg around.;P/U single, washed down and tagged top of fish @ 10,405', P/U and ked in rotary, washed back down on fish, pressure came up to 750 psi, shut down pump, run TQ up to 10K and trapped TQ, reciprocated pipe to work TQ �. own to screw in sub, P/U to 250K and S/0 to 150K,;repeating this multiple times bringing trapped TQ up to 13K, P/U-215K S/O-175K GPM -154 SPP -470 psi.;Started iarrino on fish. S/O to 150K -100K to cock jars, P/U to 260K -340K, firing jars and pulling up to 370K and holding it, also trapping 10K TQ and \�- pressuring up drill string to 1000 psi while cont. to jar on fish, currently cont. to attempt to jar fish free.;Transported to KGF G&I: Offloaded Solids = 0 bbls Cumulative Solids = 3721 bbls Daily Metal from Magnets 0 lbs. Total 346.25 lbs. Daily Losses to hole. 0 bbls 10/28/2019 Attempt to free pipe by jarring up to 370k. Also tried applying torque and spudding pipe down.;Space out for running string shot. LD sng and PU 20' of pups.;Lost pipe drift while drifting pup jts. Knew drift wasn't left in pups but still couldn't find it. Pulled mouse hose and turned it over but no drift. Decided that it must have went down the rotary pin hole and into the flow box.;Put left hand torque in pipe 3 rds at a time, then work the pipe. Had 9 rds in and decided to put one more rd in and pipe backed out of screw in sub. Brought on rig pump and watched down hole for returns. Hand noticed drift was floating in hole. Had hand go under rotary and grab drift.;Went back to circ and rotated do on the fish. Started to pressure up so we shut pump do and torqued into fish. Worked pipe and applied more torque to 15k. Bled off pressure and released right hand torque. Then worked the pipe to get the torque out.;Then we started putting left hand torque back in 3 rds at a time and working pipe. Got a total of 9 rds worked and locked in. Set pipe in slips with 160k, with the table locked and released the torque from the TD.;RU a -line to run string shot. Get shot made up and Ready to RIH.;RIH with E -line. Tagged up at 10,560' WLM. This would put it at the connection between the 5th and 6th jt of HWDP. Attempted to get by this spot several times w/ no success. POH w/ a -line. Had a little bit of fine coal on tool. RD a -line so we can check torque on pipe.;MU TD to pipe. With TD brake locked, PU on the pipe and check to make sure left hand torque was still on the pipe, and it was. PU 40k over up wt to make sure we were not backed of. Set back in slips with 160k on them.; Break out TD and RU all the a -line equip again.;Tools showed up on the chopper. MU 1 7/16" swedge, knuckle jt, spangs, and wt bars. RIH to 10,560' and tool got stuck. Work tool jarring up for 15min and it finally came free. POH and break do tool. Had just a little bit of fine coal stuck in the end.;MU string shot and RIH. Set tool across the bottom of the 4th jt of HWDP and the top of the 5th at 10,527'. Fired shot and had good indication on the rig floor.;POOH w/ E -line, verified shot fired, R/D E -line, put 3 wrap to the left in the string, trapping 5K TQ, worked string down to 150K & up to 250K multiple times w/ no indication of being free, cont. to put 2 wraps to the left in the pipe each time for a total of 13 wraps, each time checking;the trapped TQ left in the string & losing half the TQ, pressured DP to 400 psi looking for any pressure loss while working pipe, no luck, made decision to let all the left hand TQ out and apply 7 wraps to the right in the pipe, trapping 10K TQ, worked pipe, checked wraps left in pipe and only;got back half a wrap, decided to put 9 wraps in to the left, trapping 6K TQ, worked pipe, put 5 more wraps to the left, trapping 8K TQ, worked TQ down, brought up pressure on DP to 400 psi, pulled up to 350K, weight started to fall off and pressure started to decrease, cont. to pick up, brought on;pump on a 50 -GPM, established circ., pulled std. high, washed back down, weight dropped down to 220K, shut down pump, broke off pups, screwed back in, brought on and staged up pumps to GPM -370 SPP -2460 psi P/U-210K S/0 -160K, pipe was free w/ extra weight on the hook.;Pumped 25 bbl barafiber LCM pill and circ. STS to clean up hole, pumped 20 bbl slug 1.5 lbs over MW, flow checked well (ok).;POOH F/10,527' to surface, UD accelerator jar & fishing oil jar, racking back DC, recoved 4 jts of HWDP, got calculated hole displacement during TOOH.;Currently M/U cement clean assembly w/ mill tooth bit and racking back in derrick; Transported to KGF G&I: Offloaded Solids = 162 bbls Cumulative Solids = 3883 bbls V Daily Metal from Magnets 0 lbs. Total 346.25 lbs. 1 1� Daily Losses to hole. 0 bbls f� Id✓h 10/29/2019 Lay out and strap 2 7/8 tbg stinger. PU 15 jt 2 7/8 tbg with a short mule shoe jt on bottom.;Service rig. Grease TD, Blocks, Crown, and drwks. Change handling equip to 4".;RIH. Went through top of 7" liner with no issues. Went through window with no issues. Tagged fill at 10,515'. Washed do to 10,527' where we tagged the top of the fish.;Circ bottoms up, Got back some fines over the shakers, but not a Iot.;MU cmt head with foam ball on top of closed TIW valve. Hold PJSM. Pump 2 bbls of water with Schlumberger. Shut down and put foam ball in line. Pump 1 more bbl of water and test lines to 2500 psi. good test. Batch up and pump 10.1 bbls of cmt, followed by 2 bbls of water.;Shut in Schlumberger and open TIW valve w/ foam ball on top. Pump 115 bbls OBM at 4.5 BPM slowing do to 3 bpm for last 5 bbls. Shut do pump and break off cmt head.;Pull 5 stds slow to pull tbg stinger out of the cmt. Cement in place at 16:30 hrs.;Put another foam ball in the pipe and circ until clean.;Pump dry job, POOH & UD 2-7/8" cmt stinger, vacuuming footballs through each jt., cont, working on pit cleaning, had calculated hole fill during trip.;Held PTSM, crew change, cleaned & cleared rig floor, P/U BHA #18, 6-1/8" cmt clean out assembly, RIH F/192' to TOL @ 4763' went through liner top wl no issues, cont. RIH and had 8K set down @ 4784', P/U checked depth per DP tally (spot on), attempted to go through again and;set down same spot, P/U & came down and set 3K on it, turned it one wrap and it fell right through.;Cont. RIH filling on the fly every 3500' F/4784' to 10,049' tagged cmt stringer, screwed in and started washing down, current depth of 10,093', got calculated pipe displacement during TIH.;Transported to KGF G&I: Offloaded Solids = 36 bbls Cumulative Solids = 3919 bbls cti Daily Metal from Magnets 0 lbs. Total 346.25 lbs. DailV Losses to hole. 0 bbls 10/30/2019 Wash cmt stringers f/ 10,093' t/10, 273' where it started holding light wt. Clean out to 10,337' and it started holding 3 to 5k bit wt. Firm cmt.:Drill cmt f/ 10,337' t/ 10, 408'. Bottom of window.;PU to top of window. Circ hole clean getting back cmt.;Get SPRs, Monitor well, Pump dry job.; POH to 10,000'. Secured well for a fire drill at 10:00 hrs. Good response on drill. Continue POH. Broke bit, bit sub and float sub out and stood back 4 3/4 DCs.;PU directional drilling BHA. Adjust motor to 1.80°, MU bit and orientate to MWD. PU NM flex collar.;Plug into tool and upload. Had to change some software because tool was set up for a rotary steerable.;Cont. P/U remainder of BHA #19, NM flex collars, jar, and 4" HWDP while cont. to clean mud pits.;Slip & cut 134' of drill line, preformed rig serviced , finished cleaning pits 1-3, and started building new batch of MOBM mud.;RIH w/ 3 stds. of 4" DP, XO, RIH w/ 2 stds. of DC for push pipe, XO & cont RIH w/ 4" DP T/1,832'.;Held PTSM, crew change, cont. RIH F/1832' -T/3,092', filled pipe & shallow tested MWD tools (ok).;Cont. RIH F/3,092' to TOL @ 4763', went through liner w/ no issues, cont. RIH F/4763' -T/10,307', fill pipe every 3500', had calculated pipe displacement during trip.;Kelley up & washed down F/10,307' -T/10,396', orientated tools face at the TOW, eased down through window wl no issues, started time slide drilling, current depth 10,413'. P/U-215K S/0 -170K GPM -247 SPP -2138 psi.;Transported to KGF G&I: Offloaded Solids = 108 bbls Cumulative Solids = 4027 bbls Daily Metal from Magnets 0 lbs. Total 346.25 lbs. Daily Losses to hole. 0 bbls 10/31/2019 Time drilling 6 1/8" hole at 17 hr w/ mudmotor f/ 10,413' U10, 419'. 260 GPM, 2200 Psi, 1 to 2k WOB.;Time drilling 6 1/8" hole at 1'/hr w/ a mud motor f/ 10,419't/ 10,422'. 260 GPM, 2160 psi. 1.5 to 2.5k WOB. Getting 20% sand. Still building vol in pit 1.;Time drilling 6 1/8" hole at 2'/hr w/ a mud motor f/ 10,422't/ 10,427'. 260 GPM, 2160 psi. 2 to 3k WOB. Getting 25% sand and hard cmt. Building vol in pit 1. Running centrifuge and maintaining mud wt at 9 ppg.;Looks like it wants to pull back to the old hole. Work pipe to get it back to 110° to the left and get away from the old hole. Go back to 1'/hr and time drill f/ 10,426't/10,432', formation percent dropped from 25%-10%. 261 GPM, 2140 Psi P/U-215K S/0-170K.;Called town, decision was made to orientate tool face to 150° left, reduced GPM to 220 and attempt to hold 5K WOB, drilled F/10,432'-10,436' w/ no WOB, P/U & worked pipe, re -orientated tool face to 150" to the left, applied 2K WOB.;kept pumps at 220 -GPM and went back to time drill at 1'/hr. F/10,436' -T/10,437', cutting sample showed formation percent dropped to 5% and cmt was soft & mushy coming back.;Cont. time drilling at 1'/hr., while holding tools face at 145°-150° left, cont. to attempt to get departure from old well bore. GPM -220 SPP -1732 psi, F/10,437' -T/10, 439', w/ no success, P/U off bottom and started troughing to help w/ departure, called town, decision was made to slide drill.;T/10,448' and resume time drilling at 17hr, while holding tools face at 145°-150° left, right above a 10' coal at 10,455', attempting to get kicked off in coal seam. current depth 10, 448'.; Transported to KGF G&I: Offloaded Solids = 0 bbls Cumulative Solids = 4027 bbls Daily Metal from Magnets 4.5 lbs. Total 350.75 lbs. Daily Losses to hole. 0 bbls 11/1/2019 Drill do sliding down f/ 10,448't/ 10,453'. Looking for top of 5' coal to assist in kick off. Pump packed off w/ a 250 Psi increase. Shut pump down and pipe was hung up. 750 Psi was trapped on DP. Bleed pressure off and cock jars. PU to 350k and pipe jarred free. Work pipe and get toolface back;150° left. Slide back down but pipe packed off at 10,444' again. Shut do pump and bled press. Pipe pull free w/ a 10k overpull. Work pipe and get toolface back to 150° left. Slide back down to 10,450'. Getting 20% cmt w/ trace of sand, but mostly LCM mud products. Seen an increase in gas f/ 3 t/5 U.;Time drilling 6 1/8" hole at 1 FPH f/ 10,450' U 10,453'. Started showing traces of formation with very little cmt and mostly mud products. Holding 150° to the left to get away from the old well, started bring mud system up to 5 ppb w/ soltex & baratrol.;Cont. time drilling 6 1/8" hole at 1.5FPH f/ 10,453' U 10,460', cuttings sample started showing 40% formation with cmt & mud products. Holding 150° to the left to get away from the old well. P/U-215K S/0-172K GPM-239 SPP-1980.;Cont. time drilling 6 1/8" hole, staged up ROP F/4-T/12 FPH f/ 10,460't/ 10,461', started seeing an increase in weight & diff, WOB-4.9 Diff 20 psi, at 10,462' weight & diff fell off and tool face went to 80° left, P/U and worked pipe, re-orientated tool face, eased back to bottom,;cont. time drilling 6-1/8" hole at 3 FPH, F/10,461'-T/10,466', seen increase in diff (80 psi), but very little weight (.9k), cuttings sample from 10,462 showed 90% cmt/ mud product & 10 formation, call town, decision was made to slide drill ahead and see if we could get it to stack more WOB.;Cont. time drilling 6-1/8" hole at 6 FPH, F/10,466'-T/10,468', WOB-1.6K Diff-35 psi, cutting sample came back w/ 60-70% formation/mud product & 30% cmt, cont. time drilling 6-1/8" hole ahead at 10 FPH, F/10,468'-T/10,469', WOB-5.1 K Diff-61 psi, while cont. to hold tool face at 150° left,;cutting sample came back again w/ 60-70% formation/mud product & 30% cmt, Cont. time drilling 6-1/8" hole ahead at 12 FPH, F/10,469'-T/10,471', WOB-5.2K Diff-57 psi, started to see weight drill off while holding some diff pressure and tool face holding at 150° left.; P/U & had to work it a little while to get our tool face orientated to 150° left, called town, decision was made to start to trough. PIU-215K S/0-172K GPM-241 SPP-1950 psi.;began to trough F/10,415'-T/10,470' for 2 hrs , while cont. to catch sample marks from 10,468' & 10,470', both showing 80% formation/mud products & 20% cmt.;Cont. time drilling 6-1/8" hole at 2 FPH, F/10,470'-T/10,471', WOB-0 Diff-0 psi, while holding tool face at 150°-170° left, cutting sample F/10,471' still showing 80% formation/mud products & 20% cmt, plan forward is the bring ROP up by 1' every/hr.;Cont. time drilling 6-1/8" hole at 3 FPH, F/10,471'- T/10,473', WOB-1.5K Diff-34 psi, while holding tool face at 150°-170° left, cutting sample F/10,472' started showing 90% formation/mud products & 10% cmt.;Cont. time drilling 6-1/8" hole at 4 FPH, F/10,473'-T/10,476', WOB-2.5K Diff-36-46 psi, while holding tool face at 140°-150° left, cutting sample F/10,475' still showing 90% formation wl less mud product & 10% cmt, formation cutting are looking like shavings from PDC bit.;Cont. time drilling 6-1/8" hole at 5 FPH, F110,476'-T/10,481', WOB-3.1 K Diff-58 psi, while holding tool face at 90°-110° left, cutting sample F/10,479' still showing 90% formation/mud products & 10% cmt.;Cont. time drilling 6-1/8" hole at 6 FPH, F/10,481'-T/10,488', WOB-3.5K Diff-38-62 psi, while holding tool face at 80°-90° left, brought ROP to 7 FPH @ 06:00 hrs.;Transported to KGF G&I: Offloaded Solids = 72 bbls Cumulative Solids = 4099 bbis Daily Metal from Magnets 4.5 lbs. Total 355.3 lbs. Daily Losses to hole. 0 bbis 11/2/2019 Cont. time drilling 6-1/8" hole at 6 FPH, F/10,488', t/ 10538' WOB-3.5K Diff-38-180 psi, while working tool face up t/ 30-45 left, brought ROP to 12-28' working off TF and diff and up gpm t/ 260 gpm.;Wash ooh t/ 10490' (ok) ream slide @ 60 rpm w/ 6k TQ back to btm X 2 (ok).; Resume slide drilling @ 30-45 left f/ 10,538' t/ Kelly do @ 10,587' WOB 6-8k Diff 100-170 psi, @ 260 gpm @ 2250 psi.;Wash ooh t/ 10,488' (ok) ream slide @ 60 rpm w/ 6k TQ back to btm @ 10,587'X 2 (ok) Make connection survey still hot w/ 25.98 degs.;Resume slide drilling @ 30-45 left working off TF and diff. f/ 10,587' t/ Kelly do @ 10,682' WOB 6-8k Diff 100-170 psi, @ 260 gpm @ 2250 psi started taking losses @ 10,571' +- 60 bph slowed U 220 gpm and continued drilling ahead to Kelley do w/ total 38 bbis lost and hold ing.;straight pull off btm t/ 10,672' ok and back reamed t/ 10,585' (ok) Ream @ 60 rpm w/ 6k TQ back to btm @ 10,682'X 2 (ok) Make connection and staged up U 230 gpm and got a good survey @ 10,632'w/ INC @ 35.07 and AZ @ 221.35 w/ no Iosses.;Orientate and resume slide drilling F/10,682' w/ 230 gpm SPP-2040 psi, WOB 5-7K, @ 10,695', started seeing seepage losses, pumped a 10 bbl 8.9 ppg LCM pill, at 80 lbs per/bbl around while drilling ahead, losses healed up.;cont. slide drilling ahead F/10,695', w/ 224 gpm SPP-2140 psi, WOB 5-7K, @ 10,727', started seeing seepage losses, pumped a 10 bbl 8.9 ppg LCM pill, at 80 lbs per/bbl around while drilling ahead, seepage losses slowed down.;Cont. drilling ahead w/ minimal losses F/10,727% w/ 224 gpm SPP-2172 psi, WOB 7-8K Diff 299, @ 10,745', lost all returns, slowed pump rate to 50-GPM, P/U to 10,697', pumped 20 bbl 8.9 ppg LUM pill, at du ibs per own pipe at 100-GPM, while filling back side from TT, got well stood up;w/ 10% return flow once pill rounded the corner, shut down pumps, POOH F/10,697'-T/10,397' w/ no issues, monitored hole for 1 hr. while circ. across hole w/ TT, zero losses.;RIH below window @ 10,418', staged pumps up to 230-GPM w/ no losses while circ., cont. RIH F/10,426'-T/10,479', took 10K weight, P/U, brought on pumps (220-GPM), orientated tool face and washed right through, cont. RIH F/10,479'-T/10,679', Kelley up, staged up pumps to 220-GPM,;washed down and tagged up @ 10,743'.;Attempted to drill ahead, lost all return, P/U & slowed pumps T/10,685' (70-GPM), lined up and pumped 20 bbl 8.9 ppg LCM pill, at 80 lbs per/bbl down pipe at 100-GPM, while filling back side from TT, got well stood up w/ 10% return flow once pill rounded the corner, shut down pumps, POOH;F/10,685'-T/10,388' w/ no issues, monitored hole, while circ. across hole w/ TT, zero Iosses.;Cont. monitoring well on TT while building mud volume. Total losses for the day 273 bbls. Distance to plan: 6.92 6.75 Low 1.51 Right.; Transported to KGF G&I: Offloaded Solids = 0 bbis Cumulative Solids = 4099 bbls Daily Metal from Magnets .5 lbs. Total 355.8 lbs. Daily Losses to hole. 273 bbls 11/3/2019 Cont. monitoring well on trip tank wl bit above window @ 10,388' while building mud volume. w/ .5 bbl loss in 8 hrs.;Cont. monitoring well on trip tank w/ bit above window @ 10,388' while building mud volume. Worked pipe once and moved 10 bbis in drill string w/ 1 bbl loss in 12 hrs.;Cont. monitoring well on trip tank w/ bit above window @ 10,388', finished first 298 bbl batch of MOBM w/ 40 ppb of back ground LCM. working on mixing 70 bbl LCM pill w/ 80 ppb of LCM for spotting in case of total losses. Losses while circ. over top of hole over the last 18 hrs=1 bbl.;Cont. working on mixing 70 bbl LCM pill w/ 80 ppb of LCM in slug pit#1. Worked on camera in the derrick, changed out shaker screen from API 200's to API 80's to reduce the amount on LCM being strip out of our mud while drilling.;P/U std. RIH T/10,420' just outside BOW, pumped 10 bbls through MWD tools to ensure LCM material wasn't settling out and plugging tools, finished mixing 70 bbl LCM pill w/ 80 ppb of LCM, started working on 2nd 298 bbl batch of MOBM w/ 40 ppb of back ground LCM, losses over;the last 21 hrs. =1.3 bbls.;Cont. to work on 2nd 298 bbl batch of MOBM w/ 40 ppb of back ground LCM, losses over the last 24 hrs.=1.8 bbls.;Transported to KGF G&I: Offloaded Solids = 54 bbls Cumulative Solids = 4153 bbls Daily Metal from Magnets 0 lbs. Total 355.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right Daily Losses to hole. 1.8 bbis total = 304.8 bbis from this event 11/4/2019 Cont. to work on and finish 2nd 298 bbl batch of MOBM w/ 40 ppb of back ground LCM, losses over the last 30hrs.=2.2 bbis. Take on diesel from platform, house cleaning and rig maintenance.; Take hole off trip tank and line up on Pit #3 short system. Rih two std f/ 10,387'- t/ 10,577' (OK) work full std and circ @ 107 gpm @ 640 psi and add LCM product to bring back ground of hole mud t/ 40 ppb LCM stage up t/ 220 gpm Loss rate stable.;Rih f/ 10, 584' and taking weight 25- 30k X3 @ 10,595' (coal ) wash ream t/ 10,620', do pump and rotation. Rih taking weight 20-25k wash ream @ 10,652' Rih t/ 10,717'. Safety wash and ream @ 40 rpm @ 6-7k @ 1320 psi @ 174 gpm.; Rotary drill f/ 10,745' t/ 10,750' w/ 140 bbls of loses and zero to 13% returns, orientate and slide drill @ 30 L t/ 10,756' @ 1680 psi @ 200 gpm while spotting 20 bbl 80 PPB LCM pill w/ additional 268 bbls Iost.;Pooh back through window and into csg U 10,367' @ monitor well on trip tank w/ no losses for 2 hrs.;RIH T/10,432', oriented tool face 90° left, GPM -205, SPP -1730 psi, shut down pump, RIH w/ no issues T/10,722', tagged LCM fill, Kelley up, washed down T/10,754', GPM -100, SPP -670 psi, proceeded to pump & clean up open hole, lost returns, slowed pump rate 50 GPM, tried to re-establish;circ., w/ no success, shut down pump, back side was full, lost 17 bbls while pumping, POOH on trip tank, had a 30K over pull @ 10,752', worked though on elevators, pulled back in the window @ 10,385',; monitor hole on TT, while finishing up mixing slug 2.5 ppb over MW, lost 1.5 bbl over 2 hr., pumped slug, slug ineffective, built 2nd slug and pumped, pipe came dry.;POOH F/10,385' -T/4749' TOL, flow check @ TOL (ok), cont. POOH F/4749' to BHA #19, racking back BHA in derrick at current time., while working on 3rd 298 bbl batch of MOBM w/ 40 ppb back ground LCM, hole fill during trip was 10 bbls over calculated.; Transported to KGF G&I: Offloaded Solids = 0 bbls Cumulative Solids = 4153 bbls Daily Metal from Magnets 0 lbs. Total 355.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right Daily Losses to hole. 429.5 bbis total = 734.3 bbls from this event 11/5/2019 Continue working bha, Continue working on 3rd 298 bbl batch of MOBM w/ 40 ppb back ground LCM.;Monitor hole clean floor Load door w/ cmt stinger static loss rate @ zero.;P/up 14 jts 2-7/8" tbg stinger @ 441.46' total w/ defuser and btm 6' has 40 -3/8" hole @ +- 60 deg phased.;Rih w/ 2-7/8" cmt defuser on dp out of derrick broke circ twice to window taking weight @ 10.690'.;wash cmt stinger to btm f/ 10,690' U 10, 756' and stage rate t/ 220 gpm 1140 psi pick up and drift w/ no pump ok w/ 12 bbl loss while washing rack back stand.;Space out r/up cmt head and lines load foam balls PJSM & pressure test lines 300/3000 psi (ok ).;Pump 25 bbis 13.55 ppg Class G Cement @ 4 bpm, chase wl 5 bbis H2O, Drop top ball, Displace with 113 bbls 9.1 ppg OBM, ICP 526 psi @ 5 bpm FCP 800 psi @ 4 bpm.;UD Cement head and Pull and stand back 10 stands of DP f/ 10752't/ 9769'.;Line up and squeeze cement staging pumps t/ 1.3 bpm 500 psi max psi 12.2 bbis squeezed injection started @ 415 psi, shut down pressure bled down to 440 psi and held, bleed off pressure CIP 2010 hrs.;Line up and Circulate surface to surface 7 bpm 1450 psi no cement on bottoms up, pump slug.;POOH on Elevators f/ 9769' U 441'.;Change out floor equipment, UD 2 7/8" cement stinger.;Clean and clear rig floor, P/U and crane BHA components to floor.;M/U BHA as per DD/MWD.; Transported to KGF G&I: Offloaded Solids = 0 bbis Cumulative Solids = 4153 bbls Daily Metal from Magnets 0 lbs. Total 355.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right Daily Losses to hole. 57 bbls total = 791.3 bbls from this event 11/6/2019 Continue M/U BHA # 14 as per DD/MWD and shallow hole test (ok);P/up rabbit strap 4" HWDP;Rih w/ drilling Bha # 14 fill pipe twice to 10, 388' right above window;orient to face 60 left and exit window and slide chasing old hole 50-350 fph wl no hard cmt encountered t/ 10,743' and started losing returns flow do 8% and total losses @ 10,745';slow pump t/ 115 gpm and 730 psi hole staying full w/ very little to no flow and pump 20 bbl 80PPB LCM pill and spot around corner do pump w/ 105 bbis Iost;Pooh on elevators through window and into csg @ 10,362';monitor well on trip tank while waiting on orders f/ town, Build and pump slug;POOH on elevators f/ 10,362't/ 1633' UD all HWDP;UD Remaining BHA, Download MWD, UD smart tools break bit UD Motor, UD drill collars from derrick;Transported to KGF G&I: Offloaded Solids = 0 bbis Cumulative Solids = 4153 bbls Daily Metal from Magnets 0 lbs. Total 355.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right ! 1 Daily Losses to hole. 133 bbls total = 924.3 bbls from this event 11/7/2019 Continue UD bha #14, drill collars from derrick and r/dn Baker B.P.A. and equipment.;P/up M/up Halliburton 7" cmt retainer and running tool & rih w/ same t/ 10,270' w/ no issue.;Attempt to brk circ to 800 psi do pipe with no luck chk surface equipment (ok) work pipe up do ok, r/up and attempt reverse circ and stage pressure up to 1000 psi w/ very little to no injection discuss options with town.;Establish injection rate 2 bpm 1300 psi reverse circulating no returns up DP, swap over and pump down DP stage pumps t/ 3500 psi in 500 psi increments unable to establish circulation, discuss options w/ town, set retainer as per Halliburton and shear off retainer w/ 55k over pull, establish circ.;down drill pipe, stage pumps t/ 6 bpm 1500 psi, attempt to sting into retainer and establish CX injection rate, packed off set 20k down, pull out of retainer, stinger plugged pressure up on stinger to 1500 psi plug cleared, sting back into retainer stage pumps U 2000 psi and pressure started falling;off, establish injection rate 1 bpm 1280 psi 2 bpm 1380 psi 3 bpm 1450 psi , pullout of retainer, R/U cement head and lines, sting in and reconfirm injection rate.;PJSM on cement job, SLB pumped 2 bbis water shut in valves and PT lines to 300/3000 psi, pumped 111 bbls 350 .4'v sx 13.5ppg Class G cement, followed by 5 bbls H2O stung into retainer and squeezed all but 5 bbis cement into formation, unstung and laid remaining 5 bbls on top of retainer, Pumped 1337 stks;UD cement head and lines and racked back 3 stands t/ 9960' retainer set @ 10327'.; Drop ball and circulate around at p `,high rate 8 bpm 2000 psi, cement contamination on bottoms up, strip LMC and weighting material f/ mud.;Transported to KGF G&I: Offloaded Solids = 18 bbls l Cumulative Solids = 4171 bbls Daily Metal from Magnets 0 lbs. Total 355.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right Daily Losses to hole. 140 bbls total = 1064.3 bbls from this event 11/8/2019 Continue circ 9961'@ 251 gpm @ 1315 psi and strip LCM and weighting material f/ complete mud system w/ no losses, finish clean solids from pill pits run water and OBM lines in prep for transfer to and from GPP;Continue circ and centrifuging and striping LCM from OBM start filling pill pits w/ FIW and flushing lines w/ same and start build spacer.;Shut pipe rams Test csgon chart t/ 2849 psi > 2757 psi in 30 min bump up twice and bled air once (ok) rig/dn test equipment.;Pump 662 bbls to beam tanks on GPP, R/U to reverse circ and pump 520 bbls FIW @ 3 bpm FCP 890 psi , shut down.;Clean flow lines and fluid paths and trip tanks and sand traps clean pits, clean under rig floor and catch pan, ship remaining 1124 bbls of 8.7+ ppg OBM t/ GPP beam tank.; Transported to KGF G&I: Offloaded Solids = 144 bbls �L Cumulative Solids = 4315 bbls Daily Metal from Magnets 2 lbs. Total 357.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right Daily Losses to hole. 140 bbis total = 1064.3 bbls from this event it 11/9/2019 Continue clean flow lines and fluid paths and trip tanks and sand traps clean pits, clean under rig floor and catch pan, shiped total to date of 1124 bbls of 8.7+ ppg OBM t/ GPP beam tank.;Continue clean flow lines and fluid paths and trip tanks and sand traps clean pits, clean under rig floor and catch pan, Have isolated pit #1 of interface and rig clean up plan to build batch obm once done w/ completion diesel clean up.;POOH UD 24 its. of 5" DP leaving 44 stands in derrick, Stand back 40 stands of 4" DP, fill slug pit w/ FIW f/ platform, Work Boat off load Eline unit and tools.;Continue POOH f/ 4370' UD 4" DP @ 2908'.; Transported to KGF G&I: Offloaded Solids = 0 bbls Cumulative Solids = 4315 bbls Daily Metal from Magnets 2 lbs. Total 357.8 lbs. Distance to plan: 6.92 6.75 Low 1.51 Right Daily Losses to hole. bbls total = 1064.3 bbls from this event 11/10/2019 Continue cleaning shakers tanks and continued POOH Id/dn 4" DP f/ 2908' t/ Bha;lnspect clean and I/dn Halliburton running tool (ok) P/up 4-3/4" jar clean same and lay back dn. Pull wear ring prep to run 2-7/8" kill string;P/up rih w/2-7/8" mule shoe cut it @ 22.18' and 13 full its of 2-7/8" IBT 6.4# L-80 tbg w/ special clearance couplings and land hanger w/ TWC installed Wl mule shoe @ 491.78' rkb RILDS;Back out remove XO rack back landing stand. Clean flow box and prep for nip/dn remove stack and trolley over remove riser and set dry hole tree;Hammer up dry hole tree, Test seals and void t/ 500/5000 psi f/ 15 min, Test tree t/ 250/5000 psi f/ 5 min, Pull TWC, prep to skid rig;N/U riser and BOP stack, install bell nipple and flow line, center stack;Final Report for GP- 55rd Rig Activity now on GP-53rd;Transported to KGF G&I: Offloaded Solids = 0 bbls Cumulative Solids = 0 bbis Daily Metal from Magnets 0 lbs. Total 0 lbs. Total of 1124 bbls of 8.7+ OBM pump back to GPP beam tank m ai 0 m a Q a 7 c 'o a C7 0 o H oa O� o O v_ vvuryi NDN IMi;,vl p M 0° o 0 O��p<NOOi M M' v'<ro o N "' rnrn � vmrn r rn NM�m Crn hNv rn 6 Nmm 6 m 000 m comvvvvnMco m rn mV<V m m nvumvi mm'mM `" - m m u°v'i mem m m m h vnomv m m `� m m000v m m m m m m h �v m m rn �I� 0000 C� m m� FNM 0 m N N mmm vmm O m O N ry .-O O o N vi m m o m mmm m N M Rvh Mmo MmmNmommmava r aii� m min n M V Om M M m.-nom v n 0� mNNNNNNcO'� mO NO N 0 ro of r n N � Nv0N.0--0 � p 0 0 ro. m m � NN o N 0 vm r m m c0] O«Om MIM o Om r r m m m v m M dry+] M M Orf m m vvvoi r .. m m N m M p MMMNV M M O r Oih rn�n r. m m m Ci ul1hm O M M iom r r m V h mMm�NOM m O�W O O O V Or V 0 m6 Obi V h OfmmO� ONMNVNOM�^cp'i O��Om�pOmmM�NOOn00 ry N N Wm V mc:j� O�v�maP 0 0 0 0,6� .-NvNM n n m O M< �mmNO O 000 _ o Z �rnrniornmmmmmmmmmmmmmmmmmmmmmmm NCO v vmm.-�n �Im N co ommvmr vJN V I�Di .-NmMmNu:l rni m'r N M OWN N _ MMM O G Z Z m VV��R N'NN MrnvNmrnmN co N N MVOimmOmMmNMmmOf v � v'uri N N mN mo mrm ... ov mm N N N�`N t�h N N�� � �m M O 0 _ Z lz�z M O co co N N M c �<orn N M �nmm N� NnOi vmmn N N NMNt rmnm 00N �ONi ov V t M 0 0 NNNNNNNNNNNNN _ _ 0 0 N m o<oo i�m<o N N n o Nvm nnn M M n moo N O O 0� MmNamO <NNmm M M 0 0 _ _ Z iiI�ZZZZZ ^ 0 0 �o m c� � N N m M M m.-m Ni rrnrrrmmmmmmmmmmmmrnrnm Nh«V gl r r rii M Opi Oi Nm� M M 0 0 _ _ n n^ 0 0 N V 2uo'in ��4VV<V<VVV<C mrvp mm<ommmmm<o N NIN rn N mON OimONc'i m pro iomm N M �fmO�hrOO�N I� O N<p n M M 0 0 N m Z r 0 0 M ��N'^� N N v M N sf mNm� NMr«r �o MN�OVhNNmN<Nm<aro a��fm0 NCO OvmMmm to m M M 0 0 N N r n 0 0 m m uumi 2 N'N N N N Mvmrmm rnmmm.-n mm N N t00 aOmnmMnve m N Oni aD m. M M 0 0 m vl n r 0 0 m v"i voiv� N N n N N � io N N r N N N Oi Me�n m m miom N N n v V rtr0 M M . 0 0 NN h�N ZZZZ r r 0 0 m N �oN�M�mNu`�i iom N N mmmmm n N N m.. "rn N N O�<nNmO afV�000i V mmnmmo m m nom N N O�OMOiNmM00 v � Opi'N M(r0 - M C 0 0 NNNNNNN r r 0 0 O O a v rmN io NIN OmiN N N Nmmvmvmrn m m N N N NOf m m N N McN vmi c� _� V V C 0 Z r r 0 0 O N o m V �'iCV vi mco N N <� N N m cm p QiOrN<0 O�O�[l m m rnvvvv N N m . N rn m�[l�Nm V tr0 V V 0 O:O ZZZZZ_ Z �to2Nl___ r r 0 0 O 0 o N NiN ' co co N N o N N mrn ou'niv omm rn rn Mmm N N N N . . m o V nm O V V V O O N Z 0 0 0 0 ri r mvm NN ip mm N N N VIII co mm �cO N mmm m�v V h R m rn mll N NIN O[�O N -O Vio N 00�� c; Q c:; N N ���i�lNO ��� N 0 NNN 0 0 ���i NN 0 0 (NO tNO 0000•-•--•-� N 0 0 fNO NOmiOOmmr�aOOmmnM�OOrm inMnMvv N NIN 0 OHO O N O m O NN O O m O. O O N m �««NNNNNNCI O C6 m W �"�00000mmrn�io m r m V m M N N M .- m NN�"� N N m �Wo �o V N N 0 0 WV h V V 0 0 N r m m�O sf NNhm GSC V <N 0 � vi"m�rnnmmm N O m N � m N N AOhmNm�mm m n m V mArrm N m N m r m m M 0 m N A O A M mm�n 0 0 ` o0 0 0 0 m 0 0 0 0 m m 0 0o 0 0 0 0 0 0 0 0 0 0 C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O 0 0 0 >>ci NC m m > Y Y > �� m -- 0000000000100000000 mm mm mmmmm m mm ci 00000 mm .1..� 0000000000000oa 0 0 0 o c o 0 o c o 0 0 0o 0 0 olo 00 0 o po 0 0 00000 00 0 0 /L, W v mm� n Y Y m A m 1. �OOOmO W OIO«N W ONS W O OWiO.N-NN�� vi.... n n r n n r r r n r n n o�E`- `-wzN _ O}I NN m my -.ml m0 0 0mNO m V OOOMa mM mm OO mr mO mM mm msf Wm Oc' Wm N� O�VNN� •y/ ci�OO 0 0 O OO hNO mtN q, rm v0 Z Z Z �v ^O 66 66 O O O O G O OO C G O O O O O �R O O �2 0 < O 0 0 0 p p d � oo m �lM�OOm m N v Flo m m N NAMnVpO p m o m pm�W�n[)NNN tO mCJ �fWp��<mVV��n��tm0 V N V p aad- Nuri �mN O��cW'lhhMN�NmMmo7 mN V M«Oren') W r nNMN�jMrNrNm CM r� — �� nvvmmMmvmmMmNr Mlry VNNV'N N co, v m m « m N m m ma olo OoC000 om 00000 CCOC. 00 vrn - - � O vvm - - - - - _ mumi _ . �m :a �n,i�m- mNmo`V _ "v'i�o'v o�v>:r' - _ - _ _ - - -_ _ m� io Nin v" o' n`Womm Q �mco� mco NIS co N comm `O M rr nnr of of m of M mp co mmc�mmmmmwmmmm- u`�i uMi aWimmmmmmmN _ _ _ _ _ _ LINL' u2 t2 t2 �n �-i i v�n_�n v Z in nnn�r�nrrrnrrrrnrrrrrrr0r z z N iA Z z iA iA z z iN. z Z N N z z N N z Z N N�p z Z z Z tW0 z Z . r z Z n n Z Z n1r Z Z r m pr Z Z Wp [O nnArnnrnnr Z Z NNN Z Z < z z O M Z Z M M Z Z N N Z Z Z z 0 n Z Z 0 o rmmmmmmm Z Z OWi T z Z ONi m Z Z z m m n N NIN nNNNnNNNNnNNN N N NNN NIN NNNNNNN WNNNNNNINWNNmmmmmmm N NN NINNNN uninuniN uni vri un>unity Hurl vni N�(nin unity vni NeMnoN �rNn un�i rnm Nm Nm a r ��OpVi mOb<i �VmV �W �mmco O MObVi WOpi mOp<i NOWVi AON<i nV� mmmmO NmO<i (6,61. 666 Ohmm mmmGMmNO mmmm mm mm �V � R<mV ObVi Op«i «<V OWV�i OWVi V ONmVi V a<V OWVi OW<Vi V «V 11<.O <n,r V <V V d' V V V V' Vm V RR V V � � U N N N N N N N N N N NIN N N N N N N N N N N mR N N N N mR'? N N N N NDN NmNNmNN�N�hin N N N N N N N N N N N N N N N N N �I� ml m�moM mMm NOMm mr�mo ov m vNm N MM M MMm MMm rcMm] �MMm mMm m�m NN Mm(mN noMmN rNMm OmMN Mr�ovvvM sMmMof z W 0 N ("N MMM "N t"N mN MmN lNMm MmN N N Mm� N N M"NNCM"J N�9mvCM"N'J MmNn MmN moMMMmMm N N N N NNN N U^ « oW Q N o 117979999993 N O o N r N f V 0 u7 O N N a^D N (mi r m f O M 0 WO M N m W O> S O N nm N M y Qw 000 0 0 0 0 0 V mmNmNN�'-.- 0 0 0 •- M m N� <� Mvmm«<Nm rO.stm� O J O � d � y� � « w Z « c OC OGOO G'G COOOOOGm 000 �NNNM My V N r vi t4 t4� 6 LL « m m 'o 'Za E u U a w o o m m o CL �Q , in¢ pa 2 a N� S nm��vr'C 0 0 0 0 0 voiCvoi 0 0 o 0 0 cmn�mou'Nwc�oiv 0 0 NIN 0 o m rn m r rn ofmmo rn m" voiv rn rn ai rn rn rpi umimo� m w oiv my a iv a;4pn m m� 'm 0 m (a7 0 0 0� �� _ m �i0 oNrCj l�Nr NONONONONNrn rnmmrnrnmrn� m.=�6 my ��o 1. «to�ro�m m mm«Vm m mm�<o rnrnm�mmmW m .-to V .-<o�o�m�m mmmam- mwm� mmvMM W W m �o V NW fWOO m m Ni N NNN M M< Vv I G O � N >U� y y (NO tN0 tN0 (D �N�NNN m m Nno r rnmmv�n M M m N V mm `gym V O V W o N <p pn V N N MOO mNn m Om. N O to oop m� r M = mm O �Ipr� a0 oo 0 0 0000 vmm 000 M�lm«rm . . �(O NMV . . ONi o . . c:i . . �momN CO .0 O V R V N V 0 tO ONimm m 0 0 vMMrvN 0 0 NN'rrt�m 0 0 V Ma fp ONio <i0� u'co 010 n" O O 00000 n CN]cW'l O O co m �o-- N D a N N N N N N m m m m m m� ry nom mrmv�n nm v �n �m m v o � ��.o� civ giro numi co N n m m C m Cn nC� mm•- ml�m V N m mmOC mC n cmi `�nvvvv vuoi 2 --mi m m ---nom O N N I� Oi � C ro of � ci m Oi!� C m ai N Ci mmmmmnnrr m m m m'rn m m m Noo ��� � N o,r r m v 40- m o m rn Mm mM m m y McNi rNi c>c�`"�`�o oo'n o n nm oM uni,m��cvNpN rn Pi .1 o°r'r'm �Cv roN1 ON I i77Iry O O O O N O O N O O 2 r "72 l r ip O C Q G Q 0 0 0 Q O O O N ci com m �•v omor v�ro �roorononvvi m�� .-mmmmmmmmornq�m<q �Q� I m m n N n 0 N_ C m O m N m n C MCm NC•-On� r V _ _ _ _ _ rvmom�nw v �t00Cm ONi NtmO���O VI�MrN NnNN `i NJ V'atC �roror OHO ANN o O C 0 0 0 0 0 0 0 NNNN N ZZZ zZZzzzZZzzzzzzzzzZZZZ MNNNA 2 2 2 V'O ONi N C 4,i v C 0 0 0 0 0 0 0 0 0 0 0 0 000000000. Ih m�mmm n vmrmN N•vno N,m mmmv o rN P INON m�m . Mi . .. b N 1� N O Cci�OroN Cn.-mrYi Ni�OmMmNN n n NN N N N ���- �-000000 00000 mm mmmm m mmmmmmm m,mm mmmmm N N.N N N NN N N N N N N N N N N N N N N N N mmm mmmmmmrNvmm o m n Nanoo.-mr m IR Un o civroroi�vn.=n vvi m N C iO m O N N n m m o N m r o NNN NNNN NNN N�N N m m M o m m m m roNmNv�U m.-NSY 1�0 ry c -vv N N N N N N N N N N N N CmNm.-NOOmm nMNm ON<`iroromv V I�ro NOriro Mvmmnnmmm mmM Nv> v�-aNMOvm o�v o Nmm°.°n�omm �mvm N �No 17 m m n m m V M M Nn m N Mvumimrm m mmr n r r r r r r r m w m mvo nmmmo� Nommen ovum ovmm Nmvv ro cV r N � 6m m � � Oi ro N N n mmm mmmm�cmmmv N N N N N NNNN N N N N N NNN N ci Ci M�+i NiM Hi Strom �vm N N N M `n°mnwMvoi mOm�nC mmm rom�mm�M1O �J 1A� 4 .ro N,�NvrN mr o vi000rn°i� ron2 �p mmC4 No �NM,v mnnmmm Nnvmmr m mm mmm mmmmrnmmmmmmmrnm00000 OIOONOO OO O O��NN�mvJ m<Or V.O-rN r(O�NM N��CV'1 tMN N N t] C N <��m[pOOMt00 (000 cm'l N W O� V.N-�00 mV M�OrOM�mp�N'n m00 000000 '.v.-ggrNm mi N � N�gmm<q��oNY�.�" mem _ 010 000[pOV��M < Omi �OVVNN�.NV OmO�OVVO�N �N�m��mm O O O O G G G O O Q O O 0 .96 OOOOQ 600 Orn n n�4 m rir N mNommmmmmmmr�n .nmmmmom000vmvm 1w. mINommovmmm v c? v v 0 ...............�........... 00000io 00000 57777771 hzz h�l�z z z _ _ _ _ _ O O O m io io m co �o co co io co co m m m vmmXE; v2Nr r o a v -rrnr NvmmoNam rn m rn u' m m m m `O�m m vvvvvvvvvvvvvavv vvvvvv<vvvvvavavav v v�v vvvvvvvvavvv�v N N N N N N N N N N N N N N I O M m O c 7 N O m m N O m < M N N N 1. v N Om N SIM M m mmmmmmmmmmm N N N N N N NIN N N N N L 00000 O O O O O 000 O O O O cA CN O O O a °' < N Y Y m � rn�ggr'o."'n�m6�2 00 00000 z2E`r' O .N fn N _ O OIOONOO OO O O��NN�mvJ m<Or V.O-rN r(O�NM N��CV'1 tMN N N t] C N <��m[pOOMt00 (000 cm'l N W O� V.N-�00 mV M�OrOM�mp�N'n m00 000000 '.v.-ggrNm mi N � N�gmm<q��oNY�.�" mem _ 010 000[pOV��M < Omi �OVVNN�.NV OmO�OVVO�N �N�m��mm O O O O G G G O O Q O O 0 .96 OOOOQ 600 Orn n n�4 m rir N mNommmmmmmmr�n .nmmmmom000vmvm 1w. mINommovmmm v c? v v 0 ...............�........... 00000io 00000 57777771 hzz h�l�z z z _ _ _ _ _ O O O m io io m co �o co co io co co m m m vmmXE; v2Nr r o a v -rrnr NvmmoNam rn m rn u' m m m m `O�m m vvvvvvvvvvvvvavv vvvvvv<vvvvvavavav v v�v vvvvvvvvavvv�v N N N N N N N N N N N N N N I O M m O c 7 N O m m N O m < M N N N 1. v N Om N SIM M m mmmmmmmmmmm N N N N N N NIN N N N N L 00000 O O O O O 000 O O O O O O O O O O O E a z z EcN¢ � rn�ggr'o."'n�m6�2 00 00000 o000000m m2 o < fn N _ v o cLL �'yo 0000 00000000000rn OU Or<trO ONio��ONN NIN C'�MmM�O �i ci ci q��n �iW �q�rrrrr<q O O O mmrmm�nvNN�000mrnm rnrnmrnmrnrnmrnrnmmmmm °'m °'oi�mo mO1�O1p m o nn m r r r m a i a 0 o � F O h m 00o NNM m m� O oivm m V M � N N O � m m M«a<<h N N P N cM V va,rmM O i n C' u'i N V u 1 M•- cp I� m mrnm m m m N V N m u) V m V Oi O mm rn i M N O � cV ocq O�mm oa o `O F Y m V N m m cV M W oivvvv V V N N rnmmmrnrnrnmma m m tM cM mov V M N n m MMM mmm M M V mrn M V V E d M M V V V vo o <O <N V'�p'OMi co cv�n m en mien o riven W�N O!O o m N N OO N o O ONnmmmm 0����-��N N ryaNAm�000m O O p O V O O O M N mrnr M n 0 O . Q O O N �v o v O N 0 N G G m N u] N OM NN M M O O vimr m' r O!N CNl M Omi 4 V N p 0 m V NMc�'l M M �D V m V V tl M M mmm G V Y nrnnnr m tM•l tml M MIM %l N uj V u7 mm r v N NNM c0'l V M mmol! N C m O mm m m MNMm a V M M N O rrn m m m N m W vMJNN M M M 00 0 0 O WN m m N W no ovmMncl- N N Z Z 0 0 O� «N e V NNNNN m "'v" V V ���p00<O a vn N N mor m �mnmrno� m m v S� m r•- N N Z Z 0 0 V m oom V V mmm mm N N r m rn I? m m N N Z Z 0 0 W n m ai ,6 M NNNNNNNN aND0 �i N N roi ,�..�. r N W N N °'moarnn M N N Z Z u] N 0 0 m t00 N m viler r N N vvvvovvvaavaav NNNNNNmmu) n' M �� rn m io co NIN �iNr v o vin n O M O porn M M Z Z u) 0O N h cp mtp N � u'� r m tp N N o monno rnnvoi NNNN W mmmmm moron rnNvcomomvoinmmMmnmrno<nmMnov.n N uu' onMOamp co nnnrr N N ............ OR W V of N O Z Z u) _____________ t0mmmmmmmmmtOmm m v �O iD N N N N o N N mmm mmm m V Z Z u) VMO O n tMp N o��o N Na'novr'�on N N v en N NmV��19`2 m O N Z Z N Nvon v mm N m N V � ovmMmm Z Z mmmr ml e�M °-'mn�n X 0 m mmmmmm �+i�moie .NMv�n m V m M O r 0 rnvi Z Z 0 0 r 0 0 V � m� 0 � < _ Z Z 0 0 m W V� co anoi,�2 mom 0 0 mm �i Y'Mo, _ ion c0'l V< N Z Z 0 0 O�a70f o m V a N vvv 0 nm mhNmNmhl0 N <o rooi .nmrnm c>v �o�v�ovmnvm V N N Z Z N« r r 0 0 Na700 M M V N N NNN N N oio o'Nmo V V N N Z 777777 0 P, 0 0 N mm m N N M a nvio V ren u) - aD rnmM V V N N N V C O n r^ O vi m N N vvvvv NNNN V v V N m 888 o. N O - - V V Y N N N N �_ m V V M O O r r O O O Omi cJ n m� N N t00 Ip.f00 NIN mOmiV r v m V N N cor rn m m m N�N!N O,N N mi�o�mrr N. O W V�Cm O O O i p m O cl N OiNN� amDM �r�NNOnMNNOm O m m W N f O NNn"�nmNmm�m m N N N N M V vv N r N NNNNN O f N N M mOOmOmM cmp N rnrr m mnr a 7 N N M ip t�0 o r N Zo M V m m rn mM I N n O 2 <tN0 o N M rnm1mrn Nm�N m m.N m rmcV'1mVVM n V 0 Mu>� Ni C ... O p N m n mrr.VVV -V -�rn-rn� V ren m r N cu N V C N m m �-N mW 00000000 c M V m N nN OmOi N m m OC< Nn n V V 0 0 0 m a 0 m a 0 a a C, F M N n Mo IO t�NtOi��VV<V<<� � V V N N m m W �n n�nMMM WNW a R N N r mM N N a N N A mb �' W m N� m V .� WNWVO O> N 1Drnrumi "o V m M o VOVVN m N m ld cmovN V'N m W m m W 6OOi a O .-ON M m A W V m muni IV CVM CO W V' V O10 co �OrmWmO�NaO> V V O O Ion MMM OIO M N rnooNmr r')VVV�O'hV a O F- M W O r O O O> n W �NcmV _ SD a` N m mo Im N N m m M v 6Ip N m v v W rnrno OMi tM O:O m r rn Oi 0 NNfmOM a`i O O oo �N m W n h IOM 00 MI? M COV t� V 2 M O v m Oi 0 0�� NNry<NOri `n 0�� Nm0 �2m O O m r t� V V V io m'mn m N Oi N� V'gh�u)NvONpNM N O N uNi OOi N M n r W `O M (MOOOm M p vviW NmO00mi n N r W N� N 0 00000004-.i h N rm MIM ma!t0 0 0 N m Of O �<NO N VO mm N a m <Oni V'<�NNu)N m O O tmO ml� W �� O Ij m mmmmaow N W N N Mvvu"i W NON�Q M N 6 m m of MN��NI�O�� MW O m f p <D m m m V r u�'i <ul N t D 1 p-- fN0 m m NOi Iornm u1 M V O m Oi< V �1� N I q'o mn o vio qui �mmrn�mmrnrnmmWmm'Y�mW��4u>M m uio ui vuiomorN --i mvO1 a ma -P'T W m N W �olon�mo W6o�m ImT m m�N w7 m Ci Wim. 4N6 '? �nngo o0 vNmm O_INO<� O M O N Z Z _ O'O �uri��tni MM1p....... m 0 m N rm 16 6 V V m mmm N NNN v Wr vi ro N Cvvm N N O m W m m mmrnm mN r ammOi<NmN N rn ci MMtN�JM2 NN Z Z _ F. 0- 06 N �i v v m m "^'^''^^ WOVc0m��0100 4 V V< oiov�m r <[p O m m O N N m r N ON<I�OiN m r .Wm- r N O� m N N o o M M Mmm Mr NNN Z Z _ _ 0 h m r� m r — 6 M m m " N o ri O> GI W O m MiM N N W W N W �OmnINOOr mm 16161616 M N m .- N NNNN m W O O W 22.....0 Z Z w a 0 0 - - m N n n 6M'i-6.6 tM m m N N M V v ui N O m O M N N m M W W V C W M nmm�irNrn V o v N N m m M W W W NoMam'" O m 2 MAA NNNOONO Z Z iO O 0 0 W m r m N m m N N O� m r OmiN V m W m M`Ornnr m N r N I�O��thOiCNCI M N W N IrMr0 rrhsfm�mr[1m<mrmIrn OmO1mN� v m rrm�N In cN'i N m In r m � 0001 m m G N mONi Z Z u. W m 0 0 iD m m m W NNNN m m N N m o1oMrnNaMo V'IO N0 N n O O1 M m m m � � W N m n mmr M1 N M W m m 0 _ = mM-M .N MMMT Z Z m m 0 0 <O... --- �iW i4 m m N vi mON 0 0 N N O m CR R m �-- O O> . W v tlWr� r rn o rn o M N W m m m - G N N ^^NNNN Z Z N N 0 0 N M�NaOMO W� m m h W r <6 N O N m R m r v 0rmN1v�0mmO.m-NO.m-�mMNm w 17 t i m o m W W nm O� O� N 0 0 Z Z W m 0 0 MOOMO c0'l m N N V m m M 0 r W M m NNN m N r m N M o 0 fl0 m M C l m m m r m�tl Of 01 66--m O V 0 0 Z Z r V 0 0 n N v M N N O m m v 10 M S N W IUN m m r v mMm�nN<mmoImmO v M 22M V m t i M v o 0 O> W 01 O> mM 0 0 NNN Z Z •- m 0 0 r - r 10 uoi v m m mr r of W N 0 m V m m r G � O mmuni N N W h W V V W m I.V W M 0 0 _ _ Z Z m V 0 0 r N ro 0 v v .............. m n nmmN�TrOMO •-R N<O m m v N Wgmwmm W ..... m N o m O M ��nNp�N�01h O> 01 p V V 0 0 NNN _ _ Z Z N V 0 0 - N <p M v v ��r mm co o I n h N . r m tO Oi m m N m 6nW-VWW W N m r .m P m C m M p O f N T m I p - rMmm r .. 0 0 NNN N_ m Z Z W V 0 0 N - M N n N M <om r ao M M M N u) O Oi Ol�vi00<O m m o —OW�NOomO.�mmar�rnD m M mP M m M O 6 O V' NOO _ _ Z Z W M m nNm V V 0 0 n ( N N o M M of r O s f m< °'v N N m m rn an0 a G M o 0 0 O O o oNu': N C� V V 616 O O Z Z N h st . h 0 0 - - IOp jp r m of OVn�r W NO w " n m m M r vuNi�m�n NNN m O rn rn �mMm M v m 0 i N O 'i N CItV N CNJ O C Z Z t�0 N MOf th . 0 0 - [ 1p l0 V u) o m� N rnrnmn O m .. N N M vi�v 110 N N m N m N h r th rn m mV NWmr rnrnm OIp N m m m O> N C V r W O O Z Z n N M�tJ fV 0 0 ip tp r ui r m l 10 N N N Oi m OWN m r N N V m W m N V 0 1p cl rn rn MWvn h9ps"DNWoo .-O m a 1� N m M 21 91 03 DBL,. a Oudean Hilcorp Alaska, LLC GeoTech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 1tamrp Alurka.. 11,11; Fax: 907 777-8510 E-mail: doudean@hilcorp.com DATE 12/12/2019 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician RECEIVED W. 7t" Ave. Ste#100 G Anchorage, AK 99501 DEC 13 2019 /A-%(',GGC �]-431674 -431675 -)31676 31677 CD: Final Well Data GP-55RD FINAL DATA ASCII Data CGM PDF Surrey Data TIFF V GP-55RDPB1 FINAL DATA ASCII Data CGM PDF Survey Data TIFF V GP-55RDPB2 FINAL DATA ASCII Data CGM PDF Survey Data TIFF GP-55RDPB3 FINAL DATA ASCII Data CGM PDF Survey Data TIFF Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Hilanrh Abiskm, UA; DATE 12/12/2019 Debra Oudean Hilcorp Alaska, LLC GeoTech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: doudean@hilcorp.com To: Alaska Oil & Gas Conservation Commission Meredith Guhl, Petroleum Geology Assistant 333 W. 7t" Ave. Ste#100 Anchorage, AK 99501 GP -55 RD (219-103) GP 55RD PB1 GP 55RD PB2 GP 55RD PB3 Transmitted herewith are cuttings WELL BOX # SAMPLE INTERVAL GP 55RD 1 OF 3 9240' - 10,740' GP 55RD PB1 2 OF 3 9810' - 10345' GP 55RD PB2 2 OF 3 10380' - 10685' GP 55RD PB3 3 OF 3 1 10380'- 11040' I l z9 (_30 RECEIVED CSC 12 2019 AOGCC Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Receiv'�By/� Date: I/-), . aUA 1 /lo/202_0 THE STATE 'ALASKA GOVERNOR MIKE DUNLEAVY Monty Myers Drilling Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Granite Point Field, Middle Kenai Oil Pool, GP 55RD Permit to Drill Number: 219-103 Sundry Number: 319-513 Dear Mr. Myers: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, VJePrice Chair DATED this\5 day of November, 2019. 3SDMS LA' NOV 14 2019 SCANNED NOV 2 5 2019 NEDEIVED STATE OF ALASKA NOV 0 8 2019 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS AOGCC. 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown Q Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Hilcorp Alaska, LLC Exploratory ❑ Development 0 . Stratigraphic ❑ Service ❑ 219-103 3. Address: 6. API Number: 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 50-733-20479-01-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? N/A Will planned perforations require a spacing exception? Yes E]No Q Granite Point SSRD , 9. Property Designation (Lease Number): 10. Field/Pool(s): ADLO18761 Granite Point Field / Middle Kenai Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 10,756' 9,464' ±10,196' ±9,005' N/A N/A N/A Casing Length Size MD TVD Burst Collapse Structural 229' 33" 229' 229' Conductor 306' 26" 306' 306' Surface 1,318' 13-3/8" 1,318' 1,318' 3450 psi 1950 psi Intermediate 4,997' 9-5/8" 4,997' 4,091' 10900 psi 7950 psi Production 5,599' 7" 10,395 (TOW) 9,345' 8160 psi 7030 psi Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): N/A N/A N/A N/A I Packers and SSSV Type: N/A Packers and SSSV MD (ft) and TVD (ft): N/A 12. Attachments: Proposal Summary 0 Wellbore schematic Q 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development Q ' Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 11/7/2019 OIL ❑ WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Yes Date: 11/7/2019 Commission Representative: Guy Schwartz GINJ ❑ Op Shutdown ❑✓ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Monty Myers Contact Name: Monty Myers Authorized Title: Drilling Manager Contact Email: 1T m erS iIIIcor .corn Contact Phone: 777-8431 Authorized Signature: Date: COMMISSION US ONLY Conditions of approval: Notify Commission so that a represents ive may witness Sundry Number: Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test EJ Location Locationn Clearance Other: � !_` (.4.1 C � i ✓ "�� l G- iri.c� �..�.G�rG> .�C_ L J : o'7 � Post Initial Injection MIT Req'd? Yes ❑ No ❑ , `-J `i ( NOV 14 2019 Spacing Exception Required? Yes No Subsequent Form Required: [? '' 0 IBDMS APPROVED BY �` 1 Approved by: COMMISSIONER THE COMMISSION Date: u JX (`�'' �� 8 bmit Form and Forr 10-�U3 Re se 2017 o� r Approved applicati a N r n the date of approval. /�Attachments in Duplicate ?a Ilileorp Alaska, LLI Well Prognosis Well: GP-55RD Date: 11/7/19 Well Name: GP 55RD API Number: 50-733-20479-01-00 Current Status: P&A Production Hole Leg: 4 Estimated Start Date: November 7th, 2019 Rig: Spartan 151 Reg. Approval Req'd? 403 Date Reg. Approval Rec'vd: 11/7/2019 Regulatory Contact: Cody Dinger 777-8389 Permit to Drill Number: 219-103 First Call Engineer: Monty Myers (907) 777-8431 (0) (907) 538-1168 (M) AFE Number: Brief Well Summary — While drilling ahead in our 6-1/8" production hole at 10,756' we encountered severe losses. We pumped 80 ppb LCM pills and brought our background LCM in our mud up to 40 ppb. We never could get the losses to heal with LCM so we POOH and spotted 25 bbls of cement as a loss circulation plug. After POOH and making up a drilling assembly, we ran in the hole to find TOC. We never encountered a TOC and when we got to 10,745' we lost circulation again. The decision was made to abandon this well and re -plan a different trajectory for a later date. Notes Regarding Wellbore Condition — TOW at 10,395' 6-1/8 hole to 10,756' Rig 151 Procedure — Work to be performed: • RIH with a cement retainer and set it at 10,380' TMD. • Establish an injection rate • Mix and pump the remaining cement we have on the jackup (^'80 bbls) of cement mixed to a 13.5 ppg • We will unsting from the retainer with 5 bbls left inside pipe and lay 5 bbls of cement on top of the retainer. • Estimated TOC will be - 10,196' • We will reverse circulate the well clean and displace the OBM from the well at 10,240' with FIW with corrosion inhibitor. • POOH and LD retainer running tools • Pressure test casing to 2500 psi • RU and run —450' of 2-7/8" tubing for a kill string • ND BOPE • RU Tree and test • Skid to GP53RD to perforate and run the completion. Attarhmantc 1. Actual Schematic 'H Hilcorp Alaska, LLC RKB =132' 26" 13-3/8" 9-5/8" Current Schematic Granite Point Field Well: GP 55RD Last Completed: Future PTD: 219-103 API: 50-733-20479-01-00 CASING DETAIL Size Wt Grade Conn ID Top Btm 26" Conductor Whipstock (Not Pictured) Surf 306' 13-3/8" 68 K-55 BTC 12.415 Surf 1,318' 9-5/8" 53.5 P-110 BTC 8.535 Surf 4,997' 7" 26 L-80 DWC/C 6.276" 4,796' 10,395' (TOW) TUBING DETAIL 2-7/8" 6.4 L-80 IBT 1 2.441 1 Surface 450' JEWELRY DETAIL PBTD: ±1Q196' MD TD: 10,756' MD Updated By: CD 11/8/2019 No �MD� Item 1 10,395' Whipstock (Not Pictured) PBTD: ±1Q196' MD TD: 10,756' MD Updated By: CD 11/8/2019 lc "„/ 5 bbis piTpedon top d Retainer, Est TOC 10,196'ND Crrf Retainer -10,327 NID TOW -10,395' k' • is j .............. .............. w ; 7' 1 i' R- ��,,��. 106 bbis pumped below Retainer PBTD: ±1Q196' MD TD: 10,756' MD Updated By: CD 11/8/2019 THE STATE P 0 a F40111 GOVERNOR MIKE DUNLEAVY Monty Myers Drilling Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Alaska Oil and Gas Conservation Commission Re: Granite Point Field, Middle Kenai Oil Pool, Granite Point 55RD Permit to Drill Number: 219-103 Sundry Number: 319-490 Dear Mr. Myers: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 1 Je Price Chair DATED this I day of November, 2019. 3BDMSLAwN0V 0 5 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 RECEIVED OCT 3 0 2019 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ perations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: Abandon BHA (RA) ❑✓ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Hilcorp Alaska, LLC Exploratory ❑ Development Q Stratigraphic ❑ Service ❑ 219-103 3. Address: 6. API Number: 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 50-733-20479-01-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? N/A Will planned perforations require a spacing exception? Yes ❑ No 0 Granite Point SSRD 9. Property Designation (Lease Number): 10. Field/Pool(s): ADLO18761 Granite Point Field / Middle Kenai Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 11,044' 9,611' 10,527' 9,300' N/A N/A 10,527 (TOF) Casing Length Size MD TVD Burst Collapse Structural 229' 33" 229' 229' Conductor 306' 26" 306' 306' Surface 1,318' 13-3/8" 1,318' 1,318' 3450 psi 1950 psi Intermediate 4,997' 9-5/8" 4,997' 4,091' 10900 psi 7950 psi Production 5,599' 7" 10,395 (TOW) 9,345' 8160 psi 7030 psi Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): N/A N/A N/A N/A N/A Packers and SSSV Type: N/A Packers and SSSV MD (ft) and TVD (ft): N/A 12. Attachments: Proposal Summary Q Wellbore schematic Q 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development Q Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 10/29/2019 OIL ❑✓ WINJ ❑ GAS ❑ WAG ❑ WDSPL ❑ Suspended ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Yes Date: 10/29/2019 Commission Representative: Guy Schwartz GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Monty Myers Contact Name: Monty Myers Authorized Title: Drilling Manager Contact Email: 17 m erS hilcor .Conn Contact Phone: 777-8431 Authorized SignatDate: 10-3o.17 COMMISSION USE ONLY , Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 5 n I -q90 q 9 U Plug Integrity ❑ BOP Test E]Mechanical Integrity Test E] Location Clearance Other: IBDMS NOV 0 5 2019 Post Initial Injection MIT Req'd? Yes No Spacing Exception Required? Yes ❑ No Subsequent Form Required: r { APPROVED BY 1 Approved by: COMMISSIONER THE COMMISSION Date: I 11 ��I (� l O 7/ - r✓ Submit Form and Form 10-403 Revised 4/2017 Approved application ,i slid for 12 months frod%e a I. Attachments in Duplicate I U Ililcorp Alaska, LLI Well Prognosis Well: GP-55RD Date: 10/29/19 Well Name: GP 55RD API Number: 50-733-20479-01-00 Current Status: Abandon sources & OH Leg: 4 Estimated Start Date: October 29th, 2019 Rig: Spartan 151 Reg. Approval Req'd? 403 Date Reg. Approval Rec'vd: 10/29/2019 Regulatory Contact: Cody Dinger 777-8389 Permit to Drill Number: 219-103 First Call Engineer: Monty Myers (907) 777-8431 (0) (907) 538-1168 (M) AFE Number: 11,033 11 625 Brief Well Summary— While drilling ahead in our 6-1/8" production hole at 11,044' TMD, we were preparing to make a connection and were back reaming a stand of drill pipe. We were circulating and rotating at full drilling rate and when we pulled up to 11,033' TMD the BHA became stuck. We jarred with drilling jars (jar up/bump down) until fishermen arrived on location. When the fishermen arrived we rigged up e -line and RIH with a string shot and performed a string shot back off at 10,405', just above the window. We tripped out of the hole and laid down our drilling jars and ran back in hole with an intensifier and fishing jars (jar up/jar down) and proceeded to attempt to recover the fish. After 5 hours of jarring the decision was made to attempt to get e - line down to below the nuclear sources and attempt a back off. While RIH with e -line and a string shot, we tagged up at 10,560' numerous times. After unsuccessfully getting down any further the decision was made to back off at 10,527'. After firing the shot we were successful at freeing the pipe and we still had to jar and pump to get the drill pipe free. Notes ReaardinR Wellbore Condition — Rig 151 Procedure — 7 Work performed: • Backed off at 10,527' TMD with a string shot and left hand torque • POOH and laid down HWDP and fishing equipment • MU 2-7/8" mule shoe sub and 500' of 2-7/8" tubing • Contacted NRC and have approval to isolate BHA and sources (James Thompson 10/29/19 10:33 am) Work to be performed: • RIH with a 2-7/8" cement stinger and 500' of tubing and spot 10 bbls of cement from 10,527' to 10,255'. (This is 4.3 bbls inside 6-1/8" OH and 5.7 bbls inside 7" 29# casing.) • POOH with cement stinger • PU cleanout BHA and drill out cement to 50' below bottom of window to 10,458' TMD • POOH and PU drilling BHA w/o nukes and RIH and drill production hole Attachments 1. Proposed RA Source Abandonment Schematic RID ftfrom TD ftfrom BO..' Top of window 10,395 649 Bottom of window 10,408 636 Top of fish 10,527 517 119 Nuclear source IJeutron 10,941 103 533 Nuclear source Density 10.951 93 543 Bottom offish 11,033 11 625 Total depth of well 11.044 636 Rig 151 Procedure — 7 Work performed: • Backed off at 10,527' TMD with a string shot and left hand torque • POOH and laid down HWDP and fishing equipment • MU 2-7/8" mule shoe sub and 500' of 2-7/8" tubing • Contacted NRC and have approval to isolate BHA and sources (James Thompson 10/29/19 10:33 am) Work to be performed: • RIH with a 2-7/8" cement stinger and 500' of tubing and spot 10 bbls of cement from 10,527' to 10,255'. (This is 4.3 bbls inside 6-1/8" OH and 5.7 bbls inside 7" 29# casing.) • POOH with cement stinger • PU cleanout BHA and drill out cement to 50' below bottom of window to 10,458' TMD • POOH and PU drilling BHA w/o nukes and RIH and drill production hole Attachments 1. Proposed RA Source Abandonment Schematic Granite Point Field ' O P OS E D RA Well: GP 55RD Last Completed: Future Abandonment PTD: 219-103 1Iilcorp Alaska, LLC API: 50-733-20479-01-00 RKB =132' 26" 13-3/8" 9-5/8" TOC 10,255' IVU TOW-10,395''"� '" ♦' 7", T � �• t �� �Air„w�k TO 0,52T PBTD(TOF): 10,527' MD TD: 11,044' MD CASING DETAIL Size Wt Grade Conn ID Top Btm 26" Conductor Surf 306' 13-3/8" 68 K-55 BTC 12.415 Surf 1,318' 9-5/8" 53.5 P-110 BTC 8.535 Surf 4,997' 7" 26 L-80 DWC/C 6.276" 4,796' 10,395' (TOW) TUBING DETAIL JEWELRY DETAIL 9 A �� 1-('14 Updated By: OD 10/29/2019 No �MD� Item 1 10,395' Whipstock (Not Pictured) 9 A �� 1-('14 Updated By: OD 10/29/2019 'Schwartz, Guy L (CED) From: Mack Myers <mmyers@hiicorp.com> Sent: Tuesday, October 29, 2019 12:10 PM To: Schwartz, Guy L (CED) Cc: Cody Dinger Subject: RE: [EXTERNAL] RE: PTD (219-103) GP55RD - Stuck BHA with Nukes Attachments: GP 55RD 10-403 Abandon Sources Program.docx Guy, I attached the updated proposal for fishing and cementing operations. I have a 10-403 drafted, but do not have the schematic to go with it at the moment. I will get the schematic and 10-403 submitted to you by tomorrow. We did receive approval from the NRC to go ahead and proceed with the cement abandonment of the BHA. Please let me know if you have any questions or concerns with the procedure and we will get the documentation to you ASAP. Thank you! Monty M Myers Drilling Manager 907.538.1168 (c) 907.777.8431 (o) From: Schwartz, Guy L (CED) [mailto:guy.schwartz@alaska.gov] Sent: Tuesday, October 29, 2019 9:53 AM To: Mack Myers <mmyers@hilcorp.com> Subject: [EXTERNAL] RE: PTD (219-103) GP55RD - Stuck BHA with Nukes Monty, Please submit sundry to abandon RA source BHA. Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE. This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Guy Schwartz at (907-793-1226 ) or (Guy.schwartz@alaska.gov). From: Mack Myers <mmyers@hilcorp.com> Sent: Tuesday, October 29, 2019 9:03 AM To: Schwartz, Guy L (CED) <guy.schwartz@alaska.gov> Cc: Cody Dinger <cdinger@hilcorp.com> Subject: PTD (219-103) GP55RD - Stuck BHA with Nukes Good morning Guy, While drilling ahead in our 6-1/8" production hole at 11,044' TMD, we were preparing to make a connection and were back reaming a stand of drill pipe. We were circulating and rotating at full drilling rate and when we pulled up to 11,033' TMD the BHA became stuck. We worked to free the BHA without success. We rigged up a -line and were unable to get past 10,560'TMD. We pulled up hole and performed a string shot back off at 10,527'. With this back off, we left 507.5' of BHA in the hole. The nukes are at 10,941' TMD and 10,951' TMD and there is 414' of steel on top of the BHA isolating us from the nukes. TkID ft from TD ftfrom B01.V Top of window 10.395 649 Bottom of window 10.408 636 Top offish 10.527 517 119 Nuclear source Neutron 10.941 103 533 Nuclear source Density 10.951 93 543 Bottom offish 11.033 11 625 Total depth of well 11.044 636 Our plan forward is: • RIH with a 2-7/8" cement stinger and 500' of tubing and spot 10 bbls of cement from 10,527' to 10,255'. (This is 4.3 bbls inside 6-1/8" OH and 5.7 bbls inside 7" 29# casing.) • POOH with cement stinger • PU cleanout BHA and drill out cement to 50' below bottom of window to 10,458' TMD • POOH and PU drilling BHA w/o nukes and RIH and drill production hole Please let me know if you have any questions or concerns with this plan. Baker Hughes has been in touch with James Thompson at the NRC 301-816-5100 and we haven't received approval to spot cement from them yet. We are currently running in the hole with tubing and will wait for approval from AOGCC and NRC prior to pumping cement. Monty M Myers Drilling Manager 907.538.1168 (c) 907.777.8431 (o) The information contained in this e-mail message is confidential information intended only for the use of the recipient(s) named above. In addition, this communication may be legally privileged. If the reader of this e-mail is not an intended recipient, you have received this e-mail in error and any review, dissemination, distribution or copying is strictly prohibited. If you have received this e-mail in error, please notify the sender immediately by return e-mail and permanently delete the copy you received. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. RECEIVED IED STATE OF ALASKA SEP U 9 1019 ALASKA OIL AND GAS CONSERVATION COMMISSI4�N/AlOGICC APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ R air Operations shutdown ❑ Suspend ❑ Perforate ❑✓ Other Stimulate ❑ PI n Change Approved Program ❑ Plug for Redrill ElPerforate New Pool ElRe-enter Susp Well ElA ng El Other: G/L Completion ❑� 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Hilcorp Alaska, LLC Exploratory El Stratigraphic ElServi Develop en ❑✓ ❑ 219-103 ' 3. Address: 3800 Centerpoint Drive, Suite 1400 6. API Number: Anchorage, AK 99503 50-733-20479-01-00 ' 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? 76A Will planned perforations require a spacing exception? Yes ❑ o GP-55RD 9. Property Designation (Lease Number): 10. Field/Pool(s): ADL0018761 Granite Point Field / le Kenai Oil Pool ' 11. PRESENT WELL CONDITIO ARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effectiv DeMPSP (psi): Plugs (MD): Junk (MD): ±1 5,086' (proposed) ±1 0,332' (proposed) ±1 5,000' (proposed) ±10,322'( osed) 1,991 psi N/A NIA Casing Length Size C -IM TVD Burst Collapse Conductor 229' 33" 29' J 10 229' Conductor 306' 26" 306' 306' Surface 1,318' 13-3/8" 1,318' 1,318' 3,450 psi 1,950 psi Production 4,997' 9-5/8" 4,997' 4,104' 10,900 psi 7,950 psi Liner ±4,686' (proposed) 7" ±9,500' (proposed) ±8,328' (proposed) 7,240 psi 5,410 psi Liner ±5,786' (proposed) ±15,086' (proposed) ±10,332' (proposed) 13,620 psi 13,470 psi Perforation Depth MD (ft): Perforation Depth TVD (.it1 Tubing Size: Tubing Grade: Tubing MD (ft): N/A N/A A N/A N/A Packers and SSSV Type: AJ Packers and SSSV MD (ft) and TVD (ft): N/AGNI.-IN/A 12. Attachments: Proposal Summary ❑✓ ellbore hematic Q 13. Well Class after proposed work: Detailed Operations Program ❑ Sketch ❑� Exploratory ❑ Stratigraphic ❑ Development ❑� Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 11 /1 /2019 OIL Q GAS ❑ WINJ ❑ WDSPL ❑ Suspended ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoi g is true and the procedure approved herein will not be deviated from without prior w en approval. Authorized Name: Stan . Golis Contact Name: Dan Marlowe Authorized Title: Ope ations Manager Contact Email: dmar1owe hilCOr .COm G Contact Phone: (907) 283-1329 Authorized Signature: ld �� Date: 7 a COMMIJSION USE ONLY Conditions of approval: otify Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: RBDMSL NOV Post Initial Injection MIT Req'd? Yes ❑ No ❑ U p 2019 Spacing Exception Required? Yes ❑ No Eq," Subsequent Form Required: APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: OdR '\ I �4. Submn Form and Form 10-403 Revised 4/2017 Approved application is n � f�,•,lL a date of approva p�/ Attachments in Duplicate f �,J(�r $ q lei 4% Well Work Prognosis Hilcorp Alarka, LLC Well Name: Granite PT ST 55rd(GP-55rd) API Number: 50-733-20479-01 Current Status: Suspended Leg: Leg #4 Estimated Start Date: November 01, 2019 Rig: Spartan 151 or HAK 404 Reg. Approval Required? 403 Date Reg. Approval Received: Regulatory Contact: Juanita Lovett (8332) Permit to Drill Number: 219-103 First Call Engineer: Dan Marlowe (907) 283-1329 (0) (907)398- 9904 (M) Second Call Engineer: Monty Myers (907) 777-8431 (0) (907) 538-1168 (M) Current Bottom Hole Pressure: 2,943 psi @ 9,521' TVD 0.309 lbs/ft (5.94 ppg) based on offset producers Maximum Expected BHP: 2,943 psi @ 9,521' TVD 0.309 Ibs/ft (5.94 ppg) based on offset producers Maximum Potential Surface Pressure: 1,991 psi Using 0.1 psi/ft gradient 20 AAC 25.280(b)(4) Brief Well Summary GP-55rd is a C-7 producer that will be completed with Gas Lift. This new well was drilled from the current GP -55 a suspended drill well. This workover will run completion and perforate the new well. Timing and completion rig will be based on timeliness of getting well drilled, if we are significantly ahead of schedule we will complete with Spartan 151, if we are running tight on schedule we will complete in November with the HAK-404 Last Casing Test: Casing and liner tested to 2,500 psi under PTD 219-103 Procedure: 1. ***Take over operations from the Drilling Sidetrack Program *** 2. Test BOP's every 14 days continued from last test date from PTD 219-103. Test to 250psi low/2,500psi high / 1,500 psi annular. (Note: Notify AOGCC 48 hours in advance of test to allow them to witness test). 3. Completion fluid will be diesel. BOP's will be closed as needed to circulate the well. 4. ** If not already completed under PTD 219-103, Rig up E -Line and run gamma/ccl/cbl. 5. PU and RIH with TCP guns, Correlate on depth and perforate. 6. Circulate bottoms up and assure well is static, release underbalance packer, circulate again and ensure well is static. POOH 7. PU and RIH with Gas Lift completion. 8. Set Packer/ Pressure test completion: • Pressure up and set packer • Test tubing against plug in XN nipple to 2500# and chart for 30 minutes. • Test IA to 2,000 psi and chart for 30 minutes (This will pressure up tubing also). • Pull prong and plug in XN-Nipple. 9. Set BPV. NU tree, test same. 10. Turn over to production. 11. Schedule SVS testing with AOGCC as per regulations. Attachments: 1. Well Schematic Current 2. Well Schematic Proposed 3. Wellhead Schematic Proposed 4. BOP Drawing—Spartan 151 5. Fluid Flow Diagrams—Spartan 151 6. BOP Drawing — HAK 404 7. Fluid Flow Diagrams — HAK 404 8. RWO Sundry Revision Change Form Hileorp Alaska, LLC Imo: 43.44' .z 33" @ 229' 26" @ 306' pit i. r s+ 9558" @ 5,011' r'L PBTD = 4,8647ND (4,OOT TVD) TD=5,011'ND(4,100' TVD) Directional Data: max hole angle = 51.30 @ 4,667' SCHEMATIC Granite Point Field Well Name: GP -55 Completion Date: 8/26/1997 PTD: 197-145 API: 50-733-20479-00 Size Type Wt/ Grade Top Btm CONN ID Cement/Other 33" Conductor Surf 229' Driven 26" Conductor Surf 306' Driven 299bbl 12.9ppg 13-3/8" Surface 68#, K-55 Surf 1,318' BTC 12.415" lead, 49.3bbl 15.8ppg tail 458bbl 12.9ppg 9-5/8" Production 53.5#, P- Surf 4,997' BTC 8.535" lead, 37bbl 110 15.8ppg tail Updated by JLL 07/17/2019 Hilcorp Alaska, LLC RKB =132' PBTD: ±15,000' MD TD: 15,086' MD PROPOSED Granite Point Field Well: GP 55RD Last Completed: Future PTD: 219-103 API: 50-733-20479-01 CASING DETAIL Size Wt Depth (TVD) Grade Conn ID Top Btm 33" 5SSV Conductor ±2,562' ±2,500' Surf 229' 26" ±5,284' Conductor 2.441" GLM #2 Surf 306' 13-3/8" 68 K-55 BTC 12.415 Surf 1,318' 9-5/8" 53.5 P-110 BTC 8.535 Surf 4,997' 7" 26 L-80 DWC/C 6.276" ±4,814' 9,500' 5" 18 P-110 Hydril511 4.276" ±9,300' 15,086' TUBING DETAIL 2-7/8" 6.5 L-80 8 rnd EUE 1 2.441" Surf ±107800 JEWELRY DETAIL No Depth (MD) Depth (TVD) ID OD Item 1 ±350' ±350' 2.313" 5SSV ±2,562' ±2,500' 2.441" GLM #1 ±5,284' ±4,300' 2.441" GLM #2 ±6,594' ±5,500' 2.441" GLM #3 ±7,416' ±6,300' 2.441" GLM #4 ±7,930' ±6,800' 2.441" GLM #5 2 ±8,444' ±7,300' 2.441" GLM #6 ±8,957' ±7,800' 2.441" GLM #7 ±9,471' ±8,300' 2.441" GLM #8 ±10,040' ±8,850' 2.441" GLM #9 ±10,681 ±9,390' 2.441" GLM #10 - Orifice 3 ±10,730' ±9,411' 1.975" 3.669" Halliburton ROC Gauge Mandrel w/ 0.25" TEC wire 4 ±10,760' ±9,431' Packer 5 ±10,790 ±9,451' 1.791" XN-Nipple 6 ±10,800 ±9,457' WLEG PERFORATION DETAIL Zone (op (MD) (TVD) Btm Top Btm (TVD) FT Date Status C-7 ±10,900' ±14,500' ±9,535' ±10,266' ±3,600' Future Proposed Updated By: JLL 09/05/2019 Rilmrp Alapka,1,Id: Granite Point GPP 53 and 55 133/8 x 95/8 x 31/2 Valve, Swab, 3 1/8 5M FI EE tri Valve, Master, 3 1/8 5M FE, EE trin Valve, Master, 3 1/8 5M FE, EE trin Tubing head attachment, Cactus -TC -60, 11 5M FE X 13 5/8 5M API hul bottom Unihead, KvaernerSMS, 3 step system, 13 5/8 SM AN Hub top X 13 3/8 BTC casing bottom, w/ 2- 2" LPO, 4- 2 1/16 5M SSO Granite Point Platform GP -55 Proposed Tubing hanger, Cactus -TC - EN -CCL, 11 x 3 % EUE 8rd lift and susp, w/ 3" type H-BPV profile, 3-%npt control line port, 6'/. EN BHTA, Bowen, 3 1/8 SM FE x 2.5 bowen quick union top eta�oc, GP 53RD Drilling Procedure Rev 0 Hilcorp Alaska, LLC 21.0 BOP Schematic Page 34 Revision 0 May, 2019 llilcorp Alaska, 1.1.1: 28.0 Choice Manifold Schematic CEMENT STANDPIPE DIRECT THRU PANIC LI` E r..raauc CW.k[ GP 53RD Drilling Procedure Rev 0 STAND PIPE 02 STAND PIPE r1 10 r_�-r cnrsreC"%1co a. JA1G.v� sddxr<r pin ur.• 10 cna.o<tu v 2+ 1 u Tc Crnent Uni! CHOKE UNE BE-i�-- soaoscm FILL UP., LO-TOROUEVALVE VAIV[ BLEEDOFF ❑ LINE TO BELL Bet NIPPLE t:i�p!a • ua 23 r[sr aao« r) nw 6 13-5 tOM! DOUBLE Y f`9E ItVA O CAMERON TYPE U RALIS B:M:HttA My C 4.VI6' IOM Manual and HCR val-s o. WO Lfar Side »iU 110A1 tr 15!A OSAF :-1'16. 1C'A 6fan�at aid? -v!6'. t6!A MCR an Chc#e tiaa sre 1CL! by i%I OSAF CHOKE AND KILL LINES FROM HCR TO LIAY!FOLDS ARE 151,1 19 21 / s•vvE rwu O 3.1!16' IOM by ISM DSAF 3.1/16' 15M by 10 M DSAF 41 -NIG' IOM by 3.1116' TOM DSAF 3-1116" 10M by 4-1116' IOM Spool 13S•0' 1C1A SINGLE ,>;: ,✓•a�r.rFCK CAMERON TYPE RAR! Page 43 Revision 0 May, 2019 Hiltsirp Ala"ka, I.M. Granite Point Platform BOP - HAK 404 Jariable rams 27/8-5 Blind Rams C U Ou0u ..... OOUO ............ UOUOUODUODU O 0 a n a a u u u u u u u a C � U U U U V U U U V O 0 0 0 0 0 U N O a 0 0 0 0 O O a v c 2 E E E E E o o o L o o o 0 a 0 o 01 c v n >> d d d d a == U t Y it 2 U t L L L L L U U U U U U U U U U vi .a o c a '^ u °' o 0 LL C O U '= o p u 0 0 0 O O U O O u O V O V O V U O V U O °1 0 U - U U U U U U U U V - - - - O- 0 0 0 0 0 t 0 0 0 0 0 0 0 0 0 0 x _ _ _ Y 0 y C G C C C W C cCCCCCC c c c 0 > E E E E E C 01 -' u 0 J 01 N N N N N 0 0 0 0 0 0 0 0 0 0 L J � � d U L I V L L L L L U U U U u L U L U L L U U U U vJt V1 dO C O O � d 0 U C O LL U wo L7\ ct V1 ct O ca � U U C � E O) OU c �N E 4 O L 0 > > _0 L Q ::3 Q. Q - m a) L C N O O 0) O N � U N O 0 o � cu �c o� L Q L m� EU mU -� C7 a) O cQ (D E U a) O •_ O a) °' -a r �o c U ca _ C70N O L Q Qa Q V d N Q LO m r, = Q _ Q G1 N Y L LC Q CLM W _ M C � � Z Z � t U a� m 0 a` 0 a� as V ZI O m Q - a) roll LL Carlisle, Samantha J From: Schwartz, Guy L([E[) Sent: Thursday, November 7.20199:04AM To: Mack K4yenzCody Dinger [c: Carlisle, Samantha] ([EO) Subject: RE: PTD #219-103 (GP55RD P&A Prod Hole) The AOGCC will also withdraw the Completion Sundry 319-410 as requested . Guy Schwartz Sr. Petroleum Engineer AOGC[ 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (ADGCC).State ofAlaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. It you are an unintended recipient ofthis e-moi|.please delete it, without first saving o/forwarding it, and, sothat the ^DGCCisaware ofthe mistake insending i|to you, contact Guy Schwartz n|(9077pJ-/zc^)cv( From: Schwartz, Guy L(CED) Sent: Thursday, November 7,20199:OZAM To: 'Mack Myers' <mmyers@hilcorp.com>; Cody Dinger <cdinger@hilcorp.com> Subject: RE: PTD#219'1O3(GP5SRDP&A Prod Hole) You have verbal approval to suspend operations (Operational Shutdown) for the well as proposed. Submit a 10-403 sundry ASAP. Include aJSUUpsi pressure test ofthe casing after pumping cement. A 10-404 report will be required ( vs 10-407 ) since well won't be reentered within 30 days. (see 20AA[Z5.072(b) It will need toinclude all logs and reports for the well todate. Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, conk/ms information from lie Alaska Oil and Gas Conservation Commbdon(AOGCC).State ofAlaska and isfor the sole use o[the intended recipient (s)|tmay contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding if, and, so that the AOGCC is aware of the mistake in sending it to you, contact Guy Schwartz at (907-793-1226 ) or (Guy.schwartz@alaska.gov) From: Mack Myers Sent: Thursday, November 7,I0197:09AM To: Sc"nwartz, Guy L (CED) <guV.schwartz@alaska.gov>; Cody Dinger <cdinger@hilcorp.com> Subject: PTD #219-103 (GP55RD P&A Prod Hole) Good morning Guy, After our discussion last Friday about the possibility of P&A on this hole section and RDMO, we have arrived at that decision. After multiple attempts to cement the losses that we have seen while drilling the 6-1/8" production hole, we have decided that is time to cut this well short and set a retainer and squeeze the hole that we have drilled. Our plan forward is to: • RIH with a cement retainer and set it at 10,380' TMD. • Establish an injection rate • Mix and pump the remaining cement we have on the jackup (-80 bbls) of cement mixed to a 13.5 ppg • We will unsting from the retainer with 5 bbls left inside pipe and lay 5 bbls of cement on top of the retainer. • Estimated TOC will be - 10,245' • We will reverse circulate the well clean and displace the OBM from the well at 10,240' with FIW with corrosion inhibitor. • POOH and LD retainer running tools • RU and run —450' of 2-7/8" tubing for a kill string • ND BOPE • RU Tree and test • Skid to GP53RD to perforate and run the completion. We will write up and send over a 10-403 today documenting the changes and will also request to withdraw the completion sundry #319-410. Thank you! Please let me know if you have any questions or concerns. Monty M Myers Drilling Manager 907.538.1168 (c) 907.777.8431 (o) The information contained in this e-mail message is confidential information intended only for the use of the recipient(s) named above. In addition, this communication may be legally privileged. If the reader of this e-mail is not an intended recipient, you have received this e-mail in error and any review, dissemination, distribution or copying is strictly prohibited. If you have received this e-mail in error, please notify the sender immediately by return e-mail and permanently delete the copy you received. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. THE STATE 'ALASKA GOVERNOR MIKE DUNLEAVY Monty Myers Drilling Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Alaska Oil and Cas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Re: Granite Point Field, Middle Kenai Oil Pool, GP-55RD Hilcorp Alaska, LLC Permit to Drill Number: 219-103 Surface Location: 2437' FNL, 1303' FWL, SEC. 13, TI ON, RI 2W, SM, AK Bottomhole Location: 1504' FSL, 2532' FWL, SEC. 23, TION, R12W, SM, AK Dear Mr. Myers: Enclosed is the approved application for the permit to redrill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, C' essie L. Chmielowski Commissioner DATED this 3 ) day of July, 2019. G STATE OF ALASKA A. jKA OIL AND GAS CONSERVATION COMB 31ON PERMIT TO DRILL 20 AAC 25.005 ECF JUL 17 2019 1 a. Type of Work: 1b.. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well is proposedifor: Drill ❑ Lateral ❑ Stratigraphic Test ❑ Development - Oil ❑✓ Service - Winj ❑ Single Zone ❑� Coalbed Gas ❑ Gas Hydrates ❑ Redrill Q • Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Q • Single Well ❑ 11. Well Name and Number: Hilcorp Alaska, LLC Bond No. 022035244 GP-55RD ' 3. Address: 6. Proposed Depth: 12. Field/Pool(s): 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 MD: 15,086' - TVD: 10,332' Granite Point Field Middle Kenai Oil Pool 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: 2437' FNL, 1303' FWL, Sec 13, T10N, R12W, SM, AK ADLO18761 ,.A-' IS( 'k Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: 375' FSL, 1071' FEL, Sec 14, T1 ON, R12W, SM, AK LOCI 19-001 8/15/2019 9. Acres in Property: 14. Distance to Nearest Property: Total Depth: 1504' FSL, 2532' FWL, Sec 23, T1 ON, R12W, SM, AK 5089 4204' to nearest unit boundary 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 132' 15. Distance to Nearest Well Open Surface: x-263339 y-2544494 ' Zone -4 GL / BF Elevation above MSL (ft): N/A Ito Same Pool: 500' to GP 42 -23RD 16. Deviated wells: Kickoff depth:feet 17. Maximum Po t'ifal �P/r/essures in psig (see 20 AAC 25.035)54 Maximum Hole Angle: 3. degrees Downhole: 3 3 &)&Y4 Surface: Z- 18. 18. Casing Program: Specifi ations Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8-3/8" 7" 26# L-80 DWC/C 4,686' 4,814' 3,987' 9,500' 8,328' L - 591 sx 6-1/8" 5" 18# P-110 Hyd511 5,786' 9,300' 8,133' 15,086' 10,332' L-436sx 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 5,011' 4,100' N/A 4,864' 4,006' N/A Casing Length Size Cement Volume MD TVD Conductor/Structural 306' 26" Driven 306' 306' Surface 1,318' 13-3/8" L - 299 bbl / T - 49.3 bbl 1,318' 1,318' Intermediate 4,997' 9-5/8" L - 458 bbl / T - 37 bbl 4,997' 4,091' Production Liner Perforation Depth MD (ft): N/A Perforation Depth TVD (ft): N/A Hydraulic Fracture planned? Yes ❑ No ❑� 20. Attachments: Property Plat ❑ BOP Sketch Drilling Program Time v. Depth Plot Shallow Hazard Analysis ❑ ❑ ❑✓ ❑ Diverter Sketch Seabed Report Drilling Fluid Program 20 AAC 25.050 requirements 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Monty Myers Authorized Name: Monty Myers Contact Email: rt' M erS hllCor .Com Authorized Title: Drilling Manager Contact Phone: 777-8431 7 Authorized Signature: Date: Commission Use Only Permit to Drill �_ � API Number: ' / ' L Permit Approval 181 See cover letter for other Number: 50-7 ��' Date: requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed ethane, as hydrates, or gas contained in shales: � �j � Other: � � w ���T �'p LSG�� � Samples req'd: Yes ❑ No [vf Mud log req'd: Yes ❑ o [� HZS Yes ❑ No[ No❑ measures: Directional svy req'd: Yes Z 7 y LS c� X- C �% ( �rt�cc.�,� � ` Spacing exception req'd: Yes ❑ No Inclination -only svy req'd: Yes ❑ No [� n , p Post initial injection MIT req'd: Yes ❑ No ❑ A��^z.c e -t 2-c Ari `Z5 . e7 r, �r CC) C f)C.A) 7 APPROVED BY ) C Approved by:%- —'— ��(� COMMISSIONER THE COMMISSION Date: � submit Form and Form 10 4 1 Revised 5/2017 This permit is v lid for 24 o t s r t f pt7l per 20 AAC 25. 5 ttachment iit Duplicate Hilcorp Alaska, LLC GP 55RD Drilling Program Granite Point ro d by: My Revision 0 July 16, 2019 GP 55RD Drilling Procedure Rev 0 I ilrnrp Alaska. LLA. Contents 1.0 Well Summary.................................................................................................................................2 2.0 Management of Change Information............................................................................................3 3.0 Tubular Program............................................................................................................................4 4.0 Drill Pipe Information.....................................................................................................................4 5.0 Internal Reporting Requirements..................................................................................................5 6.0 Planned Wellbore Schematic..........................................................................................................6 7.0 Drilling Summary............................................................................................................................7 8.0 Mandatory Regulatory Compliance / Notifications .....................................................................8 9.0 R/U and Preparatory Work..........................................................................................................10 10.0 BOP N/U and Test.........................................................................................................................11 11.0 Mud Program and Density Selection Criteria............................................................................12 12.0 Drill 8-3/8" Hole Section...............................................................................................................13 13.0 Run 7" Drilling Liner....................................................................................................................15 14.0 Cement 7" Drilling Liner..............................................................................................................18 15.0 Drill 6-1/8" Hole Section...............................................................................................................22 16.0 Run 5" Production Liner..............................................................................................................25 17.0 Cement 5" Production Casing......................................................................................................28 18.0 Wellbore Clean Up & Displacement............................................................................................32 19.0 Run Completion Assembly...........................................................................................................33 20.0 RD...................................................................................................................................................33 21.0 BOP Schematic..............................................................................................................................34 22.0 Wellhead Schematic......................................................................................................................35 23.0 Days vs Depth.................................................................................................................................36 24.0 Geo-Prog.........................................................................................................................................37 25.0 Anticipated Drilling Hazards.......................................................................................................38 26.0 Rig Layout......................................................................................................................................39 27.0 FIT Procedure................................................................................................................................42 28.0 Choke Manifold Schematic...........................................................................................................43 29.0 Casing Design Information...........................................................................................................45 30.0 8-3/8" Hole Section MASP............................................................................................................46 31.0 6-1/8" Hole Section MASP............................................................................................................47 32.0 Plot (NAD 27) (Governmental Sections)......................................................................................48 33.0 Slot Diagram (As Built) (NAD 27)...............................................................................................49 34.0 Directional Program(wp08).........................................................................................................51 GP 55RD Drilling Procedure Rev 0 llily—p .Alaska, LLC 1.0 Well Summary Well GP 55RD Pad & Old Well Designation Sidetrack of existing well GP55 (PTD#197-145) ' Planned Completion Tye 5" 18# P-110 Liner, 2-7/8" X 2-3/8" Tubing GL Com Target Reservoir(s) T onek Producer C7 Planned Well TD, MD / TVD 15,086' MD / 10,332' TVD PBTD, MD / TVD 15,028' MD / 10,325' TVD Surface Location (Governmental) 2437' FSL, 1303' FWL, Sec 13, T10N, R12W, SM, AK ' Surface Location (NAD 27) X=263339.45, Y=2544494.92 1 Surface Location (NAD 83) Top of Productive Horizon (Governmental) 375' FSL, 1071' FEL, Sec 14, T10N, R12W, SM, AK TPH Location (NAD 27) X=260913.2, Y=2542075.82 TPH Location (NAD 83) BHL (Governmental) 1504' FSL, 2532' FWL, Sec 23, T10N, R12W, SM, AK BHL (NAD 27) X=259154.0, Y=2537960.0 BHL (NAD 83) AFE Number 1911669D AFE Drilling Days AFE Drilling Amount $5.9 MM Work String 5" 19.5# 5-135 NC50 (Rental from Workstrings Int'l) RKB — AMSL 132' MSL to ML 83' BOP Equipment 13-5/8" 5M Shaffer Annular BOP 13-5/8" IOM Cameron Type U Double Ram 13-5/8" l OM Cameron Type U Single Ram Page 2 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 11H rp ;kla,ka. LLC 2.0 Management of Change Information Hilcorp Alaska, LLC Changes to Approved Permit to Drill Date: 7.14.2019 Subject: Changes to Approved Permit to Drill for GP-55RD File #: GP 55 -RD Drilling and Completion Program Any modifications to GP-55RD Drilling & Completion Program will be documented and approved below. Changes to an approved APD will beltwmupic-to-to the AOGC„�,prior being implemented. ���d3i -C L'c-� � _ i- .J i i/._1':.i Hilcorp F- W' C—P-r .- - - - -- -- -JAT, ('- Sec Page Date Procedure Change Approved Approved By B Approval: Monty M Myers 7.14.2019 Drilling Manager Prepared: Drilling Engineer Date Date Page 3 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Hileorp Alaska. LLC 3.0 Tubular Program Hole OD (in) Wt (#/ft) Coup] OD ID (in) Drift (in) Grade Conn Top Bottom Section 8-3/8" 7" 29 7.875" 6.184 6.125 L-80 DWC/C 4,814 9,500' 6-1/8" 5" 18 5.0" 4.194 4.151 P-1 101C I YD513 9.300' 15.086' 4.0 Drill Pipe Information Hole 0 (in) TJ ID TJ ODW a . Y Burst Collapse Tension Section (in), in #/ft .. (psi) (psi) k -lbs 8-3/8" 5" 4.276 3-1/8 6-5/8 19.5 S-135 NC50 17,100 15,110 560 6-1/8" 4-1/2" 3.826 2.6875" 5.25" 16.6 S-135 CDS40 17,693 16,769 468k All casing will be new, PSL 1 (100% mill inspected, 10% inspection upon delivery to TSA in Fairbanks). Page 4 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 llilcorp Alaska, LLC 5.0 Internal Reporting Requirements 5.1 Fill out daily drilling report and cost report on Wellez. i. Report covers operations from 6am to 6am ii. Click on one of the tabs at the top to save data entered. If you click on one of the tabs to the left of the data entry area — this will not save the data entered, and will navigate to another data entry tab. iii. Ensure time entry adds up to 24 hours total. iv. Try to capture any out of scope work as NPT. This helps later on when we pull end of well reports. 5.2 Afternoon Updates v. Submit a short operations update each work day to pmazzolinighilcorp.com, mmyers@hilcorp.com and cdingerghilcorp.com 5.3 5am Weekend Update vi. Submit a short operations update each weekend and holiday to whoever is assigned weekend or vacation duty. Details will be sent before each weekend or holiday. vii. Copy pmazzolining.hilcorp.com, and mmyers@hilcorp.com 5.4 EHS Incident Reporting viii. Notify EHS field coordinator. 1. This could be one of (3) individuals as they rotate around. Know who your EHS field coordinator is at all times, don't wait until an emergency to have to call around and figure it out!!!! a. Leonard Dickerson: O: (907) 777-8317 C: (907) 252-7855 b. Mark Tornai: O: (907) 283-1372 C: (907) 748-3299 c. Thad Eby: O: (907) 777-8317 C: (907) 602-5178 2. Spills: a. Keegan Fleming: 0:907-777-8347 C:907-350-9439 ix. Notify Drlg Manager 1. Paul Mazzolini: O: 907-777-8369 C: 907-317-1275 x. Submit Hilcorp Incident report to contacts above within 24 hrs 5.5 Casing Tally xi. Send final "As -Run" Casing tally to mmyers(2hilcorp.com and cdin er o,hilcorp.com 5.6 Casing and Cmt report xii. Send casing and cement report for each string of casing to mmrsskhilcorp.com and cdin er e,hilcorp.com Page 5 Revision 0 July, 2019 Granite Point Field Well Name: GP -55 11 SCHEMATIC Completion Date: 8/26/1997 PTD: 197-145 Iiilvol IP khak, . I I!, API. 50-733-20479-00 9 Y � ih J r .os n ego t - � ` a� .•' 9518"@ J "4l~ �s,f Ffi� PBTD = 4,864'ivD (4,OOT TVD) TD = 5,011'IVD (4,100' TVD) Directional Data: max hole angle = 51.30 @ 4,667' Size Type WV Grade Top Btm CONN ID Cement/Other 33" Conductor Surf 229' Driven 26" Conductor Surf 306' Driven 299bbl 12.9ppg 13-3/8" Surface 68#, K-55 Surf 1,318' BTC 12.415" lead, 49.3bbl 15.8ppg tail 53.5#, P- 458bbi 12.9ppg 9-5/8" Production 110 Surf 4,997' BTC 8.535" lead, 37bbl 15.8ppg tail S' �"A/Lf '0J Updated by JLL 07/17/2019 GP 55RD Drilling Procedure Rev 0 Ifilcorp Alaska, LLC 6.0 Planned Wellbore Schematic --------------------------------------------------------------------------------------, PROPOSED Granite Point Field Weil: GP SSR] JEWELRY DETAIL Last Completed: Future Size PTO: )(YX-X)C% Lti1.,w n .11�•>L„- I.I.s. API. 50-733 ��74 .'UC RIS=13Z Btm SA - 5 wx ±I -q c60' WL} Ta. 15'Cr3V Nu , ------ ------------------------------------------------------------------------------- --------------------------------------------------------------------------------------, Zone TOP Btm (MD) (MD) CASING DETAIL JEWELRY DETAIL No Size Wt Gtd& Conn ID ?op Btm 26" 2.313" ctoductur Surf 306' 13-3Ar 66 K -SS HTC 12415 Surf 1X9 9.568" 53S P•110 HTC 8.535 Surf 4,997 7' 26 L -BO MkVC 6-276" !4,SW 9,500' 5" 1 18 P-110 fF dril5ll 1 4.276" 39,3047 I 15,085' 5;000' 2.4-.' GLM 16 TUBING DETAIL ±6,602' 5,500' 2-7/9' 6.S L-80 I RLrAWE 2441" Surf 1 +±9,2-70' 2-3/a 4.7 5,500' 1 L-80 I SMdEUE I 1995" I t9.20Tr I 312050" i3ro) --------- --------------------------------------------------------------------------------------, Zone TOP Btm (MD) (MD) TOP HUn;TWj FT Delia Status MD) JEWELRY DETAIL No Depth Dept(TM ID 00 Item 1 t359 3350' 2.313" SSSV ±2,008' ±2,000' 2.441" GLM 11 33,286' ±3,000' 2.441" GLM 12 34,060' _3500' 2.441" GLM 13 ±4,854' ±Q,W7' 2.441" GLM 14 ±5,545' 34,500' 2441" GLM 15 2 ±607 5;000' 2.4-.' GLM 16 ±6,602' 5,500' 2.441'" GUd 17 ±7,116" ±6,000' 2.441" GLM 19 17,631' 5,500' 2.441' GLM 19 ±$145' ±7,000' 2.441" GLM 110 ±6,659' ±7,SW 2.441" GLM 111 ±9,174' 38,[00' 2.441" GLM 112 3 ±9,2410' S,D26' 1.9915' X-Outr ±%fi ' 38,500' 1.995" GLM 113 4 ±10,21S' x,003 1.995` GLM 114 ±1470Cr 39,390' 1.995" GLM 115 S ±10,730' 5,411' 1.475" 3.66%3' Ilalliburtat ROC Gauge Martdrei 0.2S`TEC ,, ;, 6 ±M760' 19,431' Packer 9310,750 5,451' 1.7'91" XN-MP 10 ±10800 x,457' WLEG ,•y w;— Page 6 Revision 0 July, 2019 PERFORATION DETAIL Zone TOP Btm (MD) (MD) TOP HUn;TWj FT Delia Status MD) C-7 . t10,900' ±14,500' ±9,521' ±iD,249 12500' future Prapated Page 6 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Ilileurp Alaska, I.M. 7.0 Drilling Summary GP 55RD is an oil production well planned to: be -duelled in a South-westerly direction from the existing GP 55 utilizing the existing casing program do to 5,014' 14D / 4,115' TVD. -151-1 e, .501 q `K� At 5,014' MD the parent wellbore shoe will be drilled out and new wellbore drilled to 9,500' TMD. An intermediate 7" liner will be run and cemented at 9,500'. A 5,586' x 6-1/8" open hole section is planned to be drilled to TD of 15,086' A 5" 18# P-11OIC HYD513 prod liner will be run, cemented, and perforated based on data obtained while drilling the interval. The well will be completed with a 2-7/8" X 2-3/8" gas lift completion. Drilling operations are expected to commence approximately August 7"', 2019. All waste & mud generated during drilling and completion operations will be hauled to the Kenai Gas Field G&I facility for disposal / beneficial reuse depending on test results. General sequence of operations pertaining to this approved drilling procedure: 1. Spartan 151 will be skid over (GP 55). 2. NU BOPE and test. 3. RIH with clean out assembly and swap well to 9.0 ppg oil based drilling mud 4. Drill shoe 20' of new formation at 5,014'. 5. Perform FIT to 13 ppg EMW 6. POOH and LD cleanout assembly. PU rotary steerable directional BHA and TIH to shoe. 7. Drill intermediate hole from 5,014' to 9,500' MD, performing short trips as needed 8. POOH w/ directional tools. RIH w/ 7" liner. Set liner and cement. Circ wellbore clean. 9. POOH, laying down DP and liner running tools, 10. PU 6-1/8" rotary steerable drilling assembly and TIH to landing collar. 11. Drill out float equipment and 20' of new formation at 9,500'. 12. Perform FIT to 13 ppg EMW . 13. Drill production hole from 9,500' to 15,086' MD, performing short trips as needed 14. POOH w/ directional tools. RIH w/ 5" liner. Set liner and cement. Circ wellbore clean. 15. PU liner cleanout assembly and TIE to landing collar. 16. Circ casing clean. POOH laying down DP 17. Skid to GP52 Page 7 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Hilcorp Alaska, LLC 8.0 Mandatory Regulatory Compliance / Notifications Regulatory Compliance Ensure that our drilling and completion operations comply with the below AOGCC regulations. If additional clarity or guidance is required on how to comply with a specific regulation, do not hesitate to contact the Anchorage Drilling Team. • BOPs shall be tested at (2) week intervals during the drilling of GP 55RD. Ensure to provide AOGCC 48 hrs notice prior to testing BOPS. • The initial test of BOP equipment will be to 250/3500 psi & subsequent tests of the BOP equipment will be to 250/3500 psi for 5/5 min (annular to 50% rated WP, 2500 psi on the high test for initial and subsequent tests). Confirm that these test pressures match those specified on the APD. • If the BOP is used to shut in on the well in a well control situation, we must test ALL BOP components utilized for well control prior to the next trip into the wellbore. This pressure test will be charted same as the 14 day BOP test. • All AOGCC regulations within 20 AAC 25.033 "Primary well control for drilling: drilling fluid program and drilling fluid system" • All AOGCC regulations within 20 AAC 25.035 "Secondary well control for primary drilling and completion: blowout prevention equipment and diverter requirements" • Ensure AOGCC approved drilling permit is posted on the rig floor and in Co Man office. Variance Requests: o Hilcorp would like to request a variance to regulation 20 AAC 25.035(e)(4)(F)(i) which states - "the outlets must be at least two inches in nominal diameter, except that for rotary drilling rig operations, if the operation has a maximum potential surface pressure of greater than 3,000 psi, the nominal diameter of the choke outlets must be at least three inches". ,/ o The calculated MASP for this wellbore when completely evacuated to gas is 3513 psi. However, for Cook Inlet Operations, we assume that the well can never flow 100% gas, du�the water in the reservoir. We reduce this MASP calculation to 2342 psi which assumes that only 2/3 of the �-- wellbore is evacuated to gas and 1/3 to 8.4 ppg reservoir fluid. o Hilcorp would like to request to have 2-1/16" outlets on the choke line and kill line due to this assumption Page 8 Revision 0 July, 2019 llilcorp Alaska, LLC Summary of BOP Equipment and Test Requirements GP 55RD Drilling Procedure Rev 0 Hole Section Equipment Test Pressure(psi) • 13-5/8" Shaffer 5M annular 8-3/8" • 13-5/8" l OM Cameron U Double gate • Blind ram in bottom cavity Initial Test: 250/3500 (Annular 2500 psi) & • Mud cross 6-1/8" • 13-5/8" 1 O Cameron U single gate • 3-1/16" 5M Choke Manifold Subsequent Tests: 250/3500 • Standpipe, floor valves, etc (Annular 2500 psi) Primary closing unit: Masco 7 station, 15 bottle, 3000 psi closing unit with two air pumps, a triplex electric driven pump Required AOGCC Notifications: • Well control event (BOPS utilized to shut in the well to control influx of formation fluids). • 48 hours notice prior to spud. • 48 hours notice prior to testing BOPS. • 48 hours notice prior to casing running & cement operations. • Any other notifications required in APD. Additional requirements may be stipulated on APD. Regulatory Contact Information: AOGCC Jim Regg / AOGCC Inspector / (0): 907-793-1236 / Email: jim.regggalaska.gov Guy Schwartz / Petroleum Engineer / (0): 907-793-1226 / (C): 907-301-4533 / Email: guy.schwartz(g,alaska.gov Victoria Loepp / Petroleum Engineer / (0): 907-793-1247 / Email: victoria.loeppga,alaska.gov Primary Contact for Opportunity to witness: AOGCC.Inspectors(2alaska.gov Test/Inspection notification standardization format: http:Hdoa.alaska.gov/ogc/forms/TestWitnessNotifhtml Notification / Emergency Phone: 907-793-1236 (During normal Business Hours) Notification / Emergency Phone: 907-659-2714 (Outside normal Business Hours) Page 9 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Ililcorp Alaska, 111: 9.0 R/U and Preparatory Work t,1�4,G (�f 5-5-- 9.1 SSS 9.1 Mix mud for 8-3/8" hole section. rl � Gs� is- -fe-s 9.2 Verify 6.5" liners installed in mud pump #1 and pump #2. (PZ -10's) • Gardner Denver PZ -10's Pumps are rated at 4200 psi (100%) with 6.5" liners and can deliver 496 gpm at 115 spm. • Ideal pump rate for drilling will be 500-600 gpm. Both pumps running at 65 spm should achieve this. PISTON CYLINDER DISPLACEMENT— DRILLING SERVICE MAXIMUM PSI DIAMETER PER REVOLUTION I MAXIMUM FLOW RATE 7 178 5.00 18.92 575 6.5 165 4.31 16.31 496 6.25 159 3.98 15.08 458 6 152 3.67 13.90 422 5.5 140 3.09 11.68 355 5 127 2.55 9.65 293 Weight Complete pump with large steel skid - 41,400 pounds. Ratings are based on 90% mechanical efficiency and 100% volumetric efficiency. 2176 3623 250 1876 4202 290 1734 4545 313 1598 4932 340 1343 5000 345 1110 5000 345 PUMP IJACKSHAFT RPM RPM Page 10 Revision 0 July, 2019 504 GP 55RD Drilling Procedure Rev 0 Irileorp Alaska, UX 10.0 BOP N/U and Test 10.1 N/U 13-5/8"x 5M BOP as follows (top down): • 13-5/8" x 5M Shaffer annular BOP. • 13-5/8" Cameron Type "U" Double ram. (2-7/8" X 5" VBR in top cavity, blind ram in btm cavity) • 13-5/8" mud cross • 13-5/8" Cameron Type "U" single ram. (2-7/8" X 5" VBR) • N/U pitcher nipple, install flowline. • Install (2) manual valves on kill side of mud cross. Manual valve used as inside or "master valve". • Install (1) manual valve on choke side of mud cross. Install an HCR outside of the manual valve. 01 Y11- 10.2 Run BOP test assy, land out est plug (if not installed previously). 7 .- Ak�C e �o 40;6c- Test ��-C • Test BOP to 250/ psi for 5/5 min. Test annular to 250/2500 psi for 5/5 min. • Ensure to leave "A" section side outlet valves open during BOP testing so pressure does not build up beneath the test plug. Confirm the correct valves are opened!!! • Test VBRs on 5" test joint. • Ensure gas monitors are calibrated and tested in conjunction w/ BOPE. 10.3 R/D BOP test assy. 10.4 Continue mixing mud for 8-3/8" hole section. 10.5 Set wearbushing in wellhead. Ensure ID of wearbushing > 8-3/8". Page 11 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Ililcorp Alaska, GLC 11.0 Mud Program and Density Selection Criteria 11.1 8-3/8" Production hole mud program summary: Primary weighting material to be used for the hole section will be barite to minimize solids. We will have enough barite on location to weight up the active system 1ppg above highest anticipated MW in the event of a well control situation. Canrig PVT will be used throughout the drilling and completion phase. Remote monitoring stations will be available at the driller's console, Co Man office, Toolpusher office, and mud loggers office. System Type: 9.0 ppg 80/20 Enviromul MOBM Properties: System Formulation: 80/20 Enviromul MOBM Product Mud Weight LVT 0.662 bbl Water .172 bbl INVERMUL NT 4 ppb MD (Prig) Viscosity PV YP HTHP WPS ES 5,014-9,500' 9.0-9.5 • 50-80 25-35 15-22 <5 250-270K >580 System Formulation: 80/20 Enviromul MOBM Product Concentration LVT 0.662 bbl Water .172 bbl INVERMUL NT 4 ppb EZ MUL NT 4 ppb GELTONE V 6-10 ppb Lime 7 ppb DURATONE HT 2 ppb Calcium Chloride 21 ppb BAROID 41 9.0 ppg (as needed) BARACARB 5 3-5 ppb BARABLOK 2 ppb BAROTROLPLUS 4 ppb 11.2 Program mud weights are generated by reviewing data from producing & shut in offset wells, estimated BHP's from formations capable of producing fluids or gas and formations which could require mud weights for hole stabilization. 11.3 A guiding philosophy will be that it is less risky to weight up a lower weight mud than be overbalanced and have the challenge to mitigate lost circulation while drilling ahead.` Page 12 Revision 0 July, 2019 0 Hileorp Alaska, LLC. 12.0 Drill 8-3/8" Hole Section 12.1 PX 8-3/8" rotary steerable directional drilling assy. 12.2 Ensure BHA Components have been inspected previously. GP 55RD Drilling Procedure Rev 0 12.3 Drift & caliper all components before M/U. Visually verify no debris inside components that cannot be drifted. 12.4 Ensure TF offset is measured accurately and entered correctly into the MWD software. 12.5 Confirm that the bit is dressed with a TFA of 0.51 — 0.61 sqin. Have DD run hydraulics models to ensure optimum TFA. We want to pump at 500-600gpm. 12.6 Must keep up with 5 deg/100 DLS in the build section of the wellbore. 12.7 Primary bit will be the Baker Hughes 8-3/8" Kymera Hybrid bit. Ensure to have a back up bit 11)" available on location. 2 . OI 12.8 TIH to cement plug from prior slot recovery/P&A. Shallow test MWD on trip in. 12.9 Tag cement and drill 20' of new formation from 5,014' to below 9-5/8" shoe. 12.10 Conduct FIT to 13.0 ppg EMW. D , � I *4- I �Q-�Q r. Aon'" cc 12.11 (13.0 — 9.0) * 0.052 * 4115' tvd = 856 psi 12.12 Kick Tolerance • (13.0 -9.0) * (4115/10332) = 1.6 Note: Offset field test data predicts frac gradients at the window to be between 12 ppg and 1 S ppg. A 13.0 ppg FIT results in a 1.74 ppg kick tolerance while drilling the interval with a 9.0 ppg fluid density. 12.13 Drill 8-3/8" hole to 9,500' MD using rotary steerable assembly. • Pump sweeps and maintain mud rheology to ensure effective hole cleaning. • Utilize Inlet experience to drill through coal seams efficiently. Coal seam log will be provided by Hilcorp Geo team, try to avoid sliding through coal seams. Work through coal seams once drilled. • Keep swab and surge pressures low when tripping. • See attached mud program for hole cleaning and LCM strategies. • Ensure solids control equipment functioning properly and utilized to keep LGS to a minimum without excessive dilution. • Adjust MW as necessary to maintain hole stability. • Ensure mud engineer set up to perform HTHP fluid loss. Page 13 Revision 0 July, 2019 Ililcorp Alaska, LLC • Maintain API fluid loss < 6. • Take MWD surveys every stand drilled. • Minimize backreaming when working tight hole GP 55RD Drilling Procedure Rev 0 12.14 Hilcorp Geologists will follow mud log closely to determine exact TD. 12.15 At TD pump a sweep and a marker to be used as a fluid caliper to determine annulus volume for cement calculations. CBU, and pull a wiper trip back to the window. 12.16 TOH with drilling assembly, handle BHA as appropriate. Page 14 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Ililcorp Alaska, LLC 13.0 Run 7" Drilling Liner 13.1 R/U Weatherford 7" casing running equipment. • Ensure 7" DWC/C x 5" NC50 crossover on rig floor and M/U to FOSV. • R/U fill up line to fill casing while running. • Ensure all casing has been drifted and tally verified prior to running. • Be sure to count the total # of joints before running. • Keep hole covered while R/U casing tools. • Record OD's, ID's, lengths, S/N's of all components w/ vendor & model info. s C, k.a v. V V? Pew T-6---5 `fib -7 13.2 P/U shoe joint, visually verify no debris inside joint. 13.3 Continue M/U & thread locking shoe track assy consisting of: • (1) Shoe joint w/ shoe bucked on & threadlocked (coupling also thread locked). • (1) Baker locked joint. • (1) Joint with float collar bucked on pin end & threadlocked (coupling also thread locked). • (1) Joint with landing collar bucked up. • No centralizers to be installed on shoe joint, FC joint, and LC joint. • Install centralizers, one per joint to +/- 5,000' TMD, and leave centralizers free floating so that they can slide up and down the joint. • Ensure proper operation of float shoe & FC. 13.4 Continue running 7" production liner • Fill casing while running using fill up line on rig floor. • Use "API Modified" thread compound. Dope pin end only w/ paint brush. • Utilize a collar clamp until weight is sufficient to keep slips set properly. 7" DWC/C M/U torques Casing OD Minimum Maximum Yield Torque 7" 19,200 ft -lbs 22,100 ft -lbs 1 25,000 ft -lbs Page 15 Revision 0 July, 2019 Ilileorp :Alaska. 111: Connection Type: Size(O.D.): DWC/C Casing 7 in 2012 API Spec 5CT Coupling O.D. Material L-80 Grade 80,000 Minimum Yield Strength (psi) 95,000 Minimum Ultimate Strength (psi) Pipe Dimensions 7.000 Nominal Pipe Body O.D. (in) 6.184 Nominal Pipe Body I.D.(in) 0.408 Nominal Wall Thickness (in) 29.00 Nominal Weight (lbs/ft) 28.75 Plain End Weight (lbs/ft) 8.449 Nominal Pipe Body Area (sq in) GP 55RD Drilling Procedure Rev 0 Weight (Wall): Grade: 29.00 Ib/ft (0.408 in) L-80 Pipe Body Performance Properties 676,000 Minimum Pipe Body Yield Strength (lbs) 7,030 Minimum Collapse Pressure (psi) 8,160 Minimum Internal Yield Pressure (psi) 7,500 Hydrostatic Test Pressure (psi) GP 55RD Drilling Procedure Rev 0 Weight (Wall): Grade: 29.00 Ib/ft (0.408 in) L-80 Connection Dimensions 7.875 Connection O.D. (in) 6.184 Connection I.D. (in) 6.125 Connection Drift Diameter (in) 4.50 Make-up Loss (in) 8.449 Critical Area (sq in) 100.0 Joint Efficiency (%) GP 55RD Drilling Procedure Rev 0 Weight (Wall): Grade: 29.00 Ib/ft (0.408 in) L-80 Appoximated Field End Torque Values 19,200 Minimum Final Torque (ft -lbs) 22,100 Maximum Final Torque (ft -lbs) 25,000 Connection Yield Torque (ft -lbs) VAM USA 4424 W Sam Houston Pkwy. Suite 150 Houston, TX 77041 Phone: 713-479.3200 Fax: 713-479-3234 E-mail: VAMUSAsales�am-usa.com Page 16 Revision 0 July, 2019 Connection Performance Properties 676,000 Joint Strength (lbs) 16,650 Reference String Length (ft) 1.4 Design Factor 718,000 API Joint Strength (lbs) 338,000 Compression Rating (lbs) 7,030 API Collapse Pressure Rating (psi) 8,160 API Intemal Pressure Resistance (psi) 26.2 Maximum Uniaxial Bend Rating [degrees/100 ft] Appoximated Field End Torque Values 19,200 Minimum Final Torque (ft -lbs) 22,100 Maximum Final Torque (ft -lbs) 25,000 Connection Yield Torque (ft -lbs) VAM USA 4424 W Sam Houston Pkwy. Suite 150 Houston, TX 77041 Phone: 713-479.3200 Fax: 713-479-3234 E-mail: VAMUSAsales�am-usa.com Page 16 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Rilcorp Alaska, TIC 13.5 Ensure to run enough liner to provide for approx 200' overlap inside 9-5/8" casing. Ensure hanger/pkr will not be set in a 9-5/8" connection. 13.6 Before picking up Baker SDD liner hanger / packer assy, count the # of joints on the pipe deck to make sure it coincides with the pipe tally. 13.7 M/U Baker SDD liner top packer. Fill liner tieback sleeve with "Xanplex", ensure mixture is thin enough to travel past the HRD tool and down to the packoff. Wait 30 min for mixture to set UP. 13.8 RIH one stand and circulate a minimum of one liner volume. Note weight of liner. 13.9 RIH w/ liner on DP no faster than 1 min / stand. Watch displacement carefully and avoid surging the hole. Slow down running speed if necessary. 13.10 M/U top drive and fill pipe while lowering string every 10 stands. 13.11 Set slowly in and pull slowly out of slips. 13.12 Circulate 1-1/2 drill pipe and liner volume at 9-5/8" shoe prior to going into open hole. Stage pumps up slowly and monitor for losses. Do not exceed 60% of the nominal liner hanger setting pressure. 13.13 Obtain up and down weights of the liner before entering open hole. Record rotating torque at 10, 20, & 30 rpm. 13.14 Continue to fill the string every 10 joints while running liner in open hole. Do not stop to fill casing. 13.15 P/U the cmt stand and tag bottom with the liner shoe. P/U 2' off bottom. Note slack -off and pick-up weights. Record rotating torque values at 10, 20, & 30 rpm. 13.16 Stage pump rates up slowly to circulating rate without exceeding 60% of the liner hanger setting pressure. Circ and condition mud with the liner on bottom. Reduce the low end rheology of the drilling fluid by adding water and thinners. 13.17 Reciprocate & rotate string if hole conditions allow. Circ until hole and mud is in good condition for cementing. Page 17 Revision 0 July, 2019 ff rrileorp Alaska, 11C 14.0 Cement 7" Drilling Liner 14.1 Hold a pre job safety meeting over the upcoming cmt operations. GP 55RD Drilling Procedure Rev 0 14.2 Attempt to reciprocate the casing during cmt operations until hole gets sticky. 14.3 Pump 15 bbls of water through cement lines to flush them 14.4 Pump 35 bbls 12.5 ppg spacer. 14.5 Test surface cmt lines to 4500 psi. 14.6 Mix and pump 141 bbls of 14.5 ppg class "G" cmt per below recipe with 0.251b/bbl loss circulation fiber. Ensure cmt is pumped at designed weight. Job is designed to pump 50% OH excess but if fluid caliper dictates otherwise we may increase excess volumes. Cement volume is designed to bring cement up to 5,014' TMD. 14.7 Displacement fluid will be drilling mud. Cement Calculations 8-3/8" OH x 7" Liner: (9,500'— 5,014') x 0.02054 x 1.5 = 138 bbls Shoe Track: 80' x 0.03715 = 3 bbls Total Volume (bbls): 138 + 3 = 141 bbls Total Volume (ft3): 141 bbls x 5.615 ft3/bbl = 792 ft3 Total Volume (sx): 792 ft3 / 1.34 ft3/sk = 591 sx Page 18 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Ilileorp Alaska, LLC Slurry Information: System VariCEM Density 14.5 lb/gal Yield 1.34 ft3/sk Mixed Water 5.879 gal/sk Mixed Fluid 5.879 gal/sk Expected Thickening 70 Bc at 05:00 hr:mn API Fluid Loss <25 mL in 30.0 min at 155degF / 1000 psi Additives Code Description Concentration G D046 D202 D400 D154 Cement Anti Foam Dispersant Gas Control Agent Extender 94 lb/sk 0.2% BWOC 1.5% BWOC 0.8% BWOC 8.0% BWOC 14.8 Drop DP dart and displace with drilling mud. 14.9 Pump cement at max rate of 4 bbl/min. Reduce pump rate to 3 bpm prior to latching DP dart into liner wiper plug. Note plug departure from liner hanger running tool and resume pumping at full displacement rate. Displacement volume can be re -zeroed at this point 14.10 If elevated displacement pressures are encountered; position liner at setting depth and cease reciprocation. Monitor returns & pressure closely while circulating. Notify Drilling Foreman immediately of any changes. Reduce pump rate as required to avoid packoff. 14.11 Bump the plug and pressure up as required by Baker procedure to set the liner hanger (15% above nominal setting pressure. Hold pressure for 3-5 minutes. 14.12 Slack off total liner weight plus 30k to confirm hanger is set. 14.13 Do not overdisplace by more than 1/2 shoe track (-1 bbls). Shoe track volume is 3 bbls. 14.14 Pressure up to 4200 psi to release the running tool (HRD-E) from the liner Page 19 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Hilcorp Alaska, TIC 14.15 Bleed pressure to zero to check float equipment. 14.16 P/U, verify setting tool is released, and expose setting dogs on top of tieback sleeve 14.17 Rotate slowly and slack off 50k downhole to set ZXP. 14.18 Pressure up drill pipe to 500 psi and pick up to remove the RS packoff bushing from the RS profile. Bump up pressure as req'd to maintain 500 psi DP pressure while moving pipe until the pressure drops rapidly, indicating pack -off is above the sealing area (ensure that 500 psi will be enough to overcome hydrostatic differential at liner top). 14.19 Immediately with the loss of pressure and before DP reaches zero, initiate circulation while picking up to position the bottom of the stinger inside the tieback sleeve. Increase pump rate to wellbore clean up rate until the sleeve area is thoroughly cleaned. 14.20 Pick up to the high -rate circulation point above the tieback extension, mark the pipe for reciprocation, do not re -tag the liner top, and circulate the well clean. 14.21 Watch for cement returns and record the estimated volume. Rotate & circulate to clear cmt from DP. 14.22 POOH, LDDP. Verify the liner top packer received the required setting force by inspecting the rotating dog sub. Backup release from liner hanger: 14.23 If the HRD-E tool still does not release hydraulically, left-hand (counterclockwise) torque will have to be applied to the tool. This torque acts to shear brass screws. Bleed off pump pressure and ensure that the tool is in the neutral position. Apply left-hand torque as required to shear screws. 14.24 NOTE: Some hole conditions may require movement of the drillpipe to "work" the torque down to the setting tool. 14.25 After screws have sheared, the top sub and body of the setting tool will turn 1/4 turn. Then proceed slacking off set -down weight to shear second set of shear screws. The top sub will drop 1-3/4 inches. At this point, the bottom sub no longer supports the collet fingers. Pick straight up with workstring to release collet from the profile. Page 20 Revision 0 July, 2019 Hilcorp .Alaska, TIC GP 55RD Drilling Procedure Rev 0 Ensure to report the following on Wellez: • Pre flush type, volume (bbls) & weight (ppg) • Cement slurry type, lead or tail, volume & weight • Pump rate while mixing, bpm, note any shutdown during mixing operations with a duration • Pump rate while displacing, note whether displacement by pump truck or mud pumps, weight & type of displacing fluid • Note if casing is reciprocated or rotated during the job • Calculated volume of displacement, actual displacement volume, whether plug bumped & bump pressure, do floats hold • Percent mud returns during job, if intermittent note timing during pumping of job. Final circulating pressure • Note if pre flush or cement returns at surface & volume • Note time cement in place • Note calculated top of cement • Add any comments which would describe the success or problems during the cement job Note: Send Csg & cmt report + "As Run" liner tally to mmyers(&,,hilcorp.com Page 21 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Ililcurp Alaska, TIC 15.0 Drill 6-1/8" Hole Section 15.1 PU 5,700' of 4-1/2" CDS40 Drill pipe for drilling 6-1/8" hole section C k4 -,v--5 ,e U� e•�- rtes ` -G V �; �- 5 15.2 P/U 6-1/8" rotary steerable drilling assy. 15.3 Ensure BHA Components have been inspected previously. 15.4 Drift & caliper all components before M/U. Visually verify no debris inside components that cannot be drifted. 15.5 Ensure TF offset is measured accurately and entered correctly into the MWD software. 15.6 Have DD run hydraulics models to ensure optimum TFA. We want to pump at 250 - 450 gpm. 15.7 Production section will be drilled with AutoTrak. Must keep up with 6 deg/100 DLS in the drop section of the wellbore. 15.8 Primary bit will be the Baker Hughes Kymera 6-1/8" HP414. Ensure to have a back up PDC bit available on location. 15.9 TIH to liner hanger. Shallow test MWD on trip in. 15.10 TIH through liner hanger ensure Baker Hughes MWD service rep on rig floor during this operation. Page 22 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Ililcorp Alaska, LLC 15.11 Circulate well with 9.0 ppg MOBM to warm up mud until good 9.0 ppg in and 9.0 ppg out. -30 15.12 Test casing to 2500 psi and chart for minutes 15.13 Drill approx. 20' rat hole to accommodate the drilling assembly. Ream shoe as needed to assure there is little or no drag. After reaming, shut off pumps and rotary (if hole conditions allow) and pass through shoe checking for drag. 15.14 Circulate Bottoms Up until MVS' in = MW out. 15.15 Conduct FIT to 13.0 ppg EMW. • (13.0 — 9.0) * 0.052 * 8328' tvd = 1732 psi 15.16 Kick Tolerance • (13.0 -9.0) * (8328/10332) = 3.22 Note: Offset field test data predicts frac gradients at the window to be between 12 ppg and 15 ppg. A 13.0 ppg FIT results in a 3.39 ppg kick tolerance while drilling the interval with a 9.0 ppg fluid density. 15.17 System Type: 9.0 ppg 80/20 Enviromul mineral oil based drilling fluid. Properties: System Formulation: 90/10 Enviromul MOBM Product ud Weight LVT 0.662 bb] Water .172 bbl INVERMUL NT 4 ppb MD (PPg) Viscosity PV YP HTHP WPS ES 9,500— 15,086' 9.0— 10.0 50-80 20-30 15-22 v 250-270K >580 System Formulation: 90/10 Enviromul MOBM Product Concentration LVT 0.662 bb] Water .172 bbl INVERMUL NT 4 ppb EZ MUL NT 4 ppb GELTONE V 6-10 ppb Lime 7 ppb DURATONE HT 2 ppb Calcium Chloride 21 ppb BAROID 41 9.5 ppg (as needed) BARACARB 5 3-5 ppb BARABLOK 2 ppb BAROTROL PLUS 4 ppb Page 23 Revision 0 July, 2019 0 Ilileorp Alaska, LLC GP 55RD Drilling Procedure Rev 0 15.18 Drill 6-1/8" hole to 15,086' MD using rotary steerable assembly. • Pump sweeps and maintain mud rheology to ensure effective hole cleaning. • Utilize Inlet experience to drill through coal seams efficiently. Coal seam log will be provided by Hilcorp Geo team, try to avoid sliding through coal seams. Work through coal seams once drilled. • Keep swab and surge pressures low when tripping. • See attached mud program for hole cleaning and LCM strategies. • Ensure solids control equipment functioning properly and utilized to keep LGS to a minimum without excessive dilution. • Adjust MW as necessary to maintain hole stability. • Ensure mud engineer set up to perform HTHP fluid loss. • Maintain API fluid loss < 6. r • Take MWD surveys every stand drilled. ✓ • Minimize backreaming when working tight hole 15.19 Hilcorp Geologists will follow mud log closely to determine exact TD. 15.20 At TD pump a sweep and a marker to be used as a fluid caliper to determine annulus volume for cement calculations. CBU, and pull a wiper trip back to the window. 15.21 TOH with drilling assembly, handle BHA as appropriate. Page 24 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Ililcorp Alaska, TIC 16.0 Run 5" Production Liner 16.1 R/U Weatherford 5" casing running equipment. • Ensure 5" DWC/C x 4-1/2" CDS-40 crossover on rig floor and M/U to FOSV. • R/U fill up line to fill casing while running. • Ensure all casing has been drifted and tally verified prior to running. • Be sure to count the total # of joints before running. • Keep hole covered while R/U casing tools. • Record OD's, ID's, lengths, S/N's of all components w/ vendor & model info. 16.2 P/U shoe joint, visually verify no debris inside joint. 16.3 Continue M/U & thread locking shoe track assy consisting of: • (1) Shoe joint w/ shoe bucked on & threadlocked (coupling also thread locked). • (1) Baker locked joint. • (1) Joint with float collar bucked on pin end & threadlocked (coupling also thread locked). • (1) Joint with landing collar bucked up. • No centralizers will be run on 5" liner • Ensure proper operation of float shoe & FC. 16.4 Continue running 5" production liner to TD • Fill casing while running using fill up line on rig floor. • Use "API Modified" thread compound. Dope pin end only w/ paint brush. • Utilize a collar clamp until weight is sufficient to keep slips set properly. 5" HYD513 M/U torques Casing OD Minimum Maximum Yield Torque 5" 6500 ft -lbs 11400 ft -lbs 33000 ft -lbs Page 25 Revision 0 July, 2019 Ililcorp Alaska, 11C For the latest performance data, always visit our website: www.tenarls.com Wedge 513® GP 55RD Drilling Procedure Rev 0 . , 02101/2019 Outside Diameter 5.000 in. Min. Wall 87.5% Connection ID 4.194 in. Thickness 4.320 in (') Grade P110- - �8� � Connection OD Option REGULAR ICY Wall Thickness 0.362 in. Connection OD REGULAR COUPLING PIPE BODY Option Tension Efficiency 63.7% Joint Yield Strength 419.783 x1000 Body. White 1st Band: White Grade P1104CY' Drift API Standard 1st Band Pale 2nd Band. Pale Green Green Type Casing 2nd Band - 3rd Band: Pale 3rd Bard: - Green Extemal Pressure Capacity 4th Band. - PIPE BODY DATA GEOMETRY Nominal OD 5.000 m. Norricial Weight 18.00 lbsth Drift 4.151 in. Nominal ID 4276m Wail Thickness 0.362m. Plain End Weight 17.95 lbstft OD Tolerance API PERFORMANCE Body Yield Strength 659 x10009is Internal Yseld 15840 psi SMYS 125000 psi Collapse 14840 psi CONNECTION DATA GEOMETRY Connection OD 5.000 in. Connection ID 4.194 in. Make-up Loss 4.320 in Threads per in 3.36 Connection OD Option REGULAR PERFORMANCE Tension Efficiency 63.7% Joint Yield Strength 419.783 x1000 lnternat Pressure Capacity 15840.000 psi lbs Compression Efficiency 73.7% Compression Strength 485.683 0000 Max Allowable Bending 73.3 '2100 ft tbs Extemal Pressure Capacity 14840.000 psi MAKE-UP TORQUES ?'Cnimum 6500 ft4bs Optimum 7800 ft4bs Maximum 11400 ft4bs OPERATION LIMIT TORQUES Operawig Torque 22000 f4 -lbs Yield Torque 33000 ft -lbs Notes Page 26 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Ililcorp Alaska, LLC 16.5 Ensure to run enough liner to provide at least 100' overlap inside 7" casing. Ensure hanger/pkr will not be set in a 7" connection. 16.6 Before picking up Baker ZXP liner hanger / packer assy, count the # of joints on the pipe deck to make sure it coincides with the pipe tally. 16.7 M/U Baker ZXP liner top packer. Fill liner tieback sleeve with "XANPLEX", ensure mixture is thin enough to travel past the HRD tool and down to the packoff. Wait 30 min for mixture to set UP. 16.8 RIH one stand and circulate a minimum of one liner volume. Note weight of liner. 16.9 RIH w/ liner on DP no faster than 1 min / stand. Watch displacement carefully and avoid surging the hole. Slow down running speed if necessary. 16.10 M/U top drive and fill pipe while lowering string every 10 stands. 16.11 Set slowly in and pull slowly out of slips. 16.12 Circulate 1-1/2 drill pipe and liner volume at 7" shoe prior to going into open hole. Stage pumps up slowly and monitor for losses. Do not exceed 60% of the nominal liner hanger setting pressure. 16.13 Obtain up and down weights of the liner before entering open hole. Record rotating torque at 10, 20, & 30 rpm. 16.14 Continue to fill the string every 10 joints while running liner in open hole. Do not stop to fill casing. 16.15 P/U the cmt stand and tag bottom with the liner shoe. P/U 2' off bottom. Note slack -off and pick-up weights. Record rotating torque values at 10, 20, & 30 rpm. 16.16 Stage pump rates up slowly to circulating rate without exceeding 60% of the liner hanger setting pressure. Circ and condition mud with the liner on bottom. Reduce the low end rheology of the drilling fluid by adding water and thinners. 16.17 Reciprocate & rotate string if hole conditions allow. Circ until hole and mud is in good condition for cementing. Page 27 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 I ileorp Alaska, LIX 17.0 Cement 5" Production Casing 17.1 Hold a pre job safety meeting over the upcoming cmt operations. 1.7.2 Attempt to reciprocate the casing during cmt operations until hole gets sticky. 17.3 Pump 15 bbls 12.5 ppg spacer. 17.4 Test surface cmt lines to 4500 psi. 17.5 Pump remaining 10 bbls 12.5 ppg spacer. 17.6 Mix and pump 102 bbls of 15.3 ppg class "G" cmt per below recipe with 0.5 lbs/bbl of loss circulation fiber. Ensure cmt is pumped at designed weight. Job is designed to pump 50% OH excess but if fluid caliper dictates otherwise we may increase excess volumes. Cement volume is designed to bring cement to 9,500' TMD. 17.7 Displacement fluid will be drilling mud. —207 bbls of displacement fluid in drill pipe and 35 bbls in liner. (5in. DP(.00852 * 10183 = 87)), (4-1/2 DP (.01373*5500 =76), (5" Liner (.01776 4872 = 87)), Total 250 bbls Cement Calculations 6-1/8" OH x 5" Liner: (15086' — 9500') x 0.01216 x 1.5 = 102 bbls Shoe Track: 90' x 0.01776 = 1.6 bbls Total Volume (bbls): 102 + 1.6 = 104 bbls Total Volume (ft3): 104 bbls x 5.615 ft3/bbl = 584 ft3 Total Volume (sx): 584 ft3 / 1.34 ft3/sk = 436 sx Page 28 Revision 0 July, 2019 V/ GP 55RD Drilling Procedure Rev 0 Hilcorp Alaska, LU: Slurry Information: System ExpandaCEM Density 15.3 lb/gal Yield 1.34 ft3/sk Mixed Water 5.879 gal/sk Mixed Fluid 5.879 gal/sk Expected Thickening 70 Be at 05:00 hr:mn API Fluid Loss <25 mL in 30.0 min at 155degF / 1000 psi Additives Code Description Concentration G D046 D202 D400 D154 Cement Anti Foam Dispersant Gas Control Agent Extender 94 lb/sk 0.2% BWOC 1.5% BWOC 0.8% BWOC 8.0% BWOC 17.8 Drop DP dart and displace with 9.5 ppg OBM drilling mud. 17.9 Pump cement at max rate of 4 bbl/min. Reduce pump rate to 3 bpm prior to latching DP dart into liner wiper plug. Note plug departure from liner hanger running tool and resume pumping at full displacement rate. Displacement volume can be re -zeroed at this point 17.10 If elevated displacement pressures are encountered, position liner at setting depth and cease reciprocation. Monitor returns & pressure closely while circulating. Notify Drilling Foreman immediately of any changes. Reduce pump rate as required to avoid packoff. 17.11 Bump the plug and pressure up to up as required by Baker procedure to set the liner hanger (15% above nominal setting pressure. Hold pressure for 3-5 minutes. 17.12 Slack off total liner weight plus 30k to confirm hanger is set. 17.13 Do not overdisplace by more than %2 shoe track (-1 bbls). Shoe track volume is 1.8 bbls. 17.14 Pressure up to 4200 psi to release the running tool (HRD-E) from the liner Page 29 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Ilil,•urp Alaska, LLC 17.15 Bleed pressure to zero to check float equipment. 17.16 P/U, verify setting tool is released, and expose setting dogs on top of tieback sleeve 17.17 Rotate slowly and slack off 50k downhole to set ZXPN. 17.18 Pressure up drill pipe to 500 psi and pick up to remove the RS packoff bushing from the RS nipple. Bump up pressure as req'd to maintain 500 psi DP pressure while moving pipe until the pressure drops rapidly, indicating pack -off is above the sealing area (ensure that 500 psi will be enough to overcome hydrostatic differential at liner top). 17.19 Immediately with the loss of pressure and before DP reaches zero, initiate circulation while picking up to position the bottom of the stinger inside the tieback sleeve. Increase pump rate to wellbore clean up rate until the sleeve area is thoroughly cleaned. 17.20 Pick up to the high -rate circulation point above the tieback extension, mark the pipe for reciprocation, do not re -tag the liner top, and circulate the well clean. 17.21 Watch for cement returns and record the estimated volume. Rotate & circulate to clear cmt from DP. 17.22 POOH, LDDP. Verify the liner top packer received the required setting force by inspecting the rotating dog sub. Backup release from liner hanger: 17.23 If the HRD-E tool still does not release hydraulically, left-hand (counterclockwise) torque will have to be applied to the tool. This torque acts to shear brass screws. Bleed off pump pressure and ensure that the tool is in the neutral position. Apply left-hand torque as required to shear screws. 17.24 NOTE: Some hole conditions may require movement of the drillpipe to "work" the torque down to the setting tool. 17.25 After screws have sheared, the top sub and body of the setting tool will turn 1/4 turn. Then proceed slacking off set -down weight to shear second set of shear screws. The top sub will drop 1-3/4 inches. At this point, the bottom sub no longer supports the collet fingers. Pick straight up with workstring to release collet from the profile. Page 30 Revision 0 July, 2019 nilcorp Alaska, LLC GP 55RD Drilling Procedure Rev 0 Ensure to report the following on Wellez: • Pre flush type, volume (bbls) & weight (ppg) • Cement slurry type, lead or tail, volume & weight • Pump rate while mixing, bpm, note any shutdown during mixing operations with a duration • Pump rate while displacing, note whether displacement by pump truck or mud pumps, weight & type of displacing fluid • Note if casing is reciprocated or rotated during the job • Calculated volume of displacement, actual displacement volume, whether plug bumped & bump pressure, do floats hold • Percent mud returns during job, if intermittent note timing during pumping of job. Final circulating pressure • Note if pre flush or cement returns at surface & volume • Note time cement in place • Note calculated top of cement • Add any comments which would describe the success or problems during the cement job Note: Send Csg & cmt report + "As -Run" liner tally to mmyers(a)hilcorn.com Page 31 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 liilcorp Alaska, l.LC 18.0 Wellbore Clean Up & Displacement 18.1 M/U casing clean out assy complete with casing scraper assys for each size casing in the hole. • 4" or 4.125" bit or mill • Casing scraper & brush for 5" 18# casing • +/- 5600' 2-7/8" DP. • Casing scraper & brush for 7" 29# casing • (2000') 4-1/2" DP • Casing scraper & brush for 7" 29# casing • 4-1/2" DP to 43 00' TMD • 5" DP to surface 18.2 TIH & clean out well to landing collar (+/- 14,966' MD). • Circulate as needed on trip in if string begins to take weight. • Circulate hi -vis sweeps as necessary to carry debris out of wellbore. • Ensure 4" bit is worked down to the landing collar. • Space out the cleanout BHA so that the 4" bit reaches the 5" landing collar when crossover is +/- 30' above the 5" liner top. iL 6 18.3 After wellbore has been cleaned out satisfactorily using mud, test casing to 2500 psi / 30 min. Ensure to chart record casing test. 18.4 Displace drilling fluid in wellbore with a hi -vis pill followed by diesel. • Circulate 3 to 4 B/TJ until clean-up is satisfactory. • After a couple circulations using diesel, short trip the assy to bring the upper 7" scraper assy to surface. • RIH again & tag landing collar w/ 4" bit. Continue circulation as necessary until fluid cleans up. Make another short trip if necessary. 18.5 TOH w/ clean out assy. LDDP on the trip out. Page 32 Revision 0 July, 2019 0 Ilih-orp Alaska.. 11C 19.0 Run Completion Assembly GP 55RD Drilling Procedure Rev 0 19.1 Run 2-7/8" X 2-3/8" tubing completion assembly as per separate Approved Completion Sundry 20.0 RD 20.1 Install BPV in wellhead. RILDs. 20.2 ND BOPE, NU tree, test void 20.3 Rig Down Page 33 Revision 0 July, 2019 Ililcorp Ala.ka, LLC 21.0 BOP Schematic GP 55RD Drilling Procedure Rev 0 Rig Floor Page 34 Revision 0 July, 2019 r1 riile.orp Alaska, LLC. 22.0 Wellhead Schematic Gnn3e Pont GPP 53 and SS 133/8 x9 SA x 31/2 Vatm5wab, 31/8 SM FF EE tri' VIVe, Matter, 31185M FE EEtM Valve, Master, 31/8 SM FE EEtnn' Tubn6 head a=tTneM Cactus -TC -K 11 SM FE X 13 5/3 SM API hUl bottom U -head, XValmef SMS, 3 Sep P/IIem, 0 5/8 SM API Nub top X L33/8 BTC OfAl Bottom, w/ 2- 2" LPO, 4- 21/16 SM 550 GP 55RD Drilling Procedure Rev 0 Tab n6 hangar, Cates-TC- EN{CL, 11 x 3 31 EUE 8rd Sft and Lip, w/3" Type K6PV Pr03q 3- YAM Control Ia1e port, 6 %EN BNTA, Moven, 3 1/8 SM FEx 2.5 bower quid union top cia�d Page 35 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Hileorp Alaska, LLC 24.0 Geo-Prog C7C TOP 10,890 9,532.0 -9400 2,435,801.90 318,709.50 DATACOLLECTION REQUIREMENTS: GR + RES to top of C2 sand. Then, when appropriate, add nukes. In reservoir (C -7C), require triple combo + azimuthal resistivity Page 37 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Hilcorp .Alaska, LLC 25.0 Anticipated Drilling Hazards Lost Circulation: Ensure 500 lbs of medium/coarse fibrous material, 500 lbs SteelSeal (Angular, dual -composition carbon -based material), & 500 lbs different sizes of Calcium Carbonate are available on location to mix LCM pills at moderate product concentrations. Hole Cleaning: Maintain rheology w/ viscofier as necessary. Sweep hole w/ 20 bbls flowzan as necessary. Optimize solids control equipment to maintain density and minimize sand content. Maintain programmed mud specs. Coal Drilling: The following lessons were learned from extensive experience drilling coal seams in Cook Inlet. The need for good planning and drilling practices is also emphasized as a key component for success. • Keep the drill pipe in tension to prevent a whipping effect which can disturb coal sections. • Use asphalt -type additives to further stabilize coal seams. • Increase fluid density as required to control running coals. • Emphasize good hole cleaning through hydraulics, ROP and system rheology. • Minimize swab and surge pressures • Minimize back reaming through coals when possible H2S: j 112S is not present in this hole section. Y No abnormal temperatures or pressures are present in this hole section. Page 38 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Ililcorp Alaska, LU: 26.0 Rig Layout Page 39 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Ililcorp Alaska, 1.1.1.; {� 8N0 �D Jm 1 yaLA r� "' 0§0 Fn Sg yyz f�1�n Z NORTH S N O C� 1n % �— Uf � Oy rr//S��•J yOj Gy A �Nx m O .0 ro O s C � w z 4 p 0 O n my x m �/ ,\ N S 2 u p rOi z O� 1 m (AQ o pp NC / ) tit 2 + Oz �r _ �g Nz0- 00 mm� w T_ • s� N m �; \ N n 9E S r N Z 8 i m fit N n C O N �N Nqc . 0 GITI � S C S >A WY C 2 A S A S AAj �=zy �=z0 "m Z z �Z z m, ZC8 A �ZIC 8'nZCD6Zm�$"m � m0� fj .99 ]m OOO� OOO AC 0. A � 0. ApS m D 6 bg� rT"2rmm rT.N 2.0 r-0 �0 mg i (r .mZi D N tA�DN (AryDN ADN rA�DN7C y oA �i+t C 10 =nD0 R aib'pp d 07 A tp N Ij U Page 40 Revision 0 July, 2019 IIily—p Alaska, I.1.0 GP 55RD Drilling Procedure Rev 0 N i p N'J PO LA L CJ U AY At- - W N N W 0 0 Z I I I T I I I I / W xC I I I I / N on C / a m I I 1 1 C� o I I I w I I I I I I I I N o, 0L4 X ^l mm + + { vrc m m v azm r -z s 2�nN» « =O7C V X00 _-... Jrm-� N a O C) n N r O A!�- CO A N C-) O X S3 8Z Km D, I 1`� z I ; m 1 I 0 �# Z� a g � grII if H —N I N o 7 ON a Page 41 Revision 0 July, 2019 Hileorp Alaska, LLC. 27.0 FIT Procedure Formation Integrity Test (FIT) and Leak -Off Test (LOT) Procedures Procedure for FIT: GP 55RD Drilling Procedure Rev 0 1. Drill 20' of new formation below the casing shoe (this does not include rat hole below the shoe). 2. Circulate the hole to establish a uniform mud density throughout the system. P/U into the shoe. 3. Close the blowout preventer (ram or annular). 4. Pump down the drill stem at 1/4 to 1/2 bpm. 5. On a graph with the recent casing test already shown, plot the fluid pumped (volume or strokes) vs. drill pipe pressure until appropriate surface pressure is achieved for FIT at shoe. 6. Shut down at required surface pressure. Hold for a minimum 10 minutes or until the pressure stabilizes. Record time vs. pressure in 1 -minute intervals. 7. Bleed the pressure off and record the fluid volume recovered. The pre -determined surface pressure for each formation integrity test is based on achieving an EMW at least 1.0 ppg higher than the estimated reservoir pressure, and allowing for an appropriate amount of kick tolerance in case well control measures are required. Where required, the LOT is performed in the same fashion as the formation integrity test. Instead of stopping at a pre -determined point, surface pressure is increased until the formation begins to take fluid; at this point the pressure will continue to rise, but at a slower rate. The system is shut in and pressure monitored as with an FIT. Page 42 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 11ilearp Alaska. LLC 28.0 Choke Manifold Schematic CEMENT STAND PIPE STANDPIPE 1Y 2 57ANaD?I�_ (7 DIRECT THRU I I PANIC LINE To Cement Unit 3-1116' 15M by 10 M DSAF 3.1116" IOM by 4.1116" 10M Spool �aA.uc _ -^E ©1 Ed LO -TORQUE VALVE N pple O � 3-S'S'tiA SMAFti'EF AWJ:M I, LO-TOPCUE FILL UPI vA1vE BLEED OFF LINE TO BELL NIPPLE A), . .ervKe s+anma z Gtoser.Ke Stxdo9e 1 Sentor v4 :xz wtca 0"",4 iuc." \\�=�VCe � sen•.w w txz wvco % ru r,� s.na: 1151' IOM DOUBLE CAMERON TYPE U W T302 O ... �� OQ eQ WECO 4^O.� eKiF (�� SCSirrttArBc UTC 4-1:16' lC-M Marval and 3.VI6-, 10M HCR on Ctxke lure side 10M by 15M DSAF 1, 21 1 CHOKE AND KILL LINES FROM HCR TO MANIFOLDS ARE ISM rCrc 8l ���/ ® ��• I, LO-TOPCUE FILL UPI vA1vE BLEED OFF LINE TO BELL NIPPLE A), 13Sv8-10SINGLE I ssT rav acv sTAu CAMERON TYPE U� RAM Page 43 Revision 0 July, 2019 � �J r[sr sEocA r/ tnv 6 1151' IOM DOUBLE CAMERON TYPE U O RAMS C 4-1:,6' 10M Manual and HCR valves w Kill Line Side With 10M by ISM DSAF 4-1:16' lC-M Marval and 3.VI6-, 10M HCR on Ctxke lure side 10M by 15M DSAF 1, 21 1 CHOKE AND KILL LINES FROM HCR TO MANIFOLDS ARE ISM O 11116' 10M by ISM DSAF 4.1116' 10M by 3.1116' 10M DSAF 13Sv8-10SINGLE I ssT rav acv sTAu CAMERON TYPE U� RAM Page 43 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 Ifilcorp Alaska, LLC Ib tD d �.l iTN♦ 4N 191AF4. F a Page 44 Revision 0 July, 2019 I Ililcorp Alaska, LLC GP 55RD Drilling Procedure Rev 0 29.0 Casing Design Information Calculation & Casing Design Factors DATE: 7/16/2019 WELL: GP 55RD FIELD: Granite Point DESIGN BY: Monty M Myers Desian Criteria: Hole Size 8-3/8" Mud Density: 9.5 ppg Hole Size 6-1/8" Mud Density: 9.5 ppg Hole Size Mud Density: Drilling Mode MASP: 3513 Production Mode MASP: 2342 Collapse Calculation: Section Calculation 1, 2 Normal gradient external stress (0.44 psi/ft) and the casing evacuated for the internal stress L, *— C? Page 45 Revision 0 July, 2019 Casing Section Calculation/Specification 1 2 3 4 Casing OD 7" 5" Top (MD) 4,81_4: 9,300 - Y Top (TVD) 3,987 8,133 Bottom (MD) 9,500 15,086 Bottom (TVD) 8,328 10,332 Length 4,686 5,786 Weight (ppf) 29 18 Grade L-80 P-110 _._.. ___.._.._.._..._.._...____._. Connection _..._......._ DWC/C HYD513 Weight w/o Bouyancy Factor (lbs) 35 229,767 276,198 ® Tension at Top of Section (lbs) .__.__ 229,767 .._._._... .......... __ 276,198 Min strength Tension (1000 lbs) Worst Case Safety Factor (Tension) 676 2.94 7 419 _ 1.52 Collapse Pressure at bottom (Psi) 4,114 4,546 Collapse Resistance w/o tension (Psi) 7,030 14,840 Worst Case Safety Factor (Collapse) 1.71 3.26 MASP (psi) 2,817 2,311 Minimum Yield (psi) 8,160 15,840 Worst case safety factor (Burst) 2.90 6.85 Page 45 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 30.0 8-3/8" Hole Section MASP Maximum Anticipated Surface Pressure Calculation Hilaorp 8-3/8 Hole Section GP 55RD Kenai, Alaska MD TVD Planned Top: 5014 4114 Planned TD: 9500 8328 Anticipated Formations and Pressures: Formation TVD Est Pressure Oil/Gas/Wet PPG Grad TD 8,328 3,650 Oil/Water 8.4 0.44 Offset Well Mud Densities Well MW ranee Too (TVD) Bottom (TVD) Date A-27RD2 9.3-9.5 7,755 9,718 2016 K-24RD3 8.9-9.3 8,768 9,994 2017 A-27RD 9.5-9.7 6,328 9,950 1997 K-06RD2 9.0-9.3 6,352 9,792 2017 Assumptions: 1. Maximum planned mud density for the 8-3/8" hole section is 9.5 ppg. 2. Calculations assume reservoirs contain 100% gas (worst case). 3. Calculations assume worst case event is complete evacuation of wellbore to gas. 4. Anticipated fracture gradient at 4130' TVD =12.5 ppg EMW Fracture Pressure at 8-3/8" window considering a full column of gas from window to surface: 4114 (ft) x 0.65(psi/ft)= 2674 psi 2674 (psi) - [0.1(psi/ft)*4114(ft)]= 2263 psi MASP from pore pressure; entire wellbore evacuated to gas from TD 8328 (ft) x 0.44(psi/ft)= 3664 psi 3664(psi) - [0.1(psi/ft)*8328(ft)]= 3253 psi 3664(psi) - [(2/3)*0.1(psi/ft)*8328(ft)]+[(1/3)*0.44(psi/ft)*8328(ft)]= 1887 psi JAIternate Drilling MASP Summary: 1. MASP while drilling 8-3/8" intermediate hole is governed by SIBHP minus entire wellbore evacuated to gas from TD. Page 46 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 IIilc—p Alaska. 1.1.11 31.0 6-1/8" Hole Section MASP Maximum Anticipated Surface Pressure Calculation 14 Hilcorp 6-1/8" Hole Section GP 55RD Kenai, Alaska MD TVD Planned Top: 95W 8328 Planned TD: 15086 10332 Anticioated Formations and Pressures: Formation TVD Est Pressure Oil/Gas/Wet PPG Grad C7C 9,532 4150 Water 8.4 0.44 TD 10,332 4500 Oil/Water 8.4 0.44 Offset Well Mud Densities Well MW ranee Ton (TV DI Bottom (TVDI Date A-27RD2 9.3-9.5 7,755 9,718 2016 K-24RD3 8.9-9.3 8,768 9,994 2017 A-27RD 9.5-9.7 6,328 9,950 1997 K-06RD2 9.0-9.3 6,352 9,792 2017 Assumptions: 1. Maximum planned mud density for the 6-1/8" hole section is 9.5 ppg. 2. Calculations assume reservoirs contain 100% gas (worst case). 3. Calculations assume worst case event is complete evacuation of wellbore togas. 4. Anticipated fracture gradient at 9474' TVD =12.5 ppg EMW Fracture Pressure at 7" shoe considering a full column of gas from windowto surface: 8328 (ft) x 0.65(psi/ft)= 5413 psi 5413 (psi) - [0.1(psi/ft)*8328(ft)]= 4580 psi P' MASP from pore pressure; entire wellbore evacuated to gas from TD -- \ ! ' � 10332 (ft) x 0.44(psi/ft)= 4546 psi 4546(psi) - [0.1(psi/ft)*10332 (ft)]= 35 psi 4546(psi) - [(2/3)*0.1(psi/ft)*10332(ft)]+[(1/3)*0.44(psi/ft)*10332(ft)]= 2342 psi jAlternate Drilling MASP Summary: 1. MASP while drilling 6-1/8" production hole is governed by SIBHP minus 2/3 wellbore evacuated to gas from TD. 2. MASP during production mode is governed by SIBHP minus entire wellbore evacuated to gas from TD. Page 47 Revision 0 July, 2019 Ilih-orp Alaska, M.0 32.0 Plot (NAD 27) (Governmental Sections) `,GP-11-13RD � SGP-31-14rZD���, $HL r - 31-1 206 , f it �� < ` ! GP•2$+13 SHL GP S/ BHL PLAN GP-55RD_�HL • --____ -w�G,:a t lI 1��nn .- GP33-.4F @HL • GP -33-14 SHL PLAN GP-55RD TPH GP3�t�23Pp / o / •o r GP -Si -23 EHLe / o / p r O r r / t/ p / y GP42.23RD - , ; P o r Gj'C32-23 8HL SHL - - 1 1 t rr r GP•33-23 SHL 0 e o +GP -841`8 SHL ' o 0 0 0 00 0 O PL -.X\ C;P-55RD_l3HL GPS48HL • Sec. 26 ADL37.404 GP 55RD Drilling Procedure Rev 0 SHL / / t \ `CSP 32-13RDPI ! SOP -33-13 SHL / I + GP•22-YyRDs P81 I* 1 1 4 I � M I GP-2j-1V6r,P-24-13 SHL I ' 1 I i Granite Point Unit GP-55RD Well WPO8 Sog f gwit2w, WSecawre. 0 1.000 2000 Feet Alaska State Plane Zone 4. NAD27 Map Date: 7/1612019 Page 48 Revision 0 July, 2019 r 17 GP-11.24RD GRANITE PAINT; 'I ,�;88HL UNIT ADLl018761' , � GP -17-2480 t r t . SHL i i F!---12.14 8HL t d ! fr ( P-24-13RD2 f SHL•cy,y I � 1 y,tlrp t t F Legend 1 • PLAN GP-55RD_SHL t r 1 �/ X PLAN GP-55RD_TPH 1 I PLAN GP-55RD_BHL 1 1 • Other Surface Hole Location 1 1 • Other Bottom Hole Location 1 Well Paths u i Granite Point Unit GP-55RD Well WPO8 Sog f gwit2w, WSecawre. 0 1.000 2000 Feet Alaska State Plane Zone 4. NAD27 Map Date: 7/1612019 Page 48 Revision 0 July, 2019 Hilcorp :Alaska, I.LC 33.0 Slot Diagram (As Built) (NAD 27) 11 12 14 1 13 SECTION CORNER (PROTRACTED) N:2546957.328 E: 262081.754 W J Q U N 0 F- Hilcorp Alaska, I.AX 0 O EMP"ss Z CENTER LEG 1 LON: 151' 19' 53.62548'W LAT:60' S7' 29 46354"N N: 2544501.349 LON: 151' 19' 54.53956" LU Z N: 2544567.808 E: 263293.981 'J ASP ZONE 4 NAD 27 Z 2364'FNL 1305 FWL 1260' FWL U (1) 3T itRD1 0'260 LU FML (NTS) 31'1' 3 EN 1 33-t1RO 0 Ix CL PROTRACTED SECTION LINE NOT TO -r-- 1326' FML (NTS) am i CENTER LEG 2 LAT: 60' 57'29.91087"N ✓ LON: 151' 19'53.20585'W N: 2544611.886 E: 263360.744 ASP ZONE 4 NAD 27 2315 FNL 1326 FWL NO WELLS OR SLOTS OBSERVED GRANITE POINT PLATFORM ASBUILT WELL LOCATIONS jJ SECTION 13 T10N R12W 1371' FML (NTS) n43RD EWTYErn, -PTY Hilcorp Alaska, I.AX CENTER LEG 4 EMP"ss LAT: 60' 57' 28.81798"N 13W FML (NTS) / LON: 151' 19' 53.62548'W EMPTY N: 2544501.349 "`r° 1- 3 E: 263337.774 53 ASP ZONE 4 NAD 27 FNL Ew- EMPTY2430' 5W2 PURTv 1305 FWL NOTES 1. BASIS OF HORIZONTAL CONTROL: NAD83 US FEET POSITION (EPOCH 2010) AND VERTICAL CONTROL (NAVD88) IS AN OPUS SOLUTION FROM NGS STATIONS TBON, TSEA, AND ANC2 TO ESTABLISH POINT 91100 THE ALASKA STATE PLANE COORDINATES NAD 83 ZONE 4 IN FEET ARE: N = 2544351.693 E = 1403394.313 ELEV. =115.958 (NAVD88) 2. SECTION LINES SHOWN ARE EXTENSIONS OF PROTRACTED VALUES. 3. COORDINATE CONVERSIONS (NAD83 - NAD27) WERE DONE USING CORPSCON SOFTWARE VERSION 6.0.1 z 9 GP 55RD Drilling Procedure Rev 0 CENTER LEG 3 LAT: 60'57'29.26234'N LON: 151'19'52.28588-W N: 2544545.120 E: 263404.821 ASP ZONE 4 NAD 27 2385'FNL 1371' FWL f� II SCALE 0 30 60 FEET ..... .f.. ...... .� [AIN C. BROWN ENG:NFERIN°.NAPPIN°Su1NEYe:G.-ESS P.° BOF.Ge SOt°OiN/�AK 9°Cf9 Y—E rsol) -- � no 1 �� E4UR-. sANK.A ti,�..NE=ate+ Hilcorp Alaska, I.AX HILCORP ALASKA, LLC GRANITE POINT PLATFORM WELL SLOTS COOK INLET ALASKA AS BUILT SURFACE LOCATION NAD 27 (FOR INFORMATION ONLY) K. —E" Eooic Nc ,�-0, OCASb,+ PROTRACTED SEC. 13 T1 ON R1 2W SEWARD MERIDIAN, ALASKA "`r° 1- 3 Page 49 Revision 0 July, 2019 GP 55RD Drilling Procedure Rev 0 WELL I SLOT NORTHING NAD 27 EASTING LATITUDE (N) LONGITUDE (W) 60° 57'28,81798" CL LEG 3 2544545.120 263404.821 60° 57'29.26234" 151° 19'S2.28588" 2544506.617 31-13 1 2544550.59 263401.139 60° 57'29.31546" 151° 19'52.36268" 2 22-13RD2 2 2544551.711 263405.531 60' S7'29.32737" 151° 19'52.27421" 54 MUCI-1 3 2544549.723 263409.592 60° 57'29.30862" 151° 19'52.19116" MUCI-2 4 2544545.606 263411.397 60° 57'29.26844" 151° 19'52.15293" 151° 19'53.49299" 32-13RD 5 2544541.274 263410.117 60° 57'29.22553" 151° 19'52.17707" LEG 3 24-13RD 6 2544538.84 263406.528 60° S7'29.20086" 1S1° 19'52.24873" 7 42 -23RD 7 2544539.235 263401.999 60° 57'29.20384" 151° 19'52.34061" EMPTY 43063 8 2544542.441 263398.892 60° 57'29.23478" 151° 19'S2.40484" EMPTY 9 2544503.081 263331.389 60" 57'28.83376" 11-13RD 9 2544546.905 263398.51 60° S7'29.27865" 151° 19'52.41439" 263338.980 EMPTY 10 2544543.272 263406.149 60° 57'29.24441" 151° 19'52.25823" 2544501.035 GP -50 11 254454S. 1S 263402.616 60° 57'29.26219" 151° 19' 52.33053" 12 GP 51 12 2544547.233 263405.593 60° 57' 29.28330" 151° 19' 52.27110" 'APrtER1N0 � tLVAwO � SUR'VErt1:G i iESnN,i RO 80;160 SOLaOTNA AK !3664 1`aiCE. {36T�16LSr6 EA%. (96TI 1613361 Er.Wt �AItdLWE2r.,0:�Y£CG =0tr FRo.E`' HILCORP ALASKA. LLC GRANITE POINT PLATFORM WELL SLOTS COOK INLET ALASKA AS BUILT SURFACE LOCATION NAD 27 (FOR INFORMATION ONLY) PROTRACTED SEC. 13 T1 ON R1 2W SEWARD MERIDIAN, ALASKA REVt`a:OY - awrE. 2:+> oruwR sr :ce SCA=E rl'A GRO.ECl AD TTiG6 Book Ao ,�� SHEET 3 �F 3 CL LEG 4 2544501.349 263337.774 60° 57'28,81798" 151° 19'53.62548" EMPTY 1 2544506.617 263333.993 60" 57'28,86909" 151° 19' 53.70421" EMPTY 2 2544507.720 263338.358 60° S7'28.88083" 151" 19'53.61627" 54 3 2544505.736 263342.508 60° 57'28.86212" 151" 19'53.S3143" 55 4 2544501.552 263344.322 60° 57'28.82129" 151° 19'53.49299" LEG 4 S3 5 2544497.344 263342.958 60° S7'28.77958" 151° 19'53,51888" 52 6 2544494.923 263339.453 60" 57' 28.75505" 151" 19'53.58885" EMPTY 7 2544495.296 263334.763 60" 57'28.75778" 151° 19'S3.68396" EMPTY 8 2544498.575 263331.660 60° 57'28.78944" 151" 19'53.74816" EMPTY 9 2544503.081 263331.389 60" 57'28.83376" 151" 19'53.7S548" EMPTY 10 2544499.473 263338.980 60° 57'28.79975" 1S1° 19'S3,60030" EMPTY 11 2544501.035 263335.567 60° 57'28.81445" 151° 19'53.67005" EMPTY 12 2544503.340 263338.779 60" 57'28.83779" 151° 19'53.60597" 'APrtER1N0 � tLVAwO � SUR'VErt1:G i iESnN,i RO 80;160 SOLaOTNA AK !3664 1`aiCE. {36T�16LSr6 EA%. (96TI 1613361 Er.Wt �AItdLWE2r.,0:�Y£CG =0tr FRo.E`' HILCORP ALASKA. LLC GRANITE POINT PLATFORM WELL SLOTS COOK INLET ALASKA AS BUILT SURFACE LOCATION NAD 27 (FOR INFORMATION ONLY) PROTRACTED SEC. 13 T1 ON R1 2W SEWARD MERIDIAN, ALASKA REVt`a:OY - awrE. 2:+> oruwR sr :ce SCA=E rl'A GRO.ECl AD TTiG6 Book Ao ,�� SHEET 3 �F 3 GP 55RD Drilling Procedure Rev 0 Ilileorp Alaska, I.I.0 34.0 Directional Program (wp08) Page 51 Revision 0 July, 2019 Vertical Section (ft) sae„ M1=xoop Azimuth 211.470 with reference 0.00 N, 0.00 E reduction —3000 Z 0 s c —3750 —6000 —6750 Hilcorp Alaska, LLC ER BT�a Location: Cook Inlet, Alaska (Offshore) Slot: slot #4-06 GHES Hilcorp Alaska, LLC Faclilitd: GRANITE POINT Platform WellborPoint Field e: GP: GP5 5RD GECompany seale,�,,eM1=sop Easting (ft) —4500 —3750 —3000 —2250 —1500 —750 0 7507 :cRssRo e rvApnlrM Ala��sa. zo�ea sopa, us reel Tv vert cal Eaothsaxerelerencal to Actual RKB=192.00' RKB I Measures Oe IM1 rtrekrencal to Actual RKB=132.00' R K B T, rve 0i anter^ Oealln in tat SOt #4-06 dual RKB = 0 RKB io :132 feel aW-06 Ai Blolasl Oreet coo,al a�amM�l arere„caems,ol Crealeaabes m 20,9-0x-10 oarabaaa: WA Auckoem 26in Conductor-qk 0 Vertical Section (ft) sae„ M1=xoop Azimuth 211.470 with reference 0.00 N, 0.00 E reduction —3000 Z 0 s c —3750 —6000 —6750 Clearance Summary Report BAT�a ER GP-55RD_wp08-C1osest Approach Page 1 of 4 GHES Hilcorp Alaska, LLC GE company ]REFERENCE - ELLPATH IDENTIFICATION Operator Hilcorp Alaska, LLC Slot Islot #4-06 Area Cook Inlet, Alaska (Offshore) Well GP55RD Field Granite Point Field Wellbore GP-55RD Facility GRANITE POINT Platform Sidetrack from SDI Gyro <048425, MWD <4956-50115 at 5028.00 MD ]REPORT• • Projection System NAD27 / TM Alaska SP, Zone 4 (5004), US feet Software System WellArchitectO 5.1 North Reference True User Sopemick Scale 0.999964 Report Generated 16/Jul/2019 at 09:45 Convergence at slot 1.16° West Database WA ANC Defn WELLPATH LOCATION Ellipse Confidence Limit .00 Std Dev Ellipse Start MD Local coordinates Grid coordinates North[ft] East[ft] Easting[US ft] Northing[US ft] Geographic coordinates Latitude Longitude Slot Location -2436.29 1307.80 263339.45 2544494.92 60°57'28.755"N 151°19'53.589"W Facility Reference Pt 262081.75 2546957.33 60°57'52.746"N 151°20'20.074"W Field Reference Pt 267571.89 2557407.98 60°59'36.731"N 151°18'33.112"W IWELLPATH DATUM Ellipse Confidence Limit .00 Std Dev Ellipse Start MD Calculation method Minimum Curvature Actual RKB = 132.00' (RKB) to Facility Vertical. Datum 132.00ft Horizontal Reference Pt Slot Actual RKB = 132.00' (RKB) to mean sea level 132.00ft Vertical Reference Pt Actual RKB = 132.00' (RKB) Actual RKB = 132.00' (RKB) to Mud Line at Slot (slot 132.00ft #4-06) MD Reference Pt Actual RKB = 132.00' (RKB) Vertical Field Vertical Reference mean sea level Horizontal POSITIONAL UNCERTAINTY CALCULATION SETTINGS Ellipse Confidence Limit .00 Std Dev Ellipse Start MD 17.00ft Surface Position Uncertainty included Declination 15.56° East of TN Angle 73.80° Mag Field Strength 55330 nT Slot Surface Uncertainty @1SD —Dip Horizontal 2.000ft Vertical 1.000ft Facility Surface Uncertainty @1 SID Horizontal 50.000ft Vertical 5.000ft Positional Uncertainty values in the WELLPATH DATA table are the projection of the ellipsoid of uncertainty onto the vertical and horizontal planes Clearance Summary Report gT�a ER GP-55RD_wHp08-Closest Approach L�C�. Page 2 of 4 GHES Hilcorp Alaska, LLC GE company ANTI -COLLISION RULE Rule Name Hilcorp HSE Stop Drilling ACR Rule Based On IRatio Plane of Rule Closest Approach Threshold Value 11.00 Include Casing & Hole Size yes Apply Cone of Safety Ino HOLE & CASING SECTIONS - Ref Wellbore: GP-55RD Ref Wellpath: GP-55RD_wp08 Operator Hilcorp Alaska, LLC Slot Islot #4-06 Area Cook Inlet, Alaska (Offshore) Well GP55RD Field Granite Point Field Wellbore GP-55RD Facility GRANITE POINT Platform Sidetrack from SDI Gyro <0-4842'>, MWD <4956-5011'> at 5028.00 MD ANTI -COLLISION RULE Rule Name Hilcorp HSE Stop Drilling ACR Rule Based On IRatio Plane of Rule Closest Approach Threshold Value 11.00 Include Casing & Hole Size yes Apply Cone of Safety Ino HOLE & CASING SECTIONS - Ref Wellbore: GP-55RD Ref Wellpath: GP-55RD_wp08 Start MD Ift] End MD Positional Uncertainty Model Ift] Log Name/Comment String/Diameter Start MD ft End MD ft Interval ft Start TVD ft End TVD ft Start N/S ft Start E/W ft End N/S ft End E/W ft 8.375in Open Hole 5028.00 9500.00 4472.00 4123.89 8327.83 -1869.90 -1088.56 -2385.18 -2208.59 7in Casing Intermediate 5028.00 9500.00 4472.00 4123.89 8327.83 -1869.90 -1088.56 -2385.18 -2208.59 6.1251n Open Hole 9500.00 15085.86 5585.86 8327.83 10332.00 -2385.18 -2208.59 -6618.86 -4051.97 Sin Casing Production 9500.00 15085.86 5585.86 8327.83 10332.00 -2385.18 -2208.59 -6618.86 -4051.97 SURVEY PROGRAM - Ref Wellbore: GP-55RD Ref Wellpath: GP-55RD_wp08 Start MD Ift] End MD Positional Uncertainty Model Ift] Log Name/Comment Wellbore 17.00 4842.00 SDI Keeper v1.04 SDI Gyro <0-4842> GP55 4842.00 5028.00 BHI MTC (Collar, pre -2000) (Standard) MWD <1594-5011'> GP55 5028.00 9500.00 BHI OnTrak (MagCAD+IFR1, SAG) GP-55RD 9500.00 15085.86 BHI OnTrak (MagCAD+IFR1, SAG) GP-55RD H Hilcorp Alaska, LLC Clearance Summary Report GP-55RD_wp08-Closest Approach Page 3 of 4 BA ER HaUGHES GE company CALCULATION RANGE & CUTOFF From: 17.00ft MD To: 15085.86ft MD C -C Cutoff: (none) OFFSET WELL CLEARANCE SUMMARY (40 Offset Wellpaths selected) Ratios are calculated in Closest Approach plane Operator Hilcorp Alaska, LLC Slot slot #4-06 Area Cook Inlet, Alaska (Offshore) Well GP55RD Field Granite Point Field Wellbore GP-55RD Facility GRANITE POINT Platform Sidetrack from SDI Gyro <0-48425, MWD <4956-50115 at 5028.00 MD CALCULATION RANGE & CUTOFF From: 17.00ft MD To: 15085.86ft MD C -C Cutoff: (none) OFFSET WELL CLEARANCE SUMMARY (40 Offset Wellpaths selected) Ratios are calculated in Closest Approach plane Offset Offset Offset FacilitV Slot Well Offset Wellbore Offset Wellpath C -C Clearance Distance ACR Separation Ratio Ref Min C -C Diverging Ref MD of Min Min Ratio ACR MD Clear Dist from MD Min Ratio Ratio Dvrg from Status t ft ft ft GRANITE POINT Platform slot #1-04 GP31-23 GP31-23 SDI Gyro <0-9740.50>, GMS -9799-11199> 8492.32 209.02 11517.00 --I" 8417.00 1.00 11717.00 FAIL GRANITE POINT Platform slot #1-09 GP32-23 GP32-23 GMS <41-12000', 12560.40 400.41 12560.40 12494.44 1.45 12494.44 PASS GRANITE POINT Platform slot #4-03 GP54 GP54 GSS<0-1091>MWD<1130-11944'> 6607.75 202.20 13517.00 6682.55 1.56 13517.00 PASS GRANITE POINT Platform slot #4-03 GP54 St1 IGP54 St1 MWD <11289 - 140865 6607.75 202.20 13628.001 6682.55 1.56 14417.00 PASS GRANITE POINT Platform slot #1-09 GP32-23Rd GP32-23Rd GMS ,8900-11986', 12940.951 501.26 12940.95 12870.15 2.061 12870.15 PASS GRANITE POINT Platform slot #1-09 GP33-23 GP33-23 MSS <8630-11376'> 5028.00 541.80 12928.00 12868.83 3.43 12868.83 PASS GRANITE POINT Platform slot #3-07 GP42-23RD GP42-23RD MWD -7367 - 13940', 5074.86 283.54 12817.00 12947.49 4.06 12947.49 PASS GRANITE POINT Platform slot #4-05 GP53 S1:2 GP53 St2 SDI <0-12746'>, MWD <12869-13336'>, MWD 13369'- 16657', 5028.00 1100.92 13117.00 14728.00 6.55 14728.00 PASS GRANITE POINT Platform slot #4-05 GP53 SIT GP53 St1 SDI <0-12746'>, MWD <12869-13866'>, MWD -13881-14556'> 5028.00 1100.92 13117.00 14728.00 6.55 14728.00 PASS GRANITE POINT Platform slot #4-05 GP53 GP53 SDI <0-12746'>, MWD <12869-13950'> 5028.00 1100.92 13117.00 14728.00 0.55 14728.00 PASS GRANITE POINT Platform slot #3-07 GP42-23 GP42-23 GMS<50-225'>MSS<518-977'>GMS<1000-14544'> 5074.86 283.54 15085.86 5172.44 7.49 15085.86 PASS GRANITE POINT Platform slot #1-03 GP33-14 GP33-14 GMS <100-11473'> 9972.50 1365.71 9972.50 10169.93 7.54 10169.93 PASS GRANITE POINT Platform slot #1-03 GP33-14RD GP33-14RD GMS <9200-11410'> 9909.491 1374.39 9909.49 9961.19 7.84 9961.19 PASS GRANITE POINT Platform slot #1-08 GP12-24 GP12-24 GMS <100-12200'> 5028.001 1569.71 12628.00 12817.00 8.36 12817.00 PASS GRANITE POINT Platform slot #4-06 GP55 GP55 SDI Gyro <0-4842'>, MWD <4956-5011', 5028.00 0.00 5028.00 5058.00 8.52 15085.86 PASS GRANITE POINT Platform slot #1-02 GP44-14 GP44-14 GMS <100-108505 9828.00 951.31 9828.00 9947.77 9.52 9947.77 PASS GRANITE POINT Platform slot #3-08 GP12-24 GP11-24 GMS <100-11800'> 5028.00 1135.94 10728.00 10674.03 10.76 10674.03 PASS GRANITE POINT Platform slot #3-06 GP24-13 GP24-13 GMS <100-10560', 5028.00 2053.631 5028.00 10679.00 25.87 10679.00 PASS GRANITE POINT Platform slot #3-06 GP24-13RD GP24-13RD GMS <9700-106405 5028.00 2053.63 5028.00 10169.50 26.28 10169.50 PASS GRANITE POINT Platform slot #1-05 GP31-14RD1 GP31-14RD1 GMS <0-11011'> 5028.00 2396.63 5028.00 7672.70 29.961 9417.00 PASS GRANITE POINT Platform slot #1-01 GP13-13 GP13-13 GMS <75-105725 5028.00 2157.88 9417.00 9828.00 32.38 9828.00 PASS GRANITE POINT Platform slot #1-05 GP31-14 GP31-14 MSS <4856 - 88765 5028.001 2396.63 5028.00 9460.85 32.44 9460.85 PASS GRANITE POINT Platform slot #1-05 GP31-14RD2 GP31-14RD2 GMS <4900-10191', 5028.00 2396.63 5028.00 9448.60 32.91 9448.601 PASS GRANITE POINT Platform slot #3-12 GP51 GP51 PGMS <100-118395 5029.001 2254.32 9828.00 10360.48 37.46 10360.48 PASS GRANITE POINT Platform Islot #1-06 GP44-11 GP44-11 GMS<75-306,1VISS<337-810'>GMS<900-12471', 1 5028.001 2756.19 5028.00 10012.51 37.48 10917.00 .PASS Clearance Summary Report, GP-55RD_wp08-C1osest Approach BT�a ER Page 4 of 4 GHES Hilcorp Alaska, LLC GE company REFERENCE WELLPATH IDENTIFICATION Operator HilCorp Alaska, LLC Slot Islot #4-06 Area Cook Inlet, Alaska (Offshore) Well GP55RD Field Granite Point Field Wellbore GP-55RD Facility GRANITE POINT Platform Sidetrack from SDI Gyro <0-48425, MWD <4956-50115 at 5028.00 MD CALCULATION RANGE & CUTOFF From: 17.00ft MD To: 15085.86ft MD IC -C Cutoff: (none) OFFSET WELL CLEARANCE SUMMARY (40 Offset Wellpaths selected) Ratios are calculated in Closest Approach plane Offset Offset Offset Fac, lit Slot Well Offset Wellbore Offset Wellpath C -C Clearance Distance ACR Separation Ratio Ref Min C -C Diverging Ref MD of Min Min Ratio ACR MD Clear Dist from MD Min Ratio Ratio Dvrg from Status Iffti ft ft GRANITE POINT Platform slot #3-11 GP50 GRANITE GP50 PGMS ,100-12163', 5028.00 2053.09 9917.00 -121- 10011.60 38.57 10011.60 PASS GRANITE POINT Platform slot #3-04 MUC-1-02 MUC-1-02 GMS <100-10830'> 5028.00 2595.13 5028.00 9717.00 44.92 10217.00 PASS GRANITE POINT Platform slot 43-05 GP33-13 GP33-13 GMS <2700-11450'> 5028.00 2231.04 5028.00 7672.44 48.43 10828.00 PASS GRANITE POINT Platform slot #3-09 GP11-13RD GP11-13RD PGMS <100-11560'> 5028.00 2370.05 5028.00 10228.00 52.18 10228.00 PASS GRANITE POINT Platform slot #3-09 GP11-13 GP11-13 GMS<350-11653'>PGMS<4025-7950'>GMS<8000-11653', 5028.00 2370.05 5028.00 9715.42 64.72 9928.00 PASS GRANITE POINT Platform slot #3-01 GP31-13 GP31-13 GMS ,100-10874', 5028.001 2931.56 5028.00 9903.12 64.83 10228.00 PASS GRANITE POINT Platform slot #3-03 MUC-1-01 MUC-1-01 GMS<75-11150'>MSS<12625-15715', 5028.00 3409.46 5028.00 7672.48 67.22 8517.00 PASS GRANITE POINT Platform slot 43-02 GP22-13 GP22-13 GCT Gyro <0-7002',GMS <7100-102255 5028.00 2563.44 5028.00 9428.00 69.551 9928.00 PASS GRANITE POINT Platform slot #3-02 GP22-13RD3 GP22-13RD3 MWD <11395-13934', 5028.00 2563.44 5028.00 8417.00 75.38 8517.00 PASS GRANITE POINT Platform slot #3-02 GP22-13RD2 GP22-13RD2 MWD <11453 -13821'> 5028.00 2563.44 5028.00 8417.00 75.38 8517.00 PASS GRANITE POINT Platform Islot 43-02 GP22-13RD1 GP22-13RD1 JMWD <6738 - 120365 5028.00 2563.44 5028.00 8417.00 75.38 8517.00 PASS GRANITE POINT Platform Islot 43-05 JGP 32-13RD GP32-13RD MWD <8478 - 125635 5028.00 2423.32 5028.00 7672.48 76.49 10228.00 PASS GRANITE POINT Platform slot #3-05 GP32-13RD PII GP32-13RD PB MWD ,9437 - 10270', 5028.00 2423.32 5028.00 7672.48 76.49 10228.00 PASS GRANITE POINT Platform slot #3-05 GP32-13 GP32-13 PGMS<0-8583'>GMS,8605 - 102005 5028.001 2423.32 5028.00 7672.48 76.49 10328.00 PASS GRANITE POINT Platform Islot #4-04 IGP52 IGP52 IRGSS <0-1122', 15028.001 3688.96 5028001 9472.39 1.81.17 15085.86 PASS Clearance Summary Report GP-55RD_wp08-Closest Approach BT�a ER Page 1 of 4 GHES Hilcorp Alaska, LLC GEcompany IREPORT Operator Hilcorp Alaska, LLC Slot Islot #4-06 Area Cook Inlet, Alaska (Offshore) Well IGP55RD Field Granite Point Field Wellbore GP-55RD Facility GRANITE POINT Platform Sidetrack from SDI Gyro <0-4842'>, MWD <4956-5011'> at 5028.00 MD IREPORT Projection System NAD27 / TM Alaska SP, Zone 4 (5004), US feet Software System WellArchitect® 5.1 North Reference True User Sopemick Scale 0.999964 Report Generated 16/Jul/2019 at 09:54 Convergence at slot 1.16° West Database WA ANC Defn DATUMIWELLPATH Ellipse Confidence Limit .00 Std Dev [Ellipse Start MD Calculation method Local coordinates North[ft] East[ft] Grid coordinates Easting[US ft] Northing US ft] Geographic coordinates Latitude Longitude Slot Location -2436.29 1307.80 263339.45 2544494.92 60°57'28.755"N 151°19'53.589"W Facility Reference Pt ertical 262081.75 2546957.33 60°57'52.746"N 151°20'20.074"W Field Reference Pt 5.000ft 267571.89 2557407.98 60°59'36.731"N 151°18'33.112"W DATUMIWELLPATH Ellipse Confidence Limit .00 Std Dev [Ellipse Start MD Calculation method Minimum Curvature Actual RKB = 132.00' (RKB) to Facility Vertical Datum 132.00ft Horizontal Reference Pt Slot Actual RKB = 132.00' (RKB) to mean sea level 132.00ft Vertical Reference Pt Actual RKB = 132.00' (RKB) Actual RKB = 132.00' (RKB) to Mud Line at Slot (slot 132.00ft #4-06) MD Reference Pt Actual RKB = 132.00' (RKB) ertical Field Vertical Reference mean sea level lHorizontal POSITIONAL UNCERTAINTY CALCULATION SETTINGS Ellipse Confidence Limit .00 Std Dev [Ellipse Start MD 117.00ft ISurface Position Uncertainty included Declination 15.56° East of TN Dip An le 73.80° IMag Field Strength 55330 nT Slot Surface Uncertainty 1SD JHorizontal 12.000ft ertical 1.000ft Facility Surface Uncertainty ISD lHorizontal 150.000ft Pertical 5.000ft Positional Uncertainty values in the WELLPATH DATA table are the projection of the ellipsoid of uncertainty onto the vertical and horizontal planes Clearance Summary Report BAT�a ER GP-55RD_wp08-C1osest Approach Page 2 of 4 GHES Hilcorp Alaska, LLC GE company ANTI -COLLISION RULE Rule Name Hilcorp Stop Drilling (offset is not HSE risk) Rule Based On lRatio Plane of Rule Closest Approach Threshold Value 11.00 Include Casing & Hole Size yes Apply Cone of Safety Ino HOLE & CASING SECTIONS - Ref Wellbore: GP-55RD Ref Wellpath: Operator Hilcorp Alaska, LLC Slot Islot #4-06 Area Cook Inlet, Alaska (Offshore) Well GP55RD Field Granite Point Field Wellbore IGP-55RD Facility GRANITE POINT Platform Sidetrack from SDI Gyro <0-4842'>, MWD <4956-50115 at 5028.00 MD ANTI -COLLISION RULE Rule Name Hilcorp Stop Drilling (offset is not HSE risk) Rule Based On lRatio Plane of Rule Closest Approach Threshold Value 11.00 Include Casing & Hole Size yes Apply Cone of Safety Ino HOLE & CASING SECTIONS - Ref Wellbore: GP-55RD Ref Wellpath: GP-55RD_wp08 Log Name/Comment Wellbore 17.00 4842.00 SDI Keeper v1.04 SDI Gyro <0-4842> GP55 String/Diameter Start MD ft End MD ft Interval Start TVD ftft] 9500.00 BHI OnTrak (MagCAD+IFR1, SAG) End TVD [ftl Start NIS rftlft Start E/W End NIS ft End E/W ft 8.375in Open Hole 5028.00 9500.00 4472.00 4123.89 8327.83 -1869.90 -1088.56 -2385.18 -2208.59 Tin Casing Intermediate 5028.00 9500.00 4472.00 4123.89 8327.83 -1869.90 -1088.56 -2385.18 -2208.59 6.125in Open Hole 9500.00 15085.86 5585.86 8327.83 10332.00 -2385.18 -2208.59 -6618.86 -4051.97 Sin Casing Production 9500.00 15085.86 5585.86 8327.83 10332.00 -2385.18 -2208.59 -6618.86 4051.97 SURVEY PROGRAM - Ref Wellbore: GP-55RD Ref Wellpath: GP-55RD_wp08 Start MD [ft] End MD Positional Uncertainty Model [ft] Log Name/Comment Wellbore 17.00 4842.00 SDI Keeper v1.04 SDI Gyro <0-4842> GP55 4842.00 5028.00 BHI MTC (Collar, pre -2000) (Standard) MWD <1594-5011'> GP55 5028.00 9500.00 BHI OnTrak (MagCAD+IFR1, SAG) GP-55RD 9500.00 15085.86 BHI OnTrak (MagCAD+IFR1, SAG) GP-55RD H Hilcorp Alaska, LLC Clearance Summary Report GP-55RD_wp08-Closest Approach Page 3 of 4 BA ER FUR a GE company CALCULATION RANGE & CUTOFF From: 17.00ft MD To: 15085.86ft MD C -C Cutoff: (none) OFFSET WELL CLEARANCE SUMMARY (40 Offset Wellpaths selected) Ratios are calculated in Closest Approach plane IDENTIFICATION Operator IHilcorp Alaska, LLC Slot slot #4-06 Area Cook Inlet, Alaska (Offshore) Well IGP55RD FieldGranite Point Field Wellbore GP-55RD Facility IGRANITE POINT Platform Sidetrack from SDI Gyro <0-48425, MWD <4956-50115 at 5028.00 MD CALCULATION RANGE & CUTOFF From: 17.00ft MD To: 15085.86ft MD C -C Cutoff: (none) OFFSET WELL CLEARANCE SUMMARY (40 Offset Wellpaths selected) Ratios are calculated in Closest Approach plane OffsetOffset Offset Facilit Slot Well Offset Wellbore Offset C -C Clearance Distance I ACR Separation Ratio Ref Min C -C Diverging Ref MD of Min Min Ratio ACR MD Clear Dist from MD Min Ratio Ratio Dvrg from Status rfti ft ft ft ft GRANITE POINT Platform slot #1-04 GP31-23 GP31-23 SDI Gyro <0-9740.505, GMS 19799-11199> 8492.32 209.02 11517.00 8417.00 1.50 11717.00 PASS GRANITE POINT Platform slot #1-09 GP32-23 GP32-23 GMS <41-120005 12560.40 400.41 12560.40 12494.44 2.18 12494.44 PASS GRANITE POINT Platform slot #4-03 GP54 GP54 GSS<0-1091>MWD<l 130-11944'> 6607.75 202.20 13517.00 6682.55 2.33 13517.00 PASS GRANITE POINT Platform slot #4-03 GP54 St1 IGP54 SO MWD <11289 - 140865 6607.75 202.20 13628.00 6682.55 2.33 14417.00 PASS GRANITE POINT Platform slot #1-09 GP32-23Rd GP32-23Rd GMS <8900-11986'> 12940A51 501.26 12940,951 12870.15 3.091 12870.15 PASS GRANITE POINT Platform slot #1-09 GP33-23 GP33-23 MSS <8630-113765 5028.00 541.80 12928.00 12868.83 5.14 12868.83 PASS GRANITE POINT Platform slot #3-07 GP42-23RD GP42-23RD MWD <7367 - 13940'5 5074.86 283.54 12817.00 12947.49 6.09 12947.49 PASS GRANITE POINT Platform slot #4-05 GP53 St2 GP53 St2 SDI <0-12746'5, MWD 112869-13336'>, MWD <13369'- 166575 5028.00 1100.92 13117.00 14728.00 9.82 14728.00 PASS GRANITE POINT Platform slot #4-05 GP53 St1 GP53 St1 SDI <0-12746'5, MWD 112869-13866'5, MWD 113881-145565 5028.00 1100.92 13117.00 14728.00 9.82 14728.00 PASS GRANITE POINT Platform slot #4-05 GP53 GP53 SDI <0-12746'>,.MWD <12869-13950'> 5028.00 1100.92 13117.00 14728.00 9.82 14728.00 PASS GRANITE POINT Platform slot #3-07 GP42-23 GP42-23 GMS<50-225'>MSS<518-977',GMS<1000-145445 5074.86 283.54 15085.86 5172.44 11.23 15085.86 PASS GRANITE POINT Platform slot #1-03 GP33-14 GP33-14 GMS <100-11473'> 9972.50 1365.71 9972.50 10169.93 11.31 10169.93 PASS GRANITE POINT Platform slot #1-03 GP33-14RD GP33-14RD GMS <9200-11410'> 9909.49 1374.39 9909.49 9961.19 11.76 9961.19 PASS GRANITE POINT Platform slot #1-08 GP12-24 GP12-24 GMS <100-12200'> 5028.00 1569.71 12628.00 12817.00 12.54 12817.00 PASS GRANITE POINT Platform slot #4-06 GP55 GP55 SDI Gyro <0-4842'>, MWD <4956-5011'5 5028.00 0.00 5028.00 5058.00 12.76 15085.86 PASS GRANITE POINT Platform slot #1-02 GP44-14 GP44-14 GMS <100-10850'> 9828.00 951.31 9828.00 9947.77 14.28 9947.77 PASS GRANITE POINT Platform slot #3-08 GP12-24 GP11-24 GMS <100-11800'> 5028.00 1135.94 10728.00 10674.03 16.14 10674.03 PASS GRANITE POINT Platform slot #3-06 GP24-13 GP24-13 GMS <100-10560'> 5028.00 2053.63 5028.00 10679.00 38.81 10679.00 PASS GRANITE POINT Platform slot #3-06 GP24-13RD GP24-13RD GMS 19700-10640', 5028.00 2053.63 5028.00 10169.50 39.42 10169.50 PASS GRANITE POINT Platform slot#1-05 GP31-14RD1 GP31-14RD1 GMS <0-11011'5 5028.00 2396.63 5028.00 7672.70 44.95 9417.00 PASS GRANITE POINT Platform slat #1-01 GP13-13 GP13-13 GMS 175-105725 5028.00 2157.88 9417.00 9828.00 48.57 9828.00 PASS GRANITE POINT Platform slat #1-05 GP31-14 GP31-14 MSS <4856 - 88765 5028.00 2396.63 5028.00 9460.85 48.66 9460.85 PASS GRANITE POINT Platform slot 41-05 GP31-14RD2 GP31-14RD2 GMS <4900-10191'5 5028.00 2396.63 5028.00 9448.6049.36 9448.60 PASS GRANITE POINT Platform slot #3-12 GP51 GP51 PGMS <100-11839'> 5028.00 2254.32 9828.00 10360.48 56.20 10360.48 PASS GRANITE POINT Platform slot#1-06 GP44-11 GP711 GMS175-306'>MSS<337-810',GMS<900-12471'> 5028.00 2756.19 5028.00 10012.51 56.23 10917.00 PASS Clearance Summary Report GP-55RD_wp08-Closest Approach BT�a ER Page 4 of 4 GHES Hilcorp Alaska, LLC GEcompany CALCULATION RANGE & CUTOFF From: 17.00ft MD To: 15085.86ft MD C -C Cutoff: (none) OFFSET WELL CLEARANCE SUMMARY (40 Offset Wellpaths selected) Ratios are calculated in Closest Approach plane Operator HI Corp Alaska, LLC Islot Islot #4-06 Area Cook Inlet, Alaska (Offshore) lWell IGP55RD Field Granite Point Field Wellbore IGP-55RD Facility GRANITE POINT Platform ISidetrack from SDI Gyro <0-48425, MWD <4956-5011', at 5028.00 MD CALCULATION RANGE & CUTOFF From: 17.00ft MD To: 15085.86ft MD C -C Cutoff: (none) OFFSET WELL CLEARANCE SUMMARY (40 Offset Wellpaths selected) Ratios are calculated in Closest Approach plane Offset Offset Offset Facilit Slot Well Offset Wellbore Offset Wellpath C -C Clearance Distance ACR Separation Ratio Ref Min C -C Diverging Ref MD of Min Min Ratio ACR MD Clear Dist from MD Min Ratio Ratio Dvrg from Status ft ft ft ft ft GRANITE POINT Platform slot #3-11 GP50 GP50 PGMS 1100-12163', 5028.00 2053.09 9917.00 10011.60 57.85 10011.60 PASS GRANITE POINT Platform slot #3-04 MUC-1-02 MUC-1-02 GMS 1100-10830', 5028.00 2595.13 5028.00 9717.00 67.38 10217.00 PASS GRANITE POINT Platform slot #3-05 GP33-13 GP33-13 GMS 12700-11450'> 5028.00 2231.04 5028.00 7672.44 72.65 10828.00 PASS GRANITE POINT Platform slot 43-09 GP11-13RD GP11-13RD PGMS 11 00-1 1560', 5028.00 2370.05 5028.00 10228.00 78271 10228.00 PASS GRANITE POINT Platform slot #3-09 GP11-13 GP11-13 GMS<350-11653',PGMS<4025-7950'>GMS<8000-11653'> 5028.001 2370.05 5028.00 9715.42 97.08 9928.00 PASS GRANITE POINT Platform slot #3-01 GP31-13 GP31-13 GMS <100-10874'> 5028.00 2931.56 5028.00 9903.12 97.25 10228.00 PASS GRANITE POINT Platform slot #3-03 MUC-1-01 MUC-1-01 GMS<75-11150'>MSS<12625-157155 5028.00 3409.46 5028.00 7672.48 100.83 8517.00 PASS GRANITE POINT Platform slot #3-02 GP22-13 GP22-13 GCT Gyro <0-7002',GMS <7100-10225'1 5028.00 2563.44 5028.00 9428.00 104.32 9928.00 PASS GRANITE POINT Platform slot #3-02 GP22-13RD3 GP22-13RD3 MWD <11395-13934'> 5028.00 2563.44 5028.00 8417.00 113.07 8517.00 PASS GRANITE POINT Platform slot #3-02 GP22-.13RD2 GP22-13RD2 MWD <11453-13821', 5028.00 2563.44 502800 8417.00 113.07 8517.00 PASS GRANITE POINT Platform slot #3-02 GP22-13RD1 7P22-13RD1 JMWD 16738 -120365 5028.00 2563.44 5028.00 8417.00 113.07 8517.00 PASS GRANITE POINT Platform slot #3-05 GP 32-13RD GP32-13RD MWD <8478 - 12563'> 5028.00 2423.32 5028.00 7672.48 114.73 10228.00 PASS GRANITE POINT Platform slot #3-05 GP32-13RD PB GP32-13RD PB MWD <9437 - 10270', 15028.001 2423.32 5028.001 7672.48 114.73 10228.00 PASS GRANITE POINT Platform slot #3-05 GP32-13 GP32-13 PGMS<0-8583'>GMS<8605 - 10200', 5028.00 2423.32 5028.00 7672.48 114.73 10328.00 PASS GRANITE POINT Platform slot #4-04 GP52 GP52 RGSS <0-1122', 5028.00 3688.96 5028.00 9472.3 271.75 15085.86 PASS M® 14 1 13 SECTION CORNER (PROTRACTED) N: 2546721.483 E: 1402105.048 PROTRACTED SECTION LINE NOT TO SCALE G7 CENTER LEG 3 f -- IGINEERING /MAPPING I SURVEYING I TESTING Z LON: 151'20'0.36127"W W P O BOX 468 SOLDOTNA, AK. 99669 J E: 1403428.033 Q VOICE: (907) 283-4218 FAX (907) 283-3265 U 1371' FWL L7 EMAIL' SAMCLANE@MCLANECGCOM 0 O Z CENTER LEG 1 LAT: 60' 57'27.45392"N W LON: 151' 20' 2.61501"W Z N: 2544332.040 _I E: 1403317.194 Z ASP ZONE 4 NAD 83 z 2364' FNL 1260' FWL I` U 44-11 W U) 91-14RDY LLj--A, 1260' FWL (NTS) EMPTY-- Q 33.14RD 44 14 0 V -- N 2 z N �-- 1326' FWL (NTS) 1&13 -- 1305' FWL (NTS) z CENTER LEG 2 LAT: 60. 57'27,90125"N LON: 151° 20' 1.28126"W N: 2544376.114 E: 1403383.958 ASP ZONE 4 NAD 83 2319' FNL 1326' FWL NO WELLS OR SLOTS OBSERVED z 0 n GRANITE POINT PLATFORM ASBUILT WELL LOCATIONS SECTION 13 T10N R12W 1371' FWL (NTS) - EMPTY EMPTY EMPTY 0 EMPTY o EMPTY EMPTY NOTES 1. BASIS OF HORIZONTAL CONTROL: NAD83 US FEET POSITION (EPOCH 2010) AND VERTICAL CONTROL (NAVD88) IS AN OPUS SOLUTION FROM NGS STATIONS TBON, TSEA, AND ANC2 TO ESTABLISH POINT #1100 THE ALASKA STATE PLANE COORDINATES NAD 83 ZONE 4 IN FEET ARE: N = 2544351.693 E = 1403394.313 ' ELEV. = 115.958 (NAVD88) 2. SECTION LINES SHOWN ARE EXTENSIONS OF PROTRACTED VALUES. Con3uLking Inc CENTER LEG 3 IGINEERING /MAPPING I SURVEYING I TESTING OPfi1 3/ 1 -18PO2 LON: 151'20'0.36127"W P O BOX 468 SOLDOTNA, AK. 99669 11.13FID I t E: 1403428.033 ® Muds VOICE: (907) 283-4218 FAX (907) 283-3265 11-24 Sa 1371' FWL EMAIL' SAMCLANE@MCLANECGCOM Hilcorp Alaska, I.LC CENTER LEG 4 LAT: 60.57' 26.80839"N LON: 151'20'1.70089"W N: 2544265.583 E: 1403360.985 ASP ZONE 4 NAD 83 2430' FNL 1305' FWL / IC` 1liF NORTH SCALE 0 30 60 FEET JAMES A. HALL 85032-S c ;R VFESeSiDIO(K�����.�� PROJECT HILCORP ALASKA, LLC GRANITE POINT PLATFORM WELL SLOTS COOK INLET ALASKA AS BUILT SURFACE LOCATION NAD 83 LOCATION PROTRACTED SEC. 13 T1 ON R12W SEWARD MERIDIAN, ALASKA REVISION: 3 DATE: 5/23/19 DRAWN BY: BGS SCALE: 1'=30' PROJECTING. 177008 BOOK NO 1&03 SHEET 1-3 CENTER LEG 3 LAT: 60'57'27.25274"N OPfi1 3/ 1 -18PO2 LON: 151'20'0.36127"W N: 2544309.350 11.13FID I t E: 1403428.033 ® Muds ASP ZONE 4 NAD 83 2385' FNL 11-24 Sa 1371' FWL CENTER LEG 4 LAT: 60.57' 26.80839"N LON: 151'20'1.70089"W N: 2544265.583 E: 1403360.985 ASP ZONE 4 NAD 83 2430' FNL 1305' FWL / IC` 1liF NORTH SCALE 0 30 60 FEET JAMES A. HALL 85032-S c ;R VFESeSiDIO(K�����.�� PROJECT HILCORP ALASKA, LLC GRANITE POINT PLATFORM WELL SLOTS COOK INLET ALASKA AS BUILT SURFACE LOCATION NAD 83 LOCATION PROTRACTED SEC. 13 T1 ON R12W SEWARD MERIDIAN, ALASKA REVISION: 3 DATE: 5/23/19 DRAWN BY: BGS SCALE: 1'=30' PROJECTING. 177008 BOOK NO 1&03 SHEET 1-3 WELL I SLOT NO WELLS OR SLOTS OBSERVED NAD 83 NORTHING EASTING LATITUDE (N) LONGITUDE (W) LEG 1 CL LEG 1 2544332.040 1403317.194 60° 57'27.45392" 151° 20'2.61501" 13-13 1 2544326.604 1403320.680 60° 57' 27.40110" 151° 20'2.54219" 44-14 2 2544325.687 1403316.323 60° 57'27.39120" 151° 20' 2.63003" 33-14RD 3 2544327.651 1403312.148 60° 57'27.40970" 151° 20'2.71538" 31-23 4 2544331.855 1403310.383 60° 57'27.45074" 151° 20'2.75285" 31-14RD2 5 2544336.127 1403311.760 60° 57'27.49308" 151° 20'2.72673" 44-11 6 2544338.679 1403315.516 60° 57'27.51896" 151° 20'2.65173" EMPTY 7 2544338.128 1403319.911 60° 57'27.51441" 151° 20'2.56251" 12-24 8 2544334.819 1403323.154 60° 57'27.48248" 151° 20'2.49548" 32-23 9 2544330.275 1403323.347 60° 57'27.43778" 151° 20' 2.48969" EMPTY* 10 2544330.668 1403319.018 60° 57'27.44078" 151° 20'2.57751" EMPTY* 11 2544331.146 1403315.094 60° 57' 27.44470" 151° 20' 2.65717" EMPTY* 12 2544334.306 1403317.470 60° 57'27.47629" 151° 20' 2.61036" LEG 2 CL LEG 2 --F2544376.1141 1403383.958 60° 5727.9012 151° 20' 1.28126" NO WELLS OR SLOTS OBSERVED * = MATHEMATICALLY COMPUTED POSITION, NO ASBUILT POSITION LOCATED. C°nwLNng Inc (ENGINEERING I MAPPING I SURVEYING I TESTING P.0 BOX 488 SOLDOTNA, AK. 99889 VOICE: (907)2834218 FAX (907)2833285 EMAIL'. SAMCLANE@MCLANECG COM PROJECT HILCORP ALASKA, LLC GRANITE POINT PLATFORM WELL SLOTS COOK INLET ALASKA AS BUILT SURFACE LOCATION NAD 83 LOCATION PROTRACTED SEC. 13 T1 ON R1 2W SEWARD MERIDIAN, ALASKA REVISION: 3 DATE. 523/19 DRAWN BY: BGB SCALE: NIA PROJECT NO. 177008 BOOK NO. 18-03 SHEET OF 3 WELL I SLOT 2544265.583 NAD 83 60° 57'26.80839" NORTHING EASTING LATITUDE (N) LONGITUDE (W) LEG 3 CL LEG 3 2544309.350 1403428.033 60° 57'27.25274" 151° 20'0.36127" 31-13 1 2544314.82 1403424.351 60° 57'27.30586" 151' 20'0.43807" 22-13RD2 2 2544315.941 1403428.743 60° 57'27.31778" 151° 20' 0.34960" MUCI-1 3 2544313.953 1403432.804 60° 57'27.29902" 151° 20'0.26655" MUCI-2 4 2544309.836 1403434.608 60° 57'27.25884" 151° 20'0.22832" 32-13RD 5 2544305.504 1403433.328 60° 57'27.21594" 151° 20'0.25245" 24-13RD 6 2544303.071 1403429.739 60° 57'27.19126" 151° 20'0.32412" 42 -23RD 7 2544303.466 1403425.21 60° 57'27.19424" 151' 20'0.41600" 11-24 8 2544306.672 1403422.103 60° 57'27.22519" 151° 20'0.48023" 11-13RD 9 2544311.135 1403421.722 60° 57'27.26905" 151° 20'0.48979" EMPTY 10 2544307.502 1403429.36 60° 57'27.23481" 151' 20'0.33363" GP -50 11 2544309.381 1403425.828 60° 57' 27.25259" 151° 20' 0.40592" GP -51 12 2544311.4631 1403428.805160- 57' 27.27370" 151° 20' 0.34650" LEG 4 CL LEG 4 2544265.583 1403360.985 60° 57'26.80839" 151° 20'1.70089" EMPTY 1 2544270.851 1403357.204 60° 57'26.85950" 151° 20'1.77962" EMPTY 2 2544271.954 1403361.569 60° 57'26.87123" 151° 20'1.69169" 54 3 2544269.97 1403365.719 60' 57'26.85253" 151° 20'1.60683" 52 4 2544265.786 1403367.532 60° 57'26.81170" 151° 20'1.56840" 53 5 2544261.578 1403366.168 60° 57'26.76999" 151* 20'1.59428" 55 6 2544259.157 1403362.663 60° 57'26.74545" 151° 20'1.66426" EMPTY 7 2544259.53 1403357.974 60° 57'26.74819" 151° 20'1.75937" EMPTY 8 2544262.809 1403354.87 60" 57'26.77985" 151° 20'1.82357" EMPTY 9 2544267.315 1403354.6 60° 57'26.82416" 151° 20'1.83089" EMPTY 10 2544263.707 1403362.19 60" 57'26.79016" 151° 20'1.67571" EMPTY 11 2544265.269 1403358.777 60° 57'26.80485" 151' 20' 1.74547" EMPTY 12 12544267.57411403361.9891 60° 57'26.82819" 151` 20'1.68138" Cvn uLtinq Inc ENGINEERING I MAPPING I SURVEYING I TESTING P O BOX 488 SOLOOTNA, AK.99889 VOICE: (907) 2834218 FAX (907) 283-3285 EMML'. SAMCLANE@MCLANECGCOI,4 Hilcorp Alaska, LLC PROJECT HILCORP ALASKA, LLC GRANITE POINT PLATFORM WELL SLOTS COOK INLET ALASKA AS BUILT SURFACE LOCATION NAD 83 LOCATION PROTRACTED SEC. 13 T1 ON R1 2W SEWARD MERIDIAN, ALASKA REVISION: 3 DATE'. 5/23119 DRAWN BY: BGB SCALE: NIA PROJECT NO. 177008 BOOK NO. 18-03 SHEET OF 3 AOGCC PTD No. 219-103 Coordinate Check 18 July 2019 INPUT Geographic, NAD27 OUTPUT State Plane, NAD27 5004 - Alaska 4, U.S. Feet GRANITE POINT 55 R 1/1 Latitude: 60 57 28.75500 Longitude: 151 19 53.58900 Northing/Y: 2544494-918 Easting/X: 263339.445 Convergence: -1 09 51.04087 Scale Factor: 0.999963730 Remark: Corpscon v6.0.1, U.S. Army Corps of Engineers WELL I SLOT NORTHING EASTING NAD 27 LATITUDE (N) LONGITUDE (W) LEG 3 CL LEG 3 2544545.120 263404.821 60° 57'29.26234" 151° 19'52.28588" 31-13 1 2544550.59 263401.139 60° 57'29.31546" 151° 19'52.36268" 22-13RD2 2 2544551.711 263405.531 60° 57'29.32737" 151° 19'52.27421" MUCI-1 3 2544549.723 263409.592 60° 57'29,30862" 151° 19'52.19116" MUCI-2 4 2544545.606 263411.397 60° 57'29.26844" 151° 19'52.15293" 32-13RD 5 2544541.274 263410.117 60° 57'29.22553" 151° 19'52.17707" 24-13RD 6 2544538.84 263406.528 60° 57'29.20086" 151° 19'52.24873" 42 -23RD 7 2544539.235 263401.999 60° 57'29.20384" 151° 19'52.34061" 11-24 8 2544542.441 263398.892 60° 57'29.23478" 151° 19'52.40484" 11-13RD 9 2544546.905 263398.51 60° 57'29.27865" 151° 19'52.41439" EMPTY 10 2544543.272 263406.149 60° 57'29.24441" 151° 19'52.25823" GP -50 11 1 2544545.151 263402.616 60° 57'29.26219" 151° 19'52.33053" GP -51 12 2544547.233 263405.593 60° 57' 29.28330" 151° 19'52.27110" LEG 4 CL LEG 4 2544501.349 263337.774 60° 57'28.81798" 151° 19'53.62548" EMPTY 1 2544506.617 263333.993 60° 57'28.86909" 151° 19'53.70421" EMPTY 2 2544507.720 263338.358 60° 57'28.88083" 151° 19'53.61627" 54 3 2544505.736 263342.508 60° 57'28.86212" 151° 19'53.53143" 52 4 2544501.552 263344.322 60° 57'28.82129" 151° 19'53.49299" 53 5 2544497.344 263342.958 60° 57'28.77958" 151° 19'53.51888" 55 6 2544494.923 263339.453 60° 57'28.75505" 151° 19'53.58885" EMPTY 7 2544495.296 263334.763 60° 57'28.75778" 1510 19'53.68396" EMPTY 8 2544498.575 263331.660 60° 57'28.78944" 151° 19'53.74816" EMPTY 9 2544503.081 263331.389 600 57'28.83376" 151° 19'53.75548" EMPTY 10 2544499.473 263338.980 60° 57'28.79975" 151° 19'53.60030" EMPTY11 2544501.035 263335.567 60° 57'28.81445" 151° 19'53.67005" EMPTY 12 2544503.3401 263338.779 60° 57' 28.83779" 151° 19'53.60597" IGINEERING / MAPPING / SURVEYING 1 TESTING P.O BOX 468 SOLDOTNA, AK. 9%69 VOICE. (907)2834218 FAX (907)283-3265 EMAIL SAMCLANE@MCLANEGG.COM I ilcorp Alaska, LLC PROJECT HILCORP ALASKA, LLC GRANITE POINT PLATFORM WELL SLOTS COOK INLET ALASKA AS BUILT SURFACE LOCATION NAD 27 (FOR INFORMATION ONLY) LOCATION PROTRACTED SEC. 13 T1 ON R1 2W SEWARD MERIDIAN, ALASKA ./ REVISION: 3 DATE: 623/19 DRAWN BY: BGB SCALE NIA PROJECT NO. 177008 BOOK NO. 1&03 SHEET OF 3 11 12 PROTRACTED SECTION LINE NOT TO SCALE 14 13 EMPTY ETM EMPTY CENTER LEG 4 LAT: 60.57' 28.81798"N — 4---- 1305 vwl (NTS) 0 52 LON: 151. 19'53.62548"W EMPTY ® N: 2544501.349 E:263337 * 774 53 ASP ZON4 NAD 27 EMpTy EMPTY 2430' FNL 55 EMPTY 1305' FWL NOTES 1. BASIS OF HORIZONTAL CONTROL: NAD83 US FEET POSITION (EPOCH 2010) AND VERTICAL CONTROL (NAVD88) IS AN OPUS SOLUTION FROM NGS STATIONS TBON, TSEA, AND ANC2 TO ESTABLISH POINT #1100 THE ALASKA STATE PLANE COORDINATES NAD 83 ZONE 4 IN FEET ARE: N = 2544351.693 E = 1403394.313 ELEV. = 115.958 (NAVD88) 2. SECTION LINES SHOWN ARE EXTENSIONS OF PROTRACTED VALUES. 3. COORDINATE CONVERSIONS (NAD83 - NAD27) WERE DONE USING CORPSCON SOFTWARE VERSION 6.0.1 Con3ul6ng lnc SECTION CORNER 1 IGINEERING / MAPPING/ SURVEYING / TESTING (PROTRACTED) Vol11 CE: (907)2834218 FAX (907)283-3265 N:2546957.328 EMAIL- SAMCLANE@MCLANECGCOM Hilcorp Alaska, E: 262081.754 �o z CENTER LEG 2 LAT: 60. 57' 29.91087"N z Z LON: 151` 19'53.20585"W N: 2544611.886 W E: 263360.744 ASP ZONE 4 NAD 27 () ? 2319'FNL U)1326' z FWL ONO WELLS F— N OR SLOTS O —------ 7326' FWL (NTS) -- OBSERVED Z CENTER LEG 1 4 LAT: 60. 57'29.46354"N W LON: 151' 19' 54.5 Z N: 2544567.808 J E: 263293.981 ASP ZONE 4 NAD O 2364' FNL EMPTY 1260' FWL z H U 44-11 MPTY L 0 W " U) 311-114102 - lei -1244 ® 1260' FWL (NTS) GRANITE POINT PLATFORM IW- U stay 32-MCENTER EMPTY -� ASBUILT WELL LOCATIONS LEG 3 LAT: 60.57'29.26234"N < '� '3-19 SECTION 13 T10N R12W ' 31-' �' LON: 151.19' 52.28588"W '+ EMPTY 0 1111-13RD up t E:263404 8210 � d -� -- ------- 1371' FWL (NTS) _ � MU= ASP ZONE 4 NAD 27 2385' FNL 1371' FWL EMPTY ETM EMPTY CENTER LEG 4 LAT: 60.57' 28.81798"N — 4---- 1305 vwl (NTS) 0 52 LON: 151. 19'53.62548"W EMPTY ® N: 2544501.349 E:263337 * 774 53 ASP ZON4 NAD 27 EMpTy EMPTY 2430' FNL 55 EMPTY 1305' FWL NOTES 1. BASIS OF HORIZONTAL CONTROL: NAD83 US FEET POSITION (EPOCH 2010) AND VERTICAL CONTROL (NAVD88) IS AN OPUS SOLUTION FROM NGS STATIONS TBON, TSEA, AND ANC2 TO ESTABLISH POINT #1100 THE ALASKA STATE PLANE COORDINATES NAD 83 ZONE 4 IN FEET ARE: N = 2544351.693 E = 1403394.313 ELEV. = 115.958 (NAVD88) 2. SECTION LINES SHOWN ARE EXTENSIONS OF PROTRACTED VALUES. 3. COORDINATE CONVERSIONS (NAD83 - NAD27) WERE DONE USING CORPSCON SOFTWARE VERSION 6.0.1 Con3ul6ng lnc IGINEERING / MAPPING/ SURVEYING / TESTING P O. BOX 468 SOLDOTNA, AK. 99669 Vol11 CE: (907)2834218 FAX (907)283-3265 EMAIL- SAMCLANE@MCLANECGCOM Hilcorp Alaska, I.,LC All ...,�� ACq���,, *: 49 TM •.* •. 85 32-S EgFpP�Z y\\ Aw NORTH SCALE 0 30 60 FEET PROJECT HILCORP ALASKA, LLC GRANITE POINT PLATFORM WELL SLOTS COOK INLET ALASKA AS BUILT SURFACE LOCATION NAD 27 (FOR INFORMATION ONLY) LOCATION PROTRACTED SEC. 13 T1 ON R1 2W SEWARD MERIDIAN, ALASKA REVISION: 3 DATE: 503/19 DRAWN BY: BGB SCALE: 1-=30' PROJECT NO. 177038 BOOK NO. 16-03 SHEET 1 °` 3 WELL I SLOT NO WELLS OR SLOTS OBSERVED NAD 27 NORTHING EASTING LATITUDE (N) LONGITUDE (W) LEG 1 CL LEG 1 2544567.808 263293.981 60° 57'29.46354" 151° 19'54.53958" 13-13 1 2544562.372 263297.467 60° 57'29.41071" 151° 19'54.46676" 44-14 2 2544561.455 263293.110 60° 57'29.40081" 151° 19'54.55460" 33-14RD 3 2544563.419 263288.935 600 57'29.41932" 151° 19'54.63995" 31-23 4 2544567.623 263287.170 600 57'29.46036" 151° 19'54.67742" 31-14RD2 5 2544571.895 263288.547 60° 57'29.50269" 151° 19'54.65130', 44-11 6 2544574.447 263292.303 60° 57'29.52857" 151° 19'54.57630" EMPTY 7 2544573.896 263296.698 60° 57'29.52403" 151° 19'54.48708" 12-24 8 2544570.587 263299.941 60° 57'29.49210" 151° 19'54.42005" 32-23 9 2544566.043 263300.134 60° 57'29.44740" 151° 19'54.41426" EMPTY* 10 2544566.436 263295.805 60° 57'29.45040" 151° 19' 54.50209" EMPTY* 11 2544566.914 263291.881 60° 57'29.45432" 151° 19' 54.58174" EMPTY* 12 12544570.074 263294.257 60° 57' 29.48591" 151° 19'54.53493" LEG 2 CL LEG 2 25 611.8861 263360.744160- 57' 29.9108711 151° 19' 53.20585" NO WELLS OR SLOTS OBSERVED * = MATHEMATICALLY COMPUTED POSITIONS. NO ASBUILT POSITION LOCATED. ENGINEERING I MAPPING I SURVEYING : TESTING P.O. BOX 068 SOLDOTNA. AK. 99669 VOICE-. (907)2834216 FAX (907)283-3265 EMAIL SAMCLANE@MCLANECG COM PROJECT HILCORP ALASKA, LLC GRANITE POINT PLATFORM WELL SLOTS COOK INLET ALASKA AS BUILT SURFACE LOCATION NAD 27 (FOR INFORMATION ONLY) LOCATION PROTRACTED SEC. 13 T1 ON R1 2W SEWARD MERIDIAN, ALASKA REVISION: 3 DATE: 5/23/19 DRAWN BY: BGS SCALE: NIA PROJECT NO. 177008 BOOK NO. 1&03 SHEET 2- 13 Davies, Stephen F (CED) From: Monty Myers <mmyers@hilcorp.com> Sent: Friday, July 19, 2019 1:22 PM To: Davies, Stephen F (CED) Subject: RE: [EXTERNAL] Granite Point 55RD (PTD 219-103) - Question Attachments: 197014 Hilcorp Granite Point Platform Revised Leg 4 052319.pdf That is a great catch Steve! I now realize I forgot to update that table. When we started planning the redrill of 55 and looking at directional plans, there was a discrepancy between Halliburton and Baker on slot locations. We had the operators on the platform go out and verify which one was accurate and it turns out that 55 and 52 have been mislabeled since the 90's. Attached is the updated slot diagram. Monty M Myers Drilling Manager 907.538.1168 (c) 907.777.8431 (o) From: Davies, Stephen F (CED) [mailto:steve.davies@alaska.gov] Sent: Friday, July 19, 2019 11:37 AM To: Monty Myers <mmyers@hilcorp.com> Subject: [EXTERNAL] Granite Point 55RD (PTD 219-103) - Question Monty, Quick question: While reading through Hilcorp's Permit to Drill application for GP 55RD, I noticed that the surface X,Y coordinates provided on the Permit to Drill form do not match the NAD 27 northing and easting coordinates for Slot 55 in Leg 4 of the rig that are listed in the As -Built coordinate table on page 50. But they do match the coordinates for Slot 52 in that same leg. I realize it's a small difference, but I'm curious as to which coordinates are correct for GP 55RD. Thank you, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@aIaska.gov. The information contained in this e-mail message is confidential information intended only for the use of the recipient(s) named above. In addition, this communication may be legally privileged. If the reader of this e-mail is not an intended recipient, you have received this e-mail in error and any review, dissemination, distribution or copying is strictly prohibited. If you have received this e-mail in error, please notify the sender immediately by return e-mail and permanently delete the copy you received. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Schwartz, Guy L (CED) From: Monty Myers <mmyers@hilcorp.com> Sent: Wednesday, July 31, 2019 11:03 AM To: Rixse, Melvin G (CED) Cc: Schwartz, Guy L (CED) Subject: RE: [EXTERNAL] Request for PTD 219-103, Granite Point 55RD Clarifications Attachments: GP -55 Schematic 2019-07-17.doc Follow Up Flag: Follow up Flag Status: Flagged We have 2 anti -collision rules we apply. When it is 1.0, (ellipses of uncertainty are just touching) we typically apply this the non -producing wells, and call this our HSE risk AC. When it is a 1.5, (ellipses of uncertainty have half their radius in between the ellipses of uncertainty) we typically apply this to producing well or injection wells when there is a potential for HSE risk. While drilling near the well (31-23) we will shut off the gas lift to the well to avoid any potential for disaster if we were to encounter the well. So the pressures would be within a pound and half difference for fluid gradient. (8.6 ppg for 31-23 and a 9-9.5 ppg for GP55) Also attached is the current schematic for GP -55. Please let me know if you have additional questions. Thank you! Monty M Myers Drilling Manager 907.538.1168 (c) 907.777.8431 (o) From: Rixse, Melvin G (CED) [mailto:melvin.rixse@alaska.gov] Sent: Tuesday, July 30, 2019 12:22 PM To: Monty Myers <mmyers@hilcorp.com> Cc: Schwartz, Guy L (CED) <guy.schwartz@alaska.gov> Subject: RE: [EXTERNAL] Request for PTD 219-103, Granite Point 55RD Clarifications Monty, Regarding offset well GP 31-23, it appears that GP55 planned wellpath passes anti -collision scan rules with a minimum ratio changed from 1.0 to 1.5. (See the attachment) Questions: 1. What does that mean? 2. If a collision would occur, it would be above the production packer in 31-23 (at 7,801' MD) on that well, correct? a. In the event of a collision above the production packer, bottom hole pressure while drilling GP55 could be significantly different from the gas lift annulus of GP31-23 correct? (I don't understand the dual string tubing completion on GP31-23. Can you explain?) b. What would be the approximate pressure difference? Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-223-3605 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231) or (Melvin. Rixse@alaska.gov). cc. Guy Schwartz From: Monty Myers <mm ers hilcorp.com> Sent: Tuesday, July 30, 2019 9:14 AM To: Rixse, Melvin G (CED) <melvin.rixse@alaska.gov> Subject: RE: [EXTERNAL] Request for PTD 219-103, Granite Point 55RD Clarifications Great questions Mel! Please see responses in red below. Let me know if you have any additional questions. Thank you! Monty M Myers Drilling Manager 907.538.1168 (c) 907.777.8431 (o) From: Rixse, Melvin G (CED) [mailto:melvin.rixse@alaska.gov] Sent: Monday, July 29, 2019 10:49 AM To: Monty Myers <mmyers@hilcor .com> Subject: [EXTERNAL] Request for PTD 219-103, Granite Point 55RD Clarifications Monty, I have several questions before I can approve: 1. It appears, from the BakerHughes anticollision report that offset well GP31-23 fails Hilcorp collision risk criteria with the planned wellpath for GP55RD nearing within 209.02' at 8492. What is the status of GP31- 23? GP 31-23 is a gas lift producer currently online and producing. The AC failure is at our lowest separation ratio criteria of a 1.0, which means that the uncertainty ellipses just touch. With this being said there is very little risk with this AC on this well and as we drill past that point we will be monitoring for magnetic interference and vibration. If we notice either of the 2 we will rig up and run gyro surveys to steer past the well. 2. Does Hilcorp plan to change and test upper rams for running 7" liner? Yes, we will change out rams to 7" and test prior to running liner. 3. Do you want a 30 minute test on your 7" before drilling out, or wait until you test both 7" and 5" before running your completion? We will do a 30 minute test on the 7" before we drill out to ensure there are no leaks. 4. Are the variable rams 2-7/8" x 5.5" or 2-7/8 x 5" ?The variables are 2-7/8" X 5" Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-223-3605 Cell Rixse, Melvin G (CED) From: Monty Myers <mmyers@hilcorp.com> Sent: Tuesday, July 30, 2019 9:14 AM To: Rixse, Melvin G (CED) Subject: RE: [EXTERNAL] Request for PTD 219-103, Granite Point 55RD Clarifications Great questions Mel! Please see responses in red below. Let me know if you have any additional questions. Thank you! Monty M Myers Drilling Manager 907.538.1168 (c) 907.777.8431 (o) From: Rixse, Melvin G (CED) [mailto:melvin.rixse@alaska.gov] Sent: Monday, July 29, 2019 10:49 AM To: Monty Myers <mmyers@hilcorp.com> Subject: [EXTERNAL] Request for PTD 219-103, Granite Point 55RD Clarifications Monty, I have several questions before I can approve: 1. It appears, from the BakerHughes anticollision report that offset well GP31-23 fails Hilcorp collision risk criteria with the planned wellpath for GP55RD nearing within 209.02' at 8492. What is the status of GP31-23? GP 31-23 is a gas lift producer currently online and producing. The AC failure is at our lowest separation ratio criteria of a 1.0, which means that the uncertainty ellipses just touch. With this being said there is very little risk with this AC on this well and as we drill past that point we will be monitoring for magnetic interference and vibration. If we notice either of the 2 we will rig up and run gyro surveys to steer past the well. 2. Does Hilcorp plan to change and test upper rams for running 7" liner? Yes, we will change out rams to 7" and test prior to running liner. 3. Do you want a 30 minute test on your 7" before drilling out, or wait until you test both 7" and 5" before running your completion? We will do a 30 minute test on the 7" before we drill out to ensure there are no leaks. 4. Are the variable rams 2-7/8" x 5.5" or 2-7/8 x 5" ?The variables are 2-7/8" X 5" Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-223-3605 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231) or (Melvin.Rixse@alaska.gov). The information contained in this e-mail message is confidential information intended only for the use of the recipient(s) named above. In addition, this communication may be legally privileged. If the reader of this e- mail is not an intended recipient, you have received this e-mail in error and any review, dissemination, distribution or copying is strictly prohibited. If you have received this e-mail in error, please notify the sender immediately by return e-mail and permanently delete the copy you received. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. TRANSMITTAL LETTER CHECKLIST WELL NAME: PTD: 2-1 /moi ,Development Service _ Exploratory _ Stratigraphic Test _ Non -Conventional 7 FIELD: a{ LL I� f iKf POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are i also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool GRANITE PT, MIDDLE KENAI OIL - 280150 - Well Name: GRANITE POINT 55RD Program DEV Well bore seg ❑ PTD#:2191030 Company Hilcorp Alaska LLC Initial Class/Type DEV/PEND GeoArea 820 Unit 11954 On/Off Shore Off Annular Disposal ❑ Administration 1 Permit_fee attached_ - - - - NA 2 Lease number appropriate_ - - Yes Entire Well lies within ADL0018761----- - - - 3 Unique well -name and number - - - - - . - - - - - - - - - - - Yes ---- 4 Well located in_a-defnedpool- - - - - - - Yes Granite - Point Middle Kenai Oil Pool - 280150 5 Well located proper distance from drilling unit -boundary- Yes - - Conservation Order No. 76A, -issued May 20, 2019, -governs -Granite Point Middle Kenai Oil Pool._ - - - - - - - - - 6 Well located proper distance from other wells_ - - - - - - - - - _ - Yes - Rule 2, CO 76A: No well spacing restrictions, except that no oil well shall be completed_ ----------- - - - - 7within 7 Sufficient acreage available in drilling unit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - - . of an exterior property line where ownership or landownership changes._ As planned, well conforms - - - _ 8 If -deviated, is wellbore plat -included - - Yes with. spacing- requirem en_ts of C0 7.6A - - - - - - - - - - - - - - - - - - - 9 Operator only affected party- - - - - - - - - .. Yes 10 Operator has -appropriate bond in force - - - - - - - - - - - - Yes - - - _ _ 11 Permit_can be issued without conservation order_ _ - - - Yes - - - - - - - Appr Date 12 Permit can be issued without administrative -approval - - - - - - - - - - - - - - Yes ... - - - - - - - - - - - 13 Can permit be approved before 15 -day wait- Yes SFD 7/19/2019 - - - - - - - - - - - - - - - - - - - - - - - 14 Well located within area and_strata authorized by Injection Order# (put 10# in -comments)- (For NA_ 15 All wells -within 1/4 -mite -area -of review identified (For service well only) - - - - - - - NA_ - - - - - - - - - - _ - - - - - - - - - - - - - - - - - 16 Pre -produced injector: duration of pre production less than 3 months _(For service well only) N_A_ 17 Nonconven. gas -conforms -to AS31.05.030G.1_.A),0.2.A-D)... ----- _. - NA______________________ 18 Conductor string -provided - - - - - - _ NA- This is a redrill out of 9-5/8"_casing Engineering 19 Surface casing -protects all -known USDWs - NA_ This is a redrill out of 9! -5/8" -casing 20 CMT_ vol_ adequate_ to circulate on conductor & surf_csg - - - - -- . NA_ This is a redrill out of 9 -5/8" -casing - - - - - -- 21 CMT_ vol_ adequate -to tie-in long string to surf csg_ - - - - - - - - - Yes 7" liner -will- be fully cemented_ (using BAKER tools to -get liner in)_ 22 CMT -will coverall known_pro_ductive horizons- --- --- Yes 5"_production Liner will be fully cemented 23 Casing designs adequate for C, T, B &_permafrost-------------- - Yes 24 Adequate tankage -or reserve pit - - - - - - - - - - - - - - - Yes - - - - Spartan 151- platform is -ongoing- operations . 25 If_a_re-drill, has_a_ 10-403 for abandonment been approved - - - - - NA_ drillout of a surface. caisng shoe (existing) 10- 403 will abandon_ original PTD -- - - - 26 Adequate wellbore separation proposed_ - - - - - - - - - - - Yes Close crossing with GP-31-23_(will_shut in gas lift on this -well during drilling) - - - _ 27 if_diverter required, does it meet regulations_ - - - - - - - - - - - - - NA_ No diverter required, not -drilling surface hole_ - - - - - Appr Date 28 Drilling fluid program schematic & equip -list-adequate _ - - - - - Yes - - MGR 7/29/2019 29 BOPEs,_do they meet regulation - - - - - - - - - - - - - - - - - - - - - - - -- _ - - NA_ - - _ 13-5/8"-5M 3 ram_stack,_1-annular_ -- -- - - - - - 30 BOPE_press rating appropriate; test to (put psig in comments)_ - - - - - - - - - - Yes .. - MASP 2342 psi, Tested to 3500 psi - --- - 31 Choke -manifold complies w/API_RP-53 (May 84)- - - - - - - - - - - - - - - - - - - - - - - - - - Yes - - - - - - - Using- Alt MASP talc. - - - - - - - - - - - - - - . - _ _ - 32 Work will occur without operation shutdown- - ------ Yes Need sundry approval to complete well and perforate. - - - - - - - 33 Is presence of H2S gas probable _ _ _ _ _ - - - No- - - - - - - - - - - - - - 34 Mechanical -condition of wells within AOR verified (For service well only) - - - _ NA_ - - - - - - - This well is a producer, - - - - - - - - - - - - - - - - - - - - - - - - 35 Permit_ can be issued w/o hydrogen_ sulfide measures - - - - - _ - Yes - - - H2S is not expected._ Spartan- 1.51 has H2S sensors and alarms. Geology 36 Data ta_presented on. potential overpressure zones - - Yes _ _ - - .. Planned drilling mud program_ appears adequate to control operator's forecast pressure gradient. Appr Date 37 Seismic analysis of shallow gas -zones _ - -- NA_ - - - - - - - No abnormally geo-pressured strata _are anticipated. - - - - - - - - - - - SFD 7/19/2019 38 Seabed condition survey (if off -shore) NA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - _ _ _ - - - - - - _ _ - - - 39 Contact name/phone for weekly -progress reports- [exploratory only] NA - - - - - _ - - - Geologic Engineering Public Drilling well with Jackup rig Spartan 151 over the platform. GIs Commissioner: Date: Commissioner: Datel f Commissioner Date S `[3�1 ( r)� �f