Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
184-062
1a. Well Status: GINJ Oil 1b. Well Class: 5 Exploratory Service BP Exploration (Alaska), Inc 14. Permit to Drill Number/Sundry 184-062 5/2/1984 5/15/1984 GL PRUDHOE BAY, PRUDHOE OIL 4a. Surface: Top of Productive Interval: Total Depth: 780' FSL, 21' FWL, Sec. 11, T10N, R15E, UM 5178' FSL, 294' FWL, Sec. 11, T10N, R15E, UM 51' FSL, 328' FWL, Sec. 02, T10N, R15E, UM Surface: x- y- Zone -713298 5936820 ASP 4 11. Gas SPLUG 5Abandoned 20AAC 25.105 Suspended 20AAC 25.110 WINJ WAG WDSPL No. of Completions: 2/28/2020 15. 50-029-21109-00-00 16. PBU 03-27 Well Name and Number: 10228' / 8645' 28.28 17. TPI:y- Zone -713441 ASP 4x-5941224 Total Depth: x-y-Zone -713470 ASP 45941378 10825' / 9222' None DNR Approval Number:19. 74-017 5. Directional or Inclination Survey: Yes No Submit electronic and printed information per 20 AAC 25.050 (ft MSL) 20.Thickness of Permafrost MD/TVD: DIL / BHCS / GR / SP, LDT / CNL / GR / Cal, CNL / GR, CBL / GR / CCL, Gyro CASING WT. PER FT.GRADE SETTING DEPTH MD TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED Location of Well (Governmental Section): Field/Pool(s): Date Comp., Susp., or Aband.:6. Total Depth (MD/TVD): CASING, LINER AND CEMENTING RECORD TOP BOTTOM 22. SETTING DEPTH TVD 9-5/8" 7" 91.5# 72# 47# 29# L-80 L-80 34' 31' 3668' 10203' 10817' 34' 31' 3607'9214' 8621' 8-1/2" 12-1/4" 1850# Poleset 500 sx Class 'G', 300 sx CS I 340 sx Class 'G' 25. GRADE PACKER SET (MD/TVD) 26. 4-1/2" 12.6# 13Cr80 9992' 10320' - 10333' 10320' / 8734' DEPTH INTERVAL (MD)AMOUNT AND KIND OF MATERIAL USED PRODUCTION TEST27. Date First Production: Not on Production N/A Date of Test: Flow Tubing Press Oil-Bbl: Oil-Bbl: Gas-MCF:Water-Bbl: Oil Gravity - API (corr): Method of Operation (Flowing, gas lift, etc.): Gas-Oil Ratio:Choke Size: Water-Bbl: 10228' Open to production or injection?Yes No 524. If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): H-40 114'30"20" 13-3/8"33'2404'17-1/2"2000 sx CS III, 400 sx CS II33'2403' 9946' / 8376' Set Whipstock Gas-MCF: Production for Test Period Calculated 24 Hour Rate Hours Tested: Casing Press: 114' ACID, FRACTURE, CEMENT SQUEEZE, ETC. TUBING RECORD DEPTH SET (MD) Yes No 5Was hydraulic fracturing used during completion? Per 20 AAC 25.283 (i)(2) attach electronic and printed information ADL 028327 319-522 Other 12. SSSV Depth (MD/TVD): Ref Elevations BF 29.62 (attached) KB Form 10-407 Revised 3/2020 Sr Pet Eng Sr Pet Geo Sr Res Eng STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Development Stratigraphic Test 2.Operator Name: 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7. Date Spudded: 8. Date TD Reached: 9. 10. Plug Back Depth(MD/TVD): 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 62.00 Water Depth, if Offshore:13. N/A Zero API Number: Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary 23. 18.Property Designation: 21.Re-drill/Lateral Top Window MD/TVD: N/A 1900' (Approx.) 5 Submit within 30 days of Completion, Suspension, or Abandonment 01/ [&U By Samantha Carlisle at 11:02 am, Apr 01, 2020 DSR-4/1/2020SFD 4/1/2020MGR02APR02 Abandon Date 2/28/2020 HEW RBDMS HEW 4/3/2020 xG If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Permafrost - Base Formation at total depth: Contact Name:Sperry, Nathan Contact Email: Nathan.Sperry@bp.com Authorized Name:Lastufka, Joseph N Authorized Title:SIM Specialist Authorized Signature with Date:Contact Phone:907-564-4258 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. 5300' 7968' 9958' 10176' 10185' 10223' 10382' 10429' 10700' 10709' 4912' 6851' 8387' 8595' 8604' 8640' 8794' 8839' 9101' 9110' Ugnu Colville Mudstone HRZ Shublik Sag River Sadlerochit - Zone 4 CGL - Zone 3 Base of CGL - Zone 2 Zone 1 Base Sadlerochit - Kavik Kavik 28.CORE DATA Conventional Core(s) Yes No 5 Sidewall Cores Yes No 5 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. Well Tested? Yes 10709'9110' Top of Productive Interval Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment 30. FORMATION TESTS29. GEOLOGIC MARKERS (List all formations and markers encountered): NAME MD TVD Permafrost - Top No 5 31. Summary of Pre-Rig Work, Summary of Daily Drilling Reports, Wellbore Schematic DiagramList of Attachments: Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Joseph N Lastufka Digitally signed by Joseph N Lastufka Date: 2020.04.01 10:51:53 -08'00' ACTIVITYDATE SUMMARY 1/15/2020 ***WELL SHUT IN UPON ARRIVAL***(SLB ELINE - PRE RIG) DRIFT FOR WHIPSTOCK WITH 20' x 3.70" OD DUMMY WHIPSTOCK DOWN TO 10,250' LAY DOWN FOR NIGHT ***JOB IN PROGRESS - CONTINUED ON 16-JAN-2020*** 1/15/2020 T/I/O= 420/1250/500 Temp= Hot Assist E-Line w/ TBG & FL FP (CTD) Pumped 58 bbls crude down TBG, Pumped 3 bbls 60/40 spear followed with 95 bbls crude down FL for FP, Tags hung on well, DSO notified of well status, Valve position at departure- SV, SSV, WV, AL= Closed, MV= Open, IA & OA= OTG, FWHP= 400/1250/500 1/16/2020 ***JOB CONTINUED FROM 15-JAN-2020***(ELINE CALIPER) LOG PDS CALIPER 10,310-9,800'. LAY DOWN FOR NIGHT. ***JOB IN PROGRESS, CONTINUED 1-JAN-2020 WSR*** 1/17/2020 ***WELL FLOWING UPON ARRIVAL (SLB ELINE - SET WHIPSTOCK) SET 4-1/2" x 7" DELTA RETRIEVABLE WHIPSTOCK. TOP OF WHIPSTOCK AT 10,228'. ORIENTATION 1.5 DEG LOHS. CORRELATED TO DRESSER ATLAS CBL LOG DATED 18-MAY-1984 ***JOB COMPLETE. WELL SHUT IN ON DEPARTURE.*** 2/17/2020 T/I/O= /1123/1250/650 ( FP FL&TBG Pre CTD ) Pump 10 bbl 60/40 and 94 bbls crude DN FL, Pumped 5 bbls 60/40 and 48 bbls crude DN TBG , SV/WV/SSV =C , IA/OA= OTG Tree cap PTgood and OTG 2/22/2020 T/I/O=1300/1200/200. Pre CDR2. Set 5" FMC ISA BPV #538 @135". LTT Passed. RD 5x7 FMC upper tree. RU 5x7 CDR2 tree #10 and kill line #6. Torqued to API spec. PT to low 300psi and high 5000psi for 5 min ea. Passed. Pulled 5" FMC ISA BPV #538 @135". Job in progress. See log. Final WHP,s 1300/1200/200. 2/23/2020 T/I/O=1800/1800/200 Removed tree cap bonnet, installed Test Spool with tapped blind flange. Torqued to API specs. PT'd through kill line against Top of Master x bottom of Swab, Top of second Master x Bottom of Swab, and through tapped blind flange x Top of Swab, all to flat line criteria, pre CDR. see "Field Charted Tests" FWP's 1800/1800/200 see log for details. 2/23/2020 T/I/O=1320/1000/240. Temp=SI Load IA and TBG (CTD) Arrive on location, rig up and start pressure test. ***JOB CONTINUED ON 24-FEB-2020*** 2/24/2020 ***JOB CONTINUED FROM 23-FEB-2020*** Loaded the IA with 20 BBL's of 60/40, 204 BBL's of 1% KCL, and 110 BBL's of DSL. Loaded the TBG with 5 BBL's of 60/40, 284 BBL's of 1% KCL, and 58 BBL's of DSL. FP tags hung on the IA and MV. Final Valve Positions: SV/companion valves/WV = closed, TMV/BMV= open IA/OA = OTG. FWHP = 0/586/304. ***JOB COMPLETE ON 24-FEB-2020*** 2/24/2020 T/I/O = 10/630/260. Temp = SI. Bleed WHPs (Pre Rig). No AL, scaffold, or wellhouse. CDR tree installed w/ kill line. IA FL @ 1590' (71 bbls). OA FL @ near surface. Bled IAP from 630 psi to 18 psi (FTS) in 6 hrs. OAP decreased 10 psi. Bled OAP from 250 psi to 10 psi in 1 hr 20 mins. IAP increased 15 psi. Bled IAP from 33 psi to 25 psi in 10 mins. OAP increased 22 psi. No monitor. Final WHPs = Unk/25/32. MVs & Killl Line valves = C. IA, OA = OTG. 1810 hrs. Daily Report of Well Operations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ll depths reported in drillers depths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ll depths reported in drillers depths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ll depths reported in drillers depths** ! ! "#"!$!"% & '(' )& '(' 2 3 ! 4 '0&! 5)& ' +''*.6(*7 ! 4! 8 ! 4"!&!99:90 3"93*(( )5 58 4'!; </058=$; 7 % 4 (=* 1 & $58=% ) 8> & 8 =" 8#8 $% & 8 "3! 9@"!0&!99:!9! 139&!9#60/:C& 9 !!9"1"!3#&90 79,(#9?999## ?:! &93"&&9:3"# 7#9:#!#9!":!70 0**. ! 9 3#&9 "3"*(9#&09 '"K.9'++9 37*7#"! 37.*G<+0+701! +B-!&39: 139&"11!30 37(#9?999## ?:! 0* ! '6' 9 3#&"F& ""1#9?99!10 #3&"03!:7#""3" 9:!0 "07"#139& 0+70"3&"#1!0 "7"119 &939#"&&9:30 &?""1"!3#&9: &97"&90 !9:!"&39"91"!&97"& 0 0+ ! ) ***7'*'**All depths reported in drillers depths** ! ! "#"!$!"% & '(' )& '(' 2 3 ! 4 '0&! 5)& ' +''*.6(*7 ! 4! 8 ! 4"!&!99:90 3"93*(( )5 58 4'!; </058=$; 7 % 4 +=* 1 & $58=% ) 8> & 8 =" 8#8 $% & 8 9 3#&&97"& 37+"1*/&97"& 9<+0+7 371!#!<+0+7 37*(+60/:C& <+0+7 !9:!3!!" #&97"	!1 37+9"!10" !9!39:!"""9:! 0 !9:99&0"93"9!3 !""79!"#" 130 "1"!*#!0"9:"36#0 ++BC3J!3!3" 6/9 "#"&J!"9?"37 #3"-#979:9# "3&!"9!3!9 !3#9:7"!7B "939:!3!3-# 3"+*9#&!"&"69 #!&"39&!3! */B!3!393" L(/9#!&!"9:"11& "93&"&!""11 "#"&9!3!"# ""9#"! "*0+ 07-&939# 3D"&&37"#!&97"& 9 1!!3!9+6+9-9# "37"160/:73&-9#?" ##"*.(9 (&&*+"1&97"&" 9 37+"1*/&97"& 9<+0+7 371!#!<+0+7< ((9# 37*(+60/:C& <+0+7 *6B+0+7+/9 (99!#9:"" !1 #393"./99#*+"1 &97"&3#&B 6+#3&"379#+"1 &97"	&9-#K./9 &"B&9:"11 6#K9&"B &9:"11 !3!#&&""*99 *79-93"9!&"#"9 9:!3!"#9#9 "9:&97"&""1"! * #"3! 6(+**!3! 9#"&1"!* #!-"# #"&!3!3" :!&!3!"1/9 0./"#9?/9-#3&" /0+* ! ) ***7'*'**All depths reported in drillers depths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ll depths reported in drillers depths** 6WDUW $ THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Sean McLaughlin Engineering Team Lead - CTD BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 03-27 Permit to Drill Number: 184-062 Sundry Number: 319-522 Dear Mr. McLaughlin: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 w .aogcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, p Je . Price Chair DATED this ` uday of November, 2019. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 RECEIVE® Nf1V 1 9 min 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Chang r�Q�k6 fFi•❑ '�.,lJF�/ ®�;y 66,'�y❑ Plug for Redrill RI • Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other 2, Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development 0 5. Permit to Drill Number: 184A62 ' 3, Address: P.O. Box 196612 Anchorage, AK 6. API Number: 50-029-21109-00-00 99519-6612 Stretigrephic 11 Service ❑ 7. If perforating: B Well Name and Number: What Regulation or Conservation Order govems well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No m PBU 03-27 , 9. Property Designation (Lease Number): I 10. Field/Pools: ADL 028327 ' PRUDHOE BAY, PRUDHOE OIL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (8): Total Depth TVD(0): Effective Depth MD' Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 10825 9222 10394 8806 2461 10394 10366 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 34-114 34-114 1490 470 Surface 2371 13-3/8" 33-2404 33-2403 5380 2670 Intermediate 10172 9-5/8" 31-10203 31-8621 6870 4760 Production Liner 1 7149 7" 3668- 0817 3607-9214 8160 7020 Perforation Depth MD (0): Perforation Depth TVD (tt): Tubing Size: Tubing Grace: Tubing MD (ft): 1 10230.10357 8647 - 8770 5-1/2" 17# x 4-1/2" 12.6# 13Cr80 29 - 9992 110320 - 10333 Packets and SSSV Type: 4-1/2" Baker S-3 Packer Packers and SSSV MD (ft) and TVD (ff)'. 9946/8376 41/2• Baker FB -1 Packer 10320/8734 12. Attachments: Proposal Summary El Wellbore Schematic p 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch 21 Exploratory ❑ Stratigraphic ❑ Development m Service ❑ 14. Estimated Date for Commencing Operations: November 30, 2019 15. Well Status after proposed work: Oil. ` fI j ((tWINJ ❑ WDSPL ❑ Suspended m 16. Verbal Approval: Date: GAS ❑ (i('t WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is We and the procedure approved herein will not Contact Name. Sperry, Nathan be deviated from without prior written approval. Contact Email: Nathan.Sperry(abpcom Authorized Name: Mdaughlin, Sean M Contact Phone: 907-564-4258 Authorized Title: En eenng Tam Lead - CTD Authorized Signature: 'N—L Date: COMMISSION USE ONLY Conditions of approval: Notify Commission so that representative may witness Sundry Number: Plug �Iy1tegeerity ❑ BOP Test W Mechanical Integrity Test ❑ Location Clearance ❑ " 3S00PS/ Other/JOAGr-rF57-7? / -0 *1/d'.'.C�7tr' ZoAge- ps. �'PZ6Z) a-Aw';�+e�l✓��ce.•ce ✓9 �ra oec 1, Post Initial Injection MIT Req'd? Yes ❑ No ❑ / Spacing on Required? Yes ❑ No CP/ Subsequent Form Required:/Q,. Volt l \ Date., ` 16 1 Approvetl by: NQCOMMISSIONER COMMISSIONAPPROVED Date NO / Form 10403 Revised 04/2017 ORIGINAL ,,.,�.,� �6iQ�yfy Submit Form and Approved application is valid for 12 months from the date of approval. Attachments in Duplicate To: Alaska Oil & Gas Conservation Commission From: Nathan Sperry - CTD Engineer Date: November7,2019 Re: 03-27 Sundry Approval Request 0000 �1 Sundry approval is requested to plug off the 03-27 production as part of the drilling and completing the proposed 03-27A coiled tubing sidetrack. History of 03-27 03-27 was originally completed in 1984 and worked over in 2000. 03-27 has watered out and there are no additional wellwork options to improve the oil rate. Plan is to re-establish parent offtake ("250 bopd) from the parent location in the new well bore which will be isolated from the water. Proposed plan for 03-27A The sidetrack will be a -3175' horizontal CST that will kicks -out from the 03-27 parent. The CST will establish offtake in Zone 4B. The sidetrack will be drilled on or around February 2020. During pre -rig work it is proposed to set a 4-1/2" x 7" whipstock at a kickoff depth of -10228' MD and mill a 3.80" window. The rig will move in, test BOPS, kill the well, and drill into Zone 4B. The proposed sidetrack will be completed with a 3-1/4" x 2-7/8" 13Cr-80 solid liner and cemented in place. This Sundry covers plugging the existing 03-27 production via the liner cement iob or liner too oacker. if the liner lap pressure test fails (alternate plug placement per 20 AAC 25.1120)1. The following describes the work planned and is submitted as an attachment to Form 30-403. A schematic diagram of the current well and proposed sidetrack is attached for reference. Pre -Rig Work (scheduled to begin Nov 30`h, 2019) 1. S DMY GLVs, Drift for whipstock. Caliper liner. 2. EL Set Whipstock 3. F MIT -IA 4. C Mill Window _ 2 y ; r ,- <el 5. V Pre -CTD Tree work. J Rig Work (scheduled to begin Feb 2020) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2461 psi). 2. Drill production section: 4.25" OH 3. Run 3-1/4" x 2-7/8" liner to TD. 4. Pump primary cement job: 46.1 bbls, 15.3 ppg Class G, TOC at TOL (9940' MD)'. S. Freeze protect well to a min 2,200' TVDss. 6. Close in tree, RDMO. • Approved alternate plug placement per 20 AAC 25.112(i) Post -Rig Work: 1. V: Valve & tree work 2. SL/FB: Set LTP if needed. PT LTP. Set KO GLD. 3. E: Perforate Heel "'30' Nathan Sperry CC: Well File CTD Engineer Joe Lastufka 564-4258 PTb The sundry and permit to drill will be posted in the Operations Cabin of the unit during the window milling operation. Window Milling Fluids Program: • A min EMW of 8.4 ppg KCL (^'503 psi over -balance). KCI will be used as the primary working fluid and viscous gel sweeps will be used as necessary to keep the hole clean. • The well will be freeze protected with a non -freezable fluid (typically a 60/40 methanol/water mixture) prior to service coil's departure. • Additionally, all BHA's will be lubricated and there is no plan to "open hole" a BHA. Disposal: • All Class 1& II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. Hole Size: • The window and 10' of formation will be drilled with a 3.80" OD mill. Well Control: • BOP diagram is attached. • AOGCC will be given at least 24-hour notice prior to performing a BOPE function pressure test so that a representative of the commission can witness the test. • Pipe rams, blind rams, CT pack off, and choke manifold will be pressure tested to 250 psi and 4,000 psi. • BOPE test results will be recorded in our daily reporting system (Alaska Wells Group Reporting System) and will provide the results to the commission in an approved format within five days of test completion. • BOPE tests will be performed upon arrival (prior to first entry into the well) and at 7 days intervals thereafter. • 10 AAC 25.036 c.4.0 requires that a BOPE assembly must include "a firewall to shield accumulators and primary controls". A variance is requested based on the result of the joint hazop with the AOGCC. For our operation, the primary controls for the BOPE are located in the Operations Cabin of the Coiled Tubing Unit, and the accumulators are located on the backside of the Operations Cabin (opposite side from the well). These are approximately 70' from the well. Hazards: • DS 03 is an H2S pad. Recent recorded H2S reading on 03-27: 210 ppm on 5/27/2018. Max H25 recorded on the pad: 650 ppm. Reservoir Pressure: • The reservoir pressure on 03-27A is expected to be 3341 psi at 8800' TVDSS (7.3 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2461 psi. • Amin EMW of 8.4 ppg for this well will provide 503 psi over -balance to the reservoir. Nathan Sperry CC: Well File CTD Engineer Joe Lastufka 564-4258 TREE= FMC WELLHEAD= MCEVOY ACTUATOR = BAKER C OKB. ELEV = 62' BF. ELEV = PORT KOP= 2750' Max Angle = 46' @ 7400' Datum MD= 10450' Datum TVD= 88W SS, 113-3/6" CSG, 72#, L-80 BTC, D = 12.347" 1-1 2404' C 5-12" TBG, 17#, 13CR-80, .0232 bpf, D = 4.892' 3535' TOP OF 7-L 366W - Minimum ID = 2.80" @ 10330' 4-1/2" MILLED XXN PLUG TOP OF 7" LMR TBG, 12.6#, 13CR-80, .0152 bpf, D = 3.958" —I 9992' } 9-5/8" CSG, 47#, L-80 BUTT, r.)=8.681 -H-10203- TOP OF 4-12" TSG 10320' PERFORATION SL WMARY REF LOG: BRCS ON 05/15/84 ANGLE AT TOP PERF: 15 @ 10224' Note: Refer to Production DB for historical cert data SEE PAGE FOR PERFORATION DATA 7' LMR, 29#, L-80,.0371 bpf, D = 6.1 03-27 FSAFFNOTES: 4-12" 8:5-1/2" CHROME TBG"' 15-12" X 4-12" XO, D = 3.958" 1 GAS LFT MANDRELS ST MD TVD DEV TWE VLV TC PORT DATE 1 3882 3796 28 CA-KBG-2-LS DOME NT 16 07!30/19 2 6472 5786 42 CA-KBG-2-LS SO NT 20 07/30/19 3 7760 6704 46 1 CA-K8G2-LS DMY M 0 07/31/10 4 8713 7380 43 1 CA-KBG2-LS DMY NT 0 07/31/10 5 9708 8160 27 1 CA-KBG-2-LS DMY NT 0 07/31/10 1 9992' 1-14-12" WLEG, D=4.00" 9966' ELMD TT LOGGED 10/11/00 10330' j4-1/2" HES XN NP, MLLEDTHRU XXN RUG w /2.80' MLL (03/31 /16) 103{-14-112" WLEG, D=4.0" 10331' ELMO TT NOT LOGGED 10366' CTM FISH: OD x A4' LONG ILL HANDS) DIAMOND PARABOLIC MILL SEE PICS N WELLS FOLDER (0327116) 10394' TOPOFCEvE1T DATE REV BY C(AVVENTS DATE REV BY COMMENTS 05/21184 ORKMAL COMPLETION 0428/16 CJS/JMD EDITS TO NELED XXN PLUG (031311 0420100 LAST WORKOVER 0428/16 CJS/JMJ ADPERFS 26/16 05104/15 RCT/JMD GLV CIO 0427/15 05/31/16 TBD/JMD GLV C/O 0527/16 OM106M5 JLS/JMD REMOVED SAND (08/16115) 0629/16 JMD PRE -RIG CLEAN LP 09108/15 SAVJIVU ADDED XXN PLUG FROM 2001 09/17/18 ZV/J1vD CIV C/O D9/16118 04105/16 JTC/JMD MILLED PLLGSET FISH (3/27116) 08101/19 JPK/JMD GLVC/0(071J0/19) PRL IDHOE BAYIAJIT WELL 03-27 PERMT No: 1840620 API No: 504)2921109-00 BP Exploration (Alaska) 03-27 PERFORAMN SUNUARY REF LOG: BHCS ON 05/15184 ANGLE AT TOP PERF: 15 @ 10250' Note: Refer to Production DB for historical pert data SIZE SPF WTERVAL Opn/Sgz DATE 3-1/8" 4 10224 - 10262 S 0425/88 3-3/8" 6 10230 - 10250 O 04/26116 3-3/8" 6 10250 - 10280 O 03/13/01 2-1/8" 4 10250-10282 O 10/18/94 2-1/8" 4 10270-10282 S 01/15/89 2-1/8" 6 10270-10282 S 06119/92 2-12" 4 10270-10282 S 06/19/92 2-1/2" 4 10270 - 10282 S 10114/94 2-1/2" 4 10266-10292 S 10/14194 2-1/8" 4 10286 - 10308 O 10/18194 3-3/8" 6 10290 - 10318 S 04/25/88 2-1/8" 4 10290-10318 S 01/15/89 2-1/8" 6 10290-10318 S 06/19/92 2-12" 4 10290 - 10318 S 06/19/92 2-12" 4 10298 - 10310 S 10/14/94 2-1/2" 2 10350-10360 S 10/14/94 2-1/2" 6 10350 - 10355 O 04/25/16 2-12" 6 10352-10357 O 04/25/16 2-12" 4 10368 - 10378 S 06/19/92 2-1/2" 2 10381 - 10398 S 10/14/94 2-12" 4 10388-10398 S 06/19/92 3-318' 1 10503 - 10578 S 0425/68 3-3/8" 1 10547 - 10569 S 04/25/88 13-3/8"1 1 1 10588 - 10602 S 0425/88 PRUDHOE BAYUNfT f VVELL: 03-27 840 PERMIT No: 1620 API No: 50-02921109-00 SEC 11, Ti OR R15E, 780' FSL & 21' FItiL DATE REV BY COMnENTS DATE I REV BY I COMMENTS 0527/84 ORIGN4AL COMPLETION 0428/16 1 CJS/AU EMS TO MILLED XXN PLUG 03131/1 042M LAST VVORKOVER04/28/16 CJSIJM7p ADPERFS (0425-2616) 05104/15 RCTYJMD GLV Cb /15 05/31/16 78DIJMD GLV C/O 0527/18 09/08/15 JLS/JM) FEMOVED SAND (08/16/15) 0629!16 JMD PRE -RIG CLEAN UP OWWl5 SVYUJIVE ADDED XXN PLUG FROM 2001 09/17/18 2V/JMD GUV C/O 09/16/18 BP Exploration (Alaska) 04/05116 JTC/JMD MILLED PLUGSET FISH (327116) 0&01/19 JPK/JMD GLV CIO (07rMl9) VYaLFFAD= MCEVOY ACTUATOR= DEV OKB. ELEV VLV BF. E LEV = PORTMDATE1 KOP= 2750' Max Angle= _"@—' Datum MD= _ Datum TVD= 88W SS PROPOSED 13-3/8- UbU, /29, L -6U B I L, ID = 1'1.:14 / —L 24U V 5-1/2' TBG, 17#, 13CR-80, .0232 bpf, D = 4.892" 3535' TOP OF 7"LNR 3668• Minimum ID = _" @ 7- SCAB LNR, 29#, N -80/L-80,.0371 bpf, ID = 6.184" – 989W TOP OF 7" LNR 9890' TOP OF 3-1/2' X 3-1/4' X 2-7/8' LNR 9940 15-12" HES X NIP, ID = 4562" 19-5/8" X 7" HGR w /TEBACK SLV, D = 6.184" I GAS LFT MANDRELS ST MD TVD DEV TYPE VLV DATE I SOZ PORTMDATE1 06129/16 JMD BULTPROPOSED 3882 3796 28 CA-KBG-2-LS DONE INT 16 2 6472 5786 42 CA-KBG-2-LS SO NT 24 3 7760 6704 46 CA-KBG-2-LS DMY INT 0 4 8713 7380 43 CA-KBG-2-LS DMY INT 0 5 9708 8160 27 CA-KBG-2-LS DMY NT 0 9890' 9-5/8' X 7- BOT SHORTY HYDRAULIC HGR 9940' 3.70' DEPLOY SLV, D=3.00' 3-1/2' _ X NIP, D = 2.813' 9946' 7" X 4-1/2" BKR S-3 PKR, ID = 4.00' 9970' 4-1/2' HES X NIP, ID = 3.813" BEHIND CT LNR 9992' 9992' 4-12" WLEG, D = 4.00" BEHIND CT LNR 9966' ELMD TT LOGG®10/11/00 _#, L-80 STL, 10190' 3-1/2" X 3-71/4- XO. ID = 2.786" D = 2.992" n RI ITT ID = 7' BKR DELTA WHIPSTOCK (XX/XX/XX) 1y 10228' 7' LNR, 29#, L$0, .0371 bpf, D = 6.184" -•10228' PE7FORATION SUMMARY REF LOG: —ON XX/XX/XX ANGLE AT TOP PEW. °@' Note: Refer to Production DB for historical pert data SIZE SPF IMH2VAL OpNSgz DATE I SOZ CTD (03-27A) 06129/16 JMD BULTPROPOSED 08/14/19 TWJMD BUILT CURRENT PROPOSED 6.6#, L$0 TCl1, .0079 bpf, ID = 2.85' PBTD — 2-718' LNR, 6.5#,13 -CR STL, .0058 bpf, ID = 2.441' 13403' MILLOUT WINDOW (03-27A)'-' 10440' 3-114" X 2-7/8" XO, ID = 2.377" DATE REV BY COMMENTS DATE REV BY COMMENTS 0521184 ORIGINAL COMPLETION 0420/00 LAST WORKOVER ii CTD (03-27A) 06129/16 JMD BULTPROPOSED 08/14/19 TWJMD BUILT CURRENT PROPOSED PRUDHOE BAYUNIT WELL: 03-27A PERMIT No: _ API No: 50-029-21109-01 BP Exploration (Alaska) I I I I jManifolda� Chok I I E I I ._._._.i _._._._._._._.--- C PUNP SL_ CT M � I I>oume Watzr Tank Farm_ I I i I II I I I I L__. CoBed Tubing Urlt _ _ ......... _ , Well Bighoie CDR2-AC 4 Ram BOP Schematic Date 21-NOV-17 Quick Test Sub to Otis 1.1 ft Top of 7" Otis ==Elp—.—.—.—.—.—.—.-- —.—.—.—.—. f-CDR2 Rig's Drip Pan Distances from top of riser Excluding quick -test sub �- 7-1116" 6k Flange X T' Otis Boa Top of Annular 6.0 ft ydril 7 1/16 Top of Annular Element 6.7 ft Annular Bottom Annular 8.0 ft C6 Blind/Shears0. 7B1B2 2-3/8" Pipe/Slips 10.1 ft B3 B4 Kill Line Ci 2-318" x 3-1/2" VBRs 12.6 ft Ci 2-318" Pipe/Slips 13.4 ft CL of Top Swab 16.0ft Swab Test Pump Hose , T7 i T2 CL of Flow Cross 17.4 ft �� Master CL of Master 18.8 ft LDS O 91g- IA OA LDS Ground Level 0 Sundry Application Plug for Re -drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re - drilled. Those wells that are not re -drilled immediately are identified every 6 months and assigned a current status of "Suspended." Task Responsible The initial reviewer will check to ensure that the "Plug for Redrill" box Geologist 7te in the upper left corner of Form 10-403 is checked. If the "Abandon" or j "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Geologist work) the initial reviewer will cross out that erroneous entry and initial then / it on both copies of the Form 10-403 (AOGCC's and operator's copies). V Instead, check the "Suspended" box and initial that change. Drilling Engineer The drilling engin@ers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re -drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding" user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. • • PTv /64_06,z, Loepp, Victoria T (DOA) From: Lastufka,Joseph N <Joseph.Lastufka@bp.com> Sent: Wednesday,January 11, 2017 9:44 AM To: Loepp, Victoria T(DOA) Subject: FW:03-24B and 03-27A BOP Schematics Attachments: CDR2 Bighole BOP Stack.xls Follow Up Flag: Follow up Flag Status: Flagged Victoria, Please see attached new BOP sketch for 2 wells that sundries were approved with a previous BOP. 03-24A (PTD# 198-006, sundry#316-611) (303-27 (PTD# 184-062, SUNDRY#316-621) The BOP will also be needed for the approved PTD for 03-24B and 03-27A. If you have any questions or need additional information, please let me know. Thanks, Joe From: Browning, Zachary H SeLastufka,Wednesday, Joseph Nuary 11, 2017 9:40 AM To: % NaED APR 2 8 Ztlll' Subject: 03-24B and 03-27A BOP Schematics Joe, See the following BOP schematic attached which is accurate for both wells. Thanks, Zach Browning 2 CTD&RWO Engineer BP Alaska 0: (907)564-5220 C:(907)351-7941 Zachary.browning@bp.com Sometimes you must sacrifice the good,to achieve what is great. 1 Well Blank óDR2AC BOP Schematic .ate Quick Test Sub to Otis IITop of7"Otis 0.Oft -* CDR2 Rig's Drip Pan 11111 Distances from top of riser = Excluding quick-test sub III Top of Annular 7.1/1b^bk Flange X 7'Otis Box Hydril 7 1/16" Top Annular Element 0.7 ft Annular Bottom Annular 2.0 ft ► ". 19"rt Blind/Shear CL Blind/Shears I 3.3 ft I ►4 1 2-3/8 Pipe/Slips xx CL 2-3/8"Combi's 4.1 ft ► 1 B6 ' .. "" :7 B8 Deployment Line ."m r'-►`4 .u a sk1Mud >�:1. �I" Eli oil �� z , cross ba II II Choke Line 3"Pipe/Slips CL 3"Pipe/Slips 6.6 ft to., .4 2-3/8"x 3-1/2"VBR CL 2-3/8"x3-1/2"VBRs 7.4 ft ► look. 81 I B2 B3 I 84 Choke Line Kill Line 11 `- / 7 ' 1 A :1•1111.1111111111 liaw4167 illb. NI Blind/Shear Ill CL Blind/Shears 10.0 ft ► 4 2-3/8"Pipe/Slips iri CL 2-3/8"Combi's 10.7 ft N. si ....a I ♦ • CL of Top Swab 13.3 ft tel.� �-�Swab 2 Test Pump Hose A./Swab 1 CL of Bottom Swab 14.8 ft w�i7 T1 T2 CL Flow Tee 16.2 ft1 . •�• = BOP2 CL of SSV 17.5 ft ii _ i Master 2 Fusable CL of Master Valve BOP1 lip. r4db.- Master 1 LDS ---►._ 17.4 11 I1 1 1I AMR II 11 II II II Gound Level OA .II1 II 11 a II II • • ,or TR �.e �\�//7,-v� THE STATE Alaska Oil and Gas 7 Of TAS Conservation Commission AL f£=_= 333 West Seventh Avenue 'V2 GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 op sip` Fax: 907.276.7542 www.aogcc.alaska.gov John Egbejimba �. 17, Drilling Supervisor SCkNNE�t ��' BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 03-27 Permit to Drill Number: 184-062 Sundry Number: 316-621 Dear Mr. Egbejimba: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster Chair DATED this /ay of January, 2017. RBDITS Z 5 2017 STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMN • APPLICATION FOR SUNDRY APPROV S 20 AAC 25.280 1. Type of Request: Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Repair Well ❑ Operations shutdown 0 Suspend ❑ Perforate ❑ Other Stimulate 0 Pull Tubing 0 Change Approved Program 0 Plug for Redrill 0 ' Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 184-062 Exploratory 0 Development j� 3. Address: P.O.Box 196612 Anchorage,AK 6. API Number: 50-029-21109-00-00 • 99519-6612 Stratigraphic 0 Service ❑ 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes 0 No IZ1 PBU 03-27 , RECEIVED 9. Property Designation(Lease Number): 10. Field/Pools: DEC �O�C ADL 028327 PRUDHOE BAY,PRUDHOE OIL 844L7 U 11. PRESENT WELL CONDITION SUMMARY 7 Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth ND: MPSP(psi): / Plugs(MD): J (C 10825 • 9222 ' 10394 8806 2376 ✓ 10394 10366 Casing Length Size MD ND Burst Collapse Structural Conductor 80 20" 35-115 35-115 1490 470 Surface 2373 13-3/8" 34-2406 34-2406 4930 2670 Intermediate 10172 9-5/8" 32-10204 32-8621 6870 4760 Production Liner 7149 7" 3668-10817 3607-9214 8160 7020 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 10230-10357 8647-8770 5-1/2",17#x 2.66##12.6# 1 /4-1/2",12. 13Cr80/13Cr80 30-9992/10320-10333 Packers and SSSV Type: 4-1/2"Baker S-3 Packer Packers and SSSV MD(ft)and TVD(ft): 9947/8377 4-1/2"Baker FB-1 Packer 10320/8734 12.Attachments: Proposal Summary ® Wellbore Schematic 0 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch IZI Exploratory 0 Stratigraphic 0 Development IZI - Service 0 14.Estimated Date for Commencing Operations: January 5,2017 15. Well Status after proposed work: Oil 0 WINJ ❑ WDSPL 0 Suspended WI 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG ❑ Commission Representative: GINJ 0 Op0 ShutdownAbandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Tempel,Joshua be deviated from without prior written approval. f Seo.,k McL4, c ,�'1'1 ,t-- Email Joshua.Tempel@bp.com Printed Name John Egbejimba ✓ Title Drilling Supervisor Signature ` Phone +1 907 564 4139 Date ( 211 I 6 S ONLY COMMISSION USE Conditions of approval:Notify Commission so that a representative may witness Sundry Number: Plug Integrity 0 BOP Test tn7 Mechanical Integrity Test 0 Location Clearance 0 i-ICE 1 i4114 c' Other: 5 -i-c. -/- -to '5 ' 7 5 v �}nry viol rr p�rvci frr ±r td z5�v ��st lace- ,v1,--v11 �rRr-0✓C. d A'l t Crk fc p 5 pcv- 2,0A-A-c z - nz L Post Initial Injection MIT Req'd? Yes 0 No J/ Spacing Exception Required? Yes 0 No Li Subsequent Form Required: /d —Z./ t 7--- o APPROVED BYTHE Approved by: L7g7 vi-L. *--- COMMISSIONER COMMISSION Date:/_�_/7 v7-t_ R I C I NA L RBDMS V- i L t) jdi, Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate /Jfzo/e , ,_ (z.,,y, • • To: Alaska Oil & Gas Conservation Commission From: Josh Tempel b p CTD Engineer Date: 14 December 2016 Re: 03-27 Sundry Approval Sundry approval is requested to plug the 03-27 perforations as part of the drilling and completion of proposed 03-27A coiled tubing sidetrack. History and current status: 03-27 was drilled and completed in May-1984 and worked over in April 2000. The well is no longer competitive due to high watercut, and has no future wellwork options. The well has passed integrity and is fit for a sidetrack. Proposed plan: 03-27A will be drilled from well 03-27 by the Nordic 2 Coiled Tubing Drilling rig on or around Feb 15th, 2016. The 03-27A sidetrack will exit through the existing 7" liner and kick off in the Ivishak, targeting Ivishak reserves. The proposed sidetrack is a—2,610' horizontal Ivishak producer targeting unswept reserves between-injection sweeps. The lateral will be completed with a 3-1/2"X'3- 1/4" (2-7/8" as contingency) l3Cr-85 liner which will be fully cemented and perforated. This Sundry covers plugging the existing 03-27 perforations via the 03-27A primary liner cement job and a liner top packer if the liner lap pressure test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. Co ai' i,t/o�fr., �� C?<' �Gf ("�oawCPt, Chi U feu/fir i�S/S / ro°0"el 9n✓��T y R ter Cv* fhb /?/ '7946 and Tro��� (co- 2a) B4/ -rife „.,elf �1�f t44 q�� re/44,/,,'4/ ut,'/t ry 't , t 5 C6/1Ie.4-r f oCet�1 1/ f4c'/°' ow for r rq rovvc' Ie e'voi j, 17044 14, for-T-1'04 0f rite d ��/�� 1111 Pre-Rig Work(scheduled to begin January 5th,2017) 1. E Set Plug in 4-1/2"tubing 10,325' MD, Set Whipstock 2. S Install Generic GLVs 7. V Set BPV 9. 0 Remove wellhouse and level pad -rby5� Rig Work(scheduled to begin February 15th'2017) 1. MIRU and test BOPE 250 psi low and 3,500]high. (MASP 2,376 psi)" 2. Mill 3.80"window and 10' of rathole. Swap well to drilling mud. 3. Drill build: 4-1/4" OH,233'(35 deg DLS planned). 4. Drill lateral: 4-1/4" OH,2,370'(12 deg DLS planned). \1\( N .cw 5. Run 3-1/2"x 3-1/4"X 2-7/8" 13Cr-85 liner leaving TOL at 9,965'MD. T--P 6. Pump primary cement job: 32 bbls, 15.3 ppg, final TOC at TOL* 7. Run cased hole log. 8. Run guns and perforate—500' 10. Freeze protect well to 2,500'MD. 11. RDMO. Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. Test liner lap and set liner top packer with slickline if test fails. Test packer if set. 3. ASRC flowback/well test Josh Tempel CTD Engineer 564-4578 / 891-5930 CC: Well File Joe Lastufka TREE= FMC WELLHEAD= MCEVOY III 03-27 S(NOTES: 4-1/2"&5-1/2"CHROME TBG' ACTUATOR= BAKER C OKT3.a.EV= 62' BF.aEV= ' ' KOP= 2750' ,1 Max Angle= 46°@ 7400' Datum MD= 10450' I I 2193' H5-1/2"HES x PP,D=4.562" Datum TVD= 880(7 SS 13-3/8"CSG,72#,L-80,D=12.347" —1 2404' 5-1/2"TBG,17#,13CR-80,.0232 bpf,D=4.892" H 3535' \ / 3535' H5-1/2"X 4-1/2"XO TOP OF 7"LNR —1 3650' CAS LFT MANDRELS Minimum ID = 2.80" @ 10330' ST MD TVD DEV TYPE VLV ATC PORT DATE 4-1/2" MILLED XXN PLUG !I 1 3882 3796 28 CA-KBG-2-LS DOME PIT 16 05/27/15 2 6472 5786 42 CA-KBG-2-LS SO M 24 05/27/15 3 7760 6704 46 CA-KBG-2-LS DMY NT 0 07/31/10 7"SCAB LNR,29#,L-80,.0371 bpf,D=6.184" H 9887' 4 8713 7380 43 CA-KEG 2-LS DMY NT 0 07/31/10 5 9708 8160 27 CA-KBG-2-LS DMY Nr 0 07/31/10 TOP OF 7"LNR --1 9887' E g 9946' _—I 7"X 4-1/2"BKR S-3 PKR D=4.0' I I 9970' —4-1/2"HES X MP,D=3.813" 4-1/2"TBG,12.6#,13CR-80,.0152 bpf,D=3.958" H 9992• 9992' --I4-112"WLEG,D=4.00" 9-518"CSG,47#,L-80,D=8.681" H 10203' A i 0 9966' --I M0 TT LOGGED 10/11!00 0 ■ TOP OF 4-1/2"TBG H 10320' X 10320' HT X 41/2"BKR FB-1 R<R 4 • 10330' H4-1/2"FES XN MP,MILLED TI-RU XXN PLUG w/2.80'MIL(03/31/16) 4-1/2-TBG,12.6#,13CR-80,.0152 bpf,D=3.958" H 10333' ' 10333' H4-1/2"WLEG,D=4.0" PERFORATION SUMMARY II 10331' -I a.MD TT NOT LOGGED REF LOG:BRCS ON 05/15/84 ' ANGLE AT TOP RIC: 15 @ 10224' Note:Refer to Production DB for historical perf data 10366'CTM=FISH:BOT 2.80"OD X.44'LONG LEFT SIZE 1 I SPF 1 NTH VAL I Opn/Sgz 1 DATE HANDED DIAMOND PARABOLIC MILL SEE RCS N 1MRLS FOLDER(03/27/16) SEE PAGE 2 FOR PERFORATION DATA 10394' H TOP OF CEMENT 1 I I I i1i1iff.'ff 1111111 10503' H TOP OF SAND I I I] PBTD H 10773' rt 111111 7"LNR,29#,L-80,.0371 bpf,D=6.184" H 1081T A1A1A1a.1..1.1: DATE REV BY, CONSENTS DATE REV BY COMMENTS FRI.AHOE BAY UNIT 05/21/84 ORIGINAL COMPLETION 04/28/16 CJSIJND BITS TO MILLED XXN PLUG(03/31/1 WELL 03-27 04/20/00 LAST WORKOV ER 04/28/16 CJS/JMD AD( FS(04/25-26/16) PERMIT No:'1840620 05/04/15 RCT/.MMD GLV C/O(04/27/15) 05/31/16 TBD/JM)GLV C/0(05/27/16) AR No: 50-029-21109-00 09/08/15 JLS/JM)REMOVED SAND(08/16/15) SEC 11,T1ON,R15E,780'FSL 8 21'F1AIL 09/08/15 SWCJJNC ADDS?XXN PLUG FROM 2001 i 04/05/16 JTClJND MLLE)PLUG/SET FISH(3/27/16) BP Exploration(Alaska) ! 03-27 • 1 1LI PERFORATION SUMMARY REF LOG:BHCS ON 05/15/84 ANGLE AT TOP PERF: 15 @ 10250' Note,Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-1/8" 4 10224- 10262 S 04/25/88 3-3/8" 6 10230-10250 0 04/26/16 3-3/8" 6 10250-10280 0 03/13/01 -- 2-1/8" 4 10250-10282 0 10/18/94 2-118" 4 10270-10282 S 01/15/89 Z C,.. 2-1/8" 6 10270- 10282 S 06/19/92 2-1/2" 4 10270- 10282 S 06/19/92 2-1/2" 4 10270- 10282 S 10/14/94 2-112" 4 10286- 10292 S 10/14/94 2-1/8" 4 10286- 10308 0 10/18/94 3-3/8" 6 10290- 10318 S 04/25/88 2-1/8" 4 10290- 10318 S 01/15/89 . ., 2-1/8" 6 10290- 10318 S 06/19/92 2-112" 4 10290- 10318 S 06/19/92 a 2-1/2" 4 10298- 10310 S 10/14/94 50 2-1l2" 2 103 - 10360 S 10/14/94 ll 2-1/2" 6 10350- 10355 0 04/25/16 2-1/2" 6 10352- 10357 0 04/25/16 g 2-1/2" 4 10368- 10378 S 06/19/92 pi pr 2-1/2" 2 10381 - 10398 S 10/14/94 2-1/2" 4 10388- 10398 S 06/19/92 3-3/8" 1 10503- 10578 S 04/25/88 3-3/8" 1 10547- 10569 S 04/25/88 3-3/8" 1 10588- 10602 S 04/25/88 Ilikr *441144*1�1�•1•4 44414116114 II ►!a�i�a.4114.�i!� DATE REV BY COMMENTS I DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/21/84 ORIGINAL COMPLETION 04/28/16 CJS/JMD EDITS TO MILLED XXN RUG(03/31/1 WELL 03-27 04/20/00 LAST WORKOVI32 04/28/16 CJS/JMD ADPERFS(04/25-26/16) PERMT No:'1840620 05/04/15 RCT/JMD GLV C/O(04/27/15) 05/31/16 TBD/JMD GLV C/O(05/27/16) API No: 50-029-21109-00 09/08/15 JLS/JMD REMOVED SAND(08/16/15) �~ SEC 11,T1 ON,R15E,780'FSL&21'FWL 09/08/15 SWC/JMC ADD®XXN RUG FROM 2001 04/05/16 JTC/JMD MLLE RUG/SET FISH(3/27/16) BP Exploration(Alaska) TRIS_ -- WELLHEAD: MC EVOYIIIS f NOTES: W ELL ANGLE>700 @__ ACTUATOR= PROPOSED 03-27A 'CHROME TBG&Mr MAX DES: OKB.ELEV= 62' _w_ BF.ELEV= I KOP= _ 2750' ' ' 2193' —I5-1/2"HES X NP,D=4.562" Max Angle= @ LI Datum MD= 1V Datum ND= 8800'SS /41 13-3/8"CSG,72#,L-80 BTC,ID=12.347" — 2404'_/__/\ / - 3535'_I--15-1/2"X 4-1/2"XO,D=3.958" 5-1/2"TBG, 17#,13CR-80,-0232 bpf,D=4.892" --I 3535' .-I TOP OF 7"LNR — 3668' 27-13668' H9-5/8"X 7"hi(;R w/TIEBACK SIV,D=6.184" GAS LFT MANDRELS Minimum ID = " @ . ST M) IVD DEV TY FE VLV ATC FORT DATE Li 1 3882 3796 28 CA-KBG-2-LS DOME INT 16 05/27/15 2 6472 5786 42 CA-KBG-2-LS SO INT 24 05/27/15 3 7760 6704 46 CA-KBG-2-LS MY INT 0 07/31/10 4 8713 7380 43 CA-KBG-2-LS DMY INT 0 07/31/10 7"SCAB LNR 29#,N-80/L-80,.0371 bpf,D=6.184" H 9890' 5 9708 8160 27 CA-KBG-2-LS MY INT 0 07/31/10 TOP OF 7"LNR — 9890' L------_` 9890' H9-5/8'x r BOT SHORTY HYDRAULC HGR _Z 9946' --17*X 4-1/2"BKR S-3 PKR,D=4.00" ITOP OF 3-1/2"X 3-1/4"X 2-7/8"LNR H 9966' I 1--13.70"DEPLOY SLV,D=3.00" tell 9970' J-14-1/2"HES X NP,D=3.813"BEFIIPM CT LNR r 9976' H3-1/2"_XMP,D=2.813" 4-1/2"TBG, 12.6#,13CR•80,-0152 bpf,D=3.958" — 9992' / \ - I 9992' 4-112"WLEG,D=4.00"BEHIND CT LNR] 9966' —{SMD TT LOGGED 10/11/00 3-112"LNR #,1-80 STL. —{ 10190' _ ___,_.._ 10190' H3-112"X 3-1/4"XO,D=2.786" .0087 bpf,D=2.992" 9-5/8"CSG,47#,L-80 BUTT,D=8.681" —I 10203' —4 111. • 10233' 7"M1A RKER JT 4-1/2"X 7'BKR DELTA WtFSTOCK(XX/X)UXX) --I 10240'R D f 1 17'LN29#,L-80,.0371 bpf, =6.184" I—I —10240' `j' 7"FALLOUT WIIDOW(03-27A) '- -- PERFORATION SUAIMARY REF LOG: _ON XX/XX/XX H PUP JT w/RA TAG ANGLEAT TOP FERE:*fp' I Note:Refer to Production DB for historical perf data SEE SFF P TERVAL Opn/Sgz DATE SQZ i 12250' H3-1/4"X 2-7/8"XO,D=2.377" 1 I HR PJTw/RA TAG I3-1/4'LNR,6.6#,L-80 TC11,.0079 bpf, 11)=2.85" I 122530' MID — 2-7/8"LNR,6.5#,13-CR TH511,.0058 bpf,ID=2.441" —I 12860' DATE REV BY COMvENTS DATE REV BY COMvENTS PRUDHOE BAY [NT 05/21/84 ORIGINAL COMPLETION _ WELL 03-27A 04120/00 LAST WORKOVER FE2MT No: t /_ CTD(03-27A) AR No: 50-029-21109-0, 06/29/16 JMD BUILT PROPOSE? SEC 11,T1 ON,R15E,780'FSL 8 21'FWL BP Exploration(Alaska) III I tow1 I 1 0'i m m 9i, 1 �4 o m m I _ s s 111 0fll l II\. m_ 1 �" -•:, _ II S 2 �I— II I a I r� I 1:1 la / R 3 m 1. " m + 4 . t'"�tl I \\ m m p c y w_ t p o +,* m m %$fir 1 Ilam.. rrrr w g L i i I // aria r i I �r >ex • I 11 Q 9 S MI I 11CC 1 1 0 ft 0 1 I a • a • 4 V1 Zo prr,l p C 0 ,`1.X \ I H - 2 C l ■■ of„alsng sep_ •i i vis a % i \ . . I p 1 n 1 _ I ( . i 1 1 �\ \ s 1 I J 111;611111111s $ I 1 _ \ \ 'ii - I Lu- \ ,.• °a 1 �� \ I Ne4i, i W ;SS' I Z 1 0 , • . �• �_ = \., \ p I 1 N s / x v \ ►. 1 Y. II Z ar 0 -' ” Il q-♦ v v 1 U Q F1-- i, / / i I;n 0' o ,g INT- -- p p J slo Z a "11 -'+ a: .- a . a 1 Z p I ,E m p " o s z3 LL U I.* I Eill F, V F,- F€ I 22 x .I I I s gE• 1 x 1 x n . • • l P-I 0 N Produced Gas (Thousand Cubic Feet ("MCF") per Day) or Gas-Oil Ratio (MCF per Barrel) 0 O O O O O O ,, 0 0 0 0 0 0 0 vio .. o .4 e O p M M N N .-I .i .. O rp r 9l✓ 41' to ._.�_._....... - J0. o ccr7 to ci �";, �4 4// +-' fC ---r ll to c 0 O. N0 -------1_ oI. to -0 a` O ca �' 6 to a d V c yn ot� oy00 O 0 U �7 , _o0 NMC " is o a, CV c M � ---' %O -o > 18M �o, to a CIto a _ ; - C �- °° • Z OC ° o ... 00� to I C U v O -c3 0 _ --- 6 l o 6 o a :� v - < _ O. N PG(i, c p CO 1 O 0 `6�a to o °% O Or 3 W CI' E 96; o 0 00_ 1:3 O U U - g P�l o f-- 0.0 dA 6J o H to ii I _ 6 �0 fa �l v 6% o ec 110 I � • • Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill"box Geologist in the upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend"boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon"box is checked in Box 15 (Well Status after proposed Geologist work) the initial reviewer will cross out that erroneous entry and initial then" v it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, check the "Suspended" box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding"user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. Date:07/15/2016 0 . « Transmittal Number:0102 iGHT PLACE p <, DATA LOGGED ,11/201 0 ,i. K.BENDER GYRODATA SURVEY TRANSMITTAL RECEIVED JUL 1 s 2018 State of Alaska - AOGCC Attn: Makana Bender AOGCC 333 W 7th Avenue, Suite 100 Anchorage, AK 99501 %AMU NOV 1 82016 Enclosed are the materials listed below. If you have any questions,please contact Steve Thompson: 907-250-1200; Stevet@gyrodata.com or Jamie McCrimmon: 403-640-7755; Jamiem( gvrodata.com. Drill Site SW Name Date Description 03 03-27 05/30/2016 SURVEY REPORT: 1 Hard Copy; 1 Disk 09 09-29 06/15/2016 SURVEY REPORT: 1 Hard Copy, 1 Disk p2iAgoaofrigk.d4/7 Please Sign and Return o copy of this transmittal to BPXA,PDC: gancpdc@bp.com Thank You, Steve Thompson Gyrodata Inc. Gyrodata Incorporated 23000 Northwest Lake Drive Houston,TX 77095 RECLAVED !JUL 18 2016 AOGCC SURVEY REPORT BP Exploration Drill Site: 03 #03-27 Wellhead Prudhoe Bay, North Slope Borough, AK AK0616GCM124 28 June 2016 • June 28, 2016 State of Alaska -AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: Drill Site: 03, Well #03-27 Prudhoe Bay, Alaska Enclosed, please find one (1) copy, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, Steve Thompson Alaska District Manager • • WO/data BP Exploration (Alaska) Inc. Drillsite 03 03-27 Prudhoe Bay Unit 1 OF 11 AK0516GCM 124 i . gyroidata A Gy rod ata Directional Survey DEFINITIVE for BP EXPLORATION (ALASKA) INC. Lease: Drillsite 03 Well: 03-27 Location: Wellhead, Prudhoe Bay Unit Job Number: AK0516GCM124 Run Date: 30 May 2016 Surveyor: Joshua Camacho,Adam O'Connor Calculation Method: MINIMUM CURVATURE Survey surface coordinates obtained from: Well Plan/Plot Survey Latitude: 70.230373 deg. N Longitude: 148.278164 deg. W Azimuth Correction: None Gyro: Bearings are Relative to True North Depth Reference: Rotary Table Air Gap (RKB to MSL): 62.00 ft. Ground Elevation (Ground to MSL): 30.43 ft. Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Well Head Location 2 OF 11 AK0516GCM124 • • gr*data A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drillsite 03 Well: 03-27 Location: Wellhead, Prudhoe Bay Unit Job Number: AK0516GCM124 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.0 0.0 0.00 0- 10,300' RATE GYROSCOPIC CONTINUOUS MULTISHOT SURVEY RUN INSIDE 4.5"TUBING ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO RKB ELEVATION OF 62.00 FT AMSL RKB TO MSL: 62.00 FT/ BF TO MSL: 30.43 FT/BF TO SWAB: 10.5 FT/ SWAB TO GYRO SENSOR: 7.0 FT/ ZERO GYRO ON SWAB: +14.07 FT 100.00 0.23 260.91 100.00 0.03 S 0.20 W 0.2 260.9 0.23 200.00 0.20 254.50 200.00 0.11 S 0.57 W 0.6 259.0 0.04 300.00 0.17 275.35 300.00 0.14 5 0.89 W 0.9 260.8 0.07 400.00 0.12 295.58 400.00 0.09 5 1.13 W 1.1 265.6 0.07 500.00 0.16 314.22 500.00 0.05 N 1.32 W 1.3 272.3 0.06 600.00 0.15 330.72 600.00 0.27 N 1.48 W 1.5 280.1 0.05 700.00 0.04 6.66 700.00 0.42 N 1.54 W 1.6 285.2 0.12 800.00 0.10 154.36 800.00 0.37 N 1.50 W 1.5 284.0 0.15 900.00 0.39 158.10 900.00 0.03 S 1.33 W 1.3 268.9 0.29 1000.00 0.42 151.53 999.99 0.67 5 1.03 W 1.2 237.1 0.05 1100.00 0.41 162.77 1099.99 1.32 5 0.75 W 1.5 209.6 0.08 1200.00 0.47 172.21 1199.99 2.07 5 0.59 W 2.1 196.0 0.09 1300.00 0.33 174.51 1299.99 2.75 S 0.51 W 2.8 190.5 0.14 1400.00 0.24 159.41 1399.98 3.23 S 0.41 W 3.3 187.2 0.11 1500.00 0.18 172.50 1499.98 3.59 S 0.31 W 3.6 185.0 0.08 1600.00 0.06 193.37 1599.98 3.80 S 0.30 W 3.8 184.6 0.12 1700.00 0.27 131.13 1699.98 4.01 S 0.14 W 4.0 182.0 0.25 1800.00 0.50 125.44 1799.98 4.41 S 0.39 E 4.4 174.9 0.23 1900.00 0.84 74.51 1899.97 4.47 S 1.45 E 4.7 162.0 0.65 2000.00 1.77 55.87 1999.95 3.41 S 3.44 E 4.8 134.8 1.02 2100.00 3.38 47.95 2099.84 0.57 5 6.90 E 6.9 94.7 1.64 2200.00 3.18 45.04 2199.68 3.36 N 11.05 E 11.6 73.1 0.26 2300.00 2.53 45.46 2299.56 6.87 N 14.58 E 16.1 64.8 0.65 2400.00 2.08 41.66 2399.48 9.77 N 17.37 E 19.9 60.6 0.47 2500.00 1.84 20.07 2499.42 12.64 N 19.13 E 22.9 56.5 0.77 2600.00 4.42 335.31 2599.27 17.66 N 18.07 E 25.3 45.7 3.37 2700.00 7.61 320.02 2698.71 26.24 N 12.20 E 28.9 24.9 3.54 2750.00 9.20 325.18 2748.18 32.05 N 7.79 E 33.0 13.7 3.52 2775.00 10.00 328.00 2772.83 35.54 N 5.50 E 36.0 8.8 3.71 2800.00 10.79 330.28 2797.42 39.41 N 3.19 E 39.5 4.6 3.56 2825.00 11.29 331.13 2821.95 43.58 N 0.85 E 43.6 1.1 2.10 2850.00 11.98 331.59 2846.44 48.01 N 1.57 W 48.0 358.1 2.78 2875.00 12.75 331.97 2870.86 52.73 N 4.10 W 52.9 355.6 3.10 2900.00 13.35 332.23 2895.21 57.72 N 6.74 W 58.1 353.3 2.41 3 OF 11 AK0516GCM124 • • MfriCS/daW A Gy rod ata Directional Survey BP Exploration (Alaska) Inc. Lease: Drillsite 03 Well: 03-27 Location: Wellhead, Prudhoe Bay Unit Job Number: AK0516GCM124 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 2925.00 14.24 332.53 2919.49 63.00 N 9.50 W 63.7 351.4 3.57 2950.00 14.86 333.03 2943.69 68.58 N 12.38 W 69.7 349.8 2.53 2975.00 15.59 333.49 2967.81 74.45 N 15.33 W 76.0 348.4 2.96 3000.00 16.09 333.58 2991.86 80.55 N 18.37 W 82.6 347.2 2.00 3025.00 16.44 333.45 3015.86 86.82 N 21.49 W 89.4 346.1 1.41 3050.00 16.86 333.59 3039.81 93.23 N 24.69 W 96.4 345.2 1.69 3075.00 17.10 333.96 3063.72 99.78 N 27.91 W 103.6 344.4 1.05 3100.00 17.47 334.89 3087.60 106.48 N 31.12 W 110.9 343.7 1.85 3125.00 18.17 338.59 3111.40 113.51 N 34.13 W 118.5 343.3 5.32 3150.00 18.54 339.93 3135.12 120.87 N 36.92 W 126.4 343.0 2.24 3175.00 18.85 340.73 3158.81 128.42 N 39.62 W 134.4 342.9 1.61 3200.00 19.29 341.17 3182.43 136.14 N 42.28 W 142.6 342.7 1.85 3225.00 19.94 341.73 3205.98 144.10 N 44.95 W 150.9 342.7 2.71 3250.00 20.82 342.29 3229.42 152.38 N 47.64 W 159.7 342.6 3.61 3275.00 21.60 342.62 3252.72 161.00 N 50.37 W 168.7 342.6 3.16 3300.00 22.36 343.10 3275.91 169.94 N 53.12 W 178.1 342.6 3.12 3325.00 22.92 343.92 3298.98 179.17 N 55.85 W 187.7 342.7 2.57 3350.00 23.46 345.25 3321.96 188.66 N 58.47 W 197.5 342.8 3.01 3375.00 23.93 347.58 3344.85 198.42 N 60.83 W 207.5 343.0 4.19 3400.00 24.31 348.50 3367.67 208.42 N 62.94 W 217.7 343.2 2.14 3425.00 24.69 349.21 3390.42 218.59 N 64.95 W 228.0 343.5 1.92 3450.00 25.11 349.61 3413.10 228.94 N 66.88 W 238.5 343.7 1.81 3475.00 25.70 350.23 3435.68 239.50 N 68.76 W 249.2 344.0 2.59 3500.00 26.37 350.93 3458.14 250.32 N 70.55 W 260.1 344.3 2.95 3525.00 26.80 351.12 3480.50 261.37 N 72.30 W 271.2 344.5 1.75 3550.00 27.09 351.18 3502.78 272.57 N 74.04 W 282.4 344.8 1.17 3575.00 27.36 351.20 3525.01 283.87 N 75.79 W 293.8 345.1 1.08 3600.00 27.57 351.18 3547.20 295.26 N 77.56 W 305.3 345.3 0.84 3625.00 27.82 351.16 3569.33 306.74 N 79.34 W 316.8 345.5 1.00 3650.00 28.05 351.19 3591.42 318.32 N 81.14 W 328.5 345.7 0.92 3675.00 27.88 351.41 3613.50 329.90 N 82.91 W 340.2 345.9 0.80 3700.00 27.82 351.48 3635.60 341.45 N 84.65 W 351.8 346.1 0.27 3725.00 27.78 351.48 3657.72 352.98 N 86.38 W 363.4 346.2 0.16 3750.00 26.88 350.08 3679.93 364.31 N 88.21 W 374.8 346.4 4.42 3775.00 26.66 349.23 3702.25 375.39 N 90.24 W 386.1 346.5 1.77 3800.00 26.75 348.67 3724.58 386.42 N 92.39 W 397.3 346.6 1.07 3825.00 27.02 348.40 3746.88 397.50 N 94.64 W 408.6 346.6 1.19 3850.00 27.50 348.07 3769.10 408.71 N 96.97 W 420.1 346.7 2.01 3875.00 27.95 348.01 3791.23 420.09 N 99.38 W 431.7 346.7 1.80 3900.00 28.49 347.84 3813.26 431.64 N 101.86 W 443.5 346.7 2.18 4 OF 11 AK0516GCM124 • • gyn*clata A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drillsite 03 Well: 03-27 Location: Wellhead, Prudhoe Bay Unit Job Number: AK0516GCM124 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 3925.00 28.91 347.88 3835.19 443.38 N 104.38 W 455.5 346.8 1.68 3950.00 29.22 347.99 3857.04 455.26 N 106.92 W 467.6 346.8 1.26 3975.00 29.54 347.99 3878.83 467.26 N 109.47 W 479.9 346.8 1.28 4000.00 29.91 348.17 3900.54 479.38 N 112.03 W 492.3 346.8 1.52 4025.00 30.28 348.19 3922.17 491.65 N 114.60 W 504.8 346.9 1.48 4050.00 30.67 348.29 3943.71 504.07 N 117.18 W 517.5 346.9 1.57 4075.00 31.05 348.29 3965.17 516.62 N 119.79 W 530.3 346.9 1.52 4100.00 31.51 348.32 3986.54 529.33 N 122.42 W 543.3 347.0 1.84 4125.00 32.07 348.41 4007.79 542.23 N 125.07 W 556.5 347.0 2.25 4150.00 32.42 348.39 4028.93 555.30 N 127.75 W 569.8 347.0 1.40 4175.00 32.78 348.48 4049.99 568.50 N 130.45 W 583.3 347.1 1.45 4200.00 33.05 349.40 4070.98 581.83 N 133.06 W 596.8 347.1 2.27 4225.00 33.23 351.62 4091.92 595.31 N 135.31 W 610.5 347.2 4.91 4250.00 33.51 353.56 4112.80 608.94 N 137.09 W 624.2 347.3 4.41 4275.00 33.91 354.39 4133.59 622.74 N 138.54 W 638.0 347.5 2.44 4300.00 34.37 354.74 4154.28 636.71 N 139.87 W 651.9 347.6 2.00 4325.00 34.81 354.94 4174.86 650.84 N 141.15 W 666.0 347.8 1.82 4350.00 35.26 355.15 4195.33 665.14 N 142.39 W 680.2 347.9 1.86 4375.00 35.65 355.18 4215.70 679.59 N 143.61 W 694.6 348.1 1.56 4400.00 36.17 355.33 4235.95 694.20 N 144.82 W 709.1 348.2 2.11 4425.00 36.73 355.48 4256.06 709.01 N 146.01 W 723.9 348.4 2.27 4450.00 37.44 355.68 4276.00 724.04 N 147.17 W 738.8 348.5 2.88 4475.00 38.16 355.81 4295.75 739.32 N 148.31 W 754.0 348.7 2.90 4500.00 39.11 355.86 4315.28 754.89 N 149.44 W 769.5 348.8 3.80 4525.00 40.03 355.99 4334.55 770.77 N 150.57 W 785.3 348.9 3.69 4550.00 40.79 355.99 4353.59 786.94 N 151.71 W 801.4 349.1 3.04 4575.00 41.38 355.98 4372.43 803.33 N 152.86 W 817.7 349.2 2.36 4600.00 41.86 356.01 4391.12 819.89 N 154.02 W 834.2 349.4 1.92 4625.00 42.21 356.08 4409.69 836.59 N 155.17 W 850.9 349.5 1.41 4650.00 42.37 356.16 4428.18 853.37 N 156.31 W 867.6 349.6 0.68 4675.00 42.36 356.22 4446.65 870.18 N 157.43 W 884.3 349.7 0.17 4700.00 42.42 356.30 4465.12 887.00 N 158.53 W 901.1 349.9 0.32 4725.00 42.56 356.34 4483.55 903.85 N 159.61 W 917.8 350.0 0.57 4750.00 42.14 356.39 4502.03 920.66 N 160.68 W 934.6 350.1 1.69 4775.00 42.00 356.57 4520.59 937.38 N 161.71 W 951.2 350.2 0.74 4800.00 42.03 356.65 4539.16 954.08 N 162.70 W 967.9 350.3 0.25 4825.00 42.03 356.83 4557.73 970.79 N 163.65 W 984.5 350.4 0.48 4850.00 42.19 356.86 4576.28 987.53 N 164.57 W 1001.2 350.5 0.65 4875.00 42.11 357.02 4594.81 1004.29 N 165.47 W 1017.8 350.6 0.54 4900.00 41.83 357.23 4613.40 1020.98 N 166.31 W 1034.4 350.7 1.25 5 OF 11 AK0516GCM124 • • gYrOidata A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drillsite 03 Well: 03-27 Location: Wellhead, Prudhoe Bay Unit Job Number: AK0516GCM124 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 4925.00 42.09 357.29 4631.99 1037.68 N 167.11 W 1051.0 350.9 1.05 4950.00 41.79 357.39 4650.59 1054.37 N 167.88 W 1067.7 351.0 1.23 4975.00 41.86 357.55 4669.22 1071.02 N 168.62 W 1084.2 351.1 0.51 5000.00 41.99 357.70 4687.82 1087.71 N 169.31 W 1100.8 351.2 0.66 5025.00 42.06 357.99 4706.39 1104.44 N 169.94 W 1117.4 351.3 0.83 5050.00 41.91 358.37 4724.97 1121.15 N 170.47 W 1134.0 351.4 1.18 5075.00 41.67 358.55 4743.61 1137.81 N 170.92 W 1150.6 351.5 1.07 5100.00 41.74 358.70 4762.28 1154.44 N 171.32 W 1167.1 351.6 0.49 5125.00 41.70 358.80 4780.94 1171.07 N 171.68 W 1183.6 351.7 0.31 5150.00 41.70 358.99 4799.60 1187.70 N 172.00 W 1200.1 351.8 0.51 5175.00 41.61 359.24 4818.28 1204.31 N 172.26 W 1216.6 351.9 0.76 5200.00 41.53 359.31 4836.98 1220.90 N 172.47 W 1233.0 352.0 0.37 5225.00 41.75 359.38 4855.67 1237.51 N 172.66 W 1249.5 352.1 0.90 5250.00 41.54 359.59 4874.35 1254.12 N 172.81 W 1266.0 352.2 1.01 5275.00 41.57 359.67 4893.06 1270.70 N 172.91 W 1282.4 352.3 0.24 5300.00 41.41 359.78 4911.78 1287.26 N 172.99 W 1298.8 352.3 0.70 5325.00 41.24 360.00 4930.56 1303.77 N 173.03 W 1315.2 352.4 0.88 5350.00 41.52 0.07 4949.32 1320.30 N 173.02 W 1331.6 352.5 1.12 5375.00 41.44 0.40 4968.05 1336.86 N 172.95 W 1348.0 352.6 0.93 5400.00 41.44 0.64 4986.79 1353.40 N 172.80 W 1364.4 352.7 0.64 5425.00 41.46 0.84 5005.53 1369.95 N 172.58 W 1380.8 352.8 0.54 5450.00 41.46 0.86 5024.26 1386.50 N 172.34 W 1397.2 352.9 0.05 5475.00 41.36 0.93 5043.01 1403.04 N 172.08 W 1413.5 353.0 0.44 5500.00 41.32 0.85 5061.78 1419.55 N 171.82 W 1429.9 353.1 0.27 5525.00 41.27 0.86 5080.56 1436.04 N 171.58 W 1446.3 353.2 0.20 5550.00 41.09 0.90 5099.38 1452.50 N 171.32 W 1462.6 353.3 0.73 5575.00 41.27 0.96 5118.20 1468.96 N 171.06 W 1478.9 353.4 0.74 5600.00 41.18 1.00 5137.00 1485.43 N 170.78 W 1495.2 353.4 0.38 5625.00 40.91 1.12 5155.85 1501.85 N 170.47 W 1511.5 353.5 1.13 5650.00 40.81 1.18 5174.76 1518.20 N 170.14 W 1527.7 353.6 0.43 5675.00 40.97 1.20 5193.66 1534.56 N 169.80 W 1543.9 353.7 0.64 5700.00 40.89 1.32 5212.55 1550.94 N 169.44 W 1560.2 353.8 0.45 5725.00 41.05 1.29 5231.43 1567.32 N 169.07 W 1576.4 353.8 0.64 5750.00 40.83 1.39 5250.31 1583.70 N 168.69 W 1592.7 353.9 0.92 5775.00 40.79 1.44 5269.23 1600.03 N 168.28 W 1608.9 354.0 0.21 5800.00 41.04 1.60 5288.12 1616.40 N 167.85 W 1625.1 354.1 1.08 5825.00 41.17 1.98 5306.96 1632.83 N 167.34 W 1641.4 354.1 1.13 5850.00 41.29 2.52 5325.76 1649.29 N 166.69 W 1657.7 354.2 1.50 5875.00 41.36 2.92 5344.54 1665.78 N 165.91 W 1674.0 354.3 1.09 5900.00 41.49 3.24 5363.28 1682.30 N 165.02 W 1690.4 354.4 0.99 6 OF 11 AK0516GCM124 11110 110 gyr4data A Gy rod ata Directional Survey BP Exploration (Alaska) Inc. Lease: Drillsite 03 Well: 03-27 Location: Wellhead, Prudhoe Bay Unit Job Number: AK0516GCM124 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 5925.00 41.59 3.41 5382.00 1698.85 N 164.06 W 1706.8 354.5 0.60 5950.00 41.78 3.73 5400.67 1715.45 N 163.02 W 1723.2 354.6 1.14 5975.00 41.83 4.07 5419.30 1732.07 N 161.89 W 1739.6 354.7 0.93 6000.00 41.95 4.41 5437.91 1748.72 N 160.65 W 1756.1 354.8 1.03 6025.00 42.04 4.71 5456.49 1765.39 N 159.32 W 1772.6 354.8 0.88 6050.00 41.90 5.13 5475.08 1782.05 N 157.89 W 1789.0 354.9 1.26 6075.00 42.21 5.30 5493.64 1798.73 N 156.37 W 1805.5 355.0 1.32 6100.00 42.09 5.39 5512.18 1815.43 N 154.80 W 1822.0 355.1 0.54 6125.00 41.99 5.57 5530.74 1832.09 N 153.20 W 1838.5 355.2 0.63 6150.00 42.17 5.59 5549.30 1848.77 N 151.58 W 1855.0 355.3 0.72 6175.00 41.99 5.67 5567.85 1865.44 N 149.93 W 1871.5 355.4 0.75 6200.00 42.14 5.75 5586.41 1882.11 N 148.27 W 1887.9 355.5 0.64 6225.00 42.14 5.76 5604.95 1898.80 N 146.58 W 1904.4 355.6 0.03 6250.00 42.01 5.92 5623.51 1915.46 N 144.88 W 1920.9 355.7 0.67 6275.00 42.15 6.03 5642.06 1932.13 N 143.13 W 1937.4 355.8 0.63 6300.00 41.86 6.11 5660.64 1948.76 N 141.37 W 1953.9 355.9 1.18 6325.00 41.96 6.26 5679.25 1965.36 N 139.57 W 1970.3 355.9 0.57 6350.00 41.65 6.34 5697.88 1981.93 N 137.74 W 1986.7 356.0 1.26 6375.00 41.60 6.54 5716.57 1998.43 N 135.88 W 2003.0 356.1 0.57 6400.00 41.83 6.72 5735.23 2014.95 N 133.95 W 2019.4 356.2 1.04 6425.00 42.14 6.78 5753.81 2031.56 N 131.99 W 2035.8 356.3 1.25 6450.00 42.72 6.86 5772.27 2048.31 N 129.99 W 2052.4 356.4 2.33 6475.00 42.26 6.89 5790.70 2065.07 N 127.96 W 2069.0 356.5 1.84 6500.00 42.22 6.83 5809.21 2081.76 N 125.96 W 2085.6 356.5 0.23 6525.00 42.02 6.97 5827.75 2098.41 N 123.94 W 2102.1 356.6 0.88 6550.00 42.00 7.00 5846.33 2115.01 N 121.91 W 2118.5 356.7 0.11 6575.00 42.00 7.06 5864.91 2131.62 N 119.86 W 2135.0 356.8 0.16 6600.00 42.14 7.06 5883.47 2148.24 N 117.80 W 2151.5 356.9 0.56 6625.00 42.33 7.07 5901.98 2164.92 N 115.74 W 2168.0 356.9 0.76 6650.00 42.32 7.10 5920.46 2181.62 N 113.66 W 2184.6 357.0 0.09 6675.00 42.38 7.17 5938.93 2198.33 N 111.57 W 2201.2 357.1 0.31 6700.00 42.31 7.48 5957.41 2215.03 N 109.42 W 2217.7 357.2 0.88 6725.00 42.66 7.73 5975.85 2231.77 N 107.19 W 2234.3 357.3 1.55 6750.00 42.60 8.17 5994.24 2248.54 N 104.84 W 2251.0 357.3 1.22 6775.00 42.78 8.65 6012.62 2265.31 N 102.36 W 2267.6 357.4 1.49 6800.00 42.97 8.98 6030.94 2282.12 N 99.76 W 2284.3 357.5 1.18 6825.00 43.14 9.15 6049.21 2298.97 N 97.07 W 2301.0 357.6 0.82 6850.00 43.47 9.28 6067.40 2315.90 N 94.32 W 2317.8 357.7 1.37 6875.00 43.45 9.46 6085.55 2332.86 N 91.52 W 2334.7 357.8 0.50 6900.00 43.68 9.52 6103.66 2349.86 N 88.68 W 2351.5 357.8 0.93 7 OF 11 AK0516GCM124 • • Mkagt*CbM A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drillsite 03 Well: 03-27 Location: Wellhead, Prudhoe Bay Unit Job Number: AK0516GCM124 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 6925.00 43.72 9.59 6121.74 2366.89 N 85.82 W 2368.4 357.9 0.25 6950.00 43.61 9.66 6139.82 2383.91 N 82.93 W 2385.4 358.0 0.48 6975.00 43.93 9.73 6157.87 2400.96 N 80.02 W 2402.3 358.1 1.29 7000.00 44.02 9.77 6175.86 2418.06 N 77.08 W 2419.3 358.2 0.38 7025.00 44.08 9.80 6193.83 2435.19 N 74.12 W 2436.3 358.3 0.25 7050.00 44.35 9.79 6211.75 2452.37 N 71.16 W 2453.4 358.3 1.08 7075.00 44.33 9.81 6229.63 2469.59 N 68.18 W 2470.5 358.4 0.10 7100.00 44.71 9.70 6247.46 2486.87 N 65.21 W 2487.7 358.5 1.55 7125.00 44.74 9.64 6265.22 2504.21 N 62.26 W 2505.0 358.6 0.21 7150.00 44.95 9.58 6282.94 2521.59 N 59.31 W 2522.3 358.7 0.86 7175.00 45.16 9.65 6300.60 2539.04 N 56.36 W 2539.7 358.7 0.86 7200.00 45.16 9.68 6318.23 2556.51 N 53.38 W 2557.1 358.8 0.09 7225.00 45.48 9.71 6335.81 2574.03 N 50.39 W 2574.5 358.9 1.28 7250.00 45.65 9.73 6353.31 2591.63 N 47.38 W 2592.1 359.0 0.68 7275.00 45.55 9.79 6370.80 2609.23 N 44.35 W 2609.6 359.0 0.44 7300.00 45.82 9.80 6388.27 2626.86 N 41.30 W 2627.2 359.1 1.08 7325.00 46.07 9.75 6405.65 2644.57 N 38.25 W 2644.8 359.2 1.01 7350.00 46.01 9.84 6423.01 2662.30 N 35.19 W 2662.5 359.2 0.35 7375.00 45.86 9.79 6440.39 2680.00 N 32.13 W 2680.2 359.3 0.62 7400.00 46.23 9.73 6457.75 2697.74 N 29.08 W 2697.9 359.4 1.49 7425.00 46.41 9.73 6475.01 2715.56 N 26.02 W 2715.7 359.5 0.72 7450.00 46.24 9.61 6492.28 2733.38 N 22.99 W 2733.5 359.5 0.76 7475.00 46.31 9.45 6509.56 2751.20 N 20.00 W 2751.3 359.6 0.54 7500.00 46.17 9.35 6526.85 2769.01 N 17.05 W 2769.1 359.6 0.63 7525.00 46.43 9.46 6544.12 2786.84 N 14.09 W 2786.9 359.7 1.09 7550.00 46.45 9.52 6561.35 2804.71 N 11.11 W 2804.7 359.8 0.19 7575.00 46.23 9.61 6578.61 2822.55 N 8.10 W 2822.6 359.8 0.92 7600.00 46.31 9.67 6595.89 2840.36 N 5.08 W 2840.4 359.9 0.36 7625.00 46.27 9.72 6613.16 2858.17 N 2.03 W 2858.2 360.0 0.22 7650.00 46.36 9.73 6630.43 2875.99 N 1.02 E 2876.0 0.0 0.36 7675.00 46.17 9.55 6647.71 2893.80 N 4.05 E 2893.8 0.1 0.92 7700.00 45.90 9.47 6665.07 2911.54 N 7.02 E 2911.6 0.1 1.10 7725.00 45.93 9.44 6682.46 2929.26 N 9.97 E 2929.3 0.2 0.15 7750.00 46.10 9.70 6699.82 2946.99 N 12.96 E 2947.0 0.3 1.01 7775.00 45.98 9.79 6717.18 2964.73 N 16.01 E 2964.8 0.3 0.55 7800.00 45.92 9.68 6734.56 2982.44 N 19.04 E 2982.5 0.4 0.40 7825.00 46.09 9.63 6751.93 3000.17 N 22.06 E 3000.3 0.4 0.70 7850.00 46.00 9.58 6769.28 3017.92 N 25.06 E 3018.0 0.5 0.39 • 7875.00 46.08 9.54 6786.63 3035.66 N 28.05 E 3035.8 0.5 0.34 7900.00 46.03 9.31 6803.98 3053.42 N 31.00 E 3053.6 0.6 0.69 8 OF 11 AK0516GCM124 • 0 gyre*• 1; A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drillsite 03 Well: 03-27 Location: Wellhead, Prudhoe Bay Unit Job Number: AK0516GCM124 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 7925.00 46.09 9.28 6821.33 3071.18 N 33.91 E 3071.4 0.6 0.26 7950.00 46.15 9.25 6838.66 3088.97 N 36.81 E 3089.2 0.7 0.26 7975.00 46.10 9.39 6855.98 3106.75 N 39.73 E 3107.0 0.7 0.45 8000.00 45.84 9.44 6873.36 3124.48 N 42.67 E 3124.8 0.8 1.05 8025.00 45.68 9.52 6890.80 3142.15 N 45.62 E 3142.5 0.8 0.68 8050.00 45.87 9.47 6908.24 3159.82 N 48.57 E 3160.2 0.9 0.77 8075.00 45.66 9.55 6925.68 3177.49 N 51.53 E 3177.9 0.9 0.87 8100.00 45.36 9.33 6943.20 3195.08 N 54.46 E 3195.5 1.0 1.35 8125.00 45.20 9.32 6960.79 3212.61 N 57.34 E 3213.1 1.0 0.64 8150.00 45.11 9.45 6978.42 3230.10 N 60.23 E 3230.7 1.1 0.52 8175.00 44.86 9.37 6996.10 3247.53 N 63.12 E 3248.1 1.1 1.03 8200.00 44.76 9.42 7013.84 3264.91 N 65.99 E 3265.6 1.2 0.42 8225.00 44.81 9.40 7031.58 3282.29 N 68.87 E 3283.0 1.2 0.21 8250.00 44.63 9.31 7049.35 3299.64 N 71.73 E 3300.4 1.2 0.76 8275.00 44.66 9.26 7067.13 3316.98 N 74.57 E 3317.8 1.3 0.18 8300.00 44.64 9.32 7084.92 3334.32 N 77.40 E 3335.2 1.3 0.19 8325.00 44.51 9.32 7102.73 3351.64 N 80.24 E 3352.6 1.4 0.52 8350.00 44.49 9.23 7120.56 3368.93 N 83.07 E 3370.0 1.4 0.26 8375.00 44.26 9.13 7138.43 3386.19 N 85.86 E 3387.3 1.5 0.96 8400.00 44.20 9.24 7156.34 3403.40 N 88.64 E 3404.6 1.5 0.39 8425.00 44.29 9.08 7174.25 3420.63 N 91.42 E 3421.8 1.5 0.57 8450.00 44.18 9.08 7192.16 3437.85 N 94.17 E 3439.1 1.6 0.44 8475.00 44.24 9.10 7210.08 3455.06 N 96.92 E 3456.4 1.6 0.25 8500.00 44.17 9.11 7228.00 3472.27 N 99.68 E 3473.7 1.6 0.28 8525.00 43.95 9.09 7245.97 3489.44 N 102.43 E 3490.9 1.7 0.88 8550.00 43.96 9.09 7263.96 3506.57 N 105.17 E 3508.1 1.7 0.04 8575.00 43.68 9.17 7282.00 3523.66 N 107.92 E 3525.3 1.8 1.14 8600.00 43.81 9.03 7300.06 3540.73 N 110.65 E 3542.5 1.8 0.65 8625.00 43.79 9.18 7318.11 3557.82 N 113.39 E 3559.6 1.8 0.42 8650.00 43.47 9.22 7336.20 3574.84 N 116.15 E 3576.7 1.9 1.28 8675.00 43.44 9.15 7354.35 3591.82 N 118.89 E 3593.8 1.9 0.23 8700.00 43.32 9.14 7372.52 3608.77 N 121.62 E 3610.8 1.9 0.48 8725.00 43.07 9.09 7390.75 3625.67 N 124.33 E 3627.8 2.0 1.01 8750.00 43.31 9.10 7408.97 3642.56 N 127.04 E 3644.8 2.0 0.96 8775.00 43.03 9.18 7427.21 3659.45 N 129.76 E 3661.7 2.0 1.14 8800.00 42.89 9.13 7445.50 3676.27 N 132.47 E 3678.7 2.1 0.58 8825.00 42.88 9.22 7463.82 3693.07 N 135.18 E 3695.5 2.1 0.25 8850.00 42.65 9.22 7482.17 3709.82 N 137.90 E 3712.4 2.1 0.92 • 8875.00 42.65 9.21 7500.56 3726.54 N 140.61 E 3729.2 2.2 0.03 8900.00 42.51 9.17 7518.97 3743.24 N 143.31 E 3746.0 2.2 0.57 9 OF 11 AK0516GCM124 • • . MffOiCbib A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drillsite 03 Well: 03-27 Location: Wellhead, Prudhoe Bay Unit Job Number: AK0516GCM124 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 8925.00 42.35 9.35 7537.42 3759.89 N 146.03 E 3762.7 2.2 0.80 8950.00 42.18 9.24 7555.92 3776.48 N 148.74 E 3779.4 2.3 0.74 8975.00 41.99 9.25 7574.48 3793.02 N 151.43 E 3796.0 2.3 0.76 9000.00 42.08 9.29 7593.05 3809.54 N 154.13 E 3812.7 2.3 0.38 9025.00 41.96 9.33 7611.62 3826.05 N 156.84 E 3829.3 2.3 0.49 9050.00 41.78 9.31 7630.24 3842.52 N 159.54 E 3845.8 2.4 0.72 9075.00 41.60 9.30 7648.90 3858.93 N 162.23 E 3862.3 2.4 0.72 9100.00 41.52 9.17 7667.61 3875.30 N 164.89 E 3878.8 2.4 0.47 9125.00 41.45 9.36 7686.34 3891.64 N 167.56 E 3895.2 2.5 0.58 9150.00 41.19 9.33 7705.11 3907.93 N 170.24 E 3911.6 2.5 1.04 9175.00 41.08 9.18 7723.94 3924.16 N 172.88 E 3928.0 2.5 0.59 9200.00 40.97 9.09 7742.80 3940.36 N 175.49 E 3944.3 2.6 0.50 9225.00 40.93 9.03 7761.69 3956.54 N 178.07 E 3960.5 2.6 0.22 9250.00 40.61 9.26 7780.62 3972.66 N 180.66 E 3976.8 2.6 1.41 9275.00 40.11 9.37 7799.67 3988.64 N 183.28 E 3992.8 2.6 2.02 9300.00 39.62 8.86 7818.86 4004.46 N 185.82 E 4008.8 2.7 2.36 9325.00 38.69 8.40 7838.24 4020.07 N 188.19 E 4024.5 2.7 3.90 9350.00 37.76 7.97 7857.88 4035.38 N 190.39 E 4039.9 2.7 3.87 9375.00 37.10 7.30 7877.74 4050.44 N 192.41 E 4055.0 2.7 3.10 9400.00 36.55 7.40 7897.75 4065.30 N 194.33 E 4069.9 2.7 2.21 9425.00 36.25 7.75 7917.87 4080.00 N 196.29 E 4084.7 2.8 1.46 9450.00 35.67 8.23 7938.11 4094.54 N 198.33 E 4099.3 2.8 2.58 9475.00 34.79 8.40 7958.53 4108.81 N 200.41 E 4113.7 2.8 3.54 9500.00 34.15 9.24 7979.14 4122.79 N 202.58 E 4127.8 2.8 3.19 9525.00 33.18 9.72 7999.94 4136.46 N 204.86 E 4141.5 2.8 4.02 9550.00 32.10 9.62 8021.00 4149.75 N 207.13 E 4154.9 2.9 4.33 9575.00 31.33 10.10 8042.26 4162.70 N 209.38 E 4168.0 2.9 3.24 9600.00 30.65 10.60 8063.69 4175.37 N 211.69 E 4180.7 2.9 2.91 9625.00 29.78 10.37 8085.30 4187.74 N 213.98 E 4193.2 2.9 3.51 9650.00 29.15 10.74 8107.06 4199.83 N 216.23 E 4205.4 2.9 2.62 9675.00 28.32 11.03 8128.98 4211.63 N 218.50 E 4217.3 3.0 3.37 9700.00 28.05 11.16 8151.02 4223.22 N 220.77 E 4229.0 3.0 1.11 9725.00 26.91 11.90 8173.20 4234.52 N 223.08 E 4240.4 3.0 4.76 9750.00 26.31 12.18 8195.55 4245.47 N 225.41 E 4251.4 3.0 2.45 9775.00 25.27 13.06 8218.06 4256.08 N 227.79 E 4262.2 3.1 4.43 9800.00 24.40 13.17 8240.75 4266.31 N 230.17 E 4272.5 3.1 3.48 9825.00 23.64 13.49 8263.58 4276.21 N 232.51 E 4282.5 3.1 3.08 9850.00 23.26 13.49 8286.52 4285.89 N 234.84 E 4292.3 3.1 1.52 • 9875.00 22.17 13.99 8309.58 4295.26 N 237.13 E 4301.8 3.2 4.43 9900.00 21.90 14.35 8332.75 4304.36 N 239.42 E 4311.0 3.2 1.21 10 OF 11 AK0516GCM124 0 0 Wm/data A Gy rod ata Directional Survey BP Exploration (Alaska) Inc. Lease: Drillsite 03 Well: 03-27 Location: Wellhead, Prudhoe Bay Unit Job Number: AK0516GCM124 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 9925.00 20.95 14.36 8356.03 4313.20 N 241.69 E 4320.0 3.2 3.80 9950.00 19.87 14.91 8379.46 4321.64 N 243.89 E 4328.5 3.2 4.39 9975.00 19.15 15.99 8403.02 4329.69 N 246.11 E 4336.7 3.3 3.22 10000.00 18.89 15.76 8426.66 4337.52 N 248.34 E 4344.6 3.3 1.08 10025.00 18.32 16.26 8450.35 4345.19 N 250.54 E 4352.4 3.3 2.37 10050.00 17.86 16.71 8474.11 4352.63 N 252.74 E 4360.0 3.3 1.92 10075.00 17.34 16.78 8497.94 4359.87 N 254.92 E 4367.3 3.3 2.08 10100.00 16.87 17.27 8521.84 4366.90 N 257.07 E 4374.5 3.4 1.97 10125.00 16.46 17.90 8545.79 4373.74 N 259.24 E 4381.4 3.4 1.79 10150.00 16.05 18.52 8569.79 4380.39 N 261.42 E 4388.2 3.4 1.78 10175.00 15.38 17.36 8593.85 4386.83 N 263.51 E 4394.7 3.4 2.96 10200.00 14.90 17.75 8617.98 4393.05 N 265.48 E 4401.1 3.5 1.96 10225.00 14.63 17.29 8642.16 4399.13 N 267.40 E 4407.2 3.5 1.18 10250.00 14.82 16.79 8666.34 4405.20 N 269.26 E 4413.4 3.5 0.91 10275.00 14.95 17.00 8690.50 4411.35 N 271.13 E 4419.7 3.5 0.56 10300.00 14.95 16.59 8714.65 4417.52 N 272.99 E 4426.0 3.5 0.42 Final Station Closure: Distance: 4425.95 ft Az: 3.54 deg. 11 OF 11 AK0516GCM124 Survey QC - RGS-Continuous Specification Sheet 1ta SURVEY QUALITY CONTROL-SPECIFICATION DATA PRE-30B CALIBRATION VERIFICATION ROLL TEST) System Parameter dGx dGy dmbo Mean Gravity Error* Stdev Gravity Error Standard Deviation 0.008 0.008 0.008 0.00006 0.00008 Tolerance 0.033 0.033 0.087 0.00591 0.00720 GYRO VERIFICATION (ADVANCED INITIALISATION) Gyro Compass Parameter Gyro noise dGx dGy dmbo Max corr coef Standard Deviation 0.053 0.006 0.006 0.000 0.15 Tolerance 0.141 0.033 0.033 0.087 0.45 Initialisation inclination standard deviation 0.08 Initialisation azimuth standard deviation 0.46 Initialisation azimuth uncertainty in percent of error model -Tolerance < 100% 39% ACCELEROMETER VERIFICATION (G-TOTAL TEST)-not applicable for 2 accelerom G-Total Test Parameter Mean Gravity Error Mean Gravity Error Standard Deviation Error 0.00020 0.00004 Tolerance 0.00590 0.02145 CALIBRATION Tool Number F0250 Calibration Date 10 Mar 2015 OPERATING TEMPERATURE Calibration range From 29.96 To 119.93 Gyro operating range From 39.65 To 84.21 In-Spec if+/-2.5 °C of Calibration CONTINUOUS DRIFT CORRECTION Linear Drift Uncertainty 0.19 Random Walk Uncertainty 0.03 Tolerance 0.46 Tolerance 0.23 CONTINUOUS MISALIGNMENT CORRECTION Misalignment Parameter dMx dMy Cross corr coef Standard Deviation Tolerance DEPTH CONTROL Wireline Company HALLIBURTON Line type 7/32" Encoder SF HALLIBURTON Max Depth(TD) 10300 CCL Corrected NO Zero Depth (Rig up) RKB @ 62 FT. Rezero Depth -6.43 Given pup joint depth N/A Measured P3 N/A Strech cor. At TD divided by TD/1000 .7645 Spec'- 1.5/1000 Dif. Between rigup and rezero depths divided by TD/1000 .8091 Spec'- 2.0/1000 Dif. Between given and meas depth divided by meas/1000 N/A Spec'- 2.0/1000 INDIVIDUAL STATION REPORT %of Total stations accepted Tolerance > 80% 100% Consecutive Interval out of Specification Tolerance < 100 m (300 ft) 26 feet SURVEY RUNNING TIME Rig up 5/30/2016 11:00:00 AM Rig down 5/31/2016 2:45:00 AM Start Inrun 5/30/2016 3:41:00 PM Field Survey Presented End outrun 5/31/2016 2:30:00 AM Lost Time Comments SURV-Q163 December 2011 Page 1 of 2 Created:28-Jun-16 08:35 AK0516GCM124 • Survey QC - RGS-Continuous Specification Sheet gyr4data ACCEPTANCE SUMMARY Accept NAME AND DATE Yes/ No Pre-job calibration verification (roll test) YES Click here to enter text. Gyro Verification (Advanced Initialisation) YES Accelerometer verification (G-Total Test) YES Operating temperature within calibration range(+/- 2.5°) YES SIGNATURE Continuous Drift Correction YES Click here to enter text. Continuous Misalignment Correction N/A Depth Control YES Individual Station Report YES Note : Any modifications or amendments to this sheet must be reported to the client representative and the Gyrodata survey focal point. SURV-Q163 December 2011 Page 2 of 2 Created:28-Jun-16 08:35 AK0516GCM124 VERTICAL DEPTH (ft) r 0 o 0 0 Cr.a Co 0 r v o 0 a a m mo 0 0 0 0 0 0 0 0 0 — rt.77X O iiIIII IIIlIllllIllll ( I11I1111IIII1111111 , 00O to 1r D 1 1 l 1 1 1 1 1 FL O - C (Ajr.31 U - \ ci. "4 5 O\ 3. -Pn 0 - to O C --I c O" CU c _ C3 z O - rt W - 0 a a a J J a J J. 0 'T 0— H 41 y 4 4 4 4 r 0 — 4. V' 0- l 1 l 1 -1 1 1 1 1 m D - C - Xi m at - 00 0 m0 - m v -I - I 0 J J J J J .1 J .1 J. CD* 0 _ oa - 0- .. .. rl rt r ♦ ♦ ♦ O _ - 0- , 1 S I 0 - N - `.4 r - - 0 0- 0cn 0 - I-, 0 _ I- 133 O - Q O O C) rn 71,-,D F, d -1 0 r a) 0- J J J J J J J Lul QS'--J. f u 0O 0 rt m 0 m ►�. a - Z " OD r - fl < P) Cara) O . mal 0 0 INCLINATION N N CO wfik t r w 0 (..n • (A a cn o cn cn O 0 1 1 1 1 1 1 tit 1 1 t h , 1 1 1 1 1 1 1 1 1 1 r t i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 .--M R. O FI fIrj. NO i J . J . J O� iy, O .war co C41.`-` .. N ? Ut n O O _ w a - al "" C w - f-' O •-...--J ._-J ..• J L J .----. O O T 0 . J . J lJ 5. O^ 0 (..rt O . .4 . .4 L J {. 0 om D - cn c - 7 mal - C)o 0 . J J . J .. J-- -._.__--- C1 m - v -I - I r-'y O . J . J 4. 4 . a L..._. O: 0 OD - t 0 J J 5 4 . 3 --, O- 0 t0 - 0._ . J 5 J ♦ 9 0 _ t — N *-1 0- 5 J -- 5 4 4. J O 0 O O !.J M . _ C1 0 O n.. 4 v 1-` - om0 I- m I-' N vl 0— . JO TY�1 J 5 J L J 4 -- f� CO • 0 - 0 V TQ rt in - 0 m f- a zo w I-, - � a < N '4rt. m 0 0 NORTHING (ft) •rte N N w . 0 -4 0 m 0 0 0 0 0 0 0 0 0 0com 0 0 0 0 0 0 0 0 0 0 r, = X ` 1111111111114111141f I11111111111111111- 111111111 . 1 03 �O O _ w ni n . Ri (DD 0' cn w^ " Cl.I - O (1•1 l F" _ 1L 0 01 n tD -4 co C - 11, cs 1-+ 3 0----r----- r -+ r 1 ri r -I - Cto O3 _ rt 1.O 0.-•- ----^t r v r ' r 11 r '-• m - A cn 0 r O (JI— r -i r l r 1 r 1 r------1- O ro ro 0-. I. J l J l J L J l ____J.. ''.! o ) c O 3 _ in 0 - cr. a co N - qO0 g i O---r . ♦ Y - . 4._ '..Y>. .• �) 4V 1 O N 41 — m �' CDo O t 0 r3r - p Z -t Ut m -4 0. 0s - < rtCD . ma -c DOGLEG SEVERITY (deg/100ft) o 0 N P3 w wt� • cn (ft r- -o b in in b in o in o o in 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ft �x O 3 O vy Ou • O a) O -_-♦ 1. ` M ♦ r T r T T Y OJ 0 A' O� 41' .9.(A) gl .13 K.) x. N - O=-US 9 00i -1 r T T r s r ,- -'1 0 - @ C OJ6 K 3 Co r1 (A) " - -•11.." O T _� T t t' 0 ` _ u_____J____410 t i . • II O T TT T 1' O — AIN in - 0 _ •D Cf, C - - 00 0 0 t M© • v - ,„„=„._ 0- .2....6.__ __, • s — ao — CD ' O a a a A �. 0 _ ._ - o A a a A J 0 _ it w—.._.. � _ ^-- r - • Qv - _ 0 ._,. _ A C 0 j a .....=7"--------- ---- . 0 aI I 0 O _ ; LnO - _ 0 r . - in. r Co v $_,, - 0000 -• co 0_ - aC74 . , . - . a nz u1 0 tD 0 — mm0 rrr O 0 = a. - 0 - oto N _ m � a < a, 0 ' ' m Cu- 0 0 0 >, ITI III • • , .. . 0 0 , cm _ - „ >.•r":" w to -1 CD - ID LU 0 ' ' 4-0 0 ° - CD C 0 * cu NI' _ca.g 0 ul CNI 2 ui 7-1 CD 1-4 ci. 0 - Cri (.9 0 0 ei j__..,.•.*.__ . - a; ..-1 3 ' , - o 0 1I 0 0I----4 I. I. .4 • c Z •4 '•' ,--i rn N - Cq - o r r 1 T 0 0 .... CA - D I. I. .J 1. 0 0 - CO - o 0 r r , T 0 ... r.,:p. I ••• l- a - w o CI 00 - vow W - D CO "' 4:( w a 0 I. .,. a , 0 0 - U-) - o 0 r r -I r 0 ... 1- - -- 0 .1 I. t J 1 0 0 ... al C 0 0 F- CO • _____.- - CV CU - - N z 1 CI 0 VI 0 ro 0 16 - ,^4 C = o .I-,(1) 11) - - M r_• -• I 1 1 1 iiii 1 Ii 1 I ill 1 1 11 il 1 1 1 1 1 t 0 0 0 0 0 0 0 x ..:..: -4....0 0 0 0 0 0 0 W-'To (`3 6 6 6 6 6 6 6 a 3 0 al * tr) o to o in c0 -J cr) c9 CN 01/41 .-1 HinIAIIZV STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMI.N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool ❑ Repair Well 0 Re-enter Susp Well ❑ Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 184-062 3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21109-00-00 7. Property Designation(Lease Number): ADL 0028328 8. Well Name and Number: PBU 03-27 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY.PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 10826 feet Plugs measured 10394 feet MAY 19 2016 true vertical 9225 feet Junk measured 10366 feet Effective Depth: measured 10394 feet Packer measured 9965 feet AOGCC true vertical 8808 feet Packer true vertical 8395.87 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"91.5#H-40 35-115 35-115 1490 470 Surface 2373 13-3/8"72#L-80 34-2406 34-2406 4930 2670 Intermediate 10172 9-5/8"47#L-80 32-10204 32-8624 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 41 2166 8747 1860 323 Subsequent to operation: 146 318 4474 1738 481 14.Attachments:(required per 20 MC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development m Service 0 Stratigraphic ❑ Copies of Logs and Surveys Run 0 16.Well Status after work: Oil IZ1 Gas ❑ WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP ❑ SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature A "` 1 Phone +1 907 564 4424 Date 5/18/16 Form 10-404 Revised 5/2015 VT L s-/.2 .//c, Submit Original Only X7./6 RBDMS IN MAY 2 3 2016 • • Cu Q o• O o O O O O O M r- N- Cf� NO NO NO O O O 0 U y 0 0 0 0 0 0 0 0 .- 0) M N- C9 CO CO CO • Nt 0) CO .- r V N. .1- Ca m r V CO CO CO CO CO C!) CO d- CD N- N- V CA O N N r CO O M N 00 CO 0) CO CO CO B i l i H CO (0 •1- CV N O N LO O O CO CO CO CO CO N- CO LO CO CO CO M a) O = M O O N O CO M L O r N 00 0 co 0 r r r r V Qcc co N CI) V N (.0 CA M O Cf) 0.)Co") CO CO CO O CO 10-• M• Q nO O O CO O CO 0 • _1 . o m cDMU M Z r M r N C• IC) N N 2 J o # *k •Nr *k N = N CO CO' N N r - C() I� N O M o N r N V . N M ti N M r- CO ON Cr) N l!) C cc (') r N N r in V J N (.O O CO CO w ~ C O0 — C) w w U D a Z Z Z Ct w w w w m m Q D l— Z_ Z Z_ D D 0 (n Z J J J �- I • • d N m m O) N O) N Lo OO N N CO OO M M O CD CO N N O) N r L1) N t O d- O 0 r� CO r 0 r` CO Lf) ctM r� V N O O O N r p_ O O (0 O r` O 6 Lf) r- r r- O N Io N N cc N N OO r` O O Cfl CO O) O CD O v- N N M QD r` N- r` O) O O r N- N N- O O M Cfl Cfl r` r` r` r` r` r N- N- r` r` r` r` 00 co o0 a0 O) O) O CO 00 OD CO CO 00 M 00 00 00 CO 00 CO 00 00 00 CO CO CO OD 00 O) CD1- 0.O. O I— LO O) N O) CO Ln CO N- N Cfl O) M M CO 0) CO N N CO V r CO y r` O - O OO r- Cfl V r O Cfl Cfl Lo O Cfl N M IC) O O- O) O) 00 00 M r` O) Lo Lo r.: 6 O N M Lo N 00 N M CO Ln O R V CO CO O) O O O v- N CV Cfl (0 r` r` CO O) O O O LO OO W • CO Cfl Cfl Cfl r` r` r` r ti r N- r` r` r` r` N- MCO 00 O) O) > in OO OO CO 00 00 M OD OD CO OD 00 00 00 00 M OD OO OO 00 00 OO (30 0 > w Wcr 0 O 0 W Z w W w p W 0 Q Q J 0 W M J J Y C) O m0 O CD w Y Y F g t 0 0 0 N O N CO CO O OD N Lf) r` O co OO d' Cr) O CO O) N CDJ U U W W W In r` CO 00 O) O) O) O r r Lo Lo LU (0 N- C0D 0) O) CO r (.0O J J J a a W N N N N N N M CV) CY) M C') M M M MMM 't Lo LO O < < < W 1 CIZ TW a N = D 0 0 0 0 0 0 0 0 0 0 CD 0 0 0 0 0 0 0 0 CD 0 O _U _U _U J W W J J J to - - - - -- - - - - - r Z Z Z O2 Q Q 0_ 2 0 0 0 W e Z QQ Z C) ti 2 2 2 O c) 0) U¢) 0 n Ji) La CO N QM a O , = . 0 0 0 0 C9 O N OO CX) O O N Lo r` OO r DD V O M r` M a, M Lo r` CX) CX) O) O) O7 O r Lo Lo Lo Lo M CX) OD O7 Lo O V CX) Q . N N N N N N N N C'') CV) m M M M M MMM Lo Lf) Ln 47. W 0 0 0 O O O O O O O O O O O O O O O O O O O O (0a y r r r r r r r r r r r r r r r r r r r r r r m L d 2 O cn cn cn cn Ln a, a 0 U c 9. LL LL LL LL LLC) CncnC1) CALLLLLLa. a. a. a. a. a. a. a. a. O < < < W D D W D Q Q Q m m m m m m m m m 0.0 t d M O H co o o .-- °) o CT- C C co co co In In In In In In In In 0 D 7 :7 0 O 0 0 0 0 00000000000000000 W _I -J Z O N N N N N N N N N N N N N N N N N N N N N Z u- 1 1 < J.r W c N N - - - N N = = = N N N N M M M CO M M M O Z a J W :� CJ _U 0J.JW w LL W Q V M M M Or M M M M M it Nr OO CX) OD 00 00 00 OD OD a 0 D _1 _ H J J D J D c[ d O CO OYDY W J -, 3Q O W W a a T1 O_ 17 Cn LL LL :n tL Cn O_ CY m E m Z r` r- r- N- N- r` r r` r` r• r` r` N- r` r` N- r` r` r` N- N- ti N N N N N N N N N N N N N N N N N N N N N N I . . . . . . . . . . . . . . . i i , , LL O_ WO LL N CC LL CV) M M M CV) M CO C`') CV) C`') C`') CV) C`') CV) C'') M M M M M M M a O_ O_ Cl. U J O O W O_ O O O O O O 0 O O O O O O O O 0 0 0 0 0 0 O a s CO 00 LL L_ U) co Cl.. cc • Packers and SSV's Attachment PBU 03-27 SW Name Type MD TVD Depscription 03-27 TBG PACKER 9964.7 8395.87 4-1/2" Baker S-3 Perm Packer 03-27 PACKER 10338.27 8754.36 4-1/2" Baker FB-1 Isolation Packer • • • L >' O c CU 73c ,_�. o o 0 o 7 N C Y aO E O Q Q °� CO am o - rn o0 * * - 3 -c8 >, �. a) c `t * `n a r� o in a) u) `n 3 co 'n -0 c L a CD L CU QOM oQ w E o c Z U) CO a) o0 0o Q o = oo a_ o Q ai a�'i co s T- to 0 0) o c co U) .- U) cN) Cl) Cl) L N 7 d U) N C - 0 o )a Lc) o_ L m 3 tx O c� oti © " E E 2 O -a E 2ci 0 = a V > `� � a >, o n • O 2 0C ?ALL Q o Cl- o0 o C 73 a c a)co O F- 0 0 co a) a) o ) �. •5 a c w a) . . 0 CO03 Q o o = aoi -c a Y - o c o w o c• 0 c co o c c o 3 = E c n- 0 E u0i W 03 oc � E o o a) 0_ o a) 0- W _ _ _ O `. ° U 0 rn o 0 0 ca a° N 0 a)Na) ix w 47, Et � a on :. -0ZQ c L ;. N a) -0W > ca < cn 0 co -_c cn Cl) .o X 2 0 rn cn co 0 G1 2 rn ° a)H ~ 0 a) a) cXC .L �o a) � � � Q cn - c z a H - 3 rn E - a) o a) z 0 2 -CL 2c a) C Z a) a) o Y c co >)- cn Q-O c' J N a) w L * N -0 L 1 L 1 co 2 c LL 7.Y m L (n LL J in .) M _ O a as a) w N C co co co 0, 0 U) p Cl) 0 'C _, o > Z N o o Qo) O o co p p o * w0 .3 cca Ora c .- II in c:)- 14 O -, c0 _0 * U 3 c = _ . UctUce cin2 >,�' n 0 U >C> c p -50 0 Op ca L co lf) LL O N EE co * LL U) LL U) m \ co w a C N LL > +. 73 C) C V* aim • 0I- ai a-no) � D oD o � co =_ Y n.-ao Q Dw II oo E2r � Yin Ce = � .0 • 0 3 rI n i a) c - ao0 mU a) � cn E oN LiD v U * E o � o � � � Qo -a- � w cn � o rnoU Fn y .( I� m &O -Ccu aF— - � z ti > JZO �RS 0 •E w cnQO4- c cn c cn c E 0 = -- coOo -0 `- o Q CI F_ cQ � F- > curd cQ oQ 0 � o -c o'a - 3 * Q = Ninrn � o0000 a)) o � � . 0 . 0 ow U QO - F- Ua o -0 0 � * r- * U -0 3 f vi � * 2c) >, 0-QaFD to 0 a) cte Uto as C � ,C *— C to w = .cCO � a) .� F_ � ID � Z a) ZvofZ C � ° � Cn 0 o c D > D • .S M 03 5 0 a) Q D z o a a. II � O � O f- • E 4 cn , o = p c cn - c O c - E E > 0 3 mo , N _ Z y0) c o U F._ ) yo� 3 0 E o ff o H o 0)0 °) a) a1i � .�' c0.) H � � o � H o J c), /y� * * C a.O a LL LL * -0 C L L -0 0 w ' W � o � w � Hoo � � w � w � � � C 0a)) cow a) --a). QQ � 0 2 o * < 000 _c a* < 0 < 00 : 0 0_ 0 o > * < E CO co cL5 * CC CC * Lu H QQ cn in in u) in in u-) U) u-)r r r r r r r ,- ,- CD 0 0 o 0 o 0 0 0 0 H N N N N N N N N N CO O N- N- CO Co 0) O _ r N N F— ao ao ao 0o o ao 0o co co 0 Q 0 S 0 z N- W O CO U 2 o Q J Q' U) W Z:3) - J O 0 CO U) (0 O W 0 @) U) 2 u) 2 W U) Z o co ZW o = m o WD d M U O N co W = J 00 O pp 2 b W Z < 0 O06 co O Ct M N U) rY Z 2 O O WZ m O Q LL -J W~C W ix Z � UO WowW D _ :F. - IY O J 0 Eo m 0 T v � _ Z m 0 7 O U) Q. ZZU 01 m Oa N Z < J v m2 -_I ti � cYSQ (nad z = 0 W > U) U) Z U s cal oHoDZ oM c Oo 000 - MU 2 0 JZ * Q 7 IXQ4. N '- m = * ,- M O O O -� * J m O � �nJpNUw � O � � * inp _O ( ' O U) * cn °- 2 < * t d4Z ~ Ij °' � -Icncn ©= m � p � � inm1--@)= oinr� � � XV) U) IC) O (N < Ce ,- 2 O 1 N L.L_ O Z U \ N Q_' U) C M ,- N W U) X - Q \ O 2O. 03 U LJJJ Z U) Z O 01 O (ToN 2 O Q Y = co O O N co W 0 V W I- O CO' co ao - 0 M J N N >+IX mW - WOJ_ cp-= OZ � � QZ >_ (Yc5ciCf) Cn. cUm � QU o @ao0OMM2 ,-- ff M W o ZMQ `� pW , = ZQ pu_ W J � dw Zpu_ 000pppz0 omU� \ .S < J U) Dm co I- HJ O OmD _I � a0 �❑ o Ucn = � U� Uoo >- oU� W (� D Zoo �@.9@9H ›-Cto D o d = OH W 0 D D _ = O H d W Ui Ui H - O_ Z U) W W LU 0 o m W W W D Z vd ZZ W WQm ZZaW U) C-) DH JZZ - U) U) Jp WZ Z 0 j Q O 001- 1- 1- 0- -I Z Z O O ~ m _ Z Z O H W D m m Z Z m m m o m O Z Z O x °6N xNNOO � UQl- W aNOO � bQbMN NOOJO . (xNNQO U - J - - 7 - 00 p W 071-_ __I > Ln U U m t� Q U U O ti u_ s- m4 ,- jv - vvmmZ - 000 ,04coco ''' c"' = MJd' 4mmN = = Z44Wm • Z Z Q Z Z Z Z (D CD Z H Q U Z Z R ° Z Z N F- J Z 2 Z ° C) Z Z Z O Z H O * Q Q Q Q Q Q * * Q W D Z W Q Q * * Q Q 7 W D Q J Q * * Q Q Q U Q W Q * C' Q_' U` CC CC rX Et : : U 0 o_ D rY ' c' : W' W' v C) 0 c U) Q' I' : CC Ct ct it r co —3 : O O O O O O O O N N N N t n coo co N N N N CO CO CO CO • • Q M N Ow O J Z p) U - in LdQ 0 ,, 2 0 0 c M � as _ _ W claO "pL +- *- Cl) cC cc) a) p CDN Q U O LU ��ll : - .Q O O > . z w N J CO d V COO - CO O Q-3 ° +-. J J cn c N — (DC4 a) u_Oi noon ° * J Q M N M O N L a) us U * D 0 — co la O O Z N 0) O O < J CO * co a) V' (s U _ L O ci 0_ (0 (>n a) O C7) Q M ---- LU > a' N Q CY M w �� M p Q O N 9 ez L' 0) (n cs z ce J d r' a.) 2 . a) O N z E Ca Q CO O p 3 a' p 0 O Qv) C * O s X N .c -p c W in' ) c O O * O X O O'C • 2 — 0 � � Cl) J � � c � (p arnE o_ a) E a) c � ami -- , * cs (s D O L o .E_ L c c O L (D U O c am' O • to OM UL O Q n M Z .� '4 J d c- — * cocM 0 a) v N C C O Q U O 0 H a) 06 •' cC `CO (s co pOp Q- N O H (n Q C/) N J J OO = N — a) _ `) O N a) (n 0 LU co a) O ~ Q Q O 2 c.. U H 2 N -80 - - 0 --_ cu O J H 0) co 0 C11 * 0 N Q (n II m o O = 0) co (a c X ci c ._ a)c 0 .c t d � \ u) io ( O00 � -0 �0 . 0c0 -0 = 00 0 � �4- 12 = a) v � * CO0. � � No II 3 0 � � * E uf°i °' Tu � m � o• o j a� fa co c 2 OQ Lu a) u) ZUa � •o _ � oM E rn� TD 0 0 A � � fn co *k -0 =- 2 0 O .2 0 _ i O 000 . i O VS 0Zzwo00M) � � -- 4- * is w � o ccs ° aa)) � is cn 0 < N c.)) CC/) N2 vi = 2ce2 (nw2o � VU -0 w � Q •-- O-- p) LH c QH z � � wWzNC° II LO cocN 0)� pCn � co � c a o) E c o � � U z ,_ QO < Z5J�u) ' o 2 coca (L- D .c `ra o 92 coca > � •� _c ami ~ m U O JHH0 (nLLU) 3 c C1 ct -§ -c 112, -c o p O Q mwo _i• a) -°a .- 03 p oa) 3 0 0 = O °� rnaa)i .c Y0 a) L Z' 0 3 N �' c 3 p N H H d 00 < z00 > D .> o (� � � }. D � o � E •co c-0- -rn (1' 0 mLL u) cQzzQ * > H L * L , Lt cl- 2 CZE co °O L0 a) � * * LU Cern : G W 2 : H > U) U < : co N J 2 0 2 7 0 a N 2 d co+*e * J J N (f) CO COO CO CO O O O O O O N N N N N N O) V O O N M M M co O(0 M M M r) M • . 0 J L O p c,4) L O C CO M C ( J p a LO 0 — co O -4-') N- 0 Co C CD « 07 O) \ N -C § a N CO O1 6j Q "O 11- co c N = 0 O �\ N u) Q- J 'C E N O W co ©�� v © 0 "_70 7 ) 10 _o -o * OU _ O 2 J E- ~ Lo 22 * N o II U * U U rY m co co 4- a 0 O 0 a-) w — L -a ca U (0 0 J J W 0) o_ (1) O7 a) a) 5 Q 0 - Lt c Z? Q Q 2 LL 0 * -j E d CO E w �' 4 * m 0( 6 92- d u) 1 C = _C 7 > fY o W J l.C) Z J a-) E O j Q Q N _1 * N O ca > N COOc6 (n * 0 W �(�1� W (n d ~ 0 E * Q EO `-' ILI m J MCY) F- = O N O O C J Z M F- > _ C Z �n � o W 2 . W oQ e > U a7) 3 Q -O — H ami a� Q U .- 1 p a) -0 II C -O J Q a) D < J - (n O C 3 U C Co - O CO 0 O Q O _ Q O o J Cl- p 0 C O _0 v Q M M M cn Q - U to 0 p ^M i• > Q * �-- a2 L.L. * * O ch N W LL Q °� 0 in ) N m 66 O in * CO W M �cn O O nH � < H a) oo m2o 1- Er U _ ovQ � w � Q N0o Opp Q0 a) co = %I � (A (nr� Jow M in m U a) O — > o O a)z v� J Z Q o J 5. O •cn O — IL (0 aa)) m a) U 0- IUi C * 4 - 0Q X moo O Q of = - C U a co- } W N Z CO N cn - 00 � � UJ M � I- > CC O a' 2 a 3 E -(-/-5 7:, coo a) 3 � > U � DHU O a CI I• Q O C w D U IQ-6 L › Q a7 'C V Q �' _ d J Ce E a) 3 H — E a,co E c H _ Q 2 2 w 0 o W LL a) -0 C 0 (7 O * 06 Q a) U .0)Z Q I- M O cM Q Q -O • ~ L o) N o °° ~ o - c>3 rn LOQO x °) - (INOZ U N in 0 ON O C (0 u) O O) u) LJL .O O E to N U Z N Q M + a) V) , Os Q LL (---3 _a Q O 3 p L C * Q m ~ N Q - ,- N () CO o 70 07 co ,-= * M O U M a7 a) (n 5' " 0 = 2 N M X F- ' Q O r M in -' H * Ln a) U a) a-' c x I- J i O 3 p O� co LL Q 0 co 60j p (0 C = O N M -- w .4 -- ,_ wJ C !Z fn U ?i i 0 ,_as i EO Q J Q M Q (O J O (N u) II u) N r- -O * O) O J m d U a) m W W o W 6) Y Y W W II N p- d 1_ Q d' 11 a) F8 * N O (n O .01— LEH ,- H (n m LO � O Q H N Q O O * f O) * f?- J W' J J H4O ,- LLJN > I- 4O .nOLiCCHI— I, JN * Qv) Q () W (nCC * --L O co _O co (0 O O CO O CD O o O O O N N N N N N N CO d CO N Nt NI- 4 V N M V cr • 0 , ± U_ ƒ \ O 2 0 7 ¥ / q \ 0 0 U D 0 CC I / / $ 0 u / 0 m G J 0 w 0 0 w \ z 0 L ± » < R L - 6 Cl) 0 H z 0- 0 ~ C / \ / 2 0 2 < „ I CI : % 0 0 \ 0 0 < (3 w I L 2 L R 0 0 O 3 O $ Q D 0 $ a O 0 0w a / 1 / < 2 i E E O H $ OZ ƒ I \ 0 C/) 0 ri c, « c \ / < $ 0 < » 2 - < Z % o < 2 U i A w0 / 0- 2 ■ a D 9 N ƒ LL L R w , 2 -1 2 E o ƒ 0 \ b % H U)CL Z- W 2U k D / 7 R r R O 0 E 0 ƒ 0 2 co \ ¢ 0 \ % - I- / � 2 $ � H XI k R ± Cno � < 5 2 O Z D < 2 0 Z u A E 3 C g E 0 0 I -' I ƒ L E ; t X m L - G 2 2 c a ± AxI I-- Li) � I � o i 0 \ 0 0 £ E 0 $ \ I \ / \ W 0 L % O Ip CL o / E CC / \ id ƒ w 0 - 0 \ / ƒ ® / 2 / °ƒ O \ K W ¥ 0 0 2 2 > � L / \ ƒ _ G � / \ r, / ® R / \ >1 \ / g 0 0_ a I a $ ® 2 E 0- 2 ƒ \ \ ■ \ / ¢ / / / (Ni / \ / 0 / \ / , % k CI mo a f / / 1- mm IbOwDD / / HCo / \ 2 O R L E © 2 x r (c) ILLIJ DW0 < ± � $ ? / 0 / / % / E �� I / 5 \ -I / U) Et Z O - / _ ' / - Z 0 0 / \ < 2 O U / f \ < 0E / �wZ © w ƒ kn / / a ƒ ƒ \ 0 � k \ 25 \ / % $ O m Z / / O O / O t k - ? 2 : 2 » - 2 < D O o 2 2 Z _i - D 2 0 Z - y o , .9 $ @ o ,, _ a I 0 O ± G 2 _ < < t t c . o E t z U O I o E e o dCV / / ooc ' \ \ 0] te n 4 4 TREE= F11.0 1AELLI-EAD.x ACEVOY • 03-27 SAFETY NOTES: 4-1/2-&5-1/2"CHROME ACTUATOR= BAKB2C ()di B_EV= 62' 8F.ELEV - KOP= 2750.' Mut Angle= 46° 7400' Datum AO= 10450' I I 2193 —5-1/2"I IM x NV,ij=4.562" Datum TVD= 8800'SS 13-3/8"CSG,72#,L-80,ID=12.347" H 2404' 5-1/2"TBG, 17#,13CR-80,.0232 bpf, =4.892' — 3535' / 3535' —5-1/2'X 4-1/2"X01 TOP OF 7'usiR 3660' ‘g' GAS LFT MANCRELS Minimum ID = 2.80" @ 10330' ST M3 DEV TY PE VLV AT FORT DATE 1 3882 3796 28 CA-KBG-2-LS DOME INT 16 04/27/15 4-112" MILLED XXN PLUG 2 6472 5786 42 CA-KBG-2-LS SO INT 24 04/27/15 3 7760 6704 46 CA-KBG-2-LS CMY INT 0 07/31/10 4 8713 7380 43 CA-KBG-2-LS DAY INT 0 07/31/10 7'SCAB LM 29#,L-80,.0371 bpf, ID=6.184" — 988T 5 9708 8160 27 CA-KBG-2-LS ['MY INT 0 07/31/10 TOP OF 7'LM' H 9887' 9946' --17"X 4-1/2"BKR S-3 FKR, =4.0" I I 9970' —4-1/2'HES X NP, =3.813" 4-1/2"TBG,12.6#,13CR-80,.0152 bpf, =3.958" — 9997 / 9997 —14-1/7'WLEG,1)=4,00" 9-5/8"CSG,47#,L-80,ID=8.681" — 10203 9966' —ELMD TT LOGGED 10/11/00' U TOP OF 4-1/2"TBG 10320' x— 10320' Hrx 41/2"BKR FB-1 Fl(R 111-- 10330' —4-1/2"HES XN Ni',MLLED THRU XXN PLUG w/2.80'ILL(03/31/16) 4-1/2'TBG, 12.6#,13CR-80,.0152 bpf,ID=3,958" — 10333' 10333' —4-1/2'WLEG,13=40" 10331' HELIAD TT NOT LOGGED PERFORATION S1M4ARY REF LOG BHCS ON 05/15/84 ANGLE AT TOP PERE: 15 @ 10224' Note:Refer to Production CB for historical perf data 10366'CTM —FISH:BOT 2.80"OD X.44'LONG LEFT SIZE SFF MEI:NAL Oprt/Sqz DATE HANDED DLA MOM)PA RA BOUC MLL SEE F1CS N WBLS FOLDER(03/27/16) SEE PAGE 2 FOR PERFORATION DATA 10394' — TOP OF CEMENT WOW.' II.•••••• ••••••• 10503' — TOP OF SAM) 11 PBTD — 10773' "MAW, ve,e,eaveave: 7"LNR,29#,L-80, 0371 bpf,ID=6.184" H 1081T DATE REV BY COMENTS DATE REV BY CCSAIENTS PRUDHOE BAY UNT 05/21/94 ORIGINAL COMPLETION 04/28/16 CIS/..M5 HITS TO MLLED XXN RUG(03/31/1 WELL 03-27 04/2W00 LAST WORKOV 04/28/16 CJS/M)ADITRFS(04/25-26/16) PERMIT No,)840620 05/04/15 RCT/JM3 GLV 00(04/27/15) AR ND: 50-029-21109-00 09/08/15 JLS/JM) REMOVED SAND(08/16/15) SEC 11,T1ON,R15E,78fY FSL&21'FW 09/08/15 SWCJJIC ACCIE)XXN PLUG FROM 2001 04t05/16 JTC./..1MD MLLED RUG/SET FISH(3/27/16) — BP Exploration(Alaska) I • 03-27 IA L I I PERFORATION SUROAARY REF LOG:BRCS ON 05/15/84 ANGLE AT TOP PEW: 15 @ 1025(Y Note:Refer to Production DB for historical perf data SIZE SFF INTET2VAL Opn/Sgz DATE 3-1/8" 4 10224- 10262 S 04/25/88 3-3/8" 6 10230- 10250 0 04/26/16 3-3/8" 6 10250- 10280 0 03/13/01 2-1/8" 4 10250- 10282 0 10/18/94 2-1/8" 4 10270- 10282 S 01/15/89 2-1/8" 6 10270- 10282 S 06/19/92 2-1/7 4 10270- 10282 S 06/19/92 2-1/2" 4 10270- 10282 S 10/14/94 I 2-1/2' 4 10286- 10292 S 10/14/94 2-1/8" 4 10286- 10308 0 10/18/94 / 3-3/8" 6 10290- 10318 S 04/25/88 2-1/8" 4 10290-10318 S 01/15/89 . .' 2-1/8" 6 10290- 10318 S 06/19/92 2-117 4 10290- 10318 S 06/19/92 2-1/7 4 10298- 10310 S 10/14/94 2-1/7 2 10350- 10360 S 10/14/94 II 2-1/7 6 10350- 10355 0 04/25/16 2-1/7 6 10352- 10357 0 04/25/16 2-1/7 4 10368- 10378 S 06/19/92 2-1/7 2 10381 - 10398 S 10/14/94 2-1/7 4 10388- 10398 S 06/19/92 /4 Pr 3-3/8" 1 10503- 10578 S 04/25/88 3-3/8" 1 10547 - 10569 S 04/25/88 3-3/8" 1 10588- 10602 S 04/25/88 Ilk I I 1.4.•1144.1.64 DATE REV BY C0 JU4TS DATE REV BY comuNTS I PRICHOE BAY UNT 05/21/84 ORIGINAL COMPLETION 04/28/16 CJS/AD EDITS TO AILED XXN PLUC;(03/31/1 MIL 03-27 04/20/00 LAST WORKOVER 04/28/16 CJS/JM) ADPERFS(04/25-26/16) F'B214.4T No:'1840620 05/04/15 RCT/JM)GLV C'O(04/27/15) AR No: 50-029-21109-00 09/08/15 JLS/JMU REMOVED SAM)(08/16/15) SEC 11,T101,R15E 78(Y FSL&21'F W 09/08/15 SWCJJAC ADDED XXN PLUG FROM 2001 04/05/16 JTCIJM) M1®FLUC3/SET FISH(3/27/16) IP Exploration(Alaska) Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Wednesday, April 29, 2015 6:47 PM To: AK, OPS FS2 OSM; AK, OPS FS2 DS Ops Lead;AK, OPS FS2 Facility OIL;AK, OPS FS2 Field OTL;AK, OPS PCC EOC IL;AK, D&C Wireline Operations Team Lead;AK, D&C Well Services Operations Team Lead; Cismoski, Doug A;AK, RES GPB East Wells Opt Engr;AK, OPS EOC Specialists; Daniel, Ryan;AK, RES GPB West Wells Opt Engr; G GPB FS2 Drillsites; Sinnok, Ralph;Wallace, Chris D (DOA) Cc: AK, D&C DHD Well Integrity Engineer;AK, D&C Well Integrity Coordinator;AK, D&C Projects Well Integrity Engineer;AK, OPS FF Well Ops Comp Rep; Regg,James B (DOA) Subject: OPERABLE: Producer 03-27 (PTD #1840620) MIT-IA Passed Attachments: image001.png; image002.png; Producer 03-27 (PTD#1840620)TIO Plot.docx All Producer 03-27(PTD#1840620) passed an MITIA on 04/27/2015 following gas lift valve work. The passing test confirms two competent barriers in the wellbore. The well is reclassified as Operable. • Well status is Operable • Annuli are fluid packed • A SSSV is not required Please use caution while placing the well on production due to fluid packed annuli and the potential for annular fluid expansion. A copy of the TIO plot is included for reference. Thank you, Kevin Parks •ANs`ED MA' 0 4 2U15 (41k)))(! f 4IIIOU V PCNLIC) BP Alaska-Well Integrity Coordinator GI �/N Global Wells Organization Office: 907.659.5102 WIC Email:AKDCWeIlIntegrityCoordinator@bp corn From: AK, D&C Well Integrity Coordinator Sent: Thursday, March 12, 2015 4:11 PM To: AK, OPS FS2 OSM; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS FS2 Field OTL; AK, OPS PCC EOC TL; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; Cismoski, Doug A; AK, RES GPB East Wells Opt Engr; AK, OPS EOC Specialists; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; G GPB FS2 Drillsites; Vohra, Prachi; 'chris.wallace@alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; 'jim.regg@alaska.gov' Subject: NOT OPERABLE: Producer 03-27 (PTD #1840620) Inner Annulus exceeded MOASP 1 All, Producer 03-27 (PTD# 1840620) inner annulus pressure exceeded MOASP on 03/09/15. The pressures were reported to be 2300/2250/640. The well failed a cold TIFL on 03/11/15.The failing TIFL indicates a lack of two competent barriers in the wellbore. This well is not currently available to be brought online due to surface constraints and upcoming rig operations. This well has been reclassified as Not Operable until further diagnostics can be performed. The plan forward is: 1. Slickline: Set TTP, MIT-T, CMIT-TxIA Please let me know if you have any questions or concerns. Thank you, Whitney Pettus (Alternate:Kevin Parks) BPSAlaska' -Well Integrity Coordinator G WIC Office: 907.659.5102 WIC Email: AKDCWeIIIntegntyCoordinatorPBP.com 2 • • Producer 03-27 (PTD #1840620)TIO Plot Well 01 71 .x< +Tec -0- (00 a ..00 OP + �a 0229',5 131;115��S UG2.15 00,5 014.150.1ii:15 9..015 041015 Wluti D.11615615 M'815 6420.15 0122152�e Jl]115 a15 N.16.'S Ja:S" Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Thursday, March 12, 2015 4:11 PM To: AK, OPS FS2 OSM;AK, OPS FS2 DS Ops Lead;AK, OPS FS2 Facility OTL;AK, OPS FS2 Field OTL;AK, OPS PCC EOC IL;AK, D&C Wireline Operations Team Lead;AK, D&C Well Services Operations Team Lead; Cismoski, Doug A;AK, RES GPB East Wells Opt Engr;AK, OPS EOC Specialists; Daniel, Ryan;AK, RES GPB West Wells Opt Engr; G GPB FS2 Drillsites;Vohra, Prachi;Wallace, Chris D (DOA) Cc: AK, D&C DHD Well Integrity Engineer;AK, D&C Well Integrity Coordinator;AK, D&C Projects Well Integrity Engineer; Regg,James B (DOA) Subject: NOT OPERABLE: Producer 03-27 (PTD#1840620)Inner Annulus exceeded MOASP Attachments: Picture (Device Independent Bitmap) ljpg All, Producer 03-27 (PTD# 1840620) inner annulus pressure exceeded MOASP on 03/09/15. The pressures were reported to be 2300/2250/640. The well failed a cold TIFL on 03/11/15.The failing TIFL indicates a lack of two competent barriers in the wellbore. This well is not currently available to be brought online due to surface constraints and upcoming rig operations. This well has been reclassified as Not Operable until further diagnostics can be performed. The plan forward is: 1. Slickline: Set TTP, MIT-T, CMIT-TxIA %A INE() ;: :,r, s ; Z. Please let me know if you have any questions or concerns. Thank you, Whitney Pettus (Alternate. Kevin Parks) BP Alaska-Well Integrity Coordinator WIC Office: 907.659.5102 WIC Email: AKDCWelIIntegrityCoordinator@BP.com 1 Ima~'roje~t Well History File' Coverage XHVZE This page identifies those items that were not scanned during the initial production scanning., phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. J ,~¢-~.~'_ Well History File ldentifier Organizing (done) RESCA. N ~Color items: DIGITAL DATA' Diskettes, No. Grayscale items: Poor Quality Origi hals: D Other, NoFFy ~pe Other: NOTES: BY: BEVERLY BREN VINCENT SHERY~..~)LOWELL OVERSIZED (Scannable) [] Maps: Other items scannable by large scanner OVERSIZED (Non-Scannable) Logs of various kinds [] Other DATE: ?(~'(~-- IS/ Project Proofing BY: BEVERLY BREN i~SHERYL MARIA LOWELl. Scanning Preparation 'L'~x 30 :C-~/~) BEVERLY BREN ~SHERYL MARIA LOWELL -I-~- : TOTAL PAGE~~_ D AT E////~ /SI ~ -- Production Scanning Stage 1 PAGE COUNT'FROM SCANNED FILE: C:~ ~'"~C~ PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATIOI~: '~/'~YES NO Stage 2 IF NO IN STAGE 1, P_A.,GE(S) DISCREPANCIES WERE FOUND: , ~ YES.~ ~,..__ NO V RESCANNEDBY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE; /SI .~eneral Notes or Comments about this file: Quality Checked (done) • • Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [AKDCWeIIlntegrityCoordinator @bp.com] 'Rep Sent: Sunday, July 29, 2012 4:09 PM To: Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS FS2 OSM; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS PCC EOC TL; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; G GPB FS2 Drillsites; AK, OPS GC1 OSM; AK, OPS GC1 Field O &M TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Dos Santos, Higino W; Duong, Lea Cc: AK, D &C Well Integrity Coordinator; Walker, Greg (D &C); Clingingsmith, Mike J; AK, D &C DHD Well Integrity Engineer; Wills, Shane M; Arend, Jon (NORTHERN SOLUTIONS LLC) Subject: NOT OPERABLE: Producers with Sustained Casing Pressure During Proration All, The following producers were found to have sustained casing pressure on the IA during proration. The immediate action is to perform a TIFL on each of the wells to evaluate or repressurization. If the wells fail the TIFL, a follow up email will be sent to the AOGCC for each individual well with a plan forward. 03 -20A (PTD #1930470) 03 - 21 (PTD 1 R:1112n SCANNED t1AY 0 2 2013 03 -27 (PTD #1840620) F -35 (PTD #1880810) All the wells listed above are reclassified as Not Operable until start-up operations commence and are stable or the well passes a pressure test confirming integrity. After start-up, the wells will be reclassified as Under Evaluation with POP parameters to prevent any over - pressure incidents if integrity has not been confirmed. Please call with any questions or concerns. Thank you, Gerald Murphy (alt. Mehreen Vazir) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 Email: AKDCWeIIlntegrityCoordinator (a,BP.com 1 • i bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 — d 2 O3Ja� Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7 Avenue 6 Avenue 7017 Anchorage, Alaska 99501 SA N O R 4 FPM 1 i 1en11SSU:' !� Subject: Corrosion Inhibitor Treatments of DS -03 ; -; . Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from DS -03 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, SidikittiEOFEB ,(1,' a)12 Mehreen Vazir BPXA, Well Integrity Coordinator 0 0 BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10-404) DS -03 10/26/11 Corrosion Initial top of Vol. of cement Final top of Cement top Corrosion inhibitor/ Well Name PTO # API # cement pumped cement off date inhibitor sealant date ft bbls ft gal 03 -01 1750750 50029200930000 Sealed conductor NA NA NA NA NA 03 -02 1760240 50029202030000 Sealed conductor NA NA NA NA NA 03 -03 1760390 50029202110000 Sealed conductor NA NA NA NA NA 03-04 1760510 50029202180000 Sealed conductor NA NA NA NA NA 03-05 1760570 50029202220000 Sealed conductor NA NA NA NA NA 03-06 1760600 50029202240000 Sealed conductor NA NA NA NA NA 03 -07A 2040430 50029202200100 Sealed conductor NA NA NA NA NA 03-08 1760730 50029202310000 Sealed conductor NA NA NA NA NA 03-09 1790220 50029203620000 Sealed conductor NA NA NA NA NA 03 -10 1790210 50029203610000 Sealed conductor NA NA NA NA NA 03-11 1790470 50029203830000 Sealed conductor NA NA NA NA NA 03-12 1790580 50029203920000 Sealed conductor NA NA NA NA NA 03-13 1790710 50029203990000 Sealed conductor NA NA NA NA NA 03-145 2090020 50029204070200 Sealed conductor NA NA NA NA NA 03-15A 1930150 50029204140100 Sealed conductor NA NA NA NA NA 03 -16A 1970330 50029204150100 Sealed conductor NA NA NA NA NA 03-17 1791020 50029204200000 Sealed conductor NA NA NA NA NA 03 -18A 1930420 50029204210100 Sealed conductor NA NA NA NA NA 03-19 1830920 50029209710000 0.3 NA 0.3 NA 1.7 7/312010 03-20A 1930470 50029209800100 6.2 NA 6.2 NA 40.8 8/2/2010 03 -21 1831120 50029209900000 6.6 NA 6.6 NA 49.3 8/32010 03 -22 1831230 50029210000000 0.0 NA 0 NA 7.7 10/2612011 03 -23 1831270 50029210040000 >25 21.0 0.8 7/15/2011 5.1 7/18/2011 03-24A 1980060 50029210150100 1.3 NA 1.3 NA 8.5 9/16/2010 03-25A 1930230 50029210210100 >25 12.0 2.25 7/12/2011 13.6 7/172011 03-26 1831510 50029210270000 0.2 NA 0.2 NA 0.85 822010 "-'0' 03 -27 1840620 50029211090000 23.5 5.0 0.4 7/12/2011 3.4 7/172011 03 -28 1840720 50029211140000 55.0 17.0 0.4 7/12/2011 3.4 7/17/2011 03 -29 1840790 50029211180000 6.0 NA 6 NA 20.4 8/3/2010 03-30 1840830 50029211220000 4.4 NA 4.4 NA 22.5 8/3/2010 03-31 1840920 50029211290000 10.0 NA 10 NA 113.9 8/3/2010 03-328 2090050 50029211410200 1.5 NA 1.5 NA 8.5 7/30/2010 03-33B 2050180 50029211420200 7.8 NA 7.8 NA 57.0 7/30/2010 03-348 2000110 50029211320200 0.2 NA 02 NA 9.4 10/26/2011 03 -35 1910800 50029221840000 5.8 NA 5.8 NA 39.1 7/28/2010 03-36A 2070200 50029223400100 1.5 NA 1.5 NA 3.4 7/28/2010 03 -37 2091390 50029234210000 2.5 NA 2.5 NA 16.2 _ 8/2/2010 ~~~ ~ ~~~~~~ ~,. PaoAcnve DiAC~nasTic SeevicES, Inc. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper/ MTT] The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2-1 900 Benson Blvd. Anchorage, Alaska 99508 and ~~~'~~ ~= ~~ ~ z ~ 01 ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 i I~CI~O~a ~~ ~~~ 1) Leak Detection - STP 17-Jan-10 03-27 2) Signed Print Name: 1 BL/ EDE 50-029-2 1 1 09-00 ;, - ~,;, Date PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-88952 E-MAIL. _ ~u~ ?~y~`~ - WEBSITE X11,..;; ~ _ ~ __ C:`.Documenls and Sittings'+Diane Williams\Desktop\Trarumit_BP.docx ` STATE OF ALASKA ' ALA OIL AND GAS CONSERVATION COM LION REPORT OF SUNDRY WELL OPERATIONS RECEIVED MAl~ 1 4 2006 1. Operations Abandon ^ Repair Well Q Plug Perforations ^ Stimulate ^ a $i I aS Can3. Commj$Sj Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver^ Time Extension ^pnChorage Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-enter Suspended Well ^ 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development ~ Exploratory 184-0620 3. Address: P.O. Box 196612 Stratigraphic ~ Service 6. API Number: Anchorage, AK 99519-6612 50-029-21109-00-00 7. KB Elevation (ft): 9. Well Name and Number: 62 KB 03-27 8. Property Designation: 10. Field/Pool(s): ADL-028328 PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: Total Depth measured 10826 feet Plugs (measured) 9928 PX true vertical 9225.19 feet Junk (measured) None Effective Depth measured 10773 feet true vertical 9174.09 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20"91.5# H-40 33 - 113 33 - 113 1490 470 Surface 2372 13-3/8"72# L-80 32 - 2404 32 - 2403.46 5380 2670 Production 10172 9-5/8" 47# L-80 31 - 10203 31 - 8623.63 6870 4760 Liner 930 7" 29# L-80 9887 - 10817 8323.25 - 9216.51 8160 7020 Liner 6237 7" tieback 3650 - 9887 3590.01 - 8323.25 Perforation depth: Measured depth: 10250 - 10282 10286 - 10308 True Vertical depth: 8669.09 - 8700.02 8703.88 - 8725.12 Tubing: (size, grade, and measured depth) 5-1/2" 17# 13CR80 30 - 3535 4-1/2" 12.6# 13CR80 3535 - 9992 4-1/2" 12.6# 13CR80 10320 - 10333 Packers and SSSV (type and measured depth) 4-1/2" Baker S-3 Pkr 9946 4-1/2" Baker FB-2 Pkr 10320 12. Stimulation or cement squeeze summary: Intervals treated (measured): ' ' ' Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: shut-in Subsequent to operation: 310 76 6077 200 327 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory ~' Development ~' Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~' Gas ~ WAG GINJ WINJ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Sharmaine Vestal Printed Name Sharmaine Vestal Title Data Mgmt Engr ~-- Signatt~'r~~ Phone 564-4424 Date 3/13/2006 Form 10-404 Revised 04/2004 ~ ` ~ ~~ MAR l 5 2006 ~..,, . ~ ~ ~ ~~ ~ L Submit Original Only 03-27 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 2/13/2006 T/I/O = 100/100/10. Temp = SI. Bradenhead weld. OA FL @ 60'. Bled OAP to 0 psi in 10 min. Bled TBG pressure and IA pressure to 0 psi in 20 min. Made 3 passes on upper and lower Bradenhead. Final WHP's = 0/0/0. FLUIDS PUMPED BBLS 0 TOTAL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _X (FI:lAC) Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__X RKB 62 feet 3. Address Explorato~ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 4497' FNL, 5258' FEL, Sec. 11, T10N, R15E, UM (asp's 713298, 5936820) 03-27 At top of productive interval 9. Permit number / approval number 91' FNL, 5208' FEL, Sec. 11, T10N, R15E, UM (asp's 713218, 5941228) 184-062 At effective depth 10. APl number 50-029-21109 At total depth 11. Field / Pool 5216' FNL, 5173' FEL, Sec. 2, T1 ON, R15E, UM (asp's 713247, 5941382) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 10826 feet Plugs (measured) Tagged PBTD @ 10297' on 3/26/2001. true vertical 9225 feet Plug set @ 10330' MD on 3/11/2001. Effective depth: measured 10297 feet Junk (measured) true vertical 8714.5 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 80' 20" 185o# Poleset 80' 80' Surface 2342' 13-3/8" 20o0 Sx cs ~u & 400 Sx cs u 2404' 2403' Production 10141' 9-5/8" 5o0 Sx C~ass G & 300 Sx CS ~ 10203' 8624' Liner 927' 7" 340 Sx C~ass G 1 0817' 9217' Liner Tieback 6222' 7" Liner tieback 9890' 8326' RECEIVED Perforation depth: measured 10250'- 10282'; 10286'- 10308'. APR 2 ? ZOO/ true vertical 8669' - 8700'; 8704' - 8725'. Alaska 0il & Gas Cons. Commission Tubing (size, grade, and measured depth) 5-1/2", 17#, 130R @ 3535' MD; 4-1/2", 12.6#, 130R @ 9992' MD; 4-1/2", 12.6#, 130R @ 10334' MD. Packers & SSSV (type & measured depth) 7" X 4.5 BAKER FB-1 PACKER @ 10320' MD; 7" X 4.5 BAKER S-3 PACKER - ID 4 @ 9946' MD. 5-1/2" HES X NIPPLE @ 2193' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 182 13 1247 - 283 Subsequent to operation 1052 2153 6632 - 327 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations ._X Oil __X Gas __ Suspended __ Service 17. I hereby certi~ t,~3a,,,t the foregoing is true and correct to the best of my knowledge. Signed Title: DS 3 Surveillance Engineer Date April 23, 2001 Danielle Ohms Prepared by Paul Rauf 564-,5799 ~? Form 10-404 Rev 06/15/88 · ORIGINAL SUBMIT IN DUPLICATE 03-27 DESCRIPTION OF WORK COMPLETED HYDRAULIC FRACTURE TREATMENT & PERFORATING OPERATIONS Date Event Summary 3/06/2001 - 3/11/2001: 3/12/2001: 3/13/2001: 3/14/2001: 3/15/2001: 3/17/2001 - 3/18/2001: Dummied GLV's. MITIA to 3000 psi - passed. Ran PDS Spinner, CCL, Temp & press gauge. Set Plug @ 10330' MD in the 4-1/2" XN Nipple. RIH & dump bailed 30 gal of CaCO3 / sand on top of plug. MIRU ELU. PT'd equip. RIH w/3-3/8" PJ perf guns & re-perforated 30' of section @: 10250' - 10280' MD (Zone 4) Reference Log: BHCS 5/15/1984. All shots @ 6 SPF, 60° phasing, & random orientation. POOH w/guns - ASF. RD ELU. MIRU. PT'd equip to 9000 psi. Attempted a FB Hydraulic Fracture Treatment using 12/18 mesh ceramic proppant through the target perforations listed below: 10250' - 10282' MD (Zone 4) 10286' - 10308' MD (Zone 4) Pumped: (a) 254 bbls 20# Gelled Pre-Pad @ 40-45 bpm, followed by shutdown. ISIP = 1630 psi. (b) 205 bbls 40# Crosslinked Gelled Pad @ 45 bpm, followed by (c) shutdown - job aborted due to leaking seal on treesaver. Performed a FB Hydraulic Fracture Treatment using 12/18 mesh proppant as follows: Pumped: (a) 250 bbls 20# Gelled Pre-Pad @ 10-45 bpm, followed by (b) Shutdown. ISIP = 1705 psi. (c) 350 bbls 40# Crosslinked Gel @ 45 bpm, followed by (d) 191 bbls 20# Linear Gel Flush @ 30 bpm, followed by (e) Shutdown. ISIP - 1986 psi. Resumed pumping Frac Treatment: (f) 500 bbls 40# Crosslinked Pad @ 45 bpm, followed by (g) 993 bbls Crosslinked Slurry @ 45 bpm w/proppant stages @ 1-10 ppg, followed by (h) 183 bbls Flush @ 45 bpm, followed by (i) Shutdown. Under-displaced by 7 bbls, leaving 4400 lbs of proppant in the wellbore. Placed a total of 153000 lbs into FM. Max proppant concentration placed was 10 ppg. Est sand top ~ 10066' MD. Max treatment press = 4152 psi. Ave treatment press - 3465 psi. RD. MIRU CTU. PT'd equip. Performed FCO to 10265' MD. Lost returns. RD CTU. Page 1 O3-27 DESCRIPTION OF WORK COMPLETED HYDRAULIC FRACTURE TREATMENT & PERFORATING OPERATIONS Date Event Summary 3/19/2001 - 3/22/2001- 3/25/2001- 3/26/2001- 3/27/2001 - 3/30/2001- 3/31/2001- Pulled dummied GLV's. Ran GLV design. RIH & tagged Frac sand @ 9532'. Performed FCO to 10297' w/CTU. Well BOL via APC portable test separator. APC preformed Frac flowback. Placed well BOL. 1ST well test performed on 4/02/2001. Page 2 U3/14/ZUU1 16:41 F_&~ 907 564 4Z64 BP EXPLORATION _~,~-,-.,~. bp BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 March 14, 2001 Julie Heusser, Dan Seamount, & Cammy Oechsli Taylor Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, AK 99501 Fax 276-7542 Dear Commissioners: Re: Prudboe-EOA, Pt. Mac, & Lisbume Well Work This listing is provided as required under the terms of Conservation Order No. 34 lC (Rule 14) & Order No, 342. This is a list of well work tentatively scheduled for March 12 - 19, 2001: Well 03-28 05-18A 12-15 13-27A 16-21 NK-65i S-101 S-103 Work Planned REPERFORATION / HYDRAULIC FRACTURE TREATMENT REPERFORATION CTE ADD PERFORATION SAG HYDRAULIC FRACTURE TREATMENT CT ADD PERFORATION W! WORK PLATFORM REPERFORATION CTE ADD PERFORATION ADD PERFORATION INITIAL PERFORATION If additional data or scheduling information is needed, please call me at 564-5799 or E-mail me at raufpc @bp.com. Sincerely, Paul C. Rauf Technical Assistant, BPXA Alaska Drilling & Wells 1.5 2001 09:05PM BP MILME POIMT ~ROUP BP Exploration Endicott Well Operation8 Sunday I~lickiir~:-~... ~Other: 2/25 4-10 1-47 Dummy off GLV~s a'r[~l drift tubin,g to 3.625" Leak detection water flow Icg Mond~ lI$1ickline: -E:li.n.e.: Other', 2/26 3-25 2-14 Pull SSSV, drift with dumr~¥ w.h.i, pstock Water flow Icg_. Tuesday Slickline; E*line: Other: 2/27 3-2.5 Run static pressure survey 3-39 gas-lift survey & FSPL 1-05, 2-12, 3-45, 4-10, 5-01 & 5-02 MIT's w/AOGCC witness Wednesday 2/28 ISlickline: 1-25 Other: '_Thursday 3/01 ISlickline: 1-25 Other: 2-56 Brush, Flush & pull .S..6$V;'~hhtUbing Caliper sUrvey tul~i~g & line~: PFO .il .F.r.!.d..a¥ 3/O2 ISIickline: Oth?! 1-25 Static pressure survey Saturday $1ickline; Other~ 3/04 1-21 Calip~_r__su~vey of tubing. 1-25 I njeetivity test MEMORANDUM TO: Julie Heusser, Commissioner THRU: State of Alaska ,Alaska Oil and Gas Conservation Commission . . Tom Maunder, P. I. SuPervisor DATE: FROM:. John Crisp, SUBJECT: Petroleum Inspector January 15, 2001 Safety Valve Tests Prudhoe Bay Field Drill Site 03 JanUary 15, 2001' I traveled to BP's Prudhoe Bay Field to witness Safety Valve System teSts on DS 03. Mark Womble was BP representative in charge of testing DS 03. Testing had been canceled on DS 03 1-14-01 due to blowing snow & chill factor of-50 degrees. Testing was Conducted in a safe & efficient manner. Two failures were witnessed. The AOGCC test report is attached for reference.. 21 wellhouses were inspeCted during SVS tests. Wellhouses are in fair condition considering these were inspected after our recent blow. No heat or lights are installed in Wellhouses for producing wells. SUMMARY: I Witnessed SVS tests in PBU on DS 03. 21 wells, 42 components tested. 2 failures witnessed. 4.8% failure rate. 21 wellhouses inspected. Attachments: SVS PBu DS 03 1-15-00jc cc; NON-CONFIDENTIAL SVS PBU DS 03 1-15-01jc.doc Alaska Oil and Gas Conservation Commission Safety Valve System Test RepOrt Operator: BpX Operator Rep: Mark Womble AOGCC Rep: John Crisp Submitted By: John Crisp Date: Field/Unit/Pad: .Prudhoe Bay Field DS 03 Separator psi: LPS 185 HPS 1/15/01 69O Well Permit Separ set L/P Test Test Test Date oil, WAg, a~J, NUmber NUmber PSI PSI .Trip Code Code Code Passed GAS or CYCLE 03-01 1750750 185 150 100 P P OIL 03-02 1760240 185 150 ~ 120 P P OIL 03-03 1760390 185 150 110 P P OIL 03-04 1760510 03-05 1760570 03-06 1760600 03-07 1760530 03-08 1760730 185 150 130 P ? OIL 03-09 1790220 185 150 100 P P OIL 03-10 1790210 03-11 1790470 03-12 1790580 03-13 1790710 · 03-14 -1790820 185 150 100 P P OIL 03-15A 1930150 185 150 100 P P OIL 03-16A '1970330 03-17 1791020 03.18A 1930420 03-19 1830920 185 150 90 P P OIL 03-20A 1930470 185 150 100 P P OIL 03-21 1831120 185 150 100 P P OIL 03-22 1831230 690 600 420 P P OIL 03-23 1831270 185 150 0 t P OIL 03-24A 1980060 - 690 600 530 P P OIL 03-25A 1930230 03-26 1831510 185 150 I10' P P OIL 03-27 1840620 185 150 100 P P OIL 03-28 1840720 03-29 1840790 185 150 110 P P OIL 03-30 1840830' 1851 150! 90 P P OIL ,, 03-31 1840920 185 150~ 140 P P OIL I 03-32A 1940540 185~ 150 110 P P OIL 03-33A 1970390 i03-34B 2000110 185 150 0 1 P OIL ~/~e/al Paee 1 of 2 SVS PBU DS 03 1-15-01c.xls Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Trip COde Code Code' Passed GAS or CYCLE 03-35 1910800 185 150' 90 P P OIL 03-36 19301901 Wells: 21 ComPonents: 42 Failures: · 2 Failure Rate: 4.8% [] 9o var Remarks: ....... Do,,,~ '~ ,~c9 SVS PBU DS 03 1-15-01c.xls STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) ARCO Alaska Inc. [] Development RKB = 62' [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Prudhoe Bay Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Well Number 780' NSL, 21' EWL, SEC. 11, T10N, R15E, UM RECEIVED 03-27 At top of productive interval 9. Permit Number / Approval No. 184-062 5188' NSL, 72' EWL, SEC. 11, T10N, R15E, UM 10. APl Number At effective depth ~/~,/~Y '~ 0 2000 50-029-21109-00 5223' NSL, 81' EWL, SEC. 11, T10N, R15E, UM 11. Field and Pool At total depth Alaska 0{I & Gas Cop, s, Co~.~i.~ior,~ Prudhoe Bay Field / Prudhoe Bay 62' NSL, 104' EWL, SEC. 02, T10N, R15E, UM ~ch0rage Pool 12. Present well condition summary Total depth: measured 10825 feet Plugs (measured) Sand Plug with cement cap at 10394' (09/94) true vertical 9224 feet Effective depth: measured 10362 feet Junk (measured) true vertical 8777 feet Casing Length Size Cemented MD TVD Structural Conductor 80' 20" 1850 # Poleset 80' 80' Surface 2404' 13-3/8" 2000 sx CS III, 400 sx CS II 2404' 2403' Intermediate 10203' 9-5/8" 500 sx Class 'G', 300 sx CS I 10203' 8624' Production Liner 927' 7" 340 sx Class 'G' 9890' - 10817' 8326' - 9217' 7" Liner Tieback 6222 7" Liner Tieback 3668' - 9890' 3606' - 8326' Perforation depth: measured Open Intervals: 10250' - 10282', 10286' - 10308' Sqzd Gross Intervals: 10224'- 10250', 10308'- 10602' true vertical Open Intervals: 8669' - 8700', 8704' - 8725' Sqzd Gross Intervals: 8664'- 8669', 8725'- 9009' Tubing (size, grade, and measured depth) 5-1/2", 17#, 13Cr to 3535'; 4-1/2", 12.6#, 13Cr to 9992'; 4-1/2", 12.6#, 13Cr 10320' - 10334' Packers and SSSV (type and measured depth) 5-1/2" SSSV 'X' Nipple at 2193'; 4-1/2" Baker S-3 packer at 9946'; 7" x 4-1/2" Baker FB-1 Isolation packer at 10322' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Attachments 16. Status of well classifications as: [] Copies of Logs and Surveys run [] Oil [] Gas [] Suspended Service [] Daily Report of Well Operations 17. I hereby certify that the foregoing is true and correct to the best of my knowledge . i ,1 ,1,,,, S,.qned Terrie Hubble ' ,l,~J'~"~/,~-, - Title Technical Assistant III Date ~S - / 0 -(.~ Prepared By Name/Number Terrie Huddle, 564-4628....% Submit In Duplicat~,~ .~ Form 10-404 Rev. 06/15/88 Facility PB DS 03 Progress Report Well 03-27 Page 1 Rig Nabors 9ES Date 11 April 00 Date/Time 24 Mar 00 25 Mar 00 13:30-21:30 13:30-21:30 21:30 21:30-22:00 21:30-22:00 22:00 22:00-23:45 22:00-23:45 23:45 23:45-02:00 23:45-00:30 00:30 00:30-02:00 02:00 02:00-03:30 02:00-03:30 03:30 03:30-06:00 03:30-04:30 04:30 04:30-06:00 06:00 06:00-17:00 06:00-10:00 10:00 10:00-11:30 11:30 11:30-15:30 15:30 Duration 8hr 8 hr 1/2 hr 1/2 hr 1-3/4 hr 1-3/4 hr 2-1/4 hr 3/4 hr 1-1/2 hr 1-1/2 hr 1-1/2 hr 2-1/2 hr 1 hr 1-1/2 hr llhr 4 hr 1-1/2 hr 4 hr Activity Move rig Rig moved 100.00 % Derrick up rig move around the reserve pit from DS3-34B to DS3-27B. Laid Herculite under the sub base only. Pre-rig pad inspection complete. Center rig over the well. At well location - Re-spud location ***ACCEPT RIG AT 21:30 hrs, 3/24/00.*** Wellhead work Rigged up High pressure lines NU secondary annulus valve to the tree, connect circulating lines. Equipment work completed Fluid system Fill pits with Seawater 500 bbls Completed operations Wellhead work Held safety meeting Pre-spud safety meeting with both crews: well objectives, H2S, last well performance, non-routine operations. Completed operations Removed Hanger plug RU DSM lubricator and pull BPV. RD same. Well static and full. Equipment work completed Fluid system Circulated at 3158.0 ft Test lines to 3500 psi, reverse out 35 bbls Diesel from the tubing, circulate 70 bbls from the annulus. Diesel ship to flow station for reclaimation. Circulation through open GLM at 3158'. Hole displaced with Seawater - 70.00 % displaced Wellhead work Rigged down Hanger plug Install BPV. Test via annulus to 500 psi. Equipment work completed Removed Xmas tree ND tree and adapter flange. Inspect tubing hanger running threads and LDS. Install BPV blanking plug. Equipment work completed Nipple up BOP stack Rigged up BOP stack NU BOP stack, change top rams to 2-3/8". Stopped: To test equipment Tested Blind ram Test blinds, choke, manual valves to 250/3500 psi. Test witness waived by John Spaulding, AOGCC. Pressure test completed successfully - 3500.000 psi Rigged up Variable ram Change bottom rams to 3-1/2" x 6" VBR and test same 250/3500. Equipment work completed Facility PB DS 03 Date/Time 15:30-17:00 17:00 17:00-00:30 17:00-00:30 26 Mar 00 00:30 00:30-06:00 00:30-01:30 01:30 01:30-02:00 02:00 02:00-06:00 02:00-06:00 06:00-08:00 06:00-07:00 07:00 07:00-08:00 08:00 08:00-13:30 08:00-09:30 09:30 09:30-10:00 10:00 10:00-10:15 10:15 10:15-11:00 11:00 Progress Report Well 03-27 Page 2 Rig Nabors 9ES Date 11 April 00 Duration 1-1/2 hr 7-1/2 hr 7-1/2 hr 5-1/2 hr 1 hr 1/2 hr 4 hr 4 hr 2 hr 1 hr 1 hr 5-1/2 hr 1-1/2 hr 1/2 hr 1/4 hr 3/4 hr Activity Installed Hanger plug Pull blanking plug. RU lubricator and pull BPV. Equipment work completed Electric wireline work Conducted electric cable operations RU Schlumberger and wirline lubricator, hold safety meeting, run CCL, tag at 2258' corrected MD, logged up, verified top SSSV, flow coupling 10' pup two joints. Fire string shot across plan cut depth. Chemical cut 5-1/2" tubing at 2237 (in 10' pup top) Completed run with Perforating tools from 2258.0 ft to 2237.0 ft Pull Tubing, 5-1/2in O.D. Pulled Tubing on retrieval string to -8.0 fl Backed out LDDS while POH w/wireline and rigging back Schlumberger. Make up landing joint and pull tubing hanger to the rig floor. Rig down and release Schlumberger. Completed operations Rigged up Handling equipment RU Camco spooling unit. Spool up 150' of bare control line from one of two parted lines. Equipment work completed Laid down Tubing of 1430.0 ft Recovered hanger, space out pups and 35 of 54 joints of 5-1/2" LTC IPC tubing at 06:00. Second control line coming out with tubing. Only top two SS bands recovered. Laid down Tubing of 1430.0 ft Continue to lay down 5-1/2" tubing. Recovered 3 pups + 54 joints + 2.8' cut stub (clean cut). Recovered one complete control line and 150' of the other. Recovered 5 of 23 SS bands. Pull Tubing, 5-1/2in O.D. (cont...) Laid down 2210.0 ft of Tubing (cont...) Continue to lay down 5-1/2" tubing. Recovered 3 pups + 54 joints + 2.8' cut stub (clean cut). Recovered one complete control line and 150' of the other. Recovered 5 of 23 SS bands. 54 joints laid out Rigged down Tubing handling equipment Equipment work completed BHA run no. 1 Made up BHA no. 1 Install wear ring. PU BHA #1 "Crank Case" (wire grab) to recover control line left in hole. BHA no. 1 made up R.I.H. to 686.0 ft PU singles from pipe shed. RIH to 686', rotate 10 turns. At Top of fish: 686.0 ft Pulled out of hole to 369.0 ft At BHA Pulled BHA BHA Stood back MAY '10 200(} Facility Date/Time PB DS 03 11:00-13:30 13:30 13:30-20:30 13:30-14:30 14:30 14:30-15:30 15:30 15:30-18:00 Progress Report Well 03-27 Page 3 Rig Nabors 9ES Date i 1 April 00 18:00 18:00-18:30 18:30 18:30-19:00 19:00 19:00-20:00 20:00 20:00-20:30 20:30 20:30-01:30 20:30-21:00 Duration 2-1/2 hr 7 hr 1 hr 1 hr 2-1/2 hr 1/2 hr 1/2 hr 1 hr 1/2 hr 5 hr 1/2 hr 21:00 21:00-22:00 1 hr 22:00 22:00-23:00 1 hr 23:00 23:00-23:30 1/2 hr 23:30 23:30-00:30 1 hr 27 Mar 00 00:30 00:30-01:30 1 hr 01:30 01:30-06:00 4-1/2 hr 01:30-06:00 4-1/2 hr 01:30-06:00 4-1/2 hr Activity Laid down fish Pull trailing control line OOH in 100' pieces and cut tangled line from the spear. Recovered all control line and 14 more SS bands (four missing total). Lay down spear. Complete fish recovered BHA run no. 2 Serviced Top drive Clear rig floor, service top drive. Equipment work completed Made up BHA no. 2 Washover shoe and washpipe. BHA no. 2 made up R.I.H. to 2257.0 ft 4 stands and 51 singles. At Top of fish: 2237.0 ft Washed over string at 2306.0 ft No indication of SS bands or top of fish. RIH to SSSV lugs at mill same at 2257. Completed operations Circulated at 2306.0 ft Blow down top drive. Obtained bottoms up (100% annulus volume) Pulled out of hole to 369.0 ft At BHA Pulled BHA BHA Stood back BHA run no. 3 Made up BHA no. 3 Outside cutter on washpipe BHA no. 3 made up R.I.H. to 2282.0 ft At Top of fish: 2237.0 ft Fished at 2281.0 ft Cut tubing in 10' pup joint below lower SSSV flow coupling. Fish came free Pulled out of hole to 369.0 ft At BHA Pulled BHA BHA Laid out Laid down fish Lay down 38.5' of fish: two cut tubing ends, SSSV and flow couplings with stuck packer and cut CT. Complete fish recovered Run Casing, 5-1/2in O.D. Ran Casing to 1440.0 ft (5-1/2in OD) Pull wear ring. RIH w/washpipe / overshot on used 5-1/2" 17# L-80 NSCT. 35 of 56joints in at 06:00. Ran Casing to 1440.0 ft (5-1/2in OD) Continue RIH w/5-1/2" temporary tieback string. Work over top of cut tubing at 2281' and land in tubing hanger. 72K lbs PUW. Facility Date/Time 28 Mar 00 PB DS 03 .Progress Report Well 03-27 Page 4 Rig Nabors 9ES Date 11 April 00 06:00-08:00 06:00-08:00 08:00 08:00-21:00 08:00-10:30 10:30 10:30-14:30 14:30 14:30-15:00 15:00 15:00-17:30 17:30 17:30-18:00 18:00 18:00-20:30 20:30 20:30-21:00 21:00 21:00-02:30 21:00-22:00 22:00 22:00-00:30 00:30 00:30-00:45 00:45 00:45-02:30 02:30 02:30-06:00 02:30-03:00 03:00 03:00-05:00 Duration 2 hr 2 hr 13hr 2-1/2 hr 4 hr 1/2 hr 2-1/2 hr 1/2 hr 2-1/2hr 1/2 hr 5-1/2 hr I hr 2-1/2 hr 1/4 hr 1-3/4 hr 3-1/2 hr 1/2 hr 2 hr Activity Run Casing, 5-1/2in O.D. (cont...) Ran Casing to 2303.0 fi (5-1/2in OD) (cont...) Continue RIH w/5-1/2" temporary tieback string. Work over top of cut tubing at 2281' and land in tubing hanger. 72K lbs PU-W. Completed run with Tubing to 2303.0 BHA run no. 4 Made up BHA no. 4 Clear floor area, change handling tools, make-up o'shot BHA 4. BHA no. 4 made up Singled in drill pipe to 2486.0 ft PU 2-3/8" DP from shed. Rig walkthrough with Gunkle / Phillips. At Top of fish: 2486.0 fi Tagged up on fish. Fished at 2486.0 ft Latch fish and pick up 6K lbs over up weight. Fish broke free, gained 1-2K lbs PUW. Fish came free Pulled out of hole to -12.0 ft CT fish at surface. Install dog collar, set slips, secure brake. Stopped: To hold safety meeting Held safety meeting PJSM on tubing cutting procedures and handling safety. Completed operations Laid down fish Cut CT fish into 20' sections. Lay down same. 476.5' of fish recovered. End is flared and split where CT connector to GLM was fixed. Partial fish recovered Serviced Top drive Equipment work completed BHA run no. 5 Made up BHA no. 5 ~: Overshot for CT connector. BHA no. 5 made up R.I.H. to 2963.0 ft ~IAY 'I 0 ~000 Tagged fish w/34 spm on pump. At Top of fish ' 2962.0 ft Fished at 2962.0 fl Pick up, no drag. Aborted attempts to latch Pulled out of hole to 0.0 ft Overshot at surface - no fish. At BHA BHA run no. 6 Made up BHA no. 6 Change grapple in o'shot from 3" to 2-7/8". BHA no. 6 made up R.I.H. to 2962.0 ft Facility Date/Time 29 Mar 00 PB DS 03 Progress Report Well 03-27 Page 5 Rig Nabors 9ES Date 11 April 00 05:00 05:00-05:30 05:30 05:30-06:00 06:00-09:30 06:00-08:00 08:00 08:00-09:30 09:30 09:30-17:00 09:30-10:00 10:00 10:00-12:00 12:00 12:00-14:00 14:00 14:00-15:30 15:30 15:30-17:00 17:00 17:00-20:00 17:00-17:30 17:30 17:30-20:00 20:00 20:00-06:00 20:00-00:30 00:30 00:30-06:00 06:00-07:15 06:00-07:15 07:15 Duration 1/2 hr 1/2 hr 3-1/2 hr 2hr 1-1/2 hr 7-1/2 hr 1/2 hr 2hr 2 hr 1-1/2 hr 1-1/2 hr 3 hr 1/2 hr 2-1/2 hr 10hr 4-1/2 hr 5-1/2 hr 1-1/4 hr 1-1/4 hr Activity At Top of fish: 2962.0 ft Fished at 2962.0 ft Attempt to latch w/same pressure indication of going over the fish, but no extra pick up weight. Pressure falls off after picking up. Aborted attempts to latch Pulled out of hole to 2400.0 ft BHA run no. 6 (cont...) Pulled out of hole to 0.0 ft At Surface '0.0 ft , tAY 10 2000 POOH. No fish. Serviced Block line Line slipped and cut Slip and cut drilline. Adjust drawwork brakes. BHA run no. 7 Made up BHA no. 7 BHA no. 7 made up Make up Spear assembly w/2.375" grapple. R.I.H. to 2962.0 ft At Top of fish: 2962.0 ft RIH w/spear and preapre to latch fish. Fished at 2962.0 ft Fish came free Engage spear and work on coiled tubing fish. Fish moved up 30 ft, continue to work fish. Fish parted @ 83 Klbs o/pull. Pulled out of hole to 50.0 ft Fish at surface POOH to fish. Laid down fish Partial fish recovered LID Coiled Tubing GLM - length of 8.33 ft. BHA run no. 8 Made up BHA no. 8 BHA no. 8 made up M/U overshot assembly w/3" basket grapple. R.I.H. to 2945.0 ft At Top of fish: 2945.0 ft RIH and engage fish @ 2,945'. Slickline wireline work Rigged up sub-surface equipment - Slickline / braided cable Equipment work completed Hold 80 klbs tension in coil fish. Mobilise Slickline and Schlumberger and rig up Slickline equipment. ( Equipment on location @ 1130hfs). Conducted slickline operations on Slickline equipment - Tool run M/U toolstring and RIH w/1.625" drift to 9,708' @ report time- preparing to POOH. Slickline wireline work (cont...) Conducted slickline operations on Slickline equipment - Tool run Completed run with Gauge cutter from 0.0 ft to 9708.0 ft RIH with 1.625" gauge ring and tag connector @ 9,708'. POOH and RID Slickline. Facility Date/Time PB DS 03 Duration 5~3/4 hr 07:15-13:00 1-3/4 hr 07:15-09:00 09:00 09:00-11:30 11:30 1 hr 11:30-12:30 12:30 12:30-13:00 13:00 13:00-16:00 13:00-16:00 16:00 1/2 hr 3 hr 3 hr 7-1/2 hr 7-1/2 hr 16:00-23:30 16:00-23:30 23:30 6-1/2 hr 23:30-06:00 1/2 hr 23:30-00:00 30 Mar 00 00:00 2 hr 00:00-02:00 02:00 Progress Report Well 03-27 Page 6 Rig Nabors 9ES Date 11 April 00 02:00-06:00 06:00-09:00 06:00-09:00 09:00 09:00-20:45 09:00-10:00 10:00 4 hr 3 hr 3 hr 11-3/4 hr 1 hr Activity Electric wireline work Rigged up Lubricator Equipment work completed RFU Schlumberger and hold PJSM on chemical cutter operations. In Radio Silence. Conducted electric cable operations Observed 0.40 klb overpull RIH. Tag connector on depth and fire 1.5625" chemical cutter @ 9,685'. No positive surface indications of cut but when POOH observe overpulls- Temporally stuck @ 8,257'. Free same and POOH to connector @ 5,631' w/400 lbs drag.. Conducted electric cable operations Gas lift mandrel assembly got stuck at 5631.0 ft Unable to work chemical cutter past connector restriction. Unable to go down. Shear rope socket W/ 2800 lbs ( 115% of rope socket yield) Rigged up Logging/braided cable equipment Equipment work completed BHA run no. 8 Worked stuck pipe at 2882.0 ft Aborted attempts to work Coiled tubing tools free at 2897.0 ft Work coil fish. Moved fish up hole 45 ft w/30-45 klbs o/pull. Unable to move any further. Work pipe and circulate down thru fish- when S/O pressure increases indicating chemical cutter fish is restricting flow down coil tubing. Electric wireline work Conducted electric cable operations Completed run with Chemical cutter from 0.0 ft to 5577.0 ft R/U Schlumberger and run 1.5625" chemical cutter correlating to previous runs- make cut at 5,577'- good indication of cut. POOH. R/D Schlumberger. BHA run no. 8 Fished at 5577.0 ft Fish came free P/U- Coil tubing fish free w/PFU weight of 65 klbs. Prepare to POOH. Pulled out of hole to 0.0 ft At BHA POOH w/2.3/8" DP and L/D fishing equipment. Pulled out of hole to 1500.0 ft POOH laying down coiled tubing fish in 20 ft segments. BHA run no. 8 (cont...) Laid down fish Complete fish recovered POOH laying down coil tubing fish in 20 ft lengths. 2,680 ft recovered. Coil in good shape- no corrosion. BHA run no. 9 Made up BHA no. 9 Stopped: To hold safety meeting M/U overshot assembly and jars w/2.3/8" basket grapple. Facility Date/Time PB DS 03 Progress Report ! Well 03-27 Rig Nabors 9ES 10:00-10:30 10:30 10:30-12:30 Duration 1/2 hr 2hr Activity Held safety meeting Completed operations Made up BHA no. 9 i Page 7 Date I1 April00 NtAY 10 200C 12:30 12:30-14:30 14:30 14:30-16:00 16:00 16:00-17:00 17:00 17:00-19:30 19:30 19:30-20:45 20:45 20:45-06:00 20:45-22:30 22:30 22:30-00:30 31 Mar 00 00:30 00:30-01:30 01:30 01:30-04:30 04:30 04:30-05:00 05:00 05:00-06:00 06:00 06:00-12:45 06:00-06:30 06:30 06:30-08:30 08:30 08:30-10:30 10:30 10:30-12:45 12:45 2 hr 1-1/2 hr lhr 2-1/2 hr 1-1/4 hr 9-1/4 hr 1-3/4 hr 2 hr 1 hr 3 hr 1/2 hr 1 hr 6-3/4 hr 1/2 hr 2 hr 2 hr 2-1/4 hr BHA no. 9 made up Mm remainder BHA and pick up 12 x 3~'i78~I0{'~!'!~~''';~'~ ~:. . drillcollars. R.I.H. to 2900.0 ft Stopped: To pick up/lay out tubulars Singled in drill pipe to 5575.0 ft 70 joints picked up Fished at 5575.0 ft Coiled tubing parted with 52.00 klb overpull, 2.00 klb wt loss Wash over fish and latch same. Circulate @ 0.4 BPM/ 1600 psi. Work fish and coil tubing parted w/52 klbs o/pull- suspect @ connector. Good circulation. Pulled out of hole to 400.0 ft At BHA Laid down fish Partial fish recovered Recover 12.35 ft of coil. Tubing parted at connector - OD = 3". BHA run no. 10 Made up BI-IA no. 10 BI-IA no. 10 made up Make up same fishing assembly c/w 1.375" basket grapple for wireline fish. R.I.H. to 5587.0 ft At Top of fish: 5587.0 ft Fished at 5587.0 ft Aborted attempts to latch Break circulation and attempt to lrtach. Tag top of connector on depth- no indications of fish caught. Pulled out of hole to 300.0 ft At BHA Held safety meeting Completed operations Hold to PJSM with Schlumberger to discuss laying down chemical cutter. Laid down fish Began precautionary measures No Fish. Clear rig floor and prepare to pick up next BHA. BHA run no. 11 Made up BHA no. 11 BHA no. 11 made up M/U overshot assembly w/3" spiral grapple. R.I.H. to 5500.0 ft Stopped: To service drilling equipment Serviced Block line Line slipped and cut Slip and cut drilline. Service Top Drive. Fished at 5588.0 ft Latched fish Space-out pup joints and attcmpt to lalch-f~n. Lip Facility PB DS 03 Progress Report Well 03-27 Page 8 Rig Nabors 9ES Date 11 April 00 Date/Time 12:45-16:00 12:45-16:00 16:00 16:00-21:30 16:00-16:30 16:30 16:30-19:30 19:30 19:30-21:30 21:30 21:30-04:30 21:30-04:30 01 Apr00 04:30 04:30-06:00 04:30-06:00 06:00-14:00 06:00-06:30 06:30 06:30-09:00 09:00 09:00-09:30 09:30 09:30-10:30 10:30 10:30-11:30 11:30 11:30-12:30 12:30 12:30-14:00 14:00 Duration 3-1/4 hr 3-1/4 hr 5-1/2 hr 1/2 hr 3hr 2 hr 7 hr 7 hr 1-1/2 hr 1-1/2 hr 8 hr 1/2 hr 2-1/2 hr 1/2 hr 1 hr 1 hr 1 hr 1-1/2 hr Activity guide appaesr to be "rolling" off top of fish. Electric wireline work Conducted electric cable operations Completed run with Drift from 0.0 ft to 9614.0 ft RFLI Schlumberger and Lubricator. RIH w/1.3/8" dummy gun as a drift and tag chemical cutter fish @ 9,614 ft. POOH and R/D Schlumberger. BHA run no. 11 Fished at 5588.0 ft Released fish Pick up on fish- overshot pulled off with 10 klbs o/pull. Aborted any further attempts to latch fish. Pulled out of hole to 300.0 ft At BHA Pulled BHA BHA Laid out Lay down BHA. Clear rigfloor and prepare to handle 5.1/2" tubing. Pull Tubing, 5-1/2in O.D. Laid down 2268.0 ft of Tubing Completed operations MFU landing hoint to hanger and pull to rigfloor. Continue to POOH laying down 5. I/2" tubing f/ tieback string. L/O washpipe and fishingtools. Clear rigfloor- run wear ring and change out top drive subs. BHA run no. 12 Made up BHA no. 12 M/U 8.1/8" overshot fishing assembly w/5.1/2" basket grapple and mill control. BHA run no. 12 (cont...) Made up BHA no. 12 BHA no. 12 made up M/U 8.1/8" overshot assembly w/5.1/2" basket grapple. Singled in drill pipe to 2282.0 ft At Top of fish · 2282.0 ft RIH picking up 64 joints of 4" drillpipe to TOF @ 2,282'. Fished at 12.0 ft Fish came free Up/Down weight @ 80 klbs. Ltach fish and pull free w/270 klbs ( 190 klbs o/pull). Gain 20 klbs weight- probably top 4.1/2" pipe. Circulated at 3632.0 ft Obtained bottoms up (100% annulus volume) CBU @ 5.5 BPM/240 psi. Pulled out of hole to 400.0 ft At BHA Pulled BHA I\i~A¥ 1 0 2001 BHA Stood back Laid down fish .:~.:' .'. '. ~ ~ ...... ',..',, Partial fish recovered ",,~: ' ~ ~'.~: ~.!? R/U and lay down 33 joints of 5.1/2", 17 lb/fi tubing and 1 x GLM. Tubing. had parted at the 4. i/2" p.T ,~r, ....... :~- '~ 5 ' t~,, 4.1 t'~' I'L~'-I'O ~kJllll~,UtJil W . ii.& X Il.& CFOSSOVCI. Facility Date/Time PB DS 03 Duration 14:00-06:00 16 hr 14:00-16:30 2-1/2 hr 16:30 16:30-17:45 1-1/4 hr 17:45 17:45-18:30 3/4 hr 18:30 18:30-20:30 2 hr 20:30 20:30-22:00 1-1/2 hr 22:00 22:00-04:00 6 hr 02 Apr 00 04:00 Progress Report 04:00-05:00 1 hr 05:00 Well 03-27 Page 9 Rig Nabors 9ES Date 11 April 00 05:00-06:00 1 hr . Activity 05:00-06:00 1 hr 06:00-20:30 14-1/2 hr 06:00-16:00 10 hr 16:00 16:00-20:30 4-1/2 hr 20:30 20:30-01:00 4-1/2 hr 20:30-01:00 4-1/2 hr BHA run no. 13 Made up BHA no. 13 BHA no. 13 made up MFLI same overshot w/4.1/2" basket grapple and remainder BHA. Singled in drill pipe to 3637.0 ft At Top of fish' 3637.0 ft Single in drillpipe to TOF. Fished at 3637.0 ft Fish came free Up/Down weight = 100 klbs. Engage fish and pull free w/275 klbs ( 175 klbs o/pull). Gain 45 klbs weight ( down in 3.1/2" tubing?), pull up and "engage" CT GLM. Pull free w/90 klbs o/pull. Gain a further 15 klbs- complete coil fish?. Pulled out of hole to 300.0 ft At BHA Pulled BHA BHA Laid out Pull BHA and release overshot. Prepare to pull 4.1/2" Tubing. Laid down fish Stopped ' To change handling equipment POOH and lay down 67 joints of 4.1/2", FL4S, 12.6 lb/ft tubing. Pins badly corroded. Rigged up Handling equipment Equipment work completed Cut 3.1/2" Tubing and secure Coil Fish. L/O Crossover and Coil GLM. R/U c-plate on top of 3.1/2" joint and coil tubing handling equipment. Laid down fish PJSM.Commence laying down Coil Tubing fish in 19 ft lengths. Laid down fish POOH with 2-3/8" coil tubing fish (through 4-1/2" x 3-1/2" tubing fish). Cutting coil in 19' lengths. BHA run no. 13 (cont...) Laid down fish (cont...) POOH with 2-3/8" coil tubing fish (through 4-1/2" x 3-1/2" tubing fish). Cutting coil in 19' lengths. Partial fish recovered Complete recovery of 2-3/8" coil tubing fish. Laid down fish Clear rig floor of coil tubing handling tools and POOH LD 4-1/2" x 3-1/2" tubing. Recovered all of 4-1/2" tubing and 3 jts + one pup of 3-1/2" tubing leaving 3-1/2" GLM looking up. New TOF -- 7,592' MD. Partial fish recovered Test well control equipment Tested BOP stack Pull wear ring, set test plug, change out top rams and test BOPE to 250 psi Iow and 3,500 psi high. Facility PB DS 03 Date/Time 03 Apr00 01:00 01:00-06:00 01:00-06:00 Duration 5 hr 5hr 01:00-06:00 5 hr 06:00-08:00 2 hr 06:00-08:00 2 hr 08:00 08:00-16:00 8 hr 08:00-16:00 8 hr 16:00 16:00-06:00 14 hr 16:00-20:30 4-1/2 hr 1 hr Progress Report Well 03-27 Page 10 Rig Nabors 9ES Date 11 April 00 20:30 20:30-21:30 21:30 21:30-23:00 1-1/2 hr 23:00 23:00-03:30 4-1/2 hr 04 Apr 00 03:30 03:30-06:00 2-1/2 hr 03:30-06:00 2-1/2 hr Activity Pressure test completed successfully - 3500.000 psi Electric wireline work Conducted electric cable operations POOH with fired 2-3/8" chemical cutter. RD Schlumberger. Conducted electric cable operations RU Schlumberger e-line. MU chemical cutter for 3-1/2" tubing and RIH (went right into top of fish at -7,592' MD). Correlate and fire cutter at 9,680' ELM (middle of bottom full joint above packer). POOH with e-line tools at report time. Electric wireline work (cont...) Conducted electric cable operations (cont...) RU Schlumberger e-line. MU chemical cutter for 3-1/2" tubing and RIH (went right into top of fish at -7,592' MD). Correlate and fire cutter at 9,680' ELM (middle of bottom full joint above packer). POOH with e-line tools at report time. Completed run with Chemical cutter from 9680.0 ft to 0.0 ft Derrick management Laid out 2-3/8in drill pipe from derrick Rid handling equipment. RIH with 59 stands 2-3/8" DP and POOH laying down same. RD handling tools. Clear rig floor. 177 joints laid out BHA run no. 15 R.I.H. to 7590.0 ft MU Baker fishing assembly and single in hole on 4" DP. Engage top of fish at 7,590' MD. Observed loss of 10.00 klb string weight At top of 3-1/2" tubing fish. Fished at 7590.0 ft Engage fish and work pipe. No apparent chemical cut and jars not firing. Continue working pipe until free. Appearance of seal assembly pulling free from packer. Fish came free Circulated at 9705.0 ft Circulate bottoms up (5 bpm @ 430 psi). Monitor for gas - none. Obtained bottoms up (100% annulus volume) Pulled out of hole to 9705.0 fl POOH with 3-1/2" tubing fish (5-10k drag first 1,200' off bottom). Fish at surface Laid down fish Continue POOH and LD 3-1/2" tubing fish. Recovered 4 GLM's, 51 joints and 22' parted joint of 3-I/2" tubing. New top of fish at -9,002' MD. Laid down fish RU handling tools and LD 3-1/2" tubing fish. Recovered top 4 GLM's and 42its of 3-1/2" tubing as of report time. Top gas lift mandrel has fresh ........... ~-- -:~' .......... by ..... j k?) Facility Date/Time PB DS 03 06:00-07:00 06:00-06:30 Progress Report Well 03-27 Page 11 Rig Nabors 9ES Date 11 April 00 06:30 06:30-07:00 07:00 07:00-21:30 07:00-08:00 08:00 08:00-09:30 09:30 09:30-10:30 10:30 10:30-13:30 13:30 13:30-15:30 15:30 15:30-16:30 16:30 16:30-20:30 20:30 20:30-21:30 21:30 21:30-06:00 21:30-22:30 22:30 22:30-02:30 05 Apr 00 02:30 02:30-03:30 Duration lhr 1/2 hr 1/2 hr 14-1/2 hr 1 hr 1-1/2 hr 1 hr 3 hr 2 hr 1 hr 4 hr 1 hr 8-1/2 hr 1 hr 4 hr 1 hr Activity BHA run no. 15 (cont...) Laid down fish (cont...) RU handling tools and LD 3-1/2" tubing fish. Recovered top 4 GLM's and 42 jts of 3-1/2" tubing as of report time. Top gas lift mandrel has fresh gash down the side (pulled by hard junk?). Partial fish recovered Pulled BHA Change out fishing jars and LD overshot. BHA Stood back BHA run no. 16 Made up BHA no. 16 Redress overshot with new 3-1/2" grapple and extension. PU new fishing jars. BHA no. 16 made up R.I.H. to 3605.0 ft RIH to 3,605' MD. Stopped · To service drilling equipment Serviced Block line Slip and cut 78' of drilling line. Line slipped and cut R.I.H. to 9002.0 ft RIH to 9,002' MD (top of fish). Singled in last -1,410'. At Top of fish ' 9002.0 ft Fished at 9002.0 ft Engage and latch fish at 9,002' MD. Attempted to circulate and pressured up to 400 psi in 15 strokes (no holes in tubing). Bleed pressure and jar up 80-90k over PUW for 60 minutes. Fish came free or parted. Gained 7-8k string weight. Fish came free Circulated at 9002.0 ft Circulate bottoms up (5-1/2 bpm @ 615 psi) and monitor for gas - none. Obtained bottoms up (100% annulus volume) Pulled out of hole to 0.0 ft POOH with 3-1/2" tubing fish. Recovered 8 full joints and one pup joint (267.69'), leaving GLM #7 looking up. Fish at surface Pulled BHA LD overshot. Inspect top drive (after jarring). BHA Stood back BHA run no. 17 Made up BHA no. 17 MU new overshot and PU fishing BHA #17. BHA no. 17 made up R.I.H. to 9266.0 ft RIH to top of fish. Break circulation. Establish PU, SO weights. At Top of fish ' 9266.0 ft Fished at 9266.0 ft .............. ":~'- ....... pip ~--' ' ":"~' "~- . ~;~ 'Z~ '~. ,..; ~ %.. · Facility Date/Time PB DS 03 Progress Report Well 03-27 Page 12 Rig Nabors 9ES Date 11 April 00 03:30 03:30-05:00 05:00 05:00-06:00 05:00-06:00 06:00-11:30 06:00-09:30 09:30 09:30-10:30 10:30 10:30-11:30 11:30 11:30-06:00 11:30-12:30 12:30 12:30-17:00 17:00 17:00-19:30 19:30 19:30-22:00 22:00 22:00-23:30 23:30 23:30-01:00 Duration 1-1/2 hr 1 hr 1 hr 5-1/2 hr 3-1/2 hr 1 hr 1 hr 18-1/2 hr 1 hr 4-1/2 hr 2-1/2 hr 2-1/2 hr 1-1/2 hr 1-1/2 hr Activity 45 minutes. Fish free or parted. Fish came free Circulated at 9266.0 ft Circulate bottoms up (5-1/2 bpm @ 750 psi). Trace of gas on bottoms up. Monitor well - OK. Obtained bottoms up (100% annulus volume) Pulled out of hole to 8500.0 ft POOH with 3-1/2" tubing fish. Intermittent drag 5-15k throughout 7" liner. Pulled out of hole to 8500.0 ft POOH with 3-1/2" tubing fish. Estimate 2-4k over string weight. 10 stands off bottom at report time. BHA run no. 17 (cont...) Pulled out of hole to 0.0 ft (cont...) POOH with 3-1/2" tubing fish. Estimate 2-4k over string weight. 10 stands off bottom at report time. Fish at surface Laid down fish Lay down 3-1/2" tubing fish. Recovered GLM #7 and 5 joints 3-1/2" tubing. New top of fish = 9,438' MD (3-1/2" tubing collar looking up). Partial fish recovered Pulled BHA Lay down fishing BHA. BHA Stood back BHA run no. 18 Made up BHA no. 18 Make up fishing BHA. PU new overshot guide and basket grapple. BHA no. 18 made up R.I.H. to 9438.0 ft RIH with fishing BH/~. Tagged up -20' high on junk. Wash and rotate down to top of fish. Engage and latch fish. At Top of fish · 9834.0 ft Rigged up Lubricator RU Schlumberger e-line. RU side entry sub, swivel, lubricator, pump in sub and TIW. Work completed - Lubricator in position Functioned downhole tools at 9438.0 ft RIH with free point. Establish free pipe to 9,480' MD. Attempt to RIH to GLM #8. Tagged up at 9,530' MD inside 3-1/2" tubing fish. Attempted to SO, PU, pump and jar to get tools down without success. Aborted equipment work Rigged down Lubricator POOH with Schlumberger e-line. RD lubricator hook-up. Work completed, equipment laid out Fished at 9438.0 ft Jar on fish and work pipe. No movement, no progress. Could not part, so made blind backoff. Intermittent drag up, but could be junk along side · -//o,, ...... L.~. C' ...... , !~ .... _~.~ ' ' ...L" Facility PB DS 03 Progress Report Well 03-27 Page 13 Rig Nabors 9ES Date 11 April 00 Date/Time 06 Apr 00 01:00 01:00-04:00 04:00 04:00-06:00 04:00-06:00 06:00-13:30 06:00-12:30 12:30 12:30-13:30 13:30 13:30-14:00 13:30-14:00 14:00 14:00-21:00 14:00-15:30 15:30 15:30-19:00 19:00 19:00-21:00 21:00 21:00-01:30 21:00~01:30 07 Apr 00 01:30 01:30-06:00 01:30-03:30 03:30 03:30-04:30 04:30 04:30-05:30 Duration 3hr 2 hr 2 hr 7-1/2 hr 6-1/2 hr 1 hr 1/2 hr 1/2 hr 7 hr 1-1/2 hr 3-1/2 hr 2 hr 4-1/2 hr 4-1/2 hr 4-1/2 hr 2 hr 1 hr 1 hr Activity Released fish Circulated at 9438.0 fl Circulate bottoms up. Monitor for gas - none. Circulate wellbore to clean seawater. Hole displaced with Seawater - 100.00 % displaced Pulled out of hole to 7800.0 ft POOH LD drillpipe. Pulled out of hole to 7800.0 ft POOH laying down 4" drillpipe. -50 joints out of hole at report time. BHA run no. 18 (cont...) Pulled out of hole to 275.0 ft (cont...) POOH laying down 4" drillpipe. -50 joints out of hole at report time. At BHA Pulled BHA Pull BHA laying down DC's. LD overshot. One 3-1/2" tubing collar (6 inches) recovered in overshot. Significant scarring on outside body of 5-7/8" overshot (junk damage). BHA Laid out Wellhead work Retrieved Wear bushing Pull wear bushing. Equipment work completed Run Tubing, 5-1/2in O.D. Rigged up Tubing handling equipment RU tubing handling equipment. Clear and clean rig floor while loading tubing into pipe shed. Equipment work completed Ran Tubing to 3254.0 ft (5-1/2in OD) Run 5-1/2" x 4-1/2" tubing (circulation/kill string) to 3,254' MD. At Setting depth ' 3254.0 fl Rigged up Tubing hanger MU tubing hanger, install BPV and land tubing. PU weight = 86k. RILDS. Pressure test below BPV to 500 psi - OK. Work completed - Tubing hanger in position Nipple down All rams Rigged down All rams Swap out (rental) 3-1/2" x 6" VBR's to 2-7/8" x 5-1/2" VBR's. ND BOPE. Equipment work completed Wellhead work Installed Xmas tree NU adapter flange and tree. Test seals to 5,000 psi - OK. Equipment work completed Retrieved Hanger plug RU DSM. Pull BPV. RD DSM. Equipment work completed Tested Xmas tree Facility PB DS 03 Progress Report Well 03-27 Page 14 Rig Nabors 9ES Date 11 April 00 Date/Time 05:30 06:00-06:00 06:00-07:00 07:00 07:00-09:00 09:00 09:00-09:30 09:30 09:30-11:00 11:00 Duration 24 hr lhr 2 hr 1/2 hr 1-1/2 hr Activity 5,000 psi - OK. Remove tree test plug. Pressure test completed successfully - 5000.000 psi Wellhead work (cont...) Rigged up High pressure lines RU HB&R to freeze protect wellbore. Equipment work completed Circulated at 3254.0 ft Test lines to 3,000 psi - OK. Freeze protect wellbore to 2,200' MD (pump 150 bbls down annulus and allow to u-tube). String displaced with Diesel - 67.00 % displaced Installed Hanger plug Install BPV and test from below to 500 psi with HB&R - OK. Equipment work completed Rigged down High pressure lines RD HB&R and high pressure lines to tree. Remove second annulus valve. Secure tree and clean cellar. Rig released for exception move to PM-2 at 1100 hfs on 4/7/00. Equipment work completed Rig released from 3-27 RWO. Facility ! PB DS 03 Progress Report Well 03-27 Page 1 Rig Nabors 4ES Date 01 May 00 Date/Time 12 Apr 00 13 Apr 00 14 Apr O0 12:00-22:00 12:00-22:00 22:00 22:00-06:00 22:00-06:00 06:00 06:00-12:00 06:00-12:00 12:00 12:00-18:00 12:00-18:00 18:00 18:00-21:30 18:00-20:00 20:00 20:00-21:30 21:30 21:30-01:00 21:30-01:00 01:00 01:00-04:30 01:00-04:30 04:30 04:30-05:30 04:30-05:30 05:30 05:30-06:00 05:30-06:00 06:00 06:00-07:30 06:00-07:30 07:30 07:30-08:30 07:30-08:30 08:30 08:30-12:30 08:30-12:30 12:30 12:30-16:00 Duration 10hr 10 hr 8hr 8hr 6hr 6hr 6hr 6hr 3-1/2 hr 2hr 1-1/2 hr 3-1/2 hr 3-1/2 hr 3-1/2 hr 3-1/2 hr 1-1/2 hr 1-1/2 hr lhr 1 hr 4 hr 4hr 3-1/2 hr Activity Move rig Rig moved 100.00 % At well location - Slot Derrick management Serviced Block line Change out blocks & string new line. Stopped: To hold safety meeting crew change. Derrick management (cont...) Serviced Block line confine with the changing out & stringing new ddg. line (Had a Few Problems) Equipment work completed Derrick management Installed Drillstring handling equipment load pipe shed with 300 jts. 3.5" drill pipe & take on sea water & rig lines to tiger tank to displace freeze protection. Equipment work completed Wellhead work Retrieved Hanger plug rig lubricator & pull bpv & re-install twc. Equipment work completed Removed Xmas tree Equipment work completed Nipple up BOP stack Installed BOP stack Equipment work completed Test well control equipment Tested BOP stack had a failure in the upper kellly valve. Pressure test completed successfully - 3500.000 psi Wellhead work Removed Hanger plug Equipment work completed Fluid system Circulated at 3300.0 ft prepare & begin to circulate freeze protection from well. Stopped: To hold safety meeting Wellhead work Removed Tubing hanger bolds & pull hanger to floor & lay dn same. Equipment work completed Fluid system Circulated at 3300.0 ft displace diesel from well bore with sea h20 Hole displaced with Seawater - 100.00 % displaced Wellhead work Serviced Seal assembly Make up baker 9-5/8" pkr. & set at 30' -+ & change out 9-5/8" packoff & retrieve pkr. & lay dn same. Equipment work completed Pull Tubing, 5-1/2in O.D. Facility PB DS 03 Progress Report Well 03-27 Page 2 Rig Nabors4ES Date 01 May00 Date/Time 15 Apr 00 12:30-16:00 16:00 16:00-17:00 16:00-17:00 17:00 17:00-18:00 17:00-18:00 18:00 18:00-06:00 18:00-21:00 21:00 21:00-23:30 23:30 23:30-01:00 01:00 01:00-06:00 06:00 06:00-06:00 06:00-11:00 11:00 11:00-13:00 13:00 13:00-14:00 14:00 14:00-14:30 14:30 14:30-15:30 15:30 15:30-17:00 17:00 17:00-18:00 18:00 18:00-20:30 20:30 20:30-21:30 Duration 3-1/2 hr lhr lhr lhr lhr 12hr 3hr 24 hr 5hr 2hr lhr 1/2 hr lhr 1-1/2 hr lhr 2-1/2 hr lhr Activity Laid down 3300.0 ft of Tubing pooh laying dn kill string. Completed operations Derrick management Rigged up Drillstring handling equipment Equipment work completed Wellhead work Installed Wear bushing Equipment work completed 3-1/2in. Drillpipe workstring run Installed Other sub-surface equipment Make up FTA # 1 Shoe +9-jts. wash pipe + washover basket+bumper sub+jars+9-dc. =583.75 ' Equipment work completed Singled in drill pipe to 1200.0 ft Stopped: To service drilling equipment Installed Kelly cocks Equipment work completed Singled in drill pipe to 5500.0 ft Stopped: To hold safety meeting 3-1/2in. Drillpipe workstring run (cont...) Singled in drill pipe to 9409.0 ft At Top of fish: 9409.0 ft Washed to 9476.0 ft Wash over Tbg. From 9433' To 9476' Stopped: To circulate Circulated at 9476.0 ft Circ. & sampple of returns showed cmt. (determined by applying Phenolphthalen ) Obtained clean returns - 100.00 % hole volume Washed to 9539.0 ft wash over( 9476' to 9508'-Hard) (9508' to 9539' easy) Stopped: To circulate Reverse circulated at 9539.0 ft circ. hole clean & send sample of returns to Geologist at Nordic No. 1 To be analyzed > Description:cmt gry-br 2% Cmt-Red/Org=46% Cmt. Wh/gr=45% Csg. Scale=5% wh,/blue/red paint chips=2% +tr lcm fiber, tr metal. No. formation. Obtained clean returns - 100.00 % hole volume Washed to 9569.0 ft wash over from 9539' to 9569' Torq. beginning to get excessive, down hole. Stopped: To circulate Circulated at 9569.0 ft circ. dn drillpipe a solution of lube tex. Obtained clean returns - 100.00 % hole volume Washed to 9590.0 ft rotate & wash from 9569' to 9590' unable to make forward progress. Observed 0.00 klb resistance Circulated at 9590.0 ft Facility PB DS 03 Progress Report Well 03-27 Page 3 Rig Nabors 4ES Date 01 May 00 Date/Time 21:30 21:30-03:30 16 Apr 00 03:30 03:30-06:00 06:00 06:00-17:00 06:00-11:00 11:00 11:00-11:30 11:30 11:30-17:00 17:00 17:00-06:00 17:00-19:30 19:30 19:30-23:30 23:30 23:30-01:00 17 Apr 00 01:00 01:00-06:00 06:00 06:00-08:00 06:00-08:00 08:00 08:00-00:00 08:00-09:00 09:00 09:00-13:00 13:00 13:00-18:00 18:00 18:00-19:00 19:00 19:00-23:00 Duration 6hr 2-1/2 hr llhr 5hr 112 hr 5-1/2 hr 13 hr 2-1/2 hr 4hr 1-1/2 hr 5hr 2hr 2hr 16 hr lhr 4 hr lhr 4hr Activity Obtained clean returns - 100.00 % hole volume Pulled Drillpipe in stands to 583.8 fl Stopped: To pick up/lay out tubulars Rigged down sub-surface equipment - Other sub-surface equipment lay dn wash pipe & Recovered a piece of tbg. in washover basket, app. 2.5' long x 3 "wide angular in shape. Work completed, equipment laid out 3-l/2in. Drillpipe workstring run Ran Drillpipe in stands to 9433.0 ft FTA # 2 Guide+OS bowl+Top Sub+Bumper sub+Jars+9-dc+accl, jars+pump out sub & rih to 9433' On bottom Worked stuck pipe at 9433.0 ft latch overshot & pull 45 k over pulled into. Began precautionary measures Pulled Drillpipe in stands to 0.0 ft Pooh & lay dn 22' of recovered 3.5" tbg. tbg. was sliced badly with washover shoe. Fish at surface 3-1/2in. Drillpipe workstring run Serviced Other sub-surface equipment Make up FTA # 3 Shoe+T-Dog overshot+4-jts. washpipe+washover boot basket+bumper sub+j ars+9-dc+accl. jarS. Equipment work completed Ran Drillpipe in stands to 9455.0 ft On bottom Washed to 9580.0 ft tag top tbg. @ 9455' & wash & slide over to 9580' & jar to 210 K with pu wt of 125 k & had a reduction in wt as if tbg. parted. No further resistance Pulled Drillpipe in stands to 438.0 ft Stopped: To hold safety meeting 3-l/2in. Drillpipe workstring run (cont...) Laid down 438.0 ft of Tubing Recovered 117' tubing fish, Lay Down wash pipe Completed operations BHA run no. 4 Made up BHA no. 4 Shoe+5jts washpipe+boot basket+bumper sub+jars+9DC' s=454.60' BHA no. 4 made up R.I.H. to 9590.0 ft On bottom Washed to 9600.0 ft wash with shoe for 2 hours at 9590 before making forward progress. Pipe free and wash to 9600' at top of GLM. Stopped: To circulate Reverse circulated at 9600.0 ft Obtained clean returns - 150.00 % hole volume Pulled out of hole to 438.0 ft Facility PB DS 03 DatedT~e 23:00 23:00-00:00 18 Apr 00 00:00 00:00-06:00 00:00-01:00 Progress Report Well 03-27 Page 4 Rig Nabors 4ES Date 01 May 00 Duration 1hr 6hr lhr 3hr lhr lhr 5hr 4hr lhr 9-1/2 hr 3-1/2 hr lhr 4hr lhr 01:00 01:00-04:00 04:00 04:00-05:00 05:00 05:00-06:00 06:00 06:00-11:00 06:00-10:00 10:00 10:00-11:00 11:00 11:00-20:30 11:00-14:30 14:30 14:30-15:30 15:30 15:30-19:30 19:30 19:30-20:30 20:30 19 Apr 00 20:30 20:30-21:00 21:00 21:00-00:30 00:30 00:30-00:45 00:45 00:45-02:00 02:00 02:00-06:00 06:00 06:00-08:30 06:00-07:30 07:30 07:30-08:30 08:30 3-1/2 hr 1/4 hr 1-1/4 hr 4 hr 2-1/2 hr 1-1/2 hr 1 hr Activity AtBHA Pulled BHA BI-IA Laid out BI-IA run no. 5 Made up BHA no. 5 Guide,overshot bowl,ext, top sub, bumper jars, oil jars, 9 dc's accel jars BI-IA no. 5 made up R.I.H. to 9572.0 ft On bottom Fished at 9572.0 ft swallow fish no increase in pressure or weight Latched fish Pulled out of hole to 8642.0 ft Stopped: To hold safety meeting BHA mn no. 5 (cont...) Pulled out of hole to 0.0 ft At BHA i.'.'%; ...... ~-:~,. ~.-' ~, .--, ..... Laid down fish Partial fish recovered recovered 18.75" tubing stub ~/~¥ '~ 0 2000 BHA run no. 6 R.I.H. to 9592.0 ft At Top of fish' 9592.0 ft Fished at 9592.0 ft Fish came free Circulate over and latch fish Pulled out of hole to 0.0 ft At BHA Laid down fish Partial fish recovered recovered 35.8' 3-1/2 and GLM pup. GLM box parted BHA run no. 7 Made up BHA no. 7 redress over shot BHA no. 7 made up R.I.H. to 9628.0 ft At Top of fish: 9628.0 ft Fished at 9628.0 ft break circulation, latch fish,Jar 200k Fish came free Circulated at 9628.0 ft Obtained bottoms up (100% annulus volume) Pulled out of hole to 314.0 ft drag 5-15 K over At BHA BHA run no. 7 (cont...) Pulled BHA BHA Stood back Laid down fish Lay down GLM and 58.72 tubing fish Complete fish recovered Facility Date/Time 20 Apr 00 21 Apr 00 Progress Report PB DS 03 Well 03-27 Page 5 Rig Nabors 4ES Date 01 May 00 08:30-00:00 08:30-09:30 09:30 09:30-13:00 13:00 13:00-14:00 14:00 14:00-14:30 14:30 14:30-16:30 16:30 16:30-21:00 21:00 21:00-00:00 00:00 00:00 00:00-01:00 01:00 01:00-03:30 03:30 03:30-05:00 05:00 05:00 06:00-14:30 06:00-09:30 09:30 09:30-10:00 10:00 10:00-14:30 14:30 14:30-01:00 14:30-15:30 15:30 15:30-19:00 19:00 19:00-19:30 19:30 19:30-00:00 00:00 00:00-01:00 01:00 01:00-03:30 Duration 15-1/2 hr lhr 3-1/2 hr lhr 112 hr 2hr 4-1/2 hr 3hr lhr 2-1/2 hr 1-1/2 hr 8-1/2 hr 3-1/2 hr 1/2 hr 4-1/2 hr 10-1/2 hr lhr 3-1/2 hr 1/2 hr 4-1/2 hr lhr 2-1/2 hr Activity BHA run no. 8 Made up BHA no. 8 BI-IA no. 8 made up R.I.H. to 9639.0 ft At Top of fill: 9639.0 ft Washed to 9687.0 ft Wash ot 9687 At Top of fish: 9687.0 ft Latch fish ( tubing stub and seal assembly) Circulated at 9687.0 ft Drop ball to shear sub and shear at 2200 psi Note fish plug with junk Broke circulation Circulated at 9687.0 ft Circulate bottoms up no gas in returns Obtained bottoms up (100% annulus volume) Pulled out of hole to 317.0 ft AtBHA Laid down fish PJSM held with rig crew, fisherman, Schlumberger regarding risk associated with laying down chemical cutter fish from inside the seal asembly. Complete fish recovered BHA run no. 9 Made up BI-IA no. 9 BHA no. 9 made up R.I.H. to 9712.0 ft At Top of fill: 9712.0 ft Milled Hydraulic packer at 9712.0 ft No further resistance Circulated at 9712.0 ft circulat out gas from under milled packer BHA run no. 9 (cont...) Circulated at 9712.0 ft (cont...) circulat out gas from under milled packer String displaced with Seawater - 200.00 % displaced R.I.H. to 10218.0 ft Chase packer to 10218 Stopped: To circulate Pulled out of hole to 0.0 ft At Surface: 0.0 ft BHA run no. 10 Made up BHA no. 10 BHA no. 10 made up R.I.H. to 10220.0 ft At Top of fish: 10220.0 ft Latch fish 152k dn 130K up Fished at 10220.0 ft Fish came free Pulled out of hole to 398.0 ft At BHA Laid down fish Complete fish recovered Test well control equipment Facility PB DS 03 Progress Report Well 03-27 Page 6 Rig Nabors 4ES Date 01 May 00 Date/Time 22 Apr 00 23 Apr 00 01:00-03:30 03:30 03:30 03:30-05:00 05:00 05:00 06:00-18:00 06:00-09:00 09:00 09:00-10:00 10:00 10:00-13:00 13:00 13:00-18:00 18:00 18:00 18:00-22:30 22:30 22:30-23:30 23:30 23:30 06:00-07:30 06:00-07:30 07:30 07:30-17:00 07:30-11:00 11:00 11:00-17:00 17:00 17:00 17:00-03:30 03:30 Duration 2-1/2 hr 1-1/2 hr 12hr 3hr lhr 3hr 5hr 4-1/2 hr lhr 1-1/2 hr 1-1/2 hr 9-1/2 hr 3-1/2 hr 6hr 10-1/2 hr Activity Tested BOP stack Test blinds,pipe rams, HCR's, Choke manifold, floor and dart valve 250/3500 psi, test annular 250/2500 psi, test Kooney, test plug. AOGCC's John Spaulding waived witnessing the BOP test. Function test completed satisfactorily BHA run no. 11 Made up BI-IA no. 11 Mill and casing scraper BHA no. 11 made up R.I.H. to 1500.0 ft Tag fill BHA run no. 11 (cont...) R.I.H. to 10312.0 fi (cont...) Tag fill At Top of fill' 10312.0 ft Washed to 10357.0 ft At Top of cement · 10357.0 ft Circulated at 10357.0 ft Hole swept with slug - 150.00 % hole volume Pulled out of hole to 0.0 ft Recovered two gallons of metal cuttings. At Surface: 0.0 ft BHA run no. 12 R.I.H. to 10100.0 ft Ran RTFS test packer to 10100 123K down 145 K up Stopped: To pressure test Tested Other sub-surface equipment - Via annulus tested 9-5~8 casing liner lap and 7" tieback to3000 psi for 15 minutes OK Function test completed satisfactorily Pulled out of hole to 1500.0 ft Lay down RTrS and install wear ring BHA run no. 12 (cont...) Pulled out of hole to 0.0 ft (cont...) Lay down RTTS and install wear ring At Surface: 0.0 ft Run Other completion type completion, 4-1/2in O.D. Conduct braided cable operations - 5/16 size cable complete misrun with isolation packer to 4220 Completed misrun with Permanent packer to 4220.0 ft Conduct braided cable operations - 5/16 size cable install centrilizers on isolation packer tailpipe and on running tool After four attempts to get past sticky spot only mad 20'. to 4242. POH and install wear ring. Completed misrun with Permanent packer to 4242.0 ft four attempt to get past sticky spot only made 20' POH pull wear ring 3-1/2in. Drillpipe workstring run Singled in drill pipe to 10320.0 ft RIH with isolation packer tailpipe assembly At Setting depth: 10320.0 fl Facility PB DS 03 Date/Time 03:30-03:45 03:45 03:45 03:45 06:00-16:00 06:00-07:00 07:00 07:00-08:00 24 Apr 00 08:00 08:00-15:00 15:00 15:00-16:00 16:00 16:00 16:00-19:30 19:30 19:30 06:00-19:30 06:00-07:00 07:00 07:00-16:30 16:30 16:30-19:00 19:00 19:00-19:30 19:30 19:30-21:00 19:30-21:00 21:00 21:00-23:30 21:00-23:30 23:30 23:30-02:45 23:30-00:30 25 Apr 00 00:30 00:30-02:45 02:45 Progress Report Well 03-27 Page 7 Rig Nabors 4ES Date 01 May 00 Duration 1/4 hr 10hr lhr lhr 7hr lhr 3-1/2 hr 13-1/2 hr lhr 9-1/2 hr 2-1/2 hr 1/2 hr 1-1/2 hr 1-1/2 hr 2-1/2 hr 2-1/2 hr 3-1/4 hr lhr 2-1/4 hr Activity Circulated at 10320.0 ft Broke circulation clear DP volume Conduct braided cable operations - 5/16 size cable POH with CCL/GR Conduct braided cable operations - 5/16 size cable RIH to log packer into position 3-l/2in. Drillpipe workstring run (cont...) Conduct braided cable operations - 5/16 size cable (cont...) RIH to log packer into position Completed run with Permanent packer to 10320.0 ft Set packer at 10320.0 ft with 2500.0 psi Set pacjer with 2500 psi PU 5K over string wt of 140K to complete setting packer Packer set at 10320.0 ft Laid down 10320.0 ft of 3-1/2in OD drill pipe At Surface: 0.0 ft Removed Bore protector Stopped: To change handling equipment Run Single completion, 4-1/2in O.D. Rigged up Tubing handling equipment Equipment work completed Ran Tubing to 4-1/2in (6500.0 ft OD) Run Single completion, 4-1/2in O.D. (cont...) Ran Tubing to 6500.0 ft (4-1/2in OD) (cont...) On bottom Ran Tubing to 9997.0 ft (5-l/2in OD) XO to 5.5 "tubing Hanger landed Reverse circulated at 9997.0 ft Revers in inhibited brine. String displaced with Brine - 100.00 % displaced Tested BOP test plug assembly Set BPV (FMC) Test 300 psi by bullheading annulus Function test completed satisfactorily Nipple down BOP stack Rigged down BOP stack Equipment work completed Test well control equipment Tested All tree production valves Nu tree Pull PBV Set FMC Test plug. Test Tree to 5000 psi. Pull test plug. Drop Ball and ron Function test completed satisfactorily Perform integrity test Tested Permanent packer Set packer with 3500 psi. for 30 min. Bleed of the tubing pressure to 2500 psi. Test annulus to 3000 psi for 30 minutes. Bleed of tubing pressure and shear RB valve in top GLM. Function test completed satisfactorily Circulated at 3900.0 ft Reverse in diesel freeze protection into annulus. "U" tube diesel to tubing String displaced with Diesel - 100.00 % displaced Facility PB DS 03 Progress Report Well 03-27 Rig Nabors 4ES Page 8 Date 01 May 130 Date/Time 02:45 02:45-06:00 06:00 Duration 3-1/4 hr Activity Derrick management Rigged down Drillfloor / Derrick Equipment work completed ~^v 10 200(1 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9443 Company: 5/3/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 3-27 ~-~I,,."i'." TBG. PACKER RECORD 041295 I 1 D.S. 4-12 '~- I~[ TBG. PUNCHER RECORD 032695 I 1 D.S. 4-37 Ut° {p~ PERF. RECORD 041495 I 1 O.S. 6-17 --- ~,-c~O PERF. RECORD 041595 I 1 D.S. 9-25-- ~[~" ~,.~ 'INJECTION PROFILE 041095 I 1 D.S. 14-3 --'~[-~? II EAKDETECTION 041095 I 1 D.S. 16-2 --" ~0- lEO PERF. RECORD 041 195 1 1 D.S. 16-3 "- ~ I" ! ! PERF. RECORD 041 095 I 1 D.S. 16-14 "- ~ I -...~ ;2.. L.BRIDGE PLUG RECORD 041395 I 1 D.S. 18-15 - ~7'~ ;~ CHEMlCALCU'I-rER _ 041395 I 1 D.S. 2-24 951 54 CNT-D 040695 ~.[ 1 D.S. 18-02A 951 59 PDC 041 895 x~ 1 D.S. 15-17 951 55 CNT-G 040595 x'~ I SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. RECEIVED DATE: HAY 0 ¢ i995 Alaska 011 & Gas Cons. Commission Anchorage GeoQuest /~500W. lnternational Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie RECEIVED JA i 2 1995 ~ 0il &AnchomgoGas Cons. Commission NO. 9211 Company: 1/23/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Well Job # Log Description BL RR Sepia RF Sepia Mylar D.S. 1-3 POGLM SETTING RECORD (12-23-94) ~1 -/1 D.S. 1-3 POGLM RECORD (1-3-95) .~1 vl D.S. 1-25 LEAK DETECTION (1-3-95) v,'l ~' 1 D.S. 3-27 BAKER IBP RECORD (12-31-94) v,1 -"1 D.S. 4-7 ST I PERF RECORD (12-30-94) ~/1 ,,'1 D.S. 4-22A PROD PROFILE (12-26-94) v,'l v' 1 ,, D.S. 6-4 PERF RECORD (12-25-94) ,,'1 -'1 D.S. 6-14A PERF RECORD (12-26-94) vl ,,'1 D.S. 9-4A PERF RECORD (12 23-94) ,,"1 D.S. 9-30 ST PERF RECORD (1-2-95) v/1 ~,~ i D.S. 9-32 PERF RECORD (12-25-94) .,/1 ..D.S. 11-16 ST I . LEAK DETECTION (12-31-94) ~1 D.S. 11-23A PERF RECORD (12-21-94) ~-1 DiS. 13-15 SBHPS & INJEC PROFILE (12-29-94) ,-T D.S. 13-33 LEAK DETECTION (12-30-94) I 1 D.S. 13-33 BAKER INFLAT BRIDGE PLUG RECORD (1-3-95) '1 D.S. 14-21 SBHPS & INJEC PROFILE (12-23-94) ~1 "'1 'D.S. 15-7A DUAL BURST TDT-P (12-27-94) v,1 D.S. 15-30 LEAK DETECTION (12-27-94) ~'1 ~-'1 D.S. 15-30 DUAL BURST TDT-P (CT/E-LINE) (12-30-94) ,,1 D.S. 18-9A DUAL BURST TDT-P (12~22-94) ~1 V'l D.S. 1e-27 DUAL BURST TDT-P (CT/E-LINE) (12-29-94) ~'1 SIGNED: DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. -.. STATE OF ALASKA .--- ,- ALASk OIL AND GAS CONSERVATION L ._ MMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 780' FSL, 21' FWL, Sec. 11, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic 6. Datum of elevation(DF or KB) 62 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-27 At top of productive interval 91' FNL, 67' FWL, Sec. 11, T10N, R15E, UM At effective depth 49' FSL, 96' FWL, Sec. 2, T10N, R15E, UM At total depth 62' FSL, 99' FWL, Sec. 2, T11 N, T15E, UM NOV 2 1 1994 Alaska Oil & (las Cons. Commi~on feet 9. Permit number/approval number 84-62 10. APl number 50 - 029-21109 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 10825 feet 9223 feet Effective depth: measured 10362 feet true vertical 8777 feet Plugs(measured) Cement Plug @ 10362' MD (10/16/94) ORIgiNAL Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1850 # Poleset 80' 80' Surface 2373' 13-3/8" 2000 sx CS III & 400 sx CS II 2404' 2403' Production 10172' 9-5/8" 500 sx CI "G" & 300 sx CS I 10203' 8623' Liner 924' 7" 340 sx CI "G" 9893-10817' 8330-9220' Tieback Liner 6222' 7" 3668-9890' 3606-8327' Perforation depth: measured 10250-10282'; 10286-10308' true vertical 8668-8700'; 8703-8725' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, Tbg @ 3632' MD; 4-1/2", 12.6#, L-80, Tbg @ 3632-5763' & 5971-7497' MD; 3-1/2", 9.3#, L-80, Tbg @ 5763-5941' & 7497-9821' MD Packers and SSSV (type and measured depth) Baker FB-1 packer @ 9726' MD; 5-1/2", Camco Bal-0 SSSV @ 2257' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Prior to well operation 329 189 8502 --- Subsequent to operation 396 -- 277 450 --- Tubing Pressure 321 3O6 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed v Title Engineering Supervisor Form 10-404 Rev 06/15/88 '1 ')~ A. II~ r,r,' k'7 . IWP Date SUBMIT IN DUPLICATE 3-27 DESCRIPTION OF WORK COMPLETED CEMENT DUMPS & CTU CEMENT SQUEEZE/PLUGBACK FOR WATER SHUT OFF 7/7/94: RIH & tagged PBTD at 10421' MD. 7/14/94: RIH w/dump bailer & dumped 4 bbls of Bentonite Gel, followed by 2 bbls of Latex Acid Resistant to spot a cement plug over leaking squeezed perforations in the lower wellbore. POOH w/bailer. Rigged down. 7/20/94: RIH & tagged PBTD at 10419' MD. 9/2/94: RIH w/dump bailer & dumped an additional 2 bbls of Bentonite, followed by 2 bbls of Latex Acid Resistant to raise the cement plug top to 10365' MD. POOH w/bailer. Rigged down. 9/6/94: RIH & tagged PBTD at 10381' MD. I 0/1 4/94: A CTU Cement Squeeze was performed for Water Shutoff as follows: MIRU CTU & PT equipment to 4000 psi. Loaded the wellbore w/Hot 1% KCI Water & RIH w/CT to cement squeeze the open perforatio.n...s located at: 9888 - 9889' MD (Z4) 10270 - 10282' MD (Z4) 10286 - 10292' MD (Z4) 10298 - 10310' MD (Z4) 10350 - 10360' MD (Z4) Ref. Log: BHCS 5/15/84 Pumped 5 bbls of Neat Latex Acid Resistive cement, followed by 34 bbls Latex Acid Resistive Cement w/20 ppb Aggregate, followed by 26 bbls Neat Latex Acid Resistive cement & placed an estimated 10 bbls of cement behind pipe at 3000 psi max squeeze pressure, held for I hour. Contaminated cement with biozan & jetted contaminated cement from the wellbore to 10360' MD. Left a cement plug in the lower wellbore below 10360' MD. POOH w/CT. Rigged down. 10/16/94: RIH & tagged the top of the cement plug at 10362' MD. 10/18/94: Reperforated: 10250 - 10282' MD (Z4) 10286 - 10308' MD (Z4) Ref. Log: BHCS 5/15/84 Used 2-1/8" carriers & shot 4 spf at 90 degree phasing at underbalanced pressures. Rigged down. Returned the well to production w/gas lift & obtained a valid production test. R E E E~V E D N0V 2 1 1994 Alaska 0ii & Gas Cons. Commission Anch0ra,/ 3-27 DESCRIPTION OF WORK COMPLETED FULLBORE ACID STIMULATION TREATMENT 11/15/94: RIH & tagged PBTD at 10304' MD. I I/1 9/94: MIRU & PT equipment. Fluid packed the wellbore w/200 bbls Crude down backside, then pumped a Fullbore Acid Stimulation for cement damage removal, through the open perforations located at: 1O250 - 1O282' MD (Z4) 10286 - 10308' MD (Z4) Ref. Log: BHCS 5/15/84. Pumped Stage #1: a) 100 bbls 1% NH4CI Water @ 2.2 bpm, followed by b) 100 bbls 50% Diesel/50% Xylene @ 2.5 bpm, followed by c) 25 bbls 12% HCI w/10% Xylene @ 2 bpm, followed by d) 15 bbls 9% HCI - 1% HF @2 bpm, followed by e) 80 bbls 1% NH4CI Water @ 2 bpm, followed by f) 10 bbls Benzoic Acid Flake Diverter in Saturated Salt Solution @ 2 bpm, followed by Stage #2: g) 125 bbls 12% HCI w/10% Xylene @ 2 bpm, followed by h) 60 bbls 9% HCI - 1% HF @2 bpm, followed by i) 220 bbls 1% NH4CI Water w/Musol @ 2 bpm, followed by I) 285 bbls Crude Flush @ 2.7 bpm, followed by m) 15 bbls Meth Water, followed by n) Shutdown. Rigged down. Placed well on production w/gas lift & obtained a valid production welltest. Future Sidetrack options for the well are currently being evaluated. GeoQuest 600 W. International Airport Road Anchorage, AK 99518-1199 ATTN." Sherfle NO. 9049 Company: I Alaska Oil & Gas Cons Camm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 10~26~94 Field: Prudhoe Bay Well Log De~::riptlon BL RR Sepia RF Sepia Mylar D.S. 1-15 -ff .~.~b .~, TUBG PUNCHER & POGLM SETTING RECORD (10-18-94) 1 1 I D.S. 3-18Ai~, ,?.~-~' ~2...--PERF RECORD (10-17-94) 1 1 D.S. 3-27 _~S~-~ .~,"~ PERF RECORD (10-18-94) 1 1 D.S. 4-32~'~"~-~ (~% RST-B (10-17-94) 1 1 SIGNED: Please sign and return one copy of this transmittal to Sherrle at the above addre~. Thank you. DATE: RECEIVED OCT 2 1994 Alaska Oil & Gas Cons. CemmJsslon Anchorage .: · . :.:.. .. . ..... :. ... .. :. ' .'..: .. · .. : .. ........ : · ARCO..:':'(ALAS'KA.)'.. . · :. · : . · ..:: · .....'.:. · . .. .......: · : ::..:........:.." .: :.. · . .. .... . ........: . .. S rvey.::'N6'::: ~:~~1:.'.'..'..'.. · . .'. P R UD H OE.:':B ~ .:: i: :':':'~'~.":::: :'::' D RILL .S ITE'.::#03 ~ 27..':"" .. '.: October: 2~: :1.994.':. : .: ...'...... ... .. ..:..: ..'.. ']:' Caliper Specialists Since 1953 KINLEY CORPORATION 5815 Royalton, Houston, Texas 77081-;~993 U.S.A. Phone (71 3) 664-4501 Telefax (71 3) 664-1 037 SERVICE AVAILABLE WORLDWIDE WITH ALL KINLEY WIRELINE TOOLS Calipers · Tubing Perforators · Sand Line Cutters · Power Jars · Measuring Line Cutters ARCO (ALASKA) Survey No. 24241.. .: .. : ,. · · :.. PRUDHOE BAY., AK=. DRILL SITE#03.27 October 2, 199.4 'Z Common Abbreviations 'ON TABilL4TION SHEET: IOINTS: are numbered from the top down. Numbering starts with the first full joint below the Christmas tree. PU~ IOINTS: are .designated by decimal numbers. For example, joint 32.1 represents the first pup joint below joint no. 32. SPECIAL TOOLS are designated by letters. For example, "B" is' the second special tool or nipple from the top of the weU. are numbered down from the top, as shown: GLM (1), GLM (2), etc. TABtIL4TION SYMBOL~ We use a cirde as the basic tabulation symbol. The Kinley Caliper records the-simultaneous action of all fifteen or thirty feelers. Our survey, therefore, has either 15 or 30 lines. These lines provide a view around the circumference of the inner surface of the pipe. A complete circle on the tabulation sheet Indicates that at least 14 of 15 feelers, or 28 of 30 feelers found tubIng wall reductions at the same depth In the well. 'This would be described as a ring. The .number of feelers that indicate tubing wall reductions at the same depth is also noted on the tabulation sheet. For a 15-Feeler Caliper ,,, For a 30-1~eeier Caliper ,D 12 to 19 '. D 20 to 27 D 28 to 30 , . A number alone repFesents the depth of penetration, expressed In hundredths of an Inch, of the deepest pit. In this example 0.08". '"'"' ":' '.'.':'. ~:": "' ':.' ?"? 'numl~ inside the'Circle represents the maximum depth of the ring, '. .. expressed in hundredlt~ of an'inch..,' ' :. . ,. , . - ,. [~ A PARTIAL RING.- A groove around the pipe, found by 3 to 13 of 15 feelers or 6 to 27 of ~0 teelers. The number inside the partial circle represents the maximum depth of the ting, expressed in hundredths of an inch. MINOR DAMAGE - Indicates a "minor" amount of damage that is not severe enough to warrant measurement. [~] NO COMMEI'4T - Indicates no damage was found In that joint. Arco (Alaska), Inc. Prudhoe Bay, AK Drill Site #03-27 October 2, 1994 Survey No. 24241 T-15 Chart No. 15212 & 11161 API #: 50-029-21109-00 This is the first survey of this well to be made with the Kinley Micrgscopic Caliper. The condition of the internal surface of the 3 1/2" 9.3~ EUE tubing in the well, from .5,763' to 5,971' and 3,497' to 9,800' (WLM). is covered in this report. A tandem run of this tubing was made. However, because of severe slippage in chart #11161 of the 3 1/2" tubing intervals, a composite analysis of both charts cannot be made. .3 1/2" 9.3# EUE (5,763' to 5,971') The deepest penetration recorded in the 3 1/2" 9.3# tubing between 5,763' and 5,971' of the survey is in an area of corrosion located in Joint #6. This penetration measures .18" or 71% of the tubing wall thickness. A cross-sectional drawing and photocopy of Jr. #8, at the location of the penetration, are included in the report. The condition of the tubing surveyed and analyzed ranges from fair to poor with respect to corrosive damage. Indications of damage are recorded in all of the joints in the form of corrosion of the tubing I.D. 3 1/2' 9.3# EUE (7,497' to 9,800') Complete penetrations ar~ recorded in Jt. #'s 48, 49, 51, 57, 70, and 93. In addition, a few of the joints recorded contain penetrations approaching the depth of a hole. Penetrations of these magnitudes may indicate holes of small diameter. Cross-sectional drawings and photocopies of Jr. #'s 48, 51, and 57, at the location of the holes and at a location representing a significant circumferential wall loss for each, are included in the report. The condition of the tubing surveyed and analyzed ranges from fair to poor with respect to corrosive damage. Indications of damage are recorded in most of the joints in the forms of holes, possible holes, areas of corrosion, lines of corrosion, and pits of the tubing I.D. The pup joints above and below the tool assemblies and GLM's are given individual joint numbers. Indication of corrosive activity is recorded in a few of these pup joints. Photocopies of the recordings for some of these assemblies are included in the report. ARCO (ALASKA), INC. Continued Prudhoe Bay, AK Drill Site #03-27 Page 2 Survey #24241 Many of the penetrations recorded in this survey exceed the maximum range of the photographic channels. The photocopies included in this report will have the tops of some of the penetrations cut off as a result. The chart was viewed with the Kinley Video Chart Reader to obtain accurate measurements of these penetrations, as the field of view is much larger. Most of the corrosive damage that is recorded throughout the 3 1/2" tubing intervals is widespread with respect to circumferential wall loss. As a result, the nominal I.D. is unknown and the penetration values given may be slightly different from the actual wall.loss. Slippage occurred throughout the survey, causing shorter'than normal recorded lengths of some joints in Chart #11161 and a complete loss of coverage for others. Therefore, the recordings in Chart #11161 were not used in this report. The joint numbering in this survey began at a depth of 5,763' at the cross-over between the upper 4 1/2" to 3 1/2" tubing string interval. The numbering is speculative throughout the lower 4 1/2" pull-through and lower 3 1/2" tubing interval because of drive-wheel slippage. Indications of corrosive damage was recorded in the 4 1/2" 12.6# EUE between the 3 1/2" tubing intervals. However, the 3 1/2" feelers cannot accurately monitor the corr6sive activity in the lower tubing string interval. CALIPER TECHNICIAN Steve Adcock jc SURVEY ANALYST Jon Chance Distribution: ARCO (ALASKA), INC., ATTENTION: Ms. Lillian Tiulana, P. O. Box 100360, AN0-848, Anchorage, AK 99510 (1R) ARCO (ALASKA), INC. Continued Prudhoe Bay, AK Drill Site #03-27 Page 3 Survey #24241 ARCO (ALASKA), INC., ATTENTION: Ms. Karla Zuspan, P. O. Box 100360, AN0-1529, Anchorage, AK 99510 (3R) AOGCC, ATTENTION: Mr. Larry Grant, 3001 Porcupine Drive, Anchorage, AK 99501 (1R) EXXON COMPANY U.S.A., INC., ATTENTION: Ms. Susan Nisbit, 800 Bell, Ste. 3083, Houston, TX 77002-7426 (1R) B. P. EXPLORATION, Petrotechnical Data Center, MB3-3, ATTENTION: Ms. Sonja Wallace, P. O. Box 196612, Anchorage, AK 99519-6612 (1R) ARCO (ALASKA), INC., ATTENTION: Mr. Mike. Shoemake/Mr. John Smart, P. O. Box 10-3240, Anchorage, AK 99510-3240 (1R) ARCO (ALASKA), INC., ATTENTION: Mr. Dan Stoltz, P. O. Box 10-3240, Anchorage, AK 99510-3240 (1R) ARCO (ALASKA), INC., ATTENTION: Mr. Jason Weaver, Room #AT0- 1788, Anchorage, AK 99510-3240 (1R) Chart received: Report faxed: Report mailed: 10-06-94 10-07-94 10-07-94 KINLEY CALIPER TALLY tEET (ComPosite) DRILL SITE #03-27 Survey # 24241 October 2, 1994 3 1/2" 9.3# EUE Body: 0.254 Upset: 0.379 Penetrations Over 85% JT. #'s 48 49 70 71 (Possible Hole) 50 51 55 72 76 93 Penetrations 41 - 85% (Poor) 56 57 61 50.1 112.2 114.1 114.2 1 2 4 5 6 53 54 58 59 60 62 63 64 65 66 67 68 69 73 74 75 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 Penetrations 21 - 40% (Fair) JT. #'s 50.2 63.1 63.2 89.2 101.1 Penetrations 11 - 20% (Good) 101.2 3 52 # of Jts 13 63 Penetrations 1 - 10% (Very Good) No Penetrations Recorded 44 TOTAL JOINTS SURVEYED: 131 ( Includes 16 Pup Joints ) DRILL SITE #03-27 PRUDHOE BA Y, AK October 2~ 1994 StJR%~(EY # 2424 I 3 I/2" ..9,3# CORROS1VE DAMA GE FREQUENCY DISTRIBUTIONS M/4XIMUM ?ENVY,%4 F~ON NUMBE~R OF JOINTS % WALL LOSS CON~GURA~ON NUMBER OF JOINTS DESC~P~ON BODY PE~N~ETR/~ TIONS % ¼¥qLZ LOSS 20 40 60 80 6 ~2 18 24 DRILL SIT£ 1103-27 Survey 1124241 3 1/2" 9.3# £U£ LD. = 2992 In, 8 O~ O0 9 0,12 7 0.02 10 O. ~8 6 O, 09 11 0.13 5 0.10 12 O, 14 4 O. 08 13 0,14 3 0.1o 14 0.11 2 0,10 I O. 08 I5 o. 0o Description: JL #5 CORROSION- ~ 18" = 71% Percent Area Reduction = 32.88 % Total Area Remaining = 1, 74 Sql/n, DRILL SITE #03-27 Survey #24241 3 I/2" 9, 3# EUE O.D 3.500 ln, I.D = 2992 In, 8 010 O. 08 7 0.10 10 0, I2 6 0~12 / / 1t 0~26 5 016 12 O, 14 4 0.12 13 0. t2 3 0.12 2 0~16 14 014. I 02~' 15 &20 Descriptiom JT, #48 HOLES m corrosion - ,26" = I00% Percent Area Reduction = 56~09 % Totat Area Remaining = I 14 Sq~In DRILL SITE #03-2? Survey #24241 3 1/2' 9~ 3# EUE 3.500 = 2,992 8 &26 9 0.26 7 0,20 10 tl O. 08 5 0, i0 12 0.06 4 0~14 13 0,15 3 O. 09 14 0,15 2 0,!0 I 0~12 15 0,13 Description: JT. #5l HOLES L,7 corrosion., ,26" = t00% Percent Area Reduction = 55. 15 % Total Area Remainin9 = 1.16 Sq./n, DRILL SITE #03-27 Survey #2424 t 3 l/2" 9, 3# EUE O.D, = &5OO In LD, = 2,992 8 026 0.26 7 &18 10 0~26 010 tl 0.16 5 0.04 12 0,10 4 0.14 ¸13 0,08 3 O, 10 2 t 008 15 0 08 14 006 Description:' JL #57 HOLES u,B, in corros£on - ,26" = 100% Percent Area Reduction = 51, I2 % Total Area Remain/nB = !,27 Sq. in, KINLEY 3 1/2" 9.3# EUE Body: 0.254 Upset: 0.379 Chad # 15212 1116 Feeler Ratio I · 1 PER JOINT TAB ULAfWgON SHEET DRILL SITE #03-27 PRUDHOE BAY, AK Survey # 24241 October 2, 1994 Run # 1 MAXIMUM MAXIMUM UPSET/MAKEUP BODY JOINT PENETRATION PENETRATION DAMAGE NO % INCHES % INCHES .COMMENTS vi (%WALL) 1 59 0.15 Corr.; lstfulllengthJLof3 1/2" 9.3# EUE analyzed~ ........... 2 47 0.12 Corr. 3 35 0.09 Corr. 3.1 How coupling; GLM (2) 3.2 8 0.02 Shallow corr.; Flow coupling 4 55 0.14 Corr. 5 63 0.16 Corr. 6 71 0.18 Corr.; X-over to 4 1/2" 12.6g EUE 7 1st Jt of 4 1/2" below X-9ver; Jt. #'s 7 - 47 are not analyzable 8 9 10 11 12 13 14 15 , 16 17 18 19 20 21 22 23 25 26 27 28 29 ., 30, 31 32 33 34 35 36 37,,, 38 39 41 42 43 45 47 X-over to 3 1/2" 9.3# EUE 48 100 0.26 HOLES in corr. 49 100 0.26 HOLES u.B. in corr. 50 94 0.24 Possible holes in corr. , -BODY I -UPSET KINLEY CA 3 1/2" 9.3# EUE Body: 0.254 Upset: 0.379 Chart# 15212 1116 Feeler Ratio 1 · I PER JOINT TAB ULAiTgON SHEET DRILL SITE #03-27 PRUDHOE BAY, AK Survey # 24241 October 2, 1994 Run # 1 MAXIMUM MAXIMUM UPSET/MAKEUP BODY JOINT PENETRATION PENETRATION DAMAGE NO % INCHES % INCHES COMMENTS 50.1 43 0.11 Corr.; Flow coupling; GLM (3) 50.2 39 0.10 Pits u.B.; Flow coupling 51 100 0.26 HOLES in corr. 52 39 0.10 Corr. 53 55 0.14 Corr. 54 51 0.13 Corr. 55 91 0.23 Possible holes in corr. 56 87 0.22 Possible holes in corr. 57 100 0.26 HOLE u.B. in corr. 58 63 0.16 Corr. 59 79 0.20 Corr. 60 63 0.16 Corr. 61 91 0.23 Possible holes in corr. 62 79 0.20 Corr. 63 75 0.19 Con'. 63.1 39 0.10 Corr.; Flow coupling; GLM (4) 63.2 31 0.08 Corr.; Flow coupling 64 63 0.16 Corr. 65 67 0.17 Corr. 66 71 0.18 Corr. 67 79 0.20 Con'. 68 79 0.20 Corr. 69 79 0.20 Corr. 70 100 0.26 HOLES in corr. 71 87 0.22 Possible holes in corr. 72 87 0.22 Possible holes 1.B. in corr. 73 75 0.19 Corr. 74 67 0.17 Corr. 75 67 0.17 Corr. 76 87 0.22 Possible holes in corr. 76.1 16 0.04 Shallow corr.; How coupling; GLM (5) 76.2 How coupling 77 63 0.16 Corr. 78 59 0.15 Con'. 79 75 0.19 Corr. 80 47 0.12 Corr. 81 63 0.16 Corr. 82 55 0.14 Corr. 83 59 0.15 Con'. 84 71 0.18 COrr. 85 47 0.12 Corr. 86 71 0.18 Corr. 87 71 0.18 COrr. 88 67 0.17 Corr. 89 79 0.20 Con'. 89.1 Flow coupling; GLM (6) 89.2 35 0.09 Line of corr.; How coupling 90 63 0.16 Con'. 91 55 0.14 Con'. 92 55 0.14 Con'. 93 100 0.26 HOLES in con' 94 63 0.16 Corr. 95 55 0.14 Corr. _ 96 71 0.18 Corr. 97 71 0.18 Corr. 98 55 0.14 Con'. 99 59 0.15 Con'. 100 67 0.17 Corr. -BODY I -UPSET JOINT NO KINLEY 3 1/2" 9.3# EUE Body: 0.254 Upset: 0.379 Chad # 15212 1116 Feeler Ratio 1 · 1 PER JOINT TAB ULA VtON SHEET DRILL SITE #03-27 PRUDHOE BAY, AK Survey # 24241 October 2, 1994 Run # 1 MAXIMUM MAXIMUM UPSET/MAKEUP BODY PENETRATION PENETRATION COMMENTS Corr. Line of corr.; Flow coupling; GLM (7) Line of corr. Flow coupling Corr. Corr. Corr. Corr. Corr. Corr. Corr. Corr. Corr. Corr. Corr. Line of corr.; Flow coupling; GLM (8) Line of corr.; Flow coupling Corr. Line of corr. Line of corr.; Pup Jt. Flow cou Seal Assembly (B) ends in Jt. #115 @ 9,800' (WLM) DAMAGE PROFILE (% WALL) 100 ~-BODY mm -UPSET :i ........ t : I : _, '. I t I I' ' ,, "'.;.:' ,'i.'J, ,:,: 4 . '."'.' "vt,,*' ~'~. '~."~-: ' ".'~'?**'q'"'"* ". : '<'"'.'; · /;:,~, ' ": ,.. .~ . . - - - - - i _=~__~.,.,--_ ' ,.~ &,~q..~,.. :- ~-__..~-_..m --.-,,a_ :.- 't 't '~ .: . ,, ._ · :~,..~: : ~ ~~', ..__~_ ..... ": .....- -------- --- :': : : L~_ :: _. ,t '~l, :, -' '. _ ., .................... t : --I-' .................................... .' .......................................................... :t- TI' -- : I -- 't · Il.._ ~ ~ ~ = ~ .... 1. -c _-- - il'..; :l. .l l:..-' ::,~ ........................................... ._'.:: ............................... L..~_ ...... _:._. ......... - .......... : _- =% --.=-_~__: _-!,~_-~i ' , ' - ...... : : :,: . ~ : ............................. -,... ....... :- .................... [ .................................................... : ................ . i __ ii '1 ........ ARCO Alaska, Inc. Date: June 14, 1994 P.O. Box 100360, ;horage, AK 99510~~k, Transmittal #: 94045 ~~P' Subject: From/Location: Telephone: To/Location: ARCO Cased Hole Finals John E. DeGrey/ATO-1529 (907) 263-4310 Distribution Well i Log Datei Tool Type NumberI (M-D-Y) 1-10A ! 06-02-94 i/' USIT 2-33 i 05-22-94 . 3-18A ! 05-19-94 i~ CCL 3-27 i 05-24-94 j/BAKER IBP REC 4-07ST ! 05-26-94 1~' PERF REC 4-11A i 06-04-94 ~/ INJ PROFILE 4-19 i 05-25-94 !J USIT RECEIV'ED UN 2 0 7994 A!2skc O J! & Gas Cons. Commission FI u n, ¢ontra~or i 1 5" SCH [ I 5" [ 1 5" [ 1 5" : 1 I 5" I 5" 4-46 [ 06-04-94--~¢Pr°ducti°n Profile! 1. "5" 5-3A ! 06-02-94 !/ COL I 1, 5" 6-3 !' 06-03-94 1/' PERF REC i 1, 5" i 05-22-94 FP~atch Setting Reci I 5" [ 06-05-94 kTub~in9 Puncher! 1 5" 1 5" ! 5" I 5" 1 5" 1 5" 6-10 6-16 [ f CNL SCH SCH SCH 6-22A { 05-22-94 7-4A i 05-21-94 iv 7-6 [ 05-21-94 ivProduction Profile i 7-7A [ 05-20-94 7-18 ! 05-21-94 7-23 i 05-24-94 i '/ CCL [ 1, 1"5" 7-26 i 05-21-94 iv Prod Profile ~ 1, 5" · 7-28 [ 05-26-94 1¢' Perf Rec i 1, 5" 9-13 i 05-25-94 i ~' Bridge Plug i 1, 5" 9-44 i 05-20-94 ~roduction Profile i 1, 5" SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH 9-50 [ 05-20-94 i/Production Profile [ 1, 1" 5" SCH 11-291 [ 05-31-94 t J CNL j 1, 5" SCH 11-291-i 05-30-94 I ~ USIT i 1, 5" SCH 11-291 I °5'31'94 I f TDT-~ [ 1, 5" SCH 11-291 i 05-30-94 i/' CBT i 15" SCH 11-35 · 05-31-94~'i i USIT i I 5" 11-35 i 05-31-94 l'"' CBT 11-36 [ 05-23-94 ]/- CBT 14-3 [06-03-94i'~' PERFREC 14-12 ! 05-Z8-941f GRLOG 14-12 I 05-28-94 f~Production Profile 14-20 106-01-94 i,/' PERFREC 14-34 I 06-01-941~ PERFREC 16-13 ! 05-24-94 Baker IBP Rec 17-12 ! 06-05-94 lJ Leak Detection 17-19 i 05-26-94 I / PERF REC SCH 18-1 I 06-04-94 ~' Pack Off Gas Lift 18-1 [ 06-04-94 t/Tubing Puncher 1 5" 1 5" SCH I 5" SOH 1.5" 1 5" I 5" 1 5" 1, 1" 2" 5" ! 5II SCH ! 5I1 SCH SCH SCH SCH SCH SCH SCH 1, 5" SCH SCH ARCO Alaska, Inc. Is a Subsidiary of AttantJcRIchfleldCompany ARCO Alaska, Inc. Date: Feb 16, 1994 P.O. Box 100360, ;orage, AK 99510~~ Transmittal #: 94023 Subject: ARCO C~ From/Location: John E. DeGrey/ATO-1529 Telephone: (907) 263-4310 To/Location: Distribution iwellNumber iL°g(M-D-Y),Datel Tool Type i RUn,scale C°ntract°r ~,- F~ ~ 1-24A I 12-24-92 1 PFC/GR I 1, 5" Atlas '~'~" t'~ i PWDW l 01'24'94 I Static press/Temp I 1,5" Sch ~ ~ 2-1 , , ~c¢01~- f~2-$ ~) ~~ ~3-1 ! 1-30-94 i Pe~RecOrd ~ 1,5" Sch ~~ ~3-1 ! 2-5-94 i CNL , 1, 5" Sch ~ ~? l 3-20A ~ 2-2-94 ~ Peal R~ord ~ 1, 5" Sch ~-~% ~ 3-21 i 2-4-94 i CompIR~ord ~ 1,5" Sch ~5- ~ ~ 3-25A I 2-4-94 t CompI R~ord i 1, 5" Sch ~- ~ i 3-27 I 2-3-94 ~ Prod Profile ~ 1, 1"&5" Sch S~- ~ ! 3-32 ¢ 1-25-94 !~t Bridge Plug ~{ 1, 5" Sch ~- ! 4-~ i 1-26-94 ~ Tubin~ C~er~ 1, 5" Sch ~ --[ 4-32 ~ 2-2-94 j Compi R~ord ~ 1, 5" Sch ~~ ~4-46 j 2-6-94 ] USIT/Cement ~~ 1,5" Sch 4-46 ~ 2-6-94 ] PDC&Jewerly 1, 5" Sch ~- ~% '5-35 ~ 2-7~94 ~ Leak Det~ { 1, 2" Sch ~.~ ~ 9-9 ~ 2-7-94 ! LeakDet~ 1, 2"&5" Sch 9-9 } 1-26-94 ~ Leak Detec ~ 1, 1"&5" Sch ~ ~ I 9-11 ~ 1-24-94 Bdd~e Plu~%~ ~1, 5"(~ Sch %~- ~ 9-20 1-24-94 Uilnj Profile 1, 5" Sch ~S- ~ ~ 9-34 1-25-94 ~t Brid~e Plug ~ 1, 5" Sch j 11- 2-3-94 b~ Bddge Plug 1, 5" Sch ~ ~* 16ST1 ~; '[~~ I~ ~-~ i 11-17 2-5-94 Leak Det~ 1, 1"&5" Sch t~ ~ 12-16A 2-2-94 Pe¢ R~ord 1, 5" Sch ~-~ ~14-2B 2-3-94 USlT/Cement 1, 5" Sch ~14-2B ~ 2-4-94 Pe¢ R~ord 1, 5" Sch ~- ~ ~ ~ 14-31 2-4-94 Prod Profile 1, 5" Sch ~%- I~R ~ 15-9A 2-6-94 Pe¢ R~o~ 1, 5" Sch ~ ~ ~ 15-22 2~-94 Pe¢ R~o~ 1, 5" Sch ~5-~ ~ 16-7 6-16-92 ~ Casing Colbr (¢;~ 1, 5" Atlas ~0~ ~ ~ 16-22 2-3-94 ~ G~l~suwey ~ 1, 1" Sch ~ e~ ~ 16-29A ~ 1-31-94 ~ Prod Log ~ 1, 1"&5" Sch * D~ 1-24STthe corr~t well n~e is 1-24A ** DSC 11-16ST1 the correct API~ is 50-029-2158i-00 Number of Records:32 M4~ 1 John E. DeGrey ARCO Alask~ Inc. Is a Subsldlarlf of AtlantlcRlchfi~dCompany ARCO Alaska. Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 10-2-92 REFERENCE: ~-~-92 ~ ~21~ ~31~ i~18 ~21-~ ARCO CASED HOLE FINALS Prod Profile Prod Profile Prod Profile Prod Profile ~-~-~ 5-:10 8-30-92 GR/Co;;== 7* PITS 8-24-92 Collar/Baker IBP 9-1-9~ Prof Profile 9-1-9'2 Prod Profile 8~~ 8-24-93 GRPerfBreakd°wn ~.23-93 RunL5' Run L 5" Run L ~' l~m LiT Run L ~' l~m 1,5" l~m 1, 5" Run L ~' Run L ~' Run 1, ~° Run 1, ~° l~m 1, ~' l~m 1, ~' RunLW Run L ~' RunL~' Please sign and return th~ atta~ copy u receipt of data. RECEIVED SonyaWalLace OCT 0 5 1992 APPROVED_ ATO-1529 Alagla 0ii & Gas Cons, ~ommi~# 9221~ ' # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON # MOBIL # PHILLIPS PB WEI~ FILF~ R&D # BPX # STATE OF ALASKA Cnmco C~mco Camco ~mco ~m~ ~mco ~m~ ~m~ ~m~ ~m~ ~mco ~co ~mco ~mco ~m~o ~m~ * This is not a field print for 1-11. ARCO Alaska, Inc. P.O.Box 100360 Anchorage, ,~l~s~r~ 99510 DATE: 10-2-92 REFERENCE: ARCO CASED HOr.~ ~ 12-14ST 8-1-92 14-3 ~26-92 ****** 16-31 ~'2---7.r" 6-25-92 Perf Run L 5" HLS Perf Run 1, 5" HLS Per/ Run 1, 5" HLS Per/ Run 1, 5" HLS Collar l~m 1, 5" Perf Run 1, 5" Perf Run 1, 5" ]HIS Perf l~m 1, 5" HLS Perf Run L 5" BLS Perf Run 1, 5" HLS Pert' Run 1, 5" HLS Peri' Run 1, 5" HIS Perf Run 1, 5" HLS Collar Run L 5" BLS Perf Run L 5" BLS Collar l~m LS" BIS Perf l~m 1, 5" Perf Run L 5" HLS Perf R,m L 5" HLS Peri' l~m 1, 5" BL~ Please sign and return.~~ tta~~_copy as receipt of data. RECEIVED~ Sonya Wallace OC T 0,5 1992 ATO-1529 Alaska Oil & Gas Cons. # CENTRAL # CHEVRON # EXTENSION EXPLORATION # EXXON # MOBIL # p~rr~.~.rps PB WELL ~ # BPX # STATE OF ALASKA Th~ ~ ~ nsm~ J~ l-lB. The correct APl # for 1-LB is 50-(Y'29-21~1. The cra'feet ~ -~me is 6-14J~C.~ The correct API· ~ 7-4A is 50-029-~1. The ~ APl # fro- 14-1 is 504Y29-20317-00. The correct APl # f~ 14-5A Is 50-029-~327~1. The ~ API# for 16-31 is 50-02~22280-00. REPORT ,jF SUNDRY WELL OPIcRATIONS 1. Operations performed: STATE OF ALASKA ,~__~~ ALASK,a~-'-"'L AND GAS CONSERVATION C¢-'-"MISSION 0 ~ I rd 1 N 2. Name of Operator ARCO Alaska, Inc. Operation shutdown Stimulate Plugging X Perforate ~ Pulltubing AItercasing Repair well Other X 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service RECEIVEB JUl ~0 ~o~ ~,!as~a .0il .& Gas Co,~s. Commission 6. Datum of elevation(DF or KB) 62 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-27 9. Permit number/approval number 84-62 10. APl number 50 - 029-21109 11. Field/Pool Prudhoe Bay Oil Pool 4. Location of well at surface 780' FSL, 21' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 91' FNL, 67' FWL, Sec. 11, T10N, R15E, UM At effective depth 49' FSL, 96' FWL, Sec. 2, T10N, R15E, UM At total depth 62' FSL, 99' FWL, Sec. 2, T11N, R15E, UM 10825 feet 9223 feet Plugs(measured) Cement Plug @ 10431' MD (6/28/92) 12. Present well condition summary Total depth: measured true vertical Effective depth: measured 10431 feet true vertical 8843 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1850# Poleset 80' 80' Sudace 2373' 13-3/8" 2000 sx CS III & 400 sx CS II 2404' 2403' Production 10172' 9-5/8" 500 sx CI "G" & 300 sx CS I 10203' 8623' Liner 924' 7" 340 sx CI "G" 9893-10817' 8330-9220' Tieback Liner 6222' 7" 3668-9890' 3606-8327' Perforation depth: measured 10270-10282'; 10286-10292'; 10298-10310'; 10350-10360'; 10381-10398' true vertical 8689-8700'; 8703-8709'; 8715-8726'; 8765-8775'; 8795-8811' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 3632' MD; 4-1/2", 12.6~, L-80, PCT @ 7497' MD; 3-1/2", 9.3#, L-80, PCT @ 9821' MD Packers and SSSV (type and measured depth) Baker FB-1 packer @ 9726' MD; 5-1/2", Camco Bal-0 SSSV @ 2257' MD Tubing Pressure 297 350 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data, OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Prior to well operation 528 880 6825 -- Subsequent to operation 595 278 1302 -- 16. Status of well classification as: Oil X Gas~ Suspended Service 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 850/9 WHS cc: SW, JWP 3-27 DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE FOR WATER SHUT OFF 6/19/92: An Acid Wash & CTU Cement Squeeze were performed for Water Shutoff as follows: MIRU CTU & PT equipment to 4500 psi. Loaded wellbore with hot 1% KCl Water & RIH w/CT to reciprocate an acid wash across the open perforations at: 10270 - 10282' MD (Z4) 10290 - 10318' MD (Z4) 10368 - 10378' MD (Z3) 10388 - 10398' MD (Z3) Ref. Log: BHCS 5/15/84 Pumped 60 bbls 12% HCl - 10% Xylene, then flushed acid into the formation with 60 bbls seawater. Pumped 5 bbls of Neat Latex Acid Resistive cement, followed by 47 bbls Latex Acid Resistive Cement w/Aggregate. Placed 17 bbls of cement behind pipe at 3500 psi max squeeze pressure held for 1 hour. Contaminated cement w/biozan & jetted contaminated cement from wellbore down to 10420' MD. Left a cement plug in the wellbore below 10420' MD. POOH w/CT. Rigged down. 6/21/92: RIH & tagged the top of the cement plug at 10430' MD. 6~28~92: Reperforated: 10270 - 10282' MD (Z4) 10290 - 10292' MD (Z4) 10298 - 10310' MD (Z4) 10350 - 10360' MD (Z4) 10388 - 10398' MD (Z3) Added perforations: 10286 - 10290' MD (Z4) 10381 10388' MD (Z3) Tagged top of cement at 10431' MD. Rigged down. Ref. Log: BHCS Ref. Log: BHCS 5/15/84 5/15/84 Returned the well to production & obtained a valid production test. // ARCO ,~l~ska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 5-29-92 REFERENCE: ~'~'~ 1-18 ?o~/ 2-6/ .- ~/~' 3-27 / ~~* 7-7A5'10 --" j~ 7-9 / 7-1~ ~/ ~7.>> 9-14 -- l~-~ 9-25 / ~/~ 9-32 ~ 2~/>r 14-33 ARCO CASED HOLE FINALS 5-5-92. Le_~_k Detect 5-11-92 Prod Profile R~n 5-8-92 Prod Profile R!~n 5-7-92 PITS 5-10-92 PITS Run 5-8-92 Prod Profile Run 5-11-92 Prod Profile 5-8-92 Prod Profile 5-11-92 C/.B_P. 5-11-92 Jewelry 5-11-92 Inj Profile 5-6-92 -Pump-In Spinner Run 5-5-92 Prod Profile Run 5-7-92 Gas Entry Run It 5tt 1, 5" 1, 5' 1, 5" 1, '5" 1, 5" 1, 5" 1, 5t! 1, 5" 1, 5" 1, 5" 1, 5" 1, 5" 1, 5" C8111C0 Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Please sign and return the attached copy as receipt of data. RECEIVED Have A Nice Day! Sonya Wallace ATO- 1529 APPROVED Trans# 92109a -CEIVED JUN 08 199; Oil & Gas Cons. Commission Anchorage # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO * The correct APl# for 5-10 is 50-029-20263 AR(](] AI.__ASKA, INC. F'. O. BOX { ()("}S60 .~ A 1... ~-~ s K A :? -"~ A N C I--t 0 R A (:; E, " .... -- ' DATE' ii--8-9t REFERENCE' ARCO MAGNETIC TAF'E(~> WITH LISTING(S) ,-,,'l.-\ -~3'-22 7-i S-gt FDK-t ~}O/CCL/GR ~ . JOB~898i 3 i t -22 7-i -91 F'DK-i ~?,O/CCL/GI;' PLEASE SIGN A~N T~ ATTACHED COF'Y AZ RECEIF'T OF DATA. XONYA W,-,L.L. ACE . ATLAS ATLA3 ATLAS D I ~-; TR ]: BUT ]: ON · "- Fi...EN I RMI_' -- '" FILE~TM (CH) ~ PH fI_L:[F'3T CHEVRON F'B WELL F]:LE:~' D & M R & D TAHMA.~.; BROWN (OH/GCT) $ BPX · .-" EXXON $ ,,'~TATE OF r.~Lr-~,~ K A , .... . ...... -: MARATHON ..... ~ ............ : ...... ::_:::~..~,., T EXA C 0 ': .... ~ ...... ::' ::- :":' ....... :':: M 0 B I L .... ' ...... : ': ...... :._--- :--,.:.:.~: : :~ -::-:-..'.: -'- . ......' ..,: ,... ':-~-.:; '::':~----~.-._: '..'~ ARCO ALA.".','KA~ INC~ REFERENCE:. ARCO MAGNETIC TAPE(S) WIT~i. LI$]'ING(~') -. 'l~.~ ~ .... :~... ~ ~,- , ,.---2-2t , ~7-t 9-9t DSN RUN ~~ / JO~.,k~8 7~'-X ~t~/~-'27~ 7-tS-9t F'DK-tOG/GR/CC~,~ JOB~898t2 ob ~-S 7-i ~b-9t F'DK-t O0/GR~SCL~. JOB~8~28O8 $)Xo~' ~---':~i 7-i i--?t CNL-GR~~7~ ~=l~ D~N ~UN t~~.~[~-o~] JOB~LTO928-G p~OB~8~82~ ~Y~-~ 7-~ .4-~ ~~:i Z~ 8~ 5--t 8-89 F'~K-I Oe/GR/CCL~ b~ JrJB~8~8~ 4 TMD RUN t *-x'CORRECTED**~ JOB~LtS5t2-4 NN'~t-t8~/ 7-t2-9t TMD RUN t~ JOB~L667S2"6 ~ ' ~ ~ D~N RUN t~ ,~ 4-2~ ~-28-E t JOB~L66746-~ PI_EASE ~'IGN AND RETURN THE ATTACHED COF'Y A~ RECEIPT OF DATA. RECEIVED itAVE A NICE DA'W~ NF:w. ~,, 0 ~ONYA ~ALL~CE ATO-i 529 Aias~a Oil & HL~' ATLA~ A'FLA$ Ai"I_A2' HL$ ATLAS ATI_A$ H[..~ HL$ HL~ · '¢ CENTF(AL FILES (CH) ~ I::'HILL'[FI~ " '-PB WELL F'ILE$ .... '.CHEVRON_ .:, =:~._,:.~:: . . .:_.. .. . .... : .......... ...... "=-' ......... ':"D '& H ......................... "' ...... ' ............ 'R & D . .'-::--- ...... :~.~,-'.:::. ........ :,:.',,-:~:--~- ,.;:,'.:: -,; .-,:~;?'-~..'-. TAMHA$ BROWN (OH/GCT) ~ BPX '-.~ EXXON ~ ~ ~TAI'E OF ALASKA MARATHON TEXACO HOBIL * F'I_EA£'E REPLACE WITH NEW COPY AND DESTROY THE OLD COPY. /' ARCO ALASKA, INC. F'~O. BOX 100~60 ANCHORAGE, ALASKA 9t DATE' 9-t9-9t REFERENCE' ARCO CASED HOLE FINALS 8 x-2-S 6-'~'~-9.-. t PERF RECORD RUN t , 5 · '-'~-':.~ o 5-3t-9~. F'ERF RECORD RUN ~ , .~" -2-9 8-~6-9~ PERF RECORD RUN ~, 5' -2-26. 5-S~-9~ PERF RECORD RUN ~ , 5" ~ ~S-~7- 8-~6-9~ PERF RECORD RUN ~, ~u" -4-22. ~_o~_o~. ,~ F'ERF RECORD RUN ~, 5" '5-5 5--24-9 ~ PERF RECORD RUN %. x_~_t ~- '~8-28-9~ F'ERF RECORD RUN t , 5' 7-J ~ 6-~-9~ PERF RECORD RUN ~ J-4 7-29-9J PERF RECORD RUN ~, 5' ' ~ ~-o~ PERF RECOPD -Ji ~ r-2~ , , RUN · '42-J4 8-6-9J F'ERF RECORD RUN ~, 5' -J2-28 5-29-9~ PERF RECORD RUN j3-28 8-~ 9-9~ PERF RECORD RUN $ ~J4-gB 8-2~-9J PERF RECORD RUN x~5-25 8-J-9~ PERF RECORD RUN ~, 5' PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIF'T OF DATA. HAVE A NICE DAY! ?. ONYA WALLACE ATO- i 529 HL£' I-ILS HL£' I--ILS 14L.£' i--IL Z HL$ HLZ HLS' HL~ HLS HL,g' HLS' HL$ HL£ HLS HLS HL$ HLZ HL$ HLS' HL$ DISTRIBUTION CENTRAl_. FILE~ CHEVRON D&M EVTENelON.. ~ EXPLORATION EXXON MARATHON MOBIL F'HILLIP~ F'B WELL FILE¢~ R & D BPX ~TATE OF ALASKA TEXACO ;::-.. - ,,.) -~ TFIF CORRECT AF']:¢- FOR f-tB Is' :0-.~.-9- t007-0t ~ THE CORRECT AF'I~ FOR 2-5 I$ 50-029-20077. '"- THE CORRECT API· FOR ~-":.:"? IS' '=; ,":", - ,'.", ':-:' q - ":-:' l t 09 THE COF.'RECT LOG INT. FOR 5-~2 IZ 8836'-9249~ $ THE CORRECT AF'I$ FOR t4-9B I~' 50-,929-205-54-~2. RECEIVED OCT 0 5 1991 Oil g 8aa Cons. C~fr~rni~/on 1. Operations performed: STATE OF ALASKA ALASKA AND GAS CONSERVATION REPORT OF SUNDRY WELL OPERATIORS Stimulate Alter casing Plugging Repair well Perforate ~ Other X Operation shutdown Pull tubing 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development X~ Exploratory StralJgraphic 6. Datum of elevation(DF or KB) 62 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-27 9. Permit number/approval number 84-62 10. APl number 50 - 029-21109 11. Field/Pool Prudhoe Bay Oil Pool 4. Location of well at surface 780' FSL, 21' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 91' FNL, 67' FWL, Sec. 11, T10N, R15E, UM At effective depth 49' FSL, 96' FWL, Sec. 2, T10N, R15E, UM At total depth 62' FSL, 99' FWL, Sec. 2, T11N, R15E, UM Present well condition summary Total depth: measured true vertical 10825 feet 9223 feet Plugs(measured) 10458' MD; 8870' TVD Effective depth: measured 10458 feet true vertical 8870 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1850# Poleset 80' 80' Sudace 2373' 13-3/8" 2000 sx CS III & 400 sx CS II 2404' 2403' Production 10172' 9-5/8" 500 sx Cl 'G' & 300 sx CS I 10203' 8623' Liner 924' 7" 340 sx Cl 'G' 9893-10817' 8330-9220' Tieback Liner 6222' 7" 3668-9890' 3606-8327' Perforation depth: measured 10270-10282'; 10290-10318',10368-10378', 10388-10398' true vertical 8689-8700'; 8708-8735', 8783-8793', 8803-8813' 12. Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 3632' MD; 4-1/2", 12.6#, L-80, PCT @ 7497' MD; 3-1/2", 9.3#, L-80, PCT @ 9821' MD Packers and SSSV (type and measured depth) Baker FB-1 packer @ 9726' MD; 5-1/2", Camco Bal-0 $SSV @ 2257' MD 13. Stimulation or cement squeeze summary ¢EIVED Intervals treated(measured) N/A Treatment description including volumes used and final pressure Prior to well operation Subsequent to operation S E P 1 1991 Reoresentative Daily Average Produ~ion or Ini~ion Data ~ Anchor~e. Oil-Bbl Gas-Md Wator-Bbl Oasing ~rossure ruumg Pressure / 625 / 2059 5~7 1800 304 3789 ~' 8559 2023 800 357 14. 16. Status of well classification as: Oil x.~_ Gas__. Suspended__ Service 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations Date /"]//'/¢ / , SUBMIT IN DUPLICATE 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed "~~~,. ~), ~,~% _'~~ Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 ----. i ~-~...~. ~'1-~"'~ 4,4"70 OLI I%AID SUMMARY OF WELl. OPERATIONS ARCO Alaska, Inc. perforated DS 3-27 at selected intervals in the Sadlerochit Sand of the Prudhoe Bay Unit on 8/16/91 (10368-10378'MD, 10388-10398'MD Ref Log: BHCS 5/15/84). Produced fluids were in the wellbore during perforating operations. All wireline work was done through a 5000 psi WP BOP/Lubricator tested to 1.2 times the maximum expected surface pressure. The SSSV was installed at the conclusion of the perforating and clean-up operation. A short summary of the work is given below. - Began perforating operation on 8/16/91. - RU perforating unit and pressure tested equipment to 3000 psi. - RIH w/gun #1, tied-in, and shot #lA: 10388-10398'MD @ 0.5 spf. tied-in, and shot #lB: 10368-10378'MD @ 0.5 spf. - SI well. - POOH. Ail shots fired. Secured well. RD. 6 5 4 3 . BOP E0U l PHEN~ 1. 5C)00PSI?" W£LLHEAD CON~CTOR FLANGE 2. ~)000PSI4 1/16" PIPE RAMS 3. 5000 PSI4 1/6" HYDRAULIC SLIPS 4. 5000 PSi4 1/6" SHEAR RAJAS 5. 5000 PSi4 1/6-BLIND RAIDS 6. 5000 PSi4 1/16" sTurrl~ Box 2 RECEIVED S£p 7 ~ 19~t .oil.& Gas Cons. CommJssien ;ad?chorage HIRELINE BOP EOUIPMENT _ 1. 5000 PSI ?" WELLH£AD CONN£C10R fLANGE 2. 5000 PSI WlRELIN[ RAMS (VARIABLE 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-Orr ARCO ALASKA, INC. F'.O. BOX J00360 .... ANCHORAGE, ALASKA 995. .~DATE: 8-2-~i REFERENCE' ARCO CASED HOLE FINALS t-4 · 3-i 6-9t 2-3. 5-22-9t 5-2 - 4-22-9J 3-2 · 5-26-9t 3-22 · 7-t 3-9t 3-27- 3-t5-9t ~ __,,3-27' 7-i 3-9i -/~5-i 9' 7-i 4-9t 7-4' 7-23' 7-28 - 5-25-9t 9-4- 9-~ 5-t -9t -4g~ '7-~ ~-~ ** t t-25- 7-t 4-9t *** 1 6-9A · 6-3-91 F'ERF RECORD PERF RECORD CCL PERF RECORD PDK-~OO/GR/CCL RERF RECORD RDK-~OO/GR/CCL CNL COLLAR LOG RERF RECORD COLLAR LOG TUBING PATCH F'ERF RECORD RERF RECORD PDK-iOS/GR/CCL-BORAX CCL-RERF RECORD JEWELRY-COMPLETION RECORD PERF-JEWELRY RECORD CNL PERF RECORD RUN t , 5' RUN t , 5 · RUN t , 5" RUN t, 5" RUN t, D' RUN t, 5' RUN t, 5' RUN t , 5' RUN t , 5' RUN I, 5 · RUN J, 5' RUN i , 5' RUN i , 5' RUN i , 5' RUN i , 5' RUN t, 5' RUN t , 5' RUN J , 5' RUN ~, 5' RUN J, 5 · PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF' DA]'A~ RECEIVED BY ~3~___________~ HAVE A NICE DAY! $ONYA WALLACE ATO-t 529 HL$ HL$ HL$ HL$ ATLAS HL$ ATLAS $CH HL~' HL$ HLS' HL$ HL3 HL$ A'rLA~' ATLAS HL$ HL$ $CH HL$ DISTRIBUTION CENTRAL FILES 1' -.--"- CHEVRON D & M ' EXTENSION EXPLORATION - EXXON -r MARATHON ~ MOBIL PHILLIPS F'B WELL FILES R & D BPX STATE OF ALASKA TEXACO * THE CORRECTED LOG INTERVAL FOR 9-46 I~' t44(~8'-t5t68'. ** THE CORRECTED AF'I$ FOR ~J-25 I$ 50-~329-20488-{)t. *** THE CORRECTED AF'I~ FOR ~6-9A ]~$ 5(D-O29-20558-OJ. STATE OF ALASKA ~ ~ ,, ~. ~ :! z ALASK/~ LAND GAS CONSERVATION Ct.. MISSION REPORT SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 780' FSL, 21' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 91' FNL, 67' FWL, Sec. 11, T10N, R15E, UM At effective depth 49' FSL, 96' FWL, Sec. 2, T10N, R15E, UM At total depth 62' FSL, 99' FWL, Sec. 2, T11N, R15E, UM 5. Type of Well Development Exploratory StratJgraphic Service RECEIVED Alaska Oil & Gas Cons. Commission Anchorage 6. Datum of elevation(DF or KB) 62 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-27 9. Permit number/approval number 84-62 10. APl number 50 - 029-21109 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 10825 feet Plugs(measured) 10458' MD; 8870' TVD true vertical 9223 feet Effective depth: measured 10458 feet true vertical 8870 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1850# Poleset 80' 80' Sudace 2373' 13-3/8" 2000 sx CS III & 400 sx CS II 2404' 2403' Production 10172' 9-5/8" 500 sx CI 'G' & 300 sx CS I 10203' 8623' Liner 924' 7" 340 sx CI 'G' 9893-10817' 8330-9220' Tieback Liner 6222' 7" 3668-9890' 3606-8327' Perforation depth: measured 10270-10282'; 10290-10318' true vertical 8689-8700'; 8708-8735' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 3632' MD; 4-1/2", 12.6/1, L-80, PCT @ 7497' MD; 3-1/2", 9.3#, L-80, PCT @ 9821' MD Packers and SSSV (type and measured depth) Baker FB-1 packer @ 9726' MD; 5-1/2", Camco Bal-0 SSSV @ 2257' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) see attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Shut in due to high watercut. 718 521 1026 Tubing Pressure 259 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE ~.~' DS 3-27 DESCRIPTION OF WORK COMPLETED CEMENT CAP PLUGBACK FOR WATER SHUT-OFF I/5/91: A CTU Cement Cap Placement for water shutoff was performed as follows: MIRU CT & PT equipment to 4000 psi. RIH w/CT & fluid packed wellbore w/seawater. Tagged bottom w/CT, then layed 7 bbls of expanding cement w/aggregate into wellbore to replugback (Sand/Cement Cap of 7/4/90 failed) over leaking squeezed perforations at: 10503 - 10518' MD (Z2) Ref. Log: BHCS 5/15/84. 10547 - 10569' MD (Z2) 10588 - 10602' MD (Z2) Displaced CT w/35 bbls of XCD Gel. Contaminated & jetted excess cement from WB. RD. I/7/9 1: MIRU & RIH to tagged bottom at 10458' MD. 3/1 5/91: Reperforated: 10270 - 10282' MD (Z4) 10290 - 10318' MD (Z4) Ref. Log: BHCS 5/15/84. Returned well to production and obtained a valid production test. RECEIVED MAR ~ B 199~ Alaska Oil & Gas 6ons. Oommission Anchorage ANCi4EiRAGE, ALA~-?KA £:,"A-f E ' 2--i -9i F.: E F E R i-- N C E ' ARCO CA~.:ED.~-Ini.~.~_._i-- FINAL.';':: .~ - '7' .,:::, "9 .-' 9--~ i!_,=... i 2 - ":._ :_' '2 i .6-~ 9 i 8-2.4 _,:,-~_o !:;..'i i;,~ 'i : i .... -i CCL ~ ... ".:' - '-:' ~':; -""--" ;:'.' F'ACKER COq'RELA'i-'~O~'~,, ~ i-..'~" ~,i 'i , ; ~ -... ,. ;., ; '4 ,,.., ~ -. ~ -25-'",-:'i ""'"' ':;'! iH -! ~ L..., :..,- i.. i., ,,., .. -~-~ --i 6-9i F,~".,~...'- ~ ,.:;;:,/r-, :[,-':' ........ R $'r 'i., :..,. .."--- ,-' f] F,' ff ;'.*. ,.-'., -':.- ~- '--' ;-'~ - 9 i F' ~,-'-.":, ~''' - ~ '::),'--;._. / ",-"~, '[ F F' . C ,n F.: F..' ~ ,~e ,.~" G H A i:i: U N 'i 9---':-,':;-9,'-"', F'E'-'!: ~.-r:c-n~::,r-, ~:'1 ~'--.~ -- + 'i - 3-":']' -':,';' ~ F'D K '-' ~ '-.'."-:, 6, / D :[ F F, C 0 F.: R. $ .T ~.5 iq A F..' U i'"-! i , ~-,,":'-i i--9 ~:, .,'--,,'-.,i ; ;:~;~,,.....,_,_, ,~, F'..bt,! i, -i -i .¥-9i c,~:: .... F F.'EF.'npi) ,,,_ .... , ~ :_p..- .... -,: r.;,I ii:.l i 2-'2E:,-9,:-} !:'i-'--.:ii-.'H RUN ~ , j {:;._. .... !::..-.. c;'~p~. P""-::.P.:~' ......... ,'..~_i:"c'F:r'~i:'ii_,,_=,'...~, ~:;.:Ui'"-! 'i , -:-'" ~ '; 5-- 9 ! !:' i'", k-' -~ .,":~ c., .," i'", .[ u-,._- f'- .,.'-~ ~:,, c,, -...'7 T [.; ~,~ A ;~' U ;-,i ~ .-'..:'A--S-"~ CL)L. LAF.: i;,'UN i: i--.~i 8--.9 ~ F'ERF' ORi;:';'i'~-~' ''~' ._,.: I ,-,, 1' ON/CCL I:,::Ui",i +~ -22-':;-::i F'DK-i 6,;3/DiFF,:/..:ORR, £iG,~-IA F:Or-..i 1 , _ AND RE:TURN ]"HE ~., l,.._.~l:.~ COPY RECEIf-"T OF' DA'f-A, DAY! HAVE A NIr'E. ,_, ZHAF:ON WiL30N ATO-i 529 AF' PIk:O V E L'~~ 'f i:;.: A,~'.,~ 5.' :; ? i ;?)'S (') · .'e THE API~ + INDICATES ,~,. ~ RTBiiTiON -,-'"'c-r:_ ~j,.,,..,,TRr.~L ~' ~ FILES ~ F'HiLL'rp~'., .. ~,--"'CHEVRON F'B WELL FILE,S' D & M Rc~.' D ~ EXTEN£-'I ON EXPLORATION ~- BF'X ~ EXXON -,--'-~TA'¥E-- OF~,..~.~"~ '~""~." A,, MARATHON TEXACO ~ MOBIL FOR .5-5 I£' 5,.':2-,:':)29-2,:;,2':2'2. THE DATE THI=' LOG WAS PRINTED, RECEIVED FEB 8 1991 Alaska 0il & Gas Cons. Dmmissio¢ Anchorage ARCO ALASKA, INC. ~. P.O. BOX i00360 ANCHORAGE, ALASKA 99514 DATE- t0-29-90 REFERENCE-' ARCO CASED HOLE FINAL~ 2-4 9-29-90 PRODUCTION PROFILE 2-i3 9-26-90 PITS 2-t4 9-28-90 F'RODUCTION PROFILE 3-27 9-27-90 SF'INNER/¥EMP 4-6 9-28-90 INJECTION PROFILE 4-i0 9-30-90 INJECTION PROFILE 6-20 y-29--90 LEAK DETECTION 7-23 t0-t-90 PIT$/HPFM 9-3 9-28-90 LEAK DETECTION 9-38 9-28-90 INJECTION PROFILE i3-28 9-27-9~ F'Rr~DU,~IS~}~OFILE SALLY HOFFECKER ATO-i_~29 RUN i , RUN i , RUN t , RUN i , RUN i , RUN i , RUN t , RUN i, RUN i, RUN t , RUN ~ , RUN ~, RECEIF:'T [;IF.' I)ATA~ AF'F'ROVED~"-'-'--' TRAN$~ 9f~4!3 · 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CENTRAl_ FZLE$ CHEVRON . D&M EXTEN~'ION~. . EXPLORATION EXXON MARATHON MOBIL. F'HILL1P~''~ F'B WELL F,' ~ D BPX STATE OF T-EXACO F' ]: I_ES ALASKA ARCO ALA:?KA, ZNC'~ P ,. 0. BOX i 6, ,:':':, 'S 6 ~.-} ANCi'iORAG[': ~ ALA:?KA ':? 9 ~j i DATE · 8--29-9(-} :,L., [..RENr':E ARco F'RE:?,f;I.iRE DATA S - 2 '7 '? ..- '? .-.-9 ,i -. :':) '.".:' ::~, -- ~:~ .... -'.':;." ,:':'~ .:::----2::';6 .... i 8...-9,:.:;, '~ .... S ;.-; 6 .... i ~ -..'::-:';:; · 'Y -~.- i ; :: 5: .... i ,::) i 2-22--:'-~9 i:.i::-2.7 i i -i 2--89 7 ..-. i <i:,6 .... 2,:.}- 9'-::) 9 '- S._., ~''- '7 ..- 2 ":"-:' -- '-':-'-' ;:', 9 '-. S 6 6 - 29 --' 96, i 6-'4 7- i -.96, i 6-6 6-22-9(') ! 6.--7 6--2'?"-9,.3, i 6 "- i 4 6-- 22 - 9 C:, i 6- i..~ '~ '?:-26-9,':;... W f:.; ]: -.. ':: ': -.- '::'~ ..- o ,-:., .. ,_-' -',, .~ ,',.j ... .,.. WE-:[-7 6-8-9':':) · .: i,"' T _.o .:.... o:.. 9C) BHF ....... £"¥AT :[ C E-RAD :[ ENT B i"i F: ........ :?;'"F A T i C G R A D ]: E. N"I- BHF ..... ,?TATiC GRADIENT B i"! F ....... :?-I" A '¥' :[ C G R A D ]: E N'i- 8 H F ..... :~ '? A ';:' :[ C (:; R A D :[ E N '¥ BHF ........ :%","' A T i,., '"' ,~-..-"" i:;'AI),, ]: E N-[.' BfiF'--,':~? T A T I C GRADIENT B H F: ....... :ii:'T' A 'i" :i: C (:.; R A D ]: E N 1" B 1"i F ....... ~-" T A 'i" i C (:; R A D I I_:-- N '¥ B i'! i:: ........ ,?; 'T' A T :i: C' (:; R A D ]: E N 'i" BI'iF ...... ~';'f'A"F :[ [2; C-RAD I ENT B H F ........ ~i: TA T :1: C' (:; I::.: A D ]: E N T BHF ..... ~-~'T'AT ]: C C:-RAD I FN'i- BHF ...... :?TAT lC GRADIENT BHF ....£-~'TAT ! CE-RADIENT Bt-It:: .... ::?1"AT i C: GRAD ]: E:N'i" [?,iai: ...... ~"'rAT Z C GRADIENT BHI:: ...... ::?'1"AT :1: C GRAD ]: [i. Ni- Bi"IF .... STATIC GRADiE:'NT BHF ...... ~i:i'AT I CGRADIE:NT C A ~'i C 0 C A ~"'~ C: 0 C ;::', i'~ C 0 C A f'l C 0 C ;:~ [-'~ C 0 C A i'! C: 0 C A M C 0 C A i,'! C 0 C A M C 0 C A i".'i C 0 C A H C 0 C A M C 0 C A H C 0 C A i"i C 0 C A ~'i C 0 C A i:i C 0 C A ii C L') C A ['.~ L: 0 F'LEA,":.."E :"ZIGN AND RE"I-UIN:N THE A'FTACHED COF'Y AY RECE]:P'F OF DA]A,. HAVF_" A NiCE DAY; S E P - 6 1990 :i:Ai..LY I-IOFF'ECK';:"'F.: ~aska OJJ & Gas Cons. ~,ommission A '¥ (:, - i ~ 2 9 An-nc-orage D I £'TR I BUT ]: ON CENTRAL FILES CFIEYRON · ,-D & M -:':i:XTIEN~'i ON EXPLORAT I ON ~. i::-,z X 0N HAF;:A THOi'q ~- HOBI_L F' F! I L L I F' F'B WELL F'II..I'Z~; R & D BF'X :~'i"ATE OF" ALA~:KA TEXACO ~ STATE OF ALASKA ALASKA' " AND GAS CONSERVATION O(, .vIISSION · REPORT uF SUNDRY WELL OPERATIONS Operations performed: Operation shutdown Stimulate Plugging Perforate X 2. Name of Operator ARCO Alaska, Inc. Pull tubing Alter casing ~ Repair well Other X 5. Type of Well Development Exploratory StratJgraphic Service 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 6. Datum of elevation(DF or KB) 62 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-27 9. Permit number/approval number 84-62/8-858 10. APl number 50 - 029-21109 4. Location of well at surface 780' FSL, 21' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 91' FNL, 67' FWL, Sec. 11, T10N, R15E, UM At effective depth 49' FSL, 96' FWL, Sec. 2, T10N, R15E, UM At total depth 62' FSL, 99' FWL, Sec. 2, T11N, R15E, UM 10825 feet 9223 feet Plugs(measured) 12. Present well condition summary Total depth: measured true vertical 11. Field/Pool Prudhoe Bay Oil Pool Effective depth: measured 10773 feet true vertical 9173 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1850# Poleset 80' 80' Surface 2373' 13-3/8" 2000 sx CS III & 400 sx CS II 2404' 2403' Production 10172' 9-5/8" 500 sx CI 'G' & 300 sx CS I 10203' 8623' Liner 924' 7" 340 sx CI 'G' 9893-10817' 8330-9220' Tieback Liner 6222' 7" 3668-9890' 3606-8327' Perforation depth: measured 10270-10282'; 10290-10318' true vertical 8689-8700'; 8708-8735' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 3632' MD; 4-1/2", 12.64t, L-80, PCT @ 7497' MD; 3-1/2", 9.3#, L-80, PCT @ 9821' MD Packers and SSSV (type and measured depth) Baker FB-1 packer @ 9726' MD; 5-.11~/2~,C,~,.~mco Bal-0 SSSV @ 2257' MD 13. Stimulation or cement squeeze summary I% I,,;, ~ ~ i ~ ~ ~ Intervals treated(measured) see attached AUG 0 7 ]990 Treatment description including volumes used and final pressure ,~a~ 0JJ .& Gas Coils, Representative Daily Averaqe Production or Injection Da~'''''v'~'~'' Oil-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 755 1209 5379 -- 360 684 937 4866 -- 526 14. 16. Status of well classification as: Oil x Gas Suspended Service Subsequent to operation Date 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 · .a~,.~ ii iq, ----. i ~_..!....__ SUBMIT IN DUPLICATE DS 3-27 DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE FOR WATER SHUT-OFF 1/8/89: MIRU CTU & Stimulation Equipment. PT CT. RIH w/CT and washed perforation intervals at: 10270 - 10282' MD Ref. Log: BHCS 5/15/84. 10290 - 10318' MD Pumped the following treatment: 71 bbls 12% HCl w/10% Xylene, followed by 71 bbls 12-3% HCI-HF, followed by 71 bbls 12% HCl. Flushed CT w/5 bbls Diesel & 67 bbls Meth Water. POOH. Rigged down. 1/15/89: A CTU Cement Squeeze was performed as follows: MIRU CT & Cementing Equipment. PT equipment to 4000 psi. RIH w/CT and fluid packed wellbore w/473 bbls of seawater. Pumped 48 bbls cement, squeezing perforations at: 10270 - 10282' MD Ref. Log: BHCS 5/15/84. 10290 - 10318' MD Placed 5 bbls of cement behind pipe at 1800 psi maximum squeeze pressure. Contaminated cement with 131 bbls of contaminant. POOH. Rigged down. 1/17/89: Performed clean out of contaminated cement from wellbore. 2/3/89: MIRU, and RIH to run Spinner. Log indicated squeeze failed. POOH. Rigged down. 8/14/89: MIRU CTU & Stimulation Equipment. PT to 4000 psi.. RIH w/CT and loaded wellbore w/168 bbls of crude, then pumped: 45 bbls 12% HCl, followed by 48 bbls 12-3% HCI-HF, followed by 44 bbls 12% HCl. Flushed w/35 bbls Diesel. POOH. Rigged down. 8/18/89: A CTU Cement Resqueeze was performed as follows: MIRU CT & Cementing Equipment. PT equipment to 4500 psi. RIH w/CT and fluid packed wellbore w/679 bbls of seawater. Pumped 47 bbls cement, resqueezing perforations at: 10270 - 10282' MD Ref. Log: BHCS 5/15/84. 10290 - 10318' MD Placed 8 bbls of cement behind pipe at 3000 psi maximum squeeze pressure. Contaminated cement. Cleaned out contaminated cement from wellbore. POOH. RD. 8/25/89: Reperforated: 10270 - 10282' MD 10290 - 10318' MD Ref. Log: BHCS 5/15/84. Returned well to production and obtained a valid well test. STATE OF ALASKA U ~ ]~.~ !~ ~ ~. ..~.-,-~.. ALASK,~,f'-'''~_ AND GAS CONSERVATION C( 'MISSION REPORT SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging ~ Perforate ~ Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 780' FSL, 21' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 91' FNL, 67' FWL, Sec. 11, T10N, R15E, UM At effective depth 49' FSL, 96' FWL, Sec. 2, T10N, R15E, UM At total depth 62' FSL, 99' FWL, Sec. 2, T11N, R15E, UM 5. Type of Well Development Exploratory StratJgraphic 6. Datum of elevation(DF or KB) 62 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-27 9. Permit number/approval number 84-62/90-324 10. APl number 50 - 029-21109 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 10825 feet true vertical 9223 feet Effective depth: measured 10773 feet true vertical 9173 feet Casing Length Size Conductor 80' 20" S u dace 2373' 13-3/8" Production 10172' 9-5/8" Liner 924' 7" Tieback Liner 6222' 7" Plugs(measured) Junk(measured) Cemented 1850# Poleset 2000 sx CS III & 400 sx CS II 500 sx CI 'G' & 300 sx CS I 340 sx CI 'G' Measured depth True vedicaldepth 80' 80' 2404' 2403' 10203' 8623' 9893-10817' 8330-9220' 3668-9890' 3606-8327' Perforation depth: measured 10270-10282'; 10290-10318' true vertical 8689-8700'; 8708-8735' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 3632' MD; 4-1/2", 12.6~, L-80, PCT @ 7497' MD; 3-1/2", 9.3#, L-80, PCT @ 9821' MD Packers and SSSV (type and measured depth) Baker FB-1 packer @ 9726' MD; 5-1/2", Camco Bal-0 SSSV @ 2257' MD 13. Stimulation or cement squeeze summary ~ 14. Intervals treated(measured) see attached Treatment description including volumes used and final pressure Prior to well operation Subsequent to operation ,AUG o 71990 AJaska 0H & Gas Cons. Commission Representative Daily Average Production or Injection Data /t~ch0rage OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure 240 2164 4261 -- 302 293 1239 2628 -- 414 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Date Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE DS 3-27 DESCRIPTION OF WORK COMPLETED SAND DUMP / CEMENT CAP FOR WATER SHUT-OFF 5/23/90: MIRU & RIH to pull SSSV, & tag bottom at 10,729' MD. RD. 6/22/90: A CTU Sand Placement was performed as follows: MIRU CT PT equipment to 4000 psi. RIH w/CT and fluid packed wellbore w/250 bbls of seawater, then pumped 48 bbls of Sand Slurry, followed by 19 bbls of XCD Gel Flush. Pumped 99 bbls of Meth Water. POOH. Rigged down. 6/23/90: MIRU, & RIH to tag bottom at 10,526' MD. Bottom two sets of squeezed perforations covered. POOH. RD. 6/24/90: MIRU, & RIH to tag top of sand at 10,503' MD. POOH. RD. 7/4/90: MIRU & RIH to bottom at 10,483' MD and pumped 0.4 bbl of cement on top 'of sand, followed by I bbl of bentonite contaminant. POOH. RD. 7/7/90: MIRU, & RIH to tag top of cement at 10,472' MD. POOH. RD. Returned well to production and obtained a valid production test. ARCO ALAS'KA, INC, F'~ O~ BOX ANCHORA(;E DATE' 6/i ~/9(-) REFE;RENCE' ARCO HA(~NETIC TAI::'E(~9) WITH 3-27 5-24-.-9(Z) CNi--D (S i:'AS,'£'E£') RUN ?, # ~C'~--./ JOB~:75888 6-2 5:-25-9e CNL (4 PA~'~'ES') RUN 6 ~~ 7S887 7-.!6 5..-24-9e CNL ~(S F'AZ~<jE~j) RUN 5 ~ ~~ '7S885 t ~ - ~ 6 5-28-90 CNL_O~; i8-i9 5--'2S-90 CNT-D (6 PASZEZ) RUN i ~~ ~ 73889 ~,~ C H 3'C'H 5'CH A-f'I..A~? 5'CH F'LEA£E ~;'IC~N AN.I) RETURN 1"HE ATI"ACHED COPY A,~.; RECEIPI" OF' DATA, RECEIVED BY ...... HAVE: A NICE DAY! S~ALL. Y f.IOFFECI(ER ATO-i 529 JUN 2 0 1990 .,,~'A' ~aska, Oil& Gas Cons, _{:;o.[~issiO~ AF:'F:'~O V~:~ .~..~..~. ............ , ~hO~ T F:A N S ~ 9 e 2 2 D 15'TR I BUT ]: ON CENT'RAL FILES, (CH) CHEVRON D & M 'I"AMMA,~f BROWN (OH) FXXON MARATHON MOBIL ARCi]J AL.A.?KA, INC~ P,.O. BOX i00~60 ANCHORAGE, ALA ~£KA 995i0 DATE' 6/7/9G REFERENCE' ARCO CASED HOLE FINAL£ F'WDWi-2 5-29-90 PWDWi-2 5-29-90 ~--~ 6-2-90 ~-2G 6-2-90 i-29 6-5-90 S-27 5-24-90 4--SS 5-i9-90 6-2 5-25-90 7-~6 ~ ~-~4-9~ ~ 2-~ 8 5-S0-9~ ~ 8-~ ? ~JQUEEZE F'ERF BRIDGE PLUG SETTING REC COMP NEUTRON G/R COMP NEUTRON G/F,' COMP NEUTRON G/R COMP NEUTRON F'OST INJ TEMF' COMP NEUTRON COMP NEUI'RON COLLAR COMF' NEUTRON COMP NEUTRON RUN t , ':'~'"_. RUN i, 5" RUN 'i ,5" RUN t , .,':'~" RUN t, ..-q' RUN i, 5" RLJN I , RUN ~'-,..,:'"" RUN t , 5' RUN I, 5' RUN t, 5" F'LEA£.'E ,~'IGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA, i' RECEIVED BY V ~ HAVE A NICE DAY! JUN 1 4 1990 SALLY HOFFECKER AI~sIG Oil & GasCons. Commi~io~ A T O- i 5 2 9 Anchorage AF'F'ROVE~ I'RANS~ 902tS ,?:; ('-: I-I ,"£ C H A'i L A,?.: A 'Fl..AS: A '1- L A ;:--'-' ZCH I"1F;:. 3': 3'CH $CH L I.t~. ~'CH ~ C IH DISTRIBUTION CENTRAL FILES CHEVRON - D & M EXTENSION EXPLORATION EXXON MARATHON MOBIL ~ PHILLIPS F'B WELL FILES R & D ~ BF'X · ~ ~'TATE OF ALASKA .l= TEXACO 1. Type of Request: STATE OF ALASKA ALAS'"-'OIL AND GAS CONSERVATION "--'"MMISSION APPLI(.,,. TION FOR SUNDRY APPROVALS 2. Name of Operator ARCO Alaska, Inc. Abandon ~ Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approv--~ program Pull tubing Vadance Perforate X Other 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 62" RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number DS 3-27 9. Permit number 84-62 10. APl number 50 - 029-21109 4. Location of well at surface 780' FSL, 21' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 91' FNL, 67' FWL, Sec. 11, T10N, R15E, UM At effective depth 49' FSL, 96' FWL, Sec. 2, T10N, R15E, UM At total depth 62' FSL, 99' FWL, Sec. 2, T11N, R15E, UM 12. Present well condition summary Total depth: measured 10925 feet true vertical 9223 feet Effective depth: measured 10773 feet true vertical 9173 feet Casing Length Size Sudace 80' 20" I nt e rmediate 2373' 13-3/8" Production 11. Field/Pool Prudhoe Bay Oil Pool Plugs(measured) RECEIVED j o 1 3990 Junk(measured) .;;~.l~.ska 0ii & Gas Cons. C0mmissi0r~ Cemented A~~ed depth True vertical depth 1850# Poleset 80' 80' 2000 sx CS III & 2404' 2403' 400 sx SC II 10203' 8623' 9893-10817' 3668-9890' 8330-9220' 3606-8327' 10172' 9-5/8" 500 sx Class G & 300 sx CS I 6222' 7- 340 Class G 7- t~ack measured 10270-10282'; 10290-10318' Liner 924' Perforation depth: true vertical 8689-8700'; 8708-8735' Tubing (size, grade, and measured depth) 5-1/2"/4-1/2"/3-1/2", L-80 tbg w/taill @ 9821' MD Packers and SSSV (type and measured depth) Baker FB-1 packer @ 9726' & Bal-0 SSSV @ 2257' MD Detailed operations program BOP sketch X 13. Attachments 15. Status of well classification as: Gas Suspended Senior Area Engineer Description summary of proposal X 14. Estimated date for commencing operation June 1990 16. If proposal was verbally approved Oil X Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~)(~ ~)', ..~i,'~% ' Title FOR COMMISSION H~I= ONLY ^ppr~,.%q!cm_ '_l~j~?r Re, turned ,, {Approval No. ~?)_../_/~, ~, Date SUBMI/T IN :I-RIPLICATE Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- ORIGINAL SIGNED BY LONNIE C. SMITH Approved by order of the Commissioner Form 10-403 Rev 06/15/88 DS 3-27 PROPOSED ADD-PERFORATIONS APl # 50-029-21109 PERMIT # 84-62 ARCO Alaska, Inc. proposes to perforate in the Upper Victor interval at DS 3-27 within the Sadlerochit Sand from the Prudhoe Bay Unit. The proposed perforation interval is as follows: Interva, I, MD Footaae. ft. SPF Zone 10460-10480 20 4 UV(2) Reference Log: CBL 5/18/84 Well 3-27 is a producer that is currently shut in. Wellbore fluids present when the perforations will be shot are oil, gas, and water. The expected bottom hole pressure is 3700 psi. All wireline work will be done through a 5000 psi WP BOP/lubricator, tested to 1.2 times the maximum expected surface pressure (diagram attached). 2 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WlRELINE RAMS CVARIABLE SIZE) 3. $000 PSI 4 1/6" L UBRI~I~TOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF NIRELINE BOP EOUIPMENT ... i i i i _ STATE OF ALASKA ALAS!~' OIL AND GAS CONSERVATION JMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend ... Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approved program Pull tubing Vadance Perforate Other , X. 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 62 RKB 7. Unit or Property Prudhoe Bay Unit 4. Location of well at surface 780' FSL, 21' FWL, Sec. 11, T10N, R15E, UM 'At top of productive interval 91' FNL, 67' FWL, Sec. 11, T10N, R15E, UM At effective depth 49' FSL, 96' FWL, Sec. 2, T10N, R15E, UM At total depth 62' FSL, 99' FWL, Sec. 2, T11N, R15E, UM 8. Well number 3-27 9. Permit number 84-62 10. APl number 50 - 029-21109 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10825 feet Plugs(measured) 9223 feet Effective depth: measured true vertical Casing Length Conductor 80' Surface 2373' Production 10172' Liner 924' Liner 6222' 10773 feet 9173 feet Junk(measured) Size Cemented Measured depth True vertical depth 20" 1850# Poleset 80' 80' 13-3/8" 2000 sx CS III & 400 sx CS II 2404' 2403' 9-5/8" 500 sx CI 'G' & 300 sx CS I 10203' 8623' 7" 340 CI 'G' 9893-10817' 8330-9220' 7' tieback ~ ~ C -~JV ~ i ~668-9890' 3606-8327' Perforation depth: measured 10270-10282'; 10290-10318' true vertical 8689-8700'; 8708-8735' Gas Cons° C0mmissi0rj ~nch0ra~ Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, POT@ 3632' MD; 4-1/2", 12.6#, L-80, PCT @ 7497' MD; 3-1/2", 9.3#, L-80, POT @ 9821' MD Packers and SSSV (type and measured depth) Baker FB-1 packer @ 9726' MD; 5-1/2", Camco Bal-0 SSSV @ 2257' MD 13. Attachments Description summary of proposal x Detailed operations program 14. Estimated date for commencing operation February 1990 16. If proposal was verbally approved Oil x Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~ Z'. ~ Title ~1~.. Signed (_./' FOR COMMISSION H.~I= ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test Location clearance Mechanical Integrity Test.. Subsequent form required 10- BOP sketch x 15. Status of well classification as: Gas . Suspended.. Date Approved by order of the Commissioner Form 10-403 Rev 06/15/88 0RIGIr,~; SiSNED BY LON,M,E' C. SM!TII [Approval No.¢~ .. OO~'J Commissioner Date SUBMIT IN TRIPLICATE Field Procedure 1. Perform a slickline tag to check PBTD. 2. Obtain a valid well test. 3. Load 3500 gals of 2% KC1 water with 140 lbs HEC gel. Allow HEC to hydrate for a minimum of 30 minutes. 4. Load 5600 lbs of 20/40 mesh sand, 700 lbs of 100 mesh sand, and 700 lbs silica flour. 5. MIRU CTU and pump equipment. 6. Install 2" nozzle with a large open end diameter on the CT for placing the sand. 7. RIH with CT to 15' above PBTD. Liquid pack the PT/CT annulus with seawater. 8. Batch mix the 3500 gal of 2% KC1 water (with 140~ HEC gel) with 5600 lbs of 20/40 mesh sand, 700 lbs of 100 mesh sand, and 700 lbs silica flour, for a total volume of about 91 bbls. Note' I gal 15% HCI/Mgal should be added to the gel/sand slurry immediately prior to pumping the slurry down the CT to break the HEC gel. 9. In order to keep from stringing the sand up into the tubing, pump the sand slurry in three 30 bbl stages, tagging PBTD after each 30 bbl stage. Take returns from the PT/CT annulus while pumping the sand slurry. Pull up with the CT as slurry is displaced into the wellbore to avoid sticking the CT. While displacing, do not exceed 1500 psi wellhead pressure or i BPM. 10. Pull nozzle above tubing tail and let sand settle for 1 hour. Tag top of sand. Sand top should be at approximately 10490' MD (10500'-10480' is acceptable). 11. POOH w/CT. RD. 12. RU slickline and tag sand top to verify CT tag. 13. Adjust sand top to within 10500'-10480' if necessary. 14. RU two 10' sections of the 2" E-line dump bailer (capacity is about 2 gal/run). 15. Batch mix 5 gals of BJ Services' acid soluble cement. Load dump bailer with 2 gal cement. 16. RIH with dump bailer and tag PBTD. Dump cement. 17. Repeat step 16. 18. POOH w/EL. RD. 19. After 4 days, tag PBTD with slickline and bring well on. 6 5 2 C0~LE'D TUBINI~ UNITI BOP E01U I PMENT 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE: 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PS1 4 1/6" SHEAR 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 2 WIRELINE BOP EOUIPHENT 1. 5'000 PS, I '7" WELLHEAD OONNECIOR FLANGE 2. 5'000 PS;I WIR[LINE RAMS, (VARIABLE SIZE) 3. 5'000 PSI 4 1/6" LUBRICATOR 4. 5,000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO ALAS'KA, INC. F'.O. BOX t0036~, ANCHORAGE, ALAS'KA 995t0 DATE: 4-6-90 REFERENCE' ARCO CASED HOLE FINALS t -32 3-2O 3-27 -/'-8 7-i7 7-2i i3-6 14-32 i4-33 ~6-t9 3-t9-90 F'RODUCTION F'ROFILE 3-t5-90 PRODUCTION PROFILE 3-t4-90 F'RODUCTION F'ROFILE 3-t9-90 - PRODUCTION PROFILE 3-t8-90 3-t6-90 LEAK DETECTION PRODUCTION PROFILE INJECTION F'ROFILE/PIT$ GAS LIFT SURVEY LEAK DETECTION LEAK DETECTION RUN RUN RUN RUN t, 5' RUN RUN RUN RUN RUN RUN PLEASE SIGN 'AND RETURN THE ATTACHED COF'Y AS RECEIF'T OF' DATA. RECEIVED BY HAVE A NICE REEEIVED SALLY HOFFECKER ATO-t 529 APR 1 t 1990 Alaska 0il & Gas (Ions, Co--ri ~chom~ AF'F'ROVED ~ DISTRIBUTION CENTRAL FILES CHEVRON D & M ' EXTENSION EXPLORATION EXXON MARATHON MOBIL PHILLIPS PB WELL FILES R& D BF'X STATE OF ALASKA TEXACO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO ARCO ALASKA, INC. F'.O BOX i00360 ANCHORAGE, ALASKA '995i 0 DATE' it-27-89 REFERENCE' ARCO CASED HOLE FINALS ~i-34 i0-t4-89 PRODUCTION PROFILE d -oG i0-25-89 GAMMA DSN -27 8-26-89 F'ERF RECORD f5-i ti-9-89 COLLAR/PERF/F'ACKER ~ 5-27 t~-4-89 CBT ~6-3 1t-2-89 FH TEMF' /~/,~7t4 1t-3-89 PRODUCTION PROFILE · -TA t0-25-89 PRODUCTION PROFILE ~7-i7 i0-25-89 PRODUCTION PROFILE ~'~7-2G tt-6-89 PRODUCTION PROFILE /~,'-27 ii-4-89 INJECTION PROFILE ~,-28 tt-3-89 FLITS ~?-29 ii-4-89 PITS /7-30 ii=5-89 PITS 7-S3 ii-5-89 INJECTION PROFILE/TEMF' _ ~'9-9 tO-27-89 PRODUCTION F'ROFILE ~ 9-ii i~-28-89 LEAK DETECTION 9-28 te-30-89 TEMP/GR . 9-38 ii-5-89 F'ERF RECORD · ~- ii-5 9-2-89 F'ERF RECORD ~-~i-5 t~-27-89 PRODUCTION PROFILE/LEAK · *~--~i '2-t t i 0-28-89 LEAK DETECTION ....~_~o ~i i ~-27-89 CCL/TEMF' ~2-S7 t ~-'26-89 INJECTION PROFILE ~i 4-4 i i -6-89 COLLAR/PERF ~---i5-i3 ii-7-89 TUBING CUTTER 45-i$ i~-28-89 TEMF' ~45-2~ ii-4-89 CNL //i7-4 9-8-89 F'ERF RECORD' DEl' RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN .RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN PLEASE SIGN AND RET THE ATTACHED HAVE A NICE DAY! NOV $ 019 SALLY HOFFECKER A T O- i 529 Nas Oil & Gas Cons. CometssWn ~chomge COPY AZ RECEIPT OF DATA. TRANS~ J394'66 -. DISTRIBUTION CENTRAL FILES CHEVRON D&M EXTENSION EXPLORATION EXXON MARATHON MOBIL PHILLIPS F'B WELL FILES R & D BPX STATE OF ALASKA I'EXACO CAMCO HLS HLS AFLAY SCI-I CAMCO CAMCO CAi"qCO CAMCO CAMCO CAHC?'~ H I;,' S HR$ HR$ CAMCO CAMCO CAMCO CAMCO SCH Hi_~ CAMCO CAMCO CAMCO C A M C (3 ATLAZ ATLAS CAMCO HL3 THE CORRECTED AF'I$ FOR it-5 If 50-029-20670. ARCO ALASKA, INC. F'.O. BOX iu;~u~¢~A'~ ANCI4ORAGE, ALASKA 995i DATE· t ~-8-89 ° REFERENCE' ARCO CASED HOLE FINALS i6-24 8-7-89 F'ERF RECORD F'ERF RECORD D~N (2 i/8') DSN (3 3/8') DSN (S 5/8') PERF RECORD F'ERF RECORD F'ERF RECORD F'ERF RECORD RUN RUN RUN RUN RUN i RUN~ i&2, 5" RUN i RUN RUN PLEASE ~7IGN AND RETURN THE ATTACHED COF'Y AS- RECEIPT OF DATA. RECEIVED BY _ HAVE A NICE DAY! SALLY HOFFECKER Al'O-i ~."~o.,.., APPROVED _~_ DISTRIBUTION ~ CENTRAL FILE~ CHEVRON - D & M "' EXTENSION EXPLORATION " EXXON MARA-I'HON ~ MOBIL ~ F'H ILLIF'.S' F'B WELL FILES R & D ' '""'BF'X · "' STATE OF ALASKA · " TEXACO HL£' I--I L ::7 HL.~.' i.-iL*''~ HL.:g' HL,? I-IL. ~: t--IL:~ FILS ARCO ALASKA, INC, F';O. BOX ANCHORAGE, ALASKA DATE- REFERENCE- 2-t0-89 _ ARCO CASED HOLE FINALS t -t 9 t -5-89 i -29 t -8-89 3-2£:, t.-~--8-88 3-22 i 2-8-88 3-27 t 2-3i -88 S-27 2-3-89 °-3~' i '--'-i .°-8° i i -i i 2-S-89 COLLAF.:/F'ISRF COLLAR/F'ERF F'DK/CNL OVERLAY PDK/CNL OVERLAY PDK/CNL OVERLAY SPiNNER/TEMP PDK/CNL OVERLAY PDK/CNL OYF.'RLAY LEAl< DETECTION RUN RUN t,...,""" RUN i , 5" RUN i, 5," RUN i , 5" RUNx~ i -5 ~: RUN. . i, _,:="" RUb.! i , PUN.. i , _,"':" F'I_EAS.'E SIGN AND RETURN THE ATTACHED COPY A£ RECEIF'I' OF DATA. G E Al.;.'. HL~' A'f'L. AZ ATLAS.: A'f'L. AL: OT !~'~ R '/' L. A ~..-'.' A--i-- i_ A i..~ o'r ! 3' RECEIVED BY - HAVE A NICE DAY! V SALLY HOFFECI<ER AT0-i529 TRAN~ ~,9 - APPROVED Oil & ;.ia:. O0n;. Commission Anchorage DISTRIBUTION CEN'FRAL FILE~ CHEVROi'-~. D & M EXTENSION EXPLORAi-ION EXXON HARATHON MOBIl_ PHILLIPS F'B WELL FILES' R & D S£AF'C ~'TATE OF ALA£'I<A TEXACO ARCO ALASKA, INC. F'.O. BOX t00360 ANCHORAGE, ALASKA REFERENCE' ARCO CASED HOLE FINALS ~-23 ~-&-89 COLLAR/PERF RUN 3-2& ~2-3t-88 PERF RECORD RUN 3-2? ~2-~-88 F'DK-~00 RUN t, 5" ** ?-33 ~-4-89 TEMF' SURVEY RUN 9-5 t2-30-88 PFC RUN ~4-39 t-5-89 PFC RUN ~4-39 t-?-89 PRODUCTION PACKER RUN ~, 5' ~4-40 t2-29-88 CBT RUN t4-40 t-4-89 GAMMA RAY RUN ~'LEASE SIGN ANDRETURN THE ATTACHED COPY AS RECEIF'T OF DATA. .......... RECEIVED BY SALLY HOFFECKER AT0-t529 TRANS ~89~ APPROVED ______ DISTRIBUTION A'¥LA~' $CH ATLA3' $CH ATLA3' Al'LA&' ATLAS ATLAS CENTRAL FILES CHEVRON D&M EXTENSION EXF'LORATION EXXON MARATHON MOBIL PHILLIPS F'B WELL FILES R & D SAF'C ~TATE OF ALASKA TEXACO ** THE CORRECTED AF'I$ FOR THIS LOG I$ 50-029-218~9. ARCO ALASKA, INC· P~O~ BOX ~(~6~ ANCHORAGE, ALASKA ~9~,, DATE' t-t7-89 REEF"EERENC~:E: ARCO MAGNET IC '¥AF:'IES W/L.I SI'I NG ..- ~.S t -~ t -89 CH F'DK-t ~'.J (S F'A2$) & GR ..JtJE',r,~6 ?.S ~-.27 t2-~t-88 CH' F'I)K-t(.)O (S F:'A2S) & BASE GR ,.JC)B~:S66(:~ f"LEASE 2IGN AND RE"I"URN i'HIE ATTACHED COF'Y AS RIT. CEIPI" OF' DATA, HAVE n NI . . .?ALLY HC)I::'F'FZCK ER ~asl~il & Oa~ Cons. C.ommisslon ATO- t 529 ' APPROVED .]~. .... D I $ l' R I B U 1' I 0 N A I'I..A$ ATL. A$ CENTRAl_ FILES (CH) CHEVRC]N D & M 'TAMMAS BROWN (C)l-.l) EXXON iqARAI'HON MOBIL · ~ F'H I1_1.. I F'S F'B I~EI..I_ F'IL. ES R & D ~ SAF:'C STA'I'F OF' ALASKA I'EXACO ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager November 15, 1988 C. V. "Chat" Chatterton Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-27 Permit No. 84-62 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/JLB/jp At t a chme n t cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 3-27)W1-3 RECEIVED NOV 1 7 1988 Alaska 0il & Gas Cons. Commission Anchorage WELLS3/78 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C ~ STATE OF ALASKA AL. ~AOILANDGASCONSERVATIONCOMMi, ,ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend __ Alter casing I Repair well I Change approved program __ 2. Name of Operator 8, Address Operation shutdown i Re-enter suspended well __ Plugging __ Time extension ! Stimulate ! Pull tubing __ Variance I Perforate __ Other v/ 5. Type of Well: ~'-"'h Development(~=:,/ Exploratory __ Stratigraphic I 6. Datum elevation (DF or KB) 62' 7. Unit or Property name P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 780' FSL, 21' FWL Sec. 11 T10N, R15E, UM At top of productive interval ' 91' FNL, 67' FWL, Sec. 11, T10N, R15E, UM At effective depth 49' FSL, 96' FWL, Sec. 2, T10N, R15E, UM At total depth 62' FSL, 99' FWL, Sec. 2, TllN, R15E, UM Service __ Prudhoe Bay Unit 8. Wellnumber DS 3-27 9. Permit number 84-62 10. APl number 50-- 029-21109 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10825 feet Plugs(measured) 9223 feet Effective depth: measured true vertical 10773 feet Junk (measured) 9173 feet Casing ~ngth Surface 80' Intermediate 2373' Production 10172' Liner 924' 6222' Pedorationdepth: measured 10270-10282'; 10290-10318' truevertical 8689-8700'; 8708-8735' ~bing(size, gmde, and measuredde~h) 5½"/4~"/3½", L-80 tbg w/tail Size Cemen~d Measureddepth 20" 1850# Poleset 80' 13-3/8" 2000 sx CS III & 2404' 400 sx CS II 9-5/8" 500 sx Class G & 10203' 300 sx CS I 7" 340 Class G 9893-10817' 7" tieback 3668-9890' @ 9821' MD PackersandSSSV(typeandmeasureddepth) Baker FB-1 packer @ 9726' & Bal-0 SSSV @ 2257' MD ~uevedicaldepth 80' 2403' 8623' 8330-9220' 3606-8327' RECEIVED NOV 1 7 1988 Alaska Oil & Gas Cons. C0mmissI0r~ : ~ ~ch0rage 13. Attachments Description summary of proposal ~ Detailed operations program ! BOP sketch v" 14. Estimated date for commencing operation November 1988 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oi~ Gas I Suspended serVice 17. ! hereby cj~rtify that the for~goinpg is true and correct to the best of my knowledge. Signed ,,~¢~'/'~//~vr~ Title Operations Engineering Manager Date FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity / BOP Test __ Location clearance ! Mechanical Integrity Test __ Subsequent form required 10- Approved by order of the Commissioner ORIGINAL SIGNED BY LONNIE C. SMITH App,'oved Copy Returned Commissioner IAppr°val N°' Date Form 10-403 Rev 06/15/88 WELLS3/78 J. L. Brady, 263-4245 SUBMIT IN TRIPLICATE DS 3-27 Coiled Tubing Unit Cement Squeeze Procedure AFE #797961 1. RIH with CT. Perform a full strength mud acid wash on the perforations from 10224'- 10602' MD. Flow well to produce out all the acid. 2. Surge the well with the slickline surge tool set in the tubing tail. Make a slickline tag run and do a fill cleanout if needed. 3. RIH with CT. Fluid pack the tubing with f'fltered water. 4. Pump 60 bbls of cement followed by 2 bbls of water and 140 bbls of contaminant. Hold 1500 psi surface squeeze pressure for 60 minutes. Squeeze off the following perforations: Zone Pefforatons SPF (Ref.' BHCS 5-15-84) 4 10224'-10270' FSD 4 10270'-10282' FSD 4 10290'-10318' FSD 3 10350'-10360' FSD 3 10450'-10460' FSD 2 10503'-10518' FSD 2 10547'-10569' LSD 2 10588'-10602' LSD Squeezed on 4/88 Reperfed on 4/88 Reperfed on 4/88 Shot / Squeezed on 4/88 Shot/Squeezed on 4/88 Squeezed on 4/88 Squeezed on 4/88 Squeezed on 4/88 5. Jet or reverse out the contaminated cement~ 6. Perforate as follows: Zone Perforations SPF (Ref.' BHCS 5-15-84) 4 10270'-10282' FSD 4 10290'- 10318 FSD Other Well Information: Current status: On production. Expected static bottomhole pressure: 3800 psi. @ 8800' SS Expected fluid in wellbore at reperforation: seawater. 6 5 4 2 C01LED TUBING UNIT BOP EOU ! PHENT 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. :~)00 PSI 4 1/6" ,~'IEAR RAMS 5. 5000 PS1 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX RECEIVED NOV 1 7 1988 ~t~s .ka,_ 0ii & Gas Cons. ~: '_Anchorage 2 HIRELINE BOP EOUIPHENT _ I. 5000 PSI ?" WELLHr..AD CONN£CIOR IrLANO£ 2. 5OD0 PSI WIR£LIN£ RAMS (VARIABLE 3. 5000 PSI 4 1/6" LUEIRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO AL.A~'KA, INC, "~---, P,~O· BOX iO0;56e ANCHORAGE, ALAS;KA 995i¢ QATE: 9-S8-88 RFFERENCE' ARCO CA~'ED HOI_E FINALS t "8 9-~ ~3-88 INJECTION PF;:OFIL. E -~0 9-26-88 PERF RECORD -22 9-27-88 A~ENQHENT TO ACBL. OF 5'-'~8-82 -'~'~ ~- 2 :~"- 88 F'F C :~- ~ ~-' ~ -88 PRODUCi' I ON F'ROF I L.E 3-4 9-S-88 INJECI-ION PROFILE S .... 20 9-2-88 PRODUC'f'ION F:'ROF:'IL.E ~-22 9-t '"88 F'RODUCTION PROFILE ~-"27 9-2-88 PRC)DUCT I ON PROF'I L.E 5-'S 9'-'¢-88 F:'RODUCTION PROFII_E ~'"5 9-9-88 F:'RODUCT I ON F'ROFI L.E 6-t 4 9-4-88 PITY 7-"~ S 9-2S-88 COLL. AR/F'ERF' 9-9 9'-S-88 F'RODUCI' ION PROFILE t 5-' 9 9- 5-' 88 PR 0 D U C I' I 0 N P R 0 F' I L E .... P 0 ~' T - ~' l' i M, i 5-i eA 9-2i-88 VERTILOG t 5-"i CA 9-2t -88 HAGNELOG t5-i2 9-i4-88 F:'RODUCTION F'ROFILE i 5""i 5 9-'3-'88 F'RODUCI'ION F:'ROF'ILE i5-t9 9-2¢-88 COMI::'LETZON RECORD i 5-25 9'-'2S-88 COL[.AR i6-4 9-2-'88 GAHMA RAY t 7-4 9-t 0-88 PITS t 8-i 9-t t -88 F;'I l'~' I::'I_EA,S'E ~'IGN AND RE'¥URN '¥1--I~'C-[{t~ED)F"r' AS RECEIF:'T HAVE A NICE DAY! ,'_'...'AL.I_Y HOFF:'FCK ER ATO- t 529 /\!:;:Aa Oil & Gas Cons. t;ummission AF'PROv~.u ........... L~ .............................................. D l £' fir i 8U T I ON RLJN i , 5 · R(JN I , 5" RtJN t, 5" RLJN t, .5 · RUN i , 5" RLJN t , 5' RUN I , 5" RIJN t, 5' RUN t , 5" RUN t , 5" RUN ~ , 5 ' RUN 2, 5' RON ~ , 5" RUN ~ , 5' RLJN i , 5" RUN t, '5' RON t , 5' RtJN I , 5 ' RLJN i, 5" I'", i' .,' ,J RtJN t , 5' RUN t, 5' OF DATA, CAMCO $CH ~. A 'l' t. A .9 A'I'I.. AiF,,,,,~ CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO C A M C; 0 CAMCO A'I'LA~' CAMCO CAMCO AI'LA;~ A 'f'L A,~' CAMCO CAMCO SCH ATL. A~' CAMCO C A ~ ;C: O CAMCO CAMCO ~" CENl F.AL. F'ILE~9 · "' Ci4EVRON ~ . I) & M EX'FENSZON EXl-':'LORAT I ON '"' FXXON MARATHON $ MOB I L. ¢r F:' I"11 I_ L I F:' $ F'B WELl.. F'iLIE,S' R & D ~ :~AF'C ~ ,.~'I"A'TE OF' ALASKA · ," I'EXACO F'I. Fi~,?!:!' ,%71'gN ¢'zN1-) g:l!r'f'!!!:;,'N TFIF- P,'T'T~f't. HF']') c. rlt::,Y ¢;5.' I:;: i::' f": IF 'r F-:"T' f'~l::' l) ]] ,~ T i:;: T. P,t IT T ~' fT;.F..NI'F.'~I... F'T.. I''~' -". 'g: g 7,"T' E' K! E~' 1; O N F .¥. F' I.. _t71 F: ,'~ '¥ ]' .f.i N · ~,. .... Fj ¢~ lq.-' ¢.-~ T H I.-.] N · "- f.t f..1. P, T I · ~_- . .... STATE Of ALASKA ..~ ~ ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Classification of Service Well 1. Status of Well OIL [~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-62 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21109 4. Location of well at surface 9. Unit or Lease Name 780' FSL, 21' FWL, Sec.11, T10N, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 91' FNL, 67' FWL, Sec.ll, TION, R15E, UM 3-27 At Total Depth 11. Field and Pool 62' FSL, 99' FWL, Sec.2, T10N; R15E; UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool RKB 62'I ADL 28328 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 5/02/84 5/15/84 5/21/84* N/A feet MS L 1 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD} 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 10825'MD/9223'TVD 10773'MD/9173'TVD YES [~ NO [] 2257' feet MDI 1900' (approxl 22. Type Electric or Other Logs Run D I L/BHCS/GR/SP, LDT/CNL/GR/Cal ~ CNL/GR~ CBL/GR/CCL, Gyro, Verti 1 og: CBT/CET; GR/CCL/Temp. 1 og 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91,5# H-40 Surf ~tO' .BO" 1R50 # Pnl. eset 13-3/8" 72.0# L-80 Surf 2/¢0b,' 17-1/?" ?000 _~ CS _ ! ! & ~_00 s× CS !! 9-5/8" 47.0# L-80 Surf 1020B' 12-1/z;" ~Or) _~× r.]~ G ~ 300 s,, CS ! 7" 29.0# L-80 9893' 10817' 8-1/2" B40 sx Class G 7" ti ebacl 29.0# N-80/L-80 3668' 9890' 8-1/2" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5~"/4~z"/3~z" 9822 ' 9726 ' 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED Perfs f/10224'-10360 70 bbls 15% HC1 & 125 sx Class G None open to Production Leak f/9778'-9788' 500 sx Class G Perfs f/10048'-10773 48 bbls 15% HC1 & 150 sx Class G 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) 8/2/85 F1 owl ng Date of Test Hours Tested PRODUCTION FOR OI L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO 8/23/85 4.0 TEST PERIOD I~ 449 366 342° 55° 815 Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 343 -- 24_HOUR RATE I~ 2695 2195 2051 ---- 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None 1~,,,C~b,,'~ * NOTE: Perforated well 8/2/85. Workover performed and perforations squeezed (~0~. and stimulated 4/23/88. .l~ · . (Dani ) TEMP3/WC102 Form 10-407 Submit in duplicate t/~/ Rev. 7-1-80 CONTINUED ON REVERSE SIDE ~.~ ............. ~ME /. ' ....................................... Include inte~al t~ted, pressure' data, all fluids recover~ and graviw, ~ ;: .' c.: -:~. MEAS~ D~'~ TRUE VERT. DEPTH GOR, and time of each phase. '" ' ' . - .~:: .- .. . _ . .... . . . ...... ...... Top 5ad]erochit · 10222~ 86~1~ N/A G~ -. ~.-. . ~ ~:~';1930~~ 8720~ :-',.., ~- ~': , , [. ' ........... : ', . . . . HOT 10597 ~ - 9003 ~ - ' ;:1:0627~ 90~2' -. .':-.' · . , , ;:.:~:;: ' ~ ..'. 0WC ':' 10679~ 9082.6' : . Base Sad]e~oc~it ~ ~.. ~.. -1'0711~ 9113~ ~,' ~'. :' ~ i ,_ ..... .. . ~. ~ ..' ~ . ~ ' ~ ,;; ",,,. :,., . ·. ' ,r : . . .- ,. , ,. . , ,.~: ', ~ . ... , . . 31. LIST OF ATTACHMENTS None 32. I hereby ce~ify that the foregoing: is'trbe and-Corr~t to th'e best of m~ knowledge ~ ' " INSTRUCTIONS · General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classifica:tion of Service .Hells: Gas injection, water injection, steam injection, air. injection, salt water disposal, water.supply fo_r iajection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (Where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.). Item 23: Attache~i s~upplemen, tal records for this well should show the details of any multiple stage cement- ing and the location' o~ tl~e~cementing tool. Item,.~,2.7.:' MethOd ~' "' . of OPeration: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jectiOn,Gas I.nj~c;tion, Sl~-in,Dther-exp!ain. .. Item 28: If no cor~hken, ~iCate "none". Form 10-407 ANCHORAGE, ALASKA 995 ~ ~ DATE' 4-~ 9-7,(7, t '7--. 7:' i 40-.4 Z. 4.-'z-q° 17FII ' A~:/PF,q'F¢IR'AT T' ON 4- ..-'P ~-R R CMl. 4'-?-R,q I-:.fll t_ ARiF"F'RF'I3R'ATTRN- 4- 4'-F4R I-:. fl !_ ! -' --~-,=' o~'~ ROll ¢.~R/F'F'RF'FiI:;:AT'rf'IN! 4 - '-':-~ '::'; - F', :::: C.N i - fC I;: .-'.% -- 2 :,':' - f~ ¢~ Cf'l! 4- '?'-'?.--fAiR i-:f'!! !.. ¢'~F..,:/I:'FrI:;:!:I-IF~:¢'~T T fi,N; 4 -- .?'::--;'- R fq r:flt I ¢, F;: / F' F:' R' F" ri F: ,,:~ T T .FI N · :~-- .'7-' %- R)~ f":l-!t i A !;: / P F rq F' Fl, F,: A T T l"li'J 4---,.'g.- R R Pr=r'.i.. 4- o..' -- R,'-'~ I-:Ri F:'I. [-:." ¢',,Q F .:.c' -r., CN ~NT~ FTI. lr-;'N,.,. R' F ?. F T ',,!..F.. DRY I--IAYE A MICE 'F'E .F, CY ATO-~ 5...-'2. TRAN ..... APPROVED D~Y~ R'IlN R'IIN E'I!N 171 I:~ot IN !.71 i'...~ !:~' ! I;:1 i'-.J R'I i"-J I;.'1 i',J F;: i i".~ 171 DI£TRIRIITTON CENTRal... FII...E~ FXTFN~TON F%Pt. ORATTRN E¥¥RN MARATHON MOBIl._ -"- PH T I...I.. T. P,~ ~ . PFL WFI. I._ FTI. F.~' R & D .. .. TEXACrl ARCO ALASKA, P~ O~ BOX ANCHORAGE ~ AI_A~KA ~-~ ~-~-RR VF~TTI.N~ R! IN '~ · .5" RIIN i . ~.T .?, 'r r,: ;;RI iTTON D & H ~X~ON HARATHRN _ F'HTI..I..~P~ F'R W~I..I. FTIFZ ~T~TF OF ~-" STATE OF ALASKA ALASi OIL AND GAS CONSERVATION COMN. .,SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~J Stimulate ~ Plugging [] Perforate ~ Pull tubing WORKOVER Alter Casing ~ Other~ 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 7801 FSL, 211 FWL, 5ec.11, TION, R15E, UM At top of productive interval 911 FNL, 67! FWL, 5ec.11, TION, ELSE, UM At effective depth 49' FSL, 96' FWL, Sec. 2, TION, ELSE, UM At total depth 62' FSL, 99' FWL~ Sec. 2¢ TION~ R15E¢ UM 11. Present well condition summary Total depth: measured 10825'MD true vertical 9223'TVD Effective depth: measured 10773 'MD true vertical 9173 'TVD feet feet feet feet Plugs (measured) Junk (measured) 5. Datum elevation (DF or KB) RKB §2' 6. Unit or Property name Prudhoe Bay Unit 7. Well number 3-27 8. Approval number ~-167 9. APl number 50-- o29-211o9 10. Pool Feet Prudhoe Bay Oil Pool None None Casing Length Size Conductor 80 ' 20" Surface 2373 ' 13-3/8" Producti on 10172 ' Liner 924 ' 6222' Perforation depth: measured 9-5/8" 7!1 7" tieback Cemented 1850# Poleset 2000 sx CS III & 400 sx CS II 500 sx Class G & 300 sx CS I 340 sx Class G None open to production Measured depth 80'MD 2404 'MD 10203'MD 9893 ' -10817 ' MD 3668'-9890'MD True Vertical depth 80 ' TVD 2403 ' TVD 8623 'TVD 8330'-9220'TVD 3606'-8327'TVD true vertical None open to production Tubing (size, grade and measured depth) 5-1/2"/4-1/2"/3-1/2", L-80 tbg w/tail ~ 9822' Packers and SSSV (type and measured depth) FB-1 pkr ~ 9726' & Bal-O SSSV 8 2257' 12. Stimulation or cement squeeze summary 13. Intervals treated (measured) :'" .... '" ~.,,..' ~'; ',i.:-~; ',.¢¢~;. C0i~,rrlF;;:;~,.~?? Perfs f/10224'-10360', leak f/9778'-9788'; perfs f/10048'-10773' ......... ~r~r.:~¢~:~r~ ' Treatment description including volumes used and final pressure 70 bbls 15% HCl & 125 sx Class G~ 500 sx Class G~ 48 bbls 15% HCL & 150 sx Class G Representative Daily Average Production or Iniection Data N/A OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 14. Attachments (Workover We~l History) Daily Report of Well Operations ~ Copies of Logs and Surveys Run ~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Form 10-404 Rev. 12-1-85 Title Associate Engineer Date (Dani) SW03/74 Submit in Duplicate ARCO Oil and Gas Company Daily Well History-Final Report Instructione: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable lenglh of time. On workovers when an official test ie hot required upon completion, report completion and representative test data in blocks provided. The "Final Repel1" form may be used for reporting the entire operation if space is available. I Accounting cost center code District I State ARCO Alaska, Inc. I AK Field ?RUDXOE BAY FIELD Auth. or W.O. no. AS2149 Operator ARCO Spudded or W.O. begun ACCEPT Date and depth as of 8:00 a.m. 04/23/88 TD:10825 ?B:10773 SUPV:CD ICounty or Parish NORTH SLO?E - ?RUDHOE BAY Lease or Unit ADL: 28328 Title WORKOVER DS 3-2~well no. API: 50-029-21109 A.R.Co. W.I. rrotal number of wells (active or inactive) on this, Icost center prior to plugging and 1 22,0000 Jabandonment of this well Date ]Hour ]Prior status if · W.O. 03/29/88 / ~2oo .Rs I Complete record for each da,/, reported POOL 102 RELEASED RIG MW: 8.5 SEAWATER CONTINUED RIH WITH 5-1/2"/4-1/2"/3-1/2" COMPLETION ASSY WITH TAIL @ 9822', SSSV @ 2257', PKR @ 9726'. SPACED OUT. DISPLACE WITH DIESEL & TESTED TUBING TO 3000 PSI - OK. SET BPV. ND BOPE. NU TREE & TESTED TO 5000 PSI. SECURED WELL AND RELEASED RIG @ 0600 HRS, 4/23/88. DAILY:S304,054 CUM:$1,439,547 ETD:S1,439,547 EFC:$1,000,000 Old TD Released rig Classifications (oil, gas, etc.) INew TO J PB Depth Date ]Kind of rig I Type completion (single, dual, etc.) Producing method Official reservoir name(s) Potential tesl data Well no. Date Reservoir Producing Interval Oil or gasTest time Produclion Oil on lest ,Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravily Allowable Effective date corrected The above is correct For form preparation/~d distribution, see Procedures Man~t~, Section 10, Drilling, Pages 86 add 8?. Ae~3<~IATE ENGINEER AR3B-459-3-C Number ell daily well history forme consecutively as they are prepared for each well. iPage no. DIvIMMI M AttM'itl~RIGIdlMdCompM1y ARCO Oil and Gas Company Daily Well History--Interim Inllruclionl: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work perlormed. Number all drill stem tests sequentially. Attach description of ali cores. Work performed by Producing Section will be reported on "lntlrllw" sheets until final completion. Report official or representative test on "Flnll" form. 1) Submit "lnllrll~" sheets when lilled out but not less frequently Ihen avery 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly lot workovers and following setting of oil string until comple[ion, District ICounty or Parish IState ARCO Alaska, Inc. I NORTH SLOPE - PRUDHOE BAY I AK Field JLease or Unit IWell no. PRUDHOE BAY FIELD I DS 3-27 Date and deptl~ Complete record for each day while drilling or workover in progress as of 8:00 a.m. POOL 102 04/17/88 ( 1 TD:10825 PB:10773 SUPV:RO 04/18/88 ( 2 TD:10825 PB:10773 SUPV:RO 04/19/88 ( 2 TD:10825 PB:10773 SUPV:RO 04/20/88 ( 2 TD:10825 PB:10773 SUPV:RO 04/21/88 ( 2: TD:10825 PB:10773 SUPV:CD 04/22/88 ( 2~ TD:10825 PB:10773 SUPV:CD The above is correct Signature For form preparation and/~lstribution see Procedures Manualj~__~l=tion 10, Drilling, Pages 86 and SE,/ REV CIRC HEC PILL MW: 8.5 SEAWATER DRLD CMT F/ 10050' TO 10067'. POOH W/ MILL. MU 6" BIT AND TIH. DRLD CMT F/ 10067' TO 10370'. REV CIRC HEC PILL. DAILY:S25,864 CUM:$938,356 ETD:S938,356 EFC:$1,000,000 POOH F/ SQUEEZE MW: 8.5 SEAWATER REV CIRC HEC PILL. TEST PERFS TO 1400 PSI. WORK STUCK PIPE LOOSE. POOH. CHNG BIT , BHA AND TIH. DRLD CMT AND EZSV AT 10380'. TIH W/ PIPE IN DERRICK TO 10649'. DRLD JUNK AND FILL TO 10773'. CIRC HEC PILL. TEST PERFS TO 1000 PSI. BLEED OFF TO 700 PSI IN 5 MINS. POH FOR SQUEEZE. DAILY:S25,618 CUM:$963,974 ETD:S963,974 EFC:$1,000,000 BATCH MIX CEMENT MW: 8.5 SEAWATER FINISH POOH. PU 2-7/8" TUBING. TIH WITH 3-1/2" DP. CIRC HEC PILL. PUMP ACID. DISPLACE WITH 80 BBLS OF SEAWATER. FORMATION LOCKED UP. PUMP 24 BBLS 15% HCL ACID. DISPLACE WITH 80 BBLS OF SEAWATER. FORMATION LOCKED UP. REV CIRC HEC PILL. PUMP 24 BBLS 15% HCL ACID. DISPLACE ACROSS PERFS. FLUSH WITH 80 BBLS OF SEAWATER. FORMATION LOCKED UP. TRY TO GET INJECTION RATE. BATCH MIX CEMENT. DAILY:S27,607 CUM:$991,581 ETD:S991,581 EFC:$1,000,000 CIRC HEC PILL MW: 8.5 SEAWATER BATCH MIX 150 SX OF CLASS 'G' CEMENT AND SPOT BALANCE PLUG. POOH WITH 17 STDS. CLOSE ANNULUS AND SQUEEZE. NOT ABLE TO GET ANY CEMENT AWAY. HOLD FOR 1 HR. REVERSE OUT. NO CEMENT RETURNS. POOH. MU 6" BIT BHA AND TIH. TAG CEMENT @ 9775' BREAK CIRC. TEST PERF 1000 PSI. LD 34 JTS OF DP. RIH WITH PIPE IN DERRICK. DRILL CEMENT FROM 9775-10773'. CIRC HEC PILL @ 10773'. DAILY:S72,856 CUM:$1,064,437 ETD:S1,064,437 EFC:$1,000,000 POOH LDDP MW: 8.5 SEAWATER REVERSE CIRCULATE. TEST CASING TO 1000 PSI. DISPLACE HOLE WITH SEAWATER TREATED WITH C-193 CORROSION INHIBITOR. POOH. RIH WITH 6" GR/JB. MU 7" BAKER FB-1 PACKER AND 3-1/2" TAILPIPE. TIH TO 9715'. DROP BALL. PRESSURE UP TO 1500 PSI AND SET PACKER @ 9715'. TEST PACKER AND CASING TO 2500 PSI FOR 30 MINUTES. POOH. LD 3-1/2" DRILL PIPE. DAILY:S45,129 CUM:$1,109,566 ETD:S1,109,566 EFC:$1,000,000 RIH WITH 5-1/2" COMPLETION ASSY MW: 8.5 SEAWATER CONTINUE POOH LDDP. PULL WEAR BUSHING. CHANGE OUT LEAKING 3" VALVE ON TUBING SPOOL. LOAD PIPE SHED WITH TUBING AND STRAP. MU SEAL ASSEMBLY. RIH WITH 3-1/2" 8RD AB-MOD, 4-1/2" FL4S, .... 5 ~'~" ?~ ~ ..... CC~PLETiC~: '"' ~'"~ 5 1,2'" DAL $ ~, ..... IDate ITitle · 5'-4-~5~5 ASSOCIATE ENGINEER AR3B-459-2-B INumber all daily well hislory forms conseculively as Ihay are prepared for each well. IPage no. ARCO Oil and Gas Company ~, Daily Well History--interim Inst~ctions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formalion name in describing work performed. Number all drit~, stem tests sequent st y. Attach descr ption of a I cores WOrK performed by Producin(~ Section will be reported on "Interim" sheafs unlil final completion- Report oHicial or representative test On "Final' form. 1} Subm t Interim" sheets when f led out but not ess requen ly than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly lot workovers and Iollowing setting el oil string until completion. District ICou.ty or Parish IState ARCO Alaska, Inc. J NORTH SLOPE - PRUDHOE BAY J AK Field ILeaie°runit Iwelln°' PRUDHOE BAY FIELD I DS 3-27 Data and depth as of 8:00 a.m. 04/11/88 TD:10825 PB:10773 SUPV:CD 04/12/88 TD:10825 PB:10773 SUPV:CD 04/13/88 ( 1 TD:10825 PB:10773 SUPV:CD 04/14/88 ( 1 TD:10825 PB:10773 SUPV:CD 04/15/88 ( 1' TD:10825 PB:10773 SUPV:CD 04/16/88 ( 18 TD:10825 PB:10773 SUPV:RO Complete record for each day whila drilling or workover in progress POOL 102 POOH MW: 8.5 SEAWATER SLIP NEW DRILLING LINE. TIH. TAGGED FISH @ 9810'. SCREWED INTO HALLIBURTON CHAMP PKR @ 9810'. POOH. LD PKR. MU 7" EZSV. TIH. REPAIRED RIG. FINISHED TIH. SET EZSV @ 9798'. ATTEMPTED TO CIRCULATE BOTTOMS UP. 9-5/8" X 7" PACKED OFF. POOH. DAILY:S37,084 CUM:$652,077 ETD:S652,077 EFC:$1,000,000 PUMP HEC SWEEP MW: 8.5 SEAWATER POOH. MU BHA. RIH. CDL. FINISH TIH. DRLD EZSV AT 9789'. POOH. MU HOWCO CHAMP PACKER. RIH. SET PACKER AT 3690'. CIRC DOWN DP 5 BBL/MIN AT 500 PSI. PUMP HI-VIS SWEEP. DAILY:S54,609 CUM:$706,686 ETD:S706,686 EFC:$1,000,000 TIH W/ 7" EZSV MW: 8.5 SEAWATER PUMP HEC PILL. RIH 1 STD. PUMP PAINT TRACER. POOH. PU RTTS. RIH. SET PKR AT 3686'. CIRC 5 BBL/MIN. PUMP HEC PILL. TIH W/ RTTS TO 9941'. TEST 7 "TO 2500 PSI. GOOD. POOH. TESTING 7". ISOLATE LEAK AT 9778' TO 9788'. CIRC HEC PILL AT 9778'. POOH. PU 7" EZSV. RIH. DAILY:S31,300 CUM:$737,986 ETD:S737,986 EFC:$1,000,000 NU TBG SPOOL MW: 8.5 SEAWATER TIH AND SET EZSV AT 9635'. CIRC. CMT W/ 500 SXS CL "G" CMT. CIP AT 12:20 HRS, 4/13/88. CIRC. POOH. RU DRESSER ATLAS. RIH W/ GR/CCL/TEMP LOG F/ 9400' TO 3600'. RD DRESSER. RIH W/ BHA AND RTTS. ND BOPE'S, TBG SPOOL. INSTALL NEW SPOOL. DAILY:S89,036 CUM:$827,022 ETD:S827,022 EFC:$1,000,000 TIH W/ BIT MW: 8.5 SEAWATER CHANGE OUT TBG SPOOL AND NU BOPE'S. TEST SPOOL AND BOPE'S TO 5000 PSI. PACKOFF TO 5000 PSI. INSTALL WEAR BUSHING. sTING INTO RTTS. TEST CSG TO 2500 PSI. POOH. MU DRESS MILL. TIH. DRESSOUT SLEEVE AT 3668'. POOH. MU CPH AND SEAL STEM. TIH. TEST SEALS. POOH W/ CPH AND SEAL. REDRESS SEALS. TIH. TEST SEALS AND CSG TO 2500 PSI. SET CPH. POOH. MU BIT AND BHA. TIH TO EZSV AT 9635'. DAILY:S50,304 CUM:$877,326 ETD:S877,326 EFC:$1,000,000 DRL CMT MW: 8.5 SEAWATER RIH. DRLD EZSV AND CMT TO 10045'. REVERSE CIRC. TEST CSG TO 2500 PSI. OK. POOH. MU MILL AND TIH. CUT DRL LINE. TIH TO 10043' DRL CMT. DAILY:S35,166 CUM:$912,492 ETD:S912,492 EFC:$1,000,000 The above ia correct Signature Data [Ti,,. ASSOCIATE ENGINEER For term preparation and/~istribution see Procedures Manual~ction 10, Drilling, Pages 86 and AR3B-459-2-B Number all daily well hislory forms conseculively as they are prepared for each well. Page no, ARCO Oil and ~as Company Daily Well History--Interim Instruclione: This form is used during drilling or workover operations. If testing, coring, or perfOrating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "lnterla" sheele until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less Irecluenlly than every 30 days. or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District ICountyorParish ISlale ARCO Alaska, Inc. NORTH SLOPE - PRUDHOE BAY [ AK Field Lease or Unit PRUDHOE BAY FIELD DS 3-27 well no. Date and depth as of 8:0~ a.m. 04/05/88 ( TD:10825 PB:10773 SUPV:RWO 04/06/88 ( TD:10825 PB:10773 SUPV:RWO 04/07/88 ( TD:10825 PB:10773 SUPV:CD 04/08/88 ( TD:1'0825 PB:10773 SUPV:CD 04/09/88 ( TD:10825 PB:10773 SUPV:CD 04/10/88 ( TD:10825 PB:10773 SUPV:CD Complete record for each day while drilling or workover in progress POOL 102 8) 2) CIRC. HEC PILL MW: 8.5 SEAWATER TESTED 9-5/8" CASING. FOUND LEAK @ 5086' (APPROX). POOH. SLM. RU DRESSER. RIH WITH 5.9" GR/JB TO 10623'. RIH & SET 7" EZSV @ 10380'. CHANGE RUBBERS ON 3-1/2" RAMS. MU RTTS ASSY & TIH. STING INTO EZSV. ESTABLISH INJ. RATE. UNSTING. TESTED 9-5/8" CASING - UNSUCCESSFUL. ATTEMPTED TO STING INTO EZSV. HAD 8' FILL. MIXED AND PUMPED HEC PILL. DAILY:S47,791 CUM:$296,237 ETD:S296,237 EFC:$1,000,000 RUN CBT/CET MW: 8.5 SEAWATER CIRCULATE HEC PILL. POOH & LAY DOWN RTTS. LD DC'S. SLIP DRILL LINE. MU BAKER MILL & TIH TO TOL. POLISH OUT LINER TOP. POOH. RU SOS & RUN CBT/CET FROM 9889' TO SURFACE. DAILY:S57,451 CUM:$353,688 ETD:S353,688 EFC:$1,000,000 PU 5" DP, TIH W/LINER MW: 8.5 SEAWATER RAN CET F/9889'-SURFACE. CHANGED RAMS TO 5" & 7". RU & RUN 192 JTS 7", 29~, N-80/L-80, LTC, AB-MOD, LINER F/3668'-9890'. LOAD PIPE SHED WITH 5" DP. STEAMED & STRAPPED. RIH WITH LINER PICKING UP 5" DP. DAILY:S138,775 CUM:$492,463 ETD:S492,463 EFC:$1,000,000 TIH W/6" BIT MW: 8.5 SEAWATER TIH WITH 5" DP. STING INTO TIEBACK SLEEVE @ 9889'. UNABLE TO UNSTING DUE TO RIG LIMITED PU. WAITED ON ORDERS. BULLHEAD EP MUD LUBE DOWN THE 9-5/8" X 7" ANNULUS. WORK PIPE. SET LINER HANGER @ 3668'. POOH. LD 5" DP. TIH W/6" BIT FOR CLEAN OUT TO EZSV @ 10380'. DAILY:S33,383 CUM:$525,846 ETD:S525,846 EFC:$1,000,O00 EST. INJ. RATE W/ACID MW: 8.5 SEAWATER CONTINUED TIH. CLEANED OUT TO 10380' EZSV. REVERSE CIRC. POOH. CHANGED RAMS. MU 7" EZSV. TIH. SET EZSV @ 10080' DPM. ESTABLISHED INJECTION RATE .3 BBL/MIN 1400 PSI. SPOTTED 35 BBLS ACID 15% HCl. ESTABLISHED INJECTION W/ ACID. DAILY:S29,533 CUM:$555,379 ETD:S555,379 EFC:$1,000,000 SLIP NEW DRILLING LINE MW: 8.5 SEAWATER INJECT 35 BBLS 15% HCL ACID. CMTD W/125 SX CLASS G. SQUEEZED 14 BBLS INTO FORMATION 10224'- 10360'. REVERSE CIRC. 10 BBLS CMT OUT. POOH. MU 7" HOWCO CHAMP PKR. TIH. ISOLATE HOLE IN 7" @ TIEBACK STEM. POOH. LEFT CHAMP PKR IN HOLE. SLIP NEW DRILLING LINE ON DRUM. DAILY:S59,614 CUM:$614,993 ETD:S614,993 EFC:$1,000,000 The above is correct For form preparation and distriJ~tion see Procedures Manual Section/10, Drilling, Pages 86 and 87 ',/ I Title 5'-~-~9~ ASSOCIATE ENGINEER AR3B-459-2-B INumber ali daily well hislory Iorms conseculively as lhey are prepared for each well. IPage no. ARCO Oil a,,d Gas Company Well History - Initial Report- Daily Inllrdctlonl: Prepare and submit the "lnlllll RipelT' on the first Wednesday after a well il spudded or workover operltlonl itl Itlrlld. Dally work prior to Spudding should be summarized on the form giving inCiUliva dates only. District 1 County. parish or borough I State ~q. CO Alaska, Inc. I NORTH SLOPE - PRUDHOE BAY I AK Field ]Lease or Unit IWell .o. PRUDHOE BAY FIET.D I ADT.: 28328 DS 3-27I AU~. or W.O. no. I~ltle ' AS2149 ~ WORKO~R APl: 50-029-21109 Operator IARCO W.I. ARCO I 22.0000 I Spudded or W.O. bagunACCEPT IDate 03/29/88 IH°ur 1200 }']RS IPri°rstalulifew'O' Data and depth aa of 8:00 e.m. 03/30/88 ( TD': PB:10773 03/31/88 ( TD:10825 PB:10773 SUPV:RWO 04/01/88 ( TD:10825 PB:10773 SUPV:RWO 04/02/88 ( TD:10825 PB:10773 SUPV:RWO 04/03/88 ( TD:10825 PB:10773 SUPV:RWO 04/04/88 ( TD:10825 PB:10773 SUPV:RWO . The above is correct Complete record for each day reported POOL 102 PULLED BPV - FILLED HOLE MW: 8.5 SEAWATER ACCEPTED RIG @ 1200 HRS, 3/29/88. RU LINES TO KILL WELL. PULLED BPV. KILLED WELL WITH SEAWATER. MONITORED WELL. SET BPV. ND 5-1/2" TREE. NU BOPE. CHANGED BOTTOM RAMS TO BLINDS. PULLED BPV. FILLED HOLE. DAILY:S57,964 CUM:$57,964 ETD:S57,964 EFC:$1,000,000 LD 5-1/2" TUBING MW: 8.5 SEAWATER TESTED BOPE TO 5000 PSI - OK. PU ON TUBING HANGER. CIRCULATE. MONITORED WELL. MIXED AND PUMPED HEC PILL. LD 5-1/2" TUBING. CHANGED RAMS F/5-1/2" TO 3-1/2". MU TRI-STATE TOOLS & BHA; TIH. LATCHED ONTO FISH AND PULLED FREE. LD 5-1/2" TUBING. DAILY:S28,286 CUM:$86,250 ETD:S86,250 EFC:$1,000,000 TIH W/ FHL RET TOOL MW: 8.5 SEAWATER LD 5-1/2" TUBING. TIH WITH OVERSHOT AND 3-1/2" DP. LATCH ONTO FISH @ 6723'. JAR AND WORK FISH LOOSE. POOH WITH FISH. LAY DOWN 5-1/2" TUBING AND ASSEMBLY. RD TBG TOOLS. LOAD PIPE SHED WITH DP. MU BAKER FHL RET TOOL BHA AND TIH. DAILY:S25,449 CUM:$111,699 ETD:S111,699 EFC:$1,000,000 TIH WITH SCRAPPER MW: 8.5 SEAWATER PU 3 -/2" DP. TIH TO 9807'. LATCH INTO PRR. WORK PBR LOOSE. CIRC HEC PTLL. POOH WITH PKR. LAY DOWN SINGLES WIT}.] KELLY. POOH LD PACKER AND TAIL PIPE ASSEMLBY. MU BHA AND TIH TO 9889'. DAILY:S25,433 CUM:$137,132 ETD:S137,132 EFC:$1,000,000 CUT AND SLIP DRLG LINE MW: 8.5 SEAWATER CIRC HEC PILL. POOH. RU DDA. RIH WITH JB/GR 8.5. RIH WITH VERTILOG. RIH WITH PERF GUN. TAG UP @ 9960'. CUT AND SLIP DRILLING LINE. DAILY:S37,368 CUM:$174,500 ETD:S174,500 EFC:$1,000,000 TEST 9-5/8" CASING MW: 8.5 SEAWATER TIH WITH 6" BIT AND BHA. TAG BRIDGE @ 10042'. WASH TO PBTD @ 10773'. CIRC HEC PILL. POOH. RU DA. RIH WIH PERF GUN. PERF FROM 10450'-10460', 10350'-10360'. RD DA. RU RTTS AND RIH AND TEST 9-5/8" CASING. DAILY:S73,946 CUM:$248,446 ETD:S248,446 EFC:$1,000,000 Signature For form preparation aP/~/distribution, see Procedures MenuaF$ection 10, Drilling, Pagea 86 and 87. Date I Title 5-4'~ ASSOCIATE ENQINEE~ AR3B-459-1-D Number all daily well hlltory forml consecutively aa they ere preplred for each well. Page no. ARCO ALASKA, INC~ P,O, BOX ~¢8S&0 ANCHORAGE, ALASKA REFERENCE: ARCO CA.~ED I..IOI..E F'];NAI... "~,' -; ~ ~* 4-6-8.8 ..,.BT aLi PF.. LOC, ~z~-,. t 9 4-9-8~ CBT 4-4 9 4-9-88 CF.'I- t ~.~. -. I t 5-27--88 F.'F' '"r'.., 'i 8-~ ? "z----,o-Ro F'FF: · . ;..~ ,,..% i,.,.i !.. I.,; ... !::'I...EA,~F.'.: ,~ I Gig AND DATA.. .?CH S'CH ATI...AS' A'¥L. AS' R E. (....-IF.. :1: V' F' O 'flY H A VIZ A N I C 1::' I-i: G G Y BENi A'l'O- ~ .529 TRAN,~ ~882S6 Z~ APPROVE.D Oil & G~s r.~.~ Gommissio~ A.qchor~ge D I S~ T R ]: B 1..! 'T' :t: 0 N -"-..~CENTRAl.. :,~ [.'. H .F.': V R [) N ~.,,. EXTENS'ION E'Y. F'L.OF~A T ]: ON_.., ~"~. EXXON MARATHON ~' i"tO~ .T. ! ~ .... F:' t..I i[ !... 1... :1: F'.~ F'R WELl... F'T.I...F.S' ~ .~AF'C ~ S'TATF...". r..1F' AI...AS'ICA · '" TF:XAC. O STATE OF ALASKA ALAS,.., OIL AND GAS CONSERVATION COM~. ~SlON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend [] Operation Shutdown ~.' Re-enter suspended well [] Alter casing ~ Time extension ~ Change approved program ~ Plugging [] Stimulate ,/~.~ Pull tubing~. Amend order [] Perforate ~ Other~,,~ 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 780' FSL, 21' FWL, Sec.11, T10N, ELSE, UN At top of productive interval 91 ' FNL, 67 ' At effective depth 49' FSL, 96' At total depth 62' FSL, 99' 11. Present well condition summary Total depth: measured true vertical FWL, Sec~11, TION, R15E, UM FWL, Sec. 2, TION, R15E, UM FWL, Sec. 2, TION~ R15E~ UM 1 0825 ' MD feet Plugs (measured) 9223 '-TVD feet 5. Datum elevation (DF or KB) RKB 62 ' feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 3-27 8. Permit number 9. APl number 50-- 029-2110~) 10. Pool Prudhoe Bay 0ii Pool None Effective depth: measured . 1 0773 'MD true vertical 91 73 ' TVD Casing Length Size Conductor 80 ' 20" Surface 2373 ' 1 3-3/8" P roducti on 1 01 72 ' 9-5/8" Liner 924 ' 7" feet Junk (measured) None feet Cemented Measured depth Rue Verticaldepth 1850# Poleset 80'MD 80'TVD 2000 sx CS 111 & 2404'MD 2403'TVD 400 sx CS II 500 sx Class G & 10203'MD 8623'TVD 300 sx CS I 340 sx Class O 9893'-10817'MD 8330'-9220'TVD Perforation depth: measured 10224'-10282,, 10 10547'-10569,, 10 true vertical 8643 ' -8699 ', 8707 8955'-8976', 8995 Tubing (size, grade and measured depth) 5-1/2", 17#/ft, L-80, AB-Mod tubing w/tail ~ 9931' Packers and SSSV (type and measured depth) FHL pkr (~ 9855', Otis ROM sssv ~ 7173' 12.Attachments 290'-10318' 588'-10602' '-8734', 8913'-8927' '-9007' Description summary of proposal ,~ Detailed operations program [] BOP sketch 13. Estimated date for commencing operation March 26, 1988 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed (~~~. Title Asso¢ial;~ Fpgin~.~.r Commission Use Only (JG) Date SA3/69 Conditions of approval Approved by ORIGINAL SIGNED BY LONNIE C. SMITH Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Approved Copy Returned ~ ~ ~ - ,;~ [ ~ , . Commissioner Approval No. by order of ,..~ ,~?~-) the commission Date,---~- /'£?--~. : Form 10-403 Rev 12785 Submit in triplicate PBU DS 3-27 PROCEDURE SUMMARY OBJECTIVE: Retrieve the existing 5-1/2" leaking tubing and remove the packer assembly. Acidize and squeeze the entire perforated interval. Run a vertilog casing inspection log in the 9-5/8" casing. Tieback the 7" liner to cover existing 9-5/8" casing leaks up to 6750'MD. Clean out the 7" to PBTD then complete with a 5-1/2" LTC-Mod x 4-1/2" FL4S tubing with GLMs and a permanent packer. The well will be feperforated after the rig moves off. 1) MIRU WWI. Circulate seawater to kill well. 2) Set BPV. NU, ND, test, pull BPV. 3) Pull and LD 5-1/2" tubing. 4) Retrieve PBR seal assembly. 5) Retrieve PBR and K-anchor. 6) Mill and recover SAB packer. 7) RIH w/9-5/8" test packer and locate leak. 8) Shoot squeeze perfs. 9) Acid wash and cement squeeze interval. 10) Run vertilog casing inspection log. 11) RIH w/7" casing and tieback liner to +6750' with liner hanger and a CPH liner top packer. 12) RIH w/8-1/2" bit and clean out to new T.O.L. 13) Test casing to 2500 psi. 14) RIH w/6" bit and clean out to PBTD and test squeeze to 1000 15) RIH w/7" packer and 4-1/2" FL4S x 5-1/2" LTC-Mod tubing with ELMs. 16) Test tubing to 3000 psi and annulus to 2500 psi. 17) Set BPV. ND BOPE. NU tree and test. 18) Release rig. Anticipated bottomhole pressure: 3850 psi Workover fluid: 8.5 ppg seawater LWK/24 3/7/88 ANNULAR PREVENTER PIPE RAMS 5 BLIND RAMS TUBING HEAD 1. 13-3/8" CASING HEAD 2. 9-5/8" CASING HEAD 3. 5000 PSi TUBING HEAD 4. !3-5/8" - 5000 PSI BLIND RAMS ~ 1%_~/~,,. 5000 PSi PIPE PAM~ 6. 13-5/8" - 5000 PSI ANNULAR ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT iN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO ~ . =.JO PSI AND HOLD FOR 10 MINUTES 5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. I ,"' , C -.. ' 7. ,H..REA..E PRESSURE TO ~x-~,3 PS~ AHD HOLD FOR I0 MINUTES. -I ~ ~ 8. C. LO~,E VALVE~ u~RECTLY uPSTREAM OF CHOKES. BLEED DOWNSTREAM P~ESSURE TO~OPSi~OT~c, TVALVES. TEST~EHAINING UNTESTED HANIFOLD VALVES, ~F ANY. WiTH 5000 PSI UPST~EA~ OF VALVE AND WiTH ZERO PSI DOWNSTR'E 'r~ CT N . ~ :. BLEED SY~,E,, TO ZERO PSI 9. OPEN PiPE RAMS. 5AC~:.OF~ ~gNNiNG JTAND PULL OUTOFHOLE. ~ e,~ B~ ,~,n ~..~.,~- ~.~ ~c:~,, ..... 50'.)0 PSI FOR ~0 id~HLI," ' m~c~ BLEED TO ZERO PSi. 10. OPEN bL' ~n ~ ' '~'~ _ ~" ~-,~ ~:A~ ~:, AND RECOVEE'. TEST PLUG. MAKE SUrE MANIFOLD LINES APE ~' i '"'-'~ ~uL~ OF ARCTIC D~L AND ALL VALVES ARE SET IN THE DRI ~ ~'~ PO I i. TEST STANDPIPE VALVES TC, 5000 PSI. 12. TEST KELLY ce""~"c'~.~.~,.. ~ AHD I~'~S'nr~_ Be')P_ TO 5000 PSi WITH KOOMEY PUMP i3 RECORD T:'~ iNFORMATION . _ ~ _,,~ ~'LOWOOT PREVENTER TEST FORM. AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BO~E DAILY. JG NOVEMBER 21, 1986 ARCO Almskm, Inc F'·O· Box t00360 Anchormge, Almska 995i0 DATE: Augus't ~t, t98'7. REFERENCE: ARCO Cased I-to J~ F'j'/la J. t-29 8--8-87 -Prod. F'rofi Le i-30 8-9-87 F'rod. F'rofi le i--3t 8-9-87 Prod, F'rofi Le t-32 8-t~-87 Prod, F'rofi Le i-33 8-9-87 F'rod, F'rofi Le 3-9 8-t 6-87 l'emp, Log 3-t,. ~ 8-8-87 In j, F'rofi le 3-t8 8-6-87 Inj. F'rofi le :~-27 8- i 6-87 F'r od. F'r o f i l e 3-38 8-i0-87 GR/l'emp/F'rod. Profile S'urvey 4-3 8-i6-87 Prod. F'rofi le 4-6 7/~t--8/t/87 Leak Def./Temp/Flowme~er 4-2? 8-8.-87 Inj. Profi le/Temp~/f:'lowmeker 4-~2 8-t~-87 Prod. F'rofi le 5--2 8/t-..2/87 Leak Dek/Temp. Log 'Z-2~ 8-t 2-87 F lowmef er ?--t 8-t7-87 X-Y CaLiper 9--~ 8-t~-87- F'rod. F'rofi le 9-8 8-7-87 Inj. F'rofi le/Temp./Flo~me~er ~-t8 8-7-87 Inj. F'rofi le/Temp./Flowmefer 9..-~t '7-':2~-87 F'rod. F:'rofi Le t.~'~ ---=~'~ 8-5-87 Inj . .Prof i l~_ Run Run t , 5" Run t , 5" Run Run t, 5" Run ~, 5" Run ~, 5" Run ~ , 5" Run ~, 5' Run t, 5" Run Run ~, 5' Run Run ~, 2' Run Run Run Run t, Run Run t, Run ~ , 5" & 5" &5" I."-'l. ea.se sign and return khe a~kached copy a.s rec:eip~ of da , F;:oxa nne ~ek ~ka Oil ~ / ~ ~ / ~.cn0mgo -- Ap p rov ~,~cl Y.~ ...... C 8 ffl C 0 C a fm~ .iT:. 0 C8 m~ 0 Ca mc o Camco Camco C a mc: o Ca m~ o Ca nIC o C a m c o Camco C ~ fm)C 0 Ca JllC 0 Ce co Ca mc o Ca~o Camco Camco Ca mc o .,~: Central Fi Les :,": I::'hi l. lip · "' C':hevrc',n F'B We I. l F'i les !) & H F;.'.,.-.'" I) ~-.- E x 'J' e n x J o n E .x p I. o r a t i o n ~ S' o h i o -"- E'xxon :~: State of Alasl<a M a r a 't h o n ..- 'l" e x a c o · "' Hob i [ 'W ARCO Alaska, Inc. ......... p. 0 ~.- B-~-x -. t (~60.~ Anchorage, Alaska :.' '- .... t? 7 ........................................ . _ , . ~. ,,~ ~ . :~ REFERENCE :' AR~.O.:~Pre~Ure Da'fa t-29 8-t7-87 ~,i:~ k ~ic G adien~ Camco ~-3~ 8-t 7-87 ~afic Grad ienf Camco t-3t 8-t 7-87 ~'ka~ ic Grad ienk Camco 3-7 8-t9-8'? Memory F're~.s/Temp,(P,F,O,) 3-2T 8-t7-87 Flowing Gradien~ Camco 3-38 8-t8-87 Flowing Gradienf Camco 4-t 8-t~-87 FLowing Gradien~ Camco 4-3 8-t~-87 Flowing Gradienf Camco 9-t 8-t3-87 FLowing Gradien~ Camco F'lea_~e .sign and return ~ ~_tf~ct~c~..,py a.s-~ipf of dafa. HAVE A NI CE~~i=~ 0il & Gas Oon~ Ro~anne f:'e~ ' .... ~~8 .. ATO- 'rRAN$ ~87443 ,.~ Al:) p roved ............ - D I ~: T R I B U T I 0 N F;," ii'-F E F,: E N C E ·,',~ R C 0 Oil a Gas Cons. Commission Anchorage C: h ~'-'.:, v '.." c.', ',."',- i!!: x i' e'n :i~. i (:) 'n """ L o',:" a ~' ' · · [:. ;':. i;:' ,. I (:.:, i": 12' :... X X (3 ~"i a '.," a -i: h ,:::, n .i'-"i c:, b i. ARCO Alaska, Inc. P~O. Bo× J00:360 Anchormge, Alaska 995 ~ 0 DATE' November t4, t985 REFERENCE: ARCO Cased Hole Finals DS 3-7 9-8-85 DS 3-'~7-- 9-2-85 CCL/F'er f Record Run t 5' ~ch EPL Run t 5" $ch F'[ease sign and Received By__ HAVE A NICE DAY! Kelly McFar[and ATO-t 429F TRAN~. $435 return the attached copy as receipt of data. DISTRI'BUTION ......... ': Ch eYr on D & M ExpLoration Service~ Ex'l:en~ion ExpLora'tion Ex xon Marathon Mob i 1. Nob ii E & F' F'hi L L ip.s F'rudhoe Bay We[[ R & D $ohio :-,S"t'a't'e of A[a.ska Texaco Fi [e.s ARCO Alaska, Inc. Post Office E, ,00360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date: October 23, 1985 Reference: ARCO CH Finals ¥.~-27~'~-:T~perature 10-13-85 Run 1 5" Otis 4-31 ~CBL 9-6-M5 ' 6-10 ~ol lar 8-30-85 9-5/Collar/Perf 9-2-85 9_31~ CBL 8-13-85 11-4/D'~i f f T emp 112-3/~CL 13-98 DIL< 13-98 DIL/~-~ 13-98 CNL~- 13-98 CNL 13-98 CNL -/ 13~98 CNL ~ 13~98 CNL ~ 13-98 DIL ~ 9-7 -85 10-2-85 4 -5 -85 8-14-85 5-1-85 5-1-85 4-5 -85 4-5 -85 6-28-85 5-1-85 2 5" GO 1 5" GO 1 5" GO 1 5" GO 1 5" GO 1 5" Otis 20 5" Sch 23 5" Sch 13 5" Sch Epithermal 13 5" Sch Thermal 12 5" Sch Epithermal 12 5" Sch Thermal 14 5" Sch Epithermal 21 5" Sch Pam Lambert ATO 1429C Trans 37 2 'Exi~:.- Services Ext;' Exptoratio~<~ Exxon'- Marathon PB Well Files R&D ARCO AJllkl. Inc. ,s · SubsJcliarv of Alllnlicl%ichtielclComplny ARCO Aleska. Inc. .,~ Post Office 100360 Anchorage. Alasl<a 99510 Teiephone 907 276 1215 Date: September 16, 1985 Reference: ARCO CH Finals 3-2 PLS ~'~ 3-27 Spinner ~~ 9-3 Spinner ~'~ 9-3 Fluid ID 8-10-85 Run 1 5" DA 9-1-85 1 5" Camco 8-30-85 1 5" Camco 8-31-85 1 5" Camco Pam Lambert ATO 1429C Trans 319 Please sign as receipt of data. Received by ~ An~hor~e Chevro~ Phi 1 ! ips' D & M PB well Files Expl. Service.~ R & D Ext. ExploratiOn Sohic~ Exxon-~ State of Alaska Marathon Texa co ~ Mobi 1 ARCO Alaska, Post Office .100360 Anchorage, Alaska 99510 Telephone 907 276 1215 September 10, 1985 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 3-2 DS 3-27 DS 3-28 DS 3-29 DS 3-30 Permit No. 76-24 Permit No. 84-62 Permit No. 84-72 Permit No. 84-79 Permit No. 84-83 Enclosed is the Completion Report for work done on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JEB/cb Enclosures cc: SOHIO Alaska Petroleum Co. File P1 (DS 3-2)W4-3 Pi(DS 3-27)W4-3 P1 (DS 3-28)W4-3 PI(DS 3-29)W4-3 P1 (DS 3-30) W4-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ' ~ '-~-- STATE OF ALASKA ~'-~- ALASKA--:-_ _AND GAS CONSERVATION CC" ,IISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well .OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] :2. Name of Operator 7. Permit Number ARCO Alaska, Inc' 84-62 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- .029-21109 4. Location of well at surface 9. Unit or Lease Name 21' FWL, 780' FSL, Sec. 11, T10N, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 67' FWL, 91' FNL, Sec. 11, TiON, R15E, UM 3-27 At Total Depth 11. Field and Pool 99' FWL, 62' FSL, Sec. 2, T10N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial N, or ~v.4 Prudhoe 0il Pool , 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions 5/02/84 5/15/84 5 / 21/84 N/A feet MS LI 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set ] 21. Thickness of Permafrost 10825' MI) 9223' TVD 10773' MD 9173' TVD' YESI~] NO [] 2173' feet MDI 1900' (Approx.) 22. Type Electric or Other Logs Run DIL/BHCS/GR/SP, LDT/CNL/GR/Cal, CNL/GR, CBL/GR/CCL, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5~ H-40 Surf- 80' ~o., lg~0# Po!eset 13-3/8" 72.0~ L-80 Surf. 2&04' 17½" ~Of')f"l _qw C.q TTT + /,nl~ ~w '--q II 9-5/8" 47.0# L-80 Surf. 10203' 1~" 7" 29.0# L-80 9893' 10817' 8½" 340 .~x C]m.ss "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 10290' - 10318' w/6SPF 5½ 9931' 9865' 10503' - 10518' w/1SPF 10547' - 10569' w/1SPF 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10588' - 10602'w/1SPF DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Perf'd on 8/2/85 TVD of perfs: 8708' - 8905' 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) 8/2/85I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE [GAS-OILRATIO 8-23-85 4.0 TEST PERIOD I~ 449 366 342° 550I 815 Flow Tubing Casing Pressure ICALCULATED,~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press;343 -- 24-HOUR RATE i~ 2695 2195 2051 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED Alaska 0ii & Gas C0.s. Commission Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE ,.. : ' 0'i M; T'bN'TESTS-I ?'?"- NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUEVERT. DEPTH . GOR, and time of each phase. . .. . Top Sadlerochit :-10222 8641 N/A "- GOC 10304 8720 · , Top Zone 3 ¢ .._: !. '_ .10374 8788 Top Zone 2 10438 · 8850 HOT : -. ~ :10597- 9003- · 10627 9032 · op Zone 3_~ 10658 9062 ' . '..' -' OWC 10679 9082.6 Base Sadlerochit 10711 9113 : ; . · 31. LIST OF ATTACHMENTS . · . . . .~. 32. '1 hereby certify that the foregoing is true and correct to the.best of my knowledge : Si~ned Title Date INSTRUCTIONS General' This_form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL I-~ OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well At surface: 21'FWL & 780'FSL, Sec. 11, T10N, R15E, OM At top producing interval: 67'FWL & 91'FNL, Sec. 11, T10N, R15E, UM A~ total depth: 99'FWL & 62'FSL, Sec. 2, T10N, R15E, UM 5. Elevationinfeet(indicateKB, DF, etc.) 62' RKB 12. I 6. Lease Designation and Serial 7. Permit No. 84-62 8. APl Number 50- 029-21109 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 3-27 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations ~ Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation on 8/2/85. RU perforating unit and pressure tested equipment. RIH w/gun #1 to shoot interval 10588-10602'MD (1 SPF). Shut in well, POOH, all shots fired. RIH w/gun #2 to shoot interval 10547-10569'MD (1 SPF). Shut in well, POOH, all shots fired. RIH w/gun #3 to shoot interval 10503-10518'MD (1 SPF). Shut in well, POOH, gun did not fire. RIH w/gun #4 to shoot interval 10503-10518'MD (1 SPF). Shut in well, attempted to POOH, hit lubricator head and lost gun in hole. RU fishing tools and recovered gun #4; all shots had fired. RIH w/gun #5 to shoot interval 10290-10318'MD (6 SPF). Shut in well, POOH, all shots fired. Secured well, RD. Ref.: BHCS~5/15/84 Anct~ora.,.38 14. I hereby c,,ertify that the foregoing is true and correct to the best of my knowledge. Signed "///(/~'~"/J~//~~-'" Title Regional Operations Engineeruate The space below for Commission use Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date Form 10~,03 Rev. 7-1-80 Submit "intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office Box 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date: SePtember 3, 1985 Reference: ARCO CH Finals ~'~1- 4 / CET 3-'27 L~ Temp 3-5 Epilog - i3-5 C/O GR ~t3-5 PDK 100 5-25-85 Run 1 5" 8-4-85 1 5" 7-22-85 1 5" ~7-22-85 1 5" 7-21-85 1 5" Please sign as Received by Pam Lambert ATO 1429C Trans 292 receipt of data. Chevron D&M Expl. Services Ext. Exploration Exxon Marathon Mobil Phillips PB Well Files R&D Sohio State of Alaska Texaco ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 Date: September 3, 1985 Reference: ARCO Pressure Data 3-27 Static Gradient 8-4-85 3=29 Static Gradient 8-10-85 3-30 Static Gradient 8-12-85 11-2 PBU 5-27-85 DA Otis Otis Camco Please sign as receipt of data. Received by Pam Lambert ATO 1429C v Alaska Oil & ~a$ CarlS, Commission Anchorage Trans 297 Chevron D&M Expl. Services Ext. Exploration Exxon Marathon Mobil Phillips PB Well Files R&D Sohio State of Alaska Texaco Ar,.:',~c'O ALaska ~ Inc !::' ~ 0 ~ Bo× Anchoracje., A L a :.'-:.- k ~ 7 7 _:' . .. Hole Final I.- ii C .,:J d'l ,':: 0 i.... ...... C .'-.am c: o k.~ AJ~.~ Oil & Gas Cons. Commission ARCO Alaska, In~-- Post Office ,.,ox 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 October 8, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT- DS 3-27 Completion Report Dear Mr. Chatterton' Enclosed is the Completion Report, Daily Drilling History, and two copies of the gyroscopic survey for-the subject well. If you have any questions, please call me at 263,4610. Sincerely, T. L. Fithian Area Drilling Engineer TLF/JMM/tw JMM/L12 Enclosures ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany .*'~' STATE OF ALASKA --~' ~ ALASK, .,.IL AND GAS CONSERVATIONC JMISSION 0 R ! ~ ~ ~] ~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [~X GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-62 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21109 4. Location of well at surface ~ LOCAT~©~qSi~ 9. Unit or Lease Name 21' FWL, 780' FSL, Sec.11, TION, R15E, UN I VERIFiED.~. ! Prudhoe Bay Unit At Top Producing Interval '~ Surf.~ 10. Well Number 67' F1NL, 91' FNL, Sec.ll, TION, R15E, UM IB.H.~i~~ 3-27 I At Total Depth 11. Field and Pool 99' FWL, 62' FSL, Sec.2, TION, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial ,N,o~,L/ Prudhoe Bay 0i 1 Pool 62' RKB ADL 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions 05/02/84 05/15/84 05/21/84 N/A feet MSLI 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. DirectionalSurvey I 20. Depth where SSSV set 121. Thickness of Permafrost 10825'MD,9223'TVD 10773'MD, 9173'TVD YES [] NO [] 2173 feet MD 1900' (Approx) 22. Type Electric or Other Logs Run D IL/BHC$/GR/SP, LDT/CNL/GR/Cal, CNL/GR, CBL/GR/CCL, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surf 80' 30" 1850# Poleset 13-3/8" 72.0# L-80 Surf 2404' 17-1/2" 2000 sx CS Ill + 400 sx CS II 9-5/8" 47.0# L-80 Surf 10203' 12-1/4" 500 sx Class "G" + 300 x CS I 7" 29.0# L-80 9893' 10817' 8-1/2" 340 sx Class "G" 2'z~. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) NONE 5-1/2" 9931 ' 9865' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OI L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS'-OIL RATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None Alaska 0il & Gas 00ns. 00rnrnissi0n Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 JMH/WC23 CONTINUED ON REVERSE SIDE : i- . ' . .::-: G-EoLoGIcI~/~Ri~EF~S: - :. :. : '.-' :- - .....'i . .... - 'FORMATION TESTS .- · NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochi t 10,222' 8641" N/A . G0C 10,304' 8720' Top Zone 3 10,374' 8788' Top Zone 2 10,438t 8850' HOT 10,597' - 9003' - 10,627' 9032' Top Zone lB 10,658' 9062' OWC 10,679 ' 9082.6 ' Base Sadierochit 10,711' 9113' : 31. LIST OF ATTACHMENTS Drillin0 His~.ory; Gyro.~.opie Survey 32. I hereby certify that the foregoing is true and correct to the best of my knowledge _.//j. Area Dri 1 ng Engr. 1 i Signed Title Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". I:nrm I ARCO Oil and Gas Company ~' Well History Initial Report Daily . Prepare and submit the "lnit~i RI~=~I"~' on the first Wednesday after a well Is spudded or workover operation*, are steJlad. Inabucfl~: Daily work prior to apuddlng should be/summarized on the form giving incluelve dates only. / District / I County. pailh or borough I State Alaska ' I North Slope Borough j Alaska maid ILeeseorUnlt /J"~'/.~ IWallno. Prudhoe Bay iT,t,, *O~ ¢'~" IDS 3-27 i I Drill, Complete & Perforate Auth. or W.O, no. AFE 103659 Operator IARCO W.I. ARCO Alaska, Inc. Spudded or W.O. begun ID-,e IHour ]Prior alatus if Spudded 5/02/84 1800 Hrs. Date and depth as of 8:00 a.m. 5/03/84 5/04/84 5/04/84 thru 5/07/84 5/08/84 5/09/84 a W.O. Complete record for each day reported 56.24% 20" @ 120' 1205' (1205') Drlg Ahead Wt. 9.2, PV 35, YP 58, PH 8.8, Sol 6 Accept rig 1200 Hrs. 5/2/84. NU Hydril & diverter sys. Spudded well @ 1800 Hrs. 5/2/84. Drl 17-1/2" hole to 1205' 13-3/8" @ 2404' 2421' (1216') NU McEvoy Spools Wt. 8.3, Frsh Wtr in Pits f/Drlg Out Drl 1203'-2421'. RU &,rn 62 ]ts, 13-3/8", 72#, L-80, BTC csg w/FC @ 2321, FS @ 2404 . M&P 2000 sx CS III @ 12.2 ppg followed w/400 sx CS II @ 15 ppg. Displ w/rig pmps. Bump plug. CIP @ 2315 Hrs 5/03/84. 13-3/8" @ 2404' 5102' (2681') Drlg ahead Wt. 9.0, PV 5, YP 8, PH 8, WL NC, Sol 4 NU & tst BOPE. RIH w/12¼" BHA, DO FC, cmt, FS + 10' new hole. Conduct formation tst to 10.8 EMW. Drl, jet & surv 12¼" hole to 5102'. 2592', 4-1/2°, N20W, 2592 TVD, 6.94 VS, 6.94N, 2.52W ..296~', 15°, N25W, 2958 TVD, 63.44 VS, 63.48N, 35.54W - 3208', 19-1/2°, N17W, 3191TVD, 131VS, 131N, 62W 4093', 31-1/2°, N15W, 3981TVD, 521VS, 521N, 133W 4279', 34-1/4°, N6W, 4176 TVD, 619 VS, 619N, 160W -13-3/8" @ 2404' 6621', (1519') POH Wt. 9.1+, PV 6, YP 7, PH 8.5, WL NC, Sol 4 Drl & surv 12¼" hole to 6621'. 5419', 42°, N, 4999 TVD, 1357 VS, 1358N, 202W 5937', 42°, N3E, 5384 TVD, 1704 VS, 1705N, 192W 6450', 42°, N7E, 5765 TVD, 2046 VS, 2047N, 163W 13-3/8" @ 2404' 7991', (1370'), Drlg Wt. 9.3+, PV 5, YP 9, PH 8, WL NC, Sol 5 Drl & surv 12¼" hole to 7991'. 6969', 43-1/2°, N9E, 6146 TVD, 2395 VS, 2396N, l14W 7465', 46-1/4°, N10E, 6498 TVD, 2740 VS, 2741N, 56W The above is correct Signature For form preparation and d~ll~ribution, see Procedures Manual, SeEtion 10, Drilling, Pages 86 and 87. IDat, 5/22/84 ]Title Drilling Superintendent AR3B-459-1-D INumberall daily well history forms consecutively P~ge no. ae they are prepared for each w,,ll. I ARCO Oil and Gas Company Daily Well History--Interim Inslr~clione: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number ail drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "lnfarlm" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequenlly than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until complelion. District ICounty or Parish IState Alaska I North Slope Borough _ _ ,b Field L ...... Unit ~,) ~t~ Prudhoe Ba' ADL #~1:~, ..~ ~' ~7 Date and depth as of 8:00 a.m. 5/lo/84 5/11/84 5/12184 thru 5/14/84 5/15/84 Complete record for each day while drilling or work@var in progress 13-3/8" @ 2404' 8851', (860'), Drlg @ 8851' Wt. 9.7+, PV 9, YP 5, PH 8.5, WL 12.4, Sol 10 Drlg f/7794'-8851' Sur: 8723' MD 43° N7E 7382' TVD N3625' E70 Alaska Well no. DS 3-27 3626 VS 5/16/84 13-3/8" @ 2404' 9381', (530'), Drlg Wt. 9.9, PV 10, YP 5, PH 8, WL 7.5, Sol 10 Drl & surv 12¼" hole to 9381'. Surv: 9203', 40-3/4°, N9E, 7739.76 TVD, 3943.81VS, 3943.21N, 115.19E 9-5/8" @ 10,203' 10,453', (1072'), RIH w/bit Wt. 9.4, PV 8, YP 5, PH 10, WL 7.0, Sol 7 Drl & surv 12¼" hole to 10,225', 12 std short trip, CBU, POOH. Chg rams to 9-5/8" & tst to 5000 psi. Rn 260 jts, 47#, 9-5/8", L-80 Butt SMLS R-3 csg w/FS @ 10,203', FC @ 10,119'. M&P 500 sx Cl "G" w/.75% D-31 & .15% R-5 @ 15.9 ppg. Displ w/735 bbls mud using rig pmp. Bump plug. CIP @ 0300 hrs, 5/13/84. Chg rams to 6" & tst to 5000 psi. Instl 9-5/8" pack-off, tst to 5000 psi. RIH w/8½" BHA. DO FC & cmt to 10,191', tst csg to 3000 psi. Drl cmt, FS & new hole to 10,236'. Conduct formation tst to 11.4 EMW. Drl to 10,453', POOH f/wshout. RIH w/new bit. 9-5/8" @ 10,203' 10,825', (372'), Logging ~Wt~9.6, PV 12, YP 8, PH 9.5, WL 6.0, Sol 8 Drl 8½" hole to 10,825', 6 std short trip, CBU, POOH. RU & rn DIL/BHCS/GR/SP f/10,826'-10,195' WLM. Rn LDT/CNL/GR/CAL f/10,825 to 2404'. 7" @ 10,800' 10,673' PBTD, POOH w/BOT setting tl Wt. 9.6, PV 12, YP 8, PH 9.0, WL 6.0, Sol 8 Rn CNL/GR to 2404', RD Schl. RIH to 10,825', short trip, CBU, POOH. Chg rams to 7". Rn 21 its, 7", 29#, L-80 SMLS butt csg. Pmp 30 bbls caustic wtr, 40 bbls BJ mud sweep & 10 bbls NaC1 wtr, 20 bbsls FiD-check SS & 10 bbls .2% NaC1 + 5 BFW. Drop plug. Displ w/205 bbls mud using rig pmp. Bump plug. CIP @ 0245 hrs, 5/16/84. Circ & ¢ln DP, POOH w/setting tl. FS @ 10,817', FC @ 10,774', LC @ 10,690', Mkr @ 10,233', BOT Hgr @ 9902'. The above is correct Signature ~ . . For form preparation and distril~tion see Procedures Manual Section~O, Drilling, Pages 86 and 87 IDate JTitle 5/22/84 Drillin~ Superintendent AR3B-459-2-B Number all daily well history forms consecutively as they are prepared for each well. rPag~ no. ARCO Oil and Gas Company Daily Well History-Final Report Inslruclions: Prepare and submit the "Final Report" 'on the first Wednesday alter allowable has been assigned or well is Plugged. Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended lot an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. ICounty or Parish Lease or Unit Title I Accounting cost center code State North Slope Borough Alaska Well no. District Alaska Prudhoe Bay Auth. or W.O. no. AFE 103659 Drill, Complete & Perforate Operator IA.R.Co. W.I. ARCO Alaska, Inc. 56.24% Spudded or W.O. begun Date Spudded 5/02/84 Date and depth as of 8:00 a.m. 5/17/84 5/18/84 5/19/84 Complete record for each day reported Iotal number of w.ells (aclive or inactive) on this ost center prior to plugging and ~ bandonment of this well I our I Prior status if a W,O, I 1800 Hrs. 7" '@ 10,817' 10,592', Drlg cmt Wt. 9.2, PV 12, YP 8, PH 10, WL 6.0, Sol 8 Chg btm rams to 5", tst plug. TIH w/9-5/8" csg scrpr, drl cmt f/ 9688'-9893' TOL, circ, TOh. TIH w/6" bit, tag cmt @ 10,501', drl cmt. 7" @ 10,817' 10,773' PBTD, Prep to log 9.5 Brine Drl cmt to FC @ 10,773', tst csg to 3000 psi. Displ mud w/9.6 brine. Chg rams to 5½", tst to 5000 psi. RU DA, prep f/cased hole logs. 7" @ 10,817' 10,773' PBTD, RR 9.5 Brine Tst lub to 1500 psi. Rn CBL/GR/CCL f/8427'-10,772'. Rn 229 its, 5½", 17#, L-80 8RD AB Mod tbg w/GLM's to 2174' & lnd w/tbg ~'t~l @ 9931'. ND BOPE, NU & tst tree. Pull BPV. NU & tst tree to 5000 psi. Displ w/615 bbls crude, followed by 70 bbls diesel. RR @ 1730 hrs, 5/18/84. SSSV @ 2173' - FHL Bkr @ 9855' - XN Nipple @ 9917', Shear Sub @ 9931', PBR @ 9831' - GLM's @ 9704', 9550', 9384', 9228', 8867', 8713', 8084', 6809', 5030', 2855' Old TO Released rig 1730 Hrs . Classifications (oil, gas, etc.) Producing method ~C~.~ Flowing New TD I PB Deplh ~0,825' I 10,773' Date Kind of rig 5/18/84 Rotary IType completion (single, dual, e~c.) Single Official rese~oir name(s) Sadlerochit "~i';'~ ' Date Reservoir I Producing IntervalOil or gasTest time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct Signature ~or Iorm pre%aratioa and diat~ution. see Procedure~ Manual, SectiOn Drilling. Pe~es 8~ and 87. Oate 5/22/84 ITM Drillin~ Superintendent AR3B-459-3-C · Number all daily well hislory Iorms consecutively las they ere I)repared for each weB. Page no. 3 Dlvlt~on of AtllntlcRIchfleldCompany SEPTEMBER 12, 1984 Mr. Randy Ruedrich ARCO Alaska, Inc. P.O. Box 560 Anchorage, AK 99510 Re: Our Boss Gyroscopic Survey Job No. AK-BO-40044 Wel 1: DS 5-27 (SEC 11 T10N R15E) Prudhoe Bay Fi eld North Slope, Alaska Survey Date: MAY 21, 1984 Operator: MoGul re Mr. Ruedrich: Please find enclosed the "Original" and one (1) copy of our Boss Gyroscopic Multishot Directional Survey on the above wei i. Thank you for giving us this opportunity to be of service. Sincerely, NL SPERRY-SUN, INC. kb/AK Enclosures BEEN BROUSSARD District MANAGER :.E;PE]RF;Y-:E;UN WELL E;LIRVE¥1NO COi.'ii'.:'A!',.i'v' ANCHARAGE ALAE;KA COMF'UTATION DATE PRUDHOE DAY . A L A S K A :": :' "- -. -. . VERTICAL. RE:CTION CALC'ULATED ALONG CLOSURE f'." [.'.,P:E: i: ....... DATE OF:' SLIRVEY HAY .':;:.i.. i':::'O..':i. J~i{O::;:::; iT-:YRO:3I:: f]F:' .]: C ::3i .:f ;t. '{~" .. ,_.t t:i [-'i NI_Ii¥|BER AI<:-E:O':--ziC;C¢,':i 'j k:EE'L¥ BUSHING EL.E:V. ::---: ,.'::,:2,: O0 Fi',,. - 'OF"ERATOR-IdCGU I RE __ TRUE :A COLI :t ON () :1. 00 (). O0 -62. O0 0 0 :1. O0.00 :38. O0 0 .';-22 200.00 1:38.00 0 22-':' 'AL N O. O E 0.OO S 82. '-'c . ....... ,=, .) W C). :.::; i S ::::9.30 W 0.04 0.00 (3. ,';~() (). 00 O. 04 E; O. :32 W --(), 05 O. 0 E: :'::.'; <':j, ':::'<::, i,....~ -. 0, :[ () 2'.:,'9.99 237.99 0 22 :799. '? 9 3:':: 7.99 0 15 q.' :; ':". 'F"F' 437 · ':?':~ (') 2 :i N 76.'69 W O. ()'F' Iq 6/_-...60 W (). i 4 N :38.8,3 W O. :I. ;-:' 6, 0 () '7 () 0 8 ()() .'. '""'-' ':;":;' 6:37.99 0 10 ;, ;, ::, ,, ...: .... 7 ':;;' 9.99 7:3'7.99 0 10 .i. ()'.:.';' i). 96: J. 0 :.':': 7.98 0 :20 1 i 9'F'. '::;'8 117:7.98 0 :1. 29,.9.98 . 1237.98 0 ..... .:,.:, .7.98 0 1 :': '::~':,? '.:;'E: 1 '-"-'" i 20 () 130 0 140 () i ::30 () i 7'i::' 9.98 1737.98 ,0 23 ]. 900 189':? ,, 'F' 7 1 :E: :37. 97 1 () 2000 19'::;": :'. '.:.? :'3 19 :'37. '? ::-.': :;::' 0 :F_:: '7 4 ,, 50 E lq f::;';;'. '-'"' ..... :,'J N gE-.;,,::.":..? E' .... 0 ,, 47' :2:2 ()() 2 :.'.':: ,.":i 0 219".:.';'. ,':-, 4 2 i 37. E, 4 :3 J. 1 :2 '2':;' !::' ,, .5 i 22:37. '":":._, I 2 ..:," ]. :2:.'.'::: 99.4:3 2 :::': :3 '7 . 4 :}.': :2: () 24 ':? '::?. :::?, 7 :24:37' ,, :37 2 .:,'-" · ,::' ::::; 99 ,, ! '7 2-':.' 5:37, 17 5 4 · - kip I p :~,<! t~{C,~ ~'~ T-t:.lJ 4'--'1 ;1 .~j'¢tF.:~;.Mx.t V ANCHORAGE ALASKA ARE:O ALASKA iNC. = ?'..::: :'ii:--',.';";:" ( ::;F'r':: '1 '1 T 1 (':,i'~ R 1 ~]F ) I-:lqhlF. I ITAT T i]~ ["IATF '"'"': "'FRI'IDHil ~:::' {: ~;Y: "', :':':~ ~ ::'"-'~':-~:;~'-:'~ ~:-.: :::: '~::'".::::":'~.~':::~::-':~:': ': "'~;', :~"~:" ..... ":""":'- ?-::.~...~:- ~ ?RL. E E .... 4 ~., :~::., ::-~:::..:..~ ,:,:.: :::. ~.,: :.,......~.-::.~:~: ,~c~::,:' ............ ? .................................... "-' ................ :' :'~ ............ ':""M~Y:':' '2]~:~:::':':~'t~.8~ ........... ' ............. VE. RTI'CAL_ SEC'l-ION C:AL.C:LILATEB ALONG CLOSURE DATE OF SLIRVEY MAY I<ELLY BLISHIi',iG ELF-V, .... · 62.,00 F'T'. I]t::'i--. R'ATI]F;,'-Mf':i]I I T RE- ..... ...... TOTAl REC'TAIqGI:iL(4R COORD ):- N(:'.. TE"::::: i',i0 R "1' Fi/:~; ~:.'~ I..i "i' J- -i i.': A '.'-:, I" / .t. ii .... ' ::;i:i.C: I i ~/ ...., 04 11 1 N .'_--:2 6(i .W 2 '-'::' 45 79 I',.I ..... ' ..... . · . . .'-,....: . ....... :, ,.. ~, ~,...j ,..,,t ....,'"-. 6 '..';' : 2,.%'-"".h:) 284/--, ()2 27:-"":4 02 12 ,":', Iq 32.1'.-:',' W 2, 17 ':~' 25 .... ...... 4 ,, N 10 :'3/-, [.,-,i 54- ,, 0/-, 2?00 28'.:.';'4 ,~'Z4 2,'.-.4.32, 74 1:3 47 N :30,, 19,' t.,J. :3, 50 6:3 ,, 84. I',.I ! 6 ,, 6!5 (.,.J 6:3 ,, .54 i:~ ... · ..... . ,:, ,_, ~..=. ,:. .S~,I '...-,' *,,. "'.. ' .", ,-,, r;:: " ' "". "::':'.',: ..:.":v :...'..~ ...::....:'~. . ' ':'::":'"' .... '"":'""':':i;"" ' '"'" ....... '' ' '; ..... ...::. :. ~:. :.~. :~ ..... ~ ::. ..... ,~., . .~ o.,t 4 :..:,., ~ .,~ .'.... :::t, '~:.~.... :':,~ ¢, ~:t .~ '.;.Z:~.~ .'?..: :~i:t;:::::;<::?:::;.,':l .~.,. :.:..?:~.:.!~ n, t. :?:.c....::i:i..N ?~:~ ~'i:'~T.~ ;:'t :~;. ".'~.~:.' '.t tl :.',:Y ::?2',; 1 -. :"....;... '" ~ ~ ~;'. ":? N'..- 2'2 ./..~.,~ ~.:. :.'_'f ;!;:.'::?:.:!:::.:i.¢:. © '::':' .... ...... ...... ;O"N :::9 ....... !'.":-':':.: :':!"" '¢t('], '::: ':'?":':':('i~77::Y':::~:.'.¥'::''''':':'':::';:'''': ':('I"--'4" '='"." 17 8'-' ' !~! '%,': '"':;--,, .~,1 '~ ~?"-' ~ '~'~' '"".-.': ,'~ .z.~:':¢ ..... : .,,.,..1. ....... ................ .. ............... .,.~. ..... z_ :,..:..-: ..... .,::. ..... :..::,.-", ,~. _ . .::_"::.:.';' ..i,i ......... i_.:L1 8(') ~ ':~ '20 () 318 i, = ':"- ":',' .=,':"- '-, · ::,. ', 31 .1..'. ...... , 19 :B 1 N 2.1.,/_-, () N .,,:. 30 141 · 79 !",I '::" '". :2'7 i,J " ....... · ..... ,'., :1. 4. O, ~::~ 1. " :33':"1,3 '-' '-' -" ~::~ F:; - - - ..... ........ :,,:://4 :.:~Zi'-.--'.'-'F, - /.::, N 68 ~.:¢.':.:, W :1_74 ':2'.:.;' . -. ¢,.- 22 :.3'F.,' N 19..'=:~0 W :3. :::::3 .1. .... -, 4':.-,' . ,, ~ 3 4'(')("I' '-'"" '" '= .... '"'"" '" "' ..... ' '-," · '-,,- .-, ........... · ",.","",,", . ,~ ~ ", ',~,~'4- .,.,~ ~ .r 4 "~ ~ N .1. 4 - ,' t, ,, /'.::', ~::'"":I' 2 ...... - ..... .--: :: ,.-: - . :-:'-, .... ,.. :....: ........... ,: :-.,- .... . .... ,- '4 .,;: 21 ::-.':, 7 N. :::;: ~,..' ,, '.'t, I ~!'::: .::.::"' ::?::in o..~:.,. ......... "' ": '" :':i 4'-'=; A': ' '?'"'""~ ':- ............ ':: 7. , ...... ,'. N ':': ":'" '.1-: 1 Y'i.~ifi':":"t,': ':¢ .,..,'::' 4,o :,..':-, !..., ":: "~":";" :" :'""'":"~",. / ", '":r'4 ....... ;:.:,,:"i ,, :1. ' :'./:';' ,'.':- ('! .,'"i '"" .... ' ~-' · ..~ :'", 4 "', ,, ,4,/- 3,.1. 8 :B 66. -.:.'7 42 N 1 _1_. ~::~'ii:, W i. ()'? .......... ............................. :-:I00. ~'~:'"i~ N ':?':?', !:.!:;,':!:, t.i '?'il.'i?l,, ,'::,'? ";'" '"":"'"'""~ ":~,":~&,, (~L. '-'""':i' '-' " :,:,/ ~.~,~ ',. · I""' · · .:: ..... 7=,, ~:E! 2'7 5';' N i i S,n, 14 0.,,_2:?: .... .'!::/],..'... .1.:.-;, N in":'-. -i ':", .~ ':-"4.,"' "::'.~':~ ' " -~ ~ - , ~ ' . · ~ ....... .:2,.~_..1~,_,,_~,.. ~_'. _ ....i,: _-' ................ ;,.,' ...... ~.~,t,..~..~....iL ....... I 3::ii: 0 ~'":, 2'722 '77 :B 660 77 ';' 7 · ' .... ~.. ..... . .,, .. . , N !:4,,,(~,.0.. ,W .. 1.60 ::-":91..i 2 N 1. i '9.. ? :'::':;;' ,~3 c:, :"-','::i"i["1 ..... i"A :':;74'.:./ 1,"-, 2:.'-_-: 4.1. N 1 "=':; '"" . .................... z, ._-.,o W .1. ¢-'.,:.::~: 4:36,27 N 13 !, 7'::i. i 40(:,¢} ':', ;: ':;' :::: , 2 d., :.:..:,'_:::2:./.-, 2/_-, :30 8 I',! .15. 1¢~ t.,...l i 4/-., 4f:::'::,' ,,'-,,,'..., j-:l .t.f].z~. ,,:.-';, l:::.:.....:,: ,;: :,?,.,...:,;:.:..'....'...:' .~.. ............. .. . ............................ .',~i-',..~ ....3:';';'::-':~. 0':.'" .... '"" ...... ' 0':-:' :3:1 ,64. N i4,8() W .i. 6; " 't '..,':".. '.:.':.:: .N.. ...... ;:, ;' z:.,:.:.. . .... 5; .3 :':..::., :':i: -/i (,~ ....... !...' .':..: (:,, ........ .. 42(",) ,i,.':;:.,'.!:,:.:i; ,, ':!.'.':; 4(:.,0~:, 4-!!!.; :3:.::: :.':i: f",i:i 2,, 89' t,',I I ,, ..3 ..'" 5;?,!::;, :'"::,:k, ~"-.I '7O. ,.!" ... ': "2 .... :,'7 · .- ! .... .,. . , .... t .,. ,~ ?:',..'.0. ~., t .., '~ ', .' ,,'.i.,"~¢"':;' ":;";:' ............. " . ..... ,... ,,. .~ ·. .... . .... ,.-. .... · .............................. ......,,.,.., · .'t._..;.:.~ I',L :i:" j..,o ._,...¢ ".; ,":,.>';'? ..,..,_,_.N ................ i:.~ ..... .... .................... .,. ..... I..:z ........ i ~ - ' :' .~ .I-i.:35(.~ 4 _1. '""'-' '='= 4.1:30.55 ""'::' 5, O,/-, ' ::' ;: .... ..,,...., : ...... 2,.'!:, J"4 ::_:;. 30t,,.I :[ '? t 6,'"-,,':::: :3 ('l 1"4 1 ::::- 5"- 22 i 440 () 4222. () 5 417.1.. 05 :B 6 1 'i;'; iq '7;". F::'? {:,,.t I ,, 84 6'~:"?, 3:2 N i ii:i'?. :35 (,.,J ,::-,'i;) 4. ¢.', 0 !. 4500 _ ,':J~l 1, ,'.:,':,.":, 424':::', 86 :':.:'i:¢ :':::!::: iq 7 .~--,()I..J :'::~. ::: 7'::;':' "' 'l t'-,~ ....... ? - · . : ..................... . · ~, .~., . . ............................... .t. :'-t -,L.,~_f,'.;~ / :::),:+ ,, 4(':,0().:.: ",,"~ '"'"'~'""":'~-~"?'.:: '-"z ...... '.~,,= ':"~:?:?';'..::"::.:.:":".:' .... .4- ::..,". . "¢-' .,.:..- i .... " ';.': ':::":. :' : ? ',. :' --.-. ::.'~",'.':~.":::.::':.:' ...... ..... '.".." . ' · ..... : ' ...'". '' '..:.~.,:.'..',' ;: ..... .' .... . ..'..-'. ..: ..... .:"..". .' · · ¥-.:-::.,-/., ...~ .':~' ...... ': t:.::,~,:::~.,'.',,~.',':., "? .~ ...... :',. i"i ..' ,, :.:::':-'" (,..'. :.' ..... ::..i ,:':,.:"..", .. '~'.~ .; .':i .... ..' ..-., ' ' '. .:.. ) '.., . ,,'i ,:') 4:7C"-'} -".'i.'-':J.,'.':',..t, :~".:f:,}" 4:_-',"i."','?, ~:Z::'~".: ':~.'.:i ! ,':', i".J '7, () !,..j "."., ::.'; :';)'i')' ;' ., :.i,.'.') J..i ':': i. ,.'i. ,..". ',., '... ::!,, '/'.:2 · ':!:'i:;':::'zTi:':;-':'~¢; 4 5 :':': .'=; ,, ':;' A 447S' '.:.-;v.':,. ................. :"L"' ...... ';... ~" " ' .... ~ '~ "" ..... ' ........... .............. . .......,.'..' __...~.~..._.'.'_:._..I.., .......... !.-.:,..~..t .................. .: '_.,_.:...,.._L :". ~'; ": ' ' ~ ,. .................. '.... ....................... '.::. :.: ::....,. ~:. ...... ! 4'? 00 ,..'t,.:., 1 ,'"; :37 ' '::"' ' '"" 37 ..... 4 ...... .I.,'.:':, 41 47 N ,'"., ~"~ t.,,,I ,'"~ 41 102',7..', '::"- t"'-.J 22'?, 4:, .t. ,. 'L c3 'i. 8 4';;' i ' "' '"' '" " - '" " -.. ~ ........... ..)...5 . . _ ,,, ¢ !50,:30 "~ ,' '""" "':' ' ,::; ..... · .--,.:,,:,4, 7A 4622, 7,'_'-, 42 ::, N :3'.-:;' 1,4 () 5,:'.' !0::i~':;;',,('i.~:' t",i :2::~;6.,:2~"', i,,.l -i 084 ~:::'7 !::; j. (') (') Z: "7 ~:::~,::) ' :::, z. ,,: ..5, '7 .".:' ,. - ,:-] .::, ,~ ., r.:. ,. . .- --:,. . . ,...~ ........... ) · ...... . f., :? ....,, .I:.. :,:, . ~!.?.:L,:...?. ~ ~-.:::.'. ........ . ......... ~. :[ .r..,,~ ........... !.'.! ...... 4. ,. ..:,, ~..! . t-.;I .... ~,,~,, ,' .~ i, t .:::,.3., :::!':,. I',1.. 2'42,, O j, ~,.~ '1. :t 5].., :':~"~ ~"'" .':i.'t . : :4 ~ :'.:!;' :3 ',, ?0".'"'":" ':' 4"7'~7 t[ ,'.~;~'O::"'"::'"':::::::'?:'::"::::':~'.~l:.' :": '"::::: ':'::':N"~'~'": :'?..:r'~'~:(!:iiO':: ::::l;?'' 4.~!:!i.:''~ ..... ' .,"."'. :':,.' :~' :'. ',;".;',.:'",:'"'":"..' · .~.. :.. ,:" - ...... . :;:i'..::. .~..,;:.,::. ~. , ,::~;:::, l'.i .,::: ":'i. ,':::, ,, ~::,..:" .i..,;:..,. / ,, .Z,"-..,' ·: :.4'i~;'i)i-:-~, S7 .,:1-~"_'-'~.~:1.6, ,'.':37 41 16 i".,i 3, :30 i.,.J 0, 4 .'.::.; .i. 237,, ?:3 l'..i 2.'.'!;0, '?2 :.i .i. :;..".:.:iii:3, ,:'.i. 7 .:!:i:~",.':(:':": ,,. ""::' :'::,' ':~:"::' ~':::'":':~ .4: ~ '-":""' _. i",!, ......... ' ........ ":'"""" .......................... , - ...... ~_,,_k: ~.{.... E'~_ ............... .(...!~.':,_._'. ............ ~ ..-'.', .:,::'- .-;,:L,,... '.':"_ ~.._ hL ...................... ::.'.;;'." '"'"[., _~.:,'-...2' .. .- ' ......... .~ ..... . ~..~ .................. 'L~.~.~..,,....'~ ...... ARE:O ALASKA iNC. DS :B-27 (SEC _1.1 ANCHORAGE ALASKA T 1 ON f,, 1 ._,E ) COMPUTATI ON PATE VERTICAL SECTION C:ALCULATED ALONG CLFL':_::LIRE DA'T'E OF SUi~;.:VEY t"iAY Bt]SS ........... rSYRL")SCOF' ]: F: '::".L .,':-":,. ,,:;::-,. v ' ,JOB !.,;:'NUMBER ':"Al<- b r"~. 4 00 '-'~ ::i. OPERATOR-MCGU I RF' TRUE ']}.;;?i:;':.:...-" MEASUREI] -\,.'ERTl CAL' !:~ili.::)j.':' (?.' DEP TH DEPTH ':'I,iB-C'E ~, C'nLlR::'E i--,Qt IF,'C'E DOG-LE6.~ TOTAL '-'~ i' .... '"'t'. ~ ..... ?' "~ ~ '-~ .......--..'.~ .'~ · tit~ . ~ · vE'R;T,,ICAL' ¥':.INCL'I'NAT:I ONi}}.-"?.'Ei. ii:RE'C~iii:i:iN;;:.:' :'..:E;EVER'izTY'. ..;'REc.iiAt'~4'~4~iLAR' COORO i.N::::, TE S DEPTH DEG M I N DEGREE':B ' DEG/1 ()0 NOF,:TH/SOUTH EAST/.:..Ji:;::S'T' 5,!,0(') 570 C, F:;059, 04 4997.04 41 ! 1 i',1 :2. 1!? W ("), 27 51:34. :3::::: 5072, 33 4.1 7 N 1,8'9 W ,n. ';.2 I 520'.:;', :i.:..:O 514-7.80 4() 5.'.-:: 1'...Ii, 60 W O. :32 · r. :; .-, c,,-; .,.",/.~ .;. :. ~,-.4¢~ :~;/-2~: :..::. :?.;::2:::4 ":':.' :/:" · ::'..L,~'. ~ ·" ' ::'c, ':' i:: '..:!;.'~¢':: "'.'...;;'?: '.~':.:. ,:,C.,' .' ,.i'. · "" ." .... ' .~. :' r.:i' .-, .. · ·. ,...¢;~-,--? i,..,;:,.:2. ,..' . :.' "~4'~l.*;t,~ .:.~:':?v ::'," :.. '.:- .:'. '"'~'-~. :..' '::' ~-,? ':.';.'.:'...:' '-,: I~/... l.!., ',;,.,;,:.' W . . :.>t,.!;:, .~;;, :' .'"'.. ";:!' ..... :- ..... N..,'.. ['.." '"" '"'"'":'[. 54.:B4 'i;;",-B F, :':.',' 7 '2 ';:;'::i ,'.'1-i ~:;.'"' .,. ............... -:, Iq '~., 8'.:.,' ii'.". .._ 1419.88 N 256,. 85 H 1 415, 3,:.'.':, 1485, 65 N 25':.-,-',, 2 i W 1481,02 1551.2:3 N 2 6 ;il., 2 i (.,,.~ i !546 ,, 56 . :' .... .~ i.!.:" '":'.'~:.::' ...... '" ..... 'Z ' '"; ...."'~"~,,~ ;~''~., ~','"t"' ,. .~- ' . . ,. ':':,:; .". :'....' :'i': '. '! ,.'....6', ,.'~'..'~' ' N .:.:,.,. ..... . ..~:..~ ,.,, ..... l,. i .~::, i :,~:..~...t~'c,'.i...,.. ; '>~)~,:-.."'.,i;.:i'7.;i_'s.,4D" .' :' '.;.:7':'i:'>:.','~'/.:; "?~'~r ~ ;":, · .' 'a. r; .' '. ;;. ;',,;~.-:.'"' '". ~" i'e ..... .~:..'~'o,_,' 'N' .'-..".'. z.'6.,:..,,:::,.I. :-',.~ I (~,',-",~i..;-t.,'-., .1. 74'.'7~,, 40 N :26.1. ,, :3.'.":, i...i .l 744,70 :.'.;7.:'-., !.;', :":in 5'70,7, 5c; 4 ;,.:" :;.:','!., i',.I ,:1-, :.:j:'!;' i:.." 0, '::. :. ';:;:O,::i.'i;,', 8:i-'.", hi 24..I, .' '.. ,... ,,':,,:.':::'., .,";-:.-:: ,":, i. '72,5'7 6110, 57 '. 4,"I- 1 'N '7, 6,0 E 0 ,. :25 :242 t, t'....P5 N 20!=; ,, ,:'~.F'; ~: .~ 6244 07 61'::'":' 07 4'"i- 4.'f lq 7 ~';':']' E F; /-,7 :'-'i:49'i ....... ~.. 2'-'+;::::/..,:'",:"', ....................,..,~. '..::t:, l",i 1 '.::;','.'!:, ,, 2'7 ~. i ................... 7;30() 6:.:::84, 56 6,{.::2:,"..:.',,..:.:;6, 4:,2, :B N !50 E O../':,;7 :26:B2~ 39 i':1 1'77,,81 W '74"":, 0 .... ::' "" ......... /., :391 77 .4. 6 ' .... N ..-'. ":-: 9 t:'.Z 0, :3 :;ii: 2 '? C:, 0 -:;' i .... c,'.l ...... :,, // _ . . :2:Z - ._. :;:"7(".~:':::, '.';:"7 N :i. ~!',¢i!i:, ,:'.i.!:::; :.-;~:::.'.(,~;,;i~ ;. -""-"- '"' !' ':' ' "' ...... "" .... ' ..... ' ' ' ',:'::,~::,"xz';~';.'::::~ : ,'/.i :'::¢4:::':".' ".,:' N';':' ; .,..,-,., '..,. z :' ':, ,, "t' ,':' ';,:'.'.'~:,00 .,:., !.:.';':i;":::' ., .i. 2 ,/:,!:"i;::30, 1:2 4,".':, :i. "ii:' i".,i '7,:'.>:} E O, 22 :2E~47, .;:_":2i"'.l ':', .... : .'.:, . ' . ,:.'-.i 4. ' '::, 770(': .,.!.,;!:,61 50 6!":';'~;"~ 50 45 4-':;' ,N -z 't'('~ E-' ~", :'-';i 2'.:."' ! ':":',.., ,, ~..~,i.:.'.-~ i'..i !..'. ~ ,' ..... . .'.'i S!'"; · . ~, . ~ .. · ; ~ .... -.,, r. ,..._,.,:,,/L..' .......... .' .; '7'F/f 'K) 68("}0,, 5.'-::i (':-,738 =;= . ,, ' ........ . ....... .... "' , ..... , 46 7 i'4 ,'":',,6'.:.~ IF: ~. :.::,:'~, :':J:(),Bi :,:-':5 N 1:,~: :.-', ,, /':, ',:: i,,i :i": () 5',::: :::::('~ 8000 6E:'70 ,, 1 !;> ,':,8():3, i 'F' 45 :_:::5 I',1 '2', 0 E 0 5;:::~ :31 :B2 ,,//',0 N 1 i 5 ,, 0,'!- ~.J :31 ::'?0 ,, 1 !;> :ii:;:ii;C)O ';:"()82, ::30 7()2(). 8() 44 24 I'.! 4 ..... I'.') i-:i. :'::, 4'i;:' :]!::B42... ;:32 i"..J 90,. ,'-':i.:i!:; :.i ' :i; :'!:: .::i 0,. ':.:."ii;' ; ! AFi:(7 lEt AL F;:ii;K A i N C. FI:::; ;':::-';:'7 ( .c;E'f~: '1 1 PRUDHOE £uqY .: AL..ASKA ..... ../.:. - .... .j .....c.; p E.l...i R, ,,., = .,.4; i i NI:. NFl..i..::-(i!iL/.~i. iR-(,,F y T i,,.ii.:i' F:t~!iHPANV gNCFIORgGE ALA:E;KA VER]'ICAL g;ECTION F':ALCULATED ALOiqG CLO::;URE l::' ¢:'.'-", i'~ iF' 4 DATE OF SURVEY HAY 2i, i-'.:;,F-~q- · :: dE.!B:::;'NU~IBE:.B~ fti<~'BO'4" 40 C:' t'~:EL'EY:i':]Bi~i~ii-iiNG'. ELEV.,' =".. 62,, ()~; :.FT,'."'- ,:...: MEASURED VERT I CAL DEPTH DEPTH:. . :,'.q ~ (-:, () . .. ., .:.. :.. ':'. o700 88'.'1::, () ~"::,Z'," f" ............. ,._, _,.,.. I,l ,] '.-:;'00() 'il;' 1 () i? 2 ()0 'il;' :'ii: 00 : 'il;' ,-'i. ()() ':i> ?":i '.'"i ,i"SEVERI TY' '71 ._ &. :':: 0 7 () 9'.--' '-' C . .... · .:., J 4. 4 10 N 8 · 50 E 0 :~.' :.:: '722,':-,. 02 7.1. 64,02 44- 2 N E, · :i:O E O. ::::0 I"OI"AI- RECTAIt4CiL!L~R CO0!z,:D I NqR~lq:z'~eU Tt':t: lEA S.]:./i4E:S t': '"" :'..'::.?'.:::'::::: j~:?i':~; ' ! :3412. :2:0 N :E:2. '75 t4 :34 J. 0 ,, 4() ::.':481.5'5 N 74., '.::;uB W :i:,:it. 7'.:::,,. 77 '; ..... i..",'700 ·" 744:3.6'!;;' 7:381,6'.'-;" 42 .4:3 N 6, 50 E -':='--"~' ....I"7 .TL4 .'--', Fi 27 · _4:2 1A_. bL_~ ......2- ,.J..I-.,:-..~-~,~ ............ '-_ -_ . ......... ...... ~ 5,:i- 6.60 '2"q c,, 1 .'=~'7 75'29, ._ 7 4 _l N E 7,S/2, E,, 3 J. 7/_-,04, ;31 41 2.1. 1'4 ,'2,, -:..'r.~ E 774.1. r.'..':,4 '7,/-,79.. 64 4C.I 5?; .N /-,..1 "2 F{ (') 4::?, ............; ,:.-.: ::,. 3::: ;. ,.,,, '"' ":"" "':',':;.-.o ':":' ._,,-. "'"'"':' ":' i'4' ':':'"'!::;''' :' "" :[:' ?7 .............~l t.".':." iff -"~- ,c'"l ,~ I:.-' .~.~ .~"'1. """ · ' ....... ;' ~:','..:,' / ._., ::, / ,=,.z,.:,, .s 6 .1:3 iq 5. 0 E :..", ,' :::, · - ~ .. '.'. · ~~_ 7 9 _1_ 7 Z.,,!'..:~ · :_'E~3 ':':d7' N . /_-_,. l 0 i:--' '£, :-.':i: '.':l, E:: () /_.., 4 . /:-, 1 8002 ,, 61 :'::-:0 6 N 7, 5(-) E :3, 4:3 -, : · '-'=:i'-" '" '.2:. 75 8:1 ..... .-.....:.::i: " 8090.28 :2'7 22 I',1 r..::, 10 F'- ]. 0 C.'. ,:":, () .1. ()j...('!.O :I. 0200 J. () 2 :;ii: 5 i '.'.'.. ,.., .:.. ]......: .' ...., ~ .'..' ...':. : ! (-i '7 ,:.':.)0 J. 0 80 () :l. (')',::ii 2 !!.5 THE CAL..C:LiLATTFii'..I 'F:'t::;uqF':F:i'iliF;:EF:; ARE BASED Ii)iq THE U~.::~;E (iF" 'T't. ii::~:iF.]ii:7 -. . ARCO ALA.'::i;KA I NC. ilS; :3-27 (:SEiT: 11 PRUDHOE E~AY ALASKA ANCHORAGE ALASKA DATE OF' SLiF;:VEY NAY' 2'J.. dOB NLIMBER AK-BO-4()O;4.4 KELLY BLI.S;I-~ING ELEV. = OF'ERATOR-MCGU I RE ,::':,2.00 FT. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH ':<:' "~' DEPTH .I R JE VERT. I CAL' DEp:TH..,. TOTAL .'COORDINATES Mi~-'rvo :HT'._:;OUTN · ' EA:S,T,/WEST II I F: F:'E",RE'NC:E VERT I C:AL C!3RRF.:.C; T I J. 000 ' .." :,'-:': .:i ~ ."' '.'::":300 () 4000 500 () 6000 O. O0 -62. O0 O. O0 O. O0 '.:.~'.---¢'P. 'P'.:.? 'P37. 'P'P 0.11 N 3.03 W ...... · ......· .'--- -...-.~ "'0,'""4~' 'S"':'"'""'":'"'"""'":'";':'"""i%'/:i::::'" 'ff ..... 2 !.:.~x?~ 1 24- '""- '""" ~. :,¢~-..'-. 24· "'" AO' N. 2~;'. A4 W 3898.2/-, ':"-~':'4 26 483.66 N 144. ~.,:::' W .. ._1 I__I ._1 _1 i~ - . 4684.7A 4622.76 1(]R9._.. (")~._ N 2:36 ..-._'":'~, W 54:34. ?8 5:372. ?8 174'.:;'. 40 N 2/_-, 1 . :36 W 0. 0. () 1 0 ,, C) 1 ,.., ,, /,% i ":: 'i . 7z_l,.__ :315.24 ,;::... ,:::- (-)...? ....I C) ....I . 0.06 8.6'i;' ,D-9 '::,"7 ..L..~.'_ ~____.., __~ ........................ · ".71:3.50 2 4'F,. 78 l ANCHORAGE ALASKA ~ . D:::; :2:-:27 ('.::iEC 11 TION RIDE) COMPilTAT~fiN iTATD ';5 '." "~, ~ .,, ' ." ' ."'. '- '-..' .... '";:::.:'::: '"..Z.~.' ".-~.:'.:':': :.: .~:~.:: ?"~. '' H~ ~ ~ ~ '.: :':':: ~b;KA: .. '.". ..... · .::':.:: ?:~:'.' : ':~ .' ========================================== ::.':- ======== ======================= ========== :..~-~ . :.. F'AAF 6 DA]"E OF SI..IF:.'VE¥ MAY 2'J.... i?C:4 ' ,-iOB'"NUMBER AK-DO-40(.~4 ...... KELLY /-~USH i N(:i O P R'I'-:,' ~ T ri IR-:. M i:':igl FT'. INTERPOLATED VALLIES FOR EVEN 100 FEET OF SLIB-SEA DEPTH · ..::.}('~i::. ': ~x.' ~/.' -'!~: ~ '. ': ": '" ::'; :>'" I"-":- · ' :TRUE' ::-'":' ' ' ' ........ "::' : ": .............. '"' ':: ........ : .~;::-~::.. ..].:~,.::. .: .. RECTANGUL. AR 2. :'. BRD I NA'TES i'"li.~--..'~' VO L E~'i H ':' ':D'~B'T'H DEPTH NOR]"H/SOUTH [j~I[~]'/~iE:::.,'~" I.'.~ :[ F'F: ,.:'F:~i:::NCE 1162 · i :[ 62.00 1100.00 0.86 .':_:; 2. ::::2 W 12 ;:., 2 1262, 00 i :~i: 00 ,, () 0 I ~. :..~": ~:,.'-' .. ,:~'-' '-' "" '" ::::::::::::::::::::::::::::::::::::::::::::::::::::: . .::.. ,:.:,.:, .w :.':' ... '.:':/-i~;'~.-'.:: ::' 0'0 i :::~0'0: i:iO ................... -':. .-> ,:< . .. .......... . ............. .................... ..... . .~..1 .... . ..... ."--.' '::-'/~ W · :"i'4"'/",2, ©() 14,00~ O0 · . · 2~ 7~t'. S .. 2 'q"::W 1. if:':62 1562. <'~<] i ?i~"~q O0 2. "' "" · :3 00 W .................... ' ............. I' .l '~ ' · :i, 662 :t. 6<':,2, 0() 1600, O0 :2.54 S :B, 01 W :t. '?,':-, '::' 1 '? 62.0 () 17 () 0.00 2.59 S 2.5': )W 0 O. O0 -62. O0 O. O0 O. O0 ,i'.2 ,.':.2. O0 0. O0 O. 01 S O. 08 W ".:'o.-;" :P:-i:'7!i.::'::':w :'-. · '~.~?~.:, Ou ;~00~ OO 0.07 S 1. :B6 W 6'2 '"'::":2~:~:;'~'~ 00 30(:~. oo ' ' Q, 08 N 1, ';a~N 462 462.00 400, O0 O, 2'F~N 2, 38 W 56:2 562. O0 500. O0 0.77 N 2.76 W 662 /",~','2, nn /-,oo 0o ] :1 ':~ N '-' J '-' .... "" ' ~ ~": ':' ' . -' - ;~::.: ".;~:..-- ':. .... ............ ...... '~ ~'4 ...... o.~ ..4 ':F, '7 ..... ; ' ', ":"~,' "0' .' ~'''' "" ./..,,,~ ;' ..'' .: ~6.~ ...(.~0......: ' '70el"' "';'00 ................ ';';.'::' "':...'.'.:"'.:':.~:'.:':~':.': :::f":'.:"ii::::'".::.' .... ~/.-:' :.' "' '~:?"::"::'~,";:' ":.i:i: ...... m'>: ,-. - ".:',;-.. ;~'..'1'.4':,~ '.:::.':: '" .... ::::: ~' :' :'"~":":"~'~':":' ~ ::::~'"::;":";" ' '::J; '"::'~";'<~ e:":~J~::" :W' '- ..... . "~, ':' .:m:'~.'~':G~.:..~,....';"> :....', ::'..~, .;.:i,: ~ '.;:: ::;'_,X~:.. '::-~:~o.-':' ' ':~oo,. nn.... ........... ......:: '-"' n.:-;:'~:~.::'::~ ::~:::.,.::i...:..::.::. 10~ 2 1062, 00 100(}. O0 0~ 2~. S ..... :.2, iF:G?..W INTERPOLATED VALUES FOR EVEN 100 FEEl' f3F SLIB-:F.;EA DEPI'H ,.:!?:..: ~ MEAE:UF'FT.~ VERT I CAL VERT I CAL. RECTANGULAR I~.:li.'ll:lRD INA TES ML]-]" Vi:.] VF."~"i" jl L-.:l:':~l .... t ~'. c, :7:? ' · ·: ?.~. -.: f.) E: F'"I'H D E:F"I-H DEPTH. NOR TH/SOUTH EAST/WEs'; ]" D :f F- F- i.i~]::.:..,I:.....:.. N C E CORREC 'l"I ON ! 2:_:::62 2::::62. O0 2300. O0 :1. :2:. 44 N 12. :2:7 E (). 5?5 0.. 09 i :2462 .... "/'-' .... ,:.4 :,..:., O0 2400, O0 .t 6 .49 N 14 O0 E ,:"~ 61 0 ()6 ......,::,=v'-._, .: "",,::.,:.'=;._ ,:, ..... ...', O0 ~"::, .':-; c} o ......, O0 20 ,86 N 1327 E (), 7 '1 0 ,, .1. :1. · :.: :: ;.. : .............. , ....... ..., :.~ . , ,., ........ , .... :'i:.?~:.i!: :..: ::"... ,,'~ (::,.:.,.:, ~':;:.ilN: ::~::.~ ':t.:;;:....o?c!' ?:.. 5 . ..: o. ..... '27/-4 27/-,2 oo 2700,00 40:2:1 N 1 :.36 W 2 :.35 :1. :1.~-'' '~ ...... 2 ,: 0() : 2 E:,,.!., ,:i:, :2',.362, ()0 "2::a')O. O0 '. 57, :.20 N :I. 2, 7() W ;I. ,, :35 . 3G7:.:{:: :306.2, 00. EJ:J. 7'P :2, :1. 62" 0() 3.1. 00, O0 ::ii: !!50 !5:?:: 46, 2, 0 () :'-]: 400.00 :37:3t :2,,'.!:, 62 ;700 :.3 50 (). 0 C) :3600" O0 ARCO ALASKA INE:. D~'::.; 3-27 (:.3FC' ~:l .TION RIFF) Ai..ACKA · ANCHORAGE ALASKA INTERPOLATED VALUES FOR EVEN 100 FEET OF SLIB-SEA DEPTH MEA.:,UREL VERT, _...: DEF'fH'- :3844 3762.00 3700.00 410.55 N 124.75 W 82.08 I2.46 ':i!i:'F'58 ::.'.':862.00 3800.00 463 .. ~!:'_'-, N $3'F'. 14 W ?6.08 14. O0 4()74 :3':.?,<.,2.00 3'~'/00, O0 520. I7 N :.. I:~4_ .40 W i J. ~.'", :l. 1 16. (".~:::::.. 41 ?2 ..::!-0,.'.:,2, 00 4000, O0 .581.27 N 167, 75 W 1:30. :31 18.2() ........................ &:.}.'!_i :;;: ..... &. ;b.":-_':;2., .CZ() .......... ,:].~E~_.O 0 ..... ./.-,-:~ 7, O,_1_t~. _~ 82. ~,t_~!... i .~!(PZ, ,_5~ .... 20_-._:3.~1: ..................................................... 4436 42/-,';:.'. 0(.~ 420(). 00 71:-3 ';'~) N 192 '-' ......... ._-, 1 W 174. :2:2: 23.5 :-3 4565 4362, O0 4:300. O0 800.2'.~ N 203, i() W 203,, 64 2?. 4 i }::~ 4'?,.'.-':,'? .'~i-,:!:,,~.,::_-'.". 0('.; 4600, O0 106A. '::.J'~.) N 234. :':i J. [.,,l .3()7 ,, :.7.:::"~ :2',,'-':i-. :.'.:'7 !:.'~.:: ,~::.,- ":" ,..., :i..£.Z."i! ........... .":!:2~:::;::.~. OCL ....... __-_'I, 70(~. 0() I :l 5:i;..:~, · -.,'L .-':, ! - · - · : ..:,/.) ,:I-':~C",:~:. (..~(..~ 4.~(,~(,). (.)~..~ 1 ::::.::4, ' ,~.'~:' ,,.. .-.':.. ,.:. ·. 5;:!: i:;12:"i:ici :' ~[.Oi):'::Oo:::,:'"': .":' ..:., ,: ,- :::':":::'::': 57'6'~::' !:::;"::',$.,':::'. 0() 520(}. ()0 :L 5'iP6,52 N 262, :32 W ':-:i;'~"7. :i. 2 :}]2 .. :3:.:.?: ?::::::i ':': '::;';"~'::' ~!.:; :.}.", ,'.!:, ::.-i: ~".~(') F~:'~(')C), '00 .... "; ......" J"-I ~.~,.,'::,'::..:_'. F: r.) i,.i !'~i;j [':) ., '":'"'~ """' · ..................................... ._L. (.'.~::, "','- .~ ;::, '.::, 3 ;:~':, J. 'i ....... ~.~ .......... ~ ........ .;:.. ,.-:,, ~~~ ~ .............. ,:i:,O:':~,S 54-,::,:,/, (.)() ~:~14(')("~ O.C) 177:2:, · '" . . ............. W 574 ':.'~0 :34-. () 7 61 '70 !:::; :5,!',:2:. () () 55 () 0, 0 ~':) 1 F.: 6:2:.~":;'2 N '-":"' '. .... · ."._, e,, :;:":3 i,.,i ,':, ();iii: ,, 8:3 :34.54 ANCHORAGE ALA:3KA ARCO A L A:i;i;KA ]; i',lC, D F; :3- 27 ( :'i.:.: E C t .'1. PRUDHE~E DAY' I-ION R15E) C:F~MF'i ITATiON []ATE ;.-'.. - : · ...... MAy":22; : : ... . . - ... 1'..'.,, - . ,.:!OB: NItMBER At-:.':-BA~4('~,:]4. zi. KELLY BUSHtNG ELEV. = OF'ERATOR-MC;GtJ :[ i IqTERF'OLATED VALUES FOR EVEN 10£3 FEET OF F;UB--:5;EA DEPTH DEPTH 'Ti AL ' ' ........... VERTi :.AR' COORDINATES NO-TVD DEF'TH .. :.""" :.'.J:':- /L:;OUTH EA:E;T/WES]' . D.I FFERENCE P;/',62 00 5600 O0 1,-).=;.:, x.L':: Iq '"'.=;'.'.:.)8 . ................ · -' ._ 0 W 6,4- 3:31 5762.0() 57£~0. O0 2o4:::. 04 N ' 244 Pi':' ,: .... . .......... ............................... ? , ..~ - ........ W 677,84 -5;061:2~:~ '~Xi.'::;..:'::,!':?::'..:~:.i/5.aO::~!i;:t:.(~::~:?i!'i;:.:iii'?.~;i;i~i:!~:.'.~:2'.~::.3'3'2~;`I'''''']q ....... """"' ......... '~i"i"~'2;!~ .... ' ..... ' .......... '"' ...........,.-.:. · ~; ~/,, '"mi ::'.. ,' :~ ~,¢' ?"'"' ':`~ ''''':':` '* ~': :~':?~"'"'~"' . . ,..~:: .. W "':>;~ 2'. ..: ':z ' 2 ;:"~: .¢,:.~,.',0~:0~,~':':.": .'..::.',.': .",'~:' ':: 22z4 .... :"::' N "':'"',,:', .... , ,'~ ...~.. · .................... :..::.....,....:.~.:.:.~ .....:...-:. ......... .....::.....:.: :..:.::.:.:...... .... .....,..... ........ ,.;, .... z...,, ,:., ~ N 74:3 ,, 'l 8 · - · · ~-,"' .'.',- :' . ~'.';:":.: :.'::.:;'-.:'.tf::-: ~ '.";:' :'.;:'F~,' ;-' ":..':.,' . .... "" .AU6.a ,.OU. · .', .. '~¢.)00','.:0['~ :'.'. '....:...'u2.;4'i~-,: ? .: ~.] '::, '1 ,'::, -":,, ¢ (.,j ".,.',,.~ . -?.'::, -- ' ' , .. ' '" . .... n-~' ~ .~ Ii · .,. .... .~..~... ~ ¢ . .., ,.,/ ....! 6162.0() 6100.00 24. I 1. :-32 iq 206.80 W :""::2:2:. :30 6262. O0 6'--'( ..... ~ .)L3. C3 () ""'~ ..... ""' .,:..::, 0,:,. 8:3 N 1'92:. 95 W 86:3. ::.: 1 _ 72/..,7 6:362.00 6300. O0 260'.:.;'. 1 ::': N 180. ::..::7 W '::';'()5.49 :':' ..:'. :.': ." '.i..... ':' :'::"" :. .... ", ........ :'. h'n...::'.' -, , .,:, ?"" .:~...t:,.';5,."~ . ':',:......"..'i:::{~i~;..62, 00 6500,. O0 2:::: 15, 'F'4 .N · 154.17 W 994, :39 · ?7.6o "..:.':.': ::'.":, .~', ,",.- · , ............ , .- '¢: .... o...' .... ~.) e,¢-,~. ~.3~¢ '-'91'.-,' 19 tq ' .i4:I.'. 07 W tO3F,'., 72 VE:R"F i CAL CORR E:C T t 0 N :34.48 '. ::: ::, ,' :38, 5'7 :39.92 42.27 "" :" '"'~'"" '"" ' '" '4- 4..., 44 45 44..'.'34 PAGE" 62:: 0':)i FT, 7844. ,:.~,7,":,2. O0 6700. O0 302 i. 57 1'4 128. (:::2: W 10F:2,, 40 7988 6862. OC) &,:BOO. O0 :~;!28,..30.. N ... 11:6, ~,:%~ .... .""" · '~ {"" z' % ! ."-~ ".'" c:, .J...::, J ; :, :-' ~", ,.', ( ] ~ ) /.:, ':..-; (') ('), (3 (') .':,.-:, c,, -':, · _,~.,..4 ...... :, N 104. , ,.: .... , , .... ' --'-- , :' ,7 .......,:'. 'T , ", ,'t , ,, ,,,,.,, .... . .... , ......... ::;::.);..?::!i;.T::'?;.:.:.~:..': 7.::' :a?;, 7'n . : '.?.: ;.Tm,.t .';," i")ci ...... '7(:~A0':' i"i'0 ..... J '.:"~""'-'..:,.~:..."'"' ..... ?':" '.~a,. N" 92, :34 i 0 71 ,.':.,:2, O0 710(),. O0 34 i'9. '7.7 N " ,'-31, ""=':': ..... 77' 00 ~ 0 C) · ' -"" ..... · · ' ,::....., .',(..; 726:2. ()0 · .: ....... ~ ,._.:, I :l N'. '71. 8 ;:', 8 ::::: 7 ::ii: 62. () 0 '7:2:00. ("~ ("~ 3610. 'F',"-, iq 60. 0,.8 W. I i, 2,'.f...,,,. 29 19' W :I. :168 ,, 27 6 9 1,4 'l ".:,~"~;:: ,:::, c, '.;': 0 W i 24 8.77 .t 6 ~...J J. 2 :i.~::3 ,, 04 ._":; ._,":' W 1:32/-,. :7'_ 7 :2:8 . :24- (ii: 824 7462.00 7400, 00 370:3. .., '= ,..,':'"' N ._ o, o.z, k,I 1:36 '2, '?/-, AF,:C'r.] AL_A:!-2;KA INC. ANCHORAGE ALASKA . . I.]l~ :_:.:-";'"~ (F';::'": · ' ["~-.. "' F,-~ r-'r '!'::":" ';:-.pRUDHOE BAY: :-::i.::Y.,]' ALASKA DATE OF: SURVEY MA'¥' 2i-.. 't (] · -:-;.dOB.~ NUMBE:R ::' '-'"'ii .KEEL INTERPOLATED VALLIES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRLIE SUB=SEA TOTAL NEASURED VERTI CAL VERT ~ CAL ' RECTANGULAR 'C:OORD ]~ NA'I"ES MD-'I'VL'; VERT I CAL. --~~ D~ ~ '~ ~"i-:"' /F4r/i I -~ S' " -. ,--'-- ] r: ...... r.: q,'":"~,f .... · i . · ;:;'i;~6(} 7562. O0 7500. O0 37':7,'4. 11 N :39.75-" W .1. :3'F'::3. :2.::7 :3!:5. :31 ,:.-., (' ,.?, :. ..~.. / .-.~ .. _ . ....:.............. .! :':':;-~ . .......... · .... -, ., ~,.-:,-:: .... :,,-: .... ,...., ,-,-, ].:~i::.i?.:.]::....i.::.'?'~..i.v :' .'9:Z!,~,::? · . . . . ::':.'.-".:"-'. · ": . .2,. :.'.: .... ' .' ' . .:_ :~" ".~.".' "..~.:" '....' · ' .::"::,'::.': ::::.::':-." "".".,'~:'.'.~:!:k..:~'~::"i.'"t:~.': ':'-' '.."].i ".!. ¢-1".¢.:¢ ,"::~t~,.'.':':' ':':... ". :::,,,.'-';' ..~'~'::~ : 2 . · ' ";"'""~ '""/~' '-;( )/' 2 - (]('l '::'('lC'IF! ,",/*, -' .... - · ........... - '-' ..... -~'- .... .......................... . ~-"-' '$ ~. ,=:'.~. u,:: FI _l. 9 :q E i Pi 'R 4 ':>'7 i ':' :[ F. 9.36 E 1548.91 24.. ::3'~;' E i 5 ;':, 7'. 49 32~ 87 E ].57:3, 44. 40.33: E' '! .578.04 It''~I':[ __ CAi,.. ~.II...A'!] ON t:::'BOCEDLIRE:~; ~JS;E A L I IxtEP.,i:~ t NTF.::F:,',F:'Cd. AT :[ ON BE'I Wr..i [~:N ARF:O ALASKA INC. D.'_:.': :z-,'-27 ( SEC 11 ANCHORAGE ALA'.:;KA BATE OF SLIRVEY MAY' 2i? CO - ..:.. :,.~ '~;:.:..~... :": ,JOB": NLIMBER AK-BO~-,4?()4,~I, ' - -.. .... ".. ' !'~:~LY BUSH:~f:iG ELiEv,- = 6;'-':.', 00 'F;T. ~.,::..':,..i'.. :'OPERATOR-MC:Gu I R "E.L____. INTERPOLATED VALUES FOR SPECIAL SURVEY POINTS -, ~.,..i-, MEASURED · ~.:':~,.i.:': -. L]EP. TH ' ........ '2'] /-,!5 T OF:' .t,:'~?':?2 8641 16 857'? 16 4408 92 N 4._, E SAD ,:,./:,...,,=, 42 442'P...:,._, N 50,. 68 E GAS/r"IIL CON'~ACT I 0304 8720.42 '"" '='---' . '-' ''= , · ?:';:. ' '-' ': "' ' r ':~-'.' - · ?.:.:. ::.'.~. ::: .,.: ....'... ::.. :~ ...". :-:.:;[ .0 ¢,/. 4 : '":' "'" '~' '= ": '"" .... "::':"::'~"':'"" ':~-'*'' "' :;:,?.r' "'::" "" ' :' ':' !''?''' ' '":?':!' "" '"' '~ '" "'~'~?~":~":':':' ''?''':':' ''!': :"':: '~ ' ~':' '?''':''::'''''': ' :''~' '": ;":"" ''~ .:...:....t.' ..:'. ?.....: ,... ,- ,, · ,",'/,",8',",'~4.:'.-.'.'.."'".'.'.',~7"..~..,0~'."","'.'.' ............ ' ...... 44~6~"..~'i¢' 'N ...... . ' ""."."54'~"~,,'~,' E'. .... · T~ Il:- ZONE .:i:Z:. .,::,~,4..~, ..... ;,..:, .. ,.:.... ,:,.~.,:,./.:.,.,...~?~,.,:~:...:::-.....~..::. ?.,... 44..5¢;., .:,.t....:.N ..... . .... .: : ~.,~,~.,... ~ ~;~, E .. f dF ,~..~i...!E .': ;~: ..'.. v. "?::'; .... . .''' :.'...'?-'. ".-'4 s o :.::' ;. : .4 '.- ." N '".'..":'.:? E H,.-.,-r .':?::. '- 10627 !7'032.4.2 8'770.42 4511.07 N 68.03 E HOT :[0658 '7062.35 '~000. :2:5 451'.:). 01 N 6?. 53 E "i"C.~P ZONE lB 10,.'.::, 7'i;;' ?082.5'.-.:' 5'.~:' 4~ A..~ I 1.070C:, ~;':~.02, ,58. :E ..' SUR. VEY' DEPTH ]. ()71 :!. !~;' ]. :[ 3 ,, 45 905 I., 45 45:32, ::.'!:2. N '72, 1 :~ E BA:.:.'i;E sar) .i ,:"~'~'"7:':::':;' :l 7:.'..i: '":'".'" ':~ 'i_ ,'[ '1 2:~: ,.,I ,:~-,: ,-", ,-},,::;, ',7~!:; ,, 'i..,.'.~- ii~ l:::,I i iF:i.(::~Ai"" I.::' T:(;! ........ · - ,, .¢.....:, o · '1'.. I"l',:.'], . .. N , .............. ,, , :1. 0825 '? :2 2 ::.:.'~ ,, :'.'!:'7 5;' 161.37 4.5('.::,2, 54 N 7'7, ,'.'.'.,7 E 'T'r"iTAL [tEF']"H EIt::,; ;i: LL. ER HAI::I<ER ARCO ALASKA iNE:. DS :3-27 (SEC 11 TION RISE) '~-'.): DER I VED US I NO D I L DEPTHS AND :iE;F'ERR Y ,-- ,, ,'" i'; ...... ',- .'. · .--,L,,~I ;:,L i:-~VE'~ ~.l~.~, I..-.~ "~'"~"~'~'~'"~'~'~'""~ ...... ' .... ' . i"' , } . .. . .' -i ~' j'. .~1!i.:..i."i::. ..... .~...:~.-~-~-~.~.....-..~-,~.~,~.,~,~:,~ ~:=.~=~:':. ...... . ...... ....... ............ TVO .................... BKB SUB-SEA MEA;:,_IRED DEPTH BKB ...'......:.: .,.,:.... :~:~. ~4..1. ,:...~?~...:......~.....,~._, ;,. 9,..i./-,..~.. :. ..... ' ' :'.'.' . ...... ~.~':'. :. :.....' :,..~: ...' :"" "." ':'.""~F," :": >."":!'~:::::' ":',Z,~=.-,.'-.".." .i GAS:;/n IL ~'..-." :~: ...:.:.'::'::~~??.'::!::~:: .'.:..?.'.:.':'.:.:.: .:...?:..::~.~,:~,~...:..:2.:: ~:,~ ~.:.,.:, TOF' ZONE:7 3 10:774 ..... ~~ ..... ' ' " - 8788.04 8726.04 'i"H I CKNESS VERTICAL. N i T'H f:; i::: F"' , T'O t,,Ii"::LI~HEAO ( ORI G iN .... 71i:i~OF"'.::;L.. 21FWL ) . .. "l'f"lF' Zf'.:d',lE :.2 104.'_--:8 · FiOT. _ :: ':' 'r.i::::.:''. :T'c.F;' 'Zot',IE i B '>:'i:':::i ':" '-..: : 10658 : BHoE. SAD 10711 4408, 9';::' N 45 ', 6.'-"'~" 44,'].6, ":;":;'N 54.68E 44/:..2 ii 1~"~? .'~. i"t !:::18. :t. 5E ,'.!. 4i"...i 66 ,, 5'?F.-: 451 :i ,, ('~ '7.'~,! 6 :!-'..~. 0..7ii E 4 '= .... ..... i 9., (i I r~i ,!: '?, 4L=.i:.'ii::2 ~ ;'32i",1 72, 1 1 E 4. 548 ,, 'P':'..:' N 75. 14-E · ....... 4~562._,_::'.:',/1..bi_ '7"Z,_~.E .... 2) F.::C, IMF::'LITEF:;', t::'IROGF;,:AM -.- SPERRY SLIN THREE D IMEt',ISIOt',IAL IRADILIF-; OF' CLIF:~VA]'LIF;,:E-'.' ::.,..': . .--. :, ,- ,, .... :,:,.-. , ........ -'- .. - "~. :'-.': .:..~ t:~:.. F:. ~,::'.~!.:..:.. ~ '.=:.:,: ......................... ::.::',_: : ~T]",'::~ ,I,~ ,~ ,_~.. . . . . ._~ATEj_':i:!F:' :.-'.:.';t~!:';~'v'F..'y ~.-~."...~ ....... :.'i ',?',,'-., CONF'LI]'AT :[ ON DATE .......................... '-"'-'"-"-~'--~'"'-~'":~:'""'~' .... MA)L 22.., .1.'~.'::'34 ,..IL]D NI...II"iBEF:i.' At<-'BCt-..,::i.()044 KEL. LY Bi..t:i:;t--i'FI:i':.: F:'i t:::'~] ..... '.'", ............... · =' "' '=':---'--~--~- .... "" '.:..~_~'.';' ) i'" I ,, TRUE NORTH ARCO Alaska, Inc. Our Boss Gyroscopic Survey Job No.: AK-BO-40044 Well: DS 3-27(SECll T10N R15E) Prudhoe Bay Field North Slope, Alaska Survey Date: May 21, 1984 Operator: McGuire Scale: 1"=1000' I -1000. O0 10825 !40OO. O0 · 3000. O0 .2000.00 -1000.00 l_1000.00 HORIZONTAL PBOJECTION ARCO Alaska~ Inc. Our Boss Gyroscopic Survey Job ~o. AK-BO-40044 Well: DS 3-27(SECll T10N R15E) Prudhoe Bay .Field North Slope, Alaska Survey Date: May 21, 1984 Operator: McGuire Scale: 1"=2000' 0.00 2000.00 4000.00 6000.00 8000.00 iooooooo, 4563.20'@N0° 58'E ~ ~10~ I 2000. O0 4000. O0 6000. O0 VERTICAL PROJECT_ ON SuggeSted form to be inserted in each "Active" well folder to d~eck for timely compliance with our regulations. / - Operator~' Well N~ne and Num~gr Required Date Received Remarks Cemp letion Report Yes / Well History Yes Registered S~ey Plat ~1~ , Inclina~on S~ey ~C) Drill St~ Test RemUs ~d./l.m STATE OF ALASKA ALASKA( AND GAS CONSERVATION CO 'fISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. Drilling well [~X Workover operation [] 7. Permit No. 2. Name of operator ARCO Alaska, Inc. 84-62 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of Well 8t surface /I 780' FSL, 21' FEL, Sec.~O~, TION, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 62' RKB, Pad 28' 6. Lease Designation and Serial No. ADL ~ ~.~..'~ 8. APl Number 029-211 09 50-- 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. 3-27 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool For the Month of May ,19 84 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well ~ 1800 hfs, 05/03/84. Drld 17-1/2" hole to 2421'. Ran, cmt, & tstd 13-3/8" csg. Drld 12-1/4" hole to 10,225'. Ran, cmtd & tstd 9-5/8" csg. Drld 8-1/2" hole to 10,826'TD. OH logs. Ran, cmtd, & tstd 7" lnr. Displace well to brine. Ran CBL. Ran 5-1/2" compl assy. Inject returns into 9-5/8" x 13-3/8" annulus. Secured well & RR ~ 1750 hfs, 05/19/84. 13. Casing or liner run and quantities of cement, results of.pressure tests 20", 91.5#/ft, H-40, weld conductor set ~ 80'. Instld w/1850# Poleset. 13-3/8", 72.0#/ft, L-80, BTC csg w/FS ~ 2404'. Cmtd w/2000 sxs CS Ill 9-5/8" 47.0#/ft, L-80 w/FS ~ 10,203'. Cmtd w/500 sx Class "G" cmt. 7", 29.0#/ft, L-80 f/10,800' - 9902'. Cmtd w/300 sx Class "G" cmt. + 400 sxs CS II. 14. Coring resume and brief description 15. Logs run and depth where run DIL/BHCS/GR/SP f/10,826' LDT/CNL/GR/Cal f/10,826' CNL/GR f/10,826' - 2404'. CBL/GR f/10,772' - surf. - 10,195'. - 10,195'. RECEIVED .16. DST data, perforating data, shows of H2S, miscellaneous data JUN 2 1 ]984 Alaska 0il & Gas Cons. Commission Anchorage 17'1 herebycertifythatthef~7~gistrueandc°rrectt°thebest°fmY kn°wledge''~"""")__//~~ Area Dri ' ' i ~/~~ SIGNED /- ~--, ._ _ TITLE ng Engineer DATE NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filfd in duplicate/with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10404 J FI M / FI R 08 Submit in duplicate DS 3-27 DRILLING HISTORY NU 20" diverter. Spudded well @ 1800 hrs, 05/03/84. Drld 17-1/2" hole to 2421'. Ran 62 jts 13-3/8" 72#/ft, w/FS @ 2404'. Cmtd 13-3/8" csg w/2000 sxs CS III & 400 sxs CS II. ND 20" diverter. Instld 13-3/8" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 12-1/4" hole to 10,225'. Ran 260 jts 9-5/8" 47#, w/FS @ 10,203' Cmtd 9-5/8" csg w/500 sxs Class "G" cmt. Tstd csg to 3000 psi - ok. Drl~ FC & cmt. Tstd csg to 3000 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 8-1/2" hole to 10,826'TD. Ran DIL/BHCS/GR/SP f/10,826' - 10,195'; LDT/CNL/GR/Cal f/10,826' - 10,195' CNL/GR f/10,826' to surf. Ran 21 jts 7" 29#/ft f/10,800' - 9902' C~td 7" lnr w/300 sxs Class "G" cmt. Drilled cmt to 10,673'PBTD. Tstd inr lap to 3000 psi - ok. Displaced well to brine. Ran CBL f/10,772' to surface. Ran 5-1/2" completion assy w/tail @ 9931, pkr @ 9865', & SSSV @ 2219'. Tested hanger and packoffs to 5000 psi - ok. ND BOPE. NU tree & tstd to 5000 psi - ok. Displaced well to diesel. Inject returns into 9-5/8" x 13-3/8" annulus. Dropped ball & set pkr. Secured well and released rig @ 1750 hrs, 05/19/84. JMM/DH08' tw RECEIVED JUN2 11984. Gas Cons. commission Ancherag~ ARCO Alaska, Inc. Post Office Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 June ~14, 1984 Reference: ARCO Cased Hole Finals ~,- D.S. 1-21 5-4-84 ,-D.S. 1-25 5-26-84 ~D.S. 2-17 3-28-84 ~D.s. 3-13 5-21-84 ,-D.S. 3-27 5-18-84 .~D.So 4-1 5-6-84 ~D.S. 4-4 5-14-84 ~D.S. 5-8 ~-5-84 ~D.S. 6-4 5-30-84 ~DcS. 7-20 4-18-84 ~,D.S. 12-t6 5-20-84 ~D.S. 9-4 5-7-84 ~D.S. 7-25 4-22-84 ~D.S. 7-22 4-20-84 ~D.S. 12-18 6-1-84 .,~D. S. 12-23 5-19-84 -~D.S. 14-2 5-3-84 ~D.S. 14-25 5-18-84 ~'D.S. 14-32 5-20-84 ,-D.S. 14-34 6-5-84 ~,,D. S. 17-1 5-24-84 Epilog Spinner Log Spinner Log/Basket Flowmeter CFS / Sp inner ACBL/VDL/S igna t ure / GR Epilog CH CNL Epilog CP 1/TDT-M w/listing Sp inner PLS Epilog Spinner Spinner CPL/TDT-M w/listing ACBL/VDL/S ignature/GR Epilog CFS/Spinner CFS/Spinner CPL/TDT-M w/listing Collar/Perf Log ~ P~~lease sign and return the attached copy as receipt of data. Don't Forget Dad on his day! Run 2 5" DA Run ! 5" Camco Run 2 5" Camco Run ! 5" GO Run 1 5" DA Run 2 5" DA Run 1 5" GO Run 1 5" DA 5" Sch Run 1 5" Camco Run 1 5" DA Run 1 5" DA Run 1 5" Camco Run 1 5" Camco 5" Sch Run 1 5" DA Run 3 5" DA Run ! 5" GO Run 1 5" GO 5" Sch Run 1 5" GO Kelly McFar land ATO-1429F Trans. # 242 DISTRIBUTION Chevron D&M Drilling Exp. Services Ext. Exploration Exxon ~tty Marathon Mob i 1 Mobil E & P Phillips Prudhoe Bay Well Files R& D Carolyn Smith Sohio Slate of Alaska ARCO Alaska, Inc. Post Office Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 June 1, 1984 Reference: ARCO Open Hole Finals D.S. 3-27 5-15-84 5-15-84 5-15-84 5-15-84 5-15-84 5-15-84 . CPL/Cybe r look BHCS DIL/SFL LDT/CNL/GR (Raw) LDT/CNL/GR (Poro) GR through casing Run 1 5" Sch Run 1 2" & 5" Run 1 2" & 5" Run 1 5" Run 1 5" Run 1 5" j/P/~lease sign and return the attached copy as receipt of data. Have A Nice Day! Kelly McFarland ATO-1429F Trans. 9224 DISTRIBUTION ~evron D&M Drilling Exp. Services Ext. Exploration Exxon Getty Harathon Mob i 1 Mobil E & P Phillips ~aska 0il & Gas Co.s. Camm/u/on ' Anti]ara.ge Prudhoe Bay Well Files R& D Carolyn Smith Sohio State of Alaska ARCO Alaska, Post O, .~ Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 May 24, 1984 Reference: ARCO Magnetic Tapes ~D.S. 4-1 5- ~/b. S. 6-8?~ 5- ,-D.S. 7-14~/ 5- / D.S. 7-13/ 5- fD.S. 15-13~/ 5- /D.S. 7-19~' 5- /D.S. 5-12/ 5- /D. ,-j D. D' -/D 6-84 CN/MSN 18-84 CH/CNS 22-84 CH/CNS 22-84 CH/CNS 23-84 CH/CNS 18-84 CH/CNS 23-84 CH/CNS ~1965 w/listing #281781 w/listing ~281783 w/listing ~281782 w/listing ~252598 w/listing #281784 w/listing ~281788 w/liSting S. 9-26'' 4-18-84 OH #1946 w/listing S. 3-27 ~' 5-15-84 OH #69234 w/listing ---;-l~3~-3~4~~--8~,------~n-swe~ ~69198 w/listing ~ 12-21 4-29-84 OH #69188 w/listing -~D.S. 13-34~' 4-21-84 TDT Edit #69197 w/listing /D.S. 12-17~'' 4-22-84 TDT Lis ~69164 w/listing · -~-~.S~--1-2--~-~/---4-22.~.84 ....... Answer. #69165 w/listing ,/D.S. 7-11~'' 4-26-84 CH CNL ~69179 w/listing /D.S. 12-21~"4-29-84 RFT #69188 w/listing DA GO GO GO GO GO GO DA Ru Sc Ru Sc Ru Ru Ru Ru n 1 Sch h n 1 Sch h n 1 Sch n 1 Sch n 1 Sch n 1 Sch . .. it 1! II l! I! I! ARCO Alaska, Ind'''~ Post Offic~ ~ox 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 May 11, 1984 Mrs. Elaine Johnson State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Conductor As-Built Location Plat - DS 3 Wells 27-34 Dear Elaine: Enclosed is an as-built location plat for the subject wells. you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer GRU7/L41:tw Enclosure If Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany 71' 96'----- Well ?_7 weil 28 _- .Well 29 Wel _ Gyrc / ~ 751' Gyro 771' .796' 846' Well Well Well Well /5 /4 /~----~ U I LT WELL LOCATIONS N. OTE S I. Elevations are ARCO datum M.L.L.W. 2. All distances are grid. 3. ×,Y coordinates are Alaska State Plane, Zone 4. CERTIFICATE OF SURVEYOR ~ ~"EREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED · ~ P-~STICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT T'~'.S ~LAT REPRESENTS A LOCATION SURVEY MADE 8Y ME OR UNDER u'r Sd=ERViSION AHD ALL DIMENSIONS AND OTHER DETAILS ARE :~:ECT. :c~e ~ 5~rveyor Wr.,.L No. 27 Lat. 70° 13' 49.344',' Long. 148° 16' 41..390' WELL No. 28 Lat. 70© I$' 48.188" Long. 148°16' 40.664" WELL No. 29 Lat. 70° 1:5' 47.035" Long. 148° 16' $9.9:57" · WELL No. 30 _ Lat. 70°1:5'45.881" Long. 148°16' $9.?_C~" WELL No. :51 Lat. 70° 1:5' 46.095" Long. 148°16' 19.589" .WELL N'o. $2 Lat. 70° I$' 44.94[" Long. 148° 16' 18.865" WELL No. $:5 , ,,- Lat. 70° I$, 4:3.785,, _ Long. 148°16 18.1:56 EL. 2:8.72 Y 5, 9:56,820. X 71:5, ?-98.32 EL. 28.28 Y 5,956,70:5.42 X 71:5,$26.61 EL. 28.:50 Y 5, 936, 586.87 X 71:5, $54.96 EL. 28.29 Y 5,936,.470.$2 X 7 ! 5, $83.55 EL. 27.20 Y 5,936,511.24 X 714,057.70 EL. 27.65 Y 5, 9:56,394.63 X 714,086.01 EL. 27.89 Y 5, 9:56,277.89 X 714, I 14.38 WELL No. :54 EL. 27.75 _ Lat. 70°!$'42.6:5;~" Y 5,9:56,161.$7 Long. 148016' 17.411 X 714,142.62 GYRO LOCATIONS WEST GYI~O Lat. 70° !:5' 43.467" Y 5, 9:56,225.35 Long. 148° 16" $8.846" X 71:5, 40?..72 EAST GYRO Long. 148016 20.756 X 714,012.22 RECEIVED MAY .19&t Alaska 011 & Gas Cons. Corn~is$lort Anchorage DATE: 4-24 84 1SCALE: I" - : $00' CA'O: LMH JFLD- BK. 84-10, 84-tl DRILL SITE No. 5 WELLS 27, 28, 29, 30, 31, 32,33, 34 LOCATED IN PROTRACTED SECTION I I, TION, R 15E, U.M. ASSU I LT ARCO .Alaska, Inc. LH D. 6.,.~S~ OCIATE S MEMORANDUM TO: TtH~U: FROM: State of Alaska ALASKA OIL AND GAS CONSERVATION CO~IISSION C. ~~atterton Ch~ Lonnie C. Smith; Commissioner DATE: May 7, 1984 FILE NO: D.5I. 29 TELEPHONE NO: Edgar W. $ipple, Jr~'}- Petroleum Inspector ~k~~__~~- SUBJECT: Witness a BOPE Test on ARCO's DS 3-27, Sec. 10, T10N,R15E,~f, Permit iqo. 84-62, Rowan Rig 35. Fr!~y, May 4, 1984: I left ARCO's WSP 2, subject of another report~ and t~aveled to ARCO's DS 3-27, Rowan Rig 35, to witness a BOPE test. The drilling contractor was in the process of nippling lip. -The BOPE test commenced at 11:30 am and was concluded at 1:45 pm. There was one failure. There was hydraulic oil leaking around the blind ram door on the draw works side. I filled out the AOGCC BOPE inspection report which is attached to this report. In summary, I witnessed the BOPE test on ARCO's DS 3-27, Rowan Rig 35. Attachment: Mr. Henry Peterson called .this office on May 8, 1984 the hydraulic leak on the blind rams was repaired. 02-001A(R. ev. 10/79) .4/80 STA'FE OF' AI,ASKA ALAS?Ut OIL & GAS CO:;SUb:VATiON COHHISSION B.O.P.E. Inspection Report Date Operator, well 05 Location: Sec /~ Drilling Contractor Representative Pe rmi t # ~ 73~Casin9 Set Rig ~ ~% Representative Location, General Wel 1 Sign General Housekeeping Reserve pit Rig ACCUI%U L~%TO R S'YS T U:4 Full Charge Pressure ~3'D ps.ig Pressure After Closure ,/ ~.~-~ psig 200 psig Above Precharge Attained: ~) rain ~Tsec Full Charge Pr~sure,~tttaine~d: ~ mind, sec Cqntrols: Haster ~D ~~-~ ~~ ~z~/ Remote ~ Blinds switch cover~~ BOPE Stack Annular Preventer Pipe Rams Blind Rams Choke Line Valves H.C.R. Valve Kill Line Valves O W'~ Check Valve 0~.'f ',.,.-"~ 2_ -o Test Pres.~ure ~-00 0 ~00o [Kelly and Floor Safetv Valves Upper Kelly. ~'O/< Test Pressure Lower Kelly 6~/< ~'~ Test Pressure Ball Type O~&"'Test Pressure Inside BOP ~/f Test Pressure Choke t, lanifold 0/~-~est Pressure !~:o. valves / 5/ operated choke. Test Results: Failures / ~%=-~"i%J~'- ..... ~-'=hr~_ /~ Repair or Replacement of failed equipment to be made within '~~a~' Ins~ctor/Com~ssion office notified. Distribution orig' - AO&GCC c~c - Operator cc - Supervisor April 19, 1984 Mr. T. L. Fi thian Area Drilling Engineer ARCO Alaska, Inc. P, O. Box 100360 Anchorage, Alaska 99510 Re: Prudhoe Bay Unit DS 3-27 ARCO Alaska, Inc. Permit No. 84-62 Sur. Loc. 777'FSL, 2'FEL, Sec. 10, T10N, R15E, UM. Btmhole Loc. 279'FSL, 0'FEL, Sec. 3, T10N, R15E, UM. Dear Mr. Fithian: Enclosed is the approved application for permit to drill the above referenced well. If coring is conducted, a one cubic inch chip from each foot of recovered core is required. Samples of well cuttings and a mud log are not required. A continuous directional survey is required as per 20 AAC 25.050(b)(5). If available, a t~pe containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of amadromous fish. Operations in these areas are subject to AS 16.05.870 and the regulations promulgated thereunder (T~tle 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title !8, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to · · ' ~ r~presentative commencing operatlons you may De contracted by a _ the Department of Environmental C°nservation~ To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention Mr. T. L. Ftthia_ Prudhoe Bay Unit DS 3-9_7 -2- April 19, 1984 equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. C. V. Ch-~tter~on' Chairman of BY ORDER OF THE COMMISSION Alaska Oil and Gas Conservation Commission be Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. .Department of Environmental Conservation w/o encl. ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 Apri! 17, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT- DS 3-27 Dear Mr. Chatterton' Enclosed is our application for Permit to Drill DS 3-27 and the required $100 filing fee. Attachments to the application include plats detailing the section and plan views of the proposed wellbore; proximity plats showing the subject wellbore's position to the nearest well drilled; a sketch and description of the BOP equipment; and a sketch and description of the surface hole diverter system. Since we anticipate spudding this well on April 21, 1984, your earliest approval will be appreciated. If you have any questions, please call me at 263-4610. Sincerely, T. L. Fithian Area Dril ling Engineer TFL/JG'tw GRU7/L01 Enclosures RECEIVED APR. 1 81BSq 0il & Bas Cons. g~m~tl~!0r, ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ?'", STATE OF ALASKA ,~-', ALASKA O,- AND GAS CONSERVATION COk..CllSSlON PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL E~X REDRILL [] DEEPEN [] 1 b. Type of well EXPLORATORY [] DEVELOPMENT OIL [] DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC SINGLE ZONE [] MULTIPLE ZONE [~.~,~ 9. Unit or lease name Prudhoe Bay Unit 2. Name of operator ARCO Alaska, Inc. 3. Address P. 0, Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 777' FSL, 2' FEL, $ec,10, T10N, R15E, UN At top of proposed producing interval Target @: 0' FNL, 0' FEL, Sec.10, T10N, R15E, UM At total depth 279' FSL, 0' FEL, Sec.3, T10N, R15E, UM 10. Well number 3-27 11. Field and pool Prudhoe Bay Fi eld Prudhoe Bay 0il Pool 5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial 62' RKB, PAD 28' ADL L~ .1,~',~,7,.7 12. Bond information (see 20 AAC 25.025) Federal Insurance Company Type Statewide Surety and/or number #8088-26-27 Amount $500,000 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed 3 mi. NE of Deadhorse miles 2' ~ surface feet 3-2 well @ 4735'TVD, 112' feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date 10829' MD, 9198'TVD feet 2560 04/21/84 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures 3378 psig@ Surface KICK OFF POINT 2500 feet. MAXIMUM HOLE ANGLE 39 o (see 20AAC25.035 (c) (2) ~psig@ 919R ft. TD (TVD) 21 Proposed Casing, Liner and Cementing Program SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT Hole I Casing Weight ~0- I 20" 91.5# 17-1/2" 13-3/8"I 72.0# i12-1/4"I 9-5/8-| 47.0# I 9-5/8" t 13-3/8" 29.0# 8-1/2"I 7" / Grade Coupling H-40 Weld L-80 I BTC L-80 ~ BTC Arctic P~ck 22. Describe proposed program: Length MD TOP TVD 0,067' 80' 36' I 36' 2464' 36' I 36' I 33' 1042 ' 33' 9800' I 8399' I M D BOTTOM TV D 116' I 116' 2500' Ii 2500' 10100'I 8632' I 10842' 119208' (include stage data) 2000# Poleset 2300sx CSIII & 400sx CS I 500sx Class G & 300 sx CS I ~00 sx Class G ARCO Alaska, Inc., proposes to drill this well to 10,842'MD (9208' TVD) to produce from the Sadlerochit zone. Logs will be run across selected intervals. A surface diverter will be installed and operationally tested prior to spud. A 13-5/8", 5000 psi, RSRRA BOP stack will be installed and tested. The annular preventer will be tested to 3000 psi and rams tested to 5000 psi. The BOP equipment will be pressure tested each week and operationally tested each trip. A string of 5-1/2", 17#, L-80 tubing and packer will be run. The packer will be set above the Sadlerochit. Provisions for subsurface safety equipment will be run. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A Sundry Notice will be submitted when the well is to be perforated. DS 3-27 will be 112' away from DS 3-2 @ 4735' TVD. It is also 120' away from DS 3-26 at the surface. Reserve pit fluids will be disposed of down the 9-5/8" x 13-3/8" annulus of this well. The 9-5/8" x 13-3/8" annulus will be left with a non-freezing fluid during any interruption in the disposal process (i.e.; rig move, shutdown of disposal process for an extended period fo time). 23. I hereby certify that the foregoi~ng is true and correct to the best of my knowledge SIGNED "'~.X. ¢~~,~ TITLE Area Drilling Engineer The space below for Commission use DATE CONDITIONS OF APPROVAL Samples required ~]YES Permit number Form 10-401 '"~'~'I~U7/Frl:)01 Mud Icg required I Directional Survey required I--lYES [~O I ~YES []NO I Approval date IAPl number SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE April 19, 1984 by order of the Commission Submit in triplicate N DS3-27 2O0O 3000 4000 5000 6000 7000 8000 9000 I0000 11000 AI~d~'~ Al A~~ ~ 0 ~FIqL~O ~FEL,SIO ,TION,R15E , , ~OP ~O ~ 2SQC ~.~ 13-3/8' ~SIHG ~ --2~00 .. 17.5 27,5 ~2.5 ~7.5 EOC TV~ --38~ MD-40~2 OEP--S12 4~O~ T AR ~ET) , 10 TVO -- 7372 ~lO - 84~ DEP - 3284 K~5 TVO - 7972 MD ~ 921i0 OEP - 3781 2-~/B' CASING ~0 ~ 8~2 MD ~ 10100 OEP ~ 431~ TOP SA~LEROQHIT TVD ~ 8a42 iMD ~ 10112 0EP~ 4324 - OlW C~NTACT TV0 -- 80~2 MD -- 108~2 DEP - ~ TVD = 8208 MQ -- 108~2 DEP -- 4783 ' I 0 1000 000 3000 4000 5000 6000 0 7000 0 1000 2000 3000 4000 0 1000 2000 :3000 4000 5000 6000 VERTiCaL SECTION SOOO 6000 > 7000 8000 9000 10000 11000 7000 D$~-27 E - IN COOROINPITES ' co -3000 -2000 -1000 O lO00 2000 3000 4000 I 777' FSL,2' FEL,S 10, T10N, RI 5E ,Ut,4 rosE, , ,, · Target Tm 8862' ~ 10,3~6' DEP 5280N i ! ! i i ! i ! i i ~ i ! ! i ! ! i i i ! i 0 L~ -3000 -2000- -1000 0 1000 2000 3000 4000 W I Z E - kl OOORDINPITES D83-2..7' E - N COORD-INFITES o-300 -200 -' 3 0 tO0 "200 300 I I I I I I I I I I I II I I I I I I I I I I I I I I I I i '"' AR(;O ALASi(,A, INC. " .... ? .~ ,i"'.~L~ 1 I1~ ~ I00 F-fL ": -- - -' '4788 :':: : . :: , ' _. , 4672. · · · _ . "44;59 ,i ' 4£84 4090 [.i(!SlV[ b Alasl',~ t211 & t~..,.$ (;0us t, oi,~mlt:Slor, ! - I i i i ! t i , i , , [ , i , i i i J i i i i I i i i i -500 -200 -1-00 0 1 O0 200 5or 400 CD CD DS3-27 ~' I~ - ~ COOROINRT~3 -300 -200 - !00 0 100 200 300 400 -Z c~ '"' ARC ~ 0 ALAS?[A;_ INC. ? " '- 3-27 3895 -- 3814 ' 3731 · 3558 3377 2996 3-26 AlaS,:a Oil &-Gas Con~ -300- -200 - O0 0 100 200 300 400 E - FI COORDINRT£S DSS-Z7 E - kl COORDINRTES Z o -3000 -2000 -1000 0 1000 2000 3000 4000 0 I -3000 -2000 -1000 0 1000 2000 3000 4000 E - ki COOROINflTES. IRNNULRR PREVE. NTOR PIPE RRM$ BLIND RRM$ ILLIN~ SPOOL PI'PE RRM$ 13-5/8" BOP STACK DIAGRAM Accumulator Capacity. Test 1. Check and fill accumulator reservoir to proper level with hydraulic fluid. 2. Assure that accumulator pressure is 3000 psi with 1500 psi downstream of the regulator. 3. Observe time, then close all units simultaneously and record the time and pressure remaining after all units are closed with charging pump off. 4. Record on IADC report. (The acceptable lower limit is 4S seconds closing time and 1200 psi remaining pressure, 13-5/8" BOP Stack Test 1. Fill BOP stack and .manifold with a non-freezing liquid. 2. Check that all hold down screws are fully retracted. Mark running joint with predetermined plug seating depth. Run test plug on drill pipe and seat in wellhead. Run in lock down screws. 3. Close annular preventer and upstream valves. 4. Functionally test chokes. -S. -In each of the following tests, first hold a 2S0 psi low pressure test for a minimum of 3 minutes, then test at the high pressure,. 6. Increase pressure to 3000 psi and hold for a mimimum of 3 minutes. Bleed pressure to zero. 7. Open annular preventer and close top set of pipe rams. Increase pressure to SO00 psi and hold for at least 3 minutes. Bleed pressure to zero. 8. Close valves directly upstream of chokes and open chokes.. Increase pressure to S000 psi and hold for at least 3 minutes. Bleed pressure to zero. 9. Open top set of pipe rams then close bottom set of pipe rams. Increase pressure to S000 psi below the bottom set of pipe rams and hold for at least 3 min- utes. Test reamining untested manifold valves (if any) with 5000 psi upstream of valve and zero pressure downstream. Bleed pressure to zero. Open bottom set of pipe Back off running joint and pull out of hole. Close blind r~ms and test to 5000 -psi for at least 3 minutes. BIeed pressure off ail equipment. Open bIind rams. Make sure mar~£oid and Iines are fuli of non- freezing liquid and all valves are set in drilling position. Test standpipe valves to S000 psi. Test Kelly cocks and inside BOP to SO00 psi with Koomey pump. Check operation of Degasser. Record test information on blowout preventer test form. Sign and send to Drilling Supervisor. Perform complete BOPE test once a week and func- tionally operate BOPE daily. 11. 12. 13. 14. 15. i6. 17. 18. Revised 2/21/84 SURFACE HOLE D IVERTER SYSTEM ARCO ALASKA INC'. SCHEMATIC I0" HYD. OPR. BALL VALVE WELL BORE (SEE DETAIL) IO" HYD. <:)PR. BALL VALVE ALL 90" TURNS ARE "TEE" CUSHION RESERVE PIT AREA NOTE' FL(A INE DR ILL ING RISER 20" 2O0O PSI WP ANNULAR PREVENTOR ~10" DIVERTER LINE Valves on diverter lines open a. utomati- cally when the annular preventer is closed. -- DR ILL ING SPOOL 20" CONDUCTOR PIPE I 0" HYDRAULIC OPERATED BALL VALVES "DETAIL" 20260102 CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. ITEM APPROVE DATE (1) Fee c~,?>~_. U' f~. f~7 Loc (2 thru 8) (3) Admin c~. ,. ~.~.~/ (9' thru 11) (4) Cas~ (12 thru 20)' (21 thru 24) YES 1. Is the permzt fee attached .......................................... 2. Is well to be.located in a defined pool ............................. 3 .................... Is well located proper distance from property line / 4. Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is well bore plat included ... 7. Is operator the only affected party ................... ' 8. Can. permit be approved before ten-day wait ........................... e 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. NO REMARKS Does operator have a bond in force ~ eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee~eff,~. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is conductor string provided ...................................... Is enough cement used to circulate on conductor and surface Will cement tie in surface and intermediate or production strings . Will cement cover all known productive horizons ................... Will surface casing protect fresh water zones ........ Will all casing give adequate safety in collapse, tension and burst Is this well to be kicked off from an existing wellbore ........... Is old wellbore abandonment procedure included on 10-403 .......... Is adequate well bore separation proposed .......................... Is a diverter system required ..................................... ~7_~I! Are necessary diagrams of diverter and BOP equipment ;ttacfied .. Does BOPE have sufficient pressure rating - Test to .~z~'~-O psig Does the choke manifold comply w/API RP-53 (Feb.78) .................. Additional requirements .. ............................................ Additional Remarks: o ~z mm Geology: Eng,ineering: EW. WVA~ JKT'~~HJH //~T// JAL c~-x_.MTM ~'''' ~,,. ~ ~ ~ rev: 12/08/83 6.CKLT INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE , , , . %: c ' ,, ~, Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXl .. No 'special'effort has been made to chronologically organize this category of information. .o Copyright 1987,1988,1989,1990,1991 By WESTERN ATLAS INTERNATIONAL, INC. Ail rights reserved. PROGRAM: TAPESCAN REVISION: 2.58 Start of execution: Thu 24 OCT 91 8:46a Tape Subfile 1 is type: LIS ~/ **** REEL HEADER **** '~/~ 91/10/24 01 i~lOV 'i ?.'. **** TAPE HEADER **** 0 Oil,.x Gas Cons. Cornmissio~ Anchorage 91/10/24 01 Tape Subfile: 1 Minimum record length: Maximum record length: 2 records... 132 bytes 132 bytes Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 3-27 500292110900 ARCO ALASKA INC. ATLAS WIRELINE SERVICES 24-OCT-91 89812 R. IORIO J. DETHLEFS 10 10N 15E 777 2 62.00 61.00 28.00 OPEN HOLE CASING DRILLER' S CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 9.625 10203.0 3RD STRING 7.000 10817.0 PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: BCS PBU CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH EQUIVALENT UNSHIFTED DEPTH 47.00 29.00 $ REMARKS: NO DEPTH SHIFTS REQUIRED. ON DEPTH WITH OPEN HOLE. **** FILE HEADER **** .001 1024 FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE STA~RT DEPTH STOP DEPTH PDK 10057.0 10433.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: SGMA PASS NUMBER: 1 EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ REMARKS: CN WN FN COUN STAT NO DEPTH SHIFTS REQUIRED. ON DEPTH WITH OPEN HOLE. $ : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units BIF PDK 68 1 BKL PDK 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 00 201 24 1 4 39 705 61 6 3 BKS PDK 68 1 CPS 4 CSLS PDK 68 1 CU 5 GRCH PDK 68 1 GAPI 6 LS PDK 68 1 CPS 7 MSD PDK 68 1 8 PHI PDK 68 1 PU 9 RATO PDK 68 1 10 RBOR PDK 68 1 11 RICS PDK 68 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 1 CU 15 SS PDK 68 1 CPS 4 74 169 61 4 00 201 24 4 06 511 09 4 71 162 89 4 00 201 24 4 00 201 24 4 23 260 40 4 23 260 40 4 23 260 40 4 23 260 40 4 96 761 61 4 00 201 24 4 05 626 89 60 * DATA RECORD (TYPE# 0) Total Data Records: 55 966 BYTES * Tape File Start Depth = 10460.000000 Tape File End Depth = 10050.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 13137 datums Tape Subfile: 2 138 records... Minimum record length: Maximum record length: 62 bYtes 966 bytes Tape Subfile 3 is type: LIS **** FILE HEADER **** .002 1024 FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FiLE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH PDK 10062.0 10446.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: SGMA PASS NUMBER: 1 BASELINE DEPTH REMARKS: CN WN FN COUN STAT EQUIVALENT UNSHIFTED DEPTH : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units 1 BIF PDK 68 1 2 BKL PDK 68 1 CPS 3 BKS PDK 68 1 CPS 4 CSLS PDK 68 1 CU 5 GRCH GR 68 1 GAPI 6 LS PDK 68 1 CPS 7 MSD PDK 68 1 8 PHI PDK 68 1 PU 9 RATO PDK 68 1 10 RBOR PDK 68 1 11 RICS PDK 68 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 1 CU 15 SS PDK 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 00 201 24 1 4 21 990 60 6 4 71 162 89 6 4 00 201 24 1 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 05 626 89 6 60 * DATA RECORD (TYPE~ 0) Total Data Records: 52 966 BYTES * Tape File Start Depth ' 10446.000000 Tape File End Depth = 10062.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 12305 datums Tape Subfile: 3 82 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 4 is type: LIS **** FILE HEADER **** .003 1024 FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH PDK 10066.0 10442.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: SGMA PASS NUMBER- 1 BASELINE DEPTH EQUIVALENT UNSHIFTED DEPTH $ REMARKS ' CN WN FN COUN STAT : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units 1 BIF PDK 68 1 2 BKL PDK 68 1 CPS 3 BKS PDK 68 1 CPS 4 CSLS PDK 68 1 CU 5 GRCH GR 68 1 GAPI 6 LS PDK 68 1 CPS 7 MSD PDK 68 1 8 PHI PDK 68 1 PU 9 RATO PDK 68 1 10 RBOR PDK 68 1 11 RICS PDK 68 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 1 CU 15 SS PDK 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 00 201 24 1 4 21 990 60 6 4 71 162 89 6 4 00 201 24 1 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 05 626 89 6 60 * DATA RECORD (TYPE# 0) Total Data Records: 51 966 BYTES * Tape File Start Depth = 10442.000000 Tape File End Depth = 10066.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 25186 datums Tape Subfile: 4 Minimum record length: Maximum record length: 81 records... 62 bytes 966 bytes Tape Subfile 5 is type: LIS **** FILE HEADER **** · 004 1024 FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS PDK $ REMARKS: CN WN FN COUN STAT 1, 2, 3 : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 13 Name Tool Code Samples Units BIF PNAV 68 1 BKL PNAV 68 1 CPS BKS PNAV 68 1 CPS CSLS PNAV 68 1 CU GRCH PNAV 68 1 GAPI LS PNAV 68 1 CPS MSD PNAV 68 1 PHI PNAV 68 1 PU RATO PNAV 68 1 RBOR PNAV 68 1 RICS PNAV 68 1 RIN PNAV 68 1 SGMA PNAV 68 1 CU API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 4 4 4 4 4 4 4 4 4 4 4 4 71 784 90 5 4 32 280 53 0 4 97 816 53 0 4 71 784 90 5 4 16 470 06 1 4 00 823 25 0 4 71 784 90 5 4 71 784 90 5 4 99 720 75 1 4 99 720 75 1 4 99 720 75 1 4 99 720 75 1 4 75 224 53 0 14 SGMB PNAV 68 1 CU 15 SS PDK 68 1 CPS * DATA RECORD (TYPE# 0) Total Data Records: 51 966 BYTES * 4 71 784 90 4 05 626 89 60 Tape File Start Depth = 10433.000000 Tape File End Depth = 10057.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 24354 datums Tape Subfile: 5 72 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 6 is type: LIS **** FILE HEADER **** .005 1024 FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH PDK 10057.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): 10433.0 13-JUL-91 FSYS256 REV:G002 VER:2.0 1443 13-JUL-91 10774.0 10455.0 10100.0 10442.0 960.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PDK $ PULSED DECAY LOG 2725 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 0.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G) : SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: PUMP IN 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): NORMALIZATION WINDOW START DEPTH (FT): STOP DEPTH (FT): AMOUNT: GAS SCALING FACTOR FOR NEAR AND FAR COUNTS: MULTIPLIER: TOOL STANDOFF (IN): REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA THERMAL SANDSTONE 0.00 0.000 0.0 0.0 0.0 0.000 0.000 0.0 ONE DEPTH PER FRAME Tape depth ID: F 23 Curves: Name Tool Code Samples Units 1 BIF PDK 68 1 2 BKL PDK 68 1 CPS 3 BKS PDK 68 1 CPS 4 CCL PDK 68 1 5 CSLS PDK 68 1 CU 6 CSS PDK 68 1 GAPI 7 G1 PDK 68 1 CPS 8 G2 PDK 68 1 CPS 9 GElS PDK 68 1 CPS 10 GR PDK 68 1 GAPI 11 ISS PDK 68 1 CPS 12 LS PDK 68 1 CPS 13 MON PDK 68 1 CPS 14 MSD PDK 68 1 15 PHI PDK 68 1 PU 16 RATO PDK 68 1 17 RBOR PDK 68 1 18 RICS PDK 68 1 19 RIN PDK 68 1 20 SGMA PDK 68 1 CU 21 SGMB PDK 68 1 CU 22 SPD 68 1 F/MN API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 74 169 61 6 4 06 511 09 0 4 00 201 24 1 4 71 162 89 6 4 32 125 68 0 4 00 201 24 1 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 59 553 77 6 23 SS PDK 68 1 CPS * DATA RECORD (TYPE~ 0) Total Data Records: 151 966 BYTES * 05 626 89 92 Tape File Start Depth = 10433.000000 Tape File End Depth = 10057.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 61307 datums Tape Subfile: 6 223 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 7 is type: LIS **** FILE HEADER **** .006 1024 FILE HEADER FILE NL~BER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH PDK 10062.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10446.0 13-JUL-91 FSYS256 REV:G002 VER:2.0 1505 13-JUL-91 10774.0 10455.0 10100.0 10442.0 960.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PDK $ PULSED DECAY LOG 2725 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 0.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: PUMP IN 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): NORMALIZATION WINDOW START DEPTH (FT): STOP DEPTH (FT): AMOUNT: GAS SCALING FACTOR FOR NEAR AND FAR COUNTS: MULTIPLIER: TOOL STANDOFF (IN) : REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA THERMAL SANDSTONE 0.00 0.000 0.0 0.0 0.0 0.000 0.000 0.0 ONE DEPTH PER FRAME Tape depth ID: F 23 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Name Tool Code Samples Units BIF PDK 68 1 BKL PDK 68 1 CPS BKS PDK 68 1 CPS CCL PDK 68 1 CSLS PDK 68 1 CU CSS PDK 68 1 GAPI G1 PDK 68 1 CPS G2 PDK 68 1 CPS GElS PDK 68 1 CPS GR PDK 68 1 GAPI ISS PDK 68 1 CPS LS PDK 68 1 CPS MON PDK 68 1 CPS MSD PDK 68 1 PHI PDK 68 1 PU RATO PDK 68 1 RBOR PDK 68 1 RICS PDK 68 1 RIN PDK 68 1 SGMA PDK 68 1 CU SGMB PDK 68 1 CU SPD 68 1 F/MN API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 74 169 61 6 4 06 511 09 0 4 00 201 24 1 4 71 162 89 6 4 32 125 68 0 4 00 201 24 1 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 59 553 77 6 23 SS PDK 68 1 CPS * DATA RECORD (TYPE# 0) Total Data Records: 154 966 BYTES * 4 05 626 89 92 Tape File Start Depth = 10446.000000 Tape File End Depth = 10062.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 61243 datums Tape Subfile: 7 226 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 8 is type: LIS **** FILE HEADER **** .007 1024 FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 #- FILE SUMMARY VENDOR TOOL CODE START DEPTH PDK 10066.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL. (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10442.0 13-JUL-91 FSYS256 REV:G002 VER:2.0 1526 13-JUL-91 10774.0 10455.0 10100.0 10442.0 960.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PDK $ PULSED DECAY LOG 2725 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 0.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: . FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: PUMP IN 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): NORMALIZATION WINDOW START DEPTH (FT): STOP DEPTH (FT): AMOUNT: GAS SCALING FACTOR FOR NEAR AND FAR COUNTS: MULTIPLIER: TOOL STANDOFF (IN): REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA THERMAL SANDSTONE 0.00 0.000 0.0 0.0 0.0 0.000 0.000 0.0 ONE DEPTH PER FRAME Tape depth ID: F 23 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Name Tool Code Samples Units BIF PDK 68 1 BKL PDK 68 1 CPS BKS PDK 68 1 CPS CCL PDK 68 1 CSLS PDK 68 1 CU CSS PDK 68 1 GAPI G1 PDK 68 1 CPS G2 PDK 68 1 CPS GElS PDK 68 1 CPS GR PDK 68 1 GAPI ISS PDK 68 1 CPS LS PDK 68 1 CPS MON PDK 68 1 CPS MSD PDK 68 1 PHI PDK 68 1 PU RATO PDK 68 1 RBOR PDK 68 1 RICS PDK 68 1 RIN PDK 68 1 SGMA PDK 68 1 CU SGMB PDK 68 1 CU SPD 68 1 F/MN API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 74 169 61 6 4 06 511 09 0 4 00 201 24 1 4 71 162 89 6 4 32 125 68 0 4 00 201 24 1 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 59 553 77 6 23 SS PDK 68 1 CPS 4 05 626 89 92 * DATA RECORD (TYPE# 0) Total Data Records: 151 966 BYTES * Tape File Start Depth = 10442.000000 Tape File End Depth = 10066.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decOding summary: Rep Code: 68 97428 datums TaPe Subfile: 8 223 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 9 is type: LIS **** TAPE TRAILER **** 91/10/24 01 **** REEL TRAILER **** 91/10/24 01 'rape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 24 OCT 91 8:47a Elapsed execution time = 39.93 seconds. SYSTEM RETURN CODE = 0 Copyright 1987,1988,1989,1990,1991 By WESTERN ATLAS INTERNATIONAL, INC. Ail rights reserved. PROGRAM: TAPESCAN REVISION: 2.58 Start of execution: Thu 24 OCT 91 8:46a Tape Subfile 1 is type: LIS **** REEL HF~ADER **** 91/10/24 01 **** TAPE HEADER **** 91/10/24 01 Tape Subfile- 1 Minimum record length: Maximum record length: 2 records... 132 bytes 132 bytes Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 3-27 500292110900 ARCO ALASKA INC. ATLAS WIRELINE SERVICES 24-OCT-91 89812 R. IORIO J. DETHLEFS 10 i0N 15E 777 2 62.00 61.00 28.00 OPEN HOLE CASING DRILLER' S CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 9.625 10203.0 47.00 3RD STRING 7.000 10817.0 29.00 PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: BCS PBU CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH -- EQUIVALENT UNSHIFTED DEPTH $ REMARKS: NO DEPTH SHIFTS REQUIRED. ON DEPTH WITH OPEN HOLE. $ **** FILE HEADER **** .001 1024 FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH PDK 10057.0 10433.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: SGMA PASS NUMBER: 1 BASELINE DEPTH -- EQUIVALENT UNSHIFTED DEPTH $ # REMARKS: CN WN FN COUN' STAT NO DEPTH SHIFTS REQUIRED. ON DEPTH WITH OPEN HOLE. $ : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units 1 BIF PDK 68 1 2 BKL PDK 68 1 CPS 3 BKS PDK 68 1 CPS 4 CSLS PDK 68 1 CU 5 GRCH PDK 68 1 GAPI 6 LS PDK 68 1 CPS 7 MSD PDK 68 1 8 PHI PDK 68 1 PU 9 RATO PDK 68 1 10 RBOR PDK 68 1 11 RICS PDK 68 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 1 CU 15 SS PDK 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 00 201 24 1 4 06 511 09 0 4 71 162 89 6 4 00 201 24 1 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 05 626 89 6 60 * DATA RECORD (TYPE# 0) Total Data Records: 55 966 BYTES * Tape File Start Depth = 10460.000000 Tape File End Depth = 10050.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code' 68 13137 datums Tape Subfile: 2 138 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 3 is type: LIS **** FILE HEADER **** .002 1024 FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH PDK 10062.0 10446.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: SGMA PASS NUMBER: 1 BASELINE DEPTH EQUIVALENT UNSHIFTED DEPTH $ REMARKS · CN WN FN COUN STAT : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units 1 BIF PDK 68 1 2 BKL PDK 68 1 CPS 3 BKS PDK 68 1 CPS 4 CSLS PDK 68 1 CU 5 GRCH GR 68 1 GAPI 6 LS PDK 68 1 CPS 7 MSD PDK 68 1 8 PHI PDK 68 1 PU 9 RATO PDK 68 1 10 RBOR PDK 68 1 11 RICS PDK 68 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 1 CU 15 SS PDK 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 00 201 24 1 4 21 990 60 6 4 71 162 89 6 4 00 201 24 1 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 05 626 89 6 60 DATA RECORD (TYPE# 0) Total Data Records: 52 966 BYTES * Tape File Start Depth = 10446.000000 Tape File End Depth = 10062.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code- 68 12305 datums Tape Subfile: 3 82 records... Minimum record length' Maximum record length: 62 bytes 966 bytes Tape Subfile 4 is type: LIS **** FILE HEADER **** .003 1024 FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH PDK 10066.0 10442.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: SGMA PASS NUMBER: 1 EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units 1 BIF PDK 68 1 2 BKL PDK 68 1 CPS 3 BKS PDK 68 1 CPS 4 CSLS PDK 68 1 CU 5 GRCH GR 68 1 GAPI 6 LS PDK 68 1 CPS 7 MSD PDK 68 1 8 PHI PDK 68 1 PU 9 RATO PDK 68 1 10 RBOR PDK 68 1 11 RICS PDK 68 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 1 CU 15 SS PDK 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 00 201 24 1 4 21 990 60 6 4 71 162 89 6 4 00 201 24 1 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 05 626 89 6 60 * DATA RECORD (TYPE# 0) Total Data Records: 51 966 BYTES * Tape File Start Depth = 10442.000000 Tape File End Depth = 10066.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 25186 datums Tape Subfile: 4 81 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 5 is type: LIS **** FILE HEADER **** .004 1024 FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS PDK $ REMARKS: CN WN FN COUN STAT 1, 2, 3 : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod BIF PNAV 68 1 BKL PNAV 68 1 CPS BKS PNAV 68 1 CPS CSLS PNAV 68 1 CU GRCH PNAV 68 1 GAPI LS PNAV 68 1 CPS MSD PNAV 68 1 PHI PNAV 68 1 PU 4 71 784 90 5 4 32 280 53 0 4 97 816 53 0 4 71 784 90 5 4 16 470 06 1 4 00 823 25 0 4 71 784 90 5 4 71 784 90 5 9 RATO PNAV 68 1 4 10 RBOR PNAV 68 1 4 11 RICS PNAV 68 1 4 12 RIN PNAV 68 1 4 13 SGMA PNAV 68 1 CU 4 14 SGMB PNAV 68 1 CU 4 15 'SS PDK 68 1 CPS 4 * DATA RECORD (TYPE# 0) Total Data Records: 51 966 BYTES * Tape File Start Depth = 10433.000000 Tape File End Depth = 10057.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 24354 datums Tape Subfile' 5 72 records... Minimum record length' Maximum record length: 62 bytes 966 bytes 4 99 720 75 4 99 720 75 4 99 720 75 4 99 720 75 4 75 224 53 4 71 784 90 4 05 626 89 60 Tape Subfile 6 is type: LIS **** FILE HEADER **** .005 1024 FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH PDK 10057.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10433.0 13-JUL-91 FSYS256 REV:G002 VER:2.0 1443 13-JUL-91 10774.0 10455.0 10100.0 10442.0 960.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PULSED DECAY LOG $ TOOL NUMBER 2725 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 0.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): PUMP IN 0.00 0.0 0.0 FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): NORMALIZATION WINDOW START DEPTH (FT): STOP DEPTH (FT): AMOUNT: GAS SCALING FACTOR FOR NEAR AND FAR COUNTS: MULTIPLIER: TOOL STANDOFF (IN) : REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA 0 0.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 0.000 0.0 0.0 0.0 0.000 0.000 0.0 ONE DEPTH PER FRAME Tape depth ID: F 23 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 Name Tool Code Samples Units BIF PDK 68 1 BKL PDK 68 1 CPS BKS PDK 68 1 CPS CCL PDK 68 1 CSLS PDK 68 1 CU CSS PDK 68 1 GAPI G1 PDK 68 1 CPS G2 PDK 68 1 CPS GElS PDK 68 1 CPS GR PDK 68 1 GAPI ISS PDK 68 1 CPS LS PDK 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 74 169 61 6 4 06 511 09 0 4 00 201 24 1 4 71 162 89 6 13 MON PDK 68 1 CPS 14 MSD PDK 68 1 15 PHI PDK 68 1 PU 16 RATO PDK 68 1 17 RBOR PDK 68 1 18 RICS PDK 68 1 19 RIN PDK 68 1 20 SGMA PDK 68 1 CU 21 SGMB PDK 68 1 CU 22 SPD 68 1 F/MN 23 SS PDK 68 1 CPS * DATA RECORD (TYPE# 0) Total Data Records: 151 966 BYTES * 4 32 125 68 4 00 201 24 4 00 201 24 4 23 260 40 4 23 260 40 4 23 260 40 4 23 260 40 4 96 761 61 4 00 201 24 4 59 553 77 4 05 626 89 92 Tape File Start Depth = 10433.000000 Tape File End Depth = 10057.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LISirepresentation code decoding summary: Rep Code: 68 61307 datums Tape Subfile: 6 223 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 7 is type: LIS **** FILE HEADER **** .006 1024 FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH PDK 10062.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT)' TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10446.0 13-JUL-91 FSYS256 REV:G002 VER:2.0 1505 13-JUL-91 10774.0 10455.0 10100.0 10442.0 960.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PULSED DECAY LOG $ TOOL NUMBER 2725 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT) : 0.000 0.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): PUMP IN 0.00 0.0 0.0 FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): NORM_ALI ZATION WINDOW START DEPTH (FT): STOP DEPTH (FT) : AMOUNT: GAS SCALING FACTOR FOR NEAR AND FAR COUNTS: MULTIPLIER: TOOL STANDOFF (IN): REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA 0 0.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 0.000 0.0 0.0 0.0 0.000 0.000 0.0 ONE DEPTH PER FRAME rape depth ID: F 23 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 Name Tool Code Samples Units BIF PDK 68 1 BKL PDK 68 1 CPS BKS PDK 68 1 CPS CCL PDK 68 1 CSLS PDK 68 1 CU CSS PDK 68 1 GAPI G1 PDK 68 1 CPS G2 PDK 68 1 CPS GElS PDK 68 1 CPS GR PDK 68 1 GAPI ISS PDK 68 1 CPS LS PDK 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 74 169 61 6 4 06 511 09 0 4 00 201 24 1 4 71 162 89 6 13 MON PDK 68 1 CPS 14 MSD PDK 68 1 15 PHI PDK 68 1 PU 16 RATO PDK 68 1 17 RBOR PDK 68 1 18 RICS PDK 68 1 19 RIN PDK 68 1 20 SGMA PDK 68 1 CU 21 SGMB PDK 68 1 CU 22 SPD 68 1 F/MN 23 SS PDK 68 1 CPS * DATA RECORD (TYPE# 0) Total Data Records: 154 966 BYTES * 4 32 125 68 4 00 201 24 4 00 201 24 4 23 260 40 4 23 260 40 4 23 260 40 4 23 260 40 4 96 761 61 4 00 201 24 4 59 553 77 4 05 626 89 92 Tape File Start Depth = 10446.000000 Tape File End Depth = 10062.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 61243 datums Tape Subfile: 7 226 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 8 is type: LIS **** FILE HEADER **** .007 1024 FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE S~Y VENDOR TOOL CODE START DEPTH STOP DEPTH PDK 10066.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PULSED DECAY LOG $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): 10442.0 13-JUL-91 FSYS256 REV:G002 VER:2.0 1526 13-JUL-91 10774.0 10455.0 10100.0 10442.0 960.0 YES TOOL NUMBER 2725 0.000 0.0 0.0 PUMP IN 0.00 0.0 0.0 FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): NORMALIZATION WINDOW START DEPTH (FT): STOP DEPTH (FT): AMOUNT: GAS SCALING FACTOR FOR NEAR AND FAR COUNTS: MULTIPLIER: TOOL STANDOFF (IN) : REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 3-27 : PRUDHOE BAY : N. SLOPE : ALASKA 0 0.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 0.000 0.0 0.0 0.0 0.000 0.000 0.0 ONE DEPTH PER FRAME Tape depth ID' F 23 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 Name Tool Code Samples units BIF PDK 68 1 BKL PDK 68 1 CPS BKS PDK 68 1 CPS CCL PDK 68 1 CSLS PDK 68 1 CU CSS PDK 68 1 GAPI G1 PDK 68 1 CPS G2 PDK 68 1 CPS GElS PDK 68 1 CPS GR PDK 68 1 GAPI ISS PDK 68 1 CPS LS PDK 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 74 169 61 6 4 06 511 09 0 4 00 201 24 1 4 71 162 89 6 13 MON PDK 68 1 CPS 14 MSD PDK 68 1 15 PHI PDK 68 1 PU 16 RATO PDK 68 1 17 RBOR PDK 68 1 18 RICS PDK 68 1 19 RIN PDK 68 1 20 SGMA PDK 68 1 CU 21 SGMB PDK 68 1 CU 22 SPD 68 1 F/MN 23 SS PDK 68 1 CPS 4 32 125 68 4 00 201 24 4 00 201 24 4 23 260 40 4 23 260 40 4 23 260 40 4 23 260 40 4 96 761 61 4 00 201 24 4 59 553 77 4 05 626 89 92 * DATA RECORD (TYPE# 0) Total Data Records: 151 966 BYTES * Tape File Start Depth = 10442.000000 Tape File End Depth = 10066.000000 Tape File Level Spacing = 0.250000 Tape File DePth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 97428 datums Tape Subfile: 8 223 records... Minimum record length- Maximum record length: 62 bytes 966 bytes Tape Subfile 9 is type: LIS **** TAPE TRAILER **** 91/10/24 01 **** REEL TRAILER **** 91/10/24 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 24 OCT 91 8:47a Elapsed execution time = 39.93 seconds. SYSTEM RETURN CODE = 0 * ALASKA COMPUTING CENTER * , , ****************************** *------- SCHLUMBERGER -------* ******************************** COMPANY N~Mg : ARCO ~[,ABKA, =INC. WELL NAME : D.S. 3~27 FIELD NAME : P~UDHOE BAY BOROUGH : NORTH SLOPE STATE : AhASKA API NUMBER : 50-029-21t09 REFERE..ICE NO : 73888 u-olsm, mtuo9 'suo9 se9 '~' I!0 066L 0 Z NRP o TaDe Verification blstlnq ~-hl, umberoer AlaSKa Computing Center 1-JUN-lggo t5{06 **** REEL HEADER **** SERVICE NAME : EDIT DATE : 901061 1 ORIGIN : FL, IC REEL NAME : 738~8 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA, iNC,, PRUDHOE 0AY~ D,$, ]"27, API ~50'029"21109 **** TAPE HEADER **** SERVICE NAME : EDIT DATE ORIGIN : FDIC TAPE NAME : 73888 CONTINUATION # PREVIOUS TAPE COMMENT : ARC£) ALASKA, INC,, P~UDHOE BAY, D.S. 3-27, API #50-029-21109 **** FILE HEADER **** FILE NA~E : ED/T SERVICE ~ FLIC VERSION : 001, A04 DATE : 90/061 ~,AX REC SIZE : 1024 FILE TYPE : bO bAST FILE : :PAGE: .1 ******************************************************************************** ******************************************************************************* ** ** ** SCHLUMBERGER WELL SERVICES ** ** ** ******************************************************************************* COMPANY NA~E: ARCD ALASKA, INC. BGR~UGH: NORTH SLODE STATE: ALASKA LOCATION: 777' FSL g 2' FEL SECTION: !0 TGWNSHIP: RANGE: 1SE PEPNANENT DATUM: MSb ELEVATION: 0 Tape Veri~lcat,l~on Listing ;hlumberger !as~a ComPut ng Center 1-jUN-1990 15606 LOG ME,~SUR~D FROM RKB 62 ABOVE PERMANENT DATU~ ELEVATIONS KB: 62 DF: 61 G5: 28 DATE LOGGED: TD DRILLER: TD LOGGER: 24-~AY-1990 10736 10728 CASING ],: CASING 2: TUBING: TAIbPIPE: g 5/8" 47 b.B 8 DRILLER DEPT~ OF 0 'TO 10203 7" 29 LB 8 DRILLER OEPTH OF 3650 TO 10817 3 1/2" 9,.3 LB a DRILbE DEPTH OF 7497 9821 BIT SIZE 1: ~[2 1/4" BIT SIZE 2: 8 1/2" TYPE FLUID IN HOLE: CRUDE TIME LOGGER ON BOTTOM: 17:.I0 ~4-MAY LOGGING DISTRiCT~ PRUDMOE BAY LOGGING ENGINEER: PORTER WITNESS: MORRIS TOOL NUMBERS: CAb-UB 381 CNT-D 101 ATM-AA 283 ATC-CB 1163 mSR-LA 3039 FIELD RE~ARKS: CORRELATED TO BHC SONIC 9F 15-~AY-84 OPEN Pf]RFS: 1.0270-10282 & 10290-1031.8' HIG~ COUNTS ON GA~A RAY C~RRESPOND TO OPEN O~ SQUEEZED OFF PERFORATIONS LOGGED AFTER PU~PING: 400 BBL$ C~UDE OIL 50 BOLS DIESEL, 5 BBLS ~ETHONAL D~TE JOB STARTED: 01-OUN-90 dO~ DEFERENCe; NO: 73888 LDP/A~A: KOH~ING ****************************************************************************** , * FILE - EDIT,O01 , * ARCO ALASKA, INC, * PRUDHOE BAY * ] 27 , , I$ ?a~e VerifJ, c'ation Listin~ 1-JUN-1990 15:06 rhlumlber~er Alaska ComPutino C. ent. er : .... ~ ' - 5000 ..F,.,ET ATA SA~,~PLED F;,¥SRY , .ATA I I~.(,LUDED OOL EXTENSION TOOL YPE USED NA'~E I, P}'! HI,,,A HODGES LEY ANN A¥~RAGED NPHI 10723' TO 101'59" NT-,A/D/H .PS1 C[)~PE~SAT[D NEUTRON 10723' TO 10159, NT-A/D/H .PS2 COF~'PENSATED NEUTRON ~0723' TO 10~60'. NT-A/D/H .'PS3 CO~PENSATED NEOTPON 10723' TO 101,59' ************************************************************************** PAGE: 3 VALU ARC(,) ALASKA, INC, PRUDHO~ BAY D.S. 3-27 50'029~21109 F 777' FSL & 2' Eh A 0 62. 10723, 10~65, i?:10 24-~Y 0 ORTH SLOPE LASRA SA ORRIS 91.150 SL DEFX ~ellName API Serial Number, Field.Location Section .Township Range County State or Province Nation witness' Name Service Order Number Permanent datum Log ~easured From Bottom Lo Interval Top Log I~terval Time Logger At Bottom TABLE 'IYPE : CURV DEFI O~PT oep h channel amt N e NPHI Neutron Porosity NPHI Neutron Porosity CS Tape Verification 51sting :hlumberger Alaska Computi, Dg Center I-JUN-1990 15:06 DEFI TNRA Calibrated Thermal Netltron Ratio RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC GR Gamma Ray TENS Tens ion CCh CCh Amplitude NPHI NeutroD Porosity T~RA CalibratedTbermaA' Neutron Ratio RCNT RCNT RCFT RCFT C~T¢ CNTC CFTC CFTC GR Gamma Ray TENS Te~slon CCh CCL Am ,plltude NPH! NeUtron Porosity TNRA Calibrated Thermal }~eutron Ratio RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC GR Gamma Ray TENS Tension .CCL CC[,., Amplitude ** DATA FORNAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE R R CODE VALIjE 2 ~6 0 3 73 1,16 4 66 1 5 66 6 73 7 65 ~ 68 0,5 9 65 FT 11 66 8 12 68 1.3 66 0 1,4 65 F~ 15 66 6~ 16 66 1 0 66 0 Tape Verif.i..catlon Listing ;hl. omberger Alaska Computino Center I-JUN-1990 15:06 PAGE: N A ~ E: SET TYPE - CHAN ** DEPT NPHI HLA NPHI PS1 TNRA PS1 RCNT RCFT CNTC PS1 CFTC PSI GR PSi TENS PS1 CC5 PSi NPHIPS2 TNRA PS2 RCNT PS2 RCFT PS2 CNTC PS2 CFTC P$2 GR PS2 TEllS PS2 CCh NPHI PS3 TNRA PS] RCNT PS3 RCFT PS3 CNTC CFTC PS3 G~ PS3 TENS PS3 CCh P$3 SERV Li~IIT S~RVIC ID ORDER FT 391150 PU 391150 PU 391150 391150 CPS 391150 CPS CPS 1,1.50 CPS 391150 GAPI 391~50 LB 391150 V 391,150 PU 391150 391150 CPS 391150 CPS 391150 CPS 391150 CPS 391150 GAPI 391150 5B 391150 V 391150 PU 391150 391.1.50 CPS 391150 CPS ~9!150 CPS 391150 CPS ~911.50 GAPI 391150 bB 391150 V 391150 APl API LOG TYPE API APIF CLASS .MOD 'N O0 000 O0 0 O0 000 O0 0 42 890 O0 0 42 420 01 0 42 420 01 :0 42 420 01 0 42 420 01 0 42 420 01 0 42 31,0 01 0 42 635 21 0 42 150 01 0 42 8go O0 0 42 420 01 0 42 420 O1 0 49 420 O1 0 42 420 O1 O 42 420 O1 0 42 310 01 0 42 635 21, 0 42 150 Ol 0 42 890 O0 0 42 420 O1 0 42 420 O1 0 42 420 O1 0 42 420 O] 0 42 420 O1 0 42 310 O1 0 42 635 21 0 42 150 O1 0 bg NU~B NUMB SIZE REP MB SAMP ELE~ COD 1 I 1 4 1 1 1 4 I ,i I 4 1 1 1 4 I 1 1 4 1 1 1 4 1 1 1 4 I 1 I 4 I 1 1 4 1 1 1 4 i 1 I 4 1 1 1 4 1 I 1 4 I 1 I 4 1 1 1 4 1. 1 1 4 1 1 I 4 1 1 1 4 1 1 1 4 I i I 4 I 1 1 4 I I 1 4 I 1 1 4 1 1 1 4 1 1 I 4 1 1 1 4 1 1 I 4 I I i 4 R PROCESS E CHEX) 68 OOOO000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 00000000.00 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 6B 0000000000 68 0000000000 6B 0000000000 6B 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 ** DATA DEPT. RCNT.PS1 G~.PS1 TNRA,PS2 CFTC.PS2 NPHI.PS3 CNTC.PS3 CC[..DS3 ~CNT.PS1 UR.PS1 TNRA.PS2 CFTC,PS2 10747,500 3064,242 55,719 '990,250 '999.250 '999,250 '999,250 '999,250 10700.000 3333,333 38,781 4,819 713,250 NDHI,IiLA RCFT,PSi TENS,PS1 RC6iT,PS2 UR,PS2 TNRA.PS3 CFTC.PS3 NPHI,HLA RCFY,PS1 TENS,PS1 RCNT,PS2 GR,PS2 '999,250 620,606 77,500 '999 250 -999~250 -999,250 -999,250 28.516 715,921 187,500 3300,000 33,594 NPHI.P51 CNTC,PS1 CCL,PS1 RCFT.PS2 TENS.PS2 RCNT,PS3 GR,PS3 NPHI,PS! CNTC,PS1 CCL,PS1 RCFT,PS2 TENS,PS2 31.284 TNRA,PS1 3186.399 CFTC.PS1 0.000 NPHI,PS2 -999 250 CNTC.PS2 -999' ,250 CCL,PS2 -999,250 RCFT.PS3 -999,250 TENS.PS3 27,972 TNRA.PS1 3466.268 CFTC.PS1 0.000 NPHI.PS2 733,333 CNTC,PS2 177,500 CCL,PS2 5,199 612.895 -999,250 -999,250 -999,250 -999.250 m999,250 4,795 713,005 28,166 3443,577 O,O00 :blumberger Alaska Corn NPHI, PS 3 29,889 CNTC. PS3 3466,228 CCh. PS3 0.000 peP?. lo6oo ooo RCNT,PS1 3910;733 OR. PS 1 29,969 CFTC. pS 2 955,905 NP~I,PS3 22,556 CNTC,PS3 4035,884 CCI,,PS3 0,000 DEPT, 10500.000 RCNT,PS1 3956.616 OR,PS1 20,,453 TNRA.P$2 4 CFTC,PS2 884:22 NPHI,PS3 28,900 CNTC,PS3 4045,630 CCI,,,,PS3 0.000 DEPT. RCNT*PS1 GR PS1 TNRA PS2 CFTC PS2 NPHI PS3 CNTC PS3 CCh DEPT. RCNT PS 1 OR:PS1 TNRA PS2 NPHI,PS3 CNTC.PS3 CCL.PS3 DEPT, RCNT,PS1 GP PS1 TNR~:PS2 CFTC,PS2 NPHI,PS3 CNTC,PS3 CCL,PS3 DEPT, RCNT.PS! G~,PS1 TNRA,PS2 CFTC,PS2 NPHI,PS] 10400,000 4352.815 1193,303 20.224 4538,198 0,000 1030(!,000 3300,000 72,625 4,759 656.514 27,547 3419.367 0.000 102o0.000 2652.497 43,313 4,688 559,969 27,713 2707,591 0,000 10158,500 1804,772 69,000 -999,250 -999.250 53.162 ist in.q putin~ Center TN'RA. PS3 C~TC,PS] MPHI,HbA RCFT,PS1 'TENS,PSi RCNT,P.$ G,R,PS2 TNRA.PS3 CFTC,PS3 NP}~I,HLA RCFT,PS1 TENS,PS1 RCNT,PS2 OR,PS2 TNRA,P$3 CFTC,PS3 NPHI. HhA RCFT, PS 1 TENS, PS,~ RCNT. PS GR PS2 1,, RA,PS3 CFTC. P.53 NPHI,HbA RCFT TENS:PSI RCNT,PS2 OR.PS2 TNRA,PS3 CFTC.PS3 biPHI.HhA RCFT,PS1 TENS,PS1 RCNT,PS2 GR.PS2 TNRA,PS3 CFTC.PS3 NPMI.HLA RCFT.PSI TENS.PS1 RCNT,PS2 GR.PS2 TNRA.PS3 i-JUN-ig90 15:06 5,~031 RC~T,PS3 691,4 (;~*PS3 2 3808 32 4 971 34~),0o0 ,531 461 NPHI,PS! 21,~71 345 CNTC.PS1 4015. i5 ~50 C[h. Ps~ o.ooo 14 RC~T'PS~ 1016'667 9~9 TENS,PS 177,~00 839 GR,PS3 34, 8 NPHI CNTC CCh PSi RCFT PS2 TENS,PS2 RCNT,P$3 OR,PS3 28.809 885,032 4150,000 .188 4 10 NPBi,PS! CNTC,P$1 CC5,'P81 RCFT,PS2 TENS,PS2 RCNT,PS3 OR,PS3 20,947 i o.ooo 433~'750 333 16'797 . 3 3 NPHi,PSI CNIC PSi CCL:PS1 RCFT PS2 TENS:PS2 RCNT,PS3 OR,PS3 27,246 697,1~1 177.5 0 32~0 606 90:750 4,742 66~,946 NPHI,PSI CNTC.PS1 CCh. PS1 RCFT.PS2 TENS.PS2 RCNT.PS3 UR.PS3 27,441 578,108 173 750 2553~191 42,656 4,763 546.19] NPHI.PS1 CNTC,PS1 CCI,.,PS1 RCFT.PS2 TFNS.PS2 RCNT,PS3 -999,250 255,048 173,750 '999,250 '999,250 7,686 29,838 4067~61! 0,'000 901,169 177,500 3956,616 54,906 21,981 4483,3~8 1~58,23 4352" 5 17,453 26 264 3406:~96 O, O0 697,131 ~73.750 3233.333 89,500 27,557 2741.692 0.000 578.108 173.125 2550,478 44,281 54,522 1934,083 0,000 99,250 1874.187 RCFT,PS3 TENS,PS3 CFTC.PS1 NPH'I..PS2 CNTC,PS2 RCfT,PS3 T~NS,PS3 TNRA,PS1 CFTC,PS! NPHI,PS2 CNTC,PS2 CCL,,P$2 RCFT.,PS3 TENS,PS3 TNRA,PS1 CFTC,PSI NPHI,P$~ CNTC,P82 CCh,PS2 RCFT,PS{ TENS.P$~ TNRA,PSI CFTC CNTC,PS2 CCh. PS2 RCFT.PS3 TENS.PS3 TNRA.PS1 CFTC.PS1 NPHI.PS2 CNTC.PS2 CCh. PS2 HCFT.PS3 TENS.PS3 TNRA.PS1 CFTC.PS1 ~]PHI,PS2 CNTC.PS2 CCh. PS2 RCFT,PS3 PAGE{ 700.000 1.75,625 4,018 981,978 9 o.ooo lOO~ o00 17 ~500 845 5 :27 671 408~ .I, 9~0 832 972 1,75 000 4,019 1134,~24 45 ,382 0,000 1224,229 174,375 4,580 69~,379 2 ,682 3311,890 0,000 172, 0 4.743 565.538 27.113 2712,146 0,000 561,105 171,875 7,842 244,027 -999,250 -999,250 -999,250 289,054 IS T:ame verl,,flcatiom Llst',!ng chlumbe,r, gerAlaska Computln~ Center C If P$3 1947 045 CFTC,PS3 CCh,PS3 0,000 1-jUN-1990 15:06 253.519 65.125 TENS.PS3 PAGE~ 170.625 $~RVICE : rbI:C V RSION = O01A04 DATE : 90/06/ MAX REC SIZE : 1024 FIbF TYPE : :50 5AST FILE : **** TAPE TRAISER SERVICE ~AME = EDIT DATE = 90/06/ 1 ORIGIN : FSIC TAPE N~NE : 73888 CONTINUATION # ~.~EVIOUS TAPE CO~ENT : ARCO ALASKA, INC., PRUD[i:OE BAY, D.$. 3-27, API #50-029-21~09 **** REEL TRAILE~ **** SERVICE NAME : EDIT DATE : 90/06/ 1 O~IGIN = FLIC REEL NA~E : 73888 CONTINUATION ~ : P~EVIOU$ REEL : CQMMENT : ARCO ALASKA, INC., PRUDHOE BAY, D.$. 3-27, API #50-029-21109 ~EV!$1ON: 5.~ PART Start of execution: ~i **** REEL L~$ ~/3!/!2 ATLAS 01 'LiS CUSTOHE;! LIBRARY JAN 29 .o-3~, T~PE ' -~** TAmE LTS ~8/31/12 366:3 01 HEADER **** 'BACKG~'OUND GAMMA R~Y Af'4D 3 PASS PDK-JO0' FILE fl I **~* FILE HEADEP, **** G/P, .001 1 0 2/-,. CN : ARCO ALASK~ WN : O.S. ~-~7 =N : PRUDHOE 5~Y COUN : NORTi4 SLOPE STAT : ALASKA iNC, rOR~4AT ecc.,~ (TYP=~ 64) ONE DEPTH P~R FqAME T&PE DEPTH UNIT C rjr V'= S- : NAM:E CO~E,.., SAt',,,mI., _E#. UNIT CCL 6*3 1 VOLT SmD ~,~ I FT ~YTES G2 GR MSD SGMA CS$ ISS qATO RICS RZN ~80R I CTS 4 1 CTS 4 1 APl 4 I CTS ~ I CTS 4 1 DIM 4 1 CTS 4 t CTS 4 1 CTS 4 I ~'TS 4 I DiM 4 I D?M 4 I mTN1 4 I DIM 4 O ~T .~ [)EPTH M SD 5KS (TYPE~. CCL ~1 S S G!.4 A R~TO O) 966 8YTFS * ,,-, eSS RTCS~. LS GR iSS RiN SS M ON SKL 10752.000 49.99501 6, P31 ~,¢,, n 39,995~? 0.0000000 9.9m9oo2 -5.859489 O.O00000O 28.9~710 ~9199101 e9.99301 1.000000 0.0000000 47.74905 69.90301 0.1068164E-03 ~0.99101 10118.99 119.9~$9 0,0090000 10712.0e0 20.a9801 ~.5~1n~'. 71 1$1n~ i "~ '-; 0.0000000 !74~35.S -2.099125 0.2015!79 3o.9959~ 1! .2410C 7,292000 0.3588964 42.&5301 43.0~767 ?.517000 0.226~280E-04 7481.852 3!.24800 0.5633645 10662,000 18.73190 32.5!973 3~,.17201 3:~5 ~999 2~31809,0 -213.7!47 0.778~3~30 39.69901 20,13300 18.9619~ 2.027302 26.6850 rj 28.1e077 38.43600 O. 292918F, E-03 21.03900 7495.926 34.84~01 1.07423~ 10612.000 24.9s901 43.29210 31 4~44.6 -10,389¢0 0.741 5475 39.~9599 17.14200 23.74101 1.269575 5,2.25301 35.e0466 30.14101 0.2437769E-03 39.m85o2 7502.g77 60.23592 1.351349 10562,000 170 07n~' 3.766343 1803.31~ 0 OnOOr"O 0 57~0! .2~ ! ,020069 ! .641721 40.27560 127.8120 142.3200 1 .6!1530 79.353~9 710.6418 229.3530 O. 64701 03E-O $ 140.8600 7401.035 1931.710 0.1945699 10512.000 53.51700 13.40707 17~?.!06 0.0000GO0 262249.5 -Z54,0314 019~5444~ 36 · I 5980 57.603~9 53.70699 5~.58095 416;2229 161.1~40 0.4751147E-03 56.83400 7883.391 1914.05~ 0.7599241 10~62.000 15.71709 n O00nO0~ ~1!45.75 36.19659 23.71100 5,4429~0 =0 5~41 2 5.7450,.)1 74 ~ 5.0 ~ .'.', 10412.000 15.70000 36. 744.9;~ 30.7_8001 Z12.5500 174948.1 -!80,5805 9.848R27 36. 93080 I 2.10400 15. . 1'~900.., 2.594887 O.c, ,..,.0001 21.04474 39.28400 0.1191509E-03 9.999001 771,5,645 7.3.20500 0. 9349093 1 0362 · 17.3~10! 7 · SS.SS101 ~05 349° i =4=3& 0 -4 5522~4 0.B380784 36.196~9 25.~9300 !6.71&00 I .3~196.,, 29. 28502 34.24431 25,43599 3.1657,~36E-03 24.50800 7916.328 54.94502 0.4616296 10312., u,' 23.10701 6.361521 231 401.5500 410355.9 -66.54863 0,6619501 36.23820 ~7.31500 23,94600 1,409004 20.48001 179.475e 33.74001 0.1732950E-03 15.Ci0900 7555.751 179.9230 1.0S5910 10P62.~00 38.45n01~ 14.66234 264.7500 O.O0000OO 285742.4 -7.685844 (3.2318665 36.97241 31 .30300 32. ~75 01 2.55?273 ~2.97499 Z0~.3024 82.53601 0.2628004E-03 15.42300 7708.016 19¢.0590 10.43574 10212.000 22.=.,,3501 4.433¢1 ~ $9.3380-3 I 01 62,000 9.99~ '" 0.49!951© I 09.9890 133.6500 294552.5 -1.70781) 1.703720 32,39999 99.9o001 31.78'748 O.O0000OO 36.63231 24,26700 21.11301 I .052335 36.99631 0.9900000 0.9000000 0.0090000 7.513001 43.58493 ;~2.21 SO0 0.1645731E-03 0.C000000 53,09752 0.0000000 0.000000O 13.25100 7762.637 90.96103 1.02~934 0.0000003 7255.273 16~.9830 2.500001 TOTAL D~.TA RECORDS : 103 STARTI~O,~ T^P~ ~ O=PTH. = 10762,..00 FiLE TR.~!LER ENDING T~PE DmPTH = 10146.00 FTL::: ~ ,_~ ~**~ FILF .... HEADER **** PASS1 .002 1024 FORMAT RECORD (TYPE¢ 64) ONE. [',=PTH,_ PEp.:, ~mAME: .,, TAPE DEPTH UNiT 1~ CUPVES : N~MF CODE SAMmLE# UHIT bYTES GJ GEJS G~ HSD S SMA CSS TSS ~KL SKS PiCS 68 68 _58 1 CTS 4 1 CTS ~ 1 CTS 4 I CTS 4 1 CTS 4 1 APT~. 4 1 CTS 4 ~'TS 4 I OIM 4 1 CTS 4 1 CTS 4 ! CTS ,4. ! CTS 4 I DIM 4 1 D! M 4 1 O I M 4 I DIM 4 O~T~ DEPTH 0! MSO 5KS RECORD (TYPE:~ CCL GElS r'- .. RATO O) 966 BYTES * SPD G2 CSS RICS LS !SS R!N SS MO.N BKL RBOR 10707.000 8329.16g 0.8279173 339.966! 10657.000 12399.48 0.2939728 166.7000 O,O000OOO 1~77A~ 2 ~ . .~ . - ~2. ~; 4346 21 .5315g 0.0000000 16.5~559 18.02167 I 5,99840 1059.806 2 ~'~- ~ 7 67 14.55S94 13.99860 4214.238 26323.04 17.59302 le19.839 25,16533 "~26 O 11.33023 21 85 17.65788 731486.6 10.45355 34746.53 10120,9:~ 59.99402 1.6o0344 30470.20 10161.78 47,99901 1.547260 10607.000 5673.512 0.3407685 228.8~50 O.OO00000 t45706.! 31.37347 23,04924 13.99860 897.2822 22418.62 15,~7934 142~.973 45.84633 349267.3 10,98o47 32937.63 10164.43 1 06.4010 1 .580140 10557.0~0 14731.27 0.5301160 22~~ ~ ~.~:,~00 133439,1 lc.02443 13.~9860 5041.266 23543.59 11.650~3 2732.768 957.6541 332556.( o.929699 43706.48 10163.95 2117.765 1.535664 10507.000 15375,21 0.8554~65E-01 2~8 c~~ 0,0000000 131783.5 15,8!216 15.75650 14.74250 5664.414 29453.61 11.19905 2849.91B 879.$716 329~57.3 9.568766 44994.46 10114.20 2393,561 1.477935 10457.000 12654,91 0,7720697 ~43,46¢1 0,0000000 160972,3 18,57585 !7.97505 13,9,~$60 .... 17 2~75 '?. 30 381 33 2456.578 173.3872 36~435o , 1 !0.04765 44170.03 10123.6~ 732,233g 1.§21695 t5297.01 ,_0.1743097 71~..9910 1303"--'", '~ 15.3~ _.34 16.05733 57t4.039 11 .22916 119.3107 3' .25.4 1L,.~1166 10019.22 549.65~9 1.4!$3692 10357.000 13007.33 0.1606533 715.6521 174.9000 131306.4 !6.64429 17.24741 t4.12520 c372.328 26733.96 12.17~34 2348.494 143.5600 775588.~ 10.689~3 40398.1 6 10148.8_9 516.67d0 I .562539 10307.000 1~113.04 9.45!9137 882.1028 79.199~.8 134E76.! 18.92816 1:B.13986 13.~9~60 3514.~00 26733.47 12.1~572 2275.L70 255.9462 326033.9 10.13604 41371.09 10151.49 725.2307 1.532040 10257.000 11866.14 0.~h81973 939.192~ 0.0000000 19.10797 Z0.12770 13.99860 3434.325 25851.27 12.~9834 lO~p ~93 267.0779 317927.6 10.c6557 40059.06 10115,45 714.664.3 1.541934 10207.000 6027.508 0.3787813 6P7. ~.~~ 0.0000000 13~803.1 3~ 7~52~ 24.23460 14.02840 1032.020 22249,59 13.8679~ 1389.575 t57.4597 308557.2 1 ,,r: · 58Z, 73 33606.17 10142.71 477.0002 1 .573911 10157.000 479.95_21 0.3639637 599.040_'2 O.O000OO0 30376.97 4~.54617 32.7647S 13.99~60 9.999002 406(~. 594 1 9 ~1 ~,2 169.~830 159.~395 79432.00 10.77882 556~.4~5 10137.98 479.9521 1.725156 TOTAL DATA RECORDS : 94 STARTING TAPE DEPTH = 10707.00 FILE TRAILER **** =NDING TAP=~ DEPTH 10147.00 FILE ~ 3 **** F~ *~ , ~LE HE¢4~R **** PASS ~.003 1024 FORMAT.RE""ORO,.., ('rYpE~, : 64) ONF-~ DEPTM PER: F-'RA.M=, ~ TAPE DEPTH UNiT : FT 19 CURVES : NAME CODE 1 ~ · ~C' 6~ 2 S~O 6a ~ l~ 6~ SAMPLE~ 1 1 1 UNIT VOLT CTS 5YTES GElS GR MON M S ~ SGMA CSS ZSS BKS r<ATO RICS RIN R8OR 68 68 68 68 68 6p- 68 I CTS & 1 CTS 4 1 API 4 1 CTS 4 I ~ ~TS 4 1 DIM 4 1 CTS 4 1 CTc 4 1 CTS 4 I CTS 4 1 DIM 4 u.~M 4 I D!~'~ 4 1 DIM 4 O~TA DEPTH M SD BKS (TYPE# CCL :~E1 S SGM 'A RATO O) BYTES * SPD CSS RICS LS GR ISS RIN SS MON BKL RBOR 10707.000 1409,860 0.2319769 469,953t O,O0000CO 146425.4 26,39632 20.10347 12,99570 1609.860 23~7,61 14,44852 1779,822 30.32748 3465h5.4 11,08475 35846.41 10121 .99 89.99101 1 .606758 10657,000 310~ ~ "'" 0,37!746~ 245,825~ O,OOO60CO 139330,6 t9.30853 !9.7695o 1 '~ · 99860 ~1ul E. 2,! 25803,59 I 2 ?;5n~6 1967.222 23.76416 331598.4 11.02867 38909.12 10163.12 76.646,33 1.570533 1 0607. go0 1058.667 248.1070 1~696 ~ 36697 22.9726t 14.67170 1058.667 23349.24 14.53160 1409,10~ 39,9~330 330301,~ 11,22345 34441 10128.58 107.3380 1 ,656142 10=57 O00 ~986.715 0.34E8769 2 zS~ 65 TM o,no00000 130976.6 16.5t610 !7.07367 14,42470 4o86.715 28269,2~ 11,4862~ 2536.404 943.0867 324708,7 10.02479 43184.75 10137.11 2162.669 1.459709 10~07 On~ 5755.?g9 0,2050621 3287,530 n O00000n 13805~.1 15.~8680 16,6106t 1 4,9985!.) 5755.789 30644,96 1t ,11097 2846,148 972,0964 340405,~ g 8~6~90 47170.18 10034.12 2883.776 1.454817 10457,000 4!40.496 0,1621945 853,5303 O,O00OOOO 1~7985.6 !8,14943 18,49202 t4 7~60~ 4140.4o6 31483,97 12,20607 ~526,260 180,6410 384295.6 9.831902 46772.63 10094.50 772,4150 1,595379 10407.000 5~54.~67,, . 0 15000~ 139292.9 5854.367 2014.$04 1~5.5619 46067.10 o~57.703 I 0357· 00"'..: 0.219.o349 742.9131 O.O00000O 136=nl t 16.69321 I S. t 8877 I 4· 79"40 28534.4! 11 .92255 p' / 140. cq~42 340203.0 10 7~87 43443.50 10137.65 591.2041 1 533q2TM m ~ ~ 10307.000 3520.002 0.2884013 1q4° S~.49998 139536.1 19. 504L!,2 13.34067 14.22550 3520.002 27789.4~ !2.30678 2342.668 266.6213 341936.6 10.44224 43079.62 10109.43 770.8308 1.531712 10257,000 37t0 0.22~112~ 977.5518 0.0000000 131554.8 !8.90043 19.4~759 14.99850 37!0.886 26985 1 2. 27402 2157.988 270.2722 331217.0 10.6334~ 41950.55 10086.83 765.7302 1.494819 i0207.000 1061 .840 0.6006469 714.6900 0.0000000 143094.9 30.98198 ~4.14284 14.9~850 1061.840 23314.45 13.¢0309 1472.600 146.8495 323009.8 10.68138 35532.73 10097.6~ 495.3340 1.536052 10157.000 O.OOOO000 14.99559 89.o91'31 609o.395 1 09.9890 32146.78 100.9890 161 .5076 10058.99 1 31~?0 42 30~6'~ 442~ 559 qgx~l 06 599 ~40Z 629.9370 67.77782 20.1~05~ 12.91907 1.726638 TOTAL DATA RECORDS : STARTING TAPE DEPTH = FILE TRAiLeR **** 94 10707,00 E ND I NG TAPE DEPTH 10147.00 FiLE PA S S **** FiL~ HEADE~ **~* 102L * ,~:ORMAT, RF-"'ORD_v (TYP~_,. 64). ONE D~PTH PER FRAMF- TAPE DEPTH UNIT : FT 19 CUqVES : N~ME 1 CCL 2 SPD 3 LS 4 SS 5 G2 5E15 CODE SAMPLE# UNIT 08 1 VOLT 58 i FT 6~ I CTS 68 t CTS 68 1 CTS ~8 1 CTS BYT=S 4 4 4 4 4 4 MON 68 "--~ 1 CTS 4 MSD 68 1 CTS 4 S G rq A 6 S I D I ~4 4 CSS 6g 1 CTS 4 ISS 68 1 CTS 4 ~KL 6~ I CTS 4 BKS 65 I CTS 4 RATO 68 1 DIM 4 RICS 68 1 DiM 4 RIN 68 I DiM 4 RBOR 68 I DIM ~ DATA DEPTH G2 M SD BKS RECORD (TYPE~ CC' ,_ GElS RATO O) 966 3YT;S CSS RZCS LS ISS SS M 0 N BKL RSOR 10708.000 176o.n2~ 0,275Q724 519,94~? O.OOOOOO0 147335,3 23.86548 2t . /" c730:; ¢, I 2.99 370 24207.58 t4.33044 1669.333 32.26328 346905.3 11 .36015 ~5796.42 10166.g9 139.9860 1.691733 10683,000 1604.873 0,4703344 258.0161 13658.000 4~45 49~ 0,253474! Z~2.1~40 0.0000000 145081.7 22. 38698 0.0000000 135051.3 16.6"3660 t8.52765 13,00460 1604.873 24567.41 14,20032 12.99870 46451492 27885.22 11.92992 1655.206 3~143761 343865.1 11.49064 2255.661 25 $~748 m '~ 332668.5 1 0.70207 37139.42 10252.75 ~1.62903 1.617392 4'1765.13 10101 77146700 1 .530304 10633.000 3905.832 0~7357632 255.4~30 0,0000000 138934.2 18,42293 !8,72797 12.99870 3905.832 27739.25 12.09223 2244.381 37.97735 335429.3 11.13903 42149.90 10239.34 6~.13400 1.531767 10603.000 1076.02! 0.61~1~92 274,3553 O."'OOnOnO0,,..., ,, !53255.1 30.49161 24.09761 t3.83980 1076,921 24280.05 14.71005 lZ~84.746 ~'~ 651 95 .;~ i 357161 .2 11.17576 35759.21 10213.10 108,2770 1 .640795 10583.000 4413.~6~ 0.2706445 237.6009 O.O000OO0 136864.4 18,2735~ lg.06~07 I 3. 25970 4413.563 c~7~01..0'~_., 11.0.5519 2239.379 28.62291 334917.9 11.03526 4'2430.09 10161,84 74'.23801 1.523~16 1355~.000 5562.770 0.1322689 2993.!90 O. O00nOOO= 139015.1 15.74462 !5.58494 13.96380 5562 77~ 29854,60 11 ,3~770 2893.980 106~.533 3319975.2 10.29(,75 44978.94 10211.35 2640.225 11505151 2~4.709~ 0.2023L0~ 657 J ~ : 10508,000 5589,68/4. 3,4.170450 3179,356 10483.000 4083.097 0.3216169 1073.~5~ 10458.000 4255 .e:16 0.3z~53873 I01'z.287 10433.0g0 4430.340 0.12891~ 711.3450 10408.000 5769.~'F3 0.!429873 723.2651 13383.000 540~.33~ 0.1806924 878,3679 4864.G63 0.3364100 851.0300 I0333..0D0 820.14o. 9 0.34~5637 779.17¢, .,', 10308.000 3817.850 O. 2557841 1380.121 10283.000 1819.678 0.3839~77 840.673! 40.3. £8.24.847 46~,2995 1354~7.~ 16.12381 15,65942 64.3499? 137782.4 I ~ 4~758 19.71753 0.0000000 154524.3 17.46385 17.27531 0.0000000 I 386.82.1 17.56624 ! S. 42090 6.449999 I '~6n~9 4 I 5 4856~ 16,,43567 O.OOgO000 140954.0 15.43t75 !5·75285 167.5500 155927.8 !6.83209 !7 22 la9863.2 32.53008 Z4,015Z6 0.0000000 !37238.1 18.4~I09 15.35921 0.0000000 1~!5o5.6 ~6.04315 22.03786 284.v090 -,~-~or.4 7~. ¢.. -... /' .., · .~ 15,9~156 13.~065© 5589.684 30212.22 11.08555 13.38630 4083,997 28654.45 11.71456 13.63480 4.255. ;~1 6 Z~76n~. 06 12.~25~3 I 3 4t . '.,) 4430.840 28~23.03 1t ·93740 13.531Z0 S769,273 29785.29 11.41646 13,73130 5406.336 2~677.33 11.7617~ 13.39090 4~64,063 28752.71 11.8026¢ 13.62.490 $20.14~9 ~3762.5.5 15.04147 13.48200 3817.850 27703.04 12.20527 13.84220 1819.678 25135.7! 13.71~31 57.92354 3- I '~ . ~42o~ 940.3867 334919.0 9.922308 2273.547 133.3179 335674.4 10.88726 2558,960 126,0409 3&9788.9 10,49089 2338.587 126.4824 341684.0 10.94241 2743.066 120.5300 340042.5 10.71243 2831.280 12'~.23£8 349053.1 10.65~82 7552.o73 152.0901 339357.e 10.8t582 1493.205 13fi.9759 '357424.1 1C.88758 235Z.642 250.4336 33~123.3 10.39633 1775.644 157.6860 34466,3.7 11.03329 101 ,~0.66 277.1340 1 .625625 46363.98 10197.54 2795.550 1 · 4591 44874.41 10209.33 769.9192 1.496631 447~9.16 9947.172 790.1157 1.56~073 43034.71 13156.69 539.1599 1.5Z0116 45171 .70 10190.38 553.0090 1.51 731 5 4469!.75 13155.54 g17.35~1 !.530434 43950.48 10215.16 611.1340 1.520295 35826.38 go03.344 513.9893 1,619149 43047.00 10Z09.61 7o5.9712 1.522313 38935.54 10153.80 610.5652 1 .558574 1065.4'52 ,~,233. OOu 4267.!$~- 0.2237732 I 506 7 IOZOS.00G 613.4819 0.75~0~78 774.6013 1 01 83. 43.!06~9 0.37945~9 756.6~0 I 0 '15 ~. 0 0.0000000 13! ~-:O~ q49Z 1336"'--", 9 t9.4, 31 19.580~0 1'~ ~ ~,IH 1 !7.210z, 5 17.75209 O.OOOOO00 137951 .1 35.01137 25.92455 O. 1 20400.1 45.15456 34.23990 .0000300 623~.379 779. 3904 17. 40001 265~9.$7 12.455~9 1 3.9o860 4267. I '_8 c"} 270 46 . ~.", 12.~5988 ! 3. g9560 61 3.4Sl 9 21360.93 14.68010 13.62220 4~.!0599 16221 .76 19.3592.5 13.99860 0.0000000 6c9.9302 22.52856 3 '51 .4 15.527C, 1 2328.507 3~9.5754 334295.1 10.46524 1288.825 159.514Z, 320920.7 10.77154 549.5110 !45.3343 314041.0 12.11325 49.99501 156.4140 15768.42 8.960224 101.~3.05 749.4622 1 .548955 41243.35 10177.49 1212.002 1.520337 33301.30 10056.34 488.1904 1.575081 22267.02 10202.61 433.5139 1 .751553 ~69.9133 10163.99 31 9. 9070 1 .677420 TOTAL DaT& RECORDS : STARTING TAPE DEPTH = FILE TRAILER **** 157 10708.00 ENDING TAPE DEPTH 1014R.00 **** TAPE TRAILER LIS g6/31!12 366,~ 01 TOTAL R=CORnS iN T-~IS LOGTCAL TAP~ : 494 **** REEL LiS 88/31/12 ATLAS 01 TRAILER **** TOTAL RECORDS IN THIS LOGICAL TOTAL RECORDS !N THiS PHYSICAL REEL : REEL: 495 495 End of execution: Fri 13 jAN 89 9:53a SYSTEM RETURN COD~ = 0 A ** ~EF'QP!) TYPl;~ 1.3"/ ** 1 66 4 000 000 OJ 6 065 ooo ooo 004 o6s ooo ooo 004 oes ooo ooo 002 ocs ooo OhO Oou Ar,[ ~p! AP1 l,nG TYPF n n o 7 n 7 12 4,6 I n () ~o 52 t2 r) 2 ~ C, 3 ~ 1 () 4 4 0 0 42 l 0 6~ 2 0 n 0 0 34 g2 0 ~ ~, ~ 3 ~2 Ii ~2 6~ l,~VEb 4 4 n a 0 4 4, 0 ~ 0 I I RE:PR "'ODE 6~ 6~ 6~ 6R 6e 6~ 6~ 6~ 6La 6~ 6~ 6~ OEPT 'Joson.ooo(] AFT,ii GR ~,"}. 9~ 13 r'At, I 76P.0000 6~,2500 nT 1.~ 29~9 TbD 6~:0625 PT 2.~609 ~PgI -9gq.2500 It.,u '997,2500 GR ,6963 ORgO 31'3477 ~r -~9~.9500 7500 ,.,60~5 BRHr) .3~,3496 PEr 3f .9824 -q9g.2500 I bj~ 20,1250 I'[,~ 75.0000 G~ 21,53)2 PEr -no~.25no -q90.2500 -qgg.2500 -0,0156 5.5859 .77~.5 6 '~500 O. 352 07,9;3~5 5.0391 17.3125 6.~, 5 2,22~5 20.~406 n,O2n~ 9,45~2 ~P'T 26.3906 mT 8.57~! RHnB 1.a609 40.7500 34,5625 ~ ~7~1 ~ 6035 1,294 0000 nT 67 4375 TUn fi4 3750 BT 1.3 2969 ~HOB 2 9949 ~PHI. 083'5000 GR -o90 2500 IbD -ogq !5oo DT -~99 !500 ~HOB -990 2500 Np;{! 'ggg ~500 GR DT ¢R -090 :~500 ~,~PHi NR~T NCN:L 9600' nono 8F~,U -090,~5o0 6fi~.250o nT 2 !{. I 914 PEF' -qgq,25nO 45,9375 Ih" 75.0000 GR 15,1367 PEr -090.7500 31.~197 87.R175 GR 2.3066 nRHO 25.3418 PEr -099.2500 31.7969 lb. 77,4375 ~R ~ 4316 DRHO -099.2500 -099.7500 -999.2500 DRHO -qqO.~500 r,~lr -099.¢500 -o90.2500 DRHO 73.1250 -999, ~500 .:ogq. O99,2500 -990.2500 70.8! ~5 :, -~99 500 .( 9~, 0 O00 DRHO GR DRHO PEF D~HO DEr GR DRHO 3.0313 ]6,5000 26.3006 . 25.5155 ~4.5695 0.009] 2,6504 2000 o000 64:]7so 0. 0884 5,0664 '999 2500 '~99.~500 '999.~500 -agq.25nO -099.2500 -999,2500 -999,2500 -099.2500 -999:,~500 -990,2500 -999,2500 -099.~500 99 ~, ~ 5:00 09,, 2500 -999,2500 '999,9~500 :099 ~5:00: .999, ~500 -999.2500 -999,2500 -99932500 -099,~500 r)EPT 8~00 0000 Sp -o90 ?500 ~R~7 -o90 25o0 NCNL -ooq. 2500 DEPT ~7~0,~ ~' -09q,?SnO -0q0,2500 ~T -ogo.?500 -q90,7500 ~PHI -o~o,7500 er -mgg.2500 Tt,~ -090.2500 -og0,2500 -~9g.2500 TLD -o9o,2500 PT -ggg.~500 PHOB -~g0,2500 ~PHI -ogg 2500 -o9~ 2500 -99~ 2500 -~90.750o 'Ogg.~500 DT 2500 -og9.2500 -~gO,?500 DT 2500 ~HOB -ooo:7500 wPHI. -9:99.2500 · .gg9 2500 =099 2500 . .09~ ~5:00 -99g 2500 ., .2500 -999.2500 DT -g~o, 2500 74.g000 -990.2500 IL" -099,2500 CR -o90.2500 DRHO -o90.2500 PgE 95,2500 2500 -999,2500 -09~.7500 36.]750 -099.2500 -o90.2500 -o99.2500 DRHO -Ogg,.9..500 PEF 54.,750 -.999,7500 R 999,2500 DRHO -q99. ~500 DEF 56,531.3 -999,~500 -090.2500 -c~90. 2500 .ogee, 2500 48.7500 -999,2500 Ib~ -999'~500 DR){() -09g,~500 Pg~ 47.375:0 "q9~.2500 b~ -~9o'250() ~r · ,999.~500 DRHO -09g,~500 PEr 49:. ~125 2500 Ih~ 2500 cr 2500 DRHO -o9g,7500 -qgg 2500 -g99 2500 -qgg 9500 -o9g.2500 -090'2500 -099,2500 -999.2500 2500 -999:2500 -999.2500 -o9o.2500 -999,~500 -999,2500 -q90.~5o0 'ggg,2500 '999~2500 -~9g.~500 -q99.~500 'q99,2500 '~90.2500 '99g,2500 -ogg.~500 '999,2500 -099,250:0 -999' 2500 -999, ~500 .999; 2500 -g90,2500 -ggg ?500 ;p .~EP T ~P ,P SP nEPT SP SP ~R -oqo.2%n~'~ -09o.~5~0 CALl -o9o.75n0 C~ -o9~.2500 rAI~I -ogg.~SO0 ~C~L -o~g.250o r~I,l -o9o.~500 ~N~A ~?On.,OOOO 8FY,U o90.7500 ~R -o9°.2500 CALl RtOn,O000 ~FLU -099,~500 GR -oqo,2500 CALl' -qgO.25oO ~C.I, 8000, {~000 .oqO · -o90,2500 PNPA 7oon,o0oo sF!U -o90,7500 -o9o.~5n0 -09g 2500 TL~ -q90,~500 ~HOb -09q.7500 .P~l -090 ~500 ,~5o0 hT -qgqo~500 PHOB-o9o,7500 ~PNI-~9~.~500 TLD '0' ~500 -09~,?'500 NPHI 45.781] -99q.2500 IL~ -o99,2500 -o9g,2500 TL" -q90.7500 ~R -999.7500 ORgO 54.7500 099.~500 :999,2500 56,~50 -999.2500 IL~ -99q,~500 ~R -~99.2500 DRHO -99q.7500 ~Ev 66,1:875 '99g,2500 GR O R H 0 PEF YL~ ~HO'B - DRHO ~'PHI 0 a~ '099 ~50~ 2090. ,2500 ~T .,.0q9,~500 -~9q,2500 -09g,~500 9500 -g9i9,9500 Ii,~ -~9q,2500 per' -n99,2500 Ib~ -o90,7500 DRHO -090,~500 .9n,2500 99g,2500 q90.~500 999.2500 099.2500 '099,~500 -099, 500 -999,~500 -990.~500 -g99,2500 -OqO.2500 -099,~500 -~99.25n0 -999 -090'~.500 -~::99: ~500 -090,7500 -.99g,2500 ,999,2500 .-99~, ~500 099; 250o -,99g,~500 -999,~500 -0~0,~5oo -999,250:0 'q99'~50~ -09g'~500 -g9~,2500 -g99.2500 DEp~I 7900.0000 sp '849.25o0 NR~- -~99,25O0 ~NRA ~C~ -o9~.~5no OEP~ 7~00.0000 Sp -o9o,75n0 ~R ~R -~O.2500 CAI,il NR~.T -o9o,25n0 ~NRA ~CNL -~9o,250:0 gp NR~T ~CNL Tn00 0000 .o9o ?Sno 2500 7500 -~9~.25no C A L I SP 690... 0000 -O9o,2500 .060.?SOO rat,l -o9o 25n0 ~'PHI -o90,7500 aR -090.7500 -o9o.7500 -o90.2500 -090.2500 -0qo.2500 -09~.2500 =o9o 2500 BT -09q!2500 PHOB -099 25n0 ~P~l -a90.25o0 ~R -090.~500 Ihn -O90o 5nO nT -o90.~500 ~HOB -o90.2500 uP~I -a9a.~sno ~ -o9g ~500 -OVO 500 .o9o ~500 -ogO 500 -090 ~500 -099 -09q -99~ 5'500 ~ ~500 500 "099 ~500 -09o 25no -990 ~500 ~R PT RHOB I Lr) PT ~HOB 2500 lbo -990,2500 BT -.090.~500 P~tO:B ~999,~500 1LB -999.2500 ~0~ 23.2500 09q,7500 ~o90,2S00 -o99.2500 36,7813 -q99 2500 -099 ~500 3~,09~8 -990, 50 · -~90, ~.500 ~8,4~75 ,,999,~500 -~9~,2500 .~ ,5o 45.03!3 '999. 2500 '099,2500 '099,2500 -099.2500 19 '31:25 -99g, ~500 -999. 500 -090,7500 -o99,2.:) 0 35.6875 ) 27 ~656 -999. 2500 -09~.2500 099.2500 39.5000 · ,g9¢) 2500 -q9g' .7500 -990.2500 T 1.,, ~ DR H [J r~EF ~R IbM GR GR p~jp' ~R GR GR OR. NO pE~~ L~ DR~O '99q.2500 '999.25n0 -o99,2500 -g99.~500 -999.2500 -099 2500 · ,999~ 00 .09'u,2500 -o99.75n0 '999,2500 -g90.2500 '999,2500 -q99,2500 -090.2500 -099.~500 ,,,q99,2500 -q9o.2500 -9gq,2500 -o99,2500 -999,2:500 -~99,2500 ,,999, 500 ..g99.~500 -qgg,2500 -O9'q. ~500 -qOO.~SnO -090.250O -qog,75nO ~999,25:00 '999,9500 1 ')EP'r 6500 ';~ -090 qRgT -q9o VCI"L .,. 0 CALl ~500 . C 3F. PT gP ")EPT , SP 6C, 00 c~ r) 0 (' , , ) ,~FT. ti -o. 90o95n0 r'.lq -o00,95n0 c'al,l -09o, 2500 ~P[;I -090,9500 C~ -oqO,?500 Th~ -O~a,?SoO mT -Oqo.?500 PHOB -09q,2500 ~P~I -090.9500 O~ [ogo,~500 o9o,25o0 BT -090,2500 UHnB -~9~.75n0 -990 ~500 Ibm -o9o~7500 nT -g~g,~500 -o99 ?50g 250O ~PUl -99g.~500 ILO -OgO,~500 DT -999,2500 ~ROB ~HrIB 47,~437 -q99,~500 TbU -99~,7500 ~R 3~,71~8 -090.2500 Thu -000.~500 eR -999,7500 DR~O .090,7500 t)EW ~5,~969 -099.~500 IbP -999,7500 nR -009,~500 PEF 37,6563 '999 ~500 -09~' . ,~500 GR '990.2500 4~,~437 -099, ~500 DRN[.} -~99,2500 PEF 37,3750 -990 2500 TLu -g99'2500 r;~ .q9o,~sno -099,2500 '99g,~500 -099,9500 -099.~500 -999,~500 -099,2500 -999,2500 -~99,7500 -000,2500 -099,~500 -o99.9500 -999 -oqO '999,2500 -999; 250o .~g~g, ~500 g~.2500 -999. ]~6° 5 0 '09c~, 0 ,,099, ?5:00 ,'099,25:00 -099,2500 -999, ~500 -~90.~500 =999,2500 vC~I' r)EPT SP ~R NCNI, ~P SP ~¢N L SP ~EPT SP -o9o,2500 -o9o.~500 ~NPA %?On.O000 8Ft, U :q99,9~00 ~R 5600.0000 -090,7500 9500 ~5o0 rC~b 5500 0000 -ogo:?5nO -99U.~500 C~LI .ogq ~5~0 ~NPA -990' 54O0 0000 -Ogo ?500 -090 ?500 -ng9 3500 -o9g 9500 ~FLU ~NPA 5200.0000 SFLU -099 9bO0 -~90'2500 -090.7500 -000.2500 -a9~,2500 TLn -~0~,25no nT -a9o,2500 ~HnP -099,25n0 NP~I -o99.2500 TLD -09a,2500 nT -o90.2500 ~HOB -oqg,?500 mP.l -090,2500 TLD -a9o.25no DT -09n.7500 -999 ~500 -999 2500 .ago 9500 -990 ?5O0 ! GD NPNI -099.2500 ~Hn~ -gOO,?500 Vpu] -~9~22500 ~ nT mPHI ~R DT -099,2500 !bn -999.250o DT -990.~500 Ibm -aqa,~500 DT -990,2500 -ogq,?sno -009,7500 -o90,7500 36.59~8 -990,250n -oo9,25n(.) C,,R -°Og. 2500 -qgg, 2500 DEF 4,~,6563 i999 }500 -099:500 -999.2500 -a99,2500 PEF 40,00~ -999,2500 099,2500 :099. ?Soo -099, ~500 -099 -U9g 46 406] R DRFID '999,~500 lb~ -999,2500 (;a -999,2500 DRMO -o90,2500 PEF 19.9062 -999,2500 I:b~ -999,2500 ~RN~ -090,~500 mEF 25,5I$6 D~MO -999.2500 IL~ -990.2500 GR. -999.2500 DRHO 09o 2500 .99,2500 090,2500 '2'-o9o. 250o -999,2500 -999,~500 '999,~500 -099.2500 -099, 0 --099,9,500 -099,25n0 -099,2500 -099.2500 -999 2500 -090:2500 '999,2500 -099,2500 "99q, ~500 -'~9o.25oo -999,2500 '099,2500 :999,2500 999,2500 :999.2!500 .099,2500 -999,2500 -099.2500 -999 · '999, '2500 -099,250¢) -999 25!00 'ggg' ,2500 -090,2500 l~aT -ogo.?bn0 pp~iP a :~CM i.~ -o9o.~500 ?C~fL 990,2500 09a.2500 ;~ ogg. 250o ~,!~ ~g~,~500 ,09o ~500 DT '099' .09q,~500 RHO~ .~500 VPHI ~099~500 ~R .ED[ 4700,0000 SFT,U ~R 9~.~500 CALl: qRAT 990,~500 ~NRA uCN~. ~o9o,~500 rCNL DEPT 4600 qp -09o MRAT -ogo 0000 SF f., U 9,500 ')5no -ogg -~9~ 4~00.0000 SFLU -ogo,usn0 CR -090.2500 CALl -999,7500 ~N~A -~.75~0 WCNL DT SP 4aO0.O0OO SFLU -o9o,7500 -990,9500 CALl ?500 CALl -090,9500 ~NPA -ogo. ~500 ' CNL -099,2500 -o99 ?500 DT -090 ~500 RHOB -090 9500 -990,2500 ,~500 .~500 Npgi -999,~500 ?Ln .090'75n0 oT -ogq, 2500 hEP -o90.7500 -O90.2500 dR -099.2500 -099.7500 35.6250 -999,2500 Ih. -999,~500 GR -099,25n0 DRHO -999,~500 YEW 46.6250 -999,~500 -999,2500 -099,~500 ORHO -099.~500 PEF 46,62~0 -099,2500 '999.2500 '999,2500 new 46,093@ -999.2500 -099,7500 44,,~125 ~:500 ~500 0625 R GR -999.2500 -999,~500 dR -999.~500 -099,~500 o90 '2500 36.28!3 'qgq,?500 -990 2500 -099:2500 -999,2500 -099,~500 999!2500 999 2500 999 2500 -099.7500 -999,2500 -099,2500 5OO -999 2500 -999 ~500 -999 ~500 -99o ~500 ..99~,~500 99 , 2500 -099 ~500 -.9o: soo '999,~500 250o '999'~5~0 "999, '099,~5 .0 ,,,999 -g99 ,,,9991 -q99 5OO '99q.~500 -q90.25~0 -O99,9500 ~999,2500 099~7500 -999,2500 IRaT -aqo,?%nO :NPA DEPT ]~O0.OOnO SFt,t..t AP -q9~,2500 CR ~ -090.~500 CALl ~RAT -099 ~500 ~NPA DEPT 3~00.000() ~FI, U -999,~500 CALl NR.AT -Oq~,?500 PN~A NCNL .o9o.~5no ~CN'b .o0o, 7500 "'P~ l -999.~500 -aOO.~500 hT -o90,2500 -o90.2500 a)PNl -oqq.2500 a90:7500 BT -099.2500 ~HOB -990.2500 ILD -OOO 7500 DT -99~'~500 ~H~B ~ - -090.75n() NPH'! -~90 ?5OO -ogO 9500 -090 ~500 -O9q 2500 -090 2500 ?500 -090.2500 -e90,~500 -099 -099 -999 -o90 ~500 .,099 -090 ~500 ~HOB BT DT ~P~T DT ~PHI -999,9500 2999,~500 DT a0~,2500 -o9q, ?5no PEF ]7.0]75 -090,~500 PEF 44.0695 -o99,~500 -o90.~500 -o99.;500 3~.7969 -099,2500 Ib~ '090.~500 GR -999,2500 DRHO -099,?500 PEF 33.5938 -999 2500 -09~ ~500 b~ R DRHO -999,2500 Ib~ -090.2500 gR OReO 999,2:500 099.~5oo "999,2500 -909. ~50() -090 ~5no ~R -o99.25n0 -099.2500 -o90,75~0 -~9o.2500 -990,~500 -099.2500 099,~5o0 999.~500 o90,9500 -999.2500 -090,7500 '099.~500 -099, 500 -099,2500 -999.~500 -999.~5o0 "099,2500 -990,2500 -099,2500 -099,2500 -999,2500 "999,2500 :9:9'9,2500 990,~500 -99:9,2500 -a90.~500 .999 2500 -'999,~500 -999,~500 "999,2500 -990,25oo -09:0,2500 )EP!" 3100.nO00 SFt,U ;P -agq,?SnO cE ;R -aqq.~500 CAI,1 ~EOT 2aO0,O000 SFI,U ~p o90,75n0 ~g .~ :09o.~500 Phl, I qp .oqc~ w~r~T -ago 0000 ~Ft U ~500 qR r) E D T S P ~?00.0000 ~F~U -oga,~500 ~ .090.~500 CALl -69o,9500 P~PA 'vCNL 0000 SFI. U .0q9,~500 PNRA nE o T ~R aT -qgO ?500 -o9o,~5oo CALl -o90.7500 n ~: p 9' 2400,0000 ~LU -09~.9500 CAT,I -o,gn.~SnO -o9o.2500 TbD -ogq.~sno NP~I -090.7500 ~R -OOO,~500 -09o,2500 -~90.7500 -99~.2500 TLD 90,75 ~0 NPWl 99~.~500 ~R ~'50 'egg ~500 -o9 DT ~T RHOB CR ILO OR -999,~500 IbD ~500 .o9o,25n0 CR -090.2500 -09q,2500 -09q,~500 .agq,~500 20,42!9 -ogo.25nO :q99,7500 999,~500 DRHO -~90.~500 per 50o ~500 DRH'O QQQ,~500 DEw -999 2500 IL~ -999' ,2500 ~,R -999,~00 DRHO -~99, 500 P~lF 3:0,e75!0 '999,~500 IL~ -999,2500 GR -099,~500 D:RHO -~90,250o oE~ ]3.'18:75 -990,2500 ?500 -999 2500 -q90 ?500 -O9q ~500 -090 2500 -999 2500 -999 2500 -ogq ~500 -ogO ~500 -99q.~500 -qgg,~500 -999,~500 -99q,~500 -999,~500 -09q.~500 -99~,2500 -q9 -0qo,2500 -999,~500 -999,~50h .-999,2500 -o09,2500 999 ~500 ,9o:.2.,500 '999,2500 -999,9500 '999,~500 '999 2500 -099' .~5~0 -qgg, ~500 {' [ .7500 ~HOB -aqo.~SO0 ** ~ECO..,.D ~,YP !,37 -09O,7500 PEF .32.2500 -n9a,2500 IL~ -a~o.25nO -099,2500 PEr -q9o,2500 -n99,2500 -099,2:500 -999.2500 -o9g,2500 -999 2500 -a9a 2500 -~9'9 2500 .09~ 9500 21.0]1~ - q 9 0. ? 5 0 0 -~99.2500 -~99 ~500 .q90'2500 -999.2500 -999,2500 -090,2500 -099,2500 [~99,2500 -099,2500 -q~q,~500 -099. 500 -999 ~500 - 9o: soo