Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-058STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________MILNE PT UNIT F-45 JBR 11/14/2025 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:1 We tested with a 2-7/8" & 3-1/2" Test joints. F/P on 3-1/2" FOSV, worked valve and passed retest. N2 Precharge 12 @ 1000 psi Good test, they were fighting a broken test pump control handle. This made stopping at the correct pressure on then low test difficult, but were able to proceed testing while they searched for parts. Test Results TEST DATA Rig Rep:C.Pace / J. WerlingerOperator:Hilcorp Alaska, LLC Operator Rep:C. Demoski / R. Gallen Rig Owner/Rig No.:Hilcorp ASR 1 PTD#:1950580 DATE:9/30/2025 Type Operation:WRKOV Annular: 250/2000Type Test:INIT Valves: 250/2000 Rams: 250/2000 Test Pressures:Inspection No:bopJDH251001071615 Inspector Josh Hunt Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 7 MASP: 528 Sundry No: 325-443 Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.P Test Fluid W Misc NA Upper Kelly 1 P Lower Kelly 0 NA Ball Type 2 FP Inside BOP 1 P FSV Misc 0 NA 16 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 0 NA Annular Preventer 1 11"P #1 Rams 1 2-7/8" X 5" V P #2 Rams 1 Blinds P #3 Rams 0 NA #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 2-1/16"P HCR Valves 1 2-1/16"P Kill Line Valves 3 2-1/16"P Check Valve 0 NA BOP Misc 0 NA System Pressure P3050 Pressure After Closure P1900 200 PSI Attained P15 Full Pressure Attained P51 Blind Switch Covers:PAll Stations Bottle precharge P Nitgn Btls# &psi (avg)P4@2350 ACC Misc NA0 NA NATrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector 0 NAMS Misc Inside Reel Valves 0 NA Annular Preventer P17 #1 Rams P7 #2 Rams P5 #3 Rams NA0 #4 Rams NA0 #5 Rams NA0 #6 Rams NA0 HCR Choke P1 HCR Kill NA0       1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number): 10. Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 14,220'N/A Casing Collapse Conductor N/A Surface 3,090psi Production 5,410psi Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Wells Manager Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng ryan.lewis@hilcorp.com 303-906-5178 See Schematic See Schematic 3-1/2" N/A and N/A N/A and N/A Ryan Lewis 76' 20" 9-5/8" 7" 6,645' 14,159' N/A 5,750psi 7,240psi 4,381' 7,480' 6,678' 14,192' Length Size Proposed Pools: 113 113 10.37# / G-105 / NC31 TVD Burst 7,005' MD STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025509 / ADL0355018 195-058 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22556-00-00 Hilcorp Alaska LLC C.O. 816 AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): 8/16/2025 Perforation Depth MD (ft): Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY MILNE PT UNIT F-45 Milne Point Kuparuk River Oil N/A 7,502' 14,107' 7,414' 528 N/A eeeeeee d d No Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 4:31 pm, Aug 28, 2025 Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2025.08.28 14:40:36 - 08'00' Taylor Wellman (2143) 325-527 A.Dewhurst 29AUG25 DSR-8/28/25 10-404 MGR05SEP2025*&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.09.05 09:41:29 -08'00'09/05/25 RBDM JSB 090925 Well: MPF-45 PTD: 195-058 API: 50-029-22556-00-00 Well Name:MPF-45 API Number:50-029-22556-00 Current Status:RWO Rig:ASR #1 Estimated Start Date:9/22/2025 Estimated Duration:3days Regulatory Contact:Tom Fouts Permit to Drill Number:195-058 First Call Engineer:Ryan Lewis (303) 906-5178 (M) Second Call Engineer:Taylor Wellman (907) 777-8449 (O) (907) 947-9533 (M) Current Bottom Hole Pressure: 1,219 psi @ 6,915’ TVD 2/06/2021 | 3.5 EMW, 3.7 KWF Max Potential Surface Pressure: 528 psi Gas Column Gradient (0.1 psi/ft) Max Inclination 73° @ 10,315’ MD Max Dogleg: 8.8°/100ft @ 13,225’ MD Brief Well Summary: MPU producer F-45 well was drilled and completed as a Kuparuk producer in 1995. The last ESP completion was installed in 2019 and failed in 2025 due to an electrical ground. Previous ESP failures have been due to a mixture of pump failures due to sand/scale as well as previous ESP cable failures. The well has significant dog- legs from 13,100’ to 13,580’ that may be causing cable wear. ASR pulled the failed ESP, RIH to +-500’ MD and the motor on ASR died. The oil pan was full of metal shavings and we performed an engine swap. We continued in the hole set the packer and performed a passing 8-year 7” casing test. The packer was released and landed the work string leaving a kill string at 7005’ with an unset AS1X test packer on the end. We have a window on opportunity to perform a Gravel pack on MP H-11 due to time constraints around the Halliburton pumping crew so the decision was made that we were in a good stopping point on MP F-45 and to move over to H-11. We are scheduled to return to complete this RWO September 22nd 2025. Attachments: 1. Current Wellbore Schematic _____________________________________________________________________________________ Revised By TDF 1/2/2020 SCHEMATIC Milne Point Unit Well: MPU F-45 Last Completed: 12/6/2019 PTD: 195-058 TD =14,220’ (MD) / TD = 7,502’(TVD) 20” Orig. KB Elev.: 48.35’/ GL Elev.: 13.4’ (N27E) RT to Tbg. Spool = 32.46’ (N 27E) 7” 1 9-5/8” PBTD =14,107’ (MD) / PBTD = 7,414’(TVD) KUP A Sands CASING DETAIL Size Type Wt/ Grade/ Conn Drift ID Top Btm BPF 20" Conductor 91.1 / NT80LHE / N/A N/A Surface 113' .0355 9-5/8" Surface 40 / L-80 / BTC 8.679 Surface 6,678’ 0.0759 7" Production 26 / L-80 / NSCC 6.151 Surface 14,192’ 0.0383 TUBING DETAIL 3-1/2" Tubing 10.37 / G-105 / NC-31 Surface 7,005’ JEWELRY DETAIL No Depth Item 1 7005’AS1X test packer PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kuparuk A1 13,781’ 13,865’ 7,148’ 7,216’ 84 8/19/1995 Open Ref Log: 08/19/95 GR/CCL – 22gm. Jumbo Jet (BH) Charges @ 60° Phasing Random Orientation – EHD=0.76” / TTP=6.4” Mid-perf = 7186’ TVD / 12,823’ MD OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) 30” Hole 9-5/8" 1300 sx PF ‘E’, 250 sx Class ‘G’, 250 sx PF ‘E’ 12-1/4” Hole 7” 225 sx Class ‘G’ 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 1,100’ Max Hole Angle = 73° from 4500’ – 11,700’ Hole Angle through perf interval = 36° TREE & WELLHEAD Tree Cameron 2-9/16” 5M Wellhead 11” 5M FMC Gen 5, w/ 7” x 11” Tbg. Hngr., 2-7/8” EUE 8rd Threads T&B, 2-1/2” CIW “H” BPV profile GENERAL WELL INFO API: 50-029-22556-00-00 Drilled and Cased by Nabors 27E - 07/28/95 ESP Completion Installed by Nabors 4ES 1/19/1996 RWO ESP by Nabors 4ES 10/12/2000 RWO ESP by Nabors 4ES 04/12/2004 RWO ESP by Nabors 4ES 06/19/2006 RWO ESP by Nordic #3 1/16/2016 RWO ESP by Innovation 12/6/2019 STIMULATION SUMMARY 9/23/95 – 147 M lbs. 16/20 Carbolite @ 40bpm – no screen out. Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 08/13/2025 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20250813 Well API #PTD #Log Date Log Company Log Type AOGCC E-Set# KBU 24-06RD 50133204990100 206013 4/2/2025 YELLOWJACKET GPT-PERF MPB-24 50029226420000 196009 7/9/2025 READ CaliperSurvey MPB-34 50029235690000 216139 7/7/2025 READ CaliperSurvey MPF-45 50029225560000 195058 7/30/2025 READ CaliperSurvey ODSK-41 50703205850000 208147 8/9/2025 READ CaliperSurvey ODSN-25 50703206560000 212030 6/22/2025 READ CaliperSurvey ODSN-31 50703205650000 208003 8/11/2025 READ CaliperSurvey PBU 06-11A 50029204280100 225042 7/13/2025 BAKER MRPM PBU 13-19 50029206900000 181180 6/4/2025 HALLIBURTON WFL-TMD3D PBU 14-18C 50029205510300 225040 6/24/2025 BAKER MRPM PBU 14-43A 50029222960100 225041 7/30/2025 BAKER MRPM PBU C-01B 50029201210200 212053 7/19/2025 BAKER MRPM SD-07 50133205940000 211050 7/27/2025 YELLOWJACKET SCBL SP 12-S3 50629235130000 214067 7/18/2025 YELLOWJACKET PERF Please include current contact information if different from above. T40771 T40772 T40773 T40774 T40775 T40776 T40777 T40778 T40779 T40780 T40781 T40782 T40783 T40784 MPF-45 50029225560000 195058 7/30/2025 READ CaliperSurvey Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.08.15 10:11:56 -08'00' 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9.Property Designation (Lease Number):10.Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 14,220'N/A Casing Collapse Conductor N/A Surface 3,090psi Production 5,410psi Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14.Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16.Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Wells Manager Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng ryan.lewis@hilcorp.com 303-906-5178 See Schematic See Schematic 2-7/8" N/A and N/A N/A and N/A Ryan Lewis 76' 20" 9-5/8" 7" 6,645' 14,159' N/A 5,750psi 7,240psi 4,381' 7,480' 6,678' 14,192' Length Size Proposed Pools: 113 113 6.5# / L-80 / EUE 8rd TVD Burst 13,493' MD STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025509 / ADL0355018 195-058 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22556-00-00 Hilcorp Alaska LLC C.O. 816 AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): 8/16/2025 Perforation Depth MD (ft): Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY MILNE PT UNIT F-45 Milne Point Kuparuk River Oil N/A 7,502' 14,107' 7,414' 528 N/A No Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 4:08 pm, Jul 25, 2025 Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2025.07.25 15:46:21 - 08'00' Taylor Wellman (2143) 325-443 10-404 * BOPE test to 2000 psi. 24 hour notice. * 30 minute charted pressure test of IC for records and 10-404. DSR-8/14/25SFD 8/11/2025MGR30JUL25*&: 8/14/2025 Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.08.14 13:14:03 -08'00' RBDMS JSB 081825 Well: MPF-45 PTD: 195-058 API: 50-029-22556-00-00 Well Name:MPF-45 API Number:50-029-22556-00 Current Status:Shut-in ESP Rig:ASR #1 Estimated Start Date:8/16/2025 Estimated Duration:9 days Regulatory Contact:Tom Fouts Permit to Drill Number:195-058 First Call Engineer:Ryan Lewis (303) 906-5178 (M) Second Call Engineer:Taylor Wellman (907) 777-8449 (O) (907) 947-9533 (M) Current Bottom Hole Pressure: 1,219 psi @ 6,915’ TVD 2/06/2021 | 3.5 EMW, 3.7 KWF Max Potential Surface Pressure: 528 psi Gas Column Gradient (0.1 psi/ft) Max Inclination 73° @ 10,315’ MD Max Dogleg: 8.8°/100ft @ 13,225’ MD Brief Well Summary: MPU producer F-45 well was drilled and completed as a Kuparuk producer in 1995. The last ESP completion was installed in 2019 and failed in 2025 due to an electrical ground. Previous ESP failures have been due to a mixture of pump failures due to sand/scale as well as previous ESP cable failures. The well has significant dog- legs from 13,100’ to 13,580’ that may be causing cable wear. The longest pump run-time was 9 years from 2006 to 2015. During that period, a considerable effort was made to maintain a proper scale inhibition program. During no other interval was a scale program maintained, and the average pump life was approximately 3-years. We are evaluating the need for a SI program. Objectives: Pull failed ESP completion, run a test packer for the 8 year casing test, run new ESP completion. Notes Regarding Wellbore Condition: - 7” casing test to 2,000 psi on 1/14/2016. Pre-Rig Procedure (Non Sundried Work) Slickline 1. RU slickline, pressure test PCE to 250psi low / 2,500psi high. 2. Drift and tag with sample bailer. 3. Caliper from 13,419’ to surface. 4. Attempt to pull dummy valve from GLM at 13,277’ MD and leave open. 5. Pull GLV and set dummy valve in upper GLM at 195’ MD. 6. RDMO. Coiled Tubing (Contingency) 1. Pressure test PCE per CT weekly test protocol. 2. PU 1.75” jet nozzle. 3. Jet down to discharge head at 13,419’ MD. 4. Following best practices in PE manual, pump gel sweeps to clean up tubing. 5. Chase gel out of hole. 6. PU a Read 1.69” 24-arm Caliper and log from 13,419’ MD to surface. a. Read’s main dispatch 907-250-8233 7. PU 1.56” tubing punch with 5’ of titan Circ charges at 13,400’ MD Well: MPF-45 PTD: 195-058 API: 50-029-22556-00-00 8. RIH and tag discharge head. 9. Pump down ball to fire tubing punch. 10. Confirm circulation by pumping down backside of coil. 11. Freeze protect tubing as POOH. 12. RDMO. Pumping & Well Support 1. Clear and level pad area in front of well. Spot rig mats and containment. 2. RD well house and flowlines. Clear and level area around well. 3. RU Little Red Services. RU reverse out skid and 500 barrel returns tank. 4. Pressure test lines to 3,000 psi. 5. Circulate at least one wellbore volume with produced water down tubing, taking returns up casing to 500 barrel returns tank. Bullhead down tbg and IA taking returns to formation as needed to establish and maintain a full column of produced water. 6. Confirm well is dead. Contact operations engineer if freeze protection is needed prior to ASR arrival. 7. RD Little Red Services and reverse out skid. 8. Set BPV. ND tree. NU BOPE. Brief RWO Procedure (Begin Sundried Work) 1. MIRU Hilcorp ASR #1 WO Rig, ancillary equipment, and lines to 500 barrel returns tank. 2. Check for pressure and if 0 psi set CTS plug. If needed, bleed off any residual pressure off tubing and casing. a. If needed, kill well with produced water prior to setting CTS. 3. Test BOPE to 250 psi low/ 2,000 psi high. Test annular to 250 psi low/ 2,000 psi high (hold each ram/valve and test for 5-min). Record accumulator pre-charge pressures and chart tests. a. Perform test per ASR 1 BOP Test Procedure b. Notify AOGCC 24 hours in advance of BOP test. c. Confirm test pressures per the Sundry conditions of approval. d. Test VBR rams on 2-7/8” and 3-1/2” test joint. e. Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 4. Bleed any pressure on casing to the returns tank. Pull CTS plug. Bleed any pressure off tubing to the returns tank. Kill well with produced water as needed. Pull BPV. a. If indications show pressure underneath BPV, lubricate out BPV. 5. Call out Centrilift for ESP pull. 6. MU landing joint or spear, BOLDS, PU on the tubing hanger. a. Tubing hanger is an FMC 11” x 2-7/8” EUE thread T&B. b. 2019 tubing PU weight on Innovation recorded as 130 kip (Block weight 35K). Slack off weight recorded as 68 kip. c. 2-7/8” L-80 EUE yield is 144 kip. 7. Confirm hanger free, lay down tubing hanger. 8. POOH and lay down the 2-7/8” tubing. Well: MPF-45 PTD: 195-058 API: 50-029-22556-00-00 a. Re-run tubing pending Caliper. Contact OE for results. b. Keep ported discharge head and centralizer for future use. c. Note any sand or scale inside or on the outside of the ESP on the morning report. d. Recorded Clamp Totals: i. Canon Clamps: 268 ii. Motor Clamp: 1 iii. Flat guard Clamps: 2 iv. Pump Clamps: 7 9. Lay Down ESP. If the ESP comes out clean, then go straight to the test packer run. 10. PU 3-1/2” workstring, test packer, 7” casing scraper and muleshoe. RIH to 7,000’ MD. +-300’ below the 9-5/8” casing shoe. Drop out the casing scraper if the ESP pulls clean. 11. Circulate well clean. 12. Scrape casing interval from 7,100’ to 6,900’ MD. 13. Set 7” test packer at 7,000’ MD. 14. Test 7” casing to 2,000 psi for 30 minutes. 15. POOH while filling hole with 2x displacement. 16. RIH with new/re-use 2-7/8” 6.5# L-80 ESP completion to +/- 13,300’ and obtain string weights. a. Check electrical continuity every 1000’. b. Note PU and SO weights on tally. c. Install ESP clamps per Baker, and cross coupling clamps every other joint Nom. Size Length Item Lb/ft Material Notes 5.85 2 Centralizer 4 4.5 2 Intake Sensor 30 5.62 17 Motor - 250HP 80 5.2 7 Lower Tandem Seal 38 5.2 7 Upper Tandem Seal 38 5.2 8 Gas Separator 52 5.38 10 Pumps – GGINPSHH 20 stg 45 5.38 28 Pumps – Flex-17.5 135 stg 45 1 Ported Discharge Head 13 L-80 2-7/8" 10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 30 2-7/8" EUE 8rd L-80 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8"2 XN-nipple 2.313" / 2.205" No-Go 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 60 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8"8 2-7/8" x 1" GLM, DV installed 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 12,925 2-7/8" EUE 8rd Jt 6.5 L-80 Well: MPF-45 PTD: 195-058 API: 50-029-22556-00-00 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8"8 2-7/8" x 1" GLM, 1/4" OV 6.5 L-80 ~200 MD 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 150 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8" 10 Space out pup 6.5 L-80 2-7/8" 30 Tubing Hanger with full joint 6.5 L-80 17. Land tubing hanger. Use extra caution to not damage cable. 18. Lay down landing joint. 19. Set BPV. 20. RDMO ASR. Post-Rig Procedure: Well Support 1. RD mud boat. RD BOPE house. Move to next well location. 2. RU crane. ND BOPE, set CTS plug, and NU tree. 3. Test tubing hanger void to 500 psi low/5,000 psi high. Pull CTS and BPV. 4. RD crane. Move 500 bbl returns tank and rig mats to next well location. 5. RU well house and flowlines. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 3. Double BOPE Schematic _____________________________________________________________________________________ Revised By TDF 1/2/2020 SCHEMATIC Milne Point Unit Well: MPU F-45 Last Completed: 12/6/2019 PTD: 195-058 TD =14,220’ (MD) / TD = 7,502’(TVD) 20” Orig. KB Elev.: 48.35’/ GL Elev.: 13.4’ (N27E) RT to Tbg. Spool = 32.46’ (N 27E) 7” 2 3 7 & 8 9 9 10 & 11 9-5/8” 1 PBTD =14,107’ (MD) / PBTD = 7,414’(TVD) 5 4 KUP A Sands 6 CASING DETAIL Size Type Wt/ Grade/ Conn Drift ID Top Btm BPF 20" Conductor 91.1 / NT80LHE / N/A N/A Surface 113' .0355 9-5/8" Surface 40 / L-80 / BTC 8.679 Surface 6,678’ 0.0759 7" Production 26 / L-80 / NSCC 6.151 Surface 14,192’ 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5 / L-80 / EUE 8rd 2.347 Surface 13,493’ 0.0058 JEWELRY DETAIL No Depth Item 1195’GLM STA# 2: 0.25” OV 2 13,277’GLM STA# 1: Dummy 3 13,367’ 2-7/8” XN-Nipple (2.205 No-go ID) 4 13,419’ Bolt On Discharge Head: GPDIS 5 13,420’ Ported Discharge Head: 6 13,421’ Pump 3: 538SXD / 41P23 7 13,427’ Pump 2: 538SXD / 119P23 8 13,445’ Pump 1: 538PMSXD / 20GINPSHH 9 13,455’ Gas Separator: GRSFTX 10 13,458’ Upper Tandem Seal: UTGSB3DB 11 13,465’ Lower Tandem Seal: LTGSB3DB 12 13,472’ Motor: XP 250Hp / 2,505V / 61A 13 13,488’ Zenith Motor Gauge & Centralizer:Bottom @ 13,493’ PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kuparuk A1 13,781’ 13,865’ 7,148’ 7,216’ 84 8/19/1995 Open Ref Log: 08/19/95 GR/CCL –22gm. Jumbo Jet (BH) Charges @ 60° Phasing Random Orientation –EHD=0.76” / TTP=6.4” Mid-perf = 7186’ TVD / 12,823’ MD OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) 30” Hole 9-5/8" 1300 sx PF ‘E’, 250 sx Class ‘G’, 250 sx PF ‘E’ 12-1/4” Hole 7” 225 sx Class ‘G’ 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 1,100’ Max Hole Angle = 73° from 4500’ – 11,700’ Hole Angle through perf interval = 36° TREE & WELLHEAD Tree Cameron 2-9/16” 5M Wellhead 11” 5M FMC Gen 5, w/ 7” x 11” Tbg. Hngr., 2-7/8” EUE 8rd Threads T&B, 2-1/2” CIW “H” BPV profile GENERAL WELL INFO API: 50-029-22556-00-00 Drilled and Cased by Nabors 27E - 07/28/95 ESP Completion Installed by Nabors 4ES 1/19/1996 RWO ESP by Nabors 4ES 10/12/2000 RWO ESP by Nabors 4ES 04/12/2004 RWO ESP by Nabors 4ES 06/19/2006 RWO ESP by Nordic #3 1/16/2016 RWO ESP by Innovation 12/6/2019 STIMULATION SUMMARY 9/23/95 – 147 M lbs. 16/20 Carbolite @ 40bpm – no screen out. _____________________________________________________________________________________ Revised By TDF 7/17/2025 PROPOSED Milne Point Unit Well: MPU F-45 Last Completed: 12/6/2019 PTD: 195-058 TD =14,220’ (MD) / TD = 7,502’(TVD) 20” Orig. KB Elev.: 48.35’/ GL Elev.: 13.4’ (N27E) RT to Tbg. Spool = 32.46’ (N 27E) 7” 2 3 7 & 8 9 9 10 & 11 9-5/8” 1 PBTD =14,107’ (MD) / PBTD = 7,414’(TVD) 5 4 KUP A Sands 6 CASING DETAIL Size Type Wt/ Grade/ Conn Drift ID Top Btm BPF 20" Conductor 91.1 / NT80LHE / N/A N/A Surface 113' .0355 9-5/8" Surface 40 / L-80 / BTC 8.679 Surface 6,678’ 0.0759 7" Production 26 / L-80 / NSCC 6.151 Surface 14,192’ 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5 / L-80 / EUE 8rd 2.347 Surface ±XX,XXX’ 0.0058 JEWELRY DETAIL No Depth Item 1 ±XXX’GLM STA# 2: 2 ±XX,XXX’GLM STA# 1: 3 ±XX,XXX’ 2-7/8” XN-Nipple (2.205 No-go ID) 4 ±XX,XXX’ Bolt On Discharge Head: 5 ±XX,XXX’ Ported Discharge Head: 6 ±XX,XXX’ Pump 3: 7 ±XX,XXX’ Pump 2: 8 ±XX,XXX’ Pump 1: 9 ±XX,XXX’ Gas Separator: 10 ±XX,XXX’ Upper Tandem Seal: 11 ±XX,XXX’ Lower Tandem Seal: 12 ±XX,XXX’ Motor: 13 ±XX,XXX’ Motor Gauge & Centralizer: Bottom @ ±XX,XXX’ PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kuparuk A1 13,781’ 13,865’ 7,148’ 7,216’ 84 8/19/1995 Open Ref Log: 08/19/95 GR/CCL – 22gm. Jumbo Jet (BH) Charges @ 60° Phasing Random Orientation – EHD=0.76” / TTP=6.4” Mid-perf = 7186’ TVD / 12,823’ MD OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) 30” Hole 9-5/8" 1300 sx PF ‘E’, 250 sx Class ‘G’, 250 sx PF ‘E’ 12-1/4” Hole 7” 225 sx Class ‘G’ 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 1,100’ Max Hole Angle = 73° from 4500’ – 11,700’ Hole Angle through perf interval = 36° TREE & WELLHEAD Tree Cameron 2-9/16” 5M Wellhead 11” 5M FMC Gen 5, w/ 7” x 11” Tbg. Hngr., 2-7/8” EUE 8rd Threads T&B, 2-1/2” CIW “H” BPV profile GENERAL WELL INFO API: 50-029-22556-00-00 Drilled and Cased by Nabors 27E - 07/28/95 ESP Completion Installed by Nabors 4ES 1/19/1996 RWO ESP by Nabors 4ES 10/12/2000 RWO ESP by Nabors 4ES 04/12/2004 RWO ESP by Nabors 4ES 06/19/2006 RWO ESP by Nordic #3 1/16/2016 RWO ESP by Innovation 12/6/2019 STIMULATION SUMMARY 9/23/95 – 147 M lbs. 16/20 Carbolite @ 40bpm – no screen out. Milne Point ASR Rig 1 BOPE 2025 11” BOPE 4.48' 4.54' 2.00' CIW-U 4.30' Hydril GK 11" - 5000 Blin d11'’- 5000 DSA, 11 5M X 7 1/16 5M (If Needed) 2 1/16 5M Kill Line Valves 2 1/16 5M Choke Line Valves HCRManualManualHCR Stripping Head 2-7/8” x 5” VBR Samuel Gebert Hilcorp Alaska, LLC GeoTech Assistant 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: sam.gebert@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: DATE: 9/15/2020 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU F-45 (195-058) Multi Finger Caliper Log ANALYSIS FIELD DATA Please include current contact information if different from above. PTD: 1950580 E-Set:33892 Received by the AOGCC 09/16/2020 Abby Bell 09/16/2020 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS RECEIVED JAN 03 2020 OGCC 1. Operations Abandon Ll Plug Perforations I I Fracture StimulateLi Pull Tubing ✓ Operations shutdown Li Performed: Suspend ❑ Perforate L Other Stimulate❑ Alter Casing✓ ❑ Change Approved Program ❑ Plugfor Redrill ❑ arforate New Pool ❑ Repair Well❑ Re-enter Susp Well ❑ Other: ESP Change -out Q 2. Operator Hilcorp Alaska LLC 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development ❑✓ Stratigraphic❑ Exploratory ❑ Service ❑ 195-058 3. Address: 3800 Centerpoint Dr, Suite 1400 Anchorage, 6. API Number: AK 99503 50-029-22556-00-00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0025509 /ADL0355018 MILNE POINT UNIT F-45 9. Lags (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): N/A Milne Point/ Kuparuk River Oil % 11. Present Well Condition Summary: Total Depth measured 14,220 feet Plugs measured N/A feet true vertical 7,502 feet Junk measured N/A feet Effective Depth measured 14,107 feet Packer measured N/A feet true vertical 7,414 feet true vertical N/a feet Casing Length Size MD TVD Burst Collapse Conductor 76' 20" 113' 113' N/A N/A Surface 6,645' 9-5/8" 6,678' 4,381' 5,750psi 3,090psi Production 14,159' 7" 14,192' 7,480' 7,240psi 5,410psi Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing (size, grade, measured and true vertical depth) 2-7/8" 6.5# / L-80 / EUE 8rd 13,493' 6,915' Packers and SSSV (type, measured and true vertical depth) N/A N/A N/A N/A 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 540 0 Subsequent to operation: 110 81 999 420 347 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 15. Well Class after work: Daily Report of Well Operations Exploratory❑ Development0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil ✓ Gas WDSPL Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319-471 & 319-517 Authorized Name: Chad HelgesonDavid Haakinson Contact Name: / Authorized Title: Operations Manager Contact Email: dhaakinson af�.hilcoro.com Authorized Signature: Date: 1/3/2019 Contact Phone: 777-8343 Form 10-404 Revised 4/2017 MCIMS0 66"J JAN u 6 2020 Submit Original Only H Ilileorp Alaska, ILC January 3, 2020 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: 907/777-8300 Fax: 907/777-8301 Re: Summary of Operations for MPU F-45 (Sundry #319-471 and #319-517) Hilcorp Alaska, LLC (HAK) did not complete perforations of the lower Kuparuk Al sand. During the rig workover, a -line tagged high and was unable to drift to the targeted perforation depths. The perforation job was therefore cancelled and a new ESP completion was run as planned If you have any additional questions concerning this request, please contact me at 777- 8343 or by email at dhaakinson@hilcorp.com. Regards, David Haakinson Operations Engineer Hilcorp Alaska, LLC Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MP F-45 Innovation 50-029-22556-00-00 195-058 12/2/2019 1 12/6/2019 11/27/2019- Wednesday No operations to report. 11/28/2019 -Thursday No operations to report. 11/29/2019 - Friday No operations to report. 11/30/2019 -Saturday No operations to report. 12/1/2019 -Sunday No operations to report. 12/2/2019- Monday Test BOPE's 250/2,500psi on 2-7/8" test joint, no failures. AOGCC right to witness waived by Brian Bixby. Test gas alarms. Perform accumulator drawdown: starting pressure 2,950psi, final 1,400psi, 1st 200psi recovery 30 seconds, full recovery 100 seconds (6) N2 bottles with 2325psi average. R/D testing equipment. L/D testjoint. Blow down choke and kill lines. Pick up 'T' bar and pull CTS plug in BPV. Pressure observed below BPV. Close blind rams, line up and bullhead tubing volume at 1.5 bpm, 30psi. Pull BPV. Pick up 4" HT38, M/U XO's for landing joint. M/U to tubing hanger, BOLDS. Pull hanger to floor PUW 118,K. Pump 100 bbls down annulus with no returns. Rig up Centrilift, hang sheave and elephant trunk. R/U Weatherford power tongs. L/D hanger and landing joint. POOH with 2-7/8" tubing with ESP from 13.590' to 9,695', racking back in derrick and strapping. L/D 1 GLM. Adding 25 bph down back side with no returns. Cont. to POOH with 2-7/8" tubing with ESP from 9,695' to 6,271', racking back in derrick and strapping. L/D joints 143, 160-164, 186, 187 as per procedure, L/D joints 165, 166 due to bent connection. Adding 25 bph down back side with no returns. Change out full ESP spool with empty spool. Cont. to POOH with 2-7/8" tubing with ESP from 6,271' to 5,705', racking back in derrick and strapping. L/D joints 245, 250 per procedure. Adding 25 bph down back side with no returns. 12/3/2019 -Tuesday Cont. to POOH with 2-7/8" tubing with ESP from 5,705' to 200', racking back in derrick and strapping. L/D joints 252, 290, 293, 299, 303, 305, 314-318, 322, 325, 332, 344 per procedure. L/d Joint 413, 419 due to egged pin and 1t 420 due to bad box. L/d ESP assembly as per centrilift. Adding 10 bph down back side with no returns. Recovered: 220 cross collar cannon clamps, 5 Protectorlizers, 3 flat guards, 2 SS bands. Shut down hole fill. Shut blinds. Rig up hole fill line on IA and continue to fill the hole with 10 bph fluid. Deflate airboot and pull riser. P/U shooting flange in cellar and M/U on top of annular. SimOps: R/D elephant trunk from ESP sheave. Pick up and M/U wire line valves. Build drift tool string, Gamma, CCL and blank perf guns and stab lubricator. Rig up to test lubricator, flood lines and lubricator. Attempt to PT lubricator against blinds 250/1,000 psi. Observe slight leak on shooting flange flange, tighten, Continue to attempt and PT lubricator, unable to get to hold pressure but no leaks observed. Conduct rolling test 250 psi for 5 minutes, no leaks on lubricator or shooting flange. Bring pressure up to 1,000psi and continue pumping, no leaks, observe pressure start falling off quickly after 15-20 seconds without any leaks. Allow pressure to bleed off. Discuss options with town. RIH with drift tool string on E -line. Set down at 8,727', work down to 9,900'. Continue to work string down picking up to 7,280', work down to 10,082'. Unable to work past. POOH to add a roller on top of string. Continue to add 10 bph fluid through M. f J� r Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig I API Number Well Permit Number Start Date End Date MP F-45 Innovation 1 50-029-22556-00-00 195-058 12/2/2019 12/6/2019 12/4/2019 - Wednesday Continue steam and thaw lubricator to free E -line. M/U additional 3.6" (OD) roller on top of blank guns w/ CCL, Gamma. M/U lubricator. RIH w/ gauge run assy on Pollard E -Line to tag depth of 13,834' MD. Attempt to work past with no success. Solid tag w/ no overpull seen picking up. Stage up pumps to 5 bpm w/ pump psi and attempt to work past. Deepest tag depth @ 13,838' WLM. Attempt to pick up, observed "'500-600 lbs overpull w/ no movement. Shut dawn pumps (well on vac). Hold line in tension @ 2,900-3,100 lbs and pulled free after relaxing differential sticking across original perfs. P/U to 13,700' and park for 1 hr allowing time for well to balance. Make several attempts to work past 13,838' WLM with no success. POOH and L/D gauge assy. R/D and L/D lubricator, overhead equipment and replace shooting flange on annular with flow riser. Hang blocks. Cut and slip 113' of drilling Iine.Checked brake gaps. Torque deadman clamp. Check sheave wobble at crown and travelling blocks. Service rig: grease crown sheaves, blocks, grease top drive, check gear oil. Centrilift install modified spooler. Check running order. Bring completion tools to rig floor. Pick up Motor gauge with centralizer on bottom. Connect 1/4" cap tubing to gauge. M/U 250 hp motor, upper and lower seals. Fill motor and seals with oil. Pull ESP cable through sheave and connect pothead. M/U gas seperator, 3 pump assembly, ported discharge head, and bolt on discharge with pup joint. Connect cap tubing to discharge head. Test ESP cable - good. 12/5/2019 - Thursday Cont. RIH with 2-7/8" EUE 8rd 6.5# L-80 ESP assembl as per detail from 3,283'to 7,866'. Check ESP cable continuity every 1,000'. Cont. adding 10 bph fluid to backside. Splice ESP cable to new spool. Cont. RIH with 2-7/8" EUE 8rd, 6.5#, L- 80 ESP assembly as per detail from 7,866'to 13,462'. Check ESP cable continuity every 1000'. Cont. adding 10 bph fluid to backside. M/U hanger and pup joint. Terminate control line, connectto penetrator and test. Land hanger at 13,493' with pigtail and test ESP cable. RILDS. R/D spooling unit. PUW 130K, SOW 68K Total Cannon Clamps used 222. Deflate airboot, pull riser. Break bolts on bottom of spacer spool. N/D BOPE: Blow down choke and kill lines, remove from stack. Break BOP bolts, stand back on stand and secure. Pull DSA. 12/6/2019 - Friday Continue nipple up dry hole tree. Set TWC and test same 500/5,000 psi w/ good test. Pull TWC. Freeze protect tbg w/ 20 bbls diesel, freeze protect IA w/ 90 bbls diesel (well on vac both tbg/IA post freeze protect). Secure well and release rig @ 12:00 hrs. 12/7/2019 -Saturday No operations to report. 12/8/2019 -Sunday No operations to report. 12/9/2019 - Monday No operations to report. 12/10/2019 -Tuesday No operations to report. H Ililcaro Alaska, LLC Orig. KB Elev.: 48.35'/ GL Bev: 13.4' (N27E) I IE ' 3 , i 4 s 6 7&8 9 ;10&11 ,e KUPASa da 7" TD=14,224 (MD) / To 7,50Y(TVD) PBTD =14,107 (MD) / PBTD = 7,41,V(TVD) SCHEMATIC Milne Point Unit Well: MPU F-45 Last Completed: 12/6/2019 PTD: 195-058 TREE & WELLHEAD Treet Cameron 2-9/16" 5M Wellhead 11" SM FMC Gen 5, w/ 7" x 11" Tbg. Hngr., 2-7/8" EUE Beef Threads T&B, 2-1/2" CIW "H" BPV profile OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) 30" Hole 9-5/8" 1300 sx PF'E', 250 sx Class'G'; 250 sx PF'E' 12-1/4" Hole 7" 225 sx Class 'G' 8-1/2" Hole CASING DETAIL Size Type Wt/Grade/Conn Drift ID Top Btm BPF 20" Conductor 91.1 / NT80LHE / N/A N/A Surface 113' 13,419' 9-5/8" Surface 40 / L-80 / BTC 8.679 Surface 6,678' 0.07" V5% 7 Production 26 / L-80 / NSCC 6.151 Surface 14,192' 0.0 TUBING DETAIL 2-7/8" Tubing 6.5 / L-80 /EUE Srd 2.347 Surface 13,493' 0.0058 WELL INCLINATION DETAIL KOP @ 1,100' Max Hole Angle= 73" from 4500'— 11,700' Hole Angle through perf interval = 36° STIMULATION SUMMARY 9/23/95 —147 M lbs. 16/20 Carbolite @ 40bpm — no screen out. JEWELRY DETAIL No Depth Item 1 195' GLM STA# 2: 0.25" OV 2 13,277' GLM STA# 1: Dummy 3 13,367' 2-7/8" XN-Nipple(2.205 No-go ID) 4 13,419' Bolt On Discharge Head: GPDIS 5 13,420' Ported Discharge Head: 6 13,421' Pump 3: 538SXD/41P23 7 13,427' Pump 2: 538SXD/119P23 8 13,445' Pump 1: 538PMSXD/20GINPSHH 9 13,455' Gas Separator: GRSFTX SO 13,458' Upper Tandem Seal: UTGSB3DB 11 13,465' Lower Tandem Seal: LTGSB3DB 12 13,472' Motor: XP 250Hp/ 2,505V/ 61A 13 13,488' Zenith Motor Gauge & Centralizer: Bottom @ 13,493' PERFORATION DFTAII Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date---Ttatus Kuparuk Al 13,781' 13,865' 7,148' 7,216' 84 8/19/1995 Open Ref Log: 08/19/95 GR/CCL-22gm. Jumbo let (BH) Charges @ 600 Phasing Random Orientation — EHD=0.76" / TTP=6.4" Mid -pert = 7186' TVD / 12,823' MD GENERAL WELL INFO TESP 9-2255"12/6/2019 d Casedors 27E -07/28/95 letion Iby Nabors 4ES 1/19/1996 by Nab10/12/2000 by Nab4/12/2004 by Nab6/19/2006 by Nord16/2016 by Inno2/6/2019 Revised By TDF 1/2/2020 THE STATE OIALASKA GOVERNOR MIKE DUNLEAVY Chad Helgeson Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Milne Point Field, Kuparuk River Pool, MPU F-45 Permit to Drill Number: 195-058 Sundry Number: 319-517 Dear Mr. Helgeson: Alaska Oil and Gas Conservation Commission 333 West seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www. o ogc c. a I aska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, \� Jere rice Chair l DATED this 1day of November, 2019. IBDMs1O" NOV 18 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS RECEIVED NOV 12 2019 AOGCC 1. Type of Request: Abandon ElPlug Perforations ❑ `Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend ❑ Perforate 0 Other StimulatePull Tubin ❑ g ❑ Change Approved Program ❑� Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ESP Change -out ❑ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Hilcorp Alaska LLC Exploratory ❑ Development Q . Stratigraphic ❑ Service ❑ 195-058 ' 3. Address: 3800 Centerpoint Dr, Suite 1400 6. API Number: Anchorage Alaska 99503 50-029-22556-00-00 " 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? C.O. 432D ' Will planned perforations require a spacing exception? Yes ❑ No Q MILNE PT UNIT F-45 ' 9. Property Designation (Lease Number): 10. Field/Pool(s): ADL0025509 / ADL0355018 Milne Point/ Kuparuk River Oil ' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 14,220' 7,502' 14,107' 7,414' 985 N/A N/A Casing Length Size MD TVD Burst Collapse Conductor 76' 20" 110' 110' N/A N/A Surface 6,645' 9-5/8" 6,678' 4,381' 5,750psi 3,090psi Production 14,159' 7" 14,192' 7,480' 7,240psi 5,410psi Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): See Schematic See Schematic 2-7/8" 6.5# / L-80 / EUE 8rd 13,591' Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): N/A and N/A N/A and N/A 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ DevelopmentE] ' Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 11/28/2019 ' OIL ❑✓ WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Chad Helgeson Contact Name: David Haakinsonj Authorized Title: Operations Manager Contact Email: dhaakinson hi Cr .Com Contact Phone: 777-8343 � Authorized Signature: I .,/-' Date: 11/12/2019 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness JSundry Number: Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: IBDMS P NOV 18 10119, Post Initial Injection MIT Req'd? Yes No - _ ,..(— L✓/ 3 tl— -7�) ❑° �1 Spacing Exception Required? Yes ❑ Subsequent Form Required: APPROVED BY Approved by: , COMMISSIONER THE COMMISSION Date. 1� �.v For�.r -403 Revised 4/2017 ,�,Z 1(13-11 Approved applicatOiRIGf.© he date of approval. (y/ Submit Form and Attachments in Duplicate n frilmu p Alaska, lb ESP Change -Out Well: MPU F-45 Date: 11-12-19 Well Name: MPU F-45 API Number: 50-029-22556-00 Current Status: Shut-in ESP Producer Pad: F -Pad Estimated Start Date: November 281", 2019 Rig: ASR#1 Reg. Approval Req'd? Yes Date Reg. Approval Rec'vd: Regulatory Contact: Tom Fouts Permit to Drill Number: 195-058 First Call Engineer: David Haakinson (907) 777-8343 (0) (307) 660-4999 (M) Second Call Engineer: Taylor Wellman (907) 777-8449 (0) (907) 947-9533 (M) AFE Number: Job Type: ESP Swap Current Bottom Hole Pressure: Maximum Expected BHP: MPSP: Max Inclination Max Dogleg: BPV Profile: 1,615 psi @ 7,150' TVD 1,700 psi @ 7,150' TVD 985 psi 73- @ 10,315' MD 8.8'/100ft @ 13,225' MD 2-1/2" CIW Type H Measured Downhole SBHP (10/7/9) 14.34 PPG Reservoir Pressure Build-up 14.57 PPG Gas Column Gradient (0.1 psi/ft) Brief Well Summary: MPU producer F-45 well was drilled and completed as a Kuparuk producer in 1995. The last ESP completion was installed in January 2016 and failed in September 2019 due to an electrical ground. Previous ESP failures have been due to a mixture of pump failures due to sand/scale as well as previous ESP cable failures. The well has significant dog -legs from 13,100' to 13,580' that may be causing cable wear. The longest pump run-time was 9 years from 2006 to 2015. During that period, a considerable effort was made to maintain a proper scale inhibition program. During no other interval was a scale program maintained, and the average pump life was approximately 3 -years. After the well is turned online, a water sample analysis will be performed to determine if the well should be back on a scale inhibition program. Notes Regarding Wellbore Condition • The 7" production casing passed an MIT to 2,000 psig on 1/14/16 o Utilized 7" test packer set at 13,000' MD. Offset Injection Support: o F-88: Online, injecting 2,000 BWPD. o F-30: Online, injecting 2,900 BWPD. Fault between wells; may have a slight interaction. Objective: • Pull 2-7/8" Tubing String, P17 ESP, and 210 HP motor • Add Perforations • Install new Baker Hughes 250 HP motor, 160 -stage P23SXD ESP, and new 2-7/8" tubing. , Brief RWO Procedure: 1. RU E -line to perforate the Al sands. a. PT PCE to 250 psig Low/2,500 prig High b. RIH with GR and CCL for drift and tag with 25' dummy gun L RIH as deep as possible for drift and tag. Need to ensure that a depth of 13,920' is reached H Ililearn Alaska, LI) ESP Change -Out Well: MPU F-45 Date: 11-12-19 ii. Pull up -hole to 10,850' MD for correlation run and tie into GR/CCL log dated 08-19- 1995. iii. Short Joint (21') located at ±13,593' MD c. RIH with GR, CCL, and guns. L Currently planning on 3-1/8" or 3-3/8" 6 SPF with 60° phasing. ii. Send gun/tool-string worksheet to engineering for review. d. RIH to ±13,920' MD and log up -hole to ±13,500' MD for confirmation run. i. Contact Engineer David Haakinson (307-660-4999) and Geologist Radu Girbacea (907-230-9490) prior to perforating. e. RIH to ±13,920' MD and pull up -hole to perforating depth. f. Perforate interval as followed: Zone Sand Top (MD) Bottom (MD) Top (TVD) Bottom (TVD) Length Kuparuk Al ±13,865' ±13,902' ±7,216' ±7,246' 1 ±37' g. POOH and LD perforating guns. i. Document condition of fired guns including any damage or un -fired charges. h. RD E -line Attachments: 1. As -built Schematic n Ifilcoru Aloekn, LLC Orig. KB Elev.: 48.35'/ GL Bev.: 13.4' (N27E) TD=14,2201 (MD) / TD=7,502'(7VD) PBTD=14,107 (MD) / PBI'D= 7,414'(TVD) PROPOSED Milne Point Unit Well: MPU F-45 Last Completed: 1/16/2016 PTD: 195-058 TREE & WELLHEAD Tree Cameron 2-9/16" 5M Wellhead 11" SIM FMC Gen 5, w/7"x11"Tbg. Hngr., 2-7/8" EUE 8rd Threads T&B, 2-1/2" CIW "H" BPV profile OPEN HOLE/ CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) 30" Hole 9-5/8" 1 1300 sx PF 'E', 250sx Class 'G', 250sx PF 'E' 12-1/4" Hole 7" 225 sx Class 'G' 8-1/2" Hole CASING DETAIL Size TypeWt/ Grade/ ConnDrift ID Top Btm BPF 20" Conductor 91.1/NTiii LHE/N/A N/A Surface 113' .0355 9-5/8" Surface 40/L-80/BTC 1 8.679 1 Surface 6,678' 0.0759 7" Production 26/L-80/NSCC 1 6.151 1 Surface 1 14,192' 0.0383 TUBING DETAIL 2-7/8" Tubin 6.5/L-80/EUE Brd 2.347 Surf ±13,480' 0.00579 WELL INCLINATION DETAIL KOP @ 1,100' Max Hole Angle = 73° from 4500'— 11,700' Hole Angle through pert interval = 36" STIMULATION SUMMARY 9/23/95-147 M Its. 16/20 Carbolite @ 40bpm — no screen out. JEWELRY DETAIL No Depth Item 1 ±200' GLM STA# 2:0.25' OV 2 (13,290' GLM STA# 1: Dummy 3 ±13,365' 2-7/8" XN-Nipple(2.25 No-go ID) 4 ±13,425' Discharge Head: 5 ±13,420' Pump: 6 ±13,440' Gas separator: 7 ±13,545' Upper Tandem Seal: 8 ±13,455' Lower Tandem Seal: 9 ±13,460' Motor: SO ±13,475' Sensor: 11 ±13,480' 1 Centralizer: Bottom @ ±13,592' PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (ND) Btm (TVD) FT Date Status Kup.aruk Ai 13,781' 1 13,865' 1 7,148' 1 7,216' 1 84 1 8/19/1995 Open ±13,865' 1 ±13,902' 1 ±7,216' 1 ±7,246' 1 ±37 1 Future Future Ref Lag: 08/19/95 GR/CCL -22gm. lumbo Jet (BH) Charges @ 60° Phasing Random Orientation -EHDb,76" /TTP=6.4" Mid-perf - 7186' ND / 12,823' MD GENERAL WELL INFO F 50-029-22556-00-00 ed and Cased by Nabors 27E -07/28/95 Completion Installedby Nabors4ES1/19/1996 ESP by Nabors 4ES 10/12/2000 ESP by Nabors 4ES 04/12/2004 RWO ESP by Nabors 4ES 06/19/2006 RWO ESP by Nordic #31/16/2016 Revised By TDF 11/12/2019 THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Chad Helgeson Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Milne Point Field, Kuparuk River Oil Pool, MPU F-45 Permit to Drill Number: 195-058 Sundry Number: 319-471 Dear Mr. Helgeson: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, "V Jere m Price Chair �2 DATED thisJ—✓ day of October, 2019. 4BDMSS'� OCT 2 5 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25 280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑r Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ESP Change -out Q 2. Operator Name: 4. Current Well Class: A 5. Permit to Drill Number: Hilcorp Alaska LLC Exploratory p ry ❑ Development ❑✓ Stratigraphic ❑ Service ❑ 195-058 3. Address: 3800 Centerpoint Dr, Suite 1400 6. API Number: Anchorage Alaska 99503 50-029-22556-00-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? C.O. 432D Will planned perforations require a spacing exception? Yes ❑ No ❑r MILNE PT UNIT F-45 9. Property Designation (Lease Number): ADL -000 6q 10. Field/Pool(s): ADL0355018 guq Milne Point / Kuparuk River Oil 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 14,220' 7,502' 14,107' 7,414' 985 N/A N/A Casing Length Size MD TVD Burst Collapse Conductor 76' 20" 110' 110' N/A N/A Surface 6,645' 9-5/8" 6,678' 4,381' 5,750psi 3,090psi Production 14,159' 7" 14,192' 7,480' 7,240psi 5,410psi Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing See Schematic See Schematic 2-7/8" 6.5# / L-80 / EUE 8rd 13,591' Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): N/A and N/A N/A and N/A 12. Attachments: Proposal Summary D Wellbore schematic ❑r 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketchr ❑ Exploratory ❑ Stratigraphic ❑ Development2l Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 12/1/2019 OIL ❑r WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Chad Helgeson Contact Name: David Haakinson / Authorized Title: Operations Manager Contact Email: dhaakinsorl N1 or .00m Contact Phone: 777-8343 Authorized Signature: - ,: ,� Date:(;) 1 - " I COMMISSION USE O LY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 01 Plug Integrity ❑ BOP Test Mechanical Integrity Test ❑ Location Clearance ❑ Other.•,{.— / RBDMS ( /OCT 2 5 2019 Post Initial Injection MIT Req'd? Yes ❑ No ❑ Spacing Exception Required? Yes No Subsequent Form Required: J APPROVED BY Approved by: J COMMISSIONER THE COMMISSION Date: 0 1� ORIGINAL lj z'lf o 0-403 (wised 4/201 A Submit Form and Approved application is valid for 12 months from the datetoof�apRroval. Attachments in Duplicate Qh 0. hA 11G /In .n Ililwru Alaska. LU ESP Change -Out Well: MPU F-45 Date: 10-14-19 Well Name: MPU F-45 API Number: 50-029-22556-00 Current Status: Shut-in ESP Producer Pad: F -Pad Estimated Start Date: December 111, 2019 Rig: ASR#1 Reg. Approval Req'd? Yes Date Reg. Approval Rec'vd: Regulatory Contact: Tom Fouts Permit to Drill Number: 195-058 First Call Engineer: David Haakinson (907) 777-8343 (0) (307) 660-4999 (M) Second Call Engineer: Taylor Wellman (907) 777-8449 (0) (907) 947-9533 (M) AFE Number: Job Type: ESP Swap Current Bottom Hole Pressure: Maximum Expected BHP: MPSP: Max Inclination Max Dogleg: BPV Profile: 1,615 psi @ 7,150' TVD 1,700 psi @ 7,150' TVD 985 psi 73" @ 10,315' MD 8.8°/100ft @ 13,225' MD 2-1/2" CIW Type H Measured Downhole SBHP (10/7/9) 14.34 PPG Reservoir Pressure Build-ups) 4.57 PPG Gas Column Gradient (0.1 p ' ft Brief Well Summary: MPU producer F-45 well was drilled and completed as a Kuparuk producer in 1995. The last ESP completion was installed in January 2016 and failed in September 2019 due to an electrical ground. Previous ESP failures have been due to a mixture of pump failures due to sand/scale as well as previous ESP cable failures. The well has significant dog -legs from 13,100' to 13,580' that may be causing cable wear. The longest pump run-time was 9 years from 2006 to 2015. During that period, a considerable effort was made to maintain a proper scale inhibition program. During no other interval was a scale program maintained, and the average pump life was approximately 3 -years. After the well is turned online, a water sample analysis will be performed to determine if the well should be back on a scale inhibition program. Notes Regarding Wellbore Condition • The 7" production casing passed an MIT to 2,000 psig on 1/14/16 o Utilized 7" test packer set at 13,000' MD. • Offset Injection Support: o F-88: Online, injecting 2,000 BWPD. o F-30: Online, injecting 2,900 BWPD. • Fault between wells; may have a slight interaction. Objective: • Pull 2-7/8" Tubing String, P17 ESP, and 210 HP motor. • Install new Baker Hughes 250 HP motor, 160 -stage P23SXD ESP, and new 2-7/8" tubing. Pre -Rig Procedure: 1. RU LRS and PT lines to 3000 psi. 2. Pump one IA volume (422 bbls) with 8.3 ppg source -water down IA to formation 3. Clear and level pad area in front of well. Spot rig mats and containment. 4. RD well house and flowlines. Clear and level area around well. 5. Confirm well is dead. Freeze protect tubing/casing as needed with 60/40 McOH. ESP Change -Out rlacurn Alaska, LbWell: MPU F-45 Date: 10-14-19 a. Freeze protect is up to the discretion of the Wellsite Supervisor depending on timing for arrival of the ASR. 6. RD Little Red Services. 7. RU crane. Set BPV. ND Tree. NU BOPE. RD Crane. 8. NU BOPE house. Spot mud boat. Brief RWO Procedure: 9. MIRU Hilcorp ASR #1 WO Rig, ancillary equipment and lines to returns tank. 10. Check for pressure and if 0 psi, pull BPV. If needed, bleed off any residual pressure off tubing and casing. If needed, kill well w/ 8.3 ppg source -water prior to pulling BPV. 11. Set TWC. 2. Test BOPE to 250 psi Low/ 2,500 U"igh, annular to 250 psi Low/ 2 � si High (hold each ram/valve and test for S -min). Record accumulator pre -charge pressures and chart tests. �J PF a. Notify AOGCC 24 hours in advance of BOP test. �PSr b. Perform Test per ASR 1 BOP Test Procedure dated 11/03/2015. c. Confirm test pressures per the Sundry Conditions of approval. d. Test VBR ram on 2-7/8" test joint. e. Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 13. Contingency: If BOPE test fails a. Notify Operations Engineer (Hilcorp), Mr. Guy Schwartz (AOGCC) and Mr. Jim Regg (AOGCC) via email explaining the wellhead situation prior to performing the rolling test. AOGCC may elect to send an inspector to witness test. b. With stack out of the test path, test choke manifold per standard procedure c. Conduct a rolling test: Test the rams and annular with the pump continuing to pump, (monitor the surface equipment for leaks to ensure that the fluid is going down -hole and not leaking anywhere at surface.) d. Hold a constant pressure on the equipment and monitor the fluid/pump rate into the well. Record the pumping rate and pressure. e. Once the BOP ram and annular tests are completed, test the remainder of the system following the normal test procedure (floor valves, gas detection, etc.) f. Record and report this test with notes in the remarks column that the tubing hanger/BPV profile/ penetrator wouldn't hold pressure and rolling test was performed on BOP Equipment and list items, pressures and rates. 14. Bleed any pressure off casing to returns tank. Pull TWC. Kill well w/ 8.3 ppg source -water as needed. 15. Rig up spoolers for ESP #2 RD cable. a. Baker Hughes representative should be onsite for ESP pull. 16. MU landing joint or spear and PU on the tubing hanger. a. The PU weight during the 2016 ESP completion was 125K lbs / SOF = 70K lbs (Includes Nordic 3 Block Weight of 35K). b. If needed, circulate (long or reverse) pill with lubricant, source -water, and/or baraclean pill prior to laying down the tubing hanger. 17. Recover the tubing hanger. IIikom Alaska, LLI ESP Change -Out Well: MPU F-45 Date: 10-14-19 Contingency (If a rolling test was conducted): MU new hanger or test plug to the completion tubing. Re -land hanger (or test plug) in tubing head. Test BOPE per standard procedure. a. Evaluate pulled tubing hanger for possible thread damage. If any damage is found, dispose of tubing hanger and contact well head specialist for replacement. 18. POOH and lay down the 2-7/8" tubing. Lay down ESP and motor. a. Look for a blow-out on the ESP cable. i. Electrically test the penetrator. Ran previously used penetrator. b. Note any sand or scale inside or on the outside of the ESP on the morning report. c. Look for over -torqued connections from previous tubing runs. d. The completion has the following amount of clamps/guards/cap-string: i. 220 Cross Collar Cannon Clamps ii. 5 Protectolizers iii. 3 Flat Guards e. 2 Stainless Steel Bands f. Send all tubing to G&I for washing and disposal. i. Re -use GLMs and XN Nipple if in good condition. 19. PU new ESP and RIH on 2-7/8" 6.5# L-80 tubing. Plan to set base of ESP assembly at ± 13,480' MD. a. Tubing caliper results will determine if new or reused tubing will be utilized. b. Install additional cannon clamps from 13,580' to 13,100' MD for added cable protection in high dog- leg interval. 20. Completion tally as followed. Reference the F-45 material tracker. a. Upper 2-7/8"x 1" Side -pocket GLM @ ± 200' MD with 0.25" OV c 1 b. 2-7/8" tubing c. Lower 2-7/8"x 1" Side -pocket GLM with Dummy GLV d. 2 joints of 2-7/8" tubing e. 2-7/8" XN (2.205" No -Go) Nipple f. 1 joint of 2-7/8" tubing g. Downhole gauge for discharge temperature and pressure. i. Connected with a jumper from the lower sensor. Does not require a separate tech -wire. h. Baker Hughes 160 stage P23SXD ESP i. Baker Hughes 20 stage GINPSH ESP j. Gas Separator k. 250 HP Baker Hughes 562XP Motor 1. Motor gauge m. Base of ESP centralizer @ ± 13,480' MD 21. Land tubing hanger. RILDS. Lay down landingjoint. Note Pick-up and slack -off weights on tally. 22. Set BPV. Post -Rig Procedure: 23. RD mud boat. RD BOPE house. Move to next well location. H II&.m Alxeki. LL 24. RU crane. ND BOPE. ESP Change -Out Well: MPU F-45 Date: 10-14-19 25. NU existing Seaboard 2-9/16" 5,000# tree. Test tubing hanger void to 500 psi low/5,000 psi high. 26. Pull BPV. 27. RD crane. Move 500 bbl returns tank and rig mats to next well location. 28. Replace gauge(s) if removed. 29. Turn well over to production. RU well house and flowlines. Attachments: 1. As -built Schematic 2. Proposed Schematic 3. BOP Schematic H cora Alaska, LLC Orig. KB Elev.: 48.35'/ GL Elev.: 13.4' (N27E) TD =14,220 (MD) / TD = 7,502'MM) PEI=14,107' (MD)/ PBTD=7,414'(TVD) Milne Point Unit SCHEMATIC Well: MPU F-45 Last Completed: 1/16/2016 PTD: 195-058 TREE & WELLHEAD OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) 30" Hole 9-5/8" 1300 sx PF'E', 250 sx Class'G', 250 sx PF'E' 12-1/4" Hole 7" 225 sx Class'G' 8-1/2" Hole CASING DETAIL Size Tree I Cameron 2-9/16" 5M Drift ID Top Wellhead 11"SM FMC Gen S, w/7"x11"T6g. Hngr., 2-7/8" EUE 8rd Threads T&B, 2-1/2" CIW "H" BPV profile 20" OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) 30" Hole 9-5/8" 1300 sx PF'E', 250 sx Class'G', 250 sx PF'E' 12-1/4" Hole 7" 225 sx Class'G' 8-1/2" Hole CASING DETAIL Size Type Wt/Grade/Conn Drift ID Top Btm BPF 20" Conductor 91.1/ NT80LHE / N/A N/A Surface 113' .0355 Discharge Head: GPDIS Surface 40/L-80/BTC 8.679 Surface 6,13 0.0759 7" Production 26/L-80/NSCC 6.151 Surtace 14,192 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5 / L-80/EUE 8rd 2.347 Surf 13,591' 0.00579 WELL INCLINATION DETAIL KOP @ 1,100' Max Hole Angle = 73" from 4500'-11,700' Hole Angle through perf interval = 36" STIMULATION SUMMARY 9/23/95 —147 M lbs. 16/20 Carbolite @ 40bpm —no screen out. JEWELRY DETAIL No Depth Item 1 140' GLM STA# 2: Camco 2-7/8" x 1" Sidepocket KBMM DMY 2 13,370' GLM STA# 1: Camco 2-7/8" x 1" Sidepocket KBMM OPEN 3 13,489' 2-7/8"X-N-Nipple(2.25 No-go ID) 4 13,532' Discharge Head: GPDIS 5 13,533' Pump: 137P17/SXD 6 13,552' Gas Separator: GRSFTX AR H6 7 13,556' Upper Tandem Seal: GSB3DBUT 5B/SB PFSA 8 13,563' Lower Tandem Seal: GSB3DBLT SB/SB PFSA CL5 9 13,570' Motor: MSP1-250— 210HP/ 2,380V/ 53A 10 13,587' Sens or: Phoenix XT150 11 13,589' Centralizer: Bottom @ 13,591' PERFORATION DETAIL Sands Top (MD) III (MD) Top (TVD) I1m (TVD) FT Date Status Kup.ASands 13,781' 1 13,865' 1 7,152' 1 7,220' 1 84 1 8/19/1995 1 Open Ref Log: 08/19/95 GR/CCL— 22gm. Jumbo let (BH) Charges @ 60' Phasing Random Orientation — EHD=0.76" / 7P=6.4" Mid -pert = 7186' TVD / 12,823' MD GENERAL WELL INFO API: 50-029-22556-00-00 Drilled and Cased by Nabors 27E -07/28/95 ESP Completion Installed by Nabors 4E5 1/19/1996 RWO ESP by Nabors 4ES 10/12/2000 RWO ESP by Nabors 4E5 04/12/2004 RWO ESP by Nabors 4ES 06/19/2006 RWO ESP by Nordic #3 1/16/2016 Revised By DAH 10/15/19 K corp Alaska, LLC Orig. KB Elev.: 48.35'/ GL Bev.: 13.4' (N27E) TD =14,220' (MD) /TD = 7,502'(TVD) PBTD =14,107 (MD) / PBTD = 7,414'(TVD) Milne Point Unit PROPOSED Well: MPU F-45 Last Completed: 1/16/2016 PTD: 195-058 TREE & WELLHEAD OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) 30" Hole 9-5/8" 1300 sx PF 'E', 250 sx Class 'G', 250 sx PF 'E' 12-1/4" Hole 7" 225 sx Class 'G' 8-1/2" Hole CASING DETAIL Size Tree I Cameron 2-9/16"SM Drift ID Top Wellhead 11"5M FMC Gen 5, w/7"x11"Tbg. Hngr, 2-7/8" EUE 8rd Threads T&B, 2-1/2" CIW "H" BPV profile 20" OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) 30" Hole 9-5/8" 1300 sx PF 'E', 250 sx Class 'G', 250 sx PF 'E' 12-1/4" Hole 7" 225 sx Class 'G' 8-1/2" Hole CASING DETAIL Size Type Wt/ Grade/ Conn Drift ID Top Btm BPF 20" Conductor 9-11/NT80LHE/N/A N/A Surface 113' .0355 9-5/8" Surface 40/L-80/BTC 8.679 Surface 6,678' 0.0759 7" Production 26/L-80/NSCC 6.151 Surface 14,192' 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5/L-80/EUE8rd 1 2.347 1 Surf ±13,480' 0.00579 WELL INCLINATION DETAIL KOP@ -L ,100' Max Hole Angle = 73° from 4500'— 11,700' Hole Angle through perf interval = 36" STIMULATION SUMMARY 9/23/95 —147 M lbs. 16/20 Carbolite @ 40bpm — no screen out. JEWELRY DETAIL No Depth Item 1 ±200' GLM STA# 2:0.25" OV 2 ±13,290' GLM STA# 1: Dummy 3 ±13,365' 2-7/8" XN-Nipple (2.25 No-go ID) 4 ±13,425' Discharge Head: 5 ±13,420' Pump: 6 ±13,440' Gas Separator: 7 ±13,545' Upper Tandem Seal: 8 ±13,455' Lower Tandem Seal: 9 ±13,460' Motor: 10 ±13,475' Sensor: 11 ±13,480' Centralizer: Bottom @±13,592' PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm ITVD)FT Date Status Kup.ASands 13,781' 13,865' 7,152' 7,220' 84 8/19/1995 Open Ref Log: 08/19/95 GR/CCL— 22gm. Jumbo Jet (BH) Charges @ 60' Phasing Random Orientation — EHD=0.76" / TTP=6.4" Mid -ped= 7186' TVD / 12,823' MD GENERAL WELL INFO API: 50-029-22556-00-00 Drilled and Cased by Nabors 27E - 07/28/95 ESP Completion Installed by Nabors 4ES 1/19/1996 RWO ESP by Nabors 4ES 10/12/2000 RWO ESP by Nabors 4ES 04/12/2004 RWO ESP by Nabors 4ES 06/19/2006 RWO ESP by Nordic #3 1/16/2016 Revised By DAH 10/15/2019 H 11" BODE Milne Point ASR Rig 1 ROPE 2019 Updated 5/14/2018 ?-7/8" x 5" VBR ind es STATE OF ALASKA • AlkA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon U Plug Perforations L] Fracture Stimulate L] Pull Tubing Ld Operations shutdown L] Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing❑ Change Approved Program ❑ Plug for Redrill ❑ srforate New Pool ❑ Repair Well Q Re-enter Susp Well ❑ Other: ESP Changeout 0 2. Name: 4.Well Class Before Work: 5.Permit to Drill Number: Hilcorp Alaska LLC Development Q Exploratory❑ 195-058 3.Address: Stratigraphic El Service❑ 6.API Number: 3800 Centerpoint Dr,Suite 1400 Anchorage,AK 99503 50-029-22556- 0 �9 7.Property Designation(Lease Number): 8.Well Name and Number: ;. ADL 355018 MPU KR F-45 y 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): FEB A 6 2016 N/A Milne Point/Kuparuk River Oil 11.Present Well Condition Summary: AOGCC Total Depth measured _ 14,220 feet Plugs measured N/A feet true vertical 7,502 feet Junk measured N/A feet Effective Depth measured 14,107 feet Packer measured N/A feet true vertical 7,414 feet true vertical N/a feet Casing Length Size MD TVD Burst Collapse Conductor 76' 20" 113' 113' N/A N/A Surface 6,645' 9-5/8" 6,678' 4,381' 5,750psi 3,090psi Production 14,159' 7" 14,192' 7,480' 7,240psi 5,410psi Perforation depth Measured depth See Attached Schematic True Vertical depth See Attached Schematic SCANNED 1./, tit t` ,-i Tubing(size,grade,measured and true vertical depth) 2-7/8" 6.5#/L-80/EUE 8rd 13,591' 6,993' Packers and SSSV(type,measured and true vertical depth) N/A N/A N/A N/A 12.Stimulation or cement squeeze summary: N/A Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 164 43 963 300 229 Subsequent to operation: 200 110 1,213 300 222 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory❑ Development El Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Q Gas ❑ WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR Li WINJ ❑ WAG ❑ GINJ❑ SUSP❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 315-763 Contact Paul Chan Email pchanhilcorp.com Printed Name Bo York Title Operations Engineer t Signatureiit ii� Phone 777-8345 Date 2/15/2016 2 Z0.._" iii '°4 Form 10-404 Revised 5/2015 RBDMS LV FEB 1 8 2016 Submit Original Only • • • Milne Point Unit 111 SCHEMATIC Well: MPU F-45 Last Completed: 1/16/2016 Bacon)Alaska,LLC PTD: 195 058 TREE&WELLHEAD Orig.KB Elev.:48.35'/GL Elev.:13.4'(N27E) Tree Cameron 2-9/16"5M RT toTbg Spool=32.46' (N 27E) 11"5M FMC Gen 5,w/7"x 11"Tbg.Hngr.,2-7/8" Wellhead rt4,1 EUE 8rd Threads T&B,2-1/2"CIW"H"BPV profile 20° OPEN HOLE/CEMENT DETAIL 0; 2` 20" 250 sx of Arcticset I(Approx)30"Hole 1 ' 9-5/8" 1300 sx PF'E',250 sx Class'G',250 sx PF'E'12-1/4"Hole t- 7" 225 sx Class'G'8-1/2"Hole CASING DETAIL Size Type Wt/Grade/Conn Drift ID Top Btm BPF ` 7+ 20" Conductor 91.1/NT8OLHE/N/A N/A Surface 113' .0355 )a ,`,0( ``.14 9-5/8 * 9-5/8" Surface 40/L-80/BTC 8.679 Surface 6,678' 0.0759 00$1- r. 7" Production 26/L-80/NSCC 6.151 Surface 14,192' 0.0383 '_ � TUBING DETAIL f 2-7/8" Tubing 6.5/L-80/EUE 8rd 2.347 Surf 13,591' 0.00579 vt WELL INCLINATION DETAIL 1. °.,t. KOP@1,100' Max Hole Angle=73°from 4500'-11,700' Hole Angle through perf interval=36° tl '01 STIMULATION SUMMARY 9/23/95-147 M lbs.16/20 Carbolate @ 9-5/8"til Or 4obpm-no screen out. JEWELRY DETAIL No Depth Item 1 140' GLM STA#2:Camco 2-7/8"x 1"Sidepocket KBMM 2 13,370' GLM STA#1:Camco 2-7/8"x 1"Sidepocket KBMM Dummy 3 13,489' 2-7/8"XN-Nipple(2.25 No-go ID) 4 13,532' Discharge Head:GPDIS 5 13,533' Pump:137P17/SXD 6 13,552' Gas Separator:GRSFTX AR H6 7 13,556' Upper Tandem Seal:GSB3DBUT SB/SB PFSA 2 8 13,563' Lower Tandem Seal:GSB3DBLT SB/SB PFSA CL5 9 13,570' Motor:MSP1-250-210HP/2,380V/53A r 10 13,587' Sensor:Phoenix XT150 *. 11 13,589' Centralizer:Bottom @ 13,591' i" en 3 PERFORATION DETAIL a .< Sands Top(MD) Btm(MD) Top(TVD) Btm(TVD) FT Date Status Fo-� >' 4 Kup.A Sands 13,781' 13,865' 7,152' 7,220' 84 8/19/1995 Open LI 4'' Ref Log: 08/19/95 GR/CCL-22gm.Jumbo Jet(BH)Charges @ 60°Phasing Random Orientation-EHD=0.76"/TTP=6.4" LI ' 4 5 Mid-perf=7186'TVD/12,823'MD `"; ;i<; VIII :',t,6 .`i ►',7&8 SEI GENERAL WELL INFO P' API:50-029-22556-00-00 i °iDrilled and Cased by Nabors 27E -07/28/95 a ,, ,9 ESP Completion Installed by Nabors 4ES 1/19/1996 RWO ESP by Nabors 4ES 10/12/2000 o. >t RWO ESP by Nabors 4ES 04/12/2004 J(if ti*10&11 RWO ESP by Nabors 4ES 06/19/2006 RWO ESP by Nordic#3 1/16/2016 ,040y *-KUP A Sands « 14 Ta a TD=14,220'(MD)/TD=7,502'(TVD) PBTD=14,107'(MD)/PBTD=7,414'(1VD) Revised By PC 2/16/2016 • • Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MP F-45 Nordic#3 50-029-22556-00-00 195-058 1/10/16 1/16/16 Daily Operations: 1/6/2016-Wednesday No activity to report. 1/7/2016-Thursday No activity to report. 1/8/2016- Friday No activity to report. 1/9/2016-Saturday No activity to report. 1/10/2016-Sunday Rig move from L-Pad to F-45 spot over the hole @ 21:30. Nordic 3 was accepted on F-45 @ 21:30 hrs 1-10-2016. Berm up around cellar, adjust hand rails, spot cutting box, load pits with sea water. 550psi IA 500psi OA. Rig up drill site maintenance with lubricator and pull BPV. Rig up on L-45 to kill. Continue load hot sea water in pits. Install ESP hydraulic spooler onto rig floor with CH2 crane.Take on second load of hot seawater. Set kill tank. Continue to rig up, install hard line to kill tank. Clear kill line with air. Pressure test line 350psi low/2,500psi high (good). Pump down the tubing to verify that we are open. Line up the valves to pump down the back side. 30bbl of sea water(0 returns). Realign the valves to pump 515bb1 down the tubing. 1/11/2016- Monday Pump down the tubing to verify that we are open. Line up the valves to pump down the back side. 30bbl of sea water(0 returns). Realign the valves to pump. Pump 58 bbls down IA w/3 -1/4 bpm (no returns). Pump down tubing w/3 bpm, 180psi. Observed returns w/290 bbls away(some crude but very little). Pumped 436 bbls total down tbg. Line up & pump 85 bbls down IA. No returns. Pumped total of 611 bbls. Lost 500 bbls. Set BPV per Well Head Rep. ND Tree. NU BOPE. Continue to NU BOPE. Pull BPV& install TWC per Well Head Rep. Fill stack, purge system,full BOP body test.Test BOPE to 250psi low/3,000psi high f/5 charted minutes each test using 2-7/8" and 3-1/2" test jt. Annular was tested 250psi low/ 3,000psi high. Draw down test: System press. = 3,000psi-After closure = 1,850psi -200psi attained in 17 sec. - Full pressure attained in 91 seconds.4 bottles @ 2,050. RID test equipment. Pull TWC, P/U landing jnt. Install in hanger. Rig hose from the IA to the choke manifold. Open annulus (10psi) bleed off through choke manifold to gas buster(ten min to bleed off). Back out the lock downs, pull hanger to the floor pick up 126k minus top drive 90K.Terminate ESP cable. LID tubing hanger, rig up Baker Centrilift, drop 2.32" drift. POOH with 2-7/8 completion rack back in derrick. At 7,082' change out ESP 1/12/2016-Tuesday Continue POOH with ESP completion from 7,082'to ESP pump assembly. Inspect and rack 2-7/8"tbg in derrick. Use continuous hole fill @ 10 bph while POOH. Note: recover 2.32" drift on wire @ XN nipple. R/D ESP cable and secure spool. L/D pump assembly. Note: water/oil mixture found in tandem seal, upper tandem pump shaft stiff to turn (221 clamps, 6 protectolizers and 3 flat guard clamps recovered). Note: Continue with 10 bph hole fill. Install 9" ID wear bushing, RILDS. C/O from 2-7/8"to 3-1/2" handling equipment. M/U cleanout BHA, 3-1/2" mule shoe, XO, DBL pin sub, 2 boot baskets, 7" scraper, bit sub= 19.57'. PJSM, with crane C/O ESP spools on rig floor. Note: well support fluid shot well showing fluid level @ 2000'.TIH with cleanout BHA. Drift and single in the hole with 3-1/2" drill pipe to 11,182'. • • Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MP F-45 Nordic#3 50-029-22556-00-00 195-058 1/10/16 1/16/16 Daily Operations:1 ' "�� , � ra,7,.!:44471:41144 '+' "� � »K 10'7 � it: u 1/13/2016-Wednesday Continue to RIH w/cleanout assembly: Muleshoe, 2 boot baskets & 7" casing scraper while PU 3-1/2" DP to 13,705'. PUW 190k-SOW 102k. Pump 36 bbls 10.0 ppg saturated salt pill &chase w/90 bbls of 8.5 ppg seawater w/4 bpm, 350-720psi. Stand back 1 stand to 13,615' and service rig while allowing pill to soak. Fill hole from top while monitoring. Initial loss rate at 5 bph but increased to 60 bph. Circulate down DP w 5 b m 1 320 si, Unable toget returns w/ less than 2 bpm. p p / p_ , , p p Observed crude &gas to surface. Slow pump rate to 1.8 bpm keeping fluid below flowline & allowing gas to break out. Slowly increase rate back to 4 bpm &divert approximately 60 bbls of crude outside to slop tank. Continue to circulate hole clean. Pumped total of 443 bbls w/ 111 bbls lost down hole. Monitor well & blow down Top Drive. POH f/ 13,615' to 1,900' while filling at double displacement+ 10 bph. Continue POH L/D 63 jts 3-1/2" drill pipe from 1,900' to BHA, fill at double displacement+ 10 bph. L/D 7" scraper BHA. Note:very small amount of scale in boot baskets, otherwise clean. Load out tools. M/U 7" champ packer assembly, single in the hole with 63 jts 3-1/2" drill pipe to 1,890', continue to RIH with stands from derrick to 10,700', 1/14/2016-Thursday Continue to RIH &spot Champ test packer at 13,600'. PUW 175k-SOW 102k. Break circulation & pump w/4 bpm, 800psi vir to clean around packer& setting area. Pumped 40 bbls and observed returns. Pumped total of 50 bbls with 20 bbls crude V cap diverted outside. Setpacker at 13,600' with 3.1/2" RH turns. Pressure test 7" casing from 13,600'to surface with 2,000psi f/30 charted minutes. Good test. Bleed off pressure & release packer w/straight pull to 175k(up wt.). Circulate to remove any crude cap. Fill trip tank. POH LD 3-1/2" DP f/ 13,600'to 12,160',fill double displacement+ 10 bbls/hr on trip out. Continue POH L/D DP f/ 12,160'to 9,275'. PJSM, install FOSV. Cut &slip 63'ft of drilling line. Re-set and test crown saver. Continue POH L/D DP f/9,275'to surface, L/D packer, fill double displacement+ 10 bbls/hr on trip out. Load out tools, R/U and pull 9" wear bushing. Make tubing hanger dummy run per wellhead rep. 26.55'. Note: monitor and continue hole fill @ 10 bph. R/U handling equipment,elevators, power tongs, FOSV, etc. Load equipment in pipe shed. PJSM, M/U NEW ESP pump assembly,service pumps, M/U MLE, install flat guards and protectolizer. Meg test ESP cable. 1/15/2016- Friday RIH w/2-7/8" ESP completion to 5,950'.Test cable continuity every 2,000'. Continue to fill hole w/ 10 bbls/hr. Continue to RIH w/ ESP completion f/5,950'to 9,340'.Test continuity every 2,000'. Continue to fill hole w/10 bbls/ hr. Swap ESP cable spool from rig floor. R/U and splice ESP cable, meg test same,good. Continue to fill hole @ 10 bbls/ hr. Continue to RIH w/ ESP completion f/9,340'to 13,377'. M/U pup jts and GLM, continue to RIH to 13,555', M/U 2 pup jts, hanger and landing jt. Test continuity every 2,000'. Continue to fill hole @ 10 bbls/hr. M/U penetrator, splice and install connector to hanger, install final clamps, meg test cable. P/U 125K,S/O 70K. (total 427 jts 2-7/8 6.5# EUE tbg ran, 220 Cannon clamps, 5 protectolizers, 3 flat guards and 2 SS bands ran). Continue to fill hole @ 10 bbls/ hr. Land hanger 23.7' in with pump on depth @ 13,590.75'. • S Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MP F-45 Nordic#3 50-029-22556-00-00 195-058 1/10/16 1/16/16 Daily Operations: 1/16/2016-Saturday Land hanger& set BPV per Well Head Rep. ND BOPE: ND riser. Break Annular cap. Open ram doors & remove upper, lower and blind rams. Prep ram cavaties for storage. Make breaks on BOP flange bolts. Rack back BOP's on stump. NU tree.Test tree void to 500psi low/5,000psi high, 10 min each per Well Head Rep. Centrilift make final ESP checks, flush circulating lines with fresh water and blow down same. Clean trip tank. R/D ESP cable sheaves, PJSM, with crane remove ESP spool and frame from rig floor. Warm up move system. Load out Centrilift tools. R/D hardline, cuttings box and flow back tank. Finish sucking out pits. Roll up winter tarps. Notify F-pad DSO before pulling off F-45,jack up rig. pull off well. Rig released @ 21:00 hrs. 1/17/2016-Sunday No activity to report. 1/18/2016- Monday No activity to report. 1/19/2016-Tuesday No activity to report. � QF •7� • • w\����j �sT THE STATE Alaska Oil and Gas ofALConservation Commission AsKAL 5} = 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907,279.1433 ALAS'" Fax: 907.276.7542 www.aogcc.alaska.gov Bo York SCA- � Area Operations Manager 0 6G Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Milne Point Field, Kuparuk River Oil Pool, MPU KR F-45 Sundry Number: 315-763 Dear Mr. York: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P. Foerster Chair DATED this' clay of December, 2015 Encl. RBDMSUUDEC 312015 RECEIVED • STATE OF ALASKA DEC Zp, ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 97s !L(sa( i s 20 AAC 25.280 1.Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑✓ Operations shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing 0 ' Change Approved Program❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: _ESP Changeout_[21. 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: Hilcorp Alaska,LLC - Exploratory ❑ Development Q • 195-058• -- 3.Address: 6.API Number: Stratigraphic El EI 3800 Centerpoint Drive,Suite 1400 Anchorage,AK 99503 50-029-22556-00-00. 7. If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? C.O. 432C ' Will planned perforations require a spacing exception? Yes ❑ No ❑✓ J/ MPU KR F-45- 9.Property Designation(Lease Number): 10. Field/Pool(s): ADL 355018 Milne Point/ Kuparuk River Oil 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): • 14,220' • 7,502' •14,107' •7,414' 6.6_84ase. None None Casing Length Size MD TVD Burst Collapse Structural Conductor 76' 20" 110' 110' Surface 6,645' 9-5/8" 6,678' 4,381' 5750 3090 Intermediate Production 14,159' 7" 14,191' 7,480' 7240 5410 Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 13,781'-13,865' • 7,152'-7,221' 2-7/8" L-80 13,605 Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): None - NIA 12.Attachments: Proposal Summary Q Wellbore schematic Q 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch 0 Exploratory ❑ Stratigraphic ❑ Development DI• Service ❑ 14. Estimated Date for 15.Well Status after proposed work: 1/3/2016 Commencing Operations: OIL 0, WINJ ❑ WDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: N/A GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: N/A GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Paul Chan '`' Email pchan a hilcorp.corn Printed Name Bo York Title Area Operations Manager Signal iF191 "-,1Z fa Yu, Phone 777-8345 Date I Z/2 3 )IS COMMISSION USE ONLY Condition of approval: Notify Commission so that a representative may witness Sundry Number. 3i6- -7(. Plug Integrity ❑ BOP Test V Mechanical Integrity Test ❑ Location Clearance ❑ Other: 3660 r.„ Post Initial Injection MIT Req'd? Yes ❑ No ❑ Spacing Exception Required? Yes ❑ No ( Subsequent Form Required: P:' •-`/(5 ',It APPROVED BY Approved by: COMMISSIONER THE COMMISSION�2Date: /Z_ 36_ /S �.L'� 'i YIW 14l2.,?)i Submit Form and Form 10-40 evised 11/2 15 O \fePIcNnAi1id for 12 months from the date of approva3 RETOMSWftitcaY7015 • • Well Prognosis Well: MPU F-45 llilcora Alaska,LU Date: 12/23/2015 Well Name: MPU F-45 V" API Number: 50-029-21999-00 Current Status: Oil Well [Failed ESP] Pad: L-Pad Estimated Start Date: January 3rd, 2016 Rig: Reg.Approval Req'd? Yes Date Reg.Approval Rec'vd: ( c(S-0 Sg O Regulatory Contact: Tom Fouts Permit to Drill Number: First Call Engineer: Paul Chan (907) 777-8333 (0) (907) -2881 (M) Second Call Engineer: Stan Porhola (907) 777-8412 (0) (907) 331-8228 (M) AFE Number: Current Bottom Hole Pressure: 1,668 psi @ 7,000' TVD (SBHPS 12/23/2015/4.58 ppg EMW) Maximum Expected BHP: 1,668 psi @ 7,000' TVD (No new perfs being added)/ MPSP: 968 psi (0.1 psi/ft gas gradient) _ Brief Well Summary: MPU F-45 was drilled and completed in September 1995 as a Kuparuk River formation producer. The well has had multiple ESPs installed: January 1996 (initial), October 2000, April 2004, and June 2006. The ESP ,z-z,Yvs- has failed. Notes Regarding Wellbore Condition • Casing tested to ',500 ps for 30 minutes down to 14,107' MD on 7/28/1995. Objective: Pull failed ESP, pressure test casing, and run a new ESP. Brief RWO Procedure: 1. MIRU Nordic#3 WO Rig, ancillary equipment and lines to 500 bbl returns tank. 2. Pull BPV. Circulate well clean with 8.5 ppg sea water. 3. Set BPV. ND Tree. NU 11" BOPE. Pull BPV and set TWC. 4. Test BOPE to 250 psi low/3,.000 psi high, annular to 250 psi low/2,500 psi high (hold each ram/valve and test for 5-min). Record accumulator pre-charge pressures and chart tests. a. Perform Test per Nordic 3 BOP Test Procedure. b. Notify AOGCC 24 hrs in advance of BOP test. c. Submit completed 10-424 BOPE test results within 5 days of completed test. d. Confirm test pressures per the Sundry Conditions of approval. e. Test VBR rams and annular with 2-7/8" and 3-1/2" test joint. 5. Contingency: (If the tubing hanger won't pressure test due to eroded and/or corroded BPV profile and BPV cannot be set with tree on.) " '. a. Notify Operations Engineer(Hilcorp), Mr. Guy Schwartz (AOGCC) and Mr.Jim Regg (AOGCC)via email explaining the wellhead situation prior to performing the rolling test. AOGCC may elect to send an inspector to witness. b. With stack out of the test path, test choke manifold per standard procedure • B • • Well Prognosis Well: MPU F-45 Mean)Alaska,LL+ Date: 12J23/2015 c. Conduct a rolling test: Test the rams and annular with the pump continuing to pump, (monitor the surface equipment for leaks to ensure that the fluid is going down-hole and not leaking anywhere at surface.) d. Hold a constant pressure on the equipment and monitor the fluid/pump rate into the well. Record the pumping rate and pressure. e. Once the BOP ram and annular tests are completed,test the remainder of the system following the normal test procedure (floor valves, gas detection, etc.) f. Record and report this test with notes in the remarks column that the tubing hanger/BPV profile/ penetrator wouldn't hold pressure and rolling test was performed on BOP Equipment and list items, pressures and rates. 6. Bleed any pressure off tubing and casing to 500 bbl returns tank. Pull TWC. Kill well w/8.5 ppg seawater as needed. 7. MU landing joint or spear and recover the tubing hanger. Contingency(If a rolling test was conducted): MU new hanger or test plug to the completion tubing. Re-land hanger(or test plug) in tubing head. Test BOPE per standard procedure. 8. POOH and stand back the 2-7/8" tubing. Tubing may be re-used. Lay down failed ESP. a. Replace bad joints of tubing as necessary. b. Look for over-torqued connections from previous Nabors 4ES tubing runs. 9. RIH with scraper assembly to 13,700' MD. Circulate the well clean. If needed, spot sized salt pill to control losses. POOH. (' ,..( 10. PU test packer and RIH to 13,600' MD. Pressure test casing to 2,000 psi for 30 charted minutes. POOH and LD test packer. 11. PU new ESP and RIH on 2-7/8" 8RD EUE L-80 tubing a. Upper GLM @ ± 134' w/valve b. Lower GLM @ ± 13,370' w/valve c. 2-7/8" XN profile @ ± 13,490' MD d. Set base of ESP at± 13,605' MD 12. Land tubing hanger. RILDS. Lay down landing joint. Note PU (Pick Up) and SO (Slack Off) weights on tally. 13. Set BPV. ND BOPE. NU existing 2-9/16" 5,000#tree/adapter flange. Test tubing hanger void to 500 psi low/5,000 psi high. Pull BPV. 14. RU hot oil and freeze protect well to 2100' MD if needed. 15. RD Nordic#3 WO Rig, ancillary equipment and lines to 500 bbl returns tank. 16. Turn well over to production. 17. RU well house and flowlines. Attachments: 1. As-built Schematic 2. Proposed Schematic 3. BOPE Schematic 4. Choke Schematic s • 111 Well Prognosis Well: MPU F-45 Hilcorp Alaska.LLQ Date: 12/23/2015 5. Existing Tree/Wellhead 6. Nordic#3 Flow Diagram 7. Blank RWO Changes Form • . Milne Point Unit Current Schematic Well: MPU F-45 Last Completed: 6/17/2006 tIilcorp Alaska,LLC PTD: 195-058 CASING DETAIL Orig.KBEIev.:48.35'/GLElev.:13.4'(N27E) Size Type Wt/Grade/Conn Drift ID Top Btm RT toTbg.Spool=32.46' (N 27E) 20" Conductor 91.1/NT8OLHE/N/A N/A Surface 113' ,,,, k 9-5/8" Surface 40/L-80/BTC 8.679 Surface 6,678' 20^ ( 0 7" Production 26/L-80/NSCC 6.151 Surface 14,192' i.., TUBING DETAIL 2-7/8" Tubing 6.5/L-80/EUE 8rd 2.347 Surf 13,605' «„ JEWELRY DETAIL No Depth Item fat 1 134' Camco 2-7/8"x 1"Sidepocket KBMM GLM 1# 2 13,367 Camco 2-7/8"x 1"Sidepocket KBMM GLM i, 3 13,486' 2-7/8"XN-Nipple(2.25 No-go ID) 4 13,529' Pump,GPMTAR 1:165 GC 2200/122 GC 2200 5 13,561' Tandem Gas Separator GRSFTXARH6 6 13,566' Tandem Seal Section 7 13,580' Motor,228 KMH,2305 Volt,60 amp,562 Series 8 13,605' PumpMate w/6 Fin Centralizer t PERFORATION DETAIL/Ref Log: 08/19/95 GR/CCL Sands (Top) Btm(MD) Top(TVD) Btm(TVD) FT Date Status 9-5/8"cr' t,4Kup.A Sands 13,781' 13,865' 7,152' 7,220' 84 8/19/1995 Open Or WELL INCLINATION DETAIL KOP @ 1,100' Max Hole Angle=73°from 4500'—11,700' Hole Angle through perf interval=36° STIMULATION SUMMARY 9/23/95—147 M lbs.16/20 Carbolite @ 40bpm— no screen out. 2 r OPEN HOLE/CEMENT DETAIL r 20" 250 sx of Arcticset I(Approx)30"Hole el A t 0 3 1 9-5/8" 1300 sx PF'E',250 sx Class'G',250 sx PF'E'12-1/4"Hole 4 q7" 225 sx Class'G'8-1/2"Hole 4, t« ; 4 TREE&WELLHEAD + I s Tree Cameron 2-9/16"5M 14S11"5M FMC Gen 5,w/7"x 11"Tbg.Hngr.,2-7/8"8rd EUE Wellhead Threads T&B,2-1/2"CIW"H"BPV profile i dill 6 GENERAL WELL INFO 8 i� API:50-029-22556-00-00 'al Drilled and Cased by Nabors 27E -07/28/95 7 ESP Completion Installed by Nabors 4ES 1/19/1996 R '�' RWO ESP by Nabors 4ES 10/13/2000 > E$ RWO ESP by Nabors 4ES 04/11/2004 , 8 4 RWO ESP by Nabors 4ES 06/17/2006 KUP A Sands u TD=14,220'(MD)/TD=7,502'(TVD) PBTD=14,107'(MD)/PBTD=7,414'(1VD) PC 12/21/2015 14 • • Milne Point Unit Well: MPU F-45 Proposed Schematic Last Completed: 6/17/2006 Ililcorp Alaska,LLC PTD: 195-058 CASING DETAIL Orig.KB Elev.:48.35'/GL Elev.:13.4'(N27E) Size Type Wt/Grade/Conn Drift ID Top Btm RT to Tbg.Spool=32.46' (N 27E) 20" Conductor 91.1/NT8OLHE/N/A N/A Surface 113' ' 1 L 9-5/8" Surface 40/L-80/BTC 8.679 Surface 6,678' 2(T 7" Production 26/L-80/NSCC 6.151 Surface 14,192' TUBING DETAIL 1 i 4 4 2-7/8" Tubing 6.5/L-80/EUE 8rd 2.347 Surf ±13,605' JEWELRY DETAIL No Depth Item 1 ±134' Camco 2-7/8"x 1"Sidepocket KBMM GLM 2 ±13,370' Camco 2-7/8"x 1"Sidepocket KBMM GLM t'» 3 ±13,490' 2-7/8"XN-Nipple(2.25 No Go ID) 4 ±13,530' Pump IS 5 ±13,560' Tandem Gas Separator ' 6 ±13,570' Tandem Seal Section 7 ±13,580' Motor,228 KMH,2305 Volt,60 amp,562 Series 8 ±13,605' PumpMate w/6 Fin Centralizer 9 0 V 7+' PERFORATION DETAIL/Ref Log: 08/19/95 GR/CCL rt Sands (MD) Btm(MD) Top(TVD) Btm(TVD) FT Date Status 9-5/8 ( Kup.A Sands 13,781' 13,865' 7,152' 7,220' 84 8/19/1995 Open WELL INCLINATION DETAIL KOP @ 1,100' Max Hole Angle=73°from 4500'—11,700' Hole Angle through perf interval=36° STIMULATION SUMMARY 9/23/95—147 M lbs.16/20 Carbolite @ 40bpm— no screen out. 2 OPEN HOLE/CEMENT DETAIL 20" 250 sx of Arcticset I(Approx)30"Hole 1 Cr) 3 9-5/8" 1300 sx PF'E',250 sx Class'G',250 sx PF'E'12-1/4"Hole al A 7" 225 sx Class'G'8-1/2"Hole ka4 ,°4 TREE&WELLHEAD " s+5 Tree Cameron 2-9/16"5M MI r Wellhead 11"SM FMC Gen 5,w/7"x 11"Tbg.Hngr.,2-7/8"8 rd EUE Threads T&B,2-1/2"CIW"H"BPV profile 6 GENERAL WELL INFO P API:50-029-22556-00-00 1 :°' Drilled and Cased by Nabors 27E -07/28/95 0 1 ,7 ESP Completion Installed by Nabors 4ES 1/19/1996 RWO ESP by Nabors 4ES 10/13/2000 RWO ESP by Nabors 4ES 04/11/2004 8 1 RWO ESP by Nabors 4ES 06/17/2006 ae ,,,,! li }INP A Sands e TD=14,220'(MD)/TD=7,502'(TVD) PBTD=14,107'(MD)/PBTD=7,414'(11/D) PC 12/21/2015 • • Milne Point •Iii Nordic#3 BOP r ti VO O � , Hydril 11" 5M iii til II tit ' 11 cm 114W Shaffer — etPipe or VBR Rams ® — c—, 11" 5M j--_* Blinds 3 1/8 5M Kill Valves \ i 3 1/8 5M Choke Valves Manual and HCR Manual and HCR , 1. -04 - 1 c Hydril 1 — 11" 5M 1_i• Pipe Rams 3:41 ( * • Airta ,,,,...,,,„.„..,.,..; qo- LL,....„ _ C) . ....•'., . .,.'''"A..",..„..„.„ OA U k Iy w #M. q4h +aYF m A h w♦v F,f, a r yR : " p k. =AAA OF L 0 • N • • v": • I A • kY y ry n x n _ w n IG12IC1 v v v a v v v v v 4 M Y ' IG1,IWI hicilig . , .. . „ „,, , ,. ,. . e k eee eee r%1' I ...,.,,,,,...„, ,,,, J., , , .,..... . ...„ _ .. . ..„ O .....,, .. .. v 1 I a1 m AF . . .. .., „ , ,, , A., A h' ,,, ,. 415 I ,, . St A Yi A i „,„,..00. elej,,,, . , . _ ,. ,, , „ r 0 ik• . ,., : ,,,,,,..,„„„„,. 0 .. . " . , „ , „...„ „ ... . ..... ... . ....... „:„... ',..,:,..i.-,;4:4;:,..4i,,,,,,4:: ;.., Ie� :: .„ s.„,„..,,,,,,. ,..v.,,,,,,,,,,...,...„....,,,,,•: :. •. , . ....... . . , „ ,,.. .. „ ,, „ ,,, ,, F i F �A k# k :. ' ! k•l: It r4,711:. M+ `. �,'E"S'3i.• . , _to, .1 ¢..1',7"it.. IIi. I LLT. ........ -MS A, V^V'Y'V'Y'Y'y' '.' , ,,,,. : i :711:, ,.. :,:,:I:r:1:1: Oft?!. a x x •n III r ,...,.v...,.','',.....,... ,� 1 1 "#� Y M A.,.. T 'l�Yxh � ICI , ik , .M”m„ w g e L v L+ v11,1-111 ICI IGIx Y'1®I IGI 10_1 '19' v v — INI INI X,t/i ICI • 'A .n ` A9 F � ��� M1� � v v v v v • v v v v v v v v v v v v v v v v v v v v v v v v v v � *�� n �ry zxw€ r r*`v 8,, :.„.:„,,,..,..,....,,..,., ; « + '° ssr'-a'-«'�> rl .�n �S-v ,�„ :� e�� sN n r ,,, + , • " , n Yf V n n n re r p x x Y f n n x w F __..4_,r r v a .. `rAr u uv 4n r S • MPU F-45 EXISTING TREE/WELLHEAD Wellhead/Tree Milne Point Unit Iiileorp Alaska.LIA, II Tree Cap Fit( 0p, Tree Valve 2-9/16" 5M 0 -0-"C) ? a., s. 0 Tree Cross 2-9/16" 5M 0(0)0 Tree Valve 2-9/16" 5M u SSV 2-9/16" 5M O fimma L.Q. Tree Valve 2-9/16" 5M Fii A 0,�p. 0' s, ... .1111/1M ESP Cable IS, "' Control Line Tubing Adapter a i� (' ......„,,,- it 1 .,„._. Tubing Head Ill III 11" 5M Top x 11" 5M Btm FiricattN sekitl - - in _ i III MI r. .Ililk l ' Y Casing Head / 11" 5M Top x 11" 5M Btm ®1i� °°�'� ]�' ■i-i•, r y: I-.r • • t X • o coz i- 7 12 au 1 ►♦, -, 0 m 0 to --': ; • . ..._ , ' '0PZ I- m i i. _ • ' I U ♦ O O x ►•1 a_1# t- wa w 0 ♦ w ►V� 1Q a s _ a N :'►�4: : 0,1 : o p o,,,+i.,' p - >W p : h 3 3z Ft 2 2 Z w4 1:4 Lr,p g * a w o i a a U d-- . ?h IIY ` mV E � U I i', • I OW 9U I IY I CY O , A al i to.2 i �i I ' am ; ,w. f E H 1 E _ S ♦ U 2 ,0r _ O � LL . 1 • ' itil- .4 :it: 'i' g • o O U u ' U Z O = U `f f r M f 12 M • - cii � :, i ;' E 0. �- .` O ■ C 3 .. E C • . < _��� = ;O U 2 E ~ A U O • 0 - N U U 0.OY , j-- ., c r .. Igni NO III g U fOO O _I ry� "W.O F 0 • 2 ca k o % CtS 2 £ 2/ J CO (60 w c 0 p 0 o u) e = 0� .Eo < O.ti E £ G 0 . -aa a % ltd / 2 10.- ffC. .- 03 \ / 00 22 02 , af \/ 10� CD e CO .(1) 2 a 0 a co coCCI CI a) a) Co k � _ L.ig / % a w _ - uf k § / C 0_J 2 0 0 \ k -a0 -a 30 ° L k Ef 2 2 k c § a. 0 v / ' / / a) 4 § g U) 2 »% 2 § Cl) o = ( « © c g c w 2 § \ w k 0 � � O \ 0I•4 rs < / ' 2 O ■ Cd Q. Cs1 0RS ci E 0 a CrQ E 0 2a i- co E o x ( » 0 4ct '44 S § x 0 / e 7 2 o $ / co a 2 E q c \ 2 / > k 2 2 \0 0. 2 f 0 o 2 2 \CO < I XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. i C:~'~ -O,~ File Number of Well History File PAGES TO' DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other Scanned by: Beverly ~incent Nathan Lowell Date: [] TO RE-SCAN Notes: Re-Scanned by: Beverly Dianna Vincent Nathan Lowell Date: Is~ gyro/data Gyrodata Incorporated 23000 Northwest Lake Dr. Houston, TX 77095 (281) 213 -6300 Fax:(281)213 -6301 SCOE vy. May 20, 2013 State of Alaska - AOGCC Attn: Christine Shartzer 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 g, o Re: Drill Site: MPF, Well #MPF -45 Ir� Prudhoe Bay, Alaska Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, Rob Shoup Vice President, Special Projects RS:kr Serving the Worldwide Energy Industry with Precision Survey Instrumentation • gyro/data V Gyrodata Incorporated 23000 Northwest Lake Dr. Houston, TX 77095 (281) 213 -6300 Fax: (281) 213 -6301 SURVEY REPORT BP Exploration Drill Site: MPF, Well: MPF -45 Schlumberger Truck & Crane Prudhoe Bay, AK AK0413GCM127 09 April 2013 Serving the Worldwide Energy Industry with Precision Survey Instrumentation 9 r 0 . 0 a � J A Gyrodata Directional Survey for BP EXPLORATION ALASKA INC • Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 Azimuth Correction: Gyro: Bearings are Relative to True North Run Date: 09 Apr 2013 Report Generated: 15 May 2013 03:46 Depth Reference: Rotary Table Surveyor: Edwin Hardon Air Gap (RKB to Ground / RKB to MSL): 48.35 Calculation Method: MINIMUM CURVATURE Vertical Section Calculated from Well Head Location Survey surface coordinates obtained from: Drilling Engineer • Survey Latitude: 70.507716 deg. N Longitude: 149.656729 deg. W Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Well Head Location A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED IN C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.00 N 0.00 E 0 - 13517.9 FT. RATE GYROSCOPIC MULTISHOT SURVEY RUN INSIDE 2.875" TUBING ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO ORIGINAL RKB OF 48.35 FT ORIGINAL RKB 48.35' REFERENCE DEPTH 12.96' REFERENCE POINT TO SWAB 8.5' BOTTOP OF THE TOOL TO SENSOR 3.5' ZEROED ON THE SWAB AT 23.39' 100.00 0.33 17.65 0.33 100.00 0.3 17.6 0.27 N 0.09 E 200.00 0.09 6.71 0.24 200.00 0.6 16.4 0.62 N 0.18 E 300.00 0.17 303.81 0.15 300.00 0.8 4.8 0.77 N 0.07 E 400.00 0.12 241.74 0.16 400.00 0.8 349.6 0.81 N 0.15W 500.00 0.45 200.30 0.37 500.00 0.5 316.8 0.40 N 0.37W 600.00 0.42 209.52 0.07 599.99 0.7 247.4 0.29 S 0.69 W • 700.00 0.79 205.51 0.37 699.99 1.7 223.6 1.22 S 1.16W 800.00 0.81 208.80 0.05 799.98 3.1 216.2 2.47 S 1.80 W 900.00 0.84 210.28 0.04 899.97 4.5 214.0 3.72 S 2.51W 1000.00 0.75 291.90 1.04 999.96 5.4 220.4 4.11 S 3.49 W 1100.00 1.19 334.35 0.82 1099.95 5.4 237.3 2.92 S 4.55W 1200.00 2.27 341.10 1.09 1199.90 5.6 268.9 0.11 S 5.65W 1300.00 3.68 345.77 1.43 1299.76 8.6 304.5 4.87 N 7.08W 1400.00 5.41 352.24 1.80 1399.45 15.2 326.1 12.65 N 8.50W 1500.00 7.32 346.64 2.00 1498.83 25.8 335.7 23.52 N 10.61W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 1600.00 8.30 345.91 0.99 1597.90 39.2 339.4 36.72 N 13.84W 1700.00 9.79 343.45 1.53 1696.65 54.9 340.8 51.88 N 18.02W 1750.00 10.13 343.69 0.68 1745.90 63.6 341.2 60.17 N 20.47W 1775.00 10.13 343.27 0.29 1770.51 68.0 341.4 64.39 N 21.72W 1800.00 10.24 342.48 0.72 1795.11 72.4 341.5 68.61 N 23.02W 1825.00 10.21 342.51 0.14 1819.72 76.8 341.5 72.85 N 24.35 W 1850.00 10.22 343.24 0.52 1844.32 81.2 341.6 77.08 N 25.66 W 1875.00 10.31 342.66 0.56 1868.92 85.7 341.7 81.34 N 26.96W 1900.00 10.41 341.92 0.66 1893.51 90.2 341.7 85.62 N 28.33 W 1925.00 10.46 342.03 0.22 1918.10 94.7 341.7 89.93 N 29.73 W 1950.00 10.52 342.27 0.30 1942.68 99.3 341.7 94.26 N 31.13W 1975.00 10.66 341.97 0.60 1967.26 103.9 341.7 98.63 N 32.54 W 2000.00 11.07 342.37 1.67 1991.81 108.6 341.8 103.12 N 33.98 W • 2025.00 11.47 343.21 1.73 2016.33 113.5 341.8 107.79 N 35.42W 2050.00 11.89 343.21 1.67 2040.81 118.5 341.9 112.63 N 36.89W 2075.00 12.22 343.50 1.35 2065.26 123.7 341.9 117.64 N 38.38W 2100.00 12.78 343.96 2.28 2089.66 129.1 342.0 122.83 N 39.90W 2125.00 13.58 343.58 3.21 2114.00 134.8 342.1 128.30 N 41.49W 2150.00 14.66 345.14 4.56 2138.25 140.9 342.2 134.18 N 43.13W 2175.00 15.50 345.62 3.40 2162.39 147.4 342.3 140.47 N 44.77W 2200.00 16.24 345.88 3.01 2186.44 154.3 342.5 147.09 N 46.46W 2225.00 17.16 346.78 3.82 2210.38 161.4 342.6 154.08 N 48.15W . _ A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 2250.00 18.25 346.90 4.35 2234.20 169.0 342.8 161.48 N 49.88W 2275.00 19.00 347.12 101 2257.89 177.0 343.0 169.26 N 51.68W 2300.00 19.68 347.01 2.71 2281.48 185.2 343.2 177.33 N 53.53 W 2325.00 20.26 346.81 2.34 2304.97 193.8 343.4 185.64 N 55.46W 2350.00 20.92 347.23 2.70 2328.38 202.5 343.5 194.21 N 57.44 W 2375.00 21.94 347.41 4.10 2351.65 211.6 343.7 203.12 N 59.44W 2400.00 22.87 347.10 3.75 2374.76 221.2 343.8 212.41 N 61.54W 2425.00 23.65 346.85 3.16 2397.73 231.0 344.0 222.03 N 63.77W 2450.00 24.45 346.55 3.21 2420.56 241.2 344.1 231.95 N 66.12W 2475.00 25.16 346.50 2.85 2443.25 251.7 344.2 242.15 N 68.56W 2500.00 26.18 346.19 4.10 2465.78 262.5 344.3 252.67 N 71.12W 2525.00 26.87 345.91 2.81 2488.15 273.6 344.4 263.50 N 73.81W • 2550.00 27.48 345.61 2.49 2510.39 285.1 344.4 274.57 N 76.62W 2575.00 28.31 345.26 3.40 2532.49 296.8 344.4 285.89 N 79.56 W 2600.00 29.02 345.07 2.86 2554.42 308.7 344.5 297.48 N 82.63W 2625.00 29.97 345.18 3.81 2576.18 321.1 344.5 309.38 N 85.79 W 2650.00 30.71 345.39 3.01 2597.76 333.7 344.5 321.59 N 89.00W 2675.00 31.29 345.57 2.31 2619.19 346.6 344.6 334.06 N 92.22W 2700.00 31.90 345.81 2.50 2640.48 359.6 344.6 346.75 N 95.46W 2725.00 32.51 346.27 2.65 2661.64 373.0 344.7 359.68 N 98.67 W 2750.00 33.33 346.86 3.52 2682.62 386.5 344.7 372.89 N 101.83W 2775.00 33.89 347.03 2.27 2703.44 400.4 344.8 386.38 N 104.96W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413 GCM 127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. III 2800.00 34.50 347.02 2.43 2724.12 414.4 344.9 400.07 N 108.11W 2825.00 35.11 347.14 2.48 2744.65 428.7 345.0 413.98 N 111.30W 2850.00 35.97 347.04 3.45 2764.99 443.2 345.0 428.14 N 114.55W 2875.00 36.86 346.72 3.62 2785.11 458.0 345.1 442.60 N 117.92W 2900.00 37.80 346.70 3.77 2804.98 473.2 345.1 457.35 N 121.41W 2925.00 38.40 346.61 2.40 2824.66 488.6 345.2 472.36 N 124.97W 2950.00 39.38 346.55 3.91 2844.12 504.3 345.2 487.63 N 128.61W 2975.00 40.22 346.44 3.39 2863.32 520.3 345.3 503.19 N 132.34W 3000.00 41.18 346.27 3.86 2882.28 536.6 345.3 519.03 N 136.19W 3025.00 42.18 346.03 4.04 2900.95 553.2 345.3 535.17 N 140.17W 3050.00 42.73 345.96 2.21 2919.39 570.1 345.3 551.54 N 144.25 W 3075.00 43.27 345.93 2.18 2937.68 587.1 345.4 568.08 N 148.39W • 3100.00 3J25.00 44.06 345.65 3.23 2955.76 604.4 345.4 584.81 N 152.63W 44.88 345.70 3.29 2973.60 621.9 345.4 601.78 N 156.96W 3150.00 45.84 345.75 3.85 2991.17 639.7 345.4 619.02 N 161.35W 3175.00 46.41 345.77 2.27 3008.50 657.7 345.4 636.49 N 165.78W 3200.00 46.85 345.85 1.79 3025.67 675.9 345.4 654.11 N 170.24W 3225.00 47.26 345.87 1.64 3042.70 694.2 345.4 671.85 N 174.71W 3250.00 47.59 345.92 1.33 3059.61 712.6 345.4 689.71 N 179.19W 3275.00 47.87 346.10 1.24 3076.43 731.1 345.5 707.66 N 183.67W 3300.00 48.22 346.21 1.44 3093.14 749.7 345.5 725.71 N 188.12W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. S 3325.00 48.61 346.25 1.57 3109.73 768.4 345.5 743.87 N 192.57W 3350.00 49.12 346.29 2.04 3126.18 787.2 345.5 762.16 N 197.04W 3375.00 49.52 346.29 1.60 3142.47 806.2 345.5 780.58 N 201.53W 3400.00 49.85 346.19 1.36 3158.65 825.2 345.5 799.10 N 206.06W 3425.00 50.24 346.10 1.58 3174.70 844.4 345.6 817.71 N 210.65W 3450.00 50.65 346.14 1.63 3190.62 863.7 345.6 836.42 N 215.28W 3475.00 51.66 345.54 4.46 3206.30 883.1 345.6 855.30 N 220.04W 3500.00 52.40 345.49 2.96 3221.68 902.9 345.6 874.38 N 224.97W 3525.00 53.09 345.13 2.98 3236.81 922.8 345.6 893.63 N 230.02W 3550.00 53.62 344.76 2.43 3251.74 942.8 345.6 913.00 N 235.23W 3575.00 54.18 344.59 2.29 3266.47 963.0 345.5 932.48 N 240.57W 3600.00 54.91 342.90 6.22 3280.97 983.4 345.5 952.02 N 246.27W 3625.00 55.50 342.53 2.67 3295.24 1003.9 345.4 971.63 N 252.37W • 3650.00 56.34 342.14 3.59 3309.25 1024.5 345.4 991.36 N 258.65 W 3675.00 56.94 341.72 2.77 3322.99 1045.4 345.3 1011.21 N 265.13 W 3700.00 57.75 341.78 3.26 3336.48 1066.4 345.2 1031.20 N 271.72W 3725.00 59.02 341.85 5.09 3349.59 1087.6 345.2 1051.42 N 278.36W 3750.00 59.81 342.17 3.35 3362.31 1109.1 345.1 1071.89 N 285.01 W 3775.00 60.19 342.27 1.56 3374.81 1130.8 345.1 1092.51 N 291.62W 3800.00 60.64 342.44 1.87 3387.15 1152.5 345.0 1113.23 N 298.21 W 3825.00 61.11 342.57 1.94 3399.32 1174.3 345.0 1134.06 N 304.78 W 3850.00 61.69 342.84 2.51 3411.29 1196.2 344.9 1155.01 N 311.30W A Gyrodata Directional Survey BP EXPLORATION ALASKA. INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 3875.00 62.11 342.94 1.72 3423.06 1218.3 344.9 1176.09 N 317.79W 3900.00 62.57 343.01 1.86 3434.67 1240.4 344.8 1197.26 N 324.28 W 3925.00 62.97 343.00 1.60 3446.11 1262.6 344.8 1218.52 N 330.77W 3950.00 63.40 342.97 1.73 3457.38 1284.9 344.8 1239.86 N 337.30W 3975.00 63.56 343.04 0.68 3468.55 1307.3 344.8 1261.25 N 343.84W 4000.00 63.96 343.06 1.58 3479.60 1329.7 344.7 1282.70 N 350.38 W 4025.00 64.46 342.98 2.02 3490.48 1352.2 344.7 1304.23 N 356.95W 4050.00 65.02 343.04 2.27 3501.15 1374.8 344.7 1325.85 N 363.56W 4075.00 65.50 343.02 1.90 3511.61 1397.5 344.6 1347.57 N 370,19W 4100.00 66.27 342.92 3.12 3521.82 1420.3 344.6 1369.38 N 376.87W 4125.00 66.65 342.92 1.52 3531.81 1443.2 344.6 1391.29 N 383.60W 4150.00 66.91 342.69 1.35 3541.67 1466.2 344.6 1413.24 N 390.39 W • 4175.00 67.07 342,53 0.88 3551.44 1489.2 344.5 1435.20 N 397.27W 4200.00 67.05 342.51 0.10 3561.18 1512.2 344.5 1457.16 N 404.19W 4225.00 66.77 342.29 1.41 3570.98 1535.2 344.5 1479.08 N 411.14W 4250.00 66.69 342.28 0.30 3580.86 1558.1 344.4 1500.96 N 418.13W 4275.00 66.78 342.21 0.43 3590.73 1581.1 344.4 1522.83 N 425.14W 4300.00 66.65 342.18 0.56 3600.62 1604.0 344.4 1544.69 N 432.16W 4325.00 66.67 342.28 0.36 3610.52 1626.9 344.3 1566.55 N 439.16W 4350.00 67.18 342.23 2.05 3620.32 1649.9 344.3 1588.46 N 446.17W 4375.00 67.70 342.26 2.11 3629.91 1673.0 344.3 1610.44 N 453.21 W 4400.00 68.28 342.26 2.29 3639.28 1696.2 344.3 1632.52 N 460.27W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 4425.00 68.79 342.35 2.06 3648.43 1719.4 344.2 1654.69 N 467.35 W 4450.00 69.29 342.44 2.03 3657.37 1742.8 344.2 1676.94 N 474.41 W 4475.00 69.82 342.53 2.15 3666.11 1766.2 344.2 1699.28 N 481.46W 4500.00 70.09 342.58 1.11 3674.68 1789.6 344.2 1721.68 N 488.50 W 4525.00 70.27 342.57 0.71 3683.15 1813.2 344.1 1744.12 N 495.54 W 4550.00 70.24 342.67 0.40 3691.60 1836.7 344.1 1766.58 N 502.57 W 4575.00 69.92 342.58 1.32 3700.12 1 860.2 344.1 1789.01 N 509.59 W 4600.00 69.88 342.56 0.17 3708.71 1883.6 344.1 1811.41 N 516.62W 4625.00 70.24 342.81 1.72 3717.23 1907.1 344.1 1833.84 N 523.61 W 4650.00 70.67 343.16 2.16 3725.60 1930.7 344.1 1856.37 N 530.51W 4675.00 71.05 343.88 3.11 3733.80 1954.3 344.0 1879.02 N 537.20W 4700.00 71.33 344.04 1.30 3741.86 1978.0 344.0 1901.76 N 543.74 W • 4725.00 71.09 344.13 1.05 3749.91 2001.6 344.0 1924.52 N 550.23 W 4750.00 71.01 344.27 0.62 3758.03 2025.3 344.0 1947.27 N 556.67W 4775.00 70.70 344.16 1.29 3766.23 2048.9 344.0 1970.00 N 563.10W 4800.00 70.64 344.03 0.53 3774.51 2072.5 344.0 1992.69 N 569.56W 4825.00 70.39 343.85 1.21 3782.84 2096.1 344.0 2015.34 N 576.08 W 4850.00 70.09 343.64 1.46 3791.29 2119.6 344.0 2037.93 N 582.67W 4875.00 70.09 343.67 0.13 3799.81 2143.1 344.0 2060.48 N 589.28 W 4900.00 69.92 343.66 0.66 3808.36 2166.6 344.0 2083.03 N 595.89 W 4925.00 69.67 343.93 1.45 3816.99 2190.0 344.0 2105.56 N 602.44 W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 4950.00 69.60 344.33 1.53 3825.69 2213.5 344.0 2128.10 N 608.85W 4975.00 69.47 344.86 2.05 3834.43 2236.9 344.0 2150.68 N 615.07W 5000.00 69.61 345.22 1.45 3843.17 2260.3 344.1 2173.31 N 621.12W 5025.00 69.67 345.24 0.27 3851.87 2283.8 344.1 2195.97 N 627.09 W 5050.00 70.07 345.43 1.72 3860.47 2307.2 344.1 2218.68 N 633.03 W 5075.00 70.39 345.61 1.46 3868.93 2330.7 344.1 2241.46 N 638.92 W 5100.00 71.30 345.64 3.65 3877.13 2354.3 344.1 2264.34 N 644.78 W 5125.00 71.81 345.65 2.03 3885.04 2378.1 344.1 2287.31 N 650.66 W 5150.00 72.03 345.96 1.48 3892.80 2401.8 344.1 2310.35 N 656.49 W 5175.00 72.32 345.95 1.16 3900.45 2425.6 344.2 2333.44 N 662.26W 5200.00 72.28 346.08 0.52 3908.05 2449.4 344.2 2356.55 N 668.02W 5225.00 72.12 346.16 0.71 3915.69 2473.2 344.2 2379.66 N 673.73 W 5250.00 72.33 346.29 0.97 3923.33 2497.0 344.2 2402.78 N 679.40W • 5275.00 72.23 346.28 0.39 3930.94 2520.8 344.2 2425.91 N 685.04 W 5300.00 72.02 346.48 1.13 3938.61 2544.6 344.3 2449.04 N 690.65W 5325.00 71.91 346.49 0.45 3946.35 2568.3 344.3 2472.15 N 696.20 W 5350.00 71.87 346.73 0.94 3954.12 2592.1 344.3 2495.27 N 701.70W 5375.00 72.15 346.88 1.25 3961.84 2615.8 344.3 2518.42 N 707.13 W 5400.00 72.04 346.88 0.43 3969.53 2639.6 344.3 2541.59 N 712.53W 5425.00 71.71 346.85 1.31 3977.30 2663.3 344.4 2564.72 N 717.93W 5450.00 71.55 346.66 0.95 3985.18 2687.0 344.4 2587.82 N 723.37W 5475.00 71.47 346.81 0.66 3993.11 2710.7 344.4 2610.90 N 728.81 W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. III 5500.00 71.64 346.91 0.75 4001.02 2734.4 344.4 2633.99 N 734.20 W 5525.00 71.36 346.78 1.19 4008.95 2758.1 344.4 2657.08 N 739.60 W 5550.00 71.05 346.79 1.26 4017.00 2781.7 344.5 2680.12 N 745.01 W 5575.00 70.84 346.67 0.97 4025.17 2805.3 344.5 2703.12 N 750.43 W 5600.00 70.56 346.77 1.16 4033.43 2828.9 344.5 2726.08 N 755.85 W 5625.00 70.44 346.68 0.58 4041.78 2852.5 344.5 2749.02 N 761.26W 5650.00 69.93 346.54 2.11 4050.25 2876.0 344.5 2771.90 N 766.71 W 5675.00 69.78 346.39 0.82 4058.86 2899.4 344.6 2794.72 N 772.20W 5700.00 69.94 346.41 0.64 4067.47 2922.9 344.6 2817.53 N 777.72 W 5725.00 70.10 346.40 0.66 4076.01 2946.4 344.6 2840.37 N 783.24W 5750.00 70.36 346.35 1.03 4084.47 2969.9 344.6 2863.23 N 788.78 W 5775.00 70.62 346.46 1.12 4092.82 2993.4 344.6 2886.13 N 794.32W 410 5800.00 71.22 346.58 2.44 4100.99 3017.1 344.6 2909.11 N 799.83 W 5825.00 71.64 346.62 1.69 4108.95 3040.7 344.6 2932.16 N 805.32 W 5850.00 71.92 346.67 1.14 4116.77 3064.5 344.7 2955.27 N 810.81W 5875.00 71.99 346.53 0.60 4124.51 3088.2 344.7 2978.39 N 816.32W 5900.00 71.92 346.46 0.38 4132.26 3112.0 344.7 3001.50 N 821.87W 5925.00 71.83 346.35 0.55 4140.03 3135.7 344.7 3024.60 N 827.45 W 5950.00 71.75 346.34 0.34 4147.85 3159.5 344.7 3047.67 N 833.06 W 5975.00 71.68 346.34 0.26 4155.69 3183.2 344.7 3070.74 N 838.66W 6000.00 71.73 346.28 0.29 4163.54 3206.9 344.7 3093.80 N 844.28 W 6025.00 71.56 346.24 0.72 4171.41 3230.7 344.7 3116.85 N 849.92W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413 GCM 127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. III 6050.00 71.30 346.22 1.04 4179.37 3254.3 344.8 3139.87 N 855.56W 6075.00 71.29 346.25 0.09 4187.39 3278.0 344.8 3162.87 N 861.19W 6100.00 71.22 346.22 0.30 4195.43 3301.7 344.8 3185.86 N 866.83W 6125.00 70.97 346.09 1.10 4203.52 3325.3 344.8 3208.83 N 872.49 W 6150.00 71.11 346.15 0.60 4211.65 3349.0 344.8 3231.78 N 878.16W 6175.00 71.33 346.11 0.90 4219.69 3372.6 344.8 3254.76 N 883.83W 6200.00 71.70 346.03 1.47 4227.62 3396.3 344.8 3277.77 N 889.54 W 6225.00 72.01 345.93 1.31 4235.41 3420.1 344.8 3300.82 N 895.30 W 6250.00 71.98 345.85 0.31 4243.13 3443.9 344.8 3323.88 N 901.09 W 6275.00 71.97 345.97 0.46 4250.87 3467.6 344.8 3346.94 N 906.88 W 6300.00 71.28 345.85 2.81 4258.75 3491.3 344.8 3369.95 N 912.65W 6325.00 71.27 345.93 0.30 4266.77 3515.0 344.9 3392.91 N 918.42W 6350.00 71.43 345.87 0.70 4274.77 3538.7 344.9 3415.89 N 924.19W 6375.00 71.34 345.73 0.66 4282.75 3562.4 344.9 3438.85 N 930.01 W 6400.00 71.27 345.81 0.42 4290.76 3586.1 344.9 3461.81 N 935.83 W 6425.00 71.23 345.78 0.20 4298.80 3609.7 344.9 3484.76 N 941.64W 6450.00 71.65 345.97 1.82 4306.76 3633.4 344.9 3507.74 N 947.42W 6475.00 72.18 346.02 2.14 4314.52 3657.2 344.9 3530.80 N 953.17W 6500.00 72.56 346.28 1.81 4322.09 3681.0 344.9 3553.93 N 958.87W 6525.00 72.49 346.43 0.64 4329.60 3704.9 344.9 3577.10 N 964.50 W 6550.00 72.08 346.36 1.66 4337.20 3728.7 344.9 3600.25 N 970.10W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 6575.00 72.27 346.28 0.80 4344.86 3752.5 344.9 3623.38 N 975.73 W 6600.00 72.50 346.16 1.05 4352.42 3776.3 344.9 3646.52 N 981.40W 6625.00 72.25 346.00 1.19 4359.99 3800.1 344.9 3669.64 N 987.14W 6650.00 72.29 346.04 0.24 4367.61 3823.9 345.0 3692.75 N 992.89 W 6675.00 71.56 345.87 2.99 4375.36 3847.7 345.0 3715.81 N 998.66W 6700.00 71.03 345.91 2.12 4383.38 3871.3 345.0 3738.77 N 1004.43 W 6725.00 71.58 345.77 2.24 4391.39 3895.0 345.0 3761.73 N 1010.22W 6750.00 71.82 345.59 1.19 4399.24 3918.8 345.0 3784.73 N 1016.09W 6775.00 72.21 345.38 1.76 4406.96 3942.5 345.0 3807.75 N 1022.05W 6800.00 71.62 345.05 2.70 4414.72 3966.3 345.0 3830.73 N 1028.12W 6825.00 71.61 344.76 1.09 4422.61 3990.0 345.0 3853.64 N 1034.29W 6850.00 71.90 344.56 1.36 4430.43 4013.8 345.0 3876.53 N 1040.57W 6875.00 71.64 344.15 1.89 4438.25 4037.5 345.0 3899.40 N 1046.98W III 6900.00 71.73 344.10 0.43 4446.11 4061.2 345.0 3922.23 N 1053.47W 6925.00 71.61 343.71 1.55 4453.97 4085.0 345.0 3945.03 N 1060.05W 6950.00 71.73 343.46 1.07 4461.83 4108.7 345.0 3967.79 N 1066.76W 6975.00 71.71 343.35 0.41 4469.67 4132.4 344.9 3990.54 N 1073.54W 7000.00 71.21 342.88 2.69 4477.62 4156.1 344.9 4013.22 N 1080.42W 7025.00 70.96 342.57 1.54 4485.72 4179.7 344.9 4035.81 N 1087.45W 7050.00 70.87 342.47 0.52 4493.90 4203.4 344.9 4058.34 N 1094.54W 7075.00 71.02 342.35 0.74 4502.06 4227.0 344.9 4080.87 N 1101.68W 7100.00 71.20 342.35 0.71 4510.15 4250.6 344.9 4103.41 N 1108.86W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 7125.00 71.82 343.05 3.64 4518.08 4274.3 344.9 4126.04 N 1115.91W 7150.00 72.34 343.07 2.08 4525.77 4298.1 344.9 4148.80 N 1122.84W 7175.00 72.20 343.19 0.72 4533.39 4321.9 344.8 4171.59 N 1129.75W 7200.00 72.37 343.31 0.82 4541.00 4345.7 344.8 4194.39 N 1136.61W 7225.00 72.21 343.01 1.30 4548.60 4369.5 344.8 4217.18 N 1143.51W 7250.00 72.25 342.85 0.61 4556.23 4393.3 344.8 4239.94 N 1150.50W 7275.00 72.23 343.01 0.59 4563.85 4417.1 344.8 4262.70 N 1157.49W 7300.00 72.41 343.03 0.73 4571.45 4440.9 344.8 4285.48 N 1164.44W 7325.00 72.54 342.80 1.03 4578.98 4464.7 344.8 4308.27 N 1171.45W 7350.00 72.53 342.78 0.09 4586.48 4488.5 344.8 4331.05 N 1178.51W 7375.00 72.18 342.95 1.54 4594.06 4512.3 344.8 4353.82 N 1185.53W 7400.00 71.87 343.40 2.11 4601.77 4536.1 344.8 4376.58 N 1192.41W • 7425.00 7450.00 71.51 343.77 2.00 4609.63 4559.8 344.8 4399.34 N 1199.12W 71.18 344.20 2.12 4617.62 4583.5 344.7 4422.11 N 1205.65W 7475.00 71.16 344.18 0.14 4625.70 4607.2 344.7 4444.88 N 1212.10W 7500.00 70.94 343.89 1.37 4633.81 4630.8 344.7 4467.61 N 1218.61W 7525.00 71.00 343.82 0.36 4641.97 4654.5 344.7 4490.31 N 1225.18W 7550.00 71.08 343.76 0.40 4650.09 4678.1 344.7 4513.01 N 1231.78W 7575.00 71.10 343.51 0.92 4658.19 4701.7 344.7 4535.71 N 1238.44W 7600.00 70.36 343.60 2.97 4666.44 4725.3 344.7 4558.34 N 1245.12W 7625.00 69.90 343.35 2.07 4674.94 4748.8 344.7 4580.88 N 1251.81W 7650.00 70.33 343.34 1.70 4683.44 4772.3 344.7 4603.40 N 1258.55W 1 A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 7675.00 70.82 343.44 2.03 4691.75 4795.9 344.7 4626.00 N 1265.29 W 7700.00 71.30 343.90 2.57 4699.87 4819.6 344.7 4648.69 N 1271.94W 7725.00 71.61 344.13 1.52 4707.82 4843.3 344.7 4671.47 N 1278.46W 7750.00 71.34 344.25 1.16 4715.76 4867.0 344.7 4694.28 N 1284.92W 7775.00 71.32 344.41 0.62 4723.77 4890.6 344.7 4717.09 N 1291.32W 7800.00 71.70 344.39 1.52 4731.69 4914.4 344.7 4739.92 N 1297.70W 7825.00 71.47 344.42 0.93 4739.59 4938.1 344.7 4762.77 N 1304.07 W 7850.00 70.97 344.42 1.99 4747.64 4961.7 344.7 4785.57 N 1310.43W 7875.00 71.02 344.29 0.52 4755.78 4985.4 344.7 4808.33 N 1316.80W 7900.00 71.04 344.45 0.59 4763.91 5009.0 344.7 4831.10 N 1323.17W 7925.00 71.18 344.55 0.70 4772.00 50323 344.7 4853.89 N 1329,50W 7950.00 71.11 344.27 1.10 4780.08 5056.3 344.7 4876.68 N 1335.85W • 7975.00 70.96 344.85 2.26 4788.20 5080.0 344.7 4899.47 N 1342.15W 8000.00 71.07 345.16 1.25 4796.34 5103.6 344.7 4922.30 N 1348.27W 8025.00 71.12 345.13 0.23 4804.44 5127.3 344.7 4945.16 N 1354.33 W 8050.00 71.28 344.99 0.84 4812.49 5150.9 344.7 4968.03 N 1360.43W 8075.00 70.98 344.72 1.57 4820.58 5174.6 344.7 4990.87 N 1366.61W 8100.00 70.66 344.35 1.91 4828.79 5198.2 344.7 5013.62 N 1372.91W 8125.00 70.44 344.03 1.47 4837.12 5221.8 344.7 5036.30 N 1379.33W 8150.00 70.26 343.91 0.87 4845.52 5245.3 344.7 5058.93 N 1385.84W 8175.00 70.27 343.68 0.89 4853.96 5268.8 344.7 5081.53 N 1392.40W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg. feet de t feet deg. deg. deg./ feet feet g 100 ft. • 8200.00 70.14 343.43 1.07 4862.43 5292.4 344.7 5104.09 N 1399.06W 8225.00 69.93 343.28 1.01 4870.96 5315.9 344,7 5126.60 N 1405.79W 8250.00 70.48 343.14 2.28 4879.43 5339.4 344.7 5149.12 N 1412.59W 8275.00 70.90 343.35 1.84 4887.70 5363.0 344.7 5171.72 N 1419.39W 1 8300.00 71.07 343.45 0,77 4895.84 5386.6 344.6 5194.37 N 1426.14W 8325.00 71.34 343.20 1.47 4903.90 5410.2 344.6 5217.04 N 1432.93W 8350.00 71.47 343.37 0.80 4911.87 5433.9 344.6 5239.73 N 1439.75W 8375.00 71.86 343.42 1.59 4919.73 5457.7 344.6 5262.47 N 1446.53 W 8400.00 72.01 343.61 0.94 4927,49 5481.4 344.6 5285.26 N 1453.27W 8425.00 72.12 343.61 0.44 4935.18 5505.2 344.6 5308.08 N 1459.98W 8450.00 72.10 343.50 0.43 4942.86 5529.0 344.6 5330.90 N 1466.72W 8475.00 71.67 343.51 1.72 4950.64 5552.7 344.6 5353.68 N 1473.46W 8500.00 71.55 343.51 0.47 4958.52 5576.5 344.6 5376.43 N 1480.20W • 8525.00 71.78 343.67 1.09 4966.39 5600.2 344.6 5399.20 N 1486.90W 8550.00 72.17 343.84 1.72 4974.12 5624.0 344.6 5422.02 N 1493.55W 8575.00 72.40 344.17 1.55 4981.73 5647.8 344.6 5444.91 N 1500.11W 8600.00 72.32 344.30 0.60 4989.31 5671.6 344.6 5467.84 N 1506.59W 8625.00 72.16 344.09 1.02 4996.93 5695.4 344.6 5490.75 N 1513.07W 8650.00 72.19 343.98 0.43 5004.58 5719.2 344.6 5513.63 N 1519.62W 8675.00 72.02 343.83 0.90 5012.26 5743.0 344.6 5536.49 N 1526.21W 8700.00 71.74 343.71 1.20 5020.04 5766.8 344.6 5559.30 N 1532.85W 8725.00 71.89 343.83 0.78 5027.84 5790.5 344.6 5582.11 N 1539.49W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 8750.00 72.48 344.05 2.50 5035.49 5814.3 344.6 5604.98 N 1546.07W 8775.00 72.94 344.41 2.26 5042.92 5838.2 344.6 5627.95 N 1552.56W 8800.00 72.94 344.43 0.10 5050.25 5862.1 344.6 5650.98 N 1558.98W 1 8825.00 72.87 344.12 1.22 5057.60 5886.0 344.6 5673.98 N 1565.46W 8850.00 72.66 343.93 1.11 5065.01 5909.8 344.6 5696.93 N 1572.03W 8875.00 72.68 343.85 0.28 5072.46 5933.7 344.6 5719.86 N 1578.65W 8900.00 72.91 343.71 1.06 5079.85 5957.6 344.6 5742.79 N 1585.32W 8925.00 72.79 343.54 0.80 5087.22 5981.5 344.6 5765.71 N 1592.06W 8950.00 72.58 342.99 2.27 5094.67 6005.3 344.6 5788.57 N 1598.93W 8975.00 72.02 342.83 2.33 5102.27 6029.1 344.6 5811.33 N 1605.93W 9000.00 71.79 342.73 0.99 5110.03 6052.9 344.5 5834.03 N 1612.96W 9025.00 71.74 342.34 1.49 5117.85 6076.6 344.5 5856.68 N 1620.09W 9050.00 71.24 342.35 2.01 5125.79 6100.3 344.5 5879.27 N 1627.28W 9075.00 71.48 342.55 1.23 5133.78 6124.0 344.5 5901.85 N 1634.42 W 9100.00 71.80 342.58 1.29 5141.66 6147.7 344.5 5924.49 N 1641.53W 9125.00 72.20 342.62 1.61 5149.38 6171.5 344.5 5947.18 N 1648.64W 9150.00 72.54 342.78 1.49 5156.95 6195.3 344.5 5969.93 N 1655.73W 9175.00 72.13 342.83 1.64 5164.54 6219.1 344.5 5992.68 N 1662.77W 9200.00 72.39 342.76 1.07 5172.16 6242.9 344.5 6015.43 N 1669.81W 9225.00 72.54 343.01 1.12 5179.69 6266.7 344.5 6038.21 N 1676.82 W 9250.00 72.59 343.10 0.40 5187.18 6290.6 344.5 6061.03 N 1683.77W 9275.00 72.76 343.09 0.69 5194.63 6314.4 344.5 6083.86 N 1690.71W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 9300.00 72.61 343.39 1.29 5202.07 6338.3 344.5 6106.72 N 1697.59W 9325.00 72.24 343.60 1.69 5209.62 6362.1 344.5 6129.57 N 1704.36W 9350.00 71.94 343.86 1.54 5217.30 6385.9 344.5 6152.40 N 1711.03W 9375.00 71.98 344.06 0.78 5225.05 6409.7 344.5 6175.25 N 1717.59W 9400.00 72.10 344.26 0.88 5232.75 6433.5 344.5 6198.13 N 1724.08W 9425.00 72.33 344.79 2.22 5240.39 6457.3 344.5 6221.07 N 1730.44W 9450.00 71.79 344.68 2.20 5248.09 6481.0 344.5 6244.02 N 1736.70W 9475.00 71.87 345.05 1.47 5255.89 6504.8 344.5 6266.95 N 1742.90W 9500.00 72.17 345.49 2.06 5263.60 6528.6 344.5 6289.94 N 1748.95W 9525.00 72.43 345.90 1.86 5271.20 6552.4 344.5 6313.02 N 1754.83W 9550.00 72.53 346.03 0.64 5278.73 6576.2 344.5 6336.15 N 1760.61W 9575.00 72.90 346.18 1.60 5286.16 6600.1 344.5 6359.32 N 1766.34W • 9600.00 73.30 346.51 2.01 5293.42 6624.0 344.5 6382.57 N 1771.99W 9625.00 73.63 346.67 1.46 5300.54 6647.9 344.5 6405.88 N 1777.55 W 9650.00 73.44 346.65 0.77 5307.62 6671.9 344.5 6429.21 N 1783.08W 9675.00 73.52 346.22 1.68 5314.73 6695.8 344.5 6452.51 N 1788.70W 9700.00 72.99 346.23 2.12 5321.94 6719.8 344.5 6475.76 N 1794.40W 9725.00 73.30 346.13 1.30 5329.18 6743.7 344.5 6498.99 N 1800.12W 9750.00 73.44 345.91 1.01 5336.34 6767.6 344.5 6522.24 N 1805.91W 9775.00 72.90 345.56 2.54 5343.58 6791.6 344.5 6545.43 N 1811.80W 9800.00 73.03 345.19 1.51 5350.90 6815.5 344.5 6568.56 N 1817.84W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 9825.00 72.57 345.00 1.99 5358.29 6839.3 344.5 6591.64 N 1823.98W 9850.00 72.96 344.90 1.61 5365.70 6863.2 344.5 6614.69 N 1830.18W 9875.00 73.08 344.76 0.71 5373.00 6887.1 344.5 6637.77 N 1836.44W 9900.00 72.58 344.57 2.14 5380.38 6911.0 344.5 6660.81 N 1842.75W 9925.00 72.77 344.33 1.20 5387.83 6934.9 344.5 6683.80 N 1849.15W 9950.00 72.11 344.25 2.62 5395.37 6958.7 344.5 6706.74 N 1855.60W 9975.00 72.20 344.08 0.73 5403.03 6982.5 344.5 6729.64 N 1862.10W 10000.00 72.23 343.82 0.98 5410.67 7006.3 344.5 6752.52 N 1868.68W 10025.00 71.87 343.64 1.59 5418.37 7030.1 344.5 6775.35 N 1875.34W 10050.00 72.24 343.60 1.48 5426.07 7053.9 344.5 6798.17 N 1882.05W 10075.00 72.66 344.18 2.78 5433.61 7077.7 344.5 6821.06 N 1888.66W 10100.00 72.83 344.16 0.68 5441.03 7101.6 344.5 6844.03 N 1895.18W 10125.00 73.02 344.05 0.88 5448.37 7125.5 344.5 6867.02 N 1901.72W • 10150.00 73.26 344.46 1.87 5455.62 7149.4 344.5 6890.05 N 1908.21W 10175.00 73.53 344.64 1.28 5462.76 7173.4 344.5 6913.14 N 1914.60W 10200.00 73.49 345.12 1.84 5469.86 7197.3 344.5 6936.28 N 1920.85W 10225.00 73.07 344.94 1.78 5477.05 7221.3 344.5 6959.41 N 1927.03W 10250.00 73.42 345.35 2.10 5484.26 7245.2 344.5 6982.55 N 1933.17W 10275.00 72.87 346.05 3.47 5491.50 7269.1 344.5 7005.73 N 1939.08W 10300.00 73.18 345.87 1.41 5498.80 7293.0 344.5 7028.93 N 1944.88W 10325.00 72.72 345.74 1.88 5506.13 7316.9 344.5 7052.10 N 1950.74W 10350.00 72.88 345.62 0.77 5513.53 7340.8 344.5 7075.24 N 1956.65W Gyrodata Directional Survey A Gy Y BP EXPLORATION ALASKA INC R L SITE: MPF -PAD WELL: MPF-45, 2.875" TUBING Lease: MILNE POINT Well: D I L , Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 10375.00 73.00 345.25 1.51 5520.86 7364.7 344.5 7098.37 N 1962.66W 10400.00 72.70 344.94 1.69 5528.23 7388.6 344.5 7121.46 N 1968.80W 10425.00 72.61 344.57 1.46 5535.69 7412.5 344.5 7144.48 N 1975.08W 10450.00 72.40 344.52 0.87 5543.20 7436.3 344.5 7167.46 N 1981.43W 10475.00 72.57 344.45 0.71 5550.73 7460.1 344.5 7190.43 N 1987.81W 10500.00 72.54 344.30 0.58 5558.23 7484.0 344.5 7213.40 N 1994.23W 10525.00 72.42 344.69 1.58 5565.75 7507.8 344.5 7236.37 N 2000.61W 10550.00 72.62 344.92 1.19 5573.26 7531.7 344.5 7259.39 N 2006.85W 10575.00 72.86 345.45 2.21 5580.68 7555.6 344.5 7282.47 N 2012.96W 10600.00 72.88 345.70 0.96 5588.04 7579.4 344.6 7305.61 N 2018.91W 10625.00 72.52 345.63 1.47 5595.47 7603.3 344.6 7328.73 N 2024.82W 10650.00 72.66 345.77 0.77 5602.95 7627.2 344.6 7351.85 N 2030.71W • 10675.00 10700.00 72.36 345.45 1.72 5610.47 7651.0 344.6 7374.94 N 2036.64W 71.99 345.73 1.83 5618.12 7674.8 344.6 7397.99 N 2042.56W 10725.00 72.28 346.08 1.75 5625.79 7698.6 344.6 7421.07 N 2048.36W 10750.00 72.55 346.47 1.82 5633.34 7722.4 344.6 7444.22 N 2054.01W 10775.00 72.25 346.67 1.42 5640.90 7746.2 344.6 7467.40 N 2059.55W 10800.00 72.71 346.88 1.99 5648.43 7770.0 344.6 7490.61 N 2065.00W 10825.00 72.99 347.73 3.46 5655.80 7793.9 344.6 7513.91 N 2070.25W 10850.00 72.82 348.27 2.15 5663.15 7817.8 344.6 7537.29 N 2075.22W 10875.00 73.38 348.63 2.67 5670.41 7841.6 344.6 7560.72 N 2080.01W 10900.00 73.26 349.46 3.19 5677.59 7865.5 344.6 7584.23 N 2084.56W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 10925.00 73.07 349.32 0.94 5684.83 7889.3 344.6 7607.75 N 2088.96W 10950.00 72.88 349.41 0.82 5692.15 7913.2 344.7 7631.25 N 2093.37W 10975.00 72.95 349.24 0.71 5699.49 7937.0 344.7 7654.73 N 2097.80W 11000.00 73.08 349.11 0.72 5706.80 7960.8 344.7 7678.22 N 2102.29W 11025.00 72.63 348.85 2.05 5714.17 7984.6 344.7 7701.66 N 2106.86W 11050.00 72.73 348.58 1.11 5721.61 8008.4 344.7 7725.07 N 2111.53W 11075.00 72.68 348.61 0.23 5729.04 8032.3 344.7 7748.47 N 2116.25W 11100.00 72.85 348.45 0.92 5736.45 8056.1 344.7 7771.87 N 2121.00W 11125.00 72.70 348.22 1.06 5743.85 8079.9 344.7 7795.25 N 2125.83W 11150.00 72.27 348.10 1.77 5751.38 8103.7 344.8 7818.59 N 2130.72W 11175.00 72.29 347.95 0.61 5758.98 8127.5 344.8 7841.88 N 2135.66W 11200.00 72.53 347.89 0.99 5766.54 8151.3 344.8 7865.19 N 2140.65W • 11225.00 11250.00 72.42 347.81 0.54 5774.07 8175.1 344.8 7888.49 N 2145.66W 72.40 347.56 0.95 5781.62 8198.9 344.8 7911.77 N 2150.75W 11275.00 72.27 347.26 1.25 5789.21 8222.7 344.8 7935.02 N 2155.94W 11300.00 72.27 347.19 0.26 5796.82 8246.5 344.8 7958.25 N 2161.20W 11325.00 72.47 347.15 0.83 5804.39 8270.3 344.8 7981.48 N 2166.49W 11350.00 72.43 346.91 0.93 5811.93 8294.1 344.8 8004.71 N 2171.85W 11375.00 72.36 346.69 0.89 5819.49 8317.9 344.8 8027.91 N 2177.29W 11400.00 72.28 346.49 0.80 5827.08 8341.7 344.8 8051.07 N 2182.81W 11425.00 72.37 346.50 0.34 5834.67 8365.5 344.8 8074.24 N 2188.38W • . A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. II 11450.00 72.67 346.45 1.21 5842.18 8389.4 344.8 8097.42 N 2193.95W 11475.00 72.64 346.44 0.12 5849.64 8413.2 344.8 8120.62 N 2199.55W 11500.00 72.93 346.50 1.19 5857.04 8437.1 344.8 8143.83 N 2205.14W 11525.00 72.89 346.43 0.33 5864.38 8461.0 344.9 8167.07 N 2210.73W 11550.00 72.97 346.48 0.40 5871.72 8484.9 344.9 8190.30 N 2216.33W 11575.00 72.96 346.50 0.08 5879.05 8508.8 344.9 8213.54 N 2221.91W 11600.00 72.62 346.70 1.57 5886.44 8532.6 344.9 8236.77 N 2227.45W 11625.00 72.56 346.63 0.35 5893.92 8556.5 344.9 8259.98 N 2232.95W 11650.00 72.10 346.67 1.84 5901.51 8580.3 344.9 8283.16 N 2238.45W 11675.00 71.18 347.05 3.96 5909.39 8604.0 344.9 8306.27 N 2243.84W 11700.00 70.18 346.96 4.01 5917.66 8627.6 344.9 8329.25 N 2249.15W 11725.00 69.98 347.06 0.88 5926.18 8651.1 344.9 8352.16 N 2254.43 W 11750.00 69.10 347.16 3.55 5934.91 8674.5 344.9 8374.99 N 2259.66W • 11775.00 68.13 347.70 4.36 5944.03 8697.7 344.9 8397.71 N 2264.72W 11800.00 67.89 348.05 1.61 5953.39 8720.9 344.9 8420.37 N 2269.59W 11825.00 67.67 348.03 0.89 5962.84 8744.0 344.9 8443.02 N 2274.39W 11850.00 67.50 347.90 0.83 5972.38 8767.1 344.9 8465.62 N 2279.20W 11875.00 67.39 347.69 0.91 5981.96 8790.1 344.9 8488.19 N 2284.09W 11900.00 67.28 347.66 0.47 5991.60 8813.2 344.9 8510.72 N 2289.01W 11925.00 66.96 347.59 1.29 6001.32 8836.2 345.0 8533.22 N 2293.95W 11950.00 65.72 347.36 5.04 6011.35 8859.1 345.0 8555.57 N 2298.91W 11975.00 64.66 347.13 4.31 6021.84 8881.7 345.0 8577.71 N 2303.92W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 12000.00 64.49 347.06 0.73 6032.58 8904.3 345.0 8599.71 N 2308.96W 12025.00 64.89 347.05 1.58 6043.27 8926.9 345.0 8621.74 N 2314.02W 12050.00 63.70 346.48 5.17 6054.11 8949.4 345.0 8643.67 N 2319.18W 12075.00 63.67 346.32 0.57 6065.19 8971.8 345.0 8665.45 N 2324.45W 12100.00 63.28 345.79 2.47 6076.36 8994.2 345.0 8687.16 N 2329.84W 12125.00 62.80 345.48 2.20 6087.69 9016.4 345.0 8708.74 N 2335.37W 12150.00 63.00 345.28 1.05 6099.08 9038.7 345.0 8730.28 N 2340.98W 12175.00 63.30 344.81 2.09 6110.38 9061.0 345.0 8751.83 N 2346.74W 12200.00 62.77 344.29 2.78 6121.71 9083.3 345.0 8773.30 N 2352.68W 12225.00 62.43 343.87 2.02 6133.21 9105.5 345.0 8794.65 N 2358.76W 12250.00 62.27 343.02 3.08 6144.82 9127.6 345.0 8815.87 N 2365.07W 12275.00 62.22 342.45 2.03 6156.46 9149.7 345.0 8837.00 N 2371.64W III 12300.00 62.02 341.47 3.56 6168.15 9171.8 345.0 8858.01 N 2378.48W 12325.00 61.82 340.81 2.47 6179.92 9193.8 345.0 8878.89 N 2385.61 W 12350.00 61.26 339.64 4.68 6191.83 9215.7 344.9 8899.57 N 2393.04W 12375.00 60.92 339.03 2.53 6203.92 9237.5 344.9 8920.05 N 2400.77W 12400.00 60.82 338.29 2.63 6216.09 9259.2 344.9 8940.39 N 2408.71W 12425.00 60.63 337.33 3.42 6228.31 9280.8 344.9 8960.58 N 2416.95W 12450.00 60.24 336.48 3.34 6240.65 9302.4 344.9 8980.58 N 2425.48 W 12475.00 59.72 335.33 4.49 6253.16 9323.7 344.9 9000.34 N 2434.32W 12500.00 59.28 335.16 1.86 6265.84 9345.0 344.8 9019.90 N 2443.34W 12525.00 59.18 335.06 0.52 6278.63 9366.1 344.8 9039.38 N 2452.38W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 12550.00 58.99 334.80 1.19 6291.48 9387.3 344.8 9058.81 N 2461.47W 12575.00 58.59 334.31 2.31 6304.43 9408.3 344.8 9078.12 N 2470.65W 12600.00 58.19 334.03 1.84 6317.54 9429.2 344.8 9097.28 N 2479.93W 12625.00 57.67 334.45 2.54 6330.81 9450.1 344.7 9116.36 N 2489.14W 12650.00 57.53 334.41 0.55 6344.21 9470.8 344.7 9135.40 N 2498.25W 12675.00 57.50 334.09 1.07 6357.63 9491.6 344.7 9154.40 N 2507.41W 12700.00 56.90 333.94 2.43 6371.17 9512.2 344.7 9173.29 N 2516.62W 12725.00 56.31 333.95 2.36 6384.93 9532.7 344.6 9192.04 N 2525.79W 12750.00 55.53 333.74 3.20 6398.94 9553.1 344.6 9210.63 N 2534.91W 12775.00 55.18 333.61 1.49 6413.15 9573.3 344.6 9229.06 N 2544.04W 12800.00 54.46 333.11 3.29 6427.56 9593.3 344.6 9247.32 N 2553.20W 12825.00 53.45 332.95 4.07 6442.27 9613.1 344.5 9265.34 N 2562.36W • 12850.00 12875.00 52.32 333.05 4.54 6457.35 9632.7 344.5 9283.10 N 2571.41W 51.69 333.05 2.50 6472.74 9652.0 344.5 9300.67 N 2580.34W 12900.00 51.57 333.38 1.15 6488.26 9671.2 344.5 9318.16 N 2589.18W 12925.00 51.74 334.12 2.41 6503.77 9690.5 344.4 9335.75 N 2597.85W 12950.00 51.79 335.00 2.77 6519.24 9709.8 344.4 9353.48 N 2606.28W 12975.00 51.89 335.88 2.80 6534.69 9729.2 344.4 9371.36 N 2614.45W 13000.00 51.33 336.57 3.11 6550.21 9748.6 344.4 9389.29 N 2622.35W 13025.00 50.77 336.80 2.35 6565.93 9767.9 344.4 9407.15 N 2630.05W 13050.00 50.21 336.60 2.33 6581.83 9787.0 344.4 9424.86 N 2637.68W • s A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: DRILLSITE: MPF -PAD WELL: MPF -45, 2.875" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM127 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. III 13075.00 49.30 336.51 3.65 6597.98 9805.9 344.3 9442.37 N 2645.27W 13100.00 48.50 336.33 3.24 6614.42 9824.6 344.3 9459.63 N 2652.81W 13125.00 47.38 336.87 4.73 6631.17 9843.0 344.3 9476.67 N 2660.18W 13150.00 45.93 337.60 6.19 6648.33 9861.0 344.3 9493.43 N 2667.21W 13175.00 44.17 338.18 7.25 6665.99 9878.6 344.3 9509.82 N 2673.87W 13200.00 42.50 339.38 7.44 6684.17 9895.7 344.3 9525.81 N 2680.09W 13225.00 40.43 340.46 8.76 6702.91 9912.2 344.3 9541.35 N 2685.77W 13250.00 38.98 342.01 7.01 6722.14 9928.1 344.3 9556.47 N 2690.91W 13275.00 38.05 343.05 4.53 6741.70 9943.7 344.3 9571.32 N 2695.59W 13300.00 37.42 343.60 2.85 6761.47 9959.0 344.3 9585.98 N 2699.98W 13325.00 37.01 344.16 2.15 6781.38 9974.1 344.3 9600.50 N 2704.18W 13350.00 36.67 345.16 2.75 6801.39 9989.1 344.3 9614.96 N 2708.14 W 13375.00 37.22 345.61 2.45 6821.37 10004.1 344.3 9629.50 N 2711.93W • 13400.00 37.15 347.74 5.16 6841.29 10019.2 344.3 9644.20 N 2715.41W 13425.00 37.90 347.98 3.02 6861.12 10034.4 344.3 9659.09 N 2718.62W 13450.00 38.38 348.55 2.39 6880.78 10049.8 344.3 9674.20 N 2721.76W 13475.00 38.20 349.09 1.52 6900.40 10065.2 344.3 9689.40 N 2724.76W 13500.00 37.47 350.16 3.93 6920.15 10080.5 344.3 9704.48 N 2727.52W 13517.90 37.44 350.94 2.64 6934.36 10091.3 344.3 9715.22 N 2729.31W Final Station Closure: Distance: 10091.31 ft Az: 344.31 deg. BP EXPLORATION ALASKA INC 15 May 15:48 Presented Survey Well: MILNE POINT DRILLSITE: MPF -PAD WELL: MPF -45 2.875" TUBING Gyrodata Location: WELLHEAD, N. SLOPE BOROUGH AK0413GCM127 DEFINITIVE 70 60 • 50 z - 0 _ ~ Q 40 -- z BOTTOM HOLE z LOCATED z - MD: 13517.90 -- - -- -- - - -- -- 0 20 10 I I I 1 1 I I I I ' 0 2000 4000 6000 8000 10000 12000 14000 MEASURED DEPTH (ft) I BP EXPLORATION ALASKA INC 15 May 15:48 Presented Survey Well: MILNE POINT DRILLSITE: MPF -PAD WELL: MPF -45 2.875" TUBING Gyrodata Location: WELLHEAD, N. SLOPE BOROUGH AK0413GCM127 DEFINITIVE 20.0 0.0 4\ , , BOTTOM HOLE LOCATED • 340.0 MD: 13517.90 320.0 = 300.0 t i— j x N 280.0 • 260.0 i 1 ` 240.0 220.0 200.0 ` 1 I i 1 0 2000 4000 6000 8000 10000 12000 14000 MEASURED DEPTH (ft) BP EXPLORATION ALASKA INC 15 May 15:48 Presented Survey Well: MILNE POINT DRILLSITE: MPF -PAD WELL: MPF -45 2.875" TUBING Gyrodata Location: WELLHEAD, N. SLOPE BOROUGH AK0413GCM127 DEFINITIVE 7000 - BOTTOM HOLE LOCATED MD: 13517.90 6000 — • 5000 .. F a 4000 -- w J -- Q U I- H w 3000 2000 - 1000 0 i i I i i i I I i I I I I I i I 1 I I I 0 2000 4000 6000 8000 10000 12000 14000 MEASURED DEPTH (ft) 1 BP EXPLORATION ALASKA INC 15 May 15:48 Presented Survey Well: MILNE POINT DRILLSITE: MPF -PAD WELL: MPF -45 2.875" TUBING Gyrodata Location: WELLHEAD, N. SLOPE BOROUGH AK0413GCM127 DEFINITIVE 9 • 8 A. i MP • • 0 o - 1-4 _ rn a) • ` 5 S 1 • • Li) • • w cn 4 — • • C.9 • J • • • • • • BOTTOM HOLE a , -1 1 • • • !LOCATED 2__ • MD 13517:90 1 ki 4 1 .1 1 - 1) 1 I , 411 I I f • 1 I I � fl • 1 ( �, !, ( i II I I 1 I I 1 ' . .I • l I 1 ! I � I - J I I 1 I 1 0 0 2000 4000 6000 8000 10000 12000 14000 MEASURED DEPTH (ft) BP EXPLORATION ALASKA INC 15 May 15:49 Presented Survey Well: MILNE POINT DRILLSITE: MPF -PAD WELL: MPF -45 2.875" TUBING Gyrodata Location: WELLHEAD, N. SLOPE BOROUGH AK0413GCM127 DEFINITIVE 10000 BOTTOM HOB.: - LOCATED - MD: 13517.90 8000 - .1 . - 7000 -- 6000 - C7 z 5000 - 0 - z 4000 - •3000 2000 1000 - 0 - I I I I I I! I I l l l 1 1 1 1 1 1 1 1 1 1 1 -2500 -2000 -1500 -1000 -500 0 EASTING (ft) • • , Survey QC - RGS -CT Specification Sheet • • ` to . If SURVEY QUALITY CONTROL - SPECIFICATION DATA PRE-30B CALIBRATION VERIFICATION CHECK (ROLL TEST) Station ToolFace Gravity Error Scale Factor Rate Error (deg) (Mg) Uncertainty (deg /min) 64 270.75 - 2838.81 - 0.00070715 -3.40 63 270.75 - 2833.69 - 0.00070588 -4.07 62 225.40 - 1525.27 - 0.00038158 -3.03 61 225.40 - 1529.72 - 0.00038269 -2.85 60 45.24 - 1487.45 - 0.00037214 -2.91 59 45.25 - 1484.59 - 0.00037143 -5.40 58 0.64 288.33 0.00007197 -6.00 57 0.64 294.18 0.00007343 -6.85 56 330.20 - 281.83 - 0.00007011 -8.13 55 330.20 - 273.21 - 0.00006797 -9.17 54 300.09 - 1860.85 - 0.00046249 -5.65 53 300.09 - 1856.74 - 0.00046148 -7.41 52 270.85 - 2834.42 - 0.00070605 -0.40 51 270.85 - 2833.19 - 0.00070575 -2.30 50 239.97 - 2262.41 - 0.00056547 1.38 49 239.97 - 2260.54 - 0.00056501 0.82 48 210.81 - 737.11 - 0.00018441 -2.79 47 210.81 - 735.94 - 0.00018412 -3.21 46 179.38 294.33 0.00007346 -4.69 45 179.38 297.85 0.00007434 -3.40 44 149.50 - 314.15 - 0.00007815 -4.48 43 149.50 - 309.82 - 0.00007708 -2.23 42 119.48 - 1870.68 - 0.00046497 -3.89 41 119.48 - 1871.22 - 0.00046510 -5.60 40 90.93 - 2814.21 - 0.00070104 -3.03 39 90.93 - 2806.82 - 0.00069921 -5.78 38 60.62 - 2269.11 - 0.00056714 -2.13 37 60.62 - 2262.99 - 0.00056562 -2.95 36 30.09 - 685.28 - 0.00017145 -5.06 35 30.10 - 686.54 - 0.00017176 -3.00 34 0.71 281.42 0.00007025 -8.23 33 0.71 288.00 0.00007189 -10.60 32 270.26 - 2824.00 - 0.00070353 -1.90 31 270.27 - 2824.76 - 0.00070371 -3.88 30 225.07 - 1481.14 - 0.00037056 -2.51 29 225.07 - 1483.01 - 0.00037103 -3.50 28 45.19 - 1449.24 -0.00036261 -2.84 27 45.19 - 1451.27 - 0.00036311 -4.51 26 0.53 322.75 0.00008057 -5.70 25 0.53 323.94 0.00008087 -6.34 24 329.89 - 261.27 - 0.00006500 -6.89 23 329.89 - 262.60 - 0.00006533 -9.17 22 300.37 - 1824.08 - 0.00045337 -6.02 21 300.38 - 1816.42 - 0.00045148 -7.33 20 271.20 - 2810.02 - 0.00069998 -2.84 19 271.21 - 2808.85 - 0.00069969 -4.86 18 240.72 - 2262.84 - 0.00056558 0.28 17 240.72 - 2256.85 - 0.00056409 0.49 16 210.09 - 665.85 - 0.00016659 1.68 15 210.09 - 668.08 - 0.00016715 1.25 14 181.29 308.28 0.00007696 -1.49 13 181.29 305.73 0.00007633 -3.23 12 149.76 - 253.81 - 0.00006315 -5.43 11 149.77 - 252.77 - 0.00006289 -4.68 10 118.41 - 1881.39 - 0.00046768 -3.90 9 118.41 - 1879.60 - 0.00046724 -4.98 8 89.26 - 2788.10 - 0.00069472 -2.66 7 89.27 - 2783.03 - 0.00069347 -1.80 6 60.11 - 2198.01 - 0.00054945 1.50 5 60.11 - 2197.23 -0.00054925 2.69 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 1 of 15 AK0413GCM127 a • • Survey QC - RGS -CT Specification Sheet • 0 I 0 0 4 29.89 - 631.14 - 0.00015792 -0.39 3 29.89 - 630.28 - 0.00015770 0.28 2 0.67 313.65 0.00007830 -1.69 1 0.67 314.44 0.00007850 0.22 MBO = -1.06 Gravity Error = - 1289.68 Scale Factor Uncertainty = - 0.00032164 Rate Error = -3.54 POST CALIBRATION VERIFICATION CHECK (ROLL TEST) Station ToolFace Gravity Error Scale Factor Rate Error (deg) (Mg) Uncertainty (deg /min) 24808 269.99 - 738.23 - 0.00018468 -6.61 24807 269.99 - 730.27 - 0.00018270 -9.34 24806 225.46 - 1354.19 -0.00033890 -12.92 24805 225.46 - 1358.89 - 0.00034007 -19.03 24804 46.00 - 1324.60 - 0.00033152 -6.66 24803 46.00 - 1322.03 - 0.00033088 -9.04 24802 0.09 - 1504.07 - 0.00037408 -8.55 24801 0.09 - 1496.96 - 0.00037231 -9.38 24800 332.25 - 1147.21 - 0.00028492 -4.83 24799 332.25 - 1133.17 - 0.00028144 -7.15 24798 300.27 - 727.43 - 0.00018120 -3.99 24797 300.27 - 724.59 -0.00018049 -3.71 24796 270.40 - 731.91 - 0.00018310 -4.77 24795 270.40 - 729.84 - 0.00018258 -5.10 24794 240.09 - 1126.24 - 0.00028213 -3.82 24793 240.09 - 1119.64 - 0.00028049 -4.79 24792 209.12 - 1527.14 - 0.00038138 0.36 24791 209.12 - 1524.16 - 0.00038064 -1.36 24790 180.11 - 1499.12 - 0.00037285 -5.97 24789 180.12 - 1496.65 - 0.00037224 -5.90 24788 150.14 - 1092.78 - 0.00027143 -5.22 24787 150.14 - 1079.05 - 0.00026803 -5.38 24786 121.40 - 707.07 - 0.00017611 -2.90 24785 121.39 - 704.40 - 0.00017545 -1.14 24784 91.58 - 688.30 - 0.00017217 -3.85 24783 91.58 - 676.87 - 0.00016932 -5.08 24782 60.98 - 1087.58 -0.00027247 -0.09 24781 60.98 - 1079.27 - 0.00027039 -1.59 24780 30.75 - 1479.80 - 0.00036967 -3.72 24779 30.75 - 1479.95 - 0.00036971 -3.47 24778 0.23 - 1462.88 - 0.00036387 -5.76 24777 0.23 - 1457.87 - 0.00036263 -6.47 24776 270.31 - 695.22 - 0.00017393 -4.61 24775 270.31 - 687.27 - 0.00017195 -5.66 24774 224.42 - 1310.18 - 0.00032788 -16.27 24773 224.42 - 1310.59 - 0.00032799 -19.13 24772 45.58 - 1267.63 - 0.00031729 -2.89 24771 45.58 - 1265.67 - 0.00031680 -3.73 24770 0.29 - 1439.94 - 0.00035818 -3.99 24769 0.29 - 1431.64 - 0.00035613 -3.94 24768 330.91 - 1059.15 - 0.00026310 -2.97 24767 330.91 - 1051.31 - 0.00026115 -3.36 24766 302.02 - 688.73 - 0.00017154 -3.45 24765 302.02 - 690.61 - 0.00017200 -2.93 24764 270.95 - 658.60 - 0.00016477 -2.96 24763 270.95 - 666.43 - 0.00016673 -2.89 24762 240.65 - 1046.22 - 0.00026213 -3.21 24761 240.65 - 1037.42 - 0.00025993 -3.57 24760 210.58 - 1461.96 - 0.00036522 -3.68 24759 210.58 - 1453.46 - 0.00036310 -4.05 24758 180.04 - 1454.68 -0.00036183 -3.61 24757 180.04 - 1448.82 - 0.00036037 -3.88 24756 149.74 - 1033.59 - 0.00025676 -2.69 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 2 of 15 AK0413GCM127 r • • Survey QC - RGS -CT Specification Sheet • • • 24755 149.74 - 1032.94 - 0.00025660 -3.01 24754 119.93 - 615.24 - 0.00015330 0.17 24753 119.93 - 608.89 - 0.00015172 0.05 24752 91.90 - 558.02 - 0.00013962 -1.25 24751 91.90 - 551.28 - 0.00013793 -0.88 24750 59.50 - 984.70 - 0.00024675 -2.41 24749 59.50 - 979.31 - 0.00024540 -2.86 24748 30.39 - 1440.37 - 0.00035983 -3.43 24747 30.39 - 1429.12 - 0.00035703 -3.74 24746 0.33 - 1492.04 - 0.00037111 -5.10 24745 0.33 - 1490.42 - 0.00037070 -4.54 MBO = -1.49 Gravity Error = - 1103.96 Scale Factor Uncertainty = - 0.00027545 Rate Error = -4.81 INITIALISATION Gyro Compass Reading / Station Raw Inclination Raw Azimuth Abs (ER ERn,e°) 99 9.91 346.20 0.3353 100 9.91 346.15 0.3040 102 9.91 346.27 0.3261 103 9.91 346.34 0.3012 104 9.91 346.46 0.2978 105 9.91 346.38 0.3285 Average 9.91 346.30 0.3155 Tolerance on Average* 0.0830 Standard Deviation 0.00 0.11 0.0163 Tolerance on St. Dev. ** 0.1 0.2° 0.0401 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance on Average of earth horizontal rate difference is given by (1 /CosI) * .1[(CosA *SinI *0.1) +0.08 0 /hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1 /Cost) *J[(CosA *SinI *0.1) +(0.08 /(n -1))] ° /hr DRIFT TUNES Drift Tune Ending Ending Ending Ending Residual Gx Bias Residual Gy Bias Number Time Depth Inclination Azimuth Start End Start End 1 564.91 2150.00 14.99 344.22 -0.003 0.001 -0.001 0.001 2 1076.33 3450.18 51.24 344.72 0.002 -0.004 0.006 -0.005 3 1194.61 5267.50 72.30 345.50 -0.009 0.009 -0.003 0.004 4 4773.99 13502.38 37.67 350.35 -0.002 0.007 -0.006 0.003 5 2121.50 11450.02 73.05 345.87 0.001 0.001 0.001 -0.000 6 2110.53 9000.04 71.33 341.76 0.003 -0.001 0.001 -0.000 7 2037.18 5999.63 71.32 345.65 0.003 -0.001 0.001 -0.000 8 2032.53 2549.27 29.04 344.81 0.008 -0.008 -0.006 0.003 9 676.37 2149.85 16.19 345.25 0.000 -0.000 -0.002 0.003 10 595.86 1699.65 10.58 342.47 0.002 -0.000 -0.003 0.004 Average 0.000 0.000 -0.001 0.001 Standard Deviation 0.005 0.005 0.004 0.003 Tolerance for both the Average and the Standard Deviation 0.033 ° /hr 0.033 ° /hr 0.033 ° /hr 0.033 ° /hr SURV -Q167 (OPS SUR-MA -003) 19`" Nov 03 1 Rev 15 Page 3 of 35 AK0413GCM127 r • • . Survey QC - RGS -CT Specification Sheet gy I " • INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARISON Depth Corrected Inclination Corrected Azimuth Inrun * I Outrun * I Difference Inrun * I Outrun * I Difference 100.00 0.32 0.05 0.28 19.93 341.44 38.49 200.00 0.13 0.08 0.06 17.21 260.79 116.42 300.00 0.18 0.17 0.01 344.73 207.28 137.46 400.00 0.12 0.33 -0.21 242.67 224.23 18.44 500.00 0.40 0.49 -0.09 192.88 225.81 -32.93 600.00 0.42 0.64 -0.23 208.95 214.17 -5.22 700.00 0.75 0.73 0.02 202.67 204.58 -1.91 800.00 0.81 0.74 0.07 206.62 197.59 9.03 900.00 0.86 0.76 0.09 211.63 234.42 -22.79 1000.00 0.75 0.78 -0.03 292.81 308.67 -15.87 1100.00 1.22 1.23 -0.01 330.50 346.04 -15.54 1200.00 2.28 2.26 0.02 337.93 350.01 -12.08 1300.00 3.70 3.67 0.02 346.02 352.44 -6.43 1400.00 5.43 5.34 0.08 348.95 353.08 -4.13 1500.00 7.35 7.05 0.29 348.61 347.65 0.96 1600.00 8.32 8.61 -0.29 348.68 344.94 3.75 1700.00 9.67 9.69 -0.03 344.38 344.32 0.06 1725.00 9.96 9.88 0.08 343.57 343.30 0.27 1750.00 10.07 10.10 -0.03 343.61 342.41 1.20 1775.00 10.16 10.14 0.02 342.57 342.65 -0.08 1800.00 10.14 10.25 -0.10 342.16 341.47 0.69 1825.00 10.15 10.22 -0.07 342.35 341.32 1.03 1850.00 10.15 10.30 -0.15 342.44 342.80 -0.36 1875.00 10.17 10.37 -0.20 342.46 341.54 0.92 1900.00 10.22 10.49 -0.26 341.52 341.03 0.49 1925.00 10.27 10.58 -0.32 341.63 341.11 0.52 1950.00 10.37 10.66 -0.29 341.40 341.87 -0.48 1975.00 10.48 10.81 -0.33 341.22 341.52 -0.30 2000.00 10.86 11.17 -0.31 341.81 341.64 0.17 2025.00 11.34 11.64 -0.30 342.27 342.88 -0.61 2050.00 11.79 11.99 -0.20 342.36 342.72 -0.36 2075.00 12.16 12.28 -0.13 342.58 343.11 -0.53 2100.00 12.72 12.82 -0.10 342.94 343.74 -0.80 2125.00 13.56 13.64 -0.08 342.45 343.40 -0.95 2150.00 14.70 14.67 0.02 344.05 344.95 -0.91 2175.00 15.63 15.43 0.21 344.57 345.41 -0.84 2200.00 16.25 16.30 -0.05 344.91 345.66 -0.75 2225.00 17.07 17.21 -0.13 345.83 346.45 -0.62 2250.00 18.12 18.30 -0.18 346.04 346.47 -0.44 2275.00 18.90 19.06 -0.16 346.22 346.70 -0.49 2300.00 19.68 19.73 -0.05 345.98 346.79 -0.82 SURV -Q167 (OPS SUR -MA -003) 19` Nov 03 / Rev 15 Page 4 of 15 AK0413GCM127 ■ • • Survey QC - RGS -CT Specification Sheet • • ` it « if 2325.00 20.14 20.34 -0.21 345.93 346.39 -0.46 2350.00 20.85 21.05 -0.19 346.22 346.98 -0.76 2375.00 21.90 22.03 -0.13 346.41 347.17 -0.76 2400.00 22.85 22.96 -0.11 346.09 346.83 -0.74 2425.00 23.68 23.69 -0.00 345.83 346.58 -0.76 2450.00 24.36 24.52 -0.16 345.61 346.21 -0.60 2475.00 25.12 25.21 -0.10 345.54 346.20 -0.67 2500.00 26.12 26.20 -0.08 345.24 345.90 -0.66 2525.00 26.83 26.94 -0.11 344.93 345.63 -0.70 2550.00 27.51 27.50 0.00 344.58 345.38 -0.80 2575.00 28.21 28.36 -0.15 344.26 344.97 -0.71 2600.00 28.93 29.06 -0.13 344.10 344.78 -0.68 2625.00 29.83 30.03 -0.20 344.27 344.82 -0.55 2650.00 30.71 30.73 -0.02 344.44 345.08 -0.64 2675.00 31.31 31.32 -0.01 344.64 345.26 -0.62 2700.00 31.89 31.97 -0.08 344.88 345.46 -0.58 2725.00 32.47 32.60 -0.14 345.35 345.95 -0.60 2750.00 33.25 33.38 -0.13 345.99 346.47 -0.48 2775.00 33.87 33.92 -0.05 346.10 346.71 -0.60 2800.00 34.41 34.57 -0.16 346.14 346.62 -0.48 2825.00 35.12 35.19 -0.07 346.21 346.80 -0.60 2850.00 35.84 36.04 -0.20 346.14 346.68 -0.54 2875.00 36.85 36.92 -0.07 345.78 346.40 -0.62 2900.00 37.73 37.83 -0.10 345.77 346.37 -0.61 2925.00 38.39 38.49 -0.10 345.71 346.25 -0.54 2950.00 39.36 39.46 -0.10 345.67 346.17 -0.50 2975.00 40.17 40.33 -0.15 345.57 346.07 -0.50 3000.00 41.14 41.28 -0.14 345.40 345.89 -0.49 3025.00 42.18 42.26 -0.09 345.12 345.67 -0.55 3050.00 42.71 42.82 -0.11 345.08 345.57 -0.49 3075.00 43.25 43.35 -0.10 345.05 345.55 -0.50 3100.00 44.03 44.13 -0.11 344.79 345.25 -0.45 3125.00 44.85 44.97 -0.12 344.83 345.30 -0.46 3150.00 45.86 45.91 -0.05 344.87 345.37 -0.50 3175.00 46.39 46.49 -0.10 344.90 345.37 -0.47 3200.00 46.84 46.92 -0.09 344.96 345.47 -0.51 3225.00 47.24 47.34 -0.10 344.97 345.50 -0.52 3250.00 47.57 47.66 -0.09 345.05 345.53 -0.47 3275.00 47.84 47.96 -0.12 345.25 345.70 -0.45 3300.00 48.16 48.33 -0.17 345.35 345.82 -0.47 3325.00 48.59 48.70 -0.11 345.38 345.85 -0.47 3350.00 49.08 49.22 -0.14 345.42 345.90 -0.47 3375.00 49.49 49.61 -0.12 345.41 345.88 -0.47 3400.00 49.82 49.94 -0.12 345.30 345.81 -0.51 SURV -Q167 (OPS SUR -MA -003) 19` Nov 03 / Rev 15 Page 5 of 15 AK04136CM127 • • Survey QC - RGS -CT Specification Sheet . • ' • 3425.00 50.21 50.34 -0.13 345.24 345.70 -0.46 3450.00 50.64 50.72 -0.08 345.28 345.73 -0.45 3475.00 51.67 51.71 -0.04 344.69 345.12 -0.43 3500.00 52.38 52.47 -0.09 344.63 345.07 -0.44 3525.00 53.04 53.19 -0.14 344.24 344.74 -0.50 3550.00 53.61 53.67 -0.07 343.93 344.31 -0.38 3575.00 54.16 54.24 -0.07 343.75 344.16 -0.41 3600.00 54.99 54.96 0.03 342.08 342.44 -0.36 3625.00 55.50 55.58 -0.08 341.65 342.14 -0.48 3650.00 56.35 56.39 -0.04 341.17 341.83 -0.66 3675.00 57.01 56.94 0.06 340.83 341.34 -0.51 3700.00 57.78 57.80 -0.02 340.91 341.37 -0.45 3725.00 59.04 59.07 -0.03 340.96 341.45 -0.50 3750.00 59.84 59.86 -0.02 341.31 341.74 -0.43 3775.00 60.20 60.25 -0.06 341.38 341.88 -0.50 3800.00 60.67 60.68 -0.01 341.57 342.03 -0.46 1 3825.00 61.14 61.16 -0.02 341.70 342.16 -0.46 3850.00 61.68 61.76 -0.08 341.95 342.44 -0.49 3875.00 62.13 62.16 -0.03 342.09 342.52 -0.43 3900.00 62.60 62.61 -0.01 342.17 342.56 -0.39 3925.00 62.98 63.02 -0.04 342.16 342.56 -0.40 3950.00 63.44 63.45 -0.01 342.13 342.53 -0.40 3975.00 63.56 63.63 -0.08 342.21 342.58 -0.37 4000.00 63.96 64.01 -0.05 342.20 342.64 -0.44 4025.00 64.43 64.57 -0.13 342.12 342.55 -0.43 4050.00 65.05 65.07 -0.01 342.22 342.57 -0.34 4075.00 65.53 65.55 -0.02 342.21 342.54 -0.33 4100.00 66.25 66.36 -0.11 342.08 342.48 -0.39 4125.00 66.66 66.72 -0.05 342.09 342.47 -0.38 4150.00 66.95 66.96 -0.02 341.84 342.24 -0.40 4175.00 67.08 67.14 -0.07 341.69 342.07 -0.37 4200.00 67.05 67.12 -0.07 341.68 342.06 -0.38 4225.00 66.77 66.85 -0.08 341.46 341.82 -0.36 4250.00 66.69 66.77 -0.08 341.42 341.85 -0.43 4275.00 66.76 66.88 -0.12 341.38 341.76 -0.38 4300.00 66.64 66.72 -0.08 341.37 341.70 -0.33 4325.00 66.66 66.74 -0.07 341.45 341.81 -0.37 4350.00 67.18 67.25 -0.07 341.43 341.74 -0.32 4375.00 67.68 67.69 -0.01 341.42 341.76 -0.35 4400.00 68.31 68.25 0.05 341.41 341.78 -0.37 4425.00 68.82 68.76 0.07 341.50 341.86 -0.36 4450.00 69.28 69.26 0.03 341.61 341.95 -0.34 4475.00 69.84 69.80 0.04 341.71 342.00 -0.29 4500.00 70.05 70.12 -0.07 341.75 342.05 -0.31 4525.00 70.23 70.30 -0.07 341.76 342.04 -0.28 SURV -Q167 (OPS SUR -MA -003) 19`" Nov 03 / Rev 15 Page 6 of 15 AK0413GCM127 • • . Survey QC - RGS -CT Specification Sheet • si .. 0 4550.00 70.18 70.24 -0.06 341.87 342.15 -0.29 4575.00 69.92 69.91 0.02 341.76 342.06 -0.29 4600.00 69.87 69.90 -0.03 341.74 342.06 -0.32 4625.00 70.22 70.26 -0.03 342.00 342.28 -0.27 4650.00 70.67 70.66 0.02 342.38 342.61 -0.23 4675.00 71.05 71.03 0.02 343.08 343.36 -0.28 4700.00 71.31 71.35 -0.03 343.25 343.51 -0.26 4725.00 71.07 71.10 -0.04 343.31 343.62 -0.30 4750.00 70.95 71.14 -0.18 343.45 343.75 -0.29 4775.00 70.67 70.71 -0.04 343.33 343.64 -0.31 4800.00 70.63 70.66 -0.03 343.23 343.51 -0.28 4825.00 70.39 70.40 -0.01 343.05 343.33 -0.28 4850.00 70.07 70.12 -0.06 342.83 343.14 -0.31 4875.00 70.12 70.25 -0.13 342.87 343.11 -0.24 4900.00 69.89 69.97 -0.08 342.86 343.11 -0.25 4925.00 69.63 69.72 -0.09 343.13 343.39 -0.26 4950.00 69.60 69.61 -0.01 343.54 343.78 -0.23 4975.00 69.47 69.50 -0.03 344.10 344.31 -0.21 5000.00 69.57 69.70 -0.13 344.45 344.67 -0.22 5025.00 69.67 69.68 -0.01 344.47 344.70 -0.22 5050.00 70.06 70.09 -0.03 344.65 344.88 -0.23 5075.00 70.40 70.37 0.03 344.85 345.06 -0.21 5100.00 71.32 71.28 0.04 344.87 345.08 -0.20 5125.00 71.74 71.87 -0.13 344.89 345.07 -0.18 5150.00 71.99 72.08 -0.09 345.19 345.40 -0.21 5175.00 72.27 72.38 -0.11 345.16 345.40 -0.24 5200.00 72.27 72.31 -0.04 345.32 345.51 -0.20 5225.00 72.14 72.18 -0.04 345.38 345.61 -0.23 5250.00 72.35 72.39 -0.04 345.53 345.73 -0.20 5275.00 72.19 72.27 -0.08 345.48 345.72 -0.24 5300.00 71.99 72.05 -0.06 345.71 345.93 -0.22 5325.00 71.88 71.95 -0.07 345.70 345.94 -0.24 5350.00 71.80 71.92 -0.12 345.96 346.17 -0.21 5375.00 72.07 72.24 -0.17 346.11 346.31 -0.20 5400.00 71.99 72.09 -0.10 346.12 346.31 -0.19 5425.00 71.68 71.76 -0.08 346.06 346.30 -0.24 5450.00 71.51 71.60 -0.09 345.87 346.11 -0.24 5475.00 71.38 71.56 -0.18 346.04 346.24 -0.20 5500.00 71.58 71.72 -0.14 346.13 346.34 -0.22 5525.00 71.32 71.41 -0.09 346.00 346.21 -0.21 5550.00 71.02 71.09 -0.08 346.02 346.23 -0.21 5575.00 70.79 70.89 -0.10 345.89 346.13 -0.25 5600.00 70.44 70.67 -0.22 345.95 346.26 -0.31 5625.00 70.36 70.52 -0.16 345.89 346.14 -0.25 SURV -Q167 (OPS SUR -MA -003) 19`" Nov 03 / Rev 15 Page 7 of 15 AK04136CM127 • ' Survey QC - RGS -CT Specification Sheet • • ` • 40 - ` 5650.00 69.88 69.97 -0.10 345.76 345.98 -0.22 5675.00 69.74 69.82 -0.08 345.62 345.83 -0.22 5700.00 69.89 70.00 -0.12 345.63 345.86 -0.23 5725.00 70.00 70.20 -0.20 345.61 345.85 -0.25 5750.00 70.32 70.38 -0.06 345.59 345.78 -0.19 5775.00 70.57 70.67 -0.09 345.70 345.88 -0.18 5800.00 71.18 71.26 -0.07 345.80 346.02 -0.21 5825.00 71.60 71.67 -0.06 345.87 346.04 -0.17 5850.00 71.85 71.99 -0.14 345.90 346.10 -0.19 5875.00 71.92 72.05 -0.13 345.77 345.95 - 0.18 5900.00 71.87 71.98 -0.11 345.71 345.87 -0.17 5925.00 71.76 71.89 -0.13 345.60 345.76 -0.17 5950.00 71.69 71.81 -0.12 345.57 345.77 -0.21 5975.00 71.59 71.78 -0.19 345.56 345.77 -0.22 6000.00 71.68 71.78 -0.10 345.53 345.69 -0.16 6025.00 71.51 71.60 -0.09 345.49 345.65 -0.16 6050.00 71.24 71.36 -0.12 345.47 345.61 -0.13 6075.00 71.23 71.36 -0.13 345.50 345.64 -0.14 6100.00 71.11 71.13 -0.02 345.48 345.62 -0.14 6125.00 70.93 70.84 0.09 345.35 345.48 -0.12 6150.00 71.06 70.97 0.09 345.40 345.55 -0.15 6175.00 71.28 71.20 0.08 345.39 345.49 -0.10 6200.00 71.63 71.57 0.06 345.29 345.44 -0.15 6225.00 71.93 71.92 0.01 345.17 345.32 -0.15 6250.00 71.92 71.85 0.07 345.10 345.26 -0.16 6275.00 71.91 71.84 0.08 345.22 345.38 -0.15 6300.00 71.20 71.16 0.05 345.11 345.24 -0.13 6325.00 71.18 71.14 0.04 345.20 345.32 -0.12 6350.00 71.35 71.33 0.02 345.12 345.28 -0.16 6375.00 71.29 71.21 0.08 344.99 345.11 -0.12 6400.00 71.20 71.15 0.05 345.08 345.21 -0.13 6425.00 71.17 71.09 0.08 345.02 345.19 -0.17 6450.00 71.60 71.50 0.09 345.25 345.35 -0.10 6475.00 72.16 72.02 0.14 345.28 345.41 -0.13 6500.00 72.48 72.44 0.05 345.54 345.68 -0.14 6525.00 72.42 72.37 0.05 345.69 345.82 -0.13 6550.00 72.01 71.95 0.06 345.62 345.76 -0.14 6575.00 72.13 72.20 -0.06 345.57 345.65 -0.08 6600.00 72.43 72.40 0.03 345.41 345.56 -0.15 6625.00 72.17 72.12 0.06 345.26 345.40 -0.15 6650.00 72.22 72.18 0.04 345.32 345.42 -0.10 6675.00 71.42 71.52 -0.10 345.10 345.32 -0.23 6700.00 70.95 70.92 0.03 345.18 345.30 -0.12 6725.00 71.52 71.44 0.08 345.04 345.17 -0.14 SURV -Q167 (OPS SUR -MA -003) 19th Nov 03 / Rev 15 Page 8 of 15 AK0413GCM127 • • Survey QC - RGS -CT Specification Sheet • • • ., 3 6750.00 71.74 71.71 0.03 344.88 344.97 -0.09 6775.00 72.12 72.11 0.02 344.67 344.76 -0.09 6800.00 71.52 71.53 -0.01 344.32 344.45 -0.13 6825.00 71.50 71.53 -0.03 344.05 344.15 -0.09 6850.00 71.80 71.82 -0.01 343.83 343.96 -0.13 6875.00 71.55 71.52 0.03 343.43 343.53 -0.11 6900.00 71.65 71.62 0.02 343.39 343.46 -0.07 6925.00 71.51 71.52 -0.01 342.97 343.11 -0.14 6950.00 71.63 71.65 -0.02 342.73 342.84 -0.11 6975.00 71.61 71.63 -0.02 342.63 342.73 -0.10 7000.00 71.11 71.11 -0.00 342.15 342.27 -0.12 7025.00 70.88 70.86 0.02 341.86 341.94 -0.07 7050.00 70.78 70.79 -0.01 341.74 341.86 -0.12 7075.00 70.90 70.95 -0.05 341.63 341.75 -0.12 7100.00 71.11 71.11 0.00 341.63 341.74 -0.11 7125.00 71.72 71.73 -0.01 342.33 342.43 -0.10 7150.00 72.25 72.24 0.01 342.37 342.44 -0.08 7175.00 72.06 72.15 -0.10 342.49 342.57 -0.08 7200.00 72.27 72.28 -0.02 342.59 342.71 -0.12 7225.00 72.11 72.12 -0.01 342.30 342.39 -0.09 7250.00 72.15 72.18 -0.03 342.13 342.24 -0.11 7275.00 72.12 72.15 -0.04 342.29 342.40 -0.11 7300.00 72.29 72.33 -0.04 342.30 342.44 -0.14 7325.00 72.41 72.47 -0.06 342.10 342.17 -0.08 7350.00 72.41 72.45 -0.04 342.06 342.17 -0.10 7375.00 72.05 72.11 -0.05 342.24 342.33 -0.10 7400.00 71.75 71.80 -0.04 342.70 342.78 -0.08 7425.00 71.37 71.44 -0.07 343.07 343.14 -0.08 7450.00 71.08 71.10 -0.02 343.50 343.59 -0.09 7475.00 71.03 71.08 -0.05 343.46 343.56 -0.09 7500.00 70.81 70.88 -0.07 343.19 343.28 -0.09 7525.00 70.88 70.93 -0.05 343.12 343.21 -0.09 7550.00 70.94 71.03 -0.10 343.06 343.13 -0.08 7575.00 70.96 71.05 -0.08 342.78 342.92 -0.14 7600.00 70.25 70.29 -0.04 342.89 342.98 -0.08 7625.00 69.78 69.83 -0.05 342.65 342.74 -0.09 7650.00 70.21 70.26 -0.04 342.64 342.72 -0.08 7675.00 70.70 70.75 -0.05 342.75 342.81 -0.07 7700.00 71.19 71.23 -0.04 343.21 343.28 -0.07 7725.00 71.47 71.56 -0.09 343.42 343.52 -0.10 7750.00 71.22 71.28 -0.06 343.53 343.65 -0.13 7775.00 71.20 71.25 -0.06 343.72 343.79 -0.07 7800.00 71.57 71.66 -0.09 343.70 343.77 -0.08 7825.00 71.34 71.41 -0.08 343.73 343.80 -0.08 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 9 of 15 AK0413GCM127 • • > Survey QC - RGS -CT Specification Sheet • I • 7850.00 70.85 70.92 -0.07 343.74 343.80 -0.06 7875.00 70.90 70.95 -0.05 343.60 343.68 -0.08 7900.00 70.91 70.97 -0.06 343.75 343.83 -0.08 7925.00 71.05 71.14 -0.09 343.88 343.91 -0.04 7950.00 71.00 71.05 -0.05 343.58 343.66 -0.08 7975.00 70.83 70.90 -0.07 344.17 344.22 -0.05 8000.00 70.95 71.00 -0.05 344.48 344.52 -0.04 8025.00 71.01 71.05 -0.05 344.46 344.49 -0.03 8050.00 71.16 71.24 -0.08 344.32 344.34 -0.02 8075.00 70.86 70.92 -0.06 344.03 344.09 -0.07 8100.00 70.53 70.61 -0.08 343.67 343.71 -0.04 8125.00 70.32 70.38 -0.05 343.34 343.40 -0.06 8150.00 70.13 70.20 -0.07 343.23 343.28 -0.05 8175.00 70.15 70.21 -0.06 342.98 343.07 -0.09 8200.00 70.02 70.08 -0.06 342.74 342.81 -0.06 8225.00 69.81 69.87 -0.07 342.61 342.65 -0.04 8250.00 70.35 70.43 -0.08 342.46 342.52 -0.06 8275.00 70.78 70.83 -0.06 342.68 342.71 -0.03 8300.00 70.94 71.01 -0.06 342.77 342.84 -0.07 8325.00 71.22 71.27 -0.05 342.52 342.57 -0.05 8350.00 71.34 71.41 -0.07 342.67 342.75 -0.08 8375.00 71.74 71.79 -0.05 342.74 342.80 -0.05 8400.00 71.89 71.95 -0.06 342.93 342.99 -0.06 8425.00 72.00 72.05 -0.04 342.93 342.99 -0.06 8450.00 71.99 72.04 -0.06 342.82 342.88 -0.06 8475.00 71.54 71.62 -0.08 342.82 342.91 -0.08 8500.00 71.43 71.49 -0.05 342.84 342.88 -0.04 8525.00 71.65 71.71 -0.06 343.00 343.04 -0.05 8550.00 72.05 72.11 -0.05 343.17 343.21 -0.04 8575.00 72.28 72.35 -0.07 343.51 343.53 -0.02 8600.00 72.18 72.26 -0.08 343.64 343.66 -0.03 8625.00 72.03 72.10 -0.06 343.42 343.46 -0.05 8650.00 72.07 72.14 -0.06 343.32 343.35 -0.02 8675.00 71.90 71.96 -0.06 343.17 343.20 -0.02 8700.00 71.62 71.68 -0.05 343.04 343.08 -0.04 8725.00 71.80 71.81 -0.01 343.16 343.21 -0.05 8750.00 72.39 72.39 0.00 343.37 343.43 -0.06 8775.00 72.82 72.90 -0.07 343.74 343.78 -0.04 8800.00 72.84 72.88 -0.05 343.77 343.79 -0.01 8825.00 72.72 72.83 -0.11 343.46 343.48 -0.03 8850.00 72.55 72.59 -0.04 343.26 343.29 -0.03 8875.00 72.57 72.61 -0.04 343.24 343.17 0.06 8900.00 72.79 72.85 -0.06 343.04 343.07 -0.03 8925.00 72.68 72.73 -0.05 342.88 342.90 -0.02 SURV -Q167 (OPS SUR -MA -003) 19`" Nov 03 / Rev 15 Page 10 of 15 AK0413GCM127 4 • Survey QC - RGS -CT Specification Sheet • • # o # 8950.00 72.47 72.52 -0.05 342.32 342.36 -0.04 8975.00 71.91 71.96 -0.05 342.16 342.19 -0.04 9000.00 71.73 71.65 0.08 342.13 342.06 0.07 9025.00 71.63 71.68 -0.06 341.67 341.72 -0.05 9050.00 71.12 71.18 -0.06 341.69 341.71 -0.02 9075.00 71.33 71.45 -0.11 341.88 341.92 -0.03 9100.00 71.67 71.75 -0.08 341.91 341.95 -0.04 9125.00 72.07 72.15 -0.08 341.94 342.01 -0.07 9150.00 72.42 72.47 -0.05 342.12 342.15 -0.03 9175.00 72.00 72.09 -0.08 342.17 342.20 -0.04 9200.00 72.24 72.35 -0.11 342.07 342.17 -0.10 9225.00 72.41 72.48 -0.07 342.35 342.39 -0.04 9250.00 72.48 72.52 -0.04 342.45 342.47 -0.03 9275.00 72.63 72.70 -0.07 342.43 342.46 -0.03 9300.00 72.47 72.58 -0.12 342.72 342.77 -0.05 9325.00 72.10 72.19 -0.09 342.93 343.00 -0.07 9350.00 71.83 71.88 -0.05 343.18 343.26 -0.07 9375.00 71.88 71.92 -0.05 343.40 343.44 -0.04 9400.00 71.96 72.07 -0.11 343.60 343.62 -0.02 9425.00 72.19 72.30 -0.11 344.15 344.15 0.00 9450.00 71.62 71.74 -0.12 343.99 344.08 -0.10 9475.00 71.75 71.82 -0.07 344.38 344.45 -0.08 9500.00 72.04 72.12 -0.08 344.82 344.87 -0.05 9525.00 72.26 72.42 -0.16 345.25 345.26 -0.01 9550.00 72.37 72.52 -0.16 345.38 345.40 -0.02 9575.00 72.76 72.87 -0.11 345.53 345.56 -0.03 9600.00 73.17 73.26 -0.10 345.88 345.85 0.03 9625.00 73.43 73.66 -0.23 346.00 346.05 -0.05 9650.00 73.29 73.40 -0.11 346.00 346.02 -0.02 9675.00 73.36 73.50 -0.14 345.58 345.58 0.00 9700.00 72.84 72.95 -0.11 345.58 345.59 -0.01 9725.00 73.15 73.27 -0.11 345.49 345.49 -0.00 9750.00 73.29 73.41 -0.12 345.27 345.27 0.00 9775.00 72.68 72.94 -0.26 344.90 344.94 -0.04 9800.00 72.85 73.04 -0.19 344.54 344.55 -0.01 9825.00 72.44 72.52 -0.08 344.36 344.35 0.02 9850.00 72.81 72.94 -0.13 344.27 344.26 0.01 9875.00 72.97 73.01 -0.04 344.11 344.14 -0.03 9900.00 72.38 72.58 -0.21 343.91 343.96 -0.04 9925.00 72.59 72.76 -0.16 343.69 343.69 -0.01 9950.00 71.99 72.06 -0.07 343.61 343.61 -0.00 9975.00 72.08 72.15 -0.07 343.45 343.43 0.02 10000.00 72.09 72.21 -0.12 343.17 343.19 -0.02 10025.00 71.68 71.88 -0.20 342.99 343.02 -0.02 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 11 of 15 AK04136CM127 • • . Survey QC - RGS -CT Specification Sheet • • ` • 4, �' 10050.00 72.08 72.22 -0.13 342.96 342.94 0.02 10075.00 72.49 72.64 -0.15 343.50 343.57 -0.07 10100.00 72.67 72.81 -0.14 343.54 343.51 0.03 10125.00 72.84 73.03 -0.20 343.39 343.43 -0.04 10150.00 73.08 73.28 -0.20 343.79 343.86 -0.07 10175.00 73.35 73.52 -0.17 343.99 344.00 -0.01 10200.00 73.41 73.38 0.03 344.48 344.50 -0.03 10225.00 72.93 73.06 -0.13 344.22 344.40 -0.18 10250.00 73.28 73.40 -0.11 344.69 344.73 -0.04 10275.00 72.70 72.86 -0.16 345.42 345.41 0.00 10300.00 73.00 73.19 -0.19 345.24 345.23 0.01 10325.00 72.60 72.66 -0.06 345.15 345.07 0.09 10350.00 72.76 72.81 -0.05 345.01 344.98 0.03 10375.00 72.87 72.97 -0.10 344.62 344.61 0.02 10400.00 72.52 72.72 -0.20 344.31 344.29 0.02 10425.00 72.45 72.60 -0.16 343.90 343.96 -0.05 10450.00 72.27 72.36 -0.09 343.91 343.84 0.07 10475.00 72.46 72.50 -0.04 343.83 343.80 0.03 10500.00 72.40 72.50 -0.11 343.63 343.69 -0.06 10525.00 72.24 72.43 -0.19 344.03 344.09 -0.05 10550.00 72.46 72.63 -0.17 344.26 344.33 -0.07 10575.00 72.76 72.79 -0.04 344.77 344.85 -0.09 10600.00 72.70 72.89 -0.19 345.07 345.04 0.03 10625.00 72.37 72.48 -0.12 344.97 345.02 -0.05 10650.00 72.49 72.66 -0.17 345.12 345.14 -0.01 10675.00 72.20 72.36 -0.16 344.80 344.82 -0.03 10700.00 71.88 71.92 -0.04 345.09 345.11 -0.02 10725.00 72.16 72.24 -0.09 345.44 345.44 -0.00 10750.00 72.40 72.52 -0.11 345.85 345.83 0.02 10775.00 72.04 72.29 -0.25 346.03 346.05 -0.02 10800.00 72.53 72.73 -0.20 346.20 346.28 -0.08 10825.00 72.84 72.97 -0.14 347.02 347.18 -0.16 10850.00 72.65 72.80 -0.15 347.60 347.66 -0.05 10875.00 73.21 73.39 -0.18 347.99 348.02 -0.03 10900.00 73.07 73.29 -0.22 348.83 348.83 -0.00 10925.00 72.92 73.05 -0.13 348.70 348.67 0.03 10950.00 72.79 72.78 0.02 348.82 348.74 0.08 10975.00 72.83 72.90 -0.06 348.61 348.60 0.01 11000.00 72.89 73.09 -0.20 348.46 348.48 -0.02 11025.00 72.55 72.54 0.01 348.31 348.14 0.17 11050.00 72.57 72.72 -0.14 347.98 347.92 0.07 11075.00 72.66 72.52 0.14 347.98 347.97 0.02 11100.00 72.71 72.82 -0.11 347.84 347.80 0.04 11125.00 72.55 72.68 -0.12 347.61 347.58 0.03 11150.00 72.08 72.30 -0.22 347.48 347.47 0.01 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 12 of 15 AK0413GCM127 • • ` Survey QC - RGS -CT Specification Sheet • • ° • 4, • 11175.00 72.15 72.25 -0.10 347.35 347.28 0.07 11200.00 72.48 72.43 0.05 347.24 347.27 -0.03 11225.00 72.27 72.39 -0.12 347.19 347.17 0.01 11250.00 72.23 72.41 -0.18 346.95 346.92 0.03 11275.00 72.10 72.27 -0.17 346.64 346.63 0.01 11300.00 72.16 72.21 -0.05 346.62 346.52 0.09 11325.00 72.42 72.35 0.06 346.52 346.52 -0.00 11350.00 72.25 72.44 -0.19 346.28 346.27 0.01 11375.00 72.17 72.37 -0.20 346.07 346.03 0.04 11400.00 72.13 72.27 -0.15 345.92 345.81 0.11 11425.00 72.26 72.30 -0.04 345.93 345.81 0.12 11450.00 72.53 72.62 -0.09 345.83 345.81 0.02 11475.00 72.43 72.68 -0.25 345.81 345.81 0.00 11500.00 72.73 72.97 -0.24 345.87 345.87 -0.01 11525.00 72.75 72.83 -0.09 345.86 345.75 0.11 11550.00 72.99 72.78 0.21 345.86 345.85 0.01 11575.00 72.82 72.94 -0.12 345.84 345.90 -0.07 11600.00 72.40 72.68 -0.29 346.04 346.11 -0.07 11625.00 72.56 72.40 0.16 346.06 345.94 0.12 11650.00 72.42 71.81 0.61 345.93 346.15 -0.22 11675.00 71.22 71.18 0.04 346.39 346.45 -0.06 11700.00 70.09 70.31 -0.23 346.34 346.33 0.01 11725.00 69.82 70.18 -0.36 346.45 346.41 0.04 11750.00 69.04 69.18 -0.14 346.53 346.54 -0.01 11775.00 68.15 68.13 0.02 347.06 347.11 -0.05 11800.00 67.81 68.02 -0.22 347.42 347.42 0.00 11825.00 67.51 67.86 -0.35 347.42 347.38 0.04 11850.00 67.32 67.73 -0.42 347.29 347.25 0.05 11875.00 67.24 67.57 -0.33 347.12 346.99 0.13 11900.00 67.29 67.29 0.00 347.09 346.96 0.13 11925.00 66.95 67.00 -0.05 346.96 346.97 -0.01 11950.00 65.70 65.82 -0.12 346.67 346.81 -0.14 11975.00 64.53 64.89 -0.36 346.46 346.56 -0.10 12000.00 64.42 64.66 -0.24 346.45 346.42 0.03 12025.00 64.76 65.11 -0.35 346.43 346.42 0.02 12050.00 63.58 63.91 -0.33 345.86 345.84 0.03 12075.00 63.63 63.81 -0.19 345.71 345.69 0.03 12100.00 63.18 63.48 -0.31 345.19 345.15 0.04 12125.00 62.74 62.94 -0.21 344.92 344.77 0.16 12150.00 63.00 63.08 -0.08 344.72 344.59 0.13 12175.00 63.21 63.50 -0.29 344.23 344.12 0.11 12200.00 62.73 62.91 -0.19 343.67 343.67 0.00 12225.00 62.42 62.54 -0.12 343.32 343.17 0.15 12250.00 62.15 62.48 -0.33 342.43 342.36 0.07 SURV -Q167 (OPS SUR -MA -003) 19`" Nov 03 / Rev 15 Page 13 of 15 AK0413GCM127 4 • • . Survey QC - RGS -CT Specification Sheet • a ' ♦ - 1 12275.00 62.28 62.26 0.02 342.02 341.64 0.38 12300.00 61.92 62.22 -0.29 340.89 340.80 0.09 12325.00 61.77 61.98 -0.21 340.21 340.17 0.04 12350.00 61.16 61.46 -0.30 339.02 338.99 0.04 12375.00 60.85 61.08 -0.23 338.48 338.33 0.15 12400.00 60.86 60.86 0.00 337.75 337.57 0.18 12425.00 60.60 60.75 -0.15 336.74 336.67 0.07 12450.00 60.17 60.41 -0.24 335.87 335.83 0.04 12475.00 59.63 59.90 -0.27 334.67 334.73 -0.06 12500.00 59.23 59.41 -0.17 334.56 334.51 0.05 12525.00 59.27 59.16 0.11 334.41 334.47 -0.06 12550.00 59.00 59.06 -0.06 334.16 334.18 -0.03 12575.00 58.49 58.75 -0.27 333.73 333.64 0.09 12600.00 58.08 58.38 -0.30 333.39 333.42 -0.04 12625.00 57.63 57.77 -0.13 333.74 333.90 -0.16 12650.00 57.59 57.55 0.04 333.75 333.81 -0.06 12675.00 57.48 57.60 -0.12 333.44 333.48 -0.04 12700.00 56.84 57.04 -0.20 333.31 333.33 -0.02 12725.00 56.27 56.43 -0.17 333.32 333.34 -0.02 12750.00 55.52 55.60 -0.09 333.08 333.15 -0.07 12775.00 55.29 55.17 0.13 332.97 333.02 -0.05 12800.00 54.51 54.48 0.03 332.46 332.52 -0.07 12825.00 53.43 53.56 -0.13 332.32 332.34 -0.03 12850.00 52.29 52.42 -0.13 332.40 332.47 -0.07 12875.00 51.68 51.77 -0.09 332.39 332.45 -0.06 12900.00 51.70 51.51 0.18 332.59 332.94 -0.35 12925.00 51.75 51.79 -0.04 333.47 333.52 -0.05 12950.00 51.67 51.90 -0.23 334.38 334.37 0.01 12975.00 51.77 52.01 -0.24 335.28 335.24 0.04 13000.00 51.34 51.31 0.03 335.85 336.04 -0.19 13025.00 50.86 50.66 0.20 336.19 336.16 0.03 13050.00 50.20 50.20 -0.00 335.99 335.96 0.02 13075.00 49.27 49.33 -0.05 335.98 335.80 0.17 13100.00 48.47 48.51 -0.04 335.69 335.73 -0.03 13125.00 47.51 47.25 0.26 336.21 336.28 -0.07 13150.00 46.11 45.74 0.37 336.92 337.03 -0.11 13175.00 44.29 44.05 0.24 337.49 337.63 -0.14 13200.00 42.55 42.43 0.13 338.72 338.81 -0.08 13225.00 40.48 40.36 0.12 339.76 339.92 -0.16 13250.00 39.09 38.87 0.23 341.23 341.53 -0.29 13275.00 38.13 37.93 0.21 342.41 342.46 -0.04 13300.00 37.41 37.37 0.04 343.00 342.98 0.01 13325.00 36.92 37.05 -0.13 343.53 343.57 -0.04 13350.00 36.59 36.72 -0.13 344.54 344.56 -0.02 SURV -Q167 (OPS SUR -MA -003) 19`" Nov 03 / Rev 15 Page 14 of 15 AK04136CM127 ■ • 0 , Survey QC - RGS -CT Specification Sheet • * ' • d ." 13375.00 37.25 37.25 0.01 344.97 345.04 -0.07 13400.00 37.04 37.27 -0.23 347.12 347.16 -0.04 13425.00 38.02 37.86 0.16 347.32 347.44 -0.13 13450.00 38.35 38.42 -0.06 347.91 347.98 -0.07 13475.00 38.27 38.19 0.08 348.31 348.65 -0.34 13500.00 37.58 37.34 0.24 349.49 349.66 -0.17 Average - 0.0743 - 0.1618 Standard Deviation 0.1098 0.2042 Tolerance for both the Average and the Standard Casing 0.3 Casing 0.5 Deviation Drillpipe 0.3 Drillpipe 0.75° * Inclination and Azimuth interpolated to same depths as shown. SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 15 of 15 AK0413GCM127 i • • ; Survey QC - RGS -CT Analysis Sheet SURVEY QUALITY CONTROL - DATA ANALYSIS REFERENCE SYSTEMS Grid System I I Grid Correction 1 0.00 I Azimuth reference: Grid / True North TRUE NORTH Vertical reference: RKB /MSL/Other RKB I If other give details TIE ON DATA Depth 0.00 Inclination 0.00 Azimuth 0.00 I ND 1 0.00 Northings 0.00 Eastings 0.00 Latitude 70.5077 Az. Ref: Grid /True True Grid Corrected Y /N? N Description CALIBRATION Tool Number 1 1523 I Calibration Date I 02 May 2012 OPERATING TEMPERATURE Calibration range From 49.66 To 119.83 Gyro operating range From 92.48 To 99.30 I Spec' - Within calibration range FIELD ROLL TEST (Only valid on fixed structures. When not ossible input roll test data performed after return to base) Cal value Pre job offset Post job offset Abs dif.cal.post Abs dif.pre.post Spec' Accel Scale 0.000060 - 0.000322 - 0.000275 0.000275 0.000046 Cal /Post - 0.00015 Mass Unbalance 34.45 -1.06 -1.49 1.49 0.43 Pre /Post - 0.4 ° /hr INITIALISATION Depth (Approx) 1700.00 No of stns 6 Spec' - Min No. - 6 Azimuth Mean 346.30 Std deviation 0.11 Spec' - Azi SD 0.2° Inclination Mean 9.91 Std deviation 0.00 Spec' - Inc SD 0.1° Earth Horizontal Rate Mean (Abs(meas - theor)) 1 0.32 Std deviation 0.02 Spec' - See Q167 DRIFT TUNE Residual x gyro bias Mean 0.000 Std dev' 0.005 Spec's - Mean and SD - 0.333 ° /hr Residual y gyro bias Mean 0.001 Std dev' 0.003 Spec's - Mean and SD - 0.333 ° /hr TOOLFACE RATE Maximum toolface rate 1 339.36 I Spec' - 400° /sec IN /OUT COMPARISON (AZI` N/A IF INC' <15 °) Inclination Difference Mean -0.07 Std dev' 0.11 Spec's - Casing 0.3° /Drill pipe 0.3° Azimuth Difference Mean -0.16 Std dev' 0.20 Spec's - Casing 0.5° /Drill pipe 0.75° Lateral Divergence /1000 1.87 Spec - 5.0/1000 Vertical Divergence /1000 0.98 Spec' - 2.0/1000 DEPTH CONTROL Wireline Company Schlumberger l Line type 7/32" Encoder SF I Schlumberger Max Depth (TD) 13517.9 CCL Corrected NO Zero Depth (Rig up) RKB @ 48.35ft Rezero Depth -22 Given pup joint depth NA Measured P.) NA Strech cor. At TD divided by TD /1000 1.185 Spec' - 1.5/1000 Dif. Between riqup and rezero depths divided by TD /1000 1.629 Spec' - 2.0/1000 Dif. Between given and meas depth divided by meas /1000 NA Spec' - 2.0/1000 SURV -Q165 (OPS SUR -14A -010) 22 Tan 2004 / Revision 20 Page 1 of 1 AK0413GCM127 4 • # ' •`i. Survey QC - RGS -CT Acceptance Sheet FIELD AND SURVEY INFORMATION Operator BP EXPLORATION ALASKA INC Field / Platform WELLHEAD Well Number MILNE POINT DRILLSITE: MPF -PAD WELL: MPF -45 Survey section From 0.0 ft. to 13517.9 ft. Date 4/9/2013 Gyrodata Job No AK0413GCM127 Gyrodata Surveyors Edwin Hardon Job Objective High Accuracy Gyro Survey SURVEY PERFORMANCE In Spec' QC Parameter Yes /No /NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey 'Hot' section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land /fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurvey with backup tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurvey with back up tool. Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investigate and comment if effects are negligible Contact Duty Engineer to discuss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurvey with backup tool Inrun /Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either inrun or outrun meet all other QC parameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV -Q166 (OPS SUR-MA -003) 13 Nov 03 / Revision 12 Page 1 of 1 AK0413GCM127 4 • • by BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 - 6612.; December 30, 2011 Mr. Tom Maunder (� - Q Alaska Oil and Gas Conservation Commission `I 333 West 7 Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of MPF -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPF -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator . • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) MPF -Pad 10/29/2011 Corrosion Initial top of Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement Vol. of cement pumped cement date inhibitor sealant date ft bbls ft gal MPF -01 1950450 50029225520000 10.2 N/A 10.2 N/A 122.4 8/7/2011 MPF -02 1960700 50029226730000 4 N/A 4 N/A 35.7 8/8/2011 MPF -05 1970740 50029227620000 1.3 N/A 1.3 N/A 13.6 8/9/2011 MPF-06 1960020 50029226390000 1.2 N/A 1.2 N/A 15.3 8/2/2011 MPF-09 1971040 50029227730000 5.0 N/A 5.0 N/A 54.4 8/9/2011 MPF -10 1960940 50029226790000 1.7 N/A 1.7 N/A 20.4 8/2/2011 MPF -13 1950270 50029225490000 0.2 N/A 0.2 N/A 8.5 10/6/2011 MPF -14 1952120 50029226360000 0.1 N/A 0.1 N/A 8.5 10/6/2011 MPF -17 1971960 50029228230000 4.1 N/A 4.1 N/A 37.4 8/6/2011 MPF -18 1961000 50029226810000 8.3 N/A 8.3 N/A 91.8 8/2/2011 MPF -21 1961350 50029226940000 1.8 N/A 1.8 N/A 15.3 8/6/2011 MPF -22 1952010 50029226320000 4 N/A 4 N/A 13.6 8/1/2011 MPF -25 1950160 50029225460000 0.3 N/A 0.3 N/A 6.8 10/29/2011 MPF -26 1970840 50029227670000 1.8 N/A 1.8 N/A 11.9 8/1/2011 MPF -29 1961170 50029226880000 6.7 N/A 6.7 N/A 56.1 8/9/2011 MPF -30 1951840 50029226230000 0.8 N/A 0.8 N/A 6.8 8/1/2011 MPF -33 2010620 50029226890000 23 Need top job MPF -34 1971970 50029228240000 4.1 N/A 4.1 N/A 13.6 8/1/2011 MPF-37 1950250 50029225480000 0.2 N/A 0.2 N/A 8.5 10/6/2011 MPF-38 1951680 50029226140000 0.3 N/A 0.3 N/A 6.8 10/5/2011 MPF-41 1970950 50029227700000 0.8 N/A 0.8 N/A 8.5 8/9/2011 MPF-42 1970200 50029227410000 1.8 N/A 1.8 N/A 13.6 8/1/2011 -----> MPF-45 1950580 50029225560000 8 N/A 8 N/A 78.2 8/11/2011 MPF-46 1940270 50029224500000 Sealed Conductor N/A N/A N/A N/A WA MPF-49 1970030 50029227320000 2.3 N/A 2.3 N/A 18.7 8/11/2011 MPF -50 1970580 50029227560000 1.7 N/A 1.7 N/A 6.8 7/31/2011 MPF -53 1951080 50029225780000 2.8 N/A 2.8 N/A 11.9 9/19/2011 MPF -54 1961920 50029227260000 1.7 N/A 1.7 N/A 10.2 8/1/2011 MPF -57A 2031670 50029227470100 1.3 N/A 1.3 N/A 13.6 8/11/2011 MPF -58 1961560 50029227060000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF-61 1951170 50029225820000 62 Need top job MPF -62 1951610 50029226090000 2.0 NN 2.0 N/A 13.6 9/1/2011 MPF-65 1970490 50029227520000 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF -66A 1961620 50029226970100 0.8 N/A 0.8 N/A 8.5 7/31/2011 MPF -69 1951250 50029225860000 0.8 N/A 0.8 N/A 8.5 8/4/2011 MPF -70 1951530 50029226030000 1.7 N/A 1.7 N/A 15.3 7/31/2011 MPF -73A 2001980 50029227440100 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF -74 1961080 50029226820000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF -77 1951360 50029225940000 0.2 N/A 0.2 N/A 6.8 10/5/2011 MPF -78 1951440 50029225990000 0.7 N/A 0.7 N/A 5.1 7/31/2011 MPF -79 1971800 50029228130000 0.6 N/A 0.6 N/A 6.8 8/3/2011 MPF -80 1982170 50029229280000 0.5 N/A 0.5 N/A 3.4 8/3/2011 MPF -81 2000660 50029229590000 0.9 N/A 0.9 N/A 8.5 8/3/2011 MPF-82 2091350 50029229710000 1.7 N/A 1.7 N/A 15.3 8/3/2011 MPF-83 2000930 50029229630000 1.2 N/A 1.2 N/A 13.6 8/3/2011 MPF -84B 2001760 50029229310200 1.2 N/A 1.2 N/A 10.2 8/3/2011 MPF-85 1982500 50029229360000 0.1 N/A 0.1 N/A 7.7 9/1/2011 MPF -86 2010870 50029230180000 0.8 N/A 0.8 N/A 6.8 8/12/2011 MPF -87A 2032130 50029231840100 1.3 N/A 1.3 N/A 11.9 8/13/2011 MPF -88 2031930 50029231850000 1.3 N/A 1.3 N/A 15.3 8/3/2011 MPF-89 2050900 50029232680000 1.2 N/A 1.2 N/A 10.2 8/3/2011 MPF -90 2012110 50029230510000 1.8 N/A 1.8 N/A 18.7 8/3/2011 MPF -91 2051100 50029232710000 1.7 N/A 1.7 N/A 11.9 8/13/2011 MPF -92 1981930 50029229240000 0.8 N/A 0.8 N/A 5.1 8/13/2011 MPF -93 2050870 50029232660000 0.3 N/A 0.3 N/A 7.7 9/1/2011 MPF -94 2011700 50029230400000 1.8 N/A 1.8 N/A 13.6 8/13/2011 MPF -95 1981790 50029229180000 0.5 N/A 0.5 N/A 3.4 8/13/2011 MPF -96 2081860 50029234060000 0.1 N/A 0.1 N/A 6.0 9/1/2011 MPF -99 2061560 50029233320000 1.3 N/A 1.3 N/A 11.9 8/11/2011 I STATE OF ALASKA . ALA OIL AND GAS CONSERVATION COM ION REPORT OF SUNDRY WELL OPERATIONS RECEIVED JUL 1 9 2006 ^i""¡',, nil R.. r.",(! rnn!: Commissi 1. Operations Performed: ..- Anchora~e o Abandon ~ Repair Well o Plug Perforations o Stimulate ORe-Enter Suspen ed Well o Alter Casing ~ Pull Tubing o Perforate New Pool o Waiver ~ Other o Change Approved Program o Operation Shutdown o Perforate o Time Extension Change Out ESP 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. 181 Development o Exploratory 195-058 3. Address: o Stratigraphic o Service 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029·22556-00 7. KB Elevation (ft): KBE = 46' 9. Well Name and Number: MPF-45 8. Property Designation: 10. Field / Pool(s): ADL 355018 Milne Point Unit / Kuparuk River Sands 11. Present well condition summary Total depth: measured 14220 . feet true vertical 7502. feet Plugs (measured) None Effective depth: measured 14107 feet Junk (measured) None true vertical 7414 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 76' 20" 110' 110' Surface 6645' 9-5/8" 6678' 4381' 5750 3090 Intermediate Production 14159' 7" 14191' 7480' 7240 5410 Liner '.~ F<N·~v;.¡tj .' l:,~ "".~!AJ, ". ,,~.-. Perforation Depth MD (ft): 13781' - 13865' \.i'liii' . Perforation Depth TVD (ft): 7152' - 7221' 2-7/8",6.5# L-80 13605' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): None 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: 13. Representative Daily AveraQe Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure TubinQ Pressure Prior to well operation: 174 39 124 390 358 Subsequent to operation: 0 0 0 100 0 14. Attachments: o Copies of Logs and Surveys run 15. Well Class after proposed work: 181 Daily Report of Well Operations o Exploratory 181 Development o Service 16. Well Status after proposed work: ~ Well Schematic Diagram 181 Oil ' 0 Gas o WAG DGINJ DWINJ o WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUndry Number or N/A if C.O. Exempt: Contact David Reem, 564-5743 Printed Name Sondra Stewman Title Technical Assistant :i~'~ Prepared By Name/Number: . ;~ Dateül-ll-0<Osondra Stewman, 564-4750 SI nature /)ærY~ J ø) r¡""'V\_ Phone 564-4750 Form 10-404 Revised 04/2<5oõ"-"-- RBDMS BFL AUG 0 9 Z006 Submit riginal Only on l\iN191èlO ~l~ ~ 7'~ .0(- ~l'/"I/t?... Tree: Cameron 2 9/16" MPU F _ 45 Wellhead: 11" 5M FMC Gen 5 w/ " x 11" tubing hng. w/ 2 7/8" 8 rd EUE connections top and bottom. and 2.5" 'H' style BPV profile. 20",91.1 ppf, NT80LHE I 113' I 95/8",40 ppf., L-80 Btrc. 6678' md I 7" 26 ppf, L-80, NSCC production casing (drift ID = 6.151", cap. = 0.0383 bpf) 2 7/8" 6.5 ppf, L-80, 8 rd EUE tbg.. ( drift ID = 2.347", cap. = 0.00592 bpf) KOP @ 1100' Max. hole angle = 73 Deg. f/4500' - 11,700 Hole angle through perf interval = 36 deg. Stimulation Summary 9/23/95 - 147 M Ibs. 16/20 Carbo lite @ 40 bpm - no screen out. Perforation Summary Ref loa: 08/19/95 GRlCCL Size SPF Interval (TV D) 3.375" 6 13781' -13865' (7152' -7220') Mid-perf = 7186' TVD 13823' MD 22 gm. Jumbo Jet ("big hole" ) charges @ 60 deg. phasing, random orientation. EHD = 0.76" , TIP = 6.4" Orig. KB elev. = 48.35' (N 27E) Orig. GL eJev. = 13.40' RT To Tbg. Spool = 32.46' (N 27E) Cameo 2 7/8" x 1" KBMM GLM 134' Cameo 2 7/8" x 1" KBMM GLM I 13,367' I 2-7/8" HES XN-Nipple I 13,486' I 2.25" min. id GPMTAR 1:1 I 13,529' I 65 GC2200 1122 GC 2200 Tandem Gas Separator I 13,561' I GRSFTXARH6 Tandem Seal Section, I 13,566' I GSB3DBUT AS/HSNPFSA GSB3DBL T AB/HSNFSACL5 Motor, 228 KMH, 2305 volt, I 13,580' I 60 amp, 562 series. PumpMate w/6 fin I 13,605' I Centralizer 7" x 21' Short Joint f/13593' - 13,614' 7" Float Collar ( PBTD ) 7" Casing Shoe 7346' TVD I 14,107' I I 14,192' I DATE REV. BY COMMENTS MILNE POINT UNIT 09/14/95 JBF D&C by N27e WELL F-45 01/19/96 JBF ESP Completion Installed by N 4ES API NO: 50-029-22556 10/13/00 GMH ESP RWO 4-es /4/11/04/ 6/17/06 MDO ESP RWO 4-ES BP EXPLORATION AK Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPF·45 MPF-45 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES Start: 6/16/2006 Rjg Release: 6/19/2006 Rig Number: 4ES Spud Date: 7/8/1995 End: 6/19/2006 6/16/2006 11 :00 - 12:30 1.50 RIGD P PRE Scope down & lower derrick. 12:30 - 13:30 1.00 MOB P PRE Move camp, pipe shed, rig sub & pits from L Pad To F Pad. 13:30 - 14:30 1.00 MOB P PRE Layout Herculite & Spot Rig Sub over MPF-45. Spot in camp, pits & pipe shed. RlU equip. 14:30 - 16:00 1.50 MOB P PRE Raise & scope up derrick. RlU equip. 16:00 - 17:00 1.00 WHSUR P DECOMP ACCEPTED RIG @ 1600 hrs.... P/U lubricator & pull BPV. UD lubricator. 17:00 - 18:00 1.00 RIGU P DECOMP RlU lines to tiger tank & X-mas tree for kill operation. RlU 2X annular valves. Finish rigging up equip. 18:00 - 20:00 2.00 KILL P DECOMP Take on 120 degree seawater for kill operation. Hold Pre-Spud & PJSM. 20:00 - 23:30 3.50 KILL P DECOMP Test lines to 3500 psi. Open well. SITP = 670 psi. SICP = 700 psi. Blew well down to 520 TP & 20 CPo Kill well as follows: Pumped 530 bbls of 120 degree seawater, 4 BPM @ 1380 psi. Caught fluid @ 340 stks (20 bbls) est. FL @ 3450'. Finished pumping, SID & monitor well. Tbg pressure dropped to 0 psi. & CP dropped to 20 psi & was gassy. Bullheaded 50 bbls of seawater down annulus @ 4BPM, 120 psi. SID both tubing & annulus were on a vacuum. Recovered 290 bbls of 85% oil. Well dead. 23:30 - 00:00 0.50 WHSUR P OECOMP Set TWC. Test same to 3500 psi, Ok. Blow down & RID lines. 6/17/2006 00:00 - 01 :00 1.00 WHSUR P DECOMP Bleed off hanger void & N/D X-mas tree. 01 :00 - 04:00 3.00 BOPSU P DECOMP N/U BOPE. 04:00 - 08:00 4.00 BOPSU P DECOMP Test BOPE as per BP/AOGCC requirements. LP 250 psi, HP 3500 psi. BOP test witnessing waived by John Spaulding wI AOGCC. Rig down test equipment. 08:00 - 09:00 1.00 WHSUR P DECOMP Pick-up Lubricator and pull TWC. Lay down same. Well on vacuum. 09:00 - 12:30 3.50 PULL N WAIT DECOMP Wait on ESP Spooling Unit and Centrilift Tech to finish running Completion in progress on Rig 3. 12:30 - 13:00 0.50 PULL P DECOMP Spot and rig-up ESP Spooling Unit. 13:00 - 13:30 0.50 PULL P DECOMP Pick-up Landing Joint. BOLDS. Pull Tubing Hanger to Floor with no problems. ( 97K). 13:30 - 17:00 3.50 PULL P DECOMP Trip out with 2 7/8" ESP Completion 17:00 - 18:30 1.50 PULL P DECOMP Change out ESP cable spools. 18:30 - 23:00 4.50 PULL P DECOMP Con't to POOH w/2 7/8" ESP completion. Stand back tubing. 23:00 - 00:00 1.00 PULL P DECOMP Drain & break down ESP. Inspect same. 6/18/2006 00:00 - 01 :30 1.50 PULL P OECOMP Break down & inspect ESP. Recovered an egg shaped piece of lead on top of ESP. No damage noted to ESP. 01 :30 - 03:00 1.50 RUNCMP Clear & clean rig floor.Crate up old ESP & Unpack new ESP 03:00 - 07:00 4.00 RUNCMP P/U assemble & service new ESP. Plug in cable & check same. 07:00 - 10:30 RUNCMP Bigin running 2 7/8" ESP Completion. Stop for splice. 10:30 - 15:00 RUNCMP Centrilift make reel to reel cable splice. (Nabors cut and slip Drilling Line and hold weekly Safety Meeting during cable splice) 15:00 - 18:30 RUNCMP Resume running 2 7/8" ESP Completion. Ran total of 427 jts 2 7/8" tubing. Top of pump @ 13529'. "XN" Nipple @ 13486'. GLM wI Dummy @ 13367'. GLM wi DSOV @ 134'. Used: 3 Flat Guards; 6 Protectolizers, 216 LaSalle Clamps. 18:30 - 19:00 RUNCMP MIU landing jt & hanger. Install penetrator.. Printed: 6/20/2006 12: 16:48 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPF-45 MPF-45 WORKOVER NABORS ALASKA DRILLING J NABORS 4ES Start: 6/16/2006 Rig Release: 6/19/2006 Rig Number: 4ES Spud Date: 7/8/1995 End: 6/19/2006 6/19/2006 21 :00 - 22:30 22:30 - 01 :00 00:00 - 00:30 1.50 BOPSU P 2.50 WHSUR P 0.50 WHSUR P Make final field splice & plug into penetrator. Test same. Land hanger & RILDS. UD landing jt. P/U Wt = 9Ok. SIO wt = 39k. RUNCMP N/D BOPE. RUNCMP N/U X-mas tree. RUNCMP Finish N/U X-mas tree. Test tree & hanger void to 5000 psi, Ok. Perform final ESP Cable check. Good. ,/ 00:30 - 01 :00 0.50 WHSUR P RUNCMP P/U lubricator pull TWC. Install BPV & UD Lubricator. Clean cellar. Secure well. RELEASE RIG @ 0100 hrs, 6/19/2006 Printed: 6/20/2006 12:16:48 PM r'" STATE OF ALASKA ~ ALASKA _IL AND GAS CONSERVATION COhllv1ISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: 0 Abandon 0 Alter Casing 0 Change Approved Program 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 7. KB Elevation (ft): KBE = 46' 0 Operation Shutdown 0 Perforate 0 Plug Perforations 0 Stimulate 0 Perforate New Pool 0 Re-Enter Suspended Well 4. Current Well Class: 181 Development 0 Exploratory 0 Stratigraphic Test 0 Service 0 Waiver 1m Other 0 Time Extension Change Out ESP 0 Annular Disposal 5. Permit To Drill Number 195-058 6. API Number: 50-029-22556-00 0 Suspend 1m Repair Well 1m Pull Tubing 8. Property Designation: ADL 355018 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor 76' Surface Intermediate Production 14159' Liner 14220 7502 14107 7414 Perforation Depth MD (ft): Perforation Depth TVD (ft): feet feet Plugs (measured) None feet Junk (measured) None feet Size MD TVD 20" 110' 110' 7" 14191' 7480' 13781' - 13865' 7152' - 7221' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 12. Stimulation or cement squeeze summary: Intervals treated (measured): 9. Well Name and Number: MPF-45 10. Field / Pool(s): Milne Point Unit / Kuparuk River Sands Burst Collapse 7240 5410 2-7/8",6.5# L-80 13585' None RECI=IVED MAY 1 4 2004 Alaska Oil & Gas Cons Com' . . mISSIon Anchorage Treatment description including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: 0 Copies of Logs and Surveys run 181 Daily Report of Well Operations 181 Well Schematic Diagram Oil-Bbl Representative Daily Average Production or Injection Data Gas-Met Water-Bbl CasinQ Pressure TubinQ Pressure 15. Well Class after proposed work: 0 Exploratory 181 Development 0 Service 16. Well Status after proposed work: 181 Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. I Sundry Number or N/A if C.O. Exempt: Contact David Reem, 564-5743 Printed Name Sondra Stewman Si~~ -,=..l(~ ~ .~ Form 10-404Revised 12/2003 Title Technical Assistant a !<rc , N11:t c . / I Prepared By Name/Number' Date O~""I"'i..-cJ-Isondra Stewman, 564-4750 RBDMS BFL MAY! ¡¡ ï ìùU4 r', ~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPF-45 MPF-45 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES Start: 4/10/2004 Rig Release: 4/12/2004 Rig Number: 4ES Spud Date: 7/8/1995 End: 4/12/2004 4/10/2004 00:00 - 03:00 3.00 MOB P PRE Complete move from Sag Delta 2A (68.5 mile move). MIRU on MPF-45. 03:00 - 06:00 3.00 RIGU P PRE RIG ACCEPTED @ 03:00 hrs. Continue spotting up support equip. Start taking on heated seawater to the pits. NOTE: 38-hrs between rig release at Sag Delta 2A and rig accept at MPF-45. 06:00 - 06:30 0.50 RIGU P PRE Hold mini-ATP with MPU Ops Supv and both crews. 06:30 - 12:30 6.00 KILL P DECOMP Hook up and test lines to 3500 psi. Pull BPV. SITP = 1190 psi, SICP = 1140 psi. Bleed off SITP to 150 psi. Circ 80 bbls heated SW to pump, close in returns and bullhead 30 bbls heated SW into formation. Tubing pressure falling off to 30 psi @ 2bpm. Open up casing returns and bleed off pressure thru choke to tiger tank. Well siphoned off 70 bbls from pit before pump's suction valve was closed. 12:30 - 14:30 2.00 KILL P DECOMP Start pumping down the casing wlhot seawater at 5-6 bpm. Pump 100 bbls, final pressure less than 200 psi. Tubing pressure remained at 0 psi while pumping down casing. SD & monitor well. Casing built to 80 psi. 14:30 - 15:45 1.25 KILL P DECOMP Pump 300 bbls heated seawater down the casing at 6 bpm. Tubing open to tiger tank. Starting pump press = 80 psi, final pressure = 430 psi. Tubing remained zero throughout. SD pump, casing pressure fell off rapidly to zero. Shut-in well for 15-min to monitor. 15:45 - 16:00 0.25 KILL P DECOMP Casing on vacuum, tubing at 0 psi. 16:00 - 17:30 1.50 WHSUR P DECOMP RID Surface lines. Install TWC and test to 1500 psi. ND tree. 17:30 - 19:00 1.50 WHSUR P DECOMP RID HCR valve. Function test BOPE. 19:00 - 22:30 3.50 WHSUR P DECOMP N/U BOPE. Clean cement from lower pipe ram doors. 22:30 - 00:00 1.50 WHSUR P DECOMP Begin BOPE pressure testing, witnessed by John Spaulding, AOGCC inspector. 4/11/2004 00:00 - 02:00 2.00 WHSUR P DECOMP Complete pressure test for BOPE to 250 13500 psi. Test witnessed and accepted by AOGCC rep, John Spaulding. 02:00 - 03:00 1.00 WHSUR P DECOMP Drain BOPE, M/U ex! and lubricator, pull and UD TWC. 03:00 - 04:00 1.00 PULL P DECOMP BOLDS, M/U landing it, pull hanger wI 105K and prepare equipment to pull and SIB completion. 04:00 - 04:30 0.50 PULL P DECOMP UD hanger and landing it. RlU to circulate 80 Bbls down tbg (no returns) 04:30 - 06:00 1.50 PULL P DECOMP Begin TOH and SIB 142 stds + 1 jt2-7/8", L-80, EUE 8 rd tubing and UD ESP. 06:00 - 15:00 9.00 PULL P DECOMP Continue POH with completion. Pump 5 bbls heated SW down well every 5 stands. 15:00 - 19:30 4.50 RUNCOIvP CaMP MU new ESP assembly and service; pull cable over sheave. 19:30 - 20:30 1.00 RUNCOIvP CaMP Attached MLE to motor and secure to pump assy. 20:30 - 00:00 3.50 RUNCOIvP CaMP RIH wI ESP and 142 stds + 1 it 2-7/8", L-80, EUE 8 rd tbg from derrick. 4/12/2004 00:00 - 00:30 0.50 RUNCOIvP CaMP RIH wI ESP completion and 2-7/8", L-80, EUE 8 rd tubing. 00:30 - 04:00 3.50 RUNCOIvP CaMP M/U reel-to-reel splice @ 7750'. Clean rig floor, flush pump wI 8 Bbls seawater. 04:00 - 08:30 4.50 RUNCOIvP CaMP Continue RIH wI ESP completion. Cable megged every 2000'. 08:30 - 10:30 2.00 RUNCOIvP CaMP Make-up field splice to tubing hanger & test. 10:30 - 11 :30 1.00 RUNCOIvP CaMP Land tubing hanger. RILDS. 11 :30 - 13:00 1.50 RUNCOIvP CaMP ND BOP. 13:00 - 17:00 4.00 RUNCOIvP CaMP NU tree and test to 5000 psi. NOTE: Had to pull and service rusted API ring on adapter flange. Pull TWC. Install BPV. PnnteC1. 4/19/,004 1,,09,44 PM f". ~, ~. . . . RATI.()N>' .'" ',', . .'m.;".,""'a,7¡~",:,\""""",,."'"',m._"""'",,,,.,.,,.,'"',A,,',,, ".'p,." ,.,',W,'ìii+,'"',',.,',',',',,'., " . r'T',.~., VI~, Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPF-45 MPF-45 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES Start: 4/10/2004 Rig Release: 4/12/2004 Rig Number: 4ES Spud Date: 7/8/1995 End: 4/12/2004 4/12/2004 17:00 - 18:00 1.00 RIGD P POST Secure well and cellar. RDMO. RIG RELEASED @ 1800. Move rig to MPF-69. Pnnted, 4/19/2004 12.09:44 PM r Tree: Cameron 2 9/1b ...M Wellhead: 11" 5M FMC Gen 5 wI 7" x 11" tubing hng. wI 2 7/S" S rd EUE connections top and bottom. and 2.5" 'H' style BPV profile. 20",91.1 ppf, NT80LHE I 113' I 9 5/S", 40 ppf., L-80 Btrc. 1 667S' md I .. 7" 26 ppf, L-80, NSCC production casing ( drift ID = 6,151 ", cap. :::; 0.0383 bpf ) 2 7/S" 6.5 ppf, L-SO, 8 rd EUE tbg.. ( drift ID = 2.347", cap. :::; 0.00592 bpf) KOP @ 1100' Max. hole angle = 73 Deg. fl 4500' - 11,700 Hole angle through perf interval = 36 deg. Stimulation Summary 9/23/95 - 147 M Ibs. 16 120 Carbolite @ 40 bpm - no screen out. Perforation Summary Ref log: 08/19/95 GRlCCL Size SPF Interval (TVD) 3.375" 13781' -13865' (7152' -7220') 6 Mid-perf = 7186' TVD 13823' MD 22 gm. Jumbo Jet ("big hole" ) charges @ 60 deg. phasing, random orientation. EHD = 0.76" ,TTP = 6.4" MPU F -45 ~ ~ / ~ / ~ ~ ~ ~ ~ ~ / ~ / / / ~ ~ ~ ~ ~ / ~ ~ / :- ,. :- / : ~ ~ ~ / /., ~ =- ~ 'N.MVl'{/NNl'{ "-...,, Orig. KB elev. = 48.35' (N 27E) Orig. GL elev. = 13.40' RT To Tbg. Spool = 32.46' (N 27E) Cameo 2 7/8" x 1" KBMM GLM I 134' Camco 2 7/8" x 1" KBMM GLM 113,367' 2-7/8" HES XN-Nipple I 13,486 I 2,25" min. id I 13,529' I Pump, 159 st9. GC1150 I TVD 6948' I GPMTAR 1:1 Tandem Gas Separator l 13,547' I GRSFTXAR Tandem Seal SectIon, I 13,552' I GSB3DBUTILH6PFS GSB3DBLTti6 Motor. 152 KMH, 2325 volt, I 13,566' I 40 amp, 562 series. PumpMate w/6 fin l 13,580' I Centralizer 7" x 21' Short JOInt fl 13593' - 13,614' 7" Float Collar ( PBTD ) 7" Casing Shoe 7346' TVD I 14,107' I 14,192' DATE REV, BY COMMENTS MILNE POINT UNIT 09/14/95 - JBF D&C by N27e WELL F-45 01119196 JBF ESP Completion Installed by N 4ES API NO: 50-029-22556 10/13/00~ GMH ESP RWO Nabors 4ES .- 4/11/04 ESP RWO 4-ES -- MOO BP EXPLORATION (AK) -- -, = STATE OF ALASKA -- ALASt'~-~ .... AND GAS CONSERVATION COlt .... ~ON ~,_r,.,rZT OF SUNDRY WELL OPERATIOr~ 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other Change Out ESP 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. [] Development KBE = 46' [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Milne Point Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Well Number 1979' NSL, 2607' WEL, SEC. 06, T13N, R10E, UM MPF-45 At top of productive interval 9. Permit Number / Approval No. , 195-058 1312' NSL, 64' WEL, SEC. 25, T14N, R09E, UM 10. APl Number At effective depth 50-029-22556-00 1507' NSL, 66' WEL, SEC. 25, T14N, R09E, UM 11. Field and Pool At total depth Milne Point Unit / Kuparuk River 1577' NSL, 67' WEL, SEC. 25, T14N, R09E, UM Sands 12. Present well condition summary Total depth: measured 14220 feet Plugs (measured) true vertical 7502 feet Effective depth: measured 14107 feet Junk (measured) true vertical 7414 feet Casing Length Size Cemented MD TVD Structural Conductor 76' 20" 250 sx Arcticset I (Approx.) 110' 110' Surface 6645' 9-5/8" 1300 sx PF 'E', 250 SX 'G', 250 sx PF 'E' 6678' 4381' Intermediate Production 14159' 7" 225 sx Class 'G' 14191' 7480' Liner Perforation depth: measured 13781' - 13865' RECEIVED - . true vertical 7152' 7221' i '.,, Tubing (size, grade, and measured depth) 2-7/8", 6.5#, L-80, 8rd EUE to 13570' :~..;::,:~ka 0il & G~-*.,s 604'1s. Packers and SSSV (type and measured depth) None :.~ 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Attachments 16. Status of well classifications as: [] Copies of Logs and Surveys run [] Daily Report of Well Operations [] Oil [] Gas [] Suspended Service 17. I hereby certify that the fore, tieing is true and correct to the best of my knowledge Signed TerdeHubble ~A.~-~ ~lr~ Title TechnicalAssistant Date Prepared By Name/Number: Terrie Hubble, 564-4628 Submit In Duplicate~~ Form 10-404 Rev. 06/15/88 'D upe ratto ns Mm ma ry p ort -.~,~j~ Legal Well Name: MPF-45 Common Well Name: MPF-45 8pud Date: 7181~995 Event Name: REPAIR 8ta~: ~ 0~8~2000 End: Contractor Name: NABOR8 Rig Release: Group: RIG Rig Name: NABOR8 4E8 Rig Number: 4E8 ~at~ ::: ~ro~]~6 ]~rs ~S~::~u~: phase ~ ~ : Description of Operations 1011012000 00:00 - 09:00 9.00 RIGU PRE MOVE ON & RIG UP. MOVED FROM MPL-07 TO MPF-45. ACCEPTED RIG ~ 0900 HRS. 09:00 - 11:00 2.00 RIGU PRE SPOT AND BERM TIGER TANK. HOOK UP TO KILL WELL 11:00 - 12:00 1.00 RIGU PRE PULL BPV W/LUBRICATOR & TEST LINES TO 2500 PSI ISIP 300PSI ON TUBING AND 350 PSI ON ANNULUS. IFL3,850' TUBING AND 4,455' ANNULUS 12:00 - 15:30 3.50 RIGU PRE CIRCUITED 170 BBLS OF SEAWATER DoWN TUBING. WITH FOP =3000 PSI ~ 2 BBL./MIN SHOT FLUID LEVEL TO FIND FLUID AT 2035'. PUMPED 150 BBLS. OF SEAWATER DOWN THE ANNULUS AND COULD NOT CATCH PRESSURE. SHUT DOWN AND MONITORED WELL. WELL ON VACUUM ON TUBING AND ANNULUS. 15:30 - 16:00 0.50 RIGU PRE SET ~C AND TESTED TO 5000 PSI FORM TOP 16:00 - 17:00 1.00 WHSUR DEGOMP NIPPLE DOWN TREE 17:00 - 22:00 5.00 BOPSUF DECOMP BOP WOULD NOT CLEAR TEST SPOOL BOLTS / REMOVED TEST SPOOL AND NU BOPE 22:00 - 23:00 1.00 BOPSUF DECOMP ClRCU~TE BOP EQUIPMENT AND A~EMPT TO TEST 23:00 - 00:00 1.00 BOPSUF DECOMP PUMP OUT STACK AND NIPPLE DOWN BLIND/SHEAR ~MS 10/1112000 00:00 - 01:30 1.50 BOPSUF DECOMP NU BLIND ~M AND INSPECT 01:30 - 04:00 2.50 BOPSU~ DECOMP TEST BOP'S 250~3500 PSI 04:00 - 05:30 1.50 BOPSUF DEOOMP RDTEST EQUIP MU LUBRICATOR AND PULL ~C-RD SAME 05:30 - 06:00 0.50 PULL DECOMP MU ~NDING JT AND SHOOT FLUID LEVEL Fluid at 3,200' 06:00 - 07:00 1.00 PULL DECOMP Pulled hnager to the rig floorPick up weight ~ 15 k to move pipe wieght dropped off to 105 K. BREAK OUT HANGER AND TIE ESP CABLE OFF TO SPOOLER 07:00 - 16:30 9.50 PULL DECOMP PULLED OUT OF THE HOLE WITH ESP. PUMPED DOUBLE DISP~CEMENT OF TUBING WHILEPULLING OUT OF THE HOLE. SHOT FLUID LEVELS WHILE PULLING OUT OF THE HOLE WITH FLUID LEVEL STABILIZED AT 3,190'. CHECKED FLUID LEVEL EVERY 25 STANDS WHILE COMING OUT. 16:30 - 18:00 1.50 PULL DECOMP ~BR~K OUT AND ~Y DOWN ESP 18:00 - 20:00 2.00 RUNCO~ COMP RIG UP TO RUN ESP COMPLETION. ESTABLISHED SAFE CLOSING PRESSURE ON ANNU~R AND HELP PJSM FOR RUNNING ESP 20:00 - 22:00 2.00 RUNCOAI COMP PICK UP ESP AND MAKE UP ESP ASSEMBLY-SERVICE AND C~MP CABLE 22:00 - 00:00 2.00 RUNCOA COMP TRIP IN THE HOLE TO 3,400'-MEG PUMP 1011212000 00:00 - 03:30 3.50 RUNOOA COMP RIHTO 4800' AND MEG PUMP SHOOT FL ~3190'. CONTINUE TO RUN IN THE HOLE TO 6700', MEG PUMP 600 PSI, SHOOT FLUID LEVEL 3025' .TIH TO 7,500' 03:30 - 07:00 3.50 RUNCOA COMP SPLICE ESP CABLE, TESTED OK 07:00 - 11:30 4.50 RUNCOA COMP RIH WITH ESP COMPLETION TO 13,570', MAKE UP HANGER AND ~NDING JOINT. STRING PICKUP WEIGHT 98 K AND STRING S~CK OFF WEIGHT 40 K. 11:30 - 13:00 1.50 RUNCO~ COMP SPLICE ON HANGER CONNECTOR AND TEST. TESTED OK 13:00 - 15:00 2.00 BOPSUF COMP ~ND, LOCK DOWN HANGER, SET ~CV AND TEST TO 2,500 PSI. BLEW DOWN LINES AND NIPPLED DOWN BOPE. 115:00- 16:00 1.00 WHSUR COMP NIPPLE UP TREE AND TEST HANGER, S~LS AND BODY TO 5000 PSI. OK 16:00- 18:00 2.00 WHSUR COMP PICKED UP LUBRICATOR AND PULLED ~CV, SET BPV ~Y DOWN LUBRICATOR. FINAL CHECK ESP AND SECURE WELL Printed: 11/1/2000 1:00:52 PM 0Peraii°ns summary Report Legal Well Name: MPF-45 Common Well Name: MPF-45 Spud Date: 7/8/1995 Event Name: REPAIR Start: 10~8~2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: 4ES :: D~t~: :Fro~;~O!:H6u~s :Sask :cSoUdbe phas~ iii : DescriptJon of Operations 10/12/2000 16:00 - 18:00 2.00 WHSUR COMP RIG RELEASED AT 18:00 10-12-2000 Rig down and moved from MPU F-45 to MPU C-14 RECEIVED (..'uu.P Printed: 1111/2000 1:00:52 PM ~ALASKA~ eared rvices rilling BP Exploration / Arco To: Alaska Oil & Gas Conservation Commission Date: February 26, 1999 From: Subject: Terrie Hubble Technical Assistant Miscellaneous Surveys Enclosed, in duplicate, are a number of directional surveys that I have come across while clearing out Ms. Campoamor's desk. I have verified that these surveys do not affect the previously calculated TVD's and below surface locations of these wells, so it was not necessary to correct the 10-407's. They are simply being submitted for your records. If they are duplicates, please discard them. Thank you. /tlh Endicott MPI 1-09A/L-21 Milne Point MPC-09 Milne Point MPF-21 Milne Point MPF-37 Milne Point MPF-45 Milne Point MPF-69 Milne Point MPF-79 Permit #97-29 Permit #85-36 Permit #96-135 Permit #96-25 Permit #95-58 Permit #95-125 Permit #97-180 Gyrodata Incorporated RO. Box 79389 Houston, Texas 77279 713/461-3146 Fax: 713/461-0920 July 20, 1995 B.P. Exploraton (Alaska) Inc. Petrotechnical Data Center, MB 3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 Re: F-Pad, Well No: MPF-45, Milne Point, North Slope AK Enclosed please find one (1) original and six (6) copies and one (1) disk of the completed survey of Well #MPF-45 We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the future. Sincerely Operations Manager RS/fec Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data B.P. EX'PLORATION F PAD WELL NUMBER MPF-45 MILNE POINT FIELD, ALASKA Gyro Multishot Survey Of 5.5" drillpipe Survey date · 15 July, 1995 Job number' AK0795G279 SR279.DOC ,,gyro/data CONTENTS JOB NUMBER :AK0795G279 1. DISCUSSION, SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR279.DOC gyro/data I. DISCUSSION, SURVEY CERTIFICATION SHEET SR279.DOC gym/data DISCUSSION JOB NUMBER: AK0795G279 Tool 725 was run in MPF-45 on ATLAS 5/16" Wireline inside 5.5 inch drillpipe. run without problems. The survey was SR279.DOC gyro/data SURVEY CERTIFICATION SHEET JOB NUMBER: AK0795G279 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the Wellsite. Checked by :- ROB SHOUP OPERATIONS ENGINEER SR279.DOC gym/data 2. SURVEY DETAILS SR279.DOC gyro/data SURVEY DETAILS JOB NUMBER: AK0795G279 CLIENT: B.P. EXPLORATION RIG: NABORS 22E LOCATION: MILNE POINT FIELD WELL: MPF-45 LATITUDE: 70.515 N LONGITUDE: 149.5 W SURVEY DATE: 15-July, 1995 SURVEY TYPE : DEPTH REFERENCE: MAX. SURVEY DEPTH: MULTISHOT IN 5.5" drillpipe ROTARY TABLE ELEVATION 46.0 feet 8130' SURVEY TIED ONTO: N/A SURVEY INTERVAL: UTM CO-ORDINATES: 110' to 7510 feet at 100 ft stations. 7560' to 8130 feet at 50 ft. stations. TARGET DIRECTION: 346.08 GRID CORRECTION: CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: STODDARD SR279.DOC gyro/data 3. OUTRUN SURVEY LISTING SR279.DOC A Gyro d a t a D i r e c t i ona i Survey for B. P. EXPLORATION WELL: MPF-45, 5.5" DRILLPIPE Location: F-PAD, MILNE POINT FIELD,ALASKA Job Number: AK0795G279 Run Date: 15-Jul-95 10:58:07 Surveyor: Tom Stoddard Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.515000 deg. N· Sub-sea Correction from Vertical Reference: 46 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 346.080 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro da t a D i r e c t i o n a i Survey B.P.EXPLORATION WELL: MPF-45, 5.5" DRILLPIPE Location: F-PAD, MILNE POINT FIELD,ALASKA Job Number: AK0795G279 MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. '0.0 0.00 0.00 0.0 0.0 -46.0 0.00 0.0 0.0 (0-813© ft.) A GYRO MULTISHOT SURVEY RUN IN 5.5"DRILLPIPE ALL MEASURED DEPTHS REFERENCED TO ORIGINAL R.K.B.OF 46' Page 1 HORIZONTAL COORDINATES feet 0.00 N 0.00 E 110.0 .28 36.85 110.0 .2 64.0 210.0 .08 175.58 210.0 .3 164.0 310.0 .13 163.57 310.0 .1 264.0 410.0 .42 221.80 410.0 -.2 364.0 510.0 .37 164.89 510.0 -.8 464.0 610.0 .59 182.43 610.0 -1.6 564.0 710.0 .95 210.97 710.0 -2.7 664.0 810.0 .67 228.54 810.0 -3.5 764.0 910.0 .75 183.92 910.0 -4.4 864.0 1010.0 .21 318.66 1010.0 -4.9 964.0 1110.0 1.13 321.86 1110.0 -3.8 1064.0 1210.0 2.52 348.30 1209.9 -.7 1163.9 1310.0 3.50 343.49 1309.8 4.5 1263.8 1410.0 5.36 348.18 1409.5 12.2 1363.5 1510.0 7.43 344.12 1508.8 23.4 1462.8 1610.© 8.28 342.61 1607.9 37.0 1561.9 1710.0 9.66 343.17 1706.7 52.6 1660.7 1810.0 10.06 342.88 1805.2 69.7 1759.2 1910.0 10.18 342.79 1903.6 87.2 1857.6 2010.0 11.11 343.19 2001.9 105.7 1955.9 .25 .34 .05 .37 .38 .26 .52 .37 .54 .91 .92 1.59 1.01 1.89 2 .-12 .87 1.38 .40 .12 .93 .3 36.9 .5 42.6 .4 65.1 .3 147.8 .8 181.5 1.6 178.6 2.9 188.1 4.2 197.8 5.3 199.4 5.8' 199.2 5.3 210.0 4.1 245.8 6.1 304.2 12.9 32;7.9 23.7 336.2 37.3 338.8 52.9 340.0 70.0 340.8 87.5 341.2 106.0 341.5 .22 N .16 E .34 N .31 E .16 N .35 E .22 S .14 E .80 S .02 W 1.63 S .04 E 2.86 S .41 W 3.95 S 1.27 W 4.99 S 1.76 W 5.51 S 1.92 W 4.60 S 2.65 W 1.67 S 3.71 W 3.41 N 5.02 W 10.91 N 6.84 W 21.70 N 9.57 W 34.79 N 13.49 W 49.70 N 18.07 W 66.07 N 23.07 W 82.86 N 28.26 W 100.53 N 33.66 W A Gyro da t a D i re c t i ona i Su'rve y B.P.EXPLORATION WELL: MPF-45, 5.5" DRILLPIPE Location: F-PAD, MILNE POINT FIELD,ALASKA Job Number: AK0795G279 MEASURED I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. Page H O R I Z O N T A L COORDINATES feet 2110.0 13.18 343.08 2099.7 126.7 2210.0 16.59 345.82 2196.3 152.4 2310.0 19.72 348.62 2291.3 183.5 2410.0 22.99 348.04 2384.4 219.9 2510.0 26.36 346.56 2475.3 261.6 2053.7 2.07 127.0 341.8 2150.3 3.48 152.7 342.2 2245.3 3.25 183.7 343.1 2338.4 3.28 220.0 344.0 2429.3 3.43 261.7 344.5 120.66 N 39.76 W 145.41 N 46.58 W ~ 175.80 N 53.41 W 211.46 N 60.79 W 252.17 N 70.00 W 2610.0 29.38 346.42 2563.7 308.3 2710.0 32.33 347.53 2649.5 359.6 2810.0 34.65 346.39 2732.9 414.8 2910.0 37.81 347.86 2813.6 473.9 3010.0 41.37 346.60 2890.6 537.6 2517.7 3.02 308.4 344.8 2603.5 3.00 359.7 345.1 2686.9 2.40 414.8 345.3 2767.6 3.28 473.9 345.6 2844.6 3.65 537.6 345.8 297.61 N 80.92 W 347.58 N 92.46 W 401.33 N 104.92 W 458.94 N 118.06 W 521.07 N 132.17 W 3110.0 44.22 346.67 2964.0 605.5 3210.0 47.06 346.73 3033.9 677.0 3310.0 48.59 347.22 3101.0 751.1 3410.0 49.77 345.28 3166.4 826.7 3510.0 52.29 346.45 3229.3 904.5 3610.0 54.68 343.89 3288.8 98.4.8 3710.0 58.17 343.29 3344.1 1068.0 3810.0 60.64 343.36 3395.0 1154.0 3910.0 62.56 343.54 3442.6 1241.9 4010.0 63.83 342.47 3487.6 1331.0 4110.0 66.31 344.03 3529.8 1421.6 4210.0 66.79 343.65 3569.6 1513.2 4310.0 66.43 342.80 3609.3 1604.9 4410.0 68.32 342.85 3647.8 1697.1 4510.0 70.51 343.09 3682.9 1790.5 2918.0 2.85 605.5 345.9 2987.9 2.84 677.0 346.0 3055.0 1.57 751.1 346.1 .3120.4 1.88 826.7 346.1 3183.3 2.68 904.5 346.1 3242.8 3.15 984.8 346.0 3298.1 3.53 1068.1 345.8 3349.0 2.47 1154.1 345.6 3396.6 1.93 1242.0 345.5 3441.6 1.59 1331.1 345.3 3483.8 3523.6 3563.3 3601.8 3636.9 2.86 1421.8 345.2 .59 1513.5 345.1 .86 1605.2 345.0 1.89 1697.4 344.9 2.20 1791.0 344.8 587.16 N 147.87 W 656.73 N 164.32 W 728.94 N 181.01 W 802.43 N 199.01 W 877.82 N 217.98 W 955.49 N 1035.40 N 1117.85 N 1202.17 N 1287.52 N 1374.35 N 1462.46 N 1550.34 N 1638.52 N 1728.03 N 238.57 W 262.12 W 286.81 W 311.87 W 337.96 W 364.08 W 389.61 W 416.10 W 443.36 W 470.77 W A Gyro da t a D i r e c t i ona I B.P.EXPLORATION WELL: MPF-45, 5.5" DRILLPIPE Location: F-PAD, MILNE POINT FIELD,ALASKA Job Number: AK0795G279 Survey Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. H O R I Z 0 N T A L COORDINATES feet 4610.0 70.13 343.05 3716.6 4710.0 71.43 344.31 3749.5 4810.0 70.30 345.50 3782.3 4910.0 69.53 344.42 3816.6 5010.0 69.52 345.73 3851.6 1884.6 1978.9 2073.4 2167.2 2260.9 3670.6 3703.5 3736.3 3770.6 3805.6 .38 1885.1 344.7 1.76 1979.5 344.6 1.59 2074.0 344.6 1.27 2167.9 344.7 1.23 2261.6 344.7 1818.11 N 1908.72 N 1999.93 N 2090.63 N 2181.15 N 498.19 W 524.72 W ~-~ 549.32 W 573.69 W 597.82 W 5110.0 71.55 346.69 3884.9 5210.0 72.5.9 346.01 3915.7 5310.0 71.94 346.37 3946.2 5410.0 71.64 347.89 3977.4 5510,0 71.17 348.14 4009.3 2355.2 2450.3 2545 · 6 2640.6 2735.3 3838.9 3869.7 3900.2 3931.4 3963.3 2.22 2355.8 344.7 1.22 2450.9 344.8 .73 2546.2 344.8 1.47 2641.1 344.9 .53 2735.7 345.0 2272.72 N 2365.17 N 2457.66 N 2550.26 N 2642.98 N 620.29 W 642.74 W 665.48 W 686.64 W 706.32 W 5610.0 70.57 347.14 4042.1 5710.0 70.22 346.87 4075.7 5810.0 71.61 346.90 4108.3 5910.0 71.87 346.18 4139.7 6010.0 71.38 347.18 4171.2 6110.0 70.85 347.39 4203.6 6210.0 71.92 347.00 4235.5 6310.0 71.70 346.16 4266.7 6410.0 71.24 344.95 4298.5 6510.0 72.50 346.32 4329.6 2829.7 2923.9 3018.4 3113.4 3208.3 3302.9 3397.6 3492.6 3587.4 3682.4 3996.1 4029.7 4062.3 4093.7 4125.2 4157.6 4189.5 4220.7 4252.5 4283.6 1.12 2830.1 345.1 .43 2924.3 345.2 1.39 3018.7 345.2 .73 3113.7 345.3 1.07 3208.5 345.3 .57 3303.1 345.4 1.13 3397.8 345.4 · 83 3492.8 345.5 1.24 3587.6 345.5 1.81 3682.6 345.5 2735.26 N 2827.05 N 2919.09 N 3011.45 N 3103.79 N 3196.09 N 3288.50 N 3380.91 N 3472.72 N 3564.78 N 726.54 W 747.72 W 769.17 W 791.27 W 813.14 W 833.96 W 854.97 W 877.01 W 900.66 W 924.24 W 6610.0 72.05 346.85 4360.1 6710.0 72.11 346.96 4390.8 6810.0 71.96 344.54 4421.7 6910.0 71.94 343.33 4452.7 7010.0 71.06 342.03 4484.4 3777.7 3872.8 3967.9 4062.9 4157.6 4314.1 4344.8 4375.7 4406.7 4438.4 .68 3777.9 345.5 .12 3873.0 345.5 2.31 3968.1 345.5 1.15 4063.2 345.5 1.51 4157.9 345.4 3657.44 N 3750.11 N 3842.30 N 3933.66 N 4024.19 N 946.34 W 967.89 W 991.31 W 1017.62 W 1045.85 W A Gyro da t a D i r e c t i ona I Survey B.P.EXPLORATION WELL: MPF-45, 5.5" DRILLPIPE Location: F-PAD, MILNE POINT FIELD,ALASKA Job Number: AK0795G279 Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL C O O R D I N A T E S feet 7110.0 71.22 343.90 4516.7 7210.0 72.14 343.98 4548.1 7310.0 72.60 344.56 4578.4 7410.0 71.85 344.06 4609.0 7510.0 71.39 344.48 4640.5 7560.0 70.86 345.52 4656.7 7590.0 70.66 344.85 4666.6 7620.0 70.50 343.74 4676.5 7650.0 70.30 344.33 4686.6 7680.0 70.62 344.91 4696.6 4252.1 4347.0 4442.2 4537.4 4632.2 4679.5 4707.9 4736.1 4764.4 4792.7 4470.7 4502.1 4532.4 4563.0 4594.5 4610.7 4620.6 4630.5 4640.6 4650.6 1.78 4252.4 345.4 .92 4347.3 345.3 .72 4442.6 345.3 .89 4537.8 345.3 .61 4632.7 345.3 2.24 4680.0 345.3 2.21 4708.3 345.3 3.53 4736.6 345.3 1.97 4764.9 345.3 2.11 4793.1 345.3 4114.67 N 1073.57 W 4205.89 N 1099.83 W 4297.63 N 1125.66 W 4389.30 N 1151.41 W 4480.65 N 1177.14 W 4526.35 N 1189.39 W 4553.73 N 1196.63 W 4580.97 N 1204.29 W 4608.14 N 1212.06 W 4635.40 N 1219.56 W 7710.0 71.55 346.54 4706.4 7740.0 71.66 346.48 4715.8 7770.0 71.46 345.52 4725.3 7800.0 71.31 346.20 4734.9 7830.0 71.26 344.84 4744.5 7860.0 71.18 345.01 4754.2 7890.0 71.40 346.61 4763.8 7920.0 71.29 345.40 4773.4 7950.0 71.08 345.27 4783.1 7980.0 71.20 345.80 4792.8 4821.0 4849.5 4878.0 4906.4 4934.8 4963.2 4991.6 5020.0 5048.4 5076.8 4660.4 4669.8 4679.3 4688.9 4698.5 4708.2 4717.8 4727.4 4737.1 4746.8 6.00 4821.5 345.3 .41 4850.0 345.3 3.11 4878.4 345.3 2.21 4906.9 345.3 4.30 4935.3 345.3 .60 4963.7 345.3 5.10 4992.1 345.3 3.84 5020.5 345.3 .81 5048.9 345.3 1.72 5077.3 345.3 4662.90 N 4690.58 N 4718.20 N 4745.76 N 4773.27 N 4800.70 N 4828.25 N 4855.83 N 4883.30 N 4910.79 N 1226.56 W 1233.20 W 1240.08 W 1247.03 W 1254.13 W 1261.52 W 1268.48 W 1275.36 W 1282.55 W 1289.64 W 8010.0 71.49 346.32 4802.4 8040.0 71.33 346.13 4811.9 8070.0 71.02 345.27 4821.6 8100.0 70.80 345.02 4831.4 8130.0 70.59 344.67 4841.3 5105.2 5133.7 5162.1 5190.4 5218.7 4756.4 4765.9 4775.6 4785.4 4795.3 1.91 5105.7 345.3 .80 5134.2 345.3 2.90 5162.5 345.3 1.08 5190.9 345.3 1.30 5219.2 345.3 4938.37 N 4965.99 N 4993.51 N 5020.91 N 5048.24 N 1296.49 W 1303.26 W 1310.27 W 1317.54 W 1324.94 W A Gyro da t a D i r e c t i ona i Survey B.P.EXPLORATION WELL: MPF-45, 5.5" DRILLPIPE Location: F-PAD, MILNE POINT FIELD,ALASKA Job Number: AK0795G279 MEASURED I N C L AZIMUTH VERTICAL VERTICAL SUBSEA DEPTH DEPTH SECTION DEPTH feet deg. deg. feet feet feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. Final Station Closure: Distance: "5219.21 ft Az: 345.29 deg. Page 5 HORIZONTAL COORDINATES feet for B.P.EXPLORATION WELL: MPF-45, 5.5" DRILLPIPE Location: F-PAD, MILNE POINT FIELD,ALASKA Job Number: AK0795G279SS Run Date: 15-Jul-95 10:58:07 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.515000 deg. N Sub-sea Correction from Vertical Reference: 46 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 346.080 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a D i r e c t i ona i Survey B.P.EXPLORATION WELL: MPF-45, 5.5" DRILLPIPE Location: F-PAD, MILNE POINT FIELD,ALASKA Job Number: AK0795G279SS Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 2100.0 14.81 344.39 2146.0 139.0 2200.0 18.23 347.28 2246.0 168.6 2300.0 21.64 348.28 2346.0 204.9 2400.0 25.27 347.04 2446.0 248.1 2500.0 28.78 346.45 2546.0 299.0 2.75 152.7 342.0 3.36 183.7 342.7 3.27 220.0 343.6 3.38 261.7 344.3 3.10 308.4 344.7 132.53 N 43.03 W 161.31 N 50.15 W 196.74 N 57.74 W 239.04 N 67.03 W 288.52 N 78.73 W 2600.0 32.21 347.48 2646.0 357.5 2700.0 35.16 346.63 2746.0 424.4 2800.0 39.31 347.33 2846.0 500.7 2900.0 43.52 346.65 2946.0 588.8 3000.0 47.34 346.82 3046.0 690.3 3.00 359.7 345.1 2.55 473.9 345.4 3.43 537.6 345.7 3.05 605.5 345.8 2.61 751.1 346.0 345.53 N 91.98 W 410.67 N 107.05 W 485.09 N 124.00 W 570.95 N 144.02 W 669.74 N 167.32 W 3100.0 49.40 345.89 3146.0 803.1 3200.0 52.96 345.73 3246.0 927.0 3300.0 58.26 343.29 3346..0 1071.3 3400.0 62.66 343.46 3446.0 1248.7 3500.0 66.51 343.88 3546.0 1458.9 3600.0 68.23 342.85 3646.0 1692.8 3700.0 71.29 344.18 3746.0 1968.8 3800.0 69.52 345.52 3846.0 2245.9 3900.0 71.94 346.37 3946.0 2545.0 4000.0 70.53 347.11 4046.0 2840.7 1.79 826.7 346.1 2.81 984.8 346.0 3.49 1154.1 345.8 1.90 1331.1 345.4 1.93 1513.5 345.1 1.84 1697.4 344.9 1.61 1979.5 344.6 1.23 2261.6 344.7 .74 2546.2 344.8 1.04 2924.3 345.1 779.48 N 899.62 N 1038.47 N 1208.69 N 1410.22 N 1634.48 N 1899.05 N 2166.61 N 2457.09 N 2745.94 N 193.39 W 223.76 W 263.04 W 313.86 W 374.47 W 442.11 W 521.89 W 593.94 W 665.34 W 729.00 W 4100.0 71.77 346.38 4146.0 3132.4 4200~0 71.85 346.72 4246.0 3429.6 4300.0 72.26 346.61 4346.0 3733.7 4400.0 71.94 343.59 4446.0 4042.5 4500.0 72.08 343.97 4546.0 4340.5 · 80 3208.5 345'.3 1.03 3492.8 345.4 1.20 3777.9 345.5 1.40 4063.2 345.5 .98 4347.3 345.3 3029.95 N 3319.60 N 3614.66 N 3914.03 N 4199.66 N 795.65 W 862.39 W 936.13 W 1011.96 W 1098.03 W A Gyro dar a D i r e c t i ona i Survey B.P.EXPLORATION WELL: MPF-45, 5.5" DRILLPIPE Location: F-PAD, MILNE POINT FIELD,ALASKA Job Number: AK0795G279SS SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH feet deg. deg. feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 4600.0 71.21 344.83 4700.0 71.25 344.87 4795.3 70.59 344.67 4646.0 4648.3 1.16 4680.0 345.3 4746.0 4939.2 3.73 4963.7 345.3 4841.3 5218.7 1.30 5219.2 345.3 4496.20 N 4777.49 N 5048.24 N 1181.31 W 1255.27 W 1324.94 W Final Station Closure: Distance: 5219.21 ft Az: 345.29 deg. Page gyro/data 4. QUALITY CONTROL SR279.DOC gyro/data QUALITY CONTROL REPORT JOB NUMBER: AK0795G279 TOOL NUMBER: 725 MAXIMUM GYRO TEMPERATURE: 74.31 C MAXIMUM AMBIENT TEMPERATURE: 39.8 C MAXIMUM INCLINATION: 68.88 AVERAGE AZIMUTH: 346.08 WIRELINE REZERO VALUE: N/A REZERO ERROR / K: N/A CALIBRATION USED FOR FIELD SURVEY: 1224 CALIBRATION USED FOR FINAL SURVEY: 1224 PRE JOB MASS BALANCE OFFSET CHECK: -.10 POST JOB MASS BALANCE OFFSET CHECK~ : CONDITION OF SHOCK WATCHES -.10 USED -.10 UPON ARRIVAL AT RIG: OK UPON COMPLETION OF SURVEY: UPON RETURN TO ATLAS OK OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH FIELD SURVEY 8130 70.59 344.67 FINAL SURVEY 8130 70.59 344.67 'i'VD 4841.3 4841.3 NORTHING 5048.24N 5048.24N EASTING 1324.94W 1324.94W SR279.DOC gyro/data FUNCTION TEST JOB NUMBER: AK0795G279 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 8130 70.59 70.59 70.59 70.59 70.59 AZIMUTH M.D. ff 1 2 3 4 5 8130 344.67 344.71 344.69 344.71 344.72 SR279.DOC gyro/data 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR279.DOC gyro/data EQUIPMENT REPORT JOB NUMBER: AK0795G279 DOWNHOLE ELECTRONICS PRIMARY TOOL No. 725 GYRO SECTION A0065 DATA SECTION C0031 POWER SECTION C0006 BACKUP TOOL No. 722 GYRO SECTION A0051 DATA SECTION C0023 POWER SECTION C0022 SURFACE ELECTRONICS COMPUTER POWER SUPPLY PRINTER INTERFACE A0153 A0085 A0029 A0035 COMPUTER POWER SUPPLY PRINTER INTERFACE A0213 A0055 A0079 A0071 WIRELINE COMPANY: CABLE SIZE: ATLAS WIRELINE 5/16" RUNNING GEAR 2 1/2" SYSTEM TOTAL LENGTH OF TOOL: MAXIMUM O.D.: 17.5 feet 2.5 INCHES TOTAL WEIGHT OF TOOL: 240Lbs SR279.DOC gyro/data CHRONOLOGICAL REPORT JOB NUMBER: AK0795G279 7/15/95 1800 1930 2300 0130 0230 0430 0600 0700 LEAVE ATLAS ARRIVED AT LOCATION SPOT UNIT, MAKE UP TOOL RUNNING IN HOLE 7830' SURVEYING OUT LAY DOWN AND BREAK DOWN TOOL PROCESS SURVEY. RETURN TO ATLAS. SR279.DOC d rvices rilling 900 East Benson Boulevard, MB 8-1 · Anchorage, Alaska 99508 (907) 561-5111 Fax: (907) 564-5193 December 14, 1998 Wendy Mahan Natural Resource Manager Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501-3192 RECEIVED Re: Annular Disposal Information Request Dear Ms. Mahan: ' DEC 141998 Alaska Oil & Gas Cons, Commission Anchorage On October 28, 1998 you requested an update from Shared Service Drilling regarding Annular Disposal Records from July 25, 1995 through preSent time. We compared your list with our records and are able to provide you with the following data: Individual Annular Disposal Logs from the SSD database which coincide with the approved wells on your attached AOGCC Annular Log. The..SSD records are proVided to you in the same order as listed on your log. · There were some wells on your list which were not injected into. These wells are identified aS follows: · Endicott wells 1-03/P-16, 1.65/N-25, 1-59/0-24 · Exploration well Pete's Wicked #1 · Milne Point wells E-22, E-23, F-O1, L-16, J-19, L-25, F-30, L-21, K-38, NMP #1 & #2, K-05, K-02, H-07, K-25, K-37, E-17, F-21, .K-30, K-34, K-21i, F-66, K-06, K-54, K-33, F-49i, K-18 · PBU Wells E-38, 18-34, 15,42, S-29A, 15-46, B-36, 15-43, 11-38 · The reason many of these annuli were not used is because the waste materials generated from these wells were injected into other approved annuli. Hopefully the injection logs submitted with this letter will clarify this. In addition, please note that our records show: · The wells listed above in italics were permitted but not used for annular disposal. · The wells listed above in BOLD were not permitted for annular disposal. Wells drilled after June 6, 1996 were required by SSD procedure to be permitted with a SUndry Approval (10-403) form. Our records show that no Sundry Approval for Annular Disposal was filed for these wells. Wells drilled between July 25, 1995 and June 6, 1996 were automatically approved for annular disposal with the Permit to Drill. · We also provide you with a cumulative report from our database of records from July 25, 1995 through the present. From those records, we show the following wells not listed on your report were used for annular disposal: ,. ,Annular Disposal Letter .'. 12/14/98 Endicott wells 1-23/O- 15, 1-6 l/Q-20, 2-40/S-22 · · Exploration well Sourdough #3 - · MdnePointwellsF-06, H-05, H-06, J-13, L-24 - · PBU wells-18-30, 18-31, 14~,~-43,~-34, E-36, G-~A, and S-33- ~-oS~ 33-~ ' ~C,o~ Indiv~du~ logs ~e provided to ~ou foi these ~ogs as we~l. ~z- IOZ_ · Finally, our records show that the B-24 outer annulus was left open (see attached correspondence) Thank you for the opportunity to provide clarity to these records. If I can be of any further assistance please do not hesitate to contact me at 564-5183, or Karen Thomas, Environmental Advisor at 564-4305. Sincerely, Fritz P. Gunkel Shared Service Drilling Manager FPG/KMT cc: Dave Wallace - HSE Manager (w/out attachments) RECEIVED oEc !4- 1998 Alaska Oil & :Gas Cons. 'Commission An,cho,ra~e ANNULAR INJECTION DATA ENTRY SCREEN Asset Nlill3.e. .......................................... Rig Name ~I.~.{~9.r.~..~.-/.F,, ............................. Inj Well Name M..P...F.:.~.~. ..................................... Sur Csg Dep §.6.7..~. ................ Cumulative Data I ~! ~weil T°tal Legal Oesc .1..9.7.9.'.bI~.L.:~.6.Q.8.'.~.El~,..~.e.c..Q,.T..1.31~,..B.1.0.E .................................... Research Permit Start ........ .-(/~[]../.~.~. ........ Permit End .......'[~.:~.1/~.~. ....... *Permit Expires in 30 Days or Less* .Ri~: ComPletion i Format!O~ ', int6tmittant 'Final: aud/c~g WaSh .:: ~l~idS:::~ ::~ ? :~ .'FlUids:-'.: ~. : :::: F'reez~ . i FreeZe ........ .tz,.~.~.~ ......... ~ ....... :,. ......... ; ................................................. .t¢1. ........... Daily Data ~ i Da:led ,::~:::: :: i 1~'iSF:~;~' ................ i~?~]~'~-/~'B' ........... !'~-~ .............. : ............ l ] ? ............................................ §~':~ ...................... 0i3'~'~ ....................... _. i ~'95 ?'~A~"End"Sb~A~ ............... MPF-53 ~08/01/85 -' i99° ! " 390 MPF-53 ~08/05/95 / 170 ~ I t ................................................................... ' I i , 165 ~-~ ~o.~o~ ~o~ ]- ! ..........~ ~o~ MPF-53 i08/08/95 i127 i i I 127 ~~ ......... ~:~'~ ......... d'~"'~'~ ................. ~ ....................... ~- ................ i ...................... ,,~ ................................. ' ................................................................................................................... ............ ~~ ............. "~; .........................~-~ .............................. ~ ....................... i ....................... ' ................... ~'~ ........................... ~ ........................ ' ................................... ~pp-:~ ............... ~-~-~ ...... ~ .......... : ................ ..................................................... : ............................... ~?B ................................... , .... ~:~ ............. ~i.~..~i~ ............ ~.~ .............................................. ,, ......................................................................................................................................... aa~d.~ u.~-~ io"~ 1~o ]' !' ~zo MPF-53 i08/15/95 1920 I I ~ 920 MPF-53 i08/16195 j770 I I ~ 106 876 UPF-aa 11m3/.5 i200 i I ~ 200 ......................................... MPF-38 ~?? ,274 !~ l~ ~ 274 MPF-38 ~11/15/95 .............. . ................................ 200 MPF-38 ~11116/95 ~650 ~ ~' ~' ; 650 ................................................................. ~PF-~ ~1a7/gs ~3~0 ~~ ! ~ 3~0 MPF-38 ~11/18/95 ] 1,927 ~' I ~ 1,927 [ ~ ~ ........................................................................ ~PF-38 ~ 11/19/95 {320 ~ ~ ~ 320 ......................................................................................................................... ~PF-~ ....... ~-~"~7~)~ ...... ~-~ ...................... ] ..... ~ ............. ~ ............. ~-"~ ..................... 181 MPF-38 i 1/21/95 665 Shar(,d service [hilling Annd1'ar Injection Volumes July 25, 199.5 until December 1998 Cumulative Report Rig Inj Well Endicott Doyon 15 1 - 19/I- 18 Doyon 15 1-23/O- 15 Doyon !5 1-33/M-23 Surface Casing ' Cum Mud Depth Legal Desc Cum Total & Ctgs 5000 Sec. 36, T12N, R16E 8,960 7,848 _ . . 4246 2020'FNL, 2087'FEW, SEC.36,T12N,R16E 32,084 30,604 5013 3217'NSL, 2114'WEL, Sec 36,T12N, R16E 9,879 9,729 Cum Rig Cum Compl Cum Form Cum Inlerm Cum Final Disposal Period Annulus Wash Fluids Fluids Freeze Freeze Start End Slatus . . 992 120 12/5/95 12/5/96 Open . . . 1,160 200 120 9/30/95 12/31/95 Open 150 8/31/95 12/31/95 Broached ~)oyon 15 1-61/Q-20 4236 3075'NSLi 2207'WEL, Sec 13,T12N, R16E 25,228 21,379 3oyon 15 2-40/S-22 4531 2020'FNL, 2289'FEL, Sec 36,T12N, R16E 31,195 29,952 '.'OA 2,613 1,176 60 12/5/95 12/5/96 Open 1,063 120 60 7/25/95 12/31/95 Open ~)oyon 14 15-47 3515 3648'NSL, 4956'WEL, Sec 22,T11N, R14E 3,002 903 2,009 90 11/7/95 12/31/95 Open )oyon 14 DS 15-45 3829 4749' NSL, 5180' WEL, Sec. 22, T11N, 1,882 1,697 134 51 4/4/96 4/4/97 Broached 216 820 2,283 66 12/21/95 12/21/96 )oyon 14 DS 15-48 3548 )oyon 14 DS 15-49 3667 Sec. 22, T11N, R14E 3,385 4676' NSL, 5165' WEL, Sec. 22, T11N, 4,669 1,559 1,141 1,904 65 2/21/96 2/21/97 )oyon 9 18-30 3930 1499'SNL, 26'WEL, Sec 24,T11N, R14E 2,266 936 380 800 150 7/25/95 12/31/95 Open . )oyon 9 18-31 3680 3719'NSL, 64'WEL, Sec 24,T11N, R14E 6,086 2,250 1,100 2,565 171 7/26/95 12/31/95 Open )oyon 9 18-32 3830 3632'NSL, 41'WEL, Sec 24,T11N, R14E 3,311 1,861 200 1,100 150 8/24/95 12/31/95 Open )oyon 9 18-33 4140 3690'NSL,.56'WEL, Sec 24,T11N. R14E 5,215 2,050 3,035 10 120 9/28/95 12/31/95 Open labors 18E 12-35 3543 348'NSL, 705'VVEL, Sec 18,T10N, R14E 3.723 3,436 137 150 9/1/95 12/31/95 Open labors 18E 12-36 3452 63'FSL, 899'FEL, Sec 18,T10N. R15E 4.002 1.961 50 1,871 120 10/13/95 12/31/95 Open labors 18E 13-36 3431 1585'NSL, 5187~/VEL, Sec 13,T10N, R14E 4,137 3.523 464 150 10/26/95 12/31/95 Open ~abors 18E 14-44 3288 2829'NSL, 1617~VEL, Sec 9.T10N, R14E 3,974 2,319 1,535 120 8/17/95 12/31/95 Open xploration ool 4 Sourdough #3 4236 2245'FSL, 5067' FEL, Sec. 29, T9N. R24E 5,786 4.630 1,156 1/26/96 1/26/97 Closed '.ilne 27E MPK-17 3508 3648'NSL,2100~/VEL, Sec.03,T12NR 11E 19,608 18,538 285 685 100 4/18/96 4/18/97 Open abors 22E MPC-23 4941 1038 NSL. 2404 WEL, Sec 10,T13N, 2,060 1,800 130 130 1/25/96 1/25/97 Open abors 22E MPC-25 8595 1143'FNL, 2436'FWL, Sec 10,T13N, R10E 1,905 1,465 300 140 1/5/96 1/5/97 Open a.bors 22E MPC-26 4704 1086 NSL, 2419 WEL, Sec 10.T13N, 5,228 4,483 555 190 12/19/95 12/19/96 Open abors 22E. · MPC-28 5405 Sec 10.T13N, R10E 425 350 ' 75 2/15/96 2/15/97 Open Open Open Page I SC NF..D ,]OV 8 200Z Shard Service Drilling Annular Injection Volumes July 25, 199,~ until December 1998 Cumulative Report Rig Nabors 22E Nabors 22E Nabors 22E Nabors 22E Inj Well MPF-06 MPF-14 ._. Surface Casing Depth Legal Desc 8766 Sec 06,T13N, R10E 6690 Sec'06,T13N, R10E UM Cum Mud Cum Rig CumCompl Cum Form Cum Interm Cum Final Cum Total & Ctgs Wash Fluids Fluids Freeze Freeze .. . . . 1,927 1,731 196 ............. '~ 8,_ _717__ .. 1.7,107 ._ 1,27~0_ ............. ................ 340 6/3/96 7919 2189'NSL, 2591'WEL, Sec 6,T13N, R10E 19,775 18,794 735 . 190 56 6/17/96 5335 2882'NSL, 4028'WEL, Sec 34,T13N, R10E 8,283 7,711 382 190 8/19/95 MPF-70 MPH-05 Nabors 22E Nabors 22E Nabors 22E M_pH-o6 7304 _. 28_2_4,.N?L,._4__o4~4'WE~L_,_Sec'_34~T13N,_ R!0. E._ 8,_51_5~ ..... 8,.3_3~5 .......................................... !_8.o _.8/5/95 MPI-07 2680 2339'NSL, 3906'WEL, Sec 33,T13N, R10E 1,680 1,280 250 80 70 9/21/95 MPJ-13 2835 2319'NSL, 3179'WEL, Sec 28,T13N, R10E 14,127 13,292 645 Nabors. 22E MPJ-16 . 3112 2317'NSL, 3336'WEL, Sec 28,T13N, R10E Nabors 27E B-24 4080 Sec 18,T13N, R11E UM 985 915 Disposal Period Annulus Slarl End Status 1/25/96 1/25/97 Open · . 6/3/97 Open 6/17/97 O ~en 12/31/95 O3en 12/31/95 O)en 12/31/95 O 60 130 10/17/95 12/31/95 O)en 70 11/1 2/95 12/31/95 O )en 1/25/96 1/25/97 O )en 70 12/12/95 12/12/96 O 1,468 1,396 72 Nabors 27E MPF-22 8841 Sec 06,T13N, R10E UM 6,536 6,466 Nabors 27E MPF-25 3405 1857'NSL, 2696'WEL, sec 6,T13N, R10E ' 9,897 9,357 250 225 65 12/26/95 12/26/96 Open Nabors 27E MPF-37 6621 1931'NSL, 2643'wEL, sec 6,T13N, R10E 7,032 6,887 70 75 7/25/95 12/31/95 Open Nabors 27E MPF-38 8561 1994'NSL, 2731'WEL, Sec 6,T13N, R10E 9,232 9,157 75 12/6/95 12/31/95 __ ~_p_en~._. Nabors 27E MPF-45 6678 1979'NSL 2608'WEL, Sec 6,T13N,'R10E 17,562 17,381 181 7/31/95 12/31/95 Open Nabors 27E MPF~53 .6750 2028'NSL 2572'WEL, Sec 6,T13N, R10E 6,051 5,671 165 75 60 80 8/19/95 1 2/31/95 Open Nabors 27E MPF~61 6585 2077'NSL. 526'WEL; Sec 31,T14N, R10E 5,732 5,657 75 8/31/95 12/31/95 Open Nabors 27E MPF-62 6059 2141'NSL 2627'WEL, Sec 6,T13N, R10E 386 316 70 10/13/95 12/31/95 Open Nabors 27E MPF-69 5772 2125'NSL 2502'WEL, Sec 6,T13N, R10E 9,740 91665 75 8/31/95 12/31/95 Open Nabors 27E MPF-78 7085 2237'NSL 2555'WEL, Sec 6,T13N, R10E 8,476 7,456 40 775 65 140 9/12/95 12/31/95 Open Nabors 27E MPL-24 6515 3654'NsL, 5180'WEL, Sec 8,T13N, R10E 6,790 4,900 1,320 165. 335 70 11/27/95 12/31/95 Open WOA 18E F-33 3570 3332'NSL, 2174'WEL, Sec 2,T11N, R13E 1,468 183 660 465 160 2/21/96 2/21/97 Open 18E F-36 3691 2642'NSL, 2878'WEL, Sec 2,T11N, R13E 6,963 1,998 1,359 3,471 135 12/!8/9~ 12/18/96 Open _. Z)oyon 9 D-30 3456' 3625' NSL, 1066' WEL, SEC. 23, T11N, 5,261 2,811 1,275 1~035 140 1/31/96 1/31/97 Open ~)oyon 9 D-31 3215 SEC. 26, T11N, R13E 150 ' 150 4/20/96 4/10/97 Open 3oyon 9 D-33 3222 2965' NSL, 1067' WE[., SEC. 23, .T11N, 4,661 2,425 2,106 130 2/21/96 2/21/97 Open , ~labors 18E S-43 3121' 4211 'NSL,4503'WEL,SEC35,T12N,R 12E 5,943 2,636 1,716 1,511 80 5/7/97 5/7/98 OPEN Page 2 Shared, S'. ei~vice Dr..illing Annl~i~r Injection Volumes July 25, 1995. until December 1998 Cumulative Report Surtace Casing Rig Inj Well Depth Nabors 28E B-33 3504' Nabors 28E E-34 3664 Nabors 28E E-36 3648 . Nabors 28E E-37 3810 Cum Mud Cum Total & Ctgs Legal Desc .... 969'SNL 1898'EWL, Sec 31. T11N, R14E 3,974 2,842 168'SNL 500'WEL, Sec 6, T11N. R14E 9,656 7,228 1706'SNL 822'WEL, Sec 6,T11N, R14E 9,271 4,417 .. . 3391'NSL 881'WEL, Sec 6,T11N, R14E 4,695 4,241 Cum Rig Cum Compl Cum Form Wash Fluids Fluids _ _ 857 . . _ 1.420 858 1,293 3,096 374 Cum Interm Cum Final Disposal Period Annulus Freeze Freeze Start End Status 195 80 5/1/96 12/31/96 Broached 40 110 8/23/95 12/31/95 Open ._. 365 100 7/25/95 12/31/95 Open _. _ 80 9/16/95 12/31/95 Open Nabors 28E E-39 3638 3358'NSL 501'WEL, Sec 6,T11N, R14E Nabors 28E G-04A 3509 2917'NSL, 1974'WEL, Sec 12,T11N, R13E Nabors 28E G-21 3509 2911'NSL, 2368'WEL, Sec 12,T11N, R14E Nabors 28E S-24 2750 1633'SNL, 4228'WEL, Sec 35,T12N, R12E Nabors 28E S-33 2958 1639'SNL, 1487'WEL, Sec 35,T12N, R12E 2,250 928 ' 220 1,022 .............. 80 8/28/95 . 12/31/95. .O.p. e_n.. 5,937 1,798 1,824 2,315 ............... !0/20~95 .. 12/31~95_ .. _O_pen 11,430 3,956 3,072 4,270 70 62 .._ 9/8/.9__5 ..... !2/37<9_5 ..... 0P__.e_n ...... 20,261 11,773 2,177 5,751 275 285 12/9/95 . . i2/9/9_6- 0_pen . .. 18,014 6,613 2,431 8,392 270 308 12/1/95 12/1/96 Open Nabors 28E S-41 3331 4152` NSL, 4504' WEL, Sec 35,T12N, 8,062 4,159 2,034 1,754 ......... ............... 115 2/8/96 ....... 2/6!?_7 .... ~_p.e.n .... ...................................... 68 3/13/96 3/13/97 Open Nabors 28E S-42 3077 Sec 35, T12N, R12E 168 100 Nabors 2ES H-35 3157 4535'NSL, 1266'WEL, 'Sec 21,T11N, R13E 4,860 3,725 555 480 20 80 10/26/95 12/31/95 Open Nabors 2ES H-36 3550 4478'NSL, 1265'WEL. Sec 21,T11N, R13E 1,452 857 100 410 85 10/_2.6/9_~ .__ _1~2/31/95 Open SCANNED NOV ! $ 21)D2 Page 3 r ed riJl!iing TO: Blair Wondzell FROM: Chris West DATE: October 27, 1995 SUBJECT: MPB-24 Well Suspension APl # 50-029-22642 Blair; Please find attached a copy of the Form 10-403 to temporarily suspend this well as per AOGCC 20- AAC 25.110, As discussed this morning we propose setting three plugs in this well as detailed in the attached form. 'This will allow us to retain the wellbore for potential future sidetrack or service well use. We would like to keep the well's 9-5/8" x 7" annulus available for the injection of liquid 'wastes. There are no other well annulii on this pad for injection. The annulus for MPB-24 was approved for injection as part of the permit dated 25 January 1996. The annulus will be freeze protected before moving the rig. Thank you for your help in this matter. Please call me if I maY be of any assistance. Chris West Drilling. Operations Engineer Nabors 27E (907)-564-5089 6: [:.-.: i i i S L D ~'? 5 i !) .j i 0 .... 4- 0 7 ,~ / , ~ c c, H P L E T ~ 0 i',l ~:'.' ~-:, T~ / ! ? / ~ We 'i i 'i :: COH H ~: N TS WELL LOG TRANSMITI'AL To: State of Alaska October 28, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - MPF-45 RE: AK-MM-950731 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' J~an Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted LIS tape with.verification listing. API#: 50-029-22556-00 5631 Silverado Way, Suite G · Anchorage, AJaska 99518 · (9.07) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company ~ALASIC~ eared rvices rilllng BP Exploration / Arco Date: To: July 15, 1996 Alaska Oil & Gas Conservation Commission From: Kathy Campoamor Technical Assistant Subject: 10-407 for Permit #95-58, MPF-45 This attached Well Completion Report (10-407) for MPF-45 is a corrected version due to calculation errors made on the 'At Top of Productive Interval' and 'At Total Depth' when the original 10-407 was submitted. The well history summaries and directional surveys have previously been filed with the Commission and there are no changes. I apologize for any inconvenience this may have caused. Thank you for your assistance in this matter, Kathy Campoamor /klc ORIGINAL RECEIVED JUL 2 2 i99G Alaska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA ~vzs~D 07/]_5/96 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 95-58 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22556 4. Location of well at surface 9. Unit or Lease Name 1979' NSL, 2607' WEL, SEC. 6, T13N, RIOE Milne Point Unit · ......... ' lO. Well Number At Top Producing Interval ~ , MPF-45 1334' NSL, 56' WEL, SEC. 25, T14N, R9E !; [ 11. Field and Pool At Total Depth ~.. --,. 1599' NSL, 59' WEL, SEC. 25, T14N, R9E .~'~ -~ t~ '! Milne Point/Kupamk River 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE= 48.35' I ADL 355018 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 07/08/95 07/25/95 01/19/96I N/A feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost I 14220' MD / 7502' TVD 14107' MD / 7414' TVD YES [] NO [] N/A feet MD I 1800'(Approx.) 22. Type Electric or Other Logs Run GR/RES/NEU/DEN 23. CASING. LINER AND CEMENTING RECORD SE'FnNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BO'I-FOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.1# NTSOLHE 34' 110' 30" 250 sx Arctic, set I (Approx.) 9-5/8" 40# L-80 33' 6678' 12-1/4" ~3oo sx PF 'E', 250 sx 'G°, 250 sx PF 'E' 7" 26# L-80 32' 14191' 8-1/2" 225 SX Class "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3-3/8" Gun Diameter, 6spf 2-7/8", L-80 13562' N/A MD TVD 13781'-13865' 7153'-7220' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect w/ 65 bbls diesel Hydraulic fracture Kuparuk A 142,700# 16/20 carbofite 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) 02/04/96 ESP Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CFIOKESIZE IGAS-OIL RATIO TEST PERIOD II~ Flow Tubing Casing Pressure CALCULATEDi OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED ORIGINAL Alaska 0il & Gas 0OHS. Commission Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE .,. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. (Subsea) Top K3A 13780' 7105' Top K2A 13800' 7122' Top KIA 13828' 7144' 31. LIST OF A'FFACHMENTS 32. I hereby certify that the foregoing is ~true and correct to the best of my knowledge S,o.ed - - '~ ¢ _- .. _¢ _ i '%_..'X f/~ Title SeniorDrillinoEnoin¢¢r Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". R E C E IV ~ D Form 10-407 jUl_. 2_ 2 996 Alaska Oil & 6as Cons. Commission Anchorage BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: MP F-45 BOROUGH: NORTH SLOPE UNIT: UNKNOWN FIELD: UNKNOWN LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 07/08/95 06:00 SPUD: 07/08/95 12:30 RELEASE: OPERATION: DRLG RIG: NABORS 27E WO/C RIG: NABORS 27E 06/26/95 (1) TD: 110 PB: 110 06/27/95 (2) TD: 110 PB: 110 06/28/95 (3) TD: 110 PB: 110 LAY DOWN DERRICK MW: 0.0 MOVE SUB OFF WELL, SPOT TO PREP FOR MOVE. REMOVE CHUTE, INSTALL FROG, MOVE WHEELS IN, INSTALL YOKE AND STIFF ARMS. MOVE SUB TO MP F PAD. TURN SUB AROUND, SPOT PARRALLEL TO MP F-45. SET MATS FOR SUB AND PITS. MOVE PITS AHEAD, LAY HERCULITE. SPOT SUB AND PITS. REMOVE FROG AND WHEELS. SET MATS NAD LAY HERCULITE FOR MOTORS, MOVE MOTORS AND SPOT IN PLACE. LAY HERCULITE AND SPOT DIESEL TANK AND PARTS HOUSE. REMOVE GOOSENECK FROM MOTOR COMPLEX. LAY HERCULITE AND SPOT PIPE SHED IN FRONT OF MOTOR COMPLEX FOR CLEANING AND PAINTING. BERM ALL COMPLEXES, SUB, TANKS CHUTE AND DERRICK AREA. LEVEL SUB, OPEN WIND WALLS, BRIDLE UP AND SPOT DERRICK STAND. LAY OVER DERRICK FOR MAINTENANCE, CLEANING AND PAINT. RIG MAINTENANCE MW: 0.0 PICK UP TOOLS, HOSES. LOCK OUT AND TAG MUD PUMPS, ROTARY, DWKS, ALL MOTORS IN PITS. REMOVE LIGHTS FROM DERRICK. POSITION FIRE EXTINQUISHERS IN WELDING LOCATIONS. PLACE SAFETY EQUIPMENT IN PITS. CHAIN CROWN TO DERRICK STAND. REMOVE CHAIN GUARDS F/ #1 PUMP, WORK ON PUMP MOTOR SEALS. CHANGE LINE ON DRILLERS SIDE BRIDGE CRANE. FINISH BERNS. WORK ON MUD PUMP POP OFFS. REMOVE BAD GRATING AND TROUGH IN MUD PITS. DRAIN OIL FROM GEAR ENDS OF MUD PUMPS. REPLACE DRIVE CHAINS. CLEAN AND BUFF BOP DOORS RING GROVES AND RAM BLOCKS. CLEAN DERRICK WIND WALLS. COVER ELECTRIC OUTLETS IN DERRICK. CLEAN AND SCRAPE INSIDE MUD PIT WALLS. RIG MAINTENANCE MW: 0.0 RIG REPAIR & MAINTENANCE 06/29/95 (4) TD: 110 PB: 110 RIG MAINTENANCE GENERAL RIG MAINTENANCE MW: 0.0 06/30/95 ( 5) TD: 110 PB: 110 RIG MAINTENANCE CONTINUE RIG MAINTENANCE. MW: 0.0 RECEIVED JUP, J 1 ~ 1,996 Alaska Oil & 6r:~s Oons. Commsslon Anci~orago WELL ' MP F-45 OPERATION: RIG · NABORS 27E PAGE: 2 07/01/95 (6) TD: 0'( 0) 07/02/95 ( 7) TD: 0'( 0) 07/03/95 (8) TD: 0'( 0) 07/04/95 (9) TD: 0'( 0) 07/05/95 (10) TD: 0'( 0) 07/06/95 (11) TD: 0' ( 0) 07/07/95 (12) TD: 0' ( 0) 07/08/95 (13) TD: 0' ( 0) 07/09/95 (14) TD: 1520' (1520) 07/10/95 (15) TD: 3952'(2432) 07/11/95 (16) TD: 6330'(2378) 07/12/95 (17) TD: 6704' ( 374) RIG MAINTENANCE GENERAL RIG MAINTENANCE & REPAIR. GENERAL RIG MAINTENANCE GENERAL RIG MAINTENANCE & REPAIR RIG MAINTENANCE GENERAL RIG MAINTENANCE & REPAIR RIG MAINTENANCE GENERAL RIG MAINTENANCE & REPAIR RIG MAINTENANCE GENERAL RIG MAINTENANCE & REPAIR. RIG MAINTENANCE GENERAL RIG MAINTENANCE & REPAIR. RIG MAINTENANCE GENERAL RIG MAINTENANCE & REPAIR RIG REPAIR GENERAL RIG REPAIR & MAINTENANCE MW: 0.0 ViS: 0 MW: 0.0 VIS: 0 MW: 0.0 VIS: 0 MW: 0.0 VIS: 0 MW: 0.0 VIS: 0 MW: 0.0 VIS: 0 MW: 0.0 VIS: 0 MW: 0.0 VIS: 0 DRILLING MW: 0.0 VIS: 0 FUNCTION TEST THE DIVERTER. WITNESSED BY J. SPAULDING. MU BHA %1. DRILL ICE OUT OF CONDUCTOR F/38' T/ll0. DRILL T/1520. DRILLING MW: 0.0 VIS: 0 DRILL T/3036. CBU. MONITOR THE WELL--OK. DRILL T/3952. DRILLING MW: 0.0 VIS: 0 DRILL T/5095. MONITOR WELL -- OK. DRILL T/6330. RUN CASG MW: 0.0 VIS: 0 DRILL T/6704. CBU. MONITOR WELL CHANGE OUT DL. RIH T/6704. NO FILL. CBU. POOH T/RUN CASG. REPAIR EJECTOR ON PIPE SKATE. RU T/RUN 9-5/8" CASG. RECEIVED dUl~,l 1 R 1996 Oil & G~s Oons. Commission WELL : MP F-45 OPERATION: RIG : NABORS 27E PAGE: 3 07/13/95 (18) TD: 6704' ( 0) 07/14/95 (19) TD: 6950' ( 246) 07/15/95 (20) TD: 9009' (2059) TESTING BOPE MW: 0.0 VIS: 0 RIH W/ 9-5/8" CASG. CBU PRIOR T/CMT. PUMP 75 BBLS H20, 502 BBLS E, DROP BTTM PLUG, PUMP 51 BBLS G. DROP TOP PLUG. DISPLACE CMT @ 10.5 BBLS/MIN. BUMP PLUG @ 2000PSI. CIP @ 18:30 ON 7/12. NO CMT T/SURF. PERFORM TOP JOB. NU BOPE. TEST BOPE. DRILLING MW: 0.0 VIS: 0 FINISH TEST BOPE, OK. LD TEST PLUG. INSTALL WEAR RING. SERVICE RIG. STRAP, CALIPER, AND PU BHA. ORIENT MWD. LOAD SOURCES. FINISH MU BHA. RIH TO 6513'. CBU. TEST CASING. GOOD TEST. WASH TO 6595' TAG FC DRILL FC AND 76' OF CEMENT. CBU. FLOWCHECK WELL. OK. PUMP DRY JOB. POH TO MWD. SPERRY SUN RE-PROGRAM MWD TOOLS. RIH. DRILL REMAINDER CEMENT, RATHOLE AND 10' OF NEW HOLE. CBU. PULL INTO SHOE. PERFORM LEAKOFF TEST. DRILLING FROM 6714 - 6950' DRILLING DRILLING FROM 6950 - 9009' MW: 0.0 VIS: 0 07/16/95 (21) TD:10264' (1255) 07/17/95 (22) TD:l1561' (1297) 07/18/95 (23) TD:12435' ( 874) DRILLING MW: 0.0 VIS: 0 DRILLING FROM 9009 - 9104'. CBU. FLOWCHECK WELL, OK. PUMP DRY JOB. SET BACK KELLY. POH TO 9 5/8" SHOE. MONITOR WELL, OK. RIH TO 8495' NO PROBLEMS. RU GYRODATA/ATLAS WL. WLIN AND RUN IN HOLE REFERENCE GYRO. WLOH. RD ATLAS WL. FINISH RIH TO 9104' NO PROBLEMS. DRILLING FROM 9104 - 10264'. DRILLING MW: 0.0 VIS: 0 DRILLING FROM 10264 - 10734'. DRILLING FROM 10734 - 11490'. CIRC SWEEP AROUND. NOTHING UNUSUAL AT BOTTOMS UP. FLOWCHECK WELL, OK. PUMP DRY JOB. SET BACK KELLY. POH TO 8052'. PU KELLY FOR CHECK SHOTS @ 8052'. SET BACK KELLY. RIH W/ 2 JTS. PU KELLY AND TAKE CHECK SHOTS AT 8142' SET BACK KELLY. RIH TO 11447' MU KELLY. NO FILL. NO PROBLEMS. DRILLING FROM 11490 - 11561'. DRILLING MW: 0.0 VIS: 0 DRILLING FROM 11561 - 11657' SWAB/LINER OUT PUMP #1. CHANGEOUT SWAB/LINER. CIRC EP MUD LUBE AROUND WHILE CHANGE OUT. DRILLING FROM 11657 - 12435' WELL ' MP F-45 OPERATION: RIG : NABORS 27E PAGE: 4 07/19/95 (24) TD:13069' ( 634) 07/20/95 (25) TD:13327' ( 258) 07/21/95 (26) TD:13545' ( 218) 07/22/95 (27) TD:13780' ( 235) 07/23/95 (28) TD:13780' ( 0) 07/24/95 (29) TD:13780' ( 0) DRILLING MW: 0.0 VIS: 0 DRILLING FROM 12467 - 12688' CIRCULATE BEFORE 12 STAND SHORT TRIP TO VERIFY SURVEYS. FLOWCHECK WELL. OK. SET BACK KELLY. POH TO 11490' HOLE IN GOOD SHAPE. RIH TO 11644' FOR CHECKSHOT SURVEY. SET BACK KELLY. RIH TO 12395'. CHECKSHOT SURVEY. SURVEY GOOD. RIH TO 12688' DRILLING FROM 12688 - 13069'. DOWN LOAD MWD MW: 0.0 VIS: 0 DRILL F/ 13069 - 13327'. CHECK WELL FOR FLOW. PUMP PILL. SET BACK KELLY. POH. DRILLING MW: 0.0 VIS: 0 PULL WB. INSTALL TEST PLUG. RIG UP AND TEST BOPE AND CHOKE MANIFOLD. RIG DOWN TEST EQUIPMENT. INSTALL WEAR BUSHING. PICK UP MOTOR AND BIT #3. ORIENT MOTOR WIHT MWD. RIH TO 4295' CUT AND SLIP DRLG LINE. RETEST AND TEST CROWN SAVER. KELLY UP. TEST UPPER AND LOWER KELLY COCKS. FILL PIPE, CHECK MWD. SET BACK KELLY. RIH TO SHOE. CHECK WELL FOR FLOW. RIHT 0 8147' TAKE SURVEY CHECK SHOT. RIHT 0 10416'. LAY DOWN 27 JTS DP. CONTINUE RIH. REAM F/ 12434 - 13327' DRILL F/ 13327 - 13545'. PICK UP STEEL DC MW: 0.0 VIS: 0 DRILL F/ 13545 - 13780' ERRATIC TORQUE, VERY LOW PENETRATION. SURVEY, CHECK FOR FLOW, PUMP DRY JOB. POH TO SHOE. CHECK FOR FLOW. POH TO MWD. DOWN LOAD MWD SOURCE. SET BACK MWD. BREAK OUT BIT. CHANGE OUT SLEEVE ON MOTOR. SHANKS TOTALY WORN OFF BIT. PICK UP 6 STEEL DRILL COLLARS FOR FISHING ASSEMBLY. FISHING MW: 0.0 VIS: 0 WAIT ON FISHING TOOLS AND SERVICE HAND. MU BHA #4. RIH TO 13561' LAY DOWN 5 JTS DP. REAM AND WASH F. 13561 - 13778' DROP BALL, WASH OVER FISH TO 13781' CHECK WELL FOR FLOW. PUMP DRY JOB. POH, CHECK WELL @ SHOE, CONTINUE TO POH. BREAK DOWN RCJB. RECOVERED 1 INSERT FROM BIT. MAKE UP NEW RCJB, RIH. CLEANING OUT JUNK MW: 0.0 VIS: 0 RIH TO 13716' WASH AND REAM F/ 13716 - 13781' DROP BALL, PUMP DOWN BALL. LOAD JUNK BASKET. CUT 2 1/2" CORE W/ JUNK BASKET. CHECK FOR FLOW. PUMP DRY JOB. SET BACK KELLY. POH. CHECK FOR FLOW @ SHOE AND BHA. BREAK DOWN AND CLEAN JUNK BASKET. RECOVERED PIECES EQUIVELANT TO 1 CONE. MU CLEAN OUT ASSEMBLY. RIH, CHECK FOR FLOW @ SHOE. FILL PIPE @ SHOE, RIH TO 13696'. KELLY UP. REAM F. 13096 - 13781' HOLE LOOKS GOOD TO THIS DEPTH. RECEIVED JUN ] ~ ]996 Alaska 0il & Gas Cons. Commission WELL : MP F-45 OPERATION: RIG : NABORS 27E PAGE: 5 07/25/95 (30) TD:13903' ( 123) 07/26/95 (31) TD:14220' ( 317) 07/27/95 (32) TD:14220' ( 0) 07/28/95 (33) TD:14220' ( 0) DRILLING MW: 0.0 VIS: 0 REAM TO 13781. DRILL F/13781 TO 13831. CBU. POOH, CHECK WELL @SHOE &HWDP. LD BHA #4. LD MOTOR, XO & STABILIZER, REPAIR LEAK ON DRUM CLUTCH. MU BHA #5. LOAD MWD SOURCES AND CHECK. RIH TO 996. RIH TO 13734. CK. SHOT @8132. LOG F/13735 TO 13805. LOG F/13805 TO 13831. DRILL F/13831 TO 13903. LAY DOWN DRILL PIPE MW: 0.0 VIS: 0 DRILL F/13903 TO 14220. CBU & CONDITION MUD FOR 7" CSG. LAY DOWN DRILL PIPE CIRC. & COND. FOR CMT JOB MW: 0.0 VIS: 0 LAY DOWN HWDP & BHA. DOWN LOAD MWD. CON'T LAY DOWN BHA. RIG UP CSG TOOLS. RUN 244 JTS. 7" 26#, L-80. NSCC CSG. CBU & CONDITION HOLE. MIRU MW: 0.0 VIS: 0 CBU & COND. HOLE. TEST LINES W/4000 PSI. PUMP 20 BBL. WATER, 70 BBL SPACER. DISPLACED W/FILTERED SW & DIESEL. TEST CSG W/3500 PSI. RIG DOWN CEMENTING EQUIP. SET 7" PACKOFF. INSTALL TBG HGR W/2-WAY CHECK IN PLACE. CHANGE RAMS TO 5" NU TBG SPOOL & TREE. FREEZE PROTECT MP F-45 ANNULUS. SIGNATURE: (drilling superintendent) DATE: SUMMARY OF DAILY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: M PF-45 Rig Name: N-4ES AFE: 3301 27 Accept Date: 01/04/96 Spud Date: Release Date: 01/1 9/96 01/05/96 RIG ACCEPTED 01/04/96 @ 1600 HRS. MIRU, BERM & TRIM HERCULITE & RAISE & SCOPE DERRICK OVER WELL. RIG LINES TO TREE & TEST. ND DRY HOLE TREE & NU BOP'S. INSTALL 2-7/8" RAMS & INSTALL 2 BLIND FLANGES ON BOP STACK & INSTALL 3" VALVE ON CHOKE MANIFOLD. PULL FALSE BOWL & INSTALL TEST PLUG & ATTEMPT TO TEST. CHANGE OUT TEST PLUG & TEST BOP'S. 01/06/96 CONT TEST BOP'S. WITNESS BY AOGCC LOU GRIMMALDI. LOAD PIPE SHED W/ 2-7/8" TUBING & SLIP 42' DRLG LINE. SLM & DRIFT 2-7/8" TUBING & PU SAME. 01/07/96 CONT PU 2-7/8" TUBING TO RBP @ 13691'. RELEASE PLUG & CBU. WELL TAKING FLUID. SPOT XANVIS SWEEP W/LIQUID CSG ON BOTTOM. POOH & LD PLUG & TOOL. MU BHA & RIH W/SAME T/13741' TAG FILL. REV CIRC F/13741' T/13893'. PLUGGED PIPE WHILE MAKING CONNECTION @ 13893'. WORK PIPE & UNPLUG SAME, CIRC. 01/08/96 PUMP XANVIS SWEEP W/5# LIQUID CSG. WASH SAND F/13800' T/13893'. WORK STUCK PIPE & CIRC CONV & REV CIRC. TSA HAND HERE. WORK TORQUE DOWN, ATTEMPT TO GET JARS TO HIT. JARS DID NOT HIT. RIG ATLAS & RIH W/ CHEMICAL CUTTER & CUT TUBING @ 13752'. POOH & RD ATLAS. POOH W/2-7/8" TUBING. 01/09/96 CONT POOH & LD CUT JT TUBING. PULL WR & SET TEST PLUG. CHANGE RAMS T/3-1/2" & TEST. PULL TEST PLUG & SET WR. PU 3-1/2" DP & STRAP & DRIFT SAME. 01/10/96 TAG FISH @ 13755'. ATTEMPT TO CIRC OR REV CIRC. PLUGGED. JAR ON FISH. DROP DART, CONT JAR FISH W/ATTEMPTING TO SHEAR PUMP OUT SUB. RELEASE PUMP DOWN DART & SHEAR PUMP OUT SUB. LATCH BACK ON FISH. CONT JAR ON FISH, CIRC OUT SUB. RIG CAMCO SLICKLINE & RIH T/13434' & RETRIEVE DART F/PUMP OUT SUB. RIH W/CAMCO 1-1/4" PUMP BAILER T/13831' & WORK BAILER & POOH & RECOVER VISCOUS BRINE & TRAVIAL AMOUNT OF CARBOLITE. RD CAMCO. RU ATLAS & MU STRING SHOT & RIH W/SAME. Page 01/11/96 '~' ......... ~""':" ..... "'"'~'~ '~1' RIH W/STRING SHOT TAG FILL ~ 13790'. WORK ON STRING &.~SH~ ~ · WORK TORQUE & PULL FREE. POOH WITH WL & RD ATLAS. (sTR:I'~' ~HOT NOT FIRED.) MIX & PUMP PILL. POOH W/FA ~1, RECOVER 10' 2-7/8" TUBING. MU FA fi2. DRESS REV & BO TOOL & RIH T/2000'. SLIP DRLG LINE. CONT RIH T/13767'. ESTABLISH TORQUE & WEIGHT VALUES, SET REVERSING TOOL & A~EMPT TO BACK OFF W/REV TOOL. 01/12/96 CIRC. SET REV TOOL & MU BK OFF. CLOSE REV TOOL & PU FREE. CBU. POOH W/ 3-1/2" DP. LD FISH. INSPECT REV TOOL & CHANGE BO'I-I'OMS. INSTALL NEW 4-3/4" GRAPPLE. RIH W/REV TOOL TAG FISH @ 13773'. SET REV TOOL & A-I-r'EMPT TO MAKE BACK OFF. DROP BALL & LOCK TOOL, ATTEMPT TO RELEASE OVERSHOT. FISH APPEARS TO BE TURNING, UNABLE TO RELEASE OVERSHOT. WORK PIPE, ROTATE, MOVE FISH UP HOLE F/13773' T/13768'. SET REV TOOL, TRY TO RELEASE OVERSHOT WITH NO SUCCESS. CONT WORK PIPE & ROTATE. 01/13/96 WORK PIPE & ROTATE UP. ADD EP LUBE TO WO FLUID IN THE HOLE & ROTATE. LD PUP JT & SET KELLY BACK. POOH TO ABOVE PERFS @ 13762'. MONITOR WELL & PUMP PILL. POOH W/NO FISH & WET & LD REV TOOL. RU & TEST BOPE. 01/14/96 TEST BOPE. RD & IWR. SLIP & CUT DRLG LINE. CLEAR FLOOR & PREPARE & STRAP WASH DOWN TOOLS. PU MULE SHOE & 1-1/2" TUBING & RIH W/3-1/2" DP. REV CIRC & TAG FILL @ 13741'. CONT REV CIRC & WASH F/13741' T/13821'. REV XANVIS SWEEP & DISPLACE. MONITOR WELL & PUMP PILL. POOH W/3-1/2" DP. 01/15/96 POOH & LD 4 JTS 1-1/4" TUBING. MU FA#8 & RIH. TAG FISH @ 13713', ATTEMPT TO SCREW WITH LH INTO FISH. FISH DROPPED TO 13732'. A'I-I-EMPT TO SCREW INTO FISH, WORK LH TORQUE. PU 4000K ABOVE STRING WT. PULL 3 STD. WET W/FISH & PUMP SLOW DRY JOB. POOH W/FISH. LOST FISH WHILE POOH. MU FA #9 RIH T/3000'. SLIP DRLG LINE. CONT RIH W/FA #9 & TAG FISH @ 13732'. 01/16/96 TAG FISH @ 13732', SET 10K & TURN TO RIGHT SLAKING OFF TO 40K WITH A TOTAL OF 550 AMPS. FOUR ATTEMPTS TO PU FISH. MIX & PUMP PILL. POOH SLOW W/FISH. RECOVER LH OVERSHOT. GRAPPLE WAS BUSTED IN THE OVERSHOT. MU & RIH W/FA #10 T/3000'. SLIP & CUT DRLG LINE. CONT RIH & TAG FISH @ 13733'. PU WT, TAG FISH & SCREW IN FISH @ 13733'. JAR ON FISH A 70K OVERSTRING WT & PULL 90K OVER STRING WT. FISH CAME FREE. PULL 1 STD T/13626'. CBU, MIX & PUMP PILL. POOH, SLOW. 01/17/96 POOH & LD FISH. MU CLEAN OUT BHA & RIH T/13766'. ROT & WASH F/13766' T/ TOP OF FILL @ 14069'. WASH & ROTATE F/14069' T/14094'. PUMP XANVIS SWEEP, LOTS OF SAND COMING BACK, PUMP PILL & MONITOR WELL. POOH W/ CLEAN OUT ASSY. SLIP DRLG LINE. CONT POOH W/CLEAN OUT ASSY. Page 01/18/96 POOH, LD JUNK BASKET & MILL. MU BHA W/MULE SHOE & 7" CASING SCRAPPER. RIH TO TOP FILL @ 14074'. WASH DOWN & REV CIRC F/14074' T/14094'. CBU. REV CIRC. SPOT 20 BBLS CLEAN VISC BRINE PILL 100' ABOVE PERFS. POOH T/13658'. PERFORM CASING WASH UNTIL CLEAN BRINE TO SURFACE. MIX & PUMP XANVIS LIQUID CASING. 01/19/96 RIH W/ESP COMPLETION ASSY. SPLICE ESP ELECTRIC LINE. CONT RIH W/ESP COMPLETION & MU HANGER. INSTALL PENETRATOR, SPLICE & TEST ESP LINE. LAND TUBING, RILDS, LD LJ, INSTALL TWO. ND FLOWLINE, RISER & BOP'S. NU ADAPTER FLANGE & XMAS TREE & TEST. NU FREEZE PROTECT LINES & TEST. FINAL TEST ON PENETRATOR & PULL TWC. SET BPV. FREEZE PROTECT WELL W/ 65 BBLS DIESEL DOWN BACK SIDE & BULLHEAD & 15 BBLS ON TUBING. SECURE XMAS TREE & CLEAN PITS. RIG RELEASED 01/19/96 @ 2400 HRS. RECEIVED JUF~ I ~ i996 Alaska Oil & Gas Cons. CO!Tlli}iS$iOl! Page 3 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 BP EXPLORATION (ALASKA) INC. MILNE POINT / MPF-45 500292255600 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 2/95 DATE OF SURVEY: 072595 MWD SURVEY JOB NUMBER: AK-MM-950731 KELLY BUSHING ELEV. = 48.35 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 .00 -48.35 0 0 167 167.25 118790 0 19 252 252.93 204.58 0 12 345 345.86 297.51 0 11 436 436.86 388.51 0 18 N .00 E .00 .00N .00E N 4.55 W .20 .48N .04W N 58.59 W .31 .81N .19W N 43.83 W .06 1.01N .44W N 60.91 W .14 1.23N .76W .00 .48 .83 1.09 1.38 524 524.49 476.14 0 17 613 613.76 565.41 0 23 702 702.35 654.00 0 46 794 794.32 745.97 0 54 883 883.73 835.38 0 55 48.31 W .39 1.20N 1.12W 1.43 16.62 W .23 .76N 1.38W 1.06 15.71 W .43 .liS 1.63W .29 22.41 W .18 1.37S 2.07W -.83 32.47 W .18 2.63S 2.73W -1.90 980 980.03 931.68 0 24 1075 1075.81 1027.46 0 58 1168 1167.92 1119.57 1 49 1262 1262.34 1213.99 3 9 1357 1357.17 1308.82 4 50 S 76.17 W .72 3.37S 3.47W N 27.82 W 1.00 2.73S 4.17W N 22.15 W .94 .68S 5.09W N 13.16 W 1.46 3.25N 6.26W N 9.52 W 1.79 9.76N 7.52W -2.44 -1.65 .56 4.66 11.28 1453 1452.25 1403.90 6 38 1547 1546.27 1497.92 7 45 1640 1638.25 1589.90 9 26 1736 1732.77 1684.42 10 21 1829 1824.16 1775.81 10 6 N 11.66 W 1.90 19.15N 9.30W N 15.52 W 1.29 30.68N 12.12W N 16.80 W 1.83 44.04N 16.01W N 17.11 W .94 59.82N 20.82W N 17.09 W .26 75.58N 25.67W 20.82 32.69 46.60 63.07 79.54 1920 1913.44 1865.09 10 19 2017 2008.96 1960.61 11 10 2111 2100.98 2052.63 13 33 2207 2192.84 2144.49 16 43 2300 2281.09 2232.74 19 45 N 17.10 W .24 90.97N 30.40W N 16.46 W .88 108.34N 35.63W N 15.80 W 2.52 127.72N 41.23W N 13.10 W 3.41 151.79N 47.37W N 12.00 W 3.28 180.18N 53.66W 95.61 113.73 133.89 158.73 187.80 2394 2369.20 2320.85 22 40 2490 2456.70 2408.35 26 0 2583 2539.67 2491.32 28 31 2678 2621.35 2573.00 31 49 2773 2700.96 2652.61 33 38 N 10.76 W 3.13 213.70N 60.39W N 12.72 W 3.57 252.43N 68.48W N 13.44 W 2.72 294.07N 78.17W N 12.33 W 3.54 340.35N 88.73W N 11.73 W 1.95 390.40N 99.39W 221.95 261.49 304.23 351.71 402.85 2868 2778.55 2730.20 36 48 2962 2852.42 2804.07 39 50 3057 2923.51 2875.16 43 10 3154 2992.81 2944.46 46 16 3248 3056.78 3008.43 47 49 N 11.59 W 3.34 444.05N 110.46W N 12.62 W 3.29 501.15N 122.72W N 13.22 W 3.53 562.45N 136.80W N 12.58 W 3.21 629.35N 152.11W N 13.15 W 1.71 696.34N 167.41W 457.59 515.95 578.84 647.46 716.16 RECEIVED J Alaska Oil UN 1 8 1,996 & ~as Cons. Commission Anchorage SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 BP EXPLORATION (ALASKA) INC. MILNE POINT / MPF-45 500292255600 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 2/95 DATE OF SURVEY: 072595 MWD SURVEY JOB NUMBER: AK-MM-950731 KELLY BUSHING ELEV. = 48.35 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3343 3119.62 3071.27 3437 3180.10 3131.75 3532 3239.00 3190.65 3625 3293.74 3245.39 3721 3345.80 3297.45 49 9 N 12.40 W 1.53 765.58N 183.10W 50 26 N 12.93 W 1.43 835.41N 198.80W 53 0 N 13.38 W 2.72 908.07N 215.79W 55 32 N 16.79 W 4.01 981.50N 235.62W 58 28 N 17.28 W 3.10 1058.17N 259.12W 787.14 858.70 933.31 1009.36 1089.43 3815 3393.48 3345.13 3911 3439.16 3390.81 4005 3482.19 3433.84 4101 3522.32 3473.97 4195 3559.56 3511.21 60 33 N 16.07 W 2.47 1135.78N 282.35W 62 17 N 15.73 W 1.85 1216.46N 305.33W 63 38 N 15.78 W 1.42 1297.63N 328.23W 66 39 N 15.70 W 3.15 1381.01N 351.73W 66 57 N 16.14 W .54 . 1464.59N 375.57W 1170.35 1254.19 1338.49 1425.07 1511.93 4291 3597.18 3548.83 4385 3633.75 3585.40 4483 3668.42 3620.07 4576 3699.97 3651.62 4673 3732.41 3684.06 66 27 N 16.79 W .82 1548.40N 400.34W 68 11 N 16.56 W 1.85 1632.28N 425.47W 70 13 N 16.38 W 2.08 1719.87N 451.36W 69 50 N 16.28 W .43 1803.20N 475.78W 71 5 N 14.75 W 1.97 1891.33N 500.24W 1599.24 1686.70 1777.94 1864.70 1956.13 4767 3763.41 3715.06 4861 3795.06 3746.71 4957 3828.15 3779.80 5052 3861.38 3813.03 5145 3891.57 3843.22 70 37 N 14.05 W .86 1977.83N 522.45W 70 2 N 15.17 W 1.28 2063.50N 544.78W 69 38 N 13.89 W 1.32 2150.75N 567.39W 69 26 N 13.37 W .55 2237.33N 588.39W 72 20 N 12.64 W 3.22 2322.26N 608.00W 2045.43 2133.96 2224.08 2313.18 2400.32 5239 3920.41 3872.06 5334 3949.68 3901.33 5430 3979.49 3931.14 5525 4009.88 3961.53 5620 4041.05 3992.70 72 11 N 12.20 W .47 2410.32N 627.39W 71 55 N 12.06 W .31 2498.71N 646.39W 71 37 N 12.06 W .31 2587.27N 665.31W 71 7 N 12.03 W .54 2675.46N 684.13W 70 29 N 11.81 W .70 2763.07N 702.62W 2490.46 2580.83 2671.34 2761.47 2850.95 5714 4072.91 4024.56 5808 4103.89 4055.54 5903 4133.76 4085.41 5999 4164.09 4115.74 6092 4193.80 4145.45 70 3 N 12.44 W .78 2849.93N 721.28W 71 26 N 11.56 W 1.71 2936.70N 739.72W 71 50 N 12.09 W .68 3024.79N 758.16W 71 31 N 12.43 W .47 3114.32N 777.62W 71 1 N 12.40 W .54 3199.89N 796.46W 2939.75 3028.41 3118.35 3209.93 3297.51 6187 4224.10 4175.75 6282 4254.14 4205.79 6376 4284.01 4235.66 6472 4313.89 4265.54 6567 4342.61 4294.26 71 43 N 13.04 W .98 3287.56N 816.25W 71 41 N 12.86 W .18 3376.12N 836.61W 71 16 N 13.98 W 1.21 3462.87N 857.31W 72 19 N 12.05 W 2.21 3551.42N 877.77W 72 18 N 12.22 W .17 3639.50N 896.71W 3387.37 3478.23 3567.41 3658.29 3748.33 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 BP EXPLORATION (ALASKA) MILNE POINT / MPF-45 500292255600 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 2 INC. /95 DATE OF SURVEY: 072595 MWD SURVEY JOB NUMBER: AK-MM-950731 KELLY BUSHING ELEV. = 48.35 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6627 4360.96 4312.61 6723 4390.60 4342.25 6816 4419.27 4370.92 6909 4448.51 4400.16 7005 4479.34 4430.99 72 11 N 11.98 W .42 3695.57N 908.73W 72 4 N 13.14 W 1.15 3785.32N 928.73W 71 44 N 13.79 W .76 3870.66N 949.16W 71 36 N 14.73 W .97 3956.21N 970.90W 71 0 N 16.26 W 1.64 4044.00N 995.24W 3805.65 3897.58 3985.33 4073.60 4164.66 7098 4509.66 4461.31 7196 4540.61 4492.26 7290 4569.39 4521.04 7385 4598.32 4549.97 7480 4628.43 4580.08 70 52 N 16.64 W .41 4128.18N 1020.10W 72 15 N 16.52 W 1.40 4217.17N 1046.59W 72 17 N 16.96 W .45 4303.37N 1072.52W 72 0 N 16.22 W .80 4389.45N 1098.16W 71 11 N 14.51 W 1.90 4476.76N 1122.16W 4252.35 4345.10 4435.00 4524.72 4615.24 7575 4659.44 4611.09 7670 4690.98 4642.63 7764 4721.97 4673.62 7860 4753.02 4704.67 7956 4784.31 4735.96 70 41 N 15.78 W 1.37 4563.44N 1145.62W 70 20 N 15.07 W .80 4649.39N 1169.33W 71 19 N 14.35 W 1.27 4735.64N 1191.97W 71 2 N 14.03 W .44 4823.98N 1214.31W 70 49 N 14.42 W .45 4911.71N 1236.55W 4705.02 4794.16 4883.31 4974.44 5064.94 8051 4815.29 4766.94 8146 4846.52 4798.17 8240 4878.62 4830.27 8336 4910.68 4862.33 8431 4940.59 4892.24 71 7 N 13.95 W .56 4998.80N 1258.56W 70 24 N 15.13 W 1.40 5085.39N 1281.02W 69 49 N 16.18 W 1.21 5170.84N 1304.96W 71 13 N 15.54 W 1.59 5258.05N 1329.74W 72 0 N 15.36 W .83 5344.77N 1353.71W 5154.76 5244.22 5332.91 5423.52 5513.47 8527 4970.46 4922.10 8622 4999.81 4951.46 8718 5029.69 4981.34 8811 5058.17 5009.82 8905 5085.87 5037.52 71 35 N 15.38 W .42 5432.37N 1377.79W 72 19 N 14.04 W 1.54 5519.55N 1400.67W 71 30 N 14.85 W 1.16 5608.15N 1423.49W 72 50 N 14.56 W 1.46 5693.80N 1445.97W 72 47 N 15.53 W .99 5780.32N 1469.23W 5604.28 5694.41 5785.90 5874.44 5964.02 8997 5113.77 5065.42 9095 5144.17 5095.82 9189 5172.86 5124.51 9280 5200.43 5152.08 9377 5230.05 5181.70 71 59 N 16.09 W 1.04 5864.89N 1493.17W 72 2 N 15.68 W .40 5954.96N 1518.80W 72 15 N 15.91 W .33 6040.70N 1543.06W 72 32 N 16.45 W .64 6124.14N 1567.27W 71 43 N 15.11 W 1.57 6212.56N 1592.26W 6051.86 6145.46 6234.50 6321.33 6413.15 9471 5259.46 5211.11 9565 5288.30 5239.95 9658 5315.34 5266.99 9753 5342.53 5294.18 9848 5370.17 5321.82 71 54 N 14.90 W .29 6299.00N 1615.43W 72 31 N 13.03 W 2.00 6386.22N 1637.11W 73 37 N 12.52 W 1.30 6472.84N 1656.75W 73 11 N 12.69 W .47 6561.92N 1676.67W 72 54 N 13.28 W .67 6650.32N 1697.06W 6502.63 6592.51 6681.31 6772.56 6863.27 RECEIVED dUl~ '1 8 1996 Alaska 011 & 6as Cons. Commission SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA) MILNE POINT / MPF-45 500292255600 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 2 INC. /95 DATE OF SURVEY: 072595 MWD SURVEY JOB NUMBER: AK-MM-950731 KELLY BUSHING ELEV. = 48.35 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 9941 5397.67 5349.32 10036 5426.57 5378.22 10129 5454.50 5406.15 10224 5482.26 5433.91 10315 5508.58 5460.23 COURS INCLN DG MN 72 32 71 59 73 3 73 7 73 3 COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. N 14.12 W .95 6736.22N 1718.00W N 15.69 W 1.68 6823.55N 1741.24W N 15.46 W 1.16 6908.96N 1765.05W N 13.93 W 1.54 6997.28N 1788.21W N 11.97 W 2.07 7081.65N 1807.61W 6951.68 7042.04 7130.68 7221.97 7308.53 10409 5536.50 5488.15 10504 5564.87 5516.52 10598 5592.80 5544.45 10693 5621.28 5572.93 10789 5650.18 5601.83 72 41 72 24 72 58 72 19 72 28 N 14.58 W 2.66 7169.80N 1828.40W N 15.78 W 1.25 7256.87N 1852.03W N 13.74 W 2.17 7343.51N 1874.85W N 14.04 W .74 7432.03N 1896.74W N 13.06 W .99 7520.61N 1918.09W 7399.09 7489.29 7578.87 7670.07 7761.18 10884 5678.16 5629.81 10976 5704.64 5656.29 11071 5732.68 5684.33 11165 5760.89 5712.54 11257 5788.66 5740.31 73 25 72 52 72 47 72 27 72 26 N 10.69 W 2.57 7609.90N 1936.86W N 9.84 W 1.07 7695.92N 1952.44W N 11.33 W 1.50 7785.15N 1969.11W N 11.45 W .37 7873.54N 1986.92W N 11.70 W .26 7959.55N 2004.53W 7852.36 7939.60 8030.23 8120.30 8208.02 11353 5817.69 5769.34 11446 5845.61 5797.26 11541 5873.82 5825.47 11632 5900.76 5852.41 11729 5931.73 5883.38 72 26 72 31 73 0 72 30 70 0 N 11.72 W .02 8049.38N 2023.16W N 12.24 W .54 8135.88N 2041.51W N 12.31 W .52 8224.74N 2060.84W N 12.35 W .55 8309.56N 2079.38W N 11.43 W 2.76 8398.85N 2098.19W 8299~70 8388.07 8478.97 8565.76 8656.95 11824 5966.00 5917.65 11920 6003.19 5954.84 12016 6042.30 5993.95 12110 6083.99 6035.64 12203 6126.10 6077.75 67 41 66 58 64 37 63 8 62 46 N 12.07 W 2.51 8485.56N 2116.22W N 11.50 W .92 8572.73N 2134.41W N 12.25 W 2.56 8657.87N 2152.31W N 12.93 W 1.70 8740.88N 2170.84W N 13.60 W .75 8821.17N 2189.77W 8745.45 8834.44 8921.39 9006.42 9088.90 12293 6167.64 6119.29 12392 6215.33 6166.98 12489 6263.50 6215.15 12580 6310.36 6262.01 12676 6361.31 6312.96 61 57 60 49 59 33 58 27 57 15 N 17.79 W 4.25 8897.52N 2211.21W N 21.57 W 3.52 8979.81N 2240.63W N 24.72 W 3.11 9057.10N 2273.65W N 25.14 W 1.27 9127.86N 2306.54W N 25.83 W 1.40 9201.04N 2341.42W 9168.17 9255.12 9338.08 9414.67 9494.09 12771 6414.62 6366.27 12868 6472.09 6423.74 12900 6492.08 6443.73 12931 6511.32 6462.97 12963 6531.29 6482.94 54 54 52 2 51 28 51 30 51 42 N 25.98 W 2.46 9272.34N 2376.05W N 26.64 W 3.01 9341.88N 2410.42W N 26.13 W 2.13 9364.61N 2421.70W N 25.99 W .36 9386.33N 2432.32W N 23.93 W 5.06 9409.17N 2442.95W 9571.63 9647.40 9672.17 9695.81 9720.54 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA) MILNE POINT / MPF-45 500292255600 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 2 INC. /95 DATE OF SURVEY: 072595 MWD SURVEY JOB NUMBER: AK-MM-950731 KELLY BUSHING ELEV. = 48.35 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 12996 6551.70 6503.35 51 31 N 22.83 W 2.67 9432.82N 2453.17W 13027 6571.08 6522.73 50 39 N 23.48 W 3.26 9454.89N 2462.61W 13059 6591.51 6543.16 49 46 N 22.90 W 3.12 9477.45N 2472.28W 13090 6612.02 6563.67 48 58 N 23.26 W 2.68 9499.43N 2481.64W 13122 6632.83 6584.48 47 28 N 22.06 W 5.56 9520.93N 2490.62W VERT. SECT. 9745.95 9769.65 9793.87 9817.46 9840.49 13153 6654.81 6606.46 45 24 N 22.41 W 6.57 9542.33N 2499.37W 13186 6678.11 6629.76 43 0 N 20.84 W 8.12 9563.39N 2507.72W 13217 6701.45 6653.10 41 3 N 19.02 W 7.29 9583.16N 2514.90W 13248 6724.76 6676.41 39 13 N 16.91 W 7.50 9601.85N 2520.97W 13278 6748.03 6699.68 38 0 N 14.74 W 6.12 9619.73N 2526.04W 9863.36 9885.81 9906.73 9926.33 9944.90 13311 6774.80 6726.45 37 0 N 15.42 W 3.18 9639.56N 13343 6799.72 6751.37 36 46 N 14.08 W 2.69 9657.65N 13374 6825.21 6776.86 37 1 N 14.01 W .76 9676.22N 13405 6849.89 6801.54 37 6 N 11.10 W 5.68 9694.41N 13500 6924.74 6876.39 37 52 N 8.06 W 2.12 975t.00N 2531.38W 9965.44 2536.14W 9984.14 2540.79W 10003.28 2544.84W 10021.91 2554.38W 10079.14 13592 6998.50 6950.15 35 52 N 5.97 W 2.55 9805.90N 13683 7072.42 7024.07 35 12 N .96 W 3.29 9858.57N 13778 7150.21 7101.86 35 43 N .33 W .66 9913.99N 13874 7227.50 7179.15 35 50 N .97 W .42 9969.69N 13969 7304.11 7255.76 37 1 N .53 W 1.27 10026.25N 2561.16W 10134.06 2564.37W 10185.95 2564.99W 10239.89 2565.62W 10294.11 2566.36W 10349.19 14063 7379.06 7330.71 37 50 N .27 W .88 10083.63N 14125 7427.84 7379.49 38 8 N .69 W .63 10121.74N 14220 ~502.09 7453.74 38 8 N .69 W .00 10180.04N 2566.76W 10404.98 2567.08W 10442.04 2567.78W 10498.80 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION.MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 10498.89 FEET AT NORTH 14 DEG. 9 MIN. WEST AT MD = 14220 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 346.08 DEG. RECEIVED Alaska Oil & Gas Cons. Co.mmlssion r~,r ~,~ _~ SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA) INC. MILNE POINT / MPF-45 500292255600 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 2/95 DATE OF SURVEY: 072595 JOB NUMBER: AK-MM-950731 KELLY BUSHING ELEV. = 48.35 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -48.35 .00 N .00 E 1000 999.96 951.61 3.40 S 3.61 W 2000 1991.56 1943.21 105.04 N 34.66 W 3000 2881.10 2832.75 525.03 N 128.12 W 4000 3479.59 3431.24 1292.59 N 326.81 W .00 .04 .04 8.44 8.40 118.90 110.47 520.41 401.50 5000 3842.87 3794.52 2189.27 N 576.92 W 6000 4164.18 4115.83 3114.57 N 777.68 W 7000 4477.57 4429.22 4039.08 N 993.80 W 8000 4798.60 4750.25 4951.51 N 1246.78 W 9000 5114.59 5066.24 5867.32 N 1493.87 W 1157.13 636.72 1835.82 678.69 2522.43 686.61 3201.40 678.97 3885.41 684.01 10000 5415.41 5367.06 6790.48 N 1731.95 W 11000 5711.65 5663.30 7718.34 N 1956.33 W 12000 6035.39 5987.04 8643.65 N 2149.22 W 13000 6553.85 6505.50 9435.31 N 2454.22 W 14000 7328.62 7280.27 I0044.74 N 2566.53 W 4584.59 699.19 5288.35 703.76 5964.61 676.25 6446.15 481.55 6671.38 225.23 14220 7502.09 7453.74 10180.04 N 2567.78 W 6717.91 46.53 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 7 BP EXPLORATION (ALASKA) INC. MILNE POINT / MPF-45 500292255600 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 2/95 DATE OF SURVEY: 072595 JOB NUMBER: AK-MM-950731 KELLY BUSHING ELEV. = 48.35 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -48.35 48 48.35 .00 148 148.35 100.00 248 248.35 200.00 348 348.35 300.00 .00 N .00 E .00 .00 N .00 E .00 .00 .37 N .03 W .00 .00 .80 N .18 W .00 .00 1.01 N .45 W .00 .00 448 448.35 400.00 548 548.35 500.00 648 648.35 600.00 748 748.35 700.00 848 848.35 800.00 1.26 N .81 W .00 .00 1.12 N 1.21 W .01 .00 .52 N 1.45 W .01 .00 .71 S 1.80 W .02 .01 2.15 S 2.42 W .03 .01 948 948.35 900.00 1048 1048.35 1000.00 1148 1148.35 1100.00 1248 1248.35 1200.00 1348 1348.35 1300.00 1449 '1448.35 1400.00 1550 1548.35 1500.00 1651 1648.35 1600.00 1752 1748.35 1700.00 1854 1848.35 1800.00 3.32 S 3.26 W 3.15 S 3.96 W 1.26 S 4.86 W 2.50 N 6.08 W 9.02 N 7.39 W 30.95 N 12.19 W 45.65 N 16.49 W 62.54 N 21.66 W 79.71 N 26.94 W .04 .01 .04 .00 .07 .02 .15 .08 .39 .23 .88 .50 1.68 .80 2.86 1.18 4.41 1.55 6.01 1.60 1955 1948.35 1900.00 2057 2048.35 2000.00 2160 2148.35 2100.00 2265 2248.35 2200.00 2372 2348.35 2300.00 97.05 N 32.27 W 7 115.81 N 37.84 W 9 139.45 N 44.37 W 12 169.06 N 51.26 W 17 205.32 N 58.77 W 23 .64 1.63 .54 1.90 .51 2.97 .05 4.54 .70 6.65 2481 2448.35 2400.00 2593 2548.35 2500.00 2710 2648.35 2600.00 2830 2748.35 2700.00 2957 2848.35 2800.00 248.49 N 67.60 W ' 33 298.72 N 79.27 W 45 356.72 N 92.31 W 61 422.45 N 106.02 W 82 497.86 N 121.99 W 108 .00 9.30 .54 12.54 .90 16.36 .37 20.47 .65 26.29 3091 2948.35 2900.00 3236 3048.35 3000.00 3387 3148.35 3100.00 3547 3248.35 3200.00 3726 3348.35 3300.00 585.62 N 142.19 W 687.27 N 165.29 W 798.15 N 190.29 W 920.25 N 218.78 W 1062.15 N 260.35 W 143.27 187.75 239.15 299.56 378.15 34.62 44.48 51.41 60.40 78.59 SP~:RRY-SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE BP EXPLORATION (ALASKA) INC. MILNE POINT / MPF-45 500292255600 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 2/95 DATE OF SURVEY: 072595 JOB NUMBER: AK-MM-950731 KELLY BUSHING ELEV. = 48.35 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3930 3448.35 3400.00 4167 3548.35 3500.00 4425 3648.35 3600.00 4722 3748.35 3700.00 5015 3848.35 3800.00 1233.31 N 310.08 W 1439.27 N 368.25 W 1667.39 N 435.90 W 1936.30 N 512.05 W 2203.51 N 580.34 W 482.58 104.44 618.90 136.31 777.02 158.12 973.90 196.88 1167.29 193.39 5330 3948.35 3900.00 5641 4048.35 4000.00 5949 4148.35 4100.00 6264 4248.35 4200.00 6586 4348.35 4300.00 2494.72 N 645.53 W 2783.23 N 706.84 W 3068.21 N 767.49 W 3359.05 N 832.71 W 3657.09 N 900.52 W 1382.08 214.79 1593.53 211.45 1801.61 208.09 2016.01 214.39 2237.65 221.64 6908 4448.35 4400.00 7221 4548.35 4500.00 7541 4648.35 4600.00 7846 4748.35 4700.00 8151 4848.35 4800.00 3955.76 N 970.78 W 4240.34 N 1053.46 W 4532.96 N 1137.00 W 4810.79 N 1211.01 W 5090.37 N 1282.36 W 2460.39 222.74 2673.20 212.80 2893.57 220.37 3098.00 204.44 3303.39 205.39 8456 4948.35 4900.00 8778 5048.35 5000.00 9109 5148.35 5100.00 9435 5248.35 5200.00 9773 5348.35 5300.00 5367.81 N 1360.04 W 5663.07 N 1437.99 W 5967.37 N 1522.29 W 6266.16 N 1606.69 W 6580.72 N 1680.91 W 3508.40 205.01 3729.76 221.35 3960.99 231.24 4187.20 226.21 4425.58 238.37 10108 5448.35 5400.00 10449 5548.35 5500.00 10783 5648.35 5600.00 11124 5748.35 5700.00 11455 5848.35 5800.00 6889.52 N 1759.67 W 7206.56 N 1837.99 W 7514.98 N 1916.78 W 7834.64 N 1979.04 W 8144.39 N 2043.36 W 4659.65 234.07 4901.27 241.62 5134.98 233.70 5375.71 240.73 5607.50 231.79 11777 5948.35 5900.00 12030 6048.35 6000.00 12251 6148.35 6100.00 12459 6248.35 6200.00 12652 6348.35 6300.00 8443.28 N 2107.20 W 8670.35 N 2155.02 W 8862.57 N 2200.69 W 9033.41 N 2262.99 W 9182.91 N 2332.64 W 5829.14 221.64 5981.89 152.75 6103.37 121.48 6211.03 107.66 6303.93 92.90 12829 6448.35 6400.00 12991 6548.35 6500.00 13144 6648.35 6600.00 13278 6748.35 6700.00 13403 6848.35 6800.00 9314.04 N 2396.54 W 9428.93 N 2451.53 W 9536.26 N 2496.86 W 9619.96 N 2526.10 W 9693.26 N 2544.62 W 6380.85 76.92 6442.81 61.97 6496.42 53.60 6530.23 33.81 6555.61 25.38 SPERRY-SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE BP EXPLOP._ATION (ALASKA) INC. MILNE POINT / MPF-45 500292255600 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 2/95 DATE OF SURVEY: 072595 JOB NUMBER: AK-MM-950731 KELLY BUSHING ELEV. = 48.35 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 13530 6948.35 6900.00 9769.18 N 2556.95 W 6581.78 13653 7048.35 7000.00 9841.53 N 2563.81 W 6605.43 13776 7148.35 7100.00 9912.65 N 2564.98 W 6628.14 13899 7248.35 7200.00 9984.76 N 2565.87 W 6651.44 14024 7348.35 7300.00 10059.78 N 2566.65 W 6676.45 26.17 23.64 22.72 23.29 25.02 14151 7448.35 7400.00 10137.85 N 2567.27 W 6703.32 14220 7502.09 7453.74 10180.04 N 2567.78 W 6717.91 26.87 14.59 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS RECEIVED JUN I 8 Alaska Oil & Gas C, er,.s. LARRY GRANT Attn. ALJtSKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 12 January 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: 'MPF-45 -~ ~-/~ DESCRIPTION CCL FINAL BL+RF Run # 1 ECC No.. 6472.02 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline ServiCes 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX tQ/~907) 563-7803 MEMORANDUM TO: State of Alaska Alaska Oil and Gas Conservation Commission DATE: January 5, 1996 THRU: Blair Wondzell, P. !. Supervisor FROM: Lou Grimaldi, ~.¢~ SUBJECT: Petroleum Inspector FILE NO: AW9JAEDD.doc BOPE Test, Nabors 4ES BPX, Milne Point Unit Well MPU F-45 PTD #95-58 Friday, January 5, 1996: I traveled to BPX's Miine Point Unit to witness a BOPE test on Nabors 4ES completing a new well #MPU F-45 I arrived at 0200 AM and the test got underway immediately and ended approximately 0830 in the morning. There were 3 valves on the choke manifold failed to hold their pressure test. These valves were greased, cycled and retested. Two of the valves failed their retests and were changed out after the test was over. The Methane and H2S detectors were out of calibration and although most registered a'alarm, for the most part they were inconsistent. These were calibrated and worked well afterwards. ! had made a Rig\BOPE inspection on the previous Wednesday (see QVV9JACDD.DOC) and found some non-compliance threaded connections on the BOP stack. These have been replaced with b!ind flanges and gate valve a__Errangements. Summary: I witnessed a BOPE test on Nabors 4ES completing a new well #MPU F-45. The test lasted 7 hours and there were 5 failures. Attachment: AW9JAEDD.XLS STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Drlg Contractor: Operator: Well Name: Casing Size: 7 Test: Initial X Workover: Nabors Rig No. 4ES PTD Cf BPX Rep.: F-45 Rig Rep.: Set @ Location: Sec. Weekly Other DATE: 1/5/96 95-58 Rig Ph.Cf 659-6475 Larry Meyers Dan Hebert 6 T. 13N R. 'ICE Meridian Umiat TEST DATA MISC. INSPECTIONS: Location Gen.: P Housekeeping: P (Gen) PTD On Location P Standing Order Posted P BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Well Sign P Drl. Rig P Hazard Sec. P Quan. Test Press. P/F 1 250/5,000 P 1 250/5,000 P N/A 250/5,000 N/A I 250/5, 000 P I 250/5,0O0 P 2 250/5,000 P ~ 250/5,000 P N/A 250/5, 000 N/A MUD SYSTEM: Visual Alarm Trip Tank P P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector F F H2S Gas Detector F F FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Test Quan. Pressure P/F note 250/5,000 note 250/5,000 ~ 250/5,000 p ~ 250/5,000 p CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes 12 Test Pressure 25O/5,000 P/F 28 250/5,000 Functioned Functioned ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: Fourbo~les 3,000 P 1,900 P minutes 35 sec. minutes 39 sec. P Remote: P avenge 2000 Psig. .TEST RESULTS Number of Failures: 5 ,Test Time: Hours. Number of valves tested 16 Repair or Replacement of Failed Equipment will be made within Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: #2, Cf3 & cf4 valves on choke manifold leaked, greased and retested. Cf2 &Cf3still leaked. H2S & Methane detectors out of calibration, recalibrate and notify inspector for retest. note: Kelly not needed, Test if picked up(notify inspector beforehand) Distribution: orig-Well File c - Oper./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X' NO 24 HOUR NOTICE GIVEN YES X' NO Waived By: Witnessed By: Louis R, Grirnaldi FI-021L (Rev. 12/94) AW9JAEDD.XLS EIRII_I_IIM G ~ER~/ICE~=;· WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn: Lar~y Grant 3001 Porcupine Drive Anchorage, Alaska 99501 November 17, 1995 RE: MWD Fort-nation Evaluation Logs - MP F-45, AK-MM-950731 The teclmical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 MPF-45: 2"x 5" MD Resistivity and Gamma Ray Logs' 2" x 5" TVD Resistivity and Gamma Ray Logs: 1 Blueline 1 Rev. Folded Sepia 1 Blueline 1 Rev. Fol~led Sepia 2" x 5" .MD Neutron and Density Logs: 1 Blueline 1 Rev. Folded Sepia 2" x 5" TVD Neutron and Density Logs: 1 Blueline 1 Rev. Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, ~99501. Date: 21 September 1995 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL MPJ-09 MPF-61 MPL-12 DESCRIPTION PLa FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF ECC No. Run # 1 6258.04 Run # 1 Run # 1 6472.01 Run # 1 6480.00 Run # 1 6482.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Anchorage, ~ 99518 :~~ Or F~ to (907) Received by _ ~~ Date: Please sign and return Petrotechnical Data Cente~ BP Exploration (Alaska) InS 900 East Benson Boulevard ... Anchorage, Alaska 9950~ ~eceived'b~'" LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 24 August 1995 RE: Transmittal of Data Sent by: ANCH.EXPRESS Dear Sir/Madam, Enclosed, please find the data as described below: .......... _ .:-.~un ...... - ..... :X:--_~; .... '. ' __.~i-~ .... ~ - : Atlas Wireline Services .;,:~ .-'-....- ..: .;;- ~/~ -. :::<~-. .- : _~ _ . ; -. .. :!,!.,~- :.. -..... .. ..-~ . ' 5600 B Street ~ .... . ' . ~-.1._.-; :: : - . .., ...... Suite 201 ...... - _ ~chorage, ~ 99518 ._ /~,:~ ....... _,' _.:. . ~ F~ to (907) 563-7803 ~ Oi~ & Gas b~ ............ SSIO.' ~_~~ ' ., ~ch0~ge Received by: ~_~_/ Date LARRY GRANT Date: Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE RE= Transmittal of Data .. ..... .. ANCHOP~GE "- ' ::: ':~ "-'- ' ~, 99501 Sent by: ~ ~Y ....... _.. Dear Sir/Made, _- .- . ~ ~.~.~ .~ ..... .~..~ -- . -..-. - .- ..- -' -~ - _ ..... . .......... ':.,-- -,:-L'--i . '- '-. -~-'-"--', :~: -"':::~:~".:~ ::..:J~'WELL '~ . ":~v< ':::?~:~-~'-~/~=~ o_ _:'~.-;'"-.. . .'.- . :: .:- ?: ~:=i: ' ....... . . . "-"-Please sign and return to: Attn Rodney D Paulson Atlas Wireline So.ices --- .... 5600 B Street . ....--' . 3: .- Suite 201 ......... Anchorage, AK 99518 · . b~~_~ Or FAX to (907) 563-7803 Received .~~'~'"~~--~--'""~' Date: · .- ' .. SE? 1 1995 Alaska 0il & Gas Cods. uummlaaton . Anchorage '"~;: .... · ....-..,.:... ~. ._.. :- MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: FROM: David Joh~ Chairman "'"~'~-~ Blair Wondzell, ..~'J,~..~ P. i. Supervisor Bobby Foster, ~'~'~ Petroleum Inspector" DATE: July 20, 1995 FILE NO: SUBJECT: AWQIGTCD:doc BOPE Test - Nabors 27E BPX - MPU - F-45 PTD # 95-0058 Miine Point Field Thursday, July 20, 1995: I received a call from Jim Gaffeney, BPX drilling rep., at 5:45 AM this date informing me that he had forgotten to give me notification of the BOPE test and he was ready to test. I informed Jim that I would be to the rig as soon as I could and that I would require a full test. I arrived at the rig,on the rig floor at 8:00 AM. The crew had already began testing and had found that the HCR valve on the choke line side was leaking a small amount. The test was shut down and the valve was greased and the test was started over. As the AOGCC BOPE Test Report shows/all components were tested with the exception of the upper and lower kelly valves while I was on the-rig floor. The crew had racked drill pipe so that the kelly could not be picked up without moving a lot of pipe. I agreed to let them test the valves when they got in the hole to the casing shoe. The rig was clean and ali equipment seemed to be in good working order. The extra drilling equipment on the pad was stored properly at various areas on the pad due to on going construction work on the pad. While i was at the rig I discussed the diverter line routing with Jim and Brian Busby, Nabors toolpusher, to see if we could get the ninety degree turns out of it. The best solution we came up with was to go straight through the pipe shed with it, which would make the line 150' + long but would make it safer for all personal. BPX and Nabors reps. in Anchorage are studying the problem and will make a decision soon. Summary: I witnessed the BOPE Test on Nabors rig 27E on BPX's MPU well F-45 - test time 2.5 hours - no failures. Attachment:: AWQIGTCD.XLS STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover: Drlg Contractor: NABORS Rig No. Operator: BPX Well Name: MP F-45 Casing Size: 9.625" Set @ 6,678' Test: Initial Weekly X Other 27E PTD # Rep.: Rig Rep.: Location' Sec. 95-0058 DATE: JULY 20,1995 Rig Ph.# 659-4373/84 JIM GAFFENEY BRIAN BUSBY 6 T. 13N R. IOE Meridian UM Test aiSC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location YES Standing Order Posted YES Well Sign OK Drl. Rig OK Hazard Sec. OK FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Quan. Pressure P/F NOTE NOTE 1 500/5,000 P 1 500/5,000 P BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. P/F 1 P 300/3,500 I 500/5,000 P f 500/5,000 P I 500/5,000 P I 500/5,000 P 2 500/5,000 P I 500/5,000 P N/A CHOKE MANIFOLD: No. Valves 16 I No. Flanges 42 Manual Chokes 1 Hydraulic Chokes 1 Test Pressure P/F 500/5,000 P 500/5,000 P P Functioned Functioned ACCUMULATOR SYSTEM: System Pressure 3,000 P Pressure After Closure 1,350 P MUD SYSTEM: Visual Alarm 200 psi Attained After Closure 0 minutes 25 TripTank YES OK System Pressure Attained 1 minutes 37 Pit Level Indicators YES OK Blind Switch Covers: Master: YES Remote: Flow Indicator YES OK Nitgn. Btl's: 8 ~2400 avg. Meth Gas Detector YES OK Psig. H2S Gas Detector YES OK sec. sec. YES Number of Failures: 0 ,Test Time: 2.5 Hours. Number of valves tested 22 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: The methane gas detector in the pits had to be adjusted a small amount. NOTE: The Upper and lower kelly valves will be tested after going in the hole to the casing shoe - the kelly could not be picked up without moving some of the drill pipe racked in derrick. Distribution: orig-Well File c - Oper./Rig c - Database c - Trip Rpt File c- InsP~l~¥L (Rev. 12/94) STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES NO X Waived By: Witnessed By: GTCD.XLS BOBBY D. FOSTER MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: David John~s't~ Chairman DATE: July 8, 1995 THRU: Blair Wondzell, ¢.¢.0.,.' FILE NO: P. I. Supervisor FROM: John Spauldin¢~ SUBJECT: Petroleum Insp. ice EWQLGHCD.doc Diverter Function Test Nabors 27E BPX MPU well MPF-45 PTD 95-58 Saturday July 8, 1995: I witnessed the Diverter Function Test on Nabors 27E at Milne Point 'Unit well MPF-45. The AOGCC Diverter Function Test report is attached for reference. , The 10" vent line is 33' from the divert valve to a targeted "T" near the pipe shed, from the targeted "T" to the open end of the vent line is 72'. The vent line is bifurcated approximately 20' from the open end and has 2 valves at this location 1 normally open and 1 normally closed. The bifurcated section of line extends 60' + - down the side of the pipe shed. The vent line is anchored down with braces from the pipe shed every 20' in it's entirety. The nearest ignition source is 97' to a Tioga air heater (see attached drawing). Summary: I witnessed the Diverter Function Test on Nabors 27E BPX Miine Point Unit, with no failures. Attachments: EWQLGHCD.XLS Photos STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Diverter Systems Inspection Report Operation: Development X Exploratory: Drlg Contractor: Nabors Rig No. 27E PTD # 95-58 Rig Ph. # Operator: BP Exploration Oper. Rep.: Jim Gaffney Well Name: MPF-45 Rig Rep.: Rod Klepsig Location: Sec. 6 T. 13N R. 10E Merdian Umiat 659-4373 MISC. INSPECTIONS: ACCUMULATOR SYSTEM: Location Gen.: ok Well Sign: ok Systems Pressure: 2800 psig Housekeeping: ok (Gen.) Drlg. Rig: ok Pressure After CIosure: 1400 psig Reserve Pit: na Flare Pit: na 200 psi Attained After Closure: ~min. 18 sec. Systems Pressure Attained: 1 min. 53 sec. Nitrogen Bottles: 4 ea. 2300 avg. DIVERTER SYSTEM INSPECTION: Diverter Size: 20 in. Divert Valve(s) Full Opening: 1 Valve(s) Auto & Simultaneous: yes Vent Line(s) Size: 10 in. :Vent Line(s) Length: 105 ft. Line(s) Bifurcated: yes Line(s) Down Wind: yes Line(s) Anchored: yes Tums Targeted / Long Radius: yes MUD SYSTEM INSPECTION: Light Alarm Trip Tank: ok ok Mud Pits: ok ok Flow Monitor: ok ok GAS DETECTORS: Light Alarm Methane ok ok Hydrogen Sulfide: ok ok psig North ,~,Tioga air heater __ 97' I I -'"ignition source 10" bifucated line 60' + - 10" divert line 72' from targeted "T" 2 valves 1 open, 1 closed 10"d~vert valve ~~ 20,-ainnular~ Pipe Shed ~) 10" divert line 33' to targeted "T" Sub-Structure Motors & Pits Wind direction Nabors 27E Distribution orig. - Well File c - Oper/Rep c- Database c - Trip Rpt File c-Insr~ct~22 AOGCC REP.: OPERATOR REP.: EWQLGHCD.XLS John H. Spaulding Rod Klepsig ALASKA OIL AND G~S C~ ONSERVATIO~ COMMISSION TONY KNOWLE$, (~OVEI~NOFt 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA g9501-3192 PHONE: (907) 27'9-1433 FAX: (gO7} 276-'/542 April 27, 1995 Adrian Clark Drilling Engineer Supervisor BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re .' Milne Point Unit MPF-45 BP Exploration (Alaska), Inc. Permit No: 95-58 Sur. Loc. 1979'NSL, 2608'WEL, Sec. 6, T13N, RiOE, UM Btmhole Loc. 1667'NSL, 5108'WEL, Sec. 30, T14N, R10E, UM Dear Mr. Clark: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field  t 659-3607. · . David W. ~Johnston Chairman ~ BY ORDER OF THE--IIOMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.OO5 la. Typeofwork Drill [] Redrilll-illb. TypeofwelI. ExploratoryE3 Stratigraphic TestF1 DevelopmentOil[] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 46' feet Milne Point- Kuparuk River 3. Address 6. Property Designation P. O. Box 196612, Anchoracle, Alaska 99519-6612 ADL 355018 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 2o AAC 25.025) 1979' NSL, 2608' WEL, SEC. 6, T13N, RIOE Milne Point Unit At top of productive interval 8. Well number Number 1407' NSL, 5043' WEL, SEC. 30, T14N, RIOE MPF-45 2S100302630-277 At total depth 9. Approximate spud date Amount 1667' NSL, 5108' WEL, SEC. 30, T14N, RIOE 4/27/95 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and TVD) property line ADL 355016-3613' feet No close approach feet 2560 14186' MD/7405' TYD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 8co feet Maximum hole angle z2 o Maximum sudace 2828 psig At total depth (TVD) 7085/3536 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.1# NTSOLHE Weld 80' 32' 32' 112' 112' 250 sx Arcticset I (Approx.) 12-1/4" 9-5/8" 40# L-80 BTRC 6675' 31' 31' 6706' 4377' 1255 sx Pr "E"/250 sx "G"/250 sx PF "E" 8-1/2" 7" 26# L-80 BTRC !14156' 30' 30' 14186' 7405' 220 SX Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECEIVED Surface Intermediate Production APR 2. 4 1995 Liner Perforation depth: measured ~$~r~ {,)il.& Gas Cons. Commission true vertical ', ;~ch0rag.,, 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program//[] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby certify~h~t t~e .fcregoin¢is true and correct to the best of my knowledge Signed ~ Commission Use Only Permit Number APl number Approval date See cover letter n~ss~<'-- ~/'*~ 50-O~--9- .Z.-2_...¢",~ ..Z/¢....~-) .. ¢'- ~" for other requirements Conditio of approval Samples required [] Yes [] No Mud Icg required []Yes .1~ No Hydrogen sulfide measures [] Yes ~ NO Directional survey required ~ Yes [] NO Required working pressure for DOPE []2M; []3M; ~5M; I--IIOM; I-I15M; Other: Original Signed By by order of Approved by David W. Johnston Commissioner ~ne comm,ssion Date Form 10-401 Rev. 12-1-85 Submit i~ cate [Well Name: l MPF-45 Well Plan Summary I Type of Well (producer or injector): I KuparukProducer I Surface Location: 1979' FSL 2608' FEL Sec 06 T13N R10E UM., AK. Target Location: 1407' FSL 5043' FEL Sec 30 T14N R10E UM., AK. Bottom Hole 1667' FSL 5108' FEL Sec 30 T14N R10E UM., AK. Location: I AFE Number: 1330127 I I Estimated Start Date: I April 27'1995 I Rig: I Nabors 27E I I Operating days to drill 17 and case: I TVD: 17405' I 146' IWell Design (conventional, slimhole, etc.): Formation Markers: IUltra Slimhole, 7" Longstring Formation Tops MD TVD Formation Pressure/EMW base permafrost 1801' 1795' n/a MA n/a n/a n/a NA (Top Schrader) 5633' 4045' 1687 psig / 8.0 ppg 'OA 5956' 4145' 1725 psig / 8.0 ppg Base Schrader Bluff 6506' 4315' 1795 psig/8.0ppg 'Top HRZ 12870 6635 n/a Base HRZ 12997' 6725' n/a Kupark D Shale 13544' 6925' n/a Top Kuparuk A 13769' 7085' 3536 psig / 9.6 ppg Target 13769' 7085' 3536 psig / 9.6 ppg Total Depth 14186' 7405' n/a Casing/Tubing Pro,: ;ram: Hole Csg/ Wt/Ft Grade Con Length Top Btm Size Tbg n MD/TVD MD/TVD O.D. 30" 20" 91.1# NT80LHE weld 80 32/32 112/112 12 1/4" 9 5/8" 40# L-80 btrc 667 5' 31/31 6706/4377 8 1/2" 7" 26# L-80 btrc 14156' 30/30 14186/7405 N/A (tbg) 2-7/8" 6.5# L-80 EUE 13471' 29/29 13500/6825 8rd i. _-__-- .-~_ _~ ? .~,. REE iv u APR 2 4 199,5 .Oil .& Gas Cons. Commission Ancl~oraq., Internal yield pressure of the 7" 26# casing is 7240 psi. Worst case surface pressure would occur with a full column of gas to the reservoir at 7085' TVDSS. Maximum anticipated surface pressure in this case assuming a reservoir pressure of 3536 psi is 2828 psi, well below the internal yield pressure rating of the 7" casing. Logging Program: l Open Hole Logs: Surface Intermediate Final Cased Hole Logs: None GR/Resistivity None LWD GR/Resistivity/Neutron/Density None A gamma ray log will be obtained from surface to TD. Mud Logging is not required. Mud Program: ISpecial design considerations None- LSND freshwater mud Surface Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.6 50 15 8 10 9 8 to to to to to to to 9.6 90 35 15 30 10 15 Intermediate Mud Properties: N/A I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Production Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.0 40 10 3 7 8.5 6-8 to to to to to to to 10.2 50 15 10 20 9.5 4-6 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: I KOe: 18oo' Maximum Hole Angle: Close Approach Well: 72 degrees None I There are no close approach wells for drilling MPF-45. Disposal: Cuttings Handling: CC2A Fluid Handling: The other wells on this pad are MPF-01, MPF-25, MPF-13, MPF-37 and MPF-46 (No. Point #1). MPF-46 has had it's annulus arctic packed making it unavailable for injection. Consequently the only annulus available for annular injection will be the 9-5/8" x 7" annulus on MPF-01, MPF-25, MPF-13 and MPF-37. The PEs may be perforating and fracing any of the wells on this pad while MPF-45 is being drilled. Check with the PE supervisor prior to injecting waste fluid down any other annulus to ensure injection will not interfere with their operations. After cementing the 7" casing on this well, MPF-45, and allowing the cement to cure 6 hours the annulus may be used for fluid disposal. Ensure the annulus is freeze protected after injecting any freezable fluids. Annular Injection: All cuttings from this well (MPF-45) will require trucking to CC2 for processing and disposal. Fluids may be injected into the 7" x 9-5/8" annulus on MPF- 01, MPF-25, MPF-13 and MPF-37. MPF-45's annulus may be used after allowing the cement on the 7" casing cement job to cure 6 hours following CIP. AREA WELL PREV VOL PERMITTED PERMITTED DATES INJECTED (BBL) VOL (BBL) Milne Point F-25 0 35,000 1/1/95-1'2/31/95 Milne Point F-13 0 35,000 1/1/95-12/31/95 Milne Point F-37 0 35,000 1/1/95-12/31/95 FREEZE PROTECTION: Pay close attention to annulii being used for disposal so to avoid freezing. Sometimes the annulii are kept open by ensuring that an adequate volume (+60 bbls) is injected every 6-12 hours. This practice is more economical than pumping 60 bbls of diesel freeze protection every time the pumps are shut down; however, if this practice is used, it is important that the injection frequency into the annulus be adequate to prevent freeze ups -- the drillers must communicate to each other the last time the annunlus was injected into to avoid freezing. RECEIVED APR 2. 4 1995 Oil & Gas CODS. Commission Anchora MP F-45 Proposed Summary of Operations . . 3. 4. 5. , , 10. 11. 12. 13. 14. 15. 16. 17. Drill and Set 20" Conductor. Weld an FMC landing ring for the FMC Gen 5 Weelhead on the conductor. Prepare location for rig move. MIRU Nabors 27E drilling rig. NU and function test 20" Diverter system. Build Spud Mud. Drill a 12-1/4" surface hole to 6706' md (4377' tvd). (Note: This hole section will be LWD logged with GR/Res). Run and cement 9-5/8" casing. ND 20" Diverter, NU and Test 13-5/8" BOPE. Run Wear Bushing. RIH w/PDC bit and PDM (motor). Test the 9-5/8" casing to 3500 psig. Drill out float equipment and 10 feet of new formation, Perform a LOT. Drill 8-1/2" hole to TD at 14186' MD (7405' TVD). (Note: This hole section will be logged LWD with Triple Combo (GR/Res/Neu/Dens). Pull Wear Bushing, and Change Pipe Rams to 7". Run and Cement 7" casing. Test casing to 3500 psi and freeze protect wellbore to 2000' TVD with diesel. ND BOPE and NU dry hole tree. Release rig to MPL-29i. Note: This well will be perforated, hydraulically fractured and cleaned out with coiled tubing without a rig and prior to running the ESP completion. Following the stimulation the well will be left with a retrievable bridge plug (RBP) set 500' above the perforations and 'kill weight brine in the wellbore. MIRU workover completion unit. ND dry hole tree. NU BOPs and test. PU and RIH with 2-7/8" EUE 8rd tubing with RBP retrieving tool. Release RBP and POH standing back tubing. RIH with Electric Submersible Pump (ESP) completion on 2-7/8" EUE 8rd tubing. Set BPV. ND BOPE and NU tree. Pull BPV and set two way check. Test tree. RDMO with workover/completion rig. MPF-45 WELL 9-5/8" SURFACE CASING CEMENT PROGRAM - HALLIBURTON CASING SIZE: 9-5/8" CIRC. TEMP 80 deg F at 4000' TVDSS. SPACER: 75 bbls fresh water. R ECE'IVED LEAD CEMENT TYPE: Type E Permafrost APE 2 4 1995 ADDITIVES: Retarder ~o~ka Oil & (las Cons. Commission Anchor~, ',~ WEIGHT: 12.0 ppg YIELD: 2.17 ft3/sx MIX WATER: 11.63 gal/sk APPROX #SACKS: 1255 THICKENING TIME: Greater than 4 hrs at 50° F. TAIL CEMENT TYPE: Premium G ADDITIVES: 0.2% CFR-3, 0.2% Halad-344, 2.0% CaC12 WEIGHT: 15.8 ppg APPROX #SACKS: 250 FLUID LOSS' 100-150 cc YIELD: 1.15 ft3/sx MIX WATER: 5.0 gal/sk THICKENING TIME: Greater than 4 hrs at 50° F. FREE WATER: 0 TOP JOB CEMENT TYPE: Type E Permafrost ADDITIVES' Retarder WEIGHT: 12.0 ppg YIELD: 2.17 cu ft/sk. MIX WATER: 11.63 gal/sk APPROX NO SACKS' 250 CENTRALIZER PLACEMENT: 1. 1 Bowspring centralizer per joint of 9-5/8" casing on the bottom 10 joints above the FS. 2. Place all centralizers in middle of joints using stop collars. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix slurry on the fly -- batch mixing is not necessary. CEMENT VOLUME: 1. The Tail Slurry volume is calculated to cover 623' md above the 9-5/8" Casing Shoe with 30% excess. 2. The Lead Slurry volume is calculated to cover from the top of the Tail Slurry to 1500' md with 30% excess and from 1500' md to surface with 100% excess. 4. 80'md 9-5/8", 40# capacity for float joints. 5. Top Job Cement Volume is 250 sacks. RECEIVED APR 2 4 1995 A!aaka Oil & Gas Cons. Commission Anchors~ .,~ MPF-45 7" PRODUCTION CASING CEMENT PROGRAM- HALLIBURTON THIS WILL BE A SINGLE STAGE CEMENT JOB ACROSS THE KUPARUK INTERVAL ONLY: CIRC. TEMP: 140° F BHST 170 deg F at 7260' TVDSS. SPACER: 20 bbls fresh water. 70 bbls Alpha Spacer mixed as per Halliburton specifications weighted to 1.0 ppg above current mud weight. CEMENT TYPE: Premium G ADDITIVES: 0.2% CFR-3, 0.1% HR-5, 0.4% Halad 344 WEIGHT: 15.8ppg YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk APPROX # SACKS: 220 THICKENING TIME: 3 1/2 - 4 1/2 hrs @ 140° F FLUID LOSS: < 50cc/30 rain @ 140° F FREE WATER: 0cc @ 45 degree angle. CENTRALIZER PLACEMENT: 1. 7-1/8 .... x 8-1/4" Straight Blade Turbulators -- two per joint on the bottom 17 joints of 7" Casing (34 total). This will cover 300' above the top of the Kuparuk sands. 2. Run one 7-1/8" x 8-1/4" Straight Blade Turbulator inside the 9-5/8"casing shoe. 3. Total 7-1/8"" x 8-1/4" Straight Blade Turbulators needed is 35. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 8-10 bpm. Batch mixing is not necessary. CEMENT VOLUME: 1. The cement volume is calculated to cover 1000' md above the top of the Kuparuk Sands with 30% excess over a guage hole. RECEIVED APR 2 4 199,5 t~laska 0il & Gas Cons. Commission Anchor~.0 ~, RECEIVED APR 2. 4 1995 DRILLING HAZARDS AND RISKS: See the Milne Point F-Pad Data Sheet prepared by Pete Van Dusen for a general recap of the original No Point well (F-46) recently drilled by BPX. There are also several BHLs drilled from L-pad that can give information relavent F-pad drilling. There will be no close approaches while drilling this well. The gravel on F-pad has only recently been laid. Although frozen the gravel has a relatively high moisture content and has not been compacted. Recently the MPU asset has decided to move N27E from MPF-pad to MPL-pad before break-up. Ensure the rig crews are aware of the unstable nature of the pad before and during break-up conditions. The MPU Construction group will probably be installing VSMs on this pad as MPF-45 is drilled. Ensure the rig crews and contractors associated with rig operations use caution and are aware of the progress and status of operations with regard to VSM installations while working on this pad. The MPU PE group will be perforating, hydraulic fracturing and cleaning out wells with coiled tubing shortly after the rig drills and completes them. This will make the near rig area congested and as a result hazardous. Ensure personnel use caution moving around adjacent production activities. Check with the PE supervisor prior to injecting fluids down an annulus on any wells that the PE group may be working on. Lost Circulation: No Point #1 (MPF-46) did not experience any lost circulation while drilling the only well drilled to date on F-pad. The max mud weight reached on that well was 10.3 ppg. They did experience some mud losses while cementing 7" casing. Lost circulation while drilling the production interval has been a problem on 4 different L-pad wells, the closest pad to F-pad, although none of them have BHLs in the F-pad drilli~_g area. The Kuparuk sands and a number of shallower intervals typically are highly fractured. Wells L-07, L-08, L-09 and L-11 lost varying amounts of mud (from 70 to 220 bbls) drilling through or near the top of the Kuparuk sands. Be prepared to treat these losses initially with LCM treatments. Stuck Pipe Potential: While drilling No Point #1 (MPF-46) the 6" BHA was stuck in 8-1/2" hole section for several hours at 6882' ss (13608' MD) before jarring free. They became stuck after tripping back to bottom following a bit trip. Lack of proper hole cleaning parameters appears to have contributed to this problem. Stuck pipe has occurred on 3 L-pad wells at the interface between the Kalubik and D-shale (called the Kuparuk cap rock). These wells and the corresponding depths at which they were stuck were: L-06 @ 6871' ss, L-07 @ 6859' ss, L-11 @ 6835' ss. There have been no stuck pipe incidents while drilling the initial four (4) wells with Nabors 27E on MPF-pad. Kick Tolerance: The surface casing setting depth for this well allows a kick tolerance of 95 bbl influx (Gas) based on a 12.5 ppg LOT at the 9-5/8" casing shoe and a estimated reservoir pressure of 3536 psig (9.6 ppg equivalent MW). Trip Schedules are required for all trips. All trips will be performed with a trip tank or one pit isolated for use as a trip tank. Formation Pressure: The maximum expected pore pressure for this well is 9.6 ppg EMW (3536 psi @ 7085' TVD). There has been no injection in this particular fault block. BPX-Shared Services Drilling Alaska State Plane: Zone4 l~lne Pt. · MPF "'i iv-45 ~' ~-45 Wp2 :50g OD~-- 5500 -- iOOU~ &50l-- KDP / S']ARI' IO0g t~,Od'/tO0 EtlP U: ~OliO I7~H S[ART tip CU~ ~ END fl: CU~V~ 433? T. ~'qd~ 3533 B~FF ~q~ Gyro 770G 7TUG ~TA~r Ur I lUS~ CU~E F~ t t 3169 H~F~A I [nC O.dd'346,00' 0.00°346.00' 3.00' ~46.00' 12.0O' 346 00' 12.06' 346,UU° I~.O0' 346.00' 346.09* 346.09' 346.0!)' 7~.00' 346.09' 7~.00' 7~.00' 346,09' 40.00' 3~.00' 40.00' 346.00' 40.gu° 3~6.00' 1~u0 O N 1300 8 H ~ 17~5 7G ~ 19¢9 tO/ N ~l 43L5 3580 N 4606 4~87 ~ IIL~ 4606 4600 ~972 8530 X 2114 605~ 9OOt N ~429 7fl0599~g N CA$ING P~II~ )AT& 9 318 lA GIg& 7~.00' 3¢&.09' 7 In 1418& 4O,O§' 346.00' t~ 0 M 0 ~ 4377 37G4 H 9~3 ¥ TGrUc k K~F 366g 2.0o' I 6~O& Wg I. $chra~t~r Bluff PI~OPOS£D BIlL it/T)74o4.81 ~l) 14168.00 V3 10656.53 N~S 10248.2? N G',ld X G~ld ~ I 1708 tO09/ tiAI .L I BURTON 4/1(3/93 I IO~ pa }{OHIZONTA[, VIE.W (TRUg NOl{'i'll) bOO fL./ [J[VL~ION SlJltVi~¥ ItEl,'; WEI/.IIEAD iLO00 o~qG .U~u. --i 0500 3&n.u -40000 ..- 9000 .--7000 --3500 --3000 --~000 -1500 --IOn0 .--500 -T) ;0 UI 'r) WELL PERMIT CHECKLIST oo,. UNIT# PROGRAM: exp [] dev~ redrll [] serv [] ON/OFF SHORE (-~j ADMINISTRATION 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Permit fee attached .................. N Lease number appropriate ............... N Unique well name and number .............. N Well located in a defined pool ............. N Well located proper distance from drlg unit boundary. . N Well located proper distance from other wells ..... N Sufficient acreage available in drilling unit ..... N If deviated, is wellbore plat included ........ N Operator only affected party .............. N Operator has appropriate bond in force ......... N Permit can be issued without conservation order .... N Permit can be issued without administrative approval. . N Can permit be approved before 15-day wait ....... N ENGINEERING APPR 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 28. 29. Conductor string provided ............... (2Y~ N Surface casing protects all known USDWs ........ .~ N CMT vol adequate to circulate on conductor & surf csg. N CMT vol adequate to tie-in long string to surf csg . . . Y CMT will cover all known productive horizons ...... ~ N Casing designs adequate for C, T, B & permafrost .... ~ N Adequate tankage or reserve pit ............. N If a re-drill, has a 10-403 for abndnmnt been approved. Adequate wellbore separation proposed...................~y~ N If diverter required, is it adequate. N Drilling fluid program schematic & equip list adequate .~ N BOPEs adequate ..................... ["~ N BOPE press rating adequate; test to ff~ psig.~J/ N Choke manifold complies w/API RP-53 (May 84) ...... ~ Work will occur without operation shutdown ....... Is presence of H2S gas probable ............ GEOLOGY / 30. Permit can be issued w/o hydrogen sulfide measures .... Y 31. Data presented on potential overpressure zones ..... Y /N 32. Seismic analysis 9f shallow gas zones .......... ~/ N 33. Seabed condition survey (if off-shore) ........ /Y N // . Y N 34. Contact name/phone for weekly progress reports . . . ~, · GEOLOGY: [exploratory only] ENGINEERING: O'DH ,~ RAD-~--~:~ C~mms~ts/Instruotious: - A:~--ORMS%cheklist rev 03/94 I-.--t Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organiZe this category of information. Tape Subfile 2 is type: ~S TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 AK-MM- 950731 M. HA_NIK J. GAFFANEY MPF-45 500292255600 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 25-OCT-96 MWD RUN 2 M. HANIK J. GAFFANEY MWD RUN 3 M. HANIK J. GAFFANEY MWD RUN 4 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD J. S TRAHAN J. GAFFANEY 6 13N 10E 2608 Date 0.I 48.35 46.85 13.40 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 9.625 6678.0 8.500 14220.0 MWD - GR/EWR4/CNP/SLD. ALL DEPTHS ARE MEASURED BIT DEPTHS. WELL MPF-45 IS REPRESENTED BY RUNS 1-4. RUN 1 IS DIRECTIONAL WITH GAMMA RAY (SGRC) AND ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4) . RUNS 2-4 ARE DIRECTIONAL WITH GAMMA RAY (SGRC), ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4), COMPENSATED NEUTRON POROSITY (CNP/SPSF), AND STABILIZED LITHO-DENSITY (SLD/SBDC). GAMMA RAY DATA ACQUIRED WITH DUAL GAMMA RAY, GEIGER MUELLER TYPE DETECTORS, AND IS DENOTED AS DGR/SGRC. GAPS IN GAMMA RAY DATA FROM 7790' TO 13328' DUE TO INTERMITTENT TOOL FAILURE. DATA GAPS IN BULK DENSITY, FAR Pe, AND STANDOFF DUE TO INTERMITTENT TOOL RESET. INTERVAL FROM 13780' TO 13831' WAS WIPED AFTER FISHING OPERATIOz~ FOR CONES LOST FROM BIT. ROP DATA PRESENTED FROM 13780' TO 13831' IS WIPING SPEED. ANNU~ AND CRITICAL VELOCITIES CALCULATED USING THE POWER LAW MODEL. WELL MPF-45 DATA HAS BEEN DEPTH SHIFTED. WELL MPF-45 WAS DRILLED TO TD AT 14220'. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RP NPHI RHOB $ BASELINE CURVE FOR SHIFTS: GRCH CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH 373.0 366.0 6676.0 6676.0 BASELINE DEPTH GR 12023.5 12027.5 12054 . 0 12061.0 12081.0 12080 . 5 12162 . 0 12168 . 5 12210.0 12210.5 12266.5 12271.5 12337 . 5 12332 . 5 12421.5 12428.5 12765.5 12763.5 12837.0 12834 . 0 13180.0 13182.0 13344.5 13348.5 13366.5 13371.0 13427.0 13426.0 13442.5 13435.0 13491.0 13496.0 13496 . 0 13500 . 0 13521.0 13525 . 0 13550 . 0 13554 . 5 13572.0 13575.0 13626.0 13629.5 13639.5 13642.5 13692 . 0 13691 . 0 13697 . 0 13695 . 5 13698.0 13696.5 13767.0 13767.5 13768.5 13768.5 13830 . 0 13833 . 0 13843.0 13846.0 13846 . 5 13849 . 0 13878 . 5 13877 . 0 13891 . 0 13892 . 0 13973 . 5 13975 . 0 14044 . 5 14041 . 0 14055.0 14052 . 0 $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MWD 1 MWD 2 all bit runs merged. STOP DEPTH 14176.0 14149.0 14156.0 14165.0 (WALS, Cased Hole, 19-Aug-95.) EQUIVALENT UNSHIFTED DEPTH MERGE TOP MERGE BASE 421.0 6705.0 6705.0 13328.0 MWD MWD REMARKS: 3 13328.0 13780.~ 4 13780 . 0 14220 . 0 MERGED M~IN PASS. CN WN FN COUN STAT / ? ?SHIFT. OUT $ : BP EXPLORATION (ALASKA) : MPF-45 : MILNE POINT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 RHOB MWD 68 1 G/C3 4 7 DRHO MWD 68 1 G/C3 4 8 PEF MWD 68 1 BN/E 4 9 NPHI MWD 68 1 PU-S 4 10 FET MWD 68 1 HR 4 11 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 350 01 1 4 90 356 99 1 4 90 358 01 1 4 90 890 01 1 4 90 180 01 1 4 90 810 01 1 44 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 1325 Tape File Start Depth = 14250.000000 Tape File End Depth = 340.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 333853 datums Tape Subfile: 2 1466 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 374.0 EWR4 366.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR .REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 6657.0 6650.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : 12 -JUL- 95 ISC 2.02 3.93 MEMORY 6705.0 421.0 6705.0 0 .2 72.3 TOOL NUMBER P0362CRG8 P0362CRG8 12.250 .0 SPUD 9.30 44.0 8.3 1200 7.6 2 .900 1.980 2.900 4.100 70.0 106.0 70.0 70.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 1. $ :BP EXPLORATION (ALASKA) : MPF-45 : MILNE POINT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 411 Tape File Start Depth = 6710.000000 Tape File End Depth = 340.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 101929 datums Tape Subfile: 3 476 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 6627.0 EWR4 6599.0 CNP 6678.0 SLD 6679.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13262.0 13243.0 13250.0 13259.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SLD LITHO-DENSITY DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: 20-JUL-95 ISC 2.02 3.93 MEMORY 13328.0 6705.0 13328.0 0 41.1 73.6 TOOL NUMBER P0363CRNSLDG6 P0363CRNSLDG6 P0363CRNSLDG6 P0363CRNSLDG6 8.500 6678.0 LSND-HT 10.20 44.0 9.5 500 5.4 3.000 1.490 3 .250 2.500 68.0 144. 0 70.0 70.0 SANDSTONE 2.65 HOLE CORRECTION (1~,~ : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: MWD RUN 2. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : MPF-45 : MILNE POINT : NORTH SLOPE : ALASKA .0 0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68- 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 RHOB MWD 68 1 G/C3 4 7 DRHO MWD 68 1 G/C3 4 8 PEF MWD 68 1 BN/E 4 9 NPHI MWD 68 1 PU-S 4 10 FET MWD 68 1 HR 4 11 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 350 01 1 4 90 356 99 1 4 90 358 01 1 4 90 890 01 1 4 90 180 01 1 4 90 810 01 1 44 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 643 Tape File Start Depth = 13335.000000 Tape File End Depth = 6590.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 495746 datums Tape Subfile: 4 712 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 13229.0 EWR4 13195.0 CNP 13211.0 SLD 13219.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13717.0 13690.0 13698.0 13707.0 22-JUL-95 ISC 2.02 3.93 MEMORY 13780.0 13328.0 13780.0 0 35.9 37.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SLD LITHO-DENSITY DGR DUAL GAMMA RAY $ TOOL NUMBER P0389CRNSLDG6 P0389CRNSLDG6 P0389CRNSLDG6 P0389CRNSLDG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 8.500 6678.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: LSND-HT 10.20 44.0 9.5 5OO 5.4 3.100 1.510 3.300 2.700 SANDSTONE 2.65 70.0 151.0 70.0 70.O HOLE CORRECTION TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: MWD RUN 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : MPF-45 : MILNE POINT : NORTH SLOPE : ALASKA .0 0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 RHOB MWD 68 1 G/C3 4 7 DRHO MWD 68 1 G/C3 4 8 PEF MWD 68 1 BN/E 4 9 NPHI MWD 68 1 PU-S 4 10 FET MWD 68 1 HR 4 11 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 350 01 1 4 90 356 99 1 4 90 358 01 1 4 90 890 01 1 4 90 180 01 1 4 90 810 01 1 44 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 58 Tape File Start Depth = 13790.000000 Tape File End Depth = 13190.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 116342 datums Tape Subfile: 5 127 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 13697.0 14174.0 EWR4 13668.0 14147.0 CNP 13677.0 14154.0 SLD 13686.0 14163.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 26-JUL-95 ISC 2.02 3.93 MEMORY 14220.0 13780.0 14220.0 0 35.2 38.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SLD LITHO-DENSITY DGR DUAL GAMMA RAY $ TOOL NUMBER P0389CRNSLDG6 P0389CRNSLDG6 P0389CRNSLDG6 P0389CRNSLDG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: 8.500 6678.0 LSND-HT 10.40 44.0 9.5 500 5.4 3.100 1.500 3.300 2.700 SANDSTONE 2.65 70.0 152.0 70.0 70.0 HOLE CORRECTION (In/ : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: MWD RUN 4. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : MPF-45 : MILNE POINT : NORTH SLOPE : ALASKA .0 0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM ~ 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 RHOB MWD 68 1 G/C3 4 7 DRHO MWD 68 1 G/C3 4 8 PEF MWD 68 1 BN/E 4 9 NPHI MWD 68 1 PU-S 4 10 FET MWD 68 1 HR 4 11 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 350 01 1 4 90 356 99 1 4 90 358 01 1 4 90 890 01 1 4 90 180 01 1 4 90 810 01 1 44 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 57 Tape File Start Depth = 14250.000000 Tape File End Depth = 13660.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 509919 datums Tape Subfile: 6 126 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 7 is type: LIS 96/10/24 01 **** REEL TRAILER **** 96/10/25 01 Tape Subfile: 7 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 25 OCT 96 12:46p Elapsed execution time = 8.30 seconds. SYSTEM RETURN CODE = 0 MPF - 45 cF ~~~ f:~ M[~I~0 ~[[~~LNE POINT RECEIVED Run 1' 19 - August - 1995 Marked Line GR Cased Hole 11988 4083 ilII~:STERN ATLAS Logging Services Tape Subfile 2 is type~ LIS TAPE HEADER MILNE POINT UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MPF - 45 500292255600 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 30-AUG-95 6472.00 K. RICHARDS J. FOX 6 13N 10E 1979 2608 48.35 46.35 13.40 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 3RD STRING 9.625 6678.0 PRODUCTION STRING 7.000 14191.0 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS GR GRCH 1 1 19-AUG-95 WESTERN ATLAS LOGGING SERVICES PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH $ Marked Line GR/CCL. EQUIVALENT UNSHIFTED DEPTH REMARKS: 40.00 26.00 *** THIS IS THE DEPTH REFERENCE FOR THIS WELL *** PASS 1 (MAIN PASS) WAS NOT DEPTH SHIFTED SINCE THE MAIN PASS IS THE DEPTH REFERENCE FOR THIS WELL. LOG WAS RUN WITH MARKED LINE FOR PRIMARY DEPTH CONTROL. FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 11988.0 14083.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 BASELINE DEPTH $ REMARKS: EQUIVALENT UNSHIFTED DEPTH PASS 1 (MAIN PASS). THE GAMMA RAY FROM THIS PASS IS THE DEPTH REFERENCE FOR THIS WELL. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : MPF - 45 : MILNE POINT/KUPARUK : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 1 Curves: Name Tool Code Samples Units GRCH GR 68 1 GAPI API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 30 310 01 1 * DATA RECORD (TYPE# 0) Total Data Records: 34 1022 BYTES * Tape File Start Depth = 14105.000000 Tape File End Depth = 11976.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE ~RAILkR **** LIS representation code decoding summary: Rep Code: 68 8519 datums Tape Subfile: 2 124 records... Minimum record length: 62 bytes Maximum record length: 1022 bytes · Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 13859.0 14083.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 BASELINE DEPTH GRCH 13862.0 13861.5 13871.5 13871.5 13876.0 13876.5 13899.0 13899.0 13907.5 13908.5 13920.0 13920.0 13968.5 13968.5 13979.5 13980.5 13986.0 13986.5 13999.5 13999.5 14018.5 14017.5 14024.0 14023.5 14028.0 14027.5 14034.0 14034.5 14036.0 14036.0 14043.5 14044.0 14055.0 14055.0 14063.0 14062.5 14068.0 14067.5 14073.0 14072.5 14079.0 14078.5 $ REMARKS: EQUIVALENT UNSHIFTED DEPTH PASS 2 (REPEAT PASS). CN WN FN COUN STAT ?MATCH. OUT : BP EXPLORATION (ALASKA) : MPF - 45 : MILNE POINT/KUPARUK : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth Ih: F 1 Curves: Name Tool Code Samples Units 1 GRCH GR 68 1 GAPI 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 30 995 99 1 * DATA RECORD (TYPE# 0) 1022 BYTES * Total Data Records: 5 Tape File Start Depth = 14114.000000 Tape File End Depth = 13849.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1063 datums Tape Subfile: 3 57 records... Minimum record length: 62 bytes Maximum record length: 1022 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11988.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 14101.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ROL SBAR ROL PCM GR $ ROLLER SINKER BAR SINKER BAR ROLLER SINKER BAR PCM/CCL GAMMA RAY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 19-AUG-19 FSYS JIV2.0 UPDATE1 1754 19-AUG-95 14220.0 14084.0 12000.0 14083.0 2400.0 YES TOOL NUMBER 8250EA/8248EA 8220XA .000 14191.0 .0 SEAWATER .00 .0 .0 0 .0 .000 .000 .000 .0 .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZIN~ WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS): 0 NEAR COUNT RATE LOW SCALE (CPS) : 0 NEAR COUNT RATE HIGH SCALE (CPS): 0 TOOL STANDOFF (IN): .0 REMARKS: PASS 1 (MAIN PASS). $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : MPF - 45 : MILNE POINT/KUPARUK : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR GR 68 2 CCL GR 68 3 SPD GR 68 4 TEN GR 68 1 GAPI 4 1 4 1 F/MN 4 1 LB 4 4 30 310 01 1 4 30 150 01 1 4 30 636 99 1 4 30 635 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 171 Tape File Start Depth = 14105.000000 Tape File End Depth = 11976.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 51105 datums Tape Subfile: 4 246 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile ~ is type: LIS FILE HEADER FILE NUMBER: 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 13858.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 14110.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ROL SBAR ROL PCM GR $ ROLLER SINKER BAR SINKER BAR ROLLER SINKER BAR PCM/CCL GAMMA RAY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 19-AUG-19 FSYS JIV2.0 UPDATE1 1742 19-AUG-95 14220.0 14084.0 12000.0 14083.0 2400.0 YES TOOL NUMBER 8250EA/8248EA 8220XA .0O0 14191.0 .0 SEAWATER .00 .0 .0 0 .0 .000 .000 .000 .0 .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZIN~ WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 0 NEAR COUNT RATE LOW SCALE (CPS) : 0 NEAR COUNT RATE HIGH SCALE (CPS) : 0 TOOL STANDOFF (IN): .0 REMARKS: PASS 2 (REPEAT PASS). $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : MPF - 45 : MILNE POINT/KUPARUK : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR GR 68 2 CCL GR 68 3 SPD GR 68 4 TEN GR 68 1 GAPI 4 1 4 1 F/MN 4 1 LB 4 4 30 310 01 1 4 30 150 01 1 4 30 636 99 1 4 30 635 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 22 Tape File Start Depth = 14114.000000 Tape File End Depth = 13849.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 6369 datums Tape Subfile: 5 97 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile ~'is"type: LIS 95/ 8/30 01 **** REEL TRAILER **** 95/ 8/31 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 31 AUG 95 11:37a Elapsed execution time = 1.49 seconds. SYSTEM RETURN CODE = 0