Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout184-008 Ima ect Well History File Cove~ ;le XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity.or are viewable by direct inspection of the file. ~ ¢ ¢- ~ o ~ ~v~., .,.,o~ ~,,~,~.,,,,~ RESCAN DIGITAL DATA OVERSIZED (Scannable) [] Color items: [] Diskettes. No. [] Maps: [] Grayscale items: [] Other, No/Type [] Other items scannable by large scanner [] Other: ,,,"rtl/ Logs of various kinds NOTES: [] Other BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: IS/ Project Proofing BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /S/ Scanning Preparation ~ x 30 = + = TOTAL PAGES Production Scanning Stage f PAGE COUNT.ROM SCANNED F,LE: / ~ Stage 2 {SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY. GRAYSCALE OR COLOR IMAGES) PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: /~YES NO IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YESNO III IIIllllllll il Ill RESCANNEDBY; BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /S/ General Notes or Comments about this file: Quality Checked Memorandum State of Alaska Oil and Gas Conservation Commission To: Well File: K~ (~ --t~)~~ DATE Re: Cancelled or Expired Permit Action EXAMPLE: Point McIntyre P2-36AXX API# 029-22801-95 This memo will remain at the front of the subject well file. Our adopted conventions for assigning APl numbers, permit numbers and well names did not specifically address expired or cancelled permits. This omission has caused some inconsistencies in the treatment of these kinds of applications for permit to ddll. Operators have asked us to adopt formal procedures for this class of permit application in order to prevent future database disparities. If a permit expires or is cancelled by an operator, the permit number of the subject permit will remain unchanged. The APl number and in some instances the well name reflect the number of preexisting reddlls and or multilaterals in a well. In order to prevent confusing a cancelled or expired permit with an active well or multilateral these case sensitive well identifiers will be changed for expired and cancelled applications for permits to ddll. The APl number for this cancelled or expired permit is modified so the eleven and twelfth digits is 95. The well name for a cancelled or expired permit is modified with an appended xx. These procedures are an addendum to the APl numbering methods described in AOGCC staff memorandum "Multi-lateral (weiibore segment) Drilling Permit Procedures, revised December 29, 1995. AOGCC database has been changed to reflect these changes to this permit. Statistical Technician Jan~m~.~ 18, 1984 ~. W. R. Stewart President Sim~_sko' Production Company P. O. Box 101515 Anchorage, Alaska 99510 SIM~CO E. Moquawkie No. 2 Simasko Production Company Permit No. 84-8 Sur. Loc. 750'~, ]500'FEL, Sec. 6, TI!N, RllW, SM. Btmho!e Loc. S A M E. Dear Mr. Stewart Enclosed is the approved application for permit to drill the above referenced well. If coring is Conducted, a one cubic inch chip from each foot of recovered core is required. Samples of well cutttn~ and a mud log are required. An inclination survey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log informagion shall be submitted on all logs for copying except e~erimenta! logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or m~gratiou of anadromous fish. Operations In these areas are subject to AS 16.05.870 ~ud~the regu!atious promulgsted thereunder (Title 5, Alaska Administrative Code). Prior to commencing operatiou~ you may be contacted by the Habitat Coordinmtor's Office, Department of Fish and Game. Pollution of.any waters of ~he ~tate is prohibited by AS 46, ChaPter 3, ~ticle 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal ~ater Pollution Control. Act, a~ amended. Prior to commencing operations you may be contacted by a representative of the Department of Envi~onmeutaI Conserv'atiou. To aid us in scheduling field work, please notify this office hours prior to commencing !n~ta!lation of the blowout prevention Mr. W. R. Stewart ,~ SiMP-CO E, Moquawk.~'' V~o, 2 -2- Januar~v 18, I9~-4 equipment so that a representative of the Commission may be present to witness t~ating of the equipment before the surface casing shoe is drilled, !~here a d!verter system is required, please_ a~so" notify ~h~-~.~ office 24 hours prior, to commencing equipment ~...stal!ation ~o that the CommiSsion may witness testing befor~ drilling b~low the ~hoe of the conductor pipe. In the event of suspension or abandonment, p].e~se give this office adequate advance notification so that we may have a witness pre~ent. Department of Fi~.h & Game, Habitat Section w/o eno!. Department of Env~.,ronment~l Contamination w/~ encl. Simasko Production Company P. O. BOX 101515 · ANCHORAGE, ALASKA 99510 ° (907) 277-5932 ° 274-4591 ° FAX (907) 277-0652 January 6, 1984 Re: SIMPCO East Moquawkie #2 Application for Permit to Drill HAND DELIVERED Alaska Oil and Gas Conservation Commission State of Alaska 3001 Porcupine Drive Anchorage, AK 99501 Attn: Mr. C. V. Chatterton Commiss loner Gentlemen: On October 22, 1983, Permit No. 81-156 for drilling of the captioned exploratory well on the west side of Cook Inlet expired pursuant to 20 AAC 25.005 (k). Simasko Production Company hereby makes application for a new permit to drill the well at a revised location in Section 6, TllN, RllW, S.M. Enclosed in triplicate are the following: (1) Completed and executed Form 10-401, "Permit to Drill" . (2) Supplemental Data Sheet attached to the Permit form providing detailed information on casing program, cementing program, drilling fluids, anticipated geology, formation evaluation, and pressure control practices. (3) Proposed Location Plat prepared by R. C. Davis & Associates. (4) Blowout Preventor Equipment Drawings for 17 1/2" surface hole and for 12 1/4" and 8 1/2" hole. (5) Surface Facilities Map upon which existing facilities are indicated together with lease boundaries. Also enclosed is the required fee in the amount of $100.00, payable to the State of Alaska, Department of Revenue. Alaska Oil and Gas Conservation Commission January 6, 1984 Page Two This wellsite is located on a fee lease which has been entered into by and between Cook Inlet Region, Inc., as Lessor and Simasko Production Company, as Lessee. The wellsite lease contains 13,273 acres and is indicated as "Area I" on the Surface Facilities Map. A Surface Use Agreement has been entered into with Tyonek Native Corporation, owner of the surface estate, covering all surface activities including extraction of gravel and construction drillpads, roads, and airstrips. As indicated on the executed application form, Simasko Production Company maintains a $200,000 Statewide Blanket Bond from Travelers Indemnity Company bearing Bond No. 148F0140. This bond was submitted to your office on January 12, 1981. It is the present intention of Simasko Production Company to drill both the SIMPCO East Moquawkie ~2 and the SIMPCO Chuitna ~1 (the subject of a separate application being submitted contemporaneously with this application) during 1984, but we are uncertain at this date due to ongoing evaluation of seismic and subsurface data as to the order in which the two wells will be drilled. However, we are targeting for a May 1, 1984 spud date on the first well to be drilled and will, therefore, appreciate your early attention to review of this matter. Sincerely,/ W. R. Stewart President WRS: nk Enclosures la. Type of work. ,---, STATE OF ALASKA ALASKAn. .AND GAS CONSERVATION CC MISSION PERMIT TO DRILL 2. Name of operator DRILL Pq REDRILL DEEPEN 20 AAC 25.005 lb. Type of well Simasko Production Company 3. Address P.O. Box 101515, Anchorage, AK 99510 EXPLORATORY [] DEVELOPMENT OIL [-] DEVELOPMENT GAS I-~ SERVICE [] STRATIGRAPHIC [-] SINGLE ZONE [] MULTIPLE ZONE [] 4. Location of well at surface 750' FNL, 1500' FEL, Section 6, TllN, RllW, a.M. At top of proposed producing interval : . Straight hole. At total depth 5. Elevation in feet {indicate KB, DF etc.) ' -+400' GR (est. tope) 12. Bond information (see 20 AAC 25.025'i 6. Lease designation and serial no. None Travelers Indemnity Co. 9. Unit or lease name SIMPCO East Moquawkie 10. Well number 2 11. Field and pool Wi 1 dcat Type Blanket Surety and/or number 148F0140 Amount $200,000 13. Dislance and direction from nearest town 5 miles 16. Proposed depth (MD & TVD) 10,000' MD&TVD 19. If deviated (see 20 AAC 25.050) KICK OFF POINT feet. 21 14. Distance to nearest property or lease line -+1 5 00 feet 17. Number of acres in lease feet 13,273 J 20. Anticipated pressures MAXIMUM'RULE ANGLE "|{see 20 AAC 25.035 (c) ! 15. Distance to nearesl drilling or completed well -+3800 feet 18. Approximate spud date Mav !, 1984 3780 psig@ Surface 4900 psig@ ~ 0__~__0_0_0_0_0_0_~00~. TD {TVD) Proposed Casing, Liner and Cementing Program SIZE Hole I Casing 2(')" 7 ~ ~/~ 9 5,/R" 7" Weight c)4 ~7 40r47 23:26 CASING AND LINER Grade 14-55 N-BO S-95 Coupling Rt7tt T.T&C LT&C .! Length 2500' 7600' 2700' MD TOP TVD .~7 7 ~ 'f'~ Jrt::~ Surf~.e , ! -+7300 ~MD: TVD I I SETTING DEPTH QUANTITY OF CEMENT MD BOTTOM TVD (include stage data) I -+R~' ~D,TVD Driven - No C~m~n~ +_2$O0~_MD¢TVD See attachment +_7600~ MD_TV~ See attachment -+10:0~0 M~:T~D See attachment 22. Describe proposed program: See attached Supplemental Data Sheet. Proposed location plat is attached. As-built survey will be sumbmitted after setting conductor. Attached Surface Facilities Map shows the lease boundaries. BOP Program: Surface to 2500' - 20", 2000 psi, SA diverter system. 2500' to 10,000' (TD) - 13 5/8", 5000 psi, SRRA system with 2", 5000 psi choke mani fold. The space below for Commission use W. R. Stewart CONDITIONS OF APPROVAL. DATE ,7,-~ r~ F; 7 ct.qz/ Samples required /[~Y ES []NO -'P~rmi! number APPROVED BY 84-8 Mud log required FYES [~NO Directional Survey required [~YES J AP_I n~_ mher so -83-20072 SEE COVER LETTER FOR OTHER REQUIREMENTS .COMMISSIONER DATE January 18, 1984 by order of ~he Commission Supplemental Data Sheet Application for Permit to Drill SIMPCO East Moquawkie No. 2 I. Casing Program: Conductor: 20", 94 lb/ft, H-40: Surface Casing: 13 3/8", 61 lb/ft, K-55, ST&C: Intermediate Casing: 9 5/8", 40 lb/ft, N-80, LT&C: 9 5/8", 47 lb/ft, N-80, LT&C: Liner: 7", 23 lb/ft, S-95, LT&C: 7", 26 lb/ft, S-95, LT&C: Driven to +80' Surface to 2500' Surface to 4700' 4700' to 7600' 7300' to 9000' 9000' to 10,000' The casing weights and grades listed above are preferred. At the time of purchase, however, it may be necessary to adjust slightly depending on availalability. If adjustments are necessary, the performance properties of the final design will meet or exceed the designs listed above. The Alaska Oil and Gas Conservation Commission office will be notified appropriately in the event a deviation from the above design is necessary. II. Cementing Program: A. The 13 3/8" surface casing will be cemented to surface with 1000 sacks of Class "G" containing 4% dry blend gel (includes 40% excess) followed by 800 sacks of Class "G" containing 2% calcium chloride (includes 30% excess). Duplex cementing technique will be used. B. The 9 5/8" intermediate casing string will be cemented with 700 sacks of Class "G" cement containing fluid loss additives, turbulence inducer and retarder. This should yield a 2000' cement column plus 30% excess. If potentially productive horizons are encountered above the projected cement top, a second stage cement job will be performed through a DV collar. C. The 7" liner will be cemented with 300 sacks of Class "G" cement containing fluid loss additives, turbulence inducer, and retarder. The liner hanger will be cement squeezed with 100 sacks of Class "G" containing the appropriate additives for cement squeezing. Each cement job will be preceeded with a spacer fluid of the proper weight, viscosity, and inhibitors for formation stabilization. Actual cement volumes will be calculated from open hole electric log caliper data. III. Drilling Fluid Program: Surface to 2500 ' - Benex-gel/fresh water 2500' to 10,000 (TD) - Low solids polymer system IV. Anticipated Geology: Ve Surface to +250' - +250' to +2750' - · 2750' to--10,000'(TD) - Formation Evaluation: Gravel Beluga Formation Tyonek Formation A. Standard mud logging equipment will be installed prior to spudding and will be used throughout drilling. B. One or more full size cores are anticipated to be cut at intervals to be determined by the wellsite geologist. C. Wireline logs run will include dual induction laterolog, compensated sonic log, compensated density- neutron log, and dipmeter. D. Horizons of indicated hydrocarbon potential will be tested by drillstem test procedures carefully minimizing formation damage. VI. Pressure Control Practices Drilling history in the immediate area has indicated that the pore pressure gradient at depth is about 0.49 psi/ft. Applying this to the projected total depth, the maximum anticipated bottom hole pressure is 4900 psi at 10,000' TVD. In the remote possibility that the hole were to become totally gas filled, the maximum surface pressure would reach 3780 psi using a gas gravity of 0.75 (air = 1.0), which has been measured from DST recoveries on other wells in the area. The "constant drill pipe pressure" method (Drillers Method) will be the well control method used on this well. This method results in the controlled expansion of the "kick" as it is circulated out of the wellbore minimizing potential surface pressures. 24 25 -- I' ' . r'- ]'~ I I I it,...-......., I I Ig ~ I ~o I ~l , ! ( I I I , i · I -t---- -- -- ' I I I $o I I .... I PROPOSED I EAST MOQUAWKIE No.~ I LAT : 61°04'41.30'' LON~. = I~1° 18'02.60" 33 I iY= 2,595,867.57; jI T 12 N i' $ I I RESERVATIONI I I ,36 INDIAN SCALE~ I": I MILE CERTIFICATE OF SURVEYOR , I hereby ce'rtify thor I om properly registered end licensed to proctice Iond surveying in the Store of Alosko end . thotthis plot representse Iocotion survey mede by me or under my supervision, ond thet oll dimensions ond other-' detoils ore correct. , ~ ~. ~, Dote SURVEYOR PROPOSED EAST MOOUAWKIE No.2 Located in NE I/4 SEC 6 TIIN~ RIIW~ $,M,~AK, Surveyed fcr SIMASKO PRODUCTION CO. Surveyed by R.C. DAVIS 8~ ASSOC. LAND 8~ MINERAL SURVEYORS 629 L. ST. -~2A - SRA BOX 5495-C ANCHORAGE, AK. 17 " SURFACE HOLE BOPE DIVERTER ARRANGEMENT Active Fluid Level . ?i ll-up__.~. Line Kill Line__~ Cellar 2 Flow Line 20" Hydril MSP divert'er 2000 s i 20" drilli spool PROFILE VIEW All turns to be long-radius Minimum of 4' of freeboard above active fluid level. 6" (min.) line pipe air or steam for purging To diverter manifold Inverted "U" Tube Diverter System If a kick is experienced, closing the Hydril diverter will immediately allow the wellbore fluid to flow through the inverted "U" tube to the diverter mani- fold which always has one valve open. Operation of the quick o~'ening butterfly valves in the diverter manifold, to control the direction of flow, is accomp- lished manually. To end of reselve pit Mech. Tee ~u~ck-open [butterfly valves To end of reserve pit DIVERTER MANIFOLD 1. System is always open to flow (no closed valve) and is therefore fail-safe. 2. System does not require automating valves with the BOP controls. 3. System is simple and trouble free. 4. Outlet from the drilling spool is sloped toward the spool for self- cleaning. 5. Entire system downstream of "U" tube is sloped toward reserve pit for drainage. 6. System can be purged with air or steam. SIMPCO EAST MOQUAWKIE 17 1/2' SURFACE HOLE BOPE DIVERTER ARRANGEMENT pl AN VT~W DRILLING NIPPLE ANNULAR PREVENTER la'/, '; 5000 IFILL LI~ 1. ! ! ! J I I (BLIND) Est. 18' to , Rotary I I 36" Beams [~ (PIPE) ~ 1 Is"/, ': 5ooop,i [ 1 [ ,~%','5ooo! +_2" . 20 , 2000 I , ,. IWeld CASIN(~ T ti al~?vo~erCeilor -I K 5000psi SRRA BOP ARRANGEMENT ii (WHILE I~ILLING 12~/4 ~ HOLE) 5 ii 13 Ye, 5000 psi SRRA BOP ARRANGEMENT. (WHILE DRILLING B>2" HOLE) DRILLING NIPPLE IFILL LINE ...rI 1 ANNULAR PREVETER 1-25/,' -~ ,e, 5000 psi 54~/a,, I 13~, 5000 I (BLIND) a6" .. ! ! (PIPE) la%'; 5000 psi i I Est. 18' to j , N,:5ooo J Belms DRILLING SPOOL t24" Top of | + 4" TUBING SPOOL -x..~.~~ !29" CASING SPOOL / -- 2o': 2000 t' [Weld ASING + I above cellar floor~I CHOKE 5000 PSI MANIFOLD WORKING SCHEMATIC PRESSURE Kill Line Valves [. i tBOP DRILLING SPOOL Wellhead %"Nominal ///~'/q -/,zJ, ,~, 3' 7'~F~//'/~ r t-il-gq (2) 3" x 2" psi crosses~ Hand _ T _ -4- Hand .......... Chok Choke ~ ,2"' V '2",,+~ e I. AIl valves to be full- opening. --~ :3 ~ ~ To To ~o 2. All valves to be 5OOOpsi rated. Degasser Reserve Degasser And Pit Or Reserve 3. All manifold components to be Mud Tanks Pit ring-joint flanged. Remote Operated Hydraulic Choke _ O eg asset And Mud Tanks ,L Simasko Production Company ANCHORAGE DENVER SIMPCO EAST MOQUAWKIE '~2 BOPE FOR 12 1/4' & 8 1/2' HOLE SCALE DR. AMS DATE dAN. 1~84 CK'D BA Est. 18' fo Rotary Beams  DRILLING NIPPLE Il ANNULAR PREVENTER 1:3't, '; 5000 5ooo DOUBLE GATE RAMS (BLIND) ! ! FILL UNE (PIPE) 1:3% '; 5000psi I J q t O_+cti~ll ~/. 35/' ': 5000 I J 20" , 2000 I CASING ~' . ,,~ JWeld ' CASING ~' ti al~?V~rCellar-I K 13'~8", 5000psi SRRA BOP ARRANGEMENT,, (WHILE DRILLING 121/4 ~ HOLE) Est. 18' to Rotary 5 ii 13 78, 5000 psi SRRA BOP ARRANGEMENT (WHILE DRILLING 8~:~"HOLE) NIPPLE ..1 ,1 ANNULAR PREVETER 13~/.'', SO00 psi 54 ~/s" I ,:3%'; 5ooo i I DOUBLERAMS GATE (BLIND) ! I (PIPE) 13%': 5000 psi I J J 13%';5ooo j Deltas Top of J Cellar ~ ~ DRILLING SPOOL IO'~ 5000 t_ 29" I0'~ 5000 TUBING SPOOL J 1:3%';5ooo 95/$" CASING SPOOL 20'¢ 2000 above ~elia-7 floor. 20" CASING t 24" CHOKE 5000 PSI MANIFOLD SCHEMATIC WORKING PRESSURE I. All valves to be full-opening. 2. All valves to be 5000psi rated. All manifold components to be ring-joint flanged. tBOP DRILLING SPOOL We I I head ~ " Nominal (2) 3" X 2" 5000 psi crosses,~ Pressure Gouge ~ 2'-~ Hand ~~] ~ ~_~ [~ Hond Adjust Adjust-,x Choke / ~ 2"' V Choke To To To Degosser Reserve Degosser And Pit Or Mud Tanks Reserve Pit Remote Operated Hyd roulic Choke Degosser And M~d Tanks ,= Simasko Produclion Company ANCHORAGE DENVER SIMPCO EAST MOQUAWKIE '~2 BOPE FOR 12 1/4' & 8 1/2' HOLE SCALE DII. AMS DATE dAN.la84 CK'D. BA ROVE DATE __ (2) "Lo~ 46'----, 1"/0"~' ~(2 thru 8) /- / /- · (3) Admin (~ ~-,,---/- / 0 -~'~ ('9 thru i~ '(10 and 11) (4) Casg ~ (12 thru 20) .. i~ELL PERMITS_ .... -... ,,. : ~,:,,'.: . YES NO 1. Is th~ e attached ....................................... 2. Is well to be located in a defined pool ............................ 3. Is well located proper distance from property line .................. ~'~.~:~' 4. Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool ....... - .... 6. Is well to be deviated and is well bore plat 'included .............. '~-- --'--- 7. Is operator the only affected party ................................ 8. Can permit be approved before ten-day wait .......................... · Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed., ................................. ® 10. 11. Is conductor string provided ... ..................................... .~ Is enough cement used to circulate on conductor and surface.. ...... ... Will cement tie in surface and intermediate or production strings ... Will cemen~ cover all known productive horizons .... ' Will surface casing protect, fresh water zones .... i2~ i~ Will ali casing give adequate safety in collapse, t~s bu:st.. ':' Is this well to be kicked off from an existing we.llbore ............. ~. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate well bore separation proposed ........................... 12. 13. 14. 15. 16. 17. 18. 19. 20. (21 thru 24) 21. 22. 23. 24. Is a diverter system required .................................... .. ~ Are necessary diagrams of diverter and BOp'equipment attached .~, Does BOPE have sufficient pressure rating - Test to ~z~zrZ) psig . Does the choke manifold comply w/API RP-53 (Feb.78) ........... , ...... (6) Add: ~ /-//'z~"/ 25. Additional reqUirements ............................................. (D Geology: Engineering :cs JAI_~____~~ -- rev: 12/08/83 INITIAL GEO. UNIT ON/OFF poOL CLASS STATUS AREA NO. SHORE Gao.-;' "z,o --- o