Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout184-008 Ima ect Well History File Cove~ ;le
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity.or
are viewable by direct inspection of the file.
~ ¢ ¢- ~ o ~ ~v~., .,.,o~ ~,,~,~.,,,,~
RESCAN DIGITAL DATA OVERSIZED (Scannable)
[] Color items: [] Diskettes. No. [] Maps:
[] Grayscale items: [] Other, No/Type [] Other items scannable by
large scanner
[] Other:
,,,"rtl/ Logs of various kinds
NOTES:
[] Other
BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: IS/
Project Proofing
BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /S/
Scanning Preparation ~ x 30 = + = TOTAL PAGES
Production Scanning
Stage f PAGE COUNT.ROM SCANNED F,LE: / ~
Stage 2
{SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS
DUE TO QUALITY. GRAYSCALE OR COLOR IMAGES)
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: /~YES NO
IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YESNO
III IIIllllllll il Ill
RESCANNEDBY; BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /S/
General Notes or Comments about this file:
Quality Checked
Memorandum
State of Alaska
Oil and Gas Conservation Commission
To: Well File: K~ (~ --t~)~~ DATE
Re:
Cancelled or Expired Permit Action
EXAMPLE: Point McIntyre P2-36AXX API# 029-22801-95
This memo will remain at the front of the subject well file.
Our adopted conventions for assigning APl numbers, permit numbers and well names did not
specifically address expired or cancelled permits. This omission has caused some inconsistencies in
the treatment of these kinds of applications for permit to ddll. Operators have asked us to adopt
formal procedures for this class of permit application in order to prevent future database disparities.
If a permit expires or is cancelled by an operator, the permit number of the subject permit will remain
unchanged. The APl number and in some instances the well name reflect the number of preexisting
reddlls and or multilaterals in a well. In order to prevent confusing a cancelled or expired permit with
an active well or multilateral these case sensitive well identifiers will be changed for expired and
cancelled applications for permits to ddll.
The APl number for this cancelled or expired permit is modified so the eleven and twelfth digits is 95.
The well name for a cancelled or expired permit is modified with an appended xx.
These procedures are an addendum to the APl numbering methods described in AOGCC staff
memorandum "Multi-lateral (weiibore segment) Drilling Permit Procedures, revised December 29,
1995.
AOGCC database has been changed to reflect these changes to this permit.
Statistical Technician
Jan~m~.~ 18, 1984
~. W. R. Stewart
President
Sim~_sko' Production Company
P. O. Box 101515
Anchorage, Alaska 99510
SIM~CO E. Moquawkie No. 2
Simasko Production Company
Permit No. 84-8
Sur. Loc. 750'~, ]500'FEL, Sec. 6, TI!N, RllW, SM.
Btmho!e Loc. S A M E.
Dear Mr. Stewart
Enclosed is the approved application for permit to drill the
above referenced well.
If coring is Conducted, a one cubic inch chip from each foot of
recovered core is required. Samples of well cutttn~ and a mud
log are required. An inclination survey is required as per
20 AAC 25.050(b)(5). If available, a tape containing the
digitized log informagion shall be submitted on all logs for
copying except e~erimenta! logs, velocity surveys and dipmeter
surveys.
Many rivers in Alaska and their drainage systems have been
classified as important for the spawning or m~gratiou of
anadromous fish. Operations In these areas are subject to
AS 16.05.870 ~ud~the regu!atious promulgsted thereunder (Title 5,
Alaska Administrative Code). Prior to commencing operatiou~ you
may be contacted by the Habitat Coordinmtor's Office, Department
of Fish and Game.
Pollution of.any waters of ~he ~tate is prohibited by AS 46,
ChaPter 3, ~ticle 7 and the regulations promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter 70) and by the
Federal ~ater Pollution Control. Act, a~ amended. Prior to
commencing operations you may be contacted by a representative of
the Department of Envi~onmeutaI Conserv'atiou.
To aid us in scheduling field work, please notify this office
hours prior to commencing !n~ta!lation of the blowout prevention
Mr. W. R. Stewart ,~
SiMP-CO E, Moquawk.~'' V~o, 2
-2- Januar~v 18, I9~-4
equipment so that a representative of the Commission may be
present to witness t~ating of the equipment before the surface
casing shoe is drilled, !~here a d!verter system is required,
please_ a~so" notify ~h~-~.~ office 24 hours prior, to commencing
equipment ~...stal!ation ~o that the CommiSsion may witness testing
befor~ drilling b~low the ~hoe of the conductor pipe.
In the event of suspension or abandonment, p].e~se give this
office adequate advance notification so that we may have a
witness pre~ent.
Department of Fi~.h & Game, Habitat Section w/o eno!.
Department of Env~.,ronment~l Contamination w/~ encl.
Simasko Production Company
P. O. BOX 101515 · ANCHORAGE, ALASKA 99510 ° (907) 277-5932 ° 274-4591 ° FAX (907) 277-0652
January 6, 1984
Re: SIMPCO East Moquawkie #2
Application for Permit to Drill
HAND DELIVERED
Alaska Oil and Gas Conservation Commission
State of Alaska
3001 Porcupine Drive
Anchorage, AK 99501
Attn: Mr. C. V. Chatterton
Commiss loner
Gentlemen:
On October 22, 1983, Permit No. 81-156 for drilling of the
captioned exploratory well on the west side of Cook Inlet
expired pursuant to 20 AAC 25.005 (k).
Simasko Production Company hereby makes application for a new
permit to drill the well at a revised location in Section 6,
TllN, RllW, S.M. Enclosed in triplicate are the following:
(1) Completed and executed Form 10-401, "Permit to
Drill" .
(2) Supplemental Data Sheet attached to the Permit
form providing detailed information on casing
program, cementing program, drilling fluids,
anticipated geology, formation evaluation, and
pressure control practices.
(3) Proposed Location Plat prepared by R. C. Davis
& Associates.
(4) Blowout Preventor Equipment Drawings for
17 1/2" surface hole and for 12 1/4" and
8 1/2" hole.
(5) Surface Facilities Map upon which existing
facilities are indicated together with lease
boundaries.
Also enclosed is the required fee in the amount of $100.00,
payable to the State of Alaska, Department of Revenue.
Alaska Oil and Gas Conservation Commission
January 6, 1984
Page Two
This wellsite is located on a fee lease which has been entered
into by and between Cook Inlet Region, Inc., as Lessor and
Simasko Production Company, as Lessee. The wellsite lease
contains 13,273 acres and is indicated as "Area I" on the
Surface Facilities Map. A Surface Use Agreement has been
entered into with Tyonek Native Corporation, owner of the
surface estate, covering all surface activities including
extraction of gravel and construction drillpads, roads, and
airstrips.
As indicated on the executed application form, Simasko
Production Company maintains a $200,000 Statewide Blanket Bond
from Travelers Indemnity Company bearing Bond No. 148F0140.
This bond was submitted to your office on January 12, 1981.
It is the present intention of Simasko Production Company to
drill both the SIMPCO East Moquawkie ~2 and the SIMPCO Chuitna
~1 (the subject of a separate application being submitted
contemporaneously with this application) during 1984, but we
are uncertain at this date due to ongoing evaluation of seismic
and subsurface data as to the order in which the two wells
will be drilled. However, we are targeting for a May 1, 1984
spud date on the first well to be drilled and will, therefore,
appreciate your early attention to review of this matter.
Sincerely,/
W. R. Stewart
President
WRS: nk
Enclosures
la. Type of work.
,---, STATE OF ALASKA
ALASKAn. .AND GAS CONSERVATION CC MISSION
PERMIT TO DRILL
2. Name of operator
DRILL Pq
REDRILL
DEEPEN
20 AAC 25.005
lb. Type of well
Simasko Production Company
3. Address
P.O. Box 101515, Anchorage, AK 99510
EXPLORATORY []
DEVELOPMENT OIL [-]
DEVELOPMENT GAS I-~
SERVICE [] STRATIGRAPHIC [-]
SINGLE ZONE []
MULTIPLE ZONE []
4. Location of well at surface
750' FNL, 1500' FEL, Section 6, TllN, RllW, a.M.
At top of proposed producing interval :
.
Straight hole.
At total depth
5. Elevation in feet {indicate KB, DF etc.) '
-+400' GR (est. tope)
12. Bond information (see 20 AAC 25.025'i
6. Lease designation and serial no.
None
Travelers Indemnity Co.
9. Unit or lease name
SIMPCO East Moquawkie
10. Well number
2
11. Field and pool
Wi 1 dcat
Type Blanket
Surety and/or number 148F0140
Amount $200,000
13. Dislance and direction from nearest town
5 miles
16. Proposed depth (MD & TVD)
10,000' MD&TVD
19. If deviated (see 20 AAC 25.050)
KICK OFF POINT feet.
21
14. Distance to nearest property or lease line
-+1 5 00 feet
17. Number of acres in lease
feet 13,273
J 20. Anticipated pressures
MAXIMUM'RULE ANGLE "|{see 20 AAC 25.035 (c)
!
15. Distance to nearesl drilling or completed
well -+3800 feet
18. Approximate spud date
Mav !, 1984
3780 psig@ Surface
4900 psig@ ~ 0__~__0_0_0_0_0_0_~00~. TD {TVD)
Proposed Casing, Liner and Cementing Program
SIZE
Hole I Casing
2(')"
7 ~ ~/~
9 5,/R"
7"
Weight
c)4
~7
40r47
23:26
CASING AND LINER
Grade
14-55
N-BO
S-95
Coupling
Rt7tt
T.T&C
LT&C
.!
Length
2500'
7600'
2700'
MD TOP TVD
.~7 7 ~ 'f'~ Jrt::~
Surf~.e ,
!
-+7300 ~MD: TVD
I
I
SETTING DEPTH QUANTITY OF CEMENT
MD BOTTOM TVD (include stage data)
I
-+R~' ~D,TVD Driven - No C~m~n~
+_2$O0~_MD¢TVD See attachment
+_7600~ MD_TV~ See attachment
-+10:0~0 M~:T~D See attachment
22. Describe proposed program:
See attached Supplemental Data Sheet.
Proposed location plat is attached. As-built survey will be sumbmitted after
setting conductor.
Attached Surface Facilities Map shows the lease boundaries.
BOP Program:
Surface to 2500' - 20", 2000 psi, SA diverter system.
2500' to 10,000' (TD) - 13 5/8", 5000 psi, SRRA system with 2", 5000 psi choke
mani fold.
The space below for Commission use W. R. Stewart
CONDITIONS OF APPROVAL.
DATE
,7,-~ r~ F; 7 ct.qz/
Samples required
/[~Y ES []NO
-'P~rmi! number
APPROVED BY
84-8
Mud log required
FYES [~NO
Directional Survey required
[~YES
J AP_I n~_ mher
so -83-20072
SEE COVER LETTER FOR OTHER REQUIREMENTS
.COMMISSIONER DATE January 18, 1984
by order of ~he Commission
Supplemental Data Sheet
Application for Permit to Drill
SIMPCO East Moquawkie No. 2
I. Casing Program:
Conductor:
20", 94 lb/ft, H-40:
Surface Casing:
13 3/8", 61 lb/ft, K-55, ST&C:
Intermediate Casing: 9 5/8", 40 lb/ft, N-80, LT&C:
9 5/8", 47 lb/ft, N-80, LT&C:
Liner: 7", 23 lb/ft, S-95, LT&C:
7", 26 lb/ft, S-95, LT&C:
Driven to +80'
Surface to 2500'
Surface to 4700'
4700' to 7600'
7300' to 9000'
9000' to 10,000'
The casing weights and grades listed above are preferred.
At the time of purchase, however, it may be necessary to adjust
slightly depending on availalability. If adjustments are
necessary, the performance properties of the final design will
meet or exceed the designs listed above. The Alaska Oil and
Gas Conservation Commission office will be notified
appropriately in the event a deviation from the above design is
necessary.
II. Cementing Program:
A. The 13 3/8" surface casing will be cemented to surface
with 1000 sacks of Class "G" containing 4% dry blend gel
(includes 40% excess) followed by 800 sacks of Class "G"
containing 2% calcium chloride (includes 30% excess).
Duplex cementing technique will be used.
B. The 9 5/8" intermediate casing string will be cemented
with 700 sacks of Class "G" cement containing fluid loss
additives, turbulence inducer and retarder. This should
yield a 2000' cement column plus 30% excess. If
potentially productive horizons are encountered above the
projected cement top, a second stage cement job will be
performed through a DV collar.
C. The 7" liner will be cemented with 300 sacks of Class
"G" cement containing fluid loss additives, turbulence
inducer, and retarder. The liner hanger will be cement
squeezed with 100 sacks of Class "G" containing the
appropriate additives for cement squeezing.
Each cement job will be preceeded with a spacer fluid of
the proper weight, viscosity, and inhibitors for formation
stabilization. Actual cement volumes will be calculated
from open hole electric log caliper data.
III. Drilling Fluid Program:
Surface to 2500 ' - Benex-gel/fresh water
2500' to 10,000 (TD) - Low solids polymer system
IV. Anticipated Geology:
Ve
Surface to +250' -
+250' to +2750' -
· 2750' to--10,000'(TD) -
Formation Evaluation:
Gravel
Beluga Formation
Tyonek Formation
A. Standard mud logging equipment will be installed prior
to spudding and will be used throughout drilling.
B. One or more full size cores are anticipated to be cut
at intervals to be determined by the wellsite geologist.
C. Wireline logs run will include dual induction
laterolog, compensated sonic log, compensated density-
neutron log, and dipmeter.
D. Horizons of indicated hydrocarbon potential will be
tested by drillstem test procedures carefully minimizing
formation damage.
VI. Pressure Control Practices
Drilling history in the immediate area has indicated that
the pore pressure gradient at depth is about 0.49 psi/ft.
Applying this to the projected total depth, the maximum
anticipated bottom hole pressure is 4900 psi at 10,000'
TVD. In the remote possibility that the hole were to
become totally gas filled, the maximum surface pressure
would reach 3780 psi using a gas gravity of 0.75 (air =
1.0), which has been measured from DST recoveries on other
wells in the area. The "constant drill pipe pressure"
method (Drillers Method) will be the well control method
used on this well. This method results in the controlled
expansion of the "kick" as it is circulated out of the
wellbore minimizing potential surface pressures.
24
25
-- I' ' . r'-
]'~ I I I
it,...-......., I
I Ig ~ I ~o I ~l ,
! ( I I I
, i · I
-t---- -- --
' I I I
$o
I I
....
I PROPOSED I
EAST MOQUAWKIE No.~ I LAT : 61°04'41.30''
LON~. = I~1° 18'02.60" 33
I
iY= 2,595,867.57; jI T 12 N
i'
$
I
I
RESERVATIONI
I
I
,36
INDIAN
SCALE~ I": I MILE
CERTIFICATE OF SURVEYOR
,
I hereby ce'rtify thor I om properly registered end
licensed to proctice Iond surveying in the Store of Alosko end
.
thotthis plot representse Iocotion survey mede by me or
under my supervision, ond thet oll dimensions ond other-'
detoils ore correct.
, ~ ~. ~,
Dote SURVEYOR
PROPOSED
EAST MOOUAWKIE No.2
Located in
NE I/4 SEC 6 TIIN~ RIIW~ $,M,~AK,
Surveyed fcr
SIMASKO PRODUCTION CO.
Surveyed by
R.C. DAVIS 8~ ASSOC.
LAND 8~ MINERAL SURVEYORS
629 L. ST. -~2A - SRA BOX 5495-C
ANCHORAGE, AK.
17 " SURFACE HOLE BOPE DIVERTER ARRANGEMENT
Active Fluid
Level .
?i ll-up__.~.
Line
Kill
Line__~
Cellar
2
Flow
Line
20" Hydril MSP
divert'er
2000 s i
20"
drilli
spool
PROFILE VIEW
All turns to be
long-radius
Minimum of 4'
of freeboard
above active
fluid level.
6" (min.)
line pipe
air or
steam for
purging
To diverter
manifold
Inverted "U" Tube Diverter System
If a kick is experienced, closing the
Hydril diverter will immediately allow
the wellbore fluid to flow through the
inverted "U" tube to the diverter mani-
fold which always has one valve open.
Operation of the quick o~'ening butterfly
valves in the diverter manifold, to
control the direction of flow, is accomp-
lished manually.
To end of
reselve pit
Mech. Tee
~u~ck-open
[butterfly
valves
To end of
reserve pit
DIVERTER MANIFOLD
1. System is always open
to flow (no closed
valve) and is therefore
fail-safe.
2. System does not require
automating valves with
the BOP controls.
3. System is simple and
trouble free.
4. Outlet from the drilling
spool is sloped toward
the spool for self-
cleaning.
5. Entire system downstream
of "U" tube is sloped
toward reserve pit for
drainage.
6. System can be purged with
air or steam.
SIMPCO
EAST MOQUAWKIE
17 1/2' SURFACE HOLE
BOPE
DIVERTER ARRANGEMENT
pl AN VT~W
DRILLING
NIPPLE
ANNULAR
PREVENTER
la'/, '; 5000
IFILL LI~
1.
!
!
!
J
I I
(BLIND)
Est. 18' to ,
Rotary I I 36"
Beams [~ (PIPE) ~ 1
Is"/, ': 5ooop,i
[ 1
[ ,~%','5ooo! +_2"
.
20 , 2000
I , ,. IWeld CASIN(~
T ti al~?vo~erCeilor -I K
5000psi SRRA BOP ARRANGEMENT
ii
(WHILE I~ILLING 12~/4 ~ HOLE)
5 ii
13 Ye, 5000 psi SRRA BOP ARRANGEMENT.
(WHILE DRILLING B>2" HOLE)
DRILLING NIPPLE IFILL LINE
...rI 1
ANNULAR
PREVETER
1-25/,'
-~ ,e, 5000 psi 54~/a,,
I
13~, 5000
I
(BLIND) a6"
..
! !
(PIPE)
la%'; 5000 psi
i I
Est. 18' to j , N,:5ooo J
Belms DRILLING
SPOOL t24"
Top of |
+ 4" TUBING
SPOOL
-x..~.~~
!29" CASING
SPOOL
/
--
2o': 2000
t' [Weld ASING
+ I above cellar floor~I
CHOKE
5000 PSI
MANIFOLD
WORKING
SCHEMATIC
PRESSURE
Kill Line Valves [.
i
tBOP
DRILLING
SPOOL
Wellhead
%"Nominal ///~'/q -/,zJ, ,~, 3' 7'~F~//'/~ r
t-il-gq
(2) 3" x 2"
psi crosses~
Hand _ T _ -4- Hand
.......... Chok
Choke ~ ,2"' V '2",,+~ e
I. AIl valves to be full- opening. --~ :3 ~ ~
To To ~o
2. All valves to be 5OOOpsi rated. Degasser Reserve Degasser
And Pit Or
Reserve
3. All manifold components to be Mud Tanks Pit
ring-joint flanged.
Remote Operated
Hydraulic Choke
_
O eg asset
And
Mud Tanks
,L
Simasko Production Company
ANCHORAGE DENVER
SIMPCO
EAST MOQUAWKIE '~2
BOPE FOR 12 1/4' & 8 1/2' HOLE
SCALE DR. AMS
DATE dAN. 1~84 CK'D BA
Est. 18' fo
Rotary
Beams
DRILLING
NIPPLE
Il
ANNULAR
PREVENTER
1:3't, '; 5000
5ooo
DOUBLE GATE
RAMS
(BLIND)
! !
FILL UNE
(PIPE)
1:3% '; 5000psi
I
J
q t O_+cti~ll ~/. 35/' ': 5000
I
J 20"
, 2000
I CASING
~' . ,,~ JWeld ' CASING
~' ti al~?V~rCellar-I K
13'~8", 5000psi SRRA BOP ARRANGEMENT,,
(WHILE DRILLING 121/4 ~ HOLE)
Est. 18' to
Rotary
5 ii
13 78, 5000 psi SRRA BOP ARRANGEMENT
(WHILE DRILLING 8~:~"HOLE)
NIPPLE
..1
,1
ANNULAR
PREVETER
13~/.'', SO00 psi 54 ~/s"
I ,:3%'; 5ooo i
I
DOUBLERAMS GATE
(BLIND)
! I
(PIPE)
13%': 5000 psi
I J
J 13%';5ooo j
Deltas
Top of J
Cellar ~ ~
DRILLING
SPOOL
IO'~ 5000
t_ 29"
I0'~ 5000
TUBING
SPOOL
J 1:3%';5ooo
95/$"
CASING
SPOOL
20'¢ 2000
above ~elia-7 floor.
20"
CASING
t 24"
CHOKE
5000 PSI
MANIFOLD SCHEMATIC
WORKING PRESSURE
I. All valves to be full-opening.
2. All valves to be 5000psi rated.
All manifold components to be
ring-joint flanged.
tBOP
DRILLING
SPOOL
We I I head ~
" Nominal
(2) 3" X 2"
5000 psi crosses,~
Pressure Gouge ~ 2'-~
Hand ~~] ~ ~_~ [~ Hond
Adjust
Adjust-,x
Choke / ~ 2"' V Choke
To To To
Degosser Reserve Degosser
And Pit Or
Mud Tanks Reserve
Pit
Remote Operated
Hyd roulic Choke
Degosser
And
M~d Tanks
,=
Simasko Produclion Company
ANCHORAGE DENVER
SIMPCO
EAST MOQUAWKIE '~2
BOPE FOR 12 1/4' & 8 1/2' HOLE
SCALE DII. AMS
DATE dAN.la84 CK'D. BA
ROVE DATE
__
(2) "Lo~ 46'----, 1"/0"~'
~(2 thru 8)
/- / /-
·
(3) Admin (~ ~-,,---/- / 0 -~'~
('9 thru i~
'(10 and 11)
(4) Casg ~
(12 thru 20)
..
i~ELL PERMITS_
.... -... ,,. : ~,:,,'.: .
YES
NO
1. Is th~ e attached .......................................
2. Is well to be located in a defined pool ............................
3. Is well located proper distance from property line .................. ~'~.~:~'
4. Is well located proper distance from other wells ....................
5. Is sufficient undedicated acreage available in this pool ....... - ....
6. Is well to be deviated and is well bore plat 'included .............. '~-- --'---
7. Is operator the only affected party ................................
8. Can permit be approved before ten-day wait ..........................
·
Does operator have a bond in force ..................................
Is a conservation order needed ......................................
Is administrative approval needed., .................................
®
10.
11.
Is conductor string provided ... ..................................... .~
Is enough cement used to circulate on conductor and surface.. ...... ...
Will cement tie in surface and intermediate or production strings ...
Will cemen~ cover all known productive horizons .... '
Will surface casing protect, fresh water zones .... i2~ i~
Will ali casing give adequate safety in collapse, t~s bu:st.. ':'
Is this well to be kicked off from an existing we.llbore ............. ~.
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate well bore separation proposed ...........................
12.
13.
14.
15.
16.
17.
18.
19.
20.
(21 thru 24)
21.
22.
23.
24.
Is a diverter system required .................................... .. ~
Are necessary diagrams of diverter and BOp'equipment attached .~,
Does BOPE have sufficient pressure rating - Test to ~z~zrZ) psig .
Does the choke manifold comply w/API RP-53 (Feb.78) ........... , ......
(6) Add: ~ /-//'z~"/
25. Additional reqUirements .............................................
(D
Geology: Engineering
:cs
JAI_~____~~ --
rev: 12/08/83
INITIAL GEO. UNIT ON/OFF
poOL CLASS STATUS AREA NO. SHORE
Gao.-;' "z,o --- o