Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout175-041Surveillance Data on Class II Injection Wells.
Sw Name
Active Wells
GC-1D
GC-1D
GC-1D
GC-1 E
GC-1E
GC-1E
GC-2C
GC-2E
GC-3D
GC-3D
H-03
H-03
H-03
H-03
H-03.
H-03
CC-2A
CC-2A
Run Date
Well Operation Code Comments
09/02/88
10/27/88
06/19/89
07/08/89
07/27/89
06/19/93
12/13/88
08/07/78
04/18/90
05/05/88 WNO
06/11/88 WRO
05/03/89 STA
10/02/89 STA
03/21/90 CAL
05/10/90 STA
11/04/94
12/11/98
STA
FLM
TMP
STA
TMP
CAL
FLM
TMP
TMP
SRT
SRT
Static pressure/temperature survey/
INJECTION PROFILE/TEMP
TEMP/CCL
Static pressure/temperature survey/
BAD 9 5/8" CMT JOB
KINLEY caliper log
SPINNER/TEMP
No surveillance
TEMP/AMERADA
TEMP/CCL
CMT PLUG TO P&A
CONVERT H-3 TO RESERVE PIT DISPOSAL WELL
Static survey
Static survey
KINLEY CALIPER
Static survey
Step Rate Test
Step Rate Test
1/12/99 as
Surveillance Data on Class II
Injection Wells.
Sw Name
Inactive Wells
GC-1A
GC-1A ~$,, 0tl
GC-1A
GC-1B
GO-1B
GC-1C
GC-lC
GC-1C
GC-1C
GC-1C
GC-lC
GC-1C
GC-1C
GC-2A
GC-2A
GC-2A
GC-2B
GC-3A
GC-3A
GC-3B
GC-3B
GC-3B
GC-3B
GC-3B
GC-3B
GC-3B
GC-3B
GC-3B
GC-3B
GC-3B
GC-3B
Run Date
Well Operation Code Comments
04/20/80
08/31/87
01/06/88
07/14/83
O7/2O/83
O7/27/82
11/01/84
11/01/84
11/02/84
11 / 1 O/84
11/10/84
03/26/89
06/15/89
12/07/75
08/22/78
04/21/80
TMP TEMP/CCL
TMP TEMP/CCL
WNO P&A
TMP TEMP/AMERADA
WRO PLUG & ABANDON
CAL KINLEY 4-ARM
TMP TEMP/CCL
FLM SPINNER
FLM SPINNER
TMP TEMP/CCL
FLM SPINNER
STA Static pressure/temperature survey/
WRM PLUG & ABANDON
TMP TEMP/CCL
TMP TEMP/CCL
TMP TEMP/CCL
11/20/78
05/15/88
05/19/78
08/07/78
08/22/78
08/26/78
09/01/78
10/11/78
10126178
12/06/78
12/19/78
12/23/78
02~23~79
05/21/79
FLM
WRO
NEU
TDT
TDT
TMP
TMP
TDT
TMP
TMP
TMP
TMP
TMP
TDT
No surveillance
FLOWMETER INJECTION TEST
PLUG & ABANDON
CNL O/H
TDT-M
TDT-K
TEMP/CCL
TEMP/CCL
TDT-K
TEMP/CCL
TEMP/CCL
TEMP/CCL
TEMP/CCL
TEMP/CCL
TDT-M
1/12/99 as
Sw Name
GC-3B
GC-3B
GC-3B
GC-3B
GC-3B
GC-3C
GC-3C
IGC-3C
GC-3C '~ 8- 0~,~.
GC-3C
GC-3C
Run Date
05/29/79
10/12/79
01/27/80
09/07/81
08/15/82
08/08/78
04/24/80
09/13/85
09/14/85
11/02/85
08/27/87
Surveillance Data on Class II Injection Wells.
Well Operation Code Comments
TMP TEMP/CCL
TMP TEMP/CCL
PBU Pressure Build-up survey
TMP TEMP/CCL
WRO PLUG AND ABANDONED, ATC, F/O FAILURE
TMP TEMP/AMERADA
TMP TEMP/CCL
TMP TEMP/CCL
TMP TEMP/GRAD/HP
TMP DIFF. TEMP.
TMP TEMP/CCL
1/12/99 as
Standard Alaska
Production Company
900 East Benso'n Boulevd
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 564-5111
STANDARD
ALASKA PRODUCTIO
June 26, 1986
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Water Disposal Well GC-2A (16-11-13)
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations,
for the above-named well. This contains our subsequent report of
perforating the well.
Yours very truly,
SLB:JAM~
Enclosures (4)
cc: J. L. Haas (MB12-1)
Well Records (LR2-1) w/10
GC-2A Well File
S. L. Bryant, Supervisor
Reservoir/Production
Surveillance Unit II
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
STATE OF ALASKA '"~
ALASKA _ AND GAS CONSERVATION COMMI, ~N
REPORT OF SUNDRY WELL OP£1-1ATIONS
1. Operations performed: Operation shutdown [] Stimulate [] Plugging ,.~ Perforate [] Pull tubing
Alter Casing ,~ Other ~
2. Name of Operator 5. Datum elevation (DF or KB)
STANDARD ALASKA PRODUCTION COMPANY KBE = 72.8 Feet
3. Address 6. Unit or Property name
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit
4. Location of well at surface
1749' SNL, 1780' EWL, Sec. 16, TllN, R13E, OPM
At top of productive interval
7. Well number
GC-2A (16-11-13)
8. Approval number
At effective depth
At total depth
Vertical water disposal well
N/A
9. APl number
50-- 029-20167
10. Pool
Prudhoe Oil Pool
11. Present well condition summary
Total depth: measured
true vertical'
5665 feet Plugs (measured)
feet
Effective depth: measured
true vertical
feet Junk (measured)
feet
Casing
Structural
Conductor .
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented
60' 20" 250 sx
2142' 13 3/8" 6900 sx
2006' 9 5/8" tieback string
2388'
measured
3975'-4026'
true vertical
7" 933 Sx
, 4066'-4132", 5167'-5257'
Measured depth
104
2186
2050'
2050'-5662'
True Vertical depth
12.
Tubing (size, grade and measured depth)
4 1/2" J-55 to 2529'
Packers and SSSV (type and measured depth)
7" Baker FB-1 packer at 2520''
Stimulation or cement squeeze summary
Intervals treated (measured)
RECEIVED
JUIV 2 ? 3986
Anchot~,e ,.,o
Treatment description including volumes used and final pressure
13.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
3000
22000
Tubing Pressure
2000
14. Attachments
Daily Report of Well Operations
Copies of Logs and Surveys Run []
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
Form 10-404 Rev. 12-1-85
Title Supvr. Res./Prod. Surveillance II Date ~/~/dm~
Submit in Duplicate
PERFORATING DATA: Water Disposal Well GC-2A
Subsequent to our Sundry Notice of Intent dated 10/3/78, the following
additional intervals were perforated on 10/20/78 using Schlumberger
2 7/8" Hyperdome guns at 4 spf:
3975' - 4026' MD
4066' - 4132' MD
A lubricator was installed and tested to 2000 psi for all well work.
jm
6/24/86
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO: State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Dr.
Anchorage, AK, 99509
Attn: Mr. H. Hamilton
REFERENCE:
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
GC.2Astate Sundry Notice - Intention to Shoot or Acidize
Colette 'l'ra y
Well Records
RECEIVED
19
DATE
SOHIO PETROLEUM COMPANY
Division of SOhio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
3111 "C" STREET
ANCHORAGE, ALASK
TELEPHONE (907) 265-0
MAI L: POUCH 6-612
ANCHORAGE, ALASKA 9
October 3, 1978
State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservatio~{~~
3001 Porcupine Drive
Anchorage, Alaska 99509
Attn: Mr. H. Hamilton
Subject: GC-2A (16-11-13)
Division Of 01t & ~ Com~rvatton
Gentlemen:
Please find attached in triplicate Form 10-403, Sundry Notices
and Reports on Wells for the above mentioned well.
Very truly yours,
SOHIO PETROLEUM COMPANY
By C4"
Distr'i~ct Field Engineer
GJP: j lh
Attachment
cc: M. J. Smith
Drilling File
Subm! t "1 ntentions" in Tripllca te
& "Subsequent RepOrts" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
5. APl NUMERICAL CODE
50-029-20167
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28284
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
~' o~L I--] GAS r-']
WELLL-J WELL OTHER Water Disposal
NAME OF OPERATOR Sohio Petroleum Company
A Division of Sohio Natural Resources Inc.
3. ADDRESS OF OPERATOR
Pouch 6-612, Anchorage, Alaska 99502
4. LOCATION OF WELL
At surface
1749' SNL, 1780' EWL, Sec. 16, TllN, R13E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, et~)
KBE 72.8' AMSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit West
9. WELL NO~
GC-2A (16-11-13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, ?rudhoe 0il ?oo'
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 16, TllN, R13E, UPM
. .
]2. PERMIT NO,
75-41
3ort, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZlNG ABANDONMENT*
(Other)
(NOTE'- Report. results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent datalls, and give pertinent dates, Including estimated date of
starting any proposed work.
The following intervals in this well will be perforated during October using
Schlumberger 2%" .guns, @4 s.p.f.
~" 3975 - 4026 Ft. BKB (Ref. CBL/Gr 10-25-78)
,~ 4066 - 4132 " " (" " " )
Upon completion of perforating injection performance will be monitored
for a period of time.
16. ! hereby certl~ha~~ls true and correct
SIGNED ..... '' ' ~4' DATE ,, ....
{This spa~ce f(;r State~-ot~fic; use) '
APPROVEDB' .~* Q. %'~-~'~----~~-'/TITLE- · Petrole~ EnaJn..r DATE
' CONDITIONS OF APPROVAL, IF AN~ · -
See Instructions On Reverse Side
SOHIO PE-~.,_-,OLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO:
State of Alaska
Department of-Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, A1~ka 99504
ATTN: MR. H. HAMILTON.
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH ::; 612
ANCHORAGE, ALASKA 99502
DEV-?B-250/6/7/8
October 3, 1978
REFERENCE:
The following material is being submitted herewith. Please acknowledge receipt by signing a
.copy of this letter and returning.it to this office:-
V/A-3 Transient Pressure Survey 6-4-78
* ~--m~-: · ~ ---., ~ ~ r~--v- -
Logs for the following, wells:
~GC-3B Engineered Prod. Log - Gradio, FBS, Temp.
'~Engineered Prod. Log - HP, FBS, Temp, Tracer
- Engineered Prod Log Gradio, Temp, FBS
~H-6 Engineered Prod. Log - Gradio, Temp, FBS
Run 2,3 5"
Run 1 5"
Run 1 2" & 5"
Run 1 2" & 5"
RECEIVED
OCT 4 t97§
~ivlsi0n 0f 0[I & G~ 60n~ervatic
Colette Tracy
Well Records
R.CE,VEO /bi-(./.~.~ ¢'X
/
Redi-Kwik, Quality Litho
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
State of Alaska
Department of Natural Resources
Division of Oil and Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Hoyle H. Hamilton
Director
3111 "C" STREET
ANCHORAGE, ALASKA
,,0,, .ooo1
Gentlemen:
Well GC-2A (16-11-13)
Enclosed, in duplicate is Form P-7, Completion or Recompletion
Report for the above named well, together with the Well History
and Casing Record.
Very truly yours,
SOHIO PETROLEUM COMPANY
District Drilling Engineer
PRJ:rb
Enclosures
Form
SUBMIT IN DUI~_ .gATE*
STATE OF ALASKA ,'see other in-
structions on
OIL AND GAS CONSERVATION COMMITTEE reve,'se side,
WELL cOMPLETION OR RECOMPLETION REPORT AND LOG*
I
t.. TYPE OF WELL: OIL ~] ~*S ~-1 DRY ~1 Other Water Disoo.~al
WELL WELL ~
b. TYPE OF COMPLETION:
NEW [---] WOBK '
EN EESVR. :
WELL
2. NAME OF OPERATOR
Sohio Petroleum Co, Div. of Sohio Nature,% Resources
3. ADDRESS OF OPERATOR
' Pouch 6-612~ Anchora~a. Alaska qqs02 '
~. LOCATION OF WELI~- (-Re~ort locatto~ cl-early and in accordance with any ~tate requirem,nts)*
At surface 1768' EWL, 1702' SNL, Sec. 16, TllN, R13E, UPM
At top prod. interval reported below
At total depth of' 5570'
5. API NU1W. EH~ CODE
50-029-20167
~. LF-J~SE DESIGNatIOn' A-ND SERIAL NO.
ADL 28284
?. IF INDIA.N, A/J~OTTEE OR TRIBE NA/VI~
8. UNIT,F~H~ OR LEASE NAME
~ Prudhoe Bay Uni~
9. WELL NO.
GC-2A (16-11-].3)
10. FIELD A2/D POOL, OR WILDCAT
Prudhoe Bay Field
11. SEC., T., R., M,, (BOTTOM HOLE
OBJECTIVE)
Sec. 16, TllN, R13E, UPM
12. PEI~VIIT NO.
1780' EWL, 1749' SNL, Sec. 16, TllN, R13E, UPM 75-41
10-4-75 i 10-20'75 ! 8-7-78 ! KBE= 72.8' AMSL_ 143.6' AMSL
IF i~JLT]~LE COMPL., ~iNTERYALS DRILLED BY
· ¢57~., aow~¥. ~O~R, ~00LS c,.~. ~ooL~
.. Tnt~l
~ SURV~ ~DM
None ' '~; y~
,
24.~ ~ ~C~IC ~D OT~ ~ g~N
iDIL/SP, CBL/VDL/GR, C~/~liper
: :ii: .CASING RECORD (Report all strings set in well)
CASm~ S~Z~ WEmHT: n.~n~ SET. (M~ HOL~
see a~a( bed record
,:
26. LINER I~ECO~
28. PEI~FORATIONS OPF/N TO '.i~j-act:ibn(inm~a, si~e and number)
5167' - 52'57' BKB ....
I I
~o. PRODUCTION
CE~ILNTING RECOlq,D ! AMOU/~T PULLED
27. TUBING RECOI:~D
SC~ (MD) SIZE DEPTH SET (MD) PACKER SET (MD)
, ,~
4~ 2520' 2520'
2.9. ACID, Si-~OT, Ff~C'I'LrHE, CEa~ENT SQUtIEZE, ETC.
Dlili:~l-I INTI/IRVAL (MD) I AMOUN:I~ ~'~ID KIND O,F MASSEuR/AL USED
DATE FIRST PI~ODUCTION [ PI~oDUCTION METHOD (Flowh~.g, gas Iii't, pumping--size and type of pump)
DATE OF TEST, HOURS TESTED : [CHOI{E SIZE [PROD'N FOR OIL--BBL. GAS~iV/CF.
TEST PERIOD
~'~0TM, TUBING: CASING PP,~-,SS~ CALC'0'I.~ OIL~BBL. GAS--!~CF.
PIqUeS.31I. 'D'ISPOSITION 'used ' ~u [
' 24-HOUR RA~ ~
O~ aAS (8old, )or eI, vented, etc.)
·
o~'
32. LIST ATTACHMENT8
WELL STATUS (Producing or
~nut-in).
iWATF-AR~BBL. l GAS-OIL H3~TIO
· , '~, ~ 'L '.i i ~ _,
TEST WI~E~[D BY : -'
(CORR,)
Workover History,'~CaSin~ Records ,~. ..... , .
33. I hereby certff~ached information is complete and correct as determi/r~d
S ICNED . p, ~a~ : ' ' ,I,L. District Drilling E~gi~e~r
I I
*(See Instructions and S~ces Jar Additional Data on Reyerse..~ide)
, ~ ~.~, 7 ' L'~.~ ...... ~ ' ~
INSTRUCTIONS
General: This form is designed for submitting a complete arid correct well completion report end log or',
all types of lands and leases ir', Alaska.
Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure-
merits given in cther spaces on this form and in any attachments.
Items 20, and :2'~:: If this well is completed for separatc, prcduction from more than one interval zone
(multiple completion), so state in item 20, and ir') item 22 show the prc. Jucir~.g interval, or intervals,
top(s), bottom(s) and name (s) (if any) for only the interv~l reported in item 30. Submit a separate report
(page) on this form, adequately identified, for each additional interval to be seperately produced, show-
ing the ack~itional data pertinent to such interval.
Ite, m'~: "Sacks Cement": Attached supplemental records for this well should show the details of any mul-
tiple stage cementing and the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each interval to be separately produced.
(See instruction for items 20 and 22 above).
WATt, il AND MUD
_
NAMlg
BKB SS
Tertiary Sand
Tertiary Sand I 2622' 2550'
Tertiary Sand II 3096' 3024'
Tertiary Sand III 3290' 3218'
(Zone A)
Upper Cretaceous 5110' :~ 5038'
~ ,..--:.:~,.,.'.'~. - . ., ~. ,~' . , ............... Zone E
A~u .~*r~n'~,, '~'m~S O~ om. C~ 6~ wXn~.
.
Well GC-2A (16-11-13)
Workover History
August, 1978
Accepted rig 1900 hrs. 8-1-78. Installed and tested BOPE.
Pulled 4½" tubing and packer. Cleaned out to 5568'. Changed well
over to 8~6 ppg CaC12. Performed injection test, backflowed well,
reran injectivity test. Ran 79 jts. 4½" 12.75# CS-CB Hydril
plastic-coated tubing and packer tailpipe assembly. Had difficulty
setting packer, pulled tubing and packer. Pulled 7" heater string.
Ran 4½" Baker packer and tailpipe assembly, set packer at 2520'.
Reran 7" heater string. Reran 4½" tubing and landed. Displaced
4½" x 7" annulus to 10.2 ppg CaC12 below 7" heater string. Circulated
glycol around 7" heater string. Ran dummy gun. Released rig 2400 hrs.
8-7-78.
Well GC-2A (16-11-13)
Casing Record
Casing_ Size Weight, LB/Ft. Grade
20" 94f/ H-40
13 3/8" 72f/ .... N-80
9 5/8" 47fi N-80
7" 29~
7" 29~ N-80
Depth Set (MD)
100'
2186'
2050'
.... 5662'
2025'
Hole Size
26"
18%"
tieback
8%"
Cementing Record
400 sx Permafrost
7150 sx Arcticset
Annulus to Arcticpack
933 sks
heating string, circulating glycol
Amount Pulled
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
State of Alaska
Department of Natural Resources
Division of O~1 and Gms Conservation
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Hoyle H. Hamilton
Director
3111 "C" STREET
ANCHORAGE, ALASK
TELEPHONE (907) 265-(] )00
MAIL: POUCH 6-612
ANCHORAGE, ALASKA ~ )502
August 17, 19~8
.... ........... ?:! .¢,¢/
,?,¢ ~,' ; ,~,?:: .;, ?'" I.--
Gentlemen:
Well GC-2A (16-11-13)
Enclosed, in duplicate is Form P-4, Monthly Report of Drilling
and Workover Operations, for the above-named well for the month
of August, 1978.
PRJ:rb
Enclosures
Very truly yours,
SOHIO PETROLEUM COMPANY
P. R. Judd
·
District Drilling
~:i
,
', , ,
Form No. P-4
REV. 3-1-70
SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. APl NUMERICAL CODE
50-029-20167
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28284
1. 7. IF INDIAN'ALOTTEE OR TRIBE NAME
OIL F-~ GAS [] Water DisPosal Well
WELL WELL OTHER
2. NAME OF OPERATOR S. UNIT FARM OR LEASE NAME
Sohio Petroleum Co., Div. of Sohio Natural Resources CO. Prudhoe Bay Unit
3. ADDRESS OF OPERATOR 9. WELL NO.
Pouch 6-612, Anchorage, Alaska 99502 G¢-2A (16-11-13)
4. LOCATIONOFWELL
at surface:
1768' E~,
1702' SNL, Sec. 16, TllN, R13E, UPM
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay Field
11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE)
Sec. 16, TllN, R13E, UPM
12. PERMIT NO.
75-41
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
.August ,..!.9..78
Accepted rig 1900 hrs. 8-1-78. Installed and test BOPE. Pulled 4½" tubing
and packer. Cleaned out to 5568'. Changed well over to 8.6 ppg. CaC12.
Performed injection test, backflowed well, reran injectivity test. Ran 79 jts.
4½" 12.75# CS-CB Hydril plastic coated tubing and packer tailpipe assembly. Had
difficulty setting packer, pulled tubing and packer. Pulled 7" heater string.
Ran 4½" Baker packer and tailpipe assembly, set packer at 2520'. Reran 7" heater
string. Reran 4½" tubing and landed. Displaced 4½" x 7" annulus to 10.2 ppg
CaC12 below 7"heating:string. Circulated glycol around 7" heater string. Ran
dummy gun. Released rig 2400 hrs. 8-7-78.
14. I hereby foregoing is and correct
TITLE
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
State of Alaska
Department of Natural Resources
Division of Oil and Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99504
3111 "C" STREET
ANCHORAGE, ALASK~
TELEPHONE (907) 265-~000
MAIL: POUCH 6-61~
ANCHORAGE, ALASKA ~195~2 ~,
July 12, 197~
Attention: Mr. O. K. Gilbreth
Director
Gentlemen:
Water Disposal Well GC-2A (16-11-13)
Enclosed, in triplicate, is Form 10-403, Sundry Notices
and Reports on Wells for the above-named well. This report
contains our proposal to repair the well.
Very truly yours,
SOHIO PETROLEUM COMPANY
PRJ:AMR:ja
Enclosures
cc: Well File #17
P. R. Judd
District Drilling Engineer
1978
AdchOre~
[l='orm~ ],[)-*403
REV. 1-10-73
Submit ,'Intentions" in Trlplicate
& "Subsequent Reports" In Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
~' O,L I--1 GAs [--]
WEL,-,.--, wEL~.OTHER
Water Disposal Well
NAME OF OPERATOR
Sohio Petroleum Company, Div. of Sohio Natural Resources
ADDRESS OF OPERATOR
Pouch 6-612, Anchorage, Alaska 99502
4. LOCATION OF WELL
At surface
1768' EWL, 1702' SNL, Sec. 16, TllN, R13E, UPM
ELEVATIONS [Show whether DF. RT, GR, et~)
KBE = 72.8' AMSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re]
NOTICE OF INTENTION TO:
5. APl NUMERICAL CODE
50-029-20167
6. LEASE DESIGNATION ANO SERIAL NO.
ADL 28284
!7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEAS~' NAI~I'E
Prudhoe Bay Unit West
9. WELL NO.
GC-2A (16-11-13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay Field'
11. SEC.,T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 16, TllN, R13E, UPM
12. PERMIT NO.
75-41
~ort, or Other Data
SUBSEQUENT REPORT OF =
r----1
r---1
TEST WATER SHUT-OFF L-~ PULL OR ALTER CASING ~
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT OR AClDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other)
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
_ _
(NOTE= Report results of multiple completion on Well
COmpletion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent detalls, and give pertinent dates, Including estimated date of
starting any proposed work. ' .........................................
We propose to enter this well approximately August 5, 1978 to remove the
tubing and injection packer from 4966', clean out the well to 5500'±, and
install a new packer and injection tubing at 2600'±. The glycol circulating/
heating string will be left with non-freezing fluid through the permafrost.
?
16. I hereby certify that the foregoing is true and correct
SIGNED F.' Ro "Judd
'TITLE District Drilling E.ng~ DATE.
(This space for State office use)
CONDITIONS OF APPROVAL, IF AN~.
Petroleum Engineer
See Instructions On Reverse Side
DATE
7/21/78
Approved Copt
Returned
7/21/78
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
3111 "C' STREET~
TELEPHONE (907)265-0000
SOHIO-BP ALASKA PRODUCTION DIVISION
State of Alaska
Department of Natural Resources
Division of Oil and Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99509
.,
~'e"b'~'uary 14, 1978.,
:,
MAIL: P.O. BOX4-1379
ANCHORAGE,
ALASKA
~ ,-'
· ,.
.... :.r ~.t_
C4:AFT
, .~-..- ~
,..
ATTN: Mr. O.K. Gilbreth, Jr.
Gentlemen:
H~2 (41-21-11-1'3)
J-3 (23-04-11-13)
GC-2B (16-11-13)
~6-11-13)
Enclosed please find 'in triplicate, form 10'403, Sundry Notices and
Reports on Wells, and in'duplicate, form P-4, Monthly Report of Drilling
and Workover Operations, for the above mentioned wells.
Very truly yours,
Sohio Petroleum Company
G. I). Taylor
Manager Operations
GP:bs
cc: P.E. Well files
Drilling Well files
Form 10-403
REV. 1-10-73
Submi t "1 ntentlons" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proPosals to drill or to deepen
Use "APPLICATION FOR PERMIT---" for such proposals.)
WELLL..J WELL
2. NAME OF OPERATOR
OTHER Water Disposal Well
SOHIO PETROLEUM COMPANY
A DIVISION OF $0BIO'NATURAL RESOURCES COMPANY ,.
.
[ AODRE~S OF OPERATOR
P.O. Box 4-1379 Anchorage,. Alaska 99509
LOCATION OF WELL ·
At surface
..... 1768' ~L, 1702' SNL, SEC. 16~ ~11~, A13g, O~.
ELEVATIONS (Show whether DF, RT, GR, et~)
~;~.~ .... : ._ KBE 7 2.8' AMSL
..
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20167
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28284
7. IF INDIAN, ALLOTTEE OR TRIBE. NAME
8. UNIT, FARM OR L~AsE'-NA'ME
, ]~iRUDHOE BAY .UNIT WEST
9. WELL NO.
GC-2A, (i6-11-i3)
10. FIELD AND POOL, OR WILDCAT
PRUDHOE OIL POOL.. PRUDHOE ~,_AY
'il. SEC., T.~ R., M.; (BOTTOM-HOLE OEIJECTI~/E)'~
·
SEC. 16, TllN, Ri3E, UPM
12. PERMIT NO.
75-41
)ort, or Other Data
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
NOTICE OF INTENTION TO:
PULL OR ALTER CA~iNG
· MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAI'RING WELL '
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZI NG ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent detall~, and give pertinent dates~ Including estimated da'te'ot ' '~
starting any proposed work.
The following Work will be done on this well to improve injectivity:
1. Perforate 5125-5145 BKB
2. Inject 420 gallons 50% U42. Allow well to stand for 36 hours.
3. Inject 420 gallons 30% U42. Allow well to stand for 36 hours.
4. Displace well to fresh water and overdisplace by 50 bbls.
This work is scheduled for February 1978.
t.
16. I hereby certify t~he~oregolng, is true and correct
·
(This space for State office Use)
CONDITION5 OF APPROVAL, IF ANY:J
TITLE
Petroleum Engineer
See Instructions On Reverse Side
DATE
DATE
3/i/78
Approved ~.op~
.
SOHIO PETROLEUM COMPAI"',i¥'
Division of SOHIO NATURAL RESOURCES COMPANY
SOHIO- BP ALASKA PRODUCTION DIVISION
January 16, 1978
state of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 porcupine Drive
Anchorage, Alaska
AETENTION: Mr. D. K. Gilbreth
311 1 "C" STREET
ANCHO RA¢-~E, ALASKA .
TELEPHONE (907) 265- 0'601" ~:" %.~:' . ?.~'
MAIL: P.O. BOX 4-137'9-'i"-7.'
...~.
:
~nclosed please find in triplicate Form 10-403, Sundry Notices and
Reports on Wells, and duplicate Form P-4, Monthly Report of Drilling
and workover operations for the above named wells.
Very truly yours,
SOHIO PETROLEUM CC~P~
DMSICI~ OF SOHIO NATURAL RESOURCES
CO .nNY /,
G. D. ?aylo~
Manager Operations
GDT: mgm
cc: PE Well. File D-1
PE Well File D-3
· PE 'Well File GC-2A
Drilling Well File D-1 '
Drilling Well File D-3
Dri]'ling Well File GC-2A
Form 10-403
REV. 1-10-73
Submit "1 ntentlons' In Triplicate
"Subsequent Reports" In Duplicate
STATE Ct- ALASKA
OIL AND GAS CONSERV/~TION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
WELLL--J WELL L-J OTHER Water Disposal Well
2. NAME OF OPERATOR
SOHIO PETROLEUm4 COMPANY, DIV. OF SOHIO NATURAL RESOURCES CO.
3, ADDRESS OF OPERATOR
P; O. Box 4-1379 Anchorage, Alaska 99509
4. LOCATION OF WELL
At Surface
1768' EWL, 1702' SNL, SEC. 16, TIIN, R13E, UPM
13, ELEVATIONS (Show whether DF, RT, GR, etc.)
KBE. = 72.8 ' 'AMSL
Check Appropriate Box TO Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20167
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28284
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
PRUDHOE BAY UNIT WEST
9. WELL NO.
C~-~ (16-11-13)
10. FIELD AND 1~3OL, OR WILDCAT
11. SEC., T., RD, M., {BOTTOM HoLE OBJECTIVE)
SEC. 16, TIIN, R13E, UPM
12. PERMIT NO,
75-4]
)ort, or Other Data
NOTICE OF INTENTION TO:
FRACTURE TREAT MULTIPLE COMPLETE
~ AClDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other)
SUBSEQUENT REPORT OF-'
WATER SHUT-OFF [~ REPAI RING WELL
FRACTURE TREATMENTH ALTERING CASING
SHOOTING OR ACIDIZlNG ABANDONMENT*
(Other)
(NOTEz Report results of multiple completion on Well
Completion or Recompletlon Report and Log form.)
34.
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent ¢letalls, anti give pertinent dates, Including estimated date of
starting any proposed work.
A stimulation using 15% HCL will be done on this well to decrease the injection
pressure. The work is proposed as follows:
1. Pump 2500 gals. 15% HCL*with 2 gals/1000 A-170, 7 gals/1000 w-35, 10% U-66.
2 Displace acid using fresh water with ~verter over displace by. 30 BBLS.
The injection pressure will not exceed 1200 psi during the stimulation.
16. I hereby certify that the-foregoing Is true and correct
(This space for State'office[use)
CONDITIONS OF ~~A'~'~I'F
See Instructions On Reverse Side
Approvec~ CoD'¢
LIST OF ATTACHMENTS
'INJECTION AND PRODUCTION TESTS
CRETACEOUS "A" AND "E" SANDS
BP WELLS GC-2A AND GC-2B
· ~ttachment
Attachment 2
Attachment 3
Attachment 4
Attachment 5
Attachment 6
Attachment 7
Attachment 8
Attachment 9
Attachment 10
Attachment 11
Attachment 12
Attachment 13
Attachment 14
Attachment 15
Attachment 16
Attachment 17
Attachment 18
Attachment 19
Attachment 20 .
Attachment 21
Attachmedt 22
Attachment 23
Attachment 24
Attachment 25
Attachment 26
Attachment 27
Diary of Events
Injection Data Summary - Cretaceous "E" Sand - GC-2A
Injection Data Summary - Cretaceous "A" Sand - GC-2B
Production Data Summary - Cretaceous "E" and "A" Sand~ -
GC-2B ,
GC-2A: "E" Sand Injection Test No. 1
GC-2A: "E" Sand Injection Test No. 2
GC-2A: "E" Sand Injection Test No, 3
GC-2A: "E" Sand Step Rate Injectivity Test
GC-2A: "E" Sand Injection Test No. 5
GC-2A: "E" Sand Injection Test No. 5 Pressure Fall-Off
GC-2A: "E" Sand Injection Test No, 6
GC-2A: "E" Sand Injection Test No, 6 Pressure Fall-Off
GC-2A: "E" Sand Injection Test No, 7
GC-2B: "A" Sand Injection Test
GC-2B: "E" Sand Production Test No, 1
GC-2B: "E" Sand Production Test No. 1 Pressure Buildup
GC-2B: "E" Sand Production Tess Nh. 2
GC-2B: "A" Sand Production Test No, 1
GC-2B: "A" Sand Production Test No, 2
GC-2B: "A" Sand Production Test No, 2 Pressure Buildup
Injection Profile Survey - Cretaceous "E" Sand - GC-2A
Core Anlaysis - GC-2B
Down-H61e Diagram- GC-2A
Down-Hole Diagram - GC-2B "E" Sand Production Test
Down-Hole Diagram - GC-2B "A" Sand Production Test
Down-Hole Diagram- GC-2B "A" Sand Injection Test
Down-Hole Diagram- GC-2B Final Completion
ATTACHMENT 1
~BP WELLS GC2-A AND GC2-B
TEST~PROGRAM
''DIARY'OF~EVENTS
1'. November 29, 1975
2f November 30, 1975
3. December 2, 1975
December· 2, 1975
· ..
5. December 3, 1975
6, Decembmr 3~ 1975
7. December 3, 1975
8. December 4, 1975
9. December 4-5, 1975
10. December 5, 1975
Perforated GC2-A "E" sand through tubing with 4
shots per foot over interval 516~'q~-,)5257' BKB.
: Perforated GC2-B "E" sand through casing with 4
shots per foot over interval 5166;9~,~256' BKB.
· With Reda pump intake at 2015' BKB, tested
GC2-B "E" sand from 0135 - 0645 hours at 3670
BPD. Shut down for PBU.
: Injected into GC2-A "E" sand from 2119 - 2300
hours at 3500 BPD. Fifty minutes into test,
developed communication with GC2-B. Shut down
injection. Produced GC2-B for 2± hours to fill
tanks. Pulled Reda out of hole and shut in GC2-B
at surface with blind rams.
: In~ected into GC2-A "E" sand from 0646 - i137
hours at 3bOO BFO. Three hours into test,
Hewlett-Packard failed.
: Reran Reda pump in GC2-B and produced "E" sand
from 1720 - 2330 hours at approximately 10,500
BPD.
~
: Injected into GC2-A "E" sand from 1907- 2330
~ours at 10,300 BPD. ~
: Performed step rate injectivity test on GC2-A
"E" sand from 0436 - 0558 hours at rates o~ ca.
5,000, 10,000, 15,000, 20,000 and 23,500 BPD.
Determined fracture gradient of ca. 0.67 psi/ft.
: Pulled Reda pump from GC2-B, ran in and set BP
at 3800' BKB. Perforated "A" sand interval
3586' - 3646' BKB with 4 shots per foot. Reran
Reda pump as before.
: Produced~GC2-B "A" sand from 0927 - 1800 hours
·
~at 3400 BPD. Pump cratered. Pulled same.
~rO d, "h '"
11o December 5, 1975
: Injected into GC2-A "E" sand from 1058 - 2102
hours at 3477 ~PD. When Reda pump in GC2-B
failed, mixed salt brine to maintain injection
until 2102 hours. Shut down for pressure fall-off.
12. December 6-7, 1925
: With a new Reda pump, produced GC2-B "A" sand
from 1535 - 1000 hours at 3400-BPD. - -
?rod,
13. December 6-7, 1975
: Injected into GC2-A 'JE" sand from 1845 - 0630
hours at 3526 B~. Shut down for pressure fall off.
14. December 7, 1975
15. December 7-8, 1975
: Injected into GC2-A "E" sand from 1921 - 2330
hours at rates of 3975 and 6915 BPD. Ran
Schlumberger full bore sp~nner/temperature survey
at both rates. Profile good. Shut down injection.
: Produced GC2-B "A" sand from 2050 - 0400 hours
at ca. 3500 BPD to fill tanks for "A" sand
injection test.
16. December 8, 1975
: Pulled Reda pump from GC2-B. and rigged up for
reinjection into "A" sand. Injected into GC2-B
~"A~' sand from 1155 - 1430 hours at ca. 7600 BPD.
Shut down for pressure fall-off.
Testing completed.
A.TTACHMENT 2
CONFIDENTIAL.
INJECTION DATA SU~RY
· .
CRETACEOUS "El' SAND (PERFOP~TED INTERVAL 5167' - 5257' BKB)
BP WELL GC2-A
Average Final Surface
Injection Injection ' '
Date Time Rate Pressure Interpretation
12-02-75 -2119-2300 3500 450 -
·
·
. .
·
L2-03-75 0646-1137 35~0 . 850 -
12-03-75 1907-2330 10,300 1170
0436-0500 5030 300 Analysis of surface and down-
..
0500-0515 9950 900 hole pressure data indicates
0515-0530 14,840 1650 fracture gradient is 0.67
0530-0545 19,750 1880 psi/ft.
0545-0558 23,500 2380
1058-2102 3480 930 Effective permeability = 93 md
SKiN = +15.7
Pressure drop SKIN = 737 psi
-Actual injectivity index =
.
3.2 BPD/psi
.
Injectivity index with zero
.
SKIN = 9.8 BPD/psi
· .
.2-06-07/75 1845-0630 3525 1260 Effective 'permeability =
100 md
SKIN = +17.1
Pressure drop SKIN = 756 psi
Actual injectivity index =
3.25 BPD/psi
· Injectivity index with zero
· SKIN = 10.7 BPD/psi
L2-07-75 1921-2103 3975 1030 Ran Schlumberger full bore
2103-2333 6915 1150 survey. At 3975 BPD profile
" uniform over' top 70'. At
~915 BPD profile unifomn over
'- entire interval. '
NOTE: "E" sand formation water used for injection during tests from December 2
· through December 4. "A" sand formation water used for injection thereafter.
,.
12-04-75
· .
12-05-75
ATTACHN~NT 5
GC-2A: "E" SAND INJECTION TEST NO. 1
~DEcEMBER 2, 1975
'PERFORATIONS: 5167' - 5257' BKB
Inj eeti0n 1 Surface Down-Hole ........
Time Rate Pressure Pressure*
BPD psig psia .., Remarks
2119 0 0 2346.6 Started injection.
2125 3253 1000 3295.6
2135 3549 325 2615.1
2145 3158 400 2751.6
· 2155 3513 390 2739.7
. .
2200 332i } 400 2~58.~ 'at 22uW aeve±oped communication
with GC-2B.
, ,,- , , =,: .... _ _ _ _
2215 3.553 400 2792.3
2230 2933 450 _ 2777.1
22_45 __ 3526 _ 450 2793.5 Shut_,down injection.
*Hewlett Packard gauge at 5275' BKB.
Water for injection from "E" Sand GC-2B.
Total water injected during this period = 233 barrels.
ATTACHMENT 6
GC-2A: "E" SAND INJECTION TEST NO. 2
DECEMBER 3, 1975
PERFORATIONS: 5167' - 5257' BKB
Injection Surface Down-Hole
Time Rate Pressure Pressure*
_ _ _. BPD u ._ psig psia Remarks
0646 0 0 2320.0 Started injection.
0650 2661 0 2433.3
~655 " 35204 -- 0 ~-2437'.2 ' - - ' ........
0700 3549 , __ 10. O 2458.0 .... . ....
0705 3435 175 2519 .'4
0710 3449 250 2576.5
071~5'' - 3321 ..... 280 2630.4 .... . .... .. -
'0720 3421 320 2667.6
0725 3492 340 2703.4
,-0730 .... 3492 " 366 t 2695.3
-0800 3520 360 .112'~06 0 ,' ..... .,. - ' .,
O81.5 3525 360 I 2711.5
08.30 3492 390 ~ 2749.4
0845 3435_ I 420 ' 2792,2
0900 3378 500 I 2877.1
0915 3544 550 I 2940.7
0930 3378 620 ' 2983'. 7 ..............
0945 3567 630 3013.4 At 0952 Hewlett Pa'ckard'"gauge
failed.
lOOO- 34~7" - 640 ............
1015 3549 680
1030 ~ 3525 720
1045 3572 760
1100 3681 800
1115 3470 810
. .
1130 3501 , 830
1137 .3630 850 Shut down'" tnj ecti0~", .... -
*Mewlett Packard gauge at 5275' BKB.
Water for injection from "E" Sand GC-2B,
Total water injected in 4 hours 51 minutes = 707 barrels.
T :
':GC~2A:
ATTACHMENT 7
"E" SAND INJECTION ~TEST NO.~ 3
· !DECEMBER '_3~ 'I975
· '_P. ERF0.RATIONS ;~. _51_6_?~-_.'.5 2 5
Time Rate Pressure
BPD psig Remarks
.... ..-_ '_19.07 .... 0 .... 0 . Started injection. _
·
1915 8,242 .725 .... _
1930 10,400 1000
__ - - _ ~ .... -_ _ , ,,
2ooo lO,4OO looo
· ..
2o15 lO, 4oo _~000_
,- 2030 _ 10,326 ..... 1050 --. __ . ~-- ....
_ · 2045--. 1~,167 '_. 1080 .....
... 2~00 10,11.7 __ 1100
...... '21k.5 ,9,865 ~ 19,80 ......
· ''._"2130 ..... 10,234- " I060 '..:. _ _ _-; " ' _ '' _ ....
..'.2..1.4.5. 10,242 ~ _1080 .................
2200 1.0,486 ...... 1_110 ........ __
' ' -- ' I
2215 10,586 1130
. 2230 .. . 10,553 . . 1150 ....
~ ~2245 lp,?02 1150 .........
-~. 230.0. 10, 4.52. _ :-_~. 1150 .... ...
2330 lOj 649 ,!170 Shut down.., inj ec~tio~. . ....
Water for injection from "E" Sand GC-2B.
Total of 1880 bbls. of water injected in 4 hours 23 minutes.
ATTACHMENT 8
GC-2A: "E" SAND INJECTION TEST NO. 4
STEP RATE INJECTIVITY TEST
.DECE~MBER 4~, 1975
PERFORATIONS: 5167' - 5257' BKB
~ Inj ec-t-~n ~ur-fa~c e D~)wn- Hofe~
Time Rate Pressure Pressure*~
........ B~D- ..... ps_~g _ psig ....
0_436 .... -. P -- 0. ...... 2279 _ :_ St_arted_ injeqt~i°D-_
044p_., 3,033 ...... _ _ 0 ..........................
._04_4,~, ,, _~.033 _ ..0,
0450 4983 100
0455 5083 250 .~.
- , -
· ~050_0 .... 5.033 _. 3oo _, 26,45
O5O0 I
~_0570-5 :~_ 9p.1,]5:"_-_7 8_50,_ ]'- - ,,
9__510_ 10,0_6,6 ...... 90-0
1515 98.65 900 ~3059 ..........
- - !
0515
0__520 14,999 1500 ..
0525 14,546 '- 1600
· ~53.0 14,974 1650 3470
O53O
0540 19,576 1830
_ ,----~ ..... ~- , , ,,,,
o_ 5_45 ~0,1_sZ . 1880 , 33~ ~ ....
O545
o55o 2,~,7'2,6 ~ -- '2~16_0~ .... i', ..............
0555 23,549 .... .2360
-O5~58 ~ 24,151 ~238~ 3588 Shut down injection.
*Amerada pressure bomb at 5275' BKB.
Water for injection from "E" Sand GC-2B.
'Total of 761 bbls. of water injected.
ATTACHMENT 9
GC-2A: "E" SAND INJECTION TEST NO. 5
DECEMBER 5~ 1975
Injection Surface Down-Hole
! Time Rate Pressure Pressure*
_ _~ BPD~ .... psig p~s_ia _ Remarks
1058 0 2333 0 Started in'ection
- _ _ ..-_ ..... · _ _~, .......... --_ ._ _ -- _ _ _~_ _~ ii ~ _ t e_
1100 3620 0 2381.5
~, _ · ......... : _ - ....... ~-~ ....... ~ , _ :. _ .... ~ ..... _ - _
3_1_0_5=_~ 34_0~7_ I 0 2~1.0
1115 3620 0 2443.0
1130 3586 __ _ 0:___ 2463'6
1145 3582 0 2480.6
1215 3468 I 0 2501.0
?-'1230- ] 3463 ] 0 2510.0 --- -- .........
1~00 i __33~4 ~ 50 ] .... 2537.5
13~-5 '--354g -- . 8-~ - t ~65 2 ..........
~3)P .:., )~34__=___-= ~0. __ 2610;0 _ . ._
1400 3520 180 2642.9
-. ~ _ : ~-. _
1415 3336 20ff 2680.0
ts00 3227 390 J, 286~.7 1
_.~30_. 3378 .... · _689. J_,3tSP~-s
1545 3591 740 I. 3210.0
-- _ ~ _=, .,
1600 3392 840 'J 3291.4
1630 3350 j 9)~ j-3~47.2 , "',, ' ............
1700 _.._3 5~ 2____ [ 1050 _ 34~. 3_
ly)o 3522 I. ~050 3546.9. _ _ .....
-,
1800 ~ 3556 ~ _ 1059 .... 3622.8 ............ .
~830 3556 I 900 3445.4
1900 '- -~656 1 860 34.35.8
19~0 ,.= ~ ~3fi~,6 ._ ]_ "~0 ~- -_ :3~7~-. 0
~000 _ 33 s) .. 880. 3422.2. .........
20)0 3353 ,,_ 9)0 .... ~392-9
2~00 3359 930 34~.6
.
-[[2~lp!~ --' . 930 .... 3412.6 J Shut do~ i~ectiop~.
* Hewlett Packard gauge at 5275' BKB.
Water for injection from "A" Sand GC-2B
Total of 1458 bbls. of water injected in 10 hoUrs 3 minutes.
GC-2A:
ATTACHMENT 10
"E" SAND INJECTION TEST NO. 5
PRESSURE FALL-OFF
~ DECEMBER 5/6~ 1975
Time
2101
Down-Hole
Pressure*
psia
3412.6
2102 3009.7
2103 2690.5
2104 2554.4
2105 2499.8
2106 2471.9
2107 2454.5
2108
2109
2444.4
2438.4
2110 2434.8
2111 2432.1
2112 2430.1
2113 2429.1
2114 2427.8
2!15 2~26.8.
2116 2426.0
2117 2425.4
2118 2424.5
2119 242.3.7
2120
2423.1
2130 ! 2416.7
2140 2410.9 ·
Time
Down-Hole
Pressure*
psia
2150
2200
2210
2220
2230
2240
2250
2300
2330
2400
0030
0100
0130
0200 2357
2404.4
2397.2
2392.9
2389.4
2386.4
2383.2
2380.7
2378.6
2372.7
2368.4
2364.7
2362.0
2359.8
.6
9239 2356.Q
0399~~ 2354.9
0400 2353.1
0500 2351.4
0600 2350.2
0700 2348.7
0800 2347.8
0840 2347.1_ _
* l{ewlett Packard gauge at 5275' BKB
ATTACHMENT 11
~GC-2A: "E" SAND INJECTION TEST NO. 6
DECEMBER 6/7, 1975
PERFORATIONS: 5167' - 5257' BKB
..... Inj ec'tion Surfa~ce D~-- ~oie
Time Rate Pressure Pressure*
_ _ . B~D _ _ p_sig , P~Sia Re_marks
1845 0 0 2329.2 .... ..s.t__a_rted inj_ection._? ..........
1900 340 7 850 3~366__._5 _ ~-- ...... _
~1~9i~5-. .... 34~,6,8 ...... 90_0~ .... ._ 3__375_. 4_
1930 3752 920 3398.2
1945_ _ 3284 _~ 9,,3.0 .... 3.3_91~. 6~ ................ _ _
2000 3350 950 3371.4
_2p~15 ~ 34_07 970 3379.6 -
2030 3435 990 3405.3 '
g. O45_ _ ~20 .......... 99_0_ .... _3.~4_38.~6
2100 3520 990 ] 3408.5
~'~_~-._" -~.~'~ -'- __ ~'l!oo_o. 17>~i~._~ '_ -. 2 i'~ ---
2130 3525 1000 3348.4
-~-S ~ 3~_~7~~- -~ ~n~-~ '-i'-3-~79.'~_
~_2oo.i~ ' 134,-f~ i ~ j~_ ~olo-o__-_..' ~' 7~'~z.i"_-_ _~' -_ -'
2215 3610 _ , _..!ooD .... 33~76.8 .... -_~- ............
22..3,0 3558 · 1000 ___ ~3~391;3
_.
2245. 3515 1020 3361.0
2300 3530 1020 3368.5
__.23-30~__ 3530. I _-1020 _3-38,3'~1 - ---
2345 3525 1050 3391.0
-~-24_0.0 - 3525 - 1i00 3398.4
.~0030~_ - 3~7,~. - xt~_o_~ ~--~_4-x~.i~-' .i'[ .... . ....
0.100 I 356____0 1060 3395.6
0200 3497 __ 1120 3384.2 _
0300 3513 1160 3399.1
-b~33b'' '357'2. - "f196 ..... ~5§'3.0 " ' ...........
q_O.~0p_, -3~03 1'2~0~ ~ 3-3-7-4.0 ~ .......... ' .........
043p 3596 · .. ~z_~o _ _ p_4.0S__2
0500 356o 1220 33~0.5
--0-~30- '- 3598 ....... 1~_46Lj3-~'28.0"' . _" ~_ .....
~-O[6.~30- -_ 356..0 1260 I 340.7..2 ...S~hut down injection.
* Mewlett Packard gauge at 5275' BKB
Water for injection from "A" Sand GC-2B.
Total of 1726 bbls. of water injected in 11 hours 45 minutes,
GC-2A:
ATTACHMENT 12
"E" SAND INJECTION TEST NO. 6
PRESSURE FALL-OFF
DECEMBER 7, 1~,5
PERFORATIONS:
5167' - 5257' BKB
Time
0630
Down-Hole
Pressure*
psia
3407.2
0631 2990.2
0632 2737.4
0633 2595.3
0634 2524.0
0635 2486.9
0636 2465.7
0637 2452.5
0638 2443.3
0639 2436.3
0640 2431.2
n6~n 2607.~
0700 2396.4
0710 2388.8
0720 2383.4
0730 2378.9
0740 2375.7
0750 2373.0
0800 2370.6
0810 2368.1
0820 2366.4
·
0830 2365.0
, 0840 2362.9
O85O
0900
O93O
1000
2361.7
2360.5
2357.5
_._
1030 2352
2355.0
.5
1100 2350.8
1130
1200
1230
1300
1330
2349.5
2347.8
2346.8
2345.8
2344.4
* Hewlett Packard gauge at 5275' BKB.
ATTACHMENT 13
__
GC-2A: "E" SAND INJECTION TEST NO. 7
INJECTION RATE AND PRESSURE DATA WHILE RUNNING SCHLUMBERGER
F~.LLBORE SPINNER SURVEY
DEqEMBER 7, 1975
PERFORATIONS: 5167' - 5257' BKB
..... ,i" in~'%-c t-i~n Surface
Time~ Rate Pressure
BPD' .. psig ....... i Remark~
.
·
1931 0 0 Started injection.
1935 2926 950
1940 4027 970
.... 1945 4052 -- 970 Started first profile survey
~ run.
20~0 3968 , ,970
2015 3892 1000
2030 3943 '1000
2045 4010 1010
· , ......
.-2~00 .... 40~7' - i030 .... At 21~3 changed rates.
2115 6375 - 1100
2130 6979 1110 Started second profile survey
_ ...... run. _
2145 6988 1120
2200 6996, L---- ~ 1130
2215 6904 t 1130 ............ . .....
_2230 ~ _ .~912 .... 1130 .
2245 6853 1140
- -soo ,,
~3'3~ ....... 6853 l.. 1130 . .Shu~ ~own injeition.
Water for injection from "A" Sand GC-2B.
Total of 720 bbls. of water injected in 4 hours.
'.ATTACHMENT 23,
' BP WELL GC-2A
m
'DOWN-HOLE
DIAGRAM
.CRETACEOUS "E" SAND INJECTION TEST
AND FINAL COMPLETION
,,..:ONFI DENTIAL
KBE = 72:.81' AMSL
L
20" AT I00'
"~" CIRCULATION STRING TO 2025'
9 5/8" TO 2050' ""
I$ $/8" AT 2186'
7" FROM 2050'-.5662'
·
4 I/2" TUBING TO 4998'
PACKER AT 4966'
·
"£" SAND PERFORATIONS 5167'-5:>57'
P. BTD 5570'
7" AT 5662'
"-rD 5665'
ALL DEPTHS BKB
bP ALASKA INC.
31 ! 1 - C - STREET · TELEPHONE (907) 279-0644
Mr. O. K. Gilbreth
Director
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Dear Sir:
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
CONFID i TIAL
March 5, 1976
8 - 1976
, ,-C': ;;. :. ,. :.. ..... : .....
Attached are the production and injection data from the tests of th~
Upper Cretaceous "A" and "E" sands in BP Wells GC-2A and GC-2B.[·
Included with this information are our interpretations of the data
as well as the core analysis of all the intervals cored in GC-2B.
You may recall 'that much of these data were presented to you on
January 12, 1976 in the discussions regarding future disposal of
Sadlerochit waste water.
Should you have any questions regarding the attached information,
please do not hesitate to contact us.
Very truly yours,
BP ALASKA INC.
AEL:vjp
Manager Operations
Attachments
cc: File DEV-PB-284/9
BP ALASKA INC.
311 1 - C - STREET · TELEPHONE (907) 279-0644
MAILING ADDRESS:
P.O, BOX 4-1379
ANCHORAGE, ALASKA 99509
February 18, 1976
CONFIDENTIAL
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. 0. K, Gilbreth,
Director
Gentlemen:
BP Water Disposal Wells GC~2A and GC~2B
_ - _ _ -_ -- .... ~ . -. -. -~, ..... ~..~ .~ ~ ~. ~. ~ ..~, .
Enclosed please find, in triplicate, Form 10~403, Sundry Notices
and Reports on Wells, for the above named wells,
Very truly yours,
BP ALASKA INC ~
Attachments
cc: Drilling Well File GC-2A, #17
P. E. Well File GC-2A
Drilling Well File GC-2B, #17
P. E. Well File GC-2B
G. Dr Taylor
Manager Operations
Form- 1'0-403
REV. 1-10~73
Submit "Intentions" in Triplicate
& "Subsequent Reports" In Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
WELL WELL OTHER WAT~ D~SPOSA~ ~
2. NAME OF OPERATOR
BP A! ~_ .I~.
3. ADDRESS OF OPERATOR
P, O. Box 4-1379, Anchorage, A!l~k-_
99509
4. LOCATION OF WELL
At surface
1768' ~rI,, 1702' SNL, Sec. 16, TllN, R13E, OPM.
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
KBE 72.8' aasl
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20167
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28284
7. IF INDIAN, ALLO~I'EE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
l~t River
9. WELL NO.
10, FIELD AND POOL. OR WILDCAT ,
Prudhoe Bay Field
SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 16, TllN, R13E, OPtl
12. PERMIT NO.
75-41
)ort, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF L----J PULL OR ALTER CASING
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT OR ACIDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other) INJECT SAn~I~O~IT EASTE ~ATER
sUBsEG~UENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other) ....
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of
starting any proposed work.
As stated tn the Honthly Report submitted to you on January 12, 1976, BP Well ~C-2A
was comp~etedwith the interval 5167 - 5257 ft. BXB perforated in the Cretaceous 'E'
Sand. This well wiLt ba used for disposal of waste .saline water produced in the
initial years of oil production from the Prudhoe Bay Oil Pool.
Note: A total of 7525 bbls. of water was in~ected into the 'E' sand in BP Well ~C-2A
during the testtn~ and co~pletion~ operations.
'" NFID[NTIAL
STATE OF ALASKA COPY
16. i hereby certify that ~t~d correct
TITLE ~aager Operations DATE.
SIGNED · ~e D~
for State. ~ ~ . ~
(This space office u~)
APPROVED BY~ TIT LE DATE
CONDiTiONS ~ APPROVAL, IF ANY,
~pr~ed Copy
~ Instructions On Reveme Side ~ ' d
BP ALASKa iNC.
3111 - C - STREET · TELEPHONE (907) 279-0644
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
January 12, 1976
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. O. K. Gilbreth,
Director
Gentlemen:
BP Well Number GC-2A
Due to an oversight, the Monthly Report of Drilling and Workover
Operations, Form P-4, for BP water disposal well GC-2A was not
submitted, and is accordingly herewith attached.,
Very truly yours,
BP ALASKA INC,
vjp
Attachments
cc: Drilling File GC-2A, #17
P.E. Well File GC-2A
G. . aylo
Manager Operations
bP ALASKA iNC.
3111 - C - STREET · TELEPHONE {907) 279-0644
Mr. O. K. Gilbreth
Director
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
January 12, 197~
It is anticipated that relatively little water will be produced with the hydrocarbons
from the Sadlerochit reservoir during the initial years of production from the Prudhoe
Bay Field. BP Alaska intends to dispose of any such saline water by injecting into
the Upper Cretaceous "A" and "E" sands. These sands are defined by those occurring
in the intervals from 3587' to 3654' and from 5110' to 5338' (DIL depth BKB)
respectively in BP disposal well GC-2B, The overall concept and plans for disposal
of Sadlerochit waste water into Tertiary/Cretaceous water-bearing sands were outlined
in BP Alaska Document GE 315, entitled "Sadlerochit Waste Water Disposal Wells GC-2A
and GC-2B", presented to you on August 12, 1975. At that time, BP outlined plans
for extensive coring and testing to be performed in the aforementioned wells in order
to evaluate the injectivity characteristics of the "A" and "E" sands. GC-2A and
GC-2B have now been drilled and tested and the pertinent data obtained are attached.
The test program used on GC-2A and GC-2B consisted primarily of producing from the
"E" and "A" sands individually in GC-2B and injecting into the "E" sand in GC-2A
during several injection periods. After completion of the "E" sand injection tests
in GC-2A, one mud tank volume (820 bbls.) was injected into the "A" sand in GC-2B.
The injection tests in both sands were followed by pressure fall-offs which were used
for calculation of permeabilities and skin effect (see Attachments A and B). Also,
a step rate injectivity test on the "E" sand was useful in establishing its fracture
gradient of 0,67 psi/ft, Due to the limited amount of water available and the high
permeability of the "A" sand, it was not possible to determine its fracture gradient.
During the production of the "E" and "A" sands in GC-2B, representative formation
water samples were obtained and analyzed as shown in Attachment C. In summary, the
total dissolved solids content of~ the "A" sand water is 11,119 and of the "E" sand
water is 36,808 parts per million.
The major conclusion from the injectivity tests is that the effective permeability of
the "E" sand is much less than we had originally estimated. Also, even though the
"A" sand is thinner than the "E" sand, its permeability thickness product is
approximately three times as great. We feel, therefore, that the "A" sand is a much
better candidate for disposal of waste water and would certainly be adequate to
handle the anticipated volumes of waste water during the first two to three years of
production. After that time, however, it may be necessary to have additional
intervals available for disposal. The "E" sand would probably provide sufficient
additional injection capacity,
Mr. O. K. Gilbreth
State of Alaska
-2-
January 12, 1975
With the foregoing in mind, BP Alaska Inc. proposes the following plan for disposal
of Sadlerochit waste water:
1. The "A" sand at BP Gathering Centers 1 and 3 will be the primary disposal
interval,
2. Ail water disposal wells will be drilled to the base of the "E" sand, Future
wells will be completed as "A" sand disposal wells.
3, The "E" sand at BP Gathering Center 2 will be the primary disposal interval.
However, if an appropriate stimulation treatment of the "E" sand cannot be found,
GC-2A will be recompleted as an "A" sand disposal well,
When produced water volumes become excessive for "A" sand disposal, the "E" sand
will also be opened for disposal,
BP Alaska Inc, therefore requests approval for the aforementioned plan of action.
We believe that this disposal of water into the "A" and "E" sands will not
contaminate any fresh water sources or endanger any other natural resources. Since
we are currently drilling the water disposal wells at Gathering Center 1, your
expeditious handling of this request will be greatly appreciated, Shouldyou require
any additional information to act upon this proposal, do not hesitate to call on us.
Very truly yours,
BP ALASKA INC.
BED: vj p
G, D. Taylor
Manager Operations
Attachments
ATTACHMENT
INJECTION DATA SUMMARY
BP 'WELL GC2-A
Date
12-02-75
12-03-75
12-03-75
12-04-75
12-05-75
12-06-07/75
12-07-75
Time
2119-2300
0646-1137
1907-2330
0436-0500
0500-0515
0515-0530
0530-0545
0545-0558
1058-2102
1845-0630
1921-2103
2103-2333
Average
Injection
Rate
BPD
3500
3500
10,300
5030
9950
14,840
19,750
23,500
3480
3525
Final Surface
Injection
Pressure
450
850
1170
3OO
9OO
1650
1880
2380
930
1260
1030
1150
Interpretation
Analysis of surface and down-
hole pressure data indicates
fracture gradient is 0.67
psi/ft.
Effective permeability = 93 md
SKIN = +15.7
pressure drop SKIN = 737 psi
Actual injectivity index =
3.2 BPD/psi
Injectivity index with zero
SKIN = 9.8 BPD/psi
3975
6915
Effective permeability =
100 md
SKIN = +17.1
Pressure drop SKIN = 756 psi
Actual injectivity ~ndex =
3.25 BPD/psi
Injectivity index with zero
SKIN = '10.7 BPD/psi
Ran Schlumberger full bore
survey. At 3975 BPD profile
uniform over top 70'. At
6915 BPD profile uniform over
entire interval.
NOTE: "E" sand formation water used for injection during tests from December 2
through December 4. "A" sand formation water used for injection thereafter.
A T T'A'C'H M E'. N~,'7'/.' B
' 'I. NJECT!ON 'DATA 'SUMMARY
..
'BP '~LL 'GC2~B
Date
Injection
Time Rate
BPD
12-08-75
1155-1430
7620
Final Surface
Injection
Pressure
PSIG
8O
Interpretation
Effective perm. = 570 md
SKIN = -5.9
Pressure drop skin = -205 psi
Actual injectivity index =
141 BPD/psi
Injectivity index with zero
SKIN = 29.4 BPD/psi
NOTE: "A" sand formation water used for injection during this test.
ATT~ C
Water Analyses of .,A" and ,E" Sand Water
BP Well GC-2B~
"A" SAND
Sodium, ptm~
Potassium, ppm
Calcium, p~m
Magnesium,
Barium,' ppm
Iron, p~m
2,993
898
436
155
6
0.1
10,537
2,898
671
682
5
0.6
Sulfate, p~m
Chloride, p~m
Carbonate,
Bicarbonate, ppm
3
6,530
0
211
1
21,'800
0
445
Total Dissolved Solids, p~
11,119
36,808
Specific Gravity @ 60° F.
Observed pH
Specific Resistance @,68° F.,
ohm-meters
1.0061
7.9
0.58
1.0263
7.3
0.19
Sulfate R~ducing Bacteria Negative Negative
~)rm Ho. P--4
~q~%T. 3' 1--70
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUBMIT I~ DUPLICAT~
MONTHLY RE!PORT OF DRILLING
AND WORKOVER OPERATIONS
WKLL __ WELL
WATER DISPOSAL WELL
~. NAME OF OP~ATOR
BP Alaska Inc.
3. A]~DRE$S OF OP]~TOI~
P. 0. Box 4-1379, Anchorage~ Alaska
4. LOCA'nO~ Or WF, LL
99509
1768' EWL, 1702' SNL, Sec. 16, TllN, R13E, UPM
CONFIDENTIAL
N'U~ERI CA.~ CODE
50-029-20167
LE~kSE DESIGNA~ON AND $ERRIAL NO.
ADL 28284
IF INDIA]~, ALOT iEE O~ TRIBE NAME
L,~IT FA.R{vl OR LEASE N.adglE
Put River
GC-2A
10. FIlleD ~ND POOL. OR WILDCAT
Prudhoe Bay Field
ll S~.,T.,R.,M..(BO~OMHO~
om,mc'rrv~
Sec. 16, TllN, R13E, UPM
12. PIgILMIT NO.
75-41
13. REPORT TOTAL DEPTH AT END OF MONTIt, CHA~NGF-,S IN HOLE SIZE, CASING AND C~_,NiENTING JOBS INCLUDING DEPTH
SET ~ VOLIYlVIES USED. pEP,.FOHATIONS. TESTS ANT) RESULTS FISHING JO]~S JUNK LN HOLE AND SIDE-TI~ACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
November, .!.97.5
November 29
Perforated interval 5167' - 5257' BKB through tubing.
December,_1975
December 2 - 3
Injected into same interval @ 3500 BPD for periods of 1½ and five
hours. Injected for 4½ hours at 10,300 BPD while producing from
GC2-B at ca. same rate.
December 4
Injected into interval 5167' - 5257' BKB @ rates of 5000, 10,000,
15,000, 20,000 and 23,500 BPD for 15 minutes at each rate to
determine fracture gradient.
December 5
Injected into same interval @ 3500 BPD for ten hours. Water for
injection being supplied from interval 3586' - 3646' BKB in Well
BP GC2-B.
December 6- 7
Injected into same interval at 3500 BPD for 12 hours. Shut down
for pressure fall-off. Restarted injection at 4000 BPD and maintained
for 1½ hours while running Schlumberger full-bore spinner survey.
Changed rate to 6900 BPD and ran survey again. Shut down injection
after 2½ hours at this latter rate.
December 10
DisPlaced tubing with 40 barrels - 50 - 50 methanol water mix.
14. I hereby certify correct
S~GN~D ~'_ h ' T=,,1,,4-,.- 'n'n~ Manager Operations ~.~
NOTE--Report on this (ormlts recluired for .each calendar month~ regardless of tho status of operations, and must ~ flied In depilate wlt/I the
oil and gas ~onservat~on ¢ommit~ee bythe 15th o~ the suoceeding month, u~les~ otherwise girected.
bP ALASKA INC.
3111 - C - STREET · TELEPHONE {907) 279-0644
CONFIDENTIAL
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
November 26, 1975
Attention: Mr. O. K. Gilbreth
Director
Gentlemen:
Well Number GC-2A (16-11-13)
Enclosed, in duplicate, is Form P-7, the Completion Report on the
above well, together with Well Logs, Well History, and Gyroscopic
Survey.
Very truly yours,
BP ALASKA INC.
G. D. Taylor
Manager Operations
cmc
Enclosures
cc: Well File #17
Ms. Cindy Petty
: , ·: I::''. SUBMIT IN DUPLICATE*
t ~. '~ 'i STATE OF ALASKA , ~Seeother h,-
..... ~ i OIL~ AND' S CONSERVATION COMMITTEE · ~e,'~,'~ ~Ue~
, ,
.
WE'L~;COMPLE~I~N--~.~coMPLETION REPORT AND LOG *
- ' WE~L ~ D~v ~ Other Water Disposal
b. TYP~ OF CO~PLE~ON:
WgLL OV ~R ~ N ~AC~ ggSV R. Othe~
2, ~AME OF OPERATOR
. ,BP A_~aska .Inc.
~. ADDRESS OF OPERATOR
P. O. Box 4-1379
LOCATION OF WELL (S¢~0r[ location clearly and in accordance witA any ,~tate requirements)'
At surface
1768' EWL, 1702' SNL, Sec. 16, TllN, R13E, UPM
At top prod, interval reported below
CONFIDENTIAL
5.APl NUMEECAL CODE
50-029-201_67_
6. LFASE DE~IGN^.'I~ON AND SERLA.L NO.
ADL 28284
7. 1F INDIA. N, AI.,IX)'i-r~:~: OR TRIBE NA.M.E
8. UNIT,F,~I~iVI OR L~_.,AS~. NAME
GC-2A
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay Field
11. SEC,, T., R,, M., (~TTOM HOLE
OBJECTIVE)
Sec. 16, TllN, R13E, UPM
At total depth of 5570'
1780' EWL, 1749' SNL, Sec. 16, TllN, R13E, UPI{ l~..Pm~Z~o.
75-41
10-4-75 [ 10-20-75' . ] 11-1-75 [; KBE ;';'$ ' 72.8' AbISL J BFE 43.6' AMsL
18. TOTAL DEl'TH, iVLD & TVD[19. PLUG BTEC-~ MD & 'r'VD[20. L~ 1VfUL'i- :I~LE COM, PL., [ ~i. ' -INTERVALS '~RtLLED BY
! DEPTPI [ HOW iVLA. NY* I ROTARY TOOLS } CABLE
5665' ] 5570" I None ] Rotary L
~-. PRODUCING LNT~VAL(S), OF THIS COMPLETION--TOP, ~3OT~OM, NAME (MD. AND 'rv~), {PS. 'WA~ DIRECTIONAL
[ SURVEY MADE
tense, j Yes
24. ~'-PE ELECTt-tlC AND OTHER lOGS RUN
UTl./gP 2185' _-' 5656' 4-arm cnlioer/GR 210~.' - 5663'. CBI~/.VI)L/GR
CASID¢G 1RECOFLD (Report all strings set in well)
CASING SIZE WEIGHT, LB/FT. DEPTH SET (M_D) HOLE siZE CEA~TLNO RECORD
2.050' - 5570'
I A_MOUNT PULLED
LINER I~ECOP~D .
SIZ]D '[ TOP (MD) I BOTTOM (MD)
-- 7"i~:..! t2050' I 56_~9'
~. PE~O~TIONS OPEN TO PRODU
}SACI~S Cm~m~W-i
. (interval, size and number)
30. PRODUCTION
27. TUBING R.~OO TLD
4-zi2, l .,4998'[ [
29. AC~, SHOT, F~'U~, C~NT SQUEEZE. ~C.
DFAYI'I{ I!NTlgRVAL (MD) [ AMOUNt /dX'D KIND O.F MATE~tklAL USED
, ] .
DATE FIRST PIXODUC~ION ; [ PRODUCTION ME'IHOD /Flowmg, gas lift, pumping--size and type of pu~p)
!
DaT~ OF TruST, HOUHS T'~ '[~OXE SIZE [PROD'N FOR OI~B~L.
FLOW WBING CA~G P~S~ [CA~~ OI~BBL. GAmMa.
31. ~sPoa~oN or ~s (8otd, ~,ed ~or I~el, ~ented, etc.)
32.LISTOF ATTACHMENTS
I WELL STATUS (Producing or
shut-in)
GA~.$--B[CF. WATEH,---BBL. [ GAS-OIL Fi~TIO
I I
]WAT]gt~--BBL. IOIL GRAVITY-A-PI (COLOR.)
tTEST WITNESSED BY
33. ~y ~~t'th6'[~ol~ 'atti~ ~fo~afibn Is complgte and correct as determined '~rom all available records
~ ~ :: ' . ~ *(See Instructions and S~ces for Additional Data on Reverse Side)
,.
INSTRUCTIONS .
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.. . ...' ....
Item: 16: Indic-ate which elevation is used as referenc~ (w.~ere not otherwise shown) for dept~ measure-
ments given in cther spaces on this form and. in any attachments.. ....
Items 20, and 22:: If this well is completed .for separate production from more than one intbrval zon.9
(multiple completion), so state in item 20, and in ite~.~! 22 show the prc. Jucing interval,.
'top(s), bottom(s) and name (s) (if any) for;~nl.y':the int~:'val reported in item 30~.~Su6'mit a sep$1~'ate ~ep0'r~f
(page) on this form, adequately...identifiec[;; for'each additional interval t.o be s~per~tely prodUCed, s'ho~::
lng the adlditional data pertinent to such.4nter.~al r .... '?
Item26: "Sacks Cement": Attaci~'~d sUppl&ment~l records for this well should show the details of any mul-
;..:~" tiple stage cementing and the location-of'::the~..~ ~ ,.Cementi~J tool ..... ~.,;':
'~- Item 28: Submit a separate com_.,pletion re~Ft,on this (°rm for eachL interval 'to be separately produced.
.,. (See instruction for items 20 and 22 abov. e) .... .,; - . ::
',,'; -' . ~ :.. ~ ....
" '.:; · -, C · ..;¢ .;
......... ,'f'"i , , , ~',, ,,,,,
..... 34. 'SUMMARY O~" li'Ol~[/~'I'lON T~,S']'S ~NdLUDING INTI~RVAI.,'"~'TEI~. PR, F, SSUI~]~ D'ATA AND '~OV]~q.I~,,S' Or OIL. ~A~' ' ..................... '~? ....
''-- 35.
."; WA~ AND MU~: :' '; ~-~
_ _ ~ .......... , ..... , , - ..,.~ , ........ ~",~,~ ..... . ....
· .~ ., .~.~ F-?..~. . .,
~ '.~. . ·
. ,
r~, ..
.-: , .. --- .~.
.
, .
3~. ,CORE DATA.' AT~ACl[ BR1E~ D~CRIPI~ONS OF LITHOLOGY. POROSITY. FRAC~R~. APP~NT DI~ : ..
..~ AND DE'CECq'EI) SIIOWS OF OIL. G~ OR WA~. ~
~..
.
. .
, ] ·
.
.
,
.
...
..~
.
~ m ~
Well History
GC-2A (16-11-13)
Water Disposal Well
CONFIDENTIAL
October.~ 1975'
3- 17
Accepted the Rig 2400 hours, October 3, 1975.~ Spud at 1330 hours, October
4, 1975. Drilled to 547'. Stuck pipe, recovered same. Modified flow
lines. Drilled to 2586'. Ran 58 joints 13-3/8" 72# N-'80 Buttress casing-,
stuck at 2186'. Cemented shoe with 3000 sacks Arcticset cement, did three
top jobs using 4150 sacks. Arcticset cement. Installed McEvoy casing head
adaptor sliplock, Gray 12" casing head.
18 - 31
Tested casing. Drilled hard cement to 2253'. Ran leak off test, drilled
cement stringers to 2585'. Drilled to 5665'. Ran Schlumberger logs. Ran
92 joints, 7" 29# N-80 Buttress casing'liner with shoe at 5662' and top at
2050'.. Cemented in two stages with 833 sacks cement. Tested lap; broke
down. squeezed lap with 100 sack§ Permafrost C cement. Drilled cement to
5580'. Ran CBL/VDL/GR and gyro, pressured casing, reran logs. Ran 52 joints
9-5~8" 47# N-80 Buttress tieback 2050' to surfa~ce. Tested; seated seal
mandrel in PBR; retested. Displaced 13-3/8'' x 9-5/8" annulus to Arcticpack.
Ran 50 joint.s 7" 29# X-line circulating string with bottom at 2025'. Ran
166 joints 4-1/2" 12.75# J-55 Hydril A-95 tubing with PBR at 4996', packer,
~tail joint, Otis N-nipple, and shear out sub. Packer failed to seat, sheared
out PBR. Removed PBR, fished packer.
November, 1975
Removed Packer. Reran 4-1/2" assembly with top of PBR at 4966'. Landed
tubing hanger, nippled up and tested t~ee, set packer. Pressure tested
tubing and annulus. Ran Schlumberger 2-7/8" dummy gun. Displaced 4-1/2" x
7" and 7" x 9-5/8" annuli to glycol/water mixture. The 4-1/2" tubing has
,
50-50 Methamol - water to 1300' .and 9# brine 1300' to TD. Rig was released
2400 hours, November 7, 1975.~ ~
f.
DIRECTIONAL SURVEY REPORT
FOR
B P....ALASKA.._ INC ....
FF~-'r!AL
STATE OF ALASKA COPY
TYPE OF SURVEY: ·.Gyroscopic _
SURVEY DEPTH: FROM
_ FT. TO ~70 ,,,FT.
I.E~SE.' ,, Put River
-WELL NO. GC-2A _
FIELD: Prudhoe Bay Field
COUNTY/PARISH North Slope Borough .
October 25, 197~
DATE OF ~tJRVEY.
OFFICE: Anchorage, Alaska
.. STATF Alaska
lOB NO. SU3-1:..6. O28 .....
--
'-).
SPERRY-SL~;~ WELL SURVEYi~:iG COMPANY .PAGE i
A'~iCF~O R A SE'~"-"~ E~ $ KA ...................
F~.po~ ~-~L:.:S~"A~ I,'~C, . '
6C-2f: Co~YPUTATION DATE
..
"'""' CONFIDENTM[ ' '
.. E~'~c,~.~..:::-~T;~:~ .:r?:', RITY RE T ~GULA~ COOROI~.ATESN- VERTICAL
~:L /E~ iCA~ I :CL ':AT '~: DI,,EC iON SEVE C A
ucG ~.,iN ..............~EG~E~S': ............GEG'/100 ........ ~.~ORTH/SOUTH ............ EAST/NEST ............. SECTION
, .
I
,S7
,'9?
t
.
I
· ~
.-~
"~T
DATE OF SURVEY OCTOBER 25, 1975
SURWEL GYRoSCoPIC igULTISHOT SURVEY
'"TJO ~"-N UN 8 ER '"S U3;~'6' 02 8' ....... ~ .................................
KELLY E, USHING ELEV, : 72.81 PT.
.
E 0.1% 2.82 N ' 0.73 E -2.55
W 0.33 2.~7 N 0.71E -2.70
E .................... :0"I3: ............. :"'.?:-"5,~8::',N ............. ~ ................ O,'7'O-:"E ...............-$.'10
E 0.20 5.76 ~ 0,97 E =~,~0
_ g9 ~ 1,45 E -3.50
~ OeO9 ~.19 N 5,8~ E
~ .......... O,u8 2.7~ N 4-,56 E '-'!,-
£ O.O9 2,32 i~ 5.2~ E -0. ..)
E 0,13 1.79 N 5,91 E -0,27
~_ ............ 0.'~ ............ "0,95 N ................. 6.65 ~ 0.72
S ~.~6 0.~ S 7.~ E ~.07
E O,~5 !.2~ $ 7.99 E 5.20
W ............O,C6 ............ 2.69 $ ................ 8,15 E ........... 4.62
E ~,23 ~,87 S 8,3G. E 6,77
:'.-' '~.~5 6,97 S ~.2G E 8.80
;..: O,l~ ......... ~.OL ~ .................. 7,81 5 ........ 10.75
t.. 0..1.7 iJ,5~ S 7,~5 ~ 12.65
t~ 0,~9 lS.2~ S 7,3~ E 1~.65
~= C.0o~' -- !4.7~ b'- '7,36-~._ ..... 1'.o 1~
:,: S,i'& !S.2q. S 7.55 E 17,53
~.; r' , J. 7... ~7 .55 S 7.15 E 18.7~:-
_ .
-72.ai 0 O N O, 0 E O,O~ 0"00 ' ': ..... 0.00 O, ~
................... 27.i8 ............. ~-'I': .......... ~ .............. N-'"'B2j75'--K ................. l'¥'gO 0;'75-'-~ ................O-';"~7'"E~ ............................. "0'~.
127.17 0 19 H ~. 7 E O,G9 1,6& N 1,1~ E --1,~
227.i7 0'1~ iq 22.60 W 0.32 2.08 N 1.2~ ~ ,-1.71
...... ~27.~7 ...................... ~ ....... I-0 ...... ? .... N<'~. .... 7:"5: .................... U'j22 .... ~--~2~q'2"-~ ...... ~ ......~:;22~5 .....................'2.0~
i)27.i7 O 1~ ~-'- 9. 2 ~ 0,i~ . 2.7~ ~ ? 1.27 E -2.3~
527.17 .0, ~5 H.~2.!~ ~ -:!.,/0.2~ ...<~ 3.0~ ~ .... :.,' 1'.0' ~ -2.~9
_._
i/ '.::.;.,'-SpERRy-SU!:; WELL SURVEYING
GC-2a CO~PUTATION DATE
ALAS~.~A
'
T~WE SU~-SEA
VS~TiC~L VERTICAL
~T~ ............ DEPTH~
--, : ,
: .
CO~}P'ANY , .PAGE 2
[}:ATE 0,~ SURVEY OCTOBER 25, !975
SURWEL GYROSCOPIC ~ULTISHOT SURVEY
. :.:. ': 7JG~T-NU'; ,BEE
KELLY BUSHING ELEV, =' 72;81 FT.
..... . .
:.COURSE.. COURSE DOG-LEG
iNCLINAT!GN DIREC'fION SEVERITY
TOTAL
RECTangULAR COORDINATES
VERTICAL
:SECTION
.~1 O ~5 S ~0,~q W
qO 0-- ~ S 15, 8 '~ '
=O O l~ S::~3,37 W
.90 C 23 $ 7~.62 "~
.90 ~ ..... 25":'~;-~S-~'8''''~'~--~,-, ,~ ............... ~,
.89 0 32 S 77,82 :,'::~ 0,17
,8~ O 15 $ 5~,9~ W
.
.
!
0,07 18.93 S 6,80 E 20,
· ~.~8- 2~i~2""-~ ~-3'8-E ........ 2I',,.
C,~O 22,01 S 5,92 E 22.7~
0.18 25.11S 5.56 £ 23,77
U;25'~ ......... -2'3,'8~$ ...... ---5~8'-E
0.22 ' 2g.62
25.03 S ' ~,~2 E 25.10
25,~8 8 2,85 E 25,20
87
82
O 25 N ,32.5J E 0.09 25.57 S ~.95 E 25.56
0 21 S 5~.29 E 0.~O 25.58 S ~,~8 E 25.89
0 ....... ~ ......... S ~%'38-'-E ........... 0¥38 ............. 2'~;36 .... S- ----~ 54-02~E 2&,78
O ~S S 5~,75 E 0.07 27.~7 S 5,77 E 28.0~
0 ~5 S ~6,89 E 0.07 28,57 S 6,5§ E 29.~0
0 5~ S 2.!3 g 0,~6 ~0,71 S 7,27
1 ~0 S l,SO W 0.~2 ~2.68 S 7.26
79 ......... 1 ....... 2~ ......... S ....... 8:,~'2- E ........ O-;~l ........ 35',05 S 7';36 'E ................. 35,79
76 1 15 S lq, 1E .o,25 37.33 S 7,77 E ~8.09
7~ I 9 S lq,l~ E 0,10 3~.36 S 8,28 E ~0,18
71 ...... I ...... 2W .......S'-'17', ,
65 1 22 S 33.7~ E 0,20 ~5.97 S 11.12 E ~7.29
65 ............ :--I ....... 20 ......... S"3~'~-6-7--~ UjIS ............ ~7;30'S I2;'-IO'-E ............~8.52
= ~+'3.52 FEET ~T $CUTH, lq 3E6. 21 .,"lit',!, EAST AT i'~!O = 5570
~R-,- BASEJi2 of:_ T!-;E '~-Z,.. ,_. O7. "'kl;::EE: . d. I?:".ENS tO;.;AL. ;:A~'~iUS- <IF CUP\/~!TL;RE,
WELL SURVEYIF, iG COMPANY
.
PAGE
DATE r~F SURVEY OCTOSER 25, 1.975
SUR'~iEL GYPO$COP[C P!ULTISHOT SURVEY
KELLY BUSHING ELEV, - 72.81 FT.
-RE'EE~-BuSHIf~G-'EEEV. = 72 ;'
-I.~Tc. RPuL.~:TEB'-:.V~'LUES-FgR'-EVE.F,F'"'IO'O'CY-'-FEET"OF-'M/ASURED- D~PTH
I ~, :. ,': ...,. '."' ~.., '"
'r~-b ~: SU~-SEA TOTAl,
DEPT;-~ ¢EPTH i]EPTH NORTH/SOUTH EAST/WEST
_ rr~ ~;~_ CORRECTIO~
-0
0.02
0,66 .. ....
o';-2's
0,2.9 0',05
0,~ - ' 0,10
T,4r_-C ~,uL~. O!,,i PROCEO!jRE,S ARE BASED o~',' THE USE OF THREE O:i:~ENSIODTAL RADIUS OF CURVATURE FiETHOD.
-
WELL
XNTERPOLAT£D
SURVEYING COMPANY
VALUES
PAGE
,
.
DATE OF SURVEY OCTOBER 2.5, ~75
SURWEL ~YROSCOF-IC MULTISHOT SURVEY
' - .... ~J-O'~F~,J~B~ER-'SFJ;5;';
....... ~., , 72,8Z ,
KELLY uU~HXNG-ELEV. -' FT
. : . .
. ~ ... ....
........... - _:¢_ .... ..,.'":.' . .' '2'.
FEET OF SU~-SEA ~EPTH
.. rOTA'E
RSCTAMGULAA COCRDINATES
NC~r¢ 'H/S~UT~ EAST/WEST
~'qO' TVO VERTICAL "~
O IFFEREi'L;CE CORRECTICN ,~
O,OO 0,00
0,~1 E 0,00 O,O0
1.28 E 0,01 ~.00
1.17 C 0,01 '" O.O'O
I. 2 ~ ~ 0', 01 '~0'.'"0'~ ........................ -
1.~5 E 0.0i
0,81 E 0,02 -- 0.00
0.67 E 0.02 G,O0
-EPT;~ ~].~PT'H DEPTH
'? 0.00 -72.~i 0.00
.
~'~ 72. ..
· ~r~_ z:.'~,.:~. 200,00 1.~6 , ~',:
3~ 372.~0 ~OO.O0 2,~5
~,~ 772o~ ................... 7UO'oOO ............................. 2"'B5""~'
.
-'.'~'v2, -~ :.-..- ..... - 'touu, ...... O0 ..................... 3',-66.--,~; '0', 85'"'.
I~2. :~-] llO0.O0 ~.97 ~, 1.3~
2~2,6''',~ 12nuT,06 ~.0% N_ 1,97
. ~' l~uO,O0 ~,33 "
572.8? 1500.00 2.8~ ~; . . ~.36
~72.61 ........ i500.00 ........... ~;~% ;-:-'-- ........... 5;07
O;'O2 0~-0'0
0,02 O,OO
0,02 0,00
0'0~" 0,00
0,05 0,00
0.0~ 0.00
0;0~
0o0~
B.P. ,e~L.~,ShA, !?':C.
GC-2A
ALAS~:.A
mLL SURVC'YiNG CO.~4~ANY
C~,.,r~ .uTATION OATE
..
....
· -PAGE 5.
--.
DAT~ OF SURVEY. OCTOBER 25, 1575
SUR~EL ~YRO$COP~C ~ULTISHOT SURVEY
:
~L Y BUSHZN$ ~LEV. =: 78.81 FT,
u .:. P T F-; u ::. F T ~
INTERPOLATED VALUES FOR EVE% 100 FEE.T OF SUB-SEA DEPTH
rOTAE: .. -
¢=.~TZCAL RECTANGULAR OOOROINAT£S ;qD-TVO VERTIOAL
~EPTH NORTH/SOUTH EAST/~,~EST DIFFE E,~uE CORRECTION
1 ~-~'~'~ 1'872.31 1P30.
................ 2F7'-~ ............. ~.o'~9. _ · .~a'~'~ ...............
:21~'- ~ _21~2.~1, 210o.
....................~,_.= .............. ~ =,~e~~'~.S~.. .... .... ~r~ ~. ....
. - ' ~l 270a
~7~S 2.~ ~ 2. ......
.............~:=:"m~ .... 3~7A,--~- ~'* .... 3~u~.
O0 1.2g ,,.; 6.~5 E 0.05 O.OO
O0 0.12 ;,.i 7.20 E 0.06 0,00
O0 2.10 S- 8.16 E 0,08 ~,00
O0 q.27 S 8.21E 0:,10
O0 6;~5-S '8;38 = 0".I2 0'*'C2
O0 8.~8 S 7,95 E 0.15 0,02
O0 10%71 S - 7.51 E 0.17 - - 0,02
OO -12'j'8~ S .... ?;'"5'~'-E-
OO i%,~5 S 7.35 E 0.21 O,O'i
_ 5& ~ 0,22 O,Ol
O0 15.88 S 7.
O0 i?,'20 'S .......... :Ti'25"E .....................0;'25 ........................ 0,00
O0 18.55 $ 6.90
OU 20.05 S 6,50 E 0,25 0,01
O'O ............. Z1'.68-"'S '6'~0~ E ................ 6'~2'7 O~OI
O0 22.65 S B.65 E 0.27 0.00
aO 23.75 S -- 5.~0 E 0,2~ 0.60
O0 2~,25 .... S 5'j27 ~ 8'".28 O',O0
O0 2~.5~ S ~,~3 E 0.~6 0,00
..)
...... .-L ......................
STATE OFA AS:<A
ALABamA
8PERRY-SU-N WELL SURVEYING
- -- ' ...... r.,
COMPUTATION 'DATE
.
'!
PACE~ 6
DATE O'F SURVEY OCTOBER 25~ 1975
SURWEL'CyROScoFIc MULTISHOT SURVa
:: :.KELLY. B'USHIN6 ELEV. =,'72'.8~ FI.
: ....
.
INiERPOLAT£D VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
-- .............. -~ ..... ;7 .......... :' ....... TRUE ........................ SUBJ..SEA
"TOTAL
ME~SUR, E~:; %'E~q TICAL VEATICAL R=CTA~ LaR
DEPTH g~-_
.......
COORDINATES MD-T\tD
EAST/WEST OIFFERENCE
3,6& F_.
~2-a''
2 ~q' E
;5.76 E
%173 ~I~2.51 ~IOO.O0 25.~0
~=~--~ ~ %~72,~... 4~00,00 26,08
~.v3 ~672.3! ~GOO.OO 29,29
~7'7b ~772.41 4700.00 50.29
0.26
0,29
0.29
0,30'
0..30
0,31
7.01 E
7.25 E 0,34
'VERTICAL
cORRECTION
O,OO
0,00
0 ;"0 O:
':":. ~-...0' 00
--0';'
'0, O0
0.00
rj;'O a
O,O0
0,00
5 C' '"'3 ~': n--,,~ 61 5000
................. 5'?-.' .'T'5 ........ :i72. ~J- .......... ~190
-~" "' ?" ~ 5200
55 'v ,','u -=. = ('_, 9., ._ .
.... THE '" ...... ~
~:'-~. ;E;.:. :'sT
';'O'O '~2,05 'S ........ --7"'28'-'-E .....
,00 5~,~0 S 7.29 E
.00 ~6,76 S 7,65 E
.OT .................. ~8-'~"-$ ~';'IS-"E
.00 ~0,87 S 8,69 E
.O0 ~3,21 S ..- ---
0,58 O,Oa
0.%1 0,.03
0,%6 0,0~'
9.52 E 8.~9 0.05
5~00.'00 ............... ~5",'~ S .... ' .... I0';77'E *'--'=~.~ .............0,0~
549&.&3 ~7.~0 S 12.10 E 0.55 0,02
PROCEi}dRES---USE-~ L'I{'IEA~ i~?TERPOLAT~ON' BET~EE~'.r ....
FOOT MO (FROM RAOIUS CF cUrVATURE) POINTS
...................................... CO Dr.N AL'- ....................................................................................... : ........... . .......
STATE OF ALASKA COPy
L_
BP ALASKA INC.
3111 - C - STREET · TELEPHONE (907) 279-0644
CONFIDENTIAL
CONFIDENTIAL
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
November 10, 1975
FILE:
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 PorcUpine DriVe
Anchorage, Alaska 99504
Attention: Mr. O. K. Gilbreth
Director
Gentlemen:
Well Number GC2-A (16-11-13)
Enclosed herewith please find in duplicate Form P-4, Monthly
Report of Drilling and Workover Operations for the above
described well.
Very truly yours,
BP ALASKA INC.
Manager Operations
cmc
cc: Well File
ANCHO.R.AOE
~c)rm No. P.-4
~V. 5- I-?0
STATE' OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
o~ ~ G,S ~ o~.~. X Water Dis')osal Well
WI~LL WJ~LL
NAME OF OPerATOR
SUBMIT IN DUPLICATE
BP A]aska Inc.
~iADDRMSSOFOP~RATOH
P. O. Box 4-1379, Anchorage, Alaska 99509
LOCATION OF WFJ-,L
At Surface:
1768' EWL, 1702' SNL, Sec. 16, TllN, R13E, UPM
AP1 NU54ERlCAL CODE
50-029-20167
6 !,~ASE DESIGNATION AND SERIAL NO.
ADL 28284
IF INDIA}$', ALO'i' lEE OR TRIBE NAME
8. L,~IT FARM OR LEASE NAME
Put River
9 WF!.T, NO
ge2-A (16-11-13)
10 FIELD AND POOL. OH WILDCAT
Prudhoe Bay Field
I1 SEC, T., R., M. (BOTTOM HOLE
OB0~CTrVE)
Sec. 16, TllN, R13E, UPM
1~. PEP. MIT NO
75-41
'113. REPORT TOTAL DEPTH AT END OF MONTH. CHANGES IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLLrlVIES USED. PEI:~OHATIONS. TESTS AND HESULTS FISHING JOB~ JUNK IN HOLE AND SIDE-T1R, ACKED HOLE
A~TD ANY OTI-IER SIGNIFICANT CHANI3ES IN HOLE CONDITIONS
October, 1975
Rig accepted 2400 hours, October 3, 1975. Spud at 1330 hours, October 4, 1975.
Drilled to 547', stuck pipe, recovered same. Modified flow lines. Drilled to
2586'. Ran 58 its., 13-3/8" 72# N-80 Buttress casing, stuck at 2186'. Cemented
shoe with 3000 sacks Arcticset cement, did 3 top jobs using 4150 sks. Arcticset
cement. Installed McEvoy casing head adaptor sliplock, Gray 12" casing head,
tested casing. Drilled hard cement to 2253', ran leak-off test, drilled cement
stringers to 2585'. Drilled to 5665'. Ran Schlumberger logs. Ran 92 its., 7"
29# N-80 Buttress casing liner with shoe at 5662' and top at 2050'. Cemented in
2 stages with 833 sacks cement. Tested lap; broke down. Squeezed lap with 100
sacks Permafrost C cement. Drilled cement to 5580'. Ran CBL/VDL/GR and gyro,
pressured casing, re-ran logs. Ran 52 joints 9-5/8" 47# NL80 Buttress tieback
2050' to surface. Tested; seated seal mandrel in PBR; re-tested. Displaced
13-3/8" x 9-5/8" annulus to Arctic Pack. Ran 50 joints, 7" 29# X-line circulating
string with bottom at 2025'. ~ Ran~I66 .joints 4-1/2" 12.75# J-55 Hydril A-95
tubing with PBR at 4996', packer, tail joint, Otis Nipple, and shear out sub.
Packer failed to seat, sheared out PBR. Pulled tubing. Trip to retrieve packer.
DIVISION OF OIL AND
Ab~CHORAG~
s~ ~ ~--, -~ Manager Operations
NOTE--Report on this fo~ is required for ea~ calendar ~th% regardleSS of the ltotus of operotio~ and must ~ flied in duplicate with the
oil and gas conservatbn commiflee bythe 15~ of the SuQ~Nding mn~, ~ie~ Otherwise directed.
BP ALASKA INC'
3111 - C - STREET · TELEPHONE {907) 279-0644
CONFIDENTIAL
CONFi NTIAL
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
November 10, 1975
Ir,
t.~ C~OLI
CONFER:
FILE:
i .:.l
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. O. K. Gilbreth
Director
Gentlemen:
Well Number GC2-A (16-11-13)
Enclosed herewith please find in duplicate Form P-4, Monthly
Report of Drilling and Workover Operations for the above
described well.
Very truly yours,
BP ALASKA INC.
Manager Operations
cmc
cc: Well File
~'. ~- 1-70
STATE OF AJ.,ASKA
OIL AND GAS CONSERVATION COMMI'~EE
SUBMIT IN DUPLICATE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
O,L. ~ G*e ~ OT~ X Water Disposal Well
w~LL WZLL
NAME OF OPERATOR
BP Alaska Inc.
3. AbDRESSOFOPERATOR
P. 0. Box 4-1379, Anchorage, Alaska
99509
4. LOCATION OF W~T-T~
At Surface:
1768' EWL, 1702' SNL, Sec. 16, TllN, R13E, UPM
CONFIDENTIAl
AP! NI3~ERICAL ~ODE '
50-029-20167
DESIGNATION AND SERIAL NO.
ADL 28284
IF INDIA]~, ALOI iL~. O]~ TRIBE NAME
8. L,~IT FARM OR LEASE NA3~E
Put River
9 W~!,!, NO
GC2-A (16-11-13)
lO Fl~i.D ~ND POOL, OR WII.DCAT
Prudhoe Bay Field
sEC, T., R., M, (BO~I'OM HOI~E
OBJE~rVE)
Sec. 16, TllN, R13E, UPM
il. PEP~IIT NO
75-41
13. REPORT TOTAL DEPTH AT END OF MONTH, CHA. NG~ IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUIVrES USED. PEHFOlq_ATIONS. TESTS A.N'D H~ESULTS FISHING JOBS JUNK ~ HOLE AND SIDE-Tlq~CKED HOLE
~D A~Y OTHER SIGNIFICANT ~G~ ~ HOLI~ CONDITIONS
November, 1975
Removed packer. Re-ran 4-1/2" assembly with top of PBR at 4966'. Landed
tubing hanger, nippled up and tested tree, set Packer. Pressure tested tubing
and annulus. Ran Schlumberger 2-7/8" dummy gun. Displaced 4-1/2" x 7" and
7" x 9-5/8" annuli to glycol/water mixture. Released rig 2400 hours, November
1, 1975. Well suspended pending completion of Well GC-2B, at which time GC-2A
will be perforated for testing.
DIV!$1ON C,I= OIL AND
SIGNED TITLE DAT~
(~"i I). 'l'a.V I fiT' .
' NOTE--Report on this for& is required for .each calendar month~ regardless of the status of operationS, and ~ust ~ flied In dupli~te with the
oil and gas conservation commiffee by the 15~ of the suoc~ding ~fl~, ~le~ Otherwiso directed.
Form i o-40 -~
RE~. 1-10-73
~' Submit "intentions" In Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT-;-" for such proposals.)
O~L r-! GAS E]
WELLI--.J WELL OTHER X Water Disposal Well
NAME OF OPERATOR
BP Alaska Inc.
ADDRESS OF OPERATOR
P. O. Box 4-1379, Anchorage, Alaska 99509
4. LOCATION OF WELL
At surface
1768' EWL, 1702' S~IL,. Sec. 16, TllN,.R13E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
Est. KB 65'
14.
Check Appropriate Box To Indicate Nature of Notice, Re
C0Nt:I NTIAL
·
5. APl NUMERICAL CODE
50-029-20167
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28284
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Put River
9. WELL NO.
GC-2A
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay Field
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 16, TllN, R13E, UPM
12. PERMIT NO.
75-41
3ort, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF L.~ PULL OR ALTER CASING
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT OR ACIDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other) ~hange surface location
SUBSEQUENT REPORT OF:
WATER SHUT-OFF [~ REPAIRING WELL
FRACTURE TREATMENT~ ALTERING CASING
SHOOTING OR ACIDIZlNG ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of
starting any proposed work.
This is to inform you that the surface location of WatEr Disposal Well GC-2A
is'changed from 1673' EWL, 1734' SNL, Sec. 16, TllN, R13E, UPM to 1768' EWL,
1702' SNL, Sec. 16, TllN, R13E, UPM.
16. I hereby certify that the foregoing is true and correct
_ G.D. Taylor .~ I ~,
(This spac; for State of;~ ;~.) ".~ (>1 ·
APPROVED BY , /~'" ' , :..~, ~~l~
CONDITIONS OF ~PPROVAL, IF ~Y~ - -
TITLE
See Instructions On Reverse Side
Manager Operations
TITLE
I
' '
,8 ' ;7 LAT. TO°18'36 51"~ C,~ ' ~ I
I // , i M v X = 640,973 i ~ I ~ I
,~ I ~o I ~, I I
t'~' -. * - f ........ ~: ~-- q-~ .... A .....
i ', , ,
I I I
, I
SCALE.' I"= I MILE
CERTIFICATE OF SURVEYOR
I hereby certify that I am properly registered and
licensed to practice land surveying 'in the Stdteof Alaska and
that this plat represents a location survey made by me or
under my supervision, and that all dimensions and other
details are correct.
Date
SURVEYOR
NOTE:
8/8/75 REVISED WELL LOCATION;
10/29/75 REVISED WELL NAME F~oM I~'TO;~. ? i!/ i.!; ~ C.J.R.
· '"...
",~',; ?-i .;- ' ~,'~
PROPOSED
6. C. No. 2__
WATER REINJECTION WELL-A
Located in
NW I/4 PROTRACTED SEC. UMIAT MERIDIAN
Surveyed for
B. R ALASKA INC.
Surveyed by
FM. LINDSEY 8[ ASSOC.
LAND I~ HYDROGRAPHIC SURVEYORS
2502 West Northern Lights Boulevard Box 4-081
Anchorage Alaska
02~00tB (REV. 08°73)
M EM:O-RANDUM
~~~¥~ gAVeL RESOU~S
~v~slon~ of 0ti ~d ~a~
TO:
State of Alaska
DATE:
FILE NO:
October 21, 1975
TELEPHONE NO:
SUBJECT:
BOP Stack Test, BP GC-gA
BOP Stack Test, ARCO NGI-2
~~ my home at 7:40 AH October 16, 1975 to catch 9:00 AH BP charter
for P~ Ba~. a~vt~ at Deadhorse at 10:.30 AH. I was met at the atr-
~..s~!.p by Mr. NO11 'NOo~, ap:repres,,en~t.t.~e..and, w~. p. ro.c~ to N.a.b?~s__ .. be
;~Jlilng Rig 18-E ~ we lea:~ nl_pp11~g ~ .naa 3.asr ~e_ga..n.~.na ~_~ Wa?la
"::-:~~al hairs bm'ore tests would, begln. ~. ~:an. ~ose, ur~ng foreman, was
'::::asleep and 1~. ~ recemmmied a sho~ tour of the fteld before checktng me
!:- :, ;~tnto a room at BP operations. Temperature ~as +12*F ~th ltght snow.
'-Oa checkJm] into BP operatJen~::., we 't~ediately attemped to contact
':~ Tom ~e~ster, ARCO Or~ll~g .Foreman, at RRCO's NGI-2 ~ocat~on but were
-?:'::unS~sfUl in do~ng so: (ge we~b~ .learn later that the phone to Challenger
:i:?-:Rig :No, 51 ~as e~perlenci~ pre .' ..... wh.fch were to plague us during the next
in--ti:tent reports threugho~ the day and eYe~ l~g Indicated many problems
-~:::.-){n nlpP!tng Up at the BP locat!on, l~ahors 18-E .: g ts on tt's ftrst iocatton
.:::.-)~1:.~ new creWs ami highly sophisticated equipment,
At:' 8:05 Al~ .~tober 17, 197S Mr. Tom ~lebster of ARCO called advising the BOP
:-:-s:':-~ck-~as nJppled up l~ut Chang~ in the choke manJfotd and the Inability to
~$n..t~ l~h s~ule t60 wetd ells were delaying tests. Mr. Nobster ..
~suggested he contact lee. Rose with BP to try to coordinate possible wtt-
-~-/~st. ng of both ARCO a~qd BP tests, ge agreed.
~e were ca]led to the BP locatton at 12:30 PM to begin tests. However, on
-a~jval ¶t was soon evtdeat .~at additional problems had to be overcome.
:~e toured the rig ami locat~ion wtth Mr. Rose and Mr. Bob Pomeroy, Nabors
"~'~-[Tooipusher. The reserve p¶t was diked and tn good condition. Fuel tanks
'were not diked. The wellsign had not been. f~n-ished yet. N~ bottles were
not wa- the floor at the accumulator site. PJpe rams, bltnd rams and hydrJl
_..~ actuated by ~ prtmr~ Con_trois. The pJ;pe, anddb~ind rams opened and.
'i:..:¢leSed ~n five seconds. The hydr11 opened aha close n 13 seconds.
- A~ps to pressure test the stack fa~led when the test plug would not seat
--.'in the casing head. Atteapts to correct this problem began.
'.At i2:30 ~t4 October 18, 1975 Mr. Elden Schultz, Toolpusher for Challenger
· Rig No. 51, arr~ved to take me to the ARCO ttG]:-2 location. :]:t had been
agreed that the ARCO gas injection well should take precedence over the BP
;water in3ectton we1.1 if ~ two r~gs tested equipment simultaneously.
~ arrived at the A~_O NGI-Z location at 1:05 AM to. ftnd Hr. Tom ~lebster had
:been relieved by Hr. ']ohn Gessett. Due to the change of personnel and phone
problems 'the stack and k111 line components had already been tested to 5000
:psjg wtthout my being on location. Another hitch developed in the choke
O. ~, Gtl~~, Jr.
B. ~n - F?etd Tr~p
B~ Stack T~ts - ~,
October 21, 1975
ma.nJfold and testlm3 was del~.
At 6:00 AH ~e ~mre advised a ~~ delay could be expected.. Re _~ured the
location which was neat amt~.~l'l orgeinzed. The reserve ptt tins diked but
the fuel ta.ks ~ ~ot. The well sign was correct ,and tn place, tl~ bottles
at the accumulator tested 2200, 2100 and 500 pstg. Five spare N2 bottles
~ere on hand a~d we rec~ the 500 pstg bottle be replaced.
Testing of the choke mantfold began at 10:30 AM and lasted until 3:10 PM.
Hlneteen va'lyes tncludlng t~m manual adjustable chokes and the S~aco auto-
mattc c~e ~mre tested s~sfully to. 5000 pslg as well as 66 ,flanges.
Testtng was delayed lntemittently due to four leaktng valves and the fatlure
of thee Spreuge ptaep to bl.eed off after preset.rig up. These probl.ems were,
c~~ as they occurred.
The kelly cock, lower kelly valve, and both ball and dart type floor valve
were test~ to 5000 pstg. Testtng ~as cempleted at 5:05 PM. A Ffeld
Ins~tton Report ~as prepared, the. origtnal gtven to Hr. Gossett with a
copy to-Hr. Rlchard. IL~owles and a copy attached to thts report.
At 6:05 PM we contacted Hr. Brlan-Rose at the BP GC-2A locatton to see tf
tests had been compleX. He advtsed all tests were completed by mid-after-
noon. The ~ bottles ~ould be. hooked to the acceaulator, the well s!gn
completed anO discharge 11nes fr~m the choke manlfold to flare ptt, reserve
pit and separator would be Installed before _drilling out, Mr.. Rose advtsed.
Re did not complete a Fteld Inspection Report on thts well due to the lack
of observat~s made.
I departed Oeadhorse airport at 10:55 AH October 19, 1975 vta 1~ten f11ght 10
and arrtved at Anchorage Intereatlonal atrport at 1:15 PM .vta Fairbanks,
In summary,, we witnessed partlai testlng of both BP's GC-2~ and ARCO's
flGI-2 BOP equlpment before drill*lng out from under' surface..
'~ "~ "? Ala~-~Oil and Gas Conservation CommitS)
,
'~ --m~ Field Inspection Re. port
Drlg~-Permit_No. ~,~':~'~ .~ ~J~Y~Y Well/Platfm Sec/~T~y_~LR.JiF~*', M
Operator /<~d,~J ~ . Represented by ~~-~ Name & Number
Satisfactory Type Inspection Satisfactory Type Inspection
Yes No Item (~,Location,General Yes No Item (.~BOPE Tests
(~)~ ( ) 1. Well Sign (~)~ ( ) 15.~'Casin,q set @~~'
(~ ( ) 2. General HoUsekeepin,q (~' ( ) 16 Teac fluid-( )wtr.---~--~ )mud (~J~oil
( ) ( ) .~. Reserve Pit-( )open( )filled (~)~ ( ) 17. Master Hyd. Control Sys.-2~:.~., psig
( ) ( ) 4. Rig (~)~ ( )' 18. N2 btls.j~_j~,.~/~,/~j~,j'~psig
( ) Safety Valve Tests (~)~ ( )
( ) ( ) 5. Surface-No. Wells (~)- ( )
( ) ( ) 6. Subsurface-No. Wells (~ ( )
( ) Well Test Data (~-~ ( )
( ) ( ) 7. Well Nos. , , , (~)~ ( )
( ) ·( ) 8. Hrs. obser , , , ~ ( )
( ) ( ) 9. BS&W· , , ,-- (~)-~ ( )
( ) ( ) 10. Gr. Bbls. (~ ( )
( ) Final Abandonment (~ ( ) 27. Blind Rams~.~,~,~psi.~
(·) ( )- 11. P&A Marker· (~ ( ) 28. Pipe Rams ~~ ~.~ si·q
( ) ( ) 12. Water well-( )capped( )plugged (~ ( ) 29. Kelly & Kelly-cock.~'r~,~ psig
( ) ( ) 13. Clean-up (l~)~ ( ) 30. Lower Kelly valve ~?~_psi?
( ) ( ) 14. Pad leveled (~ ( ) 31. Safety Floor valves-(~)~V
Total inspection observation time '~ hrs/~la~y~ Total number leaks and/or equip, failures
Remarks '~:~' ........... ~.~
..
19. Remote Controls
20.- Drilling spool- ,~ "outlets
21. Kill Li.ne-(~'~Check valve
22. Choke Flowline (~)~HCR valve
23. Choke Manifold No. valvs~_~_~flgs
24 Chokes-(~FRemote( )Pos.(~dj. '-
25 Test Plug-( )Wetlhd(')c's.q( )none
26. Annular Preventer,ji~,ampsi
cc- ~ ~'y .~'?~....~.~a~ ~''' ~:~?~-- Notify ........ in days· or when ready Inspected by ~ /']~,~,~.,.~/ Date
.
BP ALASKA INC.
31 1 1 - C - STREET · TELEPHONE {907} 279-0644
CONFIDENTIAL
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. O. K. Gilbreth,
Director
MAILIN(~ ADDRESS:
P.O. BOX 4-1379
ANCHORAC~E, ALASKA 99509
October 16, 1975
Gentlemen:
Well Number BP GC-2A (16-11-13)
Enclosed please find, in triplicate, Form 10-403, Sundry Notices and
Reports on Wells, for the above named well, to alter setting depth
of surface casing. This Sundry Notice is sent as a follow-up to
verbal approval from Mr. Hoyle Hamilton to Mr. P. R. Judd October 14,
1975.
Very truly yours,
BP ALASKA INC.
EFW: vj p
Enclosures
G. D. Taylor
Manager Operations
cc: Well File GC-2A #17
Form 10-403
REV. 1-10~73
Submit "1 ntentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT---" for such proposals.)
C O N F I D E N T'I'A L
5. APl NUMERICAL CODE
50-029-20167
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28284
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
1.
GAS
~LLUWELLU OT.ER Water Disposal Well
~ NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME
BP Alaska Inc. Put River
3. ADDRESS OF OPERATOR 9. WELL NO.
P. O. Box 4-1379, AnchOrage, Alaska 99509 GC-2A (16-11-13)
4. LOCATION OF WELL
At surface 1673~ EWL, 1734' SNL, Sec. 16, TllN, R13E, UPM.
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
Est. 65 ~ KBE
CheCk Appropriate Box To Indicate Nature of Notice, Re
14.
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay Field
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 16, TllN, R13E, UPM
12. PERMIT NO.
75-41
)orr, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF L----
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
PULL OR ALTER CASING L_~
MULTI PgE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF:
WATER SHUT-OFF E~ REPAIRING WELL
FRACTURE TREATMENTH ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details; and give pertinent dates, including estimated date of
starting any proposed work.
18½" hole drilled to 2586' 13{" 72# MN-80 Buttress run to 2186" BKB
Casing stuck and cemented at 2186'.
Planned T.D. of 9-7/8"'hole at 5665'.
16. I hereby certify that th~i~:true a~nd co:rect
SIGNED ....
~. u. "ay,pr
TITLE
Manager Operations DATE.
(This space for State office use)
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY:
TITLE
DATE
See Instructions On Reverse Side
Au~t 19, 1975
75~1
~. 6. g. Taylor
l~aeager Operat~eas
BP At~ska Ira:..
P. O. :~x 4-1379
~r S'~r:
Enclosed l..s the approved apple:cat{on for.permit to drfll the above referenced
well at a locatt~on tn Se~-t~on 16, Township 11N, RAnge 13£,
i~el1 ~les, ~ ch{ps, a ~-tog and direction survey are not required.
Many rivers in Alaska and ~tr. drainage systems have been classified as
tmpor~t for .time spawnteg or mtgrat:ion of anadromm~ fish. Operations tn
thee areas are. subject to AS 16.50.870 and the regulatlons promulgated there-
under (Title S, Alaska A~{n.istrat{ve lode):, Prtor to cm~enctng operations
you may be contacted' by ~ P~bttat Coordinator's oCftce, Department of F{sh
Pollutton of any water's of the State Is prohibited by.AS 46,_ _Chap_ret. 03,
Arttcle 7 a~ the regutatlons .premulgated tY~ereund?r (T{tl_e ].8,.A. las~.a "to1
A~tntStrat!ve C~, ~~r. ZO) and. by t~ Federal l{ater Po~ ~u:~on ~on~
Act, as ~. Prior ~ cmmenctng operations .you may be contacted by
a representattve of ~ Depar~t of [uv~~n~l Conservation.
Thts per~tt ~'s approved for ~..dr1111ng and testtng of thts well and approval
of rut1 scale dtsposat of prodded waters ts subject, to the revtew of the
test .data.
.....
Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska Department
of Labor is being not{f{ed of the tssuance of this permit to dr111.
Page 2
At, just 19, 1975
in ~e event of suspen-st~ or .abandonment please give thts offtce adequate
advance ~tiffcatton so that we-may have a wt~ss p~esent.
O. K. :Gilb~el;h. J~. ~'
Alaska 011 a~ G~s Conse~atton ~tt~
E~!osure
cc: Oeparta~nt of Fish and Ga~, Habitat Section w/o eric1.
Oepar~at of E~vt~tal Conservation w/o eric1.
Oepar~t of Labor, Supe~tsor, Labor Law Coeplia~e
Otvtst~ w/'o eric1.
BP ALASKA INC.
P.O. BOX 4-1379
3111 - C - STREET
ANCHORAGE. ALASKA 99503
TELEPHONE {907) 279-0644
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. O. K. Gilbreth
Director
Gentlemen:
Water Disposal Well GC-2A
Enclosed please, find the following documents:
1. Application for Permit to Drill Well GC-2A.
2. Proposed Drilling Program Outline.
3. Our check in the amount of $100.00 to cover the permit
filing fee.
4. Three copies of surveyor's plat showing well location.
Very truly yours,
BP ALASKA INC.
Manager Operations
Enclosures
cc: Well File #17
Perm I0-- 401
R]~. I-I--71
IlL ?YPB 0~' woRK
SUBMIT IN TRIP LTl:
(Other instructions .. ,
reverse side)
STATE O,F ALASKA
OIL AND GAS CONSERVATIO'N ,CO'MMITTEE
PERMIT TO DRILL OR DEEPEN
DRILL []
b. TYPE OJ' W~LL
DEEPEN []
Water
APl #50-029-20167
6. LF-.A$~- D~I~NATION'AND S~I~L NO.
ADL 28284
?.IF IN'DIAN, AI.,L~ OR TRIBE NA_M~
8. UNIT~FARM OR LEASE NAME
Put River,
9. WELL NO.
GC-2A
O,L
W~LL
W,LLO*" [--] o,.,~ X Disposal
2. NAME OF OPESRATOR Well
BP ALASKA INC.
ADDRESS O'F OPERATOR
P.O. Box 4-1379~ Anchorase~ Alaska 99509
LOCATION OF WELLAt surface
1673' EWL, 1734' SNL, Sec. 16, TllN, R13E, UPM
At proPOsed prod. zone
(SAME AS ABOVE)
13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE*
10.mi. N,W. of Deadhorse
14. BOND INFORMATION: State of Alaska
TYPE Blanket, Surety and/or No. Federal Insurance Co. 80391192
15. DISTANCE FROM PROPOSED* ]16. NO. OF ACRES IN LEASE
LOCATION TO NEAREST
PROPERTY OR LEASE LINE, FT ..... ,
(^isa to nearest drig, u.it, i~any.) J. 13~+ So. of 28281 ~' 2560
18. DISTANCE FROM PROPOSED LOCATION* . PROPOSED DEPTH
TO NEAREST WELL DRILLING, COMPLETED.
OR APPLIED FOR, FT. '
2050' ~:.-~- =-= at 6487' 6500'
21. EL~-~Fk~NS TS'h~'~'~w1~/~th~r DF, RT, CR, etc, ~
~o~ KB 67'
PROPOSED CASING AND CEMENTING PROGRAM
10. ]FIELD AND POOL, OR WILDCAT
Prudhoe Bay Field
., SEC., T., R,. ~., ~Bo~o~
HOLZ O~ECTIVE~
S16, TllN, R13E, UPM
12.
$100,000.00
[17. NO, ACRES ASSIGNED TO THiS WELL
NA
20. ROTARY OR CABLE TOOLS
Rotary
22, APPROX. DATE WORK WILL STAR'F*
September 15~ 1975
SIZE OF HOLE SIZE OF CASING, . WEIGHT PER FOOT GRAI~E SETTING DEPTH quantity of cement
17-1/2" [ 13-3/8" 72# N-80 2700' 3000 sks. Arcticset or Per~'
9-7/8" 7" 29# N-RD 6500' 1200 ft.3 Light Wt. Slurry
.,,
,
,
, , ,
,
. .
,
~rmafrost
Tertiary and Cretaceous Sands will possibly be cored and will be logged.
IN ABOVE SPACE DIESC"P, JBE i~ROPOSED PROGRAM: If proposal is to deepen 'give data on present ppoduc~ive zone a~d proposed
mew pro-duc-rive zone. _If_.p~o_~o_s~.l is t,.o drill or d~pen dtreetjonally, give pertm/~nt data' on's~/bsurface li~.~tion~ and measU~d ~d true
Vertical depths. Give blowout P{'ev-e_nter' prog~am. '"- -
24, Ihereby certify t~g~s 'rl%le~ anti Correct
DA~ Manager Operations
(This space for State office use)
t SAMPLES AND CORE CHIPS I~.E~U~
[] YES ]~ NO
DIREC'rIONAL SURVEY RE~
YES ]~ NO
CONDITIONS OF APPHOVAL, IF ANY:
JM,U,D LO'(;
[] Y~s ~NO
SEE TRANSMITTAL LETTER
A.P.I. ~CAJ~ CODI~
*~p~ov~u.^rr August 19, 1975
^Pm~OV~,V ~mz .......,, Chairman *See Inm~ctio., On Reverie Side
August 19, 1975
~ ~, , ~ ~ ,T. 12 N.
I [,~ I ~ IT'IIN.
I ~.~ L
~ . ~..~ ...... ~_<~_~_~ ........ ~ -~-,
~~ . ~ ~ I / ~ ~/,o k ,, I ,~L
,
' ~ ~ ~/ PROPOSED~ 15 / , ~ I '
__,~_
~G.C. 2WELL-A ,,~', ) ~ ~ I
-
~ I I I I
]_
/~ ~ ~ ' ~ ''~ '
I
SCALE: I": IMILE
CERTIFICATE OF SURVEYOR
I hereby certify that I om properly registered and
licensed to prectice lend surveying in the State of Aleske end
thet this pier represents e Iocetion survey mede by me or
under my supervision, end that ell dimensions end other
deteils (]re correct.
Date
SURVEYOR
NOTE:
8/8/75 REVISED WELL LOCATION. C.F.G.
PROPOSED
G.C. No. 2
WATER REINdECTION WELL-A
Located in
NW I/4 PROTRACTED SEC. 16~T. IIN.~R. 13E.~UMIAT MERIDIAN,AK.
Surveyed for
B. ~ ALASKA INC.
I
Surveyed by
F.M. LINDSEY 8~ ASSOC.
LAND & HYDROGRAPHIC SURVEYORS
2502 West Northern Lights Boulevord Box 4-081
Anchorage Alosko
W~LL GC-2A WATER DISPOSAl, ~'~iLL
PROPOSE~D DRILLING PROGP32,! OUTLINE
Dry bucket 26" hole to 80'+ below ground level and cement 20" conductor
to surface using Arcticset--or Permafrost cement.
-Drill 17-1/2" hole verticall~,~.o 2700'+KB and cement to surface using
Arc~icset or Permafros~ cemmnt. Instal--1 13~5/8" 5000# BOPE.
Drill 9-7/8~' hole vertically to 6500'+ and cen~ent 7" liner ~th over
100-ft. lap in 13-3/8" casing. --
Complete well for injection using 4-1/2" tubing and injection packer.
Non-freezing fluids to be left through Permafrost,
Bio,out preventer program consists of 5000 psi WoP. pipe rams, blind rams,
and bag preventer from the 13-3/8" casing point to T.D.
~MECK LIST FOR NEW WELL PERMITS Company
Yes No Remarks
1. Is the .Permit fee attached ...................... ~
Lease & Well No.
2. Is well to be located in a defined pool ................
3. ts a registered survey p!.-~s~.~_,~_~'~ached ..... ........... ~(
4. IS Well located proper distance from property line .......... ~c
5. Is well located proper distance from other wells ........... ~
6. Is sufficient undedicated acreage available in this pool ....... ~
7. Is well to be deviated ........................
8. Is operator the only affected party ................. ~
9. Can permit be approved before ten-day wait .............. ~
~0. Does operator have a bond in force .... ............... /~ ,
I I. Is a conservation order needed .................... ~
12. Is administrative approval needed .......... - ........
13. Is conductor string provided .................... /~/~
14. Is enough cement used to circulate on conductor and surface ..... ~'
15 Will cement tie in surface and intermediate or production strings . . .~
16. Will cement cover all known productive horizons ............
17. Will surface casing protect fresh water zones ............
18. Will ail casing give adequate safety in collapse, tension & burst . .
19, Does BOPE have sufficient pressure rating ..............
Additional Requirements'
Approval Recommended'
Geol o,Qy Engi nee ri nq:
TRM ~ HWK ~o~: OKG HHH ~
JAL ~,/~-~ LCS :- ~-JCM ~
/ '~ Revised 1/15/75