Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout186051MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Wednesday, October 22, 2025
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Bob Noble
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
A-35
PRUDHOE BAY UNIT A-35
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 10/22/2025
A-35
50-029-21313-00-00
185-051-0
W
SPT
8158
1850510 2040
852 855 853 854
0 0 0 0
4YRTST P
Bob Noble
9/1/2025
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UNIT A-35
Inspection Date:
Tubing
OA
Packer Depth
40 2315 2258 2242IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitRCN250904181713
BBL Pumped:5.2 BBL Returned:5.1
Wednesday, October 22, 2025 Page 1 of 1
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU R-27
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
186-051
50-029-21557-00-00
9880
Conductor
Surface
Intermediate
Production
Liner
9238
80
2650
8957
1148
9460
20"
13-3/8"
9-5/8"
7"
8868
37 - 117
37 - 2687
35 - 8992
8730 - 9878
37 - 117
37 - 2686
35 - 8462
8237 - 9236
9803, Unknown
2670
4760
7020
9460, 9540, 9709
5380
6870
8160
9395 - 9650
5-1/2" 17# x 4-1/2" 12.6# L80 31 - 8788
8812 - 9035
Structural
5-1/2" TIW HBBP Packer 8681, 8195
8681
8195
Torin Roschinger
Operations Manager
Josh Stephens
josh.stephens@hilcorp.com
(907)777-8420
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028282
31 - 8286
N/A
N/A
112
Well Not Online
9500 2192 714
750
1308
230
N/A
13b. Pools active after work:PRUDHOE OIL
No SSSV Installed
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 11:13 am, Aug 29, 2023
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662),
ou=Users
Date: 2023.08.28 15:43:46 -08'00'
Torin
Roschinger
(4662)
RBDMS JSB 083123
WCB 3-12-2024 DSR-8/29/23
ACTIVITY DATE SUMMARY
8/23/2023
***WELL SHUT IN ON ARRIVAL*** (DRIFT, ADPERF)
MIRU HES ELINE
WIND SPEED READING ABOVE 30MPH
MAINTENACE AND TOOL CHECKS FOR NEXT WELL
WEATHER NOT IMPORVING
POSTPONE JOB TO TOMORROW
***WELL SHUT IN ON DEPARTURE*** CONTINUE ON 24-AUG-2023 WSR
8/24/2023
***WELL SHUT IN ON ARRIVAL*** CONTINUED FROM 23-AUG-23 WSR
PT PCE 300PSI LOW, 3000PSI HIGH
DRIFT 3.05" DMY GUN TO 9455 DEPTH
CORRELATE TO SLB PERFORATION RECORD DATED 20-AUG-2018
PERFORATE 9395-9405 WITH 2.875" 6SPF 60PHASE HSC W/ MAXFORCE
CHARGES
CCL-TS=18.5', CCL STOP AT 9376.5'
RDMO HES ELINE
***WELL SHUT IN ON DEPARTURE*** JOB COMPLETE
Daily Report of Well Operations
PBU R-27
PERFORATE 9395-9405 WITH 2.875" 6SPF 60PHASE HSC W/ MAXFORCE
CHARGES