Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
210-079
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU F-47B Inject Water for Gas Suppression Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-079 50-029-22232-02-00 11648 Conductor Surface Intermediate Scab Liner/ Liner Liner 9048 80 3294 8998 3448 2753 11631 20" x 30" 13-3/8" 9-5/8" 7-5/8" x 7" 3-1/2" x 2-7/8" 9048 30 - 109 30 - 3324 29 - 9027 6006 - 9454 8895 - 11648 30 - 109 30 - 3324 29 - 8585 6006 - 8829 8492 - 9048 11624 2260 4760 4790 / 5410 10530 None 5020 6870 6890 / 7240 10160 9770 - 11620 4-1/2" 12.6# L-80 26 - 8920 9030 - 9048 Structural 4" Otis MHR Perm Packer 8861 8468 Torin Roschinger Operations Manager Finn Oestgaard finn.oestgaard@hilcorp.com 907.564.5026 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280 26 - 8510 Perforations 9770 - 11620'MD Pump 577,999-bbls of reserve pit water into well. Final pressure = 0-psi. 281 Well Test Not Available 30042 32 550 1600 1362 1000 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed 8861, 8468 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 3:14 pm, Oct 10, 2025 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.10.10 13:14:25 - 08'00' Torin Roschinger (4662) RBDMS JSB 101625 J.Lau 11/10/25 ACTIVITY DATE SUMMARY 8/11/2025 T/I/O = 2470/510/Vac. Temp = SI. Cold TIFL PASSED (pre injection). No AL. Initial IA FL @ 5520', (sta #4 DMY GLV), Self TIFL Monitored WHPs for 1 hr (see log) PASSED. IA FL unchanged. Final WHPs = 2470/510/Vac. SV, WV, SSV = C. MV = O. IA, OA = OTG. 02:30 8/15/2025 T/I/O = 2500/500/0 HPBD.Bullhead 5 bbl 50/50 spear followed by 295 bbls of 80 degree 1% KCL down tubing. Last 50 bbls was 5 bpm @ ~1000 psi. Well went on a vac upon shutdown. Pumped 38 bbls of 50/50 for freeze protect. FWHPS = 0/500/0 8/25/2025 T/I/O = 2450/490/VAC. Temp = 44°. WHPs (gas suppression). No AL. Injecting Pit Water. Injection rate at 8 BPM. 60,492 bbls injected from 8/17 through 8/24/25. WV = C. SV, SSV, MV = O. IA, OA = OTG. 16:30 9/1/2025 T/I/O = 2300/480/VAC. Temp = 45°. WHPs (gas suppression). No AL. Injecting pit water. 78,222 bbls pumped from 8/25 through 8/31/25. WV = C. SV, SSV, MV = O. IA, OA = OTG. 15:00 9/8/2025 T/I/O = 2200/480/VAC. Temp = 42°. WHP's (gas suppression). No AL. Injecting pit H2o. 82,656 bbls pumped (11,808 per day) from 09/01/25 to 09/07/25 WV = C. SV, SSV, MV = O. IA, OA = OTG. 10:30. 9/15/2025 T/I/O = 2125/480/VAC. Temp = 42°. WHP's (gas suppression). No AL. Injecting pit H2o. 81,372 bbls pumped (11,808 per day) from 09/08/25 to 09/14/25 WV = C. SV, SSV, MV = O. IA, OA = OTG. 10:00. 9/22/2025 T/I/O = 2100/470/VAC. Temp = 40°. WHP's (gas suppression). No AL. Injecting pit water. 91,742 bbls pumped from 09/15/25 to 09/21/25. WV = C. SV, SSV, MV = O. IA, OA = OTG. 02:30 9/30/2025 T/I/O = 1900/470/VAC. Temp = 31°. WHPs (gas suppression). No AL. Injecting pit water. 95,424 bbls pumped from 9/22/25 to 9/28/25. WV = C. SV, SSV, MV = O. IA, OA = OTG. 01:30 10/5/2025 T/I/O = SSV/490/VAC. Temp = SI. WHPs (gas suppression). No AL. Total volume pumped from 9/29/25 to 10/5/25 88,091 bbls. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:00 Daily Report of Well Operations PBU F-47B Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: (907) 564-4891 06/09/2025 Mr. Jack Lau Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor through 06/09/2025. Dear Mr. Lau, Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off with cement, corrosion inhibitor in the surface casing by conductor annulus through 06/09/2025. Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement fallback during the primary surface casing by conductor cement job. The remaining void space between the top of the cement and the top of the conductor is filled with a heavier than water corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached spreadsheets include the well names, API and PTD numbers, treatment dates and volumes. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations. If you have any additional questions, please contact me at 564-4891 or oliver.sternicki@hilcorp.com. Sincerely, Oliver Sternicki Well Integrity Supervisor Hilcorp North Slope, LLC Digitally signed by Oliver Sternicki (4525) DN: cn=Oliver Sternicki (4525) Date: 2025.06.09 14:30:46 - 08'00' Oliver Sternicki (4525) Hilcorp North Slope LLC.Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor Top-offReport of Sundry Operations (10-404)06/09/2025Well NamePTD #API #Initial top of cement (ft)Vol. of cement pumped (gal)Final top of cement (ft)Cement top off date Corrosion inhibitor (gal)Corrosion inhibitor/ sealant dateF-10C21308650029204100365/29/25F-29B2111475002921627026.25/29/25F-33A20816350029226400145/29/25F-3619519650029226310035/29/25F-39190141500292210100175/29/25F-44A2051615002922130012.55/29/25F-47B21007950029222320215/29/25L-2512231065002923772001.8813/31/24117/29/24L-2532230485002923758004.1201.13/31/24127/29/24L-2542230305002923752003.8321.23/31/24137/29/24L-2922230255002923751003.3301.33/31/24147/29/24N-282141275002923524006.8504.711/19/242212/28/24N-302141245002923523003.5330.311/17/243.512/28/24PAVE1-122309450029237670019.910/27/24PWDW3-221908150029236340014.810/27/24S-40120607850029233130015.31130.511/15/24412/28/245/29/25F-47B2100795002922232021 STATE OF ALASKA • 'CA OIL AND GAS CONSERVATION COM ON ` RErvRT OF SUNDRY WELL OPE ONS 1 Operations Abandon U Repair Well U Plug Perforations U Perforate U Other L1 Performed- Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extensions Change Approved Program ❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2 Operator 4 Well Class Before Work. 5 Permit to Drill Number. Name BP Exploration(Alaska),Inc Developmert❑✓ Exploratory ❑ 210-079-0 3 Address P O Box 196612 Stratigraphic❑ Service ❑ 6 API Number. Anchorage,AK 99519-6612 50-029-22232-02-00 7 Property Designation(Lease Number) 8 Well Name and Number ADL0028280 PBU F-47B 9 Logs(List logs and submit electronic and printed data per 20AAC25 071) 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary RECEIVED Total Depth measured 11648 feet Plugs measured None feet true vertical 9048 43 feet Junk measured 11624 feet MAR 2 7 2015 Effective Depth measured 11631 feet Packer measured See Attachment feet 4�(3 c C true vertical 9048 43 feet true vertical See Attachment feet �! V Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"x 30" 29-109 29-109 0 0 Surface 3294 13-3/8"68#NT-80 30-3324 30-3323 95 5020 2260 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth See Attachment feet True Vertical depth See Attachment feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12 6#L-80 26-8920 26-8510 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured) SCANMEp)& , Treatment descriptions including volumes used and final pressure- 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 152 5367 15 0 170 Subsequent to operation 564 15849 56 0 233 14 Attachments 15 Well Class after work Copies of Logs and Surveys Run Exploratory❑ Development Q Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil U Gas ❑ WDSPL❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUcf 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt N/A Contact Nita Summerhays Email Nita.Summerhays(c7bp.com Printed Name Nita ummerh- Title _ _ Petrotechnical Data Engineer Signator _ ` .i�/i - - 1/ Phone 564-4035 Date 3/27/2015 177� ¢1111 RBDMS� APR - 3 2015 Form 10-404 Revised 10/2012 Submit Original Only I J U b b 2 J � O E co) (o O 'J �(7 0 C a O 2 -p co J c O co o a) c� 1O Z �U L =O O c () (o = _ "6 "O a. (I) "6 m : u Q .) L 4, to .Q J , O_Q = O O *K . - opoU) It) a 0 � It) 2 (o `n o 0 a) C O O N C (o Q O •- � s- °- ' o4* N 0) E 3 +' O N O C N -C t� c e a3 O 0) 0)O O) ` O 0 3 co * w 't c 7 O , _ O v � 0 Q-.Ob Q Nom = C UZ Oo cX od' z D -a00 p a) 0 �c., — 2 -8 °' 0 3 cprx co r c.N NOU a) -o eaN U >O U 42)Q _ N C\I Oc (n * N O O N * N L7 Q LU N ) LL .c 0 00 a C OV N a -0 CL d0' G co -0 d 0 o a) a CO o c v o T3 o a � �Qmod 4Q " : 2o - t Q 79u) �- U"- OajNa- oocN taj " a) t Q o w N D C p cob" 0 Q N a) - 0 t 3 - o Q X (n to _ — fA c063 *� U) ' ,- -a NCIS "a a- Q- O a * N N d ? U pN a) y a) c0 V ca O Cfl _c (o a) O al co E a) .J c a) T- > "a 'C CC r LL 9+ N ,.- Q N = e' OU O ( N O fl- m : =c 0 C (� =0 L .O 0 (o c 0 Q U CO a) CI - (oQ ,yQ - ui 0) co -OO QO _ co 2 a) Lo N = in C p _0 a) -O LO *k = d 0_ = O a) c Q 3 c 1— O 3 a ,_ o Q ~ c 3 L d N o ..a 0 co ami U _ .E. co c a) U Q Dim c) -0D o_-c _c00D 0,� o o v I- - D Q 0) 0 2 = 0 CJ 2 -o cin � 3 � : U -I rn N : a) O 00 cc N N O O O N N N O O N N Pz N N N N (11 CAd a N to CO _ CO N N M I�10 N- LO CO V t 0 a M in tb Lo CO CO "1f CO ct CO LLI 0 0 0) 0 0 0 0 0 0 'Cr >O p 0) 0) O 0) 0) O 0) > cc 0 W Z LLI p 0w O W CL p Q• I- U O > J J 0.0 O O W Y Y g co N CN N CO 0) 6) ‘ZrN - - J 0 0 w W t CO CO N CO N r- N CO OD LU J J J Q Q W CC Q- O V N (6 O O oO in V V aiQ Q Q W a a Z 0 p 0 0 0 0 0 0 0 0 0 0 0 Z 22 O J J J p 0 a) a) c) rnrnrnrnrnrnrn Q Q c = o , _10 o a l a > 0 0 0 w Z CD Z W W W d H H Q J Q O v) cn W co cn a) to to CO = 00 0 0 0 0 0 1.0 0 0 0 .F+ a N- cc co co `---. O O N N CO C a) 00 c0 0 0) 0 0 0 0 p 0 0 0 0 0 C- l- T- c- E U)CD R a) Q_ V) J = H H0 d J d C.) O 2 2 2 O cn co u) w cn trtCo QQ ... N 0 O C O L 0 co 0 0 0 0 C L6 O 00 O J a N to LU M N- _ O o a) N- cccce00000 Ov I < p a) a) a) 0) 0 0 0 0 0 tQ to L a) O E 1.1L a) — CL a) 0 0 c O LL IL LL IL U_ U_ IL LL N t m a. 0- W W d d O W O W W `0 QQQQQQQQcndd a 0 t a) a 0 w -J J I- D a) d D LU 0 to Ln V Ln Ln Ln V co O 0p c- - 0 < OO O O O O O O O W J J Zti NNNNNNNNNNN Z d a w W W .17,' r- N O a) O O O N O Lo Lo 0 w W W J W WLL cc N N N N M Z a ° C7 o W W W W a N M -60 c N N N a0 CO cc M p (2 O J J = _ w W 0 < < m m u. ti co d O a) E m Z m m m m m m m m m M m N- N- N- N- N- N- N- N- N- N- N- V) 1 ; 1 t 1 V CO d Cl_ Ci) O J LL 0 0 w d LL LL Ll. LL LL U Li. Li. LL LL LL < < CO CO LL LL 0 CO d CC a) eL O o 0 0 0 o (0 0 0 0 0 N Nco CO CO O O • VI- N- N Ln 0 LO N-- LO Cv) V N N- U OO Co L CO100 (0 (100000 CSO O CO m co CO (- N- M O O CO CO LO CO M V r- V' V V CO CO 10 Ln oM CO O CO CO O �' CO CA O O) CO N N O) 0 LO CO CO CO CA CO O M CO CO O LO CO M ONO co CNO CNO O V M co O Ln CD N N N CO Cb co ao co CO O) Cb Cb M M LO r' CO Cb H Ln I- ti Ln CO t CO LO O) LO - CO CO CO CO O N CO O CO 0) CO N V O LO LO LO 4 M N O O 0 0 0 Cb of CA Cp N O CO CO O co O O N N Ch N o LO O co co co V N- CA LO .-- N CO CO CO CO CO CO CO CO CO N Ln I,- CO CO O CO CO V V (A V N V' O (` N- O CO In LO LO LO LO CO CO NNNON CO O) O O I� N V r CO CO CO O CO O O LO - LO N- S CO O CO 0) O) CA CO 0) CO CO CO Ln N- CO CO ✓ 0 COQ I +x'+ 002 N M N- N- CO - LO CA v O) O co CO CO CO CT o V V in CO O CO O) CO O CO O) N N- CO O) Cr) CEJ N O N- N- N- CO CO CO N CO CO N O LO LO CO O CO CO CO CO CO co O) CO N LO N- CO CO xxxxx O 00- aaO Ln co o 0 0 c' o 2 2 2 2 Q IL O coOo 0O c) ao 0 co i CO H H H H H - J ~ J (0 (13 (D (0 CO Z co co J Z L L L. d OM Z M J C.O N4* 4 4* N N N CL) (U •� x o 0 It (0 CO O) CO V• CO c- (ll N (ll o a) N CV CV N CV p0 N CO - CO C\O - > > > A > M N- N N Ln - CO N N N N 0 M N O N Cr) N C) W N N H H H H t r ON- O CO o Ln () t co O O O O N CO CO N CO CO N- N- M N- d N N- O L N CO ' M CO J Z Z 00 w C U O O 0 U�a o CC CC CC fY CC CC oc o z w w w w w Zwwwwwww00IYCO � � JJ _J O Z Z Z Z Z Z Z o a D D < < < < < U J J J J J J J O_ O_ U) H > > > > > ilit Packers and SSV's Attachment ADL0028280 SW Name Type MD TVD Depscription F-47B PACKER 6016 6015.85 7-5/8" S-6 Liner Top Packer F-47B PACKER 8861 8468.25 4-1/2" Otis MHR Packer TREE= 4-1/16"5M CNV IIFY NOTES: WELL ANGLE> 70°(9809' WELLFEAD= 11"5M FNC F-4/ B ACTUATOR= BAKER NTIAL KB.ELE 65.31' BF.BEV= 35.46' KOP= 6341' X19• —44-1/2'0715 OBE SSV ND=3.813" Max Angle= 95°@ 11460' Datum NO= 9521' O GAS LFT MANDRELS NL Datum D= 8800'SS ST MD ND DEV TYPE VLV LATCH PORT DATE 5 2999 2999 0 MERLA DONE BI?K 16 06/06/14 13-3/8"CSG,68#,NT-80 CY FE,D=12.415" H 3324 4 5520 5520 1 MERLA SO BK 20 06/06/14 L 3 7173 7114 32 MERA MY BK 0 05/09/92 2 8588 8259 34 NEF A MY BK 0 05/09/92 TOP OF 7-5/8"SCAB LNR H 6016' 1 8698 8348 39 MERA OMY BK 0 05/09/92 6016' —19-5/8"X 7"11W TE-BK.LTPw/HGR=6.88' 7-5/8"SCAB LNR,29-7#,NT-95," — 8737' 0 .0459 bpf,D=6.875 • il TOP OF 7"LIAR —{ 8747' 8747' H9-5/8"X 7"TW DTH HGR - I I 8809' —4-1/2"PARKER SWS NP,D=3.813" Minimum ID = 2.377" @ 9389' 3-1/2" X 2-7/8" XO _ _ c 1 8861' 11 7 "X 4"OTIS BORE Pf3RM PKR,D=3.875" 8886' H4-112"PARKER SWS M',13=3.813" 1 1----I 8895' H3.70"BKR DEPLOYMENT SLV,D=3.00" I ' 890T H4-1/2"PARKER SWN MP,D=3.725' 4-1/2"TBG, 12.6#,L-80 BTC-MOO, --I 8921' — BEHIND .0152 bpf,D=3.958" 1 8920' H4-1/2"M.LESHOE WLEG,D=3.875" CT LNR 8922' HELMD TT LOGGED 03/28/96 9-5/8'CSG,47#,L-80 BTIRS,13=8.681" H 9027' } A , ,11 1'1� 9300' —{TOC(08/03/10) 7"LNR,29#,N-80,.0371 bpf,I)=6.184" --4 9454' 11111 P1�V1 111 111 9389' H3-1/2'x 2-7/8"x0,D=2.377" 7"WHFSTOCK 9454' X1111 ►1111 $$••$ 1111 PERFORATION SIARY 11111 11111 M 11111 ►1111 REF LOG:SLB MCNJGR/CCL ON 08/04/10 ,11111 11111 ANGLE AT TOP FERE 63°@ 9770' 11114 144 044. 111 111 MLLOLTT WINDOW(F-4713): 9454-9463' Note:Refer to Production DB for historical pert data 0:11' 4. SIZE SPF 1VTERVAL Opn/Sgz SHOT SQZ 4 V., 4 . 2" 6 9770-9790 0 02/21/15 .V4�4 2" 6 9810-9840 0 08/12/14 ` 11624' CTMD —3-1/2"CSP DEBRIS MLLED 2" 6 9850-9910 0 08/10/14 &PUSHED(07/03/13) 2" 6 9930-9960 0 02/21/15 2" 6 9970-10000 0 02/21/15 2" 6 10010-10040 0 02/21/15 2" 6 1000110-10870 S 08/05/10 06/30/13 ,14111.1 2' 6 11000-11220 0 08/05/10 FBTD H 11631' 2" 6 11470-11620 0 08/05/10 2-7/8"LNR 6.16#,STL,L-80,.0058 bpf,0=2.441' —{ 11648' DATE REV BY COM E:NTS DATE REV BY COMMENTS FRU:ME BAY IMT 02/25/92 N9E5 INTIAL 09/02/14 TFA/JMD ADFERFS(08/10/14) VUB_L F-47B 05111/92 D16 ORIGINAL COM PLETIM 09/03/14 PJC PERF ODRRECTIONS PEWIT No:"1100790 04/01/00 CTD CTD SIDETRACK(F-47B) 02/21/15 MSS/PJC ADPERFS AA No: 50-029-22232-02 10 NORDIC1'CTD SIDETRACK(F-47B) SEC 2,T11N,RI3E,2400'FSL 8 2193'FH. 06/03/14 NBMJMD GLV GO(05/30/14) 06/09/14 A/MJN&GLV GO(06/06/14) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. a 1 0 - 07g Well History File Identifier Organizing(done) ❑ Two-sided III(I'III II III lIl ❑ Rescan Needed II 1[liii IIIIIII RES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: reyscale Items: Other, No/Type: 0 No, i ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Date: l d3 `if /s/ cm? Project Proofing 1 1111111111 II III BY: Maria Date: 1 - Is/ imp Scanning Preparation a x 30 = 0 0 + I = TOTAL PAGES 40 1 (Count does not include cover sheet) BY: Date: 1J13 I /s/ Production Scanning ifi 111 111111 11111 Stage 1 Page Count from Scanned File: 1 (Count does include cover eet) Page Count Matches Number in Scanning Preparation: YES (VI NO BY: AD Date:/ 3 /(1 /s/ r Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: Is/ Scanning is complete at this point unless rescanning is required. III 111111 I111I 11 III ReScanned 1 11111111110 11111 BY: Maria Date: /s/ Comments about this file: Quality Checked II liii Ill III III 12/22/2011 Well History File Cover Page.doc o c o . N m o 4 g N Co LL C N Z 0 •- Z a) 0 co U m O 0 J c.) 5 : c 9 a) . O aE)z O Z a 2 o O O t > z > Z i o U 0 y cn UU co d u) c O J 2U J 1 Q I To o v 0 o> 0 0 0 0 0 a m N N N N N J N N N y O N N N_ Z J ■-• .- N 2 _ E C Q 2 — C C C C C a) a) C O u) as 1 c 0 = a O. o. a n m m Cl) E i". Y O U O O O O O D U 0 U Q Q CO Li m a� a CO CO CO ao 0 CO co CO z w1 g s d d z z_ :� A/ O - m M M Tr 0)) co 0 1J� a (C0 0)) 0)) o) 0)) co co c coo 0)) �• v W W J a) V m a. 0 , o u) Z C a) o ce Q W z o 0 J a) Co j = .t CL O� z °y O O O 7 C T E C r O 1 Z H J 0 0 0 m 91) 0 lL C O a) u) LL a) ON EO O. F' J N N CC) CC) CC) V 0 ml U CD CD I 0 Q m o0 I 0 - LL > 0. r ~ d 5 • O 2 0 Co N • N J d CO a co z m Co U '= O a) 0 V, = co co Q a ° g la) a o Q o E Z O > > Q Z U � o a 2 2 J CO 0 M i� m m m m I d j''I a). o o Co m m CC Co ! ■ a) ° c E v '0 E E E o o E v 1 m 0 a) E E E > > E I o 1 rn 1 y Z 0 0 0 0 0 Z Z 0 coo z 1 o) 1 E O m > O J y a N O _ V v C >-O Q c C W O z N N N re O O Y a) O O ! 1I €O) J N z Q O co 0 2 U c`• +� 2 \ 0 a) E 5 re z LT oc4 Q w J ,J �j F_ U n T.� E a) O W Q o. m 0+� o. 0 a o 0 o O o 0 a 0 >a) t c m o d R' O H J a ?. W IX J J J W J W 3 Q > 0 <CL 1 0 1 0 9 N 9 N M N Z N N rn U ' o 0 in O Z a 3 a Z x Ol 7 ; cry f0 co r J cn G 1 OC < O ED- Z CL O U IX 0 J 0. W W J O m o Z Q_ Y L. 0 7 J o CL co N C C o C N y O a E U U c0 m Q v rs LL I-- Z O C o G/ N co W m CO = 0 a> CO� 0 in Q c4 a. O a a Q Z E to z m • c rn • 1 0 a) F m Ts ° 3 N d N re O co u O C .. • CO E a m 0 o a C.) tittoi;t1VCU • STATE OF ALASKA JUL 2 4 2013 . A.. ...)KA OIL AND GAS CONSERVATION COMM._.ION REPORT OF SUNDRY WELL OPERATIONS AOGCC 1 1.Operations Abandon U Repair Well U Plug Perforations U Perforate U Other Li Cement Squeeze Performed: Alter Casing ❑ Pull Tubing0 Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc . Development o ' Exploratory ❑ 210-079-0 3.Address: P.O.Box 196612 StratigraphiC Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-22232-02-00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028280 PBU F-47B ! 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): To Be Submitted PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured 11648 feet • Plugs measured None feet true vertical 9048.43 feet Junk measured 11624 feet Effective Depth measured 11631 feet Packer measured See Attachment feet true vertical 9048.43 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"Conductor 30-110 30-110 0 0 Surface 3293 13-3/8"68#NT-80 31-3324 31-3323.95 5020 2260 Intermediate None None None None None None Production 8997 9-5/8"47#NT-80 29-9026 29-8584.01 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10110-10870 feet 11000-11220 feet 11470-11620 feet True Vertical depth 9054.34-9053.51 feet 9054.64-9054.37 feet 9049.57-9048.43 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 27-8920 27-8510 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): 10110'-10870' Treatment descriptions including volumes used and final pressure: 24 BBL 12%HCL,31 BBL SQUEEZE CRETE,200 BBL ORGANOSEAL 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 478 31081 44 0 1109 Subsequent to operation: 0 0 0 0 0 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development S Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil 0 Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCJ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Nita Summerhays Email Nita.Summerhays(cilBP.com Printed Na a ummerh. Title Petrotechnical Data Technician kit l'Sign to c i ice/ 4 , „� //, ,/A�„ Phone 564-4035 Date 7/23/2013 /(14 . - RBbMS AUG — 2 2 Form 10-404 Revised 10/2012 PO Submit Original Only Daily Report of Well Operations ADL0028280 ***WELL S/I ON ARRIVAL***(profile-mod) CURRENTLY STANDING BY DUE TO LIGHTNING 6/20/2013 ***CONT ON 06/21/13 WSR*** T/I/O= 2150/1120/0. Temp= SI. IA FL (SL request). No AL. IA FL @ 5350', 1/0' above Sta#4 OGLV (287 bbls). 6/21/2013 SL in control of well on departure. 'T/I/0=2143/2122/0 Temp=S/I Assist SLB w/ L&T, MIT-IA to 2500 PSI PASSED (Cement squeeze) Pumped 5 bbls MEOH followed by 354 bbls crude to load IA. Pumped 5 bbls crude for MIT-IA. 1st 15 min IAP lost 128 & 2nd 15 min IAP lost 55 for a total IAP loss of 183 in 30 min. Bled back— 5 bbls. Freeze protect flowline with 10 bbls meth, 67 bbls 6/21/2013 crude. FWHP's=1786/0/0 SLB on well at departure ***CONT FROM 06/20/13 WSR***(profile-mod) DRIFT W/2.25" CENT & 1-3/4" S. BAILER TO DEV @ 9816' SLM NO OBSTRUCTIONS. NO SAMPLE PULLED ST#4 BK-OGLV @ 5509' SLM (5520' MD) PULLED ST#5 BK-LGLV @ 2986' SLM (2999' MD) SET ST#5 BK-DGLV @ 2986' SLM (2999' MD) LRS LOADS IA W/5 BBLS METH, 354 BBLS CRUDE SET ST#4 BK-DGLV @ 5509' SLM (5520' MD) LRS PERFORMS A PASSING MIT-IA TO 2500 psi 6/21/2013 ***CONT ON 06/21/13 WSR*** ***CONT FROM 06/21/13 WSR***(profile-mod) R/D SWCP 4518 AFTER SETTING DGLV's 6/22/2013 ***WELL S/I ON DEPARTURE, PAD OP NOTIFIED*** CTU 6 w/ 1.75" CT Scope; Drift, log, Set CBP, OrganoSeal & SqueezeCRETE. MU WFD: MHA Disco 2.1875", PDS Gamma Ray/ CCL 2.20" Carrier, (OAL 13.80') RIH with Drift with PDS logging tools down to 11600 ft. PUH logging at 40 ft/min. Painted white flag at 10800', resume logging UH. Received good data from logging run +5.25 ft. shift. MU WFD MHA Disco 2.1875",X-over 2", 2-Stinger 2", JSN 2" (OAL 10.583). RIH for acid stim across perfs. Pump/Reciprocate 28 bbls 12% HCL across perfs &over displ w/300 bbls KCL. RD stingers/Noz etc, MU WFD setting tools and 2.875" CBP, OAL 9.53'. PT & RIH. 6/28/2013 ***Job in Progress*** CTU 6 w/ 1.75" CT Scope; Drift, log, Set CBP, OrganoSeal & SqueezeCRETE. Cont RIH w/WFD 2.875" CBP & setting assembly. Good indication plug set @ 10900', 2800 psi. Pull out of liner , injection test down backside, holding 10-psi @ 2 BPM, 125 psi @ 2,5 BPM. POOH. Ball recovered, RD WFD setting tools, chain inspection/change pack offs. BHA: CTC 1.9", 2-Stingers 2", BDJSN 1.75", (OAL 8.0') . Pump 200 bbls of Organaseal down Pump pressure 2240 psi W.H. at 2 bbls/min. down CTCBS with CT at surface 212 bbls, 20 bbls FW, 87 bbls Diesel, IA 1054 psi OA 0 psi. RIH. Pump fresh water& displ 0- Seal into perfs, PU to LT& pump 31 bbl's 14 PPG Sqz Crete, sqz 11 bbl's cmt past top perf. Holding 3000 psi WHP sqz press. 6/29/2013 «<JOB IN PROGRESS>>> CTU 6 w/1.75" CT Scope; Drift, log, Set CBP, OrganoSeal & SqueezeCRETE. Holding 3000 sqz on Tbg. 11 bbls sqz Crete past top perf. sqz press 3044. lost 60 psi in 30-minutes. C/O to CBP w/Pwr Visc, POOH chasing out. Left Pwr Visc in liner from CBP to 9400'. Wash Jewellry &tree on way OOH. FP w/50/50 meth to 2500'. Left 350 psi SIWHP. 6/30/2013 «<JOB COMPLETE>>> Daily Report of Well Operations ADL0028280 T/I/O= 62/399/0 ( MITxT to 3000 Psi PASSED ) Rig to TBG via Choke Skid. Pump x bbls diesel down TBG to achieve a test pressure of 1500 psi. ( MITxT ) TBG lost 88 psi in 1st 15 min and lost 37 psi in 2nd 15 min for a total loss of 125 psi in 30 min test. RDMO/ FWHP= 59/398/0 wing=shut/swab=shut/ssv=shut/ master=open / IA and OA open to 7/2/2013 gauges. Operator notified of departure. CT-8 1 3/4" Scope of work: Milling out cmt/CBP. Depart DS-3-15, travel to location, sign permits, start RU. 7/2/2013 «<JOB IN PROGRESS»> CT-8 1 3/4" Scope of work: Milling out cmt/CBP Cont RU, PU PCE, stab on injector. MU BTT Milling assembly 1.69" OD x 23.26' OAL w/2.3" PB mill. PT RIH. Tagged plug @ 10908' pump sweep around off bottom, back reaming up to top pert. Pressure test wellbore at 1500 psi one last time after clean out past all perfs. prior to milling out plug. Begin milling Composite bridge plug tag depth 10907'. POOH check motor mill, not making any progress, last tag 10884'. LD BHA, Burst disk ruptured in circ sub, Disco leaking at mid point. MU 2.30" 3 Bladed Junk Mill BHA w/o bypass sub. RIH. Set down above perfs @ 10004'. Pump min rate and RIH clean past plug depth of 10,900'. Push plug to 11197', SD, Pump full rate and push plug to 11624.5' CTM. POOH. 7/3/2013 «<JOB IN PROGRESS»> CT-8 1 3/4" Scope of work: Milling out cmt/CBP Cont POOH,At surface FP to 2500'w/50/50 meth. RD BTT milling assembly, RD. MOL. 7/4/2013 «<JOB COMPLETE»» ***WELL S/I ON ARRIVAL***(profile-mod) SET 4-1/2" WHIDDON C-SUB ON 2-7/8" LNR TOP @ 8,895' MD. PULL BK-DGLV FROM ST#4 @ (5,520' MD) & BK-DGLV FROM ST#5 (2,999' MD). SET BK-LGLV (1500#TRO, 1/4") IN ST#5 @ (2,999' MD). SET BK-LGLV (1450#TRO, 1/4") IN ST#4 @ (5,520' MD). PULLED WHIDDON C-SUB FROM 8,895' MD. 7/5/2013 ***WELL LEFT S/I ON DEPARTURE*** FLUIDS PUMPED BBLS 92 DIESEL 421 CRUDE 29 METH 1522 2% SLICK KCL 24 12% HCL 31 SQUEEZE CRETE 200 ORGANOSEAL 20 FRESH WATER 11 CEMENT 207 POWERVIS 121 50/50 METH 2678 TOTAL m co c.o ) N. o� M N N- V (O V O� N co co a) U O M COD � CO m r r •- CO O O O) N 03 0 CO M r- CO N O) 00 N co co O to co co co 0 03 0) CO M • i i I i i i i i FFF--- r- 0 •zr co co M co In In N O) O) r M o 00 0 0 N M N o M CO CO CO CO CO LO CO co • N •zt co O co co L CO O O) O) co CO CO 2 N CO oov0) 00CD - N- 0) (V M o 1� o CO N Cr) N C co00OO) 23 0 � J ~ Q o 0 0 o a co I I co a) 9) a°o � J � � 'i Z •N m -oZZN ((o * k ((1) U N N -0O 0000 CV N M N CA M 4 t ✓.+ O M N u) O) O) O) d O CV O N co 0 M co 0 Z O O W H ? U % ✓ Z W W W W O cc m O Z Z Z Z c D D O JJJJdU) I- Packers and SSV's Attachment ADL0028280 SW Name Type MD TVD Depscription F-47B PACKER 6016 5950.54 7"TIW Liner Top PKR F-47B PACKER 8861 8402.94 4"Otis Bore Perm Packer TREE= 4-1/16"5M CfW Si Y NOTES: WELL ANGLE> 70°t 9809' VVI3_LHEAD= 11"5M FfvC F-4 7 B ACTUATOR= BAKE INTIAL KB,ELE 65.31' E3F.ELEV= 35.46' KOP= 6341' 2219' —14-1/2"OT IS DBE SSV MP,13=3 813" Max Angle= 95°@ 11460' 0 Datum PA)= 9521' GAS FT MANDRELS Datum TVD= 8800'SS ST 11A3 IVD DEV TYPE VLV LATCH FORT DATE 13-3/8"CSG,68#,NT-80 CYI-E,ID=12.415" — 3324' 5 2999 2999 0 MBRLA DONE BK 16 07/05/13 4 5520 5520 1 MERLA DOW. BK 16 07/05/13 3 7173 7114 32 MERLA DM' BK 0 05/09/92 2 8588 8259 34 MERLA DM' BK 0 05/09/92 TOP OF 7-5/8"SCAB LNR 6016' 6- rs- 1 8698 8348 39 MERLA DM' BK 0 05/09/92 '4 • •4 A • • 6016' —9-5/8"X r T1W TIE-BK,LTPw I HGR=6.88" 7-5/8"SCAB L.M2,29-7#,NT-95," H 8737' 0 . 0 0 4 4 .0459 bpf,D=6.875 I 4 ,ok o, IP V 4 TOP OF 7"LINER 111=5111 O. 6) 874T —19-518-X 7"TM/DTH HGR Minimum ID = 2.38" @ 8867' 8809' --14-1/2"PARKER SWS MP 0=3.813" 2-7/8" LNR TOP, PIN I.D. IIM 8861' Hr X 4"OTIS BORE paw FKR,ID=3.875' III11 8886' —14-1/2"mPA:EsERHoSEVVSw NP,ID 8895' —3 70"BKR DEPLOY rowr so', I ill 890T -4-1/2"PARKER SWN NIP ID=3.725" .. 4-1/2"TBG, 12,6#,L-80 BTC-MOD, 8921' BEfiND 8920'.0152 bpf,D=3.958" DID==33..881735a" D z"0";LNR 8922' H B_M-.)TT LOGGED 03/28/96 9-5/8*CSG,47#,L-80 MRS,13=8.681" —1. 902T re4 r#1 9300' --TOC(08/03/10) ..• ir:e 4.4 I•• 9389' —I 3-1/2"x 2-7/8"XO,ID=2377' ■••' *0 ••• I** **1 I** ■•• **I ••• I** 0** *0 ■••• **I ••• 1.4 ■•*, *41 1 7"LNR,29#,N-80,.0371 bpf,ID=6.184" ■••• *41 ••• ■•• ML LOUT WIDOW(F-479): 9454-9463' 1-7"WHIPSTOCK --1- 9454' '4# 0, PERFORATION SUMMARY 11624' CTMD —3-1/2'CIBP DEBRIS MILLED REF LOG:SLB MCINUGR/CCL.ON 08/04/10 &PUSHED(07/03/13) ANGLE AT TOP PERE 88"@ 11000' lilt Mate.Refer to Production DB for historical perf data SIZE SPF INTERVAL , Opn/Sqz SHOT SOZ r, 2" 6 10110.- 10870 S 08/05/10 06/30/13 •■ ...., 2" 6 11000- 11220 0 08/05/10 4.0" 2" 6 11470- 11620 0 08/05/10 FEITD —1 11631' 2-7/8"LNR,6 16#,STL,L-80,.0058 bpf,0=2.441" --I 11648' DATE REV BY COMIVENTS DATE REV BY COMME34TS PRUDHOE BAY UNIT 02/25/92 N9ES INITIAL 09/26/10 PJC GLV CORRECTION WELL F-47B 05/11/92 DI 6 ORIGINAL COMPLETION 06/25/13 CJN/JMID GLV C/0(06/21/13) Fl3RMT No:*2100790 04/01100 CTD CTD SIDETRACK(F-47B) 06/25/13 TJFVJM3 OTIS NP CORRECTION API Na 50-029-22232-02 08/06/10 NORDIC1 CTD SIDETRACK(F-4713) 07/16/13 JGUJMD CMT S07/14ALLED CEP(06/30-07/03/13) SEC 2,T11N,R13E,2400'FSL&2193'Fa 08/10/10 SV DRLG HO CORRE-CT1ONS 07/16/13 ALWItot)GLV C/O(07/05/13) 08/22/10 RCT/AGR GLV C/O(08/10/10) BP Exploration(Alaska) 0 . 223\q- D lD W 'V X ID j U'i G w 9 a m a= CL -0 D- O m 0 rD 0 * m Cn 'n t N C) C) G) G) C) C) m -n N CA T1 m 0 0 Z '�. O v v z = m 7 cu D r N J N p N W W N N C7 N O C) N C7 0 -• -L •P N N -u D 3 0 m 3 m E n0i N. CAD v7i 7o � N A N '' A W t)1 A — 1 CD 00 W N V 0 CD CO .. Cr Oo o ^' ] > CO CD D > m D CO C) CO CO CO 0 0 CO D W CO W > C) m D f) Cp rD 1:3 D 7 N ° V °� n W lL - ,,, -- 18 _CD N In up < O. ntic' v In __,.V' -t — O CFri O Ul C) C) C) W C) W W 0 W W W C) C) C) C) W W W W 0 W C) ar` l" o CD 0o ro al w 01 D Q1 D 0 N D D D rn N rn rn D D 0 0 01 0 u1 440 1--‘ o MEI >C Z X C O C c' C C C O x C C x x o �I 0 o D o c_ O c_ 0 n L L L O O O C_ c— C) C) C) p o CO -< 0 0 0 0 0 00 00 0 o0 00 00 00 00 00 00 00 00 00 00 00 00 00 0.A .0 �' •� N 0 A O 0 CA _. 0 C)1 Cif A N A 0 N N A OAf N O z CD O N 0 CO at O N A O GI -• V, Cfl co A 0 N C,,, CA O .. a r ',71� > 0 D 5} m X x a, x x x x x x x x x x x x x x x x x x x x v, Et w , z 'e A W 0 E c 3 3 3 E 3 c 3 E 3 lI 3 3 -o 3 3 3 3 3 3 3 C) Cn C) C) C) C) C) Cl) 0 C) 0 11 C) 0 -0 C) C) C) C) C) C) C) z =i Z Z Z Z Z -I Z Z Z Z Z 0 Z Z Z Z Z Z Z r 0 r r r r r 0 r r r O r r 0 r r r r r r r CO CO Ir Wr - O -o -u - 0 0 m mm O O co D m = x 3 3 D X — m x z 0 C) —I 3 z z `v- D. r CO O if i 4 > < 17 X s N N W .a N -� N Co) N - I r ID 7 G CD CO W co O) — W al — 0 C71 o O N N C"3 03 W O1 0 0 o r,';,? .i ,t7 H. 1-+ S fD N 0 L L < Z Z 0 p `. ',A1 /'1 L 6z6416i. LLLL L3 O a, c),,, ° 7 [�D k? -0a n Q A O n CD O C C C C C C C rt 0 < < n G) A) Cu CD "C7 < �, Q 7 ca .� m rt pq N N N r N 0 r Cli CD U, C N N N W N N N W N N 1J N N N N IV N N N k�';'a tf1 2) W N xl m:' ill. N ti t�fC °� pq' Z J ∎Ji l'I O 7 rl2 (D W Q '\ Cn, i^1 - Z. '6 ' :fa l7 �' CD• O• 1'�1 —I m w C? O NI .tea _) nib O 000000000000000000000 ti O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J 2 ■02\ W to r VP,. ,'Sp ® 0000000000000 V 1:,1x O O O U O O O O O O O O U O F G U ,, 'E5 j cd O''— O O O cc " N NO 4,..) o_ CL„49 0 co o .5 • F 'v v) U '� =W :i �': r m r r r C O M N U1 Cl) °p v rn }W U co m.1 `^ 9 rn W ti C coo Q 03 L N N N N N N N N N N 7 (.7 N �• Q e- e- e- r r e- r r r U'1 OA �4 W Lu > 0. Fay Y y.+ • i+ .W 0. .0 i+ t, yam, �- N OS .-y Q C'' - H;� V i9 V CT t9 U tl C9 V N t) V C9 t9 N N O x as 43 0, 0 00 0,0 0 0 0 O O ua 0 0 0 0 t ,4 ✓ aoo .4cno® � c , di, ck, ao �'� wosw (a V1 u (l V] (' , N N N N N N N r r- r X c 0 Q -"--,i7.4, itry", i- 0 J _1 c. I1 0 u' LL V. (n N W O W IX O W IX W O LS 002 ZceJ Q , 1- 0 , 0 _I0.) �? 4a _1 3a3aa U ir 0 z 0 0 1- O 0 0 U 0 0 0 Z2IxF- gz 22I- 02022 a ur a Cl) 0 0 W W N W W W W _; E— u. 2° — N O ei ei O t0 a F-- Z Z A..) o o, ey ii > cc i- z ui y.'!) X X X X X X X X X X X X X X Q O• M I-- 111111 2 if., O Q N ,0 nuuuuuuu •iii , W N N O 0 0 Q 0 O O Ca O V) O } -i >' U O > d U 4 4 o 0 I- ° .�+ CO Q Ca co N U ce ccoo Q U csi o o CO U CO n U O U m U U c o CU O op -0 N CN N Q1 R ro -CO Y •� N p t0 N M O O E r-4 C a a`, a i ! IIH— CV V a1 d O f 10 V1 0 > N Q ,.__ X d m Cr) Q BAKER IW HES Baker Atlas PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION(ALASKA)INC COUNTY NORTH SLOPE BOROUGH WELL NAME F-47B STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 2/1/2011 THIS DISTRIBUTION LIST AUTHORIZED BY: Alfredo Martinez SO#:3235172 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION(ALASKA)INC 1 Company DNR-DIVISION OF OIL&GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE,AK 99508 ANCHORAGE,AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON,TX 77002 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By:BAKER ATLAS-PDC 17015 Aldine Westfield,Houston,Texas 77073 This Distribution List Completed By: a` V Page 1 of 1 BAKER F4UJGFUES Baker Atlas PRINT DISTRIBUTION LIST COMPANY BP EXPLOKATION(ALASKA)INC COUNTY N(JRIH SLOPE BOKOUGH WELL NAME F-47B STATE ALASKA FIELD PRUDHOE BAY UNIT- DATE 10/28/2010 THIS DISTRIBUTION LIST AUTHORIZED BY Alfredo Martinez SO#:3235172 Copies of Copses Digstal Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION(ALASKA)INC I Company DNR-DIVISION OF OIL&GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE,AK 99508 ANCHORAGE,AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON,TX 77002 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By:BAKER ATLAS-PDC 17015 Aldine Westfield,Houston,Texas 77073 This Distribution List Completed By Page 1 of 1 - v m v a a N a 821'17, =I N y moxs os�� m o m mU 3 p C N d D 5:12 C j d j JC T m, m W N N * x N P O d D O nog y O p A V A A smpmms 14 ? i Vm "Nc 3 n m° m g N 9 m Ol v 0 yy .4 0 0 m C N C N x CO mp7c,11mti o W 00obo00 . c G1 u.N NT( 0J N j 0e V V m 66 • p x x 6 0 0 0 N" Z O 00 r r r D =1=1 m 126s,o���� a p "1 �2' ic+ Ofi O 45'511 O o m o Q C• 1, . 0000000000 • ry 0000000 0 r N n I Ul\f1 o p O • HE 1 • MVO ><y De D..Dam n u 7 p • G m ? u 0 g*— -- i.� O nt A• ?. m °—� 216.12> .,a Cc m e s 0 ¢x i3 8m xaAdw S O G H 1 n L ., o ) y -5 0 N T O STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ®Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ❑Suspended 1 b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑Exploratory ❑GINJ ❑WINJ ❑WAG ❑WDSPL ❑Other No.of Completions One ❑Service ❑Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 8/6/2010 210-079 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 7/29/2010 50-029-22232-02-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 8/2/2010 PBU F-47B Ait2880'FNL,2193'FEL, SEC.02,T11N, R13E, UM 8. KB(ft above MSL): 65.31 15.Field/Pool(s): itATop of Productive Horizon: CI. 220'FNL,260'FEL, SEC.02,T11N, R13E, UM GL(ft above MSL): 35.46 Prudhoe Bay Field/Prudhoe Bay total p Depth:LG 9.Plug Back Depth(MD+TVD): Oil Pool FNL, � WL,SEC.01,T11N, R13E, UM 11631' 9048' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 652649 y- 5973934 Zone- ASP4 11648' 9048' ADL 028280 TPI: x- 654589 y- 5973633 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 656361 y- 5973937 Zone- ASP4 N/A N/A 18.Directional Survey: ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD, GR, MEMORY CNL, ROP,WOB,CCL,TNF,TNN 9454' 8829' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE To BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 20" Conductor Weld Surface 110' Surface 110' 30" , 13-3/8" 68# NT-80 31' 3324' 31' 3324' 16" 4082 cu ft AS III.696 cu ft'G'. 145 cu ft AS I 9-5/8" 47# NT-80 29' 9026' 29' , 8584' 12-1/4" 2589 cu ft Class'G' 7-5/8"x 7" 29# NT-95 6006' 8747' 6006' , 8386' 9-5/8"csa Cemented Scab Liner 7" 29# N-80 8747' 9454' 8386' 8829' 8-1/2" 1100 cu ft Class'G' 3-1/Yx3-3/16'x2-718• 9.2#/6.2#16.4# L-80 8895' 11648' 8492' _ 9948' . 4-1/8" 167 Cu ft Class'G' f 24. Open to production or injection? 0 Yes ❑No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) _ PACKER SET(MD/ND) (MD+TVD of Top&Bottom;Perforation Size and Number): 2"Gun Diameter,6 SPF 4-1/2", 12.6#,L-80 8920' 8861'/8468' MD ND MD ND 10110'-10870' 9054'-9054' 11000'-11220' 9055'-9054' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC.11470'-11620' 9050'-9048' t} -iii1PLEi7®! DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED ' #'TI+ Freeze Protected with 45 Bbls of Diesel i► " ,• ' I 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): August 16,2010 Flowing Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 8/17/2010 6 Test Period 4 263 1312 3 95 4998 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 200 900 24-Hour Rate♦ 1050 5249 76 Not Available 28. CORE DATA Conventional Core(s)Acquired? ❑Yes 0 No Sidewall Core(s)Acquired? ❑Yes 0 No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and reseence 4 I, water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory ana es-'0 50.071. None -) 1 3 2010 RBDMS SEP 14 201W4/ P CEA a Cfr,I111iSSiOR Form 10-407 Revised 12/2009 bs CONTINUED ON REVERSE ubmi�final Only "1,___ ?.2o-lc.) �,/:D �� G 29. GEOLOGIC MARKERS(List all formations and ma encountered): 30. !RMATION TESTS NAME MD ND Well Tested? ❑Yes 0 No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. 25N/23SB/Zone 2-B 9520' 8865' None 22N/22TS 9620' 8936' 21 N/Zone 2A 9687' 8982' Zone 1B 9773' 9031' Base of Zone 1B 11453' 9051' Formation at Total Depth(Name): lvishak/Base of Zone 1B 11648' 9048' 31.List of Attachments: Summary of Daily Drilling Reports and Post Rig Work Summary,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Sondra ' _ Title: Drilling Technologist Date: ( - 13-lb PBU F-47B 210-079 Prepared ByNameINumber. Sondra Stewman, 564-4750 Well Number Permit No./Approval No. Drilling Engineer: Cody Hinchman, 564-4468 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only North America -ALASKA- BP Page 1 of 2 Operation Summary Report Common Well Name:F-47 AFE No Event Type:MOBILIZATION(MOB) Start Date:7/24/2010 End Date: 7/25/2010 X3-00W34-C(583,237.00) Project: Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: Rig Release:8/6/2010 Rig Contractor: NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00 @65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/24/2010 02:30 - 03:00 0.50 MOB P PRE CONTINUE TO SECURE EQUIPMENT AND RD 03:00 - 03:25 0.42 MOB P PRE PJSM WITH CREWS AND SECURITY FOR RIG MOVE 03:25 - 04:20 0.92 MOB P PRE JACK UP AND PULL OFF OF D-11 B. CONTINUE DOWN PAD WHILE TOOL SERVICES GET RIG MATS PU FOR USE ON F-47. PULL OFF OF PAD. 04:20 - 05:25 1.08 MOB N HMAN PRE TOUR.PUSHER CALLED COMPANY MAN TO COME TO RIG. COMPANY MAN WAS NOTIFIED THAT THE RIG HAD HITA PIPE LINE WHILE PULLING OFF THE PAD AND ONTO THE PAD ACCESS ROAD.RIG WAS SHUT DOWN ON A LEVEL SAFE STOPPING AREA THAT WOULD ALLOW FOR TRAFFIC TO COME AND GO OFF THE PAD. DAY WSL,AND FIELD SUPERINTENDENT, AND FIELD HSE ADVISOR WAS NOTIFIED PAD OPERATOR WAS CALLED OUT AND THE PIPE LINE WAS IDENTIFIED AS DEPRESSURIZED AND NOT IN USE GAS PIPE LINE,OTL FOR THE AREA WAS NOTIFIED AND RIG WAS TOLD TO PROCEED WITH THE MOVE TO F PAD. TOUR PUSHER NOTIFIED TOWER PUSHER AND SECURITY. 05:25 - 06:00 0.58 MOB P PRE CONTINUE TO MOVE RIG DOWN THE D PAD ACCESS ROAD TOWARDS THE SPINE ROAD 06:00 - 06:30 0.50 MOB P PRE CREW CHANGE AND PJSM 06:30 - 09:00 2.50 MOB P PRE CONTINUE TO MOBALIZE RIG DOWN SPINE ROAD TO F PAD ACCESS ROAD 09:00 - 10:30 1.50 MOB P PRE PULL ONTO F PAD AND PREP F-47.SPOT IN RIG OVER F-47 10:30 - 14:30 4.00 RIGU P PRE ND TREE CAP AND NU BOP'S,DRIP PAN,AND GREASE VALVES CONTINUE TO SPOT IN MISC RIG EQUIPMENT 14:30 - 22:00 7.50 RIGU P PRE TEST BOPE PER AOGCC REGULATIONS, PPRMiT TO DRILL#210079,AND WELL PLAN. Boe TEST BOP'S TO 250 PSI LOW AND 3500 PSI /gt' HIGH.TESTED ANNULAR PREVENTER TO 250 PSI LOW AND 2500 PSI HIGH.TEST WITNESS WAS WAIVED BY JOHN CRISP,OF AOGCC 22:00 - 23:00 1.00 RIGU P PRE PU INJECTOR AND CT CUTTER.CUT 50 FT OF COIL OFF FOR CHROME MANAGMENT. STAND BACK INJECTOR OVER BUNG HOLE AND CIRCULATE IN KCL TO FILL COIL 23:00 - 00:00 1.00 RIGU P PRE PJSM/LOAD AND AND RU,PT TO 250/3500 PSI VALVE CREW LUBRICATOR. 7/25/2010 00:00 - 01:00 1.00 BOPSUR P PRE PT LUBRICATOR TO 250 PSI LOW AND 3500 PSI HIG PU 2 WAY CHECK FROM PROFILE WELL IS ON A SMALL VAC. RD AND SEND OUT LUBRICATOR AND TOOLS. Printed 9/9/2010 4:06.04PM North America -ALASKA- BP Page 2 of 2 Operation Summary Report Common Well Name:F-47 AFE No Event Type:MOBILIZATION(MOB) Start Date:7/24/2010 End Date: 7/25/2010 X3-00W34-C(583,237.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: Rig Release:8/6/2010 Rig Contractor:NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00 @65.3ft(above Mean Sea Level) _ Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:00 - 02:15 1.25 BOPSUR P PRE STAB ON AND CONTINUE TO CIRC AIR OUT OF COIL AT HIGHER RATE PT PACK OFFS AND INNER REEL VALVE-250 PSI LOW AND 3500 PSI HIGH PER AOGCC REGS. 02:15 - 02:15 0.00 BOPSUR P PRE SEE 7/24/2010 F-47 B RON REPORT FOR FURTHER. Printed 9/9/2010 4:06:04PM North America -ALASKA- BP Page 1 of 8 Operation Summary Report Common Well Name:F-47 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/25/2010 End Date: 8/2/2010 X3-00W34-C(1,449,838.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time: Rig Release:8/6/2010 Rig Contractor:NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00©65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/25/2010 02:00 - 02:15 0.25 PULL P DECOMP PJSM FOR MU OF BOT CTC 02:15 - 02:50 0.58 PULL P DECOMP MU BOT CTC AND PULL TEST TO 40 K AND PRESSURE TEST TO 3500 PSI 02:50 - 03:30 0.67 PULL P DECOMP WELL IS ON SMALL VAC THAT WENT AWAY 03:30 - 03:40 0.17 PULL P DECOMP PJSM FOR PU OF FISHING BHA-DISCUSS WELL CONTROL PLANS 03:40 - 04:10 0.50 PULL P DECOMP MU LINER FISHING BHA WITH 4"SEALABLE GS SPEAR,STAB ON,AND ESTABLISH 1 FOR 1 TOOK 3 BBLS TO STABILIZE 04:10 - 05:55 1.75 PULL P DECOMP RIH WITH BHA#1 TAKING RETURNS TO THE TIGER TANK TILL DIESEL FP IS ALL DISPLACED OUT. STARTED TO TAKE GASSY RETURNS AT 6500 FT AND 85 BBLS OUT LINE UP THROUGH SUPPER CHOKE AND TRY TO ESTABLISH 1 FOR 1. CONTINUE TO RIH TO 8752 FT AND STOP WHILE CIRCULATING OUT GAS 05:55 - 06:10 0.25 PULL P DECOMP 1.6 BPM IN AND 94 BBLS IN WITH SUPER CHOKE CLOSSED 200 PSI ON SHUT IN PRESSURE. 06:10 - 07:30 1.33 PULL P DECOMP LEAVE WELL CLOSED WHILE COMPLETING CREW CHANGE AND PJSM'S 07:30 - 09:30 2.00 PULL P DECOMP INCREASE PUMP RATE TO 2.0 BPM AND RESUME CIRCULATING WELL. WAIT FOR ADDITIONAL TRUCKLOAD OF KCL. 09:30 - 10:50 1.33 PULL P DECOMP BEGIN FILLING PITS WITH KCL. WT CK AT 8800'=27.5K DOWN AND 38.5K UP CONFIRM FISH ON WITH WT OF 41.5K UP. STACK 5K DOWN WT AND CIRCULATE BOTTOMS UP THROUGH CUT LINER 10:50 - 13:00 2.17 PULL P DECOMP CIRCULATE GAS BUBBLE OUT FROM LINER. CALL FOR RECONDITIONED GEO-VIS MUD SYSTEM AND CONTINUE CIRCULATING AT 2.0 BPM 13:00 - 15:30 2.50 PULL P DECOMP RECONDITIONED MUD SYSTEM ON LOCATION,BEGIN SWAPPING 15:30 - 15:45 0.25 PULL P DECOMP MUD SWAP COMPLETED. PJSM FOR TRIP OUT OF HOLE WITH NORDIC DRILLER AND CTD DRILLER. PUMP ACROSS THE TOP WITH—300 PSI OF PRESSURE. 15:45 - 18:00 2.25 PULL P DECOMP POOH WITH FISH 18:00 - 18:30 0.50 PULL P DECOMP OOH,FLOW CHECK WELL,CREW CHANGE 18:30 - 19:30 1.00 PULL P DECOMP RU TO LD LINER 19:30 - 19:50 0.33 PULL P DECOMP FILL HOLE WITH 3 BBLS PJSM FOR LD OF LINER 19:50 - 23:00 3.17 PULL P DECOMP UNSTAB INJECTOR AND LD FISHING TOOLS PULL 1 JOINT 2-7/8 FLS4 TUBING PULL 22 FULL JOINTS OF 2-7/8 STL TUBING AND 1 PARTIAL CUT JOINT 23:00 - 00:00 1.00 PULL P DECOMP RD FROM FISHING AND SEND OUT FISHING TOOLS BRING IN PDS TOOLS 7/26/2010 00:00 - 01:15 1.25 EVAL P DECOMP MU PDS MEMORY LOG TOOLS TO COIL STAB ON -TOOLS POWERED UP @ 00:43 Printed 9/9/2010 4:06:31 PM North America -ALASKA- BP Page 2 of 8 Operation Summary Report Common Well Name:F-47 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/25/2010 End Date:8/2/2010 X3-00W34-C(1,449,838.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: Rig Release: 8/6/2010 Rig Contractor:NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00 @65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:15 - 03:15 2.00 EVAL P -_ DECOMP RIH WITH PDS CALIPER/BHA#2 PVT=272 BBLS 03:15 - 03:30 0.25 EVAL P DECOMP GET WT CHECK OF 37 K UP AND 25 K RIH WT EASE INTO BOTTOM LOOKING FOR SMALL TAG STOP RIH AT 9532 FT WITHOUT ANY NOTICABLE TAG. PVT=327 BBLS 03:30 - 04:03 0.55 EVAL P -_ DECOMP WAIT ON CALIPER TOOL TO OPEN AND START LOGGING 04:03 - 04:30 0.45 EVAL P DECOMP LOG UP AT 50 FT/MIN PVT ON BOTTOM=327 BBLS LOG UP FROM 9352 FT TO 8650 FT STOP AND WAIT 5 MIN FOR CALIPER ARMS TO RETRACT 04:30 - 06:05 1.58 EVAL P ® DECOMP POOH WITH BHA#2 PVT .■8650 FT=321 BBLS 06:05 - 06:30 0.42 EVAL P ® DECOMP OOH,PJSM AND PREP TO LAY DOWN PDS LOGGING BHA. 06:30 - 07:00 0.50 EVAL P DECOMP LD PDS LOGGING BHA. 1 LOWER CENTRALISER ARM MISSING. DIMENSIONS OF LOWER CENTRALISER ARM: OAL=17",W 1/2", H=1"(ARM ALSO HAS ARTICULATING PIVOT POINT IN CENTER). SEND LOGGING DATA TO HOUSTON FOR PROCESSING. 07:00 - 12:00 5.00 EVAL P DECOMP WAIT ON DATA FROM PDS CALIPER LOG TO HELP DETERMINE NEXT RUN. 12:00 - 12:30 0.50 EVAL P DECOMP RECIEVE PDS DATA. DISCUSS PLAN FORWARD WITH TOWN ENGINEER. 12:30 - 16:45 4.25 EVAL P DECOMP PLAN TO DRIFT TUBING AND LINER WITH DUMMY WHIPSTOCK. BEGIN COIL SLACK MANAGEMENT AND PREP TO MU BAKER CONNECTOR. REVERSE CIRCULATE THROUGH COIL FOR ELINE SLACK MANAGEMENT. CUT 250'OF COIL. MU CTC AND PULL TEST TO 35K. PUMP FORWARD AT 3.3BPM. POP OFF WELL AND FIND ELINE. MU BHI UQC. MEG WIRE AND PERFORM SHUNT TEST. BOTH TESTS WERE GOOD. PT UQC TO 1K AND 4K. 16:45 17:00 0.25 CLEAN P ■- WEXIT PJSM WITH RIG CREW BEFORE MAKING UP DRIFT BHA WITH DUMMY WHIPSTTOCK KAND BI-DIRECTIONAL JAR. 17:00 - 17:30 0.50 CLEAN P WEXIT MU DRIFT BHA 17:30 - 20:15 2.75 CLEAN P WEXIT RIH WITH 3.625"DRIFT BHA. MADE MULTAPLE WT CHECKS WHILE DRIFTING IN HOLE TO TAG AT 9530 FT UNCORECTED. CLEAN DRIFT RUN 20:15 - 21:25 1.17 CLEAN P WEXIT PU AND LOG FOR GR TIE IN AT 9070 FT MADE-4 FT CORRECTION MAKE CCL LOG FROM 9200 FT TO 9522 FT WITH LIGHT TAG AT 9,525 FT ELMD 21:25 - 23:45 2.33 CLEAN P -_ WEXIT POOH WITH DRIFT BHA-CLEAN PVT=327 BBLS 23:45 - 00:00 0.25 CLEAN P WEXIT PJSM ON BHA CHANGE 7/27/2010 00:00 - 01:30 1.50 WHIP P WEXIT MU WHIPSTOCK SETTING BHA STAB ON INJECTOR AND TEST TOOLS,OPEN EDC Printed 9/9/2010 4:06:31 PM " North America -ALASKA- BP Page 3 of 8 Operation Summary Report Common Well Name: F-47 (AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date:7/25/2010 End Date:8/2/2010 X3-00W34-C(1,449,838.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time: Rig Release: 8/6/2010 Rig Contractor:NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00 @65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:30 - 03:30 2.00 WHIP P WEXIT RIH WITH BHA#4-WHIPSTOCK SETTING BHA 03:30 - 04:10 0.67 WHIP P WEXIT LOG FOR GR TIE IN FROM 9070 FT TO 9120 FT MADE A-7 FT CORRECTION 04:10 - 04:30 0.33 WHIP P WEXIT RIH TO SET TOP OF WHIPSTOCK AT 9450 FT. PU TO BREAK OVER WEIGHT,CLOSE EDC, AND ZERO DH WOB. PRESSURE UP TO 4200 PSI AND SHEAR OFF, WITH ASSOCIATED DH WOB INCREASE. TAKE OFF INJECTOR BREAK AND EASE IN HOLE TO 3,500#'S DH WOB. PU FREE. 04:30 - 06:05 1.58 WHIP P WEXIT POOH WITH,SETTING TOOLS PVT=327 BBLS 06:05 - 06:15 0.17 WHIP P WEXIT TAG UP AND FLOW CHECK WELL/PJSM FOR BHA SWAP OUT 06:15 - 06:40 0.42 WHIP P WEXIT LD WHIPSTOCK RUNNING BHA-BHA#4 INDICATION OF GOOD/NORMAL SET. 06:40 - 09:00 2.33 STWHIP P WEXIT MU BHA#5-WINDOW MILLING BHA. WITHOUT CENTRALIZER 09:00 - 11:00 2.00 STWHIP P WEXIT INVESTIGATE PROBLEMS WITH INJECTOR AND ERRATIC COIL WEIGHTS. CALL FOR SLB MECHANIC AND INSPECT HYDRAULIC SYSTEM. NO PROBLEMS WTIH P4 HYDRAULIC SYSTEM NOTED BY SLB MECHANIC. CONTINUE RUNNING IN HOLE TO TIE IN DEPTH. 11:00 - 11:15 0.25 STWHIP P WEXIT LOG TIE IN FROM 9120'. CORRECT-2.5'. 11:15 - 23:00 11.75 STWHIP P WEXIT BEGIN MILLING WINDOW FROM 9454'. 2.47 BPM AT 2580 PSI. 9455.2'=2.47/2.54 BPM 2611 PSI 1.04K DHWOB. 9457.0'=2.48/2.53 BPM 2659 PSI 2.98K i ,1j 1/- DHWOB. 9457.5'=2.47/2.53 BPM 2640 PSI 3.28K DHWOB. 9458.1'=2.48/2.53 BPM 2695 PSI 3.91K DHWOB. 9459.1'=2.47/2.52 BPM 2659 PSI 3.86K DHWOB. 9460.1'=2.45/2.50 BPM 2622 PSI 3.93K DHWOB. 9461.2'=2.48/2.53 BPM 2714 PSI 3.42K DHWOB. 23:00 - 00:00 1.00 STWHIP P WEXIT AT 9461.5 FT MOTOR WORK INCREASES TO 400 PSI THEN FALLS OFF TO AROUND 100 PSI. DWOB FALLS OFF TO 2.1 KLBS. 7/28/2010 10:30 - 13:30 3.00 STWHIP N SFAL WEXIT PJSM THEN RIG DOWN BHI CABLE HEAD AND CUT OFF CT CONNECTOR. UNSTAB CT AND SPOOL IT BACK ONTO REEL. SECURE CT STUB AT THE REEL. 13:30 - 17:30 4.00 STWHIP N SFAL WEXIT REMOVE TRACTION MOTOR AND OPEN PIPE SHED DOOR. USE CRANE TO OFFLOAD OLD TRACTION MOTOR AND SET NEW ONE INTO POSITION. CLOSE PIPE SHED DOOR AND INSTALL NEW TRACTION MOTOR. Printed 9/9/2010 4:06:31 PM North America -ALASKA- BP Page 4 of 8 Operation Summary Report Common Well Name:F-47 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/25/2010 End Date:8/2/2010 X3-00W34-C(1,449,838.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time: Rig Release: 8/6/2010 Rig Contractor:NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00 @65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 17:30 - 21:30 4.00 STWHIP N SFAL WEXIT CONTINUE WIRING NEW TRACTION MOTOR. TEST ROTATION AND RE-WIRE IT. FILL WELL WITH 2 BBLS. 21:30 - 22:00 0.50 STWHIP N SFAL WEXIT PJSM FOR PULLING CT ACROSS PIPE SHED AND INTO INJECTOR. 22:00 - 00:00 2.00 STWHIP N SFAL WEXIT PULL CT ACROSS PIPE SHED AND INTO INJECTOR. TEST WIRE,GOOD. INSTALL CT CONNECTOR. PULL TEST TO 35K,GOOD. INSTALL BHI CABLE HEAD AND PT,GOOD. 00:00 - 01:00 1.00 STWHIP P WEXIT CONTINUE TIME MILLING TO 9463.1 FT. 01:00 - 02:55 1.92 STWHIP P WEXIT MILL RATHOLE WITH 3K DWOB. SAMPLE FROM 9463 FT IS 30-40%SAND. MILL TO 9470.3 FT AND SEE A 500 PSI PRESSURE INCREASE(INTERNAL) FOLLOWED BY 200 PSI ANNULAR SPIKE. PULL WT CHECK AND BACKREAM WINDOW. 02:55 - 05:00 2.08 STWHIP P WEXIT PICKUP WT IS 36K OFF BOTTOM. REAM WINDOW. 05:00 - 06:40 1.67 STWHIP P WEXIT MILLED RATHOLE TO 9472'.BACKREAM WINDOW 3 TIMES. DRY DRIFT WINDOW @ 2 FPM. DRIFT WAS CLEAN PUH ABOVE WINDOW AND OPEN EDC. 06:40 - 08:45 2.08 STWHIP P WEXIT POOH. 08:45 - 09:00 0.25 STWHIP P WEXIT PJSM TO LD WINDOW MILLING BHA. 09:00 - 10:00 1.00 STWHIP P WEXIT OOH,BEGIN LD WINDOW MILLING BHA. MILL IS 3.78 NO-GO, REAMER IS 3.79 NO-GO. 10:00 - 10:30 0.50 STWHIP P WEXIT PERFORM LO/TO OF RIG ELECTRICAL SYSTEM WITH HAYDEN AND NORDIC ELECTRICIAN. INSPECTION OF SLB TRACTION MOTOR BY HAYDEN TECH. RECOMMENDATION IS TO REPLACE THE TRACTION MOTOR DUE TO RESISTANCE OF COMMENTATOR ASSEMBLY BEING FAR BELOW SPEC. 7/29/2010 00:00 - 01:00 1.00 DRILL P PROD1 PJSM THEN P/U 1ST DRILLING ASSEMBLY. 2.4 DEG MOTOR WITH REBUILT SRR BIT WITH BUTTONS. BHA OAL=66.08 FT. 01:00 - 02:30 1.50 DRILL P PROD1 TEST TOOL AT SURFACE THEN RIH. 02:30 - 04:00 1.50 DRILL P PROD1 LOG GR FROM 9020 FT TO TIE-IN DEPTH. CORRECT-4 FT. 04:00 - 04:20 0.33 DRILL P PROD1 CONTINUE RIH. WT CHECK JUST ABOVE WINDOW IS 40K. PASS THROUGH WINDOW AT 180L TF,TAG BOTTOM AT 9473 FT. INCREASE PUMP TO 2.5 BPM. 04:20 - 08:50 4.50 DRILL P PROD1 START DRILLLING SLOWLY FROM 9472 FT. HOLD 180L TF FOR NOW TO DROP ANGLE. INITIAL ROP IS 20 FT/HR WITH 1.2K DWOB. 2.54/2.57 BPM @ 2650 PSI FS-2850 PSI. 08:50 - 11:00 2.17 DRILL P PROD1 CONTINUE DRILLING BUILD AT 9555' 2.56/2.59 BPM AT 2754 PSI. PVT=326 BBLS. DHWOB=1.82K ECD=9.93 PPG ROP—10 FPH. Printed 9/9/2010 4:06:31 PM North America -ALASKA- BP Page 5 of 8 Operation Summary Report Common Welt Name:F-47 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/25/2010 End Date: 8/2/2010 X3-00W34-C(1,449,838 00) Project: Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: Rig Release: 8/6/2010 Rig Contractor:NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00©65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 11:25 0.42 DRILL P PROD1 CONTINUE DRILLING BUILD AT 9590' 2.53/2.59 BPM AT 2812 PSI. PVT=324 BBLS. DHWOB=2.42K ECD=9.94 PPG ROP-15-20 FPH. 11:25 - 12:00 0.58 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 9600' 12:00 - 18:10 6.17 DRILL P PROD1 DRILL AHEAD FROM 9600' 2.50/2.38 BPM AT 2545 PSI. PVT=318 BBLS. DHWOB=1.4K ECD=9.91 PPG ROP-20-30 FPH. DRILL TO 9750 FT. 18:10 - 19:30 1.33 DRILL P PROD1 WIPER TRIP TO 8900 FT TO CLEAN 7"CASING SECTION. LARGE AMOUNT OF CUTTINGS SEEN AT THE SHAKER AFTER THIS. 19:30 - 00:00 4.50 DRILL P PROD1 DRILL FROM 9750 FT. HOLD 30L TF FOR NOW TO BUILD ANGLE BACK TO 90 DEG. ROP IS 20 FT/HR WITH 2.4K DWOB. 2.56/2.60 BPM t 2700-3000 PSI. AFTER DRILLING PAST 9755 FT BHA IS PRESSURING UP WHILE OFF BOTTOM, POSSIBLE PLUGGED JETS. DRILL TO 9843 FT WITH MOSTLY LOW ROP, HAVE TO STACK 5-6K DWOB TO DRILL. POOH FOR BIT CHANGE. 7/30/2010 00:00 - 02:30 2.50 DRILL P PROD1 POOH. SOME STATOR RUBBER ACROSS SHAKER WHILE POOH. OPEN EDC AND PUMP 3.2 BPM AFTER PULLING THROUGH WINDOW. PERFORM 500 FT JOG AT SURFACE. 02:30 - 03:20 0.83 DRILL P PROD1 PJSM THEN UD BHA#6. BIT IS 3-1. M/U BHA#7-2.4 DEG MOTOR,REBUILT SRX BIT AND 3"COILTRAK. BHA OAL=66.08 FT 03:20 - 06:30 3.17 DRILL P PROD1 TEST TOOL AT SURFACE THEN RIH. TIE-IN DEPTH FROM 9465 FT. CORRECT-2 FT. 06:30 - 07:00 0.50 DRILL P PROD1 BEGIN MUD SWAP TO NEW POWER-VIS SYSTEM DRILL AHEAD FROM 9844' 2.45/2.51 BPM 2622 PSI PVT=302 BBLS DHWOB=1.16K ECD=10.01 07:00 - 10:30 3.50 DRILL N SFAL PROD1 TROUBLESHOOT MWD FAILURE. DISCOVERED CORRUPTED DEPTH FILE. RE-IMAGE COMPUTER AND RE-LOG TIE-IN. NO CORRECTION NOTED 10:30 - 15:00 4.50 DRILL P PROD1 DRILL AHEAD FROM 9843'. MUD SWAP COMPLETED. 2.37/2.44 BPM 2358 PSL PVT=334 BBLS DHWOB=0.91K ECD=9.67 PPG 15:00 - 17:00 2.00 DRILL P PROD1 POOH FOR LATERAL BHA. CIRCULATE AT MAXIMUM RATE WHILE PULLING UP THROUGH SECTION OF 7"LINER. 17:00 - 18:00 1.00 DRILL P PROD1 TAG STRIPPER AND UD BHA#7. BIT IS 1-1. 18:00 - 18:40 0.67 BOPSUR P PROD1 FUNCTION TEST BOPS. NIGHT SHIFT CONDUCT RIG CHECKS. 18:40 - 18:55 0.25 DRILL P PROD1 PJSM FOR P/U BHA#8. OVERHEAD LOADS AND WELL CONTROL WERE DISCUSSED. Printed 9/9/2010 4:06:31 PM North America -ALASKA- BP Page 6 of 8 Operation Summary Report Common Well Name: F-47 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 7/25/2010 End Date: 8/2/2010 X3-00W34-C(1,449,838.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time: Rig Release:8/6/2010 Rig Contractor:NORDIC CALISTA UWI: Active Datum:5.0:47 12/29/1991 00:00 @65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations hr (ft) 18:55 20:00 1.08 DRILL P ■- PROD1 BICENTER BHA#8. REBUILT DEG O 4-BLADE 3" BICENTER WITH 1.2 DEG MOTOR,3" COILTRAK. 20:00 - 22:10 2.17 DRILL P PROD1 TEST TOOL AT SURFACE AND RIH. WHILE RIH SLB MECHANIC ARRIVES TO INSPECT GRIPPER BLOCKS. SOME MINOR SCRAPES ON THE PIPE WERE FOUND AFTER THE LAST RUN. PASS THROUGH WINDOW AND LOG GR FROM 9470 FT. CORRECT-4 FT. 22:10 - 22:40 0.50 DRILL P PROD1 CONTINUE RIH. 22:40 - DRILL P PROD1 DRILL FROM 10015 FT. HOLD 9OR TF FOR NOW TO CONTINUE RH TURN TO STAY IN POLYGON. INITIAL ROP IS 120 FT/HR WITH 1.8K DWOB. 7/31/2010 00:00 - 01:05 1.08 DRILL P PROD1 CONTINUE DRILLING TO 10150 FT. 01:05 - 02:50 1.75 DRILL P PROD1 WIPER TRIP FROM 10150 FT TO 8900 FT TO CLEAN 7"CASING. CLEAN PASS UP AND DOWN. 02:50 - 03:10 0.33 DRILL P - PROD1 DRILL FROM 10150 FT TO 10178 FT. ROP IS AROUND 100 FT/HR. 03:10 - 06:00 2.83 DRILL P PROD1 DEPTH PROBLEMS,PICK UP AND TROUBLESHOOT. DISCOVER BHI DEPTH ENCODER IS BAD, PULL BACK THROUGH WINDOW TO CHANGE IT OUT. 06:00 - 08:15 2.25 DRILL P PROD1 WIPER TO WINDOW. PUMP MAX RATE THROUGH SECTION OF 7". LOG TIE-IN. RIH TO RESUME DRILLING. 08:15 - 10:45 2.50 DRILL P PROD1 DRILL AHEAD FROM 10300' 2.50/2.52 BPM 2498 PSI PVT=323 BBLS DHWOB=0.76K ECD=9.89 PPG 10:45 - 12:00 1.25 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 10451' 12:00 - 14:00 2.00 DRILL P PROD1 DRILL AHEAD FROM 10451,' 2.47/2.55 BPM 2398 PSI PVT=317 BBLS DHWOB= 1.60K ECD=9.90 PPG. 14:00 - 17:30 3.50 DRILL P -_ PROD1 WIPER TRIP TO WINDOW FROM 10600' TIE-IN DEPTH,CORRECT-2 FT. 17:30 - 18:40 1.17 DRILL P PROD1 DRILL AHEAD FROM 10600' 2.44/2.46 BPM 2659 PSI PVT=307 BBLS DHWOB=0.90K ECD=10.04 ECD. DRILL TO 10750. 18:40 - 21:20 2.67 DRILL P PROD1 WIPER TRIP TO 8900 FT TO CLEAN 7" CASING. TAG BOTTOM OF WINDOW 2 TIMES AT 180L, GET THROUGH ON THE 3RD TRY AT 160L TF, 15 FT/MIN. STACK WT BRIEFLY AT 10100 FT SHALES. Printed 9/9/2010 4:06:31 PM North America -ALASKA- BP Page 7 of 8 Operation Summary Report Common Well Name: F-47 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date:7/25/2010 End Date: 8/2/2010 X3-00W34-C(1,449,838.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 'Rig Release: 8/6/2010 Rig Contractor:NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00©65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:20 - 23:10 1.83 DRILL P PROD1 DRILL FROM 10750 FT. CONTINUE HOLDING 90 DEG INC TO MAINTAIN TVD. ROP IS STEADY 120 FT/HR DROPPING ABRUPTLY,TO 20-40 FT/HR AFTER 10790 FT. (FAULT IS EXPECTED AT THAT DEPTH). 2.54/2.56 BPM @ 2400-2700 PSI. ECD=10.11 PPG. DRILL TO 10877 FT. PVT=300 BBLS. 23:10 - 00:00 0.83 DRILL P PROD1 PULL EARLY WIPER DUE TO BHA PLUGGING OFF. PICK UP SLOWLY AND BHA CLEARS ITSELF. RUBBER ACROSS SHAKER AND IN SHAKER TROUGH. POOH FOR NEW MOTOR. 8/1/2010 00:00 - 02:30 2.50 DRILL P PROM CONTINUE POOH FOR MOTOR CHANGE. PULL THROUGH WINDOW AND OPEN EDC, PUMP 3.2 BPM WHILE POOH. PERFORM 500 FT JOG AT SURFACE. 02:30 - 02:45 0.25 DRILL P PROD1 PJSM FOR L/D BHA. 02:45 - 04:00 1.25 DRILL P PROD1 L/D BHA#8. BIT IS 3-2 WITH ONE PLUGGED JET(RUBBER). • PICK UP BHA#9-USED HYC SRR BIT,NEW 1.2 DEG XTREME,3"COILTRAK. BHA OAL=66.11 FT 04:00 - 05:30 1.50 DRILL P PROD1 TEST TOOL AT SURFACE THEN RIH. AT 9300 FT TRY TO ORIENT TO GET THROUGH WINDOW,ORIENTOR NOT WORKING. REBOOT AND CYCLE POWER TO TOOL,NO LUCK. 05:30 - 06:00 0.50 DRILL N DFAL 9,300.0 PROD1 ATTEMPT TO OPEN EDC TO SWAP MUD. PUMP IS STARTED WHILE EDC IS OPENING, WHICH SHUTS OFF POWER TO TOOL. 06:00 - 08:10 2.17 DRILL N DFAL 9,300.0 PROD1 POOH TO CHANGE HOT 08:10 - 09:00 0.83 DRILL N DFAL 9,300.0 PROD1 OOH,SWAP HOT 09:00 - 11:00 2.00 DRILL N DFAL 9,300.0 PROD1 RIH,TIE-IN(-5'CORRECTION) 11:00 - 12:00 1.00 DRILL P PROD1 CONTINUE RIH TO 10878' 12:00 - 15:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 10878'. BEGIN MUD SWAP 2.61/2.65 BPM 2435 PSI PVT=MUD SWAP. DHWOB=0.13K. ECD= 10.03 PPG 15:00 - 17:00 2.00 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 10956' 17:00 - 18:35 1.58 DRILL P PROD1 DRILL AHEAD FROM 10956'. 2.54/2/52 BPM. 3021 PSI PVT=345 BBLS. DHWOB=2.20K. ECD= 9.96 PPG. DRILL TO 11093 FT. 18:35 - 21:30 2.92 DRILL P PROD1 WIPER TRIP FROM 11093 FT TO 8900 FT TO CLEAN 7"CASING. CLEAN PASS UP AND DOWN. 21:30 - 23:20 1.83 DRILL P PROD1 DRILL FROM 11090 FT. HOLD 90-91 DEG FOR NOW,GEO FOUND TRACE HEAVY OIL IN LAST SAMPLE. ROP IS 120 FT/HR WITH 1.7K DWOB. FREQUENT WT STACKING AND OVERPULLS, DIFFERENTIAL EFFECTS. DRILL TO 11234 FT. Printed 9/9/2010 4:06:31 PM North America -ALASKA- BP Page 8 of 8 Operation Summary Report Common Well Name:F-47 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/25/2010 End Date:8/2/2010 X3-00W34-C(1,449,838.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time: Rig Release: 8/6/2010 Rig Contractor:NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00©65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:20 - 00:00 0.67 DRILL P ■- PROD1 WISER TRIP ENE C ABOVE WINDOW CLEAN 7" CASING. OPEN EDC ABOVE WINDOW AND PUMP 3.2 BPM. 8/2/2010 00:00 - 02:45 2.75 DRILL P PROD1 CONTINUE WIPER TRIP AND TIE-IN LOG. ■ TIE-IN DEPTH FROM 9475 FT,CORRECT+5 FT. 02:45 - 06:15 3.50 DRILL P PROD1 DRILL FROM 11234 FT. CONTINUE HOLDING 91 DEG INC. PVT=324 BBLS. ECD=10.05 PPG. 2.55/2.59 BPM @ 2500-2900 PSI. ROP IS 100-120 FT/HR WITH 1-2 KLBS DWOB. AFTER 11270 FT ROP ERRATIC WITH POOR WT TRANSFER,SHALE ZONE FROM 11270 FT ONWARDS. 06:15 - 08:00 1.75 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 11400'. 08:00 - 13:30 5.50 DRILL P PROD1 P: _. :• :•u 'I I' HOLDING 95 DEG INC IN ATTEMPT TO EXIT SHALE. 2.49/2.54 BPM. 2545 PSI PVT=309 BBLS. DHWOB=2.31K ECD= 10.07 PPG 13:30 - 16:00 2.50 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 11566' PUMP ■ AT MAX RATE THROUGH 7"LINER. TIE-IN AND CORRECT+5'. 16:00 - 17:30 1.50 DRILL P PROD1 DRILL AHEAD FROM 11566' 2.54/2.61 BPM. 2933 PSI. PVT=307 BBLS. DHWOB=1.74K ECD= '51D 10.25 PPG DRILL TO TD OF 11650 FT REACHED THE END OF THE POLYGON. 17:30 20:00 2.50 DRILL P PROD1 WIPER TRIP.CLEAN UP SHALE ZONES AT THE END OF THE WELL TWO TIMES. PULL BACK TO 8900 FT AND JET 7"CASING WITH OPEN EDC. 20:00 - 21:35 1.58 DRILL P ■- PROD1 RLOG GR FROM 9475 FT TO IH, CORRECT BOTTOM AT FT. IN DEPTH. 21:35 - 00:00 2.42 DRILL P PROD1 POOH, LAY IN LINER PILL 1:1. SLIGHT OVERPULLS 2-5K GOING THROUGH SHALE ZONES. AFTER LINER PILL IS OUT GO BACK TO FULL PUMP RATE. PULL THROUGH WINDOW AND OPEN EDC. PAINT FLAGS AT 8584,6400 FT EOP WHILE POOH. LOG CCL ACROSS END OF TUBING TO CONFIRM NIPPLE DEPTHS. Printed 9/9/2010 4:06:31 PM North America -ALASKA- BP Page 1 of 5 Operation Summary Report Common Well Name:F-47 AFE No Event Type: COM-ONSHORE(CON) Start Date:8/3/2010 End Date:8/6/2010 X3-00W34-C(1,016,083.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time: Rig Release: 8/6/2010 Rig Contractor:NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00 @65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/3/2010 00:00 - 00:30 0.50 CASING P RUNPRD CONTINUE POOH WITH FINAL DRILLING BHA AFTER TD OF WELL. 00:30 - 01:30 1.00 CASING P RUNPRD PJSM THEN L/D BHA#10. BIT IS 3-1. 01:30 - 02:20 0.83 CASING P RUNPRD REMOVE BHI CABLE HEAD. INSTALL BOOT ON END OF CT. M/U 2 JOINTS PH6 AND GET ON WELL,PUMP ALL SLACK OUT OF CT. CUT 190 FT OF CABLE OFF. 02:20 - 03:00 0.67 CASING P RUNPRD LOAD BTT TOOLS ONTO RIG. INSTALL BTT CONNECTOR,PULL TEST TO 35K GOOD. PT TO 3500 PSI,GOOD. SET INJECTOR DOWN ON LEGS. 03:00 - 03:20 0.33 CASING P RUNPRD PJSM FOR P/U LINER. WELL CONTROL AND OVERHEAD LOADS WERE DISCUSSED. 03:20 - 11:00 7.67 CASING P RUNPRD M/U LINER AS PER PROGRAM-72 JTS 2-7/8, 15 JTS 3-1/2 AND RUNNING TOOLS. BHA OAL=2948.50 FT. FILL LINER WITH WATER AFTER 2-7/8". CONTINUE MAKING UP 3-1/2". CONDUCT KICK WHILE MAKING UP LINER DRILL WITH 3-1/2"LINER ACROSS BOP STACK. PUMP 3/4" BALL FOR DRIFT OF COIL. 11:00 - 11:30 0.50 CASING P RUNPRD FILL LINER. 11:30 - 12:45 1.25 CASING P RUNPRD RIH WITH LINER(BHA#11).CIRCULATE 0.3BPM/1600PSI. 12:45 - 13:35 0.83 CASING P RUNPRD WT CK AT WINDOW,43K PUW&29K RIW. CORRECT TO FLAG.RIH THROUGH OPEN HOLE SECTION AT 50FT/MIN,CIR 0.3BPM/1600PSI.OH SECTION WAS CLEAN. TAG BOTTOM AT 11641 FT.PUW=49K. REPEAT W/SAME RESULTS.REPEAT WITHOUT PUMPS,SAME RESULTS. 13:35 - 14:15 0.67 CASING P RUNPRD LAUNCH 5/8"STEEL BALL.CIRCULATE 2BPM/2400PSI.BALL LANDED AT 39BBLS, SHEARED AT 4400PS1.PUH 38K,LINER HAS BEEN RELEASED. 14:15 - 17:00 2.75 CASING P RUNPRD SWAP WELL TO DOUBLE SLICK 2%KCL AT 2.15BPW2000PSI AT 1:1.SIMULTANEOUSLY, SPOT&RU SLB CEMENTERS. 1.5BPM/480PSI. 17:00 - 17:15 0.25 CASING P RUNPRD PJSM REGARDING PUMPING CEMENT. 17:15 - 17:50 0.58 CASING P RUNPRD PRIME UP&BATCH UP SLB CEMENT TRUCK. CEMENT AT WEIGHT AT 17:30.SEND SAMPLE TO SLB LAB.FLOOD CEMENT LINES WITH DS 2%KCL.PRESSURE TEST LINES TO 250PSV3500PSI. 17:50 - 18:15 0.42 CASING P RUNPRD PUMP 31.6BBLS OF 15.8PPG CLASS'G' CEMENT AT 1.5BPM. 5BBLS AWAY 750PSI 1 OBBLS AWAY 980PSI 15BBLS AWAY 1225PSI 2OBBLS AWAY 1475PSI 25BBLS AWAY 1340PSI 3OBBLS AWAY 1205PS1 Printed 9/9/2010 4:37:00PM North America -ALASKA- BP Page 2 of 5 Operation Summary Report Common Well Name:F-47 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/3/2010 End Date: 8/6/2010 X3-00W34-C(1,016,083.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: Rig Release:8/6/2010 Rig Contractor: NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00 @65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:15 - 19:15 1.00 CASING P RUNPRD DISPLACE CEMENT WITH 110BBLS OF DS 2% KCL W/2PPB BIOZAN AT 2.5BPM/1800PSI. STOP&PU&EXHAUST 5BBLS OF FLUID. LAUNCH&DISPLACE LWP TO LATCH COLLAR AT 1.5BPM.LWP LANDED&FLOATS HELD. 30BBLS OF CEMENT ON THE BACKSIDE. 19:15 - 19:45 0.50 CASING P RUNPRD POOH REPLACING VOIDAGE PLUS 0.5BPM 19:45 - 20:00 0.25 CASING P RUNPRD PJSM TO LD CEMENTING BHA AND PU MCNL LOGGING BHA 20:00 - 20:45 0.75 CASING P RUNPRD CONTINUE POOH. 20:45 - 21:30 0.75 CASING P RUNPRD TAG STRIPPER AND LD LNR RUNNING TOOLS.TOOLS FUNCTIONED NORMALLY AND 5/8"BALL RECOVERED.OFLOAD BTT TOOLS. 21:30 - 22:30 1.00 CASING P RUNPRD PREP RIG FLOOR TO RUN CSH AND LOAD CNL TOOLS TO RIG FLOOR. 22:30 - 22:45 0.25 EVAL P OTHCMP PJSM TO HANDLE LOGGING SOURCES. 22:45 - 23:15 0.50 EVAL P OTHCMP MU MCNL BHA., 2-1/8"BAKER MOTOR,2.3"MILL,1STAND CSH,MCNL,1/2"CIRC SUB,5/8"DISC.,47 STANDS CSH,3/4"DISC.,DBPV,4JTS PH6. BHA OAL=3144.17' 23:15 - 23:25 0.17 EVAL P OTHCMP KICK WHILE TRIP DRILL,GOOD RESPONSE BY CREWS. 23:25 - 00:00 0.58 EVAL P OTHCMP CONTINUE MU BHA 12 8/4/2010 00:00 - 01:45 1.75 EVAL P OTHCMP CONTINUE TO MU BHA 12 PUMP 10 BBLS TO VERIFY CSH CLEAR 01:45 - 03:00 1.25 EVAL P OTHCMP RIH WITH LOGGING BHA(BHA#12). CIRCULATE MIN RATE 0.25BPM/800PSI. CEMENT IS AT 1000PSI CS AT 3AM. 03:00 - 05:00 2.00 EVAL P OTHCMP LOGGING DOWN 30 FPH FROM 8600'.TOL IS CLEAR. 05:00 - 05:50 0.83 EVAL P OTHCMP TAGGED TD AT 11,633'UNCORRECTED.LOG UP AT 60FPM WHILE LAYING IN 28BBLS 150K LSRV 8.6PPG PERF PILL W/2%LO TORQ. DIVERT-50BBLS OF 8.7PPG CEMENT LAIDEN FLUIDS TO CUTTINGS BOX,TREAT SAME. 05:50 - 07:00 1.17 EVAL P OTHCMP POH. 07:00 - 07:35 0.58 EVAL P OTHCMP PJSM REGARDING HANDLING LOGGING BHA. 07:35 - 12:15 4.67 EVAL P OTHCMP POP OFF WELL.PLACE INJECTOR OVER BUNG HOLE.LD 4 JTS OF 2-3/8"PH6 TUBING. DROP 1/2"BALL&OPEN CIRC SUB.LD 50 JTS OF 1-1/4"CSH.STAND BACK 23 STNDS OF 1-1/4"CSH. 12:15 - 12:30 0.25 EVAL P OTHCMP PJSM REGARDING HANDLING RADIOACTIVE SOURCE. 12:30 - 13:15 0.75 EVAL P OTHCMP LD 2 SINGLE JTS OF CSH.RECOVER 1/2" BALL.REMOVE SOURCE.OFF LOAD SLB TOOLS&DOWN LOAD DATA.LD MOTOR& MILL. 13:15 - 13:40 0.42 EVAL P OTHCMP MU SWIZZLE STICK BHA.STAB ONTO WELL. CEMENT IS AT 1835PSI CS. 13:40 - 14:45 1.08 EVAL P OTHCMP JET STACK&DEAD LEGS. 14:45 - 15:00 0.25 EVAL P OTHCMP POP OFF WELL.LD SWIZZLE STICK BHA. Printed 9/9/2010 4.37:OOPM North America -ALASKA- BP Page 3 of 5 Operation Summary Report Common Well Name:F-47 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/3/2010 End Date: 8/6/2010 X3-00W34-C(1,016,083.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time: Rig Release:8/6/2010 Rig Contractor: NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00 @65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 16:16 1.27 EVAL P OTHCMP PRESSURE TEST LINER LAP TO 2000PS1. FIRST ATTEMPT FLAT LINED AT 1840PSI IN 5 MIN. PRESSURE UP&RETEST TO 2030PSI. INITIAL 2030PS1 I5MIN 1893PS1 30MIN 1827PSI(SHOWING 7T LINE STABALIZATION) LINER LAP TEST-PASS 16:16 - 16:45 0.48 PERFOB P OTHCMP PREP RIG FLOOR TO RUN GUNS. 16:45 - 17:00 0.25 PERFOB P OTHCMP PJSM REGARDING MU PERF GUN BHA. 17:00 - 21:15 4.25 PERFOB P OTHCMP MU PERF BHA.BHA#13=1535'OF 6SPF 2.00" 2006PJ GUNS, E-FIRE HEAD,5/8"HYD DISC., 21 STANDS 1-1/4"CSH,3/4"HYD DISC., DBPV, 4JTS 2-3/8"PH6,SWIVEL. BHA OAL=2981.59' 21:15 - 23:00 1.75 PERFOB P OTHCMP RIH BHA#13, PUMP 0.3 BPM, 120PSI 23:00 - 23:15 0.25 PERFOB P OTHCMP TAG AT 11,631'PU TO GET WT BACK AND CORRECT DEPTH TO 11,630.7'. ESTABLISH PUMP RATE AND PRESURES FOR FIRING GUNS. LINE UP RETURN FLOW THRU MANUAL CHOKE. 23:15 - 23:30 0.25 PERFOB P OTHCMP PARKED AT 11,622'TO GO THRU PUMP SEQUENCE.PUMP SEQUENCE TO FIRE GUNS.FIRED GUNS WHILE MOVING UP HOLE. GOOD INDICATION GUNS FIRED FROM ACOUSTIC,OVERPULL AND FLUID LOSSES. PERFORATED INTERVALS 10,110'-10,870 AND 11,000-11,220 AND 11,470'-11,620'USING 2" / 6SPF 2006PJ PERF GUNS. 23:30 - 00:00 0.50 PERFOB P OTHCMP POOH AT 60FPM HOLDING 300-400PSI BACK PRESSURE WITH CHOKE WHILE GUNS ARE INSIDE LINER. 8/5/2010 00:00 - 00:10 0.17 PERFOB P OTHCMP CONTINUE POOH AT 60FPM HOLDING 300-400PSI BACK PRESSURE WITH CHOKE WHILE GUNS ARE INSIDE LINER. 00:10 - 00:40 0.50 PERFOB P OTHCMP STOP COIL AT 8850',SHUT DOWN PUMPS OPEN CHOKE FULLY AND FLOW CHECK WELL.NO FLOW. 00:40 - 01:00 0.33 PERFOB P OTHCMP FILL WELL WITH 0.9 BBLS AND POOH. 01:00 - 01:20 0.33 PERFOB P OTHCMP H2S EVACUATION DRILL.ALL PERSONS MUSTERED IN SATELITE OFFICE IN 2 MINUTES.AAR HELD AND DISCUSSED LL WITH CREW. 01:20 - 02:00 0.67 PERFOB P OTHCMP CONTINUE TO POOH AT 95FPM PUMPING 1.1 BPM. 02:00 - 02:30 0.50 PERFOB P OTHCMP TAG STRIPPER START FLOW CHECK.NO FLOW.PJSM TO LD CSH. 02:30 - 02:40 0.17 PERFOB P OTHCMP FILL WELL WITH 0.8 BBLS AND POP OFF WELL. 02:40 - 04:00 1.33 PERFOB P OTHCMP LD 4 JTS PH6 THEN CSH. 04:00 - 04:15 0.25 PERFOB P OTHCMP PJSM TO LD PERF GUNS. 04:15 - 05:50 1.58 PERFOB P OTHCMP LD PERF GUNS. 05:50 - 06:30 0.67 PERFOB P OTHCMP STOP&CLEAN RF.C/O WITH DAY CREW. PERFORM WALK AROUNDS. Printed 9/9/2010 4:37:00PM North America -ALASKA- BP Page 4 of 5 Operation Summary Report Common Well Name: F-47 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/3/2010 End Date:8/6/2010 X3-00W34-C(1,016,083.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: Rig Release: 8/6/2010 Rig Contractor:NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00 @65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:30 - 07:10 0.67 PERFOB P OTHCMP LOAD COIL WITH 45BBLS OF DIESEL FOR FREEZE PROTECT. SIMULTANEOUSLY ORGANIZE THE PIPE SHED. FILL WELL- TAKING FLUID 07:10 - 09:40 2.50 PERFOB P -_ OTHCMP CONTINUE TO LD PERF GUNS.ALL SHOTS FIRED. 09:40 - 11:00 1.33 PERFOB P ■- OTHCMP CLEAN RF.LOWER DOWN SLB EQUIPMENT TO GROUND.REMOVE PERF GUNS FROM PIPESHED. 11:00 - 12:15 1.25 DHEQP C OTHCMP DUE TO QUESTIONABLE LINER LAP PRESSURE TEST,THE DECISION TO SET A KB LINER TOP PACKER WAS MADE TO RETEST LINER LAP. PU INJECTOR&STAB ONTO WELL.FLUSH DIESEL FROM COIL WITH DS 2%KCL. 12:15 - 12:30 0.25 DHEQP C OTHCMP PJSM REGARDING MU KB LTP. 12:30 - 13:15 0.75 DHEQP C OTHCMP MU KB LT PACKER. 13:15 - 15:15 2.00 DHEQP C OTHCMP RIH WITH KB LTP(BHA#14).CIRCULATE 0.5BPM/146PSI.RECOVERED LOTS OF PERF GUN DEBRIS WHILE RIH-8OBBLS DIVERTED TO THE CUTTINGS BOX. WT CK AT 8850FT,RIW=28K,PUW=41 K. WITH 0.5BPM/100PSI,STING INTO LINER TOP AT 8893FT.STOP PUMPING&NO-GO OUT AT 8900FT.STACK 10K DOWN. 15:15 - 16:30 1.25 DHEQP C OTHCMP FLUID PACK BACKSIDE.PRESSURE TEST BACKSIDE TO 2600PSI FOR 30MIN. 50PSI LOST IN FIRST 15MIN 20PSI LOST IN SECOND 15MIN(12MIN OF FLAT LINE)PASS BLEED OFF BACKSIDE 16:30 - 18:15 1.75 DHEQP C ®- OTHCMP POH PUMP 1.1 BPM/280PSI. 18:15 - 19:15 1.00 RIGD C PRE PJSM TO LD BHA 14 AND MU BHA 15. 19:15 - 19:30 0.25 RIGD P ■- PRE AND BHA N AND TAG BHA 15.NOZZLE,AND POP OFF STINGER.TAG STRIPPER AND POP OFF WELL. 19:30 - 19:45 0.25 RIGD P PRE STAB INJECTOR ON WELL AND RIH TO 2,500'. 19:45 - 20:00 0.25 RIGD P -_ PRE PJSM TO RU AND PUMP 45BBLS DIESEL FREEZE PROTECT. 20:00 - 21:30 1.50 BOPSUR P -_ PRE PUMPING FREEZE PROTECT FROM 2,500'TO SURFACE.POH LAYING IN DIESEL 1 FOR 1. 21:30 - 21:45 0.25 BOPSUR P PRE PJSM TO GREASE TREE AND SET TWC. 21:45 - 22:00 0.25 BOPSUR P PRE GREASE TREE VALVES AND SET TWC. 22:00 - 22:15 0.25 RIGD P PRE PJSM TO PUMP N2 22:15 - 22:50 0.58 RIGD P PRE RU N2 UNIT. 22:50 - 23:30 0.67 RIGD N SFAL PRE SLB TRIPLEX PUMP DOWN.MECHANIC CALLED.HYDRAULIC OVERPRESSURE SWITCH TRIPPED.ONCE PROBLEM FOUND THEY RESET SWITCH AND STARTED PUMPING. 23:30 - 23:45 0.25 RIGD P PRE SLB PUMPING N2. 23:45 - 00:00 0.25 RIGD P PRE BLOWING DOWN REEL WITH N2. 8/6/2010 00:00 - 00:30 0.50 RIGD P PRE CONTINUE TO BLOWDOWN REEL. 00:30 - 01:00 0.50 RIGD P -_ PRE POP OFF WELL.CUT COIL. INSTALL INTERNAL GRAPLE.PULL TEST. Printed 9/9/2010 4:37:00PM North America -ALASKA- BP Page 5 of 5 Operation Summary Report Common Well Name:F-47 AFE No Event Type: COM-ONSHORE(CON) Start Date:8/3/2010 End Date: 8/6/2010 X3-00W34-C(1,016,083.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time: Rig Release:8/6/2010 Rig Contractor:NORDIC CALISTA UWI: Active Datum:50:47 12/29/1991 00:00 @65.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:00 - 02:30 1.50 RIGD P PRE PULL COIL ACROSS AND SECURE TO SHIPPING REEL. 02:30 - 04:00 1.50 RIGD P PRE OPEN ALL BOP DOORS AND CLEAN CAVITIES.SWAP RAMS TO DESIRED SIZE FOR NEXT WELL.BREAK DOWN THE INNER REEL HARDLINES FOR REEL SWAP. 04:00 - 05:30 1.50 RIGD P PRE NIPPLE DOWN STACK.INSTALL TREE CAP. FILL TREE WITH NEET METHANOL. 05:30 - 06:00 0.50 RIGD P PRE PRESSURE TEST TREE CAP TO 250PSV4000PSI-PASS. RIG RELEASE AT 06:00. 06:00 - 07:00 1.00 RIGD P PRE RD TEST HOSE.MOVE TIGER TANK HARDLINE AWAY RFOM RIG.SECURE BOP STACK.PREP TO MOVE RIG. 07:00 - 07:30 0.50 RIGD P PRE PJSM REGARDING MOVING RIG. 07:30 - 08:00 0.50 RIGD P PRE BACK RIG OFF WELL.MOVE RIG TO FRONT SIDE OF PAD. Printed 9/9/2010 4:37:00PM F-47B, Well History (Post Rig Sidetrack) Date Summary 07/25/10 T/I/O=0/0/0 Pull 4" CIW H BPV#283 thru stack @ 96" using 4-5' ext. Post NORDIC 1 BOP test 08/06/10 T/I/O=0/0/0 Set 4" CIW H TWC w/T-bar. RKB=26.25' Nordic 1 RDMO T/I/O=0/0/0 Torque all tree flange nuts to spec (see log for details). Pressure test tree to 300 08/07/10 PSI for 5 min. (passed) and to 5000 PSI for 5 min. (passed) Pulled 4" CIW H TWC w/ 1-2' ext. @ 100" Post Nordic 1 CTD ***job complete*** 08/09/10 ***WELL S/I ON ARRIVAL*** (post ctd) MIRU SWCP 4519 FOR POST RWO ***CONT. FROM 08/09/10 WSR*** (post rwo) MIRU SWCP 4519 FOR POST RWO SET SLIP- 08/10/10 STOP CATCHER SUB @ 5602' SLM PULLED STA#4 BK-DGLV @ 5511' SLM (5,520' MD) PULLED STA.# 5 BK-DGLV @ 2,989' SLM (2,999' MD) SET STA.# 5 BK-LGLV @ 2,989' SLM (2,999' MD) SET ST 08/11/10 ASRC Test Unit#2, travel unit to location, Begin RU **job in progress** 08/12/10 ASRC Test Unit#2, complete rig up. CH2 tie in temp gas lift. Well POP, unloading well at minimum choke. Continue flowback. **job in progress** 08/13/10 ASRC Test Unit#2, Continue new well flowback. Monitor returns for solids, increasing inlet choke. **job in progress** 08/14/10 ASRC Test Unit#2, Continue new well flowback. Monitor returns for solids, obtain full open choke, shut in temporary gas lift. Stabilize well for test. **job in progress** 08/15/10 ASRC Test Unit#2, Obtain 12 hour test, RDMO **job complete** Page 1 of 1 TREE= 4-1/16"5M CM✓ WELLHEAD= 11"5M FMC SAFE DTES: WELL ANGLE< 70°@ 9809' ACTUATOR= BAKER F-47 B KB.ELEV= 65.31' BF.ELEV= 35.46' KOP= 6341' Max Angle 95° @ 11460' DRAFT 2219' H4-1/2"OTIS SSSV NIP,ID=3.813" I Datum MD= 9521' 0 GAS LIFT MANDRELS Datum TVD= 8800'SS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 2999 2999 0 MERLA DOME BK 1 08/10/10 13-3/8"CSG,68#,NT-80 CYHE, ID=12.415" -I 3324' IJ 4 5520 5520 1 MERLA SO BK 5 08/10/10 L 3 7173 7114 32 MERLA DMY BK 0 05/09/92 2 8588 8259 34 MERLA DMY BK 0 05/09/92 TOP OF 7-5/8"SCAB LNR -I 6016' 1 8698 8348 39 MERLA DMY BK 0 05/09/92 7-5/8"SCAB LNR,29-7#, NT-95," 8737' .4 : 6016' 1-19-5/8"X 7"TM/TIE-BK, LTP w/HGR=6.88" I .0459 bpf, ID=6.875 ►i l''• TOP OF 7"LINER —L 8747' 0. 0. 8747' -I9-5/8"X 7"TIW DTH HGR 8809' —14-1/2"PARKER SWS NIP, ID=3.813" I Minimum ID = 2.38" @ 8867' 2-7/8" LNR TOP, PIN I.D. � 11� 8861' 1-17"X 4"OTIS BORE PERM PKR, ID=3.875" I III8886' H4-1/2"PARKER SWS NIP, ID=3.813" 1 1, 8895' H 3.70"BKR DEPLOYMENT SLV, ID=3.00" I 8907' I4-1/2"PARKER SWN NIP, ID=3.725" .1 4-1/2"TBG, 12.6#,L-80 KC-MOD, 8921' BEHIND .0152 bpf, ID=3.958" 8920' 11H44:11//22...' H4-1/2"MULESHOE WLEG,ID=3.875" I CT LNR 8922' -I ELMD TT LOGGED 03/28/96 I 9-5/8"CSG,47#,L-80 BTRS, ID=8.681" H 9027' rivi CO 9300' I-ITOC(08/03/10) I *•t 0• • ►.•• 9389' - 3-1/2"x 2-7/8"XO, ID=2.377" M '►W i4i ►•�•l ••i•■ ►�•�•I 004 01 7"LNR,29#,N-80, .0371 bpf, ID=6.184" -I 9454' I ••• I** M 10 MILLOUT WINDOW(F-47B): 9454-9463' 7"WHIPSTOCK H 9454' 'N' `"1 MILLOUT WINDOW(F-47A): 11034'- 11040' ''•'4:44. NOT SHOWN ON DRAWING PERFORATION SUMMARY ` REF LOG:SLB MCNL/GR/CCL ON 08/04/10 ` ANGLE AT TOP PERF:91° @ 10110' Note: Refer to Production DB for historical perf data �t�`0. SIZE SPF INTERVAL Opn/Sqz DATE ••4004 2"2" 6 10110- 10870 0 08/05/10 2" 6 11000- 11220 0 08/05/10 PBTD --I 11631' 2" 6 11470- 11620 0 08/05/10 2-7/8"LNR,6.16#,STL,L-80, .0058 bpf,ID=2.441" H 11648' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/25/92 N9ES INITIAL WELL: F-47B 05/11/92 D16 ORIGINAL COMPLETION PERMIT No: 2100790 04/01/00 CTD CTD SIDETRACK(F-47B) API No: 50-029-22232-02 08/06/10 NORDICI CTD SIDETRACK(F-47B) SEC 2,T11 N, R13E,2880'FNL&2793'FEL 08/10/10 SV DRLG HO CORRECTIONS 08/22/10 RCT/AGR GLV C/O(08/10/10) BP Exploration(Alaska) BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB F Pad F-47 - Slot 47 F-47B Survey: MWD Survey Report - Geographic 03 August, 2010 a pow //FA\ BAKER HUGHES Survey Report-Geographic by 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-47-Slot 47 Project: Prudhoe Bay TVD Reference: 50:47 12/29/1991 00:00 @ 65.31ft(generic drillir Site: PB F Pad MD Reference: 50:47 12/29/1991 00:00 @ 65.31ft(generic drillir Well: F-47 North Reference: True Wellbore: F-47B Survey Calculation Method: Minimum Curvature Design: F-47B Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29ft Latitude: 70°19'55.283 N !From: Map Easting: 650,960.70ft Longitude: 148°46'31.468 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.15 ° Well F-47 API No 500292223200 Well Position +N/-S 0.00 ft Northing: 5,973,934.28 ft Latitude: 70°20'8.783 N +E/-W 0.00 ft Easting: 652,649.81 ft Longitude: 148°45'41.319 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00 ft Wellbore F-47B API No 500292223202 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2009 4/14/2010 22.21 80.95 57,688 Design F-47B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,434.90 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 29.81 0.00 0.00 91.13 ,Survey Program Date: 8/3/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 1 30.00 9,434.90 2:Schlumberger GCT multishot(F-47) GCT-MS Schlumberger GCT multishot 9,450.00 11,648.00 MWD(F-47B) MWD MWD-Standard 8/3/2010 10:16:01AM Page 2 COMPASS 2003.16 Build 71 BAKER bp HUGHES Survey Report-Geographic LNTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-47-Slot 47 Project: Prudhoe Bay ND Reference: 50:47 12/29/1991 00:00 @ 65.31ft(generic drillir Site: PB F Pad MD Reference: 50:47 12/29/1991 00:00 @ 65.31ft(generic drillir Well: F-47 North Reference: True Wellbore: F-47B Survey Calculation Method: Minimum Curvature Design: F-47B Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,434.90 63.44 103.47 8,820.14 -420.52 1,710.17 5,973,548.69 654,368.07 70°20'4.645 N 148°44'51.378 W TIP 9,450.00 63.76 103.48 8,826.86 -423.67 1,723.33 5,973,545.80 654,381.28 70°20'4.614 N 148°44'50.994 W KOP 9,482.73 59.00 99.26 8,842.54 -429.35 1,751.47 5,973,540.69 654,409.53 70°20'4.558 N 148°44'50.172 W 9,519.71 48.51 93.56 8,864.38 -432.78 1,781.04 5,973,537.88 654,439.16 70°20'4.524 N 148°44'49.309 W 9,562.19 43.83 85.68 8,893.82 -432.66 1,811.63 5,973,538.62 654,469.74 70°20'4.526 N 148°44'48.416 W 9,592.19 42.95 76.61 8,915.64 -429.50 1,831.95 5,973,542.18 654,489.99 70°20'4.557 N 148°44'47.822 W 9,629.03 43.17 62.16 8,942.62 -420.69 1,855.36 5,973,551.47 654,513.21 70°20'4.643 N 148°44'47.139 W 9,668.67 48.87 50.50 8,970.19 -404.82 1,878.93 5,973,567.82 654,536.45 70°20'4.799 N 148°44'46.450 W 9,699.97 51.17 40.35 8,990.33 -388.00 1,895.95 5,973,584.98 654,553.12 70°20'4.965 N 148°44'45.953 W 9,735.51 54.53 38.61 9,011.79 -366.14 1,913.95 5,973,607.20 654,570.67 70°20'5.180 N 148°44'45.427 W 9,761.01 61.28 35.24 9,025.33 -348.87 1,926.90 5,973,624.73 654,583.27 70°20'5.349 N 148°44'45.049 W 9,787.53 67.58 33.88 9,036.77 -329.17 1,940.45 5,973,644.70 654,596.42 70°20'5.543 N 148°44'44.653 W 9,828.93 77.74 39.07 9,049.10 -297.48 1,963.95 5,973,676.86 654,619.26 70°20'5.855 N 148°44'43.967 W 9,852.23 82.37 43.03 9,053.13 -280.18 1,979.01 5,973,694.46 654,633.97 70°20'6.025 N 148°44'43.526 W 9,885.55 85.48 53.10 9,056.66 -258.08 2,003.63 5,973,717.05 654,658.13 70°20'6.242 N 148°44'42.807 W 9,925.03 87.39 63.05 9,059.12 -237.27 2,037.03 5,973,738.54 654,691.10 70°20'6.447 N 148°44'41.832 W 9,953.07 91.01 68.56 9,059.51 -225.79 2,062.59 5,973,750.54 654,716.42 70°20'6.559 N 148°44'41.085 W 9,985.31 90.40 76.52 9,059.12 -216.12 2,093.32 5,973,760.82 654,746.94 70°20'6.654 N 148°44'40.188 W 10,012.11 94.18 82.32 9,058.05 -211.21 2,119.63 5,973,766.27 654,773.14 70°20'6.703 N 148°44'39.420 W 10,052.75 93.23 86.87 9,055.42 -207.39 2,159.99 5,973,770.91 654,813.42 70°20'6.740 N 148°44'38.241 W 10,084.33 90.15 82.77 9,054.49 -204.54 2,191.42 5,973,774.40 654,844.78 70°20'6.768 N 148°44'37.323 W 10,128.35 90.74 82.43 9,054.14 -198.87 2,235.07 5,973,780.96 654,888.30 70°20'6.824 N 148°44'36.048 W 10,158.83 91.51 86.95 9,053.55 -196.05 2,265.41 5,973,784.39 654,918.57 70°20'6.851 N 148°44'35.162 W 10,200.25 91.20 93.14 9,052.57 -196.08 2,306.79 5,973,785.20 654,959.95 70°20'6.851 N 148°44'33.954 W 10,234.19 89.54 90.90 9,052.35 -197.28 2,340.71 5,973,784.70 654,993.88 70°20'6.839 N 148°44'32.963 W 10,279.79 90.67 85.25 9,052.26 -195.75 2,386.26 5,973,787.15 655,039.39 70°20'6.854 N 148°44'31.633 W 10,312.09 90.06 81.06 9,052.06 -191.90 2,418.33 5,973,791.66 655,071.36 70°20'6.892 N 148°44'30.697 W 10,349.77 88.53 76.80 9,052.52 -184.67 2,455.29 5,973,799.64 655,108.17 70°20'6.963 N 148°44'29.617 W 10,384.35 88.77 72.25 9,053.34 -175.45 2,488.60 5,973,809.53 655,141.28 70°20'7.053 N 148°44'28.644 W 10,417.93 89.23 68.26 9,053.92 -164.11 2,520.19 5,973,821.52 655,172.64 70°20'7.165 N 148°44'27.721 W 10,445.05 90.25 67.84 9,054.04 -153.97 2,545.35 5,973,832.16 655,197.58 70°20'7.264 N 148°44'26.987 W 10,476.07 91.54 73.11 9,053.56 -143.61 2,574.57 5,973,843.12 655,226.58 70°20'7.366 N 148°44'26.133 W 10,505.99 91.45 78.55 9,052.78 -136.29 2,603.56 5,973,851.02 655,255.41 70°20'7.438 N 148°44'25.287 W 10,535.85 91.48 82.70 9,052.02 -131.43 2,633.00 5,973,856.48 655,284.75 70°20'7.486 N 148°44'24.427 W 10,569.45 90.22 84.95 9,051.52 -127.81 2,666.40 5,973,860.77 655,318.07 70°20'7.521 N 148°44'23.451 W 10,605.65 89.94 91.73 9,051.47 -126.76 2,702.57 5,973,862.56 655,354.20 70°20'7.531 N 148°44'22.395 W 10,635.61 88.65 96.73 9,051.83 -128.97 2,732.43 5,973,860.96 655,384.10 70°20'7.510 N 148°44'21.523 W 10,665.59 88.13 101.28 9,052.68 -133.66 2,762.02 5,973,856.87 655,413.78 70°20'7.463 N 148°44'20.659 W 10,695.45 88.31 105.63 9,053.61 -140.61 2,791.04 5,973,850.52 655,442.93 70°20'7.395 N 148°44'19.812 W 10,731.95 88.28 102.93 9,054.69 -149.60 2,826.40 5,973,842.25 655,478.46 70°20'7.306 N 148°44'18.779 W 10,760.31 90.92 100.87 9,054.89 -155.45 2,854.14 5,973,836.97 655,506.32 70°20'7.249 N 148°44'17.969 W 10,795.45 90.92 98.54 9,054.33 -161.37 2,888.77 5,973,831.75 655,541.06 70°20'7.190 N 148°44'16.958 W 10,825.67 90.40 96.91 9,053.98 -165.43 2,918.71 5,973,828.30 655,571.07 70°20'7.150 N 148°44'16.083 W 10,859.34 90.77 94.12 9,053.63 -168.67 2,952.22 5,973,825.75 655,604.64 70°20'7.118 N 148°44'15.105 W 10,891.82 90.18 92.48 9,053.36 -170.54 2,984.65 5,973,824.54 655,637.09 70°20'7.100 N 148°44'14.158 W 10,922.64 89.72 89.41 9,053.39 -171.05 3,015.46 5,973,824.66 655,667.91 70°20'7.095 N 148°44'13.258 W 10,950.58 90.68 88.85 9,053.29 -170.62 3,043.40 5,973,825.65 655,695.83 70°20'7.099 N 148°44'12.442 W 10,980.24 87.20 86.61 9,053.84 -169.45 3,073.02 5,973,827.42 655,725.42 70°20'7.110 N 148°44'11.577 W 11,038.06 90.03 81.59 9,055.24 -163.51 3,130.49 5,973,834.53 655,782.75 70°20'7.168 N 148°44'9.899 W 11,086.18 90.46 77.10 9,055.03 -154.61 3,177.77 5,973,844.39 655,829.84 70°20'7.256 N 148°44'8.518 W 11,135.52 90.06 71.13 9,054.81 -141.12 3,225.20 5,973,858.85 655,876.98 70°20'7.388 N 148°44'7.133 W 11,163.62 90.46 62.87 9,054.68 -130.15 3,251.05 5,973,870.34 655,902.60 70°20'7.496 N 148°44'6.378 W 11,190.52 89.79 65.92 9,054.62 -118.52 3,275.30 5,973,882.46 655,926.61 70°20'7.610 N 148°44'5.669 W 8/3/2010 10.:16:01AM Page 3 COMPASS 2003.16 Build 71 BAKER HUGHES Survey Report- Geographic by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-47-Slot 47 Project: Prudhoe Bay TVD Reference: 50:47 12/29/1991 00:00 @ 65.31ft(generic drillir Site PB F Pad MD Reference: 50:47 12/29/1991 00:00 @ 65.31ft(generic drillir Well F-47 North Reference: True Wellbore: F-47B Survey Calculation Method: Minimum Curvature Design: F-47B Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NIS +El-W Northing Easting (ft) (°) (°) (it) (ft) (ft) (ft) (ft) Latitude Longitude 11,224.58 91.41 60.36 9,054.27 -103.14 3,305.67 5,973,898.45 655,956.66 70°20'7.761 N 148°44'4.782 W 11,267.08 90.09 60.87 9,053.71 -82.29 3,342.70 5,973,920.05 655,993.25 70°20'7.966 N 148°44'3.700 W 11,306.80 88.92 67.14 9,054.05 -64.89 3,378.38 5,973,938.17 656,028.57 70°20'8.137 N 148°44'2.658 W 11,339.36 90.43 73.11 9,054.24 -53.83 3,408.99 5,973,949.85 656,058.94 70°20'8.246 N 148°44'1.764 W 11,369.02 89.54 78.47 9,054.25 -46.55 3,437.73 5,973,957.71 656,087.53 70°20'8.317 N 148°44'0.925 W 11,399.98 92.43 84.11 9,053.71 -41.86 3,468.31 5,973,963.02 656,118.00 70°20'8.363 N 148°44'0.032 W 11,433.80 93.07 85.87 9,052.09 -38.91 3,501.96 5,973,966.66 656,151.59 70°20'8.392 N 148°43'59.049 W 11,459.78 94.88 88.77 9,050.29 -37.70 3,527.85 5,973,968.40 656,177.44 70°20'8.404 N 148°43'58.293 W 11,488.52 90.09 91.44 9,049.04 -37.75 3,556.55 5,973,968.93 656,206.13 70°20'8.403 N 148°43'57.455 W 11,518.66 90.03 95.16 9,049.01 -39.49 3,586.64 5,973,967.80 656,236.25 70°20'8.386 N 148°43'56.576 W 11,547.66 89.69 101.70 9,049.08 -43.74 3,615.31 5,973,964.14 656,264.99 70°20'8.344 N 148°43'55.739 W 11,579.02 91.20 106.65 9,048.84 -51.41 3,645.70 5,973,957.08 656,295.54 70°20'8.269 N 148°43'54.851 W 11,618.02 90.00 108.78 9,048.43 -63.28 3,682.85 5,973,945.98 656,332.91 70°20'8.152 N 148°43'53.767 W 11,648.00 90.00 108.78 9,048.43 -72.93 3,711.23 5,973,936.91 656,361.49 70°20'8.057 N 148°43'52.938 W TD 8/3/2010 10:16:01AM Page 4 COMPASS 2003.16 Build 71 SIETE Of ALASEA SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F-47B BP Exploration (Alaska), Inc. Permit No: 210-079 Surface Location: 2880' FNL, 2193' FEL, SEC. 02, T11N, R13E, UM Bottomhole Location: 2845' FNL, 1540' FWL, SEC. 01, T11N, R13E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, r'I - Daniel T. Seamount, Jr. Chair DATED this day of June, 2010. cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) TAG i iva-' STATE OF ALASKA ALASI )IL AND GAS CONSERVATION COMM! )N JUN 1 4 20106/$/P PERMIT TO DRILL Alaska Oil&Gas Cori:.Commission 20 AAC 25.005 Proposed f sf ( 1 a.Type of work: l b. Well Class:. ®Development Oil 0 -Winj 0 Zone 1 c. Specify ty iwell i pro posed for: ❑ Drill ®Redrill ❑ Stratigraphic Test ❑Development Gas ❑Service-Supply ❑Multiple Zone ❑ Coalbed Gas ❑Gas Hydrates ❑ Re-Entry ❑ Exploratory ❑Service-WAG ❑Service-Disp ❑Shale Gas 2. Operator Name: 5.Bond: ® Blanket ❑Single Well 11. Well Name and Number: BP Exploration(Alaska)Inc. Bond No. 6194193 PBU F-47B • 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 11720' ND 8980'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Govemmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028280 2880'FNL,2193'FEL, SEC.02,T11 N, R13E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: . 3272'FNL,601'FEL, SEC.02,T11 N, R13E, UM July 20,2010 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 2845'FNL, 1540'FWL,SEC.01,T11N, R13E, UM 2560 10670' • 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 65.31 feet 15.Distance to Nearest Well Open Surface: x- 652649 y-5973934 Zone- ASP4 GL Elevation above MSL: 35.46 feet to Same Pool: 645' • 16.Deviated Wells: Kickoff Depth: 9520' feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 92 degrees Downhole: 3200 Surface: 2320 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 4-1/8" 3-1/2"x 3-3/16" 9.2#/6.2# L-80 STL/TCII 2870' 8850' 8395'ss 11720' 8980'ss 167 cu ft Class'G' • x 2-7/8" /6.4# _ 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 13135' 9024' 10885'& 11708' 13073' 9024' None Casing Length Size Cement Volume MD _ ND Conductor/Structural 110' 20" 110' 110' Surface 3293' 13-3/8" 4082 cu ft AS III.696 cu ft'G'. 145 cu ft AS I 3324' 3324' , Intermediate 8997' 9-5/8" 2589 cu ft Class'G' 9026' _ 8584' Production Liner 2287' 7" 1100 Cu ft Class'G' 8747'-11034' 8386'-9030' Liner 2741' 7-5/8"x 7" Cemented Scab Liner 6006'-8747' 6006'-8386' Liner . 4274' 2-7/8" 337 cu ft Class'G' 8861'-13135' 8468'-9024' Perforation Depth MD(ft): Above Plug: 10045'-10103' Perforation Depth ND(ft): 9024'-9033' 20.Attachments: ❑ Property Plat ® BOP Sketch ®Drilling Program ❑Time vs Depth Plot ❑Shallow Hazard Analysis ❑ Diverter Sketch ❑Seabed Report IS Drilling Fluid Program IN 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Cody Hinchman,564-4468 Printed Name Jotjr( n/' , Title Engineering Team Leader - ,//�/ / Prepared By Name/Number Signature r'''' (/ v(/ Phone 564-4711 Date 6(...,1 d Terrie Hubble,564-4628 • Commission Use Only Permit To Drill API Number: Perm oval ate: See cover letter for Number: c:«47/00 79 50.0,A79�,4.?,jz?OcROc ((Oil O other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: Er 500 aOP Sf Other: '� 3 �p Si. II Samples Req'd: Yes hd No Mud Log Req'd: ❑ Yes �No 'f( wtan es.f- (,__' �-l2S Measures: g Yes ❑No Directional Survey Req'd: I'Yes ❑No Z5Q'� (JSL �hn ��+•J ,G // APPROVED BY THE COMMISSION 'r✓ ` (O Date �� ,COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit In Duplicate 0 RI GINAL 6./s-/a F- 47B - Coiled Tubing Dr...mng To: Alaska Oil & Gas Conservation Commission From: Cody Hinchman by CTD Engineer Date: May 28, 2010 Re: F-47B Application for Permit to Drill Request CTD Drill and Complete F-47B program: Spud in July 20, 2010 Pre-Rig Work: (scheduled to begin June 10, 2010) 1. 0 Passed tubing calliper inspection 04/20/10 2. 0 Passed MIT-OA 04/06/10 3. 0 Passed MIT-IA 04/26/10 4. 0 Passed PPPOT-T. Torqued LDS. 05/15/10 5. E Set CIBP at 9594' MD in the 2-7/8" liner. ✓ 6. E Jet cut 2-7/8" liner at 9520' MD. Note TOC @ 9562' MD. 7. C Pull test liner to ensure 2-7/8" liner section is free. 8. V Set BPV 9. F PT MV, SV, WV 10. 0 Bleed gas lift and production flowlines down to zero and blind flange 11. 0 Remove wellhouse, level pad Rig Sidetrack Operations: (Scheduled to begin on July 20, 2010) PEA 1. MIRU Nordic Rig 1 2. Pull BPV and NU 7-1/16" CT Drilling BOPE and test to 250 psi low and 3500 psi high A 3. Pull 659'of 2-7/8" liner. Run caliper and under-ream as needed. 4. Set 4-1/2"x 7" Baker WS at 9500' MD. 5. Mill 3.80"window at 9500' MD and 10' of rathole. • 6. Drill build/turn section w/4.125" bi-center bit, and land well (28 deg/100 planned). • 7. Drill lateral section w/4.125" bi-center bit to 11720' MD (12 deg/100 planned). 8. Run 3-3/16"x 2-7/8" L-80 solid liner to TD leaving TOL at 8850' MD. - V 9. Pump primary cement leaving TOC at 9300' MD. (29.8 bbls of 15.8 ppg cmt planned) - t;S 10. Cleanout liner and MCNL/GR/CCL log. fl 11. Test liner lap to 2000 psi, running LTP if needed. - 12. Perforate liner per asset instructions. (-900') • 13. Freeze protect well to±2200'. - 14. Set BPV. ND 7-1/16"stack. FP tree and PT tree cap to 3500 psi. 15. RDMO Nordic 1. • Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Install GLV's. 4. ASRC test separator. 5. Obtain SBHP survey. May 28,2010 F- 47B — Coiled Tubing Drilling Mud Program: • Well kill: 8.6 ppg brine • Milling/drilling: 8.6 ppg Geo-Vis or biozan for milling, new Geo-Vis for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4-1/8" Casing Program: • 3-1/2", 9.2#, L-80, STL solid liner - 8850' MD - 9400' MD • 3-3/16", 6.2#, L-80, TCII solid liner - 9400' MD - 10,300' MD • • 2-7/8", 6.4#, L-80, STL slotted liner-10,300'MD - 11,720' MD. • Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 92 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property line— 10,670' (North) • Distance to nearest well in pool - 645' (F-10B West) Anticollision Summary: • F-10B—233' ctr-ctr Status: Shut-In • Logging • MWD directional and Gamma Ray will be run over all of the open hole section. • A cased hole MCNL log will be run. Hazards • The maximum recorded H2S level on F Pad is 140 ppm on F-39 (05-16-2007). F Pad is not an H2S pad. • Lost circulation risk is medium. No fault crossings are expected. Reservoir Pressure • Res. pressure is estimated to be 3,200 psi at 8,800' TVDss (7.0 ppg EMW). Maximum surface pressure with gas (0.10 psi/ft) to surface is 2320 psi. Cody Hinchman CTD Engineer May 28,2010 F- 47B — Coiled Tubing Dri.•ing TREE= /16"5MCW_ WELLHEAD= 11"SM FMC SAFETY NOTES; WELL ANGLE< 70°a 9809' ACTUATOR= BAKER F-47A .............................................. ............ KB.ELEV= 65.31' BF.ELEV= 35.46 .................................................................... KCP= 6341' Max Angle= 35 @ 12820 I O I 2219' H4-1/2"OTIS SSSV NIP,ID=:3.813" I Detum MD= 9540 GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE Datum TVD= 8800'SS 5 2999 2999 0 MERLA DOME BK 16 0009,03 5520 5520 1 MERLA SO BK 20 04/09,03 13-3/8"CSG,68#,NT-80 CYHE,ID=12.415" H 3324' I 3 7173 7114 32 tv1ERLA DMY BK 0 05109,92 L2 8588 8259 34 MERLA DMY BK 0 05/09/92 TOP OF 7-5/8"SCAB LNR — 6016' 1 8698 8348 39 MERLA DMY BK _ 0 05/09,92 i CP 6016' H9-50 X 7"TM/TIE-BK,LTP w/HGR=6.88" 7-5/8"SCAB LNR,29-7#,NT-95," — 8737' • ;i• .0459 bpf,ID=6.875 .': 9 1 '• 8747' —19-578"X 7"TFW DTH HGR TOP OF 7"UNER — 8747' - Minimum ID= 226"@6667' N r 8809' I-14-1,2"PARKER SWS NIP,ID=3.813" 2-718"LNR TOP,PIN I.D. 8861' [—3.75"BKR DEPLOYMENT SLV,ID=3.000" cr—� 8861' —7"X 4"OTIS BORE PERM PKR,ID=3.875" TCP OF 2-7/8"LNR [— 8861' �! AAA A BEHIND CT LNR 8867' —2-7/8"LNR TOP PIN,ID=2.38" I I 8886' —4-172"PARKER SWS NIP,ID=3.813" I I 8907' 1-14-1/2"PARKER SINN NIP,ID=3.725" I BEHIND CT LNR 4-1,2"TBG,12.6#,L-80 BTC-MOD, — 8921' 0152 bpf,ID=3.958" 8920' H4-1,2"MULESHOE WLEG,ID=3.875" 8922' IHELMD TT LOGGED 03/28,96 I 9-5/8"CSG,47#,L-80 BTRS,ID=8.681" H 9027' • 7"LNR,29#,N-80,.0371 bpf,ID=6.184" — 11034' 1-vvrwS,Oc K H T1u35'CTM i, i PERFORATICN SUMMAKY REF LOG:SPERRY 1W413 GR ON 03730/00 u I 10885' —2-7,8"CIBP(10/04,09) ANGLE AT TOP PERF:80°c(D 10045' Note:Refer to Production CB for historical pert data _ SIZE SPF INTERVAL Opn/Sgz DATE MILLOUT VMNDOW(F-47A) 11034'-11040' 2" 4 10045-10070 0 11)134)09 2" 4 10078-10103 0 11/04/09 2" 6 10950-11011 C 08/29,88 ` 11708' -2-7/8"WED CIBP(12V27/08) I 2" 6 11310-11340 C 10/28 06 2" 6 11340-11370 10/27/06 2" 6 11370-11400 ( 10/27/06 15 Nip 2" 6 11754-11854 C 04)06/03 2" 6 11885-11910 04/06/03 2" 4 12015-12393 C 04/01/00 2" 4 12450-12634 C 04)01,00 .es�r►y.�O�r� ,►��i9��. 2" 4 12680-12790 04)01/00 .�i�•�i/i�•ii F- 47B - Coiled Tubing Dr....ng TREE= M6"5MCAN e WELLHEAD= 11"5M FMC SAFETYNOTES WELL ANGLE C 70 9809' ................................................................... ACTUATOR= BAKER Proposed CTD Sidetracr. KB.ELEV= 65.31' BF.ELEV- 35.48 ................................................................... KCP• 6341' 2219' —14-12"OTIS SSSV NIP,ID=3.813" Max Angle= 35©128217 0 GAS LIFT MANDRELS Detum MD= 9540 Detum TVD= 8800'SS ST MD T1,0 DEV TYPE VLV LATCH PORT DATE 5 2999 2999 0 MERLA DOME BK 16 04139/03 13-38"CSG,68#,NT-80 CYHE,ID=12.415" IH 3324' I 5520 5520 1 MERLA SO BK 20 04139003 L 3 7173 7114 32 MERLA DMY BK 0 05/09+92 2 8588 8259 34 MERLA DMY BK 0 05/09/92 TOP OF 7-5/8"SCAB LNR. — 6016' 1 8698 8348 39 _MERLA DMY BK 0 05/09/92 6016' —I9-5/8"X 7"INN TIE-BK,LTP w/HGR=6.88" 7-5/8"SCAB LNR,29-7#,NT-9S," --I 8737' .0459 bpf,ID=6.875 4i yyyyI A 8747' —19-58"X 7"TNV DTH HGR TOP OF 7"UNER — 8747' • Minimum ID= 220" t g$850 1 8809' H4-1/2"PARKER SINS NIP,ID=3.813" I CTD LNR TOP j 8850' 4 TSGR 8888' I 8861' -7"X 4"OTIS BORE PERM PKR,ID=3.875" BCGL 9425' NEHIND CT LNR I 8886' —4 1,2"PARKER SW S NIP,ID=3.813" - 3907' I-4112"PARKER SWN NIP,ID milled to=3.80'3/2- 4-12"TBG,12.6#,L-80 BTC-MOD, H 8921' BEHIND 0152 bpf,ID=3.958" `� 8920' -14-1/2"MULESHOE WLEG,ID=3.875" CT LNR 9-5/8"CSG,47#,L-80 BTRS,ID=8.681" —I 9027' 8922' IHELMD TT LOGGED 0328096 ■ G t k H 9500 —TOC @ 9300 PERFORATION SUMMARY - X0 @ 10,300' REF LOG:SPERRY MOD GR ON 03/30/00 6 I--=- -- ANGLE AT TOP PERF:80°@ 10045' ��r H J Note:Refer to Production DB for historical pert data I 1170 SIZE I SPF INTERVAL Opn/Sqz DATE .4%% '►' 2" 4 10045-10070 0 11/0409 MI �� 'cut @ TOC ..r 2" 4 10078-10103 O 11/04109 ':j ',69, ►� —, , 10®5' H2-7/8"CIBP(10/04/09)I 2" 6 10950-11011 0829108 114 , 2" 6 11310-11340 C 1022/06 •vs � 2" 6 11340-11370 C 1027/06 ` ` MILLOUT WINDOW(F-47A) 11034'-11040' 2" 6 11370-11400 1027106 ` 2" 6 11754-11854 C 04/06/03 2" 6 11865-11910 04/06/03 /Nip 11708' —12-7/8"WFD CIBP(1027/08) 2" 4 12015-12390 = 04/01/00 ` 1 2" 4 12450-12634 = 04/01/00 2" 4 12680-12750 C 04/01/00 2" 4 12815-12895 C 04/01/00 WAN,: .o►�►�to 2" 4 12950-13060 04/01/00 b'd► ►► �q 4 t ,....44'404, I 7"LNR,29#, 0371 bpf,ID=61841—I 12390' ' 2-7,8"LNR,6.16#,STL,L-80,.00579 bpf,ID=2.441" H 13135' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02125192 N9ES INITIAL 09/05/08 RLM/PJC PERF(0829008) WELL: F-47 05/11192 1316 ORIGINAL COMPLETION 04/22/10 MSE PROPOSED CTD SIDETRACK PERMIT No: 04401100 CTD CT SIDE TRACK API No: 50-029-22232-0 04/06/03 SRBMK ADPERFS SEC 2,T11 N,RI 3E,2880'FNL&2793'FEL 04/09/03 JJMAK GLV CO 10/28/06 CJAPAG SET WFD CIBP/ADPERFS NP Exploration(Alesk.) i May 28, 2010 F- 47B - Coiled Tubing Dri...ng All Measurements are from top of Riser 3/30/2009 a) top of bag f 1 BAG 7 1/16" 5000 psi. bttm of bag middle of slips Blind/Shears TOTs I 2 3/8" combi ram/slips 7 1/16" 5000psi middle of pipes Mud Cross Mud Cross middle of flow cross 7 1/16" 5000psi I variable bore pipe 3 1/2"-2 3/8"middle of blind/shears ~ TOTs middle of pipe/slips 2 3/8" combi ram/slips 7 1/16" 5000psi I I (Swab Valve Flow Tee May 28, 2010 III a. 0 a m U) t J �0. Q C4 I as cm .v •a L sw m E I LL Q ca 4 m r-IP ra = aco 0 O ° t cam a 0 N co co �= Z aau. a a m tD 011. W� N ' kg 2 a= m 0 U Z co O m CO CCO GOO O C) O CD Cc) r N M ca N in N Le O O , Q O a v O a w .x O c V W z a N 0 - > O) @ _ a) C'' v a (n J rn a N U J a; CD caj CU TD c)N — V E N d I- 3 a)s• O) N J ` art ii c V E c O) O) V a1 = 'O 2soH2 °W 2D D a) ? C o L L hi > J J ✓ 7 O O 7 '�V co d O - c 'a a co ` .. J J C7 w "- C C w Q `1 H la N R C V E N _ n d C 3 9 . O ` C U R d O 0 _ . a) , ✓ V N it M N w W E = = . O p ce a) : 1- . V ° • i > R N N N- O O V:_. O T O d J• I- E Z N ° N IN O) O O a LO Q O N O O)ai 1_ O 0) O M v CO O. LS rn O y .4,*.1 CD Cr) O = Cl. °' CO a ka co m < I— ° Q. '0 E o 0 sr, .-. OO d x CO co d a a)' ~ w V iTs La N CO C O) co (N C ' C m y l c C o O A O .c = r � Z W co t u) )a o z w( rn o O Z o Q J a Q co m o --s .t W 0.) N R O c ° ° O d V N O '7 I. L 0_ N E a c '� a m ca z co N rn lL �- M 00 w� a v x = r N 0. N Z O O O O m CO O) Q co O O yO O O co O a) o as o () LL E oN a Q L mZ ° a co a) m m d^ c m v m Z Li ca U m N- h a d N N a p. L.L. a • m a a) al I" LEI_ LPL ca 01 c N N O Q o d �0 ) CO Z w o ? L.L. v m m Z ¢ c + + 2.., Z Z a a Il a s '. O W to to VI t C m '0. N • o c .°. c y u ? aj�I £ y 7 N a) d rj `Wy C .. i.c C CA C o c °— z = �a ° MI ma Qd . 2 o) y to ° N a r_ a r a c _o o a= O `O C) d y O := at O N N N N Ti R t) N m (.) moss ° a• E c9 E ti in u_ a° 3 0- 3 2 o < > > CO o rn o 0 0 0 -t.•, 0 N- 0 0 0 0 N. o V O o O O N 0 CO 0 0 0 0 Q a W W . - T CO CO C o RI o LL CO oa 0 0 CD CO 1.... 0 CO 1 0 N CO CO CO N- co O O U) co CO V O Co (o co co (o N 0 N x- CO a) U) V N O CO I,- Q CO d N cd N N M O O a) O O O a aa,, Ct r M U) co O U) CO a) N 0) 0 in CO CO CO Z 00 r r 0 o 0 5. I,- a) w a a) m • a Z 2 0 v 0 0 0 0 0 0 0 0 0 0 0 (O J N 7 Q o 0 0 0 0 0 0 0 0 0 0 0 U O N a) CO O CO CO CO W W CO co 00 r- CO E co N N N N N N N N N N c I ui N- C) v a) co co 0 Co a) a) LO U) v ✓ .a 0 N CO CO CO N N- V CO U) 0 CO U) C p CD (r) N r O U) M CO N (O a) V V o L CO N V co a) co N CO CO a) 0 U) N w O) CO V V V 4 U) U) U) U) U) CO CO CO •. CO = v v v v v v v 4 v . . v 4 d 2 = ul U) U) co 1 co co co U) co U) U C '', 00 ... Co (O CO CO CO CO CO (0 CO CO CO CO CO « 0 W • a) c u o c CO 3 L L. N c s- U „N-., a) o) U) CO CO N V V r co a) ` yd l0 �, j co co co a) co O N O co O y.. 0 O) V W E CO (O N (fl N N M U) a) N- a) O r ✓ O) w m T R OI V CO M N N N N V (O r` O CO i0 C4 r2 L N L I- = U) U) U) U) U) U) U) U) U) U) U) co CO (a CC U M CO' M M M CO. CO- CO. CO. CO! CO. r ri> o U ° m m rn rn rn co rn CD rn rn rn CO rn J F- 2 z fq 0 m m U L6 1.6 U) to" (ri 1.6 (n 1. (n CC) (n (n o Z C C O. CL 'C E N 4 o V co o co a) CO (o Co co co O U L 0 CO U) V CO N V CO N CO V d U O N V CO N CO U) (� V CO N r C) CO co 0 CO V co N CO (!� co a) d C CI cO n N- r- co CO co co rn a) a) a) a) al Q a .o a.W U N CO CO r� V Co CO r CO N U) CO N . 0.. 0 x- CO CO I"- CO U) U) 0 CO CO CO O) O V CO V CO a) CO CO V (O V V r- C) E N CO CO 7 7 V C N a) N- (o CO co) R (n `T 'T 'T 'T 'T 'T q' V V M M M N Z 2 (0 Q. I- 0 U Z I- (.5 2 co CO N V co 4 co CO co a) CO N ✓ CO N 0 U) CO N CO CO v- CO 0 0 1` V CO N r CO O a) N a) M N 4- U co CO co O N V 0 x- CO V' CO h a) CO N. N- r CO CO CO CO a) a) a) a) a) a) N CO W cc CO CO CO CO CO Cb CD N N CO _c O E F O - N- N V N (o 0 CO r I,- r` (, C V U) U) U) CO CO N- M N V V V CO 0 CD M CO CO N- O O N CO CO CO W p U EL 0 0 O 0 CO CO CO U) V CO N N N . o)" l- •- m , 0 E LL O N U Q N N J U7 (n N it V M Cr) Cr) CO CO 0 U) r V U) 0 Q V CO 0 CO V CO CO 0 CO O CO 0 O) O a) CO V CO CO V V N U) a) CO V O CO CO CO .J U) V V V V [r' U) CO CO O I,- N O• CU U .� Q) V ^ = E N• O LL lL F ai` O tL _ O W Z d d LL d d al O O 0 0 0 '0 0 O O O 0 0 0 O 0 v LO N o 0 rn a, rn 0 o rn o 0 0 0 0 0 0 0 0 (n CL ° V' O O ... O O O O N- N- O O W CO M co 0 N 0 U) CO 0 N 0 N U) CO 0 CO 5.. Lo o a) rn a ai O o C rn CS) ai of rn COL ai ai ai o) c � W Q .. O • LL C H Y W V N CO n b O) e O`M' u .. a m E o d H mU) (CO = Q Q. 3 3 o rn a Nr• o o O co O O co O O co 0) O N O 0 0 CO CO n 0 0 0 0 CO CO 0 0 0 r 0 0 0 r- 0 0 0 0 0 0 0 a y t� N N O O O O O O O O O O O O O O O O O .Q 'O co co CA 0) 0) 0) Q) (P W 0) 0) O) O) ) O) m 0 O) 0) 0 m 0 lao CO N H m M O N M N Cr) N- V CO O) O N CO CO N- O O 0 CO N 0) 0 CO 00 CY) O V T- O N CO CO 0 0) O Cr) A- N o N CO O C� O r m 1- Q CO 0 O N O 0) O W 0) r--: N.: N- M M CO O (0 V' 7 o O M a. �` V d) O Cr) O CO N- W N. CD CD 0 CO CO O N CO N N N 0 V v N V (D N. O 0) Cr) O N N CO V V O CO C- CO O) Cr) 0 O j N �- r N N N N N N N N N N N N N N () O ; 0 0 N_ m0) ma` ° Z ( 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C�) J N 7 < 0 0 O O o 0 O o 0 o O O co O O O O O O o 0 U , O O co O N N N N N N N N N N N N N N N N N N- N ,_ E co N N N N .- r r 1- .- r ,- ,- s- V > C co= a) N co a) � J o zz Qj co CO co V O V N- CO CO N- N 01 0 V N CO O V 0 ,- O C.> 17 0 CO N V CO N CO V CO O N Q) CO CO V cr d' N 0 0 C 0) 0) � N N CO O N- co co co N- h O V N N N a) t O N N N N O 0 0 V 0 0 Cr) 0 0 0 V D CO N- N- CO CO 0) 0) 0 - N- N CO V cr O CO CO r CO 0) 0) w a) V . d' V V - V O O O O O O O O O O O O O O N rL w' V O O O O O O O O O O O O O O O O O O O O O C R`-- Co CO Co CO CO CO CO CO CO CO CD CO CD CO CO CO CO CO CO CD CO 0) O W c a> c> m ▪ V a) 0 3 •C V O) N. CO M CO O CO 0) CO O) 00 CO 0 CD V CD V d Q 0 . w R .- N V CO CO CO CO e- O V CO Cr) N O N- V N e- N O CO O w • a) V N CO N N- C- CA O N- O O• O r o V V M N- O a> .- Ce >, Ca p> 01 CO CO 01 Cr 0) O 0 N V' CO 00 CO N- CO r 0) 0) 0 R it w t m a c CO N- N- N. n N N CO CO CO CO CO CO CO CO CO CO CO rn C1) rn U D 'C w t — M CO CO CO M C+) C) M M M c. Ch CO M M CO CO CO) M C) M J > .L Z to D p 01 0) N. 0) 01 01 0) 01 0) N. N- 0) 0) N. N. 0) 0) 0)) 0)) 00)) 00) C) (n u) O id n O ) C) (n in"' LS ui ui u u ui ) (r) (n LS -t I- o CL C4 rvo in N- o O CO CO CM CO o 0) m v O co N- CO 0 CD v O O - N N CD d) CO C� O Q7 O O V o M V O CO N V CO V 0) O 0) N O O M C) n N- N CO O V M 0 O C� O CO O CO CO CD 0 O O O O O O V O O O m CL O O 0 N N co V O O CO CO 0) O O x- N N Cn1 N N N N N N N N N N N N N N N N CO M M cM M QI- aM W U CD N O r O CO CO n O N CO N Cb CO Cr) 0 N O CM O O c- CO V V O O V CO 0 0 N N 0) 0) er m N V 0) O O N o V V O T O O 7 O N V CO M N N 0 CO CO CO O CO O .7 N 0 0 ,- N N 0 0 CO CO Cr) CT N i i i i i i i i i a Z - N V d' O N- CO N CO 0) CO CO 0) N V 0 CO CO 0) C` V N Cr) O V V o CO V (N O) 0 V CO 0 CO N- O N N . 0 O O O O O O C) C) C) CD CO CO CD CO O O O O O a1 0) 0 co co O co co O co co co co co co co co CO CO CO CO N 0) 0) 01 0) 0 Cr) 0) 0) 0) C) 0) Cr) 0) Q) 0) 0) 0) 0) Cr) 0) 0) Cl) — CO co co- O co- O co- O O O O O O O O O co- O O O O ta w ).- N V C) N O N O 0) O N CO CO CO N Cr) 0) N CO CO CO N . - '7 O V O V N N N 7 O O O Cr N N 7 O O O '7 - O CT V O (D O M CO M O r N O M N M O C) N co O O co co m 6) CO r CO N- CO Cr) O 6) co r N- CO Cr) 0 0_ Q y CO :.. Cn a _ _ _ J V 0 0 (N (N CO 0 0 O) n CD CO (fl 7 V _V CO_ N_ Q V CO CO co CO N N N N N N O o J O 0 o O O O O O O O O 0 0 0 0 O O Cr) Cr) 0) 0) Q O) 0 01 O Cr) 01 m 0) 01 m 0) 01 0) 0) 0) O W •0 > CO m V . 0 m V V C v 0 0 Q 0 d CL LL O 7 m V CO Ca a) Z z 0. 0. LL d d 0 v o V N 0 v O O O v o 0 o v O o v o o O V (� N O O O O N O O O O O O O O O O O O O O O O O W Z O o O O r- O O O O O O O O O O O O O O O O O Cy o 0) 0 0) 0 o a) o 0 o v O O O V o o a) o 0 o v er !� N 3 O O O O O O o .O .- `— N CO V V O CO co 0) 0) O N N O o c o o M O O O O O O o O O O O o t0 _ lgo O- v _ d a) c o co O cv o wddo co m a= UaiA O a 0 N V O 0 V I . - O 0 0 LO LO cq C a Lri.0 -C rn rn rn 000 cc in cc .3 CO 0 V Cam) (0 03 o M O) I— C3 N CO co to V to N- O) 0) �O O Lc) CO 0 CO Cn V Q V N 60) O s- N M M o V 0 0 > caN M M M M M M 0 w O O ma' y a a) •- m J N 7 Q 0 0 0 0 0 0 0 m ` U _ N CV CV CV CV CV CV N Cn 7 O a) Lt_ c .1-N. E— 2 _1 o cm r. O — CC) .� C)) IO CO O ID V N M C O O O o0O On) 000 COO 000 w O) O N M M w a) C = n (COn (LDU LO u') c0 u') C •�`-- CO CO CO CO CO CO CO 0 O w = V • C 10 'O = V d 3 9 ` V 0) N- Cb c0 N cn • ,_ w /0 M CO V CD M t7 ✓ 0 N _c T l0 co 00 O) ON) O O O O To Ce c.)• >� O 7 R rn rn N- rn N- N- C)) .J I- 2 Z N 0 O cti LS (n in' in' (n cri Z t LL/ N- CD CO LO M N 0) O O) h CO 00 N O) O) Cn r r N- N a c V u-) cLn CO N- N- C M M M La M M M M � < I— W Q. CO 00 c0 N M N in CO M N O) O O O O cc h (.) N M p) U)N Q. Z •-• o rm cco ccoo Lo CO N o (ri v v v ri o 0 co rn co co co co C) G co co 00 00 c cc c > — I- V N 01 LO cD N N M M C)) R) M N CA N.- V O) CO N- N- LO V V' d y 0) .• °� ca N_ _N O M ,- N- < N 0 O O O O N N Q) O) O) O) co 0) o) CO• >, CO m • r c.- � m vv ems. Q a)m LL w a o ? m 1---. m• m o Z Vi Z o.. d L.L IL d W 0 O LC) 00 00 00 00 LO �= T o co .w ID Sill WM A p e a�i °r o MI�' au .. .0 rn C o a= o 2 ' (� m c� a �n33o a r O. = a co 0 .0 (0 C '00 O N to CO N O co co CO La oi r 7 7 7 to ccc) 7 to 00 O cri V V V N 4- R 7 V V)M co c- a Co Co `Co v CD a. • 7 Z >I z z z z z z z 0 0• > co N 7 7 co O CO tLU coo C..) co 7 N- D) (0 C) O O '0 N 7 N 00 N- CD to d a co .2 a r o b 0 b b b b ~O )o CO O '-' N N N N N N N (n C) O) j C J 0 O O O O O O J N U Q r 1` n r r- r- - @ v a) - 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O o 0 o ` c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 o O 2s2too1- gW o 0000 0 0ccioui o 00000 ui o o ui 7 7 ,- M ,- co 00 '- co - O O O to N 1- 0 co D) ✓ r 7 co 7 CO CD 7 7 7 N- N. N- N 7 CO 7 CO N 0) • 7 Lo co- CO 7 7 CO O co- 7 7 7 (O O O O (D 7 7 C co co co co CO to to LO LO LO to LO to CO to Cf) to co co LO C 'O •0 g CD co CO co co co CD CO CO CO CO CO CO CO CO CD CD CO CO CO O ` -C W w a) co C 0 0 •o 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O co O O O C- C 0 C _, 1.6 C[) to to to to to O O O O O O O O O O O O O r 1` 7 • 7 CO CO 7 C) "Cr 7 7 co co N N CO 00 ` c d 0 a) CO M O CO O to CC) CO N CO CO CO N. N- 0 r 0 C) N- Co O w y N V 0 C N- r N N. r N. N- N- N. N. h N. N N- n N- N N- N- To rX 4- s m a r= C CT CT D) CO CO CO C) CO C) CO CO CO 0 CA m 0) rn 0) rn .0 a to Lo to U) Cf) to t1) to tl) to Cf) u') .Ci tri it; lfi L(i t1'i Lri LU O O 0 7 co JI- 2zu) CI t I O CL i re a) O N N 11) 0 O N t` N O) O) (D CD CO CO M M r O LO to C[) 7 7 to n O) CO 7 N N 7 co CL Q) ao N C) N N N (O N 1- N- to O CO (D C) O C) C/) C N- n 7 (1) 7 N N to CO to 7 "Cr "Cr C) n CO LO N CO U) O O r CD N. 0 0 N. N- N- 0 0 0 to f` CD n co O to Cl) c W - N N N M N N N N M \i. N N N CO' C') C'+) M C') N + Q 1— W W W iri O. N- N _ O N- W r a 0 to 0 co 7 co 7 co 0 Co D) to O) O 6 O D) 7 co O co m 7 6)M N- 1. co O co co_ to V to 7 O 0 O LO C) 7 N.O .- I�co LY I- to 7 t1) O I� O O O CO 1� CO to h a0 O CO to O C! CD m Cl) 0— O 7 (O 7 to (N to Co— M 7 .4- O CO Co O(O CO N m (fl (O O) O 0) 7 7 CO N- CO �- N N .- n 01 0 N Z Z Z ' Z ' co ' N CO + cco co c coo Z Z a N N to N N N COO N O' 7 7 7 of N N 7 0' 0 0 0 0 O r O O O O 0 6 0 0 0 0 0 O N 0 0 N 0 o, 0 0 0 0 0> 0 0 0 0 0 0 0 0 0 0 o p o 0 o p di O O O O O F O O O O 0 p 0 0 0 0 0 O? t)i 0 0 N> 0 co co cs CO co co 00" W co~ CO-M 7 co ttoo co c co 7 O O 7 N- N- N- N O to co oo co D) O) N- N O) Co O 0 0 co 2 2 2 0 0 0 O O O O O O O� O O 0= .O�- ^ O O O • O•M O O M O f)) G M co co N_ 7 CO co a.d G ... C)) O7) O7) 1- N co m 75 (o 113 O) N to its to "`LLLC O M CO co to aa o a :t. 0� 0� 0� 0� 0.- a 5 6 m `c c c c 0 0 +@+ 0 0 N N 0 U N O.. 2 0a) cO 7 c% Z z• a aIl0. a o) cnN = N N rn ET rn Cn LO N `@ m co N co 7 I co N CO 7 N 7 N M 7 to a) m N N N W 0 0 to 11 C C C C c to N C C C C C O N C C C C C C Cn .co N .co v fAX E y o " E $'o '0 0 0 Eo0 0 0 0 mEm'o '0 0 0 0 toE Mr CyE � E u� T N Co d Q c 0 a a a @ _>, a s o C >,o- a a a a c,C — cc C.0 — c `Wul a .. t_ y z to u mo LI co ado mo F� o co f= @ o �� CO U _ o1L N m ad m ad mad m as m ad m fl.d m • N 171 K .. _ Q= • O r N d 1' 7 7 d' M . d . 0 F- F. LL U LL LL LL Il Il cv a CO 0 U h t0 o tvi C O U = ;:r N M W co co a a a v N 0 Z 0 0 0 2 to O M O ON O C m. ) ] > a, a OO ,- O CN J 5-= V a O ■r- CO ii Cn 7 Cfl C V E ) ) ' 7 ,C 0 O 0 0 i : : jw • v• CD to to to to to to CO CO CO O O O y d. CD ^ V O C U a) O O m w co CO W _ O w a� to U H r- o " re T m Cr) Cr) O) c2 r at R tri L6 L6 to J• r2Zy0 co N- d N r N E - m coa o re 0 ID CO ID CD LO CD m C ° °N o O rn N M M N Q I— W O. o W ^ n 0 a v� v v N. CO CD,- COD N N Z m N Q. to O N a) I E m O, O O Z O O O '.. co co .4 In W 0 2 O= O O O) O V ap ✓ n O) N a m m co v _ O O co m t O U °`° r d x g o� � co Q > T CI Co• T m m a) O • m vt vt C -0 O E a) m t■ LL 0 = o Q O a - . N y n o 2(0v m m too Z za0 LL. aEr- O. N to N N N to 7i- I. W (/) C/)c c "' N_ EOo O cri `we I : ! I0. 0. o.c 1- tya rid Q, = a .n 45 m5 0 U a) CO C c) m O = N (7 CJ) Li N O I o 0 U 0 o v 76 0) ma o > Z U aD a, c (/) J N ( a iti a) (4 V cf., LL — ( �. a) .E2 m a) 2 c ❑ 4; u .o c o 2 L w d rt 2 O C O d ' • u 'O C u 0 V W to To U 0)w Q' T co CL W rt = N . p 0 C6 C o 3 o J I- f Z N 0 L, O W N O cm J J a c ❑ ❑ CO ID a CO O 1-O O 0 0 a 0 m a) o v n 17 CO eu m 10 CO co E o m a o o '6 > m E a O c o .- c a) v co co r� co ❑ `p_ a C1 H Y w v In co N- co rn w I- a Q N- V COO LO 7 CO C CO CO d' N CO M (0 4 M N LO CO N O N- V O N CA V 0 N CA O 0 0 C) V on N _ CO co O C7 CO N M LO CA CO O CC) 0 CA O) CO CO N - N— N N- N-N- CO CO CO C) Cr) 0) 0) 0 . N LO N- 0 N CO N- 0 W N N N N N M C') C) Ch CO c ti- 0 O 0 O N O CO N- V CO M N 1.0 N- N N- ,- CO N CO CO V N O CO C) C) r CO CO 0 CO s 0) N- CO 0 C7) CO N O V CO V CO C.d V CO 4 V O V CO CO M N Cn O• (p N M M V V V 0) N- co co co V O CA CO M J 7 7 V V V V V r) M N N Z + 0 Qm C) CO N V Cn CO M Cr) CO N N V N- 0) 0) 0 — 0) CO CO CO N O CO C) O .- O O N- V CO V V V CO N CO O t V 7 CO N r- O CA O O O co CO N- CO CO CO V O Q E d. r- N-- N- oo co co rn rn rn rn C) rn rn rn C) C) C) C > a o ao ao m m CO 0o Cn ao 0 o ao eo ao ao eo ao on' Co CC m m CU m V V E a, „ L.L. LL .O 0 0 0 0 0 0 0 0 0 V V V 7 V 7 V O O) 0 0 0 0 0 0 0 0 CO CC) CO LO LO U) Cn Cn LO 0 =▪ L a a- - V O O O O r` r- N.: r• O O O O O O O O O O p .2 m V W M N d V C� CN m COO co N I N CO co O 60) O m V N- 00) N V N- Z Z d d n_ n_ c d G of rn rn of ai Oi Oi of of m m o 0 0 0 0 N 2 Lo W R m 6Ni v T O a Cri `W� c c Y O `W' a u • a cr Q ) o a= o o d as d R co cri W4`Y 1 QQ ` T n5 „VINO mo s — R ressmok • -1 ri A I o A 8 Q bill E 3� 5 MI1I A" y/ ■ $ IS '1 ' Ma1II hWA I o �- y 8 p 4.1 8 b -O N O lL• a ›.. / •m -_ O• a v GO - __ a_ Cog 'a as s LL v a - o m0 iL \ d .b vo • .f I' F v° .R o z 3 S 8 8 8 8 ° _ 8 y w - 8 0 8 8, wi 2 a (¢!/$(KO(+)g1.toW(-)DnoS g `° w ° o N N co P 8 .2 I o 11 to i 0 /\ y��/j I-Y W qua co�m co.-.-W G— T Fs _ << 5 :O NO'H'O M4R82 ,/88' 1���< — g a avvv `.f3�no.n 2mcc�cvrXi� -3 .._ T '" 8g<eos8888888°888888 ' is q' a �o-g8° °8 °m8°8°si°N s wi a ' N N N N N Q i mvsY F8N88888888888888888 a a l 4 p o n Nm N m R m m R m N N N N N N F„ On/; / o$ Sao A gl'—n r��n . u,�o N -- 4 r S n � [O�O N O J N O N�N 1�Q,gg N ° f i ' S ;' LL °9m R °, §aOmONi0iOisig£:Ig"`aiFS1% ° ° R H N N 4 °W emgxs2vss�<aseea2,so - <ag ag agP25? 4^<44«44-448 0'-- -8 fg a S =42o2W°sass<gA°oeN-� m ���ase44 s;Gs�ss sss ��m v .13 3g ❑5?gsggggggs ssss sans - 3,._ 0 66 20 N 7<..,mm N� <� ��m� (u!/S 09)gxdaU IsaivaA an.u, vi W MI mi0 .. . _ . CO ' -§ R ii ! . '--1 - ' t \K\ff 2� � / t 'jg/! K ! f ® . . § ||||| ��.� {!!&! , \ #/ | . . . a ='41 - f [f 2 ~ \ § co Z ¥ .1 ��I f EI �_WINEMIEFIN 1 ��11 ~ Nomora mou R ! F L. T� ~ Zr �& ��. . 3 -/ ---- Q, c = / * k @/)�; § - ; � . g4§ . gym ii m . f en 12 / M § k III •| , 7_- j \ \.\ §; 7 b i , ,e ® .w \ Z %sa All__■4 $ ... �� _II ����. ,��•• . \ $&� A ! Op cg 9 a. F � � (3 \ ! R#j a » ‘...N% . { r a �� t k A 2 ! § ! $ £ q ,Si 5 § ° f / % ! ! ` { ? a m (q0!)+ o�@gn . k 8 oi- cv f IN if i co NZ i4 ° All o°�ogm .m8mtim rg 18:8$$$888888m8 88 8$S; ELL Sm It 'SSryS° R°mks;°bt°8H. tc3.= ��. N mi= d 8888888 $8 $$ $ s m e ' ` LL LLas g 3 s' » !::a! 4 2 40_ 2! s � sa:� � 2e VM �� . =ss $ a $Aga 4� ,am �maa "a ! ii i .pgm8 ,IYimge--^-8-sgsm 4!;--- 'ia8! ;.;;.gi • 7 : 3giliii4 $q'' o Las 4+■714++7+ + +, 447+447 +■1 LL a i "AT O1 a n W 01mo°aIgagaeass-08a O - C C z mimi8iii$iiig &$ - ro o0a L os2`12RA aSS;W a o _ - I�° ce � E 4 IaPPssass4tiRm.;_^ m i 2011 Mil =gi g888888888xax3133g 3 s IwmW _�m.mm^mm -,,,.mm mp 1 8, .\\ 4 a 0"0---*-:----- ----------=--------.-----—----- =--- ----'.-.. O..-!,.--a:_______—__-----.---------------------1.._---,--\----\-------.- - //7 Vl N�Kr -/ (Q N rm �mrn�= tittat �Qr \\ O S� W CD m N O 95 N (O O V 2 :. m N. ' .O t(pp r N_ V m 100 p -N� .-I �N I I� ��� V N� � � �I7 Qi �� (O OI 4,Y iY yo �� /// 5 a'd— dm ���� �� N / /_ A *...-._'''•.........___ILIt -----.-.:----- - .—.---''----. TD 2- ,tt.44::11111ptgimimmogN0011111k 0 if.\„,....., ...... ... V=...'.../.- .................,......e....... ............. >..,,,....,,,,,,,,,,. , ,. A 5 N 5 Mk BAKER HUGHES North America - ALASKA - BP Prudhoe Bay PB F Pad F-47 Plan 1, F-47B Plan 1, F-47B Travelling Cylinder Report 26 May, 2010 Qbp I1' BPPASSPORT ' BAKER Travelling Cylinder Report 0 bp HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-47-Slot 47 Project: Prudhoe Bay TVD Reference: 50:47 12/29/1991 00:00 @ 65.31ft(generic drilling rig; Reference Site: PB F Pad MD Reference: 50:47 12/29/1991 00:00 @ 65.31ft(generic drilling rig; Site Error: 0.00ft North Reference: True Reference Well: F-47 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 1,F-47B Database: EDM.16-Anc Prod-WH24P Reference Design: Plan 1,F-47B Offset TVD Reference: Offset Datum Reference Plan 1,F-47B Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+ 100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 9,434.90 to 11,720.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,369.02ft Error Surface: Elliptical Conic Survey Tool Program Date 5/26/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 30.00 9,434.90 2:Schlumberger GCT multishot(F-47) GCT-MS Schlumberger GCT multishot 9,434.90 11,719.99 Plan 1,F-47B(Plan 1,F-47B) MWD MWD-Standard ---------- Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 11,720.00 9,045.34 2 7/8" 2.785 4.125 CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 5/26/2010 6:10:28PM Page 2 of 25 COMPASS 2003.16 Build 71 BPPASSPORT • BAKER Travelling Cylinder Report 0 bp HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-47-Slot 47 Project: Prudhoe Bay TVD Reference: 50:47 12/29/1991 00:00 @ 65.31ft(generic drilling rig: Reference Site: PB F Pad MD Reference: 50:47 12/29/1991 00:00 @ 65.31ft(generic drilling rig: Site Error: 0.00ft North Reference: True Reference Well: F-47 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Weilbore Plan 1,F-47B Database: EDM.16-Anc Prod-WH24P Reference Design: Plan 1,F-47B Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB F Pad F-03-F-03-F-03 Out of range F-03-F-03A-F-03A Out of range F-04-F-04-F-04 11,200.00 9,925.00 810.82 204.78 639.69 Pass-Major Risk F-04-F-04A-F-04A 11,200.00 10,425.00 683.54 205.39 484.43 Pass-Major Risk F-04-F-04APB1 -F-04APB1 11,200.00 10,425.00 683.54 205.39 484.43 Pass-Major Risk F-04-Plan 2, F-04B-Plan 2 10,047.21 11,560.00 524.97 184.63 340.34 Pass-Major Risk F-05-F-05-F-05 Out of range F-05-F-05A-F-05A Out of range F-05-F-05A-Plan#3 Out of range F-10-F-10-F-10 9,580.00 9,625.00 648.96 487.73 233.82 Pass-Major Risk F-10-F-10A-F-10A 9,580.00 9,625.00 .•: •. / 487.74 233.82 Pass-Major Risk F-10-F-10B-F-10B 9,622.56 10,225.00 232.70 455.66 -207.06 FAIL-Major Risk F-15-F-15A-Plan#1(+500) Out of range F-18-deleted me Plan F-18A-Plan#7 F-18A Out of range F-18-F-18-F-18 Out of range F-18-F-18A-F-18A Out of range F-18_DIMS-F-18-F-18 Out of range F-18_DIMS-F-18A-F-18A Out of range F-19-F-19-F-19 Out of range F-19-F-19A-F-19A Out of range F-19_DIMS-F-19-F-19 Out of range F-19_DIMS-F-19A-F-19A Out of range F-23-F-23-F-23 Out of range F-23A-F-23A-F-23A Out of range F-26-F-26B-Plan#3 Out of range F-27-F-27-F-27 Out of range F-27-F-27A-F-27A Out of range F-27_DIMS-F-27-F-27 Out of range F-27_DIMS-F-27-F-27 Out of range F-28-F-28A-F-28A 9,980.00 9,975.00 878.79 211.36 672.56 Pass-Major Risk F-28-F-28A-Plan#2x Out of range F-28_DIMS-F-28-F-28 Out of range F-28_DIMS-F-28A-F-28A Out of range F-46_DIMS-F-46-F-46 Out of range F-46_DIMS-F-46A-F-46A Out of range F-47-F-47-F-47 9,524.97 9,525.00 0.65 4.69 -3.68 FAIL-Major Risk F-47-F-47A-F-47A 9,524.97 9,525.00 0.65 4.69 -3.68 FAIL-Major Risk PB G Pad G-29-G-29A-G-29A 9,500.00 12,830.02 1,025.26 185.70 840.10 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 5/26/2010 6:10:28PM Page 3 of 25 COMPASS 2003.16 Build 71 Alaska Department of Natural 1"-sources Land Administration System Page 1 of/l Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28280 Printable Case File Summary See Township,Range, Section and Acreage? Yes 0 No [ New Search LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28280 Search for Status Plat Updates As of 06/15/2010 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility:: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 013E Section: 01 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 013E Section: 02 Section Acres: 640 Meridian: U Township: 011N Range: 013E Section: 11 Section Acres: 640 Meridian: U Township: 011N Range: 013E Section: 12 Section Acres: 640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-91 T11N, R13E, UM 1, 2, 11, 12 2,560.00 07-07-1987 ***LISBURNE PARTICIPATING AREA DESCRIPTION*** T. 11 N., R.13 E., U.M. SECTION 1:ALL 640 ACRES SECTION 12:ALL 640 ACRES http://dnr.alaska.gov/prof ects/las/Case_Summary.cfm?FileType=ADL&FileNumber=2 82 8... 6/15/2010 TRANSMITTAL LETTER CHECKLIST WELL NAME , 42.1./ STS PTD# 07/0099 Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: , ,,�/Q & 2 9,Y POOL: ,,eC/,D4/DE" /.9/ O/G Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name)must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 III To u) o) 0 a) °- N ,(n a) 0 o m 7 .) c Q c 0 a) 0 > L m w u • Oaa) c 0 E O (0 rn 7 E. a` a) _ m 3 m n 0 To L co ° N- N co O cc>ca O ,N a. O 43 a o a .L o p - ° c co o iI>p m d ✓ O a w ° _ a N 3 W H 0 o a) �, oo E c as 0 H n�i a) w 2 M m E Y c 3 M .- w o -°c a L.L co. Q N O n o_ co °v CO C V •N "O CO O co 0 N W Q • w a) C a) w a� E > m a) 3 O M v c c a 0 2 rn Q tL c = N t o .u) — u) (0 I� > CO O_ D▪ m C) V c a) N a) N O L i Co O E 0 C n N O O u_ 0_ CO C v0) U C) a L 'uN) 0 cN•) .a 'a. o -o, N c c a) c -p a3 0, u). Q) O c O <� .N U 0 a) c c. u) M CO 1 2 N O O (0 N C a0 n N _ Ur CO O U U O N n N n II W a) Z a) 7 ti U. U U C 6 a0 E N E II o > a) o N O 7 7 O N ° ° O N (0 Q N a7 • z Co O U) U) 0_ O cC co o_ s 2 2 I 2 W 0_ > w 0 Q Cl) a a) a) a) Cl)) a) Cl)) co a a) a Q Q Q Q Q Q Q Q a co Cl)) co co Q a) Cl)) Cl)) a) a a) Q o Q Q Q Q a z Y Y Y Y Y Y Y Y Y Y Y Y Z Z Z Z Z Z Z Z Y Y Y Y Y Z Y Y Y Y Y Y Z Z Z Z z z >, H O a) (n u_ CO N 2' 0 (13 C U n o c .� E c E 3 — E a) O U 0 c 0 C o O 0 U (n W a _ N T a C L O E LI) it o o a) 5' U ✓ a� a) E 3 o co co N'2 a)i T O a) c U C O J o .a.c 0 0 E a ) a) O u) 0 Q 0) >o a) E u) 0 LU co _ u O O N n CV 0 0 >. C LL C J• n N m n • o Q Md v o o E p a) = 7 o) 3 .c o > 3 0 a) O oM o o �S Q U a) 7 a) os CO T L 0 0th E a) m .a p co 0 N a) co Z — L 01 U > a) 7 3 ° U) C O) L C N j O' 7 Q N N a) .. w -o O c "o E -9 a) N n D O C O Co p O 0) a) L a) N O) 0 = a) 0 a) .'> U • > 'p n N ul d u1 C C O O ° O)O Q E E 'O C C E N O CO C C N H ... C O OZf a: C a) .L-I o1 n N L n C C 2 Y o w 1° 7 0 -o o c 3 o CD 'n 0- a� 0 o — ° 3 o 0 u) 0) _T ° a U) 0 c -o U m y O O Q o a) c o U a) N > (D Y d u) p C c p C a) CO C m Q (6 O -0 O ca O a) N D Q' L p a) O T O 3 3 "O c0 .m O Y m O O O E f0 (6 9 T C ' J U U a) o c — o E 7 3 0 o m L 06 3 _ o 0_ Q o 3 m m as @ a�i °c L m 7 u p m n a) a) is — a) o N n n 3 O o 3 m E @ C -o (6 p, °_ -O a) "O E a) N C N M. (0 N L a) a) O C T O a) w is 3 3 o (D 'v —• 3 m 2 ° n a) a ._ u o 3 ° 5 a) o w o Z a s c m o > _ •• o m p 7 v a) m ° L U O Q p C a 'O >. a) d "6 "O p @ `p. c. a). o O c o- -Op a) n E o Q) C 'O O N Z as o c0 o m o E o 0 o o N E a) a) E L O a) 0- 7 c H N n@ -o N N U O` 7 7 0_ C 0 OU n o a, a) Y "O a) N -p (0 E m O ,n 7 c o N o -O ct 0 a E m o o n a� @ au) .� a L E u) m n > > m co m `° �° 0 5 3 c" 1 (I) (n _ o c L 3 as as 0 m = n - .N o n m O �° `a) c c n n 0 V) >. n 3 L ° °) c m m > g) .0 a) Q ° - N ° c0i o ° 9 C > 8 E 0 W 0_ a) L — 0 0 N (UO o L c c .r U • N @ -O V O .N @ = 3 T .° 0 (n C UO co N C aa)) c o N X > as (o a) a°i as (0 E 3 7 a) o U m CO 0 • m a = a) -o a) <0 — C 0 as m (0 U c • W C 3 U U U N m 0 0 0 .U. N U � O c U a) O O — (0 "0 m ui 0' E .3 as .0 .U.� `) U. -O U • m N O O O .0 .� m m � n ° N °. ° "70 @ H H H O' Q > - a a Y a c 'E N ns ai a`) a .0 m a) -a o. a 0 a`) (ca a) 3 m o o 0 2 2 m a (6 -oo a = 0 0 .0 o °- a) m co a) CO o a ✓ c 0_ J D U) tt 0 0 0_ 0_ U Q a z U <n U U U U Q = ¢ 0 Co M U ') 2 a a cn o 0 CO ILI n O N M V Cr' (0 h Co O O N M V Co O r Co O O N M V CL) O r Co O T. 0 .— N co tt co O I-- co 0) ° M .1 N N N F. N N N N N N c`) C) C1) M M M (`•) C) C) c�•) d O d O a) O a) �X O C 16 N_ N N_ U Q CO iF cn C 0 Lo 8) 0 In 0 _'- 0 N a O O ` -co O a) E J N N a) m o I U i▪u 0 E a °- O a Q c 0. —1 a 0 ° Q U a Q >18 CL W , TO 0) 0- N .N a) o `o m - _ 7 To c Q c 0 a) `0 > L w (I) o c E O a) CA O a` n o O L 0 co L o) M c 7 w CO 'r-- N v 3 u_ C O ~ E z a D a r v° Q m w 3 no O rn a as D Cr) a • ao co tL c co o a) o c N • N o = co 0 co To Z ° a) -di Y aQ c X • Z a5 no w m 2 a w 0 a a a a a a a a a a a a a a a a a N N N N N CO CO CO N N N N E E E E - E E E E E E E E E E E E Q °) °) ° ° ° °) ° °) ° ° °) °) Q Q Q Q C c c c C C C C C C C C C C c c ° Q Q Q Q m a Z r r r >- r r r r r r r r Z Z Z Z • z Z Z Z Z F N `o (n Lv a) c a) U N 0 CO TO C a) — 0 c E 3 — E a) 0 0 N O O _ c a O 7 >4 N U. Cl). a O C L O L .N (n xt 0 C > 7 E o 1 ° CD E _ 3 0 a o O O O CO N U 0 0 c C ` 0 a) O O a) 1 a) E O ° w IL N co co Q m O a) E N O > 0 O N U I (0 °U LL LL J 7 c _ > O) N O' C 'O N a 4• "O O Q N N OL '° °) a0 N N w N `O 7 CO E C N a a) C > O N:t-' q - 3 0 ° CO N N n i o = n 30 o N Q c 0 7 ° % L a o 7 0 o o a O 7 N M U L O) U co N N 7 3 N� p 'C 0) C °ts C N o «O LM 7 Q N N N N co c a) O Z E E c -o c c .E (r -(2 m o M c o 0• '- H CO c° o N a N C c ` N !u) a ° a U C O a) N T = Y o o -c ) O m o c. Q 30 0 m ° �j 'n o ai a .n 3. o > .. • co _0 p U a) C C T O 7 0 ° 0 CO .co Y C6 —°. o O m .0 '@ C Q .m co -0"T o o) o m C) U U a) a o o c E - Z 0 E 3 0 2 a) L m 3 '� a) a• Q N C - CO (CO (LO D. d O L L -0 (D ° '70 E N aS _ C C N N C,•) N N t o o aNi o 0 3 0 .0 T 3 c .cn W Z a) N N m 3 3 a) oc0i c 0 a N a«-) 3 ° a °� u0i a - m o 3 °� o o E O O 2 c .0 "6 "O CO 112 °. 73 0 (0 E 0 c O 0 O O C O" `O V N '06 N N a O 01 C "O Q N 3 a) c E a 'D a5 N al O a) a) Y a) O _ E E E L O a) N c w o F N a -o N _- U 7 = a C V C-) OU a 0 a) a) -O a) N -O CO E O) O F. 7 c O ci, -0 E L0 ((0 E m o 0 o a) m a N u) m t c N o a c0 N m a) °o o >, — 3 = c .N u) o a o c 0 0 To O �° m .S n n N >, h a) a) 3 c • -0 0) c 0- 0- a• `> c c@ = 7 O. -C @ o c7) 0 0 0 c >, a) WIT. m - -° •o -o U c as -0L a) To •y m a) > m L a) N N U L C N C E a a) a) a) co 0 L c c .. Y U C a3 -° -° 0 N - 3 'a o N C o N (6 c a) C (6 CO X a�oi 3 0 as as C . c� c� E CO 3 D0 > o U O 03 O � a _ 0 a E = _U m N ° c c a) U U U N @ O O N U co °, C. U o O O a) -o a) N O- E •'3 C .U. U -° U Cl) m N o 0 0 0 .° .� m m a —° a ° 7o m r F F a o > g a a .Y Y °(0 5 E a) ,, m. .44 a) Q9 •E ) a� a a a m a� m W 3 2 0 0 a 2 2' 2 m as m -oo = O O r O a 0 0 CO 'a) aa)) o O ai to• mc a_ _I D co • O O a a o Q a z o co o o c> o a w a w a m m o N 2 a s cn coo a W °- O N M V (f) CO f� W 6) O N M V IL) (O 1� W CA O N M V In CO f: W 0) ✓ EO ,- N M V 1n CO I,- CO O N N N N N N N N N N M C) C) C) C) C') (`•) C) C) C) U O O w� 0 O a) N O a) Y.• O c N (6 N U C W o co" 3- c 3- o N O co c3 _ co co .a.I N y c c a) E W- ,c c ` 0 C� o dIQ E. a Q w a C) a Q 0 }