Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout169-045 9952, 10032, 10150, 10220 2049 By Grace Christianson at 12:49 pm, Oct 03, 2025 Digitally signed by Sean McLaughlin (4311) DN: cn=Sean McLaughlin (4311) Date: 2025.10.03 12:18:30 - 08'00' Sean McLaughlin (4311) 325-603 10-407 *Variance as per 20 AAC 25.112(i): Approved for alternate abandonment plug placement on parent well contingent upon cement plug in motherbore and/or fully cemented liner on upcoming sidetrack. A.Dewhurst 15OCT25J.Lau 10/29/25 10/29/25 To: Alaska Oil & Gas Conservation Commission From: Trevor Hyatt Drilling Engineer Date: October 3, 2025 Re:J-03 Sundry Request Sundry approval is requested to set a whipstock in the J-03 wellbore as part of the drilling and completion of the proposed J-03A CTD lateral. Proposed plan: Prior to drilling activities, screening will be conducted to drift for whipstock and MIT. Coil will cement the 4-1/2"x9- 5/8" tubing tail annulus (for dual string exit). E-line will set a 4-1/2" packer whipstock. If unable to set the whipstock pre-rig, the rig will perform that work. See J-03A PTD request for complete drilling details - A coil tubing drilling sidetrack will be drilled with the Nabors CDR2 or CDR3 rig. The rig will move in and test BOPE. If unable to pre-rig, the rig will set the 4-1/2" packer whipstock and mill a 4-1/2"x9-5/8" dual string 3.80" window + 10' of formation. The well will kick off drilling in the Ivishak Zone 4 and lands in Zone 2. The lateral will continue in Zone 4, 3 and 2 to TD. The proposed sidetrack will be completed with a 3-1/2"x3-1/4"x2-7/8” 13Cr solid liner, cemented in place and selectively perforated post rig (will be perforated with rig if unable to post rig). This completion will completely isolate and abandon the parent Prudhoe Pool perfs. 20 AAC 25.112(i) Variance Request: Hilcorp requests to plug the existing perforations via the liner cement job, packer whipstock and/or liner top packer, if the liner lap pressure test fails as an alternate plug placement. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current wellbore and proposed sidetrack is attached for reference. Pre-Rig Work: (Estimated to start in November 2025) 1. Slickline : Dummy WS drift 2. Coil : Set cement retainer at ~9,800' MD. Squeeze 4-1/2" x 9-5/8" IA at KOP (below production packer), by pumping ~38 bbls of 15.8ppg cement tubing tail in place in preparation for dual string exit. Target TOC 9,250' MD. 3. E-Line : Set 4-1/2" Packer Whipstock at 9,760’ MD at 180 degrees ROHS 4. Fullbore : MIT-IA and/or MIT-T to 2,500 psi (min) 5. Valve Shop : Pre-CTD Tree Work 6. Operations : Remove wellhouse and level pad. Rig Work: Reference J-03A Permit submitted in concert with this request for full details. 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,378 psi). Give AOGCC 24hr notice prior to BOPE test. 2. Mill 3.80” Dual String 4-1/2"x9-5/8" Window 3. Drill build section: 4.25" OH, ~454' (25 deg DLS planned). 4. Drill production lateral: 4.25" OH, ~1,960' (12 deg DLS planned). Swap to KWF for liner. 5. Run 3-1/2” x 3-1/4” x 2-7/8” 13Cr solid liner 6. Pump primary cement job*: 35 bbls, 15.3 ppg Class G, 1.24 (ft3/sk), TOC at TOL. Set LTP*. If high losses are encountered during cement job and it is deemed necessary, a cement down squeeze from TOL to loss zone will be performed with the rig or service coil (if performed by service coil see future sundry). 7. Only if not able to do with service coil extended perf post rig – Perforate Liner with 1-1/4" CS Hydril 8. Freeze protect well to a min 2,200' TVD. 9. Close in tree, RDMO. * Alternate plug placement variance request per 20 AAC 25.112(i) Post Rig Work: 1. Valve Shop : Valve & tree work 2. Slickline : Set LTP* (if necessary). Set live GLVs. 3. Service Coil : Post rig RPM and perforate (~30’) - see extended perf procedure attached. 4. Testing : Portable test separator flowback. Trevor Hyatt CC: Well File Drilling Engineer Joe Lastufka 907-223-3087 TOC ~9,250' Well Date Quick Test Sub to Otis - Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular CL Annular Bottom Annular CL Blind/Shears CL Coiled Tubing Pipe / Slips Kill Line Choke Line CL BHA Pipe / Slip CL Coiled Tubing Pipe / Slips TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level CDR#-AC BOP Schematic CDR Rig's Drip Pan Fill Line Normally Disconnected HP hose to Micromotion LP hose open ended to Flowline (optional) Hydril 7 1/16" Annular Blind/Shear CT Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross CT Pipe/Slips BHA Pipe / Slips nneeeeeceeeeeeeeeeeeeeeeeeeeeeeeeeeeeee Kaitlyn Barcelona Hilcorp North Slope, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: kaitlyn.barcelona@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By:Date: DATE: 10/13/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL PBU J-03 (PTD 169-045) RPM 07/17/2021 RPM Carbon Oxygen Analysis 07/07/2021 OmniView 3-Phase Saturation Analysis 0717/2021 Please include current contact information if different from above. Received By: 10/13/2021 37' (6HW By Abby Bell at 2:48 pm, Oct 13, 2021 Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:169-045 6.50-029-20025-00-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 10356 9886 8850 9019 9952 9886 8093 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 86 30" 22 - 108 22 - 108 Surface 2049 20" 22 - 2071 22 - 2071 1530 520 Intermediate 2459 13-3/8" 1948 - 4447 1948 - 4244 3090 1540 Production 10314 9-5/8" 20 - 10334 20 - 9231 6870 4760 Perforation Depth: Measured depth: 9681 - 10080 feet True vertical depth:8674 - 9015 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13cr85 18 - 9836 18 - 8807 9019 8093Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker Hyd S3 Packer Liner 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 1121254570248 0 36310 Well Not Online 0 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Wyatt Rivard wrivard@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.777.8547 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon …Plug Perforations 5 Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9250 Sundry Number or N/A if C.O. Exempt: N/A No SSSV installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Cut Tubing tail Operations shutdown … Change Approved Program 5 N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028281 PBU J-03 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Meredith Guhl at 2:54 pm, Sep 10, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.09.10 14:30:10 -08'00' Stan Golis (880) RBDMS HEW 9/10/2021 SFD 9/10/2021MGR14OCT2021DSR-9/13/21 ACTIVITY DATE SUMMARY 8/5/2021 **WELL S/I ON ARRIVAL** DRIFTED w/ 3.73" SWAGE, TEL & S.BLR LOCATED WLEG @ 9923'SLM(9916'MD) *-7' C/F* TAGGED TD @ 10039'SLM(10032'MD) **WELL S/I ON DEPARTURE** 8/7/2021 T/I/O= 1900/0/X Load TBG ( Perforation). Pumped 233 bbls crude down TBG for load. Hang tags, notify Pad-op. FWHP's = T=0 I=0 O=X 8/7/2021 ***WELL SHUT IN ON ARRIVAL*** (TUBING CUT) MIRU ELINE ATTEMPT TO CUT TUBING AT 9836' ***JOB CONTINUES ON 08AUG21 WSR*** 8/8/2021 ***JOB CONTINUES FROM 07AUG21 WSR*** (TUBING CUT) MIRU ELINE CUT TUBING AT 9836'. TOOLSTRING STUCK AT JET CUT. RIG UP T-BIRD PUMPING, TOOLSTRING FREED AND THEN E-LINE TOOLSTRING STUCK AT X- NIPPLE AT 9052. PULLED OUT OF WEAK POINT AND RECOVERED ALL WIRE. RDMO ELINE ****LEFT IN HOLE: 1.44" RS, 1.69" WT BAR, 2.0" WT BAR, 1.57" CCL, 2.73" CENTRALIZER, 1.92" SHOCK SUB, 3.625" JET CUTTER, OAL: 20.17', MAX OD: 3.63"**** TOP of fish: 9032MD ***JOB COMPLETE*** 8/8/2021 T/I/O=0/0/0 ASSIST E-LINE (PERFORATING) Pumped 10 bbls 50/50 down TBG followed by 33 bbls Crude. Pumped 5 bbls 50/50 spear, followed by 142 bbls KCL with 5 bbls 50/50 tail. Pumped 54 bbls crude down TBG to assist E-line POOH. FWHP's T/I/O= 0/0/0 E-line on well upon departure. 8/17/2021 ***WELL S/I ON ARRIVAL*** RECOVER ELINE TOOL STRING LEFT IN WELL ON 8/8/21. FISHED ELINE TOOL STRING @ 9038' SLM. LOCATED TUBING TAIL @ 9839' SLM TAGGED TUBING STUB @ 9949' SLM (+7' correction). GOOD IMPRESSION OF CUT TUBING. ***JOB COMPLETE*** 8/28/2021 ***WELL SHUT IN UPON ARRIVAL*** RUN 1: SET BOTTOM OF PLUG AT 9915', TOP OF PLUG AT 9900', BASKET OF PLUG AT 9912', CCL OFFSET = 27.0', CCL STOP DEPTH = 9888.0' RUN 2: DUMP BEADS AND CASING CLEANER 10' ABOVE TOP OF PLUG. RUN 3: DUMP 18" OF CEMENT ON TOP OF PLUG, ESTIMATED TOP OF CEMENT AT 9010.0' ***JOB IN PROGRESS*** 8/29/2021 ***JOB CONTINUED FROM 28-AUG-2021*** RUN 4: TAGGED TOP OF CEMENT AT 9909', DUMP 3' OF CEMENT. ESTIMATED TOP OF CEMENT AT 9906' RUN 5: DUMP 3' OF CEMENT, ESTIMATED TOP OF CEMENT AT 9903' RUN 6: DUMP 3' OF CEMENT, ESTIMATED TOP OF CEMENT AT 9900' RUN 7: DUMP 3' OF CEMENT, ESTIMATED TOP OF CEMENT AT 9897 ***JOB IN PROGRESS***' Daily Report of Well Operations PBU J-03 Daily Report of Well Operations PBU J-03 8/30/2021 ***JOB CONTINUED FROM 29-AUG-2021*** RUN 8: TAGGED TOP OF CEMENT AT 9893.0', DUMP 3' OF CEMENT, ESTIMATED TOP OF CEMENT AT 9890.0'. OE GOOD WITH CEMENT TOP. DECISION MADE TO NOT RUN LAST BAILER AND RIG DOWN. RECOMMENDED TO WAIT 72 HOURS BEFORE FLOWING WELL, MININUM 24 HOURS BEFORE PT PLUG. 9/6/2021 ***WELL SHUT IN ON ARRIVAL*** (JOB SCOPE:ADPERF 10' 2.875'' 6 spf GEO RAZOR CHARGES) PERF INTERVAL 9861' TO 9871' TOOL TAG TOC AT 9886.4', LOG CORRELATE WITH BAKER RPM LOG DATED 17-JULY-2021 PULL INTO POSITION. CCL STOP DEPTH=9853.2' MD, ' CCL OFFSET TO TOP SHOT = 7.8' MD. TOTAL LENGH FROM CCL TO BOTTOM NOSE 18.4' ***WELL SHUT IN ON DEPARTURE*** V � • • O N C O N a) 6 7 0 U 0 (J v, > N O 4111 r OA }' F- > 0 2 c6 r6 0 o. N a) Y O 6 > Q Y O O C -0 I- It 0 r6 Y ra a Q Q C r6 O Q W W LLI N N V7 u J In r Ln co O E L GO H r a) o) a a a " v o Y v) }r- N 0 7 7 Wo) d 000 L C C c6 r c� 2e4 fn W Q Q m m N 0 0 0 E Y r6 t/1 Qea - i.. OD O h OO 6 N 4 N 'O Q ,H Z F- Y Q N N c N a) > N 2 00- 0 0 a u Y Y 0 0 0 0 0 0 0 0 * Vs Q W J J J J J J J J 06 s_ U } 0 W W W W W W W W 000 0 at 0 p ^r F- LL LL LL LL LL LL LL LL t a) E -p N QJ CO - Q Q Q Q Q Q Q Q ❑. 'Q YO c6 0 =O ,..,.co a z z z z z z z z cu -O cil LL LL LL LL LL LL LL LL -0cu u a-.)) c Y 76 Y > Y 0 Y W a) a) ° O .� V CO 0 0 0 -0 0 m ..r O F- @ v v .V4 a > > 0 O CC C r6 O v (Ci V N Q GJ t u > m vi > > > a) .0 0p , min224tx �nw daz• o6 U w. 7 0 « ° a O � Z' i`® al os w 0 --] c*,,,-)it 112,...Virip . I1 Zu 65 4.w aaaaaaaa 2mmmmmm mm AL awIll wwww ww 4,y z00000000 r., O x x x x x x x x --) 0 0 0 0 0 0 0 0 a) w > LL d' cercw ccd' d' d'aaaa0- a as ss.11 ..?, fC YYYY yyX y� Win M f0 O 0 M x i.-7, 0 €- 0 N 00 01 01 0 0 0 0 0 CO0 G CO P. 0 M f�'�. V V,( 0 0 0 0 0 0 0 0 0 o U1 V p O O O O O O Oal u o N 0 0 0 U ao :— al i c� rc > N m aaax LL cIo E < �' w V 00 0 U Oen 0 H ;ai on az . ® a `0 0 0 0 0 00 m 0 0 0 0 0 0 0 0 o c N CV al M N O O N (00 M ' +, Q .,. # r0 O GO 00 CD 00 O in 76 -p n O O O N C) Y > r. p_ NC?N N N N N N m N Q T O O) O) O T O O E 0 N N N N N N N N rn Q1 0 0 0 0 Co 0 0 0 C 0 ` - 0 0 0 0 0 0 0 0 113 0 10 N V') 1() IL) N N Nc 4... w CO CO C CO c a N w F E a) o CO W }g++! LC p w w V I O O) Y A (O�(o0D IOM\ Z N c N ,-.`sl e} C r cc ramo CL Q a N r "� 0 N o E z u J �n �X+ v a V C/:1 a d 0 0 0 c LLJ in Q) c a F`- a a ° m STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMM111)N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing I3 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 4 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well l l Re-enter Susp Well 0 Other:Cement OA Q 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number 169-045 3. Address: P.O.Box 196612 Anchorage, Development II Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number 50-029-20025-00-00 7. Property Designation(Lease Number): ADL 0028281 8. Well Name and Number PBU J-03 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: USIT PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: J.1.,.. =3",D Total Depth: measured 10356 feet Plus ���4, :: 9 measured None feet true vertical 9250 feet Junk measured 10032',10150', 10220' feet OCT 12015 l Effective Depth: measured 10291 feet Packer measured 9021 feet true vertical 9194 feet Packer true vertical 8095 feet AO (3 CC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural 85 30" 23-108 23-108 Conductor 2049 20" 22-2071 22-2071 2320/1530 1500/520 Surface Intermediate 2499 13-3/8" 1948-4447 1948-4244 3090/3450 1540-1950 Production 10314 9-518"x10-3/4" 20-10334 20-9231 Liner Perforation Depth: Measured depth: 9980-10080 feet True vertical depth: 8930-9015 feet Tubing(size,grade,measured and true vertical depth) 4-1/2",12.6#,13Cr85 16-9919 16-8878 (5006 Packers and SSSV(type,measured and 4-1/2"Baker S-3 Packer 9021 8095 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: Cut&Pull 7",26#,N-80 tubing from 9330'.Cut&Pull 10-3/4",55.5#,N-80 from 2235'.Cut and Pull 13-3/8",61#,K-55 from 1948'.Cut and Pull 16",65#,H-40 from 2003'.Run 9-5/8",47#, L-80 to 2238',cement w/605.1 Bbls,1.16 yield(2929 sx)Class'G'.Push fish(7",26#,N-80 x 5-1/2",17#,L-80 x 4-1/2",13.5#,A-95 tubing)to 10032'.Run 4-1/2",12.6#,13Cr85 tubing to 9919'. 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 0 0 Subsequent to operation: 0 0 0 0 0 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations p Exploratory ❑ Development p Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil ® Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 315-292 Contact McLaughlin,Sean M Email Sean.McLaughlin@bp.com Printed Name Joe Lastufk Title Drilling Technologist Signature Phone +1 907 564 4091 Date YO/2415 Form 10-404 Revised 5/2015 177"1- 1012 x'115 RBDMStCT Z 31015 l°AI /,i Submit Original Only • S J-03, Well History (Pre-Rig Workover) T/I/O/OO/000=SSV/50/150/0/0, Temp=Sl. PPPOT-T(PASS), PPPOT-IC (PASS). Pre RWO. PPPOT-T: Stung into test void (0+ psi), bled to 0 psi. Monitored for 10 min, no increase in pressure. Functioned LDS, all moved freely(1.75"). Single port, unable to pump through void. Pressured void to 5000 psi for 30 min test, lost 100 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. Fluid returns were small, suspect internal check is still installed. PPPOT-IC: 1/2" plug installed on main test port, Alemite fitting installed on test port between double"P" secondary seals. Unable to remove 1/2" plug until IAP &OAP are bled to 0 psi. Stung into secondary test void (0+ psi), bled to 0 psi. Monitored for 10 min, no increase. Pressured void to 3500 psi for 30 min test, lost 0 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled to 0 psi. The primary seal was not tested but this will give the rig a barrier for a 5/10/2015 BOP test. ****WELL S/I ON ARRIVIAL**** RAN 2-7/8 GS CORE W/ EQ PRONG TO 9,467'SLM/9,468'MD PULLED 2-7/8"XX-PLUG @ 9,467'SLM/9,468'MD 6/25/2015 ***CONTINUE WSR ON 6/26/15*** ***CONTINUE WSR FROM 6/25/15*** DRIFTED W/2.25"CENT., 15' 2.25" BAILER, SNORKEL BOTTOM TO 10,050' SLM 6/26/2015 ***WELL S/I ON DEPARTURE***(DSO NOTIFIED) T/I/O/OO/000 =250/10/100/0/0. Temp = SI. T& FL (Eval ice/water in cellar, Eline request). No AL. TBG FL @ 144'. Cellar has —26" of water. Note: Ordered vac truck. 6/26/2015 SV, WV, SSV= C. MV= 0. IA, OA = OTG. 1630. T/I/O/OO/000 =250/10/100/0/0. Temp = SI. Cellar watch (Eline). No AL. Monitor cellar during operation. Maintain IAP under 500 psi during pumping & bleed OAP as needed duringEline operations. 7/2/2015 ***Job continued on 7/3/15 WSR*** T/I/O = 2276/38/116 Assist E-Line with RPG Log (Pre- Rig) Loaded TBG with 5 bbls methanol 7/2/2015 and 612 BBL 1% KCL and Followed with 248 bbl Kcl for Logging. Continues on 7-3-2015 ***WELL SHUT IN ON ARRIVAL(HES ELINE: RPM LOG)*** UNPLANNED STANDBY DUE TO MISPLACED RAP LOAD AND KILL WELL USING 612 BBL KCL PUMPED BY LRS PERFORM 2 GASVIEW PASSES FROM TAG DEPTH AT 10073'TO 9535' PUMPING AT 0.5 BPM. PERFORM 1 C/O PASS FROM TAG DEPTH TO 9730' PUMPING AT 0.5 BPM 7/2/2015 ***JOB CONTINUED ON 3-JUL-15*** ***JOB CONTINUED FROM 7/2/15 WSR*** Cellar watch (Eline). No AL. Monitor cellar during operation. Maintain IAP under 500 psi during pumping & bleed OAP as needed during Eline operations. No change in cellar during operations. See log for details. Final WHP's = VAC/30/50/0+/0+. 7/3/2015 Haliburton in control of valves upon departure. ***JOB CONTINUED FROM 2-JUL-15***(RPM LOG) FINISH 3 CIO PASSES FROM TAG AT 10073' TO 9735'WHILE PUMPING AT 0.5 BPM REPEAT GASVIEW PASSES FROM 9800' TO 9530' DUE TO GAS SEEN IN INTERVAL ON FIRST TWO PASSES RIG DOWN E LINE 7/3/2015 ***JOB COMPLETE -WELL LEFT SHUT IN, HANDED BACK TO DSO*** • S J-03, Well History (Pre-Rig Workover) ***WELL S/I ON ARRIVAL***(pre-rwo). SET 2.313"XX PLUG (3 x 3/16 EQZ hole, 3 x 1/8 EQZ holes, 18" FILL EXT, OAL= 39"), @ 9478' MD 7/3/2015 ***CONTINUE ON WSR 7-4-15*** Continues from 7-2-2015 Assist H. E Line [RPM log] Pumped a total of 303 bbl 1% Kcl to maintain the kill while E-Line Logged then pumped 98 bbl Crude to Freeze Protect TBG, 7/3/2015 RDMO, E-Line in Control of well Upon Departure FWHP= 1/20/87 ***JOB CONTINUED FROM 2-JUL-15*** (HES ELINE: HOIST/BAKER ATLAS: RPM LOG) FINISH 3 C/O PASSES FROM TAG AT 10073'TO 9730' WHILE PUMPING AT 0.5 BPM REPEAT GASVIEW PASSES FROM 9800'TO 9530' DUE TO GAS SEEN IN INTERVAL ON FIRST TWO PASSES RDMO 7/3/2015 ***JOB COMPLETE -WELL SHUT IN ON DEPARTURE, NOTIFIED DSO*** T/I/0=20/14/9 Temp=SI. Assist Slickline [Obj: Eval for RWO]. CMIT-TxIA to 2500 psi *****PASS**** Tbg and la lost 24/43 psi in 1st 15 min, and lost 17/18 psi in 2nd 15 min. for total losses or 41/61 psi in a 30 minute test. SlickLine will perform MIT-OA to 1200 psi ****PASS**** LRS Charted MIT results 1st 15 Min OA Lost 49 psi, 2nd 15 Min OA Lost 19 psi for a total loss of 64 psi over a 30 Miinute Test AFE sign and caution tags hung on well. 7/4/2015 Slickline in Control of well upon Departure , FWHP =493/591/0/0/0 ***CONTINUE FROM WSR 7-3-15***(Pre Rig) LRS PERFORM CMIT-T x IA TO 2500 PSI, GOOD TEST(See LRS log). PERFORMED PASSING MIT-OA TO 1,200psi (see Irs wsr). DRIFT W/6.05" GAUGE RING TO 7" OTIS SSSV NIPPLE @ 1,955' SLM / 1,984' MD (no issues). RAN 7" GR TO 7" OTIS SSSV NIPPLE @ 1,955' SLM / 1,984' MD (see log for details). RAN 6.05" GAUGE RING TO 7" OTIS SSSV NIPPLE @ 1,955' SLM / 1,984' MD (see log for details). RAN 5.14" CENT TO 7" CAMCO POGLM @ 3,989'SLM/4,013' MD (no issues). 7/4/2015 ***WELL S/I ON DEPARTURE***(pad op notified job complete, well &well head status). T/1/0/00/000 =SSV/11/9/1/2. Temp = SI. Cellar watch (assist Slick line). No AL. Monitor 7/4/2015 cellar during operation. Bleed OA if needed. See LRS &SLB S/L log's for MIT details. T/I/O/OO/000 = 320/270/0/5/0. Temp =SI. WHPs (Eval fluid in cellar). No AL. Oily fluid in cellar 8-10"deep taken © 12 o'clock position, 41"from top of grating (cellar has herculite containment). 7/8/2015 SSV, WV, SV = C MV= 0. IA/OA/OO/000 = OTG. NOVP 1500 ***WELL SHUT IN ON ARRIVAL*** (ELINE TUBING PUNCH AND RCT) RIH W/ ELINE TOOLS & 10'X 2"TUBING PUNCHER&SHOT TBG PUNCH HOLES © 3952' - 3962' RIH W/5000-200 RCT CUTTER(OD=5.0")AND CUT TBG @ 3942' 7/10/2015 ***JOB COMPLETE*** T/I/O= 156/231/4/0/0 Temp= SI ( Prep RWO ) Prep to CMIT T X IA.. ***Job 7/15/2015 continued on 07-16-15 AWGER;s ** T/1/0/00/000 =207/260/18/0/0. Temp=SI. Assist FB w/cellar watch (SC leak). No AL. Bled OAP to 0 psi in 1 min, fluid. Held open bleed on OA, OOA, 000A for duration of LRS pumping (See log for details). 7/16/2015 FB in control of well upon departure. 2250. T/I/O/OO/000=156/231/4/0/0. Temp=SI. Assist FB (Cellar watch). 000A© dead 0 psi & cemented to surface. Maintain open bleed on 000A for FB. Vac'd out 25 bbl fluid out of cellar. Job shut down due to leaking test port on TBG hanger. 7/16/2015 FB in control of well upon departure. 0245. i • J-03, Well History (Pre-Rig Workover) T/I/O = 207/260/18, Temp: SI Repair leaking alemite fitting (Complete) Stung into tubing alemite fitting, (0+ psi) bled void to 0 psi. Single port, unable to pump through void. PT test void to 5,000 psi, no leaks on alemite fitting. Bled void to 0 psi. RD manifold and 7/16/2015 installed new alemite cap &tightened. Monitored for 10 minutes. Leak mitigated. ***Job Continued from 07/15/15 WSR *** CMIT T X IA ( Pre RWO ) Pump down TBG 9.08 bbls diesel to 3448 psi . Alemite fitting starts to weep, Bleed down to beginng pressures, Bled back 9.98 bbls. Pumped 10 bbls of diesel to reach test pressure, 1st 15 min T/IA lost 6/5 psi, 2nd 15 min T/IA lost 4/4 psi, for a total loss of 10/9 psi in a 30 min test**PASS** CIRC- OUT-- Line up to pump down TBG up IA to Flowline of JX-02. Spear in with 5 bbls methanol followed by 290 bbls 1% KCL followed by 213 bbls diesel, F/P hardline then let well U-tube for 2 hrs... All hardline 1/4 turn valves closed , ( JX-02 Valves =WV,SV,SSV= C , MV=O, IA and OA =OTG) J-03 valves WV,SV,SSV= C , MV = 0 , IA,OA, OOA, 000A= OTG 7/16/2015 Notified Operater of Well Status FWHP's = 3/ 11/-2/0/0 T/I/O/UOO/LOO = SSV/VAC/VAC/12/0+. Temp =SI. WHPs (post MIT). Unable to open SSV due to disconnected inverter in boxvan. 7/20/2015 SV, WV, SSV= C. MV= 0. IA, OA= OTG. 2359. 8/7/2015 On standby for Scheduling T/I/O=0/0/0. Pump Tubing to 200/300 PSI.Set TWC#423. TWC DID NOT PASS LTT. Left in 8/8/2015 hole. RDMO Job in progress. See log for details. Final T/I/O=TWC/250/0 T/I/O=TWC/200/0. RU Dry Hole Conversion. Install 6"Temp#22. Torque Flanges PT Tree. RU Temp Piggyback IA#79. Torque Flanges Pt IA.Bleeed to OPSI RDMO ***Job in 8/9/2015 Progress***See Log For Details. Final T/I/O=TWC/0/0 T/I/O =TWC/0/0/0/0. Temp = SI. WHPs (Pre Rig). Well is demobed. 8/12/2015 SV= C. MV=0. IA, OA, OOA, 000A = OTG. 00:40. T/I/O/00/000=TWC/0/0/0/0. Pre Doyon 16. Install 3" OA piggyback block valve. PT to 3500 8/13/2015 psi. Passed. Final WHP's TWC/0/0/0. ***Job Complete***See log. • • North America-ALASKA-BP Page 1 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 8/14/2015 18:00 - 00:00 6.00 MOB P PRE PREPARE RIG T/MOVE OFF OFF PAD -REMOVE MATTING FROM UNDER AND AROUND RIG(USED AS LANDINGS DUE TO RIG ELEVATION) -LAY MATTING F/RIG T/MANUVER RIG AWAY FROM WELL ROW -REMOVE BOP FROM CELLAR ON CRADLE -INSTALL BOOSTER WHEELS ON THE FRONT AND REAR OF RIG -STAGE UP TO MOVE OFF OF F PAD 8/15/2015 00:00 - 04:00 4.00 MOB P PRE MOVE RIG FROM F PAD T/J PAD 04:00 - 06:00 2.00 MOB P PRE REMOVE REAR BOOSTER WHEELS,BACK OVER BOP STACK AND CRADLE,REMOVE STARWARS AND FRONT BOOSTER WHEELS, PREP T/BACK OVER WELL,RAISE DERRICK AND SECURE ACCEPT RIG g 06:00 AM 08/15/2015 06:00 - 07:00 1.00 MOB P PRE LAY MATS,SPOT AND SHIM RIG OVER WELL 07:00 - 10:00 3.00 RIGU P PRE R/U CELLAR,BRIDLE DOWN,SPOT MODS INTO PLACE AROUND RIG,TAKE ON 8.5PPG FLUID 10:00 - 11:00 1.00 RIGU P PRE RIG EVAC DRILL AND AAR W/WSL,PUSHER, CREW -PRE-SPUD W/VENDORS AND TOWN TEAM _ 11:00 - 12:00 1.00 DHB P PRE TEST TWC F/ABOVE AND BELOW T/250PSI LOW,3500PSI HIGH F/5 MINS EACH NO PUMP OPS THIS TOUR,OBBLS LOSSES AT NOON OA=OPSI,OOA=0 PSI,000A=OPSI 12:00 - 13:30 1.50 DHB P PRE CONTINUE T/TEST TWC F/BELOW T/250PSI LOW,3500PSI HIGH F/5 MINS EACH 13:30 - 16:30 3.00 RIGU P PRE N/D DRYHOLE TREE AND ADAPTER -CAMERON BLEED ADAPTER VOID/HANGER SEAL CONTROL LINES,DRAIN TREE -INSPECT HANGER THREADS,UNABLE TO M/U X-OVER DUE T/CORROSION -FUNCTION LDS(6-1/2"OUT AND 4-7/8"IN) 16:30 - 19:00 2.50 RIGU P PRE NIPPLE UP BOPE,MOUSE HOLE,HOLE FILL RISER,KOOMEY LINES,CHOKE/KILL HOSES 19:00 - 21:30 2.50 RIGU P PRE CHANGE OUT UPPER RAMS T/7"FIXED AND INSPECT LOWER 3-1/2"X 6"RAMS -OPEN AND INSPECT DOOR SEALS,SERVICE MUD CROSS AND CHOKE MANIFOLD 21:30 - 22:30 1.00 BOPSUR P PRE R/U BOPE TEST EQUIPMENT,FILL STACK AND PERFORM BODY TEST T/INSPECT SEALS (GOOD TEST) 22:30 - 00:00 1.50 BOPSUR P PRE TEST BOPE W/4",4.5",AND 7"TEST EQUIPMENT T/250PSI LOW,3500PSI HIGH,F/ 5 CHARTED MINS EACH AOGCC REP JEFF JONES WAIVED WITNESS TO TESTING NO PUMP OPS THIS TOUR,0 LOSSES T/THE WELLBORE OA=OPSI,OOA=0 PSI,000A=OPSI Printed 10/12/2015 10:49:36AM 11, • North America-ALASKA-BP Page 2 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 8/16/2015 00:00 - 02:30 2.50 BOPSUR P PRE CONTINUE T/TEST BOPE W/4",4.5"AND 7" TEST JNTS,T/250PSI LOW,3500PSI HIGH,F/ 5 MINS EACH. AOGCC REP JEFF JONES WAIVED WITNESS TO THE TEST 02:30 - 03:30 1.00 BOPSUR P PRE BLOW DOWN AND R/U TEST EQUIPMENT 03:30 - 05:00 1.50 WHSUR P DECOMP R/U DUTCH RISER AND DSM LUBRICATOR AND PRESSURE TEST T/250PS1 LOW, 3500PSI HIGH F/5 MINS EACH,PULL TWC, R/D EQUIPMENT 05:00 - 07:30 2.50 PULL P DECOMP CIRCULATE OUT DIESEL FREEZE PROTECT BACK T/FLOW BACK TANK -PUMP 84BBLS DOWN IA @ 6BPM,550PSI, REVERSE AND PUMP 183BBLS DOWN THE TBG @ 6BPM,480PSI -MONITOR WELL F/10MINS,STATIC,8.5PPG IN AND OUT 07:30 - 08:30 1.00 PULL P DECOMP BLOW DOWN LINES,R/D MANIFOLD,HOOK KILL LINE TO STACK AND PT T/250PSI LOW, 3500PSI HIGH F/5 MINS EACH 08:30 - 09:30 1.00 PULL P DECOMP R/U HES SPOOLER,M/U SAFETY JOINT AND FLOOR VALVE,M/U BOT SPEAR AND DRAIN STACK 09:30 - 10:00 0.50 PULL P DECOMP ENGAGE TBG HANGER W/BOT SPEAR -CAMERON BOLDS 10:00 - 11:00 1.00 PULL P DECOMP PULL HANGER T/THE FLOOR,CLOSE ANNULAR ELEMENT AND CIRC B/U THROUGH CHOKE -HANGER PULLED FREE @ 135KLBS,PUW= 130KLBS -B/U CIRC=156BBLS THROUGH CHOKE @ 110PSI -MONITOR WELL F/10MINS NO-FLO,MW= 8.5PPG IN AND OUT 11:00 - 12:00 1,00 PULL P DECOMP TERMINATE CONTROL LINES,B/O BOT SPEAR,UD HANGER,R/U 7"CSG EQUIPMENT -BLOW DOWN CHOKE,KILL,AND TOP DRIVE LOSSES T/WELLBORE @ NOON=OBBLS,OA, OOA,000A,=OPSI,8.5PPG MW IN AND OUT 12:00 - 14:00 2.00 PULL P DECOMP L/D 7"26#,N-80 TBG 1X1 F/3900'MD W/DUAL ENCAPSULATED CONTROL LINE -18 RUBBER VERSA CLAMPS RECOVERED 14:00 - 15:00 1.00 PULL N RREP DECOMP ADJUST ROLLERS ON PIPE SKATE 15:00 - 19:00 4.00 PULL P DECOMP CONTINUE T/POOH W/7"26#,N-80 TBG 1X1 T/1962'MD -UD 7"SSSV,R/D SPOOLING UNIT,REMOVE F/RIG FLOOR 19:00 - 19:30 0.50 PULL P DECOMP PERFORM D-1 DRILL(90SEC)T/SECURE WELL,PLACE SHEARABLE PIPE ACROSS THE BOP STACK,(6MINS) -CONDUCT AAR Printed 10/12/2015 10:49:36AM • North America-ALASKA-BP Page 3 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB©57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 22:00 2.50 PULL P DECOMP CONTINUE T/L/D 7"26#,N-80 TBG 1X1 F/ 1962'MD T/SURFACE -98 FULL JOINTS RECOVERED,1 SSSV W/ PUPS,18 CLAMPS,AND 1 CUT JNT 5.5'LONG (7.05"OD) =3928'MD PIPE OUT OF HOLE BASED ON TALLY -50%OF ENCAPSULATED LINE RUBBER COATING MISSING F/LINE 22:00 - 22:30 0.50 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR 22:30 - 00:00 1.50 PULL P DECOMP DRAIN STACK,FUNCTION BOP RAMS, JOHNNY WACK BOP STACK T/REMOVE ANY RUBBER DEBRIS,BREAK DOWN FLOOR VALVE AND SAFETY JOINT LOSSES T/WELLBORE©MIDNIGHT=OBBLS, OA,OOA,000A,=OPSI,8.5PPG MW IN AND OUT 8/17/2015 00:00 - 00:30 0.50 RIGU P DECOMP SERVICE AND INSPECT RIG FLOOR AND PIPE SKATE EQUIPMENT 00:30 - 05:00 4.50 RIGU P DECOMP RIH W/4"DP 1X1 F/PIPE SHED T/2,552'MD, POOH W/4"DP STANDING BACK IN DERRICK 05:00 - 06:30 1.50 EVAL P DECOMP R/U SLB E-LINE T/PERFORM USIT LOG 06:30 - 10:00 3.50 EVAL P DECOMP RIH W/CMT LOG TOOLS T/3,900'MD AND LOG T/SURFACE 10:00 - 11:00 1.00 EVAL P DECOMP R/D E-LINE 11:00 - 12:00 1.00 RIGU P DECOMP LOAD AND M/U HES 9-5/8"RBP RIH T/114'MD LOSSES T/WELLBORE=OBBLS,OA,OOA, 000A,=OPSI,NO PUMPS THIS TOUR 12:00 - 14:00 2.00 RIGU P DECOMP RIH W/RBP ON 4"DP T/2,419'MD -SEAWATER WEIGHT:8.5 PPG IN,8.5 PPG OUT -P/U=73K,S/0=75K -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 14:00 - 15:30 1.50 DHB P DECOMP SET RBP AS PER HES REP©2,423'MD -R/U AND P/T RBP T/250PSI LOW,2500PSI HIGH F/5MINS 15:30 - 17:00 1.50 DHB P DECOMP POOH 100'ABOVE RBP TO 2,323'MD -BLOW DOWN TOP DRIVE&KILL LINE -R/D CIRC LINES 17:00 - 22:30 5.50 DHB P DECOMP DUMP 50',42 SACKS OF RIVER SAND ON TOP OF RBP 22:30 - 00:00 1.50 DHB P DECOMP DISPLACE WELL FROM 8.5 SEAWATER TO 9.8 PPG BRINE -25 BBL HIGH VIS PILL SPACER,3 BPM,50 PSI -9.8 PPG BRINE AT 6 BPM,50 PSI -MONITOR WELL FOR 10 MINUTES:WELL STATIC -OBTAIN SPRS LOSSES T/WELLBORE=OBBLS,OA=120 PSI,OOA,000A,=OPSI,SPR#1 30 STKS=40 PSI,40 STKS=90 PSI 8/18/2015 00:00 - 00:30 0.50 DHB P DECOMP RIG SERVICE -LUBRICATE RIG Printed 10/12/2015 10:49:36AM 4111 • North America-ALASKA-BP Page 4 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/me:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UW:500292002500 Active datum:J-03 OKB©57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) — _ (usft) 00:30 - 02:00 1.50 DHB P DECOMP POOH WITH RBP RUNNING TOOL FROM 2,376' MD TO SURFACE -MONITOR WELL FOR 10 MINUTES:WELL STATIC -RIH AND TAG TOP OF SAND AT 2,376'MD -BRINE WEIGHT:9.8 PPG IN,9.8 PPG OUT -MONITOR WELL FOR 10 MINUTES BEFORE PULLING NON SHEARABLES ACROSS STACK WELL STATIC -L/D HES RBP RUNNING TOOL -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 02:00 - 04:30 2.50 BOPSUR P DECOMP CHANGE OUT UPPER PIPE RAMS FROM 7"TO 10-3/4" -DRAIN STACK -CLOSE BLINDS -BARRIERS FOR RAM CHANGEOUT:TUBING PLUG,RBP,KWF -STACK CONFIGURATION:3-1/2"X 6"VBRS, MUD CROSS,BLIND RAMS,10-3/4"RAMS, 13-5/8"ANNULAR 04:30 - 09:30 5.00 BOPSUR P DECOMP N/D BOPE AND TUBING SPOOL. -CAMERON REPRESENTATIVE CLEAN AND INSPECT CASING SPOOL. -REMOVE FROM SPOOL FROM CELLAR. 09:30 - 12:00 I 2.50 WHSUR P DECOMP N/U 13-5/8"DRILLING SPOOL AND 13-5/8" FOUR PREVENTOR BOPE. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 9.8 PPG BRINE. OA=0 PSI NO SLOW CIRCULATING RATES. 12:00 - 14:30 2.50 WHSUR P DECOMP PJSM.PRESSURE TEST DRILLING SPOOL BREAKS AND UPPER RAMS. -R/U PRESSURE TESTING EQUIPMENT. -REVIEW PRESSURE CROSSCHECK WITH CREW.ALL CHALLENGE QUESTIONS ANSWERED CORRECTLY. -PRESSURE TEST DRILLING SPOOL BREAKS AND 10-3/4"FIXED RAMS TO 250 PSI LOW, 2,500 PSI HIGH FOR(5)CHARTED MINUTES. GOOD TEST. 14:30 - 15:30 1.00 BOPSUR P DECOMP R/D 10-3/4"TEST EQUIPMENT. -BLOW DOWN SURFACE LINES. 15:30 - 17:00 1.50 CUT P DECOMP PJSM.M/U BAKER MULTI-STRING CUTTER BHA#2. -RIH FROM SURFACE TO 15'MD. 17:00 - 19:30 2.50 CUT P DECOMP RIH WITH BAKER MULTI-STRING CUTTER BHA #2. -RIH FROM 15'MD TO 2,230'MD AND LOCATE COLLAR.PUW=70 KLBS,SOW=74 KLBS. -PLACE CUTTER ON DEPTH AT 2,235'MD. -ACQUIRE SLOW CIRCULATING RATES. 19:30 - 20:00 0.50 CUT P DECOMP CUT 10-3/4"CASING AT 2,235'MD. -PUMP AT 6 BPM=470 PSI,80 RPM,TORQUE =3.5 FT-KLBS.GOOD INDICATION OF CUT,OA PRESSURE ROSE FROM 0 PSI TO 240 PSI. Printed 10/12/2015 10:49:36AM • North America-ALASKA-BP Page 5 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code j NPT NPT Depth 1 Phase Description of Operations (hr) (usft) 20:00 - 21:00 1.00 CUT P DECOMP PJSM.CIRCULATE DIESEL INTO 10-3/4" ANNULUS. -PUMP 25 BBLS OF DIESEL AT 3 BPM=280 PSI WITH LRS. -CLOSE ANNULAR AND OPEN OA TO FLOWBACK TANK. -PUMP 25 BBLS OF 9.8 PPG DEEP CLEAN BRINE AT 3 BPM=540 PSI. 21:00 - 22:00 1.00 CUT P DECOMP ALLOW DIESEL TO SOAK IN OA FOR 1 HOUR. 22:00 - 22:30 0.50 CUT P DECOMP CONTINUE CIRCULATE 130 BBLS OF 9.8 PPG BRINE OUT TO FLOWBACK TANK UNTIL RETURNS ARE CLEAN AT SURFACE. -OPEN ANNULAR AND CLOSE OA TAKING RETURNS TO PITS AND CIRCULATE BOTTOMS UP AT 10 BPM=140 PSI. -SHUT DOWN AND MONITOR WELL FOR(10) MINUTES.WELL STATIC. 22:30 - 00:00 1.50 CUT P DECOMP PJSM.POOH WITH BAKER MULTI-STRING CUTTER BHA#2. -POOH FROM 2,235'MD TO 400'MD.PUW= 56 KLBS,SOW=56 KLBS. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 9.8 PPG BRINE. OA=0 PSI 8/19/2015 00:00 - 00:30 0.50 CUT P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 00:30 - 01:00 0.50 CUT P DECOMP PJSM.POOH WITH BAKER MULTI-STRING CUTTER BHA#2. -POOH FROM 400'MD TO 15'MD. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 01:00 - 02:00 1.00 CUT P DECOMP PJSM.L/D BAKER MULTI-STRING CUTTER BHA#2. -POOH AND L/D FROM 15'MD TO SURFACE. -BLOW DOWN SURFACE LINES. 02:00 - 03:30 1.50 CUT P DECOMP PJSM.M/U BAKER SPEAR BHA#3. -SPEAR INTO 10-3/4"CASING. 03:30 - 08:30 5.00 CASING P DECOMP PJSM.SPLIT BOPE STACK ABOVE SPOOL -ATTEMPT TO PULL CASING SLIPS FREE. WELLHEAD MOVING UP 4-5",SLIPS WOULD NOT COME FREE. -APPLY STEAM TO WELLHEAD AND HOLD TENSION. -STAGE PULL UP TO 375 KLBS AND ATTEMPT TO WORK CASING FREE. -CALL ODE AND DISCUSS OPTIONS. DECISION MADE TO PERFORM MSC BELOW WELLHEAD ON 10-3/4"CASING. 08:30 - 09:30 1.00 CASING P DECOMP RELEASE AND L/D BAKER SPEAR BHA#3. 09:30 - 10:00 0.50 BOPSUR P DECOMP PJSM.ND BOPE STACK AND SET BACK ON STUMP. Printed 10/12/2015 10:49:36AM North America-ALASKA-BP Page 6 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/me:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 12:00 2.00 CUT P DECOMP PJSM.CUT 10-3/4"CASING BELOW CASING SPOOL. -STAGE VAC TRUCK TO VACUUM OUT CELLAR BOX OF RETURNS. -M/U AND RIH WITH BAKER MSC BHA#4 TO CUT 10'BELOW CASING SPOOL AS PER BAKER REPRESENTATIVE.PUMP AT 6.5 BPM 770 PSI,RPM=80,FREE TORQUE=1.5 FT-KLBS.ONCE CUT,10-3/4"CASING SPOOL ROSE 4-1/2". -POOH AND L/D BAKER MSC BHA#4. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 9.8 PPG BRINE. OA=0 PSI,OOA=0 PSI,000A=0 PSI. NO SLOW CIRCULATING RATES. 12:00 - 13:00 1.00 CUT P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK PJSM.REMOVE 10-3/4"CASING SPOOL. -REVIEW PROCEDURE AND WRITE UP THA. 13:00 - 19:00 6.00 WHSUR P DECOMP REMOVE OA VALVE FROM 10-3/4"CASING SPOOL. -R/U HYDRA LIFT AND BREAK OUT FLANGE BOLTS. -INITIAL COMPRESSIVE STRENGTH OF 13-3/8"CASING=236 KLBS. -ALL BOLTS REMOVED CASING SPOOL ROSE UP 11". -UD 10-3/4"CASING SPOOL AND 10'CUT JOINT. 19:00 - 20:30 1.50 WHSUR P DECOMP M/U AND RIH WITH BAKER SPEAR BHA#5. -CIRCULATE BOTTOMS UP AT 1-4 BPM= 200-550 PSI TAKING RETURNS TO CELLAR. 20:30 - 21:30 1.00 WHSUR P DECOMP PULL 10-3/4"CASING FREE AT250 KLBS. -L/D BAKER SPEAR BHA#5. 21:30 - 00:00 2.50 CASING P DECOMP PJSM.POOH AND UD 10-3/4"55.5#CASING TO PIPE SHED. -POOH FROM 2,235'MD TO 1,707'MD.PUW= 160 KLBS. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 9.8 PPG BRINE. OOA=0 PSI,000A=0 PSI. NO SLOW CIRCULATING RATES. 8/20/2015 00:00 - 04:30 4.50 CASING P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. PJSM.POOH AND UD 10-3/4"55.5#CASING TO PIPE SHED. -POOH 1,707'MD TO SURFACE. -RECOVERED:(54)JOINTS,UPPER CUT JOINT=7',LOWER CUT JOINT=5.9',(23) BOW SPRING CENTRALIZERS. 04:30 - 06:00 1.50 CASING P DECOMP R/D CASING EQUIPMENT. -CLEAR AND CLEAN RIG FLOOR. 06:00 - 08:00 2.00 CUT P DECOMP PJSM.M/U BAKER DRESS OFF BHA#6. -RIH FROM SURFACE 219'MD. Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 7 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 1X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. WWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 09:30 1.50 CUT P DECOMP RIH 1MTH BAKER DRESS OFF BHA#6. -RIH FROM 219'MD TO TOP OF STUB AT 2,235'MD. 09:30 - 10:30 1.00 CUT P DECOMP DRESS OFF 10-3/4"TUBING STUB. -PARAMETERS:PUW=83 KLBS,SOW=84 KLBS,ROT.WT.=85 KLBS,FREE TORQUE= 2.5 FT-KLBS,PUMP AT 3 BPM=60 PSI. MILL ON STUB WITH 2-5 KLBS WOB AS PER BAKER REPRESENTATIVE. -MILL UP 6"OF 10-3/4"CASING DOWN TO 2,235.5'MD. -SHUT DOWN AND MONITOR WELL FOR(10) MINUTES.WELL STATIC. 10:30 - 11:30 1.00 CUT P DECOMP POOH WITH BAKER DRESS OFF BHA#6. -BLOW DOWN TOP DRIVE. -POOH FROM 2,235'MD TO 219'MD. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 11:30 - 12:00 0.50 CUT P DECOMP PJSM.UD BAKER DRESS OFF BHA#6. -POOH FROM 219'MD TO SURFACE. -STAND BACK DRILL COLLARS. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 9.8 PPG BRINE. OA=0 PSI,OOA=0 PSI,000A=0 PSI. NO SLOW CIRCULATING RATES. 12:00 - 14:00 2.00 CUT P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. PJSM.BREAK AND UD BAKER BOOT BASKETS. -RECOVER MINIMAL METAL DEBRIS. -CLEAR AND CLEAN RIG FLOOR. 14:00 - 19:30 5.50 EVAL P DECOMP PJSM.R/U E-LINE TO PERFORM CEMENT LOG. -R/U CEMENT LOG TOOL ON RIG FLOOR AND FUNCTION TEST.ZERO AT RIG FLOOR. -RIH TO 2,215'MD AND LOG TO SURFACE AT 60 FPM. -DETERMINE TOC AT 2,020'MD AND DECISION MADE TO CUT AT 1,945'MD. -R/D E-LINE. 19:30 - 20:30 1.00 CUT P DECOMP PJSM.M/U BAKER CUTTER BHA#7. -RIH FROM SURFACE TO 18'MD. 20:30 - 22:30 2.00 CUT P DECOMP RIH WITH BAKER CUTTER BHA#7. -RIH FROM 18'MD TO 1,947'MD.PUW=70 KLBS,SOW=66 KLBS,4 BPM=180 PSI,3 BPM=90 PSI. -LOCATE 13-3/8"COLLAR AT 1,943'MD. -CONTINUE DOWN TO 1,948'MD TO MAKE CUT. Printed 10/12/2015 10:49:36AM I • North America-ALASKA-BP Page 8 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB©57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 00:00 1.50 CUT P DECOMP PJSM.CUT 13-3/8"CASING AT 1,948'MD. -PUMP AT 6 BPM=420 PSI,60 RPM,TORQUE =3-6 FT-KLBS. -CUT ON DEPTH FOR 45 MINUTES.TORQUE SPIKE AND STALL OUT INDICATING CUT. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 9.8 PPG BRINE. OOA=0 PSI,000A=0 PSI. NO SLOW CIRCULATING RATES. 8/21/2015 00:00 - 01:30 1.50 CUT P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. PJSM.CUT 13-3/8"CASING AT 1,948'MD. -NO INDICATION ON OOA OR 000A OF U-TUBE.NO FLUID DROP IN 13-3/8"CASING. -BAKER REPRESENTATIVE DETERMINED CUT MADE. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 01:30 - 03:00 1.50 CUT P DECOMP PJSM.POOH WITH BAKER CUTTER BHA#7. -POOH FROM 1,948'MD TO 18'MD. MONITOR WELL FOR(10)MINUTES.WELL STATIC. 03:00 - 03:30 0.50 CUT P DECOMP L/D BAKER CUTTER BHA#7. -POOH FROM 18'MD TO SURFACE. -UD BHA KNIVES INDICATE CUT. 03:30 - 06:30 3.00 CASING P DECOMP PJSM.M/U BAKER SPEAR BHA#8. -RIH AND ENGAGE SPEAR INTO 13-3/8" CASING. 06:30 - 11:00 4.50 CASING P DECOMP CAMERON SECURE SLIPS ON CASING. -ATTEMPT TO PULL 13-3/8"CASING FREE. UNSUCCESSFUL. -PUMP AT 2-5 BPM=300-500 PSI. -WORK CASING AND ESTABLISH RETURNS THROUGH 16"X 20"ANNULAR. -CIRCULATE 255 BBLS 9.8 PPG BRINE. 11:00 - 12:00 1.00 CASING P DECOMP SET 13-3/8"CASING BACK IN SLIPS AT 160 KLBS. -L/D BAKER SPEAR BHA#8. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 9.8 PPG BRINE. OOA=0 PSI,000A=0 PSI. NO SLOW CIRCULATING RATES. 12:00 - 13:30 1.50 CASING P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. PJSM.M/U BAKER CUTTER BHA#9. -RIH FROM SURFACE TO 19'MD. 13:30 - 14:00 0.50 CUT P DECOMP RIH WITH BAKER CUTTER BHA#9. -RIH FROM 19'MD TO 1,600'MD.LOCATE COLLAR. Printed 10/12/2015 10:49:36AM • North America-ALASKA-BP Page 9 of 50 Operation Summary Report Common Well Name:J-03 'AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 16:00 2.00 CUT P DECOMP PJSM.CUT 13-3/8"CASING. -ESTABLISH PARAMETERS:PUW=63 KLBS, SOW=65 KLBS,ROT.WT.=65 KLBS,FREE TORQUE=2 FT-KLBS,RPM=60,6 BPM=500 PSI. -CUT 13-3/8"CASING AT 1,635'MD AS PER BAKER REPRESENTATIVE. -NO U-TUBE UP OOA OR 000k DISCUSS OPTIONS WITH ODE. 16:00 - 18:30 2.50 CUT P DECOMP PJSM.POOH WITH BAKER CUTTER BHA#9. -POOH FROM 1,635'MD TO 119'MD. -LOCATE COLLAR AT 119'MD,RIH 5'TO CUT AT 124'MD. -ESTABLISH PARAMETERS:PUW=45 KLBS, SOW=45 KLBS,ROT.WT.=45 KLBS,FREE TORQUE=1.5 FT-KLBS,RPM=60,7 BPM= 710 PSI. 18:30 - 19:00 0.50 CUT P DECOMP POOH WITH BAKER CUTTER BHA#9. -POOH FROM 124'MD TO 76'MD. 19:00 - 19:30 0.50 CUT P DECOMP L/D BAKER CUTTER BHA#9. -POOH FROM 76'MD TO SURFACE. 19:30 - 20:00 0.50 CUT P DECOMP PJSM.M/U BAKER SPEAR BHA#10. -RIH AND SPEAR INTO 13-3/8"CASING AT WELLHEAD. 20:00 - 23:00 3.00 CUT P DECOMP POOH WITH 13-3/8"CASING. -CAMERON REPRESENTATIVE RECOVER SLIP SEGMENTS. -PULL TO FLOOR AND UD BAKER SPEAR BHA #10.PUW=50 KLBS,SOW=50 KLBS. -RECOVERED:(2)JOINTS,(2)CUT JOINTS= 5.33',15.89'. 23:00 - 00:00 1.00 FISH P DECOMP PJSM.M/U BAKER SPEAR BHA#11. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 9.8 PPG BRINE. OOA=0 PSI,000A=0 PSI. NO SLOW CIRCULATING RATES. 8/22/2015 00:00 - 00:30 0.50 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 00:30 - 01:00 0.50 FISH P DECOMP PJSM.RIH WITH BAKER SPEAR BHA#11. -RIH FROM SURFACE TO 124'MD. 01:00 - 03:00 2.00 FISH P DECOMP PJSM.ENGAGE TOP OF 13-3/8"FISH AT 124' MD. -PERFORM PRE-JAR DERRICK INSPECTION. -BEGIN JARRING AT40 KLBS AND WORK UP TO 90 KLBS OVER STRING WEIGHT. -INSPECT TOP DRIVE EVERY 15 HITS. -FREE AT 225 KLBS,—90 KLBS OVER STRING WEIGHT. -PUW=137 KLBS,SOW=133 KLBS. 03:00 - 03:30 0.50 FISH P DECOMP CIRCULATE 170 BBLS OF 9.8 PPG BRINE AT 7 BPM=90 PSI. -RECIPROCATE PIPE WHILE CIRCULATING. -SHUT DOWN AND MONITOR WELL.WELL STATIC. 03:30 - 04:30 1.00 FISH P DECOMP PJSM.POOH AND L/D BAKER SPEAR BHA#11. -POOH FROM 124'MD TO SURFACE. -L/D SPEAR ASSEMBLY AND CUT JOINT. -TOP CUT JOINT=34.46'. Printed 10/12/2015 10:49:36AM S North America-ALASKA-BP Page 10 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/me:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB©57.26usft(above Mean Sea Level) Date From-To Hrs Task Code i NPT NPT Depth ! Phase Description of Operations (hr) (usft) 04:30 - 05:00 0.50 FISH P DECOMP R/U 13-3/8"CASING EQUIPMENT ON RIG FLOOR. 05:00 - 09:30 4.50 FISH P DECOMP PJSM.POOH WITH 13-3/8"CASING. -L/D 13-3/8"TO PIPE SHED. -RECOVERED:(38)JOINTS,(15)BOW SPRINGS,(1)CUT JOINT=10.32'. 09:30 - 10:00 0.50 FISH P DECOMP CLEAR AND CLEAN RIG FLOOR. -R/D CASING EQUIPMENT. 10:00 - 12:00 2.00 FISH P DECOMP PJSM.M/U BAKER SPEAR BHA#12. -RIH FROM SURFACE TO 265'MD. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 9.8 PPG BRINE. OOA=0 PSI,000A=0 PSI. NO SLOW CIRCULATING RATES. 12:00 - 12:30 0.50 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 12:30 - 13:00 0.50 FISH P DECOMP PJSM.RIH WITH BAKER SPEAR BHA#12. -RIH FROM 265'MD TO 1,635'MD.PUW=75 KLBS,SOW=78 KLBS. !13:00 - 14:00 1.00 FISH P DECOMP ENGAGE 13-3/8"CASING. —RIH AND ENGAGE FISH AND NO-GO IN AT 1,648'MD. -SET DOWN 20 KLBS AND WORK PIPE. -FISH FREE AT 110 KLBS,PUW=105 KLBS, SOW=95 KLBS. -CIRCULATE BOTTOMS UP AT 7 BPM=200 PSI.TOTAL STROKES=1,500. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 14:00 - 15:00 1.00 FISH P DECOMP PJSM.POOH WITH BAKER SPEAR BHA#12 AND 13-3/8"CASING. -POOH FROM 1,648'MD TO 265'MD. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 15:00 - 17:00 2.00 FISH P DECOMP L/D BAKER SPEAR BHA#12. -POOH FROM 265'MD TO SURFACE. 17:00 - 18:30 1.50 FISH P DECOMP POOH WITH 13-3/8"CASING. -POOH FROM 600'MD TO SURFACE. -RECOVERED:(7)JOINTS,(2)CUT JOINTS= 28.30',5.09'. 18:30 - 20:00 1.50 FISH P DECOMP R/D CASING EQUIPMENT. -CLEAR AND CLEAN RIG FLOOR. -CLEAN OUT AND WASH OUT CELLAR BOX. 20:00 - 22:00 2.00 WHSUR P DECOMP PJSM.CAMERON BLEED VOID. -N/D CASING SPOOL. 22:00 - 00:00 2.00 WHSUR P DECOMP PULL 20"X 20"CASING SPOOL. -STEAM SPOOL AND WORK FROM 5 KLBS TO 20 KLBS OVER.CAME FREE AT 20 KLBS OVER. -P/U AND REMOVE CASING SPOOL. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 9.8 PPG BRINE. 000A=0 PSI. NO SLOW CIRCULATING RATES. 8/23/2015 00:00 - 00:30 0.50 WHSUR P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 11 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Daterme:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB(g57.26usft(above Mean Sea Level) Date From-To Hrs Task Code . NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 04:00 3.50 WHSUR P DECOMP REMOVE STUDS AND BOLTS FROM WELLHEAD. -INSPECT PACK-OFF. -CLEAN WELL HEAD AND REMOVE ANNULAR VALVES. 04:00 - 06:00 2.00 CASING P DECOMP PJSM.M/U BAKER SPEAR BHA#13. 06:00 - 07:30 1.50 CASING P DECOMP CAMERON REPRESENTATIVE ATTEMPT TO REMOVE PACK-OFF FROM 16"CASING. UNABLE TO REMOVE. 07:30 - 08:30 1.00 CASING P DECOMP RIH AND SPEAR INTO 16"CASING AT WELLHEAD. -PULL 16"CASING AND WELLHEAD LIFTED OFF OF 20"CONDUCTOR.UNABLE TO PULL 16"CASING OUT OF CASING SPOOL. -SET BACK DOWN. -RELEASE SPEAR AND L/D BHA#13. 08:30 - 10:00 1.50 CUT P DECOMP PJSM.M/U BAKER CUTTER BHA#14. 10:00 - 11:00 1.00 CUT P DECOMP RIH WITH BAKER CUTTER BHA#14. -RIH 10'BELOW WELLHEAD.PUW=43 KLBS, SOW=43 KLBS,FREE TORQUE=2 FT-KLBS, RPM=60,3 BPM=90 PSI. -ATTEMPT TO CUT 16"CASING AS PER BAKER REPRESENTATIVE 10'BELOW WELLHEAD. -16"CASING BACKED OFF AT FIRST COLLAR BELOWATTEMPTED CUT. 11:00 - 11:30 0.50 CUT P DECOMP L/D BAKER CUTTER BHA#14. 11:30 - 12:00 0.50 FISH P DECOMP M/U BAKER SPEAR BHA#15. -RIH AND ENGAGE 16"CASING AT WELLHEAD. -PULL 16"CASING AND CASING HANGER FREE. -SET DOWN AND RELEASE SPEAR. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 9.8 PPG BRINE. NO SLOW CIRCULATING RATES. 12:00 - 13:00 1.00 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. PJSM.REMOVE CASING SPOOL FROM CELLAR. 13:00 - 15:00 2.00 FISH P DECOMP RIH WITH BAKER SPEAR BHA#16. -RIH TO 10'MD AND ENGAGE FISH. -ATTEMPT TO PULL FREE,WORK FROM 100 KLBS TO 285 KLBS.PUMP AT 7 BPM=60 PSI. -RELEASE SPEAR FROM 16"CASING,L/D BHA#16. -DISCUSS OPTION WITH TOWN TEAM. 15:00 - 16:00 1.00 CUT P DECOMP PJSM.M/U BAKER CUTTER BHA#17. 16:00 - 17:30 1.50 CUT P DECOMP RIH WITH BAKER CUTTER BHA#17. -RIH FROM SURFACE TO 1,005'MD AND LOCATE COLLAR.PUW=55 KLBS,SOW=57 KLBS. 17:30 - 19:00 1.50 CUT N RREP DECOMP CHANGE OUT 0-RINGS ON TOP DRIVE SWIVEL PACKING. Printed 10/12/2015 10:49:36AM I North America-ALASKA-BP Page 12 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Daterme:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB©57.26usft(above Mean Sea Level) Date From-To Hrs Task Code : NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 20:00 1.00 CUT P DECOMP FROM COLLAR AT 1,005'MD P/U TO 1,002'MD TO MAKE CUT ON 16"CASING. -5 BPM=300 PSI,ROT.WT.=55 KLBS,FREE TORQUE=2 FT-KLBS,RPM=60. -GOOD INDICATION OF CUT VIA TORQUE TRENDS. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 20:00 - 20:30 0.50 CUT P DECOMP POOH WITH BAKER CUTTER BHA#17. -POOH FROM 1,002'MD TO 77'MD. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 20:30 - 21:30 1.00 CUT P DECOMP L/D BAKER CUTTER BHA#17. -CLEAR AND CLEAN RIG FLOOR. 21:30 - 22:00 0.50 FISH P DECOMP PJSM.M/U BAKER SPEAR BHA#18. 22:00 - 22:30 0.50 FISH P DECOMP RIH WITH BAKER SPEAR BHA#18. -RIH FROM SURFACE AND SPEAR INTO 16" CASING AT 57'MD. -SET DOWN 10 KLBS TO VERIFY. -PULL FREE AT 90 KLBS. 22:30 - 23:00 0.50 FISH P DECOMP POOH WITH BAKER SPEAR BHA#18 AND FISH. -POOH FROM 57'MD TO SURFACE. 23:00 - 23:30 0.50 FISH P DECOMP L/D BAKER SPEAR BHA#18. 23:30 - 00:00 0.50 FISH P DECOMP R/U CASING EQUIPMENT ON RIG FLOOR. -INSTALL FALSE TABLE AND BRING 16"RIG TONGS TO RIG FLOOR. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 9.8 PPG BRINE. NO SLOW CIRCULATING RATES. 8/24/2015 00:00 - 00:30 0.50 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 00:30 - 07:00 6.50 FISH P DECOMP PJSM.POOH AND UD 16"65#H-40 CASING. -RECOVERD:(24)JOINTS,(1)CUT JOINT= 30.87',(12)CENTRALIZERS. 07:00 - 07:30 0.50 FISH P DECOMP R/D CASING EQUIPMENT. -CLEAR AND CLEAN RIG FLOOR. 07:30 - 09:00 1.50 FISH P DECOMP PJSM.M/U BAKER SPEAR BHA#19. -RIH FROM SURFACE TO 233'MD. 09:00 - 10:00 1.00 FISH P DECOMP RIH WITH BAKER SPEAR BHA#19. -RIH FROM 233'MD TO 1,000'MD.PUW=65 KLBS,SOW=70 KLBS. -PUMP AT 8 BPM=140 PSI,RIH AND ENGAGE CASING STUB AT 1,004'MD. 10:00 - 11:00 1.00 FISH P DECOMP PJSM.PERFORM PRE-JAR INSPECTION IN DERRICK. -PULL FISH FREE AFTER(3)JAR HITS.PUW= 120 KLBS,SOW=125 KLBS. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 13 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date.9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB©57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:00 1.00 FISH P DECOMP PJSM.POOH WITH BAKER SPEAR BHA#19 AND 16"CASING. -POOH FROM 1,004'MD TO 233'MD. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 9.8 PPG BRINE. NO SLOW CIRCULATING RATES. 12:00 - 12:30 0.50 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 12:30 - 13:30 1.00 FISH P DECOMP PJSM.UD BAKER SPEAR BHA#19. -POOH FROM 266'MD TO SURFACE. -RELEASE SPEAR. -CLEAN AND CLEAR RIG FLOOR. 13:30 - 14:00 0.50 CASING P DECOMP R/U 16"CASING EQUIPMENT ON RIG FLOOR. 14:00 - 22:00 8.00 CASING P DECOMP PJSM.POOH AND L/D 16"CASING. -POOH FROM—1,000'MD TO SURFACE. -RECOVERED:(24)JOINTS,(1)CUT JOINTS= 3',(12)CENTRALIZERS. -BOTTOM OF LAST 16"JOINT DAMAGED AND FLAIRED. 22:00 - 23:00 1.00 CASING P DECOMP R/D CASING EQUIPEMENT. -CLEAR AND CLEAN RIG FLOOR. 23:00 - 00:00 1.00 CASING P DECOMP LID BAKER SPEAR BHA#19. 8/25/2015 00:00 - 01:00 1.00 WHSUR P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 01:00 - 05:00 4.00 WHSUR P DECOMP PJSM.N/U WELLHEAD. -INSTALL 20"X 20"CASING HEAD. -INSTALL 20"X 20"CASING SPOOL. -INSTALL 20"X 13-5/8"CASING SPOOL. 05:00 - 09:00 4.00 BOPSUR P DECOMP PJSM.N/U FOUR PREVENTER 13-5/8"BOPE STACK. -CHANGE OUT UPPER RAMS TO 9-5/8"FIXED RAMS. 09:00 - 10:30 1.50 BOPSUR P DECOMP R/U TEST EQUIPMENT. -M/U TEST SUBS TO TEST JOINTS. -SERVICE MUD CROSS AND CHOKE MANIFOLD. 10:30 - 11:30 1.00 BOPSUR P DECOMP PJSM.PERFORM BOPE BODY TEST. -FILL BOPE AND PERFORM BODY TEST, GOOD TEST. -CHANGE OUT(1)NEEDLE VALVE. 11:30 - 12:00 0.50 BOPSUR P DECOMP ACCUMULATOR DRILL AND AAR WITH CREW. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 9.8 PPG BRINE. NO SLOW CIRCULATING RATES. 12:00 - 13:00 1.00 BOPSUR P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 14 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB©57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 18:00 5.00 BOPSUR P DECOMP PJSM.TEST FOUR PREVENTER 13-5/8"BOPE AND RELATED EQUIPMENT. -TEST BOPE ACCORDING TO AOGCC REGULATIONS,DOYON AND BP PROCEDURES. -TEST ANNULAR WITH 4"TEST JOINT TO 250 PSI LOW,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST UPPER 9-5/8"FIXED RAMS WITH 9-5/8" TEST JOINT TO 250 PSI,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST LOWER 3-1/2"X 6"VARIABLE RAMS WITH 4"AND 4-1/2"TEST JOINT TO 250 PSI, 3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST BLIND RAMS,FLOOR VALVES,AND CHOKE MANIFOLD TO 250 PSI,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST WITH FRESH WATER. -PERFORM ACCUMULATOR DRAW DOWN TEST WITH WSL PRESENT. JOHNNIE HILL OF AOGCC WITNESSED FOR BOPE TEST. 18:00 - 19:30 1.50 BOPSUR P DECOMP R/D TEST EQUIPMENT. -DRAIN STACKAND BLOW DOWN LINES IN CELLAR. -P/U RUNNING TOOL AND PULL TEST PLUG. 19:30 - 22:00 2.50 CLEAN P DECOMP PJSM.M/U BAKER CLEAN OUT BHA#20. -RIH FROM SURFACE TO 71'MD AND HARD TAG.M/U TOP DRIVE AND ROTATE DOWN THROUGH 20"CASING. -RIH FROM 71'MD TO 246'MD. 22:00 - 23:00 1.00 CLEAN P DECOMP RIH WITH BAKER CLEAN OUT BHA#20. -RIH FROM 246'MD TO 1,854'MD. 23:00 - 00:00 1.00 CLEAN P DECOMP PJSM.SLIP AND CUT 75'OF DRILLING LINE. -INSPECT BREAKS. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 9.8 PPG BRINE. NO SLOW CIRCULATING RATES. 8/26/2015 00:00 - 01:00 1.00 CLEAN P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. PJSM.CONTINUE TO SLIP AND CUT DRILLING LINE. -SERVICE DRAWWORKS. 01:00 - 01:30 0.50 CLEAN P DECOMP PJSM.RIH WITH BAKER CLEAN OUT BHA#20. -RIH FROM 1,854'MD TO 1952'MD. Printed 10/12/2015 10:49:36AM S North America-ALASKA-BP Page 15 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT ' NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 02:30 1.00 CLEAN P DECOMP PJSM.ESTABLISH PARAMETERS.UP WT= 80K,DOWN WT=84K,ROT WT=81K. -ACQUIRE SLOW CIRCULATING RATES. -FREE TORQUE @ 10 RPM=1000 FT/LBS. PUMPING @ 7 BPM/110 PSI. -TAG OBSTRUCTION @ 2021'.SET DOWN 5- 10 K W/ACCOMPANYING OVER PULLS TO 15K TO GET FREE. -ATTEMPT TO ROTATE THRU,STALLING OUT 3000 FT/LBS OF TORQUE.UNABLE TO GET THRU.OVER PULLING TO GET FREE,10-15K. -NOTIFY TOWN ODE AND GET PERMISSION TO POOH AND PICK UP BULL NOSE AND STRING MILL. -SUSPECT DAMAGED 13 3/8"COLLAR© 2023'ISH FROM DROPPED 16". 02:30 - 04:00 1.50 CLEAN P DECOMP PJSM.BLOW DOWN TOP DRIVE. -POOH AND STAND BACK DRILL PIPE F/2021' -246'. -MONITOR WELL,WELL STATIC,9.8 PPG BRINE IN AND OUT. 04:00 - 05:30 1.50 CLEAN P DECOMP PJSM.LAY DOWN DRESS OF MILL. -INDICATIONS OF BEING IN A RESTRICTED ID. -MAKE UP BULL NOSE/STRING MILL BHA. 05:30 - 07:30 2.00 CLEAN P DECOMP PJSM.RIH W/STRING MILL ASSEMBLY. -RIH TO 1930'.ESTABLISH PARAMETERS.80K UP WT,82K DOWN WT,ROTATING WT=81K. -FREE SPIN TORQUE=1500 FT/LBS(30 RPM. 07:30 - 09:00 1.50 CLEAN P DECOMP PJSM.TAG TIGHT SPOT @ 2021'PUMPING 7 BPM/300 PSI,30 RPM/3-7K FT/LBS OF TORQUE IN TIGHT AREA. -WORK UP AND DOWN(6)TIMES,OK.RIH AND LIGHTLY TAG TOP OF 10 3/4"CASING 2235'. 09:00 - 10:30 1.50 CLEAN P DECOMP PJSM.BLOW DOWN TOP DRIVE.POOH. -POOH F/2235'-244'.MONITOR WELL,WELL BORE STATIC.9.8 PPG BRINE IN AND OUT. 10:30 - 12:00 1.50 CLEAN P DECOMP PJSM.LAY DOWN BULL NOSE/STRING REAMER ASSEMBLY. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 9.8 PPG BRINE. NO SLOW CIRCULATING RATES. 12:00 - 13:00 1.00 CLEAN P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. DOYON MANAGEMENT MEETING WITH ANDREW HONEA. 13:00 - 14:00 1.00 CLEAN P DECOMP PJSM.M/U BAKER DRESS OFF BHA#22. -RIH FROM SURFACE TO 246'MD. 14:00 - 15:00 1.00 CLEAN P DECOMP RIH WTH BAKER DRESS OFF BHA#22. -RIH FROM 246'MD TO 1,940'MD.ROTATE THROUGH TOP OF 13-3/8"CASING TO 1,955' MD. -RIH FROM 1,955'MD TO 2,233'MD.PUW=82 KLBS,SOW=85 KLBS. Printed 10/12/2015 10:49:36AM • S North America-ALASKA-BP Page 16 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB i57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:00 - 16:00 1.00 CLEAN P DECOMP DRESS OFF 10-3/4"CASING. -PARAMETERS:RPM=60,5 BPM=150 PSI, ROT.WT.=84 KLBS,FREE TORQUE=1.5 FT-KLBS. -TAG STUB AT 2,235'MD AND DRESS DOWN TO 2,236'MD WITH WOB=2-3 KLBS. 16:00 - 18:30 2.50 CLEAN P DECOMP PUMP 40 BBL HI-VIS SWEEP AT 5 BPM=140 PSI. -RECIPROCATED PIPE WHILE PUMPING. -INCREASE PUMP RATE TO 8 BPM=320 PSI. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 18:30 - 20:30 2.00 CLEAN P DECOMP POOH WITH BAKER DRESS OFF BHA#22. -POOH FROM 2,235'MD TO 246'MD. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 20:30 - 22:30 2.00 CLEAN P DECOMP PJSM.UD BAKER DRESS OFF BHA#22. -POOH FROM 246'MD TO SURFACE. -CLEAN JUNK BASKETS AND RECOVERED 2 GALLONS OF METAL SHAVINGS. -CLEAR AND CLEAN RIG FLOOR. 22:30 - 00:00 1.50 CASING P DECOMP PJSM.R/U 9-5/8"CASING EQUIPMENT ON RIG FLOOR. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 9.8 PPG BRINE. NO SLOW CIRCULATING RATES. 8/27/2015 00:00 - 01:30 1.50 CASING P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. R/U 9-5/8"CASING EQUIPMENT. 01:30 - 10:00 8.50 CASING P DECOMP PJSM.RIH WITH 47#L-80 VAMTOP CASING. -USE JET LUBE SEAL GUARD THREAD COMPOUND. -BAKER LOK ALL BTC CONNECTIONS. -TORQUE TURN EACH CONNECTION TO 15,900 FT-LBS. -RIH FROM SURFACE TO 2,205'MD. 10:00 - 10:30 0.50 CASING P DECOMP ENGAGE 10-3/4"STUB(812235'.UP WT=125K, DOWN WT=129K. -M/U 9-5/8"CASING JOINT#52 ON TOP OF SPACE OUT PUPS. -ENGAGE TOP OF 10 3/4"STUB©2235'.SET DOWN 20K TO 2238'. -PICK UP 100 KLBS OVER STRING WEIGHT TO 225K ON WT INDICATOR. 10:30 - 11:30 1.00 CASING P DECOMP R/U SLB CEMENT LINES. -R/U HES CEMENT HEAD AND CROSSOVER TO 9-5/8"CASING. -WSLAND TOOLPUSHER OBSERVE WIPER PLUG INSTALLED IN CEMENT HEAD. 11:30 - 12:00 0.50 CASING P DECOMP PRESSURE TEST CASING. -PRESSURE TEST CASING TO 1,000 PSI FOR (5)MINUTES.GOOD TEST. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 9.8 PPG BRINE. NO SLOW CIRCULATING RATES. Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 17 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:OOAM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UW:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 12:30 0.50 CASING P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. PJSM.INFLATE ECP AS PER BAKER REPRESENTATIVE. -STAGE PRESSURE UP AND OBSERVE INFLATION START @ 1700 PSI. -HOLD 2,000 PSI ON CASING FOR(10) MINUTES. -BLEED OFF ALL PRESSURE AND PRESSURE UP,OPEN ES CEMENTER @ 3100 PSI. 12:30 - 14:00 1.50 CASING P DECOMP CIRCULATE WELLBORE CLEAN WITH HEATED 120°F 9.8 PPG BRINE. -PUMP AT 5 BPM=230 PSI PUMP TOTAL 355 BBLS. -HOLD PJSM FOR CEMENT JOB WITH WSL, TOOL PUSHER AND SLB. ,-TRUCK PUSHER,DRIVERS,ALL HANDS AND MUD MAN. -EMPHASIS ON GOOD COMMUNICATION, DOUBLE CHECKING ALL VALVE ALIGNMENTS. -REVIEWED DOYON PROCEDURE,PUMPING SCHEDULE AND PRESSURE CROSS CHECK LIST. -DRILL SITE OPERATOR NOTIFIED AND AREA SECURED FOR DURATION OF JOB. 14:00 - 18:00 4.00 CASING P DECOMP PJSM.PERFORM 9-5/8"CEMENT JOB TO SURFACE. -SLB FILL LINES WITH 10 BBLS H2O. -TEST SLB CEMENT LINES TO 250 PSI LOW, 4,000 PSI HIGH FOR(5)MINUTES.WSL VERIFY TRIP SETTINGS.GOOD TEST. -BEGINS MIXING CEMENT @ 1415 HRS. -RESET TRIPS ON SCHLUMBER PUMP FOR 3000 PSI,MECHANICAL PRV @ 5000 PSI. -PUMP 605 BBLS 15.8 PPG CLASS G CEMENT.AVERAGE RATE/PRESSURE=4-5 BPM/500-650 PSI. -MIXED 2952 SACKS,YIELD 1.16 -SHUT DOWN AND RELEASE HES CEMENT PLUG.CHASE W/10 BBLS FRESH WATER. DISPLACE W/9.8 PPG BRINE. -CEMENT RETURNS TO CELLAR W/125 BBLS DISPLACED. -SLB DISPLACE WITH 165.9 BELS TO BUMP PLUG.INCREASE PRESSURE TO 1,850 PSI TO SHEAR CLOSED ES-CEMENTER.GOOD ,INDICATION AT SURFACE OF ES-CEMENTER SHEAR. -CEMENT IN PLACE AT 17:37 HRS ON 08/28/2015.UCA INDICATES 500 PSI AFTER 25:37 HRS. -BLOW DOWN CEMENT LINES TO SLB, VERIFY NO FLOW UP 9-5/8"CASING FOR(10) MINUTES.WELL STATIC AFTER(10)MINUTES. 18:00 - 19:30 1.50 CASING P DECOMP R/D SLB CEMENTERS AND R/D CEMENT HEAD ON RIG FLOOR. 19:30 - 20:30 1.00 BOPSUR P DECOMP PJSM.N/D BOPE AND SPLIT STACK. -SET EMERGENCY SLIPS WITH 100 KLBS OVER. Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 18 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 !X4-010J0-E:(5.540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB©57.26usft(above Mean Sea Level) Date From-To Hrs Task • Code ' NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 22:30 2.00 BOPSUR P DECOMP PJSM.R/U WACHS CUTTER AND CUT 9-5/8" 47#L-80 CASING. -RECOVER CUT JOINT=30.50'. 22:30 - 00:00 1.50 BOPSUR P DECOMP REMOVE SPOOLS AND RACK BACK BOPE STACK AND SECURE. -REMOVE IA VALVE AND INSTALL BLANK FLANGE. -PREPARE AND INSTALL 9 5/8" SLIP LOCK CONNECTION AND STARTING HEAD.. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 9.8 PPG BRINE. NO SLOW CIRCULATING RATES. 8/28/2015 100:00 - 00:30 0.50 BOPSUR P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 00:30 - 05:00 4.50 WHSUR P DECOMP PJSM.N/U SLIP LOCK WELL HEAD. -CAMERON PRESSURE TEST SEALS TO 250 PSI LOW,3,500 PSI HIGH FOR(30)MINUTES. -RILDS ON WEAR BUSHING FOR MEASUREMENT.REMOVE WEAR BUSHING AND INSTALL TEST PLUG. -INSTALL 2ND I/A VALVE. 05:00 - 07:30 2.50 BOPSUR P DECOMP PJSM.N/U BOPE. -CHANGE OUT ADAPTER FLANGE TO 13-5/8" X 11". -CHANGE OUT UPPER RAMS TO 7"FIXED RAMS. -CHANGE OUT AIR BOOTS ON RISER. 07:30 - 11:00 3.50 BOPSUR P DECOMP PJSM.HEIGHTENED AWARENESS W/ REGARD TO OVERHEAD WORK. -CHANGE OUT UPPER PIPE RAMS TO 7" FIXED. -TEST©250/3500 PSI/5 MIN EACH/ CHARTED,GOOD TESTS. -RIG DOWN TEST EQUIPMENT. -PULL TEST PLUG AND SET 9 1/16"ID WEAR BUSHING. 11:00 - 12:00 1.00 CLEAN P DECOMP PJSM.M/U BAKER DRILL OUT BHA#23. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 9.8 PPG BRINE. NO SLOW CIRCULATING RATES. 12:00 - 13:00 1.00 CLEAN P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. PJSM.CONTINUE TO M/U BAKER DRILL OUT BHA#23. -RIH FROM SURFACE TO 258'MD. 13:00 - 14:30 1.50 CLEAN P DECOMP RIH WITH BAKER DRILL OUT BHA#23. -RIH FROM 258'MD TO 2,149'MD,HARD TAG ON CEMENT.PUW=75 KLBS,SOW=85 KLBS. Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 19 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 00:00 9.50 CLEAN P DECOMP PJSM.CONTROL DRILL CEMENT SHOE TRACT. -ESTABLISH PARAMETERS:RPM=90,5 BPM =180 PSI. -DRILL CEMENT FROM 2,149'MD TO 2,186' MD WITH WOB=2-3 KLBS. -DRILL ES-CEMENTER FROM 2,186'MD TO 2,190'MD WITH WOB=2-3 KLBS. -DRILL CEMENT FROM 2,190'MD TO 2,223' MD WITH WOB=7-8 KLBS.7 BPM=300 PSI. -DRILL FLOAT COLLAR FROM 2,223'MD TO 2,224'MD WITH WOB=3-4 KLBS.7 BPM=340 PSI. -DRILL THROUGH FLOAT COLLAR,NO CEMENT BELOW FLOAT COLLAR. -CONTINUE TO RIH FROM 2,224'MD TO 2,376' MD AND HARD TAG ON TOP OF SAND. -ACQUIRE SLOW CIRCULATING RATES. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 9.8 PPG BRINE. 8/29/2015 00:00 - 00:30 0.50 CLEAN P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-0-MATIC.OK. 00:30 - 01:30 1.00 CLEAN P DECOMP PJSM.DRY DRILL ON TOP OF CEMENT. -DRILL FROM 2,376'MD TO 2,381'MD FOR 10 MINUTES WITH WOB=5 KLBS,60 RPM, TORQUE=2.5 FT-KLBS. -P/U TO 2,351'MD AND CIRCULATE 20 BBLS SWEEP AT 11 BPM=540 PSI. -MONITOR WELL FOR(10)MINUTES.WELL STATIC,MUD WEIGHT=9.8 PPG IN AND OUT. 01:30 - 03:00 1.50 CLEAN P DECOMP PJSM.POOH WITH DRILL OUT BHA#23. -POOH FROM 2,351'MD TO 258'MD. -MONITOR WELL FOR(10)MINUTES.WELL STATIC,9.8 PPG BRINE IN AND OUT. 03:00 - 04:00 1.00 CLEAN P DECOMP PJSM.UD BAKER DRILL OUT BHA#23. -POOH FROM 258'MD TO SURFACE. -UD DRILL OUT BHA. 04:00 - 06:00 2.00 CLEAN P DECOMP PJSM.M/U BAKER RCJB BHA#24. -RIH FROM SURFACE TO 238'MD. 06:00 - 08:30 2.50 CLEAN P DECOMP PJSM.RIH TO 2322'. -ESTABLISH PARAMETERS.UP WT=83K, DOWN WT=86K,ALL WT CHECKS INCLUDE TOP DRIVE WT-40K. -ACQUIRE SLOW CIRCULATING RATES. -DROP 1"STAINLESS STEEL BALL TO OPERATE RCJB. -TAG TOP OF SAND©2376'.DRY DRILL©5 RPM TO 2377'.WASH DOWN @ 7 BPM/2800 PSI TO 2386'. 08:30 - 10:30 2.00 CLEAN P DECOMP PJSM.PICK UP TO 2366',PUMP 20 BBLS HI VIS SWEEP. -CHASE SWEEP W/8.5 PPG BRINE TO CLEAN 8.5 BRINE RETURNS. -MONITOR WELL 10 MINUTES,WELL BORE STATIC,8.5 PPG BRINE IN AND OUT. Printed 10/12/2015 10:49:36AM i • North America-ALASKA-BP Page 20 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 12:00 1.50 CLEAN P DECOMP PJSM.POOH WITH BAKER RCJB BHA#24. -POOH FROM 2,366'MD TO 233'MD. -MONITOR WELL FOR(10)MINUTES.WELL STATIC,8.5 PPG BRINE IN AND OUT. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 8.5 PPG BRINE. 12:00 - 12:30 0.50 CLEAN P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 12:30 - 13:00 0.50 CLEAN P DECOMP PJSM.POOH FROM 233'MD TO SURFACE AND INSPECT BAKER RCJB BHA#24. -CLEAN OUT RCJB AND RECOVERED 5 LBS OF METAL FROM MAGNET AND RCJB. 13:00 - 14:00 1.00 CLEAN P DECOMP M/U AND RIH WITH BAKER RCJB BHA#25. -RIH FROM SURFACE TO 233'MD. 14:00 - 16:00 2.00 CLEAN P DECOMP RIH WITH BAKER RCJB BHA#25. -RIH FROM 233'MD TO 2,388'MD. 16:00 - 16:30 0.50 CLEAN P DECOMP WASH DOWN OVER SAND WITH RCJB. -ROTATE AT 10 RPM,WOB=2-3 KLBS.WITH NO PUMP FROM 2,388'MD TO 2,389'MD. -PUMP AT 7 BPM=2,600 PSI AND WASH DOWN FROM 2,389'MD TO 2,406'MD.PUW= 84 KLBS,SOW=88 KLBS,ROT.WT.=8 KLBS, FREE TORQUE=1 FT-KLBS. 16:30 - 17:00 0.50 CLEAN P DECOMP PUMP 20 BBL HI-VIS SWEEP AT 7 BPM=2,600 PSI. -CIRCULATE OUT UNTIL RETURNS ARE CLEAN 8.5 PPG BRINE. 17:00 - 18:30 1.50 CLEAN P DECOMP PJSM.POOH WITH BAKER RCJB BHA#25. -POOH FROM 2,406'MD TO 265'MD. -MONITOR WELL FOR(10)MINUTES.WELL STATIC,8.5 PPG BRINE IN AND OUT. 18:30 - 21:00 2.50 CLEAN P DECOMP POOH FROM 265'MD TO SURFACE AND INSPECT BAKER RCJB BHA#25. -RECOVERED(2)VERY SMALL PIECES OF METAL,CALL ODE DECISION MADE TO UD BHA. -L/D BHA#25. -CLEAR AND CLEAN RIG FLOOR. 21:00 - 23:00 2.00 CLEAN P DECOMP PRESSURE TEST 9-5/8"CASING. -R/U TEST EQUIPMENT ON RIG FLOOR. -PRESSURE TEST TO 250 PSI LOW,3,500 PSI HIGH FOR(30)CHARTED MINUTES.PASSES BP TEST CRITERIA. 23:00 - 23:30 0.50 DHB P DECOMP PJSM.M/U RBP RUNNING TOOL. 23:30 - 00:00 0.50 DHB P DECOMP RIH WITH RBP RUNNING TOOL. -RIH FROM SURFACE TO 1,150'MD. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 9.8 PPG BRINE. 8/30/2015 00:00 - 00:30 0.50 DHB P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 00:30 - 01:30 1.00 DHB P DECOMP PJSM.RIH WITH RBP RETRIEVING TOOL ON 4"DRILL PIPE. -RIH FROM 1,150'MD TO 2,385'MD.PUW=72 KLBS,SOW=75 KLBS. -ACQUIRE SLOW CIRCULATING RATES. Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 21 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task ' Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 02:00 0.50 DHB P DECOMP WASH DOWN AT 7 BPM=200 PSI FROM 2,385' MD TO 2,417'MD. -CIRCULATE BOTTOMS UP,SAND NOTED ACROSS SHAKERS,NO LARGE DEBRIS. 02:00 - 04:00 2.00 DHB P DECOMP ENGAGE RBP AS PER HES REPRESENTATIVE. -CIRCULATE 20 BBL HI-VIS SWEEP,SURFACE TO SURFACE AT 6 BPM=150 PSI. -RELEASE RBP. -MONITOR WELL FOR(10)MINUTES.WELL STATIC,8.5 PPG IN AND OUT. 04:00 - 06:30 2.50 DHB P DECOMP PJSM.POOH WITH HES RBP. -POOH FROM 2,385'MD TO SURFACE. -AT SURFACE,NO BRIDGE PLUG. RETRIEVING TOOL LOOKS GOOD. -INDICATIONS THAT BRIDGE PLUG WAS LATCHED UP. 06:30 - 11:00 4.50 DHB N DFAL DECOMP PJSM.RIH WITH RBP RETRIEVING TOOL ON 4"DRILL PIPE. -RIH FROM SURFACE TO 2,575'MD.PUW=75 KLBS,SOW=76 KLBS. -SET DOWN AT 2,575'MD,ATTEMPT TO SET BRIDGE PLUG,NO GOOD,BRIDGE PLUG NOT LATCHED. -RUN IN HOLE WITH SINGLES FROM PIPE SHED TO 3,933 MD'.PUW=93 KLBS,SOW= 95 KLBS. -CONTINUE IN AND TAG UP AT 3,938'MD, OBSERVE PIPE TURN 1/4 TURN TO THE RIGHT. 11:00 - 12:00 1.00 DHB N DFAL DECOMP PJSM.PUMP 20 BBLS HI VIS SWEEP. -CIRCULATE SWEEP AROUND AT 12 BPM= 900 PSI. -SET DOWN 15 KLBS ON BRIDGE PLUG,PICK UP AND RELEASE AS PER HES REPRESENTATIVE. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 8.5 PPG BRINE. 12:00 - 13:00 1.00 DHB N DFAL DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. PJSM.CONTINUE CIRCULATING AT 10 BPM= 640 PSI UNTIL RETURNS ARE CLEAN. -MONITOR WELL FOR(10)MINUTES.WELL STATIC,8.5 PPG IN AND OUT. 13:00 - 15:00 2.00 DHB N DFAL DECOMP PJSM.POOH WITH HES RBP. -POOH FROM 3,938'MD TO 111'MD. -MONITOR WELL FOR(10)MINUTES. 15:00 - 16:00 1.00 DHB N DFAL DECOMP L/D HES RBP. -POOH 111'MD TO SURFACE. Printed 10/12/2015 10:49:36AM • North America-ALASKA-BP Page 22 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 'X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs ®® NPT NPT Depth Phase Description of Operations hr (usft 16:00 - 19:00 3.00 CASING P DECOMP PJSM.PRESSURE TEST TTP/PACKER/CASING. -R/U TEST EQUIPMENT ON RIG FLOOR. -REVIEW PRESSURE CROSS CHECKLIST WITH CREW AND ANSWER ALL CHALLENGE QUESTIONS,VALVE ALIGNMENT VERIFIED. -PRESSURE TEST TO 250 PSI LOW,3,500 PSI HIGH FOR(45)CHARTED MINUTES.DOES NOT MEET BP TESTING CRITERIA -INITIAL PRESSURE 3,700 PSI -15 MINUTES:3,600 PSI -30 MINUTES:3,500 PSI -45 MINUTES:3,420 PSI. -CONTACT ODE,DECISION MADE TO PERFORM TEST ATA LATER DATE. -R/D TESTING EQUIPMENT ON RIG FLOOR. 19:00 - 20:30 1.50 FISH P -_ DECOMP PJSM.M/U BAKER ITCO SPEAR BHA#26. -RIH FROM SURFACE TO 224'MD. 20:30 - 22:30 2.00 FISH P -_ DECOMP RIH WITH BAKER SPEAR BHA#26. -RIH FROM 224'MD TO 3,823'MD. 22:30 - 00:00 1.50 FISH P DECOMP SLIP AND CUT 68'OF DRILLING LINE. -INSPECT BRAKES AND SAVER SUB. 8/31/2015 00:00 - 00:30 0.50 FISH P ■ DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 00:30 - 02:00 1.50 FISH P DECOMP PJSM.RIH WITH BAKER SPEAR BHA#26 AND ENGAGE 7"26#N-80 TUBING. -RIH FROM 3,823'MD TO 3,920'MD.PUW= 105 KLBS,SOW=101 KLBS. -ACQUIRE SLOW CIRCULATING RATES. PERFORM PRE JARRING DERRICK INSPECTION -RIH FROM 3,920'MD TO 3,955'MD AND NO-GO.SET DOWN 10 KLBS.PULL 50 KLBS OVER STRING WEIGHT(155 KLBS WEIGHT INDICATOR). -HIT JARS AT 235 KLBS(4X)TO GET GOOD GRAPPLE ENGAGEMENT.(235 KLBS WEIGHT INDICATOR) -HIT JARS AT 250-280 KLBS TO GET GOOD GRAPPLE ENGAGEMENT. 02:00 - 03:00 1.00 FISH P DECOMP ATTEMPT TO ROTATE OUT THE CRISS-CROSS SAFETY JOINT. -P/U TO STRING WEIGHT PLUS 7"TUBING WEIGHT AT 230 KLBS. -SET TORQUE LIMIT AT 10 FT-KLBS,STALL OUT AT 5.5 TURNS. -WORK PIPE TO WORK TORQUE DOWN. -SET TORQUE LIMIT AT 10 FT-KLBS,STALL OUT AT 6.5 TURNS TOTAL. -WORK PIPE TO WORK TORQUE DOWN. -SET TORQUE LIMIT AT 12 FT-KLBS,STALL OUT AT 7.5 TURNS TOTAL. -WORK PIPE TO WORK TORQUE DOWN, UNABLE TO GET MORE THAN 7.5 TURNS WITH 12 FT-KLBS TORQUE LIMIT. -UNWRAP 7.5 TURNS BACK TO THE LEFT TO KEEP GRAPPLE FROM RELEASING. Printed 10/12/2015 10:49:36AM i • North America-ALASKA-BP Page 23 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UW:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 06:30 3.50 FISH P DECOMP JAR AND STRAIGHT PULL 7"26#N-80 TUBING. -JARRING AT 230-300K LBS,WITH STRAIGHT PULL TO 280-360K LBS. -PERFORMING A FULL DERRICK INSPECTION EVERY(15)JAR LICKS. -NO ANOMOLIES FOUND DURING ANY DERRICK INSPECTION. -NO PIPE MOVEMENT NOTED DURING JARRING OPERATIONS. 06:30 - 08:00 1.50 FISH P DECOMP PJSM.ATTEMPT TO RELEASE 7"BROWN SAFETY JT. -PICK UP TO 230K,(STRING WT+WT OF 7" TO SAFETY JT CONNECTION). -ROTATE TO THE RIGHT UNTIL 14K FT/LBS IS ACHIEVED,(10 TURNS). -WORK TORQUE DOWN BY PICKING UP TO 250KAND SLACKING OFF TO 200K MULTIPLE TIMES. -ATTEMPT SEVERAL TIMES TO APPLY MORE TORQUE,NO INDICATION OF CONNECTION BREAKING. -CONSULT TOWN ODE AND RELEASE GRAPPLE. 08:00 - 09:00 1.00 FISH P DECOMP PJSM.CIRCULATE BOTTOMS UP. -PUPM AT 5 BPM=190 PSI. -MONITOR WELL FOR(10)MINUTES.WELL STATIC,8.5 PPG BRINE IN AND OUT. 09:00 - 12:00 3.00 FISH P DECOMP PJSM.BLOW DOWN TOP DRIVE. -POOH FROM 3,982'MD TO 319'MD. -MONITOR WELL FOR(10)MINUTES.WELL STATIC,8.5 PPG BRINE IN AND OUT. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 8.5 PPG BRINE. 12:00 - 12:30 0.50 FISH P DECOMP SERVICE RIG AND INSPECT RIG EQUIPMENT. -PERFORM SPCC,CROWN 0 MATIC CHECK, OK. 12:30 - 13:30 1.00 FISH P DECOMP PJSM.UD BAKER SPEAR BHA#26. -POOH FROM 319'MD TO SURFACE. 13:30 - 15:30 2.00 FISH P DECOMP PJSM.M/U ARROW-PAK PATCH RETRIEVING TOOL BHA#27. -RIH FROM SURFACE TO 317'MD. 15:30 - 18:00 2.50 FISH P DECOMP RIH WITH ARROW-PAK PATCH RETRIEVING TOOL BHA#27 RIH FROM 317'MD TO 3,950'MD.PUW=105 KLBS,SOW=100 KLBS. Printed 10/12/2015 10.49.36AM 111 • North America-ALASKA-BP Page 24 of 50 Operation Summary Report Common Well Name:J-03 ,AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 19:00 1.00 FISH P DECOMP ENGAGE ARROW-PAK PACKER. -PUMP AT 3 BPM=80 PSI,CONTINUE TO RIH UNTIL PRESSURE INCREASE SEEN.SHUT OFF PUMPS. -ACQUIRE SLOW CIRCULATING RATES. -ENGAGE PATCH AT 4,021'MD,SET DOWN 10 KLBS TO VERIFY. -STRAIGHT PULL TO 30 KLBS,FIRST SHEAR PINS SHEAR AT 15 KLBS. -CONTINUE STRAIGHT PULL TO 60 KLBS, JARS HIT. -RE-SET JARS BY SLACKING OFF TO 95 KLBS. -STRAIGHT PULL TO 30 KLBS AND GAVE FREE.PUW=106 KLBS,SOW=100 KLBS. -RUN BACK IN HOLE TO 4,021'MD AND NO GO,SET DOWN 10 KLBS. -PICK UP WITH NO OVERPULL.PUW=106 KLBS,SOW=100 KLBS. -MONITOR WELL FOR(10)MINUTES.WELL STATIC,8.5 PPG IN AND OUT. 19:00 - 22:00 3.00 FISH P DECOMP POOH WITH ARROW-PAK PACKER ON BHA #27. -POOH FROM 4,021'MD TO 317'MD. -MONITOR WELL FOR(10)MINUTES.WELL STATIC,8.5 PPG IN AND OUT. 22:00 - 22:30 0.50 FISH P DECOMP PJSM. -POOH FROM 317'MD TO SURFACE. -NO PACKER ON RETRIEVAL TOOL. -LOWER SET SCREWS SHEARED,UPPER SET SCREWS NOT SHEARED.INDICATION ON PACKER RETRIEVAL THREADS OF ENGAGEMENT ON FIRST 3 THREADS. -CALL ODE AND DAY WSL WITH RESULTS, DECISION MADE TO RUN BACK IN HOLE WITH RETRIEVAL TOOL.DRESS TOOL WITH 10,600 KLBS UPPER SHEAR PINS,43,500 KLBS LOWER SHEAR PINS. 22:30 - 00:00 1.50 FISH N DFAL DECOMP PJSM.M/U ARROW-PAK PATCH RETRIEVING TOOL BHA#28. -RIH FROM SURFACE TO 105'MD. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 8.5 PPG BRINE. 9/1/2015 00:00 - 00:30 0.50 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 00:30 - 01:30 1.00 FISH N DFAL DECOMP PJSM.M/U ARROW-PAK PATCH RETRIEVING TOOL BHA#28. -RIH FROM 105'MD TO 317'MD. -MONITOR WELL,10 MINUTES,WELL BORE STATIC,8.5 PPG BRINE IN AND OUT. Printed 10/12/2015 10:49:36AM i • North America-ALASKA-BP Page 25 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 04:00 2.50 FISH N DFAL DECOMP PJSM.107K UP WT,103K DOWN.BRING ON PUMP @ 6 BPM/300 PSI. -WASH DOWN F./3950'-4019'&OBSERVE PRESSURE GRADUALLY INCREASE TO 550 PSI. -KICK OUT PUMP AND LOCATE OUT ON TOP PACKER W/20K SET DOWN,SEE SHEAR. -P/U TO 110K,OBSERVE FIRST SHEAR AND PICK ON UP TO 160K,JARS WENT OFF. -PULL TO 150K,PULLING FREE W/SOME OVER PULL,5-15K. -RBIH,OBSERVE SEALS RE ENTERING LOWER PACKER,SET DOWN 25K AND PICK UP TO 3950'. 04:00 - 07:30 3.50 FISH N DFAL DECOMP PJSM.MONITOR WELL,WELL BORE STATIC, 10 MINUTES.8.5 PPG BRINE IN AND OUT. -POOH W/ARROW-PAK PATCH RETRIEVING ASSEMBLY ON 4"DRILL PIPE. -MONITOR WELL 10 MIN AT BHA,WELLBORE STATIC,8.5 PPG IN/OUT. -CONTINUE TO POOH,RACK BACK(2) STANDS DRILL COLLARS. -POOH,NO FISH.DISCUSS OPTIONS WITH TOWN AT MORNING CALL. 07:30 - 11:00 3.50 FISH P DECOMP PJSM.CLEAR/CLEAN RIG FLOOR. -SUCK OUT BOP STACK.CLEAN TOP OF WEAR BUSHING. -PULL WEAR BUSHING. -MAKE UP NOZZLE ASSEMBLY FOR CLEANING RAM CAVITIES. -WASH OUT STACK,BLOW DOWN TOP DRIVE. -CLEAN WELLHEAD PROFILE. 11:00 - 12:00 1.00 BOPSUR P DECOMP PJSM.INSTALL TEST PLUG,RUN IN LOCK DOWN SCREWS. -RIG UP EQUIPMENT FOR BOPE TEST. 12:00 - 18:00 6.00 BOPSUR P DECOMP PJSM.PERFORM BODY TEST ON BOPE @ 250 /3500 PSI/5 MIN EACH,OK. -TEST BOPE AS PER BP AND AOGCC REQUIREMENTS. -TESTS DONE @ 250/3500 PSI/5 MIN EACH /CHARTED. -AOGCC REP BOB NOBLE WAIVED WITNESSING THE TEST. OBBLS LOSSES @ NOON 8.5PPG MW IN AND OUT 18:00 - 19:00 1.00 BOPSUR P DECOMP R/D TEST EQUIPMENT,SUCK OUT STACK, BLOW DOWN LINES,CLEAR RIG FLOOR 19:00 - 21:00 2.00 FISH P DECOMP P/U AND RE-DRESS BAKER FISHING BHA#29 SPEAR ASSEMBLY -RIH T/208'MD 21:00 - 23:30 2.50 FISH P DECOMP CONTINUE T/RIH W/BAKER FISHING BHA# 29 F/208'MD T/3944'MD -CHECK TORQUE ON ALL D/C AND D/P CONNECTIONS WHILE RUNNING IN HOLE -DP MADE UP T/18.5K FT-LBS(WEAKEST CONNECTION TORQUE) -PUW=104KLBS,SOW=101KLBS Printed 10/12/2015 10:49:36AM North America-ALASKA-BP Page 26 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud DateMme:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 FISH P DECOMP P/U TWO SINGLES F/PIPE SHED AND 10'PUP F/SPACE OUT F/E-LINE RIG UP OBBLS LOSSES @ MIDNIGHT 8.5PPG MW IN AND OUT 9/2/2015 00:00 - 00:30 0.50 FISH P DECOMP ENGAGE SPEAR ON 7"CSG,NO-GO @ 3951'MD PUW=104KLBS,SOW=101KLBS SPR'S MP#1=30SPM=60PSI,40SPM=90PSI MP#2=30SPM=80PSI,40SPM=140PSI 00:30 - 02:00 1.50 FISH P DECOMP E-LINE UNIT EXPERIENCED MOTOR FAILURE, DISCUSS PLAN FORWARD WITH ODE AND SUPERINTENDENT. -PLAN TO MOVE FORWARD WITH R -OVEROPERATIONS PULL 225KINPLBSEP ONFOR STRINGE-LINE AND PLACE 2 LH TURNS INTO DRILL STRING, WORK DOWN TORQUE WITH 325KLBS UP WEIGHT AND 140KLBS DOWN WEIGHT,10-15 TIMES.(4K FT-LBS AFTER 2 WRAPS) -REPEAT OVERPULL AND PLACE 2 MORE LH TURNS INTO DRILL STRING,(5K FT-LBS AFTER 4 WRAPS),WORK DOWN TORQUE WITH 325KLBS UP WEIGHT AND 140KLBS DOWN WEIGHT,10-15 TIMES. -REPEAT OVERPULL AND PLACE 2 MORE LH TURNS INTO DRILL STRING,(6K FT-LBS AFTER 6 WRAPS),TORQUE DROPPED OFF 1K FT-LBS AFTER 6K FT-LBS OF TORQUE APPLIED BUT THEN CONTINUED TO RISE (TORQUE APPEARED TO BREAK A CONNECTION IN STRING)WORK DOWN TORQUE WITH 325KLBS UP WEIGHT AND 140KLBS DOWN WEIGHT,10-15 TIMES. -REPEAT OVERPULL AND PLACE 2 MORE LH TURNS INTO DRILLS STRING(7K FT-LBS AFTER 8 WRAPS),PIPE APPEARED TO BE BACKING OFF,WORK TORQUE WITH 275KLBS UP AND 140KLBS DOWN WEIGHT 10 -15 TIMES -REPEAT STEPS UNTIL 12 TURNS IN STRING BUT LOWERING OVERPULL T/210KLBS DUE TO POTENTIAL FOR RELEASING STRING UNEXPECTEDLY,TORQUE NEVER EXCEEDED 8.5KLBS IN THE PROCESS,AND STRING RELEASED AT JUST OVER 12 WRAPS. LEAVING 50KLBS ON THE WEIGHT INDICATOR (10K OVER BLOCK WEIGHT=-850'OF DP) 02:00 - 02:30 0.50 FISH P DECOMP PERFORM DERRICK INSPECTION 02:30 - 03:00 0.50 FISH N DFAL DECOMP M/U TO STRING,VERIFY GRAPPLE RELEASED -PUW=104KLBS(SAME AS PRIOR T/ BACKING OFF) Printed 10/12/2015 10:49:36AM S • North America-ALASKA-BP Page 27 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor.DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 10:30 7.50 FISH N DFAL DECOMP POOH W/BAKER FISHING BHA#29 F/3945'MD T!271'MD -MONITOR WELL F/10MINS PRIOR TO POOH (STATIC)8.5PPG MW IN AND OUT -CHECK EACH CONNECTION TORQUE ON THE WAY OUT OF HOLE -BROKEN CONNECTION FOUND ON THE BOTTOM OF STAND 31 AND TOP OF STAND 30,C/O THE 2 DAMAGED JOINTS '10:30 - 12:00 1.50 FISH N DFAL DECOMP LAY DOWN BAKER FISHING BHA#29 -MONITOR WELL F/10 MINS PRIOR T/ PULLING BHA THROUGH BOPE,(STATIC) 8.5PPG IN AND OUT -R/B DC'S IN THE DERRICK,L/D SPEAR BHA LOSSES @ NOON=0 BBLS 8.5PPG MW IN AND OUT 12:00 - 12:30 0.50 FISH P DECOMP SERVICE RIG AND INSPECT EQUIPMENT 12:30 - 13:00 0.50 FISH N DFAL DECOMP P/U AND M/U BAKER FISHING SPEAR ASSEMBLY BHA#30 AND TIH T/207'MD -MONITOR WELL(STATIC),8.5PPG MW IN AND OUT 13:00 - 15:30 2.50 FISH N DFAL DECOMP CONTINUE T!RIH F/207'MD T/TOP OF STUMP @ 3946'MD -POW=104KLBS,SOW=101 KLBS 15:30 - 16:00 0.50 FISH P DECOMP PUMP 2 BPM @ 40PSI AND ENGAGE STUMP @ 3946'MD,SET DOWN 5KLBS NO-GO TO 3954'MD 16:00 - 19:00 3.00 FISH P DECOMP JAR AND WORK PIPE -PRE JARRING DERRICK INSPECTION AND GOOD PRE JOB,EXCLUSION ZONES -UTILIZE 50KLBS TO 170KLBS OVER STRING WEIGHT JAR LICKS AND STRAIGHT PULLS UP TO 400KLBS -PERFORM DERRICK INSPECTION -E-LINE BACK INTO PLACE IN PREP FOR RUNNING CHARGE CORD 19:00 - 20:00 1.00 FISH P DECOMP RELEASE SPEAR,P/U AND INSTALL SPACE OUT PUPS F/ELINE RIG UP,ENGAGE STUMP AND APPLY TORQUE -WORK 4 LH TURNS DOWN THE DRILL STRING SETTING 5K FT-LBS TORQUE IN THE SLIPS,LOCKING THE ROTARY. 20:00 - 22:30 2.50 FISH P DECOMP R/U SLB E-LINE PRESSURE CONTROL EQUIPMENT F/STRING SHOT RUN -PJSM WI WSL,PUSHER,CREW,SLB,AND BOT REP -PERFORM VISUAL LEAK TIGHT TEST T/ 3500PSI ON SYSTEM(NO LEAKS) 22:30 - 00:00 1.50 FISH P DECOMP CIO TOOLS,M/U STRING SHOT ASSEMBLY#1 LOSSES @ MIDNIGHT=0 BBLS 8.5PPG MW IN AND OUT 9/3/2015 00:00 - 01:30 1.50 FISH N WSEQ DECOMP TROUBLE SHOOT ELINE FIRING HEAD NOT ABLE TO PASS THROUGH TIW -RE-DRESS FIRING HEAD AND ATTEMPT T/ RUN BACK IN HOLE(NO SUCCESS) -MIC FIRING HEAD OD(1.751")(FIRING HEAD SHOWS SIGNS OF SWELLING) -MIC BACK UP FIRING HEAD,(SAME SWELLING CHARACTERISTIC) Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 28 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 03:00 1.50 FISH N WSEQ DECOMP ADD WEIGHT BAR T/E-LINE BHAAS WELL AS RE-DRESS FIRING HEAD AND RIH(NO SUCCESS) -ELINE BHA SHOWS CONSISTENT MARKINGS AROUND THE ELINE FIRING HEAD -REMOVE TIW,CALIPER(-1.74),AND ATTEMPT SECOND TIW DRIFT,(NO SUCCESS) 03:00 - 05:30 2.50 FISH N WSEQ DECOMP DISCUSS OPTIONS W/ODE, SUPERINTENDENT,BAKER FISHING,SLB E-LINE AND DECIDE T/SWAP OUT TO A 4.5"IF FLOOR VALVE(2.75"ID)AND AN ITCO SPEAR (2.00"ID).RIG DOWN SCHLUMBER E LINE 8 LUBRICATOR. 05:30 - 07:00 1.50 FISH N WSEQ DECOMP MONITOR WELL,WELL STATIC,10 MINUTES, 8.5 PPG BRINE IN AND OUT. -RELEASE TORQUE FROM PIPE,RELEASE GRAPPLE. -POOH W/BAKER FISHING BHA#30. -POOH TO BHA @ 270'. 07:00 - 08:30 1.50 FISH N WSEQ DECOMP PJSM.MONITOR WELL 10 MINUTES,WELL BORE STATIC,8.5 PPG IN AND OUT. -PICK UP AND MAKE UP ITCO SPEAR AND BHA. -MONITOR WELL 10 MIN./WELL BORE STATIC,8.5 PPG IN AND OUT,NO FLUID LOSS. 08:30 - 10:00 1.50 FISH N WSEQ DECOMP PJSM.RIH W/SPEAR ASSEMBLY ON 4"DRILL PIPE. -RIH F/208'-3955'.UP WT=104K,DOWN WT =101K,ALL WT CHECKS INCLUDE TOP DRIVE Wr/40K. 10:00 - 12:00 2.00 FISH N WSEQ DECOMP PJSM.ENGAGE 7"CASING STUB @ 3949'. OVER PULL AND LET JARS GO OFF©150K, (45K OVER). -CONDUCT PRE JARRING DERRICK INSPECTION,CORDON OFF FLOOR AREA. -JAR(2X)@ 250K AND PULL TO 350K,NO INDICATION OF PIPE MOVEMENT. -LAY DOWN SINGLE AND BLOW DOWN TOP DRIVE. LOSSES @ NOON=OBBLS MW=8.5PPG IN AND OUT 12:00 - 13:00 1.00 FISH P DECOMP SERVICE AND INSPECT T/D AND DERRICK 13:00 - 15:00 2.00 FISH P DECOMP R/U WIRE LINE W/PRESSURE CONTROL EQUIPMENT F/STRING SHOT -PRESSURE TEST VISUAL F/5MINS @ 3500PSI,NO LEAKS 15:00 - 18:00 3.00 FISH P DECOMP M/U STRING SHOT FIRING HEAD,RIH AND FIRE -LOCATE DESIRED COLLAR @ 4499'MD, PLACE MIDDLE OF STRING SHOTACROSS COLLAR 18:00 - 20:30 2.50 FISH P DECOMP POOH W/ELINE BHA,NOTABLE TO PASS THROUGH ITCO SPEAR WITH ELINE FIRING HEAD @ 3954'MD -WORK ELINE BHA IN ATTEMPT TO GET THROUGH SPEAR(NO SUCCESS) -DECISION T/PART ELINE AT WEAK POINT -OVER PULL ELINE T/2550FT-LBS AND PART ELINE AT WEAK POINT Printed 10/12/2015 10:49:36AM • North America-ALASKA-BP Page 29 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E (5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code ' NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 22:00 1.50 FISH P DECOMP R/D ELINE AND CLEAR RIG FLOOR 22:00 - 22:30 0.50 FISH P DECOMP ATTEMPT T/BACK OFF PIPE AT STRING SHOT LOCATION -P/U SINGLE JOINT,M/U T/D AND RELEASE BRAKE,(NO TORQUE IN STRING) -ROTATE 3 TURNS T/LEFT,2K FT-LBS OF TORQUE SEEN,BUT NOT CLIMBING -PULL UP ON STRING AND SEE WEIGHT INDICATOR BREAK OVER AT 118KLBS (14KLBS OVER STRING WEIGHT) 22:30 - 23:00 0.50 FISH P DECOMP R/U 7"POWER TONGS AND CSG EQUIPMENT 23:00 - 00:00 1.00 FISH P DECOMP CONTINUE T/POOH W/BAKER FISHING BHA STANDING BACK 4"DP STANDS IN DERRICK F/3954'MD T/2860'MD LOSSES @ MIDNIGHT=OBBLS MW=8.5PPG IN AND OUT 9/4/2015 00:00 - 00:30 0.50 FISH P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT 00:30 - 02:30 2.00 FISH P DECOMP CONTINUE T/POOH W/BAKER FISHING BHA #31 F/2860'MD-271'MD -MONITOR WELL 10 MINS PRIOR T/PULLING BHA(STATIC),8.5PPG IN AND OUT 02:30 - 03:00 0.50 FISH P DECOMP L/D BAKER FISHING BHA#31 -STAND BACK DC'S,UD BUMPER/OIL JARS 03:00 - 04:00 1.00 FISH P DECOMP PJSM.L/D 7"CSG W/SPEAR,L/D FULL JNT WI ARROW PAC PACKER ASSEMBLY -PACKER ASSEMBLY RELEASED FROM LOWER PACKER,UPPER PACKER STUCK IN FULL JOINT -FLOOR HANDS CUT 2-7/8"PIPE AND GLM EXTRUDING FROM FULL CSG JOINT WITH MANUAL PIPE CUTTERS 04:00 - 05:00 1.00 FISH P DECOMP PJSM.L/D 7"IJ-4S CSG -13 FULL JNTS AND 1 CUT JNT(35.78') 05:00 - 07:00 2.00 FISH P DECOMP P/U SPEAR AND CUT JNT FROM SHED, RELEASE SPEAR AND UD SPEAR AND CUT JNT. -CLEAR FLOOR OF CASING EQUIPMENT. 07:00 - 11:00 4.00 FISH N HMAN DECOMP PJSM.RIG UP E LINE,MAKE UP TOOLS. -RIH W/3.64"DRIFT AND 4 1/4"CENTRALIZER THAT COLLAPSES TO 4"OD. -RIH TO 9385'E LINE MEASUREMENT AND SET DOWN HARD SEVERAL TIMES. -THIS DEPTH CORRELATES TO WHERE THE SEAL BORE IS WHICH IS 4"ID. -OPT TO POOH,DISCUSS WITH ENGINEER AND SUPERINTENDENT. -DECISION MADE TO RUN SCHLUMBERGER JET CUTTER AND CUT 7"ABOVE PBR. 11:00 - 12:00 1.00 FISH P DECOMP M/U SLB E-LINE POWER CUTTER CUTTING TOOL LOSSES©NOON=OBBLS 8.5PPG MW IN AND OUT Printed 10/12/2015 10:49:36AM S North America-ALASKA-BP Page 30 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task , Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 18:30 6.50 FISH P DECOMP CONTINUE M/U SLB E-LINE CUTTER RIH, PLACE CUTTER ON DEPTH AND CUT 7"TBG -RIH T/9330'MD 10'BELOW LAST COLLAR ON CCL PRIOR T/TAG UP DEPTH -GUN FIRED W/GOOD INDICATIONS SEEN ON WEIGHT INDICATOR,AND FELTAT RIG FLOOR -POOH AND VERIFY POWER CUTTER FIRED (GOOD) 18:30 - 19:30 1.00 FISH P DECOMP R/D SLB ELINE AND CLEAR RIG FLOOR 19:30 - 21:30 2.00 FISH P DECOMP P/U AND M/U BAKER FISHING 7"ITCO SPEAR BHA#32 AS PER BAKER REP 21:30 - 00:00 2.50 FISH P DECOMP RIH ON DP OUT OF DERRICK W/BAKER FISHING ITCO SPEAR BHA#32 T/4301'MD -PUW=110KLBS,SOW=105KLBS LOSSES(d1 MIDNIGHT=OBBLS 8.5PPG MW IN AND OUT 9/5/2015 00:00 - 00:30 0.50 FISH P DECOMP INSPECT TOOLS,PJSM F/SLIP AND CUT DRILLING LINE 00:30 - 03:00 2.50 FISH P DECOMP SLIP AND CUT 68'OF DRILLING LINE -INSPECT SAVER SUB(THREADS GOOD) PERFORM DRAWWORKSAND DERRICK INSPECTION F/PRE-JARRING 03:00 - 03:30 0.50 FISH P DECOMP CONTINUE IN THE HOLE P/U DP F/PIPE SHED F/4301'MD-4491'MF -PUW=113KLBS,SOW=107KLBS -SPR'S:MPI:30 SPM=10PSI,40 SPM= 50PSI,MP2:30 SPM=40PSI,40 SPM=100PSI 03:30 - 05:00 1.50 FISH P DECOMP ENGAGE FISH()4509'MD,NO-GO ON STOP SUB©4519'MD,P/U 170K T/BLEED JARS OPEN,P/U 275KLBS NO MOVEMENT,P/U AND JAR 225KLBS W/300KLBS STRAIGHT PULL, JAR W/250KLBS AND 320KLBS STRAIGHT PULL,FISH STARTED DRAGGING UP HOLE -WORK PIPE FREE W/315KLBS-290KLBS, LOSE RETURNS -ATTEMPT T/CIRCULATE DOWN DP, PRESSURE RISES T/1000PSI -CLOSE ANNULAR AND PUMP DOWN KILL LINE INTO ANNULUS 4BPM=1500PSI -BULLHEAD AWAY 75BBLS DOWN ANNULUS, OPEN HCR AND MONITOR FOR PRESSURE NO PRESSURE) -ESTABLISH LOSS RATE OF 42 BPH. 05:00 - 07:00 2.00 FISH P DECOMP PJSM.WORK PIPE UP AND DOWN.300K UP WT,140K DOWN. -PUMP DOWN DRILL PIPE @ 3BPM/PICK UP WT FALLS TO 225K W/1200 PSI. -SHUT DOWN PUMP AND WORK DOWN, ABLE TO CIRCULATE THRU DRILL PIPE. -MIX AND PUMP 40 BBLS HI VIS PILL DOWN DRILL PIPE AND DOWN 7"CASING. -STAGE PILL JUST OUTSIDE CASING AND BULL HEAD 35 BBLS TO SPOT BELOW ALL PIPE. Printed 10/12/2015 10:49:36AM i • North America-ALASKA-BP Page 31 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB(g57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 08:00 1.00 FISH P DECOMP PJSM.CONTINUE TO CIRCULATE,OBSERVE GAS PERCOLATING IN BELL NIPPLE. -SHUT DOWN PUMP,CLOSE ANNULAR AND ROUTE RETURNS THRU CHOKE AND MUD GAS SEPARATOR. -5 BPM/350 PSI.FINISH PUMPING A FULL BOTTOMS UP,8.5 PPG BRINE RETURNS. 08:00 - 10:00 2.00 FISH P DECOMP MONITOR WELL,ESTABLISH LOSS RATE,14 BPH. -DROP 2 1/8"BALL ROD TO OPEN PUMP OUT SUB. -OPEN BAKER PUMP OUT SUB W/1300 PSI. -ACQUIRE SLOW PUMP RATES MP1=30 SPM /20 PSI&40 SPM/50 PSI. -MP2=30 SPM/50 PSI&40 SPM/95 PSI. CIRC BTMS UP FROM PUMP OUT SUB t 4491' -MONITOR WELL,10 MIN,WELL BORE STATIC,8.5 PPG IN AND OUT. 10:00 - 12:00 2.00 FISH P DECOMP PJSM.POOH F/4491'OF DP AND 137K OF 7" FISH.UP WT=250K,DOWN WT=165K. -POOH TO 2122'AND FISH.UP WT=198K AND DOWN 157K. -LOSSES TO WELL BORE LAST(12)HOURS= 275 BBLS OF 8.5 PPG BRINE. 12:00 - 12:30 0.50 FISH P DECOMP SERVICE RIG FLOOR AND PIPE SKATE EQUIPMENT 12:30 - 14:00 1.50 FISH P DECOMP CONTINUE T/POOH W/7"CSG FISH F/ 2122'MD T/6.25"DC'S -MONITOR WELL F/10MINS,VERIFY 7.5BPH LOSS RATE W/8.5PPG MW 14:00 - 15:00 1.00 FISH P DECOMP STAND BACK DC'S BREAK AND L/D BAKER FISHING BHA 15:00 - 15:30 0.50 FISH P DECOMP CROSS OVER T/UD 7"LINER,M/U FLOOR VALVE 15:30 - 16:00 0.50 FISH P DECOMP CIRCULATE SURFACE T/SURFACE VOLUME 7BPM 160PSI -MONITOR WELL 10MINS,LOSS RATE 7.5BPM LOSS RATE W/8.5PPG MW SPR'S:MP#1©30SPM=30PSI,c 40SPM= 40PSI,MP#2 @ 30SPM=40PSI, ©40SPM= 50PSI 16:00 - 23:00 7.00 FISH P DECOMP POOH L/D 26#7"IJ4S LINER F/4822'MD -PUW=147KLBS,SOW=145KLBS -122 FULL JOINTS AND 1 CUT JOINT=5.7'W/ 8.25"FLARE 23:00 - 00:00 1.00 FISH P DECOMP CLEAN AND CLEAR RIG FLOOR CSG TOOLS, MONITOR WELL,7 BPH STATIC LOSS RATE _ 9/6/2015 00:00 - 00:30 , 0.50 FISH P DECOMP SERVICE RIG FLOOR AND PIPE SKATE EQUIPMENT 00:30 - 02:00 1.50 FISH P DECOMP M/U BAKER FISHING ITCO SPEAR BHA#33 AND RIH T/285'MD -REMOVE PACK-OFF FROM BHA -MONITOR WELL F/10MINS,8.5PPG MW IN AND OUT,7BHP LOSS RATE, 02:00 - 04.30 2.50 FISH P DECOMP CONTINUE T/RIH F/285'MD T/4013'MD ON DP STANDS F/DERRICK Printed 10/12/2015 10:49:36AM 110 North America-ALASKA-BP Page 32 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 12:00 7.50 FISH P DECOMP PJSM.SINGLE IN HOLE W/DP F/PIPE SHED 1X1. -RIH F/4013'-7961'.UP WT 175K,DOWN WT =135K. -NO PUMPING OPERATIONS FOR THIS TOUR. -LOSSES TO WELL BORE LAST(12)HOURS= 87 BBLS OF 8.5 PPG BRINE. 12:00 - 12:30 0.50 FISH P DECOMP SERVICE AND INSPECT RIG EQUIPMENT. -PERFORM SPCC CHECKS,CROWN 0 MATIC, OK. -INSPECT FLOOR EQUIPMENTAND PIPE SKATE,OK. 12:30 - 14:00 1.50 FISH P DECOMP PJSM.CONTINUE TO RIH W/7"SPEAR FISHING ASSEMBLY. -RIH ON 4"DP TO 9098'.UP WT 205K,DOWN WT=140K. -ACQUIRE SLOW PUMP RATES.MP 1=30 SPM/80 PSI&40 DPM/140 PSI. -MP2=30 SPM 1120 PSI&40 SPM/180 PSI. 9098',8.5 PPG BRINE. 14:00 - 17:00 3.00 FISH P DECOMP WASH DOWN T/TOP OF FISH @ 6BPM= 420PSI AND ENGAGE FISH @ 9927'MD 17:00 - 23:30 6.50 FISH P DECOMP JAR ON 7"FISH W/300K,325K,350K,JAR LOAD AND 375KLBS STRAIGHT OVERPULL -CONDUCT PRE-JARRING TOP DRIVE AND DERRICK INSPECTION -RE-INSPECT EVERY 10 JAR LICKS -PUMP 6BPM @ 550PSI DOWN THE DRILL STRING -CLOSE BAG AND ATTEMPT T/BULLHEAD DOWN ANNULUS @ 2BPM=PRESSURE QUICKLY CLIMBED T/1000PSI,COME OFF PUMPS AND SLOWLY BLEED OFF PRESSURE -DISCUSS OPTIONS W/ODE, SUPERINTENDENT,DECIDE T/ATTEMPT BLIND BACK OFF IN 5.5"PUP 23:30 - 00:00 0.50 FISH P DECOMP BEGIN APPLYING TORQUE T/ATTEMPT T/ BACK OFF 5.5"PUP JOINT F/FISH,AS PER BOT REP SPR'S:MP#1 @ 30SPM=80PSI,@ 40SPM= 140PSI,MP#2 @ 30SPM=120PSI,40SPM= 180PSI LOSSES TO WELL BORE LAST(12)HOURS= 98BBLS Printed 10/12/2015 10:49:36AM North America-ALASKA-BP Page 33 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. U'M:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/7/2015 00:00 - 00:30 0.50 FISH P DECOMP CONTINUE WORKING TORQUE INTO THE STRING IN AN ATTEMPT T/BACK OFF 5.5" PUP JOINT F/FISH -PULL 180KLBS INTO WORK STRING AND PUT 1 LH ROTATION INTO THE PIPE,TQ=2K FT-LBS -WORK TORQUE DOWN THE STRING AS PER BAKER REP -CONTINUE T/WORK SINGLE LH ROTATIONS INTO THE STRING W/180KLBS OVERPULL WORKING TQ DOWN AFTER EACH ROTATION. -AFTER 7 LH ROTATIONS AND 7K FT-LBS, SIGHT TORQUE RELEASE SEEN -CONTINUE WORKING TQ DOWN STRING -AFTER 13 LH ROTATIONS AND 7K FT-LBS STILL IN STRING,CONNECTION BACKED OFF LEAVING 70KLBS ON HOOKLOAD=(2200FT OF 4"DP) 00:30 - 01:00 0.50 FISH P DECOMP PERFORM DERRICK INSPECTION 01:00 - 09:00 8.00 FISH P DECOMP PJSM.M/U BACK T/DRILL STRING,RELEASE GRAPPLE -MONITOR WELL,10 MINUTES,4 BPH STATIC LOSS RATE,8.5 PPG IN AND OUT. -POOH W/BAKER FISHING BHA#33 F/9927'. -VISUAL CHECK ON CONNECTIONS.CHECK ALL CONNECTIONS IN VICINITY OF LOOSE ONE FOUND.2052'. 09:00 - 10:30 1.50 FISH P DECOMP MONITOR WELL 10 MIN,STATIC LOSS RATE= 4 BPH.8.5 PPG IN AND OUT. -L/D INTENSIFIER,RACK BACK DRILL COLLARS,L/D SPEAR BHA. -CLEAR/CLEAN RIG FLOOR. 10:30 - 12:00 1.50 FISH P DECOMP PJSM.MOBILIZE BHA#34,MULTI STRING CUTTER ASSEMBLY FOR CUTTING 5 1/2" TUBING. -PICK UP(2)JTS 2 7/8"HT PAC DRILL PIPE W/ MULTI STRING CUTTER BHA. LOSSES TO WELL BORE AT NOON=100 BBLS _ 12:00 - 12:30 0.50 FISH P DECOMP SERVICE RIG,INSPECT PIPE SKATE AND FLOOR EQUIPMENT. -PERFORM SPCC CHECKS,CROWN 0 MATIC, OK. 12:30 - 13:00 0.50 FISH P DECOMP R/U 2-7/8"HANDLING EQUIPMENT -MONITOR WELL AND VERIFY 4BPH LOSS RATE,8.5PPG IN AND OUT 13:00 - 14:30 1.50 FISH P DECOMP PJSM.P/U AND M/U BAKER MULTI-STRING CUTTER BHAAS PER BAKER REP 14:30 - 21:00 6.50 FISH P DECOMP RIH W/BAKER MULTI-STRING CUTTER ON 4" DP F/DERRICK T/9927'MD -LOCATE THE TOP OF 7"BY SETTING DOWN 2-3KLBS 9927'MD -PUW=200KLBS,SOW=140KLBS,ROT WT= 165KLBS @ 40RPM -WELL CONTROL DRILL WHILE RIH AND AAR. GOOD RESPONSE TIME AND NOTIFICATIONS MADE. Printed 10/12/2015 10:49:36AM North America-ALASKA-BP Page 34 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:00 - 22:30 1.50 FISH P DECOMP CONTINUE T/RIH T/9953'MD AND TAG UP ON DEBRIS,POOH T/VERIFY TOP OF 7" 9927'MD(CONFIRMED) -RIH AND ATTEMPT T/WORK PAST TAG UP POINT,NOTICE 1-2KLBS WEIGHT LOSS F/5' FOLLOWED BY STACK OUT 5-6KLBS©9953 -CALL ODE AND DISCUSS PLAN FORWARD -MONITOR WELL,VERIFY 4BPH LOSSES, 8.5PPG MW IN AND OUT 22:30 - 00:00 1.50 FISH P DECOMP PULL UP ABOVE 7"LNR,SLIP AND CUT 60'OF DRILL LINE -CONTINUE T/CIRCULATE ACROSS THE TOP OF HOLE(LOSS RATE 4BPH) NO PUMP OPS THIS TOUR LOSSES TO WELL BORE AT MIDNIGHT= 55BBLS 9/8/2015 00:00 - 00:30 0.50 FISH P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT,CONTINUE T/SLIP AND CUT 60' OF DRILL LINE 00:30 - 01:00 0.50 FISH P DECOMP INSPECT SAVER SUB W/TP(GOOD) 01:00 - 07:00 6.00 FISH N DPRB DECOMP PJSM.POOH W/BAKER 3.75"MULTI-STRING CUTTER BHA#34 F/9868'MD T/BHA -MONITOR WELL,10 MINUTES,4 BPH LOSS RATE,8.5 PPG IN AND OUT 07:00 - 07:30 0.50 FISH N DPRB DECOMP CLEAN AND CLEAR RIG FLOOR 07:30 - 08:00 0.50 BOPSUR P DECOMP PULL WEAR RING,INSTALL TEST PLUG 08:00 - 09:30 1.50 BOPSUR P DECOMP R/U T/TEST ROPE,PERFORM BODY TEST (GOOD TEST) 09:30 - 12:00 2.50 BOPSUR P DECOMP TEST BOPE T/250PSI LOW,3500PSI HIGH F/5 CHARTED MINS EACH W/4",4.5",AND 7" JOINTS,4"JNT IN THE ANNULAR -AOGCC REP JEFF JONES WAIVED WITNESS T/TESTING LOSSES TO WELL BORE AT NOON=42BBLS MW=8.5PPG IN AND OUT 12:00 - 18:00 6.00 BOPSUR P DECOMP CONTINUE T/TEST BOPE T/250PS1 LOW F/5 CHARTED MINS AND 3500PSI HIGH F/5 CHARTED MINS W/4",4.5",AND 7"JNTS, ANNULAR W/4"JNT -AOGCC REP JEFF JONES WAIVED WITNESS T/TESTING 18:00 - 19:30 1.50 BOPSUR P DECOMP R/D BOPE TEST EQUIPMENT/CLEAN AND CLEAR RIG FLOOR,PULL TEST PLUG, INSTALL 9-1/16"WEAR RING 19:30 - 00:00 4.50 EVAL P DECOMP PJSM,P/U,M/U,HES 9-5/8"RTTS AND RIH ON 4"DP F/DERRICK DOWN T/8197'MD -PUW=167KLBS,SOW=128KLBS LOSSES T/WELL BORE AT MIDNIGHT= 7.2BBLS MW=8.5PPG IN AND OUT 9/9/2015 00:00 - 00:30 0.50 EVAL P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT Printed 10/12/2015 10:49:36AM • North America-ALASKA-BP Page 35 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth ' Phase Description of Operations (hr) (usft) 00:30 - 02:00 1.50 EVAL P DECOMP PJSM.CONTINUE TO RIH W/RTTS ON 4" DRILL PIPE. -RIH F/8197'-9300'.UP WT=190K,DOWN WT=135K. -ACQUIRE SLOW PUMP RATES:MP1=30 SPM @ 60 PSI,40 SPM @ 120 PSI. -MUD PUMP 2=30 SPM @ 100 PSI&40 SPM @ 200 PSI. -BREAK CIRCULATION AND RECIPROCATE PIPE.6 BPM/480 PSI. 02:00 - 03:00 1.00 EVAL P DECOMP PJSM.SET RTTS @ 9303'.SET 20K DOWN. -LINE UP TO TEST CASING,CHECK VALVE ALIGNMENT,REVIEW PRESSURE CROSS CHECK LIST. -CLOSE LOWER PIPE RAMS AND PRESSURE CASING TO 250 PSI/5 MIN AND 3500 PSI 30 MINUTES. -87 STROKES TO ACHIEVE FINAL PRESSURE, 5 PSI LOST IN 1ST 15 MINUTES AND ZERO PSI LOST IN SECOND 15 MIN. -GOOD TEST,BLEED OFF ALL PRESSURE, OPEN PIPE RAMS. 03:00 - 04:00 1.00 EVAL P DECOMP PJSM.CIRCULATE DRILL PIPE VOLUME @ 5 BPM/300 PSI. -MONITOR WELL,10 MINUTES,6.8 BPH LOSS RATE.8.5 PPG IN AND OUT. -PUMP DRY JOB,BLOW DOWN TOP DRIVE. 04:00 - 09:30 5.50 EVAL P DECOMP PJSM.POOH W/4"DRILL PIPE AND RTTS. 09:30 - 12:00 2.50 PULL N DPRB DECOMP M/U BAKER FISHING RCJB BHA#35 -PJSM,M/U SAFETY JOINT,M/U BUMPER SUB,(PIN ON B-SUB TORQUED OFF,SEE IR-5090134),M/U NEW B-SUB LOSSES TO WELLBORE©NOON=32BBLS MW=8.5PPG IN AND OUT 12:00 - 12:30 0.50 PULL N DPRB DECOMP SERVICE AND INSPECT RIG FLOOR/PIPE SKATE EQUIPMENT 12:30 - 13:30 1.00 PULL N DPRB DECOMP WELL CONTROL DRILL W/NON-SHEARABLE DC'S ACROSS BOPE 13:30 - 14:30 1.00 PULL N DPRB DECOMP CONTINUE T/M/U BAKER FISHING RCJB BHA #35 AS PER BAKER REP 14:30 - 20:00 5.50 PULL N DPRB DECOMP RIH W/BAKER FISHING RCJB BHA#35 ON STANDS OUT OF DERRICK T/9927'MD -PUW=218KLBS,SOW=150KLBS,ROT WT= 175KLBS @ 40RPM AND 9K FT-LBS TQ FREE TQ -DROP BALL ON SEAT AND PUMP AT 7BPM= 1260PSI 20:00 - 21:30 1.50 CLEAN N DPRB DECOMP WASH DOWN INSIDE 7"TBG T/9983'MD -PUMP @ 92 SPM,8 BPM,1550PSI,40 RPM, 8-9K FT-LBS TQ -STRING WEIGHT DROPPED 7-8KLBS AND TQ INCREASED T/10-12K FT-LBS(WEIGHT WOULD NOT FALL OFF,AND TORQUE WAS SMOOTH NOT ERRATIC) -INDICATIONS OF SETTING DOWN ON SEAL ASSEMBLY CROSS OVER -P/U AND DRY TAG AGAIN @ 9983'MD T/ CONFIRM -POOH T/9927'MD AND VERIFY TBG DID NOT MOVE(TAG UP ON 7"TBG TOP) Printed 10/12/2015 10:49:36AM • I North America-ALASKA-BP Page 36 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5;540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UVN:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 23:30 2.00 CLEAN N DPRB DECOMP CIRCULATE 3OBBL HIGH-VISC SWEEP 8BPM 1500PSI SURFACE T/SURFACE -MONITOR WELL F/10 MINS,VERIFY 3.6BPH LOSS RATE W/8.5PPG MW -BLOW DOWN TOP DRIVE 23:30 - 00:00 0.50 CLEAN N DPRB DECOMP POOH F/9927'MD T/9327'MD -PUW=207KLBS,SOW=150KLBS LOSSES T/WELL BORE AT MIDNIGHT= 42BBLS 8.5 PPG MW IN AND OUT 9/10/2015 00:00 - 00:30 0.50 CLEAN P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT 00:30 - 04:30 4.00 CLEAN N DPRB DECOMP CONTINUE T/POOH W/BAKER FISHING BHA #35 F/9327'MD-355'MD 04:30 - 06:00 1.50 CLEAN N DPRB DECOMP L/D BAKER FISHING BHA#35 -MONITOR WELL PRIOR T/PULLING BHA THROUGH STACK AND ONCE OUT OF HOLE, 8.5PPG IN AND OUT,WELL LOSING 3BPH 06:00 - 07:00 1.00 CLEAN N DPRB DECOMP CLEAN OUT WASH PIPE/RCJB,AND JUNK BASKETS -RECOVER 30 GALLLONS OF SCALE/METAL/SAND,80%OF THE 7"POWER CUTTER,FISH NECK OF THE STRING SHOT AND 6"OF STRING SHOT CARRIER 07:00 - 08:00 1.00 CLEAN N DPRB DECOMP CLEAN AND CLEAR RIG FLOOR 08:00 - 10:30 2.50 CLEAN N DPRB DECOMP M/U BAKER FISHING RCJB BHA#36 -PJSM,MONITOR WELL,3.2BPH LOSS RATE, 8.5PPG MW IN AND OUT -RIH F/SURFACE TI 325'MD 10:30 - 12:00 1.50 CLEAN N DPRB DECOMP CONTINUE T/RIH W/BAKER FISHING RCJB BHA#36 W/DP STANDS OUT OF DERRICK F/ 325'MD T/3358'MD -PUW=98KLBS,SOW=97KLBS LOSSES TO WELL BORE @ NOON=45BBLS MW=8.5PPG IN AND OUT 12:00 - 12:30 0.50 CLEAN N DPRB DECOMP SERVICE RIG FLOOR EQUIPMENT 12:30 - 15:30 3.00 CLEAN N DPRB DECOMP CONTINUE T/RIH W/BAKER FISHING RCJB BHA#36 F/3358'MD T/9886'MD -PUW=220KLBS,SOW=150KLBS 15:30 - 16:00 0.50 CLEAN N DPRB DECOMP DROP RCJB BALL,OBTAIN PARAMETERS @ 40 RPM -ROT WT=175KLBS,FREE TQ=8.5K FT-LBS, 8BPM=1100PSI 16:00 - 18:00 2.00 CLEAN N DPRB DECOMP RIH AND WORK THROUGH TOP OF 7"TBG W/ 10 RPM,CONTINUE WASHING DOWN T/TAG @ 9983'MD -WASH DOWN @ 4ORPM,8BPM, 1100-1350PSI,1-3KLBS WOB -CONTINUE DOWN T/9989'MD,LACK OF PROGRESS W/5-6KLBS WOB SMOOTH TORQUE -DISCUSS PLAN FORWARD W/ODE,OPS SUP,DECISION T/POOH Printed 10/12/2015 10:49:36AM • ! North America-ALASKA-BP Page 37 of 50 Operation Summary Report Common Well Name:J-03 J AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 20:30 2.50 CLEAN N DPRB DECOMP DROP CIR OUT SUB BALL AND ROD,PUMP 3OBBL HI-VISC SWEEP SURFACE T/SURFACE -7BPM,600PSI -POOH ABOVE 7"LNR TOP AND MONITOR WELL 10MINS,3.5BPH LOSS RATE,8.5PPG MW IN AND OUT 20:30 - 22:30 2.00 CLEAN N DPRB DECOMP SLIP AND CUT 60'OF DRILL LINE -CIRCULATE ACROSS TOP OF HOLE -CLEAN AND INSPECT SAVER SUB THREADS (GOOD) 22:30 - 00:00 1.50 CLEAN N DPRB DECOMP POOH F/9927'MD T/6011'MD -PUW=150KLBS,SOW=123KLBS LOSSES TO WELL BORE @ MIDNIGHT=53 BBLS MW=8.5PPG IN AND OUT 9/11/2015 00:00 - 00:30 0.50 CLEAN P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT 00:30 - 04:00 3.50 CLEAN N DPRB DECOMP CONTINUE T/POOH W/BAKER FISHING RCJB BHA#36 F/6011'MD T/325'MD -MONITOR WELL,LOSS RATE=2.5 BPH,MW =8.5PPG IN AND OUT 04:00 - 06:00 2.00 CLEAN N DPRB DECOMP L/D BAKER FISHING BHA#36,CLEAN AND CLEAR RIG FLOOR 06:00 - 06:30 0.50 CLEAN P DECOMP CLEAN AND CLEAR RIG FLOOR 06:30 - 07:30 1.00 CLEAN P DECOMP M/U BAKER MILLING BHA#37 -PJSM,MONITOR WELL,3 BPH LOSS RATE, 8.5PPG MW IN AND OUT -RIH F/SURFACE T/354'MD 07:30 - 12:00 4.50 CLEAN P DECOMP CONTINUE T/RIH W/BAKER MILLING BHA# 37 W/DP STANDS OUT OF DERRICK F/354'MD T/9900'MD -PUW=220KLBS,SOW=150KLBS LOSSES TO WELL BORE @ NOON=6OBBLS MW=8.5PPG IN AND OUT 12:00 - 13:00 1.00 CLEAN P DECOMP OBTAIN PARAMETERS AND SPRS PRIOR T/ ENTERING 7"TBG -@ 60 RPM,8.5K FT-LBS FREE TQ,ROT WT= 174KLBS,PUW=220KLBS,SOW=150KLBS _ 13:00 - 22:30 9.50 CLEAN P DECOMP WORK DOWN FROM THE TOP OF 7"@ 9927'MD T/TAG UP @ 9991'MD,BEGIN MILLING -MILL @ 60-70 RPM W/8-10K FT-LBS TQ, CIRC @ 5BPM 410-500PSI,1-7K WOB -MILL DOWN T/9997'MD BEFORE MILL BEGAN TO SHOW SIGNS OF SLOWING -CIRCULATE 2OBBL VISCOUS SWEEPS INTERMITTENTLY SURFACE T/SURFACE @ 10-12BPM=1500PSI -WORK MILLING PARAMETERS,APPLY 5-15KLBS WOB,VARY RPM BETWEEN 40-80 DOWN T/10,000'MD -DRY DRILL ON DEBRIS W/10-15KLBS WOB, SPIKE DRILL STRING ONTO DEBRIS SEVERAL TIMES T/ATTEMPT T/CREATE FORWARD PROGRESS -DECISION T/PULL MILLAFTER MILLING WAS CEASING TO ADVANCE F/10,001'MD Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 38 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task , Code NPT NPT Depth Phase Description of Operations (hr) - (usft) 22:30 - 23:30 1.00 I CLEAN P DECOMP CIRCULATE 4OBBL VISCOUS SWEEP ON BOTTOM,SURFACE T/SURFACE @ 11BPH= 1500PSI (SWEEPS NOT BRINGING MUCH VISIBLE MATERIAL BACK,DITCH MAGNETS FULL OF METAL SHAVINGS THOUGH) 23:30 - 00.00 0.50 CLEAN P DECOMP BLOW DOWN TOP DRIVE,L/D SINGLE, MONITOR WELL 10MINS,LOSSES SLOWED T/ 1.2BPH W/8.5PPG MW IN AND OUT -PUW=220KLBS,SOW=150KLBS LOSSES TO WELL BORE @ MIDNIGHT= 54BBLS 9/12/2015 00:00 - 00:30 0.50 CLEAN P DECOMP SERVICE RIG FLOOR EQUIPMENT 00:30 - 05:00 4.50 CLEAN P DECOMP POOH W/BAKER FISHING MILLING BHA#37 F/10,000'MD T/323'MD -MONITOR WELL F/10MINS BEFORE BHA ENTERS BOPE,LOSS RATE=1.5BPH,8.5PPG MW IN AND OUT 05:00 - 06:00 1.00 CLEAN P DECOMP LID BAKER FISHING MILLING BHA#37 AND ASSESS MILL CONDITION *MILL FOUND TO WORN AND SMOOTH, METAL MUNCHER CUTTING STRUCTURE ON BOTTOM OF MILL WAS GONE-NO IRREGULAR WEAR PATTERNS. 06:00 - 06:30 0.50 CLEAN P DECOMP CLEAN AND CLEAR RIG FLOOR. 06:30 - 08:00 1.50 CLEAN P DECOMP M/U BAKER MILLING BHA#38 -PJSM,MONITOR WELL,2 BPH LOSS RATE, 8.5PPG MW IN AND OUT -RIH F/SURFACE T/322'MD 08:00 - 12:00 4.00 CLEAN P DECOMP CONTINUE T/RIH W/BAKER MILLING BHA# 38 W/DP STANDS OUT OF DERRICK F/322'MD T/10,000"MD -PUW=217KLBS,SOW=150KLBS LOSSES TO WELL BORE©NOON=22BBLS MW=8.5PPG IN AND OUT 12:00 - 12:30 0.50 CLEAN P DECOMP SERVICE RIG FLOOR EQUIPMENT 12:30 - 00:00 11,50 CLEAN P DECOMP ESTABLISH MILLING PARAMETERS AND MILL F/10,000'MD T/10,002'MD -TAG TOP OF 7"STUMP©9927'MD -PUW=220KLBS,SOW=150KLBS,ROT WT_ 174KLBS,RPM=40-60,FREE TQ=8.5K FT-LBS,TAKE SPR'S -START MILLING W/3-5KLBS WOB,80RPM, 5BPM=500PSI(VERY LITTLE FOOTAGE) -INCREASE WOB IN STAGES OF 1KLBS UP T/ 10KLBS,VARY F/40-80RPM, -STACK WEIGHT UP T/20KLBS W/60-80RPM, -DRY MILL F/10 MINS©80RPM,THEN ATTEMPT T/MILL W/3-5KLBS WOB,4BPM= 220PSI (10002'MD REACHED) LOSSES TO WELL BORE @ MIDNIGHT= 27BBLS MW=8.5PPG IN AND OUT Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 39 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/13/2015 00:00 - 02:30 2.50 CLEAN P DECOMP CONTINUE MILLING W/BAKER FISHING MILLING BHA#38,F/10,002 T/10,003'MD -DRY DRILL F/10MINS W/18KLBS WOB -PROGRESSIVELY WORK WOB IN INCREMENTS OF 1KLBS,F/3KLBS-20KLBS, 60-80RPM -MILLING PROGRESS VERY LIMITED, DECISION T/POOH -P/U AND VERIFY TOP OF 7"TBG STUB (9927'MD).SET 8 KLBS AND WATCH FOR MOVEMENT,(NO MOVEMENT) 02:30 - 03:00 0.50 CLEAN P DECOMP L/D SINGLE T/GET BACK ON STANDS AND BLOW DOWN TOP DRIVE 03:00 - 03:30 0.50 CLEAN P DECOMP SERVICE/INSPECT TOP DRIVE 03:30 - 08:30 5.00 CLEAN P DECOMP POOH W/BAKER FISHING MILLING BHA#38 F/10,000'MD T/322'MD -MONITOR WELL F/10MINS BEFORE BHA ENTERS BOPE,LOSS RATE=1.5BPH,8.5PPG MW IN AND OUT 08:30 - 09:30 1.00 CLEAN P DECOMP UD BAKER FISHING MILLING BHA#38 AND ASSESS MILL CONDITION *MILL FOUND TO HAVE WEAR PATTERN CONSISTENT WITH JUNK TOWARDS THE CASING WALL-MINIMAL WEAR ON OUTSIDE EDGE INDICATING CROSSOVER NOT YET REACHED. 09:30 - 10:00 0.50 CLEAN P DECOMP CLEAR AND CLEAN RIG FLOOR 10:00 - 11:30 1.50 CLEAN P DECOMP M/U BAKER MILLING BHA#39 -PJSM,MONITOR WELL,2 BPH LOSS RATE, 8.5PPG MW IN AND OUT -RIH F/SURFACE T/322'MD 11:30 - 12:00 0.50 CLEAN P DECOMP CONTINUE T/RIH W/BAKER MILLING BHA# 39 W/DP STANDS OUT OF DERRICK F/322'MD T/9200''MD -PUW=220KLBS,SOW=150KLBS LOSSES TO WELL BORE©NOON=19BBLS MW=8.5PPG IN AND OUT 12:00 - 12:30 0.50 CLEAN P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT 12:30 - 16:30 4.00 CLEAN P DECOMP CONTINUE T/RIH W/BAKER FISHING MILL SHOE BHA#39 F/1738'MD T/9200'MD -PUW=220KLBS,SOW=150KLBS 16:30 - 18:00 1.50 CLEAN P DECOMP SLIP AND CUT DRILL LINE,INSPECT AND SERVICE DRAW WORKS,INSPECT SAVER SUB(GOOD) -MONITOR WELL,1.6BPH LOSS RATE W/ 8.5PPG MW IN AND OUT -CHECK CROWN-O-MATIC Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 40 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5;540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 CLEAN P DECOMP RIH T/9900'MD RECORD DRILLING PARAMETERS,WORK BACK T/BOTTOM AND MILL ON DEBRIS -ROT WT=178KLBS,RPM=40-60,FREE TQ= 8.5K FT-LBS,CIRC @ 5BPM=290PSI, RECORD SPR'S -TAG TOP OF 7"STUMP @ 9927'MD, CONTINUE MILLING T/10,004'MD @ 40-80 RPM,1-5KLBS WOB,9-11K FT-LBS TQ LOSSES TO WELL BORE @ MIDNIGHT=28 BBLS MW=8.5PPG IN AND OUT 9/14/2015 00:00 - 04:00 4.00 CLEAN P DECOMP CONTINUE T/MILL ON DEBRIS W/BAKER MILL SHOE BHA#39 @ 10,004'MD -40-60 RPM,5-10KLBS WOB,9-11K FT-LBS TQ,5BPM=330PSI -DECISON MADE TO POOH AND ASSESS BHA 04:00 - 09:30 5.50 CLEAN P DECOMP POOH W/BAKER MILL SHOE BHA#39 F/ 10004'MD T/317'MD -MONITOR WELL F/10MINS,LOSS RATE= 2BPH,8.5PGG MW IN AND OUT 09:30 - 10:30 1.00 CLEAN P DECOMP L/D BAKER MILLING BHA#39 AND ASSESS MILL CONDITION -MONITOR WELL F/10MINS BEFORE BHA ENTERS BOPE,LOSS RATE=2BPH,8.5PPG MW IN AND OUT *MILL FOUND TO HAVE WEAR PATTERN CONSISTENT WITH 7"SPINNING WITH BHA- MINIMAL INDICATIONS OF ANY WEAR CUTTING STRUCTURE 10:30 - 11:00 0.50 CLEAN P DECOMP CLEAR AND CLEAN RIG FLOOR 11:00 - 12:00 1.00 FISH P DECOMP M/U BAKER SPEAR BHA#40 -PJSM,MONITOR WELL,2 BPH LOSS RATE, 8.5PPG MW IN AND OUT -RIH F/SURFACE T/322'MD LOSSES T/WELLBORE @ NOON=16BBLS MW=8.5PPG IN AND OUT 12:00 - 12:30 0.50 FISH P DECOMP SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT. 12:30 - 18:00 5.50 FISH P DECOMP CONTINUE T/RIH W/BAKER SPEAR BHA#40 W/DP STANDS OUT OF DERRICK F/322'MD T/ 8565'MD -PUW=186KLBS,SOW=139KLBS 18:00 - 00:00 6.00 FISH N RREP DECOMP REPAIR TOP DRIVE LINK TILT PIN MOUNT LOSSES T/WELLBORE @ MIDNIGHT= 16BBLS MW=8.5PPG IN AND OUT 9/15/2015 00:00 - 00:30 0.50 FISH P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT 00:30 - 01:00 0.50 FISH P DECOMP RIH W/BAKER FISHING SPEAR ASSEMBLY F/ 8568'MD T/9892'MD Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 41 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UW:500292002500 Active datum:J-03 OKB©57.26usft(above Mean Sea Level) Date From-To Hrs ' Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 01:30 0.50 FISH P DECOMP ESTABLISH FISHING PARAMETERS,ENGAGE FISH W/SPEAR,PULL FREE©240KLBS -ACQUIRE SLOW CIRCULATING RATES. -PUW=215KLBS,SOW=150KLBS,3BPM= 12OPSI -FISH PULLS FREE W/240KLBS,P/U 5', CIRCULATE @ 5BPM=200PSI,SET BACK DOWN 5'AND SEE PRESSURE INCREASE T/ 350PSI INDICATING FISH IS RELEASED SAFETY JOINT 01:30 - 02:00 0.50 FISH P DECOMP B/D TD AND MONITOR WELL F/10 MINS,LOSS RATE=2 BPH,8.5PPG MW IN AND OUT 02:00 - 07:30 5.50 FISH P DECOMP POOH W/BAKER SPEAR BHA#40F/9927' 'MD T/276'MD 07:30 - 10:00 2.50 FISH P DECOMP L/D BAKER SPEAR BHA#40 WTH FISH. -MONITOR WELL F/10MINS BEFORE BHA ENTERS BOPE,LOSS RATE=2BPH,8.5PPG MW IN AND OUT *32.20'CUT JOINT 7"WITH GOOD CUT,42.24' FULL JOINT 7"AND.97'OF CROSSOVER RECOVERED BY SPEAR. 10:00 - 11:00 1.00 FISH P DECOMP BREAK DOWN SPEAR ASSY,CLEAR AND CLEAN RIG FLOOR. 11:00 - 14:30 3.50 BOPSUR P DECOMP R/U TO TEST BOPE. -FLUSH BOPE STACK. -R/U SECONDARY KILL LINE TO IA TO FILL WELL AT 2 BPH WHILE TESTING BOPE. -PULL WEAR RING. -INSTALL TEST PLUG. -R/U PRESSURE TESTING EQUIPMENT ON RIG FLOOR. LOSSES TO WELL BORE AT NOON=17 BBLS, 8.5 PPG BRINE. MW=8.5 PPG BRINE IN AND OUT. 14:30 - 19:30 5.00 BOPSUR P DECOMP PJSM.TEST FOUR PREVENTER 13-5/8"BOPE AND RELATED EQUIPMENT. -TEST BOPE ACCORDING TO AOGCC REGULATIONS,DOYON AND BP PROCEDURES. -TEST ANNULAR WITH 4"TEST JOINT TO 250 PSI LOW,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST UPPER 7"FIXED RAMS WITH 7"TEST JOINT TO 250 PSI,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST LOWER 3-1/2"X 6"VARIABLE RAMS WITH 4"AND 4-1/2"TEST JOINT TO 250 PSI, 3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST BLIND RAMS,FLOOR VALVES,AND CHOKE MANIFOLD TO 250 PSI,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST WITH FRESH WATER. -PERFORM ACCUMULATOR DRAW DOWN TEST WITH WSL PRESENT. CHUCK SCHEVE OF AOGCC WAIVED WITNESS OF BOPE TEST. 19:30 - 20:30 1.00 BOPSUR P DECOMP R/D BOPE TESTING EQUIPMENT. -BLOW DOWN SURFACE LINES. -CLEAR AND CLEAN RIG FLOOR. Printed 10/12/2015 10:49:36AM North America-ALASKA-BP Page 42 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Datemme:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT ! NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 23:30 3.00 FISH P DECOMP PJSM.M/U BAKER MILL BHA#41. -RIH FROM SURFACE TO 380'MD. 23:30 - 00:00 0.50 FISH P DECOMP RIH WITH BAKER MILL BHA#41. -RIH FROM 380'MD TO 664'MD.PUW=65 KLBS,SOW=68 KLBS. LOSSES TO WELL BORE AT MIDNIGHT=11 BBLS,8.5 PPG BRINE. MW=8.5 PPG BRINE IN AND OUT. NO SLOW CIRCULATING RATES THIS TOUR. 9/16/2015 00:00 - 00:30 0.50 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 00:30 - 06:00 5.50 FISH P DECOMP PJSM.RIH WITH BAKER MILL BHA#41. -RIH FROM 664'MD TO 9,952'MD. -FILL DRILL PIPE EVERY 2,000'. 06:00 - 12:00 6.00 FISH P DECOMP MILL AS PER BAKER REPRESENTATIVE. -ACQUIRE SLOW CIRCULATING RATES. -ESTABLISH PARAMETERS:PUW=220 KLBS, SOW=150 KLBS,ROT.WT.=182 KLBS,RPM =80-100,FREE TORQUE=9 FT-KLBS, TORQUE=10-14 FT-KLBS,WOB=1-10 KLBS, 7 BPM=640 PSI. -TAG AND WASH OVER SEAL ASSEMBLY AT 10,003'MD AND CONTINUE DOWN,NOTING DEBRIS ALONG THE WAY HAVING TO WORK THROUGH. -WORK DOWN TO SAFETY JOINT AT 10,030' MD AND MILL AS PER BAKER REPRESENTATIVE. -CONTINUE DOWN TO TOP OF PACKER AT 10,040'MD AND MILL AS PER BAKER REPRESENTATIVE.ONLY ABLE TO MILL—6". ATTEMPT TO CONTINUE MILLING DOWN BY ADJUSTING RPM AND WOB,UNSUCCESSFUL. -PUMP(3)20 BBL HI-VIS SWEEPS. FLUID LOSS TO WELL PAST(12)HOURS=21 BBLS 8.5 PPG BRINE. MW=8.5 PPG IN AND OUT. 12:00 - 13:00 1.00 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. PJSM.PUMP 30 BBL HI-VIS SWEEP SURFACE TO SURFACE. -PUMP AT 9 BPM=890 PSI. -SHUT DOWN AND MONITOR WELL FOR(10) MINUTES.LOSS RATE=1.4 BPH,8.5 PPG BRINE. 13:00 - 19:00 6.00 FISH P DECOMP PJSM.POOH WITH BAKER MILL BHA#41. -POOH FROM 10,040'MD TO 380'MD. -MONITOR WELL FOR(10)MINUTES.LOSS RATE=1.6 BPH. 19:00 - 21:00 2.00 FISH P DECOMP PJSM.L/D BAKER MILL BHA#41. -POOH FROM 380'MD TO SURFACE. -RECOVERED:3 GALLONS OF METAL DEBRIS FROM MAGNET AND BOOT BASKETS. Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 43 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UVI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To I Hrs Task 1 Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:00 - 22:30 1.50 FISH P DECOMP CLEAR AND CLEAN RIG FLOOR. -MOBILIZE BAKER OVERSHOT AND GRAPPLE BHA#42 TO RIG FLOOR. -MONITOR WELL FOR(10)MINUTES.LOSS RATE=1.2 BPH. 22:30 - 00:00 1.50 FISH P DECOMP PJSM.M/U BAKER OVERSHOT/GRAPPLE BHA #42. RIH FROM SURFACE TO 317'MD. FLUID LOSS TO WELL PAST(24)HOURS=64 BBLS 8.5 PPG BRINE. MW=8.5 PPG IN AND OUT. NO SLOW CIRCULATING RATES THIS TOUR. 9/17/2015 00:00 - 00:30 0.50 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 00:30 - 05:00 4.50 FISH P DECOMP PJSM.RIH WITH BAKER OVERSHOT/GRAPPLE BHA#42. -RIH FROM 317 MD 9,888'MD. 05:00 - 06:30 1.50 FISH P DECOMP PJSM.SLIP AND CUT 78'DRILLING LINE. -INSPECT DRAWWORKS. -ADJUST BRAKES. 06:30 - 12:00 5.50 FISH P DECOMP ENGAGE AND JAR FISH. -ACQUIRE SLOW CIRCULATING RATES. -PERFORM PRE-JARRING DERRICK INSPECTION. -ESTABLISH PARAMETERS:PUW=225 KLBS, SOW=155 KLBS,ROT.WT.=185 KLBS,RPM =20,FREE TORQUE=7 FT-KLBS. -ENGAGE FISH AT 10,003'MD,PUMP AT 3 BPM=200 PSI. -BEGIN JARRING AT 100-120 KLBS OVER STRING WEIGHT WITH STRAIGHT PULL TO 150 KLBS OVER STRING WEIGHT. -PERFORM DERRICK INSPECTIONS EVERY 15 HITS. -WORK PACKER FREE FROM 10,003'MD TO 9,951'MD WITH 60-80 KLBS OVERPULL. FLUID LOSS TO WELL PAST(12)HOURS=11 BBLS 8.5 PPG BRINE. MW=8.5 PPG IN AND OUT. 12:00 - 12:30 0.50 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 12:30 - 20:00 7.50 FISH P DECOMP PJSM.POOH WITH PACKER. -POOH FROM 9,951'MD TO 9,382'MD WITH TIGHT SPOTS NOTED,20-50 KLBS OVERPULL. -WORK THROUGH 9,382'MD,JARRING AT 100-120 KLBS OVER STRING WEIGHT WITH STRAIGHT PULL TO 150 KLBS OVER STRING WEIGHT. -POOH FROM 9,382'MD TO 317'MD WITH NO DRAG. -MONITOR WELL FOR(10)MINUTES.LOSS .....-..-- RATE=1.7 BPH. Printed 10/12/2015 10:49:36AM s • North America-ALASKA-BP Page 44 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Daterme:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. WWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 22:30 2.50 FISH P DECOMP PJSM.L/D BAKER OVERSHOT/GRAPPLE BHA #42 AND FISH. -POOH FROM 317'MD TO SURFACE. -L/D FISH,RECOVERED:PBR,SAFETY JOINT, 6'5-1/2"PUP AND 1'OF PACKER.TOTAL LENGTH OF FISH=38.76'.NO DEBRIS FOUND INSIDE FISH. DISCUSS OPTIONS WITH ODE,DECISION MADE TO PICK UP AND RIH WITH SPEAR TO ENGAGE PACKER. 22:30 - 23:00 0.50 FISH P DECOMP CLEAR AND CLEAN RIG FLOOR. 23:00 - 00:00 1.00 FISH P DECOMP PJSM.MOBILIZE BAKER TOOLS TO RIG FLOOR FOR BHA#43. FLUID LOSS TO WELL PAST(24)HOURS=21 BBLS 8.5 PPG BRINE. MW=8.5 PPG IN AND OUT. NO SLOW CIRCULATING RATES THIS TOUR. 9/18/2015 00:00 - 01:00 1.00 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. -INSPECT TOP DRIVE AND DERRICK POST JAR INSPECTION. 01:00 - 02:30 1.50 FISH P DECOMP PJSM.M/U BAKER SPEAR BHA#43. -RIH FROM SURFACE TO 332'MD. 02:30 - 05:30 3.00 FISH P DECOMP RIH WITH BAKER SPEAR BHA#43. -RIH FROM 332'MD TO 6,941'MD. 05:30 - 06:00 0.50 FISH P DECOMP KICK WHILE TRIPPING DRILL. -CREW RESPONDED IN A TIMELY MANNER, WELL WAS SECURED IN 3 MINUTES 15 SECONDS. -AAR WITH CREW IN DOG HOUSE. 06:00 - 07:00 1.00 FISH P DECOMP RIH WITH BAKER SPEAR BHA#43. -RIH FROM 6,941'MD TO 9,310'MD. 07:00 - 12:00 5.00 FISH P DECOMP PJSM.ATTEMPT TO PULL PACKER FREE. -ACQUIRE SLOW CIRCULATING RATES. -PERFORM PER-JARRING DERRICK AND TOP DRIVE INSPECTION. -ESTABLISH PARAMETERS:PUW=210 KLBS, SOW=150 KLBS,RPM=20,ROT.WT.=174 KLBS,FREE TORQUE=6 FT-KLBS,3 BPM= 160 PSI. -RIH AND ENGAGE PACKER AT 9,330'MD AS PER BAKER REPRESENTATIVE. -BEGIN JARRING AT 40-140 KLBS OVER STRING WEIGHT,WITH STRAIGHT PULL TO 150-160 KLBS. -PERFORMING DERRICK INSPECTIONS EVER 15 JAR HITS. FLUID LOSS TO WELL PAST(12)HOURS=13 BBLS 8.5 PPG BRINE. MW=8.5 PPG IN AND OUT. 12:00 - 12:30 0.50 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. Printed 10/12/2015 10:49:36AM • North America-ALASKA-BP Page 45 of 50 Operation Summary Report Common Well Name:J-03 j AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 16:00 3.50 FISH P DECOMP PJSM.ATTEMPT TO PULL PACKER FREE. -JARRING AT 40-140 KLBS OVER STRING WEIGHT,WITH STRAIGHT PULL TO 150-160 KLBS. -PERFORMING DERRICK INSPECTIONS EVER 15 JAR HITS. 16:00 - 17:00 1.00 FISH P DECOMP RELEASE FISH AS PER BAKER REPRESENTATIVE. -BLOW DOWN TOP DRIVE. -MONITOR WELL FOR(10)MINUTES.LOSS RATE=1 BPH,8.5 PPG IN AND OUT. 17:00 - 21:00 4.00 FISH P DECOMP PJSM.POOH WITH BAKER SPEAR BHA#43. -POOH FROM 9,330'MD TO 340'MD. -MONITOR WELL FOR(10)MINUTES.LOSS RATE=1.2 BPH,8.5 PPG IN AND OUT. 21:00 - 23:00 2.00 FISH P DECOMP• PJSM.L/D BAKER SPEAR BHA#43. -POOH FROM 340'MD TO SURFACE. -CLEAR AND CLEAN RIG FLOOR. 23:00 - 00:00 1.00 FISH P DECOMP PJSM.M/U BAKER MILL SHOE BHA#44. -RIH FROM SURFACE TO 216'MD. FLUID LOSS TO WELL PAST(24)HOURS=27 BBLS 8.5 PPG BRINE. MW=8.5 PPG IN AND OUT. NO SLOW CIRCULATING RATES THIS TOUR. 9/19/2015 00:00 - 05:00 5.00 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. PJSM.RIH WITH BAKER MILL SHOE BHA#44. -RIH FROM 216'MD TO 9,314'MD. 05:00 - 08:00 3.00 FISH P DECOMP PJSM.MILLING ON TOP OF PACKER. -ACQUIRE SLOW CIRCULATING RATES. -ESTABLISH PARAMETERS:PUW=205 KLBS, SOW=145 KLBS,RPM=20,ROT.WT.=172 KLBS,FREE TORQUE=6 FT-KLBS,10.5 BPM 1,180 PSI. -RIH AND TAG TOP OF FILL AT 9,329'MD. -MILL FILL FROM 9,329'MD TO 9,332'MD.SET DOWN 5 KLBS AND MILL FOR(30)MINUTES. -PUMP(2)30 BBL HI-VIS SWEEPS. -SPOT 40 BBLS STEEL LUBE PILL AT 9,332' MD. -MONITOR WELL FOR(10)MINUTES.LOSS RATE=1.2 BPH,8.5 PPG BRINE. 08:00 - 12:00 4.00 FISH P DECOMP PJSM.POOH WITH BAKER MILL SHOE BHA #44. -POOH FROM 9,332'MD TO 3,059'MD.PUW 95 KLBS,SOW=95 KLBS. FLUID LOSS TO WELL PAST(12)HOURS=14 BBLS 8.5 PPG BRINE. MW=8.5 PPG IN AND OUT. 12:00 - 12:30 0.50 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. CHECK CROWN-O-MATIC.OK. 12:30 - 14:00 1.50 FISH P DECOMP PJSM.POOH WITH BAKER MILL SHOE BHA #44. -POOH FROM 3,059'MD TO 343'MD. -MONITOR WELL FOR(10)MINUTES.LOSS RATE=1.1 BPH,8.5 PPG BRINE. Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 46 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) - Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 16:00 2.00 FISH P DECOMP PJSM.L/D BAKER MILL SHOE BHA#44. -POOH FROM 343'MD TO SURFACE. 16:00 - 18:30 2.50 FISH P DECOMP PJSM.M/U BAKER SPEAR BHA#45. -RIH FROM SURFACE TO 749'MD. 18:30 - 22:30 4.00 FISH P ] DECOMP RIH WITH BAKER SPEAR BHA#45. -RIH FROM 749'MD TO 9,277'MD.PUW=205 KLBS,SOW=160 KLBS. 22:30 - 00:00 1.50 FISH P DECOMP 'PJSM.SLIP AND CUT 74'OF DRILLING LINE. -INSPECT DRAWWORKS BRAKES. FLUID LOSS TO WELL PAST(24)HOURS=34 BBLS 8.5 PPG BRINE. 1 MW=8.5 PPG IN AND OUT. 9/20/2015 00:00 - 09:00 9.00 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. PJSM.ENGAGE FISH AND BEGIN JARRING. -RIH TO TOP OF FISH AT 9,329'MD. -ESTABLISH PARAMETERS:PUW=208 KLBS, SOW=160 KLBS. -ENGAGE FISH AS PER BAKER REPRESENTATIVE. -BEGIN WORKING AND JARRING FISH. -JAR DOWN TO FREE FISH AT 35 KLBS DOWN. -WORK FISH UP AND DOWN,FISH FREE BETWEEN 9,329'MD TO-9,360'MD UTILIZING DOWN JARS. -WORK FISH FREE DOWN THEN WORK BACK UP TO TIGHT SPOT AT 9,329'MD AND JAR AT 105 KLBS OVER,WITH STRAIGHT PULL TO 230 KLBS OVER.REPEAT THIS PROCESS-80 TIMES. -FISH FELL FREE FROM SPEAR,RIH TO 9,760'MD TO RE-ENGAGE FISH. -POOH WITH FISH FROM 9,760'MD TO 9,329' MD. -PULL 10 KLBS OVER INTO 9,329'MD TIGHT SPOT,WORK JARS UP AND DOWN IN ATEMPT TO FREE FISH FROM TIGHT SPOT FOR(1) HOUR. -DECISION MADE TO PUSH FISH TO BOTTOM. -PUSH FISH DOWN FROM 9,329'MD TO 10,032'MD.SET DOWN 25 KLBS TO VERIFY AND RELEASE FROM FISH.PUW=200 KLBS, SOW=180 KLBS. 09:00 - 10:00 1.00 FISH P DECOMP CIRCULATE WELLBORE. -PUMP 30 BBL HI-VIS SWEEP AT 10 BPM= 1,720 PSI. -ACQUIRE SLOW CIRCULATING RATES. -RIH AND RE-TAG TOP OF FISH AT 10,032'MD. BLOW DOWN TOP DRIVE. -MONITOR WELL FOR(10)MINUTES.LOSS RATE=1.7 BPH,8.5 PPG BRINE. Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 47 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) _ 1 Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 12:00 2.00 FISH P DECOMP PJSM.POOH WITH BAKER SPEAR BHA#45. -POOH FROM 10,032'MD TO 9,278'MD.PUW =190 KLBS,SOW=172 KLBS. -L/D DRILL PIPE TO SHED 1 X 1. FLUID LOSS TO WELL PAST(12)HOURS=20 BBLS 8.5 PPG BRINE. MW=8.5 PPG IN AND OUT. 12:00 - 12:30 0.50 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. -SERVICE RIG AND INSPECT EQUIPMENT. 12:30 - 13:00 0.50 FISH P DECOMP PJSM.POOH WITH BAKER SPEAR BHA#45. -POOH FROM 9,278'MD TO 9,173'MD. -L/D DRILL PIPE TO SHED 1 X 1. -M/U TO TOP DRIVE. 13:00 - 14:30 1.50 FISH P DECOMP CLEAN WELLBORE ACROSS PACKER SETTING DEPTH. -ESTABLISH PARAMETERS:RPM=60,4 BPM =320 PSI,ROT.WT.=175 KLBS,FREE TORQUE=3 FT-KLBS. -ACQUIRE SLOW CIRCULATING RATES. -PUMP 30 BBL HI-VIS SWEEP WHILE RECIPROCATING AND ROTATING PIPE. -WORK PIPE FROM 9,173'MD TO 9,085'MD. 114:30 - 00:00 9.50 FISH P DECOMP PJSM.POOH WITH BAKER SPEAR BHA#45. -POOH FROM 9,173'MD TO 2,930'MD. -L/D DRILL PIPE TO SHED 1 X 1. FLUID LOSS TO WELL PAST(24)HOURS=39 BBLS 8.5 PPG BRINE. MW=8.5 PPG IN AND OUT. 9/21/2015 00:00 - 00:30 0.50 FISH P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. 100:30 - 02:30 2.00 FISH P DECOMP PJSM.POOH WITH BAKER SPEAR BHA#45. -POOH FROM 2,930'MD TO 749'MD. -L/D DRILL PIPE TO SHED 1 X 1. -MONITOR WELL FOR(10)MINUTES.LOSS RATE=1.5 BPH,8.5 PPG BRINE. 02:30 - 04:30 2.00 FISH P DECOMP PJSM.L/D BAKER SPEAR BHA#45. -POOH FROM 749'MD TO SURFACE. -L/D BHA TO SHED. 04:30 - 05:30 1.00 WHSUR P DECOMP CLEAR AND CLEAN RIG FLOOR. -PULL WEAR BUSHING. 05:30 - 07:00 1.50 RUNCOM P RUNCMP R/U 4-1/2"TUBING EQUIPMENT ON RIG FLOOR. 07:00 - 12:00 5.00 RUNCOM P RUNCMP PJSM.RIH WITH 4-1/2"12.6#13CR-85 VAMTOP COMPLETION. -BAKER LOK ALL CONNECTIONS BELOW PACKER. -USING TORQUE TURN SERVICES,TORQING EACH CONNECTION TO 4,400 FT-LBS. -USING JET LUBE SEAL GUARD THREAD COMPOUND. -RIH FROM SURFACE TO 879'MD. FLUID LOSS TO WELL PAST(12)HOURS=18 BBLS 8.5 PPG BRINE. MW=8.5 PPG IN AND OUT. Printed 10/12/2015 10:49:36AM • • North America-ALASKA-BP Page 48 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 12:30 0.50 RUNCOM P RUNCMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. -SERVICE RIG EQUIPMENT. 12:30 - 00:00 11.50 RUNCOM P RUNCMP PJSM.RIH WITH 4-1/2"12.6#13CR-85 VAMTOP COMPLETION. -BAKER LOK ALL CONNECTIONS BELOW PACKER. -USING TORQUE TURN SERVICES,TORQING EACH CONNECTION TO 4,400 FT-LBS. -USING JET LUBE SEAL GUARD THREAD COMPOUND. -RIH FROM 879'MD TO 7,950'MD. FLUID LOSS TO WELL PAST(24)HOURS=42 BBLS 8.5 PPG BRINE. MW=8.5 PPG IN AND OUT. 9/22/2015 00:00 - 00:30 0.50 RUNCOM P RUNCMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. 00:30 - 03:00 2.50 RUNCOM P RUNCMP PJSM.RIH WITH 4-1/2"12.6#13CR-85 VAMTOP COMPLETION. -USING TORQUE TURN SERVICES,TORQING EACH CONNECTION TO 4,400 FT-LBS. -USING JET LUBE SEAL GUARD THREAD COMPOUND. -RIH FROM 7,950'MD TO 9,925'MD. 03:00 - 04:30 1.50 RUNCOM P RUNCMP PJSM.LAND TUBING HANGER. -M/U LANDING JOINT TO HANGER.PUW=145 KLBS,SOW=133 KLBS. -CAMERON RILDS. -L/D LANDING JOINT. 04:30 - 09:30 5.00 RUNCOM P RUNCMP PJSM.CIRCULATE WELL WITH MI KI-3869 CORROSION INHIBITOR. -R/U AND PRESSURE TEST SURFACE LINES TO 250 PSI LOW,3,500 PSI HIGH FOR(5) MINUTES.GOOD TEST. -REVERSE CIRCULATE DOWN IA TAKING RETURNS UP 4-1/2"TUBING. -PUMP 520 BBLS OF 8.5 PPG BRINE WITH CORROSION INHIBITOR AT 3 BPM=350 PSI. -SHUT DOWN AND PUMP 5 BBLS 8.5 PPG BRINE DOWN TUBING TO CLEAR ROD AND BALL SEAT OF ANY DEBRIS. Printed 10/12/2015 10:49:36AM • 4111 North America-ALASKA-BP Page 49 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:30 - 12:00 2.50 RUNCOM P RUNCMP PJSM.SET BAKER PACKER. -DROP BALL AND ROD. -PRESSURE UP ON TUBING TO SET PACKER AS PER BAKER REPRESENTATIVE. -PRESSURE TEST TUBING TO 250 PSI LOW, 3,500 PSI HIGH FOR(30)CHARTED MINUTES. PASSES BP TESTING CRITERIA. BLEED TUBING PRESSURE DOWN TO 2,000 PSI AND HOLD. -PRESSURE TEST IA TO 250 PSI LOW,3,500 PSI HIGH FOR(30)CHARTED MINUTES. PASSES BP TESTING CRITERIA. -VERIFIED TEST AND GIVEN APPROVAL TO PROCEED FROM WTL RICH BURNETT. -BLEED PRESSURE OFF TUBING AND SHEAR DCR VALVE. -PUMP 5 BBLS 8.5 PPG BRINE BOTH WAYS TO VERIFY SHEAR. FLUID LOSS TO WELL PAST(12)HOURS=6 BBLS 8.5 PPG BRINE. MW=8.5 PPG IN AND OUT. 12:00 - 16:00 4.00 RUNCOM P RUNCMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. PJSM.FREEZE PROTECT WITH LRS. -R/U LRS TO IAAND PRESSURE TEST LINES TO 250 PSI LOW,3,500 PSI HIGH FOR(5) MINUTES.GOOD TEST. -REVIEW PRESSURE CROSSCHECK LIST WITH LRS AND CREW,ALL CHALLENGE QUESTIONS ANSWERED CORRECTLY. -REVERSE CIRCULATE DOWN IA180 BBLS 100°F 6.8 PPG DIESEL. -PUMP AT 1.7 BPM=365 PSI. 16:00 - 17:00 1.00 RUNCOM P RUNCMP OPEN VALVE BETWEEN IAAND TUBING AND ALLOW DIESEL TO U-TUBE FOR(1)HOUR. _ 17:00 - 18:00 1.00 RUNCOM P RUNCMP PJSM.CAMERON DRY ROD SET TWC. -SET TWC. -PRESSURE TEST FROM BELOW TO 250 PSI LOW,3,500 PSI HIGH FOR(5)CHARTED MINUTES.GOOD TEST. -PRESSURE TEST FROM ABOVE TO 250 PSI LOW,3,500 PSI HIGH FOR(5)CHARTED MINUTES.GOOD TEST. 18:00 - 20:00 2.00 RUNCOM P RUNCMP BLOW DOWN LINES. -R/D LRS. -R/D SQUEEZE MANIFOLD IN CELLAR. 20:00 - 00:00 4.00 RUNCOM P RUNCMP PJSM.CHANGE UPPER RAMS TO 9-5/8" FIXED. -OPEN DOORS ON BOPE,CLEAN AND INSPECT. -CHANGE OUT UPPER RAMS TO 9-5/8"FIXED. 9/23/2015 00:00 - 04:00 4.00 BOPSUR P RUNCMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. PJSM.OPEN RAM DOORS. -CLEAN AND INSPECT. -N/D BOPE.M/U 13 5/8"SPACER SPOOL. Printed 10/12/2015 10:49:36AM • North America-ALASKA-BP Page 50 of 50 Operation Summary Report Common Well Name:J-03 AFE No Event Type:WORKOVER(WO) Start Date:8/14/2015 End Date:9/23/2015 X4-010J0-E:(5,540,000.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 16 Spud Date/Time:11/13/1969 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292002500 Active datum:J-03 OKB @57.26usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 08:00 4.00 WHSUR P RUNCMP PJSM.CLEAN AND INSPECT HANGER.N/U ADAPTER FLANGE. -PRESSURE TEST HANGER VOID AND SEALS.250/5000 PSI/30 MINUTES. -PERFORM A 5 MINUTE 250PSI LOW/5000PSI HIGH VISUAL LEAK TIGHT TEST ON THE TREE. SECURE THE TREE AND CELLAR. -RIG RELEASED @ 08:00 9/23/2015. Printed 10/12/2015 10:49:36AM • • Nill O O w E N N CLiQ t d m Q m Of a 0 W = = fa J - d N W O -j _ N c O)W 0 ill2 m ~ m o d Q = (D C 4)a) Z Q ~ c p >O ' uu ° > ta a aiv � co CO W O E nt O a) ° cc 0E J X X XO O0. n cn) .n Y J J Jau0 ON Oa o (n ` E �. Q Q Q UU Up 'L oTO N N Z 00 2 a) d L.L. O U av > OZ y 0N O CO LO U H O .-. ( N O n u) a1 0 m O L 2 co- > a) E ❑ N (N O N N N 0 O z c x C U o0 E ❑ ❑ w r LL N a) v N a) 2. E C N Q c u) o u z o E )- d W O - ❑ 2 !n Q r 2 X H 13-, 2 > o 4) N Cc Q U) = ) CO0 a c O (I) E c J 0 o a) c g ,_ a = 2 c -o 'o 0 U) o ui > d 0 -E a a) N )Q- o m a` •E.32. • N o - E m u) _ a N N ai c LL a (7 a, W 5 ❑ o d co y J 2a .n. >JO , E '-‘,.i- O CO O 0 ❑ ,5E am n Y ° ua) � EQ O a m c nc a N w > a C 0- (I) W Oo c 0 - ,n w m 'CI (a IX > E ao N E o p a� x x 3 > aa) w a m' v Qco w N 0 al 0 ❑ W W U) a > d C m c o c p_ - :r a) 0 a) U H 7,2 C a N o O) U N d c'o ar U m _m Q C o 2 z E x N d ai 'a L'' ° m 3 Q y vn) C7 E g .a Q a o O a co � V m m cc a) Cir- a, a in Z Y C H dCNI > Z u) O O w _ a) o p co :° U) m C) m o N ❑ O u! U) 0) .0 ❑. CO ❑ = 04 d 2 N W O ' o N O U N N a a0 z E c U) U N co -O D. _7 I r N a) O) O i N O) 3 a U) co; a) E -a 5 c a! ❑ al N a) N C Z > 0 n 0• v °l. 9rn u H 0 in K Q MI C m . o ai Cl) D_ cc E cc ~ H N 1. rn N O .0 C z EO cu a) .- (p S > w.. o ❑ (7 0 ( C E a) ,Sa ) c w Q Z Y m 3 N al a 0 2 5 H ❑ 0 as � OJ w �. N o III LL W m N C l0 Z < NI- � rn a v > .N a) - Q ❑ O l'2 m ¢ ❑ a m W v v 2 a ( MU7 H a) N E o_.9" Nz = w ,n � o 0Nw onz F- 2 Y rn z p i.; Lu a w o E > a = O co U z w ¢ o w Z m o m a O J Q Z W W M co M 5 a) >• H CC J U) 0 0 6. j o H W C) W a' Z' c @ E O) .O N >. ❑ O CO w V) Z Z @ w 0. cc N E m Y Z0 ._ > m a) a' N 0 E o (a okr O N a c co E m m 7 Z L O 0 o a c - H Q ° J _ co 2 1 d 0 N o u) E E a) a) °c_) a) 5 J N N 13 E2 LI Q Oc a O. O O 0 D O H co E O jiti (n a H m0 - H o▪ on c• ° 0) 0 a a 0 T O 0c vi aZH 0 az aE .41 c .. acu Zm NH N. (n O m 0 — z° > O SE E aTi .0a d -o. Y -O N dY d' co O C m0 0 0 N O a w U ° U U a ti vmO 7 0 0 N a) 0) fa N CO N ii ƒ \ \ 12 0 ; 3 , _ - I % a \ \\ \ \ / / ! :toza .-7.I\ � < k e co 0 \ \ z z E) \ // i , B j co _ 0 8 g � — - 0. ` f \ J w k > — � / \ CO \ \ \ k } ! C ` ; .- - [ 7 q ' ) k a } } } / & { $ . § u r { ■ ® I § fee $ E k 2 / e \ 0 z \ § \ 0 I H « a) I z 2 ) § § o § 2 ) ) ƒ 1 ) k § ] — z ° — � R 0 § m co k < k / f 1 4a2)\ / } \ } 2 Co) co ) § » N / & z, Ts4 z z k) § ^ z ) E& o / to co \\co \/ \ § 1 zkd\ 2k 13 k § » # k e ƒ 2 a . k ° J 3 ® ) \ / k \ \ \ \ 8 { o \ ) CL TREE= CNV H 4-1/16- Ill -1/16" EAD= CNV J-0 3 NOTES: CHROME TBG ACTUATOR= BAKER C I WJJ- 1 KB BEa/= 5726' .. BE B_EV= 35.76' �' l ` I KOP= 2800' • 1:),V } 2178' -{s-5r8'HES ES CEMENTER Max Angle= 38°@ 5000' '` _i;:,<rel 2189' -4-1/2"OTIS X NP,D=3.813" Datum MD= 9894' r1."" 2201' -19-5/8"BKR ISOZONE EXT CSG PKR Datum TVD= 8800'SS ►Z� 2224' -9-5/8"X 10-3/4"XO,ID=8.660" 13-3/8"CSG STUB(08/20/15) - 1948' r )----: 20"CSG,94#/133#,H-40/K-55,ID=19.124" H 2071' 2403' -10-3/4"X 9 5/8"XO 9 5/8'CSG,47#,L-80 VAM TOP,D=8.861" H 2224' GAS LIFT MANDRELS 10-3/4'BOWEN CSG PATCH,D=11.010" -{ 2226'_2230' ST MD ND DEV TYPE VLV LATCH PORT DATE I ,I 5 3342 3313 25 MMG DCR-1 RKP - 09/22/15 t� 4 5938 5426 37 MMG DMY RK 0 09/22/15 3 7011 6303 33 MAG DMY RK 0 09/22/15 13-318"CSG,61/68#,K-55,D= 12.515" -1 4447' b. 2 7877 7063 25 MMG DMY RK 0 09/22115 1 8909 7994 26 MAG DMY RK 0 09/22/15 Minimum ID =3.813"@ 2189' -- 4981' -19-5/8"DV COLLAR 4-1/2" OTIS X NIPPLE 8989' H4-1/2"OTIS X NP,D=3.813" lc 9019' -I9-5/8'X 4-1/2"HYD S3 PKR,D=3.875" 9052' -14-1/2"OTIS X NP,D=3.813" 4-1/2"TBG, 12.6#,13CR-85 VAM TOP, H 9916' ` ' .0152 bpf,D=3.958" I 9916' -14-1J2"WLEG,D=3.958 PERFORATION SUMMARY REF LOG:BI-ICS ON 01/01/70 10032' -FISH:9-5/8"X 5-1/2"PKR&TAIL PPE ASSY ANGLE AT TOP F . 32°@ 9980' - (09/20/15) t'bte:Refer to Production DB for historical perf data SCE SPF INTERVAL Opn/Sqz SHOT SQZ \ 2-7/8 4 9856-9896 S 11/20/88 2-7/8" 4 9920-9952 S 11/20/88 3-3/8" 4 9980- 10080 0 08/21/97 10150' 143'OF TBG TAR_w lPLUG IN XN MP CUT 3-3/8" 4 10080-10110 S 05/01/90 (OFF 04/12/77.' 3-3/8/8"'DG RAN TO 10150' 10220' -7"BRUSH(OR PECES) PBTD - 10291' _ FED TO BTM (01/24/79) :11 w 9-5/8'CSG,47#,N-80,D=8.681" H 10334' Y' �' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY MIT 04111177 ORIGINAL COMPLETION WELL J-03 09/23/15 D-16 RNO - PERMIT RMT No: 1690450 09/25/15 JMD DRLG HO CORRECTIONS AR No: 50-029-20025-00 09/28/15 SARJMD RNAL ODE APPROVAL SEC 9,T11N,R13E,860'FNL&1245'FEL BP Exploration(Alaska) • • PTO /629 - 04 5— Loepp, Loepp, Victoria T (DOA) From: McLaughlin, Sean M <Sean.McLaughlin@bp.com> Sent: Tuesday, September 22, 2015 10:02 AM To: Loepp, Victoria T (DOA) Subject: J-03 Sundry revision PTD 169-045 Attachments: 1-03 post rig_draft.pdf Follow Up Flag: Follow up Flag Status: Flagged Victoria, Doyon 16 is currently wrapping up operations on J-03. We were unable to recover the packer and tail pipe. After—2 weeks of unsuccessful fishing attempts the packer was left on bottom. We were not able to run the cemented scab liner as planned. We will try to flow the well but likely this well will end up with a coiled tubing sidetrack in the near future. Regards, sean Sean McLaughlin BP Workover Engineer 564-4387 Office 223-6784 Cell SCONE AU 5 1 6 2016 1 In • .... O I O Q c p0 r r r r N u _0 o w G' m (C1')4 Q aJ N O V • 1•-. a '`� C C F Z r r r r r r r r r r r OD ,�, ' > • V O @ o 0 C O L .0 _O J-, C (D N Q Q l7 r r r s E L m O J 7 -1a Z 01 01 O. >hC Z Q Q0 a v >C D OO E CC i- 0 7 7 7 0 0 0 0 0 0 0 0 a au c L O- •' .. J J J J J J J J J J J >. w w w w w w w w w w w qOp = � O M- LL LL LL LL LL LL Li. LL LL LL LL L a1 E 'p 'n t1 Q J J J J J J J J J J J +' N 0 C CI CC) I- Q Q Q Q Q Q Q Q Q Q Q O" C O rn O Z Z Z Z Z Z Z Z Z Z Z `n -0 'n CI) N 0 • LL LL LL LL LL LL LL LL LL LL LL 0) C_J • Li C To > i a1 > E a) a) 0 0 q- 0 _ i,,, a a -o V H • C O Q! ~ = O. J 40 I- > > C C Z u 2 U a O cu L../ U 2 Q v > U dO 0 2 0 Ll V Ll V N O O 2 ~ m 0 ▪ U -i y :- d d 7 d a cii U a C E» O , < W a a w� a a m U ' ? r a IA V co -:-1 "15') 0:1 cil ea E4 � 4d W � � � � � cecc xce � ado 5 a 0 0 0 0 J 0 0 J 0 0 0 . co M cc z 2 E 2 2 2 2 2 2 2 Z R 2 W V W W W W W W w w w 0 IF 1 w Q Q Q Q Q Q Q Q Q Q ISI 2 CO m CO cn CO CO m CO CO CO m Q w w w 2 w w w w w w w Z 0 0 0 Q 0 0 0 0 0 0 0 0 2 21 -J 2 2 2 2 2 2 2 J 0 0 0 0 0 0 0 0 0 0 0 a) "' 7 7 7 0. 7 7 7 7 7 7 7 w W rzre rew x w ceixix I LiCL O a O a a a a O a m .� W W O O O N N O 00 h r al N O : ) • s 0 '. O 1n r N W O - N O N 47. pa �_ 4:'V O 0 0 0 ,- 0 0 0 0 0 0 0 ~O m wro 0 0 0 0 0 0 0 0 0 0 0 ui C / v o 0 O 2 N 2 2 0 L 2 O �p Q t.r > r•-. •,- X > m > > com > X ...4.1s°°` 4/1 .MS 0A ill CC) CL O O . O O O m u ir 0 0 <O O0 0 0 0 0 0 0 ✓ M CO V N W r 06 O O 6 4- t cr O <1 V M N 00 CO OO N 0 N A N r M V' 0 V' M In CO N CO CO 'O N N N 0 M 0 CO O r N O N I > NNNNNNNNNNNN m 0 0 0 0 0 0 0 O) O O O E C QQ1 N N N N N N N N N N N of O O O O O O O O O O O E 6 O O O O O O 0 O O O (0 O in N O N in N In N N in N Al Y m O 1'e �t 'a i L1 �0) W Z E u E o W GI O rn OD w Y N cG �+ u r-1 .1=1J W 4J r-I Q ▪ J N M IA H O M O E N 2' m M Z M 0 0 0 O N 0 �' = I; rn LL Cl 2 ZU o o E Z N = U 10 I= I r1 Lx C 4p u 0 CO. f w d °: F- a s m Loepp, Victoria T (DOA) From: McLaughlin, Sean M <Sean.McLaughlin@bp.com> Sent: Saturday, August 22, 2015 5:30 PM To: Loepp, Victoria T(DOA) Cc: Regg, James B (DOA);AK, D&C Rig 16 Well Site Leader; Madsen, Alan D Subject: RE:J-03 Revised plan for pulling 10-3/4" casing without BOPE Follow Up Flag: Follow up Flag Status: Flagged Victoria, NF,® MAR 1 5 2016 • Doyon 16 will require an extension to the BOPE test. We have recovered the 10-3/4"casing and currently pulling the 13-3/8" casing. Both operations have taken multiple cuts and spear runs. We still need to remove the OOA casing spool and fish the 16" casing string. There are not power tongs available for the 16"on the slope so we will-rivet'to Wachs cut each joint. I hope to be nippling up the wellhead and BOPE in 3 days(25th). The test is due tomorrow night (23rd). I will have the wellsite leader update the slope inspector as well. Regards, sean From: Loepp, Victoria T(DOA) [nailto:victoria.loeppOalaska.gov] Sent: Wednesday, August 19, 2015 3:03 PM To: McLaughlin, Sean M Cc: Regg, James B (DOA) Subject: RE: J-03 Revised plan for pulling 10-3/4" casing without BOPE Sean, Thank you for the update. The revisions to the approved sundry outlined below are approved. Let me know if an extension will be needed on the next BOPE test. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loeppaalaska.qov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loepp@alaska.gov 1 • • From: McLaughlin, Sean M [mailto:Sean.McLaughlin@ bp.com] Sent: Wednesday, August 19, 2015 10:50 AM To: Loepp, Victoria T(DOA) Subject: 3-03 Revised plan for pulling 10-3/4" casing without BOPE Victoria, Doyon 16 is currently working on well 1-03. We are not able to pull the 10-3/4" casing. At this time we believe the casing is stuck at the wellhead. Our plan forward is outlined below. It differs from the Sundry in that we will need to nipple down the BOPE prior to pulling the 10-3/4" casing. The plan was to ND BOPE prior to pulling the 13-3/8" and 16" casing strings. The barriers to the reservoir are already in place. I suspect each step of the wellhead decomplete will be troubling due to the age of the equipment (1969 vintage). Also,the wellhead decomplete will likely span the next BOPE test(8/23/15). It is possible we will not have a wellhead nippled up by then to test our BOPE. I suspect pulling the 13-3/8" and 16" casing string will be problematic. The BOPE test will be performed as soon as we nipple the wellhead back up. Current Status: Unable to pull 10-3/4" casing from wellhead slips after reaching maximum surface pull. There is—12" of wellhead movement indicating the 20" and/or 13-3/8" casing strings are parted. We are not able to effectively jar at surface. Barriers to reservoir: TTP/Packer and RBP(both tested) Revised plan: ND BOPE, cut 10-3/4" casing at surface, remove 10-3/4" casing spool, spear and recover 10-3/4" casing. Details: 1. ND and stand back BOPE 2. Remove drilling spool 3. PU multi-string cutter and cut 10-3/4" casing at the landing base(below the 000A annulus). Prior to cutting ensure there is sufficient room to lift the OA spool with"'4'of casing hanging out the bottom. 4. Nipple down the OA spool. Use caution as the 13-3/8'casing may want to grow. Loosen all bolts in a controlled manor to determine if the OA head is being forced up by the 13-3/8" casing. If necessary, use longer bolts and the hrdratight system to allow controlled growth of the OA casing spool. 5. Send casing spool to the machine shop to recover the 10-3/4" stub and slips. The plan is still to use the spool as a conductor extension. 6. PU 10-3/4"spear and pull casing to the cut at 2235'. 7. Resume original plan (log cement top, cut and pull 13-3/8" casing, pull 16"casing) sean Sean McLaughlin BP Workover Engineer 564-4387 Office 223-6784 Cell 2 • PTA Loepp, Victoria T (DOA) From: Loepp, Victoria T (DOA) Sent: Wednesday, August 19, 2015 3:03 PM To: 'McLaughlin, Sean M' Cc: Regg,James B (DOA) Subject: RE:J-03 Revised plan for pulling 10-3/4" casing without BOPE PTD 169-045 Sean, Thank you for the update. The revisions to the approved sundry outlined below are approved. Let me know if an extension will be needed on the next BOPE test. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska SCANNED MAR 0 92016 Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp a.alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loeoo@alaska.gov From: McLaughlin, Sean M [mailto:Sean.McLaughli_n@bp.com] Sent: Wednesday, August 19, 2015 10:50 AM To: Loepp, Victoria T(DOA) Subject: J-03 Revised plan for pulling 10-3/4" casing without BOPE Victoria, Doyon 16 is currently working on well J-03. We are not able to pull the 10-3/4" casing. At this time we believe the casing is stuck at the wellhead. Our plan forward is outlined below. It differs from the Sundry in that we will need to nipple down the BOPE prior to pulling the 10-3/4" casing. The plan was to ND BOPE prior to pulling the 13-3/8" and 16" casing strings. The barriers to the reservoir are already in place. I suspect each step of the wellhead decomplete will be troubling due to the age of the equipment(1969 vintage). Also,the wellhead decomplete will likely span the next BOPE test(8/23/15). It is possible we will not have a wellhead nippled up by then to test our BOPE. I suspect pulling the 13-3/8" and 16" casing string will be problematic. The BOPE test will be performed as soon as we nipple the wellhead back up. Current Status: Unable to pull 10-3/4" casing from wellhead slips after reaching maximum surface pull. There is—12" of wellhead movement indicating the 20" and/or 13-3/8" casing strings are parted. We are not able to effectively jar at surface. 1 Barriers to reservoir: TTP/Packer and RBP (both tested) Revised plan: ND BOPE, cut 10-3/4" casing at surface, remove 10-3/4" casing spool, spear and recover 10-3/4" casing. Details: 1. ND and stand back BOPE 2. Remove drilling spool 3. PU multi-string cutter and cut 10-3/4" casing at the landing base (below the 000A annulus). Prior to cutting ensure there is sufficient room to lift the OA spool with-4' of casing hanging out the bottom. 4. Nipple down the OA spool. Use caution as the 13-3/8' casing may want to grow. Loosen all bolts in a controlled manor to determine if the OA head is being forced up by the 13-3/8" casing. If necessary, use longer bolts and the hrdratight system to allow controlled growth of the OA casing spool. 5. Send casing spool to the machine shop to recover the 10-3/4" stub and slips. The plan is still to use the spool as a conductor extension. 6. PU 10-3/4" spear and pull casing to the cut at 2235'. 7. Resume original plan (log cement top, cut and pull 13-3/8" casing, pull 16" casing) sean Sean McLaughlin BP Workover Engineer 564-4387 Office 223-6784 Cell 2 vcR-045 „` 2Ga6� BAKER PRINT DISTRIBUTION LIST HUGHES COMPANY BP Exploration Alaska,Inc. INTERMEDIATE FINAL Yes (mandatory) DATA LOGGED WELL NAME J-03 RUN NUMBER 1 Z /ZlizoiS (mandatory) K. BENDSR FIELD Prudhoe Bay Unit BH SALESMAN Paul Canizares (mandatory) (mandatory) COUNTY North Slope y� BH DISTRICT Prudhoe Bay,AK (mandatory) 1i E(E.I\E D (mandatory) STATE Alaska � PAGE 1 OF 1 (mandatory) JUL 2 4 2015 LOG DATE: July 3,2015 TODAYS DATE: 7/22/2015 (mandatory) AOGCC DISTRIBUTION LIST AUTHORIZED BY: �^�Paul Canizares (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY A B C D ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) L.I.S. FILM PERSON ATTENTION #OF PRINTS#OF COPIES#OF COPIES#OF COPIES#OF COPIES#OF COPIES 4 J il 4 U 4 4 1 ConocoPhillips Alaska Inc. 1 I 1 1 1 Attn:Ricky Elgaricio A= J-03_RPM_PNC3D_RAW_03JUL2015_BHI.meta ATO 3-344 J-03 RPM CO RAW 03JUL2015 BHI.meta 700 C Street Anchorage,AK 99510 B= *(Folder 1 on cd/dvd) J-03_RPM_PNC3D_RAW_03JUL2C J-03_RPM_CO_RAW_03J U L2015_ 2 ExxonMobil,Alaska 1 1 1 1 I Attn:Lynda M.Yaskell and/or Lisa Boggs 3201 C Street,Suite 505 Anchorage,AK 99503 3 State of Alaska-AOGCC I 1 I 1 1 1 I I Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 4 DNR-Division of Oil&Gas 0 I 0 1 1 I I Attn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 5 I I I I I SCANNED JUL 2 7 2015 TOTALS FOR THIS PAGE: 3 3 4 4 0 0 TOTALS FOR ALL PAGES: 3 3 4 4 0 0 THE STATE Alaska Oil and Gas 77.1,<OF foAj\ J(j\ Conservation Commission I - ___ - 333 West Seventh Avenue ;. GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279 1433 Op,ALASiiFax: 907 276 7542 �� 1 )\A M �� www aogcc.alaska.gov David Bjork ( ��' Engineering Team Leader Q`T— BP Exploration(Alaska), Inc. V P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU J-03 Sundry Number: 315-292 Dear Mr. Bjork: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision,or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, ‘1_1dP "1,(1 Cathy v Foerster Chair DATED this 27 day of May, 2015 Encl. STATE OF ALASKA1.1 R ji, ALA6.„A OIL AND GAS CONSERVATION COMP,...JION APPLICATION FOR SUNDRY APPROVAL '.1,AY Y 2 LJ �-5 siz, 1 /S 20 AAC 25.280 R 1. Type of Request. . .-O CC ❑Abandon 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Change Approved Program ❑Suspend . ®Plug Perforations • 0 Perforate 0 Pull Tubing 0 Time Extension ❑Operations Shutdown 0 Re-Enter Suspended Well 0 Stimulate 0 Alter Casing ®Other Scab Liner `-e e 0.>t" 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration(Alaska)Inc. 0 Exploratory 0 Stratigraphic 169-045 • 3. Address: ® Development 0 Service 6. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 50.029-20025-00-00 7. If perforating: 8. Well Name and Number What Regulation or Conservation Order governs well spacing in this pool? PBU J-03 • Will planned perforations require a Spacing Exception? 0 Yes—El No 9. Property Designatior 10 Field/Pool(s): ADL 028281 • Prudhoe Bay/Prudhoe Bay • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft). Total Depth TVD(ft): Effective Depth MD(ft) Effective Depth TVD (ft): Plugs(measured): Junk(measured) 10356' • 9250' 10249' 9159' 9478' 10150', 10220' Casing Length Size MD TVD Burst Collapse Structural 85' 30" 23'- 108' 23'- 108' Conductor 2049' 20" 22'-2071' 22'-2071' 1530/2320 520/1500 Surface 2003' 16" 21'-2003' 21'-2003' Intermediate 4427' 13-3/8" 20'-4447' 20'-4244' _ 3090/3450 1540/1950 Production 10315' 10-3/4"x 9-5/8" 19'- 10334' 19'-9231' Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft) 9980'- 10080' 8930'-9015' 7",26#5-1/2", 17#x 4-1/2", 13.5# N-80/L-80/A-95 9501' Packers and SSSV Type' 9-5/8"x 5-1/2" BOT Arctic Packer Packers and SSSV 9440'/8468' MD(ft)and TVD(ft): 12. Attachments' 13.Well Class after proposed work. 0 Description Summary of Proposal 0 BOP Sketch 0 Detailed Operations Program 0 Exploratory 0 Stratigraphic 0 Development 0 Service 14. Estimated Date for 15 Well Status after proposed work' Commencing Operation August 10,2015 • 0 Oil 0 WINJ 0 WDSPL 0 Plugged 16. Verbal Approval: Date 0 Gas ❑GINJ 0 GSTOR 0 Abandoned Commission Representative: 0 WAG 0 SPLUG 0 Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact' Sean McLaughlin,564-4387 Printed Name: David Bjork Title: Engineering Team Leader Email Sean.McLaughlin@bp com Signature: -�is Phone. 564-5683 Date es/40.A( Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Sundry Number k 6_2co__ ❑Plug Integrity i BOP Test 0 Mechanical Integrity Test 0 Location Clearance Other: 0G/' /c to 35aC/�5 ; (A-1 P5 P z.7-(7/.35;.) ,z)-nnv1ar /0 re-vav Fry /-r5t V-o z_,5"7)c..) psi Spacing Exception Required? ❑Yes dNo Subsequent Form Required. /O — 40 4 Approved By: APPROVED BY COMMISSIONER THE COMMISSION Date:S Z 7.-- Form 10-403 Revised 0/2012 r v}} p�itipn lid for 12 months from the date of approval Submit In Duplicate Uri_ 57'T/is Urc I 1 I V it RBDMAY 1 ✓r�y/ � s. i3. i� MS 1 8 10 5 bp Sundry Request Casing and Liner Repair Well: J-030 Date: 04/30/2015 Engineer: Sean McLaughlin MASP: 2270 psi Well Type: Producer Estimated Start date: August 10, 2015 History: J-03 was drilled in 1969 and completed in 1977. It was completed with multiple casing strings. A total of six GSO cement squeezes were performed since 1988. In 1997 gas lift was installed to the well after it required gas lift for kicking off the well. A tubing punch was added at-4,018' MD and a patch was installed with a gas lift mandrel. For the majority of its life from completion to 2000, it was a full-time producer with more than 95 percent on-time. The well began having issues in 2000 including annulus pressure build up, cellar bubbling, tree growth, and failing pressure tests. It became classified as inoperable as of December 2003 to present. The reason behind being inoperable includes a combination of factors already mentioned. However, the main reason is due to tree growth. While the well is on production thermal expansion occurs and the well tree grows while hydrocarbons also enter the cellar. The tree was replaced in October of 2009. In November of 2009, the well was put on production to determine if the well is economic to repair. On the 10th of November, after producing for three days the tree grew a foot and the flowline rose 9 inches. Crude was also found in the cellar during that time. A Furmanite clamp was installed on the well to fix the fluid influx, but it did not work. In 2012 and 2013 the well had passing pressure tests including an MIT-T, MIT-IA, and MIT-OA. A caliper from 2008 showed the tubing was in good to poor condition with a very poor spot at . -3,956' MD. Scope of Work: Pull 7" L-80 completion, Repair OOA x 000A communication. Retrieve packer, Run 4- 1/2" scab liner, Run 4-1/2" chrome completion. Pre Rig Prep Work: F CMIT-TxIA to 2,500 psi. MIT-OA to 1,200 psi S 1 Pull SSSV insert, Drift for RCT cutter. E 2 Use RCT to cut the 7" tubing -6' from top of first full joint above the tubing patch -3938'(leave a -35' stub). (Reference SLB Patch setting log 14-DEC-2001). F 3 Post cut test CMIT-TxIA to 2,500 psi. F 4 L&K well with seawater and Diesel F/P to 2500'. Bleed TBG to -200 psi W 5 Check the tubing hanger lock down screws for free movement. Completely back out and check each lock down screw for breakage (check one at a time). PPPOT-T& IC. V 6 Set BPV, ND Tree, NU Dry Hole Tree, PB I/A& upper 0/A valves F 7 Bleed WHP(s) to zero W 8 Excavate the cellar as needed to get top of spray-in liner below the 20" starting head. Line the cellar around the wellhead with impermeable, Rhino lined Herculite. Proposed RWO Procedure: • MIRU Doyon 16. Pull BPV. Circulate KWF. Set TWC. • ND tree. NU and test BOPE with four preventers configured top down (annular, 7"fixed, blind shears, mud cross and 3-1/2"x 6"VBR's). Test the VBR's to 3,500 psi and the annular to 3,500- psi. Pull TWC. • Pull 7" L-80 tubing from jet cut-3,980' MD. • RU E-line, Run cement log in the 10-3/4" x 9-5/8" casing to determine TOC in the annulus. • Set 9-5/8" RBP and 130' of sand -150' below logged TOC. PT RBP to 2,500 psi. • Swap wellbore to 9.8 ppg brine • Swap upper rams to 10-3/4"fixed. • Mechanically cut 10-3/4" casing in 1st full joint above the TOC. • Pull 10-3/4" casing to surface. • RU E-line, Run cement log in the 13-3/8" casing to determine TOC in the annulus. • Scrape 13-3/8" and dress-off 10-3/4" casing stub • ND BOPE and set back on stump. • Cut and pull 13-3/8" from just above TOC. • Pull 16" casing from wellbore • Run 9-5/8" tie-back and land in casing spool. Fully cement to surface with 590 bbls of 15.8 ppg class G cement • Install 9-5/8" sliplock wellhead. Swap upper rams to 7", Nipple up and test BOP equipment. • Drill out the 9-5/8" shoetract and test casing to 3,500 psi. • Recover the RBP. • Pressure test the wellbore to 3,500-psi for 30 charted minutes. • Fish the remainder of the 7" tubing. • Fish packer from 9,440'. • Drift and cleanout the 9-5/8" casing • Run and cement 4-1/2" scab liner from 10,130' to 9,530' with 60 bbls of 15.8 ppg class G cement. • Run 4-'/2" 12.6# 13Cr-85 VamTop tubing with HES TNT packer. • Freeze protect to 2,200' MD. • Set TWC. ND BOPE. NU and test tree. RDMO. Post rig Work ✓ 1 ND dry hole tree, NU upper tree. Pull TWC. ND PB IA&OA valves. F 2 Assist Slickline: Circ well S 3 Circ well with completion fluid and FP. Drop Ball n Rod. Set TNT packer, MIT-T, MIT- IA. Set generic gas lift design. Pull ball n rod, pull RHC-M. E 4 Run RPM log and perforate per PE • TREE= CNV S Y NOTES: FISH ON BTM.4-1/2"TAIL-PIPE VVELLHEAD= CNV CUT OFF @ 9501'. POSSIBLE TIGHT SPOTS IN ACTUATOR= BAKER J -O 3 AREA OF BOT PBR/SEAL ASSY(9401'-9435').TBG KB.ELEV= 57 BF.ELEV= 35.76' PUNCH HOLES(2)FOR POGLM ft 4018'(04/04/97). KOP= 2800' Max Angle= 38© 5000' Datum MD= 9894' Datum TVD= 8800'SS Q 1984' HT OTIS SSSVN W/ INSERT, ID=3.813" 16"CSG,65#,1+40H 2003' = II 2049' —113-3/8"DV COLLAR 20"CSG,94#/133#,H-40/K-55 H 2071' 1-4m -.... — 2272' H10-3/4"DV COLLAR 10-3/4"CSG,55.5#,N-80,D=9.760" H 2398' 1 / 2403' H10-3/4"X 9 5/8"XO Cut tubing at 3938' t �: ;. 4018' —12 TBG PUNCH HOLES FOR POGLM I GAS LIFT MANDRELS 7"TBG PATCH W/2-7/8"CA MCO — 4013' ST MD TVD DEV TYPE VLV LATCH PORT DATE �` �` 1 4015 3876 34 POGLM DMY BK 0 05/04/06 GLM,D=2.341" 13-3/8"CSG,61/68#,K-55,D=12.515" —1 4447' , 4981' H9-5/8"DV COLLAR 7"TBG,26#,N-80,.0383 bpf,D=6.276" H ??? 9401' —i TOP OF BOT PBR, ID=5.250" 9435' —I BTM OF 7"BOT SEAL ASSY,D=4.00" Minimum ID = 2.313" @ 9478' 9440' —19-5/8"x 5-1/2"BOT ARCTIC PKR,D=4.89" 4-1/2•• X 2-7/8" X NIP REDUCER 9448' 5-1/2"X 4-1/2"XO,D=3.920" 9478' —I4-1/2"OTIS X NP,w/2-7/8"NP REDUCER,D=2.313" 9478' -12-7/8"XX PLUG(11/24/09) 4-1/2"TTP, 13.5#,A-95,I-1Y DRL,D=3.920" —I 9501' 9501' —I END OF CUT OFF 4-1/2"TP 9482' H ELMD TT LOGGED 04/07/88 PERFORATION SUMMARY REF LOG:BHCS ON 01/01/70 ANGLE AT TOP PERF: 32 @ 9980' I Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE I 2-7/8" 4 9856-9896 S 11/20/88 2-7/8" 4 9920-9952 S 11/20/88 3-3/8" 4 9980-10080 08/21/97 — 3-3/8" 4 10080-10110 S 05/01/90 I 411111* 10150' —43'OF TBG TAN_w/PXN PLUG IN XN NP CUT OFF 04/12/77.* 3-3/8"DG RAN TO 10150' Akar 10220' 7"BRUSH(OR FECES) PBTD —1 10291' 1PUSHEDTOBTM (01/24/79) 9-5/8"CSG,47#,N-80, D=8.681" —I 10334' DATE REV BY CONVENTS DATE REV BY CONIVIBJTS PRUDHOE BAY UNIT 04/11/77 ORIGINAL COMPLETION 09/09/09 ???/TLH TREE GO(DRY HOLE)(08/10/09) WELL: J-03 10/23/01 CH/KAK CORRECTIONS 10/18/09 JR/PJC TREE GO PERMIT No:'1690450 05/07/06 TWS/PAG GLV GO(05/04/06) 11/06/09 BSE/SV PULL TTP(11/02/09) API No: 50-029-20025-00 05/29/06 CO/DTM TRII CORRECTIONS(6/13/04) 11/27/09 DMS/SV SET TTP(11/24/09) SEC 9,T11 N,R13E,860'SNL&1245'VVEL 08/15/06 PAA/PJC XX PLUG PULLED(05/04/06) 06/01/09 KDC/TLH XX PLUG SET(04/13/09) BP Exploration(Alaska) TREE= CNV WB LHEAD= CNV J O 3 S Y NOTES: ASH ON BTM.4-1/2"TAIL-PIPE ACTUATOR= BAKER CUT OFF @ 9501'. POSSIBLE TIGHT SPOTS IN KB BEV= 57 Proposed RWO AREA OF BOT PBR/SEAL ASSY(9401'-9435').TBG BF.ELEV= 35.76' PUNCH HOLES(2)FOR POGLM @ 4018'(04/04/97). KOP= 2800' Max Angle= 38 @ 5000' DetumMJ= sss4' • -- 4-1/2" OTIS X NIP, ID = 3.813" @ 2,200' Datum TVD= 8800'SS 9-5/8" 47# L-80 VamTopHC 9-5/8" HES ES Cementer eTOC -2049' 9-5/8" BKR Casing Patch 20"CSG,94#/133#,H-40/K-55 —I 2071• I 10-3/4" Bowen Casing Patch TOC -2272' 10-3/4" x 9-5/8" - 2,403' 13-3/8"CSG,61/68#,K-55,D=12.515" H 4447' 11_7 GML's TBD 1 1 4-1/2' OTIS X NIP, ID = 3.813" Z' 9400' -9-5/8"X4-1/2"HES'TNT, ID=3.88" 1 1 4-1/2" OTIS X NIP, ID = 3.813" 4-1/2"TBG,12s#,13Cr-85 VamTop — , 1�\ 4-1/2" OTIS XN NIP, ID = 3.725" 4-1/2" WLEG -th9530' - BOT 9-5/8" x 7" HGR & LTP ti$: .tires— 7" x 4-1/2" xover ▪r. 'r•r• PERFORATION SUMMARY .tir 741:4.ti.• .ti.5 RCF LOG:BHCS ON 01/01/70 •5.r• itir5 ANGLE AT TOP PERF: 32 @ 9980' .tir: r. Note:Refer to Production DB for historical pert data •tir▪ , 1":" SIZE SPF INTERVAL Opn/Sqz DATE .tif. •,'•;� 2-7/8" 4 9856-9896 S 11/20/88 .tir. :ti. 2-7/8" 4 9920-9952 S 11/20/88 "ti▪r' r}' 3-3/8" 4 9980-10080 08/21/97 .tir '~f 3-3/8" 4 10080-10110 S 05/01/90 •.....▪0. 71• .ti•r▪ . : .tie L'�rS� 10,130' - Cond B 4-1/2" 12.6#, Cr13 -▪frf.f :; .t▪irti tir•. 10150' —43'OF TBG TAIL w/FXN PLUG IN XN NP CUT ' OFF 04/12/77.* 3-3/8"DG RAN TO 10150' titi••. tij~r. 10220' —7"BRUSH(OR FECES) PBTD H 10291' , 1111111111 PUSHED TO BTM (01/24/79) 1111111111111111111 9-5/8"CSG,47#,NI-80,D=8.681" —I 10334' ,1.1.1.1.1.1.1.1.1.1 DATE REV BY COMMENTS DATE REV BY COIVInABVTS PRUDHOE BAY UNfr 04/11/77 ORIGINAL COMPLETION 09/09/09 ???/TLH TREE 0/0(DRY HOLE)(08/10/09) WELL: J-03 10/23/01 CH/KAK CORRECTIONS 10/18/09 JR/PJC TT.Q DO PERMIT No:'1690450 05/07/06 TWS/PAG GLV DO(05/04/06) 11/06/09 BSE/SV PULL TTP(11/02/09) API No: 50-029-20025-00 05/29/06 CO/DTM TRCCCORRECTIONS(6/13/04) 11/27/09 DMS/SV SET TTP(11/24/09) SEC9,T11N,R13E,860'SNL&1245'WEL 08/15/06 PAA/PJC XX PLUG PULLED(05/04/06) 06/01/09 KDDTLH XX PLUG SET(04/13/09) BP Exploration(Alaska) Is gN g ciiiim a .N ap IHHHF m L O1 !�! wUVii . o ¢ o ZO6 Z Eo R.Kb p o to • _ _ X c _O �z 3 / x h i Lai gw • L$1 a a5 awaa > JD, 0 3 6 a z = ONO . lo000000 I i 1 4, ird,re, ,1111.0- ! g g it ..,r mi jAV :II:::: ::3;01.8! -4....._.41 ,_(n _41:7=.=:011__ (8)._, T.-,,,, ~� ��_ - - a_ - - I.- 6 ; il. ;1 4: _y�J�■ ! c4 _�=� occ' ce _ z O N dii VI In a F O O o ri q L o -0 to c„ H �o•x0 c. ' = 5 aD SJx 5yR xm a s a a m go qR x QE' m i`pe o I'n c- $ 1 5 1 15 m X w X g m n U'ii © : i 0 _1 W I cc 10 QZ OO n 30, . -u_ / 4 ji .A, - o RI... R� S i•Him! J n QIIU I III II o1111111111111,11 Q oce \� m *9=11 a) Vo 0 = 4� a c co m 'I■ F n U _ s- fl I— ro n n STATE OF ALASKA ALASKi~OIL AND GAS CONSERVATION COMMISSI~' REPORT O-_ SUNDRY.WELL OPE¥.ATIONS 1. Operations performed: Operation shutdown Stimulate Plugging__ Pull tubing~ Alter casing __ Repair well Perforate x Other × 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchora.cle, Alaska 99519-6612 4. Location of well at surface 860' SNL, 1245'WEL, SEC. 09, T11N, R13E, UPM At top of productive interval 1865' NSL, 1684' EWL, SEC. 04, T11N, R13E, UPM At effective depth 1904'NSL, 1674' EWL, SEC. 04, T11N, R13E, UPM At total depth 2040' NSL, 1635' EWL, SEC. 04, T11N, R13E, UPM 5. Type of Well: Development Exploratonj Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 57.26 AMSL 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number J-03 (23-04-11-13) PBU 9. Permit number/approval number 69-45 / 10. APl number 50.029-20025 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10336 feet BKB 9232 feet 10068 feet BKB 9005 feet Plugs (measured) Junk (measured) fill at 10068' MD (01/90) Casing Length Size Cemented Measured depth True vertical depth Structural .. BKB Conductor 107 30 150 sx 128 128 Surface 2050 20 4000 sx 2071 2071 Intermediate 4426 13 3/8 2710 sx 4447 4233 Production .- Liner 7936 10 3/4 x 9 1680 sx 2398-10034 2398-9232 Perforation depth: measured 10010'- 10030'; 10030'- 10036'; 10036'- 10056', 10075'- 10080' RclTd: .qRfiR' - 9R.qB'. .qgP2' - 9.q.~,~'. 10~3R0'- l OC).qo': 1Qo.qo' . 10110' true vertica§ubsea 8899'-8916'; 8916'-8921'; 8921'- 8938'; 8954'- 8959' Sclzd: 8767'-8802'; 8824'-8850'; 8958'-8967'; 8967'-8984' Tubing (size, grade, and measured depth) 7" N-80 surface-9401'; 5 1/2" L-80 9401'-9430' with 4 1/2" tailpipe to 9480' Packers and SSSV (type and measured depth) 9 5/8" HIRSP packer at 9430'; 4 1/2" SSSV & insert at 1984' 13. Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1173 33486 0 0 1747 Subsequent to operation 1620 910 241 0 198 15. Attachments I 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations I Oil× Gas Suspended 17. I hereby certify that the/~eregoing is true/~'nd correct t° the best of my knowledge. Sign TitleTechnical Assistant III Form 10-404 Rev 06/15/8~ Service Date/,//,~/~/~ SUBMIT IN DUPLICATE J-03 DESCRIPTION OF WORK COMPLETED REPERF 02/19/97 SUMMARY The following interval were reperforated using 3 1/2" guns, 4 SPF, random orientation and 60/120° phasing. 10050' - 10070'MD 10070' - 10080'MD REPERF 06/17/97 SUMMARY The following interval were reperforated using 3 3/8" guns, 4 SPF, random orientation and 60° phasing. 10010'-10030' MD ADDPERF 08/21/97 SUMMARY The following additional interval were perforated using 3 3/8" guns, 4 SPF, random orientation and 90° phasing. 9980'-10010' MD TUBING PATCH 09/12/97 SUMMARY Kill well with 640 bbls seawater. RIH with patch. Tie in and set top of patch @ 4,009'. POH and Rig Down. AVA Model DWP Retrievable Patch with Gas Lift Mandrel: Length = 23' 4", Min ID = 2.875", Length between seals = 10' 4" GLM Pocket = 1.5", "RK" LatchTop of assembly @ 4,009', bottom @ 4,032'. Fluids Pumped BBLS. Description 763 Sea Water 20 Diesel 783 Total LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ~NCHORAGE AK,~.99501. Date: 7 May 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 GR/CCL FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF ECC No. Run ~ I 1130.07 Run # 1 2189.05 Run # 1 4060.08 Run # 1 4078.04 Run # 1 4912.05 Run # 1 5630.03 Run # 1 5633.05 Run # 1 Run # 1 6299.05 plea. se~Sign and return to: Attn. Rodney D. Pauiscn Western Atlas Lccclnc Services 5600 B Street Suite 201 Anchorage, AK 99518 Received by: , /~ D~te: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Dear Sir/Madam, Reference: J-03 (4-11-13) PRUDHOE BAY NORTH SLOPE, AK Date: RE: 26 February 1996 Transmittal of Data ECC #: 6299.04 Sent by: HAND CARRY Data: LDWG Enclosed, please find the data as described below: Tapes/Diskettes: I LDWG TAPE+LIS Run # i Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 i~-..~.  907) 563-7803 ':~ "~ Received by: Date: ,~ LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 16 February 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL G-14 (12-12-11-13) DESCRIPTION 1 PLS FINAL BL+RF i PDK FINAL BL+RF i TEMP LOG FINAL BL+RF i PL$ FINAL BL+RF 1 PFC/PERF FINAL BL+RF i PLS'FINAL BL+RF I PFC/PERF FINAL BL+RF i CN FINAL BL+RF 1 GR/CCL FINAL BL+RF I GR/CCL FINAL BL+RF ECC No. Run # i 604.06 Run # I 3561.04 Run # 1 Run # 1 3986.05 Run # 1 5062.01 Run # 1 5653.07 Run # 1 6054~ 06' Run # i 6299.04 Run # i ......... 6454.01 .............. .............. ~ Run # 1 6592.00 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street .................................. /~chorage, ~ 99518 Or F~ ~,(907) 563-7803 ........................................................... Received by: Date: Oil & 6~s Co~. Com,mi,~on Anchom,3e LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 21 November 1994 Transmittal of Data Sent by: MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 .PLS FINAL BL + RF 1 PLS FINAL BL + RF 1 PFC/PERF FINAL BL+RF 1PLS FINAL BL + RF 1 PLS FINAL BL + RF 1DIFL/GR FINAL BL+RF 1 BHC/GR FINAL BL+RF 1 CN/GR FINAL BL+RF 1 SSTVD FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run #. 1 Run # 1 Run # '1 ECC No. 1187.03. 1341.01 6010.06 6063.01 6299.03 6301.00 Please sign and return to: Wireline Ser~ 56~O~x_~treet / ~ Suite 2D% / At/~ RodneyD. _l~:n_~s~?~__ ~~ ~r~to <907) 563-7803 Received by: , ////~ ' ~ · BP EXPLORATION TOTAL: WELL~ NOT IN AOGICC COMPLIANCE;exel. Susp,/H20 Inl,/Waivera} (s~tad by date) GL WELL~ NOW SHOW TIlE ~AME H.I.P. A~ THE INd HEADER WELLSTATUS iNOUll nn.~l SiP % SIZE/TY E PPMl~V~R~e ... COMMENT¢~ FL OUT ~ 6" CIW Rig and rig'camp proximity J-03 . . ~1,'~1,~'''''' ZT~i0 1!. 41/ZRQ Oll~ ....H 1 13 lent set ss~v 9-28-94 FI. OUT ~ ,-.lu/h~l acid treatment up coming W-04 7/4~4 1500 36 $1/2 X OTIS L 7 1 1 tent set s~sv 9-20-94 ' FL ouT 4" CIW =tu/packer stimulation u; ~mlng W-15 GL 7~i,'94 51 4 1/2 X OTIS L 6 9 tent set sssv 9-20.94 FL OUT 3,. CIW Fl°W' back from acic~ jnh in progress z-05 T 7113/94 0 ~ 1/2X AXELSON L 7 ~2 tentset~svg-15-94 FL OUT K-VALVE ..~ waiting nn parts for k-val'~e R-12 ~ 7/24/94 1990 78 23/8..~C OTIS L 29 400 tent aet~vg-18-94 FL OUT 4' .C;.IV~" up coming c, tu/perf job -- Z*07a GL 7/~4/N, 21 ,4 1/'~ X ,OTIS L 6 20 tent set sssv 9-20.94 F~ OUT .. 4' CIW )ad dow~ for g~-a WOrk well unlaoding J-28 8/2/g4 ,, 2200 6,4 5 1/2 C AxELSON. H 5 a Ient set sssv 9-20-94 FI ~! IT 4" CNV up oomin9 ~a6 perf~ _R_'J 7 GL 8/g~a4 1990 68 41/2 X AXEL$O,N L 18 36 Ienl se,t sssv 9-20.94 FL OUT ~_..3. FMO Ul~ ~umil~ logging an~ gl wo~ -- 8/5/94 1760 67 31/2X BAKER g 8 8 5-112"P., & 4-1/2" - ~ FLAPPERS ALL OTI IER~ · OTI,9 Ball Vulvu,, (i.~ B & G Lines are ir~ Gornmun~callo~) X - AOGGC Waiver te have SSSV out (long-term Si well1 · · ~ CONTROL LINE MANIF. Oi.D INOTALLED OCt. - CONTINUOUS CONTROL LINES EI:~ - EMEROENOY C,A$1NI~I SLIPS P-PILOT: D- Dual H-High Press L- Low Press REVISED: 9/4f94 (*H25; 5/9/94 ) DB- DRILLBY FAC- FACILITY GL - GAS UFT GOR - HIGH GA~IL RATIO MEG - MECHANICAL FAILURF_ PE - PROD ENGINEER PI. LOW PI RCKS-~ ~,QZ- SQUEEZE WO - WATF. R CUT *° CHECK H,?.$ BEFORE WORKING ON WELl_ ANY WELLS ABOVE 20 PPM REQUIRE A SNIFF PRIOR TO COMMENCING OPERATIONS. 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing Alter casing Repair well 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 STATE OF ALASKA S,~ A ':' , OIL AND GAS CONSERVATION COMMI REPORT OF SUNDRY WELL OPERATIONS Perforate "~ I Other' X 5. Type of Well: ~ 6. Datum elevation (DF or KB)' ~"~'_.. Development × I KBE=57.26 AMSL-~t.,,I Exploratory Stratigraphic 7. Unit or Property name ~'~ ' Serv~ Prudhoe Bay Unit 4. Location of well at surface 860' SNL, 1245' WEL, SEC. 09, T11N, R13E, UPM At top of productive interval 1865' NSL, 1684' EWL, SEC. 04, T11N, R13E, UPM At effective depth 1904°NSL, 1674' EWL, SEC. 04, T11N, R13E, UPM At total depth 2040' NSL, 1635' EWL, SEC. 04, T11N, R13E, UPM 12. Present well condition summary Total depth: REC£1V£D .Alaska Oil & Gas Cons. Anchorage measured 10336feet true vertical BKB 9232feet Plugs (measured) 8. Well number J-03 (23-04-11-13) PBU 9. Permit number/approval number 69-45/90-227 10. APl number 50- 029-20025 11. Field/Pool Prudhoe Oil Pool Effective depth: measured 10068feet true vertical BKB 9005feet Junk (measured) fill at 10068'MD (01/90) Casing Length Size Structural -- Conductor 107 30 Surface 2050 20 Intermediate 4426 13 3/8 Production -- Liner 7936 10 3/4x 9 5/8 Perforation depth: measured 10036'-10056', 10075'-10090' Cemented Measured depth 150 sx 128 4000 sx 2071 2710 sx 444 7 1680 sx True vertical depth BKB 128 2071 4233 2398-10034 2398-9232 Sqzd: 9856'- 9896', 9922'- 9952; 9981'- 10022', 10090'- 10110' true vertical subsea 8921' - 8967' (two intervals) Tubing (size, grade, and measured depth) 7" N-80 surface,9401'; 5 1/2" L-80 9401'-9430' with 4 1/2" tailpipe to 9480' Packers and SSSV (type and measured depth) 9 5/8" HIRSP packer at 9430'; 4 1/2" SSS V& insert at 1984' 13. Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 1173 33486 0 0 1747 1620 910 241 0 198 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended 17. I hereby c, ertify that the foreoj;~g is true and correct to the best of my knowledge. Signed"/~bv~ .~ ^"~" ,---- v ~--~ Title Senior Technical Assistant I Form 10-4-04'Rev 06/15/88 Service Date SUBMIT IN DU~LI/OATE 4115190 WELL J-03(23-04-11-13) N0n-RigWorkOver Approval#90-227 A NRWO/ACID was performed using the following fluids: 147 bbls PW W/FR circ (to load well) 29 bbls Gel to Clean Sump 167 bbls PW w/fr circ (cool sump) 5 bbls EW(Pre-flush) 35 bbls ACID 10 bbls EW (Spacer) 62 bbls PW(Displace Acid) 10 bbls Eft WTR (Pre-flush) 24 bbls Cement 26 bbls Eft WTR (Spacer) 35 bbls Gel Contaminant 31 bbls PW Flush Class G Cement: 15.8 PPG Containing, .88% FL-20 + .1% CD- 31 + .08% R-11 + 1 GHS FP-6L ACID: 12%HCL Containing, 10% Xylene,.4%CI-25 + .4% NE- 41 + .7% S-500 + 25 PPT Ferrotrol 210 5/01/90 fjh 2/10/93 The following interval were re-perfed using 3 3/8" guns, 45° orientation and 90° phasing. 10060' - 10080' MD BKB 4 SPF RECEIVED MAR Alaska 0il & Gas Cons. A~chorag~ BP EXPLORATION BP Exolora~.ion (AlasKa) inc. 900 East 8enson Bou~evarc~ P.O. Box 196612 Anchorage. Alaska 995!9-66!2 (907) 561.51~1 DATE: 10/07/91 T9 82899 BP PRESSURE REPORTS Enclosed is Your 'Copy of'the'mater£a~s' listed bel~'W"' If you have any questions, please con~act BP Well Records at (907) 564-4004. PRES PRES PREs C-35'--~ PRES C-02~ PRES F-17 ~ PRES F-42.~' PRES J-03 ~-'" PRES G-24~' PRES ,A-i6 ~ PRES F-44 ~ _']?.PREs F-45 ~' PRES P-03 ~ PRES M-16~- PRES F-03 ~-~ PRES R-04 '~' PRES G-11~ PRES W-11~ PRES Z-28 ~- PRE'S F-38~' PRES G-26 ~ PRES G-32 ~ PRES G-05 -' PRES B-32 ~ PRES F-24 - PRES 07/31/91 REF% 07/31/91 REF~ 05/25/91 REF% 08/04/91 REF~ 07/31/91 REF% 08/13/91 REF% 09/04/91 REF9 09/04/91 REF% 09/03/91 REF% 09/01/91 REF~ 09/04/91 "~7~i~.E9 09/02/91 REF# 09/10/91 REF~ 08/26/91 REF~ 08/30/91 REF9 08/26/91 REF~ 08/31/91 REF~ 08/21/91 REF% 08,/22/9.i .... 'REF~ 09/06/91 REF~ 09/04/91 REF~ 09/04/91 REF~ 09/03/91 REF~ 09/15/91 REF~ 09/03/9'1 REF~ STATIC SURVEY STATIC SURVEY STATIC SURVEY STATIC SURVEY STATIC SURVEY GRADIENT BHP STATIC BHP STATIC BHP STATIC BHP FLOW · s ~ic . :_ ,,~:~. BHP STATIC BHP STATIC BHP FLOW BHP STATIC BHP FLOW BHP STATIC BHP STATIC .BHP',STATIC~ BHP STATIC BHP STATIC BHP STATIC BHP STATIC BHP STATIC BHP STATIC HLS HLS HLS HLS HLS HLS CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO ..... CAMCO CAMCO C~MCO CAMCO CAMCO CAMCO C~/~.C© !nforma5ion ConSroi Well Records Adrian J. Martin BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO, Box 196612 Anchorage, Alaska 99519-6612 (907) 56t-5111 TO: DISTRIBUTION · Date:04/16/91 T#:82314 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-07., G-14'" M-25 U-06 - qO'"~ ~ .-Z-11/- Leak Det 03/31/91 #1 9800-10100 Camco 5" Pord-F 03/26/91 #1 9290-9600 Camco 5" PITS 03/27/91 #1 11700-12225 Camco 5" Prod-F 04/01/91 #1 9750-10070 Camco 5" Leak Det 03/31/91 #1 Camco 5" Leak Der 03/31/91 #1 10100-10500 Camco 5" Pmd/Temp 04/06/91 #1 8805-9205 Sch 5" Prod-F 03/26/91 #1 9650-9924 Cd'rnco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :05/07/90 T#:81103 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. E-09 GR 05/01/90 #1 10730-10900 'Atlas 5" J-03 PFC 05/01/90 #.1 9400-10072 Atals 5" W-25 CCL 04/30/90 #1 10100-10541 Atlas 5" G-13 CCL 05/05/90 #1 9100-9387 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS R ES E~R VC;)i R ~-"--'-~ _--~TATE"OF ALASKA~ Alaska 011 & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 April 11, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Weli J-3 (23-04-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform remedial/capacity sustainment work on the well. Yo~r~.r~~ R. B. Frazier Supervisor Gravity Drainage RBF:JAM Enclosures (9) cc: L. Burke (MB12-1) Well File RECEIVED iAPR 12 ~ ~es~ ~jJ .& Gas Cons..Commis$ior~ *'~:~ gilchorage ( ~ STATE OF ALASKA [ n ~ ASKA OIL AND GAS CONSERVATION COMMISSION U lit APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Alter casing __ Repair well 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 860' SNI., 1245' WEI., SEC,. 09, T11N, R13E, UPM At top of productive Interval 1865' NSL, 1684' EWL, SEC,. 04, TI1N, R13E, UPM At effective depth 1904'N$1., 1674' EWL, SEC,. 04, T11N, R13E, UPM At total depth 2040'NSL, 1635' EWL, SEC,. 04, T11N, R13E, UPM 12. Present well condition summary Total depth: measured 10336 feet true vertical BKB 9232 feet Operation Shutdown Plugging Pull tubing __ Variance 5. Type of Well: Explorat~lf Stratigraphio Service Re-enter suspended well Time extension Stimulate Perforate Other x 6. Datum elevation (DF or KB) KBE , 57.26 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number J-03 (23-04-11-13) PBU 9. Permit number 10. APl number 50- 029-20025 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Effective depth: measured 10068 feet true vertical BKB 9005 feet Junk (measured) fill at 10068'MD (01/90) Casing Length Size Structural .- Conductor 107 30 Surface 2050 20 Intermediate 4426 13 3/8 Production -. Liner 7936 103/4 Perforation depth: measured 10036'.10056', 10075'-10090' Cemented 150 sx 4000 sx 2710 sx 1680 sx true vertical subsea 8921'- 8967' (two intervals) Measured depth True vertical depth BKB 128 128 2071 2071 4447 4233 2398-10034 2398-9232 Sqzd: 9856'. 9896', 9922'- 9952', 9981'. 10022', 10090'. 10110' Tubing (size, grade, and measured depth) 7" N-80 surface.9401 '; 5 1/2" L-80 9401'-9430' with 4 1/2" taiipipe to 9480' Packers and SSSV (type and measured depth) 9 ~/8" HIRSP packer at 9430'; 4 1/2" SSSV & insert at 1984' 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14.AprilEstimated1990 date for commencing operation I15. Status of well classification as: R E ¢ E I V 16. If proposal was verbally approved Oil X Gas Suspended Name of al~rover . ,,'~ Date approvedI Service 'APR 19!0 17. I hereby c~ify that th oi s true and correct to the best of my knowledge. ~' q~J.._J~__ .UIJ .~ tAas CUiI~o Signed Title Supervisor Grav~ Dralnac, le Date FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- ,g.c,z/ Approved by order of the Commission Form 10-403 Rev 06/15/88 ORIGINAL SIGNED BY Lu~i-,iiE C. Approval No. c:3 _ I ,..,,,.,v ;,,'(;:)...~,a. :-7 ~)~.u- , /'//3 Commissioner Date '~-~, -- ~' ~ SUBMIT IN TRIPLICATE WELL .1-03 (~3-04-11-13~ PBU CTU CEMENT SOUEEZE PROPOSAl. A coiled tubing cement squeeze of existing perforations is proposed as follows: 1. Perform pre-workover surveillance. Cleanout well w/CTU to establish a deeper 2. Rig up CTU and support equipment and pressure test BOP's to 4000 psi. 3. Perform perforation acid wash. 4. Pump cement and squeeze existing perforations. 5. Reverse out cement after squeeze is obtained. Wait overnight, then test squeeze by performing inflow test. If squeeze fails, immediately rcsqucczc. 6. If squeeze is successful, perforate thc following interval: Add pcrf 10060' - 10075' MD BKB Reperf 10075' - 10080' MD BKB All depths are referenced to BHCS 1/1/'/0. ?. Return well to production and test. $. If well will not flow, a nitrogen lift and/or perforation acid wash will be performed. If well still will not flow, contingent perforations will be shot as follows: Rcperf: 10050' - 10060' MD BKB Return well to production and test. jam 4/11/90 RECEIVED 'APR 1219 0 .Oii.A Gas Cons° Commissiol~ ~ ~ ~chol'aga Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Off Blind Rams Cutter Rams 2" Chicksan (Kill Line) Slips Pipe Rarest. Pump-In Sub (C irc ula t e/R e turn s ) W ell Head Swab Valve Anchora~ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 02/12/90 Transmittal: 80902 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. C-04 Casing Cutter 02/03/90 C-15 TCP Gun/Packer 02Y06/90 C-15 PERF 02/04/90 J-03 LEAK DET. 01/30/90 M-07 PROD-F 02/07/90 M-14i PERF 02/05/90 W-19 CBT 02/02/90 W-19 CET 02/02/90 W-19 PERF 02/02/90 W-23 PROD-F 02/03/90 ~1 8790-9514 Sch #1 9152-9702 Sch 5" ~1 9152-97~ Sch ~1 9690-10066 Sch 5" #2 8150-9880 Sch 5" #1 10300-10733 Sch 5" #1 10500-11426 Sch 5" #1 _10500-11445 Sch 5" ~1 10680-11424 Sch 5" #1 9700-9958 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR ARCHIVES RECEIVED r, Ai-~s!m ()il & ~s Cons. Anchorage BP EXPLORATION ORIGINAl.. BP Exploration (Alaska) Inc. 900 East Benson Boulevard Re. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 28, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well J-3 (23-04-11-13) PBU Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of performing a cement squeeze and reperforation of the well. Yours very truly, Manager Production Engineering JAM: JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 Well File RECEIVED Alaska Oii& Gas Cons. Commission Anchorage ~ STATE OF ALASKA 'k~.. _ASKA OIL AND GAS CONSERVATION CO .,.,SION REPORT OF SUNDRY WELL OPERATIONS Stimulate Plugging Repair well 5. Type of Well: Explorato~/ Stratlgraphi¢ ' Service 1. Operations performed: Operation shutdown __ Pull tubing Alter casing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 860' SNL, 1245' WEL, SEC. 09, T11N, R13E, UPM At top of productive interval 1865' NSL, 1684' EWL, SEC,. 04, T11N, R13E, UPM At effective depth 1988' NSL, 1648' EWL, SEC. 04, T11N, R13E, UPM At total depth 2040'NSL, 1635°EWL, SEC. 04, T11N, R13E, UPM 12. Present well condition summary Total depth: measured 10336feet true vertical BKB 9232feet Plugs (measured) Perforate Other X 6. Datum elevation (DF or KB) KBE = 57.26 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number J-03 (23-04-11-13) PBU 9. Permit number/approval number 69.45 / 8-849 10. APl number 50- 029-20025 11. Field/Pool Prudhoe Oil Pool Effective depth: measured 10098feet true vertical BKB 9022feet Junk (measured) fill at 10098'MD (05/89) Casing Length Size · Structural ........ -- Conductor 107 30 Surface 2050 20 Intermediate 4426 13 3/8 Production -- Liner 7936 10 3/4 x 9 5/8 Perforation depth: measured 10036'-10056', 10075'-10090' Cemented Measured depth 150 sx 128 4000 sx 2071 2710 sx 4447 1680 sx True vertical depth BKB 128 2071 4233 2398-10034 2398-9232 Sqzd: 9856'- 9898', 9922'- 9952', 9981'- 10022', 10090'. 10110' true vertical subsea 8921'- 8987' (two intervals) Tubing (size, grade, and measured depth) 7" N-80 sudace-9401 '; 5 1/2" L-80 9401'-9430' with 4 1/2" tailpipe to 9480' Packers and SSSV (type and measured depth) 9 5/8" HIRSP packer at 9430'; 4 1/2" SSSV & insert at 1984' 13. Stimulation or cement squeeze summary see attachment 14. Intervals treated (measured) Treatment description including volumes used and final pressure R9.oresentative Daily AVerage Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure RECEIVED AUG 3 o 1989 A/aska 0il & Gas Cons. Cnrn~L~_~!.,:., Anchorage · Tubing Pressure Prior to well operation 2140 28473 356 0 2403 Subsequent to operation 2390 1305 158 0 275 15. Attachments ~ 16. Status of well classification as: Copies of Logs and Surveys run I Daily Report of Well Operations X Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~'/'/~/J/~ ,~'/~~ Title Manager Production Engineering Date Form 1~,~04 Rev 06/15/88 ~/'// SUBMIT IN DUPLICATI~ WELL .I.3 (23-04-11-13~ PBU CTU CEMENT SOUEEZE OPERATIONS A coiled tubing cement squeeze of existing perforations was performed as follows: 11/20/88 Rigged up CTU and support equipment and pressure tested BOP's to 4000 psi. Performed perforation mud acid wash, then performed cement squeeze on existing perforations. Contaminated cement then reversed out. Pressure tested squeeze, okay. 12/8/88 Rigged up Dresser Atlas and reperforated the following intervals using 3 3/8" carrier gUns at 4 spf: 10036'- 10056' MD BKB 10075' - 10090' MD BKB Attempted to return well to production, would not flow. 12/10/8 8 Performed nitrogen lift; returned well to production and tested. '3/5/89 .... Performed'spinner survey which indicated that squeeze had broke down. 5/6-7/89 Rigged up CTU and support equipment and pressure tested BOP's to 4000 psi. Performed perforation mud acid wash, then performed cement resquecze on existing perforations. Contaminated cement then reversed out. 5/8/89 Performed inflow test, okay. 5/11/89 Reperforatcd thc following intervals using Dresser Atlas 3 3/8" carrier guns at 4 spf: 10036' - 10056' MD BKB 10075' - 10090' MD BKB Attempted to return well to production; would not flow. 5/17/89 Performed jet pump lift, perforation acid wash and nitrogen lift; returned well to production and tested. jam 8/23/89 C IV '£ D 'AUG 3 o 11989 Alaska Oil & Gas Cons. Commission AnchoraGe BP EXPLORATION BP Exl31oration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO HOUSTON ARCO CHEVRON EXXON MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES BP CASED HOLE FINAL LOGS Date: 05/17/89 T%: 8006~ The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: A-34A DTL 05/04/89 %1 0-8600 Camco C-28 Collar 05/12/89 %1 10700-11050 Camco 5' C-29 Prod-F 05/05/89 %1 11650-11958 Camco 5" F-35 PFC 05/11/89 %1 11550-11955 Atlas J-03 Collar 05/11/89 %1 9350-10076 Atlas M-29I Perf-F 05/10/89 %1 9550-10194 Sch Received: Date: Information Control Well Records LR2-1 J. Dietz/S. McCurry BP EXPLORATION EOUSTON ARCO CHEVRON EXXON TEXACO TO: MOBIL REFERENCE: PHILLIPS ST.~ OF ALASEA GEOSCIENCES EESEKVOIt ARCHIVES ~ . 'BP°CASED HoLE FINAL LOGS BP Exl31oratlon (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (gOT} 561-5111 DaCe: 05-08-89 T~: 80039 The following material Is being subml'f-l'ed herewith. Please acknowledge receipt by signing a copy of this let'l'er and returning it to this office: ' F-32 PERF 04-29-89 #1 10200-10788 Sch 5" J-03 SQZ PERF 05-01-89 #1 .9753-10040 Sch 5" C-22 TRACER 04-30-89 #1 9500-10083 Sch 5'~ B-01 PERF 04-27-89 #2 9250-9706 Sch 5" K-12 PEP~F 04-28-89 #2 8650-9353 Sch 5" F-07 PUlqCHER 04-28-89 #1 .9130-11240 Sch -, 5" -. Race i red Date 1 Nas~ Oil & Gas Cons. commission .. · . Shirley R. McCurry INFORMATION CONTROL Well Records LR2-1 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To HOUSTON ARCO CHEVRON EXXON TEXACO MOBIL EOSC---CTn C RESERVOIR , , ARCHIVES Date: 03/21/89 T%: 79898 BP CASED HOLE FINAL LOGS The following material is being submitted herewith; Please acknowledge receipt by signing a copy of this letter and returning it to this office: A-Ii Inj , 03/06/89 91 9800-10100 Camco J-03 Prod 03/05/89 ~1 9700-10126 Camco 5" W-31 GR/CCL 03/04/89 91 10800-11933 Camco 5" W-31 Caliper 03/06/89 ~1 10800-11100 Camco 5" Received: Date: Alast~a ~,, & Gxs Cch?,. Commission Anchorago Information Control Well RecordsLr2-1 J. Dietz/S. McCurry HOUSTON ARCO CHEVRON EXXON TEXACO tO: MOBIL REFERENCE: PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES SAPC CASED HOLE FINAL LOGS I NOEXED STANDARD ALASKA PRODUCTION Date: 12-28-88 TI: 79664 The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and. returning It to this office: , A-25 TEMP 11-26-88 #1 2200-11650 Go 2" J-03 CL 12-08-88 #1 9300-10110 Atlas 5" X-I9 PROD-F 12-10-88 #1 8650-9170 Atlas 5" W-25 SPIN/TEMP 12-23-88 #1 10000-10595 Sch 5" C-12 PERF-F 12-22-88 #1 11550-11875 .Sch 5" Z-28 SPIN/TEMP. 12-22-88 #1 9800-10202 Sch 5" G-02 TUBING CTR 12-24-88 #1 8650-8950 Sch 5" C-10 PROD-F 12-24-88 #2 11500-11932 Sch 5" Received Date Alaska 0ii & ~.~s Cons. CcmmissJc~ Anchorage Shirley R. McCurry INFORHATION CONTROL Well Records LR2-1 A und O| Iht,' o.9;nol 51u,~.do.d (~l Co,nl:~lny Founded ,n Cle,.elond. C~,o. ,n 1870 Standard Alaska ~ Production Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 5'rANDARD ALASKA PRODUCTION November 10, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well J-3 (23-04-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform a cement squeeze and reperforation of the well. JAB:JAM Enclosures (g) cc: L. Burke (MB12-1) J-3 Well File Yours very truly, J. A. Bragg Manager Production Engineering A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well~ Alter casing ~ Repair well ~ Plugging ~ Time extension ~ Stimulate __ Change approved program ~ Pull tubing ~ Variance ~ Perforate ~ Other X 2. Name of Operator Standard Alaska Produ~'on Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 860' SNL, 1245' WEL, SEC. 09, T11N, R13E, UPM At top of productive interval 1865' NSL, 1684' EWL, SEC. 04, T11N, R13E, UPM At effective depth 1992' NSL, 1647' EWL, SEC. 04, T11N, R13E, UPM At total depth 2040' NSL, 1635' EWL, SEC. 04, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical BKB Effective depth: measured true vertical BKB 5. Type of Well: Development x Exploratory Stratigraphic Service 10336 feet Plugs (measured) 9232 feet 10105 feet Junk (measured) 9028 feet Casing Length Size Cemented Structural -- 6. Datum elevation (DF or KB) KBE = 57.26 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number J-03 (23.04-11-13) PBU 9. Permit number 69-45 10. APl number 50- 029-20025 11. Field/Pool Prudhoe Oil Pool Measured depth True ve~tt~i~l'$~ ' BKB Conductor 107 30 150 sx 128 128 Surface 2050 20 4000 sx Intermediate 4426 13 3/8 2710 sx 2071 2071 4447 4233 Production -- Liner 7936 10 3/4 1680 sx 2398-10034 2398-9232 Perforation depth: measured 9856'-9896', 9922'-9952', 9982'-10022', 10036'-10056', 10075'-10110' true vertical subsea 8767'-8984' (five intervals) Tubing (size, grade, and measured depth) 7" N-80 surface-9401'; 5 1/2" L-80 9401'-9430' with 4 1/2" tailpipe to 9480' Packers and SSSV (type and measUred depth) 9 5/8" HIRSP packer at 9430? 4 1/2" SSSV & insert at 1984' 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X 14. Estimated date for commencing operation NOVEMBER 1988 16. If proposal was verbally approved Oil X Gas Name of approver ~ Date approved Service 17. I hereby ~h~.".~. s~,,,._ue and correct~;/the best of my knowledge..~ Signed /,~/~-//~.~c~'~v~ .~q,. Title Manager Production Engineering! /FO. COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance ~ Mechanical Integrity Test~ 15. Status of well classification as: Suspended Approved by order of the Commission Form 10-403 Rev 06/15/88 I ^""r°va'"°' ' I SUBMIT I~ T~LICATE J-03 NRWO PROCEDURE 1) 2) 3) 4) 5) 6) 7) 8) 9) Install/Perform IUD. RU CTU and pressure test to 4000 psi. Reverse out sump fluids to about 10130. Perform perforation cleanup mud acid wash. Kill well for NRWO. Pump Cement with surfactant/mutual solvent preflush. Perform cement squeeze. Contaminate cement in the wellbore Reverse out contaminated cement and replace with clean PW. 10) Leave well Shut-in for 14 days. 11) Reperforate as follows: 10036-10056 ; 10075-10090. 12) POP and test. Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack--Of~ (~~2" Ch[cksan (Kill Line ) Slips Pipe Rams · Pump-In Sub (Circulate/Returns) Well Head Swab Valve DALI.AS ARCO CHEVRON E,'CXON TEXACO Date: TO: HOBIL TI: PHILLIPS STATE OF ALASKA GEOSCIENCES STANDARD AL ASF~ PRODUCTION 04/14/88 78729 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing ~ copy of this letter and returning It to this,office: C-30 D-22 H-3A N-2 ~-39 W-39 ~-39 X-24 X-24 Completion Record 04/06/88 #1 9197-9669 Sch 5" Production Profile 04/04/88 #1 9050-9390 Camco 5" CBT 04/10/88 #1 2243-8804 Sch 5" GR/Collar 04/07/88 #1 9300-10130 Camco 5" Completion Record 04/08/88 #1 9290-10080 Sch 5" CET 04/09/88 #1 9643-10912 Sch 5" Production 04/05/88 #1 10180-10400 Sch 5" CBT 04/09/88 #1 8990-9846 Sch 5" CET 04/09/88 #1 8990-9846 Sch 5" Perf. Record 04/10/88 #1 8900-9850 Sch 5" Injection Profile 04/07/88 #1 9100-9625 Camco 5" Injection Profile 04/09/88 #1 9100-9470 Camco 5" .CE Alaska 0il & Gas Cons. C0mmisol0n ' Anchorage , Rece i ved Date A un.I 01 ~'he o,,9,~,.I 5,('~ndo,d 0,1 Compony Fou,'ded ,n Cle.~'l¢,~d. C~,o. ,,, I1~10 Victoria Aldridge I NFORHAT I ON CONTROL Wel I Records LR2-1 Standard Alaska Production Company (': 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-.5111 STANDARD ALASKA PRODUCTION April 18, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well J-3 (23-04-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of perforating the well. Yours very truly, JTB:JAM~ Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 J-3 Well File J~T. Brown, Supervisor Gravity Drainage RECEIVED APR 2 o Alaska OJJ & Gas Cons, Anchorage , , A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in t870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS · OperatiOn performed: Operation shutdown I-! Stimulate r'l Alter casing [] Other I"i Name of Operator iStandard A/aska Product/on Company Address Plugging [] Perforate [] Pull tubing [] P. o. Box 196612~ Anclx)rage, Alaska 99519-6612 ¢. Lo~ation of well at surface 860' SNL, 1245' WEL, SEC. 09, T11N, R13E, UPM At top of productive interval 1865' NSL, 1684' EWL, SEC. 04, T11N, R13E, UPM At effective depth 1981' NSL, 1657' EWL, SEC. 04, T11N, R13E, UPM At total depth 2040' NSL, 1635' EWL, SEC. 04, T11N, R13E, UPM Datum elevation (DF or KB) KBE, 57.26 AMSL feet Unit or Property name IPrudhoe Bay Unit 7. Well number J-03 (23.04.1 I- 13) PBU 8. Approval number 8-87 APl number O- 029-20025 10. Pool Prudhoe Oil Pool 1. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 10336 feet true vertical BKB 9232 feet measured 10087 feet true vertical BKB 9013 feet Length Size 85 3O 2049 20 4425 13 3/8 7936 measured Tubing (size, grade and measured depth) Plugs (measured) Junk (measured) Cemented Measured depth 107 2071 150 sx 4000 sx 2710 sx True Vertical depth BKB 107 2071 4233 10 3/4 x 9 5/8 1680 sx 2398-10034 9856'-9896; 9922'-9952; 9982'-10022', 10036'-10056', 10075'- 10110' true vertical subsea 8767'-8984' (five intervals) 7" N-80 surface-9401'; 5 1/2" L-80 9401'-9440'with 4 1/2"tailpipe to 9501' 2398-9232 Packers and SSSV (type and measured depth) RECEIVED 9 5/8" HIRSPpacker at 9440';4 1/2" SSSV & insert at 1984' 2. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure , Prior to well operation Subsequent to operation Representative Daily Averaoe Production or Iniection Data - OiI-Bbl Gas-Mcf Water-Bbl Casing PresSure 4680 22610 201 0 5020 25769 244 0 Tubing Pressure 2082 2079 4. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run I-I 5. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Title Supervisor Gravity Drainage Form 10-404 Rev. 12-1-85 Date 4/I ~/~'~ SUbmit ih DUplicat~ Well J-3 (23-04-11-13) PBU Additional Perforating Operations The following additional interval was perforated April 8, 1988 using Schlumberger 3 3/8" HSC carrier guns at 4 spf: 10075' - 10110' MD BKB (8954' - 8984' TVDss) A lubricator was installed and tested to 3500 psi for all well work. The well was returned to production immediately following perforating operations. jam 4/8/88 0800Z Oil &. Gas 6ons. Oomr~issior~ Anchor~.¢e STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Operation performed: Operation shutdown [] Stimulate [] Plugging [] Perforate r~ Pull tubing [] Alter casing [] Other [] 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 860' SNL, 1245' WE/_, SEC. 09, T11N, R13E, UPM At top of productive interval 1865' NSL, 1684' EWL, SEC. 04, T11N, R13E, UPM At effective depth 1981' NSL, 1657' EWL, SEC. 04, T11N, R13E, UPM At total depth 2040' NSL, 1635' EWL, SEC. 04, T11N, R13E, UPM 5. Datum elevation (DF or KB) KBE-- 57.26 AMSL feet 8. Unit or Property name Prudhoe Bay Unit 7. Well number ~ ;(23-04-11-13) PBU 8. Approval number 8-87 9. APl number 5 0 - 029-20025 10. Pool Prudhoe Oil Pool 1. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 10336 feet true vertical BKB 9232 feet measured 10087 feet true vertical BKB 9013 feet Length Size .. 85 30 2049 20 4425 13 3/8 ._ 7936 measured Plugs (measured) Junk (measured) Cemented Measured depth 107 2071 4447 150 sx 4000 sx 2710 sx 10 3/4 x 9 5/8 1680 sx 2398-10034 9856'-9896', 9922'-9952', 9982'-10022', 10036'-10056', 10075'-10110' true vertical subsea 8767'-8984' (five intervals) Tubing (size, grade and measured depth) 7" N-80 surface-9401 '; 5 1/2" L-80 9401'-9440' with 4 1/2" tailpipe to 9501' True Vertical depth BKB 107 2071 4233 2398-9232 Packers and SSSV (type and measured depth) 9 5/8" HIRSP packer at 9440'; 4 1/2" SSSV & insert ~"t 1~84' !::~ ~!~?~.~ "~'~. 2. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure . Prior to well operation Subsequent to operation Representative Daily Average Production or In!ection Data, OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 4680 22610 201 0 5O20 25769 244 0 Tubing Pressure 2082 2079 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge ~ :i!i.i~:~d '-~ ~' '~ Title Supervisor Gravity Drainage Form 10-404.~Rev. 12-1-85 Date Submit in Duplicate Well J-3 (2)-04-,,11-1)) PBU Additional PerfOrating Operations The followlng additional interval was perforated April 8, 1988 using Schlumberger 3 3/8" HSC carrier guns at 4 spf: 10075' - 10110' MD BKB (8954' - 8984' TVDss) A lubricator was installed and tested to 3500 psi for all well work. The well was returned to production in~nediately following perforating operations. 4/8/88 0800Z Standard Alaska Production Company ~- 900 East Benson Boulev~ P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561~5111 February 17, 1988 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perforate the well. Yours very truly, JTB:JAM Enclosures (9) cc: J. L. Haas (MB12-1) Well File ~t~r;~. nSa;epervis°r FEB ~[aska 0il & ~as Anchorage A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. S( STATE OF ALASKA ALA A OIL AND GAS CONSERVATION COM SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing E] Time extension I--I Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate ~] Other E] 2. Name of Operator 5. Datum elevation (DF or KB) Sta.ndard Alaska Product. ion Company KBR=57.26' ~SL feet 3. Address 6. Unit or Property name P. O. Box 196612, Anchorage, Alaska 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 860' SNL, 1245' WEL, Sec. 9, TllN, R13E, UPM At top of productive interval 3415' SNL, 3596 Wel, Sec. 4, TllN, R13E, UPM At effective depth 3299' SNL, 3623 WEL, Sec. 4, TllN, R13E, UPM At total depth 3240' SNL, 3645 Wel, Sec. 4, Tlln, R13E, OPM 7. Well number J-3 (23-04-11-13) 8. Permit number 69.45 9. APl number 50_029-20025 10. Pool lSrudhoe Oil ,P,omc~t% 11. Present well condition summary Total depth: measured 10336 feet Plugs (measured) true vertical 9232 feet BI~ Effective depth: measured 10087 feet Junk (measured) true vertical 9013 feet BY.B Casing Length Size Cemented Measured depth True VSrtical depth Structural B~B' 30" 150 SX 85' 85' Conductor Surface 20" 4000 S× 2071' 2071' Intermediate 16" --- 2003 ' 2003' Production 13-3/8" 2710 SX 4447' 4233' Liner 10-3/4"-9-5/8" 1680 SX 2398'-10334' 2398'-9232' Perforation depth: measured 9856'-9896', 9922'-9952', 9982'-10022', 10036'-10056' true vertical (ss) 8767'-8801', 8823'-8849', 8875'-8909', 8920'-8937' Tubing (size, grade and measured depth) 7" 26# N-80 AB-1J-4S Surface-9401'; 5-1/2" AB-TC-4S 9401'-9440'; 4-1/2" tailpipe to 9501 Packers and SSSV (type and measured depth) 9-5/8" X 5-1/2" 47# HIRSP Packer 9440'; 4-1/2" SSSV at 1984' 12.Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation 2/20/88 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed~ Title ~UPE.I'AA$Ot?,. GgAU,1W"~[Z41U4f~E' Date Commission Use Only Conditions of approval Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearanceI Approvecl Copy Returned ORIGINAL SIGNED BY Approved by ..LONNIE C. SMITH Form 10-403 Rev 12-1-85 Commissioner by order of the commission Datej Submit in triplicately/ J-3 (23-04-11-13) PBU Additional Perforation Request It is desired to perforate the following interval: 10075'-10110' MD BKB FLOW TUBES & PACKOFF BOWEN PACKOFF HAND PUMP GREASE SEAL FLOWTUBE FLOWLINE ~ FLOWLINE VALVE GREASE LINE GREASE MANIFOLD GREASE PUMP RISER BOP --..*-GREASE RESERVOIR P 0 J~o~ 1907') ..~-~ 11 I TO: DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA · GEOSCIENCES STANDARD ALASKA PRODUCTION Dete: 06/25/86 TI: 77147 Page 1 of 2!! REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The roi lowing materiel Is being submlJ-fed herewith. Please acknowledge receipt by signing · copy of this let-far and returning it to this office: A-26 '~- BHP Survey A-29 "~" " A-31 ""-BHPD A-31 ~',~BH Pres. Survey A-33 "~HPD &"PBU A-33 ~Static Gradient A-34A ~"PBU A-34A ~BHPD F-17 ~sstatic Gradient F-24 tatic Gradient J-3 ~"Static Gradient J-18 K-8 M-10 M-16 M-19 M-21 M-24 N-7 N-15 N-18 N-19 R-13 R-16 R-19 R-23 HPD 'R--PBU tatic Gradient "~survey %~" Gradient ~q.. I I II '~qq~b 1 t II I1 05/28/86 Otis 05/29/86 Otis 05/11/86 .Dres 05/09-11/86 Dres 06/03/86 GO 06/11/86 Camco 05/19-20/86 Camco 05/20/86 Camco 06/04/86 Camco 06/06/86 Camco 06/13/86 Camco 04/26/86 Otis 04/19/86 Otis 06/06/86 Camco 06/02/86 Camco 06/03/86 Camco 06/08/86 Ca~co 06/08/86 Camco 05/24/86 GO 05/31/86 Camco 06/05/86 Camco 06/05/86 Camco 06/10/86 Camco 06/11/86 Camco 06/07/86 Camco 05/21/86 GO Static Gradient II II INFORNAT I ON CONTROL Well Records LR2-1 Date: 06/25/86 T#: 77147 ~-1 R~BHPD & Flowing Gradient S-16 _~Static Gradient 05/27/86 U-2 '~ " " 06/01/86 U-10 "~BHPD ~Flowing Gradient U-12 ~'Static Gradient 05/27-28/86 ~-~ 22-11-12 Static Gradient 03/16/86 Page 2 of 2!! 05/13/86 Camco Camco 06/01/86 Camco Camco Camco Camco Anchorage Victoria Aldridge LR2-1 Well Records LR2-1 INDEXED SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON · · To:SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS STATE BPAE (Transmittal Only) 311 I "C" STREET ANCHORAGE. ALASKA TELEPHONE 19071 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99.502 Date: T#: 12-19-85 76642 REFERENCE: SOHIO FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- Static Gradient 12-13-85 Camco Static Gradient 12-07-85 GO Static Gradient 12-10-85 Camco Step Rate Flow Test 12-10-85 GO Static Gradient 12-09-85 Camco Static Gradient 12-11-85 Camco Static Gradient 12-05-85 GO Static Gradient 12-13-85 Camco Static Gradient 12-16-85 Camco Static Gradient 12-13-85 Camco RECEIVED DATE C0mm~o~thy Perkins LR 2-1 ..... Technical Documentation Reco=ds ~nagememt INDEXED SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON ~o: SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS ~: STATE BPAE (Transmittal Only) 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 09/20/85 T#: 76448 REFERENCE: SOHIO FINAL DATA- PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- ~ R-17 Static Gradient Flowing Gradient 08/15/85 Camco 08/07/85 Dresser OAT~ §-C[~ ,9 . Records Management .... . Oommismon Anchorage SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON ,o SFOfUNIT/STATE: TE;LACO (-.Marathon) : MOBIL PHILLIPS STATE OF AK BPAE 3111 "C"STREET ANCHORAGE. ALASKA TELEPHONE (9071 2G5.O000 MAIL: POUCH 6-6 I 2 ANCHORAGE. ALASKA 99502 Date: 09/13/85 T#: 76431 REFERENCE: SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- X~A-16 ' DFT 08/22/85 #1 10500-11400 Camco 5" '"~'JA-34''~ GCT Gyro Survey 05/16/85 #1 SURF-9650 Sch 5" ~"~'F-19 -- CET 01/20/85 #1 11622-12814 Sch 5" "~w H-9f Completion Record 06/21/85 #2 8657-9830 Sch ~ 5" ~ J-3-- CET 03/22/85 #1 9500-10088 Sch 5" "~JQ-1/ CET - (RE-RUN) 03/31/85 #1 8900-9770 Sch 5" ~ R-17'~ PLS 08/09/85 #1 10330-11000 Dres 5" ~'~Y-11j DFT 08/24/85 #1 9650-10300 Camco 5" ~Y-11'~ Spinner 08/24/85 #1 9650-10300 Camco 5" x~ Y-18~- Completion Record 06/20/85 #2 10810-11270 Sch 5" R£C£1VED "'~'"~ ~-~'-~' -~0~5 ~°V'~S~r' Victoria Aldridge LR2 1 ~ /' ,. ~ %:~ b - ' Technical Doc~ · ~35%3 06~ ~nC,~%~ ' Records Managem~at-On SOHIO ALASKA PETROLEUM COMPANY TO: SFO/UNIT/STATE: (-Marathon) 311 1 "C" STREET SFO ARCO CHEVRON EXXON GETTY MOBIL PHILLIPS ANCHORAGE. ALASKA TELEPHONE (907) 265-O000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 7/22/83 CC#: 74588 STATE OF AK BPAE (Transmittal Only) CENTRAL FILES(CC#'s-Transmittal Only) REFERENCE: ID CASED HOLE FINAL LOGS . The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- D-4'"" E-9 F-7 F-8' F-ii G-4 CNL 5/16/83 #3 9900-10673 Sch 5" CNL '5/16/83 #10 9900-10667 Sch 5" CNL 5/17/83 #1 9595-10907 Sch 5" CNL 5/14/83 #1 1:1160-11885 Sch 5" CNL 5/13/83 #5 10500-11194 Sch 5" CNL 5/13/83 #1 8900-9586 Sch 5" CNL 5/18/83 #3 9400-10304 Sch 5" 5./18/83 #1 8650-9418 Sch 5" 5/19/83 #3 9500-10090 Sch 5" 5/11/83 #2 8750-9395 Sch 5" 5/14/83 #5 11160-11898 Sch 5" 5/12/83 #2 10630-11578 Sch 5" ~Completion Record 4/23/83 #1 8600-9250 Sch 5" EPL 5/15/83 #1 11380-11850 Sch 5" EPL 5/12/83 #1 10740-11150 Sch 5" G-13 .... 'CNL J-3 CNL B-12.' DDNLL -. F-7" DDNLL ~. X-7-, DDNLL H-6' .F'7 -' X'7 J (4/82) RECEIVEO DATE Victoria Aldr idge Development Geology .Well Records TP1-5 SOttlO ALASKA ?EIF{OI_EUF~ 10: SFO ARCO EXXON PHILLIPS '- . . STATE OF AK CENTRAL FILES(CC#'s-Transmittal Onlx 31 1 1 "C" S1R[ E'~ /.N'CH, O[~AG[. At ASKA IELLPHONL (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 7-19-83 074579 Trans.~' cc#: Pg. 2of 2 REFERENCE: SOHIO MAGNETIC LIS TAPES & LISTINGS The i'ollowing malerial is being submitted herewith.-Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- " Acc # ~*~i15 RFT 6-13-83 run 1 Sch 68374 ~-'15 open hole tape 6-13-83 run 1 SCH 68374 , .*Y-2 TDT-M ' 6-5-83 run 2 Sch 68354 ~ ~,. '~ 7' / ,*A-..ll TDT-M 5-20-83 run 2 Sch 68322 ;,,-!: ': ,['j' ~*B-15 CH CNL 5-17-83 run 1 Sch 68348 )', ,~t~.. :.. _ ,x_ 12 /:, . . --,-- .. ' ..... DUNLL 5-16-83 run - Dres 1719. · -'" ," /'3-14 open Hole tape 5,26-83 ru~ 1 Sch 68347 :. -*J-3 CH CNL 5-19-83 run 3 Sch 68313 -*B-8 CH CIqL 5-28-83 run 1 Sch 68349 ~-4 CH CNL 5-18-83 run 3 Sch 68311 .~ ,.~ ... , --- · _. . , .. (..-/ .. :-. '-7 h". ,~.-/'"/ ", c:'~ ~'."~ ' -~ · '? " ..> i ::;: .... ~ ; /" ' , / ~",: ~. .-- - ... ":" "::,," ~' ::]'" :,: ~ .~ - :2 ':/:4, ?-- / ' ......~_/-"I .,5' .;'f. ,.'"/.' ~'_ ~ ,? I -'-~-' ,,' ,' :; /: :J--- / :' 7,. · :,, -... ...'..',..... - -.:? .?.:,: >, ... ,:'. t:--:'-"~..:.?-~'. , ~::,./ .-. ,- , , . .' . ~.--, ::.,,_~. :,...,,._ '- :'~" :1 ..:m " .... : ,": · SFO & ~0~' ~Aste:is~:(*) ~t to a Z~st~E a~o~e mea~s ~ou s~ou~a Please confi~ this. ~. ~/:~l ,.~/ ' Development Geology DATE ~9 Well Records ot,/l f 1: I itOl I:Ui~I CO;,At'Ar~Y SOltlO ALAc ' SFO ARCO I[IEPHO;JE i907) 265-0000 MAIL: POUCH 6-612 ^NCHORAG[, ALASKA 99502. 10: EXXON PHILL1PS STATE OF AK Date: 7-19-8.3 Trans.#: 074579 cc0: CENTRAL FILES(CC#'s-Transmittal Only · /7/ /4L:-7" _~ ,.__. .~.. -b'.-- ' 2/''- I:~. 1 of 2 ,4,1.--z,l , ~' 1-".-."~ .s '" ,:': .z .... ,.'" ~._, I / 77 ~ -' / 7',?',. '1 ' -' " ?' 7 , REFERENCE: ~ ' '~ SOHIO MAGNETIC LIS TAPES & LISTINGS The following malerial is being submitted herewilh.-Please acknowled§e receipt by si§ming copy of lhis letter and returning it to this office-.'-- /.,: , ~:...,*"z 01 ';::' -' '," .- ": "' ' ~ -. r<.' 2.':/.':, ~7 :" :,'.J , , , ,,. ....... - ..~ ,~,.... "~ _.. '7 "' //''' i '' ~ ,:.'- ~ t ';' ''~ . ,t · :,..,. Ot 7-'. · : (..~ .... .,. -,,.,., .: ,. .... . ACC. --*C-10 Ctt CNL 6-23-83 ~ i Sch 68405 .,-*N- 4 TDT-N 5-23-83 rrm 3 Sch 68324 ,,~3-12 5DT-N 5-11-83 ~ 2 Sch 68319 --*F-3 CH CN%- 5-30-83 run i Sch 68350 ,-*X- 7 ~ 5-12-83 rrm 2 Sch 68292 ,~F-i1 CH CNL 5-13-83 run i Sch 68276 ~ ,*N-6 TDT-M 5-18-83 run 3 sch 68305 68 08 '[~.!~ [~/ ~7-18 CH CNL 6-14-83 run 1 Sch 68375 .<o, /'.~'~ -- J-16 Open Hole 7-18-83 run - Go 228622 · ~,~ ..... , ....,. .... . .............. 7 Open Hole 6-21-83 run - GO 228610 ~ Hole 6-9-83 rLm - Go 10229~ ~?,...-I' '"':'I ,: . Z ~ -' ,: , ~ .-;v .. 7',. ? T ir - "~ C-f' .'-:: ' ( / -- /.'::;"~ / 7 ,,"; -/:,,), ,,; . /~,....., -/:~ (.:.,.!.,;...... _.f,. ._ , . ...~,, .. f " .- r .,- . / ,_ .i,,,, /t ..... x,'/ ,. i ," ' -" D r ' ' . , .~ .~. .... ,,,.~ .... ,.,.;-;- .. · SFO & EXXON" AnAsferi'sk:(*) next to a l~.sting, abouv,e'-means you should have received the Tape(s) and Listing(s) directly from the respective service company. ~EC~WEO. [u./ , Ut, ~t,--,. ~~/~ Development Geology o~'r£ ~s ~ Well Records SOHIO ALASKA PETROLEUM COMPANY · C-8~, H-7!, TO: 'SFO/UNIT/STATE .(-Marathon) Jl~J~ I __ ,, i L i 1:~11~ -- I , Jll II I _ REFERENCE: 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99 502 Date: 7/29/81 # 95'8' /.~'~SOHIO FINAL. DATA CASED HOLE FINAL LOGS ~""The following material is bein~"~ubmitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/UNIT/STATE: .(-Marathon)' ' CNL/Cased Hole (Sch) II II Il II Il II II I! II II I~ II II II II II II II II II II II II II II II II II 6/16/81 6/14/81 6/7/81 6/12/81' 6/3/81 6/8/81. 6/6/81' 6/7/81 & 6/7/81 DATE #2 5" #5 5" #5 5" #2 5" #7 5" #1 5" #4 5" #1&2 5" Carol Krieter Development Geol.ogy Well Records SOHIO C(' -IDENTIAL SOHIO ALASKA PETROLEUM COMPANY ARCO TO: . SFO/UNIT/ST:  I~ i --, ~ __ ii i Ill I 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 5/13/81 '#' 794 ' SFO/UNIT/STATE: (-Marathon) REFERENCE: SOHIO FINAL DATA " olloWing material is being Submitted herewith. Please acknowledge receipt by signing of this letter and returning it to this office:- _ B-8 )--Letter rega.~ding the listed wells: ,,Summary of Problems Associated '-with 2-3/q-U. CNI~"s by M.O. Dolly. 5/8/81 X-1 X-8 X-12 Bottom-Hole Pressure Data Form & Survey Bottom-Hole Pressure Data Form & Survey (Go) 4/18/81 (Go) 4/18/81 (Go) 4/27/81 ,,,,/ .,-. ,. - RECEIVED Z//~'~C"" MAY ~Y1981 aec~,v~o Alaska 0ii & Gas 00as. C0mm;ss;0. Anchoragq 9 DATE - Carol Krieter Development Geology Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: SFO/I/NIT / STATE: 3111 'C" STREE' ANCHORAGE, ALA: TELEPHONE (907) 26 MAIL: POUCH 6-6 ANCHORAGE, ALASK~ 3/9/81 -]F' [CO,V~,M i<5~.-'~,-~,--~:.,.G" 99~ FNG ~' 1 GEO~ )..STAT rFC STAT TEC ..... ~ ............... REFERENCE: yIO FINAL DATA //The following material is being submitted herewith. Please acknowledge receipt by signing a L/' copy of this letter and returning it to this office:- SFO/UNIT/STATE: B-8 CNL 11/21/80 #3 (rMarathon) E-2 CNL 12/8/80 #6 Fe F_-~~~ CNL 2/13/81 #6 . CNL 11/21/80 #1 MM Track W -11-12 CNL 2/20/81 #3 D-15 Spinner Flowmeter 2/19/81 #1 Y-3 Spinner 2/14/81 #1 . ._ SFO/UNIT/ MP Trackwell(22)31-11-13 FDC/CNL 2/1/81 & 2/7/81 #1&2 STATE: MM Trackwell(22)31-11-13 FDC 2/1/81 & 2/7/81 #1&2 5"(see remark 5" on this se 5" of logs~) 5" 5" 5" 2" 2'7 Ahska Oil & 0;'.t, Cons. Coll'liTliSsioii Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DiVISIO~~,.~.~ TO: S FO/UN IT / STATE: ANCHORAGE, A LASK.~ .... i coM,~-~ ..... ! _CO,',^.~x Z' _ 3111 "C" STREEJ 3~r-;,.! .-, - TELEPHONE 1907} 2G.C,-00~u - ~ ~, _ i STATTEC '- REFERENCE: FO/UNiT/STATE: -Marathon) Sohio Final Data ~,'"/The following material is being submitted herewith. Please ar. knowledge .. c~nv nf this letter andxeturnina it tn this A-14 CNL 12/5/80' B-7 CNL 12/18/80 B-8 CNL 11/21/80 C-2 CNL 12/16/80 D-ii Spinner 12/10/80 E-4 CNL 12/15/80' F-1 EPL 12/23/80 ~ CNn 11/21/80 Q-2 CNL 11/20/80 .. receipt by signing a f/3 5" ¥12 5" f/3 5" ~)4 5" t/1 5" ~t3 5" ill ¥/1 5" ~'t2 5" Alaska 0il & Gas Cons. Commission Anchorage Carol Krieter Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION A~CO TO: EXXON PHILLIPS SFO REFERENCE: SOHIO MAGNETIC LIS TAPES FILF: 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAI L: POUCH 6-612 ANCHORAGE, ALASKA 99502 12/19/80 #534 The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- B-8 MAGNETIC LIS TAPE C-8 " " "  ~l II II 3-5 " " " H-7 " " " * M-14 " " " Q-5 " " " Y-2 " " " * Y-11 " " " #61177 11/21/80 #61202 11/24/80 #61211 11/21/80 #61200 11/23/80 #61176 11/24/80' # 11/26/80 #61201 11/20/80 #61214 11/24/80 #61112 10/18/80 #61210 11/11/80 ~/3 · '/t2' #2 Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: SFO/UNIT/STATE Marathon Mobil -- Ph/ll~p~ - ' BP^E' SFO REFERENCE: 3111 "C'° STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-001 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 995 7/30/80 #2[ SOHIO DATA following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- 3FO/UNIT/STATE: B-7 Bottom Hole Pressure Da a Fo & Sur ey B-14 " " " ./Vrv,,. ~e D-4 " "' "' " " " ~ D-5 " " " " " " , '/~ D-5 " " " " " " ~/~¢. F-3 ;~ " " ""' " " "  F-7 " " " " " " II Il II II II II · Bottom Hole Pressure Data Form & Survey RECEIV~~ DATE 19 7/13/80 (Otis) 7./15/80 (Otis) 7/5/80 (Otis) 7/12/80 (Go) 7/18/80 (.60) 6/17/80 (Schl.) 6/20/80 (Otis) 6/19/80 ( l ~ o) 6/17/80 (Go) Carol Kr ieter Well Records Redi-Kwik, Quality Litho SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION TO: Depar'm~ent of Natural Resources Dixdsio'~ of Oil ~ Gas Conse~a~ :3(~0t. ]:t;rc',~?i:m l)rive Aq'TN: h[l{. il. 3111 .... STREET TELEPHONE (~01) MAIL: POUCtt 6-612 ANCHORAGE, ALASKA 99502 State/P&P February 14, 1979 REFERENCE: Well Data Transmission The following material is being submitted herewith. Please acknowledge receipt by signing a / copy of this letter and returning it to this office:- /1' sepia and 1 print for ,, ~ B-11 DIL-TVD 5" BHCS-TVD 5" FDC-TVD 5"  ' CNL/FDC-TVD 5" ~ B-12 DIL-TVD 5" BHCS-TVD 5" FDC-TVD 5"  CNL/FDC-TVD 5" ~ __ Spinner Log Run '~C- 6 Spinner Log Run the following Sohio opez[ated wells: & 2" & 2" & 2" & 2" & 2" & 2" & 2" & 2" 2 5" 2 5" -/ . L,//1 copy of the followinq data: 8 Transient Pressure Survey/Data Packet Transient Pressure Survey/Data Packet Pressure Analysis (Corrected Survey) 1-26-79 1-21-79 12/21-23/78 12/15-18/78 · · Colette Tr,acy Well Records COMPANY P,e~urces Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, AK 99504 TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 DEV-PB-250/8 November 30, 1978 REFERENCE: Well Data Transmission The f°ll°wing material is being submitt~ herewith' Please ackn°wledge receipt bY signing a c~'/' ~. ~,J?,~-"/' ~/~fy copy of this le~er and returning it to this office:- / , ~1 print sepia the followin~ Sohio operated wells: and 1 for  B-7 CNL Run 1 5" "' B-2 CNL Run 3 5" N-2 CNL Run 1 5~' GC-3B Engineered Production Log Run - Production Profile " " " Run 3 & 4 5" A-5 Transient Pressure Survey 11-17-78 E-1 Transient Pressure Survey li-02-78 Transient Pressure Surveys for the following wells enclosing pressure gradient survey data sheet, pressure gcadient survey graph, pressure build-u~ / ey data sheet, field data, pressure and temperature: 10-17-78 J-6 11-Z3-78 G-3 10-06-78 Colette Tracy Well Records SOHIO PETROLEUM COMPANY Divi:i:. ::" .... :'~ral Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alas~ Division of Oil & Gas Conservation 3001 Porcupine Drive ~harage, AK 99504 Attn: Mr. H. H~milton REFERENCE: ~,~1 Data ~sion 3111 "C" STREET TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 DAV-PB-250/8 November 22, 1978 The following material is being submitted herewith. Please acknowledge receipt by signing, a copy of this letter and returning it to this office:- State Rss~~ Pr._essure Report - Fozm P-12 for ..t~e_._ .following ~ells: B-7 11-3-78 B-8 11-7-78 N-7 11-1-78 E-1 11-2-78 J-6 11-14-78 <~ 10-14-78 i~-17-78 B-4 10-23-78 ~21-4 11-2-78 F-6 11-5-78 F-5 11-10-78 F-7 11-11-78 C-1 11-14-78 Initial Static Survey I1 Il ~! !1 Key Well Survey Go~tal Sectim Surveys If gl |t Il I! Colette Tracy Well Reoords RECEIVED DATE 19 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Dr. Anchorage, AK 99504 Attn: Mr. H. Hamilton REFERENCE: Well Data Transmission 3111 °'C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH6-612 ANCHORAGE, ALASKA 99502 DEV-PB-250/8 November 22, 1978 HKVP The following material is being submitted herewith. Please acknowledge receipt by signing a~ copy of this letter and returning it to this office:- ~ r/~2/~3~~ 1 sepia and 1 print for the followin~ wells: B-2 Spinner Survey Run 1 5" D-5 Spinner-Temp. Run 1 5" Hewlett Packard Pressure Data for the following wells: enclosing pressure gradient survey data sheet, pressure gradient survey graph,  sure build-up survey data sheet, field data, pressure and temp. 10-17-78 w~-6 7-20-78 ~'E-1 7-11-78 ~-2 7-26-78 wC-7 8-29-78 WC-4 9-14-78 Ail of the above pressure reports are Transient Pressures Colette Tracy Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Division of Oil & Gas 3001 Porcupine Drive Anchorage, AK 99502 3111 "C" STREET ANCHORAGE, ALASKA TE LEPHON E (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 DEV-PB-250/8 September 22, 1978 REFERENCE: The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: ....... Government Sectional Survey-(J-3~ Initial Transient Pressure Surveys for A-7, C- 6/,, //~- ~, B-3A the followin~ wells: ,~,,,Well Transient Surveys for the following wells: ~~.> A-5,~ D-6~,"' B-2~, C-2~, E-1~, J-~, H-8- Colette Tracy Well Records RECEIVED DATE 19 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Aia~,,a Department of Natural Re:,ource.~ Dlvisio~ of Off & Gas Conservz:t~on 8001 Porcupine Drive 2knehorage, Alaska 99504 ~k'I"I~ MR. II. HAMILTON 3111 "C'" STR E. I~T'. .. ANCHORAGE, AbASKA TELEPHONE (907) 265-0000 · '-- _ . MAIL: POUCH 6)612 ANCHORAGE, ALASKA [19502 ~. August 21, 1978 REFERENCE: The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- Key Well Transient Survey for the following wells: N-7 G-3 .K. ey Well Initial Transient Pressure Survey for the foil. owing wells- A-5 C-2 Initial Transient Pressure Survey for the following wells: C-8 A-1 A-2 A-3 A-8 B-4 C-1 C'-5 Governnkent~l Section Tran%ient Pressure Survey for the following_j, ells: ~-8 ~ E-2 D-4 D-1 E-3 E-4 E-5 G-2 H-4 H-5 J-5 M-3' M-4 ' H-6 ~ J-1 D-3 H-3 D-4 Initial Static Surveys for the followin~ well: B-3A RECEIVED DATE SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99504 Attn: Mr. O.K. Gilbreth 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907)265-0000 MAI L: P. O. BOX 4-1379 ANCHORAGE, ALASKA 99509 DEV-?B-250/8 JUne 8, 1978 REFERENCE: The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- 1 sepia and 1 print fo'r the f'o'llowin~ report: D-1 (23-11-13) (04-11-13) N-1 (08-11-13) 1 print of. the GC-3B Engineered Flow Profile Run 2 Spinner Survey Run 1 Flowmeter Run 1 foll'owin~ well: Mud Log 5!! 5I! 1! Colette Tracy Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Division of Oil & Gas 3001 Porcupine Drive Anchorage, AK 99504 Attn: Mr. O.K..Gilbreth 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907)265-00Q0 ' MAIL: P. O. BOX 4.1379 ANCHORAGE, ALASKA 99509 DEV-PB-250/8 June 1, 1978 REFERENCE: The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office'- l-sepia and 1 print for the following wells: H-4 CCL-Spinner-Temp. Diff.-Temp.-Flowmeter Spinner-Temp. Run 1 5" Run 1 5" Run 1 5" N-3 Spinner Run 1 5" Colette Tracy Well Records d U - 5 SOHIO PETROLEUM COMPANY Division of Sohio Natural 'Resources Company 3111 "C" STREE'T1 - ANCHORAGE, ALASNjA i 1,~ ~,!G '1 -'~ TELEPHONE (907)265-0000 SOHIO-BP ALASKA PRODUCTION DIVISION State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99509 MAIL: P.O.BOX4-1379. .. ANCHORAGE, ALASKA 99509 · __ -. DR~FT SCC ATTN: Mr. O.K. Gilbreth, Jr. Gent 1 emen: 41-21-11-13) 23-04-11-13) GC-2B (16-11-13) GC-2A (16-11-13) Enclosed please find in triplicate, form 10-403, Sundry Notices and Reports on Wells, and in duplicate, form P-4, Monthly Report of Drilling and Workover Operations, for the above mentioned wells. Very truly yours, Sohio Petroleum Company G. D. Taylor~ Manager Operations GP:bs cc: P.E. Well files Drilling Well files ~)~ Submit "1 ntentlons" in Triplicate ~' & "Subsequent Reports"' tn DuDIIcate (~ ~ STATE OF ALASKA 5. APl NUMERICAL CODE OIL AND GAS CONSERVATION COMMITTEE Form 10-403 REV. 1-10-73 SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals tO drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 1. Ow~LLL[--~ GAS D OTHERWELL 2. NAME OF OPERATOR SOHIO 'P¥.TROT~EU[V[ c0~m~-~ A DIVISION OF SOHIO NATURAL RESOURCES COMPANY 3. ADDRESS OF OPERATOR P.O. Box 4-1379, Anchorage, Alaska 4. LOCATION OF WELL At surface 99509 1245' W-EL, 860' SNL, SEC. 9, TllN, R13E, UPM ELEVATIONS (SIsow whether DF, RT, GR, etc.) Y~E 57.26' .A~SL Check Appropriate Box To Indicate .Nature of Notice, Re NOTICE OF INTENTION TO.' TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS 50-029-20025 6. LEASE DESIGNATION AND SERIAL NO. ADL 28281 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE' NAME PRUDHOE BAY UNIT WEST 9. WELL NO. - . J-3 (23-04-11-13) 10. FIELD AND POOL; OR WILDCA~ ..... PRUDH0g BAY, PRUDH0g ~A¥ .0IL PO( 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)" SEC. 4, TllN, R13E, UPM 12.'PERMIT NO. 69.45 3orr, or Other Data SUBSEQ'UENT REPORT OF.. WATER SHUT-OFF E~] REPAI RING WELL. FRACTURE TREATMENT~.~ ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE~ Report results of multiple completion on Well Comlsletlon or Recompletion Report anti Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state ali pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. The following work was performed in conjunction with the matri~ acidiza~i~n treatment of Well J-3. The operation was completed on February 11, 1978. 1. Conducted static pressure and flowmeter survey. 2. Acidized well with 25,500 gallons of 15% hydrochloric acid containing 0.5% Al70 inhibitor, 0.8% W-35 demulsifier, 0.2% F-75N surfactant, 0.1% J-237 diverter and 135 lb/1000 gal. L41 iron sequesting agent. ~.SS~)' ~ the acid was 3. The acid was followed by 20 of diesel overfluSh~and displaced into the~i-r~i~by 400 bbls diesel ~yflu~h. 4..The well was flowed to the flarep~t dur~ng*a, a hort cle~q~up period - ~. / .~ '~,- to dispose of spent acid waters, the well was re~ur~e~ to test bank followed ~y a transient pressure and flowmeter 16. ! hereby certify that the foregoing is true and correct (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE. . . DATE . See Instructions On ReVerse Side Form No. P-4 REV. 3-1-70 SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS WELL WELL OTHER 2. NAME OF OPERATOR SOHIO PETROLEUM COMPANY A DIVISION OF SOHIO NATURAL RESOURCES COMPANY 3. ADDRESS OF OPERATOR P.O. Box 4-1379, Anchorage, Alaska 99509 4. LOCATION OF WELL 1245' WEL, 860' SNL, SEC. 9, TllN, R13E, UPM 5. APl NUMERICAL CODE 50-029-20025 6. LEASE DESIGNATION AND SERIAL NO. ADL 28281 7. IF INDIAN'ALOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME PRUDHOE BAY UNIT WEST 9. WELL NO. J-3 (23-04-11-13) 10. FIELD AND POOL, OR WILDCAT PRUDHOE BAY, PRUDHOE~ BAY OIL PO( 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) SEC. 4, TllN, R13E, UPM 12. PERMIT NO. 69.45 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. 25 January 1978 Conducted Pre-Acid Flowmeter SurVey; 26 January 1978 Acidized well with 25,500 gallons diesel/surfactant mixture followed by 20 bbls diesel overflush. The acid was displaced into the formation by 400 bbls diesel. The well was then flowed to a flare pit during a short clean up period to dispose of spent acid waters. 29 January 1978 Flowed well to test bank for 24 hours. 11 February 1978 Conducted Transient Pressure and Flowmeter Survey. 14. SiGNEDI hereby certify t~~e and correct TITLE /L~~.~~. ~~ DATE '~/~7'~ / / NOTE--Report on this form is required for each calendar month, regardless of the/ status of operations, and m~ust be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. BPALASKA INC. 31'11 - C - STREET · TELEPHONE {907! 279-0644 C O N F I D E N T I Division of 0il 3001 Por~e ~i~ ~el1 ~: 23-23-11-13) 23-04-11-i3) Enclosed please find in triplicate: Form 10-403, Sundry Notices and Reports on Wells; for the above named wells. sf cc: BP Well File J-3 Bp Well File D-1 Drilling Well File J-3 Drilling Well File D-1 Very truly yours, BP ALASKA, INC. Manager Operations RECEIVED LIE C 2 1 i97/' Divi¢ten ~f 0tl & ~a~ O.~'l~ervation Anchor2rJo ~orm ! 0.-~.03 REV. 1-10-.73 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to-deepen Use "APPLICATION FOR PERMIT--" for such proposals.) WELL ! ! OTHER 'NAME OF OPERATOR BP Alaska, Inc. ADDRESS OF OPERATOR - P.O. ]9c~ 4-1379 ~c~horage, _~J~3~s]<a 99509 4. LOCATION OF WELL At surface 1245' WEL 860' SNL Sec~ 9, TllN, R13, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE 57.26' AMSL . ]4. Check Appropriate Box To Indicate Nature of. Notice, Re 5. APl NUMERICAL CODE 50-029-20025 6. LEASE DESIGNATIO. N AND SERIAL NO. .- ADL 282'81 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit West WELL NO. * J-3 (23-04-11-13) _, 10. FIELD AND POOL, OR WILDCAT 11. SEC., T., R., M.~, (BOTTOM HOLE OBJECTIVE) - Sec. 4, TllN, R13E, UPM 12. PERMIT NO, 69.45 )orr, or Other Data SHOOT OR AClDIZE REPAIR WELL (Other) NOTICE OF INTENTION TO; FRACTURE TREAT MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSE(~UENT REPORT OFt WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASIN(:~ SHOOTING OR ACIDIZING ABANDONMENT' (Other) (NOTEi Report results Of multiple comPletion On Well Compi~tlon or Recompletion Report- and Log form.) DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all I~rtlnent details, and give pertinent dates, including estimated date of .starting a ny proposed ~work. . _ The folloWing synopsis outli~es the matrix aci~zation treatment proposed for this well to r~nove calcium carbonate deposits in the near well bose region. This operation will be performed in January 1978. The well will be flowed to .the test. bank at reduced first stage separator pressure to obtain pre-treatment test data. A flo~r~ter survey .will be run. The well will be re-perforated, if required, to induce flow. After establishing'an injection rat. with. diesel,' the well will be acidized' with 10,000 gallons of 15% hydrochloric acid containing 0,5% A 170 inhibitor, 0.8% W-35 demulsifier, 0.2% F-75 N surfactant, 0.2% J-237 diverter and ' 135 lb/1000 gal. L 41 iron sequestering agent. The acid will be followed'by 20'bbls of diesel overflush and the acid will be displaced' to the formation, by.' 400 bbls diesel;- 'At no time during the 'treatment will fracture gradient pressures be exceeded. ~-. - 0 After a short clean'up period to flare to dispose of spent acid water's the well will be returned to the-test bank for post acidization flow testing. A fl~er / DATE See Instructions On Reverse. Side ,,p alaska INC.! - - STREET · TELEPHO~IE (907) 279-0644 CONFIDENTIAL State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Hoyle Hamilton Director MAILING ADDRESS: P.O. BOX 4-1379 ANCHORAGE. ALASKA 99509 October 13, 1977 Gentlemen: Well Number BP J-3 (23-04-11-13) Enclosed please find in duplicate, Form P-4, Monthly Report of Drilling and Workover Operations; and in triplicate, Form 10-403, Sundry Notice and Reports on Wells for the above named well. Very truly yours, BP ALASKA INC. G. D. Taylor Manager Operations rtm cc: Drilling Well File P. E. Well File ( Form No. P-4 '~ SUBMIT IN DUPLICATE REV. 3-1-70 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING 5. APl NUMERICAL CODE 50-029-20025 AND WORKOVER OPERATIONS 2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME BP ALASKA, INC. Prudhoe Bay 3. ADDRESS OF OPERATOR 9. WELL NO. P.O. Box 4-1379 Anchorage, A~aska 99509 J-3 (23-04-11-13) SNL, SEC. 9, TllN, R13E, UPM 4. LOCATIONOFWELL 1245' WEL, 860' 6. LEASE DESIGNATION AND SERIAL NO. ADL 28281 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudboe Oil Pool 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 4, T liN, R13E U?M 12. PERMIT NO. 69-45 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. · PERFORATING AND ASSOCIATED OPERATIONS 28 August 77 Recovered S.S.S.V. from insert sleeve in nipple at 1984' BKB. Ran pressure/temperature survey and CCL/GR. 29 August 77 Reperforated the following intervals and added one interval using Schlumberger 2 7/8" hyperdomeS, Hyper Jet II, 4S.P.F. Old Perfs. New Perfs 985:6-9896 ft. BKB (ref. BHCS/GR, 1-1-70,Run 3B) 9922-9952" ( " ,, ) 9982-10022" ( " ,, ) 10036-10056 " ( " ,, ) The well was floWed fo~ a short period of time before, during and after each shot was fired to clear perforations. 1 September 77 Ran and set S.S.S.V. Discovered leak. Recovered and then reran S.S,S.V. Tested S.S.S.V., swab valve, master valVe. End of Operations. The well was left with the S.S.S.V. closed and with the wellhead valves closed (except the surface safety valve). 14. I hereby c~,tlfyj~--~.~regoing/s tru~and correct NoTESIGNED-Re L~~___/ ~ TITLE ~~~//._ [/~~~ DATE g~O/4~'~ -- port on this form is required for each calendar month, regardles~of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. Form 10-403 REV. 1-10.,73 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) WELL [--J OTHER 2. NAME OF OPERATOR BP ALASKA, INC. 3. ADDRESS OF OPERATOR ?.0. Bo× 4-1379 4. LOCATION OF WELL At surface Anchorage, Alaska 99509 1245' WEL, 860, SNL, SEC. 9, TllN, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE = 57.26' AMSL 14. CheCk Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20025 6. LEASE DESIGNATION AND SERIAL NO. ADL 28281 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Pr,_,dhoe _nay 9. WELL NO. .T-3 (? ~-n/,-ll-13~ 10. FIELD AND POOL, OR WII'DCAT Pr11~]hn~ Rmv. Pr,r~hn~. ~q'l ~nnl 11. SEC., ¥., R.,~I:;~(I~O'~'I=O-IVTROEE O~3ECT~VE) SEC. 4, Tll N~ R 13 E, UPM 12. PERMIT NO. 69-45 )orr, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF.' WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR AClDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. The following intervals in this well were reperforated on August 29, 1977, and one interval was added. The shot density was 4 S.P.F. Old ?erfs. 9856,9896 ft. BKB (ref. BHCS/GR, 1'1-70, Run 3B) " 9922-9952 " ( " " ) " 9982-10022 " ( " " ) New Perfs. 10036-10056 " ( " " ) A static bottom hole pressure/temperature survey was conducted prior to perforating. Prior to perforating ran a CCL/GR. After perforating.~an~and set insert sleeve in nipple at 1984' BKB. The sub-surface safety ~lve was closure tested on September 1, 1977i!.iii~ il ~ ~ 16. I hereby certify that the foregoing is true and correct SIGNED (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side BP ALASKA INC. 3! 11 - C - STREET · TELEPHONE (907} 279-0644 State of Alaska Department of Natural Resources DiVision of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, AK 99504 Attention: Mr. Hoyle Hamilton Director Gentlemen: Well No's J-1 (31-09-11-13) (23-10,11-13) 3-04-11-13) J-5 (23-03-11-13) ¢ MAILING ADDRESS: P.O. BOX 4-1.379 ANCHORAGE. ALASKA 99509 July 1, 1977 I J 3 ENO ___ J 4 J~NG J $ ENG J t OEOL j 2 GEOL J 3 G'EOL ..... L_ R~ J DRAFT j CONFER: FILE: Enclosed please find, in triplicate Form 10-403, Sundry Notices for Perforating Wells J-l, J-2, and J-5 and for reperforation of well J-3 if required. GP/dmd Very truly yours, BP ALASKA INC. O~~r . Manager Operations RECEIVED JUL "5 '~977 Divi~t~d of Oil ~i!Cl Ga~ Form 10-403 REV. 1-10-73 Submit "Intentions" in Triplicate "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 5. APl NUMERICAL CODE 50-029-20025 6. LEASE DESIGNATION AND SERIAL NO. ADL 28281 1. OIL ~'~ GAS ~ 7. IF INDIAN, ALLOTTEE OR TRIBE NAME WELL ~i~_J WELLil OTHER 2. NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME BP ALASKA INC. PUT RIVER 3. ADDRESS OF OPERATOR 9. WELL NO. ?, 0, :BOX 4-1379, Anchorage, AK 99509 .1-3 (23-04-11-13) 4, LOCATION OF WELL At surface 1245' WEL, 860' SNL, SEC 9, TllN, R13E, UPM ]3, ELEVATIONS (Show whether DF, RT, GR, etc.) KBE 57' AMSL 14, Check Appropriate Box To Indicate Nature of Notice, Re 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) SEC.4, TllN, R13E, UPM 12. PERMIT NO. 69-45 ~ort, or Other Data NOTICE OF INTENTION TO: FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT Of: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state al pertinent details, and give pertinent dates, includingestimatecl clate of starting any proposed work. The following intervals in this well were perforated (at 4SPF) in 1970. 9856-9896 ft. BKB (40') (ref. BHCS/GR 1-1-70 Run 3B) 9922-9952 " (40') ( " ) Reperforation of these intervals may be required as well as addition of the following interval: 10036-10056 ft. BKB (20') (Ref BHCS/GR 1-1-70 Run 3B) After perforating operation a static bottom hole pressure survey will be conducted. The well will be left with a SSSV in the nipple at approximately 2000 ft. BKB. RECEIVED This work wi.l], be done :In July/August ].977. JUL - 5 1977 hereby certify tl~at tl~e foregoing Is true arid correct (T his space for St at:,.~e use~./~'._ ~ ~ ~ ~/~t/ -- '~'~~ f~) 't-~. CONOITiO,,,s O APPROVAL. iF Divir,10n o4 Oil and Ga3 DATE See Instructions On Reverse Side Appn:~ed Copy Rel~med BP ALASKA INC. 311 1 - C - STREET · TELEPHONE (907) 279-0644 CONFIDENTIAL State of Alaska Department of Natural Resources Divisionof Oil and Gas Conservation · 3001 Porcupine Drive Anchorage, Alaska 99504 MAILING ADDRESS: P.O. BOX 4-1379 ANCHORAGE, ALASKA 99509 May 13, 1977 Attention: Mr. Hoyle H. Hamilton Director Gentlemen: Well Number BP J-3 (23-04-11-13) Enclosed, in duplicate, is Form P-7, the Completion Report on.the aboVe well, together~with the Well History, Casing Record andSummary of Formation Tests. Verytruly yours, District Drilling Engineer PRJ :j le Enclosures cc: Well File #17 Ms. Regina McGaffigan RECEIVED MAY 1 $1977' SUBMIT IN DUPL! TE* STATE OF ALASKA (See other in- structions on OIL AND GAS CONSERVATION COMMITTEE reverse side) iiiiiii il.il i i WELL COMPLETION OR RECOMPLETION REPORT AND LOG* '" ' oli, ~ ' la. TYPE OF WELL: WELL · WELL DRY Other b. TYPE OF COMPLETION: NEW ~ WORK ~-~ DEEP- [-~ PLUG[--] DIFF. ~] WELL OVER EN BACK EESVR. Other NAME OF OFERATOR BP Alaska Inc. A'~'~RESS OF OPERATOR P. 0. Box 4-1379, Anchorage, Alaska 99509 i. LOC~rION o~ wZL~" (Report location clearl~l and in accordance with any State requirements)* xt,u~ce 1245' WEL, 860' SNL, Sec. 9, TllN, R13E, UPM At top prod. interval reported below Xttotaldep3m597' WEL, 1864' NSL, Sec. 4, TllN, R13E, UPM $. API NUiVIF_J~CAL CODE 50-029-20025 6. LEASE DESIGNatION A_ND SERIAL NO. ADL 28281 7. IF INDIA.N, AI_J.X)TTEE OR TRIBE NA~d~E 8. UNIT,FA/~Vi OR LEASE NA/VIE Put River ~. WELL ~O. ~-~ (~-°4-~-~) 10. F~ ~D P~L, OR ~I~CAT Prudho'e Bay, Prudhoe Oil il. SEC., T., R., M., (BOTTOM HOL~Poo1 OBJECTIVE) Sec. 4, TllN, R13E, UPM 12. PEILVIIT NO. 69-45 3574' WEL, 2214' NSL, Sec. 4, TllN, R13E, UPM 13:DAZSSPUnDmS"-Ii4'DX~"T"~:R~C~ll*"~A~CO'm'SUSPOaAa~VO'll--I~I--6q i 12--31~69 :~ I 4-11-77 '[i~)~VA~ONS(D'F'RKB'RT'GR'~)'llV'~'CASINGHEA~! KBE=57.26' ~SL ~ 35.76' '~S 18. T~ D~H, ~ & TvD~'~ PLUG, ~CK MD & ~. ~ ~L'r~LE CO~L., [ 21. 'INTERVALS DRILLED BY ' ' '[1 ' ~ ' / ~OW ~Y* I ROTA;Y TOOLS ~ CABLE TOOLS 10356 ~-9239 ~D 0249 :~-9140 T~ otal =. ~RO.UCINS m'~'~vmn(s), O* mS COm~'~'~O~--~, ~Om~, ~ {~' A~P ~* =. W~ Dm~O,N~ PrUdhoe .Oil Pool Top 9854' ~ 8753' ~D Subsea ~: Botgom; 10020' ~ 8894' TVD Subsea ~ Yes 2~:w~v~c.rmc ~DOra~ nO~SaU~ FCC/C, ~, CBL DIL/SP'BHCS/OR, LL3; !ML/MLL/C SNP/OR/C CASIIN'G ~llD (Report all strings set tn wtll) CASING SIZE WEIGH~; DEPTH SET (MI)) HOLE SIZE 26. LINER iR~CO~ ~ 28. PERFORATIONS OPF_~ TO PRODU~.-rtON (interval, size and number) 9854' - 9894' 9920' - 9950' 9980' -10020' 0.27" x 440 shots 04 sps ~ 30. PRODUCTION DATE FIRST PI%ODUCTION [ .pRoDucTION MEI'HOD (Flowh~g, gas lift, pumping--size and type of pump) DATE OF TEST, IHOURS TESTED ~[CHOXE SIZE [PROD'N FOR OIL--BBL. GAS--1V~CF. ! t I I F ' ~, ~.~o,l,.o~ o, o,, ~so,~ ,,ed ~o~ t,,,,-n,,~'/,,~ ~' . CI~%Ir~N TIArG RECOi~D 27. TUBING REOOt%D ! AIVIOU/kIT PULLED 2,9. ACID, SIIOT, Fi~P~cTLrlRE, CF_,M~:NT SQUF_3,ZE, ETC. DI~P'TI-I INTI~VA.L (MD) ] A~WlOUNT ~'dXlD KIND O,F 1VIA,T~E:R/AL USagD WELL STATUS (Producing or shut-in) ITEST WITNESSED BY Well History, Casi~~ Record, Summar7 of Formation Tests 33. I hereby certify ~~r~golng ~,~d attac~ormation is complete and correct as determined from alVavailable records SIS~Em ~~~~/ WZTLm District Drilling Engineer ... ~. ~?'~ -~ , ~ *(~e Instructions and S~ces [or Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct Well completion report end log on all types of lan:Js and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- ments given in ether spaces on this form and in any attachme:-~ts. Items 20, and 22:: If this well is completed for separate- production from more than one interval zone (multiple completion), so state in item 20, and in item 22 show the p~cJuci~.g interval, or intervals, top(s), bottom(s) and name (s) (if any) for only the interv~l reported in item 30. Submit a separate report (p~ge) on this form, adequately identified, for each additional interval to be seperately produce,J, show- ing the acklitional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoulJ show the details of ~ny mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a sep,rete completion report on this form for e~ch interval to be separately produced. (See instruction for items 20 and 22 above). "34. !';7!,;IMAIIY OF [~()~MAq'ION TF~q'I'S IN('LUI)IN(; INq'EI~VkI~ T~S'FED. PHESSUIIE DATA ~ ~COVERI~ OF OIL. GAS. 35. G~GIC WAT~ AND MUD See attached sheet BKB Subsea Sag River Sand 9586' 8536 Shublik 9630 ' 8576 Sadlerochit 9726 ' .:4 8656 ~ ii ~ , u : , CASING RECORD ~BP WELL NO.~J-3 (23-04-11-13) Size wt. #/,Ft. Grade Depth Set (MD) Hole Size Cementing Record Amount Pulled 30" Stove Pipe 85' 36" 20" 94/133 H-40 K-55 2071' 26" 16" 65 H-40 2003' 17-1/2" 13-3/8" 61-68 K-55 4447' 17-1/2" 10-3/4" 55.5 N-80 to 2397' 12-1/4" 9-5/8" 47 N-80 10334' 7" 29 N-80 2542' Tubing 4-1/2" 2-7/8" 1287' 1287 ' -9101 ' 150 Sacks Permafrost 4000 sacks Permafrost Uncemented 2500 sacks Class G 1680 sacks Class G 7" Insulated to 2091' Suspended inside 10-3/4" 2542' 1287' 7814' WELL HISTORY BP WELL J-3 (23-04-11-13) DRILLING Cleaned out ice and cement in 30" conductor. Spudded 17-1/2" hole at 1200 hours 11/13/69 and drilled to 2400 feet. Opened hole to 26 inches to 2310 feet. Ran and cemented to the surface a string of 20 inch, 94 lb/ft. H-40 and 133 lb/ft. K-55 at 2071 feet with 4000 sacks permafrost with 0.5% CFR-2. Nippled up well- head and BOP. Directionally drilled 12-1/4" hole to 4480'. Ran Turbodrill to correct course. Reamed to 17-1/2" hole. Ran string of 16 inch 65 lb. H-40 to 2003 feet and hung in wellhead. Ran and cemented a string of 13-3/8" 61 and 68 lb/ft. K-55 casing to 4447 feet with 2500 sacks of Class "G" cement with Gel. Circulated 16 inch and 13-3/8" annuli with diesel from 2049 feet to surface. Nippled up, tested BOP equipment. After'drilling out through shoe, lost 3 cones from bit. While running back in hole-, foundobstruction at 4402 indicating that bottom, joint of casing had fallen. Worked throughtight spot and cleaned hole. Ran Schlumberger CBL and detected~gap in casing from 4401' to 4406'. Spotted 210 sacks densified Class "G"'across interval. Tagged cement at 4385', cleaned out to 4400' with 12-1/4" bit. Ran 8-1/2" bit and cleaned cement to shoe at 4447'. Ran 12-1/4" tapered mill, milled and worked into 13-3/8" shoe joint at'4406', cleaned.out to~4434'. Ran stiff assembly cleanly to 4434'. Ran.12-i/4" bit, cleaned cement 443~4' to 4480' and located junk. Recovered part. of junk with junk basket and~magnet. Ran~.bit with stiff assembly to bottom and found,no signs of further junk. Drilled 12-1/4" hole to 10,356 feet, (9233 ft. TVD). Ran Turbodrill as required to maintain correct direction. Ran SchlumbergerDIL, BHCS-GR, LL3, MLL-ML, FDC-C,~SNP-GR-C, and dipmeter logs. Ran 9-5/8" 47 lb/ft. N-80 and~lO-3/4'' 55.5 lb/ft. N-80 casing to 10,334 feet. Cemented~first stage with 500 sacks Class "G" with Gel and 700 sacks Class "G" with salt. Cemented second stagewith 480 sacks Class "G" with Gel. Displaced 10-3/4"/13-3/8" annulus with Kenpack oil from 2272 feet to surface. Drilled out DV tools and cleaned out.to, baffle at 10,249 feet. RanSperry Sun Gyro survey. Ran Schlumberger CBL log. Set bridge'plug at 2491 feet. Displaced casing with diesel from 2485' to the. surface. Capped wellhea.d and released rig to tear down at 1200hours 1/11/70. TEST COMPLETION July 1970 2O 20-24 24-28 28-31 Rig started completion work at 0600 hours~July 20, 1970. Rigged up. Displaced diesel to brine. Drilled bridge plug. Evacuated 9-5/8" casing to 2500'. Ran 29 lb. N-80 7" casing to 2542'. Casing was insulated to 2091'. Pulled Baker plug. RAn combination string of 2-7/8" - 4-1/2" tubing. Well History (continued) August 1970 1-3 3-12 12-19 19-26 26-31 Perforated the interval 9944' - 9950'. Flowed well. Perforated the interval 9920' - 9944'. Flowed well. Ran production log. Perforated intervals 10,003' - 10,023', 9983' - 10,003'~ Flowed and tested well. Recovered bottom hole samples. Perforated 9857' - 9897', and 9857' - 9897'. Flowed and tested well. Killed well with salt brine. Pulled tubing. September 1970 1-5 Set bridge plug at 9802'. Spotted 100 sack cement plug with 1% calcium chloride. Plug 9700'- ~9478'. Tested plug with 1500 psi. ~ Okay. Ran 2-7/8" Hydril CS and 4-1/2" Hydril A-95 tubing to 9101' (4-1/2" to 1287'). Filled top 20' withdiesel. Nippled.up'Christmas .Tree~and tested. Released:rig to tear downbeat 0300 hours,.September 5, 1970. RECOMPLETION March 1977 Accepted rig at .1800 hours, March 28, 1977. Nippled up BOPE~and.tested. Dis- placed hole to CaC12 at 9075'. Pulled 4-1/2" and 2-7/8" tubing. Speared 7" casing, released from packer. Pulled 60 joints 7" 23#tubing with insulation on outside. April 1977 Drilled out B..,V. at 2271.'. Washed over and recovered packer at 2502'. Cleaned out well to 10250'. Circulated well to CaC12. Set production packer and tail- pipe assembly at 9440'. Ran DST test on packer okay. Ran~236 joints 7" 26# controlled yield N,80 AB-IJ-4S tubing, stabbed intoPBR. Landed tubing 3 ft. from fully inserted position with ball valve at 1984'. Set PN plug in XN nipple. Displaced CaC12 with diesel. Pressure tested. Okay.~ Installed Xmas tree and.lubricator. Pulled blanking sleeve. Hit obstructionat 9455' while trying to recover PNprong. Could not recover prong inseveral attempts. Rigged up Schlumberger. Shot off tailpipe at 9501'. Setinsert sleeve and ballvalve. Nippled down lubricator, installed BPV, master valve. Released rig at 2.400 hours, April 11, 1977. Test Data Interval 1 (9920' - 9950' RTKB) The interval was tested through perforations in 9-5/8" casing. 'The following pressure data was obtained at 9325' RTKB during testing. BHCIP WHFP BHFP Flow Rate psig - psi~ psig B/D 4201 495 2388 c. 9800 Oil gravity was 26.2°API. Interval 2 (9920' - 9950'; 9980'' -..10,020' RTKB) The following pressure data was obtained at 9320' RTKB. BHCIP WHFP BHFP Flow Rate ~ psig psig Psig' B/D 4204 700 3472 c. 18,200 Oil gravity was 26.0°API. Interval 3 (9854' -9894'; 9920' -9950'; 9980' - 10,.Q.20' RTKB). · The following pressure data was obtained at 9325' RTKB. BHCIP WHFP BHFP Flow Rate ~ p_si~ psis B/D 4206 755 3655 '%~ c. 20,900 Oil gravity was 26.0°API. BP ALASKA INC. 3111 - C - STREET · TELEPHONE {907) 279-0644 CONFIDENTIAL State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 MAILING ADDRESS: P.O. BOX 4-1379 ANCHORAGE. ALASKA 99509 April 29, 1977 -~ .... ~v ..... J'--i I ssc t CONFER: Attention: Mr. Hoyle H. Hamilton Director Gentlemen: Well Number BP J-3 (22-04-11-13) Enclosed, in duplicate, is Form F-4, Monthly Report of Drilling and Workover Operations for the above described..well for the month of April 1977. Very truly yours, ?. R. Judd District Drilling Engineer PRJ:jle Enclosures cc: Well File #17 RECEIVED l"korm No. P--4 ]~-EqZ, 8-1-70 STATE OF( 'ASKA OIL AND GAS CONSERVATION COMMI'i-FEE SUBMI'r IH DUPLICATE NiONTHLY REPORT ©F DRILLING AND WORKOVER OPERATIONS 1. WELL WELL =. ~ o~ o~o~ BP Alaska Inc. ~"'A.D~ss OF OPhiR P. O. Box 4-1379, Anchorage,. Alaska 99509 , At Surface: 1245' WEL, 860' SNL, Sec. 9, TllN, R13E, UPM .-'I N U.'~IERICAJ., CODE 50-029-20025 6 LEASE DESiG~Ai']ON AND SEBIAL NO. ADL 28281 1F INDiA~ ALOI'~E OR TRIBE NAME 8 L~IT FA_I~I OR LEASE NAME Put River 2 WELL .XO ..3[-3 (23_-04-11-.13)... 10 FiFJ~D ~:,~ND POOL. OH WILDCAT P~dhoe Bay, Prudhoe 0il Pool 11 SEC. T.. R.. M. (BO~'OM MO~ o~~ Sec. 4, TllN, R13E, UPM 1~ PI~R2vlIT ~rO 69-45 13. REPORT TOTAL DI~TH AT E&'~D OF MONTH. CHANGES IN HOLE SIZE, CASING AND CL'2VIF, NTINC} JOBS INCLUDING DEPTH SET AND VOLT~ USED. PER,FOP,.ATIONS. TESTS A,N-D PCE_CULTS FISHING JOB~ Jb'TqK L~q HOL~; AND SIDE-i'i-R, ACKED HOLE A2gD ANY OTHER SIGNIFICANT CHANGES IN HOL,~ CONDITIONS April, .1977 Drilled out D.V. at 2271'. Washed over and recovered packer at 2502'. Cleaned out well to 10250'. Circulated well to CaC12. Set production packer and tailpipe assembly at 9440'. Ran DST test on packer okay. Ran 236 joints 7" 26# controlled yield N-80 AB-IJ-4S tubing, stabbed into PBR. Landed tubing 3 ft. from fully inserted position with ball valve at 1984'. Set PN plug in XN nipple. Displaced CaC12 with diesel. Pressure tested okay. Installed Xmas Tree and lubricator. Pulled blanking sleeve. Hit obstruction at 9455' while trying to recover PN prong. Could not recover prong in several attempts. Rigged up Schlumberger. Shot off tailpipe at 9501'. Set insert sleeve and' ball valve. Nippled down lubricator, installed BPV, master valve. Released rig at 2400 hours, April 11, 1977. R£CEIVED MAY 2.1977 · . · NOTE --Report on this form is required for e~ch colsndor ~th% regardless of lhe *lotus of operations, ond must ~ filed l. duplicate with tho otl end gas conaervet/o, commiffee bythe 15ffi of the suec~ding monffi,~le~ Otherwise directed. BP ALASKA INC. CONFIDENTIAL State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 P.O. BOX 4.- 1:3'79 3111 - C - STREET ANCHORAGE. ALASKA 99503 TELEPHONE (907) 279-0644 April 13, 1977 I SEC CONFER: FILE: Attention: Mr. Hoyle H. Hamilton Director Gentlemen: Well Number BPJ'3'(23'04-11-13) Enclosed, in duplicate, is Form P~4,. MOnthly Report of Drillingand Workover Operations for the above described well for the month of March. Very truly yours, BP ALASKA INC. District Drilling Engineer PRJ:jle Enclosure cc: Well File #17 ~$ ~ ~o. p~ STATE OF 1%~L 1~- 1-70 OIL AND GAS CONSERVATION COMMI~EE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. WlI;LL SUBMIT I~ DUPLICA'r'~: :2. NAMI~- OF OP~.ATOR BP Alaska Inc. 3. ADDRESS OF OPIEI:Us.'roR P. O. Box 4-1379, /~mchoral~e, A_laska 99509 4. LOCATION OF WTM At Surface: 1245' WEL, 860' SNL, Sec. 9, TllN, R13E, UPM ~ APl NI.~,'mm~AL bODE' 50-029-20025 6 LE, ASE DESiGA~A?ION A.\°D SE1RIAL NO. ADL 28281 ? IF INDIA~. ALOT IE.,~ OR TRIBE NA~IE 8 ~.'IT F.~/,I/ OR b~.ASE ~;AME Put River 9 \yELL NO J-3 (23-04-11-13) I0 FIMI.D A.ND P(~L. OH %VILDCAT Prudhoe Bay~ Prudhoe 0il Pool n sM, r.. x. ~,~. Cso~o~ Hone Sec. 4, TllN, R13E, UPM 12. PERMIT NO 69-45 "13. I~PORT TOTAL DEPTH AT END OF MONTH. CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET A/kID VOLU1VIE~ USED, PERFORATIONS. TESTS AND IIESULTS FISHING JOB~ Jlo~K IN HOLE AND SIDE-/qlACKED HOLE AND ANY OTBEER SIGNIFICANT CHANGES IN HOLE CONDITIONS March, 1977 Accepted rig at 1800 hours, March 28, 1977. Nippled up BOPE and tested. Displaced hole to CaC12 at 9075'. Pulled 4-1/2" and 2-7/8" tubing. Speared 7" casing, released from packer. Pulled 60 joints 7" 23# tubing with insulation on outside. SmN~D - r. ~. cruaa ,, ~TL~ District Drilling. Engineext~ i i . ~u ..... i m Jiiii n NOTE ~Report on this form is required for .each calendar month; regardless of the Status of operations, and must bo filed 'in duplicate with the oil and gas conservation committee bythe 15th of the suoceedin9 month, u~les8 otherwise directed. BP ALASKA INC. 3111 - C - STREET · TELEPHONE (907) 279-0644 CONFIDENTIAL State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 MAILING ADDRESS: P.O. BOX 4-1379 ANCHORAGE, ALASKA 99509 November 2, 1976 Attention: Mr. Hoyle Hamilton Acting Director Gentlemen: Well Number BP J-3 (23-04-11-13) Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above named well..~ This report contains our proposal to re-enter the above well, to complete the well in preparation for production from the Prudhoe Oil Pool. Very truly yours, SKA INC. P. R. Judd District Drilling Engineer PRJ:jle Enclosures cc: Well File #17 · Form 10-403 REV. 1-10~73 Submit "1 ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT---" for such proposals.) OiL k--I GAS E] WELLL..J WELL OTHER 2. NAME OF OPERATOR BP Alaska Tnc. 3. ADDRESS OF OPERATOR P, 0. Sox 4-1379, Anchorage, Alaska 99509 4. LOCATION OF WELL At surface 1245' WEL, 860' SNL, Sec. 9, TllN, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, et~) KBE 57' AMSL 14. CheCk Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20025 6. LEASE DESIGNATION AND SERIAL NO. ADL 28281 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Put River 9. WELL NO. J-3 (23-04-11-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 4, TllN, R13E, UPM 12. PERMIT NO. 69-45 )oft, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) Complete PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFF I~ REPAIRING WELL FRACTURE TREATMENTH ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiplecompletion on Well ComDletion or RecomPletion Report and L. og form.) 15, DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. We propose to re-enter the above well approximately December 10, 1976, to complete the well in preparation for production from the Pr~oe Oil Pool as per the following program: 1. Remove existing 2-7/8" - 4-1/2" tubing. Clean out cement and bridge plug. . Complete with 7" 26# N-80 tubing and production packer. valve, with dual control lines, will be placed at 2000'+. A subsurface safety 3. Change well over to diesel, install and test Xmas Tree. . Suspend well for perforating, subsequent to rig release. Details of proposed perforations to be submitted by Sundry Notice 'to follow. 16. I hereby certi~correct. SIGNED ~.,., - ,.,~ ~-~,- .~-'~ w -,,- - TITLE ,District Drilling Engineer.., DATE (This space for State office use) CONDITIONS OI;"APPROVAL, IF ANY: See Instructions On Reverse Side Approved Copy Returned BP ALASKA INC. P.O. BOX 4-1379 31 ! ! - C - STREET ANCHORAGE. ALASKA 99503 TELEPHONE (907) 279-0644 July 18, 1972 fl~a~e e~ Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Homer L. Burrell, Director Gentlemen: Alterations to BP Well Records In the process of checking and updating our well records, we have ~ound a numbe'r of discrepancies between figures reported to you and figures in our records. Because of this, we are now submitting changes to be made to your records. The follOWing set of figures shows the depth at which conductor pipe was set. Many of the figures were omitted from Form P-7, Completion Report, submitted to you and a few are corrections: Put River #1 (13-27-11-14) ~Jr3 (23-04-11_-13) (13-10-14) (14-1o-14) (01-10-14) (02-10-14) (11-10-14) (19-10-15B) B-2 (23-32-11-14) A-1 (42-35-11-13) A-2 (41-36-11-13) A-3 (44-27-11-13) A-4 (23-25-11-13) A-5 (43-34-11-13) A-6 (32-26-11-13) N-2 (22-17-11-13) N-3 (33-18-11-13) N-4 (23-07-11-13) N-5 (34-06-11-13) N-6 (34-05-11-13) F-2 (22-11-11-13) F-3 (21-12-11-13) F-4 (12-01-11-13) F-5 (14-36-12-13) F-6 (14-35-12-13) H-1 (41-28-11-13) H-3 (23-22-11-13) H-4 (33-15-11-13) H-5 (12-16-11-13) M-2 (42-12-11-12) M-3 (43-02-11-12) M-4 (22-31-12-13) 77" 70 ' approximately 68' 70 ' approximately 75 ' approximately 75' 73' 107 ' 89 ' , 99' 99' 99' 99' 89 ' 86' 98' 95' 91' 99' 92' 95' 96' 97' 100 ' 103 ' 100 ' 100 ' 99' 99' '97' 97' " JUL 2 7 1972 DIVISION OF OIL AND ~A~ ANCHO%s,O~- State of Alaska -2- July 18, 1972 The 10-3/4" x 9-5/8" crossover should be shown at 2397'. (2403') Well D-4 (23-13-11-13) The 10-3/4" x 9-5/8" crossover was se~ at 2415' the 7" , · casing set at 2500' and the 2-7/8" tubing set at 2148'. (Not given previously.)' Well D-5 (23-24-11-13R) The 10-3/4" x 9-5/8" crossover was set at 2437'. (2442') Well B-2 (23-32-11-14) The following depths were reported in the Well History but not included on the face of the Completion Report form: 30" set at 107' 20" set at 2307' 16" set at 2192' 13-3/8" set at 4545' 10-3/4" x 9-5/8" crossover set at 2376' shoe set at 10,724' Well B-4 (23-29-11-14) Please add to attachment to Completion Report giving casing and cementing details: 7", 29 lb./ft., N-80, seal lock. Bottom of seal assembly at 2467~' Insulated from 57' - 2137'. Not cemented. 2-7/8", 6.4 lb./ft., C.S., Hydril tubing run to 2110'. Well N-4 (23-07-11-13) Please amend depths on Completion Report and Well History as follows: 9-5/8" shoe 9295' (9307') 9-5/8" float collar 9251' (9262') 9-5/8" stage tool 4942' (4962') 13-3/8" crossover 2269 ' (2297') 13-3/8" stage tool 2188' (2200') JUL 2 7 197; DIVISION OF OIL AND GA5 ANCHO'Z~C-~ CORE LABORATORIES, INC. Petroleum Reservoir Engineering DALLAS, TEXAS 75207 December 23, 1970 RESERVOIR FLUID ANALYSIS BP Alaska Inco ~ ~~ toshr~t~ c° P. O. Box 4-CCCI / ~e~y~~ ~z Anchorage, Alask~~~~~ Attention: Mr. Michael Allen Subject: Errata BP 04-11-13 Well AFS 64C Alaska Our File Number: RF L 6658 Gentlemen: A stock tank oi~l ~nal_3_y_si~s was performed using fluid from the subject well, and the report was issued on December 7, 1970. On December 18, 1970 you called and questioned the validity of the specific gravity and API gravity which were reported. These values were remeasured and were found to be consid- erably different from the originally reported valUes. Enclosed are.corrected copies of the report which include the remeasured gravities. We are very sorry for .anyin- convenience this may have caused you. Please do not hesitate to contact us if you have any other questions con- cerning the data. PLM:JB:dl 7 cc. - Addressee Very trulY yours, Core Laboratories, Inc. Reservoir Fluid Ahalysis Po Lo Moses' Manager Method ASTM D- 95 ASTM D- 96 · .ASTM D-93 ASTM D- 92 - IP-143 IP-77 IP-103 ASTM D- 129 ASTM D- 974 ASTM D-482 ASTM D- 97 UOP A-46 ASTM D-445 IP-160 ASTM D-Z87 CORE LABORATORIES, INC. Petroleum Reservoir Engineering DALLAS. TEXAS December Z3, 1970 . Page~ File Well 1 of. 2 ,,,RFL 6658 -- BP 04-11-13 AFS 64C Analysis 6f Stock Tank Oil Sample Test Result Water content, volume percent BS&W content, volume percent Flash point P. Mo, o F. Flash point Co O. C., o Fo Asphaltenes, weight percent Salt content, weight percent · pounds per 1000 Bbls. Hydrogen sulfide content, weight percent Sulfur content, weight percent Acidity, mg KOH per gram Ash content, weight percent Pour point, o F. Paraffin content, weight percent Kinematic viscosity, cst. @ 70° F. cst. @ 100° F. cst. @ 1ZZ° Fo Specific' gravity @ 60/60 ° Fo Gravity, ° AP1 @ 60 ° F. Vanadium content, PPM Nickel content, PPIvi ST Vanadium/nickel ratio Tr~ce 0oZ 3O 45 lo3 0.00256 7.89 .Nil 0.8Z loZ 0.05 Zo4 34.,6 17.0 11o3 0.8973 Z6. Z 47 13 ~o5 CORE LABORATORIES, INC. Petroleum Rese?voir Engineering DALLAS. TEXAS December 23, 1970 ASTM D-86 Distillatien of Stock Tank Oil Sample_ Page Z of. 2 File RFL 6658 Well B P 04-11 - 13 .... AFS 64C Percent IBP 5 10 20 30 37 EP R e cove ry Residue Loss Temperature, o F. 142 214 284 385 509 567 37% 61% z% Core Laboratories, Inc. Reservoir Fluid Analysis P. L. Moses Manager These analyses, opinions or interpretattlons are based on observations and material supplied by the client to whom, and for who~e exclusive and confidential use, BP ALAS I NC TELEPHONE (~7) 277-1422 m_l__2' ~ l--F-2' ~Ro ...... A-05911 Nov~ber 6, 19 70 ..... -' State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Homer L. Burrell, Director Gentlemen: Well J-3 (23-04-11-13) . Enclosed, in duplicate, is Form P-7, the Completion Report on the above well, together with a Diary of Operations and Test Data Sheet, Very truly yours, Operations Manager Enclosures cc: New York ® I-'urm P - 7 I SUBMIT IN DU ~TE* " STATE OF ALASKA ~',~,~.L~%~,,~,," I~. arI n~c~ co~ Glt AND GAS CONSERVATION COMMITTEE j 50-029-20025  . ~ . 16. L~E D~IGNA~O~' ~D S~ NO. WELL ~ ~PLETIO~ OR RECO~PLETIO~ ~PO~ ~~ ~,~ J ~L-28281 la. TYPE OF WELL: ?,~l~ht ~ ~LL '~ DRY ~ O~he~ ' b. TYPE OF COMPLE~ON~ NEW ~ work DEEP- ?~ '~- = 8. UNIT,F~I O~ ~SE NAME EN ~ BACK EESVR. WEI,[, ~. s',~E oF O~TOn Put ~ver BP ~AS~ INC. ~,..:~:, .... ~;;, ~. w~s~o. a..,,~zss o~ OP~,,TO, J-3 (23-04-11-13) P. O. BOX 4-CCC ~orage, ~aska 99503 4. LOC~T~ON OF WELL (Re~ort Ioc~tiom c[~rIp ~nd in ~ccord~ncs wit~ am~ ~ate reguiremsnto)' at~u~ 1245' ~L, 860' S~, Sec. 9, TllN, ~3E, at top p~od. ~t,~,~x ,,~o,t,a b,~o~ 9726' ~ 8692' ~ 3505' ~L, 1899' NSL, Sec. 4, TllN, R13E, ~M Sac. 4, Ti~, R13E, ~M ~t total dep~ 10356' ~ 92~' T~ =. P~IT NO. 3574' ~L, 2214' NSL, Sec. 4, TllN, R13E, ~M 69-45 ~3..~ sP~ ~. ~ ~.~. ~ca~ .... 9-5- susP oa ~. ~v~.~o~ 11-13-69 12-31-69 J 70 ~' CABLE TOOLS T~..= 92~' [ 9471 ~ - cement [ uow~. ~ ~o~,~ ~oo~ Total ~, PRODUCING IN~RVAL(S),~ OF ~IS CO~TIO~TOP, BOSOM, NAME (MD AND ~)* }23. WAS D!RECTIO'N&L ~ SURVEY MADE 9854'-10,020~ ~ Sadleroch2t Sandstone [At t2me of ~ 8753' - 8894* ~D Sub-Sea 10. FL~LD AND POOL, OR WILDCAT Prudhoe Bay Sadlerochit 11. SEC.. T., R.. M., (BOTTOM HOL~ Poc OBJECTIVE) 24: TYPE ELECTRIC AND OTHER LOGS RUN 20", 16" and ]J3-~/8" "~asi~ as lJisted o~ 'pr~. , January 26, 119 70. ' J J ]0-.~//,"-/q-5/2'] 55.5/47 J N80 J10,334" ' 7" ' I 29 i so I25421' 26. LINER SIZE TOP (.-"viD) BOTTO1Vr (MD) Pr. oduction lo~., , CASING RECORD (Report all strings set in well) vi°us Cd/npletion Report dated 'l 'i2¼" J-Y00 sks, G/salt:980 ~s G]gel" "1ns i t d t: 2-'-i' ,, ,, J 27. TUBING R~g, oP~ SCi%E~ (~D) SIZE DEPTH SET (MD) [ PACKER SET (P~D) 1287' None PERFORATIONS OPFAN TO 9854' - 9894' %,I ,~, D 9920' - 9950' 99 80' - 10,020' (interval, size and number) 0.27" x 440 29. ACID, SHOT, ]Ti%ACTLTtlE, CEC~IENT SQUTM ETC. DEPTIi iNTF~VAL (MD) AMOUN£ £~D I'2IND OF ACATEPIAL USED 30. PRODUCTION DATE FIRST PI%ODUCTION I I:~ODUCT1ON MEII{OD (Flowi~:g, g'az lif~, pumping--size and type o£ pump) DATE OF TEST, HOURS TESTED 'JC~-IOXE SIZE JPROD'N FOR OIL---BBL. FI'.OW, TUBING CASING PRESSURE ICALCLrI.~T~ OII-~-.BBL. GAS-J~CF. 31. DISPOSITIONOr'GAS (Sold, used )~r fuel, vented, etc.) IV/ELL STATUS (Producing or 32. LIST OF ATTACHMENTS G,%S--NLCF. WATEIA--BBL. J GAS-OIL IL~_TIO WATER--BBL. IOIL'GRAVITY-AP1 (CORR.) I --- JTEST WITNESSED BY Diary of O~eri/t;&~ T~'st Data 33. I hereby certify, t~/r~/d attached information is complete and correct as determined from all-available records *(See Instructions and Spaces for Additional Data on Reverse Side) General: This form is designed for submitting a complete and correct Well completion report end 'log or~ all types of lands and leases in' Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- merits given in other spaces on this form and in any attachments. Items :20, a,cl :2:2:: If this well is completed for separate production from more than one interval zone (multiple completion), so state in item 20, and in item 22 show the prc. Jucing interval, or intervals, top(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Subn~it a separate report (page) on this form, adequately identified, for each additionel inte~ val to be seperately produced, show- ing the ad~clitional d~ta pertinent to such interval. Item:26: "Sacks Cement": Attached supplemental records for this well should show'the details of any mul- tiple stage cementing and the location of the cementing tool. Item :28: Submit a separate completion report on this form for e-ach interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMM~.R¥ OF FORMATION TESTS I'NCLUDIN(; INTERVAL TESTED. PRESSURE DAT;~ -AND 'RECOVERIES OF OIL, "GAS, ,~ 35, O~IC MAR~ : WA~ AND MUD Production ~ NA~ Inte~al Tested Rate B/D ~FP psig ~I Gravity ,, , ~s. 1. 9920' - 9950' 9800 495 26.2° 2. 9920' - 9950' ) 9980' - 10,020') 18,200 700 26.0° 3. 9854' - 9894' ) 9920' - 9950' ) 20,900 755 26.0° 99 80 ' ~ 10,020 ' ) :' ' ' ~ ~'"' '/'/ , i i ' I ' , Illl I , · .......... ......... Diary of Operations :ul , z9 7,o, 20- 31 Rigged up. Drilled out bridge plug at 2500'. Ran completion tools with packer and safety valve at 2547'. August, 1970 1 - 4 Attempted to perforate with Dresser-Atlas equipment. Failure of magnetic positioning device resulted in unsuccemsful per- foration operations. 5 - 11 Perforated 9920' - 9950' with Schlumberger hyperjet scallop guns. Flow tested well. Ran production logs. 12 - 18 Perforated 9980' - 10,020'. Flow tested well. 20 - 25 Perforated 9854' - 9894'. Flow tested well. Tested operation of ball valve satimfactorily. 25 - 9/5/70 Recovered completion tools. Set cement plug at 9471' - 9700'. Ran tubing to 9101'. Displaced well bore to brine. Suspended operations. Test Data Interval 1 (9920' - 9950' RTKB) The interval was tested through perforations in 9-5/8" casing. The following pressure data was obtained at 9325' RTKB during testing. BHCIP WHFP psig psig 4201 495 Oil gravity was 26.2©API. BHFP Flow Rate psig B/D 2388 c. 9 800 Interval 2 (9920' - 9950'; 9980' - 10~020' RTKB) The following pressure data was obtained at 9320' RTKB. BHCIP WHFP BHFP Flow Rate pSig psig 4204 700 3472 c. 18,200 Oil gravity was 26.0©API. Interval 3 (9854' -9894'; 9920'-9950'.;.. 9980' - !0. , 0_20 '__ RT_KB_)_ The following pressure data was obtained at 9325' RTKB. BHCIP WHFP psig psig 4206 755 Oil gravity was 26.0©API. BHFP Flow Rate 3655 c. 20,900 CORE LABORATORIES, INC. Petroleum Reservoir Engineering DALLAS. TEXAS 75ZO7 November 19, 1970 RESERVOIR FLUID ANALYSIS BP Alaska Inc. P. O. Box 4-CCC Anchorage, Alaska 995O3 Attention- Senior Petroleum Engineer Subject: Reservoir Fluid Study BP 04-11-13 Well AFS 65D Alaska Our File Number: RFL 6691 Gentlemen: DUplicate subsurface fluid sam~31es were collected from the subject well on August.Z~4.~ 19700 The samples were forwarded to our Dallas laboratory for use in a reservoir fluid study, ~ t~e ~esu~s o~ ~s s~ s~e ~ese~e~ o~ · Room-temperature saturation pressure determinations were performed on both samples AFS 65D and AFS 65Eo Sample AFS 65D was found to have a 'bubble point pressure of 3875 psig at 74° .Fo, while Sample AFS 65E was saturated at apressure of 3845 psig at 74° Fo At this point. Sample AFS 65D was selected for us.e in the reservoir fluid study° The saturation pressures of the fluid were found ,to be 3956 psig~ 4140 psig and 4263 psig at 100° Fo, 150° F, and Z00* Fo, respectively° At 100° Fo and 150° Fo the pressure- volume relation tests .were performed to the lowest possible practical pres- When subjected to differential pressure depletion at 200° F. the fluid evolved a total of 722 standard cubic feet of gas per barrel of residual oil at 60° FO The'formation volume factor associated with this test was 1o368 barrels of saturated'fluid per barrel of residual oil. The viscosity test was performed over a wide range of pressures at 200~.F.a. nd the viscosity of the fluid · BP Alaska' In6. ' .BP 04-11-13 Well, AFS 65D .Page Two was found to vary from a minimum of 0.92 centipoise at the saturation pres- sure to a maximum of 3.47 centipoises at atmospheric pressure. Two mUlti-stage separator tests were performed at specified conditions. The data from these tests, including gas-o[1 ratios, stock tank oil gravities and'formation volume factors are presented on page 13 of the report° The hydrocarbon composition of the reservoir fluid sample was measured by means of low temperature, fractional distillation and is given on page 14o It has been a pleasure to perform this reservoir fluid study for Bp Alaska Inc. If we may answer any questions or be of further assistance in any manner, please let us hear from you. Very truly yours, Core Laboratories, Inc° Reservoir Fluid Analysis ?. f'. P. Lo Moses : Manager PLM:J'F:dl 7 cc. - Addressee Company, Well Field CORE LABORATORIES, INC. Petroleum Reservoir Engineering DALLAS, TEXAS BP Alaska !nCo BP 04-11--13~ AFS 65D Page File. Date Sampled August 24, County 1 of 17 RFL 6691 ' 1970 State Alaska FORMATION CHARACTERISTICS Formation Name Date First Well Completed Original Reservoir Pressure Original Produced Gas-Oil Ratio Production Rate Separator Pressure and Temperature Oil Gravity at 60° F. Datum Original Gas Cap WELL CHARACTERISTICS , 19__ PSIG @ Ft. SCF/Bbl BM/Day PSIG .... °F. oAPI Ft. Subsea Elevation Total Depth Producing Interval Tubing Size and Depth Productivity Index Last Reservoir pressure Date Reservoir Temperature Status of Well Pressure Gauge Normal Production Rate Gas-Oil Ratio Separator Pressure and Temperature Base Pressure Well Making Water Ft. Ft. Ft. 431& In. to Ft. Bbl/D/PSI @ , Bbl/Day PSIG @ Ft. , 19.__ 216' OF. @, Flow~.ng .Ft. PSIG, Bbl/Day SCF/Bbl °F. ,,, PSIA % Cut SAMPLING CONDITIONS Sampled at. Status of Well Gas-Oil Ratio Separator Pressure ,and Temperature TUbing Pressure Casing Pressure Core Laboratories Engineer Type Sampler 9800 BRTKB · Ft. Flowin~ at 1430 BOPD _690 PSIG, SCF/Bbl oF. . PSIG PSIG REMARKS. * 'Sampii'ng. pr e s ~ ute. and !:e,.'.m~-z:r..a~',u,r e o ** '9854.-9894, 9~50...9950,~ 9985~100Z0 W Ho,FoPo = i;~O ,=~ ...... p .... g WoHoFo'Io =, I03° Fo CORE LABORATORIES, INC. Petroleum Reservoir Engineering DALLAS. TEXAS Page.. 2 of 17 File. RFL 6691 Well 'B1~ 04-11-13, AFS 65D VOLUMETRIC DATA OF' Reservoir Fluid SAMPLE 1. Saturation pressure (bubble-point pressure) 3956 I V ~100 OF 2. Thermal expansion of saturated oil @ 6000 .PSI --V @ 74 °F = I 3. Compressibility of saturated oil @ reservoir temperature- Vol/Vol/PSI- , PSIG @ 100 1o01251 Ih'om 6000 PSI to 5000 PSI-- 6096 x 10-6 ~°F. From ~00 PSI to 4400 PSI-- 7o 53 x 10,6 ° From 4400 PSI to ... Specific volume at saturation pressure: ft 3/lb 3956PSI-- 8~ 11 x lIO-6 '0°02017 @ 100 Pressure~ PSIS 6000 5500 5000 4700 4400 4300 4200 4100 4000 3956 3874 3792 3710 3628 3273 2633 2162 1753 1432 1134 902 7O8 562 438 340 252 177 120 90 CORE LABORATORIES, INC. Petroleum Reser:,oir Engineering . DALi'AS. TEXAS Page 3 . of 17 File RFL 6691 Well B P 04- 11 - 13, AFS 65D Pressure:Volume Relations of Reservoir Fluid Sample at 100© Fo Relative Volume Specific Volume Ft3/Lb 00 9850 Oo 9884 009919 Oo 9941 Oo 9964 Oo 9972 Oo 9980 Oo 9988 Oo 9996 1 o 0000 1 o 0028 1o0056 1 o 0084 lo 0111 1o 0255 1o 0731 1o 1407 lo 2459 1o3886 106050 108961 202973 2o 8102 3°4698 403882 5°7923 8o0081 '1o 6030 5o2187 0.01987 0001994 Oo 02001 Oo 02005 Oo 02010 '0; 02011 Oo 02013 Oo 02015 Oo 02016 0002017 Oo 02023 Oo 02028 00 02034 0 .i 02039 0o02068 0002164 Oo 02301 Oo 025'13 0o02801 Oo 03237 Oo 03824 0o 04634 OOO5668 0006999 0008851 Oo 11683 Oo 16152 0o 23403 0°3O696 These analyses, opinions or interpretations are based on observations and material supplied by the client to whom,,and for whose exclusive and confidential use, CORE LABORATORIES. INC DALLAS. TEXAS Page __,4.__ of_.l_7._ File RFL 66_9.1 PRESSURE-VOLUME RELATIONS OF RESERVOIR FLUID at 100' F. 4.0 Company_B~ Alaska Ine~ Well BI= 04-11-15,._~_ES 65D Field Formahon County Alaska > >, 2.0 1.0 0.0 0 , 1000 Z000 3000 4000 5000 6000 PRESSURE: POUNDS PER SQUARE INCH GAUGE .. CORE LABORATORIES, INC. Petroleum Reservoir Engineering DALLAS. TEXAS Page 5 of 17 File., RFL 6691 Well B P 0z t_ 11 - 13: AFS 65D VOLUMETRIC DATA OF Reservoir Fluid SAMPLE 1. Saturation pressure (bubble-point pressure) ., 4140 ,, V@ 150 oF 2.Thermal expansion of saturated oil @ 6000 PSI -- V@ 74 OF -- , 3. Compressibility.. of saturated oil @ reservoir temperature' Vol/Vol/PSI' From 6000 .. PSI to 5,5 q,0 PSI = From 5500 PSI to 4700 PSI-- ' From, 4700 PSI to ,4140 PSI-- ,, PSIG @ ~ '1,04061 150 OF. 7o89X 10-6 8o 29 x 10-6 90 11 x 10-6 4. Specific volume at saturation pressure: ft a/lb '0002074 @ 150 oF. Pressure, PSIG 6000 5500 5000 4700 4400 4300 4200 4140 4078 4017 3956 3895 3834 3535 2920 2422 1980 1619 1284 1017 ~797 628 5O3 413 298 212 137 99 CORE LABORA:rORIES, INC. Petroleum Reservoir Engineering DALLAS. TEXAS Page 6 of. File. RFL 6691 17 Well BP 04-11-13, · AFS 65D Pres sure-Volume Relations of Reservoir Fluid Sample at 150° Fo Relative Volume Specific Volume, Ft3/Lb 0,9844 0,9883 0,9924 0,9949 O, 9976 0,9985 0.9994 1,0000 '1,0028 1,0056 1,.0084 1o0112 1,0140 1,0287 1,0765 1,1423 1,2447 1,3838 1,5951 1o8793 2°2720 2,7737 3,3476 3,9980 5,3833 7,5378 1100837 14,6362 0,02042 0,02050 0,02058 0,02063 0,02069 0002071 0,02073 0002074 0,02080 0,02086 '0002091 0002097 :0.02103 0002134 0.02233 'O.02369 0002582 0002870 0,03308 0,03898 0004712 0005753 0,06943 '0.08292 '0.11165 0015633 0°22988 '0.3035~ CORE LABORATORIES, IN(:: PEtroleum Rese~'~.oi~ DALLAS. TEXAS Pc, ge__7 of_l~_ F:le RFL 6691 PRESSURE-VOLUME RELATIONS OF RESERVOIR FLUID at 150 4.0 2.0 1.0 0.0 Compcny _,BP A la_s_k_a_In c, Well BP 04-11-13, AFS 65D Field ,r'o;,,:~cltlcn County Alaska 1000 2000 3000 4000 5000 PRESSURE. POUNDS PER SQUARE INCH GAUGE 6000 CORE LABORATORIES. INC. Petroleum Reservoir Engineering DALLAS. T F__.X AS Page 8 of 17 File, RFL 6691 Well B P 04- 11 - 13.~ AFS 65D VOLUMETRIC DATA OF Reservoir Fluid SAMPLE 1. Saturation pressure (bubble-point pressure) 4Z63 V @ 200 oF 2. Thermal expansion of saturated oil @ 6000 PSI -- V@ 72 OF -- 8. Compressibility of saturated' oil @ reservoir temperature: Vol/Vol/PSI' From 6000 PSI to 5500 PSI-- PSIG @ 1o06950 200 OF. 9o 21 x 10-6 From 5500 PSI to 4700 PSI-- 9o90 x 10-6 From '4v00 PSI to 4263 PSI-- ll~10 × 10-6 4. Specific ,volume at saturation pressure: ft S/lb CORE LABORATORIES, INC. Petroleum Reservoir Engineering . DALLAS, TEXAS 75207 Page 9 of 17 File_ R.FL 6691 Well B P 04- 11 - 13. AFS 65D Reservoir .Fluid_ SAMPLE TABULAR DATA DIFFERENTIAL LIBERATION @ ZOO oF. Pres sure.-Volume Relations .... zoo iRelative Volume of i' Sp': V°i;, and Oas~ V/Vsat ~ Fi3/Lb GAS/OIL RAT,O LIBERATED PER BARREL OF RESIDUAL OIL GAS/OIL RATIO IN SOLUTION PER BARREL OF RESIDUAL OIL RELATIVE OIL VOLUME. V/V. 6000 5500 5000 470o 46O0 4500 4400 430o 4263 4216 4179 4087 3900 3852 3554 3500 3203 3000 2861 2500 2482 2142 2000 1820 :1540 1500 1162 1000 896 0.9827 0,9873 0.9921 0.9951 0.9963 '0.9974 0,9985 0.9996 1,0000 1,0025 1o0044, 1.0092 100217 1.0414 0.02097 0.02107 0002117 0.02124 0.02126 0.02128 0.02131 0.02133 0002134 0.02139 0.02143 0.02154 0002180 0002222 1.0712 0002286 1.1113 0002372 101721 0.02501 102535 0002675 1.3661 0002915 1.5099 0o 03222 1.8282 0°03901 2.2225 0004743 64 130 212 290 368 447 523 722 1. 344 1.350' 1. 357 1.361 1. 362 1.364 '1.365 1.367 1.368 658 10 341 592 lo 315 510 1.283 432 1.253 354 " 1 o 223 275 1.193 19.9 1.163 v -- V(~lume at given pressure va^,.--Volume at saturation pressure and the specified temperature. v, -- Residual oil volume at 14.7 PSI absolute and 60© F. , CORE LABORATORIES, INC. Petroleum Reservoir Engineering DALLAS. TEXAS 75207 Page 10 of 17 File RFL 6691 Well B P 04- 11 - 13,. Reservoir Fluid-SAMPLE TABULAR DATA AFS 65D PRESSURE PSI GAUGE l~res sure.-Volume Relations @ Z00':' F. Relative Volume of I Sp._ Volo , Oil and Gas~ V/V, satI Ft3/Lb DIFFERENTIAL LIBERATION @ 200 °f. GAS/OIL RATIO LIBERATED PER BARREL OF RESIDUAL OIL GAS/OIL RATIO IN SOLUTION PER BARREL OF RESIDUAL OIL RELATIVE OIL VOLUME, V/V. 668 500 · 472 176 0 2o8412 0006063 3o8588 0008235 604 118 1o130 662 60 1.104 722 0 lo 061 @ 60° Fo =1.000 Gravity of residual oil = 260 0° AP1 @ 60 ~ Fo v --- Volume at given pressure v$^,.-- Volume at saturation pressure and the specified temperature. v, -- Residual oil volume at 14.7 PSI absolute and 60° F. CORE LABORATORIES, INC. Petroleum Reservoir Eng;neer;ng DALLAS. TEXAS Page. ~ile Well o Differential Pressure Depletion at 2 0 0 ° F. 11 of 17 RFL 6691 BP 04-11-13, AFS 65D Pressure PSIG Oil Density Gas Gms/Cc Gravity Deviation Factor Z 4263 3900 3500 3000 2500 2000 1500 1000 500 176 0 007508 0°7578 0°7650 007738 0O7824 0.7913 008012 0.8109 008221 0.8307 008462 0o 742 00736 00731 0,725 0.725 0.733 00750 00805 00951 10469 0°939 0.913 0.902 0°896 0.903 0.919 0.940 0.969 0o988' These analyses, oninions or intervretations are based on observations and material supplied by the client to whom, and for whose exclusive and confidential use. CORE LABORATORIES, INc. Petroleum Reservoir Engineering DALLAS. TEXAS Oil Viscosity at 200~ Fo Page 12 of File RFL 6691 17 Wel} BP 04-11-13~ AFS 65D Pressure, PSIG , . 60O0 5700 5400 5100 · 4800 4500 4263 3900 3500 ' 3000 2500 2000 1500 1000 5O0 0 Vis cosi'ty~ Centipoises 1.09 lo06 lo03 1o00 0.97 0o94. 0.92 0097 1. I04 1.13 lo25 lo41 1.62 lo89 2°34 3°47 ~u ......, ........ :-; ...... ;~, ........ *-~;^-= ,,.~ L...~,I nn nh~orvnt,|nns and material sumalied by. the client to whom. and for whose exclusive and confidential use, SEPARATOR PRESSURE. PSI GAUGE CORE LABORATORIES, lNG. Petroleum Reservoir Engineering DALLAS, TEXAS SEPARATOR TESTS OF SEPARATOR TEMPERATURE, o F. GAS/OIL RATIO (1) IGAS/OIL RATIO Page File Well Reservoir Fluid STOCK TANK GRAVITY. APl ~ 60a F. o 13 of, RFL 6691 17 BP 04-11-13, AFS 65D .SAMPLE I ormation olume or Separator Volum'e SPECIFIC GRAVITY OF FLASHED GAS 650 150 518 to 100 150 93 to 0 150 43 650 1Z0 491 to 100 1Z0 100 ~ to 0 1Z0 41 572 99 44 537 105 42 Z7.'3 t ' 1 o 104 Oo 727 1,065 0.89Z 2700 10363 10038 1.381 10353 1.09Z 0.716 1.051 0.859 1.025 1,330 (1) Gas/Oil, Ratio in cubic feet of gas @ 60° Fo and 14.7 PSI absolute per 'barrel of oil indicated pres sure and temperature° Gas/Oil Ratio in cubic feet of gas @ 60° Fo and 14o7 PSI absolute per barrel of stc tank oil, @ 60© Fo (3) Formation Volume factor is barrels of saturated oil @ 4Z63 PSI gauge and Z00° F per barrel of stock tank oil @ 60© Fo (4) .Separator Volume' Factor is barrels of oil @ indicated pressure and temperature barrel of stock tank oil @ 60° Fo .. These analyses, opinions or interpretations are based on observations and material supplied by the client to whom and for whose exc!,uslve trod confidential uBe. Company. Well Field CORE LABORATORIES, INC. Petroleum Reservoir Engineering DALLAS. TEXAS BP Alaska Inc. Fomation BP 04-11-13~ AFS 65D County State Page File 14 of RFL 6691 17 Alaska HYDROCARBON ANALYSIS OF CUM PON ENT MOL WEIGHT ' PER CENT PER CENT Reservoir Fluid DENSITY (~ 60e F. GRAMS PER CUBIC CENTIMETER ,SAMPLE APl MOLECULAR 60° F. WEIGHT Hydrogen Sulfide Carbon Dioxide Nitrogen Methane Ethane Propane iso-Butane n-Butane iso-Pentane n-Pentane Hexanes Heptanes plus 5.9O 2.28 0.26 O. O6 45.49 6.39 4.12 1.09 3.03 1.19 0.55 0~ 28 0.95 0.48 0.66 0o42 0.76 0.48 1.34 1.01 '36.94 86.32 100. O0 100.00 0. 9029 25.1 267 Core Laboratories, Inc. Reservoir Fluid Analysis P. Lo Moses Manager CORE LABORATORIES, INC. DALLAS. TEXAS Page 15 of 17 File RFL 6691 PRESSURE-VOLUME RELATIONS OF RESERVOIR FLUID at ~-00 Z.0 1.0 0.0 Core.ny BP A_l_a_s_.__k._a _~_c.,__ Format;on Well BP 04-11-13, AFS 65D County__ Field State Alaska 0 1000 2000 3000 4000 5000 6000 PBESSU~i.:, POUNDS PER SQUARE INCH GAUGE 8OO CompQny V~el] Field CORE LABORATORIES. INC. Page Petroleum Rese,voir Engineerin~ File D/~LLAS. ~EXAS 16 ot 17 RFL 6691 DIFFERENTIAL VAPORIZATION OF RESERVOIR FLUID at 200' F. BP Alaska In¢, BP 04-11-13, AFS 65D Formation County State Alaska 1.40 700 1.35 600 1.30 500 400 300 1.Z5 1.20 1.15 ZOO 1.10 100 1.05, 0 0 1000 Z000 3000 4000 5000 6000 1,00 PRESSURE: POUNDS PER SQUARE INCH GAUGE 4.0 CORE LABORATORIES, INC. Page_ l'e~,o[c,~m R~,','~o,, £ngin~cn.~: File DALLAS. 'TEXAS VISCOSITY ©F R£SERVOIH FLUID At ~..00' F. 17 of 17 AFL 6691 Well BP 04-11-13, AFS 65D Field Formation County State Alaska Z. 5 Z.0 1,5 1.0 0.5 0.0 1000 Z000 3000 4000 PRESSURE. POUNDS I~ER SQUARE INCH GAUGE . 5000 6000 .. . / CORE LABORATORiEs, INC. Petroleum Reservoir Engineering DA LI--~$. TEXAS November 16, 1970 Page 1 of 2 File RFL 6690 Company BP Alaska Inc. Well B P 04- 1,.,1 - 1 ~ Field Formation County State A la s.ka HYDROCARBON ANALYSIS OF Separator COMPONENT I MOL PER CENT [ GAS SAMPLE GPM Hydrogen Sulfide Carbon Dioxide 9.33 Nitrogen 0.59 Methane 77.27 Ethane 7.05 Propane 3.52 iso-Butane 0.44 n-Butane 0.97 iso-Pentane 0.20, n-Pentane 0.24 Hexanes 0.14 Heptanes plus 0.25 100.00 · O. O. O. 0. 0o O. 0o 30 776 966 142~ 305 073 08'7 057 113 521 Calculated gas gravity ( air = 1.000) = 0. 754 Calculated gross heating value = 1078 BTU per cubic foot of dry gas at 14.696 psia at 60° F. Collected. at 125 psigand 94 o F. on August 249 Sample AFS ,63D 1 9'70. These -nalyses,*opinions or intet~retation~ are based on observations and material supplied by the client to whom, and for whose exclusive and.eonfidentli~l use, "~ this report is made. "/'he interpretations or opinions expressed .represent the l~st ~udgment of Core I.~boratories, Inc. .(all errors and'omissions' exe~.nt.~d~.- Core Laboratories, Inc. and its officers and employees, assum~ nn ~,,~,,~,,;k;n+ ..... ~ -.~, .............. ~.: .... : ~ ..... Company. Well Field CORE LABORATORIES, INC. Petroleum Reservoir Engineering DALLAS, TEXAS November 16, 1970 BP Alaska Inc.. Formation ]BP 04-.11-13 County State . Alaska Page File Z of. 2 RFL 6690 HYDROCARBON ANALYSIS OF, COMPONENT MOL WEIGHT ' PER CENT PER CENT Separator DE;:NSITY (~ 60e F. GRAMS PER CUBIC CENTIMETER SAMPLE, · APl I MOLECULAR {~ 60° F.I WEIGHT Hydrogen Sulfide Carbon Dioxide 0.81 Nitrogen 0.0 6 Methane 3.17 Ethane ' 1 o 63 Propane Z. 46 iso-Butane 0.65 n-Butane 20 24 iso-Pentane 1.00 n-Pentane 1.57 Hexanes 2.76 Heptanes plus 83.65 100.00 9 0.16 0.01 0.2Z 0. Zl 0.47 0.17 0.57 0.32 0.49 1.04 6.34 0.00 0. 9017 2503 263 Collected at 125 psig and 94° F. on August 24, 1970. .Sample AFS 6ZC Core Laboratories, Inco Reservoir Fluid Analysis Po L. Moses Manager *Phase analyses, ol~lnlons or Interpretations are ba~:~l' on observations and material supplied by. the client to whom, and for whose exclusive and conflder~tlal l~rm No. P--4 R~V. STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUBMIT 1~ DUPLICATE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. WELL WELL OTHER ~.'~--NA_ME OF OPERATOR BP Alas_k_a__I_n .c_.. 3. ADDRESS OF OP~TOR P. 0. Box 4-CCC, Anchorage, Alaska 99503 ~ WELL At surface: 1245' WEL, 860' SNL, Sec. 9, TllN, R13E, UPM AP1 NI/~IERICAL CODE 50 - 029 - 20025 6. LEASE DESiG~A~ON AND S~IAL NO. ADL - 28281 IF INDIAN, ALOTTEE OR TRIBE NAME 8. L.~IT,F-~RA{ OR LEASE N.kME Put River g. WELL NO. J-3 (23-04-11-13) ~ AND POOL. OR WILDCAT Prudhoe Bay Sadlerochit 0il Pool ll. SEC.,T.,R.,M..(BO~OMHOLE oaJ~r~ N Sec. 4, Tll , R13E, UPM 12, pER1VIIT NO. 69-45 13. REPORT TOTAL DEPTH AT END OF MONTH, CI-IANGES IN HOLE SIZE, CASING A1WD CEMENTING JOBS INCLUDING DEPTH SET AND VOLUATES USED, pERFOI~ATIONS. TF. STS AND RESULTS. FISHING JOB~, JLrNK IN HOLE A_ND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGF~ IN HOLI~ CONDITIONS. CONFIDENTIAL September, 1-5 1970 Set bridge plug at 9802'. Spotted 100 sack cement plug with 1% calcium chloride. Plug 9700' - 9478'. Tested plug with 1500 psi. Okay. Ran 2-7/8" Hydril CS and 4½" Hydril A-95 tubing to 9101 (4½" to 1287'). Filled top 20' with diesel. Nippled up Christmas tree and tested. Released rig to tear down @ 0300 hours, September 5, 1970. ~ ^ ' 'er 7 1970 ..... _~'/f/ /~'J--~o /~"~ 0 erations Mana er ~ATE UC~Omer ~ ------ SIGNED ~ NOTE--Report on this f is required for each calendar month regardless of the status of operations, an~ must be filed in duplicate with the Division of Mines & Minerals by the 15th of the succeeding mo nth~ unless otherwise directed. BP ALASKA INC. P.O. BOX 4-CCC 121 WEST FIREWEED LANE, SUITE 205 ANCHORAGE, ALASKA 99503 TELEPHONE {907) 277-1422 A-04955 September 10, 1970 State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Homer L. Burrell, Director Gentlemen: Monthly Reports Enclosed are monthly reports for the month of August 1970 for our wells J-3 (23-04-11-13), D-5 (23-24-11-13R) and B-4 (23-29-11-14), as well as a report for the month of July 1970 on our well J-3 (23-04-11-13). c. o~o~. I ENG~ ~_ 3 ENG- 4 ENG ... 5 ENG _. 3 GEOL ~ R~V D~AFT CONF,2: ~ILE: gk Enclosures cc' New York Very truly yours, BP ALAS~/~.// Operations Manager RECEJV. O SEP 1 1 I970 DIVISION OF OIL AMD GAS ANCHORAGE ~,,=, No. P~ STATE OF ALASKA suBMrr ~ D~rPUC~= P~-'~. g-3~.6'/ 5. A]PI NU~E~tC~ CODE OIL AND GAS CONSERVATION COMMITI'EE 50-029-20025 MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 2. NA.ME OF OP]~%ATOR BP AI~$Ir~ INC. 6. LEASE DESiGNA ~--ION AXD SE1KIAL NO. ADL-28281 L~,'IT,F.~R~ OR LEASE 14.~ME Put River , 3. ADDRESS OF OP~ATOR P. O. Box 4-CCC Anchorage, Alaska 99503 LOCATION OF WgLL At surface: 1245' 'WEL, 860' SNL, Sec. 9, TllN, Ri3E, UPM 9. IVELL NO. J-3 (23-04-11-13) 10. F!E!~D AND POOL, OR %VILDCAT Prudhoe Bay Sadlerochit Oil Pool 11. SEC., T., R., M., (BOq~TOM HOLE o~mcrivF3 Sec. 4, TllN, Ri3E' UPM 12, PI~R2dlT NO. 69-45 13. REPORT TOTAL DEPTH AT END OF MONTH, CI-IA,NG~.S IN HOLE SIZE, CASING AND CENiENTING JOBS INCLUDING DEPTH SET A/kr~ VOLU/VIES USED, PERFOR3kTIONS, TESTS AND RESULTS. FISHING JOBS, JUNK I/~ HOLE A-ND SIDE-TIR~CKED HOLE A. ND ANY OTHER SIGNIFICANT CI-IANG~ IN HOL~ CONDITIONS. August 1970 1-3 3-12 12-19 19-'26 26-31 CONFIDENTIAL Perforated. the :interval 9944 '-9950.'. Flowed well. Perforated the interval 99201'-99144' . Flowed well. Pan' production log, Perforated ~ intervals 10 '003 '-10 ,i0~3', 9'9 83 '-10,003 '. Flowed:and tested well. Reco~ere~' bottom'hole samples. Perforated '9857''9897', and '9857'-'9897'. Flowed and tested well. '. Killed well with salt 'brine. Pulled ~tubing. R EC E !V.E... O SEP 1 1 1970 DI¥1$1ON (~F OIL AND GAS ANCHORAGE ,mNm:~ /~/~;~~- _.---- ,...-. .... ~',~ Operations ManaRer ..:'~ September 8 19 70 NOTE--~'e~ort?on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. No. ~-~-~ STATE OF ALAS~ Oil AND GAS CONSERVATION COMMI'I-I'EE SUBMIT IN DUPLICATE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. OIL ~'j G~.S [] · rKLL ~LL OTlq r-R 2. NAME OF OPIglR2kTOR BP ALASKA INC. ~. ADDR~S OF OPhiR P. O. Box 4-CCC ~nchorage, Alaska 99503 4. ~CA~ON &F W~ At surface: 1245' W-EL, 860' SNL, Sec. 9, TllN, RI3E' .UPM API NUAiERICA.L CODE 50-029-20025 6. LEASE DESIGNATION AND SERIAL biO. APL - '28281 7. IF INDIA]~, ALOTTEE OR TRIBE NAME 8.L~IT,F.~RA{ OR LEASE Put River 9. ~,VELL NO. J-3 (23-04-11-13) 10, FTR~Y) A_ND POOL. OR WILDCAT Prudhoe Bay Sadlerochit Oil Pool 11. SEC.. T., R., M.. (BO/'rOM HOL~E OB0~CTnrE) .Sec. 4, TllN, R13E, UPM 12. PERMIT NO. 69'-45 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING A/ND CEMENTING JOBS INCLUDING DEPTH SET ~ VOLUATES USED, PERFORATIONS, TESTS A_ND RESULTS. FISHING JOINS. JLrNK IN HOLE A_ND SIDE-T1R~CKED HOLE AND A2qY O~IER SIGNIFICANT CI-IA/~G~ IN HOL~ CONDITIONS. JUly 1970 20 20-24~ 24'28. '28~31 CONFIDENTIAL Rig .started completion work @ 0600 hrs. July 20, 1970. Rigged up. Displaced diesel to 'brine. 'Drilled'bridge plug. Evacuated 9-5'/8" casing to :2500'. Ran 29 lb. N-80 7" casing to .'2542'. ' Casing was 'insulated to 2091'. Pulled Baker plug. Ran. combination.string of 2-7/8'"-4-1/2" :tubing. SEP 1 1 !970 DIVISION OF OiL AND GAS ANCHORAO~ ~ Oueration.q Mana_~er nA'r~ September 8. 1970 NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. BP ALASKA iNC. September 1, 1970 State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 P.O. BOX 4-CCC 121 WEST FIREWEED LANE. SUITE 205 ANCHORAGE. ALASKA 99503 TELEPHONE {907) 277-1422 A-04944 I lENa J --] 2 ENO---i ---i ~ ~'N~ I I 4 ~No ! .... .---T-~' ENo ! -- Ii I~_ a-.-..c~!- - __ I ~v I CONFER.: Attention: Mr. Homer L. Burrell, Director Gentlemen: Well BP Pad J-3 (23-04-11-13) Enclosed in triplicate is Form P-3, "Sundry Notices and Reports on Wells", advising of our intention to leave the well as a suspended producer in the condition designated on the report. The operations on this well will supercede those referred to in our Sundry Notice of August 7, 1970. Would you, therefore, please cancel our Sundry Notice of August 7th. Very truly yours, Operations Manager gk Enclosures cc: Operations Coordinator, NY Form P--3 REV. 9-30-69 S~brntt "Intentions" in Triplicate ~ & "Subsequent Reports" in Duplicate,, STATE O,F ALASKA OIL AND GAS CONSERVATION COMMI'FI'EE SUNDRY NOTICES AND REPORTS ON WRL$ (Do not use this form for proposals to drill or to deepen use "APPLICATION 'FOR P'ER~IT-L" '/or such . . AP1 NU1VIF_,R/CA_L CODE 50-029-20025 LEASE DESIGNATION A-ND SERIAL NO. ADL-28281 1. ?.IF IN'DIAN, ALLOTTEE OR TR/BE NA1VLE OIL ~ OAS ~ WrLL WELL OTHER 2. NAME OF OPERATOR 8. UNIT, FA. RM OR LEASE NAME BP ALAS~ INC. Put River 3. ADDRESS OF OPERATOR 9. WI!ILL NO. P. 0. Box 4-CCC, Anchorage, Alaska 99501 Pad J-3 (23-04-11-13) 4. LOCATION OF WELL At surface 1245' WEL,' 860' SNL, Sec. 9, TllN, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc. KBE 57 ft, a.m.s.1. Check Appropriate Box To I,ndkate Nature of NOtice, Re, 14. 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay (Sadlerochit oil pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 4, TllN, R13E, UPM 12. PEI~/VIIT I'~TO, 69 -45 ~ort, or Other Da~a ' NOTICE OF INTENTION TO: TEST WATER SHUT-OFF PULL OR ALTER CASING FRACTURE TREAT MULTIPLE COMPI,ETE SHOOT OR ACIDIZE ABANDONs REPAIR WELL CHANGE PLAN8 ~Other) SUBSEQUENT REPORT OF: WATER SIIUT-OFF ''--I REPAIRING WELL --i FRACTURE TREATMENT j J ALTERING CASING SHOOTING OR ACIDIZINO ~__~ ABANDONMENT· ~__~ (Other) ........ -- (NOTE: Report results of multiple completiou on Well Completion or Recompletion Report and Log form.) t5. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of st~trtlng any proposed work. . Upon completion of our testing program, we now'propose to leave the well as a suspended producer in the following condition, 10-3/4"/9-5/8" casing set at 10,334 ft. 7" O.D. 29 lb/ft. E80 Seal-lock casing latched into an Otis packer at 2542 ft. Insulation carried on the 7" casing to 2091 ft, in an annulus emptied of fluid to 2495 ft. Combination tubing string having: 4-1/2" O.D. 12.75 lb/ft. NS0 Hydril A-95 to approximately 2400 ft. and 2-7./8" O.D. 6.5 lb/ft. N80 Hydril CS and Seal-lock to approximately~9750 ft. An inflatable bridge plug will be set above all perforations at approximately '9800 ft. with a cement plug extending approximately 50 ft. above it. The well will contain inhibited brine above the cement plug. SIGNED (This space for State office~ CO~IT~O~S oF'k~ROVk£ correct IF ANY: ~' TITLE Operations Manager DATE September 1, 1970 See Instructions On Reverse Side Approved Co~- _Returned FORM SA- lB = , ORANDUM TO: ~ Homer L. Burrell Director [HROUGH: 0. K. Gilbreth, Jr Petroleum Engineer £t ?e of aska DEPARTi~fEN~f OF NATb~L&L RESOURCES DIVISION OF OIL AND GAS DATE : SUBJECT: August 11, 1970 Witness BOP Test and Well Test on North Slope British Petroleum's Put River ~A-11-13 and Put River #23-29-11-14 _July.29 at 4:00 P, M. I drove around and looked over lease operations and well location conditions. BP has put up extensive protection systems around all of their pillow tank locations, both at 'the Prudhoe Bay Dock Site and wherever they might be on well pad locations or at the base camp~ This protection consists of approximate 6' post piling every few feet connected with a steel cable at the top. I drove out to the well sites of the BP Put River f/27-11-14 and Put River ~ ~/1-11~12. Both of these locations still have open pits and considerable amounts of location area which has not as yet been cleaned up or leveled. It appeared that the Put River f/I-ii-12, that at sometime the pit berm had br0k~n and allowed = ......... '-".'.':'~.' .... and 'mud t'o "escape down-th~' 'drainage"'dltch for quite a distance, approximately a quarter of a mile on the tundra. It appeared that the oil had been burned and/or · covered where possible and later when I checked with Charlie Wark, he assured me that the Fish and Game man had observed the work when it had been performed and had checked the exten~ of the damage. J~l/_30 at_ 11:00.. A. M.- I had lunch at the BP Base Camp and met Mr. paul Ellis~ the BP Engineer in charge of the test program being conducted on the well on '~Pad J" Put River #4-11-13. I was unaware that this test was to be conducted, but he · informed me that an extensive test having to do with finding the optimum number of casing perforations to be used for various' flow rates would commence sometime the next day. I told him I would probably check in on the status of the test from time to time an~ pick up what information I could. Ju_q~ 31 at 9:00 A. M. I drove to BP's Put River ~/4-!1-i3 Well to check on the progress of the proposed well test, but they were still rigging up for the test and did not expect to begin until sometime that afternoon late. Au_;;U_ St~2. at 9-'_00 A. ~'~. I checked £~:~ at the BP Base C~'~o and ~a!ked with Mr. Charlie Wark, the Lease Sup=riuuendent, ~o fiud ouu about the stat~ of operations of their three wells. He reported ~'~ .... ' ~ on Well ~/4-11-13 at approx~a~eiy 12:00 ~dnigh'~. We discussed a lot of general problems associated ~th =he North Slope operation su~ as cleanup, pit coverage, pe~afrost d~aEe and well conditions. I went with Mr. Robinson who drove me over =o the l,~ciuk Yard- where we su~eyed the d~ged casing that had been pulled from BP Well Put River f/4-1!-12. ~. Robinson also took me over to review and sea ~he instail~tion of the ~.~o pe~afrost test wells ~ere hot oil has been circulcZing do~% 'cna tubing and up the casing ~nulu.s for some time n~ in an a~tempt to study the effects on their casing prpgram.'~; Homer L. Burrell -2- August Ii, 19 70 August 2 at m~: A ~f. I left the Base Ca~p zor BP's "Pad B" Well ~23-29-!i-14 ~.,~]~en I arrived Mr. Buster Dye, the BP drilling representative, was conuv, ancing a ~.;aekly BOP test. The blind ra~s had just been closed and they were attempting to pressure up to 2,000 psi as I arrived. After many attempts a leak in a 2,000 psi 4" valve behind the choke manifold was located. The hydri! was then opened and the pipe rm~s c!osad, and the 5~000 psi pressure nest cormmenced. Multiple leaks were found and pressure would not hold until several connections were tightened and welded on the four-inch flo~,z line from the wellhead to the test mmnifold. Testing of the pipe rams, blind rams and manifold was finally accomplished to a full 5,000 psi at 6:00 P. I~. It was found that the manual adjustable choke on the test manifold z.;as leaking, and that the 4" i~¢ pressure valve do~mstream of the Swaco choke was leaking. The two 4" valves, one manual and one hydraulic on the 4" flow line, ~ere also tested to 5,000 psi. The two floor valves (internal BOP type valve and the ball-type valve) were then pressure tested to 5,000 psi. The kelly was then rigged up for testing and the ball valve on the lo~er end of the kelly held 5~000 psi; however, the kellycock valve itself was found to be leaking severely and had to be replaced. Ail testing was' complete, except for the replacem'lit of the three valves and retesting of the new components, at 7:30 P. M. (See a:tached Field Inspection Report). ju__gust 3 at 9:00 A. M. I filled the front tank with gas and proceeded to the BP test well on Pad "J". They had just completed an unsuccessful perforating run and it appears this testing will be quite extensive and drawn out, as there are some 75 s~eps in the testing program~ Iief= for Deadhorse:~o~'.Check with.~anotBer opera,or at approximately 11:30 A. M. BP ALASKA INC. State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Gentlemen: BP 04-11-13 P.O. BOX 4-CC¢ 121 WEST FIREWEED LANE. SUITE 205 ANCHORAGE, ALASKA 99503 TELEPHONE {907) 277-1422 A-04100 August 7, 1970 Enclosed is your Form P-3 advising of our intention to suspend COI FID ttTIAL .' 'ENG ~ j- ~' r.~,s "' __.~.__ '1 5 ENG 3 GEOL - - .... j DRAFT J SEC FILE: the above well on completion of our testing program. Very truly yours, ,, Operations Manager hw Enclosure RtEC[ VED AUG 1 !. 1970 DIVISION OF O~[ AND GAS ANCHORAGE Form P--3 F~EV. 9-30-69 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATIO.N COMMITTEE SUNDRY NOTICES AND REPORTS OH WELLS (Do not use this form for proposals to drill or to deepen use "APP-LICATION 'FoR ~'ER~r~'-~' '~or such 'pfo~)osals.) · . 1. WELL WELL OTHER 2. NAME OF OPERATOR BP ALASKA INC. 3. ADDRESS OF OPERATOR P. 0. Box 4-CCC, Anchorage, Alaska 99501 4.LOCATION OF WELL At surface 1245' UEL, 860' SNL, Sec 9, TllN, R13E' Ut~ 13. ELEVATIONS (Show whether DF, RT, GR, etc. KBE ;57 .ft. a';m.s.1. ,, Check Appropriate Box To I,ndicate Nature of N~)~tice, Re 5. AP1 N~CAL CODE 50-029-20025 LEASE DESIGNATION AND SERIAL NO. ADL-28281 7. IF II~DIA/~, A_LJ.,O'l-r~g OR TRIBE NA~[E 8. UNIT, FAR~ OR LEASE N~E Pu~ River Pad J-3 (23-04-11-13) 10. F~:'~.~ AND POOL, OR WILDCAT · Prudhoe Bay (Sadlerochit 0il Pool 11. SHC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 4, TllN, R13E, UPM 12. PER/VI. IT 1~O. 69.-45 )o. rt, or Other Data NOTICE OF INTENTION TO: FRACTURE TREAT MULTIPLE COMPI,ETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS ~ Other) Susp end EUBSEQUENT REPORT OF: WATER SItUT-OFF REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZINO ~ ABANDONMEN'T* (Other) (NOTE: Report reaults of multiple completion on Well Completion or Recompletion Report and Log form.) I5. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work, We' Propose. to .leave the'. subject well as a suspended producer, at. the completion of our testing program. The following well data is relevant:- N-80 7" od 29 lb/fi/Seal-Lock casing latched into an Otis packer at 2542 ft. Insulation carried on the 7" casing to 2091 ft., in an annulus emptied to '2495 ft. Combination tubing string having 4½" 'od 12.75 lb/fi NS0 Hydril A-95 to 2509 ft., and 2-7/8" od 6.4 lb/fi NS0 Seal-Lock to 9395 ft., latched into a packer at 2528 ft. Otis ball valve nipple (ball valve "removed) at 2451 ft. Otis tubing plug set at 2418 ft. The 4%" tubing and 7"/4%" annulus will both be effectively packed off and will contain diesel to about 2400 ft. Ail surface valves will be left closed. AUG 1!. !970 certify that gol a e a d co eet SIGNED · .... (Thta space for Stake office~u~ CONDITIONS O~ 'AP~RO~VAL, Ir A~: ~ DIVISION OF OiL AND GAS ANCHORAGI~ TITLE 0Derations Manager DATE ' 8-7-70 TITLE See Instructions On Reverse Side Approved Copy Returned CONFJD , TtAL Jul7 .7, 1970 (JJBP TESTING (PETROLEUM PROGRAM ENGINEERING) This program ±s des±gned primarily to test the completion for production (running techn±que, equipment performance, down hole safety valves and production characteristics). A seer±on of conglomerate w±ll be tested for productivity. A prototype surface safety system will be on site bur may be tested after the rig is released. The refrigeration requirements will not be investigated during this testing program. It is not intended at this time to run any production logs. The well will be left completed as a producer with degassed crude oil in the tubing and annulus. PRESENT STATUS: See accompanying diagram. The fluids in the well at present are diesel from bridge plug (2491') to surface, drilling mud from TD to bridge plug. Mud Wt. 10.6 lb/gal Visc. 53 secs F.L. 4 cc/30 min p.H. 10 XP20/Spers ene mud The CBL recorded on January 9, 1970 shows generally good bonding across the Sadlerochit. RECEIVED PROCEDURE: 1. Drill out the bridge plug at 2491'. 2. Run GR/CBL from TD to 9000'. 1 1 1970 DJ¥1$1ON OF OIL AND GAS ANCHORAGI~ Be. Run in 2-7/8" and 4-1/2" tubing to bottom and clean out. Displace M.I.H. to water. e e Pump upper hole dry. ~~_~ Run 9-5/8" packer on wire line and set at 2520' B.K.B. 6. Run insulated 7" casing and hang. 7. Record Dresser Atlas HRT in 7" casing. 8. Space, tm~d and nipple up 7" casing. 9. Fill 7" with brine and pressure test packer and seals. 10. Run completion string as follows: (Bell Nipple ) (Joint ) 2-7/8" E.U.E. (N Nipple - 2-7/8") X-over 2-7/8" E.U.E./2-7/8" Seal Lock Joint X Nipple ) Seal Lock Perf. Joint ) 2-7/8" Seal Lock tubing X Nipple Joint Flow crossover 4-1/2" Hydril tubing (without nipples) The bell mouth nipple should be at 9400' B.K.B. (approximately) Latch flow crossover into 7" and release 4-1/2" tubing string at tubing seal divider. 12. Pull 4-1/2" tubing. 13. Run 4-1/2" tubing Hydril and twin control lines as follows: Latch in Joint Ball valve nipple with blanking off protective sleeve in place, and connect twin control lines Joint X Nipple, with control line clips Joint 4-1/2" 'XD' S.S. door (Closed) - ensure control lines run across blanked port Tubing to surface and space out and land. 13.A Run PX plug and lock into 2-7/8" profile 1 joint below from crossovers. 14. Test 4-1/2" latch seals and tubing string down 4-1/2"/7" annulus. 15. Change W.H. and pressure test. 15A Pull PX plug. 16. Perforate 1 s.p.f.D.I. Log Interval 9926-9956 ft. BKBo NOTE: Open hole. BHCS/GR log is recorded 2 ft. deep cf. DIL. 17. Flow well to clean up tubing and annulus. 18. Run in RPG4 gauges and suspend between the X and N nipples in the 2-7/8" tubing. 19. Flow tubing at maximum rate for steady ~FP, recording production rate and WHFP. 20. Shut in well and record P.B.U. 21. Record gradient, tag bottom, pull gauges. Check charts for possible gauge vibration effects. 22. Flow annulus at maximum rate. Run perforating gun to 1800 ft. and shut in annulus. Continue on down with gun. 23. Reperforate interval 9926-9956 ft. BKB (1 s.p.f.). 24. Flow tubing at maximum rate to clean up. 25. Run RPG4 gauges and Sperry-Sun and suspend as before. 26. Flow well at 3 rates (1/3, 2/3 and maximum) for about 4 hours per rate, or until steady conditions obtained at surface. 27. Shut in well and record P~.B.u. 28. Pull gauges and check charts. 29. Flow well on annulus to get gun started in again. 30. Perforate 9960-9990' DIL depth (1 spf). 31. Flow at maximum rate for WHFP and production rate. 32. Reperforate 9960-9990' (1 spf). 33. Flow as 34. Reperforate 9960-999'0 (2 spf). 35. Flow as 31. 36. Depending on the production rate at this stage ths intervals below could be perforated. They should be perforated in the order listed, until a steady production rate of 16,000 ~B/D is obtained, with a T.H.F.P. of 1000 psig. The method of perforating will be based on the results of preceding runs. 9838 - 9848' 9808 - 9818' 9990 - 10000' 10020 - 10030' Intervals above 9790 and below 10,050 must NOT be perforated. 37. Run N stop (without packing) and lock into N profile nipple. 38. Run in Sperry Sun and RPG 4 gauges and soft release onto N stop. 39. Flow well at 3 rates (1/3, 2/3 and maximum)-- collect separator oil and gas and stock tank oil samples. 40. Shut in and record PBU.- 41. Immediately the wellhead has been shut in, run a temperature survey on wire line. 42. Pull gauges and check charts. 43. Pull N~stop. 44. Run single RPG 4 (with maximum recording thermometer) and check gradient ~ ~~m of wail. ta~ bottom and oull out. 45. Flow well at low rate and collect 4 B.H. samples. 46. Rerun N stop (without packing). 47. Pull blanking sleeve from ball valve nipple. 48. Run Sperry Sun and PPG 4 gauges and soft release onto N stop. 49. Run 2-7/8" tubing check valve and lock into profile in flow crossover. 50. Run ball valve and lock into nipple. 51. Open and close ball valve several times to check operation. 52. Flow tubing at 3 rates as Step 39. 53. Open SSD and flow annulus and tubing together at 3 rates. 54 Shut in tubing and flow annulus alone at 3 rates - collect c. 20 bbls. of S.T. oil. 55. Shut SSD. 56. Pull ball valve, tubing check valve and gauges. 57. Check charts and rerun 2-7/8" tubing check valve and ball valve (and lock in position). 58. Test 2-7/8" tubing check valve by p'umping the 20 bbls of S.T. oil down annulus~ measuring pumping rate~ pressure, etc. 59. Bleed down annulus pressure and observe annulus C.I.P. 60. Operate ball valve several times to ensure free action - note surface control pressures. 61. With the ball valve closed, bleed down the 4-1/2" tubing pressure and test ball valve shut off and opening ability against maximum differential several times - note surface control pressures and time for ball valve to open, etc. 62. Flow the tubing at several rates (up to maximum), operating the ball valve at each rate. Note surface control pressures. Repeat maximum rate closure test to check consistency of control pressures, effects (if any) on W.H., tubing, seals, etc. 63. Run and lock an X plug into the profile 1 joint above the ball valve, close the Valve, bleed off the gas from annulus and tubing, insert tubing head NRV (H check). 64. Release rig. This program is expected to take approximately 26 days. W. A. DOWNIE NOTE: Steps 14 60 are subject to change at any stage, depending on equipment and well response, but no operation other~than wire line work and perforating is envisaged. 2, 3, The 10-3/4/13-3/8" annulus pressure should be observed periodically throughout the tests. The BHCS/GR Log was recorded 2 ft. deep, compared with the DIL. 4. When the P.E. Well Testing Equipment has been connected up, the Gray Lock/ 4-1/2" I.F. Pin should be blanked off and the system pressure tested to 2500 psi. 5. Prior to testing, the adjustable 4" and 3" choke seats and tips should be inspected, and replaced if necessary. 6. A casing marker joint is positioned 9557 - 9598 ft. BKB. BP ALASKA INC. P.O. BOX 4~CCC 121 WEST FIREWEED LANE, SUITE 205 ANCHORAGE. ALASKA 99503 TELEPHONE {907) 277-1422 A-04070 July 17, 19 70 CONFIDENTIAL -- ENG J :'3 lNG I~,.~ I 5 ENG ---- REV DRAFT I sEC CONFER:-- FILE: State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Homer L. Burrell, Director Gentlemen: Well BP Pad J-3 (23-04-11-13) Enclosed in triplicate is Form P-3, "Sundry Notices and Reports on Wells", advising of our intention to re-enter the above well on or about July 20, 1970 for the purposes designated on the report. hw cc: Operations Coordinator, NY Very truly yours, P. A. Barber Acting Operations Manager Form 1~3 Ri~V. 9-30-67 t ' Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COAAAAII'[EE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen or plug back to a difflerent reservoir. Use "APPLICATION FOR PERMIT--" for such proposals.) 0IL ~ OAS ['-] WELL WELL OTHER 2. NAME OF OPERATOR BP 3. ADDRESS OF OPERATOR P. 0. Box 4-CC¢. Anchora e.~.~_Alaska 99503 4. LOCATION. O,F WELL At surface 1245' WEL, 860' SNL, Section 9, TllN, R13E, UPM 13, ELEVATIONS (Show whether DF, RT, GR, etc. KBE 57 ' AMSL 14. Check Appropriate B~x To I~ndi'c~fe N~ture of N~ofice, Re NOTICE OF INTENTION TO: ~i API NUbiP. LRICAL CODE DESIGNATION A.ND SERIAL NO. ADL~28281 7. IF IiN'DIA.N, ~]KIE OR TRIBE NAiVIE S. UNIT, FAR1VI OR LEASE NAME Put River Pad J-3 (23-04-11-13) 10. FIELD AANI) POOL, OR WILDCAT Prudhoe Bay (Sadlerochit 0il Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJEC'I'IVE) Sec 4, TllN, R13E, UPM 69-45 ~ort, or 'Other 'i~t~ SUBSEQUENT REPORT OF: TEST WATER SHUT-OFF PULL OR ALTER CASINO WATER SItUT-OFF ~--~ REPAIRING WELL SHOOT OR ACIDIZE ABANDON$ SHOOTING OR ,,ACIDIZINO~ ABANDONMENT* REPAIR WELL CHANOE PLANS I (Other) . ' (OCher) Flow .Test (NoT.z: Report results of multiple completion on Well Completion or Recompletion Report and LOg form.) 15, DESCRIBE PROPOSED OR COMPLETED OPERATIONS ~l; state all pertinent details, and give pertinent dates, including estima~.d~ate of starting proposed work, We propose to re-enter the subject well on about July 2.0, 1970 in order to:- a) Install completion equipment including insulatiOn sleeve. b) CarNy out a flow testing program in the Sadlerochit formation. c) Test the downhole tools and surface control equipment. d) Leave the well closed in as a single zone annulus/~,in~,~ producer from the Sadlerochit formation with a surface controlled sa~fety valve installed at approx- imately 2300 ft. During the above operations the well will be equipped either with 12" 3000 psi BOPs or a 13-5/8" 5000 psi production stack. J U L 1 'i 970 DIVISION OF OiL AND GAS SIGNED ~d~//~/~'~ ~ ~-~. ~- r. A. B~ER :- .... -:--'. - ra-ions Mana er DATE July-14 1970 (Thi~ space for State office~) CONDiTiONS OF XPfR~, ~ ~: ~TLE ~ ...... DXTE / ; Approved Cop~ ~ Snstru~ions On Rever~ Side ~turn~, BP ALASKA INC. March 26, 1970 P.O. BOX 4-CCC 121 WEST FIREWEED LANE, SUITE 205 ANCHORAGE, ALASKA 99503 TELEPHONE (907) 277-1422 A-02810 Mr. Thomas R. Marshall Chief Petroleum Geologist Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Marshall: DeViation Surveys - Prudhpe Bay Following our telephone conversation of March 25, 1970, I confirm that BP Alaska Inc. proposes to adopt'the radius of curvature technique in computing deViation surveys. This method will replace the tangential technique previously used. I am enclosing the deviation surveys run on BP 04-11-13, BP 09-11-13 and BP 18-10-15 recalculated using, the radius of curvature technique. Should you have any queries on the foregoing, please do not hesitate to let us know. Yours sincerely, BP ALASKA INC. Technical Manager gk Eric. cc: Operations Manager Senior Technical Advisor Senior Petroleum Engineer Senior Geologist Drilling Superintendent BP ALASKA InC. P.O. BOX 4-CCC 121 WEST FIREWEED LANE, SUITE 205 ANCHORAGE, ALASKA 99503 TELEPHONE (907) 277-1422 tia£ch 26, ~ 70 TO: ~. T.R Harshall Chid Petroleu~ Geologist Divisian o~ Oil ~ Gas 3001 P~c~pi~ ~ive ~chor~e, ~. The following moterial is being submitted herewith. Ple(~se ockn°wledge receipt by signing o copy of this letter ond returning it to this office:- 2 copies: ,~ ~~tioa Sarvey~~t~ on ~~$ oi Carvat~e ~Chod ~ 10-11-15 " - DATE ....... k ............ -. ............................................ 19.Z. .... BP aLaska INC. P. O. BOX 4-CCC 121 WEST FIREWEED LANE:. SUITE 205 ANCHORAGE, ALASKA 99503 TELEPHONE 277-1422 February 2, 1970 A-02362. US 7-2-04-11-13' State of Alaska Department of NaturalResourceS Division of Oil and Gas 3001 PorcupineDrive Anchorage, Alaska 99504 Gentlemen: '~BP '~04,11~13 Enclosed in.duplicate is Form'P-7,',Well CompletionorReCompletion.Report and Log", in connection with the abovewell. Accompanying the completion~fOrmalso is theWell History,.Dual Induction Later°log, Baroid Ppm Log,.Deviation-Survey and~drillcuttings. Verytruly yours, hw gnclosures cc: OperationsCoordinator, NY Operations Manager Form P--.? SUBMIT IN DUPI.ICA?, ... STATE OF ALASKA (See other struct ions on OIL AND GAS CONSERVATION COMMITTEE reve,'se side) i i i .... , WELL COMPLETION OR RECOMPLETION REPORT AND LOG* b. TYPE OF ~OMPLETION: NEW ~--'] WORK ~] DEEP- ~-~ PLUG ~] DIFF. [~ WELL OVER EN . BACK P. ESVR. Other NAME OF 0PI~RATOR BP ALASKA INC.. 3. ADDRESS OF OPERATOR P. O. BOX 4-CCC, Anchorage, Alaska 99503 4. LOCATION OF WELL {Report location clearly and in accordance with any State requirements) At.u~face 1245 WEL, 860 S L.,. Sec 9, TllN, R13E, UPM , At top prod. interval reported bel°w 97.26' MD 8692.' TVD 3505' WEL, 1899' NSL, Sec 4, TllN, R13E, UPM At total deP~356, MD 9233' TVD 3574' WEL, 2214' NSL, sec 4, TllN, R13E, UPM AP1 NU/VI~C~ CODE 50-029-20025 ~.~SE Dm~-ff~i~os A~D S~Rra~ NO. ADL-28281 7. IF INDIAIg, A.I_J_X:)TTEE OR TR/BE NAME 8. UNIT,FA,RaM OR LEASE Put River g. WELL NO. BP 04-11-13 :"~ ' , 10. FIEL~ ~ POOL; OR WILDCAT Prudhoe Bay 11. SEC., T., R., M., (BO~'OM HOLE OB3ECTIVE) Sec 4, TllN, R13E, UPM 12. PERMIT NO. 69-45 ,. . 18. TI~22~L DE]~.~I, ~-1~ TVD~lg. PLUG B~OK MD ' ~__-- 10,33~ / DsP~Baffle 10249 / aow~w, t ~o~,~ ~oo~s _ . _ , c,~ ~ooz, s ., 'l'vo - 9233 ] 'B.P. 2500 ~..PRODUCING INT~VAL(S), O'F ~rs: ~P~TIO~O~, BOSOM ~ (~ A~D ~)* . . ~23.'WAS DIR~O,NAL '; - ' ' ~ SURVE~ ~ADE 24... TYPE ELECTRIC A_ND OTHF-~ I~OGS R~JN . DIL/SP, BHCS/GR, ;'LL3~ ML/MLL/C, SNP/GR/c, FDC/¢, HRD , ,..CASING RECORD (Report all strings set in well) ' 20" [ 94/133 '::. ~I40/K5~[ (~071'~ ] j 16" [ 65 ' "~ ~40 [ ~ 20*f' 13-3/8" [ 0~/68 ~55 [ 4447' 117-1/2" 2500 sks Class G/gel 10-3/4/9-518 55.5/,47:~80 [ 1033q' [12-1/4"1 700 sks G/salt;"'980 sks 26. LINER l~C O1R~ .[ l 28. PERFORATIONS OPeN TO D ' (Intervat, size and number) . HOLE SIZE CF-~IK~TING RECOi~D 26" 4000 sks Permafrost SCREEN (MD) SIZE DEPTH SET (MD) None 29. ACID, S~!OT, FRACTURE, CF~IENT SQUEEZE, ETC. DIe-*TH INTEi~VAL (MD) ] AMOUNT,, ~'~ND KIN~D O,F M~TE~IAL.US~ID [ I AMOUNT PULLED PACKER SET (MD) i ~0. ' PI%ODUCTION DATE FIRST pK~ODUCTION il PRODUCTION ME2IiOD (Flowh*.~, gas li£.t, pumping--size and type of pump):', [ WELL STATUS (Producin~ orshut-in) DATE OF TEST, I~ioUlqS TESTED .' [CItOXE SIZE [PROD'N FOR OIL--BBL. GA~;--MCF. WATER~BBLj [ GAs-orL tL~TIO GAS--I~CF. [WA'TI~BBL' 3 . DISPOSITION OF GAS (Sold, used for fuel, vente'd, etc.) .... ' Induction La~~ omd ppm Log, Devmatmon Survey, Dr~ll Cuttings 33. I hereby cert~y that thV~~/~ched information is complete and correct as determined from all:available records SIGNED lrt / it -- t r~'~/- TITLE . DATE ii *(See Instructions ~n8 S~ces [or Additional Dut~ on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report end log on all types of lands and leases in Alaska. .: Item: 16: Indicate which elevation is Used as reference (Where not otherwise shown) for depth measure- ments given in:other spaces.on this form .and in any attachments. It®ms 20' and 22:: If this well is completed for separatc· production from more than one interval zone (multiple'completion), so state in item:20, and in item 22 show the prc..Jucing interval, or intervals, ~op(s), bottom(s) and name (s) (if any) for 0nly the interval repOrted in item 30. Submit a separate report (page) on this form, adequately identified, for e'ach additional interval to be seperately produced, show- ing the adblitional data pertinent to such't i~teryal~ I~m26.' "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing and the location .of the cementing tool. Item 28: Submit a separate completion report on this form f.or each interval to be separately produc~cl. (See instruction for items 20 and 22 above). 34, SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, P~URE DATA AND RECOVERIES OF OIL'. GAS, ~ ' 35. G]~X)LOG IC M ARK]~ · WA'I"I~ AND MUD : . . . . : : MEAS. DEPTI{ ']~RU~ VEIIT. DEPT]t Nil ' ~ ': -' Top Coal 4600' 4358' : · LOwer Cretaceous · Unconform±ty 7984 ' 7088 . Top 8hublik · -:: i .. Forraat:ion 9629 / /~" : ' . ~" : Top Sadlerochit 9726 36. CORE DATA, ATTACII BRIEF DESCRIPITIONS OF LITHoLoGY, POROSITY. FRACTURES. APPARENT DIPS AND DETEC~I~iD StlOWS · · · . . Nil · ! : ! cO,hrA~' - ' COUNTY / PAR ISIt SURWEL DATA SIIEET NO. / .WELL NO. STATE TOTAL DEPTH /5'.. CAGING" ~IZE/~ 5/~'' FROM STABILIZER TYPE /~A ~-;.~ O.H. TO ' TO 2,~/~' & ~?/-" FROM Z~/~' TO 7~,~ .... "' " ' - SIZE/~:i;"' NO. OF STAB. -~ T~AL DIST. BE~E~ STAB. ~ / REF. PT. ~r41/~i BEARING ~o'~7-~ HOW OBTAINED SURVEY DEPTHS 0 "TO- .~2, ~ z~ ' "0" PT. ~ " ^.u. No.~g/~'- ~_° INST. NO. / RUN NO. £ yIUM CO~)~ ~RO NO. Z Z I C.B. NO., ,MAG: Gg~I/ ,A.U. _ LAST FLASH' SOLENOIDS: G~A. RST FLASH VOLT. W/LOAD .DC -Cg/C~_AC /' ::L.::'-'" FINISH AZ Z'/~' _DRIFT d..: z:.,>z~.~ O START GYRO AZ. I rfp TIME FINAL ORIENT.. FROM / ~-,~/o ._TO '?ILM REF. PT. TO CASE ORI~T, ~5 ~-~,~ TO ... P'.N..AZ / ~F,..o' _ .... AZ CORR., ~o ,,, ,E/W REMARKS IN: RUN OUT RUN Form~, sP-41.3 (Rev. 4) ::',. 2./~ l ~TA~ c_.L:" _ B P.ALASKA,..INC. .... PAGE I NORTH SLOPE ................................................................................ ~ER!I_CAk_SECIION.._.COHPUTED~ ~LONG CLOSURE ALASKA ............... ....................................................... S P_ E R R_.Y_- S UN ..~ W E LL_..._S .UB.V~_E!~.[_N G___C O__N P A.N _.Y ..................................... SU, 3-16549 .......................................... tRUE .......... I.N_._CL iNA T.!.ON .......DIRECT_ION .... DOG-LEG: RECTANGULAR COORD[NATES ~.EAS.U.RED V. EL{T_t. CAi S~.V. EB.I__!~_E~_T_I_C_A_L_ DEPTH ................. DEPTH .................... DEG ....MIN ........................ DEG .................... DEG/..10~ ......... SEC.T ION ..... NORTH .... SOUTH EAST WEST ................ 0 ...................... 0.00 ................. ORIG!N..AT ..... THE...SU_REA, CE ........... _~ ............. 0..00 ...................... 0.00 lO0. 99 99 0 I5 S -! W 0.00 ~ -0.29 -0.43 '0.0-5- ....... · ................. 200 ................. !99.79 ......... Q 10 ............. S ...... 8.. ~ ...................... 0.09 -0.54 ,0_.72 ........................ 70.01 300 ............. 299.99 0 0 S 0 E 0 16 i- -0.54 -0 72 -0.01 400 ............399.99 0 5 N 59 W 0.08 ~ -0.41 -0.64 -0.13 500 ............. 49~.99 ....................0... 0...: ................. N ....... Q..W ......... 0.,.0.8 ....... ~.0.41 ................................ -0.64 -0,13 600 ......... 59_9.99 ........................ 0.15 N 76 E ..7. O. 0.._ ..... ..6__99,..,. 9,_.9.. Q,.-_.2 0 N 19 E 0 · 08 800 ........... 799.99 ................... 0...25 .................... _N.67 _..E ............. 0__, ].__!__: 900 ..............899.9.9 .................. 0 20 ................. N _69 .E .......... 0..08_,~, 1000, ......... 999,99 ...................... 0 -15 ..................... N 83. E z'O'-', ........................... 59 -'0, s4 ........... O',-Se -0.87 -0.q2 0.85 -1.08 -0.14 1.52 -1.27 0.06 2.06 -1.50 O. 11 2.50 1100 .... 1099.99 ............... O_ 5 .............. N .18_W ............ D..27 .... :'..I__, 37 .................. 0..25 ............................. 2.45 ~ .................. 1200, ........ 1199.99 ....................... 0 ..... 15 ............... N 75 W ............. 0,07_ ! ............ 1300. ........ 12.99,99 1399 98 ! ............... i400. .................... 0' !5 N 55 W 0.16 ~ 1600. _1599.98 0 15 S 26 W 0.21 -1.25 0.29 2.31 -1.II 0.37 2~19 -0.69 ............... 0.62 ................................... 1.84 -0.48 0.53 1.41 -0.66 0.14 1.22 17oo ......... i699.98 ................... o.._i5 ................ s .... 6 .W .............. O,Q.~ ...... ~Q.~9.Z ........................... ~_0.28 ......... 1.17 !900 ...... 1899.98 .................... 0 25 ................S...!2_ W .............. 0,1.7 ............71,75 ................................... ,1.43 ._. 1.01 2000, ..... 1999.98 ............... 0 15 .......... S ._ 9 W ............ 0.-!6 .... -2.04 -1.86 0.94 2100 .......... 2099.98 .....................0._20 ................... S._28._E ................0,20 .... -2.61 -2.38 1.21 2200 ...... 2199.97 .............. 0__30 ...............S 31...E .................... 0.,1_6 ............ ~.3,47 ............................. ~3.12 .......... !.66 2300. .2299..97 ........................ 0 30 ........... S .19 E ..................... 0,!_0 ..... -4..28 -3.95 1.95 ..... PUT RIVER 04-,11,13 ....... NORTH SLOPE ALASKA ~; RECORD_OE ..... SURVEY._ .......................... _i.i i'_iii] ~i ii- i~'~_'i~-U'~.-~'--_]]_--i ~'E~ i-l~-~'ii' DEPTH ........... DEPTH ............. DEG __MI.N 2400 ...........2399,96 ................. 0_35 ............... N_49. W 2600. 2598.86 ............ 7 ~0 N 2700 .......... 2697.49 ................... 9 ..... 30 ....... ~_..N_43._W ............ 2,02 ......... 33.!5 23.19 ................................... -23.97 2800 ...........2795.74 ............... 10 .45 ...............N 39 W .......... I .... 4~ ........ 51,80 ............ 37.69 ....................................... -35.70 2900 ..... 2893.17 .................. 13 ...0 ................ N 38..W ................ 2.25 .............74,29 ................ 55.42 ........................ : ..... -49.55 3000 ......... 2989.7l ...................15 .... 0 .................. N 36 ..... W ......... 2.0! ....... 1.00.12 76.35 ............ -64.77 3200 ......... 3179,51 .................... 19 45 ................... N 35 W ................... 2.7~ ....... 1.62.98 .......... 127.69 ............................. -101.33 3300 ........ 32.'/1.05 ............... 23_:.~5 ............... N.._35 ..... W ............~_.,OQ ....... 203.12 160.68~_~:-'"~i'.--~'~iff.i~ff.'~.'~-~i. i" .-124.44 3500.__ 34q5.36 .............. 29 45 .............. N 3.6_.W ................... 2.,05 ........... 299.06 ................238.96 -180.31 3600 ........ 3532.97 ................. 30.. 0 ..................... N 43 W 3,4? 3~8.97 .............. 275.53 .................................. -214.41 3700 ......... 3617.77 ................. ~2. 0 ................. N 44 W ........ 2_,_0~ ...... ~01.81 313.65 ...................................... -251.22 3800 ......... 3701.64 ................. 33. 0 ............N 46 W ................ 1_..4~ .............. ~5.5,9~ ............ 351.48 ...................................... -290.40 ~.C.O..O_, 3~a~ ~_,_~,3 ~ ___ii, _9 .~__~_..c)____.~ ' Q,~51 __ 565 , 56 424 . 38 - 374 , 26 4100. ....... 3950.3~ ................. 34 30 ........ ~ ....... N _49 W .............. 0_,4~ ....... 621,44 ........ 461.54 .................................. -417.00 . ~ 2 o o ,- ~-. i~.._~ o ~'Z "z' ~i._-L'~ZiT-.. ~ ~' '.L-0_'..ii-i]'~i~-~'~._-~'- ~4 ~.--~y~..-___-..-~,4~--jZ-~.i~ ~ ~. 6 ~'--~Y-i]~i~ ~ 9. ~ z--~-~Zil.y~.-L--~-iZ-/-/ily~._~' ii' -~ ~ o. z 9 _ 4300 ......... 4114,17 ............. 35 0 ............. N. 49 .W ............... O..OQ ........... 734.82 ................... 536.80 ................................ -503.58 4400. 41~5.84 ............. 35 15 ....... N 50 W .............. 0.62 ......... 791.39 ............ 573.90 ...................................... -547.79 ............ 4500 ....... 4277_,5.0 .................. 35_.15 ...............N_.50 .W .............. 4600 ....... 4358,40 ................ 36 .... 0 .......... N 49 W'. ........... 0,9.4_ ...... 906.15 ............... 649..56 .......................................... -636.36 ...... 4700. 4438.00 _ 3?' .15 .... N 50 W ............... 1.38 ...... 965.69 ........ 688.47 ...................... -682.73 _. ---ZZ'D-Z q? 2_ .............................................................................................................................................. ~ B P A.LASKA,._ INC,_ ..................................................... ~ PAGE ..... P U T R I V E R 04, 11 =_1_3 ............................................................................................. 5 ................... -.~i~.~J-_~-~O--A_"R~-~ ;-i- ~ 9.69-'.'_-i-'_ s UR v E y D ~ T E ........ NORT!t SLOPE ............................................................................................... .V_ER_T.__ICAL SEC._T_!ON COMPUTED_.ALONG CLOSURE ....... ALASKA ~ . ~ SPERRY-S~N WELL ~RVE~IN~ COMPANY . SU-3-16549 ~ : ............................... TRUE ........... ]..I._NC.LI~ATION ..... DIRECTION _.DOG-LEG.:~ ............................................. R.EC_T..A.NGULAR COORDINATES ..... B EASU.g ED_ V_~._IiCA~ _S..E_VE.~gJ..!Y~ _V_~,g T I C A L ~ ............ DEPTH DEPTH DEG MIN DEG DEG/[O0 SECTION NORTH SOUTH EAST WEST : ................ ~ 80'0'. ......... ;~-16 ~-Bi ............... ~8 ....0 ................... ~--'51 w 0.96 1026.04 727.21 -7~0.50 4900. 5000 · 4595.61 .................. 38_ 0 ...............N 52_W ............. 0.61 ..... i_~086_.18 .................765.12 ........................................ -779. 4674.14 38 !5 N 53 W 0.66 : 1146.40 802.37 -828. -_ 5100. 5200. _5300. 5500, ........ 5.068,94 3_.7__..~5 N 50 W .Q.65 - 1447.92 9_~8_.,..~1 5600. 5147.75 ..38 0 N 49 W 0.66 : i508.66 1039.i0 - ............................. 5700. 5226'8i- ' ................ 37 45 .................... N -49 W .................. 6".-25 ...... : ~-'569.06 ...... -[079','~6 5800, . 5306.41 .................. 37 15 ............. ].__N 47 .W ..................... !.3! ....... 1629.09 ........... 1120.54 5900 ..... 5386.0[ ................ 37 15 .............. N.a8 W ............. Q,60_. I688,97_ ............ 1!61.0.5 4752 67 38 15 N 52 W 0.61 'i 1206.87 840.49 - 48151.47 ..................3'8 ....0 ....................... N .49 W ............... 1.86 '- !267.62 ................ 880.88 ..................................... - 4910.54 ................ 37 45 ............. N. 49 W ................... Q,2_5 .... ]:_!.328702 ............ 921..04 .......................................... - 877.32 923.79 969.99 1017.30 1064.20 1110.66 1246.12 1290.58 1333.57 1375.34 6000. 5466,i~ ....................... 36_45 ................. N Z~8.. W ..............p~.9 ._.1748,16 ............ I201.08 ................................. - 6100, ........ 5547.04 .................... 36. 0 .......... N.47 .W ......... : ..... 0.95___:L .1806.45 ...... 1241.17 ........................................ - 6200. ........ 5628._45 ........... _35 30 ................... N 46__N .................... 0.7~ .... _.._!864..I6 ............... !281-51 ....................................... - 6300 5710,3/ 35 0 N 47 W 0 76 1921- 05 1320 63 - - .................................................................. e ............. ? ....... ' 64.00,._ 5_792.28 35 0 Fi 47 w 0.00 : [.?.Z7..,_93__ _~.~..5_~..74 - 6500._ .... 5874.20 ................. 35 0 ............. N_55 W .............. 1.14 ........... 2_035.03 ........... 1400.30 ...................................... - 6600 .......... 5955~"6'i ............... 35" 30 ..................... -N' -45 'W ............. ~9 2092~'8 5 .......... 1441' 3~- ............................ - 6700. 6036.77 35 45 N 45 W 0.25 2IEl.O1 I482.68 .................................. - ~._~_~_6800. .... ~_~.'.61!8,43-.'~.~'~.~.__~.~_..~.'35 15 .............N. 45~_W ............. _0.49 2208.47 ..... !523-.49 ......................................... - 6900. ........... 620!.,:09 ....................... 34._.15 ............ : ........ N _~6 _W. .......... I. ? !..5___:. 2264.40 i562.58 417. 459. 499. 540. 582. 622 · 66'3.'Z~-7 7000. 6284.96 33 0 N 46 W . 1.25 2318,53 ............ 1600-.42 7100. 6369.76 ............ 32.. 0 ................ N ~7..W ................... !,13 ...... 237~_-08 .......... 1636,56 1'702.65 1741.40 B P ALASKA, ..... INC ...................................................................................................................... PAGE 4 PUT RIVER 04--I1~L3 ...................................................................... =. ..................... JANUARY._.9,_ 1969 ....... SURVEY DATE - N6)RTH SLOPE ............................................................................................................. -! ..... _V.E.RT. ICAL ...... SECT[ON COMPUTED ALONG CLOSURE ALASKA . ............................................... : ...................................... SP ERR Y = SU N _W ELL_SUR.~E_Y_I !N G COMPANY SU-3-16549 RECORD OF_ .............................................. : ..................................................... .... ~u~.v_~Y ........................ . TRUE ................. [ NCL I_N A.T.I ON ....... DIR EC T.ION DOG=_L E~G .................................. RECTANGULAR. COORD INA TE S M.EA SU R EEL-_VE.~LI i.¢..A~L S E.VJER~I2L___VE.~T~CA~ DEP_TH ............. DEPTH ................ DEG _MIN DEG ............. D.EGZ.~O 0 .......... SECTION .... NORTH SOUTH EAST 7400 6629.10 ........... 29 0 ......... N ~ W ............. 1.5~: ......... 2521.~9 .............. !74~.67 -1 778,72 814.34 847.41 7500 ......... 6718.20 ................ 27 .... 0 .................... N_39 W .......... 2 .... Z~ ........... 2566.59 ............. 17.78.95 ............................................ -1 7600 ......... 6807.30 .................... 27 0 ............. N .39_ W .............. O,OQL _2611.98 ......... 1814.23 ................................. -1 7700 ..... 6897.18 ............. 26. .0 ............. N 38 W ................... 1..0~] ....... 2655.80 ....... 1848.78 -1 - 7800"]"~'-6987-25 ................... 25--45 ................. ~ .... 3~--W ............. 0~9'~ ......~6'9-9-'-16 ........ 188'~.9~ ........................................... -1 8000 ......... 7~68o88 ............. 25 ..0 ............... N 35 U .............0,.65i~ ..... 2782.67 1952.09 -2 8100 ............. 7259.32 ..................... 25 15 ............................. N_33_W ............ 0.88 ......... 2825.04 ........ 1987.87 8200 ........7349..77 .............25_ i5 ........ N 32 W 0.42i! 2867 33 2024 04 8300 ....... 7439.84 ............ 25 45 ........... N.30_W ........... 0,.99z ...... 2910,16 2061.67 .. . 8'7'5.98 904.55 931.54 957.07 981.45 005,69 -2028.92 -2051.53 -2073.25 8400. .......... 7529.91 ...................... 25 45 ............... N_.28_.W 0.86~ _2952..71 ............ 2100.03 .......................................... 2'2093.64 ................... 8500 .......... 7620.17 ............. 25 30 ........... ~.N. 29._W .................. 0,49: ....... 2995.03 ............ 2137.68 -2114.52 ........ ............ 8600 .....7710.24 ..............25 45 .................. N 28 W .............0_~9~ ..... 3037.58 ........ 2176.04 -2134.91 ................... 87 O0 "~21-780.0' ~ 9_/~'~i--~i-.i'~.'i..'.2 5' .3'0'' -~-i~-i._.~i~.-i-Nii-2' 7'-' ~i-~-~-~-_-~0..,. A ~"-_~_~ 079.;.6'0-'__. ~_.__.-2214'. 40 ................................. _ 2154,4.6 8900 ....... 7980.25 ....... 26 0 ............... N 26. N ....... 0 ............ - ............... .00 ........ 3164.81 2293 20 2192 89 ............................... ...................... 9000 ....... 8070.32 ................... 25 .... 45 ................... N 26_~ ......... 0,.24 ..... 32e7~0~ ............ 2'332.2.5 ............................................ -2211.94 9100. ...... 8160,77 ..............25 15 .............. N. 25.~ ................ 0..65 .... 3248.31 .............. 2370.91 -2229.96 ............................... ..._ ................. 9200 ........ 8250.65 ............. 26. 0 .............. N 24 N ...............0_,86 .......... .3290.53 ............. 2410.96 -2247.79 .9400 ..... 8426.59 ............... 29 ;0 ........... N 20..~ ............... 2,_66: .....3380,79 ............ 2~99.38 -2282.53 9500.__ 8511.85 .......... ~[ 30 ............ N 18..N ................. 2.24 .......... 3429.36 .......... 2549.07 ..................................... -2298.67 .............................. B P ALASKA, INC. ~UT RIVER 04-11-13 NORTH SLOPE .................................................................................. - VERTICAL SECTION COMPUTED 'ALONG CLOSURE ALASKA ........................... S P E R RY~SUN. W.E.LL__SU R~ E_Y~ I NG... COMP ANY ......................... SU-3-16549 ................................................. R.E C.O R D_..Q F _ S UR_V.E¥. ..... ' 'i" i'"-'.i" .-']'..-'~ ~¥1R"OE-"i'-_-ii]i'i._iNC-L-~' N~T'[-°N-'ii'.'-~)'Z-~ E-CT~Z'-O.'N.i'-' 6-O~'-L;EG ..................................................... -RE'CT ~NG'OLAR COORD INA TE S .... DEPTH .................... DEPTH .................DEG NIH ........ : ............ DEG ............. DEG/~.~O0. ....... SECTION_ ............ NOR.~!i ......... SOUTH ..... EAST . WES~ : 9600 ......... 8.597 34 3~ ~5 N L6 N [.0:7 ~476.89 2598.94 -23~2.97 9700 ...... 8683.06 ...................3~_ 0 ...................... N...]7.N .................. 0.57 ...... 352~.44 ....... 2648.~9 ............ -2328.03 ..... ...................... 9800. ......... 8768.7.7 .............. ]L ._. 0 ..................... N ..... ~8 _~_ .............. 9_..5~ ............ _35.72.~2 ........... 26.97.L7 ......................... -2343.95 : 9900 .......... 885~,~.9 .................. ~ 0 .............. N ~6_u .............. ~,0.~ ...... ]6~9.5~ ........... 27,6.6a ............................ L'~'3-5'8;'¥~ 000 ..........8939.53 .............. 3!_45 .............. N. 16...W ...............0.-_?~ 3667,T2 .......... 2797.26 ..................... -2372.65 100 ........ 9024_.10 ................. 32 .15 ................... N .... 16 _W ..................... 0,4__9. ........ 3716.62 ............. 2848.56 ........................ -2387.35 200 ........ 91.09.13 ..................31 ..45 .............. N. 14_w ............ :_._.!_:_!7 ......... 3764.07 ......... 2899.,62 ....................................... -2400.09 - . THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THE TANGENTIAL OR CHO...RD_.METHO~ .'_.'-':':::-;i::::-H.°~'i"ZFJNTAL--:::D'IS'PLAcEME'.~iT-'::_~..'._.':_.37 64..,..0__7_ ....... _F___EE:_T.-_~::~:~"-iND~'_TH"::_-_::~-_g:-:'-DEG'.- ..'. 3'6._.:MIN': -NEST (TRUE) ............. . .............. .......................... ............................ ......... : ................ : .............. ::::::::::::::::::::::::::::::::::::::::::::::::" SPERRY-SUN WELL SURVEYING COMPANY SURWEL GYRO DATA SHEET OPEN HOLE SIZE IN. FROM COMPANY ,~ P,"" ~ /," ,"- -¢;" ' Y,"~" '~ .,, i?,/f---- DATE /'- ~'-- LEASE ~) ~ ,:'['"/~£','~ ~/~' - //-/-? WELL NO. FIELD SURVEY COUNTY STATE ,,~- CASING SIZE /~ Y"~/ IN FROM O FT. TO 2~ f-/'~ FT. WT. OR i.D. - ~ ' CASING SIZE_ ~ '2/~;~, IN. FROM ~ ~/'~ ~ FT. TO /~,. ~ q~' ~' FT. WT. OR I.D. FT. TO FT. TOTAL DEPTH /~, ,, STABLILIZER TYPE /~/4. 5/<~.,~. ~ SIZE / m ~/~ IN. NO. OF STAB. ~ DIST. BETWEEN STAB. ****************************************************** ***************************., ORIENTATION REF.'PT. £7'~/<'/~ BEARING ~ ~'o~ ,,~" ~ FURNISHED BY ,,~,2~,',.~? CK'D. BRUNTON READINGS WITH __ o __DECL. NO. 1__ __ O__DiST. FROM WELL .FT.; NO. 2 __ __° . DIST. TO NO. 1 FT.; NO. 3 -- o DIST. TO NO. ] CK'D RUN..NO ~ ......... TY~Er __. ' '~... ~FI.:LM GQ,DE.,.:...::.: z. ~¢~ /~ g ,~D GyRO NO. . C.B. NO. ~ .A.U. f~ , o NO. z/~,~ INST. N0._ / ~ P SOLENOIDSG ~a~ A.U. 2_m'~ MAG G ~3 A.U. ~ ~ VOLTAGE w/LOAD DC 7~/~q AC /0[ DC ~.'~J:g~. AC~ CD [ GYRO ORIENT. AZ ~ ~ TILT ~ AZ /c' ~ DRIFT ~,~' ~TILT ~ ~/ ., , ~L~ ~ '. TIME: ORIENT. ~- ~ m ,~ ~J~ ~' ,.m' ~ ~ TO /~;' ~'" TO T.N. AZ FILM ORIENTATION 1~. ~ '~ ............. P.N. AZ ~'~-~ TO Z~"~.. 2.~ S,~ ~,~ TO ..... AZ CORR. CASE ORIENTATION Z .... ' ~ ~~ e/- FILM ORIENT. TIME ........... ,~ _ ,,..,' TIME: CASE ORIENT. TIME' A7 2,7z ~/~/TILT ~d ENDTIME' WIRE LINE USED __ ZERO PT. /('~.:',~ ~ ~ AZ _ TILT DRIFT AZ /~::;'?'"'/z-TILT ~" DRIFT REMARKS: SURVEY PERSONNEL SP 41-3 I'REV. 3) 8/67 :' - :RRY-SUN WELL SURVEYIN COMPANY SURVEY FIELD DATA SHEET NO. JOB NO..5; ,,' ,'/ ,,"5 COMPANY ~.Z,,? ?-' :"-/)':'"'~ ""*. //¢/P'', ' DATE /- ~- '7~0 SURFACE. TIME DEPTH SURFACE TIME SURFACE TIME DEPTHs, ? ~ '~/".~- [~ SURFACE'TIME, SURFACE TIME DEPTH :'" _ SURFACE TIM ........... :::. >i, ¢.C' q q .... : .... ',,Z ~ "' t ...... '.,'' '- C,? , .. ' ...... C? 2. '~ .... ~.': .. ,.~ ..... ,,.~. ' .4;? Q- .,~, ~ ~ .: '.', j '~, ... -. ,, _ ~ .. , . '::':"¢ : ';/,? "' ~.::' ~' 5: '&....-: ." , '.:- , ........ , __ ~ t .., ~_~__,~=~.._ ._ .,.,.','" " '" '"":~' ~ "7 l- 5%:"' . ' :~. c,. /. /:'~ .¢ :/ ~ / & .,: o l : ¢': .:: · ... . ;,...~ ! ~. . 3 ! .... ~ ' ........ , ,, , ' '^ ~' E':'-?-~:: - ~:~'" ,' -- .... , 3"~ ~, ~,~ '"~" ":"'"" .. 4;',:' 2'1..~,'-~'/,'C~ I .......... :, · · ..~ ~ Z- -,, ~,~ ..__Lq&" '~ ~ . ~ o=.~- , . · . .L..f... '. ..: ......... ;-~-..-~--- ".'..:'.. ':'.:"..'."'."" :'" '"?'~:~ .......... 2':: '" :'-T,?: " "'" '" .?,. z ~,~-. L':,T ..... .' ,. Z ~ ~ "'.'"'" ..... tt 3 ' Go Ss. CS' Zo,¢, ~o ,":', F; ' *' ~'' ,. .,. ~, t,,.. .... ~., ~,~ '~ " ....... .' .4 v;":>, ..."~, "' ~ :>Z-.. ~ C~ , ~, , .~. .,. , . , JL / ............... .... , __ ., ~ , . ...... ~ ~ %/-. .... ~ %~_:~_~ ...... z~,4- ¢3~' . ~¢ ~- q~~ ..... ~:' ~& " ~'~-.z,~ .~°° ~ ~ z~:,'. - /,~ ~ :...?.: --3'2;~T-:.;:~ ! ...... '~' .. ~.- /~, ......... ~<=J,.i.3 I ...... -, ~: Z ~::.~:~:9 ..... / ~ ~--. 7 ,a .................... ....... -:'Z '7 7? -~ ":~, ?'~ .I {::-:%Z~:~ ............ : ~, ,, · Z~:5.- 7.5 }go -lo Operator Lease & Well .. BP Oil Corporation Put I~iver BP 04-11-13 ...... ,1,11 , , ,, §pud Date The following ififormation is in the bank file: 1. P-3 Date ..... Di~te in Ban~ 'File ?-4 ~ieport Da, re ___ ~ate ,i,n Bank,, F~il--~ i me Well History Directional Survey .............. ............................................ ~ Electric Log ............................. 6. Lithology or Mud Log ..................... 7. Other Log ..... 8. Field Trip Report, dated Other Blue line ~ Blue tine ~ Sep ia ~j Sep ia ~ ' ) CONFIDENTIAL Form N'o. P--4 Rev. s-~o.67 STATE OF ALASKA SUBMrr I~ DUPLICATE ~. API NUAIERICAL ~ODE OIL AND GAS CONSERVATION COMMITTEE 50-029-20025 MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 2. NAME OF OPEP. ATOR BP ALASKA INC. 3. ADDRESS OF OPERATOR P. 0. Box 4-CCC, Anchorage, .Alaska 99503 4. LOCATION OF WELL At surface: 1245' WEL,' 860' SNL, Section 9, TllN, R13E' LrPM LEASE DESIGNATION AND SE'RIAL NO. ADL'28281 7. IF INDIA]i[ ALOTTEE Olq TRIBE NAME 8. UNIT,FARM OR LEASE NAME Put River g. WELL NO. .BP 04-11-13 10. FIELD A.ND POOL, OR WILDCAT Prudhoe Bay 11. SEC.. T.. R., M.. (BO~I'OM HOLE oB,rF, CTWE) Sec 4, TilN, R13E, D-PM 12, PERMIT N'O. 69'45 13. REPORT TOTAL DEPTH AT END OF MONTH, CH.A~NGES IN HOLE SIZE, CASING A~ CE1VIENTING JOBS INCLUDING DEPTH SET AND VOLUAriES USED, PERFOtL~TIONS, TESTS ANT) RESULTS, FISHING JOBS, JLrNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT ~GES IN HOL~ CONDITIONS. CONFIDENTIAL ,, January 1970 1 - 3 Logging. 4 - 8 Ran 9-5/8" 47# 10-3/4" 55..5# casing to 10,334' DD. Float @ 10,290', baffle @ 10,249', 9-5/8" DV @ 4981', 10-3/'4" DV @ 2272', 9-5/8" x 10-3/4', changeover @ 12397'. First stage 500 sacks Class G w/I0% Gel and 700 sacks .Class G w/18% salt. Second stage 480 sack, s Class G w/10% Gel and 0.5% CFR-2.. Pumped 100 barrels Kenpak in 10-3/4" and 13-3/8"-annuli. - 11 Cleaned out to 10,249'. Ran Sperry-Sun bottom hole location survey. Ran CBL Log. Set 9-5/8" bridge plug @ 2500'. Circulated diesel'from 2'485' to surface. Released rig to tear down @1200 hours 1-11-70. 1970 smmm ., ~.~,////(//~'/~ =~z~ Operations l~ana~er OA~ Februa~ 5 ~ 1970 NOTE--Repo~ ~form is required for each ~lendar month, regardless of the status ~ operations, and mu~ ~ filed in dupli~te with the Division of Mines & Minerals by the 15th of the succeeding month, unless othe~ise dire~ed. BP ALASKA INC. PUT RIVER 04-11-13 API #50-029-20025~ PERMIT #69-45 WELL HISTORY Cleaned out ice and cement in 30" conductor. Spudded 17-1/2" hole at 1200 hours 11/13/69 and drilled to 2400 feet. Opened hole to 26 inches to 2310 feet. Ran and cemented to the surface a string of 20 inch, 94 lb/ft, H-40 and 133 lb/ft. K-55 at 2071 feet with 4000~!.~:~.~ks perma- frost with 0.5% CFR-2. Nippled up wellhead andBOP'. Directionally drilled 12-1/4" hole to 4480. Ran Turbodrill to correct course. Reamed to 17-1/2" hole. Ran string of 16 inch 65 lb. H-40 to 2003 feet and hung in wellhead. Ran and cemented a string of 13-3/8 inch 61 and 68 lb/ft. K-55 casing to 4447 feet with 2500 sacks of Class "G" cement with Gel. Circulated 16~!!inch and 13-3/8 inch annuli with diesel from 2049 feet to surface. Nippled up, tested BOP equipment. After drilling out through shoe, lost 3 cones from bit. While running back in hole, found obstruction at 4402 indicating that bottom joint of casing had fallen. Worked through tight spot and cleaned hole. Ran Schlumberger CBL and detected gap in casing from 4401' to 4406'. Spotted 210 sacks densified Class "G" across interval. Tagged cement at 4385', cleamed out to 4400' with 12-1~4" bit. Ran 8-1/2" bit and cleaned cement to shoe at 4447'. Ran 12-1/4" tapered mill, milled and worked into 13-3/8 shoe joint at 4406', cleaned eut to 4434'. Ran stiff assembly cleanly to 4434. Ran 12-1/4" bit, cleaned cement 4434' to 4480' and located junk. Recovered part of junk with junk basket and magnet. Ran bit with stiff assembly to bottom and found no signs of further junk. Drilled 12-1/4 inch hole to 10,356 feet, (9233 ft. TVD). Ran Turbodrill as required to maintain correct direction. Ran Schlumberger DIL, BHCS-GR, LL3, MLL-ML, FDC-C, SNP-GR-C, and dipmeter logs. Ran 9-5/8 inch 47 lb/ft. N-80 and 10-3/4 inch 55'5 lb/ft. N-80 casing to 10,334 feet. Cemented first stage with 500 sacks Class "G" with Gel and 700 sacks Class "G" with salt. Cemented second stage with 480 sacks Class "G" with Gel. Displaced 10-3/4"/13-3/8" annulus with Kenpack oil from 2272 feet to surface. Drilled out DV tools and cleaned out to baffle at 10,249 feet. Ran Sperry Sun ~rD~}~y. Ran Schlumberger CBL log. Set bridge plug at 2491 feet. Dis- placed casing with diesel from 2485 to the surface. Capped wellhead and released rig to tear down at 1200 hours 1/11/70. Coring Nil Testing Nil Velocity Survey Nil BP 04-11-13 CASING WTfFT GRADE DEPTH (DD) STAGES DV iST STAGE 2ND STAGE 3RD STAGE 30" Stove Pipe 85' 1 -- 150 sks~pe~mmf~0st .... 20" 94/133 H-40 K-55 2071' 1 -- 4000 sks permafrost .... 0.5% CFR-2 16" 65 H-40 2003' .......... 13-3/8" 61 K-55 4447' 2 2049~ 2500 sks Class "G" Diesel -- 68 w/ 4% Gel, 0.5% CFR-2 10-3/4" 55.5 N-80 to 2403' 3 498t' 9-5/8" 47 10334~ 2272' 500 skS Class "G" w/10% Gel, 1% CFR-2 700 sks Class "G" w/18% salt, 1% CFR-2 480 ~ks Class "G" Kenpack oil w/10% Gel, Q.5% CFR-2 BP ALASKA INC. P. O. BOX 4.CCC 121 WEST FIREWEED LANE, SUITE 203 ANCHORAGE, ALASKA 995'03 TELEPHONE 277-1422 January 12, 1970 'CONE DEHTIAL ' A-02044 US 7-2-04-11-13 State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Thomas R. Marshall, Jr. Chief Petroleum Geologist Gentlemen: BP Put River 04-11-13 Enclosed in triplicate is your "SUndrY Notices and Reports on Wells" form, advising of our intention to suspend the above well. Very truly yours, hw Enclosures cc: Operations Coordinator, NY Operations Manager DIVISION OF 011. AI~. GAS STATE OF ALASKA Subm/t "Intentions" in Triplicate & "Subsequent Reports" in Duplicate OIL AND GAS CONSERVATION CO,MMITTEE SUNDRY NOTICES AND REPORTS O,N WELLS (Do not use this form for proposals to drill or to deepen or plug back to a di£fierent reservoir. Use "APPLICATION FOR PEi~VIIT--" for such proposals.) 1. 0IL ~ GAE WELL WELL ~] OTHER 2. NAME OF OPERATOR BP ALASKA INC. 3. ADDRESS OF OPE~IATOB P. 0. BOX 4-CCC, Anchorage, Alaska 99503 4. LOC'ATION O~F W~LL At surface 1245' WEL, 860' SNL, Sec 9, TllN, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc. KBE 56.8' AMSL Check Appropriate Box To I,nd, i'cate NJature of NOtice, Re -~. API NUiVIERICAL CODE 50-029-20025 6. LEASt~, DESIGNATION A_ND SERIAL NO. ADL'28281 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FA1R~ OR LEASE NA1VIE Put River 9. WELL NO. BP 04-11-13 10. FIELD A~ID POOL, OR. WILDCL~T Prudhoe Bay 11. SEC., T., R., M., (BOTTOM OBJECTIVE) Sec 4, TllN, R13E, UPM 12. PER1VIIT NO. 69-45 ~ort, or either 'Data NOTICE OF INTENTION TO: TEET WATER EHUT-OFF ~ FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL .... CHANGE PLANE I~UBSEQUENT REPORT OF: MULTIPLE COMPLETE FRACTURE TREATMENT ALTERING CASING ABANDONs SHOOTING OR ACIDIZING ABANDONME~qTs (Other) (Other) Suspend (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state ale pertinent details, and give pertinent dates, including estimated date of starting any proposed work, . We propose to suspend our subject well pending design of production facilities and downhole completion arrangements. The well status will be as follows:- Total Depth : 10,356 feet in 12-1/4" hole Last Casing : 10-3/4"/9-5/8" N80 Seal Lock set at 10,334 feet Cemented with : 500 sacks Class G/gel and 700 sacks Class. G/salt through shoe ~480 sacks Class G/gel through stage tool at 4981 feet. A bridge plug will be set at approximately 2500 ft. above which the casing will con- tain diesel. The casing will not be perforated. 16. CONDITIONS OF APPROVAL, IF ANY: .. DI¥I$1ON OF OIL AND GAS · Operations Manager DATE DATE January 12, 19 70 See ~nstructions On Reverse Side Approved Copy Returned ~ 1~-/*/- BP ALASka INC. P. O. BOX 4.CCC 121 WEST FIREWEED LANE, SUITE 20~ ANCHORAGE. ALASKA 99503 TELEPHONE ~77-1422 January 7, 1970 A-01648 State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 CONI: OE ITIAL HI.I~ KL¥ Attention: Mr. Thomas R. Marshall, Jr. Chief Petroleum Geologist Gentlemen: Monthly Reports Enclosed in duplicate are Monthly Report Forms (P-4) for the following wells for the month of December, 1969. BP 04-11-13 BP 23-11-13 BP 33-12-13 BP 12-10-14 BP 19-10-15A BP 31-10-16 BP East Ugnu #1 BP ALAS~KA INCi~ Operations Manager HJC:DLR:dg Enclosures cc: Mr. P. Hardwick, NY STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY RE!PORT OF :DRILLING AND WORKOVER OPERATIONS 1. -~. NAME OF OP~%~TOR SUBMIT IN DUPLICATE BP ALASKA INC. ADDRESS OF OP~TOR OTHER P. 0. BOX 4-CCC~.' ANCHOR~GE, ALA.2KA, q95~3 "4. LOCA'FION O'F WTM At Surface 1245' WEL, 860' SNL, Section 9, TllN, R13E, UPM CONfiDE IIAL' AP1 NUA~ERIC~L CODE 50-029-20025 LEASE DESiG~AT/ON AND SERIAL NO. ADL-28281 ?. IF INDIA]~, ALOTTEE OR TRIBE NAME 8. UNIT,F.~ OR LEASE NA~IE Put River 9. wELL .~'0. gp /,~11-13 ]0. FI:ELD A_%TD P~L. OR WILDC&T Prudhoe Bay n, sec., T., ~., M., (gO.OM HO~ Sec 4, TllN, R13E, ~M 12. PER/VIIT NO. 69-45 13. I%EPORT TOTAL D~e, Trl AT END OF MONTH, CHA. NGES IN HOLE SIZE, CASING AND CKNIENTING JOBS INCLUDING DEPTH SET A/kq) VOLUATES USED, PERFORATIONS, T~STS A/ND P~ESULTS. FISHING JO~, JUNK IN HOLE AND SIDE-TEJkCKED HOLE AAVD A.N'Y OTHER SIGNIFICA2qT C~IA/~GES IN HOL~ CON~DITIONS. CONFIDENTIAL December 1-4 Drilled 12 1/4 in. hole to 4480 feet. The hole was opened to 17 1/2 in. and logged. 4-13 A string of 16 in. casing was run to 2003 feet. A string of 13 3/8 in. casing was run and cemented at 4447 feet with 2500 sacks of class "G" with 4% Gel. Circulated 16 in. and 13 3/8 in. annulia with diesel from 2049 feet to surface. Nippled up tested BOP equipment and drilled out. Ran CBL log, found casing parted @ 4401 feet. Squeezed and drilled out. '------ 13-31 Drilled 12 1/4 in hole to 10356 feet. Ran turbo drill as required. TVD 9332 feet, logging. JAN 8 ~~= oA'rr January 7, 1970 NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. i Operations Manager .) BP OIL CORPORATION ANCHORAGE, ALASKA 99503 DATE: Signed: Petroleum Engtneer~ng Department P.E.2/Oec 68 l~rm No, P---4 STATE OF ALASKA SUBMIT IN DUPLICATE OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS AP1 NLrMERICA~ CODE 50-029 -20025 LEASE DESiGi~A ~ION AXD ML~RIAL NC). ADL-28281 1. !T. IF INDIA~T. ALOi lh~. OR TRIBE NAME O,L ~--~ GAS G Wi~LL wELL OTHER 2, NAME OF OPERATOR 8. L.~IT,F.~RA{ OR LEASE NA3~.E BP Alaska Inc. Put R/ver 3. ADDRESS OF OPEI~ATOR 9. %VELL NO P.O. Box 4-CCC, Anchorage, Alaska 99503 BP 4-11-13 10. FIFJLD AND POOL. OR WILDCAT 4.I~)CATION OF %V~tt At surface 1245' WEL, 860' SNL, Sec. 9, TllN,..R13E, UPM Prudhoe Bay SEC., T., R., ~.. mo~o~, HO~ o~ 12. p]~R2VIIT N'O. 69-45 13. REPORT TOTAL DE~TH AT END OF MONTH, CI-IA~NGES IN HOLE SIZE, CASING AND CKMENTING JOBS INCLUDING DEPTH SET AND VOLLVNIES USED, PERFORATIONS, TESTS A/qB EESULTS, FISHING JOB~, JLrNK IN HOLE A_ND SIDE-TRenCHED HOLE ANT) A/~Y OTI{ER SIGNIFICANT CI4_ANGES IN HOL~ CONDITIONS. Novemb er ~ , 1969 7-12 Moved rig from BP 10'-11-13, on teflon skids. Assembled winterization. 13-20 Cleaned out ice and cement from 47' to 70' inside 30" conductor. Spudded '17"1/2" at 1200 hrs Nov,.''13,. '1969. Drilled to 2400. Opened hole with 26" bit to .2310. Conditioned for casing. .21-24 Ran and cemented 20" 94 .%~/ft H40 and r133 ~.~/ft K55 at 2071' with 4000 sks Permafrost with 1% CFR-2 through drill pipe. Nippled up i?B~. Drilled out and cleaned down to 2400'. 25-30 Drilled directionally with .'Turbodrill and 12-1/4 bit to 2618'. Opened hole t© 17-1/2" to 2618'. Changed rotary table. Drilled 17-1/2" to 3540'. Ran turbodrill to correct course. Drilled 52, 12'-1/4" hole. Opened hole to 17-1/2". Drilled 17-1/2" to 3764'. Ran turbodrill to correct course. Drilled 3764' to 3825'. Drilling ahead 12-1/4" at 3842. ~iYI~ION OF OIL AND GAS OAT~ December 12~ 1969 NOTE--Report on thi~-1~"~-~required for each calendar month, regardless of the status of operations, and must be filecl in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. A-01359 US 7-2-04-11-13 BP ALASka iNC. P. O. BOX 4-CCC 121 WEST FIREWEED LANE, SUITE 205 ANCHORAGE. ALASKA 99503 TELEPHONE 277-1422 November 5, 1969 CONfiDENTIAL ?itM ~ Oleg ~ State of Alaska Department of Natural Resources DiVision of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Homer Burrell, Director Gentlemen: Well BP 04-11-13 We write to correct a series of errors which has occurred in well numbering on our drilling pad in Block 02-11-13. Confusion has arisen firstly from our incorrect submission' of a - monthly report for May of this year, describing drilling operations on this pad. The report described operations in Well 03-11-13, but this was inadvertently given as Well 04-11-13. To correct this we now enclose a corrected report and ask you to amend your records. Further, in temporarily suspending operations in Well 03-11-13 we repeated the error. We also now enclose a correct Sundry Notice. It will also be noted that in our letter of May 27, 1969 concerning Wells 03-11-13, 04-11-13 and 10-11-13, because of a typographical error, the location's W-~re described as "1980' WEL"; this should.-read "1980 ' EWL". We now enclose Sundry Notice giving revised geographical forecas~ and casing program for Well 04-11-13. Well 03-11-13 remains suspended with 20" casing cemented at 945'. We regret these errors and trust this may help in correcting your records; in any case, we confirm telephone conversation this morning between Messrs. Burrell and Clarke that we should get together after the Prudhoe Bay Field Rules Hearing and finally straighten out the files on the wells noted above. PAB :hw Enclosures Very truly yours, BP ALASKA INC. OPERATOr. FOI~~ IL ~(~ORPORAT I0N H. ~.~' Clark~, 0Perations Manager Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen or plug back to a difflerent reservoir. Use "APPLICATION FOR PERMIT--" for such propOsals.) 1. WELL WELL OTHER 2. NAME OF OPERATOR BP AL/~I~ INC. 3. ADDRESS OF OPERATOR P.O. BOX 4-CCC, Anchorage, Alaska 99503 4. LOCATION. OF WELL At surface 1245' WEL, 860' SNL, Sec 9, TllN, R13E, UPM Bottom hole: 1980' EWL, 1980' NSL, Sec 4', TllN, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, OR, etc. KBE Approx. 55 ' AI~L 14. CONFIDENTIAL '§. API 1N'Lr~C~L CODE 50-029-20025 6. LEASE DESIGNATION AND SEH32J~ NO. ADL-2 8281 ?. IF INDIA/~, ALL~T*rF.E OR TRIBE NABF~ 8. UNIT, FA_R1VI OR LEASE MA/VIE Put Ri¥¢r 9. WELL NO. BP 04-11-13 10. FIELD A2N'D I:'OOL, OR WILDCAT Prudhoe Bay 11. SEC., T., R., iVi., (BOTTOM OBJECTIVE) Sec 4, TllN, P,13E, UPM 12. P EI~IVII T 69 -45 Check A~propriate Box To I~n=cJi,c~$e Nlature of N~oti'ce, Re, ~ort, or 'Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF [ I PULL OR ALTER CASING FRACTURE TREAT j ] MULTIPLE COMPI,ETE SHOOT OR ACIDIZE ~ ABANDON* REPAIR V,'ELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF: FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other)  NOT~: Report results of multiple completion on Well ompletion or Recompletion Report and Log form,) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an}' proposed work. PLEASE SEE ATTACHED LETTER. This is a notice advising of amendments .to Permit No. 69-45 Size of Hole Size of Casing Wt. per Foot Grade Settin~ Depth Quantity of Cement 36 30 Stove pipe 80 80 26 20 133/94 K55/H40 2200 2200 16 65 H40 2100 2100 17-1/2 13-3/8 68 & 61 K55 4500 4000 12-1/4 10-3/4/9-5/8 55.5/47 N80 10100 9230 400 sx Permafrost cement 4000 sx Permafrost " Uncemented inside 20" casing 3000 sx Class G in stages 1500 sx G/salt; 800 sx G/gel 16. I hereby certify tha~~ rect (This space for State o~e~use) CO~DITZ-ONS OFk-P'~RbV~,L, I~ AN~.' -/ ' ~ffmlON OF OIL Atm~ ~ TITLE OPERATIONS MANAGER DATE 11/5/69 TITLE See l~nstrucfions On Reverse Side Approved Cop'~ Returned · ~,//-~/ 4~ c BP ALASKA INC. DRILLING PROGRAM - PUT RIVER 04-11-13 COI FIDI ITIAI. STATUS AND REFERENCE DATA Status Type Well Surface Location Bottom Hole Objective: Estimated KB Elevation Projected Depth : New Well : Development, deviated from pad in Block 2, TllN, R13E, UPM : 1245' WEL, 860' SNL, Section 9, TllN, R13E, UPM 1980' EWL, 1980' NSL, Section 4, TllN, R13E, UPM : 55' : 9230' T.V.D. (10,100' drilled depth) OBJECTIVE To open the Triassic sandstone reservoir for oil production and to provide data for the study of lithological variations in the area of Block 2, TllN, R13E. GEOLOGICAL FORECAST: Tertiary and Quaternary Jurassic and Cretaceous Upper Triassic Upper Triassic Triassic Gravels, sands and clays Mudstones with sandstones decreasing downwards Fine-grained sandstone (Oxytoma sand) Shales to thin limestones (Shublik Formation) Sandstones, conglomerates, minor shales (Sadlerochit Formation) Surface - 3800' TVD 3800 - 8420' TV]) 8420 - 8450' TVD 8450 - 8530' TVD 8530 - 9230' TVD The Triassic reservoirs are expected to contain both gas and oil. Minor hydro- carbon bearing reservoirs may be encountered in the Cretaceous. SAMPLING AND CORING PROGRAM A Baroid logging unit should be in operation and samples collected at 30 foot intervals from'the 13-3/8" casing shoe downwards. 10 foot samples should be collected'from 8000 ft. T.V.D. Four cuts of the samples should be collected. No conventional or sidewall cores are required at present; however, the necessary equipment should be available in case spot cores are required,. /~ [~:~!~¥ Operations Manager 11/5/69 ~/I~flC~Ofl~Hi~G/~S BP Oil CorPoratioN P. O. BOX 4-1395 I2! WEST FIREWEED LANE, SUITE 205 ANCHORAGE, ALASKA 9950:3 TELEPHONE 277- I422 June 10, 1969 0-00128 STRICTLY CONFIDENTIAL State of Alaska Division of Oil & Gas Department of Natural Resources 3001 Porcupine Drive Anchorage, Alaska 9~504 Attention: Mr. Thomas R. Marshall, Jr. Gentlemen: Monthly Reports of Drilling and Workover Operations Attached hereto are Monthly Reports of Drilling and Workover Operations for the month of May 1969, in Connection with the following wells:- BP 31-10-16 BP 14-10-14 04'11-13 BP 09-11-13 BP 33-11-13 BP 24-10-14 Very truly yours, HJC:hw Enclosures Operations Manager Form No. P--4 REV. STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS SUBMIT IN DUPLICATE CONFIDENTIAL AP1 NUAIERICAL CODE API 50-029-20025 LEASE DESiGN'Ai'ION AND SERIAL NO. ADL 28281 WELL WELL OTHER ~. NA/~E OF OP~/~TOR BP 0IL CORPOI~TION 3. ADDRESS OF OPEI:LATOR P. 0. BOX 4-1395~ AnchoraKe, Alaska 99503 4. LOCATION OF WTM 10. At surface: ii. 1245' WEL, 860' SNL, Section 9, TllN, R13E, IJPM At proposed prod. zone: 2640' EWL, 2640' NSL, Sect±on 4, TllN, R13E, I.IPM 12. PERMIT NO. 69-45 13. REPORT TOTAL DE~TH AT END OF MONTH, CI-LA_NGES IN HOLE SIZE, CASING A/ND CEMENTING JOBS INCLUDING DEPTH SET A1N-O VOLLrNf~ USED, PERFORATIONS. TESTS AiN-D I~ESULTS. FISHING JOB~. JLrNK IN HOLE AND SIDE-TRACKED HOLE AND A_NY OTHER SIGNIFICANT CI-IA-NGF-.S IN HOL.~ CONDITIONS. '~STRICTLY'CONFIDENTIAL May 1969 8. Lq%'IT,F.~i OR LEASE NA3~E Put: River g. WELL NO. BP 04-11-19 · '~ A_ND POOL. OR WILDCAT Prudhoe Bay SEC.. T., R., I%i.. (BO'I'I'OM HOLE ommcTrVE) Sec 4, TllN, R13E, UPM May 16 - 21 May 22 - 25 May 26 -28 Moved from BP 10-11-13to BP 04-11-13. Ran and cemented 30" conductor at 70' with 280 sacks cement. Spud 17½" hole at 0900 hours, May 22. Drilled 17½" hole to 1125'. Opened to 26" to 945'. Conditioned hole. 1400 sacks cement. on May 28., 1969. Ran and cemented 20" casing at 945' with Nippled up. Rig released at 1900 hours ~t~"t~.~r~'~~a~-'~'~'~"'~"'~'~(/_.~//~_/~ operations Manager June 10 1969 14. I hereby :l,',r, (~ NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. June 10, 1969 ..................... ' Mr. F. G. Larminie Area Manager BP Oil Corporation P. O. Box 4 - 1395 Anchorage, Alaska 99503 Re: Put River BP 04-11-13 sec 4, TllN, R13E, UPM Dear Mr. Larminie' In reference to the subject drill-site, the following stipulations are required to preserve and protect fish and game resources' 1. Prior to start of drilling, a gravel pad of sufficient thickness to prevent degradation of permafrost will be constructed. a. Access to this site shall be by all-season gravel road or by aircraft. b. Access to this site by winter road will be only when surface conditions are such that land damage will not occur. 2. Prior to the beginning Of drilling, a sump of sufficient size to contain all waste fluids will be constructed. This sump must be lined with material impervious to oil and oil products at all seasons during the year. Prior to abandonment of the site, the sump must be cleaned of all oil and covered. 3. 'The operator must dispose of all waste, including garbage, by burning, with non-combustible material and un-burned residue disposed of in a manner and in a location acceptable to the Alaska Department of Fish and Game, i.e., in some locations burial may be required, in other's removal from'the site may be necessary. 4. Sewage and waste water will be disposed of by lagooning or the cesspool-septic tank method. No stream or body of water will have any sewage or waste water added to it. 5. The Habitat Biologist's Office, 1018 East International Airport Road, Anchorage, Alaska 99502, will be notified prior to abandonment of this location. cc: B. Hilliker H. Burrell ~ JUN 111959 DIVI$1C~ OF Olt AND GA~ 0-00096 US 7-2-04-11-13 BP OIL CORPORATION P, O. BOX 4-I:~95 12I WEST F1REWEED LANE, SUITE 205 ANCHORAGE, ALASKA 99503 TELEPHONE 277-1422 May 27, 1969 OICO ~- / KLV ~ HWK REL ~ RECEIVE1) MAY 2 9 1969 I)I¥IIIOH OF OIL AND Oil & Gas Division Department of Natural Resources 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. Thomas R. Marshall Gentlemen.: Put RiVer BP 04-]_1-13 - Permit NO. 69'45 This is to inform you of our wish to move the bottom hole location of this well some 933 feet to the .southwest. It is our intention, following the discussions last month between our Messrs. Stoneley and Allen and the Oil & Gas Division, to aim each of our deviated wells at the center of the NE/4 of the SW/4 of each section, rather than to the center point of the section. The bottom hole ~ation of the subject Well will therefore be: 1980' NSL, 19~0~, Section 4, ?llN, R13E, UPM, and we should be grateful if you w~6~id make the necessary amendments to our drilling permit. The surface hole for this well has already been drilled with our light rig to a depth of 1,125 feet and 20" casing is due to be run today, but we do not anticipate moving the big rig onto the location until 1970. Very truly yours, BP OIL CORiPORATION F, G, Larminie Area Manager FGL:hw DIVISION OF OIL A~D ~S April 24, lg6g Re: Put River g 04-11-13 BP Oil Corperation, Operator )Ir. F, Area ~g Oil P. O. Oear Sir-. £~l,e~ ts the approwe~ appllcatioa for permit te drill the refer- enced well. '~11 s~mples mhd core chips are required. Please note that Items 14 and 17 were net fille~ t:~ by ~. State this well is loca~ in the center of a section and state, de ~les are in effect uatll modified by an m~der or exceptie~, we reserve right to ~stgflmte the 160-acre quarter sectioa in which the ~ell s-h~ll be dee~ to be located, unless otherwise shewn by survey. ~val of this or any other well locate~ at or ~r the center of a section shall in no ~ay imply that (1) any order or e~ception will be grante~ varyt'~ the provisions of 0il a~ Gas C~~ation 20~1; {2) uaittzatton ~ill be orde~d ~rsuant to AS 31.05.110; or preductte~ finam, a~ well sa l~te~.,.~ mat be ~ter~t~ to be weste, a~ ~aste is deftae~ tn AS, 31.0S.170(11). Ple. ase note ~t. ~ have required that t~e ~E be installed Immediately after settt~ ~ ~O-inch casing. Alaska D~ar~nt of Fish ~nd Ga~e st4palations, when receive~, will be forwarded to you a.~ ~ 11 ~co~e condi ttons of subject perait. In the event of abamto~t, pleast ~tify tbts office a~equately in advance so that we aay have a witness present. Ye~ truly y~jrs, E~closure i~mer L. E)urrelt Director ·. (Other instructions ~n Form P~I 1 STATE OF ALASKA _I~¥1$1~UD.F~OIL AND gAS OIL AND GAS CONSERVATION APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK l&. TYPE OF WORK DRILL J~ DEEPEN J-'l PLUG BACK b. TYPE OF WELL OIL ~ GA8 ['-] 8INGLE ~] MULTIPLE ~_~ WELL WELL OTHER ZONE ZONE 2. NAME OF OPEP,-&TOR BP Oil Corporation 3. ADDRESS O~ OPERATOR P. 0. Box 4-1395, Anchorage, Alaska 99503 LOCATION OF WELLAt surface 1245' ~EL, 860' SNL, Section 9, TllN, R13E, UPM At proposed prod. zone o~/.n, ~.n o~,.n, xxeT Section 4. TllN. RI~E. lrPM 13. ~)~'S~i~NCE-~I~r~LE~"'AwN'~ DI~'C~ON F.%OM NEARES~T TOWN dR.POST O~FICE* 100 miles NE of Umiat STRICTLY CONFIDENTIAL OKG ~ ~L-28281 HWK ~. IF ~I~, ~~ OR ~k ~~ 8. ~IT~F~ OR ~E N~ ~ " Put ~ver FILE 9. ~LNO. BP 06-11-13 10. ~ AND POO~, O~ WlB~AT Prudhoe Ba~ HOLE OmmTIVE) Section '~, T11N, R13E, ~M 12. 14. BOND INFORMATION: 15, DISTANCE FROM PROPOSED* il0. NO. OF ACR~ IN LEASE ~ (~0to~ 'g' '" ., & .... ~r~ ~ .... ~ .... 1 2560 . ~. D~STANCg ~RO~ PnOPOSED LOC~6~v; ............. v ] t~. PROPOS~ m~ TO NEAREST WELL DRILLING, COMPLETED, J OR APPlieD FOR, ~T. ~ 3780' from Put River BP 09-11-13 I 9~450 T,V,D. 21. ELEVATIONS (Show whether DF, RT, C-R, etc.) Estimated 40' KBE 23., P~OPOSED CASING A_ND cEMENTING PROGRAM 17. NO. ACRES ASSIGNED TO THiS WELL 20. ROTARY OR CABLE TOOLS Rotary APPROX. DATE WORK WILL START* . April 28, 1969 SIZE OF HOLE SIZE OF CASING '"'WEIGHT PER FOOT GRAI)E t' sETTiNG DEPTH QUANTITY OF CEMEN~ 26" 20" 'gA lh ]~t' ~-flO 10O0 t 1000'0~ - W,nna,,/Fl y A~h 17 1/2" 13 3/8U 6gA61' lb/ft K55/J5~ 4780' 4200'0~ Class~G/Fresh Water 12 1/4" 0 5~8". a7 lb/ft ~-g0 105a0'~50'~C]~ G/Brine . . BD T~ ...... Geological Forecast Tertiary and Quaternary Jurassic and Cretaceous Triassic Gravels, sands and clays Muds,ones and sandstones Sandstones, shales and limestones Surface,3,800 ' 3,800-8,795' 8,795-9,450' CONTINUED ON ATTACHED IN ABOVE SPACE DESCRIBE PROPO, S~G~A1Vi: If ~1 is.~ deepen or p[~ ~ck, give ~ on preset) p~du.~ive ~ ~d proposed new produ~ive ~. If pro,~ ~ ~I or d~n d~e~:o~lly, g~ve pe~ment ~ on subs~ace ~ ~d meas~d ~d ~ue venial dept. Give blo~~nt~rogr~m. 24. I hereby ce~ify that the Fore~g ~~e~~ " ' //~'~~ ~._ April 17- 1969 _ ~ Area Manager STGN~ . I o~'~ ......... ~ -r~'~ ,,, ~This space for S~te offi~~ coNDI~ONS OF ~P~OV~, IF A~: . S~PLES AND CORE CHIPS REQUI~ ~ YES [] NO DIRECTIONAL SURVEY REQUIRED YES [] NO ~ REQU~TS: B P 0 E required immediately after setting 20" ca, l.$1Jng. A.P.I. NU1V~RICAL CODE STRICTLY C ONFIDENTLAJ~ BP 04-11-13 Dry bucket 36" hole to about 60' and cement 30" conductor to surface with Fondu/Fly Ash. Drill 26" hole to 1000' and cement 20" casing to surface with Fondu/Fly Ash. Drill 17 1/2" hole to about 4780' drilled depth (4200' TVD) and cement 13 3/8" anchor string in two stages using Class G/fresh water slurry. During this section of the hole angle will be built from a kickoff point below ~the 20" shoe to a maximum value for the well. Drill 12 1/4" hole to about 10540' drilled depth (9450 TVD) and cement 9 5/8" casing in two stages using Class G/brine slurry. The hole will be maintained at maximum angle to about 8090' drilled depth (7000' TVD) then allowed to return to vertical. Blowout preventer program is 3000 p.s.i, pipe rams, blind rams and Hydril from the setting of the 13 3/8" casing and 5000 p.s.i. WP pipe rams, blind rams and Hydril following the setting of 9 5/8" casing. I I I DIRECTIONAL I · 4 Til N RI3E ~ 2,640' VERTICAL 0¢ II 15 {SE[ I~TAIL} (LOCATED THIS SURVEY .o,~.,~s° ~o' ~o.~"1 ~,,ECT,O,,~ ~= ~.~o.~s~ I SEC.lO T,I..,~ I X= 643, i 50 DIRECTIONAL SEC. 3 TIIN RI O' 2,64 ._1 I (WELL LOCATIONS) SCALE I"= I/2 MILE CERTIFICATE OF SURVEYOR I hereby certify that I am properly registered and licensed to practice land surveying in the State of Alaska and that this plat represents a location survey made by me or under my supervision, an~, that all dimensions and other -"-z 5 5r'-- ~5 ' :500' PAD DETAIL SCALE - I/20"= I0' details ar'e correct. Date S~RVEYOR / APR 18 I969 DIVISION OF OIL AND GAS ANCHOI~;GE . L~zcoted I.J~IIAT. MERIDIAN AK SEC,9 TI I NE I~ · ~;-~ ~ ~ ~ e ~ for B-P OIL COR R 117FIREWEED LANE ANC. AK. Surveyed by F.M. LINDSEY I~ ASSOC. LAND ~ HYDROGRAPHIC SURVEYORS 2502 West Northern Lights Boulevard Box 4-08 Anchorege' Alask( FORM SA- I B MEMORANDUM State of Alaska DEPART~NT OF' NA~ ~CF.S DIVISION OF OIL AND GAS FROM: timer L. Bury,ell DATE : Aprtl 24,, 1966 SUBJECT: P~t Rl~er BP 04-11-13 BP 0tl ~tton, Operat~or E~losed ~ tile epprm, ed aPPlication for pemtt to ch'"111, &locatton pllt, ~: a ~. tn ~ amouat of ~ ~ ftlt~ fee. FORM SA- J B ~ MEMORANDUM TO: J-- Dona. lslis~!l ~fet~' Imsp~tor FROM: tmmr L. Butte11 State of Alaska OlVISlffi ~ OIL AI~ ~ DATE : ~1 24,, 19Jffi SUBJECT: PJJt River BP 0t-11-13 IF 0ti Corperatton. Ope~ Enclosed ls the ~pflw~ed ~pplicatSae to drt11 for ~ abov~ c~tloned vel1. :E, lml~ FORM SA- J B MEMORANDUM TO:F FROM: State of Alaska DEF~ OF NA~ DIVISION OF OIL/L~ GAS SUBJECT, I)l[t Rt~ JlIt 04-11-13 A/00033 US 7-2-PR-04-11-13 BP Oil CORPORATION P. O. BOX 4-1395 121 WEST FIREWEED LANE, SUITE 205 ANCHORAGE, ALASKA 99503 TELEPHONE 277-1422 April 17, 1969 R CEiV; APR 18 1969 DIVISION OF OIL AND GA5 ANCH0i~.G.= State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 STRICTLY CONFIDENTIAL Attention: Mr. Thomas R. Marshall, Jr. Chief Petroleum Geologist Gentlemen: BP 04-11-13 Please find the following enclosed herewith: 1. Application for a permit to drill the above well on.the Arctic Slope, Alaska 2. Three copies of the surveyor's plat showing the location of the proposed well. 3. A check for $50 to cover the permit filing fee. We should be obliged if you would process this application as quickly as possible as we propose to begin drilling operations on or about April 28th, 1969. FGL/raw Enclosures Your '/r '~'~ y, iuF~. Larminie Area Manager cc: Mr. J.W. Martyr CHECK-LIST FOR NEW WELL PERbiITS 1. Is well to be located in a defined pool ........................ ...... Yes No Remarks 2 D stat°wide rules apply ' (~. 3o Is a registered survey plat attached ................................ ~ 4. Is well located proper distance from property line ........... o ...... _ __ 5. Is well located proper distance from other wells .................... ~A ~_ _ 6. Is sufficient undedicated acreage available in this pool ............ ~ __ '7 is well to be deviated eras, or only '~f d ty ~/~ 8. Is op "~ the a_ ecte par ................................. ____ .... o 10. ll. 12. Can permit be approved before ten-day wait ,... ...................... J~ _ . Does operator ha bond in :fo ~ Is conductor s~rin~-~:~ provided ......................... ,, ...... ~ ...... ~, Is enough cer~:nt u3ed to circulate on conductor and surface ......... __ .; Will ail casing giVe'"adequate':safety in collapse and 'tehsion ...... ....~ ' 17° Will cement cover all possible productive hOriZons Will surface casing cover all fresh water'z0~'~s 18.~ s~ff ting hoes BOPE have ~ icient pressure ra 19 C~-~ this permit be pproved imn~:adiately Approval Reconm~ended: Thoma~ R. Marshall, Jr. ~ Harry W. Kugler O. K. Gilbreth, Jr. ~ Karl L. VonderAhe Robert E. Larson Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file, To improve the readability of the Well History file and to simplify'finding information, information of this nature is accumulated at the end of the file under APPENDIXi No special'effort has been made to chronologically organize this category of information. .o * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... RECEIVED Naska Oil & ~as Cons, Com~ COMPANY NAME : BP EXPLORATION WELL NAME : J- 3 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292002500 REFERENCE NO : 97256 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/06/20 ORIGIN : FLIC REEL NAME : 97256 CONTINUATION # : PREVIOUS REEL : COMPIENT . BP EXPLORATION, PRUDHOE BAY, J-3, API #50-029-20025-00 PAGE: **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/06/20 ORIGIN : FLIC TAPE NAME : 97256 CONTINUATION # : 1 PREVIOUS TAPE : COiVI~IENT : BP EXPLORATION, PRUDHOE BAY, J-3, API #50-029-20025-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: J-3 API NUMBER: 500292002500 OPERATOR: BP EXPLORATION LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 20-JUN-97 JOB NUMBER: 97256 LOGGING ENGINEER: S.DECKERT OPERATOR WITNESS: S.BUNDY SURFACE LOCATION SECTION: 9 TOWNSHIP: lin RANGE: 13E FNL: 860 FSL: FEL: 1245 FWL : ELEVATION (FT FROM MSL O) KELLY BUSHING: 56.80 DERRICK FLOOR: GROUND LEVEL: 36.80 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) .............................................. 1ST STRING 10. 750 2398.0 2ArD STRING 9. 625 10334. 0 47. O0 3RD STRING 7. 000 9440.0 26. O0 PRODUCTION STRING 4. 500 9501 . 0 12. 60 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: ECS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH 88888 0 9988 0 9960 5 9930 0 9914 5 9907 5 9900.5 9897.5 9896.5 9884.0 9852.0 9851.5 9838.5 9833.5 9829.5 9825.0 9822.0 9818.0 9812.5 9805.0 9782.5 9778.5 9769.0 9753.5 9749.0 9747.5 9742.5 9732.5 9726.5 9719.0 9704.0 9699.0 9695.0 9690.5 9682.5 9679.0 9677.0 9676.0 9673.5 9669.5 9653.0 9629.5 9590.5 9587.0 9585.0 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNTD 88886.0 88886.0 9986.0 9986.0 9958.0 9958.0 9927.0 9927.0 9912.0 9912.0 9904.0 9904.0 9898.0 9898.0 9895.0 9882.0 9850.0 9836.5 9831.0 9828.0 9823.0 9820.0 9816.0 9812.5 9804.0 9782.0 9777.0 9768.0 9753.0 9749.0 9747.0 9742.0 9732.5 9726.0 9719 0 9703 5 9697 5 9695 0 9689 5 9683 0 9677 5 9677 0 9675 0 9673 0 9669 0 9653 0 9630 0 9591 5 9587 5 9585 5 9895.0 9882.0 9850.0 9836.5 9831.0 9828.0 9823.0 9820.0 9816.0 9812.5 9804.0 9782.0 9777.0 9768.0 9753.0 9749.0 9747.0 9742.0 9732.5 9726.0 9719.0 9703.5 9697.5 9695.0 9689.5 9683.0 9677.5 9677.0 9675.0 9673.0 9669.0 9653.0 9630.0 9591.5 9586.5 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 9583.5 9585.5 100.0 100.5 102.0 $ CONTAINED HEREIN IS THE CNTD DATA ACQUIRED ON BP EXPLORATION'S J-3 WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #1 GRCH TO GR.BCS; AND PASS #1 NPHI TO GR.BCS. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NIIMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10054.0 9570.0 CNTD 10067.0 9570.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: .... ~ ..... EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GRCH CNTD REMARKS: THIS FILE CONTAINS CNTD PASS #1. NO PASS TO PASS SHIFTS WERE APPLIED TO THIS DATA. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 .............................. ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ....................................................................................... DEPT FT 506004 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTD PU-S 506004 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNTD 506004 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTD 506004 O0 000 O0 0 1 1 1 4 68 0000000000 NCNTCNTD CPS 506004 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNTD CPS 506004 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNTD CPS 506004 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTD CPS 506004 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTD GAPI 506004 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTD LB 506004 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTD V 506004 O0 000 O0 0 1 1 1 4 68 0000000000 ....................................................................................... ** DATA ** DEPT. 10065. 000 NPHI. CNTD 40.918 NRAT. CNTD 5. 951 CRAT. CNTD NCNT. CNTD 2792.399 FCNT. CNTD 461.647 CFTC. CNTD 448.584 CNTC. CNTD GRCH. CNTD -999. 250 TENS. CNTD 1265. 000 CCL. CNTD O. 000 DEPT. 9570.500 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH. CNTD 80.000 TENS. CNTD -999.250 CCL.CNTD -999.250 6.293 2825. 347 -999.250 -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~BER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMFiARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10054.0 9574.0 CNTD 10067.0 9574.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH CNTD 88888.0 88886.5 88886.0 10056.5 10054.5 10054.5 10053.0 10050.5 10049.0 10042.5 10041.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: 10033.5 10029.5 10026.5 10019.0 10014.0 10008.0 9997.0 9995.5 9994.0 9981.5 9974.0 9963.0 9960.0 9959.0 9954.5 9950.0 9942.0 9932 5 9928 5 9920 0 9918 0 9914 5 9914 0 9913.0 9908.5 9907.5 9898.5 9897.0 9895.5 9883.5 9883.0 9877.5 9852.0 9851.0 9840.0 9838.5 9832.5 9829.5 9821.5 9817.5 9796.0 9786.5 9782.0 9778.5 9768.5 9766.5 9761.0 9755.0 9753.0 9752.0 9749.0 9745.5 9742.5 9742.0 9736.5 10025.5 10012.5 10006.5 9996.5 9994.0 9972.0 9960.5 9958.0 9953.0 9948.5 9939.5 9912.0 9905.5 9895.0 9882.0 9850.0 9837.0 9831.0 9828.0 9820.0 9816.0 9782.5 9777.5 9768.0 9753.0 9749.5 9742.0 10032.0 10027.5 10017.5 9992.5 9979.5 9957.0 9940.0 9930.5 9926.0 9917.5 9916.0 9912.5 9910.5 9904.5 9897.0 9894.5 9881.5 9876.0 9850.0 9838.5 9828.0 9815.5 9796.0 9786.5 9766.5 9760.5 9754.5 9753.0 9745.5 9742.0 9737.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: 9730.5 9731.0 9726.0 9726.0 9725.5 9726.0 9719.0 9719.5 9718.5 9719.0 9716.5 9716.5 9713.5 9714.0 9708.0 9708.0 9706.5 9706.5 9704.0 9704.0 9702.5 9702.0 9701.5 9701.0 9699.0 9697.5 9698.5 9697.5 9694.5 9695.0 9695.0 9690.5 9690.0 9690.0 9690.0 9686.0 9686.0 9683.5 9684.5 9682.5 9683.5 9678.5 9677.5 9677.0 9677.0 9675.5 9675.0 9674.5 9674.0 9673.0 9673.0 9672.5 9672.5 9668.0 9668.0 9661.5 9662.0 9653.0 9653.0 9652.5 9652.5 9647.5 9648.0 9648.5 9636.5 9637.5 9633.5 9634.5 9632.5 9633.5 9629.5 963 O. 5 9629.0 9630.0 9622.5 9623.5 9617.0 9618.0 9604.0 9604.5 9595.0 9596.5 9593.0 9594.5 9591.0 9592.0 9587.0 9588.0 9586.5 9586.5 9584.5 9585.5 9584.0 9585.5 9580.5 9583.0 9580.0 9581.0 9578.5 9580.0 100.0 101.0 101.5 $ REMARKS: THIS FILE CONTAINS CNTD PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #2 GRCH TO PASS #1 GRCH; AND PASS #2 NPHI TO PASS #1NPHI. ALL OTHER CNTD CURVES WERE LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ....................................................................................... DEPT FT 506004 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTD PU-S 506004 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTD 506004 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTD 506004 O0 000 O0 0 2 1 1 4 68 0000000000 NCNTCNTD CPS 506004 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNTD CPS 506004 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTD CPS 506004 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTD CPS 506004 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTD GAPI 506004 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTD LB 506004 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTD V 506004 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: DEPT. 10065.000 NPHI.CNTD 42.993 NRAT. CNTD NCNT. CNTD 2747.802 FCNT. CNTD 443.843 CFTC. CNTD GRCH. CNTD -999.250 TENS.CNTD 1255.000 CCL. CNTD 6. 341 CRAT. CNTD 434. 669 CNTC. CNTD 0.000 DEPT. 9575.000 NPHI. CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH. CNTD 77.750 TENS. CNTD -999.250 CCL. CNTD -999.250 6.522 2810.964 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE ArUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH ................................... GRCH 10054.0 9570.0 CNTD 10067.0 9570.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... LIS Tape Verification Listing Schlumberger Alaska Computing Center BASELINE DEPTH .............. 88888.0 10045.5 10035.0 10026.5 10014.0 10011.5 10010.0 1OOO8.0 10003.0 9998.0 9993.5 9987.5 9976.0 9962.0 9960.5 9957.5 9949.0 9941.5 9939.0 9928.0 9914.0 9913.5 9912.0 9907.5 9901.5 9898.0 9896.5 9892.5 9883.0 9882.5 9877.5 9873.5 9864.5 9861.0 9856.0 9851.5 9850.5 9840.0 9838.0 9837.0 9833.0 9832.0 9829.0 9821.5 9819.5 9816.5 9795.0 9787 5 9784 0 9778 5 9777 5 9773 5 9768 0 G R CH CNTD .............. 88887.0 88887.0 10025.5 10012.5 10010.5 10009.5 10007.0 10001.5 9997.0 9986.0 9975.0 9960.5 9956.0 9939.5 9912.0 9895.0 9882.0 9850.0 9837.0 9831.5 9828.0 9820.0 9788.0 9777.5 9768.0 10044.5 10034.0 9992.5 9959.0 9947.5 9937.5 9926.0 9912.5 9910.5 9904.5 9900.0 9897.0 9891.0 9881.5 9876.5 9873.0 9863.0 9860.0 9854.5 9850.0 9839.0 9835.5 9831.0 9828.0 9818.5 9815.0 9796.0 9784.0 9777.5 9773.5 20-JUN-1997 13:33 PAGE: 10 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: 11 9766.5 9767.0 9762.5 9761.5 9754.0 9755.0 9753.0 9753.0 9752.0 9753.0 9749.0 9749.5 9749.0 9747.0 9747.0 9746.5 9747.0 9745.0 9745.5 9741.0 9742.0 9736.5 9737.0 9732.0 9732.5 9733.0 9725.5 9726.0 9725.0 9725.5 9722.5 9723.0 9718.5 9719.0 9718.0 9718.5 9716.0 9716.5 9706.5 9707.0 9703.5 9703.5 9703.5 9702.0 9702.0 9698.5 9697.5 9698.0 9697.5 9694.0 9695.0 9695.0 9689.5 9689.5 9689.5 9686.0 9686.5 9683.5 9684.5 9682.0 9683.0 9678.5 9678.0 9676.5 9677.0 9672.5 9672.5 9672.5 9668.5 9669.0 9667.5 9668.0 9664.0 9665.0 9662.5 9663.0 9661.5 9662.0 9658.5 9659.5 9652.5 9653.0 9653.0 9647.5 9648.5 9645.5 9646.0 9640.0 9640.5 9636.5 9637.5 9631.0 9632.5 9629.0 9630.0 9630.5 9625.0 9626.0 9622.5 9624.0 9621.0 9622.5 9620.0 9621.0 9618.0 9618.0 9615.5 9615.5 9610.5 9612.5 9603.0 9604.5 9595.0 9596.5 9592.5 9595.0 9590.0 9592.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: 12 9586.0 9587.5 9586.5 9584.5 9585.5 9583.0 9585.0 9580.0 9581.0 9583.0 100.0 101.0 103.0 $ Ri~W3~RKS: THIS FILE CONTAINS CNTD PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #3 GRCH TO PASS #1 GRCH; AND PASS #3 NPHI TO PASS #1 NPHI. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 506004 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI CNTD PU-S 506004 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNTD 506004 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTD 506004 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNTD CPS 506004 O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNTD CPS 506004 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTD CPS 506004 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTD CPS 506004 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: 13 NAME SERV UNIT SERVICE API API API API FILE ~ NUFIB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX) GRCH CNTD GAPI 506004 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTD LB 506004 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTD V 506004 O0 000 O0 0 3 1 I 4 68 0000000000 ....................................................................................... ** DATA ** DEPT. 10066.000 NPHI.CNTD 39.114 NRAT. CNTD 5.767 CRAT. CNTD NCNT. CNTD 2771.831 FCNT. CNTD 490. 728 CFTC. CNTD 465. 657 CNTC. CNTD GRCH. CNTD - 999. 250 TENS. CNTD 1245. 000 CCL. CNTD O . 000 DEPT. 9571.000 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH. CNTD 78.750 TENS. CNTD -999.250 CCL. CNTD -999.250 6.096 2833.737 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: 14 CNTD 1,2,3, THE ARITHMETIC AVERAGE WAS CALCULATED AFTER CLIPPING AND DEPTH CORRECTIONS WERE APPLIED. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ....................................................................................... DEPT FT 506004 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNAV PU-S 506004 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CNAV 506004 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNAV 506004 O0 000 O0 0 4 1 1 4 68 0000000000 NCNT CNAV CPS 506004 O0 000 O0 0 4 1 1 4 68 0000000000 FCNT CNAV CPS 506004 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 506004 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 506004 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTD GAPI 506004 O0 000 O0 0 4 1 1 4 68 0000000000 TENS CNTD LB 506004 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center ** DATA ** 20-JUN-1997 13:33 DEPT. 10065. 000 NPHI. CNAV 41 . 467 NRAT. CNAV NCNT. CNAV 2782. 262 FCNT. CNAV 451 . 914 CFTC. CNAV GRCH. CNTD -999. 250 TENS. CNTD 1265. 000 DEPT. 9570 . 500 NPHI. CNAV -999. 250 NRAT. CNAV NCNT. CNAV -999 . 250 FCNT. CNAV -999 . 250 CFTC. CNAV GRCH. CNTD 80. 000 TENS. CNTD -999. 250 6.147 CRA T . CNA V 445 . 287 CNTC. CNAV -999. 250 CRAT. CNAV -999. 250 CNTC. CNAV PAGE: 15 6.354 2825.353 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : OOiCO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: O . 5000 FILE SUMFIARY VENDOR TOOL CODE START DEPTH ........................... CNTD 10089.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : STOP DEPTH 9567.0 15-MAY-97 CP 42.2 1650 15-MAY-97 10082.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): 10064.0 9570.0 10060.0 900.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... AMS AUXMEAS SONDE CNTD COMP NEUTRON $ TOOL NUM~ER ........... ATM 277 CNTD 146 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : 10334.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHCS DATED 1-1-70. SANDSTONE MATRIX THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #1. $ LIS FORMAT DATA PAGE: 16 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: 17 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ....................................................................................... DEPT FT 506004 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PS1 PU 506004 O0 000 O0 0 5 1 1 4 68 0000000000 RTNR PS1 506004 O0 000 O0 0 5 1 1 4 68 0000000000 TNRA PS1 506004 O0 000 O0 0 5 1 1 4 68 0000000000 RCNT PS1 CPS 506004 O0 000 O0 0 5 1 1 4 68 0000000000 RCFT PS1 CPS 506004 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PS1 CPS 506004 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PS1 CPS 506004 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS1 GAPI 506004 O0 000 O0 0 5 1 i 4 68 0000000000 TENS PS1 LB 506004 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS1 V 506004 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 10089.500 NPHI.PS1 47.059 RTNR.PS1 6.609 TNRA.PS1 RCNT. PS1 2878.106 RCFT. PS1 435.503 CNTC. PS1 2922.541 CFTC. PSi GR.PS1 33.625 TENS.PSi 985.000 CCL.PS1 0.000 DEPT. 9567.000 NPHI.PS1 42.821 RTNR.PS1 6.095 TNRA.PS1 RCNT. PS1 2886.884 RCFT. PS1 466.667 CNTC.PS1 2932.893 CFTC. PSi GR.PS1 71.813 TENS.PSi 1220.000 CCL.PS1 0.000 6.987 418.263 6.497 446.207 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: 18 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUM~zARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10090.0 9570.0 CNTD $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 15-MAY-97 CP 42.2 1650 15-MAY-97 10082.0 10064.0 9570.0 10060.0 900.0 NO TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: 19 AMS AUX FLEAS SONDE CNTD COMP NEUTRON $ ATM 277 CNTD 146 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (PT) : 10334.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUAU~ RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHCS DATED 1-1-70. SANDSTONE MATRIX THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #2. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 I 0 66 1 ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ....................................................................................... DEPT FT 506004 O0 000 O0 0 6 1 1 4 68 0000000000 NPHI PS2 PU 506004 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS2 506004 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS2 506004 O0 000 O0 0 6 1 1 4 68 0000000000 RCNT PS2 CPS 506004 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS2 CPS 506004 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS2 CPS 506004 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 506004 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 506004 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 506004 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS2 V 506004 O0 000 O0 0 6 1 1 4 68 0000000000 20 ** DATA ** DEPT. 10090.000 NPHI.PS2 39.828 RTNR.PS2 5.840 TNRA.PS2 RCNT. PS2 2828.087 RCFT. PS2 484.261 CNTC. PS2 2871.749 CFTC. PS2 GR.PS2 26.313 TENS.PS2 975.000 CCL.PS2 0.000 DEPT. 9570.000 NPHI.PS2 46.098 RTNR.PS2 6.811 TNRA.PS2 RCNT. PS2 2608.219 RCFT. PS2 405.757 CNTC. PS2 2720.943 CFTC. PS2 GR.PS2 72.625 TENS.PS2 1215.000 CCL.PS2 0.000 6.175 465. 091 6.877 405. 369 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: 21 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE S~Y VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... 10089.5 9565.5 CNTD $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 15-MAY-97 CP 42.2 1650 15-MAY-97 10082.0 10064.0 9570.0 10060.0 9OO.O NO TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: 22 AMS AUXMEAS SONDE CNTD COMP NEUTRON $ ATM 277 CNTD 146 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) .. LOGGERS CASING DEPTH (FT) : 10334.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHCS DATED 1-1-70. SANDSTONE MATRIX THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #3. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~I CODE (HEX) DEPT FT 506004 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 506004 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS3 506004 O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PS3 506004 O0 000 O0 0 7 1 1 4 68 0000000000 RCNT PS3 CPS 506004 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS3 CPS 506004 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 506004 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 CPS 506004 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 506004 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 506004 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS3 V 506004 O0 000 O0 0 7 1 1 4 68 0000000000 23 ** DATA ** DEPT. 10089.500 NPHI.PS3 39.764 RTNR.PS3 5.833 TNRA.PS3 RCNT. PS3 2711.864 RCFT. PS3 464.891 CNTC.PS3 2753.732 CFTC.PS3 GR.PS3 26.313 TENS.PS3 1005.000 CCL.PS3 0.000 DEPT. 9565.500 NPHI.PS3 45.441 RTNR.PS3 6.718 TNRA.PS3 RCNT. PS3 2952.113 RCFT. PS3 439.437 CNTC. PS3 2933.351 CFTC. PS3 GR.PS3 71.000 TENS.PS3 1205.000 CCL.PS3 0.000 6.168 446.487 6.802 439.875 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1997 13:33 PAGE: 24 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/06/20 ORIGIN : FLIC TAPE NAME : 97256 CONTINUATION # : 1 PREVIOUS TAPE : COGENT : BP EXPLORATION, PRUDHOE BAY, J-3, API #50-029-20025-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 97/06/20 ORIGIN : FLIC REEL NAME : 97256 CONTINUATION # : PREVIOUS REEL : COGENT : BP EXPLORATION, PRUDHOE BAY, J-3, API #50-029-20025-00 J - 03 PRUDHOE BAY ::::::::::::::::::::::::::: Run 1' 09 - February - 1996 CNIGR Cased Hole 9575' 10065' Tape Subfile 2 is type.' LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING J-03 500292002500 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 26-FEB-96 6299.04 K. BRUNNER S. WHIP 9 11N 13E 860 1245 56.76 0.00 36.77 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 13.375 4447.0 61.00 10.750 2398.0 0.00 9.625 10334.0 47.00 7.000 9501.0 26.00 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: GR RUN NUMBER: 2 PASS NUMBER: 1 DATE LOGGED: 13-NOV-69 LOGGING COMPANY: SWS BASELINE DEPTH 9587.5 9597.0 9599.0 9599.5 9623.5 9625.0 9626.0 9629.5 9632.5 9636.0 9636.5 9646.0 9673.0 ......... EQUIVALENT UNSHIFTED DEPTH ......... GRCH 9588.0 9597.0 9599.5 9600.0 9624.5 9626.0 9626.5 9630.5 9633.5 9636.5 9637.5 9646.5 9674.5 9675.0 9690.0 9693.0 9694.0 9702.0 9703.0 9703.5 9706.0 9713.0 9715.5 9719.0 9720.5 9728.5 9729.5 9734.5 9742.0 9747.5 9753.0 9768.0 9771.5 9773.5 9777.0 9781.0 9782.0 9791.0 9800.0 9804.0 9820.0 9823.0 9824.0 9824.5 9828.0 9831.0 9836.0 9837.5 9895.0 9912.0 9958.5 9967.5 9989.0 $ REMARKS: 9676.5 9691.5 9695.0 9695.5 9703.5 9704.0 9705.0 9707.5 9714.5 9717.0 9720.0 9722.0 9730.0 9730.5 9735.5 9744.0 9749.0 9754.5 9769.5 9773.0 9776.0 9779.0 9783.5 9784.0 9792.0 9802.0 9806.0 9822.5 9825.5 9826.5 9827.0 9830.5 9834.5 9837.0 9840.0 9898.5 9915.0 9961.0 9970.0 9990.5 CN/GR Cased Hole. TIED INTO 09-JAN-70 CBL/GR WELL TEST SUMMARY TEST DATE ELAPSED TIME GROSS FLUID RATE NET OIL RATE NET WATER RATE FORMATION GAS RATE GOR LIFT GAS RATE CASING PRESSURE TGOR TGLR CHOKE OPENING MANIFOLD PRESSURE 05-FEB-96 4.0 HOURS 2.25 MBPD 1-75 MBOPD 0.50 MBWPD 25.58 MMSCFD 14588 SCF/STB 0.0 MMSCFD 0 PSIG 14588 SCF/STB 11369 SCF/BBL 39.9 1275 PSIG MANIFOLD TEMPERATURE 141 DEGF WATER CUT (CALC) 22.1 PCNT CONDITIONS DURING LOGGING: WHP= 1000 - 1250 PSI. PUMPED 325 BBL SEAWATER & 15 BBL METHANOL BEFORE LOGGING. 3 5/8" TOOL USED. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CHISM FILTERING ON, CALIPER & CASING CORRECTED, SALINITY = 0.0 PPM. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. / ? ?MATCHiA. OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2435 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: I START DEPTH STOP DEPTH 9562.0 10052.0 9575.0 10065.0 BASELINE DEPTH 9587.5 9597.0 9599.0 9599.5 9623.5 9625.0 9626.0 9629.5 9632.5 9636.0 9636.5 9646.0 9652.5 9673.0 9675.0 9690.5 9693.0 9694.0 '9702.0 9703.0 9703.5 9706.0 9713.0 9715.5 9719.0 9720.5 9728.5 9729.5 9734.5 9742.0 9747.5 9753.0 9768.0 9771.5 9773.5 9777.O 9781.0 9782.0 9791.0 (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... NPHI 9588.0 9597.0 9599.5 9600.0 9624.5 9626.0 9626.5 9630.0 9633.5 9636.5 9637.5 9646.5 9654.0 9674.5 9676.5 9692.5 9695.0 9695.5 9703.5 9704.0 9705.0 9707.5 9714.5 9717.0 9720.0 9722.0 9730.0 9730.5 9735.5 9744.0 9749.0 9753.5 9769.5 9773.0 9776.0 9779.0 9783.5 9784.0 9792.0 9800.0 9804.0 9820.0 9823.5 9887.0 9895.0 9899.0 9905.0 9912.0 9961.0 9964.0 9989.0 10025.5 R.E24ARKS: 9802.0 9806.0 9820.5 9824.0 9887.0 9896.5 9900.5 9906.0 9913.5 9962.0 9965.0 9990.5 10025.5 PASS 1. FUCT & NUCT WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. CN WN FN COUN STAT / ? ?MATCHIB. OUT $ : BP EXPLORATION (ALASKA) : J-03 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GRCH 2435 68 i GAPI 2 NPHI 2435 68 i PU-S 3 FUCT 2435 68 I CPS 4 NUCT 2435 68 i CPS 4 4 43 995 99 1 4 '4 43 995 99 1 4 4 43 995 99 1 4 4 43 995 99 1 16 * DATA RECORD (TYPES 0) 1006 BYTES * Total Data Records: 22 Tape File Start Depth = 10085.000000 Tape File End Depth = 9540.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Co~e= 68 5456 datums Tape Subfile= 2 250 records... Minimum record length= 62 bytes Maximum record length= 1006 bytes Tape Subfile 3 is type= LIS FILE HEADER FILE NUMBER= 2 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER= 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 9562.0 2435 9575.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: I STOP DEPTH 10052.0 10065.0 (MEASURED DEPTH) BASELINE DEPTH 9556.0 9569.0 9578.5 9579.0 9580.5 9581.0 9581.5 9582.5 9582.0 9583.0 9583.0 9583.5 9585.5 9586.0 9588.0 9588.5 9595.0 9595.5 9595.5 9596.5 9596.0 9596.5 9596.5 9597.5 9597.0 9597.0 9598.0 9599.5 9606.0 9607.5 9607.0 9608.0 9607.5 9608.5 9608.5 9609.0 9610.0 9610.5 9620.0 9621.0 9621.5 9622.5 9622.5 9623.5 9623.0 9635.5 9636.0 9636.5 9637.5 9650.5 9651.5 9654.0 9655.0 9660.5 9662.5 9661.0 9663.0 9662.0 9663.5 9662.5 9664.5 9663.5 9665.5 9664.0 9664.5 9664.5 9666.0 9668.0 9669.5 9669.0 9670.0 ......... EQUIVALENT UNSHIFTED DEPTH ......... GRCH NPHI 9556.5 9569.5 9579.0 9580.0 9670.0 9670.5 9673.5 9674.5 9675.0 9675.5 9680.5 9681.0 9683.0 9684.0 9687.0 9687.5 9690.5 9691.5 9694.0 9695.0 9703.0 9704.0 9705.0 9705.5 9707.0 9710.0 9713.0 9716.5 9717 · 0 9718 · 0 9719 · 0 9720.5 9721.0 '9723.0 9723.5 9725.0 9726.0 9728.5 9729.0 9731.0 9732.5 9733.5 9735.0 9742.0 9742.5 9743.5 9744.0 9752.5 9753.5 9757.0 9761.5 9762.0 9768.5 9769.0 9770.0 9770.5 9773.0 9779.0 9779.5 9781.0 9782.0 9785.0 9790.5 9795.5 9676.5 9688.5 9689.5 9692.5 9693.0 9708.5 9711.5 9714.5 9717.5 9718.5 9734.0 9734.5 9736.0 9755.0 9758.5 9781.5 9782.0 9783.0 9784.0 9786.5 9671.0 9672.0 9675.0 9675.5 9677.5 9682.5 9683.5 9685.5 9686.0 9696.0 9696.5 9704.5 9705.0 9706.0 9707.0 9719.5 9720.0 9721.5 9722.5 9724.5 9725.5 9727.0 9727.5 9730.0 9731.0 9733.0 9742.0' 9742.5 9743.0 9743.5 9753.0 9762.0 9763.0 9769.5 9770.5 9771.5 9772.5 9775.0 9792.0 9797.0 9804.0 9805.0 9806.0 9807.5 9808.5 9809.5 9810.0 9810.5 9813.5 9814.5 9820.0 9822.0 9822.5 9827.0 9836.5 9837.0 9837.5 9838.5 9841.5 9842.5 9843.0 9843.5 9846.0 9849.0 9849.5 9857.5 9858.5 9864.5 9865.5 9866.5 9870.0 9871.0 9872.0 9873.0 9895.0 9899.0 9907.0 9910.0 9912.0 9912.5 9914.0 9919.5 9931.0 9932.0 9934.5 9935.0 9940.0 9942.0 9945.5 9946.5 9952.5 9953.5 9958 · 5 9960.5 9962.5 9964.5 9966.5 9967.0 9967.5 9974.5 9806.0 9823.0 9825.0 9829.5 9838.5 9898.0 9910.0 9917.5 9933.5 9961.0 9963.5 9806.0 9807.0 9807.5 9809.0 9809.5 9810.0 9810.5 9811.5 9814.5 9815.0 9822.5 9823.5 9839.0 9839.5 9840.0 9843.0 9843.5 9844.0 9844.5 9846.0 9849.0 9850.0 9858.0 9858.5 9864.5 9865.0 9866.0 9869.0 9869.5 9870.5 9871.0 9900.5 9910.5 9912.5 9913.5 9920.5 9932.5 9936.0 9937.0 9942.0 9943.5 9947.0 9947.5 9953.5 9954.0 9963.0 9965.5 9967.5 9968.5 9969.5 9976.5 9975.5 9976.0 9988.0 9989.0 9991.5 10007.5 10025.0 10033 · 0 10034.5 10035.0 10037.0 10051.5 10054.5 10056.0 10056.5 10057.0 10057.5 10058.5 10059 · 0 10059 · 5 10069.0 10071.0 10076.0 10076 · 5 $ REMARKS: 9978.0 10009.5 10025.5 10056.5 10057.0 10057.5 10058.0 10058.5 10059.0 9977.0 9989.5 9990.0 9992.5 10033.0 10034.5 10035.5 10037.5 10051.5 10057.0 10059.0 10060.0 10069.5 10070.0 10075.0 10075.5 PASS 2. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH2A. OUT / ??MATCH2B. OUT $ : BP EXPLORATION (ALASKA) : J-03 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod I GRCH 2435 68 i GAPI 2 NPHI 2435 68 i 'PU-S 3 FUCT 2435 68 i CPS 4 NUCT 2435 68 I CPS 4 4 43 995 99 1 4 4 43 995 99 1 4 4 43 995 99 1 4 4 43 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 22 Tape File Start Depth ~ 10085.000000 Tape File End Depth = 9540.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5456 datums Tape Subfile: 3 237 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 9562.0 10052.0 2435 9575.0 10065.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: i BASELINE DEPTH 9556.0 9565.5 9566.5 9569.0 9581.0 9581.5 9582.5 9583.0 9586.0 9591.5 9592.5 9595.5 9596.0 9597.0 9598.5 9599.5 9607.5 9608.0 9610.0 9610.5 9611.5 9612.5 9613.0 9614.0 9615.0 9616.0 9623.5 9624.0 9628.0 9632.5 9633.0 9635.0 9635.5 9641.5 9642.5 9643.5 9646.5 ......... EQUIVALENT UNSHIFTED DEPTH ......... NPHI GRCH 9556.5 9566.0 9566.5 9581.5 9582.5 9583.5 9586.0 9596.0 9596.5 9623.5 9624.5 9636.0 9644.5 9569.5 9582.0 9582.5 9591.5 9592.0 9595.0 9597.5 9599.5 9607.5 9608.5 9610.5 9611.5 9612.5 9613.0 9613.5 9614.0 9615.0 9615.5 9628.0 9632.5 9633.5 9635.5 9641.0 9642.0 9644.5 9647.5 964'7.5 9652.5 9653.5 9655.0 9660.5 9664.5 9668.5 9674.0 9678.0 9679.0 9681.0 9681.5 9684.0 9685.0 9689.0 9689.5 9690.0 9691.0 9693.5 9696.5 9706.5 9708.0 9709.0 9709.5 9710.5 9711.5 9713.0 9714.0 9715.0 9716.0 9716.5 9717.5 9718.5 9721.0 9721.5 9730.0 9732.5 9733.5 9735.0 9735.5 9740.0 9743.0 9743.5 9747.0 9749.5 9751.5 9752.5 9755.0 9758.5 9766.0 9768.0 9770.0 9771.5 9772.5 9777.0 9780.5 9781.5 9788.5 9791.0 9793.5 9654.0 9656.5 9665.5 9707.5 9709.5 9711.0 9712.5 9714.0 9715.0 9715.5 9716.5 9717.5 9733.5 9734.0 9735.5 9736.5 9756.0 9769.5 9774.5 9778.5 9782.5 9789.0 9792.0 9648.0 9654.0 9661.5 9669.5 9676.0 9680.0 9680.5 9682.5 9683.5 9686.0 9686.5 9690.5 9691.5 9692.0 9692.5 9695.0 9697.5 9710.0 9711.0 9712 · 0 9712.5 9718.5 9719.0 9721.5 9722.5 9731.0 9740.5 9743.5 9744.5 9748.0 9750.0 9752.0 9752.5 9758.5 9767.5 9771.5 9772.0 9782.5 9783.5 9792.0 9794.5 9799.0 9799.5 9803.5 9806.0 9807.0 9810.0 9812.5 9813.0 9814.0 9821.0 9828.0 9830.0 9831.0 9836.0 9837.5 9838.0 9838.5 9839.5 9840.0 9842.5 9846.5 9849.0 9849.5 9856.5 9857.5 9860.5 9861.0 9861.5 9863.5 9864.5 9872.5 9873.0 9874.5 9876.5 9878.0 9881.0 9885.0 9887.0 9892.0 9892.5 9895.0 9898.0 9899.0 9905.0 9906.0 9907.5 9908'0 9911.5 9912.0 9912.5 9919.0 9920.0 9921.0 9934.5 9935.5 9936.0 9936.5 9944.0 9950.0 9953.0 9800.5 9801.0 9823.0 9830.0 9834.0 9839.5 9842.0 9884.5 9887.5 9890.0 9898'0 9908.0 9914.5 9952.0 9805.0 9807.5 9808.0 9811.0 9813.0 9813.5 9814.0 9830.0 9837.0 9838.5 9839.5 9840.0 9840.5 9843.5 9845.5 9848.0 9849.0 9856.0 9856.5 9859.5 9860.0 9860.5 9862.5 9863.0 9871.0 9872.0 9873.5 9876.0 9877.5 9892.5 9894.0 9899.5 9900.0 9906.0 9906.5 9908.0 9909.0 9912.5 9913.0 9919.5 9920.0 9921.5 9935.0 9935.5 9937.5 9938.0 9944.5 9953.5 9954.0 9954.5 9961.5 9966.0 9967.5 9968.5 9972.5 9975.0 9976.0 9976.5 9977.0 9987.0 9988.0 9989.5 9990.5 9992.0 9993.5 9997.0 10007.5 10025.0 10028.0 10033.5 10045.0 10054.5 10055.0 10056.5 10057.0 10059.5 10069.0 10070.0 10070.5 10071.5 10072.0 10072.5 10076.0 10076.5 $ REMARKS: 9954.0 9955.0 9964.0 9962.0 9967.0 9967.5 9969.5 9973.5 9975.0 9975.5 9977.5 9978.5 9988.5 9988.5 9989.0 9991.5 9991.5 9993.5 9994.0 9997.0 10009.5 10026.0 10029.0 10033.0 10047.0 10056.5 10054.5 10057.0 10056.5 10060.0 10069.5 10070.0 10070.5 10072.0 10071.0 10072.5 10073.0 10076.5 10075.5 10077.0 10076.0 PASS 3. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH3A. OUT / ? ?MATCH3 B. OUT $ : BP EXPLORATION (ALASKA) : J-03 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GRCH 2435 68 i GAPI 2 NPHI 2435 68 I PU-S 3 FUCT 2435 68 i CPS 4 NUCT 2435 68 i CPS 4 4 43 995 99 1 4 4 43 995 99 1 4 4 43 995 99 1 4 4 43 995 99 1 16 * DATA RECORD (TYPES 0) 1006 BYTES * Total Data Records: 22 Tape File Start Depth = 10085.000000 Tape File End Depth = 9540.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10912 datums Tape Subfile: 4 249 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER= 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass i gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2435 $ REMARKS: CN WN FN COUN STAT 1, 2, 3 1, 2, 3 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 3 PASSES. $ : BP EXPLORATION (ALASKA) : J-03 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ els Mod i GRCH CNAV 68 i GAPI 2 NPHI CNAV 68 i PU-S 3 FUCT CNAV 68 I CPS 4 NUCT CNAV 68 I CPS 4 4 38 995 99 1 4 4 38 995 99 1 4 4 38 995 99 1 4 4 38 995 99 1 16 * DATA RECORD (TYPES 0) 1006 BYTES * Total Data Records: 22 Tape File Start Depth = 10085.000000 Tape File End Depth = 9540.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code= 68 10912 datums Tape Subfile: 5 45 records... Minimum record length~ 62 bytes Maximum record length= 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9555.0 2435 9568.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (PT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PCH' PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (PT): LOGGER'SCASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): STOP DEPTH 10064.5 10077.5 THERMAL SANDSTONE 0.00 12.250 09-FEB-96 FSYS REV. J001 VER. 1.1 1421 09-FEB-96 10291.0 10067.0 9575.0 10065.0 900.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8220XA 2435XA 0.000 10334.0 0.0 SEAWATER 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS } = 15 FAR COUNT RATE HIGH SCALE (CPS): 415 NEAR COUNT RATE LOW SCALE (CPS): 90 NEAR COUNT RATE HIGH SCALE (CPS): 590 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 1. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : J-03 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod I GR 2435 68 i GAPI 2 CNC 2435 68 i PU-S 3 CN 2435 68 I PU-L 4 LSN 2435 68 i CPS 5 SSN 2435 68 i CPS 6 CCL 2435 68 1 7 SPD 2435 68 I F/MN 8 TEN 2435 68 i LB 4 4 43 310 01 1 4 4 43 995 99 1 4 4 43 890 01 1 4 4 43 334 31 1 4 4 43 334 30 1 4 4 43 150 01 1 4 4 43 636 99 1 4 4 43 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 77 Tape File Start Depth = 10085.000000 Tape File End Depth = 9549.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 30218 datums Tape Subfile: 6 152 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9544.0 2435 9556.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10063.5 10076.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PCM PCM/CCL GR GAMMARAY CN COMPENSATED NEUTRON $ BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 0.00 12.250 09-FEB-96 FSYS REV. J001 VER. 1.1 1457 09-FEB-96 10291.0 10067.0 9575.0 10065.0 900.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8220XA 2435XA 0.000 10334.0 0.0 SEAWATER 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 15 FAR COUNT RATE HIGH SCALE (CPS): 415 NEAR COUNT RATE LOW SCALE (CPS): 90 NEAR COUNT RATE HIGH SCALE (CPS): 590 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 2. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : J-03 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units I GR 2435 68 1 2 CNC 2435 68 1 3 CN 2435 68 1 4 LSN 2435 68 1 5 SSN 2435 68 1 6 CCL 2435 68 1 7 SPD 2435 68 1 8 TEN 2435 68 i API API API API Log Crv Crv Size Length Typ Typ Cls Mod GAPI 4 PU-S 4 PU-L 4 cPS 4 cPs 4 4 F/MN 4 LB 4 4 43 310 01 1 4 43 995 99 1 4 43 890 01 1 4 43 334 31 1 4 43 334 30 1 4 43 150 01 1 4 43 636 99 1 4 43 635 99 i 32 * DATA RECORD (TYPES O) Total Data Records: 78- 1014 BYTES * Tape File Start Depth = 10084.000000 Tape File End Depth = 9540.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 30506 datums Tape Subfile: 7 153 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 8 is type= LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9555.0 2435 9567.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) = TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): STOP DEPTH 10063.5 10076.5 09-FEB-96 FSYS REV. J001 VER. 1.1 1533 09-FEB-96 10291.0 10067.0 9575.0 10065.0 900.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8220XA 2435XA 0.000 10334.0 0.0 SEAWATER 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 12.250 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 15 FAR COUNT RATE HIGH SCALE (CPS): 415 NEAR COUNT RATE LOW SCALE (CPS): 90 NEAR COUNT RATE HIGH SCALE (CPS): 590 TOOL STANDOFF (IN): REMARKS: PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : J-03 : PRUDHOE BAY : NORTH SLOPE : ALASKA 0.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod I GR 2435 68 i GAP I 2 CNC 2435 68 i PU-S' 3 CN 2435 68 i PU-L 4 LSN 2435 68 i CPS 5 SSN 2435 68 i CPS 6 CCL 2435 68 1 7 SPD 2435 68 i F/MN 8 TEN 2435 68 i LB * DATA RECORD (TYPE# 0) 4 4 43 310 01 1 4 4 43 995 99 1 4 4 43 890 01 1 4 4 43 334 31 1 4 4 43 334 30 1 4 4 43 150 01 1 4 4 43 636 99 1 4 4 43 635 99 1 32 1014 BYTES * Total Data Records: 77 Tape File Start Depth = 10084.000000 Tape File End Depth = 9548.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = 'Feet **** FILE TRAILER ****~ LIS representation code decoding summary: Rep Code: 68 49524 datums Tape Subfile: 8 152 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 9 is type= LIS 96/ 2/23 01 **** REEL TRAILER **** 96/ 2/26 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 26 FEB 96 2:34a Elapsed execution time = 29.23 seconds. SYSTEM RETURN CODE = 0 LVP OlO,H02 VERIFICATION ** REFL HEADER SERVICE NAME :$ERVIC DATF :83/05/27 ORIGIN : REEL NAME :222303 CONT]NI!ATION ~ PPEVIOU$ REEL COMME~!TS ~I.,IBRARY TAPE ** TAPE HEADER ** DATE t83/05/27 ORIGIN :0000 TAPE NAME ~8313 ONTI~i:ATIC)N # REvIoUS TAPE COMmEnTS :LTBRARY TAPE ** FILE HEADER FILM LAME :SERVIC,O0J. SERVlCF NAME ~TE : ~AXIMU~ LFNGTM : ~024 FILE TYPE PREVIr)I1S rILE : ** ]MFOP~ATTON RKCOPD$ CONTENTS C~.~ ,' SaHIO Al, ASEA w~ ~ J' 3 FI~,~ : PRUDHGE BAY RANG: J3E w' SECT~ COON: N. SLOPE MTATI ALASKA CT~Y: USA ********** EOF COMPh E.T~ OL~,U ~ . NY ::::::::::::::::::::::::::::::::::::::::: :. ::~: :::: ~ :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: .~.: .:' .~ 600 0'0'0 0'04 0'65 :~::': ~<~:..~:: ;~:::: ~..: ~ :~: ~-:: . .... 0'o0 000 ~08 065 000" oo0 004 065 :::::::.:,:::: ":::::: - . :::::::::::::::::::::::::::::: ::::::::::::::::::::::::::: ::.: ::: : :_.:: **********************************-***************************** , ALASKA CO~PUTIN'G ' CENTER CO~PAN~ : SOHIO ALASKA PETRObEUN CO~PANY FIELD = PRt)DHO~ ~AY C 0 U N T Y = N 0 R-TH~:'sLOPE STATE = ~.LASKA JOB ~[]~BER AT ACC: 68313 bOP: HCH CASING , . . TYPE FLU FLUIP LEVEL = PULL ****************************** LVP O1C.H02 VERIFICATION LISTING , * COMPFNSATED NM'U~CJN :~ * GA~,~A RAY bOG (GR) , ****************************** SIZE ** DATA FORMAT RECORD EMTRY ~LOCKS TYPE 9 O DATUM SPECIFICATION BI~OCKS M~,~E~ S~:PVICK SERVICe< [}~,~IT APl 4PI AP1 AP1 FILE SIZK PROCESS S~PbE REPR DEPT FT 0 0 0 0 0 4 0 ~ 68 ~T PS1 0 42 I O' 0 4 0 I 68 R~R A PS 1 0 0 ::~.::: ::~:0::.'::~'~~ ~?:: ~::. ~ ':: :'::~ :,:::: ~:: :. - NCnb P~jl CPS 0 34 9'2 0 0 4' 0' ' i ' 68 ~ C N L P ~ i C P ~ 0 ':-~.4~: "~/':- :~:: :~:... :::::::::::::::::::::::::::: : J:~J: ::?~ ::'. :: :.: - · GR PSi GAP] 0 ]1' 3~ 0 0 4 O' i 6'~ NRAT PS2 0 42 1 0 0 4 0 i 6~ R N R A P S 2 0 O. :.-:::: :::: .: ::?' ~: :' ::::~:~:. :: :: ':: ; NCNb, PS2 CPS 0 34 92 O 0 4 0 1 68 GR PS2 GAPI 0 '31 32 0 ..... 0 4 0 I 68 NRAT PS3 0 42 ' I 0 0 4 0 i .... 68 ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: .::~ ::.:...::- .:-_ G~ · ~ DAT~ DEPT NCNL NRAT G~ NCNL DEPT NCNL NRAT NCNL DEPT NCNL NRAT GR NCNL DEPT C~L RAT NCNL NCNL NRAT NCNL DEPT NCNL NRAT NCNL DEPT NCNL NRAT G~ NCNL DEPT NRAT GR NCNL PS3 G.AP~ 0 31 3~ 0 O' 4 0 I 68 -999 ~50o FCNL -999,2'5'00 ~R ......... .,' 999 ~'"~"~O"0' NPHI .,;.999'2500 -999 2500 NP~T 53, ~6'45 NRA~ 7 ~'68~"~ ..... R~'R~ 7 ~08'59 N -999.2500 FCNL -999 2~'~'6" ~ ,~9'99'~"~"500 ~PH~ 37;79'30 41,8125 NPHI 37 i582 ~'~T ~ ~"~'"~'44 RNR~ 5,2500 4 FCNI, ] 81 ~ 0000 ~'r !'9','125'0 ~PHl 23.4.32031445 3461 000i 18 5469 bVP 010,H02 VMRIFICATION LISTIN~ DEPT ~490.5000 NPNI NCNL :999,2500 FCNb -999 NRAT 999,2500 RN~'A GR -g99,~00 NPHI 50 NCNL 2366.0600 FCNL ** FILE TRAII, F.R ** FILE .NA ~E :SERVIC, OOi SERVICE ~AME : DATE : MAXIM~ LENGTW : ~0~4 FILE TYPE 250 0 O0 GR '999 2500 MDHI -999 2500 25 ...... ,, 4~95 ~; . ' 7,398'4 RNRA 6,7578 ** TAPE TRAILER ** MERVIC~ NAME. :BERVIC DATE :H3/nS/27 ORIGIN :0000 TAPE ~'~ A ~ E :8313 CONTIM[IAT~ON ~ NEXT TAPE NAME ~ COMMED~T8 ~LIBRARY ** mFFI, TRAILER 8ERr!CE NAME ~SERVIC D!T~ :83/05/~7 ORIGIN : REEL NA~E CONTINUATION ~FXT.~FEb NAME OM,E, TS :LIBRA Y TAPE 11 000000 il o00000 1111 O0 O0 1111 O0 O0 11 O0 0000 11 O0 0000 11 O0 O0 O0 11 O0 O0 O0 1! 0000 O0 11 0000 O0 11 O0 O0 11 O0 O0 111111 000000 11111t 000000 7777777777 7777777777 77 77 77 77 77 77 77 77 77 77 77 77 00o000 000000 O0 O0 O0 O0 O0 0000 O0 0000 O0 O0 O0 O0 OO OO 0000 OO 0000 O0 O0 O0 O0 O0 000000 000000 7777777777 7777777777 77 77 '77 77 77 77 77 77 77 77 77 77 666666 11 666666 11 66 1111 66 1111 66 I1 66 11 66666666 11 66666666 11 66 66 11 bb 66 11 66 66 11 6~6.66666_~6 ............ 11_ 111111 666666 111111 22 22 222222 222222 22 22 22 22 22 22 22 22 22 2'222222222~ 2222222222 11 11 1111 1111 11 11 11 11 11 11 11 1-1 111111 111111 11 11 1111 1111 11 ll 11 11 li 11 11 11 111111 111111 CCCC M ~ CCCC PFPP RRRR C MN Mt< C P P R R C M PI M C P P R R C M M C ..... PPPP RRRR C M M C P R R C M M C P R R CCCC M M CCCC P P R u U DDDD U U D D U U D D U U D D U U D D U U D D UUUUU DDDD H H OOO EEEEE H H U 0 E H H 0 O E HHHHH 0 O EEEE H H O 0 E H H O O E H H OO0 EEEEE *START* USER PCAL [10707,61211] JOB MONITOR 8~S KLIOE40 iNOV-80.*START* *START* USER PCAL [10707,61211] dOB MONITOR SWS KL10E40 NOV-80. *START* SHIP SEQ. 7864 SHIP SEO. 7864 DATE DATE lO-DEC-80 lO-DEC-80 23:0b:10 23:06:10 SSSSSSSS HH HH SSSSSSSS HH HH SS HH MM SS HH HH SS MM HH SS HH HH SSSSSS HHHHHHHHHH SSSSSS HHHHHHHHHH SS HH HH SS HH HH SS HH HH SS HH HH SSSSSSSS HH HH SSSSSSSS HH HH II I1 II II IIII IIII II II II II II ii II II II II Iili IIII PPPPPPPP PPPPPPPP PP PP PP PP PP PP PP PP PPPPPPPP PPPPPPPP PP PP PP PP PP PP TTTTTTTTTT OOOOOO TTTTTTTTTT OOOO(}O TT OO OO TT OO OO mT O0 O0 TT O0 OO TT OO TT O0 OO TT O0 TT O0 (~0 TT 00 OO TT O0 OO TT 000000 TT 0000()0 *START* USE~ PCAb ~Z~,61211] JOB SHIP SEO~ 7fl~4 DAT~ 10-DEC-HO 2):06:10 MONIT(I~ S~S KL10E40 n(Jv ~0. *START* FIbE: DS~H:SHIP-TO<255>[IO~07,61211} CREATED: 10 DEC,80 2~:20:]? PRINTED: 10-DEC-80 23:06:33 O~E~E SWITCHES~ /~IhE:FORT /COPIES~ /SPACING:! /hIMiT:108 /FORMS~MORMAb SHIP TO : S~IPPING INSTRUCTIONS ISSUED lO-DEC-80 21:20 BY CMC PCCC PCCC , VV VV EEEEEEEEEE RRRRRRRR VV VV EEEEEEEEEE RRRRRRRR vV VV EE RR RR VV VV EE RR RR VV VV EE RR RR VV VV EE RR RR VV VV EEEEEEEE RRRRRRRR VV VV EEEEEEEE RRRRRRR~ VV VV EE RR RR VV VV EE RR RR VV VV EE RR RR VV VV EE RR RR V~ EEEEEEEEEE RR RR vv EEEEEEEEEE R~ RR IIIIII IIIIII II II II II II II II II II II IIIIII IIIIII FF~FFFFFFF f FFf FFF~ FF FF FF FF FF FFFFFFFF FFFFFFFF fF FF FF FF FF FF Y~ YY YY YY YY Y¥ YY YY YY YY Y¥ YY YY YY YY YY YY 000000 0000o0 222222 000000 000000 222222 O0 O0 oO O0 22 22 O0 O0 O0 O0 22 22 O0 0000 O0 0000 22 O0 0000 O0 0000 22 O0 O0 O0 00 O0 O0 22 O0 O0 O0 O0 O0 O0 22 0000 O0 000o O0 22 0000 O0 0000 O0 22 O0 O0 O0 O0 22 O0 oO O0 O0 22 000000 0o0000 2222222222 00o000 000000 2222222222 *S~IART* USER PCAL [10707,61212] JOB SHIP SEQ. MUNI~]R SWS KLIOE40 NOV-80. *START* FILE: DSI~.H:'VERIBY 002<057>[10707.61211] CREATED: PRINTED: 10-DEC-80 23.06. 3 QUEUE SWITCHES: FILE:FORT /COPIES:I /SPACING:I /LIMIT:108 /FORMS:NORMAL 7R64 DATE lO-DEC-80 !O-DEC-80 23:05:45 23106110 SCHLUMBERGER COMPUTING CENTER 10707,61211 REEL I'iEADER I,ENGTH: 132 BYTES REEL NAME: P.C.A.L. SERVICE NAME: EDIT REEL CONTINUATION NUMBER: O1 PREVIOUS REEL NAME: C(IMMENTS: LIS FORMAT CUSTOMER TAPE DATE: 80112/10 TAPE HEADER LENGTH: 1.32 BYTES TAPE NAME: 61211 SERVICE NAME: EDIT TAPE C(.)NTINUATIUN NUMBER: PRE'VIOUS TAPE NAME: C~MMENTS: TAPE COMMENTS DATE LOGGED 21-NO~-80/RUN BlT Ol DATE: 80/12/10 ONE/DEPTH DRILLER SIZE 1244 SURF-TD/CASING 7" 29# SURF-9427 FILE HEADER LENGTH: 62 BYTES FILE NAME: EDIT .001 MAXIMUM PHYSICAL RECORD LENGTH: P~EVlOUS FILE NAME: FILE COMMENTS NON~ 1024 BYTES 10356/TYPE FLUID CRUDE/ 9.625 47# SURF-TD/ WELL SITE LENGTH: C[)MPANY: WELl,: FIELD: C()UNT~: STATE: IN[.ORMATION ~ECORD I ] i~ BYTES SOHIO ALASKA PETRO. J-3 PRUDHOE BAY N. SLf3PE ALASKA CO. DATA ~(3I~MAT SPECIP'ICATI(iN I,ENGTH: 650 BYTES TYPE 0 SIZE REP CODE ENTRY ! 66 0 DATUM SPECIFICATIf)N BLOCKS: ENTITY IC T,OOL I DEPT 2 GP CNL ~] NPNI CNL 4 N[~AT CNL 5 NCNL CNL 6 ~CNL CNL 7 GR CNL 8 NPHI CNL q NRAT CNL .{ 0 NCNL CNL 1 1 ~'CNL CNL I 2 GR CNL 1 ~] NPHI CNL { 4 NRAT CNL 15 NCNL CNL ! 6 FCNL CNL SVORD# UNITS API AP1 AP1 API FILE# SIZE EXP PROC SAM REP DEPT SHIFT FT 0 0 0 0 0 4 0 0 1 68 0 0 GAPI 42 31 32 0 0 4 0 0 1 68 0 0 PU 42 68 2 0 0 4 0 0 1 68 0 0 C/C 42 42 1 0 0 4 0 0 1 68 0 0 CPS 42 34 92 0 0 4 0 0 1 68 0 0 CPS 42 54 93 0 0 4 0 0 1 68 0 0 GAPI 42 31 32 0 0 4 0 0 1 68 0 0 Pt{ 42 68 2 0 0 4 0 0 1 68 0 0 C/C 42 42 1 0 0 4 0 0 I 68 0 0 CPS 42 ]4 92 0 0 4 0 0 1 68 0 0 CPS 42 34 93 0 0 4 0 0 I 68 0 0 GAP! 42 31 32 0 0 4 0 0 1 68 0 0 PU 42 68 2 0 0 4 0 0 1 68 0 0 C/C 42 42 I 0 0 4 0 0 1 68 0 0 CPS 42 34 92 0 0 4 0 0 1 68 0 0 CPS 42 34 93 0 0 4 0 0 1 68 0 0 DEPTD 10100.000 10000.000 9900.000 qSO0,O00 9700.000 9600.000 0500.000 q499.500 MNEMONIC GR FCNL NCNb NRAT GR FCNL NCNb NRAT GR FCNL NCNb NRAT G}~ FCNL NCNb NRAT GR FCNL NCNb NRAT GR FCNL NCNb NRAT GR FCNL NCNb NRAT GR FCNL NCNb NI~AT VALUE 5.100 0.429 0.000 0.000 14.300 24.882 48.477 2.072 15. 900 .054 2.180 i6,300 20.592 51.051 2.472 53.800 29.172 57.486 2.116 26.300 36.894 65.208 1.820 37.500 12.012 40.755 3.232 37.500 12,012 39.039 3.098 MNEMONIC NPHi GR ~'CNL NCNb NPHI GR FCNL NCNL NPHI GR FCNL NCNb NPHI GR FCNL NCNb NPHI GR FCNL NCNb NPHi GR FCNL NCNb NPHI GR FCNL NCNb NPHI GR ~CNL NCNb VALUE 0.000 5.100 0.429 0.000 21.020 17.100 24.882 50,622 21.740 1 700 54.054 26.~00 16.,00 21.,450 51,051 19.260 54.200 27.456 57.915 14.520 24.900 34.]20 66.066 45.740 4o: oo 11 83 ]8.610 47.48O 41.200 12 012 MNEMONIC NRAT NPHI GR FCNL NRAT NPHI GR FCNL NRAT NPHI GR ~'CNL NRAT NPHI GR FCNL NRAT NPHI GR FCNL NRAT NPHI GR FCNb NRAT NPHI GR FCNL NRAT NPHI GR FCNL VALU O. O. -10. O. . 19. 16. 25. . 23. 16. 23. . 27. 17. 20. . 20. 61. 26. . 13. 27. 35. . 52. 41. 11. . 47. 39. 12. 000 000 800 429 130 020 100 311 138 020 9OO 595 384 180 200 592 016 140 100 598 832 980 900 178 240 460 5OO 583 268 240 000 441 MNEMONIC NCNb NRAT NPHI NCNb NRAT NPHI NCNb NRAT NPHI NCNb NRAT NPHI NCNb NRAT NPHI NCNb NRAT NPHI NCNb NRAT NPHI NCNb NRAT NPHi VALUE 0.429 O.0O0 0.000 49.764 1.990 19.180 54.054 2.234 21.100 51.480 2.452 28,440 56.199 2.048 20.780 6b.495 1,818 14.220 37.323 3.406 46.620 39.488 3.266 46.060 DATA P_ECORDS LENGTH OF RECORDS: 966 BYTES LENGTH OF LAST RECORD: 134 BYTES FII~E TI~AILER LENGTH: 62 BYTES FILE NADE: EDiT .001 MAXIMUM PHYSICAL RECORD LENGTH: NEXT FILE NAME: TRAILER LENGTH: 132 BYTES TAPE NAME: ~1211 SERVICE NANE: EDIT TAPE Cf)NTINUATION NUMBER: O1 NEXT TAPE NAME: COMMENTS: 1024 BYTES DATE: 80/12110