Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
210-095
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-04A Mill CIBPs Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-095 50-029-20072-01-00 12158 Intermediate Intermediate Intermediate Scab Liner Liner 9028 2096 4314 10244 10245 2913 10362 16" 13-3/8" 10-3/4" x 9-5/8" 7" 3-1/2" x 3-3/16" x 2-7/8" 8763 20 - 2116 18 - 4332 16 - 10260 15 - 10260 9965 - 12158 20 - 2116 18 - 4244 16 - 8677 15 - 8677 8417 - 9028 10360, 10621, 12147 1950 2090 7020 10530 10362 3450 3580 8160 10160 9980 - 12120 4-1/2" 12.6# 13Cr80 14 - 9987 8430 - 9020 Surface 2252 20" 22 - 2274 22 - 2274 1530 520 4-1/2" HES TNT Packer 9844 8314 Torin Roschinger Operations Manager Leif Knatterud leif.knatterud@hilcorp.com 907-564-4667 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 14 - 8436 N/A N/A 538 Well Not Online 67613 18 0 0 1220 300 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed 9844, 8314 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Gavin Gluyas at 3:20 pm, Sep 22, 2025 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.09.22 14:48:22 - 08'00' Torin Roschinger (4662) J.Lau 11/6/25 RBDMS JSB 092525 ACTIVITY DATE SUMMARY 9/13/2025 SLB CTU #8- 1.75" Coil Job Objective: Mill 2 x CBP MIRU and begin weekly BOP test. *** Job In Progress*** 9/14/2025 SLB CTU #8- 1.75" Coil Job Objective: Mill 2 x CBP Complete weekly BOP test. Finish rigging up. MU BOT milling BHA with 2.71" concave junk mill and RIH.Tag CBP at 10145 CTMD (10130 MD, -15' correction). Mill CBP and push down to next CBP at 10220 CTMD (10205 MD). Mill 2nd CBP and push to 10375 CTMD (10360 MD), just above lower CIBP. Dry drift liner to confirm clear. POOH. Make up 2.73" x 11.05' NS Whipstock drift BHA and RIH. Tag PBTD at 10,375' with no issues. FP coil and well while POOH. RDMO to maintenance. *** Job Complete *** 9/15/2025 ***WELL S/I ON ARRIVAL*** RAN 3-1/2" BLB, 2.50" GAUGE RING TO CIBP @ 10365' SLM DRIFTED 3-1/2" GR, 20' 2.74" DMY WHIP STOCK, S/D HIGH @ 10,220' SLM B&F w/ 3-1/2'' BLB, 2.64'' G-RING, BRUSHED TBG HEAVILY FROM ~10100' SLM TO 1O360' SLM, (t-bird pumped total 176bbl diesel) DRIFTED 3-1/2" GR, 20' 2.74" DMY WHIP STOCK, S/D HIGH @ 10218' SLM, WORK TO 10260' SLM (sheared off & left) RUNNING 3-1/2'' GS(cont on next day) ***WSR CONT 9-16-25*** 9/15/2025 T/I/O=200/0/400 Temp=S/I (Assist SL with pump down) Pumped 176 bbls of DSL down the TBG to assist S-Line in a brush and flush. ******WSR Continued on 9-16- 2025***** 9/16/2025 ****WSR Continued from 9-15-2025***** (TFS uint 1 Assist S-Line with pump down) Pumped 22 bbls of DSL down the TBG to assist S-Line get to depth. Well left in S- Line control. Final WHPS 200/0/400 9/16/2025 ***WSR CONT FROM 9-15-25*** MADE MULTIPLE ATTEMPTS TO DRIFT LINER FREELY(unsuccessful) ***WELL LEFT S/I ON DEPARTURE, PAD-OP NOTIFIED OF STATUS*** Daily Report of Well Operations PBU B-04A 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ___________________ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address: Stratigraphic Service 6. API Number: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool?PBU B-04A Yes No 9. Property Designation (Lease Number): 10. Field: PRUDHOE PRUDHOE OIL 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 12158 10362, 10621, 12147 Casing Collapse Conductor Surface 520 Intermediate Intermediate 1950 Intermediate Scab Liner 5410 / 7020 Liner Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Ryan Ciolkosz Sean McLaughlin Contact Email: ryan.ciolkosz@hilcorp.com Contact Phone:907-224-4357 Authorized Title: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng Driling Manager 9028 10130 8562 2420 10130, 10205, 10362 10242 7" 18 - 10260 18 - 8677 7240 / 8160 September 15, 2025 9965 - 121582913 4-1/2" 12.6# 8417 - 9028 4-1/2" HES TNT Packer 20 - 10260 Perforation Depth MD (ft): 21 - 4332 9980 - 12120 10240 3-1/2" x 3-1/4" x 2-7/8" 8430 - 9020 20 - 867710-3/4" x 9-5/8" 80 30" 20" 16" 2251 13-3/8"4311 2094 MD 3450 153023 - 2274 22 - 2116 21 - 4224 23 - 2274 22 - 2116 Length Size Proposed Pools: 23 - 103 23 - 103 13Cr80 TVD Burst 16 - 9987 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL 028310 BAY 210-095 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 50-029-20072-01-00 Hilcorp North Slope, LLC AOGCC USE ONLY Tubing Grade: Tubing MD (ft): 9844 / 8314 Perforation Depth TVD (ft): Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov Set Whipstock By Grace Christianson at 7:57 am, Aug 21, 2025 Digitally signed by Sean McLaughlin (4311) DN: cn=Sean McLaughlin (4311) Date: 2025.08.20 16:01:56 - 08'00' Sean McLaughlin (4311) 325-495 10-407 *Variance as per 20 AAC 25.112(i): Approved for alternate abandonment plug placement on parent well contingent upon fully cemented liner on upcoming sidetrack. *Window milling on service coil not approved on 10-403, refer to sidetrack PTD for approval. DSR-9/9/25JJL 08/22/25 SFD 9/5/2025JLC 9/10/2025 Gregory C Wilson Digitally signed by Gregory C Wilson Date: 2025.09.10 14:05:06 -08'00'09/10/25 RBDMS JSB 091125 To: Alaska Oil & Gas Conservation Commission From:Ryan Ciolkosz Drilling Engineer Date: August 20, 2025 Re:B-04A Sundry Request Sundry approval is requested to set a whipstock in the B-04A wellbore as part of the drilling and completion of the proposed B-04B CTD lateral. Proposed plan: See B-04A Sundry request for complete pre-rig details - Prior to drilling activities, coil will mill two CBPs and push to bottom, slickline will drift for a whipstock, and E-line will set a 3-1/4" whipstock. Coil will mill window pre- rig. If unable to set the whipstock or mill the window pre-rig, the rig will perform that work. A coil tubing drilling sidetrack will be drilled with the Nabors CDR3 rig. The rig will move in, test BOPE and kill the well. If unable to pre-rig, the rig will set the 3-1/4" whipstock and mill a single string 3.80" window + 10' of formation. The well will kick off drilling in Ivishak Zone 4. The lateral will land and continue in Zone 2 to TD. The proposed sidetrack will be completed with a 2-3/8” 13Cr solid liner, cemented in place and selectively perforated post rig (will be perforated with rig if unable to post rig). This completion will completely isolate and abandon the parent Prudhoe Pool perfs. 20 AAC 25.112(i) Variance Request: Hilcorp requests to plug the existing perforations via the liner cement job, packer whipstock and/or liner top packer, if the liner lap pressure test fails as an alternate plug placement. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current wellbore and proposed sidetrack is attached for reference. Pre-Rig Work: (Estimated to start in 9/15/2025) 1. Coil : Mill CBPs at 10,130' and 10,205' and push to bottom. 2. Slickline : Whipstock Drift/DMY GLVs 3. E-line : Set 3-1/4" Packer Whipstock at 10,341' MD @ 0 deg RHOS 4. Coil : Mill 2.74" Window 5. Valve Shop : Pre-CTD Tree Work 6. Operations : Remove wellhouse and level pad. Rig Work: (Estimated to start in October 2025) x Reference B-04B Permit submitted in concert with this request for full details. 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,420 psi). Give AOGCC 24hr notice prior to BOPE test. 2. Mill 2.74” Window (if not done pre-rig). 3. Drill build section: 3.25" OH, ~483' (31 deg DLS planned). 4. Drill production lateral: 3.25" OH, ~1729' (12 deg DLS planned). Swap to KWF for liner. 5. Run 2-3/8” 13Cr solid liner 6. Pump primary cement job*: 15 bbls, 15.3 ppg Class G, 1.24 (ft3/sk), TOC at window. If high losses are encountered during cement job and it is deemed necessary, a cement down squeeze from TOL to loss zone will be performed with the rig or service coil (if performed by service coil see future sundry). 7. Only if not able to do with service coil extended perf post rig – Perforate Liner 8. Freeze protect well to a min 2,200' TVD. ,p yp This completion will completely isolate and abandon thepg( p parent Prudhoe Pool perfs. Max 15' of open hole - JJL 9. Close in tree, RDMO. * Alternate plug placement variance request per 20 AAC 25.112(i) Post Rig Work: 1. Valve Shop : Valve & tree work 2. Service Coil : Post rig RPM and perforate (~30’) 3. Slickline : set LTP, set live GLVs. Ryan Ciolkosz CC: Well File Drilling Engineer Joe Lastufka 907-244-4357 12344' 10274 Well Date Quick Test Sub to Otis Top of 7" Otis Top of Annular C L Annular Bottom Annular CL Blind/Shears CL 2.0" Pipe / Slips B6 B5 B8 B7 Choke Line Kill Line CL 2-3/8" Pipe / Slip CL 2.0" Pipe / Slips TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level CDR3-AC BOP Schematic CDR3 Rig's Drip Pan Fill Line Normally Disconnected 2" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2.0" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2.0" Pipe/Slips 2-3/8" Pipe / Slip neceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-04A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-095 50-029-20072-01-00 12158 Intermediate Intermediate Intermediate Scab Liner Liner 9028 2096 4314 10244 10245 2913 10130 16" 13-3/8" 10-3/4" x 9-5/8" 7" 3-1/2" x 3-3/16" x 2-7/8" 8562 20 - 2116 18 - 4332 16 - 10260 15 - 10260 9965 - 12158 20 - 2116 18 - 4244 16 - 8677 15 - 8677 8417 - 9028 10362, 10621, 12147 1950 2090 7020 10530 10130, 10205, 10362 3450 3580 8160 10160 9980 - 12120 4-1/2" 12.6# 13Cr80 14 - 9987 8430 - 9020 Surface 2252 20" 22 - 2274 22 - 2274 1530 520 4-1/2" HES TNT Packer 9844 8314 Torin Roschinger Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 14 - 8436 N/A N/A 587 477 61496 47412 7 7 200 200 1300 1060 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed 9844, 8314 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 11:01 am, Nov 25, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.11.23 09:58:47 - 09'00' Torin Roschinger (4662) WCB 2-7-2025 RBDMS JSB 112724 DSR-12/16/24 ACTIVITY DATE SUMMARY 11/19/2024 ***WELL S/I ON ARRIVAL*** (SET PLUG / ADPERF) RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH PERFORATE INTERVAL 10098'-10109' WITH 2'' HUNTING TITAN RTG 6spf 60 DEG PHASE CCL TO TOP SHOT=11.6' CCL STOP DEPTH= 10086.4'. PERFORATE INTERVAL 10109''-10119' WITH 2'' HUNTING TITAN RTG 6spf 60 DEG PHASE CCL TO TOP SHOT=11.6' CCL STOP DEPTH=10097.4 ' SET 2.73" OD NS COMPOSITE PLUG AT 10130', CCL TO MID ELEMENT=15.6' CCL STOP DEPTH= 10114.4'. TAG AFTER SET PLUG AND GUN CORRELATE TO BAKER RPM LOG DATED30-MAY-2017 JOB COMPLETE WELL READY TO POP ***WELL S/I ON DEPARTURE*** Daily Report of Well Operations PBU B-04A PERFORATE INTERVAL 10109''-10119' SET 2.73" OD NS COMPOSITE PLUG AT 10130', PERFORATE INTERVAL 10098'-10109' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-04A Mill CIBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-095 50-029-20072-01-00 12158 Intermediate Intermediate Intermediate Scab Liner Liner 9028 2096 4314 10244 10245 2913 10205 16" 13-3/8" 10-3/4" x 9-5/8" 7" 3-1/2" x 3-3/16" x 2-7/8" 8629 20 - 2116 18 - 4332 16 - 10260 15 - 10260 9965 - 12158 20 - 2116 18 - 4244 16 - 8677 15 - 8677 8417 - 9028 10362, 10621, 12147 1950 2090 7020 10530 10205, 10362 3450 3580 8160 10160 9980 - 12120 4-1/2" 12.6# 13Cr80 14 - 9987 8430 - 9020 Surface 2252 20" 22 - 2274 22 - 2274 1530 520 4-1/2" HES TNT Packer 9844 8314 Torin Roschinger Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 14 - 8436 N/A N/A 343 602 31751 57410 0 13 200 200 1000 1200 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed 9844, 8314 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 1:27 pm, Sep 26, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.09.25 06:59:18 - 08'00' Torin Roschinger (4662) RBDMS JSB 100324 DSR-9/27/24WCB 10-3-2024 ACTIVITY DATE SUMMARY 9/15/2024 LRS CTU 1, 1.5" Blue Coil. Job Objective: Mill CIBP MIRU. Function test BOPs upon installation. Makre up and RIH with 2.700" Venturi Burnshoe milling BHA. ***Job Continued on 9/16/2024*** 9/16/2024 LRS CTU 1, 1.5" Blue Coil. Job Objective: Mill CIBP Continue RIH with 2.700" Venturi Burnshoe milling BHA. Tag CIBP at 10234E/10215M and begin milling. Mill and push CIBP to 10388' ctm (10,362elmd). FP well with 38bbl diesel. Plug was not recovered. RDMO ***Job Complete*** 9/17/2024 ***WELL FLOWING ON ARRIVAL***(perforating) RIG UP HES SLICKLINE UNIT #759 TO DRIFT FOR ELINE. ***CONT'D ON 9/18/24 WSR*** 9/18/2024 ***CONT'D FROM 9/17/24 WSR***(perforating) DRIFTED LINER W/ 33' x 2" DUMMY GUNS(2.29" rings), 2.80" CENT & 1-3/4" SAMPLE BAILER, TAGGED XO @ 10,199' SLM/ 10,209' MD.(no issues, no sample) ***WELL S/I ON ARRIVAL, PAD-OP NOTIFIED OF WELL STATUS*** 9/19/2024 ***WELL S/I ON ARRIVAL*** (SET PLUG / ADPERF) RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH, FUNCTION TEST WLVS PERFORATE INTERVAL WITH 2'' GEO RAZOR 6spf 60 DEG PHASE, 10140'- 10171' CCL TO TOP SHOT=8.1' CCL STOP DEPTH= 10131.9'. CONFIRM SHOTS FIRED. GUN CORRELATE TO BAKER HUGHES RPM LOG DATED 30-MAY-2017 WELL CONTROL DRILL WITH WSL *** JOB CONTINUE 9-20-24*** 9/20/2024 ***JOB CONTINUED FROM 9-19-2024**** ***WELL S/I ON ARRIVAL*** (SET PLUG / ADPERF) RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH SET 2.73" OD CBP AT 10205', CCL TO MID ELEMENT=18.3' CCL STOP DEPTH= 10186.7'. TAG AFTER SET PLUG CORRELATE TO BAKER HUGHES RPM LOG DATED 30-MAY-2017 RDMO YJ ELINE ***WELL SHUT IN ON DEPARTURE*** Daily Report of Well Operations PBU B-04A Tag CIBP at gg 10234E/10215M and begin milling. Mill and push CIBP to 10388' ctm (10,362elmd).gg FP well with 38bbl diesel. Plug was not recovered. RDMO SET 2.73" OD CBP AT 10205', PERFORATE INTERVAL WITH 2'' GEO RAZOR 6spf 60 DEG PHASE, 10140'- 10171' CIBP fish, new CIBP, and adperfs are correctly shown on WBS, below. -WCB` 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-04A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-095 50-029-20072-01-00 12158 Intermediate Intermediate Intermediate Scab Liner Liner 9028 2096 4314 10244 10245 2913 10208 16" 13-3/8" 10-3/4" x 9-5/8" 7" 3-1/2" x 3-3/16" x 2-7/8" 8631 20 - 2116 18 - 4332 16 - 10260 15 - 10260 9965 - 12158 20 - 2116 18 - 4244 16 - 8677 15 - 8677 8417 - 9028 10621, 12147 1950 2090 7020 10530 10208, 10362 3450 3580 8160 10160 9980 - 12120 4-1/2" 12.6# 13Cr80 14 - 9987 8430 - 9020 Surface 2252 20" 22 - 2274 22 - 2274 1530 520 4-1/2" HES TNT Packer 9844 8314 Torin Roschinger Area Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 14 - 8436 N/A N/A 447 374 50621 33802 22 24 200 200 1550 1080 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed 9844, 8314 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 3:55 pm, Aug 15, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.08.15 14:51:49 - 08'00' Torin Roschinger (4662) DSR-8/21/24WCB 10-1-2024 RBDMS JSB 082224 ACTIVITY DATE SUMMARY 7/23/2024 *** WELL S/I ON ARRIVAL*** OBJECTIVE: SET NS 3.5'' PLUG AND PERFORATE INTERVAL W/2 '' GEO RAZOR GUN 6 spf 60 DEG PHASE MIRU YELLOW JACKET E-LINE. PT PCE 250 PSI LOW./3500 PSI HIGH RIH W/CH/1.56'' GUN GAMMA/ MSST SETTING TOOL TO SET PLUG AT 10208' MD CCL TO MID ELEMENT=15' CCL STOP DEPTH=10193' RIH W/CH/1.56'' GUN GAMMA/ 2" GEO DYNAMIC 6 SPF 60 DEG PHASE GUN PERFORATE INTERVAL 10183'-10193' CCL TO TOP SHOT= 7.6' CCL STOP DEPTH=10175.4' CORRALATE FROM RESERVOIR PERFORMANCE MONITOR LOG 30-MAY 2017 JOB COMPLETE RDMO YELLOW JACKET ELINE ***WELL S/I ON DEPARTURE *** Daily Report of Well Operations PBU B-04A CIBP and adperfs are correctly shown on the WBS below. -WCB RIH W/CH/1.56'' GUN GAMMA/ MSST SETTING TOOL TO SET PLUG AT 10208' MD PERFORATE INTERVAL 10183'-10193' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-04A Pull Liner Top Packer Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-095 50-029-20072-01-00 12158 Intermediate Intermediate Intermediate Scab Liner Liner 9028 2096 4314 10244 10245 2913 10362 16" 13-3/8" 10-3/4" x 9-5/8" 7" 3-1/2" x 3-3/16" x 2-7/8" 8763 20 - 2116 18 - 4332 16 - 10260 15 - 10260 9965 - 12158 20 - 2116 18 - 4244 16 - 8677 15 - 8677 8417 - 9028 10621, 12147 1950 2090 7020 10530 10362 3450 3580 8160 10160 9980 - 12120 4-1/2" 12.6# 13Cr80 14 - 9987 8430 - 9020 Surface 2252 20" 22 - 2274 22 - 2274 1530 520 4-1/2" HES TNT Packer 9844 8314 Torin Roschinger Area Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 14 - 8436 N/A N/A 519 531 55242 55069 38 0 200 200 1640 1280 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed 9844, 8314 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.07.18 14:43:09 - 08'00' Torin Roschinger (4662) By Grace Christianson at 3:32 pm, Jul 18, 2024 WCB 9-30-2024 DSR-7/18/24 RBDMS JSB 072524 ACTIVITY DATE SUMMARY 7/1/2024 *** WELL SI ON ARRIVAL*** (PLUG SET / ADPERF) MIRU AKEL PT TO 200 LOW AND 3000 PSI HIGH, FUNCTION TEST WLVS RIH. 1-7/16" FN HEAD/2X 5FT 1-11/16" GUN GAMMA/CCL/2" 10' 6 SPF 60 DEG HSD GUN. WEIGHT 245" LENGTH: 32' MAX OD: 2" UNABLE TO FALL PAST 3723FT. HARD SIT DOWN WITH LESS THAN 70 POUNDS OVERPULL COMING OFF. DECISION MADE TO HAVE SLICKLINE COME OUT TO TROUBLESHOOT RDMO AKEL *** JOB INCOMPLETE, READY FOR SLICKLINE*** 7/4/2024 ***WELL S/I ON ARRIVAL*** RAN 3.50" CENTRALIZER & 2-1/2" SAMPLE BAILER TO 3,705' SLM, NO SAMPLE, UNABLE TO PASS RAN 3.00" CENTRALIZER & 2-1/2" SAMPLE BAILER TO 3,710' SLM, NO SAMPLE, UNABLE TO PASS RAN 10' X 2" DUMMY GUNS (2.16" rings), SAT DOWN @ 6,634' SLM, ABLE TO PASS, SD @ 9,917' SLM (ltp), UNABLE TO PASS RAN 4-1/2" BRUSH, 3.50" GAUGE RING TO 7,000' SLM, CLEAR, RECOVERED AN ELEMENT PIECE RAN 10' X 2" DUMMY GUNS (2.16" rings) & BOWSPRING CENTRALIZER, SAT DOWN @ 9,917' SLM, UNABLE TO PASS RAN 3.75" SWAGE & 3.70" LIB, SAT DOWN @ 9,914' SLM, IMPRESSION OF FISHING NECK ON LINER TOP PACKER RAN 10' x 2" DMY GUNS (2.16" rings), BOWSPRING CENT & 2.25" LIB, SAT DOWN @ 9,919' SLM. GASH ON SIDE OF LIB; INCONCLUSIVE. RAN TANDEM BOSWPRINGS & 2.25" LIB TO 9919' SLM; MARKS ON SIDES OF LIB, CLEAN FACE. RAN 2.12" TAPERED SWAGE TO 9919' SLM. WORKED TO 9926' SLM (PICKING OFF CLEAN). HARD CHUNKS OF RUBBER IN SWAGE. ***CONTINUED ON 7-5-24*** Daily Report of Well Operations PBU B-04A Daily Report of Well Operations PBU B-04A 7/5/2024 ***CONTINUED FROM 7-4-24*** RAN 10' x 2.0" PUMP BAILER TO 9925' SLM; RECOVERED 1/4 CUP OF RUBBER (METAL MARKS FROM SLIPS). RAN DUAL BOWSPRINGS AND 2.25" MAGNET TO 9920' SLM; RECOVERED CIBP SLIP. RAN DUAL BOWSPRINGS AND 2.25" MAGNET TO 9925' SLM; RECOVERED 2 SLIP SEGMENTS AND PIECE OF RETAINING BAND (FROM 45KB). RAN DUAL BOWSPRINGS AND 2.25" MAGNET TO 9925' SLM, NO RECOVERY RAN 2" PUMP BAILER TO 9,925' SLM, RECOVERED 3 SMALL PIECES OF ELEMENT RAN DUAL BOWSPRINGS AND 2.25" MAGNET TO 9925' SLM, NO RECOVERY RAN DUAL BOWSPRINGS AND 2.23" LIB TO 9925' SLM, SHOWS ANOTHER SLIP RECOVERED 45 KB LINER TOP PACKER FROM 9,922' SLM, MISSING ALL SLIPS & ALL BUT 3/4 OF AN ELEMENT, RING FROM CIBP WEDGED INSIDE, REST OF CIBP STILL IN HOLE. RAN 3 1/2" BRUSH, AND 2.25" MAGNET TO 10,609' SLM; RECOVERED 4 SMALL PIECES OF CIBP. RAN 4 1/2" BRUSH AND 3.50" MAGNET TO DEP SLEEVE @ 9927' SLM; NO RECOVERY. ***WSR CONTINUED ON 7-6-24*** 7/6/2024 ***CONTINUED FROM 7-5-24*** RAN 3 1/2" BRUSH AND 2.25" MAGNET TO DEVIATION @ 10,617' SLM; NO RECOVERY. RAN TANDEM BOWSPRINGS AND 2.25" LIB TO DEVIATION @ 10,621' SLM; NO IMPRESSION. DRIFTED CLEANLY W/ 10' x 2" DUMMY GUNS (2.16" RINGS) TO DEVIATION @ 10,611' SLM. RAN READ 24 ARM CALIPER FROM DEVIATION @ 10,612' SLM TO SURFACE, GOOD DATA ***WELL S/I ON DEPARTURE*** 7/15/2024 ***WELL SHUT IN ON ARRIVAL*** T/IA/OA=2400/200/260 RIG UP AKE PCE FUNCTION TEST WLV'S PT 250 L 3000 H RIH WITH NS 2.50" CIBP SET NS CIBP @ 10362' CCL STOP DEPTH= 10348.2 (CCL-ME=13.8') CORRELATE FROM RESERVOIR PERFORMANCE MONITOR LOG 30-MAY-2017 T/IA/OA=2400/200/260 JOB COMPLETE ***WELL SHUT IN ON DEPARTURE NOTIFY PAD OP*** RIH WITH NS 2.50" CIBP SET NS CIBP @ 10362' RECOVERED 45 KB LINER TOP PACKER FROM 9,922' SLM, MISSING ALL SLIPS & ALL BUT 3/4 OF AN ELEMENT, RING FROM CIBP WEDGED INSIDE, REST OF CIBP STILL IN HOLE. RAN 3 1/2" BRUSH, AND 2.25" MAGNET TO 10,609' SLM; RECOVERED 4 SMALL PIECES OF CIBP. 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-04A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-095 50-029-20072-01-00 12158 Surface Intermediate Intermediate Scab Liner Liner 9028 2096 4314 10244 10245 2913 10350 16" 13-3/8" 10-3/4" x 9-5/8" 7" 3-1/2" x 3-3/16" x 2-7/8" 8753 20 - 2116 18 - 4332 16 - 10260 15 - 10260 9965 - 12158 20 - 2116 18 - 4244 16 - 8677 15 - 8677 8417 - 9028 12147 1950 2090 7020 10530 10350 3450 3580 8160 10160 9980 - 12120 4-1/2" 12.6# 13Cr80 14 - 9987 8430 - 9020 Conductor 2252 20" 22 - 2274 22 - 2274 1530 520 4-1/2" HES TNT Packer 9844 8314 Torin Roschinger Area Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 14 - 8436 N/A N/A 401 1128 48575 51900 34 12 200 150 898 1523 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed 9844, 8314 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 2:05 pm, Jun 17, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.06.17 13:58:25 - 08'00' Torin Roschinger (4662) RBDMS JSB 062024 ACTIVITY DATE SUMMARY 6/13/2024 *** WELL SI ON ARRIVAL *** T/I/O = 2450/200/50 ELINE RUNS NS X REACH CIBP, SET AT 10350 FT, OFFSET 14.4 FT, CCL STOP 10335.6 FT TAGGED, GOOD INDICATION PERF 10213-10244 FT, 2", 6 SPF, 60 DEG. 2500 PSI, NO CHANGE, ALL SHOTS FIRED. T/I/O = 2500/200/50 *** WELL SI ON DEPARTURE, DSO NOTIFIED TO POP *** Daily Report of Well Operations PBU B-04A Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 6/12/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20240612 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# MPI-06 50029228220000 197195 5/2/2024 READ Caliper Survey MPI-09 50029229640000 200103 5/2/2024 READ Caliper Survey PBU B-04A 50029200720100 210095 5/20/2024 HALLIBURTON RBT PBU B-29B 50029215230200 217114 5/20/2024 HALLIBURTON RBT PBU C-26A 50029208340100 198145 5/24/2024 HALLIBURTON RBT PBU D-09A 50029203810100 199085 5/18/2024 HALLIBURTON RBT PBU D-23A 50029207380100 196188 5/18/2024 HALLIBURTON RBT PBU L-295 50029237740000 223115 5/25/2024 HALLIBURTON PPROF Please include current contact information if different from above. T38893 T38894 T38895 T38896 T38897 T38898 T38899 T38900 PBU B-04A 50029200720100 210095 5/20/2024 HALLIBURTON RBT Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.06.12 12:38:22 -08'00' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-04A Mill CIBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-095 50-029-20072-01-00 12158 Surface Intermediate Intermediate Scab Liner Liner 9028 2096 4314 10244 10245 2913 12147 16" 13-3/8" 10-3/4" x 9-5/8" 7" 3-1/2" x 3-3/16" x 2-7/8" 9026 20 - 2116 18 - 4332 16 - 10260 15 - 10260 9965 - 12158 20 - 2116 18 - 4244 16 - 8677 15 - 8677 8417 - 9028 12147 1950 2090 7020 10530 None 3450 3580 8160 10160 9980 - 12120 4-1/2" 12.6# 13Cr80 14 - 9987 8430 - 9020 Conductor 2252 20" 22 - 2274 22 - 2274 1530 520 4-1/2" HES TNT Packer 9844, 8314 9844 8314 Torin Roschinger Area Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 14 - 8436 N/A N/A 259 693 24506 17769 18 1838 650 750 950 920 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 11:30 am, Jul 12, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.07.12 09:53:19 -08'00' Torin Roschinger (4662) RBDMS JSB 071323 DSR-7/12/23 ACTIVITY DATE SUMMARY 6/12/2023 CTU #6 1.75" CT .156" Job Scope: Mill CIBP MIRU. ***Job In Progress*** 6/13/2023 CTU #6 1.75" CT 0.156" Job Scope: Mill CIBP Finish RU. MU 1.69" milling assembly with 2.29" 4-blade junk mill and RIH. Dry tag plug @ 10442'. Begin milling. Become bit stuck after a stall. Not able to fire jars. POH and change out jars. Run back in hole. Tag plug same depth. Begin milling. Very grabby. Try milling with choke closed (stable injectivity: 1300 psi @ 1.3 bpm). Still can't mill without stalling (go straight from zero motor work and zero weight setdown to stall). Try milling with choke open, per Tool Hand (getting sporadic returns). Still can't mill without stalling. Get temporarily bit stuck. Worked free with jars. ***Job In Progress*** 6/14/2023 CTU #6 1.75" CT 0.156" Job Scope: Mill CIBP ***Job Continued from 6/13/23*** Continue attempting to mill CIBP. Stalling as soon as touch plug; not making progress. POH to inspect tools and MU Venturi burnover assembly. MU 1.69¿ milling tools with 2.25¿ Venturi burnover assembly. RIH. Dry tag 10,450¿. PUH and begin milling. Worked down to 10,447¿ and lost forward progress. POOH. Venturi burn shoe full of strip gun pieces. Swapped the motor out for 2-1/8¿ motor, re-run venturi burn shoe 2.25". Tagged 10,450¿ dry. Begin milling **Job Continued on 6/15/23*** 6/15/2023 Coil Unit 6 1.75" Coil Tubing - Job Scope = Mill CIBP ***Job continued from 6/14/23*** Milling with 2.25" venturi burn shoe. Quit making progress 10,449' ctmd. POOH. Freeze protect tubing 38 bbls diesel. Blow the reel down. RDMO. ***Will need to continue cleaning strip gun pieces off of the CIBP if planning on milling the CIBP*** ***Job Suspended*** 6/28/2023 CTU 9, 1.75" 0.156" Job Scope: Mill CIBP MIRU CTU 9. MU YJ 1.69" milling assembly w/ 2.23" venturi/burnshoe. RIH, Dry tag plug, pick up and venturi through liner. Start milling plug, many stalls before making progress, then make very slow progress and positive indication of mill off ***Continue to WSR on 6/29/23*** Daily Report of Well Operations PBU B-04A Daily Report of Well Operations PBU B-04A 6/29/2023 CTU 9, 1.75" 0.156" Job Scope: Mill CIBP Continue milling CIBP making slow/consistant progress. Spinning on plug, POOH to inspect BHA. Venturi packed with strip gun debris and small gun parts. RBIH with venturi/burn shoe milling BHA. Dry Tag CIBP @ 10,454' CTM. PUH start pump got Free Spin 2300 psi then CTP spiked. stop pumping and slowly bleed down. POOH. Motor locked up. Changed motor and RIH. Milled CIBP in hour. Pushing CIBP to PBTD. Landed plug on bottom @ 12158 CTMD. POOH pumping through liner. Not freeze protecting well per pad operator, will be POP-ing well. L/D YJ milling BHA. RDMO ***Continue to WSR on 6/30*** 6/30/2023 CTU 9, 1.75" 0.156" Job Scope: Mill CIBP Finish RDMO ***Job Complete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y Anne Prysunka at 10:57 am, Nov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a%30$7 0$'($127+(5$77(037723$66'(3/2<0(176/($9(:,7+; 63,5$/6+2*81675,3*81VHHORJ :(///()76,5($'<)256/,&./,1( 'DLO\5HSRUWRI:HOO2SHUDWLRQV 3%8%$ 3(5)25$7()520 0' The adperfs are correctly shown on the WBS below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y Samantha Carlisle at 4:46 pm, Mar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a 6/02)&$5%21:,5($/21*: 722/675,1*/()7 ,1+2/( *60$<67,//%(/$7&+(',172%$.(5.%/73 7, $VVLVW6/LFNOLQH3UHSHUI3XPSHGEEOVGRZQ7%* IROORZHGE\EEOVFUXGHWRORDGWEJ5HOHDGHGIURPMRE6OLFNOLQHRQZHOOXSRQ GHSDUWXUH :(//6,21$55,9$/ ILVKLQJ 7%,5'/2$'67%*ZEEOV&58'( ),1'7232):,5(# 6/0%80383Z:+$7$33($5672%(-867 :,5(:(,*+7 :65&217,18('21 'DLO\5HSRUWRI:HOO2SHUDWLRQV 3%8%$ 'DLO\5HSRUWRI:HOO2SHUDWLRQV 3%8%$ :65&217,18(')520 21685)$&(Z:,5(:/9 V127+2/',1*UHFRYHUHGa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a%(/2::/9 6&/26(5$06 ,167$//1,*+7&$3 6:$37281,7%5$,'('/,1( 5(75,(9('833(51'%$,7('$66(0%/< a :,5( :65&217,18('21 58%5$,'('/,1()25),6+,1*236 7,2 $VVLVW6OLFNOLQHZHOONLOO3XPSHGEEOVFUXGHGRZQ7%*WR DVVLVW6OLFNOLQH3XPSHGEEOVGRZQ7%*IROORZHGE\EEOV.&/ 3XPSHGEEOVWR)3VXUIDFHOLQHVDQGWUHH3XPSHGEEOFUXGHIROORZHGE\ EEOVGRZQ7%*IRU)33XPSHGEEOVGRZQ7%*IROORZHGE\ EEOV.&/WRNLOOZHOO3XPSHGEEOVFUXGHDQGEEOVIRU)3-RE FRQWLQXHVQH[WGD\ :65&217,18(')520 ILVKLQJ 5(75,(9('67%$,7('$66(0%/< 5,**(''2:1%5$,'('/,1( 6:$33('72:,5( ),1'7232):,5(# 6/06+($5*621),6+ 675,33('a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mage Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. aI Q - ©q 5 Well History File Identifier Organizing(done) ❑ Two-sided III iIIIII III ❑ Rescan Needed III 11111111 I III TAN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: Greyscale Items: Other, No/Type:Cp NO, . ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: AM Date: 3 /' /s/ I3 Project Proofing I BY: Date: /s/ II Scanning Preparation g. x 30 = 0 + / = TOTAL PAGES Count does not include cover sheet) ni BY: A Date: 4 3 !if jlyi11fD Production Scanning 1111111111 I Stage 1 Page Count from Scanned File: � (Count does include cove sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: Date: 3 /Li. /s/flip ta i Stage 1 If NO in stage 1, page(s)discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. 11111111111 I ReScanned 1111111H I BY: Maria Date: /s/ Comments about this file: Quality Checked 11111111111111111 19M9/9111 1 1Ale11 41■cfe.,, it !^e,.e-De„e,4..,. r _ o E u co o a) N i ' :0- . W N J a c T E in V 0 f0 m J 7 ..T. N Q 2 c N M a T N I CO W 83 0) E Z d >_,E E m W a) �,- m _ CO c c) U I I _ F- HiHh1 �mm "°? — E . ��E m0 m mO Ja >, m E cnN E as 0 m m o a C E 'ao2� >� p a p 2 .N' (7 U) ao a. E Z ° o 002 ao c"p o m 0 O a) a) a o 2? = C o O w E 0 c a a aU. 20 = a 1-a( 2 2XW 2J Oaa 22 2a a o a) c 0 > L a) 0 0 0 0 0 0 0 0 0 0 J I N W N N N N N N N N N N C q � p o & ° v v v v v v v E Q co 2 — C c c c c a) a) C C c C c c c a) a) a) a) a) Co N Cl) Cl) Cl) a) a) N a) 0 " a a a a a co m a a s a a a a r co J x OU O O O O O 0 0 0 O O 0 0 0 0 Ce Q co m a co co LU N. op o )n o o co co co o LU Oz ? CO w - ,_ M M N to v In M M Om O O N cN• N •-- .N- ,. .N- .N- .N- .- .- W as Z N 0 c °v °v oo oo 8 m° CO'o `) °v I) `n °� °v L li a ° ° o ° co rn o) co N co c) WX w J '' V m O 8 C CO ICC II CC Z O. m m O. N O c l ZI T' ow m 0 0 0 0 0 0 � — a) O N a m C) m LU Lo LU Lo U ° J in N In N N N CO 0• i m I J a co I Q 9 9 J U I m ° — 5 Z N a 0 G Q• N J CO Z O w O a u; O c w O rt Q = _ C C CL O. a) C7 Q o a ZI w w > z a) U• co o 0 Z Z Z Z .N ,N ,iq •M 7 7 m 7 N N co N co -0 1 M c� co cn co Q) a) m a) m a) m m Z ' c CO c c CC C CC C Ti a) O O •O •° 0 C C O m O co O m CO v v E v E v E E ! • o ' m m 1 2 2 > > > > E ° E ° E E I Z o a) a) v CO P co v co co °' 0 5 Z Z S 0 c 0 5 0 C) f to N - O J ` o D °) co ff o o m S N E o o v N 2 Z O 0 W O Z N N w O O Q `o o Vie .. O b Q < < J - - O C .0 - ce ea Z_ W p 4 +..1.11 11 \ 1 Q J b O. 3 J F- pW W pW J pW J J J J W J J CC < O O O o rkJ J 9 .T. a) a) a) ..+ 9. O D •c os m CO as T a a• a i to m To c0 Ira co a ° E U al O o f o o E oz-. 2 .0 1-x0 I a N N S J Z• O ,- , -_ C N C C w ;_ a a E m 11''" J u o 0 o 0 Z M M o d d Z Z a. O U E y E d)0 W a) 3 (c Z Ce 0 N N a 0 0 v Um' W a > I J a) U m o a j Z d o H Q O z �- II c J a id - _ •7 Cl. N O c 0 0 �n •o E � � 0 u i 1 ° O a u)E N U) • CO 0 J Q 9 m o 0 I—_ Z o to N TO N CO m r C w• a) t s N o• of Q 2 Q O >• O i > Ca m i C 0 A a a) I Z IIx cc 1 _ c c d o • co > 7 C O rn c c a Z E O o 0 8 —Q o N d 0 >- N E E z v !, w ,_ ir) ' d o cz a I 1-ii! 0 O O N O a) to ++ee1� U U a •T.0 E a `w U o o 00 a) t c aa)) 0 0 d J J 3 Q U Qa' 0 0 =aw f 4" , � 1 rra ION BAKER HUGHES PRINT DISTRIBUTItN LIST COMPANY BP EXPLORATION(ALASKA), INC COUNTY NORTH SLOPE BOROUGH WELL NAME B-04APB1 STATE ALASKA FIELD PRUDHOE BAY UNIT DAIS 11/4/2011 THIS DISTRIBUTION LIST AUTHORIZED BY: Alfredo Martinez 2\D_09'5 SO#3461693 Log CD Log CD Copies Copies Client/ Partners Copies Copies Client/ Partners 2 1 Company BP EXPLORATION(ALASKA), INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD ANCHORAGE,AK 99508 1 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082 A HOUSTON,TX 77002 1 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE. Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Company Company Person Person Address Address GT.° Page 1of1 RECEIVED .all Nov 042011 RAKE a osi& as Cons.Commission www.bakerhughes.com PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION(ALASKA), INC COUNTY NORTH SLOPE BOROUGH WELL NAME B-04A STATE ALASKA FIELD PRUDHOE BAY UNIT DAI L 11/3/2011 THIS DISTRIBUTION LIST AUTHORIZED BY: Alfredo Martinez 50#3461693 Log CD Log CD Copies Copies Client/ Partners Copies Copies Client/ Partners 2 1 Company BP EXPLORATION(ALASKA),INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD ANCHORAGE,AK 99508 1 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082 A HOUSTON,TX 77002 1 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE. Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Company Company Person Person Address Address Page 1 of 1 r a ym N m m am • s.N A g o m d n ' ' ma S m Q 1 9 m I x V N t J < N p A m N F 5 N e I ., 1 m 2 3 o N N -.0 O A N N IJ- = b i g, Ti„ Eau* °y m r n y m m 0 N u c -. nm mn t a c r 23 m N () 2 m mmmmmmmmmmmmm n >0000°30000r° mm -1 CmCCe m comma A A m23 o M r_m m m m m a 0 Z 2;A O o M o 0 N ..oaoo go oos 0 INlNJA0+m NNNd-,N+ Z Z 3 3 3 3 3 3 a xm 2?m o 1 O 00000O rOZAOm a ZZZZZz rOm033 rrrrrrs0000-1r Z Cv - mom C Z 3q�! gyp m m""C o m V 4 p ' 0 .A� ' < g -t 1 1 W 1 ry,Q} O a ruj L 0 , o l F o-•0000000 -N-▪ N 'N r N N+ N 0 N O N O O 4 f O O N O m 0000-.0 0-.-.-.- -. m v Gs MH a / • 1 } I r 4 I o O ANN •�,'P"' OC• n 3 HE m o V w '� o m ill o WE! al 2 .5 Jmt' x<• d• a $'. m W S n oC N i m1 S m ,ice - 00 3 › 3 ill I =, 0 N N W t STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: ®Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ❑Suspended 1b. Well Class: 20AAC 25.105 2OAAC 25.»0 ® Development ❑Exploratory ❑GINJ ❑WINJ ❑WAG ❑WDSPL ❑Other No.of Completions One ❑ Service ❑Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska)Inc. 11/24/2010 210-095 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 11/5/2010 50-029-20072-01-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 11/18/2010 PBU B-04A 741'FNL, 1598'FEL, SEC 31,T11N,R14E, UM 8. KB(ft above MSL): 59.6 15.Field/Pool(s): Top of Productive Horizon: 2216'FSL, 1644'FWL, SEC 29,T11N, R14E, UM GL(ft above MSL): Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 2067'FSL,3230'FWL, SEC 29,T11N, R14E, UM 12147' 9026' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 664034 y- 5949909 Zone- ASP4 12158' 9028' ADL 028310 TPI: x- 667201 y- 5952936 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 668791 y- 5952823 Zone- ASP4 None 18.Directional Survey: ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-DrillLateral Top Window MD/TVD: MWD DIR, GR, RES, MCNL/GR/CCL 10260' 8677' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED See Attached 24. Open to production or injection? ®Yes ❑No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom;Perforation Size and Number): 2"Gun Diameter,6 spf 41/2", 12.6#, 13Cr80 9987'/8435' 9844'/8314' MD ND MD ND 11500'-11720' 9006'-9014' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 11850'-12120' 9009'-9020' DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 2500' Freeze Protect w/38 Bbls of Diesel 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): January 29,2010 Flowing Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 1/29/2011 8 Test Period ♦ 1,264 4,395 275 93 3,478 - Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: •OIL GRAVITY-API(CORR): Press. 550 1,670 24-Hour Rate♦ 3,792 13,186 825 Not Available 28. CORE DATA Conventional Core(s)Acquired? ❑Yes ®No Sidewall Core(s)Acquired? ❑Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology d s nce of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory a 110.071. i UPI None 1!1 J FEB 2 3 2011 RBDMS FEB 2 .2011 � `_ t knife E1:1&G»cons.compigske Form 10-407 Revised 12/2009 CONTINUED ON REVERSE 2,�r / A11Ch0'a(�Bbmit Original Only 3 ,, //., 22, GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Well Tested? ❑Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Top CGL/Zone 3 10300' 8711' None Base CGL/Zone 2C 10394' 8789' 23SB/Zone 2B 10494' 8857' HOT 11675' 9013' 21P 12074' 9011' Formation at Total Depth(Name): 21P 12074' 9011' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. � Signed: Terrie Hubble �fiNt , I}J.L/f6Ct Title: Drilling Technologist Date: t� / /it PBU B-04A 210-095 Prepared By Name/Number. Terrie Hubble,564-4628 Well Number Permit No./Approval No. Drilling Engineer: Sean McLaughlin,564-4387 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 MC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 MC 25.071. Form 10-407 Revised 12/2009 Submit Original Only WELL NAME: B-04A 23. Attachment-Casing,Liner and Cementing Record Casing Setting Depth MD Setting Depth ND Hole Size Wt. Per Ft. Grade Top Bottom Top Bottom Size Cementing Record 30" Stove Pipe Surface 80' Surface 80' 36" —250 sx Cement 20" 133#/94# K-55/H-40 Surface 2274' Surface 2274' 26" 4000 sx Permafrost 16" 65# K-55/H-40 Surface 2116' Surface 2116' 17-1/2" Uncemented 13-3/8" 68#/61# K-55/H-40 Surface 4332' Surface 4244' 17-1/2" 1700 sx Class'G' 10-3/4"x 9-5/8" 55.5#/47# N-80 Surface 10260' Surface 8677' 12-1/4" 1400 sx'G',725 sx'G',400 sx'G',500 sx'G' 7" 29# N-80 6706' 10260' 6033' 8677' N/A 476 sx Class'G' 3-1/2"x3-3/16" 9.3#16.3#/ x 2-7/8" 6.17# L-80 9934' 12158' 8390' 9028' 4-1/4" 124 sx Class'G' North America-ALASKA- BP Page 1 of 1 Operation Summary Report Common Well Name:B-04 AFE No Event Type: MOBILIZATION(MOB) I Start Date: 10/5/2010 End Date: X3-00WM2-C(357,693.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.:NORDIC 2 Spud Date/Time: 10/5/2010 12:00:OOAM Rig Release: l I Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) - (ft) 11/2/2010 12:00 - 22:00 10.00 MOB P PRE RM FROM X-PAD TO B-PAD 22:00 - 00:00 2.00 MOB P PRE POSITION RIG&SPOT OVER WELL B-04 11/3/2010 00:00 - 01:00 1.00 RIGU PRE SPOT RIG EQUIPMENT 01:00 - 01:20 0.33 RIGU PRE PJSM TO NU BOPE 01:20 - 05:00 3.67 BOPSUR PRE tNU BOPE 05:00 - 06:00 1.00 BOPSUR PRE SHELL TEST BOPE SHELL TEST GOOD 06:00 - 07:00 1.00 BOPSUR PRE CREW CHANGE. DISCUSS CURRENT OPERATIONS AND EQUIPMENT STATUS. _ MAKE RIG ROUNDS AND CHECKS. 07:00 - 12:00 5.00 BOPSUR ` l PRE PRESSURE TEST ALL BOP AND RELATED n D I EQUIPMENT. ` t) TEST WITNESSED BY AOGCC W I I REPRESENTATIVE B.NOBLE v- - 12:00 - 15:00 3.00 MOB ! PRE HOLD PJSM. SLIP AND CUT DRILL LINE. Printed 2/22/2011 5:08:52PM North America -ALASKA- BP Page 1 of 24 Operation Summary Report Common Well Name: B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site: PB B Pad Rig Name/No.:NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/3/2010 15:00 - 18:00 3.00 BOPSUR P WEXIT HOLD PJSM. RU DSM LUBRICATOR. 18:00 - 18:30 0.50 BOPSUR P WEXIT CREW CHANGE. PJSM TO PT LUBRICATOR&PULL TWC. '18:30 - 19:00 0.50 BOPSUR P WEXIT PT&CHART LUBRICATOR&PULL TWC WELL SHOWS 0 PSI AFTER TWC WAS PULLED. 19:00 - 19:30 0.50 I BOPSUR P WEXIT PJSM&PASS LUBRICATOR OFF RIG. 19:30 - 19:45 0.25 BOPSUR P WEXIT PJSM TO PU INJECTOR&REHEAD COIL 19:45 - 23:00 3.25 BOPSUR P WEXIT PU INJECTOR&REHEAD COIL WITH SLB CTC &BHI UQC PULL TEST&PT SAME 23:00 - 00:00 1.00 BOPSUR P WEXIT FILL COIL 11/4/2010 00:00 - 00:30 0.50 BOPSUR P WEXIT FILL COIL 00:30 - 02:35 2.08 BOPSUR P ! WEXIT PT PACK OFF,INNER REEL VALVE,CTC,& UQC CHECKS CHARTED TEST ON ALL 02:35 - 02:50 0.25 STMILL P WEXIT PJSM TO MU WINDOW MILLING ASSY 02:50 - 03:45 0.92 STMILL _P WEXIT MU WINDOW MILLING ASSY { • TEST BHI TOOLS @ SURFACE 03:45 - 07:00 3.25 STMILL j P ' WEXIT PJSM W/SLB&NORDIC DRILLERS FOR TRIP INTO HOLE OPEN EDC RIH LOG TIE IN WITH-39'CORRECTION 07:00 - 07:30 0.50 STMILL P WEXIT CREW CHANGE. DISCUSS OPERATIONS AND RIG STATUS. MAKE RIG CHECKS AND ROUNDS. 07:30 - 10:30 3.00 STMILL P WEXIT CONTINUE TO LOG INITIAL GR TIE IN. MAKE ADDITIONAL+4'CORRECTION. DRY TAG TOW AT 10370' 10:30 - 15:00 4.50 STMILL P WEXIT TIME MILL WINDOW FROM 10370'. A 2730 PSI FS AT 2.53 BPM IN. TIME MILL AT 0.1'PER 12 MINUTES TO START OUT SLOWLY. 15:00 - 18:30 3.50 STMILL P WEXIT TIME-MILL AHEAD FROM 10370' 2650 PSI FS AT 2.56 BPM IN/OUT. DHWOB:3-4K# CONTINUE TO MILL AT 0.1'PER 6 MINUTES. BEGINING TO SLOW DOWN AND WOB NOT DRILLING OFF AS FAST. LOTS OF METAL ON MAGNETS. 18:30 - 19:00 0.50 STMILL P WEXIT CREW CHANGE UPDATE KILL SHEET AS PER SOP 19:00 - 22:00 3.00 STMILL P WEXIT MILL AHEAD FROM 10,376.8' FS 2,600 PSI @ 2.5 BPM 20:00=2,750 PSI,3.8K WOB,10,377.3' 21:00=2,730 PSI,3.7K WOB,10,377.8' DRILL TO 10,378.4'MOTOR STALLED OUT •PU TO 10,362'RIH&STALL AGAIN @ 10,3.78.3' 22:00 - 00:00 2.00 STMILL P WEXIT MILL AHEAD FROM 10,378' FS 2,500 PSI @ 2.5 BPM [23:00=2,670 PSI,0.74K WOB,10,379' 00:00=2,700 PSI,1.0K WOB,10,379.8' Printed 2/22/2011 5:09:22PM North America-ALASKA- BP Page 2 of 24 Operation Summary Report ......__-..._._._...-- Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site: PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/5/2010 00:00 - 06:00 6.00 STMILL P WEXIT CONTINUE MILLING WINDOW FROM 10.379.8 FS 2,500 PSI @ 2.5 BPM 01:00=10,380.9'@ 2680 PSI,.78K WOB 02:00=10,382.2'@ 2630 PSI,.63K WOB 03:00=10,382.8'@ 2590 PSI,.65K WOB 04:00=10,383.7'@ 2615 PSI,.54K WOB 05:00=10,384' @ 2680 PSI,.68K WOB [MILL TO 10390'. 06:00 - 06:30 0.50 STMILL P WEXIT CREW CHANGE. DISCUSS RIG AND EQUIPMENT STATUS. FLUIDS, OPERATIONS. MAKE RIG CHECKS AND ROUNDS. CONTINUE TI MILL/DRILL AHEAD. 06:30 - 08:00 1.50 STMILL P WEXIT CONTINUE TO MILL AHEAD. OBSERVING 50% FORMATION CONTENT IN SAMPLES DRILL FORMATION FROM 10383'TO 10393'. 08:00 - 10:00 2.00 STMILL P WEXIT DRESS WINDOW BY BACKREAMING THREE PASSES AT SLOW SPEED(0.1'PER MINUTE). DRY DRIFT WINDOW. VERY SMOOTH. 10:00 - 12:15 2.25 STMILL P WEXIT HOLD PJSM TO DISCUSS TRIP OUT OPEN EDC. CIRCULATE OUT OF HOLE AT 2.31 BPM @ 2318 PSI FS. } HOLD PJSM NEAR SURFACE TO DISCUSS _ HANDLING BHA. 12:15 - 13:30 1.25 STMILL P WEXIT GET OFF WELL. UNSTAB COIL. LD MILLING BHA. WINDOW MILL:3.65 NG, 3.66 GO;STRING REAMER: 3.78 NG,3.79 GO. 13:30 - 14:30 1.00 DRILL P PROD1 MU DRILLING BHA. 2.5 DEG MTR WITH HYC SRX3611M-B4 4.125"BICENTER. NO RESISTIVITY TOOLS. STAB COIL. TEST TOOLS. GET ON WELL. 14:30 - 17:00 2.50 DRILL P PROD1 RUN IN HOLE. MONITOR PIT VOL TO CHECK CAL ON REPLACEMENT PVT SENSORS. 17:00 - 17:30 0.50 DRILL P PROD1 LOG GR TIE IN FROM 9990'. SUBTRACT 37' CORRECTION. _ 17:30 - 19:20 1.83 DRILL P PROD1 DRILL AHEAD FROM 10393'. A� 2550 PSI FS AT 2.45 BPM IN/OUT. 1^ 19:20 - 00:00 4.67 DRILL P PROD1 STALL AT 10409'MD. ATTEMPT TO DRILL S PAST-STALL. ATTEMPT TO TIME MILL PAST -MOTOR STALLS IMMEDIATELY UPON ENGAGING,BEFORE ANY WOB IS NOTED ON BAKER TOOLS. WORK FOR 3 HOURS W/-15 STALLS. FINALLY BEGIN TO WORK PAST 10409'MD. FREESPIN 2.5 BPM AT 2550 PSI. ONLY ABLE TO HOLD-300 LB DHWOB BEFORE STALLING. DRILL AHEAD TO CONFIRM FALLING TREND OBSERVED IN NEAR BIT INCLINATION. CONTINUED ON REPORT 11/06/10. 11/6/2010 00:00 - 02:30 2.50 DRILL P 10,413.98 PROD1 CONTINUED FROM REPORT 11/05/2010. FREESPIN 2.5 BPM AT 2550 PSI. DRILL AHEAD W/-300 LB DHWOB W/FREQUENT STALLS. DRILL AHEAD TO 10414'MD. NEAR BIT INCLINATION SHOWS A FALLING TREND SINCE EXITING WINDOW,SHOULD BE BUILDING. ADDITIONALLY,LAST TWO SAMPLES(10413'MD AND 10414'MD)SHOW -50%TO-60%CEMENT. POOH TO INVESTIGATE LOW ROP/AGGRESSIVE STALLING AND TO ADJUST AKO AS NEEDED. Printed 2/22/2011 5:09:22PM North America -ALASKA- BP Page 3 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA 1 UWI:500292007200 Active Datum:7: 04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:30 - 06:00 3.50 DRILL N DPRB 10,413.98 PROD1 POOH W/BUILD. 06:00 - 06:30 0.50 DRILL N DPRB 10,413.98 PROD1 LD DRILLING ASSY BIT GRADED 2-6,IT APPEARS THAT BHA WAS TRACKING THE CSG BY BIT WEAR 06:30 - 11:00 4.50 DRILL N DPRB 10,413.98 PROD1 CREW CHANGE CHECK BHI DIRECTIONAL TOOLS,TOOLS GOOD SPOKE WITH TOWN.DECIDED TO SET 2ND WS WITH TOWS nfl 10,254'&KICK OFF IN ZONE 4 WITH 0.6 AKO MTR WAIT ON NEW WS&WINDOW MILL 11:00 - 11:30 0.50 WHIP N DPRB 10,413.98 WEXIT PJSM TO PU WS ASSY PU NEW WS ASSY 11:30 - 11:45 0.25 WHIP N DPRB 10,413.98 WEXIT PJSM TO MU WS SETTING BHA 11:45 12:45 1.00 WHIP N DPRB 10,413.98 WEXIT MU WS SETTING BHA CHECK BHI TOOLS @ SURFACE 12:45 - 16:00 3.25 WHIP N DPRB 10,413.98 WEXIT RIH WITH WS SETTING BHA LOG TIE IN WITH CORRECTION OF-38' RIH TO WS SETTING DEPTH 3.98 WEXIT SET WS AS PER BTT WS SETTING v J 16:00 16:20 0.33 STWHIP N DPRB 10,413.98 PROCEDURE ��7�' $ET TOWS Ccil 10.254'HS PSI BREAKOVER @ 4,000 PSI STACK 3K WOB WITH NO MOVEMENT OF WS 16:20 18:30 2.17 _ WHIP • N DPRB - 10,413.98 ' WEXIT POH WITH WS SETTING BHA 18:30 - 20:00 1.50 WHIP N ' DPRB i 10 413.98 WEXIT LD WS SETTING BHA. MU WINDOW MILLING BHA W/ORIENTER AND 0.6 DEG AKO MOTOR, 3.8"OD WINDOW MILL AND STRING REAMER. 20:00 - 23:00 3.00 STWHIP N ' DPRB 10,413.98 WEXIT RIH W/WINDOW MILLING BHA. TIE-IN, CORRECTION OF(-38'). 23:00 - 00:00 1.00 STWHIP N DPRB 10,413.98 WEXIT TAG WS(TOWS 10257.6'MD). PU CLEAN AT 38K LB. ESTABLISH FREESPIN OF 2.5 BPM AT 2500 PSI. TIME MILL INTO WINDOW. ENGAGE AT • 10260.2'MD. (NOTE:ALL MILLING PERFORMED AT 0 DEG(HIGHSIDE)TFO). 23:30-2.5 BPM AT 2520 PSI WI 1:1 RETURNS AND 500 LB DHWOB. BHP/PVT/ECD:4401 PSI /374 BBL/9.94 PPG. MILLING AHEAD AT 10260.6'MD. IAP: 115 PSI OAP:0 PSI OOAP: 0 PSI • • CONTINUED ON REPORT 11/07/10. Printed 2/22/2011 5:09:22PM North America -ALASKA- BP Page 4 of 24 Operation Summary Report Common Well Name: B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA ,UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/7/2010 00:00 - 06:00 7.00 STWHIP N DPRB 10,413.98 WEXIT CONTINUED FROM REPORT 11/06/10. !TIME MILL WINDOW W/HIGHSIDE TFO, MAINTAINING ROUGHLY 1500 LB-2500 LB DHWOB AND—150 PSI MOTOR WORK. 02:00-TIME MILLING AT 10262.8'MD AT 2.5 BPM AT 2670 PSI W/1:1 RETURNS. BHP/PVT/ECD:4397 PSI/374 BBL/9.93 PPG. DAYLIGHT SAVINGS. 02:00(SECOND TIME AROUND)-TIME MILLING AT 10264'MD AT 2.5 BPM AT 2625 PSI W/1:1 RETURNS AND 2K LB DHWOB. BPH/PVT/ECD:4414 PSI/374 BBL/9.96 PPG. 05:00-TIME MILLING AT 10265.7'MD AT 2.5 BPM AT 2610 PSI W/1:1 RETURNS AND 2.6K LB DHWOB. BHP/ECD/PVT:4410 PSI/9.96 PPG/373 BBL. IAP: 170 PSI. OAP:0 PSI. OOAP:0 PSI. 06:00 - 06:30 0.50 STWHIP N DPRB 10,413.98 WEXIT CREW CHANGE&HANDOVER 06:30 - 00:00 17.50 STWHIP N DPRB 10,413.98 WEXIT CONTINUE TO TIME MILL WINDOW FS 2,500 PSI @ 2.5 BPM 06:00-09:15 MILL FROM 10,266'TO 10,267.1' WITH 150- 180 PSI MTR WK, 3.3-3.6K WOB 12:30 MILL TO 10,267.9'WITH 150- 160 PSI MTR WK,3.3K WOB 14:50 INCREASE IN WTR WK TO 800 PSI& WOB INCREASED TO 4K NO STALLS MAY HAVE BREACHED CSG INTO FORMATION @ THIS POINT CONTINUE TIME MILLING WINDOW 16:00 MILLING @ 10,270.4'WITH 100 PSI MTR WK,1.1KWOB SHIFT CHANGE. 19:30-MILLING AT 10274.2'MD. NO LONGER TIME MILLING:MAINTAINING BETWEEN 2K LB AND 2.5K LB DHWOB AT 2.45 BPM AT 2550 PSI W/1:1 RETURNS. BHP/PVT/ECD:4397 PSI /364BBL/9.92PPG. SAMPLE DATA FROM 10272'MD-60%METAL, 120%CEMENT,20%FORMATION. SAMPLE DATA FROM 10274'MD-70%METAL, 20%CEMENT,10%FORMATION. 22:30-MILLING AT 10276.8'MD AT 2.47 BPM AT 2650 PSI W/1:1 RETURNS AND 3K LB DHWOB. STILL MAINTAINING HS TFO. BHP/PVT/ECD: 4407 PSI/362 BBL/9.92 PPG. IAP:310 PSI. OAP:0 PSI. OOAP:0 PSI. NOTE: TOW CALLED AT 10260.2'MD. BOW CALLED AT 10269.5'MD. ADDITIONALLY,A 0.6'MD DRILLING BREAK IS APPARENT IN BAKER'S DATA BETWEEN 7"AND 9-5/8". CONTINUED ON REPORT 11/08/10. Printed 2/22/2011 5:09:22PM North America -ALASKA- BP Page 5 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA WI:500292007200 --- - - - -— -- - ---- — - ---....-._.---- Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/8/2010 00:00 - 02:15 2.25 STWHIP N DPRB 10,413.98 WEXIT CONTINUED FROM REPORT 11/07/10. MILLING RATHOLE BELOW WINDOW. SAMPLE AT 10277'MD-80%METAL,15% CEMENT,5%FORMATION. SEE DRILLING BREAK AT 10278'MD. ABLE TO ACHIEVE-15 FPH ROP W/800-1300 LB DHWOB AND-150 PSI MOTOR WORK. PUMP 10 BBL LOW VIS SWEEP. MILL AHEAD AT-15 FPH TO 10280'MD. PERFORM THREE DRESSING RECIPROCATIONS ACROSS WINDOW: RECIPROCATION 1 -UP AT 100 FPH, DOWN AT 80 FPH. SAW-50 PSI CIRC PRESSURE INCREASE(TO 2550 PSI)FROM BOW AT 10269.5'MD TO TOW AT 10260.2'MD. PRESSURE FELL TO FREESPIN ABOVE AND BELOW WINDOW. RECIPROCATION 2-UP AT 100 FPH, DOWN AT 90 FPH. -25 PSI CIRC PRESSURE INCREASE ACROSS WINDOW. LOW VIS SWEEP AT SURFACE-NOTHING SUBSTANTIAL RETURNED. RECIPROCATION 3-UP AT 120 FPH, DOWN AT 90 FPH. CLEAN. DRY DRIFT-COMPLETELY CLEAN, NO BOBBLES. 02:15 - 04:45 2.50 STWHIP N DPRB 10,413.98 WEXIT PULL INTO CASED HOLE. OPEN EDC. CIRCULATE OOH,3 BPM AT 2520 PSI, ECD 10.03 PPG. 04:45 - 05:30 0.75 STWHIP N DPRB 10,413.98 WEXIT AT SURFACE. LD MILLING BHA. GAUGE MILL 'AND REAMER-BOTH ARE 3.79"NO-GO,3.80" GO. 05:30 - 06:00 0.50 DRILL N DPRB 10,413.98 PROD1 MU BUILD BHA W/2.3 DEG AKO MOTOR AND HYCALOG BI-CENTERED BIT. ?06:00 - 09:00 3.00 r DRILL N DPRB 10,413.98 PROD1 'TEST BHI TOOLS @ SURFACE RIH 1LOGTIE IN WITH-38'CORRECTION CONTINUE TO RIH&TAG TD @ 10,280' Printed 2/22/2011 5:09:22PM North America-ALASKA- BP Page 6 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) + (ft) 09:00 - 00:00 15.00 I DRILL P PROD1 DRILL BUILD FROM 10,280' FS2,500 PSI @ 2.4 BPM DRILL TO 10,302',0.5K-0.8K WOB,150-250PS1 MTR WK DROP PUMP RATES DUE TO HIGH VIBRATIONS ON MWD TOOLS FS 2,270 PSI @ 2.2 BPM DRILL TO 10,325',0.5K-2.0K WOB,150-200PSI MTR WK • BRING UP PR TO GET BETTER ROP FS 2,450 @ 2.3 BPM SLOW ROP DUE TO HIGH PERCENTAGE OF QUARTS&CHERT IN ZONE 3 SHIFT CHANGE. 18:45-DRILLING AHEAD AT 10344'MD AT 2.2 BPM AT 2435 PSI W/1:1 RETURNS AND 1200 { LB DHWOB. ROP-5 FPH. BHP/ECD/PVT: 4453 PSI/9.91 PPG/352 BBL. PUMP RATE HAS BEEN REDUCED TO CONTROL EXCESSIVE VIBRATION ON TOOL. IAP: 295 PSI, OAP: 0 PSI,OOAP:0 PSI. - I 20:15-DRILLING AHEAD AT 10353'MD AT 2.2 BPM AT 2440 PSI W/1:1 RETURNS AND 450 LB DHWOB. ROP-10 FPH. BHP/ECD/PVT: 4473 PSI/9.94 PPG/352 BBL. 23:10-DRILLING AHEAD AT 10376'MD AT 2.2 BPM AT 2520 PSI W/1:1 RETURNS AND 1400 LB DHWOB W/ROP-6 FPH. BHP/ECD/PVT: 4498 PSI/9.97 PPG/345 BBL. CONTINUED ON REPORT 11/09/2010 11/9/2010 00:00 - 06:00 6.00 DRILL P 1 PROD1 CONTINUED FROM REPORT 11/07/10 DRILLING AHEAD IN ZONE 3 02:00-DRILLING AHEAD AT 10392'MD AT 2.2 { I BPM AT 2500 PSI W/1:1 RETURNS AND 1750 LB DHWOB AND ROP-8 FPH. BHP/ECD/PVT: 4507 PSI/9.98 PPG/347 BBL. IAP:315 PSI. OAP:0 PSI,OOAP:0 PSI. 03:20-DRILLING AHEAD AT 10405'MD AT 2.2 BPM AT 2650 PSI W/1:1 RETURNS AND 1780 LB DHWOB AND ROP-15 FPH. DRILLING BREAK HERE-UP TO 15 FPH. GEOS BELIEVE THIS MARKS THE TRANSITION INTO ZONE 2. BHP/ECD/PVT:4521 PSI/10.00 PPG/346 BBL. 04:30-DRILLING AHEAD AT 10422'MD AT 2.2 BPM AT 2775 PSI W/1:1 RETURNS AND 3300 LB DHWOB AND ROP-20 FPH. / BHP/ECD/PVT:4532 PSI/10.01 PPG 346 BBL. 105:15-DRILLING AHEAD AT 10435'MD AT 2.52 BPM AT 2990 PSI(FREESPIN AT THIS RATE IS 2680 PSI)W/1:1 RETURNS AND-30 FPH ROP. FINALLY ABLE TO MAINTAIN A HIGHER PUMP RATE W/O INDUCING EXCESSIVE VIBRATION. DRILL TO 10450' 06:00 - 09:00 3.00 DRILL P PROD1 WIPER TRIP TO ABOVE WINDOW 1 LOG TIE IN WITH+1.5'CORRECTION CONDUCT MAD PASS. 09:00 - 15:00 6.00 DRILL P PROD1 DRILL BUILD SECTION THROUGH ZONE 3 AND INTO ZONE 2. Printed 2/22/2011 5:09:22PM North America -ALASKA- BP Page 7 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project: Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 19:30 4.50 DRILL P PROD1 CONTINUE DRILLING ZONE 2B. ROP IMPROVES SLIGHTLY TO 30 FT/HR. DRILLING AT 2.32/2.34 BPM @ 2600-2800 PSI. ROP IS 30 FT/HR WITH 1.76K DWOB. DRILL AHEAD TO 10650'MD. 19:30 - 21:15 1.75 DRILL P PROD1 SHIFT CHANGE. POOH FROM 10650'MD. OPEN EDC IN CASED HOLE AND CIRCULATE AT 3BPM. 21:15 - 21:30 0.25 DRILL P PROD1 PJSM PRIOR TO LD BHA. 21:30 - 23:00 1.50 DRILL P PROD1 FLOW CHECK-GOOD. UNSTAB AT 200'AND CHECK CT FOR EXCESSIVE CHROME ABRASION AS PUH-NONE NOTED. LD BUILD BHA. GRADE BIT 3/5. PRIMARY WEAR IS I BROKEN TEETH, PRIMARILY ON GAUGE ROW. SECONDARY WEAR IS RING OUT. FUNCTION TEST BOPE FROM DRILLERS PANEL AND FROM PANEL IN OPS CAB- GOOD. 23:00 - 23:15 0.25 DRILL P PROD1 PJSM PRIOR TO MU PILOT HOLE ASSEMBLY. 23:15 - 00:00 i 0.75 DRILL P PROD1 MU PILOT HOLE DRILLING ASSEMBLY W/1.2 DEG AKO MOTOR(DIFFERENT MOTOR FROM PREVIOUS RUN)W/HYC RAPTOR BIT W/ TORQUE CONTROL CUTTERS. NOTE: WWTANTI-STALL TOOL IS BEING FIELD TESTED ON THIS RUN-SERIAL NUMBER"ANTI-STALL TOOL 1" CONTINUED ON REPORT 11/10/2010. 11/10/2010 00:00 - 00:30 0.50 DRILL P PROD1 CONTINUED FROM REPORT 11/09/10. CONTINUE MU PILOT HOLE DRILLING BHA. 00:30 - 02:45 2.25 DRILL P PROD1 RIH W/PILOT HOLE BHA. 02:10-RIH AT 8690'MD PUMPING AT 0.45 BPM AT 1445 PSI THROUGH CLOSED EDC. 02:45 - 04:30 1.75 DRILL P PROD1 LOG TIE-IN,CORRECTION OF(-37.5'). MAD PASS FOR RESISTIVITY DATA AS RIH TO TAG. IAP: 170 PSI. OAP:0 PSI. OOAP:0 PSI. 04:30 - 08:00 3.50 DRILL P PROD1 FREESPIN 2.5 BPM AT 2760 PSI W/1:1 RETURNS. DRILL AHEAD FROM 10650'AT 2.5 BPM AT 3000 PSI W/2K LB DHWOB. BHP/ECD/PVT: 4628 PSI/10.09 PPG/312 BBL. NOTE: DELTA P ACROSS TOOLS IS 677 PSI. ROP—35 FPH. 05:10-DRILLING AHEAD AT 2.5 BPM AT 3115 PSI W/1:1 RETURNS AND 2.4K LB DHWOB. ROP—80 FPH. BHP/ECD/PVT:4627 PSI/10.08 PPG/311 BBL. DELTA P A T TOOL IS 823 PSI. 08:00 - 08:30 0.50 DRILL P PROD1 WIPER TRIP FROM 10800 FT TO WINDOW. 10 BBLS LO-VIS SWEEP WAS PUMPED,NO CHANGE IN DRILLING PARAMETERS OR RETURNED CUTTINGS. CLEAN PASS UP AND 'DOWN. 08:30 - 10:00 1.50 DRILL P PROD1 CONTINUE DRILLING WITH ANTI-STALL TOOL. DIFFICULT TO TELL IF ITS WORKING OR NOT. THE PRESSURE SETTING WHERE THE TOOL QUITS STROKING BACK(400 PSI)IS CLOSE TO FREE SPIN, SO IT MAY NOT BE ENGAGING AGAIN AFTER IT PULLS BACK. REDUCE PUMP RATE OFF BOTTOM TO GET PRESSURE DIFFERENTIAL BELOW 400 PSI TO ALLOW THE TOOL TO STROKE BACK OUT. DRILL TO 10950 FT. Printed 2/22/2011 5:09:22PM North America-ALASKA- BP Page 8 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site: PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 1 10:00 - 10:40 0.67 DRILL P I PROD1 'PUMP 10 BBLS LO-VIS SWEEP,PULL WIPER TRIP FROM 10950 FT. CLEAN PASS UP AND DOWN. NOTHING SEEN ON SWEEP. 10:40 - 11:40 1.00 DRILL P PROD1 DRILL FROM 10950 FT TO 10991 FT. 11:40 - 13:30 1.83 DRILL N HMAN PROD1 PICKUP AND CHECK WHAT MAGNETIC MODEL BHI IS USING TO PROCESS SURVEY DATA. • BHI IS USING THE BGGM 2010 MODEL WHICH HAS NOT BEEN APPROVED BY BP. RE-PROCESS SURVEYS USING THE 2009 VERSION AND RE-ENTER SURVEYS INTO BHI _ DBASE. 13:30 - 18:30 5.00 DRILL P PROD1 CONTINUE DRILLING WITH ANTI-STALL TOOL. DRILL AT 180L TF TO TRY AND REDUCE INC • TO 57 DEG. • 2.54/2.54 BPM @ 2900-3300 PSI. DELTA P IS • 400-900 PSI ACROSS BHA. • F FREE SPIN AT DRILLING RATE IS NOW AROUND 500 PSI,SO ITS NECESSARY TO DROP THE PUMP RATE OFF BOTTOM TO GET • THE TOOL TO STROKE BACK OUT. SLIGHT LOSS OF CIRC PRESSURE THEN STALL AT 11018 FT STALLS PAST 11018 FT, LIKELY 24N SHALE. PICK UP AND REDUCE PUMP RATE TO EXTEND AST. FREE SPIN AROUND 440 PSI AT 2.5 BPM. TAG BOTTOM AND PRESSURE 1 UP TO AROUND 900 PSI DELTA P,THEN PRESSURE FALLS OFF AS IF TOOL WAS !RETRACTING. ROP SLOWS TO AROUND 10 FT/HR PAST I ' 11020 FT,WITH STALLS. BRING PUMP RATE _ DOWN EACH TIME TO GET TOOL EXTENDED. 18:30 - 21:00 2.50 DRILL P PROD1 (CHANGE OUT. CONTINUE DRILLING AHEAD FROM 11029 FT AT 2.52 BPM AT 3105 PSI W/ 13.5-4K LB DHWOB.FREESPIN AT 2.52 BPM OF 12900 PSI. BHP/ECD/PVT:4654 PSI/10.12 PPG /313BBL. j DELTA P ACROSS TOOLS IS 750-950 PSI. 1 HAVE TO DROP THE PUMP RATE OFF 1 BOTTOM TO GET THE TOOL TO STROKE BACK OUT. DRILL TO 11033 FT.ROP CONTINUES TO • FALL OFF. 21:00 - 23:00 2.00 j DRILL P PROD1 CONTINUE DRILLING AHEAD FROM 11033 FT- VERY LITTLE PROGRESS BEING MADE. WITH 4.5-5k DHWOB AND 3200 PSI CIRC PRESSURE BIT APPEARS TO BE SPINNING ON BOTTOM WITH OUT MAKING ANY FOOTAGE. PUMP 15 BBL LO-VIS PILL AND SEE NO •CHANGE IN DRILLING PARAMETERS AND • NOTHING SEEN FROM BOTTOMS UP SAMPLE. P/U AND RBIH MULTIPLE TIMES AND STACK • (WEIGHT. SEE CIRC PRESSURE INCREASE AND LEVEL OFF EACH TIME WITH NO WEIGHT BEING DRILLED OFF. Printed 2/22/2011 5:09:22PM North America-ALASKA- BP Page 9 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI: 500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:00 - 23:30 0.50 DRILL P PROD1 PULL UP HOLE TO 10800 FT.AND PUMP AT 2.75 BPM IN ATTEMPT TO CLEAN BIT IF BALLED. RBIH TO BOTTOM AND ONCE AGAIN SEE WEIGHT STACK AND CIRC PRESSURE INCREASE AND THEN LEVEL OFF WITH NO WEIGHT BEING DRILLED OFF. 23:30 - 00:00 0.50 DRILL N DFAL PROD1 POOH TO CHECK BIT. 11/11/2010 00:00 - 01:30 1.50 DRILL N DFAL PROW CONTINUED FROM RON REPORT DATED 11/10/2010. CONTINUE POOH W/OPEN EDC IN CASED HOLE PUMPING AT 2.75 BPM. FLOW CHECK-GOOD. UNSTAB AT 100'AND CHECK CT FOR EXCESSIVE CHROME ABRASION AS PUH-NONE NOTED. 01:30 - 01:45 0.25 DRILL N DFAL PROD1 PJSM FOR L/D BHA. 01:45 - 02:30 0.75 DRILL N I DFAL PROD1 L/D PILOT HOLE BHA.UPON INSPECTION AT SURFACE FIND OUTER CONTROL ASSEMBLY FLANGE OF ANTI-STALL TOOL HAD COME APART DUE TO THE COPPER BERYLIUM NUTS HOLDING THE SHEAR BOLTS IN PLACE BACKING OFF OF THE TOOL LEAVING IT FREE TO ROTATE AROUND THE INNER CORE. DUE TO THIS IT IS THE APPARENT CAUSE FOR THE SLOW ROP AS IT ALLOWED THE ENTIRE ASSEMBLY FREE TO ROTATE BELOW THAT POINT. NOTE-*5 BERYLIUM COPPER NUTS-3/4" IN I LENGTH AND 5/8"IN DIAMETER WITH THE POSSIBILITY OF 5-1/2"LONG MP-35 STEEL BOLTS INTERNAL TO THE NUTS WERE LEFT i DOWNHOLE.* BIT GRADED 1/1. 02:30 - 02:45 0.25 DRILL N DFAL PROD1 PJSM FOR M/U PILOT BHA#2. 02:45 - 03:30 0.75 I DRILL N DFAL PROD1 MU PILOT HOLE DRILLINGASSEMBLY#2 W/ 1.2 DEG AKO MOTOR(DIFFERENT MOTOR FROM PREVIOUS RUN),SAME HYC RAPTOR BIT W/TORQUE CONTROL CUTTERS,AND NO ANTI-STALL TOOL. 03:30 - 05:15 1.75 DRILL ! N DFAL PROD1 RIH W/PILOT HOLE BHA#2. 05:15 - 05:30 0.25 DRILL N DFAL PROD1 LOG TIE-IN,CORRECTION OF(-40 FT). 05:30 - 06:00 0.50 DRILL N DFAL PROD1 CONTINUE RIH W/PILOT BHA#2. 06:00 - 07:30 1.50 DRILL N DFAL PROD1 PASS THROUGH WINDOW AND RIH TO BOTTOM. AT BOTTOM,WIPER TRIP BACK TO WINDOW. CLEAN PASS UP, NO EVIDENCE SEEN OF DEBRIS LEFT FROM PREVIOUS RUN. GOING BACK DOWN SEE A SLIGHT WT BOBBLE AT 11028 FT. 07:30 - 13:20 5.83 DRILL P PROD1 DRILL FROM 11030 FT. ROP SLOWLY IMPROVES AFTER 11050 FT. HOLD 71 DEG FOR NOW LOOKING FOR HOT AND BASE 23N SHALE. 2.51 /2.51 BPM @ 2800-3200 PSI. AFTER 11150 FT ROP SLOWS AGAIN,LIKELY ENTRY INTO 21 N SHALE. DRILL TO 11191 FT. Printed 2/22/2011 5:09:22PM North America -ALASKA- BP Page 10 of 24 Operation Summary Report Common Well Name: B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:20 - 13:40 0.33 DRILL P PROD1 CONTINUE DRILLING,ROP IS VARIABLE GOING THROUGH SHALE ZONES. HOLD 68 DEG FOR NOW TO TRY AND FIND HOT. 2.49/2.52 BPM @ 2860-3200 PSI. ROP IS 20-40 FT/HR WITH 2.3K DWOB,GOOD • WT TRANSFER. DRILL TO 11200 FT. 13:40 - 15:20 1.67 DRILL P PROD1 PUMP 10 BBLS LO-VIS THEN WIPER TRIP FROM 11200 FT TO WINDOW. PERFORM A TRIP SHEET FOR THE WIPER. SEE MOTOR WORK AND 5K OVERPULL AT 11010 FT,10830 FT. NOTHING SEEN GOING DOWN. 15:20 - 19:00 I 3.67 DRILL P ' PROD1 DRILL FROM 11200 FT. STILL DRILLING MOSTLY SHALE, MAY BE THE 22N WHICH IS NOT EXPECTED. ROP IS AROUND 20 FT/HR WITH 2-4K DWOB. 2.49/2.50 BPM @ 2850-3200 PSI. _ PVT=301 BBLS. 19:00 - 20:15 1.25 DRILL r P PROD1 DRILL FROM 11300 FT.SAMPLE CAUGHT AT 11275 FT(8954 FT SSTVD)SHOWS SIGNS OF HOT. ROP IS B/T 25-50 FT/HR WITH 3-4.5K DWOB. 2.56/2.57 BPM @ 3050 PSI. PVT=298 BBLS. CONTINUE DRILLING AHEAD TO PLANNED TD 1 OF 11357 FT AS GEO DISCUSSES PLAN I - FORWARD W/TOWN. •• 119:30-GEO'S DECIDE TO DRILL AHEAD TO 1 PLANNED TD. 20:15 - 20:30 0.25 DRILL P PROD1 TAT 11339 FT ROP INCREASED TO 80 FPH. 12.55/2.56 BPM @ 3100 PSI W/2K DHWOB. DRILL TO PILOT HOLE PLANNED TD OF 11357 ✓ FT. 20:30 - 22:30 2.00 DRILL P PROD1 BEGIN POOH PUMPING AT 2.55 BPM. SEE MW AT 11010 FT,10640 FT,AND 10500'. MW AT 10600 FT DUE TO TF ORIENTATION. NO OVERPULL SEEN AT 11,010 FT OR 10830 FT AS SEEN ON PREVIOUS WIPER. PULL 100 FT ABOVE WINDOW AND OPEN EDC PUMPING AT 3.6 BPM. RBIH TO TOP OF WINDOW AND PUMP 17 BBL LO-VIS PILL AND TIME TO COINCIDE COMING OUT OF BIT AT TOP OF WINDOW AND PULL UP HOLE INTO TUBING TAIL TO JET CUTTINGS OOH. • NOTE:GOOD AMOUNT OF CUTTINGS COMING ACROSS THE SHAKER WITH THE LO-VIS PILL. STATOR RUBBER FROM THE MOTOR ALSO SEEN. MOTOR RUBBERR COULD ACCOUNT FOR SOME OF THE MW SEEN AS IT WAS PASSING THRU THE BIT. Printed 2/22/2011 5:09:22PM North America-ALASKA- BP Page 11 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay I - B—y Site: PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date j From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (ft) 122:30 - 23:15 0.75 DRILL P PROD1 RIH FROM TUBING TAIL TO WINDOW AND CLOSE EDC. RIH THRU WINDOW WITH PUMPS OFF AND PUMP AT MIN RATE OF 0.55 BPM PAST WINDOW DOWN TO 11200 FT TO ENSURE HOLE IS CLEAN DOWN PAST BILLET SETTING DEPTH. NOTHING SEEN ON TRIP BACK DOWN TO 11200'. HOLE APPEARS TO BE IN GOOD CONDITION. 23:15 - 00:00 0.75 DRILL P PROD1 POOH W/PILOT HOLE BHA#2. NO MOTOR WORK OR OVERPULLS SEEN ON TRIP OOH UP TO WINDOW. OPEN EDC ABOVE WINDOW AND PUMP AT 3 BPM. 11/12/2010 00:00 - 01:00 1.00 DRILL P PROD1 CONTINUED FROM RON REPORT DATED 11/11/2010. CONTINUE POOH W/OPEN EDC IN CASED HOLE PUMPING AT 3.0 BPM. PJSM IN DOGHOUSE PRIOR TO P/U BOT AL BILLET AND SETTING TOOL THRU THE BEAVER SLIDE. CLOSE EDC AND PERFORM FLOW CHECK- GOOD. UNSTAB AT 200'AND CHECK CT FOR 'EXCESSIVE CHROME ABRASION AS PUH- NONE NOTED. ' 01:00 - 01:15 0.25 DRILL P PROD1 PJSM FOR L/D PILOT HOLE BHA#2. 01:15 - 02:15 1.00 DRILL P PROD1 1 PREP FLOOR FOR LAYING DOWN BHA. L/D � I PILOT HOLE BHA#2. BIT GRADED 1-2. 02:15 - 02:30 0.25 DRILL P PROD1 AAR FOR L/D BHA AND PJSM FOR M/U BILLET SETTING BHA. 02:30 - 03:30 1.00 DRILL P PROD1 M/U BILLET SETTING BHA CONSISTING OF"J" HYDRAULIC SETTING TOOL,ALUMINUM BILLET,AND OH ANCHOR. 03:30 05:15 1.75 DRILL P PROD1 RIH W/BILLET SETTING BHA AT 90 FPM IN 't 0 CASED HOLE. 05:15 - 05:40 0.42 DRILL P + PROD1 LOG TIE-IN AT WINDOW.(-40)FT CORRECTION. (,1 v- 05:40 - 07:00 1.33 DRILL r P PROD1 CONTINUE RIH W/BILLET. RIH rf (HICK LEAVES..B.ILLELTOP L AT 1092 FT.CLEAN PASS TO BOTTOM, I NOTHING SEEN. �- PARK AT 10931 FT AND ZERO DWOB SENSOR, CONFIRM ANCHOR ORIENTATION I IS FOR A HIGH-SIDE SET. !PRESSURE UP SLOWLY(EDC WAS ALREADY CLOSED). 1AT4000 PSI SHEAR OFF SETTING TOOL. DWOB CLIMBS TO4.26K DURING THE SETTING PROCESS THEN FALLS AWAY TO 10.65K. 'AFTER SHEARING OFF CREEP IN HOLE SLOWLY TO SET SOME WT ON THE BILLET I TO CONFIRM A GOOD SET. SET 1.6K DWOB ON THE BILLET, HOLDING STEADY. Printed 2/22/2011 5:09:22PM North America -ALASKA- BP Page 12 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) _ (ft) 07:00 - 09:45 2.75 DRILL P PROD1 PJSM THEN PICK UP TO ABOVE WINDOW. PARK AT 10250 FT AND OPEN EDC,SWAP TO NEW MUD SYSTEM. 09:45 - 12:00 2.25 DRILL P PROD1 NEW MUD ALL THE WAY AROUND. PJSM THEN POOH. 12:00 - 12:15 0.25 DRILL P PROD1 PJSM FOR UD BHA. DISCUSS CREW RESPONSIBILITIES,WELL CONTROL AWARENESS. 12:15 - 12:45 0.50 DRILL P PROD1 TAG STRIPPER AND FLOW CHECK WELL, NO FLOW. TRIP SHEET HAS 0 GAIN/LOSS. OPEN RISER AND STAND BACK INJECTOR. L/D AND OFFLOAD BILLET SETTING TOOLS, TOOL HAS FUNCTIONED NORMALLY. 12:45 - 15:00 2.25 DRILL P PROD1 CLOSE SWAB AND MASTER. PJSM THEN REMOVE BHI CABLE HEAD, INSTALL BOOT ON END OF CABLE. M/U CT RISER TO WELL, PUMP SLACK BACKWARDS. CUT OFF 100 FT OF CT,THEN INSTALL CT CONNECTOR. PULL TEST TO 40K. PUMP SLACK FORWARDS. 15:00 - 19:00 4.00 DRILL -r P PROD1 INSTALL BHI CABLE HEAD. CTC CONNECTION LEAKED. REMOVE BHI CABLE I4 HEAD AND CTC. CUT ADDITIONAL 29'OF - COIL LOOKING FOR GOOD SPOT. RE-INSTALL CT CONNECTOR. 19:00 - 21:15 2.25 DRILL- P PROD1 PT CTC TO 3000 PSI W/HAND PUMP. PULL TEST TO 36K. INSTALL BHI CABLE HEAD AND TEST. PT BHI TOOLS TO 4000 PSI-GOOD. PT UQC CHECK VALVES AND CHART- . PASSED. BEGIN ADDING KLA-GARD TO MUD TO BRING UP CONCENTRATION FROM 10 PPB TO 14 PPB. 21:15 - 21:30 0.25 DRILL P PROD1 PJSM FOR M/U OHST BHA. DISCUSS PROPER EQUIPMENT FOR THE JOB,WELL CONTROL AWARENESS,AND DROPPED OBJECT AWARENESS. 21:30 22:30 1.00 DRILL P PROD1 OPEN MASTER AND SWAB.REMOVE NIGHT CAP AND FILL HOLE W/—3 BBLS. M/U OHST BHA. 22:30 - 00:00 1.50 DRILL P PROD1 RIH W/OHST BHA CONSISTING OF 1.3 DEG AKO AND HCC BI-CENTER BIT. CIRC THRU OPEN EDC AT 1.9 BPM/1500 PSI. 11/13/2010 - STKOH P PROD1 DRY TAG TOP OF BILLET AT 10919.3 FT. P/U 10 FT AND BRING PUMPS UP TO 2.56 BPM. EASE DOWN AND TAG BILLET AT 10920.6 FT. 2.57/2.59 BPM.FREE SPIN 2360 PSI BEGIN TIME MILLING AT 1 FPH. 00:00 - 00:15 0.25 STKOH P PROD1 CONTINUED FROM RON REPORT DATED 11/12/2010. CONTINUE RIH W/OHST BHA. 00:15 - 00:45 0.50 STKOH P PROD1 LOG TIE-IN IN CASED HOLE. (-36)FT CORRECTION. CLOSE EDC.RECORD SLOW PUMP RATES AND CONTINUE RIH TO WINDOW. LOG TIE-IN ACROSS RA TAG TO CONFIRM CORRECTION. NO CHANGE. Printed 2/22/2011 5:09:22PM North America -ALASKA- BP Page 13 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site: PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA 'UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT NPT Depth! Phase Description of Operations (hr) (ft) 00:45 - 01:15 0.50 STKOH P i PROD1 CONTINUE RIH W/OHST BHA. I DRY TAG TOP OF BILLET AT 10919.3 FT. P/U 1 10'AND EASE BACK DOWN. TAG BILLET AT 10920.6'W/PUMPS AT 2.58 BPM. 01:15 - 04:00 2.75 � STKOH P PROD1 'BEGIN TIME MILLING OFF BILLET W/ HIGHSIDE TFO AT 1 FPH. FS AT 2.58 BPM IS 2360 PSI. BHP/PVT/ECD:4505 PSI/384 BBL/9.81 PPG. ' 3 STALLS GETTING STARTED ON BILLET. P/U AND EASE BACK DOWN EACH TIME. 02:30-TIME MILLING AT 1 FPH AT 10920.7'MD AND 2.59 BPM AT 2370 PSI W/1:1 RETURNS. BHP/PVT/ECD:4466 PSI/383 BBL/9.73 PPG. . 03:00-STALL THREE TIMES AT 10290.75'. CONTINUE TIME MILLING FROM 10920.8'AT 1 FPH AT 2476 PSI AND 2.68 BPM. I 04:00-TIME MILLING BILLET AT 10921.6'AT 2.67 BPM AND 2465 PSI. 04:00 - 05:00 1.00 STKOH P i PROD1 ATTEMPT TO INCREASE RATE AFTER MILLING FIRST FOOT TO 2 FPH RESULTING IN A STALL. 1 DECREASE RATE BACK TO 1 FPH AND iCONTINUE MILLING BILLET. I l TIME MILL TO 10922.2'. STALL AT 10922.2' !AND P/U. j ! ISTALL 2 TIMES AT 10920.6'EASING BACK I DOWN. j 1P/U AND EASE BACK IN SLOWLY AND MAKE i 05:00 - 05:40 0.67 STKOH N STUC r rIT BACK TO 10921.5'AND STALL AGAIN. PROD1 ATTEMPT TO P/U FROM STALL AT 10921.5' AND APPEAR TO BE STUCK. PULL 50K OVER W/NO LUCK. ABLE TO ORIENT 90 DEG LEFT AND 100 DEG RIGHT. STILL ABLE TO CIRCULATE. APPEAR TO BE BIT STUCK. 05:40 - 07:30 1.83 I STKOH P PROD1 PULL FREE HOLDING—22-23k OVER AND HOLDING 90 DEG LEFT TF. PUH TO WINDOW TO TIE-IN PRIOR TO RBIH. 07:30 - 09:00 ! 1.50 STKOH P ! 1 PROD1 RIH, DRY TAG AT 10922.6 FT. 1 ;START PUMP AND TAG, STALL AT 10920.7 FT. ! START TIME MILLING FROM 10920.5 FT. MILL i 1 FT/HR,OL TF. 2.53/2.55 BPM. 1 I STALL AT 10921.0 FT,WITH A 10K OVERPULL ! j WHEN PICKING UP. WHILE RUNNING BACK IN,STALL AT 10918.9 FT,NO STALL AT THIS DEPTH BEFORE. Printed 2/22/2011 5:09:22PM North America-ALASKA- BP Page 14 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site: PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM j Rig Release: Rig Contractor:NORDIC CALISTA jUWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:00 - 10:00 1.00 STKOH N STUC I PROD1 WORK DOWN TO 10920.7 FT AND ATTEMPT PTO P/U FOLLOWING STALL. STUCK AT THIS - 'DEPTH. PULL 20K OVER ON DWOB 6 TIMES AT OL TF, NO LUCK. GO TO NEUTRAL WT AND TURN ORIENTER, TURNS FREELY WITH NO EXCESS CURRENT, END STOPS ARE NOT MOVING. PULL 25K OVER AT 90R AND 90L, NO LUCK. PULL 2 MORE TIMES 5K TO-25K DWOB AT OL TF, NO LUCK. COILLIFE AT 60%FOR THE SECTION THAT IS GETTING WORKED OVER THE GOOSENECK. STOP AND DISCUSS PLAN FORWARD WITH ODE,WTL. WILL SPOT 25 BBL MINERAL OIL I PILL AND TRY WORKING PIPE AGAIN. CIRC 1.0 BPM WHILE WAITING. 09:15 - STKOH N STUC PROD1 AAR FOR PUMPING SLACK FOLLOWED BY PJSM FOR CUTTING COIL. RIG UP CT CUTTER AND CUT 533'OF COIL. 10:15-BKR FISHING HANDS ARRIVE ON LOCATION. 10:00 12:30 2.50 STKOH N STUC T MI - 1 PROD1 WAIT ON LVT(MINERAL OIL)TO ARRIVE AT RIG. 12:30 - 14:40 2.17 STKOH N STUC PROD1 OIL ARRIVES. PJSM FOR PUMPING IT. SPECIFY MIN BHP. 1 PUMP 10 BBLS HI-VIS AHEAD,25 BBLS LVT, 10 BBLS HI-VIS BEHIND, SO LVT CAN BE RECOVERED. 14:40 - 15:20 0.67 STKOH N STUC PROD1 AFTER 15 BBLS LVT OUT SHUT DOWN AND 'ALLOW IT TO SOAK 10 MIN. f- TURN TO 90L, ORIENTER STILL TURNING FREELY. MONITOR ECD WHILE PUMP IS OFF, ECD FALLS TO 8.59 PPG. I CYCLE PIPE-5K TO 85K 3 TIMES. ;PUMP REMAINING 10 BBLS OIL OUT. ORIENT TOOL TF,CYCLE PIPE-5K TO 85K 2 MORE TIMES. 15:20 - 16:00 0.67 STKOH N STUC PROD1 GO BACK TO 50K WT,CYCLE PUMP TO 3000 I PSI INTERNAL CT PRESSURE AND DUMP IT WITH BAKER CHOKE. TRY IT 3 MORE TIMES AT 40K, NO LUCK. 116:00 - 17:35 1.58 STKOH N STUC PROD1 DISCUSS FORWARD PLAN WITH ODE,WTL AND SUPT. DECISION IS MADE TO DISCONNECT USING THE EDC. PIPE HAS I � I BEEN CYCLED 30 TIMES AT THIS SPOT,ALL OTHER VIABLE OPTIONS EXHAUSTED. CIRC LVT OUT OF WELL. MONITOR ECD TO MAINTAIN>8.5 PPG. '1.09/1.1 BPM @ 2070 PSI. ECD=8.93 PPG. Printed 2/22/2011 5:09:22PM North America-ALASKA- BP Page 15 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (ft) 17:35 - 18:00 0.42 STKOH N STUC PROD1 ALL LVT OUT OF THE WELL SHUT DOWN PUMP AND GO TO NEUTRAL WT. SEND DISCONNECT SIGNAL TO TOOL, SHOWS DISCONNECT AFTER 5 MINUTES. TRY TO PICK UP, PICK UP TO 50K, STILL ON TOOL. PUMP RATE AND PRESSURE INDICATES WE ARE STILL PUMPING THROUGH THE BIT. STACK DOWN MORE WT,ABOUT 10K TO RELEASE THE COLLETS HOLDING THE TOOL TOGETHER. POOH.START TRIP SHEET. NOTE-*TOP OF FISH AT 10857.5 MD.* 18:00 - 20:00 2.00 FISH N STUC PROD1 CONTINUE POOH. ONCE ABOVE WINDOW AND IN CASED HOLE CIRC AT 2.2 BPM AT 1800 PSI. ECD=8.86 PPG. 20:00 - 20:15 0.25 FISH N STUC PROD1 tPJSM FOR LAYING DOWN BHA.DISCUSS WELL CONTROL ISSUES, DROPPED OBJECTS,AND PINCH POINTS. 20:15 - 20:45 0.50 FISH I N STUC PROD1 STOP AT 100'AND PERFORM FLOW CHECK- NO FLOW. TAG STRIPPER. TRIP SHEET HAS 0 GAIN/LOSS. OPEN RISER AND STAND BACK INJECTOR. - UD BHA. 20:45 - 21:15 0.50 • FISH N STUC PROD1 PJSM FOR PUMPING SLACK FORWARD. SLB INDICATES 2.57%SLACK WHICH EQUATES 10 390'. PUMP 260'OF SLACK OUT LEAVING 130 OF POSSIBLE SLACK IN COIL 21:15 - 23:15 2.00 FISH N STUC PROD1 AAR FOR PUMPING SLACK FOLLOWED BY PJSM FOR CUTTING COIL. RU CT CUTTER AND CUT 533'OF COIL. • • BKR FISHING HANDS ARRIVE ON LOCATION AT 22:15. 2315 - 00:00 0.75 FISH N STUC PROD1 INSTALL BOT SLIP TYPE CTC AND PULL TEST TO 40K. PT TO 4000 PSI. BRING BKR FISHING TOOLS UP BEAVER SLIDE. 11/14/2010 00:00 - 01:00 1.00 FISH N STUC f PROD1 CONTINUED FROM RON REPORT DATED 11/13/2010. PUMP 5/8"DRIFT BALL THRU COIL BALL HEARD PASSING THRU COIL AND HIT AT-49 BBLS. COIL VOLUME IS-55 BBLS. 01:00 - 01:15 0.25 FISH N STUC PROD1 PJSM FOR M/U FISHING BHA. 01:15 - 02:15 1.00 FISH N STUC PROD1 BHA CONSISTS OF 3"GS SPEAR, HYD. DISCONNECT,BOWEN UP/DOWN JAR,3 WEIGHT BARS,ACCELERATOR,DBPV,&5 JTS OF 2-3/8"P116. 02:15 - 04:30 2.25 FISH N STUC PROD1 START TRIP SHEET. BEGIN RIH W/FISHING BHA AT 0.75 BPM AND 1300 PSI. RECORD UP WT.OF 38K. Printed 2/22/2011 5:09:22PM North America -ALASKA- BP Page 16 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.:NORDIC 2 Spud Date/Time:10/5/2010 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA i UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 05:20 0.83 FISH N STUC PROD1 TAG TOP OF FISH AT 10897.4'MD UNCORRECTED. PULL 10K OVER TO CONFIRM LATCHED IN. STACK 10K DOWN AND HIT FIRST JAR LICK DOWN. HIT TEN JAR LICKS DOWN W/NO LUCK. AFTER TEN JAR LICKS AT 10K DOWN START JARRING UP. FIRST JAR LICK UP AT 10K OVER AND THEN IN INCREASING INTENSITY. LIMIT TO 20K OVER IN ORDER TO NOT EXCEED TENSILE LIMIT OF HOT. HIT TOTAL OF 15 JAR LICKS UP. 05:20 - 05:30 0.17 FISH N STUC PROD1 AFTER 25 CYCLES CALL TOWN TO DISCUSS INCREASING INTENSITY OF LICKS ABOVE WEAK POINT LIMIT-OK GIVEN TO PROCEED. JAR LICK UP AT 30K OVER AND COME FREE. UP WT W/FISH POOH 43K. BEGIN POOH PUMPING DOWN BACKSIDE. 05:30 - 08:20 2.83 FISH N STUC PROD1 POOH. HOLD 100-200 PSI WHP WHILE PUMPING DOWN KILL LINE TO KEEP WELL FULL. 08:20 - 08:30 0.17 FISH N STUC PROD1 AT 700 FT EASE CHOKE OPEN AND CIRC ACROSS TOP OF WELL WHILE POOH. TRIP SHOWS-3 BBLS TO THIS POINT. 08:30 - 09:00 0.50 ,FISH N.' STUC PROD1 TAG STRIPPER AND SHUT DOWN PUMP. FLOW CHECK WELL PJSM FOR LID FISHING BHA. DISCUSS BEST WAY TO HANDLE THE RECOVERED BHA AND WELL CONTROL IMPLICATIONS. 09:00 - 10:30 1.50 DRILL P PROD1 OPEN RISER AND STAND BACK INJECTOR. UD FISHING BHA, RECOVER 100%OF BHA. BIT IS 2-4,WITH BROKEN CUTTERS AND SOME DEEP SCRAPES ON THE NOSE. 10:30 - 12:30 2.00 DRILL P' PROD1 M/U CT RISER TO WELLHEAD,PUMP SLACK BACKWARDS. OPEN CT RISER,CUT OFF CT CONNECTOR AND RIG UP HYDRAULIC CUTTER. CUT OFF 220 FT OF CT. 12:30 - 14:00 1.50 DRILL P PROD1 INSTALL CT CONNECTOR. PULL TEST TO 40K. 14:00 - 15:30 1.50 DRILL P PROD1 INSTALL BHI CABLE HEAD AND PT CABLE HEAD AND CHECK VALVES SEPARATELY. 15:30 - 15:45 0.25 DRILL P PROD1 PJSM FOR P/U BHA. 15:45 - 16:45 1.00 DRILL P PROD1 PICK UP BHA#11-OH BILLET WITH 3(' COILTRAK. 16:45 - 18:15 1.50 DRILL P PROD1 RIH WITH BHA#11 W/OPEN EDC. 18:15 - 18:45 0.50 DRILL P PROD1 LOG TIE-IN AND MAKE(-37')CORRECTION. Printed 2/22/2011 5:09:22PM North America-ALASKA- BP Page 17 of 24 Operation Summary Report Common Well Name: B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project: Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7: 04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:45 - 19:30 0.75 DRILL P PROD1 CONTINUE RIH W/BILLET. CLOSE EDC BEFORE RUNNING THRU WINDOW. RIH AT MIN. RATE W/CLOSED EDC TO 10876 � V FT,WHICH LEAVES BILLET TOP AT 10865 FT 6ikkils CLEAN PASS THRU WINDOW AND TO BOTTOM. PARK AT 10876 FT AND ZERO DWOB SENSOR, CONFIRM ANCHOR ORIENTATION IS FOR A HIGH-SIDE SET. PRESSURE UP SLOWLY. AT 4300 PSI SHEAR OFF SETTING TOOL. DWOB CLIMBS TO 2.35K DURING THE SETTING PROCESS THEN FALLS AWAY TO 0 65K. AFTER SHEARING OFF CREEP IN HOLE SLOWLY TO SET SOME WT ON THE BILLET TO CONFIRM A GOOD SET, SET 4K DWOB ON THE BILLET,HOLDING STEADY. 19:30 - 21:30 2.00 DRILL P ' PROD1 PJSM THEN BEGIN POOH W/BILLET SETTING BHA. 21:30 - 21:45 0.25 DRILL P PROD1 PJSM FOR UD BHA. 21:45 23:00 1.25 DRILL P PROD1 TAG STRIPPER AND FLOW CHECK WELL,NO .FLOW. • • OPEN RISER AND STAND BACK INJECTOR. UD BHA.SETTING TOOL HAS FUNCTIONED NORMALLY. NOTE-RECOVERED WHAT APPEARS TO BE A PIECE OF BERYLIUM COPPER FROM INSIDE THE SETTING TOOL. LOOKS TO BE 'THE HEAD OF ONE OF THE NUTS LOST DOWN HOLE FROM THE ANTI-STALL TOOL. 23:00 - 00:00 1.00 DRILL P PROD1 OFFLOAD BILLET SETTING TOOLS. PREP FOR TESTING BOPE.GREASE TREE AND BLOW DOWN STACK. 11/15/2010 00:00 - 04:30 4.50 BOPSUR P PROD1 'TEST BOPE. AOGCC RIGHT TO WITNESS TEST WAS WAIVED BY INSPECTOR CHUCK SHEVE. rl TEST CT STRIPPER,ANNULAR, UPPER AND (-1(1‘.,1° -1(`i LOWER 2-3/8"PIPE/SLIP RAMS, BLIND/SHEAR RAMS,VBR RAMS,2 HCR VALVES,CHOKE AND KILL LINE VALVES ON BOP STACK, -le> CHOKE MANIFOLD VALVES,AND FLOOR SAFETY VALVE. 04:30 - 04:45 0.25 BOPSUR P PROD1 PJSM FOR PT INNER REEL VALVE. 04:45 - 07:00 2.25 BOPSUR P PROD1 PT INNER REEL VALVE AND CHECK VALVES IN UPPER QUICK CONNECT. 07:00 - 07:15 0.25 DRILL P PROD1 PJSM FOR PICKING UP BHA#12. WELL CONTROL SCENARIOS,DROPPED OBJECTS AND 50#RULE WERE DISCUSSED. 07:15 - 08:30 1.25 DRILL I P ' PROD1 M/U BHA#12-HCC BICENTER,1.3 DEG MOTOR,3"COILTRAK WITH RES. BHA OAL=78.77 FT. 08:30 - 11:40 3.17 DRILL P PROD1 RIH BHA#12. PUMP 0.53/1100 PSI THROUGH THE BIT. TIE IN DEPTH,CORRECT-38.5 FT. PASS THROUGH WINDOW,RIH. Printed 2/22/2011 5:09:22PM North America-ALASKA- BP Page 18 of 24 Operation Summary Report Common Well Name:8-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:40 - 15:40 4.00 DRILL P I PROD1 ,DRY TAG BILLET AT 10865.5 FT. UP WT IS 42K, CLEAN P/U. BRING PUMP UP AND GET FIRST STALL AT 10864.6 FT,CALL THIS TOP BILLET. START TIME MILLING 10864.0 FT AT 1 FT/HR. DIFFICULT SLIDING,STACKING WT AND GETTING STALLS WITH CLEAN P/U. 15:40 16:40 1.00 DRILL P PROD1 STALL AT 10865.7 FT. P/U IS CLEAN,TRY TO MAINTAIN CONSTANT DWOB AROUND 0.4K AFTER THIS. ABLE TO GET KICKED OFF AFTER ABOUT 1 MORE HOUR. DRILL TO 10880. 16:40 - 19:00 2.33 DRILL P PROD1 DRILL LATERAL SECTION FROM 10880 FT. START ROLLING TF TO THE LEFT TO ACHIEVE SEPARATION FROM THE OLD WELLBORE. ROP IS 20-30 FT/HR WITH 0.5-1 K DWOB, MOTOR IS WORKING 200-400 PSI, MORE THAN EXPECTED FROM THE LITHOLOGY. CHANGE OUT AND CONTINUE DRILLING AHEAD W/INCREASING ROP TO 10950 FT. 19:00 - 20:45 r 1.75 DRILL P PROD1 DRILLING AHEAD IN LATERAL SECTION FROM 10950 FT W/1:1 RETURNS HOLDING 90L TF TO GET DEPARTURE. ROP HAS INCREASED TO 80-120 FPH W/ 0.5-1.0K DHWOB. • BHP/ECD/PVT:4554 PSI/9.89 PPG/371 BBLS. AT 11,007 FT MD ROP DROPS TO 20 FPH W/ • 1.5K DHWOB CROSSING 24N SHALE AT 81 DEG INC. DRILL TO 11,030 FT. 20:45 - 21:45 1.00 DRILL P : PROD1 WIPER TO WINDOW. TRIP PAST BILLET W/ PUMPS AT 0.5 BPM AND OL TF.CLEAN PASS __ UP AND BACK DOWN. 121:45 - 22:45 1.00 DRILL P r PROD1 DRILL AHEAD FROM 11030 FT. FS AT 2.54 BPM IS 2570 PSI W/ 1:1 RETURNS. 2700 PSI CIRC W/2K DHWOB. BHP/ECD/PVT:4568 PSI/9.93 PPG/368 BBLS. 121:45-DHWOB SENSOR APPEARS TO HAVE STOPPED WORKING. 22:15-P/U OFF BOTTOM, CYCLE PUMPS, RESET WOB, RBIH TO RESUME DRILLING AND STILL NOT WORKING CORRECTLY. DRILL TO 11,054 FT. 22:45 - 00:00 1.25 DRILL P PROD1 CONTINUE DRILLING AHEAD FROM 11054 FT. ROP INCREASES TO 60 AND DHWOB STARTS WORKING AGAIN. 2820 PSI CIRC AT 2.53 BPM W/1.0-1.5K DHWOB AND 1:1 RETURNS. BHP/ECD/PVT:4572 PSI/9.93 PPG/368 BBLS. DRILLED TO 11,109 FT. REPORT CONTINUED ON RON REPORT 'DATED 11/16/2010. Printed 2/22/2011 5:09:22PM North America -ALASKA- BP Page 19 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site: PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/16/2010 00:00 01:45 1.75 DRILL P PROD1 CONTINUED FROM RON REPORT DATED 11/15/2010 DRILL AHEAD FROM 11,109 FT.ROP IS 40-80 FPH. 2970 PSI CIRC AT 2.55 BPM IN/OUT. 1.0-1.5K DHWOB. BHP/ECD/PVT:4587 PSI/9.95 PPG/369 BBL ROP DROPS TO 10-15 FPH CROSSING THE 22N. DRILL TO 11,181 AND START WIPER. SAMPLES ARE SHOWING—5-15%CHERT. 01:45 - 03:00 1.25 DRILL P PROD1 WIPER TO WINDOW. TRIP PAST BILLET AT 0.5 BPM AND OL TF.CLEAN PASS UP AND DOWN. 03:00 - 05:00 2.00 DRILL P PROD1 FS AT 2.54 BPM IS 2600 PSI. DRILL AHEAD FROM 11,181'MD. ROP IS 20 FPH. 2800 PSI CIRC AT 2.54 BPM IN/OUT. BHP/ECD/PVT:4604 PSI/9.97 PPG/368 BBLS. DHWOB SENSOR IS NOT WORKING CORRECTLY. APPEARS TO WORK OFF BOTTOM AND ONCE ON BOTTOM INCREASES I I AND STAYS THE SAME. 103:45-STALL ONCE AT 11,193'MD. ROP FALLS TO 5 FPH THEN BACK UP TO 20 FPH. 2970 PSI CIRC AT 2.65 BPM IN/OUT. DRILL TO 11,205'MD. 05:00 - 07:30 2.50 DRILL P PROD1 FS AT 2.65 BPM IS 2730 PSI. DRILL AHEAD FROM 11,205'MD.ROP IS 50-60 FPH. 3120 PSI CIRC AT 2.65 BPM IN/OUT. BHP/ECD/PVT:4635 PSI/10.02 PPG/366 BBLS. 06:15-DRILLING AHEAD AT 11,2650'MD. ROP X60-90 FPH 3300 PSI CIRC AT 2.65 BPM. _ t i !DRILL TO 11330 FT. 07:30 - 09:00 1.50 DRILL P PROD1 ;WIPER TRIP FRM 11330 FT. PULL PAST BILLET AT 0.5 BPM,OL TF. PULL THROUGH WINDOW AT 0.3 BPM,OL TF. GO BACK TO FULL RATE AND RECIP PIPE, THEN OPEN EDC. • CLEAN 7"AT 2.9 BPM,THEN TIE-IN DEPTH. • CORRECT+4 FT. CONTINUE WIPER TO BOTTOM. CLEAN PASS UP AND DOWN. Printed 2/22/2011 5:09:22PM North America -ALASKA- BP Page 20 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay I Site: PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth! Phase Description of Operations --- (hr) (ft) — --- - 09:00 - 16:30 7.50 DRILL P PROD1 ILL FROM 11330 FT. REDUCE INC TO 85 '., DEG TO ACHIVE LANDING AT 8945 FT ND. ROP IS SLOW,CUTTING SHALE PAST 11350 FT. 2.52/2.54 BPM @ 2900-3300 PSI. PVT=348 BBLS, ECD= 10.04 PPG. SAMPLE AT 11385 FT HAS RELATIVELY LITTLE CHERT, MOSTLY CLEAN SAND. DRILLING IS VERY INCONSISTENT,WITH • PERIODS OF HIGH MOTOR WORK AND SLOW ROP. DRILL TO 11397 FT. ROP HAS NOT IMPROVED EVEN AFTER ENTERING CLEAN SAND. POOH TO CHECK/CHANGE BIT. 16:30 - 19:00 2.50 DRILL P PROD1 PJSM WITH NORDIC AND SLB DRILLER,THEN POOH. PULL PAST BILLET AT OL TF,0.5 BPM. PULL THROUGH WINDOW AND RECIP PIPE, THEN OPEN EDC. 19:00 - 19:45 0.75 DRILL P PROD1 CREW CHANGE AND CONTINUE POOH FROM 2600' 19:20 PJSM TO LD DRILLING BHA, DISCUSSED SAFETY,ROLES& RESPONSIBILITIES AND WELL CONTROL WITH A NON-SHEARABLE ACROSS THE STACK 19:45 - 20:00 0.25 DRILL P . PROD1 TAG STRIPPER,SHUT DOWN PUMP AND CHECK WELL FOR FLOW TRIP SHEET HAS-1 BBL LOSS NO-FLOW CHECK IS GOOD,CHECK LUBRICATOR FOR PRESSURE AND STAND 1 'BACK INJECTOR 20:00 - 20:20 0.33 DRILL P ' PROD1 AAFTER BLOWING DOWN THE BHA WITH THE BAG CLOSED,WE WERE NOT ABLE TO GET 0 PSI ON THE ELECTRONIC OR MECHANICAL GAUGES.THE CHOKE MANIFOLD WAS LINED UP CORRECT AND THERE WAS NO FLOW AT THE SHACKER BUT THE ELEC GAUGE WAS STILL SHOWING—20 PSI.WE STOPPED THE JOB AND DISCUSSED A PLAN FORWARD.TO VERIFY WE WERE LINED UP CORRECT AND SOMETHING WASN'T PLUGGED OFF,THE KILL LINE WAS OPENED AND WE USED THE CHARGE PUMP TO PUMP ACROSS THE TREE AND GOT RETURNS AT THE SHACKER VERIFYING WE HAD COMMUNICATION TO THE WELL.WHEN WE SHUT DOWN THE CHARGE PUMP AND THE PRESSURE RETURNED TO 20 PSI AND WE KNEW THE ,SENSOR HAD TO BE RE-ZEROED.THE BAG WAS OPENED WITHOUT INCIDENT AND WE I CONTINUED TO PROCEED WITH LAYING DOWN THE BHA Printed 2/22/2011 5:09:22PM North America -ALASKA- BP Page 21 of 24 Operation Summary Report Common Well Name:6-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:20 - 21:15 0.92 DRILL P PROD1 LD DRILLING BHA PILOT MILL ON THE BIT WAS RUNG OUT AND THE CUTTERS ON THE WING WERE CHIPPED BIT GRADE=7-4 CORED W/CHIPPED CUTTERS REPLACED MWD DPS AND MU BHA WITH USED HYCALOG 3.75"x 4.25"BI-CENTER RAPTOR 21:15 - 21:30 0.25 DRILL P PROD1 PU INJECTOR AND STAB ONTO BHA MU INJECTOR TO WELL AND TEST TOOLS 21:30 - 23:15 1.75 DRILL P PROD1 GOOD TEST,OPEN EDC AND RIH WHILE CIRCULATING 23:15 - 00:00 0.75 DRILL P PROD1 TIE IN CORRECT DEPTH-37',CLOSE EDC AND RIH TAG BOTTOM OF WINDOW AT 10270',PU AND RIH CLEAN THROUGH WINDOW I '1 { CONTINUE RIH CONTINUE ON 11/17/2010 RON-14 11/17/2010 00:00 - 00:30 0.50 DRILL P PROD1 CONTINUE REPORT FROM 11/16/2010 CONTINUE RIH @ 10560' I :11350'ESTABLISH KRPS 1 BPM=1750 PSI 2 BPM=2512 PSI 'CONTINUE RIH TO TAG 00:30 - 02:40 2.1 7 DRILL P PROD1 TAG BOTTOM AND STALL,PU AND RESTART TAG @ 11394'TF @ 90°L FREE SPIN 3160 PSI @ 2.5 BPM ROP-60 FPH ' 2.6K WOB WI-VIA/OA/00A=44/642/0/0 PSI BHP/ECD/PVT:4703 PSI/10.14 PPG/330 BBLS 02:40 - 03:15 0.58 DRILL P PROD1 DRILLING FREE SPIN 3160 PSI @ 2.5 BPM ROP-65 FPH 1.4K WOB WI-VIA/OA/00A=51/760/0/0 PSI BHP/ECD/PVT:4740 PSI/10.20 PPG/328 BBLS 03:15 - 04:50 1.58 DRILL P PROD1 SHORT TRIP TO THE WINDOW PVT=326 _ I _ BBLS 04:50 - 09:00 4.17 DRILL P PROD1 DRILLING FREE SPIN 2850 PSI @ 2.65 BPM ROP-65 FPH 2.5K WOB WI-VIA/OA/00A=48/803/0/0 PSI BHP/ECD/PVT:4769 PSI/10.19 PPG/322 BBLS LOST 4 BBLS DURING THE TRIP DRILL TO 11697 FT. _ 09:00 - 11:00 2.00 DRILL P PROD1 WIPER TRIP TO WINDOW,START TRIP SHEET FOR 1000+FT WIPER. PULL PAST BILLET AT 0.5 BPM,OL TF. PULL THROUGH WINDOW AND RECIP PIPE, THEN OPEN EDC. PUMP 20 BBLS LO-VIS SWEEP IN 7"CSG WHILE EDC IS OPEN. NOTE: GEO HAS FOUND HOT IN SAMPLE AT 8953 FT TVD,SO WILL MOVE UP ABOUT 5 FT TVD FOR THE NEXT SECTION OF HOLE. PHASE 2 CONDITIONS FROM 09:30 ONWARDS. Printed 2/23/2011 10:33:39AM North America -ALASKA- BP Page 22 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site: PB B Pad Rig Name/No.:NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI: 500292007200 Active Datum:7:04 7/8/1970 00:00©59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 16:00 5.00 DRILL P PROD1 ,DRILL FROM 11700 FT. TURN UP TO 94 DEG TO GET ABOVE THE HOT. ROP IS 20-40 FT/HR WITH 2-4K DWOB. 2.51 /2.53 BPM @ 2800-3200 PSI. ECD= 10.28 PPG, PVT=321 BBLS. DRILL TO 11850 FT, ROP IMPROVES TO 90 FT/HR FOR THE FINAL 10 FT. 16:00 - 17:30 1.50 DRILL P PROD1 WIPER.TRIP FROM 11850 FT AND TIE-IN. CORRECT+8'. 17:30 - 18:00 0.50 DRILL P PROD1 DURING WIPER TRIP RECIEVE INFO THAT PHASE 3 WILL LIKELY BE CALLED SOON. ALSO CH2 IS NO LONGER HAULING FLUID EXCEPT WITH IMT PERMISSION. PULL INTO CASING AND PUMP 2x B/U,THEN GO TO A LOWER CIRC RATE 18:00 - 00:00 6.00 DRILL N WAIT- PROD1 CREW CHANGE PHASE 2 LEVEL 3 CONDITIONS,CALLED CTD OPERATIONS SUPERINTENDENT AND DISCUSSED SUSPENDING OPS UNTIL WEATHER CONDITIONS IMPROVE.ALL CI-12 TRUCKS HAVE BEEN PULLED BACK TO THE YARD SO WE HAVE NO FLUID SUPPORT.SECURITY • ALSO SAID LIFE FLIGHT WILL NOT BE AVAILABLE BECAUSE OF WEATHER CONDITIONS AS WELL. 11/18/2010 00:00 - 05:15 5.25 DRILL N2 WAIT PROD1 CONTINUE REPORT FROM 11/17/2010 CONTINUE WOW,CIRCULATING AT 0.5 BPM 1 AND MOVING PIPE EVERY 30 MINUTES 02:00 CALLED CH2 DISPATCH TO SEE IF THEY COULD PROVIDE FLUID SUPPORT BEFORE CONTINUING TO DRILL AND THEY COULD NOT.THEY GOT BLOWN IN PRETTY BAD AND SAID AT BEST THEY WOULD BE ABLE TO GO AROUND SHIFT CHANGE. CALLED OTHER RIGS TO CHECK THEIR I STATUS AND THEY ARE ALSO WAITING FOR FLUID SUPPORT BEFORE CONTINUING OPS 05:15 - 05:30 0.25 DRILL P PROD1 CH2 IS ABLE TO SUPPORT US IF WE NEED FLUID • CALL FOR PJSM WITH CREWS TO CONTINUE OPS 05:30 - 06:30 1.00 DRILL P PROD1 RIH TO WINDOW,CLOSE EDC AND CONTINUE RIH TO BOTTOM. TRIP IS CLEAN,SOME SLIGHT SET DOWNS. 06:30 - 08:30 2.00 DRILL P PROD1 DRILL FROM 11850 FT. HOLD AROUND 91 DEG INC FOR NOW TO SLOWLY GAIN TVD AND STAY IN BETTER SAND. 2.51 /2.52 BPM©3000-3300 PSI. INITIAL ROP IS 80 FT/HR WITH 2.3K DWOB. ECD= 10.44 PPG,PVT=293 BBLS. DRILL TO 12000 FT. 08:30 - 10:50 2.33 DRILL P PROD1 WIPER TRIP FROM 12000 FT TO WINDOW. r MOTOR WORK WITH 5K OVERPULL SEEN PULLING UP AT 11000 FT(TOP 24N SHALE). NOTHING SEEN GOING DOWN. Printed 2/23/2011 10:33:39AM North America -ALASKA- BP Page 23 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site: PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI: 500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To I Hrs I Task Code I NPT NPT Depth Phase Description of Operations (hr) (ft) 10:50 - 13:45 2.92 DRILL P PROD1 DRILL FROM 12000 FT. START TO REDUCE INC TO FIND THE HOT ONCE AGAIN. INITIAL ROP IS AROUND 80 FT/HR FALLING 'OFF TO AROUND 40 FT/HR AFTER 12020 FT. ECD= 10.41 BPM, PVT=285 BBLS. AFTER 12060 FT DRILLING WITH-8K STRING WT, DECISION IS MADE TO FURTHER REDUCE INC TO FIND THE HOT BEFORE WE RUN OUT OF AVAILABLE WOB. DRILL TO 12113 FT(ESTIMATED 8960 FT TVD) P/U AND CIRC A B/U SAMPLE UP. 13:45 - 15:00 1.25 DRILL P PROD1 PICK UP AND CIRC SAMPLE UP. GEO IS LOOKING FOR HOT WHICH IS FOUND IN THE 12113 FT SAMPLE. DECISION IS MADE TO CALL TD AT 12150 FT. ENOUGH CLEAN SAND HAS BEEN DRILLED AT THIS DEPTH TO SATISFY SIDETRACK REQUIREMENTS. 15:00 - 17:00 2.00 DRILL P ` PROD1 DRILL FROM 12113 FT TO 12150 FT. 17:00 - 18:20 1.33 DRILL P i PROD1 WIPER TRIP FROM 12150 FT TO WINDOW, CLEAN PASS GOING UP THROUGH THE SHALES. PULL PAST BILLET AT 0.8 BPM.OL IF. 18:20 - 18:40 0.33 DRILL P I PROD1 TIE IN 18:40 - 20:00 1.33 DRILL P PROD1 CORRECT DEPTH+10',RIH TO CONFIRM TD 20:00 - 20:30 0.50 DRILL P PROD1 'TAG BOTTOM AT 12158'.eU TO 11770'TO i_ CLEAN UP 21N SHALE 20:30 - 21:00 0.50 DRILL P T PROD1 POOH LAYING IN LINER PILL 21:00 - 22:10 1.17 DRILL P r • PROD? PULL INTO CASING AND OPEN EDC TO JET 7" AND CHASE TO TAIL 22:10 - 22:40 0.50 DRILL P PROD1 PJSM TO CHECK PRESSURE FLOWING THROUGH NORMAL FLOW PATH AND AT EQUAL RATES THE PRESSURE THROUGH THE MGS 22:40 - 23:00 0.33 DRILL P PROD1 START MGS TEST THROUGH NORMAL FLOW PATH 0.5 BPM=OPSI 1.0 BPM=7PSI THROUGH MGS .0.5 BPM=7PSI 1.0 BPM=20 PSI 23:00 - 00:00 1.00 DRILL P PROD1 MGS TEST COMPLETED,POOH EOP FLAG FOR LINER AT WINDOW PAINTED AT 7800'EOP 00:00 CONTINUE POOH AT 6900' 11/19/2010 00:00 - 01:15 1.25 DRILL P I PROD1 CONTINUE OPS FROM 11/18/2010 CONTINUE POOH FROM 6900'EOP FLAG AT 7800'FOR LINER AT WINDOW 01:15 - 01:40 0.42 DRILL P PROD1 OOH CHECK FOR FLOW AND HOLD PJSM TO LD DRILLING BHA 01:40 - 02:40 1.00 DRILL P PROD1 LD DRILLING BHA WELL TOOK 2 BBLS TO FILL 02:40 - 03:00 0.33 DRILL P PROD1 PJSM TO PUMP SLACK OUT OF COIL AND PUMP DRIFT BALL 03:00 - 04:00 1.00 DRILL P PROD1 200'OF SLACK IN COIL,PUMP SLACK OUT PUMPED OUT 190'OF SLACK CUT AND PREP WIRE TO CIRCULATE 3/4" DISCONNECT/DRIFT BALL Printed 2/23/2011 10:33:39AM North America -ALASKA- BP Page 24 of 24 Operation Summary Report Common Well Name:B-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/3/2010 End Date: X3-00WM2-C(1,284,890.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 05:00 1.00 DRILL P PROD1 PUMP 3/4"BALL BTT HAND"TROY"ON LOCATION NO BALL AFTER 1ST CIRC 05:00 - 08:00 3.00 DRILL P PROD1 BALL RECOVERED,MU BTT CTC AND PT. TOUR CHANGE. REVIEW LINER TALLY WITH DAY SHIFT. 08:00 - 11:30 3.50 DRILL N RREP PROD1 DURING THE SLOW CIRCULATIONS THROUGH THE GAS BUSTER A PINHOLE LEAK WAS OBSERVED ON THE DISCHARGE LINE BEFORE THE U-TUBE. DISCUSS PLAN FORWARD TO FIX THE LEAK WITH CTD SUPT AND BP SAFETY ADVISOR. PERFORM RISK ASSESSMENT AND PJSM. LEAK IS WELDED UP AND TESTED GOOD THE SECOND TIME. 11:30 - 12:00 0.50 DRILL P , j PROD1 CLEAN UP RIG FLOOR,PREP TO RUN LINER. FURTHER ENTRIES ARE ON THE CON EVENT FOR THIS WELL. Printed 2/23/2011 10:33:39AM North America -ALASKA- BP Page 1 of 9 Operation Summary Report Common Well Name:B-04 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00WM2-C(877,417.00) Project: Prudhoe Bay Site:PB B Pad Rig Name/No.:NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00©59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT 1 NPT Depth Phase Description of Operations (hr) (ft) 11/19/2010 12:00 - 12:30 0.50 CASING P RUNPRD PJSM FOR M/U LINER. 12:30 - 18:00 5.50 CASING P RUNPRD 11 . c - c• :111 SOLID 2-7/8 X 3-3/16 X 3-1/2 LINER STRING FROM TD AT 12158 FT WITH LINER TOP AT 9933 FT, INSIDE 4-1/2"TUBING. FILL LINER AFTER 2-7/8 AND AFTER 3-3/16 IS RUN. WHILE FILLING LINER PUMP A DYED SWEEP TO DETERMINE CT VOLUME, RESULTS ARE INCONCLUSIVE. FIRST TRACES OF DYE SHOW UP AT 47.4 BBLS, RETURNS ARE DARK PINK FOR ANOTHER 30 BBLS AFTER THIS. 12:00 - 12:30 0.50 CASING P RUNPRD PJSM FOR M/U LINER 1 12:30 - 18:00 5.50 CASING P RUNPRD M/U LINER AS PER PROGRAM. SOLID 2-7/8 X 3-3/16 X 3-1/2 LINER STRING FROM TD AT 12158 FT WITH LINER TOP AT 9933 FT, INSIDE 4-1/2"TUBING. FILL LINER AFTER 2-7/8 AND AFTER 3-3/16 IS RUN.WHILE FILLING LINER PUMP A DYED SWEEP TO DETERMINE CT VOLUME, RESULTS ARE INCONCLUSIVE. FIRST TRACES OF DYE SHOW UP AT 47.4 BBLS, RETURNS ARE DARK PINK FOR ANOTHER 30 BBLS AFTER THIS. 18:00 - 18:30 0.50 ' CASING P RUNPRD CREW CHANGE&PJSM TO CONTINUE LINER OPS. DAY CREW VERIFIED JOINT&THREAD PROTECTOR COUNT BEFORE LEAVING,ALL 2-7/8"&3/3/16"LINER IS IN THE HOLE 18:30 - 20:45 2.25 CASING P RUNPRD CONTINUE MU LINER VERIFY JOINTS OF LINER IN PIPE SHED ARE CORRECT AND THEY ARE MU 8 JOINTS OF 3-1/2"LINER COUNT ALL THREAD PROTECTORS AND VERIFY CORRECT AMOUNT FOR EACH SIZE. COUNT IS CORRECT MU 5 JTS OF PH6 'TUBING PU INJECTOR AND MU TO LINER TO RIH 20:45 - 22:10 1.42 CASING P RUNPRD RIH AT MIN RATE WITH TRIPS SET AT 1500 PSI PVT=248 BBLS 22:10 - 22:20 0.17 CASING P RUNPRD STOP AT 7800'EOP FLAG ELEC DEPTH READS 10236.4'AND MECANICAL READS 7844'. CORRECT DEPTH-44'WHICH IS CLOSE TO OUR NORMAL CORRECTION. BHA LENGTH IS 2392.65',CORRECT DEPTH TO 110192.7'WT CK 38K,RIH WT 15K 22:20 - 23:05 0.75 CASING P RUNPRD RIH TO BOTTOM PVT=292 BBLS 23:05 - 23:30 ' 0.42 CASING P I RUNPRD TAG BOTTOM,PU AND RE-TAG TO CONFIRM PU WT 46K PVT=301 BBLS TAGGED 3 TIMES AT 10148'PU TO BALL DROP DEPTH AND DROP CONFIRMED 5/8"STEEL BALL 23:30 - 00:00 0.50 CASING P RUNPRD BALL LOADED AND CONFIRMED ROLLING, RIH AND STACK 10K DOWN 100%RETURNS BALL OVER GOOSENECK AT 22 BBLS REDUCE RATE AT 70%TO 0.75 BPM CONTINUE CIRC LINER RELEASE BALL ON REPORT 11/20/2010 11/20/2010 00:00 - CASING P RUNPRD CONTINUE RIH LOGGING @ 10500' Printed 2/23/2011 9:55:48AM North America-ALASKA- BP Page 2 of 9 Operation Summary Report Common Well Name: B-04 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00WM2-C(877,417.00) Project:Prudhoe Bay Site: PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:00 - 01:15 1.25 CASING P RUNPRD CONTINUE REPORT FROM 11/19/2010 CIRC BALL TO RELEASE FROM LINER 00:10 NO BALL AT CALCULATED VOL 54.3 BBLS 00:20 NO BALL INCREASE RATE 62 BBLS 00:45 NO BALL PU TIO SEE IF LINER IS STILL ATTACHED AND IT IS 00:55 NO BALL REDUCE RATE PU 50'AND TAG BOTTOM HARD 105 BBLS 01:15 BALL ON SEAT 128 BBLS TRIPPED PUMP AT 4500PSI THEN SHEARED—15 SEC LATER 01:15 - 01:20 0.08 CASING P RUNPRD PU TO SEE IF WE ARE RELEASED PU FREE AT 36K,RIH AND SET DOWN 10K 01:20 - 02:30 1.17 CASING P - `RUNPRD SWAP WELL TO 2%KCL AND CALL OUT SLB CMT CREW 02:30 - 03:00 0.50 CASING P RUNPRD SLB CMT CREW ON LOCATION AND CHECKED IN.SPOT EQUIPMENT 03:00 - 04:00 1.00 CASING - P RUNPRD SLB EQUIPMENT SPOTTED,PJSM WITH CREWS TO RU SLB 04:00 - 04:40 0.67 CASING P RUNPRD SLB IS RIGGED UP AND WE ARE ALMOST FINISHED 04:40 - 06:30 1.83 CASING P RUNPRD WE ARE READY TO GO,WAIT FOR AFTER CHANGEOUT TO START TO AVOID A TOUR CHANGE DURING A CEMENT JOB. 06:30 - 07:00 0.50 CASING P RUNPRD TOUR CHANGE AND DAY SHIFT _ WALKAROUND. 07:00 - 07:30 0.50 CASING P t RUNPRD PJSM FOR BATCHING AND PUMPING CEMENT WITH SLB AND NORDIC CREWS, AND BTT HAND. DISCUSS JOB STEPS,CREW RESPONSIBILITIES,MUSTER POINTS AND WELL CONTROL. 07:30 - 08:00 0.50 CASING P RUNPRD START BATCHING UP CEMENT. 08:00 - 09:30 1.50 CASING P i RUNPRD CEMENT IS UP TO WT. START CEMENT DOWN CT WITH SLB PUMP UNIT. ZERO IN MM ON DENSITY CHANGE. AFTER 25.7 BBLS,SHUT DOWN CEMENT PUMP. LINE UP TO RIG PUMP AND DISPLACE WITH BIOZAN. RE-ZERO IN/OUT MM. SLOW DISPLACEMENT TO 1 BPM WHEN LEADING EDGE OF CEMENT IS NEAR LWP. AT 45.1 BBLS IN MM, CMT IS AT SHOE. ZERO (414 OUT MM, LEAVE IN RUNNING. AT 52.8 BBLS IN MM,2 BBLS OF CMT ARE LEFT ABOVE THE SELRT. PICKUP TO CT WT+13 FT. SET BACK DOWN 10K SURFACE WT,NEW DEPTH IS AROUND 10 FT HIGHER. SET PUMP TRIP TO 600 PSI AND PUMP SLOWLY TO SEAT PEE WEE DART. AFTER 0.5 BBLS NO PRESSURE, DART IS NOT SEATING. PICK UP AGAIN CT WT+ 13 FT,AND SET BACK DOWN. PUMP SLOWLY TO SEAT PEE WEE DART IN LWP, NO INDICATION OF IT SEATING AFTER ANOTHER 0.5 BBLS PUMPED. Printed 2/23/2011 9:55:48AM North America -ALASKA- BP Page 3 of 9 Operation Summary Report Common Well Name:B-04 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00WM2-C(877,417.00) Project:Prudhoe Bay Site: PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations ( ) 09:30 - 10:30 1.00 t CASING P . 7 RUNPRD [CALL ODE AND BTT SUPERVISOR IN I DEADHORSE TO DISCUSS PEE WEE DART NOT SEATING. DECIDE TO CONTINUE WITH THE SELRT PROCEDURE AS USE VOLUME TOTALS FOR DISPLACEMENT RATHER THAN RELY ON BUMPING THE LWP. PICK UP AGAIN ABOUT 2 FT AND SIDE EXHAUST 5 BBLS. OPEN BAKER CHOKE AND STACK 10K BACK DOWN. CLOSE BAKER CHOKE AND START DISPLACEMENT. AFTER 0.5 BBLS CT PRESSURES UP TO 3500 PSI AND DROPS, APPEARED TO HAVE SHEARED OUT THE LWP. PUSH LWP TO LANDING COLLAR AT 2.27 BPM. BUMP PLUG AT 15.8 BBLS(15.9 CALCULATED). HOLD 1000 PSI ON LWP FOR 2 MIN, HOLDING GOOD. BLEED OFF PRESSURE AND CHECK FLOATS, NO FLOW. PRESSURE UP TO 500 PSI AND PULL OUT OF DEPLOYMENT SLEEVE,PUMP 1 BBL BIOZAN HERE THEN POOH. TOTAL OF 22.7 BBLS CMT BEHIND PIPE. 10:30 - 12:45 2.25 CASING P RUNPRD POOH,MAINTAIN 0.5 BPM ON OUT MM. 12:45 - 13:00 0.25 CASING P RUNPRD I PJSM E0 1 1 1 INFR of ititiitin rnni c 13:00 - 18:00 5.00 CASING P RUNPRD TAG STRIPPER,TRIP SHEET SHOWS 0 GAIN/LOSS. i L/D 5 JTS PH6 AND LINER RUNNING TOOLS, 1TOOL HAS FUNCTIONED NORMALLY. RECOVER 5/8"STEEL BALL AND 8 PIECES OF 3/4"CEMENT STONES ON TOP OF BALL. OFFLOAD LINER RUNNING TOOLS AND EQUIPMENT. 18:00 - 18:45 0.75 CASING P RUNPRD 1 CREW CHANGE PJSM TO CONTINUE PICKING UP CSH 18:45 - 21:30 2.75 CASING P RUNPRD VERIFY ALL EQUIPMENT IS 100%BEFORE CONTINUING OPS CONTINUE RUNNING CSH l 19:30 CMT UCA @ 500 PSI 21:30 - 22:00 0.50 CASING P RUNPRD CSH RAN, MU 2 JTS OF PH6 PU INJECTOR AND MU TO BHA AND STB ON WELL 22:00 - 23:30 1.50 CASING P RUNPRD RIH CIRCULATING 23:30 - 00:00 0.50 ' CASING P RUNPRD 9600'BEGIN LOGGING DOWN @ 30 FPM TO !PBTD I RIH CLEAN THROUGH TOL CONTINUE REPORT ON 11/21/2010 11/21/2010 00:00 - 00:55 0.92 CASING P RUNPRD CONTINUE REPORT FROM 11/20/2010 CONTINUE RIH 10 @ 900' Printed 2/23/2011 9:55:48AM North America -ALASKA- BP Page 4 of 9 Operation Summary Report Common Well Name:B-04 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00WM2-C(877,417.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:55 - 01:05 0.17 CASING P RUNPRD TAG PBTD @ 12165'(UNCORRECTED)AT MIN RATE WITH A LITTLE MOTOR WORK PU AND TRY TO MILL AND SEE IF WE MAKE HOLE OR STALL RIH SLOW AND STALLED TWICE AT SAME DEPTH WAIT A FEW MIN FOR PERF PILL TO MAKE IT TO THE MILL 01:05 - 01:55 0.83 CASING P RUNPRD PERF PILL AT MILL POOH LAYING IN TO TOL STOP AT 11962'—200'OFF BOTTOM AND PAINT FLAG(EOP=9427') STOP AT 9835'BIT DEPTH AND PAINT(EOP= 7300') 01:55 - 02:20 0.42 CASING P RUNPRD 9600'END LOGGING RUN RETURNS ARE CLEAN ENOUGH TO KEEP LOAD 290 BBLS OF KCL BEFORE POOH 02:20 - 03:55 1.58 CASING P RUNPRD CONTINUE POOH 03:55 - 04:30 0.58 CASING P RUNPRD OOH FLUSij+HR'"CHOKE MANIFOLDS PJSM TO REMOVE INJECTOR AND STBK CSH 04:30 - 05:00 0.50 CASING P RUNPRD PU INJECTOR AND BREACK CONNECTION AT THE SWIVEL SET INJECTOR ON ITS LEGS 05:00 - 05:25 0.42 CASING P RUNPRD DROP 1/2"STEEL BAL TO SHEAR CIRC SUB 05:10 BALL ON SEAT AND SHEARED AT 2700 PSI,RD HOSE 05:25 - 09:00 3.58 CASING P RUNPRD START PULLING CSH AND STBK. PULL MCNL TOOL OUT AND CHECK,TOOL IS SHUT OFF. OFFLOAD TOOL TO MEM LOG VAN AND SEE WHAT DATA,IF ANY,WAS CAPTURED. 09:00 - 11:30 2.50 CASING P RUNPRD CLEAR RIG FLOOR AND PREP TO JET OUT STACK. M/U SWIZZLE STICK AND PICK UP INJECTOR, M/U TO RISER. 11:30 - 13:30 2.00 BOPSUR P RUNPRD DATA WAS CAPTURED ON DOWNPASS ONLY,AND IS INCOMPLETE ON THAT PASS. DATA QUALITY IS NOT GOOD ENOUGH TO CONFIRM PERF INTERVALS,AS PER TOWN GEO. GET NEW TOOL OUT FROM DEADHORSE. FUNCTION TEST BOP RAMS. 13:30 - 14:30 1.00 CASING N SFAL RUNPRD NEW TOOL ARRIVES. SLB MEM LOGGER STARTS PROGRAMMING IT FOR THE NEXT RUN. SMALL AMOUNT OF CEMENT DEBRIS WAS FOUND INSIDE THE SWIZZLE STICK WHEN IT WAS TAKEN OFF. M/U SWIZZLE STICK AGAIN AND PUMP 30 BBLS HI-VIS PILL FOLLOWED BY 1.5X CT VOLUME AT 3.5 BPM. RECOVER A FEW MORE SMALLER PIECES OF CEMENT. 14:30 - 15:00 0.50 CASING P RUNPRD PJSM FOR P/U CSH AND NEW LOGGING TOOL. 15:00 - 15:30 0.50 CASING P RUNPRD P/U BHA#16-MCNUGR/CCL WITH CARRIER, 1/2"CIRC SUB,5/8"DISCONNECT,78 JTS 1.25 CSH,3/4"DISCONNECT, DBPV,SWIVEL,2 JTS PH6. BHA OAL=2527.06 FT. Printed 2/23/2011 9:55:48AM North America -ALASKA- BP Page 5 of 9 Operation Summary Report Common Well Name:B-04 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00WM2-C(877,417.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.:NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA I UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.608(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 16:30 1.00 CASING N RREP RUNPRD ,TEST CROWN-O-MATIC,TRIPS OK BUT DOESN'T RESET. M/U SAFETY JOINT AND RUN IT IN ACROSS BOP STACK. PJSM THEN TROUBLESHOOT, REMOVE CYLINDER THAT HOUSES THE TRIP LEVER AND CLEAN IT OUT, RE-ASSEMBLE AND TEST,WORKING FINE. REMOVE SAFETY JT FROM WELL,CONTINUE M/U 1.25"CSH. 16:30 - 18:00 1.50 CASING P RUNPRD CONTINUE M/U 1.25"CSH, PERF PILL SCHEDULED TO BE ON LOCATION AT 00:00 18:00 - 18:25 0.42 CASING P RUNPRD CREW CHANGE 18:25 - 18:40 0.25 CASING P ' RUNPRD PJSM TO CONTINUE PICKING UP CSH 118:40 - 19:00 0.33 CASING P RUNPRD CONTINUE MU CSH 19:00 - 19:30 0.50 CASING r P RUNPRD PU INJECTOR AND MU TO LOGGING BHA 19:30 - 20:15 I 0.75 CASING P RUNPRD RIH CALL MI TO SEE IF THEY CAN SPEED UP THE DELIVERY TIME OF OUR PILL 20:15 - 22:00 1.75 CASING P RUNPRD REDUCE RIH SPEED TO WAIT FOR PERF PILL 22:00 - 22:20 0.33 CASING + P i RUNPRD PERF PILL ON LOCATION, RIH TO LOGGING DEPTH OF 9600' - _- 22:20 - 23:05 0.75 CASING G P RUNPRD_ BEGIN LOGGING DOWN FROM 9600'@ 30 FPM 23:05 - 23:45 0.67 CASING j P RUNPRD START PERF PILL 23:45 - 23:50 0.08 CASING P RUNPRD PERF PILL AT NOZZLE TAG PBTD AT SAME AS FIRST RUN 12165' PU TO UP WT AND PAUSE TO START LOGGING PASS UP 23:50 - 00:00 0.17 CASING---- P RUNPRD POOH LAYING IN PERF PILL AND LOGGING UP AT 60 FPM PAINT FLAG 200'OFF BOTTOM @ 9436.6 EOP 00:00 CONTINUE POOH @ 11400' 11/22/2010 00:00 - 00:35 0.58 CASING P RUNPRD CONTINUE POOH FROM 11400' 00:30 STOP AT 9827'TO PAINT 7300'EOP FLAG 00:35 - 01:30 0.92 CASING P RUNPRD 9600'END OF UP LOG INTERVAL,PAUSE AND POOH 01:30 - 02:00 0.50 CASING P RUNPRD 2000'PJSM TO REMOVE INJECTOR AND STBK CSH 02:00 - 02:30 0.50 CASING P RUNPRD OOH CHECK FOR FLOW,NO FLOW PU INJECTOR AN SET ON LEGS LD 2 STANDS OF PH6,MU SAFETY VALVE TO 1 JT OF PH6 02:30 - 04:00 1.50 CASING P RUNPRD STBK CSH 04:00 - 04:20 0.33 CASING P RUNPRD PJSM TO REMOVE LAST STAND AND SOURCE FROM MCNL TOOL - 04:20 - 05:00 0.67 CASING P RUNPRD PULL SOURCE TO FLOOR AND REMOVE FROM TOOL 05:00 - 05:20 0.33 CASING P RUNPRD BHA OOH, PREP FLOOR TO TEST LINER LAP WHILE DOWNLOADING DATA 05:20 - 05:25 0.08 CASING P RUNPRD WE HAVE DATA, SLB LOGGER DOWNLOAD Printed 2/23/2011 9:55:48AM North America -ALASKA- BP Page 6 of 9 Operation Summary Report Common Well Name:B-04 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00WM2-C(877,417.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM ;Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) I (ft) 05:25 - 08:00 2.58 CASING P RUNPRD PT LINER LAP TO 2500PSI PRESSSURE BLED OFF TO 2200 PSI IN 3 MIN PRESSURE BACK UP AND CHECK LUBRICATOR FOR AIR. TRY WITH MUD PUMP AND TEST 2 MORE TIMES, BLEEDOFF RATE EXCEEDS 10% AFTER 10-15 MIN WHICH IS A FAILURE AS PER CRT-10-45 SECTION 5C. 08:00 - 09:30 1.50 CASING P RUNPRD PREP RIG FLOOR TO RUN PERF GUNS. BRING PERF GUNS INSIDE AND SORT THEM. 09:30 - 09:45 0.25 CASING P RUNPRD PJSM FOR RUNNING PERF GUN. DISCUSS WELL CONTROL CONTINGENCIES AND PINCH POINTS 09:45 - 11:00 1.25 CASING P RUNPRD START M/U BHA#17-30 PERF GUNS,E-FIRE HEAD,5/8 DISCONNECT,28 STDS 1.25 CSH, '3/4"DISCONNECT,DBPV,2 JTS PH6. BHA OAL=2465.84 FT. 11:00 - 11:15 0.25 CASING ( P RUNPRD PERFORM KICK WHILE TRIPPING DRILL. P/U SAFETY JOINT AND LATCH IN ELEVATORS,M/U TO PERF GUNS. CONDUCT AAR WITH CREW THEN CONTINUE M/U PERF GUNS. 11:15 - 12:30 1.25 CASING P RUNPRD CONTINUE M/U PERF GUNS. 12:30 - 13:00 0.50 CASING P ' RUNPRD ALL 30 PERF GUNS IN THE WELL. PJSM FOR M/U 1.25"CSH. 13:00 - 15:00 2.00 CASING P ' RUNPRD M/U REMAINING CSH AND PH6. 15:00 - 17:30 2.50 CASING P RUNPRD RIH BHA#17. PUMP 0.46 BPM/220 PSI. CORRECT-28 FT AT FIRST FLAG, CONSISTENT WITH CORRECTIONS WHILE DRILLING. TAG PBTD AND GET UP WT 40K, CORRECT TO 12144 FT. 17:30 - 18:00 0.50 CASING P RUNPRD GET 2 RATES NEEDED FOR ACTIVATING THE E-FIRE HEAD. MOVE CT UP TO BOTTOM SHOT DEPTH OF 12120.7 FT. CIRCULATE HERE 0.45 BPM/250 PSI. WAIT FOR CREW CHANGE BEFORE STARTING PUMP SEQUENCE TO FIRE GUNS. 18:00 - 18:30 0.50 CASING P RUNPRD CREW CHANGE 18:30 - 18:45 0.25 CASING P RUNPRD DISCUSS JOB DETAILS WITH SLB ENGINEERS AND VERIFY DEPTH CORRECTION FROM MCNL AND CURRENT DEPTH CORRECTION. DEPTH CORRECTION FROM MCNL IS CORRECT AS WELL AS OUR CURRENT DEPTH.BULLNOSE AT 12120.7'WHICH PUTS THE BOTTOM SHOT AT 12120' Printed 2/23/2011 9:55:48AM North America -ALASKA- BP Page 7 of 9 Operation Summary Report Common Well Name:B-04 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00WM2-C(877,417.00) Project:Prudhoe Bay Site: PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI: 500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date ' From-To Hrs Task Code NPT i NPT Depth Phase Description of Operations (hr) (ft) 18:45 - 20:30 1.75 CASING P RUNPRD RIH 15'THE COME UP TO 2'BELOW SHOT DEPTH START E-FIRE SEQUENCE 'START MOVING PIPE UP AND GUNS FIRED WITH BOTTOM SHOT AT 12120.5' LINE UP DOWN THE BACKSIDE WITH THE CHARGE PUMP AND CLOSE THE CHOKE 44 PSI WHPCONTINUE POOH MONITORING FLUID DISPLACEMENT D.IPLACEM TAT 500'IS CORRECT-3 BBLS PERFORATED INTERVALS: 11500-11720 FT 11850-12120 FT 20:35 - 21:35 1.00 CASING P RUNPRD S AB -NNER-TOP BBLS DURING TRIP STOP FOR 30 MIN NO-FLOW CHECK 21:35 - 22:30 0.92 CASING P RUNPRD LINE UP TO FILL HOLE ACROSS THE TOP, HOLE TOOK 3 BBLS IN 30 MIN 21:40 POOH MAINTAINING PROPER DISPLACEMENT 22:30 - 22:35 0.08 CASING P RUNPRD STOP AND AND LINE UP FOR 30 MIN NO-FLOW CHECK 22:35 - 23:05 0.50-_,_ CASING P RUNPRD START 30 MIN NO-FLOW 23:05 - 00:00 0.92 CASING P RUNPRD GOOD NO-FLOW CHECK LINE UP TO FILL HOLE, HOLE TOOK 3 BBLS IN 30 MIN CONTINUE PULLING STANDS 11/23/2010 100:00 - 01:15 1.25 CASING P RUNPRD CONTINUE PULLING STANDS 01:15 - 01:45 0.50 CASING P - RUNPRD GUNS TO SURFACE,RUN STAND BACK IN HOLE,RU FARR TONGS 01:45 - 02:30 0.75 CASING P RUNPRD HOLD PJSM WITH TCP HANDS AND CREW TO I LD SPENT PERF GUNS ALSO GIVE A BRIEF AND PASS AROUND PRINTED PICTURES ABOUT THE PERFORATING INCIDENT THAT HAPPENED IN THE NORTH SEA 02:30 - 03:00 0.50 CASING P RUNPRD PJSM TO LD PERF GUNS 03:00 - 03:30 0.50 CASING P RUNPRD LD LAST STAND OF CSH 03:30 - 05:10 1.67 CASING P RUNPRD (PERF GUNS HAVE HOLES,LD SPENT GUNS CALL OUT BTT TO RUN LINER TOP PACKER 05:10 - 05:15 0.08 CASING f P RUNPRD PERF GUNS OOH,LOAD OUT SPENT GUNS 05:15 - 06:15 1.00 CASING P RUNPRD BTT HAND ON LOCATION WITH LINER TOP PACKER 06:15 - 06:35 0.33 CASING P RUNPRD DISCUSS LTP SETTING WITH ODE,THE MCNL SHOWS 2 TIC MARKS THAT COULD BE COLLARS 4'LOAD LINER TOP PACKER ON RIG 06:35 - 07:00 0.42 CASING P RUNPRD PJSM TO MU LTP BHA. SHIFT CHANGE. 07:00 - 07:30 0.50 CASING P RUNPRD M/U LINER TOP PACKER BHA#18. 07:30 - 09:50 2.33 CASING P RUNPRD RIH WITH LINER TOP PACKER BHA. Printed 2/23/2011 9:55:48AM INorth America -ALASKA- BP Page 8 of 9 Operation Summary Report Common Well Name:B-04 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00WM2-C(877,417.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase 1 Description of Operations (hr) (ft) 09:50 - 10:55 1.08 CASING P RUNPRD 'TAG AT 9967 FT AND PRESSURE UP CT TO 200 PSI. THIS CORRECTION IS CONSISTENT WITH EARLIER DEPTH CORRECTIONS. RECORD UP WT(36K)AND DEPTH, PICK UP TO BALL LAUNCH POSITION. LAUNCH 5/8"STEEL BALL WITH 800 PSI, CHASE IT WITH WATER AT 2 BPM. BALL IS HEARD ROLLING,OVER GOOSENECK AT 23 BBLS. SLOW TO 0.5 BPM AFTER 30 AWAY,BALL LANDS AT 41.3 BBLS. _ j7 / 10:55 - 11:10 0.25 CASING P RUNPRD OPEN CHOKE,SET 10K DOWN. L- 1 PICK UP TO CT WT+1.5 FT. PRESSURE UP CT TO 2000 PSI TO START_ l' SETTING PACKER ELEMENT. i SLACK 10K WT BACK DOWN,NOW 1.5 FT 1_4_ HIGHER,AS EXPECTED. l BLEED OFF CT PRESSURE AND START PT OF CT X TBG ANNULUS. 11.10 - 11:50 0.67 CASING P RUNPRD PT OF CT X TBG ANNULUS. OUTSIDE TEMP IS+30F. 11:11 264 PSI 11:16 260 PSI LOW PRESSURE TEST PASS 11:20 2007 PSI 11:25 2003 PSI 11:30 1996 PSI 11:35 1996 PSI 11:40 1996 PSI 11:45 1992 PSI 11:50 1992 PSI I ' HI PRESSURE TEST PASSES,SATISFIES ALL 3 CRITERIA IN CRT-AK-10-45 SECTION 5C. 11.50 - 12:00 0.17 CASING P I RUNPRD BLEED OFF PRESSURE ON WELL AND PUMP SIDE OF KILL HCR. PUMP DOWN CT,SHEAR OUT BALL SEAT AT 3700 PSI TO COMPLETE THE SET. PICK UP SLOWLY,4K OVERPULL UNTIL 'SEALS ARE OUT OF PACKER BORE. 12:00 - 14:00 2.00 CASING P RUNPRD POOH. START TRIP SHEET. 14:00 - 15:00 1.00 CASING P RUNPRD AT SURFACE. GET OFF WELL. UNSTAB COIL. LAY DOWN BTT RUNNING TOOLS. _ SPOT LRS PUMP TRUCK. 15:00 - 17:30 2.50 DEMOB N WAIT POST LRS PUMP TRUCK FAILURE. WAIT ON REPLACEMENT PUMP TRUCK.APOT REPLACEMENT PUMP UNIT. I I HOLD PJSM. RU PUMP TRUCK. PRESS TEST TO 3500 PSI. 17:30 - 20:00 2.50 DEMOB P POST RUN IN HOLE WITH NOZZLE BHA. LAY IN DIESEL FREEZE PROTECT FLUID FROM 2500'WHILE POOH. 20:00 - 00:00 4.00 DEMOB P POST PJSM.REMOVE BHA AND INSTALL PULL i j I BACK CABLE. -SECURE COIL TO REEL. 11/24/2010 00:00 - 02:00 2.00 WHSUR P POST FILL STACK W/DIESEL,PRESS TEST LUBRICATOR -TEST©250/3500 PSI,OK -SET BPV,UD LUBRICATOR. Printed 2/23/2011 9:55:48AM North America -ALASKA- BP Page 9 of 9 Operation Summary Report Common Well Name:B-04 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00WM2-C(877,417.00) Project:Prudhoe Bay Site:PB B Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 10/5/2010 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292007200 Active Datum:7:04 7/8/1970 00:00 @59.60ft(above Mean Sea Level) Date 1 From-To Hrs ' Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 04:00 2.00 BOPSUR P POST PJSM.REMOVE OLD REEL,INSTALL NEW ONE. -OPEN BOPE RAM DOORS AND INSPECT RAM RUBBERS,OK -REPLACE PACK OFF BRASS ON INJECTOR. 04:00 - 10:00 6.00 BOPSUR P POST 'PJSM. N/D BOPE. NU AND TEST TREE CAP. CONTINUE TO PREP FOR RIG MOVE. RELEASE RIG AT 1000 HRS. Printed 2/23/2011 9:55:47AM BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB B Pad B-04 - Slot 04 00 B-04APB1 ) 8, _ Survey: MWD Survey Report - Geographic 19 November, 2010 tik4'00 'WA ilk IP 3 • BAKER HUGHES Survey Report-Geographic LNTEQ bp Company: North America-ALASKA-BP Local Co-ordinate Reference: Well B-04-Slot 04 Project: Prudhoe Bay TVD Reference: 7:04 7/8/1970 00:00 @ 59.60ft(generic drilling ri Site: PB B Pad MD Reference: 7:04 7/8/1970 00:00 @ 59.60ft(generic drilling ri Well: B-04 North Reference: True Wellbore: PB-04APB1 Survey Calculation Method: Minimum Curvature Design: B-04APB1 Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB B Pad,TR-11-14 Site Position: Northing: 5,946,440.22ft Latitude: 70°15'36.475 N From: Map Easting: 662,094.05ft Longitude: 148°41'22.843 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.23 ° Well B-04 API No 500292007200 Well Position +N/-S 0.00 ft Northing: 5,949,909.04 ft Latitude: 70°16'10.172 N +E/-W 0.00 ft Easting: 664,034.50 ft Longitude: 148°40'24.192 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 38.00ft Wellbore B-04APB1 API No 500292007270 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2009 11/10/2010 21.95 80.92 57,704 Design B-04APB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,200.00 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°)? 21.60 0.00 0.00 46.71 Survey Program Date: 11/12/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 10,200.00 1 :Camera based gyro multisho(B-04) CB-GYRO-MS Camera based gyro multishot 10,254.00 11,357.00 MWD(B-04APB1) MWD MWD-Standard v�Y 11/19/2010 3:22:38PM Page 2 COMPASS 2003.16 Build 73 /situ BAKER HUGHES Survey Report-Geographic INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well B-04-Slot 04 Project: Prudhoe Bay TVD Reference: 7:04 7/8/1970 00:00 @ 59.60ft(generic drilling ri Site: PB B Pad MD Reference: 7:04 7/8/1970 00:00 @ 59.60ft(generic drilling ri Well: B-04 North Reference: True Wellbore: B-04APB1 Survey Calculation Method: Minimum Curvature Design: B-04APB1 Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft)', (ft) (ft) (ft) Latitude Longitude 10,200.00 27.50 70.00 8,624.12 2,968.38 3,065.26 5,952,943.31 667,034.13 70°16'39.360 N 148°38'54.928 W TIP 10,254.00 28.72 70.00 8,671.75 2,977.08 3,089.17 5,952,952.53 667,057.84 70°16'39.445 N 148°38'54.232 W KOP 10,280.94 32.83 70.00 8,694.89 2,981.80 3,102.12 5,952,957.52 667,070.69 70°16'39.491 N 148°38'53.855 W 10,307.76 32.48 86.50 8,717.52 2,984.73 3,116.17 5,952,960.76 667,084.66 70°16'39.520 N 148°38'53.446 W 10,337.61 34.51 104.50 8,742.47 2,983.10 3,132.39 5,952,959.48 667,100.92 70°16'39.504 N 148°38'52.973 W 10,365.93 33.79 121.74 8,765.96 2,976.93 3,146.89 5,952,953.64 667,115.55 70°16'39.443 N 148°38'52.551 W 10,397.95 37.75 111.56 8,791.96 2,968.63 3,163.60 5,952,945.71 667,132.44 70°16'39.362 N 148°38'52.064 W 10,425.88 43.17 104.10 8,813.22 2,963.16 3,180.84 5,952,940.61 667,149.79 70°16'39.308 N 148°38'51.562 W 10,456.29 48.96 97.18 8,834.32 2,959.18 3,202.34 5,952,937.10 667,171.37 70°16'39.269 N 148°38'50.936 W 10,487.69 56.50 92.43 8,853.33 2,957.15 3,227.22 5,952,935.61 667,196.28 70° 16'39.248 N 148°38'50.212 W 10,514.69 63.19 97.66 8,866.89 2,955.06 3,250.44 5,952,934.03 667,219.55 70°16'39.228 N 148°38'49.536 W 10,543.58 70.76 103.11 8,878.19 2,950.24 3,276.56 5,952,929.77 667,245.76 70°16'39.180 N 148°38'48.775 W 10,572.76 75.55 110.34 8,886.66 2,942.19 3,303.27 5,952,922.31 667,272.64 70°16'39.101 N 148°38'47.997 W 10,598.78 79.87 116.75 8,892.20 2,932.03 3,326.55 5,952,912.66 667,296.14 70°16'39.001 N 148°38'47.319 W 10,621.16 82.07 120.65 8,895.71 2,921.41 3,345.94 5,952,902.47 667,315.74 70° 16'38.897 N 148°38'46.755 W 10,650.46 87.51 116.44 8,898.37 2,907.48 3,371.55 5,952,889.11 667,341.66 70° 16'38.759 N 148°38'46.009 W 10,680.38 90.06 113.74 8,899.01 2,894.80 3,398.64 5,952,877.02 667,369.01 70° 16'38.635 N 148°38'45.221 W 10,709.50 90.74 110.21 8,898.80 2,883.91 3,425.64 5,952,866.71 667,396.24 70° 16'38.527 N 148°38'44.435 W 10,742.15 90.61 106.31 8,898.42 2,873.68 3,456.64 5,952,857.17 667,427.45 70° 16'38.427 N 148°38'43.532 W 10,780.71 90.09 102.49 8,898.18 2,864.09 3,493.98 5,952,848.39 667,464.99 70° 16'38.332 N 148°38'42.445 W 10,809.29 87.51 100.42 8,898.78 2,858.42 3,521.98 5,952,843.33 667,493.11 70° 16'38.276 N 148°38'41.630 W 10,840.82 84.77 97.35 8,900.91 2,853.56 3,553.05 5,952,839.15 667,524.28 70°16'38.228 N 148°38'40.725 W -10,874.36 83.39 95.01 8,904.36 2,849.97 3,586.22 5,952,836.28 667,557.51 70°16'38.193 N 148°38'39.759 W 10,919.77 82.95 101.81 8,909.77 2,843.38 3,630.79 5,952,830.67 667,602.21 70°16'38.128 N 148°38'38.461 W 10,954.19 81.46 106.37 8,914.44 2,835.08 3,663.86 5,952,823.09 667,635.45 70°16'38.046 N 148°38'37.498 W 10,985.03 83.17 108.88 8,918.57 2,825.83 3,692.98 5,952,814.48 667,664.77 70°16'37.955 N 148°38'36.650 W 11,008.85 80.43 108.64 8,921.96 2,818.25 3,715.31 5,952,807.38 667,687.25 70°16'37.880 N 148°38'36.000 W 11,034.78 77.39 109.30 8,926.95 2,809.98 3,739.37 5,952,799.64 667,711.48 70°16'37.799 N 148°38'35.300 W 11,060.70 74.08 108.62 8,933.34 2,801.81 3,763.12 5,952,792.00 667,735.41 70°16'37.718 N 148°38'34.608 W 11,087.60 71.74 106.99 8,941.24 2,793.95 3,787.60 5,952,784.67 667,760.05 70°16'37.641 N 148°38'33.895 W 11,115.34 70.95 104.11 8,950.12 2,786.90 3,812.91 5,952,778.18 667,785.51 70° 16'37.571 N 148°38'33.158 W 11,152.53 69.44 99.90 8,962.72 2,779.62 3,847.13 5,952,771.65 667,819.87 70° 16'37.500 N 148°38'32.162 W 11,185.49 67.26 96.65 8,974.88 2,775.21 3,877.44 5,952,767.89 667,850.27 70° 16'37.456 N 148°38'31.280 W 11,216.71 63.43 94.28 8,987.91 2,772.50 3,905.67 5,952,765.80 667,878.55 70° 16'37.429 N 148°38'30.457 W 11,246.02 63.23 90.77 9,001.07 2,771.34 3,931.83 5,952,765.22 667,904.73 70° 16'37.418 N 148°38'29.696 W 11,276.24 66.20 90.55 9,013.97 2,771.03 3,959.15 5,952,765.50 667,932.05 70° 16'37.415 N 148°38'28.900 W 11,312.20 69.62 91.03 9,027.49 2,770.57 3,992.46 5,952,765.76 667,965.36 70° 16'37.410 N 148°38'27.930 W 11,357.00 69.62 91.03 9,043.10 2,769.81 4,034.45 5,952,765.92 668,007.35 70° 16'37.402 N 148°38'26.707 W TD 11/19/2010 3:22:38PM Page 3 COMPASS 2003.16 Build 73 realm BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB B Pad B-04 - Slot 04 500292007200 B-04A Survey: MWD Survey Report - Geographic 1 19 November, 2010 II' BAKER , HUGHES Survey Report-Geographic • INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well B-04-Slot 04 Project: Prudhoe Bay ND Reference: 7:04 7/8/1970 00:00 @ 59.60ft(generic drilling ri Site: PB B Pad MD Reference: 7:04 7/8/1970 00:00 @ 59.60ft(generic drilling ri Well: B-04 North Reference: True Wellbore: B-04A Survey Calculation Method: Minimum Curvature Design: B-04A Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB B Pad,TR-11-14 Site Position: Northing: 5,946,440.22ft Latitude: 70° 15'36.475 N From: Map Easting: 662,094.05ft Longitude: 148°41'22.843 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.23 ° Well B-04 API No 500292007200 Well Position +N/-S 0.00 ft Northing: 5,949,909.04 ft Latitude: 70°16'10.172 N +E/-W 0.00 ft Easting: 664,034.50 ft Longitude: 148°40'24.192 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 38.00ft Wellbore B-04A API No 500292007201 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2009 11/10/2010 21.95 80.92 57,704 Design B-04A Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,840.82 Vertical Section: Depth From(ND) +NI-S +EI-W Direction (ft) (ft) (ft) (°) 21.60 0.00 0.00 59.78 Survey Program Date: 11/19/2010 From To (ft) (ft),, Survey(Wellbore) Tool Name Description 100.00 10,200.00 1 :Camera based gyro multisho(B-04) CB-GYRO-MS Camera based gyro multishot 10,254.00 10,840.82 MWD(B-04APB1) MWD MWD-Standard 10,865.00 12,158.00 MWD(B-04A) MWD MWD-Standard 11/19/2010 3:26:18PM Page 2 COMPASS 2003.16 Build 73 • • 100 BAKER Survey Report-Geographic t bp 1NTEQ "rooso. Company: North America-ALASKA-BP Local Co-ordinate Reference: Well B-04-Slot 04 Project: Prudhoe Bay ND Reference: 7:04 7/8/1970 00:00 @ 59.60ft(generic drilling ri Site: PB B Pad MD Reference: 7:04 7/8/1970 00:00 @ 59.60ft(generic drilling ri Well: B-04 North Reference: True Wellbore: B-04A Survey Calculation Method: Minimum Curvature Design: B-04A Database: EDM.16-ANC Prod-WH24P I Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) O, (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,840.82 84.77 97.35 8,900.91 2,853.56 3,553.05 5,952,839.15 667,524.28 70°16'38.228 N 148°38'40.725 W TIP 10,865.00 83.90 95.50 8,903.29 2,850.87 3,576.96 5,952,836.98 667,548.24 70°16'38.202 N 148°38'40.028 W KOP 10,897.76 82.57 93.80 8,907.15 2,848.23 3,609.39 5,952,835.05 667,580.71 70°16'38.176 N 148°38'39.084 W 10,928.53 80.69 90.56 8,911.63 2,847.07 3,639.80 5,952,834.55 667,611.14 70°16'38.164 N 148°38'38.199 W 10,957.79 81.31 86.81 8,916.21 2,847.73 3,668.69 5,952,835.85 667,640.00 70° 16'38.170 N 148°38'37.357 W 10,988.03 81.59 82.44 8,920.71 2,850.53 3,698.45 5,952,839.30 667,669.70 70°16'38.198 N 148°38'36.491 W 11,021.10 81.01 78.10 8,925.71 2,856.06 3,730.66 5,952,845.52 667,701.78 70°16'38.252 N 148°38'35.553 W 11,050.66 77.15 76.53 8,931.31 2,862.43 3,758.97 5,952,852.50 667,729.94 70° 16'38.314 N 148°38'34.728 W 11,089.64 72.82 79.54 8,941.41 2,870.24 3,795.79 5,952,861.12 667,766.57 70° 16'38.391 N 148°38'33.656 W 11,119.13 70.54 83.55 8,950.68 2,874.36 3,823.47 5,952,865.84 667,794.16 70° 16'38.431 N 148°38'32.850 W 11,152.11 71.64 89.90 8,961.38 2,876.13 3,854.60 5,952,868.29 667,825.24 70° 16'38.449 N 148°38'31.943 W 11,183.69 75.15 93.23 8,970.41 2,875.30 3,884.84 5,952,868.12 667,855.49 70° 16'38.440 N 148°38'31.062 W 11,216.39 77.67 98.39 8,978.09 2,872.08 3,916.45 5,952,865.58 667,887.16 70° 16'38.409 N 148°38'30.142 W 11,247.72 80.00 103.01 8,984.16 2,866.37 3,946.64 5,952,860.53 667,917.46 70° 16'38.352 N 148°38'29.263 W 11,273.10 82.60 106.53 8,988.00 2,859.97 3,970.89 5,952,854.67 667,941.85 70° 16'38.289 N 148°38'28.557 W 11,297.06 83.14 109.93 8,990.98 2,852.53 3,993.47 5,952,847.72 667,964.58 70° 16'38.216 N 148°38'27.900 W 11,327.64 85.70 114.62 8,993.95 2,841.00 4,021.62 5,952,836.81 667,992.97 70° 16'38.102 N 148°38'27.080 W 11,362.09 85.21 118.42 8,996.68 2,825.67 4,052.34 5,952,822.15 668,024.02 70°16'37.951 N 148°38'26.185 W 11,391.21 84.96 122.01 8,999.18 2,811.07 4,077.41 5,952,808.10 668,049.40 70°16'37.808 N 148°38'25.456 W 11,427.08 84.31 118.46 9,002.53 2,793.09 4,108.26 5,952,790.80 668,080.63 70°16'37.631 N 148°38'24.558 W 11,451.64 86.71 114.80 9,004.46 2,782.12 4,130.14 5,952,780.31 668,102.75 70°16'37.523 N 148°38'23.921 W 11,479.60 88.19 111.25 9,005.70 2,771.20 4,155.84 5,952,769.95 668,128.68 70° 16'37.415 N 148°38'23.172 W 11,512.11 87.61 106.14 9,006.89 2,760.79 4,186.61 5,952,760.21 668,159.66 70° 16'37.313 N 148°38'22.277 W 11,543.01 88.34 102.55 9,007.99 2,753.14 4,216.52 5,952,753.22 668,189.73 70°16'37.237 N 148°38'21.406 W 11,574.51 89.32 97.78 9,008.63 2,747.58 4,247.51 5,952,748.34 668,220.83 70° 16'37.182 N 148°38'20.503 W 11,607.36 87.70 94.26 9,009.48 2,744.14 4,280.16 5,952,745.61 668,253.55 70° 16'37.148 N 148°38'19.553 W 11,636.82 86.16 90.62 9,011.06 2,742.88 4,309.55 5,952,745.00 668,282.95 70°16'37.136 N 148°38'18.697 W 11,668.82 88.50 88.47 9,012.55 2,743.14 4,341.51 5,952,745.95 668,314.90 70°16'37.138 N 148°38'17.766 W 11,701.20 88.31 84.96 9,013.45 2,744.99 4,373.82 5,952,748.50 668,347.15 70°16'37.156 N 148°38'16.825 W 11,730.63 92.55 84.94 9,013.23 2,747.58 4,403.13 5,952,751.73 668,376.40 70°16'37.182 N 148°38'15.972 W 11,765.51 94.09 83.04 9,011.21 2,751.23 4,437.75 5,952,756.13 668,410.93 70° 16'37.217 N 148°38'14.963 W 11,795.65 92.12 78.51 9,009.58 2,756.05 4,467.45 5,952,761.60 668,440.52 70° 16'37.264 N 148°38'14.098 W 11,828.97 90.77 76.57 9,008.74 2,763.24 4,499.97 5,952,769.49 668,472.87 70° 16'37.335 N 148°38'13.151 W 11,871.01 89.45 71.49 9,008.66 2,774.80 4,540.38 5,952,781.93 668,513.01 70° 16'37.448 N 148°38'11.975 W 11,907.99 91.54 69.33 9,008.34 2,787.20 4,575.21 5,952,795.09 668,547.57 70° 16'37.570 N 148°38'10.960 W 11,940.62 90.92 73.87 9,007.64 2,797.49 4,606.16 5,952,806.05 668,578.28 70° 16'37.671 N 148°38'10.059 W 11,974.76 91.69 79.47 9,006.86 2,805.36 4,639.35 5,952,814.64 668,611.29 70°16'37.748 N 148°38'9.092 W 12,004.64 90.77 84.66 9,006.22 2,809.48 4,668.93 5,952,819.40 668,640.77 70°16'37.789 N 148°38'8.230 W 12,034.79 87.11 87.89 9,006.78 2,811.44 4,699.00 5,952,822.02 668,670.79 70°16'37.808 N 148°38'7.355 W 12,065.73 81.55 90.17 9,009.83 2,811.96 4,729.77 5,952,823.21 668,701.54 70°16'37.813 N 148°38'6.459 W 12,095.77 77.74 93.20 9,015.23 2,811.10 4,759.30 5,952,822.99 668,731.08 70° 16'37.804 N 148°38'5.599 W 12,158.00 77.74 93.20 9,028.45 2,807.70 4,820.02 5,952,820.92 668,791.85 70° 16'37.770 N 148°38'3.831 W TD 11/19/2010 3:26:18PM Page 3 COMPASS 2003.16 Build 73 4 TREE= 6"CIW g 0 4A Si 'NOTES: WELL ANGLE>70°@ 10544' WEt LHEAD= MCEVOY - ***4-.I/2"CHROME TBG' ACTUATOR= BAKER C KB. ELEV = 59.61' •••• ••�•• r BF.ELEV = 39.41' • •#Q 30"CONDUCTOR]-I 80' •• I I� I KOP= 3286' �••• .♦� 4 1998' 4-1/2"HES X NIP, ID=3.813" ••. •♦4 Max Angle= 94°@ 11766' ••••: ••4 Datum MD= 10472' 16"CSG,65#, -I 2116' 1 •-= 4.4' •�•� 2161' -113-3/8"DV PKR I• Datum TVD= 8800'SS H-40, ID=15.250" •••4•• ••�4 20"CSG,94#/133#,H-40/K-55, -1 2274' V. .k♦� 1-I ♦ ■ 2309' 1-110-3/4 DV PKR ID=19-24" 18.750" ••�• •1" 2389' H10-3/4"x 9-5/8"XO,ID=8.681" I 10-3/4"CSG,55.5#, N-80, ID=9.76" -I 2389' •• •� �j j� GAS LIFT MANDRELS 13-3/8"CSG,68#,K55, ID=12.415" -1 4332' O 14 ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3723 3706 20 KBG2 DOME BK 16 12/01/10 �� 7"TBG STUB(TAGGED 09/15/10 RIG) -1 6688' � 2 6643 5988 45 KBG2 SO BK 20 12/01/10 7"SCAB LNR,26#,L-80 BTC-M, .0383 bpf, ID=6.276" H 6691' 1 8687 7456 41 KBG2 DMY BK 0 09/22/10 7"TBG,26#,L-80 AB-U-45, .0383 bpf, ID=6.276" -1 6706' 6706' H TOP OF 7"PBR I ► 1/ ►-/ 7380' -I9-5/8"DV PKR I Minimum ID = 2.3" @ 9956' A 7380' HTOC IN 7"LNR(RIG 1978) I 4-1/2" KB LNR TOP PACKER 4 .4� pi 9814' H4-1/2"HES X NIP, ID=3.813" I rj ��. 9844' 1-17"X 4-1/2"TNT PKR,ID=3.856" :4 I11 9918' 1-I 4-1/2"HES X NIP,ID=3.813" I $ V 9956' I-14-1/2"KB LNR TOP PKR, ID=2.30" I 9965' --I3-1/2"DEPLOY SLV, ID=3.00" I :i IH 9987' I-i3 1/2"X NIP, ID=2.813" I 4-1/2"TBG, 12.6#,13CR 80 VAM TOP, H 9987' i /��� 0158 bpf, ID=3.958" •. 9987' H4-1/2"WLEG,ID=3.958" I �v■ -I ELMD TT NOT LOGGED I 3-1/2"LNR,9.3#,L-80 STL, .0087 bpf,ID=2.992" 10209' '•A• •Aki i♦V 44 171 10200' H ESTIMATED TOP OF CEMENT I 7"LNR,29#, N-80, .0371 bpf, ID=6.184" ^10260 ■♦•, �:4411 10209' 1-13-1/2"X 3-3/16"XO,ID=2.786" I ■9-5/8"CSG,47#,N-80, ID=8.681" H -10269 ♦'���� ����4 ` 4*0 MILLOUT WINDOW(B-04A) 10260'- 10270' �I4-1/2"X 7"WHIPSTOCK(09/28/10) I-I 10365' ♦; 4. • , S )����('_ 7"CIBP(09/20/10) H 10404' 11516' -13-3/16"X 2-7/8"XO,ID=2.441" `` / PERFORATION SUMMARY i! ...►*•*•w♦�♦�♦*i I.• REF LOG: MCNL/GR ON 11/21/10 • ►•�•jjjjj•i ■••••••• • ANGLE AT TOP PERF:88°@ 11500' •♦•♦•••♦•••♦•♦••• , 444,44444. Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 11500-11720 0 11/22/10 3-3/16"LNR,6.37"#,L-80 TCII, H 11516' I 2" 6 11850-12120 0 11/22/10 .0076 bpf, ID=2.80" PBTD --I 12147' 2-7/8"LNR,6.17#, L-80 STL, .0058 bpf, ID=2.441" H 12158' ass. DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNfT 03/12/78 ROW 36 ORIGINAL COMPLETION WELL: B-04A 09/24/10 D16 RWO PERMIT No:'2100950 11/24/10 NORDIC 2 CTD SIDETRACT(B-04A) API No: 50-029-20072-01 12/04/10 ?/PJC GLV C/O(12/01/10) SEC 31,T11 N,R14E,741'FNL&1599'FEL 12/04/10 PJC DRLG DRAFT CORRECTIONS 12/13/10 MK/PJC FINAL DRLG CORRECTIONS BP Exploration(Alaska) /16 REC FEB 0 3 ?O1 /al. & ici� 3v Conn CrSsion BAKER ?4W NG MUJGMESS Baker Atlas PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION(ALASKA)INC COUNTY NORTH SLOPE BOROUGH WELL NAME E-09CPB1 STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 2/2/2011 THIS DISTRIBUTION LIST AUTHORIZED BY: DEBBIE HOKE SO#:2862351 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION(ALASKA)INC 1 Company DNR-DIVISION OF OIL&GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE,AK 99508 ANCHORAGE,AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB CSC 3082A HOUSTON,TX 77002 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By:BAKER ATLAS-PDC 17015 Aldine Westfield,Houston,Texas 77073 This Distribution List Completed By: Spa,_006 Page 1 of I m INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage,Alaska 99501 REC PAW Attention: Christine Mahnken FEB 03 201 Reference: E-09CPB1 ifihdle &G Co w Cmission 4ncharap Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print—GR Directional Measured Depth Log (to follow) , 1 color print—MPR/Directional TVD Log (to follow) 1 color print—MPR/Directional Measured Depth Log (to follow) LAC Job#: 2862351 Sent by: Debbie Hoke Date: 2/2/2011 Received by: L" Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ 7260 Homer Drive BAICIER Anchorage,Alaska 99518 c:939 —0(4 S- IMMS Direct:(907)267-6612 INTEQ FAX:(907)267-6623 bp Date 01-08-2011 Transmittal Number:93175 4. .,- . _, _ BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) If you have any questions, please contact Doug Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 13-21A 000 -0400 403'4 05-08A ado-05- 9O(0 C-37B 910-GJC Ov(02 ° 18-10CPB1 a10-/d a 2005` 18-10C giO-t, 0 6 5- X-19BL2PB1 (9'4-)-1°- ao(as G-29B a/o- /44/ 00 6,(9q X-19BL2 0 w- 103 c)0(pc)O X-19BL2-01 aw-IOC 00 GQ d K-11A /U-( �O( Q3 B-04APB1 e)40-056_ g.O(od 9 04-22AL1 . ,iO - 164-1 ao00D B-04A 9,0-0 016- Q06t1 Please S' • . d Return one copy of this transmittal. Thank You, Doug Dortch Petrotechnical Data Center s Attn: C-et 's akr-l'od-tLA-e�.3(A•a-+- •Ir 550 West 7th Avenue, Suite 802 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage,AK 99519-6612 SIMI o ALASEA SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B-04A BP Exploration (Alaska), Inc. Permit No: 210-095 Surface Location: 741' FNL, 1598' FEL, SEC. 31, T11N, R14E, UM Bottomhole Location: 2042' FSL, 3213' FWL, SEC. 29, T11N, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, "24z(4116_\__ Cathyr P. Foerster Commissioner DATED this day of August, 2010. cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA ' ALASI' 'IL AND GAS CONSERVATION COMMI; N JUL, 2 3 2.010Aa3lD PERMIT TO DRILL 20 AAC 25.005 Alaska NI&Gas Csn2.Commission 1 a.Type of work: 1 b.Proposed Well Class: ®Development Oil ❑Service-Winj ❑Single Zone 1 c. Specify it,11Ohal'19gikosed for: ❑ Drill 0 Redrill ❑Stratigraphic Test ❑Development Gas ❑Service-Supply ❑Multiple Zone ❑Coalbed Gas ❑Gas Hydrates ❑ Re-Entry ❑ Exploratory ❑Service-WAG ❑Service-Disp ❑Shale Gas 2. Operator Name: 5.Bond: ® Blanket ❑Single Well 11. Well Name and Number: BP Exploration(Alaska)Inc. s Bond No. 6194193 PBU B-04A 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12154' ND 8985'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028310 741'FNL, 1598'FEL, SEC 31,T11N, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2210'FSL, 1430'FWL,SEC 29,T11N, R14E, UM _._ October 1,2010 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 2042'FSL,3213'FWL, SEC 29,T11N, R14E, UM 2560 28470' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 59.6 feet 15.Distance to Nearest Well Open Surface: x- 664034 y-5949909 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 740' 16.Deviated Wells: Kickoff Depth: 10428 feet 17.Maximum Anticipated Pressures in psig(see 20 MC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3315 Surface: 2435 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 4-1/8" 3-1/2"x 3-3/16" 9.3#/6.2# L-80 STL/TCII 2250' 9900' 8302' 12150' 8984'ss 121 sx Class'G' x 2-7/8" /6.5# 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 10940' 9262' 9822' 10693' 9048' 10631' Casing Length Size Cement Volume MD ND Conductor/Structural 2274' 20" -250 sx Cement(Approx.) 2274' 2274' Surface 2116' 16" 4000 sx Permafrost 2116' 2116' Intermediate 4332' 13-3/8" 1700 sx Class'G' 4332' 4244' Production 10899' 10-3/4"x 9-5/8" 1400 sx'G'.725 sx'G'.400 sx'G'. 500 sx'G' 10899' 9227' Liner 4078' 7" 476 sx Class'G' 6706'-10784' 6033'-9127' Perforation Depth MD(ft): 10473'-10635' Perforation Depth ND(ft): 8861'-8999' 20.Attachments: ❑ Property Plat 0 BOP Sketch 0 Drilling Program ❑Time vs Depth Plot ❑Shallow Hazard Analysis ❑ Diverter Sketch ❑Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the fo• •.ing is t e an. correct. Contact Sean McLaughlin,564-4387 Printed Name Joh-�d I/ Title Engineering Team Leader � // Prepared By Name/Number Signatu Or Phone 564-4711 Date 7/2e�o Terrie Hubble,564-4628 Commission Use Only Pe ' • i rill API Number: Permit pv I Date: See cover letter for Nu r:vl/fJQ�,j _ 50-029-20072-01-00 other r requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: I� Other: 3500 fps O /e5+ Samples Req'd: ❑,Yes I!0 No Mud Log Req'd: ,Yes 'No Z SOS psL h n S/_ (.:41-12S Measures: Yes ❑No Directional Survey Req'd: Yes ❑No Date 04-1- /G ��X ` t p APPROVED BY THE COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 months from the date of,�pproval(20 MC 25.005(g)) Submit In Duplicate ORIGINAL .74_, 727 ,o ,00 ,w, BPXA Prudhoe Bay B-04A CTD Sidetrack July 16,2010 b p CTD Sidetrack Summary Pre-Rig Work: (scheduled to begin after the RWO-September 10, 2010) 1. S Pull ball and rod 2. S Pull RHC sleeve 3. S Run dummy WS drift to top of CIBP (-10435') -10435') --9 s' 61-4'4" Rwo 4. E Set Baker whipstock at 10,410' and highside. GR/CCL Log across TT, Packer, and Nipple. 5. W AC-LDS; AC-PPPOT-T 6. V PT tree (MV,SV,WV) 7. 0 Bleed gas lift and production flowlines down to zero and blind flange 8. 0 Remove S-Riser, Remove wellhouse, level pad Rig Work: (scheduled to begin on October 1, 2010) 1. MIRU and test BOPE to 250 psi low and 3500 psi high 2. Mill 3.8" window at -10410' and 10' of rathole. • 3. Drill pilot hole: 4.125" OH, 950' (38 and 12 deg/100 planned) ✓ 4. Open hole sidetrack -10960' Drill Lateral: 4.125" OH, 1200' (12 deg/100 planned) • 6. Run 3-1/2" x 3-3/16" x 2-7/8" solid L-80 liner leaving TOL at 9900' • 7. Pump primary cement leaving TOC at 10200', 25 bbls of 15.8 ppg liner cmt planned • 8. Cleanout liner and MCNUGR/CCL log 9. Test liner lap to 2000 psi. - 10. Perforate liner per asset instructions (-500') • 11. Freeze protect well, Set BPV, RDMO Post-Rig Work: 1. Pull BPV 2. Re-install wellhouse and FL's. 3. Generic GLV's Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg Geo-VIS for milling and drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4.125" (bi-center bits used) Casing Program: fully cemented liner • 3-1/2", L-80 9.3# STL 9900'- 10300' and . • 3-3/16", L-80 6.2# TCII 10300' - 11500' and • • 2-7/8", L-80 6.5# STL 11500'- 12150' and • • A minimum of 25 bbls 15.8 ppg cement will be used for liner cementing. • TOC planned at 10200'. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Maximum planned hole angle is 90 deg at 10620'. • Magnetic and inclination su, ,rs will be taken every 30 ft. No gyro will be .un. • Distance to nearest property line—28470 ft. • Distance to nearest well within pool—740 ft. to B-07 in Ivishak Anti-Collision Failures • B-27— 1053 ft. ctr-ctr; P&A'd • B-27A— 1202 ft ctr-ctr; Shut in due to high GOR • B-28—1150 ft ctr-ctr; Shut in Injector, deep plug set Logging • MWD directional, Gamma Ray, and Resistivity will be run over all of the open hole section. • Cased hole MCNL/GR/CCL will be run. Hazards • The maximum recorded H2S level on B Pad is 400 ppm on well B-34. • No fault crossings expected, calculated risk of lost circulation is low. Reservoir Pressure • The reservoir pressure on B-04A is expected to be 3,315 psi at 8,800'TVDSS. (7.3 ppg equivalent) • Max. expected surface pressure with gas (0.10 psi/ft)to surface is 2435 psi. Sean McLaughlin CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble . • _ O O O O O co _) O 0 0 CO 0 0 N- I •i O O O O O r- O 0 O O co co O O 0 0 0 0 o ai 0 •a- o r` � 0 m 0 o v Die I CO N c!) b O 0) CO 0) 0) O O m 41'd a '., R e - el w U 1 v 6 zcs p) N O (n c0 co r` r r O r IU: h N O N Q O R N a` N N N N N N N N N N N N M M M 0 co o V O N m O _ p 7 C _O j O N 65 (0 j Oa) 7 CO 0 too 0 O O O O 0 O O 0 0 O 0 0 ,-CO U M O O O N N N N N N V W o M M M M M .- a- a- N 0 m h- 7 N O_ 0) O (0 O N E 2 J co CU N .. i .0 ❑ O° 2 N I- w '''''' • O V O N M 0) N- R O CO N O 0 O LO o 'O O) N- O N CO CO CO a- N N- 0 a- CO O) C 0 in O) O) O N _ CO N O u) co c0 c0 M t N N CO O CO c- CO CO CO N- O R N V 7 a) C `-- <- ,- ,- ,- N N N CO CO 'Q u) (0 0 N- r CO CO CO C` r` CO CO r` r C` r r` C` d C �' O CO CO CO CO CO O CO CO CO O CO CO CO CO C CO O CO CO CO CO O CO CO O CO CO CO CO CO at • o W v m O S o d C - L Q • C - V 1= O O N u) N- V N CO CO N- h 01 w R 7 O 7 co V O CO N CO 0 N- CO R O O•O ! d 0 0 a O O V N CO O in N_ O O N O O0 d T 07 0 O) N- co CO 0 0 O N- N CO N- N- CO CL O O O co O 0 0 O O O O co co co co To 0O> m 0)) LU inn LU to t L LU 0 10 LA (NI LU LU (NI LU D 0 ~ Z M Lam` C v O a) a) a) O a) a) O a) 0) O O a) 0) 0) a uj co C a C Z Sri cri �i 0 0 0 0 )ri 0 Sri 0 ui ui .z C C m co Z c 'C O co 4. N- N CO 7 O V CO N CO N E ❑ ^ co CO CO N V 0 N- LO O N O M (• _O O V V O V N u) O O O M Q. 0 U to O r` N V M O 0 O r LO h h W f•-•4 — N N N M CO M tt V LO CO CO V x co M M C) M M M C) M M C') M C) M C) T7 H W— d L U) co r` O O CO N CO M O CO O O O O V O N r O CO CO O O CO CO LC) CO O M al N CV 4(7 M O O M O O CO O )_ O Q O O O O O O N O M CO O O O O CO O O CO CO O CO CO Y CD C › ❑ y M M M M CO' CO' CO. M N N N N N N N Z CO H U 2 N- N O CO N- 0 O CO O CO CO 0 N CO c!) V co V V V O V V O O O O O C 9 O cP) N O M O O O O cO O M m co 7 O N CO CO CO CO V V V 0 r CO N- N. r` O O co co co co co co co co O O o O O O O O O O O O co' O co" O O O 0 7 E m_ o a > o 0 0 o v co LU O o O 4 O O O O V o in co O O CO r CO M M 0 O 9 O O O O O O O M O O N- c!) co O 0 O N m h N- n r ` N- O 0 M N 0 CO O O 03 „j y_ m O 2 2 N Q„' O Cr a) N j c O g U c _ r O O V V' V' O Lo N 0 0 V O 0 0 Q (n r' E. O O co V 7 O O O CO CO 0 0 LOU) m d 0 0 N O O O LU O O O O r` O co d co M co N c!) O C0 CO O O CA CO CO CO CO CO N-- U 03 o O O c00 0 J 0 N co -p O V M C !_ 0 O Q O o_ m co ~ O O 02 , 9 . . A d 0 2 Z O a co O d C O 0 0 0 O o O o v v co o 0 0 v 0 0 CO a �' O O O 0 0 O O O O O cy O O O O O O e} d o o d 0 0 0 w o 0 0 0 r- C) w o O O 0) 0 0 0 O O N 0 O O N 0 CO O O 0 0 r� O O Cy Iiil O 3 V 1 V' .O C LO LO O O CO . r� CO CO O O ui o ° o v o O o CO 0 0 0 0 0 CO 0 0 0 0 aU `o = ar u. „ 2 — H ' Y '- w' v'— u)— — co— W — — — - co- 0 d .. .0 O) ca cy vi- c) ain330 m a M _ o O 0 0 0 r W 0 .... 0 0 0 0 Odom a) la �W� cocas co 0 O 0 co z m W U `-' C`i 0 ~ O Z C N O) CO co LO N in o co co V 0 O 0 9 N- ,- V I: 00 N co Z O ❑ O OM M o.-) co) co) t O O N N �` N —_ M M M CO CO CO U o 0 N > O _ 00 7 C • TI.) ( Co - O 0 0 0 0 0 _J N. � (° O O 0 O O O csi V (O O N - r O u) N. 7 N O7= _ w O . @ 0 7 - 2 J O 0 O 0) N--- M•U - V 0 m N C ` 0 M co 0) N N in N- CO 0 CO 00 0) 0) 0) w N N N N n N- N O 2 y g CD (O GO CD CO (D C CO (0 CO CO CO co as w O W l0 . O .,c C Cl) O R (O U U y C C C i 0 CO in CC) O N M .O. d Q O i 0.) 16 tt (A co O O D) .- t 0 CC d �• INO 01 co CCo 0 0 0 W To Ce t a) ' � _ • p j ❑ 0 3 io rn rn in rn rn rn a aJ F- 2 Z co ❑ O to (n 0 (n u -J ) z .0 N Z C CO 00)) CO M 0 0 0) 0 �0�--y (MO CO Co D) LU 0 V 2 F (.5 M M M M W 2Z 0 L Y CO N r--- (0D (°) N CD LO a) in in m co in W = oo (00 co O co co (T ` m N N = N N N N N N Y Z CO m coo 000 N- N O 00) V (D 4 N- co O CO 0) rn rn rn rn 0) coCO (O 00 c co 00 > F co co co M M co (O CO (O (O (O (0 m Cr) O) 0) 0 O) a CO 'a' CO Q 0 M (n W Q m in O N In CO in d (On) in (0 ° N CDD U >. CU CO 0 O C v m • d 0 O L• O L 9 O ` m O N N O Z Cal Z a (1 DYE d A 00 O 0 O 0 0 CO co co co d 0 �r� O 0 (0 O O p o f 1 7 N ON N CO M CO CD ( os 0 • U O C d O- d � co C O O C N B « _ N tDia` v) 3 0 0 N. I N W I : 1 m .w; „' • g a _ ym o m wF1 , M El s C4 V 03 0 o` ac , 1 q„ g g to o a y R E 8 ° pip n s c ` a _I i'' o $ F yV q E -- ref cn en liArl ,W u at laglA CO en ° o I ° y Y o , _ r co a a en a m en 0 3m c cn W m~ - _ ,�yy- �Y _ t��Yy,,, Rpq -§ o CO cf CI 3 R o to 3` 2 2 `� '�� _ 4 0 ° 0 r ro z a 5 *777 tl O 1 15 co ¢. TO m o cs a p 7 a —m O r F-Y W Q L.CO W m en.-.-H• .< y pp p� �$,n °ot Ng q1 ONN Om <mm gyqpq}' .n CJ >NN NCOOCO NO CO CO CO cn us ./'i 3 R NN N 23 23 C 3 LLU 0 0 O 0 0 0 0 0 0 0 99 o es �N F° Cnm 0Om°°m N O O m N.- mm °N y( a.Qa �b b 1` R m a y ..o . m 4 m mo OO°o - m q m o o C.,°cn CO CO n N N N N La Nm .N 2m 12 e 3°'0mlo<I,e aamaa. Z 'w� r C,en aN3 mN a $3. m Mm Mngn.•°n.-% r a. .. i. ii r,im r:v N m g N S a u *ggg00082N5`N$NNZ wo 3 W �n CO o $$ VJ or-.arn.°0,rn°CMr_r_rn CI�W �'mm mmmmmmm�m'N° J I 1 \ - C. CO o / I / I o ^d O OO O o`B lnaea Al ca ca ca ca 0€S ^I--I.-I-- oc°n ao.m...E ai . a_ iX' Ntot000 mmmocn "Eg ea CO CO ommuam�m ID 3$ °°°°°v o°o ° CD o o o o o o o N CO CO o CO CO $�* ggag0000mm $ $ g 1 3 og g CO CO m m - N 2 1 y'-N C7 V N mC-m OO; (U?B 0£)TdaQ iro►uan axuZ MU BPPASSPORT hh HUBS Travelling Cylinder Report bp IINTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well B-04-Slot 04 Project: Prudhoe Bay TVD Reference: 7:04 7/8/1970 00:00 @ 59.60ft(generic drilling rig) Reference Site: PB B Pad MD Reference: 7:04 7/8/1970 00:00 @ 59.60ft(generic drilling rig) Site Error: 0.00ft North Reference: True Reference Well: B-04 Survey Calculation Method: Minimum Curvature Well Error: O.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 5,B-04APB1 Database: EDM.16-Anc Prod-WH24P Reference Design: Plan 5 Offset TVD Reference: Offset Datum Reference Plan 5 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 10,400.00 to 11,360.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,333.84ft Error Surface: Elliptical Conic Survey Tool Program Date 7/14/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 10,400.00 1 :Camera based gyro multisho(B-04) CB-GYRO-MS Camera based gyro multishot 10,400.00 11,360.00 Plan 5(Plan 5,B-04APB1) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 11,360.00 9,040.59 . 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB B Pad B-02-B-02-B-02 Out of range B-02-B-02A-B-02A Out of range B-04-B-04-B-04 10,449.70 10,450.00 2.51 24.02 -20.58 FAIL-Major Risk B-04-Plan 4,B-04A-Plan 4 10,925.00 10,925.00 0.44 0.68 -0.23 FAIL-Major Risk B-05-B-05-B-05 Out of range B-05-B-05A-B-05A Out of range B-07-B-07-B-07 Out of range B-22-B-22-B-22 Out of range B-22-B-22A-B-22A Out of range B-22-B-22A-Plan B-22A Wp03 Out of range B-23-B-23-B-23 Out of range B-23-B-23A-B-23A Out of range B-27-B-27-B-27 11,352.85 10,150.00 1,218.31 1,190.45 50.77 Pass-Major Risk B-27A-B-27A-B-27A 11,350.00 10,150.00 1,218.49 1,183.74 57.86 Pass-Major Risk B-28-B-28-B-28 11,350.00 10,825.00 1,131.07 1,215.25 229.79 Pass-Major Risk B-36-B-36-B-36 Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 7/14/2010 4:13:46PM Page 2 of 8 COMPASS 2003.16 Build 71 M 0 0 0 c0 0 0 0 0 N- 0 0 CO 0 i IN C 0 0 0 c0 0 0 U) 0 0 (0 O O N 0 AlagZ 0) O O u v Pi o o o O o of ( 0 .O 7r C 4 O V 7 7 0 U 0) V V M N N a) 1 m ..ii m=d U N o co W U F.. fh la.zc N co 0 co 6 in co co O c)7 co in V N- co Co V M co N O) M V CO O N O M O CO _0 O O O M V O 6 U N O a) 6 O a • ❑ N O 6 00 o O 7 O a) W • N ) O M O M M M M N N M M N M M M M M 7 V M M M M p U V D y o O 0 a O — O 0 C o a m u) ai J a) 7 0 0 O O O O O O O O O O O O O �' (6 0 O O N N N N N N N N N N N N N o• CO ro CO E N 07 r r .- r r el 2 N a) ❑52 - 1- w _. in N 0 00 U) 0 0 0) c0 .4 co co 6 CO 0 •i 7 U) N U) CO O N 0) N V CO c0 C O N N- N- O V c0 (O M O 4) O Q7 0) t V O V 00 V o N M n CO N C CV 0 C co CO c0 CO N- I,- N- CO CO 00 0) O 0 � (0 (0 (0 (0 o O O 0 'd Y= o CO CO CO CO CO CO (O CO c0 (O CO O CO C R... (0 O o CO CO CO (O CO (0 (0 M O CO (0 0 co 0 :. W CO C t0�1 0 C - C = D 0 c m 0 .-N. a) co V 1- O M CO CO CO M M W 4 d a N 7 co co 0 CO r — r V in CD M O M U) O w 0 0 V N E U) O O CO N • N O (n 00 V a) c1 0 Y' �' T C6 Of O N- N- n N- O W 0 co N- CO CO c0 U) o d' r2 t a) .0 o c o0 0 co co 00 0 0 co co 0o 0o 0o 0o 0o 0.a) 0 :� 0) o (Nn (Nn in a) (Nn (Nn (Nn (Nn (Nn (Nn o O 7 W N (6 �'`•' a) a) Q) a) a) a) a) 0) a) Q) a) 0) Cr) 0) J Z CA D c Ui i U i (C) 0 ) I i (ri (i Ui 1.6 ui Ui W c • c Z o▪ 00 (o ca co co Z •C' a f0 v o co U) CO U) 0) V (o U) M 0 (c) N ° ❑ ❑ N N CO N O r N- CO CO N > o r O O M O (0 U) N 0) 00 00 00 U) a 0 (0 > N- co N- V N- (n (0 0 U) U) N- 6 CD //Yy 0 0 2 2 U) CO CO N r W 00 N CO 0) 0 0 • V . M M M M M M • C) C) M M V NE 4 LLI 01 W... 3 Z I. 6 (I) ID L CO 00 00 M CO CO 0) M (O r M N 0 CO V N- CO 0 r U) N V 0) R CO O C') co co ai co o co 0 m 1 A rY 0o co co o co co co oo co 0o co co co co co Z • 0 N N N N N N N N N N N N N N Y 0 Z'al CO 10- 022 O N- ,- N- 0 <- CO v V a) Co ,- c0 co V O N .- U) h O in U) V U) 00 o a) a) 9 (n O R o N- co N N O O 0 a a m m V V U c0 c0 r 0) co V U U U Cl) 00 00 o 00 CO 00 co a) 0) a) o a) a) a) o Q cc 00 00 00 00 M cc co 6 00 00 00 o O N ' 7 ~ E m_ O a m< V c0 O N M �' U) oo N 00 00 0 0 (0 N- a) ,- Co co co co N 0 M N- 0) CO V y O O (ri C') • co (O r 0) c0 h O 0 O m a) o N m m 0 a) a) 00 00 Co CO a) a) O a) a) 00 a) a W (A V' yy r n- 0-m 0 c6 N cc66 Q 0 0 <Z d CV(n V' a)• c6 0 V z • mac R.' 00 N- V O U) (n co O R O O Q to d a o 0 0 co 0o a) v in v .- v 0) co co 0) o 0 a) h (ri N- 4 O (0 (0 N. - 1� 1� 0 0 O o V O W Cl) 00 N- N- N. CO CO CO N N- 00 a) a) U co o ❑ 0) o O O co C) 0 m -a O V 0) C p Q O a m ~ 0 0 O V V .c 03 Z 0 0 0) d 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 o D o rn o (a Q O O N O O O O O O co O co O d• O o a. O O ..- O (t) U) 0 0 O O O 0 O O O Cy V a1 O O O O M CO O V a) co a 0 0 0 C') Jo O 3 o d o ,O 0 0 O N N M V R U) c .. H LL � � y g o Y° 11 (n' et v-• '- (n'- (o'- '— n v- v- co` o a n° o) m C o C •O:.- 0 0 d 7 W �V c> av) 33o cn a III N 0 0 0 0 0 0 1.0 0 Co 0 0) N. iii C 0 0 0 0 0 o Co 0 v o Ob 0) o 0 0 o N- Co o rn o m Ems c rn rn o CT) o 0 o rn co rn ao m -`= 0 -0 R e co m W '3 <L C i F ~ °o z C) C/) V co N- O) N- CO Co Co N- O (0 CO co CC) O co Co co 0 o Q co L N r N.: V Co N Co CO Co 0 CO co N co co o C) O O N 0 a` y d co- M M M M M • �t sf �7 0 LJ D N w O a) co N 0 - 00 7 C O 0O CD ) C0 J C)N. 7 Co 0 0 0 0 0 0 0 0 0 0 0 ca V a) co 0 O N N N (N N N N N N N N 0 m r 7 N m V O _ �• VO w ,E 2 J d O 2 r` F- - W p ... a) N Co 0 CO CO C) Co 0 CO Ns CO O V N. N Co M CO M o O) C O M Co V V V M N O O) M N L 0 NN N N N V CNn C0 CCOO CO. t- n w N M Co Co Co Co Co co- CO Co Co Co N = CO co co Co CO CO CO CO CO CO CO d' C CO co CO CO Co CO CO Co CO CO CO Co G) • O W co C 0 0) C . C 7 - 0) a) i9 N CO co cv CO 0 x- x- N - co N N- 9 O w a) O V y M Co N O O CO N M CO N. 0 V li O t y L C Co CO CO CCOO CO CO CO CCOO CO CCO CO Cl) U p - , Co uN) Co Co NNn Co Co Co Co Co U Q' J H 2 CO O "' rn rn C rn m C) C) 0) 0) CD o) a Z Co u6 Co Co U) Co Co Co Co Co Co Co i W E C Z C co Co 0) N--C0 CO V co N V V CO M LC) O CO O V CO co. O N O co co co Co Co CNo O Co fN. V O ry N N M V V LO C0 CO CO N. CO w W e V V V V V V V V V V V CD H S• Z a) L GW L O Co Co co co O) 0) N` Co Co .Y o) co V N CO o N• N 0 N. CO O V CU 3 N CO O) M M CO M M CO O V O C g N CO 0 1 CO = Co CO CO ao CO CO CO CO CO ao CO NN s N CO CO N N N N N N N N N N N a CD Y Z•-• (0 CO (0 Co CO CO CO Co 0 0 V Co 0 0) O) 0 O) 0 0 CO M Cn N O 0) O) C) C) C) M CO • co• O CO in Co Co Co co CO CO N. N. CO CO (/) 0 m O O 0) C) C) 0) C) O) O) U) ..... co. CO Co Co CO Co co' Co Co Co Co O .•- I- o V V 0 CO Co CO CO 0 O V ✓ co co V V O) CO N. N• Co O Co Co M ,- - N Co V N• Co Ni O O 0) Co Co 0) 0) 0 0 O 0) .- • r .--0 '... Q Y CO 0 0 0 0 CO 0 N Co CO v N Q 0 0 0 0 C LO Co Co Co o) 0 O 0 0 0 Ci co V V V V Co rn C) rn C) co co co co co Co Co . T < a, a`) m 9 c^ E m co N L L• Cl. V V Cr) 0'C 2039 ct t6 Z d d co d 0 m 0 0 0 0 0 m o 0) 0 CA ,_ a V 0 0 V O O V O V O V N O V O O O O O m 0 V O V .c- o CV /O N 0 0 C) O O V 0 N co C`') lii) 7 co co I. N. CO (A CA 0 0 lC T N p O N N N C 0 M C V -O 2 CA l— l— .— . � I O d OI C O 1101W, 0 Oi cO CU N 0 C6 vain � 3p a W to a N Mom a• rta cr m , d cr I o Ix s g I ! : a S F ^ < e+ S La d & 3 t 2 n K &g '' 2 so A; _ N en 23, �__ s S $• m N en of a ,N'O, ^ C V.- $ , :o N m O a a-° °&� N 0 0 m F-- .� 245 ( 'i1J�8)�)`l+"'N/(NII°S N `c1 3 J m a 0 CO nn N U l'i: PA il 2 n O No 0. Y W Mvu Ut..0 on.----e.-H $y`( CV ` m m O MN32322�o�Sb 7.4z$ 23:2 >NCO 00 co c,a O°n eiv`O V -� Eg°N, gl Pi Min 2 gg OV e< I \s 8°O°°o3 8 °oO°S 0 8 000 i $ a3 C. N N o°v o°N`°m�°n en or., � Eg m a m ° m O°°O O O O 0 0 o N NN NN N N M m za c vs am$es 3aama N No6oiAov2 OoN j --n ^ A oy3 + a mn . . °vv wi 4 F v .a S $3d 6 0. 1,1 m .- o omo.. A N2<mm 2:1 e�om m��2 e a z a on CV i W v 2N2 W N CO m N lt aCN m 2 O ap n 0ap�D7 Og 0o M° A afig W s H m 00 m O m m m CO m O. CO CO m CO CO 00 CO N �m Cl VD�N�pp CO 00 V'«�$ app €'S ^gym coo cOo C I O m 0 CO^01 0 0/ O r O Of N ok O0 T op m , M ZS OtG��N op op pp m n n co A pN —CD ;O O° OOOOQ?0 V T«O p I cr WO 2o<00< yyN O N 0 pOp app O_ �N+f 00 N<Nn OoN� 00 ono co o0 00 a T 0.iA444N ui Mean Sea Level 0 ?� t�i.- nv.mm�o7rn��Nan • (m/g S£)gidaQ IeotuaA an{L BAKIiR■ BPPASSPORT h HUGHES Travelling Cylinder Report p 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well B-04-Slot 04 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB B Pad MD Reference: 7:04 7/8/1970 00:00 @ 59.60ft(generic drilling rig) Site Error: O.00ft North Reference: True Reference Well: B-04 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 4,B-04A Database: EDM.16-Anc Prod-WH24P Reference Design: Plan 4 Offset ND Reference: Offset Datum I Reference Plan 4 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 10,900.00 to 12,154.49ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,413.29ft Error Surface: Elliptical Conic Survey Tool Program Date 7/14/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 10,400.00 1 :Camera based gyro multisho(B-04) CB-GYRO-MS Camera based gyro multishot I 10,400.00 10,900.00 Plan 5(Plan 5,B-04APB1) MWD MWD-Standard 10,900.00 12,154.49 Plan 4(Plan 4,B-04A) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 12,154.49 8,985.00 2-7/8" 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB B Pad B-02-B-02-B-02 Out of range B-02-B-02A-B-02A Out of range B-04-Plan 5,B-04APB1 -Plan 5 10,900.00 10,900.00 0.00 0.29 -0.29 FAIL-Major Risk B-05-B-05-B-05 Out of range B-05-B-05A-B-05A Out of range B-05_DIMS-B-05-B-05 Out of range B-05_DIMS-B-05A-B-05A Out of range B-05_DIMS-B-05B-B-05B Out of range B-07-B-07-B-07 12,153.12 10,425.00 1,001.88 1,349.98 723.32 Pass-Major Risk B-22-B-22-B-22 Out of range B-22-B-22A-B-22A Out of range B-22-B-22A-Plan B-22A Wp03 Out of range B-23-B-23-B-23 Out of range B-23-B-23A-B-23A Out of range B-27-B-27-B-27 12,150.00 11,025.00 1,052.71 1,322.06 -259.59 FAIL-Major Risk B-27A-B-27A-B-27A 11,725.00 10,625.00 1,202.21 1,212.52 -3.34 FAIL-Major Risk B-28-B-28-B-28 11,850.00 11,175.00 1,149.96 1,318.46 -162.13 FAIL-Major Risk B-36-B-36-B-36 Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 7/14/2010 3:57:36PM Page 2 of 11 COMPASS 2003.16 Build 71 TREE- t)"COW WELLHEAD= MCEVOY ACTUATOR= OTIS B-04 SAF_ .DOTES: KB.ELEV= 59.61' BF.ELEV= 39.41' kb= 3286' [I Max Angle= 47 @ 6900' 30"CONDUCTOR --j 80' 1964' 7"SSSV OTIS LANDING NIP Datum MD= 10472 Datum TVD= 8800'SS 1 O W/INSERT,ID=3.813" 16"CSG,65#,H-40, ID=15.250" -I 2116' I E 14 2161' -113-3/8"DV PKR I 20"CSG,94#/133#,H-40/K-55, -I 2274' I--, ID=19-24"18.750"parted @2228' i2 �� 2309' I-110-3/4 DV PKR 10-3/4"CSG,55.5#, N-80, ID=9.76" -I 2389' } - 2389' H 10-3/4"x 9-518"XO,ID=8.681" I 13-3/8"CSG,51#3,68#, K55,ID=12.415" --J 4332' H-411 • 7"TBG,26#, L-80 AB-U-4S, .0383 bpf, ID=6.276" -I 6706' :I 6706' --I TOP OF 7"PBR Minimum ID = 3.725" @ 9822 I 5748' I-17"x 9-518"MC HYD HNGR 4-1/2" OTIS XN NIPPLE h ><j 7380' -I9-516°DV PKR 7380'-10784' H7"CSG CEMENT(1978 DRLG) PERFORATION SUMMARY REF LOG:BHCS/GR ON 08/11/70 ANGLE AT TOP PERF:32°@ 10530' Note: Refer to Production DB for historical perf data 1t to, SIZE SPF INTERVAL Opn/Sqz DATE 4 •, ? ? 10473- 10503 S 05/02/86 ,e 0iti: 9812' -14-1/2"OTIS WD PKR,ID=4.0" ? ? 10513- 10543 S 05/02/86 1£� 9819' -14-1/2"OTIS X NIP, ID=3.813" I ? ? 10514- 10544 S 05/02/86 OP 1 2-7/8" 6 10530-10540 0 06/02/08 9822' H 4-1/2"PXN PLUG(02/11/10) 2-9/16" 6 10536-10544 S 0721/95 ; 3-3/8" 6 10539-10544 0 03/13108 roe -14-1/2"OTIS XN NIP,ID=3.725" I 3-3/8" 6 10540-10544 S 06/15/95 :iil 111 ? ? 10551 -10565 S 05/02/86 9831' -14-1/2"BOT SO SUB,ID=4.063" 4" ? 10556-10564 S 05!02!86 1111 9832' -I ELMO TT ON XX/XX/XX? 2-7/8" 4 10557-10565 S 04/30/89 ? ? 10574-10504 S 05/02/86 li SE 4" ? 10575- 10589 S 05/02/86 4 2-7/8" 4 10576- 10566 S 04/30/89 k ? ? 10576-10590 S 05/02/86 4 3-318" 6 10580-10597 0 01127/07 3-318" 6 10597-10617 0 11/19/06 u Kif ? 4 10605- 10636 S 08/11/99 4" ? 10609-10619 S 05/02/86 4 ? ? 10610-10620 S 05/02/86 2-7/8" 4 10610-10620 S 04/30/89 "" 4" ? 10629-10634 S 05/02/86 ? ? 10630-10635 S 05/02/86 10631' -{FISH-9'SHOGUN STRIP 5 GUN SPIRAL-07/21/95 PBTD 10693' ,•:_?". T'CSG,29#, N-80,BTC ID=6.184" 10784' ''"' 9-5/8"CSG,47#, N-80,Seal-Lock,10=8.681" -I 10899' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03112/78 ROW 36 ORIGINAL COMPLETION 03/20/08 LJH/TLH ADPERFS(03/13/08) WELL: B-04 08/07/03 KC/TLP ADD MISSING CSG STRINGS 0625/08 TA/PJC PERFORATIONS(06/02/08) PERMIT No:'1700320 05/15/04 JLJ/KAK CORRECTIONS 02/01/10 RPC/PJC MIN ID CORRECTION API No: 50-029-20072-00 0722/06 JGM/PJC CEMENT SQZ 02/01/10 JLW/PJC CORRECTIONS SEC 31,T11 N,R14E,741'FNL&1599'FEL 11/19/06 TEL/PAG ADPERF 03/01/10 SEW/SV SET TTP(02/11/10) 01/28/07 JMF/TLH ADPERF&CORRECTION(1978) 05/03/10 MSE CORRECTIONS BP Exploration(Alaska) TREE- 8-OW N1VELLHEA0= MCEVOY B-04A SAF. JOTES: ACTUATOR= OTIS KB.ELEV= 39.41' BE ELEV= 39.41' Proposed CTD Sidctrark post RWO KOP= 3286 1 Max Angle= 47 CO 6900' 30"CONDUCTOR 80' Datum MD= 10472 -1900' _4-1/2"SSSV LANDING NIP Datum TVD= 8800'SS 16"CSG,65#,H-40,ID=15.250" -1 2116' F--- ∎ L 2161' H13-3/8"DV PKR 20"CSG,94#/133#,H-40/K-55, -I 2274' ID=19-24" 18.750" 0 2309' -10-3/4 DV PKR I 10-3/4"CSG,55.5#, N-80, ID=9.76" -I 2389' 1- - 2389' 10-3/4"x 9-5/8"XO, ID=8.681" ■ 13-3/8"CSG,61#&68#,K55,ID=12.415" -I 4332' 1-- 4111 6706' -HOP OF 7"PBR 6748' -17"x 9-5/8"MC HY D HNGR ∎i F�4 7380' -19-5/8"DV PKR I 7380'-10784' —1 7"CSG CEMENT(1978 DRLG) Minimum ID = 2.3" ; ii: TOL 3-1/2 • t 1 , 2 I -9730 H4-1/2"x 7"PRODUCTION PKR gi Li TSGR 9,968' 36° :• BCGL 10,391' I •9900 HTOL 3-1/2' ID=2 30" I 4-1/2 13Cr TBG,XX#, XXX bpf, ID=XXX" 10000' I 10410' 1-14-1/7'x 7"TT UVhipstock PERFORATION SUMMARY TOC —10200' REF LOG: BHCS/GR ON 08/11/70 . �-i3-1/2"x 3-1/15'X-over I ANGLE AT TOP PERF 32° 10530' I);; 10300' Note: Refer to Production DB for historical perf data 31 3? 11500' -13-111T x 2-718"X-over l SIZE SPF INTERVAL Opn/Sgz DATE ? ? 10473-10503 S 05/02/86 .� _�:ii ? ? 10513- 10544 S 05/02/86 i 10435' 7'GBP 3-3/8" 6 10530-10544 0 03/13/08 ? ? 10551 -10590 S 05/02/86 3-1/2'X3-3/16"x2-718"L-80 liner -I 12150' 3-3/8" 6 10580-10597 0 01/27/07 �., 3-3/8" 6 10597-10617 0 11/19/06 ?? -14-1/2"OTIS WD PKR,pushed to bottom ? 4 10605- 10636 S 08/11/99 Lir'1) 8 10631 FISH-9'SHOGUN STRIP GUNS PIRA L-07/21/95 4. PBTD 10693' :. 7"CSG,29#, N-80, :37C ID=6.184" 10784' f; ,Y'NAM.' rr 9-5/8"CSG,47#, N-80, :',>:1-.' cc, ID=8.681" -1 10899' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/12/78 ROW 36 ORIGINAL COMPLETION 03/20/08 LJH/TLH ADPERFS(03/13/08) WELL B-04 08/07/03 KCITLP ADD MSSING CSG STRINGS 06/25/08 TA/PJC PERFORATIONS(06/02/08) PERMIT No: 05/15/04 JLJ/KAK CORRECTIONS 02/01/10 RPCJPJC MN ID CORRECTION AR No 50-029-20072-0 07/22/06 JGMVPJC CEMENT SQZ 02/01/10 JLW/PJC CORRECTIONS SEC 31,T11 N, R14E,741'FNL&1599'FEL 11/19/06 TEL/PAG ADPERF 03/01/10 SEW/SV SET TTP(02/11/10) 01/28/07 JMF/TLH ADPERF&CORRECTION(1978) 06/22/10 MSE PROPOSED CTD SIDETRACK BP Exploration(Alas ka) All Measurements are from top of Riser 7/16/2010 i (1) CO CC B-04A top of bag C 4 BAG 7 1/16" 5000 psi. bttm of bag I J middle of slips I Blind/Shears .. I I TOTs middle of pipes 2-3/8" combi ram/slips 7 1/16" 5000psi 1 �+ Mud Cross Mud Cross middle of flow cross 7 1/16" 5000psi middle of blind/shears variable bore pipe 3 1/2"-2 3/8" I I TOTs middle of pipe/slips I 2-3/8" combi ram/slips 7 1/16" 5000psi I I Swab Valve, I I Flow Tee Alaska Department of Natural P.-sources Land Administration System Page 1 of/i Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28310 a Printable Case File Summary See Township,Range, Section and Acreage? New Search 0 Yes 0 No LAS Menu I Case Abstract I Case Detail I Land Abstract • File: ADL 28310 MaP Search for Status Plat Updates As of 07/26/2010 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2491.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: O11N Range: 014E Section: 29 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 014E Section: 30 Section Acres: 604 Meridian: U Township: O11N Range: 014E Section: 31 Section Acres: 607 Meridian: U Township: O11N Range: 014E Section: 32 Section Acres: 640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-131 11N 14E UM 29,30,31,32 2491.00 U-3- 7 End of Case Summary Last updated on 07/26/2010. http://dnr.alaska.gov/projects/las/Case_Summary.cfim?FileType=ADL&FileNumber=2831... 7/26/2010 TRANSMITTAL LETTER CHECKLIST WELL NAME 4 ,L-044 PTD# V Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: ,e!/,Q,-/OE'2 7Y POOL: '.�1/D�GL' ,QY Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - . API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 E To N 0) 0 0 C- O N 0 a O (6 T.) C (n C > O 6 a) 0 O O > ai -7 w o E O L O) a E O 0 N CO N 'xi 2 O .c O N a m ° .0 3 3 N 7 = CJ _ a) 0 -o o a) in N 0 a`�) a CO a D > C •N 0 9 L a • C CT _ c j Q. c > Q N Z a >0U -° m ry(t O a N co • CO d a E 0 F- - 3 7 o v c6 p z 0 0 N N 'p C C 3 N y0' O C E Q a. 2 Q . O `° C 5 CO o CO a.„9 O N O m fh m. 0 V N 0 M W _ _ O U) O N m C a s O C�6 IN _0 N "O TD O• CO V �O m N N N c . 0 N N L CO O. aO (A oo E N t N a m N m U 0 o) 0 "O C CO a) N C d 2 C N U C 0 0 'y U `a .a. p `) 'gyp N C N C a To a C -O (n \.. 4) a0 C N N N U @ O N C C O co co = E O O CO CO C -p a s (6 - (O _ co C7 co O U U O 0 N a T D E N co co - (O 0 - Y -0 CO CO 7 N 0 O cr N L d 0 N O 0 co C 't 't �2 E a O O 2 0 co < N CO O 7 7 0 � > • W CO O (n co Cl_ O — C M a > 2 2 I 2 a > w < a) a) a) CO) a) a) a) a) aN) a) a) a) < < < < < < < < a) CO) aa)) CO) a) < a) a) aa)) a) a) a) < 0 < < < < `\� Q z >- >- >- >- >- r )- >- >- >- >- >- zzz z zzzz >- >- >- >- >- z >- >- >- >- >- >- z z z z z z T F O a)- i N T a co co U (-T) o c o 0 a) E 3 - E as O U U 'E C O N N C * O O O .0"co- _ 0 S-", 7 a T 7 C L O a E in *k 0 0 c 0 o 3 E 3 o co O O M N a) a U C C' O J CO 'Z w a N Ow a) 0 `o aa) N 0 _ 0-2 m 0 LL 0 m 0 1 v•O 0 > C Cl J 't a 7 w = 7 O T c 7 O N co a) C -O N N CO N. O d L N O Q N U O ics 'OO CW 0 N N p CO w C C N O (0 .. a) w 7 .7 t C E L0 N N a T N E 0 N ..� d m a :'='- o > '@ .64 • o o N a N o a) c o = n 2 3 a' N "� QU C a`) 7 a) (O f�0 T .L... '- N Cf• 0 "O O 0 .5 E ate) (O .5 CL 0 co a O 7 4) N I' co ._ L p) U Z fn 0 7 3 O co C (T L C N 7 CT L 7 Q N N 0 w - a 0 C o o a) .E m > a • D ° ` m °0 0 a) N a N C C 2 C o o O Q E E _ c c E o co c c w '� c o o6 C C 0 "L" cm a N N a m o\`" I Y O O "O 7 O 0 C co O O) 7 U 'a �' 0 U 0 Qj d O y •3 p > N >. �c+ D Q .0 0 0 a) c c T o > > o a m .@ o . @ o 0 0 0 as o m '@ Q m u) T o rn o m .w ce J E a 0 0 0 .n o 0 0 c a) - a Z o E 7 3 0 2 a) .c m 3 _ 0 E a Q @ 7 p (CO 0 (6 0 t .0 L CO 0 E m `° L • c a) 0 co 2 'N- L o N o a 3 0 •'' o 3 c E o z c p N N a a@ '3 a°i a a) .. o p w o a 0 N a a) cn 0 3 a) co 6) o w U O O O C CC "O 'O > 0 8. 'O 'O O as 'E O c O N O O C CT 'O 0 N N N a 0 CA C 'O a N j 0 a (6 0 (6 p m 0 ,� 0 o E O E L o 0 N c H 0 a -p N N J2 U 7 7 a c V U OU 0_ 0 0 a) _ "O 0 2 -t'.7 2 E CT O (n 7 c O o CAS Q L N 0 CO O O m N a N N a L e- 0 N m a Z. co CO CO (T N p 0 `p) C U 3 N :0 N N 'O 2 U E (O 3 (O .-0-C @ C O) 7 7 N co 1] O@ "O j c C� "06 .N O Q O O y6 0 c C a a 0 N T N L 1) L 3 L_ C 0 0 > c co N CT o_ -c N o U O OU 0 ° T i5 0 0 U n. 0 E .) 0 0 0 ° -a O L C C .. 0 U C N N - a O 'N co - 3 a) -p 0 N C 0 0 (O C 0 c C E a---, W a) 7 3 (O l9 f0 C U CO E N 3 j O 0 lO (O O .D 0 = a) N .2 -0 N @ - C .0 CO N (O 00 c C 0 U U 0 N O O 0 U N O C U 0 O O N 'p (6 r ul °. E a) C «U, U 'O m .E N O O O O .0 .� N a) •C •C a -p 3• d ° 6 0 1— f- p' p' > 0) a a Y Y a) co 'E m N , ai 0 0 C c 3 c c t N a) a) '- O m e is a) a 'c .) 7 0 a a `m a) CO °) - 0 0 7 2 2 2 m a 0 -p = O O L O °- 0 a) m a) a) o p • a J p cn � O O a a U Q d z 0 (00000 < .= < .. o m m 0 g d 0 (n cn U Ui I a O E N M V CO (O N. CO 0) O a- N (.1 V Cf) Cr) N. 0�0 O� N O N.- N M N V N n (N fl N r N (N o M M M M 2 M M r M M . t U I CO O O 1 (O r Q o °) N d Cr-,-;..: 0(u 5).(7)C O C CO O 0 CO O N 0w 0# E N- N 0 OT) C:J o E o till I-a▪ Q a Q w < O C7 Q Q 0 m N m o a) 0- N N_ a) 0 o (0 — - N C C 0 a) 0 > L W U) c O c E O @ `o) 0 a_ o ' I M 1 3 f a r a Q o m v O I 0 CD V a al CC W co m CC d co C ° 4t cn o 0 O = co 0 m N Z N a) a C X Z @ @ w m 2 o_ W 0 0. 0- a a 4 0. a a 0 a a a a a a a a N N N N N N N N N N N N E E E E E E E E E E E E E E E E E < O as 0 o O O O O o 0 0 o < < < < 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O < < < < a Z >- >- >- >- r >- >- >- >- >- >- } Z Z Z Z c c c c 'c c c c c c c c c c c c c Z Z Z Z Z IT `o N N T @ C O o n O @ To a) a 1 0 E 3 o c a) I 4$ N O_ 0 0 LL T O j T � C ° N �' c ..c ° Ta .N ° o a) a E co u E ° o co� O a) M lid C U_ O 0• J C co _0 a) Z @ O Y Q o E N O WO "@O (0 .0 N N N co 0 Q a) O O N a 0 _92 U LL N X a) I c 0 - LL N N 3 C 7 T C L� D) 6 "O N N 0 'a o a �, O Q N U 2 "06 O W w co o O CO'O f N 'N ._ C O a Q (� 07 a) 0 a) @ T - "0 O 0 a @ a a) _@ '3. 0 M �' 7 N N m = L O U Z N @ 7 3 O (/) C 0) C C N 3 O" 7 < N N a) N 0) w - o o c o N c @ .� 0 o co a 0 n a N C C °) Co 0 0 Lo O E E = a c c E E o c c in L- c ° as c o w a) E- N r n = Q O O 'O 0 'O O @ _ Q 30 O ° (3 `• @ a U 0 O p N N T N Y _ _ _ c rn n - o _ a 3 D < a ° o a) c c c ° N 0 0 o Y o o a) @ o m@ m Q c� 0 m o �'o E °a o 0 a) ' r _° oo o a) a m o m a ° Z o E 0 3 0 2 a) _c m 3 " 0'N d Q @ c -0 0 000 a, n co a a) s s --o @ 0 E N @ ° c c a? to co m 'N r 0 o aNi oa a 3 ° c ° >, c v) Z Z a) N N - m 3 3 0 �_ .. o °- w ° 30 ° ° °) w a _ m 3 L 0 0 E En 0 O .O "c c • .@ ° N 'Q "O "O O CO 0 c O N 0 O c Q N "00 a) N E O co c 'O Q N 3 a -0 @ .a @ 0 O o 0 E Y a) 0 0 E a) E r o a) c w o 15 023 - 0 a a) -° 0 a) o d N CO a a C V N OU a ° a) a) - N N N -6 @ E c) O N • C O N O 0 Q t @ @ O O m a t� N r N CCD 0- @ @ N O) @ O N O) >, '- 3 2 -° N ° N O fl. a) O .@. N C C a s co @ a) o a) 3 C '0 0) C c) O- 0- a) C C @ 7 d =o-� N Q 7 o 0 6 T µ a) LL - @ O N N o @ C @ -0 -0 0 •10 a) N 0.° "@O "@O > 0) @ L a) a "O 0 N C U Q) ° 4 -co @ -c E x w °' 0 0 a°) o c c c E 3 0 ° o 0 @ @ ° 0 13 a) - a) 5 -0 E @ ° c `o m N 0 ° c w c 3 c� U U @ o `o c� c� ° o c ° a.) o o @ -o @ r a E T. a) 'c U a) v -o fn a �' a), o) o 0 O ., .> @ io a 0 a) a o '0 0 > > 3 m o T o 0 co c) w w ,0 Y co co .. a E o 0 Y m 0 a°0 C a) o a) = 0 0- 0- a`) a`) CD a) 3 m o o c 2 2 .e ca -o0 @ -°)0 0 0 O _c 0 - a°) u co -a a) o ai V c 0_ _I D � cn w 0 O a a o � a a z 0 u) o 0 � v ¢ w a w o m m v 2 a o cn co 0 o co W a O N M V to (0 r W 0) O N cc's,' V to O r CO O O N M V O h CO O I o - N co V in c0 I-- CO C) N N N N N N N N N C) M M C:) C') C') M M M M U O _ O_ a) O a) 0 0 N 2 O N N CO Et co 0 0 O G O U ° J w a) T 0E N •c a 0 a 0 G C7 E > F- -0 0- Q w a a a • Well History File APPENBIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. tapescan.txt **** REEL HEADER **** MWD 11/01/12 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 09/11/13 2862351 01 2.375" CTK *** LIS COMMENT RECORD *** 111111III ! IIIIIMMII Remark File Version 1.000 iiiiii ! IIIIIIFiiii1 Extract File: ldwg.las -Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame -well Information Block #MNEM.UNIT Data Type Information STRT.FT 10367.0000: Starting Depth STOP.FT 12020. 5000: Ending Depth STEP.FT 0. 5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska) , Inc. WELL. WELL: E-09CPB1 FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 20' 34.706"N 148 deg 39' 55.005"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: 13 Nov 2009 API . API NUMBER: 500292046671 -Parameter Information Block #MNEM.UNIT Value Description SECT. 06 Section TOWN.N T11N Township RANG. R14E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF . DF Log Measured from FAPD.F 65.01 Feet Above Perm. Datum DMF . DF Drilling Measured From EKB .F 0 Elevation of Kelly Bushing EDF .F 65.01 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 goo) - 0078 9o-9-06 tapescan.txt CASE.F N/A Casing Depth 051 . DIRECTIONAL Other Services Line 1 -Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are SubSea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well . . (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole weight on Bit) , a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a Primary Depth Control (PDC) log from well E-09C above the Kick off Point of 11090 ft. MD dated 18 Nov 2009 per Doug Stoner with BP Exploration (Alaska) , Inc. (8) The sidetrack was drilled from E-09 through a milled window in a 3 3/16 inch liner. Top of window 10613 ft.MD (8635.2 ft.TVDSS) Bottom of window 10619 ft.MD (8639.7 ft.TVDSS) (9) Tied to E-09 at 10612 feet MD (8494.0 feet TVDSS) . (10) The interval from 11988 ft to 12020 ft MD (8883.0 ft. to 8886.9 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kHz-Compensated Borehole Corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHz-Compensated Borehole Corrected (OHMM) RPCLX -> Resistivity (PD)(LS)400kHz-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHz-Compensated Borehole Corrected (OHMM) TVDSS -> True vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 10373.1, 10377.8, ! 4.72168 10375.7, 10380.5, ! 4.7207 10380.3, 10384.4, ! 4.10449 10386.2, 10390.5, ! 4.31055 10397.1, 10402.4, ! 5.33691 10404.1, 10408.6, ! 4.51562 10407.6, 10412.5, ! 4.92578 10412.5, 10417.2, ! 4.7207 10415.4, 10420.3, ! 4.92676 10424.2, 10428.1, ! 3.90039 10426.6, 10430.5, ! 3.90039 10430.3, 10434.4, ! 4.10449 10433.9, 10438, ! 4.10547 10611.5, 10611.1, ! -0.411133 10615, 10615.4, ! 0.410156 10619.3, 10619.9, ! 0.615234 10621.8, 10621.5, ! -0.205078 10625, 10625, ! 0 10632, 10631.8, ! -0.205078 10639.4, 10638.2, ! -1.23145 10642.1, 10641.5, ! -0.616211 10643.7, 10643.1, ! -0.615234 10647, 10646.4, ! -0.616211 10654.4, 10653.8, ! -0.615234 10664.2, 10661.8, ! -2.46289 Page 2 tapescan.txt 10668.1, 10665.4, ! -2.66797 10674.1, 10672.8, ! -1.23145 10675.9, 10675.7, ! -0.205078 10681.7, 10680.8, ! -0.820312 i 10686.8, 10686, -0.821289 10694.6, 10695, ! 0.410156 10700.5, 10700.1, ! -0.411133 10703, 10702.8, ! -0.205078 10706.5, 10706.7, ! 0.205078 10709.5, 10709.1, ! -0.411133 10712, 10711.5, ! -0.410156 10714, 10713.4, ! -0.616211 10718.1, 10717.5, ! -0.615234 10719.1, 10719.3, ! 0.205078 10722.1, 10721.6, ! -0.411133 10724.3, 10724.1, ! -0.206055 10726, 10726.4, ! 0.410156 10729, 10730. 5, ! 1.43652 10734.6, 10735.2, ! 0.615234 10739.1, 10739.5, ! 0.411133 10746.9, 10746.5, ! -0.410156 10751.2, 10750.8, ! -0.410156 10755.3, 10755.1, ! -0.206055 10758, 10756.9, ! -1.02637 10762.1, 10761, ! -1.02637 10767.4, 10766.2, ! -1.23145 10769.3, 10768.6, ! -0.616211 10772.1, 10771.7, ! -0.410156 10775.8, 10775.6, ! -0.206055 10779.3, 10779.9, ! 0.615234 10783.4, 10783.6, ! 0.205078 10789.5, 10789.1, ! -0.411133 10791.1, 10791.3, ! 0.205078 10795.7, 10795.4, ! -0.205078 10802, 10802, ! 0 10807.1, 10806.7, ! -0.410156 10813.1, 10812.5, ! -0.615234 10822.4, 10822.6, ! 0.205078 10833.2, 10834.1, ! 0.821289 10838, 10838.8, ! 0.821289 10845.2, 10844.9, ! -0.205078 10852.7, 10850.5, ! -2.25781 10855.7, 10853.2, ! -2.46289 10858.9, 10856.4, ! -2.46289 10860, 10859.2, ! -0.821289 10867.6, 10867.2, ! -0.410156 10873. 5, 10873.3, ! -0.206055 10875.4, 10875.4, ! 0 10878.9, 10879.1, ! 0.205078 10881. 5, 10880.9, ! -0.616211 10883.4, 10884, ! 0.616211 10888.1, 10888.1, ! 0 10891.7, 10891.5, ! -0.205078 10895.2, 10894.6, ! -0.615234 10897.6, 10896.9, ! -0.616211 10901. 5, 10901.3, ! -0.205078 10903.9, 10903.5, ! -0.410156 10906.6, 10907.2, ! 0.615234 10909.4, 10909.6, ! 0.205078 10915.6, 10914.4, ! -1.23145 10920.9, 10918.9, ! -2.05273 10923.6, 10922.8, ! -0.820312 10927.7, 10926.3, ! -1.43652 Page 3 tapescan.txt 10934. 5, 10933, ! -1.43652 10937.6, 10937.4, ! -0.206055 10942.3, 10942.5, ! 0.205078 10944.7, 10944.9, ! 0.205078 10947.2, 10947.4, ! 0.205078 10959.3, 10957.7, ! -1.64258 10961.8, 10959.8, ! -2.05273 10981, 10978.7, ! -2.25781 10988.5, 10986.8, ! -1.64258 10998.8, 10998.2, ! -0.616211 11004.8, 11005.9, ! 1.02539 11010.6, 11011.7, ! 1.02637 11014.5, 11015.9, ! 1.43652 11018, 11020.3, ! 2.25781 11022.9, 11024, ! 1.02637 11034, 11032.4, ! -1.64258 11037.1, 11036.5, ! -0.615234 11041.8, 11041.4, ! -0.411133 11046.7, 11046.7, ! 0 11054.7, 11056.4, ! 1.6416 11063.4, 11062.4, ! -1.02637 11068, 11065.8, ! -2.25781 11077.9, 11075.8, ! -2.05176 11082, 11079.1, ! -2.87305 11085.2, 11082.1, ! -3.07812 11087.6, 11084.7, ! -2.87305 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 188 records. . . Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** IIIIII ! II ! IIIIIIII ! Remark File Version 1.000 The data presented here is final and has been depth adjusted to a Primary Depth Control (PDC) log from well E-09C dated 18 Nov 2009 above the Kick Off Poi of 11090 feet MD. per Doug Stoner with BP Exploration (Alaska) , Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Page 4 1 tapescan.txt Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 92 Tape File Start Depth = 10367.000000 Tape File End Depth = 12017.500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 105 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** LIS COMMENT RECORD *** 1111111111111111111 Remark File Version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Page 5 tapescan.txt Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code samples units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 93 Tape File Start Depth = 10362.500000 Tape File End Depth = 12020.500000 Tape File Level Spacing = 0.500000 Tape File Depth units = feet **** FILE TRAILER **** Tape subfile: 3 106 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 09/11/13 2862351 01 **** REEL TRAILER **** MWD 11/01/12 BHI 01 Page 6 tapescan.txt Tape Subfile: 4 2 records. . . Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 10367.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10367.5000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 12017. 5000 -999.2500 70.4799 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 10367.000000 Tape File End Depth = 12017.500000 Tape File Level Spacing = 0.500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 10362.5000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10363.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 12020.5000 -999.2500 70.5000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 10362.500000 Tape File End Depth = 12020. 500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet 0 Tape Subfile 4 is type: LIS Page 7