Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
210-105
David Douglas Hilcorp North Slope Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt and return one copy of this transmittal. Received By: Date: Hilcorp North Slope, LLC Date: 06/26/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL Folder Contents: Log Print Files, Reports and Digital Data Files: Well API #PTD #Log Company Log Date Log Type AOGCC E-Set # PBU W-219 50029234290000 210105 SCHLUMBERGER 04/05/2015 MEMORY LEAK DETECT LOG Please include current contact information if different from above. T25785 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.06.26 09:28:42 -08'00' New Plugback Esets 6/26/2024 Well Name API Number PTD Number ESet Number Date 2L-320 PB1 50-103-20627-70-00 210-166 T39025 3-8-2011 2L-320 PB2 50-103-20627-71-00 210-166 T39026 3-8-2011 CD4-23 PB1 50-103-20621-70-00 210-067 T39027 8-30-2010 CD4-23 PB2 50-103-20621-71-00 210-067 T39028 8-30-2010 ODSK-13 PB1 50-703-20607-70-00 209-146 T39029 11-18-2011 ODSK-13 PB2 50-703-20607-71-00 209-146 T39030 11-18-2011 ODSK-14 PB1 50-703-20610-70-00 209-155 T39031 3-24-2010 ODSK-14 PB2 50-703-20610-71-00 209-155 T39032 3-24-2010 OP05-06 PB1 50-029-23427-70-00 210-080 T39033 10-28-2010 OP05-06 PB2 50-029-23427-71-00 210-080 T39034 10-28-2010 P2-22A PB1 50-029-22850-71-00 209-161 T39035 6-4-2010 P2-22A PB2 50-029-22850-72-00 209-161 T39036 6-4-2010 S-129 PB1 50-029-23433-70-00 210-132 T39037 5-12-2011 S-129 PB2 50-029-23433-71-00 210-132 T39038 5-12-2011 W-219 PB1 50-029-23429-70-00 210-105 T39039 1-27-2011 W-219 PB2 50-029-23429-71-00 210-105 T39040 1-27-2011 W-220 PB1 50-029-23432-70-00 210-126 T39041 3-27-2013 W-220 PB2 50-029-23432-71-00 210-126 T39042 3-27-2013 W-WW 219 PB1 50-029-23429-70-00 210-105 T39039 1-27-2011 W-WW 219 PB2 50-029-23429-71-00 210-105 T39040 1-27-2011 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Wednesday, December 6, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Adam Earl P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC W-219 PRUDHOE BAY UN POL W-219 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 12/06/2023 W-219 50-029-23429-00-00 210-105-0 W SPT 5010 2101050 1500 1057 1057 1057 1057 242 401 394 389 4YRTST P Adam Earl 10/22/2023 4-year MIT_IA 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UN POL W-219 Inspection Date: Tubing OA Packer Depth 550 1994 1947 1940IA 45 Min 60 Min Rel Insp Num: Insp Num:mitAGE231025110010 BBL Pumped:1.5 BBL Returned:1.2 Wednesday, December 6, 2023 Page 1 of 1 Nolan Vlahovich Hilcorp Alaska, LLC Geo Tech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 06/13/2023 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20230417 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# MPU B-21 50029215350000 186023 5/8/2023 HALLIBURTON Jewelry Log MPU B-21 50029215350000 186023 5/12/2023 HALLIBURTON Leak Detection Log MPU B-21 50029215350000 186023 5/13/2023 HALLIBURTON Multi Finger Caliper Report MPU I-04A 50029220680100 201092 4/17/2023 HALLIBURTON Cement Bond Log NS-16A 50029230960100 206141 4/3/2023 HALLIBURTON RBT NS-23 50029231460000 203050 4/25/2023 HALLIBURTON RBT PBU 09-24A 50029214280100 223003 4/9/2023 HALLIBURTON RBT-Coilflag PBU C-26A 50029208340100 198145 3/17/2023 HALLIBURTON Production Profile PBU M-201 50029237110000 222030 5/29/2023 HALLIBURTON Inj. Profile PBU S-32A 50029220990100 212082 5/23/2023 HALLIBURTON CAST CBL PBU S-37A 50029222910100 212092 5/19/2023 HALLIBURTON RBT PBU V-221 50029232460000 205013 5/14/2023 HALLIBURTON Inj. Profile PBU W-04 50029219070000 189008 3/8/2023 HALLIBURTON CAST CBL PBU W-209 50029231700000 203128 5/13/2023 HALLIBURTON Inj. Profile PBU W-219 50029234290000 210105 4/16/2023 HALLIBURTON Inj. Profile PBU Z-223 50029237200000 222080 2/28/2023 HALLIBURTON Inj. Profile SRU 213B-15 50133206540000 215130 4/28/2023 HALLIBURTON Perf Please include current contact information if different from above. T37729 T37729 T37729 T37730 T37731 T37732 T37733 T37734 T37735 T37736 T37737 T37738 T37739 T37740 T37741 T37742T37743 PBU W-219 50029234290000 210105 4/16/2023 HALLIBURTON Inj. Profile Kayla Junke Digitally signed by Kayla Junke Date: 2023.06.13 13:09:15 -08'00' MEMORANDUM State of Alaska Permit Number: 210-105-0 Alaska Oil and Gas Conservation Commission TO: Jim Regg J DATE: Friday, November 8, 2019 P.I. Supervisor l � � l b� l �C 1 SUBJECT: Mechanical Integrity Tests Packer Depth Pretest Initial BP Exploration (Alaska) Inc. Well W-219 FROM: Brian Bixby PRUDHOE BAY ON POL W-219 Petroleum Inspector 5010 - Tubing Src: Inspector 1270 - Reviewed By: 1213 - P.I. Supry V%fL NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UN POL W-219 API Well Number 50-029-23429-00-00 Inspector Name: Brian Bixby Permit Number: 210-105-0 Inspection Date: 10/20/2019 ` Insp Num: mitBDB191021084346 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well W-219 Type Inj W 'TVD 5010 - Tubing 1268 1270 - 1249 1213 - — PTD 2101050 Type Test sPT Test psi 1500 - IA 20 2499 2423 - 2394 BBL Pumped: 2.8—' jBBL Returned: 2 OA 216 321 - 326 - 322 Interval _ avRTsr—I p/F P Notes: Friday, November 8, 2019 Page 1 of 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg(�� �G[j P.I. Supervisor T (11 G jly DATE: Tuesday, October 22, 2019 SUBJECT: Mechanical Integrity Tests BP Exploration (Alaska) Inc. Rel Insp Num: W-219 FROM: Brian Bixby PRUDHOE BAY ON POL W-219 Petroleum Inspector 15 Min 30 Min 45 Min 60 Min Well Src: Inspector Reviewed By: W -TVD P.I. Supry S— 5010 - NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UN POL W-219 API Well Number 50-029-23429-00-00 Inspector Name: Brian Bixby Permit Number: 210-105-0 Inspection Date: 10/21/2019 ' IRSp Num: mi[BDB191021084346 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well W-219 Type Inj W -TVD 5010 - Tubing 1268 - 1270 - 1249 - 1213' PTD zloloso Type Test SPT Test psi 500 - IA zo 2099 2023 2390 BBL Pumped: z.8 BBL Returned: z OA 216 - 321 - 326 322 - Interval 4YRTST P/F P Notes: nipdere Auyc54zvcgs Shu to Ca - GeZ-t U-1AC lvt.,ak Tuesday, October 22, 2019 Page 1 of 1 Wallace, Chris D (CED) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Sunday, September 1, 2019 8:08 AM To: Wallace, Chris D (CED) Cc: AK, GWO Projects Well Integrity; AK, GWO Well Integrity Well Information Subject: GC2 Injectors overdue for AOGCC MIT -IA Mr. Wallace, Injectors W-207 (PTD # 2030490), W-221 (PTD #2110290), W-220 (PTD #210260), W-223 (PTD #211060), R-06 (PTD #1981270), and W-219 (PTD #2101050) were due for 4 year AOGCC MIT-IAs at the end of August 2019. Due to the GC2 TAR the wells have been shut in and were not tested before the end of the month. GC2 is expected to be back up to full rate by the end of next week so BP is requesting to leave the above mentioned wells in Operable status and track them on the monthly compliance report until they are brought back online and pressure tested. Please advise if this is not acceptable, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday,September 10,2015 TO: Jim Regg (Ref/ 912- .i 15 P.I.Supervisor SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC W-219 FROM: Jeff Jones PRUDHOE BAY UN POL W-219 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry der-- NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UN POL W-219 API Well Number 50-029-23429-00-00 Inspector Name: Jeff Jones Permit Number: 210-105-0 Inspection Date: 8/16/2015 Insp Num: mitJJ150906071750 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well T e In TVD -- 2101050 , Yp SPT p 5010 gT 1676 1680 . 1678 1679. -- Tubin � PTD iT a Test Test si I --- ; 1145 w-z19 Yp J �' i •� 1500 - IA 1145 2514 . 2475 -I 2468 - Interval 4YRTST PVF P '_OA 404 •! 487 490 . 490 - Notes: 0.9 BBLS methanol pumped. 1 well inspected,no exceptions noted. - SCANNE . Thursday,September 10,2015 Page 1 of 1 . In cm in oo O w O� o w vv' m n m K "•-• ', .l. •14. -0� friN 2 0 o r a s v E v o v rid • s s c d " v 0 L a 0 .d c- �° o ~ o U _ u > E C o CV cul, c O _ dd Q O 'p O V' -b @ c >.. O" Q 0 co y- v o @ Lr) c r o aa � aaa aaf6 0_ `" s c c < < < < < < 2 .� a v 7 N cD a tV h c a > N N N N N cQ) Q N u• E o T U Y N > _ N O ) ''' co D 0 0 0 0 0 0 0 0 0 0 0 o v u a J J J J J J J J J J J W W W W W W W W W W W c O co O O •-• LL LL LL LL u. u. LL LL u.. LL u. 41 E 'O N O J J J J J J J J J J J Q O C v < < < < < < < < < < <Q Q - vi 0 � Z Z Z Z Z Z Z Z Z Z Z ad 1130 ad v, u O 0) LL LL LL LL- LL LL LL LL LL LL LL N L u - O - C `.- E O i�) Z fin 'u > it -071 V. `Z O J 0 2 F H J 4' m o n LL Go a a o a EL EL us v; ww U '' > x ,Z MI CL S4' 6 ''') .� J. W .7 l7 'J 0 ii a c0 AM CZ Ce W Ce i CO g % -I -1003 -J00ZZz ZW W W W J J J rA...to w , r r cc >- >- r >- >- >. OD mmmmmmmmm I- to a, WWWWWWWWW -01 E 0 0 0 0 0 0 < 0 0 0 0 3 2 2 x 2 2 2 J 2 2 z x — O 0 0 0 0 0 0 0 0 0a) > > > Z > > a > > 0 0 rn a a a 0 a a as a as a @ ° 0. T °0 a x in p TO) N 0 0.) O c0 O nu (V N C) N M M p N 0 - 0 OO O O O 0 O 0 N N cc O O O 0 O 0 p 0 0 O O - 0 0 0 0 0 0 p 0 0 0 0 rp Q .,..6 LL C1 v 2 U 0 E a Ce < rn o) -, co °O -) a) C M V LO c0 O) > Q N N O 0 0 0 0 0 0 0 0 0 0 0 CD X r(o p O O M O O O O N r!') 0 O 0 O O O O O O O 0 O O N 4 4 r) n v) v) o) c) v v m c MM M CO CO CO CO 'C CO V V C') � ^ 0 0 0 N M 0 0 .-• nN N N N N N N N N N N N t- :_, O) C) O) O) O) O) O) O) O) G) O)11111111111 0 N N N N N N N N N N N Ql 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O in in in lA )() )() )[') IS) V) It) )() O 1..� 4) CO C fl u C : 'k-'cc S E u > u L g ce W c Q� i �+ 00 4) M N r. M = H = a Q eN A• A7 (1 N000 Z a) ro ea .•--i ^ ca • a• mi o Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. cQ1 Q - J 0 5 Well History File Identifier Organizing(done) Two-sided III IIIIIfl II III ❑ Rescan Needed III I11111 1111 III RESCAN DIGITAL DATA OVERSIZED (Scannable) //Color Items: ❑ Diskettes, No. ❑ Maps: gGreyscale Items: ❑ Other, No/Type: ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Maria Date: /s/ ru i ip,a/51/ Project Proofing I 111111101M BY: aria. Date: ais-y/q. Is! 111P Scanning Preparation L± x 30 = I a 0 + 1 4 = TOTAL PAGES I 36 (Count does not include cover sheet) p BY: Maria Date: a S /Li. /s/ Production Scanning 111111111111111 Stage 1 Page Count from Scanned File: 137' (Count does include cover heet) Page Count Matches Number in Scanning Preparation: YES NO BY: Date: s'/L f. /s/ VVJP I Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. 1111111111 IIII ReScanned II "MIN 11111 BY: Maria Date: /s/ Comments about this file: Quality Checked I 90N)ONNH I 1A/..II LJ■,+,...,CU..!`...,...M.,.....1.... o il'I c 1 Z ❑ co o �t m 0 J H H v 3'0) 0 ° Q N co [L d J c J Q ct r�i ❑ U U U CD •c Q w N - �' �' N(O y �' Lu N C U U (7 m co o w w C7 ❑ C7 ❑co E J J = - - aNW u, ❑ ❑ Z co k U U U ❑ >° ❑ 01- t) 1 o > > > .-E 00 0 ❑ 1- 2 �U Z 0 o U cn U U a) m m ='0 E ❑ >>>Z m m m H m_1 F. co c > > -D > a d 0 ma. on ~U a a. aU dQ Q 76 o v 0 0 0 0 0 a a) 0 0 0 o 0 0 0 0 0 0 0 0 0 Z o 1 co O N N N N N N N N N N N N N Z ° J N r r r r ,- ,- r ate.. a2 q_ , E ,-- C Y 2 2 2 N N o) a) a) N a) a) a) a) a) a) a) E m c 0 c cu 0- a a a a s 0. a a a /� J a) 0 U U U 0 0 0 0 0 0 0 0 0 0 0 0 Y U Ce E.N co 0• O O a) co 0) CO CO N N v O CO O Z O 0 Co 0) N N 0 N N (D N c0 O) I N d O N a+ O O O) m V V V' 0) M y o.^ O 0 . to N- � CO N. v 0 I N- C v CO co U) U.! g - to z N 0 C t 0 0 ,n co co co (0 0 0 0 0 0 0 1i J a� (o CO CO Cr) CO N- N- N- N. N- N- a to /W w z d V a. v Q c as L N I CL ix J a iii '-° O to o rn� o 0 0 0 0 0 o c Q. c ZI J � U 0 0 0 0 0 0 y • Nw a) O a a) o) l0 )f) N N N N N N r 0 a E J to J i... N 0 co CC O a °- �"' a O C� Z N Z u) 10 C > N In 0 a) CO a N C CO o .2 Cl) o w U) Q a• o CC I g) — Q c ZI 0 w w w w : d U 1 00 ❑ C C C in in V) N N Z o 2 00 CO c0 Q' Q' 2 N N Q' CC RI w w w C C C C C -y a) O 0 0 co N 0 O • (0 is c v_ c) > > > > > > E E > 0 C v Z o 0 0 to to U a a v m cC •O "O O Lo Ce y to to co J J J c C C 0 0 c c o) r+ V E o ❑ 0 J y in CO O '0 O Q L C W Q Z N N N y N cc 0 0 0 a) o Q C R r a a)E a Z LL •NO N 0 l0 10 Q CO Q.' .2 01• a. J _I Z in 0+ r ❑ U V C1 G i cc Z la 0 LL1 LL a) oca rn a) ° C 1- a d ) g o ❑ ❑ a a a 0 d g ❑ 1— 3 J 0 H J w w QY L w J J J J J J O O O O N N M } N 01 0 U_ 'N o N O Z F. z_ U 3 QZ z co w cc < cn 0 z o V z Z W 0 e� Ce a 111 w v z > V a o U m a) N Z L o QO z 1—to CL N = co o 2 � s o o 0 u ON a r E U ° ti �, U J Q 3 F— z C� = N LO /yC Q N W m o o 0 Q 0. o 0.Q O a II z 1 vi E o 0 13 U 10 m z m CV V LO i Z O c Lo a� m t '0 O 2 > 3 m N U. 'o a) w O J C > • a) O N Z as as c`• i 1 `� _ r n 0 `o w w , a) co r- U �, �? E I a Q p a� a d E a� 0 3 U <CC U U flCt,CI V CV STATE OF ALASKA JAN 0 3 2013 A CA OIL AND GAS CONSERVATION COMM )N REPORT OF SUNDRY WELL OPERA i IONS AOGCC 1.Operations Abandon ❑ Repair Well Plug Perforations ❑ Perforate ❑ Other Li Start MI Injection Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development❑ Exploratory ❑ 210-105-0 3.Address: P.O.Box 196612 Stratigraphic Service 0 6.API Number: Anchorage,AK 99519-6612 •• 50-029-23429-00-00 7.Property Designation(Lease Number): 8.Well Name and Number: `" ADL0028263 PLRS W-219 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): To Be Submitted PRUDHOE BAY,POLARIS OIL 11.Present Well Condition Summary: Total Depth measured 7128 feet Plugs measured 6879 feet true vertical 5461.75 feet Junk measured None feet Effective Depth measured 6879 feet Packer measured See Attachment feet true vertical 5252.98 feet true vertical See Attachment feet Casing Length Size MD ND Burst Collapse Structural None None None None None None Conductor 80 20"129.5#X-65 35-115 35-115 0 0 Surface 4371 9-5/8"40#L-80 35-4406 35-3432.79 5750 3090 Intermediate None None None None None None Production 7082 7"26#L-80 33-7115 33-5450.77 7240 5410 Liner None None None None None None Perforation depth Measured depth 6634-6664 feet 6724-6756 feet 6794-6844 feet True Vertical depth 5050.01 -5074.87 feet 5124.51-5150.98 feet 5182.46-5223.92 feet Tubing(size,grade,measured and true vertical depth) 3-1/2"9.2#L-80 30-6901 30-5271.26 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 313 0 1563 Subsequent to operation: 0 534 0 0 2800 14.Attachments: 15.Well Class after work: i. Copies of Logs and Surveys Run Exploratory❑ Development❑ Service El Stratigraphic ❑ Daily Report of Well Operations 16.Well Status after work: , Oil ❑ Gas ❑ WDSPIJJ GSTOR ❑ WINJ ❑ WAG IS GINJ ❑ SUSP ❑ SPLUGO 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: AIO 25A.008 Contact Garry Catron Email Garry.CatrontWBP.Corr1 Printed Name Garry Catron Title PDC PE Signature C7S Phone 564-4424 Date 12/31/2012 RBDMS JAN 0 4 2013 •?• /- 7 /3 Form 10-404 Revised 10/2012 Q71) Submit Original Only Packers and SSV's Attachment ADL0028263 SW Name Type MD TVD Depscription W-219 PACKER 6586 4923.28 3-1/2" Baker Premier Ported Packer W-219 PACKER 6688 5007.84 3-1/2" HES MFA Ported Packer W-219 PACKER 6776 5080.64 3-1/2" HES MFA Ported Packer TREE= • CM/ SAF NOTES:H2S READINGS AVERAGE 125 ppm WELLHEAD= FMC W-21 9 WH, J MI."'HESMFAPKRS ARE CUT-TO RELEASE XCTUATOR= HYDRAULIC DESIGNS w17"CUT WINDOW. IX) NOT EXCEED4000 KB.ELEV_ 86.9 I l J I PSI. PKR PRESSURE RATING=5000 PSI(4000 PSI IS BF.ELEV= 51.7' 80%OF PKR RATING) KOP= 264' Max Angle= 56°@ 3608' 1 31' -14-1/2"X 3-1/7'XO,ID=2.992" Datum MD= 6679' Datum TVD= 5000. SS h. 2835' -13-1/2"HES X NIP, ID=2.813" 20"CONDUCTOR,129.5#,X-65,ID=18.770" 80' GAS LIFT MANDRELS 1/1 ST MD TVD DEV TYPE VLV LATCH FORT DATE 19-5/8"CSG,40#,L-80 BTC,ID=8.835' H 4406' 6 6530 4964 34 AMVIG DCR RK 0 11/25/10 WATER INJECTION MANDRELS 7"CSG,26#, L-80 VAM TOPXO TO L-80 TCII H 4927' —X X ST MD TVD DEV TYPE VLV LATCH FORT DATE 5 6630 5046 34 MMG-W DMY RK 0 11/25/10 Minimum ID = 2.750" 6679' 4 6669 5079 34 MMG-W P-15XJR RK 16 08/30/12 3-1/2" HES XN NIPPLE 3 6719 5120 34 MMG-W DMY RK 0 11/25/10 2 6757 5152 34 MMG-W P-15XJR RK 12 08/30/12 3-1/2"PIP TAG H 6549' J- • 1 6819 5203 34 MMG-W P-15XJR RK 12 08/30/12 X Imo/ 6586' --17'X 3-1/2' BOT PREM PORTED PKR,ID=2.875" ' ' 6598' H3-12"HES X NIP,ID=2.813" • 6604' -13-12"NDPG MULTI SUB,ID=2.997 I 7" MARKER JOINT w/RA TAG -1 6600' 1--1 EQ U 6688' H7"X 3-1/2"FES MFA PORTED PKR,ID=2.965" I PERFORATION SUMMARY REF LOG:USIT LOG ON 1122/10 I I 6697' --1 3-1/2"HES X NIP, 10=2.813" ANGLE AT TOP PERF: 34° n 6630' Note: Refer to Production DB for historical pert data • 6703' H3-112"NDPG MULTI SUB,ID=2.997' SIZE SPF ZONE INTERVAL Opn/Sqz DATE 4-1/2" 5 OAb 6634-6664 0 11/25/10 . a 4-1/2" 5 OBc 6724-6756 0 11/25/10 4-1/2" 5 Obd 6791 -6844 0 11/25/10 FQ pl j 6776' IH7"X 3-1/2"HES MFA PORTED R(R,ID=2.900" /�I ' ' 6787' -13-12"HES X NIP, ID=2.813" ■ 6793' -13-12"NDFG MULTI SUB,ID=2.997' I -' 0 ' ' 6858' H3-1/2"HES X NIP,ID=2.813" 'BA__________ 6879' H3-1/2"PXN RUG( 1 08/30/11) 3-1/2"TBG,9.2#,L-80 TCII, .0087 bpf,ID=2.992" -1 6901' - / \ 6901' -13-12"WLEG,ID=2.997' PBTD H 7030' q•','q,',q', q' , 7"LNR,26#,L-80 TCII, .0383 bpf, ID=6.276" -1 7115' ''''•'''''''''''£A A DATE REV BY COMMENTS DATE REV BY COMMENTS POLARIS UNIT 11/25/10 D-14 ORIGINAL COMPLETION 03/08/12 TW/PJC WFR C/O(8/30/11) WELL W-219 12/10/10 PJC DRLG DRAFT CORRECTIONS 03/08/12 1W/PJC ADD I-WIRE/PERF CORRECTION PERMIT No `2101050 12/13/10 1W/PJC FINAL DRLG DRAFT API No 50-029-23429-00 01/11/11 TW/PJC PERF CORRECTIONS SEC 21,T11 N,R12E,469'FNL&1174'FEL 09/21/11 GJF/PJC SET PXN(08/30/11) 01/20/12 TMN/JMD ADDED H2S SAFETY NOTE _ _ � BP Exploration (Alaska) MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Re DATE:Thursday,September 15,2011 Regg c, P.I.Supervisor � � ((Z'7/(( SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC W-219 FROM: Bob Noble PRUDHOE BAY UN POL W-219 Petroleum Inspector Src: Inspector Reviewed By: P.I.Suprv'J&E-- NON-CONFIDENTIAL Comm Well Name: PRUDHOE BAY UN POL W-219 API Well Number: 50-029-23429-00-00 Inspector Name: Bob Noble Insp Num: mitRCN110912142449 Permit Number: 210-105-0 Inspection Date: 9/12/2011 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well W-219 "Type In'. W TVD ! solo • I IA 320 2500 - 2445 2445 - Inj. 2101050 TypeTest SPT Test psi 1500 • OA 210 450 435 435 Interval INITAL p/F P . Tubing 1450 1450 — 1450 1460 Notes: Thursday,September 15,2011 Page 1 of 1 sITAITE ALLAs _ L_,\ a SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 ADMINISTRATIVE APPROVAL NO. AREA INJECTION ORDER 25A.008 Mr. Mark Vandergon BPXA, Base Management Team Lead BP Exploration(Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Request to Allow Enriched Hydrocarbon Gas Injection PBU W-219 (PTD 2101050) Polaris Oil Pool Dear Mr. Vandergon: By letter dated February 21, 2011, BP Exploration (Alaska) Inc. (BPXA) requested approval to allow enriched hydrocarbon gas injection in Well PBU Polaris W-219 (PTD 2101050)). The Alaska Oil and Gas Conservation Commission GRANTS BPXA's request in accordance with Rules 2 and 13 of AIO 25A.000. An Application for Sundry Approval (Form 10-403) is not required; however a Report of Sundry Well Operations (Form 10-404) must be submitted documenting the commencement of enriched gas injection. 5141 DONE at Anchorage, Alaska and dated March 9, 2011. t• " ` L Itfa ,44 Av Daniel T. .eamount, Jr. Cathy .. Foerster -.v,.(,%%4; Commissioner, Chair Commissioner AIO 25A.008 March 9,2011 Page 2 of 2 RECONSIDERATION AND APPEAL NOTICE As provided in AS 31.05.080(a),within 20 days after written notice of the entry of this order or decision,or such further time as the Commission grants for good cause shown,a person affected by it may file with the Commission an application for reconsideration of the matter determined by it. If the notice was mailed,then the period of time shall be 23 days. An application for reconsideration must set out the respect in which the order or decision is believed to be erroneous. The Commission shall grant or refuse the application for reconsideration in whole or in part within 10 days after it is filed. Failure to act on it within 10-days is a denial of reconsideration. If the Commission denies reconsideration,upon denial,this order or decision and the denial of reconsideration are FINAL and may be appealed to superior court. The appeal MUST be filed within 33 days after the date on which the Commission mails,OR 30 days if the Commission otherwise distributes,the order or decision denying reconsideration,UNLESS the denial is by inaction,in which case the appeal MUST be filed within 40 days after the date on which the application for reconsideration was filed. If the Commission grants an application for reconsideration,this order or decision does not become final. Rather, the order or decision on reconsideration will be the FINAL order or decision of the Commission,and it may be appealed to superior court. That appeal MUST be filed within 33 days after the date on which the Commission mails,OR 30 days if the Commission otherwise distributes,the order or decision on reconsideration. As provided in AS 31.05.080(b),"[t]he questions reviewed on appeal are limited to the questions presented to the Commission by the application for reconsideration." In computing a period of time above,the date of the event or default after which the designated period begins to run is not included in the period; the last day of the period is included,unless it falls on a weekend or state holiday, which event the period runs until 5:00 p.m.on the next day P Y, P o s P Y that does not fall on a weekend or state holiday. WELL LOG TRANSMITTAL To: State of Alaska January 20, 2011 Alaska Oil and Gas Conservation Commission Attn.: Christine Shartzer 333 West 7th Avenue, Suite 100 Anchorage,Alaska 99501-3539 RE: LWD Formation Evaluation Logs: W-219 AK-MW-0007526552 W-219 50-029-23429-00 2"x 5" MD Triple Combo Logs: 1 Color Log 2"x 5"TVD Triple Combo Logs: 1 Color Log W-219PB1 50-029-23429-70 2" x 5" MD Triple Combo Logs: 1 Color Log 2"x 5"TVD Triple Combo Logs: 1 Color Log W-219PB2 50-029-23429-71 2"x 5"MD Triple Combo Logs: 1 Color Log 2"x 5"TVD Triple Combo Logs: 1 Color Log Digital Log Images&LWDG-formatted LIS Data w/verification listing; 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Attn: Bryan Burinda 6900 Arctic Blvd. _ Anchorage,Alaska 99518 .9/0-(D 5 C(095— Office: 907-273-3536 Fax: 907-273-3535 BryarP da�alhbi acri. om b"- ,7 Date: - Signed: a„ :,,,„,,..„ ___,:: ,, ,,,,,, , ,,.,,„. ::_,, ,,:„,„ .,,, \, :. :,,,:,_,, . . . • • • ITE-ChARICIa. INTEGRITY RUM • .. ,,,,................ ...........m......*r-.I. . SPUD DATE : -. lati/216 OPER & FIELD ge :-- eyetA P.9. (uris p6• 1 RIG RELEASE, : • //72.1442_ WELL NUMBER W- 2, I ......, • ,f71;LL DATA c.f.D1 .41. Tn.; PBTD : 1•2) :IND ,...c, ..........____ v"- Casing : "( 7,3 . sbcie::1121.20 3f33‘TVIJI DV: , .3in . .. .• .T.VD 14-r: 7 —7 11 e r -7 I 1 5".yx S1'15 'ND ; TOP : MD TVD ubing : 1:icktr MD TVD ; Set. at Fonie. S-1,2:e • r.7C." enti i Perfs (045(i to 6P-ri ...• . ...........,___ IA q. -Tc.p MICUNICZ INTEGRITY - MT fl . knnuiv.IF Prces To.st: iYilotie) ; 15 Mills 395o ; 30 Mill g47±G C°mourn t • • . • ME,CliA,NICA_L INTEGRITY - PART e 2 rn 7 /V Cement VO C E -AlIIIIIIS : I..nat 6‘•••"" Ca -- • . . ---- ---...- ,...0 DV • • • Cmr vol to cover perf,s ' &Z. h kt CiZZ2r9 eirl-c- 0...-/- ,/ao ) .••■-•wa........w.,--rz •-zocse,rs-.,-.-rvItan,T .s-rsir, ,-ce....ras.A....tic...-stssx....,.....,...1.,z...- • 7:heor e tic z.1 TOC 5 3e2e)' ....v." ...,_._, ......"No,. .as.oupearsassnoyevmmswemnrawromorld.w. Noroe-m................. .- • • /1■44 \ ll-- c-/&Y (.( /'-FL (.4.s' /T *62.4.._ _________,— Cement Bond. or No) to- ri—; In AOGCC File........ 4111t) CBI. Evaluation, on above peals _c..42 $2...."."7"..."......12.4"."÷".. LA, Ceal, 5e_e er• et-K CC.,— J) ) Production Log: Type /44 1 Evaluation . . - ---- • ' CONCLUSIONS : . . • ?irt ill : 1144-hes5,,, /14 1T- M (--.4.,,- 1:„..,.„....„7,--;,,,,,. . c,„ion Pa,rt. i 2 :- ,..• Ce.s...e.A4 a‘cor ;s ....ejec...,...Wwe- , 1444,4ze•Ae -r:•• _: .S.`e.-r tlic,e_ --Z.---.7"--:: ,=---7.=-..— 0 INj . ?). _ /ert. .----g. • 7X---;1,.,,<I,•-- /. -i/ • O m N • E .• e g o U . `m y I U m m u Ym c am Z 7 lca N o Aba m U 3n m t O ZO=ig co la g-(:1°Y Q , U m q V/QRQ _ - ._N Q 9 4 �1• y♦ �' m g EE u .4i • 44.„,_ .o a00 �Nu 2 0 At A ∎..,A11 � bL , •.► Q"'a` 0 5.7:5 _ pa4,N aa-aaaoFa O ...NO O N s7 t'1 N N N N l7'` 'a `,'""`,' O_O-00- li ri!, .01 \ 1a O o l U .c \ I C) 3 r v • a ■$ I 7` ��� �.r�bC1 c0i t0 14 J ` ti L111 lf� •rte; 0 JJm i I I I . Z wJ ,,Y .m a'a'��`��`J����ll'''VVV�JJJ �w,�- • s 0 7 LLLL ' aaaLL V . I-O•V f 00 Z200 c I :F UJ J K K O O O K m Oaa FFaa 2 20 p WW2O2222f-ZF►,Zw 4 0 72CK Z tam i?2 .momm 20 '-ml7Nm P.O 2N2t8S V p mom 1`NON o h l7 NNAg pl� NmSNN pN1� Nf ON� gg S O O 8$g 0 0 0 m a 94 0. U mammammmmammammmmmmmmm M CL =SC IlL j n W Y N a ee' Q m -I%U @1 :; 1 N.N m agg.N Yf Z 6 6 2 w W N Y J a m ard`a ama • k STATE OF ALASKA 4 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ❑ Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ❑Suspended lb. Well Class: 20AAC 25.105 20AAC 25.110 ❑ Development ❑Exploratory ❑ GINJ ®WINJ ❑WAG ❑WDSPL ❑Other No.of Completions One =' Service ❑Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska)Inc. 11/25/2010 210-105 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 10/31/2010 50-029-23429-00-00 4a. Location of Well(Govemmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 11/18/2010 PBU W-219 4811'FSL, 1177' FEL, SEC.21,T11 N, R12E, UM 8. KB(ft above MSL): 86.90' 15.Field/Pool(s): Top of Productive Horizon: 212'FSL,2310'FWL,SEC. 15,T11 N, R12E, UM GL(ft above MSL): 52.1' Prudhoe Bay Field/Polaris Pool Total Depth: 9.Plug Back Depth(MD+TVD): 487'FSL,2304'FWL, SEC. 15,T11 N, R12E, UM 7030' 5379' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 612049 y- 5959788 Zone- ASP4 7128 5462 ADL 028263 TPI: x- 615524 y- 5960522 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 615514 y- 5960797 Zone- ASP4 N/A 18.Directional Survey: 0 Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD,GR, RES, NEU,AZI DEN, PWD, USIT 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE TOP I BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 129.5# X-65 Surface 112' Surface 112' 42" -260 sx Arctic Set 9-5/8" 40# L-80 35' 4406' 35' 3433' 12-1/4" 1933 sx Arctic Set Lite.407 sx Class'G' 7" 26# L-80 33' 7115' 33' 5451' 8-3/4" 281 sx Class'G' 24. Open to production or injection? ® Yes ❑No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD+TVD of Top&Bottom;Perforation Size and Number): ( ) (MD/ND) 4-1/2"Gun Diameter,5 SPF 3-1/2",9.2#, L80 6901' 6586'/5010' MD TVD MD -._TVE), .... 6776',6688'/5168',5095' 6634'-6664' 5050'-5075' # t::: ''+`,iCit i 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 6724'-6756' 5125'-5151' / 6794'-6844' 5182'-5224' ! :^ ,,,0,apEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED t;: / I Freeze Protect with 85 Bbls of Diesel 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): Not on Injection N/A Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? ❑ Yes 0 No Sidewall Core(s)Acquired? ❑Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. RECEIVED None DEC 2 1 2010 RBDMS DEC 2.210'q Alaska(3d&Lias Cons.Commission Form 10-407 Revised 12/2009 CONTINUED ON REVERSE Anchorage Submit Original Only /•G*II G 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Well Tested? ❑ ®No Permafrost Top 35' 35' If yes,list intervals and formations tested,briefly summarizing test Permafrost Base 2050' 1932' results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Top of Ugnu 4474' 3474' Ugnu MA 6133' 4643' None Ugnu MB1 6192' 4690' Ugnu MB2 6251' 4737' Schrader Bluff NA 6398' 4856' Schrader Bluff NB 6400' 4858' Schrader Bluff NC 6440' 4890' Schrader Bluff NE 6452' 4900' Schrader Bluff NF 6518' 4954' Schrader Bluff OA 6562' 4990' Schrader Bluff OBa 6627' 5044' Schrader Bluff OBb 6663' 5074' Schrader Bluff OBc 6719' 5120' Schrader Bluff OBd 6789' 5178' Schrader Bluff OBe 6874' 5249' Schrader Bluff OBf 6924' 5290' Schrader Bluff OBf Base/ 6981' 5338' Top Colville Mudstone Formation at Total Depth(Name): Top Colville Mudstone 6981' 5338' 31.List of Attachments: Summary of Daily Drilling Reports,Well History Summary,Well Schematic Diagram,Surveys and a Leak-Off Test Summary. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Sondra t_j � Title: Drilling Technologist Date: PBU W-219 210-105 Prepared By NameiNumber. Sondra Stewman,564-4750 Well Number Permit No./Approval No. Drilling Engineer: Mark Staudinger,564-5733 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only TREE= CM/ SAFE' 1TES:***HES MFA PKRS ARE CUT-TO WELLHEAD= FMC W-21 9 RELEA-DESIGNS w/7"CUT WINDOW. DO NOT ACTUATOR= HYDRAULIC EXCEED 4000 PSI. PKR PRESSURE RATING= KB. ELEV = 86.9' ------------------ --- I l ) I 5000 PSI(4000 PSI IS 80%OF PKR RATING) BF. ELEV= 51.7' KOP= 264' 31' J-I4-1/2"X 3-1/2"X0, ID=2.992" Max Angle= 56°@ 3608' Datum MD= 6679' 2835' H3-1/2"HES X NIP,ID=2.813" I Datum TV D= 5000.SS GAS LIFT MANDRELS 20"CONDUCTOR, 129.54,X-65, ID=18.770" --I 80' ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 6530 4964 34 MMG DCR RK 0 11/25/10 9-5/8"CSG,40 4, L-80 BTC, ID=8.835" -I 4406' WATER INJECTION MANDRELS 7"CSG,26#,L-80 VA M TOP XO TO L-80 TCII -I 4927' I-X x ST MD TV D DEV TYPE VLV LATCH PORT DATE 5 6630 5046 34 MMG-W DMY RK 0 11/25/10 Minimum ID =2.750" @ 6679' MP 4 6669 5079 34 MMG-W DMY RK 0 11/25/10 3 6719 5120 34 MMG-W DMY RK 0 11/25/10 3-1/2" HES XN NIPPLE 2 6757 5152 34 MMG-W DMY RK 0 11/25/10 1 6819 5203 34 MMG-W DMY RK 0 11/25/10 3-1/2"PIP TAG -I 6549' I - • pl x---I 6586' I-17"X 3-1/2"BOT PREM PORTED PKR, ID=2.875" ' , 6598' 1-13-1/2"HES X NIP, ID=2.813" I • I 6604' H 3-1/2"NDPG MULTI SUB,ID=2.992" I 7" MARKER JOINT w/RA TAG H 6600' I- 111 Ma 6688' I--17"X 3-1/2"HES MFA PORTED PKR,ID=2.965" I I 6697' -I3-1/2"HES X NIP, ID=2.813" I • [ 6703' 1-13-1/2"NDPG MULTI SUB, ID=2.992" I PERFORATION SUMMARY No 0 REF LOG:USIT LOG ON 11/22/10 ANGLE AT TOP PERF:34° @ 6630' WI Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 6776' H 7"X 3-1/2"HES MFA PORTED PKR, ID=2.900" 4-1/2" 5 6634-6664 0 11/25/10 4-1/2" 5 6724-6756 0 11/25/10 ' ' 6787' H 3-1/2"HES X NIP, ID=2.813" I 4-1/2" 5 6794-6844 0 11/25/10 • 6793' H3-1/2"NDPG MULTI SUB, ID=2.992" I iliM — ' ' — 6858' H3-1/2"HES X NIP, ID=2.813" I 18I 6879' H 3-1/2"HES XN NIP, ID=2.750" I � � -I3-1/2"PXN PLUG( / / ) I 3-1/2"TBG,9.2#,L-80 TCII, .0087 bpf, ID=2.992" H 6901' I - i ----\ 6901' -I 3-1/2"WLEG, ID=2.992" I PBTD -I 7030' 7"LNR,26#,L-80 TCII, .0383 bpf, ID=6.276" H 7115' MAAWA0'4 DATE REV BY COMMENTS DATE REV BY COMMENTS POLARIS UNIT 11/25/10 D-14 ORIGINAL COMPLETION WELL: W-219 12/10/10 PJC DRLG DRAFT CORRECTIONS PERMIT No: 1101050 12/13/10 TW/PJC FINAL DRLG DRAFT API No: 50-029-23429-00 SEC 21,T11 N,R12E,469'FNL&1174'FEL BP Exploration(Alaska) North America -ALASKA- BP Page 1 of 15 Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE(DON) I Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/27/2010 00:00 - 12:00 12.00 MOB N WAIT 5.60 PRE ACCEPT RIG FROM MAINTENANCE AT MIDNIGHT WAIT ON PAD PREP CONTINUE ASSEMBLING BOP STACK MAKE UP TOP DRIVE QUILL REMOVE TOP DRIVE WASHPIPE FOR REPLACEMENT "'WELD TOEBOARD ON TO DERRICK BOARD HANDRAIL AND PAINT SAME INDENTIFY NON-CERTIFIED PAD EYES IN DERRICK AND PAINT RED INSTALL VALVE HANDLE STEMS FOR OPERATING SUCTION PUMPS IN PITS MECHANIC CHECKED BACKLASH ON TOP DRIVE MAIN BEARING 00:00 - 12:00 12.00 MOB N WAIT 5.60 PRE ACCEPT RIG FROM MAINTENANCE AT MIDNIGHT WAIT ON PAD PREP CONTINUE ASSEMBLING BOP STACK MAKE UP TOP DRIVE QUILL REMOVE TOP DRIVE WASHPIPE FOR REPLACEMENT WELD TOEBOARD ON TO DERRICK BOARD HANDRAIL AND PAINT SAME INDENTIFY NON-CERTIFIED PAD EYES IN DERRICK AND PAINT RED INSTALL VALVE HANDLE STEMS FOR OPERATING SUCTION PUMPS IN PITS MECHANIC CHECKED BACKLASH ON TOP DRIVE MAIN BEARING 12:00 - 00:00 12.00 MOB N WAIT 5.60 PRE CONTINUE TO WAIT ON PAD PREP INSTALL DEMCO VALVE ON CEMENT LINE AND TRASH PUMP MANIFOLD IN CELLAR TUBOSCOPE TO CRACK CHECK NEW PAD EYE INSTALLATIONS CONTINUE TO WORK ON ASSEMBLING TOOLS RETURNED FROM INSPECTION INSTALL NEW SWIVEL PACKING IN TOP DRIVE INSTALL DRIP PAN INSTALL MOPUSEHOLE AND HEATER IN CELLAR 12:00 - 00:00 12.00 MOB N WAIT 5.60 PRE CONTINUE TO WAIT ON PAD PREP INSTALL DEMCO VALVE ON CEMENT LINE AND TRASH PUMP MANIFOLD IN CELLAR TUBOSCOPE TO CRACK CHECK NEW PAD EYE INSTALLATIONS CONTINUE TO WORK ON ASSEMBLING TOOLS RETURNED FROM INSPECTION INSTALL NEW SWIVEL PACKING IN TOP DRIVE INSTALL DRIP PAN INSTALL MOPUSEHOLE AND HEATER IN CELLAR Printed 12/20/2010 9:02:53AM • North America -ALASKA- BP Page 2 of 15 • Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project: Prudhoe Bay Site: PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/28/2010 00:00 - 12:00 12.00 MOB N WAIT 5.60 PRE STANDBY WAITING ON PAD PREP BUILD AIR SLIP DIES AND ASSEMBLE COLLAR SLIPS CONTINUE INSTALLING SKIRTING AROUND SHAKERS CONTINUE PAINTING ALL NON-CERTIFIED PAD EYES RED MOBILIZE SAFETY VALVES AND CROSSOVERS TO RIG FLOOR INSTALL EQUALIZER LINE IN TRIP TANK CHANGE IRON ROUGHNECK SPINNER ROLLERS MAKE UP 6"MUD BUCKET DRAIN LINE 12:00 - 16:00 4.00 MOB N WAIT 5.60 PRE STANDBY WAITING ON PAD PREP CONTINUE PAINTING ALL NON-CERTIFIED PAD EYES RED MOVE FIRE EXTINGUISHER BEHIND DRILLER'S CONSOLE TO A MORE ACCESSIBLE LOCATION HANG SURFACE ANNULAR IN CELLAR IN PREPARATION FOR RIG MOVE 16:00 - 18:00 2.00 MOB P PRE PREP RIG FLOOR FOR SKIDDING BACK BLOW DOWN STEAM LINES AND TURN OFF AIR TO RIG FLOOR 18:00 - 19:00 1.00 MOB P PRE SKID RIG FLOOR TO CENTER OF RIG FOR RIG MOVE 19:00 - 20:00 1.00 MOB P PRE PREP RIG TO MOVE OFF OF RIG MATS INSTALL KNIFE VALVE/DIVERTER ON W-219 20:00 - 21:00 1.00 MOB P PRE MOVE RIG OFF OF MATS 21:00 - 00:00 3.00 MOB P PRE FINISH LAYING RIG MATS AROUND WELL SPOT WELLHEAD,TREE,TUBING SPOOL, TUBING HEAD ADAPTER,AND BACKUP SLIPLOCK WELLHEAD BEHIND WELL LAY RIG MATS DOWN ACCESS ROAD FOR RIG MOVE 10/29/2010 00:00 - 02:00 2.00 MOB P PRE MOVE RIG FROM MAINTENANCE LOCATION ON NORTH END OF PAD TO W-219 02:00 - 04:30 2.50 MOB P PRE CENTER AND LEVEL RIG ABOVE W-219 WELLHEAD 04:30 - 06:00 1.50 MOB P PRE SPOT RIG OVER WELL LAY RIG MATS FOR ROCK WASHER HERCULITE PAD SPOT DIVERTER LINE 06:00 - 07:00 1.00 MOB P PRE SKID RIG FLOOR OVER WELL 07:00 - 15:00 8.00 MOB P PRE SPOT SLOP TANK FOR ROCK WASHER AND ROCK WASHER INSTALL BERM AROUND ROCK WASHER AND SLOP TANK SPOT TIGER TANK NIPPLE UP DIVERTER LINE RIG UP RIG FLOOR NIPPLE UP STACK LOAD PIPE SHED WITH SURFACE BHA AND 4" DRILLPIPE 15:00 - 20:00 5.00 MOB P PRE BRING FRESHWATER ON AND MONITOR PITS FOR LEAKS MOVE FRESHWATER TO INDIVIDUAL PITS TO Q/C ELECTRONIC PVT CALIBRATION -ADJUST AS NEEDED CONTINUE TO LOAD PIPE INTO PIPE SHED Printed 12/20/2010 9:02:53AM • North America -ALASKA- BP Page 3 of 15 Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE (DON) Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 23:00 3.00 MOB P PRE THAW OUT CONDUCTOR CONTINUE TO Q/C ELECTRONIC PIT VOLUME CALIBRATION ADJUST PIPE SKATE 23:00 - 00:00 1.00 MOB P PRE BUILD DRILLPIPE STANDS 10/30/2010 00:00 - 05:00 5.00 MOB P PRE BUILD DRILLPIPE STANDS WHILE BUILDING STANDS,CONTINUE FINAL CALIBRATION OF PIT PVT SYSTEM 05:00 - 06:30 1.50 RIGU P PRE RIG UP TO TEST DIVERTER SYSTEM 06:30 - 08:30 2.00 BOPSUR N RREP 5.60 PRE CHANGE OUT KNIFE VALVE DUE TO LEAKING HYDRAULIC FITTING FUNCTION TEST KNIFE VALVE AND ANNULAR -KNIFE VALVE LEAKING DUE TO FAILED HYDRAULIC FITTING /1 -< 1 CUP HYDRAULIC FLUID SPRAYED ON CELLAR WALL.NO FLUID ON GROUND -5700 NOTIFIED,FLUID CLEANED UP AND DISPOSED IN OILY WASTE BAGS SEE TRACTION REPORT 3664473 FOR MORE INFORMATION 08:30 - 09:00 0.50 BOPSUR P PRE TEST ANNULAR PREVENTER,KNIFE VALVE, AND KOOMEY UNIT PER AOGCC,BP REGULATIONS AND POLICIES -3,000 PSI SYSTEM PRESSURE -KNIFE VALVE OPENED IN 9 SECONDS -21-1/4"ANNULAR CLOSED AROUND 4" DRILLPIPE IN 39 SECONDS -SYSTEM PRESSURE 1,850 PSI AFTER ANNULAR AND KNIFE VALVE FUNCTIONED -200 PSI RECOVERY IN 37 SECONDS -KOOMEY UNIT TO RECOVER FULL PRESSURE IN 2 MIN 29 SECONDS 09:00 - 10:30 1.50 RIGU N RREP PRE FLUSH MUD PUMPS WITH FRESH WATER FIX LEAK IN MUD BUCKET LINE TROUBLESHOOT#1 MUD PUMP STROKE COUNTER 10:30 - 15:00 4.50 RIGU P PRE EXTEND DIVERTER LINE ONE EXTRA SECTION DUE TO PLACEMENT OF HALLIBURTON WIRELINE TRUCK -WIRELINE FOR GYRO CHAIN OFF FLOWLINE TO RISER SURFACE TEST HIGH PRESSURE LINES TO 3,000 PSI CALIBRATE TOTCO DEPTH TRACKING REPAIR#1 MUD PUMP STROKE COUNTER 15:00 - 16:00 1.00 RIGU P PRE REMOVE WATER FROM PITS BRING ON DRILLPLEX MUD TO PITS 16:00 - 17:00 1.00 RIGU P PRE MAKE UP 5"HWDP,JARS,5"HWDP AND RACK BACK MAKE UP 8"FLEX COLLARS AND RACK BACK CONTINUE TO TAKE ON DRILLPLEX MUD WHILE BUILDING BHA COMPONENTS Printed 12/20/2010 9.02:53AM • 'North America -ALASKA- BP Page 4 of 15 Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project: Prudhoe Bay Site: PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:00 - 20:00 3.00 RIGU P PRE MAKE UP SURFACE DRILLING BHA#1 AS FOLLOWS: -HUGHES MXL-1X MILL TOOTH RICK BIT -SPERRY MUD MOTOR 1.50 DEGREE BEND -FLOAT SUB -MANDREL STABILIZER -CROSSOVER SUB -DM COLLAR -GR/HCIM COLLAR -POS PULSER -UBHO SUB 20:00 - 20:30 0.50 RIGU P ■- PRE HOLD PRE-SPUD MEETING IN DOGHOUSE WITH RIG CREW,SUPPORT CREW, TOOLPUSHER AND WSL 20:30 - 21:30 1.00 RIGU P PRE FILL CONDUCTOR AND RISER WITH SPUD MUD AND INSPECT FOR LEAKS TIGHTEN KNIFE VALVE BOLTS TIGHTEN RISER FLANGE ABOVE ANNULAR PREVENTER ANNULAR PREVENTER LEAKING AT KOOMEY HOSE FITTINGS -REPLACE FITTINGS 21:30 - 00:00 2.50 DRILL P SURF TAG BOTTOM OF CONDUCTOR AT 112' DRILL FROM 112'TO 169'MD -PUW 60K,SOW 60K, ROT 59K -320 GPM,320 PSI ON,270 PSI OFF -50 RPM,TQ 1-5K ON,1K OFF MW IN AND OUT 8.6 PPG AST 0,ART 0.59,ADT 0.59 HELD D3 DIVERTER DRILL ADT FOR LAST 24 HRS:0.59 HRS 10/31/2010 00:00 - 01:00 1.00 DRILL P ®_ SURF DRILL AHEAD FROM 169'TO 249'MD CONVEYOR IN PITS LOCKED UP 01:00 - 02:30 1.50 DRILL P SURF ATTEMPT TO SHOVEL OUT CONVEYOR -UNABLE TO GET DRAG CHAIN MOVING RIG UP SUPERSUCKER AND SUCK OUT CONVEYOR -SUCCESSFUL IN RESTARTING DRAG CHAIN -INCREASE DRAG CHAIN SPEED TO HANDLE RETURN GRAVEL 02:30 - 05:00 2.50 DRILL P ■ SURF DRILL AHEAD FROM 249'TO 354'MD -STOP AND RUN GYRO FOR SURVEY EVERY STAND(90') 05:00 - 05:30 0.50 DRILL P SURF POOH,RACK BACK 3 STANDS 4"HWDP IN DERRICK 05:30 - 06:00 0.50 DRILL P SURF PICK UP 1 STAND 8"FLEX COLLARS PICK UP JAR STAND -1 JT 5"HWDP -DRILLING JAR -1 JT 5"HWDP PICK UP 1 STAND 4"HWDP Printed 12/20/2010 9:02.53AM North America -ALASKA- BP Page 5 of 15 Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project:Prudhoe Bay Site: PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 12:00 6.00 DRILL P SURF DRILL AHEAD FROM 354'TO 629'MD -GYRO SURVEY AT EVERY CONNECTION -PUW 77K,SOW 75K, ROT 76K -500 GPM,1,110 PSI ON,880 PSI OFF -60 RPM,TQ 2K ON,1K OFF -25K WOB -MW 8.9 PPG IN,9.1 PPG OUT ART 0.52;AST 3.44;ADT 3.96 12:00 - 00:00 12.00 DRILL P SURF DIRECTIONALLY DRILL FROM 629'TO 1,684'. MD -CRY. RYO SURVEY EVERY CONNECTION UNTIL CLEAN SURVEYS AT 631'MD -RIG DOWN GYRO AFTER TWO CLEAN MWD SURVEYS AT 903'MD -PUW 96K,SOW 84K,ROT 91K -600 GPM,2,200 PSI ON,2,000 PSI OFF -80 RPM,TO 5K ON,2K OFF -25K WOB -MW 9.1 PPG IN,9.3 PPG OUT ART 2.90;AST 4.54;ADT 7.44 TOTAL ADT FOR LAST 24 HRS: 11.40 HRS SPILL DRILL 11/1/2010 00:00 - 02:30 2.50 DRILL P SURF DIRECTIONALLY DRILL AHEAD FROM 1,684' TO 1,954'MD -PUW 98K,SOW 85K, ROT 92K -575 GPM,2,180 PSI ON,1,850 PSI OFF -60 RPM,TQ 4K ON,2K OFF -25K WOB -9.1 PPG MW IN,9.3 PPG MW OUT 02:30 - 04:00 1.50 DRILL P SURF PUMP OUT 45'TO AVOID WASHING OUT SLIDE CIRCULATE BOTTOMS-UP 3X -RACK BACK ONE STAND AT EVERY BOTTOMS-UP -575 GPM,1,850 PSI -9.1 PPG MUD WT IN 9.2 PPG MUD WT OUT FLOW CHECK WELL FOR 10 MINUTES AFTER CIRCULATION -NO FLOW 04:00 - 05:30 1.50 DRILL P SURF POOH FROM 1,954'TO 263'MD -RACK BACK DRILLPIPE -9.1 PPG MUD WT IN AND OUT 05:30 - 07:30 2.00 DRILL P SURF RIH FROM 263'TO 1,954'MD -WASH DOWN LAST STAND -100 GPM,540 PSI STAGE UP PUMPS TO DRILLING RATE 07:30 - 12:00 4.50 DRILL P SURF DIRECTIONALLY DRILL FROM 1,954'TO 2,425' MD -PUW 105K,SOW 80K, ROT 97K -600 GPM,2,530 PSI ON,2,320 PSI OFF -80 RPM,TQ 5K ON,2K OFF -25K WOB -9.4 PPG MUD WT IN,9.7 PPG OUT ART 1.70;AST 2.07;ART 3.77 HELD SPILL DRILL Printed 12/20/2010 9:02:53AM North America -ALASKA- BP Page 6 of 15 Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project: Prudhoe Bay Site: PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 00:00 12.00 DRILL P SURF DIRECTIONALLY DRILL FROM 2.425'TO 4.138' MD -PUW 117K,SOW 93K, ROT 105K -575 GPM,2,930 PSI ON,2,750 PSI OFF -100 RPM,TQ 5K ON,4K OFF -5K WOB -9.5 PPG MUD WT IN,9.6 PPG MUD WT OUT ART 7.02;AST 0.62;ADT 7.64 ADT LAST 24 HOURS: 11.41 HRS HELD FIRE DRILL 11/2/2010 00:00 - 02:00 2.00 DRILL P SURF nIRFCTIONAI I Y nRII I FROM 4 138'TO 4 422' _ MD -cc? -TD CALLED BY GEOLOGIST AND WSL -PUW 120K,SOW 92K,ROT 105K -600 GPM,3,370 PSI ON,3,060 PSI OFF -100 RPM,TQ 9K ON,5K OFF 45K WOB -9.4 PPG MUD WT IN,9.6 PPG MUD WT OUT 02:00 - 04:30 2.50 DRILL P SURF OBTAIN FINAL SURVEY AT TD CIRCULATE BOTTOMS UP 3 TIMES -650 GPM,3,500 PSI -100 RPM,TQ 8K -PULL AT RATE OF ONE STAND EVERY 30 MINUTES -SHAKERS CLEAN STOP AND FLOW CHECK -NO FLOW 04:30 - 05:30 1.00 DRILL P SURF BLOW DOWN TOP DRIVE POOH ON ELEVATORS FROM 4,142'TO 3,640' MD -9.4 PPG MUD WT IN AND OUT TAKING 25-30K OVERPULL AT 3,440'MD -UNABLE TO WIPE CLEAN 05:30 - 08:30 3.00 DRILL P SURF RIH TO BOTTOM OF STAND AT 3,665'MD SCREW IN TOP DRIVE AND BEGIN BACKREAMING OOH FROM 3,665'TO 2,333' MD -550 GPM,2,340 PSI -80 RPM,TQ 5K -9.3 PPG MUD WT IN AND OUT -BAKREAMING AT 15 MIN/STAND 08:30 - 09:00 0.50 DRILL P SURF CBU -ROTATE AND RECIPROCATE -100 RPM -600 GPM,2,330 PSI -STAND BACK 1 STAND FROM 2,333'TO 2,238'MD FIRE DRILL=1:15 MIN 09:00 - 10:00 1.00 DRILL P SURF POOH ON ELEVATORS FROM 2,238'TO 1,762' MD 10:00 - 11:30 1.50 DRILL P SURF RIH FROM 1,762'TO 1,940'MD -FOUND TIGHT SPOT AT 1,930'MD ATTEMPT TO WORK PIPE PAST TIGHT SPOT. -NO SUCCESS. 11:30 - 13:30 2.00 DRILL P SURF POOH ON ELEVATORS FROM 1,940'TO 1,380' MD 13:30 - 15:30 2.00 DRILL P SURF LD BHA -MXL-1X BIT GRADING:2-4-BT-G-3-3-BU-TD Printed 12/20/2010 9:02:53AM North America -ALASKA- BP Page 7 of 15 • Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project: Prudhoe Bay Site: PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 16:30 1.00 CASING P SURF CLEAR AND CLEAN RIG FLOOR 16:30 - 18:30 2.00 CASING P SURF CHANGE OUT SAVER SUB AND JAWS ON TOP DRIVE TO 4-1/2"IF IN PREPARATION FOR TESCO 18:30 - 21:00 2.50 CASING P SURF HANG CONTROL LINE IN DERRICK FOR TESCO. INSTALL TESCO UNIT ON TOP DRIVE. 21:00 - 22:00 1.00 CASING P SURF MAKE DUMMY WITH HANGER 22:00 - 23:00 1.00 CASING P SURF RU TO RUN 9-5/8"40#BTC-M CASING 23:00 - 00:00 1.00 CASING P SURF MU SHOE TRACK 11/3/2010 00:00 - 04:30 4.50 CASING P SURF RUN 9-5/8"40#, L-80, BTC-M CASING FROM SURFACE TO 1,936'MD -USING TESCO CASING RUNNING TOOL -TORQUE RINGS IN ALL CONNECTIONS -MAKE UP TORQUE-15,000 FT-LBS -CONSISTENT MUD LOST WHILE RUNNING IN HOLE EQUIVALENT TO DISPLACEMENT OF PIPE SLOW RUNNING SPEED -NO CHANGE IN LOSSES 04:30 - 12:00 7.50 CASING N DPRB 1,941.60 SURF FOUND LEDGE AT 1,936'MD WORK PIPE AS NEEDED TO OVERCOME LEDGE WORK TIGHT SPOT FROM 1,930 TO 1,938' -USING TESCO CDS UNIT -PUW-120K;SOW-100K;RTW-110K -20-100 RPM;10-15K TQ -118 GPM;230 PSI. ***SPILL DRILL-1:41 MIN*** 12:00 - 00:00 12.00 CASING N DPRB 1,941.60 SURF WORK CASING THROUGH TIGHT SPOT FROM 1,938'TO 2,025'MD -USING TESCO CDS UNIT -AVERAGE ROP=10 FT/HR -PUW-120K;SOW-100K;RTW-110K -20-100 RPM;10-15K TQ -WOB40-65K -118 GPM;180-450 PSI. ***FIRE DRILL- 55 SEC**** 11/4/2010 00:00 - 14:30 14.50 CASING N DPRB 1,941.60 SURF WORK PIPE AS NEEDED TO OVERCOME TIGHT SPOTS/OBSTRUCTIONS -PROGRESS INCREASED TO 60 FT/HR FOR A 40'SECTION BELOW BASE OF PERMAFROST -HUNG UP AT 2,070'.UNABLE TO MAKE PROGRESS 00:00 - 14:30 14.50 CASING N DPRB 1,941.60 SURF WORK PIPE AS NEEDED TO OVERCOME TIGHT SPOTS/OBSTRUCTIONS -PROGRESS INCREASED TO 60 FT/HR FOR A 40'SECTION BELOW BASE OF PERMAFROST -HUNG UP AT 2 070' UNABI E TO MAKE PRC)1RFSS 14:30 - 20:30 6.00 CASING N DPRB 1,941.60 SURF PULL OUT OF HOLE AND LAY DOWN W/9-5/8" CSG.TO SHOE TRACK. 14:30 - 20:30 6.00 CASING N DPRB 1,941.60 SURF PULL OUT OF HOLE AND LAY DOWN W/9-5/8" CSG.TO SHOE TRACK. 20:30 - 21:30 1.00 CASING N DPRB 1,941.60 SURF BREAK THREAD LOCK SHOE TRACK AND LAY DOWN -SEVER WEAR ON SHOE. ALL CUTTING STRUCTURE GONE. Printed 12/20/2010 9:02:53AM North America -ALASKA- BP Page 8 of 15 Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE (DON) Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 21:30 1.00 CASING N DPRB 1,941.60 SURF BREAK THREAD LOCK SHOE TRACK AND LAY DOWN -SEVER WEAR ON SHOE. ALL CUTTING STRUCTURE GONE. 21:30 - 22:30 1.00 CASING N DPRB 1,941.60 SURF LAY DOWN TESCO TOOL 21:30 - 22:30 1.00 CASING N DPRB 1,941.60 SURF LAY DOWN TESCO TOOL 22:30 - 00:00 1.50 CASING N DPRB 1,941.60 SURF CHANGE OUT SAVER SUB&JAWS ON TOP DRIVE.TO 4"HT38 22:30 - 00:00 1.50 CASING N DPRB 1,941.60 SURF CHANGE OUT SAVER SUB&JAWS ON TOP DRIVE TO 4"HT38 11/5/2010 00:00 - 01:30 1.50 CASING N DPRB 1,941.60 SURF CHANGE SAVER SUB AND TOP DRIVE JAWS TO 4"HT38 01:30 - 03:30 2.00 CASING N DPRB 1,941.60 SURF RIG DOWN CEMENT HOSE AND INSTALL KELLY HOSE ON TOP DRIVE. HANG BALES AND ELEVATORS 03:30 - 04:00 0.50 CASING N DPRB 1,941.60 SURF CLEAR RIG FLOOR 04:00 - 06:00 2.00 CASING N DPRB 1,941.60 SURF PJSM.CUT&SLIP DRLG LINE.DBL CUT. 06:00 - 07:30 1.50 CASING N DPRB 1,941.60 . SURF PICK UP BHA TO PULSER 07:30 - 08:00 0.50 CASING N DPRB 1,941.60 SURF UPLOAD MWD 08:00 - 09:30 1.50 CASING N DPRB 1,941.60 SURF CONT.PICK UP BHA 09:30 - 10:00 0.50 CASING N DPRB 1,941.60 SURF TIH W/4"DP TO 1,945'MD 10:00 - 11:00 1.00 CASING N DPRB 1,941.60 SURF REAM TIGHT SPOT 1,945'TO 2,070'MD -PU 100K, SO 80K,ROT 98K Q� -300 GPM,370 PSI 40 RPM 1( 11:00 - 00:00 13.00 CASING N DPRB 1,941.60 SURF DRILL NEW HOLE 2,070'TO 3,750'MD -PU 112K,SO 92K,ROT 110K -80 RPM,TQ ON 8K TQ OFF 4K -PSI 3300 ON,3190 OFF -650 GPM N 11/6/2010 00:00 - 06:30 6.50 CASING N DPRB 1,941.60 SURF DIRECTIONAL DRILL 3,750'TO 4,417'MD -PU 125K, SO 90K, ROT 105K -600 GPM,287 PSI OFF,3070 PSI ON -TQ 5K ON,7K OFF -RPM 100,WOB 30K **KICK WHILE DRILLING D2 DRILL** 06:30 - 10:30 4.00 CASING N DPRB 1,941.60 SURF BACK REAM OUT OF HOLE 4,416'TO 2,236' MD 10:30 - 11:00 0.50 CASING N DPRB 1,941.60 SURF CIRC BTMS UP WHILE ROTATING.2,236'TO 2,140'MD. -STAND BACK 1 STAND -650 GPM,2390 PSI -100RPM 11:00 - 14:00 3.00 CASING N DPRB 1,941.60 SURF POOH ON ELEVATORS FROM 2,140. -POOH TO BASE OF PERMAFROST @ 1,63'MD -RIH FROM 1,663'TO 2300-THRU TRANSITION ZONE -WORK TIGHT SPOT @ 1,935' -CONT POOH TO 900'MD 14:00 - 15:00 1.00 CASING N DPRB 1,941.60 SURF POOH W/HWDP&JARS TO 170' 15:00 - 17:30 2.50 CASING N DPRB 1,941.60 SURF LDBHA#2 -BIT GRADE 2-1-BT-N-2-1/8-WT-TD 17:30 - 18:30 1.00 CASING N DPRB 1,941.60 SURF CLEAR RIG FLOOR 18:30 - 20:30 2.00 CASING N DPRB 1,941.60 SURF LD KELLY HOSE AND CHANGE OUT SAVER SUB. INSTALL CEMENT HOSE. Printed 12/20/2010 9.02:53AM North America -ALASKA- BP Page 9 of 15 Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project:Prudhoe Bay Site: PB W Pad Rig Name/No.:DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 22:00 1.50 CASING N DPRB 1,941.60 SURF RU TESCO TOOL AND CSG SLIPS 22:00 - 00:00 2.00 CASING N DPRB 1,941.60 SURF MAKE UP SHOE TRACK&RIH W/9-5/8"CSG TO 657' 11/7/2010 00:00 - 03:00 4.00 CASING N DPRB 1,941.60 SURF RIH W 9-5/8"L-80, BTC.40 0 LBS/FT CSa.TO 1,936'MD -END OF NPT TIME 03:00 - 07:30 4.50 CASING P SURF RIH W 9-5/8"L-80,BTC,40.0 LBS/FT CSG TO 4,405'MD 07:30 - 08:30 1.00 CASING P SURF MAKE UP HANGER AND LANDING JOINT. LAND CSG @ 4,405'MD 08:30 - 11:00 2.50 CASING P SURF CIRC.AND CONDITION MUD PRIOR TO CEMENTING. -STAGE UP PUMPS TO 7.0 BPM AND 440 PSI -RECIP PIPE DURING CIRC. -PU 195K,SOW 135K 11:00 - 16:00 5.00 CEMT P SURF CM�E_N_T_Cs, :FLUSH LINES W/30 BBLS FRESH WATER, PUMP 5 BBLS 10.0 PPG MUD PUSH.PRESS. TEST CEMENT LINES TO 4,000 PSI. PUMP 95 BBLS 10.0 PPG MUD PUSH, DROP BTM PLUG. MIX AN L AD 786.5 BBLS,1933 SK,ASL,10.8 PPG,2.33 CF/SK YIELD. TAIL 84.8 BBLS,250 SK,15.8 PPG 1.17 CFT/SK YEILD. 435 BBLS SIDEWALK CEMENT TO SURFACE DROP BTM PLUG AND DISPALCE WITH 3140 STROKES TO BUMP. BUMP PLUG W/1500 PSI.HELD FOR 5 MIN. PRESS HELD. PRESSURE UP TO 3,500 PSI.HELD FOR 5 MIN.PRESS HELD. BLEED OFF PRESS AND CHECK FLOATS. FLOATS HELD CIP @ 15:20 HRS 16:00 - 20:30 4.50 CEMT P SURF BACK OUT LANDING JOINT&FLUSH.RD TESCO TOOL,AND CEMENTING EQUIPMENT. 20:30 - 00:00 3.50 BOPSUR P SURF NIPPLE DOWN DIVERTER -REMOVE FLOW LINE,BLEED OFF LINE, HOLE FILL LINE&TURNBUCKLES. -REMOVE RISER AND SET BACK DIVERTER. 11/8/2010 00:00 - 03:00 3.00 BOPSUR P SURF ND DIVERTER CLEAR CELLAR -BRING IN WELLHEAD EQUIPMENT 03:00 - 05:30 2.50 BOPSUR P SURF NU FMC SPEED HEAD&TBG SPOOL -TEST SEALS TO 1,000 PSI FOR 10 MIN. 05:30 - 15:30 10.00 BOPSUR P SURF NU BOPS -NU ADAPTER FLANGE&BOPS. -CHANGE OUT SPACER SPOOL ON CHOKE HOSE. -NU RISER,FLOW LINES,FILL LINE,BLEED OFF LINE&DOUBLE VALVE ON ANNULAR./ 15:30 - 17:30 2.00 BOPSUR P SURF CHANGE OUT TOP RAMS TO 3-1/2"X 6" t/ -CHECK ALL DOOR BOLTS 17:30 - 19:00 1.50 BOPSUR P SURF RIG UP TO TEST BOP W/4"TEST JOINT Printed 12/20/2010 9:02:53AM • North America -ALASKA- BP Page 10 of 15 Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project: Prudhoe Bay Site: PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:00 - 23:00 4.00 BOPSUR P SURF PRESSURE TEST BOP BODY. -INSTALL BODY ARMOR ON SERVICE LOOP. -GREASE MUD CROSS -NOTIFY STATE THAT BOP BODY TEST WAS COMPLETE @ 22:45 HRS. BY PAGER, WITNESS WAIVED BY JEFF JONES -SIMOPS WORK ON PNEUMATIC KOOMEY PUMP AND TOPDRIVE MOTOR 23:00 - 00:00 1.00 BOPSUR P SURF TEST BOP -ANNULAR 250 PSI LOW 2500 PSI HI WITH 4" 0;1) TEST JOINT -CHOKE VALVES AND RAMS 250 PSI LOW, 14 4,000 PSI HI WITH 4"TEST JOINT WITNESS WAIVED BY JEFF JONES 11/9/2010 00:00 - 07:00 7.00 BOPSUR P SURF TEST BOP -AOGCC REP WAIVED WITNESS ON BOP TEST(JEFFJONES) -ANNULAR 250 PSI LOW 2500 PSI HI WITH 4" TEST JOINT -CHOKE VALVES AND RAMS 250 PSI LOW, 4,000 PSI HI WITH 4"TEST JOINT SIMOPS-WORK ON TOP DRIVE 07:00 - 20:30 13.50 BOPSUR N RREP 5.60 SURF TOP DRIVE REPAIR PJSM WITH RIG CREW AND NOV REP ON LIFTING MOTOR -FINISH DISCONNECTING MOTOR ON TOP DRIVE -LIFT MOTOR OUT OF TOPDRIVE&LD -CHANGE FITTINGS TO NEW MOTOR -INSTALL NEW MOTOR -SIMOPS CHANGE OUT HCR CHOKE VALVE& TEST GAS ALARMS. 20:30 - 22:30 2.00 BOPSUR P SURF TEST BOP -TEST TOP RAMS 3-1/2"X 6",VALVE 3,HCR CHOKE,MAN CHOKE/KILL,AND BTM RAMS 2-7/8"X 5",250 PSI LOW,4,000 PSI. HI WITH 3-1/2"AND 2-7/8"TEST JOINTS. 22:30 - 00:00 1.50 BOPSUR N RREP 5.60 SURF TOP DRIVE REPAIR -CONT TO INSTALL BLOWER MOTOR -WIRE TIE BOLTS -TROUBLE SHOOT PIG TAIL -PIG TAIL FOUND TO BE DAMAGED 11/10/2010 00:00 - 02:00 2.00 CASING N RREP 5.60 SURF REPAIR TOP DRIVE -REMOVE OLD MOTOR FROM FLOOR&PREP FOR TRANSPORT. 02:00 - 03:30 1.50 CASING P SURF TEST BLIND RAMS 250 PSI LOW,4,000 PSI HIGH. 03:30 - 06:00 2.50 CASING P SURF C/O SAVER SUN,GRABBERS AND BELL GUIDE 06:00 - 08:30 2.50 CASING P SURF TEST MAN. IBOP,250 PSI LOW,4,000 PSI HIGH 08:30 - 00:00 15.50 CASING N RREP 5.60 SURF REPAIR TOP DRIVE 11/11/2010 00:00 - 05:00 5.00 CASING N RREP SURF TOP DRIVE REPAIR -CONT.TO WIRE TOP DRIVE -TEST&INSPECT ENCODER 05:00 - 06:30 1.50 BOPSUR P SURF CONT. BOP TEST -TEST TOP DRIVE IBOP 250 PSI LOW AND 4,000 PSI HIGH -RD TEST EQUIPMENT. -PULL TEST PLUG. Printed 12/20/2010 9:02:53AM North America -ALASKA- BP Page 11 of 15 Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) • Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:30 - 07:00 0.50 BOPSUR P SURF DRAIN STACK&INSTALL WEAR BUSHING. 07:00 - 09:30 2.50 CEMT P SURF PU BHA#3. 09:30 - 11:00 1.50 CEMT P SURF, UPLOAD MWD 11:00 - 13:00 2.00 CEMT P SURF SHALLOW TEST MWD -398 GPM&700 PSI -420 GPM&800 PSI REMOVE X-O BLOW DOWN TOP DRIVE 13:00 - 13:30 0.50 CEMT P SURF SERVICE RIG 13:30 - 16:30 3.00 CEMT P SURF RIH WITH 5"HWDP,4"HWDP,TO 4170'MD 16:30 - 17:30 1.00 CEMT P SURF WASH DOWN 4,170'TO 4,311'MD. -TAGGED SOLID CEMENT W/10K -PU 140K,SO 90K -424 GPM,1900 PSI **-UNANNOUNCED KICK WHILE TRIPPING DRILL** 17:30 - 19:30 2.00 CEMT P SURF PRESS TEST CSG -250 PSI LOW,FOR 5 MIN. -3,500 PSI HIGH FOR 30 MIN. -BLEED OFF TEST PRESS. -BLOW DOWN CHOKE AND KILL LINE. -RD TEST EQUIPMENT. 19:30 - 21:30 2.00 CEMT P SURF DRILL 4,311'TO 4,362' -6'CEMENT - FLOAT COLLAR - 43'OF GOOD CEMENT -PU 140K,SO 93K,RT 110K -50 RPM,WOB 3-5K 21:30 - 22:00 0.50 CEMT P SURF SUCK OUT PITS 1 &2 IN PREP.TO SWITCH OVER TO 8.8 PPG LSND MUD. 22:00 - 23:00 1.00 CEMT P SURF DISPLACE MUD SYSTEM FROM DRILL PLEX TO 8.8 LSND -450 GPM,960 PSI,60 RPM 23:00 - 23:30 0.50 CEMT P SURF DRILL CEMENT,FLOAT SHOE AND RAT HOLE TO 4,416'MD 23:30 - 00:00 0.50 DRILL P PROD1 DRII I NFW HOLE 4 417'-4 436'MD- -PU 140K,SO 93K,RT 110K. -TQ 5K,RPM 100,WOB 3-8K. 11/12/2010 00:00 - 00:30 0.50 DRILL P PROD1 CIRC&COND MUD FOR LOT 00:30 - 03:00 2.50 DRILL P PROD1 PERFORM LOT -PULL UP IN CSG WITH BIT. -FLOW CHECK WELL -RU TEST EQUIPMENT -LEAK OFF @ 660 PSI W/8.9 PPG MUD -12.6 PPG MWE -RD TEST EQUIPMENT 03:00 - 03:30 0.50 DRILL P PROD1 OBTAIN ECD BASELINE 03:30 - 00:00 20.50 DRILL P PROD1 DIRECTIONAL DRILL AHEAD 4,436'TO 5,935' MD -PU 149k,SO 110K,ROT 125K. -100 RPM,TQ ON 10K,OFF 7K -590 GPM,2750 PSI OFF,3620 PSI OFF -WOB 5-15K Printed 12/20/2010 9:02:53AM • North America -ALASKA- BP Page 12 of 15 Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project: Prudhoe Bay Site:PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/13/2010 00:00 - 14:00 14.00 DRILL PROD1 DIRECTIONAL DRILL AHEAD 5,935'TO 6,960' MD -PU 175K,SO 120K, ROT 142K -100 RPM,TQ ON 7K,TQ OFF 6K -600 GPM, PSI ON 3210, PSI OFF 2910 -WOB 20K **KICK WHILE DRILLING(D-2)DRILL CARLO CREW** **KICK WHILE DRILLING(D-2)DRILL LUSCHE CREW** 14:00 - 15:00 1.00 DRILL N DPRB 6,959.99 PROD1 CIRC.&COND MUD FOR TOH -600 GPM,2900 PSI,100 RPM. -CHECK SHOT SURVEY ON BTM. 15:00 - 19:00 4.00 DRILL N DPRB 6,959.99 PROD1 BACK REAM OUT OF HOLE 6,960'TO 5,505' MD -MW 9.1 IN,MW 9.1 OUT -REAMER AT SHOE -MONITOR WELL TO PULL OUT.WELL STATIC -PULL OUT ON ELEVATORS 5,505'TO 4,362' MD -MONITOR WELL AT THE SHOE.WELL STATIC -PUMP DRY JOB AND BLOW DOWN TOP DRIVE -CONT TO PULL OUT ON ELEVATORS 4,362' TO 963' 19:00 - 00:00 5.00 DRILL N DPRB 6,959.99 PROD1 RACK BACK NON MAG DCS, REMOVE NUKES,DOWNLOAD MWD -PJSM PRIOR TO NUKE REMOVAL 11/14/2010 00:00 - 01:00 1.00 DRILL N DPRB 6,959.99 PROD1 SERVICE FLOAT AND STAND BACK MWD 01:00 - 01:30 0.50 DRILL N DPRB 6,959.99 PROD1 RIG UP TBG TONGS AND CHANGE OUT ELEVATORS 01:30 - 02:30 1.00 DRILL N DPRB 6,959.99 PROD1 PU 3-1/2"STINGER TBG W/10 PORTED GUIDE -3.5 STINGER LENGTH 797' **UNANOUNCED KICK WHILE TRIPPING DRILL W/TBG** 02:30 - 03:00 0.50 DRILL N DPRB 6,959.99 PROD1 RD TBG TONGS AND CHANGE OUT ELEVATORS 03:00 - 03:30 0.50 DRILL N DPRB 6,959.99 PROD1 CIRC THRU TBG&STINGER. 03:30 - 06:00 2.50 DRILL N DPRB 6,959.99 PROD1 RIH W/DP AND 3.5"STINGER TO 6947 06:00 - 10:00 4.00 STKOH N DPRB 6,959.99 PROD1 CIRC&COND MUD WHILE RU SCHLUMBERGER CEMENTERS -509 GPM, PU 145K, SO 105K 10:00 - 11:00 1.00 STKOH N DPRB 6,959.99 PROD1 PUMP FIRST PLUG 6,960'TO 6,360'MD -PUMP 5.1 BBLS 11.0 PPG MUD PUSH. -PRESS TEST LINES TO 4,000 PSI. -PUMP 25 BBLS 11.0 PPG MUD PUSH. -PUMP 55.3 BBLS 15.8 PPG CLASS G CMT @ 4.5 BPM. -PUMP 3.7 BBLS 11.0 PPG MUD PUSH -DISPLACE WITH RIG PUMP(57 BBLS @ 850 PSI) -CIP @ 10:50 HRS. 11:00 - 11:30 0.50 STKOH N DPRB 6,959.99 PROD1 POOH FROM 6,947'TO 6,360'MD©2 MIN/STD 11:30 - 14:30 3.00 STKOH N DPRB 6,959.99 PROD1 CIRC&COND MUD FOR PLUG#2 -DROP WIPER BALL -600 SPM AT 1970 PSI&40 RPM CIRC OUT 10 BBLS CEMENT TO SURFACE Printed 12/20/2010 9:02:53AM North America -ALASKA- BP Page 13 of 15 Operation Summary Report Common Well Name:W-219 AFE No Event Type:DRL-ONSHORE(DON) Start Date: 10/27/2010 End Date: 11/18/2010 'X3-00VGG-C(2,518,923.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:30 - 16:00 1.50 STKOH N DPRB 6,959.99 PROD1 PUMP SECOND PLUG 6,360'TO 5,760'MD -PUMP 5.0 BBLS 11.0 PPG MUD PUSH. -PRESS TEST LINES TO 4,000 PSI. -PUMP 20 BBLS 11.0 PPG MUD PUSH. PUMP 56 BBLS 17.0 PPG CLASS G CMT @ 4.4 BPM. -PUMP 3.9 BBLS 11.0 PPG MUD PUSH DISPLACE WITH RIG PUMP(47 BBLS @ 440 PSI) -CIP @16:10 HRS. 16:00 - 16:30 0.50 STKOH N DPRB 6,959.99 PROD1 POOH FROM 6,360'TO 5,774'MD @ 2 MIN/STD 16:30 - 20:00 3.50 STKOH N DPRB 6,959.99 PROD1 CIRC&COND MUD FOR PLUG#2 -DROP WIPER BALL -547 GPM AT 1890 PSI &40 RPM -CIRC OUT 10 BBLS CEMENT TO SURFACE 20:00 - 21:30 1.50 STKOH N DPRB 6,959.99 PROD1 PUMP THIRD PLUG 5,774'TO 5,100'MD PUMP 5.0 BBLS 11.0 PPG MUD PUSH. -PRESS TEST LINES TO 4,000 PSI. -PUMP 20 BBLS 11.0 PPG MUD PUSH. -PUMP 62 BBLS 17.0 PPG CLASS G CMT @ 4.0 BPM. -PUMP 4.0 BBLS 11.0 PPG MUD PUSH -DISPLACE WITH RIG PUMP(40 BBLS @ 480 PSI) -CIP • 21:10 HRS. 21:30 - 22:00 0.50 STKOH N DPRB 6,959.99 PROD1 POOH FROM 5,774'TO 5,075'MD @ 2 MIN/STD 22:00 - 00:00 2.00 STKOH N DPRB 6,959.99 PROD1 CIRC&COND CONTAMINATED MUD -357 GPM AT 840 PSI -CIRC OUT 5 BBLS CEMENT TO SURFACE 11/15/2010 00:00 - 02:00 2.00 STKOH N DPRB 6,959.99 PROD1 CIRC&COND CONTAMENATED MUD 02:00 - 04:30 2.50 STKOH N DPRB 6,959.99 PROD1 POOH WITH CEMENT STINGER ASSEMBLY -MW IN 9.2 PPG,MW OUT 9.2 PPG -FLOW CHECK WELL.WELL STATIC -PUMP DRY JOB&BLOW DOWN TOP DRIVE 04:30 - 06:00 1.50 STKOH N DPRB 6,959.99 PROD1 CUT&SLIP DRILL LINE -INSTALL TIW -PJSM -SERVICE TOP DRIVE&BLOCKS 06:00 - 07:00 1.00 STKOH N DPRB 6,959.99 PROD1 RU STACK TONGS FOR 3.5"TBG. -C/O ELEVATORS,M/U X-OVER FOR TIW VALVE. 07:00 - 08:30 1.50 STKOH N DPRB 6,959.99 PROD1 CONT. POOH&LD 3.5"TBG&STINGER. 08:30 - 09:00 0.50 STKOH N DPRB 6,959.99 PROD1 CLEAR RIG FLOOR -REMOVE TONGS ABD ELEVATORS 09:00 - 13:00 4.00 STKOH N DPRB 6,959.99 PROD1 P/U BHA#4 -SHALLOW TEST MWD -LOAD MWD&PULSE TEST PJSM-LAOD NUKES 13:00 - 17:00 4.00 STKOH N DPRB 6,959.99 PROD1 CONT.TIH W/BHA#4 TO 4,838'MD -OBTAIN SPR BEFORE EXIT CSG SHOE **KICK WHILE TRIPPING DRILL** 17:00 - 18:00 1.00 STKOH N DPRB 6,959.99 PROD1 WASH&REAM 4,838'TO 5,058'MD -TAG TOP OF GOOD CEMENT @ 5,058'MD -PU 135K,SO 95K. -496 GPM,2380 PSI. Printed 12/20/2010 9:02:53AM • North America ALASKA- BP Page 14 of 15 Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project: Prudhoe Bay Site: PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 22:30 4.50 STKOH N DPRB 6,959.99 PROD1 DIRECTIONAL DRILL 5,058'TO 5,315'MD -PU 149K,SO 102K, -30 DEG RIGHT TOOL FACE -KICK OFF POINT @ 5,071'MD -2930 PSI OFF,2950 PSI ON,598 GPM. -TQ ON 6K,TQ OFF 5K. 22:30 - 00:00 1.50 STKOH N DPRB 6,959.99 PROD1 DISPLACE CONTAMINATED MUD W/8.8 PPG LSND. -TRACK FLUID OFF VS.FLUID ON 11/16/2010 00:00 - 01:30 1.50 STKOH N DPRB 6,959.99 PROD1 CONT.TO DISPLACE CONTAMINATED MUD WITH 8.8 PPG LSND -CLEAN PITS DURING DISPLACEMENT 01:30 - 12:00 10.50 STKOH N DPRB 6,959.99 PROD1 OBTAIN SLOW PUMP RATES WITH NEW MUD DIRECTIONALLY DRILL AHEAD FROM 5,315' TO 6,039'MD -PUW 150K,SOW 110K,ROT 126K -598 GPM,2,390 PSI OFF,2,525 PSI ON -100 RPM,TQ 6K OFF,7K ON -WOB 20K -MUD WT 8.8 PPG IN AND OUT -CALCULATED ECD 9.16 PPG,ACTUAL ECD 9.37 PPG ART 1.42,AST 4.18,ADT 5.60 SPILL DRILL 12:00 - 00:00 12.00 STKOH N DPRB 6,959.99 PROD1 DIRECTIONALLY DRILL AHEAD FROM 6.039' TO 6,837'MD -PUW 174K,SOW 115K,ROT 138K -600 GPM,2,800 PSI OFF,2,910 PSI ON -100 RPM,TQ 7K OFF,8K ON -WOB 25K -MUD WT 8.8 PPG IN AND OUT -CALCULATED ECD 9.20 PPG,ACTUAL ECD 9.58 PPG ART 3.21,AST 4.32,ADT 7.53 ADT FOR LAST 24 HRS: 13.13 HRS D2 KICK WHILE DRILLING DRILL -HELD AAR IMMEDIATELY AFTER DRILL COMPLETE 11/17/2010 00:00 - 01:30 1.50 STKOH N DPRB 6,960.00 PROD1 DIRECTIONALLY DRILL AHEAD FROM 6,837' TO 6,960'MD -PREVIOUS HOLE TD 01:30 - 04:00 2.50 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 6,960' TO 7 125'MD -PUW 185K,SOW 120K,ROT 145K -600 GPM,3,080 PSI OFF,3,160 PSI ON, -100 RPM,TQ 7.5K OFF,8K ON -25K WOB -MUD WT 9.0 PPG IN AND OUT ART 2.06,AST 0.00,ADT 2.06 04:00 - 05:00 1.00 DRILL P PROD1 CIRCULATE BOTTOMS UP -603 GPM,3,020PSI -100 RPM,7K TQ -9.0 PPG MUD WT IN AND OUT 05:00 - 06:00 1.00 DRILL P PROD1 BACKREAM FROM 7,087'TO 6,690'MD -600 GPM,3,040 PSI -100 RPM,7K TQ -9.0 PPG MUD WT IN AND OUT Printed 12/20/2010 9:02:53AM North America-ALASKA- BP Page 15 of 15 Operation Summary Report Common Well Name:W-219 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 10/27/2010 End Date: 11/18/2010 X3-00VGG-C(2,518,923.00) Project: Prudhoe Bay Site:PB W Pad Rig Name/No.:DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:W-219 Actual©86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 09:00 3.00 EVAL P PROD1 MAD PASS FROM 6,690'TO 6,210'MD -180 FT/HR -580 GPM,2,880 PSI -70 RPM,TQ 7K 9.1 PPG MUD WT IN AND OUT 09:00 - 12:00 3.00 DRILL P PROD1 BACKREAM FROM 6,210'TO 4,361'MD -580 GPM,2,880 PSI -100 RPM,TQ 7K -9.1 PPG MUD WT IN AND OUT 12:00 - 12:30 0.50 DRILL P PROD1 CIRCULATE AND CONDITION MUD AT 4,361' MD -500 GPM,1,820 PSI -PUW 125K,SOW 98K 12:30 - 00:00 11.50 DRILL N WAIT 4,361.00 PROD1 BLOW DOWN TOP DRIVE INSTALL FLOOR VALVE LINE UP TO MONITOR WELL VIA TRIP TANK WAIT ON WEATHER -PHASE 3 WEATHER CONDITIONS WEST OF KUPARUK RIVER BRIDGE 11/18/2010 00:00 - 06:30 6.50 DRILL N WAIT 4,361.00 PROD1 CONTINUE TO WAIT ON WEATHER -CREWS PERFORMING MAINTENANCE CHECKS 06:30 - 08:00 1.50 DRILL P PROD1 PHASE 3 LIFTED RIH FROM 4,361'TO 7,027'MD -9.4 PPG MUD WT IN AND OUT 08:00 - 08:30 0.50 DRILL P PROD1 WASH DOWN FROM 7,027'TO 7,125'MD PICK UP SINGLE FROM PIPE SHED DRILL FROM 7,125'TO 7,128'MD AND CALL TD -PUW 185K,SOW 120K,ROT 145K -590 GPM,3,380 PSI OFF,3,450 PSI ON -100 RPM,6.5K TQ OFF,7K TQ ON 08:30 - 11:00 2.50 DRILL P PROD1 CIRCULATE AND CONDITION HOLE -PUW 185K,SOW 120K,ROT 145K -580 GPM,3,380 PSI -100 RPM,TQ 7K -9.1 PPG MUD WT IN AND OUT 11:00 - 12:00 1.00 DRILL P PROD1 FLOW CHECK WELL -NO FLOW POOH FROM 7,128'TO 6,648'MD -9.1 PPG MUD WT IN AND OUT 12:00 - 16:30 4.50 DRILL P PROD1 POOH FROM 6,648'TO 201'MD -RACK BACK 4"HWDP -LAY DOWN 5"HWDP AND JARS -9.1 PPG MUD WT IN AND OUT 16:30 - 18:30 2.00 DRILL P PROD1 LAY DOWN 2 NON-MAG FLEX COLLARS HOLD PJSM WITH RIG CREW AND SPERRY PERSONNEL REMOVE RADIOACTIVE SOURCES FROM BHA DOWNLOAD MWD 18:30 - 20:00 1.50 DRILL P PROD1 LAY DOWN REMAINING BHA -GHOST REAMER 1/16"UNDERGAGE -BIT GRADE 1-2-CT-M-E-4-ER-TD 20:00 - 21:00 1.00 DRILL P PROD1 CLEAN AND CLEAR RIG FLOOR MOBILIZE EQUIPMENT FOR UPCOMING OPERATIONS END DON EVENT Printed 12/20/2010 9:02:53AM North America -ALASKA- BP Page 1 of 10 Operation Summary Report Common Well Name:W-219 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/19/2010 End Date X3-00VGG-C(2,301,974.00) Project: Prudhoe Bay Site: PB W Pad Rig Name/No.:DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/18/2010 21:00 - 21:30 0.50 WHSUR P ■ RUNPRD PULL WEAR RING PICK UP 7"TEST JOINT AND INSTALL TEST PLUG 21:30 - 23:00 1.50 BOPSUR P -_ RUNPRD CHANGE UPPER RAMS FROM 3-1/2"X 6"VBR TO 7"FIXED 23:00 - 00:00 1.00 BOPSUR P RUNPRD RIG UP TESTING EQUIPMENT TEST 7"RAMS TO 250 PSI LOW/4,000 PSI W'P HIGH PER AOGCC/BP REGULATIONS -5 MINUTES EACH TEST 45 -TEST CHARTED -TEST WITNESSED BY DOYON TP HARRY GOOCHENAUER AND BP WSL FRANK ROACH -AOGCC INSPECTOR LOU GRIMALDI WAIVED WITNESS 11/19/2010 00:00 - 03:00 3.00 CASING P RUNPRD RIG UP TO RUN 7"PRODUCTION CASING 03:00 - 04:30 1.50 CASING P RUNPRD HOLD PJSM WITH CREW AND DOYON CASING REP MAKE UP SHOETRACK -BAKERLOK SHOETRACK CONNECTIONS MAKE UP CROSSOVER JOINT FILL PIPE WITH FRANKS TOOL AND CIRCULATE 30 BBLS 6 BPM,260 PSI PICK UP AND CHECK FLOATS -FLOATS HOLDING 04:30 - 16:30 12.00 CASING P RUNPRD RUN 7",26#, L-80,TC-II/VAM TOP HC PRODUCTION CASING FROM 168'TO 4,403' MD -2 CENTRALIZERS PER JOINT FOR FIRST 38 JOINTS -FILL PIPE EVERY JOINT -TORQUE TURN CONNECTIONS -9.2 PPG MUD WT IN AND OUT 5 TC-II JOINTS REJECTED DUE TO GALLED THREADS 16:30 - 17:30 1.00 CASING P RUNPRD BREAK CIRCULATION AT SHOE AND STAGE UP PUMPS -START AT 2 BPM,300 PSI -FINISH AT 8.5 BPM,720 PSI 17:30 - 23:00 5.50 CASING P RUNPRD CONTINUE TO RUN 7",26#, L-80,VAM TOP HC PRODUCTION CASING FROM 4,403'TO 7,115' MD -FILL PIPE EVERY JOINT -BREAK CIRCULATION EVERY 10 JOINTS -NOTE PICK UP,SLACK OFF WEIGHTS EVERY 10 JOINTS -TORQUE TURN CONNECTIONS -9.2 PPG MUD WT IN AND OUT 23:00 - 00:00 1.00 CASING P RUNPRD PICK UP AND MAKE UP LANDING JOINT/CASING HANGER TO CASING STRING LAND HANGER IN WELLHEAD MAKE UP CEMENT HEAD TO LANDING JOINT Printed 12/20/2010 9:02:41AM North America -ALASKA- BP Page 2 of 10 Operation Summary Report Common Well Name:W-219 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00VGG-C(2,301,974.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:W-219 Actual©86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/20/2010 00:00 - 02:30 2.50 CEMT P RUNPRD STAGE UP PUMPS TO 5 BPM,390 PSI CIRCULATE 3 BOTTOMS-UP VOLUMES PUW 235K,SOW 135K HOLD PJSM FOR CEMENT JOB AFTER SECOND BOTTOMS UP Printed 12/20/2010 9:02:41AM North America -ALASKA- BP Page 3 of 10 Operation Summary Report Common Well Name:W-219 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00VGG-C(2,301,974.00) Project: Prudhoe Bay Site: PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:30 - 04:30 2.00 CEMT P RUNPRD CEMENT 7"PRODUCTION CASING WITH .A RECIPROCATION AS FOLLOWS: G " 01:30 HOLD PRE-JOB SAFETY MEETING WITH 1��h RIG CREW,SCHLUMBERGER CEMENT CREW / AND CH2M HILL TRUCK DRIVERS 01:50 START BATCH MIXING 15.8 PPG G CEMENT 02:20 CEMENT TO WEIGHT 02:20 STOP CIRCULATING.LINE UP SLB CEMENTERS TO WELL 02:25 PUMP 5 BBLS TO FLOOD CEMENT LINES TO CEMENT HEAD 02:28 TEST LINES TO 4,200 PSI-GOOD 02:37 PUMP 30 BBL 11.0 PPG MUD PUSH II AT 4.7 BPM,507 PSI 02:49 DROP BOTTOM PLUG.FLAG INDICATED PLUG DROPPED 02:50 PUMP 63 BBL 15.8 PPG TAIL CEMENT WITH GASBLOK AWAY AT 5.9 BPM -15.8 PPG CLASS G WITH GASBLOK -5.9 BPM,770 PSI TREATING PRESSURE 03:01 STOP PUMPING CEMENT 03:06 DROP TOP PLUG 03:07 BEGIN DISPLACEMENT WITH RIG PUMP DISPLACE WITH 9.2 PPG BRINE -PUMP 7 BPM TO CATCH UP TO CEMENT 03:15 CATCH UP TO CEMENT. DROP RATE TO 5 BPM,70 PSI -CEMENT FALLING AWAY AGAIN 03:39 PARK HANGER IN WELLHEAD BOWL AS MUD PUSH SPACER ROUNDS SHOE -RESUME RECIPROCATION 50 STKS AFTER MUD PUSH ROUNDS SHOE 03:45 PARK HANGER IN WELLHEAD BOWL AS CEMENT ROUNDS SHOE -RESUME RECIPROCATION 50 STKS AFTER CEMENT ROUNDS SHOE -CATCH UP TO CEMENT AS RECIPROCATION RESUMES 03:55 SLOW PUMP RATE TO 2 BPM AT 2,600 STROKES. 03:58 PLUG BUMP AT 2,650 STROKES(268 BBL DISPLACED); -CALCULATED DISPLACEMENT WAS 269 BBLS BUMPED PLUG WITH 2,000 PSI PRESSURE -HELD PRESSURE FOR 5 MINUTES BLEED OFF PRESSURE AND CHECK FLOATS -FLOATS HOLDING / FULL RETURNS THROUGHOUT JOB WHILE ✓ RECIPROCATING LINER WITH 15'STROKES CEMENT IN PLACE AT 03:58 -UCA TEST SHOWS COMPRESSIVE STRENGTH AFTER 11.5 HRS AT 500PSI -THICKENING TIME TO 70 BC @ 90 DEG=4 HRS 28 MIN CEMENT JOB VOLUME: 63 BBLS 15.8 PPG CLASS G TAIL;302 SACKS AT 1.17 CUFT/SK Printed 12/20/2010 9:02:41AM North America -ALASKA- BP Page 4 of 10 Operation Summary Report Common Well Name:W-219 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00VGG-C(2,301,974.00) Project: Prudhoe Bay Site: PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual©86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 05:30 1.00 CEMT P RUNPRD RIG UP AND TEST 7"CASING TO 4,000 PSI FOR 30 MINUTES -TEST CHARTED -GOOD TEST 05:30 - 06:30 1.00 CEMT P RUNPRD RIG DOWN CEMENT EQUIPMENT LAY DOWN LANDING JOINT CLEAN AND CLEAR RIG FLOOR FLUSH AND DRAIN BOP STACK 06:30 - 09:00 2.50 WHSUR P RUNPRD INSTALL 7"MANDREL PACKOFF PER FMC WELLHEAD TECHNICIAN AND RILDS PRESSURE TEST PACKOFF VOID TO 5,000 PSI FOR 30 MINUTES -GOOD TEST -TEST CHARTED 09:00 - 09:30 0.50 WHSUR P RUNPRD BULLHEAD 3 BBLS DOWN 7"X 9-5/8" ANNULUS -3 BPM,1,200 PSI PUMP 2 BBL EVERY HOUR UNTIL CEMENT REACHES 500 PSI COMPRESSIVE STRENGTH -2 BPM,950 PSI 09:30 - 12:00 2.50 BOPSUR P RUNPRD CHANGE OUT 7"FIXED RAMS TO 3-1/2"X 6" VBR SIMOPS:LAY DOWN CASING RUNNING EQUIPMNENT AND CLEAR RIG FLOOR 12:00 - 14:00 2.00 BOPSUR P RUNPRD RIG UP AND TEST 3-1/2"X 6"VARIABLE BORE RAMS D -TEST TO 250 PSI LOW,4,000 PSI HIGH -5 MINUTES EACH TEST -CHART TEST -TEST WITH 3-1/2"AND 4"TEST JOINTS SIMOPS AT 12:30 AND 13:30:CONFIRM 7"X 9-5/8"ANNULUS IS OPEN -BULLHEAD 2 BBL 9.2 PPG MUD DOWN ANNULUS -1 BPM,950 PSI 14:00 - 14:30 0.50 BOPSUR P RUNPRD RIG DOWN TEST EQUIPMENT INSTALL WEAR RING IN WELLHEAD 14:30 - 15:00 0.50 PERFOB P OTHCMP MOBILIZE MWD TOOLS TO RIG FLOOR FOR TCP RUN SIMOPS AT 14:30:CLEAR 7"X 9-5/8"ANNULUS -BULLHEAD 105 BBL 9.2 PPG FLO PRO MUD -3 BPM,1,200 PSI INITIAL,1,000 PSI FINAL 15:00 - 18:00 3.00 PERFOB P OTHCMP MAKE UP MWD TOOLS UPLOAD TO TOOLS ON RIG FLOOR ATTEMPT TO PULSE TEST TOOLS BELOW ROTARY TABLE -290 GPM,330 PSI -PUMP PRESSURE TOO LOW TO DETECT TOOL SIGNAL STAND BACK MWD IN DERRICK SIMOPS AT 17:00:FREEZE PROTECT 7"X 9-5/8"ANNULUS WITH LITTLE RED HOT OIL SERVICES -70 BBL DEAD CRUDE -2 BPM,1,100 PSI 18:00 - 19:00 1.00 PERFOB P OTHCMP RIG UP TO RUN PERF GUNS Printed 12/20/2010 9:02:41AM North America -ALASKA BP Page 5 of 10 Operation Summary Report Common Well Name:W-219 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00VGG-C(2,301,974.00) Project: Prudhoe Bay Site: PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual©86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:00 - 20:00 1.00 PERFOB P OTHCMP MAKE UP PERF GUNS WITH SCHLUMBERGER TCP TECHNICIANS ON RIG FLOOR -GUN LENGTH 231.24' -TOTAL LENGTH WITH BULLNOSE BOTOTM, FIRING HEAD,AND CROSSOVER:245.04' MAKE UP MWD ASSEMBLY TO 291'MD 20:00 - 22:30 2.50 PERFOB P OTHCMP RIH WITH PERF GUNS ON 4"DRILLPIPE FROM 291'TO 3,700'MD -9.2 BRINE IN CASED HOLE -PROPER PIPE DISPLACEMENT DURING TRIP IN _D1 KICK WHILE TRIPPING DRILL 22:30 - 23:00 0.50 PERFOB P OTHCMP LUBRICATE AND SERVICE RIG 23:00 - 00:00 1.00 PERFOB P OTHCMP RIH WITH PERF GUN ASSEMBLY FROM 3,700' TO 4,648'MD -9.2 PPG BRINE IN CASED HOLE -PROPER PIPE DISPLACEMENT DURING TRIP IN 11/21/2010 00:00 - 00:30 0.50 PERFOB OTHCMP SERVICE DRAW WORKS 00:30 - 01:00 0.50 PERFOB OTHCMP TEST MWD AT 4,648'MD -300 GPM,800 PSI -UNABLE TO DETECT TOOL AT SURFACE DECREASE PULSATION DAMPNER ON#1 AND#2 MUD PUMPS FROM 1,000 PSI TO 800 PSI TEST MWD AGAIN -290 GPM,780 PSI,ABLE TO DETECT MWD TOOL -320 GPM,1,050 PSI, GOOD DETECTION 01:00 - 02:00 1.00 PERFOB OTHCMP RIH WITH PERF GUN ASSEMBLY FROM 4,640' TO 7,029'MD -9.2 PPG BRINE IN CASED HOLE -PROPER PIPE DISPLACEMENT DURING TRIP IN TAG PBTD 1'IN ON STAND 65 02:00 - 07:30 5.50 PERFOB OTHCMP LOG UP AND CORRELATE MWD WITH DRILLING GR -300 GPM,1,110 PSI -300 FT/HR PULLING SPEED RUN 3 PASSES TO CONFIRM CORRELATION -LOGGED UP TO FIRING DEPTH ON FINAL PASS 07:30 - 09:00 1.50 PERFOB OTHCMP HOLD PJSM WITH RIG CREW AND SCHLUMBERGER TCP CREW OPEN KILL HCR AND FLOOD KILL LINE CLOSE ANNULAR PREVENTOR LINE UP TO PRESSURE UP DOWN BOTH DRILLPIPE AND ANNULUS THROUGH KILL LINE PERFORM PRACTICE RUN ON PRESSURE-UP/BLEED OFF TIMES INITIATE FIRING SEQUENCE -GUNS DID NOT FIRE WAIT 15 MINUTES LINE BACK UP AND INITIATE FIRING SEQUENCE -GUNS FIRED SUCCESSFULLY -4 BBL INITAL LOSS 109:00 - 09:30 0.50 PERFOB OTHCMP POOH FROM 6,841'TO 6,551'MD Printed 12/20/2010 9:02:41AM • North America ALASKA- BP Page 6 of 10 Operation Summary Report Common Well Name:W-219 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: 'X3-00VGG-C(2,301,974.00) Project:Prudhoe Bay Site: PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual©86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:30 10:30 1.00 PERFOB ■■ OTHCMP CIRCULATE ONE BOTTOMS UP -227 GPM,930 PSI -9.2 PPG BRINE AN AND OUT 10:30 - 12:00 1.50 PERFOB OTHCMP POOH FROM 6,551'TO 5,220'MD, LAYING DOWN DRILLPIPE SINGLES -LOSING FLUID TO FORMATION AT 1 BBUHR D1 KICK WHILE TRIPPING DRILL 12:00 - 12:30 0.50 PERFOB ■■ OTHCMP SERVICE RIG MONITOR WELL FOR STATIC LOSS RATE -1 BBUHR LOSS RATE 12:30 - 18:00 5.50 PERFOB OTHCMP POOH FROM 5,220'TO 291'MD, LAYING ■■- DOWN DRILLPIPE SINGLES AND D LOSING FLUID TO FORMATION AT HWDP 18:00 - 19:30 1.50 PERFOB OTHCMP DOWNLOAD MWD MAKE UP TIW VALVE TO SINGLE JOINT OF DRILLPIPE FOR WELL CONTROL WHILE LAYING DOWN PERF GUNS LAY DOWN MWD TOOLS 19:30 - 21:30 2.00 PERFOB -- _OTHCMP LAY DOWN PERF GUNS -ALL GUNS FIRED 21:30 - 22:00 0.50 PERFOB OTHCMP CLEAN AND CLEAR RIG FLOOR 22:00 - 22:30 0.50. EVAL OTHCMP RIG UP SCHLUMBERGER E-LINE FOR GAUGE RING/JUNK BASKET AND USIT RUNS HOLD PJSM WITH RIG CREW AND SCHLUMBERGER E-LINE CREW 22:30 - 00:00 1.50 EVAL OTHCMP MAKE UP AND RIH WITH 6.05"OD GAUGE RING/JUNK BASKET AND GR/CCL ON E-LINE TOTAL FLUID LOST OVER 24 HOURS: 14 BBLS 11/22/2010 00:00 - 01:30 1.50 EVAL P OTHCMP RIH WITH 6.05"OD GAUGE RING/JUNK BASKET AND GR/CCL ON E-LINE TAG PBTD AT 7,020'ELM POOH TO SURFACE AND EMPTY JUNK BASKET -1QT DEBRIS RECOVERED FROM JUNK BASKET -NO METAL RECOVERED 01:30 - 04:00 2.50 EVAL P OTHCMP CHANGE GAUGE RING FROM 6.05"OD TO 6.13"OD RIH WITH 6.13"OD GAUGE RING/JUNK BASKET AND GR/CCL ON E-LINE STACK WEIGHT AT 6,739'ELM ABLE TO WORK TOOLS FREE WITH 600 LBS OVERPULL ATTEMPT TO WORK TOOLS THROUGH WITH NO SUCCESS -FINAL ATTEMPT TOOK 1,500 LBS OVERPULL TO WORK TOOLS FREE POOH AND INSPECT TOOLS -300 LB OVERPULL OBSERVED AS GAUGE RING PASSED THROUGH CONNECTIONS -NO DEBRIS RECOVERED FROM JUNK BASKET -SMALL 1"LONG X 1/8"WIDE MARKS OBSERVED ON GAUGE RING Printed 12/20/2010 9:02:41AM North America -ALASKA- BP Page 7 of 10 Operation Summary Report Common Well Name:W-219 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00VGG-C(2,301,974.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr ft 04:00 - 06:00 2.00 EVAL P OTHCMP CONSULT WITH ODE CHANGE OUT 6.13"OD GAUGE RING BACK TO 6.05"OD RIH WITH 6.05"OD GAUGE RING/JUNK BASKET AND GR/CCL ON E-LINE TAG PBTD AT 7,025'ELM POOH WITH GAUGE RING ASSEMBLY NO DEBRIS RECOVERED FROM JUNK BASKET 06:00 - 06:30 0.50 EVAL P OTHCMP LAY DOWN GAUGE RING/JUNK BASKET ■ PICKUP AND MAKE UP USIT,GPIT,GR,CCL TO LOG 7"CASING AND PERFORATIONS 06:30 - 11:00 4.50 EVAL P OTHCMP RIH WITH USIT TOOLSTRING TO 7,005'ELI'1 /S LOG MAIN PASS FROM 7,005'TO 56'ELM Vl LOG REPEAT PASS FROM 7,005'TO 5,854' ELM c g� FIRE DRILL 11:00 - 11:30 0.50 EVAL P OTHCMP LAY DOWN USIT TOOLSTRING RIG DOWN SCHLUMBERGER E-LINE 11:30 - 12:00 0.50 WHSUR P OTHCMP PULL WEAR RING FOR UPCOMING COMPLETION RUN 12:00 - 12:30 0.50 WHSUR ` P OTHCMP INSPECT DERRICK FOR ICE BUILDUP ■ CLEAR RIG FLOOR AND REMOVE ICE FROM DERRICK 12:30 - 17:30 5.00 RUNCOM P RUNCMP RIG UP TO RUN COMPLETION PICK UP LANDING JOINT AND MAKE DUMMY RUN WITH TUBING HANGER RIG UP SCHLUMBERGER I-WIRE RIG UP DOYON CASING TORQUE TURN EQUIPMENT 17:30 - 19:00 1.50 RUNCOM P RUNCMP MAKE UP AND RIH WITH 3-1/2",9.2#,L-80, TC-II COMPLETION RUN TO FIRST PRESSURE GAUGE/ PASS-THROUGH PACKER 19:00 - 21:00 2.00 RUNCOM P RUNCMP INSTALL I-WIRE IN NDPG MANDREL#1 RUN THROUGH HALLIBURTON MFA PACKER #1 SPILL DRILL 21:00 21:30 0.50 RUNCOM P ■- RUNCMP P WITH COMPLETION TO SECOND PRESSURE GAUGE/PASS-THROUGH PACKER 21:30 - 23:30 2.00 RUNCOM P ■- RUNCMP INSTALL I-WIRE IN NDPG MANDREL 2 PACKER THROUGH HALLIBURTON MFA PACKER #2 23:30 - 00:00 0.50 RUNCOM P RUNCMP RIH WITH 3-1/2"COMPLETION TO THIRD PRESSURE GAUGE/PASS-THROUGH PACKER TOTAL FLUID LOST TODAY:13 BBLS TOTAL FLUID LOST SINCE PERFORATING:27 BBLS 11/23/2010 00:00 - 02:00 2.00 RUNCOM P - RUNCMP INSTALL I-WIRE IN NDPG MANDREL#3 RUN THROUGH BAKER PREMIER PACKER#3 Printed 12/20/2010 9.02:41AM • North America -ALASKA- BP Page 8 of 10 Operation Summary Report Common Well Name:W-219 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00VGG-C(2,301,974.00) Project: Prudhoe Bay Site: PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 17:00 15.00 RUNCOM P RUNCMP RIH WITH 3-1/2",9.2#, L-80,TC-II COMPLETION WITH I-WIRE TO 6,901' -TORQUE TURN ALL CONNECTIONS -CHECK I-WIRE CONNECTIVITY EVERY 1,000' -LAY DOWN JT 141 DUE TO BAD CONNECTION. REPLACE COUPLING ON JT 140 AND REPLACE BAD JOINT WITH 29.93' SPARE JOINT -PICK UP JT 215 AND SPACE COMPLETION OUT WITH WLEG AT 6,901'MD D1 KICK WHILE TRIPPING DRILL SPILL DRILL 17:00 - 21:00 4.00 RUNCOM P RUNCMP RIG UP SCHLUMBERGER E-LINE -MAKE UP PUMP-IN-SUB AND PACKOFF -TEST PACKOFF TO 1,000 PSI 21:00 - 22:30 1.50 RUNCOM P RUNCMP RIH WITH GR/CCL TO RHC PLUG IN XN NIPPLE LOG TO SURFACE FOR COMPLETION SPACEOUT 22:30 - 23:30 1.00 RUNCOM P RUNCMP LAY DOWN GR/CCL LOGGING TOOLS RIG DOWN SCHLUMBERGER E-LINE 23:30 - 00:00 0.50 RUNCOM P RUNCMP LAY DOWN JTS 215 AND 214 -LEAVE JT 214 ON PIPE SKATE PICK UP 4.83'SPACEOUT PUP AND RIH. RIH WITH JT 214 PICK UP AND MAKE UP TUBING HANGER ASSEMBLY TO COMPLETION STRING TOTAL FLUID LOST TODAY: 12 BBLS TOTAL FLUID LOST SINCE PERFORATING:39 BBLS 11/24/2010 00:00 - 02:00 2.00 RUNCOM P RUNCMP CHANGE ELEVATORS FROM 3-1/2"TO 4-1/2" FOR LANDING JT PICK UP AND MAKE UP TUBING HANGER ASSEMBLY SCHLUMBERGER/FMC TERMINATE I-WIRE IN TUBING HANGER TEST I-WIRE CONNECTION THROUGH TUBING HANGER TO 5,000 PSI FOR 5 MINUTES -GOOD TEST. LAND TUBING HANGER IN WELLHEAD -PUW 107K,SOW 86K -113 CANNON CLAMPS,17 HALF CLAMPS, AND 243 PINS USED TO HOLD I-WIRE 02:00 - 02:30 0.50 RUNCOM P RUNCMP FMC TECH RILDS -TORQUE LDS TO 480 FT-LBS DROP BALL AND ROD BACK OUT AND LD LANDING JOINT 02:30 - 03:00 0.50 RUNCOM P RUNCMP RIG UP TO SET PACKERS AND PRESSURE TEST TUBING AND IA L -LINE UP ON ANNULUS VALVE TO TEST IA -FLOOD CHOKE MANIFOLD, BOP STACK, AND KILL LINE TO TEST TUBING Printed 12/20/2010 9:02:41AM North America -ALASKA- BP Page 9 of 10 Operation Summary Report Common Well Name:W-219 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00VGG-C(2,301,974.00) Project: Prudhoe Bay Site: PB W Pad Rig Name/No.: DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 03:30 0.50 RUNCOM P RUNCMP PRESSURE UP ON TUBING TO 4.500 PSI TO SET BAKER PREMIER AND HALLIBURTON MFA PACKERS -NKtssurtt ur WITH MUD PUMPS TO 4,000 PSI -USE TEST PUMP TO FINISH PRESSURE UP TO 4,500 PSI 03:30 - 05:30 2.00 RUNCOM P RUNCMP BLEED PRESSURE ON TUBING TO 4,000 PSI AND RUN FOR 30 MINUTES TO TEST TUBING -LOST 60 PSI IN FIRST 15 MINUTES -LOST 30 PSI IN SECOND 15 MINUTES -PRESSURE TEST PASSED BLEED TUBING PRESSURE DOWN TO 2,500 PSI PRESSURE UP ON 7"X3-1/2"ANNULUS TO 500 PSI LOW FOR 5 MINUTES INCREASE PRESSURF To 4r00o Psi ANn . GS HQI n FC1R 3n MINI JTFS. -LOST 50 PSI IN FIRST 15 MINUTES -LOST 10 PSI IN SECOND 15 MINUTES -PRESSURE TEST PASSED AOGCC INSPECTOR JOHN CRISP WAIVED WITNESS OF TUBING AND ANNULUS TESTS 05:30 - 06:00 0.50 RUNCOM P RUNCMP BLEED OFF PRESSURE ON TUBING TO SHEAR DCR VALVE -DCR SHEARED AT 2,000 PSI LINE UP AND CIRCULATE TO CONFIRM DCR FULLY SHEARED -PUMP DOWN TUBING 3 BPM,300 PSI -PUMP DOWN IA 3 BPM,540 PSI 06:00 - 07:00 1.00 WHSUR P RUNCMP RIG UP AND SET TWC IN WELLHEAD ON T-BAR LINE UP AND PRESSURE TEST TWC FROM / BELOW -250 PSI LOW,1,000 PSI HIGH -5 MINUTES EACH TEST LINE UP AND TEST TWC FROM ABOVE -250 PSI LOW,4,000 PSI HIGH -5 MINUTES EACH TEST RIG DOWN TEST EQUIPMENT 07:00 - 10:00 3.00 BOPSUR P RUNCMP BLOW DOWN CHOKE AND KILL LINES, INJECTION LINE,AND CHOKE MANIFOLD DRAIN BOP STACK PULL MOUSEHOLE NIPPLE DOWN BOP STACK AND CHOKE LINE -SET STACK BACK ON STUMP SIMPOS WHILE DRAINING BOP STACK: RIG DOWN I-WIRE SPOOL AND REMOVE FROM RIG FLOOR 10:00 - 14:00 4.00 WHSUR P RUNCMP NIPPLE UP TUBING HEAD ADAPTER FLANGE RIG UP AND TEST FLANGE CONNECTION -250 PSI LOW,5,000 PSI HIGH -<100 PSI PRESSURE LOSS IN 15 MIN HIGH TEST 14:00 - 16:30 2.50 WHSUR P RUNCMP NIPPLE UP TREE RIG UP AND TEST TREE -250 PSI LOW,5,000 PSI HIGH -<50 PSI PRESSURE LOSS IN 15 MIN HIGH TEST Printed 12/20/2010 9:02:41AM North America -ALASKA- BP Page 10 of 10 Operation Summary Report Common Well Name:W-219 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/19/2010 End Date: X3-00VGG-C(2,301,974.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:DOYON 14 Spud Date/Time: 10/31/2010 12:00:00AM Rig Release: 11/25/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:W-219 Actual @86.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ft 16:30 - 19:00 2.50 WHSUR P RUNCMP RIG UP DSM LUBRICATOR AND TEST -300 PSI LOW,3,500 PSI HIGH -5 MINUTES EACH TEST PULL TWC FROM WELLHEAD RIG DOWN DSM LUBRICATOR 19:00 - 22:00 3.00 WHSUR P RUNCMP REVERSE CIRCULATE COMPLETION FLUID DOWN 7"X 3-1/2"ANNULUS AND UP 3-1/2" TUBING -PUMP 182 BBLS 9.2 PPG BRINE FOLLOWED BY 115 BBL 9.2 PPG BRINE WITH 0.48 GAL/BBL EC-1124A CORROSION INHIBITOR -3 BPM,450 PSI 22:00 - 22:30 0.50 WHSUR P - RUNCMP RIG UP LITTLE RED HOT OIL SERVICES TO PUMP FREEZE PROTECT 7"X 3-1/2"ANNULUS 22:30 - 23:30 1.00 WHSUR P RUNCMP PRESSURE TEST LRHOS LINES TO 3,000 PSI PUMP 85 BBLS DIESEL FREEZE PROTECT DOWN 7"-X 3-1/2"ANNULUS -2 BPM,600 PSI 23:30 - 00:00 0.50 WHSUR P RUNCMP RIG UP JUMPER FROM TUBING TO IA SIDE OUTLET VALVE ALLOW DIESEL FREEZE PROTECT TO U-TUBE 11/25/2010 00:00 - 01:00 1.00 WHSUR P RUNCMP CONTINUE ALLOWING DIESEL TO U-TUBE BETWEEN TUBING AND 7"X 3-1/2"ANNULUS RIG DOWN JUMPER 01:00 - 03:00 2.00 WHSUR P RUNCMP RIG UP DSM LUBRICATOR TO TREE AND TEST -300 PSI LOW,3,500 PSI HIGH -5 MINUTES EACH TEST 03:00 - 04:00 1.00 WHSUR P RUNCMP INSTALL BPV IN TUBING HANGER PRESSURE TEST BPV FROM BELOW -250 PSI LOW,1,000 PSI HIGH -5 MINUTES EACH TEST INSTALL VR PLUG IN 7"X 3-1/2"ANNULUS VALVE 04:00 - 06:00 2.00 RIGD P RUNCMP RIG DOWN DSM LUBRICATOR INSTALL SWAB CAP ON TREE SECURE WELL Printed 12/20/2010 9:02:40AM W-219, Well History Date Summary 11/25/10 T/1/O=0/0/0 Pulled 4" CIW TWC#258; Set 4" CIW BPV#709 @ 96"w/1-2'ext.; Set 2"V/R plugs in I/A tubing spools; Doyon 14 R/D-M/O Page 1 of 1 North America - ALASKA - BP Prudhoe Bay PB W Pad W-219 W-219 Design: W-219 Survey Report - Geographic 19 November, 2010 • Survey Report-Geographic Company: North America-ALASKA-BP Local Co=ordinate Reference: Well W-219 Project: Prudhoe Bay TVD Reference: W-219 Actual©86.90ft(Doyon 14) Site: PB W Pad MD Reference: W-219 Actual @ 86.90ft(Doyon 14) Well: W-219 North Reference: True Wellbore: W-219 Survey Calculation!Method: Minimum Curvature Design: W-219 Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB, PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB W Pad,TR-11-12 Site Position: Northing: 5,957,194.18ft Latitude: 70°17'31.506 N From: Map Easting: 609,919.18ft Longitude: 149°6'36.343 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 0.84 ° Well W-219 API No 50029234290000 Well Position +N/-S 0.00 ft Northing: 5,959,787.60 ft Latitude: 70°17'56.703 N +E/-W 0.00 ft Easting: 612,048.95 ft Longitude: 149°5'33.152 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 52.10 ft 1 Wellbore W-219 API No 50029234290000 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGGM2009 10/26/2010 21.78 80.90 57,692 Design W-219 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 4,982.83 Vertical Section: Depth From(ND) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 34.80 0.00 0.00 74.61 Survey Program Date: 11/19/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 79.00 722.00 Gyro Survey(W-219PB1) GYD-GC-SS Gyrodata gyro single shots 762.56 1,897.17 MWD Run 100(W-219PB1) MWD+IFR+MS MWD+IFR+Multi Station 1,940.00 4,370.30 MWD Run 200(W-219PB2) MWD+IFR+MS MWD+IFR+Multi Station 4,416.40 4,982.83 MWD Run 300(W-219PB2) MWD+IFR+MS MWD+IFR+Multi Station 5,071.00 7,082.70 MWD Run 400(W-219) MWD+IFR+MS MWD+IFR+Multi Station 11/19/2010 8:39:48AM Page 2 COMPASS 2003.16 Build 73 Survey Report- Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well W-219 Project: Prudhoe Bay TVD Reference: W-219 Actual @ 86.90ft(Doyon 14) Site: PB W Pad MD Reference: W-219 Actual @ 86.90ft(Doyon 14) Well: W-219 North Reference: True Wellbore: W-219 Survey Calculation Method: Minimum Curvature Design: W-219 Database: EDM .16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/.S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 34.80 0.00 0.00 34.80 0.00 0.00 5,959,787.60 612,048.95 70° 17'56.703 N 149°5'33.152 W 79.00 0.21 97.27 79.00 -0.01 0.08 5,959,787.59 612,049.03 70° 17'56.703 N 149°5'33.150 W 174.00 0.51 94.03 174.00 -0.06 0.67 5,959,787.55 612,049.63 70°17'56.702 N 149°5 33.132 W 264.00 2.03 88.29 263.97 -0.04 2.67 5,959,787.60 612,051.62 70°17'56.702 N 149°5'33.074 W 354.00 3.79 84.59 353.85 0.29 7.22 5,959,787.99 612,056.17 70°17'56.705 N 149°5'32.941 W 447.00 4.94 81.49 446.58 1.17 14.24 5,959,788.98 612,063.17 70°17 56.714 N 149°5'32.737 W 539.00 6.57 86.87 538.12 2.04 23.42 5,959,789.99 612,072.33 70°17'56.723 N 149°5'32.469 W 631.00 9.10 90.72 629.25 2.24 35.95 5,959,790.37 612,084.86 70°17'56.725 N 149°5 32.104 W 722.00 12.43 94.67 718.64 1.35 52.91 5,959,789.74 612,101.83 70°17'56.716 N 149°5'31.610 W 762.56 13.89 95.80 758.13 0.50 62.11 5,959,789.03 612,111.04 70°17'56.708 N 149°5'31.342 W 855.77 16.91 95.99 847.98 -2.04 86.72 5,959,786.85 612,135.69 70°17'56.683 N 149°5'30.624 W 949.00 17.80 92.51 936.97 -4.08 114.45 5,959,785.22 612,163.43 70°17'56.663 N 149°5'29.816 W 1,044.65 19.05 93.46 1,027.72 -5.67 144.63 5,959,784.09 612,193.64 70°17'56.647 N 149°5'28.936 W 1,138.82 19.82 92.20 1,116.52 -7.21 175.93 5,959,783.02 61 2,224.95 70°17'56.632 N 149°5'28.023 W 1,235.62 21.71 91.25 1,207.03 -8.23 210.23 5,959,782.51 612,259.26 70°17'56.622 N 149°5'27.023 W 1,330.84 22.10 91.82 1,295.37 -9.18 245.74 5,959,782.09 612,294.78 70°17'56.612 N 149°5'25.988 W 1,420.63 22.66 92.77 1,378.40 -10.55 279.90 5,959,781.22 612,328.95 70°17'56.599 N 149°5'24.992 W 1,518.69 25.15 91.79 1,468.04 -12.12 319.60 5,959,780.25 612,368.67 70°17'56.583 N 149°5'23.835 W 1,610.79 27.04 91.20 1,550.75 -13.17 360.09 5,959,779.81 612,409.17 70°17'56.573 N 149°5'22.655 W 1,705.29 27.36 91.85 1,634.80 -14.32 403.27 5,959,779.30 612,452.36 70°17'56.562 N 149°5 21.396 W 1,801.46 27.64 91.68 1,720.11 -15.68 447.66 5,959,778.59 612,496.76 70°17'56.548 N 149°5'20.102 W 1,897.17 31.02 91.85 1,803.53 -17.13 494.51 5,959,777.85 612,543.62 70°17'56.534 N 149°5'18.736 W 1,940.00 33.64 91.87 1,839.72 -17.87 517.40 5,959,777.44 612,566.52 70°17'56.527 N 149°5'18.069 W 2,023.66 32.76 90.60 1,909.73 -18.87 563.20 5,959,777.13 612,612.32 70°17'56.517 N 149°5'16.734 W 2,091.46 36.18 89.20 1,965.61 -18.78 601.56 5,959,777.79 612,650.68 70°17'56.518 N 149°5'15.615 W 2,186.79 36.94 88.04 2,042.19 -17.41 658.33 5,959,780.01 612,707.41 70°17'56.531 N 149°5'13.961 W 2,282.26 35.75 89.37 2,119.08 -16.12 714.89 5,959,782.14 612,763.94 70°17'56.544 N 149°5'12.312 W 2,376.16 37.24 90.52 2,194.57 -16.08 770.74 5,959,783.02 612,819.77 70°17'56.544 N 149°5'10.684 W 2,471.13 41.38 92.10 2,268.04 -17.49 830.87 5,959,782.50 612,879.91 70°17'56.530 N 149°5'8.931 W 2,566.75 45.45 93.12 2,337.48 -20.50 896.50 5,959,780.47 612,945.58 70°17'56.501 N 149°5'7.018 W 2,661.13 48.40 94.11 2,401.93 -24.86 965.29 5,959,777.13 613,014.42 70°17'56.458 N 149°5'5.012 W 2,757.57 51.46 94.72 2,464.01 -30.55 1,038.87 5,959,772.54 613,088.07 70°17'56.402 N 149°5'2.867 W 2,851.94 55.30 95.55 2,520.29 -37.34 1,114.29 5,959,766.88 613,163.57 70°17'56.335 N 149°5'0.669 W 2,946.66 54.09 94.78 2,575.03 -44.31 1,191.27 5,959,761.06 613,240.65 70°17'56.266 N 149°4'58.425 W 3,040.83 53.62 94.75 2,630.57 -50.62 1,267.05 5,959,755.88 613,316.51 70°17'56.204 N 149°4'56.216 W 3,136.20 53.25 94.73 2,687.39 -56.95 1,343.39 5,959,750.69 613,392.92 70°17'56.141 N 149°4'53.990 W 3,227.30 53.23 94.95 2,741.91 -63.11 1,416.11 5,959,745.62 613,465.73 70°17'56.081 N 149°4'51.870 W 3,322.99 53.51 94.26 2,799.00 -69.27 1,492.66 5,959,740.59 613,542.35 70°17'56.020 N 149°4'49.639 W 3,417.75 55.08 94.22 2,854.30 -74.96 1,569.39 5,959,736.05 613,619.15 70°17'55.964 N 149°4'47.402 W 3,512.58 55.61 93.68 2,908.23 -80.34 1,647.21 5,959,731.84 613,697.04 70°17'55.911 N 149°4'45.134 W 3,607.65 55.74 93.51 2,961.84 -85.26 1,725.57 5,959,728.09 613,775.45 70°17'55.862 N 149°4'42.849 W 3,701.13 55.47 93.81 3,014.64 -90.18 1,802.55 5,959,724.31 613,852.49 70°17'55.814 N 149°4'40.605 W 3,796.95 54.11 93.45 3,069.89 -95.14 1,880.68 5,959,720.52 613,930.68 70°17'55.765 N 149°4'38.328 W 3,891.30 52.50 93.01 3,126.27 -99.41 1,956.21 5,959,717.38 614,006.26 70°17'55.723 N 149°4'36.126 W 3,986.14 53.34 93.60 3,183.45 -103.77 2,031.74 5,959,714.14 614,081.84 70°17'55.679 N 149°4'33.924 W 4,083.51 53.11 92.50 3,241.74 -107.92 2,109.62 5,959,711.15 614,159.77 70°17'55.638 N 149°4'31.654 W 4,178.46 53.80 92.51 3,298.28 -111.26 2,185.83 5,959,708.96 614,236.01 70°17'55.605 N 149°4'29.432 W 4,274.07 54.25 91.58 3,354.44 -114.01 2,263.16 5,959,707.35 614,313.36 70°17'55.578 N 149°4'27.178 W 4,370.30 53.28 90.32 3,411.33 -115.31 2,340.76 5,959,707.22 614,390.97 70°17'55.565 N 149°4'24.916 W 4,416.40 52.69 90.35 3,439.08 -115.52 2,377.57 5,959,707.55 614,427.78 70°17'55.563 N 149°4'23.843 W 4,511.95 54.06 87.20 3,496.09 -113.86 2,454.22 5,959,710.35 614,504.38 70°17 55.579 N 149°4'21.608 W 4,607.58 53.44 85.11 3,552.64 -108.70 2,531.16 5,959,716.66 614,581.23 70°17'55.629 N 149°4'19.366 W 4,701.34 50.02 82.88 3,610.71 -101.03 2,604.35 5,959,725.42 614,654.29 70°17'55.705 N 149°4'17.232 W 4,793.46 46.86 80.75 3,671.82 -91.25 2,672.57 5,959,736.21 614,722.35 70°17'55.801 N 149°4'15.243 W 4,888.77 44.76 75.61 3,738.27 -77.32 2,739.42 5,959,751.14 614,788.98 70°17'55.937 N 149°4'13.294 W 11/19/2010 8:39:48AM Page 3 COMPASS 2003.16 Build 73 4 Survey Report- Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well W-219 Project: Prudhoe Bay TVD Reference: W-219 Actual @ 86.90ft(Doyon 14) Site: PB W Pad MD Reference: W-219 Actual @ 86.90ft(Doyon 14) Well: W-219 North Reference: True Wellbore: W-219 Survey Calculation Method: Minimum Curvature Design: W-219 Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 4,982.83 44.70 69.60 3,805.13 -57.55 2,802.53 5,959,771.85 614,851.79 70° 17'56.132 N 149°4'11.454 W 5,071.00 42.27 64.62 3,869.11 -34.02 2,858.41 5,959,796.21 614,907.31 70°17'56.363 N 149°4'9.825 W 5,097.94 44.37 67.93 3,888.71 -26.59 2,875.33 5,959,803.88 614,924.11 70°17'56.436 N 149°4'9.332 W 5,178.34 44.21 69.62 3,946.27 -6.27 2,927.66 5,959,824.98 614,976.13 70°17 56.635 N 149°4'7.806 W 5,275.57 43.88 66.72 4,016.16 18.86 2,990.40 5,959,851.04 615,038.48 70°17'56.882 N 149°4'5.977 W 5,370.48 44.42 61.91 4,084.28 47.50 3,049.93 5,959,880.57 615,097.57 70°17'57.164 N 149°4'4.241 W 5,465.52 45.13 59.16 4,151.75 80.43 3,108.20 5,959,914.36 615,155.34 70°17'57.487 N 149°4'2.542 W 5,559.78 45.51 55.80 4,218.04 116.46 3,164.69 5,959,951.22 615,211.28 70°17'57.842 N 149°4'0.895 W 5,655.82 45.18 49.78 4,285.57 157.73 3,219.06 5,959,993.29 615,265.02 70°17'58.247 N 149°3'59.309 W 5,752.53 44.02 44.67 4,354.45 203.79 3,268.89 5,960,040.09 615,314.16 70°17'58.700 N 149°3'57.856 W 5,847.55 41.99 39.14 4,423.96 251.94 3,312.18 5,960,088.88 615,356.72 70°17'59.173 N 149°3'56.593 W 5,943.00 40.98 34.48 4,495.48 302.52 3,350.07 5,960,140.01 615,393.84 70°17'59.671 N 149°3'55.488 W 6,034.30 38.66 30.21 4,565.62 351.86 3,381.37 5,960,189.80 615,424.41 70°18'0.156 N 149°3'54.575 W 6,130.57 38.23 26.30 4,641.03 404.56 3,409.70 5,960,242.91 615,451.95 70°18'0.674 N 149°3'53.748 W 6,227.10 36.38 23.56 4,717.81 457.58 3,434.38 5,960,296.30 615,475.84 70°18'1.195 N 149°3'53.028 W 6,322.98 35.93 18.98 4,795.24 510.26 3,454.90 5,960,349.27 615,495.57 70°18'1.713 N 149°3'52.429 W 6,419.60 36.21 12.94 4,873.36 564.90 3,470.52 5,960,404.13 615,510.36 70°18'2.251 N 149°3'51.973 W 6,516.22 34.14 6.77 4,952.36 619.66 3,480.11 5,960,459.02 615,519.14 70°18'2.789 N 149°3'51.693 W 6,608.27 33.90 4.12 5,028.66 670.91 3,485.00 5,960,510.34 615,523.26 70°18'3.293 N 149°3'51.549 W 6,702.51 34.25 358.99 5,106.74 723.65 3,486.42 5,960,563.09 615,523.89 70°18'3.812 N 149°3'51.507 W 6,796.80 34.03 358.69 5,184.78 776.56 3,485.35 5,960,615.97 615,522.04 70°18'4.332 N 149°3'51.538 W 6,892.63 33.80 358.83 5,264.30 830.02 3,484.19 5,960,669.40 615,520.08 70°18'4.858 N 149°3'51.571 W 6,987.71 33.14 358.12 5,343.62 882.43 3,482.80 5,960,721.79 615,517.91 70°18'5.373 N 149°3'51.611 W 7,082.70 32.39 358.05 5,423.49 933.81 3,481.08 5,960,773.13 615,515.42 70°18'5.879 N 149°3'51.660 W 7,128.00 32.39 358.05 5,461.75 958.06 3,480.26 5,960,797.37 615,514.24 70°18'6.117 N 149°3'51.684 W Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 4,405.00 3,432.18 9 5/8" 9.625 12.250 Checked By: Approved By: Date: 11/19/2010 8:39:48AM Page 4 COMPASS 2003.16 Build 73 4 y ro Data Analyzer Query Results Query Name: LOT/FIT Fixed Field Data by Wellbore Comm.WB Date LOT/FIT MW(ppg) TVD(ft) TMD(ft) Surface BHP(psi) EMW(ppg) Name Press(psi) W-219 W-219PB1 111/13/2010 LOT 8.901 3,432.99. 4,405.991 660.01 2,247.21 12.60 W-219PB2 W-219PB2 12/20/2010 16:42 Page 1 of 1 8 v m m D i D oavr m o m D Z a N V N d 2 a' o m m� 3 0 C O P d O y 0 NN�O<_,,n23 P DI 0 sr 1) A J J S tD N�xT x m Qp {, mm n0 mmNtOml,DDu O up p O O s'Egi 6 d N N W a N 7 \, \k d n m d;m r Xi M oscm)cmimmcm)cmio m 9 D C m m N w m m D , �^ i 77c�,00,0000 O -< 0 0 00 00$ 00 00 o R oco Z —140.14 m y A `Z) To mmw om s_C/_1 Z r -I m a 1 0 m ? -\'� I� zi 0 0 CO r D.-1J If < ( 7 . a 0 s C 3' w O O+ .+0+0 mmo0&0moe m ;emeN;eate .0...80.. N a a r - m P4 o 0 W, p = m 3 O m x yd d„ DWN S y ---- O 2 :41,2 N a mo N , , , r / 1,0, 7DCDn mx � �J p d 31 NNd o O 0 o ' N G O •, Page 1 of 1 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Sunday, November 14, 2010 7:20 AM To: Johnson, David A(Swift); d Subject: Re: W-219 Complete plugging procedure. Dave, Your cementing plan meets regulatory requirements. Go ahead with your plan as written. Also, as you are moving the BHL less than 500 ft a PTD revision will not be needed. The Open hole PB data and operations should be included in the final 407 report. Guy Sent from my iPhone On Nov 13, 2010, at 9:20 PM, "Johnson, David A (Swift)" <David.A.Johnson @bp.com>wrote: Guy, Attached is the revised plugging and sidetracking procedure for W-219. We plan on setting three cement plugs from 6960' MD to 5100' MD. The plugs will bee 600', 600', and 660' in length. All permeable zones will be covered. The top of the Ugnu Ma is at 6030' MD. The kickoff point will be at 5220' MD. The directional plan is attached. The bottom hole location will move —203'. David Johnson BP Rotary Drilling Office: 907-564-4171 Cell: 907-632-5806 Fax: 907-564-4046 «W-219 Cement Plug v2.doc» «W-219_CONT_wp_9.pdf» «W-219_ST AK.txt>> <W-219 Cement Plug v2.doc> <W-219_CONT_wp_9.pdf> <W-219 ST AK.txt> 11/15/2010 /1- /Lt- r o W-219 1st Cement plug Procedure Fri) zro--100 Well Status: 9-5/8" casing is set at 4412'. The 8-3/4" hole was drilled to 6940' MD. A fault was crossed at - 6599' MD in the Schrader sands. It is necessary to plug the well back and sidetrack to cross to the other side of the fault. It is planned to spot cement across the Schrader and Ugnu sands as necessary for sidetracking. The KOP is at 5220' and cement will be brought to 5100' MD with three plugs. The top of the Ugnu Ma is at 6030' MD. All permeable zones will be covered HSE: PJSM's are required before every task. Please assess hazards and mitigate the risks before starting a job; even if the task seems to be a menial task to you. Small routine tasks deserve the same attention in regards to your personal safety as large non routine tasks. Cement Plug#1 6930'TD to 6030' From To Length Section Capacity BBLS Excess Total Yield Sacks 6360 6960 600 8-3/4" hole 0.07437 44.622 30.00% 58.0 bbls 1.17 278.4 sxs Cement: 15.8 PPG Class G Cement Plug#2 6360'to 5760' From To Length Section Capacity BBLS Excess Total Yield Sacks 5760 6360 600 8-3/4" hole 0.07437 44.622 30.00% 58.0 bbls 1.17 278.4 sxs Cement: 15.8 PPG Class G Cement Plug#3 6360'to 5760' From To Length Section Capacity BBLS Excess Total Yield Sacks 5760 6360 600 8-3/4" hole 0.07437 44.622 30.00% 58.0 bbls 1.01 338.6 sxs Cement: 17.0 PPG Class G 1. Pick up -800' of 3-1/2" tubing with guide. 2. Trip in hole to 6960' TD. 3. Mix and spot +/- 278sks (58 BBLS) of 15.8 ppg class G cement from 6960' to 6360. Pump 25.1 BBLS of 11.0 ppg spacer ahead of cement and pump 2.7 BBLS of 11.0 ppg spacer behind cement. Pump wiper balls ahead and behind cement. Cement volume is based on 30% excess. 4. Pull up 1000' at 2 minutes per stand. Circulate well clean. 5. Trip in hole to 6360' MD. Circulate bottoms up. W-219 1st Cement plug Procedure 6. Mix and spot +1- 278sks (58 BBLS) of 15.8 ppg class G cement from 6360' to 5760. Pump 25.1 BBLS of 11.0 ppg spacer ahead of cement and pump 2.7 BBLS of 11.0 ppg spacer behind cement. Pump wiper ball ahead and behind cement. Cement volume is based on 30% excess. 7. Pull up 1000' at 2 minutes per stand. Circulate well clean. 8. Trip in hole to 5760' MD. Circulate bottoms up. 9. Mix and spot +1- 292sks (61 BBLS) of 17 ppg class G cement from 5760' to 5100. Pump 25.1 BBLS of 11.0 ppg spacer ahead of cement and pump 2.7 BBLS of 11.0 ppg spacer behind cement. Pump wiper ball ahead and behind cement. Cement volume is based on 30% excess. 10.Pull up 5100' at 2 minutes per stand. Circulate well clean. If no cement is seen. WOC and tag cement. 11.POH and lay down tubing. 12. Pick up same drilling BHA as used to previous drill hole. 13.Sidetrack well as per approved well plan. Drilling parameters, mud, etc will be the same as the original drilling program. 1 1.3I ' o -ay-i6 BP - Alaska Prudhoe Bay PB W Pad Plan W-219 W-219 Plan: W-219 Standard Proposal Report 13 November, 2010 °N= HALLIBURTON Sperry Drilling Services €o E r 0 ii mm 5 , Zu �' NN W Z• N C7 U d E<"5,--re UNm1�NNm� nU-m M 2 M R M m N m O M m m M O1 K E 3 °N y+++ ° NN Wa6 l c KKr CrnOOV10 440.-M0M J 20) fC?rWK d m N U LL W LL w a a 4 aOO H ° �W$ $> oo° om°° o oo o wOO,d0000 p £ym£t£ a ; 17M2 r NN ^ Z mn mAm a MM ro N } DONNOQCO 2 _WowE 44 d d W C1 d •0N3 °o -$ —.13—.0`C � W naLL ¢ 3�o4'o°m�Mni°�, 0 • 3 a1 0 V d OIO W O ON OW(0W 0 L Imo' rnomwomm a > O N N Z +N M M M M M M 0. } N L O W N O 1-N N N M 3 W 0 3 y- • OfOVtOtON • g U IF p0/Icr V ccICL rn o WVLLLL OMWOW0<O M �P-1 ,I, r(UN-C)1tf m (9 23 mvv-wwww 2ooi-°oo Q-oovmmm 2 N £N F-O( MNNN000 N O a orpNO N t C r °I ' N 0'8 Npp m N N3 � oupp oo MOa y M MM ° N LLcn p CD CO - M £m N O O C r O r- an, ,oWMNN r c - 1- 0N a OOCC ei<64ito O O ii _ C wwwwm1°N W 0 m r r0 - N Z Co 0,-NMONmI� �. .- - M C W 3 - o _O 4l 0 0 M O M N O --m ,r) - M CV Q O 2 o v _ - O m J ai m O N V co O 0 LL as I- To c r c c o a U O C N Q O -O N c N W N J Q -t g c 4) N n. mcc Y cocLa c000 v «3 mNN 5/L0 W N° O ZD J M N moo 1° Co coo 0 0o Q CoiD W O ° N °W2 p Z MO�N R m '°M mm °° N Nc 4 m(O MM U a ."' R v ‘9'° y " § LT(' " J J rnmo 0+1-1 M AA r W vy C°, LO 0 8 8 w>> a ,W o j G G W W W 0 N " r C C p ?eo °_ mW N r N c( Co Z mEE 0 p ,-,- m CO 0 E 3 U Q 00 E roN Cm or- Zo L(n � Z Im Q .n566 mm•U m N N g m E,N jb o 333E w 30 W a n Co N N V V g Rc.:4 Z d m rr O m = wdN 0 U O m N W O O u1O r LL ,KKp UU 33 ?N m C 0 W N N J O O Z °J Z J I I I 1 I I I I 1 I a g3 " N 3 Ul Q gal N N v M N N(D 4( l 09z) ldoa !eojtJGA onk N 0> Ia N >, 00 �Q7 ImE C) st,Lo d g !„ ) R N N mm z ,-0e N -c° a S, MM �,��.s.• (i c°m ,.i a = N E- mo 0u_LLu_ m 0 =mo 3m H a a. a. i Z Lgg 0000 a QQ iii 2Y �Fwm N o c = V d -- a Z$$ H(7 mm ¢n' ''ppO 8 v; U 0 O d w 0) N w W(g© 2 ° 75015t% N h a. Z O ° c c O �0, u N A N� N> z aa P. 7 ill 0. iwwwN N n 1 W U m0°3 3 3 -- r I M Om amour m v o z -NNZ Q ✓ o 0 W 333 (�7 > na 0 kr, °> z E K o a°1 a - 0 I-. w E m o 0_mT O OI V, V e W C V'- > O C N M Z w et p > 8 aN3� �c q v mimes y 7 m3.�m 00 min ,7'- N TIN 00 -tm rn eW3 et Z a d UW N M Vl woo o Opprn To N W 0, 1 � F/ hill �22� 0 V N N 0 8 N N W ° L 3 0 0 °>�° Lg.-oo cl C °N N 0 �y N w 2^°2P LL N Q u rt ONN O ° r-mN m moo ity, o iii W - 0 L ■ - N G • a ° 0a N O - N- N 8 _- N 0 n N_ -- O 4 i F ',It oo .. N N �� I 33 0)dd N g P,M1 N W Z O o p >M W pp 00(0 N 0 N N N N N M M M M M WOO WOO 8887,8g88 O O G W iTdNMON00 N Q F L z 0)00 �[ W L •MM 0)0000000 v3 T Qo 00OOO 00 yN OO '' SS 00 °ONNOQOO I cN O Z u)Lc) J Q N W 0)IOONO0)Q 00W-M rr ,- M r� Q *g :O�N)li N v J +p W §oNv cc 002 p ° Nonivo mm c ��r I- O .V a WO(NOfNON is W ° P Z'tDOi Oi a J0 i- +.: W + QpO �°rm J •- 0 .4000 m •- t 0 V l W I! p.01N1OialW W tli t 0 O W o o M O Q V M N N (o N m 000 j J >.v.v '000(0(0000 J �tOW Q.-QQQWWao mo >W O._ M M Q N 0 0 0 oo co >Zrz ✓o Of' ~z 8 22 $8133 • _ Q M M M 3 o O 0 .0 0)O • W O N 5 °0 0 W W N h h ' 1 III1 IIII 1I I1 11II 1I II ' IIII 1III 1III IIII 1111 Ills 11 u) �� oom)+MiMOO NNWOrQW O N 7 )0 0 O N a N W 8 M NMI/1,01-.0 Z8 )0)0)0)OW Wn O .. O a W OD n b Q Q O y�-NMQ NtDr (UU$00Z)(+)y3�oN/(-)91nOS • Sperry Drilling HALLIBURTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well Plan W-219 Company: BP-Alaska TVD Reference: W-219 D-14 Planned @ 86.40ft(34.30KB+52.10) Project: Prudhoe Bay MD Reference: W-219 D-14 Planned @ 86.40ft(34.30KB+52.10) Site PB W Pad North Reference True Well Plan W-219 Survey Calculation Method: Minimum Curvature Wellbore: W-219 Design: W-219 Project Prudhoe Bay,North Slope,UNITED STATES Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB W Pad,TR-11-12 Site Position: Northing: 5,957,194.18ft Latitude: 70°17'31.506 N From: Map Easting: 609,919.18ft Longitude: 149°6'36.34 W Position Uncertainty: 0.00 ft Slot Radius: 0" Grid Convergence: 0.84 ° Well Plan W-219 Well Position +N/-S 0.00 ft Northing: 5,959,787.60 ft Latitude: 70°17'56.703 N +E/-W 0.00 ft Easting: 612,048.95 ft Longitude: 149°5'33.15 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 52.10 ft Wellbore W-219 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2009 11/13/2010 21.76 80.90 57,693 Design W-219 Audit Notes: Version: Phase: PLAN Tie On Depth: 5,220.00 Vertical Section: Depth From(TVD) +NI-S +E/-W Direction (ft) (ft) (ft) (°) 34.30 0.00 0.00 74.02 Plan Sections Measured Vertical TVD Dogleg Build Turn Depth Inclination Azimuth Depth System +NI-S +E/-W Rate Rate Rate Tool Face (ft) (°) (°) (ft) ft (ft) (ft) (°110011) (°/100ft)" (°1100ft) (e) 5,220.00 39.85 58.18 3,981.32 3,894.92 12.42 2,944.69 0.00 0.00 0.00 0.00 5,320.00 42.21 59.45 4,056.75 3,970.35 46.40 3,000.85 2.50 2.36 1.27 20.00 5,488.46 44.66 54.46 4,179.10 4,092.70 109.61 3,097.80 2.50 1.45 -2.96 -56.31 5,703.38 44.66 54.46 4,331.98 4,245.58 197.42 3,220.72 0.00 0.00 0.00 0.00 6,573.22 35.54 0.85 5,016.40 4,930.00 641.62 3,481.30 4.00 -1.05 -6.16 -124.92 6,745.27 35.54 0.85 5,156.40 5,070.00 741.62 3,482.79 0.00 0.00 0.00 0.00 7,085.27 35.54 0.85 5,433.06 5,346.66 939.23 3,485.74 0.00 0.00 0.00 0.00 11/13/2010 7.58 47PM Page 2 COMPASS 2003.16 Build 73 Sperry Drilling I-IALLIBURTON Standard Proposal Report Database: Sperry EDM 16 PRD Local Co-ordinate Reference: Well Plan W-219 Company: BP-Alaska TVD Reference: W-219 D-14 Planned @ 86.40ft(34.30KB+52.10) Project: Prudhoe Bay MD Reference: W-219 D-14 Planned @ 86.40ft(34.30KB+52.10) Site PB W Pad North Reference:" True Well: Plan W-219 Survey Calculation Method: Minimum Curvature Wellbore: W-219 Design: W-219 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-5 +El-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 3,894.92 5,220.00 39.85 58.18 3,981.32 3,894.92 12.42 2,944.69 5,959,843.92 614,992.87 0.00 2,834.32 KOP Start DLS 2.50 20°RT TF 5,300.00 41.74 59.20 4,041.88 3,955.48 39.58 2,989.35 5,959,871.74 615,037.12 2.50 2,884.73 5,320.00 42.21 59.45 4,056.75 3,970.35 46.40 3,000.85 5,959,878.73 615,048.52 2.50 2,897.66 5,400.00 43.35 57.02 4,115.47 4,029.07 75.01 3,047.03 5,959,908.02 615,094.26 2.50 2,949.94 5,488.46 44.66 54.46 4,179.10 4,092.70 109.61 3,097.80 5,959,943.37 615,144.51 2.50 3,008.27 End Directional 5488.46 MD 5,500.00 44.66 54.46 4,187.31 4,100.91 114.32 3,104.40 5,959,948.19 615,151.04 0.00 3,015.91 5,600.00 44.66 54.46 4,258.44 4,172.04 155.18 3,161.60 5,959,989.89 615,207.61 0.00 3,082.15 5,700 00 44.66 54.46 4,329.57 4,243.17 196.04 3,218.79 5,960,031.59 615,264.18 0.00 3,148.38 5,703.38 44.66 54.46 4,331.98 4,245.58 197.42 3,220.72 5,960,033.00 615,266.10 0.00 3,150.62 Start DLS 4.00 5703.38'MD 5,800.00 42.54 49.77 4,401.96 4,315.56 238.26 3,273.31 5,960,074.62 615,318.06 4.00 3,212.42 5,900.00 40.57 44.53 4,476.81 4,390.41 283.30 3,321.94 5,960,120.37 615,366.01 4.00 3,271.57 6,000.00 38.85 38.87 4,553.77 4,467.37 330.92 3,364.44 5,960,168.61 615,407.79 4.00 3,325.53 6,100.00 37.42 32.81 4,632.45 4,546.05 380.89 3,400.60 5,960,219 12 615,443.20 4.00 3,374.05 6,200.00 36.32 26.40 4,712.48 4,626.08 432.97 3,430.25 5,960,271.63 615,472.07 4.00 3,416.89 6,300.00 35.58 19.70 4,793.46 4,707.06 486.91 3,453.23 5,960,325.90 615,494.24 4.00 3,453.84 6,400.00 35.23 12.82 4,875.00 4,788.60 542.45 3,469.45 5,960,381.67 615,509.63 4.00 3,484.72 6,500.00 35.26 5.89 4,956.70 4,870.30 599.31 3,478.82 5,960,438.66 615,518.15 4.00 3,509.38 6,573.22 35.54 0.85 5,016.40 4,930.00 641.62 3,481 30 5,960,481.00 615,520.00 4.00 3,523.42 End Directional 6573.22'MD-W-219 Cont T1 6,600.00 35.54 0.85 5,038.19 4,951.79 657.19 3,481 53 5,960,496.56 615,520.00 0.00 3,527.92 6,700.00 35.54 0.85 5,119.56 5,033.16 715.31 3,482 40 5,960,554.69 615,520.00 0.00 3,544.76 6,745.27 35.54 0.85 5,156.40 5,070.00 741.62 3,482.79 5,960,581.00 615,520.00 0.00 3,552.38 W-219 Cont T2 6.800.00 35.54 0.85 5,200.93 5,114.53 773.43 3,483.27 5,960,612.81 615,520.00 0.00 3,561.59 6,900.00 35.54 0.85 5,282.30 5,195.90 831.55 3,484.13 5,960,670.93 615,520.00 0.00 3,578.43 7,000.00 35.54 0.85 5,363.67 5,277.27 889.67 3,485.00 5,960,729.05 615,520.00 0.00 3,595.26 7,085.00 35.54 0.85 5,432.84 5,346.44 939.07 3,485.74 5,960,778.46 615,520.00 0.00 3,609.57 TD at 7085.27 7,085.27 35.54 0.85 5,433.06 5,346.66 939.23 3,485.74 5,960,778.61 615,520.00 0.00 3,609.61 7" Targets Target Name •hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing, Easting -Shape. (°)` (°) (ft) (ft) (ft) (ft) (ft) W-219 Cont T2 0.00 0.00 5,156.40 741.62 3,482.79 5,960,581.00 615,520.00 -plan hits target center -Point W-219 Cont T1 0.00 0.00 5,016.40 641.62 3,481.30 5,960,481.00 615,520.00 -plan hits target center -Point 11/13/2010 7 58 47P Page 3 COMPASS 2003.16 Build 73 Sperry Drilling HALLIBURTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well Plan W-219 Company: BP-Alaska TVD Reference: W-219 D-14 Planned @ 86.40ft(34.30KB+52.10) Project Prudhoe Bay MD Reference: W-219 D-14 Planned @ 86.40ft(34.3OKB+52.10) Site PB W Pad North Reference: True Well: Plan W-219 Survey Calculation Method: Minimum Curvature Welibore: W-219 Design: W-219 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (") (.,) 7,085.27 5,433.06 7" 7 7 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E!-W (ft) (ft) (ft) (ft) Comment 5,220.00 3,981.32 12.42 2,944.69 KOP Start DLS 2.50 20°RT TF 5,488.46 4,179.10 109.61 3,097.80 End Directional 5488.46'MD 5,703.38 4,331.98 197.42 3,220.72 Start DLS 4.00 5703.38'MD 6,573.22 5,016.40 641.62 3,481.30 End Directional 6573.22'MD 7,085.00 5,432.84 939.07 3,485.74 TD at 7085.27 11/13/2010 7:58:47PM Page 4 COMPASS 2003.16 Build 73 a mm o Y L m d 5 ? o 0 co Z U (0 - O' Q V O N 1 - H � Q E<>.-m - 1- U .MU8 _ < 3 ✓' Y' \� ONMQO)OOMN N>>> W G CO N taw /)00)oM0)NN jN = � ��H W a=' o -- tof) 7� N00 t�+7(MDR U) O QQ .. M - - r W Ommm(0 Z =J"O EU 0)0 - NN(0MMMM 5,..5 H a L o L f 0 L JN O �(n�m� , \--- 1000000700 Q z i' - LL O O N O N O O m W ooc`oo -- H 0 ❑ OW`COLUE / ' O) Oro >- 3 0 _ 0)0000000 N -r Z u aorn 00000 N Jura) a v o o \\\ o0,-oi0000 N ` 0 0 I 1 I \ ,:t / I I I I U) 3(�ONN�rN� \ • W JyO) ; ' ■ 1\ \ \ f• / / / /I 1 F- Q WNOO NU)oObi p v \ �, \ \�• -. / // / I W NOMeeMM L .. \■ - h / p j 2 10 N \1, \ \ ) 0 ---\ / /// ^ / O ZOON0MNNU) �- -� / /./ F +gvOrnlMOnm rn �v ; i. mi -;, n / /` W 0)o _ ,\.-\ _ - N lO') \��^ i ---'^ i\ /^ / 0 ❑MOO(0W NNO)NI Z \ • -/- [00'-N)0 rn 0 o /. /. Cl. Or - -1 _i -� Mvovin u7,n N � o- O r- -7 N O N b (N N N O N a 0 d 0 V o M co 0 c jI rU) OOO owww o o0 oo- No g3 o 0 Wo U' mo00 0 S�-�_ _ + Z Z H._N 00-000 V V C CO N O(0 1010 10 .O W Eoo +4-.4...+a-comm N m -20 N o c c 0 N +O O Ud o 0000cONrr O O V M N N N O O UMM10 t0 J L O m 0(0N-0 r 0 OJ yLL o y = t0t0t01otO(Or U ,_NMQU(Or H all)2 Eo 0) i00 < N�N LL N Oct;OO r y a,cc d6zr M L° O - N M Zm o - 1- - J O N Q ow vo 0 o to M C >MN s Q. wow C 222 _ N U LL LL LL Op❑p \ ` C N 10 ul cv O to O p O to I o N i.' N. CO N N N to t` O o to 00 N N Q O H _,main aLL a N -- mm> M __ IEI� 6 o 033 E O a 3ooc°� r -' �' c d 1 C T,-N m - - _ -- --',,c , C Y az>>3 c c Ce °. . 0 0,-cr) r) Z m >--co- o S 4 M - - , , N m co 0 2 5. t LE \ ,ml > .? OW \ _ _ _ _ - <' E' m HO�ON -- - '\ ..-333f N a DI. - \O N ' C p N o P u u o RR - 0- ., 000 z - 0 " °= N W _ 0 v W s` 0 o ey n 1 N LL .00 u; Ji _ Lot000 N J TO dmNmo / L li Z t n BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well W-219 Project: Prudhoe Bay TVD Reference: W-219 Actual @ 86.90ft(Doyon 14) Reference Site: PB W Pad MD Reference: W-219 Actual @ 86.90ft(Doyon 14) Site Error: 0.00ft North Reference: True Reference Well: W-219 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore W-219 Database: EDM.16-ANC Prod-WH24P Reference Design: W-219 Wp 9 Cont Offset TVD Reference: Offset Datum Reference W-219 Wp 9 Cont Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 5,020.00 to 7,085.27ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 905.05ft Error Surface: Elliptical Conic Survey Tool Program Date 11/13/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 79.00 722.00 Gyro Survey(W-219PB1) GYD-GC-SS Gyrodata gyro single shots 762.56 1,897.17 MWD Run 100(W-219PB1) MWD+IFR+MS MWD+IFR+Multi Station 1,940.00 5,020.00 MWD Run 200(W-219 Pb2) MWD+IFR+MS MWD+IFR+Multi Station 5,020.00 7,085.27 W-219 Wp 9 Cont(W-219) MWD+IFR+MS MWD+IFR+Multi Station Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB W Pad Plan W-202-Plan W-202 OBd-Plan#7 W-202 0 Out of range Plan W-202-Plan W-202L1 OBc-Plan#7 W-202 Out of range Plan W-202-Plan W-202L2 OBa-Plan#7 W-202 Out of range Plan W-220-Plan W-220-Plan W-220 Out of range Plan W-220-Plan W-220-W-220 WP 12.0 Out of range Plan W-223-Plan W-223-Plan#9 W-223 Out of range W-18-W-18-W-18 Out of range W-20-W-20-W-20 Out of range W-201-W-201-W-201 Out of range W-201_DIMS-W-201-W-201 Out of range W-21-Plan 6,W-21AL1-Plan 6 Out of range W-21-Plan 6,W-21AL1-01-Plan 6 Out of range W-21-W-21-W-21 Out of range W-21-W-21A-W-21A Out of range W-214-W-214-W-214 Out of range W-214_DIMS-W-214-W-214 Out of range W-215-W-215-W-215 Out of range W-216-W-216-W-216 Out of range W-216_DIMS-W-216-W-216 Out of range W-217_DIMS-W-217-W-217 Out of range W-217_DIMS-W-217PB1-W-217 PB1 Out of range W-218_DIMS-W-218-W-218 Out of range W-219-W-219 Pb2-W-219 Pb2 5,025.00 5,025.00 0.01 0.65 -0.64 FAIL-NOERRORS W-23A_DIMS-W-23A-W-23A Out of range W-56-W-56-W-56 Out of range 11/13/2010 7:51:11 PM Page 2 of 3 COMPASS 2003.16 Build 73 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well W-219 Project: Prudhoe Bay TVD Reference: W-219 Actual @ 86.908(Doyon 14) Reference Site: PB W Pad MD Reference: W-219 Actual @ 86.90ft(Doyon 14) Site Error: 0.00ft North Reference: True Reference Well: W-219 Survey Calculation Method: Minimum Curvature Well Error: 0.008 Output errors are at 1.00 sigma Reference Wellbore W-219 Database: EDM.16-ANC Prod-WH24P Reference Design: W-219 Wp 9 Cont Offset TVD Reference: Offset Datum Reference Depths are relative to W-219 Actual @ 86.90ft(Doyon 14) Coordinates are relative to W-219 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.000 W° Grid Convergence at Surface is:0.85° Ladder Plot 220- _ 165- 0 ca o_ f) 110- • a) i Y i U 55- • LEGEND 0 I I I I I 2C2,Plan W-202OOd,Plan#7W202O VV--giggbNOT USE,VV45IQQ,W-19AL1 V4 6000 W2�1§Q/ -215,W215W 9000 2C 2.Plan VV202L1OBc,Plan#7VV202L1 V0 VV19_DONCMWLIUe El(1, /11W)31V3 -€E- W-216,W-216,W-216 V7 2C2,Plan VV-202L2OBa,Plan#7 VV-202L2 OBa VO -0- W19 DC)NOT USE,VV-19AL1PB2,VV19AL1PB2V2 -0- W216 DIMS,W216,VV216V0 220,Plan W-220,Plan W-220 V0 W-20,VV20,VV20V2 -0- W-217,W-217,W-217V0 22 0,Plan W-220,W-220 VW 12.O V0 W-200,W-200,W-200 V2 W-217.W-217PB1,W-217PB1 V0 221,Plan W-221,Plan#10 W221 V0 $- VV200,VV20UPB1,VV200PB1 V11 -&- W217_DIMS,VV-217,W217V0 223,Plan W-223,Plan#9VV223V0 -iS- W-201,W-201,W-201 V4 W-217_DMS,W-217PB1,W-217PB1 V0 8,W-18 V2 -3'(- W-201_DIMS,W-201,W-201 VO -tr W-218,W-218,W-218 V1 ■F'9,W19V3 - VV204,W-204,VV204V2 W218_DIMS,VV-218,W218V0 J-19A,W-19AV3 -e- W-204,W-204L1,W204L1V6 W-219,VV-219Pb2.VV-219Pb2V0 J-19AL1,W19AL1 V4 -9- W-204,VV204L2,VV204L2V6 VV219,VV-219PB1,VV-219PB1 V0 Al9AL1PB1,W19AL1PB1 V3 -0- VV-204,VV204PB1,VV204PB1 V2 $ VV22,W-22,W-22 V2 f19AL1PB2,W19AL1PB2V2 -9- W-21,Plan 6,VV-21AL1,Plan 6V0 VV-23,VV-23,W-23 V5 J-T967777Juvu - TT ,-.n.,r" • I ,-an.vs VV-16, VV-2.9-1W3 11/13/2010 7:51:11PM COMPASS 2003.16 Build 73 sunU ASEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 Robert Tirpack Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Polaris Oil Pool, PBU W-219 BP Exploration (Alaska), Inc. Permit No: 210-105 Surface Location: 4811' FSL, 1177' FEL, SEC. 21, T11N, R12E, UM Bottomhole Location: 498' FSL, 2111' FWL, SEC. 15, T11N, R12E, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to drill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, / Daniel T. eamount, Jr. Chair DATED this 11 day of August, 2010. cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RRECE VE D,„�%3d ALASKA" AND GAS CONSERVATION COMMIS' I 8 9-/O PERMIT TO DRILL - g 6 2.010 20 AAC 25.005 .,:.,`f'r :reos Ct11tlIMISSIO(1 'la.Type of work: 1 b.Proposed Well Class: ❑Development Oil lg Service-Winj ❑Single Zone 1c' cffy i we iss�pro sed for: ® Drill ❑Redrill ❑Stratigraphic Test ❑Development Gas ❑Service-Supply ❑Multiple Zone ❑ Coalbed Gta3'IC N Hydrates ❑ Re-Entry ❑ Exploratory Service-WAG ❑Service-Disp ❑Shale Gas 2. Operator Name: 5.Bond: ® Blanket ❑Single Well 11. Well Name and Number: BP Exploration(Alaska)Inc. Y'°-/O Bond No. 6194193 PBU W-219 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O.Box 196612,Anchorage,Alaska 99519-6612 MD 7007' TVD 5416' Prudhoe Bay Field/Polaris 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Pool Surface: ADL 028263 4811'FSL, 1177'FEL,SEC.21,T11N,R12E,UM(As Staked) Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 153'FSL,2105'FWL, SEC. 15,T11N, R12E, UM September 25,2010 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 498'FSL,2111'FWL,SEC. 15,T11N, R12E, UM 2560 18,040' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: —87.1 feet 15.Distance to Nearest Well Open Surface: x- 612049 y-5959788 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 894' 16.Deviated Wells: Kickoff Depth: 300 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 53 degrees Downhole: 2354 Surface: 1822 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight , Grade Coupling Length MD ND MD ND (including stage data) 42" 20" 129.5# X-65 Weld 80' Surface Surface 80' 80' -260 sx Arctic Set 12-1/4" 9-5/8" 40# L-80 BTC 4428' Surface Surface 4428' 3442' 654 sx Arctic Set Lite.407 sx Class'G' , 8-3/4" 7" 26# L-80 TC-II/ 7007 Surface Surface 7007' 5416' 281 sx Class'G' . BTC-M 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): Casing Length Size Cement Volume MD ND Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth ND(ft): 20.Attachments: ❑ Property Plat ®BOP Sketch ®Drilling Program ❑Time vs Depth Plot ❑Shallow Hazard Analysis CO Diverter Sketch ❑Seabed Report ®Drilling Fluid Program 18120 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Mark Staudinger,564-5733 Printed Name bert Tirpack Title Engineering Team Leader Prepared By Name/Number: Signature .. ..4: 7 Phone 564-4166 PA Date Terrie Hubble,564-4628 Commission Use Only Permit To Drill API Number: Permit trt•val Ir)a;: I See cover letter for Number: �f0/ 5 50-O'9,�,3��9OZ70P \ other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: Other: yWE O ASi. act rCSf_ Samples Req'd: ❑ es LJiNo Mud Log Req'd: ❑Yes IAN *23`00 ps' Ann�-1-'-4' el sf (b,.4_t ) �jHZS Measures: [y�Yesp❑No Directional Survey Req'd: Yes ❑No x.WACI Bernice. k Se�pa.r as.� 'raii on.f_y /4/l�4- re-Pno0j 4." 11 - < nob *Ufi4sp- o perJr ok w.CCot-' W/ AI0 ,SA v M /T - e' ; Zco X44 zs_ l !! 9�� to` e//, ! Date • ' APPROVED BY THE COMMISSION_ ,COMMISSIONER Form 10-401 Revised 7/2009 This permit is valid for 4 months from the date of ap royal(20 AAC 25.005(g)) Submit In Duplicate ORIGINAL e-'.-% 3(,-0 Well Name: W-21 9i Drill and Complete Plan Summary Name Position Office Home Cell Mark Staudinger Drilling Engineer 5733 929-5850 440-7403 Doug Wilson Geologist 4517 345-4294 240-4870 Bob Dawson Ops Geologist 5264 345-3359 242-2391 Taylor West Pad Engineer 4647 337-2028 632-0111 • Type of Well (service/ producer/ injector): 1 Injector Surface Northing Easting Offsets TRS Location 5,959,788 612,049 4810' FSL/ 1178' FEL 11N, 12E, 21 Northing Easting TVDss Offsets TRS Target 5,960,460 615,320 -4390 153' FSL/ 3175' FEL 11 N, 12E, 15 Locations 5,960,582 615,321 -5070 275' FSL/ 3172' FEL 11N, 11E, 11 Bottom Northing Easting TVDss Offsets TRS Location 5,960,805 615,320 -5329 498' FSL/3169' FEL 11N, 12E, 15 API NUMBER: I TBD Rig: i Doyon 14 Estimated Start Date: 1 9/25/2010 Operating Days to complete: 1 17.3 MD: 1 7007' TVD: 15416' _RT/GL: 134.3'/52.8' RTE: 187.1' Well Design: Grassroots Schrader Bluff Injector • 3 '/2" tbg, 9.2# L80, TC-ll, multi-packers, zonal injection Objective: 1 Multi-zonal injector into Schrader Bluff OBa, OBc, and OBd sands Directional Plan: Version: Sperry P6 KOP: 300' MD, build 2.5/100 Maximum Hole Angle: 53° Close Approach Wells: All wells pass major risk criteria. Reference anti-collision report Nearest well within Pool W-219i is 894'from W-17. Distance to Nearest Property 18,040'to PBU boundary Line: W-219i Permit Application Page 1 Wells within '/a mile of this injection well: Well Name Dist, Ft. Annulus Integrity Comments Abandoned wellbore with 30 bbls Class'G'cmt across perfs, 23 bbls Class'G'cmt plug @ -10,100', set EZSV @ W-17 894' 5599', section mill 9-5/8"csg from 5240'to 5346'. Pumped 55 bbls Class 'G' Kick-Off Plug (top@ 5036') -sidetracked to W-17A. Kicked off @ 5240'. 7" Liner top @ 4933'. Returned 35 W-17A 1010' bbls cement to surface. USIT log indicates poor to moderate cement coverage across OA and OB sands, but possible isolation in Nb sand. No annular communication. MIT-IA Passed to 4000 psi on 10/31/08. Ran 7"casing to 6319'and pumped 74 bbls Class 'G'. No losses noted. Calculated TOC @ 4313' MD, 3879'TVD based on 30%excess hole volume. Post-rig cement bond / W-212i 1071' log indicates fair to good cement isolation to tubing tail @ 5127' MD (minimum). Log shows there is a minimum of 688'of cement isolation above the top pert in the OBa, and minimum of 351'cement isolation above top of pool (UG_Mc). No annular communication. MIT-IA passed to 2500 psi on 05/01/07. BP Exploration(Alaska), Inc. (BPXA),requests administrative approval under Area Injection Order No. 25A(AIO 25A)to allow for the injection of enriched hydrocarbon gas into injection well W- 219. The rule provides that upon "proper application"additional water injecting wells can be reclassified as WAG injectors. BPXA requests that this AA be approved as part of the Permit to Drill. a- -/-h s Not y The area of review for this planned injector shows that there are no offset injectors present within a one- _m_ia quarter mile radius of W-219 as depicted by Figure 1.The only other wellbores present within a'A mile of W-219 planned well path are W-17,W-17A, and W-212i. Upon completion and determination of successful cement integrity, BPXA requests WAG approval without a separate application. W-219i Permit Application Page 2 I Figure 1 — 1/a Mile Radius of W-219i Polaris Pool - Markers U -UG_Mc (Top of Pool) 1/4 mi. radius Circle 0 -SB OBa Centered on W-219 OBa • -SB OBf Base W-205 .. �� / 4 a l'' -- 5,962,000 i , 1\t/4 \ A V -iLl P-84-n W-215 k lig W-2•.wp06 111".- -, \k, i , � W-212 r • 1 5,960,000 r' _ W-17A labinnomallii Allr. . id& 161 I _ a \\ , • W 16 �� 5,958,000 614,000 616,000 SB OBa Depth Map 1 /4 mile radius on W-21 9i OBa Wells within 1/4 mile of W-219i Within the Polaris Pool: W-212, W-17, W-17A W-219i Permit Application Page 3 Logging Program: Surface Interval Drilling, MWD: GR Open Hole: None Cased Hole: None Intermediate Interval Drilling, MWD: N/A Open Hole: N/A Cased Hole: N/A Production Interval Drilling, MWD: GR, RES, NEU, Azimuthal Density, PWD Open Hole: None Cased Hole: USIT(Primary Depth Control mode) Mud Program: 12 '/4" Surface Hole: Fresh Water Drilplex Mud Density Funnel Viscosity LSYP Yield Point API FL (ppg) (seconds) (Ib/1 (mis/30min) (2x3-6 rpm) Spud to Base 8.5-9.5 60-120 (for reference 40-60 50-70 NC 10.8-11 PF only. Fluid should be run off LSYP) Base PF to 8.5 -9.5 Same 30-50 55-60 NC 10.8-11 TD 8 3/4" Production Hole: LSND Interval Density YP PV pH API (ppg) Fluid Loss . Csg Shoe to TD 8.8-9.2 18-24 8- 14 9- 10 <6.0 Casing/Tubing Program: Hole Size Csg/ Wt/Ft Grade Connection Length Top Btm Tbg O.D. MD/TVD MD/TVD RTE 42" 20" 129.5 X-65 WLD 80' GL 80'/80' 12 3/4" 9 543" 40 L-80 BTC 4428' GL 4428'/3442' 8 3A" 7" 26 L-80 TC-II 5928' GL 5928'/4581' ° 8 3A" 7" 26 L-80 BTC-M 1079' 5928'/4581' 7007'/5416' Tubing 3'/" 9.2 L-80 TC-II 6767' GL 6767'/5234' Comments: I Tbg crossover to 4'h"just below tree Integrity Testing: Test Point Depth Test Type 9 5/8" Surface Casing 20'-50'from surface shoe LOT W-2191 Permit Application Page 4 Cement Calculations: Surface Casing: Casing Size 19 5/8" Basis: Lead: Open hole volume+250% excess in permafrost and 40%excess below permafrost. Port collar used if necessary. Lead TOC: Surface Tail: Open hole volume+40%excess+80'shoe track. Tail TOC: 1000' MD above the casing shoe (3428' MD) Total Cement Volume: Lead 519 bbl/2911 ft'/654 sks of Arctic Set Lite at 10.7 ppg and 4.45 cf/sk Tail 84 bbl/472 ft'/407 sks of Class 'G'at 15.8 ppg and 1.16 cf/sk Production Casing: Casing Size I 7" J Basis: Lead: None Planned Lead TOC: N/A Tail: Open hole volume with 30%excess and 80'shoe track volume, ID 6.276" Tail TOC: 5428' (1000' MD below surface shoe) Total Cement Volume: Lead None Planned Tail 58 bbl/326 ft'/281 sks of Class 'G'at 15.8 ppg and 1.16 cf/sk W-219i Permit Application Page 5 Formation Markers: Est. Commercial Formation Hydrocarbon Est. Pore Est. Pore Updated for WP6 Tops Uncertainty Bearing Press. Press. Formation (TVDss) (feet) (Yes/No) (Psi) EMW) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells G1 -300 +/-50' No 135 8.7 SV6 -1200 +1-50' No 540 8.7 EOCU -1755 +/-50' No 790 8.7 SV5 -1840 +/-50' No 828 8.7 Base Permafrost -1860 +/-50' No 837 8.7 Poss. Free Gas or SV4 -1985 +/-50' Gas Hydrates 893 8.7 Poss.Free Gas or SV3 -2485 +/-50' Gas Hydrates 1118 8.7 Poss. Free Gas or SV2 -2695 +/-50' Gas Hydrates 1213 8.7 Poss. Free Gas or SV1 -3020 +/-50' Gas Hydrates 1359 8.7 UG4 -3385 +/-50' Thin coal 1523 8.7 Heavy Oil down to UG4A -3405 +/-50' --3525 tvdss 1532 8.7 UG3 -3765 +1-50' Thin coals;wet 1694 8.7 UG1 -4240 +1-50' No,wet 1908 8.7 Heavy Oil between-4495 UG_Ma -4495 +/-50' and-4540 SS 2023 8.7 Heavy Oil between-4540 UG_Mb1 -4540 +/-50' and-4590'SS 2043 8.7 UG_Mb2 -4590 +1-50' No,wet 2066 Heavy Oil between-4670 UG_Mc -4670 +/-50' and-4710'SS 2102 8.7 SB_Na -4735 +/-50' No,wet 2131 8.7 Fault#1 -4740 +/- 100' M.D. 2133 8.7 SB_Nb -4755 +/-25' No,wet 2140 8.7 SB_Nc -4790 +/-25' No,wet 2156 8.7 SB_Ne -4800 +/-25' No,wet 2160 8.7 Yes(just above SB_OA -4890 +/-25' OWC) 2201 8.8 SB_OBa -4940 +/-25' Yes 1877-2075 7.3 -8.1 SB_OBb -4970 +/-25' Yes 2237 8.7 SB_OBc -5020 +/-25' Yes 2159-2259 8.3-8.7 SB_OBd -5070 +/-25' Yes 1927-2129 7.3-8.1 SB_OBe -5140 +/-25' Yes 2313 8.8 SB_OBf -5180 +/-25' Yes 2331 8.7 Base_SB_OBf -5230 +/-25' No 2354 8.7 TD -5329 W-2191 Permit Application Page 6 Well Control: 12 1/4" holes will be drilled with diverter. The 8 3/4" intermediate hole will use well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Annular preventer will be tested to 2500 psi. Rams will be tested to 4000 psi.'The BOP test frequency will be conducted on a 14 day frequency, with a function test every 7 days. Except for significant operational issues that may effect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. Diverter, BOPE and drilling fluid system schematics of Doyon 14 are attached to this permit to drill. Production Interval- • Maximum anticipated BHP: 2354 psi @ 5317' TVD, 8.6ppg EMW • Maximum surface pressure: 1822 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) • Planned BOP test pressure: • Annular Preventer 250/2500 psi • Rams 250/4000 psi • Planned completion fluid: 9.2 ppg brine/6.8 ppg diesel (7007' MD, also TD) Kick Tolerance/Integrity Testing Summary Table Casing and Casing Test Maximum Mud Weight Exp Pore LOT/ Interval Pressure Influx Press FIT Volume 95/8" Surface 3500 psi 50 BBLS 9.2 8.8 LOT Casing (assuming 11.1 LOT) 7" Production 4000 psi NA NA NA NA Casing Disposal: • No annular disposal in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS- 04 for disposal. Haul all Class I wastes to Pad 3 for disposal. Variance Request: To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling 1 surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line. W-219i Permit Application Page 7 W-219i- Drill and Complete Procedure Summary Pre-Rig Work: 1. Install Cellar Box and set 20"Conductor to+/- 108'. 2. Weld an FMC landing ring for the FMC USH Gen 5 wellhead on the conductor. . 3. If necessary, level the pad and prepare location for rig move. Shut in nearby wells, bleed off process lines, and remove well houses as necessary Rig Operations: 1. MIRU Doyon 14. Nipple up diverter spool and function test diverter. • 2. Prepare pits with Drillplex Mud and pickup enough 4" DP to TD surface hole. 3. MU 12-1/a" drilling assembly with MWD/GR. Directionally drill surface hole to the base of permafrost. Perform wiper/bit trip and drill to TD 30' TVD about the UG4. CBU and condition hole as necessary, then POOH and lay down BHA. 4. Run and cement the 9-%", 40.0 lb/ft surface casing to surface with the Tesco CDS Tool, displacing. cement with mud. A TAM Port collar may be run at-1000' as a contingency. 5. ND diverter spool and NU and test casing/tubing head. NU BOPE and test rams @ 4,000 psi / 250 ; psi, and annular to 2500 psi/250psi. 6. MU 8-3/4" drilling assembly with MWD/GR/Res/Azi-Den/Neu/PWD and RIH to float collar. Pressure test the 9-5/8" casing to 3500 psi for 30 minutes. Drill shoe track and displace to new LSND mud. - Drill new formation to 20-50' below 9-%"shoe and perform LOT. 7. Drill ahead to production hole TD (250' MD below the base of OBe). Back-ream/MAD Pass as needed,then POH to run casing. 8. Change to 7" rams and test prior to running casing. 9. Run and cement the 7", 26#, L-80, BTC-M x TC-II production casing. Displace the casing with brine, and pressure test casing to 4,000 psi for 30 minutes at plug bump. 10. Install and test 9 5/8 x 7" pack-off. Establish injection rate in the 7"x 9-5/8"annulus. Change 7" rams back to Variable Bore Rams. 11. Freeze protect the 7" x 9-%" annulus. Confirm 500 psi cement compressive strength prior to freeze . protecting. 12. PU DPC guns and RIH w/ -100' of 4.5" Power Jet 4505 5 spf, pert guns with LWD GR/CCL for gun° correlation. 13. Once correlated correctly, confirm cement compressive strength is at least 1,000 psi before firing. Perforate the OBa, OBc, and OBd sands. POOH LD DP and guns. 14. RU Schlumberger E-line. RIH with gauge ring and junk basket to recover any pert debris. Repeat until clean to at least 50' below the bottom perforation. 'f 5. Run USIILC;RI log following Primary Depth Control procedures as USIT log will be primary depth control for future well work. 16. Run the 3-1/2", 9.2#, L-80, TCII completion with a 7" x 3-1/2" straddle packer assembly, I-wire, gauges, and injection mandrels. Torque turn TC-II threaded tubing. Top packer must be within 200' of OBa perfs. Confirm that packers are on depth using E-line. 17. Run in the lockdown screws and set the packers. Give AOGCC 24 hours notice, then test the production casing/tubing annulus and tubing to 4,000 psi each. Shear the DCR shear valve and pump both ways to confirm circulation ability. 18. Install and test FMC TWC. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 19. Freeze protect the well to 2,500'TVD by pumping corrosion inhibited brine down the IA with rig pumps followed by diesel down IA w/ Hot Oil truck, taking clean brine returns to surface. Allow diesel to u- tube � 9 tube into tubing. 20. Install BPV in tubing hanger. Install a VR plug in the 7"x 3-1/2" annulus valve and secure the well. ' Assure that IA/OA are protected with two barriers. 21. Rig down and move off. W-219i Permit Application Page 8 0 Post-Rig Work: 1. Pull BPV. 2. R/U Slickline and pull ball and rod/RHC from the tailpipe. 3. Replace the DCR shear valve with a dummy GLV. 4. Pull dummy valves in injection mandrels and replace with injection valves. 5. Pull VR plug. 6. Install wellhouse and flowlines. 7. Pump RG2401 (Blue-Goo) on top of surface casing cement. W-219i Permit Application Page 9 r Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control/Reservoir Pressures: Interval Psi(EMW) TVDss MD Schrader Bluff 1877-2354 4890- 6428- Sands (7.3-8.8) 5230 6877 II. Hydrates and Shallow gas: A. Free gas and/or gas hydrates may likely be present in the SV5 through the SV1 surface hole below the Permafrost base. Use standard operating procedures for hydrates, if encountered. Set surface casing below deepest SV1 sand hydrate zone to isolate gas bearing intervals behind cemented pipe in surface hole from intermediate hole section. III. Running Gravels: A. Unconsolidated sand, gravel, &cobbles and thawing permafrost could impede well angle build and casing running through permafrost. Keep moderate to low build angles until out of permafrost section. Keep flow rates low. Hazards include wood and cobbles, running gravels, lost circulation, and tight hole problems while drilling and running casing. See W Pad Data Sheet for details. B. Recent W Pad wells have experienced tight hole, running gravels, and lost circulation with drilling and running casing in Permafrost interval. Use best practices for drilling and lining surface hole interval. Base plan is to use the Tesco CDS casing running tool to address this problem for 9- 5/8"casing. IV. Faults Formation Where MD Est. Throw Encounter Fault Intersect tvdss Throw Direction Uncertainty Schrader N Sands 6216 -4725 0 to 30' West +1- 100' M.D. V. Lost Circulation/Breathing: A. Fault#1 was previously penetrated by W-205 (5799' MD) and W-203 (6018' MD) in the lower UG1 interval. Neither well reported lost circulation while drilling, running casing, or cementing. Lost circulation is not expected from this fault. B. Minor pressure depletion of OBa, OBc and OBd zones produced in offset well W-205 to as low as 7.3 ppg. W-219i Permit Application Page 10 VI. Kick Tolerance/Integrity Testing: A. The 9 5/8" casing will be cemented to surface using a port collar at 1000' if necessary. The 7" casing will be cemented 1000' MD below 9-5/8" surface shoe. J _ Kick Tolerance/Integrity Testing Summary Table Casing and Casing Test Maximum Mud Weight Exp Pore LOT/ Interval Pressure Influx Press FIT Volume 95/8" Surface 3500 psi 50 BBLS 9.2 8.8 LOT Casing (assuming 11.1 LOT) 7" Production 4000 psi NA NA NA NA Casing VII. Heavy Oil A. Heavy oil is expected in the UG4A, UG_Ma, UG_Mb1, and UGMc intervals which could result in plugging of shaker screens. Follow established operating practices for drilling in heavy oil zones. VIII. Broaching A. Monitor adjacent wells for broaching while drilling surface hole. IX. Hydrogen Sulfide A. All W Pad gas lift wells are expected to have H25 levels in the 5 to 60 ppm range; result of PBU gas lift gas. This site should be treated as an H25 site with all the required precautions. Well Name H2S Level Date of Readin. #1 Closest SHL Well H2S Level W-201 18 ppm 10/8/2009 #2 Closest SHL Well H2S Level W-200 24 ppm 10/7/2009 #1 Closest BHL Well H2S Level W-17A 15 ppm 10/28/2006 #2 Closest BHL Well H2S Level W-212i N/A Max. Recorded H2S on Pad/Facility W-01A 60 ppm 8/16/2005 Other Relevant H2S Data All W Pad gas lift wells are expected to have H2S levels in the 5 to 60 ppm range as a result of using PBU gas lift gas and (H2S alarms from rigs, etc.) produced water for injection. CONSULT THE W PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION W-219i Permit Application Page 11 TREE= 4-1/8"CM/ SAFETY NOTES:***HES M FA PKRS ARE CUT-TO- A WELLHEAD TOR= FMC VV-21 -� •i Proposed EXC PSI. PKR PRESSURE RATING.500 NOT ACTUATOR= Hydraulic KB.ELEV= (4000 PSI IS 80%OF PKR RATING)"" BE ELEV= l KOP= 300' Max Angle= 53 deg Datum MD= 35' , 41/2"XO3-112", ID=2.992" Datum ND= 20"CSG,94#,A-55,Welded, ID= 19.124" H 108' 2850' H 3-1/2"HES X NIP, ID=2.813" 9-5/8"CSG,40#,L-80,BTC,ID=8.835" H 4428' 7"CSG,26#,L-80,TC-11, .0383 bpf, ID=6.276" H 5928' I/ GAS LIFT MANDREL 6 16381 I I I MMG I DCR I RK I III I WATER INJECTION MANDRELS Minimum ID = 2.75" @ 6745' ST MD ND DEV TYPE VLV LATCH PORT DATE 3-1/2" HES XN NIPPLE 5 6486 MMG-W DMY RK 4 6525 MMG-W DMY RK 3 6586 MMG-W DMY RK 2 6625 MMG-W DMY RK 1 _6685 _MMG-W_ DMY RK _ 3-1/T TBG, 12.6#L-80,.0087 bpf,w/RA TAG H -6400' I 1 7"CSG 26#,Marker JOINT w/RA TAG ID=6.276"IH -6450' I/41 {� 1C� 6445' I 17" BOT Premier PKR w/1/4"FEED THRU I 6454' ,-j3-1/2"HES X NIP,ID=2.813" I I - 6461' 1 1NDPG,Multi-Drop Pressure Gauge M 6544' 1 7"HES MFA PKR w/1/4"FEED THRU, ID=2.90" REF LOG: SLB Realtime LWD I I — 6554' 1-13-112"HES X NIP,ID=2.813" ANGLE ATTOPPERF: r Note: Refer to Production DB for historical perf data ------1 6570' I I NDPG,Multi-Drop Pressure Gauge SIZE SPF INTERVAL Opn/Sqz DATE 4-1/2" 5 OBa-27' 0 LI 4-1/2" 5 Obc-27' 0 W 4-1/2" 5 OBd-46' 0 6644' I 7"HES MFA PKR w/1/4"FEED THRU,ID=2.90" ' �4K 6653' ,-1 3-1/2"HES X NIP,ID=2.813" I 6660' I INDPG,Single Pressure Gauge I ' 6724' 1-13-1/2"HES X NIP,ID=2.813" 3-1/2"TBG,9.2#,L-80,TC-II, .0087 bpf, ID=2.992" H 6767' I— / \ 6745' -13-1/2"HES XN NIP,ID=2.75" I PBS H I 6917' W•W••�� 6767' 3-1/2"WLEG,ID=2.992" 7"CSG,26#,L-80, BTC-M, .0383 bpf, ID=6.276 H 7007' `4'W•4•OhA V DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 08/04/10 MIS Proposed WBD WELL: W-219i PERMIT No: xxxxx API No: 50-029-xxxxx Sec,Tw p, Rge BP Exploration(Alaska) BP - Alaska Prudhoe Bay PB W Pad Plan W-219 Plan W-219 Plan: W-219 Wp 6.0 Standard Proposal Report 22 July, 2010 HALLIBURTON Sperry Drilling Services Z � r O y N N co. x z U U)Wf- INN I— C1 ili - 0-,)U m E tYY a w LL U (d U V m CO rn t7 t7 C, = CO E3>' d w Zvo 3 al (` 0 N W1 c00= J ��� F"' 4: J QN ��r WK .x+G 3 c - = .,, CO g N E r¢ �¢ °oy°o�� p .cooco Li,_ L N ro ,, 3 °vWI ° } Z COMc7)2 p(oo < 3.00Ud J O 3 \\ Q Q aOCmo� U 2a°o m60� I ,s'%A a mw`(nw v LL .= ..-• —I 0 Z CNN, Q L _ �= • �% 0 m (. �33V L i 0 , z Nuj W I Uv� u E a �^ 11 r M N LL G1 C {�/ Lc N C d 0 N . ��O.O \ 00 Wr2tL Z 6 0 o VG_ � 2......N J A 1 U>2 T6 U b 0 o0 C V _en W V O, _ ° O ) 1' _ N (n q _o t - N el Cn - O 0 ON It O)r CO 13 Ir.N _ CD (O N p - ° ..Ca� G� ° 0 Q. ak -aa °a Q N V • _ l Q Q U.7 41: ? N oa N ✓ ,., [L� • a b —O o . A w N N O 0o rr g rnrn v $ - ° N N A ,.. •I O A \ I mo`-dN 0 2 00 V r CON O( 0)e l N NN- co OOm ),-C)O NO M O r N O UO10Of-ON0�N NNOO) NNM N = \ .� ' a d N r [ \ ■ CO CO tnUU Uf� C \ 000 0000 OO NO NO N-000 NLLCC 0 Cl) COO 0000000)0�00'000 (U()+ + \ CO U)NN 6.°0 0000(OOCJO N000 00 _ W r O r w u0N $Y33 -O b Z 000 000000.-0000000 C O N _0 00 Lb 0000000000 O o O O O M O O O 4 ' F4 \\ m O • O O Vp N C OO O :E CO0 C O 00 0 n N 0' ( N 00)r CO.- LL CO 000 O N O N 66 O N76 > N "I 0- Z (DO J W 0 CO N-.Ns-CO 0000 ii N + 0 n OOCN N N 010010 1 0) 0 U W O QN 0 0)Is (00000o WI N-.-N N NC�N § _ I- ON 00000 O > ��g; W 1 O Z .-.-0 O N.70 N 0 0 N N r + . . . paD0 8 o + A JCO I- w 0 o 333 0 0 O CO Q(+)Oi�00M.-.-NN.7.-�N j- °0 0 0 C C CO > 1- >V 00�a rui cm n n r-:CO W ���� ry V)OOyf-y(p1-cO1-NN1- O a J d Q J O 1- u) N co V.-(h(A00 )O�Na .- N N 7 O N 0 1n r <0 m M 5 000 O C W ,- CO 0 O O N d ZN� 6 N O + OA 000OONN1-.-00N . CpCCOCD 333 J C�W 000000000 O O Ill CO 00) 000 O T •> I- 0000101000. . p O 10 0 Lo0p rp� COO°1010,-.-00)000000 0 r Oc- u.)17) 0010. .-05 CONNOOOO Z0 N N M N 10 N O 0.C O .Z O N-N- 0 rr O8 8 �° Z 00 O(')00001010N.-1-1-r`11• >> 2 ON O 2 a 0 0 N N 4 4 6 O O N r r W NN (7 O O(o.- N.-N OO)0100 + � C)O.-.-ON ON.4.,0,O(0^ L MOr U- I I I I I I I I 1 I I I ■I I I I I CO m OWN(") d N0a O O ° O O O O O O ?O CO�N(70100I�GDO��� N N v b op O Cl WOW(-)141n0S H F m C m mm Z m m N N A > U > m CO H > W J .O O m a U ��„ U O O Q r co,N Q M M M N N r a E Q>`—Q) 22 (00006,6;MO-oripi�)O m U �InU c10im N+ + > .QV)grm COOCN C0nm `n�� N\O m -M MM Q W c_U m N M M M M ULLLL � �� 2 NF W O_ 0000 0 0 N O N 0 r 0 0 0 Q a 00 000 u000000,0,-0QOo0 I- I-. 'a E,°iD m $r33 LLo��ooui000 000 w 1-Q L w2 mL tv)12 0 m F ❑ z O T m j m m00000.-0000000 z mstn Z 0) 000\OtOO\00000000 z in?!C } ❑OON NONOMOM000 d W fn W m M mmm co 00 r No-)ON0mr(p- 0 _U ((IEEE m CONCO J 000)0 N ON CO viON CO fO 0 0 m Q• M 1a- }) Na lloW0MNMMN 2 0 W M a cmm0m ❑ (nOO OOO\Or�u)N NrN 0 0 w o as d Z 00000 (O(p!-.MQ V W 0 2 - > o 000 U ? �pjOm�°mrn co C o 1666 U (0 • o a>a>n>n N »> fn 0 mo r w9.--N N-.-N c H I- O - o 1- 2mm0) >000 ON ui o mrr'rm 0 --- HMOmQrQc0�0�\ON� .0 o O O O —O CO M NNN M Q,M m 0 Q M O(0N Q \ N N - M m N N MIONO 0 0.Q O10-Or r 00000 NOOOaO CO CO 0) C \� 1 ^H , _ 0 OQr 00 o O O CO CO CO CO 0000 \1 O N O 00000000 0 al \1 CO )[) d n')Q1. 2 \ —co LL mot., 00U)' 000ONN0000 1\\\ \\\\\\\\ QOQ NNMMIONQQQQ 1 11\\ \\ \\\\ m a CO o Q ono 0 0 0 N U)CO,--,-r r M / 1 1\\\\ \\ \\\\\\ - 0 m Q 2000 N CO 44066 0 N r r I 1 ) \ \ \ \ `` m ,6000.-rN'Q0(p(OO I \ \ ❑ Mu),-0 ON n MQ ON-o 0 1 C 1 \ \ S .\�` . U)•r CO N CO Q O CO CO r 0 j I 11 \\ ■ \\ ,d.0 1 CD cc' I cct 0),-NMQNCN0)0--.-'-' CO M 1014 1] 2 Z Z\Z 0 CD Z OI O O I O I m I m - - 2 D 001 0 DI�I CO I CO 1 Ica� 0 CO _LO CO D n D cd 0 N o CO n 2 To - O o ° m rn 2 N ° - N CO O CO CO Q O LC) r p C - 0 m 0 CO M W _ N N- O O m N CO - !6 _1 O 0 O CO !n C o O • m O N M co >Q O CO G N W \ -p O co I I 5 ti -1 1 CO 5 0 Q ro m 0 N 1 `O N a U) "m d in > 00 o 0 ) 0 o0 Y CO d I m 2' > N `4`4 (n co 'O O 0 m vv m m n.m- U` mUU , 00 COOOO N N0 0 J CO MM CO W W u)N in 2 z rom m Cr) 0 Q o m00 N JJ ❑ °O OOU r co 0 O- II— 0000 . ovum) � � uNi uNi 0 Zoo N mN 0 rn rn a + + a u u Vi > m m J m r M M m r Q J C O 19 CO CO C Z QQ In 30N W C'06 J W ❑ Q G,SFS w R N N M •C =0 0 r +M M _I A W co. W _,, NC� °� � � 30 ■ L 000. 0 3 ii)mr C 10 J Z C.;a 0 2 ,-- NryN CO 6. t6 lD Q Q ,��U U ZNV 00)0 m�� aaa 'a3 J L Zoo2 < +\pr s06 N Z m V V _ M.M. s 0 m N 04•E t Z N ;tA N T` a z 333 m 0— O i W cm) cm) cm)-g W I o G1 U cccr`, Id o z m m m Z 3 W mmm N N O Lu m`m N O Q QO LL O-'22 p co c; U Q r w W O E= Z 0,7, Z p N r P m•o O 1-1- o'4.6 ---I I I I I I I I I I I I I I I I I I I I I I I I I I I II I 1 1 a r ,,,mm I-MN O A O0 CO 0 r 0 CO LO 0 0 ^ O> (0 E N N V 0) 0 0) co W M co N O Z CO CO CO M 0 ❑ 1 (LI!R4 096) Lodea lea!-an anal • Sperry Drilling • HALLI BU RTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well Plan W-219 Company: BP-Alaska TVD Reference: W-219 D-14 @ 87.1ft(34.3 KB+52.8GL) Project: Prudhoe Bay MD Reference: W-219 D-14 @ 87.1ft(34.3 KB+52.8GL) Site: PB W Pad North Reference: True Well: Plan W-219 Survey Calculation Method: Minimum Curvature Wellbore: Plan W-219 Design: W-219 Wp 6.0 Project Prudhoe Bay,North Slope,UNITED STATES Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB W Pad,TR-11-12 Site Position: Northing: 5,957,194.18 ft Latitude: 70°17'31.506 N From: Map Easting: 609,919.18ft Longitude: 149°6'36.343 W Position Uncertainty: 0.0 ft Slot Radius: 0" Grid Convergence: 0.84 ° rWell Plan W-219 Well Position +NI-S 0.0 ft Northing: 5,959,788.00 ft Latitude: 70°17'56.707 N +E/-W 0.0 ft Easting: 612,049.00 ft Longitude: 149°5 33.150 W Position Uncertainty 0.0 ft Wellhead Elevation: ft Ground Level: 52.8 ft Wellbore Plan W-219 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2009 12/20/2009 22.67 80.88 57,638 Design W-219 Wp 6.0 Audit Notes: Version: Phase: PLAN Tie On Depth: 34.3 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) r) 34.3 0.0 0.0 73.58 Plan Sections Measured Vertical TVD Dogleg Build Turn Depth Inclination Azimuth Depth System +N/S +E/-W Rate Rate Rate Tool Face (ft) (°) (°) (ft) ft (ft) (ft) (°/100ft) (°/100ft) (°1100ft) (°) 34.3 0.00 0.00 34.3 -52.8 0.0 0.0 0.00 0.00 0.00 0.00 300.0 0.00 90.00 300.0 212.9 0.0 0.0 0.00 0.00 0.00 90.00 500.0 5.00 90.00 499.7 412.6 0.0 8.7 2.50 2.50 0.00 90.00 1,162.0 21.55 90.00 1,141.8 1,054.7 0.0 160.2 2.50 2.50 0.00 0.00 1,412.0 21.55 90.00 1,374.3 1,287.2 0.0 252.0 0.00 0.00 0.00 0.00 2,074.5 38.10 93.20 1,947.1 1,860.0 -11.5 580.1 2.51 2.50 0.48 6.92 2,224.5 38.10 93.20 2,065.1 1,978.0 -16.7 672.5 0.00 0.00 0.00 0.00 2,718.2 52.91 93.16 2,410.2 2,323.1 -36.1 1,023.2 3.00 3.00 -0.01 -0.12 4,340.1 52.91 93.16 3,388.2 3,301.1 -107.5 2,315.0 0.00 0.00 0.00 0.00 6,480.1 40.84 0.85 5,017.1 4,930.0 623.2 3,280.9 3.00 -0.56 -4.31 -133.47 6,665.1 40.84 0.85 5,157.1 5,070.0 744.2 3,282.7 0.00 0.00 0.00 0.00 6,757.7 40.84 0.85 5,227.1 5,140.0 804.7 3,283.6 0.00 0.00 0.00 0.00 7,007.7 40.84 0.85 5,416.2 5,329.1 968.2 3,286.1 0.00 0.00 0.00 0.00 7/22/2010 3:25:40PM Page 2 COMPASS 2003.16 Build 73 Sperry Drilling HALLIBURTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well Plan W-219 Company: BP-Alaska TVD Reference: W-219 D-14 @ 87.1ft(34.3 KB+52.8GL) Project: Prudhoe Bay MD Reference: W-219 D-14 @ 87.1ft(34.3 KB+52.8GL) Site: PB W Pad North Reference: True Well: Plan W-219 Survey Calculation Method: Minimum Curvature Wellbore: Plan W-219 Design: W-219 Wp 6.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) -52.80 34.3 0.00 0.00 34.3 -52.8 0.0 0.0 5,959,788.00 612,049.00 0.00 0.00 100.0 0.00 90.00 100.0 12.9 0.0 0.0 5,959,788.00 612,049.00 0.00 0.00 200.0 0.00 90.00 200.0 112.9 0.0 0.0 5,959,788.00 612,049.00 0.00 0.00 300.0 0.00 90.00 300.0 212.9 0.0 0.0 5,959,788.00 612,049.00 0.00 0.00 KOP Start Build 2.50 300.0'MD 387.1 2.18 90.00 387.1 300.0 0.0 1.7 5,959,788.02 612,050.66 2.50 1.59 G1 400.0 2.50 90.00 400.0 312.9 0.0 2.2 5,959,788.03 612,051.18 2.50 2.09 500.0 5.00 90.00 499.7 412.6 0.0 8.7 5,959,788.13 612,057.72 2.50 8.37 600.0 7.50 90.00 599.1 512.0 0.0 19.6 5,959,788.29 612,068.60 2.50 18.81 700.0 10.00 90.00 698.0 610.9 0.0 34.8 5,959,788.52 612,083.81 2.50 33.40 800.0 12.50 90.00 796.0 708.9 0.0 54.3 5,959,788.81 612,103.31 2.50 52.11 900.0 15.00 90.00 893.2 806.1 0.0 78.1 5,959,789.16 612,127.08 2.50 74.91 1,000.0 17.50 90.00 989.2 902.1 0.0 106.1 5,959,789.58 612,155.05 2.50 101.75 1,100.0 20.00 90.00 1,083.9 996.8 0.0 138.2 5,959,790.06 612,187.19 2.50 132.58 1,162.0 21.55 90.00 1,141.8 1,054.7 0.0 160.2 5,959,790.39 612,209.17 2.50 153.67 End Directional 1162.0'MD 1,200.0 21.55 90.00 1,177.2 1,090.1 0.0 174.2 5,959,790.60 612,223.13 0.00 167.06 1,300.0 21.55 90.00 1,270.2 1,183.1 0.0 210.9 5,959,791.14 612,259.85 0.00 202.30 1,318.2 21.55 90.00 1,287.1 1,200.0 0.0 217.6 5,959,791.24 612,266.54 0.00 208.71 SV6 1,400.0 21.55 90.00 1,363.2 1,276.1 0.0 247.6 5,959,791.69 612,296.58 0.00 237.53 1,412.0 21.55 90.00 1,374.3 1,287.2 0.0 252.0 5,959,791.76 612,300.98 0.00 241.76 Start DLS 2.51 1412.0'MD 1,500.0 23.74 90.66 1,455.6 1,368.5 -0.2 285.9 5,959,792.06 612,334.86 2.51 274.20 1,600.0 26.24 91.28 1,546.2 1,459.1 -0.9 328.2 5,959,791.96 612,377.10 2.51 314.51 1,700.0 28.74 91.81 1,634.9 1,547.8 -2.2 374.3 5,959,791.40 612,423.24 2.51 358.41 1,800.0 31.23 92.25 1,721.5 1,634.4 -4.0 424.2 5,959,790.37 612,473.20 2.51 405.81 1,900.0 33.74 92.64 1,805.8 1,718.7 -6.3 477.9 5,959,788.87 612,526.88 2.51 456.63 2,000.0 36.24 92.97 1,887.8 1,800.7 -9.1 535.1 5,959,786.92 612,584.18 2.51 510.77 2,049.2 37.47 93.13 1,927.1 1,840.0 -10.6 564.6 5,959,785.79 612,613.63 2.51 538.56 SV5 2,074.5 38.10 93.20 1,947.1 1,860.0 -11.5 580.1 5,959,785.16 612,629.12 2.51 553.17 End Directional 2074.5'MD-Base Permafrost 2,100.0 38.10 93.20 1,967.2 1,880.1 -12.4 595.8 5,959,784.52 612,644.87 0.00 568.01 2,200.0 38.10 93.20 2,045.9 1,958.8 -15.8 657.4 5,959,781.99 612,706.51 0.00 626.14 2,224.5 38.10 93.20 2,065.2 1,978.1 -16.7 672.5 5,959,781.37 612,721.62 0.00 640.38 Start DLS 3.00 2224.5'MD 2,233.3 38.37 93.20 2,072.1 1,985.0 -17.0 678.0 5,959,781.15 612,727.07 3.01 645.52 SV4 2,300.0 40.37 93.19 2,123.6 2,036.5 -19.3 720.2 5,959,779.42 612,769.32 3.00 685.36 2,400.0 43.37 93.18 2,198.1 2,111.0 -23.0 786.8 5,959,776.70 612,835.99 3.00 748.22 2,500.0 46.37 93.18 2,269.0 2,181.9 -26.9 857.2 5,959,773.84 612,906.46 3.00 814.67 2,600.0 49.37 93.17 2,336.1 2,249.0 -31.0 931.3 5,959,770.85 612,980.55 3.00 884.53 2,700.0 52.37 93.16 2,399.2 2,312.1 -35.3 1,008.7 5,959,767.72 613,058.04 3.00 957.60 7/22/2010 3:25:40PM Page 3 COMPASS 2003.16 Build 73 Sperry Drilling HALLIBURTOIi Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well Plan W-219 Company: BP-Alaska TVD Reference: W-219 D-14 @ 87.1ft(34.3 KB+52.8GL) Project: Prudhoe Bay MD Reference: W-219 D-14 @ 87.1ft(34.3 KB+52.8GL) Site: PB W Pad North Reference: True Well: Plan W-219 Survey Calculation Method: Minimum Curvature Wellbore: Plan W-219 Design: W-219 Wp 6.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ff) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 2,323.11 2,718.2 52.91 93.16 2,410.2 2,323.1 -36.1 1,023.2 5,959,767.14 613,072.49 3.00 971.23 End Directional 2718.2'MD 2,800.0 52.91 93.16 2,459.5 2,372.4 -39.7 1,088.3 5,959,764.51 613,137.68 0.00 1,032.71 2,900.0 52.91 93.16 2,519.8 2,432.7 -44.1 1,168.0 5,959,761.30 613,217.38 0.00 1,107.87 2,986.7 52.91 93.16 2,572.1 2,485.0 -47.9 1,237.0 5,959,758.52 613,286.46 0.00 1,173.01 SV3 3,000.0 52.91 93.16 2,580.1 2,493.0 -48.5 1,247.6 5,959,758.09 613,297.09 0.00 1,183.03 3,100.0 52.91 93.16 2,640.4 2,553.3 -52.9 1,327.3 5,959,754.88 613,376.79 0.00 1,258.19 3,200.0 52.91 93.16 2,700.7 2,613.6 -57.3 1,406.9 5,959,751.67 613,456.49 0.00 1,333.36 3,300.0 52.91 93.16 2,761.0 2,673.9 -61.7 1,486.6 5,959,748.46 613,536.19 0.00 1,408.52 3,334.9 52.91 93.16 2,782.1 2,695.0 -63.3 1,514.4 5,959,747.34 613,564.01 0.00 1,434.76 SV2 3,400.0 52.91 93.16 2,821.4 2,734.3 -66.1 1,566.2 5,959,745.25 613,615.89 0.00 1,483.68 3,500.0 52.91 93.16 2,881.7 2,794.6 -70.5 1,645.9 5,959,742.04 613,695.59 0.00 1,558.84 3,600.0 52.91 93.16 2,942.0 2,854.9 -74.9 1,725.5 5,959,738.83 613,775.29 0.00 1,634.00 3,700.0 52.91 93.16 3,002.3 2,915.2 -79.3 1,805.2 5,959,735.62 613,854.99 0.00 1,709.16 3,800.0 52.91 93.16 3,062.6 2,975.5 -83.7 1,884.8 5,959,732.41 613,934.69 0.00 1,784.32 3,873.9 52.91 93.16 3,107.1 3,020.0 -87.0 1,943.6 5,959,730.04 613,993.56 0.00 1,839.83 SV1 3,900.0 52.91 93.16 3,122.9 3,035.8 -88.1 1,964.5 5,959,729.20 614,014.39 0.00 1,859.48 4,000.0 52.91 93.16 3,183.2 3,096.1 -92.5 2,044.1 5,959,725.99 614,094.09 0.00 1,934.64 4,100.0 52.91 93.16 3,243.5 3,156.4 -96.9 2,123.8 5,959,722.78 614,173.79 0.00 2,009.80 4,200.0 52.91 93.16 3,303.8 3,216.7 -101.3 2,203.4 5,959,719.57 614,253.49 0.00 2,084.96 4,300.0 52.91 93.16 3,364.1 3,277.0 -105.7 2,283.1 5,959,716.36 614,333.19 0.00 2,160.12 4,340.1 52.91 93.16 3,388.3 3,301.2 -107.5 2,315.0 5,959,715.07 614,365.15 0.00 2,190.26 Start DLS 3.00 4340.1'MD 4,400.0 51.69 91.50 3,424.9 3,337.8 -109.4 2,362.4 5,959,713.85 614,412.52 3.00 2,235.14 4,427.6 51.13 90.71 3,442.1 3,355.0 -109.8 2,383.9 5,959,713.75 614,434.09 3.00 2,255.70 9 5/8" 4,474.9 50.19 89.34 3,472.1 3,385.0 -109.8 2,420.5 5,959,714.28 614,470.68 3.00 2,290.81 UG4 4,500.0 49.70 88.60 3,488.2 3,401.1 -109.5 2,439.7 5,959,714.91 614,489.87 3.00 2,309.31 4,506.0 49.58 88.42 3,492.1 3,405.0 -109.4 2,444.3 5,959,715.10 614,494.41 3.00 2,313.70 UG4A 4,600.0 47.79 85.52 3,554.2 3,467.1 -105.7 2,514.8 5,959,719.86 614,564.85 3.00 2,382.39 4,700.0 45.96 82.26 3,622.6 3,535.5 -97.9 2,587.3 5,959,728.67 614,637.27 3.00 2,454.17 4,800.0 44.23 78.79 3,693.2 3,606.1 -86.3 2,657.2 5,959,741.33 614,706.93 3.00 2,524.45 4,900.0 42.62 75.12 3,765.8 3,678.7 -70.8 2,724.1 5,959,757.81 614,773.63 3.00 2,593.05 5,000.0 41.13 71.22 3,840.3 3,753.2 -51.5 2,788.0 5,959,778.04 614,837.20 3.00 2,659.76 5,015.7 40.90 70.58 3,852.1 3,765.0 -48.2 2,797.7 5,959,781.56 614,846.87 3.00 2,670.04 UG3 5,100.0 39.77 67.09 3,916.4 3,829.3 -28.5 2,848.6 5,959,801.99 614,897.46 3.00 2,724.42 5,200.0 38.58 62.73 3,993.9 3,906.8 -1.7 2,905.8 5,959,829.59 614,954.24 3.00 2,786.84 5,300.0 37.55 58.16 4,072.7 3,985.6 28.6 2,959.4 5,959,860.75 615,007.39 3.00 2,846.85 5,400.0 36.71 53.39 4,152.4 4,065.3 62.5 3,009.3 5,959,895.40 615,056.76 3.00 2,904.28 7/22/2010 3:25:40PM Page 4 COMPASS 2003.16 Build 73 Sperry Drilling HALLIBURTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well Plan W-219 Company: BP-Alaska TVD Reference: W-219 D-14 @ 87.1ft(34.3 KB+52.8GL) Project: Prudhoe Bay MD Reference: W-219 D-14 @ 87.1ft(34.3 KB+52.8GL) Site: PB W Pad North Reference: True Well: Plan W-219 Survey Calculation Method: Minimum Curvature Wellbore: Plan W-219 Design: W-219 Wp 6.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) C) (°) (ft) ft (ft) (ft) (ft) (ft) 4,145.83 5,500.0 36.06 48.45 4,232.9 4,145.8 99.9 3,055.3 5,959,933.43 615,102.22 3.00 2,958.99 5,600.0 35.63 43.38 4,314.0 4,226.9 140.6 3,097.4 5,959,974.75 615,143.64 3.00 3,010.82 5,616.1 35.57 42.55 4,327.1 4,240.0 147.5 3,103.7 5,959,981.71 615,149.93 3.00 3,018.88 UG1 5,700.0 35.40 38.23 4,395.4 4,308.3 184.5 3,135.3 5,960,019.25 615,180.92 3.00 3,059.62 5,800.0 35.40 33.05 4,476.9 4,389.8 231.6 3,169.0 5,960,066.79 615,213.93 3.00 3,105.27 5,900.0 35.62 27.89 4,558.4 4,471.3 281.6 3,198.4 5,960,117.25 615,242.61 3.00 3,147.64 5,929.2 35.73 26.40 4,582.1 4,495.0 296.8 3,206.2 5,960,132.52 615,250.16 3.00 3,159.38 UG_Ma 5,984.7 35.98 23.59 4,627.1 4,540.0 326.2 3,219.9 5,960,162.19 615,263.45 3.00 3,180.88 UG_Mb1 6,000.0 36.06 22.82 4,639.4 4,552.3 334.5 3,223.5 5,960,170.49 615,266.86 3.00 3,186.61 6,046.7 36.33 20.50 4,677.1 4,590.0 360.1 3,233.7 5,960,196.24 615,276.65 3.00 3,203.60 UG_Mb2 6,100.0 36.70 17.88 4,720.0 4,632.9 390.1 3,244.1 5,960,226.36 615,286.63 3.00 3,222.07 6,146.4 37.07 15.65 4,757.1 4,670.0 416.7 3,252.1 5,960,253.15 615,294.26 3.00 3,237.32 UG_Mc 6,200.0 37.55 13.11 4,799.7 4,712.6 448.2 3,260.2 5,960,284.72 615,301.85 3.00 3,253.94 6,228.3 37.82 11.80 4,822.1 4,735.0 465.1 3,263.9 5,960,301.65 615,305.33 3.00 3,262.28 SB_Na 6,253.6 38.07 10.63 4,842.1 4,755.0 480.4 3,266.9 5,960,316.99 615,308.13 3.00 3,269.51 SB_Nb 6,298.2 38.55 8.62 4,877.1 4,790.0 507.6 3,271.6 5,960,344.32 615,312.34 3.00 3,281.65 SB_Nc 6,300.0 38.57 8.54 4,878.5 4,791.4 508.7 3,271.7 5,960,345.40 615,312.49 3.00 3,282.11 6,311.0 38.70 8.05 4,887.1 4,800.0 515.5 3,272.7 5,960,352.24 615,313.38 3.00 3,285.00 SB_Na 6,400.0 39.77 4.18 4,956.0 4,868.9 571.5 3,278.7 5,960,408.24 615,318.51 3.00 3,306.52 6,427.5 40.13 3.02 4,977.1 4,890.0 589.1 3,279.8 5,960,425.87 615,319.36 3.00 3,312.57 SB_OA 6,480.1 40.84 0.85 5,017.1 4,930.0 623.2 3,280.9 5,960,460.00 615,320.00 3.00 3,323.31 End Directional 6480.1'MD-W-219 T1 6,493.3 40.84 0.85 5,027.1 4,940.0 631.8 3,281.1 5,960,468.64 615,320.00 0.00 3,325.88 SB_OBa 6,500.0 40.84 0.85 5,032.2 4,945.1 636.2 3,281.1 5,960,473.02 615,320.00 0.00 3,327.18 6,533.0 40.84 0.85 5,057.1 4,970.0 657.8 3,281.5 5,960,494.57 615,320.00 0.00 3,333.58 SB_OBb 6,599.1 40.84 0.85 5,107.1 5,020.0 701.0 3,282.1 5,960,537.79 615,320.00 0.00 3,346.41 SB_OBc 6,600.0 40.84 0.85 5,107.8 5,020.7 701.6 3,282.1 5,960,538.41 615,320.00 0.00 3,346.59 6,665.1 40.84 0.85 5,157.1 5,070.0 744.2 3,282.7 5,960,581.00 615,320.00 0.00 3,359.24 SB_OBd-W-219 T2 6,700.0 40.84 0.85 5,183.5 5,096.4 767.0 3,283.1 5,960,603.79 615,320.00 0.00 3,366.01 6,757.7 40.84 0.85 5,227.1 5,140.0 804.7 3,283.6 5,960,641.50 615,320.00 0.00 3,377.20 SB_OBe 6,800.0 40.84 0.85 5,259.1 5,172.0 832.4 3,284.1 5,960,669.18 615,320.00 0.00 3,385.42 7/22/2010 3:25:40PM Page 5 COMPASS 2003.16 Build 73 Sperry Drilling HALLIBURTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well Plan W-219 Company: BP-Alaska TVD Reference: W-219 D-14 @ 87.1ft(34.3 KB+52.8GL) Project: Prudhoe Bay MD Reference: W-219 D-14 @ 87.1ft(34.3 KB+52.8GL) Site: PB W Pad North Reference: True Well: Plan W-219 Survey Calculation Method: Minimum Curvature Wellbore: Plan W-219 Design: W-219 Wp 6.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDes +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 5,180.00 6,810.5 40.84 0.85 5,267.1 5,180.0 839.3 3,284.2 5,960,676.07 615,320.00 0.00 3,387.47 SB_OBf 6,876.6 40.84 0.85 5,317.1 5,230.0 882.5 3,284.8 5,960,719.29 615,320.00 0.00 3,400.30 Base_SB_OBf 6,900.0 40.84 0.85 5,334.8 5,247.7 897.8 3,285.0 5,960,734.57 615,320.00 0.00 3,404.84 7,000.0 40.84 0.85 5,410.4 5,323.3 963.2 3,286.0 5,960,799.96 615,320.00 0.00 3,424.25 7,007.0 40.84 0.85 5,415.7 5,328.6 967.7 3,286.1 5,960,804.53 615,320.00 0.00 3,425.61 7" 7,007.7 40.84 0.85 5,416.2 5,329.1 968.2 3,286.1 5,960,804.97 615,320.00 0.00 3,425.74 Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing Easting -Shape (") (") (ft) (ft) (ft) (ft) (ft) W-219 T1 0.00 0.00 5,017.1 623.2 3,280.9 5,960,460.00 615,320.00 -plan hits target center -Circle(radius 100.0) W-219 T2 0.00 0.00 5,157.1 744.2 3,282.7 5,960,581.00 615,320.00 -plan hits target center -Circle(radius 100.0) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (_) (••) 7,007.0 5,415.7 7" 7 8-3/4 4,427.6 3,442.1 9 5/8" 9-5/8 12-1/4 7/22/2010 3:25:40PM Page 6 COMPASS 2003.16 Build 73 Sperry Drilling HALLIBURTOIN Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well Plan W-219 Company: BP-Alaska ND Reference: W-219 D-14 @ 87.1ft(34.3 KB+52.8GL) Project: Prudhoe Bay MD Reference: W-219 D-14 @ 87.1ft(34.3 KB+52.8GL) Site: PB W Pad North Reference: True Well: Plan W-219 Survey Calculation Method: Minimum Curvature Wellbore: Plan W-219 Design: W-219 Wp 6.0 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (ft) (ft) ft Name Lithology (°) (') 6,493.3 5,027.1 SBOBa 5,984.7 4,627.1 UGMb1 4,474.9 3,472.1 UG4 3,334.9 2,782.1 SV2 3,873.9 3,107.1 SV1 2,233.3 2,072.1 SV4 6,599.1 5,107.1 SB_OBc 6,427.5 4,977.1 SB_OA 6,533.0 5,057.1 SB_OBb 6,298.2 4,877.1 SB_Nc 6,876.6 5,317.1 Base SBOBf 2,074.5 1,947.1 Base Permafrost 6,146.4 4,757.1 UG_Mc 6,810.5 5,267.1 SB_OBf 2,986.7 2,572.1 SV3 4,506.0 3,492.1 UG4A 6,046.7 4,677.1 UG_Mb2 6,253.6 4,842.1 SBNb 1,318.2 1,287.1 SV6 6,757.7 5,227.1 SB_OBe 387.1 387.1 G1 5,929.2 4,582.1 UG_Ma 5,015.7 3,852.1 UG3 6,311.0 4,887.1 SB_Ne 2,049.2 1,927.1 SV5 6,228.3 4,822.1 SB_Na I 6,665.1 5,157.1 SB_OBd 5,616.1 4,327.1 UG1 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (ft) (ft) (ft) (It) Comment 300.0 300.0 0.0 0.0 KOP Start Build 2.50 300.0'MD 1,162.0 1,141.8 0.0 160.2 End Directional 1162.0'MD i 1,412.0 1,374.3 0.0 252.0 Start DLS 2.51 1412.0'MD 2,074.5 1,947.1 11.5 580.1 End Directional 2074.5'MD 2,224.5 2,065.2 -16.7 672.5 Start DLS 3.00 2224.5'MD 2,718.2 2,410.2 -36.1 1,023.2 End Directional 2718.2'MD 4,340.1 3,388.3 -107.5 2,315.0 Start DLS 3.00 4340.1'MD 6,480.1 5,017.1 623.2 3,280.9 End Directional 6480.1'MD 7,007.7 5,416.3 968.2 3,286.1 TD at 7007.7'MD 7/22/2010 3:25:40PM Page 7 COMPASS 2003.16 Build 73 N_ J N m O O O m co Y . °to°oa2g)omtt�oo°m°1P1,. N6-63y23 NN Omtp cn A A I yy pNm nm0hm d 0_ t NNmtANMMM; O In tU0 OON �Or000 'N yr2 M ,,0 a� Wogoorng oa000 O, o m U 0go0td0cj0�000 # 'RI 11 N Y Y /,' s - 00 x 0 0.-0 0 0 0 0 O C ' L N O O N O m O O O O O O O Ws p / QG�fVGnjOP'>C t7CCG r - 0 z @J _U U 3�o°neMi�nvNOaronN 2=r O N - > J }�trc ccD M Or,-O Oaf 5OOtyy;coca =� Q __ .�{ ce) O 2_ F NNNNNfm 43333 <? a0 �7h1 `17 ,_ W ()NNNNOFODUNOr ..-J S fit fNi fik „ V 1 ' 0 mmmm .0".�mmam 2NNNN,-)ri0vivittil:C N +jam+ p - y_ •j114. H +o ooOVWM.NNcOoe - 3 0 2am�r0mD P` ♦�,• ti '1������1111 �i NNNNNNNNt+IMMM vr mYmY E �: ariee'�. �O�iyEi 0 00,-03.-0 Mo°oamomOM 2MZ'' o d CO. � 'a`i1•� �y'�� yr w �tov,v,om 4 co -01.j A �y (s 4- �T+ rn—vD oiat'24°' O'rSa Vpp...•N....2 I �1 .10 "-- F rnvr 09 A2�NN3 d �AS � a�N�p�� /l i`i'� (,�� // �e�- �NNMIOII NINO� V) W N_ I- ;yr�,Nry�U 1) 4IS1 .L. Q E _ _ NOOppo O tOtONNNN t0 co V�.IJ= p` 1 - to `p 7O QOpOOONN�-SOD OII fO0• N 0 0N`.'N C M ( \�., !� '. / N E 000Mmmm00000%Z Coo in (7S f -/,,, �`_/ 6 000.0i,,000.-sae yy yy yy i s}e� °° W v J U U 8 i _ N L O W m m N N L m c y ON N N 00 NN 0000 Y r - C C C C L 1 N N t0 M N N a<V V i§ 6 EEEEi - _ — / 1 c 0Og000OOOOOOO N d2rti O i O M OONNN�'-�-rl� 2"'K o2�C c M N m"—.V—",......,NOVto00t ,..:: O * 0 U — cc 3a0 aq s N. a N-.NNN 0)0)00 ,I=. r O' N N N N m m m r 17 r d c 0. C 0 + U.)1 g C _m V -.Cg D d N N M a N m r m m N w 4+N O O pN N pp O O IN N O N N r O CO 0 N N O N O N — N N •- s- ,- .- N N N N M M st a N N (O . r r 0 O U A288 ,28282828 O O O O O O O O C N o o N o r O N N r O N pp N O CO O N 0 C — — — — N N N N VI CO V O CO N CO CD N- u_ ET; N t 3 O 0 8 0 .. c� N°rna e� R N rp m_ O Z Z o c N L C CO++ O C� N_[00 eI - y---(/yl ce N N0 Nrnr L. k.4. O p on 0k,_ o ._ `� L i a E ^ n T# U e0 y Z -0°°N m zw 8 °C7 P c ¢ /, i C w • O L J 10 d O r 1 N 19j 0 c O m . . . Ipvt° I� o� yr' - u / / v� r °m aN N N :*;1--._ ti� h '/j pk\ 4 —, �3 i. ES Pte. / ' _ -1.. �- _i 7 5 000 / w' �T E_y ' a333 Z i. / I J 3 I li vv/4-10.-4:, ��15��y< I % 1 L 2 chi c.w 01 ON ON..o io Z i t \�`�i I .S W LN NN CO Z .L o 4 = .I Nii'P.. i ' li C rn333 CO 0 -8) t� N.---1",.....\ ) .41';-j ��� l;'�, � )/ N vii h =000".t:,-,,, v/�-1���v; i��\��:a '. {/i ∎{Ill I e soot)r; Q E0 TO ; �4-t; 1\ \ 1y.10 'F ' x.44 i ,' oo cvoieoo —Hwy �'�.��11 1 � ) 1 R r` o O pp O cd A d 7 r 3 m -imp ,1..... ✓ N R OMOO Z C�r2N2 i 1 � '.'` -_ A S QQ 3 g/I I i 0 a E a N m c ° 3 3 0 0 N BPPASSPORT • Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Site PB W Pad Project: Prudhoe Bay TVD Reference: W-219 @87.1'(34.3'KB+52.8'GL)@ 87.10ft(RKB @f Reference Site: PB W Pad MD Reference: W-219 @87.1'(34.3'KB+52.8'GL)@ 87.10ft(RKB @f Site Error: 0.00ft North Reference: True Reference Well: Plan W-219 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan W-219 Database: EDM.16-Anc Prod-WH24P Reference Design: W-219 WP6.0 Offset TVD Reference: Offset Datum Reference W-219 WP6.0 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 34.30 to 7,007.70ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 897.34ft Error Surface: Elliptical Conic Survey Tool Program Date 7/22/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 34.30 500.00 W-219 WP6.0(Plan W-219) GYD-GC-SS Gyrodata gyro single shots 500.00 4,428.00 W-219 WP6.0(Plan W-219) MWD+IFR+MS MWD+IFR+Multi Station 4,428.00 7,007.70 W-219 WP6.0(Plan W-219) MWD+IFR+MS MWD+IFR+Multi Station 7/22/2010 4:27:47PM Page 2 of 5 COMPASS 2003.16 Build 71 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Site PB W Pad Project: Prudhoe Bay TVD Reference: W-219 @87.1'(34.3'KB+52.8'GL)@ 87.10ft(RKB @E Reference Site: PB W Pad MD Reference: W-219 @87.1'(34.3'KB+52.8'GL)@ 87.10ft(RKB @E Site Error: 0.00ft North Reference: True Reference Well: Plan W-219 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan W-219 Database: EDM .16-Anc Prod-WH24P Reference Design: W-219 WP6.0 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB W Pad Plan W-202-Plan W-202 OBd-Plan#6 W-202 0 752.38 750.00 35.34 13.51 21.93 Pass-Major Risk Plan W-202-Plan W-202L1 OBc-Plan#6 W-202 752.38 750.00 35.34 13.51 21.93 Pass-Major Risk Plan W-202-Plan W-202L2 OBa-Plan#6 W-202 752.38 750.00 35.34 13.51 21.93 Pass-Major Risk k Plan W-220-Plan W-220-Plan#8 W-220 355.37 350.00 124.08 6.79 117.30 Pass-Major Risk Plan W-221 -Plan W-221 -Plan#5 W-221 330.03 325.00 168.83 6.17 162.67 Pass-Major Risk Plan W-223-Plan W-223-W-223 Wp7.Oa 350.97 350.00 108.89 7.65 101.24 Pass-Major Risk W-17-W-17-W-17 553.09 550.00 300.81 9.74 291.07 Pass-Major Risk t W-18-W-18-W-18 601.75 600.00 266.38 10.96 255.41 Pass-Major Risk W-19-Plan W-19B-W-19B Wp16 521.96 525.00 229.61 9.21 220.40 Pass-Major Risk W-19-Plan W-19BL1 -W-19BL1 Wp14 521.96 525.00 229.61 9.21 220.40 Pass-Major Risk W-19-Plan W-19BL1PB1 -W-19BL1PB1 Wp7.0 528.85 525.00 229.71 9.30 220.41 Pass-Major Risk W-19-W-19-W-19 519.89 525.00 229.58 9.02 220.56 Pass-Major Risk W-19-W-19A-W-19A 526.88 525.00 229.68 9.12 220.56 Pass-Major Risk W-19-W-19AL1 -W-19AL1 526.88 525.00 229.68 9.12 220.56 Pass-Major Risk W-19-W-19AL1PB1 -W-19AL1PB1 526.88 525.00 229.68 9.12 220.56 Pass-Major Risk W-19-W-19AL1 PB2-W-19AL1 PB2 526.88 525.00 229.68 9.12 220.56 Pass-Major Risk W-19_DIMS-W-19-W-19 519.89 525.00 229.58 9.18 220.40 Pass-Major Risk W-19_DIMS-W-19A-W-19A 526.88 525.00 229.68 9.28 220.41 Pass-Major Risk W-19_DIMS-W-19AL1 -W-19AL1 526.88 525.00 229.68 9.28 220.41 Pass-Major Risk W-19_DIMS-W-19AL1 PB1 -W-19AL1 PB1 526.88 525.00 229.68 9.28 220.41 Pass-Major Risk W-19_DIMS-W-19AL1 PB2-W-19AL1 PB2 526.88 525.00 229.68 9.28 220.41 Pass-Major Risk W-19_DIMS-W-19B-W-19B Wp16 521.96 525.00 229.61 9.21 220.40 Pass-Major Risk W-19_DIMS-W-19BL1 -W-19BL1 Wp15 521.96 525.00 229.61 9.21 220.40 Pass-Major Risk W-19_DIMS-W-19BL1PB1 -W-19BL1PB1 Wp10 521.96 525.00 229.61 9.21 220.40 Pass-Major Risk W-20-W-20-W-20 528.25 525.00 194.16 8.96 185.20 Pass-Major Risk W-200-W-200-W-200 328.94 325.00 18.58 5.88 12.71 Pass-Major Risk W-200-W-200PB1 -W-200PB1 328.94 325.00 18.58 5.88 12.71 Pass-Major Risk W-201 -W-201 -W-201 430.28 425.00 19.95 7.31 12.66 Pass-Major Risk W-201_DIMS-W-201 -W-201 87.09 87.10 5.93 1.55 4.38 Pass-Major Risk W-204-W-204-W-204 504.62 500.00 46.74 9.74 37.01 Pass-Major Risk W-204-W-204L1 -W-204L1 504.62 500.00 46.74 9.74 37.01 Pass-Major Risk W-204-W-204L2-W-204L2 504.62 500.00 46.74 9.74 37.01 Pass-Major Risk W-204-W-204PB1 -W-204PB1 504.62 500.00 46.74 9.74 37.01 Pass-Major Risk W-21 -Plan 6,W-21AL1 -Plan 6 602.33 600.00 160.49 13.69 146.80 Pass-Major Risk W-21 -Plan 6,W-21AL1-01 -Plan 6 602.33 600.00 160.49 13.69 146.80 Pass-Major Risk W-21 -W-21 -W-21 593.23 600.00 160.26 13.31 146.96 Pass-Major Risk W-21 -W-21A-W-21A 602.33 600.00 160.49 13.54 146.95 Pass-Major Risk W-213-W-213-W-213 355.37 350.00 64.13 6.45 57.68 Pass-Major Risk W-214-W-214-W-214 804.33 800.00 77.89 15.86 62.04 Pass-Major Risk W-214_DIMS-W-214-W-214 87.11 87.10 77.91 1.55 76.36 Pass-Major Risk W-215-W-215-W-215 1,772.61 1,800.00 354.50 38.74 317.78 Pass-Major Risk W-216-W-216-W-216 355.07 350.00 93.54 6.87 86.67 Pass-Major Risk W-216_DIMS-W-216-W-216 87.11 87.10 92.55 1.55 91.00 Pass-Major Risk W-217-W-217-W-217 354.87 350.00 138.84 5.72 133.16 Pass-Major Risk W-217-W-217PB1 -W-217PB1 354.87 350.00 138.84 5.83 133.05 Pass-Major Risk W-217_DIMS-W-217-W-217 87.12 87.10 137.58 1.55 136.03 Pass-Major Risk W-217_DIMS-W-217PB1 -W-217 PB1 87.12 87.10 137.58 1.55 136.03 Pass-Major Risk W-218-W-218-W-218 255.24 250.00 153.86 4.36 149.57 Pass-Major Risk W-218_DIMS-W-218-W-218 87.12 87.10 152.59 1.55 151.04 Pass-Major Risk W-22-W-22-W-22 503.33 500.00 125.75 9.60 116.15 Pass-Major Risk W-23-W-23-W-23 520.02 525.00 91.19 11.66 79.53 Pass-Major Risk W-23-W-23A-W-23A 528.14 525.00 91.39 11.86 79.53 Pass-Major Risk W-23A DIMS-W-23A-W-23A 87.09 87.10 87.19 1.55 85.64 Pass-Major Risk 7/22/2010 4:27:47PM Page 3 of 5 COMPASS 2003.16 Build 71 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Site PB W Pad Project: Prudhoe Bay TVD Reference: W-219 @87.1'(34.3'KB+52.8'GL)@ 87.10ft(RKB @t Reference Site: PB W Pad MD Reference: W-219 @87.1'(34.3'KB+52.8'GL)@ 87.10ft(RKB@E Site Error: 0.00ft North Reference: True Reference Well: Plan W-219 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan W-219 Database: EDM .16-Anc Prod-WH24P Reference Design: W-219 WP6.0 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB W Pad W-24-W-24-W-24 354.69 350.00 53.24 6.39 46.85 Pass-Major Risk W-56-W-56-W-56 1,422.12 1,450.00 275.82 23.74 252.82 Pass-Major Risk 7/22/2010 4:27:47PM Page 4 of 5 COMPASS 2003.16 Build 71 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Site PB W Pad Project: Prudhoe Bay ND Reference: W-219 @87.1'(34.3'KB+52.8'GL)©87.10ft(RKB @E Reference Site: PB W Pad MD Reference: W-219 @87.1'(34.3'KB+52.8'GL)©87.10ft(RKB @E Site Error: 0.00ft North Reference: True Reference Well: Plan W-219 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan W-219 Database: EDM .16-Anc Prod-WH24P Reference Design: W-219 WP6.0 Offset TVD Reference: Offset Datum Reference Depths are relative to W-219 @87.1'(34.3'KB+52.8'GL) Coordinates are relative to: PB W Pad Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.000 W° Grid Convergence at Surface is:0.85° Ladder I I I Plot I - 1000 I 1 1 1 I 1 I I I 1 I I I I I I I I t, - J _ _ __ _1 __ _ _ J_ _I _ _ I :1 I t: .,N I I I I . •i. o !,i I I t:6 I I 750 1' 1 1 11 I I I I r I I ' 1�1! 1 1 I I I Ry. ii 1 , h: I I I I i. 1•'• ,;. I I I I 500 � 9 ' •I ' I I I I 1 J + J J J I 1 4 I i 1 I o r, J I 1 1 1 C . � I I I 1 m F.1` P�. 4 Q 250 � F h'' 'It J le„ I 1 I I � I I 1 I /r.- Y I I I I I I _ �j�r_, I I 'a3 1 (LEGEND I I 0 1 � I 202,P Ian W-2020 @d,Plan NBW-202 011AU o-- W-WRS}1S,W-19AL1PB4. 9AL1 P01 V3 6000 W-2T , '214,W-214V169000 202,Plan W-202L10Bc,PIanNBW-202L10BcVD 101-19_01VIS,tot-&cL1rel2D®ptU.(15®fl lrl) W-214_DMS,W-214,W-214VD 204,PlanW-202L20Ba,PbnN6W-202L20BaV0 —0— W-19 DMS,W-19B,W-19BWp16V1 W-215.W-215.W-215V7 223,PlanW-220.PIaninW-220 b0 -a- W-19_DMS,W-19 BL1,W-19BL1 Wp15 VI -a,— W-218.W-216.W-216 V7 221,PUnW-221,Plan N5W-221 VD W-19_DMS.W19 BLIP BI,W-19BL1PBI5 10 V1 W-216_0MS,W-216,W-216 VD 223,Plan W-223,W223 Wp7Da 0 —2- W-20,W-20.W-20 V2 W-217,W-217.W-217 VD I-1 7,W-17 V4 -e-- W-200.W-200,W-200 V2 W-2 17,W-217P B1,W-217P B 1 VO I-13,W-18 V2 W-200.W-200 P B 1,W-200P B1 V11 —X— W-217_0 MS,W-217,W-217 VD Ian W-19B,W-151BWp16V1 —AL— W-201,W-201,W-201 V4 —it- W-217_DMS,W-217PB1,W-217 PB1t..0 anW-19BL1,W-19BL1 Wp14V1 -.- W-201_0MS,W-201.W-201 V0 —1a.- W-218,W-218,W-218 V1 anW-19BL1P81,W-19BL1PB1Wp7DV1 — W-204.W-204,W-204 V2 W-218_13MS,W-218,W-218 VD 413,W-19V3 -}E W-204,W-204L1,W-204 L1 VB - --- W-22,W-22,W-22 V2 r-1 DA.W-19AV3 - - W-204,W-204L2,W-204L2VB W-23,W-23,W-23 V5 '-19ALI,Lu-I9ALI v4 . . .1 - — 7/22/2010 4:27:47PM Page 5 of 5 COMPASS 2003.16 Build 71 . - - __ .. ,... . . ' •'''' . ■ i 0 f.I ' -•• v. a-; 1-• Zi. ,..,—°-.. E-I C....ai It c.i it,Ii:t■ -Ai M __ . ,7■.-: LIS -7X 1--...- '.2. L.- Ir.. 3.1 ■---1 4, rg I ,4..; 1 ' —.:;:-.-. J . }) V•-• -,. , . ,_ iiL_ , 1 , 1 , . 1 A r, ■•■ % t ',..../I . .-: -1 i H1111111;11‘ i 11110013 AE, 11111111111111011-41: r'',• , '1 I I It -._, 4:,I.-,■ -,/..\- ,, r r ,,.---" IL F.: • - ' 7. /-1, 4 ,1;r ,) ■r.: .1.., —IT I : ,. _ I I\ ..L-...-.. _ 7 ..-. (.9 ■., '-_( _. — , ,.-. - --, ... -1.,-. ,.... ..(:. --i, •,..• z cl:,i,•it-'...• ._,,. -I' - .. - i . , i 1 't•Q.' k '..1; r - ..•;., .P. . §.• r i ' _ •,'• z , Ls 0 .• I %; -' :' '' ' - I ! i- , l ':ii:::)'-- 1-- I _.1 , ... z.7.7i -., r.------''i e. • ''.,'7.'71' 1 i • r i-fr:..r, , 1 i ,...r..L.,. I 'i r"--1 d .,4•• '1 t .." I r:tcr -1-11,1- l'oN1 L. I I . '.g ! -.. •:`' (7 q • I , ! ,4. ,._ , .. • _ _, _. i 1 '1, - — s— — — • i 1 _ I ,..... i_ J 1 I „....-..,a, LI ' I p I r; I _ I . (.4 i 2c5 > c -,-. 0 Q. 0 1., s. , is 2 c. .. . t 1 (1)— c UJ 0 x _ .41r t co 13. E 1 E r9.. Ililliiii,_ 0 , Illik di 0 4, ilk a Mr ""11111 ! k 4k CD 4, \ lilt , . t oft i 1 ..., v, \ 1I■ a) a) > c INA 0 irli E ii. ..7i 111■11....... Ebb dos IL 50- 11110%.9 i 1 V AR Olk ."1"eill 1 ANN. ...• kin e Mr 0 0 S /PI 4k _ A a Jr 19 I At t 111 4111k > c el, AV 0 :I _ .... m o o 0 > V ...J ■7 " .7 X 1 < ° r co 2 a 2 I w 0 ;$-) a 6 IR 6 I— =1. < ('s, c; 2 E 1 4-• eu Cr / _ 1 1;11 ,■-.11 ' , a: `,. f.':■ ,. • • , .-.1;_-1..,:tf::;:''.1Am ..41;,,0)12.1.;-.181,-* 52.V,itj'=•-•?,-„ — — %,...1.,...1:,i. ,L,,,..-if..-,e1'.I'•''''.:',. SI g) z. a 0 , .9-.If et.1.--IL•r41.-41:•■44, .......t.i4,21 !4•4twa. 1Pta.17,4..■ I ..imoo..i fiky....■ •:.- ..4..........,•-,1,,..4-.-.-1,--!-1-11-N-11 l's 10 r ii ' t • 1 I i ' . r ... a j j).J ' I 1 ' • 1 : 1 1 1 / 1 i [ 11 I I., - ,- : Ivor: 7.1,:-.-1:11,:ti..7*.t .:..zi-%..,r t_rz:a- ....2...-2-. r tr',,.--1,...I4, :. :- ._ I #' i 4 I --1 1 i ,s•.:: x .:-. 1 I 1: _. I , a I 1 1 5!8 I 1 1 .■ i 1 , . s•Ci 1 . 1 , ,ii I 1 ■ , . t'• 4.I. ' ...'.--1..".al ' .7.4 • . I I i -10 et,..sb oty .7 CS IC.-... -.....--I- A-..-1.1f. .....,4..(-4 i,r",r,, I t; et,ars-Mi•1111..i..101 ,,,..•173.'1,,,I,O.0,...1...0. ;-■.-■-■•• .-it?-t."--1 -...-s ,...._17,...____, k__...: .,._L..... 1 ' t ' - li , 1 , ._ I 1 t .,, .. 1, ... - v ... . T_.. ,,, •■• ,,,, I-- N..---,----- , 1 , 1 1 . 1 , .,.' ) 1 1 i ,. .g I _ - I \ 2 / , W ) ' , i / \ Y. | ■ \ , X 7 e� ` / § N ) : V\ $ _ / /// E T. I �� T S ` " NI I � ` � | ) | � 1 § - 7 ' H 1 HH ` l , , ` ) I / • #& c. k ° `0 ` `� 4 ■ :1 I` ■ §ƒ , , _ ._17. / - , E © Fil_l • ._.. # T !( • ;� o , o q 0 k • A ,ii. oo - - 3 k| e , - �ae� 00 � oo f T\\\ #� .iir 77 7 k ° 1 T w m w / L � "--.7-F :` O C> \ ƒƒ --— 2 ° : ; • ----• '-'7 _1 k§ \ , .0 �. . .. . � „ ,� III \ 2 11 . / J .. .. 0; •_ . % . 1 . L_ ~ , § § § § ~ ® ! ^ :2�� e) ( 2 = �- ■ • \ -' ( § e \ e ! e } / .7 § a §| o k �,, & _ `� - \ ) / ■ , f 01111 S # _ , - ? ! - v7 . . @, !§ . O / S S o o o S Alaska Department of Natural P -ources Land Administration System Page 1 of/* Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources (- Alaska DNR Case Summary File Type: ADL File Number: 28263 v+Printable Case File Summary See Township,Range, Section and Acreage? ( New Search 0 Yes 0 No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28263 Search for Status Plat Updates As of 08/09/2010 Customer: 000107377 BP EXPLORATION(ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/11/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 10/06/2009 Case Subtype: NS NORTH SLOPE Last Transaction: CHNGTEXT CHANGE LEGAL TEXT Meridian: U Township: 011N Range: 012E Section: 15 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 012E Section: 16 Section Acres: 640 Meridian: U Township: 011N Range: 012E Section: 21 Section Acres: 640 Meridian: U Township: 011N Range: 012E Section: 22 Section Acres: 640 Legal Description 05-28-1965 *** SALE NOTICE LEGAL DESCRIPTION *** C14-59 TI 1N, R12E, UM 15, 16,21, 22 2560.00 11-28-1969 SEGMENT 1 T 11N, R 12E, UM SECTION 15: 640 ACRES SECTION 16: 640 ACRES http://dnr.alaska.gov/projects/las/Case Summary.cfin?FileType=ADL&File eer=28263... 8/9/2010 0 0 0 °o 0o M O .mu.. o N • • ao 0 O r h- . r Ce LL w V CO O 0 4:1' _r- 1- M o I l °o I 1- o CO N T LL 1470 LIJ Q„ U o v CD o W I ° ii• o L. O CD •• CT Q 4 , • a O W o0 co O O co O O' cp O O O O Co LO O O O O LO TRANSMITTAL LETTER CHECKLIST WELL NAME '9 / 0?/9 PTD# SID/OS Development ✓ Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: Pre-J46e &247 POOL: Zarr'S Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 To N co a) 0- N (n 0 0 O (9 a — _ N C Q C 0 2 -0 7 o E a. L w N a 0O 4 c (° E O 0) m CD Lo o CO a` r 3 o 2, co c 0 co 0 c 0 co O C J 0 N a) CO a L U W N N co G� N L >, OO O) a E _l CO '3 a N O a O _C6 C O V co 00 N z CO N > .N > .-1-W O D a) > o 0 'N E Q P .3 Z 2 v 0 o a. N O co 7 >' '0 O M co C N c0 W N c w O N t/) N 0 M a) _o -Q E o ii N N as oD ° - a o y a) O o 0 z a W O 0 -O L N -O 0 a' C a co < 0 0 0 ,3 D) 0 N O .E- fA c N "O o 1 0 o C u) N a N C 7 O N CO_ a) N E 0 0 a) c a) 0. n > N E E CO 0 ii 5 z N 0 0 > _ Q 70- a o 0 6 E o o a o 0 a) a) a c O < O E = a .o .> x co co a x o O a) 3 co < N O co w m Q Z F- O Cc a 2 2 i Q 2 a a w < aa)) aN) aa)) aa)) aN) co aa)) aa)) aa)) aa)) aN) aa)) aN) aa)) < < aa)) < aa)) 0 aa)) a aa)) < aN) aN) aa)) aN) a aa)) aa)) aN) aN) O Q Q Q. Q az >- >- >- >- >- >- >- >- >- >- >- >- >- >- z z >- z >- z >- >- >- z >- >- >- >- >- >- >- >- >- z z z z z 0 I- o m N \ N LL 0 l j, a U o To- aci 3 L ,N E E 3 : qv E a) O U U c m m co C O o 0. N I�� L_ O _ o 1st O C m T U m a`) a) E 3 0 ° a 3 M (n T 0 0 c c o _1 o Z CO a ate) E aa)i m O as a�0i °)n Nn Q m > a) E N o (n C O a) N 0 d f6 00 l0 a N R. c\ CC— c 70 >, LL c J 7 co O O) 0- C -0 N N N cu V Q a o 0- a -o O Q N N c a) rn v a) 0 0 p JO co -o @ a 0 . ad O N a) 0 n) N c° �_ N c a o a) _ 7 j 't c E a N N 0. >, o E o a) } O) 2i .0 o ..> o "00 O 0 > O N N a o — 70_ 00 13 N N Q 0 0 7 a) m @ > - (0ri p o ° ce) E a�i O M ° O N co 2 ` co — L 0) 2 Z N (o 7 2i co co C 0) t c N 7 0' IJ 7 < N N a) N 0 W — D O C '0 0 a) 'C a3 a) a D 0 c a) oo O 0 co a) N d N C c 0 C o 0 0 Q E E C °o c c E o M c c N >- - c° o uS C 0 r 0) a ° r a CO c = O O "0 O "O u) 3 O 0 co Q. U C O N N N T O DY' _ 0 0 as c Q o rn 7 U .5 0 o aS d .3 ° > co a) 'N Q a O a) a) 'C .0 >, O 7 7 �O n CO O O y O O 0 @ O 0 a3 (6 a) Q @ D N '� ° m 0 a) C •N CC E n 0 0 o .c a o o ° c 0 m m ° Z o E E 3 0 o m t m w a) CL Q .0.. 7 C C .O (6 a) w +L.. a a) 3 N "O N 7 C a 0 CO '- 0 m °' N a a 3 O ° `-- N C -O CO J CO (0 a 0. , -0 (0 0 -0 E a) .N. .7 C N CO n3 N L 0 O 0 O c T 0 z .p. "0 C N N '(0 co 3 3 > 0 0 .. o 5. U U 30 •7 ° N 00 N Q 'Q c 0 �+ O CO ° w 0-... d O 2 C ' 0 "O > 0 a) .a -8 -8 O co E o 0 O 2 0 0 c 6 0 N ° N a3 O 0) C '0 a -co 7 a) o m a) as 0 m o ,� m o E a) E r o a) N c F o a a) o a) o a) _= aa) 7 7 a c g ° n o m a) a a) ,- ti m E as) o = 7 c o 0 -0 2' U m E N O O co a) Oa. N N (a0 --. .- 'C N 0) a c0 a) a) a) N 0) 0 0 0) >... C U 3 = a N O N O a To O m as (° 3 (° m .o .o a) .3 c co C O) 7 7 y N -0 •- o a) 0 -° 3 0 -o •'N . LL J a) a C '0 0 0 0 .N E N a a a 0 L Cl) 0 y C a) a) > C) C . a) Q a -co N O 0 O 0 a 0 T o E a a) E a ) m a) o = c c 0 c a a o 'N �° = 3 0 'c 0 o co c ac) c o co X 7 a7 (6 (6 0 0 E 3 7 0 O U a3 a) — 0 F. (6 — C 0 CO CO co U c F"" W C 3 0 0 U acj 2 0 0 .0 .0 a) 0 N o C. U a) 0 0 — a c0 'o (0 (/j a ,.- a) .0 .0 N V U M m N 6 0 0 o .° .> m m .E .E a —° n ° 0 m ►- r F ° 2 o' > CO w w Y a CO .E m N 0 ns a ci,J a) (u E a) a) a 7 -o 0 a o a) m ° 3 E o o 7 2 2 2 co N a 0) 00 " = 0 0 0 0 °- a) a`) co 'a) a) o m V@ a ° cn `�- O O a a 0 Q a z U cn 0 0 0 U < < 0 co co U N 2 a 0 co co 0 0 W °- I E ,- N M V l) c0 I-- oo O) O° N M V L) ((0 0 � 0 O N N N M CU (N O (0 r CO 0N) O M N M M M M L) 0 M r M CO M O V 0 0 O 0 .. c 0 O 0 0 U 0 C �iy. O co N l6 N CO N 0 0 ii o o 0 co 0) 0 CD 0 rn o v) W o co co c ao CO a°).E O. O w N N C a a) O l U W ill a a s C °a ( Q a a Well History File AP • END1X Infoi Illation of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. w219018112010SSN.txt Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ wed Jan 19 11:48:59 2011 Reel Header Service name LISTPE Date 11/01/19 Origin STS Reel Name UNKNOWN Continuation Number 01 Previous Reel Name UNKNOWN Comments STS LIS writing Library. Scientific Technical Services Tape Header Service name LISTPE Date 11/01/19 Origin STS Tape Name UNKNOWN Continuation Number 01 Previous Tape Name UNKNOWN Comments STS LIS writing Library. Scientific Technical services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME: W-219 API NUMBER: 500292342900 OPERATOR: BP Exploration Alaska, Inc. LOGGING COMPANY: Sperry Sun TAPE CREATION DATE: 19-JAN-11 JOB DATA MWD RUN 1 MWD RUN 2 MWD RUN 3 JOB NUMBER: MW-000752655 MW-000752655 MW-000752655 LOGGING ENGINEER: JACK KLEINHA JACK KLEINHA SHAWN POLAK OPERATOR WITNESS: JOEY LEBLANC JOEY LABLANC BLAIR NEUFEL MWD RUN 4 MAD RUN 4 JOB NUMBER: Mw-000752655 MW-000752655 LOGGING ENGINEER: SHAWN POLAK SHAWN POLAK OPERATOR WITNESS: BLAIR NEUFEL BLAIR NEUFEL SURFACE LOCATION SECTION: 21 TOWNSHIP: 11N RANGE: 12E FNL: FSL: 0 FEL: FWL: 0 Page 1 al - X05 20695 W219018112010SSN.txt ELEVATION (FT FROM MSL 0) KELLY BUSHING: .00 DERRICK FLOOR: 86.90 GROUND LEVEL: 52.10 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 12.250 .000 .0 2ND STRING 12.250 20.000 108.0 3RD STRING 8.750 9.625 4406.0 PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD) . 3. MWD RUN 1-2 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND A DRILLSTRING DYNAMICS SENSOR (DDSr) . 4. MWD RUN 3-4 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY- PHASE 4 (EWR-P4) , DRILLSTRING DYNAMICS SENSOR (DDSr) . COMPENSATED THERMAL NEUTRON POROSITY (CTN) , AND AZIMUTHAL LITHO-DENSITY (ALD) . 5. W-219 EXITED W-219PB2 FROM A SIDETRACK AT 5071' MD, 3867' TVD. 6. LOG AND MERGED DIGITAL MWD DATA FOR W-219 WERE SHIFTED TO THE PDCL FOR W-219 IS A SCHLUMBERGER GR RUN IN W-219 ON 22-NOV-2010. SHIFTING INSTRUCTIONS WERE PROVIDED VIA E-MAIL FROM D. DORTCH (SAIC/BP) DATED 04-JAN-2011, QUOTING AUTHORIZATION FROM WALTER TIFENTAL (BP) . LOG HEADER DATA AND ANNOTATIONS RETAIN ORIGINAL DRILLER'S DEPTH REFERENCES. 7. MWD RUNS 1-4 REPRESENT WELL W-219 WITH API# 50-029-23429-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 7128'MD, 5462'TVD. SROP = AVERAGE RATE OF PENETRATION SGRC = DGR COMBINED GAMMA RAY SEXP = 91N PHASE RESISTIVITY SESP = 151N PHASE RESISTIVITY SEMP = 271N PHASE RESISTIVITY SEDP = 391N PHASE RESISTIVITY SFXE = EWR FORMATION EXP TIME TNPS = CTN POROSITY SANDSTONE CTFA = CTN FAR AVG COUNT RATE Page 2 w219018112010SSN.txt CTNA = CTN NEAR AVG COUNT RATE SBD2 = ALD LCRB COMP DENSITY SCO2 = ALD LCRB DEN CORRECTION SNP2 = ALD LCRB PE FACTOR SRAT = RUNNING SPEED ARPM = ALD RPM HDBQ = ALD COMP DENSITY B-QUAD HDTQ = ALD COMP DENSITY T-QUAD HDLQ = ALD COMP DENSITY L-QUAD HDRQ = ALD COMP DENSITY R-QUAD HRBQ = ALD DEN CORRECTION B-QUAD HRTQ = ALD DEN CORRECTION T-QUAD HRLQ = ALD DEN CORRECTION L-QUAD HRRQ = ALD DEN CORRECTION R-QUAD HPBQ = ALD PE FACTOR B-QUAD HPTQ = ALD PE FACTOR T-QUAD HPLQ = ALD PE FACTOR L-QUAD HPRQ = ALD PE FACTOR R-QUAD AHSI = ALD HOLE-SIZE INDICATOR PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: FIXED AT 8.8 INCHES MUD WEIGHT: 8.8 - 9.5 PPG WHOLE MUD CHLORIDES: 500-600 PPM FORMATION WATER SALINITY: 11500 PPM CL FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE ALL DATA CURVES ARE SMOOTHED TO A STEP OF 0.5 FT, WITH A WINDOW OF 0.6 FT, EXCEPT FOR SROP AND SGRC. THESE CURVES ARE SMOOTHED WITH A 1.1 FT WINDOW. GAP FILL IS SET TO 5 FT FOR ALL CURVES. $ File Header Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 36.0 7085.0 ROP 70.0 7128.0 CALA 4390.5 7039.5 DH03 4390.5 7049.5 DHO1 4390.5 7049.5 DH02 4390.5 7049.5 PEF2 4390.5 7049.5 PEF4 4390.5 7049.5 PEF3 4390.5 7049.5 Page 3 w219018112010SSN.txt PEF1 4390.5 7049.5 RHO2 4390.5 7049.5 RHO4 4390.5 7049.5 RHOS 4390.5 7049.5 RHO1 4390.5 7049.5 DH04 4390.5 7049.5 CALN 4390.5 7050.5 RPM 4390.5 7077.0 NCNT 4390.5 7036.5 FET 4390.5 7077.0 NPHI 4390.5 7036.5 RPD 4390.5 7077.0 RPX 4390.5 7077.0 RPS 4390.5 7077.0 FCNT 4390.5 7036.5 RHOB 4391.0 7050.5 DRHO 4391.0 7050.5 PEF 4391.0 7050.5 $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GR 338.0 337.0 399.5 400.5 423.5 424.0 463.5 463.0 601.5 598.5 690.5 689.0 765.5 766.0 919.0 919.5 1076.5 1075.5 1177.5 1176.5 1273.5 1273.5 1464.0 1464.5 1630.0 1630.5 1804.5 1804.0 1888.0 1887.5 1939.0 1940.0 2169. 5 2163.0 2199.0 2196.5 2302. 5 2303.5 2668.0 2664.5 2904.0 2900.5 3090.0 3091.5 3288.5 3288.5 3328.0 3321.5 3398.0 3394.5 3538.5 3538.0 3854.5 3850.5 3969.5 3967.5 4200.0 4196.0 4338.0 4348.0 4479.5 4477.0 4624.5 4621.5 4779.0 4775.5 4881.0 4877.0 5009.0 5006.0 5050.5 5047.0 5074.0 5071.0 5213.5 5210.5 5468.5 5465. 5 Page 4 w219018112010SSN.txt 5815.0 5812.0 5963. 5 5961.0 6132.5 6130.0 6253.5 6249.5 6291.0 6288.5 6379.5 6377.0 6716.0 6713.0 $6922.5 6919.5 # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 35.0 1940.0 MWD 2 1940.5 4417.0 MWD 3 4360.5 5071.0 MWD 4 5071.5 7128.0 $ # REMARKS: MERGED MAIN PASS. $ # Data Format specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .11N Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 CALA MWD IN 4 1 68 4 2 CALN MWD IN 4 1 68 8 3 FCNT MWD CP30 4 1 68 12 4 NCNT MWD CP30 4 1 68 16 5 RHO1 MWD G/CC 4 1 68 20 6 RHOS MWD G/CC 4 1 68 24 7 RHO4 MWD G/CC 4 1 68 28 8 RHO2 MWD G/CC 4 1 68 32 9 PEF1 MWD B/E 4 1 68 36 10 PEF3 MWD B/E 4 1 68 40 11 PEF4 MWD B/E 4 1 68 44 12 PEF2 MWD B/E 4 1 68 48 13 DH01 MWD G/CC 4 1 68 52 14 DH03 MWD G/CC 4 1 68 56 15 DH04 MWD G/CC 4 1 68 60 16 DH02 MWD G/CC 4 1 68 64 17 DRHO MWD G/CC 4 1 68 68 18 RPD MWD OHMM 4 1 68 72 19 RPM MWD OHMM 4 1 68 76 20 RPS MWD OHMM 4 1 68 80 21 RPX MWD OHMM 4 1 68 84 22 FET MWD HR 4 1 68 88 23 GR MWD API 4 1 68 92 24 PEF MWD B/E 4 1 68 96 25 ROP MWD FPH 4 1 68 100 26 NPHI MWD PU 4 1 68 104 27 RHOB MWD G/CC 4 1 68 108 28 Page 5 W21901811201055N.txt First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 36 7128 3582 14185 36 7128 CALA MWD IN 8.51 12.051 9.30627 5289 4390.5 7039. 5 CALN MWD IN 8.19 15.05 8.93607 3250 4390.5 7050. 5 FCNT MWD CP30 449.56 2731.56 835.663 5293 4390.5 7036. 5 NCNT MWD CP30 112625 200359 141265 5293 4390.5 7036. 5 RHO1 MWD G/CC 0.229 2.746 2.23242 3272 4390.5 7049.5 RH03 MWD G/CC 1.223 2.804 2.19683 4222 4390.5 7049. 5 RH04 MWD G/CC 1.244 2.762 2.20467 3368 4390.5 7049. 5 RH02 MWD G/CC 1.276 2.75 2.14828 4824 4390.5 7049.5 PEF1 MWD B/E 0.964 15.628 2.36538 3300 4390.5 7049.5 PEF3 MWD B/E 1.078 14.333 2.52393 4275 4390.5 7049.5 PEF4 MWD B/E 1.178 14.655 2.51486 3398 4390.5 7049. 5 PEF2 MWD B/E 1.182 13.923 2.72974 4844 4390.5 7049. 5 DHO1 MWD G/CC -4.81 0.318 0.03386 3272 4390.5 7049. 5 DHO3 MWD G/CC -2.057 0.379 0.116232 4222 4390.5 7049.5 DH04 MWD G/CC -1.5 0.52 0.10195 3368 4390.5 7049. 5 DH02 MWD G/CC -0.264 0.427 0.200111 4824 4390.5 7049.5 DRHO MWD G/CC -3.12 0.463 0.113583 5320 4391 7050.5 RPD MWD OHMM 1.47 2000 9.4163 5374 4390.5 7077 RPM MWD OHMM 0.07 2000 7.07178 5374 4390.5 7077 RPS MWD OHMM 1.51 2000 6.92049 5374 4390.5 7077 RPX MWD OHMM 1.54 1774.88 6.17126 5374 4390.5 7077 FET MWD HR 0.15 141.55 2.27229 5374 4390.5 7077 GR MWD API 8.6481 142.931 68.3445 14099 36 7085 PEF MWD B/E 1.088 15.127 2.55871 5320 4391 7050.5 ROP MWD FPH 0.25 1659.24 222.492 13841 70 7128 NPHI MWD PU 11.24 109.63 38.56 5293 4390.5 7036.5 RHOB MWD G/CC 1.064 2.891 2.20173 5320 4391 7050.5 First Reading For Entire File 36 Last Reading For Entire File 7128 File Trailer Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Next File Name STSLIB.002 Physical EOF File Header Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 Page 6 w219018112010SSN.txt EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH NPHI 6120. 5 6600.0 FCNT 6120.5 6600.0 NCNT 6120. 5 6600.0 CALA 6123.0 6601.5 CALN 6133.5 6614.0 DRHO 6133.5 6614.0 DH02 6133. 5 6613.0 RHOB 6133.5 6614.0 RHO1 6133. 5 6613.0 RH03 6133.5 6613.0 DH04 6133.5 6613.0 RH04 6133.5 6613.0 RH02 6133.5 6613.0 PEF1 6133.5 6613.0 PEF3 6133.5 6613.0 DH03 6133.5 6613.0 PEF4 6133.5 6613.0 PEF2 6133.5 6613.0 DHO1 6133.5 6613.0 PEF 6133.5 6614.0 RPM 6161.5 6641.0 FET 6161.5 6641.0 RPD 6161.5 6641.0 RPX 6161.5 6641.0 RPS 6161.5 6641.0 GR 6169.5 6645.0 RAT 6214.5 6695.0 MERGED DATA SOURCE PBU TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE MWD 4 1 5071.5 7128.0 REMARKS: MERGED MAD PASS. Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point undefined Frame Spacing 60 .AIN Max frames per record undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 CALA MAD IN 4 1 68 4 2 CALN MAD IN 4 1 68 8 3 FCNT MAD CP30 4 1 68 12 4 NCNT MAD CP30 4 1 68 16 5 RHO1 MAD G/CC 4 1 68 20 6 RH03 MAD G/CC 4 1 68 24 7 Page 7 W219o1811201055N.txt RH04 MAD G/CC 4 1 68 28 8 RH02 MAD G/CC 4 1 68 32 9 PEF1 MAD B/E 4 1 68 36 10 PEF3 MAD B/E 4 1 68 40 11 PEF4 MAD B/E 4 1 68 44 12 PEF2 MAD B/E 4 1 68 48 13 DH01 MAD G/CC 4 1 68 52 14 DH03 MAD G/CC 4 1 68 56 15 DHO4 MAD G/CC 4 1 68 60 16 DHO2 MAD G/CC 4 1 68 64 17 RHOB MAD G/CC 4 1 68 68 18 DRHO MAD G/CC 4 1 68 72 19 RPD MAD OHMM 4 1 68 76 20 RPM MAD OHMM 4 1 68 80 21 RPS MAD OHMM 4 1 68 84 22 RPX MAD OHMM 4 1 68 88 23 FET MAD HR 4 1 68 92 24 GR MAD API 4 1 68 96 25 PEF MAD B/E 4 1 68 100 26 NPHI MAD PU 4 1 68 104 27 RAT MAD FPH 4 1 68 108 28 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 6120.5 6695 6407.75 1150 6120.5 6695 CALA MAD IN 8.48 9.77 9.06336 958 6123 6601.5 CALN MAD IN 8.25 10.07 8.67655 962 6133.5 6614 FCNT MAD CP30 828.89 2993.32 1095.63 960 6120.5 6600 NCNT MAD CP30 142654 206860 158461 960 6120.5 6600 RHO1 MAD G/CC 2 2.729 2.28748 960 6133.5 6613 RH03 MAD G/CC 1.931 2.773 2.27932 960 6133.5 6613 RH04 MAD G/CC 1.853 2.749 2.25187 960 6133.5 6613 RH02 MAD G/CC 1.882 2.72 2.25862 960 6133.5 6613 PEF1 MAD B/E 1.454 5.5 2.35249 960 6133.5 6613 PEF3 MAD B/E 1.501 6.402 2.32308 960 6133.5 6613 PEF4 MAD B/E 1.611 5.621 2.34021 960 6133.5 6613 PEF2 MAD B/E 1.623 6.427 2.36892 960 6133.5 6613 DHO1 MAD G/CC -0.049 0.128 0.0200104 960 6133.5 6613 DH03 MAD G/CC -0.07 0.236 0.0514719 960 6133.5 6613 DH04 MAD G/CC -0.02 0.276 0.0858615 960 6133.5 6613 DH02 MAD G/CC 0.011 0.362 0.140219 960 6133.5 6613 RHOB MAD G/CC 2.023 2.839 2.30324 962 6133.5 6614 DRHO MAD G/CC -0.026 0.344 0.0433264 962 6133.5 6614 RPD MAD OHMM 1.46 14.68 4.70075 960 6161.5 6641 RPM MAD OHMM 1.42 15.26 4.60425 960 6161.5 6641 RPS MAD OHMM 1.51 18.65 4.5529 960 6161.5 6641 RPX MAD OHMM 1.66 20.74 4.51566 960 6161.5 6641 FET MAD HR 8.21 20.31 14.2587 960 6161.5 6641 GR MAD API 34.21 136.05 78.2985 952 6169.5 6645 PEF MAD B/E 1.699 6.138 2.36661 962 6133.5 6614 NPHI MAD PU 14.42 40.87 32.9289 960 6120.5 6600 RAT MAD FPH 0.04 320.01 163.829 962 6214.5 6695 First Reading For Entire File 6120.5 Last Reading For Entire File 6695 File Trailer Service name STSLIB.002 Service Sub Level Name Page 8 w219018112010S5N.txt Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Next File Name STSLIB.003 Physical EOF File Header Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SGRC 35.0 1940.0 SROP 69.0 1940.0 $ # LOG HEADER DATA DATE LOGGED: 02-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 1940.0 TOP LOG INTERVAL (FT) : 70.0 BOTTOM LOG INTERVAL (FT) : 1940.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 2.0 MAXIMUM ANGLE: 53.4 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 10718512 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 12.250 DRILLER'S CASING DEPTH (FT) : 108.0 # BOREHOLE CONDITIONS MUD TYPE: Native/Spud Mud MUD DENSITY (LB/G) : 9.20 MUD VISCOSITY (5) : .0 MUD PH: 10.6 MUD CHLORIDES (PPM) : 400 FLUID LOSS (C3) : .0 Page 9 w219018112010SSN.txt RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 95.5 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .11N Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FPH 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 35 1940 987.5 3811 35 1940 ROP MWD010 FPH 12.48 600.57 174.369 3743 69 1940 GR MWD010 API 11. 55 114.04 50.2589 3811 35 1940 First Reading For Entire File 35 Last Reading For Entire File 1940 File Trailer Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Next File Name STSLIB.004 Physical EOF File Header Service name STSLIB.004 Service Sub Level Name Page 10 • w219o18112010SSN.txt Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SGRC 1940.5 4360.0 SROP 2074.0 4417.0 LOG HEADER DATA DATE LOGGED: 06-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 4417.0 TOP LOG INTERVAL (FT) : 1940.0 BOTTOM LOG INTERVAL (FT) : 4417.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 32.8 MAXIMUM ANGLE: 55.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 163685 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 12.250 DRILLER'S CASING DEPTH (FT) : 108.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 9.40 MUD VISCOSITY (S) : 45.0 MUD PH: 10.8 MUD CHLORIDES (PPM) : 400 FLUID LOSS (C3) : 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 2.200 70.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.770 88. 5 MUD FILTRATE AT MT: 2.390 70.0 MUD CAKE AT MT: 2.000 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : Page 11 w219018112010SSN.txt REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point undefined Frame Spacing 60 .AIN Max frames per record undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD020 API 4 1 68 4 2 ROP MWD020 FPH 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 1940.5 4417 3178.75 4954 1940.5 4417 GR MWD020 API 23.9 127.88 78.3658 4840 1940.5 4360 ROP MWD020 FPH 35.69 987.4 272.982 4687 2074 4417 First Reading For Entire File 1940.5 Last Reading For Entire File 4417 File Trailer Service name STSLIB.004 Service sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Next File Name STSLIB.005 Physical EOF File Header Service name STSLIB.005 Service Sub Level Name version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 Page 12 w219o18112010SSN.txt FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SGRC 4360.5 5071.0 CTFA 4396.0 5071.0 HPBQ 4396.0 5071.0 HDTQ 4396.0 5071.0 HDRQ 4396.0 5071.0 HRTQ 4396.0 5071.0 ACAL 4396.0 5071.0 HDBQ 4396.0 5071.0 SEMP 4396.0 5071.0 CTNA 4396.0 5071.0 SEDP 4396.0 5071.0 TNPS 4396.0 5071.0 HRBQ 4396.0 5071.0 AHSI 4396.0 5071.0 HDLQ 4396.0 5071.0 HPRQ 4396.0 5071.0 HRLQ 4396.0 5071.0 HPLQ 4396.0 5071.0 SESP 4396.0 5071.0 SEXP 4396.0 5071.0 SFXE 4396.0 5071.0 HPTQ 4396.0 5071.0 HRRQ 4396.0 5071.0 SCO2 4396.5 5071.0 SNP2 4396.5 5071.0 SBD2 4396.5 5071.0 SROP 4417.5 5071.0 LOG HEADER DATA DATE LOGGED: 13-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 5071.0 TOP LOG INTERVAL (FT) : 4417.0 BOTTOM LOG INTERVAL (FT) : 5071.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 33.5 MAXIMUM ANGLE: 54.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 11321777 EWR4 EWR Phase-4 231951 CTN Comp Thermal Neutron 244601 ALD Azimuthal Litho Dens 1205035 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 8.750 DRILLER'S CASING DEPTH (FT) : 4406.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 9.40 MUD VISCOSITY (S) : 50.0 MUD PH: 10.8 Page 13 . w219o18112010SSN.txt MUD CHLORIDES (PPM) : 400 FLUID LOSS (C3) : 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 2.200 70.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.410 113.2 MUD FILTRATE AT MT: 2.390 70.0 MUD CAKE AT MT: 2.000 70.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : # TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ # Data Format specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point undefined Frame Spacing 60 .11N Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 CALA MWD030 IN 4 1 68 4 2 CALN MWD030 IN 4 1 68 8 3 FCNT MWD030 CP30 4 1 68 12 4 NCNT MWD030 CP30 4 1 68 16 5 RHO1 MWD030 G/CC 4 1 68 20 6 RH03 MWD030 G/CC 4 1 68 24 7 RH04 MWD030 G/CC 4 1 68 28 8 RH02 MWD030 G/CC 4 1 68 32 9 PEF1 MWD030 B/E 4 1 68 36 10 PEF3 MWD030 B/E 4 1 68 40 11 PEF4 MWD030 B/E 4 1 68 44 12 PEF2 MWD030 B/E 4 1 68 48 13 DHO1 MWD030 G/CC 4 1 68 52 14 DHO3 MWD030 G/CC 4 1 68 56 15 DH04 MWD030 G/CC 4 1 68 60 16 DH02 MWD030 G/CC 4 1 68 64 17 RHOB MWD030 G/CC 4 1 68 68 18 DRHO MWD030 G/CC 4 1 68 72 19 RPD MWD030 OHMM 4 1 68 76 20 RPM MWD030 OHMM 4 1 68 80 21 RPS MWD030 OHMM 4 1 68 84 22 RPX MWD030 OHMM 4 1 68 88 23 FET MWD030 HR 4 1 68 92 24 GR MWD030 API 4 1 68 96 25 PEF MWD030 B/E 4 1 68 100 26 ROP MWD030 FPH 4 1 68 104 27 NPHI MWD030 PU 4 1 68 108 28 Page 14 w219o1811201055N.txt First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4360.5 5071 4715.75 1422 4360.5 5071 CALA MWD030 IN 8. 592 12.051 9.47482 1341 4396 5071 CALN MWD030 IN 8.19 12.09 9.15253 700 4396 5071 FCNT MWD030 CP30 449.56 1035.82 736.26 1351 4396 5071 NCNT MWD030 CP30 114087 154487 134890 1351 4396 5071 RHO1 MWD030 G/CC 0.229 2.671 2.1329 729 4396 5071 RHO3 MWD030 G/CC 1.314 2.552 2.10767 1259 4396 5071 RHO4 MWD030 G/CC 1.309 2.611 2.08092 692 4396 5071 RHO2 MWD030 G/CC 1.31 2.75 2.02186 946 4396 5071 PEF1 MWD030 B/E 0.964 15.628 2.43406 738 4396 5071 PEF3 MWD030 B/E 1.078 14.333 2.6037 1260 4396 5071 PEF4 MWD030 B/E 1.178 14.655 2.66469 706 4396 5071 PEF2 MWD030 B/E 1.182 13.923 2.88998 952 4396 5071 DHO1 MWD030 G/CC -4.81 0.184 0.00056653 729 4396 5071 DHO3 MWD030 G/CC -2.057 0.323 0.112365 1259 4396 5071 DH04 MWD030 G/CC -1.5 0.27 0.0838396 692 4396 5071 DH02 MWD030 G/CC -0.264 0.338 0.176846 946 4396 5071 RHOB MWD030 G/CC 1.064 2.701 2.1365 1350 4396.5 5071 DRHO MWD030 G/CC -3.12 0.383 0.0943022 1350 4396.5 5071 RPD MWD030 OHMM 1.47 2000 21.2069 1351 4396 5071 RPM MWD030 OHMM 0.07 2000 13.584 1351 4396 5071 RPS MWD030 OHMM 2.94 2000 12.9758 1351 4396 5071 RPX MWD030 OHMM 2.84 1774.88 10.2247 1351 4396 5071 FET MWD030 HR 0.3 141.55 5.55817 1351 4396 5071 GR MWD030 API 13.33 137.12 63.4299 1422 4360.5 5071 PEF MWD030 B/E 1.088 15.127 2.60823 1350 4396.5 5071 ROP MWD030 FPH 0.25 1340.16 262.05 1308 4417.5 5071 NPHI MWD030 PU 30.74 109.63 44.5984 1351 4396 5071 First Reading For Entire File 4360.5 Last Reading For Entire File 5071 File Trailer Service name STSLIB.005 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Next File Name STSLIB.006 Physical EOF File Header Service name STSLIB.006 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. Page 15 W219018112010SSN.txt BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH HPLQ 5071.5 7046.5 CTNA 5071.5 7033.5 SEMP 5071.5 7074.0 HPTQ 5071.5 7046.5 HRBQ 5071.5 7046.5 TNPS 5071.5 7033.5 SESP 5071.5 7074.0 ANSI 5071.5 7047.5 SBD2 5071.5 7047.5 ACAL 5071.5 7036.5 CTFA 5071.5 7033.5 HPBQ 5071.5 7046.5 SROP 5071.5 7128.0 SCO2 5071.5 7047.5 HDTQ 5071.5 7046.5 SFXE 5071.5 7074.0 SGRC 5071.5 7081.5 HDBQ 5071.5 7046.5 HRLQ 5071.5 7046.5 HDRQ 5071.5 7046.5 HPRQ 5071.5 7046.5 SNP2 5071.5 7047.5 HDLQ 5071.5 7046.5 SEXP 5071.5 7074.0 HRTQ 5071.5 7046.5 SEDP 5071.5 7074.0 HRRQ 5071. 5 7046.5 LOG HEADER DATA DATE LOGGED: 18-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 7128.0 TOP LOG INTERVAL (FT) : 5071.0 BOTTOM LOG INTERVAL (FT) : 7128.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 32.4 MAXIMUM ANGLE: 45.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 11321777 EWR4 EWR Phase-4 231951 CTN Comp Thermal Neutron 244601 ALD Azimuthal Litho Dens 1205035 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 8.750 DRILLER'S CASING DEPTH (FT) : 4406.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 8.90 Page 16 . w219o18112010SSN.txt MUD VISCOSITY (S) : 47.0 MUD PH: 9.4 MUD CHLORIDES (PPM) : 400 FLUID LOSS (C3) : 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 2.200 68.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.330 116.8 MUD FILTRATE AT MT: 2.800 68.0 MUD CAKE AT MT: 2.000 68.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : # TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : # REMARKS: $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .AIN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order units Size Nsam Rep code offset Channel DEPT FT 4 1 68 0 1 CALA MWD040 IN 4 1 68 4 2 CALN MWD040 IN 4 1 68 8 3 FCNT MWD040 CP30 4 1 68 12 4 NCNT MWD040 CP30 4 1 68 16 5 RHO1 MWD040 G/CC 4 1 68 20 6 RHOS MWD040 G/CC 4 1 68 24 7 RHO4 MWD040 G/CC 4 1 68 28 8 RHO2 MWD040 G/CC 4 1 68 32 9 PEF1 MWD040 B/E 4 1 68 36 10 PEF3 MWD040 B/E 4 1 68 40 11 PEF4 MWD040 B/E 4 1 68 44 12 PEF2 MWD040 B/E 4 1 68 48 13 DHO1 MWD040 G/CC 4 1 68 52 14 DHO3 MWD040 G/CC 4 1 68 56 15 DH04 MWD040 G/CC 4 1 68 60 16 DH02 MWD040 G/CC 4 1 68 64 17 RHOB MWD040 G/CC 4 1 68 68 18 DRHO MWD040 G/CC 4 1 68 72 19 RPD MWD040 OHMM 4 1 68 76 20 RPM MWD040 OHMM 4 1 68 80 21 RPS MWD040 OHMM 4 1 68 84 22 RPX MWD040 OHMM 4 1 68 88 23 FET MWD040 HR 4 1 68 92 24 GR MWD040 API 4 1 68 96 25 PEF MWD040 B/E 4 1 68 100 26 ROP MWD040 FPH 4 1 68 104 27 NPHI MWD040 PU 4 1 68 108 28 Page 17 w219o1811201055N.txt First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5071. 5 7128 6099.75 4114 5071.5 7128 CALA MWD040 IN 8.51 11.22 9.24825 3931 5071.5 7036.5 CALN MWD040 IN 8.25 15.05 8.87537 2536 5071.5 7047.5 FCNT MWD040 CP30 473.56 2731.56 870.488 3925 5071.5 7033.5 NCNT MWD040 CP30 112625 200359 143489 3925 5071.5 7033.5 RHO1 MWD040 G/CC 1.295 2.746 2.26234 2529 5071.5 7046.5 RHOS MWD040 G/CC 1.223 2.804 2.23559 2950 5071.5 7046.5 RHO4 MWD040 G/CC 1.244 2.762 2.23792 2663 5071.5 7046.5 RHO2 MWD040 G/CC 1.276 2.682 2.17973 3860 5071.5 7046. 5 PEF1 MWD040 B/E 1.044 6.365 2.34128 2548 5071.5 7046.5 PEF3 MWD040 B/E 1.401 7.357 2.48519 3002 5071.5 7046. 5 PEF4 MWD040 B/E 1.258 5.989 2.46984 2679 5071.5 7046.5 PEF2 MWD040 B/E 1.293 7.707 2.68419 3874 5071.5 7046.5 DHO1 MWD040 G/CC -0.088 0.318 0.0448541 2529 5071.5 7046.5 DHO3 MWD040 G/CC -0.045 0.379 0.118436 2950 5071.5 7046.5 DH04 MWD040 G/CC -0.056 0.52 0.107344 2663 5071.5 7046.5 DH02 MWD040 G/CC -0.024 0.427 0.206018 3860 5071.5 7046.5 RHOB MWD040 G/CC 1.263 2.891 2.22451 3953 5071.5 7047.5 DRHO MWD040 G/CC -0.062 0.463 0.120666 3953 5071.5 7047.5 RPD MWD040 OHMM 1.51 25.77 4.92454 4006 5071. 5 7074 RPM MWD040 OHMM 1.49 28.06 4.83883 4006 5071.5 7074 RPS MWD040 OHMM 1.51 27.82 4.84991 4006 5071.5 7074 RPX MWD040 OHMM 1.54 26.63 4.78063 4006 5071.5 7074 FET MWD040 HR 0.15 81.11 0.993073 4006 5071.5 7074 GR MWD040 API 8.6481 142.931 75.0645 4021 5071.5 7081.5 PEF MWD040 B/E 1.097 7.69 2.53637 3953 5071.5 7047.5 ROP MWD040 FPH 12.15 1659.24 196.364 4114 5071.5 7128 NPHI MWD040 PU 11.24 96.47 36.4388 3925 5071.5 7033.5 First Reading For Entire File 5071.5 Last Reading For Entire File 7128 File Trailer Service name STSLIB.006 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Next File Name STSLIB.007 Physical EOF File Header Service name STSLIB.007 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 Page 18 J . W219018112010SSN.txt RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 4 MAD PASS NUMBER: 1 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TNPS 6118.0 6597.0 CTNA 6118.0 6597.0 CTFA 6118.0 6597.0 ACAL 6120.5 6598.5 HDTQ 6131.0 6610.0 SNP2 6131.0 6611.0 SCO2 6131.0 6611.0 SBD2 6131.0 6611.0 HRRQ 6131.0 6610.0 AHSI 6131.0 6611.0 HRBQ 6131.0 6610.0 HDLQ 6131.0 6610.0 HDRQ 6131.0 6610.0 HRLQ 6131.0 6610.0 HPBQ 6131.0 6610.0 HPLQ 6131.0 6610.0 HPRQ 6131.0 6610.0 HDBQ 6131.0 6610.0 HPTQ 6131.0 6610.0 HRTQ 6131.0 6610.0 SEDP 6158.5 6638.0 SFXE 6158.5 6638.0 SEXP 6158.5 6638.0 SEMP 6158.5 6638.0 SESP 6158.5 6638.0 SGRC 6166.5 6642.0 $RAT 6211.0 6692.0 LOG HEADER DATA DATE LOGGED: 18-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 7128.0 TOP LOG INTERVAL (FT) : 5071.0 BOTTOM LOG INTERVAL (FT) : 7128.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 32.4 MAXIMUM ANGLE: 45. 5 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 11321777 EWR4 EWR Phase-4 231951 CTN Comp Thermal Neutron 244601 ALD Azimuthal Litho Dens 1205035 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 12.250 DRILLER'S CASING DEPTH (FT) : 4406.0 # Page 19 Ns w219018112010SSN.txt BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 8.90 MUD VISCOSITY (S) : 47.0 MUD PH: 9.4 MUD CHLORIDES (PPM) : 400 FLUID LOSS (C3) : 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 2.200 68.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.330 116.8 MUD FILTRATE AT MT: 2.800 68.0 MUD CAKE AT MT: 2.000 68.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .11N Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 CALA MAD041 IN 4 1 68 4 2 CALN MAD041 IN 4 1 68 8 3 FCNT MAD041 CP30 4 1 68 12 4 NCNT MAD041 CP30 4 1 68 16 5 RHO1 MAD041 G/CC 4 1 68 20 6 RH03 MAD041 G/CC 4 1 68 24 7 RH04 MAD041 G/CC 4 1 68 28 8 RH02 MAD041 G/CC 4 1 68 32 9 PEF1 MAD041 B/E 4 1 68 36 10 PEF3 MAD041 B/E 4 1 68 40 11 PEF4 MAD041 B/E 4 1 68 44 12 PEF2 MAD041 B/E 4 1 68 48 13 DHO1 MAD041 G/CC 4 1 68 52 14 DHO3 MAD041 G/CC 4 1 68 56 15 DH04 MAD041 G/CC 4 1 68 60 16 DH02 MAD041 G/CC 4 1 68 64 17 RHOB MAD041 G/CC 4 1 68 68 18 DRHO MAD041 G/CC 4 1 68 72 19 RPD MAD041 OHMM 4 1 68 76 20 RPM MAD041 OHMM 4 1 68 80 21 RPS MAD041 OHMM 4 1 68 84 22 RPX MAD041 OHMM 4 1 68 88 23 FET MAD041 HR 4 1 68 92 24 GR MAD041 API 4 1 68 96 25 PEF MAD041 B/E 4 1 68 100 26 Page 20 r a .. w219018112010SSN.txt RAT MAD041 FPH 4 1 68 104 27 NPHI MAD041 PU 4 1 68 108 28 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 6118 6692 6405 1149 6118 6692 CALA MAD041 IN 8.48 9.77 9.06429 957 6120.5 6598.5 CALN MAD041 IN 8.25 10.07 8.67805 961 6131 6611 FCNT MAD041 CP30 828.89 2993.32 1095.52 959 6118 6597 NCNT MAD041 CP30 142654 206860 158453 959 6118 6597 RHO1 MAD041 G/CC 2 2.729 2.2877 959 6131 6610 RHOS MAD041 G/CC 1.931 2.773 2.27944 959 6131 6610 RHO4 MAD041 G/CC 1.853 2.749 2.25172 959 6131 6610 RH02 MAD041 G/CC 1.882 2.72 2.25808 959 6131 6610 PEF1 MAD041 B/E 1.454 5.5 2.35377 959 6131 6610 PEF3 MAD041 B/E 1.501 6.402 2.32314 959 6131 6610 PEF4 MAD041 B/E 1.611 5.621 2.34113 959 6131 6610 PEF2 MAD041 B/E 1.623 6.427 2.36853 959 6131 6610 DHO1 MAD041 G/CC -0.049 0.128 0.0199708 959 6131 6610 DH03 MAD041 G/CC -0.07 0.236 0.0514515 959 6131 6610 DH04 MAD041 G/CC -0.02 0.276 0.086025 959 6131 6610 DHO2 MAD041 G/CC 0.011 0.362 0.14017 959 6131 6610 RHOB MAD041 G/CC 2.023 2.839 2.30344 961 6131 6611 DRHO MAD041 G/CC -0.026 0.344 0.043283 961 6131 6611 RPD MAD041 OHMM 1.46 14.68 4.69486 960 6158.5 6638 RPM MAD041 OHMM 1.42 15.26 4.59898 960 6158.5 6638 RPS MAD041 OHMM 1.51 18.65 4.54766 960 6158.5 6638 RPX MAD041 OHMM 1.66 20.74 4.51073 960 6158.5 6638 FET MAD041 HR 8.21 20.31 14.2646 960 6158.5 6638 GR MAD041 API 34.21 136.05 78.3066 952 6166. 5 6642 PEF MAD041 B/E 1.699 6.138 2.36682 961 6131 6611 RAT MAD041 FPH 0.04 320.01 163.694 963 6211 6692 NPHI MAD041 PU 14.42 40.87 32.9276 959 6118 6597 First Reading For Entire File 6118 Last Reading For Entire File 6692 File Trailer Service name STSLIB.007 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Next File Name STSLIB.008 Physical EOF Tape Trailer Service name LISTPE Date 11/01/19 origin STS Tape Name UNKNOWN Continuation Number 01 Next Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Page 21 W219018112010SSN.txt Reel Trailer Service name LISTPE Date 11/01/19 Origin STS Reel Name UNKNOWN Continuation Number 01 Next Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File Page 22 w219PB1002112010SSN.txt Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ wed Jan 19 11:07:05 2011 Reel Header Service name LISTPE Date 11/01/19 Origin STS Reel Name UNKNOWN Continuation Number 01 Previous Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Tape Header Service name LISTPE Date 11/01/19 origin STS Tape Name UNKNOWN Continuation Number 01 Previous Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME: W-219PB1 API NUMBER: 500292342970 OPERATOR: BP Exploration Alaska, Inc. LOGGING COMPANY: Sperry Sun TAPE CREATION DATE: 18-JAN-11 JOB DATA MWD RUN 1 JOB NUMBER: Mw-000752655 LOGGING ENGINEER: JACK KLEINHA OPERATOR WITNESS: JOEY LEBLANC SURFACE LOCATION SECTION: 21 TOWNSHIP: 11N RANGE: 12E FNL: FSL: 4811 FEL: 1177 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: .00 DERRICK FLOOR: 86.90 GROUND LEVEL: 52.10 WELL CASING RECORD Page 1 W219PB1002112010SSN.txt OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 12.250 20.000 108.0 2ND STRING 3RD STRING PRODUCTION STRING # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD) . 3. MWD RUN 1 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND A DRILLSTRING DYNAMICS SENSOR (DDSr) . 4. LOG AND MERGED DIGITAL MWD DATA FOR W-219PB1 WERE SHIFTED ABOVE THE KICK-OFF POINT FROM W-219, AT 1940' MD, 1839' TVD. THE PDCL FOR W-219 IS A SCHLUMBERGER GR RUN IN W-219 ON 22-NOV-2010. SHIFTING INSTRUCTIONS WERE PROVIDED VIA E-MAIL FROM D. DORTCH (SAIC/BP) DATED 04-JAN-2011, QUOTING AUTHORIZATION FROM WALTER TIFENTAL (BP) . LOG HEADER DATA AND ANNOTATIONS RETAIN ORIGINAL DRILLER'S DEPTH REFERENCES. 5. MWD RUNS 1 REPRESENT WELL W-219PB1 WITH API# 50-029-23429-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 4422'MD, 3444'TVD. SROP = AVERAGE RATE OF PENETRATION SGRC = DUAL GAMMA RAY COMBINED ALL DATA CURVES ARE SMOOTHED TO A STEP OF 0.5 FT, WITH A WINDOW OF 0.6 FT, EXCEPT FOR SROP AND SGRC. THESE CURVES ARE SMOOTHED WITH A 1.1 FT WINDOW. GAP FILL IS SET TO 5 FT FOR ALL CURVES. $ File Header Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 # Page 2 W219PB1002112010SSN.txt FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 36.0 4363.0 ROP 70.0 4421.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GR 338.0 337.0 399.5 400.5 423.5 424.0 463.5 463.0 601.5 598.5 690.5 689.0 765.5 766.0 919.0 919.5 1076.5 1075.5 1177.5 1176.5 1273.5 1273.5 1464.0 1464.5 1630.0 1630.5 1804.5 1804.0 1888.0 1887.5 1939.0 1940.0 MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 35.0 4422.0 REMARKS: MERGED MAIN PASS. Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .11N Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD API 4 1 68 4 2 ROP MWD FPH 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 36 4421 2228.5 8771 36 4421 GR MWD API 11.55 132.05 64.8815 8655 36 4363 ROP MWD FPH 0 1060.42 253.332 8703 70 4421 First Reading For Entire File 36 Page 3 w219PB1002112010SSN.txt Last Reading For Entire File 4421 File Trailer Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Next File Name STSLIB.002 Physical EOF File Header Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SGRC 35.0 4364.0 SROP 69.0 4422.0 $ # LOG HEADER DATA DATE LOGGED: 02-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.20 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 4422.0 TOP LOG INTERVAL (FT) : 70.0 BOTTOM LOG INTERVAL (FT) : 4422.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 2.0 MAXIMUM ANGLE: 53.4 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 10718512 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 12.250 DRILLER'S CASING DEPTH (FT) : 108.0 # BOREHOLE CONDITIONS Page 4 w219PB1002112010SSN.txt MUD TYPE: Native/Spud Mud MUD DENSITY (LB/G) : 9.20 MUD VISCOSITY (S) : .0 MUD PH: 10.6 MUD CHLORIDES (PPM) : 400 FLUID LOSS (C3) : .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 95. 5 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD010 API 4 1 68 4 2 ROP MWD010 FPH 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 35 4422 2228.5 8775 35 4422 GR MWD010 API 11.55 132.05 64.8864 8659 35 4364 ROP MWD010 FPH 0 1060.42 253.326 8707 69 4422 First Reading For Entire File 35 Last Reading For Entire File 4422 File Trailer Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Next File Name STSLIB.003 Page 5 w219PB1002112010SSN.txt Physical EOF Tape Trailer Service name LISTPE pate 11/01/19 Origin STS Tape Name UNKNOWN Continuation Number 01 Next Tape Name UNKNOWN Comments STS LIS writing Library. scientific Technical services Reel Trailer Service name LISTPE pate 11/01/19 Origin STS Reel Name UNKNOWN continuation Number 01 Next Reel Name UNKNOWN Comments STS LIS writing Library. scientific Technical services Physical EOF Physical EOF End of LIS File Page 6 w219PB2013112010SSN.txt Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Wed Jan 19 11:49:18 2011 Reel Header Service name LISTPE Date 11/01/19 Origin STS Reel Name UNKNOWN Continuation Number 01 Previous Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Tape Header Service name LISTPE Date 11/01/19 Origin STS Tape Name UNKNOWN Continuation Number 01 Previous Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME: W-219PB2 API NUMBER: 500292342971 OPERATOR: BP Exploration Alaska, Inc. LOGGING COMPANY: Sperry Sun TAPE CREATION DATE: 18-JAN-11 JOB DATA MWD RUN 1 MWD RUN 2 MWD RUN 3 JOB NUMBER: Mw-000752655 Mw-000752655 Mw-000752655 LOGGING ENGINEER: JACK KLEINHA JACK KLEINHA SHAWN POLAK OPERATOR WITNESS: JOEY LEBLANC JOEY LABLANC BLAIR NEUFEL SURFACE LOCATION SECTION: 21 TOWNSHIP: 11N RANGE: 12E FNL: FSL: 4811 FEL: 1177 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: .00 DERRICK FLOOR: 86.90 GROUND LEVEL: 52.10 WELL CASING RECORD Page 1 at o -le S- goC095— w219PB2013112010SSN.txt OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 12.250 20.000 108.0 2ND STRING 8.750 9.875 4406.0 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD) . 3. MWD RUN 1-2 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND A DRILLSTRING DYNAMICS SENSOR (DDSr) . 4. W-219PB2 EXITED W-219PB1 FROM A SIDETRACK AT 1940' MD, 1839' TVD. 5. MWD RUN 3 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY- PHASE 4 (EWR-P4) , DRILLSTRING DYNAMICS SENSOR (DDSr) . COMPENSATED THERMAL NEUTRON POROSITY (CTN) , AND AZIMUTHAL LITHO-DENSITY (ALD) . 6. LOG AND MERGED DIGITAL MWD DATA FOR W-219PB2 WERE SHIFTED ABOVE THE KICK-OFF POINT FROM W-219, AT 5071' MD, 3867' TVD. THE PDCL FOR W-219 IS A SCHLUMBERGER GR RUN IN W-219 ON 22-NOV-2010. SHIFTING INSTRUCTIONS WERE PROVIDED VIA E-MAIL FROM D. DORTCH (SAIC/BP) DATED 04-JAN-2011, QUOTING AUTHORIZATION FROM WALTER TIFENTAL (BP) . LOG HEADER DATA AND ANNOTATIONS RETAIN ORIGINAL DRILLER'S DEPTH REFERENCES. 7. MWD RUNS 1-3 REPRESENT WELL W-219PB2 WITH API# 50-029-23429-71. THIS WELL REACHED A TOTAL DEPTH (TD) OF 6960'MD, 5398'TVD. SROP = AVERAGE RATE OF PENETRATION SGRC = DGR COMBINED GAMMA RAY SEXP = 91N PHASE RESISTIVITY SESP = 151N PHASE RESISTIVITY SEMP = 271N PHASE RESISTIVITY SEDP = 391N PHASE RESISTIVITY SFXE = EWR FORMATION EXP TIME TNPS = CTN POROSITY SANDSTONE CTFA = CTN FAR AVG COUNT RATE CTNA = CTN NEAR AVG COUNT RATE SBD2 = ALD LCRB COMP DENSITY SCO2 = ALD LCRB DEN CORRECTION Page 2 w219PB2013112010ssN.txt SNP2 = ALD LCRB PE FACTOR SRAT = RUNNING SPEED ARPM = ALD RPM HDBQ = ALD COMP DENSITY B-QUAD HDTQ = ALD COMP DENSITY T-QUAD HDLQ = ALD COMP DENSITY L-QUAD HDRQ = ALD COMP DENSITY R-QUAD HRBQ = ALD DEN CORRECTION B-QUAD HRTQ = ALD DEN CORRECTION T-QUAD HRLQ = ALD DEN CORRECTION L-QUAD HRRQ = ALD DEN CORRECTION R-QUAD HPBQ = ALD PE FACTOR B-QUAD HPTQ = ALD PE FACTOR T-QUAD HPLQ = ALD PE FACTOR L-QUAD HPRQ = ALD PE FACTOR R-QUAD AHSI = ALD HOLE-SIZE INDICATOR PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: FIXED AT 8.8 INCHES MUD WEIGHT: 8.7 - 8.9 PPG WHOLE MUD CHLORIDES: 400 PPM FORMATION WATER SALINITY: 11500 PPM CL FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE ALL DATA CURVES ARE SMOOTHED TO A STEP OF 0.5 FT, WITH A WINDOW OF 0.6 FT, EXCEPT FOR SROP AND SGRC. THESE CURVES ARE SMOOTHED WITH A 1.1 FT WINDOW. GAP FILL IS SET TO 5 FT FOR ALL CURVES. File Header Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 36.0 6917.0 ROP 70.0 6960.0 NCNT 4390.5 6869.0 DRHO 4390.5 6882.5 RHOB 4390.5 6882.5 D H02 4390.5 6882.5 D H03 4390.5 6882.5 DHO1 4390.5 6882.5 PEF2 4390.5 6882.5 PEF4 4390.5 6882.5 RPD 4390.5 6909.0 PEF1 4390.5 6882.5 Page 3 w219PB2O13112010SSN.txt DHO4 4390.5 6882.5 RHO4 4390.5 6882.5 RHO2 4390. 5 6882.5 RHO' 4390.5 6882.5 FCNT 4390.5 6869.0 CALN 4390.5 6882.5 CALA 4390.5 6872.5 PEF3 4390.5 6882.5 RPX 4390.5 6909.0 RPM 4390.5 6909.0 NPHI 4390.5 6869.0 RPS 4390.5 6909.0 FET 4390.5 6908.5 RHO3 4390.5 6882.5 PEF 4391.0 6882.5 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GR 338.0 337.0 399.5 400.5 423.5 424.0 463.5 463.0 601.5 598.5 690.5 689.0 765.5 766.0 919.0 919.5 1076.5 1075.5 1177.5 1176.5 1273.5 1273.5 1464.0 1464.5 1630.0 1630.5 1804.5 1804.0 1888.0 1887.5 1939.0 1940.0 2169.5 2163.0 2199.0 2196.5 2302.5 2303.5 2668.0 2664.5 2904.0 2900.5 3090.0 3091.5 3288.5 3288.5 3328.0 3321.5 3398.0 3394.5 3538.5 3538.0 3854.5 3850.5 3969.5 3967.5 4200.0 4196.0 4338.0 4348.0 4479.5 4477.0 4624.5 4621.5 4779.0 4775. 5 4881.0 4877.0 5009.0 5006.0 5050.5 5047.0 5074.0 5071.0 MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 35.0 1940.0 Page 4 w219PB2013112010S5N.txt MWD 2 1940. 5 4417.0 $wD 3 4336.5 6960.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .11N Max frames per record undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service order Units Size Nsam Rep Code offset channel DEPT FT 4 1 68 0 1 CALA MWD IN 4 1 68 4 2 CALN MWD IN 4 1 68 8 3 FCNT MWD CP30 4 1 68 12 4 NCNT MWD CP30 4 1 68 16 5 RHO1 MWD G/CC 4 1 68 20 6 RHO3 MWD G/CC 4 1 68 24 7 RHO4 MWD G/CC 4 1 68 28 8 RHO2 MWD G/CC 4 1 68 32 9 PEF1 MWD B/E 4 1 68 36 10 PEF3 MWD B/E 4 1 68 40 11 PEF4 MWD B/E 4 1 68 44 12 PEF2 MWD B/E 4 1 68 48 13 DHO1 MWD G/CC 4 1 68 52 14 DHO3 MWD G/CC 4 1 68 56 15 DHO4 MWD G/CC 4 1 68 60 16 DH02 MWD G/CC 4 1 68 64 17 RHOB MWD G/CC 4 1 68 68 18 DRHO MWD G/CC 4 1 68 72 19 RPD MWD OHMM 4 1 68 76 20 RPM MWD OHMM 4 1 68 80 21 RPS MWD OHMM 4 1 68 84 22 RPX MWD OHMM 4 1 68 88 23 FET MWD HR 4 1 68 92 24 GR MWD API 4 1 68 96 25 PEF MWD B/E 4 1 68 100 26 ROP MWD FPH 4 1 68 104 27 NPHI MWD PU 4 1 68 108 28 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 36 6960 3498 13849 36 6960 CALA MWD IN 8.592 12.473 9.2859 4955 4390. 5 6872. 5 CALN MWD IN 8.19 14.09 8.91711 3362 4390.5 6882. 5 FCNT MWD CP30 449.56 1918.16 848.218 4958 4390.5 6869 NCNT MWD CP30 113044 180126 141673 4958 4390.5 6869 RHO1 MWD G/CC 0.229 3.051 2.23285 3459 4390.5 6882. 5 RHO3 MWD G/CC 1.274 2.905 2.19674 4727 4390.5 6882. 5 RHO4 MWD G/CC 1.264 2.997 2.20274 3400 4390.5 6882. 5 RHO2 MWD G/CC 1.304 2.894 2.16096 4177 4390.5 6882.5 PEF1 MWD B/E 0.335 15.628 2.35077 3499 4390.5 6882.5 Page 5 w219PB2013112010SSN.txt PEF3 MWD B/E 0.796 14.333 2.43958 4818 4390. 5 6882.5 PEF4 MWD B/E 0.813 14.655 2.4631 3429 4390.5 6882.5 PEF2 MWD B/E 0.97 13.923 2.55962 4199 4390.5 6882.5 DHO1 MWD G/CC -4.81 0.392 0.0299962 3459 4390.5 6882.5 DHO3 MWD G/CC -2.057 0.422 0.116747 4727 4390.5 6882.5 DH04 MWD G/CC -1.5 0.298 0.0985582 3400 4390.5 6882.5 DHO2 MWD G/CC -0.264 0.346 0.199618 4177 4390.5 6882.5 RHOB MWD G/CC 1.064 3.037 2.21965 4985 4390.5 6882.5 DRHO MWD G/CC -3.12 0.383 0.0929131 4985 4390.5 6882.5 RPD MWD OHMM 1.47 2000 9.84709 5038 4390.5 6909 RPM MWD OHMM 0.07 2000 7.35777 5038 4390.5 6909 RPS MWD OHMM 1.51 2000 7.19401 5038 4390. 5 6909 RPX MWD OHMM 1.38 1774.88 6.37204 5038 4390.5 6909 FET MWD HR 0.24 141.55 2.20628 5037 4390.5 6908.5 GR MWD API 11.55 137.12 67.8873 13763 36 6917 PEF MWD B/E 0.91 15.127 2.44357 4984 4391 6882.5 ROP MWD FPH 0.23 1340.16 215.576 13505 70 6960 NPHI MWD Pu 18.76 109.63 39.6544 4958 4390.5 6869 First Reading For Entire File 36 Last Reading For Entire File 6960 File Trailer Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Next File Name STSLIB.002 Physical EOF File Header Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SGRC 35.0 1940.0 SROP 69.0 1940.0 1 $ # LOG HEADER DATA DATE LOGGED: 02-NOV-10 SOFTWARE Page 6 w219PB2013112010ssN.txt SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 1940.0 TOP LOG INTERVAL (FT) : 70.0 BOTTOM LOG INTERVAL (FT) : 1940.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 2.0 MAXIMUM ANGLE: 53.4 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 10718512 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 12.250 DRILLER'S CASING DEPTH (FT) : 108.0 # BOREHOLE CONDITIONS MUD TYPE: Native/Spud Mud MUD DENSITY (LB/G) : 9.20 MUD VISCOSITY (S) : .0 MUD PH: 10.6 MUD CHLORIDES (PPM) : 400 FLUID LOSS (C3) : .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 95.5 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : # TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .11N Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD010 API 4 1 68 4 2 ROP MWD010 FPH 4 1 68 8 3 Page 7 W219PB201311201055N.txt First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 35 1940 987.5 3811 35 1940 GR MWD010 API 11.55 114.04 50.2589 3811 35 1940 ROP MWD010 FPH 12.48 600.57 174.369 3743 69 1940 First Reading For Entire File 35 Last Reading For Entire File 1940 File Trailer Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Next File Name STSLIB.003 Physical EOF File Header Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SGRC 1940. 5 4360.0 SROP 2074.0 4417.0 LOG HEADER DATA DATE LOGGED: 06-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 4417.0 TOP LOG INTERVAL (FT) : 1940.0 BOTTOM LOG INTERVAL (FT) : 4417.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 32.8 MAXIMUM ANGLE: 55.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER Page 8 w219PB2o13112010ssN.txt DGR Dual Gamma Ray 163685 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 12.250 DRILLER'S CASING DEPTH (FT) : 108.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 9.40 MUD VISCOSITY (S) : 45.0 MUD PH: 10.8 MUD CHLORIDES (PPM) : 400 FLUID LOSS (C3) : 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 2.200 70.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.770 88.5 MUD FILTRATE AT MT: 2.390 70.0 MUD CAKE AT MT: 2.000 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down optical log depth units Feet Data Reference Point undefined Frame Spacing 60 .11N Max frames per record undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD020 API 4 1 68 4 2 ROP MWD020 FPH 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 1940.5 4417 3178.75 4954 1940.5 4417 GR MWD020 API 23.9 127.88 78.3658 4840 1940.5 4360 ROP MWD020 FPH 35.69 987.4 272.982 4687 2074 4417 First Reading For Entire File 1940.5 Last Reading For Entire File 4417 File Trailer Service name STSLIB.003 Page 9 W219PB201311201055N.txt Service Sub Level Name version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Next File Name STSLIB.004 Physical EOF File Header Service name STSLIB.004 Service Sub Level Name version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SNP2 4336.5 6879.5 SGRC 4360.5 6914.0 SFXE 4363.0 6905.5 SBD2 4396.0 6879.5 HDLQ 4396.0 6879.5 CTNA 4396.0 6866.0 CTFA 4396.0 6866.0 HDRQ 4396.0 6879.5 TNPS 4396.0 6866.0 HDTQ 4396.0 6879.5 AHSI 4396.0 6879.5 HDBQ 4396.0 6879.5 HRLQ 4396.0 6879.5 SEDP 4396.0 6906.0 HPBQ 4396.0 6879.5 SCO2 4396.0 6879.5 SEXP 4396.0 6906.0 HRTQ 4396.0 6879.5 HPLQ 4396.0 6879.5 ACAL 4396.0 6869.5 HRBQ 4396.0 6879.5 HPTQ 4396.0 6879.5 SEMP 4396.0 6906.0 HPRQ 4396.0 6879. 5 HRRQ 4396.0 6879.5 SESP 4396.0 6906.0 SROP 4418.5 6960.0 LOG HEADER DATA DATE LOGGED: 13-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite Page 10 w219PB2o1311201055N.txt DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 6960.0 TOP LOG INTERVAL (FT) : 4417.0 BOTTOM LOG INTERVAL (FT) : 6960.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 33.5 MAXIMUM ANGLE: 54.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 11321777 EWR4 EWR Phase-4 231951 CTN Comp Thermal Neutron 244601 ALD Azimuthal Litho Dens 1205035 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 8.750 DRILLER'S CASING DEPTH (FT) : 4406.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 9.40 MUD VISCOSITY (5) : 50.0 MUD PH: 10.8 MUD CHLORIDES (PPM) : 400 FLUID LOSS (C3) : 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 2.200 70.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.410 113.2 MUD FILTRATE AT MT: 2.390 70.0 MUD CAKE AT MT: 2.000 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .11N Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service order units size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 CALA MWD030 IN 4 1 68 4 2 CALN MWD030 IN 4 1 68 8 3 FCNT MWD030 CP30 4 1 68 12 4 Page 11 w219PB20131120105sN.txt NCNT MWD030 CP30 4 1 68 16 5 RH01 MWD030 G/CC 4 1 68 20 6 RHOS MWD030 G/CC 4 1 68 24 7 RH04 MWD030 G/CC 4 1 68 28 8 RH02 MWD030 G/CC 4 1 68 32 9 PEF1 MWD030 B/E 4 1 68 36 10 PEF3 MWD030 B/E 4 1 68 40 11 PEF4 MWD030 B/E 4 1 68 44 12 PEF2 MWD030 B/E 4 1 68 48 13 DHO1 MWD030 G/CC 4 1 68 52 14 DHO3 MWD030 G/CC 4 1 68 56 15 DHO4 MWD030 G/CC 4 1 68 60 16 DH02 MWD030 G/CC 4 1 68 64 17 RHOB MWD030 G/CC 4 1 68 68 18 DRHO MWD030 G/CC 4 1 68 72 19 RPD MWD030 OHMM 4 1 68 76 20 RPM MWD030 OHMM 4 1 68 80 21 RPS MWD030 OHMM 4 1 68 84 22 RPX MWD030 OHMM 4 1 68 88 23 FET MWD030 HR 4 1 68 92 24 GR MWD030 API 4 1 68 96 25 PEF MWD030 B/E 4 1 68 100 26 NPHI MWD030 PU 4 1 68 104 27 ROP MWD030 FPH 4 1 68 108 28 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4336.5 6960 5648.25 5248 4336.5 6960 CALA MWD030 IN 8. 592 12.473 9.28512 4938 4396 6869.5 CALN MWD030 IN 8.19 14.09 8.91568 3348 4396 6879. 5 FCNT MWD030 CP30 449. 56 1918.16 848.625 4941 4396 6866 NCNT MWD030 CP30 113044 180126 141697 4941 4396 6866 RHO1 MWD030 G/CC 0.229 3.051 2.23371 3445 4396 6879.5 RH03 MWD030 G/CC 1.274 2.905 2.19722 4713 4396 6879. 5 RHO4 MWD030 G/CC 1.264 2.997 2.20358 3386 4396 6879.5 RH02 MWD030 G/CC 1.304 2.894 2.16162 4159 4396 6879.5 PEF1 MWD030 B/E 0.335 15.628 2.34727 3485 4396 6879.5 PEF3 MWD030 B/E 0.796 14.333 2.43599 4804 4396 6879.5 PEF4 MWD030 B/E 0.813 14.655 2.4583 3415 4396 6879.5 PEF2 MWD030 B/E 0.97 13.923 2.553 4181 4396 6879.5 DHO1 MWD030 G/CC -4.81 0.392 0.0309858 3445 4396 6879.5 DHO3 MWD030 G/CC -2.057 0.422 0.117104 4713 4396 6879.5 DHO4 MWD030 G/CC -1.5 0.298 0.0990594 3386 4396 6879.5 DHO2 MWD030 G/CC -0.264 0.346 0.199805 4159 4396 6879.5 RHOB MWD030 G/CC 1.064 3.037 2.22005 4968 4396 6879.5 DRHO MWD030 G/CC -3.12 0.383 0.0932285 4968 4396 6879.5 RPD MWD030 OHMM 1.47 2000 9.43876 5021 4396 6906 RPM MWD030 OHMM 0.07 2000 7.33054 5021 4396 6906 RPS MWD030 OHMM 1.51 2000 7.17309 5021 4396 6906 RPX MWD030 OHMM 1.38 1774.88 6.35424 5021 4396 6906 FET MWD030 HR 0.24 141.55 3.85128 5086 4363 6905.5 GR MWD030 API 13.33 137.12 71.0399 5108 4360.5 6914 PEF MWD030 B/E 0.91 14.98 2.63905 5087 4336.5 6879.5 NPHI MWD030 PU 18.76 109.63 39.6262 4941 4396 6866 ROP MWD030 FPH 0.23 1340.16 193.29 5082 4418.5 6960 First Reading For Entire File 4336.5 Last Reading For Entire File 6960 Page 12 W219PB2013112010SSN.txt File Trailer Service name STSLIB.004 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/01/19 Maximum Physical Record65535 File Type LO Next File Name STSLIB.005 Physical EOF Tape Trailer Service name LISTPE Date 11/01/19 Origin STS Tape Name UNKNOWN Continuation Number 01 Next Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name LISTPE Date 11/01/19 Origin STS Reel Name UNKNOWN Continuation Number 01 Next Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File Page 13